{"meta":{"query_hash":"884bc0837e4c","filters":{"topic":"BIM and Construction Integration"},"cohort_total":1860,"direct_labels_cover":5,"predictions_cover":1860,"exported":1860,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/884bc0837e4c","api":"https://metacan.xera.ac/api/v1/cohort?topic=BIM+and+Construction+Integration"},"results":[{"id":"W101405778","doi":"10.1061/41020(339)52","title":"Querying IFC-Based Building Information Models to Support Construction Management Functions","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Computer science; Information model; Ontology; Feature (linguistics); Product (mathematics); Software engineering; Domain (mathematical analysis); Systems engineering; Function (biology); Engineering","score_opus":0.03556985509435197,"score_gpt":0.29645613727687814,"score_spread":0.2608862821825262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W101405778","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082780145,0.00013360557,0.78863174,0.0011219486,0.0056429673,0.0017525526,0.00010605736,0.001823071,0.118007906],"genre_scores_gemma":[0.95767874,0.00012716398,0.040797863,0.00027816888,0.00026984478,0.00022498789,0.00011982568,0.000033910703,0.00046948725],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972656,0.00011528713,0.0006694237,0.0003598616,0.00089888606,0.00069097],"domain_scores_gemma":[0.9982396,0.00006210923,0.0000836509,0.00046531082,0.00082255807,0.00032680057],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00054829556,0.0002957943,0.00025819466,0.0017211451,0.0005873442,0.00045909078,0.0002644569,0.00021949394,0.0003941468],"category_scores_gemma":[0.000046677524,0.00032962125,0.000111705456,0.0014786489,0.00025005278,0.0018508087,0.000035819834,0.00061586004,0.00033969688],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007617605,0.000021456324,0.00016019409,0.000064509935,0.00005166201,0.0000063145903,0.000099866025,0.08191107,0.0015454419,0.111079216,0.013326566,0.7916575],"study_design_scores_gemma":[0.005582437,0.0011811865,0.0031075194,0.0008762325,0.00018309685,0.0008481756,0.00974501,0.515536,0.039751984,0.06997144,0.35044917,0.0027677324],"about_ca_topic_score_codex":0.000021343032,"about_ca_topic_score_gemma":0.000014688472,"teacher_disagreement_score":0.8748986,"about_ca_system_score_codex":0.00044085563,"about_ca_system_score_gemma":0.0001251246,"threshold_uncertainty_score":0.9999156},"labels":[],"label_agreement":null},{"id":"W1042486207","doi":"10.1016/j.autcon.2015.07.002","title":"Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Productivity; Prefabrication; Process (computing); Action research; Engineering; Business; Process management; Industrial organization; Operations management; Computer science; Economics; Civil engineering; Management; Economic growth","score_opus":0.10529566150774342,"score_gpt":0.341895599603656,"score_spread":0.2365999380959126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1042486207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9933693,0.00005779911,0.0018527233,0.00018345726,0.0010495211,0.0004200963,0.000007031692,0.00013342871,0.0029266856],"genre_scores_gemma":[0.9989658,0.000023689912,0.00070110045,0.0000032020257,0.00021002702,0.00006657346,0.0000053339922,0.000015136363,0.000009156827],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9985622,0.0002783348,0.00044608323,0.00019938368,0.000289771,0.00022419191],"domain_scores_gemma":[0.99913,0.00019572559,0.00012073671,0.00023022472,0.0002859742,0.000037350226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009954182,0.00013792483,0.00018308221,0.00039823737,0.0000745573,0.000055190827,0.000103951854,0.000113754715,0.00002869216],"category_scores_gemma":[0.00045885734,0.000112585425,0.000056839945,0.0009641594,0.00013016576,0.00055800186,0.000014096223,0.00049651053,0.00001576236],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040572355,0.0002792783,0.3172991,0.00015084284,0.00012273717,0.000005129579,0.009222324,0.24575156,0.015096668,0.025275717,0.0005568333,0.38583407],"study_design_scores_gemma":[0.003353961,0.00029692298,0.69524664,0.0006067033,0.000020756679,0.00018893534,0.012206987,0.18672673,0.06681846,0.033296984,0.0006548632,0.0005820511],"about_ca_topic_score_codex":0.0012569936,"about_ca_topic_score_gemma":0.0015478134,"teacher_disagreement_score":0.38525203,"about_ca_system_score_codex":0.0007167095,"about_ca_system_score_gemma":0.00015755175,"threshold_uncertainty_score":0.45911005},"labels":[],"label_agreement":null},{"id":"W1140057221","doi":"10.1520/stp157420130107","title":"An Investigation on Bio-Based Polyurethane Foam Insulation for Building Construction","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Polyurethane; Foam concrete; Composite material; Materials science; Architectural engineering; Engineering","score_opus":0.018035329845711847,"score_gpt":0.2153833212308707,"score_spread":0.19734799138515885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1140057221","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006988312,0.000070986884,0.8735927,0.00016683375,0.002974797,0.0009056173,0.000079849306,0.0014137407,0.11380719],"genre_scores_gemma":[0.9074675,0.000027616481,0.065292686,0.0005429195,0.0022015132,0.00014760517,0.0019630739,0.00031526483,0.022041846],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999003,0.000011963859,0.00036234834,0.0002924225,0.00018553897,0.00014473745],"domain_scores_gemma":[0.9993116,0.000059330272,0.00012924569,0.00026362558,0.00014295065,0.000093216746],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001151334,0.00031413249,0.00023267824,0.00037881103,0.0000944092,0.000070406815,0.000077555706,0.00054866937,0.00017019697],"category_scores_gemma":[0.000011973169,0.0003241233,0.00010538088,0.00003991339,0.00008177792,0.00013463454,0.0000026825494,0.00022836434,0.000028297585],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027465196,0.00000218183,0.000029347495,0.00008237985,0.000029726583,1.1449903e-7,0.000014890148,0.007142037,0.006646567,0.8631516,0.0003409581,0.12253272],"study_design_scores_gemma":[0.0017146736,0.00069175055,0.00019590676,0.00064473646,0.00021895969,0.000025245323,0.000031316133,0.6356178,0.08041772,0.19082534,0.088010505,0.0016060569],"about_ca_topic_score_codex":0.0000075916637,"about_ca_topic_score_gemma":0.000016059907,"teacher_disagreement_score":0.90047914,"about_ca_system_score_codex":0.00015554258,"about_ca_system_score_gemma":0.00004294522,"threshold_uncertainty_score":0.9999211},"labels":[],"label_agreement":null},{"id":"W1169558121","doi":"10.1017/cbo9780511614958.011","title":"Principles of virtual work","year":2002,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Work (physics); Computer science; Engineering; Mechanical engineering","score_opus":0.01184346950635905,"score_gpt":0.18245499296998563,"score_spread":0.17061152346362657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1169558121","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000013513733,0.00032786504,0.0061158333,0.00000264603,0.00046187307,0.00003285978,0.0000044499925,0.0003258939,0.99271506],"genre_scores_gemma":[0.0020376174,0.00010965257,0.00108514,0.0000029337853,0.0001220811,0.0000035467012,0.0000037343852,0.00009742248,0.99653786],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99978626,0.0000020605823,0.00008097047,0.000042957206,0.00004747759,0.000040252275],"domain_scores_gemma":[0.9998763,0.0000031083327,0.000017891345,0.00008642519,0.0000049433966,0.00001131248],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000066377543,0.00006591721,0.00008046941,0.00007076144,0.000002473089,0.0000031969093,0.00003709104,0.00012036331,0.018950632],"category_scores_gemma":[0.0000013947396,0.000056276385,0.000025752286,0.000054780805,0.0000148744,0.0000073501096,0.0000031803684,0.000052152976,0.00018553741],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.906993e-7,0.000004117627,0.000063522464,0.00003281848,0.000041829786,2.552561e-7,0.00001867572,0.00041280026,0.000019155095,0.05134965,0.88417554,0.063881114],"study_design_scores_gemma":[0.000030881678,0.000003452954,0.000016856096,0.000054321787,0.000004535355,6.838026e-7,0.000009922632,0.00037015855,0.00016931276,0.000005448338,0.99927,0.00006442247],"about_ca_topic_score_codex":0.0000072768357,"about_ca_topic_score_gemma":0.000018643006,"teacher_disagreement_score":0.11509444,"about_ca_system_score_codex":0.0000062323325,"about_ca_system_score_gemma":0.0000018906518,"threshold_uncertainty_score":0.9819462},"labels":[],"label_agreement":null},{"id":"W120103527","doi":"10.22260/isarc2013/0136","title":"Development of BIM based rehabilitation and maintenance process for roads","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Building information modeling; Computer science; Automation; Work (physics); Download; Control (management); Systems engineering; Construction engineering; Manufacturing engineering; Engineering; Artificial intelligence; Mechanical engineering; Operations management; World Wide Web; Operating system","score_opus":0.008186448416831249,"score_gpt":0.2073115852023902,"score_spread":0.19912513678555896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W120103527","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957474,0.00002634431,0.002268619,0.00029237056,0.00007934744,0.00035802746,0.0000018625271,0.000032809046,0.0011932605],"genre_scores_gemma":[0.9679658,0.0000011615325,0.03183251,0.000010702022,0.000011390379,0.00013977029,4.6666372e-7,0.000007939303,0.00003026972],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995852,7.36381e-7,0.00018637537,0.00007032318,0.00008329705,0.00007405126],"domain_scores_gemma":[0.9995634,0.000023941864,0.00006435336,0.000030133167,0.00030258074,0.000015571744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009689026,0.000059462294,0.00008117742,0.000040307234,0.000032628905,0.000010312261,0.000075255346,0.000033192664,0.00000901812],"category_scores_gemma":[0.00008309224,0.000042458374,0.000024773955,0.00009930316,0.000052397783,0.00013817927,0.000007736444,0.00003499724,6.513127e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085498395,0.00008771064,0.033682596,0.0062323795,0.00009029041,6.114987e-9,0.009938605,0.0005632741,0.69067526,0.06765814,0.0046334607,0.18635274],"study_design_scores_gemma":[0.00094602763,0.00010142266,0.041895874,0.00054807606,0.000028139131,0.0000028848838,0.005612598,0.06549357,0.8484063,0.033416606,0.0032753483,0.00027316142],"about_ca_topic_score_codex":0.0000024641936,"about_ca_topic_score_gemma":0.0000014278631,"teacher_disagreement_score":0.18607959,"about_ca_system_score_codex":0.00001938839,"about_ca_system_score_gemma":0.000016063874,"threshold_uncertainty_score":0.17314023},"labels":[],"label_agreement":null},{"id":"W129345492","doi":"10.1007/978-1-4020-2393-4_3","title":"Computer-Aided Conceptual Design of Building Structures","year":2004,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec; Concordia University","funders":"","keywords":"Conceptual design; Representation (politics); Context (archaeology); Systems engineering; Software engineering; Computer science; Architecture; Architectural design; Architectural technology; Computer Aided Design; Software; Engineering; Engineering drawing; Programming language; Human–computer interaction","score_opus":0.020020217036004092,"score_gpt":0.20469796495609105,"score_spread":0.18467774792008695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W129345492","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000069146605,0.00031811092,0.80394953,0.0000041526487,0.0008511764,0.0001439597,0.00001300181,0.00025542374,0.19439551],"genre_scores_gemma":[0.5688811,0.00035201295,0.3573513,0.00012248487,0.0015744506,0.0000146122675,0.00008021465,0.00026819418,0.07135565],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993585,0.000004063845,0.00027899403,0.00013340334,0.00013080229,0.00009424158],"domain_scores_gemma":[0.99967664,0.000029038296,0.00006028657,0.00013960432,0.000059755956,0.000034673973],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000025655572,0.0002119954,0.00025147063,0.00010785887,0.000020370793,0.000015335803,0.00009633881,0.00026934015,0.0015841535],"category_scores_gemma":[0.0000014777869,0.00019710796,0.0000801981,0.000014872405,0.00010754615,0.00005040353,0.000012212655,0.0002022573,0.00001202426],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026561293,6.3783716e-7,4.2967562e-7,0.000027243406,0.00006596983,0.0000013152946,0.000048906815,0.05784207,0.0007649673,0.92508245,0.0007314991,0.015431852],"study_design_scores_gemma":[0.0014604363,0.00031125103,0.000033094802,0.0008313696,0.00022017941,0.00013305746,0.00010419665,0.049484856,0.041894276,0.86455196,0.03917271,0.0018026158],"about_ca_topic_score_codex":0.0000076571405,"about_ca_topic_score_gemma":0.0000018685666,"teacher_disagreement_score":0.56881195,"about_ca_system_score_codex":0.000066521,"about_ca_system_score_gemma":0.000037357517,"threshold_uncertainty_score":0.99932855},"labels":[],"label_agreement":null},{"id":"W133259137","doi":"10.5957/jsp.2008.24.1.1","title":"A Linear Programming Approach to Optimization of Ship Design and Construction Phases","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Shipbuilding; Schedule; Engineering; Duration (music); Linear programming; Operations research; Construction management; Design–build; Naval architecture; Computer science; Mathematical optimization; Civil engineering; Mathematics; Marine engineering","score_opus":0.03528924747972239,"score_gpt":0.23038810141038774,"score_spread":0.19509885393066534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W133259137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22185117,0.00027087057,0.7764505,0.00009167321,0.0009278121,0.00021991019,5.3611996e-7,0.000047159017,0.00014034235],"genre_scores_gemma":[0.6274057,0.00014963667,0.37201178,0.0000040072064,0.00038440857,0.000006465339,0.0000016616009,0.000011616257,0.000024729408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991584,0.000043636755,0.00040716308,0.00010802357,0.00018693099,0.00009586509],"domain_scores_gemma":[0.9993633,0.000012772386,0.00017468412,0.00007826315,0.00030872706,0.00006224066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031351796,0.0000999039,0.00016818188,0.00027015782,0.000071799586,0.00001628049,0.000045212466,0.0000686388,0.0000064793194],"category_scores_gemma":[0.0001164232,0.000091612004,0.000041193336,0.00032441225,0.00007607222,0.0004163933,0.000004487327,0.0001558222,5.215184e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018019268,0.000093683266,0.0012041962,0.00011641273,0.000071700146,0.0000015414226,0.0013535187,0.8984179,0.011698709,0.00037366673,0.0005754937,0.08591297],"study_design_scores_gemma":[0.0034627072,0.0024253272,0.004420627,0.00081540056,0.0005129637,0.024143122,0.005719957,0.42907968,0.5203152,0.0015393042,0.0062319264,0.0013338019],"about_ca_topic_score_codex":0.0000020377215,"about_ca_topic_score_gemma":2.2576836e-7,"teacher_disagreement_score":0.50861645,"about_ca_system_score_codex":0.000049204038,"about_ca_system_score_gemma":0.000036171168,"threshold_uncertainty_score":0.37358293},"labels":[],"label_agreement":null},{"id":"W135582993","doi":"","title":"Editorial - Use of Gaming Technology in Architecture, Engineering and Construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Architecture; Engineering; Multimedia; Visualization; Engineering management; Computer science","score_opus":0.0031696174758520644,"score_gpt":0.1802410623213675,"score_spread":0.17707144484551543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W135582993","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032084387,0.00031045082,0.018140791,0.000055153185,0.94889843,0.00023070352,0.000037959508,0.00017438103,0.00006773545],"genre_scores_gemma":[0.10236762,0.00593401,0.18031193,0.000007950082,0.71103597,0.0000749764,0.00012226797,0.000138013,0.00000726441],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974527,0.00002416194,0.0017840614,0.00012737201,0.00037065547,0.00024108384],"domain_scores_gemma":[0.9979411,0.00015261669,0.0010522106,0.00019813953,0.00061637524,0.00003960589],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0003370291,0.00030853244,0.00065246015,0.007478985,0.000029822006,0.000046171866,0.0002117087,0.0024640886,0.000008769424],"category_scores_gemma":[0.0010611474,0.0003261284,0.000075899625,0.0012197405,0.00037904852,0.0014411076,0.00004531391,0.0024801462,0.0000015401724],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047460076,0.000059831258,0.0070564277,0.0013284119,0.00041262896,0.000016191345,0.0010062086,0.014110174,0.0042465148,0.036494374,0.12749158,0.8073031],"study_design_scores_gemma":[0.006824582,0.0008514892,0.00037662935,0.00433947,0.00025239974,0.003382982,0.0036096484,0.006264548,0.032739557,0.055524584,0.88415504,0.0016790609],"about_ca_topic_score_codex":0.000022542177,"about_ca_topic_score_gemma":0.00001899204,"teacher_disagreement_score":0.805624,"about_ca_system_score_codex":0.00030374847,"about_ca_system_score_gemma":0.00019168535,"threshold_uncertainty_score":0.99991906},"labels":[],"label_agreement":null},{"id":"W138138192","doi":"10.22260/isarc2013/0014","title":"Improving Construction Environmental Metrics through Integration of Discrete Event Simulation and Life Cycle Analysis","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Event (particle physics); Computer science; Environmental science; Econometrics; Risk analysis (engineering); Mathematics; Business","score_opus":0.007024748712267992,"score_gpt":0.206692774224128,"score_spread":0.19966802551186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W138138192","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9736683,0.00010359437,0.025174921,0.000045481032,0.00010065248,0.00018543041,0.000008116597,0.000032966025,0.0006805461],"genre_scores_gemma":[0.9965912,0.00002846074,0.0033052724,0.0000072077837,0.000028464936,0.00001219122,0.000003595603,0.000008855803,0.000014716975],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993408,0.0000041188055,0.00029110754,0.00010931014,0.00017338317,0.00008129566],"domain_scores_gemma":[0.999649,0.000024382547,0.00017420118,0.000059577644,0.00006655278,0.00002630503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007257147,0.00009589288,0.00014888222,0.00013177544,0.000052026364,0.000030338473,0.00007362464,0.000062998835,0.00004985667],"category_scores_gemma":[0.00005752354,0.00007294471,0.00008691328,0.0004164501,0.000099455545,0.00050947245,0.000029646319,0.00008831285,0.0000013095358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003169544,0.00005243833,0.09787591,0.0003221653,0.0007462599,2.0576419e-8,0.0033215785,0.106612876,0.60591763,0.013218595,0.000089756584,0.17181107],"study_design_scores_gemma":[0.00017529888,0.000026077607,0.033915304,0.000026672918,0.00024682807,0.0000017810966,0.0024455078,0.89244837,0.06762771,0.0029513917,0.000021666418,0.000113417096],"about_ca_topic_score_codex":0.000085750224,"about_ca_topic_score_gemma":0.0000026866603,"teacher_disagreement_score":0.78583544,"about_ca_system_score_codex":0.00004517434,"about_ca_system_score_gemma":0.000004169061,"threshold_uncertainty_score":0.2974599},"labels":[],"label_agreement":null},{"id":"W138377706","doi":"10.1007/1-4020-4891-2_67","title":"Better Visualization for Multiple-Site Infrastructure Programs Using GIS","year":2007,"lang":"en","type":"book-chapter","venue":"Solid mechanics and its applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Geographic information system; Visualization; Schedule; Information system; Work (physics); Database; Engineering; Data mining; Geography; Operating system; Operations management; Cartography","score_opus":0.022485074935429634,"score_gpt":0.26277555291886506,"score_spread":0.24029047798343542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W138377706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016043414,0.0006949888,0.98926234,0.000015773345,0.0002830923,0.0014950305,0.00023981572,0.00024335923,0.007605147],"genre_scores_gemma":[0.54545516,0.01200442,0.26814944,0.00259341,0.015694892,0.008794126,0.026673982,0.0036614838,0.11697313],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991012,0.0000022117156,0.00032281844,0.00027010308,0.000120222896,0.00018340013],"domain_scores_gemma":[0.99939233,0.000022669312,0.00011279449,0.0001856827,0.00020604212,0.00008049645],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006282397,0.00026698335,0.00021182605,0.00015488855,0.00016908172,0.000068281974,0.00007595783,0.00044913084,0.000048680373],"category_scores_gemma":[0.0000042344786,0.0002819537,0.000083181534,0.00006155909,0.000012624575,0.000084170635,0.000020937834,0.00019368638,0.000010890503],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041431576,0.0000055346413,0.0000018542916,0.00015987585,0.000067996094,1.40503e-7,0.00006727191,0.0004036014,0.00283565,0.8790395,0.00022188414,0.117192514],"study_design_scores_gemma":[0.00021908797,0.000026512333,0.0000014147793,0.00008000035,0.00012646701,0.000015861684,0.000018185798,0.44137007,0.0008640587,0.06722797,0.48967296,0.0003774201],"about_ca_topic_score_codex":0.0000013058138,"about_ca_topic_score_gemma":0.000019983674,"teacher_disagreement_score":0.81181157,"about_ca_system_score_codex":0.00007133468,"about_ca_system_score_gemma":0.00002282442,"threshold_uncertainty_score":0.9999633},"labels":[],"label_agreement":null},{"id":"W1456821793","doi":"10.22260/isarc2013/0163","title":"Risk Identification Expert System for Metro Construction Based on BIM","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Identification (biology); Knowledge base; Expert system; Tacit knowledge; Domain (mathematical analysis); Computer science; Risk analysis (engineering); Engineering; Building information modeling; Risk management; Knowledge extraction; Bridge (graph theory); Knowledge management; Data mining; Artificial intelligence; Operations management","score_opus":0.007213105801386763,"score_gpt":0.19407494790739896,"score_spread":0.1868618421060122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1456821793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.959094,0.000094136616,0.025895197,0.00043635565,0.0026172264,0.0012711992,0.000034958473,0.0005080481,0.010048871],"genre_scores_gemma":[0.9957922,0.0000056545155,0.003750322,0.000015963105,0.0001172779,0.00025068945,0.0000020618152,0.000018038045,0.000047767462],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99936306,0.00000382372,0.00024413345,0.00012519129,0.00015459623,0.000109197],"domain_scores_gemma":[0.99943596,0.00003135202,0.0001395708,0.000092474074,0.00027422453,0.000026434374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013272984,0.000101018086,0.00010773434,0.00010177526,0.00010088132,0.00006340196,0.00014470426,0.00007030492,0.000021779628],"category_scores_gemma":[0.00006271496,0.000075219665,0.00008994274,0.00017775562,0.000050371887,0.00020712543,0.0000074347204,0.000086104425,0.0000180703],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009616855,0.000070053364,0.01811015,0.0012655309,0.00018021835,2.2583334e-8,0.0006547409,0.003231614,0.6558988,0.14380981,0.021480272,0.15520258],"study_design_scores_gemma":[0.00053269265,0.00005139461,0.0048105,0.00017525381,0.0000535786,0.0000054272114,0.0031548801,0.27697977,0.70920557,0.0034628573,0.0013616374,0.00020647504],"about_ca_topic_score_codex":0.00002923466,"about_ca_topic_score_gemma":9.037753e-7,"teacher_disagreement_score":0.27374816,"about_ca_system_score_codex":0.00009342632,"about_ca_system_score_gemma":0.0000070602287,"threshold_uncertainty_score":0.3067369},"labels":[],"label_agreement":null},{"id":"W1496952816","doi":"10.25916/sut.26223833","title":"Cyclic Functional Collaboration: A scientific approach to housing","year":2012,"lang":"en","type":"article","venue":"Swinburne Research Bank (Swinburne University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Computer science; Public relations; Political science","score_opus":0.0330381216406927,"score_gpt":0.25111032453493026,"score_spread":0.21807220289423757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1496952816","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9167609,0.0012113962,0.03246045,0.001218393,0.0009443619,0.000629729,0.000028330474,0.0008922796,0.045854148],"genre_scores_gemma":[0.9901501,0.000040192586,0.007894258,0.000006765819,0.00012891916,0.0000047296394,0.000022673317,0.000020939233,0.0017314575],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99811935,0.000056476867,0.00020654009,0.0003263035,0.0006385135,0.0006528016],"domain_scores_gemma":[0.998523,0.00004004213,0.00004174519,0.00049508986,0.00068722956,0.00021292164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087230024,0.00016736607,0.00023016933,0.002368095,0.00060724193,0.000070699534,0.00043928504,0.0003139077,0.00032674422],"category_scores_gemma":[0.00011497861,0.00019628317,0.00007813268,0.0049078017,0.00072050816,0.0005991844,0.00018011204,0.0006128026,0.00015970375],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003475773,0.0011442584,0.038309928,0.00037551523,0.00063929596,0.000021845824,0.0050699683,0.009750849,0.31177914,0.21569459,0.25715798,0.15970905],"study_design_scores_gemma":[0.002553433,0.00033597782,0.014158111,0.00024180494,0.000109907916,0.000118696415,0.038884725,0.008300897,0.0934484,0.005502473,0.8350993,0.0012463185],"about_ca_topic_score_codex":0.000029613739,"about_ca_topic_score_gemma":0.000038252514,"teacher_disagreement_score":0.57794124,"about_ca_system_score_codex":0.00036476046,"about_ca_system_score_gemma":0.00015484067,"threshold_uncertainty_score":0.80041957},"labels":[],"label_agreement":null},{"id":"W1500035233","doi":"10.1108/ci-01-2014-0013","title":"Embedded contexts of innovation","year":2015,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Originality; Leverage (statistics); Process (computing); Business; Innovation process; Process management; Knowledge management; Bridge (graph theory); Perspective (graphical); Marketing; Computer science; Work in process; Qualitative research; Sociology","score_opus":0.02258167117858278,"score_gpt":0.2423899414925268,"score_spread":0.219808270313944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1500035233","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.798555,0.00006306567,0.17095,0.000069107715,0.0029539664,0.00017642726,0.000011316348,0.0003975042,0.02682358],"genre_scores_gemma":[0.993763,0.0000044182943,0.005818653,0.00003853921,0.00014621438,0.000020917785,0.0000930543,0.000015868123,0.00009931579],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998837,0.000018684816,0.0007158431,0.00011728472,0.0002043095,0.00010687433],"domain_scores_gemma":[0.99793977,0.0000122174715,0.00019313725,0.00015668929,0.0016752554,0.000022919441],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024085988,0.000116921045,0.00014433183,0.00070227124,0.00003480269,0.000023599743,0.000060858853,0.00012348483,0.00007648005],"category_scores_gemma":[0.00015580084,0.00012680833,0.000016846196,0.0031480307,0.00011659151,0.0004029809,0.000007839083,0.00012666624,0.000026664922],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022099017,0.000010442176,0.00304376,0.000031174262,0.000030370975,2.3503509e-7,0.0002207933,0.0011266599,0.043997187,0.73546386,0.004253281,0.21180013],"study_design_scores_gemma":[0.0049578683,0.00026522425,0.008424296,0.00018960022,0.000070344606,0.0003579535,0.004947643,0.033840016,0.72470784,0.15681857,0.06425102,0.0011696201],"about_ca_topic_score_codex":0.0000040087752,"about_ca_topic_score_gemma":0.0000018794595,"teacher_disagreement_score":0.6807107,"about_ca_system_score_codex":0.000089090594,"about_ca_system_score_gemma":0.00008630666,"threshold_uncertainty_score":0.51710933},"labels":[],"label_agreement":null},{"id":"W1506789237","doi":"10.1111/j.1467-8667.2010.00650.x","title":"Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction","year":2010,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; U.S. Department of Defense","keywords":"Computer science; System dynamics; Context (archaeology); Hybrid system; Architecture; Event (particle physics); Discrete event simulation; Systems engineering; Complex system; Distributed computing; Systems modeling; Industrial engineering; Simulation; Artificial intelligence; Engineering; Software engineering; Machine learning","score_opus":0.0024028536407555423,"score_gpt":0.18188607908299811,"score_spread":0.17948322544224257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1506789237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4052852,0.000117238975,0.59367526,0.0000069793114,0.0006368684,0.00013444427,0.000020606292,0.00011117972,0.000012227402],"genre_scores_gemma":[0.8919475,0.000020507898,0.10772377,0.0000040772816,0.00024920667,0.000011890212,0.000017106082,0.000025299405,6.588602e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926376,0.0000063700827,0.0002922689,0.00020159197,0.00008012727,0.00015585532],"domain_scores_gemma":[0.9996064,0.00008648737,0.00004532791,0.00012329173,0.00005694953,0.00008159781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000066496395,0.00020946644,0.0002342073,0.00013442732,0.00007205219,0.000059223712,0.000049110917,0.00013001877,0.0000022403844],"category_scores_gemma":[0.000021087119,0.0002007103,0.000034647845,0.00007366517,0.000048417995,0.00014231546,0.000029839714,0.00032502555,4.783798e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008639777,8.1290295e-7,0.0001249225,0.0004350146,0.000028645847,2.9829638e-7,0.00011116609,0.8983681,0.0022869406,0.018723745,0.0000017596775,0.07990993],"study_design_scores_gemma":[0.00031782206,0.00003576385,0.0005223913,0.00016495342,0.000028322978,0.00015807028,0.000053616746,0.99542665,0.00067344203,0.0023532046,0.00007441452,0.00019137202],"about_ca_topic_score_codex":0.000002786187,"about_ca_topic_score_gemma":0.0000067764604,"teacher_disagreement_score":0.4866623,"about_ca_system_score_codex":0.000024950905,"about_ca_system_score_gemma":0.000007371602,"threshold_uncertainty_score":0.81847286},"labels":[],"label_agreement":null},{"id":"W1508591347","doi":"","title":"Seismic retrofitting of deficient Canadian buildings","year":2009,"lang":"en","type":"dissertation","venue":"DSpace@MIT (Massachusetts Institute of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Retrofitting; Architectural engineering; Seismic retrofit; Engineering; Forensic engineering; Civil engineering; Construction engineering; Structural engineering; Reinforced concrete","score_opus":0.005632949883183466,"score_gpt":0.20796672194628918,"score_spread":0.2023337720631057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1508591347","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.956517,0.0029405172,0.0011028136,0.0006007533,0.0030211,0.00050233584,0.00019799183,0.00082692667,0.034290586],"genre_scores_gemma":[0.9929373,0.0002580345,0.005451407,0.000021821497,0.00005955391,0.000032032538,0.00030681278,0.00006296946,0.00087003387],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99805063,0.0000091822585,0.0007587979,0.0003907745,0.0003159491,0.00047464645],"domain_scores_gemma":[0.998591,0.000009026361,0.00038776756,0.0005881598,0.00030897913,0.000115089184],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00012450811,0.00045356416,0.0006700985,0.0023579597,0.00012265416,0.000022979793,0.0005357652,0.0014866783,0.00003770816],"category_scores_gemma":[0.0001236283,0.00050806446,0.0002027484,0.0011823066,0.00019165849,0.0001898878,0.000016768705,0.0008881275,0.000015661362],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000081161386,0.00014193587,0.008641991,0.0023962997,0.0012135532,0.00006332574,0.0013708426,0.022025282,0.069014296,0.08586298,0.024648173,0.7845402],"study_design_scores_gemma":[0.0013527869,0.00036283932,0.007474043,0.0033081134,0.00066168443,0.00011564891,0.0026170735,0.00955344,0.34691715,0.0049924823,0.6203056,0.0023391529],"about_ca_topic_score_codex":0.0037842628,"about_ca_topic_score_gemma":0.042933535,"teacher_disagreement_score":0.782201,"about_ca_system_score_codex":0.00040002877,"about_ca_system_score_gemma":0.00037619742,"threshold_uncertainty_score":0.9998096},"labels":[],"label_agreement":null},{"id":"W1519032648","doi":"10.3846/13928619.2007.9637780","title":"MANAGERIAL AND ECONOMIC OPTIMISATIONS FOR PREFABRICATED BUILDING SYSTEMS","year":2007,"lang":"en","type":"article","venue":"Technological and Economic Development of Economy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Simple (philosophy); Point (geometry); Architectural engineering; Computer science; Risk analysis (engineering); Environmental economics; Business; Economics; Engineering; Mathematics","score_opus":0.01536978068560412,"score_gpt":0.20537390783205434,"score_spread":0.1900041271464502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1519032648","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91169405,0.0001841132,0.0807822,0.000042943775,0.00025809393,0.0002843562,0.000008162147,0.00021358661,0.0065325107],"genre_scores_gemma":[0.9771964,0.00003883336,0.022599058,0.0000044308704,0.00003503322,0.00006773308,0.0000076700535,0.000008188959,0.000042664724],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99927163,0.0000018913587,0.0003980592,0.00017060497,0.0000089605965,0.00014886132],"domain_scores_gemma":[0.99977016,0.000045860415,0.00006488389,0.000070646456,0.0000071384156,0.000041288415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021813574,0.000108047134,0.00018426223,0.00012977068,0.00007211736,0.000036445377,0.000068438625,0.00012732032,0.00002934589],"category_scores_gemma":[0.0000039105357,0.000106510925,0.000019868541,0.000017581782,0.000089753696,0.00011724916,0.000028784261,0.00005154861,0.0000073175324],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052328665,0.000023657649,0.0049255244,0.00023928136,0.00028271507,5.543615e-7,0.00016084386,0.005160993,0.0032308819,0.64371437,0.0004652691,0.34174356],"study_design_scores_gemma":[0.0044610337,0.00024047501,0.022821337,0.00016258145,0.00010465927,0.00013956075,0.0029285213,0.3061705,0.083707824,0.043632425,0.5333501,0.0022809978],"about_ca_topic_score_codex":0.0000046089895,"about_ca_topic_score_gemma":0.000011312046,"teacher_disagreement_score":0.600082,"about_ca_system_score_codex":0.00011628088,"about_ca_system_score_gemma":0.000017426819,"threshold_uncertainty_score":0.43433893},"labels":[],"label_agreement":null},{"id":"W1524592758","doi":"10.1520/stp158620140033","title":"Feedback from the Source Improving Productivity on Construction Jobsites","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Computer science; Economics; Economic growth","score_opus":0.007159247921645585,"score_gpt":0.1621446157154688,"score_spread":0.15498536779382321,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1524592758","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025015876,0.00027246872,0.054094132,0.00031713906,0.002998652,0.00035371305,0.00004311403,0.00087036943,0.9385488],"genre_scores_gemma":[0.2347785,0.00011963286,0.0028827805,0.00037916205,0.00669349,0.000044413675,0.0002015517,0.00027547323,0.754625],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991338,0.000013264328,0.00022841779,0.00030206947,0.00018985264,0.0001325774],"domain_scores_gemma":[0.9992809,0.000107538275,0.0000865992,0.00042359714,0.00006347968,0.000037856615],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008119359,0.00029885446,0.00021607781,0.00005660571,0.00012064412,0.000090982416,0.00012959965,0.00029081127,0.0009994176],"category_scores_gemma":[0.000021047374,0.00021288072,0.000109636705,0.000020831301,0.0001265892,0.00006772885,0.000020581714,0.0005341993,0.00043725286],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011143969,0.000002075704,0.00006425082,0.000026707523,0.0001035411,2.8904114e-7,0.000060160088,0.0005700612,0.00091811083,0.24012607,0.0075917398,0.75052583],"study_design_scores_gemma":[0.00029699813,0.000060411876,0.000325512,0.00021380463,0.00014942679,0.0000397255,0.00009717657,0.006782289,0.0054382076,0.024225768,0.96152073,0.0008499622],"about_ca_topic_score_codex":0.000074647614,"about_ca_topic_score_gemma":0.00012507151,"teacher_disagreement_score":0.953929,"about_ca_system_score_codex":0.000079249265,"about_ca_system_score_gemma":0.000017884682,"threshold_uncertainty_score":0.9999138},"labels":[],"label_agreement":null},{"id":"W1529431045","doi":"10.1007/978-3-642-03364-3_42","title":"Construction Knowledge Transfer through Interactive Visualization","year":2009,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Laptop; Variety (cybernetics); Computer science; Knowledge transfer; Entertainment; Visualization; Demographics; Installation; Workforce; Population; Knowledge management; Data science; Artificial intelligence","score_opus":0.011112916312637146,"score_gpt":0.2451645409763001,"score_spread":0.23405162466366297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1529431045","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015337311,0.0003826163,0.95854527,0.000034772776,0.002802717,0.0001827428,0.000004807292,0.00023007081,0.037663616],"genre_scores_gemma":[0.93553555,0.0003745121,0.061559476,0.00036227648,0.0015431782,0.000015297781,0.000047862122,0.00008593605,0.00047590828],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988043,0.000011645098,0.00031162423,0.0004265694,0.00023169612,0.0002141726],"domain_scores_gemma":[0.99946463,0.00006626232,0.000036410584,0.00022855667,0.00016149896,0.00004265178],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009446582,0.0002992435,0.00024790099,0.0003569424,0.00009431759,0.00012684296,0.00024504893,0.00028329066,0.000088824505],"category_scores_gemma":[0.00001001322,0.00029344248,0.00007223284,0.00027733267,0.00032967812,0.0004693831,0.000022545879,0.00046558498,0.00003469259],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048372167,0.0000063746156,0.0000055690093,0.000023411416,0.000010010567,0.0000022980046,0.00096678466,0.022145964,0.00032255324,0.044598326,0.000014899079,0.93189895],"study_design_scores_gemma":[0.00052379473,0.00019845241,0.000102667786,0.0009831521,0.00004255509,0.0002442459,0.000003420877,0.66128296,0.02639844,0.28853714,0.0204792,0.001203938],"about_ca_topic_score_codex":0.0000037510085,"about_ca_topic_score_gemma":0.000061119965,"teacher_disagreement_score":0.9353822,"about_ca_system_score_codex":0.00029986957,"about_ca_system_score_gemma":0.00009707026,"threshold_uncertainty_score":0.9999518},"labels":[],"label_agreement":null},{"id":"W1533613473","doi":"","title":"Post Construction HVAC Noise Control","year":2010,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"HVAC; Noise control; Noise (video); Computer science; Automotive engineering; Environmental science; Engineering; Acoustics; Noise reduction; Mechanical engineering; Physics; Air conditioning","score_opus":0.0023174262754202214,"score_gpt":0.15918163860743864,"score_spread":0.15686421233201842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1533613473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.902009,0.00007048663,0.044354115,0.00049686356,0.011458544,0.00023501358,0.0005240232,0.00043813942,0.040413827],"genre_scores_gemma":[0.99777454,0.0000058712085,0.0014567401,0.00022219682,0.00033157246,0.0000067686647,0.000018514578,0.000018156044,0.00016562895],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955374,0.000004105511,0.000112837966,0.000078771096,0.00005728542,0.0001932706],"domain_scores_gemma":[0.9994633,0.000014226203,0.000012913249,0.00013711193,0.000108106986,0.00026434797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000030955547,0.00008943645,0.00007316736,0.00012522071,0.000079126046,0.00004442663,0.000066221815,0.00013672072,0.0004769659],"category_scores_gemma":[0.000037894104,0.000098699486,0.000026467862,0.00008455172,0.00006873784,0.000073396404,0.0000014279259,0.0002674846,0.00012804935],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004555456,0.0000038517005,0.0025194774,0.000026426958,0.000044530323,0.000017474033,0.00011041942,0.0047008265,0.87472713,0.029530086,0.009631206,0.078684025],"study_design_scores_gemma":[0.0031930823,0.00012343872,0.14011651,0.000057659945,0.00036493342,0.0015267949,0.0016341364,0.5764305,0.011408585,0.006157695,0.2566866,0.0023000792],"about_ca_topic_score_codex":0.002774709,"about_ca_topic_score_gemma":0.027525987,"teacher_disagreement_score":0.86331856,"about_ca_system_score_codex":0.00007560927,"about_ca_system_score_gemma":0.00015409247,"threshold_uncertainty_score":0.9902191},"labels":[],"label_agreement":null},{"id":"W1537281386","doi":"","title":"Alarmlocator: A software tool to facilitate the installation of acoustic warning devices in noisy work plants","year":2006,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Workstation; Installation; Software; Computer science; Process (computing); Ceiling (cloud); Work (physics); Engineering; Operating system; Mechanical engineering","score_opus":0.011003232326964044,"score_gpt":0.17970384216614735,"score_spread":0.1687006098391833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1537281386","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9385699,0.00016718102,0.05951398,0.000052681928,0.00036647395,0.00017643871,0.000103960716,0.00006245947,0.0009869298],"genre_scores_gemma":[0.9986441,0.0000064618444,0.001052019,0.00007329582,0.00006119104,0.00001420672,0.000026914196,0.000014468689,0.00010730706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993525,0.000012370286,0.00022729064,0.00009316386,0.000101715836,0.0002129463],"domain_scores_gemma":[0.9996709,0.000053397653,0.00002496964,0.0001296554,0.00004714727,0.0000739067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007811508,0.00010148104,0.00009947541,0.00018941563,0.000056497072,0.000027685115,0.00009580608,0.00007949387,0.00002833825],"category_scores_gemma":[0.00005154408,0.000093085975,0.000020044346,0.00030547395,0.000025128671,0.00006395179,0.000005727787,0.00013359005,0.000022552542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004406411,0.0000027386773,0.017294008,0.000042939475,0.000009304876,0.000005545248,0.0005903882,0.95293844,0.0027005405,0.00010919465,0.003884386,0.022418138],"study_design_scores_gemma":[0.0005164281,0.000044001135,0.8326138,0.00037455905,0.000058442525,0.000029603852,0.0022320026,0.14277864,0.00041803514,0.00060716714,0.019589514,0.0007377622],"about_ca_topic_score_codex":0.009709364,"about_ca_topic_score_gemma":0.122942924,"teacher_disagreement_score":0.81531984,"about_ca_system_score_codex":0.00021833564,"about_ca_system_score_gemma":0.0001161829,"threshold_uncertainty_score":0.99688506},"labels":[],"label_agreement":null},{"id":"W1560069727","doi":"","title":"Optimizing and controlling earthmoving operations using spatial technologies","year":2008,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Concordia University","keywords":"Crew; Global Positioning System; Process (computing); Engineering; Genetic algorithm; Operations research; Industrial engineering; Computer science; Systems engineering","score_opus":0.019166991117658436,"score_gpt":0.24321242833326184,"score_spread":0.2240454372156034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1560069727","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9612232,0.0015319934,0.0037707728,0.000036020305,0.0011899575,0.00041566262,0.000009865699,0.0007226089,0.031099958],"genre_scores_gemma":[0.9944431,0.0012469592,0.00044601248,8.1925594e-7,0.0002158226,0.000004515442,0.00004198832,0.000051132763,0.0035496408],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983948,0.00011706114,0.00025317757,0.00041485234,0.0003597142,0.00046040007],"domain_scores_gemma":[0.99925953,0.00008444367,0.000050769788,0.00028590346,0.0002179382,0.00010142129],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013298915,0.00027086394,0.000327225,0.0012791347,0.0011383523,0.00021795198,0.0002551252,0.00047051723,0.000013881147],"category_scores_gemma":[0.000042980286,0.00032384996,0.00010293183,0.00059611263,0.00023809653,0.00040139921,0.000052667518,0.0011778345,0.000005666412],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012560546,0.00018172829,0.020942682,0.0016779128,0.002396523,0.0037138562,0.008806878,0.14525697,0.6955915,0.026517775,0.0008054985,0.09285264],"study_design_scores_gemma":[0.0028107571,0.000439245,0.008292622,0.0012056465,0.00035122657,0.00067521137,0.04703703,0.60181993,0.31465262,0.00052330294,0.019659135,0.0025332945],"about_ca_topic_score_codex":0.005396366,"about_ca_topic_score_gemma":0.014685619,"teacher_disagreement_score":0.45656294,"about_ca_system_score_codex":0.00044927688,"about_ca_system_score_gemma":0.0003380555,"threshold_uncertainty_score":0.9999214},"labels":[],"label_agreement":null},{"id":"W1573220347","doi":"","title":"Acoustics Week in Canada 2014","year":2014,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Acoustics; Engineering; Telecommunications; Geology; Physics","score_opus":0.0044007061223946585,"score_gpt":0.15343780885815034,"score_spread":0.14903710273575568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1573220347","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81158173,0.0002879535,0.12695993,0.0004910771,0.008278719,0.00027555609,0.00033352384,0.00022056326,0.05157095],"genre_scores_gemma":[0.9987973,0.000030427542,0.00047717048,0.00034217784,0.00015085898,0.000005386803,0.000013727762,0.000021404512,0.00016153735],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993557,0.00000985359,0.00015668455,0.000091126094,0.00008982724,0.00029684306],"domain_scores_gemma":[0.99949914,0.000028540415,0.00001225389,0.00014976277,0.000040230017,0.00027006248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000046153087,0.00010412647,0.00010125028,0.000120448916,0.0000380162,0.00002174155,0.000099409786,0.0000715024,0.00017630307],"category_scores_gemma":[0.000039265353,0.00012082601,0.000012821022,0.00012683248,0.000017845894,0.000037572212,0.0000033488502,0.00017968628,0.00004740525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002439134,0.00000501124,0.009033223,0.00008045412,0.000022565051,0.000040924064,0.000099490266,0.44279012,0.008991331,0.0051000775,0.44986874,0.083965644],"study_design_scores_gemma":[0.00019777256,0.00001615772,0.054308277,0.000027118182,0.000019160525,0.000017812254,0.00031772594,0.8885826,0.00013859897,0.0005847772,0.055400986,0.00038901955],"about_ca_topic_score_codex":0.9637575,"about_ca_topic_score_gemma":0.9978686,"teacher_disagreement_score":0.4457925,"about_ca_system_score_codex":0.0011416177,"about_ca_system_score_gemma":0.0011179654,"threshold_uncertainty_score":0.49271417},"labels":[],"label_agreement":null},{"id":"W157466560","doi":"10.22260/isarc2013/0076","title":"Integration of Uncertain Real-Time Logistics Data for Reactive Scheduling Using Fuzzy Set Theory","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Fuzzy logic; Fuzzy set; Operations research; Discrete event simulation; Uncertain data; Real-time computing; Data mining; Industrial engineering; Mathematical optimization; Simulation; Artificial intelligence; Engineering; Mathematics","score_opus":0.04999149121253673,"score_gpt":0.27481812433806907,"score_spread":0.22482663312553233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W157466560","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9504838,0.00006974814,0.035464358,0.00012803558,0.00039707334,0.0007609695,0.00016997482,0.00012609594,0.012399927],"genre_scores_gemma":[0.96760356,0.000017486838,0.03212557,0.000008107664,0.00009266306,0.000018914372,0.000023521967,0.000020950441,0.00008921846],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993326,0.000005782439,0.0002740624,0.00013943604,0.00012521492,0.00012287221],"domain_scores_gemma":[0.9991471,0.00008949305,0.00016850683,0.00017022919,0.00040227096,0.000022406068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030809166,0.0001115039,0.00016001437,0.000064069034,0.00005533181,0.00003082834,0.00033909682,0.00008351358,0.000021775222],"category_scores_gemma":[0.0003363632,0.00008256173,0.000048390968,0.00015970906,0.00010335695,0.00041760312,0.000068031775,0.00011121344,0.000002867656],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024958188,0.000010204733,0.00013855465,0.00013914845,0.000050779512,8.836688e-9,0.00046924237,0.0012069135,0.94524807,0.045725808,0.0008063615,0.0061799763],"study_design_scores_gemma":[0.00028195084,0.00004337687,0.0002600654,0.00030649442,0.00012376983,0.000009124917,0.004419639,0.60665154,0.2804524,0.107100554,0.00014583637,0.00020525705],"about_ca_topic_score_codex":0.00009553011,"about_ca_topic_score_gemma":0.0000019901433,"teacher_disagreement_score":0.66479564,"about_ca_system_score_codex":0.000055696913,"about_ca_system_score_gemma":0.000023315179,"threshold_uncertainty_score":0.33667696},"labels":[],"label_agreement":null},{"id":"W1582205711","doi":"","title":"L'aménagement d'une cour d'un centre de distribution : optimisation au moyen d'un outil d'aide à la décision","year":2013,"lang":"fr","type":"article","venue":"Archipelago (Université du Québec à Montréal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Philosophy","score_opus":0.004850043366300512,"score_gpt":0.15647291267738328,"score_spread":0.15162286931108276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1582205711","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7338016,0.002103249,0.24586295,0.014149895,0.0007007839,0.00046303272,0.00008465781,0.0002692067,0.002564643],"genre_scores_gemma":[0.9834652,0.0011853277,0.011624689,0.00010096256,0.00028077333,0.000019790492,0.0002259439,0.00006310795,0.0030341968],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99766773,0.00029393556,0.00044182484,0.0004775452,0.00039654,0.00072240207],"domain_scores_gemma":[0.99854404,0.00022514029,0.00017064094,0.00046377978,0.0002025273,0.00039390006],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00031119323,0.00046451608,0.00034197007,0.0001843135,0.00062129705,0.00015611298,0.00035502375,0.0003766199,0.0017111712],"category_scores_gemma":[0.000068143185,0.00054216024,0.0002653462,0.0004451935,0.00021634999,0.00085220084,0.00015938104,0.0005765087,0.000821264],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000070454895,0.00019449345,0.004391169,0.000108389555,0.0003104304,0.00009599834,0.04203054,0.01920846,0.0015245151,0.019378148,0.011580477,0.90110695],"study_design_scores_gemma":[0.005054614,0.0002771712,0.26223806,0.0005765433,0.0010055011,0.0004886297,0.084682725,0.44808927,0.0043717506,0.018533759,0.17274238,0.0019395682],"about_ca_topic_score_codex":0.42359155,"about_ca_topic_score_gemma":0.13357237,"teacher_disagreement_score":0.89916736,"about_ca_system_score_codex":0.0021458329,"about_ca_system_score_gemma":0.0003274376,"threshold_uncertainty_score":0.9999567},"labels":[],"label_agreement":null},{"id":"W1583606335","doi":"10.11606/d.18.2006.tde-19072006-103742","title":"Otimização de seções transversais de concreto armado: aplicação a pórticos planos","year":2006,"lang":"pt","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Adidas (Canada)","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.007334563013633698,"score_gpt":0.2232938335248125,"score_spread":0.2159592705111788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1583606335","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16484378,0.0011103747,0.757607,0.00025839772,0.0025784448,0.0011382485,0.00033122298,0.0013712554,0.070761316],"genre_scores_gemma":[0.9709816,0.00026638235,0.005978312,0.00024436097,0.00031420193,0.00024311527,0.001951734,0.00017493048,0.019845381],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997535,0.00009082551,0.00078360515,0.00051061716,0.00033316176,0.0007467838],"domain_scores_gemma":[0.99893665,0.000120076846,0.0001620335,0.00034273433,0.00017920574,0.00025931935],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00015006823,0.0006836397,0.0005758864,0.0003093348,0.00019896409,0.0002164453,0.00027503862,0.0010893082,0.0030167254],"category_scores_gemma":[0.00003334869,0.0007422657,0.00037498013,0.0003200877,0.000057615405,0.00024386005,0.0000072912926,0.0008271452,0.00025719233],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017632407,0.00058223854,0.010363284,0.0062815105,0.0038903886,0.00030676712,0.037968468,0.20246638,0.17732956,0.052943423,0.09943883,0.40666592],"study_design_scores_gemma":[0.0036115327,0.00027889467,0.0048038075,0.0009838773,0.0016573041,0.00043989145,0.016136225,0.796322,0.15080982,0.0009900855,0.020685323,0.0032812355],"about_ca_topic_score_codex":0.0019849346,"about_ca_topic_score_gemma":0.0009272423,"teacher_disagreement_score":0.8061378,"about_ca_system_score_codex":0.00044220325,"about_ca_system_score_gemma":0.00030744707,"threshold_uncertainty_score":0.99950284},"labels":[],"label_agreement":null},{"id":"W1594483674","doi":"10.1007/11888598_51","title":"Computer Assistance for Sustainable Building Design","year":2006,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Human–computer interaction; Software engineering","score_opus":0.010738023757151702,"score_gpt":0.21309709940650653,"score_spread":0.20235907564935485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1594483674","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000026768843,0.0004193954,0.99415106,0.000044400946,0.0013197855,0.00041256731,0.0000038118321,0.00021242659,0.0034098167],"genre_scores_gemma":[0.08364635,0.000015285925,0.9132847,0.0002001102,0.0013946649,0.000038241047,0.000009909747,0.00006857221,0.0013421674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984717,0.0000074945992,0.00030255562,0.0005037659,0.00026917664,0.00044531142],"domain_scores_gemma":[0.9991259,0.00021368283,0.0000721871,0.0003103783,0.00022415785,0.000053667212],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029801248,0.00031403577,0.00027774324,0.00039105458,0.00017101788,0.00028879708,0.00044069585,0.0002476761,0.000012847503],"category_scores_gemma":[0.000013064709,0.0003090347,0.00008323843,0.00020864692,0.00022342746,0.00026841354,0.00006470924,0.00034408466,0.0000044628077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046269074,0.000003004408,0.0000057642415,0.000079968064,0.0000069271737,0.00001015626,0.00003320048,0.7368191,0.000106227046,0.028962607,0.00064562255,0.23332278],"study_design_scores_gemma":[0.00015900974,0.00005343366,0.000024649926,0.00016605791,0.0000085424945,0.000020924568,1.5678465e-7,0.88659257,0.0020813341,0.0984482,0.012048517,0.0003966012],"about_ca_topic_score_codex":0.000008261119,"about_ca_topic_score_gemma":0.000014552921,"teacher_disagreement_score":0.23292619,"about_ca_system_score_codex":0.00038972555,"about_ca_system_score_gemma":0.00013334166,"threshold_uncertainty_score":0.99993616},"labels":[],"label_agreement":null},{"id":"W1607250175","doi":"","title":"THIRTY METER TELESCOPE (TMT) SITE MERIT FUNCTION","year":2011,"lang":"es","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ontario Ministry of Research and Innovation; British Columbia Knowledge Development Fund; Natural Sciences and Engineering Research Council of Canada; Association of Canadian Universities for Research in Astronomy; California Institute of Technology; Gordon and Betty Moore Foundation; National Science Foundation","keywords":"Physics; Telescope; Metre; Function (biology); Figure of merit; Remote sensing; Astronomy; Optics; Geography","score_opus":0.015302192331344307,"score_gpt":0.1961499278156837,"score_spread":0.18084773548433938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1607250175","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29429016,0.00044916544,0.033593483,0.00011701854,0.0041246642,0.00024231238,0.000033440196,0.00047648416,0.66667324],"genre_scores_gemma":[0.9933053,0.000121808516,0.004960794,0.00009789688,0.00037890958,0.000022584212,0.00001387814,0.000035947785,0.0010628355],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99909157,0.00003794679,0.00025772664,0.00022170425,0.0001613672,0.00022971806],"domain_scores_gemma":[0.99950856,0.000014449224,0.000054090306,0.00026198695,0.00007960904,0.00008132878],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000081877195,0.00020084737,0.00017377804,0.00010987567,0.00008458957,0.000069168294,0.0000914932,0.00019178475,0.009438674],"category_scores_gemma":[0.000012364537,0.00018922689,0.000106763095,0.00017641907,0.00005613796,0.0002987081,0.000021861133,0.00026718632,0.001659627],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019057913,0.00009092747,0.011671633,0.00022294985,0.0003707869,0.0000102519825,0.0015302902,0.00003628185,0.2891925,0.14413308,0.015321968,0.53722876],"study_design_scores_gemma":[0.002162173,0.00091373763,0.09719402,0.00057679106,0.00096948625,0.00015207873,0.0012007522,0.019221522,0.280317,0.0408285,0.5541843,0.0022795906],"about_ca_topic_score_codex":0.000057798756,"about_ca_topic_score_gemma":0.000019253914,"teacher_disagreement_score":0.6990152,"about_ca_system_score_codex":0.00005160982,"about_ca_system_score_gemma":0.000020997582,"threshold_uncertainty_score":0.9991177},"labels":[],"label_agreement":null},{"id":"W1619770729","doi":"","title":"Managing Innovative Distance Education Projects in a Telework Environment","year":2010,"lang":"en","type":"article","venue":"International journal of e-learning & distance education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Scope (computer science); Project management; Work (physics); Political science; Teamwork; Engineering management; Business; Engineering; Process management; Computer science; Systems engineering","score_opus":0.004230759181651962,"score_gpt":0.23461427181864178,"score_spread":0.2303835126369898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1619770729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8406674,0.00090478244,0.1243102,0.0016848227,0.01590325,0.00026961308,0.0000045325983,0.000077692006,0.016177671],"genre_scores_gemma":[0.99458694,0.00016079235,0.0038157916,0.000055938584,0.00082396663,0.00003350789,0.000024630015,0.000021588323,0.00047686286],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99881923,0.000035804438,0.0005082879,0.00014134476,0.00035932136,0.00013599187],"domain_scores_gemma":[0.9990315,0.000042352593,0.00032604177,0.00010520148,0.0004428748,0.000052020398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002495706,0.00014009437,0.00013226617,0.00039820265,0.000049323986,0.0001062897,0.00025488457,0.00007550774,0.0001351844],"category_scores_gemma":[0.00014154144,0.00014510733,0.00004691892,0.00032602207,0.00005140785,0.00056852464,0.000012916978,0.00076604285,0.000016998858],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014494926,0.0005203921,0.110959925,0.00006512265,0.00010646489,0.0000071191275,0.0041856174,0.012452017,0.0144429635,0.16888581,0.0024094044,0.6858202],"study_design_scores_gemma":[0.0015426201,0.00018249446,0.19885871,0.0016181585,0.000052100237,0.00044962572,0.01827322,0.0120818075,0.0067262915,0.025722776,0.7333749,0.0011172921],"about_ca_topic_score_codex":0.000014156711,"about_ca_topic_score_gemma":0.00005241065,"teacher_disagreement_score":0.7309655,"about_ca_system_score_codex":0.00040657,"about_ca_system_score_gemma":0.00036807917,"threshold_uncertainty_score":0.59173054},"labels":[],"label_agreement":null},{"id":"W1635743658","doi":"10.1109/nafips-wconsc.2015.7284151","title":"Integrating Fuzzy Logic and agent-based modeling for assessing construction crew behavior","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Fuzzy logic; Computer science; Multi-agent system; Behavioral modeling; Artificial intelligence; Systems engineering; Engineering","score_opus":0.054601741443111904,"score_gpt":0.27980562261973346,"score_spread":0.22520388117662155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1635743658","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25193438,0.000111635905,0.7422689,0.0000330984,0.00052839424,0.00014877685,0.0000029056284,0.0002771516,0.004694753],"genre_scores_gemma":[0.85978955,0.0000027604026,0.14000377,0.000035183526,0.00007564306,0.000040757735,0.000015336562,0.000014572922,0.000022442184],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994635,0.000010994187,0.00019237312,0.00012751503,0.000079746715,0.00012589253],"domain_scores_gemma":[0.99969006,0.0000197379,0.000024337836,0.00007267342,0.00012097745,0.00007223035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000118288204,0.000111091045,0.000104923674,0.00007842362,0.00007629719,0.00013337698,0.00003218518,0.00008449623,0.000014425245],"category_scores_gemma":[0.00003221734,0.00009889224,0.000033364762,0.00007424912,0.000031012423,0.000267625,0.000005309346,0.00009285285,0.0000025827094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026554504,0.00003440334,0.0049364804,0.00014014664,0.000038352362,0.0000024703174,0.00040333866,0.13335642,0.01611158,0.10329234,0.0004788825,0.74117905],"study_design_scores_gemma":[0.00041567898,0.000021353897,0.00003513146,0.000025245175,0.00003066701,0.000025530437,0.002441108,0.99172866,0.0018790097,0.003110059,0.00014411949,0.00014342958],"about_ca_topic_score_codex":0.000023456541,"about_ca_topic_score_gemma":0.0000218109,"teacher_disagreement_score":0.8583723,"about_ca_system_score_codex":0.00006234969,"about_ca_system_score_gemma":0.00003402992,"threshold_uncertainty_score":0.40327087},"labels":[],"label_agreement":null},{"id":"W16601101","doi":"10.1073/pnas.0510337103","title":"APPLICATION OF GAMING ENGINES IN SIMULATION DRIVEN VISUALIZATION OF CONSTRUCTION OPERATIONS","year":2011,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Flexibility (engineering); Computer science; Representation (politics); Component (thermodynamics); Systems engineering; Human–computer interaction; Engineering; Data mining","score_opus":0.006411177422959225,"score_gpt":0.2237875179427445,"score_spread":0.2173763405197853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W16601101","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47919223,0.000043667274,0.5198269,0.000016646714,0.00037689306,0.00016007147,0.0000037454463,0.00004443248,0.00033543224],"genre_scores_gemma":[0.968321,0.000098222146,0.031529356,0.000002980783,0.000019877087,0.00000935721,0.000011593495,0.0000071434815,4.4964492e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998144,0.000028414299,0.0014927469,0.000061221115,0.00017136412,0.00010229796],"domain_scores_gemma":[0.9986634,0.000030350384,0.0005980974,0.00012488157,0.00056327827,0.000019949595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024075461,0.00011674618,0.000267992,0.0025771991,0.000025217987,0.000008623551,0.00011570334,0.00027776026,0.000021443655],"category_scores_gemma":[0.00012746922,0.00012446106,0.000051396517,0.0012413902,0.00017309927,0.0015952069,0.000010516122,0.00022332593,0.0000018384019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067576904,0.000048988197,0.10849656,0.00013159159,0.000040398754,4.66427e-7,0.0017116828,0.4952335,0.014588886,0.11549029,0.0000035980504,0.26418644],"study_design_scores_gemma":[0.0016234164,0.00018229689,0.025654806,0.00028967127,0.000040661587,0.00025765973,0.0060361763,0.77677184,0.17792386,0.010892485,0.00009214014,0.00023499154],"about_ca_topic_score_codex":0.000023822675,"about_ca_topic_score_gemma":0.000032589414,"teacher_disagreement_score":0.4891288,"about_ca_system_score_codex":0.00013258723,"about_ca_system_score_gemma":0.00005817341,"threshold_uncertainty_score":0.5075375},"labels":[],"label_agreement":null},{"id":"W1706103706","doi":"10.1016/j.autcon.2015.07.023","title":"Queue performance measures in construction simulation models containing subjective uncertainty","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Queueing theory; Discrete event simulation; Fuzzy logic; Queue; Computer science; Vagueness; Fuzzy set; Event (particle physics); Operations research; Mathematical optimization; Engineering; Simulation; Mathematics; Artificial intelligence","score_opus":0.028349473416736236,"score_gpt":0.24084852429054276,"score_spread":0.21249905087380652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1706103706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8619664,0.00009122666,0.12906897,0.000035498797,0.0016045063,0.00036966056,0.000005795293,0.0005322632,0.0063257013],"genre_scores_gemma":[0.9959169,0.000042039188,0.0037559364,0.000015180661,0.00010346153,0.00009315068,0.00004109001,0.000024844601,0.0000073787287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831337,0.00012491204,0.00067623967,0.00028418368,0.00033502787,0.00026624344],"domain_scores_gemma":[0.99923533,0.0000801135,0.00013915372,0.00017980192,0.00028682538,0.000078773104],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046021756,0.00023250535,0.00025834277,0.0006640678,0.000076779026,0.0000750091,0.00008365307,0.00024657752,0.000022916587],"category_scores_gemma":[0.000091744696,0.0002656096,0.00004363024,0.00078088744,0.00013292689,0.0016087483,0.000011899192,0.00032834808,0.000019735187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007692606,0.0000084865715,0.0182848,0.000020020196,0.0000104121855,7.9734576e-7,0.00096477324,0.8212153,0.00014233637,0.008068459,0.000008430522,0.15119931],"study_design_scores_gemma":[0.0012825977,0.000058666355,0.008509413,0.00010841783,0.000009337794,0.000068227804,0.0029037017,0.97622955,0.0007546134,0.009656329,0.00014787093,0.0002712544],"about_ca_topic_score_codex":0.00023367656,"about_ca_topic_score_gemma":0.0005153235,"teacher_disagreement_score":0.15501432,"about_ca_system_score_codex":0.00091317354,"about_ca_system_score_gemma":0.00013887456,"threshold_uncertainty_score":0.9999796},"labels":[],"label_agreement":null},{"id":"W1712564812","doi":"","title":"Virtual collaboration in the built environment","year":2014,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Plan (archaeology); Higher education; Focus group; Engineering; Engineering management; Sociology; Medical education; Library science; Public relations; Political science; Computer science; Medicine","score_opus":0.010772711085207122,"score_gpt":0.20220906354715812,"score_spread":0.191436352461951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1712564812","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33329585,0.0026319595,0.008629607,0.0058722016,0.0036130757,0.004229433,0.1907555,0.0026699917,0.44830236],"genre_scores_gemma":[0.9945817,0.0000016875229,0.00003247722,0.00007266602,0.00008126662,0.00009950191,0.0050821225,0.0000046830537,0.000043896012],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99977696,0.00001530933,0.000056843935,0.00004181478,0.00006207183,0.00004699428],"domain_scores_gemma":[0.9998786,0.000021865068,0.0000073586143,0.00007837477,0.000005630805,0.00000816584],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000020889862,0.000037305566,0.000026361035,0.000018305886,0.000018045703,0.000025648138,0.00005301868,0.000030887095,0.018701017],"category_scores_gemma":[0.000032605025,0.00002861906,0.000008658107,0.00006126902,0.0000015516985,0.00006014105,0.00000372605,0.000054470434,0.0009860266],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035529906,0.000017847724,0.00015918231,0.0000373205,0.000007992875,0.0000013233812,0.0014465089,0.039297562,0.0010467806,0.0047798213,0.7962376,0.15696453],"study_design_scores_gemma":[0.00011276495,0.000019717823,0.0034401787,0.000058362897,0.0000012453519,0.0000027076153,0.00027340263,0.033424586,0.0011756781,0.00016193076,0.9612514,0.00007805284],"about_ca_topic_score_codex":0.0000010315142,"about_ca_topic_score_gemma":0.000025224692,"teacher_disagreement_score":0.6612858,"about_ca_system_score_codex":0.000018942033,"about_ca_system_score_gemma":0.0000031889651,"threshold_uncertainty_score":0.9997918},"labels":[],"label_agreement":null},{"id":"W1778739278","doi":"","title":"A COURSE ON COMPUTER-AIDED BUILDING DESIGN","year":2004,"lang":"en","type":"article","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Course (navigation); Context (archaeology); Building design; Process (computing); Building information modeling; Engineering; Computer Aided Design; Software; Engineering design process; Architectural engineering; Design process; Engineering management; Systems engineering; Software engineering; Computer science; Work in process; Operations management","score_opus":0.011644720381399508,"score_gpt":0.22508304139386193,"score_spread":0.2134383210124624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1778739278","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18214653,0.00011525522,0.8133084,0.0005251569,0.0012206994,0.00015193698,0.0000022581394,0.00054718833,0.0019825362],"genre_scores_gemma":[0.9708675,0.000013654514,0.028590305,0.00010773281,0.00024990257,0.000013312269,0.0000018869624,0.000024098203,0.00013161227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945337,0.000016710112,0.00010729946,0.00013538293,0.00011927082,0.00016798069],"domain_scores_gemma":[0.999705,0.000030139405,0.000020768366,0.00015630807,0.000026208401,0.00006154118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000071844945,0.00012649772,0.00010377655,0.00007130077,0.00006171329,0.000051640734,0.00007795302,0.00007502695,0.000050321712],"category_scores_gemma":[0.0000070190094,0.00012434741,0.00004166571,0.00013938546,0.000022406115,0.00010277629,0.0000076027873,0.00015137302,0.00019230707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028937618,0.000048952796,0.00009180582,0.000021788146,0.00005999373,0.000020397303,0.00065542705,0.8542194,0.012996637,0.07136186,0.0057707224,0.054724112],"study_design_scores_gemma":[0.007361728,0.001078976,0.010889693,0.0011301868,0.00017320515,0.00041253096,0.0009814211,0.49922392,0.37691084,0.018810313,0.080326736,0.002700453],"about_ca_topic_score_codex":0.000010488647,"about_ca_topic_score_gemma":0.000011938783,"teacher_disagreement_score":0.78872097,"about_ca_system_score_codex":0.0000939445,"about_ca_system_score_gemma":0.000024656949,"threshold_uncertainty_score":0.50707406},"labels":[],"label_agreement":null},{"id":"W185334221","doi":"","title":"Beheren 2.0: Beheren van bouwwerken met BIM","year":2014,"lang":"en","type":"article","venue":"Research Repository (Delft University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Interoperability; Construction industry; Process (computing); Process management; Construct (python library); Business; Information exchange; Engineering; Construction engineering; Knowledge management; Engineering management; Computer science; Operations management; World Wide Web","score_opus":0.012947186648230276,"score_gpt":0.22638593630966558,"score_spread":0.2134387496614353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W185334221","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89561254,0.00024374443,0.006704515,0.0002163501,0.00023233736,0.00021273649,0.0000057186403,0.0007842915,0.095987745],"genre_scores_gemma":[0.9951888,0.000055642693,0.0024855216,0.0000014105287,0.000049380193,0.0000015326996,0.000003552351,0.000014333618,0.0021998293],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989728,0.00007988068,0.00014119128,0.0002147463,0.00030038765,0.00029104223],"domain_scores_gemma":[0.9991262,0.000045517038,0.000039208728,0.00044424488,0.0002647476,0.00008010163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028846296,0.00010682317,0.00017850658,0.0008383869,0.00026566582,0.000020479958,0.0004916436,0.00032526755,0.000098055396],"category_scores_gemma":[0.00004334732,0.0001228348,0.00007004732,0.0006982182,0.0004679384,0.00015669754,0.00011413632,0.00054105086,0.00006420225],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013221361,0.00020073712,0.022694953,0.00033172953,0.0006282505,0.00011011528,0.00045008166,0.0013554544,0.34934703,0.24917372,0.024621557,0.35095417],"study_design_scores_gemma":[0.0020681624,0.0010859038,0.010813512,0.0002947396,0.00012226397,0.0001882418,0.0072731255,0.02322855,0.35799775,0.023047823,0.57296675,0.00091320294],"about_ca_topic_score_codex":0.00015110946,"about_ca_topic_score_gemma":0.000031627562,"teacher_disagreement_score":0.5483452,"about_ca_system_score_codex":0.00012857931,"about_ca_system_score_gemma":0.000046228186,"threshold_uncertainty_score":0.5009058},"labels":[],"label_agreement":null},{"id":"W186078822","doi":"","title":"2039 RESPONSE PREDICTION AND EXPERIMENTAL RESULTS OF A ONE-BAY REINFORCED CONCRETE FRAME","year":2006,"lang":"ja","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bay; Frame (networking); Geology; Engineering; Oceanography; Telecommunications","score_opus":0.007727109664399615,"score_gpt":0.20908923563537624,"score_spread":0.2013621259709766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W186078822","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9686532,0.00037417322,0.0009155416,0.00018109671,0.0005418108,0.00023097455,0.00021941833,0.00012094384,0.02876283],"genre_scores_gemma":[0.9958898,0.000035415993,0.0017918886,0.00001537013,0.00021016208,0.000018891651,0.000045592195,0.000021811727,0.001971098],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99873847,0.00008448881,0.000540048,0.00021927254,0.00022892436,0.000188808],"domain_scores_gemma":[0.9994073,0.00010383574,0.000121055884,0.00022450824,0.000078351564,0.000064971195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025536894,0.00017326702,0.00021122466,0.00013601633,0.000073326904,0.0000454198,0.00006238725,0.00023224673,0.00027057083],"category_scores_gemma":[0.0000646199,0.00019314808,0.000061371655,0.00014622569,0.00015711684,0.00019608102,0.000022478778,0.00020392619,0.00001697127],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025916218,0.0000044077374,0.000070725095,0.0000382301,0.000037703998,0.000001968899,0.0009849552,0.0005662735,0.98648673,0.0064876406,0.0020846166,0.0006451052],"study_design_scores_gemma":[0.003575104,0.0005652279,0.0028294532,0.00025930122,0.00005470221,0.00003892375,0.0010090357,0.072814785,0.91284925,0.0003898441,0.0053292583,0.00028514673],"about_ca_topic_score_codex":0.00010783262,"about_ca_topic_score_gemma":0.0000046828436,"teacher_disagreement_score":0.07363753,"about_ca_system_score_codex":0.00009092346,"about_ca_system_score_gemma":0.00003849643,"threshold_uncertainty_score":0.78763497},"labels":[],"label_agreement":null},{"id":"W1868619901","doi":"10.3233/jid-2003-7306","title":"A DISTRIBUTED MULTIDISCIPLINARY DESIGN OPTIMIZATION FRAMEWORK: TECHNOLOGY INTEGRATION","year":2003,"lang":"en","type":"article","venue":"Journal of Integrated Design and Process Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; National Research Council Canada","funders":"","keywords":"Multidisciplinary approach; Multidisciplinary design optimization; Systems engineering; Computer science; Engineering","score_opus":0.015283747510709237,"score_gpt":0.25484517028735376,"score_spread":0.23956142277664452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1868619901","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010087948,0.0006293392,0.98843205,0.00008544278,0.00037601087,0.00014344916,0.0000021679498,0.00008311499,0.0001604738],"genre_scores_gemma":[0.7233217,0.0001835608,0.27644572,0.000009206646,0.000015436317,0.000008343441,0.0000010959047,0.000008574932,0.000006375995],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989225,0.00006385922,0.00040866205,0.00014908021,0.00025615864,0.00019972127],"domain_scores_gemma":[0.99864113,0.00008289865,0.00016890059,0.00009481403,0.00090990996,0.00010233448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089729665,0.00015429057,0.00017988855,0.00057378004,0.00019621602,0.0001395443,0.0002064625,0.00016058875,0.000035678986],"category_scores_gemma":[0.0007198202,0.00011300528,0.000027458025,0.0019369341,0.00032695098,0.0007801209,0.000006429508,0.00042610653,0.0000016087524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007655648,0.00004169982,0.00024225046,0.000020532207,0.000021009046,0.000008720944,0.0005652396,0.9363812,0.0250695,0.01025973,0.00010060031,0.027212914],"study_design_scores_gemma":[0.00026317345,0.00025336456,0.000039233335,0.00022231248,0.000022919192,0.0005270579,0.002046927,0.8187772,0.15813626,0.019471807,0.00005982919,0.00017989211],"about_ca_topic_score_codex":5.2582567e-7,"about_ca_topic_score_gemma":2.2794559e-7,"teacher_disagreement_score":0.71323377,"about_ca_system_score_codex":0.000115584364,"about_ca_system_score_gemma":0.0003518017,"threshold_uncertainty_score":0.46082214},"labels":[],"label_agreement":null},{"id":"W1870705533","doi":"10.24908/pceea.v0i0.3633","title":"Teaching Building Design and Construction Engineering. Are we ready for the paradigm shift?","year":2011,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; University of British Columbia; McGill University","funders":"","keywords":"Curriculum; Architecture; Engineering; Bridge (graph theory); Engineering management; Building information modeling; Design studio; Studio; Multidisciplinary approach; Paradigm shift; Engineering ethics; Architectural engineering; Operations management; Sociology; Pedagogy","score_opus":0.016969691965954745,"score_gpt":0.203371371467458,"score_spread":0.18640167950150327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1870705533","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52226865,0.007708471,0.3607899,0.044098217,0.04145352,0.010764245,0.00034770713,0.0035728654,0.008996443],"genre_scores_gemma":[0.9823114,0.00005481136,0.016910033,0.000059126112,0.00025488815,0.00020506923,0.000002861986,0.000050120416,0.00015166667],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913555,0.00000620161,0.00027491496,0.00015799871,0.0001588258,0.0002665289],"domain_scores_gemma":[0.9993163,0.000121663536,0.00019653917,0.00009665207,0.00014693836,0.00012191993],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004494541,0.00017975496,0.00015220913,0.00022592359,0.00025916993,0.00010332924,0.0002021158,0.00016475121,0.000008830959],"category_scores_gemma":[0.00029908025,0.00015556917,0.00006468126,0.00022679367,0.00002420766,0.00028975346,0.000010779251,0.00029524276,0.0000012056078],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001637094,0.00004431116,0.017114004,0.00093545695,0.00057492714,1.2346342e-7,0.007488481,0.019811999,0.004497456,0.90413326,0.018408116,0.02697552],"study_design_scores_gemma":[0.0011658375,0.00010119159,0.14544795,0.001222969,0.0007276992,0.0001218269,0.0033324487,0.59375757,0.02047604,0.022501031,0.2092162,0.0019292111],"about_ca_topic_score_codex":0.0015843961,"about_ca_topic_score_gemma":0.0005902719,"teacher_disagreement_score":0.8816322,"about_ca_system_score_codex":0.00079027266,"about_ca_system_score_gemma":0.00013339067,"threshold_uncertainty_score":0.6343927},"labels":[],"label_agreement":null},{"id":"W189148624","doi":"","title":"Construction and cataloguing of nested partially balanced incomplete block designs","year":2004,"lang":"en","type":"article","venue":"Ars Combinatoria","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Block (permutation group theory); Mathematics; Arithmetic; Combinatorics","score_opus":0.011209438732090444,"score_gpt":0.2035605862339142,"score_spread":0.19235114750182378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W189148624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9960649,0.00010880526,0.001770787,0.000028949682,0.0011833146,0.00009217156,0.000004567954,0.00014400583,0.0006025159],"genre_scores_gemma":[0.99826336,0.000021781798,0.0016678881,0.000007571152,0.000008020923,0.000008410216,0.000008771871,0.000011191859,0.0000029836965],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995073,0.000012646449,0.00019493657,0.000097056465,0.00008017755,0.0001078567],"domain_scores_gemma":[0.99973667,0.00001852021,0.000040438503,0.00010674255,0.00005546788,0.000042161657],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000049924634,0.00009148108,0.00012924538,0.00005699278,0.000046276426,0.00001660452,0.000047003887,0.00006630112,0.0000057745415],"category_scores_gemma":[0.000013646317,0.00009775707,0.000022440214,0.000142305,0.000078804354,0.00011483208,0.000010022443,0.00008428346,0.000004713613],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018893488,0.000025020918,0.010143139,0.00007926897,0.000066001085,0.0000036473812,0.00050894683,0.0053136935,0.09922577,0.87426424,0.00007950171,0.0102718845],"study_design_scores_gemma":[0.0057605547,0.0002940891,0.038572405,0.0002864493,0.00010779813,0.00036944338,0.00068909524,0.0068562655,0.3077117,0.6373662,0.0011712882,0.00081474456],"about_ca_topic_score_codex":0.00003671865,"about_ca_topic_score_gemma":0.000022139757,"teacher_disagreement_score":0.23689805,"about_ca_system_score_codex":0.000038775397,"about_ca_system_score_gemma":0.0000227269,"threshold_uncertainty_score":0.39864177},"labels":[],"label_agreement":null},{"id":"W1897731987","doi":"10.24908/pceea.v0i0.3996","title":"LA RECHERCHE D'UNE VALEUR AJOUTÉE CACHÉE DANS UN PROJET DE GÉNIE CIVIL","year":2011,"lang":"fr","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Philosophy; Art","score_opus":0.04041769888343799,"score_gpt":0.2336365386237882,"score_spread":0.1932188397403502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1897731987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6109233,0.0028573659,0.002240358,0.022660665,0.017566545,0.0017289863,0.00030815764,0.0007466925,0.34096795],"genre_scores_gemma":[0.9727762,0.00014641735,0.0137361195,0.00014744021,0.00052956876,0.00013111577,0.000014156696,0.0001023306,0.012416662],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99825996,0.00007398636,0.000500121,0.0002708447,0.00031977706,0.0005753001],"domain_scores_gemma":[0.99826235,0.00014665279,0.000373341,0.0001744493,0.0006805274,0.0003626773],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017075557,0.00030996112,0.00025583387,0.00034291594,0.00019508504,0.00013637186,0.00044759936,0.00090576895,0.00027945635],"category_scores_gemma":[0.0018909223,0.0003470888,0.00017348175,0.0010949648,0.00006153843,0.0004578943,0.000026294501,0.0010891154,0.00003728666],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015607287,0.00040892002,0.32937798,0.0025053315,0.0011027845,0.0000016992417,0.0933872,0.0020021617,0.018367378,0.3767695,0.10801196,0.068049446],"study_design_scores_gemma":[0.0010356093,0.00009974123,0.65019464,0.001979352,0.0009558125,0.00021909631,0.011887177,0.016182829,0.062183384,0.024911352,0.22832899,0.002021985],"about_ca_topic_score_codex":0.062550835,"about_ca_topic_score_gemma":0.04389509,"teacher_disagreement_score":0.3618529,"about_ca_system_score_codex":0.008748938,"about_ca_system_score_gemma":0.0017357856,"threshold_uncertainty_score":0.99989814},"labels":[],"label_agreement":null},{"id":"W1910474328","doi":"10.14359/51686448","title":"Computer-Aided Mold Design Algorithm for Precast Concrete Elements","year":2014,"lang":"en","type":"article","venue":"ACI Materials Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Geography; Sierra leone; Ancient history; Environmental protection; Ethnology; History","score_opus":0.016173680046957673,"score_gpt":0.22015717518067768,"score_spread":0.20398349513372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1910474328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08374166,0.00002685424,0.9124787,0.000022718557,0.003384088,0.00015157986,0.000022883576,0.00008450585,0.00008702553],"genre_scores_gemma":[0.548127,0.00004999238,0.44875804,0.00013052167,0.0027291188,0.000046755576,0.00002229541,0.00004659419,0.000089727626],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992301,0.000064620726,0.00034294554,0.00008167589,0.000096347314,0.00018432898],"domain_scores_gemma":[0.9996554,0.00003564342,0.000084595005,0.00007970588,0.00007901954,0.00006558432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040837642,0.00011545683,0.00016254453,0.000054171483,0.0000979419,0.00020624502,0.00009619031,0.00006463691,0.00027888844],"category_scores_gemma":[0.00001063873,0.000103055776,0.000039924,0.000029907931,0.000014850811,0.0001796193,0.000008782205,0.00006638597,0.000029242587],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030318712,0.000003579965,0.000013608258,0.0000366415,0.00012028116,0.0000025577435,0.00009799397,0.0011152526,0.54451156,0.0007710434,0.010485971,0.4428112],"study_design_scores_gemma":[0.0017380022,0.00030042,0.00015949339,0.00008845654,0.000051295683,0.00068744144,0.000028362145,0.26394856,0.7099857,0.003042756,0.019625105,0.0003444117],"about_ca_topic_score_codex":0.0000010301694,"about_ca_topic_score_gemma":1.2917444e-7,"teacher_disagreement_score":0.4643853,"about_ca_system_score_codex":0.000032003667,"about_ca_system_score_gemma":0.000010757129,"threshold_uncertainty_score":0.42024928},"labels":[],"label_agreement":null},{"id":"W1911228455","doi":"10.1139/l2012-042","title":"Fleet selection for earthmoving projects using optimization-based simulation","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Global Positioning System; Truck; Scope (computer science); Engineering; Cost estimate; Software; Duration (music); Work (physics); Transport engineering; Operations research; Computer science; Simulation; Systems engineering; Automotive engineering","score_opus":0.014553981764116907,"score_gpt":0.20521750130864144,"score_spread":0.19066351954452454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1911228455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021456119,0.0003587475,0.9765102,0.000008377569,0.0012811697,0.00010721089,0.0000041685944,0.000043781398,0.00023017992],"genre_scores_gemma":[0.9819017,0.0000010346124,0.017528003,0.000010783807,0.00051494956,0.0000038562544,0.0000033380038,0.00003146746,0.0000048885404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939567,0.0000068291765,0.00023498177,0.000042588024,0.00007506198,0.0002448951],"domain_scores_gemma":[0.9994613,0.000045649358,0.000057432768,0.000042892323,0.00016681303,0.00022593341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015520789,0.00009980823,0.00010841715,0.00040999695,0.000073236566,0.000046803823,0.000043946868,0.000074333795,0.00006769156],"category_scores_gemma":[0.000088674125,0.00011184831,0.00006126704,0.000221551,0.0000071409067,0.00042527137,7.5432445e-7,0.0001176475,5.884757e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019959573,0.0000013875853,0.0016668502,0.000036029447,0.000018503848,2.6272298e-7,0.00009507151,0.996736,0.0006178105,0.00011440978,0.000045659828,0.0006660096],"study_design_scores_gemma":[0.00018436482,0.000019012528,0.00019599141,0.00006869969,0.00002442506,0.000030089719,0.00002586322,0.9962061,0.0008081631,0.0000053295225,0.0023173254,0.000114633505],"about_ca_topic_score_codex":0.00006882938,"about_ca_topic_score_gemma":0.0031327645,"teacher_disagreement_score":0.9604456,"about_ca_system_score_codex":0.00025305233,"about_ca_system_score_gemma":0.00021526274,"threshold_uncertainty_score":0.4561042},"labels":[],"label_agreement":null},{"id":"W1914395968","doi":"","title":"BEST PAPER / MEILLEURE COMMUNICATION: Development of a Classification System for Patients Referred to a Rehabilitation Program for Visual Impairment : A Method for Analysis and Budget Control","year":2009,"lang":"en","type":"article","venue":"ASAC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Rehabilitation; Visual impairment; Physical medicine and rehabilitation; Control (management); Computer science; Psychology; Artificial intelligence; Audiology; Speech recognition; Medicine; Physical therapy; Psychiatry","score_opus":0.010992285263839342,"score_gpt":0.2989241828829373,"score_spread":0.287931897619098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1914395968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11464424,0.00006173371,0.8808798,0.0003947953,0.00007974827,0.0037003194,0.00006902138,0.00010743601,0.0000628761],"genre_scores_gemma":[0.6644829,0.000001343377,0.33275807,0.000015571983,0.000010465828,0.002577812,0.00013841478,0.0000069853,0.0000084604635],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992275,0.000031329702,0.0003991129,0.00014992489,0.00008540815,0.0001067049],"domain_scores_gemma":[0.9990966,0.00023390347,0.000092273396,0.00015042246,0.0003835537,0.000043273776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002875757,0.000099213896,0.00021172204,0.00014142887,0.000093488416,0.000023587954,0.000055148215,0.00006981627,0.0000010630048],"category_scores_gemma":[0.00007365519,0.0000929666,0.00008758449,0.00021181826,0.000009452361,0.00008595796,0.0000035628284,0.000025729463,3.240825e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042628543,0.00038191208,0.0021510948,0.00043905556,0.000509092,5.14767e-9,0.0022243056,0.0005393966,0.0030783233,0.005177521,0.00045404665,0.98461896],"study_design_scores_gemma":[0.009792099,0.0066155787,0.20720175,0.00031658047,0.0017547335,0.0000013371391,0.0071560913,0.7243478,0.004540979,0.0008764522,0.036640488,0.00075614767],"about_ca_topic_score_codex":0.0000032146388,"about_ca_topic_score_gemma":0.000039163722,"teacher_disagreement_score":0.9838628,"about_ca_system_score_codex":0.0001174427,"about_ca_system_score_gemma":0.00002107597,"threshold_uncertainty_score":0.3791068},"labels":[],"label_agreement":null},{"id":"W1916505624","doi":"10.22260/isarc2015/0065","title":"Robotic Kinematics Analogy for Realignment of Defective Construction Assemblies","year":2015,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Kinematics; Inverse kinematics; Computer science; Analogy; Robotics; Artificial intelligence; Degrees of freedom (physics and chemistry); State (computer science); Robot; Download; Programming language; Operating system","score_opus":0.022008234063471944,"score_gpt":0.22904870889861603,"score_spread":0.2070404748351441,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1916505624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9503433,0.00015069207,0.020495903,0.00024062807,0.001176279,0.00059230113,0.000014783504,0.000105880696,0.026880207],"genre_scores_gemma":[0.9910642,0.000009006608,0.008793835,0.000005780518,0.000048966613,0.000027082167,0.0000010756113,0.000010347141,0.000039735933],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999487,0.000002565413,0.00022418461,0.00006873277,0.00013049353,0.000087050976],"domain_scores_gemma":[0.9994185,0.00002579552,0.00012069368,0.00005105007,0.00035766987,0.000026293568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001297592,0.00007707346,0.00015451631,0.00006642201,0.000023017481,0.000009764952,0.00009800445,0.00005458277,0.000003307229],"category_scores_gemma":[0.00010112517,0.00005854477,0.00006457098,0.00014914444,0.00008703838,0.000099189005,0.00001719393,0.000052975385,7.1191414e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011171899,0.00007868012,0.0213506,0.0015694858,0.0003838728,4.8294808e-8,0.0040948885,0.017583609,0.22771953,0.6992168,0.013854268,0.01403649],"study_design_scores_gemma":[0.0013507234,0.00033573835,0.00432886,0.00032964416,0.00031092574,0.00007843218,0.013246289,0.04943149,0.7649805,0.16417205,0.0010846453,0.0003506772],"about_ca_topic_score_codex":0.000010896858,"about_ca_topic_score_gemma":0.0000034289728,"teacher_disagreement_score":0.537261,"about_ca_system_score_codex":0.00005475239,"about_ca_system_score_gemma":0.000016401715,"threshold_uncertainty_score":0.23873864},"labels":[],"label_agreement":null},{"id":"W1916836594","doi":"","title":"Engineering and Acoustic Design Experts","year":2015,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural acoustics; Engineering; Telecommunications; Acoustics; Business; Electrical engineering; Physics","score_opus":0.017880789223244993,"score_gpt":0.18035080372890672,"score_spread":0.16247001450566173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1916836594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07085432,0.00096979423,0.9219474,0.00006850417,0.0018921198,0.00014586066,0.000019435245,0.00033153905,0.0037710103],"genre_scores_gemma":[0.99465424,0.000024682577,0.0049833353,0.0000638851,0.00012336053,0.000008351127,0.000003126299,0.000020709114,0.000118338816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962056,0.000004207581,0.00007698609,0.0000699603,0.000053914886,0.00017439625],"domain_scores_gemma":[0.9994438,0.000017895047,0.0000050906992,0.00008075413,0.000039857587,0.00041258716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004585347,0.000083846084,0.00006368923,0.00010732349,0.000026304073,0.000039277216,0.00004054877,0.00007183475,0.000023190434],"category_scores_gemma":[0.000054920973,0.00009249366,0.000008109742,0.000079462414,0.000016708784,0.00006107502,0.000003034621,0.000067813984,0.000019305615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015993957,0.0000015235198,0.00010433419,0.000026308362,0.00002075511,0.000032923694,0.00049434317,0.9107488,0.021845216,0.000881449,0.051888943,0.0139538115],"study_design_scores_gemma":[0.00013344862,0.000013087371,0.0003886296,0.0000138114465,0.00001694561,0.00007225241,0.0003347419,0.9904596,0.0002524534,0.00015699031,0.007974386,0.00018365019],"about_ca_topic_score_codex":0.0005937533,"about_ca_topic_score_gemma":0.000788003,"teacher_disagreement_score":0.9237999,"about_ca_system_score_codex":0.00016514446,"about_ca_system_score_gemma":0.000110639085,"threshold_uncertainty_score":0.37717822},"labels":[],"label_agreement":null},{"id":"W1923587564","doi":"","title":"Expertises en ingénierie et design acoustique","year":2015,"lang":"fr","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Humanities; Political science; Physics; Art","score_opus":0.03120220944071651,"score_gpt":0.23865563335705356,"score_spread":0.20745342391633706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1923587564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006471327,0.0077603417,0.9545472,0.003910024,0.009188151,0.0002735999,0.00026037844,0.00018907382,0.017399862],"genre_scores_gemma":[0.93736184,0.00065353664,0.051237363,0.0013264886,0.0011204638,0.0000395794,0.000044459444,0.0001006492,0.008115619],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99874055,0.00012954356,0.000263439,0.00019827482,0.00015490755,0.00051328767],"domain_scores_gemma":[0.9983213,0.00009865952,0.000035748053,0.00024276868,0.00021767362,0.0010838796],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000272321,0.00024893906,0.00018820111,0.0002101583,0.000080896934,0.00014353603,0.00016954358,0.00044291673,0.000465601],"category_scores_gemma":[0.00037804016,0.00030667486,0.00004666972,0.00023879595,0.000110638735,0.0002541058,0.000013455703,0.00042163135,0.0003430564],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009788381,0.000016059443,0.00016277641,0.00008972878,0.00008872827,0.00021226784,0.005513508,0.4331847,0.009610473,0.029317481,0.44020236,0.08159214],"study_design_scores_gemma":[0.00082328374,0.00020794629,0.0013662117,0.00034047425,0.0002345023,0.0005375098,0.0075809667,0.5032581,0.0019646247,0.0094442,0.4729357,0.001306483],"about_ca_topic_score_codex":0.04598468,"about_ca_topic_score_gemma":0.024220677,"teacher_disagreement_score":0.9308905,"about_ca_system_score_codex":0.0015377443,"about_ca_system_score_gemma":0.0024400055,"threshold_uncertainty_score":0.99993855},"labels":[],"label_agreement":null},{"id":"W1938740575","doi":"10.1016/j.proeng.2015.08.450","title":"A Building Information Management (BIM) Framework and Supporting Case Study for Existing Building Operations, Maintenance and Sustainability","year":2015,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":185,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Facility management; Documentation; Systems engineering; Information model; Process (computing); Construction engineering; Process management; Building design; Key (lock); Building management; Sustainability; Computer science; Engineering; Engineering management; Risk analysis (engineering); Scheduling (production processes); Architectural engineering; Software engineering; Operations management","score_opus":0.012360789326435506,"score_gpt":0.2648918829771005,"score_spread":0.25253109365066495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1938740575","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46933004,0.00010573547,0.52960306,0.0000202244,0.00016850325,0.000534759,0.0000023409314,0.00020960608,0.00002572069],"genre_scores_gemma":[0.84705144,0.000007733514,0.15253577,0.000008502535,0.00007562374,0.00029705654,0.0000023136122,0.00001814655,0.0000034367924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991272,0.0000062352096,0.00034256236,0.0001637666,0.00010285561,0.00025738112],"domain_scores_gemma":[0.9995113,0.000059692044,0.000033053508,0.00010136639,0.00018467072,0.00010993285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045266334,0.00016463628,0.00014205994,0.00015849018,0.00012244108,0.00019113552,0.00004621346,0.00006196755,7.1352116e-7],"category_scores_gemma":[0.00053072674,0.00017546419,0.000017529892,0.00018225057,0.000014413018,0.0007262695,0.00004357136,0.00015451675,2.5325608e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003197649,0.000041123705,0.0102852415,0.0039555775,0.00016749828,0.00010730193,0.01486275,0.56683385,0.00023062847,0.15989384,0.00008219686,0.24350803],"study_design_scores_gemma":[0.0006208666,0.000067180415,0.00029691227,0.0001118633,0.000044554632,0.000585005,0.021097215,0.97309035,0.00018943739,0.0027338802,0.00085608294,0.00030667076],"about_ca_topic_score_codex":0.000025939176,"about_ca_topic_score_gemma":0.00000730464,"teacher_disagreement_score":0.4062565,"about_ca_system_score_codex":0.00015536787,"about_ca_system_score_gemma":0.000020012023,"threshold_uncertainty_score":0.7155222},"labels":[],"label_agreement":null},{"id":"W1939123876","doi":"","title":"WSP GLOBAL – Acoustic, Noise and Vibration Services","year":2015,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Excellence; Noise control; Status quo; Engineering; Computer science; Architectural engineering; Political science; Artificial intelligence","score_opus":0.007251295349360982,"score_gpt":0.18699859553542028,"score_spread":0.1797473001860593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1939123876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84929156,0.0010109902,0.110375516,0.0003530548,0.0031945966,0.00023479841,0.00034615115,0.00042383492,0.03476948],"genre_scores_gemma":[0.998446,0.00002206396,0.0010231329,0.00023980826,0.00016405359,0.0000041488256,0.000026600712,0.000010047602,0.000064174674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995981,0.000005269411,0.00009107321,0.000080212325,0.00007174288,0.00015364225],"domain_scores_gemma":[0.9994369,0.000004984605,0.000010637717,0.00008714343,0.00007349243,0.00038684835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000031771266,0.000084222025,0.00006309984,0.000036705205,0.000044762575,0.00007202197,0.000049507827,0.00008986692,0.00002522188],"category_scores_gemma":[0.00001092031,0.00009171885,0.000009226283,0.00010767672,0.00002539504,0.00012448488,0.000004552707,0.00006087043,0.00004000212],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003248431,0.000025833044,0.03629537,0.00068914756,0.00020983646,0.00013593894,0.0028654072,0.5370247,0.050228976,0.03236136,0.1274378,0.21269317],"study_design_scores_gemma":[0.0004664157,0.000039709597,0.038038433,0.00003587373,0.00008158395,0.00011819592,0.0018733937,0.94051063,0.00016214066,0.0030024266,0.01523844,0.00043275286],"about_ca_topic_score_codex":0.0045758733,"about_ca_topic_score_gemma":0.041131545,"teacher_disagreement_score":0.40348595,"about_ca_system_score_codex":0.0002180831,"about_ca_system_score_gemma":0.00013839228,"threshold_uncertainty_score":0.9763653},"labels":[],"label_agreement":null},{"id":"W1943878062","doi":"","title":"Bridging the gap between building science and design studios","year":2002,"lang":"en","type":"article","venue":"University of North Texas Digital Library (University of North Texas)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Public Works and Government Services Canada; Government of Canada; Australian Government; California Energy Commission; U.S. Department of Energy","keywords":"Bridging (networking); Studio; Computer science; Bridge (graph theory); Process (computing); Engineering design process; Design tool; Software engineering; Architectural engineering; Systems engineering; Engineering; Mechanical engineering; Programming language","score_opus":0.01757098433944888,"score_gpt":0.16336137015746016,"score_spread":0.1457903858180113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1943878062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9811388,0.00011964845,0.01393703,0.00017278343,0.000060187278,0.00019362982,0.00018163929,0.00018233474,0.004013898],"genre_scores_gemma":[0.9978908,0.00013742331,0.001271242,0.0000109152115,0.000028200893,1.1582223e-8,0.000014185229,0.000011680409,0.0006355801],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99902964,0.00002479843,0.00012160229,0.0002561739,0.00032864965,0.00023916025],"domain_scores_gemma":[0.9993349,0.000089768575,0.00010758491,0.00023660607,0.00009889351,0.00013226138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006907964,0.00016376462,0.00022897335,0.00030079504,0.00040852462,0.00006727207,0.00063704484,0.000048004054,0.00010957456],"category_scores_gemma":[0.000013354146,0.00018605111,0.00008124985,0.00087527605,0.0009516923,0.0030935307,0.00026816974,0.00018862312,0.000027219448],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013926119,0.000020045423,0.9135443,0.000034196084,0.00006849391,0.000013995992,0.00014504153,0.0009667236,0.0000014501244,0.00032029592,0.0017940311,0.083077505],"study_design_scores_gemma":[0.00035950882,0.0000648199,0.9821466,0.000036782538,0.000056848392,0.000008494425,0.00011501534,0.008242482,0.000057105288,0.000045931443,0.00864728,0.00021913275],"about_ca_topic_score_codex":0.00004626973,"about_ca_topic_score_gemma":0.00005672452,"teacher_disagreement_score":0.08285837,"about_ca_system_score_codex":0.00004884049,"about_ca_system_score_gemma":0.00005345939,"threshold_uncertainty_score":0.7586944},"labels":[],"label_agreement":null},{"id":"W1957508919","doi":"10.1139/cjce-2014-0078","title":"A conceptual approach to track design changes within a multi-disciplinary building information modeling environment","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada); University of British Columbia","funders":"","keywords":"Track (disk drive); Computer science; Discipline; Civil engineering; Architectural engineering; Engineering","score_opus":0.04122999055739158,"score_gpt":0.19911290062468484,"score_spread":0.15788291006729327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1957508919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02720858,0.0004501868,0.9711469,0.000041188217,0.00063046813,0.0001188429,0.0000052143623,0.000041950898,0.00035668703],"genre_scores_gemma":[0.9441779,0.0000060022367,0.05560983,0.000022440267,0.0001430504,0.000011488179,0.0000025149363,0.000020245614,0.0000065052527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992247,0.000011740892,0.00032243098,0.000061283026,0.00015402102,0.00022581665],"domain_scores_gemma":[0.9991663,0.000009459388,0.00005059179,0.0000822652,0.00007465149,0.00061670406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030584753,0.00014091683,0.00015667953,0.0004306422,0.00004214332,0.00006827857,0.00012808197,0.000078460616,0.000010864814],"category_scores_gemma":[0.000048775004,0.00014559839,0.000037348025,0.00014039359,0.000015629888,0.0004907641,0.000006255484,0.00023294696,0.000007311791],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003837253,0.0000020297396,0.000011014464,0.000012322947,0.000020771393,0.0000033342017,0.0055209408,0.9924231,0.0004514363,0.0005766526,0.0002266869,0.0007478363],"study_design_scores_gemma":[0.0003122163,0.000052212097,0.000017619588,0.00007270718,0.000013723069,0.00015115616,0.0019589928,0.9948131,0.0004286307,0.00003472098,0.0019753976,0.00016955023],"about_ca_topic_score_codex":0.00007127877,"about_ca_topic_score_gemma":0.0012684702,"teacher_disagreement_score":0.91696936,"about_ca_system_score_codex":0.0003752116,"about_ca_system_score_gemma":0.00017202953,"threshold_uncertainty_score":0.593733},"labels":[],"label_agreement":null},{"id":"W1961945644","doi":"","title":"WSP GLOBAL – Acoustique, bruit et vibrations","year":2015,"lang":"fr","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.019133556305447136,"score_gpt":0.24201670971297193,"score_spread":0.2228831534075248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1961945644","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011847976,0.0077639734,0.6891459,0.016704768,0.020790797,0.0004122206,0.0032323224,0.00036293728,0.24973908],"genre_scores_gemma":[0.9645856,0.00026296746,0.019641105,0.001953242,0.0012586004,0.000021801474,0.0001768361,0.000060959414,0.012038864],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987483,0.000050791357,0.0002841392,0.00020617981,0.00018597864,0.0005245814],"domain_scores_gemma":[0.9980587,0.000027364746,0.00004070601,0.00027312274,0.00031295916,0.0012871517],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00014442667,0.00024012779,0.000172525,0.0001221901,0.00011695942,0.00020622791,0.00016844276,0.0004089491,0.0007007444],"category_scores_gemma":[0.00017060972,0.00030910014,0.000062178726,0.00044041147,0.00012508735,0.00030844234,0.000014815527,0.00035318587,0.00079502264],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030080423,0.000014641867,0.0007740847,0.000054125125,0.000068553614,0.00007415762,0.00045538385,0.16327788,0.00047733108,0.28742078,0.5128864,0.034493662],"study_design_scores_gemma":[0.000774528,0.00011358028,0.01174659,0.00017438058,0.00032479232,0.00056982675,0.002565637,0.35685152,0.00008106819,0.029126225,0.59661776,0.0010540822],"about_ca_topic_score_codex":0.09007129,"about_ca_topic_score_gemma":0.26140895,"teacher_disagreement_score":0.9527376,"about_ca_system_score_codex":0.0020816491,"about_ca_system_score_gemma":0.0031561113,"threshold_uncertainty_score":0.99998295},"labels":[],"label_agreement":null},{"id":"W1963500213","doi":"10.5555/1030453.1030704","title":"CEPM 1: special purpose simulation modeling of tower cranes","year":2002,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"","keywords":"Tower; Tower crane; Computer science; Resource (disambiguation); Set (abstract data type); Simulation modeling; Lift (data mining); Industrial engineering; Duration (music); Simulation; Engineering; Operations research; Systems engineering; Civil engineering; Data mining","score_opus":0.04232238322040434,"score_gpt":0.24000650120023181,"score_spread":0.1976841179798275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963500213","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15252511,0.000063420994,0.81925505,0.000040672934,0.0010644925,0.00015643159,0.000008722444,0.00018630168,0.026699776],"genre_scores_gemma":[0.99875444,0.000010121545,0.0003832727,0.000016989688,0.0004772488,0.000005043535,0.000009117163,0.000014022279,0.00032976945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921876,0.000016682045,0.00034270386,0.0001407871,0.00016273021,0.000118354525],"domain_scores_gemma":[0.99948186,0.000050144994,0.000047263376,0.00015817514,0.00022464352,0.000037902348],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000041897747,0.00012725971,0.00014161246,0.00011496243,0.00003817615,0.00004383073,0.000085580905,0.00009210833,0.0036615955],"category_scores_gemma":[0.000026560374,0.0001309154,0.000060178427,0.00012215014,0.000028954872,0.0003410847,0.000010417746,0.00010159586,0.00006206959],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008636713,0.000010700015,0.00019631482,0.000013015748,0.000010359801,2.8888348e-7,0.00066749123,0.9601437,0.0003750391,0.00092280563,0.0000654167,0.037586246],"study_design_scores_gemma":[0.0002307696,0.000017258566,0.00010603275,0.000037114587,0.00001039604,9.83498e-7,0.00007345003,0.9961662,0.00038205262,0.00078385434,0.002059713,0.00013213152],"about_ca_topic_score_codex":0.000003880721,"about_ca_topic_score_gemma":0.000011436703,"teacher_disagreement_score":0.8462293,"about_ca_system_score_codex":0.000029221683,"about_ca_system_score_gemma":0.0000055929304,"threshold_uncertainty_score":0.9972492},"labels":[],"label_agreement":null},{"id":"W1963926375","doi":"10.1139/l06-124","title":"Modeling and coordinating building systems in three dimensions: a case study","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Context (archaeology); Systems engineering; Constructability; Computer science; Identification (biology); Domain (mathematical analysis); Process modeling; Software engineering; Engineering; Work in process","score_opus":0.008525242788431744,"score_gpt":0.18717234129992627,"score_spread":0.17864709851149452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963926375","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9329686,0.0038348804,0.06238219,0.0000060690572,0.0005718584,0.00008721643,0.0000013402788,0.00002413988,0.0001236856],"genre_scores_gemma":[0.9994761,0.000004523643,0.00036103913,0.0000012521149,0.00012953972,0.00000437332,1.6770404e-7,0.00002133292,0.000001701276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928063,0.000009120997,0.0003743957,0.00006756,0.000074962256,0.00019330878],"domain_scores_gemma":[0.9996718,0.000026094729,0.000030389094,0.000060878378,0.00006479716,0.0001460195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022649071,0.00010981709,0.0001703069,0.00052126753,0.000054838172,0.00008181018,0.00004748101,0.000047939986,0.0000039956963],"category_scores_gemma":[0.000028640588,0.000116244344,0.000024567973,0.00020014061,0.0000073782453,0.00020458609,0.0000036443514,0.0002440107,1.9940197e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.9903412e-7,0.0000022148688,0.0051469738,0.000023992563,0.000013371863,0.0011219176,0.00018344428,0.9919325,0.00034056584,0.00080282206,0.0000089260975,0.00042284504],"study_design_scores_gemma":[0.00027613333,0.000019803305,0.0004076934,0.0001925489,0.000013562819,0.005381823,0.0013113106,0.99212265,0.000010069667,0.000101789046,0.000044604403,0.000118005104],"about_ca_topic_score_codex":0.017669372,"about_ca_topic_score_gemma":0.42070034,"teacher_disagreement_score":0.40303096,"about_ca_system_score_codex":0.00016364481,"about_ca_system_score_gemma":0.00006195409,"threshold_uncertainty_score":0.98887205},"labels":[],"label_agreement":null},{"id":"W1964796479","doi":"10.1016/j.autcon.2008.03.002","title":"IT usage in Alberta's building construction projects: Current status and challenges","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Lagging; Unavailability; Construction industry; Stakeholder; Information technology; Construction management; Engineering; Information and Communications Technology; Business; Engineering management; Knowledge management; Construction engineering; Public relations; Computer science; Civil engineering","score_opus":0.024102060240323738,"score_gpt":0.240846735745405,"score_spread":0.21674467550508125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964796479","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9898612,0.0018957106,0.0027798594,0.00031530802,0.0017115257,0.00034464497,0.0000041145518,0.00028581868,0.0028018458],"genre_scores_gemma":[0.9841487,0.010500302,0.005128901,0.000009914792,0.00008447433,0.00008965723,0.000013317019,0.00001933842,0.000005420661],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99869525,0.0000722934,0.00050852145,0.00028089943,0.00017540855,0.00026763967],"domain_scores_gemma":[0.9995761,0.00008070182,0.00009218411,0.00013746695,0.000054641394,0.00005890922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001408387,0.0001959296,0.00020728732,0.0006076504,0.00009382509,0.000035425433,0.00004809917,0.0001512767,0.000035251393],"category_scores_gemma":[0.000059644186,0.00022196754,0.000030233321,0.00043637588,0.00018735562,0.00073463685,0.000014240405,0.0002727115,0.000010811949],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001994338,0.00003195562,0.14670958,0.0002701739,0.000019662037,0.0000037924246,0.0039027894,0.0024533453,0.00077333517,0.041604143,0.00006504247,0.80414623],"study_design_scores_gemma":[0.0049085873,0.0001319544,0.6423374,0.0011156779,0.00004458339,0.0026015097,0.008029502,0.28525215,0.0052733566,0.012696759,0.03596302,0.0016455014],"about_ca_topic_score_codex":0.00022704854,"about_ca_topic_score_gemma":0.0010309123,"teacher_disagreement_score":0.8025007,"about_ca_system_score_codex":0.00024901386,"about_ca_system_score_gemma":0.00005919209,"threshold_uncertainty_score":0.9051574},"labels":[],"label_agreement":null},{"id":"W1965637137","doi":"10.1016/j.aogh.2015.02.692","title":"Facility mapping: A tool for effective planning for MNCH services","year":2015,"lang":"en","type":"article","venue":"Annals of Global Health","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Process management; Business","score_opus":0.05604932489277715,"score_gpt":0.36107854561188846,"score_spread":0.3050292207191113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965637137","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75074536,0.0032644374,0.23891887,0.0013155289,0.001007823,0.0017258313,0.0014549777,0.00025556027,0.0013116082],"genre_scores_gemma":[0.99782914,0.000012439022,0.0016091276,0.00031433452,0.00007148428,0.0001069523,0.000045094133,0.000003982769,0.000007462264],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994164,0.000016797183,0.00020337003,0.00010006894,0.00007681031,0.00018653339],"domain_scores_gemma":[0.9995505,0.00003513646,0.00005393625,0.000080464946,0.0001992391,0.00008071308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031261204,0.00007890166,0.00016275239,0.000017845454,0.00004086608,0.000010987069,0.00005484932,0.00005285147,0.0000011705891],"category_scores_gemma":[0.000022221011,0.00007662199,0.00005715977,0.00008852199,0.000013409261,0.00009210992,0.0000055986434,0.000032718803,0.0000025257327],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054274604,0.000072944655,0.020967318,0.0042895046,0.00019200252,3.088556e-7,0.002867696,0.008055508,0.00008596125,0.01838686,0.076283544,0.8682556],"study_design_scores_gemma":[0.0057041235,0.0037137638,0.15985246,0.0010860327,0.00004140389,0.000035065423,0.008319795,0.13930963,0.005240622,0.09465456,0.5808897,0.0011528499],"about_ca_topic_score_codex":0.00011797999,"about_ca_topic_score_gemma":0.000050038456,"teacher_disagreement_score":0.86710274,"about_ca_system_score_codex":0.00006980797,"about_ca_system_score_gemma":0.000067742905,"threshold_uncertainty_score":0.31245542},"labels":[],"label_agreement":null},{"id":"W1967131639","doi":"10.1139/l08-023","title":"Soft computing approach to construction performance prediction and diagnosis","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"BP (Canada); Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Soft computing; Computer science; Task (project management); Field (mathematics); Fuzzy logic; Artificial neural network; Construction management; Fuzzy set; Set (abstract data type); Data mining; Machine learning; Measure (data warehouse); Artificial intelligence; Industrial engineering; Engineering; Systems engineering","score_opus":0.007179525981164324,"score_gpt":0.15119331130776298,"score_spread":0.14401378532659864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967131639","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.798538,0.0006489628,0.19684468,0.000023568406,0.0012454065,0.000064986685,0.0000058618457,0.000059541595,0.0025689772],"genre_scores_gemma":[0.9963524,0.000096916134,0.0032669748,0.000011971541,0.00024513487,0.0000029844462,0.0000012502658,0.000015913949,0.000006478729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999459,0.0000043297305,0.00022757715,0.00006305656,0.00008211739,0.00016386749],"domain_scores_gemma":[0.9995232,0.000014252643,0.00003055086,0.000051561623,0.00007351644,0.00030686837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000078228375,0.0000955171,0.000121655365,0.00033113558,0.00009552823,0.000030124846,0.00005457054,0.000055981465,0.00001634765],"category_scores_gemma":[0.000026538062,0.00010376811,0.000028884835,0.00018327958,0.000028609365,0.0002399114,0.0000028025677,0.00018852028,0.0000015406773],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020310615,0.000002438177,0.050406016,0.000073887095,0.000041106705,0.00000765366,0.00088890205,0.925763,0.0002745696,0.00039994446,0.0014636255,0.02067681],"study_design_scores_gemma":[0.0005010945,0.000113734066,0.12284931,0.00032491106,0.000038485352,0.006547722,0.00030185285,0.84565383,0.001360067,0.000025556075,0.021881878,0.0004015601],"about_ca_topic_score_codex":0.000049461578,"about_ca_topic_score_gemma":0.00059186725,"teacher_disagreement_score":0.19781436,"about_ca_system_score_codex":0.000111027904,"about_ca_system_score_gemma":0.00007450396,"threshold_uncertainty_score":0.42315406},"labels":[],"label_agreement":null},{"id":"W1967242003","doi":"10.1002/smr.420","title":"Introduction to the special issue on reverse engineering (WCRE 2008)","year":2009,"lang":"en","type":"article","venue":"Journal of Software Maintenance and Evolution Research and Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Computer science","score_opus":0.014672507453901643,"score_gpt":0.2791645647178339,"score_spread":0.26449205726393227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967242003","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10581858,0.010880183,0.28184777,0.573413,0.011800898,0.001459036,0.000034615317,0.0003435969,0.014402283],"genre_scores_gemma":[0.90568674,0.009712413,0.018849218,0.0016406373,0.060294148,0.000016976877,0.000003708655,0.00004510933,0.0037510558],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990882,0.00008953597,0.00020362335,0.00010026271,0.00031541244,0.00020292321],"domain_scores_gemma":[0.9988731,0.00034783233,0.000053144533,0.000099246165,0.0005101331,0.000116530464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001358554,0.00008141005,0.00010084073,0.00019960325,0.00016959668,0.000094329436,0.000073533694,0.00005536757,0.000055220138],"category_scores_gemma":[0.0030225813,0.000056858138,0.000024070376,0.00031496462,0.000042762917,0.000532841,0.000010650519,0.0005941956,0.00003206809],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007836149,0.000030000769,0.000082926854,0.000020472378,0.000030300673,0.00001681842,0.00035814286,0.0045037842,0.0005456659,0.0042619477,0.8696923,0.11967402],"study_design_scores_gemma":[0.00021887729,0.00058473635,0.0072429418,0.00007952619,0.000010346554,0.000730353,0.0010138532,0.0005364535,0.000103400096,0.0007072256,0.988695,0.000077268895],"about_ca_topic_score_codex":0.0000073056917,"about_ca_topic_score_gemma":0.0000052926453,"teacher_disagreement_score":0.79986817,"about_ca_system_score_codex":0.00011470566,"about_ca_system_score_gemma":0.000030539442,"threshold_uncertainty_score":0.36185306},"labels":[],"label_agreement":null},{"id":"W1967849422","doi":"10.1139/l01-032","title":"Integrating CAD and schedule for identification and resolution of work space conflicts between subcontractors","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Council","keywords":"Schedule; Computer science; Scheduling (production processes); Identification (biology); Space (punctuation); Critical path method; Conflict resolution; Operations research; CAD; Industrial engineering; Space exploration; Software; Systems engineering; Risk analysis (engineering); Engineering; Operations management; Engineering drawing","score_opus":0.010683989219165229,"score_gpt":0.1955786245529846,"score_spread":0.1848946353338194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967849422","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7890723,0.0022425521,0.2078656,0.00010867614,0.00039837166,0.00008760967,0.000009988219,0.000016627107,0.00019830583],"genre_scores_gemma":[0.9987902,0.00005747038,0.00097637624,0.0000021930307,0.00013754249,0.0000023324624,0.0000026286377,0.000014111586,0.000017142249],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99946314,0.000005663821,0.00028789285,0.000054718712,0.00005488682,0.0001336829],"domain_scores_gemma":[0.9995163,0.000057686215,0.000082633465,0.000049782702,0.00011421903,0.00017935815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019109444,0.00008252691,0.0001466221,0.0002485558,0.000039708888,0.000041178482,0.000042886102,0.00007221307,0.000006526188],"category_scores_gemma":[0.0001235188,0.00008725058,0.00003033465,0.0001366042,0.000026484591,0.00020039151,0.0000016571155,0.00014036744,1.4425675e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084666404,0.000016761407,0.39733267,0.0012464577,0.0008828109,0.000038077393,0.008901754,0.2655086,0.13486868,0.06303133,0.0022499138,0.12583828],"study_design_scores_gemma":[0.003238415,0.00036840077,0.5648545,0.0023742726,0.00045765706,0.0007595732,0.0022597,0.31541598,0.022569042,0.0019273371,0.08439428,0.0013808751],"about_ca_topic_score_codex":0.00014971079,"about_ca_topic_score_gemma":0.006740577,"teacher_disagreement_score":0.20971793,"about_ca_system_score_codex":0.00006570769,"about_ca_system_score_gemma":0.00004787448,"threshold_uncertainty_score":0.37614003},"labels":[],"label_agreement":null},{"id":"W1969294420","doi":"10.3141/2055-03","title":"Scheduling Work Zones for Highway Maintenance Projects","year":2008,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mitel (Canada)","funders":"","keywords":"Scheduling (production processes); Transport engineering; Computer science; Operations research; Highway maintenance; Work (physics); Work zone; Engineering; Operations management","score_opus":0.08732751387725741,"score_gpt":0.33015799548406854,"score_spread":0.24283048160681114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969294420","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96262854,0.00042511206,0.032846518,0.0013145945,0.0013072425,0.001088796,0.000044760916,0.0000932599,0.00025115843],"genre_scores_gemma":[0.98619854,0.0012728154,0.01102945,0.00002195639,0.00035161403,0.00019331044,0.000015194305,0.0000667757,0.00085035665],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.995585,0.0003085989,0.0011037603,0.00028103884,0.0019474389,0.0007741181],"domain_scores_gemma":[0.9952759,0.00062398356,0.00020354228,0.00032628325,0.0033231531,0.00024710206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019721836,0.00022701846,0.0003614314,0.0007871699,0.0007327444,0.000079725076,0.00065728894,0.00019921831,0.00010980376],"category_scores_gemma":[0.00014066795,0.00017173431,0.000375256,0.0019561122,0.0005415879,0.0006045329,0.0000025639483,0.0016352674,0.000017833812],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00797979,0.00076605007,0.5491259,0.0025359783,0.0012891679,0.00038598658,0.021944955,0.10087104,0.026168495,0.056763,0.13585106,0.096318595],"study_design_scores_gemma":[0.003554773,0.0007503723,0.9062799,0.001046219,0.00007412062,0.0000074926593,0.0035467646,0.0028940944,0.010075791,0.006824552,0.064383425,0.00056247035],"about_ca_topic_score_codex":0.00057437416,"about_ca_topic_score_gemma":0.004309644,"teacher_disagreement_score":0.35715404,"about_ca_system_score_codex":0.00022456411,"about_ca_system_score_gemma":0.0004173722,"threshold_uncertainty_score":0.71045136},"labels":[],"label_agreement":null},{"id":"W1970072403","doi":"10.4028/www.scientific.net/amr.1065-1069.1710","title":"Application of RFID Technology in Asphalt Pavement Construction","year":2014,"lang":"en","type":"article","venue":"Advanced materials research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Radio-frequency identification; Wireless; Productivity; Construction industry; Engineering; Construction engineering; Identification (biology); Asphalt; Manufacturing engineering; Transport engineering; Computer science; Telecommunications; Computer security","score_opus":0.012613686802639384,"score_gpt":0.2974581987252683,"score_spread":0.28484451192262894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970072403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9667847,0.00007748575,0.030957537,0.000109417524,0.0003281383,0.00028869242,0.000006580429,0.00011015855,0.001337301],"genre_scores_gemma":[0.9957285,0.00008984529,0.0039279587,0.0000024628227,0.000035618155,0.00018235747,0.0000099021645,0.000010614738,0.000012767701],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992493,0.000051014547,0.0002515829,0.00012317907,0.00015164498,0.00017332155],"domain_scores_gemma":[0.9996171,0.000031522497,0.000028852328,0.00018183411,0.000121588455,0.000019111894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037746583,0.000059975817,0.00012372546,0.00033615626,0.000028548864,0.000010238577,0.000090125715,0.00008841334,0.00006342532],"category_scores_gemma":[0.000042708816,0.000060855014,0.0000085195925,0.0003910904,0.00011451509,0.00008956071,0.000020057723,0.00010369579,0.000028743836],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000092374485,0.00000596331,0.00029222295,0.000048958613,0.0000024253357,8.575866e-8,0.000013525726,0.0007041503,0.7870869,0.07452419,0.0000068619856,0.13730548],"study_design_scores_gemma":[0.00025347774,0.00003966305,0.0005264115,0.000025431602,8.6663385e-7,0.0000033316007,0.00013051521,0.0012183281,0.96234334,0.032563075,0.002840896,0.000054689197],"about_ca_topic_score_codex":0.000023179251,"about_ca_topic_score_gemma":0.000017595365,"teacher_disagreement_score":0.17525642,"about_ca_system_score_codex":0.00006435177,"about_ca_system_score_gemma":0.000009958165,"threshold_uncertainty_score":0.24815954},"labels":[],"label_agreement":null},{"id":"W1971852361","doi":"10.1002/j.2168-9830.2002.tb00690.x","title":"A Seminar for Real‐time Interactive Simulation of Engineering Projects: An Innovative Use of Video‐conferencing and IT‐based Educational Tools","year":2002,"lang":"en","type":"article","venue":"Journal of Engineering Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Natural Sciences and Engineering Research Council of Canada; Polytechnique Montréal","funders":"","keywords":"Context (archaeology); Videoconferencing; Work (physics); Engineering management; Graduate students; Engineering education; Distance education; Teleconference; Engineering; Computer science; Multimedia; Pedagogy","score_opus":0.031607030841491,"score_gpt":0.2718655053756579,"score_spread":0.2402584745341669,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971852361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93192077,0.00008466404,0.0670184,0.00008475368,0.00057369564,0.00022434093,0.000016413529,0.000027193082,0.000049798007],"genre_scores_gemma":[0.9752645,0.000017304925,0.024443977,0.0000067405467,0.00017806605,0.00002108351,0.000016259592,0.000024827237,0.000027272508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910134,0.000015999887,0.000560601,0.00009011895,0.00013269206,0.000099249504],"domain_scores_gemma":[0.99812955,0.0005433888,0.00028738496,0.00009720676,0.0008914367,0.000051030507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001879693,0.0001369181,0.00022345397,0.00050616305,0.000018032333,0.000039709666,0.000061374485,0.00007798479,0.000024701521],"category_scores_gemma":[0.0006477247,0.00014318485,0.000050185958,0.00031056075,0.00001420936,0.0010377469,0.0000044378708,0.0001401598,3.373071e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057904374,0.00010149559,0.0002759324,0.00033477743,0.00007503735,9.170655e-8,0.0025340184,0.8152867,0.1728501,0.0004908203,0.00019063227,0.0078025074],"study_design_scores_gemma":[0.00028635628,0.00020038447,0.00573577,0.0005957266,0.00003490823,0.000015733614,0.00031950095,0.96944535,0.022717666,0.000022340508,0.00048287693,0.00014336011],"about_ca_topic_score_codex":0.000005591349,"about_ca_topic_score_gemma":6.3819755e-7,"teacher_disagreement_score":0.1541587,"about_ca_system_score_codex":0.00015098274,"about_ca_system_score_gemma":0.0001336125,"threshold_uncertainty_score":0.58389086},"labels":[],"label_agreement":null},{"id":"W1971857760","doi":"10.1260/1478-0771.9.2.187","title":"Aviva Stadium: A Case Study in Integrated Parametric Design","year":2011,"lang":"en","type":"article","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Stadium; Parametric statistics; Iterative design; Parametric design; Computer science; Process (computing); Conversation; Architectural engineering; Work (physics); Design process; Iterative and incremental development; Systems engineering; Operations research; Industrial engineering; Engineering; Work in process; Software engineering; Operations management; Sociology; Mechanical engineering; Mathematics","score_opus":0.040527974409425266,"score_gpt":0.26393502847159245,"score_spread":0.22340705406216718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971857760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8785904,0.00006387391,0.11968037,0.000013680968,0.0012150403,0.00009953296,0.0000010359859,0.00004006306,0.00029599355],"genre_scores_gemma":[0.98519886,0.000002687324,0.01461811,0.000013870843,0.00014797176,8.558337e-7,5.4835294e-7,0.00001255687,0.000004541297],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988356,0.00010638195,0.0005763663,0.000088903704,0.000255342,0.00013735764],"domain_scores_gemma":[0.99933827,0.00013897032,0.00014910083,0.00006260717,0.00025600693,0.000055070795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036506483,0.00012689801,0.00016729177,0.000790581,0.000025992154,0.000052299067,0.00026205424,0.000035450852,0.000045398036],"category_scores_gemma":[0.00007746875,0.00010436135,0.000071067574,0.00034407695,0.000025573081,0.0001488722,0.0000278649,0.00044787972,0.0000043398986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030950236,0.0002820463,0.06789824,0.0000116970905,0.0005259239,0.012049829,0.021259539,0.2577385,0.0008360164,0.0002296693,0.00007925401,0.63877976],"study_design_scores_gemma":[0.0056175427,0.0016475087,0.08323034,0.0004674026,0.000098629884,0.14948754,0.02342574,0.7244485,0.006632647,0.0038516773,0.00016666648,0.00092577696],"about_ca_topic_score_codex":0.00023863038,"about_ca_topic_score_gemma":0.00009227367,"teacher_disagreement_score":0.637854,"about_ca_system_score_codex":0.00014013865,"about_ca_system_score_gemma":0.000037263737,"threshold_uncertainty_score":0.42557326},"labels":[],"label_agreement":null},{"id":"W1975392223","doi":"10.1061/(asce)co.1943-7862.0000364","title":"Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visibility; Supply network; Dependency (UML); Work (physics); Computer science; Tracking (education); Supply chain; Field (mathematics); Risk analysis (engineering); Systems engineering; Business; Engineering; Artificial intelligence; Marketing","score_opus":0.006045387046516512,"score_gpt":0.18553003637183574,"score_spread":0.1794846493253192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975392223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.815094,0.00076801964,0.18199317,0.000012919797,0.0015250434,0.00012633926,0.0000034276575,0.00036114804,0.0001159124],"genre_scores_gemma":[0.9069264,0.00032363064,0.0926236,0.0000042995575,0.00009586804,0.000003711589,0.0000011498585,0.000019164774,0.0000022068186],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990337,0.000016182781,0.0005219809,0.00013365618,0.00010416363,0.0001903346],"domain_scores_gemma":[0.9995511,0.000011475846,0.00019527425,0.00009008681,0.00008928617,0.0000627692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025735275,0.00016621643,0.0002339465,0.00028975782,0.00008812802,0.00006740406,0.000055338023,0.00011090955,0.000017522425],"category_scores_gemma":[0.000013613602,0.0001695496,0.000028220862,0.00022436862,0.00009390858,0.0003452783,0.000025486832,0.00016759316,3.0812865e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000734638,0.000030628056,0.008263956,0.0012378156,0.0006910736,0.000031640233,0.00040202064,0.038228747,0.16696166,0.026567254,0.00023883865,0.7572729],"study_design_scores_gemma":[0.0034991968,0.00035828748,0.010244515,0.0017289934,0.0008629093,0.013286196,0.005371437,0.8281143,0.12925902,0.003495417,0.0021831738,0.0015965876],"about_ca_topic_score_codex":0.000008784401,"about_ca_topic_score_gemma":6.9465534e-7,"teacher_disagreement_score":0.7898855,"about_ca_system_score_codex":0.00006714213,"about_ca_system_score_gemma":0.000008601384,"threshold_uncertainty_score":0.6914032},"labels":[],"label_agreement":null},{"id":"W1976484689","doi":"10.1139/l09-178","title":"An implementation model for automated construction materials tracking and locating","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Key (lock); Computer science; Automation; Emerging technologies; Productivity; Supply chain; Materials management; Oil refinery; Systems engineering; Engineering; Construction engineering; Manufacturing engineering; Operations management; Computer security; Business","score_opus":0.008080954407434839,"score_gpt":0.2245471597042594,"score_spread":0.21646620529682456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976484689","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73714954,0.000052589112,0.26126176,0.00001981449,0.0012714675,0.000081344675,0.00002525438,0.00009769291,0.00004053886],"genre_scores_gemma":[0.98571765,0.0000039027277,0.014047489,0.0000063206703,0.00018783253,0.0000053915264,0.000007898827,0.000022529697,9.914213e-7],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994676,0.0000039069364,0.0002724788,0.000055317832,0.00004726078,0.00015340986],"domain_scores_gemma":[0.9995662,0.000013089622,0.00005908476,0.00005339472,0.00011675181,0.00019149996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017042915,0.00008815263,0.00010975894,0.0002232313,0.00006264689,0.00011106984,0.00005187656,0.00006712602,0.00004781597],"category_scores_gemma":[0.000023444985,0.000097422846,0.000021287944,0.000061261504,0.000017790177,0.0004109185,9.055539e-7,0.00012462899,2.0766821e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026188254,0.000001110798,0.00042131086,0.00007422607,0.000031873446,0.0000019292488,0.0006786689,0.47728375,0.49082327,0.004654181,0.00014875113,0.02587832],"study_design_scores_gemma":[0.0002443571,0.000019970386,0.0009269226,0.000030175082,0.000018555871,0.00023854783,0.00021487576,0.97952676,0.018245384,0.00021137997,0.00020762846,0.00011541798],"about_ca_topic_score_codex":0.000089380286,"about_ca_topic_score_gemma":0.03406188,"teacher_disagreement_score":0.50224304,"about_ca_system_score_codex":0.00004681642,"about_ca_system_score_gemma":0.00011512083,"threshold_uncertainty_score":0.98356396},"labels":[],"label_agreement":null},{"id":"W1977024736","doi":"10.1016/j.autcon.2015.03.004","title":"Automated generation of shop drawings in residential construction","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council","funders":"","keywords":"Visual Basic for Applications; CAD; Building information modeling; Computer Aided Design; Parametric statistics; Engineering drawing; Automation; Process (computing); Engineering; Parametric design; Technical drawing; Information model; Parametric model; Construction engineering; Manufacturing engineering; Computer science; Software engineering; Mechanical engineering; Operations management; Scheduling (production processes)","score_opus":0.020475940774067464,"score_gpt":0.24243523356336164,"score_spread":0.22195929278929416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977024736","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98124474,0.00008489379,0.011831699,0.00007870833,0.0026983798,0.00026163386,0.0000064528454,0.00083920266,0.0029542705],"genre_scores_gemma":[0.9900916,0.000025017194,0.009610399,0.00000702256,0.00013146145,0.000041929954,0.000063388026,0.000018894085,0.000010284602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984407,0.00009637573,0.00079670537,0.0002068447,0.00028125252,0.00017813899],"domain_scores_gemma":[0.99941146,0.000026063202,0.00015519501,0.00016748463,0.00018350707,0.00005627796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000329867,0.00016342064,0.00022902986,0.000777172,0.000033360233,0.000047458583,0.000075181284,0.00021977125,0.000056137957],"category_scores_gemma":[0.00008558466,0.00019344772,0.0000422997,0.00085046806,0.00013622585,0.00081494724,0.000011267149,0.00018106322,0.000019873662],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001388345,0.000120144476,0.14081626,0.00028689677,0.000091950875,0.000013152943,0.0044419123,0.3451331,0.114661686,0.097418815,0.004912495,0.29196474],"study_design_scores_gemma":[0.0014338634,0.00003560736,0.017007364,0.00009438002,0.000013642285,0.00015380786,0.0013682215,0.946843,0.029266778,0.0033202998,0.00021077569,0.00025225774],"about_ca_topic_score_codex":0.00015836934,"about_ca_topic_score_gemma":0.00035996735,"teacher_disagreement_score":0.6017099,"about_ca_system_score_codex":0.00032816618,"about_ca_system_score_gemma":0.00010682489,"threshold_uncertainty_score":0.78885686},"labels":[],"label_agreement":null},{"id":"W1977137067","doi":"10.1061/(asce)co.1943-7862.0000705","title":"Hands-On Exercise for Enhancing Students’ Construction Management Skills","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Schedule; Project management; Procurement; Computer science; Construction management; Interdependence; Engineering management; Project planning; Project management triangle; Knowledge management; Engineering; Systems engineering","score_opus":0.0026592082836023436,"score_gpt":0.18874731535874578,"score_spread":0.18608810707514345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977137067","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.517363,0.00040599843,0.4731996,0.00010036934,0.0051379614,0.0010780252,0.0000037791756,0.0002593241,0.0024519272],"genre_scores_gemma":[0.9352449,0.0029026724,0.061098535,0.000027451122,0.00027501135,0.00014470468,0.0000032676526,0.000041840383,0.00026163016],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989326,0.0000069233697,0.0004848598,0.0001331369,0.0002512086,0.00019127165],"domain_scores_gemma":[0.9995324,0.000024048508,0.00011910497,0.00011595159,0.00011125702,0.00009720867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015735433,0.00019082939,0.0002281459,0.00045391158,0.00007335191,0.00013515727,0.00010237054,0.00006473383,0.000037411908],"category_scores_gemma":[0.000005090436,0.0001814467,0.000093270224,0.00014669583,0.00003598377,0.00030251357,0.000019664369,0.00013763574,0.000008149754],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044952274,0.00005998216,0.0004414692,0.000996045,0.00073003257,0.00001040671,0.00015268048,0.0537428,0.0011661958,0.043302074,0.0023759706,0.89697737],"study_design_scores_gemma":[0.06660408,0.0045584403,0.107502684,0.021049285,0.0066763638,0.0087099895,0.03129341,0.2655733,0.11627959,0.039750554,0.32233313,0.009669186],"about_ca_topic_score_codex":7.720109e-7,"about_ca_topic_score_gemma":4.554251e-7,"teacher_disagreement_score":0.8873082,"about_ca_system_score_codex":0.00008346592,"about_ca_system_score_gemma":0.0000036612955,"threshold_uncertainty_score":0.7399182},"labels":[],"label_agreement":null},{"id":"W1977950491","doi":"10.1061/(asce)co.1943-7862.0000220","title":"Role of Simulation in Construction Engineering and Management","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":356,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software deployment; Key (lock); Computer science; Construction management; Systems engineering; Construction industry; Management science; Engineering management; Construction engineering; Engineering; Software engineering; Civil engineering; Computer security","score_opus":0.002317563432346137,"score_gpt":0.17324124150140063,"score_spread":0.1709236780690545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977950491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9255614,0.00045793285,0.071082056,0.00002539418,0.0015950131,0.00019497848,0.0000021374099,0.00007812517,0.0010029451],"genre_scores_gemma":[0.96260834,0.00096545886,0.036312077,0.0000024836759,0.00008081578,0.000006255372,9.232407e-7,0.000015613852,0.000008038811],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991412,0.0000062111267,0.00047028853,0.00010144694,0.00015368842,0.0001271621],"domain_scores_gemma":[0.9996578,0.000023866567,0.00010942488,0.000090520734,0.000056453813,0.000061923216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017139739,0.00014364076,0.00019925337,0.0006218985,0.000021670587,0.000032243104,0.00005161104,0.00007792178,0.000011264929],"category_scores_gemma":[0.000009119068,0.00015170312,0.000040858868,0.00020716459,0.00004302899,0.00026042256,0.000019700017,0.00023903263,4.121111e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020243086,0.000013524577,0.0012950107,0.0005254542,0.00016525191,0.000009167885,0.00012300968,0.6797855,0.016943797,0.06382434,0.0000100635225,0.23728465],"study_design_scores_gemma":[0.0019459593,0.0000783594,0.03782704,0.00047982394,0.00017610051,0.0010189185,0.0011925874,0.93207574,0.0044398154,0.001184846,0.019127553,0.00045324548],"about_ca_topic_score_codex":0.0000019062535,"about_ca_topic_score_gemma":0.000002793049,"teacher_disagreement_score":0.25229025,"about_ca_system_score_codex":0.00003195036,"about_ca_system_score_gemma":0.000003973016,"threshold_uncertainty_score":0.61862737},"labels":[],"label_agreement":null},{"id":"W1978216279","doi":"10.1061/9780784413586.084","title":"Key Components for the Effective Management of Airport Assets","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Asset management; Best practice; Business; Process (computing); Key (lock); Asset (computer security); Engineering management; Process management; International airport; Computer science; Engineering; Transport engineering; Finance; Computer security; Management; Economics","score_opus":0.0068172728147281895,"score_gpt":0.20465657036246085,"score_spread":0.19783929754773266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978216279","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07983103,0.00003168325,0.86116046,0.00006388498,0.0006166464,0.0004177365,0.0000023448026,0.000095147836,0.057781097],"genre_scores_gemma":[0.9980595,0.0000056302883,0.0016074203,0.0000107450105,0.000019797277,0.00006611709,0.0000028086417,0.000004165912,0.00022381486],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981487,0.000004200229,0.00006284237,0.000035081674,0.00004201097,0.000040975243],"domain_scores_gemma":[0.99985576,0.000037926486,0.000010026939,0.000071530616,0.000017227067,0.000007542845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006524147,0.000034169858,0.000040996394,0.000012234521,0.000019980536,0.0000046166615,0.000037693382,0.00001444318,0.000022878896],"category_scores_gemma":[0.0000013055667,0.000021906786,0.000025547733,0.000024562421,0.000009947179,0.000021682376,0.000004492946,0.000019244884,0.0000071473046],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017827411,0.00001978054,0.0021023573,0.00021667748,0.00032700185,1.355242e-7,0.000092207214,0.0055569396,0.0030672143,0.4084527,0.0071022287,0.57304496],"study_design_scores_gemma":[0.0014382704,0.00011448925,0.28097272,0.000085675776,0.00014501423,0.0000055152464,0.00033887336,0.5214746,0.047502983,0.007957871,0.13969664,0.0002673415],"about_ca_topic_score_codex":0.000005762258,"about_ca_topic_score_gemma":0.0000040782575,"teacher_disagreement_score":0.91822845,"about_ca_system_score_codex":0.000007848418,"about_ca_system_score_gemma":4.3887238e-7,"threshold_uncertainty_score":0.08933328},"labels":[],"label_agreement":null},{"id":"W1978709380","doi":"10.1061/(asce)co.1943-7862.0000959","title":"Setting Baseline Rates for On-Site Work Categories in the Construction Industry","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Baseline (sea); Flexibility (engineering); Work (physics); Computer science; Installation; Inference; Construction industry; Industrial engineering; Operations research; Engineering; Construction engineering; Artificial intelligence; Statistics; Mathematics","score_opus":0.00493514479746501,"score_gpt":0.2023066663861754,"score_spread":0.19737152158871038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978709380","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48793662,0.0003132824,0.5054624,0.0009632444,0.0034904673,0.00033780967,0.000004627908,0.0001081094,0.0013834332],"genre_scores_gemma":[0.9815793,0.00016434169,0.017792976,0.00005424964,0.00035499345,0.000020393116,0.0000027791023,0.000013698533,0.000017254626],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992982,0.000027060325,0.0003443597,0.00007942293,0.00012547644,0.00012545753],"domain_scores_gemma":[0.9996263,0.00011274533,0.00008958375,0.00008101993,0.00005672936,0.000033659824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054676656,0.000121788486,0.0001401371,0.00026593372,0.000056050772,0.0000673198,0.000062099854,0.00008631413,0.0000054312623],"category_scores_gemma":[0.000036312533,0.000095689895,0.000046431105,0.00020926974,0.00003810212,0.00013935925,0.000005820474,0.0003112068,7.7646246e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007558998,0.000020290685,0.0047767,0.00035246776,0.00016718496,0.0000060814446,0.00045103757,0.33560082,0.0003092054,0.1497477,0.0018987588,0.5065942],"study_design_scores_gemma":[0.008519361,0.000739821,0.052520633,0.0022324927,0.00058619585,0.0031965037,0.013907163,0.45790607,0.005378366,0.010811983,0.44245875,0.0017426646],"about_ca_topic_score_codex":8.522172e-7,"about_ca_topic_score_gemma":0.0000011052472,"teacher_disagreement_score":0.5048515,"about_ca_system_score_codex":0.000036091024,"about_ca_system_score_gemma":0.000005370907,"threshold_uncertainty_score":0.39021206},"labels":[],"label_agreement":null},{"id":"W1978951516","doi":"10.2749/222137908796294153","title":"Offsite/Accelerated Construction of a Busy Interchange Bridge","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Schedule; Transport engineering; Modular design; Engineering; Quarter (Canadian coin); Civil engineering; Computer science; Geography","score_opus":0.03619922417992151,"score_gpt":0.21605945711087582,"score_spread":0.17986023293095432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978951516","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94296926,0.00006297269,0.029132992,0.000024708315,0.00047016164,0.0000582656,0.000005644999,0.0002504161,0.027025575],"genre_scores_gemma":[0.9979242,0.0000695748,0.0017097184,0.000014762645,0.000049198858,0.0000059613976,0.000008413871,0.000008208358,0.00020994677],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99963236,0.000007156937,0.00015821554,0.00006381786,0.00006429483,0.00007413405],"domain_scores_gemma":[0.9997995,0.0000071138056,0.000018885861,0.00007986795,0.00006949062,0.000025142059],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00001935751,0.000066313376,0.00009047808,0.000087114844,0.000025183452,0.000004793939,0.000037365106,0.000052981686,0.0004006699],"category_scores_gemma":[0.0000039006195,0.00006252041,0.000031944124,0.00016726564,0.00006549523,0.00010921536,0.0000051861407,0.00006658291,0.000029552151],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009984855,0.00010317754,0.05800053,0.00025477423,0.00032929538,0.000018810248,0.0037992396,0.00084564486,0.21471642,0.123062484,0.034792665,0.5639771],"study_design_scores_gemma":[0.0018772867,0.00019190102,0.13236135,0.00011804238,0.000047780304,0.0018305643,0.0014392955,0.05867691,0.78854805,0.0018067257,0.012249143,0.0008529183],"about_ca_topic_score_codex":0.00007099828,"about_ca_topic_score_gemma":0.000037334157,"teacher_disagreement_score":0.5738317,"about_ca_system_score_codex":0.000021045837,"about_ca_system_score_gemma":0.00000943903,"threshold_uncertainty_score":0.43870544},"labels":[],"label_agreement":null},{"id":"W1979530329","doi":"10.1139/l11-005","title":"Lean construction implementation and its implication on sustainability: a contractor’s case study","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Lean construction; Lean project management; Sustainability; Lean manufacturing; Construction industry; Lean laboratory; Construction management; Scheduling (production processes); Process management; Work (physics); Lean software development; Manufacturing engineering; Engineering; Operations management; Computer science; Construction engineering; Civil engineering","score_opus":0.012551596372692648,"score_gpt":0.22360704831333603,"score_spread":0.21105545194064337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979530329","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99506736,0.00019312547,0.0035755984,0.000019364796,0.0005225944,0.00020669562,0.000005960238,0.000033086217,0.00037620176],"genre_scores_gemma":[0.9997996,0.000007848856,0.00007539338,0.000005518546,0.00008271547,0.000008863793,9.607006e-7,0.000016700542,0.0000023747857],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99937975,0.000010208181,0.00029911773,0.000077933895,0.000070545495,0.00016244577],"domain_scores_gemma":[0.9994028,0.000016449721,0.00006351164,0.00007657075,0.00020136885,0.00023927948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001553781,0.000110590154,0.0001236677,0.0003382295,0.00006224785,0.00003431526,0.00004470243,0.00004747525,0.00010679986],"category_scores_gemma":[0.000033363478,0.00011634093,0.000030710427,0.00012489493,0.000014496458,0.00026224862,0.0000019777167,0.00018068221,9.158669e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000120184246,0.00017710656,0.15427355,0.00073890405,0.0014066907,0.0068841963,0.060447585,0.05721767,0.007451462,0.12335703,0.0013012738,0.5866243],"study_design_scores_gemma":[0.0147683,0.0059345327,0.3049244,0.0006021886,0.0012689093,0.14821485,0.37816906,0.08585797,0.03159115,0.00953836,0.014692044,0.0044382233],"about_ca_topic_score_codex":0.001023043,"about_ca_topic_score_gemma":0.056243286,"teacher_disagreement_score":0.5821861,"about_ca_system_score_codex":0.0002650703,"about_ca_system_score_gemma":0.00014078231,"threshold_uncertainty_score":0.9609778},"labels":[],"label_agreement":null},{"id":"W1979573995","doi":"10.1108/14714171011060088","title":"Analysis of labour productivity of formwork operations in building construction","year":2010,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Crew; Originality; Formwork; Work (physics); Procurement; Engineering; Civil engineering; Business; Economics; Mechanical engineering; Qualitative research; Marketing; Economic growth","score_opus":0.007299542001483548,"score_gpt":0.23010995295389394,"score_spread":0.2228104109524104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979573995","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93206173,0.000012174498,0.06511374,0.00004058193,0.0015759573,0.00017126747,0.000035496112,0.00009108264,0.00089798943],"genre_scores_gemma":[0.9712798,0.000008054203,0.028529195,0.0000041950307,0.00008085768,0.000026370812,0.00004605172,0.000011159018,0.000014319088],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9986938,0.000024837289,0.0007932803,0.00018681622,0.00017606418,0.00012520025],"domain_scores_gemma":[0.9989188,0.000027648193,0.00017600427,0.0002446026,0.0006145009,0.000018465593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030359524,0.00013032166,0.0002906639,0.0018675615,0.000057081317,0.00002067411,0.00007805661,0.00016562924,0.00017687763],"category_scores_gemma":[0.0001297251,0.00014536017,0.00006399531,0.006509086,0.00023430506,0.0005103114,0.00001072488,0.00029815224,0.0000010384654],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008116944,0.000016881011,0.090556964,0.000039966068,0.00012172903,7.016205e-8,0.00008914059,0.017633025,0.39412773,0.44122937,0.0000045992547,0.05617241],"study_design_scores_gemma":[0.0008553483,0.000044512788,0.47333166,0.00006543364,0.00028360254,0.000059900245,0.0010633541,0.070637636,0.44252598,0.009752894,0.00095144374,0.00042822867],"about_ca_topic_score_codex":0.00006285878,"about_ca_topic_score_gemma":0.00043681252,"teacher_disagreement_score":0.43147647,"about_ca_system_score_codex":0.000049383332,"about_ca_system_score_gemma":0.000058866663,"threshold_uncertainty_score":0.5927616},"labels":[],"label_agreement":null},{"id":"W1981172092","doi":"10.1061/(asce)cp.1943-5487.0000123","title":"Near Real-Time Motion Planning and Simulation of Cranes in Construction: Framework and System Architecture","year":2012,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Planner; Motion planning; Motion (physics); Engineering; Automation; Architecture; Systems engineering; Computer science; Simulation; Artificial intelligence; Robot","score_opus":0.005447623349515008,"score_gpt":0.209963585215207,"score_spread":0.204515961865692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981172092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79510486,0.0006046333,0.20380642,0.0000043969712,0.00031362672,0.00003426723,3.3844532e-7,0.000030379852,0.00010106666],"genre_scores_gemma":[0.9831844,0.00001413548,0.01662899,7.4910116e-7,0.00015951507,2.9425775e-7,3.0163656e-7,0.000011365851,2.6782803e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993174,0.000019596297,0.00039826182,0.000048181835,0.0000975389,0.00011902851],"domain_scores_gemma":[0.99959767,0.00018189702,0.00010548288,0.00004123427,0.000032571235,0.0000411205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029497928,0.0000912393,0.00020486044,0.00025337978,0.000018729383,0.00002136567,0.00002872397,0.00009079056,0.000001968234],"category_scores_gemma":[0.000045677956,0.000092414964,0.000021230073,0.00017211509,0.00001942782,0.00016026158,0.000008792958,0.0002749491,1.2768591e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058830933,0.0000031371617,0.034791008,0.00020611305,0.000010171378,0.0000017511356,0.0012202745,0.95804113,0.0012638795,0.00034932268,4.8941155e-7,0.004106846],"study_design_scores_gemma":[0.00021033722,0.000014861609,0.078393325,0.0011802263,0.000007827034,0.0002623072,0.00022293295,0.9194007,0.00016962102,0.000046533085,0.000014929188,0.00007639644],"about_ca_topic_score_codex":0.0000033758765,"about_ca_topic_score_gemma":0.0000010222594,"teacher_disagreement_score":0.1880795,"about_ca_system_score_codex":0.000052515687,"about_ca_system_score_gemma":0.000006011066,"threshold_uncertainty_score":0.37685728},"labels":[],"label_agreement":null},{"id":"W1981921521","doi":"10.1061/40754(183)131","title":"Situation Based Modeling for Construction Productivity","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Industry Canada","keywords":"Productivity; Construction industry; Computer science; Construction management; Risk analysis (engineering); Engineering; Construction engineering; Business; Civil engineering; Economics","score_opus":0.014046059575211212,"score_gpt":0.21066634935449757,"score_spread":0.19662028977928636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981921521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098343365,0.000017302222,0.89715445,0.00027146982,0.00031832617,0.00015911926,0.0000024078392,0.0003366981,0.0033968366],"genre_scores_gemma":[0.91790015,0.0000012989866,0.0816919,0.00002138178,0.00025355202,0.000045230445,0.000012388031,0.000008215658,0.000065916705],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996799,0.000004153983,0.00010300644,0.000087277185,0.0000516033,0.000074064774],"domain_scores_gemma":[0.9998269,0.000008903451,0.000009561862,0.0000709307,0.00006609383,0.000017630586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000060887578,0.000057072146,0.000047869646,0.000050030838,0.0000466628,0.00001862142,0.000019923873,0.00004125831,0.00006414496],"category_scores_gemma":[0.000011475054,0.00005615765,0.000022846498,0.000059392307,0.000010228783,0.00021795182,0.000001135751,0.00003835786,0.000011946533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005337814,0.000005110159,0.000029573897,0.000012892441,0.000004460158,6.329713e-9,0.000021179809,0.61447906,0.012804042,0.009247823,0.00020954854,0.36318094],"study_design_scores_gemma":[0.00015450039,0.0000070305828,0.00001223675,0.0000028364525,0.0000055730206,0.0000023341754,0.000029500325,0.9329084,0.06264747,0.00094997324,0.0032125975,0.00006755725],"about_ca_topic_score_codex":0.0000029019216,"about_ca_topic_score_gemma":0.00003790658,"teacher_disagreement_score":0.8195568,"about_ca_system_score_codex":0.000046310764,"about_ca_system_score_gemma":0.0000120239265,"threshold_uncertainty_score":0.22900425},"labels":[],"label_agreement":null},{"id":"W1982161115","doi":"10.1061/(asce)0733-9364(2000)126:2(137)","title":"Project Performance Control in Reconstruction Projects","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Control (management); Quality (philosophy); Earned value management; Process management; Performance indicator; Engineering; Project planning; Construction engineering; Engineering management; Computer science; Project management; Transport engineering; Operations management; Systems engineering; Business; Project charter; Artificial intelligence; Marketing","score_opus":0.004215611017472729,"score_gpt":0.17087970827404322,"score_spread":0.1666640972565705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982161115","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9847239,0.00036923285,0.008890842,0.00003894941,0.0010736841,0.0002064854,0.0000011974943,0.00009174133,0.0046039526],"genre_scores_gemma":[0.990295,0.0028171903,0.006674134,0.000010369212,0.000106409054,0.000012873856,4.2199602e-7,0.000012130127,0.000071472765],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993058,0.000010800355,0.000363235,0.000077697456,0.000114344766,0.00012816439],"domain_scores_gemma":[0.99981034,0.000008935283,0.000051040694,0.0000612316,0.00003494912,0.000033524717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014690029,0.00011315356,0.00015849828,0.0004045289,0.000024954075,0.00003178311,0.000044909186,0.000050623483,0.000040920306],"category_scores_gemma":[0.0000028020058,0.00010791676,0.000036276968,0.00022284567,0.000028347777,0.0003312814,0.0000028033314,0.00017280939,0.000002405817],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004255387,0.00000912807,0.0016664389,0.00019961955,0.00008285904,0.0000101710275,0.00009675046,0.0799426,0.00045503504,0.0011953705,0.0001416162,0.91615784],"study_design_scores_gemma":[0.007564518,0.00041450796,0.038235795,0.0015222348,0.00022130788,0.011063516,0.0014190938,0.8325909,0.002179385,0.00030373965,0.10350875,0.0009762888],"about_ca_topic_score_codex":0.000001869921,"about_ca_topic_score_gemma":0.0000011703366,"teacher_disagreement_score":0.9151816,"about_ca_system_score_codex":0.000063935775,"about_ca_system_score_gemma":0.00001086608,"threshold_uncertainty_score":0.4400718},"labels":[],"label_agreement":null},{"id":"W1984686034","doi":"10.1007/bf02483137","title":"Optimization of ternary cementitious mortar blends using factorial experimental plans","year":2002,"lang":"en","type":"article","venue":"Materials and Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mortar; Cementitious; Materials science; Factorial experiment; Ternary operation; Solid mechanics; Composite material; Cement; Mathematics; Computer science; Statistics","score_opus":0.013262008324287136,"score_gpt":0.21045959812394788,"score_spread":0.19719758979966073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984686034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9942748,0.0001907953,0.0031716356,0.0000013211607,0.0017180642,0.00005017236,0.000087347275,0.000043305758,0.00046257454],"genre_scores_gemma":[0.9984147,0.000039187267,0.0012806623,0.0000036656515,0.00022310342,0.000002413884,0.000018074154,0.0000092208475,0.000008993687],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996445,0.000008858252,0.00014984196,0.00006689799,0.00006280039,0.00006710144],"domain_scores_gemma":[0.99989086,0.0000023568705,0.0000288592,0.000049947063,0.000010288663,0.00001768005],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000011541036,0.00007806563,0.00009896358,0.0000380142,0.00004003887,0.00003853096,0.000026650343,0.000049439586,0.0015261577],"category_scores_gemma":[0.0000010222359,0.0000698928,0.0000126286795,0.000021118289,0.000023701778,0.00008514134,0.0000070482647,0.000019227213,4.4506203e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011223993,0.000004395406,0.00013434954,0.00003405769,0.00002759408,0.0000010683041,0.00051939057,0.03590445,0.96115184,0.0017122532,0.00009262953,0.00040673176],"study_design_scores_gemma":[0.00032523274,0.000035515553,0.00023782019,0.000012676442,0.000016691469,0.000024298757,0.00017017119,0.033335656,0.965207,0.0003409831,0.00016200895,0.00013198437],"about_ca_topic_score_codex":0.000036119185,"about_ca_topic_score_gemma":0.0000018586674,"teacher_disagreement_score":0.004139895,"about_ca_system_score_codex":0.000010966543,"about_ca_system_score_gemma":0.0000015401156,"threshold_uncertainty_score":0.9993866},"labels":[],"label_agreement":null},{"id":"W1985282346","doi":"10.5555/1030818.1031026","title":"Construction engineering and project management II: an application of lean concepts and simulation for drainage operations maintenance crews","year":2003,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Drainage; Engineering; Crew; Productivity; Maintenance engineering; Work (physics); Lean construction; Construction engineering; Reliability engineering; Construction industry","score_opus":0.01680683118234449,"score_gpt":0.2695450519253714,"score_spread":0.25273822074302693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985282346","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17012592,0.00004000511,0.8279809,0.000010641759,0.00014183622,0.0007188517,0.000014452402,0.00010629895,0.0008611093],"genre_scores_gemma":[0.9798032,0.00001125853,0.01991784,0.000012139296,0.00002807763,0.000114335424,0.00003179657,0.000016649316,0.00006468335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992435,0.000018454652,0.00030932264,0.00022541081,0.00008244469,0.00012087659],"domain_scores_gemma":[0.999525,0.00005419114,0.000052732932,0.0001465428,0.00018208916,0.00003942102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011272725,0.0001448109,0.00014110483,0.00013477191,0.00010889686,0.00005375301,0.0000439879,0.00007429044,0.000014124016],"category_scores_gemma":[0.00003494342,0.00015369647,0.000024959883,0.00011563579,0.000067859895,0.00040838256,0.000011141359,0.00006549054,4.963452e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017935006,0.0000107280175,0.00018825987,0.00009711688,0.000022863383,9.1359496e-8,0.0006653664,0.78540945,0.0023496356,0.17952919,0.0000046445407,0.031704728],"study_design_scores_gemma":[0.0007159323,0.00006393418,0.0005713633,0.000042171643,0.000024560444,0.000004991986,0.0004700391,0.99288976,0.0010914133,0.0014672207,0.0025014791,0.00015714973],"about_ca_topic_score_codex":0.000006724321,"about_ca_topic_score_gemma":0.000022195303,"teacher_disagreement_score":0.8096773,"about_ca_system_score_codex":0.00003228729,"about_ca_system_score_gemma":0.000011738378,"threshold_uncertainty_score":0.626756},"labels":[],"label_agreement":null},{"id":"W1986507000","doi":"10.1139/l10-007","title":"A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Korea Institute of Construction Technology","keywords":"Duration (music); Case-based reasoning; Genetic algorithm; Process (computing); Project management; Project planning; Computer science; Artificial neural network; Operations research; Engineering; Machine learning; Systems engineering","score_opus":0.016598489944070382,"score_gpt":0.20555184988719563,"score_spread":0.18895335994312526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986507000","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4581677,0.000023746466,0.5404377,0.000028858663,0.0008645644,0.0003130413,0.000044946584,0.00003938521,0.00008004823],"genre_scores_gemma":[0.9826192,0.0000027768037,0.017148254,0.000025915633,0.00012616906,0.000030481755,0.0000104673145,0.000034843706,0.000001873519],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991523,0.000008041681,0.00041818895,0.00010339372,0.000091971546,0.0002260806],"domain_scores_gemma":[0.9994767,0.000051130777,0.000109110115,0.00007812493,0.00013046044,0.00015453214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024392885,0.00015084924,0.00018161761,0.000688897,0.00006479018,0.000087683016,0.00005608404,0.0000900188,0.0000027418025],"category_scores_gemma":[0.00022189005,0.000164316,0.000045344656,0.00014805494,0.000028414697,0.00019835796,0.0000013377286,0.0004020896,1.3894473e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032563134,0.0000083756395,0.006588194,0.00020312119,0.000017239088,0.000018243829,0.0003205619,0.9633319,0.017288826,0.0002643583,0.00004325505,0.011883363],"study_design_scores_gemma":[0.0008250568,0.000040397084,0.0021637764,0.00024946197,0.000015235748,0.000059505066,0.000059285794,0.9952243,0.0009516454,0.00001055727,0.00025004125,0.00015072807],"about_ca_topic_score_codex":0.00010580446,"about_ca_topic_score_gemma":0.025533192,"teacher_disagreement_score":0.5244515,"about_ca_system_score_codex":0.00016715459,"about_ca_system_score_gemma":0.0005985793,"threshold_uncertainty_score":0.9922483},"labels":[],"label_agreement":null},{"id":"W1986519255","doi":"10.1108/02632770010315733","title":"Accommodating future business intelligence: new work‐space and work‐time challenges for management and design","year":2000,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Agile software development; Facility management; Work (physics); Space (punctuation); Knowledge management; Process management; Engineering management; Business intelligence; Duration (music); Quality (philosophy); Computer science; Engineering; Business; Marketing","score_opus":0.023454132478267456,"score_gpt":0.20261664009764066,"score_spread":0.1791625076193732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986519255","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2523963,0.092695005,0.60161835,0.0058424845,0.0016878046,0.0023009162,0.000084164094,0.0017147382,0.041660257],"genre_scores_gemma":[0.73204243,0.033500228,0.11045446,0.00010089981,0.001341685,0.0003984274,0.00005240785,0.00009925154,0.12201019],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995785,0.000010246683,0.00010516474,0.00012363437,0.000054266988,0.00012820045],"domain_scores_gemma":[0.9998047,0.00004293003,0.000009463196,0.00008540599,0.000020594136,0.00003693738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005565395,0.000114068906,0.000100375684,0.000042950956,0.000067328656,0.00006518983,0.000043648684,0.00006170335,0.00022807594],"category_scores_gemma":[0.0000036759059,0.000107353575,0.000013815758,0.000089269764,0.000033044387,0.0001409201,0.0000097541315,0.00005647639,0.000014716939],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025555124,0.0000021229848,0.0000616288,0.00013509134,0.000027357632,3.196083e-7,0.0017431803,0.0025344207,0.0000050210924,0.0029732473,0.0021529326,0.9903391],"study_design_scores_gemma":[0.0010706325,0.00011827448,0.015639408,0.00073344103,0.00011719329,0.00004202873,0.034346096,0.021247055,0.0010964612,0.029341597,0.8947659,0.0014818888],"about_ca_topic_score_codex":0.000005517138,"about_ca_topic_score_gemma":0.000003368419,"teacher_disagreement_score":0.9888572,"about_ca_system_score_codex":0.000013744047,"about_ca_system_score_gemma":0.000004448198,"threshold_uncertainty_score":0.43777516},"labels":[],"label_agreement":null},{"id":"W1986999660","doi":"10.1139/l06-073","title":"A hybrid approach for developing special purpose simulation tools","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Simulation modeling; Key (lock); Systems engineering; Automation; Modeling and simulation; Industrial engineering; Construction management; Simulation; Software engineering; Engineering; Civil engineering","score_opus":0.012056505322784941,"score_gpt":0.1832137220702825,"score_spread":0.17115721674749756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986999660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016308177,0.0003247998,0.97760755,0.000018878723,0.0012288621,0.000109935594,0.000014953116,0.000035569432,0.004351265],"genre_scores_gemma":[0.9882372,0.0000028729194,0.009457174,0.000008590096,0.002217508,0.0000062768377,0.000013090271,0.000026409703,0.00003084978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934536,0.0000035899816,0.0003040115,0.000058882397,0.000079364145,0.00020876789],"domain_scores_gemma":[0.9996257,0.000034528875,0.000045849734,0.0000552103,0.000121775825,0.00011695195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010286595,0.0001088632,0.00014058364,0.0002962546,0.00005033819,0.00009372151,0.00008391703,0.000050428986,0.0000322088],"category_scores_gemma":[0.00004665359,0.00011936957,0.00007816985,0.000109082604,0.000009961997,0.00028469108,0.0000014220814,0.00012823787,0.0000012519224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019124989,9.4583635e-7,0.000058066576,0.000035303932,0.000015272339,0.0000050214344,0.000031746225,0.987523,0.00030892598,0.00441613,0.00149772,0.006105923],"study_design_scores_gemma":[0.00043506728,0.000022304508,0.0011039817,0.00007781818,0.000025077119,0.00017694416,0.000032462933,0.8852016,0.0017681703,0.0009112518,0.10995888,0.00028648248],"about_ca_topic_score_codex":0.00005174616,"about_ca_topic_score_gemma":0.004320254,"teacher_disagreement_score":0.9719291,"about_ca_system_score_codex":0.00024793265,"about_ca_system_score_gemma":0.00017523952,"threshold_uncertainty_score":0.486775},"labels":[],"label_agreement":null},{"id":"W1988285173","doi":"10.1111/1467-8667.00274","title":"Information Population of an Integrated Construction Management System","year":2002,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of New Brunswick","funders":"","keywords":"Computer science; Information system; Management information systems; Construction management; Systems engineering; Information management; Knowledge management; Engineering","score_opus":0.002722841995804883,"score_gpt":0.14785803208072462,"score_spread":0.14513519008491974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988285173","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35594037,0.00011509883,0.64066,0.0000042375877,0.0013208512,0.00016747085,0.0000146003795,0.0006297657,0.0011476101],"genre_scores_gemma":[0.96650577,0.000040322866,0.033236496,0.000007598733,0.00011717363,0.000010132108,0.00006426946,0.00001532459,0.0000029150194],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921703,0.0000121001,0.00038601964,0.00010478619,0.00013260459,0.0001474666],"domain_scores_gemma":[0.9996391,0.000009481914,0.00006681979,0.00015592195,0.00005808565,0.00007060379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004880862,0.00019229221,0.00019191683,0.00028567016,0.000048576636,0.00006708258,0.00007961952,0.000114093345,0.00003903794],"category_scores_gemma":[0.000002706056,0.00018959554,0.000035243887,0.0002546815,0.00002198826,0.0008298678,0.00001845703,0.00015093121,0.0000033924464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000449089,0.000004501657,0.00040880445,0.00059724244,0.000067210494,0.0000011722199,0.00035808253,0.4145742,0.00032710985,0.019986447,0.00019727032,0.56347346],"study_design_scores_gemma":[0.00031522766,0.000039075334,0.018271761,0.00014086673,0.000021983005,0.00012000862,0.00020250559,0.97768426,0.0003343665,0.000092454364,0.002582651,0.00019483636],"about_ca_topic_score_codex":0.000008512229,"about_ca_topic_score_gemma":0.0000019111158,"teacher_disagreement_score":0.61056536,"about_ca_system_score_codex":0.00008060958,"about_ca_system_score_gemma":0.0000017876697,"threshold_uncertainty_score":0.7731482},"labels":[],"label_agreement":null},{"id":"W1989707769","doi":"10.1061/9780784413517.203","title":"Dimensions of Interoperability in the AEC Industry","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Interoperability; Construct (python library); Knowledge management; Cross-domain interoperability; Computer science; Dimension (graph theory); Semantic interoperability; Domain (mathematical analysis); Conceptual framework; Information system; Process (computing); Process management; Systems engineering; Engineering; Engineering management; World Wide Web","score_opus":0.03174179331005929,"score_gpt":0.30880099517769743,"score_spread":0.27705920186763816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989707769","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98488,0.000116004056,0.0009850641,0.00035006268,0.0011589177,0.00024395782,0.0000073131478,0.000069315756,0.012189391],"genre_scores_gemma":[0.9995126,0.00005312788,0.00021176884,0.00001822649,0.000084461666,0.00004814471,0.0000035359394,0.000009708815,0.00005841206],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99842364,0.00048815657,0.00031413813,0.00016646761,0.00037322234,0.00023436215],"domain_scores_gemma":[0.998957,0.00025361608,0.00003173972,0.00039497713,0.00030830724,0.000054377724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014325602,0.00009477329,0.00014978388,0.00026804427,0.00009906399,0.000046665908,0.000252047,0.00020033676,0.00029206008],"category_scores_gemma":[0.00028303458,0.00006354388,0.000043186064,0.00042124465,0.0007120032,0.00014819921,0.000035863202,0.0010341217,0.00004588158],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008857121,0.00013280277,0.19018868,0.00027352502,0.00008447919,0.0000047735143,0.0016917924,0.0023804745,0.017203657,0.1665679,0.03547958,0.58590376],"study_design_scores_gemma":[0.006001975,0.00085452845,0.23134686,0.0011651043,0.00007487573,0.00074667804,0.039560955,0.1627889,0.08391022,0.0703136,0.4013971,0.0018391972],"about_ca_topic_score_codex":0.00008275017,"about_ca_topic_score_gemma":0.00013289799,"teacher_disagreement_score":0.58406454,"about_ca_system_score_codex":0.00005382521,"about_ca_system_score_gemma":0.000040368093,"threshold_uncertainty_score":0.44928017},"labels":[],"label_agreement":null},{"id":"W1990630350","doi":"10.2118/2006-019","title":"Alternative Real-Time and Historical Visualization of Cementing Operations Data","year":2006,"lang":"en","type":"article","venue":"Canadian International Petroleum Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Visualization; Data visualization; Real-time computing; Computer graphics (images); Data mining","score_opus":0.02272969835358207,"score_gpt":0.23658632602127014,"score_spread":0.21385662766768807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990630350","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8174242,0.00014026459,0.038019832,0.00057832757,0.0015922578,0.00013134649,0.00062846957,0.00013394972,0.14135136],"genre_scores_gemma":[0.99737865,0.00005103251,0.0005888788,0.0000124764865,0.0001504428,0.0000064345113,0.00057459756,0.000009936409,0.0012275556],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993634,0.000012908693,0.00022827584,0.00015376223,0.00013483895,0.000106788204],"domain_scores_gemma":[0.99956614,0.000016751916,0.000032288277,0.00014355646,0.00017109749,0.00007014789],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006371141,0.000083216124,0.000089102374,0.00020775672,0.00005362187,0.00006574011,0.00020879284,0.00004332921,0.00035605556],"category_scores_gemma":[0.000024290335,0.00009518213,0.00001306159,0.00006792753,0.000033923112,0.00029240633,0.000023394285,0.000056388006,0.000011946306],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012140115,0.00003907275,0.017350908,0.000037345555,0.00017855379,0.000010355196,0.00027728343,0.103839055,0.0409202,0.81377405,0.016239678,0.007321338],"study_design_scores_gemma":[0.00018732515,0.000011192315,0.004164351,0.000027402099,0.00001244614,0.000009795027,0.0000274895,0.97748774,0.00075373234,0.00075586484,0.016427945,0.00013473009],"about_ca_topic_score_codex":0.09861866,"about_ca_topic_score_gemma":0.110459745,"teacher_disagreement_score":0.87364864,"about_ca_system_score_codex":0.00033695702,"about_ca_system_score_gemma":0.0001103036,"threshold_uncertainty_score":0.90738374},"labels":[],"label_agreement":null},{"id":"W1991371878","doi":"10.5555/1030453.1030703","title":"CEPM 1: optimal construction project planning","year":2002,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Component (thermodynamics); Work (physics); Computer science; Pre-construction services; Production (economics); Industry 4.0; Systems engineering; Process management; Project planning; Engineering management; Project management; Construction engineering; Risk analysis (engineering); Engineering; Business","score_opus":0.04683132176019348,"score_gpt":0.2603667320102238,"score_spread":0.21353541025003034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991371878","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19588558,0.000116636926,0.7511966,0.00006741418,0.001480894,0.00021556443,0.000009802784,0.00077954127,0.050247926],"genre_scores_gemma":[0.9965918,0.000006831004,0.0028310006,0.000025209423,0.00015285978,0.00001388482,0.000010357007,0.000013742031,0.00035430622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993708,0.000017831908,0.00021092972,0.00014749808,0.00011389108,0.00013900956],"domain_scores_gemma":[0.99968356,0.000030144402,0.00003483251,0.00012419236,0.00009448402,0.000032764117],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000031620122,0.00012492634,0.00010008414,0.0001185434,0.00006231454,0.000089458605,0.00007078545,0.00008181017,0.0011476987],"category_scores_gemma":[0.000013213871,0.00012748747,0.000038932933,0.00013133191,0.000048085283,0.00032987175,0.000008987188,0.00014112634,0.00012346434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014596269,0.000014952725,0.0029620149,0.00003146106,0.000044231878,0.0000030941271,0.0023178153,0.816279,0.0013192572,0.005905456,0.0019333344,0.16917479],"study_design_scores_gemma":[0.00020913531,0.000020520416,0.00046516935,0.000038834656,0.000007644856,0.000017306527,0.00026972816,0.9863178,0.0007366964,0.0001299543,0.011634592,0.00015258386],"about_ca_topic_score_codex":0.0000027089109,"about_ca_topic_score_gemma":0.0000017304212,"teacher_disagreement_score":0.8007062,"about_ca_system_score_codex":0.000037898117,"about_ca_system_score_gemma":0.0000073904625,"threshold_uncertainty_score":0.9997654},"labels":[],"label_agreement":null},{"id":"W1991412404","doi":"10.1061/41109(373)26","title":"A Simulation Driven Visualization Framework for Construction Operations: Development and Application","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Visualization; Computer science; Component (thermodynamics); High-level architecture; Construction industry; Systems engineering; Data visualization; Architecture; Software engineering; Construction engineering; Engineering; Interoperability; Data mining; Operating system","score_opus":0.007830445393437012,"score_gpt":0.2597025157271291,"score_spread":0.2518720703336921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991412404","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12924695,0.000010108896,0.86951125,0.000026864725,0.0003591465,0.0003336113,0.0000020364205,0.00024728721,0.00026273678],"genre_scores_gemma":[0.7170275,0.000003079818,0.2826284,0.00001936129,0.000087227614,0.00016069169,0.00004733185,0.000010296378,0.000016127351],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956524,0.0000044124367,0.00017878761,0.00011798087,0.000060850034,0.000072705734],"domain_scores_gemma":[0.999709,0.000056472294,0.000017382003,0.000078522506,0.00010602964,0.00003256809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000051944327,0.00007959114,0.000060146616,0.00007188768,0.00014054212,0.000060516955,0.000025959243,0.00012520171,0.00003458146],"category_scores_gemma":[0.000046741105,0.00008024407,0.000010782209,0.0000985323,0.000029001505,0.00019966441,0.0000040160276,0.00007654008,0.000007956294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003394285,0.000006369866,0.00041031715,0.000021436927,0.000010213672,1.02640705e-8,0.00023836271,0.10277526,0.01538859,0.6306397,0.000012016115,0.25049433],"study_design_scores_gemma":[0.00013052477,0.000008651261,0.0004953417,0.0000063037155,0.000007277385,0.0000028490456,0.000109030756,0.9606414,0.021945136,0.0062768324,0.010261864,0.000114794304],"about_ca_topic_score_codex":0.0000021903686,"about_ca_topic_score_gemma":0.000084272324,"teacher_disagreement_score":0.8578661,"about_ca_system_score_codex":0.000020207313,"about_ca_system_score_gemma":0.000016095048,"threshold_uncertainty_score":0.3272258},"labels":[],"label_agreement":null},{"id":"W1992421768","doi":"10.1139/l02-043","title":"Contractor integrated technical information service in construction","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction management; Building information modeling; Process (computing); Service (business); Key (lock); Integrated project delivery; Engineering management; Construction industry; Pre-construction services; Process management; Information sharing; Computer science; Engineering; Project management; Construction engineering; Systems engineering; Operations management; Project planning; Computer security; Business; World Wide Web","score_opus":0.00526877139542775,"score_gpt":0.15514180988648843,"score_spread":0.14987303849106068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992421768","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6780911,0.0041310624,0.24957433,0.0014921945,0.012245252,0.00058630476,0.00009215769,0.00057064876,0.05321696],"genre_scores_gemma":[0.9990919,0.000028955845,0.0007444357,0.000038394337,0.00007658386,0.0000025557863,0.0000032153218,0.000010287312,0.0000036394067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993141,0.0000055906216,0.0003914347,0.000033693945,0.00008274776,0.00017239715],"domain_scores_gemma":[0.99953306,0.00001594585,0.000051780196,0.00006231131,0.00014280913,0.00019408093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008655528,0.00009934017,0.0001364211,0.0005711587,0.000019532547,0.00005597882,0.00008885368,0.00010882375,0.00042123135],"category_scores_gemma":[0.00006617548,0.00010337482,0.000036549438,0.00041233705,0.000014515038,0.0007074679,0.0000013849102,0.00036622758,0.000017295022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013760929,0.000013585453,0.0059475997,0.0002315364,0.00011039548,0.00009516331,0.001683602,0.8509652,0.0076844837,0.0115970615,0.009470104,0.112187535],"study_design_scores_gemma":[0.0019205712,0.0000879344,0.023437887,0.00072695286,0.000042946074,0.0031805069,0.0007053687,0.7128697,0.0014370529,0.00029514925,0.25452295,0.0007729821],"about_ca_topic_score_codex":0.00027461315,"about_ca_topic_score_gemma":0.061065115,"teacher_disagreement_score":0.32100084,"about_ca_system_score_codex":0.00028052242,"about_ca_system_score_gemma":0.00007082382,"threshold_uncertainty_score":0.956068},"labels":[],"label_agreement":null},{"id":"W1993372756","doi":"10.1139/l08-005","title":"Production prediction of conventional and global positioning system–based earthmoving systems using simulation and multiple regression analysis","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Inha University","keywords":"Global Positioning System; Production (economics); Productivity; Process (computing); Industrial engineering; Regression analysis; Engineering; Estimation; Data collection; Cost estimate; Selection (genetic algorithm); Computer science; Operations research; Systems engineering; Machine learning","score_opus":0.0110056174314461,"score_gpt":0.1883001692069025,"score_spread":0.17729455177545642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993372756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7379061,0.0012422857,0.26004836,0.000004663343,0.00064937,0.00006217782,0.000024288125,0.000026550386,0.000036215235],"genre_scores_gemma":[0.99909806,0.000008822518,0.0007426003,7.07146e-7,0.00012986106,8.4329054e-7,0.0000077543,0.000009494817,0.0000018338877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992862,0.000019618095,0.00036533416,0.00008242595,0.0001362965,0.00011015727],"domain_scores_gemma":[0.9994416,0.00002589083,0.00012843382,0.000057723206,0.00019511711,0.00015119955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014834834,0.00009865453,0.00019458322,0.00046086684,0.00011205437,0.000029691286,0.00002637161,0.00007166808,0.0000043932077],"category_scores_gemma":[0.00005072289,0.00010310884,0.00005666668,0.000357996,0.00003351511,0.00028844504,0.000002101159,0.00009736339,7.619491e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041802805,0.0000012347726,0.046955954,0.00013314107,0.0001019954,0.000005736117,0.00006147072,0.950239,0.0022857282,0.00011149958,0.000006469315,0.00009361628],"study_design_scores_gemma":[0.00021253951,0.000017037375,0.03812429,0.00043483908,0.0001366183,0.00037327912,0.000104737555,0.960227,0.00026470365,0.0000024221954,0.000032979045,0.000069525704],"about_ca_topic_score_codex":0.00031795245,"about_ca_topic_score_gemma":0.0012945428,"teacher_disagreement_score":0.261192,"about_ca_system_score_codex":0.000220825,"about_ca_system_score_gemma":0.000093293485,"threshold_uncertainty_score":0.42046565},"labels":[],"label_agreement":null},{"id":"W1993417500","doi":"10.1139/cjce-2014-0303","title":"The constructs of site layout modeling: an overview","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Site planning; Construct (python library); Systems engineering; Engineering; Engineering drawing","score_opus":0.02913142268579655,"score_gpt":0.20977067711530273,"score_spread":0.18063925442950618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993417500","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8492466,0.045732774,0.088467024,0.00020487986,0.0068547544,0.00016398163,0.00003965237,0.000104844214,0.0091854455],"genre_scores_gemma":[0.9993937,0.000096383716,0.0003275475,0.000008283959,0.00014402374,7.545709e-7,0.0000010589773,0.000017126851,0.000011134211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935573,0.000010287641,0.00030752097,0.000039745515,0.0001197697,0.00016694298],"domain_scores_gemma":[0.9991761,0.00001650545,0.000049739865,0.00011831107,0.00022610227,0.0004132418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022004668,0.00008991429,0.00013905388,0.00014922075,0.00003388212,0.00004402913,0.00014068442,0.00005223276,0.00002050173],"category_scores_gemma":[0.00006521262,0.00007402336,0.000051384046,0.00013971502,0.00002732753,0.00021461614,0.0000026700598,0.00018237723,0.0000021000756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019730705,8.036097e-7,0.0003383367,0.000021615642,0.00003194866,0.000007787997,0.00040814158,0.98826,0.0003020226,0.0071682897,0.00044324456,0.003015894],"study_design_scores_gemma":[0.0002837157,0.00004696909,0.00014966047,0.00013627688,0.000025281439,0.00032567995,0.00040587955,0.97818816,0.00033345967,0.0007332455,0.019221826,0.00014982153],"about_ca_topic_score_codex":0.00029711614,"about_ca_topic_score_gemma":0.041904442,"teacher_disagreement_score":0.15014705,"about_ca_system_score_codex":0.00009640483,"about_ca_system_score_gemma":0.00032567713,"threshold_uncertainty_score":0.9755783},"labels":[],"label_agreement":null},{"id":"W1993588702","doi":"10.1016/s1389-1286(00)00198-5","title":"MSC and SDL in project life cycles","year":2001,"lang":"en","type":"article","venue":"Computer Networks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Computer science","score_opus":0.009946228646182725,"score_gpt":0.2016596295578581,"score_spread":0.19171340091167538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993588702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4479777,0.0016326645,0.5459041,0.000059063925,0.001104796,0.00011978282,3.660924e-7,0.00026110897,0.0029403907],"genre_scores_gemma":[0.9973871,0.00028127423,0.0017305706,0.00008300119,0.0004791408,0.000007525153,0.000002790317,0.000008158041,0.00002043354],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969757,0.000008994909,0.000091521724,0.00007688919,0.000027714521,0.0000973056],"domain_scores_gemma":[0.99988824,0.000013641447,0.000006987854,0.0000593181,0.0000072461203,0.000024557365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000029243383,0.00006050104,0.00006603217,0.000048708862,0.000016403992,0.000033263674,0.00003398167,0.000053716354,0.000009454044],"category_scores_gemma":[7.999959e-7,0.00005804194,0.000011884976,0.00011002546,0.000013809138,0.0000633263,0.000012287688,0.00010201301,0.000003572591],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067098867,0.000008478308,0.027459573,0.000012833732,0.00001561402,0.000009456735,0.00018740726,0.22534631,0.000008525635,0.0016214886,0.011445391,0.7338782],"study_design_scores_gemma":[0.00014164673,0.000008193237,0.01552485,0.000023800874,0.000001627971,0.000023069057,0.0000103541515,0.97418875,0.0000032455748,0.00011667867,0.009884741,0.000073030504],"about_ca_topic_score_codex":0.000009562191,"about_ca_topic_score_gemma":0.000033858727,"teacher_disagreement_score":0.7488424,"about_ca_system_score_codex":0.0000102834365,"about_ca_system_score_gemma":0.000004105569,"threshold_uncertainty_score":0.23668815},"labels":[],"label_agreement":null},{"id":"W1994082041","doi":"10.5555/2431518.2431939","title":"Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Task (project management); Simulation modeling; Productivity; Real-time computing; Data mining; Systems engineering; Engineering","score_opus":0.027703407505942607,"score_gpt":0.23624791773201415,"score_spread":0.20854451022607154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994082041","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6766481,0.000023991748,0.31494376,0.000010157974,0.0003940948,0.00044511957,0.000022566925,0.00025956376,0.007252665],"genre_scores_gemma":[0.9679987,0.000011757029,0.031819295,0.0000014420947,0.000057740686,0.000018250708,0.00002185434,0.000015215334,0.000055749893],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928796,0.000022346905,0.00030081536,0.00016616755,0.00009797587,0.0001247473],"domain_scores_gemma":[0.999617,0.000032386753,0.000102523954,0.00011670683,0.00010134361,0.000030029056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019411545,0.00011732374,0.00016009955,0.00010270389,0.00008525254,0.000015329068,0.000026156531,0.00008137944,0.000068536574],"category_scores_gemma":[0.000044754324,0.00012084322,0.00003404532,0.00007729021,0.00010052596,0.0005718596,0.0000132735995,0.00005250586,6.9062116e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011702768,0.000078961886,0.019862855,0.0011480546,0.00022276488,6.061082e-7,0.0032687588,0.033769052,0.22188458,0.035752036,0.000081011196,0.6827611],"study_design_scores_gemma":[0.00088122283,0.00016580726,0.010557052,0.000055765933,0.000067203575,0.000016029438,0.0007396819,0.7808263,0.20243146,0.0036157244,0.00029949986,0.0003442598],"about_ca_topic_score_codex":0.0002545801,"about_ca_topic_score_gemma":0.00009781554,"teacher_disagreement_score":0.74705726,"about_ca_system_score_codex":0.00007190668,"about_ca_system_score_gemma":0.000029180359,"threshold_uncertainty_score":0.49278435},"labels":[],"label_agreement":null},{"id":"W1994119669","doi":"10.1680/mpal.12.00009","title":"The chronographical approach for construction project modelling","year":2013,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Planner; Graphics; Schedule; Set (abstract data type); Scheduling (production processes); Statistical graphics; Representation (politics); Human–computer interaction; Artificial intelligence; Programming language; Engineering; Computer graphics (images)","score_opus":0.010420659588965583,"score_gpt":0.1831383901782016,"score_spread":0.172717730589236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994119669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050363433,0.0012877039,0.77464086,0.00047459514,0.0011501424,0.0064594042,0.0000104391665,0.00037487797,0.16523854],"genre_scores_gemma":[0.9885821,0.0002604014,0.010645992,0.000009922689,0.00004178186,0.00038748345,0.000002526825,0.000010320458,0.000059500424],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992249,0.0000020785421,0.00029481578,0.00012676851,0.00020182338,0.00014958727],"domain_scores_gemma":[0.9996394,0.000008817118,0.00009365669,0.00007023753,0.00016675086,0.000021162745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001801813,0.00013195958,0.00011870902,0.00008509342,0.00019440264,0.00006470698,0.00015561143,0.000056033805,0.0000024009487],"category_scores_gemma":[0.0000049329524,0.0000858337,0.00006697469,0.00021890717,0.000278061,0.00033775668,0.00002943307,0.000089564324,1.7801123e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013001516,0.00001786998,0.00005598153,0.0008181083,0.000118698794,4.3904023e-9,0.00009302871,0.021763055,0.001188496,0.96970445,0.000801978,0.0054253177],"study_design_scores_gemma":[0.0013493623,0.00013178588,0.00015960072,0.0002885995,0.0002685187,0.000008984526,0.0023615512,0.8982167,0.026434757,0.017636226,0.05271924,0.00042463187],"about_ca_topic_score_codex":0.000012150172,"about_ca_topic_score_gemma":0.000003764343,"teacher_disagreement_score":0.9520682,"about_ca_system_score_codex":0.000031374428,"about_ca_system_score_gemma":0.0000065598156,"threshold_uncertainty_score":0.35001966},"labels":[],"label_agreement":null},{"id":"W1996097716","doi":"10.1061/41109(373)28","title":"An Optimization Model for Dynamic Multi-Project Environment in Construction","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Profitability index; Computer science; Mathematical optimization; Profit (economics); Discrete event simulation; Industrial engineering; Operations research; Engineering; Simulation; Mathematics","score_opus":0.009346053719204333,"score_gpt":0.22523193853102902,"score_spread":0.2158858848118247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996097716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057739593,0.0000039000056,0.9412853,0.000012543257,0.0002831234,0.00020339021,0.000008029777,0.00012756007,0.0003365567],"genre_scores_gemma":[0.578036,0.000014918591,0.42177647,0.000005441729,0.000012061328,0.000057671266,0.000031039675,0.000009648884,0.000056706504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965507,0.0000038508138,0.000121823694,0.00010049698,0.000037304217,0.000081435035],"domain_scores_gemma":[0.99985766,0.0000045648267,0.000012115238,0.000096718024,0.000010513741,0.00001842365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000041993477,0.000067317465,0.00005239226,0.00008649696,0.000025023008,0.000017710152,0.000034575245,0.00008400465,0.000059271268],"category_scores_gemma":[0.0000027366868,0.00006692075,0.00001788991,0.00003976002,0.000021886563,0.00018823417,0.000002096802,0.00008657539,0.0000027744666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003263793,0.000011020273,0.00014385856,0.0000048204206,0.0000021309074,2.7989953e-8,0.00006587429,0.9625778,0.013026129,0.002323994,0.0000072350026,0.021833822],"study_design_scores_gemma":[0.00030573754,0.0000089665455,0.00010045493,0.0000014624804,0.0000032073924,0.0000040963837,0.00011129457,0.9983404,0.00073480414,0.00025927505,0.000047159294,0.000083129424],"about_ca_topic_score_codex":0.000011802507,"about_ca_topic_score_gemma":0.0002787492,"teacher_disagreement_score":0.52029645,"about_ca_system_score_codex":0.000035940928,"about_ca_system_score_gemma":0.000009440129,"threshold_uncertainty_score":0.2728949},"labels":[],"label_agreement":null},{"id":"W1997159502","doi":"10.1016/j.autcon.2004.02.004","title":"A CAD-based model for site planning","year":2004,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"CAD; Interconnectivity; Computer Aided Design; Interface (matter); Engineering drawing; Object (grammar); Feature (linguistics); Set (abstract data type); Computer science; Engineering; Artificial intelligence; Programming language","score_opus":0.013572251697161742,"score_gpt":0.23587580195922345,"score_spread":0.2223035502620617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997159502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31778583,0.000026548214,0.68052053,0.000072114024,0.0004407312,0.00017109636,0.000011897265,0.00040635647,0.0005648836],"genre_scores_gemma":[0.94922405,0.0000020622263,0.050495937,0.00003595606,0.00004975074,0.0001206351,0.000047303194,0.000014939365,0.000009373128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994071,0.0000069606212,0.00024923202,0.000120702454,0.000087716864,0.0001282661],"domain_scores_gemma":[0.9997683,0.000021384458,0.000042349875,0.00008913634,0.000052486168,0.000026311829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000074105774,0.00009913714,0.000092667855,0.00022436373,0.000062392675,0.000034224715,0.00003504308,0.000104519124,0.000010996782],"category_scores_gemma":[0.000016452655,0.00011345787,0.000039690472,0.00019074474,0.000033301345,0.00027241788,0.0000021992262,0.000087941495,0.000011018704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073676933,0.0000045012766,0.000865029,0.00003113866,0.0000042511156,2.2087968e-7,0.00027120992,0.9671542,0.0022213056,0.0152779855,0.00004507331,0.014117734],"study_design_scores_gemma":[0.0008664785,0.000010613808,0.0009818358,0.00005850229,0.0000066193734,0.000014438925,0.00009773631,0.9825637,0.00425125,0.010898129,0.00012841297,0.00012231844],"about_ca_topic_score_codex":0.000012681592,"about_ca_topic_score_gemma":0.00006497128,"teacher_disagreement_score":0.6314382,"about_ca_system_score_codex":0.00018520925,"about_ca_system_score_gemma":0.00005463881,"threshold_uncertainty_score":0.46266776},"labels":[],"label_agreement":null},{"id":"W1997300884","doi":"10.1139/l05-124","title":"Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Inha University","keywords":"Global Positioning System; Productivity; Truck; Engineering; Work (physics); Transport engineering; Industrial engineering; Operations research; Telecommunications; Automotive engineering; Mechanical engineering","score_opus":0.003070543290038536,"score_gpt":0.19453128681888876,"score_spread":0.19146074352885023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997300884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5689104,0.00025013697,0.4300761,0.000017586308,0.00031105816,0.00007479375,0.000050573308,0.000022560316,0.00028676793],"genre_scores_gemma":[0.9993172,0.0000011195541,0.0005413885,0.0000014565389,0.00008534691,0.0000031879586,0.00003929011,0.000008816951,0.0000021524768],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991612,0.000020754203,0.00048369067,0.0000729676,0.00012231928,0.000139073],"domain_scores_gemma":[0.99959683,0.000022871553,0.000080699974,0.00006804721,0.00016001186,0.00007153332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020848111,0.00008974027,0.00018302626,0.0006124547,0.000044837012,0.000052120857,0.00005006466,0.00005248321,0.00003726784],"category_scores_gemma":[0.000024959902,0.000106615946,0.000066913504,0.0009615253,0.000007823752,0.00041555014,0.0000015543021,0.00009429904,3.698259e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010184843,0.0000024797844,0.011823185,0.000022848419,0.00008471525,0.0000017643945,0.00011507601,0.982014,0.0033399009,0.0020605633,0.000022017148,0.00051245117],"study_design_scores_gemma":[0.00016787519,0.000011212903,0.114703916,0.000051557923,0.00012519478,0.000009139541,0.0001269444,0.884119,0.00051831,0.000020296604,0.000056949855,0.00008964127],"about_ca_topic_score_codex":0.0053218366,"about_ca_topic_score_gemma":0.26888785,"teacher_disagreement_score":0.4304068,"about_ca_system_score_codex":0.0005799424,"about_ca_system_score_gemma":0.00011254238,"threshold_uncertainty_score":0.80450606},"labels":[],"label_agreement":null},{"id":"W1999129289","doi":"10.1155/2014/847430","title":"Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Schedule; Identification (biology); Process (computing); Systems engineering; Computer science; Simulation modeling; Risk analysis (engineering); Modeling and simulation; System lifecycle; Process management; Engineering; Software engineering; Application lifecycle management; Software","score_opus":0.011200375293203455,"score_gpt":0.2072075331829719,"score_spread":0.19600715788976844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999129289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.090242155,0.00009928097,0.906987,0.000007509517,0.002302821,0.00022274032,0.000009335354,0.000092877766,0.000036239348],"genre_scores_gemma":[0.8968315,0.000019035113,0.10278127,0.0000012364101,0.00031779354,0.000015882373,0.000004826567,0.000025357822,0.000003097081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985733,0.000038194383,0.0009455872,0.00010554594,0.00020849574,0.00012887831],"domain_scores_gemma":[0.99900997,0.00012229427,0.0004384239,0.00013072469,0.00024381558,0.000054760225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048672894,0.00015357479,0.00027091816,0.00033898695,0.000047110145,0.00003844441,0.000081908365,0.00008349887,0.000012201631],"category_scores_gemma":[0.00006598062,0.00015992459,0.00010480661,0.0000952037,0.000047471614,0.00040309847,0.000004646567,0.00012562914,0.0000021746393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028252538,0.000005539984,0.000028478453,0.00026277392,0.00004492498,2.5754386e-7,0.0000435883,0.80584216,0.14929481,0.0031306574,0.00001832755,0.041300245],"study_design_scores_gemma":[0.00046985102,0.00009107427,0.00010800708,0.00012838661,0.00007224614,0.0004203129,0.00017565227,0.78987366,0.20689087,0.0001790838,0.0014576392,0.0001332434],"about_ca_topic_score_codex":4.740851e-7,"about_ca_topic_score_gemma":3.5592084e-8,"teacher_disagreement_score":0.80658937,"about_ca_system_score_codex":0.00017145714,"about_ca_system_score_gemma":0.000023819548,"threshold_uncertainty_score":0.65215355},"labels":[],"label_agreement":null},{"id":"W2000118605","doi":"10.1016/j.autcon.2010.10.002","title":"On-site visualization of building component erection enabled by integration of four-dimensional modeling and automated surveying","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Component (thermodynamics); Building model; Software; Visualization; Model building; Position (finance); Computer science; Orientation (vector space); Controller (irrigation); Engineering; Simulation; Data mining","score_opus":0.02104407410854345,"score_gpt":0.23569148847566906,"score_spread":0.21464741436712562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000118605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78639036,0.000040519466,0.21227519,0.000003419525,0.00046455953,0.00016805623,0.000010138098,0.00034390675,0.0003038315],"genre_scores_gemma":[0.99155164,0.000029404155,0.008285861,0.000004365401,0.000013074757,0.00001932418,0.00007549399,0.000018605744,0.00000224111],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987097,0.00010483609,0.00067276193,0.00018423604,0.00021042924,0.00011807372],"domain_scores_gemma":[0.99938273,0.00006752158,0.00021225338,0.00010855066,0.00019727273,0.00003164799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003139506,0.0001557433,0.00021997455,0.00050613016,0.000060262915,0.000015753702,0.00003934361,0.00014964721,0.000040384588],"category_scores_gemma":[0.000053623862,0.00016875897,0.000036219717,0.0004277083,0.000066295666,0.0004412893,0.0000097128805,0.00011264629,0.0000014608065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016303822,0.00010362325,0.015011963,0.00025328685,0.00007814171,6.1246544e-7,0.0017795671,0.23356016,0.64506173,0.054407503,0.00012889621,0.04945145],"study_design_scores_gemma":[0.00045909188,0.000046328845,0.0069699525,0.00020187015,0.000014400855,0.000022897093,0.00015343926,0.91078275,0.07939122,0.0018281396,0.000001565165,0.00012836121],"about_ca_topic_score_codex":0.00027714798,"about_ca_topic_score_gemma":0.000044242006,"teacher_disagreement_score":0.67722255,"about_ca_system_score_codex":0.00010644931,"about_ca_system_score_gemma":0.00001965993,"threshold_uncertainty_score":0.6881791},"labels":[],"label_agreement":null},{"id":"W2000923597","doi":"10.1061/(asce)0733-9364(2001)127:4(322)","title":"Improving Design Coordination for Building Projects. I: Information Model","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Component (thermodynamics); Consistency (knowledge bases); Computer science; Process (computing); Set (abstract data type); Design process; Systems engineering; Building information modeling; Conceptual design; Engineering design process; Information model; Hierarchy; Software engineering; Process management; Human–computer interaction; Engineering; Work in process; Artificial intelligence","score_opus":0.008737578101451553,"score_gpt":0.19057015039278882,"score_spread":0.18183257229133726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000923597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016829068,0.000098638135,0.981855,0.000047247937,0.0006865341,0.00019876004,0.0000012817559,0.00008280088,0.00020071356],"genre_scores_gemma":[0.6710424,0.00031461715,0.32846949,0.000012453742,0.00009906481,0.00002621273,0.0000019430352,0.000011687586,0.000022158032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994366,0.000004213623,0.00030888224,0.00004567009,0.000102893544,0.00010174572],"domain_scores_gemma":[0.9996805,0.000015699683,0.0001017703,0.000044588123,0.000119597215,0.0000378287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020026376,0.00009193249,0.00010274617,0.00034354543,0.00004705149,0.00006819767,0.000040363677,0.00004319278,0.0000016665629],"category_scores_gemma":[0.000016723281,0.00009115673,0.000039424816,0.00011907471,0.000011834571,0.0007379541,0.000006312466,0.000079357735,2.9342576e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018542598,0.000002559071,0.000012962105,0.00014711458,0.000049947306,6.576874e-7,0.000060558457,0.70807594,0.0015641648,0.021069683,0.00023140518,0.26876646],"study_design_scores_gemma":[0.00051381235,0.000036805865,0.000043655848,0.000052103696,0.000046264457,0.00023332909,0.00019428808,0.9908881,0.0009463031,0.00049953617,0.0064466144,0.000099180914],"about_ca_topic_score_codex":6.28721e-7,"about_ca_topic_score_gemma":1.23337e-7,"teacher_disagreement_score":0.6542133,"about_ca_system_score_codex":0.00006899549,"about_ca_system_score_gemma":0.000009766198,"threshold_uncertainty_score":0.37172636},"labels":[],"label_agreement":null},{"id":"W2004170337","doi":"10.1139/l07-112","title":"Sustainable precast concrete foundation system for residential construction","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Alberta Conservation Association; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Constructability; Precast concrete; Engineering; Civil engineering; Foundation (evidence); Framing (construction); Construction engineering; Architectural engineering; Standardization; Structural system; Expanded polystyrene; Structural engineering; Computer science","score_opus":0.006524337346697619,"score_gpt":0.17009054777254654,"score_spread":0.16356621042584893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004170337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26805878,0.0012278963,0.7160267,0.000073079,0.0075913942,0.00040025168,0.000018942164,0.00020267662,0.006400248],"genre_scores_gemma":[0.99794966,0.000014292957,0.0013807863,0.0000028161,0.00048792452,0.000008790328,0.0000047792055,0.000025823698,0.00012510376],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992672,0.000007454257,0.00032353014,0.00006211843,0.00009317926,0.00024647533],"domain_scores_gemma":[0.9993001,0.000025390978,0.000072302835,0.00007215405,0.0003063657,0.00022363829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013403053,0.00010611781,0.00015645986,0.00036748435,0.00013755525,0.000057760644,0.00008007416,0.00007922119,0.00005483983],"category_scores_gemma":[0.00006042401,0.00011985478,0.000079439145,0.0001551263,0.000034482426,0.00039597828,0.0000017849112,0.00014200665,0.0000031276134],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072001574,0.0000022107654,0.0022450169,0.0018735775,0.0005231807,0.00043817406,0.0025156213,0.8231798,0.013561782,0.13015683,0.01806068,0.007371157],"study_design_scores_gemma":[0.0057625147,0.0005459795,0.0047310116,0.0014614736,0.0003910536,0.029744282,0.008931032,0.5277632,0.038997144,0.00095106795,0.37870374,0.0020175127],"about_ca_topic_score_codex":0.00029701635,"about_ca_topic_score_gemma":0.0044056135,"teacher_disagreement_score":0.7298909,"about_ca_system_score_codex":0.00043539357,"about_ca_system_score_gemma":0.00035372708,"threshold_uncertainty_score":0.48875365},"labels":[],"label_agreement":null},{"id":"W2005451988","doi":"10.1139/l09-091","title":"Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Emissions Reduction Alberta; Canadian Natural Resources","funders":"","keywords":"Discrete event simulation; Expert system; Computer science; Fuzzy logic; Event (particle physics); Probabilistic logic; Relevance (law); Industrial engineering; Systems engineering; Simulation modeling; Data mining; Machine learning; Engineering; Artificial intelligence; Simulation","score_opus":0.017738548686402577,"score_gpt":0.242917076871011,"score_spread":0.22517852818460843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005451988","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.064451195,0.00335115,0.9297874,0.00007085806,0.0019396008,0.00016525382,0.0000060596485,0.00004594782,0.00018255957],"genre_scores_gemma":[0.98941475,0.0000341255,0.010246798,0.000009584278,0.00026201265,0.000007179186,0.000002365306,0.00001976436,0.0000034266689],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991378,0.000016995906,0.00045312513,0.0000877823,0.000068142544,0.00023612514],"domain_scores_gemma":[0.9994562,0.00013235839,0.00006834011,0.0000650136,0.00008520276,0.00019286606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031670657,0.00014820579,0.0002492136,0.0005595403,0.00003335118,0.000060796792,0.00006392465,0.00011171637,0.0000057438397],"category_scores_gemma":[0.0002098516,0.00015434054,0.00005694201,0.0001677361,0.000012922033,0.00027020415,0.0000016223455,0.000232939,1.8483979e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003871697,7.373987e-7,0.00013691254,0.00003846935,0.000017626779,0.0000061611613,0.00036099605,0.9801799,0.003839888,0.0059556705,0.000027004815,0.009432732],"study_design_scores_gemma":[0.00035812924,0.00006511719,0.0011114525,0.00031235567,0.000012747914,0.0002595906,0.000361107,0.9941094,0.00037273607,0.00032353835,0.0025245126,0.00018932455],"about_ca_topic_score_codex":0.0001326138,"about_ca_topic_score_gemma":0.0035064036,"teacher_disagreement_score":0.92496353,"about_ca_system_score_codex":0.00022369335,"about_ca_system_score_gemma":0.000069185306,"threshold_uncertainty_score":0.62938243},"labels":[],"label_agreement":null},{"id":"W2005733202","doi":"10.1108/09699981211237111","title":"Modelling industrial construction operations using a multi‐agent resource allocation framework","year":2012,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Resource allocation; Schedule; Scheduling (production processes); Process (computing); Set (abstract data type); Resource (disambiguation); Function (biology); Operations research; Industrial engineering; Mathematical optimization; Distributed computing; Engineering","score_opus":0.028777039970409566,"score_gpt":0.22301367396733698,"score_spread":0.19423663399692742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005733202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2706702,0.00019306905,0.72466725,0.000042439064,0.0029923345,0.00037873615,0.0000075709895,0.00068638945,0.00036199365],"genre_scores_gemma":[0.6709132,0.000020196312,0.32824025,0.000015013667,0.000645435,0.00006327151,0.000028315842,0.000046508223,0.000027760205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833864,0.000045713146,0.0005217738,0.0002849321,0.00029522605,0.00051369856],"domain_scores_gemma":[0.9993649,0.000034967623,0.000056089062,0.0003061022,0.000051368967,0.00018657248],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018134859,0.00035803157,0.00022807419,0.00047909224,0.0002576102,0.00012856067,0.00014182158,0.00019824073,0.00008062667],"category_scores_gemma":[0.000020590265,0.0003917421,0.00011578434,0.0005343032,0.000088230074,0.000451307,0.00003910018,0.0005419047,0.000027986836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008886999,0.000013192182,0.0003191959,0.000048688566,0.00012080807,7.9053007e-7,0.00033136795,0.9212713,0.00079758506,0.028331276,0.00001607317,0.048740823],"study_design_scores_gemma":[0.00046664913,0.000012941536,0.00018637894,0.00015080755,0.00010029065,0.00026478016,0.00071470864,0.99012935,0.0014196981,0.00013203346,0.005952293,0.00047008324],"about_ca_topic_score_codex":0.00002671179,"about_ca_topic_score_gemma":0.0000020410803,"teacher_disagreement_score":0.40024304,"about_ca_system_score_codex":0.0003349891,"about_ca_system_score_gemma":0.000013682784,"threshold_uncertainty_score":0.99985343},"labels":[],"label_agreement":null},{"id":"W2005746601","doi":"10.1061/(asce)cp.1943-5487.0000181","title":"Multiagent Approach for Real-Time Collision Avoidance and Path Replanning for Cranes","year":2011,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Collision avoidance; Real-time locating system; Multi-agent system; SAFER; Motion planning; Computer science; Collision; Path (computing); Real-time computing; Collision detection; Collision avoidance system; Engineering; State (computer science); Simulation; Artificial intelligence; Computer security; Computer network; Robot","score_opus":0.014768518578219663,"score_gpt":0.20919335986865426,"score_spread":0.19442484129043458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005746601","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33655438,0.0002696949,0.6623735,0.0000026425964,0.00030490893,0.00013717495,0.0000020008815,0.00005212636,0.00030362527],"genre_scores_gemma":[0.81925267,0.000042072796,0.18052684,0.0000024403016,0.00013995104,0.000005788449,0.0000013761997,0.00002185534,0.0000069813846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992679,0.000007164564,0.00040002388,0.00008953534,0.00007881433,0.00015658897],"domain_scores_gemma":[0.9995769,0.00013344733,0.00010037918,0.000061702856,0.000081630875,0.000045890214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041703432,0.00011312838,0.0002121073,0.0001612272,0.00003710531,0.000022936782,0.00007151553,0.00006409566,0.0000015970716],"category_scores_gemma":[0.00006888235,0.00010938194,0.000061483035,0.000088226116,0.000008376626,0.00011743423,0.000009044994,0.00013523603,1.2543798e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046310895,0.000021308713,0.0009118199,0.00038280257,0.000040719624,0.000003317348,0.0017405614,0.97834015,0.013514293,0.00043412013,0.00018785083,0.004376763],"study_design_scores_gemma":[0.0005783685,0.00007086987,0.0029718243,0.00027145777,0.000012841001,0.000081217935,0.00010504766,0.99318105,0.0023157257,0.000044969638,0.00024608814,0.00012051693],"about_ca_topic_score_codex":0.0000027460344,"about_ca_topic_score_gemma":0.0000010159785,"teacher_disagreement_score":0.48269832,"about_ca_system_score_codex":0.000047236626,"about_ca_system_score_gemma":0.000010357327,"threshold_uncertainty_score":0.4460466},"labels":[],"label_agreement":null},{"id":"W2005915515","doi":"10.1016/j.autcon.2014.06.001","title":"Automating motion trajectory Of crane-lifted loads","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Payload (computing); Rotation (mathematics); Trajectory; Computer science; Path (computing); Lift (data mining); Constant (computer programming); Control theory (sociology); Translation (biology); Function (biology); Motion (physics); Simulation; Artificial intelligence; Physics; Control (management)","score_opus":0.005433267552173013,"score_gpt":0.1955430761779907,"score_spread":0.19010980862581767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005915515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8392019,0.000033014214,0.1519989,0.000026361326,0.0011816467,0.0001382509,0.0000032034955,0.0006389495,0.006777753],"genre_scores_gemma":[0.9916076,0.000009580811,0.008220182,0.0000086673335,0.0000808294,0.00002489735,0.000023064582,0.000016151405,0.000009021079],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989518,0.00007597081,0.0005249768,0.00013982944,0.00017378957,0.0001336703],"domain_scores_gemma":[0.9995495,0.000059120786,0.00012482647,0.000152683,0.000083600964,0.000030288093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022976045,0.00012696953,0.00017386237,0.00035739894,0.000045204928,0.000021957123,0.00006162041,0.00014280956,0.00013253606],"category_scores_gemma":[0.000061175044,0.00014316035,0.00004991518,0.00040969648,0.00007675371,0.00036313818,0.000005238672,0.00013749012,0.00002063018],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008033193,0.00001935173,0.023959367,0.00020192724,0.000022988324,2.5237316e-7,0.00043701284,0.03007094,0.041387897,0.030692693,0.00008513791,0.8731144],"study_design_scores_gemma":[0.0006872591,0.000030035617,0.13912128,0.00012694587,0.00001616555,0.000053805416,0.00023302625,0.8252178,0.031218834,0.0028443022,0.00023181763,0.00021872343],"about_ca_topic_score_codex":0.00002113978,"about_ca_topic_score_gemma":0.000029469553,"teacher_disagreement_score":0.87289566,"about_ca_system_score_codex":0.0000966282,"about_ca_system_score_gemma":0.000016667342,"threshold_uncertainty_score":0.5837909},"labels":[],"label_agreement":null},{"id":"W2006902389","doi":"10.1139/l09-094","title":"Large-scale simulation modeling system for industrial construction","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Systems engineering; Plan (archaeology); Engineering; Production (economics); Supply chain; Scale (ratio); Industrial engineering; Computer science; Manufacturing engineering","score_opus":0.013377203913686611,"score_gpt":0.19084621518696118,"score_spread":0.17746901127327458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006902389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05062771,0.00027321614,0.9456947,0.00003130155,0.002512854,0.00009667335,0.000015416477,0.00007064575,0.00067747565],"genre_scores_gemma":[0.99793893,0.000002684332,0.0013015941,0.0000064772594,0.00072449713,0.0000019395873,0.0000033655167,0.000016269447,0.0000042500424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999302,0.000005119136,0.0003397026,0.0000583951,0.0000832459,0.00021148474],"domain_scores_gemma":[0.9994975,0.00001848435,0.00005100269,0.00006359032,0.00015079792,0.00021865845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015200209,0.00010487773,0.00015580948,0.0003208029,0.000065243126,0.00005473536,0.00006751634,0.0001237539,0.000017165965],"category_scores_gemma":[0.000037265745,0.000115281604,0.000083082086,0.00014137542,0.000004622178,0.000247727,7.20587e-7,0.00019288126,0.0000010237891],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039562356,7.637445e-7,0.000045535973,0.000018499824,0.000015013354,0.000001969465,0.00013140704,0.99424034,0.00027108824,0.0018083213,0.00010467413,0.0033583997],"study_design_scores_gemma":[0.00044497807,0.00003217974,0.000026253674,0.00013322085,0.000023090917,0.00009443946,0.00031683996,0.99549633,0.0002659713,0.00012946936,0.0029251254,0.0001120955],"about_ca_topic_score_codex":0.000017008573,"about_ca_topic_score_gemma":0.0025137446,"teacher_disagreement_score":0.9473112,"about_ca_system_score_codex":0.0002679824,"about_ca_system_score_gemma":0.00013119468,"threshold_uncertainty_score":0.47010472},"labels":[],"label_agreement":null},{"id":"W2013284030","doi":"10.3850/978-981-08-7920-4_s1-cp25-cd","title":"Cost and Experience based Method for Project Acceleration","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Acceleration; Computer science; Physics","score_opus":0.09677556336801335,"score_gpt":0.31439143953105536,"score_spread":0.217615876163042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013284030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009134678,0.000011489621,0.9797068,0.0000074308023,0.00012051961,0.00020102006,0.0000016300564,0.00011304833,0.010703355],"genre_scores_gemma":[0.6641146,0.0000031131617,0.3354385,0.000048717746,0.000022553542,0.00024621072,0.0000036203069,0.000005817265,0.00011691141],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998209,0.0000043286173,0.000054632717,0.000053596348,0.0000204525,0.000046086065],"domain_scores_gemma":[0.9999117,0.000011920394,0.0000053961608,0.00003839891,0.000021014755,0.0000115642115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000034243294,0.000035833724,0.000031189928,0.00002651534,0.000024622474,0.000014808797,0.000016232743,0.000024730749,0.0000814129],"category_scores_gemma":[0.000005572286,0.000030134392,0.0000092187565,0.000034761866,0.000007484069,0.00010393635,0.0000013543375,0.000017027922,9.822467e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004765498,0.000020302781,0.0016209518,0.00008006718,0.00001881341,2.7104872e-7,0.005908622,0.00021044485,0.03757218,0.065108165,0.0032030058,0.88620955],"study_design_scores_gemma":[0.00029022933,0.000034695666,0.00103151,0.000005333289,0.0000057912043,0.0000042706697,0.0008546165,0.6971294,0.2896197,0.0004205672,0.010488215,0.000115614006],"about_ca_topic_score_codex":0.00002534277,"about_ca_topic_score_gemma":0.000025540483,"teacher_disagreement_score":0.8860939,"about_ca_system_score_codex":0.0000068425124,"about_ca_system_score_gemma":0.0000060172047,"threshold_uncertainty_score":0.12288449},"labels":[],"label_agreement":null},{"id":"W2014164765","doi":"10.1061/40571(304)6","title":"Optimal Maintenance Planning of Reinforced Concrete Decks on Highway Network","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Ottawa","keywords":"Computer science; Genetic algorithm; Scheduling (production processes); Reinforced concrete; Transport engineering; Engineering; Structural engineering","score_opus":0.009578426595386125,"score_gpt":0.20783338035511506,"score_spread":0.19825495375972893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2014164765","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4730195,0.000082708466,0.22180466,0.000036657453,0.00089481997,0.00009001947,0.0000018494375,0.0004018423,0.30366793],"genre_scores_gemma":[0.99400234,0.00002092341,0.003586514,0.00006419308,0.00011852749,0.0000052734663,0.0000042739402,0.000009767236,0.0021881799],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956596,0.0000046654814,0.00015734932,0.000064228894,0.000069015994,0.00013876465],"domain_scores_gemma":[0.99980175,0.000021674115,0.000023070934,0.00009486578,0.00002882321,0.000029822852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042943422,0.00007410497,0.000092186805,0.000029080207,0.00002492633,0.000009641819,0.000050053528,0.00005532997,0.00025127034],"category_scores_gemma":[0.0000062775234,0.000063333995,0.000031584215,0.00009992261,0.000022083399,0.000061889084,0.0000046615005,0.00008536967,0.000032728687],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050070408,2.3781108e-7,0.0004864516,0.000008112787,0.000024025663,0.0000045308466,0.00007394515,0.89429367,0.0029558486,0.07918671,0.019931458,0.0029849485],"study_design_scores_gemma":[0.00070664514,0.00010276637,0.00085718423,0.00018690752,0.000012231861,0.00005859832,0.00024274469,0.9222829,0.02507608,0.00019250988,0.049975157,0.00030628807],"about_ca_topic_score_codex":0.0000072187413,"about_ca_topic_score_gemma":0.0000010489123,"teacher_disagreement_score":0.52098286,"about_ca_system_score_codex":0.00001851755,"about_ca_system_score_gemma":0.0000055109203,"threshold_uncertainty_score":0.2751234},"labels":[],"label_agreement":null},{"id":"W2015560731","doi":"10.1061/(asce)0887-3801(2004)18:2(115)","title":"Framework for Managing Life-Cycle Cost of Smart Infrastructure Systems","year":2004,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Activity-based costing; Life cycle costing; Computer science; System lifecycle; Cost driver; Risk analysis (engineering); Systems engineering; Engineering; Construction engineering; Business; Application lifecycle management; Software","score_opus":0.006303854287841952,"score_gpt":0.2135090053000524,"score_spread":0.20720515101221046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015560731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19222392,0.0006475675,0.8049219,0.00002448505,0.0018583329,0.00010327677,0.0000017750892,0.000049630555,0.00016907685],"genre_scores_gemma":[0.9724199,0.00003005629,0.027193729,0.0000073651163,0.00031794066,0.000002164804,5.25246e-7,0.000027506167,8.0309496e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897176,0.000006923549,0.000613386,0.000068113615,0.00015355996,0.00018622958],"domain_scores_gemma":[0.9994467,0.00013050844,0.00016576628,0.00009032701,0.0001002715,0.00006642722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025297367,0.00013094365,0.00029419264,0.0003020122,0.00002238067,0.00003471846,0.00013623638,0.00010696101,0.0000035849137],"category_scores_gemma":[0.00012008405,0.00013310643,0.00009265476,0.0002482536,0.000011459806,0.00013141692,0.0000123089985,0.0003818097,3.8141044e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071340123,0.0000055225823,0.00047696746,0.0002577938,0.000040863048,0.000002584656,0.0002623182,0.9824211,0.00048248286,0.013827553,0.000023045142,0.002192618],"study_design_scores_gemma":[0.00080339855,0.00006432083,0.004229852,0.0019535488,0.000022059252,0.00012981966,0.00027456,0.9871674,0.00082684826,0.0037412378,0.00059430726,0.00019262645],"about_ca_topic_score_codex":0.000004536272,"about_ca_topic_score_gemma":0.000004877589,"teacher_disagreement_score":0.780196,"about_ca_system_score_codex":0.00014460868,"about_ca_system_score_gemma":0.000037933536,"threshold_uncertainty_score":0.54279226},"labels":[],"label_agreement":null},{"id":"W2016010091","doi":"10.1061/(asce)0733-9364(2005)131:8(938)","title":"Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Relevance (law); Expert system; Fuzzy logic; Productivity; Computer science; Data mining; Industrial engineering; Artificial intelligence; Machine learning; Engineering; Economics","score_opus":0.011977122586400246,"score_gpt":0.20138050444172867,"score_spread":0.18940338185532843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016010091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9199565,0.0016865291,0.069669396,0.00012170087,0.007384199,0.00023457986,0.0000050972867,0.00021532383,0.00072666624],"genre_scores_gemma":[0.9692214,0.0006700701,0.027969193,0.0000069708985,0.0020692814,0.000008476779,0.0000010923709,0.000026479574,0.00002701336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989197,0.000022163926,0.0005220905,0.0001286948,0.00023195006,0.00017536979],"domain_scores_gemma":[0.99949235,0.00001596133,0.00017321255,0.00010579495,0.00012119484,0.00009145941],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024499683,0.00017576334,0.00023180018,0.00037172047,0.00007937799,0.00009721725,0.00006311416,0.00010301742,0.000008271681],"category_scores_gemma":[0.000018853214,0.0001744224,0.000057030695,0.00023199,0.000053997457,0.00056350656,0.000016420776,0.00027629532,0.0000010192588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003808494,0.00002245602,0.0027037007,0.0002224688,0.00043230763,0.000010335235,0.00022320598,0.6639026,0.0071627246,0.017143644,0.00036463235,0.3077739],"study_design_scores_gemma":[0.0041778376,0.00019209228,0.0022381847,0.0012656703,0.00046507712,0.009479166,0.0046636495,0.7962075,0.009138913,0.00022902068,0.1708134,0.00112952],"about_ca_topic_score_codex":0.0000058190467,"about_ca_topic_score_gemma":9.932397e-7,"teacher_disagreement_score":0.30664435,"about_ca_system_score_codex":0.0001670012,"about_ca_system_score_gemma":0.000018713581,"threshold_uncertainty_score":0.71127385},"labels":[],"label_agreement":null},{"id":"W2019060119","doi":"10.1016/j.autcon.2008.08.001","title":"Visualizing high-rise building construction strategies using linear scheduling and 4D CAD","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Scheduling (production processes); Computer science; Visualization; CAD; Project management; Software engineering; Systems engineering; Industrial engineering; Engineering; Engineering drawing; Operations management; Artificial intelligence","score_opus":0.0170725969977628,"score_gpt":0.2583357278586067,"score_spread":0.2412631308608439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019060119","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.770069,0.00020925299,0.22753805,0.000023705863,0.0012366473,0.00015624517,0.0000046200576,0.0005290281,0.00023345846],"genre_scores_gemma":[0.8396603,0.00014614496,0.15994328,0.000008430344,0.00018572388,0.00001665411,0.000010749905,0.000026451935,0.0000022543452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986453,0.00006416807,0.0005612218,0.0002774962,0.00020821294,0.00024360718],"domain_scores_gemma":[0.9994963,0.000048394122,0.00013625377,0.0001419233,0.00011170662,0.000065439795],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015800026,0.00023065429,0.00023821622,0.0005046401,0.0003703772,0.00012727344,0.000057351728,0.00022244094,0.000041353644],"category_scores_gemma":[0.000033657892,0.00027044097,0.0000421615,0.0005124837,0.0003448224,0.0013613901,0.000017158784,0.0002831456,0.000005494883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037646947,0.000027048443,0.043151796,0.00027735948,0.00009982519,0.00001816673,0.0016604534,0.4398618,0.10770401,0.26612762,0.000020576372,0.14101371],"study_design_scores_gemma":[0.0007793187,0.000022897226,0.0076670316,0.00017283742,0.000028866682,0.0016649172,0.0027304383,0.96691686,0.014474951,0.005003714,0.00013403448,0.00040413384],"about_ca_topic_score_codex":0.00020403859,"about_ca_topic_score_gemma":0.000032241824,"teacher_disagreement_score":0.5270551,"about_ca_system_score_codex":0.0002012292,"about_ca_system_score_gemma":0.000100858015,"threshold_uncertainty_score":0.9999748},"labels":[],"label_agreement":null},{"id":"W2019386889","doi":"10.1061/(asce)0733-9364(2002)128:2(174)","title":"Unified Modeling Methodology for Construction Simulation","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Flexibility (engineering); Systems engineering; Software engineering; Software; Management science; Industrial engineering; Engineering; Programming language","score_opus":0.040046077586934486,"score_gpt":0.24185171052688742,"score_spread":0.20180563293995293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019386889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03544824,0.00044181617,0.96145004,0.000054693428,0.0018910492,0.00012991452,0.0000016829342,0.00009294776,0.00048960117],"genre_scores_gemma":[0.77237445,0.0006940801,0.22667539,0.000009111629,0.0001924092,0.000008770994,0.0000011391786,0.000015944113,0.000028730065],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993043,0.000014345635,0.0003832925,0.00008243087,0.00009829619,0.000117321746],"domain_scores_gemma":[0.99962884,0.000055389843,0.00008408347,0.00006591489,0.000113720926,0.00005202847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018703386,0.000114480536,0.00017324167,0.00032119927,0.000050278577,0.00003359175,0.000042288713,0.00007144658,0.000022095055],"category_scores_gemma":[0.000022430151,0.00011594382,0.000056725836,0.000119535594,0.000025924935,0.00021772104,0.000006217517,0.00011227144,9.210396e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008780208,0.0000030868935,0.000008171207,0.00009612517,0.0000849478,0.0000010112942,0.00004823683,0.79322976,0.00069793354,0.023775995,0.0000522155,0.18199375],"study_design_scores_gemma":[0.00053676084,0.000042960724,0.000018237786,0.00004175127,0.000079008365,0.00028034853,0.0002581274,0.98760223,0.00046931722,0.0012890153,0.0092675,0.000114715825],"about_ca_topic_score_codex":4.0735287e-7,"about_ca_topic_score_gemma":2.465115e-7,"teacher_disagreement_score":0.7369262,"about_ca_system_score_codex":0.00004604672,"about_ca_system_score_gemma":0.0000023402351,"threshold_uncertainty_score":0.47280517},"labels":[],"label_agreement":null},{"id":"W2021332829","doi":"10.1016/j.ejor.2011.06.011","title":"Models and algorithms to improve earthwork operations in road design using mixed integer linear programming","year":2011,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Earthworks; Integer programming; Linear programming; Integer (computer science); Mathematical optimization; Computer science; Set (abstract data type); Process (computing); Linear model; Algorithm; Mathematics; Engineering","score_opus":0.16808669972142634,"score_gpt":0.33526374380344826,"score_spread":0.16717704408202191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021332829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27171296,0.00026640453,0.72589874,0.00010393483,0.00030330155,0.00028306097,0.0000031049879,0.000017577959,0.0014109027],"genre_scores_gemma":[0.81240606,0.000037334594,0.1872221,0.000016782018,0.00021770214,0.000005962915,0.000001257586,0.00002407244,0.00006871978],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998388,0.00046400816,0.00044364383,0.00012685849,0.00036609004,0.00021141826],"domain_scores_gemma":[0.9990744,0.00004668056,0.000021670225,0.00009016827,0.0006187436,0.00014831385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002549634,0.000098979035,0.00012609069,0.00042090678,0.00014003999,0.00014442165,0.00014522673,0.0000294225,0.0000558866],"category_scores_gemma":[0.00015326368,0.00008633138,0.00003098713,0.00034462675,0.000059308724,0.00054591213,0.0000391106,0.0004977677,0.000019118861],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012073044,0.00008097159,0.00016066984,0.000014449961,0.000059035625,0.000105367064,0.005307798,0.78105766,0.02428047,0.004867355,0.00024737953,0.18369813],"study_design_scores_gemma":[0.0005327512,0.00037967623,0.0015463087,0.00014576755,0.0000062158833,0.00016805579,0.0009867179,0.9895888,0.0054840045,0.00022093776,0.0007698796,0.00017091598],"about_ca_topic_score_codex":0.000025166188,"about_ca_topic_score_gemma":0.000017314007,"teacher_disagreement_score":0.5406931,"about_ca_system_score_codex":0.00007657062,"about_ca_system_score_gemma":0.00012191908,"threshold_uncertainty_score":0.35204917},"labels":[],"label_agreement":null},{"id":"W2022308534","doi":"10.1061/40754(183)119","title":"Case Study of Constructability Reasoning in MEP Coordination","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Process (computing); Computer science; Building information modeling; Table (database); Overlay; Systems engineering; Iterative and incremental development; Body of knowledge; Knowledge management; Process management; Software engineering; Engineering; Data mining; Operations management","score_opus":0.009826469734514141,"score_gpt":0.22945843912910036,"score_spread":0.2196319693945862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022308534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913142,0.000014510097,0.0015422769,0.000010332377,0.00008275254,0.00011541814,6.255714e-7,0.00007116363,0.0068487315],"genre_scores_gemma":[0.99859154,6.363612e-7,0.0013558149,0.0000022053146,0.000016276696,0.00000889749,5.1915805e-7,0.0000035831415,0.000020515059],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996318,0.00001709224,0.00018453933,0.00006298882,0.00005171359,0.000051865176],"domain_scores_gemma":[0.9998394,0.00001758838,0.000014935076,0.00007896516,0.000035335168,0.000013765961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000892799,0.000045339923,0.00007248061,0.00006681605,0.000013596837,0.0000058879805,0.000020320125,0.000028699162,0.00013700806],"category_scores_gemma":[0.000013613479,0.00004358852,0.00001076389,0.00013297108,0.000015101674,0.00011916277,0.000004045401,0.00005971352,0.0000024001438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013896541,0.00029710802,0.36803842,0.000044141812,0.000040513627,0.000066714536,0.0077352794,0.02784863,0.0030258796,0.012948194,0.00014796371,0.5797933],"study_design_scores_gemma":[0.0041385763,0.00023329303,0.047665086,0.00004265648,0.000041543266,0.003470518,0.08521223,0.8368943,0.020531902,0.0005565834,0.00067252066,0.0005407955],"about_ca_topic_score_codex":0.00033697046,"about_ca_topic_score_gemma":0.003378543,"teacher_disagreement_score":0.8090457,"about_ca_system_score_codex":0.000044506596,"about_ca_system_score_gemma":0.0000056583212,"threshold_uncertainty_score":0.18853062},"labels":[],"label_agreement":null},{"id":"W2022776917","doi":"10.1061/(asce)cp.1943-5487.0000467","title":"3D Visualization-Based Motion Planning of Mobile Crane Operations in Heavy Industrial Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Visualization; Modular design; Collision; Computer science; Set (abstract data type); Rotation (mathematics); Simulation; Engineering; Artificial intelligence","score_opus":0.014383784901511125,"score_gpt":0.2397754236961703,"score_spread":0.22539163879465918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022776917","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.551253,0.0000797359,0.44794378,0.0000052126907,0.00049660204,0.00007245143,4.1571775e-7,0.000030847208,0.00011791835],"genre_scores_gemma":[0.99600774,0.0000037915827,0.003743454,0.000004937908,0.0002152213,0.0000030943713,0.00000264756,0.000018074044,0.000001049539],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989014,0.000045456618,0.00068082666,0.00006950071,0.00016769856,0.00013512044],"domain_scores_gemma":[0.9995625,0.00015095047,0.000096743395,0.00006675683,0.00009001322,0.000033044056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063933275,0.00010858127,0.00024135908,0.0005949896,0.000019235804,0.000028866049,0.000081919774,0.0000987919,0.0000086091995],"category_scores_gemma":[0.00018267796,0.00011504115,0.000043367094,0.00045646384,0.000009656772,0.0001697029,0.000006825856,0.00031583259,3.8689015e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008656525,0.00002156988,0.0071799727,0.00005779163,0.000007463343,0.0000016335756,0.0004377372,0.98633033,0.0024266455,0.00018873277,0.000011665048,0.0033277858],"study_design_scores_gemma":[0.0007594207,0.00007217663,0.0043742177,0.00068143423,0.000005541217,0.000013319215,0.00006811839,0.99065655,0.0031346977,0.000005628996,0.00013165147,0.00009725382],"about_ca_topic_score_codex":0.000012395372,"about_ca_topic_score_gemma":0.000023463583,"teacher_disagreement_score":0.4447547,"about_ca_system_score_codex":0.00010547241,"about_ca_system_score_gemma":0.00004609187,"threshold_uncertainty_score":0.4691242},"labels":[],"label_agreement":null},{"id":"W2023346663","doi":"10.1061/(asce)0733-9364(2005)131:3(354)","title":"Change Orders Impact on Labor Productivity","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"National Evidence-based Healthcare Collaborating Agency","keywords":"Productivity; Change order; Field (mathematics); Computer science; Work (physics); Artificial neural network; Operations research; Industrial engineering; Engineering; Economics; Systems engineering; Project management; Economic growth; Artificial intelligence; Mathematics","score_opus":0.006143367867799938,"score_gpt":0.20308804547351975,"score_spread":0.19694467760571982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023346663","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97462344,0.0007474929,0.020361096,0.0006019933,0.0019806544,0.0001791907,0.000004030585,0.00015901172,0.0013430665],"genre_scores_gemma":[0.99337107,0.000590405,0.005470017,0.000022152693,0.0004968446,0.00000700952,5.1372825e-7,0.00001267539,0.000029324374],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950665,0.0000061184405,0.00019217498,0.00006664658,0.00012301854,0.00010540484],"domain_scores_gemma":[0.9997617,0.000007868485,0.00005245716,0.0000713773,0.000048425347,0.000058151316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010234539,0.000112638474,0.000121997364,0.0002595288,0.000025750584,0.000029648183,0.00003877676,0.00003371522,0.000023214146],"category_scores_gemma":[0.0000050111958,0.00009374023,0.000050566716,0.00013507549,0.000018327106,0.00027429935,0.0000058344835,0.00013928677,0.0000034945106],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032899534,0.000023284714,0.0005005134,0.00012066873,0.00025794326,0.000006806532,0.00013657704,0.17139916,0.0006671244,0.014478235,0.000975882,0.8114009],"study_design_scores_gemma":[0.004219746,0.0008307858,0.12306362,0.0008250755,0.0004047336,0.0032672524,0.00086710125,0.21016382,0.009368289,0.00067082886,0.6449171,0.0014016818],"about_ca_topic_score_codex":0.0000011708069,"about_ca_topic_score_gemma":7.95474e-7,"teacher_disagreement_score":0.8099992,"about_ca_system_score_codex":0.00007812764,"about_ca_system_score_gemma":0.000004210773,"threshold_uncertainty_score":0.38226157},"labels":[],"label_agreement":null},{"id":"W2023617898","doi":"10.1558/rsth.v23i1.6","title":"Hybrid Constructions","year":2004,"lang":"en","type":"article","venue":"Religious Studies and Theology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Computer science; Linguistics; Mathematics; Physics; Philosophy","score_opus":0.006888747682465781,"score_gpt":0.21759885975733106,"score_spread":0.21071011207486529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023617898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92552924,0.039210748,0.008879106,0.00074341736,0.0018054759,0.000101099606,0.000005103497,0.00042490594,0.02330092],"genre_scores_gemma":[0.98584354,0.013389722,0.00058164366,0.00007212732,0.000065476655,0.000011920332,8.358812e-7,0.000005903225,0.000028804363],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99970406,0.000005122185,0.000090518115,0.00007566278,0.00002274766,0.00010189638],"domain_scores_gemma":[0.9998644,0.000017909511,0.000010151993,0.000058027585,0.000029336054,0.000020184974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000020561247,0.00006857243,0.00010672753,0.000035661204,0.00008937817,0.000005171829,0.000020648433,0.000028047158,0.000005013602],"category_scores_gemma":[0.00000836112,0.000056927103,0.000020035095,0.000032726028,0.00019871921,0.000021363132,0.000013277729,0.000062568,0.000017802307],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000446884,0.0000035165078,0.00031874725,0.000027989261,0.00018739038,0.000008362511,0.00059887517,0.0013502525,0.0002907724,0.97755253,0.002088411,0.017568706],"study_design_scores_gemma":[0.00049870694,0.000059393413,0.00018797423,0.000021371497,0.000034044406,0.0011075046,0.0010769443,0.00013143528,0.0017184105,0.9867226,0.008286641,0.0001549915],"about_ca_topic_score_codex":0.000012327242,"about_ca_topic_score_gemma":0.000022506265,"teacher_disagreement_score":0.060314342,"about_ca_system_score_codex":0.000021093894,"about_ca_system_score_gemma":0.000005583615,"threshold_uncertainty_score":0.23214199},"labels":[],"label_agreement":null},{"id":"W2024292964","doi":"10.1061/41109(373)90","title":"Developing a Framework for Construction Contractor Qualification for Surety Bonding","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Surety; Process (computing); Construction industry; Risk analysis (engineering); Project management; Construction engineering; Bond; Engineering management; Fuzzy logic; Computer science; Engineering; Business; Systems engineering; Finance; Artificial intelligence","score_opus":0.023282076237972245,"score_gpt":0.2775408541685669,"score_spread":0.25425877793059465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024292964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055458337,0.000012956019,0.94031143,0.00032141065,0.0026458094,0.0004068296,0.000020137866,0.00032650333,0.00049657514],"genre_scores_gemma":[0.5431262,0.0000024831036,0.45631737,0.000032068612,0.00025583396,0.0001817688,0.00002711856,0.000014205706,0.000042939708],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99948347,0.0000037841348,0.0002070069,0.000116501156,0.000052678235,0.00013654577],"domain_scores_gemma":[0.9995143,0.00018181214,0.000040425333,0.00009824534,0.00013310259,0.00003215932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013594593,0.000090003465,0.000095753654,0.00005725257,0.000106572916,0.000056593388,0.000048031416,0.00017960288,0.00004893467],"category_scores_gemma":[0.0001546305,0.000087705164,0.00004615563,0.0000793352,0.000026861373,0.00015545741,0.0000020052455,0.00012762859,0.000004705497],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007727157,0.0000016462652,0.00015243706,0.000030141257,0.000012209772,7.722844e-9,0.000041167772,0.000011484718,0.03387259,0.9057728,0.00022103553,0.05987672],"study_design_scores_gemma":[0.0008022969,0.000036912184,0.0011152541,0.000046525252,0.0000404153,0.000028185048,0.00085311296,0.031060042,0.34262934,0.3985395,0.22431451,0.0005338803],"about_ca_topic_score_codex":0.000003074913,"about_ca_topic_score_gemma":0.000037079197,"teacher_disagreement_score":0.5072333,"about_ca_system_score_codex":0.00003662636,"about_ca_system_score_gemma":0.000027852207,"threshold_uncertainty_score":0.35765126},"labels":[],"label_agreement":null},{"id":"W20251927","doi":"","title":"Accelerated Construction of Bridges: The Path Toward a Holistic Decision-Making System","year":2007,"lang":"en","type":"article","venue":"Transportation Research Board 86th Annual MeetingTransportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Work (physics); Transport engineering; Risk analysis (engineering); Action (physics); Order (exchange); Engineering; Quality (philosophy); State (computer science); Construction engineering; Computer science; Operations research; Business","score_opus":0.057854339021741766,"score_gpt":0.3588176772054708,"score_spread":0.30096333818372906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W20251927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9113176,0.00043688374,0.08191067,0.00019572534,0.0008909735,0.0015315793,0.0003946086,0.0005698999,0.0027520747],"genre_scores_gemma":[0.99397635,0.0002505953,0.004920861,0.000018406437,0.00029354583,0.00021509948,0.0001680721,0.00010143093,0.000055622673],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99158436,0.00053337676,0.0018720105,0.0007259516,0.0038407147,0.0014435755],"domain_scores_gemma":[0.99165714,0.0023499797,0.00023773761,0.0006278102,0.004732957,0.0003943503],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.007409847,0.00042804173,0.0005485561,0.0015248243,0.0008642219,0.00020338473,0.00074658677,0.00043647652,0.00019751639],"category_scores_gemma":[0.00042063583,0.00036892178,0.00025695798,0.0035371701,0.0012018306,0.0007160632,0.000011473311,0.0019454865,0.00007046939],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0069378954,0.00058560865,0.16243549,0.0068400614,0.0009807489,0.0006437453,0.050226815,0.054104213,0.02116083,0.30379617,0.010982729,0.3813057],"study_design_scores_gemma":[0.0028248543,0.0007457643,0.7800478,0.00287326,0.00015554197,0.000020517527,0.16660334,0.014375054,0.01686304,0.0046066437,0.009662706,0.0012214825],"about_ca_topic_score_codex":0.0020499995,"about_ca_topic_score_gemma":0.004115175,"teacher_disagreement_score":0.6176123,"about_ca_system_score_codex":0.00044862434,"about_ca_system_score_gemma":0.0003675997,"threshold_uncertainty_score":0.99987626},"labels":[],"label_agreement":null},{"id":"W2026358429","doi":"10.1108/02632770010315698","title":"The future of workspace management","year":2000,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Software deployment; Variety (cybernetics); Workspace; Work (physics); Facility management; Service (business); Process management; Order (exchange); Space (punctuation); Business; Computer science; Core (optical fiber); Knowledge management; Engineering management; Engineering; Marketing; Telecommunications","score_opus":0.003226411343080875,"score_gpt":0.16431108475683945,"score_spread":0.16108467341375857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026358429","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29140478,0.00938839,0.0018189121,0.0005753955,0.0016023347,0.00016821739,0.00003901357,0.00034953197,0.69465345],"genre_scores_gemma":[0.88915074,0.0021124633,0.00043472167,0.000011750435,0.000121291836,0.000022088918,0.0000032266241,0.000005333079,0.10813836],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99982107,0.0000038189905,0.00005483022,0.000024739802,0.00004601316,0.000049519254],"domain_scores_gemma":[0.9999012,0.000006708997,0.0000031698462,0.00007532606,0.0000069429125,0.0000067012666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000018329669,0.000031415384,0.000027179385,0.0000087075005,0.000033962842,0.000010999692,0.000037517584,0.000016747586,0.0005274042],"category_scores_gemma":[2.4628392e-7,0.000021482565,0.000016996675,0.00003429424,0.00002691321,0.000028972807,0.000001830941,0.0000316049,0.000041387917],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004209483,0.0000010965671,0.000054096225,0.000026401407,0.000019738263,1.5869125e-7,0.00047692008,0.0015182383,0.000007486501,0.05765927,0.010641624,0.92959076],"study_design_scores_gemma":[0.000036518773,0.0000032138673,0.0005390754,0.0000055608393,0.0000020911286,9.4142695e-7,0.0047971564,0.00039520365,0.00018082534,0.0016300578,0.99237835,0.000030991097],"about_ca_topic_score_codex":0.000003166619,"about_ca_topic_score_gemma":0.000020064259,"teacher_disagreement_score":0.9817367,"about_ca_system_score_codex":0.0000067643837,"about_ca_system_score_gemma":0.0000010665484,"threshold_uncertainty_score":0.5774706},"labels":[],"label_agreement":null},{"id":"W2026615304","doi":"10.1108/02632770310500310","title":"Facilities – 20th anniversary issue","year":2003,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"","keywords":"Facility management; Engineering; Business; Architectural engineering; Marketing","score_opus":0.009221766953614253,"score_gpt":0.18419242322267984,"score_spread":0.17497065626906558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026615304","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28031373,0.0022792916,0.0050378777,0.00006771876,0.002239565,0.00013559741,0.00036187656,0.0009437286,0.7086206],"genre_scores_gemma":[0.8759233,0.000078931036,0.00030416835,0.000024370498,0.00005926765,0.000016517139,0.000014625572,0.000009737127,0.12356912],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999513,0.00001880883,0.00011881364,0.000094189025,0.00009591954,0.0001592707],"domain_scores_gemma":[0.9997738,0.000019102281,0.000007449822,0.000127905,0.000033198525,0.000038572627],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004028527,0.00011108602,0.00009607784,0.00006130888,0.000063662774,0.000032966876,0.00004981389,0.00006337824,0.003682026],"category_scores_gemma":[0.000017980297,0.00011143306,0.000043838296,0.00006517763,0.0000734095,0.00020925193,0.0000040188647,0.00009164473,0.00052982295],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004061163,0.000048352806,0.0059966473,0.0010055936,0.00031586646,0.000020446554,0.031144036,0.011313552,0.0039505064,0.4091382,0.44319633,0.093829855],"study_design_scores_gemma":[0.00009505433,0.000016148497,0.000104926345,0.0000059820745,0.0000030155088,0.000011247322,0.013660579,0.0002896304,0.004364159,0.0019216029,0.97938615,0.00014147584],"about_ca_topic_score_codex":0.00005141197,"about_ca_topic_score_gemma":0.000024064271,"teacher_disagreement_score":0.59560955,"about_ca_system_score_codex":0.0000397,"about_ca_system_score_gemma":0.00001622799,"threshold_uncertainty_score":0.99722874},"labels":[],"label_agreement":null},{"id":"W2027536824","doi":"10.1108/09699980910988384","title":"Data acquisition from construction sites for tracking purposes","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Process (computing); Data acquisition; Identification (biology); Software; Tracking system; Data collection; Radio-frequency identification; Systems engineering; Real-time computing; Engineering; Artificial intelligence","score_opus":0.0157010747044208,"score_gpt":0.22204554246731106,"score_spread":0.20634446776289025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027536824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2698327,0.00042822552,0.72288907,0.00029585935,0.0028853442,0.0006960734,0.00028267506,0.0016759816,0.0010140586],"genre_scores_gemma":[0.82819295,0.000058183607,0.17031763,0.000047003577,0.0005486897,0.000047367394,0.00073458464,0.000032996842,0.000020562136],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986021,0.0000148307045,0.0004126244,0.00043689838,0.00020743941,0.00032608834],"domain_scores_gemma":[0.99923563,0.000057939145,0.000067204994,0.00050001784,0.0000540549,0.000085140266],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009828598,0.0003071109,0.00022884471,0.0003057399,0.00014686282,0.000169123,0.00029195164,0.00009711722,0.00007942633],"category_scores_gemma":[0.00001779441,0.00032805357,0.00009061482,0.00026575514,0.000055920398,0.0005023865,0.00004053323,0.00020198645,0.000014473852],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003766417,0.00001118795,0.00015436743,0.00008768613,0.00018635973,0.0000031820134,0.00008347581,0.07114508,0.014090171,0.021940546,0.00046537,0.8917949],"study_design_scores_gemma":[0.002878878,0.0002145334,0.032849766,0.00043189243,0.0004935727,0.0005102226,0.0008448703,0.86651456,0.021669623,0.026474705,0.04514035,0.0019770525],"about_ca_topic_score_codex":0.0000046662763,"about_ca_topic_score_gemma":0.0000057883417,"teacher_disagreement_score":0.88981783,"about_ca_system_score_codex":0.00010381203,"about_ca_system_score_gemma":0.000006775977,"threshold_uncertainty_score":0.99991715},"labels":[],"label_agreement":null},{"id":"W2028972000","doi":"10.9753/icce.v33.management.30","title":"COASTAL ENGINEERING EDUCATION AND COASTAL MODELS","year":2012,"lang":"en","type":"article","venue":"Coastal Engineering Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Coastal engineering; Coastal management; Order (exchange); Oceanography; Environmental resource management; Computer science; Engineering; Environmental science; Geology; Business","score_opus":0.007127495352082786,"score_gpt":0.18523064895516142,"score_spread":0.17810315360307863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028972000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8915924,0.0017315298,0.08931053,0.000067381516,0.0036173896,0.00042653532,0.000065837165,0.0024245325,0.010763904],"genre_scores_gemma":[0.99314004,0.00006194231,0.005788989,0.00001869782,0.0005912226,0.00008204493,0.000025102483,0.00009385684,0.00019809346],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987843,0.0000014060703,0.00028731997,0.00021001164,0.0002061816,0.0005108],"domain_scores_gemma":[0.9994979,0.000019035626,0.000035511064,0.000092006805,0.000108421824,0.00024712028],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012007984,0.00033774608,0.00021997886,0.00024627647,0.000066551416,0.00012646578,0.00010754886,0.00015861815,0.000017564184],"category_scores_gemma":[0.000034855086,0.00038021887,0.00005985102,0.00028022312,0.00003153198,0.0013502825,0.000069288166,0.00032839298,0.000015057854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000070939146,0.00038674267,0.013871001,0.004563364,0.0004473173,0.0000039269503,0.008823944,0.16871576,0.23128283,0.42864412,0.010391971,0.13279809],"study_design_scores_gemma":[0.0006101924,0.000072403614,0.0064379903,0.00043745912,0.00008111982,0.0005943023,0.001115088,0.9494302,0.012014421,0.00032694728,0.027538149,0.0013416719],"about_ca_topic_score_codex":0.000011388128,"about_ca_topic_score_gemma":0.0000057742113,"teacher_disagreement_score":0.7807145,"about_ca_system_score_codex":0.00004790543,"about_ca_system_score_gemma":0.00002698367,"threshold_uncertainty_score":0.999865},"labels":[],"label_agreement":null},{"id":"W2029178229","doi":"10.1108/09699980410558575","title":"Innovative 3D‐modelling for selecting and locating mobile cranes","year":2004,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Concordia University","funders":"","keywords":"Lift (data mining); Animation; Computer science; Selection (genetic algorithm); Graphics; Industrial engineering; Engineering; Systems engineering; Data mining; Artificial intelligence; Computer graphics (images)","score_opus":0.005183567148387535,"score_gpt":0.18664152059786188,"score_spread":0.18145795344947435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029178229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31241375,0.00015053483,0.6856334,0.000024690342,0.00055053586,0.00037345104,0.0000030354895,0.0004845486,0.00036603978],"genre_scores_gemma":[0.75873095,0.000022749617,0.24087045,0.000010042486,0.00012343962,0.00018890467,0.000008739522,0.000029552266,0.000015196449],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912095,0.00000520987,0.00027816618,0.000228688,0.00010686843,0.00026011813],"domain_scores_gemma":[0.9997015,0.000036406607,0.000039492148,0.00010452269,0.000069964386,0.00004809392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008827689,0.00021203337,0.00015302536,0.0002668818,0.00014584654,0.00007222716,0.000062773215,0.000051386636,0.0000061741566],"category_scores_gemma":[0.000009176394,0.00022311824,0.00003694464,0.0003970111,0.00004495034,0.00014488822,0.00002255645,0.00018300032,0.0000023592672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052080154,0.0000022069273,0.00003213247,0.00018854464,0.00006408103,5.84822e-7,0.00028523535,0.8181872,0.0013558664,0.013574141,0.0000020524049,0.16630276],"study_design_scores_gemma":[0.0015132632,0.00010913508,0.000373562,0.00033237063,0.00006626293,0.0003638073,0.0012360711,0.9765406,0.009836389,0.0038145203,0.0050329487,0.0007810697],"about_ca_topic_score_codex":0.00000933753,"about_ca_topic_score_gemma":0.0000028366778,"teacher_disagreement_score":0.44631717,"about_ca_system_score_codex":0.00010586435,"about_ca_system_score_gemma":0.000007363343,"threshold_uncertainty_score":0.90984976},"labels":[],"label_agreement":null},{"id":"W2030212035","doi":"10.1016/j.autcon.2012.12.004","title":"Building Information Modeling (BIM) partnering framework for public construction projects","year":2013,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":473,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Department for Business, Innovation and Skills","keywords":"Building information modeling; Procurement; Rework; Construction industry; Integrated project delivery; Construction management; Productivity; Competition (biology); Pre-construction services; Process management; Project management; Business; Construction engineering; Engineering; Operations management; Project planning; Systems engineering; Marketing; Civil engineering","score_opus":0.022112080141336317,"score_gpt":0.24119654176182134,"score_spread":0.21908446162048503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030212035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30195644,0.00002971447,0.69393694,0.00017425483,0.0017108843,0.00070910103,0.000005792618,0.0007615801,0.0007153067],"genre_scores_gemma":[0.7236932,0.000022205608,0.2753949,0.000028993558,0.00014796719,0.00064452336,0.000046215748,0.00002017951,0.0000018492885],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984481,0.000037357164,0.000747136,0.0002056905,0.00021939335,0.00034232004],"domain_scores_gemma":[0.9991759,0.00008262956,0.00015590322,0.00019900891,0.00031205232,0.00007450931],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021073362,0.00022675507,0.00020705842,0.0006596966,0.00018865537,0.00037119116,0.000104020444,0.0002939878,0.000105586965],"category_scores_gemma":[0.00018553581,0.00025556915,0.00007490716,0.0006079029,0.00007335545,0.003973675,0.000014828199,0.0002701378,0.000055754666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058986143,0.0000069103194,0.0016427952,0.00013724287,0.000024869423,7.316034e-8,0.0002672102,0.05292076,0.000975765,0.48404333,0.000084833264,0.4598903],"study_design_scores_gemma":[0.00041755254,0.000017220797,0.0005476911,0.00010688732,0.000010284096,0.00006171816,0.0012043319,0.8987951,0.0015970787,0.09628364,0.00069133466,0.00026711152],"about_ca_topic_score_codex":0.000043602482,"about_ca_topic_score_gemma":0.000012233122,"teacher_disagreement_score":0.84587437,"about_ca_system_score_codex":0.00029105536,"about_ca_system_score_gemma":0.0000627947,"threshold_uncertainty_score":0.9999896},"labels":[],"label_agreement":null},{"id":"W2031303073","doi":"10.1089/ees.2010.2707","title":"<i>Selected Proceedings from IT3:</i> The International Conference on Thermal Treatment Technologies &amp; Hazardous Waste Combustors, Montreal, Canada, May 12–16, 2008, and Cincinnati, Ohio, May 12–22, 2009 <i>Guest Editor: Paul M. Lemieux, Ph.D.</i> Introduction","year":2010,"lang":"en","type":"article","venue":"Environmental Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hazardous waste; Library science; Download; Waste management; Engineering; Environmental science; Computer science","score_opus":0.0038244221099251793,"score_gpt":0.16144252567066747,"score_spread":0.1576181035607423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031303073","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9880593,0.00015545503,0.00021084005,0.0016285508,0.0079516135,0.00025872918,0.00016406244,0.0003383106,0.0012331379],"genre_scores_gemma":[0.99721336,0.00018728113,0.0003609655,0.000029273151,0.0017651924,0.000055750545,0.00006146088,0.000025867801,0.00030083527],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99835414,0.000005564383,0.00025640655,0.00045306608,0.0005933527,0.00033746727],"domain_scores_gemma":[0.9994804,0.00003801646,0.0000749702,0.00028381782,0.00003160022,0.00009117821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014370815,0.00030353692,0.00017141578,0.00012785954,0.00022764265,0.00018745483,0.00046080805,0.00011616066,0.00010494988],"category_scores_gemma":[0.000054435866,0.00023829947,0.000029245397,0.0001878102,0.0003387091,0.0003739198,0.000070513175,0.00045478164,0.000009757591],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020259196,0.000058510122,0.002439849,0.000006412801,0.000050446255,0.0000025416819,0.00022445536,0.010023855,0.93431866,0.0004071606,0.04066122,0.011786622],"study_design_scores_gemma":[0.0010458826,0.00018847344,0.029203232,0.000055778226,0.0000597784,0.00013210089,0.0014452626,0.059382003,0.6449456,0.000083183324,0.2624239,0.0010348159],"about_ca_topic_score_codex":0.0052069942,"about_ca_topic_score_gemma":0.02099258,"teacher_disagreement_score":0.28937307,"about_ca_system_score_codex":0.0006459798,"about_ca_system_score_gemma":0.00007129626,"threshold_uncertainty_score":0.99687177},"labels":[],"label_agreement":null},{"id":"W2032593626","doi":"10.1109/simul.2010.36","title":"Simulation-Based Scheduling of Modular Construction Using Multi-agent Resource Allocation","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"","keywords":"Computer science; Modular design; Scheduling (production processes); Distributed computing; Processor scheduling; Resource allocation; Resource (disambiguation); Computer network; Engineering; Operating system; Operations management","score_opus":0.018094440133185306,"score_gpt":0.24313558914500336,"score_spread":0.22504114901181804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032593626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47476622,0.00000926528,0.52454567,0.0000083691,0.00029415963,0.000058884652,0.0000012931157,0.00010528427,0.0002108387],"genre_scores_gemma":[0.841945,4.4870956e-7,0.15795295,0.000010496695,0.000055068496,0.0000031379025,0.000010121109,0.000012451881,0.000010314705],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994536,0.000011787078,0.00023682103,0.0001013859,0.000110708024,0.00008570036],"domain_scores_gemma":[0.99959373,0.000051647592,0.000049421735,0.00015059934,0.00012002208,0.00003457341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008245406,0.0000869959,0.00008530731,0.000115632276,0.000053916014,0.000017664155,0.00004509994,0.00010417205,0.00012383536],"category_scores_gemma":[0.000054222564,0.00008970409,0.00004176042,0.00014738204,0.000052377538,0.000115080606,0.0000038739845,0.00013646198,0.000005416397],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022547504,0.000006658992,0.0010571968,0.00001444802,0.000007478927,5.3581115e-8,0.000025006437,0.78691995,0.2037627,0.0017206197,6.1626173e-7,0.0064830175],"study_design_scores_gemma":[0.00022133243,0.0000042424094,0.0004193125,0.000012024352,0.000011582752,0.0000014371572,0.00010506345,0.914264,0.08453471,0.000054806733,0.00028647753,0.000084999316],"about_ca_topic_score_codex":0.000026147443,"about_ca_topic_score_gemma":0.000023563236,"teacher_disagreement_score":0.36717877,"about_ca_system_score_codex":0.000028462468,"about_ca_system_score_gemma":0.00002374468,"threshold_uncertainty_score":0.36580265},"labels":[],"label_agreement":null},{"id":"W2032824002","doi":"10.4018/ij3dim.2014100104","title":"Using Building Information Modeling to Evaluate the Costs and Benefits of Adopting Sustainable Universal Houses in Canada","year":2014,"lang":"en","type":"article","venue":"International Journal of 3-D Information Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Sustainability; Building information modeling; Risk analysis (engineering); Computer science; Process (computing); Compatibility (geochemistry); Universal design; Population; Construction engineering; Systems engineering; Architectural engineering; Engineering; Business","score_opus":0.013949376779782368,"score_gpt":0.22422587031050625,"score_spread":0.2102764935307239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032824002","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.549246,0.000028521057,0.45012712,0.00007021992,0.0002851135,0.00005071092,0.0000029238272,0.000006340336,0.00018304016],"genre_scores_gemma":[0.99309546,0.000043560707,0.006680312,0.000106233245,0.00006354936,0.0000013480263,0.0000036301017,0.0000053757294,5.055698e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985753,0.000022521961,0.0007799475,0.000032955315,0.00045831795,0.00013094343],"domain_scores_gemma":[0.99852836,0.000046466193,0.00019027988,0.00005595389,0.0011319444,0.000046969333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005741126,0.00009407737,0.00012674647,0.0004636768,0.000059467697,0.00011168841,0.00018540249,0.000036269492,0.000004223082],"category_scores_gemma":[0.000179503,0.000081832084,0.00002925538,0.00016072074,0.000008022528,0.003117975,0.00003792931,0.00017061534,5.221554e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024393543,0.0000010514219,0.0002509357,0.000017810513,0.000019940575,1.901324e-7,0.00093327346,0.96638954,0.000072926516,0.0055199284,0.000007724274,0.026762275],"study_design_scores_gemma":[0.00036719147,0.000011701062,0.00007142329,0.00017808871,0.000010207864,0.00003911002,0.005283359,0.9932395,0.00032008014,0.00020798846,0.00019211552,0.00007919467],"about_ca_topic_score_codex":0.042916007,"about_ca_topic_score_gemma":0.0068406668,"teacher_disagreement_score":0.44384947,"about_ca_system_score_codex":0.0007816942,"about_ca_system_score_gemma":0.00027139843,"threshold_uncertainty_score":0.9634573},"labels":[],"label_agreement":null},{"id":"W2034099894","doi":"10.1145/1094855.1094872","title":"Agile environments...","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Professional Engineers Ontario","funders":"","keywords":"Agile software development; Work (physics); Culture change; Organizational culture; Business; Restructuring; Sample (material); Engineering; Engineering management; Operations management; Computer science; Knowledge management; Process management; Management; Software engineering; Finance; Sociology","score_opus":0.004107342676813589,"score_gpt":0.16599578985404737,"score_spread":0.16188844717723377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034099894","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09532846,0.00015937065,0.07466323,0.00019272679,0.00029547294,0.000037995946,0.0000010763208,0.0003429667,0.8289787],"genre_scores_gemma":[0.9930359,0.000015972522,0.0017582824,0.000055814733,0.00007130819,0.000003064768,0.000001223586,0.000003442535,0.005054993],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99988264,8.621531e-7,0.00003417862,0.00002324794,0.00002381757,0.000035246157],"domain_scores_gemma":[0.99994814,0.0000013316643,0.0000015617719,0.00003640438,7.242067e-7,0.000011845496],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000063022735,0.00002226372,0.00001549889,0.000009981177,0.000008490742,0.000004434253,0.000014405079,0.000014450881,0.0019077607],"category_scores_gemma":[3.0612264e-7,0.00001988266,0.000008391226,0.000013177953,0.0000048241277,0.000053311956,0.0000013894496,0.000021264157,0.0007710535],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.9394324e-7,0.0000074568457,0.00038265006,0.000001986895,0.000011458132,1.8321225e-7,0.00006218754,0.009823678,0.034663323,0.030803358,0.027325315,0.8969178],"study_design_scores_gemma":[0.0000503164,0.0000020287027,0.0006424674,6.2889103e-7,0.0000012303715,0.0000030887463,0.000021064283,0.019525956,0.044860445,0.00012425854,0.93472487,0.000043676446],"about_ca_topic_score_codex":7.318039e-7,"about_ca_topic_score_gemma":0.0000044393437,"teacher_disagreement_score":0.90739954,"about_ca_system_score_codex":0.000013472617,"about_ca_system_score_gemma":5.1625193e-7,"threshold_uncertainty_score":0.9990046},"labels":[],"label_agreement":null},{"id":"W2034659495","doi":"10.1108/ecam-02-2012-0015","title":"A case productivity model for automatic climbing system","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada); Concordia University","funders":"","keywords":"Productivity; Formwork; Bottleneck; Originality; Engineering; Scheduling (production processes); Benchmarking; Futures studies; Industrial engineering; Computer science; Operations research; Operations management; Civil engineering; Artificial intelligence; Business","score_opus":0.006901710517178255,"score_gpt":0.1804127465982569,"score_spread":0.17351103608107865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034659495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2752103,0.000018477813,0.72068936,0.000028858374,0.0012261644,0.00046712838,0.000006195561,0.0014863127,0.0008671861],"genre_scores_gemma":[0.8856649,0.0000012342341,0.11377282,0.000005289931,0.00018591453,0.00026189117,0.0000070364367,0.000040089817,0.00006081516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989606,0.000016974494,0.00031613928,0.0002725325,0.00013554204,0.00029818734],"domain_scores_gemma":[0.9995339,0.000039611215,0.0000447322,0.00026742512,0.000037910606,0.0000764263],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018790872,0.00024201916,0.00020310003,0.0002643431,0.00014321982,0.000070878894,0.00009007426,0.000056550783,0.000005176473],"category_scores_gemma":[0.000018131406,0.00024633438,0.00010105612,0.00018893069,0.000034270393,0.00013762563,0.000025825453,0.00015528407,0.000007827814],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037079246,0.0000030806766,0.000010624275,0.00077315886,0.00006800174,0.000006942904,0.000109446846,0.69225943,0.00038477257,0.04364638,0.000026580301,0.26270786],"study_design_scores_gemma":[0.00034723437,0.000018341649,0.000055029806,0.0000877839,0.000057675174,0.0025560972,0.0001280005,0.99504256,0.0004769732,0.0003987178,0.00056247663,0.0002691284],"about_ca_topic_score_codex":0.000002888199,"about_ca_topic_score_gemma":0.0000045046418,"teacher_disagreement_score":0.6104546,"about_ca_system_score_codex":0.00015917531,"about_ca_system_score_gemma":0.0000047733774,"threshold_uncertainty_score":0.99999887},"labels":[],"label_agreement":null},{"id":"W2035798461","doi":"10.5555/2429759.2430169","title":"Integrating discrete event simulation (DES) and system dynamics (SD) on single platform for simulating construction operations","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Discrete event simulation; Computer science; Context (archaeology); Interfacing; System dynamics; Industrial engineering; Simulation modeling; Synchronization (alternating current); Operations research; Event (particle physics); Systems engineering; Simulation; Engineering; Artificial intelligence","score_opus":0.02973839544439359,"score_gpt":0.2682123121038019,"score_spread":0.23847391665940834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035798461","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2681814,0.00002981283,0.7283667,0.000018165578,0.000774606,0.0004110395,0.000041123738,0.0002968134,0.0018803566],"genre_scores_gemma":[0.9914564,0.0000018513448,0.007945994,0.00002076229,0.00028454093,0.00005546107,0.00013576058,0.000039029197,0.000060206898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998723,0.00003533258,0.0005287091,0.00023665631,0.00017374466,0.00030256333],"domain_scores_gemma":[0.9990109,0.0003147285,0.00009326818,0.00018261619,0.00028324,0.000115244824],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019003298,0.00026375774,0.0002184007,0.0001665884,0.0003303753,0.00020635183,0.000072093004,0.00015613403,0.000038380414],"category_scores_gemma":[0.00012332038,0.00025497924,0.00007554064,0.00014770952,0.000085112995,0.0009903371,0.0000201578,0.00018125384,0.000011164537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028077382,0.000013787857,0.0011849136,0.00008978769,0.000026731255,7.9053564e-8,0.00091740105,0.8707355,0.000573874,0.054017644,0.0000023589507,0.072409794],"study_design_scores_gemma":[0.00046025758,0.0000873165,0.00056801527,0.00026713032,0.00003473444,0.000007993217,0.0020957903,0.9948563,0.0006936764,0.000428889,0.00022842818,0.0002714943],"about_ca_topic_score_codex":0.000010836834,"about_ca_topic_score_gemma":0.00008214728,"teacher_disagreement_score":0.72327495,"about_ca_system_score_codex":0.00039473054,"about_ca_system_score_gemma":0.000017792438,"threshold_uncertainty_score":0.9999902},"labels":[],"label_agreement":null},{"id":"W2036087515","doi":"10.1108/14630010210811840","title":"Strategic facility management and technology: The case study of the University of Calgary","year":2002,"lang":"en","type":"article","venue":"Journal of Corporate Real Estate","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy","funders":"","keywords":"Facility management; Business; Strategic planning; Order (exchange); Engineering management; University campus; Process management; Operations management; Marketing; Finance; Computer science; Engineering; Library science","score_opus":0.025296048185912027,"score_gpt":0.18716332774159958,"score_spread":0.16186727955568755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036087515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9970659,0.00005160639,0.0001710604,0.000042601037,0.00008030089,0.00009288646,0.0000035451928,0.000008163185,0.0024839395],"genre_scores_gemma":[0.9988748,0.0010041726,0.00006318001,6.394384e-7,0.000003133478,1.4390584e-7,8.26489e-8,0.0000019398144,0.000051913816],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99960995,0.00003811098,0.00018596588,0.000036887875,0.000082463666,0.000046641806],"domain_scores_gemma":[0.9995366,0.000012210478,0.00023016776,0.00010753454,0.000095679155,0.000017834454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011596273,0.00005114492,0.000101994294,0.00005985242,0.000051353865,0.0000051336165,0.00008661459,0.000027351212,0.000011618495],"category_scores_gemma":[0.0000015588126,0.00003078598,0.000024847837,0.00021637016,0.000112375834,0.00005731461,0.000018240904,0.00014636923,4.3325053e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013400326,0.00047484026,0.054466255,0.00029346472,0.0008963561,0.0038025414,0.0075451396,0.01414219,0.0023299907,0.0055667986,0.0005341646,0.90981424],"study_design_scores_gemma":[0.011633764,0.0036570227,0.122735545,0.00051271677,0.00195621,0.02503378,0.62130356,0.1803983,0.004235758,0.024811227,0.0027344588,0.0009876618],"about_ca_topic_score_codex":0.00012508023,"about_ca_topic_score_gemma":0.00023240778,"teacher_disagreement_score":0.9088266,"about_ca_system_score_codex":0.000018352139,"about_ca_system_score_gemma":0.000007983946,"threshold_uncertainty_score":0.12554158},"labels":[],"label_agreement":null},{"id":"W2036178893","doi":"10.1061/(asce)0733-9364(2001)127:4(330)","title":"Improving Design Coordination for Building Projects. II: A Collaborative System","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Process (computing); The Internet; Domain (mathematical analysis); Collaborative design; Information sharing; Building information modeling; Design technology; Systems design; Systems engineering; Engineering management; Knowledge management; Software engineering; World Wide Web; Engineering","score_opus":0.006750662511390033,"score_gpt":0.19213729165913487,"score_spread":0.18538662914774484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036178893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025097236,0.00039634365,0.9724535,0.00005105679,0.0013171019,0.00031027646,0.0000016610984,0.000122924,0.00024992716],"genre_scores_gemma":[0.78971523,0.00024374065,0.20972282,0.000005134653,0.00020075247,0.000045212742,8.3042374e-7,0.00001932967,0.0000469355],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936813,0.000010212439,0.000312121,0.0000801871,0.00011060797,0.00011872199],"domain_scores_gemma":[0.9995799,0.000025302405,0.00011854937,0.000051121202,0.00017941359,0.000045715322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023709095,0.000114178045,0.00015146025,0.0003171072,0.00009523037,0.000055995886,0.00004444096,0.00004759005,0.0000017245657],"category_scores_gemma":[0.000014670132,0.000110495945,0.000041333522,0.00022774558,0.000015874437,0.00034484453,0.000009385077,0.00008438495,1.9763968e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121049605,0.000018579987,0.000061062136,0.0011328161,0.00048971246,0.000020896226,0.00034218226,0.38554695,0.02086149,0.1443434,0.0008569515,0.4462049],"study_design_scores_gemma":[0.0017487064,0.00027066207,0.00015833539,0.0004232943,0.000206011,0.0014422204,0.003023812,0.95043343,0.0055535007,0.00018987524,0.03623406,0.0003160701],"about_ca_topic_score_codex":6.868463e-7,"about_ca_topic_score_gemma":1.9472263e-7,"teacher_disagreement_score":0.76461804,"about_ca_system_score_codex":0.0001303297,"about_ca_system_score_gemma":0.000013581451,"threshold_uncertainty_score":0.4505894},"labels":[],"label_agreement":null},{"id":"W2037640517","doi":"10.1061/41109(373)5","title":"Automated Materials Tracking and Locating: Impact Modeling and Estimation","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Global Positioning System; Computer science; Schedule; Supply chain; Software; Tracking system; Automation; Productivity; Track (disk drive); Systems engineering; Field (mathematics); Tracking (education); Yard; Visibility; Software engineering; Real-time computing; Engineering; Kalman filter; Artificial intelligence; Telecommunications","score_opus":0.009000092575239418,"score_gpt":0.24431604165257725,"score_spread":0.23531594907733783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037640517","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.942676,0.000020187525,0.05586205,0.000013708156,0.00017190029,0.00004142696,0.0000015527742,0.000600492,0.00061264815],"genre_scores_gemma":[0.9928008,0.0000058208825,0.007139746,0.000004519987,0.000026921769,0.0000033262297,0.0000050908216,0.000008125332,0.000005686653],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997449,0.0000034701293,0.00010123794,0.000058381196,0.000030413343,0.00006157893],"domain_scores_gemma":[0.99989134,0.000007616134,0.000009772505,0.000043025622,0.000020358872,0.000027863203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059021433,0.000059345526,0.000056440374,0.00003743033,0.000037619302,0.00009669715,0.000012739249,0.00005263301,0.000071225746],"category_scores_gemma":[0.0000123015625,0.000049211445,0.0000057094544,0.00003166687,0.000011794433,0.00019015168,0.0000036965373,0.000053865948,0.0000027333913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032647824,0.0000027929448,0.00048245973,0.00004489107,0.000016079839,2.8046972e-7,0.00027587282,0.06321334,0.8283282,0.0045221937,0.000055688604,0.10305491],"study_design_scores_gemma":[0.00007012819,0.000004449454,0.0009762659,0.000007993548,0.000004238617,0.000034642573,0.00003727078,0.9727053,0.025625326,0.0004726506,0.0000031447692,0.000058578844],"about_ca_topic_score_codex":0.000048050017,"about_ca_topic_score_gemma":0.000018224855,"teacher_disagreement_score":0.90949196,"about_ca_system_score_codex":0.0000057247616,"about_ca_system_score_gemma":0.0000040612645,"threshold_uncertainty_score":0.20067845},"labels":[],"label_agreement":null},{"id":"W2038212705","doi":"10.1061/40937(261)35","title":"Sensitivity Analysis of Construction Simulation Considering Site Layout Patterns","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"DEVS; Sensitivity (control systems); Computer science; Animation; Simulation modeling; Discrete event simulation; Modeling and simulation; Simulation; Data mining; Engineering; Computer graphics (images); Electronic engineering","score_opus":0.01034676925464319,"score_gpt":0.23098678072830184,"score_spread":0.22064001147365864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038212705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5448508,0.0000049760247,0.4532173,0.0000025900147,0.00012851908,0.000025026085,0.0000083459745,0.00010013304,0.0016623029],"genre_scores_gemma":[0.9973725,0.000002685281,0.0025375644,0.000011278833,0.0000312624,5.4594386e-7,0.000022945986,0.0000063107423,0.000014908614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946666,0.0000129973305,0.00023824602,0.00008769478,0.000098022305,0.00009638775],"domain_scores_gemma":[0.9996418,0.00010334389,0.00004041519,0.00010289204,0.000081122234,0.000030425674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017341918,0.00007446498,0.00014522107,0.00030937002,0.000025430894,0.000011519467,0.000011944985,0.00006450934,0.00017562477],"category_scores_gemma":[0.000013416185,0.000076054275,0.00007790487,0.00040560932,0.000028969185,0.00012159865,0.0000046186706,0.00006153103,0.0000053697304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052665505,0.00000397637,0.2539787,0.000012817095,0.00024183623,0.0000014963797,0.00015370222,0.7055219,0.012231771,0.0017792805,0.0000036328843,0.026065642],"study_design_scores_gemma":[0.00009071186,0.000004637031,0.173982,0.0000062914196,0.00018816027,0.0000061213777,0.0003073003,0.8031916,0.022011174,0.000040931198,0.000078576224,0.00009253307],"about_ca_topic_score_codex":0.00011341016,"about_ca_topic_score_gemma":0.001333729,"teacher_disagreement_score":0.45252168,"about_ca_system_score_codex":0.000032890614,"about_ca_system_score_gemma":0.0000040477703,"threshold_uncertainty_score":0.31014034},"labels":[],"label_agreement":null},{"id":"W2038591776","doi":"10.1016/j.asej.2014.09.006","title":"Reducing the operational energy demand in buildings using building information modeling tools and sustainability approaches","year":2014,"lang":"en","type":"article","venue":"Ain Shams Engineering Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Sustainability; Building information modeling; Architectural engineering; Energy consumption; Energy demand; Engineering; Efficient energy use; Sustainable design; Energy analysis; Energy modeling; Architecture; Energy (signal processing); Environmental economics; Civil engineering; Operations management","score_opus":0.013488662266586357,"score_gpt":0.19523871004702306,"score_spread":0.1817500477804367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038591776","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37624222,0.000169289,0.62318975,0.00007537213,0.00017269477,0.00004382842,7.346303e-7,0.000041563544,0.00006452441],"genre_scores_gemma":[0.9877137,0.000039817143,0.01196407,0.000024385927,0.00022677673,0.000010781823,0.0000032305163,0.000015133276,0.0000021165874],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991014,0.000033246764,0.00039177772,0.00009544068,0.00015356297,0.00022457528],"domain_scores_gemma":[0.9996483,0.000071375296,0.00004154477,0.00009567898,0.00008262795,0.000060500366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000791354,0.00014579804,0.00013143399,0.00020176083,0.00017623458,0.0003962961,0.00009864328,0.00008270135,0.0000053390772],"category_scores_gemma":[0.00020035068,0.00012240194,0.000037320646,0.00018625005,0.000020480882,0.0013050723,0.00002391113,0.0003458029,2.6055915e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026607265,0.0000021273067,0.000192585,0.000030225578,0.000010895435,3.1140607e-7,0.00035614014,0.9585742,0.0005045121,0.014152341,0.000008360475,0.026165647],"study_design_scores_gemma":[0.00018988218,0.000008344546,0.00028872822,0.000068702146,0.000007584214,0.00020686677,0.00024040087,0.99688685,0.00029936098,0.0009269804,0.0007350829,0.00014123943],"about_ca_topic_score_codex":0.000028001275,"about_ca_topic_score_gemma":0.0000017853254,"teacher_disagreement_score":0.6114715,"about_ca_system_score_codex":0.0002286801,"about_ca_system_score_gemma":0.00003723054,"threshold_uncertainty_score":0.4991406},"labels":[],"label_agreement":null},{"id":"W2038899743","doi":"10.1108/14714170410815024","title":"Survey of information technology applications in construction","year":2004,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Key (lock); Computer science; Data science; Engineering management; Systems engineering; Knowledge management; Engineering; Computer security","score_opus":0.00838549975092018,"score_gpt":0.2136044261473876,"score_spread":0.2052189263964674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038899743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.567752,0.000048907274,0.42857435,0.000062357496,0.00066815736,0.00031429357,0.00003476407,0.00028699223,0.0022581734],"genre_scores_gemma":[0.98588055,0.000028191305,0.0136802895,0.000010659678,0.000023850951,0.00009425464,0.0002702516,0.000009720332,0.0000022167185],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99883103,0.000016692247,0.00076522934,0.00011440737,0.00013917382,0.00013345438],"domain_scores_gemma":[0.998973,0.000018463394,0.00019655365,0.0001853028,0.00061008695,0.000016564873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000191098,0.0001306185,0.00016741392,0.0017170521,0.000057486734,0.000023811966,0.000088421344,0.00021633053,0.000030964915],"category_scores_gemma":[0.000077961224,0.00014840758,0.000019124967,0.004868146,0.00022935221,0.0007598596,0.000010381642,0.00020420687,0.000018882083],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000100218895,0.000015043209,0.08597936,0.00005086772,0.000016064372,7.180239e-8,0.00008825004,0.0075092,0.003877916,0.68023646,0.000019293948,0.22219746],"study_design_scores_gemma":[0.004385638,0.00012993306,0.5640869,0.00022690554,0.000036404726,0.00024301391,0.0041880812,0.004850598,0.17406927,0.24073002,0.0059903646,0.0010628707],"about_ca_topic_score_codex":0.000084472944,"about_ca_topic_score_gemma":0.00008877184,"teacher_disagreement_score":0.47810754,"about_ca_system_score_codex":0.00018444189,"about_ca_system_score_gemma":0.0000932563,"threshold_uncertainty_score":0.6051885},"labels":[],"label_agreement":null},{"id":"W2041525256","doi":"10.1139/l03-006","title":"Constraint-based genetic algorithm for earthmoving fleet selection","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tournament selection; Crossover; Genetic algorithm; Computer science; Normalization (sociology); Selection (genetic algorithm); Fitness proportionate selection; Algorithm; Roulette; Ranking (information retrieval); Context (archaeology); Chromosome; Mathematical optimization; Fitness function; Artificial intelligence; Machine learning; Mathematics","score_opus":0.005276082128401014,"score_gpt":0.16784105657834475,"score_spread":0.16256497444994372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041525256","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0061510056,0.00065924064,0.99061805,0.000015769001,0.0013838513,0.00007881322,0.000010777066,0.000042286607,0.0010402054],"genre_scores_gemma":[0.9555424,0.0000052013124,0.044193912,0.00001980702,0.00018244813,0.0000063235343,0.0000013843813,0.000030471065,0.000018078023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935925,0.000008530377,0.00025939906,0.0000609187,0.00007137879,0.00024051573],"domain_scores_gemma":[0.99946684,0.00003395292,0.000040613548,0.000051809093,0.00013474675,0.00027204564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012793587,0.00011399771,0.00013269058,0.00033122016,0.000056465935,0.000052774853,0.000057904977,0.00007545436,0.00016728675],"category_scores_gemma":[0.00006421307,0.00012882077,0.00008578325,0.00016528103,0.000017556147,0.00010389923,4.06087e-7,0.00016924983,0.0000019912013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.3101477e-7,0.0000021525977,0.00038095252,0.000047602563,0.000059926246,0.000013359591,0.00005743156,0.93809557,0.0021602367,0.0015957694,0.00095626607,0.056629773],"study_design_scores_gemma":[0.00062294764,0.000077306955,0.00061841233,0.000117531075,0.000038671904,0.0006035516,0.00006789023,0.91917694,0.0073667085,0.00019059452,0.07083771,0.0002817175],"about_ca_topic_score_codex":0.00004111561,"about_ca_topic_score_gemma":0.007832138,"teacher_disagreement_score":0.94939137,"about_ca_system_score_codex":0.00015554328,"about_ca_system_score_gemma":0.00036624033,"threshold_uncertainty_score":0.5253158},"labels":[],"label_agreement":null},{"id":"W2042378286","doi":"10.1109/simul.2010.15","title":"Integrated Simulation-Based Look-Ahead Scheduling for Steel Fabrication Projects","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Doors; Computer science; Systems engineering; Architecture; Industrial engineering; Dynamic priority scheduling; Distributed computing; Engineering; Manufacturing engineering","score_opus":0.018092592152540766,"score_gpt":0.2486628561256225,"score_spread":0.23057026397308172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042378286","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18627137,0.0000083716195,0.8083919,0.000059865044,0.00080836064,0.00034841383,0.000007046439,0.0005289114,0.0035757348],"genre_scores_gemma":[0.9558371,4.4748487e-7,0.043575857,0.000045430665,0.00013408625,0.00009344587,0.000061734936,0.000019390152,0.00023256565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950373,0.0000056372164,0.00017383698,0.00012361952,0.00007495866,0.000118245465],"domain_scores_gemma":[0.9994369,0.00011895875,0.00002535124,0.0001390735,0.00024289254,0.00003679972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000075956494,0.00010120407,0.000077706936,0.000104287305,0.000064645894,0.00004993153,0.000058336245,0.00010998227,0.00014915506],"category_scores_gemma":[0.0001277577,0.00009028753,0.00004307266,0.00017104067,0.00002051073,0.00014032428,0.0000021635933,0.00014988123,0.000027679991],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023996237,0.00002829127,0.0014889484,0.00006735518,0.000025254978,1.0394388e-7,0.00010279879,0.7216658,0.13269866,0.018838152,0.000505004,0.12455566],"study_design_scores_gemma":[0.00028340318,0.000014624674,0.00026359173,0.000008710337,0.000008403357,3.7200337e-7,0.00009823758,0.95991087,0.03227969,0.0002862672,0.0067311847,0.00011462452],"about_ca_topic_score_codex":0.00001400103,"about_ca_topic_score_gemma":0.000101050275,"teacher_disagreement_score":0.7695657,"about_ca_system_score_codex":0.000028418817,"about_ca_system_score_gemma":0.000049542763,"threshold_uncertainty_score":0.36818188},"labels":[],"label_agreement":null},{"id":"W2043222413","doi":"10.1061/(asce)0733-9364(2008)134:8(653)","title":"New Mathematical Optimization Model for Construction Site Layout","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Adjacency list; Object (grammar); Process (computing); Function (biology); Visibility; Genetic algorithm; Orientation (vector space); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics; Machine learning","score_opus":0.00806788335009506,"score_gpt":0.18390310381856115,"score_spread":0.17583522046846609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043222413","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011575991,0.00014690729,0.9867235,0.00004986012,0.00075815496,0.00013729795,0.0000029132184,0.000098051554,0.0005073439],"genre_scores_gemma":[0.12717131,0.00077040854,0.87158096,0.000011217787,0.00021314349,0.000009443403,0.0000033735917,0.000024016055,0.00021611826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992954,0.0000039876404,0.00037127445,0.000079337646,0.0001354228,0.00011458701],"domain_scores_gemma":[0.9996482,0.000015660975,0.00008786491,0.000069436246,0.00008912637,0.000089721936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008030337,0.00012393063,0.00017165196,0.00024129944,0.000060334933,0.000028587574,0.000041980355,0.000063649495,0.000020365365],"category_scores_gemma":[0.000009791865,0.00012185827,0.000061105566,0.00010420007,0.000032793767,0.00025787135,0.000007592735,0.0000994667,0.0000013024465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012723864,0.000003836379,0.000024182222,0.0001076584,0.00007139816,0.000002142419,0.00010952171,0.9493567,0.00021744169,0.025748823,0.0006092237,0.023736397],"study_design_scores_gemma":[0.00062436686,0.000030278485,0.00003437815,0.000057484936,0.00006878341,0.0013316943,0.000084426836,0.9941875,0.00027467863,0.0009664065,0.0022154122,0.00012461246],"about_ca_topic_score_codex":3.4125313e-7,"about_ca_topic_score_gemma":1.7382231e-7,"teacher_disagreement_score":0.11559531,"about_ca_system_score_codex":0.00004734751,"about_ca_system_score_gemma":0.000016727952,"threshold_uncertainty_score":0.4969236},"labels":[],"label_agreement":null},{"id":"W2043266505","doi":"10.1061/(asce)co.1943-7862.0000298","title":"Construction Engineering Today","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Linnaeus Plant Sciences (Canada)","funders":"","keywords":"Work (physics); Plan (archaeology); Process (computing); Construction engineering; Key (lock); Field (mathematics); Engineering; Engineering management; Computer science; Civil engineering; Computer security; Mechanical engineering; Geography; Archaeology","score_opus":0.006036222721732598,"score_gpt":0.160348930259966,"score_spread":0.1543127075382334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043266505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28481814,0.001357506,0.6935743,0.000050570947,0.008858598,0.00023339086,0.00000402887,0.00052415044,0.010579288],"genre_scores_gemma":[0.8866765,0.0012241001,0.11177649,0.000010079267,0.00023041795,0.000008395417,9.621074e-7,0.000031076626,0.000041969084],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915195,0.0000068235486,0.0004257024,0.00009638887,0.00015553847,0.00016357187],"domain_scores_gemma":[0.99961495,0.000011567281,0.00009358616,0.000101144265,0.00007789978,0.00010081898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001354679,0.00016931005,0.00019333145,0.00041935986,0.000035906975,0.000035827212,0.00007603742,0.000074166885,0.00006097043],"category_scores_gemma":[0.000008762207,0.0001687161,0.000074339296,0.00018958692,0.000040202103,0.00032245455,0.000015085101,0.00020611666,0.0000039236766],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006781444,0.000045064135,0.0015007218,0.0009109055,0.0012104178,0.00012938445,0.00081312197,0.07907011,0.0069843708,0.36743516,0.0011115995,0.54072136],"study_design_scores_gemma":[0.009944411,0.0010425764,0.06036739,0.0027326613,0.0018946973,0.043949407,0.0073211812,0.4203552,0.058032665,0.00786988,0.3819798,0.0045101484],"about_ca_topic_score_codex":0.0000013953438,"about_ca_topic_score_gemma":3.1949875e-7,"teacher_disagreement_score":0.6018584,"about_ca_system_score_codex":0.000057437428,"about_ca_system_score_gemma":0.0000068601253,"threshold_uncertainty_score":0.6880043},"labels":[],"label_agreement":null},{"id":"W2043303247","doi":"10.1145/1878537.1878742","title":"BIM-based building dashboard","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Dashboard; Computer science; Occupancy; Visualization; Context (archaeology); Data visualization; Set (abstract data type); Human–computer interaction; Database; Data mining; Architectural engineering; Engineering","score_opus":0.004479858944589057,"score_gpt":0.19696841121006128,"score_spread":0.19248855226547223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043303247","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7122751,0.000009193319,0.21385717,0.00010001631,0.0016598996,0.000035723664,0.0000010094595,0.0007344571,0.07132742],"genre_scores_gemma":[0.97770685,5.3820884e-7,0.022040162,0.000050199116,0.000089169844,0.0000049027867,0.0000011534316,0.000006858378,0.00010017086],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99980056,0.0000014568684,0.00005461916,0.0000433412,0.000039044888,0.0000609719],"domain_scores_gemma":[0.9998718,0.000008153472,0.0000037886946,0.000078099685,0.0000138151345,0.000024330302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000022884915,0.00004045374,0.000030678446,0.000037163503,0.000020157882,0.000019642446,0.000034588174,0.00004200027,0.00078222505],"category_scores_gemma":[0.00000464618,0.00003539709,0.000018565108,0.000056811816,0.000011667838,0.000049179776,0.000001807979,0.00010422619,0.00006656649],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014785528,0.000004625755,0.0018947276,0.000010193292,0.000007787667,5.850313e-7,0.00001193554,0.002456022,0.60305524,0.29574922,0.002952493,0.09385571],"study_design_scores_gemma":[0.00026996472,0.000009940742,0.001943555,0.00000639753,0.000006719483,0.000009457801,0.00003061162,0.2689875,0.5997769,0.0030274787,0.12571627,0.00021514499],"about_ca_topic_score_codex":0.000006122575,"about_ca_topic_score_gemma":0.000049946833,"teacher_disagreement_score":0.29272175,"about_ca_system_score_codex":0.0000050559606,"about_ca_system_score_gemma":0.000005535749,"threshold_uncertainty_score":0.8564816},"labels":[],"label_agreement":null},{"id":"W2044130816","doi":"10.1111/j.1467-8667.2006.00456.x","title":"Mobile Model-Based Bridge Lifecycle Management System","year":2006,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Bridge (graph theory); Computer science; Application lifecycle management; System lifecycle; Java; Systems engineering; Software engineering; Database; Embedded system; Operating system; Engineering; Software","score_opus":0.0024965107397700538,"score_gpt":0.15683243461842353,"score_spread":0.15433592387865347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044130816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10078261,0.00046729,0.8942495,0.0000033182607,0.00079572643,0.00017751454,0.000011506555,0.00097555557,0.0025369867],"genre_scores_gemma":[0.9708355,0.000016860153,0.028591424,0.000021790087,0.0003854586,0.000053078333,0.000024842198,0.00004322797,0.000027783693],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990695,0.00000682379,0.00028188643,0.0002366065,0.0001363935,0.0002687841],"domain_scores_gemma":[0.99963576,0.00001267462,0.000029040568,0.00021062036,0.000029812289,0.000082109334],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000044945766,0.0002705484,0.00021249359,0.00017494847,0.00007095026,0.00009856437,0.000117605174,0.000110336405,0.000010245093],"category_scores_gemma":[6.3905156e-7,0.00027421385,0.00006377552,0.0001752243,0.000021238322,0.0001512043,0.000032971744,0.0001820691,0.000005461394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019709082,0.000003825252,0.00009393301,0.00033851428,0.000024766632,0.000005330467,0.000025650064,0.9707993,0.0006028225,0.0077039236,0.0014466776,0.01895327],"study_design_scores_gemma":[0.00035909214,0.000023700662,0.00585668,0.00011583936,0.000021148697,0.000034768673,0.000009537349,0.98796624,0.0005757972,0.00021318338,0.0045427177,0.00028129626],"about_ca_topic_score_codex":0.0000050546187,"about_ca_topic_score_gemma":0.0000023700788,"teacher_disagreement_score":0.87005293,"about_ca_system_score_codex":0.00009887602,"about_ca_system_score_gemma":0.000007896564,"threshold_uncertainty_score":0.99997103},"labels":[],"label_agreement":null},{"id":"W2045053213","doi":"10.1016/j.aei.2015.01.005","title":"Joint probability for evaluating the schedule and cost of stochastic simulation models","year":2015,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Computer science; Joint probability distribution; Joint (building); Conditional probability; Operations research; Reliability engineering; Engineering; Statistics; Mathematics","score_opus":0.062428956612674606,"score_gpt":0.28021842896793586,"score_spread":0.21778947235526125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045053213","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11236374,0.00007785119,0.88675493,0.0000057914767,0.00017772951,0.0004147787,0.0000070823075,0.00009839547,0.00009970435],"genre_scores_gemma":[0.8767933,0.0000017692057,0.12309149,0.000003895648,0.000014426607,0.000075986565,0.000006312244,0.0000098950995,0.000002893883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943066,0.000003139149,0.00031814966,0.00003564944,0.00010992814,0.00010250001],"domain_scores_gemma":[0.9995548,0.00008462215,0.000051391104,0.00011866159,0.00015186658,0.000038661616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023127915,0.000086851396,0.0001053564,0.00003832759,0.0000265049,0.000015659996,0.00004110521,0.000038017937,6.1014964e-7],"category_scores_gemma":[0.00015773621,0.000070242844,0.000021776157,0.000081704275,0.000020030113,0.0003822244,0.000010753243,0.00007668429,5.6160843e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005276654,0.0000016956366,0.0000018826438,0.00013073104,0.000008186045,3.1613079e-9,0.00074870663,0.9737037,0.00024453443,0.006420735,0.0000026516827,0.01873192],"study_design_scores_gemma":[0.00032543615,0.000047151603,0.000013092698,0.00003834599,0.000011493824,0.0000018582597,0.00025858998,0.99485624,0.0004929312,0.0038087068,0.0000694154,0.00007671849],"about_ca_topic_score_codex":4.70221e-7,"about_ca_topic_score_gemma":5.4506955e-7,"teacher_disagreement_score":0.76442957,"about_ca_system_score_codex":0.000050212042,"about_ca_system_score_gemma":0.000016863965,"threshold_uncertainty_score":0.286442},"labels":[],"label_agreement":null},{"id":"W2045216131","doi":"10.1016/j.autcon.2005.12.002","title":"Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot","year":2006,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Robot; Clearing; Control engineering; Computer science; Control (management); Simulation; Engineering; Artificial intelligence; Business","score_opus":0.011480873834064202,"score_gpt":0.22435559485731763,"score_spread":0.21287472102325342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045216131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41350493,0.00006422873,0.585966,0.000015133438,0.000099264325,0.00023454768,0.0000019036993,0.00008693449,0.00002705311],"genre_scores_gemma":[0.96604335,0.00001683556,0.03383376,0.0000046463874,0.00003651887,0.000042160118,0.000010151027,0.000011192186,0.0000013904023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993045,0.00003567801,0.00037708948,0.0001250083,0.0000681942,0.0000895571],"domain_scores_gemma":[0.99967074,0.00011065487,0.000054682885,0.00005098875,0.00009544727,0.000017477638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018337692,0.00009013328,0.00013437303,0.0002009738,0.000055112403,0.00003321143,0.000016489934,0.00012069506,0.000004194722],"category_scores_gemma":[0.000026123995,0.00009679,0.00002080648,0.0001530178,0.000053990858,0.00026874722,0.0000029999037,0.00007424957,2.8807077e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037784503,0.000004209921,0.0029474807,0.000036466394,0.000008803038,6.129517e-8,0.00004442287,0.9521859,0.008718901,0.005456225,0.0000016632372,0.030558044],"study_design_scores_gemma":[0.0013796866,0.000021905867,0.0042923414,0.00003365645,0.000017168955,0.000013988323,0.0000706568,0.9881067,0.0010200923,0.0049453084,0.000007736384,0.00009072824],"about_ca_topic_score_codex":0.000028819015,"about_ca_topic_score_gemma":0.000015888558,"teacher_disagreement_score":0.5525384,"about_ca_system_score_codex":0.0000263784,"about_ca_system_score_gemma":0.000010646923,"threshold_uncertainty_score":0.39469814},"labels":[],"label_agreement":null},{"id":"W2046011793","doi":"10.5555/1639809.1655402","title":"Developing a general purpose simulation model for steel pipe-rack installation","year":2009,"lang":"en","type":"article","venue":"Spring Simulation Multiconference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Rack; Piping; Engineering; Resource (disambiguation); Software; Duration (music); Instrumentation (computer programming); Computer science; Mechanical engineering","score_opus":0.048276606315324246,"score_gpt":0.2933228073973925,"score_spread":0.2450462010820683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2046011793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31607732,0.000022539503,0.6826463,0.000036905818,0.00017785103,0.0003606841,0.0000056639433,0.00033380347,0.0003389203],"genre_scores_gemma":[0.94209576,0.000008488453,0.057508793,0.00007119993,0.00012569572,0.000026605438,0.000033999986,0.000024049321,0.000105431754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99889284,0.00001713962,0.00041795726,0.0002482791,0.00017940855,0.00024434633],"domain_scores_gemma":[0.99927324,0.00010473343,0.00008367518,0.00019617112,0.0002802663,0.0000618977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011029635,0.0002103999,0.00017047283,0.00016520951,0.00016001273,0.000120669516,0.00010164822,0.00014986993,0.0000123551345],"category_scores_gemma":[0.00008568064,0.00023449582,0.00006820922,0.00015599285,0.0000187336,0.0005707578,0.000009694183,0.00012648484,0.000013333902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017985438,0.00000795661,0.00031625648,0.000022034821,0.000007647561,1.08205136e-7,0.00025656802,0.8821485,0.008050923,0.020874927,0.0000012022156,0.08829586],"study_design_scores_gemma":[0.0005666516,0.000018754234,0.010243526,0.00004568215,0.000014917146,4.4805066e-7,0.000021853826,0.9815075,0.0021787607,0.004715596,0.00040080922,0.00028552118],"about_ca_topic_score_codex":0.00000635377,"about_ca_topic_score_gemma":0.000023466924,"teacher_disagreement_score":0.6260184,"about_ca_system_score_codex":0.00018118575,"about_ca_system_score_gemma":0.00006045313,"threshold_uncertainty_score":0.9562462},"labels":[],"label_agreement":null},{"id":"W2048925155","doi":"10.1117/12.470731","title":"&lt;title&gt;Re-engineering organizations for optimal deployment of smart materials and intelligent devices in civil infrastructure&lt;/title&gt;","year":2002,"lang":"en","type":"article","venue":"Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Software deployment; Scope (computer science); Business process reengineering; Computer science; Building automation; Data collection; Domain (mathematical analysis); Systems engineering; Engineering management; Engineering; Software engineering; Manufacturing engineering","score_opus":0.008136071057903394,"score_gpt":0.2008822047774641,"score_spread":0.1927461337195607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048925155","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.994917,0.00025892307,0.0006231691,0.0002067179,0.00038225186,0.0002814338,0.000046221794,0.00007361184,0.003210698],"genre_scores_gemma":[0.95540863,0.00027098964,0.04376016,0.000019431764,0.00021498567,0.000079612495,0.0000090035655,0.000057969755,0.00017923888],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991308,1.40916265e-8,0.00038679747,0.0001404072,0.00018382934,0.00015818533],"domain_scores_gemma":[0.99944776,0.000040563093,0.00009208256,0.000030356789,0.00034653433,0.000042694926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012760625,0.0001563937,0.00020644265,0.0001001079,0.000022450864,0.00004301918,0.00019713669,0.000113901435,0.00017177397],"category_scores_gemma":[0.00011315625,0.00014228983,0.00010175089,0.0001986766,0.0000536167,0.00016441343,0.000036355435,0.0000980254,0.0000030179121],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016469696,0.000039806833,0.00022915968,0.000782302,0.00024981043,4.765439e-8,0.0002715125,0.002321998,0.4719584,0.51328975,0.009351517,0.0014892232],"study_design_scores_gemma":[0.0011664876,0.00026879486,0.001360467,0.0007067656,0.00021376701,0.000029303243,0.0006171145,0.41232762,0.5135928,0.0014039095,0.06756739,0.00074559456],"about_ca_topic_score_codex":0.0000011706,"about_ca_topic_score_gemma":4.010979e-7,"teacher_disagreement_score":0.5118858,"about_ca_system_score_codex":0.00007581738,"about_ca_system_score_gemma":0.000008271983,"threshold_uncertainty_score":0.5802411},"labels":[],"label_agreement":null},{"id":"W2050255150","doi":"10.1061/41109(373)11","title":"Real Time Information Integration via \"i-Booth\"","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Interface (matter); Productivity; Computer science; Process (computing); Automation; Information system; Point (geometry); Office automation; System integration; User interface; Graphical user interface; Management information systems; Information technology; Information management; Software engineering; Engineering; Knowledge management; Database; Operating system","score_opus":0.0021742284984112153,"score_gpt":0.17064928456159922,"score_spread":0.16847505606318802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050255150","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27324036,0.000001704182,0.18278071,0.00008333676,0.0014432903,0.000116209,0.0000035353346,0.0010781996,0.5412527],"genre_scores_gemma":[0.99417096,0.0000053384533,0.004977398,0.000028679284,0.00010730822,0.000011818232,0.00005192195,0.0000061843475,0.00064036483],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996993,0.0000029156236,0.00013248666,0.000033746874,0.00006590688,0.00006563495],"domain_scores_gemma":[0.99981844,0.0000066486828,0.000013674074,0.000085989894,0.0000475751,0.000027675655],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000042051626,0.000059720573,0.000042514384,0.00006718472,0.000029143697,0.000046477882,0.00003848437,0.000079335914,0.0012753076],"category_scores_gemma":[0.0000064086416,0.000051231615,0.000020267235,0.0000743238,0.000013765119,0.0006660572,0.0000031290026,0.00012731404,0.0012120465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034585055,0.0000036378212,0.00008665846,0.0000058655046,0.000007899169,8.154001e-8,0.00021007797,0.0001533645,0.39254943,0.05171658,0.0067624566,0.5485005],"study_design_scores_gemma":[0.0003445529,0.00003528583,0.0045351153,0.000008381714,0.000012733847,0.000044073204,0.00014295976,0.73945564,0.18311614,0.0039782026,0.06797388,0.00035302163],"about_ca_topic_score_codex":0.000036295816,"about_ca_topic_score_gemma":0.00006599834,"teacher_disagreement_score":0.7393023,"about_ca_system_score_codex":0.000014528587,"about_ca_system_score_gemma":0.0000065882396,"threshold_uncertainty_score":0.99963766},"labels":[],"label_agreement":null},{"id":"W2051170580","doi":"10.1061/(asce)cp.1943-5487.0000398","title":"Erratum for “Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs.-BIM System” by Frédéric Bosché, Adrien Guillemet, Yelda Turkan, Carl T. Haas, and Ralph Haas","year":2014,"lang":"en","type":"erratum","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Value (mathematics); Engineering; Computer science; Machine learning","score_opus":0.008265015002356432,"score_gpt":0.2350079744955059,"score_spread":0.22674295949314946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051170580","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.077211685,0.07256243,0.7955162,0.00021979777,0.04916413,0.0010859825,0.00006680705,0.0002344035,0.0039385688],"genre_scores_gemma":[0.99374795,0.00056394906,0.0038493383,0.000014759797,0.0015405687,0.00001077591,0.00001487134,0.00012938082,0.00012837813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99662536,0.00013095366,0.0018060412,0.0002491164,0.00059714384,0.0005913795],"domain_scores_gemma":[0.9969437,0.00085635355,0.0012213506,0.00040056484,0.00045940545,0.00011863704],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0017452532,0.00050302065,0.0011289224,0.00051075453,0.00014480265,0.0002566014,0.00059376896,0.0004543628,0.0000032703567],"category_scores_gemma":[0.00046638714,0.0003642675,0.00032553187,0.000543144,0.000093510294,0.00030280324,0.00009084967,0.0019186034,1.632644e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026473816,0.00002485558,0.00080439105,0.003839387,0.0006126085,0.0000061034125,0.0013539114,0.8853708,0.0016359277,0.0013971211,0.095673926,0.009254492],"study_design_scores_gemma":[0.0008933938,0.00012419134,0.002478518,0.01261695,0.000310434,0.00023531968,0.0015899759,0.9346306,0.00044411203,0.000084662985,0.04606996,0.0005218901],"about_ca_topic_score_codex":0.00009544243,"about_ca_topic_score_gemma":0.00007044216,"teacher_disagreement_score":0.9165363,"about_ca_system_score_codex":0.00032601875,"about_ca_system_score_gemma":0.00022193493,"threshold_uncertainty_score":0.9998809},"labels":[],"label_agreement":null},{"id":"W2051592596","doi":"10.3992/jgb.1.1.63","title":"Compressive Testing and Analysis of Plastered Straw Bales","year":2006,"lang":"en","type":"article","venue":"Journal of Green Building","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Compressive strength; Straw; Structural engineering; Engineering; Materials science; Composite material; Chemistry","score_opus":0.012153958329760128,"score_gpt":0.21485742796837676,"score_spread":0.20270346963861663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051592596","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9827014,0.00035808506,0.016336873,0.000010052455,0.00008642272,0.0000133203375,0.0000052684045,0.000010590307,0.0004779493],"genre_scores_gemma":[0.9899284,0.0000073155484,0.009963655,0.0000018988247,0.00008480956,1.7207594e-7,5.367092e-7,0.000004654244,0.000008521799],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99948305,0.000009765592,0.00030980646,0.000036373425,0.00010120866,0.000059814574],"domain_scores_gemma":[0.99956834,0.00009256363,0.00017443465,0.000035851845,0.0001059474,0.000022868015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007138382,0.00005563901,0.00018050129,0.00028194126,0.000024616555,0.000019284811,0.000044557524,0.000030748426,0.000011344915],"category_scores_gemma":[0.000016857255,0.000048679223,0.00005832899,0.00028252075,0.000024179584,0.00013174555,0.000006057094,0.00008879481,9.018188e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018959514,0.00001595365,0.36525398,0.00007045629,0.0009268936,0.000013784274,0.00016228257,0.15892504,0.41174972,0.001553928,0.00013390314,0.06117511],"study_design_scores_gemma":[0.0006664989,0.00010072591,0.6206463,0.0002956099,0.0011678177,0.0002275007,0.00037947306,0.3370421,0.037551757,0.0015327528,0.00017292699,0.00021652206],"about_ca_topic_score_codex":0.00006904619,"about_ca_topic_score_gemma":0.00003837799,"teacher_disagreement_score":0.37419796,"about_ca_system_score_codex":0.000016011192,"about_ca_system_score_gemma":0.0000064190763,"threshold_uncertainty_score":0.1985081},"labels":[],"label_agreement":null},{"id":"W2052621624","doi":"10.1061/(asce)co.1943-7862.0000224","title":"SuretyAssist: Fuzzy Expert System to Assist Surety Underwriters in Evaluating Construction Contractors for Bonding","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Surety; Underwriting; Fuzzy logic; Process (computing); Work (physics); Expert system; Risk analysis (engineering); Actuarial science; Computer science; Engineering; Construction engineering; Business; Artificial intelligence; Finance","score_opus":0.009430282465756085,"score_gpt":0.23643158085498223,"score_spread":0.22700129838922614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052621624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7686022,0.00017347536,0.22225957,0.0001686896,0.007506968,0.0003942362,0.000006191926,0.00014871144,0.0007399461],"genre_scores_gemma":[0.92940736,0.000039934574,0.07020866,0.000011826137,0.00026060423,0.000032527038,0.0000018863526,0.000023432849,0.000013770794],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988398,0.000015806681,0.0005921449,0.00014164728,0.0002080897,0.00020251142],"domain_scores_gemma":[0.9994538,0.00006356429,0.00013519138,0.00010177018,0.00012809642,0.00011761192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005390611,0.00017726679,0.00026785108,0.00055342604,0.00006878108,0.00009914568,0.00007444542,0.00010455788,0.0000054955954],"category_scores_gemma":[0.000040319555,0.00017928897,0.000086097796,0.00023346908,0.00003573548,0.00025879627,0.000011471033,0.00027812234,6.039275e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017967803,0.00003553153,0.007459749,0.0013861723,0.0005820608,0.000026438394,0.0006763146,0.1045793,0.077769876,0.34087244,0.0007151865,0.46571726],"study_design_scores_gemma":[0.016853135,0.0010155102,0.095649175,0.0050174245,0.0009133359,0.009076358,0.032218438,0.70565486,0.021373238,0.002131078,0.10640373,0.003693715],"about_ca_topic_score_codex":0.0000045013417,"about_ca_topic_score_gemma":0.000011700651,"teacher_disagreement_score":0.6010756,"about_ca_system_score_codex":0.00016922304,"about_ca_system_score_gemma":0.000016763019,"threshold_uncertainty_score":0.73111916},"labels":[],"label_agreement":null},{"id":"W2052764147","doi":"10.1061/(asce)0733-9364(2006)132:2(143)","title":"Computer-Aided Site Layout Planning","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Representation (politics); Reuse; Interconnectivity; Computer Aided Design; Visualization; Object (grammar); Domain (mathematical analysis); Knowledge base; Process (computing); Engineering drawing; Data mining; Programming language; Artificial intelligence; Engineering","score_opus":0.003312205326125199,"score_gpt":0.16839096680295146,"score_spread":0.16507876147682626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052764147","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42180488,0.00064340385,0.5732341,0.000034886663,0.0019853555,0.00005595968,0.0000013412035,0.00013820034,0.002101887],"genre_scores_gemma":[0.95910436,0.000121707366,0.040270913,0.000009584576,0.00042515487,0.0000020594205,0.0000017983066,0.000013373183,0.00005106446],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994478,0.0000047982853,0.0002826684,0.000057044832,0.00010966765,0.00009802599],"domain_scores_gemma":[0.9998003,0.000009686485,0.0000618856,0.000051326737,0.000039499475,0.000037278667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007694784,0.000096876494,0.00012324883,0.00023444956,0.000030587995,0.000049585164,0.000035954392,0.000035835314,0.00000833517],"category_scores_gemma":[0.0000011129155,0.000094369876,0.000042662417,0.000098687604,0.000017695076,0.00015848754,0.000008882377,0.00011279884,0.0000019616602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008029677,0.000007731488,0.0012474356,0.00015050228,0.000116889125,0.000033984772,0.00005887715,0.90407383,0.0013350651,0.026005348,0.0018370063,0.06512527],"study_design_scores_gemma":[0.0024621498,0.00015686112,0.045860507,0.00067591557,0.00024084034,0.0038936941,0.00043652006,0.7644177,0.0020241183,0.0014623683,0.17764556,0.0007237489],"about_ca_topic_score_codex":0.0000017839204,"about_ca_topic_score_gemma":3.577036e-7,"teacher_disagreement_score":0.53729945,"about_ca_system_score_codex":0.000032649725,"about_ca_system_score_gemma":0.0000027992496,"threshold_uncertainty_score":0.3848292},"labels":[],"label_agreement":null},{"id":"W2053187089","doi":"10.18260/1-2--8497","title":"Internet Based Interactive Construction Management Learning System","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Arizona State University; Western Michigan University; University of Alberta; National Science Foundation","keywords":"Computer science; The Internet; Session (web analytics); VRML; Curriculum; Mentorship; Multimedia; Construction management; Engineering management; World Wide Web; Engineering","score_opus":0.008006505658001973,"score_gpt":0.17796971701876815,"score_spread":0.16996321136076617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053187089","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020697119,0.000016469581,0.74407554,0.00012935576,0.0006919105,0.00011240735,0.0000010179878,0.0012798847,0.23299627],"genre_scores_gemma":[0.99517965,0.0000019346382,0.004481989,0.000068608875,0.00005913342,0.000014514005,0.000006839629,0.000010593722,0.00017673489],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996283,0.000015249647,0.00012175939,0.000098699384,0.00006532802,0.00007064478],"domain_scores_gemma":[0.9998693,0.000008918737,0.000017567505,0.000040431034,0.000021476057,0.000042333635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000019992207,0.00007537813,0.000068678724,0.000043809436,0.00001986842,0.000036395628,0.000041818097,0.000030327528,0.00033101442],"category_scores_gemma":[0.0000027848114,0.000072197916,0.000031106516,0.00009785937,0.000013494622,0.00010139963,0.000008701559,0.0001260039,0.00018210783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013368674,0.000015573734,0.004770063,0.0010704314,0.000442918,0.000031641437,0.0014590618,0.114953965,0.0036680994,0.32549477,0.009764537,0.53819525],"study_design_scores_gemma":[0.00027933417,0.00002936247,0.0001786468,0.000052005962,0.000017362943,0.000012899966,0.004498455,0.96779346,0.011144973,0.000014546688,0.01585708,0.000121838966],"about_ca_topic_score_codex":0.0000044905178,"about_ca_topic_score_gemma":0.0000013284255,"teacher_disagreement_score":0.97448254,"about_ca_system_score_codex":0.00006453743,"about_ca_system_score_gemma":0.000002546034,"threshold_uncertainty_score":0.36243758},"labels":[],"label_agreement":null},{"id":"W2055331093","doi":"10.3141/2456-06","title":"New and Innovative Concrete Pavements with Structural Dome Formwork System","year":2014,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Formwork; Truck; Engineering; Civil engineering; Interlocking; Slab; Forensic engineering; Structural engineering","score_opus":0.028450089863455406,"score_gpt":0.3018075542387965,"score_spread":0.2733574643753411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055331093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.973685,0.00013592045,0.023922116,0.00045679606,0.00051444664,0.0005569558,0.000023861263,0.00006081149,0.0006440507],"genre_scores_gemma":[0.99469054,0.00012573485,0.004642981,0.000015224834,0.00021049408,0.000028243756,0.000011900058,0.000042245607,0.00023265331],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9961251,0.00036911725,0.0008546706,0.0002276381,0.0019022862,0.0005211568],"domain_scores_gemma":[0.99663556,0.00034071424,0.00020364615,0.00024712566,0.002279939,0.0002930154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015473907,0.00021341367,0.00033472793,0.00059068453,0.00039435155,0.00014802128,0.00040377537,0.0001373731,0.00010362202],"category_scores_gemma":[0.000033931352,0.00014321126,0.00009608374,0.0017295299,0.000336092,0.0006206,0.0000029616667,0.0013975484,0.000008523492],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004086424,0.000029057133,0.54885936,0.0020682511,0.0012621125,0.000103016464,0.010557246,0.008459101,0.017586945,0.22099014,0.016807104,0.16919127],"study_design_scores_gemma":[0.0040402235,0.0009597459,0.95935243,0.001070791,0.000075609685,0.000007244975,0.0054108934,0.0032604309,0.005453728,0.0038919053,0.016056258,0.0004207414],"about_ca_topic_score_codex":0.0017481499,"about_ca_topic_score_gemma":0.0062478925,"teacher_disagreement_score":0.41049308,"about_ca_system_score_codex":0.00018632696,"about_ca_system_score_gemma":0.00023579996,"threshold_uncertainty_score":0.607173},"labels":[],"label_agreement":null},{"id":"W2055720265","doi":"10.1139/l03-002","title":"Data acquisition and analysis for highway construction using geographic information systems","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Earthworks; Terrain; Geographic information system; Interface (matter); Software; Computer science; Data acquisition; Key (lock); Information system; Data mining; Transport engineering; Engineering; Remote sensing","score_opus":0.010822040198297167,"score_gpt":0.18431591202702685,"score_spread":0.1734938718287297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055720265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09241427,0.0011932692,0.9044163,0.000010793295,0.0013650873,0.000097394324,0.00014358302,0.000029498573,0.0003297753],"genre_scores_gemma":[0.99672896,0.00002852162,0.0031228678,0.000005250872,0.000066386834,0.000002232429,0.00003571087,0.000009065502,0.0000010115549],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940205,0.000009931099,0.0003170936,0.00005376228,0.00007413995,0.00014305489],"domain_scores_gemma":[0.99944437,0.000027011134,0.00008247864,0.00011990115,0.0001500853,0.00017614407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025697576,0.00009155666,0.00015694927,0.0009244006,0.000063716725,0.00013148235,0.00007276235,0.000070987706,0.000026332324],"category_scores_gemma":[0.000057245394,0.00009834706,0.000048217087,0.00038279477,0.00001883228,0.00088860566,0.0000019690497,0.00009753637,3.489413e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023743078,0.0000010273604,0.007844188,0.0001423483,0.00056965067,0.00000225786,0.00009923369,0.95582104,0.0007257027,0.033546627,0.00023965578,0.0010058765],"study_design_scores_gemma":[0.00026871942,0.000017372065,0.0021151616,0.00009261065,0.00033406782,0.0003474785,0.00027462572,0.97683877,0.00016566433,0.00013688653,0.019211547,0.00019711095],"about_ca_topic_score_codex":0.00012302438,"about_ca_topic_score_gemma":0.0028230546,"teacher_disagreement_score":0.9043147,"about_ca_system_score_codex":0.00008733352,"about_ca_system_score_gemma":0.00009446412,"threshold_uncertainty_score":0.40104768},"labels":[],"label_agreement":null},{"id":"W2055836158","doi":"10.1139/l05-004","title":"Modeling uncertainty with an integrated simulation system","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Duration (music); Computer science; Reliability (semiconductor); Key (lock); Simulation modeling; Industrial engineering; Reliability engineering; Uncertainty analysis; Simulation; Data mining; Engineering; Machine learning","score_opus":0.007462476721214755,"score_gpt":0.17761648831458887,"score_spread":0.17015401159337412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055836158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20419732,0.00026235188,0.7938901,0.000019970625,0.00045476624,0.00004993872,0.0000055071555,0.00010949403,0.00101053],"genre_scores_gemma":[0.9977599,0.0000024721019,0.0019007501,0.0000068904646,0.000288627,0.0000015338807,0.000003858888,0.00002830445,0.000007668304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993779,0.000007790177,0.00026901695,0.00005942994,0.00010121305,0.00018462671],"domain_scores_gemma":[0.9993619,0.000010409314,0.0000307877,0.00008707774,0.00018838368,0.00032146156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010777929,0.00012125515,0.00013904592,0.00031796226,0.00004353955,0.000063457395,0.00009114197,0.00006615825,0.000046006684],"category_scores_gemma":[0.000012740788,0.00010759227,0.000035474142,0.00018280059,0.000008954348,0.00043212707,8.594135e-7,0.00022956739,0.00000289638],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035435644,8.3148933e-7,0.00004022872,0.000020065254,0.000024219504,0.000008714358,0.00015667152,0.9943881,0.00009690451,0.0005147569,0.000022584358,0.0047234],"study_design_scores_gemma":[0.00017605508,0.0000353119,0.00002582506,0.00017170204,0.000016474205,0.000158759,0.0002905073,0.9950535,0.00005937926,0.000004758672,0.0038829003,0.00012479305],"about_ca_topic_score_codex":0.00033971283,"about_ca_topic_score_gemma":0.10085366,"teacher_disagreement_score":0.7935626,"about_ca_system_score_codex":0.00044253867,"about_ca_system_score_gemma":0.0001839183,"threshold_uncertainty_score":0.9155534},"labels":[],"label_agreement":null},{"id":"W2056014594","doi":"10.3141/1974-03","title":"Analytic Hierarchy Process as a Tool for Infrastructure Management","year":2006,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Analytic hierarchy process; Process (computing); Hierarchy; Process management; Engineering; Computer science; Management science; Transport engineering; Operations research; Business; Economics","score_opus":0.022982463188394087,"score_gpt":0.3261378533297715,"score_spread":0.30315539014137743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056014594","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98106617,0.00022077606,0.0146524245,0.00084193586,0.000662152,0.001330788,0.000069959526,0.00007140993,0.0010843951],"genre_scores_gemma":[0.99524456,0.00033798604,0.002770987,0.000022734504,0.00029472713,0.00021423734,0.00003641407,0.00005851104,0.0010198288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99541223,0.00022580981,0.0011637138,0.00028254619,0.0022349313,0.00068079197],"domain_scores_gemma":[0.9966027,0.0003031028,0.00019248089,0.00031544626,0.0024268937,0.0001593846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016239135,0.00023181357,0.0003295613,0.0010686573,0.00044560386,0.00015791065,0.00062754576,0.0001773609,0.00025701997],"category_scores_gemma":[0.000037482987,0.000179368,0.00035552736,0.0017999548,0.00032398666,0.00055607577,0.0000024752892,0.0013023705,0.000014327674],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0048830067,0.0005673699,0.25766122,0.005241502,0.0013373877,0.00032422077,0.004802662,0.27846208,0.010688923,0.1686224,0.10095155,0.16645765],"study_design_scores_gemma":[0.0030541697,0.0005264417,0.81150526,0.000501108,0.0001549337,0.0000042512565,0.002852351,0.0038097515,0.00494229,0.11511578,0.057090096,0.00044356103],"about_ca_topic_score_codex":0.00063827174,"about_ca_topic_score_gemma":0.0047238707,"teacher_disagreement_score":0.55384403,"about_ca_system_score_codex":0.000253266,"about_ca_system_score_gemma":0.00024285042,"threshold_uncertainty_score":0.7314415},"labels":[],"label_agreement":null},{"id":"W2056939082","doi":"10.1139/l05-126","title":"Geographic information system based roadway construction planning","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Information system; Computer science; Geographic information system; Plan (archaeology); Earthworks; Process (computing); Construction management; Integrated business planning; Information integration; Systems engineering; Transport engineering; Engineering; Database; Civil engineering; Operations management","score_opus":0.0029130582655594347,"score_gpt":0.14026369327163948,"score_spread":0.13735063500608005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056939082","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16800196,0.0012070874,0.80696946,0.000048971517,0.0051755183,0.000121166995,0.000023464874,0.0002787975,0.018173559],"genre_scores_gemma":[0.998661,0.000001167065,0.001066587,0.000007444925,0.00023741189,0.0000025688053,0.0000074497975,0.000013666407,0.0000027477336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925894,0.000006523682,0.00038810054,0.000037351852,0.00011666628,0.00019242377],"domain_scores_gemma":[0.99953586,0.000012957123,0.00008278363,0.000070505026,0.00012784277,0.0001700619],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011690946,0.00011433891,0.00013307818,0.0008039067,0.000060187784,0.00009562008,0.0000781384,0.00008633067,0.000042147247],"category_scores_gemma":[0.000013279877,0.00012298138,0.00007318082,0.00025384498,0.000019892173,0.00052279286,9.944437e-7,0.00020621608,0.0000051721554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014705586,4.1008732e-7,0.004694468,0.000076321485,0.000017402846,0.000011528887,0.000043147502,0.98910356,0.00018610805,0.0039265915,0.00059454737,0.0013444469],"study_design_scores_gemma":[0.0009629649,0.000052202875,0.031106578,0.00088756916,0.00006750636,0.0014201084,0.0006247442,0.90756273,0.0018292308,0.000122023856,0.054826044,0.0005383212],"about_ca_topic_score_codex":0.00037283218,"about_ca_topic_score_gemma":0.003977678,"teacher_disagreement_score":0.830659,"about_ca_system_score_codex":0.00021269752,"about_ca_system_score_gemma":0.0001428652,"threshold_uncertainty_score":0.50150347},"labels":[],"label_agreement":null},{"id":"W2058787072","doi":"10.1080/01446190500039911","title":"Deterministic models for assessing productivity and cost of bored piles","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Pile; Productivity; Engineering; Scheduling (production processes); Process (computing); Cost estimate; Civil engineering; Operations research; Operations management; Computer science; Geotechnical engineering; Economics","score_opus":0.016615757420088497,"score_gpt":0.20985470128868106,"score_spread":0.19323894386859256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058787072","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84593,0.00017541742,0.14729698,0.000060799157,0.00040029947,0.00033157313,0.000014957797,0.00006407378,0.0057258974],"genre_scores_gemma":[0.97831386,0.00030965166,0.021186344,0.0000062759395,0.000081030215,0.00003157134,0.00000679591,0.000008466347,0.000056013196],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996162,0.0000039592283,0.00016608101,0.00012314234,0.000015053197,0.000075567834],"domain_scores_gemma":[0.9998303,0.0000134833535,0.000044713306,0.00007043217,0.000017318722,0.000023730216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000063941385,0.00007475889,0.00010341256,0.00007733843,0.00005903675,0.000055440418,0.000022394115,0.000032646098,0.0000045595393],"category_scores_gemma":[0.000002163078,0.00008474405,0.000017637622,0.000024450126,0.00008834234,0.00039211087,0.000012076067,0.000028674744,3.828695e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000877722,0.000004245649,0.0011674768,0.00012573224,0.00003797898,4.031742e-8,0.00004359443,0.014549599,0.000064053944,0.088394195,0.0000625805,0.8955417],"study_design_scores_gemma":[0.00070386485,0.00001606697,0.0029970624,0.000027136266,0.000077852055,0.00002790449,0.00064870995,0.9613844,0.0010995105,0.020441968,0.012361536,0.00021399149],"about_ca_topic_score_codex":0.0000010050354,"about_ca_topic_score_gemma":0.000013308631,"teacher_disagreement_score":0.9468348,"about_ca_system_score_codex":0.000024123694,"about_ca_system_score_gemma":0.0000039954143,"threshold_uncertainty_score":0.34557623},"labels":[],"label_agreement":null},{"id":"W2060249893","doi":"10.1061/41109(373)35","title":"Simulation-Based Multiple Heavy Lift Planning in Industrial Construction","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Schedule; Lift (data mining); Process (computing); Lifting equipment; Engineering; Computer science; Construction engineering; Systems engineering; Operating system; Mechanical engineering","score_opus":0.020413991150754138,"score_gpt":0.23576834644544578,"score_spread":0.21535435529469166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060249893","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92934114,0.0000067415986,0.06367215,0.0000557493,0.0021921105,0.00012160402,0.0000035816092,0.0003337464,0.0042731864],"genre_scores_gemma":[0.9965682,1.619801e-7,0.0031690171,0.000027673279,0.00018300953,0.000010857211,0.0000126759205,0.000010047983,0.000018354824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953926,0.000009015838,0.0001804142,0.00009026059,0.00007482787,0.00010624015],"domain_scores_gemma":[0.9996575,0.00017630089,0.00001726758,0.0000864215,0.000026968091,0.000035536403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059555234,0.000079943784,0.00007513666,0.00013491079,0.000035219236,0.000030564886,0.000036652265,0.00016303355,0.0002888712],"category_scores_gemma":[0.00010705261,0.000080301535,0.000023066546,0.00015815557,0.000030593335,0.00012684606,0.0000027115982,0.00032066056,0.000019220208],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014684042,0.000005833675,0.09202425,0.000002789553,0.000003302863,5.835892e-7,0.000038651553,0.8789319,0.002786293,0.0010853686,0.000079363424,0.025027007],"study_design_scores_gemma":[0.00069453847,0.000007557303,0.0024480005,0.000010876599,0.0000020101381,0.0000014244696,0.00009010285,0.9847614,0.0073349765,0.00012905638,0.0044149733,0.000105092426],"about_ca_topic_score_codex":0.00004543129,"about_ca_topic_score_gemma":0.00021784012,"teacher_disagreement_score":0.10582952,"about_ca_system_score_codex":0.000022317587,"about_ca_system_score_gemma":0.000025612653,"threshold_uncertainty_score":0.32746017},"labels":[],"label_agreement":null},{"id":"W2060590051","doi":"10.1139/l06-086","title":"Nonlinear cash flow optimization model","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cash flow; Outflow; Inflow; Nonlinear programming; Linear programming; Profit (economics); Profit margin; Nonlinear system; Cash flow forecasting; Payment; Computer science; Cash; Operations research; Mathematical optimization; Economics; Finance; Mathematics; Microeconomics; Geology","score_opus":0.004369439984908432,"score_gpt":0.1541945033115943,"score_spread":0.14982506332668585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060590051","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005943287,0.0006322023,0.9869205,0.000041021376,0.0008739942,0.000030882533,0.000012566727,0.000049557446,0.0054960256],"genre_scores_gemma":[0.9607616,0.000015280177,0.03868557,0.000011532623,0.00040753974,0.000001287415,0.000006740849,0.000031060732,0.00007940306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944997,0.0000027880385,0.00024948193,0.000044223238,0.000081786195,0.00017175643],"domain_scores_gemma":[0.999619,0.0000072206994,0.000031402633,0.00006529879,0.00010180463,0.00017526881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006307743,0.000096873424,0.000109809494,0.00028446794,0.000033214947,0.000047642134,0.00007786054,0.000067901165,0.000113311246],"category_scores_gemma":[0.0000142850295,0.00010500358,0.000056119963,0.00014587442,0.000010357671,0.00020910312,0.0000013071366,0.00016950998,0.000003129263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.6216545e-7,9.621508e-7,0.00005517929,0.000010560269,0.00000972224,0.000011210122,0.000029181763,0.9970723,0.00022799757,0.0004140268,0.001703536,0.00046486538],"study_design_scores_gemma":[0.00012100981,0.000007175669,0.000041491177,0.00003541054,0.000010610489,0.00012758253,0.000008800478,0.9956373,0.00020804109,0.000083346764,0.0036148988,0.00010435791],"about_ca_topic_score_codex":0.0001854586,"about_ca_topic_score_gemma":0.028375722,"teacher_disagreement_score":0.9548183,"about_ca_system_score_codex":0.00014551594,"about_ca_system_score_gemma":0.00015219033,"threshold_uncertainty_score":0.9893539},"labels":[],"label_agreement":null},{"id":"W2060710173","doi":"10.1061/41098(368)115","title":"Construction Management of a Marine Terminal Expansion","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Shell (Canada); Victoria General Hospital","funders":"","keywords":"Terminal (telecommunication); Submarine pipeline; Downtime; Aggregate (composite); Civil engineering; Engineering; Environmental science; Computer science; Telecommunications; Geology; Oceanography","score_opus":0.004036953948311921,"score_gpt":0.19032344485802904,"score_spread":0.18628649090971713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060710173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83708805,0.00000320534,0.011573492,0.000013069645,0.0008895914,0.000050201274,7.770574e-7,0.0001255972,0.15025602],"genre_scores_gemma":[0.97191745,0.0000131886245,0.027670335,0.000003240542,0.000030128735,0.000005942485,0.0000030181473,0.00000435237,0.00035233088],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99975365,0.0000016483408,0.000099161356,0.000046065612,0.000053171163,0.000046271743],"domain_scores_gemma":[0.9998694,0.0000023586351,0.000010995209,0.00008274364,0.00001849337,0.000016012495],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000021825623,0.00004240615,0.00004262186,0.00004042232,0.000012223558,0.0000053840786,0.000027892731,0.000033126904,0.00092653267],"category_scores_gemma":[4.9348677e-7,0.00003762445,0.000018539538,0.000056011628,0.000028292834,0.000056392164,0.000009054414,0.00006460361,0.000014341282],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004282613,0.0000063313582,0.0015592977,0.000052064755,0.000016863567,0.0000014797458,0.000016616726,0.000041588235,0.044896513,0.11032453,0.00020570695,0.8428747],"study_design_scores_gemma":[0.0021771693,0.00013031304,0.12969072,0.00012661902,0.00014138965,0.00097003876,0.0024437378,0.07026725,0.7271828,0.023491075,0.042513486,0.0008654104],"about_ca_topic_score_codex":0.0000074476434,"about_ca_topic_score_gemma":0.000017941667,"teacher_disagreement_score":0.8420093,"about_ca_system_score_codex":0.0000044486796,"about_ca_system_score_gemma":0.000001958249,"threshold_uncertainty_score":0.99998677},"labels":[],"label_agreement":null},{"id":"W2060851341","doi":"10.1108/09699980610669705","title":"A knowledge‐based automated development permit approval process in the housing industry","year":2006,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Husky Energy (Canada); University of Alberta","funders":"","keywords":"Process (computing); Computer science; Context (archaeology); Productivity; Process management; Automation; Engineering management; Systems engineering; Risk analysis (engineering); Software engineering; Engineering; Business","score_opus":0.00657935767341986,"score_gpt":0.20934954724409463,"score_spread":0.20277018957067477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060851341","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96171993,0.00010289313,0.031308506,0.000074087715,0.00070211233,0.00042021938,0.0000016814511,0.0016344669,0.0040360824],"genre_scores_gemma":[0.98599976,9.395726e-7,0.013616146,0.000015124087,0.00012782862,0.00016891852,0.000019051522,0.00002960437,0.000022617998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885637,0.00002641568,0.00036490243,0.00022198589,0.00021690175,0.0003134546],"domain_scores_gemma":[0.99970454,0.000025968704,0.000036585785,0.00017099045,0.000028454682,0.000033465345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014411149,0.00025282198,0.00014561693,0.00041892586,0.000108423774,0.00009847071,0.00018034638,0.000116368916,0.000020214608],"category_scores_gemma":[0.0000047433377,0.00021409537,0.00004867749,0.0006572888,0.000049936025,0.000102277154,0.000018126359,0.0004818624,0.000012513464],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064395667,0.000021758708,0.0010523637,0.0002401737,0.000031951928,0.00001018997,0.00041095354,0.9171175,0.00023946071,0.0026940417,0.000064530424,0.07811067],"study_design_scores_gemma":[0.0008807595,0.000015742486,0.053357266,0.00023706953,0.00003222741,0.00017247497,0.0008738222,0.93524474,0.0027211097,0.00021629216,0.0056716376,0.00057684176],"about_ca_topic_score_codex":0.000010530658,"about_ca_topic_score_gemma":0.00002628718,"teacher_disagreement_score":0.07753383,"about_ca_system_score_codex":0.00016569693,"about_ca_system_score_gemma":0.00002529608,"threshold_uncertainty_score":0.87305564},"labels":[],"label_agreement":null},{"id":"W2061577898","doi":"10.1061/(asce)0733-9364(2008)134:5(311)","title":"Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Truck; Robustness (evolution); Duration (music); Resource (disambiguation); Discrete event simulation; Operations research; Resource allocation; Transport engineering; Engineering; Productivity; Computer science; Simulation; Automotive engineering","score_opus":0.009381056740152972,"score_gpt":0.2097687753113331,"score_spread":0.20038771857118012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061577898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9738639,0.00044231387,0.023784969,0.00003175397,0.00060765876,0.00022503732,0.0000019748825,0.000073428935,0.0009689418],"genre_scores_gemma":[0.9885802,0.0004633724,0.010815896,0.000004189282,0.00007703208,0.000011353156,6.310853e-7,0.000016816359,0.000030494488],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989587,0.000021865375,0.0005594894,0.000109140776,0.00022990636,0.00012090297],"domain_scores_gemma":[0.9995324,0.000025568512,0.00012244846,0.00014728849,0.00010086707,0.000071436225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020239792,0.00014447513,0.00022274666,0.00032671896,0.00006397143,0.000019158566,0.00006276446,0.000037739137,0.0000117908985],"category_scores_gemma":[0.000004601843,0.00014409168,0.00007712162,0.00022150725,0.00006171904,0.00019463382,0.000022533344,0.00012885066,8.3031244e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002936955,0.00068626093,0.06627435,0.0051060594,0.006030865,0.011982911,0.010963233,0.3838716,0.00073031103,0.044372253,0.010749995,0.45893848],"study_design_scores_gemma":[0.008122254,0.0017069275,0.72150975,0.0012562552,0.0013636169,0.10270307,0.03732401,0.02289261,0.0007387088,0.00035695516,0.10065408,0.001371764],"about_ca_topic_score_codex":0.000011457649,"about_ca_topic_score_gemma":0.0000021344197,"teacher_disagreement_score":0.6552354,"about_ca_system_score_codex":0.000058662732,"about_ca_system_score_gemma":0.0000055354994,"threshold_uncertainty_score":0.58758885},"labels":[],"label_agreement":null},{"id":"W2061904488","doi":"10.1007/s12273-013-0120-0","title":"Integrating building information modelling with sustainability to design building projects at the conceptual stage","year":2013,"lang":"en","type":"article","venue":"Building Simulation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Sustainability; Certification; Interoperability; Sustainable design; Systems engineering; Engineering; Construction engineering; Building design; Conceptual design; Information model; Computer science; Architectural engineering; Software engineering; World Wide Web; Operations management","score_opus":0.01957850118422395,"score_gpt":0.24282782820809679,"score_spread":0.22324932702387285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061904488","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45331132,0.00001951074,0.5451685,0.0000744488,0.000121605066,0.0008798804,0.0000022585173,0.00026503103,0.00015739459],"genre_scores_gemma":[0.9106672,0.0000016858319,0.08885409,0.00006773163,0.00009532531,0.00021117416,0.000010438434,0.000032361426,0.000059988903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844086,0.00008878223,0.00048559636,0.0002449113,0.00034839526,0.00039143383],"domain_scores_gemma":[0.99861604,0.0003475048,0.0001316526,0.00029109063,0.0005194916,0.00009419651],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045196456,0.00027639285,0.00018713741,0.00021661555,0.00046985326,0.00035253508,0.00016895254,0.00012552716,0.000069226495],"category_scores_gemma":[0.00016282321,0.00020541437,0.000052713338,0.00054130005,0.00007698358,0.0017966283,0.000050061997,0.00027551784,0.000022282493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025740645,0.000003921494,0.0003701364,0.000040428014,0.000018037168,2.20462e-7,0.0020659154,0.95829207,0.0031205413,0.016739402,0.00007008254,0.019253531],"study_design_scores_gemma":[0.00026647458,0.00006026049,0.0001777706,0.00007949866,0.000016598215,0.000004186943,0.0025493924,0.98398983,0.008951297,0.0013562387,0.002267363,0.00028108325],"about_ca_topic_score_codex":0.00025371017,"about_ca_topic_score_gemma":0.00001849503,"teacher_disagreement_score":0.45735586,"about_ca_system_score_codex":0.0007901085,"about_ca_system_score_gemma":0.00006865567,"threshold_uncertainty_score":0.8376555},"labels":[],"label_agreement":null},{"id":"W2062268729","doi":"10.1139/l04-061","title":"Collaborative work model under distributed construction environments","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Building information modeling; Database; Information system; Schedule; Information model; Software engineering; Systems engineering; Scheduling (production processes); Engineering","score_opus":0.0043761449000442225,"score_gpt":0.1611488104281886,"score_spread":0.15677266552814437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062268729","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07497056,0.0014301074,0.9198336,0.00023986009,0.0011978174,0.0000789005,0.000055397006,0.000051968174,0.0021417881],"genre_scores_gemma":[0.9969168,0.00003186732,0.002778383,0.000019141904,0.00019071896,0.0000023859043,0.000005972061,0.000020632831,0.000034098324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937606,0.0000057299853,0.00026396447,0.000057872905,0.0001006324,0.00019574445],"domain_scores_gemma":[0.99952114,0.000014453886,0.000049579827,0.00007360039,0.000048812857,0.00029240566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005867248,0.000120375,0.00013242605,0.00020716182,0.000046128418,0.0000430042,0.00008110238,0.00008173727,0.0001392617],"category_scores_gemma":[0.000018921291,0.00012998807,0.00004773825,0.00023700736,0.00003312867,0.00027767743,0.0000020309067,0.00022542823,0.00000857777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018011888,0.00000124424,0.00018651619,0.000003783049,0.00004003539,0.0000031215127,0.00010167275,0.9937507,0.0007249159,0.001605118,0.0012823018,0.0022988054],"study_design_scores_gemma":[0.00088299497,0.000035250847,0.0041175243,0.00019675239,0.00007551767,0.00033158212,0.00045392226,0.8972189,0.003887534,0.00069484045,0.091527455,0.00057776395],"about_ca_topic_score_codex":0.000012475892,"about_ca_topic_score_gemma":0.0050881286,"teacher_disagreement_score":0.9219462,"about_ca_system_score_codex":0.0004088873,"about_ca_system_score_gemma":0.00015935657,"threshold_uncertainty_score":0.53007597},"labels":[],"label_agreement":null},{"id":"W2062635160","doi":"10.13167/2013.6.7","title":"CONSTRUCTABILITY-BUILDABILITY-IZGRADIVOST","year":2013,"lang":"hr","type":"article","venue":"Elektronički časopis građevinskog fakulteta Osijek","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Constructability; Business; Engineering; Structural engineering","score_opus":0.006191138046828159,"score_gpt":0.19544669103340465,"score_spread":0.18925555298657648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062635160","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92571485,0.017789727,0.0035347117,0.003798508,0.009667022,0.003952871,0.0004932209,0.002026151,0.03302293],"genre_scores_gemma":[0.98749787,0.0011171226,0.005738485,0.0004671872,0.0013574581,0.00018233263,0.00022487008,0.0002610632,0.0031535914],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9923394,0.0005008338,0.00222059,0.0017412292,0.0010689342,0.002129028],"domain_scores_gemma":[0.9951363,0.0004594629,0.00043194476,0.0022110506,0.00082122145,0.00094002835],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.0005974604,0.0015882171,0.0014914096,0.0005246696,0.00072956906,0.000970122,0.0011632277,0.0009859608,0.011998048],"category_scores_gemma":[0.00034583968,0.0016047133,0.00089332997,0.0012277775,0.0013887768,0.0018342963,0.00023917963,0.0019855497,0.008055492],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013357974,0.0010554186,0.11051627,0.0022638687,0.0019298791,0.00003674593,0.0040294365,0.0016523093,0.029415386,0.14912485,0.081611186,0.61823106],"study_design_scores_gemma":[0.011638765,0.002153014,0.2116419,0.0016792448,0.0021273347,0.0013862125,0.013752408,0.055784624,0.027708609,0.0680084,0.5912224,0.0128970705],"about_ca_topic_score_codex":0.0011092777,"about_ca_topic_score_gemma":0.0002583852,"teacher_disagreement_score":0.605334,"about_ca_system_score_codex":0.0010394586,"about_ca_system_score_gemma":0.00038690143,"threshold_uncertainty_score":0.9996866},"labels":[],"label_agreement":null},{"id":"W2062801531","doi":"10.1680/mpal.11.00049","title":"Simulation of scheduling logic using dynamic functions","year":2013,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Critical path method; Probabilistic logic; Interdependence; Scheduling (production processes); Schedule; Dynamic priority scheduling; Function (biology); Mathematical optimization; Distributed computing; Systems engineering; Engineering; Artificial intelligence; Mathematics","score_opus":0.011204330017663227,"score_gpt":0.20484038485609066,"score_spread":0.19363605483842744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062801531","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7669894,0.0006177774,0.18520395,0.00012482518,0.0007640517,0.0013873888,0.0000064725937,0.00018587777,0.044720255],"genre_scores_gemma":[0.9973944,0.00003831506,0.0024604483,0.000008734029,0.000014212289,0.000021389107,0.0000016922245,0.000008331462,0.000052468808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992625,0.0000018648478,0.00032814816,0.000101111895,0.00020411385,0.00010222296],"domain_scores_gemma":[0.9995805,0.0000073643973,0.00013178283,0.000062139625,0.00019651931,0.000021667425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010253912,0.000116108364,0.00013526135,0.00013433171,0.000068020476,0.00001985817,0.00009683875,0.000050815917,0.000026151916],"category_scores_gemma":[0.000011222867,0.00009538201,0.000055404285,0.0002525931,0.000120483484,0.00044062774,0.000033701133,0.00007275886,7.602332e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054730117,0.000023749888,0.0002492362,0.00086925447,0.00009654743,1.4869874e-8,0.00009381524,0.76469374,0.017965987,0.21455976,0.000023423672,0.0014190102],"study_design_scores_gemma":[0.00039818254,0.00003503459,0.00065738446,0.00035682722,0.00014253946,0.0000012173051,0.0005846435,0.9837982,0.009651472,0.0035232177,0.00070034765,0.00015092416],"about_ca_topic_score_codex":0.000014935103,"about_ca_topic_score_gemma":0.000007201131,"teacher_disagreement_score":0.23040502,"about_ca_system_score_codex":0.000048856633,"about_ca_system_score_gemma":0.000005150879,"threshold_uncertainty_score":0.38895655},"labels":[],"label_agreement":null},{"id":"W2062942589","doi":"10.1139/l07-058","title":"Monitoring of concrete building construction","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Council","keywords":"Structural engineering; Stress (linguistics); Reinforced concrete; Forensic engineering; Deformation (meteorology); Building construction; Geotechnical engineering; Environmental science; Engineering; Materials science; Composite material","score_opus":0.0059901814417033855,"score_gpt":0.18556352276156762,"score_spread":0.17957334131986424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062942589","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76427895,0.0019095623,0.22679853,0.000010797918,0.0043010954,0.00003831767,0.00000351368,0.000040472176,0.0026187385],"genre_scores_gemma":[0.9931071,0.000029431143,0.006465957,0.0000016616613,0.00037216512,3.4757446e-7,2.2070172e-7,0.00001869371,0.0000044495914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992471,0.000003500464,0.00039303958,0.000043618307,0.00010481395,0.00020794352],"domain_scores_gemma":[0.9994203,0.000035108056,0.000078928504,0.00006726032,0.0001403162,0.00025813136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002411824,0.000095582924,0.00015794364,0.0004665093,0.000028402417,0.000019822006,0.00008905401,0.00007583644,0.000049877763],"category_scores_gemma":[0.000051118986,0.000106642976,0.000068891946,0.00021442621,0.000032117325,0.0001923443,0.0000018092197,0.00022299365,8.275895e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020772886,0.000001791572,0.074997276,0.00037178517,0.00041142787,0.00017860532,0.0013169157,0.40348366,0.4030276,0.02355976,0.0004522023,0.0921782],"study_design_scores_gemma":[0.0019332859,0.00023419698,0.06082079,0.0027215318,0.00019919469,0.004447412,0.0026855587,0.038099956,0.8488393,0.0010038862,0.03770686,0.0013080586],"about_ca_topic_score_codex":0.00010414912,"about_ca_topic_score_gemma":0.0016543336,"teacher_disagreement_score":0.44581166,"about_ca_system_score_codex":0.00015554504,"about_ca_system_score_gemma":0.00010278953,"threshold_uncertainty_score":0.43487743},"labels":[],"label_agreement":null},{"id":"W2064272282","doi":"10.4015/s1016237207000446","title":"APPLICATION OF RELEVANT CONSTRUCTION REGULATIONS FOR AN ERGONOMICAL AND SAFE WORK ENVIRONMENT","year":2007,"lang":"en","type":"article","venue":"Biomedical Engineering Applications Basis and Communications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Work (physics); Working environment; Architectural engineering; Productivity; Occupational safety and health; Work environment; Foundation (evidence); Engineering; Risk analysis (engineering); Business; Law; Mechanical engineering; Political science","score_opus":0.008494541129778379,"score_gpt":0.21369047794576235,"score_spread":0.20519593681598397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064272282","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017210744,0.0008560509,0.9805878,0.00034319784,0.000046170862,0.0005362,0.0000511822,0.00016092516,0.00020777424],"genre_scores_gemma":[0.8130325,0.00056439237,0.18555947,0.000008797305,0.00006118186,0.0005600751,0.00018510743,0.0000207358,0.000007747192],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911785,0.000010919743,0.00044084465,0.00018754405,0.00009428203,0.0001485746],"domain_scores_gemma":[0.9989069,0.00020512761,0.000066621156,0.00061688345,0.000049605558,0.00015485074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002661851,0.00013004999,0.00015560018,0.00017189876,0.00016274666,0.000020362844,0.00018084917,0.00013860293,0.000005215583],"category_scores_gemma":[0.00001626878,0.00014105286,0.000037431088,0.00025633821,0.00031077338,0.00009824223,0.000043945598,0.00012663142,0.0000021420537],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015235524,0.00011240253,0.0006291631,0.0000843753,0.000057308956,1.7411367e-8,0.0001473378,0.0013564981,0.018220361,0.2749805,0.00008103441,0.7043158],"study_design_scores_gemma":[0.0008903357,0.00012052405,0.037027203,0.000063495376,0.00016306022,0.00003915101,0.0005056604,0.5036549,0.002438718,0.004702254,0.4498011,0.000593649],"about_ca_topic_score_codex":0.00000924722,"about_ca_topic_score_gemma":0.00000589161,"teacher_disagreement_score":0.7958217,"about_ca_system_score_codex":0.000053056683,"about_ca_system_score_gemma":0.000012101125,"threshold_uncertainty_score":0.57519686},"labels":[],"label_agreement":null},{"id":"W2065594418","doi":"10.1061/(asce)0887-3801(2010)24:2(203)","title":"Automated Code Compliance Checking for Building Envelope Design","year":2010,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Envelope (radar); Building code; Building envelope; Building design; Computer science; Code (set theory); Representation (politics); Process (computing); Building information modeling; Software; Building model; Software engineering; Engineering; Programming language; Architectural engineering; Simulation; Set (abstract data type)","score_opus":0.022570997127181008,"score_gpt":0.2565851507594705,"score_spread":0.23401415363228953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065594418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25686032,0.00010418831,0.740725,0.000017870498,0.001802953,0.00008238816,8.9960076e-7,0.0002754766,0.00013089385],"genre_scores_gemma":[0.8038202,0.0000061788733,0.19587785,0.000006689694,0.00025446984,0.0000021120898,3.9760164e-7,0.000029572837,0.0000025298912],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989898,0.000009621375,0.00053970655,0.00008762733,0.00013230933,0.00024089124],"domain_scores_gemma":[0.99937785,0.00022463077,0.00012506651,0.00008666157,0.00012468129,0.00006111523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059809076,0.00014835497,0.0002464523,0.00027574837,0.000043175565,0.00006053558,0.00018142279,0.000097868244,0.0000068437084],"category_scores_gemma":[0.00014863673,0.00015559654,0.000074812684,0.00024101585,0.000012417783,0.00017595528,0.000012764123,0.00052648125,9.883178e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004928845,0.0000064446695,0.00037629425,0.00007622524,0.000022370648,0.0000041564736,0.00014645145,0.91407406,0.081175625,0.000728566,0.00017666907,0.0032081832],"study_design_scores_gemma":[0.00041001095,0.000025681027,0.003009329,0.00036860295,0.000008031551,0.00017632311,0.000018278808,0.98040885,0.014159207,0.00009214231,0.001163555,0.00015999998],"about_ca_topic_score_codex":9.1547946e-7,"about_ca_topic_score_gemma":0.000012867027,"teacher_disagreement_score":0.5469599,"about_ca_system_score_codex":0.000078017474,"about_ca_system_score_gemma":0.000032083837,"threshold_uncertainty_score":0.63450426},"labels":[],"label_agreement":null},{"id":"W2066517487","doi":"10.1061/41098(368)113","title":"Rapid Pier Delivery Using Precast Concrete Components","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Vancouver Coastal Health","funders":"","keywords":"Pier; Precast concrete; Engineering; Schedule; Civil engineering; Computer science","score_opus":0.017835412807951468,"score_gpt":0.20028754108900057,"score_spread":0.1824521282810491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066517487","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9688279,0.00003829876,0.0057883426,0.000009072833,0.0013733108,0.000045497527,0.0000028259462,0.00019647338,0.023718275],"genre_scores_gemma":[0.9949105,0.000007952465,0.0047654114,0.000028885885,0.000110272376,0.0000021492579,0.0000047577014,0.000009976214,0.00016009202],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970293,0.0000044903923,0.00009055092,0.00006122161,0.000055344266,0.000085465355],"domain_scores_gemma":[0.99983114,0.000008452269,0.000009034421,0.00008633268,0.000029470313,0.000035540503],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000027502034,0.00006190603,0.000054333817,0.000035471778,0.000035937024,0.000024720737,0.000040359115,0.00005922253,0.0011751733],"category_scores_gemma":[0.0000023967186,0.000057071087,0.000024669249,0.00004502576,0.000027569404,0.00011735242,0.000006558638,0.00012902293,0.00006908491],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003808119,0.0000010976951,0.00076218275,0.000007982956,0.000022994143,8.0480316e-7,0.000053469612,0.0002551637,0.9536667,0.002476069,0.00082432,0.04192543],"study_design_scores_gemma":[0.00049750076,0.000014921212,0.0029656328,0.000017263073,0.000023674818,0.00010434796,0.00010125748,0.7792813,0.1491855,0.00016858654,0.06729915,0.0003408485],"about_ca_topic_score_codex":0.000029827324,"about_ca_topic_score_gemma":0.00001331186,"teacher_disagreement_score":0.80448115,"about_ca_system_score_codex":0.000010273613,"about_ca_system_score_gemma":0.0000054107,"threshold_uncertainty_score":0.99973786},"labels":[],"label_agreement":null},{"id":"W2066635672","doi":"10.1061/(asce)co.1943-7862.0000907","title":"Identification of Invariant Average Weighted Haul Distance to Simplify Earthmoving Simulation Modeling in Planning Site Grading Operations","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Grid; Grading (engineering); Computer science; Heuristic; Simulation modeling; Industrial engineering; Simulation; Data mining; Operations research; Engineering; Artificial intelligence; Mathematics; Civil engineering","score_opus":0.007575520161491659,"score_gpt":0.20808722381658107,"score_spread":0.2005117036550894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066635672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39894077,0.000055053515,0.6005263,0.000020840731,0.00030970562,0.0000678084,0.0000010600961,0.00002394361,0.000054568456],"genre_scores_gemma":[0.98653233,0.0000598024,0.013305242,0.00000713914,0.0000690056,0.0000051734573,0.0000020485304,0.000012330671,0.0000069508114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990406,0.000017333443,0.0005989931,0.00009421551,0.00014485013,0.00010403212],"domain_scores_gemma":[0.99966997,0.000027368436,0.00008179849,0.000084296844,0.00008467504,0.00005189086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030843585,0.000103405655,0.00016508007,0.0005069118,0.00004466572,0.000056593944,0.000049048966,0.000042325322,0.000003032786],"category_scores_gemma":[0.000027478172,0.00011042095,0.00003347165,0.00025562968,0.000010011325,0.0003183333,0.000011570987,0.00012782641,7.1028376e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007736361,0.000004275571,0.0002788427,0.00009106628,0.000025864543,0.0000014779289,0.00026791063,0.9714256,0.0062555037,0.008531914,0.0000027392741,0.013107047],"study_design_scores_gemma":[0.00028444396,0.000017259415,0.0010760349,0.00023798835,0.000020033658,0.00002671225,0.00015109022,0.9968323,0.0007303848,0.00020313273,0.00031867233,0.00010193978],"about_ca_topic_score_codex":0.0000033783053,"about_ca_topic_score_gemma":0.0000043823784,"teacher_disagreement_score":0.5875915,"about_ca_system_score_codex":0.000060621016,"about_ca_system_score_gemma":0.000004987943,"threshold_uncertainty_score":0.45028356},"labels":[],"label_agreement":null},{"id":"W2066650466","doi":"10.1016/j.protcy.2014.10.127","title":"Building Information Modeling Implementation through Maturity Evaluation and Critical Success Factors Management","year":2014,"lang":"en","type":"article","venue":"Procedia Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Maturity (psychological); Building information modeling; Capability Maturity Model; Critical success factor; Engineering; Process management; Computer science; Knowledge management; Engineering management; Systems engineering; Operations management","score_opus":0.012447094419317703,"score_gpt":0.2925543820750289,"score_spread":0.2801072876557112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066650466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5617337,0.000059367856,0.4360577,0.00020500015,0.00023372403,0.0001888343,0.0000018883851,0.000406015,0.0011137722],"genre_scores_gemma":[0.98604393,0.00004186231,0.013740975,0.000021077607,0.000024552151,0.00010161046,0.000018583441,0.000007018758,3.7811222e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994161,0.000009196266,0.00020056166,0.00010086151,0.00013514844,0.00013813359],"domain_scores_gemma":[0.9997541,0.000013501862,0.000023607983,0.000082489394,0.00010903856,0.000017299906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013818276,0.000092685645,0.00007819631,0.00019785702,0.00007987605,0.000047717032,0.000059202863,0.00012195429,0.000023481705],"category_scores_gemma":[0.000049633858,0.00009342031,0.00001167628,0.00018565601,0.00003454925,0.0007338429,0.000024166586,0.000117298776,0.000004576745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029369849,0.0000044872813,0.0038948124,0.00019897627,0.000018547415,5.9715674e-8,0.00031966326,0.0025126855,0.00040397275,0.651551,0.000051620314,0.34104124],"study_design_scores_gemma":[0.0003584558,0.000025726535,0.0012758551,0.000023769158,0.00005003638,0.000010163535,0.0013966614,0.8519784,0.008047314,0.13531834,0.0013403231,0.00017491056],"about_ca_topic_score_codex":0.000009437408,"about_ca_topic_score_gemma":0.0000094517845,"teacher_disagreement_score":0.8494657,"about_ca_system_score_codex":0.000045038272,"about_ca_system_score_gemma":0.0000055070545,"threshold_uncertainty_score":0.38095698},"labels":[],"label_agreement":null},{"id":"W2067302756","doi":"10.1139/l02-030","title":"Computer-assisted construction methods knowledge management and selection","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Computer science; Construction management; Building information modeling; Key (lock); Context (archaeology); Project management; Automation; Systems engineering; Domain (mathematical analysis); Domain knowledge; Software engineering; Engineering management; Scheduling (production processes); Engineering; Database","score_opus":0.011122516540374898,"score_gpt":0.20464216745555233,"score_spread":0.19351965091517742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067302756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0148068555,0.004513356,0.96130145,0.000037743197,0.0030122136,0.000083245846,0.00000228895,0.0001039389,0.016138941],"genre_scores_gemma":[0.9463897,0.000121685654,0.053172633,0.000006227898,0.00023438879,0.0000021176036,4.1866878e-7,0.000018420873,0.000054419983],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994979,0.000015541338,0.00022694313,0.000061461156,0.000047009104,0.0001511421],"domain_scores_gemma":[0.9996197,0.000017683591,0.000035515826,0.00003911112,0.000066401466,0.00022156647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010799894,0.00010200545,0.00012655107,0.00043551516,0.000052672607,0.00005677673,0.000050972525,0.00005969026,0.00013851187],"category_scores_gemma":[0.000006384293,0.00011106626,0.000040039686,0.0002322744,0.000022077078,0.000161286,0.0000027735218,0.00017740048,0.0000034762124],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017936324,0.000006923878,0.0008156942,0.00020807369,0.0002643324,0.000028982662,0.00062994566,0.07531929,0.001644215,0.010340645,0.004964464,0.90577567],"study_design_scores_gemma":[0.00054131285,0.00007032242,0.0073284362,0.00022502194,0.00008238435,0.002938861,0.00017218987,0.88327444,0.0007789014,0.0001687782,0.1040914,0.00032794863],"about_ca_topic_score_codex":0.000018496186,"about_ca_topic_score_gemma":0.0033854085,"teacher_disagreement_score":0.9315828,"about_ca_system_score_codex":0.0001463112,"about_ca_system_score_gemma":0.00001633797,"threshold_uncertainty_score":0.45291507},"labels":[],"label_agreement":null},{"id":"W2067503067","doi":"10.3763/aedm.2010.idds1","title":"Challenges for Integrated Design and Delivery Solutions","year":2010,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Interoperability; Process (computing); Bridge (graph theory); Knowledge management; Workforce; Engineering; Process management; Integrated project delivery; Engineering management; Isolation (microbiology); Systems engineering; Project management; Computer science","score_opus":0.022808098381623735,"score_gpt":0.194623944328585,"score_spread":0.17181584594696128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067503067","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017864773,0.0011259102,0.9795292,0.00011147819,0.00034213104,0.0004024195,0.000002280741,0.0003774474,0.00024438475],"genre_scores_gemma":[0.7959378,0.0004944115,0.2032734,0.000011579917,0.00005037214,0.00016057273,0.0000036672918,0.000021737887,0.00004650056],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947757,0.000010225193,0.00011176151,0.00015453751,0.000051009003,0.00019488714],"domain_scores_gemma":[0.9997147,0.00009866368,0.0000095693385,0.000096601,0.000018356966,0.00006210808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015420912,0.00014491312,0.000096551055,0.00013747839,0.00007667307,0.000043967342,0.000050350034,0.000050320403,0.0000038276007],"category_scores_gemma":[0.000010492594,0.00013012828,0.000023397894,0.000060855993,0.000027595785,0.000064402295,0.000018195744,0.00014185613,0.0000015954083],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002000892,0.000004964907,0.0000022128793,0.00015153523,0.00009617068,0.0000018123812,0.00019978128,0.2159853,0.012415663,0.024561647,0.0001746622,0.74638623],"study_design_scores_gemma":[0.00034524905,0.000061533305,0.0006598774,0.000034536388,0.000039479593,0.00005290539,0.00007621286,0.98889846,0.0015316023,0.0018936347,0.0061684153,0.00023807412],"about_ca_topic_score_codex":0.0000029565238,"about_ca_topic_score_gemma":0.000004639826,"teacher_disagreement_score":0.778073,"about_ca_system_score_codex":0.000010473499,"about_ca_system_score_gemma":0.000003002317,"threshold_uncertainty_score":0.5306477},"labels":[],"label_agreement":null},{"id":"W2067740563","doi":"10.5539/mas.v5n4p123","title":"Development of Production Rates Database for Substructure Activities by Work Sampling","year":2011,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Database; Production (economics); Sampling (signal processing); Work (physics); Duration (music); Scheduling (production processes); Statistics; Operations management; Mathematics; Engineering","score_opus":0.03904838676862325,"score_gpt":0.23481465772881505,"score_spread":0.19576627096019178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067740563","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48071826,0.000031460087,0.51826626,0.0000018565117,0.00022336848,0.00012652729,0.0000056016966,0.00006072901,0.0005659282],"genre_scores_gemma":[0.89114183,0.0000021922974,0.10873952,0.000002952486,0.000021881639,0.000059351638,0.0000085072115,0.0000072666317,0.000016503467],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99940526,0.0000013342076,0.00013736764,0.00017763938,0.00013594513,0.00014242313],"domain_scores_gemma":[0.99976295,0.0000072861058,0.000034329696,0.00012975812,0.000036099354,0.000029573192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015261376,0.00007934089,0.000072557996,0.000067421184,0.00014453664,0.000020706872,0.00012652595,0.000027770748,0.000011269633],"category_scores_gemma":[0.000006988674,0.00007295205,0.000010821715,0.00022062313,0.00013859344,0.00021322301,0.000014151067,0.00005421035,0.0000010565932],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000134631355,0.0000055090063,0.000059064812,0.000024606055,0.0000038995317,6.9277672e-9,0.0023017589,0.00023642847,0.9387107,0.0014376382,0.00005548331,0.057151426],"study_design_scores_gemma":[0.000056222783,0.0000021852281,0.0003307352,0.000011734668,0.0000032524229,7.0401967e-7,0.00044166288,0.005044844,0.9923549,0.0012099933,0.00044658774,0.000097154996],"about_ca_topic_score_codex":9.63039e-7,"about_ca_topic_score_gemma":0.0000053577305,"teacher_disagreement_score":0.41042355,"about_ca_system_score_codex":0.00003974568,"about_ca_system_score_gemma":0.000044831486,"threshold_uncertainty_score":0.29748982},"labels":[],"label_agreement":null},{"id":"W2068600822","doi":"10.1139/l08-083","title":"Geographic information system–based visualization system for planning and monitoring of repetitive construction projects","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visualization; Schedule; Geographic information system; Computer science; Pipeline (software); Systems engineering; Information system; Representation (politics); Software engineering; Engineering; Data mining; Geography; Cartography","score_opus":0.008442333832449469,"score_gpt":0.18271228440431966,"score_spread":0.1742699505718702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068600822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46427992,0.00066182535,0.53242964,0.0000041244234,0.0018588138,0.0002004207,0.000020778618,0.00008656849,0.00045795523],"genre_scores_gemma":[0.9981186,0.000007310378,0.0017186793,8.8975247e-7,0.00012641322,0.000009639509,0.000004489939,0.000013355416,6.331896e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993205,0.00000798332,0.00039581052,0.000045281704,0.000099509045,0.00013092268],"domain_scores_gemma":[0.99935985,0.000027736776,0.00014986962,0.00005174742,0.00028308353,0.00012771245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013230705,0.00009849409,0.00016762815,0.00069846015,0.00007988374,0.000027202064,0.00004182969,0.00007662992,0.0000013725737],"category_scores_gemma":[0.00004414282,0.00010707722,0.000048613456,0.00020281917,0.000028538187,0.00043663336,0.0000012243888,0.00009340409,1.4618189e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029073237,0.0000021257517,0.093860194,0.0035422957,0.00015655789,0.00002132483,0.0025666074,0.8850459,0.0021477053,0.0107187275,0.00006514864,0.0018443651],"study_design_scores_gemma":[0.0022490358,0.00027896895,0.04356851,0.007229589,0.00016972165,0.0032926037,0.01092568,0.8976836,0.032351308,0.000017276134,0.0015922845,0.0006414166],"about_ca_topic_score_codex":0.00007684089,"about_ca_topic_score_gemma":0.00013288023,"teacher_disagreement_score":0.5338387,"about_ca_system_score_codex":0.00017453621,"about_ca_system_score_gemma":0.00015549496,"threshold_uncertainty_score":0.43664825},"labels":[],"label_agreement":null},{"id":"W2068765329","doi":"10.1016/j.aei.2008.05.003","title":"IT-based approach for effective management of project changes: A change management system (CMS)","year":2008,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Control (management); Project management; Knowledge base; Selection (genetic algorithm); Knowledge management; Project management triangle; Change control; Computer science; Engineering; Process management; Project planning; Risk analysis (engineering); Engineering management; Systems engineering; Business; Artificial intelligence","score_opus":0.014111106241306666,"score_gpt":0.20906966946286737,"score_spread":0.19495856322156072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068765329","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024103927,0.00010446408,0.98911846,0.000004041834,0.0003550325,0.001920957,0.000025541523,0.0004979454,0.005563139],"genre_scores_gemma":[0.5152795,0.00015806682,0.480585,0.000026687008,0.000054670894,0.003732877,0.00007798668,0.00004800726,0.000037212543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991887,0.0000033951426,0.00033287908,0.00008131617,0.00016327061,0.00023043818],"domain_scores_gemma":[0.9996142,0.000020215848,0.00006709661,0.0002117378,0.000052538115,0.00003422611],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008002526,0.00020096934,0.00021778965,0.00023886867,0.000046557314,0.000009074765,0.000115066156,0.0000626744,8.468945e-7],"category_scores_gemma":[0.0000017148449,0.00020095705,0.000068080335,0.00030000968,0.000016989208,0.0002085629,0.00001653806,0.00007932483,0.0000025824477],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002520745,0.000021680036,0.000008895933,0.017051125,0.00024710695,0.0000025514912,0.0016964583,0.9004906,0.000074973424,0.0076616397,0.00015802508,0.07256175],"study_design_scores_gemma":[0.00090770895,0.00007022258,0.0000804885,0.0004357748,0.00005415118,0.00001476488,0.0015034188,0.98013204,0.0023552685,0.0000018090108,0.014201604,0.00024272007],"about_ca_topic_score_codex":0.0000010132676,"about_ca_topic_score_gemma":3.4649418e-7,"teacher_disagreement_score":0.5128691,"about_ca_system_score_codex":0.00014743287,"about_ca_system_score_gemma":0.000003817195,"threshold_uncertainty_score":0.81947905},"labels":[],"label_agreement":null},{"id":"W2070160092","doi":"10.1115/jrc2014-3750","title":"Validation of the Accessible Lavatory Recommendations for the Next Generation of Accessible Passenger Rail Cars","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Computer science; Work (physics); Scale (ratio); Engineering","score_opus":0.07397941889198047,"score_gpt":0.273512157439299,"score_spread":0.19953273854731857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070160092","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6374548,0.00022024149,0.34412053,0.0028227402,0.0037920584,0.00072484673,0.000033068725,0.00014352183,0.010688164],"genre_scores_gemma":[0.9978558,0.00005625643,0.0014762802,0.000053773954,0.00015227056,0.00010608162,0.000019538655,0.00001054017,0.00026944783],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994755,0.000036243964,0.00025360016,0.0000714202,0.0000944014,0.00006883416],"domain_scores_gemma":[0.99942505,0.00012116632,0.000086300286,0.00021389162,0.00014151495,0.000012089093],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020100821,0.00006680561,0.00008056004,0.000043836928,0.000107736145,0.000037825106,0.0001453001,0.000048562084,0.00018595332],"category_scores_gemma":[0.000039827006,0.000039641473,0.00006303366,0.00018094532,0.000032515447,0.0003538825,0.000013118176,0.0000590297,0.0000018372481],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000107284695,0.0000448846,0.0041400725,0.00015584324,0.00015142385,7.449897e-9,0.00066199113,0.035858937,0.47221556,0.08599413,0.07008109,0.33068532],"study_design_scores_gemma":[0.00024525783,0.000015046305,0.002510509,0.000019988865,0.00004668695,7.5448213e-7,0.0003042512,0.17080551,0.79477,0.0007913056,0.030408856,0.00008181113],"about_ca_topic_score_codex":0.000039492155,"about_ca_topic_score_gemma":0.00008122774,"teacher_disagreement_score":0.36040097,"about_ca_system_score_codex":0.000018042261,"about_ca_system_score_gemma":0.000022259801,"threshold_uncertainty_score":0.20360585},"labels":[],"label_agreement":null},{"id":"W2071095200","doi":"10.1108/09699980910970851","title":"Integrating numerical tools in underground construction process","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Process (computing); Frame (networking); Reduction (mathematics); Computer science; Cost reduction; Pre-construction services; Construction management; Quality (philosophy); Excavation; Control (management); Industrial engineering; Project management; Construction engineering; Systems engineering; Engineering; Civil engineering; Project planning","score_opus":0.006681775821354997,"score_gpt":0.21145156237560617,"score_spread":0.20476978655425118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071095200","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5370835,0.00014580684,0.44549727,0.000317813,0.00212979,0.0005518401,0.0000051507595,0.0014814218,0.012787396],"genre_scores_gemma":[0.95914066,0.000022937833,0.040529825,0.00003758867,0.00014930328,0.000050625124,0.000017442484,0.00002617404,0.000025438218],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853665,0.000022366012,0.0004886598,0.00031847126,0.00024553435,0.00038830898],"domain_scores_gemma":[0.999585,0.00003467769,0.000053829026,0.00020147313,0.000036341407,0.00008870094],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000097467775,0.0003187416,0.00025038634,0.0005139199,0.000080183,0.00014460883,0.00015413229,0.00009809694,0.000062427396],"category_scores_gemma":[0.000022596161,0.00032695424,0.000083862775,0.0007079753,0.00005550638,0.00039969914,0.000016072545,0.0004575996,0.000017368582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016313035,0.000012097777,0.00043589255,0.000087286135,0.000045351808,0.000011206327,0.00020172675,0.26651913,0.00094299787,0.074683726,0.0000208369,0.65702343],"study_design_scores_gemma":[0.0034435305,0.00031844215,0.06731626,0.0010064689,0.00013641262,0.0026079589,0.0045400583,0.8674334,0.0071707657,0.036746413,0.0064617223,0.00281854],"about_ca_topic_score_codex":0.000005546665,"about_ca_topic_score_gemma":0.00000573337,"teacher_disagreement_score":0.6542049,"about_ca_system_score_codex":0.00023808335,"about_ca_system_score_gemma":0.000011467719,"threshold_uncertainty_score":0.9999182},"labels":[],"label_agreement":null},{"id":"W2072049602","doi":"10.1139/l00-075","title":"A fuzzy expert system for design performance prediction and evaluation","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Fuzzy logic; Expert system; Computer science; Key (lock); Data mining; Context (archaeology); Machine learning; Measure (data warehouse); Artificial intelligence; Industrial engineering; Engineering","score_opus":0.01601565219101328,"score_gpt":0.191659534505783,"score_spread":0.1756438823147697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072049602","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27329835,0.0053500636,0.71499026,0.00005042639,0.0032699325,0.00034536002,0.000008658863,0.00009521063,0.0025917396],"genre_scores_gemma":[0.99834716,0.00009100571,0.0012202209,0.0000039059223,0.00029195086,0.00002012281,0.0000015022041,0.000015893045,0.000008227802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952596,0.0000073832994,0.00019860345,0.00004615781,0.000088553024,0.00013332073],"domain_scores_gemma":[0.9995951,0.000019275605,0.000031332875,0.0000463239,0.00014382772,0.00016415812],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028676153,0.000076606215,0.0000921232,0.00022737584,0.00005070418,0.000041345236,0.000040956824,0.000053373245,0.000014760288],"category_scores_gemma":[0.000025776946,0.00007874884,0.000027365797,0.00009341799,0.000007851972,0.00026517018,7.3452827e-7,0.0000822904,6.128338e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000095475425,9.983535e-7,0.00064675394,0.00010272268,0.000048384823,0.00000413293,0.00040773142,0.95862067,0.0025605669,0.00045921962,0.0012334642,0.035905816],"study_design_scores_gemma":[0.00040390182,0.000064010645,0.0017294026,0.00022747046,0.00002945502,0.00054725475,0.00016200177,0.9889467,0.000738027,0.00003653006,0.0070148227,0.00010045661],"about_ca_topic_score_codex":0.000028584634,"about_ca_topic_score_gemma":0.001335629,"teacher_disagreement_score":0.72504884,"about_ca_system_score_codex":0.00025344995,"about_ca_system_score_gemma":0.00011565326,"threshold_uncertainty_score":0.32112846},"labels":[],"label_agreement":null},{"id":"W2072631216","doi":"10.1016/j.aei.2007.03.003","title":"A geometric modelling framework for conceptual structural design from early digital architectural models","year":2007,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Process (computing); Conceptual design; Representation (politics); Architectural geometry; Computer science; Design process; Conceptual model; Systems engineering; Architectural technology; Hierarchy; Interdependence; Software engineering; Architecture; Engineering; Work in process; Software; Software development; Human–computer interaction; Programming language; Database","score_opus":0.016351385556920506,"score_gpt":0.2081436789079392,"score_spread":0.1917922933510187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072631216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23989914,0.00017302315,0.7584905,0.0000014157665,0.00057428674,0.00022405048,0.00005370522,0.0004776434,0.00010620802],"genre_scores_gemma":[0.54825634,0.0000062264457,0.45157033,0.000007409385,0.000083447936,0.000015615704,0.000030429655,0.000026569694,0.0000036398053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987794,0.0000016717681,0.00052442536,0.000093688686,0.00018706651,0.00041373528],"domain_scores_gemma":[0.9992036,0.00036630486,0.00006195183,0.00017951458,0.000073757794,0.00011484967],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007442473,0.00025292838,0.00021125775,0.00025330458,0.00006242513,0.000112236645,0.00015502119,0.00015187703,0.00000524332],"category_scores_gemma":[0.000043934837,0.0002551541,0.00008605153,0.00034779904,0.000032083306,0.0011352078,0.000015061642,0.00031434675,0.0000071616882],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018459588,0.0000011527411,0.000009072304,0.000026604046,0.000035068333,3.2383605e-7,0.0014097583,0.928159,0.000059518392,0.01169025,0.0000033792628,0.058587443],"study_design_scores_gemma":[0.00032453585,0.00004081582,0.000034985525,0.000052049036,0.000012292496,0.000008707123,0.00032247446,0.9835559,0.001921678,0.013125317,0.0002859895,0.0003152631],"about_ca_topic_score_codex":0.0000025989846,"about_ca_topic_score_gemma":3.5470072e-7,"teacher_disagreement_score":0.30835718,"about_ca_system_score_codex":0.00009874504,"about_ca_system_score_gemma":0.000010869093,"threshold_uncertainty_score":0.99999005},"labels":[],"label_agreement":null},{"id":"W2072810478","doi":"10.3846/13923730.2011.574343","title":"APPLICATION OF NEW INFORMATION TECHNOLOGY ON CONCRETE: AN OVERVIEW / NAUJŲ INFORMACINIŲ TECHNOLOGIJŲ NAUDOJIMAS RUOŠIANT BETONĄ. APŽVALGA","year":2011,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Information technology; Variety (cybernetics); Computer science; Liquid desiccant; Engineering; Artificial intelligence; Mechanical engineering; Air conditioning","score_opus":0.011239761826034601,"score_gpt":0.20237907764385163,"score_spread":0.19113931581781704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072810478","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15709832,0.0034458202,0.82099944,0.00021359991,0.0012719779,0.0007241758,0.000008848333,0.0007636427,0.015474183],"genre_scores_gemma":[0.9897369,0.0022129787,0.007960542,0.00002061144,0.00003342665,0.000011733925,0.0000029660664,0.000010425766,0.000010416778],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999225,0.0000029697267,0.00045528336,0.00005360566,0.00014715233,0.00011594554],"domain_scores_gemma":[0.9995492,0.00000540047,0.00016655406,0.00015454701,0.00006734091,0.00005692623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013957993,0.00012571913,0.00018286642,0.0005897337,0.000021530124,0.000015611666,0.00013701055,0.00010588674,0.0000126302375],"category_scores_gemma":[0.0000097062075,0.00011286571,0.0000407833,0.00026302718,0.000022344902,0.00047180426,0.000022518769,0.00018164737,0.0000039135375],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044111068,0.000015565947,0.0002469085,0.00069941604,0.00023014376,0.0000039998504,0.0006530169,0.021875434,0.0013462255,0.24168508,0.00052621716,0.7326739],"study_design_scores_gemma":[0.0062545803,0.0034488111,0.01885622,0.002155579,0.0006365669,0.00070447556,0.005439616,0.41568148,0.06740905,0.011800808,0.4658294,0.0017834048],"about_ca_topic_score_codex":0.000009014689,"about_ca_topic_score_gemma":0.0000065257827,"teacher_disagreement_score":0.83263856,"about_ca_system_score_codex":0.00004277343,"about_ca_system_score_gemma":0.000008326266,"threshold_uncertainty_score":0.46025303},"labels":[],"label_agreement":null},{"id":"W2073954953","doi":"10.1139/l07-029","title":"Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Truck; Decision support system; Computer science; Software; Key (lock); Tracking (education); Discrete event simulation; Tracking system; Simulation software; Event (particle physics); Real-time computing; Simulation; Engineering; Artificial intelligence","score_opus":0.007138230938801997,"score_gpt":0.2180601060527754,"score_spread":0.2109218751139734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073954953","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060929395,0.0003476565,0.937853,0.000023028813,0.0004088727,0.00012472736,0.00003720342,0.00007604149,0.00020008071],"genre_scores_gemma":[0.92891383,0.000018758163,0.07084025,0.000009088547,0.00013464747,0.000004451441,0.000028877539,0.00003638069,0.000013734055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990415,0.0000042191023,0.0004869711,0.00010180731,0.00009426134,0.00027124476],"domain_scores_gemma":[0.9992371,0.0001673885,0.00006383183,0.00007174447,0.00022592986,0.00023398713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003649355,0.00014645189,0.000192557,0.00056263874,0.00015165102,0.00011065987,0.00008812025,0.00015446208,0.0000475155],"category_scores_gemma":[0.00020643018,0.00015458533,0.000040666047,0.00025573085,0.000025655436,0.00038388153,0.0000036401127,0.0002206899,6.0466846e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061082483,5.248806e-7,0.00020281147,0.000013564679,0.000026222637,0.000009017289,0.00021644146,0.98480606,0.008344387,0.00021651246,0.0002908179,0.005867532],"study_design_scores_gemma":[0.0004064571,0.00005369934,0.00009858582,0.00019549111,0.000021737562,0.000119229684,0.00022681407,0.99471563,0.002125012,0.00003734019,0.0018393673,0.0001606306],"about_ca_topic_score_codex":0.00007179225,"about_ca_topic_score_gemma":0.0016956065,"teacher_disagreement_score":0.8679844,"about_ca_system_score_codex":0.00017238119,"about_ca_system_score_gemma":0.000116349125,"threshold_uncertainty_score":0.6303807},"labels":[],"label_agreement":null},{"id":"W2077325571","doi":"10.1504/ijspm.2010.032658","title":"SPS tools for capital project planning analysis","year":2010,"lang":"en","type":"article","venue":"International Journal of Simulation and Process Modelling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Restructuring; Duration (music); Planner; Operations research; Capital (architecture); Scale (ratio); Engineering; Computer science; Transport engineering; Business; Finance; Artificial intelligence","score_opus":0.0397510319046815,"score_gpt":0.3270855069535241,"score_spread":0.28733447504884263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077325571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44995022,0.000057604895,0.549375,0.000018977978,0.000401466,0.000036052403,0.0000055635082,0.000014308502,0.00014077955],"genre_scores_gemma":[0.9925547,0.000015088821,0.0070322407,0.000015754826,0.00034658413,0.0000034571995,0.000013068947,0.000008070458,0.000010991915],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938923,0.0000038805388,0.00029378763,0.00006375999,0.00018690166,0.00006242944],"domain_scores_gemma":[0.99917585,0.000109743996,0.00011550532,0.000029356863,0.00053978054,0.000029778676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014187777,0.00007051979,0.00010877063,0.00032924724,0.000038512455,0.00015221052,0.00008439495,0.000056904966,0.000016336018],"category_scores_gemma":[0.000035132616,0.000063832136,0.00007749507,0.0001088121,0.000013933455,0.0006160437,0.0000032640828,0.00015304456,3.148812e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003762823,0.0000054128354,0.00064544985,0.0000105112895,0.00020915689,7.8297086e-7,0.0007167649,0.9834382,0.0003983669,0.0008286976,0.0000036970948,0.013705364],"study_design_scores_gemma":[0.00027059467,0.000014471319,0.00010857436,0.000017959968,0.00007518212,0.00001588574,0.0002354189,0.9950749,0.0005749556,0.002487199,0.0010532652,0.00007156043],"about_ca_topic_score_codex":0.000001696074,"about_ca_topic_score_gemma":0.0000023836292,"teacher_disagreement_score":0.5426045,"about_ca_system_score_codex":0.00001342574,"about_ca_system_score_gemma":0.000024673936,"threshold_uncertainty_score":0.2602999},"labels":[],"label_agreement":null},{"id":"W2077547847","doi":"10.1061/41109(373)36","title":"Spatial Trajectory Analysis for Cranes Operations on Construction Sites","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Trajectory; Lift (data mining); Object (grammar); Computer science; Position (finance); Process (computing); Boom; Path (computing); Point (geometry); Set (abstract data type); Mathematics; Artificial intelligence; Engineering; Data mining; Geometry","score_opus":0.008653787106465183,"score_gpt":0.2145366242066289,"score_spread":0.2058828371001637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077547847","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6225479,0.000005522805,0.3698045,0.00007278229,0.00094330666,0.00012081549,0.000022205417,0.00026475498,0.006218178],"genre_scores_gemma":[0.9894043,0.0000030218075,0.01001841,0.00002637803,0.0002079527,0.000046199577,0.00005332381,0.000007798948,0.0002326019],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996556,0.000004544903,0.00011909745,0.00009288195,0.00005456458,0.000073286225],"domain_scores_gemma":[0.99977887,0.000028306034,0.000007307389,0.00009969024,0.00005706126,0.000028770843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003281559,0.00007264939,0.000083941966,0.00016267755,0.00008438754,0.000043064025,0.000032959113,0.00007130309,0.00082970463],"category_scores_gemma":[0.000013688949,0.0000643412,0.0000854771,0.00016226967,0.000031408694,0.0000852908,0.0000012781175,0.000091863985,0.000018302586],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003561285,0.000051555224,0.018861642,0.000033955752,0.00083489006,3.7539834e-7,0.00029911747,0.18923096,0.44905528,0.20383464,0.001665751,0.13609621],"study_design_scores_gemma":[0.00043982815,0.000061177925,0.01498778,0.000002729305,0.00029320497,0.000010405056,0.00023768614,0.8535863,0.12263008,0.00062318693,0.006828903,0.0002987151],"about_ca_topic_score_codex":0.000054736283,"about_ca_topic_score_gemma":0.004076266,"teacher_disagreement_score":0.66435534,"about_ca_system_score_codex":0.000009347447,"about_ca_system_score_gemma":0.000008518342,"threshold_uncertainty_score":0.90846837},"labels":[],"label_agreement":null},{"id":"W2078284897","doi":"10.5555/2429759.2430281","title":"Towards the smart construction site: improving productivity and safety of construction projects using multi-agent systems, real-time simulation and automated machine control","year":2012,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Building information modeling; Control (management); Construction site safety; Computer science; Construction management; Systems engineering; Construction industry; Engineering; Risk analysis (engineering); Construction engineering; Civil engineering; Artificial intelligence; Operations management","score_opus":0.015681307414351024,"score_gpt":0.23515451093214135,"score_spread":0.21947320351779032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078284897","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8952586,0.0003819055,0.10191363,0.000020142636,0.0007812575,0.00082849286,0.000039478608,0.00051475567,0.00026172426],"genre_scores_gemma":[0.99296516,0.00002728126,0.0068318704,0.0000026682362,0.00010973814,0.000015767177,0.000013508899,0.000019499887,0.000014511172],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896383,0.00012041921,0.0003891229,0.00018088684,0.00014971913,0.00019604471],"domain_scores_gemma":[0.99941874,0.00006377534,0.00015489897,0.00015785234,0.00014167807,0.00006306306],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004187666,0.00018540147,0.00024209643,0.00010966534,0.00017637006,0.000053568412,0.00002936224,0.000119696284,0.000013743445],"category_scores_gemma":[0.000052914897,0.00013928965,0.000029075201,0.00017155717,0.00018730857,0.000515974,0.000018560799,0.0001224424,0.0000013937012],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029731347,0.00009264789,0.20634945,0.0011434391,0.0004000724,6.856867e-7,0.002018527,0.16409141,0.47096843,0.006115935,0.000024551384,0.14849755],"study_design_scores_gemma":[0.0007053565,0.000020288286,0.02653687,0.00003528031,0.00009001554,0.00017476107,0.00034476048,0.96894264,0.002944388,0.000006548865,0.000048489153,0.00015059095],"about_ca_topic_score_codex":0.00072796206,"about_ca_topic_score_gemma":0.000025783735,"teacher_disagreement_score":0.80485123,"about_ca_system_score_codex":0.00009897339,"about_ca_system_score_gemma":0.000030833955,"threshold_uncertainty_score":0.56800675},"labels":[],"label_agreement":null},{"id":"W2078805444","doi":"10.2316/journal.206.2008.3.206-3065","title":"AUTOMATED REAL-TIME MOTION PLANNING AND CONTROL OF CONSTRUCTION EQUIPMENT MECHANISM","year":2008,"lang":"en","type":"article","venue":"International Journal of Robotics and Automation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mechanism (biology); Computer science; Motion (physics); Control (management); Real-time computing; Artificial intelligence","score_opus":0.008226281094036055,"score_gpt":0.22200889318183334,"score_spread":0.21378261208779728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078805444","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65356725,0.00013771855,0.34495342,0.00013839388,0.00079040974,0.000057832636,0.00000716395,0.00010270496,0.00024509375],"genre_scores_gemma":[0.98880845,0.00027924223,0.010796864,0.000008212927,0.0000858676,8.784085e-7,0.000006337169,0.0000070892474,0.0000070465107],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924934,0.000019036721,0.00039419063,0.000052811694,0.00022801472,0.000056578487],"domain_scores_gemma":[0.999379,0.000031903917,0.00023518864,0.000030972482,0.00028666266,0.00003630277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011943066,0.00007679121,0.00013803756,0.00020104424,0.00003815942,0.000025047742,0.000046839064,0.00005909488,0.000012789547],"category_scores_gemma":[0.00001805457,0.00007247172,0.000031426574,0.00004670374,0.00004821767,0.00026855295,0.0000072596995,0.00007068085,9.879478e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014497944,0.00008816767,0.010271249,0.00010476196,0.000795735,0.00005223356,0.0018703912,0.45487988,0.39234295,0.06430369,0.0003768573,0.07476909],"study_design_scores_gemma":[0.0009472919,0.00007759328,0.015487887,0.00012436544,0.000035533263,0.001244313,0.000102240636,0.9704883,0.008943827,0.0024351752,0.000024081792,0.000089392655],"about_ca_topic_score_codex":0.000003626896,"about_ca_topic_score_gemma":2.1692678e-7,"teacher_disagreement_score":0.51560843,"about_ca_system_score_codex":0.00004690498,"about_ca_system_score_gemma":0.000018047811,"threshold_uncertainty_score":0.29553106},"labels":[],"label_agreement":null},{"id":"W2080802427","doi":"10.1111/0885-9507.00215","title":"A Hybrid AL‐Based System for Site Layout Planning in Construction","year":2001,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Vagueness; Closeness; Process (computing); Computer science; Knowledge base; Plan (archaeology); Fuzzy logic; Genetic algorithm; Artificial intelligence; Machine learning; Mathematics","score_opus":0.0046856972557643385,"score_gpt":0.18210162589440074,"score_spread":0.1774159286386364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080802427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4174255,0.0002423621,0.58043987,0.000016326065,0.0011042766,0.00015457912,0.000013434975,0.00041078104,0.00019286049],"genre_scores_gemma":[0.97721934,0.000012958021,0.02225009,0.00005226506,0.0003389127,0.00004507572,0.000038280275,0.000039898878,0.000003163753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898106,0.000010449061,0.00034198197,0.00025673743,0.00010295539,0.00030683322],"domain_scores_gemma":[0.9996112,0.000059826256,0.00004326027,0.0001502443,0.000043793727,0.00009170527],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008259809,0.0002688112,0.00027644236,0.0003073833,0.000066225555,0.00009235474,0.000085101026,0.00010601421,0.000010177007],"category_scores_gemma":[0.000008905269,0.0002810443,0.00006150385,0.0001931768,0.000026040165,0.000230523,0.000017727469,0.00024422535,0.0000016846565],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017327839,0.000002903611,0.0042421794,0.00024982897,0.000026030155,0.000013616431,0.0001258034,0.9685243,0.0026541909,0.0015380328,0.00046021616,0.022145566],"study_design_scores_gemma":[0.0008172471,0.000037577942,0.007805192,0.00030264488,0.000013001056,0.00032762554,0.000049859835,0.98068076,0.0010196748,0.00011213927,0.008535879,0.00029840507],"about_ca_topic_score_codex":0.0000050119165,"about_ca_topic_score_gemma":0.0000044261883,"teacher_disagreement_score":0.55979383,"about_ca_system_score_codex":0.000120280594,"about_ca_system_score_gemma":0.000016266635,"threshold_uncertainty_score":0.9999642},"labels":[],"label_agreement":null},{"id":"W2080988885","doi":"10.1139/l04-115","title":"The application of knowledge management to support the sustainable analysis of urban transportation infrastructure","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Monorail; Status quo; Cost–benefit analysis; Transport engineering; Sustainability; Sample (material); Computer science; Risk analysis (engineering); Business; Environmental economics; Engineering; Civil engineering; Economics","score_opus":0.0022149493239353936,"score_gpt":0.17470679046894463,"score_spread":0.17249184114500923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080988885","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27432457,0.0032563456,0.7070232,0.0005071161,0.00087536813,0.00061978266,0.000055558485,0.000049532435,0.013288563],"genre_scores_gemma":[0.9995339,0.00002544697,0.00026528398,0.0000066891193,0.000065641245,0.0000068543663,0.0000041828407,0.000009729106,0.00008228535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993504,0.0000059113045,0.0003571493,0.00004330157,0.00009659106,0.00014659586],"domain_scores_gemma":[0.9994788,0.000023054055,0.00007925659,0.00012915034,0.00017987746,0.000109814944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018839678,0.00007592843,0.00013704834,0.000437699,0.000050266033,0.000017603412,0.0001745791,0.000035086436,0.00003430602],"category_scores_gemma":[0.000009595568,0.00005549438,0.00009498177,0.0007746561,0.000020171534,0.00009527293,0.000001661411,0.00010769327,6.449677e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002689893,0.0000015777279,0.001212157,0.000049170732,0.00034557967,0.0000012027518,0.0013199465,0.9537043,0.00027446818,0.02348626,0.0015671348,0.018035503],"study_design_scores_gemma":[0.00038525404,0.00008841649,0.15136935,0.00007480448,0.0012014856,0.000017343255,0.004228495,0.198813,0.0029631215,0.00024065787,0.640321,0.00029701786],"about_ca_topic_score_codex":0.00009936608,"about_ca_topic_score_gemma":0.049946904,"teacher_disagreement_score":0.7548913,"about_ca_system_score_codex":0.00013437944,"about_ca_system_score_gemma":0.00007874703,"threshold_uncertainty_score":0.9673891},"labels":[],"label_agreement":null},{"id":"W2081977149","doi":"10.1061/(asce)0887-3801(2005)19:3(277)","title":"Framework for Building Intelligent Simulation Models of Construction Operations","year":2005,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Simulation modeling; Obstacle; Randomness; Systems engineering; Modeling and simulation; Industrial engineering; Engineering; Simulation","score_opus":0.018094006715734925,"score_gpt":0.2641517412842484,"score_spread":0.2460577345685135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081977149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22991611,0.00022622343,0.76910174,0.000019280178,0.0005769726,0.00006727343,0.0000010639744,0.000033669745,0.000057666843],"genre_scores_gemma":[0.7114377,0.000019973448,0.28827566,0.0000033039596,0.00024820588,0.0000010797648,4.8744687e-7,0.000012998781,5.7235917e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990398,0.000008109834,0.00064861675,0.000060152146,0.00012220268,0.000121117446],"domain_scores_gemma":[0.999437,0.00020148115,0.00009714487,0.0000650097,0.00016528017,0.000034136097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000252463,0.00009915052,0.00019601193,0.00032007197,0.0000253506,0.000024327403,0.000078548095,0.000085255844,0.0000067108854],"category_scores_gemma":[0.000096633936,0.000105814346,0.00008401005,0.00020108058,0.000011422392,0.00028820435,0.000007475294,0.00023623997,2.3794247e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046417053,0.000008280342,0.000074304604,0.000046625984,0.0000217176,1.8488743e-7,0.00031995223,0.94708234,0.0020168095,0.03198791,0.0000035286992,0.01843372],"study_design_scores_gemma":[0.00018544473,0.000024823046,0.00011079235,0.00035377187,0.00001163199,0.000026038164,0.00007728801,0.99137926,0.0056880284,0.0018492297,0.00020409856,0.00008961293],"about_ca_topic_score_codex":0.0000011702222,"about_ca_topic_score_gemma":0.0000071290297,"teacher_disagreement_score":0.4815216,"about_ca_system_score_codex":0.00012497288,"about_ca_system_score_gemma":0.00002073463,"threshold_uncertainty_score":0.43149838},"labels":[],"label_agreement":null},{"id":"W2082550304","doi":"10.1139/l08-145","title":"Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Hong Kong Polytechnic University","keywords":"Animation; Beijing; Stadium; Plan (archaeology); Computer science; Zoom; Interactive design; CAD; Schedule; Computer Aided Design; Computer animation; Floor plan; Computer graphics (images); Engineering drawing; Human–computer interaction; Engineering","score_opus":0.022719398722112073,"score_gpt":0.22153709465181148,"score_spread":0.19881769592969942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082550304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19863014,0.00036719098,0.80020356,0.00008063161,0.0004015214,0.0002852506,0.000021045566,0.000007003418,0.0000036295298],"genre_scores_gemma":[0.95854574,0.000006418794,0.041310642,0.000010129315,0.00010248246,0.0000051384222,0.0000048273578,0.000013129514,0.0000014663334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905306,0.000019984598,0.00058764254,0.00007256,0.00014114151,0.00012563079],"domain_scores_gemma":[0.9990015,0.0002490554,0.00016858615,0.00008508911,0.00043297582,0.00006277408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003622462,0.00011760883,0.00020281691,0.00024388713,0.00011059545,0.000025305657,0.000081337734,0.00007253905,0.0000051591755],"category_scores_gemma":[0.0001266294,0.000091012254,0.00010177576,0.0001631093,0.000042199896,0.00025603184,0.0000033906877,0.000108202505,2.2702391e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018581606,0.0000027143549,0.000030380492,0.00003904399,0.000041533833,1.0136834e-7,0.00016729328,0.9583119,0.033190235,0.0033356529,0.000026450874,0.0048361183],"study_design_scores_gemma":[0.00047860364,0.00009554958,0.0007326876,0.00029349502,0.00006179077,0.000040519506,0.00007254046,0.9916768,0.005816549,0.0006373027,0.000015386577,0.000078738194],"about_ca_topic_score_codex":0.00007557533,"about_ca_topic_score_gemma":0.0028747672,"teacher_disagreement_score":0.75991565,"about_ca_system_score_codex":0.00008824492,"about_ca_system_score_gemma":0.00020354698,"threshold_uncertainty_score":0.3711372},"labels":[],"label_agreement":null},{"id":"W2083365345","doi":"10.1007/s00158-004-0470-4","title":"Design optimization of simply supported concrete slabs by finite element modelling","year":2005,"lang":"en","type":"article","venue":"Structural and Multidisciplinary Optimization","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Finite element method; Parametric statistics; Chart; Reliability (semiconductor); Structural engineering; Displacement (psychology); Process (computing); Engineering design process; Computer science; Set (abstract data type); Engineering; Mechanical engineering; Mathematics","score_opus":0.012069522911936638,"score_gpt":0.22079184202485289,"score_spread":0.20872231911291625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083365345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050453898,0.00026611437,0.9483798,0.00009173624,0.00018377972,0.00027624858,0.000045715813,0.00014231753,0.00016039792],"genre_scores_gemma":[0.7171652,0.00042104907,0.28189257,0.000010568162,0.00005728469,0.000014682137,0.00035819577,0.000021789905,0.000058694277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999069,0.00003101511,0.00039586626,0.00019389416,0.00013601498,0.00017425012],"domain_scores_gemma":[0.9995818,0.00003522033,0.00009609864,0.00010815543,0.000112994865,0.000065742475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007430035,0.00018887482,0.00017195095,0.00009210336,0.00022503648,0.000026503223,0.00006172665,0.00010654522,0.00016546182],"category_scores_gemma":[0.000005520299,0.00017503601,0.00003330034,0.00015696012,0.000057962054,0.0004462046,0.000030500207,0.00009373112,9.920241e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034051387,0.0000012526242,0.00005337669,0.00003131685,0.000022509983,1.9532007e-7,0.0005438348,0.9937146,0.0024008295,0.00011560355,0.00008364401,0.002998825],"study_design_scores_gemma":[0.00052935135,0.00005702173,0.000013834277,0.000017471255,0.000043048087,0.000007395527,0.00014970332,0.9899686,0.00887901,0.000076125216,0.00005988248,0.00019853309],"about_ca_topic_score_codex":0.0000073167807,"about_ca_topic_score_gemma":0.0000013202342,"teacher_disagreement_score":0.6667113,"about_ca_system_score_codex":0.000042305386,"about_ca_system_score_gemma":0.000014830286,"threshold_uncertainty_score":0.7137761},"labels":[],"label_agreement":null},{"id":"W2090252087","doi":"10.1061/(asce)0733-9364(2005)131:9(993)","title":"Technical Knowledge Consolidation using Theory of Inventive Problem Solving","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Consolidation (business); Profitability index; Contradiction; Process (computing); Asset (computer security); Domain knowledge; Domain (mathematical analysis); Knowledge management; Management science; Engineering; Mathematics; Business","score_opus":0.0086191784857593,"score_gpt":0.2112510238382955,"score_spread":0.2026318453525362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090252087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14932135,0.0012456379,0.8436498,0.000027512466,0.0007422728,0.00013898524,0.0000016109734,0.00008485818,0.0047879457],"genre_scores_gemma":[0.9023679,0.00038067045,0.09709671,0.0000028597358,0.00011755771,0.000002008814,4.7814245e-7,0.000010916529,0.00002093526],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935085,0.000014199345,0.0003944133,0.000058001555,0.00009564734,0.00008687303],"domain_scores_gemma":[0.9996659,0.000021476408,0.00011992041,0.00005592498,0.00009631775,0.000040418898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023634142,0.00009258528,0.00014963392,0.00030522107,0.000027082913,0.000018729794,0.000046184556,0.000049524173,0.000016254044],"category_scores_gemma":[0.000008318778,0.000090136986,0.000052613905,0.00013816869,0.000047869526,0.00023509531,0.00001473563,0.00012738902,7.129079e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033352488,0.000041807634,0.00020250317,0.00059161236,0.00032944183,0.00000376621,0.00043126117,0.24328345,0.036831312,0.22472651,0.00026437955,0.4932606],"study_design_scores_gemma":[0.0053095636,0.0003755222,0.0056418874,0.0035042777,0.0013107494,0.0057137236,0.005611518,0.8004502,0.0888935,0.011084242,0.070637606,0.0014671902],"about_ca_topic_score_codex":2.7366684e-7,"about_ca_topic_score_gemma":6.1084586e-7,"teacher_disagreement_score":0.7530465,"about_ca_system_score_codex":0.00007254987,"about_ca_system_score_gemma":0.000010872667,"threshold_uncertainty_score":0.36756796},"labels":[],"label_agreement":null},{"id":"W2090853541","doi":"10.1111/0885-9507.00196","title":"A Multiobjective and Stochastic System for Building Maintenance Management","year":2000,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Maximization; Multi-objective optimization; Computer science; Stochastic programming; Minification; Prioritization; Stochastic optimization; Mathematical optimization; Reliability engineering; Preventive maintenance; Risk analysis (engineering); Decision support system; Operations research; Engineering; Management science; Business; Mathematics","score_opus":0.00219760042188058,"score_gpt":0.16235287211637445,"score_spread":0.16015527169449387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090853541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.122001566,0.00029605665,0.8759352,0.0000070371875,0.0005771463,0.00026886017,0.000011912911,0.00040968336,0.00049251225],"genre_scores_gemma":[0.96230775,0.000043511358,0.037266366,0.000014905271,0.00023905037,0.00006340452,0.0000044971493,0.000030723593,0.000029766095],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992621,0.0000049175856,0.00019614439,0.00023138575,0.000069207395,0.00023625237],"domain_scores_gemma":[0.9997299,0.00003542339,0.000019103096,0.000108120286,0.000027374428,0.00008012799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004722627,0.00021774427,0.00019358506,0.000111055175,0.00008411197,0.000078882564,0.00006613985,0.00007769175,0.000012238231],"category_scores_gemma":[0.0000027467268,0.00021111596,0.000036901172,0.00010713752,0.000023740036,0.0001537044,0.000020086332,0.00013133783,0.0000010895756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012227544,0.0000020402642,0.000015964159,0.0005036763,0.00008881515,0.0000027341534,0.00021668395,0.71856517,0.0007224658,0.012094352,0.00029620292,0.2674797],"study_design_scores_gemma":[0.0006297918,0.000034154844,0.0035349627,0.0002782124,0.000028526822,0.00013461731,0.000070951886,0.99160224,0.00017278749,0.00035485742,0.0029056026,0.00025327806],"about_ca_topic_score_codex":0.0000018510967,"about_ca_topic_score_gemma":0.0000012224665,"teacher_disagreement_score":0.8403062,"about_ca_system_score_codex":0.000071692695,"about_ca_system_score_gemma":0.0000032482778,"threshold_uncertainty_score":0.8609059},"labels":[],"label_agreement":null},{"id":"W2091603450","doi":"10.1061/41109(373)18","title":"An IDP-BIM Framework for Reshaping Professional Design Practices","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Knowledge management; Situated; Building information modeling; Process (computing); Fragmentation (computing); Knowledge transfer; Best practice; Human–computer interaction; Process management; Engineering; Artificial intelligence","score_opus":0.03922652413426811,"score_gpt":0.32844613500839115,"score_spread":0.28921961087412307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091603450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038768694,0.000026407286,0.9558661,0.00026842603,0.002258967,0.00018969907,0.000001943381,0.00032187745,0.0022979043],"genre_scores_gemma":[0.6007823,0.0000015592412,0.39851722,0.0001060736,0.00033546446,0.000071802584,0.000004376117,0.00001264648,0.00016856793],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996245,0.000012885256,0.000101582395,0.00009158805,0.000068275054,0.00010119489],"domain_scores_gemma":[0.9995851,0.0001594404,0.00004233574,0.000117157295,0.000053681,0.000042296197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001522765,0.00006374074,0.000050259343,0.00003526224,0.000086764994,0.000051783165,0.00007089367,0.00013614279,0.00042946328],"category_scores_gemma":[0.00013441492,0.00005258765,0.000019973146,0.00005420788,0.000017324477,0.00033806698,0.0000031586812,0.00025097493,0.000019559231],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003343893,0.000027506852,0.00031229568,0.000037477817,0.000021936667,3.3143962e-7,0.00023271251,0.0006127193,0.074832045,0.8597086,0.0050856257,0.05909533],"study_design_scores_gemma":[0.0004584903,0.00013946112,0.0016318165,0.00010293426,0.0000373109,0.000039145798,0.0018592278,0.53699845,0.14961217,0.24051352,0.06801888,0.0005885942],"about_ca_topic_score_codex":0.00000413056,"about_ca_topic_score_gemma":0.000025674994,"teacher_disagreement_score":0.61919504,"about_ca_system_score_codex":0.0000068826153,"about_ca_system_score_gemma":0.000025644626,"threshold_uncertainty_score":0.4702322},"labels":[],"label_agreement":null},{"id":"W2091875401","doi":"10.1139/l02-110","title":"Integrated three-dimensional computer-aided design and discrete-event simulation models","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"CAD; Computer Aided Design; Component (thermodynamics); Context (archaeology); Computer science; Key (lock); Engineering drawing; Software; Systems engineering; Engineering","score_opus":0.013076039179299764,"score_gpt":0.18504306794136605,"score_spread":0.1719670287620663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091875401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03393324,0.0007982162,0.9642692,0.000015958403,0.00072688155,0.00006524107,0.000003015113,0.000030330984,0.00015789089],"genre_scores_gemma":[0.9882526,0.0000062386675,0.01162986,0.000011529961,0.000068223286,0.0000015606669,0.0000017389705,0.000022232683,0.000006045701],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993597,0.00001766293,0.00027758974,0.000069761474,0.000096757365,0.0001785078],"domain_scores_gemma":[0.9994389,0.000054864853,0.000041194256,0.00006457877,0.00010844883,0.00029202932],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001701083,0.00013148067,0.00015224754,0.00026554413,0.00004691606,0.00005353224,0.000053380852,0.0000710655,0.00006162081],"category_scores_gemma":[0.000028135913,0.00012714184,0.000046154782,0.00014215612,0.000018050052,0.0002746177,0.0000017969905,0.00021053897,0.0000012489592],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018074907,0.0000010172013,0.00005663024,0.0000099189765,0.00003125059,0.000011515992,0.000060311773,0.99517024,0.00023257919,0.002174012,0.00014512945,0.0021055765],"study_design_scores_gemma":[0.00021039046,0.00003180924,0.0002193878,0.000097897486,0.000014585913,0.00015216268,0.000011233045,0.9965129,0.00021572816,0.0011321366,0.0012712157,0.00013055155],"about_ca_topic_score_codex":0.00007955396,"about_ca_topic_score_gemma":0.005186122,"teacher_disagreement_score":0.95431936,"about_ca_system_score_codex":0.0001332415,"about_ca_system_score_gemma":0.00015953933,"threshold_uncertainty_score":0.5184694},"labels":[],"label_agreement":null},{"id":"W2092364284","doi":"10.3992/jgb.7.3.16","title":"FROM YOUR CAR TO YOUR PATIO: USING RECYCLED TIRE PRODUCTS IN BUILDING PROJECTS","year":2012,"lang":"en","type":"article","venue":"Journal of Green Building","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Environmental science; Civil engineering; Automotive engineering; Waste management","score_opus":0.043221712524864724,"score_gpt":0.2797438039893068,"score_spread":0.23652209146444209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2092364284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98539376,0.0008114974,0.011694836,0.0001577886,0.0016775826,0.00011258808,0.0000039028723,0.000041890577,0.0001061383],"genre_scores_gemma":[0.96055824,0.000016597194,0.03742711,0.000031490472,0.0019032928,0.0000029628018,7.902406e-7,0.000034439898,0.000025066616],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998766,0.000043971097,0.00052822544,0.00011935327,0.00023183251,0.0003106053],"domain_scores_gemma":[0.9993776,0.000025802863,0.00017777672,0.00013284327,0.00014916234,0.00013678608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035416073,0.00016524059,0.0002627359,0.000433582,0.00006023939,0.000053093467,0.0001483496,0.00010014542,0.000017504597],"category_scores_gemma":[0.000098443816,0.00015607693,0.00006660976,0.00048299856,0.000011099803,0.0007751031,0.000026630365,0.0003146727,0.0000029699654],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000643151,0.000046717523,0.07021936,0.00006990927,0.00011550567,0.000019310706,0.005765131,0.007272799,0.70531565,0.00041929487,0.0004115617,0.21028046],"study_design_scores_gemma":[0.0064898417,0.0005802507,0.16863625,0.0068082805,0.0007584275,0.002527691,0.016853489,0.17219786,0.584707,0.004587798,0.031854674,0.0039983992],"about_ca_topic_score_codex":0.00040876927,"about_ca_topic_score_gemma":0.000023454262,"teacher_disagreement_score":0.20628206,"about_ca_system_score_codex":0.00031921238,"about_ca_system_score_gemma":0.00005257961,"threshold_uncertainty_score":0.6364633},"labels":[],"label_agreement":null},{"id":"W2094872154","doi":"10.1139/l99-057","title":"A preliminary study of the factors affecting the cost escalation of construction projects","year":2000,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Set (abstract data type); Fuzzy logic; Fuzzy set; Control (management); Operations research; Engineering; Risk analysis (engineering); Cost estimate; Cost contingency; Cost overrun; Computer science; Construction engineering; Systems engineering; Construction industry; Cost engineering; Business; Artificial intelligence","score_opus":0.008374325636464968,"score_gpt":0.17856033596485849,"score_spread":0.1701860103283935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094872154","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9971018,0.00015216734,0.0011021167,0.000013180569,0.00070411916,0.0002134521,0.0000034929924,0.000011420997,0.00069829315],"genre_scores_gemma":[0.99987197,0.0000045772535,0.000038784576,0.000001270542,0.000058967027,0.0000022690149,3.5367103e-7,0.0000129357095,0.000008850391],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99935967,0.00002598377,0.00032441507,0.000044105123,0.00013015996,0.000115657866],"domain_scores_gemma":[0.99957305,0.000054691656,0.000105620755,0.00011353123,0.000084919455,0.00006816152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001374182,0.00009107642,0.00013581161,0.00015257804,0.000063371226,0.000016444394,0.00012706629,0.00004659967,0.00008405558],"category_scores_gemma":[0.000050820367,0.000061108825,0.00006775369,0.00029428984,0.000036689442,0.00013427854,0.0000026192465,0.00022897312,2.6343528e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011774886,0.000014604317,0.06970836,0.00008012417,0.00013224845,0.0000027717424,0.0082288785,0.9006626,0.0015368018,0.00012896198,0.000113838294,0.01937902],"study_design_scores_gemma":[0.0012103658,0.0005534873,0.88296646,0.00079198345,0.00024126066,0.0005561119,0.018437093,0.07890291,0.014622087,0.000069574155,0.0012779477,0.00037071726],"about_ca_topic_score_codex":0.00048313005,"about_ca_topic_score_gemma":0.015430584,"teacher_disagreement_score":0.8217597,"about_ca_system_score_codex":0.00008432462,"about_ca_system_score_gemma":0.00010888843,"threshold_uncertainty_score":0.86106277},"labels":[],"label_agreement":null},{"id":"W2095258717","doi":"10.5555/1218112.1218546","title":"Conspace simulation application","year":2006,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Space (punctuation); Systems engineering; Space technology; Industrial engineering; Distributed computing; Engineering; Aerospace engineering; Operating system","score_opus":0.012256144250304418,"score_gpt":0.23663059618888466,"score_spread":0.22437445193858024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095258717","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051258653,0.00003557351,0.92696947,0.00006777393,0.0003095442,0.0001813423,0.0000066488974,0.0005036288,0.020667357],"genre_scores_gemma":[0.9986542,0.0000015376125,0.00060747506,0.000031630367,0.00017515742,0.000024736499,0.0000622508,0.00001630454,0.00042670342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993248,0.000017098837,0.00024552186,0.0001605349,0.00012791797,0.0001241071],"domain_scores_gemma":[0.9995067,0.00006952759,0.00004707325,0.00017428811,0.0001723456,0.00003005166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000461066,0.00012614063,0.00009655574,0.00008788437,0.000057389818,0.000073193005,0.0000720004,0.00008958361,0.0002455966],"category_scores_gemma":[0.000009599477,0.00013382014,0.000038323233,0.00014165077,0.00003606974,0.00027317717,0.000007591823,0.00009261877,0.00018391857],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051643196,0.000006900548,0.0013937508,0.000008602158,0.0000052300106,1.522361e-7,0.000051230425,0.96054864,0.0020475388,0.013262525,0.0001612991,0.022508979],"study_design_scores_gemma":[0.0001896233,0.0000076467095,0.004760217,0.000012193588,0.000007693532,0.0000010786454,0.000024890696,0.972596,0.0013089217,0.0031649699,0.017781701,0.0001451021],"about_ca_topic_score_codex":0.000020020425,"about_ca_topic_score_gemma":0.000055294353,"teacher_disagreement_score":0.94739556,"about_ca_system_score_codex":0.000053387612,"about_ca_system_score_gemma":0.000012525432,"threshold_uncertainty_score":0.5457027},"labels":[],"label_agreement":null},{"id":"W2096080276","doi":"10.14359/20198","title":"Design of Green Engineered Cementitious Composites for Improved Sustainability","year":2008,"lang":"en","type":"article","venue":"ACI Materials Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":122,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Composite material; Materials science; Sustainability; Cementitious; Cement","score_opus":0.013077516015558602,"score_gpt":0.21111284346785877,"score_spread":0.19803532745230018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096080276","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5912148,0.000078831385,0.40766537,0.00005324165,0.00066205347,0.00022287731,0.000027446738,0.000053643238,0.000021740767],"genre_scores_gemma":[0.9919257,0.000052694493,0.007757773,0.00000831999,0.0001664799,0.000019042202,0.000008965818,0.000013238226,0.00004779714],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994252,0.000027014166,0.00030591074,0.000054120264,0.000056288587,0.00013149391],"domain_scores_gemma":[0.99957246,0.000027542024,0.000063574385,0.000074611096,0.00022631726,0.0000354715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016637325,0.000084175575,0.0001555598,0.000062893254,0.00008204367,0.000027343267,0.00007073896,0.000050475734,0.0001317813],"category_scores_gemma":[0.000021918211,0.00007659548,0.000038750437,0.000042265467,0.000031969455,0.00014158714,0.000005612329,0.000046905283,0.0000014043342],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005463314,0.000011334015,0.00002936537,0.00007119488,0.000044970973,0.0000012932607,0.00014378587,0.0023280028,0.99560004,0.00022938146,0.00049326755,0.0009927152],"study_design_scores_gemma":[0.0007190611,0.00013366337,0.00044799762,0.000014201537,0.00002734122,0.00031809288,0.00008108777,0.005561238,0.9883749,0.003747305,0.0004443664,0.0001307297],"about_ca_topic_score_codex":0.000009664401,"about_ca_topic_score_gemma":6.536328e-7,"teacher_disagreement_score":0.4007109,"about_ca_system_score_codex":0.000059435515,"about_ca_system_score_gemma":0.000033961926,"threshold_uncertainty_score":0.31234732},"labels":[],"label_agreement":null},{"id":"W2096483370","doi":"10.5555/1516744.1517168","title":"Optimization of multi-project environment (OPMPE)","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Project planning; Project management; Work (physics); Project management triangle; Scheduling (production processes); Operations research; Process management; Systems engineering; Engineering; Operations management","score_opus":0.041310247869666056,"score_gpt":0.24016777781376553,"score_spread":0.19885752994409947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096483370","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043601587,0.00003412758,0.9536571,0.000009808167,0.00019270531,0.00011108912,0.000006310554,0.00010153367,0.002285764],"genre_scores_gemma":[0.9891685,0.000046752426,0.010500889,0.000009423578,0.000026138336,0.000008348685,0.000018447963,0.000009703605,0.00021177997],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995052,0.000014974792,0.00021031464,0.00009876827,0.0000976511,0.00007306515],"domain_scores_gemma":[0.9997453,0.000018878327,0.00003974701,0.00012006592,0.00005662137,0.00001938553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025540869,0.00008494576,0.00009053434,0.00007714422,0.00003233867,0.000008169087,0.000056315836,0.000054261454,0.00046182508],"category_scores_gemma":[0.000008106436,0.000085341366,0.000033756383,0.00006290959,0.00004716962,0.00015608557,0.000008857976,0.000058009064,0.000025161235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050470194,0.000011022267,0.0010948107,0.000008426526,0.000009910958,3.2658647e-7,0.00043750965,0.99253863,0.0007902479,0.00023859333,0.000039238115,0.004826248],"study_design_scores_gemma":[0.000235963,0.000016053265,0.0019063944,0.000013835999,0.000005098299,0.0000034405828,0.000052130512,0.9943112,0.002406104,0.000016176653,0.0009478134,0.00008579724],"about_ca_topic_score_codex":0.0000068705463,"about_ca_topic_score_gemma":0.0000024425485,"teacher_disagreement_score":0.94556695,"about_ca_system_score_codex":0.000028003578,"about_ca_system_score_gemma":0.000014738295,"threshold_uncertainty_score":0.5056661},"labels":[],"label_agreement":null},{"id":"W2096696486","doi":"10.1139/cjce-2014-0199","title":"Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Unavailability; Software deployment; Production (economics); Revenue; Capacity management; Computer science; Capacity planning; Productivity; Capacity utilization; Service (business); Stability (learning theory); Work (physics); Operations research; Operations management; Reliability engineering; Engineering; Business; Economics; Computer network","score_opus":0.010122234727204233,"score_gpt":0.18349908955392938,"score_spread":0.17337685482672516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096696486","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31324703,0.00022317385,0.68411845,0.000059657094,0.002069314,0.000180119,0.0000051063153,0.00002935097,0.00006778773],"genre_scores_gemma":[0.93798673,0.000009759292,0.06174392,0.0000039917686,0.00021279814,0.000015173301,0.000001168847,0.000025393303,0.0000010762501],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902064,0.00002185477,0.0005058838,0.00010416796,0.000107264736,0.00024021527],"domain_scores_gemma":[0.99931747,0.000082801795,0.00012220396,0.0001285903,0.00016612092,0.00018284096],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044639962,0.00013757474,0.00028907091,0.0004131683,0.000033431857,0.000027764252,0.00008980964,0.00012139969,0.000038809692],"category_scores_gemma":[0.0005525871,0.00014910464,0.00009624881,0.00023990196,0.00004558787,0.00021274497,0.000002382614,0.00029557443,2.4495188e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004459674,0.000009017026,0.0022980468,0.00050343736,0.00008090323,0.0000016294555,0.00069007324,0.9398214,0.011649666,0.0061647766,0.000048628383,0.038687788],"study_design_scores_gemma":[0.0029999807,0.00027883283,0.0029557717,0.001671992,0.00016004201,0.0002902167,0.0007566835,0.92108184,0.05861564,0.008765496,0.001630218,0.00079330103],"about_ca_topic_score_codex":0.00026971553,"about_ca_topic_score_gemma":0.0146318395,"teacher_disagreement_score":0.6247397,"about_ca_system_score_codex":0.00043391073,"about_ca_system_score_gemma":0.00019227277,"threshold_uncertainty_score":0.81649095},"labels":[],"label_agreement":null},{"id":"W2096817884","doi":"10.5555/1516744.1517175","title":"An integrated CAD and simulation model for concrete operations","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Visual Basic for Applications; Downtown; Slab; CAD; Computer science; Software; Engineering drawing; Civil engineering; Software engineering; Engineering; Structural engineering; Operating system","score_opus":0.04144232926489277,"score_gpt":0.2749843824160165,"score_spread":0.23354205315112375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096817884","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26627317,0.000018286577,0.7328561,0.000024821335,0.00013560857,0.00020431176,0.000036557438,0.00020427251,0.00024691358],"genre_scores_gemma":[0.9924929,0.000008663788,0.006952044,0.00006350044,0.000062225496,0.00004079408,0.00012986583,0.000019304269,0.00023066692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993487,0.000019267001,0.0002443155,0.000184409,0.00008324005,0.00012006029],"domain_scores_gemma":[0.9993748,0.000060218244,0.00002198847,0.00014532817,0.00032892835,0.00006870138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000049565053,0.00013927,0.0001242224,0.00008783272,0.00015648242,0.00007343877,0.00006402604,0.00010063546,0.00006412336],"category_scores_gemma":[0.000029590534,0.00013868546,0.000030400506,0.00007816636,0.000061070794,0.0005793081,0.0000056853,0.000093777206,0.0000067346105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015995629,0.0000022830077,0.00018712228,0.0000073867745,0.000010042105,1.5568098e-7,0.00097634684,0.9881277,0.0017699274,0.0026034631,0.000027133874,0.0062724394],"study_design_scores_gemma":[0.0003700431,0.00003766664,0.00041699767,0.000012800666,0.000010936232,0.00000358178,0.00008461615,0.9976082,0.00028191737,0.00037598383,0.00063382526,0.00016346438],"about_ca_topic_score_codex":0.000010354643,"about_ca_topic_score_gemma":0.000049916798,"teacher_disagreement_score":0.7262198,"about_ca_system_score_codex":0.000033699598,"about_ca_system_score_gemma":0.000040800624,"threshold_uncertainty_score":0.5655429},"labels":[],"label_agreement":null},{"id":"W2096833878","doi":"10.1139/l2012-077","title":"Post simulation visualization model for effective scheduling of modular building construction<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Schedule; Scheduling (production processes); Computer science; Construction management; Factory (object-oriented programming); ASCII; Animation; Engineering; Industrial engineering; Civil engineering; Computer graphics (images); Operating system; Mechanical engineering; Operations management","score_opus":0.0050525624977264,"score_gpt":0.19928570742520027,"score_spread":0.19423314492747387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096833878","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63303113,0.00037710604,0.36424053,0.000019650086,0.00095211173,0.0005138628,0.00004404884,0.00003214331,0.0007894321],"genre_scores_gemma":[0.98482114,0.000062059764,0.014589083,0.0000067292244,0.00046454745,0.000009756161,0.000004350134,0.0000360989,0.0000062176755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884653,0.000015948683,0.00061485724,0.000110525594,0.00017873911,0.0002333718],"domain_scores_gemma":[0.99925673,0.00008266056,0.00020131971,0.000076635166,0.00024187048,0.00014075666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002646656,0.00018228035,0.00033859853,0.0010363515,0.000039023373,0.000015505973,0.000058231693,0.00014992697,0.00027418075],"category_scores_gemma":[0.000108674,0.00022010999,0.00009150304,0.0003777876,0.000042516378,0.0004525131,0.000004880579,0.00018558258,2.2271026e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030658015,0.000009279133,0.001059146,0.0005020919,0.00013296201,3.7861494e-7,0.0010253909,0.9623266,0.02177491,0.0051787794,0.000009955501,0.007949869],"study_design_scores_gemma":[0.0006147266,0.00007580932,0.0009314181,0.0006140785,0.00008572145,0.000030514886,0.00021424363,0.9809843,0.015776267,0.00005940859,0.00044369663,0.00016982757],"about_ca_topic_score_codex":0.00007408167,"about_ca_topic_score_gemma":0.00026582353,"teacher_disagreement_score":0.35179004,"about_ca_system_score_codex":0.00024589163,"about_ca_system_score_gemma":0.000053454358,"threshold_uncertainty_score":0.8975825},"labels":[],"label_agreement":null},{"id":"W2096858734","doi":"","title":"Whole life building management: occupancy to dismantling","year":2000,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Standardization; Demolition; Scope (computer science); Building information modeling; Process (computing); Work (physics); Asset (computer security); Session (web analytics); Engineering management; Computer science; Engineering; Process management; Knowledge management; Operations management; Civil engineering; World Wide Web","score_opus":0.006414178199136263,"score_gpt":0.20621491390085173,"score_spread":0.19980073570171547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096858734","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5876675,0.000074679505,0.03100163,0.00026916357,0.00046054105,0.00012521511,0.0000052319256,0.0004883284,0.37990767],"genre_scores_gemma":[0.9884056,0.000029678498,0.009796086,0.00013368859,0.0001240908,0.000020345862,0.000002447162,0.000014193698,0.001473889],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99959093,0.0000040707487,0.00010356469,0.00009401218,0.00007597038,0.00013143929],"domain_scores_gemma":[0.9998077,0.0000042833663,0.000004780808,0.00010930393,0.0000075768016,0.00006631417],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000028380857,0.000068877824,0.00005874412,0.00005652226,0.000048917333,0.00003608529,0.00006784313,0.000027331724,0.0014879176],"category_scores_gemma":[0.0000021617245,0.00007117573,0.000024548832,0.00013837212,0.000006232665,0.00008505079,0.000006806925,0.000060560767,0.0005390762],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000923306,0.00000796484,0.00038153186,0.00004475965,0.00003706908,0.000004419363,0.0002151722,0.009600434,0.018488955,0.026247492,0.012978752,0.93198425],"study_design_scores_gemma":[0.0005324913,0.000028891072,0.0063954196,0.0001554998,0.000034194974,0.000013318896,0.00031573352,0.055837948,0.007739176,0.011022578,0.91736054,0.000564194],"about_ca_topic_score_codex":0.000001195075,"about_ca_topic_score_gemma":0.0000014521063,"teacher_disagreement_score":0.93142,"about_ca_system_score_codex":0.000019402984,"about_ca_system_score_gemma":0.0000021133603,"threshold_uncertainty_score":0.9994249},"labels":[],"label_agreement":null},{"id":"W2096916326","doi":"10.14288/1.0076445","title":"Améliorer les processus de communication sur les chantiers de construction à l'aide des technologies mobiles et des technologies infonuagiques","year":2015,"lang":"fr","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.01792366991227897,"score_gpt":0.1925150873681029,"score_spread":0.17459141745582393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096916326","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9485467,0.021745358,0.026040189,0.0005946989,0.00017671568,0.0002558604,0.000106144405,0.001526622,0.001007688],"genre_scores_gemma":[0.9285883,0.020724377,0.05032579,0.0000038332905,0.000012578105,0.0000070378214,0.000021973734,0.000026067439,0.00029007875],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9987805,0.00013357436,0.00022551653,0.00027944942,0.0001839917,0.00039696894],"domain_scores_gemma":[0.9985444,0.00007798591,0.00018750175,0.00034041065,0.00077330705,0.000076406286],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.00039169984,0.000121831574,0.0003127833,0.00019449208,0.00046190806,0.00022980293,0.00050483656,0.00069012586,0.000021535983],"category_scores_gemma":[0.0003920149,0.0003550345,0.000105856496,0.00059147907,0.003875519,0.0011833085,0.00018694885,0.00050993066,0.000005520625],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012497942,0.000056086967,0.072127886,0.00048421283,0.00008950951,0.000018152334,0.0023557178,0.0005269479,0.0007142333,0.00040846746,0.0012152265,0.92199105],"study_design_scores_gemma":[0.0013283703,0.00023910322,0.36715612,0.003074343,0.00022820575,0.0011322002,0.54621595,0.0049237227,0.0012339201,0.06917164,0.0045130765,0.00078337797],"about_ca_topic_score_codex":0.13557494,"about_ca_topic_score_gemma":0.36064413,"teacher_disagreement_score":0.92120767,"about_ca_system_score_codex":0.0005857107,"about_ca_system_score_gemma":0.0002666481,"threshold_uncertainty_score":0.99989015},"labels":[],"label_agreement":null},{"id":"W2097590915","doi":"10.1139/l2012-059","title":"Estimating productivity of earthmoving operations using spatial technologies<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Global Positioning System; Excavator; Process (computing); Software; Computer science; Automation; Industrial engineering; Data mining; Engineering; Simulation; Civil engineering","score_opus":0.006218157431427157,"score_gpt":0.17896066064854804,"score_spread":0.1727425032171209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097590915","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9681559,0.00046278938,0.027317034,0.00006067913,0.0013674174,0.00028261702,0.00001856772,0.000057890597,0.002277076],"genre_scores_gemma":[0.9797847,0.00003610931,0.01961061,0.0000022980907,0.00053183775,0.0000032067096,9.1576044e-7,0.000023568506,0.0000067339856],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989557,0.000013307055,0.0005328836,0.000098780554,0.00016389404,0.00023541402],"domain_scores_gemma":[0.999561,0.000027347274,0.00011702345,0.00010241459,0.000099025696,0.00009320305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002429018,0.00015701054,0.00030179098,0.0008712686,0.00004046215,0.000016488904,0.00007321316,0.00011848097,0.000556937],"category_scores_gemma":[0.0001251684,0.00018145873,0.00005524377,0.00043113792,0.000053928547,0.0003946617,0.000009163192,0.00029879774,3.6104132e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007225212,0.000012245779,0.00365654,0.00037099107,0.00009777554,0.00000199546,0.0009526399,0.94012296,0.029423142,0.0006805453,0.00003213199,0.024641782],"study_design_scores_gemma":[0.0005357287,0.00009906235,0.004310009,0.0013910474,0.000101026984,0.00021572762,0.000626113,0.93648297,0.05427073,0.000020778261,0.0016287139,0.00031811232],"about_ca_topic_score_codex":0.0005686951,"about_ca_topic_score_gemma":0.0025289245,"teacher_disagreement_score":0.024847588,"about_ca_system_score_codex":0.00018231092,"about_ca_system_score_gemma":0.00006918542,"threshold_uncertainty_score":0.7399672},"labels":[],"label_agreement":null},{"id":"W2097666093","doi":"","title":"A Survey on the Impact of Information Technology in the Canadian Architecture, Engineering and Construction Industry","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":138,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Work (physics); Architecture; Investment (military); The Internet; Quality (philosophy); Information technology; Engineering; Business; Enterprise architecture; Engineering management; Marketing; Operations management; Industrial organization; Computer science; Economics","score_opus":0.005663437810450658,"score_gpt":0.18790680709214122,"score_spread":0.18224336928169055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097666093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9935815,0.0000124146345,0.00016165756,0.00020752614,0.000031409138,0.00009217239,0.000012941972,0.000031798863,0.0058685993],"genre_scores_gemma":[0.9998661,0.0000060556567,0.00008011823,0.000021380398,0.0000067369283,0.000007607347,0.0000056672934,0.000002415133,0.000003885618],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997258,0.00001499058,0.00010547158,0.000028233306,0.00004355405,0.00008195979],"domain_scores_gemma":[0.99984,0.000038207672,0.000009710884,0.00008103428,0.000014157525,0.000016859445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012520963,0.00005650714,0.00004727123,0.00021586254,0.000030835996,0.000023598825,0.000054212047,0.00013373753,0.000121807796],"category_scores_gemma":[0.000024462524,0.000031265903,0.00001178612,0.00032813186,0.00003977831,0.00006815621,0.0000013818452,0.00031822102,0.000003490378],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016478782,0.0000063003386,0.075535975,0.000014242502,0.000052944393,6.3452984e-7,0.0011043302,0.24648155,0.00020314519,0.05886312,0.0007648479,0.6169564],"study_design_scores_gemma":[0.00021214901,0.00006823191,0.92848563,0.00003319591,0.0000039900156,0.00010249286,0.0005134113,0.066005886,0.0009918713,0.0025032803,0.00092340226,0.00015647078],"about_ca_topic_score_codex":0.043235492,"about_ca_topic_score_gemma":0.055446457,"teacher_disagreement_score":0.8529496,"about_ca_system_score_codex":0.000048616253,"about_ca_system_score_gemma":0.00003045397,"threshold_uncertainty_score":0.96313566},"labels":[],"label_agreement":null},{"id":"W2097911660","doi":"10.5555/2693848.2694271","title":"Material and facility layout planning in construction projects using simulation","year":2014,"lang":"en","type":"article","venue":"Northumbria Research Link (Northumbria University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Haulage; Material handling; Yard; Computer science; Process (computing); Genetic algorithm; Position (finance); Page layout; Domain (mathematical analysis); Industrial engineering; Engineering; Algorithm","score_opus":0.05344946049712605,"score_gpt":0.2797444416843364,"score_spread":0.2262949811872103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097911660","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9867913,0.000020461008,0.0073953373,0.000021801416,0.00038313578,0.0003459484,0.000031544972,0.00019219817,0.0048182677],"genre_scores_gemma":[0.9989986,0.000014231517,0.00061896665,0.0000040412237,0.00020140043,0.000001976436,0.000038230806,0.000017632272,0.000104950355],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983232,0.00032747356,0.00025552147,0.00035690214,0.00032036213,0.0004165116],"domain_scores_gemma":[0.9992454,0.00014846704,0.000047877107,0.00023741373,0.00019945473,0.00012136604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006233842,0.00018136039,0.00022318169,0.0008251524,0.0002852698,0.00011630652,0.0001493444,0.00021181548,0.000052687483],"category_scores_gemma":[0.00009003586,0.00021155439,0.00004340696,0.0007172452,0.00025692006,0.0004911763,0.0000717404,0.00047508735,0.000011549438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006195803,0.000052899566,0.60627747,0.00033605422,0.000106834945,0.000059983962,0.0021323035,0.253225,0.007787107,0.016267018,0.0000330608,0.11310272],"study_design_scores_gemma":[0.002176846,0.00013493186,0.070117585,0.0001891682,0.0000349247,0.000045046505,0.0019881309,0.9055643,0.0010141536,0.0013971002,0.016676039,0.00066174514],"about_ca_topic_score_codex":0.0004024915,"about_ca_topic_score_gemma":0.0006817745,"teacher_disagreement_score":0.65233934,"about_ca_system_score_codex":0.00021949722,"about_ca_system_score_gemma":0.00009287079,"threshold_uncertainty_score":0.8626938},"labels":[],"label_agreement":null},{"id":"W2098559241","doi":"10.5555/2693848.2694254","title":"Lifecycle evaluation of building sustainability using BIM and RTLS","year":2014,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Real-time locating system; Building information modeling; Sustainability; Interoperability; Systems engineering; Computer science; Information model; Engineering; Process management; Software engineering; Operations management; Real-time computing; World Wide Web","score_opus":0.03651234318839945,"score_gpt":0.30665295611210847,"score_spread":0.270140612923709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098559241","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55985963,0.00001806004,0.43945253,0.000014703809,0.00011461994,0.00008336435,8.7891937e-7,0.00003576928,0.0004204485],"genre_scores_gemma":[0.99884164,0.0000010550665,0.0010888983,0.000006713172,0.00004358732,0.0000043625573,0.0000021299124,0.0000065715335,0.0000050670733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993892,0.00006733004,0.00019849752,0.000110759174,0.00015788182,0.00007637029],"domain_scores_gemma":[0.99921525,0.00006491261,0.000044614477,0.00011782367,0.00052979967,0.000027576665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003584988,0.00007374705,0.00009509922,0.000074982716,0.000032785927,0.00003085793,0.000038094786,0.000051116334,0.00008088998],"category_scores_gemma":[0.00016423644,0.00007547961,0.000020703317,0.00008083592,0.00004162757,0.000205076,0.000011848784,0.000054718163,8.1672675e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000060412863,0.0000054863817,0.0064134374,0.000052992673,0.000011091602,1.9045908e-8,0.00027326966,0.8301482,0.004626538,0.01104914,0.0000024839608,0.1474113],"study_design_scores_gemma":[0.00022297977,0.000012139196,0.0075363917,0.00003026629,0.000023032657,8.701948e-7,0.00010491091,0.97787803,0.0028888804,0.011118315,0.00011143787,0.00007274172],"about_ca_topic_score_codex":0.000014112191,"about_ca_topic_score_gemma":0.000008015854,"teacher_disagreement_score":0.43898198,"about_ca_system_score_codex":0.000070600334,"about_ca_system_score_gemma":0.0000303947,"threshold_uncertainty_score":0.30779693},"labels":[],"label_agreement":null},{"id":"W2099066387","doi":"10.14796/jwmm.r215-03","title":"Continuous Modeling for Design, Construction and Monitoring: A Case Study","year":2003,"lang":"en","type":"article","venue":"Journal of Water Management Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Philips (Canada)","funders":"","keywords":"Computer science; Engineering; Systems engineering","score_opus":0.03337072385201464,"score_gpt":0.23811971025151843,"score_spread":0.20474898639950379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099066387","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46477017,0.00009644445,0.5344159,0.0000053245208,0.0004490732,0.00017249292,1.5542363e-7,0.000019551166,0.0000709077],"genre_scores_gemma":[0.9234603,0.00005184745,0.07634029,0.0000028068084,0.00009451955,0.000015687963,1.7743875e-7,0.000017263274,0.000017080885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991944,0.000030467025,0.00041636013,0.000094301984,0.00011789137,0.00014660094],"domain_scores_gemma":[0.99968916,0.00000941561,0.000043288626,0.000071971546,0.00013962689,0.000046506586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000453145,0.00011522759,0.00016197917,0.00019077487,0.00010052779,0.000090179536,0.000040649596,0.000035216217,0.0000029135467],"category_scores_gemma":[0.000005029465,0.00008979252,0.000048549842,0.000042046002,0.0000074879395,0.00026316446,0.000008452759,0.00010631191,4.5489344e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021837519,0.000020810627,0.00016844341,0.000042824402,0.0001592984,0.0001166775,0.00089256535,0.98513496,0.00052091555,0.0002575305,0.000006214732,0.0126579],"study_design_scores_gemma":[0.0009797876,0.00010105563,3.2890586e-7,0.000039227005,0.00015586922,0.0019586447,0.018076818,0.97501117,0.0013218719,0.0021773158,0.000060542057,0.00011738627],"about_ca_topic_score_codex":0.0000037845887,"about_ca_topic_score_gemma":7.552297e-7,"teacher_disagreement_score":0.45869017,"about_ca_system_score_codex":0.000042834312,"about_ca_system_score_gemma":0.000004063837,"threshold_uncertainty_score":0.36616328},"labels":[],"label_agreement":null},{"id":"W2099845834","doi":"10.1109/aim.2008.4601654","title":"Development of an operation skill-training simulator for double-front work machine","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Department of Family and Community Medicine, University of Toronto; Waseda University","keywords":"Operability; Simulation; Computer science; Joystick; Driving simulator; Task (project management); Computer architecture simulator; Training (meteorology); Work (physics); Set (abstract data type); Engineering; Software engineering; Systems engineering","score_opus":0.029633581080054892,"score_gpt":0.24012766848156875,"score_spread":0.21049408740151385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099845834","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6913669,0.000031160278,0.304623,0.000009132791,0.00024387604,0.0001641861,0.0000019451838,0.00014867588,0.0034111207],"genre_scores_gemma":[0.86490893,0.000002102109,0.13470654,0.000011300429,0.000044111075,0.00002756989,0.000030167685,0.000010217889,0.00025904892],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995776,0.00000263707,0.00019796152,0.00007368194,0.00006600122,0.00008214614],"domain_scores_gemma":[0.9998347,0.000008211831,0.00001539241,0.00006937295,0.00003954795,0.000032782813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000049988157,0.000069447895,0.00008344872,0.000040912553,0.00007391696,0.000008248808,0.000037603877,0.000043073956,0.00013422049],"category_scores_gemma":[0.0000023913954,0.00006131539,0.000021101148,0.000042561787,0.000010892067,0.00012983938,0.0000032226021,0.000034873672,0.0000069123835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020195644,0.0000867748,0.0016587606,0.00008878067,0.0001513826,0.000001153411,0.027664999,0.38482088,0.021163324,0.02221842,0.00072020333,0.54122335],"study_design_scores_gemma":[0.0030308876,0.000081764956,0.0047073816,0.00004971723,0.000019371728,0.000025196952,0.0015568648,0.7343785,0.22981192,0.00020493398,0.025582638,0.00055078184],"about_ca_topic_score_codex":0.0000042683864,"about_ca_topic_score_gemma":0.00007536957,"teacher_disagreement_score":0.5406726,"about_ca_system_score_codex":0.000028743381,"about_ca_system_score_gemma":0.000030205658,"threshold_uncertainty_score":0.2500369},"labels":[],"label_agreement":null},{"id":"W2100176012","doi":"10.1061/(asce)0887-3801(2008)22:3(192)","title":"Linear Scheduling and 4D Visualization","year":2008,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"CAD; Computer science; Schedule; Scheduling (production processes); Software; Visualization; Computer Aided Design; Software engineering; Engineering drawing; Industrial engineering; Systems engineering; Data mining; Engineering; Programming language","score_opus":0.009215984172002756,"score_gpt":0.21678498056297366,"score_spread":0.2075689963909709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100176012","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6135372,0.00042337365,0.38552943,0.0000059507033,0.00034096185,0.000015069873,9.3850915e-8,0.000042978267,0.00010495381],"genre_scores_gemma":[0.9858787,0.00011940317,0.013758334,0.0000059572835,0.00021943539,2.1087135e-7,3.1961713e-7,0.000015707974,0.0000019361553],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993929,0.000007372516,0.00033844955,0.000047618054,0.0001083657,0.0001052538],"domain_scores_gemma":[0.99976224,0.000046297257,0.00005631749,0.000038158454,0.000056147157,0.000040861134],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016237257,0.00008260747,0.00014160702,0.00024211612,0.000035026067,0.000017912886,0.000046530953,0.000051022944,0.0000042611364],"category_scores_gemma":[0.000048167443,0.00008537995,0.000030148396,0.00019234193,0.000013534647,0.00014991888,0.000008835187,0.00021609916,5.756464e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016252932,0.000004187187,0.003921035,0.000034811274,0.000010921434,0.000011613049,0.00035017796,0.99097306,0.002543517,0.00076473685,0.000011034395,0.0013732591],"study_design_scores_gemma":[0.00024446912,0.000017909215,0.0076854373,0.00017627818,0.0000038679764,0.0004990703,0.000035554134,0.98962367,0.0013172332,0.000023066817,0.00028719564,0.00008626382],"about_ca_topic_score_codex":0.0000012369228,"about_ca_topic_score_gemma":0.0000022048325,"teacher_disagreement_score":0.3723415,"about_ca_system_score_codex":0.000043013228,"about_ca_system_score_gemma":0.000016472331,"threshold_uncertainty_score":0.34816936},"labels":[],"label_agreement":null},{"id":"W2100463969","doi":"","title":"Information technology as boundary object for transformational learning","year":2009,"lang":"en","type":"article","venue":"University of Huddersfield Repository (University of Huddersfield)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"","keywords":"Knowledge management; Transformational leadership; Boundary object; Fragmentation (computing); Computer science; Collaborative learning; Knowledge sharing; Boundary (topology); Psychology; Sociology","score_opus":0.0025488375527246113,"score_gpt":0.14620605112761062,"score_spread":0.143657213574886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100463969","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041054588,0.00032399085,0.23895891,0.001417627,0.00051017344,0.00042167035,0.000014872063,0.00043573946,0.71686244],"genre_scores_gemma":[0.99638766,0.00011088296,0.0028724915,0.000022462615,0.00001958228,6.9152144e-8,0.00001965915,0.0000040051445,0.00056318135],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.9994014,0.00001909367,0.00016064716,0.00010208549,0.00015865202,0.00015811686],"domain_scores_gemma":[0.9994457,0.000045292058,0.00012150829,0.00014001978,0.00019643187,0.000051053168],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006357425,0.00012214255,0.00020356072,0.0003284056,0.00038011328,0.000013746199,0.00023210033,0.00029638375,0.0023730805],"category_scores_gemma":[0.000011766354,0.00017268721,0.0001686237,0.0002124332,0.00016569278,0.00080880284,0.000014367484,0.0002498105,0.000007975731],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001351178,0.00022663319,0.0012616932,0.0008051605,0.0008593362,0.00004609786,0.045278832,0.020663766,0.03306273,0.058610003,0.6352567,0.20257784],"study_design_scores_gemma":[0.0016836368,0.00057520036,0.00009539444,0.00008757648,0.00013367702,0.000059760983,0.9673648,0.0075904243,0.009226725,0.0021813367,0.010667785,0.00033370845],"about_ca_topic_score_codex":0.00007569946,"about_ca_topic_score_gemma":0.000027466942,"teacher_disagreement_score":0.95533305,"about_ca_system_score_codex":0.0000024504375,"about_ca_system_score_gemma":0.000086026375,"threshold_uncertainty_score":0.9985389},"labels":[],"label_agreement":null},{"id":"W2101131792","doi":"10.5555/2429759.2430111","title":"Construction operations simulation under structural adequacy constraints: the Stonecutters Bridge case study","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bridge (graph theory); Perspective (graphical); Resource (disambiguation); Sequence (biology); Resource allocation; Computer science; Engineering; Bridge maintenance; Construction management; Construction engineering; Civil engineering; Structural engineering","score_opus":0.04768751709199122,"score_gpt":0.3056269249822584,"score_spread":0.2579394078902672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101131792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64151484,0.000028619917,0.35597023,0.000086008156,0.0012571857,0.00045416516,0.000017394881,0.00022590627,0.00044562857],"genre_scores_gemma":[0.99902767,0.0000014983364,0.00039649016,0.00011821714,0.00031651751,0.00004196141,0.000031589163,0.000027257865,0.000038785973],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860513,0.00014389584,0.0004877879,0.00022318456,0.00024131298,0.00029867265],"domain_scores_gemma":[0.9990366,0.00018620036,0.00006737443,0.00033297637,0.00026690937,0.00010992775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018164548,0.0002629988,0.0001799805,0.00013195143,0.00037941826,0.00023481587,0.00012950988,0.000107585,0.0007828848],"category_scores_gemma":[0.00003853071,0.000214049,0.000073163596,0.00023359818,0.00023353205,0.0011061832,0.000027544213,0.0002978286,0.00006219517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000970262,0.000024582834,0.007936542,0.000006950973,0.00007550559,0.0000054418815,0.004820536,0.9519596,0.00016255504,0.0043197772,0.000023596665,0.030655194],"study_design_scores_gemma":[0.0005918335,0.00003899029,0.017166872,0.000016494623,0.00007004882,0.0004691287,0.011483591,0.96936774,0.000107584594,0.00017897382,0.0002168329,0.00029190138],"about_ca_topic_score_codex":0.00008350596,"about_ca_topic_score_gemma":0.00016939604,"teacher_disagreement_score":0.35751283,"about_ca_system_score_codex":0.000121618694,"about_ca_system_score_gemma":0.000036908154,"threshold_uncertainty_score":0.87286645},"labels":[],"label_agreement":null},{"id":"W2101483070","doi":"10.1061/9780784413616.003","title":"Interoperability between Building Design and Building Energy Analysis","year":2014,"lang":"en","type":"article","venue":"Computing in Civil and Building Engineering (2014)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Interoperability; Computer science; Parametric design; Software engineering; Building information modeling; Efficient energy use; Software; Engineering design process; Systems engineering; Engineering; Parametric statistics; World Wide Web; Operating system","score_opus":0.007568368117697864,"score_gpt":0.2034124421689871,"score_spread":0.19584407405128923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101483070","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43559152,0.00049874524,0.5633377,0.000014711517,0.0002036021,0.000041437925,0.0000010081316,0.00027056303,0.000040759063],"genre_scores_gemma":[0.9467469,0.00007120774,0.052872464,0.000016164066,0.00023831947,0.0000070630645,0.0000031422412,0.000040599858,0.0000041654175],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984763,0.00006862998,0.00045655927,0.00044862845,0.00014436446,0.00040550515],"domain_scores_gemma":[0.9991784,0.00035405302,0.000055820536,0.00023775335,0.00004175666,0.00013218344],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000779039,0.0003138687,0.00047315352,0.00060440914,0.000115103336,0.0001659168,0.0001649427,0.00015946313,0.000008494127],"category_scores_gemma":[0.00008822482,0.0003230209,0.000079637735,0.00051671907,0.000050551393,0.00017698202,0.00010122379,0.00033146568,8.8242274e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037320797,0.00000742554,0.02417512,0.00013090804,0.00018298825,0.0000016313579,0.00019358676,0.90382147,0.014368219,0.0051156054,0.000076734206,0.05192258],"study_design_scores_gemma":[0.00024232165,0.00002790775,0.01898502,0.00016367294,0.000097838594,0.0000119991955,0.000011928515,0.9743601,0.0038008203,0.00050044904,0.001421118,0.0003768425],"about_ca_topic_score_codex":0.00007400583,"about_ca_topic_score_gemma":0.000015724461,"teacher_disagreement_score":0.51115537,"about_ca_system_score_codex":0.00009945673,"about_ca_system_score_gemma":0.000008096599,"threshold_uncertainty_score":0.99992216},"labels":[],"label_agreement":null},{"id":"W2102242875","doi":"10.1109/wsc.2002.1166454","title":"Optimal construction project planning","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Component (thermodynamics); Computer science; Work (physics); Pre-construction services; Systems engineering; Construction management; Production (economics); Project planning; Engineering management; Construction engineering; Process management; Project management; Engineering","score_opus":0.013061123548307976,"score_gpt":0.22578593178838732,"score_spread":0.21272480824007933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102242875","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27658546,0.00011861559,0.21823955,0.0000077219265,0.0010415278,0.00008856449,0.000001052751,0.0006274132,0.5032901],"genre_scores_gemma":[0.96337354,0.0000055075616,0.036184527,0.00001143489,0.00003806987,0.000010981896,0.0000021362255,0.000008300772,0.00036550974],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99974304,0.00000704652,0.00007638121,0.000054526536,0.000042488577,0.00007650304],"domain_scores_gemma":[0.99991125,0.0000053342615,0.000006382636,0.000048126363,0.00001456223,0.000014344187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002796554,0.000051642073,0.00004080762,0.000049250026,0.00003070472,0.000020359656,0.000016513874,0.00003796737,0.00022928268],"category_scores_gemma":[0.000005629942,0.000047134792,0.000016844799,0.00008695013,0.000017068904,0.00009183464,0.0000010552722,0.00006035639,0.000028285662],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011134331,0.000015486632,0.010505249,0.000050595492,0.00009311425,0.000006033074,0.0007429685,0.08581181,0.011878845,0.78028667,0.01909514,0.09150296],"study_design_scores_gemma":[0.0014841305,0.000116364834,0.0016827026,0.00007256403,0.000047908357,0.0015060032,0.009383096,0.14662004,0.2393834,0.003505975,0.5950309,0.0011668996],"about_ca_topic_score_codex":0.0000024483213,"about_ca_topic_score_gemma":7.9463985e-7,"teacher_disagreement_score":0.7767807,"about_ca_system_score_codex":0.000017022074,"about_ca_system_score_gemma":0.000011208341,"threshold_uncertainty_score":0.25104845},"labels":[],"label_agreement":null},{"id":"W2102270393","doi":"10.1108/09699980310478412","title":"Photo‐net: an integrated system for controlling construction progress","year":2003,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Network for Business Sustainability","funders":"","keywords":"Computer science; Critical path method; Animation; Scheduling (production processes); Path (computing); Real-time computing; Systems engineering; Operating system; Computer graphics (images); Engineering","score_opus":0.00492735959806024,"score_gpt":0.18732480764713247,"score_spread":0.18239744804907224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102270393","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1848154,0.00028074905,0.8034587,0.000024214329,0.0054047927,0.0013473792,0.00003430026,0.0024338728,0.0022006002],"genre_scores_gemma":[0.83929056,0.000011925518,0.15992649,0.000008176717,0.00016233433,0.00044550202,0.000052305222,0.00006556918,0.000037143516],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836665,0.000045632692,0.0005315612,0.00039108814,0.00021759018,0.00044747526],"domain_scores_gemma":[0.9993299,0.000030287409,0.00008661664,0.00029668128,0.00010957508,0.00014691625],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020702719,0.0003922768,0.00032737924,0.00044038292,0.00018482337,0.00015547125,0.00013328392,0.0001246746,0.000047566202],"category_scores_gemma":[0.000016370012,0.00039114582,0.0001436208,0.00038386398,0.000112138,0.00026162722,0.000011430092,0.00026111136,0.000010498011],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066655084,0.000019119281,0.00025036559,0.0008262415,0.000441204,0.000007306679,0.00017205025,0.337538,0.004094727,0.24536765,0.000053447948,0.4111632],"study_design_scores_gemma":[0.005145491,0.00027690345,0.0008226752,0.00061886024,0.00037780934,0.0019817222,0.004494896,0.8758987,0.039437957,0.001369277,0.067648284,0.0019274033],"about_ca_topic_score_codex":0.0000049730756,"about_ca_topic_score_gemma":0.0000035511493,"teacher_disagreement_score":0.65447515,"about_ca_system_score_codex":0.00025957904,"about_ca_system_score_gemma":0.000016257036,"threshold_uncertainty_score":0.999854},"labels":[],"label_agreement":null},{"id":"W2102693609","doi":"10.1139/cjce-2014-0153","title":"Construction knowledge discovery system using fuzzy approach","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Data mining; Computer science; Knowledge base; Task (project management); Fuzzy logic; Knowledge extraction; Process (computing); Relation (database); Machine learning; Fuzzy set; Artificial intelligence; Industrial engineering; Engineering; Systems engineering","score_opus":0.0076849655397098725,"score_gpt":0.16889098319261575,"score_spread":0.16120601765290588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102693609","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08499207,0.0012395366,0.87579745,0.000006481951,0.004612243,0.00006233039,0.000006563922,0.00009391753,0.03318942],"genre_scores_gemma":[0.99623764,0.000004770093,0.0030978173,0.0000025415954,0.00060691824,0.0000014003007,0.0000014945575,0.00003052093,0.00001687223],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928313,0.000015842834,0.00032206895,0.0000719502,0.00008401212,0.00022300858],"domain_scores_gemma":[0.9994431,0.00001864039,0.00006103664,0.00010330755,0.00009686693,0.000277027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017640291,0.00013763718,0.00020015967,0.00041885013,0.00006267058,0.00010393214,0.00010920325,0.00009140234,0.000011241651],"category_scores_gemma":[0.000027454322,0.00014116366,0.0000858586,0.00021489116,0.00002997902,0.00040245723,0.0000028612353,0.00024401753,0.0000034110155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020537818,0.0000026130213,0.00069158035,0.0003258051,0.000088233835,0.0000075746375,0.000280853,0.9397419,0.0028723483,0.050160393,0.00039091022,0.0054357275],"study_design_scores_gemma":[0.00038067787,0.000027869504,0.0005770044,0.00043747696,0.0000673993,0.002450021,0.00059963064,0.9819488,0.00086701254,0.00013031665,0.012159118,0.00035466315],"about_ca_topic_score_codex":0.000112349,"about_ca_topic_score_gemma":0.0032427672,"teacher_disagreement_score":0.9112456,"about_ca_system_score_codex":0.0003751742,"about_ca_system_score_gemma":0.00017082274,"threshold_uncertainty_score":0.5756487},"labels":[],"label_agreement":null},{"id":"W2102934494","doi":"10.1260/1478-0771.9.2.167","title":"Aviva Stadium: A Parametric Success","year":2011,"lang":"en","type":"article","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Stadium; Documentation; Identification (biology); Software; Parametric statistics; Engineering; Construction engineering; Computer science; Parametric model; Architectural engineering; Software engineering; Engineering drawing; Systems engineering; Programming language","score_opus":0.016932431879183828,"score_gpt":0.23228867149734,"score_spread":0.21535623961815617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102934494","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92174006,0.0001461857,0.07061776,0.00005551089,0.0027575928,0.000027159313,0.000001923845,0.000055020377,0.004598776],"genre_scores_gemma":[0.9903781,0.0000089808555,0.009089463,0.00003607722,0.00046266036,2.0009358e-7,0.0000010993128,0.000010474574,0.000012987987],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99913114,0.00002278834,0.00038641738,0.000060692197,0.0002817087,0.000117221614],"domain_scores_gemma":[0.999418,0.000062424006,0.00014409394,0.00005173975,0.00026595313,0.000057755722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013310235,0.000093880415,0.00011674752,0.00038422723,0.00002691666,0.000050040842,0.00034057721,0.000031999134,0.00010295499],"category_scores_gemma":[0.000042450403,0.000078208424,0.000103200065,0.00015735273,0.000032200944,0.00015497845,0.000020324236,0.00027933044,0.000010937671],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013236671,0.00004475232,0.02537572,0.00002066938,0.00051683607,0.00013187618,0.003224756,0.038604204,0.0040274574,0.004279361,0.00036357582,0.92327845],"study_design_scores_gemma":[0.0049849236,0.000886554,0.447137,0.000987859,0.00018297632,0.0220907,0.0014191242,0.3544435,0.12199996,0.03646727,0.007621977,0.0017781781],"about_ca_topic_score_codex":0.000018036773,"about_ca_topic_score_gemma":0.000004662308,"teacher_disagreement_score":0.92150027,"about_ca_system_score_codex":0.000064424254,"about_ca_system_score_gemma":0.000019019539,"threshold_uncertainty_score":0.3189247},"labels":[],"label_agreement":null},{"id":"W2103542225","doi":"10.1061/9780784412329.060","title":"A Semantic Approach to Representation, Sharing, and Discovery of Construction Simulation Models","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Composability; Computer science; Interoperability; Reuse; Structuring; Metadata; Ontology; Building information modeling; Semantic Web; Information model; Data modeling; Representation (politics); Software engineering; Data science; Information retrieval; World Wide Web; Distributed computing; Engineering","score_opus":0.07197037850791876,"score_gpt":0.33439199062289715,"score_spread":0.2624216121149784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103542225","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68439716,0.0010219315,0.29427198,0.000052030806,0.001886159,0.00076190656,0.000027991013,0.00021586574,0.01736495],"genre_scores_gemma":[0.99289656,0.0001208232,0.0063142786,0.0000058810724,0.00024074322,0.00009067096,0.0000220715,0.000029755156,0.0002792396],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981715,0.00011695203,0.00044743135,0.000303408,0.00051933224,0.00044136177],"domain_scores_gemma":[0.99873006,0.00011806049,0.00007865644,0.00035519243,0.0005031079,0.00021490219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060239295,0.00017794344,0.00024739822,0.0006157457,0.00018442927,0.00014006362,0.00013750292,0.0001584672,0.00005426236],"category_scores_gemma":[0.000110593486,0.00018187895,0.000054295488,0.0006879958,0.0004988207,0.0025332186,0.000084345804,0.00031442818,0.000016710876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016916977,0.00013480814,0.11247816,0.00056441326,0.0002515655,7.084979e-7,0.0021354975,0.15761359,0.009522801,0.585997,0.0017534916,0.12937878],"study_design_scores_gemma":[0.00134053,0.00008747062,0.012894232,0.00023099869,0.0000877921,0.00033246644,0.00657324,0.9364939,0.015915345,0.021880789,0.0033812518,0.0007820132],"about_ca_topic_score_codex":0.000046995374,"about_ca_topic_score_gemma":0.0000067137744,"teacher_disagreement_score":0.7788803,"about_ca_system_score_codex":0.0000921344,"about_ca_system_score_gemma":0.0000336377,"threshold_uncertainty_score":0.7416808},"labels":[],"label_agreement":null},{"id":"W2104308428","doi":"10.7492/ijaec.2012.003","title":"Factors Affecting Productivity of Pipe Spool Fabrication","year":2012,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Fabrication; Marine engineering; Engineering; Environmental science; Manufacturing engineering; Automotive engineering; Economics; Medicine","score_opus":0.0059267918303271515,"score_gpt":0.19951011227014834,"score_spread":0.19358332043982118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104308428","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8507854,0.0003910782,0.14538583,0.000028905111,0.003233258,0.000037041653,0.000003848274,0.000040643787,0.00009400623],"genre_scores_gemma":[0.9943482,0.00003156668,0.004872551,0.0000017596257,0.00072752865,8.707216e-7,0.000002602853,0.000011542817,0.0000033254862],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993446,0.000014637726,0.00028095022,0.000056415032,0.000202679,0.000100731144],"domain_scores_gemma":[0.99949896,0.000055613666,0.00014160847,0.00005391245,0.00019203694,0.000057852278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015004259,0.000110255234,0.00014012489,0.0002933064,0.000019518668,0.000018362984,0.00007621126,0.00005455751,0.000011399925],"category_scores_gemma":[0.00010490699,0.00009436961,0.00008046728,0.00010515951,0.00003818941,0.00028401762,0.000010005841,0.00022152904,3.1097986e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006242238,0.00005599862,0.07852402,0.00014077728,0.00066453277,0.0000014168901,0.0033671693,0.047697704,0.24399501,0.0030051877,0.000037566297,0.6224482],"study_design_scores_gemma":[0.0011479309,0.00017639434,0.29070976,0.00043910014,0.0001981002,0.0028516857,0.0019374972,0.008256563,0.6873543,0.0011096802,0.0051635695,0.0006553972],"about_ca_topic_score_codex":0.0000027560168,"about_ca_topic_score_gemma":5.666816e-7,"teacher_disagreement_score":0.6217928,"about_ca_system_score_codex":0.000048812683,"about_ca_system_score_gemma":0.000011360521,"threshold_uncertainty_score":0.3848281},"labels":[],"label_agreement":null},{"id":"W2104466993","doi":"10.5555/2431518.2431928","title":"Integrating realtime project progress input into a construction simulation model","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Simulation modeling; Systems engineering; Project management; Data modeling; Industrial engineering; Constraint (computer-aided design); Project planning; Simulation; Software engineering; Engineering","score_opus":0.048601560744603374,"score_gpt":0.2811105876522935,"score_spread":0.23250902690769015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104466993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09359254,0.000033502056,0.8911094,0.00002121567,0.00054357306,0.00042512902,0.000007804406,0.00074736716,0.013519482],"genre_scores_gemma":[0.96267873,0.0000046770156,0.036967542,0.00002840632,0.00009535513,0.00006233699,0.000035953704,0.000032881388,0.00009414181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871933,0.000048860264,0.0005012364,0.0003032449,0.0002049324,0.00022239496],"domain_scores_gemma":[0.99911565,0.000046917925,0.00012280789,0.00026037934,0.00038963754,0.00006460239],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001185782,0.00025497598,0.00020170194,0.00024971846,0.000119705845,0.0001041242,0.00014845007,0.00017866913,0.0002012854],"category_scores_gemma":[0.00004384988,0.00024806982,0.0000731168,0.00026382998,0.00013323758,0.00075865845,0.000027597378,0.00025457816,0.00004490796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007095003,0.000030113537,0.0027690385,0.00007031479,0.000048251204,0.0000012549798,0.008404136,0.7388169,0.0006059089,0.016154839,0.00005029735,0.232978],"study_design_scores_gemma":[0.00028198538,0.000045639383,0.00040295915,0.000095997,0.00002028945,0.0000056190747,0.00040643188,0.99113935,0.0012013628,0.0058455556,0.0002895096,0.00026527743],"about_ca_topic_score_codex":0.00003793177,"about_ca_topic_score_gemma":0.00005699637,"teacher_disagreement_score":0.86908615,"about_ca_system_score_codex":0.000112229995,"about_ca_system_score_gemma":0.00007824481,"threshold_uncertainty_score":0.99999714},"labels":[],"label_agreement":null},{"id":"W2104775765","doi":"","title":"IMPLEMENTATION OF A DISTRIBUTED, MODEL-BASED INTEGRATED ASSET MANAGEMENT SYSTEM","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Public Works and Government Services Canada","keywords":"Interoperability; Computer science; Software engineering; Systems engineering; Asset management; Data exchange; Reference architecture; Software architecture; Database; Software; Engineering; Operating system","score_opus":0.007817523708784089,"score_gpt":0.2219679602187689,"score_spread":0.21415043650998483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104775765","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06171672,0.000010871227,0.914238,0.000010778277,0.0001765835,0.00014868437,0.00009014632,0.00016362235,0.02344461],"genre_scores_gemma":[0.9883159,0.0000025284262,0.011514255,0.000005199206,0.0000047047542,0.000042442156,0.00008551972,0.000008591237,0.000020867465],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954885,0.000017041444,0.00017944245,0.00007154141,0.00009406338,0.00008903716],"domain_scores_gemma":[0.99979436,0.0000048918578,0.000027697999,0.000103509024,0.000046007965,0.000023519997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006399675,0.00007203655,0.00007817194,0.000062031024,0.00002045063,0.0000117001055,0.00003957286,0.000032040734,0.000139848],"category_scores_gemma":[0.0000013810159,0.00006885975,0.00003084859,0.00015173026,0.000010706521,0.000047503814,0.000002178901,0.000044586483,0.000007133753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015760177,0.00003400597,0.0024402859,0.0006407281,0.00015803408,0.0000038813196,0.00010129898,0.15948828,0.028062912,0.72773427,0.007726878,0.07359367],"study_design_scores_gemma":[0.00087892695,0.000025926156,0.00044832387,0.000072747964,0.000056844696,0.000006328434,0.0027046283,0.8914269,0.09831346,0.0018699741,0.00401027,0.00018562302],"about_ca_topic_score_codex":0.000004917509,"about_ca_topic_score_gemma":0.000011247896,"teacher_disagreement_score":0.92659914,"about_ca_system_score_codex":0.00009752516,"about_ca_system_score_gemma":0.000015884092,"threshold_uncertainty_score":0.2808019},"labels":[],"label_agreement":null},{"id":"W2105004520","doi":"10.1061/9780784413517.170","title":"An Automatic Scheduling Approach: Building Information Modeling-based Onsite Scheduling for Panelized Construction","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Schedule; Scheduling (production processes); Modular design; Computer science; Application programming interface; Construction management; Software engineering; Systems engineering; User interface; Engineering; Construction engineering; Operating system; Civil engineering; Operations management","score_opus":0.03457006351762062,"score_gpt":0.3043029006371238,"score_spread":0.2697328371195032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105004520","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23391834,0.00008446162,0.7615777,0.00006879921,0.001785965,0.0007529102,0.000027328104,0.0008946772,0.0008897586],"genre_scores_gemma":[0.7161253,0.000017681226,0.2829534,0.000030042022,0.00032867954,0.0003170379,0.00017751894,0.000045639215,0.000004705458],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99688435,0.00035191834,0.0008595442,0.00045383087,0.00075448304,0.00069587963],"domain_scores_gemma":[0.9972205,0.00024126712,0.00017205055,0.00060281815,0.0014559849,0.00030736337],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020525735,0.00036029535,0.0004202186,0.0011429716,0.0007968827,0.0006762655,0.00034870405,0.00039493322,0.000089560446],"category_scores_gemma":[0.00052091986,0.00038353604,0.00015554305,0.00059213437,0.0005002629,0.0018986703,0.000031308653,0.0007432543,0.00006112088],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008267149,0.000025356141,0.0004459334,0.00045504683,0.00006532193,2.2788507e-7,0.00011880942,0.69648653,0.0049480046,0.07908396,0.00011189137,0.21817625],"study_design_scores_gemma":[0.001561878,0.00009220861,0.000028653985,0.00014628367,0.000034857145,0.00005998431,0.0012590087,0.9865616,0.0036031173,0.004634184,0.0016087834,0.0004094269],"about_ca_topic_score_codex":0.000033441353,"about_ca_topic_score_gemma":0.000008423583,"teacher_disagreement_score":0.48220694,"about_ca_system_score_codex":0.0002515864,"about_ca_system_score_gemma":0.00020638626,"threshold_uncertainty_score":0.99986166},"labels":[],"label_agreement":null},{"id":"W2105280861","doi":"10.1061/9780784412329.019","title":"A Conceptual Model to Develop a Worker Performance Measurement Tool to Improve Construction Productivity","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Productivity; Index (typography); Construction industry; Supervisor; Knowledge management; Computer science; Performance management; Business; Process management; Engineering; Marketing; Economics; Construction engineering; Management; Economic growth","score_opus":0.06915757848174153,"score_gpt":0.2981003998236081,"score_spread":0.22894282134186655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105280861","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9096354,0.00043311928,0.07416786,0.0004273735,0.0073477915,0.0017379072,0.000043427855,0.00053710514,0.005669976],"genre_scores_gemma":[0.97343844,0.000037731283,0.024221549,0.000049493712,0.00081336265,0.0007718613,0.0000078116755,0.00005660968,0.0006031571],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99626404,0.00017656123,0.0005403521,0.00050825265,0.0013633572,0.0011474607],"domain_scores_gemma":[0.996048,0.00005164586,0.000063905674,0.00055804447,0.0026764432,0.0006019665],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0020563079,0.000345182,0.0003214127,0.0006294141,0.00043802906,0.00016310303,0.0002706849,0.00022600986,0.000318681],"category_scores_gemma":[0.00058968563,0.00034854317,0.000060461654,0.0015547092,0.000564311,0.0015404111,0.00013844368,0.00073315436,0.00060095266],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025366625,0.00007465996,0.010934902,0.00009664712,0.00014644512,8.843793e-7,0.0013783653,0.0066916347,0.05110904,0.030848775,0.01679424,0.8816707],"study_design_scores_gemma":[0.0036996624,0.00059407,0.029720988,0.00082981825,0.00014607793,0.000756161,0.0077879955,0.060723603,0.40722945,0.0014389616,0.483059,0.004014205],"about_ca_topic_score_codex":0.0000133137855,"about_ca_topic_score_gemma":0.000032429474,"teacher_disagreement_score":0.8776565,"about_ca_system_score_codex":0.000797885,"about_ca_system_score_gemma":0.0003813879,"threshold_uncertainty_score":0.99989665},"labels":[],"label_agreement":null},{"id":"W2105945972","doi":"10.5555/2433508.2433904","title":"3D CAD modeling and visualization of the tunnel construction process in a distributed simulation environment","year":2010,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; University of Alberta","funders":"","keywords":"Visualization; Computer science; Process (computing); CAD; Building information modeling; Animation; Systems engineering; Software engineering; Computer animation; Computer Aided Design; Solid modeling; Simulation modeling; Engineering; Engineering drawing; Data mining","score_opus":0.013846908139745628,"score_gpt":0.24258463882657424,"score_spread":0.22873773068682862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105945972","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5664237,0.0000057820826,0.433115,0.000014198236,0.00018457511,0.000118988995,0.000008006391,0.000031025655,0.000098741126],"genre_scores_gemma":[0.9996348,0.0000042669744,0.00027945463,0.000006119926,0.00002834264,0.000010950362,0.000022795282,0.000009122121,0.000004142393],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933827,0.000022339867,0.00029433807,0.0001336705,0.00012814987,0.00008324804],"domain_scores_gemma":[0.99966055,0.000034385932,0.00006633738,0.00012205568,0.00009382508,0.00002284594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006833625,0.00010085878,0.00009791725,0.00007487453,0.000043370423,0.000029570576,0.00005874984,0.00009800734,0.00006665771],"category_scores_gemma":[0.000036543806,0.00008759843,0.000020332745,0.00012949995,0.00006530718,0.00024367835,0.000013562939,0.00014499777,0.0000015435106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000865027,0.0000074075106,0.010629959,0.000022599808,0.000004362172,4.239183e-8,0.00049955584,0.97762275,0.0030384937,0.0015761596,2.7887407e-7,0.006589718],"study_design_scores_gemma":[0.00025490508,0.0000068176614,0.007803945,0.00004153671,0.000008222561,0.0000019381193,0.00015105565,0.9892416,0.0011503546,0.0012132311,0.00003785994,0.00008854947],"about_ca_topic_score_codex":0.000009017478,"about_ca_topic_score_gemma":0.00005590522,"teacher_disagreement_score":0.43321112,"about_ca_system_score_codex":0.000026412818,"about_ca_system_score_gemma":0.000016151702,"threshold_uncertainty_score":0.35721603},"labels":[],"label_agreement":null},{"id":"W2106145744","doi":"10.5555/510378.510656","title":"Simphony: an integrated environment for construction simulation","year":2000,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Animation; Software engineering; Systems engineering; Representation (politics); User Friendly; Computer animation; Human–computer interaction; Engineering; Programming language","score_opus":0.019761290839140116,"score_gpt":0.2403198047283354,"score_spread":0.22055851388919528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106145744","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14950785,0.000015370835,0.8477055,0.000032243384,0.00039140557,0.00034955857,0.00004135954,0.00037895053,0.0015777694],"genre_scores_gemma":[0.99305576,0.000011013901,0.006092035,0.000047654346,0.00014340863,0.000049036127,0.00021238139,0.00002656855,0.00036211437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908775,0.000032432843,0.0003317278,0.0002447171,0.00013077223,0.00017261614],"domain_scores_gemma":[0.9994863,0.00007301975,0.000042021682,0.00021296386,0.0001097892,0.00007585623],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000068948015,0.00018662988,0.00014381418,0.000089454894,0.00009413428,0.00010009511,0.000092356335,0.00013319342,0.004022745],"category_scores_gemma":[0.000011647074,0.00019088073,0.000050580737,0.0000900981,0.00006267615,0.00054730487,0.0000042283305,0.000107927735,0.0001258349],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003116538,0.000008763371,0.000065245134,0.000005995466,0.000009642392,8.764876e-8,0.00014275564,0.60079557,0.0004697899,0.00044936838,0.000019348216,0.3980023],"study_design_scores_gemma":[0.0004190367,0.00007318583,0.0005036709,0.000017342845,0.000016297661,0.0000023202074,0.00010699717,0.91152453,0.0013662108,0.00099359,0.08477616,0.00020063928],"about_ca_topic_score_codex":0.000007442429,"about_ca_topic_score_gemma":0.000014302121,"teacher_disagreement_score":0.84354794,"about_ca_system_score_codex":0.00009387146,"about_ca_system_score_gemma":0.000019337227,"threshold_uncertainty_score":0.9968877},"labels":[],"label_agreement":null},{"id":"W2106384226","doi":"","title":"CASE STUDIES ON THE USE OF INFORMATION TECHNOLOGY IN THE CANADIAN CONSTRUCTION INDUSTRY","year":2004,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Compendium; Engineering; Engineering management; Workflow; Architecture; Computer science; World Wide Web","score_opus":0.01800397573966054,"score_gpt":0.2245304942905523,"score_spread":0.20652651855089177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106384226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98887813,0.000049212824,0.0031899402,0.0059864456,0.0011964537,0.00031151526,0.000013381384,0.000065759785,0.00030918888],"genre_scores_gemma":[0.994971,0.00009644773,0.0047217174,0.00015704911,0.000026181831,0.000019285864,0.0000035910775,0.0000043371765,4.3514078e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99825466,0.00004141364,0.0012450885,0.000049490423,0.0002244241,0.0001849359],"domain_scores_gemma":[0.99855286,0.00008471139,0.0006496943,0.00021412114,0.00047037244,0.000028266863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005185596,0.0001544529,0.00023009058,0.0037307378,0.00015857462,0.00006992761,0.0002117546,0.00069358025,0.000009153671],"category_scores_gemma":[0.0006204105,0.000107279964,0.00005029744,0.0019051998,0.0005764673,0.0022746488,0.000014249049,0.001506877,0.0000082435845],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004293301,0.000017716591,0.009207025,0.000055747023,0.00010393641,0.00005767621,0.003190016,0.07790432,0.00012800314,0.7314002,0.00027147282,0.17762098],"study_design_scores_gemma":[0.0064397925,0.0010228821,0.0039192806,0.0014743082,0.00016578082,0.19693464,0.3475502,0.008244864,0.07012649,0.35182577,0.011250425,0.0010455563],"about_ca_topic_score_codex":0.00054134487,"about_ca_topic_score_gemma":0.004465356,"teacher_disagreement_score":0.37957442,"about_ca_system_score_codex":0.0006536573,"about_ca_system_score_gemma":0.0002638141,"threshold_uncertainty_score":0.65467143},"labels":[],"label_agreement":null},{"id":"W2107426637","doi":"10.1139/l01-004","title":"Performance measurement indices for simulated construction operations","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Process (computing); Key (lock); Probabilistic logic; Range (aeronautics); Industrial engineering; Performance prediction; Reliability engineering; Artificial intelligence; Machine learning; Simulation; Engineering","score_opus":0.01261772601370272,"score_gpt":0.18037044343119316,"score_spread":0.16775271741749043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107426637","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7419539,0.0013509196,0.24989638,0.00011728514,0.0036824136,0.00020326453,0.000011842353,0.00009146813,0.0026925206],"genre_scores_gemma":[0.99874437,0.00005547278,0.00093587564,0.000009283956,0.0002209178,0.0000035839946,0.0000021095368,0.000016702821,0.000011680429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994186,0.0000034810275,0.00025749454,0.000045707522,0.000106418265,0.00016830032],"domain_scores_gemma":[0.9994552,0.000009835109,0.000027480002,0.000055984514,0.00026178212,0.00018972826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014322276,0.000090414025,0.00010792651,0.00032186555,0.00007945269,0.000051471707,0.000071887545,0.000057523852,0.000095833115],"category_scores_gemma":[0.000044412234,0.00009406474,0.000050994033,0.00016751024,0.000015595719,0.00027902634,8.9556664e-7,0.0001294902,0.000002241167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023355256,9.771143e-7,0.0013714357,0.00002422477,0.00004141366,0.0000024738317,0.000096881515,0.9899836,0.0014039773,0.00033463366,0.00023331965,0.0065047382],"study_design_scores_gemma":[0.0005233374,0.00007062839,0.003119128,0.00019063227,0.000042673255,0.000458849,0.00012198721,0.94525105,0.0018750096,0.000042177286,0.04808336,0.00022115855],"about_ca_topic_score_codex":0.00007099677,"about_ca_topic_score_gemma":0.023048813,"teacher_disagreement_score":0.25679046,"about_ca_system_score_codex":0.00021845548,"about_ca_system_score_gemma":0.00018828499,"threshold_uncertainty_score":0.994778},"labels":[],"label_agreement":null},{"id":"W2107642345","doi":"10.5555/2675983.2676364","title":"Location-aware real-time simulation framework for earthmoving projects using automated machine guidance","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Context (archaeology); Identification (biology); Retrofitting; Computer science; Construction industry; Systems engineering; Engineering; Industrial engineering; Construction engineering","score_opus":0.01528824604090179,"score_gpt":0.26300224463466065,"score_spread":0.24771399859375887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107642345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10451076,0.000048419595,0.8917353,0.000038354065,0.00026081342,0.0005270779,0.000003817991,0.0019330109,0.00094242505],"genre_scores_gemma":[0.8981489,0.000002762272,0.10143147,0.000024590987,0.00010195932,0.00006367454,0.00002075019,0.000026606724,0.00017930067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994077,0.000011773093,0.00021687521,0.00012873144,0.00008438542,0.00015051548],"domain_scores_gemma":[0.999478,0.00009062814,0.000039467846,0.00014181292,0.00021438154,0.000035722966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052760104,0.0001137611,0.0000990066,0.000074011565,0.00009300974,0.000076796125,0.00004945816,0.000114217895,0.0002907241],"category_scores_gemma":[0.000054225933,0.000107576365,0.000030207904,0.00022457303,0.00001338949,0.00033069958,0.0000061916285,0.00006650142,0.00009450207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038562152,0.000007688873,0.00067422533,0.00011017119,0.000023174534,1.0428838e-7,0.00014263051,0.973101,0.010604843,0.0038625342,0.000558551,0.0109111825],"study_design_scores_gemma":[0.00010262277,0.000010553984,0.001296122,0.00008053014,0.0000075794374,0.000002105168,0.000047419235,0.9951892,0.0019917483,0.0010421675,0.00009718749,0.00013279528],"about_ca_topic_score_codex":0.00016361367,"about_ca_topic_score_gemma":0.000011279323,"teacher_disagreement_score":0.7936381,"about_ca_system_score_codex":0.00006296397,"about_ca_system_score_gemma":0.000023112674,"threshold_uncertainty_score":0.4386837},"labels":[],"label_agreement":null},{"id":"W2107712205","doi":"10.22260/isarc2009/0045","title":"Impact of Fast Automated Tracking of Construction Components on Labor Productivity","year":2009,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Productivity; Tracking (education); Computer science; Automation; Engineering; Economics; Mechanical engineering","score_opus":0.010635980976854153,"score_gpt":0.23468409556212086,"score_spread":0.22404811458526672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107712205","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99664754,0.000020782783,0.00001893677,0.000066077,0.00020005311,0.0001520774,0.00001930581,0.00015288136,0.0027223595],"genre_scores_gemma":[0.99951494,0.0000056720814,0.00041697832,0.0000026286182,0.00003752593,0.0000020139062,0.0000011610485,0.000008637707,0.0000104388955],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993483,0.000004044227,0.00026094058,0.000100520134,0.00018263818,0.00010359573],"domain_scores_gemma":[0.9994377,0.000009454171,0.00018780217,0.00007771399,0.0002666857,0.000020671734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008991327,0.00011141159,0.00019548484,0.00009918935,0.000029685783,0.000009554368,0.00012658977,0.000058816076,0.000010926265],"category_scores_gemma":[0.000044029177,0.00007914407,0.00010359462,0.00031014736,0.00009433959,0.00018869848,0.000009025505,0.00011663804,7.892199e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057682948,0.00007129646,0.03398978,0.00010113116,0.000055227814,1.9976353e-8,0.00039536398,0.00080522,0.93992263,0.0030994348,0.00022491878,0.021277282],"study_design_scores_gemma":[0.00025227366,0.00013312307,0.40236023,0.00017265782,0.000022828392,0.000014204162,0.00014258864,0.0066071386,0.5892877,0.00090981193,0.000013738822,0.00008373994],"about_ca_topic_score_codex":0.000017999597,"about_ca_topic_score_gemma":4.9102226e-7,"teacher_disagreement_score":0.36837044,"about_ca_system_score_codex":0.000051601713,"about_ca_system_score_gemma":0.000013053195,"threshold_uncertainty_score":0.32274014},"labels":[],"label_agreement":null},{"id":"W2109097342","doi":"10.5555/2675983.2676375","title":"Simulation and optimization of temporary road network in mass earthmoving projects","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"North American Construction Group (Canada); University of Alberta","funders":"","keywords":"Haulage; Linear programming; Duration (music); Transport engineering; Engineering; Total cost; Computer science; Operations research; Algorithm","score_opus":0.02046858000852035,"score_gpt":0.23057036856741417,"score_spread":0.21010178855889383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109097342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2891001,0.00005654413,0.7086505,0.000024366469,0.0001781404,0.00028594706,0.000001362239,0.000090813475,0.0016122101],"genre_scores_gemma":[0.9948032,0.000005804018,0.005041151,0.000014406819,0.000051327537,0.000017302758,0.000014690072,0.000011667292,0.00004045647],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993378,0.00003236716,0.00030292652,0.00012850852,0.00009061418,0.00010781262],"domain_scores_gemma":[0.9995975,0.00007651465,0.00006238275,0.00009844897,0.00013728475,0.000027867622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006801797,0.00010129122,0.00012156869,0.00011220286,0.000023681023,0.000053130007,0.000041546045,0.00008222726,0.00021046144],"category_scores_gemma":[0.000030370553,0.00010416695,0.000017919003,0.00017380148,0.00002688887,0.0005544733,0.000010544635,0.00008625687,0.000006805753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050977424,0.0000034979366,0.015437367,0.000023678098,0.000005169502,1.3117935e-7,0.00022461746,0.96421003,0.00021825812,0.00020399134,0.000008568369,0.019659614],"study_design_scores_gemma":[0.0002073934,0.00001587009,0.018034019,0.00008655649,0.0000025736442,3.553355e-7,0.00009387026,0.98087347,0.000109492845,0.0004382141,0.00003945484,0.00009875052],"about_ca_topic_score_codex":0.000040059014,"about_ca_topic_score_gemma":0.000017479239,"teacher_disagreement_score":0.7057031,"about_ca_system_score_codex":0.000020372741,"about_ca_system_score_gemma":0.000015382826,"threshold_uncertainty_score":0.4247805},"labels":[],"label_agreement":null},{"id":"W2109368067","doi":"10.5555/2675983.2676379","title":"A discrete event simulation model of asphalt paving operations","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Computer science; Simulation modeling; Construction industry; Asphalt; Construction engineering; Engineering; Risk analysis (engineering); Systems engineering; Simulation","score_opus":0.02602556855087651,"score_gpt":0.2619071963162307,"score_spread":0.2358816277653542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109368067","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19811043,0.000016322767,0.7992989,0.000054114706,0.00017828956,0.0002079032,0.000009636105,0.00012147937,0.0020029338],"genre_scores_gemma":[0.99733084,0.000003383056,0.0022379651,0.000029023218,0.000043643548,0.000038241753,0.000025261772,0.000015223608,0.0002764111],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992,0.00002114811,0.00037515437,0.0001374659,0.00014581191,0.00012042229],"domain_scores_gemma":[0.99935883,0.000051055667,0.000042106036,0.00017791936,0.0003210517,0.000049036244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000047600246,0.0001253453,0.00012860057,0.00009232927,0.00005356141,0.00007134734,0.00008770013,0.000074622294,0.00067443965],"category_scores_gemma":[0.000029167972,0.00012088905,0.0000558444,0.00010163032,0.000031756204,0.0006113979,0.00001585644,0.000097588294,0.0000625931],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002431808,0.0000066286393,0.00025631828,0.0000150134665,0.000012899264,3.0743045e-8,0.00043990396,0.97746146,0.005593411,0.0029784867,0.000018985736,0.013214461],"study_design_scores_gemma":[0.00016755177,0.000014418388,0.0009868194,0.000046395806,0.00001047197,3.4190836e-7,0.00008627014,0.99541247,0.0016356348,0.0014466883,0.000067110355,0.00012585188],"about_ca_topic_score_codex":0.000026782407,"about_ca_topic_score_gemma":0.000030385532,"teacher_disagreement_score":0.79922044,"about_ca_system_score_codex":0.000038842798,"about_ca_system_score_gemma":0.000026267435,"threshold_uncertainty_score":0.7384641},"labels":[],"label_agreement":null},{"id":"W2109524929","doi":"10.1016/j.autcon.2006.07.009","title":"Cell-based representation and analysis of spatial resources in construction simulation","year":2006,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Representation (politics); Visualization; Discrete event simulation; Computer science; Resource (disambiguation); Space (punctuation); Industrial engineering; Simulation modeling; Data mining; Systems engineering; Operations research; Simulation; Engineering; Mathematics","score_opus":0.005391978941744774,"score_gpt":0.21942441947591912,"score_spread":0.21403244053417433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109524929","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8698177,0.000062996296,0.12811808,0.000022018794,0.000326401,0.00017933696,0.000012108205,0.00014412543,0.0013172344],"genre_scores_gemma":[0.9945912,0.00001036854,0.0051858732,0.0000039586234,0.000038538023,0.000024908497,0.00012893182,0.0000107656615,0.00000545443],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998704,0.00008501941,0.0006743345,0.00021789668,0.00019723138,0.00012150066],"domain_scores_gemma":[0.99943584,0.00012021248,0.00019306368,0.0001422938,0.00008806012,0.000020506568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015873932,0.00013357574,0.00024460044,0.0015208583,0.00004124015,0.000038936418,0.000037741374,0.00015431765,0.000061489955],"category_scores_gemma":[0.000024688696,0.00015813868,0.000059025144,0.001452543,0.00012470089,0.00035411667,0.00000556513,0.000113690076,0.0000016732671],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001650247,0.000013025426,0.26256788,0.000029876628,0.000017278962,4.170822e-7,0.00010663116,0.70410824,0.0021713688,0.0009175331,0.0000046869836,0.030046571],"study_design_scores_gemma":[0.00044153215,0.000009052754,0.36043388,0.000019206063,0.00005876221,0.0000029749935,0.00019359057,0.63361233,0.004203609,0.0009153285,0.000019128272,0.00009062422],"about_ca_topic_score_codex":0.0008378973,"about_ca_topic_score_gemma":0.00075156725,"teacher_disagreement_score":0.1247735,"about_ca_system_score_codex":0.00012377152,"about_ca_system_score_gemma":0.000019103978,"threshold_uncertainty_score":0.6448708},"labels":[],"label_agreement":null},{"id":"W2109702797","doi":"10.5555/1030453.1030716","title":"CEPM 1: selecting earthmoving equipment fleets using genetic algorithms","year":2002,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Genetic algorithm; Computer science; Algorithm; Engineering; Mathematical optimization; Mathematics; Machine learning","score_opus":0.04712280526830158,"score_gpt":0.25262500817074635,"score_spread":0.20550220290244475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109702797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31252038,0.0001225612,0.68166983,0.000023770825,0.0007533209,0.000112510505,0.0000022512054,0.00029823586,0.0044971537],"genre_scores_gemma":[0.99134845,0.000007737748,0.008193698,0.000034641023,0.00019394219,0.000005587379,0.000002737369,0.000020125395,0.00019311265],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991893,0.000023343959,0.0002645112,0.00017609444,0.00014842712,0.00019831125],"domain_scores_gemma":[0.9996187,0.000035307014,0.000042353735,0.00013480792,0.00011364231,0.000055167344],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000043075295,0.00014187739,0.000110535046,0.00009985316,0.000096563126,0.000114670926,0.00007777849,0.00007176507,0.0013213833],"category_scores_gemma":[0.000014774688,0.0001530539,0.000042067844,0.00014506117,0.000021864447,0.000232253,0.000016711541,0.00013529064,0.00009249629],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016310536,0.000008122015,0.001187625,0.000016308959,0.00002216511,0.0000019158902,0.0007844733,0.80209124,0.0049150153,0.00016613139,0.00004221173,0.19076316],"study_design_scores_gemma":[0.00016131638,0.000014334144,0.0009679687,0.000050504896,0.000009971094,0.000013231555,0.000075049116,0.99492925,0.002398895,0.000114495146,0.0010953181,0.00016967964],"about_ca_topic_score_codex":0.000008752242,"about_ca_topic_score_gemma":0.000007936351,"teacher_disagreement_score":0.678828,"about_ca_system_score_codex":0.00007574321,"about_ca_system_score_gemma":0.000008265555,"threshold_uncertainty_score":0.9995915},"labels":[],"label_agreement":null},{"id":"W2109838160","doi":"10.1520/stp10930s","title":"Connectivity of the Air Barrier and Building Envelope System: Materials, Process, and Quality Assurance","year":2003,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Quality assurance; Building envelope; Envelope (radar); Process (computing); Architectural engineering; Quality (philosophy); Computer science; Environmental science; Engineering; Telecommunications; Physics; Operations management; Meteorology; Operating system","score_opus":0.01009407873205208,"score_gpt":0.21035844285060004,"score_spread":0.20026436411854795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109838160","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32151374,0.0022523643,0.0057774526,0.00008396147,0.00225239,0.0008037779,0.0002667614,0.00033903337,0.6667105],"genre_scores_gemma":[0.9905573,0.00009544326,0.00024015595,0.000019365478,0.000040710638,0.000010086925,0.0000017267799,0.000023518418,0.009011708],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99936444,0.000022726581,0.00026929987,0.00015933007,0.000109927234,0.00007427046],"domain_scores_gemma":[0.9996219,0.00003687566,0.000097648815,0.0001460841,0.0000698692,0.000027615342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017849111,0.00017388865,0.00028071477,0.000029893186,0.00005657242,0.00002224102,0.00004888994,0.00019762164,0.000073241325],"category_scores_gemma":[0.00001989899,0.00012419885,0.000026544041,0.000016830787,0.0000880493,0.000077395634,0.000013759278,0.00011825464,9.077851e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000997748,0.000001733864,0.00077964953,0.0030966485,0.000111181864,3.721303e-7,0.00010247715,0.00004500627,0.016388174,0.9772986,0.00021358354,0.0019526015],"study_design_scores_gemma":[0.0019789373,0.000083283056,0.027107805,0.0062174466,0.0005515954,0.0004956338,0.0010060408,0.0007518494,0.8141431,0.039101068,0.1052157,0.003347511],"about_ca_topic_score_codex":0.000024869232,"about_ca_topic_score_gemma":0.00004555343,"teacher_disagreement_score":0.93819755,"about_ca_system_score_codex":0.000030240653,"about_ca_system_score_gemma":0.000022437785,"threshold_uncertainty_score":0.50646824},"labels":[],"label_agreement":null},{"id":"W2110126810","doi":"10.5555/2431518.2431944","title":"Loosely coupled visualization of industrial construction simulation using a gaming engine","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Computer science; Pipeline (software); Distributed Interactive Simulation; Interactive simulation; Window (computing); Data visualization; Virtual reality; Distributed computing; Human–computer interaction; Simulation; Data mining; World Wide Web; Operating system","score_opus":0.08870577620897836,"score_gpt":0.2772172643071387,"score_spread":0.18851148809816037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110126810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3950398,0.000013663951,0.6032971,0.0000014142249,0.0006081959,0.00014400444,0.0000048789952,0.00014902047,0.00074190093],"genre_scores_gemma":[0.99682087,0.0000035289947,0.0029715605,0.000006759722,0.00013044155,0.0000051906377,0.000024975374,0.000023560917,0.000013119657],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892926,0.000041922398,0.00051967613,0.00017714307,0.00018742325,0.00014456546],"domain_scores_gemma":[0.99918973,0.00006368213,0.00016411905,0.00015754269,0.00037616515,0.000048737176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010787452,0.00017142699,0.00019660735,0.00024427447,0.000053878815,0.00003289276,0.00008065582,0.00017991693,0.0005873407],"category_scores_gemma":[0.000060685084,0.00018819713,0.000057712397,0.0002982328,0.00007173525,0.00050034135,0.000013564874,0.00012213725,0.000008985045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055474247,0.000018609535,0.0052045016,0.000025049441,0.000038993443,3.9159997e-7,0.001054411,0.9535047,0.0049726623,0.0032174212,0.0000025195832,0.031905282],"study_design_scores_gemma":[0.00055223005,0.00003791185,0.0008941155,0.00010155223,0.00003703885,0.0000037706704,0.00017834325,0.98926526,0.008187012,0.0004888893,0.000076424665,0.00017743357],"about_ca_topic_score_codex":0.000026656873,"about_ca_topic_score_gemma":0.000008728965,"teacher_disagreement_score":0.6017811,"about_ca_system_score_codex":0.00007140397,"about_ca_system_score_gemma":0.000042368596,"threshold_uncertainty_score":0.76744556},"labels":[],"label_agreement":null},{"id":"W2110449433","doi":"10.1007/bf02480835","title":"International Conference on Performance of Construction Materials in the New Millennium (ICPCM)","year":2003,"lang":"en","type":"article","venue":"Materials and Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Stantec (Canada)","funders":"","keywords":"Solid mechanics; Engineering; Construction engineering; Forensic engineering; Engineering physics; Materials science; Composite material","score_opus":0.012065011124676858,"score_gpt":0.21059047905816966,"score_spread":0.1985254679334928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110449433","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9929568,0.000050180137,0.00004674964,0.00005853689,0.001672168,0.00008165145,0.000025747546,0.000017961342,0.0050901747],"genre_scores_gemma":[0.99903274,0.00038992384,0.0004279948,0.00002531696,0.000086381806,0.000006090061,0.000009106338,0.000005497449,0.000016942284],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99949867,0.00003919713,0.0002091348,0.00008323067,0.000091046815,0.00007873567],"domain_scores_gemma":[0.99983096,0.00000988225,0.000041710016,0.00008230664,0.000020663452,0.000014467307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009500909,0.00009252087,0.00012029377,0.00005728095,0.000026989244,0.00006747605,0.000071652976,0.000060326103,0.0008685556],"category_scores_gemma":[0.000008722773,0.00006306819,0.000009749447,0.00003923742,0.000049697144,0.00007356726,0.000004501272,0.00004375129,0.0000018960104],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005384971,0.0000037263262,0.00031345847,0.000051779905,0.000015242638,5.616283e-7,0.0004091922,0.0001296368,0.70260704,0.28959802,0.00043814306,0.0063793636],"study_design_scores_gemma":[0.0003551197,0.00004652175,0.011021665,0.00003708113,0.0000064185792,0.00006617725,0.0003799489,0.000076486394,0.9792804,0.005779843,0.002834381,0.000115921706],"about_ca_topic_score_codex":0.000023736637,"about_ca_topic_score_gemma":0.000005115912,"teacher_disagreement_score":0.28381816,"about_ca_system_score_codex":0.0000092332675,"about_ca_system_score_gemma":0.00001052472,"threshold_uncertainty_score":0.9510075},"labels":[],"label_agreement":null},{"id":"W2111346917","doi":"10.5555/1516744.1517176","title":"Simulation of modular building construction","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Modular construction; Process (computing); Construction management; Quality (philosophy); Software; Systems engineering; Software engineering; Engineering; Civil engineering; Operating system","score_opus":0.026359222299043944,"score_gpt":0.24473669673426554,"score_spread":0.2183774744352216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111346917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4235639,0.000021338921,0.5744074,0.000008089133,0.00035626814,0.000069117545,0.000003892878,0.00013745029,0.0014325574],"genre_scores_gemma":[0.99591804,0.000008363749,0.003908065,0.000010015609,0.0000791488,0.0000050003523,0.000010735835,0.000013591284,0.00004704824],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999249,0.000021234975,0.00032750564,0.00013647976,0.00015808514,0.0001076913],"domain_scores_gemma":[0.9993956,0.000081258906,0.00007187153,0.00015684648,0.0002574754,0.000036914138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000044695564,0.00011888679,0.00014253019,0.00013693378,0.00006287899,0.000015663885,0.000071347626,0.000089875415,0.00025778066],"category_scores_gemma":[0.00003900851,0.00012712556,0.00005536296,0.00016041387,0.000091736976,0.00033843712,0.000009818739,0.000099352976,0.000017179898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000088501465,0.0000053730405,0.0020711499,0.000015366162,0.000015213902,4.736464e-7,0.00025727687,0.973892,0.006048455,0.0033371514,0.000007986974,0.01434071],"study_design_scores_gemma":[0.00022185878,0.000017337463,0.0031749695,0.000033683405,0.000008378214,0.0000075361504,0.000049804446,0.986817,0.0077529326,0.0010279315,0.0007663013,0.00012226],"about_ca_topic_score_codex":0.000004705654,"about_ca_topic_score_gemma":0.000002223759,"teacher_disagreement_score":0.57235414,"about_ca_system_score_codex":0.000037601967,"about_ca_system_score_gemma":0.000020041822,"threshold_uncertainty_score":0.518403},"labels":[],"label_agreement":null},{"id":"W2112215065","doi":"10.1139/l08-072","title":"Impacts of automation technology on quality of project deliverables in the Taiwanese construction industry","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Council","keywords":"Deliverable; Automation; Quality (philosophy); Process management; Computer science; Systems engineering; Procurement; Project management; Correctness; Risk analysis (engineering); Operations management; Engineering management; Engineering; Business","score_opus":0.010910806690220728,"score_gpt":0.22533980027148004,"score_spread":0.2144289935812593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112215065","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963135,0.00030748633,0.002026705,0.00014720748,0.00024180175,0.00007127858,0.000006316989,0.000016620312,0.00086909736],"genre_scores_gemma":[0.99960774,0.000014892336,0.00032356798,0.0000088495735,0.000037186524,0.0000010498972,8.4210126e-7,0.000005079849,7.97457e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99930453,0.000020030559,0.00040798672,0.000038767692,0.00010790977,0.00012076499],"domain_scores_gemma":[0.99960786,0.000028907923,0.00012279226,0.00008944934,0.00010339237,0.000047625956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026949745,0.000079233716,0.00016449473,0.00076070323,0.000015737498,0.000010509562,0.00010888218,0.0001627215,0.00001652606],"category_scores_gemma":[0.00012730516,0.000066528184,0.00004105342,0.00047010544,0.000032692078,0.00013389229,8.7239334e-7,0.00038956435,1.9483393e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004221808,0.000039354876,0.038767062,0.00037465867,0.0001280981,0.00004233604,0.0035348262,0.77582985,0.053003926,0.061080318,0.00077886356,0.066378474],"study_design_scores_gemma":[0.0047958344,0.0019606084,0.73693824,0.004842799,0.00015631269,0.0032922742,0.015958633,0.11785347,0.09860377,0.010533287,0.003577188,0.0014875811],"about_ca_topic_score_codex":0.00047558892,"about_ca_topic_score_gemma":0.014193969,"teacher_disagreement_score":0.6981712,"about_ca_system_score_codex":0.000114964365,"about_ca_system_score_gemma":0.00019899243,"threshold_uncertainty_score":0.79205674},"labels":[],"label_agreement":null},{"id":"W2112272364","doi":"10.1061/(asce)0887-3801(2005)19:2(172)","title":"Building Integrated Architecture/Engineering/Construction Systems Using Smart Objects: Methodology and Implementation","year":2005,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Innovation Council; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Systems engineering; Building information modeling; Information model; Computer science; Integrated design; Engineering; System lifecycle; Architecture; Software engineering; Product lifecycle; New product development","score_opus":0.01613792735970042,"score_gpt":0.265734142334077,"score_spread":0.24959621497437656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112272364","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49203166,0.0008955263,0.5057921,0.0000080879745,0.0011260383,0.00005741362,8.425472e-7,0.000068003996,0.00002033221],"genre_scores_gemma":[0.76914674,0.000032307817,0.23038821,0.0000042827623,0.00039799066,0.000001258561,8.4213457e-7,0.00002792256,4.462948e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998637,0.000049374168,0.00074875966,0.00010907591,0.000159319,0.00029648017],"domain_scores_gemma":[0.999406,0.00018180537,0.00016807432,0.00007549473,0.00008233383,0.000086284934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007525291,0.00020895575,0.0003434777,0.0007560242,0.00003534058,0.00006971931,0.00008661318,0.00011261959,0.000005702765],"category_scores_gemma":[0.000082383885,0.00021466041,0.0000626771,0.0003782109,0.000016245582,0.0003194938,0.000019293939,0.0005178472,3.192512e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004259895,0.0000042349634,0.0014761359,0.00009135834,0.000052168132,0.0000027182036,0.0004280493,0.95233005,0.026304096,0.001314641,0.000008194611,0.01798408],"study_design_scores_gemma":[0.0004801785,0.000032624062,0.0021730943,0.0003771505,0.00002901641,0.0017980305,0.0004574183,0.98916215,0.0040773596,0.000027346856,0.0011649461,0.00022071216],"about_ca_topic_score_codex":0.000026316364,"about_ca_topic_score_gemma":0.000026223048,"teacher_disagreement_score":0.27711508,"about_ca_system_score_codex":0.00031685914,"about_ca_system_score_gemma":0.00003062412,"threshold_uncertainty_score":0.8753598},"labels":[],"label_agreement":null},{"id":"W2112414195","doi":"10.1061/9780784412329.129","title":"Integrated Building Information Model to Identify Possible Crane Instability Caused by Strong Winds","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Process (computing); Plan (archaeology); Selection (genetic algorithm); Systems engineering; Building information modeling; Computer science; Engineering; Risk analysis (engineering); Stability (learning theory); Construction engineering; Operations research; Operations management; Scheduling (production processes)","score_opus":0.04403308173752693,"score_gpt":0.3415100007979205,"score_spread":0.29747691906039353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112414195","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81486285,0.00039546378,0.17415564,0.00016766627,0.0029987982,0.0006828597,0.00022161314,0.00053259026,0.0059825224],"genre_scores_gemma":[0.9957376,0.000041499832,0.003485798,0.0000261615,0.00015643232,0.00015496735,0.00011669786,0.000029928491,0.00025088605],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99747795,0.00016680792,0.0005602768,0.00021974344,0.0007440346,0.0008311632],"domain_scores_gemma":[0.998096,0.000089901936,0.000066181565,0.00040517756,0.0008702659,0.0004725033],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011628045,0.00025034873,0.00024182526,0.00068648276,0.00035205443,0.00034066688,0.00026232013,0.00025722754,0.0005872944],"category_scores_gemma":[0.00022801693,0.00025304867,0.00007009062,0.00096112,0.00033520052,0.0044291914,0.00007897015,0.0007808183,0.00023329003],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022326289,0.00015626162,0.03782104,0.00042958785,0.00029709804,0.0000013699126,0.0023853206,0.022195566,0.15924238,0.07206635,0.10875456,0.5964272],"study_design_scores_gemma":[0.003924158,0.00021807506,0.02206475,0.00047482373,0.0001108581,0.00017361176,0.010415841,0.48803923,0.21074976,0.003820612,0.25749704,0.0025112268],"about_ca_topic_score_codex":0.00008883661,"about_ca_topic_score_gemma":0.00003898582,"teacher_disagreement_score":0.593916,"about_ca_system_score_codex":0.00049082335,"about_ca_system_score_gemma":0.00013035598,"threshold_uncertainty_score":0.9999922},"labels":[],"label_agreement":null},{"id":"W2112946342","doi":"10.1108/17538370910971063","title":"Building information modelling demystified: does it make business sense to adopt BIM?","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"BIM and Construction Integration","field":"Engineering","cited_by":260,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Originality; Business; Value (mathematics); Process (computing); Project management; Knowledge management; Marketing; Process management; Engineering; Management; Operations management; Computer science; Qualitative research; Sociology; Economics","score_opus":0.012686509838911607,"score_gpt":0.24049607770912104,"score_spread":0.22780956787020942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112946342","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24352953,0.00006321321,0.7457605,0.005199836,0.003894572,0.00014471165,0.0000045198417,0.000082460705,0.0013206828],"genre_scores_gemma":[0.97265226,0.00017183473,0.026146937,0.00052684546,0.00045639917,0.000004407423,0.000005680057,0.000014312251,0.00002132942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984876,0.000019842557,0.0006999016,0.00010681338,0.0004956016,0.00019026028],"domain_scores_gemma":[0.99835783,0.00003599895,0.00019743876,0.00010428576,0.0012518048,0.00005263126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034126447,0.00017526433,0.0001981165,0.0013309172,0.000040402243,0.00025499528,0.00029120385,0.00007886432,0.000010717104],"category_scores_gemma":[0.000107795975,0.00014899836,0.000048032383,0.0008062974,0.000016660835,0.0012551318,0.000028058561,0.00023868175,0.0000077479135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000861342,0.000020058264,0.00014359846,0.00004240251,0.000035850873,0.00004619665,0.00053764024,0.8486918,0.00048154788,0.005386259,0.00020984451,0.14431864],"study_design_scores_gemma":[0.0029957981,0.00007649256,0.024710162,0.004193059,0.00008408918,0.0018885322,0.0019766781,0.8798986,0.0047507896,0.019285629,0.05887011,0.0012700559],"about_ca_topic_score_codex":0.000048944148,"about_ca_topic_score_gemma":0.000024752588,"teacher_disagreement_score":0.72912276,"about_ca_system_score_codex":0.00023533136,"about_ca_system_score_gemma":0.0000661666,"threshold_uncertainty_score":0.60759765},"labels":[],"label_agreement":null},{"id":"W2113721707","doi":"10.1109/isuma.1993.366724","title":"Construction simulation and distribution fitting in a data deficient environment","year":2002,"lang":"en","type":"article","venue":"1993 (2nd) International Symposium on Uncertainty Modeling and Analysis","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Duration (music); Computer science; Distribution (mathematics); Artificial intelligence; Machine learning; Data mining; Mathematics","score_opus":0.021756484635682718,"score_gpt":0.23276987737803764,"score_spread":0.21101339274235492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113721707","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66490895,0.00027820197,0.33330423,0.00044667962,0.00020646855,0.00009421594,0.00019610014,0.000083118044,0.00048203414],"genre_scores_gemma":[0.99790204,0.0006603756,0.00042118604,0.000026146583,0.000068716436,0.0000107414835,0.00087229535,0.000009113792,0.00002941251],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885255,0.000029156423,0.00035899662,0.00036356182,0.00025356523,0.00014216281],"domain_scores_gemma":[0.99958515,0.000057567933,0.000059818696,0.00020387092,0.000040921313,0.000052675587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018734067,0.0001530136,0.00017104759,0.00020738413,0.00010198303,0.00009462837,0.00010750095,0.00008205299,0.000085483145],"category_scores_gemma":[0.00002386195,0.0001531535,0.000050028968,0.00022929547,0.000041559746,0.00022342836,0.000042576085,0.00014991144,0.000004455831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009945454,0.000022414251,0.0037266284,0.0000068033805,0.00013625908,6.1366046e-7,0.00012235645,0.9784449,0.00014745326,0.0011278556,0.00001095,0.016243845],"study_design_scores_gemma":[0.00027654096,0.000011542135,0.00031551835,0.000027394031,0.00013145707,0.0000044815138,0.00017861978,0.99798125,0.000018184086,0.00023905956,0.0006644556,0.00015147495],"about_ca_topic_score_codex":0.00023994234,"about_ca_topic_score_gemma":0.00008681155,"teacher_disagreement_score":0.33299306,"about_ca_system_score_codex":0.0001752076,"about_ca_system_score_gemma":0.0000026128623,"threshold_uncertainty_score":0.6245418},"labels":[],"label_agreement":null},{"id":"W2115163594","doi":"10.1186/2213-7459-1-9","title":"Review and analysis of augmented reality literature for construction industry","year":2013,"lang":"en","type":"article","venue":"Visualization in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":178,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Augmented reality; Maturity (psychological); Schedule; Virtual reality; Field (mathematics); Building information modeling; Engineering management; Engineering; Computer science; Operations management; Human–computer interaction; Political science","score_opus":0.009240237484538819,"score_gpt":0.2582947414295159,"score_spread":0.2490545039449771,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115163594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14513718,0.013304494,0.8394674,0.00009435782,0.00040858952,0.0009476017,0.00007881038,0.0003134071,0.00024817517],"genre_scores_gemma":[0.99441034,0.0026186528,0.0024432624,0.000048287675,0.0000279865,0.00017904806,0.0002373187,0.000019189347,0.00001590441],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995004,0.000008930684,0.00027734396,0.00009060832,0.000045385186,0.00007733708],"domain_scores_gemma":[0.999738,0.00002190872,0.000037256203,0.00007709741,0.00009909004,0.000026685757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007486793,0.00008371146,0.0001911685,0.00034688963,0.000011028804,0.000019486466,0.000026194595,0.00012609515,0.000046040164],"category_scores_gemma":[0.00004037856,0.00008738491,0.000029929264,0.0011367175,0.000011775773,0.00018244938,0.0000043496393,0.000086957334,3.0371396e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000130558265,0.00007884792,0.061968442,0.024716167,0.0019695628,6.917534e-7,0.0013278436,0.63916904,0.04897671,0.13038802,0.004529868,0.08686175],"study_design_scores_gemma":[0.00024216397,0.0000146862085,0.02462237,0.0008533872,0.00034763687,0.0000053424383,0.000054327396,0.96938974,0.0027424465,0.0001320103,0.0014058532,0.00019001671],"about_ca_topic_score_codex":0.000009033621,"about_ca_topic_score_gemma":0.0000027323406,"teacher_disagreement_score":0.84927315,"about_ca_system_score_codex":0.000028988557,"about_ca_system_score_gemma":0.0000038786397,"threshold_uncertainty_score":0.35634533},"labels":[],"label_agreement":null},{"id":"W2115467569","doi":"10.5555/2433508.2433888","title":"An HLA-based bidding game with intelligent virtual player","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; High-level architecture; Architecture; Process (computing); Game theory; Virtual machine; Fuzzy logic; Software engineering; Operating system; Artificial intelligence","score_opus":0.005722538136415866,"score_gpt":0.20178767298202124,"score_spread":0.19606513484560537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115467569","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69723964,0.0000028659872,0.29528508,0.000020401407,0.00042946025,0.000040551706,0.000001280002,0.0003177043,0.0066630114],"genre_scores_gemma":[0.99620897,5.8793523e-7,0.0034782453,0.000052648415,0.000090425034,0.000008764334,0.0000055858436,0.000014022493,0.00014073275],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967206,0.0000037469586,0.000079583246,0.000081409795,0.00007256205,0.00009062844],"domain_scores_gemma":[0.99977916,0.000010285522,0.000007863413,0.00012495651,0.000023415154,0.000054325385],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000032294985,0.00007439635,0.000050679915,0.00005835337,0.00002191536,0.000039186034,0.000052824747,0.000054212327,0.0010509648],"category_scores_gemma":[0.0000024487279,0.000055595614,0.000015224877,0.0000731973,0.000023186125,0.00011320224,0.0000017866842,0.00015363496,0.000065824795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054454533,0.0000658561,0.0063570235,0.000019262343,0.00005485427,0.000005542188,0.0004870314,0.10982198,0.3310784,0.11724404,0.000797389,0.43401414],"study_design_scores_gemma":[0.00027135471,0.00014674528,0.0014130685,0.000012544076,0.000010448553,0.000027399423,0.0004020461,0.6185122,0.36675534,0.00012476965,0.012055564,0.0002684766],"about_ca_topic_score_codex":0.000014214289,"about_ca_topic_score_gemma":0.0002941288,"teacher_disagreement_score":0.50869024,"about_ca_system_score_codex":0.000011159324,"about_ca_system_score_gemma":0.0000109694565,"threshold_uncertainty_score":0.9998622},"labels":[],"label_agreement":null},{"id":"W2116340790","doi":"10.1061/41109(373)3","title":"Resource Performance Indicators in Controlling Industrial Steel Projects","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Resource (disambiguation); Systems engineering; Performance indicator; Computer science; Control (management); Process (computing); Markov chain; Engineering; Industrial engineering; Business","score_opus":0.011304692620435033,"score_gpt":0.19197177816869937,"score_spread":0.18066708554826433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116340790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9369307,0.000007910861,0.00014290592,0.00002849228,0.0004882284,0.00010735012,5.8871336e-7,0.00011558837,0.062178228],"genre_scores_gemma":[0.99926263,0.000002732729,0.00016007196,0.00001855643,0.00017590066,0.000013862834,0.0000016706829,0.000008018619,0.00035655577],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999604,0.0000062339163,0.00013575218,0.000070911556,0.00007103493,0.000112073925],"domain_scores_gemma":[0.99985677,0.000015363257,0.000014027825,0.000078563324,0.0000073989354,0.000027850774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000098462995,0.00006284845,0.000070155555,0.00023075195,0.000021469805,0.000021001284,0.000055420103,0.00012646377,0.00014031882],"category_scores_gemma":[0.000014770523,0.000054913708,0.0000143548,0.00027928984,0.000019737581,0.000102926046,0.0000047086705,0.0003960486,0.00003043122],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008353081,0.000037965445,0.2693507,0.000040436465,0.000036279926,0.000003089723,0.0010104551,0.005926326,0.046349738,0.027547428,0.0030847231,0.6465293],"study_design_scores_gemma":[0.0075825723,0.0001460912,0.046382487,0.000119480246,0.000025324824,0.000053122414,0.0018757788,0.4745834,0.14340265,0.00018167461,0.3245841,0.0010633109],"about_ca_topic_score_codex":0.0000056685703,"about_ca_topic_score_gemma":0.00005520699,"teacher_disagreement_score":0.645466,"about_ca_system_score_codex":0.000015734815,"about_ca_system_score_gemma":0.000018754661,"threshold_uncertainty_score":0.22393161},"labels":[],"label_agreement":null},{"id":"W2118371895","doi":"10.1061/9780784479070.039","title":"Overview of Building Information Modeling Applications in Construction Projects","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Building information modeling; Construction engineering; Systems engineering; Data science; Engineering","score_opus":0.0406964215009775,"score_gpt":0.2561759752365242,"score_spread":0.2154795537355467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118371895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2066848,0.00017891539,0.77739763,0.000012672239,0.00015359426,0.00020785881,0.0000022742063,0.00014263361,0.015219606],"genre_scores_gemma":[0.98551786,0.000035582514,0.01436885,0.000005937965,0.000014967483,0.000040593477,0.000009682064,0.0000033088122,0.0000032250582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996061,0.0000053736817,0.00022027818,0.00003603234,0.00007588723,0.000056359644],"domain_scores_gemma":[0.9998011,0.0000048371608,0.000023611667,0.000067892055,0.00008017643,0.00002239954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000072630275,0.000048415495,0.0000668803,0.00014634017,0.000010048495,0.000011982916,0.000032514192,0.000042530395,0.0000081739],"category_scores_gemma":[0.000008662289,0.00004616881,0.0000145416125,0.00024935266,0.00001092316,0.0004949245,0.00000504547,0.00005236629,0.0000044437534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058077785,0.000011044293,0.004162919,0.00018915725,0.000012445474,4.0998902e-8,0.0009996302,0.4477429,0.0010562888,0.418597,0.00011177082,0.12711097],"study_design_scores_gemma":[0.00021365573,0.0000064054652,0.00007239088,0.000029653513,0.0000040163986,0.000005915628,0.0019435934,0.98843515,0.0032327657,0.004828736,0.001152132,0.00007561021],"about_ca_topic_score_codex":0.00005747095,"about_ca_topic_score_gemma":0.000020310796,"teacher_disagreement_score":0.77883303,"about_ca_system_score_codex":0.0000511396,"about_ca_system_score_gemma":0.000025427951,"threshold_uncertainty_score":0.18827094},"labels":[],"label_agreement":null},{"id":"W2120078372","doi":"","title":"A Review of Quantitative Approaches to Intelligent Building Assessment","year":2006,"lang":"en","type":"review","venue":"OakTrust (Texas A&M University Libraries)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Christian ministry; Architecture; Strengths and weaknesses; China; Engineering; Process (computing); Architectural engineering; Engineering management; Construction engineering; Computer science; Geography; Political science","score_opus":0.10458108242602554,"score_gpt":0.2744937573972693,"score_spread":0.16991267497124374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120078372","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000014480426,0.925847,0.034043513,0.00003862092,0.0003576777,0.00073955645,0.00015371227,0.00018222173,0.03863625],"genre_scores_gemma":[0.0000062056397,0.9780762,0.020869415,0.00002909237,0.000059975653,0.000005890632,0.00022218142,0.000050185165,0.0006808062],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99845624,0.0001430279,0.0005616347,0.00036682107,0.00022054008,0.00025174487],"domain_scores_gemma":[0.9990553,0.00012701131,0.00023891362,0.00039563002,0.000058750345,0.0001243515],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015506317,0.0004370754,0.0013286063,0.00046528268,0.00008296092,0.000057343143,0.00048631182,0.00026531084,0.00028456456],"category_scores_gemma":[0.000019107541,0.00043631138,0.00045240956,0.0010733092,0.00010448684,0.00039886805,0.00015201054,0.0004377922,0.00005839479],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035788244,0.000026902171,0.000004723538,0.07076553,0.000255936,0.000005615582,0.000033024255,0.00012973572,2.0295079e-7,0.3562038,0.009952117,0.56261885],"study_design_scores_gemma":[0.000055051503,0.000036738606,0.0000028878096,0.040536582,0.00049098826,0.000006945667,0.000100013196,0.00017345649,0.000007542238,0.00012088901,0.9580889,0.00038000263],"about_ca_topic_score_codex":0.000032216376,"about_ca_topic_score_gemma":0.000008570183,"teacher_disagreement_score":0.9481368,"about_ca_system_score_codex":0.00033057446,"about_ca_system_score_gemma":0.00028234257,"threshold_uncertainty_score":0.99980885},"labels":[],"label_agreement":null},{"id":"W2122351176","doi":"10.1061/(asce)0733-9364(2005)131:2(168)","title":"Graphical Approach for Manpower Planning in Infrastructure Networks","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Scheduling (production processes); Operations research; Engineering; Operations management","score_opus":0.0034224390620060416,"score_gpt":0.18411934413907768,"score_spread":0.18069690507707165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122351176","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049031053,0.00074549293,0.9485288,0.000037803307,0.0007079931,0.00011578401,7.7830873e-7,0.000049350812,0.0007829262],"genre_scores_gemma":[0.89641994,0.0003583312,0.102901384,0.000015029823,0.00026734444,0.000011056728,0.000001765235,0.000013040866,0.000012091979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994114,0.0000046574432,0.00030309212,0.00007094855,0.00008367452,0.000126212],"domain_scores_gemma":[0.9998083,0.000012667495,0.000050910105,0.000049073034,0.00003158885,0.000047437064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012296872,0.000104836705,0.00014291274,0.00032691268,0.00002250915,0.000031526208,0.000048317448,0.00007129173,0.0000050058698],"category_scores_gemma":[0.0000038111061,0.00009897164,0.000049293365,0.00013719378,0.000019850564,0.00016929573,0.0000073672313,0.00019437718,9.458099e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013811678,0.000004672628,0.00041123683,0.00007183853,0.000056026813,0.0000019439938,0.000042170384,0.92205805,0.00007476958,0.009662397,0.0004084273,0.06719466],"study_design_scores_gemma":[0.00096788,0.0000331203,0.0050373315,0.00009425113,0.000040568168,0.00042986494,0.00030890992,0.96743244,0.000082396764,0.00021170932,0.02519071,0.00017080775],"about_ca_topic_score_codex":1.491021e-7,"about_ca_topic_score_gemma":1.6268825e-7,"teacher_disagreement_score":0.8473889,"about_ca_system_score_codex":0.000045414938,"about_ca_system_score_gemma":0.0000030579913,"threshold_uncertainty_score":0.40359464},"labels":[],"label_agreement":null},{"id":"W2123303660","doi":"10.1061/9780784412329.249","title":"Improving Concrete Trade Labor Productivity through the Use of Innovations","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Formwork; Productivity; Schedule; Modular design; Engineering; Construction industry; Unit (ring theory); Civil engineering; Computer science; Construction engineering; Economics; Mathematics","score_opus":0.08499638239499882,"score_gpt":0.3161857194941928,"score_spread":0.23118933709919395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123303660","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9586752,0.0029693071,0.021852614,0.0020955775,0.008521333,0.0013578263,0.00020767229,0.000495629,0.0038248294],"genre_scores_gemma":[0.99513817,0.00009486883,0.0037854183,0.00002364276,0.0005092253,0.000108583015,0.000014124367,0.000027846121,0.0002981462],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982822,0.00023684504,0.0003669711,0.00017115881,0.00046879813,0.00047405928],"domain_scores_gemma":[0.9985544,0.00030682757,0.00009335558,0.00044017303,0.00052359427,0.00008162046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006539583,0.00014797707,0.00017375931,0.00019717358,0.00030892357,0.00009807982,0.00017170087,0.00013178083,0.00023896624],"category_scores_gemma":[0.00041660966,0.000116054565,0.000054261207,0.0010213843,0.0010440171,0.0021433234,0.000048220867,0.00062312523,0.000023037157],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006997427,0.000036875168,0.027175406,0.0002747586,0.00025429585,9.76255e-7,0.0017437377,0.00051019737,0.11676402,0.43963328,0.033114128,0.38042235],"study_design_scores_gemma":[0.00084089104,0.00007107528,0.018957727,0.0001067764,0.00006445767,0.00023764074,0.002722675,0.0069693993,0.16567425,0.0014422691,0.80234057,0.0005722584],"about_ca_topic_score_codex":0.000104271516,"about_ca_topic_score_gemma":0.000021824831,"teacher_disagreement_score":0.76922643,"about_ca_system_score_codex":0.000083793355,"about_ca_system_score_gemma":0.000087417844,"threshold_uncertainty_score":0.4732568},"labels":[],"label_agreement":null},{"id":"W2123593214","doi":"10.5555/1351542.1351906","title":"Agent-based simulation for collaborative cranes","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Kinematics; Computer science; Motion planning; Control (management); Action (physics); Control engineering; Simulation; Systems engineering; Distributed computing; Engineering; Artificial intelligence; Robot","score_opus":0.03286624200636735,"score_gpt":0.2850389930759678,"score_spread":0.25217275106960046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123593214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035824493,0.000029972165,0.95939136,0.000047913723,0.00069027353,0.0003824585,0.00002189738,0.00026731804,0.0033443442],"genre_scores_gemma":[0.9967017,8.5719336e-7,0.0028110386,0.00008040659,0.0001395425,0.000026380047,0.00005900377,0.000017718585,0.00016334177],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992706,0.000013920942,0.0002870269,0.0001508239,0.00011966333,0.00015796974],"domain_scores_gemma":[0.99901426,0.00030396495,0.00005319674,0.00012279666,0.00045571203,0.000050078605],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013492715,0.00013244626,0.00011136061,0.0001228659,0.00007332446,0.00006786572,0.00006629077,0.00009547546,0.0002075314],"category_scores_gemma":[0.000052616324,0.00013527034,0.00005244286,0.00017767149,0.00003266727,0.00021655484,0.0000039275733,0.00006802703,0.000027932767],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089970876,0.000008333888,0.00036829637,0.000022225124,0.000014715574,3.068749e-7,0.0002836787,0.958637,0.0010784161,0.002316877,0.000080829086,0.037099365],"study_design_scores_gemma":[0.00079769955,0.00003727854,0.0013966217,0.000025667336,0.000012401184,2.4498314e-7,0.00017016538,0.977875,0.0049885632,0.0005127096,0.014029043,0.00015458655],"about_ca_topic_score_codex":0.000001652846,"about_ca_topic_score_gemma":0.00004384295,"teacher_disagreement_score":0.96087724,"about_ca_system_score_codex":0.000059667116,"about_ca_system_score_gemma":0.000029874427,"threshold_uncertainty_score":0.55161643},"labels":[],"label_agreement":null},{"id":"W2124910353","doi":"10.5555/564124.564352","title":"On the use of fuzzy clustering in construction simulation","year":2001,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cluster analysis; Computer science; Fuzzy clustering; Fuzzy logic; Discrete event simulation; Data mining; Fuzzy set; Simulation; Artificial intelligence","score_opus":0.062464998529263016,"score_gpt":0.2579908976892235,"score_spread":0.1955258991599605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124910353","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5674796,0.0000053903195,0.4294014,0.00007532093,0.00037236922,0.00014944216,0.0000033224514,0.000078441735,0.002434723],"genre_scores_gemma":[0.9994265,0.0000070487067,0.00040232803,0.000048534243,0.000035479807,0.000008326466,0.0000061965266,0.000010012571,0.00005560467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993191,0.000041035186,0.0003000364,0.00011522928,0.0001240804,0.000100541874],"domain_scores_gemma":[0.9993333,0.00031057146,0.000058281374,0.00016863471,0.000109887915,0.000019296442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000065534536,0.000104873834,0.000103279504,0.00013898443,0.000032847456,0.000050885854,0.00006498368,0.000070345166,0.0002647451],"category_scores_gemma":[0.000072516974,0.000086936794,0.000034714994,0.00020145605,0.000049576323,0.00031219813,0.000010129385,0.0001312774,0.000017882521],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030222734,0.0000062437925,0.0026479925,0.0000063762814,0.0000063153316,3.70474e-7,0.00021449407,0.9564514,0.00035320196,0.008042493,0.000014175326,0.032226726],"study_design_scores_gemma":[0.00019199624,0.000018537628,0.0053268434,0.00007770587,0.0000037727898,0.00000237724,0.00008014206,0.9910838,0.00029217257,0.0016763946,0.001159939,0.000086332824],"about_ca_topic_score_codex":0.000014918707,"about_ca_topic_score_gemma":0.00009132269,"teacher_disagreement_score":0.43194687,"about_ca_system_score_codex":0.00004703599,"about_ca_system_score_gemma":0.000009704926,"threshold_uncertainty_score":0.35451797},"labels":[],"label_agreement":null},{"id":"W2124960278","doi":"10.1109/ifsa-nafips.2013.6608554","title":"Developing a fuzzy discrete event simulation framework within a traditional simulation engine","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Fuzzy logic; Computer science; Event (particle physics); Variable (mathematics); Fuzzy set; Simulation modeling; Artificial intelligence; Simulation; Mathematics","score_opus":0.023000583797560092,"score_gpt":0.24691504052437674,"score_spread":0.22391445672681665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124960278","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10789024,0.00002736407,0.8887326,0.00017456843,0.00050945504,0.0002036286,0.0000034593372,0.00039258378,0.002066056],"genre_scores_gemma":[0.96307665,0.000002667685,0.0364152,0.00008510066,0.0002105635,0.00005576812,0.00004366555,0.000019502959,0.000090883594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992638,0.000014644219,0.0002863506,0.00012803178,0.00017217878,0.00013496343],"domain_scores_gemma":[0.9995953,0.00013211447,0.000033518652,0.00010137213,0.0000856161,0.000052087227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000055946588,0.00013178858,0.00009652953,0.00009333869,0.0000723379,0.00007101018,0.000049551676,0.000118070086,0.00073248346],"category_scores_gemma":[0.00004066916,0.00012033301,0.000046114637,0.00018906011,0.000016511049,0.00044995663,0.0000056259873,0.00015444047,0.000170904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019253084,0.0000034422205,0.00012392913,0.000011966592,0.000016761596,1.3201921e-7,0.00015136077,0.9193419,0.00014722184,0.069055125,0.00005129005,0.01109492],"study_design_scores_gemma":[0.00011019473,0.000010736805,0.004222513,0.00004360002,0.000006377979,0.0000021659173,0.00008413342,0.9358996,0.0004642857,0.05863804,0.00035263313,0.00016572035],"about_ca_topic_score_codex":0.000011222972,"about_ca_topic_score_gemma":0.000006247614,"teacher_disagreement_score":0.8551864,"about_ca_system_score_codex":0.00011189572,"about_ca_system_score_gemma":0.000019534253,"threshold_uncertainty_score":0.80201805},"labels":[],"label_agreement":null},{"id":"W2125053417","doi":"10.1061/9780784412329.128","title":"Integrated BIM/Lean Base Production Line Schedule Model for Modular Construction Manufacturing","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Modular design; Schedule; Factory (object-oriented programming); Value stream mapping; Manufacturing engineering; Process (computing); Lean manufacturing; Building information modeling; Engineering; Systems engineering; Production line; Computer science; Industrial engineering; Scheduling (production processes); Operations management; Mechanical engineering","score_opus":0.06540056605725332,"score_gpt":0.3119252680356477,"score_spread":0.24652470197839438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125053417","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65435696,0.0011905683,0.32963833,0.0003083306,0.01068705,0.0014311749,0.00012873864,0.0009727657,0.0012860893],"genre_scores_gemma":[0.9535231,0.00022680948,0.04292495,0.000015418953,0.0014703902,0.00049076776,0.00015894021,0.000099459765,0.0010901465],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99705464,0.0001403328,0.00061626255,0.0004976247,0.00063999655,0.0010511429],"domain_scores_gemma":[0.9978119,0.000115817675,0.0001150228,0.0005568304,0.0009975573,0.0004028343],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012927846,0.00038562715,0.00034973564,0.0008689213,0.0006014485,0.00016767034,0.00023908001,0.00037564064,0.0003783205],"category_scores_gemma":[0.00029241538,0.00038574572,0.00015636491,0.0005565453,0.00074870366,0.0019893257,0.000056442877,0.00092557934,0.00011343241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004227264,0.00022413158,0.0039048311,0.0007228653,0.00044277622,0.0000024910269,0.00060304406,0.07453254,0.08777184,0.11446562,0.011406113,0.705501],"study_design_scores_gemma":[0.00120045,0.000075645454,0.00024922573,0.0001679565,0.00007318644,0.00033854524,0.0021067732,0.6396359,0.32612857,0.0077903424,0.021495555,0.0007378058],"about_ca_topic_score_codex":0.000019962174,"about_ca_topic_score_gemma":0.000033880213,"teacher_disagreement_score":0.70476323,"about_ca_system_score_codex":0.00040559398,"about_ca_system_score_gemma":0.00014171879,"threshold_uncertainty_score":0.99985945},"labels":[],"label_agreement":null},{"id":"W2127202902","doi":"10.1061/9780784412329.079","title":"Rethinking the Cost Estimating Process through 5D BIM: A Case Study","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Building information modeling; Workflow; Predictability; Computer science; Process (computing); Software; Cost estimate; Systems engineering; Work (physics); Process management; Software engineering; Risk analysis (engineering); Engineering; Operations management; Scheduling (production processes); Business; Database","score_opus":0.11367742315030975,"score_gpt":0.38238080314851874,"score_spread":0.268703379998209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127202902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96077484,0.0011901087,0.023432847,0.00017850695,0.006766362,0.0015837554,0.000015317597,0.0005163176,0.0055419314],"genre_scores_gemma":[0.9950666,0.000021578668,0.0033503768,0.000017675411,0.0008934613,0.00044648538,0.0000055506675,0.000041895557,0.0001564099],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9975173,0.0003811722,0.00040546514,0.00024695514,0.00072355464,0.00072558114],"domain_scores_gemma":[0.998351,0.00034752503,0.000077114055,0.0004554693,0.0006036419,0.00016528212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017113226,0.00021853246,0.00019967442,0.00020247482,0.0010513508,0.00027872564,0.00026030975,0.0001478508,0.0005245648],"category_scores_gemma":[0.00025496644,0.00016647519,0.00005608545,0.00078972435,0.00061286933,0.0015469794,0.00007318758,0.0011102416,0.00011248924],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009284821,0.0004072334,0.113373265,0.0005030777,0.0006464578,0.00043204025,0.0557269,0.007962846,0.0006773644,0.06793032,0.011509194,0.74073845],"study_design_scores_gemma":[0.005784876,0.00048660568,0.005168442,0.0008175488,0.00040884662,0.05707695,0.48611742,0.3475072,0.0073765647,0.02734878,0.058926914,0.0029798448],"about_ca_topic_score_codex":0.00019851293,"about_ca_topic_score_gemma":0.00015286279,"teacher_disagreement_score":0.73775864,"about_ca_system_score_codex":0.00014668939,"about_ca_system_score_gemma":0.0000831377,"threshold_uncertainty_score":0.8086247},"labels":[],"label_agreement":null},{"id":"W2127396715","doi":"10.1061/(asce)0733-9364(2003)129:4(396)","title":"Genetic Optimization for Dynamic Project Control","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Schedule; Computer science; Earned value management; Cash flow; Scheduling (production processes); Resource leveling; Genetic algorithm; Project management; Operations research; Project planning; Industrial engineering; Mathematical optimization; Systems engineering; Engineering; Operations management","score_opus":0.002866054542077819,"score_gpt":0.17880501614989378,"score_spread":0.17593896160781597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127396715","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014420343,0.0004966564,0.98329884,0.000015788442,0.0011426636,0.00018491954,0.0000019674437,0.000050221282,0.00038861003],"genre_scores_gemma":[0.72589964,0.0008667683,0.27309746,0.000009387525,0.000055771194,0.000022717128,7.593353e-7,0.000017399952,0.00003009569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953353,0.0000073230012,0.00024446702,0.000054573426,0.00007231257,0.00008778679],"domain_scores_gemma":[0.9997884,0.000013493465,0.000058411424,0.00004589885,0.000063919586,0.000029899453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000094033276,0.000084579406,0.0001105007,0.00021170893,0.00002867127,0.00003106359,0.000027207614,0.000035086072,0.000008424114],"category_scores_gemma":[0.000010717903,0.00008160136,0.000044826902,0.000088068235,0.0000135657065,0.0001037992,0.0000015888052,0.000059573293,2.3217213e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008377079,0.0000042480833,0.00005701416,0.00014042547,0.00012431278,0.0000016955398,0.000018940918,0.95035356,0.00020620736,0.011445179,0.00013251478,0.03750753],"study_design_scores_gemma":[0.0014531754,0.00006919279,0.00035042208,0.000064500426,0.00012949467,0.000601225,0.00019562605,0.9638563,0.00016142837,0.00027299015,0.032688763,0.0001568818],"about_ca_topic_score_codex":1.5899911e-7,"about_ca_topic_score_gemma":1.8659702e-7,"teacher_disagreement_score":0.7114793,"about_ca_system_score_codex":0.00003948023,"about_ca_system_score_gemma":0.000008032117,"threshold_uncertainty_score":0.3327607},"labels":[],"label_agreement":null},{"id":"W2129112673","doi":"10.5555/1351542.1351865","title":"A simulation-based framework for quantifying the cold regions weather impacts on construction schedules","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Baseline (sea); Schedule; Cold weather; Computer science; Scheduling (production processes); Operations research; Meteorology; Engineering; Operations management; Geography","score_opus":0.058261378241718266,"score_gpt":0.3153611289114695,"score_spread":0.2570997506697512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129112673","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048724636,0.000031370917,0.94867676,0.00029487698,0.00090399873,0.0004295954,0.00001478536,0.0002883665,0.00063559314],"genre_scores_gemma":[0.9849868,0.0000018616705,0.014432842,0.00023526615,0.00023788965,0.00003056518,0.00001647553,0.000029198653,0.000029129977],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901026,0.000028936789,0.00034223267,0.00020361695,0.00018112562,0.00023381482],"domain_scores_gemma":[0.99725205,0.002022041,0.00009932853,0.00028093628,0.0002801191,0.000065547785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022854631,0.00018946585,0.00013821488,0.00014774427,0.00022442914,0.0001358619,0.000120914636,0.00017456253,0.00012227595],"category_scores_gemma":[0.00033890232,0.0001528813,0.00010173245,0.00021041758,0.00009596525,0.00017902332,0.000006265949,0.00023394212,0.000029818353],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056774006,0.000009783392,0.0009018866,0.000016688971,0.000021077693,1.900885e-7,0.00016767424,0.75512356,0.00039679545,0.23556024,0.0000138244695,0.007731518],"study_design_scores_gemma":[0.00036378772,0.000049721137,0.0012294088,0.00017493316,0.000021558231,7.1169126e-7,0.00031184615,0.9827704,0.0028107837,0.008581241,0.0034976427,0.000188012],"about_ca_topic_score_codex":0.000004346898,"about_ca_topic_score_gemma":0.00004438365,"teacher_disagreement_score":0.93626213,"about_ca_system_score_codex":0.00008562945,"about_ca_system_score_gemma":0.000040515486,"threshold_uncertainty_score":0.62343186},"labels":[],"label_agreement":null},{"id":"W2129994225","doi":"10.5555/2675983.2676380","title":"Assessment of construction operations productivity rate as computed by simulation models","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Discrete event simulation; Credibility; Productivity; Duration (music); Simulation modeling; Process (computing); Computer science; Industrial engineering; Simulation; Operations research; Engineering; Mathematics","score_opus":0.02129100070408434,"score_gpt":0.2661875941416046,"score_spread":0.24489659343752024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129994225","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3158692,0.000011285862,0.67990583,0.00007393558,0.00037409965,0.00034665153,0.000014729135,0.00016792708,0.0032363227],"genre_scores_gemma":[0.9954182,0.000003930268,0.0041904855,0.000025581683,0.000058334994,0.000046220946,0.000094665425,0.000016723809,0.00014587595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989575,0.000077602606,0.00042231593,0.0002313001,0.00017627752,0.00013497117],"domain_scores_gemma":[0.9989145,0.00008063149,0.00007518392,0.0002260353,0.0006472204,0.000056443936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009869069,0.00016930874,0.00018842074,0.00011706532,0.00008093475,0.00011628905,0.00009173484,0.00010131416,0.0006228008],"category_scores_gemma":[0.00002513116,0.00017286128,0.000048116148,0.00019170904,0.00008223919,0.0011379704,0.000017109474,0.00015120243,0.000035620775],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029623864,0.000021354896,0.00047778065,0.000018026778,0.00002675026,4.4455497e-8,0.00013250082,0.96085334,0.013928934,0.009900343,0.000076079275,0.014561871],"study_design_scores_gemma":[0.00027433375,0.00003307869,0.0039695916,0.000031720738,0.000013336161,0.0000016578435,0.00008121454,0.987785,0.0039384644,0.003525713,0.00017929985,0.00016661813],"about_ca_topic_score_codex":0.00006623692,"about_ca_topic_score_gemma":0.000015719474,"teacher_disagreement_score":0.679549,"about_ca_system_score_codex":0.000070862836,"about_ca_system_score_gemma":0.00005271713,"threshold_uncertainty_score":0.70490783},"labels":[],"label_agreement":null},{"id":"W2130363290","doi":"10.1109/citcon.1988.13243","title":"Computerized production planning and energy management","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"St. Lawrence College","funders":"","keywords":"Production (economics); Energy management; Initialization; Computer science; Function (biology); Cost reduction; Production planning; Energy (signal processing); Control (management); Operations research; Operations management; Engineering management; Manufacturing engineering; Systems engineering; Engineering; Business; Artificial intelligence; Economics; Mathematics","score_opus":0.006544199207077037,"score_gpt":0.17861581411276,"score_spread":0.17207161490568296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130363290","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06774657,0.00039638975,0.66606545,0.000043590975,0.0015071611,0.000044391618,1.8779868e-7,0.00047416732,0.26372206],"genre_scores_gemma":[0.9886455,0.00004302595,0.009701254,0.000022145583,0.000028406563,0.00000739611,0.0000012261129,0.0000045710885,0.0015464707],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99982834,0.000004576339,0.000046593086,0.00005329031,0.000025474827,0.000041746727],"domain_scores_gemma":[0.9999406,0.0000014047206,0.000003666637,0.000036994395,0.00000527538,0.000012105664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000017902299,0.00003485935,0.000028136972,0.000030154364,0.000021164997,0.000014028112,0.000008583141,0.00001345073,0.000030112002],"category_scores_gemma":[5.5506604e-7,0.000032019598,0.000005265057,0.00003868505,0.000006078622,0.000046654768,0.0000019724087,0.000015961197,0.000002149475],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036854608,0.0000068885197,0.0006998751,0.000041104922,0.000053358086,0.0000023550876,0.00009944329,0.006829962,0.00400604,0.69438326,0.00717462,0.28669938],"study_design_scores_gemma":[0.0008490901,0.000034002554,0.0057474403,0.000063342275,0.000031059204,0.00019732954,0.0006634684,0.068189695,0.05888105,0.006197631,0.8586432,0.0005027314],"about_ca_topic_score_codex":0.0000010889909,"about_ca_topic_score_gemma":7.7514045e-7,"teacher_disagreement_score":0.9208989,"about_ca_system_score_codex":0.000006685258,"about_ca_system_score_gemma":5.9884707e-7,"threshold_uncertainty_score":0.13057213},"labels":[],"label_agreement":null},{"id":"W2130488785","doi":"10.1061/41020(339)75","title":"A Prediction Model for Construction Project Time Contingency","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Contingency","score_opus":0.04671138233417803,"score_gpt":0.3137268235767139,"score_spread":0.26701544124253584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130488785","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1771253,0.002170046,0.6889221,0.0015891411,0.009826057,0.008662084,0.0014150448,0.0057547963,0.1045354],"genre_scores_gemma":[0.92279065,0.00075467903,0.065392874,0.000106926236,0.0016803243,0.00095193455,0.00035652117,0.00013384428,0.007832242],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99767506,0.000106490974,0.0005644849,0.000452698,0.000561723,0.00063954777],"domain_scores_gemma":[0.99822396,0.00010141641,0.00008632073,0.00035116822,0.0010892889,0.00014784635],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00067036005,0.00027090157,0.00029430195,0.0007255992,0.0004733126,0.00021567219,0.00020935075,0.00031146526,0.00014177797],"category_scores_gemma":[0.00019400335,0.00028443962,0.00011931931,0.0006941613,0.0004369768,0.0006399675,0.000016138485,0.00052832684,0.00006765201],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019841321,0.00005610055,0.00028612657,0.00009179613,0.000090684276,0.0000027123856,0.00024529337,0.006160788,0.038207803,0.0552116,0.055660486,0.8437882],"study_design_scores_gemma":[0.0013270857,0.00027672347,0.00019718638,0.00009945177,0.00003693409,0.00022591192,0.0003524613,0.9354481,0.012978154,0.026896058,0.021764599,0.0003973499],"about_ca_topic_score_codex":0.00000556638,"about_ca_topic_score_gemma":0.0000064269507,"teacher_disagreement_score":0.9292873,"about_ca_system_score_codex":0.00022454816,"about_ca_system_score_gemma":0.00022376498,"threshold_uncertainty_score":0.9999608},"labels":[],"label_agreement":null},{"id":"W2131093447","doi":"10.1061/41138(386)145","title":"Integrated Decision-Support Framework for Municipal Infrastructure Asset","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University; Aecom (Canada)","funders":"","keywords":"Algorism; Decision support system; Asset (computer security); Asset management; Computer science; Process (computing); Business; Data mining; Computer security","score_opus":0.007582721223570563,"score_gpt":0.24727842744984818,"score_spread":0.23969570622627762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131093447","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23745269,0.000009335803,0.74823296,0.00005250907,0.003558271,0.00016350503,0.000040068615,0.00045593374,0.01003473],"genre_scores_gemma":[0.7029171,0.0000050668796,0.2964918,0.00010150792,0.00018709907,0.000037225578,0.000045359582,0.000021408987,0.00019345409],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994361,0.0000035018704,0.0001914862,0.000118720935,0.000090217276,0.00015997038],"domain_scores_gemma":[0.9994843,0.00011483658,0.000017956914,0.00022748843,0.00008595413,0.000069483416],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006779913,0.00012640361,0.000111747875,0.00007453903,0.000056152814,0.000058340014,0.00013803957,0.00027962742,0.0031119657],"category_scores_gemma":[0.00011695308,0.0001000814,0.000062836036,0.00014905333,0.00003189731,0.000120346434,0.000010404622,0.0004559422,0.00005540006],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029103494,0.000011011515,0.0012301167,0.000016943575,0.00005221781,9.974929e-7,0.00025723552,0.0009580843,0.010210791,0.37503064,0.055017762,0.5571851],"study_design_scores_gemma":[0.000503774,0.0000695719,0.0034725966,0.000028513656,0.000027189482,0.00006127625,0.00059371185,0.123262346,0.0116732335,0.2261625,0.63369673,0.00044852347],"about_ca_topic_score_codex":0.0000075169537,"about_ca_topic_score_gemma":0.00015990256,"teacher_disagreement_score":0.578679,"about_ca_system_score_codex":0.000016720573,"about_ca_system_score_gemma":0.000024713809,"threshold_uncertainty_score":0.99779934},"labels":[],"label_agreement":null},{"id":"W2131814871","doi":"10.5555/2431518.2431923","title":"Defining background tasks in SimFC","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Process (computing); Simplicity; Resource (disambiguation); Industrial engineering; Construction management; Simulation modeling; Estimator; Systems engineering; Simulation; Engineering; Civil engineering","score_opus":0.0475899128239266,"score_gpt":0.25295781974913323,"score_spread":0.20536790692520662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131814871","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5326547,0.000080113474,0.34305826,0.000017019502,0.0008130621,0.00011687619,0.0000050789063,0.0002992223,0.12295565],"genre_scores_gemma":[0.99878174,0.0000031121795,0.0010281394,0.000032927568,0.000024233934,0.000008711884,0.0000076425085,0.000010300541,0.00010321277],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999497,0.000014911191,0.00019659699,0.00011200566,0.00006512534,0.0001143507],"domain_scores_gemma":[0.99975604,0.000028904293,0.000021100699,0.0001127308,0.00005221864,0.000029035173],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000048754464,0.00009043872,0.00008314627,0.00009852798,0.000019021521,0.000031316627,0.00007213283,0.000065463486,0.0011486053],"category_scores_gemma":[0.000008953891,0.000094114206,0.00002313511,0.000106540065,0.000022929282,0.00025098145,0.000009731358,0.00011582362,0.0001756799],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013768136,0.0000847153,0.11688363,0.000094284114,0.00007536532,0.000012103031,0.012923285,0.21738715,0.0015385804,0.3061207,0.00041124437,0.34433126],"study_design_scores_gemma":[0.0003661039,0.000028044276,0.045070488,0.00006436015,0.000005226909,0.0000033584085,0.00045431443,0.9469176,0.00120957,0.0037246605,0.001944904,0.00021136383],"about_ca_topic_score_codex":0.000022983615,"about_ca_topic_score_gemma":0.000120661265,"teacher_disagreement_score":0.72953045,"about_ca_system_score_codex":0.00003296424,"about_ca_system_score_gemma":0.000011937312,"threshold_uncertainty_score":0.9997645},"labels":[],"label_agreement":null},{"id":"W2132272389","doi":"10.1061/9780784412329.123","title":"Data Management for Construction Processes Using Fuzzy Approach","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Fuzzy logic; Data mining; Artificial intelligence","score_opus":0.14654049767711463,"score_gpt":0.36312860545628944,"score_spread":0.2165881077791748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132272389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06644639,0.010105831,0.7968088,0.00015943286,0.01876385,0.004579676,0.0010715389,0.0015820045,0.100482516],"genre_scores_gemma":[0.7123696,0.00091271685,0.282018,0.000020457579,0.0023905116,0.00064972666,0.0006597658,0.00013705359,0.00084215053],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977257,0.0001096171,0.00040403113,0.0004072414,0.0005518626,0.0008015512],"domain_scores_gemma":[0.9981823,0.00012843577,0.00007639912,0.00072685425,0.0006478545,0.0002381424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010407275,0.00023761988,0.00023042336,0.00050922827,0.0004660903,0.00019104515,0.0004545425,0.00019679015,0.00015964945],"category_scores_gemma":[0.00011208984,0.00023991648,0.00004187524,0.0007707591,0.00063594757,0.0021397825,0.00015750794,0.00037559198,0.000043445678],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001477328,0.00016651752,0.006412622,0.0031023575,0.00056211953,0.0000018406502,0.00025388764,0.0011397531,0.0039480156,0.21254429,0.030809632,0.74091125],"study_design_scores_gemma":[0.0031644155,0.00009886448,0.00095146167,0.00036768982,0.000343586,0.0015545664,0.012421717,0.07396769,0.018301241,0.009775397,0.87734264,0.0017107194],"about_ca_topic_score_codex":0.000008353632,"about_ca_topic_score_gemma":0.000007852616,"teacher_disagreement_score":0.846533,"about_ca_system_score_codex":0.00017741002,"about_ca_system_score_gemma":0.00009649244,"threshold_uncertainty_score":0.978351},"labels":[],"label_agreement":null},{"id":"W2134842528","doi":"10.1139/l06-051","title":"Cost management for concrete batch plant using stochastic mathematical models","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Total cost; Computer science; Unit (ring theory); Stochastic modelling; Unit cost; Operations research; Value (mathematics); Operations management; Engineering; Statistics; Mathematics; Economics; Accounting","score_opus":0.01661622597421017,"score_gpt":0.19157299030549907,"score_spread":0.1749567643312889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134842528","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008439748,0.00037733902,0.9886368,0.000016355623,0.00064081803,0.000144881,0.000033008768,0.000029315432,0.001681758],"genre_scores_gemma":[0.9917309,0.0000033178599,0.007960209,0.000007018411,0.0002251062,0.000008627291,0.00000463711,0.000031281354,0.000028850996],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992918,0.000002933571,0.00031040455,0.00005676467,0.00009235242,0.00024578485],"domain_scores_gemma":[0.99960613,0.000029257026,0.000040148338,0.00006942968,0.00006267191,0.00019238084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001025744,0.000118188174,0.00016450696,0.00025931033,0.000043004984,0.000052665084,0.00008889972,0.000055582495,0.000049868875],"category_scores_gemma":[0.0000080354885,0.00012310229,0.000072918396,0.00009001112,0.000014355612,0.00015593816,0.0000022640177,0.00012180487,0.0000015772673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018483388,4.4225865e-7,0.0000031101301,0.000074517804,0.00003794157,0.000015476173,0.000043671105,0.97248137,0.00026176477,0.026052965,0.00070684246,0.00032005174],"study_design_scores_gemma":[0.00027857439,0.000011015517,0.000015310938,0.00019002537,0.000046382407,0.0002757123,0.000060708222,0.9936705,0.00014176576,0.0034906697,0.0016805646,0.00013876618],"about_ca_topic_score_codex":0.00007490586,"about_ca_topic_score_gemma":0.002621408,"teacher_disagreement_score":0.9832912,"about_ca_system_score_codex":0.000212152,"about_ca_system_score_gemma":0.00006693294,"threshold_uncertainty_score":0.5019966},"labels":[],"label_agreement":null},{"id":"W2134977903","doi":"10.1061/(asce)1052-3928(2004)130:2(109)","title":"Lessons Learned in Designing Research Methodology in Field-Based Construction Research","year":2004,"lang":"en","type":"article","venue":"Journal of Professional Issues in Engineering Education and Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bridge (graph theory); Data collection; Field (mathematics); Computer science; Management science; Construction management; Engineering; Construction industry; Systems engineering; Construction engineering; Engineering management; Civil engineering","score_opus":0.2645780431505085,"score_gpt":0.5352989676198172,"score_spread":0.27072092446930873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134977903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9003526,0.0073569445,0.04060936,0.0432312,0.005918562,0.00043619273,9.442938e-7,0.00004799009,0.0020461907],"genre_scores_gemma":[0.9016798,0.0005538087,0.0974594,0.00004895074,0.00015841612,0.000023730689,0.000001155073,0.000012304536,0.00006241388],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9981435,0.0008126883,0.00041984642,0.000111757145,0.00030645687,0.00020575557],"domain_scores_gemma":[0.996301,0.0031680092,0.000065701635,0.00007808364,0.00033957986,0.000047609316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059256824,0.00007926094,0.00016178672,0.0014150214,0.000046702753,0.000035876237,0.00009419144,0.00016404667,0.000022876431],"category_scores_gemma":[0.00393748,0.0000779113,0.00001748038,0.0007255455,0.00004486807,0.00050111074,0.000014538894,0.0016598019,0.0000031479128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010686995,0.0011590405,0.010019023,0.0010405246,0.000052261374,0.00010501758,0.027270176,0.52649486,0.06243588,0.15332027,0.00092540914,0.21610884],"study_design_scores_gemma":[0.013603595,0.0018397457,0.10539956,0.019999446,0.00007032072,0.0040921713,0.33501914,0.06793639,0.14505951,0.123770215,0.18114258,0.0020673315],"about_ca_topic_score_codex":0.00014845231,"about_ca_topic_score_gemma":0.00007997285,"teacher_disagreement_score":0.45855847,"about_ca_system_score_codex":0.00031238445,"about_ca_system_score_gemma":0.00048436166,"threshold_uncertainty_score":0.7211106},"labels":[],"label_agreement":null},{"id":"W2135413109","doi":"10.1139/l02-023","title":"Bid preparation for earthmoving operations","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scope (computer science); Plan (archaeology); Key (lock); Work (physics); Engineering; Duration (music); Cost estimate; Computer science; Operations research; Construction engineering; Transport engineering; Systems engineering; Computer security","score_opus":0.0091790690364937,"score_gpt":0.1813414417311084,"score_spread":0.17216237269461468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135413109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08482413,0.0040369607,0.8967659,0.00029813164,0.0042663524,0.0002655966,0.000029796727,0.00013434813,0.009378828],"genre_scores_gemma":[0.9977283,0.000022412874,0.0017927737,0.00001385763,0.00029950796,0.0000069109615,0.0000017910791,0.000017902119,0.000116582596],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995396,0.0000031644634,0.00021783216,0.000041531817,0.00005288625,0.00014494863],"domain_scores_gemma":[0.9996264,0.000016420268,0.000017868837,0.00005992635,0.00010078321,0.00017858265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000067787056,0.000074013406,0.00008991187,0.00024398335,0.000060304763,0.00006765189,0.00006175602,0.000048380818,0.0002990618],"category_scores_gemma":[0.000053317504,0.000079957776,0.000057677207,0.00011243002,0.000008023545,0.00027127605,8.0132594e-7,0.00010444067,0.000006859566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.78039e-7,0.0000012720972,0.00006650379,0.000021603868,0.000027989572,0.0000031274972,0.00035945393,0.9862536,0.0020917158,0.002372229,0.0052484353,0.0035533637],"study_design_scores_gemma":[0.00020373537,0.000043254633,0.0002019135,0.000058954538,0.000016349042,0.00013830153,0.00004297469,0.9184545,0.0012143737,0.0000558851,0.07943554,0.00013419785],"about_ca_topic_score_codex":0.000041400173,"about_ca_topic_score_gemma":0.035211373,"teacher_disagreement_score":0.91290414,"about_ca_system_score_codex":0.00008916574,"about_ca_system_score_gemma":0.000048308124,"threshold_uncertainty_score":0.9823935},"labels":[],"label_agreement":null},{"id":"W2135572933","doi":"10.1061/(asce)co.1943-7862.0000648","title":"Enhancing Construction As-Built Documentation Using Interactive Voice Response","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Documentation; Interactive voice response; Computer science; Schedule; Scheduling (production processes); Multimedia; Service (business); Human–computer interaction; Engineering; Telecommunications; Operations management; Operating system","score_opus":0.00606252945336838,"score_gpt":0.23629850217153672,"score_spread":0.23023597271816834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135572933","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74066436,0.000461034,0.25457194,0.000036704438,0.003642862,0.00010067453,0.0000011933031,0.00008288497,0.00043830156],"genre_scores_gemma":[0.9541351,0.0003834105,0.04511949,0.000014556097,0.00029365392,0.0000048313386,9.858668e-7,0.000020054515,0.000027896589],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990615,0.000036712976,0.00044280666,0.00008140463,0.00019018026,0.00018739112],"domain_scores_gemma":[0.99949515,0.000048775935,0.00016629268,0.000080005244,0.00009825455,0.0001115274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036106442,0.00015685936,0.00017266741,0.00045142593,0.00006683911,0.000071876915,0.00004866095,0.000064284024,0.00004248759],"category_scores_gemma":[0.000028936474,0.0001608896,0.00006283674,0.00019577295,0.000041057017,0.0010946103,0.000016359256,0.00020234153,0.0000066098532],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012276872,0.00010351524,0.003956979,0.0010441289,0.002135809,0.000049103794,0.003992287,0.19144401,0.34709975,0.055689722,0.00045119546,0.3928058],"study_design_scores_gemma":[0.011818361,0.0010664442,0.056924794,0.0040607713,0.00281609,0.057148695,0.04964881,0.20442784,0.44879425,0.004491239,0.15468216,0.0041205487],"about_ca_topic_score_codex":0.0000040356717,"about_ca_topic_score_gemma":5.862377e-7,"teacher_disagreement_score":0.38868526,"about_ca_system_score_codex":0.00019651969,"about_ca_system_score_gemma":0.000013135814,"threshold_uncertainty_score":0.6560887},"labels":[],"label_agreement":null},{"id":"W2135726511","doi":"10.1139/l10-108","title":"Scheduling model for repetitive construction processes for high-rise buildings","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Computer science; Industrial engineering; Construction management; Two-level scheduling; Distributed computing; Engineering; Dynamic priority scheduling; Schedule; Operations management; Civil engineering","score_opus":0.006114717840400141,"score_gpt":0.1843259221754707,"score_spread":0.17821120433507057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135726511","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10297876,0.00028892118,0.8940916,0.00009969509,0.002139971,0.00014737077,0.000049868675,0.00004927382,0.00015456224],"genre_scores_gemma":[0.92487407,0.000014350163,0.074551925,0.000009291945,0.00046607514,0.000025673695,0.000003620779,0.000035886686,0.000019093277],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933964,0.000001429159,0.00028858322,0.0000846389,0.000057597554,0.00022810079],"domain_scores_gemma":[0.999089,0.00005682815,0.00007430583,0.000070909926,0.00046608705,0.00024286893],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014305832,0.00012600434,0.00016285702,0.00030035822,0.00008109241,0.00006770759,0.00010104025,0.00011219872,0.000021548574],"category_scores_gemma":[0.0003258945,0.00013633794,0.00007150249,0.00013164521,0.000031247164,0.0003066119,0.000001559114,0.00025275975,3.5500662e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009861258,0.0000019096083,0.00016613836,0.00027473713,0.00006116272,0.0000015973376,0.00025581656,0.9385754,0.01718194,0.037398767,0.00042764487,0.005645054],"study_design_scores_gemma":[0.0006964838,0.000054040494,0.000072443654,0.00021783498,0.000068927606,0.00028144123,0.0001303716,0.9686853,0.014226459,0.006170762,0.009074104,0.00032181558],"about_ca_topic_score_codex":0.00003739779,"about_ca_topic_score_gemma":0.019172326,"teacher_disagreement_score":0.82189536,"about_ca_system_score_codex":0.00008235214,"about_ca_system_score_gemma":0.00042088225,"threshold_uncertainty_score":0.99872524},"labels":[],"label_agreement":null},{"id":"W2135736703","doi":"10.1109/wsc.2003.1261599","title":"An application of lean concepts and simulation for drainage operations maintenance crews","year":2004,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Drainage; Engineering; Productivity; Work (physics); Maintenance engineering; Computer science; Reliability engineering; Aeronautics; Mechanical engineering","score_opus":0.008117259914974266,"score_gpt":0.26438792448717036,"score_spread":0.2562706645721961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135736703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12715821,0.00001939992,0.8708434,0.000035616842,0.000041653253,0.00024614355,0.00000689363,0.000082339866,0.0015663434],"genre_scores_gemma":[0.9855475,0.000003746495,0.014268159,0.000023968812,0.000030834537,0.000054798944,0.000025350268,0.000006964953,0.000038709713],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997177,0.0000024032047,0.0001234195,0.00007344822,0.00003146864,0.000051546413],"domain_scores_gemma":[0.9998087,0.000011858029,0.000011879045,0.00008006326,0.000066302724,0.000021150281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000037738682,0.00004703901,0.000053052907,0.00002895253,0.000040896633,0.000013369079,0.000025248593,0.00003580487,0.0000104535275],"category_scores_gemma":[0.000007975912,0.00004394024,0.000013936284,0.00005079248,0.000028896737,0.00017757819,0.0000015652039,0.000022899907,0.0000012502137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004068008,0.000006047299,0.000034180965,0.000012115626,0.0000032914634,1.07610765e-8,0.00018769188,0.70987236,0.017932069,0.24897873,0.0000076246506,0.022961829],"study_design_scores_gemma":[0.00059178076,0.000041951855,0.0006029418,0.000006213234,0.0000060665716,0.0000012809479,0.00029698608,0.97623026,0.012507695,0.00877682,0.0008673756,0.00007060161],"about_ca_topic_score_codex":0.000034289453,"about_ca_topic_score_gemma":0.00017695456,"teacher_disagreement_score":0.85838926,"about_ca_system_score_codex":0.000020033012,"about_ca_system_score_gemma":0.00000663354,"threshold_uncertainty_score":0.1791831},"labels":[],"label_agreement":null},{"id":"W2135975163","doi":"10.1061/41084(364)50","title":"Guide for Seismic Rehabilitation of Existing Concrete Buildings: Vision","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Construction engineering; Resource (disambiguation); Rehabilitation; Computer science; Civil engineering; Engineering; Architectural engineering","score_opus":0.011118216446530839,"score_gpt":0.26962813094573324,"score_spread":0.2585099144992024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135975163","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25292045,0.000093727336,0.6829388,0.0003228609,0.0003150062,0.0002476455,0.0000052952737,0.00031085382,0.06284536],"genre_scores_gemma":[0.91225636,0.000003963437,0.08720945,0.000047810696,0.000042156815,0.0000069117,0.0000053149843,0.000005658312,0.00042235813],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999612,0.0000046736855,0.00020188036,0.00006665014,0.00005017366,0.00006462972],"domain_scores_gemma":[0.9997364,0.00007457628,0.000025334599,0.00006676648,0.00008165106,0.000015251481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009804539,0.000050473645,0.00007217095,0.00004888478,0.000022622877,0.000009129018,0.000030320693,0.000040076648,0.00002026078],"category_scores_gemma":[0.00007025989,0.0000473527,0.000039186933,0.000066602326,0.000013391731,0.000105258274,0.0000015524184,0.000028136352,0.0000021631117],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020176647,0.0000029379605,0.000089330024,0.000087724235,0.000011696295,6.967354e-8,0.000347841,0.00913776,0.3150807,0.132456,0.014655144,0.5281106],"study_design_scores_gemma":[0.0008497714,0.0006362085,0.0012104143,0.00015820817,0.000024102326,0.000008097852,0.0008450529,0.7140714,0.11327422,0.018254092,0.1503832,0.00028525203],"about_ca_topic_score_codex":0.000009694535,"about_ca_topic_score_gemma":0.0000015070409,"teacher_disagreement_score":0.70493364,"about_ca_system_score_codex":0.000024426687,"about_ca_system_score_gemma":0.0000051082984,"threshold_uncertainty_score":0.19309871},"labels":[],"label_agreement":null},{"id":"W2136062440","doi":"10.5555/1351542.1351908","title":"Process flowcharting and simulation of house structure components production process","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Flowchart; Production (economics); Manufacturing engineering; Lean manufacturing; Factory (object-oriented programming); Computer science; Construct (python library); Productivity; Process management; Chart; Plan (archaeology); Process modeling; Work in process; Engineering; Industrial engineering; Systems engineering; Operations management","score_opus":0.020523619329051803,"score_gpt":0.2702818307865388,"score_spread":0.24975821145748697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136062440","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.721142,0.000017876097,0.27801782,0.000013914342,0.0002996427,0.00015900146,0.0000039133993,0.00018154462,0.0001642591],"genre_scores_gemma":[0.9995905,0.0000013916991,0.00023650458,0.000008125407,0.00011070362,0.0000030494343,0.00001307053,0.000021194632,0.000015442578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913484,0.000020654292,0.00035318095,0.0001829693,0.00017687751,0.00013147441],"domain_scores_gemma":[0.9993338,0.000044781693,0.00010366567,0.0001111434,0.00036346307,0.000043174245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016242154,0.00013246982,0.00013423777,0.00013040719,0.00005607577,0.000030337502,0.000058698442,0.00009019911,0.00004837549],"category_scores_gemma":[0.000059285903,0.00013090688,0.000019884197,0.00017365883,0.000048240923,0.00050840323,0.000007569622,0.00012372596,0.000002516066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023505123,0.000008852369,0.0058061588,0.00013758369,0.000013823233,2.1051771e-7,0.0018373558,0.9419345,0.015076098,0.00008689139,0.0000012261489,0.035073772],"study_design_scores_gemma":[0.00021312972,0.00001900088,0.015761353,0.000097576965,0.000012940478,0.0000033683318,0.0003320643,0.94548446,0.036835566,0.001068393,0.000033433396,0.00013873476],"about_ca_topic_score_codex":0.0000023438113,"about_ca_topic_score_gemma":0.000021264857,"teacher_disagreement_score":0.2784485,"about_ca_system_score_codex":0.000023568264,"about_ca_system_score_gemma":0.000012255834,"threshold_uncertainty_score":0.5338228},"labels":[],"label_agreement":null},{"id":"W2138204878","doi":"10.1061/40754(183)135","title":"Selecting Pile Construction Method Using Fuzzy Approach","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Pile; Robustness (evolution); Fuzzy logic; Sensitivity (control systems); Computer science; Fuzzy set; Engineering; Data mining; Artificial intelligence; Algorithm","score_opus":0.016877043817336224,"score_gpt":0.24610738118204334,"score_spread":0.2292303373647071,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138204878","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038508337,0.00005716615,0.8259346,0.000014566455,0.00029436834,0.000059259626,7.5621426e-7,0.0004617242,0.13466924],"genre_scores_gemma":[0.40451023,0.0000033504302,0.59508663,0.000019588035,0.00024141952,0.000004435245,0.000002546389,0.000011475233,0.000120296],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995146,0.000018339693,0.00015444646,0.000108353706,0.00007349896,0.00013078052],"domain_scores_gemma":[0.9998213,0.000013421259,0.000018825243,0.00007719226,0.000036325742,0.000032932632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009465248,0.00008723596,0.0000830946,0.000077033976,0.00007858236,0.000036807483,0.000035139747,0.000071376075,0.00015857941],"category_scores_gemma":[0.000005622976,0.000084616884,0.000033515422,0.00018830584,0.000016131282,0.00021564504,0.000005111989,0.00012695248,0.000020835176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004368748,0.000014455782,0.00084270467,0.000032645206,0.000054717904,1.8839785e-7,0.00027577693,0.1837591,0.066310465,0.057206575,0.00059575756,0.69090325],"study_design_scores_gemma":[0.00015281953,0.0000051810157,0.000054564065,0.0000052364207,0.000015879084,0.00025672148,0.0006416068,0.94045275,0.052564748,0.0005675254,0.0051211324,0.00016185212],"about_ca_topic_score_codex":0.00001836763,"about_ca_topic_score_gemma":0.000008398045,"teacher_disagreement_score":0.75669366,"about_ca_system_score_codex":0.00007912619,"about_ca_system_score_gemma":0.000011485119,"threshold_uncertainty_score":0.34505764},"labels":[],"label_agreement":null},{"id":"W2138349055","doi":"10.5555/2675983.2676387","title":"Effective simulation of earth moving projects","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Context (archaeology); Process (computing); Task (project management); Earth observation; Resource (disambiguation); Systems engineering; Software engineering; Industrial engineering; Simulation; Engineering; Programming language; Aerospace engineering; Geology","score_opus":0.015447538257242828,"score_gpt":0.23656339037135962,"score_spread":0.2211158521141168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138349055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50851166,0.000016484055,0.48402345,0.0000129199,0.0002814177,0.00040258587,0.0000026387047,0.00016480275,0.006584064],"genre_scores_gemma":[0.9992562,0.0000011476521,0.00048069868,0.000014472544,0.000056835142,0.00004008362,0.000007807952,0.000012026069,0.00013074638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994017,0.000028891835,0.00022815239,0.000120970944,0.00011585658,0.00010444391],"domain_scores_gemma":[0.9993703,0.00012720488,0.00005392752,0.00012990613,0.00028730437,0.000031377243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000043307693,0.000107604894,0.00011919536,0.00010431727,0.000028319208,0.00004673234,0.000060071052,0.000070074355,0.00054128515],"category_scores_gemma":[0.000041659623,0.000103001206,0.000040434992,0.00012632394,0.00003099119,0.0004426479,0.000011453398,0.000090818896,0.00009249389],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051380794,0.0000064613328,0.0017512813,0.000031780943,0.000016240188,8.210501e-8,0.0005427259,0.9132725,0.005967844,0.00080777734,0.00001373966,0.077584445],"study_design_scores_gemma":[0.00018181207,0.000029731067,0.018869853,0.000053323674,0.0000063467537,4.8985345e-7,0.00009553235,0.9723869,0.0074284193,0.0005755337,0.00026989737,0.00010218624],"about_ca_topic_score_codex":0.00001870438,"about_ca_topic_score_gemma":0.0000116914725,"teacher_disagreement_score":0.49074453,"about_ca_system_score_codex":0.000016879549,"about_ca_system_score_gemma":0.000012741855,"threshold_uncertainty_score":0.5926693},"labels":[],"label_agreement":null},{"id":"W2138906600","doi":"10.1061/(asce)0742-597x(2009)25:1(12)","title":"Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Construction management; Process (computing); Engineering; Construction industry; Quality (philosophy); Project management; Integrated project delivery; Simulation modeling; Construction engineering; Computer science; Operations research; Systems engineering; Civil engineering","score_opus":0.011925511758755848,"score_gpt":0.20372588228247263,"score_spread":0.1918003705237168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138906600","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98308915,0.00030849894,0.01592254,0.00001034338,0.0003481263,0.00012559022,3.3275427e-7,0.000022192995,0.0001732423],"genre_scores_gemma":[0.9947141,0.0009594518,0.0042530103,0.0000052288374,0.000043602937,0.0000064827323,2.543372e-7,0.000011181151,0.0000067034316],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993624,0.000009505349,0.000302621,0.000059347713,0.00013462195,0.00013146857],"domain_scores_gemma":[0.9998237,0.000020152404,0.00004840734,0.00004588584,0.000022797652,0.00003907017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018617942,0.0001082089,0.00013956988,0.00045644914,0.000014861742,0.000015483416,0.00005228089,0.00003920799,0.000010092234],"category_scores_gemma":[0.0000058037663,0.00009799077,0.000028432021,0.00016806023,0.000007808852,0.00031531393,0.0000065003665,0.00021596599,0.0000022162471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045130862,0.000020033278,0.0068198093,0.0000759598,0.000054190805,0.000040158553,0.000159145,0.98020864,0.0010949348,0.0006523688,0.000021622538,0.010808029],"study_design_scores_gemma":[0.0017771382,0.00025491664,0.33440828,0.0004237354,0.000015531155,0.00018022272,0.00012341702,0.6573693,0.0049897875,0.00003580998,0.0001897014,0.00023215813],"about_ca_topic_score_codex":0.0000013433014,"about_ca_topic_score_gemma":3.858309e-7,"teacher_disagreement_score":0.32758847,"about_ca_system_score_codex":0.00016572939,"about_ca_system_score_gemma":0.0000066972943,"threshold_uncertainty_score":0.39959475},"labels":[],"label_agreement":null},{"id":"W2138951297","doi":"10.5555/1516744.1517174","title":"A simulation template for modeling tunnel shaft construction","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; University of Alberta","funders":"","keywords":"Visualization; Tunnel construction; Template; Code (set theory); Computer science; Engineering; Systems engineering; Construction engineering; Data mining; Structural engineering","score_opus":0.05861605281988389,"score_gpt":0.2692427108025743,"score_spread":0.2106266579826904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138951297","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1702211,0.00002286021,0.8272801,0.00003102005,0.0006641511,0.0002505481,0.00001565628,0.0003652711,0.0011492957],"genre_scores_gemma":[0.99319845,0.000007638691,0.0063289027,0.000033529588,0.00018836481,0.00004103555,0.000051153747,0.000025900095,0.00012501093],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990921,0.000016338043,0.00036315867,0.00021408143,0.00013641575,0.00017792934],"domain_scores_gemma":[0.9992671,0.00011946967,0.000053103922,0.00016126301,0.00034210493,0.00005698328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006075929,0.00017007826,0.00015674728,0.00013682131,0.0001682946,0.000051405084,0.000080496,0.00012586568,0.00016899995],"category_scores_gemma":[0.00004850766,0.00018203938,0.00008092899,0.0001202887,0.000049136317,0.00046947206,0.000009527477,0.0001162168,0.000036735662],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028612034,0.00000526642,0.00031538281,0.0000189174,0.00001852059,3.496465e-7,0.00036106896,0.9852473,0.00048645376,0.0012765387,0.00003398776,0.012207573],"study_design_scores_gemma":[0.00047144975,0.000024078572,0.00021324972,0.000035023513,0.000013559779,0.000010524524,0.0000888894,0.99517226,0.00042957647,0.0020935028,0.001244936,0.00020293357],"about_ca_topic_score_codex":0.0000055057785,"about_ca_topic_score_gemma":0.000010672323,"teacher_disagreement_score":0.82297736,"about_ca_system_score_codex":0.000059979273,"about_ca_system_score_gemma":0.000030346071,"threshold_uncertainty_score":0.742335},"labels":[],"label_agreement":null},{"id":"W2140690096","doi":"10.1061/9780784412329.057","title":"A Framework for an Integrated and Evolutionary Body of Knowledge","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; École de Technologie Supérieure; Cégep Marie-Victorin","funders":"","keywords":"Knowledge management; Computer science; Situated; Process (computing); Sustainability; Context (archaeology); Fragmentation (computing); Body of knowledge; Process management; Engineering; Artificial intelligence","score_opus":0.05392149397242824,"score_gpt":0.3539983836410189,"score_spread":0.30007688966859064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140690096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.704618,0.018951206,0.2540487,0.0001391962,0.00956925,0.0016479269,0.00027384082,0.0006456427,0.010106259],"genre_scores_gemma":[0.97695416,0.0001812531,0.022146828,0.0000028048426,0.0003689185,0.00014227284,0.00002403439,0.000025133499,0.00015457193],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988863,0.00012856092,0.00025439507,0.00015139667,0.00019710945,0.00038225538],"domain_scores_gemma":[0.9986064,0.0002738533,0.00003870223,0.00021174763,0.0006588655,0.00021042094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005510151,0.00012575607,0.00017120471,0.00033676164,0.00016392083,0.000033777742,0.00010502285,0.00020769218,0.00023367915],"category_scores_gemma":[0.00019627353,0.00012064839,0.000041966694,0.00034434278,0.0006077062,0.0007845413,0.000027238862,0.00035797234,0.00001699987],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013000185,0.00012086095,0.020374002,0.0003136549,0.00012726111,2.14664e-7,0.000563716,0.000035902885,0.008404514,0.6441087,0.01020214,0.315619],"study_design_scores_gemma":[0.0035425124,0.0009990635,0.0667478,0.0009793922,0.00017132412,0.0005439267,0.012261176,0.0715864,0.059793282,0.117679715,0.66394454,0.0017508654],"about_ca_topic_score_codex":0.000012696521,"about_ca_topic_score_gemma":0.000009356033,"teacher_disagreement_score":0.65374243,"about_ca_system_score_codex":0.00007283387,"about_ca_system_score_gemma":0.00006854145,"threshold_uncertainty_score":0.49198982},"labels":[],"label_agreement":null},{"id":"W2141122753","doi":"10.1061/(asce)0733-9364(2004)130:5(638)","title":"Planning and Scheduling Highway Construction","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Unavailability; Scheduling (production processes); Computer science; Software; Project planning; Operations research; Transport engineering; Software engineering; Systems engineering; Industrial engineering; Project management; Engineering; Operations management; Operating system; Reliability engineering","score_opus":0.004811195081526139,"score_gpt":0.18399221063971358,"score_spread":0.17918101555818744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141122753","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54255307,0.0016937951,0.45263788,0.00010049499,0.0019484551,0.00007413596,9.607128e-7,0.00013921122,0.00085198047],"genre_scores_gemma":[0.89928097,0.0008930751,0.09964068,0.000009524832,0.00015256861,0.0000026844805,5.6889763e-7,0.000013222353,0.0000066838998],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939364,0.000004526994,0.00029367648,0.00007994428,0.000117186995,0.00011103541],"domain_scores_gemma":[0.99974185,0.000009731634,0.0000737864,0.000052797677,0.00004730567,0.000074550204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010342937,0.00011866149,0.00014460162,0.00029227795,0.00005473698,0.000060154784,0.000033836757,0.000054047818,0.00000477597],"category_scores_gemma":[0.000006255861,0.00011710254,0.000032757114,0.00011628636,0.000052730924,0.0002675065,0.000011498337,0.00016899376,7.5635523e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018932496,0.000007927574,0.0007379617,0.00031883008,0.00027967044,0.00003412143,0.00024658677,0.67427105,0.0035891214,0.15798542,0.00003834782,0.16247204],"study_design_scores_gemma":[0.034691006,0.0016252956,0.08006507,0.010882471,0.002636038,0.09827259,0.030535897,0.4053777,0.06701378,0.06506993,0.19742216,0.006408062],"about_ca_topic_score_codex":8.832699e-7,"about_ca_topic_score_gemma":2.0535843e-7,"teacher_disagreement_score":0.35672793,"about_ca_system_score_codex":0.00005398175,"about_ca_system_score_gemma":0.000007434717,"threshold_uncertainty_score":0.47753033},"labels":[],"label_agreement":null},{"id":"W2141452637","doi":"10.5555/2675983.2676355","title":"Utilizing simulation derived quantitative formulas for accurate excavator Hauler fleet selection","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Excavator; Earthworks; Granularity; Computer science; Selection (genetic algorithm); Discrete event simulation; Field (mathematics); Production (economics); Duration (music); Industrial engineering; Operations research; Engineering; Simulation; Civil engineering; Artificial intelligence; Mathematics","score_opus":0.055052437493833185,"score_gpt":0.29979217662287627,"score_spread":0.2447397391290431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141452637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2715206,0.000020804515,0.72575575,0.000051879368,0.0004917994,0.00055946026,0.000010183015,0.0003280223,0.0012614779],"genre_scores_gemma":[0.9943716,0.0000037232924,0.005022258,0.00006426767,0.00011252883,0.00017115854,0.000059102975,0.000033394434,0.00016199258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989419,0.000032436772,0.0003996255,0.0002476734,0.00014068122,0.00023769871],"domain_scores_gemma":[0.9987714,0.0002503184,0.000098240394,0.00013552187,0.0006762506,0.00006825203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007830507,0.00021474806,0.00018011697,0.00014818701,0.00014106432,0.00020606368,0.00009398756,0.0001394817,0.000668515],"category_scores_gemma":[0.00009633108,0.00021528883,0.000082254264,0.00017860532,0.000034250952,0.0011673596,0.000012479893,0.00013010876,0.00014844471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003412071,0.000010429091,0.00030201813,0.000036885704,0.000043515036,8.4902084e-8,0.0006072386,0.94965965,0.013837747,0.005696968,0.00019581667,0.029575532],"study_design_scores_gemma":[0.00046199257,0.00006271873,0.0026961134,0.000046533365,0.000017412494,0.0000012092984,0.00030644046,0.9846722,0.006607801,0.0025366242,0.0023479438,0.00024304615],"about_ca_topic_score_codex":0.000016124899,"about_ca_topic_score_gemma":0.00004180709,"teacher_disagreement_score":0.7228509,"about_ca_system_score_codex":0.00009009772,"about_ca_system_score_gemma":0.000028518405,"threshold_uncertainty_score":0.87792236},"labels":[],"label_agreement":null},{"id":"W2142329171","doi":"10.5555/2693848.2694258","title":"Simulation-based multiobjective optimization of bridge construction processes using parallel computing","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Sorting; Bridge (graph theory); Multi-objective optimization; Convergence (economics); Discrete event simulation; Mathematical optimization; Genetic algorithm; Computation; Distributed computing; sort; Range (aeronautics); Pareto principle; Resource (disambiguation); Algorithm; Simulation; Engineering; Mathematics","score_opus":0.014473997031874882,"score_gpt":0.23870869202765216,"score_spread":0.22423469499577728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142329171","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.064992756,0.000013298907,0.9332709,0.000004230101,0.00020529206,0.00010421975,0.000002293876,0.00020752253,0.0011995033],"genre_scores_gemma":[0.85032743,9.945179e-7,0.14958236,0.000010239179,0.0000515413,0.000001771635,0.000012010965,0.000011047006,0.0000025908555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999477,0.000020735579,0.0002271348,0.00009947419,0.000092942406,0.00008266624],"domain_scores_gemma":[0.9993805,0.00017881427,0.000070311144,0.00007266374,0.00027565443,0.000022006694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000057885743,0.000089528345,0.000108983804,0.00009926601,0.00006067483,0.000019571777,0.000032578784,0.00006118744,0.000043131535],"category_scores_gemma":[0.00011854847,0.00009094374,0.000026216001,0.00023129956,0.00004615009,0.00015164595,0.0000034557281,0.000051930263,0.000001604613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053327212,0.0000061899195,0.0017879538,0.00006877013,0.000009364216,1.9177063e-8,0.00006089998,0.99033326,0.00027138196,0.0006083161,0.0000016720606,0.0068468526],"study_design_scores_gemma":[0.0002985647,0.000012591383,0.00054861524,0.000034839868,0.000012186036,0.0000012189736,0.00006329972,0.99493027,0.0038965237,0.000086833505,0.000017359664,0.00009768623],"about_ca_topic_score_codex":0.000029799468,"about_ca_topic_score_gemma":0.00000915724,"teacher_disagreement_score":0.7853347,"about_ca_system_score_codex":0.00003816877,"about_ca_system_score_gemma":0.000031830805,"threshold_uncertainty_score":0.3708578},"labels":[],"label_agreement":null},{"id":"W2143380513","doi":"10.1061/40704(2003)8","title":"A Unified Approach to Project Management","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Interdependence; Task (project management); Project management; Work (physics); Focus (optics); Representation (politics); Project management triangle; Process management; Knowledge management; Management science; Systems engineering; Engineering","score_opus":0.014555246321302515,"score_gpt":0.20486451401495934,"score_spread":0.19030926769365683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143380513","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020815316,0.000009926239,0.20994009,0.0000048024845,0.000113837894,0.00012092663,1.9760608e-7,0.00016839134,0.7875603],"genre_scores_gemma":[0.9226756,0.00000565568,0.0644691,0.00007264182,0.000014795307,0.000083900064,0.0000019507802,0.000009200885,0.012667147],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99978733,0.0000045036827,0.000049829756,0.00005558506,0.00003986549,0.00006286359],"domain_scores_gemma":[0.999904,0.0000011175343,0.0000019300796,0.00006985778,0.0000068705986,0.000016233964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025154846,0.000039697938,0.000028941233,0.000053361528,0.000012950509,0.000014181539,0.000024274428,0.000015836862,0.000048998638],"category_scores_gemma":[0.0000010062796,0.00003375531,0.000011056291,0.00014141027,0.000002635142,0.00002574014,0.0000021801814,0.00002401303,0.00005889813],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010899042,0.000010443173,0.000030210898,0.000022863655,0.00001984,2.8455742e-7,0.00010544818,0.0019840638,0.00017326811,0.9617676,0.01768328,0.018201584],"study_design_scores_gemma":[0.0003543949,0.000021247135,0.0004264465,0.000008865348,0.000015257822,0.00002209499,0.0023115072,0.014034501,0.007706538,0.0017668662,0.9730276,0.00030467837],"about_ca_topic_score_codex":0.0000029646924,"about_ca_topic_score_gemma":0.0000018018853,"teacher_disagreement_score":0.96000075,"about_ca_system_score_codex":0.00001549082,"about_ca_system_score_gemma":0.0000022427453,"threshold_uncertainty_score":0.13765015},"labels":[],"label_agreement":null},{"id":"W2143383694","doi":"10.5267/j.msl.2013.06.033","title":"An ABC analysis for power generation project","year":2013,"lang":"en","type":"article","venue":"Management Science Letters","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Power (physics); Operations management; Process management; Business; Engineering","score_opus":0.011514354845714806,"score_gpt":0.2277844279597255,"score_spread":0.2162700731140107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143383694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49692798,0.0000027302988,0.49951488,0.0004982715,0.0003168461,0.000330718,9.779734e-7,0.00011725671,0.002290349],"genre_scores_gemma":[0.98733556,0.0000015050277,0.011665787,0.00070009904,0.000043435626,0.0001698781,0.000009591721,0.000004552265,0.00006956729],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943346,0.000004662875,0.00009193149,0.00016816908,0.0001512288,0.00015056733],"domain_scores_gemma":[0.9997747,0.0000022107167,0.000014111049,0.00016687387,0.000017323273,0.00002480691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001267791,0.00006002155,0.000048510174,0.0003886194,0.00012373336,0.00022495675,0.00014529031,0.000011679058,0.0000738096],"category_scores_gemma":[0.000001499186,0.000054172684,0.000034668225,0.00078967074,0.00006137143,0.0006447579,0.000007210057,0.000022581908,0.000023427234],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026757402,0.000033278724,0.012257898,0.000028462286,0.00033238958,0.0000011189774,0.00075660646,0.265382,0.5729649,0.03692088,0.03954867,0.0717711],"study_design_scores_gemma":[0.00014254142,0.000023619426,0.039021417,0.000002274707,0.000088740984,4.5423428e-7,0.00036268085,0.9495128,0.005280386,0.000112603186,0.0052465685,0.00020594103],"about_ca_topic_score_codex":0.000018138695,"about_ca_topic_score_gemma":0.000007852497,"teacher_disagreement_score":0.6841308,"about_ca_system_score_codex":0.000048685073,"about_ca_system_score_gemma":0.000001495642,"threshold_uncertainty_score":0.22090979},"labels":[],"label_agreement":null},{"id":"W2143401283","doi":"","title":"Framework Of A Virtual Laboratory For Construction Project Management","year":2006,"lang":"en","type":"article","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Schedule; Project management; Computer science; Task (project management); Process (computing); Takeoff; Duration (music); Project planning; Project management triangle; Construction management; Systems engineering; Engineering management; Operations research; Construction engineering; Engineering; Civil engineering","score_opus":0.00545001794329291,"score_gpt":0.21901619818341764,"score_spread":0.21356618024012472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143401283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27378207,0.0004737699,0.70153236,0.00018146007,0.0029288305,0.0010981631,0.00009722732,0.0006277094,0.019278403],"genre_scores_gemma":[0.9538383,0.000026945385,0.044816777,0.000019767664,0.00025138655,0.00012786068,0.000017380282,0.000027489159,0.0008741212],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994887,0.000011366777,0.00016248322,0.000114171635,0.00010177843,0.000121512436],"domain_scores_gemma":[0.9997181,0.000027259379,0.00004263711,0.00013136199,0.00006493525,0.000015673408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005940499,0.00009924179,0.000107280815,0.000115078736,0.00003817803,0.00001969583,0.000051037383,0.00009519821,0.00002991078],"category_scores_gemma":[0.000009113653,0.00010133798,0.00003861924,0.00022831149,0.000048165766,0.000091739355,0.0000070664196,0.00008122416,0.000008949329],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006242769,0.000038576847,0.00086065277,0.00023777729,0.00009728495,0.0000017638582,0.00030270874,0.0053509544,0.008526784,0.90885496,0.0181562,0.057509933],"study_design_scores_gemma":[0.0023939912,0.00037291317,0.0054589794,0.0004284752,0.00021426239,0.00002992639,0.0058644526,0.017028281,0.19001329,0.0217658,0.7553199,0.0011097529],"about_ca_topic_score_codex":0.000008862317,"about_ca_topic_score_gemma":0.000020495236,"teacher_disagreement_score":0.88708913,"about_ca_system_score_codex":0.000043006006,"about_ca_system_score_gemma":0.000015987463,"threshold_uncertainty_score":0.41324428},"labels":[],"label_agreement":null},{"id":"W2143561132","doi":"10.5555/2433508.2433913","title":"Advanced simulation of tower crane operation utilizing system dynamics modeling and lean principles","year":2010,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Tower crane; Swing; Tower; Process (computing); Computer science; Engineering; Simulation; Mechanical engineering; Civil engineering; Structural engineering","score_opus":0.02329628047343545,"score_gpt":0.24950429191002682,"score_spread":0.22620801143659136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143561132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49467075,0.000011863372,0.503058,0.000008681937,0.00034954122,0.00010675771,0.000005336497,0.000118491625,0.0016705575],"genre_scores_gemma":[0.99793816,0.0000038163244,0.0019050183,0.000005022864,0.000051406987,0.000007327691,0.00003027211,0.000015948392,0.000043012224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992299,0.000011698188,0.0003647986,0.00016629299,0.00012496227,0.00010232451],"domain_scores_gemma":[0.9994327,0.00005431557,0.000062959705,0.00016232912,0.00024785302,0.000039877785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009585105,0.00012967283,0.000145437,0.000099229495,0.00006341527,0.00005829807,0.000063902226,0.000108339955,0.0000573852],"category_scores_gemma":[0.00003295161,0.00013212388,0.0000296343,0.000071338894,0.00003223259,0.00041488418,0.000016251652,0.00016209306,0.0000031978423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013504204,0.000003926868,0.00049948273,0.000053483498,0.000008496349,1.3227934e-7,0.0003099594,0.9529238,0.0070810104,0.016935088,2.3012609e-7,0.022170903],"study_design_scores_gemma":[0.000251967,0.000015325884,0.00028209187,0.00008577324,0.000011308805,0.0000025042748,0.00047689443,0.99734116,0.0011916074,0.00015385193,0.0000599397,0.00012760767],"about_ca_topic_score_codex":0.000008113783,"about_ca_topic_score_gemma":0.00014345445,"teacher_disagreement_score":0.50326747,"about_ca_system_score_codex":0.00004081539,"about_ca_system_score_gemma":0.000016869626,"threshold_uncertainty_score":0.5387855},"labels":[],"label_agreement":null},{"id":"W2143679217","doi":"10.5555/1218112.1218481","title":"Sensitivity analysis of construction simulation using Cell-DEVS and microcyclone","year":2006,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Sensitivity (control systems); DEVS; Computer science; Visualization; Resource (disambiguation); Discrete event simulation; Modeling and simulation; Simulation modeling; Resource allocation; Space (punctuation); Distributed computing; Data visualization; Industrial engineering; Mathematical optimization; Data mining; Simulation; Engineering; Mathematics; Computer network","score_opus":0.014024211744141361,"score_gpt":0.2329424468883221,"score_spread":0.21891823514418074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143679217","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5485784,0.000020371019,0.4507173,0.000003557313,0.00009300426,0.000048579626,0.000012744348,0.000052039642,0.00047402404],"genre_scores_gemma":[0.99721783,0.0000028027814,0.0026655442,0.0000052993355,0.00004291158,0.0000010804289,0.000033910368,0.000008560485,0.000022074395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929994,0.000036175323,0.00030904333,0.00015383401,0.00010717059,0.00009384335],"domain_scores_gemma":[0.99946094,0.00009793008,0.00009594068,0.0001144901,0.0002062183,0.000024509583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007050599,0.00011859791,0.00019708044,0.00028860112,0.000047678004,0.00004160703,0.000023090344,0.000087485656,0.000072478],"category_scores_gemma":[0.000008236783,0.00012926936,0.000060644146,0.00035432918,0.00007163622,0.00023945599,0.00000971763,0.00007101887,0.000001845671],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009129636,0.000006994555,0.015176063,0.00001720404,0.000056881454,2.9307964e-7,0.00009424259,0.9414239,0.03783707,0.00047584236,0.0000018195336,0.0049005495],"study_design_scores_gemma":[0.00017929453,0.0000063569832,0.029250527,0.000014763201,0.00020094063,0.0000021715132,0.000071636656,0.96120524,0.008721789,0.00016380985,0.00006482585,0.00011863615],"about_ca_topic_score_codex":0.00011860956,"about_ca_topic_score_gemma":0.0001249195,"teacher_disagreement_score":0.44863942,"about_ca_system_score_codex":0.000038817725,"about_ca_system_score_gemma":0.000011270521,"threshold_uncertainty_score":0.52714515},"labels":[],"label_agreement":null},{"id":"W2144127793","doi":"10.1061/9780784412329.107","title":"A Hybrid Framework for Modeling Construction Operations Using Discrete Event Simulation and System Dynamics","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Discrete event simulation; Computer science; Identification (biology); System dynamics; Event (particle physics); Systems engineering; Simulation modeling; Interface (matter); Computation; Industrial engineering; Simulation; Engineering; Artificial intelligence","score_opus":0.055370316662297026,"score_gpt":0.35740741732702436,"score_spread":0.30203710066472733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144127793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2648211,0.0006945544,0.7304008,0.000034457193,0.0028989557,0.0006190904,0.000090387446,0.00023076782,0.00020986403],"genre_scores_gemma":[0.94107616,0.000056709272,0.05793045,0.000003999368,0.0006393771,0.00015711781,0.000060010414,0.00004831503,0.000027864631],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981002,0.00015212833,0.00048025933,0.00027946904,0.00039637918,0.00059155136],"domain_scores_gemma":[0.9985374,0.00022772794,0.00005541002,0.00027285598,0.0006545975,0.0002519858],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007201163,0.00022752021,0.00024528758,0.00041327675,0.00073051977,0.00023607582,0.00010106465,0.00021722501,0.000051500345],"category_scores_gemma":[0.00016500262,0.0002374516,0.00007996008,0.00027411393,0.00034483417,0.0013568433,0.000043996843,0.00047343876,0.000010940792],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040656003,0.000011260334,0.0016972192,0.0002300173,0.00007344888,4.107403e-7,0.000129066,0.5705399,0.00040063067,0.3886358,0.000027534015,0.038214047],"study_design_scores_gemma":[0.00033070683,0.000020033602,0.000046219535,0.0001884377,0.00004351118,0.00021368754,0.0022831224,0.9925967,0.00047753015,0.0031671652,0.00038620256,0.00024668855],"about_ca_topic_score_codex":0.000036043937,"about_ca_topic_score_gemma":0.000020208934,"teacher_disagreement_score":0.67625505,"about_ca_system_score_codex":0.0005256236,"about_ca_system_score_gemma":0.00007203817,"threshold_uncertainty_score":0.96829957},"labels":[],"label_agreement":null},{"id":"W2144244610","doi":"10.1139/l2012-104","title":"Advanced formwork method integrated with a layout planning model for tall building construction","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formwork; Heuristic; Table (database); Engineering; Construction engineering; Civil engineering; Computer science; Engineering drawing; Data mining; Artificial intelligence","score_opus":0.010227092181245371,"score_gpt":0.21702511137806912,"score_spread":0.20679801919682375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144244610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03849265,0.0008899407,0.9588955,0.0000164372,0.0009504114,0.00009619419,0.000012834844,0.000057941776,0.00058805797],"genre_scores_gemma":[0.79365313,0.0000035449584,0.20608388,0.0000103657085,0.00018553759,0.0000103727,0.000003125601,0.0000364983,0.000013547753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916995,0.000006103067,0.00029085446,0.00006596549,0.000088783,0.0003783411],"domain_scores_gemma":[0.99926937,0.000042058084,0.00007931622,0.00007545022,0.0001470363,0.00038677428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020641733,0.00016573077,0.00020805371,0.0003505215,0.000068623514,0.000047224603,0.00009120339,0.00009077094,0.00001919051],"category_scores_gemma":[0.00004828526,0.00015202328,0.000071370865,0.00020626925,0.00001774295,0.0005695633,0.000002004164,0.0002803758,4.4516077e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011909207,0.0000011269699,0.00044503194,0.00003730957,0.00006237592,0.0000021805981,0.0004573973,0.9867271,0.0018094933,0.004210877,0.0001756218,0.0060595586],"study_design_scores_gemma":[0.00044983748,0.000038744987,0.00011388307,0.0003174114,0.000048667953,0.0005520505,0.00038591243,0.98916155,0.0015602008,0.00019604065,0.0069457134,0.00022996124],"about_ca_topic_score_codex":0.000031177853,"about_ca_topic_score_gemma":0.002197773,"teacher_disagreement_score":0.7551605,"about_ca_system_score_codex":0.0002471164,"about_ca_system_score_gemma":0.00017943358,"threshold_uncertainty_score":0.6199329},"labels":[],"label_agreement":null},{"id":"W2144433307","doi":"10.1016/s0926-5805(99)00002-3","title":"A development framework for data models for computer-integrated facilities management","year":2000,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Interoperability; Engineering management; Facility management; Data management; Architecture; Construction management; Computer science; Systems engineering; Engineering; Data sharing; Software engineering; Database; Business; World Wide Web","score_opus":0.030962210141640918,"score_gpt":0.24504336583325712,"score_spread":0.2140811556916162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144433307","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039264943,0.000034878056,0.9574333,0.000041215746,0.0008255682,0.0007042401,0.00010699735,0.00049007667,0.0010987794],"genre_scores_gemma":[0.081481025,0.000040890776,0.917065,0.000021093083,0.00008400288,0.00046591082,0.0006664561,0.000018264138,0.00015733663],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990648,0.000012767073,0.00040777153,0.00023965028,0.00010570701,0.00016932061],"domain_scores_gemma":[0.9995698,0.000057542788,0.000038906324,0.00024847162,0.000058374226,0.000026903637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014307025,0.00014016294,0.00013573178,0.00016080236,0.000100317935,0.00007175696,0.0001416425,0.000116092786,0.0001355537],"category_scores_gemma":[0.000005909761,0.0001520236,0.000029592182,0.00017649734,0.00003512799,0.0004949071,0.000010940311,0.000077282915,0.00001379611],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001877088,0.000008109108,0.000021541335,0.00012386365,0.00003653956,1.04160314e-7,0.0002823306,0.042599283,0.00000925917,0.07965817,0.0005330952,0.8767089],"study_design_scores_gemma":[0.00043969476,0.000010769045,0.0001254099,0.00009191473,0.000010518256,0.000009849009,0.00044836893,0.9163877,0.00023009448,0.028658863,0.053425416,0.00016143617],"about_ca_topic_score_codex":0.000008521292,"about_ca_topic_score_gemma":0.000029969391,"teacher_disagreement_score":0.8765475,"about_ca_system_score_codex":0.00013333559,"about_ca_system_score_gemma":0.000027549326,"threshold_uncertainty_score":0.61993426},"labels":[],"label_agreement":null},{"id":"W2144574033","doi":"10.1061/9780784413517.148","title":"Spatially Constrained Scheduling with Multidirectional Singularity Functions","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Singularity; Workspace; Scheduling (production processes); Computer science; Mathematical optimization; Schedule; Dimension (graph theory); Gravitational singularity; Mathematics; Artificial intelligence; Geometry; Mathematical analysis","score_opus":0.020237187328199683,"score_gpt":0.2708542371218359,"score_spread":0.2506170497936362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144574033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31512558,0.00025359445,0.6087568,0.00055015605,0.0061937724,0.0007357604,0.00006140677,0.0016714267,0.0666515],"genre_scores_gemma":[0.9804293,0.00003525334,0.018286394,0.00001894181,0.00055306155,0.00010222546,0.000045417353,0.000043546243,0.0004858571],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99782276,0.00025686683,0.00034729482,0.0003948289,0.00068529235,0.0004929709],"domain_scores_gemma":[0.99805915,0.00023208832,0.00006038623,0.0003602218,0.0010610643,0.00022706193],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00082258944,0.0002345936,0.00024032244,0.00048154988,0.00062868703,0.00023196169,0.00016725824,0.00020368297,0.00091337715],"category_scores_gemma":[0.00024781283,0.00021926338,0.00007311737,0.0005142421,0.0011363366,0.00036324203,0.000030992884,0.00081122166,0.00027346966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002990475,0.00011801875,0.037682768,0.0002442029,0.00048381163,0.000013768598,0.00019361985,0.039350174,0.023349993,0.20989588,0.008502706,0.679866],"study_design_scores_gemma":[0.0061745066,0.00067663187,0.012148844,0.00053316966,0.00013467265,0.0017410243,0.002253146,0.66616726,0.024675582,0.011082821,0.2723717,0.0020406202],"about_ca_topic_score_codex":0.000074992065,"about_ca_topic_score_gemma":0.00027395372,"teacher_disagreement_score":0.6778254,"about_ca_system_score_codex":0.00014770839,"about_ca_system_score_gemma":0.00017325355,"threshold_uncertainty_score":0.99999994},"labels":[],"label_agreement":null},{"id":"W2145109616","doi":"10.1061/(asce)cp.1943-5487.0000199","title":"Automated Real-Time Monitoring System to Measure Shift Production of Tunnel Construction Projects","year":2012,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Calgary","funders":"","keywords":"Productivity; Measure (data warehouse); Interface (matter); Production (economics); Plan (archaeology); Computer science; User interface; Management system; Construction management; Real-time computing; Engineering; Database; Civil engineering; Operations management","score_opus":0.010468377703278884,"score_gpt":0.2132118205383111,"score_spread":0.2027434428350322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145109616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.976684,0.00017862898,0.017317122,0.000011270161,0.004782751,0.0001416758,5.6917014e-7,0.00044564405,0.0004383585],"genre_scores_gemma":[0.98670876,0.00000884389,0.012422715,4.1285136e-7,0.0008237188,0.0000024017208,4.0956806e-7,0.000030570864,0.0000021654007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986492,0.000030834377,0.00069772196,0.0000868157,0.00027932576,0.00025613516],"domain_scores_gemma":[0.99938697,0.00004628209,0.00019125841,0.0001108839,0.0001675452,0.000097063195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068281096,0.00016082247,0.00031440344,0.00054536306,0.000029058046,0.000022341852,0.00009810533,0.00009646664,0.0000022090342],"category_scores_gemma":[0.00009637474,0.00016417465,0.000069342226,0.0005371585,0.000011013349,0.00033651927,0.000014728304,0.0002709611,0.000003332305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000129012515,0.000017126404,0.012165575,0.00036914455,0.00005448243,0.0000022757122,0.0015085521,0.88591963,0.09706673,0.0002630537,0.000055864548,0.002564685],"study_design_scores_gemma":[0.00078327337,0.00012604355,0.17797238,0.006178907,0.000081430735,0.0012507547,0.00157819,0.73190486,0.07943109,0.000006884456,0.00011915479,0.0005670303],"about_ca_topic_score_codex":0.000007854615,"about_ca_topic_score_gemma":0.0000018380254,"teacher_disagreement_score":0.1658068,"about_ca_system_score_codex":0.00031171643,"about_ca_system_score_gemma":0.000030738083,"threshold_uncertainty_score":0.6694848},"labels":[],"label_agreement":null},{"id":"W2145294919","doi":"","title":"Integrating Decision Support System (DSS) and Building Information Modeling (BIM) to Optimize the Selection of Sustainable Building Components","year":2015,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Multiple-criteria decision analysis; Decision support system; Sustainability; Conceptual design; TOPSIS; Engineering; Systems engineering; Sustainable design; Building design; Integrated design; Computer science; Risk analysis (engineering); Management science; Process management; Construction engineering; Architectural engineering; Operations research; Operations management; Civil engineering; Business; Scheduling (production processes)","score_opus":0.0072608382084449336,"score_gpt":0.216921002667138,"score_spread":0.20966016445869307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145294919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47768256,0.000021591306,0.52137417,0.00009241872,0.0004249696,0.00015581779,0.0000012766118,0.0000647975,0.00018237652],"genre_scores_gemma":[0.8853449,0.000021953827,0.11457137,0.000013946203,0.000029749684,0.000009115314,0.000002732092,0.000005567436,6.3748297e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815553,0.000028019653,0.0012868532,0.0000545735,0.0002940849,0.00018094847],"domain_scores_gemma":[0.9982587,0.000044318807,0.00052977365,0.0001034184,0.0010027345,0.00006107244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096340256,0.00013949163,0.0002525881,0.0019231878,0.00010966364,0.000103339444,0.00016014048,0.00021983613,0.0000029994571],"category_scores_gemma":[0.00035815517,0.00011442006,0.000042798143,0.0009873251,0.00006383689,0.0033963493,0.000044352033,0.00042776545,0.0000023281498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015840166,0.000008627574,0.002822515,0.00014987272,0.000050591312,0.0000012785852,0.0014541697,0.62142587,0.0025366412,0.15585078,0.00013104694,0.21541019],"study_design_scores_gemma":[0.0012564514,0.00018187259,0.00019862092,0.00039282723,0.000031934313,0.0019273104,0.054749273,0.91982305,0.01500843,0.0055362447,0.000718057,0.00017594935],"about_ca_topic_score_codex":0.000032001335,"about_ca_topic_score_gemma":0.000003650462,"teacher_disagreement_score":0.40766236,"about_ca_system_score_codex":0.00049920875,"about_ca_system_score_gemma":0.000096486234,"threshold_uncertainty_score":0.46659145},"labels":[],"label_agreement":null},{"id":"W2145599564","doi":"10.1109/iis.1997.645279","title":"Development of an object oriented framework for the simulation of earth moving operations","year":2002,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Graphical user interface; Object-oriented programming; Interface (matter); Object (grammar); Object-oriented modeling; Systems engineering; Visualization; Human–computer interaction; Software engineering; Engineering; Programming language; Artificial intelligence; Operating system","score_opus":0.019160052085981618,"score_gpt":0.2431395510051827,"score_spread":0.22397949891920108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145599564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19543955,0.000024866718,0.80371547,0.000009285575,0.000118109994,0.000108696935,0.0000020402135,0.000037607075,0.00054438267],"genre_scores_gemma":[0.84655064,0.0000023862647,0.15333763,0.000005840128,0.000019709438,0.000014547197,0.000003536856,0.000004449736,0.00006123557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996887,0.0000043830237,0.0001650165,0.000040658026,0.00005713,0.000044127042],"domain_scores_gemma":[0.99976295,0.00006270823,0.000013972828,0.00007966473,0.00007027702,0.000010442176],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000043000855,0.000038741073,0.00004757644,0.000029628594,0.00005989966,0.0000072745083,0.000031402888,0.00003407104,0.0002044958],"category_scores_gemma":[0.000026828538,0.000027827253,0.000017962479,0.000094082214,0.000010962087,0.00008579873,0.0000026924267,0.00003341566,0.0000017331074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023014022,0.000012213816,0.00004970026,0.000012936868,0.000021770855,7.4191013e-9,0.0014954694,0.88767755,0.0032693525,0.032432973,0.0000069729595,0.075018756],"study_design_scores_gemma":[0.00006677203,0.000010008481,0.0005122609,0.000010246217,0.000005281767,2.1289766e-7,0.00045379018,0.96778345,0.029877545,0.00011188958,0.0011343866,0.000034153945],"about_ca_topic_score_codex":0.0000035273194,"about_ca_topic_score_gemma":0.000083224404,"teacher_disagreement_score":0.6511111,"about_ca_system_score_codex":0.000005896701,"about_ca_system_score_gemma":0.0000065784902,"threshold_uncertainty_score":0.22390856},"labels":[],"label_agreement":null},{"id":"W2145704802","doi":"10.1061/9780784412329.130","title":"Integrating Building Information Modeling with Universal Design Requirements for Highly Accessible Homes","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Adaptability; Universal design; Computer science; Process (computing); Population; Architectural engineering; Built environment; Systems engineering; Design process; Software engineering; Engineering; World Wide Web; Work in process; Civil engineering; Operations management","score_opus":0.0717595086824617,"score_gpt":0.3276354536967646,"score_spread":0.2558759450143029,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145704802","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05613145,0.00037101933,0.93763405,0.00005796989,0.0016982624,0.00063887186,0.000016625892,0.00030828294,0.0031434628],"genre_scores_gemma":[0.92594916,0.00007088801,0.073371835,0.000008677421,0.00027525533,0.00018414261,0.000031320185,0.000028527787,0.00008017137],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99830306,0.00010437329,0.00034357718,0.00014828784,0.0004750631,0.00062565913],"domain_scores_gemma":[0.9985936,0.00015160465,0.00007596234,0.00020059347,0.00079569756,0.0001825425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093192805,0.00018830603,0.00017437243,0.0005873746,0.00043568265,0.00028528724,0.00019056138,0.00014485233,0.00010288797],"category_scores_gemma":[0.000106575324,0.00016616477,0.00004504025,0.0004932404,0.00019248133,0.0059164725,0.000036276448,0.00037060847,0.00002605646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005089512,0.000048880112,0.0069301743,0.0004939948,0.00035819114,0.0000012048644,0.0012702208,0.06488516,0.011477399,0.3616596,0.0063916356,0.5459746],"study_design_scores_gemma":[0.002077704,0.0001716866,0.00016884241,0.00039660238,0.000059314625,0.00009754054,0.00748044,0.9369824,0.030528368,0.0030228565,0.018352695,0.00066153624],"about_ca_topic_score_codex":0.00003179398,"about_ca_topic_score_gemma":0.000010868878,"teacher_disagreement_score":0.87209725,"about_ca_system_score_codex":0.00027218089,"about_ca_system_score_gemma":0.00011197055,"threshold_uncertainty_score":0.67760026},"labels":[],"label_agreement":null},{"id":"W2146323859","doi":"10.1061/40794(179)18","title":"From Architectural Sketch to Feasible Structural System Solution","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University; Hôpital Notre-Dame","funders":"","keywords":"Sketch; Process (computing); Conceptual design; Architectural design; Computer science; Engineering design process; Software engineering; Architectural engineering; Architecture; Engineering; Systems engineering; Human–computer interaction; Mechanical engineering; Programming language","score_opus":0.006980508684538688,"score_gpt":0.20373259911387478,"score_spread":0.19675209042933609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146323859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92059547,0.000060293434,0.06333252,0.00028607846,0.00082447263,0.00010255585,0.000011519936,0.0007376097,0.014049477],"genre_scores_gemma":[0.98728484,4.0066777e-7,0.011722852,0.00003918269,0.00060142035,0.000011284021,0.000012570916,0.000010621786,0.0003168474],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952793,0.000008459929,0.00013203315,0.000104010636,0.00009113879,0.00013643384],"domain_scores_gemma":[0.9997862,0.0000083979,0.00000867484,0.0001102061,0.000021989004,0.00006452036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000019769439,0.00009018483,0.0000770092,0.00005898897,0.000046781508,0.00003990389,0.00006267607,0.000046938905,0.00028223166],"category_scores_gemma":[0.0000024656063,0.00007660178,0.000032827626,0.000092567076,0.000007925493,0.00010914139,0.000008890866,0.00007671344,0.00030160823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029154211,0.000003977198,0.0010927401,0.00004162424,0.00006908857,0.0000012747148,0.0013011995,0.07704585,0.053937104,0.020239089,0.008894527,0.83734435],"study_design_scores_gemma":[0.0005343886,0.000035127403,0.017911742,0.00006294648,0.000024440966,0.00010327568,0.0010462413,0.89642024,0.069579214,0.0006695368,0.013091083,0.0005217714],"about_ca_topic_score_codex":0.00022861961,"about_ca_topic_score_gemma":0.00044860327,"teacher_disagreement_score":0.83682257,"about_ca_system_score_codex":0.00012762462,"about_ca_system_score_gemma":0.000005837765,"threshold_uncertainty_score":0.3876664},"labels":[],"label_agreement":null},{"id":"W2151848589","doi":"10.1139/l09-026","title":"A novel solution for construction on-site communication – the information booth","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of Calgary","funders":"University of Calgary","keywords":"Unavailability; Productivity; Construction management; Information and Communications Technology; Information technology; Engineering; Engineering management; Computer science; Construction engineering; Transport engineering; Civil engineering; Reliability engineering; World Wide Web","score_opus":0.006703936349958971,"score_gpt":0.17273312767731944,"score_spread":0.16602919132736046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151848589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077109346,0.00038187118,0.98643965,0.0009501081,0.0011417253,0.00017342031,0.000022689432,0.00005247362,0.0031271165],"genre_scores_gemma":[0.9965748,0.000022122902,0.0031434305,0.00010208103,0.00012951528,0.0000048129887,0.000010185423,0.0000073104957,0.0000056981985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948525,0.0000049111723,0.00026560493,0.000028160932,0.00007873543,0.00013735543],"domain_scores_gemma":[0.9995284,0.000033537388,0.00007694432,0.000112076836,0.00014437572,0.00010467896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016245565,0.000084353815,0.000085599946,0.00024775797,0.00011005393,0.000081236976,0.00010767431,0.000060212114,0.000014940753],"category_scores_gemma":[0.000056474433,0.00007306608,0.00005244703,0.00013321155,0.000020127647,0.0004858253,0.0000010145301,0.00018789347,0.0000032185385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019722942,0.0000055802248,0.00006211055,0.000043558044,0.000062922576,6.742956e-7,0.001299658,0.72555053,0.009663958,0.06977147,0.009665583,0.18385424],"study_design_scores_gemma":[0.0015026806,0.00030237608,0.0073995027,0.00040785206,0.000078325495,0.0007454679,0.00035583737,0.6452548,0.003900489,0.0021308665,0.33744645,0.00047534093],"about_ca_topic_score_codex":0.00006283484,"about_ca_topic_score_gemma":0.005383038,"teacher_disagreement_score":0.9888639,"about_ca_system_score_codex":0.0001745046,"about_ca_system_score_gemma":0.00009622744,"threshold_uncertainty_score":0.30038616},"labels":[],"label_agreement":null},{"id":"W2152933467","doi":"10.1061/(asce)0733-9364(2005)131:3(360)","title":"Quantifying Engineering Project Scope for Productivity Modeling","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scope (computer science); Rework; Work breakdown structure; Productivity; Computer science; Statement of work; Project management; Systems engineering; Estimation; Engineering management; Project planning; Engineering; Risk analysis (engineering); Management science; Project charter; Business","score_opus":0.018504629679681514,"score_gpt":0.22978327418486275,"score_spread":0.21127864450518125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152933467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15997441,0.001250129,0.83651346,0.00009885607,0.0015119788,0.00026686318,0.000002226751,0.00016881504,0.00021322753],"genre_scores_gemma":[0.85263515,0.00076332525,0.14600694,0.0000053229865,0.00051421876,0.00002392094,0.0000011088465,0.000027875478,0.000022148119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992171,0.0000046094806,0.00037300197,0.00010940725,0.00013079536,0.00016510497],"domain_scores_gemma":[0.99969125,0.000015914706,0.00006538347,0.00008405794,0.00009438569,0.00004901551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023780603,0.00014876554,0.0001856026,0.00037717225,0.000046832865,0.000060949125,0.000060428807,0.000049464084,0.0000027782908],"category_scores_gemma":[0.000019148953,0.0001475231,0.00007363138,0.00014934153,0.000011930431,0.00040278316,0.000011482509,0.00015211433,6.2643136e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001241414,0.000007097053,0.00002261233,0.0003479746,0.00012499417,0.000001241433,0.000059900023,0.8711082,0.002372424,0.009185273,0.00013452698,0.11662338],"study_design_scores_gemma":[0.0004905849,0.000033547745,0.000059023252,0.00017651556,0.00006849004,0.0003187501,0.00012488032,0.9677963,0.001935827,0.000035929424,0.02877748,0.00018265493],"about_ca_topic_score_codex":8.0537654e-7,"about_ca_topic_score_gemma":0.0000012200888,"teacher_disagreement_score":0.69266075,"about_ca_system_score_codex":0.00007582401,"about_ca_system_score_gemma":0.000011114265,"threshold_uncertainty_score":0.6015817},"labels":[],"label_agreement":null},{"id":"W2153602116","doi":"10.1061/9780784412329.114","title":"Assessing Productivity Improvement of Quick Connection Systems in the Steel Construction Industry Using Building Information Modeling (BIM)","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Productivity; Building information modeling; Schedule; Work (physics); Engineering; Construction industry; Computer science; Construction engineering; Manufacturing engineering; Mechanical engineering; Scheduling (production processes); Operations management","score_opus":0.08006876967882427,"score_gpt":0.34362589806443095,"score_spread":0.2635571283856067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153602116","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9452938,0.0006728798,0.04693178,0.000054222546,0.0051130517,0.0008310268,0.000013962886,0.00011499163,0.00097431353],"genre_scores_gemma":[0.99733496,0.000039682298,0.0019466551,0.0000056147746,0.000513889,0.0001167769,0.0000150876285,0.00002153351,0.000005819423],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970362,0.0004122477,0.0008360277,0.00021452735,0.0008640448,0.0006369409],"domain_scores_gemma":[0.9983487,0.00015420963,0.0002324862,0.00038188702,0.0007677956,0.00011493144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031512645,0.00023429394,0.00029001673,0.00088244566,0.0003691438,0.0003724234,0.00020861198,0.00041105814,0.000044168064],"category_scores_gemma":[0.00022342587,0.00020853271,0.00006655866,0.0010883899,0.000414469,0.006547226,0.000052498723,0.0013555216,0.000006823843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001281922,0.00018239321,0.05845993,0.0014250616,0.00022888076,0.0000017611865,0.0023189054,0.27951196,0.15340228,0.115683295,0.00030537447,0.38835198],"study_design_scores_gemma":[0.0016626489,0.000104430714,0.004770717,0.0007826619,0.0000875959,0.0008728601,0.076306984,0.8700119,0.040189143,0.0015475227,0.0028551433,0.0008083405],"about_ca_topic_score_codex":0.00039962336,"about_ca_topic_score_gemma":0.000020830748,"teacher_disagreement_score":0.5905,"about_ca_system_score_codex":0.00048697586,"about_ca_system_score_gemma":0.00015587764,"threshold_uncertainty_score":0.8503717},"labels":[],"label_agreement":null},{"id":"W2154572638","doi":"10.1139/cjce-2013-0192","title":"Analysis of rigging assembly for lifting heavy industrial modules","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; PCL Construction (Canada); University of Alberta","funders":"","keywords":"Engineering; Engineering drawing; Computer science","score_opus":0.011863337256502616,"score_gpt":0.1892268188010503,"score_spread":0.17736348154454767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154572638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3341694,0.0005086851,0.662047,0.000054889613,0.0017758071,0.000076520286,0.000024409801,0.000041558993,0.0013017285],"genre_scores_gemma":[0.998559,0.0000050684266,0.0010281687,0.0000065475233,0.00036829186,0.000002269921,0.0000035028581,0.000020113259,0.000007020217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922216,0.000011699848,0.0004097074,0.00005935756,0.00009409186,0.00020297283],"domain_scores_gemma":[0.9993379,0.00011358849,0.00009885677,0.00008843536,0.00013864962,0.00022255226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040699015,0.00010505161,0.00029757942,0.00094467954,0.00003923934,0.000037519356,0.00011389957,0.00009137101,0.00003387831],"category_scores_gemma":[0.00026833967,0.00011152576,0.00018612438,0.0004632472,0.000012869152,0.00014883044,0.000002042399,0.00017913987,3.4349878e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037784982,0.0000011842316,0.0018467889,0.000031716743,0.0004244636,0.0000011107402,0.00012820563,0.9822062,0.0011719195,0.001627071,0.00030418963,0.0122533245],"study_design_scores_gemma":[0.0003457075,0.000043080818,0.0021138168,0.00013790073,0.00037682903,0.00001797475,0.00007225964,0.9803075,0.0025997201,0.000068782065,0.013744933,0.00017146656],"about_ca_topic_score_codex":0.00019761003,"about_ca_topic_score_gemma":0.02088958,"teacher_disagreement_score":0.6643896,"about_ca_system_score_codex":0.00010171697,"about_ca_system_score_gemma":0.00009317079,"threshold_uncertainty_score":0.9969766},"labels":[],"label_agreement":null},{"id":"W2156011880","doi":"10.1139/cjce-2014-0313","title":"From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Animation; Lift (data mining); Modular programming; Computer science; Modular design; Process (computing); Engineering drawing; Computer animation; Computer graphics (images); Engineering; Operating system; Programming language","score_opus":0.03083602972281139,"score_gpt":0.24916137637725275,"score_spread":0.21832534665444137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156011880","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33547747,0.0037007658,0.65410894,0.00017550186,0.0037826847,0.00034924547,0.00006392548,0.0006932575,0.001648242],"genre_scores_gemma":[0.9581385,0.0000028969655,0.041075222,0.000029412728,0.00067629665,0.000014262436,0.000007872327,0.000044546265,0.0000109725615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908864,0.000010998119,0.00038847412,0.00010027599,0.00011942225,0.000292167],"domain_scores_gemma":[0.9988441,0.0000382905,0.000059065198,0.00010464813,0.00027396693,0.0006799592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029438693,0.00015904909,0.0002593986,0.0003252689,0.00006198253,0.00009290071,0.0001480908,0.00007722488,0.000007731535],"category_scores_gemma":[0.0002729736,0.00016369541,0.00005829151,0.00021848873,0.000012473974,0.00032754798,0.0000051751113,0.00018516561,0.0000020017421],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056896433,0.0000025876095,0.00014830453,0.00005620157,0.00012023836,0.000008426151,0.0038779809,0.9865322,0.0012182933,0.00036562094,0.004322928,0.0033415204],"study_design_scores_gemma":[0.00031398758,0.00009480487,0.00019582457,0.00015589621,0.000030334948,0.0000738746,0.002827864,0.9909493,0.00077677675,0.00012515558,0.00423313,0.00022309806],"about_ca_topic_score_codex":0.00034033236,"about_ca_topic_score_gemma":0.008088283,"teacher_disagreement_score":0.62266105,"about_ca_system_score_codex":0.00033699413,"about_ca_system_score_gemma":0.00020841257,"threshold_uncertainty_score":0.66753054},"labels":[],"label_agreement":null},{"id":"W2156128289","doi":"10.1061/(asce)0742-597x(2004)20:1(25)","title":"In-House Delivery of Multiple-Small Reconstruction Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Public Health","funders":"","keywords":"Scope (computer science); Dilemma; Integrated project delivery; Outsourcing; Prioritization; Business; Operations management; Process management; Procurement; Engineering management; Risk analysis (engineering); Project management; Engineering; Marketing; Computer science; Systems engineering","score_opus":0.010534095056898223,"score_gpt":0.1843697805794448,"score_spread":0.17383568552254658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156128289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9763993,0.00033378787,0.020376509,0.000007870723,0.0012251469,0.00011313149,3.074185e-7,0.00003625981,0.0015077026],"genre_scores_gemma":[0.9859015,0.0003741337,0.013651869,0.0000039083975,0.00003215232,0.0000045267275,9.2308746e-8,0.000017860466,0.000013960281],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992831,0.000012773771,0.00044054014,0.000054212476,0.00009580469,0.00011360845],"domain_scores_gemma":[0.9997778,0.000025144334,0.000073373114,0.00006787789,0.00003368675,0.00002212418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021721097,0.00008728649,0.00014792304,0.00062130904,0.00000513715,0.000009044477,0.00006415849,0.0000443574,0.000011528888],"category_scores_gemma":[0.000024213039,0.00009081405,0.00004607485,0.00027974567,0.000006819355,0.00022914234,0.0000056700956,0.00017419584,0.0000013184684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020141273,0.000039468072,0.010019319,0.0003918946,0.00008857055,0.000052225885,0.00025434478,0.9421739,0.00490497,0.003387972,0.00006750432,0.038599703],"study_design_scores_gemma":[0.012074579,0.00038173326,0.06258623,0.004054605,0.00020654601,0.0014939973,0.0064996188,0.7750941,0.11380209,0.0016619246,0.02050722,0.0016373843],"about_ca_topic_score_codex":0.000003746415,"about_ca_topic_score_gemma":0.000015768366,"teacher_disagreement_score":0.16707982,"about_ca_system_score_codex":0.00010610445,"about_ca_system_score_gemma":0.0000074977997,"threshold_uncertainty_score":0.37032896},"labels":[],"label_agreement":null},{"id":"W2156344559","doi":"10.5555/2429759.2430112","title":"Simulation of mobile falsework utilization methods in bridge construction","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bridge (graph theory); Engineering; Construction engineering; Shoring; Construction management; Sequence (biology); Civil engineering; Computer science; Structural engineering","score_opus":0.06989636271862627,"score_gpt":0.3584415132555854,"score_spread":0.2885451505369591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156344559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18898386,0.00013936553,0.8078324,0.00000477108,0.0007940246,0.0001970792,0.000005390582,0.0001177611,0.0019253198],"genre_scores_gemma":[0.9888596,0.000012223082,0.010926264,0.000010488958,0.000098207274,0.000025119722,0.000028781136,0.000016233986,0.000023062217],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989841,0.00009838629,0.0004864366,0.00012892169,0.00012890743,0.00017325616],"domain_scores_gemma":[0.99926883,0.00023349302,0.00010229401,0.00016509801,0.00018129015,0.000049013594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023954948,0.00013817291,0.00018610494,0.00021991428,0.000027694183,0.000024021398,0.00006722404,0.00013858158,0.0003868747],"category_scores_gemma":[0.00007905242,0.00014860611,0.000047788195,0.0003340263,0.000055430963,0.0006074531,0.000012547215,0.00013148566,0.000016948428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001063912,0.000016091306,0.019637998,0.000025898513,0.0000086509535,3.8984005e-8,0.0007137816,0.8069775,0.0013497841,0.0027242198,0.0000043089294,0.1685311],"study_design_scores_gemma":[0.00024013869,0.000016982562,0.03685399,0.00005704853,0.000010669573,0.0000013920479,0.00017826656,0.9552869,0.005191277,0.0007451344,0.0012781548,0.00014001287],"about_ca_topic_score_codex":0.000008737589,"about_ca_topic_score_gemma":0.00001003375,"teacher_disagreement_score":0.79987574,"about_ca_system_score_codex":0.00006903262,"about_ca_system_score_gemma":0.000016455993,"threshold_uncertainty_score":0.60599816},"labels":[],"label_agreement":null},{"id":"W2156710275","doi":"10.5555/1162708.1162978","title":"Representation and analysis of spatial resources in construction simulation","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Representation (politics); Computer science; Space (punctuation); Discrete event simulation; Productivity; Theoretical computer science; Industrial engineering; Data science; Simulation; Engineering","score_opus":0.018695832496966318,"score_gpt":0.26642566720633365,"score_spread":0.24772983470936732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156710275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66998994,0.000026142276,0.32862875,0.000029300141,0.00009301891,0.00007252252,0.000006354647,0.00005043185,0.0011035057],"genre_scores_gemma":[0.99885607,0.000008811719,0.0010153916,0.0000094472925,0.000045411613,0.0000047479425,0.000029894907,0.000005863589,0.000024387557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927384,0.000035339122,0.00035041696,0.00014846347,0.000117171214,0.0000747938],"domain_scores_gemma":[0.99957305,0.00010095545,0.00007504731,0.000114308736,0.000112188995,0.00002445142],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000712448,0.00008671862,0.00017020684,0.000461839,0.0000211791,0.000033489352,0.000038012928,0.00007167905,0.00020667323],"category_scores_gemma":[0.00003189379,0.00009341467,0.00004261283,0.00044492976,0.000053438394,0.00031040353,0.000008701179,0.00007205908,0.000003174876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016526465,0.0000048649467,0.04569528,0.000005781324,0.000046976093,8.94361e-8,0.000712647,0.8111502,0.000552354,0.00042524684,0.0000011401257,0.14138892],"study_design_scores_gemma":[0.00020384917,0.00000885136,0.15944548,0.000014863962,0.00006061605,5.301467e-7,0.00013643804,0.8389413,0.0007424001,0.00019961166,0.00017487329,0.00007121316],"about_ca_topic_score_codex":0.000046368517,"about_ca_topic_score_gemma":0.00038380668,"teacher_disagreement_score":0.32886606,"about_ca_system_score_codex":0.000036059715,"about_ca_system_score_gemma":0.000006082389,"threshold_uncertainty_score":0.38093394},"labels":[],"label_agreement":null},{"id":"W2156885087","doi":"10.1061/9780784412329.032","title":"Continuous Process Planning and Controlling Techniques for Construction Productivity Performance Enhancement","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Productivity; Mainstream; Documentation; Objectivity (philosophy); Process (computing); Accountability; Process management; Control (management); Knowledge management; Computer science; Engineering; Management science; Political science; Economics; Artificial intelligence","score_opus":0.031137011344921767,"score_gpt":0.32280438448980214,"score_spread":0.2916673731448804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156885087","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.897745,0.0034862445,0.08811088,0.00012778715,0.0035084193,0.0018352722,0.000022227894,0.0005824316,0.004581753],"genre_scores_gemma":[0.9891402,0.00018514026,0.008844909,0.000007798108,0.0007563376,0.0008142044,0.000016253238,0.000036727542,0.00019841501],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99811924,0.00009615333,0.0003782151,0.00030967584,0.0003924218,0.0007042831],"domain_scores_gemma":[0.998621,0.00015435313,0.00009516034,0.00021967717,0.0007169029,0.000192899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011881272,0.00023257692,0.00029245886,0.00036047734,0.0004942572,0.00013799212,0.00011403071,0.00018807087,0.00007952491],"category_scores_gemma":[0.00013567154,0.00022980916,0.000040416777,0.00029243648,0.00070064917,0.001474267,0.00002942855,0.00046139443,0.000009784627],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017914764,0.000042600015,0.038187988,0.00054630265,0.00009981715,4.471063e-7,0.00044915907,0.00007248189,0.030348646,0.009212003,0.00084696565,0.92001444],"study_design_scores_gemma":[0.0016707776,0.00033051908,0.003209202,0.0004447262,0.000074302036,0.00054581725,0.0029044098,0.012479182,0.89000845,0.0019975062,0.08545892,0.0008762025],"about_ca_topic_score_codex":0.0000040134023,"about_ca_topic_score_gemma":0.0000017399677,"teacher_disagreement_score":0.91913825,"about_ca_system_score_codex":0.0001257927,"about_ca_system_score_gemma":0.000059688617,"threshold_uncertainty_score":0.93713456},"labels":[],"label_agreement":null},{"id":"W2157566671","doi":"10.2118/141043-ms","title":"Implementing Craft Productivity to Improve Project Performance","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Productivity; Craft; Computer science; Geography; Economics","score_opus":0.018211384153464558,"score_gpt":0.2206185972517135,"score_spread":0.20240721309824894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157566671","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8742837,0.0000066713637,0.011327833,0.00002261562,0.00047939736,0.0002368341,0.0000017744632,0.00036046212,0.11328076],"genre_scores_gemma":[0.99289775,0.0000018803973,0.005692464,0.000014996543,0.00009230757,0.00005619593,9.2999755e-7,0.000009252686,0.001234247],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99956703,0.0000037144239,0.00009822051,0.000105035346,0.00005157449,0.00017440006],"domain_scores_gemma":[0.9998221,0.0000018075258,0.000008900351,0.00011373825,0.000031473584,0.00002198254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009153686,0.000065528875,0.000049172115,0.00005340848,0.00004766712,0.00001345027,0.000045985915,0.000020223675,0.00022020999],"category_scores_gemma":[0.000005160178,0.00005635235,0.000015993188,0.000115206654,0.000006802798,0.00018701806,0.00001714264,0.000056504465,0.000062204046],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015122514,0.000024817185,0.020082064,0.00009955186,0.00003853396,4.5211974e-7,0.002061796,0.000045556095,0.10233675,0.004164272,0.004588548,0.8665425],"study_design_scores_gemma":[0.00015453648,0.00010299094,0.01842455,0.000011606299,0.000009995618,0.000011388771,0.00043442732,0.0089209275,0.91601324,0.00011931018,0.055508908,0.00028814192],"about_ca_topic_score_codex":0.00006413383,"about_ca_topic_score_gemma":0.000093945695,"teacher_disagreement_score":0.8662544,"about_ca_system_score_codex":0.00001981161,"about_ca_system_score_gemma":0.000009997679,"threshold_uncertainty_score":0.24111448},"labels":[],"label_agreement":null},{"id":"W2157838605","doi":"10.1155/2014/672896","title":"An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Embodied energy; Sustainability; Energy consumption; Certification; Systems engineering; Environmental design; Energy modeling; Building design; Conceptual design; Sustainable design; Architectural engineering; Design tool; Computer science; Life-cycle assessment; Engineering; Civil engineering; Operations management; Production (economics); Human–computer interaction","score_opus":0.012402703447853028,"score_gpt":0.2478339491887843,"score_spread":0.23543124574093127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157838605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36910918,0.000045228837,0.63009775,0.0000147812025,0.0003040074,0.00008490287,6.1113764e-7,0.00027819397,0.00006535101],"genre_scores_gemma":[0.8495319,0.000014356605,0.15026477,0.000012296487,0.00013551272,0.0000046050195,5.2839096e-7,0.000028510467,0.0000075044672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989727,0.000028517568,0.00044259703,0.00012460431,0.00018728683,0.00024425474],"domain_scores_gemma":[0.99917614,0.0000633544,0.00010482334,0.00011757894,0.000344691,0.00019341768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036488147,0.00018211865,0.00026269633,0.0005338101,0.000079919766,0.00014102524,0.00010696718,0.0001068772,0.00000712121],"category_scores_gemma":[0.00010364959,0.00018134256,0.00004752855,0.00036762055,0.000030284293,0.0007969233,0.000011443002,0.00022974575,7.829661e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015693377,0.0000048148554,0.00013690743,0.00005258723,0.000041871128,0.0000040126897,0.00014255056,0.9641034,0.021835204,0.010225259,0.000045242596,0.0033924468],"study_design_scores_gemma":[0.00036016066,0.00012697084,0.00021647861,0.00007022061,0.000032619533,0.00038892642,0.0003243042,0.9902655,0.0072930832,0.00030025904,0.00042435044,0.0001971256],"about_ca_topic_score_codex":0.000002615015,"about_ca_topic_score_gemma":7.5877966e-7,"teacher_disagreement_score":0.48042274,"about_ca_system_score_codex":0.00011643011,"about_ca_system_score_gemma":0.000055194225,"threshold_uncertainty_score":0.73949355},"labels":[],"label_agreement":null},{"id":"W2157892415","doi":"","title":"CONVR2006 Visualizing Crane Selection and Operation in Virtual Environment","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Animation; Virtual machine; Virtual reality; Selection (genetic algorithm); Inverse kinematics; Kinematics; Computer animation; Human–computer interaction; Artificial intelligence; Robot; Computer graphics (images)","score_opus":0.00301493584589587,"score_gpt":0.1733729118679741,"score_spread":0.17035797602207822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157892415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8753082,0.000095434036,0.11604209,0.00003392494,0.00011323078,0.00008029579,7.360073e-7,0.00012140842,0.0082046455],"genre_scores_gemma":[0.99916697,0.000027941505,0.00041995317,0.000012072779,0.00005099523,0.000010510608,0.000008371137,0.000006015688,0.00029720023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997013,0.000008150183,0.00011135422,0.00007040524,0.000045946035,0.00006282635],"domain_scores_gemma":[0.9999508,0.000005674045,0.0000059603763,0.000023326082,0.000003776443,0.000010462699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000035648696,0.000052840827,0.00004477004,0.000054844462,0.000024733408,0.00002545386,0.000009519102,0.000041272953,0.00019696607],"category_scores_gemma":[7.2312486e-7,0.000052702784,0.0000067417195,0.000040603583,0.0000092877,0.00012092313,0.0000024171213,0.000046657315,0.00001757703],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014985469,0.0000519979,0.023048542,0.00002409939,0.000014062118,0.0000016545359,0.00022804667,0.383855,0.35663193,0.13257974,0.0013302913,0.10221966],"study_design_scores_gemma":[0.00063958537,0.000054406944,0.028668024,0.000011122453,0.0000062954496,0.00002723209,0.0002227864,0.8939919,0.068378225,0.00068266597,0.007090923,0.000226852],"about_ca_topic_score_codex":0.00016105433,"about_ca_topic_score_gemma":0.00041094513,"teacher_disagreement_score":0.5101369,"about_ca_system_score_codex":0.000046753994,"about_ca_system_score_gemma":0.0000023332584,"threshold_uncertainty_score":0.21566403},"labels":[],"label_agreement":null},{"id":"W2159071750","doi":"10.2165/00115677-200210020-00008","title":"The Development of a Tool to Assess Quality of Cost Estimates","year":2002,"lang":"en","type":"article","venue":"Disease Management & Health Outcomes","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute of Health Economics","funders":"Canadian Blood Services","keywords":"Medicine; Health care; Pharmacoeconomics; Quality (philosophy); Productivity; Unit (ring theory); Estimation; Cost estimate; Ambulatory care; Public health; Pharmacy; Unit cost; Nursing","score_opus":0.06470458835416765,"score_gpt":0.33681053797341665,"score_spread":0.272105949619249,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159071750","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81746024,0.0021764312,0.15147635,0.0066161347,0.0018917628,0.0038911395,0.000117388714,0.00058576243,0.015784808],"genre_scores_gemma":[0.9931431,0.00007556481,0.006110879,0.00023510485,0.000007171372,0.00014901756,0.000007882724,0.000009893163,0.00026141002],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989912,0.0000235618,0.00051259255,0.00009266316,0.00021833913,0.00016163908],"domain_scores_gemma":[0.99951583,0.0000608973,0.00007761196,0.00021613797,0.000035142508,0.0000943527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024601613,0.00009317865,0.00016622289,0.00006368465,0.00009914479,0.00001735449,0.000118313415,0.000011526433,0.0000587017],"category_scores_gemma":[0.000027290143,0.00006894838,0.00004814443,0.00013480826,0.000019884532,0.000045752975,0.00003044579,0.000033519154,0.000018774801],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003439025,0.0001064085,0.120321564,0.0022895013,0.00024823818,0.0000010589197,0.0009478615,0.0023821369,0.000014256611,0.07874755,0.004829925,0.7900771],"study_design_scores_gemma":[0.0002811118,0.000008777696,0.975817,0.00006263505,0.000016512466,5.1077212e-8,0.00048071687,0.0034308245,0.00008249597,0.00030438858,0.019386955,0.00012852286],"about_ca_topic_score_codex":0.000007423436,"about_ca_topic_score_gemma":0.000034920362,"teacher_disagreement_score":0.85549545,"about_ca_system_score_codex":0.000075258526,"about_ca_system_score_gemma":0.000017194685,"threshold_uncertainty_score":0.2811633},"labels":[],"label_agreement":null},{"id":"W2159096491","doi":"10.5539/mas.v2n6p41","title":"Effective Resources Management in Construction Industries for Success","year":2008,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Business; Profit (economics); Productivity; Control (management); Quality (philosophy); Product (mathematics); Environmental economics; Process (computing); Operations management; Computer science; Economics; Economic growth","score_opus":0.01009847185842623,"score_gpt":0.2095554180421051,"score_spread":0.19945694618367887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159096491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7445246,0.000029425168,0.22829352,0.000015659934,0.00023712798,0.0004581783,0.0000024843207,0.00013174284,0.026307276],"genre_scores_gemma":[0.9969521,0.000010584178,0.0026940657,0.000011899938,0.000031055617,0.0002546526,0.0000010915052,0.0000060762895,0.000038445352],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937856,0.000003270006,0.00011177082,0.0001827669,0.00015541702,0.00016818364],"domain_scores_gemma":[0.99980825,0.000017452327,0.000017558441,0.00009901657,0.000027343194,0.000030379384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012451636,0.00007601162,0.00007462641,0.00018926227,0.00017788888,0.000034458,0.00012836751,0.000041714608,0.000004477358],"category_scores_gemma":[0.0000046977543,0.000074849704,0.000011482183,0.00047388225,0.00037385742,0.00016191418,0.00001679174,0.000082455845,0.0000043727587],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058557802,0.000023011818,0.00417105,0.000061096136,0.000017975248,0.0000029333357,0.0028751786,0.024130259,0.061599985,0.078477815,0.0001903353,0.8283918],"study_design_scores_gemma":[0.0020887805,0.000056332727,0.06932962,0.000055556167,0.000020250453,0.00007482482,0.0021325594,0.6879081,0.19906196,0.032425277,0.0061036726,0.0007430446],"about_ca_topic_score_codex":0.0000052921096,"about_ca_topic_score_gemma":0.000009529941,"teacher_disagreement_score":0.82764876,"about_ca_system_score_codex":0.00009494339,"about_ca_system_score_gemma":0.000014696585,"threshold_uncertainty_score":0.30522823},"labels":[],"label_agreement":null},{"id":"W2159421027","doi":"10.7492/ijaec.2013.008","title":"A Weather Generator for Use in Construction Simulation Models","year":2013,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Generator (circuit theory); Computer science; Meteorology; Environmental science; Geography; Physics; Power (physics)","score_opus":0.007503177386820845,"score_gpt":0.19802012193507604,"score_spread":0.19051694454825518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159421027","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4976856,0.000108223416,0.5006274,0.00005974475,0.001346522,0.00009842057,0.0000060461193,0.00003651115,0.00003151681],"genre_scores_gemma":[0.91538304,0.00005169144,0.08413677,0.000015336862,0.00036763234,0.000017003047,0.0000044920257,0.000017841396,0.0000061775268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927133,0.00001106031,0.00036569693,0.00009226745,0.0001523774,0.00010723878],"domain_scores_gemma":[0.9994589,0.00008511672,0.000085289925,0.000051094034,0.0002680643,0.000051503805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000072165705,0.00012596372,0.00014002957,0.0004214584,0.000020207173,0.00010955017,0.00007075416,0.00008779656,0.000017877292],"category_scores_gemma":[0.000038906703,0.00011854486,0.00006404793,0.00008828636,0.000035026223,0.0005910825,0.000006819381,0.00019178525,7.4766206e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023131639,0.000004660501,0.00059319433,0.00001147059,0.0000594471,9.762038e-7,0.0001155482,0.824092,0.0047143013,0.0034880457,0.000018400324,0.16687888],"study_design_scores_gemma":[0.00075481785,0.00003721601,0.0011449334,0.000085078624,0.000014828601,0.0005154465,0.000109018314,0.9871853,0.0014262997,0.0072087385,0.0013670427,0.00015129871],"about_ca_topic_score_codex":0.000011589528,"about_ca_topic_score_gemma":0.000005917005,"teacher_disagreement_score":0.41769746,"about_ca_system_score_codex":0.00007406657,"about_ca_system_score_gemma":0.000016741906,"threshold_uncertainty_score":0.48341188},"labels":[],"label_agreement":null},{"id":"W2159559240","doi":"","title":"U.S. and Canada Railroads","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Feature (linguistics); Class (philosophy); Generalization; Set (abstract data type); Computer science; Base (topology); Artificial intelligence; Mathematics; Linguistics; Programming language","score_opus":0.004495868400710243,"score_gpt":0.14301556985293465,"score_spread":0.13851970145222442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159559240","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89254725,0.00011385189,0.0016826809,0.00006730538,0.00023879077,0.000012652657,6.6409416e-7,0.00008287938,0.10525391],"genre_scores_gemma":[0.9987557,0.00003312027,0.00019669451,0.000041279513,0.00001621041,9.3239896e-7,4.7387755e-7,0.0000017220652,0.0009538598],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99990904,6.520745e-7,0.000023894409,0.000018342032,0.00002137355,0.000026712523],"domain_scores_gemma":[0.9999583,0.0000020427763,0.0000010530161,0.000019495204,0.0000044928734,0.000014658392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000002929352,0.000017876504,0.000016644562,0.0000057741227,0.00001700247,0.0000017738153,0.0000069426906,0.000008459462,0.00011625438],"category_scores_gemma":[6.7801074e-7,0.00001549189,0.0000022655006,0.000012119898,0.00000675961,0.000019911009,9.727995e-7,0.000016840908,0.0000022617974],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032571738,0.0000043343675,0.08066447,0.000028525745,0.000046770616,0.000025035844,0.00029447908,0.0012643805,0.004628643,0.045998238,0.66697246,0.20006943],"study_design_scores_gemma":[0.0004389874,0.0000139623035,0.13983613,0.0000060853804,0.0000059888375,0.00064085494,0.000292907,0.03360695,0.023435712,0.0004189303,0.8009302,0.0003732634],"about_ca_topic_score_codex":0.16274829,"about_ca_topic_score_gemma":0.54951304,"teacher_disagreement_score":0.38676473,"about_ca_system_score_codex":0.000009950938,"about_ca_system_score_gemma":0.000015132041,"threshold_uncertainty_score":0.842827},"labels":[],"label_agreement":null},{"id":"W2162237076","doi":"10.1061/9780784412329.011","title":"A Decision-Support Model Utilizing a Linear Cost Optimization Approach for Heavy Equipment Selection","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Earthworks; Visual Basic for Applications; Task (project management); Selection (genetic algorithm); Computer science; Operations research; Decision support system; Renting; Heavy equipment; Linear programming; Industrial engineering; Systems engineering; Engineering; Civil engineering; Data mining","score_opus":0.07869549746287131,"score_gpt":0.34664906066889806,"score_spread":0.26795356320602676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162237076","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033846726,0.00038019908,0.9848789,0.000036218087,0.0020183448,0.0012158134,0.00004280843,0.00036481273,0.007678229],"genre_scores_gemma":[0.46679673,0.00020289546,0.53001666,0.000025616833,0.0007618197,0.0012425173,0.00016278369,0.00008343413,0.00070755684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99766105,0.00009519433,0.00047370943,0.00032229326,0.0006224416,0.0008253067],"domain_scores_gemma":[0.99833745,0.00015877023,0.00007138704,0.0002643216,0.0008456076,0.00032246002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012122305,0.00023823016,0.00024124524,0.00054391584,0.0004907795,0.00013753203,0.00017243082,0.00027585635,0.00040597626],"category_scores_gemma":[0.0001544321,0.00024220791,0.00010906193,0.0005947271,0.000251647,0.0012805772,0.00004967817,0.00048115925,0.00003419219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021225923,0.000099899546,0.0009975142,0.00013776566,0.0000909412,2.2261115e-7,0.0002075391,0.74255925,0.0014068767,0.020334737,0.011268986,0.222684],"study_design_scores_gemma":[0.000685765,0.00004490161,0.000029925755,0.000031775126,0.0000221256,0.000088348774,0.0004966391,0.98415184,0.00357831,0.0002925524,0.010329789,0.00024805064],"about_ca_topic_score_codex":0.0000073660663,"about_ca_topic_score_gemma":0.000005973312,"teacher_disagreement_score":0.46341208,"about_ca_system_score_codex":0.00037303756,"about_ca_system_score_gemma":0.00014682906,"threshold_uncertainty_score":0.9876952},"labels":[],"label_agreement":null},{"id":"W2162239134","doi":"10.1108/14714171111124149","title":"House construction CO<sub>2</sub> footprint quantification: a BIM approach","year":2011,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Carbon footprint; Greenhouse gas; Framing (construction); Building information modeling; Construction industry; Engineering; Architectural engineering; Process (computing); Originality; Civil engineering; Environmental science; Computer science; Construction engineering; Compatibility (geochemistry)","score_opus":0.03518559669408424,"score_gpt":0.2161228232726665,"score_spread":0.18093722657858224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162239134","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55604076,0.00004148535,0.42445529,0.000027006383,0.0025111714,0.0003511508,0.000013424138,0.0016403121,0.0149193965],"genre_scores_gemma":[0.9688254,0.000072747505,0.030394694,0.000034146626,0.0002997263,0.00016984738,0.00011687531,0.0000734293,0.000013153839],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9980357,0.00005600934,0.00088171184,0.00043083596,0.00029748306,0.0002982404],"domain_scores_gemma":[0.9986175,0.000018468989,0.00026886322,0.00044195956,0.0005820186,0.00007123874],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002661394,0.00032034476,0.00025457446,0.0008460504,0.00025936548,0.00010288372,0.00015367779,0.00031434232,0.000096680786],"category_scores_gemma":[0.000043828313,0.0003583903,0.00008109373,0.0019026399,0.00040371696,0.0005268042,0.000016487791,0.00038821585,0.00015377077],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037894108,0.000042973985,0.0037566465,0.00007185676,0.00007858886,8.233227e-7,0.00029105102,0.000259476,0.14833845,0.5418953,0.00040081583,0.30482617],"study_design_scores_gemma":[0.0010068996,0.00006976237,0.011097484,0.000052968793,0.000065389046,0.0008170967,0.00206109,0.008385359,0.9534159,0.018140938,0.0040435125,0.0008436262],"about_ca_topic_score_codex":0.0000091787,"about_ca_topic_score_gemma":0.0000040238606,"teacher_disagreement_score":0.80507743,"about_ca_system_score_codex":0.00018182235,"about_ca_system_score_gemma":0.000076924094,"threshold_uncertainty_score":0.9998868},"labels":[],"label_agreement":null},{"id":"W2162271698","doi":"","title":"SAIT Polytechnic | Calgary AB | Timberframing at Sait","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Geography","score_opus":0.004180664526994387,"score_gpt":0.1699745760838083,"score_spread":0.16579391155681392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162271698","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53034866,0.00046257267,0.039954264,0.00016990221,0.00083823083,0.00026499556,0.000002101858,0.0017912211,0.42616805],"genre_scores_gemma":[0.98657244,0.000025704574,0.0027027046,0.00010800454,0.00007241881,0.000037820104,0.0000072610396,0.00001974244,0.010453876],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995528,0.0000043118184,0.000129358,0.000091686336,0.00007673231,0.00014512222],"domain_scores_gemma":[0.9997684,0.000011872709,0.00001017826,0.0001369801,0.000022374516,0.00005023403],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000020441132,0.00009059664,0.000071559145,0.000051683972,0.000047235477,0.00003052641,0.000060435686,0.000087427885,0.0067741885],"category_scores_gemma":[0.000003398994,0.00008005631,0.00003492825,0.000090577334,0.000019898562,0.00014903072,0.000017409677,0.00009911684,0.0020645512],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040085756,0.000018102155,0.003403577,0.000055181787,0.00007186964,0.000002976287,0.00011449884,0.00078879885,0.1625295,0.030905645,0.16936134,0.6327445],"study_design_scores_gemma":[0.0010346865,0.00009483915,0.065306954,0.00009593284,0.00005824367,0.0003350433,0.00042144567,0.4311045,0.17597891,0.004931479,0.31903324,0.0016047179],"about_ca_topic_score_codex":0.00018427502,"about_ca_topic_score_gemma":0.000064641376,"teacher_disagreement_score":0.63113976,"about_ca_system_score_codex":0.000087830274,"about_ca_system_score_gemma":0.0000050172503,"threshold_uncertainty_score":0.9987125},"labels":[],"label_agreement":null},{"id":"W2163340299","doi":"10.1139/l07-048","title":"Equipment workspace analysis in infrastructure projects","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workspace; Bridge (graph theory); Computer science; Constructive; Key (lock); Representation (politics); Construction engineering; Flexibility (engineering); Risk analysis (engineering); Systems engineering; Engineering; Civil engineering; Robot; Process (computing); Business; Computer security; Artificial intelligence","score_opus":0.004661458230198203,"score_gpt":0.18176360873067757,"score_spread":0.17710215050047937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163340299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48246902,0.0024658693,0.50405574,0.00008539382,0.0022576014,0.0001213875,0.0000051482584,0.00006433446,0.00847548],"genre_scores_gemma":[0.998455,0.000014137755,0.0013549232,0.000011530325,0.00013024322,8.25831e-7,0.0000012287028,0.000014168267,0.000017973898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99925154,0.0000042040615,0.00031011013,0.0000560254,0.00010487386,0.00027325226],"domain_scores_gemma":[0.99952555,0.00001998926,0.00004135589,0.00007788708,0.000057710626,0.00027748977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024167563,0.00010691516,0.00017636307,0.0014324808,0.000018023145,0.000036846966,0.00009995691,0.00008579038,0.00013835303],"category_scores_gemma":[0.000032386324,0.00010941079,0.000081889724,0.0010354671,0.000011143635,0.00014835312,0.000002246804,0.00031747262,0.000001284205],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021137048,0.0000010455357,0.020669933,0.000017265986,0.00014192106,0.00008286294,0.00052858447,0.9725047,0.00038695647,0.00068744406,0.00044213486,0.004535076],"study_design_scores_gemma":[0.001396765,0.00010818894,0.6531988,0.000589963,0.00043491734,0.0006402316,0.0021501535,0.2885434,0.0029757225,0.0005511094,0.048224483,0.0011862785],"about_ca_topic_score_codex":0.00021455884,"about_ca_topic_score_gemma":0.258453,"teacher_disagreement_score":0.6839613,"about_ca_system_score_codex":0.00037405788,"about_ca_system_score_gemma":0.00013863186,"threshold_uncertainty_score":0.7550783},"labels":[],"label_agreement":null},{"id":"W2163787508","doi":"10.1139/l11-025","title":"Schematic cost estimating model for super tall buildings using a high-rise premium ratio","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schematic; Cost estimate; Unit cost; Productivity; Cost database; Computer science; Industrial engineering; Engineering; Economics; Systems engineering; Mechanical engineering","score_opus":0.021321499207405045,"score_gpt":0.1958483158564268,"score_spread":0.17452681664902175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163787508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10720303,0.0002701786,0.8911249,0.000009353577,0.0009252178,0.00014597425,0.0000107277,0.00004210799,0.00026852242],"genre_scores_gemma":[0.85747343,0.000002205488,0.14225419,0.000009209384,0.00018726279,0.000011311785,0.0000013890294,0.00004463211,0.000016357584],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991045,0.000004259947,0.0004166437,0.0000824028,0.00009433597,0.0002978825],"domain_scores_gemma":[0.99929464,0.000024193727,0.00007794874,0.00010384258,0.00016832355,0.0003310447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017437729,0.00016352833,0.00021708767,0.00033007943,0.0000823405,0.000061369356,0.00013863298,0.0000914313,0.00008231506],"category_scores_gemma":[0.00010610379,0.00017511014,0.000091266185,0.00013255849,0.00002003321,0.00043809102,0.0000038012415,0.00021737622,0.0000012929956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002372508,0.0000019895053,0.000080423255,0.00012464538,0.000046235535,0.000005550629,0.000886284,0.9898387,0.0057063797,0.002417065,0.000278181,0.0006121267],"study_design_scores_gemma":[0.0002656006,0.000017196508,0.00003134278,0.000264592,0.000048500144,0.00015388569,0.000059329806,0.9961832,0.002144104,0.0004569423,0.0001947372,0.00018056174],"about_ca_topic_score_codex":0.0002336068,"about_ca_topic_score_gemma":0.004916427,"teacher_disagreement_score":0.7502704,"about_ca_system_score_codex":0.00025092327,"about_ca_system_score_gemma":0.00025181152,"threshold_uncertainty_score":0.7140784},"labels":[],"label_agreement":null},{"id":"W2163804292","doi":"10.1139/cjce-2014-0079","title":"Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Welding; Productivity; Schedule; Engineering; Computer science; Mechanical engineering","score_opus":0.019833775053201462,"score_gpt":0.25749811356283314,"score_spread":0.23766433850963167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163804292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9641872,0.00069063617,0.033921536,0.000012291382,0.00091864966,0.000083875086,0.000010726452,0.000043174332,0.00013192336],"genre_scores_gemma":[0.9996111,0.0000066670573,0.00013090286,0.0000022918377,0.0002206291,0.0000026292844,0.000001070737,0.000020414198,0.0000043336604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993126,0.000036257083,0.00031939978,0.00008883921,0.000101886435,0.00014101587],"domain_scores_gemma":[0.99916744,0.00014424906,0.00012198909,0.00009970721,0.00029967094,0.00016692957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025032394,0.00014362749,0.00026557627,0.00059993984,0.000062190324,0.00003137547,0.000031935248,0.00006522911,0.000009764005],"category_scores_gemma":[0.0002600191,0.00012941675,0.00008030224,0.00026650526,0.000023081338,0.00022486798,0.0000015445033,0.00016397508,4.6193156e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010115215,0.0000024864967,0.0012502006,0.00020729234,0.00013547346,0.000020115493,0.00015179707,0.99202985,0.0033597848,0.000157562,0.000027635064,0.0026476819],"study_design_scores_gemma":[0.00046248123,0.0003146034,0.011296874,0.00045505873,0.00010664013,0.0007143903,0.00047554294,0.9831637,0.0026744397,0.000013531761,0.00014352301,0.00017919965],"about_ca_topic_score_codex":0.0003798043,"about_ca_topic_score_gemma":0.013245794,"teacher_disagreement_score":0.035423875,"about_ca_system_score_codex":0.00039711045,"about_ca_system_score_gemma":0.00010069234,"threshold_uncertainty_score":0.7391464},"labels":[],"label_agreement":null},{"id":"W2164919587","doi":"","title":"Toronto Takes Off","year":2004,"lang":"en","type":"article","venue":"Civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Redevelopment; International airport; Terminal (telecommunication); Engineering; Transport engineering; Civil engineering; State (computer science); Architectural engineering; Computer science; Telecommunications","score_opus":0.004255881539214431,"score_gpt":0.17003143846295957,"score_spread":0.16577555692374513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164919587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1696678,0.013386709,0.6508731,0.00009945214,0.005740884,0.00025281543,0.000011411923,0.0046857214,0.1552821],"genre_scores_gemma":[0.99805003,0.00007843263,0.0015716495,0.000010542786,0.0001808888,0.000016088861,0.0000034214634,0.00002560148,0.00006333839],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996049,0.0000010247329,0.00010563633,0.00007619432,0.000068882335,0.00014335653],"domain_scores_gemma":[0.9998164,0.0000054693805,0.000005989922,0.000108884444,0.000014702612,0.000048556467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000023566161,0.000099395045,0.00007516901,0.0000278917,0.000020087124,0.000023009867,0.000059165774,0.00005323396,0.00016516472],"category_scores_gemma":[0.0000074831723,0.00010646881,0.000035340367,0.00006274825,0.000006532284,0.00019862117,0.0000035780704,0.00007487078,0.000044718796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011385947,0.000007100159,0.000042842614,0.000052432468,0.000034716883,0.000003939542,0.00036962866,0.9123454,0.024016408,0.029780343,0.00057169516,0.032774337],"study_design_scores_gemma":[0.0024790065,0.0001162219,0.009237364,0.00048187663,0.00007360017,0.00027419926,0.0010093644,0.3976235,0.11018809,0.0019827797,0.47428545,0.0022485564],"about_ca_topic_score_codex":0.00002381904,"about_ca_topic_score_gemma":0.0004243991,"teacher_disagreement_score":0.82838225,"about_ca_system_score_codex":0.00015655834,"about_ca_system_score_gemma":0.000007369511,"threshold_uncertainty_score":0.4341672},"labels":[],"label_agreement":null},{"id":"W2165255956","doi":"10.1139/l06-022","title":"Factors affecting buildability of building designs","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Respondent; Key (lock); Engineering; Construction engineering; Sustainable development; Questionnaire; Linear discriminant analysis; Risk analysis (engineering); Transport engineering; Computer science; Business; Mathematics; Artificial intelligence; Statistics","score_opus":0.011818510156577556,"score_gpt":0.18676635050816787,"score_spread":0.1749478403515903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165255956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85025364,0.00060270145,0.1472289,0.0000063899934,0.00086291396,0.000036009336,0.0000049136547,0.000032206237,0.00097234163],"genre_scores_gemma":[0.9988199,0.0000022644667,0.0009820965,0.0000011900207,0.00016723463,4.4144178e-7,7.6685916e-7,0.000020870422,0.000005235604],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992789,0.000009187152,0.00035871382,0.000054074946,0.00009578109,0.00020332004],"domain_scores_gemma":[0.9995171,0.00006290596,0.00007330352,0.000082166305,0.00009674521,0.0001678114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017156672,0.00011920665,0.00019134965,0.0003418696,0.000034747925,0.000026484096,0.000103375016,0.00006984768,0.00007621097],"category_scores_gemma":[0.000074751486,0.000116554664,0.00010240773,0.00021297905,0.000022254933,0.0001789286,0.000002112402,0.00020890479,3.1613328e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011151018,0.0000031595264,0.021229956,0.000101047306,0.00004556318,0.000008611404,0.00026490388,0.9336763,0.04107559,0.002071353,0.00037393783,0.0011484722],"study_design_scores_gemma":[0.0015925629,0.00030472773,0.3416944,0.0016097572,0.00026195915,0.00064201653,0.0016535613,0.19235586,0.4423057,0.0036125223,0.012066782,0.0019001403],"about_ca_topic_score_codex":0.00079362444,"about_ca_topic_score_gemma":0.025558237,"teacher_disagreement_score":0.74132043,"about_ca_system_score_codex":0.00018518545,"about_ca_system_score_gemma":0.000116152005,"threshold_uncertainty_score":0.9922228},"labels":[],"label_agreement":null},{"id":"W2166536971","doi":"10.5555/1162708.1162971","title":"Modeling scheduling uncertainty in capital construction projects","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Scheduling (production processes); Monte Carlo method; Work (physics); Inflation (cosmology); Cost accounting; Operations research; Industrial engineering; Engineering; Economics; Operations management; Accounting","score_opus":0.025572965103551195,"score_gpt":0.24786615402994097,"score_spread":0.22229318892638977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166536971","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.64647084,0.000037669437,0.35079208,0.000051129227,0.0003015309,0.00010380769,0.0000020442228,0.0001726017,0.0020682795],"genre_scores_gemma":[0.9954814,0.000009448264,0.004260618,0.000026316302,0.0001541163,0.000015305432,0.000012870644,0.000012461018,0.000027514594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992571,0.000018794775,0.0002889393,0.00016787657,0.0001112678,0.00015606261],"domain_scores_gemma":[0.9996954,0.000020310134,0.000023112867,0.00011179075,0.000113256036,0.00003613818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006907036,0.0001255204,0.000111524896,0.00016112818,0.000037488106,0.000065870816,0.000066805835,0.00009117453,0.0001690506],"category_scores_gemma":[0.000020245092,0.00013291859,0.000033079286,0.00014054468,0.000028706452,0.0004519342,0.000009944068,0.00018334064,0.000046081743],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008043675,0.0000053427248,0.00073387293,0.000011252513,0.000005520978,2.9664326e-7,0.0007787925,0.94759107,0.0005020351,0.0035278709,0.0000018200363,0.046834104],"study_design_scores_gemma":[0.0003017794,0.000008175106,0.00014176338,0.00006809468,0.0000036702752,0.000005433524,0.0006214924,0.9975162,0.0003821892,0.0006669947,0.00013798749,0.00014619097],"about_ca_topic_score_codex":0.000026675089,"about_ca_topic_score_gemma":0.00031338725,"teacher_disagreement_score":0.3490105,"about_ca_system_score_codex":0.00012223925,"about_ca_system_score_gemma":0.00003353957,"threshold_uncertainty_score":0.5420263},"labels":[],"label_agreement":null},{"id":"W2166792774","doi":"10.1061/9780784412329.140","title":"Structural Steel Fabrication Special Purpose Simulation","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Set (abstract data type); Productivity; Computer science; Fabrication; Manufacturing engineering; Industrial engineering; Simulation modeling; Systems engineering; Process management; Engineering drawing; Engineering; Programming language","score_opus":0.05320733784896644,"score_gpt":0.3312695568173818,"score_spread":0.2780622189684154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166792774","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8864174,0.0023060609,0.01652969,0.00015601069,0.028571332,0.0012341627,0.0000647301,0.001001681,0.063718945],"genre_scores_gemma":[0.9926868,0.00006552866,0.0008921853,0.000009562579,0.0053800214,0.000071552146,0.000045684956,0.000035635076,0.00081302493],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99790496,0.00018973576,0.00037194742,0.00021975859,0.00065709424,0.00065649673],"domain_scores_gemma":[0.99846214,0.00016538166,0.00006238895,0.00033278836,0.00070754293,0.0002697478],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00055075396,0.00019990899,0.00017990317,0.00045958254,0.00036018604,0.00015609947,0.00017889217,0.00021491844,0.002773944],"category_scores_gemma":[0.00015777898,0.000200524,0.00007303934,0.000598652,0.00040892375,0.0017848775,0.000042544612,0.000551579,0.0005280698],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071545364,0.000029750041,0.034806848,0.00007927545,0.00008496895,0.0000013267373,0.00051191665,0.008993432,0.0040561254,0.070356146,0.01699717,0.8640115],"study_design_scores_gemma":[0.001985575,0.000102808415,0.12452004,0.00010311863,0.00006901764,0.0002474902,0.0025396338,0.17038305,0.015226581,0.0069036414,0.6765921,0.0013269043],"about_ca_topic_score_codex":0.000009345338,"about_ca_topic_score_gemma":0.0000140925795,"teacher_disagreement_score":0.8626846,"about_ca_system_score_codex":0.00025514205,"about_ca_system_score_gemma":0.00004962427,"threshold_uncertainty_score":0.99813765},"labels":[],"label_agreement":null},{"id":"W21669223","doi":"10.1016/j.jinf.2011.05.015","title":"A Layered Approach for Planning Releases under Uncertain Capacities.","year":2009,"lang":"en","type":"article","venue":"Software Engineering and Knowledge Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science","score_opus":0.01480296806451505,"score_gpt":0.21737391622697158,"score_spread":0.20257094816245652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W21669223","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036548626,0.007805476,0.95220786,0.00000953187,0.0006718424,0.00023691758,0.000020335301,0.002101681,0.00039771694],"genre_scores_gemma":[0.9236042,0.00006934358,0.07552432,0.000014830462,0.00041452923,0.000106901956,0.00004666395,0.0000806387,0.00013855613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989352,0.0000055484934,0.00027178976,0.00026657406,0.00009206262,0.00042882652],"domain_scores_gemma":[0.9994624,0.00013663326,0.000020104853,0.00017215194,0.000057825415,0.00015086608],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010627385,0.00034830894,0.0002896953,0.00025860665,0.00009016553,0.00007296747,0.000107099455,0.00017858509,0.000004787003],"category_scores_gemma":[0.00011415606,0.00037710211,0.00009402521,0.00025016294,0.000021455397,0.00018633188,0.000011589168,0.0002764009,0.000002524078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007353316,0.000015850921,0.000058294612,0.00033867013,0.000060628674,0.0000015761347,0.0006008246,0.97820514,0.0025225568,0.0052422145,0.0006693657,0.012277493],"study_design_scores_gemma":[0.00052342453,0.00006531714,0.0007291576,0.00019285873,0.000031422995,0.00005826277,0.00025042784,0.9871154,0.0017338208,0.000100479425,0.00860546,0.0005939926],"about_ca_topic_score_codex":0.0000022366264,"about_ca_topic_score_gemma":4.2334187e-7,"teacher_disagreement_score":0.8870556,"about_ca_system_score_codex":0.000103019134,"about_ca_system_score_gemma":0.000021405012,"threshold_uncertainty_score":0.9998681},"labels":[],"label_agreement":null},{"id":"W2167484719","doi":"10.1061/9780784412329.020","title":"A Framework for Construction Strategy Formulation and Visualization","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Adaptation (eye); Visualization; Plan (archaeology); Scheduling (production processes); Project management; Work (physics); Representation (politics); Management science; Project planning; Process management; Operations research; Systems engineering; Engineering; Artificial intelligence; Operations management","score_opus":0.063021331179069,"score_gpt":0.3706618633868529,"score_spread":0.3076405322077839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167484719","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2166998,0.0028025506,0.7679032,0.00012482022,0.0059198854,0.0013426006,0.000062128995,0.00062724075,0.0045178006],"genre_scores_gemma":[0.97703385,0.000305297,0.021393824,0.000010828153,0.00078173896,0.00024651396,0.000059237736,0.000043261945,0.00012546178],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9984057,0.00011053431,0.0003483381,0.00022123611,0.00035287498,0.0005613031],"domain_scores_gemma":[0.9986877,0.00027740753,0.00006983275,0.00020115796,0.00053712534,0.00022677488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006596656,0.00018719974,0.00018431846,0.00042992452,0.00039694324,0.00017492835,0.00008066358,0.00030758543,0.00028377943],"category_scores_gemma":[0.000188816,0.00019425516,0.000044920263,0.00044386787,0.000375322,0.0015192869,0.000024251804,0.00033910607,0.00003030209],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031347223,0.000012126805,0.004797701,0.00009427861,0.000033390275,1.0124836e-7,0.00011866412,0.00007999379,0.0021490108,0.71658486,0.00087844656,0.2752201],"study_design_scores_gemma":[0.0045542754,0.00062982447,0.028944114,0.00060328294,0.00022628951,0.0012129783,0.011010854,0.105196536,0.109384745,0.4535444,0.2821988,0.0024938802],"about_ca_topic_score_codex":0.000007197535,"about_ca_topic_score_gemma":0.000008706607,"teacher_disagreement_score":0.7603341,"about_ca_system_score_codex":0.00012425134,"about_ca_system_score_gemma":0.00004546391,"threshold_uncertainty_score":0.79214954},"labels":[],"label_agreement":null},{"id":"W2167786059","doi":"10.1061/41109(373)37","title":"State-Based Simulation Mechanism for Facilitating Project Schedule Updating","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Schedule; Scheduling (production processes); Discrete event simulation; Project management; Industrial engineering; Process (computing); Operations research; Distributed computing; Systems engineering; Simulation; Engineering; Operations management","score_opus":0.015350360960934157,"score_gpt":0.25773890528645865,"score_spread":0.2423885443255245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167786059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2853521,0.0000012710425,0.71127135,0.000014754629,0.00037524002,0.00021983344,0.000012533241,0.00034267773,0.0024102714],"genre_scores_gemma":[0.87400675,9.902374e-8,0.12573789,0.000027446282,0.00004458271,0.0000638022,0.00002296129,0.00001285734,0.0000836404],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995645,0.0000056428726,0.00015333446,0.00009427855,0.00006689193,0.00011533074],"domain_scores_gemma":[0.9996727,0.0000995103,0.00002055154,0.00008164561,0.00010601651,0.000019574354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009741903,0.000077198885,0.000059492228,0.00006333975,0.00007335463,0.000041886728,0.000035167628,0.000054841043,0.00007897623],"category_scores_gemma":[0.000088878434,0.000072227886,0.00003359791,0.00007671741,0.0000090032245,0.00013916778,0.0000026568882,0.00010723088,0.0000112757125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014878392,0.000014299962,0.00020832755,0.0001369686,0.000024237557,1.5102056e-7,0.00037673864,0.33010942,0.35616803,0.1849912,0.00015232094,0.12780342],"study_design_scores_gemma":[0.00021104595,0.00001532958,0.000011506442,0.0000044636536,0.0000031988811,3.5903415e-7,0.00021598816,0.9085531,0.08641448,0.004058454,0.00042424875,0.00008779295],"about_ca_topic_score_codex":0.000013092813,"about_ca_topic_score_gemma":0.00009169934,"teacher_disagreement_score":0.58865464,"about_ca_system_score_codex":0.000014619497,"about_ca_system_score_gemma":0.000022355562,"threshold_uncertainty_score":0.29453677},"labels":[],"label_agreement":null},{"id":"W2167981124","doi":"10.5555/2431518.2431936","title":"Integration of construction and traffic engineering in simulating pipe-jacking operations in urban areas","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Jacking; Transport engineering; Plan (archaeology); Sizing; Engineering; Truck; Scheduling (production processes); Construction management; Traffic engineering; Civil engineering; Site plan; Urban planning; Regional planning; Operations management","score_opus":0.026096545429864074,"score_gpt":0.22615925140052237,"score_spread":0.20006270597065828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167981124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8306994,0.00003145559,0.16806754,0.00000560786,0.00017505568,0.00014418305,0.0000022089257,0.000079232144,0.00079534575],"genre_scores_gemma":[0.9958818,0.000007935423,0.0040344703,0.0000048406587,0.000026035295,0.000014164288,0.000010411246,0.000013407149,0.0000069401754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991458,0.00002624887,0.00045658826,0.00016164148,0.000084165324,0.00012557358],"domain_scores_gemma":[0.9996753,0.00005522761,0.000040674004,0.00010331101,0.00009443559,0.000031081345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010306303,0.00013700016,0.0001672015,0.00035476833,0.0000216537,0.000032761774,0.000054989367,0.000096250325,0.00008089667],"category_scores_gemma":[0.000058818925,0.00015009045,0.000024473102,0.00025791186,0.000041035535,0.0004611064,0.00001090926,0.0001769818,0.0000018777437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013615016,0.00001435889,0.018012457,0.00003091325,0.000007012287,7.759751e-7,0.0051640724,0.923906,0.005780147,0.0048621357,7.2150584e-7,0.04220777],"study_design_scores_gemma":[0.0004082058,0.000022988617,0.03601836,0.00020868023,0.000005008762,0.0000037962227,0.0005217117,0.9591912,0.0033443458,0.0001299613,0.000012423173,0.00013334193],"about_ca_topic_score_codex":0.000047995905,"about_ca_topic_score_gemma":0.00047240537,"teacher_disagreement_score":0.16518243,"about_ca_system_score_codex":0.000057221743,"about_ca_system_score_gemma":0.000017227301,"threshold_uncertainty_score":0.61205107},"labels":[],"label_agreement":null},{"id":"W2168057526","doi":"10.1017/s0890060403172034","title":"A feature ontology to support construction cost estimating","year":2003,"lang":"en","type":"article","venue":"Artificial intelligence for engineering design analysis and manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Computer science; Ontology; Feature (linguistics); Component (thermodynamics); Estimator; Product (mathematics); Similarity (geometry); Data mining; Artificial intelligence; Mathematics; Statistics","score_opus":0.025893494142698117,"score_gpt":0.25168374273809546,"score_spread":0.22579024859539734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168057526","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01603898,0.000047572434,0.9826183,0.000050564577,0.0006245587,0.00031622945,0.0000063369926,0.0002129708,0.00008452401],"genre_scores_gemma":[0.7398814,0.0000092371,0.25986302,0.000019556916,0.0000690134,0.00009880953,0.000009705739,0.000020468371,0.000028806586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990645,0.000015794378,0.00027963813,0.00025651685,0.00008883465,0.0002946993],"domain_scores_gemma":[0.99954826,0.00010831631,0.00003544906,0.00014109431,0.000042455446,0.00012440303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020283989,0.00020131744,0.00027003328,0.00042744874,0.00011220383,0.00011017925,0.00006946409,0.00010927795,0.000052288673],"category_scores_gemma":[0.00007616993,0.00020893729,0.00011347784,0.00031684383,0.000024895908,0.00012760096,0.000007301487,0.0001334109,0.000010571832],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008257998,0.000004628444,0.00002634152,0.0000279242,0.00021985435,0.0000012000166,0.00013967355,0.8063678,0.003762139,0.015474347,0.0000710315,0.17389677],"study_design_scores_gemma":[0.0000264664,0.00005580922,0.00004593561,0.0000124099415,0.00023486502,0.000024499748,0.00016636192,0.6500496,0.3430889,0.001990557,0.0040344694,0.00027010607],"about_ca_topic_score_codex":0.000008410077,"about_ca_topic_score_gemma":0.00004010844,"teacher_disagreement_score":0.72384244,"about_ca_system_score_codex":0.000056597553,"about_ca_system_score_gemma":0.000011102364,"threshold_uncertainty_score":0.8520215},"labels":[],"label_agreement":null},{"id":"W2168260347","doi":"10.2172/889402","title":"Process for Converting Waste Glass Fiber into Value Added Products, Final Report","year":2005,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Waste management; Tile; Pozzolan; Municipal solid waste; Glass recycling; Fiber; Glass fiber; Environmental science; Portland cement; Engineering; Cement; Materials science; Metallurgy; Composite material","score_opus":0.03099688200241368,"score_gpt":0.2825210563841249,"score_spread":0.2515241743817112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168260347","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023041226,0.0046172542,0.023857957,0.001022407,0.018169321,0.0043178154,0.00010473639,0.0036247207,0.92124456],"genre_scores_gemma":[0.3080396,0.00085828925,0.02755799,0.0001710148,0.026688889,0.003120304,0.0032224907,0.00081013126,0.62953126],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.997787,0.000010246979,0.0008867186,0.0004952257,0.000511153,0.00030964945],"domain_scores_gemma":[0.9981639,0.00002861179,0.00026309112,0.00038624406,0.0010869442,0.00007124352],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042479392,0.0003773583,0.00043813282,0.00015098577,0.00009774781,0.000051511906,0.0001436204,0.00043017778,0.0005217149],"category_scores_gemma":[0.0003532857,0.0003441325,0.00015254992,0.00018802505,0.00003978103,0.00020281757,0.0000178938,0.0003872879,0.00004170798],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005854553,0.00008049539,0.000246287,0.011707059,0.00095783675,0.00008945209,0.0006221989,0.0128955385,0.0023719943,0.0011249128,0.3039126,0.6659331],"study_design_scores_gemma":[0.00034009982,0.00003855136,0.00002822806,0.0004033983,0.00018185636,0.0013956887,0.00021485596,0.013735972,0.04706099,0.000279102,0.9355555,0.0007657232],"about_ca_topic_score_codex":0.00007857086,"about_ca_topic_score_gemma":0.000058537535,"teacher_disagreement_score":0.66516733,"about_ca_system_score_codex":0.00034756772,"about_ca_system_score_gemma":0.0008601867,"threshold_uncertainty_score":0.99990106},"labels":[],"label_agreement":null},{"id":"W2168852977","doi":"10.1061/(asce)0733-9364(2002)128:5(438)","title":"Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Artificial neural network; Computer science; Beta distribution; Probability distribution; Merge (version control); Sampling (signal processing); Artificial intelligence; Data mining; Statistics; Machine learning; Mathematics","score_opus":0.026660590404711422,"score_gpt":0.2570156965044356,"score_spread":0.2303551060997242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168852977","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027990256,0.008224814,0.9620718,0.00009584887,0.0007474448,0.00047969312,6.278803e-7,0.000101537065,0.00028801739],"genre_scores_gemma":[0.9627101,0.004921172,0.032075197,0.000038798476,0.0002028816,0.000031769687,0.0000015861275,0.000015238575,0.0000032760477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991365,0.00002596463,0.0004330391,0.00009124958,0.00020117013,0.00011208239],"domain_scores_gemma":[0.9996691,0.00001652896,0.00009793793,0.00006734993,0.000119869226,0.000029237173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036869603,0.0001217939,0.000166816,0.00015259697,0.000055697583,0.000042168682,0.000030420651,0.000049798415,0.000016782677],"category_scores_gemma":[0.000020057172,0.00011865501,0.000042043583,0.00018755867,0.000015937198,0.0002906731,0.0000075998596,0.00015335284,3.713442e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033439906,0.0000031948873,0.000007690212,0.00043283822,0.000031341773,0.0000013250082,0.000026068985,0.9028392,0.00042481496,0.0006956648,0.000053121123,0.09548143],"study_design_scores_gemma":[0.00019796933,0.000027579637,0.00001752133,0.0008439437,0.00012341523,0.000113878574,0.000035863584,0.9967102,0.00021747562,0.00022088067,0.001379882,0.00011138273],"about_ca_topic_score_codex":0.0000010920699,"about_ca_topic_score_gemma":9.1242805e-7,"teacher_disagreement_score":0.9347198,"about_ca_system_score_codex":0.00006243064,"about_ca_system_score_gemma":0.0000064227265,"threshold_uncertainty_score":0.4838611},"labels":[],"label_agreement":null},{"id":"W2168920618","doi":"10.1109/icsmc.2006.384558","title":"Computational Intelligence Techniques for Building Transparent Construction Performance Models","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Artificial neural network; Cluster analysis; Transparency (behavior); Fuzzy logic; Data mining; Artificial intelligence; Data modeling; Machine learning; Computational intelligence; Genetic algorithm; Model building; Database","score_opus":0.018744125721664187,"score_gpt":0.23262362215500385,"score_spread":0.21387949643333964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168920618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024938324,0.00004040056,0.9669626,0.00002409971,0.0002005991,0.00014231255,0.0000067079095,0.00046382262,0.007221174],"genre_scores_gemma":[0.7826723,0.0000137671395,0.21713792,0.00000767524,0.000064440406,0.000050902992,0.000016369559,0.000007555783,0.00002910203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995768,0.000002642063,0.00017580169,0.000085712854,0.0000685005,0.000090543435],"domain_scores_gemma":[0.9998508,0.000016204132,0.0000144917785,0.000042308933,0.00006223812,0.000013921058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000037130292,0.000074874624,0.000063126085,0.00006347308,0.000058734797,0.000023417615,0.00003935313,0.000045061024,0.000027049216],"category_scores_gemma":[6.195094e-7,0.00007324421,0.000031975487,0.00007188144,0.000032450534,0.00022010117,0.0000016831872,0.000046834775,0.0000018868675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028035963,0.000002992666,0.000072436495,0.000020521844,0.0000034469658,2.0426697e-8,0.000009554194,0.65631086,0.00042761705,0.20628174,0.00012115008,0.13674685],"study_design_scores_gemma":[0.000037114485,0.0000128400325,0.000062555555,0.000014277694,0.0000043229843,0.000012555811,0.00002539563,0.8761062,0.061425976,0.061519902,0.0006917715,0.00008709801],"about_ca_topic_score_codex":0.000009931832,"about_ca_topic_score_gemma":0.0000059441077,"teacher_disagreement_score":0.75773394,"about_ca_system_score_codex":0.000039721122,"about_ca_system_score_gemma":0.000008103957,"threshold_uncertainty_score":0.29868123},"labels":[],"label_agreement":null},{"id":"W2169010058","doi":"10.1061/9780784412329.085","title":"Activity-Based Data Fusion for Automated Progress Tracking of Construction Projects","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sensor fusion; Computer science; Scope (computer science); Systems engineering; Piping; Field (mathematics); Object (grammar); Identification (biology); Scalability; Engineering; Database; Artificial intelligence","score_opus":0.1224683887234326,"score_gpt":0.3809785777175685,"score_spread":0.2585101889941359,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169010058","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90555876,0.0029966375,0.06642731,0.00036973975,0.013499991,0.004052993,0.0010475877,0.0029924824,0.0030544775],"genre_scores_gemma":[0.9785347,0.000054910917,0.020392086,0.0000042290726,0.00044021755,0.00024779516,0.00023185325,0.000052316456,0.000041878226],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975636,0.00023148366,0.00046053977,0.00036625256,0.0006531439,0.0007249594],"domain_scores_gemma":[0.997615,0.00029667272,0.00016791567,0.000744692,0.00096905,0.00020668593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013805316,0.00024440506,0.00032377042,0.0006455431,0.0003190337,0.00011149941,0.0003923167,0.00029267967,0.00018271145],"category_scores_gemma":[0.00023121727,0.00024144295,0.00008225845,0.0007353094,0.0010398544,0.0018490093,0.00009209004,0.00045969788,0.000017711543],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035005814,0.00019116403,0.0329847,0.00108805,0.00019160128,0.0000011828095,0.00019873989,0.00034007215,0.03663117,0.013052083,0.010593907,0.9043773],"study_design_scores_gemma":[0.004069237,0.0002934531,0.01268432,0.0007034639,0.00016728051,0.00030958312,0.0020261495,0.59351206,0.31422678,0.00058767106,0.07030474,0.0011152915],"about_ca_topic_score_codex":0.000017631615,"about_ca_topic_score_gemma":0.000019170797,"teacher_disagreement_score":0.90326196,"about_ca_system_score_codex":0.00014386937,"about_ca_system_score_gemma":0.0002188906,"threshold_uncertainty_score":0.98457575},"labels":[],"label_agreement":null},{"id":"W2169101793","doi":"10.3141/1907-10","title":"Evaluation of Dowel Bars Installed in Airfield Concrete Pavement Construction Joints by Using Plastic Sleeves","year":2005,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Dowel; Structural engineering; Engineering; Drilling; Bar (unit); Consolidation (business); Installation; Geotechnical engineering; Forensic engineering; Mechanical engineering; Geology","score_opus":0.07483710276364233,"score_gpt":0.3494602198399551,"score_spread":0.2746231170763128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169101793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99381065,0.00045140096,0.003644652,0.0003619846,0.0006826034,0.00075673865,0.000057712467,0.000022697872,0.00021157578],"genre_scores_gemma":[0.9970473,0.00058891764,0.00211737,0.000009172277,0.000106924635,0.00004870001,0.000017287737,0.000034124292,0.000030191455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9927155,0.0009510135,0.0015840189,0.0002441693,0.0040097428,0.00049556233],"domain_scores_gemma":[0.9954105,0.0004385211,0.00032310438,0.00025725013,0.0033995563,0.00017106747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053386027,0.00020692286,0.00037364342,0.00105042,0.00019279131,0.00005750673,0.00038733552,0.00020678632,0.0005175153],"category_scores_gemma":[0.00017882966,0.0001767677,0.00020123685,0.0013589987,0.00042112498,0.00074080273,0.000003271394,0.0013633752,0.0000056270474],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016468688,0.00026792238,0.17373483,0.00073550525,0.00076856965,0.000025629299,0.007870706,0.34800306,0.27560684,0.0044242414,0.0046554618,0.18226038],"study_design_scores_gemma":[0.012577568,0.001028901,0.67530227,0.002115936,0.0004959893,0.000006620977,0.013031842,0.15266475,0.13023812,0.005370981,0.0062889457,0.0008780696],"about_ca_topic_score_codex":0.0018641263,"about_ca_topic_score_gemma":0.012978283,"teacher_disagreement_score":0.5015674,"about_ca_system_score_codex":0.00060588884,"about_ca_system_score_gemma":0.00053265016,"threshold_uncertainty_score":0.72421867},"labels":[],"label_agreement":null},{"id":"W2169188219","doi":"10.1061/9780784413517.081","title":"Testing the Application of Google Fusion Tables as a Collaborative Productivity Database and Benchmarking System for the Construction Industry","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"Google","keywords":"Benchmarking; Upload; Database; World Wide Web; Computer science; The Internet; Publication; Business","score_opus":0.028691096176073082,"score_gpt":0.29674722201503506,"score_spread":0.268056125838962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169188219","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7956537,0.0015870067,0.18806665,0.000990567,0.0041750236,0.0042433613,0.0002647693,0.00039886963,0.004620041],"genre_scores_gemma":[0.9948344,0.0000623865,0.0039828564,0.0000054379816,0.00050450035,0.00053703616,0.0000254726,0.000022175449,0.000025718555],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982411,0.00033219054,0.0003715857,0.0003447829,0.00042630543,0.00028403456],"domain_scores_gemma":[0.99665457,0.001265555,0.000188303,0.0004753861,0.001342135,0.00007402534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020817819,0.00017137763,0.00020967773,0.00018353327,0.0010074847,0.00015644972,0.00020875808,0.00019989423,0.000020503623],"category_scores_gemma":[0.0008230362,0.00011831518,0.000034453107,0.00073102914,0.0013960795,0.00032704865,0.00007785564,0.00061251654,0.000004285555],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010248309,0.00001544812,0.011656603,0.0005349926,0.000100573554,2.551737e-7,0.00023170399,0.0015433766,0.07237593,0.104846224,0.0015439548,0.80704844],"study_design_scores_gemma":[0.0021942304,0.0003916779,0.008477642,0.0008643427,0.00021383193,0.0007606342,0.026517149,0.7574822,0.10220937,0.006488645,0.093627796,0.00077253906],"about_ca_topic_score_codex":0.00020148905,"about_ca_topic_score_gemma":0.00008082335,"teacher_disagreement_score":0.8062759,"about_ca_system_score_codex":0.000096979114,"about_ca_system_score_gemma":0.00013553508,"threshold_uncertainty_score":0.774886},"labels":[],"label_agreement":null},{"id":"W2171106967","doi":"10.5555/2429759.2429834","title":"Simulation of mobile crane operations in 3D space","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Lift (data mining); Schedule; Process (computing); Computer science; Engineering; Industrial engineering; Simulation; Operations research; Artificial intelligence; Data mining","score_opus":0.020845654736853087,"score_gpt":0.26657029769668655,"score_spread":0.24572464295983346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171106967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43512824,0.00010671778,0.56045413,0.000016258959,0.0004563114,0.0001961896,0.0000068503414,0.00009291569,0.0035423925],"genre_scores_gemma":[0.9986883,0.0000057515645,0.001043605,0.000011711726,0.00007813026,0.000024386141,0.000018458988,0.000011168117,0.000118480224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993486,0.000027428145,0.00029710855,0.000087200344,0.000105884385,0.00013377657],"domain_scores_gemma":[0.9995745,0.000090837915,0.000028286066,0.00013692187,0.00012956875,0.00003988212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008602872,0.00009889856,0.00012356404,0.00013556541,0.000023407169,0.000022584627,0.0000565961,0.00007645098,0.00058377656],"category_scores_gemma":[0.000035274705,0.00010230395,0.00002929284,0.00017082789,0.00002746342,0.00050769164,0.000009268477,0.000096159405,0.000040843996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005390242,0.000019273291,0.0056441054,0.000014280204,0.0000057388993,6.0232715e-8,0.0010501067,0.977163,0.0016397008,0.0019433735,0.0000055307514,0.012509409],"study_design_scores_gemma":[0.00020925138,0.000015902247,0.005356459,0.000034957935,0.0000057856478,4.9886006e-7,0.0001489061,0.9910212,0.0017044069,0.00008210318,0.0013181224,0.00010238203],"about_ca_topic_score_codex":0.000016418688,"about_ca_topic_score_gemma":0.00004880277,"teacher_disagreement_score":0.56356007,"about_ca_system_score_codex":0.000042790685,"about_ca_system_score_gemma":0.00001425037,"threshold_uncertainty_score":0.6391944},"labels":[],"label_agreement":null},{"id":"W2171373484","doi":"10.5555/2675983.2676371","title":"Development of a distributed construction project management game with COTS in the loop","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Game programming; Game development tool; Interface (matter); User interface; Graphical user interface; Game Developer; Human–computer interaction; Game design; Game design document; Software engineering; Operating system","score_opus":0.019781264212493332,"score_gpt":0.23081850892737749,"score_spread":0.21103724471488416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171373484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55543864,0.000008442392,0.44076052,0.000032002954,0.00009504798,0.0004456831,0.0000036529077,0.000058279693,0.0031577721],"genre_scores_gemma":[0.9948506,0.0000021489132,0.004978846,0.000011945,0.000008835193,0.00008431453,0.000026320095,0.0000050859444,0.00003190523],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994311,0.000019704908,0.00023490677,0.00009487627,0.00012982581,0.000089602305],"domain_scores_gemma":[0.9997126,0.000021192644,0.000042740056,0.00011208224,0.00010011359,0.0000112928765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000049823135,0.00008838472,0.00008166177,0.000084683285,0.00002050293,0.000043470354,0.00008272225,0.000032386408,0.00011119897],"category_scores_gemma":[0.0000028181591,0.00006106636,0.000013241095,0.00019169542,0.000042434785,0.00016327221,0.000008233532,0.00007226206,0.000015600135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009155171,0.00010757734,0.017230872,0.00032519372,0.00019640184,0.0000035529602,0.01254067,0.20063663,0.0020043775,0.02603538,0.00037578185,0.740452],"study_design_scores_gemma":[0.0011766901,0.000050704024,0.09235626,0.0002953828,0.000022800312,0.000015436528,0.0066808374,0.8878475,0.0024086938,0.00072075933,0.008097165,0.00032776635],"about_ca_topic_score_codex":0.000008702818,"about_ca_topic_score_gemma":0.00004772791,"teacher_disagreement_score":0.7401242,"about_ca_system_score_codex":0.00003494131,"about_ca_system_score_gemma":0.00002069484,"threshold_uncertainty_score":0.2490214},"labels":[],"label_agreement":null},{"id":"W2171490605","doi":"10.1109/nafips.2012.6291023","title":"Modeling construction labour productivity using fuzzy logic and exploring the use of fuzzy hybrid techniques","year":2012,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Fuzzy set operations; Neuro-fuzzy; Computer science; Defuzzification; Fuzzy set; Artificial intelligence; Fuzzy classification; Machine learning; Data mining; Fuzzy number; Fuzzy control system","score_opus":0.0881530043387268,"score_gpt":0.2420936888796831,"score_spread":0.1539406845409563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171490605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87048507,0.00014799944,0.12817024,0.000026116151,0.00042246643,0.00012171198,0.000003243156,0.00021647655,0.0004066832],"genre_scores_gemma":[0.96333516,0.000086044165,0.036348287,0.00000914381,0.00017808558,0.000017446382,9.720785e-7,0.000012435597,0.000012439853],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99947727,0.000024907638,0.00017384633,0.000094555246,0.0000853829,0.00014404304],"domain_scores_gemma":[0.9997153,0.00001744013,0.000026843669,0.0001411406,0.00006836081,0.00003089206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014409829,0.00010133411,0.000104812454,0.000071724884,0.00008191391,0.000034073033,0.000033989894,0.000031492124,0.00000811038],"category_scores_gemma":[0.000024518338,0.000074103664,0.000025442632,0.0001107795,0.000067439025,0.0009794928,0.000019342115,0.000120268254,7.5458803e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027200795,0.000044907178,0.014623367,0.00023492891,0.00010660539,5.244741e-7,0.00084779476,0.10514683,0.18530948,0.20855455,0.000059893155,0.4850439],"study_design_scores_gemma":[0.00019304563,0.000032838743,0.0015305543,0.00011035574,0.00008478731,0.0005141289,0.001436856,0.45302075,0.52968913,0.011056676,0.0017894,0.0005414542],"about_ca_topic_score_codex":0.00011249492,"about_ca_topic_score_gemma":0.000007126066,"teacher_disagreement_score":0.48450243,"about_ca_system_score_codex":0.00003057552,"about_ca_system_score_gemma":0.000006843422,"threshold_uncertainty_score":0.30218598},"labels":[],"label_agreement":null},{"id":"W2171954146","doi":"","title":"Accessibility Assessment Via Workspace Estimation","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Workspace; Degrees of freedom (physics and chemistry); Process (computing); Kinematics; Computer science; Motion (physics); Motion planning; Artificial intelligence","score_opus":0.012284116226607172,"score_gpt":0.2542663783538581,"score_spread":0.24198226212725096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171954146","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13034311,0.000018836125,0.8245262,0.000047663314,0.00026093223,0.000045568722,2.870182e-7,0.00032587507,0.04443155],"genre_scores_gemma":[0.9530217,0.000009490515,0.046573173,0.000016635486,0.000026471911,0.0000106021325,0.000004296429,0.0000046056252,0.0003330151],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971056,0.0000061630813,0.00008943205,0.00006408451,0.00006993889,0.000059804963],"domain_scores_gemma":[0.9998424,0.000009034219,0.000009027665,0.000094009156,0.000021777398,0.00002372402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000032244498,0.000049030765,0.000044763434,0.000024421346,0.000047810245,0.000013338055,0.000033091623,0.000036798436,0.00041274625],"category_scores_gemma":[0.0000029223415,0.00004291125,0.000017776343,0.00008604818,0.000016866463,0.00018989219,0.0000040675013,0.000065258806,0.000040968996],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006936607,0.000060138784,0.055463027,0.000051773335,0.0000502869,0.0000043558834,0.0003445853,0.1031641,0.005051745,0.02734939,0.013068605,0.79538506],"study_design_scores_gemma":[0.00010314425,0.0000064629926,0.119368434,0.000004186629,0.0000032575688,0.000021814767,0.000027962195,0.8755252,0.0026229955,0.0016752391,0.00054727285,0.00009407192],"about_ca_topic_score_codex":0.000008860002,"about_ca_topic_score_gemma":0.000010805052,"teacher_disagreement_score":0.8226786,"about_ca_system_score_codex":0.000051286454,"about_ca_system_score_gemma":0.000010121316,"threshold_uncertainty_score":0.4519282},"labels":[],"label_agreement":null},{"id":"W2172197475","doi":"10.5539/cis.v4n2p132","title":"Service Oriented Application in Agent Based Virtual Knowledge Community","year":2011,"lang":"en","type":"article","venue":"Computer and Information Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Virtual community; Knowledge management; Cyberspace; Serviceability (structure); Knowledge sharing; The Internet; Service (business); Construct (python library); Architecture; World Wide Web; Business","score_opus":0.017919460007538197,"score_gpt":0.21691704228586875,"score_spread":0.19899758227833056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172197475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3711597,0.000005406702,0.61886024,0.000009312352,0.00025176952,0.00007441181,0.0000014168552,0.000081325124,0.009556393],"genre_scores_gemma":[0.99736404,0.0000037944224,0.0024064858,0.00019368425,0.000010448136,0.000011813794,0.0000076016627,0.0000012604232,8.560202e-7],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963903,0.000012751199,0.00015634416,0.000039819348,0.00007566251,0.00007640107],"domain_scores_gemma":[0.99969715,0.000010427567,0.000020927635,0.00011462509,0.00011815595,0.000038705784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002441999,0.00004905597,0.000041511263,0.00018906282,0.000112841175,0.000040978226,0.000119698314,0.000023005823,0.000007423251],"category_scores_gemma":[0.0000038412213,0.00004648848,0.0000061956953,0.0005886839,0.00006426107,0.002030954,0.000029304914,0.00009397304,0.00004039726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011062481,0.000049438302,0.0043656793,0.000080345446,0.0000026675984,6.502776e-8,0.025918083,0.005890837,0.00060551974,0.06282928,0.00020542555,0.9000416],"study_design_scores_gemma":[0.00016391942,0.000019154813,0.06902954,0.000010732823,7.252743e-7,0.0000020386879,0.00034432183,0.9248918,0.0011725605,0.00005949453,0.0042431923,0.000062498846],"about_ca_topic_score_codex":0.00005056675,"about_ca_topic_score_gemma":0.000040980864,"teacher_disagreement_score":0.919001,"about_ca_system_score_codex":0.000036744295,"about_ca_system_score_gemma":0.000026261754,"threshold_uncertainty_score":0.18957451},"labels":[],"label_agreement":null},{"id":"W2174622052","doi":"","title":"1.0 Introduction : Directives concernant l'exposition à la silice sur les chantiers de construction | Ministère du Travail de l'Ontario","year":2006,"lang":"fr","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Exposition (narrative); Political science; Humanities; Art; Literature","score_opus":0.004181251236417405,"score_gpt":0.17114924133966083,"score_spread":0.16696799010324342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2174622052","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8190698,0.0049541653,0.14151044,0.0034976203,0.0051966095,0.000274855,0.000032298787,0.00044423257,0.025019996],"genre_scores_gemma":[0.961784,0.0010127455,0.012037347,0.000030226596,0.003864405,0.00005443706,0.000078763194,0.00005568746,0.021082357],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983607,0.0002048206,0.0004408631,0.00037552108,0.00017930279,0.0004387698],"domain_scores_gemma":[0.9993281,0.000072645315,0.0001294261,0.00017019242,0.0001955263,0.00010416],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00028773095,0.00032091813,0.0002600316,0.00014600492,0.00025383287,0.00012967164,0.000084565494,0.00043420258,0.0014673466],"category_scores_gemma":[0.000032093834,0.00036351223,0.00014202019,0.00024774577,0.00040559037,0.00054081134,0.000011933307,0.0004290793,0.000039686598],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019520755,0.00026411543,0.06825502,0.00030532913,0.00031420102,0.000028807777,0.006342207,0.012084667,0.11750829,0.2073715,0.07047855,0.5168521],"study_design_scores_gemma":[0.0015904191,0.00021166094,0.15044805,0.00025669648,0.00040848597,0.0035362665,0.0075308923,0.02671104,0.1415103,0.0031823406,0.66352594,0.001087911],"about_ca_topic_score_codex":0.16196014,"about_ca_topic_score_gemma":0.10159652,"teacher_disagreement_score":0.5930474,"about_ca_system_score_codex":0.0016263139,"about_ca_system_score_gemma":0.0003200317,"threshold_uncertainty_score":0.9998817},"labels":[],"label_agreement":null},{"id":"W2175616469","doi":"10.3390/buildings5041265","title":"Evaluating the Alignment of Organizational and Project Contexts for BIM Adoption: A Case Study of a Large Owner Organization","year":2015,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Knowledge management; Process management; Facility management; Work (physics); Information exchange; Organizational structure; Order (exchange); Computer science; Business; Engineering; Operations management; Marketing","score_opus":0.04047435413144313,"score_gpt":0.31350886171713294,"score_spread":0.2730345075856898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2175616469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9770268,0.000057311903,0.02218658,0.000029950255,0.00010932288,0.00052396266,0.000010651566,0.000032616554,0.000022807038],"genre_scores_gemma":[0.9977984,0.0000024543972,0.0020745564,0.000009983958,0.000040855502,0.000030753148,0.00000704881,0.000013326574,0.000022624512],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995061,0.000021531694,0.0001973895,0.00007886499,0.00013813196,0.00005794587],"domain_scores_gemma":[0.99937016,0.000034319728,0.00007018782,0.00007181657,0.0004369678,0.000016565018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027092552,0.00006136061,0.00008592509,0.00004889348,0.000053621818,0.000014075575,0.000034286935,0.000030043811,0.000010791736],"category_scores_gemma":[0.00012436777,0.00003966279,0.000009548406,0.00025428788,0.000016931053,0.000071149465,0.00001531876,0.000028598204,2.764284e-7],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037251555,0.0019288189,0.27608418,0.0012718725,0.0013608496,0.00003001956,0.22134157,0.035147343,0.1475585,0.1939964,0.009301281,0.11160664],"study_design_scores_gemma":[0.03184433,0.007480764,0.013879354,0.00046620434,0.0014031533,0.0043309643,0.40295133,0.41564265,0.1079726,0.0056345384,0.0066908626,0.0017032541],"about_ca_topic_score_codex":0.00004358937,"about_ca_topic_score_gemma":0.000023721972,"teacher_disagreement_score":0.3804953,"about_ca_system_score_codex":0.00002863719,"about_ca_system_score_gemma":0.000042310894,"threshold_uncertainty_score":0.16174017},"labels":[],"label_agreement":null},{"id":"W2176047745","doi":"10.22260/isarc2013/0049","title":"Dynamic Planning of Construction Activities Using Hybrid Simulation","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Process (computing); Computer science; System dynamics; Scheduling (production processes); Representation (politics); Dimension (graph theory); Discrete event simulation; Project planning; Project management; Industrial engineering; Systems engineering; Operations research; Simulation; Engineering; Operations management; Artificial intelligence","score_opus":0.010347453201509062,"score_gpt":0.22047614149626132,"score_spread":0.21012868829475226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2176047745","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944799,0.00006217529,0.00247439,0.000015843443,0.00030053707,0.00012297962,0.0000039787124,0.00006302567,0.0024771888],"genre_scores_gemma":[0.9970447,0.0000033911044,0.0028796953,0.0000033544786,0.000024992398,0.0000054823026,6.591976e-7,0.0000121167595,0.000025617925],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999529,0.0000020173977,0.00019215094,0.0000679815,0.0001211097,0.00008772996],"domain_scores_gemma":[0.9996845,0.000019449379,0.000115377865,0.000043729677,0.00012246725,0.000014452478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042111245,0.0000802681,0.000108071996,0.0000757505,0.00004763543,0.000021631544,0.000082210805,0.00003915368,0.000038147446],"category_scores_gemma":[0.000016432603,0.00006619917,0.00004872167,0.000106503576,0.000090787675,0.00040093102,0.000017528166,0.00008923608,0.0000014013725],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008309507,0.0000075502858,0.008346115,0.00019946232,0.00003504622,1.6931843e-8,0.0005022243,0.08493544,0.8911319,0.0016412771,0.00009608467,0.013096605],"study_design_scores_gemma":[0.00011279825,0.000010919708,0.0022176872,0.00012778406,0.000021726888,0.000016943668,0.00141523,0.68322754,0.3096081,0.0031093007,0.00004337548,0.00008859501],"about_ca_topic_score_codex":0.000016163767,"about_ca_topic_score_gemma":2.4277193e-7,"teacher_disagreement_score":0.59829205,"about_ca_system_score_codex":0.000044726858,"about_ca_system_score_gemma":0.000007684845,"threshold_uncertainty_score":0.2699524},"labels":[],"label_agreement":null},{"id":"W2177894083","doi":"10.1139/cjce-2014-0484","title":"Assessing the performance of the building information modeling (BIM) implementation process within a small specialty contracting enterprise","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"Industry Canada","keywords":"Building information modeling; Integrated project delivery; Process (computing); Scope (computer science); Process management; Enabling; Quality (philosophy); Business; Project management; Engineering management; Operations management; Engineering; Systems engineering; Computer science","score_opus":0.015692255746020147,"score_gpt":0.2335851830228926,"score_spread":0.21789292727687246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2177894083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8953145,0.00013686687,0.10282001,0.000060905808,0.0012779642,0.000087159075,0.0000024313108,0.000014740718,0.00028543276],"genre_scores_gemma":[0.9992908,0.0000043912314,0.0004944453,0.00001623547,0.00017734563,0.000003067254,0.0000010252497,0.000011678255,9.870612e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999111,0.000014371351,0.00050412497,0.00003559583,0.00017105012,0.00016384391],"domain_scores_gemma":[0.9992716,0.000021269061,0.00020999231,0.0000839782,0.00028301222,0.00013020512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045716512,0.000098519486,0.00011351756,0.00017221046,0.000093221024,0.000148404,0.00017652512,0.000042175,0.000009580366],"category_scores_gemma":[0.000104489845,0.00007126504,0.00005077853,0.00021745915,0.00001605298,0.0012212585,0.0000050825747,0.00029736653,3.8672195e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017232987,5.939499e-7,0.0030808034,0.000045045927,0.000019787934,4.813612e-7,0.0024535286,0.99111336,0.00035941676,0.00018992956,0.00002521901,0.002710115],"study_design_scores_gemma":[0.0002642489,0.000014698117,0.0010413739,0.00026335524,0.000025761256,0.000107692525,0.0039445623,0.9897271,0.0040708417,0.000065416134,0.00038054085,0.00009441274],"about_ca_topic_score_codex":0.0002490897,"about_ca_topic_score_gemma":0.011830447,"teacher_disagreement_score":0.10397633,"about_ca_system_score_codex":0.00021876654,"about_ca_system_score_gemma":0.0004484863,"threshold_uncertainty_score":0.66016674},"labels":[],"label_agreement":null},{"id":"W2178405569","doi":"10.1016/j.autcon.2015.09.006","title":"A hybrid simulation approach for quantitatively analyzing the impact of facility size on construction projects","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Sizing; Process (computing); Flexibility (engineering); Industrial engineering; Discrete event simulation; Simulation modeling; Computer science; Operations research; Project management; Interdependence; Task (project management); Facility management; Engineering; Systems engineering; Simulation","score_opus":0.04389776266904169,"score_gpt":0.29872320346662223,"score_spread":0.2548254407975805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178405569","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6426072,0.000033489207,0.35541913,0.000016115222,0.00035928882,0.0005693593,0.000057976195,0.00017467767,0.00076274824],"genre_scores_gemma":[0.98141813,0.00000513999,0.018308263,0.0000031013876,0.00005682405,0.000121157085,0.00007065042,0.000012337185,0.000004383564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878424,0.000115149414,0.00052471855,0.00021214703,0.00019850668,0.00016523922],"domain_scores_gemma":[0.99892986,0.00030366733,0.00020922667,0.00019023675,0.0003224755,0.000044539636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004477142,0.00018304514,0.00022307794,0.00024444156,0.00008450126,0.000047520647,0.000078322344,0.000101745994,0.000016241202],"category_scores_gemma":[0.0003497884,0.00014597662,0.00012544321,0.00040596782,0.00016340929,0.00043625702,0.0000066961866,0.00015984091,0.0000046588575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011522452,0.000030265253,0.007876655,0.000054403376,0.000046438432,8.930935e-8,0.00061955134,0.9146694,0.001445175,0.004825856,0.00012376356,0.07019317],"study_design_scores_gemma":[0.000913173,0.00014282872,0.00936883,0.000032761982,0.000021409758,0.000027305354,0.001329868,0.9795469,0.004426912,0.0039979354,0.00002655732,0.00016553885],"about_ca_topic_score_codex":0.00005981922,"about_ca_topic_score_gemma":0.0000044237004,"teacher_disagreement_score":0.33881095,"about_ca_system_score_codex":0.00033469405,"about_ca_system_score_gemma":0.00010577442,"threshold_uncertainty_score":0.59527534},"labels":[],"label_agreement":null},{"id":"W2178688148","doi":"10.1007/1-4020-4891-2_48","title":"Interactive Knowledge-Based Assistance For Conceptual Design of Building Structures","year":2007,"lang":"en","type":"book-chapter","venue":"Solid mechanics and its applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Conceptual design; Knowledge base; Computer science; Engineering; Systems engineering; Software engineering; Architectural design; Architectural technology; Construction engineering; Human–computer interaction; Architecture; Artificial intelligence","score_opus":0.03279335887861892,"score_gpt":0.27961576885262823,"score_spread":0.2468224099740093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178688148","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000060953844,0.0024510329,0.98174036,0.0000071137088,0.00021328244,0.00078648137,0.00023082794,0.00007636093,0.014488467],"genre_scores_gemma":[0.8254281,0.0020232599,0.14183533,0.00014929111,0.00134493,0.002102736,0.00051367196,0.00046612482,0.026136523],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993026,0.0000040112695,0.0002938949,0.00020503567,0.00007578413,0.00011864299],"domain_scores_gemma":[0.99923956,0.00015095716,0.00013642537,0.00014881945,0.00027177497,0.000052460367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008023673,0.00020103161,0.00023682353,0.00013017892,0.00008093058,0.000017482314,0.00009554342,0.00024747822,0.000050998427],"category_scores_gemma":[0.0000091931115,0.0002096226,0.000071552735,0.000038184044,0.000028150602,0.00004336632,0.000011004488,0.00018435746,0.0000025014253],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012815855,0.0000044395206,1.4846844e-8,0.00007881926,0.000054520387,4.595514e-8,0.000056660825,0.0011790219,0.004011308,0.97444063,0.0002024664,0.019959241],"study_design_scores_gemma":[0.0005223503,0.00011165858,4.7627213e-7,0.00023756028,0.00020027782,0.0000059258336,0.00014538396,0.3282811,0.04677927,0.36105278,0.2620915,0.0005717406],"about_ca_topic_score_codex":3.3800202e-7,"about_ca_topic_score_gemma":0.0000045585557,"teacher_disagreement_score":0.839905,"about_ca_system_score_codex":0.00006181042,"about_ca_system_score_gemma":0.000056588116,"threshold_uncertainty_score":0.85481614},"labels":[],"label_agreement":null},{"id":"W2180715974","doi":"10.1155/2015/579486","title":"An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Schedule; Building information modeling; Earned value management; Project management; Process (computing); Project planning; Construction management; Pre-construction services; Systems engineering; Cost estimate; Project management triangle; Track (disk drive); Computer science; Engineering management; Engineering; Operations management; Scheduling (production processes); Project charter; Civil engineering","score_opus":0.012136623610980522,"score_gpt":0.22200720299923216,"score_spread":0.20987057938825163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180715974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93174005,0.000107987405,0.06614727,0.000018486304,0.0014059221,0.00035933685,0.000009243438,0.00012516642,0.00008655985],"genre_scores_gemma":[0.9899336,0.0000054107613,0.009826134,0.000003119464,0.00019262123,0.000011560296,0.0000010171705,0.000023183471,0.0000033491315],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987966,0.00006341565,0.00065214245,0.00010879368,0.00024335306,0.00013572583],"domain_scores_gemma":[0.9989426,0.000041282296,0.00018512222,0.00016064628,0.00048730822,0.00018305294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048516676,0.00017666823,0.00030241834,0.00040028576,0.00005164209,0.0000741131,0.00009866909,0.000081706334,0.0000076297],"category_scores_gemma":[0.000059018366,0.00013416455,0.00005171111,0.0004755606,0.000066494424,0.00044327424,0.000009307252,0.00029176852,0.0000022930462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022667497,0.00012163658,0.006077777,0.00027222236,0.0006489487,0.00048687236,0.008883253,0.7639942,0.021156026,0.003153908,0.00025091713,0.19472754],"study_design_scores_gemma":[0.002947076,0.0013188764,0.00085947954,0.0004371593,0.00034909346,0.21660896,0.19783309,0.5708825,0.00627191,0.000030066602,0.0018909374,0.0005708518],"about_ca_topic_score_codex":0.000050018934,"about_ca_topic_score_gemma":0.00001161372,"teacher_disagreement_score":0.21612209,"about_ca_system_score_codex":0.00015820866,"about_ca_system_score_gemma":0.000080956685,"threshold_uncertainty_score":0.54710716},"labels":[],"label_agreement":null},{"id":"W2181076214","doi":"10.22260/isarc2009/0048","title":"Integrating Automated Data Acquisition Technologies for Progress Reporting of Construction Projects","year":2009,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Data acquisition; Automation; Software; Data collection; Data management; Coding (social sciences); Schedule; Photogrammetry; Bar chart; Software engineering; Systems engineering; Database; Engineering; Operating system; Artificial intelligence","score_opus":0.025918574307384444,"score_gpt":0.2721018466850441,"score_spread":0.24618327237765966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181076214","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9910323,0.00026766336,0.001482259,0.00061632105,0.00043121216,0.0008779686,0.000032965476,0.0020736132,0.0031857023],"genre_scores_gemma":[0.9598609,0.000008948795,0.04003503,0.000004410102,0.000036465273,0.000027106476,0.000010139195,0.000010200511,0.0000067921505],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99884003,0.0000019783577,0.0007160536,0.00016675727,0.00014180207,0.00013335787],"domain_scores_gemma":[0.9986278,0.000014770098,0.00082860055,0.00016787561,0.0003512097,0.000009753369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033330213,0.00011179861,0.00019766905,0.00010459271,0.0000724103,0.000032079257,0.00032682793,0.00010664451,0.000001437313],"category_scores_gemma":[0.0004997337,0.0000817769,0.000052988904,0.000337633,0.00013726295,0.0003760712,0.000051799296,0.000117152966,1.7462621e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005888369,0.00004711026,0.013857697,0.000892353,0.000085796055,1.3950175e-7,0.00075032504,0.00007129485,0.47241122,0.04808914,0.00324201,0.46049404],"study_design_scores_gemma":[0.00033729157,0.00012193336,0.0027165709,0.0006870454,0.00006762509,0.00009615293,0.0061414903,0.14591856,0.83158624,0.011898039,0.00023297878,0.00019609577],"about_ca_topic_score_codex":0.0000025979189,"about_ca_topic_score_gemma":7.0509304e-7,"teacher_disagreement_score":0.46029794,"about_ca_system_score_codex":0.000031715408,"about_ca_system_score_gemma":0.000020445032,"threshold_uncertainty_score":0.33347654},"labels":[],"label_agreement":null},{"id":"W2182544120","doi":"","title":"INTEGRATING BAR CODING AND RFID TO AUTOMATE DATA COLLECTION FROM CONSTRUCTION SITES","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Coding (social sciences); Data collection; Computer science; Data acquisition; Real-time computing; Operating system","score_opus":0.013053787473384012,"score_gpt":0.22664539932216443,"score_spread":0.21359161184878042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182544120","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9742674,0.00041304826,0.022160161,0.00034664964,0.0010898004,0.00018974437,0.00006161887,0.00012969262,0.0013418769],"genre_scores_gemma":[0.98802704,0.00017572564,0.011496072,0.000046463712,0.00017557734,0.0000064948845,0.000012223798,0.000025211844,0.000035182224],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982673,0.000009600747,0.00058341527,0.0005034893,0.0003830524,0.00025313598],"domain_scores_gemma":[0.9991296,0.00022446156,0.00019379117,0.00013812771,0.00022096123,0.000093091796],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033473855,0.00031029555,0.00035701864,0.0003421384,0.00021047986,0.00033067656,0.00023443354,0.00010572159,0.000009087315],"category_scores_gemma":[0.00025905686,0.00027094648,0.000030375166,0.00025568323,0.000072339884,0.00027187692,0.00024417022,0.00032629722,1.7483256e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005505293,0.00015171226,0.10286858,0.0009808511,0.00046802493,0.000022915912,0.0019069705,0.06170785,0.118095115,0.15690224,0.03116394,0.52518123],"study_design_scores_gemma":[0.00061966025,0.000037000624,0.04936585,0.0019602424,0.000031587548,0.00009267855,0.0004749797,0.93938076,0.0020679387,0.0049321684,0.0006590292,0.00037810917],"about_ca_topic_score_codex":0.025259295,"about_ca_topic_score_gemma":0.05966897,"teacher_disagreement_score":0.8776729,"about_ca_system_score_codex":0.00016946219,"about_ca_system_score_gemma":0.000052312553,"threshold_uncertainty_score":0.99997425},"labels":[],"label_agreement":null},{"id":"W2182695012","doi":"10.12821/ijispm030103","title":"Defining Building Information Modeling implementation activities based on capability maturity evaluation: a theoretical model","year":2022,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Centre interuniversitaire de recherche sur les reseaux d'entreprise, la logistique et le transport; Polytechnique Montréal","keywords":"Building information modeling; Maturity (psychological); Capability Maturity Model; Process management; Computer science; Service Integration Maturity Model; Architecture; Knowledge management; Information model; Systems engineering; Engineering; Engineering management; Risk analysis (engineering); Software engineering; Business; Operations management; Software","score_opus":0.012334280257843711,"score_gpt":0.2794577903471058,"score_spread":0.26712351008926205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182695012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14427356,0.00013805088,0.8336018,0.00028052068,0.002876196,0.0009975019,0.00015031663,0.000100550526,0.017581515],"genre_scores_gemma":[0.9971111,0.000029787821,0.002448552,0.00013844919,0.000046451096,0.00013699697,0.000081223014,0.0000051594443,0.0000022689726],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979458,0.00008541086,0.00074480893,0.000055161996,0.0010671085,0.00010174693],"domain_scores_gemma":[0.9992051,0.000032489028,0.00029196616,0.00008237404,0.00035900986,0.00002905785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014185542,0.00011529479,0.00012225792,0.0006803191,0.00015150111,0.0003013477,0.00015211225,0.000031006562,0.00006008589],"category_scores_gemma":[0.000015311442,0.00010884029,0.000059495153,0.0001307448,0.000019004008,0.0019731768,0.00004339326,0.00020117874,0.0000016970076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007430996,0.000007978894,0.00004514094,0.000056438734,0.00006113618,3.5265876e-7,0.0009105875,0.79817647,0.000003334706,0.15897542,0.00036262782,0.04132623],"study_design_scores_gemma":[0.00082652684,0.0000589439,0.0000419975,0.00004588931,0.000029741466,0.000041670493,0.007871206,0.98583347,0.000028937002,0.0011933872,0.003925132,0.00010307719],"about_ca_topic_score_codex":0.000016598913,"about_ca_topic_score_gemma":8.8757946e-7,"teacher_disagreement_score":0.85283756,"about_ca_system_score_codex":0.00038311392,"about_ca_system_score_gemma":0.000081229125,"threshold_uncertainty_score":0.44383782},"labels":[],"label_agreement":null},{"id":"W2182852836","doi":"","title":"Acquisition And Modeling Of Conceptual Structural Design Knowledge","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Conceptual design; Computer science; Knowledge acquisition; Process (computing); Knowledge representation and reasoning; Design knowledge; Component (thermodynamics); Procedural knowledge; Human–computer interaction; Software engineering; Conceptual model; Knowledge management; Knowledge engineering; Artificial intelligence; Programming language","score_opus":0.01656420565880361,"score_gpt":0.23053253962528486,"score_spread":0.21396833396648124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182852836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95803076,0.0011805431,0.03864981,0.000084027124,0.00063779496,0.0001456393,0.000016940612,0.000055446282,0.0011990451],"genre_scores_gemma":[0.9960753,0.00014722753,0.003589289,0.000017086373,0.000118465556,0.0000044280346,0.0000023797713,0.000019853947,0.000025995236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860585,0.000009059705,0.0005412376,0.0003123691,0.00031442475,0.00021703824],"domain_scores_gemma":[0.9992636,0.0001590625,0.00016774947,0.000073131145,0.00027233022,0.00006412466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002791697,0.00026347957,0.00033723837,0.0002617039,0.000112494316,0.00010974017,0.00014562893,0.00011017716,0.000005580068],"category_scores_gemma":[0.00008458443,0.00022246152,0.00003973803,0.0001555715,0.00011164235,0.00016923842,0.000104826155,0.00025253402,5.397559e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036658513,0.00008094465,0.0087328255,0.0007645586,0.00019893567,0.0000072136827,0.0019520872,0.6514869,0.030618973,0.17683314,0.0030676853,0.12589018],"study_design_scores_gemma":[0.00059859233,0.00004047895,0.008931699,0.0012287725,0.000019890864,0.000053716438,0.00035015953,0.97984874,0.0015579826,0.0070634526,0.000065690896,0.00024079518],"about_ca_topic_score_codex":0.0063740066,"about_ca_topic_score_gemma":0.009248771,"teacher_disagreement_score":0.3283619,"about_ca_system_score_codex":0.000106156476,"about_ca_system_score_gemma":0.000049740353,"threshold_uncertainty_score":0.9635634},"labels":[],"label_agreement":null},{"id":"W2183555822","doi":"10.1109/wsc.2008.4736355","title":"An integrated CAD and simulation model for concrete operations","year":2008,"lang":"en","type":"article","venue":"2008 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Visual Basic for Applications; Downtown; Slab; CAD; Computer science; Software; Engineering drawing; 3d model; Civil engineering; Engineering; Architectural engineering; Structural engineering; Programming language; Geography; Artificial intelligence","score_opus":0.03987809268743568,"score_gpt":0.2723750604807495,"score_spread":0.2324969677933138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183555822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24160638,0.000031690168,0.75738996,0.000026711868,0.00015527694,0.0002389993,0.000047378075,0.00022831168,0.00027530713],"genre_scores_gemma":[0.99139446,0.00001672895,0.007922981,0.000071849965,0.000072533665,0.000043670134,0.00015268795,0.00002305381,0.00030205306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925226,0.000022062199,0.00027813512,0.00020744897,0.00009749392,0.0001426022],"domain_scores_gemma":[0.9992907,0.00006432838,0.000026142743,0.00016300815,0.00037486394,0.000080926366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052385345,0.00016100564,0.00014291266,0.000103641636,0.00018133468,0.00007377298,0.00007231245,0.00011712153,0.00008379638],"category_scores_gemma":[0.000033138527,0.00016143043,0.000035204812,0.00009429242,0.00007218542,0.0006360492,0.00000622286,0.000107714026,0.000009114373],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018367686,0.0000030300296,0.00021348504,0.0000075240487,0.000011566155,2.4859727e-7,0.0009212179,0.9900372,0.0014830583,0.0015082175,0.00007327778,0.005722808],"study_design_scores_gemma":[0.00042107177,0.00004196761,0.00048307484,0.000013755442,0.000011919827,0.000005571271,0.000076467346,0.99730617,0.0002828079,0.00027567046,0.00089245406,0.00018908488],"about_ca_topic_score_codex":0.000014040884,"about_ca_topic_score_gemma":0.00006173955,"teacher_disagreement_score":0.74978805,"about_ca_system_score_codex":0.00003930652,"about_ca_system_score_gemma":0.000051270967,"threshold_uncertainty_score":0.6582942},"labels":[],"label_agreement":null},{"id":"W2183649514","doi":"10.5539/ijms.v7n6p162","title":"Critical Barriers to BIM Implementation in the AEC Industry","year":2015,"lang":"en","type":"article","venue":"International Journal of Marketing Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Business; Construction industry; Process management; Engineering management; Knowledge management; Construction engineering; Computer science; Operations management; Engineering","score_opus":0.029005603909908178,"score_gpt":0.3598112690651132,"score_spread":0.330805665155205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183649514","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9839817,0.0007670416,0.000848472,0.0084419055,0.003484888,0.000056264587,0.000004967284,0.000016987055,0.0023977729],"genre_scores_gemma":[0.9985145,0.000048218357,0.00066845317,0.00034669443,0.00040335732,0.0000057943753,4.7659594e-7,0.0000047671847,0.000007744552],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9990876,0.00012524567,0.0003080931,0.000043327025,0.0003546041,0.0000811319],"domain_scores_gemma":[0.99899286,0.00034119317,0.000046509034,0.000034591965,0.00052538497,0.000059439586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017412616,0.000060575476,0.00008316067,0.00015999083,0.000026955455,0.000051685,0.0001726209,0.00003504589,0.000042473643],"category_scores_gemma":[0.0028677366,0.0000436176,0.0000319027,0.00010295232,0.000029900313,0.00016965833,0.000019703397,0.0002445042,0.000003148588],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010592818,0.0000783809,0.30954278,0.00007512077,0.0014696077,0.00029785707,0.04162357,0.016286345,0.0011645553,0.020166427,0.26997545,0.33826062],"study_design_scores_gemma":[0.003759139,0.00039546398,0.2578614,0.0009941799,0.00013042487,0.0014686527,0.61456525,0.0020791779,0.0023816626,0.015228742,0.10042721,0.00070865714],"about_ca_topic_score_codex":0.0000059535423,"about_ca_topic_score_gemma":0.000037102403,"teacher_disagreement_score":0.5729417,"about_ca_system_score_codex":0.00014478732,"about_ca_system_score_gemma":0.000044627595,"threshold_uncertainty_score":0.34331557},"labels":[],"label_agreement":null},{"id":"W2186564068","doi":"","title":"Virtual steel model concept for information and fabrication integration","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Engineering; Brace; Bracing; Connection (principal bundle); Construction engineering; Mechanical engineering; Computer science","score_opus":0.009074912286222139,"score_gpt":0.21383504171344803,"score_spread":0.20476012942722588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2186564068","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77139527,0.0003735044,0.22509935,0.00030378014,0.0008367841,0.00032008538,0.000053284515,0.0000945046,0.001523421],"genre_scores_gemma":[0.99534917,0.00013148833,0.0042515593,0.00005704943,0.00011115645,0.000016522821,0.000011663204,0.000016331425,0.000055060606],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986533,0.0000046858095,0.0005572572,0.00026009727,0.00032590568,0.00019877081],"domain_scores_gemma":[0.99914217,0.0001425046,0.00021360088,0.00007322363,0.00036931032,0.000059192822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026329426,0.00024858047,0.000264531,0.0002901606,0.00013647099,0.00023239171,0.00013233851,0.000114977614,0.0000020546834],"category_scores_gemma":[0.00018257377,0.00021204358,0.000038194965,0.00014659055,0.00006224435,0.00039018196,0.0000729045,0.00022556241,7.258132e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020657039,0.00005122861,0.002201405,0.0003077828,0.00007851431,7.4597847e-7,0.0010225717,0.24934153,0.009967227,0.29174227,0.008613818,0.43646634],"study_design_scores_gemma":[0.00067180244,0.000043406224,0.01041151,0.0007233648,0.000017506229,0.000020923173,0.00030730967,0.9790281,0.0013880763,0.0066120466,0.0005386844,0.00023728398],"about_ca_topic_score_codex":0.0043285224,"about_ca_topic_score_gemma":0.01162887,"teacher_disagreement_score":0.72968656,"about_ca_system_score_codex":0.00014417806,"about_ca_system_score_gemma":0.00005264331,"threshold_uncertainty_score":0.86468863},"labels":[],"label_agreement":null},{"id":"W2187318879","doi":"10.14288/1.0076339","title":"BIM maturity assessment and certification in construction project team selection","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Maturity (psychological); Capability Maturity Model; Certification; Process management; Audit; Project team; Work (physics); Engineering management; Knowledge management; Engineering; Business; Computer science; Operations management","score_opus":0.012847876909424422,"score_gpt":0.19576829291534315,"score_spread":0.1829204160059187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187318879","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921781,0.000056615718,0.0044396734,0.000021431439,0.00020076323,0.00016529695,0.000016355743,0.000113697126,0.002808079],"genre_scores_gemma":[0.99703914,0.00007927082,0.0027988355,0.0000023617426,0.000016583665,0.0000011621296,0.000013855373,0.0000056534136,0.0000431612],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9995517,0.000029310448,0.00008858169,0.00014263575,0.0001027595,0.000084982246],"domain_scores_gemma":[0.99975175,0.000006531622,0.0000373439,0.000065327564,0.00009929536,0.000039727995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000108764165,0.000027419333,0.00009897607,0.00007206246,0.00005330559,0.000054110704,0.000043151325,0.00008661483,0.000011134207],"category_scores_gemma":[0.0000056299455,0.000092774506,0.000019138335,0.00025858774,0.00008520334,0.00032902224,0.000011373438,0.00011497577,0.0000020831937],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069797125,0.000034664732,0.10953267,0.00006207216,0.00001673862,0.000002821105,0.00020704676,0.00016400796,0.00085522997,0.00007192626,0.0018554754,0.88719034],"study_design_scores_gemma":[0.0004989853,0.000029529792,0.979022,0.00004171506,0.000010933589,0.00010087601,0.0024196492,0.016680608,0.000008411386,0.000728522,0.0003599857,0.00009872995],"about_ca_topic_score_codex":0.023597516,"about_ca_topic_score_gemma":0.11398214,"teacher_disagreement_score":0.88709164,"about_ca_system_score_codex":0.00017228488,"about_ca_system_score_gemma":0.00006301705,"threshold_uncertainty_score":0.98290443},"labels":[],"label_agreement":null},{"id":"W2187366549","doi":"10.7492/ijaec.2013.021","title":"A Simulation Based Decision Tool for Transportation of Ready Mixed Concrete","year":2013,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Operations research; Engineering","score_opus":0.00410180547691293,"score_gpt":0.20387069412581701,"score_spread":0.19976888864890407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187366549","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47289723,0.000055971217,0.5259673,0.000034756446,0.0009207001,0.000074654236,0.000019045663,0.000022628106,0.000007739198],"genre_scores_gemma":[0.9258229,0.00001359998,0.07394338,0.000008032041,0.00017083019,0.00000754944,0.00001947311,0.000012472424,0.0000017528193],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999223,0.000007677911,0.00043106312,0.000069366426,0.00019617236,0.00007270789],"domain_scores_gemma":[0.99902576,0.00028773208,0.00013866452,0.000047658414,0.0004637616,0.000036416666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000088465335,0.000103889244,0.00014573049,0.00027605597,0.00001737696,0.000032062348,0.0000716726,0.00007279305,0.000021963891],"category_scores_gemma":[0.00010226522,0.0000952431,0.00007939746,0.00006861939,0.000030501107,0.0001950448,0.0000017863129,0.00012086209,4.639592e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006212856,0.0000020946422,0.00030269244,0.00003113685,0.00007002131,4.6658246e-7,0.00007470622,0.78485703,0.01901255,0.001178893,0.000020251699,0.19438805],"study_design_scores_gemma":[0.0014119676,0.00013503977,0.0059699574,0.00022624448,0.000052847736,0.00007122174,0.00007938644,0.9691244,0.018075025,0.0022431882,0.0024283936,0.00018232918],"about_ca_topic_score_codex":0.000003909168,"about_ca_topic_score_gemma":0.0000013181628,"teacher_disagreement_score":0.45292568,"about_ca_system_score_codex":0.000031410764,"about_ca_system_score_gemma":0.00001912141,"threshold_uncertainty_score":0.3883901},"labels":[],"label_agreement":null},{"id":"W2187426288","doi":"","title":"Development of CAD-Spreadsheet integrated solution to Optimazing Site Grading Design for industrial Construction","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Engineering; Oil refinery; Solver; Civil engineering; Computer science; Waste management","score_opus":0.08398845623587482,"score_gpt":0.23091521601980478,"score_spread":0.14692675978392994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187426288","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1648143,0.000007751395,0.83222276,0.0000051768397,0.00074323337,0.0003278515,0.0000067019496,0.00018575594,0.0016864933],"genre_scores_gemma":[0.5087453,0.0000011426313,0.49109924,0.00000461601,0.0000404502,0.00005609993,0.000014319563,0.000011865481,0.000026940334],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999252,0.00001560627,0.00035548836,0.00013043697,0.000082890154,0.00016353771],"domain_scores_gemma":[0.9996758,0.000023170704,0.00004649234,0.00008038488,0.00011426835,0.00005988175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018950168,0.00012450847,0.00014093344,0.00018927018,0.00007418531,0.000015736518,0.00005777774,0.00012664346,0.00009994799],"category_scores_gemma":[0.000029459627,0.000119147815,0.000037161135,0.00022187282,0.000024697656,0.00016652262,0.000008985115,0.00008838851,0.0000120992045],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029265607,0.00003781103,0.0010981148,0.000060559003,0.00017917325,4.339539e-7,0.00618334,0.0069562783,0.33141634,0.02069974,0.0031616099,0.6299139],"study_design_scores_gemma":[0.0007347656,0.000091388254,0.00025422542,0.00010305742,0.000035304452,0.000015770049,0.001250837,0.06765219,0.92507786,0.00037767948,0.0040809056,0.00032601782],"about_ca_topic_score_codex":0.00003652617,"about_ca_topic_score_gemma":0.000043423483,"teacher_disagreement_score":0.62958795,"about_ca_system_score_codex":0.0001203594,"about_ca_system_score_gemma":0.00006117485,"threshold_uncertainty_score":0.4858707},"labels":[],"label_agreement":null},{"id":"W2203773648","doi":"","title":"Adaptable effectiveness of industrialised building (IBS) in construction projects","year":2013,"lang":"en","type":"other","venue":"UMP Institutional Repository (Universiti Malaysia Pahang)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Construction waste; Construction management; Government (linguistics); Quality (philosophy); Productivity; Construction industry; Business; Engineering; Building construction; Construction engineering; Pre-construction services; Urban construction; Transport engineering; Civil engineering; Project management; Architectural engineering; Program management; Economic growth; Economics","score_opus":0.009042453486398011,"score_gpt":0.18433042970681118,"score_spread":0.17528797622041317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2203773648","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19347805,0.0006631694,0.0077408897,0.0000072409066,0.004406463,0.0010745996,0.00011408124,0.00050685124,0.79200864],"genre_scores_gemma":[0.9625058,0.00008554673,0.0025887054,0.000004943402,0.0005533099,0.000077619385,0.00018640189,0.00017948438,0.033818167],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988329,0.000116751944,0.00026740305,0.0003009781,0.0002671471,0.00021486454],"domain_scores_gemma":[0.9994155,0.000048250724,0.00016765897,0.00021717582,0.0000842961,0.000067126384],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011676157,0.00028532423,0.00039572138,0.00090254354,0.000083394036,0.000033827095,0.00017000773,0.0005716194,0.0003982759],"category_scores_gemma":[0.00001356419,0.00033272666,0.00010653906,0.00048537378,0.0002598446,0.0003472538,0.000033799646,0.0003527795,0.000026472111],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047404965,0.0002883213,0.008925561,0.0048760874,0.0015404453,0.00048894517,0.00043168486,0.20064917,0.12601587,0.5875619,0.056527212,0.012220719],"study_design_scores_gemma":[0.020505127,0.00068405666,0.009372383,0.03261436,0.0013399337,0.0031915505,0.0065343888,0.2586459,0.13686223,0.0023550687,0.52043355,0.0074614994],"about_ca_topic_score_codex":0.000700841,"about_ca_topic_score_gemma":0.000013164543,"teacher_disagreement_score":0.76902777,"about_ca_system_score_codex":0.0004870698,"about_ca_system_score_gemma":0.00026238637,"threshold_uncertainty_score":0.9999125},"labels":[],"label_agreement":null},{"id":"W222089776","doi":"","title":"Windsor Regional Construction Traffic Management System","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Windsor; Transport engineering; Government (linguistics); Gateway (web page); Relocation; Business; Service (business); Engineering; Environmental planning; Computer science; Geography","score_opus":0.010229224694275531,"score_gpt":0.1723563698603275,"score_spread":0.16212714516605198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W222089776","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6300148,0.00015964532,0.076896325,0.00008542188,0.002014722,0.00022577363,0.0000025638221,0.0022496362,0.28835112],"genre_scores_gemma":[0.992695,0.00004545801,0.006232394,0.000015847252,0.000090383764,0.00001710299,0.0000051630304,0.00000879142,0.0008898748],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996158,0.000005388696,0.00011960792,0.00008018719,0.00009595392,0.00008306934],"domain_scores_gemma":[0.99985665,0.0000035456703,0.00001031079,0.00008164403,0.00001863223,0.000029242748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000018141778,0.00006835036,0.00005869393,0.00006829113,0.00007646623,0.000008562436,0.000035126974,0.000040969047,0.000107394204],"category_scores_gemma":[2.5406237e-7,0.00006342673,0.000032596075,0.00009782402,0.00003850042,0.000079318386,0.0000028244601,0.000049427083,0.00012549345],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021255724,0.000023146187,0.00095293985,0.00027780005,0.00021144061,0.00003983845,0.00033335638,0.040457487,0.00050554,0.6156967,0.04371032,0.29777017],"study_design_scores_gemma":[0.003710111,0.00011696832,0.027071055,0.00031879888,0.00015628665,0.013756251,0.016655942,0.5332483,0.00627995,0.00057514827,0.3962485,0.0018627017],"about_ca_topic_score_codex":0.0000016980181,"about_ca_topic_score_gemma":0.0000018362202,"teacher_disagreement_score":0.61512154,"about_ca_system_score_codex":0.000057930974,"about_ca_system_score_gemma":0.0000042216384,"threshold_uncertainty_score":0.2586467},"labels":[],"label_agreement":null},{"id":"W2233210616","doi":"","title":"An Integrated Condition Assessment Model for Educational Buildings Using BIM","year":2012,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Building information modeling; Process (computing); Facility management; Asset (computer security); Engineering; Service (business); Asset management; Architectural engineering; Quality (philosophy); Computer science; Civil engineering; Risk analysis (engineering); Operations research; Business; Operations management","score_opus":0.030671734693819088,"score_gpt":0.3184123173711249,"score_spread":0.28774058267730585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2233210616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91546965,0.00013473911,0.054207228,0.000047213704,0.0028736829,0.0008555714,0.00012903837,0.00027622457,0.026006676],"genre_scores_gemma":[0.985451,0.000038844166,0.001716295,0.0000022300687,0.00065901113,0.000028314294,0.0017875358,0.00008085664,0.0102359485],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99806756,0.00014782965,0.00029196803,0.00044914507,0.00047825076,0.0005652603],"domain_scores_gemma":[0.99855,0.000103370825,0.00012115754,0.0003538554,0.0005937106,0.00027791908],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031113214,0.00030961775,0.00028786823,0.0013029608,0.0006656885,0.00018986725,0.0003777343,0.00046820767,0.0001149416],"category_scores_gemma":[0.000016712898,0.0003725649,0.00016774323,0.00064934295,0.000116208634,0.00084865786,0.000016402715,0.00090394606,0.000007548125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001021399,0.0006999246,0.017173199,0.0017327685,0.0012992963,0.000039631184,0.0019246972,0.06510979,0.4939817,0.3962156,0.006658454,0.014143558],"study_design_scores_gemma":[0.0010357631,0.00026560453,0.020464003,0.00032473108,0.00030771916,0.00004242517,0.005013846,0.9174303,0.033854414,0.005913336,0.014181593,0.0011663131],"about_ca_topic_score_codex":0.0016142499,"about_ca_topic_score_gemma":0.003227247,"teacher_disagreement_score":0.85232043,"about_ca_system_score_codex":0.0019434339,"about_ca_system_score_gemma":0.0014229375,"threshold_uncertainty_score":0.9998726},"labels":[],"label_agreement":null},{"id":"W2234801407","doi":"","title":"BIM, tendances actuelles et grands enjeux au Québec et de par le monde","year":2011,"lang":"fr","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science","score_opus":0.023970456719550687,"score_gpt":0.2400100662235302,"score_spread":0.2160396095039795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2234801407","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23736982,0.011269378,0.25023496,0.018389754,0.0042936276,0.00023064206,0.00004095418,0.0007028121,0.47746804],"genre_scores_gemma":[0.9784476,0.00096263876,0.014510677,0.00028318394,0.00015534848,0.000021045445,0.0000058311625,0.00002676913,0.005586894],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991894,0.000064401036,0.00021915058,0.0001634611,0.00008956184,0.00027405279],"domain_scores_gemma":[0.999594,0.000054722896,0.000037476875,0.0001622267,0.000051524796,0.0001000821],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017587957,0.00018273169,0.00015200325,0.0000706033,0.000104125415,0.000043685355,0.00011173705,0.000165725,0.0014253333],"category_scores_gemma":[0.000028167777,0.00016700264,0.00009577511,0.000111381494,0.00011871874,0.000359574,0.000017753067,0.0002248157,0.00016069513],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022953222,0.00008259531,0.023700591,0.0001172027,0.00012769728,0.000007075029,0.009456221,0.0005107449,0.00375475,0.8804548,0.0057000383,0.07606536],"study_design_scores_gemma":[0.0018752037,0.0002892285,0.18101944,0.00050026394,0.00018333588,0.00031698888,0.009101564,0.012819987,0.23003483,0.07628942,0.48612252,0.0014472211],"about_ca_topic_score_codex":0.2609977,"about_ca_topic_score_gemma":0.24041483,"teacher_disagreement_score":0.80416536,"about_ca_system_score_codex":0.00013812166,"about_ca_system_score_gemma":0.00074815186,"threshold_uncertainty_score":0.9994875},"labels":[],"label_agreement":null},{"id":"W2242924137","doi":"","title":"Cash flow optimization and visualization of residence housing for builders","year":2013,"lang":"en","type":"article","venue":"Deakin Research Online (Deakin University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Cash flow; Cash flow forecasting; Net present value; Visualization; Computer science; Discounted cash flow; Cash; Operations research; Payment; Procurement; Finance; Business; Engineering; Production (economics); Economics; Marketing","score_opus":0.036739221024255524,"score_gpt":0.2950364268264285,"score_spread":0.25829720580217297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2242924137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36750472,0.00003877949,0.6310176,0.00013244603,0.000089065776,0.00051341095,0.00003365847,0.00012111515,0.0005491763],"genre_scores_gemma":[0.9433945,0.00011999147,0.056116812,0.000008270334,0.00006833699,0.0000048293186,0.00007652115,0.000025603591,0.00018514166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916106,0.00007502585,0.00015141879,0.00017603376,0.000220994,0.00021543473],"domain_scores_gemma":[0.9990469,0.00014167328,0.000037612437,0.00013215443,0.00057043036,0.00007123061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018051777,0.00009323447,0.000116832016,0.00061748485,0.00014625359,0.000047589932,0.00012628314,0.000109310975,0.000065742235],"category_scores_gemma":[0.000101915226,0.000105855484,0.000032150674,0.0007234759,0.0001382394,0.00042380622,0.0000420458,0.00013504257,0.0000024172791],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001357208,0.0001358646,0.004225171,0.00068323413,0.00013118598,0.0000130147155,0.0005057796,0.76773435,0.020513622,0.13360077,0.0042743366,0.06804692],"study_design_scores_gemma":[0.0005061856,0.00007987322,0.0010506822,0.00012464695,0.000013202194,0.000004356702,0.0005856121,0.98943144,0.0025741567,0.00040549983,0.0050742347,0.00015011558],"about_ca_topic_score_codex":0.0004418199,"about_ca_topic_score_gemma":0.00022311123,"teacher_disagreement_score":0.57588977,"about_ca_system_score_codex":0.00009830022,"about_ca_system_score_gemma":0.000051083734,"threshold_uncertainty_score":0.43166614},"labels":[],"label_agreement":null},{"id":"W2243253930","doi":"","title":"Creation of an Evolutive Conceptual Know-how Framework for Integrative Building Design","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Multidisciplinary approach; Building information modeling; Process management; Knowledge management; Productivity; Process (computing); Conceptual framework; Building design; Sustainable design; Computer science; Engineering; Engineering management; Architectural engineering; Sustainability; Operations management; Sociology","score_opus":0.03384762083512895,"score_gpt":0.254374445830927,"score_spread":0.22052682499579807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2243253930","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0198872,0.00007579109,0.9738498,0.000008328368,0.00027185096,0.00023119293,0.000008515384,0.00014833464,0.0055189948],"genre_scores_gemma":[0.6375042,0.0000058561154,0.36230153,0.0000053073054,0.00004200201,0.00004189948,0.0000036045283,0.000009570768,0.000086016364],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99957806,0.000026966343,0.00013128282,0.00010448535,0.00005866017,0.00010053692],"domain_scores_gemma":[0.99956805,0.00010478715,0.000038817263,0.00009315398,0.00015995244,0.000035228328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007438791,0.00009985202,0.00011797481,0.000065534296,0.000035416724,0.000011409262,0.00006653092,0.00011333369,0.00017756631],"category_scores_gemma":[0.00007395919,0.00008273015,0.000042307,0.000102023514,0.00008925771,0.00028144545,0.0000037888688,0.00008887046,0.0000023457148],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005142328,0.000018200913,0.000078704754,0.000009293303,0.000049419406,1.04482616e-7,0.0055158795,0.0004157656,0.0066169305,0.93465567,0.00029309947,0.052295525],"study_design_scores_gemma":[0.0003887422,0.00050672167,0.0006083623,0.000107845575,0.000047917987,0.00000424523,0.020329809,0.14145768,0.7044968,0.13105519,0.0007080606,0.00028863768],"about_ca_topic_score_codex":0.000020588965,"about_ca_topic_score_gemma":0.000014991632,"teacher_disagreement_score":0.8036005,"about_ca_system_score_codex":0.000041002364,"about_ca_system_score_gemma":0.000017314605,"threshold_uncertainty_score":0.33736375},"labels":[],"label_agreement":null},{"id":"W2245927609","doi":"10.18260/1-2--6135","title":"Interactive And Immersive Training In A Virtual Environment For Construction Students","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Division of Undergraduate Education","keywords":"Government (linguistics); Bridge (graph theory); Session (web analytics); Construction industry; Training (meteorology); Construction site safety; Work (physics); Tower; Engineering; Forensic engineering; Business; Civil engineering; Construction engineering; Medicine; Advertising; Geography; Mechanical engineering","score_opus":0.012794977955970252,"score_gpt":0.21926296224996975,"score_spread":0.20646798429399948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2245927609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6912736,0.000027628079,0.30664623,0.00022053736,0.00023352467,0.00025133954,0.0000077868,0.000045158256,0.0012941767],"genre_scores_gemma":[0.9983718,0.000016968825,0.0014604486,0.00006672032,0.000033559903,0.00002920306,0.0000033844083,0.0000054284174,0.0000125142815],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99972355,0.0000048390903,0.000088323686,0.00008219434,0.000042981814,0.00005809378],"domain_scores_gemma":[0.9999177,0.000019880496,0.000010081681,0.000018063944,0.0000043599243,0.000029911887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000017748407,0.00005204397,0.00006251576,0.000026781981,0.000014020005,0.000014558128,0.000021484468,0.000026315372,0.000055818466],"category_scores_gemma":[0.0000056996923,0.000052311752,0.0000111229465,0.000026731768,0.000020417969,0.00010154763,0.0000071945246,0.000055110162,0.000004264377],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014553535,0.0000156002,0.0041304342,0.00003413995,0.00011738924,0.000002142849,0.032620747,0.0066255126,0.042158578,0.016440788,0.00022629608,0.8974828],"study_design_scores_gemma":[0.009614596,0.0014780868,0.016537769,0.00012810332,0.00010545574,0.00010010589,0.43682268,0.36180028,0.13486026,0.0031952243,0.034006298,0.001351129],"about_ca_topic_score_codex":0.0000026863675,"about_ca_topic_score_gemma":0.0000054572542,"teacher_disagreement_score":0.8961317,"about_ca_system_score_codex":0.000029167904,"about_ca_system_score_gemma":0.0000035922728,"threshold_uncertainty_score":0.21332113},"labels":[],"label_agreement":null},{"id":"W2247240453","doi":"","title":"Housing construction analysis in Olivette Park, East St. Louis","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"St louis; Quarter (Canadian coin); Work (physics); East coast; Geography; Politics; Economy; History; Political science; Archaeology; Engineering; Economics","score_opus":0.0076686785309680915,"score_gpt":0.1905302428098452,"score_spread":0.18286156427887712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2247240453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78013545,0.00010499058,0.14914541,0.000029377336,0.0004936029,0.000066529945,0.0000041869416,0.00023585545,0.06978459],"genre_scores_gemma":[0.9954245,0.000017328608,0.004414044,0.000021613403,0.000023041437,0.00000534553,0.0000056041317,0.000007961228,0.00008056679],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950075,0.000024226096,0.00017261728,0.000105784566,0.00007520402,0.00012141071],"domain_scores_gemma":[0.99981755,0.000008626195,0.000016779728,0.00009895647,0.000026958329,0.00003114903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000066318426,0.00008305257,0.00011599782,0.00036765978,0.000028921775,0.0000397864,0.000026752572,0.000060594066,0.00084862753],"category_scores_gemma":[0.000008958903,0.00008220407,0.000055238936,0.0009766062,0.000027862889,0.00012040588,0.0000021860549,0.00009530186,0.00002473999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012050118,0.00004240042,0.49663338,0.00004463404,0.00077761535,0.000010453462,0.00060757785,0.16475335,0.004669745,0.18363574,0.0011669265,0.14764613],"study_design_scores_gemma":[0.0033969083,0.00008533567,0.13978717,0.00012329486,0.0013703079,0.00026068572,0.013213407,0.7159977,0.042602703,0.01214662,0.06823162,0.0027842347],"about_ca_topic_score_codex":0.00004394699,"about_ca_topic_score_gemma":0.00043117383,"teacher_disagreement_score":0.5512444,"about_ca_system_score_codex":0.00005856034,"about_ca_system_score_gemma":0.000009383446,"threshold_uncertainty_score":0.9291876},"labels":[],"label_agreement":null},{"id":"W2255928510","doi":"","title":"A Strategy For Collecting And Evaluating Information On Engineering Consultant Offices Using Neural Networks: A Case Study","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Standardization; Artificial neural network; Computer science; Process (computing); Field (mathematics); The Internet; Software engineering; Interface (matter); Information engineering; Information system; Artificial intelligence; Engineering management; Engineering; World Wide Web","score_opus":0.02475945567403902,"score_gpt":0.26877695228378196,"score_spread":0.24401749660974292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2255928510","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9842011,0.00029350788,0.014105115,0.000044603938,0.00065566954,0.00040174264,0.000017456736,0.000074863514,0.00020597268],"genre_scores_gemma":[0.9974314,0.00003108683,0.0023258633,0.000023904422,0.00013709863,0.000016536509,0.0000023137366,0.000023618739,0.000008170247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983414,0.000009617034,0.0006789762,0.00032092727,0.00036197234,0.00028710227],"domain_scores_gemma":[0.9988797,0.0003879522,0.00025835264,0.000077815625,0.00032446286,0.00007175702],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00052361225,0.00032256378,0.00035487124,0.000364546,0.00024461193,0.00036662357,0.00011809162,0.00009857698,0.000001607503],"category_scores_gemma":[0.00028967613,0.0002798153,0.000039806426,0.0002531676,0.000038853042,0.00028303172,0.000089153364,0.00032110763,2.00191e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011612901,0.00003656211,0.002940815,0.00021379715,0.000065130174,0.000011415131,0.00043847482,0.9396602,0.0010815137,0.0040318035,0.00019633444,0.05120781],"study_design_scores_gemma":[0.0010255352,0.00012879558,0.005215586,0.000997717,0.000034132332,0.0003488052,0.0012683083,0.9901846,0.000147075,0.0003314042,0.00003893914,0.0002791036],"about_ca_topic_score_codex":0.013665023,"about_ca_topic_score_gemma":0.021222191,"teacher_disagreement_score":0.05092871,"about_ca_system_score_codex":0.00016811048,"about_ca_system_score_gemma":0.00005403503,"threshold_uncertainty_score":0.9999654},"labels":[],"label_agreement":null},{"id":"W2260725742","doi":"10.14288/1.0074315","title":"Construction waste management at source : a Building Information Modeling based system dynamic approach","year":2013,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Information system; System dynamics; Computer science; Construction engineering; Risk analysis (engineering); Architectural engineering; Business; Systems engineering; Engineering; Artificial intelligence","score_opus":0.0031605070534608958,"score_gpt":0.12849298908018453,"score_spread":0.12533248202672362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2260725742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5721737,0.000019875824,0.42432684,0.000004136548,0.00012438823,0.00018474844,0.000012114101,0.00019451996,0.0029596686],"genre_scores_gemma":[0.98731124,0.000014308964,0.012514302,0.000005117424,0.00000975036,0.0000036140093,0.000038921862,0.000009655442,0.00009306941],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993854,0.000016674509,0.00015057606,0.00013390816,0.0001650635,0.00014836468],"domain_scores_gemma":[0.9996211,0.0000050696376,0.00006415847,0.00014327918,0.000110259374,0.00005611995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000062386964,0.000046212983,0.00013190771,0.000091634094,0.00019191351,0.000117286014,0.000113334194,0.00008862169,0.000038934762],"category_scores_gemma":[0.0000013825793,0.00015117748,0.00006706397,0.00018828461,0.000055898752,0.0007761511,0.000036306923,0.0000847936,0.000029864817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003407086,0.000008977118,0.00036156495,0.000634229,0.000051336654,0.0000018268192,0.00011915935,0.21454549,0.00022240332,0.00005332153,0.00027117156,0.7837271],"study_design_scores_gemma":[0.00048652606,0.000007439543,0.012425062,0.00015529641,0.000031179647,0.00006103244,0.0082330555,0.9783418,0.000002133757,0.000031326497,0.00008240416,0.0001427209],"about_ca_topic_score_codex":0.007993878,"about_ca_topic_score_gemma":0.003083351,"teacher_disagreement_score":0.7835844,"about_ca_system_score_codex":0.0002978413,"about_ca_system_score_gemma":0.000008443386,"threshold_uncertainty_score":0.998612},"labels":[],"label_agreement":null},{"id":"W2263281101","doi":"","title":"Business Model for BIM-based Services","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Business; Process management; Process (computing); Business process; Business model; Industrialization of services business model; Knowledge management; Marketing; Business process modeling; Engineering; Operations management; Computer science; Work in process","score_opus":0.007985104225038914,"score_gpt":0.18328671077335645,"score_spread":0.17530160654831753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2263281101","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059141386,0.000016591406,0.9349341,0.00015778317,0.00016067391,0.000111941474,0.0000027138535,0.0002585548,0.0052162632],"genre_scores_gemma":[0.97917724,0.000001431327,0.020144386,0.00014074639,0.000033406995,0.00009808373,0.000009714616,0.000008443204,0.00038658042],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981827,7.290637e-7,0.00005598753,0.000040815277,0.000026354503,0.000057863235],"domain_scores_gemma":[0.99983984,0.0000055857445,0.00000462943,0.00005375419,0.00008052996,0.000015665353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000085737465,0.000041642317,0.000033945238,0.00002564522,0.00001776932,0.000027664173,0.000031392236,0.000030084107,0.00018845135],"category_scores_gemma":[6.755714e-7,0.000033975455,0.0000142253675,0.000053566604,0.000004340499,0.000118837714,0.0000013497214,0.000015210432,0.000055231823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035051203,0.000010535891,0.00032977562,0.0002642731,0.000015610403,3.1953174e-8,0.0000600528,0.8842613,0.010580351,0.039328918,0.00549402,0.05965162],"study_design_scores_gemma":[0.00009845558,0.0000015258674,0.00029839334,0.0000044451626,0.0000022569996,2.3426325e-7,0.0000231019,0.9936526,0.0024313012,0.0026360175,0.00080248265,0.000049182],"about_ca_topic_score_codex":0.000037087837,"about_ca_topic_score_gemma":0.000045478257,"teacher_disagreement_score":0.92003584,"about_ca_system_score_codex":0.0000069213584,"about_ca_system_score_gemma":0.000005825341,"threshold_uncertainty_score":0.20634101},"labels":[],"label_agreement":null},{"id":"W2263603748","doi":"10.2495/bim150201","title":"Streamlining Building Information Model creation using Agile project management","year":2015,"lang":"en","type":"article","venue":"WIT transactions on the built environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Agile software development; Process management; Systems engineering; Project management; Application lifecycle management; Computer science; Product lifecycle; Engineering management; Knowledge management; Engineering; New product development; Software; Software engineering; Operations management; Business","score_opus":0.03142618444686427,"score_gpt":0.22735728310884212,"score_spread":0.19593109866197786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2263603748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06784085,0.000030161445,0.9275489,0.000071428294,0.00018123392,0.00033321374,0.000017896502,0.0001555907,0.0038207471],"genre_scores_gemma":[0.9832568,0.00007446949,0.016240567,0.000057113783,0.000022774255,0.00012034166,0.000013451713,0.000017977201,0.00019646819],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992843,0.000021901946,0.0002258033,0.00010444538,0.00021886572,0.00014468428],"domain_scores_gemma":[0.9996641,0.000012958432,0.000040053048,0.0002270403,0.000011857264,0.000043942626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013945323,0.00014275874,0.000079387544,0.00013568366,0.00015797904,0.000057959118,0.00009257553,0.0000576076,0.00005752738],"category_scores_gemma":[0.0000015383704,0.00011754843,0.000049394082,0.000110790126,0.000037114427,0.00041229182,0.0000032912528,0.0001488405,0.000053569744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010965391,0.000017094188,0.000006260844,0.0000091825,0.000040017727,1.9216044e-7,0.00046398403,0.9561989,0.00038585148,0.0016244105,0.00012765512,0.041115493],"study_design_scores_gemma":[0.00028638757,0.000026566227,0.000022899321,0.000028083325,0.00006051282,0.000007621621,0.0012431878,0.9873473,0.004174723,0.0009074046,0.00574301,0.0001522939],"about_ca_topic_score_codex":0.000033175962,"about_ca_topic_score_gemma":0.0000037886407,"teacher_disagreement_score":0.915416,"about_ca_system_score_codex":0.0003266078,"about_ca_system_score_gemma":0.000013521895,"threshold_uncertainty_score":0.47934857},"labels":[],"label_agreement":null},{"id":"W2264686095","doi":"","title":"IT And Systemic Approach For Managing Sustainable Urban Infrastructure Rehabilitation","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Asset (computer security); Process management; Task (project management); Risk analysis (engineering); Process (computing); Computer science; Sustainability; Asset management; Business; Engineering; Computer security; Systems engineering","score_opus":0.005180981412948721,"score_gpt":0.20287718776690375,"score_spread":0.19769620635395502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264686095","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93316716,0.0011436496,0.05993291,0.0004897514,0.00071889814,0.00049133785,0.000023627674,0.00011200393,0.0039206804],"genre_scores_gemma":[0.9924165,0.00010548251,0.007138473,0.000039306236,0.00013746957,0.000019794508,0.00000469007,0.000025486223,0.00011281727],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984973,0.000006938179,0.00051240256,0.00038497036,0.00031617944,0.00028222307],"domain_scores_gemma":[0.9991559,0.00021505031,0.00017801824,0.00008776983,0.00029833545,0.000064930035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038261118,0.00027782383,0.00032815264,0.00032723494,0.00017003073,0.00023229013,0.00015376939,0.000117115254,0.0000020453328],"category_scores_gemma":[0.00018935576,0.00023714457,0.000044573615,0.00018295855,0.00006769967,0.00019935875,0.00010431092,0.0002593626,2.4580682e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044505348,0.0001101575,0.033522442,0.005239363,0.00025220343,0.000008964348,0.0024927875,0.31291938,0.009503906,0.46459222,0.0378583,0.13305521],"study_design_scores_gemma":[0.00090076035,0.000062533145,0.023398863,0.0017060904,0.00003161648,0.000104196275,0.001564459,0.95607376,0.00027265723,0.01437636,0.0011338571,0.00037482553],"about_ca_topic_score_codex":0.0052185534,"about_ca_topic_score_gemma":0.00472225,"teacher_disagreement_score":0.6431544,"about_ca_system_score_codex":0.00020287035,"about_ca_system_score_gemma":0.00004579525,"threshold_uncertainty_score":0.9670475},"labels":[],"label_agreement":null},{"id":"W2264919365","doi":"","title":"An Enhanced Scheduling Technique for Modular Construction Manufacturing","year":2014,"lang":"en","type":"article","venue":"22nd Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Lean manufacturing; Manufacturing engineering; Advanced manufacturing; Lean project management; Manufacturing; Scheduling (production processes); Engineering; Computer science; Operations management; Business","score_opus":0.010165625758298496,"score_gpt":0.2254929933385704,"score_spread":0.2153273675802719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264919365","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35135144,0.000005123951,0.64526063,0.00010982467,0.0021807344,0.00041773016,0.00010057643,0.00010836639,0.0004655835],"genre_scores_gemma":[0.9313045,0.000008634748,0.06796439,0.000021478256,0.00037412922,0.00019423044,0.00006960783,0.000025747484,0.000037246584],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99891835,0.00002272432,0.00041018802,0.00025675757,0.00021306313,0.00017890592],"domain_scores_gemma":[0.9989653,0.00006360854,0.00019142279,0.00023198524,0.0004992893,0.00004834576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024230886,0.00019064784,0.00019053949,0.00014617923,0.00017800466,0.00008049606,0.00037299222,0.0001526834,0.00003621525],"category_scores_gemma":[0.00008106516,0.00017134417,0.0001584894,0.00006991806,0.0001952403,0.00054751313,0.000022778595,0.00016288435,0.0000013506345],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011278991,0.000023916728,0.0001977036,0.00011307236,0.00009961274,3.5969368e-8,0.00023611855,0.012673512,0.552824,0.25219467,0.000043510103,0.18148106],"study_design_scores_gemma":[0.0006338798,0.00011604145,0.00020684366,0.000119392294,0.000035244226,0.00004635672,0.0010055745,0.09767186,0.837244,0.060436588,0.0022357833,0.0002484379],"about_ca_topic_score_codex":0.000011631832,"about_ca_topic_score_gemma":0.00002342197,"teacher_disagreement_score":0.5799531,"about_ca_system_score_codex":0.00010860173,"about_ca_system_score_gemma":0.000029962923,"threshold_uncertainty_score":0.6987213},"labels":[],"label_agreement":null},{"id":"W2266839731","doi":"","title":"Using Interactive Workspaces for Team Design Project Meetings","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Workspace; Context (archaeology); Quality (philosophy); Work (physics); Sustainability; Project team; Knowledge management; Computer science; Engineering management; Engineering","score_opus":0.04143388139701694,"score_gpt":0.2939929762028603,"score_spread":0.2525590948058434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266839731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013253302,0.00003339937,0.963058,0.000008989581,0.00035858032,0.00023076794,6.00877e-7,0.00021059296,0.022845758],"genre_scores_gemma":[0.7850313,0.0000028127106,0.21445999,0.000021862883,0.00011869329,0.000015690499,0.0000011697589,0.0000142874205,0.00033420086],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996685,0.000005260843,0.00010081743,0.00006851051,0.000040728704,0.000116201016],"domain_scores_gemma":[0.9997897,0.00009144299,0.000016813854,0.000041454507,0.0000447376,0.00001582219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015374196,0.00006457099,0.000056411238,0.00007763931,0.000038579918,0.000028798093,0.000029814404,0.00004623239,0.000019677322],"category_scores_gemma":[0.00002187487,0.000055425786,0.000027438446,0.00009668694,0.000011249523,0.00014208528,0.0000031575244,0.000056476605,0.000003111423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005197562,0.000072692776,0.0015811903,0.00017270148,0.00037131246,0.0000029138193,0.0072924346,0.040571984,0.23900782,0.026343849,0.08564648,0.59841686],"study_design_scores_gemma":[0.00045777895,0.00007499724,0.000115542134,0.0000927455,0.0000343631,0.000035787554,0.0070226104,0.5940202,0.37153393,0.0010616689,0.02519081,0.0003596036],"about_ca_topic_score_codex":0.000025085279,"about_ca_topic_score_gemma":0.00003102859,"teacher_disagreement_score":0.771778,"about_ca_system_score_codex":0.00005474659,"about_ca_system_score_gemma":0.000010920339,"threshold_uncertainty_score":0.2260198},"labels":[],"label_agreement":null},{"id":"W2266859455","doi":"10.1007/978-3-319-07977-6_20","title":"Interoperable ICT Platform for Energy Efficient Smart Buildings","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Building automation; Energy consumption; Systems engineering; Efficient energy use; Information and Communications Technology; Engineering; Scope (computer science); Architectural engineering; Renewable energy; Automation; Architecture; Building information modeling; Computer science; Operations management; World Wide Web; Mechanical engineering","score_opus":0.009561186734784682,"score_gpt":0.18054105310410862,"score_spread":0.17097986636932394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266859455","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000033711567,0.00012875513,0.36874774,0.00001248343,0.0009876307,0.000077367855,0.000009550754,0.00023234262,0.6297704],"genre_scores_gemma":[0.033445887,0.00007513879,0.0017621255,0.00014440942,0.00040072034,0.00003762312,0.00007387888,0.00010196604,0.96395826],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993429,8.247481e-7,0.00023848415,0.00017433775,0.00009356367,0.00014984669],"domain_scores_gemma":[0.99965423,0.000024269606,0.000033596956,0.00016844845,0.00006936471,0.000050116276],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000047697766,0.00023007231,0.00021267276,0.00011897594,0.00004275449,0.000046014648,0.00009902148,0.00025781972,0.000978202],"category_scores_gemma":[0.0000029835003,0.00019749238,0.00013640967,0.000010747736,0.000024678593,0.000027099364,0.000014552404,0.00013303042,0.0000938122],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061582246,0.0000012088531,2.4497248e-7,0.00003972549,0.000050657523,1.7948126e-7,0.000014159562,0.0018927231,0.0001412146,0.8885228,0.020427998,0.088902906],"study_design_scores_gemma":[0.00014287955,0.00003632728,1.5949229e-7,0.00007853979,0.000022656024,0.000009781703,0.0000059870476,0.06134445,0.0018900058,0.0032570816,0.93297637,0.00023576745],"about_ca_topic_score_codex":0.00002859152,"about_ca_topic_score_gemma":0.000076904835,"teacher_disagreement_score":0.91254836,"about_ca_system_score_codex":0.00009817602,"about_ca_system_score_gemma":0.000012246659,"threshold_uncertainty_score":0.99993503},"labels":[],"label_agreement":null},{"id":"W2267552416","doi":"","title":"Spatio-Temporal Representation And Analysis In Infrastructure Systems","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Bridge (graph theory); Computer science; Visualization; Representation (politics); Data science; Data mining; Artificial intelligence","score_opus":0.004305465751746044,"score_gpt":0.19980798662286553,"score_spread":0.1955025208711195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2267552416","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95121384,0.00013057029,0.037331123,0.00001469854,0.00016539125,0.000059212627,0.000002918609,0.00009933287,0.0109829465],"genre_scores_gemma":[0.9991304,0.0000057899374,0.00054053514,0.0000026539124,0.000036592766,0.000006820851,0.000063894004,0.0000033710974,0.00020992957],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99968785,0.000009016081,0.00013329962,0.00006986856,0.000050905714,0.000049081573],"domain_scores_gemma":[0.99989736,0.000006389916,0.000012945021,0.000057490837,0.0000149764655,0.000010812979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000024702611,0.000045799945,0.00007495797,0.00017832009,0.000011795952,0.000037042813,0.000014798629,0.000041510153,0.000053287124],"category_scores_gemma":[0.0000016071344,0.00004150908,0.000016588623,0.00038926842,0.0000091004285,0.00010277385,0.0000024083502,0.000033907534,0.0000016756368],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015366415,0.0000014155346,0.8061896,0.000008380888,0.000024644825,7.7936363e-7,0.000032283013,0.18252791,0.00015226692,0.0075895763,0.0008788668,0.0025927513],"study_design_scores_gemma":[0.000108431275,0.0000023454063,0.52775484,0.0000026948378,0.000024583389,0.000004693325,0.00015248045,0.47017273,0.00025118713,0.00069201546,0.000770794,0.00006320159],"about_ca_topic_score_codex":0.0010686929,"about_ca_topic_score_gemma":0.0021447828,"teacher_disagreement_score":0.2876448,"about_ca_system_score_codex":0.000021835742,"about_ca_system_score_gemma":0.000002443666,"threshold_uncertainty_score":0.16926911},"labels":[],"label_agreement":null},{"id":"W2268437379","doi":"","title":"Engineering Analysis With Uncertainties And Complexities, Using Reasoning Approaches","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Leverage (statistics); Computer science; Constraint (computer-aided design); Engineering design process; Qualitative reasoning; Domain (mathematical analysis); Interval arithmetic; Computation; Artificial intelligence; Mathematics; Engineering; Algorithm","score_opus":0.01765781039109354,"score_gpt":0.17184963734792275,"score_spread":0.1541918269568292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2268437379","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54709166,0.0002504784,0.44049305,0.000007096789,0.000033208926,0.000034692184,0.00000204122,0.00025699078,0.011830774],"genre_scores_gemma":[0.96636343,0.0000020644256,0.033453047,0.0000022129414,0.0000399001,0.0000034397103,0.000010225971,0.000009408364,0.00011624391],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967694,0.0000032470862,0.00008658128,0.00008091281,0.00005757714,0.00009474723],"domain_scores_gemma":[0.9998888,0.000009767483,0.000010109802,0.000060619157,0.000013378492,0.00001731759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002739518,0.000083368825,0.00010289809,0.00013392343,0.000042142707,0.0000572777,0.000020285339,0.000027276596,0.000034093657],"category_scores_gemma":[0.0000010045563,0.000069320784,0.000020902735,0.00027086,0.00002760488,0.000099803954,0.0000043097716,0.0000483054,4.7163695e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000019053331,0.0000018761879,0.011096178,0.000019926687,0.00015960909,5.5270925e-7,0.000060006434,0.90381473,0.00035253103,0.08355524,0.000024299701,0.00091314496],"study_design_scores_gemma":[0.00006380956,0.0000035784574,0.005563951,0.000009139798,0.000102522106,0.000013849177,0.0003765627,0.9927509,0.00063029,0.00012669462,0.00024679577,0.00011193981],"about_ca_topic_score_codex":0.0003710598,"about_ca_topic_score_gemma":0.00023739986,"teacher_disagreement_score":0.4192718,"about_ca_system_score_codex":0.000027473414,"about_ca_system_score_gemma":0.0000041122485,"threshold_uncertainty_score":0.28268197},"labels":[],"label_agreement":null},{"id":"W2271222151","doi":"","title":"Evaluation of a case-based Reasoning Energy Prediction Tool for Commercial Buildings","year":2013,"lang":"en","type":"article","venue":"OakTrust (Texas A&M University Libraries)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Case-based reasoning; Artificial intelligence","score_opus":0.012215117525635952,"score_gpt":0.18299563406142805,"score_spread":0.1707805165357921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2271222151","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7037203,0.00008448194,0.2769777,0.00015016831,0.0007247994,0.0005844275,0.0001521324,0.00041508037,0.017190944],"genre_scores_gemma":[0.992867,0.0000055986357,0.0067233187,0.000023114373,0.00009661667,0.000008408541,0.0000862654,0.00001781243,0.00017188945],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992339,0.00006215862,0.00016470114,0.00015095112,0.00023780203,0.00015045733],"domain_scores_gemma":[0.99933577,0.00006527043,0.00006832331,0.00015564993,0.00032256584,0.000052418818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001797928,0.00012340354,0.00013779422,0.0001745033,0.00015654798,0.00005834311,0.00010111353,0.00014521784,0.0005656081],"category_scores_gemma":[0.00004030787,0.00014557302,0.00008024623,0.0002471066,0.00007298123,0.0009291837,0.000018540539,0.000083744584,0.000005900091],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025021145,0.00012224705,0.012898941,0.00020934243,0.00046478247,0.000011184956,0.0006813811,0.055608563,0.0032055564,0.43731606,0.03779823,0.4514335],"study_design_scores_gemma":[0.0025409309,0.00012471963,0.0061267214,0.0000779164,0.0004325836,0.000040678085,0.00078160875,0.92128474,0.011823049,0.0021196706,0.0542966,0.00035075747],"about_ca_topic_score_codex":0.0003038909,"about_ca_topic_score_gemma":0.000068416506,"teacher_disagreement_score":0.8656762,"about_ca_system_score_codex":0.00015127094,"about_ca_system_score_gemma":0.000117480646,"threshold_uncertainty_score":0.6193012},"labels":[],"label_agreement":null},{"id":"W2276297183","doi":"","title":"LOWELL and NELB, Architectural Records: Managing Design and Construction Records","year":2007,"lang":"en","type":"article","venue":"Archivaria","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Historical record; History; Architectural engineering; Engineering; Art history","score_opus":0.00812352889441691,"score_gpt":0.19827073070030768,"score_spread":0.19014720180589076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2276297183","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23044373,0.00013686321,0.7380893,0.00008025177,0.0007950743,0.00013804116,0.000001946859,0.00021469168,0.030100064],"genre_scores_gemma":[0.8903487,0.00010347251,0.10926898,0.00003382075,0.00013946966,0.0000049215682,0.0000039222296,0.000017332932,0.00007939472],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99938935,0.000028324645,0.0001745119,0.00015843335,0.000062380306,0.00018701525],"domain_scores_gemma":[0.9996745,0.000114408984,0.00002347363,0.0000976553,0.000012184966,0.00007778033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019696383,0.000119000535,0.00009859024,0.00013969262,0.00008831874,0.000048984944,0.000039703384,0.000044048495,0.000028942124],"category_scores_gemma":[0.000012473483,0.00011715701,0.00001833736,0.00009225296,0.000099554076,0.00011162701,0.000016778118,0.00017566756,0.0000063761277],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051522304,0.0000027068866,0.0023183574,0.000030171705,0.00002879329,0.00000526467,0.00042764973,0.0004427803,0.0027439666,0.0649634,0.0001463602,0.928839],"study_design_scores_gemma":[0.0017266128,0.0002590554,0.102627575,0.00019497953,0.00009961092,0.0029888528,0.0010602243,0.2638422,0.009437448,0.60744315,0.0092226975,0.0010975761],"about_ca_topic_score_codex":0.000055798682,"about_ca_topic_score_gemma":0.000019686233,"teacher_disagreement_score":0.92774147,"about_ca_system_score_codex":0.000017374372,"about_ca_system_score_gemma":0.000007009418,"threshold_uncertainty_score":0.47775242},"labels":[],"label_agreement":null},{"id":"W2277459328","doi":"","title":"Enhanced earned value management on practical construction projects through constrained project scheduling simulations","year":2011,"lang":"en","type":"article","venue":"PolyU Institutional Research Archive (Hong Kong Polytechnic University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earned value management; Project management; Scheduling (production processes); Computer science; Operations research; Operations management; Engineering; Project management triangle; Systems engineering; Project charter","score_opus":0.09012750692421444,"score_gpt":0.3121417691437903,"score_spread":0.22201426221957588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2277459328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06635856,0.000025531439,0.55977887,0.00013386025,0.0004917956,0.001185421,0.00011493318,0.00072883925,0.3711822],"genre_scores_gemma":[0.9043399,0.00011139353,0.09497976,0.000019503135,0.00009359132,0.000016828059,0.000062119696,0.000023551165,0.0003533595],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977361,0.00021996224,0.00027574936,0.0004833054,0.0006911079,0.00059379835],"domain_scores_gemma":[0.99901307,0.00024018153,0.00006307157,0.0003419405,0.00020215202,0.00013956199],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002643757,0.00025633693,0.00019309076,0.0013127493,0.00083423575,0.0000605004,0.00028682145,0.00016013073,0.0001280217],"category_scores_gemma":[0.00015988036,0.00028023665,0.0001131874,0.0014194888,0.0012924682,0.000718555,0.00012138682,0.00092738273,0.000087716515],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002682409,0.0001256057,0.00007781049,0.000056124532,0.0001545285,0.00008838853,0.00045828166,0.0050756093,0.008836499,0.97836477,0.000089563306,0.006404563],"study_design_scores_gemma":[0.015524591,0.0030337544,0.012129879,0.0038245209,0.00069691037,0.0013556641,0.029861458,0.34366047,0.32268164,0.18368427,0.07792129,0.00562556],"about_ca_topic_score_codex":0.00016743327,"about_ca_topic_score_gemma":0.00007564377,"teacher_disagreement_score":0.83798134,"about_ca_system_score_codex":0.0005212023,"about_ca_system_score_gemma":0.0005646045,"threshold_uncertainty_score":0.99996495},"labels":[],"label_agreement":null},{"id":"W2279728478","doi":"","title":"Improving Efficiency and Productivity in the Construction Sector through the use of Information Technology. CEFRIO Phase 4 - Final Report","year":2013,"lang":"en","type":"article","venue":"Open Repository and Bibliography (University of Liège)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Productivity; Phase (matter); Information technology; Business; Computer science; Economics; Economic growth","score_opus":0.017454537495069214,"score_gpt":0.2000559391700115,"score_spread":0.18260140167494227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279728478","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9901507,0.00009321747,0.008279818,0.00020953234,0.00010711295,0.00036713274,0.000004290324,0.000021365382,0.000766848],"genre_scores_gemma":[0.9976508,0.00011982572,0.0021993243,0.0000045976813,0.000008090436,0.000002258744,0.0000023706664,0.0000015525421,0.000011195058],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99958223,0.000035148078,0.00014077027,0.00009084468,0.00008624505,0.000064790016],"domain_scores_gemma":[0.9995751,0.000028834807,0.00013393833,0.00016161852,0.00008898206,0.000011553027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001354581,0.00006331729,0.00009467065,0.0012008193,0.00018928939,0.00010428382,0.00013240463,0.00006451331,0.0000060924112],"category_scores_gemma":[0.000001112174,0.0000474005,0.000028175335,0.0030321777,0.00034115114,0.00205594,0.000045373952,0.00012103064,1.8346499e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019119993,0.00024324632,0.87244433,0.000397848,0.00018466008,0.000023687073,0.007562131,0.0005031418,0.04923933,0.009129811,0.004171982,0.05590862],"study_design_scores_gemma":[0.0045219343,0.00093676336,0.8791363,0.0003373328,0.0003220726,0.0033458131,0.054655626,0.021785473,0.022299714,0.0035677038,0.008231498,0.0008597575],"about_ca_topic_score_codex":0.0024704803,"about_ca_topic_score_gemma":0.000021289768,"teacher_disagreement_score":0.055048864,"about_ca_system_score_codex":0.00000405674,"about_ca_system_score_gemma":0.000012423999,"threshold_uncertainty_score":0.37346438},"labels":[],"label_agreement":null},{"id":"W2280906953","doi":"10.14288/1.0106085","title":"Social effects of subdivision design : a study in micro-ecology.","year":2012,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ecology; Social ecology; Geography; Biology; Political science","score_opus":0.007558465048464831,"score_gpt":0.17358724542455828,"score_spread":0.16602878037609345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2280906953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99745506,0.00009905889,0.0017630539,0.0000031638897,0.00019006956,0.00023877378,0.0000047190433,0.000039737602,0.00020634501],"genre_scores_gemma":[0.99966824,0.000013790195,0.00025603524,0.0000019869292,0.000017243256,7.572558e-7,0.0000016121096,0.00000606039,0.000034252866],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99957216,0.000059145947,0.000081251994,0.00008162121,0.000077549346,0.00012826768],"domain_scores_gemma":[0.9997969,0.000038572893,0.000034678902,0.000060399394,0.000040107745,0.000029304412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012107911,0.000024912202,0.00015170655,0.00004927571,0.000052214295,0.000009236646,0.0000818524,0.00007991537,0.000023802912],"category_scores_gemma":[0.000008690833,0.00008861344,0.00004005281,0.0001752019,0.00006302354,0.00018322282,0.000021345224,0.000081595404,0.0000052183095],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012273443,0.00038959508,0.47738823,0.00015642666,0.00005621896,0.000023239016,0.002413956,0.00004308042,0.00564262,0.0000064897436,0.0013371891,0.5125307],"study_design_scores_gemma":[0.0007646099,0.0000665539,0.9971718,0.000031664098,0.000021074682,0.0000073568726,0.0015094766,0.00025523227,0.000038717822,0.000046953646,0.000013434022,0.00007309811],"about_ca_topic_score_codex":0.0064938157,"about_ca_topic_score_gemma":0.037320923,"teacher_disagreement_score":0.5197836,"about_ca_system_score_codex":0.000052399184,"about_ca_system_score_gemma":0.000012870606,"threshold_uncertainty_score":0.981675},"labels":[],"label_agreement":null},{"id":"W2281887716","doi":"10.7492/ijaec.2017.001","title":"Design Change Management Using BIM-based Visualization Model","year":2017,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Visualization; Computer science; Building information modeling; Systems engineering; Process management; Construction engineering; Business; Engineering; Operations management; Data mining","score_opus":0.021989146083959837,"score_gpt":0.24751584277380267,"score_spread":0.22552669668984285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2281887716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08790346,0.00011477406,0.9099707,0.00006739823,0.00174185,0.00006440933,0.0000030283327,0.000048712453,0.00008565793],"genre_scores_gemma":[0.86748844,0.00008422169,0.13205664,0.00001634835,0.00032992824,0.0000039701204,0.0000017675611,0.000016060503,0.0000026168104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993877,0.000009006283,0.0002274127,0.00007692571,0.00021099791,0.00008797033],"domain_scores_gemma":[0.9995761,0.00001272911,0.00014070292,0.00009304334,0.00012980566,0.000047636408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010183214,0.00011605317,0.00010685037,0.00032205562,0.00008434843,0.00014227859,0.00016207407,0.00005719728,0.000005746484],"category_scores_gemma":[0.000012095987,0.00011149836,0.000047881473,0.000034507066,0.000042488475,0.00027928338,0.000015608974,0.00013908526,3.8721885e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028583136,0.000005251738,0.00018131935,0.000020396954,0.00010496567,0.000008432018,0.00009720782,0.8406652,0.003325432,0.0055678356,0.000004731595,0.14999065],"study_design_scores_gemma":[0.00044553334,0.00002007798,0.0005214361,0.00014975906,0.000034383593,0.00036992878,0.000026742067,0.9923041,0.004429237,0.0013430883,0.0002394688,0.00011626725],"about_ca_topic_score_codex":0.0000024402532,"about_ca_topic_score_gemma":5.8526086e-7,"teacher_disagreement_score":0.779585,"about_ca_system_score_codex":0.000063324325,"about_ca_system_score_gemma":0.000013885009,"threshold_uncertainty_score":0.45467713},"labels":[],"label_agreement":null},{"id":"W2284147050","doi":"","title":"Upbrella and BIM: Rethinking the construction process in residential construction","year":2013,"lang":"fr","type":"article","venue":"Open Repository and Bibliography (University of Liège)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Process (computing); Construction engineering; Architectural engineering; Building information modeling; Environmental planning; Business; Engineering; Computer science; Operations management; Environmental science","score_opus":0.008816503493312667,"score_gpt":0.19643621596887778,"score_spread":0.1876197124755651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284147050","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98428875,0.0035030276,0.0008424726,0.0019119437,0.0012074598,0.00048680647,0.0000076372235,0.000031500193,0.0077204164],"genre_scores_gemma":[0.98984075,0.005839737,0.0039512655,0.000012077598,0.0000782905,0.00000204606,0.0000028694635,0.000008879411,0.00026408408],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989849,0.00015877545,0.00023456059,0.00028443892,0.00016225233,0.0001750717],"domain_scores_gemma":[0.9993394,0.00006321245,0.0001807964,0.00016618687,0.0001710566,0.00007935598],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023900603,0.0001612831,0.00022214673,0.0025107104,0.0005118039,0.00037850445,0.0002177504,0.0002488223,0.00014452307],"category_scores_gemma":[4.2949642e-7,0.00016773712,0.000071061615,0.004292448,0.0010768704,0.0016558036,0.00010608614,0.00033807894,0.000002940382],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013364572,0.00005141261,0.92999095,0.0005261477,0.0002588976,0.000025310215,0.004200848,0.00015342666,0.0046951217,0.03598463,0.003540925,0.020438714],"study_design_scores_gemma":[0.0024211637,0.00025920852,0.8727649,0.001443671,0.00042614655,0.0017979459,0.05947483,0.005098013,0.00454798,0.049573433,0.0013966282,0.0007960749],"about_ca_topic_score_codex":0.013954709,"about_ca_topic_score_gemma":0.0001938695,"teacher_disagreement_score":0.05722601,"about_ca_system_score_codex":0.000016127453,"about_ca_system_score_gemma":0.000039244245,"threshold_uncertainty_score":0.99261147},"labels":[],"label_agreement":null},{"id":"W2284574175","doi":"","title":"Decision making tool for seismic retrofitting of non-ductile reinforced concrete building","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Seismic retrofit; Retrofitting; Reinforced concrete; Construction engineering; Forensic engineering; Geology; Structural engineering; Engineering","score_opus":0.013266945142890599,"score_gpt":0.23324326226135478,"score_spread":0.2199763171184642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284574175","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4505412,0.000010915896,0.5416832,0.000001381624,0.00033471483,0.00010451742,0.000002020349,0.000092107,0.0072299317],"genre_scores_gemma":[0.84803885,0.0000036011245,0.15168852,0.000017843735,0.00006082393,0.000015498737,0.0000014691003,0.00001568213,0.00015770194],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938506,0.000003515594,0.0002992122,0.00010065599,0.00007714083,0.00013443008],"domain_scores_gemma":[0.9996472,0.00006598519,0.00005484253,0.00013481155,0.0000792519,0.000017934899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012752619,0.000089733716,0.0001280063,0.00008453756,0.000044802633,0.000012620935,0.00007574703,0.00007779443,0.00017259672],"category_scores_gemma":[0.000053765438,0.000084313186,0.00006887392,0.000099957295,0.000018391273,0.00018528874,0.000012196141,0.000068529414,0.000005489149],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021584977,0.0000015117699,0.0016613387,0.00032703727,0.00013555046,0.0000014134941,0.0017110845,0.013276756,0.55743706,0.081602775,0.0040213373,0.33960828],"study_design_scores_gemma":[0.0003218009,0.000044179178,0.0003021913,0.00013851146,0.000016289872,0.000011269933,0.00026992112,0.6865564,0.31066987,0.0009326389,0.000579402,0.00015752262],"about_ca_topic_score_codex":0.000010990715,"about_ca_topic_score_gemma":7.739617e-7,"teacher_disagreement_score":0.67327964,"about_ca_system_score_codex":0.000028722236,"about_ca_system_score_gemma":0.000009893686,"threshold_uncertainty_score":0.3438192},"labels":[],"label_agreement":null},{"id":"W2284936075","doi":"","title":"Efficiency in the provision of production specifications for the South African construction industry : : commentary","year":2005,"lang":"en","type":"article","venue":"Acta Structilia","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Workmanship; Inefficiency; Production (economics); System requirements specification; Computer science; National standard; Engineering; Operations management; Software engineering; Economics","score_opus":0.02173846815063285,"score_gpt":0.22735401901067662,"score_spread":0.20561555086004377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284936075","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.984559,0.00013314997,0.003239129,0.008657792,0.0011392778,0.0010196102,0.000035758552,0.00008886648,0.001127443],"genre_scores_gemma":[0.99767685,0.000018376522,0.0017550414,0.00004934326,0.00034871165,0.00010855067,0.000011740762,0.000011153416,0.000020208296],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992152,0.000034339337,0.0003035699,0.0001492822,0.00015667033,0.00014094109],"domain_scores_gemma":[0.99941593,0.0000963775,0.00008489887,0.0003203974,0.00006494824,0.000017464847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002143151,0.000109439505,0.00009624007,0.00009578161,0.00014990817,0.000027559703,0.000205378,0.00010286782,0.00003941737],"category_scores_gemma":[0.000046788744,0.000071602524,0.00004854846,0.00038570195,0.00015310354,0.00019093514,0.0000095911655,0.00032316128,0.0000016536477],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013979507,0.00017294203,0.016099487,0.00013605188,0.00010918649,2.5000259e-7,0.016383851,0.016955264,0.021389008,0.0233964,0.019501375,0.8857164],"study_design_scores_gemma":[0.0034301693,0.0004331982,0.2475849,0.00024534474,0.0004393401,0.00037475125,0.2222843,0.1269541,0.10724038,0.008275847,0.2812852,0.0014524813],"about_ca_topic_score_codex":0.000020824833,"about_ca_topic_score_gemma":0.00007404008,"teacher_disagreement_score":0.88426393,"about_ca_system_score_codex":0.00006492387,"about_ca_system_score_gemma":0.000019957723,"threshold_uncertainty_score":0.2919866},"labels":[],"label_agreement":null},{"id":"W2288806340","doi":"10.1016/j.buildenv.2016.03.002","title":"Sustainability and resiliency metrics for buildings – Critical review","year":2016,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; McMaster University; U.S. Environmental Protection Agency","keywords":"Sustainability; Certification; Architectural engineering; Engineering; Life-cycle assessment; Construction engineering; Environmental resource management; Risk analysis (engineering); Environmental economics; Business; Production (economics); Environmental science","score_opus":0.009710414519837993,"score_gpt":0.23470749236380328,"score_spread":0.22499707784396528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2288806340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2154074,0.06655371,0.7069531,0.009500344,0.0003112719,0.0006477046,0.000023624543,0.00018731793,0.0004155085],"genre_scores_gemma":[0.9625952,0.028599342,0.008515177,0.00006997435,0.000042479554,0.00007081787,5.5650867e-7,0.000011506571,0.00009493502],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99952525,0.000009172669,0.00012499056,0.00015113082,0.000062985884,0.0001264671],"domain_scores_gemma":[0.9997101,0.00012165863,0.000009789039,0.00008915742,0.0000108124605,0.000058524194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017688981,0.00007681611,0.00009656837,0.000032425254,0.000060059345,0.000012345986,0.000026846788,0.000039000177,0.000025639201],"category_scores_gemma":[0.00018874466,0.00005474566,0.000021872343,0.000033404674,0.00008289963,0.00007653399,0.000016712269,0.000032652246,0.0000010844849],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005417475,0.000011130773,0.001591704,0.0010250786,0.000010428075,4.8380525e-7,0.000024324281,0.000023325785,0.0040009525,0.039361518,0.0018645804,0.9520811],"study_design_scores_gemma":[0.000969463,0.00024181306,0.010321402,0.001208052,0.00018187666,0.00006988177,0.00015145399,0.0028512338,0.008513468,0.06995433,0.90480596,0.0007310556],"about_ca_topic_score_codex":0.000002112124,"about_ca_topic_score_gemma":1.5779528e-7,"teacher_disagreement_score":0.95135,"about_ca_system_score_codex":0.00007579198,"about_ca_system_score_gemma":0.0000032770874,"threshold_uncertainty_score":0.2232463},"labels":[],"label_agreement":null},{"id":"W2290179840","doi":"","title":"Investigating the impact of building information modeling on collaboration in the architecture, engineering, construction and operations industry","year":2015,"lang":"en","type":"article","venue":"Espace École de technologie supérieure (École de technologie supérieure)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Artifact (error); Context (archaeology); Building information modeling; Knowledge management; Design science research; Project management; Design science; Computer science; Process (computing); Management science; Engineering; Process management; Information system; Systems engineering; Operations management","score_opus":0.01429177910919271,"score_gpt":0.26242109027971755,"score_spread":0.24812931117052484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290179840","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86376685,0.00024115785,0.13149574,0.0018269015,0.0001594107,0.0008394362,0.000039453524,0.0014020598,0.00022898073],"genre_scores_gemma":[0.98868346,0.000053823333,0.010707014,0.00011677762,0.00005164703,0.00032285642,0.000022973161,0.00003557161,0.0000058490114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981212,0.00008249932,0.0006081054,0.0002913554,0.00035144915,0.00054541795],"domain_scores_gemma":[0.99868685,0.00015568125,0.00014031901,0.0006903858,0.00023625775,0.000090522146],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0008263997,0.00042107387,0.0003359343,0.0008078401,0.000219886,0.00024778448,0.0006596397,0.001142426,0.0000037313819],"category_scores_gemma":[0.0020654881,0.00030499545,0.00008953637,0.0021755795,0.0003935116,0.00061463966,0.00011319528,0.0022366443,0.0000028668394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001683611,0.00002124755,0.007337571,0.000029964498,0.000034905228,0.0000034800373,0.0013182462,0.968555,0.0040277974,0.013148125,0.0003656909,0.005141154],"study_design_scores_gemma":[0.0006481654,0.00029987592,0.0014202234,0.00013153815,0.000030455427,0.00021421607,0.020704119,0.9615082,0.009526906,0.0047445907,0.0003886211,0.00038306124],"about_ca_topic_score_codex":0.00023353923,"about_ca_topic_score_gemma":0.00028953218,"teacher_disagreement_score":0.12491663,"about_ca_system_score_codex":0.0004103362,"about_ca_system_score_gemma":0.000348888,"threshold_uncertainty_score":0.9999402},"labels":[],"label_agreement":null},{"id":"W2290402900","doi":"","title":"A Decision-Making Model For Surety Underwriters In The Construction Industry Based On Fuzzy Expert Systems","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Underwriting; Surety; Process (computing); Computer science; Fuzzy logic; Decision-making models; Risk analysis (engineering); Decision-making; Operations research; Management science; Actuarial science; Artificial intelligence; Business; Engineering; Operations management; Finance","score_opus":0.014159491194868633,"score_gpt":0.2353643139504429,"score_spread":0.22120482275557427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290402900","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8760169,0.000462745,0.11899648,0.00044981323,0.0015592698,0.000422641,0.000040623338,0.000084235515,0.0019672983],"genre_scores_gemma":[0.995075,0.00005606707,0.0045308457,0.0001142991,0.0001519865,0.000026391746,0.0000029461821,0.00002608686,0.000016367001],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981331,0.000012116479,0.00063425425,0.00039841182,0.0005334952,0.00028860325],"domain_scores_gemma":[0.9988615,0.00053489424,0.00020749096,0.00012553697,0.00021737003,0.000053227322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055240165,0.00031735704,0.00034612065,0.00040827785,0.00016415108,0.00028286027,0.0002522589,0.00020930896,0.000002118228],"category_scores_gemma":[0.00021288249,0.00024120942,0.00006455036,0.00025376468,0.000071567025,0.00015209719,0.000059182832,0.00051053206,5.1541853e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020350136,0.000053510004,0.0039153374,0.00019738056,0.000036068803,0.000003928595,0.00032925187,0.8892602,0.0008550338,0.050763816,0.0035330616,0.05084891],"study_design_scores_gemma":[0.0007127528,0.000034183668,0.0065404777,0.0028505633,0.000012132911,0.00004566824,0.00050007825,0.98162526,0.0001036414,0.00712075,0.00019566524,0.0002588072],"about_ca_topic_score_codex":0.0052367826,"about_ca_topic_score_gemma":0.018262481,"teacher_disagreement_score":0.11905812,"about_ca_system_score_codex":0.00024568455,"about_ca_system_score_gemma":0.00008216682,"threshold_uncertainty_score":0.9996517},"labels":[],"label_agreement":null},{"id":"W2290474416","doi":"","title":"Framework for Lifecycle Status Tracking and Visualization of Constructed Facility Components","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Visualization; Schedule; Component (thermodynamics); Computer science; Process (computing); Identification (biology); Real-time computing; Systems engineering; Radio-frequency identification; Tracking system; Engineering; Data mining; Artificial intelligence","score_opus":0.021451929122587626,"score_gpt":0.2746289220915752,"score_spread":0.25317699296898755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290474416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4408119,0.0000423178,0.55827683,0.0000024432632,0.00013828599,0.000059262715,0.000020824114,0.00006846942,0.00057967124],"genre_scores_gemma":[0.9839291,0.000016026544,0.015985098,0.0000096129725,0.00001553485,0.000002061788,0.000030691393,0.0000046700084,0.0000071897575],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99959093,0.0000053619146,0.00018085845,0.00006749027,0.0000560066,0.00009932229],"domain_scores_gemma":[0.9997198,0.00008163936,0.000023692333,0.000051766125,0.00008648311,0.00003664279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006774749,0.00005300444,0.00007892442,0.00003990972,0.000027220147,0.000011155345,0.000014030077,0.000072654824,0.00005032382],"category_scores_gemma":[0.000045301906,0.000053612854,0.000017709719,0.000082926854,0.00003537716,0.00007212477,0.0000033462866,0.000039124126,0.0000010322399],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008516169,0.000039055936,0.14282711,0.00033566708,0.000086645516,4.669588e-7,0.0007121253,0.0005166582,0.095309876,0.4165313,0.00013020242,0.34342575],"study_design_scores_gemma":[0.0015311792,0.0000722817,0.33978188,0.00009738687,0.000050611186,0.000022388112,0.0018848423,0.06420117,0.5398989,0.047655944,0.004365289,0.00043818066],"about_ca_topic_score_codex":0.0000087968265,"about_ca_topic_score_gemma":0.000016470922,"teacher_disagreement_score":0.5431172,"about_ca_system_score_codex":0.000015014081,"about_ca_system_score_gemma":0.000006009634,"threshold_uncertainty_score":0.21862687},"labels":[],"label_agreement":null},{"id":"W2290795325","doi":"10.3963/jmpm.v3i3.164","title":"Implementation of a BIM Solution in a Small Construction Company","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Process (computing); Building information modeling; Software deployment; Process management; Business; Quality (philosophy); Operations management; Risk analysis (engineering); Computer science; Engineering","score_opus":0.019137847860295615,"score_gpt":0.25206122372659634,"score_spread":0.2329233758663007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290795325","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5341042,0.00014157704,0.46402845,0.00010358626,0.00041490345,0.00021968821,0.0000032630262,0.000021973816,0.00096229854],"genre_scores_gemma":[0.9921591,0.00021831846,0.0075371074,0.000005727918,0.00004000257,0.000009331222,6.7816876e-7,0.000007680849,0.000022017166],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9992063,0.000027394648,0.0004722816,0.00006145993,0.00013151226,0.000101061094],"domain_scores_gemma":[0.999647,0.000010004122,0.00018386246,0.00006941035,0.000073598465,0.000016116393],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001990193,0.00007509791,0.00013159732,0.00042797244,0.000013119093,0.000010339334,0.00006671458,0.000030939816,0.000025291849],"category_scores_gemma":[0.0000023428581,0.000055391418,0.00005480284,0.000147095,0.000023175447,0.00019650506,0.000012036079,0.000059365793,0.0000015750767],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050610666,0.000028595106,0.005554431,0.000109492925,0.0001134273,0.0000045676125,0.00034312875,0.00073719065,0.013262813,0.008391599,0.00031206553,0.9710921],"study_design_scores_gemma":[0.045118287,0.0026192858,0.31678912,0.004936697,0.001178596,0.001525033,0.026591634,0.14504145,0.26101384,0.16708356,0.025482038,0.0026204484],"about_ca_topic_score_codex":0.00002275678,"about_ca_topic_score_gemma":0.00014623959,"teacher_disagreement_score":0.96847165,"about_ca_system_score_codex":0.0001572267,"about_ca_system_score_gemma":0.00002169989,"threshold_uncertainty_score":0.22587965},"labels":[],"label_agreement":null},{"id":"W2291225526","doi":"10.5555/2888619.2889076","title":"Online simulation modeling of prefabricated wall panel production using RFID system","year":2015,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Prefabrication; Discrete event simulation; Frame (networking); Computer science; Real-time computing; Production (economics); Radio-frequency identification; Event (particle physics); Simulation modeling; Modeling and simulation; Control (management); Simulation; Engineering; Embedded system; Civil engineering; Operating system","score_opus":0.1344940826086737,"score_gpt":0.28602735082417036,"score_spread":0.15153326821549665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291225526","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46093762,0.000026882344,0.53790516,0.000012443834,0.00048411364,0.00014030263,0.0000061283413,0.00022479774,0.00026252863],"genre_scores_gemma":[0.99757874,0.0000014232419,0.0021575484,0.000005597093,0.00014267932,0.0000045198826,0.00005277341,0.0000219244,0.000034798348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894047,0.000042901684,0.00047080536,0.00019867561,0.0002193349,0.00012778939],"domain_scores_gemma":[0.9988292,0.0000236449,0.00010752141,0.00021135039,0.00076476036,0.00006356295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000120795376,0.00014987795,0.00018205946,0.00015558796,0.000035371806,0.000034835983,0.00008699901,0.000103921244,0.00001697879],"category_scores_gemma":[0.000056904886,0.00015162777,0.000042626027,0.00022160921,0.000024801018,0.00041419358,0.000014582802,0.00011350678,0.000009336444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024471074,0.000017666767,0.00036351415,0.00006304541,0.00001966267,1.8273336e-7,0.0005644047,0.99221796,0.0022121272,0.00029147556,0.0000042491088,0.004221237],"study_design_scores_gemma":[0.00025582756,0.000020763586,0.00017603592,0.00015391834,0.00002766227,0.0000043519062,0.0006207506,0.99731594,0.001043622,0.00017555273,0.00005966029,0.00014590702],"about_ca_topic_score_codex":0.000051187868,"about_ca_topic_score_gemma":0.000016886983,"teacher_disagreement_score":0.5366411,"about_ca_system_score_codex":0.00016920788,"about_ca_system_score_gemma":0.000049782153,"threshold_uncertainty_score":0.6183201},"labels":[],"label_agreement":null},{"id":"W2292918313","doi":"10.5555/2888619.2889077","title":"Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction","year":2015,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Task (project management); Ambiguity; Process (computing); Computer science; Control (management); Order (exchange); Cost estimate; Work (physics); Operations research; Industrial engineering; Engineering; Systems engineering; Business","score_opus":0.05085340466961483,"score_gpt":0.28873144677474805,"score_spread":0.23787804210513322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2292918313","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0616415,0.00007658507,0.93479705,0.00006084089,0.0014448728,0.0009315788,0.00011327366,0.00049588026,0.0004383954],"genre_scores_gemma":[0.98023003,0.0000028265288,0.018847344,0.00008641109,0.00022821363,0.00009721129,0.00023182834,0.00004581098,0.0002302954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845874,0.00009176932,0.00052793184,0.00038099862,0.00026923648,0.00027131263],"domain_scores_gemma":[0.9985471,0.00029886194,0.00014308534,0.00025387722,0.0006046339,0.00015245056],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019903196,0.00029617772,0.00027454543,0.00024946258,0.000121186305,0.00016835816,0.00012718953,0.0002422153,0.00012228226],"category_scores_gemma":[0.00025872412,0.00032220254,0.00013048161,0.00021008625,0.000102719714,0.0006749975,0.000015608632,0.00020084716,0.000108918226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015555118,0.000031412685,0.0008877835,0.00001969065,0.0000365856,6.6225016e-7,0.0006066455,0.9342994,0.0021416317,0.00016836464,0.00011099116,0.0615413],"study_design_scores_gemma":[0.0029915078,0.00007507097,0.0040132054,0.00006319843,0.000049307782,0.0000019536965,0.00026844264,0.9859531,0.0016827151,0.00010583268,0.004449948,0.00034570374],"about_ca_topic_score_codex":0.0000135600785,"about_ca_topic_score_gemma":0.00007527171,"teacher_disagreement_score":0.9185886,"about_ca_system_score_codex":0.00022627377,"about_ca_system_score_gemma":0.00012609741,"threshold_uncertainty_score":0.999923},"labels":[],"label_agreement":null},{"id":"W2295128706","doi":"10.5555/2873021.2873029","title":"Digital campus innovation project: integration of building information modelling with building performance simulation and building diagnostics","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada); Carleton University","funders":"","keywords":"Building information modeling; Interoperability; Systems engineering; Building science; Facility management; Computer science; Building design; Asset management; Construction engineering; Engineering management; Engineering; Architectural engineering","score_opus":0.02088980364241859,"score_gpt":0.2358411866974149,"score_spread":0.21495138305499634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2295128706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48454294,0.000022369211,0.5141483,0.0000048413312,0.00009553044,0.00013590447,0.0000033673493,0.00010895442,0.00093777827],"genre_scores_gemma":[0.95210856,0.000027242399,0.04771884,0.000009079367,0.00005156302,0.000016819038,0.000042075666,0.000015053824,0.00001076371],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990621,0.000007476945,0.00044725218,0.00010761569,0.00023721546,0.00013829538],"domain_scores_gemma":[0.9991607,0.00006242614,0.0001406329,0.0000990355,0.0005025951,0.00003460378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016686531,0.00015776829,0.00013903386,0.0004400325,0.00006484647,0.00016234494,0.000051003557,0.00009464277,0.0000016088245],"category_scores_gemma":[0.0000762653,0.00013646713,0.000013506134,0.00068319147,0.000039455696,0.0032580786,0.00001541643,0.00013953977,9.284386e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022991215,0.0000047436283,0.0019807357,0.000055047385,0.000012029462,8.827032e-8,0.00049860653,0.87084603,0.0008991088,0.018330207,0.0000176621,0.10733276],"study_design_scores_gemma":[0.00034913234,0.00008019078,0.00016094396,0.00013191266,0.000014029851,0.000011811182,0.00056921045,0.98557204,0.011740065,0.0004898769,0.00070873514,0.00017203386],"about_ca_topic_score_codex":0.000021296193,"about_ca_topic_score_gemma":0.0000029126527,"teacher_disagreement_score":0.46756563,"about_ca_system_score_codex":0.000100006175,"about_ca_system_score_gemma":0.000045580065,"threshold_uncertainty_score":0.5564968},"labels":[],"label_agreement":null},{"id":"W2296373031","doi":"10.4271/2016-01-1190","title":"Development of the HyStEP Device","year":2016,"lang":"en","type":"article","venue":"SAE technical papers on CD-ROM/SAE technical paper series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"National Renewable Energy Laboratory; California Energy Commission","keywords":"Computer science","score_opus":0.010388881765293638,"score_gpt":0.2146721967079864,"score_spread":0.20428331494269275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2296373031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88548243,0.00033963728,0.000021248903,0.0026167468,0.0009228948,0.0008055317,0.000041614,0.002854316,0.106915556],"genre_scores_gemma":[0.9942561,0.00008633196,0.0045635286,0.00032447596,0.000079135134,0.00018077559,0.0000041960852,0.000066000335,0.00043944846],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.9975693,0.00005754878,0.00087786024,0.00045035483,0.00058425,0.0004606788],"domain_scores_gemma":[0.99855703,0.00018611287,0.0001274904,0.000886633,0.00009528108,0.00014745099],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028024378,0.00042359706,0.0004448737,0.000101006895,0.00021623835,0.000030599644,0.00073052704,0.0004713494,0.00044796997],"category_scores_gemma":[0.00020476134,0.00024587367,0.00026222083,0.00049829547,0.00056353083,0.0002714922,0.00017497732,0.00048118396,0.0001224412],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034503526,0.00004594509,0.00013544259,0.000035121433,0.000033189586,0.0000013719796,0.00002595386,0.0000061192877,0.93171424,0.018568104,0.0011763548,0.048223644],"study_design_scores_gemma":[0.00034791182,0.000095250725,0.8356291,0.00031801732,0.000029379395,0.000037213256,0.000069994756,4.3040508e-8,0.006656049,0.0009757819,0.15549126,0.00034995863],"about_ca_topic_score_codex":0.000004801249,"about_ca_topic_score_gemma":0.031760715,"teacher_disagreement_score":0.9250582,"about_ca_system_score_codex":0.00026966853,"about_ca_system_score_gemma":0.00009334405,"threshold_uncertainty_score":0.99999934},"labels":[],"label_agreement":null},{"id":"W2296875920","doi":"10.7492/ijaec.2015.013","title":"A Methodology to Ensure the Consideration of Flexibility and Robustness in the Selection of Facility Renewal Projects","year":2015,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Robustness (evolution); Flexibility (engineering); Selection (genetic algorithm); Computer science; Operations research; Engineering; Operations management; Engineering management; Risk analysis (engineering); Systems engineering; Reliability engineering; Business; Management; Economics; Artificial intelligence","score_opus":0.03431796222631273,"score_gpt":0.26162363603079425,"score_spread":0.22730567380448152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2296875920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8543995,0.00011427778,0.1445464,0.00027366614,0.000532523,0.00008560325,0.0000060530606,0.00000888451,0.000033080425],"genre_scores_gemma":[0.98544747,0.000014973175,0.01443358,0.000008282293,0.000086823486,0.0000038006149,0.0000011980816,0.0000030540982,8.038751e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924064,0.000103986546,0.0003358422,0.00006802284,0.00019392734,0.00005758322],"domain_scores_gemma":[0.99937034,0.00017260647,0.00009853588,0.00005335686,0.00027759123,0.000027543627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069372373,0.000077924386,0.00014055343,0.00019779429,0.00001506892,0.000017748263,0.00007864635,0.00005504758,0.0000021662806],"category_scores_gemma":[0.00027893222,0.00005079179,0.00003052525,0.00014339677,0.00007301024,0.000072313545,0.000010621882,0.00021569639,3.4407826e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002646656,0.000019137036,0.010803447,0.00007069458,0.00013600053,0.0000025777558,0.005269996,0.8182458,0.025182666,0.004438517,0.00002611859,0.13554037],"study_design_scores_gemma":[0.0080003925,0.0022407193,0.17838141,0.0010236588,0.00040565,0.036678877,0.022725936,0.43862116,0.27120864,0.036452014,0.002971682,0.0012898578],"about_ca_topic_score_codex":0.000026429772,"about_ca_topic_score_gemma":0.000042665575,"teacher_disagreement_score":0.37962466,"about_ca_system_score_codex":0.00003193556,"about_ca_system_score_gemma":0.000041617724,"threshold_uncertainty_score":0.2071229},"labels":[],"label_agreement":null},{"id":"W2299109757","doi":"10.1061/ciegag.0000941","title":"Research Briefs: Canadian Research Center Seeks Best Ways of Reinforcing Masonry","year":2008,"lang":"en","type":"article","venue":"Civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Masonry; Center (category theory); Engineering; Research center; Forensic engineering; Civil engineering; Political science; Law","score_opus":0.06568011536768528,"score_gpt":0.2623629009636148,"score_spread":0.19668278559592953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2299109757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74289316,0.0020694097,0.022195857,0.0010257744,0.002053814,0.0007247292,0.000057839614,0.0008154232,0.228164],"genre_scores_gemma":[0.9987405,0.00015401174,0.00045550035,0.000025203977,0.00027018375,0.000030040716,0.0000111479385,0.00004786858,0.0002655524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983968,0.00002489218,0.00026516116,0.00016997677,0.00045471152,0.000688442],"domain_scores_gemma":[0.99907106,0.00010795906,0.000010997406,0.00030283333,0.0003025848,0.00020458401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005341743,0.00013063509,0.00015372303,0.0008654707,0.00019465835,0.000031352134,0.00021222726,0.00017870737,0.00013865187],"category_scores_gemma":[0.00009934126,0.0001486624,0.000051989427,0.00080939755,0.00010298979,0.00020216948,0.000031112948,0.000986984,0.00009321398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028982788,0.0000613682,0.0094223805,0.0015306445,0.00032036655,0.00054205063,0.0075068916,0.6565107,0.065141924,0.047000434,0.18781789,0.024116354],"study_design_scores_gemma":[0.0008467455,0.00019370085,0.0032445951,0.0008127435,0.000011023957,0.0005397892,0.0011739194,0.4166516,0.03740175,0.00024387168,0.5380336,0.00084663986],"about_ca_topic_score_codex":0.0070852665,"about_ca_topic_score_gemma":0.010689799,"teacher_disagreement_score":0.35021573,"about_ca_system_score_codex":0.00033421558,"about_ca_system_score_gemma":0.00013920717,"threshold_uncertainty_score":0.9995266},"labels":[],"label_agreement":null},{"id":"W2301628738","doi":"10.14288/1.0063135","title":"Integrating data models, analysis and multidimensional visualizations : a unified construction project management arena","year":2010,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Data science; Process management; Engineering","score_opus":0.011883905924690168,"score_gpt":0.19421912648053857,"score_spread":0.18233522055584842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2301628738","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.827896,0.00003934944,0.16901544,0.000009441456,0.0001870508,0.00016121709,0.00025277224,0.00014477556,0.0022939765],"genre_scores_gemma":[0.96506876,0.00010343243,0.034407087,0.0000036347901,0.000013245959,6.982746e-7,0.00025749378,0.0000076082397,0.00013802516],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993971,0.000017740773,0.00011268225,0.00024822645,0.00012476179,0.00009951146],"domain_scores_gemma":[0.9995247,0.00001538193,0.00004950094,0.00026203357,0.00010503973,0.000043353626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008532012,0.000040187722,0.00014186089,0.00014246664,0.00017109148,0.00006846684,0.0001392765,0.00007648206,0.000046897538],"category_scores_gemma":[0.0000066485654,0.000121120465,0.00004139877,0.00055677147,0.00015196754,0.00045881764,0.000088097506,0.00013643192,0.0000011738098],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005743933,0.00005015708,0.009541779,0.000105875355,0.0007034583,0.00001744796,0.000288805,0.0012987357,0.001164075,0.0015041042,0.0011802304,0.98413956],"study_design_scores_gemma":[0.00051005563,0.000011532071,0.35507813,0.00005340944,0.0004220973,0.000065565866,0.003992412,0.63838494,0.0000035113242,0.0008542177,0.00041636734,0.0002077679],"about_ca_topic_score_codex":0.014389606,"about_ca_topic_score_gemma":0.26409432,"teacher_disagreement_score":0.98393184,"about_ca_system_score_codex":0.000018290435,"about_ca_system_score_gemma":0.000021216723,"threshold_uncertainty_score":0.9921737},"labels":[],"label_agreement":null},{"id":"W2305381679","doi":"10.14288/1.0089967","title":"The integral building-landscape : developing a language of integration","year":2009,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Linguistics; Computer science; Philosophy","score_opus":0.004209850121915747,"score_gpt":0.1651786989913875,"score_spread":0.16096884886947177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2305381679","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9773095,0.00031243498,0.01936655,0.00006611945,0.00015431039,0.00007363915,0.0000141299715,0.00008579792,0.002617515],"genre_scores_gemma":[0.9980466,0.00012180833,0.0016496499,0.000008724568,0.00001837074,1.8997677e-7,0.0000067942838,0.0000043818745,0.0001435051],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9995938,0.000014648928,0.000102711856,0.00008852666,0.00010005863,0.000100266734],"domain_scores_gemma":[0.9997034,0.000021362639,0.000047957365,0.00010611199,0.000096487194,0.000024660152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000801899,0.000028590834,0.000106263615,0.000030954972,0.00010941333,0.000045948604,0.00014510317,0.000058971993,0.00002190965],"category_scores_gemma":[0.000014995534,0.00007078916,0.00005871664,0.00019702192,0.00007319492,0.00016117835,0.000010779434,0.00009754528,0.0000021918756],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034393279,0.0000059114705,0.00038506257,0.00001091262,0.000013919552,0.000003516357,0.00032433704,0.000029986182,0.0031521108,0.00022757963,0.0009919733,0.99485123],"study_design_scores_gemma":[0.00045289082,0.00006279496,0.9806623,0.00022788123,0.000023653549,0.000052380194,0.008901282,0.0069935014,0.00024723215,0.0017337174,0.00047017672,0.00017218769],"about_ca_topic_score_codex":0.004314784,"about_ca_topic_score_gemma":0.06774516,"teacher_disagreement_score":0.99467903,"about_ca_system_score_codex":0.000035832847,"about_ca_system_score_gemma":0.00002450667,"threshold_uncertainty_score":0.9492661},"labels":[],"label_agreement":null},{"id":"W2307011503","doi":"10.1016/j.aei.2016.03.001","title":"Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry","year":2016,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":129,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Ontology; Information model; Computer science; Domain (mathematical analysis); Frame (networking); Building model; Semantics (computer science); Vocabulary; Building design; Systems engineering; Software engineering; Engineering; Architectural engineering; Simulation","score_opus":0.009765036172923854,"score_gpt":0.20954577400709343,"score_spread":0.19978073783416958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2307011503","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21898644,0.00007302483,0.77953744,0.000053884676,0.00051933306,0.00027923778,0.000046148,0.00027073358,0.00023375446],"genre_scores_gemma":[0.72791773,0.000015656795,0.27178448,0.000041772924,0.000055596185,0.00013489902,0.000025298814,0.000021922988,0.0000026332887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988588,0.0000098101345,0.0005256521,0.0001132517,0.00015697062,0.00033551574],"domain_scores_gemma":[0.99935365,0.00014765367,0.000079914695,0.00030239756,0.00006506255,0.000051322106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014828738,0.00022592154,0.0002275029,0.00014222311,0.000066835084,0.000037769103,0.0001993458,0.0002895311,0.0000050731273],"category_scores_gemma":[0.000065284315,0.0001614123,0.00006128531,0.00029071615,0.000040183255,0.0006842076,0.000012624561,0.00036936338,0.0000030664062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001066843,0.00001138154,0.00031731,0.00011180839,0.000028013357,3.376973e-7,0.0005833615,0.9335318,0.0024726158,0.040117197,0.00002986361,0.022785608],"study_design_scores_gemma":[0.00089373544,0.00002407693,0.00021421746,0.00013450948,0.000016287533,0.000012471669,0.0008294305,0.98838705,0.0044868155,0.0010842147,0.0036502813,0.0002669071],"about_ca_topic_score_codex":0.000006700428,"about_ca_topic_score_gemma":0.000009074575,"teacher_disagreement_score":0.5089313,"about_ca_system_score_codex":0.00011218048,"about_ca_system_score_gemma":0.000022742415,"threshold_uncertainty_score":0.6582203},"labels":[],"label_agreement":null},{"id":"W2308998501","doi":"","title":"Improving Efficiency and Productivity in the Construction Sector through the use of Information Technology. CEFRIO Phase 3 - RESEARCH PROTOCOL FOR THE PILOT PROJECTS : Final Report","year":2012,"lang":"en","type":"article","venue":"Open Repository and Bibliography (University of Liège)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Productivity; Phase (matter); Protocol (science); Engineering management; Business; Operations management; Engineering; Process management; Economics; Economic growth; Medicine","score_opus":0.10682483258345468,"score_gpt":0.30839774940512976,"score_spread":0.20157291682167508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2308998501","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9315831,0.000097581826,0.02089303,0.00054959615,0.00020381792,0.0456188,0.000014466809,0.000041767962,0.0009978581],"genre_scores_gemma":[0.99706143,0.000023141216,0.001799144,0.0000029222463,0.000026580421,0.0010698515,0.0000014588229,0.0000025795343,0.000012913285],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993887,0.00008760035,0.00015222433,0.00009643799,0.00015122723,0.00012383258],"domain_scores_gemma":[0.9993371,0.00013319138,0.00013578215,0.00021149589,0.00016873771,0.000013704268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081891444,0.00006780733,0.00009035864,0.001282621,0.0005022896,0.00010772237,0.0001936634,0.00005801227,0.0000018901629],"category_scores_gemma":[0.0000049923947,0.000042202508,0.000029800029,0.0040053017,0.0005317413,0.0017577679,0.00006921509,0.00019402991,6.071584e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024929317,0.00093229517,0.8573592,0.0016381318,0.00029514928,0.000009252962,0.019914962,0.0002613017,0.03519592,0.025876654,0.008491401,0.04753282],"study_design_scores_gemma":[0.016407952,0.005987103,0.6352277,0.00097633235,0.00053719326,0.0037621392,0.14803939,0.024151107,0.06248158,0.0033090445,0.09769971,0.0014207627],"about_ca_topic_score_codex":0.0010789274,"about_ca_topic_score_gemma":0.000025991356,"teacher_disagreement_score":0.22213149,"about_ca_system_score_codex":0.00000771105,"about_ca_system_score_gemma":0.00003133909,"threshold_uncertainty_score":0.38632563},"labels":[],"label_agreement":null},{"id":"W2312795577","doi":"10.1108/ci-07-2015-0040","title":"System model for analysing construction labour productivity","year":2016,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Regression analysis; Variance (accounting); Work (physics); Computer science; Engineering; Predictive modelling; Operations research; Reliability engineering; Machine learning","score_opus":0.015638254349887606,"score_gpt":0.21988066819164787,"score_spread":0.20424241384176026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312795577","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29930183,0.000016443359,0.69669276,0.00016463701,0.001871521,0.00027101772,0.0000528264,0.0007037199,0.0009252299],"genre_scores_gemma":[0.9630133,0.000007648003,0.036071986,0.000013344676,0.00042635403,0.00014121585,0.000030946638,0.000032928725,0.00026225435],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869233,0.000024154753,0.00056415255,0.00031403484,0.00017920232,0.00022613669],"domain_scores_gemma":[0.9987245,0.000033983742,0.00018164446,0.00025211507,0.00077219127,0.00003552549],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002619473,0.00020068637,0.00020656033,0.00053541415,0.00021203565,0.000064586064,0.00007439911,0.0001662502,0.000029114764],"category_scores_gemma":[0.00008203395,0.00016967818,0.000065365886,0.0010617889,0.00016447506,0.0007607987,0.000008963806,0.00009942806,0.000016020811],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023328728,0.0000047797394,0.0012516907,0.0000997773,0.000047997037,9.8726225e-8,0.000033298475,0.003013319,0.08756045,0.5722204,0.00024191708,0.33550295],"study_design_scores_gemma":[0.0023925754,0.0000582534,0.0015403137,0.00032067555,0.00013574082,0.00045163208,0.0009421507,0.759349,0.18171024,0.045262113,0.006830109,0.0010072093],"about_ca_topic_score_codex":0.0000025168615,"about_ca_topic_score_gemma":0.0000053723916,"teacher_disagreement_score":0.7563357,"about_ca_system_score_codex":0.0003570281,"about_ca_system_score_gemma":0.000067515204,"threshold_uncertainty_score":0.69192755},"labels":[],"label_agreement":null},{"id":"W2313173268","doi":"10.1061/40937(261)36","title":"Towards Supporting Construction Equipment Operation Using Collaborative Agent-Based Systems","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Lift (data mining); Computer science; Task (project management); Multi-agent system; Kinematics; Systems engineering; Engineering; Artificial intelligence","score_opus":0.016264232457012726,"score_gpt":0.262367563427994,"score_spread":0.24610333097098128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313173268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20021574,0.000082997816,0.78212094,0.000019321675,0.002000913,0.0002512808,0.000008884645,0.00032361914,0.01497628],"genre_scores_gemma":[0.9820798,0.0000036602555,0.01761881,0.000026776734,0.00015579771,0.000011314732,0.000033405016,0.000016257456,0.000054176908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990751,0.00002072434,0.0003871748,0.00013151816,0.00018111533,0.00020434023],"domain_scores_gemma":[0.99960446,0.000014610469,0.000060078713,0.00009354986,0.0001634608,0.00006385021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030213388,0.00012693022,0.00011922041,0.00013322957,0.00011534897,0.00010880115,0.000039385402,0.00009281899,0.00014087565],"category_scores_gemma":[0.000010967971,0.00012143801,0.000030624313,0.00025614334,0.00003563777,0.00022909955,0.0000052867777,0.000073641764,0.00001416634],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054981596,0.000037415204,0.0033290507,0.00018642776,0.00013753415,0.000015020879,0.0007830777,0.5410418,0.24743712,0.08074989,0.0010112586,0.1252164],"study_design_scores_gemma":[0.00053812773,0.00004257939,0.00019138488,0.00004885053,0.000028822793,0.000048272374,0.0057131937,0.75427425,0.23497815,0.000084982355,0.0037430741,0.00030827615],"about_ca_topic_score_codex":0.00006499844,"about_ca_topic_score_gemma":0.00004907783,"teacher_disagreement_score":0.78186405,"about_ca_system_score_codex":0.00027890393,"about_ca_system_score_gemma":0.00008261607,"threshold_uncertainty_score":0.4952098},"labels":[],"label_agreement":null},{"id":"W2313374887","doi":"10.1061/41000(315)6","title":"Implementation of Building Information Modeling (BIM) on the Renovation of the Art Gallery of Alberta in Edmonton, Alberta","year":2008,"lang":"en","type":"article","venue":"Structures Congress 2008","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; LEAPS; Architecture; Argument (complex analysis); Architectural engineering; Upgrade; Exhibition; Computer science; Information model; Engineering; Software engineering; Business; Operations management; Visual arts","score_opus":0.01095569078014433,"score_gpt":0.2247394657942013,"score_spread":0.21378377501405696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313374887","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9953061,0.00003229175,0.0017038315,0.00009054513,0.00040982256,0.00023872305,0.0000107466985,0.000009205874,0.00219874],"genre_scores_gemma":[0.99969727,0.000032423282,0.0001554625,0.000025918376,0.000021954938,0.000012340365,0.000017362063,0.000008105269,0.000029155899],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99901253,0.000030906802,0.0005567328,0.000069316906,0.00022668063,0.000103832455],"domain_scores_gemma":[0.9993332,0.00007994994,0.00021633081,0.00021830612,0.00014046734,0.000011730307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000769288,0.000110550325,0.00014903139,0.00014098012,0.000054109067,0.000006766296,0.00014834663,0.0000729008,0.00008357005],"category_scores_gemma":[0.000051009258,0.00007426089,0.000056091576,0.0002787954,0.00007546141,0.00026552225,0.00001640418,0.0001293575,6.874752e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001307641,0.000021182215,0.037481286,0.00024289929,0.00017578222,2.9114202e-7,0.00825761,0.7594737,0.035756376,0.13426852,0.0039597256,0.020231899],"study_design_scores_gemma":[0.0020643407,0.000131286,0.11503717,0.00040090916,0.000057408328,0.00004405402,0.0030064327,0.3397269,0.5280947,0.00937613,0.0015586588,0.000501984],"about_ca_topic_score_codex":0.0015683429,"about_ca_topic_score_gemma":0.0031934176,"teacher_disagreement_score":0.49233833,"about_ca_system_score_codex":0.000034444685,"about_ca_system_score_gemma":0.00003849351,"threshold_uncertainty_score":0.30282712},"labels":[],"label_agreement":null},{"id":"W2313811027","doi":"10.3141/2573-13","title":"Innovative Design, Traffic Management, and Construction of Concrete Overlay Technology: Canadian Municipal Application","year":2016,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Regional Municipality of Waterloo; Cement Association of Canada; University of Waterloo","funders":"","keywords":"Overlay; Transport engineering; Access management; Heavy traffic; Engineering; Civil engineering; Computer science","score_opus":0.036116180982500364,"score_gpt":0.30252692430844624,"score_spread":0.2664107433259459,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313811027","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9797322,0.00027931575,0.017060682,0.0014551638,0.00030479723,0.000812277,0.00006982174,0.000045160323,0.00024056523],"genre_scores_gemma":[0.9920254,0.0016517704,0.006034991,0.000008086413,0.000046538935,0.00008135148,0.0000059953163,0.0000313058,0.000114582544],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9970326,0.00030399146,0.00091376534,0.000228679,0.001050965,0.00046998973],"domain_scores_gemma":[0.9966967,0.0003048262,0.00022815866,0.00028816678,0.0022786483,0.0002034929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015494586,0.00017178188,0.00028065997,0.0018547383,0.00026523042,0.00003599951,0.00042916628,0.00021294669,0.00008520193],"category_scores_gemma":[0.000049450122,0.00012092246,0.00009126879,0.0026530034,0.0009909814,0.0004478828,0.0000031712707,0.0008039828,0.00000614739],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013274554,0.000054642693,0.17909127,0.0006852559,0.0008857964,0.000058612826,0.0034763727,0.0037618836,0.057480406,0.14168109,0.0038927828,0.60760444],"study_design_scores_gemma":[0.005332665,0.0010579827,0.8723745,0.0015338793,0.00016212715,0.000011041094,0.010029658,0.0025728063,0.03664674,0.024679564,0.0449073,0.0006917436],"about_ca_topic_score_codex":0.00677482,"about_ca_topic_score_gemma":0.07565267,"teacher_disagreement_score":0.6932832,"about_ca_system_score_codex":0.0002538246,"about_ca_system_score_gemma":0.00026756458,"threshold_uncertainty_score":0.9998391},"labels":[],"label_agreement":null},{"id":"W2314499624","doi":"10.1061/9780784412480.135","title":"Design-Build of Wastewater Force-Main in North Bay Village: Lessons Learned from the Design-Build Team's Perspective","year":2012,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Miami; Bay; Civil engineering; Geography; Engineering; Environmental science","score_opus":0.028777681745738602,"score_gpt":0.24165515895354964,"score_spread":0.21287747720781103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314499624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46585998,0.0007101531,0.51969284,0.0009993552,0.0006208672,0.00065918715,0.00003108121,0.00025490654,0.0111716185],"genre_scores_gemma":[0.99194443,0.000053360014,0.007376289,0.000048680988,0.00013217311,0.00004482499,0.000006495111,0.000029691724,0.00036404145],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989494,0.00014577639,0.00026542775,0.00016870078,0.00016178255,0.00030892],"domain_scores_gemma":[0.999319,0.00024696675,0.00004196903,0.0002716821,0.000057576817,0.0000627641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027977832,0.00018758902,0.00019766328,0.00009003081,0.000064549036,0.000031050342,0.0001761148,0.00011784435,0.00039224152],"category_scores_gemma":[0.00004463085,0.00012635643,0.00006904074,0.00026063208,0.000066415116,0.00026588302,0.000026402997,0.00024710334,0.000043574804],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005807418,0.00041397486,0.12733385,0.00008479402,0.0009552907,0.000008270898,0.06589757,0.32791644,0.2957712,0.10846045,0.017896486,0.054680925],"study_design_scores_gemma":[0.00364212,0.00029812788,0.07941468,0.00019567067,0.0002587873,0.00005028949,0.062552236,0.1645026,0.66127694,0.02036512,0.0054702773,0.0019731754],"about_ca_topic_score_codex":0.00052638334,"about_ca_topic_score_gemma":0.0013302793,"teacher_disagreement_score":0.5260845,"about_ca_system_score_codex":0.00013664104,"about_ca_system_score_gemma":0.00002930498,"threshold_uncertainty_score":0.5152666},"labels":[],"label_agreement":null},{"id":"W2315420192","doi":"10.1061/40475(278)97","title":"Assessing the Quality of a Construction Schedule","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Computer science; Scheduling (production processes); Quality (philosophy); Work (physics); Production schedule; Operations research; Risk analysis (engineering); Operations management; Engineering; Business","score_opus":0.023000472512406868,"score_gpt":0.29126839913270774,"score_spread":0.26826792662030086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315420192","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84680444,0.00004254992,0.013501629,0.000056808538,0.00015278153,0.000029340368,7.0044206e-7,0.00010100422,0.13931078],"genre_scores_gemma":[0.99645704,0.000010176107,0.0033111009,0.000014360187,0.000030041021,0.0000027971332,9.187142e-7,0.000003041776,0.00017052311],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99970317,0.000017864993,0.0001386995,0.000035981146,0.000060445207,0.000043815944],"domain_scores_gemma":[0.9998562,0.000019167424,0.000012938629,0.000081332284,0.000021126545,0.000009258391],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000878839,0.00003445307,0.000048096237,0.000013379334,0.000033197375,0.000024776486,0.000030707855,0.000027613542,0.0017728661],"category_scores_gemma":[0.0000046608893,0.000023045272,0.000024558569,0.00008128479,0.000053002423,0.0001504408,0.0000012966119,0.000053004638,0.000020661746],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024618441,0.00000632954,0.0030419556,0.000019785424,0.000021607133,4.6623484e-8,0.00009796003,0.0022579452,0.015352673,0.092645384,0.00023350098,0.88632035],"study_design_scores_gemma":[0.0018198867,0.000060129772,0.25746578,0.00012932696,0.00008079067,0.0001888929,0.012979633,0.20693937,0.43748736,0.032910608,0.0489513,0.0009869308],"about_ca_topic_score_codex":0.00002288952,"about_ca_topic_score_gemma":0.000009059561,"teacher_disagreement_score":0.8853334,"about_ca_system_score_codex":0.000008885527,"about_ca_system_score_gemma":0.000006826718,"threshold_uncertainty_score":0.99913967},"labels":[],"label_agreement":null},{"id":"W2315497027","doi":"10.1061/40475(278)11","title":"Creating Special Purpose Simulation Tools with Simphony","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Implementation; Computer science; Flexibility (engineering); Domain (mathematical analysis); Systems engineering; Software engineering; Point (geometry); Engineering","score_opus":0.008198032639244242,"score_gpt":0.20034719952359772,"score_spread":0.1921491668843535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315497027","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42685914,0.000010810777,0.020623285,0.000011892654,0.00012564796,0.000084333464,0.00000198497,0.00030707216,0.55197585],"genre_scores_gemma":[0.99542487,0.00000523291,0.0014808679,0.000026708847,0.00061899424,0.000006024357,0.0000075776725,0.000010201754,0.0024195104],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999685,0.000004336571,0.000093276125,0.00006502401,0.000072618735,0.00007977705],"domain_scores_gemma":[0.9998624,0.000021859327,0.000006478747,0.0000659573,0.00001891698,0.000024402216],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000017522132,0.00006368726,0.00005221735,0.0000237511,0.000043161705,0.00005735915,0.000024696796,0.00003576437,0.007924645],"category_scores_gemma":[0.000003326406,0.000051127718,0.0000152508455,0.000088918445,0.000011285294,0.00023417166,0.0000011280642,0.00005110569,0.00016781705],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010640679,0.0000029080304,0.00022739402,0.000002748917,0.0000062656254,6.794703e-7,0.00010590723,0.38943005,0.00017467013,0.0013753957,0.00024370525,0.60841966],"study_design_scores_gemma":[0.0006008799,0.000064613865,0.005284742,0.00002687607,0.000017561815,0.00001944024,0.00024888568,0.8534959,0.0050300867,0.00052649627,0.1343662,0.00031834072],"about_ca_topic_score_codex":0.000008375217,"about_ca_topic_score_gemma":0.000039496193,"teacher_disagreement_score":0.6081013,"about_ca_system_score_codex":0.000024432204,"about_ca_system_score_gemma":0.0000057898933,"threshold_uncertainty_score":0.99298227},"labels":[],"label_agreement":null},{"id":"W2315595975","doi":"10.1061/40937(261)100","title":"Design of a Distributed Mixed Reality System for Construction Simulation","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Bridge (graph theory); Virtual reality; Animation; Human–computer interaction; Computer animation; Virtual machine; Simulation; Computer graphics (images); Operating system","score_opus":0.024338066969811497,"score_gpt":0.24514022631060858,"score_spread":0.22080215934079708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315595975","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01515311,0.000010104813,0.9830698,0.0000046837017,0.00049382326,0.00024536,0.000024718693,0.0002594353,0.0007389636],"genre_scores_gemma":[0.9794856,6.6682884e-7,0.020408617,9.698607e-7,0.00004097706,0.000009520184,0.000039620125,0.0000061752903,0.000007853253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953747,0.000011031126,0.00024551616,0.000062831554,0.000061038714,0.00008209959],"domain_scores_gemma":[0.9996322,0.00010844975,0.00004027597,0.00007473586,0.00012166661,0.00002267363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022141049,0.000057415073,0.00008684311,0.00004815126,0.000028011378,0.0000070161855,0.00002338247,0.00007127544,0.000009174429],"category_scores_gemma":[0.000017210821,0.00005420597,0.000024574592,0.000111491085,0.000021398844,0.000070072776,0.0000016225264,0.00002733089,0.0000014386662],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010234151,0.000008496979,0.00017902908,0.0002183721,0.00003983182,1.8146443e-7,0.00004740638,0.81058425,0.03303478,0.051648624,0.00024317483,0.10389351],"study_design_scores_gemma":[0.0003274127,0.000027404467,0.0008192469,0.000018577148,0.000018249348,0.000006995389,0.00043289506,0.7932079,0.20413098,0.00049188064,0.00043727536,0.00008118359],"about_ca_topic_score_codex":0.0000095637,"about_ca_topic_score_gemma":0.00000768685,"teacher_disagreement_score":0.96433246,"about_ca_system_score_codex":0.00007124597,"about_ca_system_score_gemma":0.0000075961902,"threshold_uncertainty_score":0.22104554},"labels":[],"label_agreement":null},{"id":"W2316164171","doi":"10.1061/40513(279)104","title":"IFC-Based Data Model for Integrated Maintenance Management","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; University of British Columbia","funders":"National Research Council Canada; Public Works and Government Services Canada","keywords":"Interoperability; Computer science; Information model; Systems engineering; Data modeling; Domain (mathematical analysis); Software engineering; Object model; Object (grammar); Engineering; World Wide Web","score_opus":0.022019512377449414,"score_gpt":0.22339314494210366,"score_spread":0.20137363256465424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316164171","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013603565,0.000016771908,0.9273425,0.00011032849,0.000110415815,0.00016955308,0.000060958777,0.00033712958,0.07049203],"genre_scores_gemma":[0.82629234,0.00005943233,0.13920629,0.00039307424,0.000042660828,0.00011141704,0.00046183993,0.000030891046,0.033402093],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999586,0.000002487162,0.00011352722,0.00013149748,0.00005030527,0.00011618703],"domain_scores_gemma":[0.99963224,0.0000063687353,0.0000056198314,0.0003097831,0.000021553431,0.000024438745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000045711644,0.00007641764,0.000057829602,0.00003260182,0.00002729684,0.00002413981,0.0001646147,0.000032589956,0.00066397485],"category_scores_gemma":[0.0000016518699,0.00006346779,0.000020189504,0.00007633606,0.000012956254,0.00011492314,0.000005923396,0.000042527445,0.000055214263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028022649,0.000013657678,0.000009167874,0.0000438824,0.000034584096,5.932638e-7,0.000016115624,0.27653846,0.00010533847,0.024462525,0.1333374,0.56541026],"study_design_scores_gemma":[0.0002737559,0.0000041330445,0.00000911563,0.000011917312,0.000008996788,7.459125e-7,0.000026617723,0.9114719,0.0002904914,0.00062814786,0.0871954,0.00007875914],"about_ca_topic_score_codex":0.000006533883,"about_ca_topic_score_gemma":0.000039034985,"teacher_disagreement_score":0.824932,"about_ca_system_score_codex":0.000026572681,"about_ca_system_score_gemma":0.000007775873,"threshold_uncertainty_score":0.7270059},"labels":[],"label_agreement":null},{"id":"W2316255756","doi":"10.1061/40513(279)71","title":"Visual Representation of Project Planning and Control Data","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Project management; Project planning; Scheduling (production processes); Construction management; Control (management); Pre-construction services; Work breakdown structure; Representation (politics); Process (computing); Construction engineering; Systems engineering; Engineering; Civil engineering; Project charter; Artificial intelligence; Operations management; Programming language","score_opus":0.027864971812588433,"score_gpt":0.3007425413240152,"score_spread":0.2728775695114267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316255756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9092613,0.00024796382,0.0408806,0.000026724227,0.00009931654,0.00014346045,0.000017926079,0.00016562926,0.049157117],"genre_scores_gemma":[0.99928284,0.000014765898,0.00048932823,0.000007720455,0.000024054722,0.0000022344886,0.00001865313,0.0000028167356,0.00015760126],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980175,0.0000054207135,0.00007390076,0.000053722364,0.00003408841,0.000031112366],"domain_scores_gemma":[0.99989206,0.000012236583,0.0000060314032,0.00007558753,0.000007266589,0.000006822483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000232639,0.000026186684,0.00004242845,0.000021986003,0.000009664531,0.000008488026,0.000025974477,0.000017326878,0.0001688883],"category_scores_gemma":[0.0000035689068,0.000022827106,0.0000042547476,0.000045716904,0.000010933588,0.00013235847,0.000002735456,0.000022666027,0.0000025778327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059736063,0.000014534506,0.024654446,0.00004832205,0.00007923583,0.0000013555923,0.00055390614,0.0042654425,0.018416183,0.0015044591,0.0057495316,0.94465286],"study_design_scores_gemma":[0.00080052,0.00003835349,0.015803402,0.000023765666,0.000024345882,0.000025229378,0.00058112625,0.96448714,0.0123965135,0.00015329188,0.005548239,0.000118101096],"about_ca_topic_score_codex":0.00003738711,"about_ca_topic_score_gemma":0.000004371016,"teacher_disagreement_score":0.96022165,"about_ca_system_score_codex":0.0000020850973,"about_ca_system_score_gemma":0.0000033553258,"threshold_uncertainty_score":0.18492085},"labels":[],"label_agreement":null},{"id":"W2316944648","doi":"10.1061/40937(261)24","title":"Building Intelligent Applications for Construction Equipment Management","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Data management; Construction management; Decision support system; Knowledge extraction; Information management; Knowledge management; Data science; Systems engineering; Risk analysis (engineering); Engineering; Data mining; Business","score_opus":0.010980341257005692,"score_gpt":0.2492954399004515,"score_spread":0.2383150986434458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316944648","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001481628,0.00004941086,0.95144707,0.000023413459,0.00044486197,0.00047229006,0.0000018451055,0.00028917738,0.04579033],"genre_scores_gemma":[0.51872367,0.000044488475,0.48013473,0.000045898127,0.00017444768,0.00036433956,0.000011303548,0.000016961145,0.00048418881],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995374,0.00000132818,0.00017483198,0.000093289134,0.000062827436,0.00013034214],"domain_scores_gemma":[0.99981165,0.000015885764,0.00001425237,0.00008959166,0.00003207655,0.000036525194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010431347,0.000067593886,0.000048324957,0.00009426898,0.0000584931,0.000020570924,0.00004587405,0.00003509428,0.000072280236],"category_scores_gemma":[8.046661e-7,0.000066963796,0.0000289218,0.000106011394,0.000018765099,0.000052443633,0.0000071074946,0.000035028377,0.000021054519],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020407103,0.0000035670625,0.000015195429,0.000027137765,0.000015963122,6.393593e-8,0.000007737579,0.0004370447,0.0020166612,0.48453903,0.00023448345,0.51270103],"study_design_scores_gemma":[0.000245009,0.00002198407,0.00015153404,0.0000132964915,0.000030833675,0.000017927108,0.0007599416,0.0067772237,0.20511281,0.028492551,0.7581611,0.00021574798],"about_ca_topic_score_codex":0.0000012363806,"about_ca_topic_score_gemma":0.0000047037047,"teacher_disagreement_score":0.75792664,"about_ca_system_score_codex":0.00008685214,"about_ca_system_score_gemma":0.0000021719113,"threshold_uncertainty_score":0.27307045},"labels":[],"label_agreement":null},{"id":"W2317345966","doi":"10.1061/40513(279)93","title":"A Computer Model for Scheduling of Highway Construction","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Duration (music); Scheduling (production processes); Computer science; Construction management; Transport engineering; Operations research; Engineering; Civil engineering; Operations management","score_opus":0.010341392935148514,"score_gpt":0.20001911964364144,"score_spread":0.18967772670849292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2317345966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15273662,0.000015516816,0.841072,0.000015091049,0.00016594946,0.000058550988,0.0000044375033,0.0001395874,0.0057922485],"genre_scores_gemma":[0.7532054,0.000008522558,0.24647203,0.000012807115,0.000052769916,0.000008151449,0.0000035801327,0.00000556001,0.00023115298],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997475,0.0000016292142,0.000114092334,0.000049611153,0.000032525666,0.00005461702],"domain_scores_gemma":[0.99989104,0.000007376614,0.000007956442,0.00004963643,0.000029812429,0.0000141691735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000018831028,0.0000433474,0.000059352304,0.000028238645,0.000017023469,0.000006881769,0.000022416194,0.000038264334,0.00023053521],"category_scores_gemma":[5.663269e-7,0.000040342027,0.000031981694,0.00003841194,0.000018912839,0.00007000841,0.0000010575233,0.000027459422,0.0000072260455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055486275,0.0000027995286,0.000025784775,0.000018308374,0.000010957457,1.3995452e-8,0.0000474119,0.681433,0.00137889,0.034773566,0.0002589612,0.28204477],"study_design_scores_gemma":[0.00015569375,0.000007790051,0.00001544048,0.0000068840554,0.000004484943,0.000004552119,0.000013357079,0.9921703,0.005322216,0.0017854774,0.00046781855,0.000046014677],"about_ca_topic_score_codex":0.0000021270155,"about_ca_topic_score_gemma":0.0000028404388,"teacher_disagreement_score":0.6004688,"about_ca_system_score_codex":0.000008926621,"about_ca_system_score_gemma":0.000005913535,"threshold_uncertainty_score":0.2524199},"labels":[],"label_agreement":null},{"id":"W2318705081","doi":"10.1061/9780784413029.068","title":"Spatio-Temporal Progress Estimation for Highway Construction","year":2013,"lang":"en","type":"article","venue":"Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Computer science; Global Positioning System; Scheduling (production processes); Track (disk drive); Transport engineering; Project management; Operations research; Systems engineering; Engineering; Telecommunications; Operations management","score_opus":0.007240007372470643,"score_gpt":0.2043342078940571,"score_spread":0.19709420052158647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318705081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33247992,0.00014373404,0.66452867,0.000038810293,0.0014046255,0.00038004745,0.000002041137,0.0007145127,0.00030763148],"genre_scores_gemma":[0.92661476,0.0000022012218,0.073065616,0.000004545776,0.00015296688,0.00009090528,0.000032909324,0.00002927375,0.000006792543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925,0.0000061422065,0.0002926417,0.0001453233,0.00008450403,0.00022137063],"domain_scores_gemma":[0.99970025,0.00005483707,0.000035654786,0.00010531251,0.00006221682,0.000041744737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093004805,0.0001452245,0.00013933929,0.00018239833,0.000042208678,0.00007872849,0.00007203029,0.00008817009,0.000029160123],"category_scores_gemma":[0.000028593715,0.0001637388,0.000039634386,0.00021022021,0.000022382676,0.00023972426,0.000011096085,0.00013518054,0.000015467645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016800146,0.000006691353,0.0065063266,0.00016716046,0.0000127186,3.5336257e-7,0.00013741871,0.88096213,0.00033404818,0.003947643,0.00038454917,0.10753925],"study_design_scores_gemma":[0.00025828177,0.000012647367,0.0067423955,0.000107495594,0.0000037813497,0.000012640913,0.000026763058,0.9905591,0.00096140313,0.00039300972,0.00074805476,0.00017443569],"about_ca_topic_score_codex":0.0000132944115,"about_ca_topic_score_gemma":0.000026087673,"teacher_disagreement_score":0.59413487,"about_ca_system_score_codex":0.00010114932,"about_ca_system_score_gemma":0.000010625922,"threshold_uncertainty_score":0.66770744},"labels":[],"label_agreement":null},{"id":"W2318836624","doi":"10.1061/40704(2003)23","title":"Changes and the Unchangeable: Computers in Construction","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Sketch; Computer science; Engineering ethics; Architectural engineering; Data science; Construction engineering; Risk analysis (engineering); Engineering; Business","score_opus":0.006713060257665344,"score_gpt":0.1711554156367186,"score_spread":0.16444235537905325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318836624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53452396,0.0022229864,0.11922607,0.0025146224,0.004975637,0.00065801933,0.0000033821777,0.00063049677,0.3352448],"genre_scores_gemma":[0.99712443,0.00015955295,0.002510357,0.000092107584,0.000022698647,0.0000135252685,6.234575e-7,0.0000038031612,0.00007288509],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980986,0.000017407554,0.000048768994,0.000041941184,0.000027926564,0.000054070155],"domain_scores_gemma":[0.9999143,0.000022878863,0.000005280723,0.0000397984,0.000007378716,0.000010381266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000068323774,0.000039306615,0.000046499328,0.000037837064,0.000020298703,0.00001703377,0.000014477717,0.00002465077,0.000052693435],"category_scores_gemma":[0.0000048867696,0.000026041653,0.000005666491,0.000088661094,0.00006233453,0.000035414163,0.0000019878923,0.00004723528,0.00000288253],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004131128,0.0000014670212,0.0015157181,0.000009674548,0.000008303802,3.0651842e-7,0.00027658552,0.00028939237,0.00014235347,0.88675857,0.0005408985,0.11045259],"study_design_scores_gemma":[0.016834008,0.00011846304,0.012955935,0.00019891713,0.00007563398,0.0013260012,0.01794982,0.5086672,0.029490938,0.16259572,0.24827561,0.0015117843],"about_ca_topic_score_codex":0.000016784892,"about_ca_topic_score_gemma":0.00029083225,"teacher_disagreement_score":0.7241629,"about_ca_system_score_codex":0.000010536439,"about_ca_system_score_gemma":0.0000023320836,"threshold_uncertainty_score":0.10619477},"labels":[],"label_agreement":null},{"id":"W2319056016","doi":"10.1061/9780784413517.008","title":"Estimating the Size of Temporary Facilities in Construction Site Layout Planning Using Simulation","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Duration (music); Process (computing); Task (project management); Estimation; Resource (disambiguation); Economic shortage; Work (physics); Space (punctuation); Site planning; Productivity; Simulation modeling; Industrial engineering; Operations research; Systems engineering; Engineering; Civil engineering","score_opus":0.04771770382829251,"score_gpt":0.3299777864641125,"score_spread":0.28226008263582003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319056016","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95041853,0.00022307265,0.04376796,0.00004493818,0.001812825,0.0003288797,0.000023336843,0.00014966357,0.0032307815],"genre_scores_gemma":[0.99209774,0.000007801027,0.0075059473,0.0000058344285,0.00026845332,0.000025930767,0.000010045017,0.000023312861,0.000054953565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99786234,0.00040830375,0.0005994946,0.00025788098,0.00052430324,0.00034770358],"domain_scores_gemma":[0.99820256,0.0008295695,0.00013763129,0.00033150552,0.00043061614,0.00006810015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012690716,0.00018242683,0.00026311824,0.00041313627,0.00028239674,0.00011496335,0.0001732672,0.00017299187,0.0001776973],"category_scores_gemma":[0.00063946657,0.00016037413,0.000063673324,0.0005121838,0.000889935,0.00047460257,0.000047421312,0.0005811487,0.000017347476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039610193,0.000007452511,0.08200865,0.00016987837,0.000028246146,0.0000012535779,0.00059180456,0.849332,0.00396779,0.0033487447,0.00015355597,0.060351025],"study_design_scores_gemma":[0.00044145028,0.000027683544,0.0032135437,0.00020698676,0.000006801151,0.00004910167,0.0020517216,0.9877397,0.0017714147,0.0026779945,0.001641996,0.00017161382],"about_ca_topic_score_codex":0.00022643605,"about_ca_topic_score_gemma":0.0000394968,"teacher_disagreement_score":0.1384077,"about_ca_system_score_codex":0.0001250245,"about_ca_system_score_gemma":0.00008131274,"threshold_uncertainty_score":0.6539867},"labels":[],"label_agreement":null},{"id":"W2320184521","doi":"10.22260/isarc2011/0051","title":"Multi-Agent-Based Approach for Real-Time Collision Avoidance and Path Re-Planning on Construction Sites","year":2011,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Recherche Robert-Sauvé en Santé et en Sécurité du Travail","keywords":"Collision avoidance; Computer science; Negotiation; Motion planning; Collision; Path (computing); Download; Multi-agent system; Operations research; Control (management); Work (physics); Distributed computing; Computer security; Artificial intelligence; Engineering; Computer network; World Wide Web; Robot","score_opus":0.02949921104512663,"score_gpt":0.22026230240551437,"score_spread":0.19076309136038774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320184521","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98097247,0.00006363175,0.0073882383,0.000022415534,0.00018631942,0.00044556306,0.000020446707,0.00017178836,0.010729121],"genre_scores_gemma":[0.91586107,0.000013320879,0.08390692,0.000014475659,0.000040892493,0.000048238722,0.0000041439735,0.000019612053,0.00009134766],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999427,0.000003419606,0.00017797503,0.00015908429,0.000107676264,0.00012479522],"domain_scores_gemma":[0.99966365,0.000024330157,0.0000947539,0.00006461521,0.00012048805,0.000032147895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013287817,0.00012130638,0.00012961072,0.0000664715,0.00010976934,0.000024401814,0.00010256005,0.00008162599,0.000008377239],"category_scores_gemma":[0.000043093292,0.00009355552,0.000049979262,0.00011721502,0.00008857385,0.00012908074,0.000013698508,0.000096397926,0.0000015728498],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036122446,0.00011963432,0.028835952,0.000891675,0.00008038967,1.5306372e-7,0.003715509,0.002178868,0.94251996,0.009643663,0.0034689612,0.008184005],"study_design_scores_gemma":[0.001296865,0.000190093,0.006976788,0.00033160322,0.00006981821,0.000015445485,0.0025267538,0.41896415,0.56798244,0.0009874053,0.00031103854,0.0003476096],"about_ca_topic_score_codex":0.000006806128,"about_ca_topic_score_gemma":2.566115e-7,"teacher_disagreement_score":0.41678527,"about_ca_system_score_codex":0.000030785133,"about_ca_system_score_gemma":0.0000074912045,"threshold_uncertainty_score":0.38150835},"labels":[],"label_agreement":null},{"id":"W2320721741","doi":"10.3130/aija.77.775","title":"METHODS OF ESTIMATING EXTERIOR LIFE CYCLE REPAIR COST AND OPTIMIZING THE ANNUAL RENEWAL INVESTMENT FOR A GROUP OF FACILITIES","year":2012,"lang":"en","type":"article","venue":"Journal of Architecture and Planning (Transactions of AIJ)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"","keywords":"Investment (military); Order (exchange); Operations management; Reliability engineering; Appropriation; Flexibility (engineering); Engineering; Business; Mathematics; Finance; Statistics","score_opus":0.015790620829954347,"score_gpt":0.27343381077760903,"score_spread":0.25764318994765467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320721741","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27033982,0.0021959331,0.72693205,0.00004237739,0.0002578164,0.00009015022,0.000048113576,0.000011166318,0.000082566185],"genre_scores_gemma":[0.6224844,0.000033373177,0.37738234,0.000010996714,0.00007252924,0.000004177556,7.645982e-7,0.0000060809352,0.0000053757517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930185,0.000051052044,0.00041071055,0.00004485393,0.00009064343,0.00010089977],"domain_scores_gemma":[0.9992832,0.00031008234,0.00019336805,0.00006524971,0.00008614423,0.000061980965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045293535,0.00008899192,0.0002260615,0.00013358443,0.000071283386,0.000008627286,0.000046677465,0.0000528416,0.0000065306085],"category_scores_gemma":[0.00005549535,0.00006262019,0.00009787016,0.0000696497,0.000097225195,0.00015658978,0.000003476747,0.00017353329,1.0415603e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045846612,0.00007818731,0.0013852789,0.0013477781,0.0007977127,8.006502e-7,0.07155258,0.6371667,0.0427377,0.0005525209,0.0001616293,0.24376066],"study_design_scores_gemma":[0.010299839,0.006795565,0.025986318,0.0072681806,0.0034635314,0.004930074,0.23480867,0.44874814,0.2173387,0.013907279,0.024360651,0.0020930583],"about_ca_topic_score_codex":0.00001815334,"about_ca_topic_score_gemma":0.0000031807601,"teacher_disagreement_score":0.35214457,"about_ca_system_score_codex":0.000008442065,"about_ca_system_score_gemma":0.000018856426,"threshold_uncertainty_score":0.2553577},"labels":[],"label_agreement":null},{"id":"W2321010814","doi":"10.1139/cjce-2013-0103","title":"Modeling the impact of work-zone traffic flows upon concrete construction: a high level architecture based simulation framework","year":2013,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Stantec (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Computer science; Work (physics); Domain (mathematical analysis); Traffic flow (computer networking); Architecture; Resource (disambiguation); Traffic congestion; Transport engineering; Construction engineering; Civil engineering; Engineering; Computer network","score_opus":0.010078878819094516,"score_gpt":0.19296333697321963,"score_spread":0.1828844581541251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321010814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4897158,0.00035753474,0.50921434,0.000057523102,0.00050481566,0.00007901837,0.000009630623,0.000023474237,0.0000378599],"genre_scores_gemma":[0.99294686,0.000004679599,0.006714433,0.000008589032,0.00028250445,0.0000049648784,0.0000030657168,0.000032103377,0.0000028173588],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990742,0.00002027293,0.0004358938,0.00007540761,0.0001466304,0.00024759545],"domain_scores_gemma":[0.9991702,0.00011059029,0.00008262535,0.00015350297,0.00022433816,0.0002587434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012701757,0.00018105212,0.00023802693,0.00034751996,0.00006326048,0.000073278534,0.00015073846,0.00014691803,0.00043290705],"category_scores_gemma":[0.00008300712,0.00014132046,0.0001802487,0.00036000845,0.000030922973,0.00019400567,0.0000024220128,0.0005409966,0.0000028517502],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005094768,4.983755e-7,0.00007724593,0.000018206887,0.00007421612,0.0000023169189,0.00023869248,0.99277264,0.00038448672,0.00014064115,0.000049595455,0.0062363916],"study_design_scores_gemma":[0.00021158531,0.00003344727,0.000583655,0.00026871727,0.000024968469,0.000064327185,0.00006950346,0.9982798,0.00009128038,0.00015703464,0.00007545119,0.00014023461],"about_ca_topic_score_codex":0.00072614505,"about_ca_topic_score_gemma":0.0031528103,"teacher_disagreement_score":0.50323105,"about_ca_system_score_codex":0.00019836049,"about_ca_system_score_gemma":0.0002647685,"threshold_uncertainty_score":0.5762881},"labels":[],"label_agreement":null},{"id":"W2322013815","doi":"10.3722/cadaps.2012.795-810","title":"Conceptual Design of Hemp Fibre Production Lines in Virtual Environments","year":2012,"lang":"en","type":"article","venue":"Computer-Aided Design and Applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; McGill University","funders":"University of Minnesota","keywords":"Conceptual design; Production (economics); Computer science; Human–computer interaction","score_opus":0.022673958385139963,"score_gpt":0.2145165645416944,"score_spread":0.19184260615655443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322013815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017266199,0.0004050998,0.9815821,0.000029344315,0.00015671035,0.00044626178,0.0000025446896,0.000065060245,0.000046669986],"genre_scores_gemma":[0.9585824,0.00012635878,0.040655438,0.000020579297,0.00029341437,0.0002266078,0.000011685171,0.000013273908,0.00007026351],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942356,0.000041595715,0.00021602024,0.00012570588,0.00006864223,0.00012446343],"domain_scores_gemma":[0.99968344,0.00007826457,0.00003777649,0.00013614078,0.000013625152,0.00005072635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001146249,0.00010092537,0.00011322996,0.00007577243,0.000042790023,0.000010601109,0.00005888329,0.00006393519,0.000012456653],"category_scores_gemma":[0.0000045787083,0.000102835,0.00001727009,0.00014385591,0.00008890912,0.00017591541,0.0000131782235,0.00007702128,0.000015391777],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032575856,0.00027305458,0.0016894105,0.00004672858,0.00006155342,2.939673e-7,0.0015955579,0.38178933,0.13865271,0.058756545,0.0040138057,0.41308844],"study_design_scores_gemma":[0.0019499902,0.00042279484,0.015260811,0.00018180993,0.0001026733,0.000100312325,0.0010851442,0.6140947,0.28035632,0.004759986,0.08039918,0.0012863068],"about_ca_topic_score_codex":0.0000015312876,"about_ca_topic_score_gemma":2.4450924e-7,"teacher_disagreement_score":0.9413162,"about_ca_system_score_codex":0.00002414719,"about_ca_system_score_gemma":0.000008453073,"threshold_uncertainty_score":0.41934898},"labels":[],"label_agreement":null},{"id":"W2322082723","doi":"10.1139/cjce-2014-0019","title":"Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Documentation; Computer science; Visualization; 3D printing; Computer Aided Design; CAD; Rework; Information model; Identification (biology); Engineering drawing; Human–computer interaction; Software engineering; Engineering; Artificial intelligence; Mechanical engineering","score_opus":0.00470539608065611,"score_gpt":0.16914281480783974,"score_spread":0.16443741872718362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322082723","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2578389,0.00005668381,0.7411042,0.000007925259,0.0006308365,0.00008364981,0.000007235775,0.00002654109,0.00024405686],"genre_scores_gemma":[0.9960691,0.000018641504,0.0037664513,0.000010804672,0.000101713165,0.000004370154,0.0000092949085,0.000017646958,0.000002026634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993297,0.000004192799,0.000363679,0.00004519086,0.00009839093,0.0001588625],"domain_scores_gemma":[0.9995308,0.000027748627,0.000082525235,0.00005625676,0.00013598222,0.00016668231],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013732183,0.00011644113,0.00016275515,0.00039578215,0.000033139575,0.000044093453,0.00006963392,0.00006333939,0.000012666299],"category_scores_gemma":[0.00003950843,0.00012856534,0.000038041,0.00010646351,0.000014131751,0.00064579485,0.0000038168764,0.000104610415,5.6329793e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057596367,0.000001093432,0.0002525364,0.00019134553,0.000033319302,2.3650965e-7,0.00047963488,0.9859812,0.0006883897,0.001993155,0.000033136268,0.010340171],"study_design_scores_gemma":[0.00036439736,0.00009535664,0.00068185455,0.00019616522,0.000017841014,0.00006244335,0.00003152928,0.99440247,0.00085769186,0.000017216074,0.0031536557,0.00011938578],"about_ca_topic_score_codex":0.0001244409,"about_ca_topic_score_gemma":0.0013542072,"teacher_disagreement_score":0.73823017,"about_ca_system_score_codex":0.000111096255,"about_ca_system_score_gemma":0.000069616,"threshold_uncertainty_score":0.52427423},"labels":[],"label_agreement":null},{"id":"W2322368403","doi":"10.1061/40794(179)78","title":"A Hybrid Neural Network for Predicting Construction Labour Productivity","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Artificial neural network; Productivity; Computer science; Artificial intelligence; Machine learning; Fuzzy logic; Computational intelligence; Neuro-fuzzy; Construction industry; Genetic algorithm; Fuzzy control system; Engineering; Economics","score_opus":0.007080383583689841,"score_gpt":0.19785762190178346,"score_spread":0.19077723831809362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322368403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86805266,0.00011308546,0.124405496,0.00036357404,0.0017249038,0.00027786486,0.00001478687,0.0008171095,0.0042305007],"genre_scores_gemma":[0.97158813,0.0000046101286,0.025952348,0.000037586506,0.0019681922,0.000051952655,0.000008902248,0.0000146102875,0.0003736748],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994953,0.000008317011,0.000144561,0.00012316142,0.000059054524,0.00016957574],"domain_scores_gemma":[0.9997807,0.000019818783,0.000021401942,0.00009185927,0.00005369401,0.000032506206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008342257,0.00008654342,0.00008017427,0.000028122955,0.00008961815,0.000032615604,0.00003604333,0.00003319797,0.00008316766],"category_scores_gemma":[0.000017194296,0.000082973325,0.00003918429,0.00007212997,0.000024825611,0.0002575239,0.000004881916,0.00008989635,0.0000088778625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020860578,0.000010438743,0.0073430985,0.000046121317,0.00003953763,2.0770047e-7,0.000053810672,0.19781949,0.0017505501,0.04129732,0.008706854,0.7429117],"study_design_scores_gemma":[0.00045393003,0.000037804715,0.002908703,0.000014602618,0.000021633636,0.00016970882,0.00008444936,0.892464,0.019307947,0.0033645462,0.08091769,0.0002550257],"about_ca_topic_score_codex":0.0000065044737,"about_ca_topic_score_gemma":0.00004200271,"teacher_disagreement_score":0.7426567,"about_ca_system_score_codex":0.000037319303,"about_ca_system_score_gemma":0.000008542711,"threshold_uncertainty_score":0.33835542},"labels":[],"label_agreement":null},{"id":"W2322800104","doi":"10.1061/40937(261)29","title":"Hybrid System Dynamics and Discrete Event Simulation for Construction Management","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Computer science; Context (archaeology); Event (particle physics); Representation (politics); Context model; Construction management; Construction industry; Simulation modeling; Realm; Systems engineering; Industrial engineering; Construction engineering; Simulation; Engineering; Civil engineering; Artificial intelligence; Mathematics","score_opus":0.004086516114753595,"score_gpt":0.2120911575931887,"score_spread":0.2080046414784351,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322800104","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0476293,0.00002179936,0.9400504,0.000010131932,0.00053896534,0.00027225725,0.0000068608274,0.0002251722,0.011245074],"genre_scores_gemma":[0.9882871,0.0000055505716,0.0114225345,0.000004566936,0.00004847179,0.000015423371,0.000022481638,0.000008793371,0.00018508549],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996214,0.0000025785523,0.00015554947,0.00007922601,0.00005385719,0.00008737993],"domain_scores_gemma":[0.9998532,0.000020303469,0.00001790811,0.000056455938,0.000025242598,0.000026883776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000090888476,0.00006331279,0.000053225336,0.00006139315,0.00004728622,0.000021628546,0.00001644051,0.000025841784,0.000006905057],"category_scores_gemma":[0.0000013807962,0.00005963115,0.000018820512,0.00003406193,0.00001458913,0.00008182045,0.0000043778514,0.000025718988,0.0000023785499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002203031,0.0000018153586,0.00019815192,0.0002046869,0.000034580626,7.137893e-7,0.00001669074,0.051605064,0.00009280211,0.49482498,0.000044827404,0.45295367],"study_design_scores_gemma":[0.00033190896,0.000012306081,0.0005691513,0.00001852375,0.00001970761,0.000019953215,0.0006660972,0.9953536,0.0013573733,0.00065066834,0.00091866805,0.00008206879],"about_ca_topic_score_codex":0.0000024332219,"about_ca_topic_score_gemma":0.000015960177,"teacher_disagreement_score":0.94374853,"about_ca_system_score_codex":0.00010965475,"about_ca_system_score_gemma":0.0000011752594,"threshold_uncertainty_score":0.24316877},"labels":[],"label_agreement":null},{"id":"W2323174041","doi":"10.1061/40704(2003)18","title":"A Tale of Two SITIES","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Royal Academy of Engineering; York University","keywords":"Acronym; Information and Communications Technology; Architecture; Computer science; Business; Geography; World Wide Web","score_opus":0.005898392242679815,"score_gpt":0.19391154470638816,"score_spread":0.18801315246370834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323174041","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32607672,0.00008574384,0.032338094,0.0000044018952,0.00020192405,0.000015412312,7.019087e-7,0.00008347516,0.6411935],"genre_scores_gemma":[0.9974478,0.0000030744754,0.0014872816,0.00000537609,0.000006065795,0.0000012895829,2.541438e-7,0.0000018128172,0.001047044],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99990726,0.0000019032502,0.00003667214,0.000013754954,0.000017933857,0.000022480323],"domain_scores_gemma":[0.9999543,0.0000028993963,0.000002481474,0.000026697457,0.000008242909,0.000005405254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000009595285,0.000016280184,0.000021209311,0.000012785986,0.000004280341,0.000002212558,0.000007707734,0.000008018422,0.0005441805],"category_scores_gemma":[0.0000015423627,0.000014153847,0.0000072229222,0.000025637879,0.000007774096,0.000025863026,4.2953755e-7,0.0000125632705,0.0000128004],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.8774337e-7,0.0000031642128,0.0008624445,0.000012602159,0.000009835995,1.3297834e-7,0.00012382396,0.0016713555,0.024309881,0.96242136,0.0017857217,0.008799301],"study_design_scores_gemma":[0.00038633027,0.000024798834,0.0005423223,0.000011648026,0.000008502916,0.000026291162,0.0011523444,0.0109808305,0.9266228,0.017764766,0.0423209,0.00015843679],"about_ca_topic_score_codex":0.0000055787796,"about_ca_topic_score_gemma":0.000010595198,"teacher_disagreement_score":0.9446566,"about_ca_system_score_codex":0.0000030224958,"about_ca_system_score_gemma":0.000002211582,"threshold_uncertainty_score":0.5958395},"labels":[],"label_agreement":null},{"id":"W2323581470","doi":"10.1061/41052(346)51","title":"Developing a Bidding Game Using High Level Architecture","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Bidding; Computer science; Architecture; Construction bidding; Process (computing); High-level architecture; Real-time bidding; Simulation; Operations research; Process management; Software engineering; Systems engineering; Engineering; Project management; Operating system; Business; Marketing","score_opus":0.03398810860710106,"score_gpt":0.23771920005261485,"score_spread":0.2037310914455138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323581470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26158032,0.00003986076,0.7337804,0.00014444363,0.00024066775,0.00003300096,0.000001113551,0.00028117053,0.003899031],"genre_scores_gemma":[0.9169085,0.0000044598078,0.082744665,0.00013506888,0.00009725051,9.3661896e-7,0.0000019959061,0.0000073140354,0.00009980741],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999638,0.0000043641367,0.000103345075,0.0000739691,0.00006111478,0.0001191696],"domain_scores_gemma":[0.99988073,0.0000064376677,0.000009290558,0.000063523345,0.000016068594,0.000023972456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000023339795,0.00007889384,0.00006681983,0.00008218307,0.000034625904,0.000032073483,0.000041765557,0.00004979738,0.000083833555],"category_scores_gemma":[0.0000044887074,0.00007018858,0.000022332888,0.00014087651,0.0000072851117,0.00007520967,0.0000034583286,0.00009172032,0.00001231355],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039060174,0.000004028556,0.000121728845,0.000019618421,0.000024898281,0.0000032264024,0.0002996137,0.07509391,0.064578965,0.18276708,0.00019956524,0.67688346],"study_design_scores_gemma":[0.0013496523,0.00008971399,0.036772348,0.00044453636,0.00006148668,0.0006398873,0.000693514,0.5434998,0.2560153,0.13193889,0.026488543,0.0020062774],"about_ca_topic_score_codex":0.000014224057,"about_ca_topic_score_gemma":0.000012961209,"teacher_disagreement_score":0.67487717,"about_ca_system_score_codex":0.000060916514,"about_ca_system_score_gemma":0.000012308113,"threshold_uncertainty_score":0.28622073},"labels":[],"label_agreement":null},{"id":"W2323843643","doi":"10.1061/41020(339)50","title":"Virtual Supervision in Construction Projects","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia; University of Calgary","funders":"","keywords":"Popularity; Key (lock); Computer science; Focus (optics); Information flow; Construction industry; Construction management; Engineering management; Process management; Knowledge management; Engineering; Construction engineering; Computer security","score_opus":0.03109051985310798,"score_gpt":0.30286011757956055,"score_spread":0.2717695977264526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323843643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94671667,0.00086748094,0.0031670877,0.00067661976,0.00403879,0.00091159757,0.000026975456,0.0008176684,0.042777132],"genre_scores_gemma":[0.9967606,0.00048191167,0.0020278639,0.0000354479,0.00026719857,0.00004872543,0.00002361199,0.000023779,0.00033083282],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975941,0.00021179473,0.00050329964,0.0004062824,0.00067404675,0.00061043847],"domain_scores_gemma":[0.9989025,0.00009214996,0.00004225328,0.00035291482,0.00044406747,0.00016610669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062770344,0.00023703357,0.00026410376,0.001134933,0.00021793008,0.0001859546,0.00022467982,0.00028571003,0.0004025297],"category_scores_gemma":[0.0001477884,0.00024471502,0.000071452865,0.0013606256,0.0004735659,0.00067704887,0.000024348592,0.00090795895,0.00014060158],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007686515,0.000042305855,0.0045889057,0.000022360071,0.000016709448,0.000022566788,0.00019843032,0.0010014776,0.008315414,0.074024506,0.0038903165,0.90780014],"study_design_scores_gemma":[0.018366275,0.0037184744,0.12472302,0.0025595569,0.000095904055,0.005509958,0.03638037,0.24942334,0.20636216,0.1617306,0.18525872,0.005871618],"about_ca_topic_score_codex":0.00002599899,"about_ca_topic_score_gemma":0.000056100704,"teacher_disagreement_score":0.90192854,"about_ca_system_score_codex":0.0002691671,"about_ca_system_score_gemma":0.0001381064,"threshold_uncertainty_score":0.9979189},"labels":[],"label_agreement":null},{"id":"W2324253937","doi":"10.1061/9780784413517.175","title":"Crew Cost and Productivity Performance Benchmarking Based on Commercial Cost Estimating Databases","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Drainage Services Department; National Science Council","keywords":"Benchmarking; Crew; Productivity; Computer science; Production (economics); Database; Operations research; Business; Engineering; Aeronautics; Marketing","score_opus":0.04578847942345049,"score_gpt":0.31607486575645144,"score_spread":0.27028638633300095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2324253937","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81282103,0.00016059449,0.15498602,0.0005836939,0.0075613842,0.0016379294,0.00009935593,0.0006928101,0.02145719],"genre_scores_gemma":[0.98917526,0.00004508705,0.009747396,0.000032209926,0.00072337844,0.0001558031,0.000053279466,0.000029310855,0.000038295682],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99810356,0.00027487794,0.000275762,0.00039300547,0.0005189945,0.00043380624],"domain_scores_gemma":[0.9986376,0.00037624108,0.000060931416,0.00041120008,0.00034705945,0.00016696048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012949745,0.0002040305,0.00021951791,0.0003596852,0.00058989547,0.00018857679,0.00014420343,0.00009152687,0.00024324722],"category_scores_gemma":[0.00042500554,0.0002028089,0.000032532105,0.0002904897,0.00070081314,0.00043642274,0.000052705407,0.00065908587,0.000053070897],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005072738,0.000017065566,0.031272747,0.00016384147,0.000013711191,9.1756596e-7,0.000026545862,0.0077509913,0.00044913712,0.0040416974,0.003691343,0.95252126],"study_design_scores_gemma":[0.00063434325,0.00009292371,0.016590258,0.00026388242,0.000010492361,0.000046837056,0.000058507398,0.9433723,0.0039339503,0.000105946514,0.03461985,0.00027072625],"about_ca_topic_score_codex":0.000044478144,"about_ca_topic_score_gemma":0.00007360972,"teacher_disagreement_score":0.95225054,"about_ca_system_score_codex":0.000110872985,"about_ca_system_score_gemma":0.000068647794,"threshold_uncertainty_score":0.82703066},"labels":[],"label_agreement":null},{"id":"W2324386762","doi":"10.1061/41020(339)100","title":"Stakeholder Views on IT in Construction: A North American Perspective","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Resistance (ecology); Business; Productivity; Stakeholder; Work (physics); Construction industry; Unavailability; Knowledge management; Perspective (graphical); Information technology; Information and Communications Technology; Key (lock); Public relations; Engineering; Computer science; Construction engineering; Political science","score_opus":0.07589979151414869,"score_gpt":0.3389094073999082,"score_spread":0.26300961588575955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2324386762","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79299515,0.0007373561,0.001488229,0.004740139,0.0030035789,0.0013478746,0.00009769011,0.000797066,0.1947929],"genre_scores_gemma":[0.99656457,0.0005399697,0.0017154415,0.00020784982,0.0003297727,0.00008331703,0.00001580136,0.00003085733,0.0005124093],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972956,0.00025661036,0.00055706344,0.00051572814,0.00071859354,0.00065639976],"domain_scores_gemma":[0.9984518,0.00012203217,0.00009200556,0.00044548183,0.0006759741,0.00021268157],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004279395,0.00029596122,0.00037324175,0.0010873151,0.00023743974,0.00017643227,0.00024535684,0.00012254874,0.00037802377],"category_scores_gemma":[0.00016843734,0.00030025616,0.00009059435,0.0020776854,0.0010259057,0.00037284102,0.00001769465,0.00116683,0.00018739387],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021158518,0.000112693895,0.014559803,0.000024044291,0.00006769059,0.000059570208,0.00071360206,0.0020443327,0.0004630626,0.13053778,0.018188799,0.83301705],"study_design_scores_gemma":[0.010221648,0.0038026348,0.37694475,0.0010829344,0.000097380376,0.00238178,0.085051216,0.024033535,0.012782771,0.05090606,0.42795953,0.0047357623],"about_ca_topic_score_codex":0.00008648208,"about_ca_topic_score_gemma":0.0010377537,"teacher_disagreement_score":0.8282813,"about_ca_system_score_codex":0.0006130771,"about_ca_system_score_gemma":0.00014555188,"threshold_uncertainty_score":0.999945},"labels":[],"label_agreement":null},{"id":"W2325466647","doi":"10.1061/40475(278)59","title":"Multi-Dimensional Utility Model for Selection of a Trenchless Construction Method","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Western University","funders":"","keywords":"Trenchless technology; Computer science; Process (computing); Preference; Rank (graph theory); Modular design; Analytic hierarchy process; Selection (genetic algorithm); Ranking (information retrieval); Industrial engineering; Data mining; Operations research; Engineering; Machine learning; Mathematics","score_opus":0.022826677023372648,"score_gpt":0.2646715942432622,"score_spread":0.24184491721988954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2325466647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10185839,0.000014843469,0.89588684,0.000010696462,0.00012650123,0.00012231998,0.000019218494,0.00015172869,0.0018094504],"genre_scores_gemma":[0.55896914,0.0000027423253,0.44041848,0.0000071278787,0.00001703508,0.000022502129,0.000008798206,0.00000588085,0.0005482818],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995493,0.000012550292,0.00018861462,0.000103719525,0.000063259286,0.000082516824],"domain_scores_gemma":[0.99979603,0.000022928629,0.00001740565,0.000060399943,0.00007852028,0.000024701696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008231952,0.00007415027,0.00010135927,0.000049767856,0.000039288225,0.0000058467344,0.000025138539,0.00007663984,0.0008174162],"category_scores_gemma":[0.000004486774,0.00006960034,0.000057880086,0.00009761602,0.000025897996,0.000101427846,0.0000014736769,0.000055409182,0.0000035012968],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066425055,0.00004053655,0.0002642523,0.0000508023,0.00004811604,2.6848554e-8,0.0001322364,0.2532668,0.03677212,0.005774363,0.0005381391,0.70304614],"study_design_scores_gemma":[0.00031866576,0.000010857403,0.00027506446,0.000004558455,0.0000130248245,0.000012589642,0.000028617098,0.9580778,0.0401285,0.00083536946,0.00022802012,0.00006692533],"about_ca_topic_score_codex":0.000020867545,"about_ca_topic_score_gemma":0.00005508125,"teacher_disagreement_score":0.704811,"about_ca_system_score_codex":0.000021864245,"about_ca_system_score_gemma":0.000018662904,"threshold_uncertainty_score":0.8950134},"labels":[],"label_agreement":null},{"id":"W2326381641","doi":"10.1061/40754(183)111","title":"Hierarchical Clustering for Interpretation of Spatial Configuration","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Cluster analysis; Outlier; Data mining; Field (mathematics); Set (abstract data type); Selection (genetic algorithm); Similarity (geometry); Silhouette; Reuse; Artificial intelligence; Machine learning; Engineering","score_opus":0.007229680297894978,"score_gpt":0.22254804318358382,"score_spread":0.21531836288568884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326381641","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020863326,0.000012405432,0.96696854,0.00008185152,0.00020976925,0.0000929288,0.0000027874453,0.00008202072,0.011686381],"genre_scores_gemma":[0.99026376,0.000002536636,0.00947006,0.00001913556,0.00011202757,0.000018199891,0.00001269065,0.0000053670788,0.00009619505],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972934,0.000003778997,0.00014095235,0.000042249947,0.000038223232,0.000045483088],"domain_scores_gemma":[0.9998815,0.000019399173,0.000013678287,0.00003814534,0.000034334866,0.00001292366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000029424471,0.000038154067,0.00005000237,0.000037908885,0.000012399741,0.000008336201,0.00002158261,0.00003379459,0.0000949071],"category_scores_gemma":[0.000008198874,0.000036086734,0.000026003372,0.0000214894,0.000011532541,0.0000965241,0.0000018721108,0.000030233246,0.0000055737496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026634656,0.0000045210413,0.00003567755,0.000027176184,0.000010260243,1.2330708e-8,0.00022220353,0.03398842,0.020140858,0.012040126,0.0001884918,0.93331563],"study_design_scores_gemma":[0.00016049789,0.000021105265,0.00027123396,0.000007856638,0.0000038889225,0.000001517156,0.000032851425,0.936195,0.060908653,0.00028425863,0.0020726363,0.000040478757],"about_ca_topic_score_codex":0.000006985791,"about_ca_topic_score_gemma":0.00009730245,"teacher_disagreement_score":0.96940047,"about_ca_system_score_codex":0.000016798109,"about_ca_system_score_gemma":0.000004606944,"threshold_uncertainty_score":0.14715745},"labels":[],"label_agreement":null},{"id":"W2326439135","doi":"10.1061/40652(2003)15","title":"Construction Schedule Visualization","year":2002,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Schedule; Visualization; Bar chart; Representation (politics); Drill; Data visualization; Artificial intelligence; Engineering","score_opus":0.01036873158125117,"score_gpt":0.19854771142778369,"score_spread":0.1881789798465325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326439135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111447975,0.00026649603,0.4538236,0.0000832372,0.0015454355,0.00008931098,0.0000016506472,0.0014676885,0.43127462],"genre_scores_gemma":[0.99631494,0.0000437703,0.0028694142,0.000026546815,0.00007058938,0.00000555066,0.0000033905608,0.0000074973136,0.0006582759],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997637,0.0000040627824,0.000079336445,0.000047638496,0.00004873042,0.000056490157],"domain_scores_gemma":[0.99989665,0.0000031639058,0.000006572369,0.000051828014,0.000022077493,0.000019713107],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000123160335,0.000043548138,0.000033634034,0.000045339148,0.000029199908,0.00002023134,0.000018570092,0.000039024522,0.0032533945],"category_scores_gemma":[0.0000032088506,0.000042143605,0.000014627687,0.00011091762,0.000017427732,0.00013522373,0.0000016298171,0.00003302074,0.00031822885],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.756833e-7,0.000013271794,0.001916519,0.000018442008,0.000021876453,4.3108804e-7,0.00012821429,0.002055652,0.008652883,0.65896213,0.014665782,0.31356385],"study_design_scores_gemma":[0.000274495,0.000016749558,0.0004347542,0.000009072549,0.000009077745,0.00006315682,0.00024240966,0.90213674,0.04141504,0.0018314106,0.05335923,0.00020787318],"about_ca_topic_score_codex":0.0000011252781,"about_ca_topic_score_gemma":0.000002918124,"teacher_disagreement_score":0.9000811,"about_ca_system_score_codex":0.00001702353,"about_ca_system_score_gemma":8.333653e-7,"threshold_uncertainty_score":0.9976578},"labels":[],"label_agreement":null},{"id":"W2326791358","doi":"10.1061/40475(278)42","title":"Reasoning about Construction Methods","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Computer science; Process (computing); Context (archaeology); Selection (genetic algorithm); Operations research; Management science; Systems engineering; Risk analysis (engineering); Artificial intelligence; Engineering","score_opus":0.006900866195357872,"score_gpt":0.25329925611797577,"score_spread":0.2463983899226179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326791358","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05627604,0.00021248408,0.25846517,0.000026559626,0.0005788088,0.00004184058,8.756156e-7,0.0007278604,0.68367034],"genre_scores_gemma":[0.37033683,0.00021908844,0.62367207,0.00007376412,0.00021106817,0.000018111876,0.000006126891,0.000022000437,0.005440948],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997022,0.000015634749,0.00009869924,0.00006396962,0.000039116396,0.000080390455],"domain_scores_gemma":[0.99986774,0.000010218134,0.000005346738,0.000075430995,0.000013897867,0.000027392325],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000057168505,0.00005639517,0.000054368935,0.000030365127,0.000038050814,0.000024442756,0.000027560354,0.000048163747,0.0077766986],"category_scores_gemma":[0.0000036540453,0.000052243213,0.000025075344,0.00009485635,0.00002433293,0.000110336034,0.0000012322164,0.000070633956,0.00016284642],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012491864,8.187159e-7,0.000121998244,0.0000025093411,0.00000729195,1.3973008e-7,0.000029534911,0.000869026,0.0011707582,0.023772929,0.00061314314,0.9734106],"study_design_scores_gemma":[0.0005154976,0.000027732334,0.004952489,0.00005112193,0.000034337565,0.00039066485,0.0005091738,0.26516205,0.081386216,0.009772195,0.6366423,0.0005562546],"about_ca_topic_score_codex":0.000010289722,"about_ca_topic_score_gemma":0.000004237808,"teacher_disagreement_score":0.9728544,"about_ca_system_score_codex":0.00001840797,"about_ca_system_score_gemma":0.000004199149,"threshold_uncertainty_score":0.9931303},"labels":[],"label_agreement":null},{"id":"W2327441640","doi":"10.1061/41020(339)95","title":"Mapping Actors and Roles in Construction Knowledge","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Process (computing); Knowledge management; Computer science; Product (mathematics); Root (linguistics); Data science","score_opus":0.027117524557713477,"score_gpt":0.30201813461459853,"score_spread":0.27490061005688504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2327441640","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93983436,0.0034116064,0.0017623582,0.0004176547,0.0018973941,0.00046313796,0.00001560187,0.00039714025,0.051800773],"genre_scores_gemma":[0.9970104,0.00090726704,0.0015658134,0.000013974671,0.00019148807,0.000027357639,0.0000075203598,0.000016981592,0.0002591714],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9983843,0.00015223133,0.00038462106,0.00032221872,0.0002969845,0.00045963997],"domain_scores_gemma":[0.99920976,0.000097550095,0.000039182178,0.00021559102,0.00028270966,0.00015520824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047199926,0.0001972621,0.00023117842,0.0010701761,0.00020088333,0.0001673154,0.00013013852,0.00021955406,0.00019330297],"category_scores_gemma":[0.000092874165,0.00020857008,0.000042363405,0.0009476919,0.0005330443,0.00046974284,0.000023918905,0.00068056583,0.00005331167],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023254457,0.00002137953,0.010154304,0.000037345708,0.000018867191,0.000007634837,0.00038910183,0.00012553374,0.0059085162,0.03556379,0.0013314438,0.9464188],"study_design_scores_gemma":[0.009951553,0.0007687394,0.3497838,0.0022767286,0.000053356198,0.0036257207,0.039283395,0.11338151,0.06637379,0.1761419,0.23448831,0.0038711915],"about_ca_topic_score_codex":0.000011293816,"about_ca_topic_score_gemma":0.00007532895,"teacher_disagreement_score":0.9425476,"about_ca_system_score_codex":0.00016900524,"about_ca_system_score_gemma":0.00007622879,"threshold_uncertainty_score":0.8505241},"labels":[],"label_agreement":null},{"id":"W2327525975","doi":"10.1061/41020(339)131","title":"Modeling Architecture for Hybrid System Dynamics and Discrete Event Simulation","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"High-level architecture; Computer science; Context (archaeology); Architecture; Hybrid system; Discrete event simulation; Systems engineering; Set (abstract data type); Systems architecture; Event (particle physics); Distributed computing; System dynamics; Software engineering; Industrial engineering; Simulation; Engineering; Artificial intelligence; Interoperability; Operating system","score_opus":0.018150031172450697,"score_gpt":0.3002952469232337,"score_spread":0.28214521575078305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2327525975","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.118916996,0.0005137446,0.8768487,0.00026728454,0.0008446012,0.0006516185,0.000091640526,0.00036777137,0.0014976389],"genre_scores_gemma":[0.99645084,0.000055179433,0.0030461305,0.000009114162,0.00020110767,0.000049152124,0.000049853075,0.000019980878,0.000118645024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869186,0.00007015821,0.0003072623,0.00026671257,0.00032072785,0.0003433032],"domain_scores_gemma":[0.9991411,0.0000953977,0.000030075735,0.00019903874,0.00040767848,0.00012669867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035612978,0.0001614896,0.00017834883,0.00032489083,0.000299241,0.00015846413,0.000098089746,0.00010879277,0.000012022457],"category_scores_gemma":[0.00007031557,0.00015801587,0.00006119177,0.0002033248,0.0001285544,0.00021682818,0.000013592875,0.00034599612,0.0000044147964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004711074,0.000003927571,0.000047215213,0.00008604877,0.000020101217,0.0000016521883,0.000032833275,0.6103334,0.00024460242,0.039371494,0.000110793306,0.34970084],"study_design_scores_gemma":[0.0004084971,0.0000639468,0.000048336115,0.00010793666,0.00001188756,0.00009475008,0.0004513778,0.99133086,0.00047352057,0.0062137577,0.00063407276,0.00016106469],"about_ca_topic_score_codex":0.000007663786,"about_ca_topic_score_gemma":0.000022017164,"teacher_disagreement_score":0.87753385,"about_ca_system_score_codex":0.00021393376,"about_ca_system_score_gemma":0.000037966623,"threshold_uncertainty_score":0.64437},"labels":[],"label_agreement":null},{"id":"W2328463100","doi":"10.1061/40937(261)57","title":"Sustainability, Whole Life Costs, and Information and Communication Technologies: A Review of Published Works","year":2007,"lang":"en","type":"review","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Sustainability; Information and Communications Technology; Process (computing); Process management; Work (physics); Computer science; Knowledge management; Business; Risk analysis (engineering); Management science; Engineering","score_opus":0.013092416625493597,"score_gpt":0.2744787536745247,"score_spread":0.2613863370490311,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328463100","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[5.579507e-7,0.99210113,0.002216317,0.00026952123,0.000047040245,0.00074128713,0.000008052748,0.00029402357,0.004322073],"genre_scores_gemma":[0.000030289886,0.9990521,0.0006107596,0.00003805098,0.000005652511,0.00008775652,0.00015142199,0.000009510097,0.000014474852],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99893165,0.00003629073,0.00073776755,0.00009346162,0.00009997511,0.00010088536],"domain_scores_gemma":[0.99898267,0.00010593991,0.00019302493,0.00042242827,0.00026154364,0.000034366596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049155636,0.00017958655,0.00062991574,0.00027618796,0.000033447912,0.00009625685,0.00015430625,0.0003650713,0.000021910868],"category_scores_gemma":[0.0005337716,0.00014215203,0.000054482014,0.00046154877,0.00012043361,0.0010816838,0.00008642006,0.00036076788,0.000002458522],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.0658998e-7,0.0000017994731,0.0000020436826,0.09735821,0.00001897738,2.1558364e-8,0.000007902753,1.9565422e-7,8.04129e-9,0.0060222493,0.0019293186,0.894659],"study_design_scores_gemma":[0.00004883493,0.000008372759,0.0000021577735,0.039140444,0.00007882259,0.000013228036,0.00032406356,0.000064482556,3.0700426e-7,0.00024055857,0.95995426,0.00012448661],"about_ca_topic_score_codex":0.000013617539,"about_ca_topic_score_gemma":0.000007729171,"teacher_disagreement_score":0.9580249,"about_ca_system_score_codex":0.0001409729,"about_ca_system_score_gemma":0.00008602382,"threshold_uncertainty_score":0.57967913},"labels":[],"label_agreement":null},{"id":"W2328576025","doi":"10.1142/9789812701480_0091","title":"INNOVATIVE DESIGN AND CONSTRUCTION TECHNOLOGIES FOR BUILDING INTERNAL PARTITIONS FOR SUPER HI-RISE BUILDINGS ON AN INTERNATIONAL BASIS","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Basis (linear algebra); Architectural engineering; Computer science; Construction engineering; Engineering; Mathematics; Geometry","score_opus":0.017404854726745335,"score_gpt":0.25650745394721464,"score_spread":0.2391025992204693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328576025","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19001424,0.000019671432,0.8075134,0.0006869409,0.00039657793,0.0003159476,0.000033977445,0.0004843724,0.00053483195],"genre_scores_gemma":[0.6233405,0.000026161282,0.37617126,0.0000403973,0.000111463654,0.0002446492,0.000011499881,0.00001304457,0.000041019815],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99940294,0.000007195843,0.00020509322,0.0001810177,0.00006852475,0.00013523294],"domain_scores_gemma":[0.99957484,0.000088594104,0.000031759664,0.00008282578,0.0001979831,0.000024013669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000112972746,0.00012228117,0.00009656551,0.00023615891,0.00011718966,0.00008500254,0.00008821362,0.00010006809,0.000046032947],"category_scores_gemma":[0.00007146196,0.000114655464,0.00003087166,0.00012841639,0.0000848429,0.0005517649,0.000010687524,0.00009527136,0.0000018961405],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008056199,0.000023152008,0.00053726666,0.000013128464,0.00007460952,1.0055401e-7,0.00013522191,0.00612493,0.01564139,0.33442914,0.0017235469,0.64121693],"study_design_scores_gemma":[0.0015716484,0.0003803771,0.00031320995,0.000087207445,0.000036922174,0.00006949093,0.0023008075,0.27583256,0.60957986,0.029429866,0.07991616,0.0004818747],"about_ca_topic_score_codex":0.0000037218738,"about_ca_topic_score_gemma":0.000008256075,"teacher_disagreement_score":0.6407351,"about_ca_system_score_codex":0.00008984581,"about_ca_system_score_gemma":0.000010841694,"threshold_uncertainty_score":0.4675514},"labels":[],"label_agreement":null},{"id":"W2328794983","doi":"10.1061/40937(261)32","title":"Automated Code Compliance Checking of Building Envelope Performance","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Building envelope; Computer science; Envelope (radar); XML; Code (set theory); Building code; Building design; Building model; Building information modeling; Scheme (mathematics); Building automation; Software engineering; Architectural engineering; Engineering; Set (abstract data type); Programming language; Simulation; World Wide Web; Compatibility (geochemistry)","score_opus":0.021908408640592777,"score_gpt":0.25384597680307297,"score_spread":0.23193756816248018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328794983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82048947,0.0000549221,0.1387472,0.000006491107,0.00028638617,0.000037279264,0.0000010172694,0.0007858238,0.0395914],"genre_scores_gemma":[0.983677,0.000013794548,0.016132122,0.000011216814,0.000024426203,0.0000012124202,0.000001323217,0.0000075975286,0.00013130196],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996042,0.0000017660433,0.00016783534,0.000053231503,0.00006592783,0.00010700763],"domain_scores_gemma":[0.99984074,0.000011447279,0.000020430256,0.00006767086,0.000039124683,0.000020588968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009577226,0.00005592116,0.000068893394,0.00005131107,0.000027202816,0.000006819922,0.000051754,0.000037204754,0.00007547001],"category_scores_gemma":[0.000003769802,0.00005317367,0.000015417194,0.00014375537,0.000020226136,0.00009657676,0.0000054178217,0.000058011716,0.000011334931],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024986377,0.0000230626,0.0492534,0.00044829195,0.00007884353,0.0000024595506,0.0005589698,0.042728968,0.52063185,0.032940846,0.0023323125,0.35097602],"study_design_scores_gemma":[0.00010719785,0.000007324365,0.036925655,0.00006328622,0.0000027076903,0.000011482108,0.0000620356,0.52495,0.4358916,0.000025427458,0.0018622763,0.00009098736],"about_ca_topic_score_codex":0.000004936481,"about_ca_topic_score_gemma":0.000014861165,"teacher_disagreement_score":0.48222107,"about_ca_system_score_codex":0.000026571557,"about_ca_system_score_gemma":0.0000049915207,"threshold_uncertainty_score":0.21683593},"labels":[],"label_agreement":null},{"id":"W2330380178","doi":"10.1108/f-06-2014-0050","title":"Automated building information modeling for fault detection and diagnostics in commercial HVAC systems","year":2016,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"HVAC; Facility management; Building information modeling; Process (computing); Engineering; Fault detection and isolation; Benchmarking; Systems engineering; Computer science; Air conditioning; Operations management; Artificial intelligence","score_opus":0.011301135295024621,"score_gpt":0.20781817193504412,"score_spread":0.1965170366400195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330380178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6561044,0.00010762884,0.3426189,0.000015704038,0.00048574948,0.00013392251,0.00007923055,0.0003304479,0.00012402213],"genre_scores_gemma":[0.9995999,0.000068573965,0.00017307747,0.0000033106485,0.00003657155,0.00008297629,0.0000062241215,0.0000040626182,0.000025332614],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963224,0.0000078597395,0.0001792611,0.00004186417,0.00004750649,0.0000912645],"domain_scores_gemma":[0.99981457,0.00006821045,0.000013842575,0.00004001888,0.00004752739,0.000015832815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006343832,0.00006239142,0.00007102631,0.00009500642,0.00004328483,0.00004361321,0.000019783276,0.00006399766,0.0000020946743],"category_scores_gemma":[0.00007142729,0.00005091276,0.000012127139,0.00003919057,0.000013197205,0.00045919913,0.0000044192875,0.000033244734,0.0000033719318],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069036876,0.000008803371,0.002501171,0.0009953353,0.000045710294,3.3691165e-7,0.0050279284,0.47375083,0.010038805,0.017704444,0.0007563703,0.48910123],"study_design_scores_gemma":[0.00027554008,0.000013423136,0.00024965842,0.00006528341,0.0000028077166,0.0000032566581,0.0009532391,0.9936732,0.0010514571,0.0003433684,0.0032894157,0.00007936815],"about_ca_topic_score_codex":0.00010898472,"about_ca_topic_score_gemma":0.000089793364,"teacher_disagreement_score":0.5199224,"about_ca_system_score_codex":0.000063066866,"about_ca_system_score_gemma":0.0000052234736,"threshold_uncertainty_score":0.20761621},"labels":[],"label_agreement":null},{"id":"W2332618398","doi":"10.1061/9780784412329.078","title":"Providing Query Support to Leverage BIM for Construction","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Building information modeling; Leverage (statistics); Ontology; Flexibility (engineering); Software engineering; Systems engineering; Database; Data mining; Engineering; Artificial intelligence","score_opus":0.06356479648402116,"score_gpt":0.33905957800296765,"score_spread":0.27549478151894646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2332618398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41400045,0.0022281827,0.47270265,0.001494909,0.047907274,0.0061958004,0.00034494384,0.0025856195,0.052540176],"genre_scores_gemma":[0.97543347,0.000079764664,0.020631734,0.000055194494,0.0015825866,0.00078580814,0.000047519552,0.00007858002,0.0013053581],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99751097,0.00013172785,0.00046537895,0.0003276735,0.0005505112,0.0010137098],"domain_scores_gemma":[0.9981359,0.00021986778,0.000061150924,0.00036968035,0.00071626494,0.0004970895],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0011344897,0.00025739096,0.00026964254,0.00074871624,0.00045706096,0.00018977872,0.00021320043,0.0002523119,0.00089298986],"category_scores_gemma":[0.0002342642,0.00026800894,0.00009888976,0.0006550032,0.00040075314,0.0014276734,0.000059485963,0.00048544462,0.00036948835],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013109283,0.000046996538,0.008962563,0.00033810182,0.00013276032,0.000001927419,0.00041735597,0.0002519045,0.030159721,0.19330877,0.048058476,0.7181903],"study_design_scores_gemma":[0.0011281312,0.00019272004,0.0013305917,0.00013142002,0.00004312754,0.00044746962,0.0023681214,0.0015982111,0.12839118,0.0034620925,0.860126,0.0007809151],"about_ca_topic_score_codex":0.000016967222,"about_ca_topic_score_gemma":0.000022098779,"teacher_disagreement_score":0.81206757,"about_ca_system_score_codex":0.00031053674,"about_ca_system_score_gemma":0.00013480733,"threshold_uncertainty_score":0.99997723},"labels":[],"label_agreement":null},{"id":"W2335275950","doi":"10.1061/40513(279)178","title":"Case-Based Reasoning System for Bridge Management","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministère des Transports","keywords":"Bridge (graph theory); Case-based reasoning; Computer science; Matching (statistics); Reliability (semiconductor); Similarity (geometry); Representation (politics); Adaptation (eye); Markov process; Data mining; Artificial intelligence; Machine learning; Image (mathematics)","score_opus":0.009529951091890657,"score_gpt":0.1966276123306065,"score_spread":0.18709766123871585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335275950","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1267677,0.00005706989,0.5069577,0.000027503633,0.00047299007,0.00034533502,0.000011300692,0.001170524,0.3641899],"genre_scores_gemma":[0.9904759,0.0000016631928,0.007909578,0.000018861587,0.000044621593,0.00006318755,0.0000056571007,0.000009435626,0.0014711211],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997523,0.0000028143932,0.00007791295,0.00005973427,0.00003204516,0.00007522939],"domain_scores_gemma":[0.99988794,0.000006357666,0.0000041559733,0.00007261535,0.0000098908295,0.000019062796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003069304,0.00004788162,0.000041509426,0.000025900352,0.00004023595,0.000021600335,0.000020819787,0.000022162454,0.00025917555],"category_scores_gemma":[3.3899755e-7,0.00004471303,0.00002714344,0.000044702796,0.000003905931,0.00003412213,7.8453695e-7,0.00001961913,0.000050640894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002131852,0.000008976075,0.00009567815,0.0005187705,0.00007510639,0.0001433043,0.000053058913,0.040360134,0.000109517896,0.11923495,0.014343572,0.82503563],"study_design_scores_gemma":[0.00079511787,0.000022322512,0.0002655399,0.00009237345,0.000042462943,0.001130904,0.00032447983,0.92225987,0.004800506,0.000048715912,0.069984466,0.00023322969],"about_ca_topic_score_codex":0.000015083171,"about_ca_topic_score_gemma":0.000010768793,"teacher_disagreement_score":0.8818998,"about_ca_system_score_codex":0.000039369217,"about_ca_system_score_gemma":0.0000017953558,"threshold_uncertainty_score":0.28377903},"labels":[],"label_agreement":null},{"id":"W2335770678","doi":"10.3166/jesa.47.339-360","title":"Outils d’aide à la décision pour le diagnostic des structures immergées","year":2013,"lang":"fr","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.01603326735907842,"score_gpt":0.23362450375112384,"score_spread":0.21759123639204542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335770678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7918004,0.055145353,0.11197636,0.0017156177,0.0065138955,0.00052259135,0.000044455675,0.00059473165,0.031686634],"genre_scores_gemma":[0.93052906,0.004090968,0.050821926,0.00006454668,0.0011985551,0.00003057679,0.0000061166047,0.0001491682,0.013109071],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9966833,0.00064184965,0.001120275,0.00031717427,0.000486326,0.00075109466],"domain_scores_gemma":[0.99757355,0.0008668197,0.00032498635,0.00032625027,0.00047457052,0.00043379716],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00043409076,0.0005501852,0.0005479361,0.00034978476,0.00070157286,0.0013449746,0.00041035723,0.00035294594,0.0027396698],"category_scores_gemma":[0.00096121355,0.00049546827,0.00033186446,0.0003997841,0.00047761906,0.0016336528,0.000080580925,0.0009165963,0.0013204531],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006352429,0.000057922498,0.0027486486,0.00043152086,0.00024467506,0.0001297171,0.0011445864,0.008529926,0.0056100856,0.017040793,0.023812545,0.94024324],"study_design_scores_gemma":[0.00085727265,0.00014652786,0.7046692,0.0020680851,0.00017625853,0.008934273,0.0016777589,0.0506569,0.0024677624,0.2163891,0.011264844,0.00069205795],"about_ca_topic_score_codex":0.002181332,"about_ca_topic_score_gemma":0.00013532571,"teacher_disagreement_score":0.9395512,"about_ca_system_score_codex":0.00043780552,"about_ca_system_score_gemma":0.0003107966,"threshold_uncertainty_score":0.9997497},"labels":[],"label_agreement":null},{"id":"W2335773252","doi":"10.1061/40671(2003)98","title":"Construction Methods Feasibility Reasoning in an Integrated Environment","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Pace; Reuse; Exploit; Modular design; Computer science; Process (computing); Schedule; Architecture; Product (mathematics); Systems engineering; Engineering management; Knowledge management; Engineering","score_opus":0.019172855103187333,"score_gpt":0.2738537474135827,"score_spread":0.25468089231039537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335773252","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40509915,0.00006888319,0.5739135,0.000006720675,0.00037993578,0.00011611731,0.000001222138,0.00021037292,0.020204056],"genre_scores_gemma":[0.6855071,0.000014817273,0.31438264,0.000008588139,0.000008979326,0.000013120562,0.00000559405,0.000008467242,0.000050643444],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993533,0.00014218818,0.00018780258,0.00014539763,0.000055919172,0.00011539184],"domain_scores_gemma":[0.99975854,0.000016291699,0.000014218297,0.00015180047,0.000013158244,0.00004598155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028710562,0.00009383883,0.00009508857,0.000072422685,0.000026139076,0.000023051733,0.00003371022,0.000079650636,0.000876405],"category_scores_gemma":[0.000027894916,0.000086821376,0.0000222964,0.00013316913,0.00004069153,0.00019475482,0.0000025236095,0.00014721614,0.000015854408],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016969349,0.000068484114,0.109526604,0.000019594396,0.000023011527,0.0000019558101,0.00038304922,0.018098075,0.029750377,0.1759646,0.00007556309,0.6660717],"study_design_scores_gemma":[0.0028729998,0.00025452737,0.08960649,0.000096709,0.000054764267,0.00033195602,0.013591915,0.44610155,0.3522376,0.030948447,0.062150363,0.0017526594],"about_ca_topic_score_codex":0.000022428256,"about_ca_topic_score_gemma":0.00006042446,"teacher_disagreement_score":0.66431904,"about_ca_system_score_codex":0.00016211266,"about_ca_system_score_gemma":0.000012184931,"threshold_uncertainty_score":0.959602},"labels":[],"label_agreement":null},{"id":"W2335854605","doi":"","title":"OTTAWA DECISION SUPPORT TUTORIAL FOR ENHANCING UNDERSTANDING OF SHARED DECISION MAKING: WHAT DO THE USERS THINK?","year":2015,"lang":"en","type":"article","venue":"37th Annual Meeting of the Society for Medical Decision Making","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Decision support system; R-CAST; Computer science; Business decision mapping; Decision analysis; Decision aids; Knowledge management; Management science; Data science; Artificial intelligence; Engineering; Medicine; Mathematics","score_opus":0.025929664096791916,"score_gpt":0.29610330021762626,"score_spread":0.27017363612083434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335854605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.069713175,0.0010702073,0.9160123,0.00030368156,0.011495065,0.0009097746,0.00008584103,0.00014386687,0.0002660717],"genre_scores_gemma":[0.91854167,0.00009801759,0.08027307,0.00019568263,0.0007642866,0.00003891408,0.000008483696,0.00006380525,0.000016095828],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99588454,0.00006581114,0.001316187,0.00038149295,0.001877297,0.00047466956],"domain_scores_gemma":[0.9926908,0.0055708266,0.00047667415,0.00051333,0.00057982915,0.00016854856],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.004822237,0.00030337207,0.000496946,0.0000940792,0.00047575007,0.00019406088,0.0009107493,0.00046652477,0.000058716138],"category_scores_gemma":[0.008376084,0.00019328717,0.0011170406,0.00049698463,0.00024458472,0.00057415466,0.00023120007,0.00042951625,0.0000021432065],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014969454,0.00009156199,0.00049921934,0.00043276313,0.0004967174,0.0000019399772,0.023250535,0.024567302,0.0009788867,0.0145096015,0.15141313,0.7822614],"study_design_scores_gemma":[0.009695632,0.0008600176,0.0003529509,0.027092794,0.0007130759,0.00010608816,0.17551957,0.3578771,0.004156583,0.36848578,0.053669218,0.0014712],"about_ca_topic_score_codex":0.000005398849,"about_ca_topic_score_gemma":0.00005523952,"teacher_disagreement_score":0.8488285,"about_ca_system_score_codex":0.00036566018,"about_ca_system_score_gemma":0.0002664019,"threshold_uncertainty_score":0.9999768},"labels":[],"label_agreement":null},{"id":"W2337285428","doi":"","title":"Adoption of a Management System Approach to Geometric Design Process for Better and Safer Roads","year":2015,"lang":"en","type":"article","venue":"TAC 2015: Getting You There Safely - 2015 Conference and Exhibition of the Transportation Association of Canada // ATC: Destination sÃ©curitÃ© routiÃ¨re - 2015 CongrÃ¨s et Exposition de l'Association des transports du Canada","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"SAFER; Geometric design; Transport engineering; Process (computing); Asset (computer security); Engineering; Construction engineering; Systems engineering; Computer science; Risk analysis (engineering); Computer security; Business","score_opus":0.013138104471593987,"score_gpt":0.2127801697716791,"score_spread":0.1996420653000851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2337285428","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7583465,0.0005304508,0.23064655,0.003314065,0.00091023056,0.0025611476,0.0017144097,0.00018039272,0.0017962691],"genre_scores_gemma":[0.99481034,0.00008135032,0.0036448264,0.00018795599,0.00006948168,0.00021353725,0.00054066995,0.000050628812,0.0004012259],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99613965,0.00027960548,0.0013439202,0.0004074828,0.0013619043,0.00046745813],"domain_scores_gemma":[0.9954147,0.0002589097,0.0013662203,0.00022891862,0.002451739,0.0002795177],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0019303147,0.00039496607,0.0005975777,0.00032876973,0.00024098498,0.00007177691,0.0002109297,0.00029293128,0.00003164408],"category_scores_gemma":[0.0001907358,0.00040693049,0.0001128696,0.0007144769,0.000066116845,0.0006232771,0.000008116521,0.00023684112,4.020001e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016427261,0.00071423384,0.3974556,0.010325797,0.0026953956,0.000020790487,0.026159506,0.38284728,0.0049579223,0.051737297,0.097771175,0.02367225],"study_design_scores_gemma":[0.011116463,0.00061447907,0.87260765,0.0025770562,0.0018920487,0.000045217672,0.019733956,0.05286449,0.022241512,0.004622553,0.009011258,0.0026732965],"about_ca_topic_score_codex":0.059012376,"about_ca_topic_score_gemma":0.28888673,"teacher_disagreement_score":0.47515205,"about_ca_system_score_codex":0.0022335274,"about_ca_system_score_gemma":0.0014304061,"threshold_uncertainty_score":0.99983823},"labels":[],"label_agreement":null},{"id":"W2339012944","doi":"10.60164/b1e4b3f8i","title":"Generic Implementation of Lean Concepts in Simulation Models","year":2004,"lang":"en","type":"article","venue":"Lean Construction Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Standards Association","funders":"","keywords":"Lean manufacturing; Lean project management; Lean construction; Process (computing); Production (economics); Computer science; Lean laboratory; Manufacturing engineering; Lean software development; Product (mathematics); Industrial engineering; Process management; Systems engineering; Engineering; Construction industry; Construction engineering; Software","score_opus":0.0176654575413583,"score_gpt":0.2755998956761529,"score_spread":0.2579344381347946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2339012944","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76127905,0.000098404416,0.23684262,0.000032866537,0.00092901156,0.00007397744,0.0000038021085,0.0000501298,0.00069013797],"genre_scores_gemma":[0.9947778,0.00006827259,0.004957112,0.000015334252,0.00015462507,0.000003020167,0.0000056936383,0.000013320145,0.0000048252577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912024,0.000014718042,0.00047152702,0.00008783629,0.00016795183,0.00013774744],"domain_scores_gemma":[0.9996363,0.0000115434095,0.00012402383,0.00007204827,0.00010455495,0.00005153405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000109671775,0.000102836864,0.00012978201,0.00025671456,0.00006017708,0.000026916727,0.000054844506,0.00006894824,0.00021076041],"category_scores_gemma":[0.000004658844,0.00010903357,0.000057465622,0.0002514273,0.00006516554,0.00049376313,0.000004461561,0.00021945189,0.000004534598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000062087715,0.0000045495535,0.0019358603,0.000008240583,0.000014024725,0.0000017562712,0.00039894265,0.8519764,0.002446147,0.015898323,0.00001160515,0.12729794],"study_design_scores_gemma":[0.011462861,0.00033099094,0.017167857,0.00032480792,0.00010581104,0.0034967007,0.027262533,0.55123675,0.08932446,0.29699042,0.0011627141,0.0011340807],"about_ca_topic_score_codex":0.000028162485,"about_ca_topic_score_gemma":0.00008096566,"teacher_disagreement_score":0.30073965,"about_ca_system_score_codex":0.0001814064,"about_ca_system_score_gemma":0.000066565124,"threshold_uncertainty_score":0.444626},"labels":[],"label_agreement":null},{"id":"W2340495110","doi":"","title":"Development of the Detectable Warning Surface Tiles Standard Specification for the City of Winnipeg","year":2015,"lang":"en","type":"article","venue":"TAC 2015: Getting You There Safely - 2015 Conference and Exhibition of the Transportation Association of Canada // ATC: Destination sÃ©curitÃ© routiÃ¨re - 2015 CongrÃ¨s et Exposition de l'Association des transports du Canada","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rationalization (economics); SAFER; Engineering; National standard; Architectural engineering; Computer security; Computer science; Political science","score_opus":0.013456146656362128,"score_gpt":0.21413614644970558,"score_spread":0.20067999979334344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340495110","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9650962,0.00055677525,0.025989937,0.0042175907,0.00092919194,0.0011178171,0.0014648818,0.000070180395,0.0005574369],"genre_scores_gemma":[0.9971718,0.00010439968,0.001662419,0.000092041555,0.000059568414,0.00006055806,0.0002892948,0.00003927795,0.0005206228],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9959151,0.0002812921,0.001567021,0.00029483635,0.0015370098,0.0004047204],"domain_scores_gemma":[0.99352753,0.0005280952,0.002378103,0.00030376905,0.0031164319,0.00014606805],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0022830744,0.0003411965,0.00052789476,0.00009660388,0.0004336429,0.00005450824,0.00032775532,0.00025722012,0.00011104185],"category_scores_gemma":[0.00042664915,0.0002861086,0.00015860147,0.00049492164,0.00013025517,0.0005097189,0.000010790259,0.00031458098,2.175621e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096755166,0.00031308216,0.6644866,0.002089448,0.0017131924,0.0000035173828,0.03853824,0.16817814,0.03964198,0.020597681,0.049426004,0.014044548],"study_design_scores_gemma":[0.004426183,0.00015714136,0.79070854,0.0011607548,0.0007318698,0.000008793673,0.010261669,0.012110005,0.14986639,0.0027704095,0.026723549,0.0010747212],"about_ca_topic_score_codex":0.09641164,"about_ca_topic_score_gemma":0.79513335,"teacher_disagreement_score":0.6987217,"about_ca_system_score_codex":0.0021076335,"about_ca_system_score_gemma":0.004060773,"threshold_uncertainty_score":0.9999591},"labels":[],"label_agreement":null},{"id":"W2341522343","doi":"10.14288/1.0062461","title":"Enhancing the performance and productivity of the New Brunswick construction industry through appropriate digital technology adoption : final report","year":2014,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Business; Industry 4.0; Industrial organization; Marketing; Engineering management; Operations management; Computer science; Engineering; Economics; Economic growth","score_opus":0.0049680621440849415,"score_gpt":0.1507651603075884,"score_spread":0.14579709816350347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341522343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9909231,0.000035955294,0.007677687,0.00013705621,0.00024898283,0.000120808196,0.000004077186,0.00006268429,0.0007896422],"genre_scores_gemma":[0.9991565,0.000021284666,0.0005069446,0.000002351484,0.000040057308,2.3224744e-7,0.0000018780363,0.000004981979,0.00026578706],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99954253,0.000013619983,0.00011185886,0.00014173209,0.000103339546,0.00008692473],"domain_scores_gemma":[0.99958885,0.000009647013,0.00010914507,0.00019228645,0.000082508006,0.000017571103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093233735,0.000032591386,0.00010790069,0.000019483172,0.00015039218,0.000034800294,0.00010613618,0.00014888882,0.0000073069637],"category_scores_gemma":[0.000029416758,0.000064733584,0.000032457712,0.00023981978,0.00037957611,0.00039317668,0.0000436536,0.0002518494,7.714843e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032875198,0.000009521409,0.08591511,0.00006684099,0.000020940248,0.0000012129816,0.00013443643,0.00016227417,0.001433396,0.00007054941,0.00013770619,0.9120447],"study_design_scores_gemma":[0.0002581754,0.000028141581,0.99471337,0.000118651915,0.000020757214,0.00076208066,0.0011915818,0.00084830826,0.00041271426,0.00095306546,0.00060435076,0.00008878308],"about_ca_topic_score_codex":0.003964403,"about_ca_topic_score_gemma":0.017331334,"teacher_disagreement_score":0.91195595,"about_ca_system_score_codex":0.000026698626,"about_ca_system_score_gemma":0.000076430006,"threshold_uncertainty_score":0.9671292},"labels":[],"label_agreement":null},{"id":"W2344774270","doi":"10.14288/1.0098891","title":"Adopting computers in architectural firms","year":2008,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Business; Software engineering; Programming language","score_opus":0.006487521682712006,"score_gpt":0.1434317194288764,"score_spread":0.1369441977461644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2344774270","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963099,0.000049753435,0.0024283184,0.00001314341,0.00017367145,0.000051409374,0.000010586198,0.000101830185,0.00086140604],"genre_scores_gemma":[0.9965824,0.000030007572,0.003299038,0.0000072272665,0.000016422095,1.296395e-7,0.0000050718527,0.0000055058345,0.000054203403],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9996475,0.000008586256,0.000066009256,0.000098151,0.00007292436,0.00010683488],"domain_scores_gemma":[0.99984145,0.00001385262,0.000018530136,0.00006735156,0.000025312607,0.000033520897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025813562,0.000021479225,0.000097334574,0.00003979236,0.00006095545,0.000014518448,0.00008811475,0.00004599246,0.00003271872],"category_scores_gemma":[0.0000035739984,0.00008448114,0.000042420434,0.00015960763,0.000076997436,0.00012500683,0.000016314534,0.00010428479,0.0000072567664],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021286482,0.000013351921,0.030645473,0.000034525117,0.0000132744735,0.00010653365,0.00036865447,0.0027454589,0.0001662953,0.0000034876807,0.0010918276,0.964809],"study_design_scores_gemma":[0.00033915276,0.000011404773,0.9897002,0.00006484582,0.0000025877323,0.00024721463,0.00027380485,0.008970305,9.2159814e-7,0.000027109605,0.00027359015,0.00008888691],"about_ca_topic_score_codex":0.01802462,"about_ca_topic_score_gemma":0.08525855,"teacher_disagreement_score":0.96472013,"about_ca_system_score_codex":0.000039832204,"about_ca_system_score_gemma":0.000011875394,"threshold_uncertainty_score":0.9885144},"labels":[],"label_agreement":null},{"id":"W2346222113","doi":"10.7492/ijaec.2016.003","title":"Modeling Infrastructure Bridges Maintenance Work Zones","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Construction engineering; Bridge (graph theory); Computer science; Geology; Business; Engineering; Mechanical engineering","score_opus":0.002788475860728361,"score_gpt":0.17281133658599027,"score_spread":0.1700228607252619,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2346222113","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44590157,0.0002834226,0.55093044,0.0003654012,0.0023649235,0.000021180229,0.000005264676,0.00006463882,0.00006316295],"genre_scores_gemma":[0.9820528,0.00028889131,0.016952017,0.000015098486,0.00065534073,0.0000018932749,9.316544e-7,0.00001727442,0.000015767984],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992517,0.000009119728,0.00031264886,0.000091419155,0.00021305039,0.000122052654],"domain_scores_gemma":[0.9995743,0.000036831647,0.00006275248,0.000062752224,0.00019629611,0.00006707469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000074266485,0.00014041773,0.00013860823,0.000267774,0.000024159168,0.000048062033,0.00013249427,0.00007556594,0.00002325421],"category_scores_gemma":[0.00005146801,0.00009701072,0.00006970834,0.00008392659,0.00004878671,0.00020514484,0.0000147552555,0.00020785184,0.000001449183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051939063,0.0000029733199,0.0010992726,0.000012373108,0.00011917177,0.000009514061,0.00012531652,0.42039108,0.006945154,0.004725372,0.0000921454,0.5664257],"study_design_scores_gemma":[0.009792081,0.0004924119,0.034245636,0.0053012054,0.00032875364,0.043639716,0.0013526932,0.74181867,0.029736554,0.053306215,0.07687531,0.003110764],"about_ca_topic_score_codex":0.0000015627302,"about_ca_topic_score_gemma":0.0000011496444,"teacher_disagreement_score":0.5633149,"about_ca_system_score_codex":0.00007479178,"about_ca_system_score_gemma":0.000017003471,"threshold_uncertainty_score":0.39559823},"labels":[],"label_agreement":null},{"id":"W2351475691","doi":"","title":"Probe into the Problems Existing in Current Intellectualized Construction of Residential Quarter and the Countermeasures","year":2008,"lang":"en","type":"article","venue":"Sci-Tech Information Development & Economy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Current (fluid); Engineering; Architectural engineering; Risk analysis (engineering); Electrical engineering; Business; Geography","score_opus":0.014862588401724146,"score_gpt":0.20398595965566038,"score_spread":0.18912337125393625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2351475691","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8527268,0.00093532796,0.11529566,0.00057716307,0.0014653361,0.001967321,0.0000029922605,0.00024628293,0.02678307],"genre_scores_gemma":[0.99773324,0.00015660166,0.0018336745,0.000029115492,0.00002546553,0.00019341848,0.000012708003,0.000004855199,0.000010903387],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989603,0.0000341589,0.0006911984,0.00007317792,0.000121359786,0.00011975998],"domain_scores_gemma":[0.99955726,0.000050915067,0.00015516717,0.0001038784,0.000112368696,0.000020411459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049201114,0.00011560392,0.00014295435,0.00018836575,0.00021480053,0.0000756238,0.00011008245,0.000048218346,0.000041757154],"category_scores_gemma":[0.000041603013,0.0000776396,0.000026208185,0.00018452233,0.00028922583,0.0008050462,0.000024799834,0.0001692316,0.000016794043],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019802492,0.000023951248,0.0145009905,0.00062802486,0.0001428825,3.0430508e-7,0.18777287,0.0025300446,0.00011993629,0.04145387,0.0022635406,0.75036556],"study_design_scores_gemma":[0.015559831,0.00010672459,0.05344302,0.0013798049,0.00006942845,0.0005729838,0.031569034,0.13917972,0.029648697,0.043256868,0.6833269,0.0018870041],"about_ca_topic_score_codex":0.000026980872,"about_ca_topic_score_gemma":0.00009011801,"teacher_disagreement_score":0.74847853,"about_ca_system_score_codex":0.0000985691,"about_ca_system_score_gemma":0.00011150553,"threshold_uncertainty_score":0.3166051},"labels":[],"label_agreement":null},{"id":"W23564366","doi":"10.22260/isarc2013/0037","title":"Conflict Impact Assessment between Objects in a BIM System","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Seriousness; Computer science; Building information modeling; Conflict analysis; Operations research; Engineering; Operations management; Conflict resolution; Sociology; Political science","score_opus":0.009546662019823189,"score_gpt":0.23058896385580382,"score_spread":0.22104230183598064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W23564366","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96745,0.00004670085,0.000052007057,0.00006759518,0.00016133818,0.00026830594,0.0000035120197,0.00010515692,0.031845387],"genre_scores_gemma":[0.99955505,0.000004877863,0.0002490719,0.000005838462,0.00007076395,0.000047509347,6.491143e-7,0.000013824289,0.00005240739],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993889,0.0000030653437,0.0002198863,0.00008836179,0.0001486782,0.00015113509],"domain_scores_gemma":[0.99971974,0.000019132678,0.00006125454,0.00006228845,0.00010080141,0.00003676632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010867966,0.00010459769,0.00015804544,0.000090472284,0.000027263251,0.00004909283,0.00017010083,0.000065222535,0.000036335452],"category_scores_gemma":[0.000013434122,0.000070589915,0.00006784134,0.00022909361,0.000029317476,0.00021541714,0.00002635798,0.00015799826,0.000016815995],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007818973,0.0000267178,0.82290345,0.0010383953,0.00020590937,2.3129469e-7,0.0032880835,0.0004278444,0.117480755,0.03436283,0.0049242186,0.015333743],"study_design_scores_gemma":[0.00090257195,0.00010381344,0.8852167,0.0007739069,0.000060372084,0.000032521613,0.009265375,0.028268337,0.07188884,0.0024043582,0.0006376893,0.00044551678],"about_ca_topic_score_codex":0.00018231012,"about_ca_topic_score_gemma":0.0000029625232,"teacher_disagreement_score":0.062313244,"about_ca_system_score_codex":0.00016302856,"about_ca_system_score_gemma":0.000016783588,"threshold_uncertainty_score":0.28785732},"labels":[],"label_agreement":null},{"id":"W2369018680","doi":"","title":"Taking Huatai residential quarter in Handan as example to discuss energy-efficiency design of residential buildings","year":2007,"lang":"en","type":"article","venue":"Shanxi Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Energy consumption; Architectural engineering; Compatibility (geochemistry); Efficient energy use; Engineering; Environmental science; Civil engineering; Geography","score_opus":0.009214995333350733,"score_gpt":0.22941619825519577,"score_spread":0.22020120292184503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2369018680","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2838018,0.00009270535,0.713949,0.00007583137,0.00042475192,0.00015074055,0.0000051818647,0.00009844148,0.0014015214],"genre_scores_gemma":[0.993836,0.000004667225,0.005734312,0.000044452856,0.00023938196,0.000017108585,0.000007904267,0.000029592999,0.00008656719],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99860877,0.000049207523,0.0004070117,0.0002692655,0.00029810306,0.00036764346],"domain_scores_gemma":[0.9994966,0.000067677305,0.000068886206,0.00023174574,0.000040665334,0.000094434035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033726892,0.00018912146,0.00019637913,0.0005289292,0.000072831506,0.00005130232,0.00021911765,0.00012956267,0.00019407462],"category_scores_gemma":[0.00004895093,0.0001706491,0.00006968047,0.00049381366,0.000052435436,0.00010093764,0.00003624289,0.00024069627,0.000010102377],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044293658,0.0000646877,0.00096717005,0.00010306416,0.000059642232,0.00008270912,0.011362614,0.2278974,0.5587748,0.009757499,0.0016144129,0.18887304],"study_design_scores_gemma":[0.0023673768,0.00069012435,0.027544903,0.0007274023,0.000081647115,0.0003314968,0.0023258117,0.011293863,0.91478395,0.02934021,0.00890433,0.0016088934],"about_ca_topic_score_codex":0.0011343583,"about_ca_topic_score_gemma":0.0029167302,"teacher_disagreement_score":0.7100342,"about_ca_system_score_codex":0.00005991787,"about_ca_system_score_gemma":0.000035547546,"threshold_uncertainty_score":0.6958868},"labels":[],"label_agreement":null},{"id":"W2376967410","doi":"","title":"Design Idea of a Intelligent Residential Quarter","year":2002,"lang":"en","type":"article","venue":"Jiangsu Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architectural engineering; Engineering; Civil engineering; Geography; Archaeology","score_opus":0.01555799708740064,"score_gpt":0.19764651726436266,"score_spread":0.18208852017696203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376967410","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11025553,0.00060539256,0.86716527,0.00014768717,0.0032210029,0.0002909038,0.000007648999,0.00046855654,0.017838039],"genre_scores_gemma":[0.99092054,0.000084723804,0.008690538,0.000010379752,0.00013744047,0.000015423811,0.000002648429,0.000013490374,0.00012478432],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993319,0.000028611954,0.00028251484,0.00010951223,0.0001300259,0.0001174181],"domain_scores_gemma":[0.9996891,0.000019330468,0.00005199982,0.0001375521,0.000065053486,0.000036968064],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000058666836,0.00010112561,0.000118480784,0.00015535176,0.00003744889,0.000024008414,0.000057556816,0.00009222985,0.0011569074],"category_scores_gemma":[0.000009405687,0.00010377355,0.000058812682,0.00018918687,0.00008280923,0.0001797363,0.0000049114087,0.00010356377,0.000118075164],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046492954,0.000045820572,0.0016541256,0.00012335768,0.00019217464,0.0000060593316,0.0016225718,0.0075367605,0.06225043,0.027923599,0.028304173,0.87029445],"study_design_scores_gemma":[0.0017599987,0.0003613618,0.0029265091,0.00023984973,0.00022340126,0.0010944933,0.0031712952,0.37509865,0.5772358,0.015907418,0.020764804,0.0012163953],"about_ca_topic_score_codex":0.0000115648245,"about_ca_topic_score_gemma":0.000006161365,"teacher_disagreement_score":0.88066506,"about_ca_system_score_codex":0.00004254651,"about_ca_system_score_gemma":0.0000055995793,"threshold_uncertainty_score":0.99975616},"labels":[],"label_agreement":null},{"id":"W2380825133","doi":"","title":"Research on Intelligent Residential Quarter Facility Management","year":2005,"lang":"en","type":"article","venue":"Journal of Jilin Architectural and Civil Engineering Institute","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facility management; Quarter (Canadian coin); Building automation; Process (computing); Engineering management; Architectural engineering; Building management; Management system; Point (geometry); Engineering; Operations management; Business; Computer science; Marketing; Geography","score_opus":0.018551809593358986,"score_gpt":0.2551523108305689,"score_spread":0.2366005012372099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2380825133","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9519312,0.0005997509,0.042975772,0.00035919764,0.0013287914,0.00010934158,0.00000621135,0.000082120176,0.00260764],"genre_scores_gemma":[0.9978499,0.0001559629,0.0014811128,0.000015044628,0.00040397665,0.0000043093305,0.0000014731168,0.0000075831554,0.00008068416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990116,0.00001984322,0.0003500925,0.0001028491,0.00031198736,0.0002036672],"domain_scores_gemma":[0.9996565,0.000032366836,0.000029984927,0.00010791941,0.00006902509,0.00010421156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032855372,0.00013036894,0.00014647361,0.00036939347,0.00006523849,0.000055560376,0.00012160433,0.00005162675,0.000041529835],"category_scores_gemma":[0.000013150736,0.000103537575,0.000073335104,0.00016349758,0.00005739726,0.00017778558,0.000021348733,0.00055088743,0.000017171742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005708875,0.000018912719,0.000030090008,0.00010569619,0.00008984802,0.00002202956,0.00027823457,0.80232525,0.001769365,0.0033706087,0.0009941919,0.19093868],"study_design_scores_gemma":[0.003444743,0.0012568915,0.032227747,0.0016780964,0.00015777163,0.0022513247,0.0011087874,0.3332236,0.032973606,0.0026212814,0.5874672,0.0015889386],"about_ca_topic_score_codex":0.000003280345,"about_ca_topic_score_gemma":0.000073887844,"teacher_disagreement_score":0.586473,"about_ca_system_score_codex":0.00008661121,"about_ca_system_score_gemma":0.000010774475,"threshold_uncertainty_score":0.42221397},"labels":[],"label_agreement":null},{"id":"W2381975180","doi":"","title":"Combined Thermal Storage Construction of Concrete Used in A9 Housing Project of Beijing Fulicheng Residential Quarter","year":2004,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Beijing; Quarter (Canadian coin); Plan (archaeology); Civil engineering; Architectural engineering; Engineering; Transport engineering; China; Geography","score_opus":0.008746843033676906,"score_gpt":0.2111575432327838,"score_spread":0.2024107001991069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2381975180","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98439854,0.000027369651,0.013161224,0.000019120456,0.000334087,0.00016072948,0.0000032130108,0.00009353092,0.0018021843],"genre_scores_gemma":[0.99658066,0.0000045246834,0.0033521857,0.0000036820632,0.000030920535,0.0000060604334,0.000004340761,0.00001247869,0.000005152062],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992802,0.000027136733,0.00035800907,0.00009569088,0.00012499753,0.000113928676],"domain_scores_gemma":[0.9997396,0.000018662744,0.0000701052,0.00010482848,0.000051141746,0.00001569244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009770707,0.0000962748,0.00018137817,0.00015354023,0.0000201384,0.000012967726,0.000049448212,0.000087258006,0.000045065455],"category_scores_gemma":[0.000008387789,0.00009520148,0.00004895592,0.00021108185,0.00007663471,0.00020436807,0.0000068916693,0.00011753593,0.0000014124826],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014021776,0.000014722913,0.026464282,0.00021886193,0.000095023555,0.0000048683814,0.0030167187,0.021343239,0.9218645,0.021593865,0.000033604803,0.0052100634],"study_design_scores_gemma":[0.0060463073,0.00026624114,0.02598142,0.00039951992,0.00006543449,0.000028155346,0.0076463236,0.025959754,0.9321691,0.0009006636,0.00003169834,0.00050541834],"about_ca_topic_score_codex":0.0003947185,"about_ca_topic_score_gemma":0.00017775064,"teacher_disagreement_score":0.020693202,"about_ca_system_score_codex":0.000060065206,"about_ca_system_score_gemma":0.000047338584,"threshold_uncertainty_score":0.3882204},"labels":[],"label_agreement":null},{"id":"W2385982178","doi":"","title":"Study on the Problems in and Countermeasures for the Protection of Earthen Building in Fujian Province","year":2013,"lang":"en","type":"article","venue":"Sci-Tech Information Development & Economy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Popularity; Tourism; Reputation; Business; Environmental planning; Geography; Engineering; Civil engineering; Political science; Archaeology; Law","score_opus":0.01766171698253818,"score_gpt":0.19116201071893615,"score_spread":0.17350029373639797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2385982178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9830957,0.000015171368,0.010975563,0.00028733737,0.00009906516,0.0035124014,0.0000010630813,0.000037976693,0.0019757154],"genre_scores_gemma":[0.9979214,0.000003074737,0.0002544817,0.00003263461,0.00000728464,0.0017653907,0.000001493413,0.0000037856523,0.000010467964],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99940306,0.0000117737445,0.00036730454,0.000056223565,0.00006494079,0.000096717966],"domain_scores_gemma":[0.99974257,0.000035791603,0.000075733034,0.000082333325,0.000052703013,0.000010855399],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046228847,0.00007800096,0.000074541356,0.00015481315,0.00007934075,0.00009114025,0.0000807149,0.0000331276,0.000013754823],"category_scores_gemma":[0.000018226874,0.000050839386,0.000009850725,0.000110283225,0.000023937751,0.0007339524,0.00001141097,0.00009799492,0.00000945839],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031608648,0.000075307755,0.062588476,0.00033844452,0.00009017197,7.633826e-8,0.031843636,0.024099903,0.00042363897,0.007458054,0.0003205671,0.87273014],"study_design_scores_gemma":[0.0025316777,0.0002474493,0.76613176,0.00042633517,0.000008290186,0.000009755692,0.029090814,0.13126755,0.014998963,0.0046180533,0.050080292,0.0005890944],"about_ca_topic_score_codex":0.000038791633,"about_ca_topic_score_gemma":0.00022073385,"teacher_disagreement_score":0.872141,"about_ca_system_score_codex":0.00008990614,"about_ca_system_score_gemma":0.00004983193,"threshold_uncertainty_score":0.20731701},"labels":[],"label_agreement":null},{"id":"W2387807980","doi":"","title":"Mensuration of Thermal Conductivity Coefficient and Linear Thermal Expansion Coefficient of Shale CeramicsGrain Concrete Products","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Thermal conductivity; Thermal expansion; Oil shale; Materials science; Roof; Ceramic; Thermal; Composite material; Mineralogy; Structural engineering; Geology; Thermodynamics; Engineering; Waste management; Physics","score_opus":0.011335647690349669,"score_gpt":0.21271711780021285,"score_spread":0.20138147010986318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2387807980","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98994386,0.00016692103,0.007252556,0.00008660401,0.0001809254,0.00021427276,0.000015803664,0.000075750555,0.00206329],"genre_scores_gemma":[0.9981091,0.000013572719,0.0016793193,0.000012312144,0.0000673619,0.000005851129,0.0000123367745,0.000012054254,0.00008806918],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99927825,0.000032867203,0.00027918178,0.00014436072,0.00015349631,0.000111868074],"domain_scores_gemma":[0.9995709,0.000026571463,0.00006614712,0.0001473381,0.00015826072,0.000030803993],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016723164,0.00011094963,0.00016062768,0.000064191736,0.000034080473,0.000008397373,0.00004423819,0.00006879377,0.00007422069],"category_scores_gemma":[0.00001934124,0.00009332132,0.000024389015,0.00012865376,0.000117801246,0.00012546903,0.000014095968,0.000082923296,0.0000029007713],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020715592,0.000015461976,0.00019698884,0.000052134157,0.000016092252,1.3467549e-7,0.0006414368,0.044756383,0.93498796,0.0023211748,0.000048565602,0.016942969],"study_design_scores_gemma":[0.00028753717,0.00006568174,0.0013897684,0.00001618319,0.00001289447,0.000005510863,0.0002187145,0.31246212,0.6852206,0.0000041509043,0.00022516269,0.00009170371],"about_ca_topic_score_codex":0.00002157971,"about_ca_topic_score_gemma":0.00000691621,"teacher_disagreement_score":0.26770574,"about_ca_system_score_codex":0.000024546674,"about_ca_system_score_gemma":0.000022947677,"threshold_uncertainty_score":0.3805533},"labels":[],"label_agreement":null},{"id":"W2392852446","doi":"","title":"Research on Energy-saving Retrofit Method of Existed Buildings Based on Actual Conditions","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Payback period; Energy (signal processing); Energy consumption; Architectural engineering; Foundation (evidence); Process (computing); Engineering; Consumption (sociology); Civil engineering; Computer science; Production (economics); Economics; Mathematics","score_opus":0.04044882490353085,"score_gpt":0.34215741989326265,"score_spread":0.3017085949897318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2392852446","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10097648,0.000017874321,0.43865106,0.0006908833,0.00035808774,0.0001390637,0.000025999077,0.00051639206,0.45862415],"genre_scores_gemma":[0.9875249,0.0000032690475,0.011633336,0.00016632308,0.000054516797,0.000008674987,0.000015748567,0.000010069762,0.00058312685],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99921316,0.00006286222,0.00016955091,0.0001296131,0.00026736586,0.00015744321],"domain_scores_gemma":[0.9994118,0.00022664267,0.000018203365,0.00018131403,0.000114458984,0.000047567784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025475502,0.000085531974,0.000107053085,0.00034435873,0.00007486071,0.000021773816,0.00008148563,0.000093276765,0.00054769014],"category_scores_gemma":[0.000043420616,0.000077328514,0.00004927236,0.00038136594,0.00002986469,0.00006482363,0.0000034340933,0.00021443758,0.0000151335635],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004433942,0.000049547056,0.000028017204,0.000011658036,0.00001738514,0.0000016970766,0.000060349386,0.021548353,0.13606216,0.7638305,0.009580099,0.06876589],"study_design_scores_gemma":[0.00075762725,0.00076724676,0.004262892,0.00018480171,0.00001579613,0.00000873027,0.00057541946,0.23465592,0.7401473,0.009136305,0.009174826,0.00031315407],"about_ca_topic_score_codex":0.000033049622,"about_ca_topic_score_gemma":0.000010487601,"teacher_disagreement_score":0.88654846,"about_ca_system_score_codex":0.00007967764,"about_ca_system_score_gemma":0.000019224315,"threshold_uncertainty_score":0.5996823},"labels":[],"label_agreement":null},{"id":"W2394706375","doi":"10.1016/j.proeng.2016.04.056","title":"Achieving Sustainable Structural Steel Design by Estimating Fabrication Labor Cost Based on BIM Data","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Cost estimate; Estimation; Engineering; Activity-based costing; Production (economics); Matching (statistics); Set (abstract data type); Operations research; Manufacturing engineering; Computer science; Business; Economics; Marketing; Systems engineering","score_opus":0.012469442899851187,"score_gpt":0.21569187876420826,"score_spread":0.20322243586435706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2394706375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011482583,0.00016510455,0.98643124,0.00011547081,0.000518162,0.00032883318,0.000052052823,0.00075557444,0.00015096387],"genre_scores_gemma":[0.9470386,0.000009600864,0.052376233,0.000026005775,0.0002487331,0.000103118866,0.00006523667,0.000060781476,0.00007170395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989623,0.000011612668,0.00023033912,0.00026950432,0.00017871507,0.00034754735],"domain_scores_gemma":[0.99924123,0.00016617482,0.000041678446,0.00036532586,0.0001011945,0.00008437354],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017710315,0.00020995752,0.00013622906,0.00014123428,0.00008284979,0.00008424193,0.00026839983,0.00008363111,0.00003806089],"category_scores_gemma":[0.00043395648,0.0001715515,0.000020132387,0.00027381702,0.000014732199,0.0006114128,0.000032968615,0.00014528466,0.00001773431],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002416255,0.000013179018,0.0014917698,0.00049440574,0.000044098295,0.0000036781757,0.00010226698,0.79609513,0.07450807,0.004729253,0.0045731305,0.11792083],"study_design_scores_gemma":[0.00029560283,0.000020275998,0.0005936328,0.00011647037,0.000012502817,0.0000042493084,0.000033295462,0.9870754,0.009044802,0.000047534446,0.0025085139,0.0002477406],"about_ca_topic_score_codex":0.0000040352206,"about_ca_topic_score_gemma":4.4311048e-7,"teacher_disagreement_score":0.935556,"about_ca_system_score_codex":0.00018145188,"about_ca_system_score_gemma":0.000038401286,"threshold_uncertainty_score":0.6995667},"labels":[],"label_agreement":null},{"id":"W2397323803","doi":"10.1177/0037549715608373","title":"Special issue on simulation related to design","year":2015,"lang":"en","type":"article","venue":"SIMULATION","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Computer science; Management science; Engineering","score_opus":0.030647872019218682,"score_gpt":0.2699014064517079,"score_spread":0.23925353443248923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2397323803","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.092058584,0.000023185421,0.76695144,0.00021283011,0.0073540327,0.00082517485,0.0000057900265,0.0010905369,0.13147844],"genre_scores_gemma":[0.99605495,4.761262e-7,0.0009808887,0.000050931787,0.00225916,0.000006938444,0.000015950009,0.000018937506,0.0006117669],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940807,0.00003112407,0.00017894464,0.000112297224,0.00016905802,0.000100486686],"domain_scores_gemma":[0.999621,0.000070187794,0.00002038046,0.000113092356,0.0000956647,0.000079708116],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00011550648,0.000093551054,0.0000741833,0.00012391481,0.000036567824,0.000031615058,0.00003755483,0.000094806644,0.00025358767],"category_scores_gemma":[0.00008205754,0.000096855736,0.000021696673,0.00023282411,0.0000068934683,0.00016573115,0.000003916047,0.00007980832,0.0011369888],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032886368,0.000004791782,0.00004585461,0.0000015782032,0.000005042691,3.4841128e-7,0.00039374916,0.9098878,0.00006990739,0.00064084976,0.0035600876,0.08535712],"study_design_scores_gemma":[0.00026789098,0.00006667018,0.00044625756,0.000009576017,0.0000052942432,4.3431706e-7,0.000045773653,0.913693,0.00068224076,0.0017229278,0.08295117,0.0001087654],"about_ca_topic_score_codex":0.0000020644413,"about_ca_topic_score_gemma":0.0000020250732,"teacher_disagreement_score":0.90399635,"about_ca_system_score_codex":0.00012730712,"about_ca_system_score_gemma":0.000012202793,"threshold_uncertainty_score":0.99964076},"labels":[],"label_agreement":null},{"id":"W2397726616","doi":"10.1061/9780784479827.004","title":"Design Change Time Ripple Effect Analysis Using a BIM-Based Quantification Model","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Scope (computer science); Computer science; Ripple; Risk analysis (engineering); Plan (archaeology); Work (physics); Project management; Frame (networking); Operations research; Systems engineering; Business; Engineering","score_opus":0.10438790563905705,"score_gpt":0.3354859888109263,"score_spread":0.23109808317186925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2397726616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07950415,0.00022476242,0.91795814,0.0001700336,0.00061122526,0.00066102855,0.000061000774,0.0004028017,0.00040688465],"genre_scores_gemma":[0.98717976,0.00008991992,0.011757523,0.0000102795475,0.00018064398,0.00032114514,0.00002292778,0.000046833113,0.0003909691],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978062,0.00043982224,0.00034232342,0.000393573,0.00055580464,0.00046227273],"domain_scores_gemma":[0.99827737,0.00041368112,0.00007609621,0.00048930856,0.0005832759,0.00016029562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011508855,0.00021440074,0.0002931288,0.0012707004,0.00027366582,0.00012692278,0.00021079314,0.00020559727,0.0006769183],"category_scores_gemma":[0.00013316661,0.00015621468,0.0001419387,0.0012974957,0.00047047395,0.00051472784,0.000024672681,0.00021536562,0.0003506973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002961722,0.000041102332,0.0039811493,0.00011396506,0.000795152,0.0000064843766,0.000087564214,0.057586238,0.4688865,0.006258836,0.0028770277,0.45906982],"study_design_scores_gemma":[0.0006110458,0.000046203077,0.00013557416,0.000101598984,0.00011666535,0.000010082931,0.0000160689,0.93124187,0.0662898,0.0007087001,0.0004968888,0.00022551321],"about_ca_topic_score_codex":0.000032530505,"about_ca_topic_score_gemma":0.0000099626595,"teacher_disagreement_score":0.9076756,"about_ca_system_score_codex":0.00029695468,"about_ca_system_score_gemma":0.00014456558,"threshold_uncertainty_score":0.7411781},"labels":[],"label_agreement":null},{"id":"W2400396649","doi":"10.1061/9780784479827.250","title":"Random Generation of Complex Data Structures for the Simulation of Construction Operations","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Randomness; Parametric statistics; Markov chain; Set (abstract data type); Process (computing); Pipeline (software); Data mining; Industrial engineering; Interdependence; Distributed computing; Engineering; Machine learning","score_opus":0.16323952456608698,"score_gpt":0.37708499350766844,"score_spread":0.21384546894158146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2400396649","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062462363,0.000657632,0.929888,0.0005676373,0.0032071506,0.0014521278,0.0010676852,0.00012569258,0.0005717221],"genre_scores_gemma":[0.99060315,0.00043905637,0.008126466,0.000005281014,0.00043326578,0.000099528275,0.00012865628,0.000025355645,0.00013925131],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99810624,0.00019089805,0.0006623232,0.0003002905,0.00048581618,0.0002544096],"domain_scores_gemma":[0.99637544,0.0011043341,0.00012626563,0.0007894522,0.00154173,0.000062764266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008537462,0.00016151779,0.00026324735,0.00031127044,0.00033319995,0.00006218227,0.0004305013,0.00014918027,0.00043326535],"category_scores_gemma":[0.00063049374,0.00009917406,0.0000787355,0.00034050934,0.001304522,0.00059195963,0.00007183686,0.00015056191,0.0000065530585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002220839,0.000018164628,0.00069242314,0.000109466266,0.00024662557,1.7050286e-7,0.0000881237,0.0673608,0.24330631,0.06101352,0.007037914,0.6199044],"study_design_scores_gemma":[0.00366099,0.00010305841,0.0009782742,0.00014304576,0.000088080415,0.000036642203,0.0006424105,0.8714507,0.091545045,0.0042505665,0.026822615,0.00027853175],"about_ca_topic_score_codex":0.000039204908,"about_ca_topic_score_gemma":0.000097593096,"teacher_disagreement_score":0.92814076,"about_ca_system_score_codex":0.000069737376,"about_ca_system_score_gemma":0.00017300277,"threshold_uncertainty_score":0.4806566},"labels":[],"label_agreement":null},{"id":"W2404039472","doi":"","title":"Bicircular Matroid Designs.","year":2013,"lang":"en","type":"article","venue":"Ars Combinatoria","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Matroid; Mathematics; Combinatorics","score_opus":0.008514013380461477,"score_gpt":0.19002088874504447,"score_spread":0.181506875364583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2404039472","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9784166,0.00030362437,0.00095793937,0.000068033885,0.002721234,0.00014500681,7.207224e-7,0.00046042298,0.016926369],"genre_scores_gemma":[0.9994602,0.000014055301,0.0002974,0.000032363365,0.000009545519,0.00004268046,0.000003156304,0.000016378144,0.00012421049],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996024,0.000010286593,0.000107523396,0.0000751498,0.000079303325,0.00012534179],"domain_scores_gemma":[0.99975103,0.000010975722,0.0000108772465,0.00013788344,0.000042283795,0.000046965462],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000029765612,0.00007954334,0.00007183095,0.000043759646,0.00003660223,0.00004510824,0.00007293581,0.00005821103,0.00045769638],"category_scores_gemma":[0.000005359122,0.00007854944,0.00003257468,0.00010840289,0.000017848472,0.00016528352,0.000006110566,0.000087026056,0.0009916835],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.969873e-7,0.000017558046,0.0019840084,0.000023281418,0.000043217144,0.0000020029267,0.000105806,0.00025754035,0.046807714,0.8997189,0.029931799,0.021107184],"study_design_scores_gemma":[0.00054894225,0.00004758883,0.008293252,0.000024818195,0.00002067359,0.00003299257,0.00016530957,0.01812954,0.049305376,0.9096762,0.013318295,0.0004370311],"about_ca_topic_score_codex":0.000023722156,"about_ca_topic_score_gemma":7.286113e-7,"teacher_disagreement_score":0.021043561,"about_ca_system_score_codex":0.00003475706,"about_ca_system_score_gemma":0.000006618305,"threshold_uncertainty_score":0.99978614},"labels":[],"label_agreement":null},{"id":"W2406231571","doi":"10.1016/j.proeng.2016.04.166","title":"Analysis of Costs and Benefits of Panelized and Modular Prefabricated Homes","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":123,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Modular design; Engineering; Cost–benefit analysis; Quality (philosophy); Prefabrication; Cost analysis; Quantitative analysis (chemistry); Risk analysis (engineering); Transport engineering; Construction engineering; Work (physics); Architectural engineering; Operations management; Computer science; Operations research; Civil engineering; Business","score_opus":0.006088195311162842,"score_gpt":0.17547429097875775,"score_spread":0.1693860956675949,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2406231571","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9857691,0.0017467011,0.012222484,0.000008993632,0.000045560653,0.000051784726,0.000017024522,0.00008323709,0.000055127362],"genre_scores_gemma":[0.9986952,0.0005842844,0.0006814251,7.2104245e-7,0.000010577394,0.000009430403,0.0000024756869,0.000010026316,0.0000058795176],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961716,0.0000019638333,0.00015758516,0.000084024774,0.00006250025,0.00007678257],"domain_scores_gemma":[0.9997888,0.00003535365,0.000025698511,0.00006719698,0.00004817449,0.000034744473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000036475478,0.000077848075,0.00018321155,0.00022883876,0.0000060911602,0.000004557121,0.000029097911,0.000044195353,0.000007669775],"category_scores_gemma":[0.000032854456,0.000060682927,0.000025062074,0.00030065875,0.00001859255,0.00008332802,0.000009490673,0.000027061997,2.1808863e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001947572,0.000014440498,0.06467383,0.0006014245,0.0012980842,3.923667e-7,0.00061604334,0.066739745,0.6609861,0.004916956,0.0000117179825,0.20012173],"study_design_scores_gemma":[0.0007261278,0.00003850111,0.34349838,0.00021746583,0.00053300883,0.000008937261,0.00006418505,0.4288425,0.22559156,0.000050804487,0.00013220354,0.0002963317],"about_ca_topic_score_codex":0.000004739397,"about_ca_topic_score_gemma":0.0000024043884,"teacher_disagreement_score":0.43539461,"about_ca_system_score_codex":0.000012724161,"about_ca_system_score_gemma":0.0000030617248,"threshold_uncertainty_score":0.2474578},"labels":[],"label_agreement":null},{"id":"W2409080671","doi":"10.1061/40475(278)14","title":"Strategy: A Construction Simulation Environment","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"University of Toronto; Microsoft Research","keywords":"Session (web analytics); Economic shortage; Process (computing); Control (management); Computer science; Construction industry; Construction management; Process management; Engineering management; Operations research; Engineering; Construction engineering; Civil engineering","score_opus":0.006933019976336167,"score_gpt":0.18574715760726276,"score_spread":0.1788141376309266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2409080671","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.553994,0.000090365116,0.101511,0.0000326623,0.00024677158,0.00012877957,0.0000037085356,0.00066879235,0.34332392],"genre_scores_gemma":[0.9976233,0.000046754147,0.0012706136,0.000011903226,0.000049615865,0.0000057753923,0.0000060776574,0.0000061871406,0.000979763],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997259,0.000004728522,0.000091578,0.000059486927,0.00005603687,0.00006231155],"domain_scores_gemma":[0.99990046,0.0000053933018,0.0000047371877,0.000062999636,0.000004267991,0.000022170385],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00001444172,0.000053269854,0.00003691433,0.000021971857,0.00002719155,0.00001776931,0.000017374174,0.000039990777,0.013434428],"category_scores_gemma":[3.664312e-7,0.00005069721,0.000017512752,0.000036164474,0.0000193993,0.00011580057,7.7817475e-7,0.000043025237,0.0005140108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014584327,0.0000017327988,0.00006469644,0.0000013221045,0.000003836827,1.0271087e-7,0.000010418589,0.5171254,0.00028913753,0.0022672608,0.000067865774,0.48016673],"study_design_scores_gemma":[0.00019519513,0.000019122679,0.0016501644,0.000003478316,0.000007717389,0.000014435037,0.000091323345,0.93798995,0.0023639025,0.002351033,0.055170976,0.00014267192],"about_ca_topic_score_codex":0.0000035687024,"about_ca_topic_score_gemma":0.0000016528384,"teacher_disagreement_score":0.48002407,"about_ca_system_score_codex":0.000026915026,"about_ca_system_score_gemma":0.000002485607,"threshold_uncertainty_score":0.9874674},"labels":[],"label_agreement":null},{"id":"W2410994761","doi":"10.1061/40475(278)4","title":"An Activity-Based Data Acquisition and Job Costing Model: A Case Study","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Activity-based costing; Job costing; Computer science; Data acquisition; Data modeling; Data model (GIS); Field (mathematics); Product cost management; Database; Artificial intelligence; Accounting; Business","score_opus":0.030024388147896975,"score_gpt":0.2733688871723672,"score_spread":0.2433444990244702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2410994761","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.933643,0.000008381065,0.06393748,0.000012023022,0.000028540953,0.00010525843,0.0000149575335,0.00025347766,0.001996869],"genre_scores_gemma":[0.9978454,0.0000017990686,0.0020282508,0.000027964968,0.000029937393,0.000007696052,0.000015126391,0.000009441704,0.0000343615],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996518,0.000017483635,0.0000711654,0.00013624354,0.000054615008,0.00006871269],"domain_scores_gemma":[0.9996756,0.000011732118,0.0000059337663,0.00025483983,0.0000127042995,0.000039189123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007379813,0.00006540593,0.000054293105,0.000032969387,0.000071900795,0.000057537778,0.000047153368,0.000029600196,0.00019710168],"category_scores_gemma":[0.0000013955356,0.00006203221,0.000005395752,0.00005849058,0.000010106333,0.00042890102,0.0000056488457,0.00006301147,0.0000049150544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027022317,0.00011324654,0.002806777,0.00001898137,0.000025274501,0.000115222545,0.0005069643,0.16878884,0.0039569098,0.00012881338,0.0002217642,0.82329017],"study_design_scores_gemma":[0.0002512132,0.00003544715,0.00038283583,0.0000032315643,0.000013040163,0.00018180325,0.00048593566,0.9981835,0.00033385554,0.00002333717,0.00002874515,0.00007704977],"about_ca_topic_score_codex":0.00022072077,"about_ca_topic_score_gemma":0.000441802,"teacher_disagreement_score":0.82939464,"about_ca_system_score_codex":0.0000127421,"about_ca_system_score_gemma":0.000007953016,"threshold_uncertainty_score":0.25296},"labels":[],"label_agreement":null},{"id":"W2418800452","doi":"","title":"ระบบการจดระบบความรดานวฒนธรรม (Cultural Knowledge Organization System)","year":2016,"lang":"th","type":"article","venue":"Journal of Information Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Knowledge management; Asset (computer security); Knowledge economy; Knowledge organization; Cultural knowledge; Cultural system; Value (mathematics); Process (computing); Dewey Decimal Classification; Business; Sociology; Computer science; Library classification; Library science; Social science","score_opus":0.007419785131254673,"score_gpt":0.22031633355555225,"score_spread":0.21289654842429756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2418800452","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42265993,0.00054345635,0.50456524,0.0009944194,0.018952243,0.00032611497,0.000037417893,0.00023350409,0.051687695],"genre_scores_gemma":[0.99817705,0.00020423405,0.0010579338,0.000026835722,0.00038669462,8.436254e-7,9.49071e-7,0.000007518911,0.00013796108],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977822,0.000034198787,0.0011489026,0.00007794391,0.00070629484,0.00025046262],"domain_scores_gemma":[0.9947105,0.00005317107,0.00079290196,0.00017009616,0.0040793167,0.00019398579],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0011781444,0.00016294209,0.0002122185,0.0007338027,0.0002760049,0.0004599314,0.00048806795,0.000108789725,0.00017255258],"category_scores_gemma":[0.00065649743,0.00009845835,0.00007644425,0.0018703573,0.00028246682,0.014576723,0.000043838252,0.00017273611,0.0007494512],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010319038,0.00006400986,0.005635992,0.0006578085,0.00012815493,0.000004834478,0.016426193,0.002556581,0.089181535,0.34574428,0.014339551,0.52515787],"study_design_scores_gemma":[0.009930636,0.0017142636,0.08451021,0.010793128,0.00048098076,0.010822588,0.050226867,0.05723649,0.46269965,0.0006891621,0.30787235,0.003023651],"about_ca_topic_score_codex":0.000002793035,"about_ca_topic_score_gemma":0.0000014789216,"teacher_disagreement_score":0.5755171,"about_ca_system_score_codex":0.0008831201,"about_ca_system_score_gemma":0.0005737929,"threshold_uncertainty_score":0.9992059},"labels":[],"label_agreement":null},{"id":"W24300061","doi":"10.1016/j.jaging.2013.09.004","title":"Effective and Innovative Practices for Stronger Facilities Management.","year":2002,"lang":"en","type":"article","venue":"Facilities manager","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facility management; Business; Higher education; Process management; Operations management; Knowledge management; Environmental planning; Environmental resource management; Engineering management; Public relations; Marketing; Economic growth; Engineering; Computer science; Economics; Political science; Environmental science","score_opus":0.016078186429610147,"score_gpt":0.2183495313882825,"score_spread":0.20227134495867236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W24300061","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29296592,0.0025083919,0.04406196,0.00038946772,0.001457402,0.0021638111,0.000663291,0.0010370432,0.65475273],"genre_scores_gemma":[0.87408155,0.0001605202,0.0012558489,0.000042435313,0.00007932864,0.0005638644,0.000022009554,0.000018852415,0.123775564],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934965,0.00001959978,0.00015613933,0.00018004567,0.00010011836,0.00019443904],"domain_scores_gemma":[0.99961436,0.00010642575,0.000048157104,0.00013046867,0.00007301,0.000027586027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007746911,0.00015691415,0.00013283394,0.00013173351,0.000095542964,0.00009264107,0.00006012838,0.00005824312,0.0005081781],"category_scores_gemma":[0.000035614616,0.00015183813,0.00003211923,0.00014230548,0.00009844587,0.0004616668,0.000022507033,0.000099921635,0.00007909816],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004917794,0.000031843556,0.00076303957,0.0020783052,0.0006955981,0.0000056354907,0.007358586,0.0004880553,0.00016374823,0.16658479,0.07486602,0.7469152],"study_design_scores_gemma":[0.00052953884,0.000054106797,0.0012957994,0.00002553391,0.000032008567,0.0000061026035,0.018633572,0.008776156,0.00037697886,0.002667181,0.96728575,0.00031724965],"about_ca_topic_score_codex":0.000021970276,"about_ca_topic_score_gemma":0.000017703967,"teacher_disagreement_score":0.89241976,"about_ca_system_score_codex":0.000040972307,"about_ca_system_score_gemma":0.0000011286195,"threshold_uncertainty_score":0.61917794},"labels":[],"label_agreement":null},{"id":"W24670910","doi":"10.1097/hp.0000000000000005","title":"Contribution à l'évaluation de la vulnérabilité sismique d'un bâtiment hospitalier","year":2011,"lang":"en","type":"dissertation","venue":"Health Physics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.009410836879159615,"score_gpt":0.26351405445963044,"score_spread":0.25410321758047083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W24670910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7800752,0.0052796737,0.15964273,0.00023269885,0.007278649,0.0028704514,0.00016957032,0.0017460334,0.042705026],"genre_scores_gemma":[0.9921193,0.0011400601,0.0020172053,0.0001923328,0.0006198512,0.00043228726,0.0027403324,0.000104257415,0.00063438085],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99873114,0.00017411793,0.00039780405,0.0002174143,0.00019827358,0.0002812658],"domain_scores_gemma":[0.9992719,0.00005168174,0.00017016438,0.0002178244,0.00018651206,0.00010186928],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00042406705,0.00024656122,0.0002782496,0.00005643266,0.00012761621,0.000034510427,0.00007810559,0.00036256996,0.000087220345],"category_scores_gemma":[0.000026075746,0.0002729379,0.0001029094,0.00014637386,0.000024457093,0.000116871786,0.0000037683583,0.00044056683,0.00005632336],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005868838,0.00017866307,0.0005484372,0.001177272,0.00019784033,0.0000013235956,0.006789176,0.0021746121,0.0018254645,0.15148534,0.0040463437,0.83151686],"study_design_scores_gemma":[0.0031887793,0.0007057122,0.095805734,0.0017612181,0.00048259433,0.000030411176,0.0023234722,0.0611758,0.1575882,0.6422599,0.031678043,0.0030001393],"about_ca_topic_score_codex":0.00009868487,"about_ca_topic_score_gemma":0.000033117918,"teacher_disagreement_score":0.8285167,"about_ca_system_score_codex":0.00040080672,"about_ca_system_score_gemma":0.0002931844,"threshold_uncertainty_score":0.9999723},"labels":[],"label_agreement":null},{"id":"W2467360950","doi":"10.1007/978-3-319-30337-6_2","title":"Improving the Delivery of a Building","year":2016,"lang":"en","type":"book-chapter","venue":"Studies in computational intelligence","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Product (mathematics); Order (exchange); Computer science; New product development; Risk analysis (engineering); Manufacturing engineering; Process management; Business; Engineering; Marketing; Finance","score_opus":0.04317774568115721,"score_gpt":0.2815628624929318,"score_spread":0.23838511681177457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2467360950","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006873922,0.030384019,0.74778837,0.00018906107,0.0041084746,0.00048760805,0.00007864696,0.00018840845,0.21608801],"genre_scores_gemma":[0.97696507,0.0032025387,0.006922359,0.000057526417,0.00038636982,0.000037637314,0.0000057917614,0.000055334956,0.012367351],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99918145,0.0000072874873,0.00039493377,0.00014227921,0.00017931398,0.00009471562],"domain_scores_gemma":[0.999085,0.00047079517,0.000099185454,0.00010463883,0.00022881174,0.000011570231],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011265327,0.00016147413,0.00019931734,0.00012431304,0.000048153906,0.000007770166,0.00015150534,0.0000805149,0.00004922265],"category_scores_gemma":[0.00003083564,0.000111536836,0.000070123315,0.000040877585,0.0002979619,0.000054777316,0.000057518333,0.0001931316,0.000016117341],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000041660987,0.0000015089948,0.0000076327615,0.000099426754,0.00012002193,0.0000020308046,0.00027534823,0.077305265,0.000033860066,0.71976674,0.0001905517,0.20219342],"study_design_scores_gemma":[0.0000775645,0.000039873,0.000020583167,0.0015105677,0.000043949163,0.00003068406,0.0005031678,0.08264744,0.00097507547,0.90838075,0.0053460924,0.00042424796],"about_ca_topic_score_codex":0.000003393365,"about_ca_topic_score_gemma":0.000015465785,"teacher_disagreement_score":0.9762777,"about_ca_system_score_codex":0.00012331302,"about_ca_system_score_gemma":0.00003196434,"threshold_uncertainty_score":0.454834},"labels":[],"label_agreement":null},{"id":"W2471628524","doi":"","title":"Pinchin Limited – Acoustics and Vibration Team","year":2016,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reputation; Engineering; Engineering management; Management; Acoustics; Sociology; Physics","score_opus":0.0055719474810550645,"score_gpt":0.17074687558720567,"score_spread":0.1651749281061506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2471628524","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42899328,0.00026588398,0.55278826,0.00069475,0.0019738595,0.00021316708,0.0002493762,0.00040651855,0.0144149065],"genre_scores_gemma":[0.9977547,0.00012512406,0.0013622247,0.00017037978,0.00017708527,0.0000054467246,0.000010425969,0.000020544046,0.00037408128],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953777,0.0000068982868,0.000118435986,0.0000935931,0.00005991334,0.00018340703],"domain_scores_gemma":[0.9995607,0.000030336565,0.000013378218,0.0001142547,0.00004955802,0.00023178429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000032522148,0.00009595135,0.00007001161,0.00013105641,0.0000705148,0.000039973078,0.000048174858,0.000110249486,0.000088398614],"category_scores_gemma":[0.000050820316,0.000079431935,0.000013262256,0.00009255265,0.000047006855,0.000103532155,0.0000041423195,0.00007337914,0.000038850685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005003129,0.000007101855,0.0019841054,0.00006112918,0.00005280201,0.000013053477,0.00025228166,0.004465232,0.6034516,0.012299718,0.071772315,0.30563563],"study_design_scores_gemma":[0.002045596,0.0001984589,0.23353167,0.00032415392,0.00027076618,0.00029382732,0.0010970832,0.65540016,0.006022616,0.009145797,0.08962355,0.0020463336],"about_ca_topic_score_codex":0.00046702396,"about_ca_topic_score_gemma":0.0028096745,"teacher_disagreement_score":0.65093493,"about_ca_system_score_codex":0.00015798741,"about_ca_system_score_gemma":0.00008961942,"threshold_uncertainty_score":0.32391402},"labels":[],"label_agreement":null},{"id":"W2474331869","doi":"10.3846/13923730.2014.914103","title":"EVALUATING MOTIVATION OF CONSTRUCTION WORKERS: A COMPARISON OF FUZZY RULE-BASED MODEL WITH THE TRADITIONAL EXPECTANCY THEORY","year":2016,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Expectancy theory; Fuzzy logic; Psychology; Productivity; Field (mathematics); Social psychology; Econometrics; Computer science; Mathematics; Artificial intelligence; Economics","score_opus":0.024623283852349673,"score_gpt":0.230449837680233,"score_spread":0.20582655382788334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2474331869","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2820151,0.00024013496,0.7168063,0.00010092988,0.00012595087,0.000070224676,0.0000023328334,0.000017443745,0.0006215967],"genre_scores_gemma":[0.990061,0.00003548749,0.0098348195,0.000002880909,0.000037688766,0.000006906027,5.6864843e-7,0.000008858334,0.000011802639],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993471,0.000016000085,0.0002998159,0.000048630685,0.00022261417,0.000065856075],"domain_scores_gemma":[0.9995622,0.0000945659,0.00016578249,0.00006615407,0.00008974143,0.000021549447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025180983,0.00008103717,0.00014078646,0.00014321813,0.000021718042,0.00000838616,0.000051344752,0.000025418241,0.000010436192],"category_scores_gemma":[0.000013750049,0.000047354617,0.00004195524,0.00009615657,0.000041999243,0.00011779581,0.000004250973,0.00006934264,8.633366e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006810931,0.000020203943,0.0005977051,0.00016004687,0.00015582943,3.6723497e-7,0.0001994269,0.92362916,0.006850863,0.033152588,0.00010801082,0.035057712],"study_design_scores_gemma":[0.002838126,0.00040429735,0.010145293,0.0021634074,0.000309717,0.00004249356,0.0022784076,0.96321154,0.0120592015,0.0061395424,0.00014425535,0.00026372835],"about_ca_topic_score_codex":2.7161525e-7,"about_ca_topic_score_gemma":0.0000021653295,"teacher_disagreement_score":0.7080459,"about_ca_system_score_codex":0.000034343528,"about_ca_system_score_gemma":0.000012971828,"threshold_uncertainty_score":0.19310652},"labels":[],"label_agreement":null},{"id":"W2475055653","doi":"","title":"KR Moeller Associates Ltd","year":2016,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Sound (geography); Telecommunications; Masking (illustration); Paging; Launched; Computer science; Operating system; Electrical engineering; Acoustics; Art; Visual arts","score_opus":0.005110296443099889,"score_gpt":0.16679909156581643,"score_spread":0.16168879512271656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2475055653","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6319913,0.0007868738,0.13055156,0.0030080876,0.008944714,0.00029520688,0.00063803594,0.0010595934,0.2227246],"genre_scores_gemma":[0.996527,0.000044667013,0.0002400118,0.00012244897,0.00015291368,0.0000037362176,0.0000032140267,0.00001461569,0.0028914],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996484,0.000003730291,0.00007278411,0.000054853183,0.00004584541,0.00017437065],"domain_scores_gemma":[0.99968916,0.000019703017,0.0000075109624,0.00008253603,0.000040594085,0.00016051],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000023924178,0.000060285383,0.00004946713,0.000066347835,0.000039196846,0.000017529752,0.00005161978,0.00007915708,0.0005049033],"category_scores_gemma":[0.00003178918,0.000047943362,0.000018577048,0.00006120539,0.000020545403,0.000045429548,0.0000018745916,0.00004935919,0.00029264647],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015339762,0.000004605921,0.0074995914,0.000025477717,0.00009882692,0.000023594344,0.00021991297,0.0019586082,0.11568823,0.018297577,0.5523356,0.30384645],"study_design_scores_gemma":[0.0013474638,0.00006381457,0.12715067,0.00020925624,0.00014696646,0.000074139505,0.00068435795,0.046635795,0.0094241835,0.014564403,0.79794115,0.0017577893],"about_ca_topic_score_codex":0.0011290503,"about_ca_topic_score_gemma":0.008093478,"teacher_disagreement_score":0.36453566,"about_ca_system_score_codex":0.0002487846,"about_ca_system_score_gemma":0.00007320059,"threshold_uncertainty_score":0.55283374},"labels":[],"label_agreement":null},{"id":"W2475332182","doi":"10.18564/jasss.3137","title":"Using Computational Modeling for Building Theory: A Double Edged Sword","year":2016,"lang":"en","type":"article","venue":"Journal of Artificial Societies and Social Simulation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Saskatchewan","funders":"","keywords":"SWORD; Computer science; World Wide Web","score_opus":0.05917228946589022,"score_gpt":0.3056728969161877,"score_spread":0.2465006074502975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2475332182","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4261136,0.000049000922,0.573403,0.000113014685,0.0002456944,0.00004242311,0.000002302139,0.000013426676,0.000017522929],"genre_scores_gemma":[0.99381125,0.0000075725015,0.0053895805,0.000016964264,0.0007524403,0.0000011732094,9.355916e-7,0.000010821021,0.000009239362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994353,0.00001724256,0.00028259028,0.000049000802,0.00012309977,0.00009276451],"domain_scores_gemma":[0.99953675,0.00010251907,0.00009731517,0.000015782054,0.00022524873,0.000022408172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027696145,0.00006597432,0.00011901959,0.000044614062,0.00026912597,0.000053856813,0.000026653512,0.00008022259,0.000010188373],"category_scores_gemma":[0.000013994481,0.000051584404,0.00009811949,0.000047949765,0.00003777953,0.0002548109,0.000004463081,0.000057081343,2.1601383e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115536175,0.0000055250625,0.000036242895,0.000013772407,0.000039055278,7.019123e-8,0.0011018292,0.89880353,0.005816871,0.04797917,0.000033421133,0.04605497],"study_design_scores_gemma":[0.00040362097,0.000018109671,0.000022035767,0.000020323256,0.000027161288,0.0000015157486,0.00077497045,0.85368174,0.00026909073,0.14447777,0.0002359184,0.00006774473],"about_ca_topic_score_codex":0.0000011734367,"about_ca_topic_score_gemma":9.513647e-7,"teacher_disagreement_score":0.5680134,"about_ca_system_score_codex":0.00007906,"about_ca_system_score_gemma":0.000025300702,"threshold_uncertainty_score":0.2103551},"labels":[],"label_agreement":null},{"id":"W2476289924","doi":"10.1201/b17017-49","title":"Parallel processing of excavation in soils with randomly generated material properties","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soil water; Excavation; Geology; Materials science; Environmental science; Geotechnical engineering; Soil science","score_opus":0.012429922533897764,"score_gpt":0.1708347779106173,"score_spread":0.15840485537671953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2476289924","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05011961,0.00065622194,0.08528384,0.000057611902,0.00078862306,0.0010059286,0.000015778416,0.00059721776,0.86147517],"genre_scores_gemma":[0.88526124,0.000083802006,0.0019011375,0.000017885,0.00024158259,0.00005633068,0.000083999184,0.000077955934,0.11227606],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993944,0.000005551054,0.00030085817,0.0001110362,0.0001094608,0.000078647965],"domain_scores_gemma":[0.99973655,0.0000029397202,0.00007189073,0.00008008336,0.00009417161,0.00001439384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000050240298,0.00016811768,0.00024832174,0.00012625061,0.000015371197,0.000032271415,0.000042003743,0.00017674561,0.00020167216],"category_scores_gemma":[0.000001706174,0.00011890811,0.0000220647,0.000022540777,0.00004232568,0.00007916809,0.0000039620872,0.000099462515,0.000006787833],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034975812,0.00003871904,0.0001591475,0.0051398193,0.00046302137,0.000010326831,0.0015872646,0.11629951,0.14181297,0.32364878,0.0035058074,0.40383705],"study_design_scores_gemma":[0.023406038,0.0008706794,0.00040625068,0.011586882,0.0005114208,0.0002038969,0.00034601672,0.43928862,0.43035185,0.014488015,0.07292507,0.005615274],"about_ca_topic_score_codex":0.000019388988,"about_ca_topic_score_gemma":0.00010879146,"teacher_disagreement_score":0.83514166,"about_ca_system_score_codex":0.000029308174,"about_ca_system_score_gemma":0.000034849305,"threshold_uncertainty_score":0.4848932},"labels":[],"label_agreement":null},{"id":"W2477021807","doi":"10.1142/9789813143401_0061","title":"Numerical simulation of dust concentration distribution in construction industries","year":2016,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Distribution (mathematics); Computer simulation; Environmental science; Computer science; Mining engineering; Geology; Simulation; Mathematics","score_opus":0.00957749326127136,"score_gpt":0.21279902698253683,"score_spread":0.20322153372126547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2477021807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5019636,0.000019845358,0.49524808,0.00009780475,0.00033775673,0.00009505527,0.000017363436,0.000118559765,0.002101881],"genre_scores_gemma":[0.99975437,0.000014044115,0.00012993936,0.000002936616,0.000035911828,0.0000061555393,0.000027424974,0.0000043102273,0.000024883357],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995178,0.000015952368,0.00023343509,0.00007094259,0.000081461505,0.00008041439],"domain_scores_gemma":[0.99978167,0.00004477127,0.00003324488,0.000059191767,0.000061014976,0.00002012586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042619344,0.00006127521,0.000079606936,0.000032871238,0.000014112877,0.0000073162755,0.000022747778,0.00009707256,0.00017232794],"category_scores_gemma":[0.000040830688,0.000045749908,0.0000159349,0.0002021951,0.00005658146,0.00025651208,0.0000021005621,0.00004983255,0.000008743047],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048096594,0.000027249449,0.09138423,0.00002541623,0.000019331297,5.072226e-7,0.00009205093,0.11188891,0.026617913,0.07680422,0.00045378908,0.6926383],"study_design_scores_gemma":[0.002137804,0.000097912285,0.10242283,0.0001880535,0.00001980276,0.000018167299,0.00044051357,0.53066534,0.35289043,0.0040769195,0.0065919673,0.00045024755],"about_ca_topic_score_codex":0.000015293908,"about_ca_topic_score_gemma":0.000007770338,"teacher_disagreement_score":0.692188,"about_ca_system_score_codex":0.00009111288,"about_ca_system_score_gemma":0.000015716694,"threshold_uncertainty_score":0.18868701},"labels":[],"label_agreement":null},{"id":"W2477850933","doi":"10.1007/978-3-319-33681-7_42","title":"BIM for Corporate Real Estate Data Visualization from Disparate Systems","year":2016,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Property management; Corporate Real Estate; Real estate; Facility management; Visualization; Context (archaeology); Computer science; Data science; Building information modeling; Data management; Management information systems; Information visualization; Information system; Knowledge management; Systems engineering; Engineering; Business; Data mining; Finance; Scheduling (production processes); Operations management","score_opus":0.048771580604293006,"score_gpt":0.2537880483949996,"score_spread":0.20501646779070656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2477850933","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00031993867,0.0002346967,0.9939993,0.00008912503,0.0013945756,0.0005587913,0.0012319033,0.0001048752,0.002066789],"genre_scores_gemma":[0.034037873,0.0030927816,0.95930487,0.000051784806,0.0009344666,0.00013301999,0.0021663415,0.00009249769,0.00018633626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903995,0.0000058824235,0.000545767,0.00012402139,0.00013598123,0.00014837488],"domain_scores_gemma":[0.99871194,0.00020735885,0.0003814143,0.00052063225,0.00014629003,0.000032354055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019057127,0.00022374584,0.00028088543,0.00012214769,0.0004153106,0.00016879589,0.0008909116,0.00018840251,8.909526e-7],"category_scores_gemma":[0.000021665743,0.00016796247,0.00007982249,0.000095157746,0.00022254173,0.00035646316,0.0002015813,0.00014867556,6.287984e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028505956,0.0000032018895,0.000003688705,0.0002349793,0.00012112622,1.74265e-8,0.00038985157,0.87619746,0.00003608193,0.08600631,0.0001750902,0.036829352],"study_design_scores_gemma":[0.0001785237,0.000020547817,0.000011532365,0.00023248685,0.00006236982,0.0000022852892,0.0000051646834,0.9577543,0.000058892445,0.0012903417,0.04016458,0.00021897197],"about_ca_topic_score_codex":0.000045505683,"about_ca_topic_score_gemma":0.000115150884,"teacher_disagreement_score":0.08471597,"about_ca_system_score_codex":0.00005547556,"about_ca_system_score_gemma":0.000077079334,"threshold_uncertainty_score":0.68493104},"labels":[],"label_agreement":null},{"id":"W2485420449","doi":"10.1061/(asce)co.1943-7862.0001214","title":"Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Work breakdown structure; Computer science; Flow network; Network planning and design; Industrial engineering; Operations research; Reliability engineering; Engineering; Systems engineering; Project management; Project planning; Mathematical optimization","score_opus":0.013858113457767695,"score_gpt":0.2069908226303679,"score_spread":0.1931327091726002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2485420449","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017899828,0.0003579724,0.9805791,0.000025729843,0.00057329185,0.00036822673,0.000010835608,0.0001412183,0.000043837306],"genre_scores_gemma":[0.42515084,0.00019189874,0.57428473,0.000006861061,0.00029181418,0.000024203631,0.00001214545,0.000022551034,0.000014949239],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913836,0.000016228973,0.00041887208,0.00012555307,0.00013340017,0.00016758071],"domain_scores_gemma":[0.9995643,0.000026203556,0.0001709881,0.00008251942,0.00011685879,0.000039116374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017832896,0.00016418693,0.00022417401,0.00022744559,0.000058824884,0.000045410532,0.00004609395,0.00010749619,0.0000018974325],"category_scores_gemma":[0.00000918877,0.00012694095,0.000052807198,0.00024201901,0.000035634293,0.00019733245,0.000009825629,0.000092711285,1.4776487e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052085088,0.0000049286855,0.00016064565,0.00016975598,0.0001289009,5.2061296e-7,0.00005477536,0.9717048,0.00019882983,0.00091833627,0.0012995071,0.025306912],"study_design_scores_gemma":[0.000867909,0.00004868772,0.00013886589,0.00028373444,0.00009103488,0.00006730041,0.00002642564,0.99780935,0.00009996324,0.000045282773,0.00038171984,0.00013974986],"about_ca_topic_score_codex":4.1397888e-7,"about_ca_topic_score_gemma":3.4134746e-7,"teacher_disagreement_score":0.407251,"about_ca_system_score_codex":0.000038945698,"about_ca_system_score_gemma":0.000025763202,"threshold_uncertainty_score":0.5176502},"labels":[],"label_agreement":null},{"id":"W2487401600","doi":"","title":"CIVCAP 2012: Laying Concrete Foundations","year":2012,"lang":"en","type":"article","venue":"BIBSYS Brage (BIBSYS (Norway))","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Laying; Engineering; Structural engineering","score_opus":0.017122887083368867,"score_gpt":0.22785389338858558,"score_spread":0.2107310063052167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2487401600","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45496625,0.0061742696,0.08254927,0.00041802408,0.01759779,0.0010217779,0.00024176955,0.0022533336,0.43477753],"genre_scores_gemma":[0.9931882,0.00015471253,0.0018941694,0.00012128727,0.0012686556,0.000110284884,0.00009800692,0.00008131199,0.0030833553],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982687,0.00006491531,0.00046504167,0.0002531135,0.0002973555,0.0006508397],"domain_scores_gemma":[0.9989524,0.00013365428,0.000084850035,0.0004534074,0.00010580178,0.0002698853],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00026968188,0.00032978063,0.0002775934,0.00037516994,0.00028580523,0.00016373374,0.00023108826,0.0002344859,0.0041565094],"category_scores_gemma":[0.00005785755,0.00033750886,0.00015173494,0.0006705006,0.00008747578,0.0013283906,0.00004653306,0.0003614326,0.0033330931],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001655521,0.00012275598,0.019354885,0.0007254056,0.0011396849,0.000023498846,0.004990553,0.002646893,0.19771908,0.28594592,0.24917014,0.23799564],"study_design_scores_gemma":[0.0039645177,0.00020898649,0.025456365,0.00024617236,0.00034778405,0.00027499528,0.002620552,0.016834732,0.012639482,0.001370946,0.9331706,0.0028648623],"about_ca_topic_score_codex":0.000033360615,"about_ca_topic_score_gemma":0.000036889658,"teacher_disagreement_score":0.6840005,"about_ca_system_score_codex":0.00013910812,"about_ca_system_score_gemma":0.000032095755,"threshold_uncertainty_score":0.9999077},"labels":[],"label_agreement":null},{"id":"W2491560895","doi":"10.1061/(asce)co.1943-7862.0001213","title":"Genetic Algorithm–Simulation Framework for Decision Making in Construction Site Layout Planning","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"","keywords":"Closeness; Genetic algorithm; Heuristic; Computer science; Function (biology); Mathematical optimization; Industrial engineering; Algorithm; Machine learning; Engineering; Artificial intelligence; Mathematics","score_opus":0.006844433011699463,"score_gpt":0.23554017794394233,"score_spread":0.22869574493224287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2491560895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12810045,0.00033384567,0.8696578,0.000022713235,0.0016464413,0.00013051862,0.0000037663435,0.00005667397,0.00004777294],"genre_scores_gemma":[0.57089996,0.00019453751,0.42871633,0.0000051632437,0.00015917611,0.000007804768,2.8275116e-7,0.000013571476,0.000003127308],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991121,0.000009046109,0.000469751,0.00011235907,0.00014630354,0.00015042562],"domain_scores_gemma":[0.9995082,0.00016948265,0.00012274552,0.0000788859,0.00007535273,0.000045342927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015420969,0.00013453476,0.00017592152,0.00048354117,0.00003906454,0.00004373845,0.000048810674,0.000093052135,0.00001147887],"category_scores_gemma":[0.00004453818,0.00011276996,0.000057557194,0.00015986971,0.000029001425,0.00025841687,0.0000109504845,0.00011505249,0.0000010520899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023373688,0.0000029536639,0.0011548313,0.000054330154,0.000039199447,0.0000049131654,0.00005560252,0.379224,0.00015539242,0.005485247,0.000015849262,0.6137843],"study_design_scores_gemma":[0.0020619999,0.00012456748,0.029634522,0.0037654855,0.000121775876,0.00076813897,0.00049722026,0.93565345,0.0002953335,0.018598411,0.008001005,0.00047808175],"about_ca_topic_score_codex":2.8655435e-7,"about_ca_topic_score_gemma":3.4579813e-7,"teacher_disagreement_score":0.6133062,"about_ca_system_score_codex":0.000105807936,"about_ca_system_score_gemma":0.0000065858176,"threshold_uncertainty_score":0.45986253},"labels":[],"label_agreement":null},{"id":"W2499344398","doi":"10.1090/fim/027/07","title":"Lift-and-project procedures for combinatorial optimization problems","year":2010,"lang":"en","type":"book-chapter","venue":"American Mathematical Society eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Lift (data mining); Computer science; Operations research; Engineering; Data mining","score_opus":0.010604323546826094,"score_gpt":0.2209967224266219,"score_spread":0.21039239887979583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499344398","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011364511,0.00016184505,0.33675456,0.00013325518,0.0009419068,0.0025377532,0.00009479965,0.0010583707,0.6582039],"genre_scores_gemma":[0.016643021,0.0005844462,0.7332367,0.00069050316,0.0034954837,0.002563975,0.00033386605,0.0011013525,0.24135067],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989933,0.000004327803,0.00035427994,0.00025398933,0.00018744942,0.0002066505],"domain_scores_gemma":[0.99938554,0.00011110985,0.00014090314,0.000182973,0.00010336699,0.00007612172],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009437673,0.00032535696,0.0004333362,0.000029185157,0.00011974764,0.00007828808,0.00010575212,0.00035829033,0.000061193314],"category_scores_gemma":[0.000029989844,0.0002940362,0.00024998144,0.000018507439,0.0004732906,0.00003684299,0.000024733325,0.00043663656,0.000008852204],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011119731,0.000014554318,7.662763e-7,0.0013337275,0.0003018607,2.438825e-7,0.0011612648,0.00023194855,0.00035447616,0.97366583,0.0039260313,0.018998193],"study_design_scores_gemma":[0.00090673624,0.00031640314,6.6967397e-7,0.0005221613,0.00041006962,0.000045451274,0.0003792151,0.10705031,0.00045946633,0.74474555,0.14386918,0.0012947895],"about_ca_topic_score_codex":0.0000033376518,"about_ca_topic_score_gemma":0.000002712734,"teacher_disagreement_score":0.41685322,"about_ca_system_score_codex":0.00005064586,"about_ca_system_score_gemma":0.00007518976,"threshold_uncertainty_score":0.9999512},"labels":[],"label_agreement":null},{"id":"W2499962443","doi":"","title":"Design and Construction of Building Components with Fibre Reinforced Polymer - A New Canadian Standard","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Forensic engineering","score_opus":0.009436331957811826,"score_gpt":0.1854103358008165,"score_spread":0.17597400384300468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499962443","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38409117,0.000084117266,0.6115742,0.00006894101,0.00009892812,0.000093422015,0.0000025304569,0.000074201016,0.0039125225],"genre_scores_gemma":[0.96785504,0.000027039043,0.031651214,0.00001634696,0.000019900095,0.0000017804854,0.0000029053037,0.000008659318,0.00041709997],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99966574,0.0000055926103,0.00010245984,0.000060164457,0.000066115834,0.00009992796],"domain_scores_gemma":[0.9997864,0.000008450685,0.000016105894,0.000056855195,0.00002673484,0.00010545746],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002391917,0.00006803647,0.00008088067,0.00009957609,0.00003631917,0.000018761617,0.000022378445,0.000042311676,0.00017171157],"category_scores_gemma":[0.0000014139323,0.00005840694,0.000008799428,0.00010670953,0.000034906032,0.00011931103,0.000001944031,0.00004527625,9.682407e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064817094,0.00000419206,0.016410999,0.00011627079,0.00040679154,0.00002804019,0.0011943118,0.05677366,0.20730361,0.2774448,0.003912765,0.4357564],"study_design_scores_gemma":[0.0042343857,0.00050140545,0.0034778924,0.000383229,0.00011797661,0.0022951346,0.0015393926,0.33551976,0.6383231,0.001377192,0.011182262,0.0010482756],"about_ca_topic_score_codex":0.014701865,"about_ca_topic_score_gemma":0.0035496512,"teacher_disagreement_score":0.5837639,"about_ca_system_score_codex":0.000041735297,"about_ca_system_score_gemma":0.00006401344,"threshold_uncertainty_score":0.9918593},"labels":[],"label_agreement":null},{"id":"W2503295872","doi":"10.1007/978-3-319-62274-3","title":"Engineering Asset Management 2016","year":2017,"lang":"en","type":"book","venue":"Lecture notes in mechanical engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Asset management; Asset (computer security); Engineering management; Business; Engineering; Computer science; Computer security; Finance","score_opus":0.005742518098853264,"score_gpt":0.1950162841404571,"score_spread":0.18927376604160384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2503295872","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000044156695,0.0018135412,0.94418097,0.000052403615,0.004756438,0.00049045676,0.00003772602,0.0012250482,0.04739927],"genre_scores_gemma":[0.52007854,0.010328154,0.27030087,0.00058836595,0.017014636,0.002232321,0.0020183534,0.004979868,0.17245889],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982132,0.0000075316593,0.00049181323,0.0004539602,0.00031204938,0.0005214638],"domain_scores_gemma":[0.99894106,0.00012851189,0.0000684823,0.0007036879,0.000031572396,0.00012667936],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017297683,0.00063513947,0.00057812664,0.00044533762,0.000048216436,0.0001277232,0.0005065287,0.0008820096,0.00016552539],"category_scores_gemma":[0.0001067605,0.00067466917,0.00019965103,0.00010445092,0.00001551734,0.00013932266,0.00009383774,0.0014331433,0.00011975661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008349622,0.0000122252,0.0000016512686,0.0011865349,0.00031219434,0.00015312582,0.000029741017,0.8501329,0.0021715735,0.03336029,0.0027779934,0.10985345],"study_design_scores_gemma":[0.00064399344,0.000034819586,0.000027779584,0.0025705635,0.00013441993,0.00008134848,0.0000010813912,0.686575,0.004222592,0.008331313,0.29574928,0.001627846],"about_ca_topic_score_codex":0.0000030324811,"about_ca_topic_score_gemma":0.000012877689,"teacher_disagreement_score":0.6738801,"about_ca_system_score_codex":0.000543114,"about_ca_system_score_gemma":0.00003976487,"threshold_uncertainty_score":0.9995704},"labels":[],"label_agreement":null},{"id":"W2504132119","doi":"10.1155/2016/2312057","title":"An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Scheduling (production processes); Schedule; Operations research; Parametric statistics; Randomness; Conceptual design; Industrial engineering; Engineering; Computer science; Systems engineering; Operations management","score_opus":0.008098464830622399,"score_gpt":0.21725553795565705,"score_spread":0.20915707312503465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2504132119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18924364,0.00020567466,0.80730206,0.00005431229,0.002833834,0.000086403874,0.000009444062,0.00023330771,0.00003133677],"genre_scores_gemma":[0.82687,0.000044798548,0.17224534,0.000005493917,0.00077869906,0.000012373694,0.0000020231514,0.000033122767,0.000008137043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989856,0.000016884313,0.0005719762,0.000101800455,0.0001460548,0.00017767829],"domain_scores_gemma":[0.9992273,0.000053747102,0.0000775486,0.00012642435,0.00039091156,0.00012407501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020717959,0.0001619194,0.0002274953,0.00031075816,0.00008238066,0.000063026884,0.00010664116,0.000111511115,0.000026367252],"category_scores_gemma":[0.00006806949,0.00012217458,0.000116637086,0.00017324623,0.000029309751,0.0008211626,0.000003841522,0.00016215336,0.000003704678],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034864937,0.000009378291,0.00009898838,0.00006563902,0.00010331975,0.000003392537,0.00012537396,0.5820675,0.3043192,0.008039973,0.000036649806,0.10509571],"study_design_scores_gemma":[0.0011869033,0.00014904533,0.000085953434,0.0007455617,0.00003968786,0.0017483946,0.0012636462,0.85036653,0.13517112,0.000027621652,0.008878131,0.00033740807],"about_ca_topic_score_codex":0.0000023145612,"about_ca_topic_score_gemma":0.0000024831684,"teacher_disagreement_score":0.6376264,"about_ca_system_score_codex":0.00018714672,"about_ca_system_score_gemma":0.00006136889,"threshold_uncertainty_score":0.49821347},"labels":[],"label_agreement":null},{"id":"W2507978271","doi":"10.1136/oemed-2016-103951.443","title":"P126 A task-based silica exposure modelling tool for construction companies","year":2016,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Task (project management); Computer science; Engineering; Systems engineering","score_opus":0.01232358746627903,"score_gpt":0.19352111432038285,"score_spread":0.1811975268541038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2507978271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09765454,0.00004845295,0.8997329,0.00013729393,0.0004234088,0.00015529964,0.000020917612,0.00041747553,0.0014097582],"genre_scores_gemma":[0.96812314,0.000010966806,0.03148501,0.000030731542,0.0000987233,0.00006883049,0.000006260481,0.000014567198,0.00016178853],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952465,0.0000064256487,0.00016738965,0.000110753426,0.000066994115,0.00012375914],"domain_scores_gemma":[0.9997129,0.00005998568,0.00001861091,0.00011021064,0.00007128722,0.000027040263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000040057497,0.000095721836,0.000093496434,0.000054914704,0.00005520438,0.00002530995,0.000042995718,0.00007022738,0.00011794163],"category_scores_gemma":[0.000006870154,0.00006693056,0.000048077865,0.000054584998,0.000041365936,0.0001373874,0.0000024188632,0.000034503668,0.000020955249],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008312342,0.000021455999,0.0009600955,0.00009695608,0.00007255192,3.780455e-7,0.00010023784,0.23811686,0.14689144,0.13551451,0.0031117967,0.47503057],"study_design_scores_gemma":[0.0012861647,0.00008646557,0.000078768,0.00006234034,0.000025942929,0.000010328144,0.00014032632,0.81574035,0.14244503,0.005514298,0.034261424,0.00034854026],"about_ca_topic_score_codex":0.0000032269581,"about_ca_topic_score_gemma":0.000007495632,"teacher_disagreement_score":0.8704686,"about_ca_system_score_codex":0.000036085035,"about_ca_system_score_gemma":0.000015263427,"threshold_uncertainty_score":0.2729349},"labels":[],"label_agreement":null},{"id":"W2513817582","doi":"","title":"Changing Standards for Building Acoustics Regulation","year":2016,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ceiling (cloud); Flanking maneuver; Transmission (telecommunications); Sound transmission class; Architectural acoustics; Engineering; European standard; National standard; Class (philosophy); Structural engineering; Computer science; Acoustics; Engineering drawing; Architectural engineering; Telecommunications; Civil engineering; Electrical engineering","score_opus":0.007509003998366023,"score_gpt":0.21127605355599044,"score_spread":0.20376704955762442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2513817582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03523542,0.000062137246,0.9612217,0.00012516009,0.00135658,0.00014104412,0.00051569333,0.00015280712,0.0011894492],"genre_scores_gemma":[0.9922601,0.00002414967,0.00667685,0.000060284594,0.00042597862,0.000020051337,0.000011667651,0.000033412103,0.00048751172],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933606,0.000003986265,0.00013594312,0.00009980913,0.00010755871,0.00031663908],"domain_scores_gemma":[0.9994519,0.00004496795,0.00001898561,0.00012026963,0.00018940141,0.00017449369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011657447,0.00009959664,0.00008224926,0.00023800878,0.00012384888,0.00003600615,0.000063330146,0.0001049031,0.00009941641],"category_scores_gemma":[0.00010292209,0.00008751716,0.00003209519,0.00013673323,0.000027948134,0.00009457451,0.0000034879838,0.000047132762,0.0000067004057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007970526,0.000002308498,0.00012991001,0.00011399589,0.000049297287,0.0000037366722,0.0002120416,0.028134162,0.5158344,0.035875008,0.035094474,0.3845427],"study_design_scores_gemma":[0.0017303181,0.00010711306,0.00582242,0.00052236306,0.00022602438,0.00006601853,0.0008608977,0.75403076,0.022242637,0.019983627,0.19301523,0.001392589],"about_ca_topic_score_codex":0.00007929769,"about_ca_topic_score_gemma":0.0005335061,"teacher_disagreement_score":0.9570247,"about_ca_system_score_codex":0.00067912426,"about_ca_system_score_gemma":0.00020722223,"threshold_uncertainty_score":0.35688463},"labels":[],"label_agreement":null},{"id":"W2515918935","doi":"","title":"Opzetten van een begrotingsprogramma voor hout-gestookte warmtekrachtkoppelingen in Excel","year":2015,"lang":"nl","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Art; Humanities","score_opus":0.027416961460970567,"score_gpt":0.23839849379551845,"score_spread":0.2109815323345479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2515918935","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53214526,0.0054034027,0.030263389,0.0048564253,0.010743642,0.001994644,0.000057959856,0.0021621352,0.41237316],"genre_scores_gemma":[0.97991097,0.000076849916,0.0049522254,0.00022734722,0.00079864,0.000072474526,0.000040240884,0.0000946575,0.013826614],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99757457,0.00008475356,0.00076527183,0.00048157887,0.00041732006,0.0006765153],"domain_scores_gemma":[0.9988305,0.00004564689,0.00011080059,0.00042570042,0.00020495201,0.00038240134],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00055724516,0.00043939016,0.00042456065,0.00032029036,0.000070462054,0.00022026866,0.00031452917,0.00041015915,0.00076914224],"category_scores_gemma":[0.00011741873,0.0004352972,0.00014600485,0.0005160911,0.00009099042,0.000433416,0.00008136916,0.0006394714,0.0022604105],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013889566,0.00029680182,0.062419366,0.00024245062,0.00026885603,0.00008355753,0.005604522,0.009897575,0.0013645337,0.020509021,0.02519696,0.8739775],"study_design_scores_gemma":[0.008690071,0.0007816243,0.019420044,0.0007059227,0.00039456887,0.00027118222,0.01349172,0.28197464,0.0069849133,0.008267771,0.65506154,0.0039560045],"about_ca_topic_score_codex":0.0012859076,"about_ca_topic_score_gemma":0.0010172667,"teacher_disagreement_score":0.87002146,"about_ca_system_score_codex":0.000333509,"about_ca_system_score_gemma":0.00013558021,"threshold_uncertainty_score":0.99980986},"labels":[],"label_agreement":null},{"id":"W2522637456","doi":"10.11159/mhci16.107","title":"Comparing Simulation Use Cases in Building Design for Developing an User-centric Simulation Platform","year":2016,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation of Korea; Ministry of Trade, Industry and Energy; National Research Foundation","keywords":"Computer science; User-centered design; Human–computer interaction","score_opus":0.03347910385449664,"score_gpt":0.2447680538223828,"score_spread":0.21128894996788614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2522637456","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7615299,0.000058281068,0.2376605,0.000010006256,0.00045253115,0.00022074484,5.918833e-7,0.00006337093,0.0000040589784],"genre_scores_gemma":[0.9969279,0.000008515212,0.0029489642,0.0000046857417,0.00006917982,0.000016547594,8.195118e-8,0.000009160832,0.000014974644],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921054,0.0000031752145,0.00023352586,0.00019623894,0.00015212777,0.0002043944],"domain_scores_gemma":[0.99931246,0.0004091341,0.000057902515,0.00004923317,0.000121594036,0.000049685645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002556992,0.0001174313,0.00015802396,0.0003345861,0.00010536063,0.00018525086,0.00012790365,0.00003381996,7.644019e-8],"category_scores_gemma":[0.00009077947,0.00007830062,0.000016642434,0.00058301596,0.00004137316,0.0006450274,0.000024062367,0.00006936444,4.829512e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018237843,0.000005595587,0.0052042776,0.000064708955,0.000005537012,1.4437451e-7,0.000034501914,0.9401638,0.0048693963,0.037742667,0.000004639559,0.011886529],"study_design_scores_gemma":[0.0002480632,0.000046667195,0.007298189,0.00035810485,0.000004190977,0.000007792061,0.0000038318826,0.988371,0.0033553352,0.000044031738,0.0001390546,0.00012373723],"about_ca_topic_score_codex":0.000006520935,"about_ca_topic_score_gemma":0.000001676972,"teacher_disagreement_score":0.23539798,"about_ca_system_score_codex":0.000094632145,"about_ca_system_score_gemma":0.000013394237,"threshold_uncertainty_score":0.31930065},"labels":[],"label_agreement":null},{"id":"W2523796925","doi":"","title":"Proceedings of the Sixth International Conference on Computer Supported Cooperative Work in Design","year":2001,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Engineering ethics; Engineering; Computer science; Library science; Political science; Mechanical engineering","score_opus":0.02304660526378758,"score_gpt":0.2195747848954352,"score_spread":0.19652817963164762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523796925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85541457,0.000002697393,0.020906739,0.0005546806,0.00063952646,0.00020284456,0.0000028665331,0.000066250934,0.12220983],"genre_scores_gemma":[0.99813765,0.000007894962,0.0015723358,0.000037021073,0.000037969003,0.000010148022,0.0000011134756,0.0000040222935,0.00019184963],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997043,0.000004940111,0.00009970788,0.000056825236,0.00007984138,0.000054393186],"domain_scores_gemma":[0.9998537,0.000010210113,0.000016711365,0.00002976745,0.00007897115,0.000010665311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000039213013,0.000048730533,0.000051623672,0.00003708682,0.000011952301,0.00001628923,0.00008262985,0.000030480254,0.00040473524],"category_scores_gemma":[0.0000048822753,0.000035425983,0.0000133623125,0.00014395072,0.000026052792,0.000055522865,0.000007079958,0.00009052405,0.000007037606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040237335,0.00019157388,0.06160342,0.000033188375,0.0001459615,0.0000055403243,0.00511727,0.030275228,0.2265222,0.48850122,0.043121535,0.14408049],"study_design_scores_gemma":[0.0017585047,0.00019957192,0.12337389,0.0005398067,0.00001616314,0.00004417418,0.0008893959,0.7051872,0.14985403,0.012351854,0.005304474,0.00048095686],"about_ca_topic_score_codex":0.0000010864223,"about_ca_topic_score_gemma":0.0000027749138,"teacher_disagreement_score":0.674912,"about_ca_system_score_codex":0.00002665854,"about_ca_system_score_gemma":0.000010274941,"threshold_uncertainty_score":0.4431567},"labels":[],"label_agreement":null},{"id":"W2525860097","doi":"10.1139/cjce-2015-0001","title":"Building information modeling utilization for optimizing milling quantity and hot mix asphalt pavement overlay quality","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Overlay; Asphalt pavement; Slab; Asphalt; Visualization; Quality (philosophy); Engineering; Civil engineering; Computer science; Structural engineering; Materials science; Mechanical engineering; Composite material","score_opus":0.0263410954656055,"score_gpt":0.2314885274591873,"score_spread":0.2051474319935818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2525860097","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13745682,0.0006610556,0.86100227,0.000043815042,0.00064855156,0.00009947443,0.000015357815,0.000031395248,0.000041266532],"genre_scores_gemma":[0.9889406,0.000111804366,0.010780635,0.000016184666,0.00012361228,0.000007001284,0.0000020545422,0.00001630711,0.0000018333453],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912906,0.000008208616,0.0004761427,0.000061738174,0.000107024905,0.00021780726],"domain_scores_gemma":[0.9993918,0.000050131595,0.00008993046,0.000058969923,0.00018828474,0.00022088729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036223396,0.00012061373,0.00015855585,0.0003210029,0.000080399586,0.0000848771,0.00006871083,0.000075186574,0.000018160406],"category_scores_gemma":[0.00012583518,0.00010754135,0.00005940588,0.00009957556,0.000011307164,0.0009321733,0.0000034882087,0.00009789385,5.3469245e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006299221,0.0000010683656,0.00028665992,0.00014299779,0.000047026788,8.510113e-7,0.000312256,0.9569922,0.014057057,0.009898661,0.00007824758,0.018176682],"study_design_scores_gemma":[0.00060365006,0.000037488833,0.00031110272,0.00044538,0.000026903672,0.000036555626,0.00018324582,0.988421,0.0049452656,0.00034644385,0.004402012,0.00024091602],"about_ca_topic_score_codex":0.00021905785,"about_ca_topic_score_gemma":0.0055680363,"teacher_disagreement_score":0.85148376,"about_ca_system_score_codex":0.00022076456,"about_ca_system_score_gemma":0.00009602875,"threshold_uncertainty_score":0.4385409},"labels":[],"label_agreement":null},{"id":"W2531194942","doi":"10.1016/j.rser.2016.12.061","title":"Application of nD BIM Integrated Knowledge-based Building Management System (BIM-IKBMS) for inspecting post-construction energy efficiency","year":2017,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Construction engineering; Efficient energy use; Architectural engineering; Engineering; Systems engineering; Computer science; Manufacturing engineering; Operations management","score_opus":0.007858286542553961,"score_gpt":0.22844925319257448,"score_spread":0.2205909666500205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531194942","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007741845,0.013325883,0.9699352,0.000025357684,0.00034046045,0.000482257,0.000006356894,0.00018735978,0.007955295],"genre_scores_gemma":[0.9871407,0.0027398027,0.008247984,0.000013896084,0.00014845512,0.00061024417,0.000045394405,0.00004122656,0.0010122726],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856806,0.000051740324,0.00058752444,0.00032986508,0.000100266254,0.00036251813],"domain_scores_gemma":[0.99871546,0.000037903108,0.00032183508,0.00049731677,0.0003516835,0.00007581474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004522018,0.0002546378,0.00044799555,0.00028420048,0.0006205365,0.00013979485,0.00022522648,0.00013469813,0.000004192112],"category_scores_gemma":[0.000052916323,0.00022946166,0.00012626166,0.0002884303,0.000083712526,0.0002865013,0.000045624212,0.00006539321,7.0331623e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002874655,0.000028145423,0.00012451604,0.0034766414,0.000053725787,0.000001847733,0.00003060258,0.024688007,0.002400068,0.52302986,0.00017773439,0.4459601],"study_design_scores_gemma":[0.0010439045,0.000111636306,0.000054007196,0.00092794036,0.0001762252,0.000028573486,0.0027790999,0.301028,0.030174486,0.0026872098,0.6604732,0.0005156849],"about_ca_topic_score_codex":0.0017110303,"about_ca_topic_score_gemma":0.00020367983,"teacher_disagreement_score":0.9793989,"about_ca_system_score_codex":0.00024659457,"about_ca_system_score_gemma":0.00005807068,"threshold_uncertainty_score":0.93571746},"labels":[],"label_agreement":null},{"id":"W2531535670","doi":"10.5539/mas.v11n1p48","title":"The Importance and Use of Risk Management in Various Stages of Construction Projects Life Cycle (PLC)","year":2016,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk analysis (engineering); Process (computing); Risk management; Business; Product life-cycle management; Balance (ability); Construction management; Process management; Order (exchange); Risk management plan; Operations management; Computer science; IT risk management; Engineering; Marketing; Civil engineering; Finance","score_opus":0.00972740312757443,"score_gpt":0.2021196966113639,"score_spread":0.19239229348378947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531535670","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9011691,0.00006647955,0.09687522,0.000014729082,0.00008516103,0.00015970466,0.000005752222,0.000027349499,0.00159649],"genre_scores_gemma":[0.99561924,0.00028872484,0.0040568174,0.000003414505,0.00000459165,0.000016584063,9.67642e-8,0.0000034649865,0.0000070494716],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994473,0.0000056300464,0.00016658807,0.00012322573,0.00015222425,0.000105038336],"domain_scores_gemma":[0.99970305,0.000040934996,0.00006174067,0.00014507609,0.000025680984,0.000023522623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018926949,0.00005243905,0.000066102846,0.000074098585,0.000059607293,0.000021646823,0.00008623167,0.000019467972,0.000002104154],"category_scores_gemma":[0.000019041137,0.000032530254,0.000007839621,0.00020537458,0.0004305291,0.00014424145,0.000023918048,0.00003857399,5.158399e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028599818,0.000012540078,0.03973616,0.0000360322,0.000014220869,3.8271588e-7,0.0007648141,0.002768015,0.106429175,0.1467061,0.000013527436,0.70349044],"study_design_scores_gemma":[0.0018429348,0.00005320916,0.35742757,0.0001432052,0.00004076701,0.000013947032,0.0019871728,0.40310675,0.10900222,0.1253033,0.0005508727,0.000528075],"about_ca_topic_score_codex":0.00001494416,"about_ca_topic_score_gemma":0.000066845176,"teacher_disagreement_score":0.70296234,"about_ca_system_score_codex":0.00002638556,"about_ca_system_score_gemma":0.000020297342,"threshold_uncertainty_score":0.15863024},"labels":[],"label_agreement":null},{"id":"W2548384983","doi":"","title":"VRML AS AN EFFECTIVE CONSTRUCTION COMMUNICATION TECHNIQUE","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"VRML; Computer science; Software; Virtual reality; Order (exchange); Multimedia; Software engineering; Human–computer interaction; Operating system","score_opus":0.00553185541560938,"score_gpt":0.21010346879746108,"score_spread":0.2045716133818517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548384983","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5721831,0.00009930816,0.25036392,0.00004374048,0.0003102249,0.00050174777,0.0000021898222,0.001516916,0.17497891],"genre_scores_gemma":[0.9854809,0.0000829523,0.014119236,0.000022568014,0.00002727881,0.00013630622,0.00001442182,0.000010725515,0.00010560651],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996624,0.00003355964,0.000102335594,0.00007467981,0.000059337846,0.00006770784],"domain_scores_gemma":[0.9996849,0.000016851594,0.000014513133,0.00019799372,0.000052303734,0.000033470467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004875976,0.00007179865,0.000063290776,0.00006390809,0.00010793625,0.000011599808,0.00006173217,0.00008280159,0.0002026837],"category_scores_gemma":[0.000006563511,0.00006968528,0.000022341543,0.0001110053,0.00008331855,0.00026525563,0.0000058864584,0.0001222818,0.00007079704],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030019402,0.00005422792,0.0044138436,0.000030833115,0.000066232584,0.0000037624816,0.001012256,0.0010725872,0.081427075,0.3336047,0.0018722905,0.5764122],"study_design_scores_gemma":[0.00081840047,0.00026965424,0.015982099,0.00005691259,0.00002951722,0.0031422381,0.0012425922,0.029623376,0.89444643,0.036607098,0.017029487,0.00075217575],"about_ca_topic_score_codex":0.000060653932,"about_ca_topic_score_gemma":0.000018582852,"teacher_disagreement_score":0.8130194,"about_ca_system_score_codex":0.000047339046,"about_ca_system_score_gemma":0.000008017612,"threshold_uncertainty_score":0.28416833},"labels":[],"label_agreement":null},{"id":"W2550094450","doi":"","title":"De nouvelles plateformes pour améliorer la gestion de l'information sur le chantier","year":2016,"lang":"fr","type":"article","venue":"Espace École de technologie supérieure (École de technologie supérieure)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Mitacs","keywords":"Political science; Humanities; Art","score_opus":0.008816959619368481,"score_gpt":0.21157764424663042,"score_spread":0.20276068462726193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550094450","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49484232,0.003318249,0.4323893,0.05207132,0.0014245702,0.0015169878,0.00036658696,0.011469613,0.002601055],"genre_scores_gemma":[0.9623823,0.0037557231,0.024206476,0.00046406692,0.00029377796,0.00079263013,0.000057738205,0.00023657859,0.0078106634],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.993938,0.00023375385,0.0012481922,0.0010194984,0.000626134,0.0029343676],"domain_scores_gemma":[0.9961245,0.00065775897,0.0005597955,0.0017230364,0.00053282315,0.00040208013],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["metaepi_narrow","research_integrity"],"category_scores_codex":[0.0014745306,0.0013504942,0.0010073463,0.0017386117,0.0005732516,0.0005186998,0.0018537497,0.005933601,0.0003122624],"category_scores_gemma":[0.003777034,0.001253473,0.0005037952,0.0020989433,0.0014215232,0.0021968589,0.0005532894,0.0028464883,0.0005858549],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043656756,0.0006551241,0.047050618,0.0008555577,0.0006507866,0.0005806278,0.0024578096,0.042349625,0.12214664,0.1613254,0.0948724,0.52661884],"study_design_scores_gemma":[0.0058049504,0.0009725025,0.018978361,0.0023120816,0.00046491754,0.0036218064,0.028809385,0.10949007,0.4157924,0.040413745,0.3694195,0.003920283],"about_ca_topic_score_codex":0.0009269185,"about_ca_topic_score_gemma":0.0008888752,"teacher_disagreement_score":0.5226986,"about_ca_system_score_codex":0.0024305738,"about_ca_system_score_gemma":0.0023127545,"threshold_uncertainty_score":0.9999246},"labels":[],"label_agreement":null},{"id":"W2550258110","doi":"10.1139/tcsme-2013-0037","title":"AN EXPERIMENTAL STUDY ON THE CONNECTION OF CROSSBEAMS IN A MODULAR BRIDGE","year":2013,"lang":"en","type":"article","venue":"Transactions of the Canadian Society for Mechanical Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Bridge (graph theory); Structural engineering; Engineering; Computer science","score_opus":0.013298508714501141,"score_gpt":0.21641391997070594,"score_spread":0.2031154112562048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550258110","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94284046,0.000021257893,0.055940103,0.00010495736,0.00035521478,0.00065092277,0.00002668652,0.000039381986,0.000021016882],"genre_scores_gemma":[0.9993906,0.0000011508854,0.0003403691,0.000021215868,0.000017469933,0.0002030937,0.0000012842572,0.00001797801,0.000006835343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994788,0.000009648649,0.00019061561,0.000087527085,0.00009225907,0.0001411554],"domain_scores_gemma":[0.9996488,0.000036518195,0.000018276267,0.00020104177,0.000034268327,0.00006109109],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001115425,0.00009085367,0.00010763444,0.0000410298,0.00009173839,0.0000173963,0.00014523912,0.000076659424,0.00004672527],"category_scores_gemma":[0.0000066788352,0.000069922055,0.00018432483,0.00019085383,0.000023935547,0.000099850746,0.0000012626077,0.00016780816,7.475948e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073835836,0.00018294463,0.000044484823,0.000047994836,0.00016652019,9.1250904e-8,0.0026584326,0.7025716,0.28194684,0.010453045,0.00009675171,0.0018239449],"study_design_scores_gemma":[0.00049325195,0.00023869607,0.0019960122,0.000036190646,0.000027173262,0.0000027226338,0.0034148686,0.7956075,0.19774349,0.00020196314,0.00008774435,0.00015035819],"about_ca_topic_score_codex":0.010047548,"about_ca_topic_score_gemma":0.009339534,"teacher_disagreement_score":0.093035944,"about_ca_system_score_codex":0.00019093108,"about_ca_system_score_gemma":0.000030562034,"threshold_uncertainty_score":0.99654466},"labels":[],"label_agreement":null},{"id":"W2550273880","doi":"10.1139/cjce-2014-0296","title":"Benchmark Alberta’s architectural, engineering, and construction industry knowledge of building information modelling (BIM)","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Integrated project delivery; Benchmark (surveying); Globe; Construction industry; Building industry; Project management; Engineering management; Construction engineering; Engineering; Business; Systems engineering; Operations management","score_opus":0.005163455256950599,"score_gpt":0.1649396795862343,"score_spread":0.15977622432928368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550273880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.542346,0.00087355333,0.45432347,0.00006124302,0.0013382874,0.0000683515,0.00001326958,0.000034851208,0.00094097026],"genre_scores_gemma":[0.996228,0.000044980992,0.003549834,0.000003262544,0.00014410088,0.0000021448875,0.0000011084958,0.0000180009,0.000008601014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991702,0.0000064195924,0.00046222983,0.000059355843,0.00008052385,0.00022129815],"domain_scores_gemma":[0.99931467,0.00007132905,0.00010017594,0.0000856567,0.00013621696,0.00029197356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012320056,0.00015540018,0.00019880444,0.00066792086,0.000032911463,0.00003857306,0.00009540743,0.0001756372,0.00007073293],"category_scores_gemma":[0.0000849316,0.00013497201,0.00005977396,0.0001902564,0.000040437862,0.00064247876,0.000005571767,0.00032401737,0.0000011441899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004565398,0.0000015681007,0.0010690998,0.00018112143,0.00009399974,0.000002247045,0.00066522736,0.9495572,0.0052489713,0.012554489,0.00015068798,0.030470815],"study_design_scores_gemma":[0.0012879488,0.000115376126,0.002081313,0.0023021938,0.000096418524,0.001990172,0.00027909141,0.9381409,0.014224225,0.00089452293,0.037797358,0.00079045945],"about_ca_topic_score_codex":0.00029079552,"about_ca_topic_score_gemma":0.0033145898,"teacher_disagreement_score":0.45388195,"about_ca_system_score_codex":0.00014466181,"about_ca_system_score_gemma":0.00014563893,"threshold_uncertainty_score":0.5503999},"labels":[],"label_agreement":null},{"id":"W2550837389","doi":"10.1002/9781119163404.app5a","title":"Synchro <scp>HARBORcenter</scp> Case Study","year":2016,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Synchro; Citation; Computer science; Library science; Engineering","score_opus":0.006846567101724657,"score_gpt":0.21924064554589237,"score_spread":0.21239407844416772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550837389","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008111508,0.0003346449,0.00566336,0.0000029685182,0.0016690401,0.0002771533,0.000024852938,0.001249628,0.9899672],"genre_scores_gemma":[0.04593738,0.00005854932,0.00013635858,0.00001689868,0.0005599051,0.000045858353,0.0000044249955,0.00031762396,0.952923],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999436,0.000014354059,0.00014196459,0.00016213144,0.000098341545,0.0001472129],"domain_scores_gemma":[0.99964035,0.000019992052,0.000029555118,0.00024018827,0.000015195202,0.00005469511],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000026915142,0.00020410398,0.00016426317,0.0001666303,0.000019789817,0.000031816286,0.00007584719,0.0001709627,0.0068093305],"category_scores_gemma":[0.000005125669,0.00014893083,0.000048142938,0.000051523923,0.000018531871,0.000034487886,0.00001261891,0.00011644791,0.0013827061],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.2897848e-7,0.000019552659,0.00017580259,0.000029172412,0.00015577191,0.00028632555,0.00007366992,0.000002053397,0.000023548819,0.00050234183,0.98639613,0.012335498],"study_design_scores_gemma":[0.00030261578,0.000023614884,0.000008425354,0.00006165968,0.000047049656,0.0005652904,0.0011402353,0.0001716823,0.000068501,0.000014096063,0.9975072,0.000089629204],"about_ca_topic_score_codex":0.00022581978,"about_ca_topic_score_gemma":0.0007877843,"teacher_disagreement_score":0.04512623,"about_ca_system_score_codex":0.00003247541,"about_ca_system_score_gemma":0.00000984776,"threshold_uncertainty_score":0.99939483},"labels":[],"label_agreement":null},{"id":"W2559373721","doi":"10.1016/j.proeng.2016.11.591","title":"Comparing Time and Quantity Scales for Relationship and Float Calculations","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Scale (ratio); Schedule; Point (geometry); Work (physics); Margin (machine learning); Computer science; Probabilistic logic; Industrial engineering; Section (typography); Mathematics; Engineering; Statistics; Geometry; Mechanical engineering; Physics","score_opus":0.015951286683706933,"score_gpt":0.20380093731705715,"score_spread":0.1878496506333502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2559373721","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78521687,0.00042030078,0.21350282,0.00006471204,0.00014655257,0.00013561634,0.000009782543,0.00033436634,0.00016901309],"genre_scores_gemma":[0.9941021,0.000024652792,0.0056874594,0.0000021620779,0.000078396006,0.000038677714,0.0000039774295,0.000016778155,0.00004576875],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996429,0.0000019259887,0.00011190986,0.00009595791,0.00003977247,0.00010753725],"domain_scores_gemma":[0.99974895,0.00011557559,0.000010153617,0.000049758797,0.000026487418,0.00004907997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005251339,0.000083403495,0.00008524787,0.0000706684,0.00005522794,0.000027458791,0.0000220999,0.00004946578,0.0000039792008],"category_scores_gemma":[0.00008309252,0.00007059434,0.000015504833,0.000059843653,0.000018732862,0.00019855586,0.000008036161,0.000044466487,0.0000059545055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002701628,0.000020156776,0.45259175,0.0010922063,0.00015150096,8.906755e-7,0.0007616596,0.057248455,0.18912314,0.2455269,0.00074415474,0.052712176],"study_design_scores_gemma":[0.00044401703,0.0000122470265,0.123492084,0.00011057991,0.000022277183,0.000022817316,0.000011826501,0.8704066,0.0030797343,0.00075176475,0.0013953388,0.0002506945],"about_ca_topic_score_codex":0.0000015176904,"about_ca_topic_score_gemma":0.000011133916,"teacher_disagreement_score":0.81315815,"about_ca_system_score_codex":0.00002234769,"about_ca_system_score_gemma":0.0000037081686,"threshold_uncertainty_score":0.28787535},"labels":[],"label_agreement":null},{"id":"W2563258340","doi":"","title":"TRA-901: OPTIMIZING THE LOCATION OF ROAD WEATHER INFORMATION SYSTEMS (RWIS) STATIONS – A SAMPLING DESIGN OPTIMIZATION APPROACH","year":2016,"lang":"en","type":"article","venue":"Scholarship@Western (Western University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Minnesota Department of Transportation; U.S. Department of Transportation","keywords":"Computer science; Sampling (signal processing); Telecommunications","score_opus":0.0715822363726277,"score_gpt":0.2553466699988335,"score_spread":0.1837644336262058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2563258340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1539118,0.000088459914,0.84475183,0.0000407359,0.00025840302,0.0003880381,0.000017067723,0.0002200469,0.0003236494],"genre_scores_gemma":[0.99482596,0.000094355535,0.0046094772,0.000016568789,0.000046476136,0.000010292588,0.000031566142,0.000026567146,0.00033875654],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9988388,0.00016139408,0.00035833148,0.00016872458,0.0002595563,0.00021320059],"domain_scores_gemma":[0.998959,0.00008995568,0.00019223316,0.00030550896,0.00038309238,0.000070230555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032730337,0.00019737941,0.00017705827,0.00037886537,0.00018618177,0.00017844509,0.00029525565,0.00015775804,0.000009110746],"category_scores_gemma":[0.000034205936,0.00015274633,0.000057383124,0.0006282702,0.0000788901,0.0030992602,0.000029849576,0.0001788655,0.000022628055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003878266,0.000019185436,0.01254617,0.000103518236,0.00007497601,5.341098e-7,0.0009286782,0.97880816,0.0010939339,0.0010632222,0.0000011381844,0.0053217164],"study_design_scores_gemma":[0.021730434,0.0010790677,0.58272743,0.0082540475,0.0024237563,0.00062966195,0.047437385,0.27694166,0.041136377,0.0007335563,0.008950684,0.007955954],"about_ca_topic_score_codex":0.000004352047,"about_ca_topic_score_gemma":0.000017739969,"teacher_disagreement_score":0.84091413,"about_ca_system_score_codex":0.00022400408,"about_ca_system_score_gemma":0.000067343106,"threshold_uncertainty_score":0.6228815},"labels":[],"label_agreement":null},{"id":"W2565304470","doi":"10.1108/ohi-01-2016-b0011","title":"The Dry Construction Systems on the Rehabilitation of Built Heritage","year":2016,"lang":"en","type":"article","venue":"Open House International","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Context (archaeology); Quality (philosophy); Architectural engineering; Work (physics); Process (computing); Engineering; Economic shortage; Production (economics); Factory (object-oriented programming); Civil engineering; Computer science; Economics; Geography; Mechanical engineering; Government (linguistics)","score_opus":0.011710797556409264,"score_gpt":0.23156203457388497,"score_spread":0.2198512370174757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565304470","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8596659,0.00017535307,0.017868476,0.012433298,0.012337898,0.0012344124,0.00011660552,0.00039051237,0.095777564],"genre_scores_gemma":[0.9987344,0.000049377733,0.0002729023,0.000018733668,0.0001171347,0.00009259144,0.0000015745122,0.000015697686,0.00069757144],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936754,0.000046324385,0.00023367412,0.000089586334,0.00019335323,0.00006955293],"domain_scores_gemma":[0.9991437,0.00044655462,0.00007024765,0.00019513466,0.00012910881,0.000015254448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024609713,0.00007001033,0.000063900785,0.000035447116,0.000091182344,0.00012494714,0.00036701988,0.000038613056,0.00011224324],"category_scores_gemma":[0.000121985526,0.000033609165,0.000037003618,0.00005982434,0.00012461474,0.0002394137,0.000030021414,0.000063073654,0.000061915],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066726054,0.000018131796,0.0030544777,0.0000083771065,0.000109284396,3.5335796e-7,0.00019180824,0.000866483,0.009510867,0.8860823,0.010097728,0.089993484],"study_design_scores_gemma":[0.0035506845,0.0005417832,0.039300583,0.0013246257,0.000057485562,0.000102494036,0.009471765,0.034736272,0.05338154,0.05071828,0.80586743,0.00094704446],"about_ca_topic_score_codex":0.000057493886,"about_ca_topic_score_gemma":0.00005503697,"teacher_disagreement_score":0.835364,"about_ca_system_score_codex":0.00008217955,"about_ca_system_score_gemma":0.00001681359,"threshold_uncertainty_score":0.1370542},"labels":[],"label_agreement":null},{"id":"W2565347129","doi":"10.1016/j.enbuild.2016.12.030","title":"An integrated simulation and optimization approach for reducing CO 2 emissions from on-site construction process in cold regions","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Northern Alberta Institute of Technology; University of Alberta","funders":"","keywords":"Greenhouse gas; Process (computing); Crew; Volume (thermodynamics); Genetic algorithm; Engineering; Discrete event simulation; Environmental science; Environmental economics; Computer science; Simulation; Economics","score_opus":0.009395779470427457,"score_gpt":0.2310339135814912,"score_spread":0.22163813411106373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565347129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32706475,0.000032699027,0.67247045,0.000035539775,0.00006691457,0.00006732474,0.000019629815,0.00008686427,0.00015581331],"genre_scores_gemma":[0.9705932,0.00007047497,0.029078035,0.000018962834,0.00006626777,0.000042506705,0.00008365692,0.000014556427,0.00003235093],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994871,0.000016126769,0.00015167147,0.00019983086,0.00005087141,0.00009442628],"domain_scores_gemma":[0.999727,0.00006463811,0.000037072386,0.00007048568,0.00004844913,0.000052371837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005080647,0.00010365294,0.00009790068,0.00012376509,0.000098926204,0.00003882958,0.000027292665,0.0001195983,0.000010293476],"category_scores_gemma":[0.000023674747,0.00008015415,0.000012905622,0.00012460444,0.00004982277,0.00030431928,0.0000026286953,0.000049482445,7.5212576e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004552444,0.000014775447,0.0005681223,0.000010948642,0.000009351664,1.2524734e-7,0.00022563609,0.93714327,0.016615313,0.010604522,0.000056970475,0.034705475],"study_design_scores_gemma":[0.0005591154,0.000041279214,0.0000805322,0.00012035908,0.00001032858,0.0000037560892,0.00026454157,0.9809808,0.015895791,0.0007222986,0.0011790292,0.00014217955],"about_ca_topic_score_codex":0.000045405905,"about_ca_topic_score_gemma":0.000010807952,"teacher_disagreement_score":0.64352846,"about_ca_system_score_codex":0.000037002806,"about_ca_system_score_gemma":0.00001223132,"threshold_uncertainty_score":0.32685915},"labels":[],"label_agreement":null},{"id":"W2565626477","doi":"10.1139/cjce-2011-0486","title":"Performance de la conception intégrée et intégration des technologies de l’information dans un contexte de travail multidisciplinaire: une étude exploratoire","year":2016,"lang":"fr","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"","keywords":"Humanities; Sociology; Political science; Library science; Philosophy; Computer science","score_opus":0.005752845379904197,"score_gpt":0.19052169185706858,"score_spread":0.18476884647716438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565626477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52941275,0.0016503027,0.4673734,0.0006246442,0.0004897509,0.00006619629,0.000017425218,0.00008553301,0.00027997623],"genre_scores_gemma":[0.99255335,0.0023755592,0.0048227403,0.000016369384,0.00014865783,0.000018392951,0.0000038152953,0.000033518434,0.000027619133],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986755,0.00007605097,0.00053353584,0.00009012624,0.00012995636,0.0004948185],"domain_scores_gemma":[0.9990667,0.00009644671,0.00017786089,0.00013354325,0.00020915213,0.0003163044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075174356,0.00024229827,0.00022124588,0.00038799844,0.00017507731,0.00014319815,0.00020415855,0.00034597804,0.00005414834],"category_scores_gemma":[0.00031616905,0.00022787043,0.000097572265,0.00034592097,0.00031823086,0.0020464777,0.0000098753,0.00049353513,0.000010524618],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018699895,0.00001035058,0.01770567,0.00025278225,0.000112147995,0.00003437898,0.021645615,0.22057107,0.032178532,0.0052469457,0.00039741144,0.7018264],"study_design_scores_gemma":[0.0034381752,0.00053100486,0.4629525,0.008542587,0.00027131606,0.0043042493,0.024536831,0.38798928,0.08985274,0.003942581,0.012177604,0.0014611111],"about_ca_topic_score_codex":0.0010967834,"about_ca_topic_score_gemma":0.048835237,"teacher_disagreement_score":0.7003653,"about_ca_system_score_codex":0.0018555301,"about_ca_system_score_gemma":0.0007688745,"threshold_uncertainty_score":0.96852106},"labels":[],"label_agreement":null},{"id":"W2566200771","doi":"","title":"Proceedings of the 3rd ISPIM Innovation Symposium, Quebec City (Canada)","year":2010,"lang":"en","type":"article","venue":"University of Groningen research database (University of Groningen / Centre for Information Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Regional science; Political science; Geography","score_opus":0.009377677039245129,"score_gpt":0.1910542774848882,"score_spread":0.18167660044564307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2566200771","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98803926,0.000016392234,0.0044387863,0.001227493,0.00019999838,0.00057862024,0.0005084456,0.00011586554,0.0048751333],"genre_scores_gemma":[0.99427366,0.000044877812,0.0049988218,0.0000050934896,0.000012568323,2.9266153e-7,0.0001613228,0.000007794094,0.00049557234],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99884874,0.000011612794,0.00023335208,0.0001448853,0.00047320395,0.0002882203],"domain_scores_gemma":[0.99771905,0.00004607026,0.00028953422,0.00028356767,0.0016103722,0.00005140854],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042193627,0.00012405973,0.00019789905,0.0009303328,0.00043810712,0.0000139050135,0.0007978623,0.00023447599,0.00012922144],"category_scores_gemma":[0.00012813952,0.00014578049,0.000069266236,0.0016026256,0.00069570186,0.0014287832,0.00026649394,0.0005487932,0.000003174061],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045843492,0.00013341545,0.022638055,0.0015814689,0.00048478198,0.0000023247594,0.00611916,0.0005606493,0.14399095,0.7127966,0.055522252,0.055711906],"study_design_scores_gemma":[0.0043440815,0.0002663058,0.016422804,0.00059483375,0.00022968903,0.000017545062,0.110417016,0.033501137,0.16849737,0.0013436603,0.6634938,0.0008717421],"about_ca_topic_score_codex":0.028994575,"about_ca_topic_score_gemma":0.16800025,"teacher_disagreement_score":0.71145296,"about_ca_system_score_codex":0.00026145473,"about_ca_system_score_gemma":0.00041478177,"threshold_uncertainty_score":0.9774714},"labels":[],"label_agreement":null},{"id":"W2567106578","doi":"","title":"STR-999: INTELLIGENT MONITORING SYSTEM REVEALS NEW INFORMATION ABOUT THE CHAMPLAIN BRIDGE","year":2016,"lang":"en","type":"article","venue":"Scholarship@Western (Western University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Computer science; Forensic engineering; Engineering","score_opus":0.06440425078136475,"score_gpt":0.26983076977481496,"score_spread":0.2054265189934502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2567106578","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93886715,0.00012885936,0.05818435,0.00012898455,0.0013114201,0.0002618987,0.00002807611,0.0005321017,0.0005571285],"genre_scores_gemma":[0.99755156,0.00011426829,0.000031270243,0.000029557872,0.0002850868,0.0000025897016,0.000007399788,0.00002468199,0.0019535853],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987648,0.00009282352,0.0003314171,0.00019244336,0.0002870423,0.00033144667],"domain_scores_gemma":[0.9990722,0.00007260452,0.0001223037,0.00042456773,0.00012400559,0.00018435107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023662008,0.00024820992,0.00019056449,0.00029722814,0.0002155768,0.00026881168,0.00048229555,0.00017172693,0.000019489193],"category_scores_gemma":[0.000021085472,0.00018629794,0.000104400846,0.00032846816,0.00005414866,0.0026198013,0.00008529901,0.00030605195,0.0005031169],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005121552,0.000010419419,0.8845503,0.00015228498,0.00013385659,0.000020600894,0.0014727332,0.000296634,0.0025720885,0.0033445419,0.000014360163,0.10738101],"study_design_scores_gemma":[0.0007693128,0.000048306127,0.9643116,0.0009744263,0.00006648758,0.0000953924,0.00139599,0.0000056759945,0.010584546,0.000129612,0.02114179,0.00047688695],"about_ca_topic_score_codex":0.000013879361,"about_ca_topic_score_gemma":0.00022029916,"teacher_disagreement_score":0.10690412,"about_ca_system_score_codex":0.0005095019,"about_ca_system_score_gemma":0.000055270088,"threshold_uncertainty_score":0.75970095},"labels":[],"label_agreement":null},{"id":"W2573050985","doi":"10.1609/socs.v7i1.18385","title":"A Multi-Phase Search Approach to the LEGO Construction Problem","year":2021,"lang":"en","type":"article","venue":"Proceedings of the International Symposium on Combinatorial Search","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Heuristics; Component (thermodynamics); Computer science; Construct (python library); Search problem; Task (project management); Search algorithm; Connected component; Brick; Selection (genetic algorithm); Beam search; Local search (optimization); Phase (matter); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics; Engineering","score_opus":0.017194737550558642,"score_gpt":0.2538083237308843,"score_spread":0.23661358618032566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2573050985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8616078,0.00006447339,0.0021205891,0.010587361,0.0124450475,0.0012300264,0.00006703187,0.0002494783,0.11162818],"genre_scores_gemma":[0.99582523,0.000024953268,0.002887042,0.00007578567,0.00059007143,0.000089284105,0.000008730012,0.000026972155,0.00047192693],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99834156,0.000019785033,0.00030758226,0.00026427011,0.0008451737,0.00022160959],"domain_scores_gemma":[0.99873674,0.000044467448,0.000047646707,0.00014135471,0.0009524523,0.000077321754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038141382,0.00015398403,0.00014339635,0.00008776582,0.00018342082,0.00020510357,0.00067651604,0.000096084594,0.00003846665],"category_scores_gemma":[0.000061694845,0.00010813869,0.000115524985,0.0005032268,0.00010120823,0.00017510197,0.00017440158,0.00044047157,0.000025905974],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001838957,0.0004839248,0.0009088602,0.00011007361,0.00019653437,5.257352e-7,0.0012459481,0.0037850682,0.33601412,0.6471147,0.0038660683,0.0060903025],"study_design_scores_gemma":[0.0035743865,0.00021634449,0.0005305423,0.00021420445,0.00004231443,0.00018489662,0.0020483285,0.060872797,0.89348364,0.004601321,0.033815376,0.0004158234],"about_ca_topic_score_codex":0.00003720151,"about_ca_topic_score_gemma":0.000002936708,"teacher_disagreement_score":0.64251333,"about_ca_system_score_codex":0.00022387595,"about_ca_system_score_gemma":0.00006813393,"threshold_uncertainty_score":0.44097677},"labels":[],"label_agreement":null},{"id":"W2573273784","doi":"","title":"Innovative Design, Traffic Management and Construction of Concrete Overlay Technology: A Canadian Municipal Application","year":2016,"lang":"en","type":"article","venue":"Transportation Research Board 95th Annual Meeting","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Overlay; Transport engineering; Construction engineering; Engineering; Computer science; Civil engineering","score_opus":0.016469053633928695,"score_gpt":0.26480497986613133,"score_spread":0.24833592623220263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2573273784","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9835357,0.00016395847,0.014108781,0.0003385036,0.00008027328,0.00055456115,0.00009743943,0.00016537403,0.0009554317],"genre_scores_gemma":[0.98912394,0.00020435732,0.010426776,0.0000060915418,0.000021864822,0.00014470577,0.000015940199,0.000018028022,0.00003829522],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9988064,0.000059505768,0.00034404325,0.00021349061,0.00026891337,0.00030762106],"domain_scores_gemma":[0.99910736,0.00008621357,0.000056293302,0.00014011185,0.0005049925,0.00010504499],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004473529,0.00011808928,0.00014221302,0.00075205025,0.00013284602,0.000015028396,0.000100130725,0.00013601822,0.000022583848],"category_scores_gemma":[0.000029736588,0.00010347136,0.000019398865,0.0010048104,0.0003366427,0.00021219182,0.0000035558728,0.00018568114,0.0000068966838],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020673872,0.000011405642,0.029957367,0.00039658652,0.00026551544,0.0000126553405,0.0046397587,0.0025991357,0.04104915,0.16454798,0.0006202887,0.75569344],"study_design_scores_gemma":[0.013920731,0.001985316,0.42959923,0.0041740397,0.00033133253,0.00005286821,0.13533837,0.07100171,0.22739854,0.024348997,0.088047475,0.003801401],"about_ca_topic_score_codex":0.003220932,"about_ca_topic_score_gemma":0.012108522,"teacher_disagreement_score":0.75189203,"about_ca_system_score_codex":0.00010722038,"about_ca_system_score_gemma":0.000060975304,"threshold_uncertainty_score":0.6756839},"labels":[],"label_agreement":null},{"id":"W2574160338","doi":"10.7492/ijaec.2016.013","title":"Functional Units based Model for Construction Organizations Performance","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Process management; Computer science; Knowledge management","score_opus":0.005417452169990675,"score_gpt":0.1712415511934854,"score_spread":0.1658240990234947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2574160338","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1797002,0.00005217182,0.8174932,0.00035967035,0.0021777614,0.000057271773,0.000034615357,0.00008092403,0.000044183704],"genre_scores_gemma":[0.94982165,0.000076375334,0.049524505,0.000021807728,0.0004762181,0.0000084919275,0.0000096505,0.000022751343,0.000038548285],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926406,0.00000714376,0.00031989792,0.00009618417,0.00020254297,0.00011016987],"domain_scores_gemma":[0.9989256,0.00007888743,0.00009878993,0.000058790607,0.0007727603,0.00006517274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008498385,0.0001344509,0.00012166204,0.00035702004,0.000053616066,0.000038868864,0.00008996184,0.0000803003,0.000030248044],"category_scores_gemma":[0.00010230567,0.00010420397,0.000039822367,0.00017293883,0.00007083901,0.00024731003,0.0000073199258,0.0001288709,0.0000010618131],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007190514,0.0000060371203,0.00066413364,0.000030107367,0.00011398088,6.998388e-7,0.00006705336,0.6437203,0.037821673,0.007821641,0.00014754468,0.3095349],"study_design_scores_gemma":[0.0020831015,0.000111807916,0.0012296721,0.00026174184,0.000060634084,0.0017925729,0.00005986632,0.9421252,0.04148994,0.0022791983,0.008176388,0.00032988453],"about_ca_topic_score_codex":4.0114347e-7,"about_ca_topic_score_gemma":0.0000016178235,"teacher_disagreement_score":0.77012146,"about_ca_system_score_codex":0.00008424145,"about_ca_system_score_gemma":0.00008585974,"threshold_uncertainty_score":0.4249315},"labels":[],"label_agreement":null},{"id":"W2575656890","doi":"10.5555/3042094.3042502","title":"A prototype for simulating the kinematics of crane rigging oscillatory motion using Simphony.NET","year":2016,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Kinematics; Computer science; Virtual prototyping; Automation; Motion (physics); Simulation; Perspective (graphical); Double pendulum; Work (physics); Scope (computer science); Equations of motion; Motion control; Pendulum; Control engineering; Inverted pendulum; Engineering; Mechanical engineering; Artificial intelligence; Programming language","score_opus":0.03841010037464632,"score_gpt":0.27195150130117324,"score_spread":0.23354140092652692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575656890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22598161,0.000014546652,0.7727657,0.000047503516,0.00029072646,0.0004794508,0.000012147146,0.00009036681,0.00031797716],"genre_scores_gemma":[0.99707043,0.0000016773831,0.0027239355,0.000015599526,0.00010399556,0.000028393679,0.0000032727726,0.000018267398,0.000034449848],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921703,0.000028133489,0.0003648422,0.00012510334,0.00013292083,0.00013198692],"domain_scores_gemma":[0.999116,0.00027827252,0.00011503899,0.00018528622,0.0002800738,0.000025322588],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015221669,0.00012151253,0.00014020778,0.00007102294,0.000074052696,0.000032085765,0.000094237905,0.0000693388,0.00010507342],"category_scores_gemma":[0.000112168076,0.00007752974,0.00006198911,0.00009747768,0.000056936875,0.00021529869,0.000012938728,0.000055324886,0.0000043869577],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031178624,0.000007409406,0.001024305,0.00012187398,0.000029913635,7.923551e-8,0.00052548305,0.8982797,0.035669785,0.0032248262,0.000011952397,0.061073497],"study_design_scores_gemma":[0.0003689597,0.000028136945,0.0004832264,0.00020737914,0.000019080138,0.0000013921506,0.00007091967,0.99065834,0.0058276774,0.0018005341,0.00042696364,0.0001074073],"about_ca_topic_score_codex":0.000003610129,"about_ca_topic_score_gemma":0.0000068293234,"teacher_disagreement_score":0.7710888,"about_ca_system_score_codex":0.000051229214,"about_ca_system_score_gemma":0.000023530838,"threshold_uncertainty_score":0.3161571},"labels":[],"label_agreement":null},{"id":"W2579284964","doi":"10.5555/3042094.3042501","title":"Heavy lift analysis at feed stage for industrial project","year":2016,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Modular design; Automation; Lift (data mining); Prefabrication; Project planning; Engineering; Project management; Systems engineering; Computer science; Construction engineering; Civil engineering","score_opus":0.06340274180476257,"score_gpt":0.283105620664349,"score_spread":0.21970287885958645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2579284964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20959464,0.000008898798,0.78713185,0.00014602354,0.00054660306,0.00030952247,0.0001022457,0.00022881497,0.0019314032],"genre_scores_gemma":[0.996061,0.0000025154045,0.00028294208,0.000020359095,0.00015462215,0.000044628967,0.000032322605,0.000011601525,0.003389983],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934036,0.00002023045,0.00023348964,0.00016971091,0.00010053075,0.00013565399],"domain_scores_gemma":[0.9995009,0.000116966345,0.000046826397,0.00016060263,0.00013888383,0.000035859925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006974381,0.000113902766,0.00014722477,0.0001815163,0.00005183845,0.000048554903,0.00007686822,0.00010489855,0.0006887947],"category_scores_gemma":[0.00004615855,0.00008440916,0.00010418758,0.00021497623,0.000027638456,0.00019454636,0.000013477126,0.000049260463,0.000033368415],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011019937,0.000076121265,0.07521306,0.000100994745,0.0022246877,0.0000019606973,0.002201258,0.28405976,0.026709847,0.021356346,0.0076268245,0.57932717],"study_design_scores_gemma":[0.0015552266,0.000071797185,0.003476307,0.00005033316,0.00016962634,6.959031e-7,0.0000833672,0.8928164,0.010411702,0.0002544271,0.09077913,0.00033095267],"about_ca_topic_score_codex":0.00001002193,"about_ca_topic_score_gemma":0.0001268974,"teacher_disagreement_score":0.7868489,"about_ca_system_score_codex":0.0000898205,"about_ca_system_score_gemma":0.000028584851,"threshold_uncertainty_score":0.7541819},"labels":[],"label_agreement":null},{"id":"W2581170436","doi":"10.18260/1-2--21021","title":"BIMing Construction Engineering Curricula","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"AUG Signals (Canada)","funders":"","keywords":"Software engineering; Building information modeling; Software; Construction management; Engineering; Engineering management; Suite; Curriculum; Computer science; Construction engineering; Scheduling (production processes); Civil engineering; Operations management","score_opus":0.007012835131492153,"score_gpt":0.16595389797483054,"score_spread":0.1589410628433384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2581170436","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14572218,0.00023581876,0.8189981,0.00044283996,0.0013100667,0.00010275452,0.0000028041952,0.0024601251,0.030725311],"genre_scores_gemma":[0.98927826,0.000011615239,0.010427854,0.00007499896,0.00017395351,0.0000051693155,0.000002620123,0.000011268358,0.000014272749],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997035,0.000001966124,0.00009558762,0.00006798942,0.00005241857,0.00007853401],"domain_scores_gemma":[0.9998781,0.0000055939886,0.000006311143,0.00003912274,0.000015033158,0.0000558462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000010758297,0.00006566128,0.00005551346,0.000028232604,0.00001806452,0.000021216134,0.000031321997,0.000035588713,0.00024123714],"category_scores_gemma":[0.000008586814,0.00006365346,0.000025978,0.00014074666,0.00000951344,0.000111266585,0.000004531785,0.0000803751,0.000078459234],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006049128,0.0000067012834,0.0025935874,0.00016926973,0.00008303702,0.000009397202,0.00056561985,0.16955024,0.121400945,0.23131964,0.008975843,0.46531966],"study_design_scores_gemma":[0.00016279005,0.0000124718335,0.00030021972,0.000014126995,0.000009987706,0.00005427546,0.00022059177,0.9391553,0.028682422,0.000100267534,0.031081239,0.00020633063],"about_ca_topic_score_codex":0.0000012161084,"about_ca_topic_score_gemma":3.2372776e-7,"teacher_disagreement_score":0.84355605,"about_ca_system_score_codex":0.000013179813,"about_ca_system_score_gemma":0.0000028291392,"threshold_uncertainty_score":0.26413774},"labels":[],"label_agreement":null},{"id":"W2583128632","doi":"","title":"Editorial - Technology Strategies for Collaborative Working","year":2010,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interoperability; Context (archaeology); Productivity; Workforce; Business; Information and Communications Technology; Knowledge management; Best practice; Engineering; Process management; Engineering management; Management; Political science; Economic growth; Computer science; Economics","score_opus":0.003260751857332548,"score_gpt":0.21704751225111155,"score_spread":0.213786760393779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2583128632","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006010565,0.00021811877,0.03938207,0.00020313555,0.9582873,0.00032743783,0.00006743692,0.00026924445,0.00064418465],"genre_scores_gemma":[0.007277311,0.0005581005,0.028175645,0.000004535572,0.96376383,0.00008676988,0.00009360448,0.000034326295,0.000005887137],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977237,0.000016218179,0.0014643512,0.00011153144,0.00042600976,0.00025816893],"domain_scores_gemma":[0.9962322,0.00017562683,0.0012005501,0.00020090486,0.0021549973,0.000035733476],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0004264796,0.0003040752,0.0005586302,0.0032428526,0.00010114883,0.00017425756,0.0003819235,0.0044490793,0.000013630184],"category_scores_gemma":[0.00080298434,0.0003052424,0.0001067079,0.0013792663,0.0003552439,0.0016214697,0.000024475243,0.0032461574,0.000006607041],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000096345975,0.000008106761,0.00004525178,0.000087823995,0.00009402374,8.3073667e-7,0.00013997211,0.000524332,0.00046949537,0.024103327,0.843502,0.1309285],"study_design_scores_gemma":[0.0012002825,0.00017253216,9.2897665e-7,0.00022492453,0.00004564003,0.00009197215,0.0048505487,0.0002752601,0.0022393386,0.052545935,0.93809897,0.00025369594],"about_ca_topic_score_codex":0.000001838422,"about_ca_topic_score_gemma":0.000035748177,"teacher_disagreement_score":0.1306748,"about_ca_system_score_codex":0.00035378634,"about_ca_system_score_gemma":0.0009707928,"threshold_uncertainty_score":0.99994},"labels":[],"label_agreement":null},{"id":"W2585603905","doi":"10.5430/jms.v8n1p1","title":"Impact Analysis of Complexity Drivers in the Supply Chain of Prefabricated Houses","year":2017,"lang":"en","type":"article","venue":"Journal of Management and Strategy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Status quo; Supply chain; Modular design; Production (economics); Order (exchange); Business; Exploit; Prefabrication; Supply chain management; Industrial organization; Value (mathematics); Operations management; Risk analysis (engineering); Engineering; Computer science; Marketing; Civil engineering; Economics; Economic growth","score_opus":0.030101478397203934,"score_gpt":0.2690674120083419,"score_spread":0.23896593361113797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2585603905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99590635,0.000090191104,0.0005785139,0.000036125202,0.000032164982,0.000040237304,0.000004968693,0.0000024034462,0.0033090336],"genre_scores_gemma":[0.9996329,0.0002551089,0.0000837328,0.000001907152,0.000008741643,4.014305e-7,0.0000011057028,0.0000017860079,0.000014334515],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99957746,0.00001514441,0.00022183008,0.000029705534,0.00010614514,0.000049712868],"domain_scores_gemma":[0.9996515,0.000011290523,0.0001878148,0.0001009416,0.000035173103,0.000013295032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001808819,0.000047362708,0.00015826132,0.00022174067,0.000028057035,0.000032647895,0.00013726986,0.000017662394,0.000028702747],"category_scores_gemma":[0.0000031706556,0.000030149977,0.000078515106,0.00012600128,0.000059204973,0.00011904577,0.000007716261,0.00006162773,8.8820705e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012522329,0.0001294073,0.84904754,0.00015912639,0.0042751166,0.00002518342,0.0013156716,0.046991087,0.0011137517,0.026758268,0.0009683534,0.06909126],"study_design_scores_gemma":[0.0002480172,0.00006275681,0.9896909,0.000015525537,0.00024397898,0.000002308456,0.0007402166,0.0081633115,0.00010619073,0.0006638916,0.00003348187,0.000029419341],"about_ca_topic_score_codex":0.00006767658,"about_ca_topic_score_gemma":0.00010514789,"teacher_disagreement_score":0.14064334,"about_ca_system_score_codex":0.000010795416,"about_ca_system_score_gemma":0.000004168172,"threshold_uncertainty_score":0.122948036},"labels":[],"label_agreement":null},{"id":"W2586320347","doi":"10.4018/ij3dim.2016070102","title":"A Comparative Analysis of the Complexities of Building Information Model(ling) Guides to Support Standardization","year":2016,"lang":"en","type":"article","venue":"International Journal of 3-D Information Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Public Works and Government Services Canada","funders":"","keywords":"Standardization; Scope (computer science); Leverage (statistics); Computer science; Process (computing); Building information modeling; Knowledge management; Context (archaeology); Process management; Engineering management; Data science; World Wide Web; Engineering; Compatibility (geochemistry)","score_opus":0.024272861912765547,"score_gpt":0.28059501771770506,"score_spread":0.2563221558049395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2586320347","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20828347,0.000007687902,0.78990537,0.00013883947,0.00039741938,0.00006609509,0.0001431553,0.000013653913,0.0010443388],"genre_scores_gemma":[0.98928523,0.000023175764,0.0105515495,0.00007095968,0.000038988048,0.0000028008137,0.000020402875,0.0000029748737,0.0000039345086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978766,0.000018224679,0.0013292205,0.00003177243,0.00066429697,0.00007990357],"domain_scores_gemma":[0.9967617,0.00004249198,0.00063204876,0.000098130804,0.0024284392,0.0000371909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003586007,0.00009748276,0.00025139513,0.0009783198,0.00003705887,0.00005578259,0.00029608686,0.000047466772,0.000047124617],"category_scores_gemma":[0.0001107024,0.00006457972,0.0001818987,0.0003822117,0.00003714455,0.0028888127,0.00003362372,0.00007660636,0.000001997652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048685662,0.000003890012,0.00018569248,0.00001090156,0.00039082486,2.5097876e-8,0.002855952,0.9715357,0.0022687702,0.01470136,0.00016941437,0.007828829],"study_design_scores_gemma":[0.00032652565,0.00002963882,0.00015937956,0.00013084796,0.00010197298,0.0000069219905,0.0008033479,0.98308265,0.013301223,0.0013464822,0.0006363563,0.000074628595],"about_ca_topic_score_codex":0.000010883063,"about_ca_topic_score_gemma":0.000008689604,"teacher_disagreement_score":0.78100175,"about_ca_system_score_codex":0.00017514214,"about_ca_system_score_gemma":0.000098855184,"threshold_uncertainty_score":0.26334843},"labels":[],"label_agreement":null},{"id":"W2586320484","doi":"10.22260/isarc2013/0035","title":"BIM for Facility Management: Design for Maintainability with BIM Tools","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maintainability; Facility management; Building information modeling; Software; Systems engineering; Computer science; Engineering management; Engineering; Software engineering; Operations management; Business; Operating system","score_opus":0.016923488167238484,"score_gpt":0.19768131257478844,"score_spread":0.18075782440754995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2586320484","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58062005,0.000050059185,0.40421665,0.0009824499,0.00033145424,0.00596327,0.00007830827,0.00032142803,0.007436351],"genre_scores_gemma":[0.9687729,0.000004084074,0.029841783,0.000026499656,0.00003169062,0.0010523178,0.0000021142619,0.000013340535,0.00025529924],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993799,0.00000217647,0.00017987876,0.00015025285,0.000103928236,0.00018390208],"domain_scores_gemma":[0.9994849,0.000046378675,0.00005221335,0.00009504193,0.00029168982,0.000029779048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020976996,0.000115587805,0.00012357027,0.000040060328,0.00008332567,0.000065826236,0.00019381028,0.000050181923,0.00002761486],"category_scores_gemma":[0.000051220813,0.00007702955,0.00007592563,0.00013073841,0.000074375246,0.0003043925,0.00002195527,0.00005933658,0.00000402225],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054011174,0.00015368783,0.010466245,0.00632489,0.0005513245,6.4863876e-8,0.0010637718,0.0023627565,0.026072806,0.5996201,0.02763808,0.3252062],"study_design_scores_gemma":[0.0031908012,0.0006109496,0.02164417,0.00027061635,0.00030245518,0.000016920361,0.0074239224,0.05107982,0.2744894,0.6095863,0.030413644,0.00097099686],"about_ca_topic_score_codex":0.0000075836897,"about_ca_topic_score_gemma":0.0000010298147,"teacher_disagreement_score":0.38815284,"about_ca_system_score_codex":0.000063442276,"about_ca_system_score_gemma":0.000007695589,"threshold_uncertainty_score":0.3141174},"labels":[],"label_agreement":null},{"id":"W2589032174","doi":"10.1109/nafips.2016.7851610","title":"Overview of fuzzy simulation techniques in construction engineering and management","year":2016,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Fuzzy logic; Systems engineering; Construction engineering; Engineering; Artificial intelligence","score_opus":0.011327619986843456,"score_gpt":0.22511272574249858,"score_spread":0.21378510575565512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2589032174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4647174,0.0007385268,0.5030994,0.000089718655,0.00038040936,0.00041769916,0.0000043786704,0.0006914549,0.029861076],"genre_scores_gemma":[0.9902004,0.00063100684,0.009114317,0.0000027876133,0.000009969957,0.000009641919,3.6488848e-7,0.000004810799,0.000026675763],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997442,0.000002935672,0.00012117062,0.000049750015,0.000037270063,0.000044675613],"domain_scores_gemma":[0.99990785,0.000013314722,0.000010559737,0.00004733265,0.0000112367,0.0000096956455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003491386,0.000044764885,0.000054904256,0.00010764671,0.0000040546183,0.0000037078005,0.000014278408,0.000030078605,0.000025678622],"category_scores_gemma":[0.0000024415801,0.000033727774,0.000009417775,0.00007658266,0.000011884047,0.00010651919,0.0000053092513,0.000017229006,0.000001174534],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028489078,0.000003030792,0.002139314,0.00017016676,0.000011894712,4.2185047e-7,0.000019106497,0.0035474207,0.0137894675,0.13095762,0.00001633636,0.84934235],"study_design_scores_gemma":[0.0026364515,0.00013074261,0.109408006,0.0029093712,0.00007329888,0.00007837082,0.00041038689,0.39753717,0.42584848,0.024459,0.03528522,0.0012234941],"about_ca_topic_score_codex":0.000002931485,"about_ca_topic_score_gemma":0.000005003945,"teacher_disagreement_score":0.8481189,"about_ca_system_score_codex":0.000021888864,"about_ca_system_score_gemma":9.0827746e-7,"threshold_uncertainty_score":0.13753788},"labels":[],"label_agreement":null},{"id":"W2590775636","doi":"10.1061/(asce)cp.1943-5487.0000660","title":"Automated Schedule and Progress Updating of IFC-Based 4D BIMs","year":2017,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Computer science; Schedule; Exploit; Field (mathematics); Task (project management); Hierarchy; Systems engineering; Data mining; Scheduling (production processes); Engineering","score_opus":0.007272320727445325,"score_gpt":0.23239998591886832,"score_spread":0.225127665191423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2590775636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9548091,0.0003709574,0.043836847,0.000031440675,0.0005506913,0.000041282132,6.290308e-7,0.00011975087,0.00023924749],"genre_scores_gemma":[0.97798556,0.000006460906,0.021894248,0.0000022258394,0.000092728245,5.4182203e-7,3.5477004e-7,0.000017331307,5.463734e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920636,0.000009218145,0.00044887437,0.00006114474,0.00013634081,0.00013803357],"domain_scores_gemma":[0.99944603,0.000053416472,0.00024615508,0.00012219156,0.00008687191,0.000045353583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003275637,0.00010637369,0.00022443947,0.00022469304,0.00006296567,0.000097524455,0.00014986277,0.00006320107,0.0000039433626],"category_scores_gemma":[0.00009888323,0.00010461595,0.00004507212,0.000085113614,0.000043150383,0.00019073188,0.000021873993,0.0002477982,2.2411749e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054326156,0.000014410959,0.028653188,0.0002506383,0.000037979684,0.000011120515,0.00015705074,0.95366544,0.0064156326,0.00081702525,0.000018867207,0.009953246],"study_design_scores_gemma":[0.00044585697,0.000027986966,0.039475046,0.0007119181,0.000008422979,0.000048173464,0.000035161647,0.95229125,0.0067941835,0.000015551745,0.000052715193,0.00009371266],"about_ca_topic_score_codex":0.0000030041315,"about_ca_topic_score_gemma":0.0000068873064,"teacher_disagreement_score":0.02317641,"about_ca_system_score_codex":0.00003748243,"about_ca_system_score_gemma":0.000028500584,"threshold_uncertainty_score":0.42661145},"labels":[],"label_agreement":null},{"id":"W2591926082","doi":"10.4028/www.scientific.net/aef.21.102","title":"Case Study on Modeling Fire Action Complexity in Fire Safety Engineering of Structures","year":2017,"lang":"en","type":"article","venue":"Advanced engineering forum","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fire safety; Fire protection engineering; Fire protection; Action (physics); Restructuring; Engineering; Modular design; Architectural engineering; Field (mathematics); Construction engineering; Civil engineering; Risk analysis (engineering); Business; Computer science","score_opus":0.03461258873090577,"score_gpt":0.27190254257617397,"score_spread":0.2372899538452682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2591926082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9586629,0.00008740525,0.03960488,0.000020427588,0.0009633049,0.00025126728,0.000014649188,0.00026853135,0.00012659247],"genre_scores_gemma":[0.9973585,0.00002356888,0.0024779164,0.0000022915501,0.000051633157,0.00003013385,0.0000056157432,0.000044841952,0.0000054970387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990254,0.00000605294,0.00034944314,0.00020117227,0.0001394832,0.000278427],"domain_scores_gemma":[0.9993725,0.000028121858,0.00005704593,0.0004508038,0.000035494897,0.000056073946],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006111024,0.00023708762,0.00026386126,0.00011675571,0.00013167509,0.00003716125,0.00016235703,0.00009289058,0.000008129339],"category_scores_gemma":[0.000056426074,0.00025765988,0.00006180964,0.000097083444,0.000017792425,0.0003952039,0.00003218337,0.00032360127,0.0000015813622],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016290427,0.0000185031,0.00051297346,0.00006256506,0.000026339874,0.000069966874,0.00019817647,0.97514117,0.0016967267,0.00089884136,0.0000023745108,0.021356076],"study_design_scores_gemma":[0.0005981946,0.000064734166,0.0026607474,0.000090166424,0.000009485892,0.00018043464,0.0009435969,0.99329764,0.0017015528,0.00015634336,0.00005298146,0.00024414496],"about_ca_topic_score_codex":0.00013945358,"about_ca_topic_score_gemma":0.00016097467,"teacher_disagreement_score":0.03869556,"about_ca_system_score_codex":0.00013142858,"about_ca_system_score_gemma":0.000007665813,"threshold_uncertainty_score":0.99998754},"labels":[],"label_agreement":null},{"id":"W2591945424","doi":"10.1139/cjce-2016-0401","title":"Optimizing profit and logistics for precast concrete production","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Profit (economics); Production (economics); Production planning; Decision maker; Computer science; Operations research; Operations management; Business; Engineering; Civil engineering; Economics","score_opus":0.016413656999444384,"score_gpt":0.2009657009332642,"score_spread":0.18455204393381983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2591945424","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18997148,0.0046442463,0.7864778,0.00083489035,0.011992639,0.0005377277,0.000048303325,0.000118228534,0.005374659],"genre_scores_gemma":[0.99570763,0.000036290006,0.0037580617,0.0000037414075,0.000413065,0.0000049377104,8.9153264e-7,0.00001900168,0.000056356133],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995761,0.0000021735684,0.00017010751,0.000056414985,0.000044867276,0.0001503608],"domain_scores_gemma":[0.9995096,0.000012802387,0.000070072936,0.00010527765,0.000119922996,0.00018236953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012493256,0.000083266816,0.00011522621,0.00012695011,0.00013909755,0.0001361259,0.000092644594,0.00005361674,0.00001100939],"category_scores_gemma":[0.0002263111,0.000086600434,0.000033075143,0.00002229199,0.000037233458,0.0002632581,0.0000028472093,0.00013248996,4.0821698e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023413773,8.42226e-7,0.0049648155,0.0007259021,0.0003081641,0.00004673599,0.0016224282,0.91152614,0.020959405,0.013569893,0.0065793633,0.03967288],"study_design_scores_gemma":[0.0018176812,0.00028304188,0.011221521,0.001368389,0.00025586938,0.002009816,0.000479471,0.853228,0.022950225,0.0011791653,0.10401564,0.0011911908],"about_ca_topic_score_codex":0.000050755527,"about_ca_topic_score_gemma":0.006365621,"teacher_disagreement_score":0.8057362,"about_ca_system_score_codex":0.000070060836,"about_ca_system_score_gemma":0.000084326224,"threshold_uncertainty_score":0.3552166},"labels":[],"label_agreement":null},{"id":"W2601047779","doi":"","title":"Proceedings of the 2013 IEEE 17th International Conference on Computer Supported Cooperative Work in Design","year":2013,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Work (physics); Computer science; Engineering management; Engineering; Mechanical engineering","score_opus":0.02026961814773091,"score_gpt":0.21149251353809712,"score_spread":0.19122289539036622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2601047779","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5779653,0.0001776516,0.29600626,0.010285284,0.0031655836,0.0020108812,0.000066904526,0.0004367332,0.1098854],"genre_scores_gemma":[0.98392916,0.00023921355,0.013618141,0.00003565046,0.00002836158,0.00011832249,0.00005351579,0.000025044274,0.0019526118],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983895,0.00044530877,0.00042386525,0.00031219426,0.00027122954,0.00015790103],"domain_scores_gemma":[0.9972774,0.00020686796,0.00022321737,0.00042731533,0.0018144115,0.000050814433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008965273,0.00022348268,0.00022741646,0.00015343103,0.00006691553,0.00021209709,0.00077541795,0.00021421902,0.00024579707],"category_scores_gemma":[0.00007779601,0.00019045311,0.00008574341,0.00027797162,0.0001573025,0.00012516607,0.00020682812,0.0006143274,0.000026362084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011072319,0.001074132,0.011539711,0.0004719306,0.00059746695,0.0000023471334,0.038125835,0.0554602,0.028590662,0.6248206,0.115058266,0.124148145],"study_design_scores_gemma":[0.0007779011,0.000001260806,0.014446176,0.004792716,0.00003190828,0.0000075713488,0.0002938734,0.79405546,0.177543,0.0049695494,0.002453048,0.000627563],"about_ca_topic_score_codex":0.00020297646,"about_ca_topic_score_gemma":0.00017921234,"teacher_disagreement_score":0.73859525,"about_ca_system_score_codex":0.000115058734,"about_ca_system_score_gemma":0.00009790177,"threshold_uncertainty_score":0.77664524},"labels":[],"label_agreement":null},{"id":"W2602378149","doi":"10.5278/ojs.td.v1i1.5677","title":"Framework for Railway Phase-based Planning","year":2020,"lang":"en","type":"article","venue":"Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Phase (matter); Computer science; Chemistry","score_opus":0.02541469337198768,"score_gpt":0.23454411603484707,"score_spread":0.2091294226628594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2602378149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042503834,0.0002931943,0.942532,0.0014458447,0.00019438521,0.0008054805,0.00024851123,0.0008045781,0.011172149],"genre_scores_gemma":[0.9137899,0.00009774958,0.08562077,0.00011548383,0.00007024038,6.4781807e-7,0.00004625619,0.000045423403,0.00021347821],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99781114,0.000087112305,0.0004589488,0.0006203031,0.000508521,0.0005139518],"domain_scores_gemma":[0.9977993,0.0006227767,0.00029083324,0.0005535722,0.0003095212,0.0004240467],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00027538935,0.00041495037,0.00083098427,0.0003193956,0.00029052357,0.000020884092,0.0011815306,0.0009058502,0.0013045301],"category_scores_gemma":[0.00023699754,0.0005471163,0.0006239162,0.00094633194,0.0007579263,0.00034455687,0.00022630965,0.00094209117,0.00007807269],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.019650506,0.0035088998,0.006123628,0.004312911,0.0022645355,0.0010191926,0.0024166238,0.027002601,0.3687273,0.23744582,0.22678924,0.100738734],"study_design_scores_gemma":[0.046221234,0.008907587,0.01216659,0.0043614325,0.003693484,0.00023095543,0.012281921,0.16261487,0.06646255,0.019953653,0.6548787,0.00822705],"about_ca_topic_score_codex":0.000038610116,"about_ca_topic_score_gemma":0.00005143819,"teacher_disagreement_score":0.8712861,"about_ca_system_score_codex":0.00026383423,"about_ca_system_score_gemma":0.00016167409,"threshold_uncertainty_score":0.99969804},"labels":[],"label_agreement":null},{"id":"W2603912831","doi":"10.1061/9780784480434.004","title":"Automation of Large-Scale Geotextile and Geomembrane Fabrication","year":2017,"lang":"en","type":"article","venue":"Geotechnical Frontiers 2017","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TC Scientific (Canada); DSM (Canada); Greenfield Research (Canada)","funders":"","keywords":"Geomembrane; Geotextile; Fabrication; Scale (ratio); Automation; Scope (computer science); Welding; Engineering; Computer science; Manufacturing engineering; Construction engineering; Mechanical engineering; Geotechnical engineering","score_opus":0.006746331917608263,"score_gpt":0.22270102184652824,"score_spread":0.21595468992891997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2603912831","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34160298,0.0008843565,0.6448161,0.0005612987,0.0016206768,0.00030189287,0.000052347565,0.0004537062,0.009706614],"genre_scores_gemma":[0.99513733,0.00022622838,0.004205187,0.000010003683,0.00006913653,0.0000161253,0.000014295595,0.000010877164,0.0003107949],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941033,0.000008874412,0.00019486445,0.00013405818,0.00011111287,0.00014077549],"domain_scores_gemma":[0.9993306,0.000007216346,0.000098948076,0.00044483662,0.00006574653,0.00005264622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013515075,0.00009295695,0.00015719293,0.00006578222,0.00019561862,0.000054598204,0.00018202415,0.0001567841,0.00003777321],"category_scores_gemma":[0.00006306756,0.00009259324,0.00004304441,0.000030167399,0.00012694461,0.00030363147,0.000036023015,0.00012561362,0.000017482016],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007451993,0.00013226416,0.0060807285,0.00045728756,0.00019130047,0.0000042134516,0.0006214796,0.01134874,0.065225765,0.015933117,0.15562057,0.74431],"study_design_scores_gemma":[0.0008394546,0.000054841497,0.15261792,0.00007653979,0.00006125798,0.000021265807,0.00016791737,0.7760405,0.013140271,0.0077537587,0.0488539,0.00037239384],"about_ca_topic_score_codex":0.000014051607,"about_ca_topic_score_gemma":0.000008402736,"teacher_disagreement_score":0.7646917,"about_ca_system_score_codex":0.000023293791,"about_ca_system_score_gemma":0.0000092005785,"threshold_uncertainty_score":0.37758428},"labels":[],"label_agreement":null},{"id":"W26051266","doi":"10.1039/c5cp01993a","title":"Using 3-D blueprints at a construction site","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science","score_opus":0.013403270543075588,"score_gpt":0.2026513050801605,"score_spread":0.1892480345370849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W26051266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9269503,0.000017936925,0.030980118,0.000016457481,0.00045869683,0.00006860971,8.0939714e-7,0.00026790367,0.041239202],"genre_scores_gemma":[0.98683596,0.000005480008,0.012618935,0.000023938246,0.000051423307,0.0000081118615,0.0000021187707,0.00000815276,0.00044587208],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970746,0.0000043697682,0.000092085356,0.00006476053,0.00004881951,0.00008248894],"domain_scores_gemma":[0.9998456,0.0000043344257,0.000009358088,0.000077246084,0.000031233492,0.000032206197],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000012911782,0.00005672906,0.000046248402,0.00003984587,0.00004180035,0.000027052467,0.000020896417,0.00004403577,0.004008215],"category_scores_gemma":[0.0000020139094,0.000052198127,0.000021472273,0.00006434148,0.000025352536,0.00016376791,0.0000089977475,0.000044213724,0.0011400149],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043643445,0.000009817877,0.04243864,0.000041066458,0.0000652277,0.000001053201,0.000360672,0.01162523,0.6900001,0.030101007,0.005489049,0.21986376],"study_design_scores_gemma":[0.00048754457,0.000011775289,0.017045686,0.000026480051,0.000021696416,0.00037256986,0.00051704334,0.82555175,0.14107649,0.0044694943,0.009959509,0.00045997748],"about_ca_topic_score_codex":0.0000859121,"about_ca_topic_score_gemma":0.000027933012,"teacher_disagreement_score":0.8139265,"about_ca_system_score_codex":0.00006352224,"about_ca_system_score_gemma":0.0000033152526,"threshold_uncertainty_score":0.9996377},"labels":[],"label_agreement":null},{"id":"W2605404504","doi":"10.7712/120113.4701.c1063","title":"A NEW PERFORMANCE-BASED DESIGN METHODOLOGY FOR CONTROLLED ROCKING STEEL FRAMES","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Engineering drawing; Engineering","score_opus":0.04772252239349974,"score_gpt":0.25316429970901716,"score_spread":0.2054417773155174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605404504","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044714212,0.000051119776,0.9903815,0.00007724169,0.00046872775,0.00026097937,3.3792008e-7,0.00026007285,0.004028634],"genre_scores_gemma":[0.5703786,0.0000031237685,0.428646,0.00012719483,0.0001387788,0.0000755576,0.000001700686,0.000012066794,0.0006169891],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954253,0.000049973423,0.0001530374,0.00008169323,0.000045651315,0.00012712805],"domain_scores_gemma":[0.9993302,0.00048975134,0.000021165002,0.00008366461,0.000037953985,0.000037260877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027869505,0.000086181586,0.00018540522,0.00006578318,0.000044336477,0.000022213953,0.000051234,0.000083835905,0.00017682603],"category_scores_gemma":[0.00008049844,0.00006859791,0.000059906462,0.000048609956,0.000007862256,0.000061470724,0.0000020850582,0.00006128045,0.000012603974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037888574,0.0000056863378,0.00026905778,0.000057201232,0.00008155808,5.480514e-8,0.00010661867,0.20069663,0.01296572,0.029222384,0.005500013,0.7507162],"study_design_scores_gemma":[0.0028283282,0.000091056754,0.00009401187,0.000009452906,0.000023393994,0.0000017584144,0.000029480556,0.94774395,0.03891451,0.0015120207,0.008650038,0.00010198006],"about_ca_topic_score_codex":0.00000648768,"about_ca_topic_score_gemma":0.0000072082644,"teacher_disagreement_score":0.7506142,"about_ca_system_score_codex":0.00001720876,"about_ca_system_score_gemma":0.000025554422,"threshold_uncertainty_score":0.27973416},"labels":[],"label_agreement":null},{"id":"W2607494137","doi":"10.1186/s40327-017-0044-3","title":"Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization","year":2017,"lang":"en","type":"article","venue":"Visualization in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Duration (music); Supply chain; Prefabrication; Gantt chart; Scheduling (production processes); Schedule; Modular design; Reservation; Computer science; Engineering; Systems engineering; Manufacturing engineering; Construction engineering; Operations research; Operations management; Civil engineering; Business","score_opus":0.010852543148798388,"score_gpt":0.238328426565875,"score_spread":0.2274758834170766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2607494137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12401432,0.00006715967,0.8724595,0.000048114176,0.0012306292,0.0002495761,0.00000845137,0.0006657609,0.0012565376],"genre_scores_gemma":[0.99187267,0.00006748467,0.0074448357,0.0000122584115,0.0002964792,0.000067582834,0.00013467239,0.00006378258,0.000040251063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897665,0.000017656368,0.00039464555,0.0002153464,0.00016511095,0.00023058457],"domain_scores_gemma":[0.9993949,0.00001690491,0.00010358469,0.00034895816,0.00007612839,0.00005954899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012346324,0.00019444038,0.00017387311,0.00033188373,0.0001743413,0.00029661806,0.00021246275,0.00015882721,0.00012206513],"category_scores_gemma":[0.00014174765,0.00023350838,0.000038537528,0.00021371046,0.000024044371,0.00061584095,0.000031728345,0.00012634546,0.00001674161],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063015436,0.00000784251,0.0020725606,0.00007405458,0.000010753323,0.0000010251918,0.00016272633,0.9804397,0.01175593,0.00352715,0.00005957881,0.0018823302],"study_design_scores_gemma":[0.000290633,0.000010113576,0.0034370355,0.00016395171,0.000009120293,0.000004968398,0.00006835349,0.97408974,0.020421747,0.000026773936,0.0012276223,0.00024993598],"about_ca_topic_score_codex":0.0000143860125,"about_ca_topic_score_gemma":0.0000049420096,"teacher_disagreement_score":0.86785835,"about_ca_system_score_codex":0.00015147323,"about_ca_system_score_gemma":0.000014570941,"threshold_uncertainty_score":0.9522196},"labels":[],"label_agreement":null},{"id":"W2608455727","doi":"10.4224/20377989","title":"PERD 079 Project - Task 4 - Review of work plan and selection of wall assemblies","year":2008,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Task (project management); Selection (genetic algorithm); Work (physics); Plan (archaeology); Computer science; Operations research; Systems engineering; Engineering; Artificial intelligence; Geology; Mechanical engineering","score_opus":0.01767616870318328,"score_gpt":0.22163137260728033,"score_spread":0.20395520390409705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2608455727","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9364666,0.0068478035,0.0014158048,0.00013939556,0.00021111834,0.00033713624,0.000009435368,0.00015935968,0.054413382],"genre_scores_gemma":[0.987648,0.010724543,0.0014725662,0.000018613324,0.000024245412,0.000011054023,0.0000041786175,0.000006007082,0.00009078227],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996938,0.000011027751,0.00013260826,0.000048763755,0.00006687249,0.000046931233],"domain_scores_gemma":[0.9998706,0.0000108126505,0.000028228671,0.000040210194,0.000039964376,0.00001016852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000040579776,0.00004714148,0.00010564831,0.000050210583,0.000017376307,0.000002046674,0.000021694173,0.000031590615,0.0000735233],"category_scores_gemma":[0.000011270135,0.000041686064,0.000020569503,0.00017052452,0.000025099327,0.000052207288,0.0000030532804,0.000052226907,0.0000015776026],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010397207,0.000112132744,0.08256128,0.01897313,0.0003243302,0.000004125065,0.0035459967,0.00017072186,0.39248404,0.011075566,0.21939899,0.27124572],"study_design_scores_gemma":[0.002612316,0.001094191,0.1510026,0.024859853,0.00047719158,0.0013231876,0.00078510464,0.022424255,0.35672972,0.0034036797,0.43332565,0.001962254],"about_ca_topic_score_codex":0.000009823099,"about_ca_topic_score_gemma":0.0000040578375,"teacher_disagreement_score":0.26928347,"about_ca_system_score_codex":0.000009292934,"about_ca_system_score_gemma":0.000014374115,"threshold_uncertainty_score":0.16999084},"labels":[],"label_agreement":null},{"id":"W2610527462","doi":"","title":"Proc. 19th IEEE International Conference on Computer Supported Cooperative Work in Design, CSCWD 2015","year":2015,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Work (physics); Computer science; Engineering; Engineering management; Library science; Mechanical engineering","score_opus":0.03822328292050867,"score_gpt":0.2529316685281148,"score_spread":0.2147083856076061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610527462","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027310852,0.00025471844,0.89959025,0.002997827,0.0023156472,0.00087655504,0.00009372418,0.0005588385,0.06600158],"genre_scores_gemma":[0.96215564,0.0002355981,0.032344278,0.00007351891,0.000087990564,0.00019368077,0.00071722694,0.000056117453,0.004135977],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99688566,0.0014644703,0.000512093,0.0005097895,0.00037547198,0.0002525288],"domain_scores_gemma":[0.99659866,0.0002640681,0.00018558193,0.0007785303,0.002033959,0.00013920601],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0018654732,0.00034157085,0.00032178618,0.0002763039,0.00007926102,0.00035067793,0.00073744013,0.00032559328,0.00029457005],"category_scores_gemma":[0.00015876042,0.00035894493,0.0000816149,0.00032110294,0.00013560215,0.00015465671,0.00021475603,0.0008454066,0.00009588055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038299098,0.001809586,0.004358537,0.00039770486,0.00083458226,0.000053213822,0.044516187,0.21965733,0.0051180013,0.18769434,0.1521695,0.383008],"study_design_scores_gemma":[0.0011990095,0.0000019476086,0.0014261577,0.0029689914,0.0000313007,0.000016274224,0.0002199708,0.95383364,0.024714196,0.0040300274,0.010659044,0.0008994224],"about_ca_topic_score_codex":0.00014201287,"about_ca_topic_score_gemma":0.0006267863,"teacher_disagreement_score":0.93484473,"about_ca_system_score_codex":0.00030883588,"about_ca_system_score_gemma":0.00031426948,"threshold_uncertainty_score":0.9998863},"labels":[],"label_agreement":null},{"id":"W2617402647","doi":"10.4236/ti.2017.82011","title":"Research on Selection of Technological Innovation Mode for Large and Medium-Sized Construction Enterprises in China","year":2017,"lang":"en","type":"article","venue":"Technology and Investment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"China; Selection (genetic algorithm); Mode (computer interface); Industrial organization; Business; Computer science; Political science","score_opus":0.024100001003872884,"score_gpt":0.3098014457884637,"score_spread":0.2857014447845908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2617402647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99477303,0.00007510269,0.00254824,0.00074079423,0.000079826386,0.00026368813,0.000006590136,0.00012802618,0.0013847149],"genre_scores_gemma":[0.9977655,0.00010379206,0.0019533266,0.000014359303,0.000009549681,0.00013174843,0.0000040711216,0.0000050115805,0.000012647979],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9994923,0.000012821961,0.00017235272,0.00013338627,0.00006314268,0.00012603814],"domain_scores_gemma":[0.99972254,0.000019877534,0.00006305129,0.00012583371,0.00005848709,0.000010223867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025484865,0.000069469876,0.00011477961,0.0007864893,0.00017174722,0.000015242978,0.00006662303,0.00026312494,0.0000054972934],"category_scores_gemma":[0.00013874978,0.0000621506,0.0000078305575,0.00026673,0.0004015475,0.000092166476,0.000028783556,0.00024130987,4.7189613e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034041364,0.000023159371,0.013016629,0.000026982098,0.000010786605,1.9148618e-7,0.000023071994,0.000010415781,0.015306053,0.9500364,0.00005209891,0.021460168],"study_design_scores_gemma":[0.001894952,0.0005173506,0.06665609,0.00014093833,0.000010418219,0.000034983495,0.0006748748,0.013299842,0.32674024,0.5875057,0.0023561327,0.00016851863],"about_ca_topic_score_codex":0.0000065836152,"about_ca_topic_score_gemma":0.000029810206,"teacher_disagreement_score":0.36253074,"about_ca_system_score_codex":0.000040881558,"about_ca_system_score_gemma":0.0000135487,"threshold_uncertainty_score":0.2534428},"labels":[],"label_agreement":null},{"id":"W2619168597","doi":"10.1111/cgf.13105","title":"Design Transformations for Rule-based Procedural Modeling","year":2017,"lang":"en","type":"article","venue":"Computer Graphics Forum","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kootenay Association for Science & Technology","funders":"","keywords":"Computer science; Transformation (genetics); Rule-based machine translation; Procedural modeling; Variety (cybernetics); Theoretical computer science; Grammar; Programming language; Algorithm; Artificial intelligence","score_opus":0.027901779223121034,"score_gpt":0.23249221616099958,"score_spread":0.20459043693787854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2619168597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044343234,0.00003966627,0.9935184,0.0005279257,0.00074818125,0.00028347506,0.000010183181,0.00024438716,0.00019346157],"genre_scores_gemma":[0.9553546,0.000008805812,0.044253927,0.00014732698,0.000094882955,0.00009753928,0.000019435582,0.000018211082,0.0000052766736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995012,0.0000048294523,0.00015607257,0.00009285392,0.000067975874,0.00017706153],"domain_scores_gemma":[0.9996268,0.000017058754,0.000026740634,0.00020409944,0.00008476939,0.000040538445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000069035115,0.00010381905,0.00008747637,0.00009427499,0.00046290518,0.00016991835,0.00017999398,0.000073324685,0.0000024941382],"category_scores_gemma":[0.0000033261547,0.00010230604,0.00008593173,0.00003931482,0.000031279797,0.00031351,0.000005850807,0.00009011847,0.0000033276197],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028178009,0.000023337825,0.0002284348,0.00016736385,0.000068931426,4.5535134e-7,0.00022370837,0.77124995,0.0002600082,0.14765666,0.0044404306,0.07565253],"study_design_scores_gemma":[0.00037557763,0.000025427024,0.000039538987,0.000027062548,0.000010997149,0.0000031721518,0.00000949911,0.98291224,0.0009055846,0.014594066,0.00097077293,0.00012606406],"about_ca_topic_score_codex":0.000002390369,"about_ca_topic_score_gemma":0.000010231608,"teacher_disagreement_score":0.9509203,"about_ca_system_score_codex":0.000013311303,"about_ca_system_score_gemma":0.00002326702,"threshold_uncertainty_score":0.41719192},"labels":[],"label_agreement":null},{"id":"W2619588521","doi":"10.34626/33w9-m815","title":"Proposta de uma Estrutura para o Código da Construção em Portugal no Domínio da Higrotérmica","year":2011,"lang":"pt","type":"dissertation","venue":"Open Repository of the University of Porto (University of Porto)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.01377033913553965,"score_gpt":0.19923764818908393,"score_spread":0.18546730905354428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2619588521","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.922679,0.00014841426,0.0011357383,0.00008701388,0.002221089,0.0013588766,0.000255256,0.00008363439,0.072030984],"genre_scores_gemma":[0.93295544,0.00014428892,0.0062583825,0.000008184561,0.00005701052,2.995078e-7,0.00036580072,0.00005589314,0.060154684],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99709743,0.00023473051,0.00074868253,0.0007434584,0.0006988544,0.00047686987],"domain_scores_gemma":[0.9947151,0.0000588822,0.0026052254,0.0012435198,0.0010812143,0.00029606812],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00036646816,0.0006202723,0.0012252025,0.00039423152,0.0009174845,0.00006431046,0.0027999885,0.0008870691,0.0020091624],"category_scores_gemma":[0.00002448739,0.0007545571,0.0008180339,0.000478675,0.0011598326,0.0009725828,0.00058518996,0.00080621487,0.000037005775],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.01942519,0.004147242,0.33593717,0.013134105,0.017331736,0.004172528,0.16554292,0.0014142451,0.2352225,0.06260934,0.04623952,0.09482352],"study_design_scores_gemma":[0.012228519,0.00201151,0.5260447,0.008608091,0.010581516,0.0014736195,0.3462214,0.007687105,0.050921045,0.0010675342,0.027432187,0.005722731],"about_ca_topic_score_codex":0.018925162,"about_ca_topic_score_gemma":0.0012484354,"teacher_disagreement_score":0.1901076,"about_ca_system_score_codex":0.0003657087,"about_ca_system_score_gemma":0.0014622912,"threshold_uncertainty_score":0.99949056},"labels":[],"label_agreement":null},{"id":"W2624855859","doi":"10.1061/9780784480830.031","title":"Planning Rough-Grading Projects: CAT Handbook vs. RS Means","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Grading (engineering); Computer science; Hoist (device); Productivity; Operations research; Industrial engineering; Engineering; Civil engineering","score_opus":0.02366660187588807,"score_gpt":0.24291896015364334,"score_spread":0.21925235827775527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2624855859","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1953188,0.00051489496,0.1580639,0.00031580284,0.00311821,0.00031908258,0.0000058685896,0.0014274274,0.640916],"genre_scores_gemma":[0.9940701,0.000022586151,0.003327561,0.000035245153,0.00017568542,0.000018744158,0.000003283979,0.00001651535,0.0023302871],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957633,0.000004250308,0.00010678933,0.00009927486,0.00007512732,0.0001382146],"domain_scores_gemma":[0.9996887,0.000008792828,0.00002580133,0.00022062934,0.000020364596,0.000035754532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004438542,0.0000905484,0.00008427577,0.000046488512,0.00025362457,0.00017511821,0.00012374208,0.000058455982,0.00009104514],"category_scores_gemma":[0.00001617978,0.000079328216,0.000032232576,0.000022356535,0.000030751293,0.00030737455,0.000012740907,0.0000789074,0.000053371237],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009926846,0.000061621664,0.17002568,0.00049203524,0.0006190298,0.000077438395,0.016052293,0.031321574,0.06687758,0.14029296,0.17338756,0.40069297],"study_design_scores_gemma":[0.0016948254,0.00011067557,0.01514519,0.0007206495,0.0000867035,0.00016502096,0.0025223019,0.6575408,0.16081685,0.0034195886,0.15640911,0.0013682441],"about_ca_topic_score_codex":0.00007603515,"about_ca_topic_score_gemma":0.000058026395,"teacher_disagreement_score":0.7987513,"about_ca_system_score_codex":0.000043925287,"about_ca_system_score_gemma":0.000011974418,"threshold_uncertainty_score":0.3234911},"labels":[],"label_agreement":null},{"id":"W2625069236","doi":"10.19255/jmpm01304","title":"Building Information Modeling (BIM) in Brazil's Architecture, Engineering and Construction (AEC) Industry: A Review and a Bibliometric Study","year":2017,"lang":"en","type":"review","venue":"Swinburne Research Bank (Swinburne University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Building information modeling; Scope (computer science); Interoperability; Architecture; Process (computing); Engineering management; Engineering; Construction industry; Work (physics); Sustainability; Construction engineering; Facility management; Architectural engineering; Process management; Knowledge management; Systems engineering; Computer science; Business; Operations management; World Wide Web","score_opus":0.055250643404401494,"score_gpt":0.3341857389141401,"score_spread":0.2789350955097386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625069236","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053109853,0.98976254,0.0022923993,0.00011244435,0.000110376524,0.0017232463,0.00003104795,0.0002736025,0.00038336447],"genre_scores_gemma":[0.005604127,0.99107504,0.0032056693,0.0000020506284,0.000027536737,0.000017357313,0.000014234295,0.00003209075,0.000021872338],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977853,0.000108368215,0.000673458,0.0004461283,0.00045672318,0.00053007767],"domain_scores_gemma":[0.99855375,0.00011031294,0.00024640607,0.00063661195,0.00031436945,0.00013853991],"candidate_categories":["metaepi_narrow","bibliometrics","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0013342986,0.00043605862,0.0014805574,0.047856566,0.00026985168,0.00011537618,0.0006638539,0.0011393285,0.000031963504],"category_scores_gemma":[0.00057223445,0.0004716958,0.00013092872,0.01872117,0.00041078377,0.00082391495,0.00047046912,0.0034221595,0.0000040621567],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051646007,0.00002169809,0.00015284662,0.010742408,0.00017306613,0.000016974953,0.000049422124,0.00019063413,0.0000023564526,0.00084127526,0.00007634301,0.9877278],"study_design_scores_gemma":[0.0020078484,0.00040140684,0.00017946804,0.05007628,0.0011211014,0.00068983797,0.0016010536,0.011648948,0.000010043039,0.0016245146,0.92930824,0.0013312382],"about_ca_topic_score_codex":0.00021931261,"about_ca_topic_score_gemma":0.00004562113,"teacher_disagreement_score":0.98639655,"about_ca_system_score_codex":0.00031247595,"about_ca_system_score_gemma":0.00019507484,"threshold_uncertainty_score":0.9997735},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"not_applicable","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"design_other","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"split"},{"id":"W2625207554","doi":"10.1061/9780784480823.007","title":"BIM to Facilities Management: Presenting a Proven Workflow for Information Exchange","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Merck Canada Inc. (Canada)","funders":"","keywords":"Workflow; Asset management; Deliverable; Computer science; Asset (computer security); Process management; Building information modeling; Leverage (statistics); Knowledge management; Information system; Data exchange; Information exchange; Engineering management; Systems engineering; Business; Database; Operations management; Scheduling (production processes); Engineering; Computer security; Finance","score_opus":0.014510449497048477,"score_gpt":0.22268896847860895,"score_spread":0.20817851898156048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625207554","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032033633,0.000023749755,0.4351544,0.00037262242,0.0011591767,0.0010962422,0.000036424484,0.00048857194,0.5296352],"genre_scores_gemma":[0.9685307,0.000013724362,0.016452748,0.00005751523,0.00012931453,0.000502783,0.000018615334,0.00000895004,0.014285642],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99970466,0.0000013634233,0.000096755706,0.00004259537,0.00005504458,0.000099582896],"domain_scores_gemma":[0.9997716,0.000004699661,0.0000182501,0.00015182505,0.000030781383,0.000022847255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000045475255,0.00005263788,0.00004296569,0.00006527725,0.00014088207,0.00022609918,0.00008888404,0.000025705209,0.000074116295],"category_scores_gemma":[0.000011974947,0.000049006885,0.000023079132,0.00001848953,0.000007840625,0.0006900275,0.00002242202,0.00002236641,0.00007986338],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071923578,0.0000031074298,0.00028240477,0.00041959935,0.000035314573,1.2026922e-7,0.0009594007,0.00060777314,0.000047771653,0.062549114,0.011171085,0.9239171],"study_design_scores_gemma":[0.0003561519,0.000016169393,0.0036072193,0.000038829006,0.00001054449,0.0000012728864,0.0011545483,0.04347008,0.0020462167,0.0036067844,0.9455036,0.00018859774],"about_ca_topic_score_codex":0.000015923308,"about_ca_topic_score_gemma":0.000036410813,"teacher_disagreement_score":0.9364971,"about_ca_system_score_codex":0.000015715174,"about_ca_system_score_gemma":0.0000015426252,"threshold_uncertainty_score":0.21802796},"labels":[],"label_agreement":null},{"id":"W2626000505","doi":"10.1061/9780784480823.015","title":"3D Model-Based Quantity Take-Off for Construction Estimates","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Component (thermodynamics); Estimator; Industrial engineering; Building information modeling; Data modeling; Estimation; Data mining; Software engineering; Systems engineering; Engineering; Operations management","score_opus":0.022070255942967514,"score_gpt":0.2555505215299778,"score_spread":0.2334802655870103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2626000505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047727652,0.000029058503,0.941912,0.000072891424,0.0007007105,0.00012191265,0.000014142093,0.00030239453,0.009119226],"genre_scores_gemma":[0.7944273,0.0000057775715,0.20533887,0.000018268227,0.000054687705,0.000032206237,0.000009960568,0.000010749656,0.00010219501],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965155,0.0000014720848,0.0001055126,0.000092320915,0.000049571307,0.00009954965],"domain_scores_gemma":[0.9996507,0.000015516913,0.000030481271,0.00021300287,0.00006085056,0.0000294087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000411196,0.000080845835,0.00007987278,0.000027312099,0.00023357969,0.00011482784,0.0000798733,0.000067155925,0.00006453852],"category_scores_gemma":[0.000025315396,0.00007511384,0.00004504869,0.000013893563,0.00007049918,0.00021997925,0.0000043688474,0.000046748188,0.000013728175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000303327,0.000018292663,0.0063001337,0.00014632204,0.000056354736,2.959717e-7,0.000039444356,0.26352206,0.015928868,0.13310711,0.005055508,0.5757953],"study_design_scores_gemma":[0.0002377633,0.000010524495,0.00033460092,0.000008466701,0.000012327061,0.000002704793,0.000014752029,0.9638546,0.031397592,0.0024818229,0.0015494963,0.00009533066],"about_ca_topic_score_codex":0.00001856266,"about_ca_topic_score_gemma":0.000069486945,"teacher_disagreement_score":0.74669963,"about_ca_system_score_codex":0.00002128327,"about_ca_system_score_gemma":0.000018070214,"threshold_uncertainty_score":0.30630535},"labels":[],"label_agreement":null},{"id":"W2626097300","doi":"10.1061/9780784480847.013","title":"Towards Developing an Ontology for Earthwork Operations","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Computer science; Earthworks; Domain (mathematical analysis); Knowledge management; Information exchange; Data exchange; Software engineering; World Wide Web; Engineering; Telecommunications","score_opus":0.03314021745691838,"score_gpt":0.28476674120211415,"score_spread":0.2516265237451958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2626097300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10835816,0.000023265902,0.85267913,0.0007650492,0.0011180008,0.00012177839,0.0000039448773,0.00022296475,0.036707714],"genre_scores_gemma":[0.92407113,0.0000065376157,0.07519853,0.00006475794,0.00012727633,0.000041110903,0.000008011532,0.0000065219324,0.00047611515],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997752,0.0000027414824,0.00006954917,0.000058087706,0.000021477535,0.00007297655],"domain_scores_gemma":[0.9997831,0.0000037234308,0.000005729336,0.00014451577,0.00004192108,0.000020989959],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000031028907,0.000042607455,0.000048296424,0.00001825867,0.0002518445,0.000096817166,0.00007756422,0.000045393623,0.00008372763],"category_scores_gemma":[0.00001632605,0.00003826545,0.0000158822,0.000009613834,0.000017884671,0.00022142826,0.000004794771,0.000029816296,0.000013230341],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028955862,0.0000034359402,0.0005472657,0.000009728318,0.000019542094,2.2373217e-7,0.00020158345,0.0017846992,0.0013223663,0.69187397,0.000874742,0.30335957],"study_design_scores_gemma":[0.0013316663,0.00014304447,0.07178209,0.000047445465,0.000036590187,0.0000590403,0.0009700104,0.5833551,0.06901676,0.028140288,0.2441894,0.00092851545],"about_ca_topic_score_codex":0.000045900608,"about_ca_topic_score_gemma":0.0025183612,"teacher_disagreement_score":0.815713,"about_ca_system_score_codex":0.000013665604,"about_ca_system_score_gemma":0.000021759428,"threshold_uncertainty_score":0.19370097},"labels":[],"label_agreement":null},{"id":"W2641878396","doi":"10.1061/(asce)co.1943-7862.0001364","title":"The University of Alberta’s Hole School of Construction Engineering: 25 Years of Impact and Innovation","year":2017,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Speculation; Relevance (law); Audience measurement; Editorial board; Engineering; Political science; Engineering ethics; Library science; Media studies; Sociology; Management; Law; Economics; Computer science","score_opus":0.004403314453956561,"score_gpt":0.18529836120196835,"score_spread":0.1808950467480118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2641878396","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96476465,0.00031504635,0.0335376,0.000035979774,0.0007020514,0.00008559272,0.0000037964946,0.00001369487,0.0005415557],"genre_scores_gemma":[0.993434,0.0012301673,0.005262565,5.3633454e-7,0.0000306904,3.3742856e-7,6.0922196e-7,0.0000073741317,0.000033688408],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999405,0.0000065101917,0.00033251592,0.00005624337,0.00012366327,0.000076026554],"domain_scores_gemma":[0.99931353,0.000030139045,0.00033494158,0.00013602876,0.00014793042,0.0000374234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017125218,0.00008598297,0.00017724719,0.0003088555,0.000058776786,0.00002516693,0.0000905712,0.000050964143,0.000009512068],"category_scores_gemma":[0.00005045769,0.000080828286,0.00005102001,0.00013727671,0.00013091207,0.00024179921,0.00002357732,0.00011462557,2.1823317e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020860063,0.000039425264,0.020034548,0.0014577542,0.0019986269,0.000012143577,0.0005963403,0.20610484,0.04278899,0.17510602,0.00059241336,0.5510603],"study_design_scores_gemma":[0.005566947,0.00054319226,0.77016914,0.0016434098,0.0007232358,0.0011586357,0.0042192563,0.15726565,0.016699595,0.0012224037,0.040012155,0.0007763674],"about_ca_topic_score_codex":0.000024801946,"about_ca_topic_score_gemma":0.0000035023477,"teacher_disagreement_score":0.7501346,"about_ca_system_score_codex":0.00003361758,"about_ca_system_score_gemma":0.000016024056,"threshold_uncertainty_score":0.3296082},"labels":[],"label_agreement":null},{"id":"W26532961","doi":"","title":"Bringing a construction site into the lab: a context-relevant lab-based evaluation of a multimodal mobile application","year":2006,"lang":"en","type":"book-chapter","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Context (archaeology); Modalities; Stylus; Computer science; Mobile apps; Engineering; Human–computer interaction; Work (physics); Systems engineering; Mobile device; Multimedia; World Wide Web; Mechanical engineering","score_opus":0.007881218495077245,"score_gpt":0.2268628822886017,"score_spread":0.21898166379352446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W26532961","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047108892,0.0034048834,0.18948586,0.00025257314,0.002938697,0.005180652,0.00027113478,0.0011087067,0.7502486],"genre_scores_gemma":[0.9934743,0.00004853059,0.0023895472,0.000030639774,0.0002647011,0.0004040932,0.00023610015,0.000070624534,0.0030814707],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856776,0.000036602636,0.0004772761,0.00025732967,0.0005220558,0.00013900462],"domain_scores_gemma":[0.99885905,0.00007183591,0.00023381025,0.000351162,0.00045087765,0.000033278076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038099603,0.0002670616,0.00026457713,0.0001841087,0.0000937028,0.000034315122,0.00011627519,0.00028312148,0.00036237855],"category_scores_gemma":[0.000015237678,0.00023798074,0.00013805882,0.000074016796,0.00016455677,0.00008376339,0.000015033755,0.000321104,0.00005037656],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026299083,0.000013501304,0.000037928836,0.00012935056,0.00009633686,4.0965236e-7,0.00041386578,0.03433911,0.032812,0.042993713,0.0012993406,0.8878381],"study_design_scores_gemma":[0.00093033456,0.0000426785,0.00007885836,0.00027646852,0.00026707136,0.000013902879,0.000105804385,0.9070806,0.007454032,0.017508967,0.06585278,0.0003885319],"about_ca_topic_score_codex":0.0001541643,"about_ca_topic_score_gemma":0.00026723064,"teacher_disagreement_score":0.9463654,"about_ca_system_score_codex":0.0002739448,"about_ca_system_score_gemma":0.000105382576,"threshold_uncertainty_score":0.9704573},"labels":[],"label_agreement":null},{"id":"W2683943887","doi":"","title":"Fusing 4D modeling and laser scanning for automated construction progress control","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Laser scanning; Computer science; Control (management); Artificial intelligence; Computer vision; Laser; Optics; Physics","score_opus":0.00597748130636891,"score_gpt":0.21757849487057734,"score_spread":0.21160101356420843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2683943887","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62254894,0.000039531682,0.37448648,0.000055650216,0.0007419275,0.00017557389,0.00000468022,0.0010898422,0.000857385],"genre_scores_gemma":[0.9469199,0.0000016607247,0.052884404,0.000016622045,0.00010643705,0.000038146336,0.000003897438,0.000014115577,0.000014817538],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960077,0.000003834381,0.00013365425,0.0000969487,0.000046337238,0.00011848297],"domain_scores_gemma":[0.99979866,0.000014348332,0.000015926022,0.00005851851,0.00007400385,0.000038535745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006316093,0.000081828206,0.0000831889,0.000058376623,0.00011682206,0.00010152038,0.000022554188,0.000084969906,0.00004084707],"category_scores_gemma":[0.000009245762,0.000075775475,0.0000212591,0.00005075623,0.000058024452,0.0001735082,0.0000030868655,0.000100729245,0.0000012915053],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078162426,0.000019202516,0.0069452217,0.00021858005,0.00016938639,0.0000012951108,0.00038257043,0.28899947,0.10166693,0.078973986,0.0006412232,0.521904],"study_design_scores_gemma":[0.00047993325,0.000007496098,0.00006781041,0.000011969675,0.000014763269,0.000037593967,0.00012474284,0.99564743,0.0029419858,0.00030321116,0.00026682013,0.0000962671],"about_ca_topic_score_codex":0.0000059978956,"about_ca_topic_score_gemma":0.000022461796,"teacher_disagreement_score":0.70664793,"about_ca_system_score_codex":0.000009388961,"about_ca_system_score_gemma":0.000011734334,"threshold_uncertainty_score":0.30900344},"labels":[],"label_agreement":null},{"id":"W270424157","doi":"10.17226/23126","title":"Emerging Technologies for Construction Delivery","year":2007,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Computer science; Engineering; Systems engineering; Project management","score_opus":0.030994054816382868,"score_gpt":0.2921208527542026,"score_spread":0.26112679793781973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W270424157","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038709412,0.0015213045,0.104272895,0.00011521004,0.0021899005,0.0029684827,0.00053179846,0.004431634,0.88009787],"genre_scores_gemma":[0.063650966,0.0013162056,0.030759076,0.000051917916,0.001306976,0.0019680553,0.0022084003,0.00061621453,0.8981222],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980308,0.0000169823,0.00052839,0.00035130925,0.0005844165,0.00048812057],"domain_scores_gemma":[0.9988345,0.00015889958,0.00007152156,0.00027989544,0.0005855713,0.00006963426],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037372202,0.00029321725,0.00029568272,0.0009844218,0.0002283483,0.00006705887,0.00021660943,0.00073892897,0.00006906764],"category_scores_gemma":[0.000013073137,0.00032308575,0.00015419931,0.00011404602,0.00044704427,0.000102628066,0.000004133707,0.0009602247,0.000038703787],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009782106,0.000005298073,0.000028964861,0.00073653983,0.00015882202,0.000012034331,0.00032129537,0.00027126135,0.0020158563,0.17813285,0.03291958,0.78529966],"study_design_scores_gemma":[0.000515696,0.00010744943,0.000076550525,0.00028447577,0.00006784826,0.0000031232762,0.0009756066,0.0005852943,0.0153838955,0.058922186,0.9225623,0.00051556726],"about_ca_topic_score_codex":0.000032280983,"about_ca_topic_score_gemma":0.00071182585,"teacher_disagreement_score":0.8896427,"about_ca_system_score_codex":0.00030741695,"about_ca_system_score_gemma":0.00021437823,"threshold_uncertainty_score":0.9999221},"labels":[],"label_agreement":null},{"id":"W2729889382","doi":"10.18260/1-2--11886","title":"Using Computer Simulation To Teach Technical Aspects Of Construction In A Liberal Arts Setting","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Liberal arts education; Curriculum; Session (web analytics); Reading (process); Mathematics education; The arts; Vocational education; Engineering education; Liberal education; Computer science; Engineering ethics; Engineering; Engineering management; Pedagogy; Sociology; Higher education; Psychology; Political science; World Wide Web; Law","score_opus":0.02141888291545729,"score_gpt":0.2523638229465474,"score_spread":0.23094494003109012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2729889382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38344604,0.0000045668917,0.6118821,0.00014698022,0.00013507198,0.00010174717,0.0000013735234,0.00016051233,0.0041216495],"genre_scores_gemma":[0.89894456,2.0293481e-7,0.100858785,0.0000952205,0.00009072611,0.0000017754169,0.0000018663532,0.0000059028976,9.751079e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953413,0.000009894516,0.00020909261,0.000096961376,0.000072295545,0.00007764824],"domain_scores_gemma":[0.99985176,0.000015667507,0.000019065887,0.000046192927,0.000026852356,0.00004046383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000034032237,0.00006363703,0.00009471143,0.00005435823,0.000013151044,0.000013152087,0.000028352857,0.000055980843,0.00003369148],"category_scores_gemma":[0.000011856719,0.000066035864,0.000022555461,0.00025319523,0.000013062912,0.00010422777,0.000011546879,0.000084991814,0.000004619709],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000069965386,0.0000044156463,0.0033329204,0.00002026574,0.0000045838256,8.023041e-7,0.00012352646,0.9333401,0.01902398,0.0072047403,0.000085165586,0.036852542],"study_design_scores_gemma":[0.00014239727,0.000021583179,0.0031961785,0.000025996202,0.00000343553,0.0000113909455,0.000050161583,0.9913516,0.0044422806,0.00058822625,0.000089768546,0.00007697737],"about_ca_topic_score_codex":0.0000057368375,"about_ca_topic_score_gemma":0.000013196073,"teacher_disagreement_score":0.5154985,"about_ca_system_score_codex":0.00005399642,"about_ca_system_score_gemma":0.000010752795,"threshold_uncertainty_score":0.26928645},"labels":[],"label_agreement":null},{"id":"W2731290591","doi":"10.1016/j.aei.2017.06.005","title":"A method for clustering unlabeled BIM objects using entropy and TF-IDF with RDF encoding","year":2017,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Computer science; RDF; Cluster analysis; tf–idf; Information model; Data mining; Entropy (arrow of time); Information retrieval; Database; Artificial intelligence; Engineering; Term (time); Semantic Web","score_opus":0.009529279703391041,"score_gpt":0.24410464314865013,"score_spread":0.2345753634452591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731290591","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08696161,0.00006965448,0.9116619,0.0000066949456,0.00037162908,0.00023661667,0.000007713058,0.00026136375,0.00042281052],"genre_scores_gemma":[0.40633807,0.00004033162,0.5934825,0.000010291714,0.000052298827,0.00003194951,0.0000040929176,0.00003067024,0.000009798306],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999231,0.000002605271,0.00029892955,0.00008525931,0.000102605656,0.0002796311],"domain_scores_gemma":[0.9994458,0.00005452861,0.00010339435,0.00025862333,0.000060303963,0.00007737713],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010154779,0.00021044486,0.00021612886,0.00011742414,0.0002284596,0.00018098528,0.00012542757,0.00007691099,0.0000024885164],"category_scores_gemma":[0.000041081366,0.00019869563,0.000033673896,0.00006526578,0.000023497416,0.0009338107,0.00003261676,0.00014834691,0.000001261826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000154114,0.000002197133,0.00008754475,0.00048329518,0.000059328613,8.836803e-7,0.0007916862,0.9433742,0.013363307,0.0031534308,0.000003082485,0.03866564],"study_design_scores_gemma":[0.0007532079,0.000038541446,0.000093587885,0.00019773409,0.000031654974,0.00006155333,0.00026079454,0.9857146,0.010417604,0.00007532167,0.0020893922,0.0002659783],"about_ca_topic_score_codex":0.0000042561705,"about_ca_topic_score_gemma":0.000007924399,"teacher_disagreement_score":0.31937647,"about_ca_system_score_codex":0.00007847946,"about_ca_system_score_gemma":0.000012977432,"threshold_uncertainty_score":0.81025726},"labels":[],"label_agreement":null},{"id":"W2731633638","doi":"10.4050/f-0073-2017-12087","title":"Integrated Hybrid Structural Management System (IHSMS) - Usage and Loads Monitoring","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lockheed Martin (Canada)","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.009909695440013059,"score_gpt":0.21342762551807856,"score_spread":0.2035179300780655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731633638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92076737,0.0001118296,0.0110094,0.000017106873,0.0020032448,0.00011562988,0.000004774919,0.00045000616,0.065520614],"genre_scores_gemma":[0.9970624,0.000026941178,0.0019979763,0.0000019147014,0.00010179002,0.000010920301,0.0000023630134,0.000011176193,0.0007845467],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956894,0.000005592046,0.00011945794,0.000111449895,0.00007843494,0.000116131676],"domain_scores_gemma":[0.9996781,0.000003887124,0.000024207642,0.00022809254,0.000021506305,0.00004424077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004048443,0.00010532685,0.00008778457,0.000047635902,0.00020510517,0.00024823402,0.00011221359,0.000029618377,0.000036565387],"category_scores_gemma":[0.0000023100172,0.00008679289,0.000020065158,0.000019697827,0.00003265524,0.00024236472,0.000029020242,0.000081915205,0.000018435838],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016579526,0.0000037478842,0.034639306,0.00050940283,0.0002490632,0.000057870748,0.0001668832,0.0005905738,0.0057753064,0.06568004,0.0009825511,0.8913287],"study_design_scores_gemma":[0.002515275,0.00007961069,0.33902526,0.00096852577,0.00020689708,0.0006040063,0.007712025,0.48106807,0.14500755,0.0015644594,0.019579956,0.0016683551],"about_ca_topic_score_codex":0.0000567259,"about_ca_topic_score_gemma":0.000007631894,"teacher_disagreement_score":0.8896603,"about_ca_system_score_codex":0.000056070014,"about_ca_system_score_gemma":0.0000020769269,"threshold_uncertainty_score":0.35393113},"labels":[],"label_agreement":null},{"id":"W2736183088","doi":"10.5539/mas.v11n8p47","title":"An Educational Tool based on Virtual Construction Site Visit Game","year":2017,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Process (computing); SAFER; Quality (philosophy); Domain (mathematical analysis); Active learning (machine learning); Architecture; Human–computer interaction; Engineering management; Multimedia; Engineering; Artificial intelligence","score_opus":0.00807803237893988,"score_gpt":0.23229083759216038,"score_spread":0.22421280521322048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2736183088","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57136625,0.000002734239,0.3933644,0.00014245954,0.0008497631,0.00012355867,0.000010777155,0.0001612562,0.033978824],"genre_scores_gemma":[0.99677324,8.3517034e-7,0.002892555,0.00008497776,0.00015471566,0.000028722841,0.000007174053,0.000009193409,0.00004857781],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999127,0.0000040948853,0.000116491065,0.00026225764,0.00031842204,0.00017173504],"domain_scores_gemma":[0.9993213,0.0000134416305,0.000044767763,0.00048844685,0.000055209865,0.00007687004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015137109,0.00010250734,0.00007077166,0.00011413553,0.00051379565,0.00036782626,0.00032477043,0.000047950132,0.00011399379],"category_scores_gemma":[0.000015952415,0.00010225559,0.000019587556,0.00008950745,0.00043156766,0.0004552317,0.000012864347,0.000114763105,0.00011092964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020690484,0.0000312336,0.0010766916,0.0000053661797,0.0000026708478,2.6340913e-7,0.0002270903,0.06281724,0.593724,0.13517359,0.0000680664,0.20685309],"study_design_scores_gemma":[0.00017323316,0.000021474112,0.015911305,0.0000070427973,0.000002933195,0.0000039543324,0.000027534965,0.96233106,0.016354473,0.004805036,0.00021452222,0.00014742209],"about_ca_topic_score_codex":0.000005230235,"about_ca_topic_score_gemma":0.0000066360644,"teacher_disagreement_score":0.89951384,"about_ca_system_score_codex":0.00009185235,"about_ca_system_score_gemma":0.00011250744,"threshold_uncertainty_score":0.4169862},"labels":[],"label_agreement":null},{"id":"W2740039981","doi":"10.2495/sdp-v13-n1-49-61","title":"The role of BIM for safety and security management","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Security management; Process management; Construction engineering; Risk analysis (engineering); Engineering management; Engineering; Computer science; Computer security","score_opus":0.004418400734150634,"score_gpt":0.21363017138485105,"score_spread":0.2092117706507004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740039981","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9620307,0.0025089558,0.02578756,0.00014929146,0.00074936036,0.00013052783,0.0000026445555,0.000013266524,0.008627707],"genre_scores_gemma":[0.9971104,0.00017275762,0.0024301084,0.000008953792,0.00011806238,0.0000023263099,0.000001576481,0.0000034737475,0.00015229652],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957275,0.0000042845036,0.00020910811,0.000032911565,0.00010655201,0.000074408],"domain_scores_gemma":[0.9994981,0.000041467058,0.000069916074,0.000017817967,0.0003525449,0.00002011983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023442389,0.000044349476,0.000055719192,0.000093123745,0.00009412191,0.00004364321,0.0000698459,0.000018969113,0.00000379724],"category_scores_gemma":[0.000014651886,0.000032896507,0.000012894175,0.000033542008,0.000033558557,0.00011273564,0.000019739904,0.00004345346,1.3340356e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007035559,0.000016515463,0.009574031,0.00013682261,0.0008642982,0.00004975903,0.013017141,0.0003942568,0.00020697783,0.3937864,0.0009800026,0.58027023],"study_design_scores_gemma":[0.0009417566,0.00007226618,0.013057678,0.00017445022,0.000024844128,0.00011564683,0.07469778,0.0050400603,0.009188712,0.035366304,0.8611715,0.00014900367],"about_ca_topic_score_codex":0.0000012149749,"about_ca_topic_score_gemma":0.0000010476396,"teacher_disagreement_score":0.8601915,"about_ca_system_score_codex":0.000036513808,"about_ca_system_score_gemma":0.000019625591,"threshold_uncertainty_score":0.13414806},"labels":[],"label_agreement":null},{"id":"W2740118187","doi":"10.2495/sdp-v13-n1-62-72","title":"Enhancing learning outcomes by introducing BIM in civil engineering studies – experiences from a university college in Norway","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Civil engineering; Engineering management; Engineering ethics; Architectural engineering; Construction engineering","score_opus":0.006388667193519865,"score_gpt":0.2148709632356418,"score_spread":0.20848229604212196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740118187","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99458444,0.00073664397,0.003853715,0.00006153187,0.00058424904,0.00003088373,0.0000014307868,0.000013980058,0.00013314643],"genre_scores_gemma":[0.9978195,0.00005361673,0.001819378,0.00001052433,0.00009455327,0.0000015494186,0.0000022105392,0.0000057673897,0.00019291717],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99929225,0.000016198692,0.00029621247,0.00008844362,0.00015957763,0.0001472834],"domain_scores_gemma":[0.99955773,0.00010581001,0.00007587157,0.000020227488,0.00021108486,0.000029244247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025824332,0.00009469415,0.00015856954,0.0004825195,0.00005590881,0.000029921055,0.00010326037,0.000038825143,0.000021212509],"category_scores_gemma":[0.00013326245,0.00009358099,0.00001545097,0.00017681242,0.000023903856,0.00041579845,0.000034518544,0.00018965475,6.613699e-7],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033208847,0.00006135776,0.47118273,0.00012655045,0.00090638816,0.0027508389,0.4422371,0.055236682,0.0091092475,0.0028388165,0.0011900245,0.014028174],"study_design_scores_gemma":[0.0012388808,0.0000430565,0.05182313,0.00068809575,0.000007990476,0.00003843746,0.9074931,0.008727668,0.011760726,0.00012926983,0.017730122,0.00031951652],"about_ca_topic_score_codex":0.000033158874,"about_ca_topic_score_gemma":0.000090350055,"teacher_disagreement_score":0.465256,"about_ca_system_score_codex":0.0003253428,"about_ca_system_score_gemma":0.00005477901,"threshold_uncertainty_score":0.38161218},"labels":[],"label_agreement":null},{"id":"W2740384963","doi":"","title":"Integration of Data and Processes of AEC Projects Using the Industry Foundation Classes","year":2005,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interoperability; Software deployment; System integration; Systems engineering; Data exchange; Engineering; Engineering management; Project management; Computer science; Software engineering; Database; World Wide Web","score_opus":0.05777940166266098,"score_gpt":0.2888420883696197,"score_spread":0.23106268670695873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740384963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.970862,0.00008986372,0.025086062,0.00010619003,0.00006983315,0.00010750804,0.000010011742,0.000030154262,0.0036384289],"genre_scores_gemma":[0.9919349,0.000036796566,0.007920528,0.000006020444,0.00006344684,0.0000032386981,0.000014996087,0.0000047484837,0.000015343137],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967974,0.0000097331595,0.00013524585,0.000061934195,0.00007274615,0.000040585026],"domain_scores_gemma":[0.999708,0.000024821902,0.000046617137,0.00013211521,0.00008046636,0.000008011882],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000071691415,0.000044683547,0.00005565993,0.000038310023,0.00002430154,0.000015144437,0.00007434818,0.00006155912,0.000038870676],"category_scores_gemma":[0.000046142755,0.000032076026,0.0000051271286,0.00014192493,0.000049529244,0.00037815224,0.000015143515,0.000095481955,3.8397508e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009970921,0.000018728017,0.0022082815,0.00022614571,0.00002756856,5.495439e-8,0.0010613751,0.0009357912,0.4448582,0.0043114307,0.0003980495,0.5459444],"study_design_scores_gemma":[0.0003041628,0.0000411207,0.0026852228,0.00024207041,0.00006857198,0.000028603146,0.0032805111,0.5234948,0.46243262,0.0020085436,0.0052473946,0.00016637876],"about_ca_topic_score_codex":0.000009272785,"about_ca_topic_score_gemma":0.00008910745,"teacher_disagreement_score":0.54577804,"about_ca_system_score_codex":0.000012452128,"about_ca_system_score_gemma":0.000046480316,"threshold_uncertainty_score":0.13080224},"labels":[],"label_agreement":null},{"id":"W2740586905","doi":"10.2495/sdp-v13-n1-73-83","title":"Using BIM models for the design of large rail infrastructure projects: key factors for a successful implementation","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Key (lock); Building information modeling; Construction engineering; Transport engineering; Systems engineering; Engineering; Computer science; Business; Process management; Operations management; Computer security","score_opus":0.03661727406135868,"score_gpt":0.30262833926179106,"score_spread":0.2660110652004324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740586905","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38451633,0.0001299208,0.6147803,0.000019187919,0.00033651316,0.00018472635,0.000008012692,0.000005708478,0.000019302997],"genre_scores_gemma":[0.96355146,0.000013819644,0.03615994,0.000017352846,0.0002018622,0.0000133744015,0.000012440284,0.000009703218,0.000020039311],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930125,0.000009705507,0.00033238076,0.00005606487,0.00016106699,0.00013955006],"domain_scores_gemma":[0.99865055,0.00013779565,0.00018465705,0.00002518178,0.0009799905,0.000021826503],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003327702,0.0000870181,0.000102129176,0.00020947671,0.00013678204,0.000069299516,0.0001193714,0.000040759285,0.000012628965],"category_scores_gemma":[0.0000443063,0.00006233792,0.000032462824,0.000074921016,0.000022236407,0.00041513392,0.000014956642,0.00006048192,2.9045667e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002032271,0.00006807687,0.039731495,0.0007662627,0.003420001,0.000035414745,0.16781572,0.59290457,0.0060497643,0.095924996,0.006533355,0.084718086],"study_design_scores_gemma":[0.0036872458,0.0002559285,0.005511697,0.00029259053,0.00012962054,0.00010329214,0.32935613,0.56857294,0.052084014,0.015872609,0.023727516,0.000406383],"about_ca_topic_score_codex":0.000006568095,"about_ca_topic_score_gemma":0.000002237584,"teacher_disagreement_score":0.5790351,"about_ca_system_score_codex":0.00010736195,"about_ca_system_score_gemma":0.00016848651,"threshold_uncertainty_score":0.25420666},"labels":[],"label_agreement":null},{"id":"W2740950201","doi":"10.2495/sdp-v13-n1-24-35","title":"Implementing a BIM collaborative workflow in the UK construction market","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Building information modeling; Business; Construction engineering; Process management; Engineering; Computer science; Operations management; Database","score_opus":0.007170011977266574,"score_gpt":0.23697621337003402,"score_spread":0.22980620139276745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740950201","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9794947,0.00035690647,0.008626288,0.00016396641,0.0007735747,0.000077623925,0.0000012098598,0.0000116836345,0.0104940515],"genre_scores_gemma":[0.99233764,0.000030166635,0.0071676546,0.00005296878,0.00031121745,0.000004956353,0.0000031716622,0.0000045449565,0.000087696244],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99923855,0.000025574855,0.00031082192,0.000053074215,0.00021098678,0.00016101635],"domain_scores_gemma":[0.9992753,0.00005584973,0.00010258002,0.000025428728,0.0005195165,0.000021270876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005857649,0.000075119555,0.00007933954,0.00028932124,0.00010808611,0.00013987183,0.00012137904,0.000032891658,0.000091352835],"category_scores_gemma":[0.000043729884,0.000057809964,0.0000147385035,0.0002181605,0.000041392697,0.00025563472,0.000019943469,0.00013498678,9.07585e-7],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00062857446,0.000049456114,0.30331263,0.00009474306,0.00083803304,0.0016750853,0.102043964,0.0013700189,0.0004205854,0.073762216,0.018940391,0.49686432],"study_design_scores_gemma":[0.002189076,0.0001199175,0.11283917,0.0005308626,0.00003004011,0.0013669035,0.5186799,0.003715301,0.0041016266,0.009371417,0.34659016,0.00046562808],"about_ca_topic_score_codex":0.0000040036566,"about_ca_topic_score_gemma":0.00001191941,"teacher_disagreement_score":0.4963987,"about_ca_system_score_codex":0.00009848499,"about_ca_system_score_gemma":0.000090219975,"threshold_uncertainty_score":0.2357422},"labels":[],"label_agreement":null},{"id":"W2741022164","doi":"10.2495/sdp-v13-n1-139-150","title":"Investigating benefits and criticisms of BIM for construction scheduling in SMES: An Italian case study","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Business; Architectural engineering; Construction engineering; Operations management; Computer science; Process management; Engineering; Operations research; Risk analysis (engineering); Environmental economics; Economics","score_opus":0.024193725942218268,"score_gpt":0.27705826179947163,"score_spread":0.2528645358572534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741022164","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9931582,0.00023501483,0.006090281,0.000020276324,0.00033416675,0.00010099161,0.0000014152068,0.000008920521,0.000050716117],"genre_scores_gemma":[0.97298163,0.000006238912,0.026864503,0.000009708168,0.00011971493,0.000004756622,0.0000022601125,0.0000066801995,0.0000044816743],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99931014,0.000012680034,0.00038367676,0.00007043218,0.00012260332,0.00010048994],"domain_scores_gemma":[0.9991846,0.000048835005,0.00010473443,0.000022194714,0.0005932094,0.000046414607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003370647,0.000075148804,0.00011388711,0.00036638477,0.00007260429,0.00006413453,0.00005105786,0.00003703204,0.000003102726],"category_scores_gemma":[0.00008728585,0.00007440012,0.00000947602,0.00008485833,0.000049883914,0.0004384697,0.00001441976,0.00008363363,4.4877392e-8],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017430384,0.00012539732,0.46844363,0.000335614,0.00044942525,0.0019522869,0.13967408,0.017223308,0.001961619,0.021282542,0.000024207391,0.3483536],"study_design_scores_gemma":[0.0024699296,0.0005067972,0.025544783,0.00072513695,0.000037919268,0.005653906,0.92772394,0.021205656,0.012486809,0.0029317115,0.00038872432,0.00032468152],"about_ca_topic_score_codex":0.000031197178,"about_ca_topic_score_gemma":0.000025666968,"teacher_disagreement_score":0.7880499,"about_ca_system_score_codex":0.00005412944,"about_ca_system_score_gemma":0.00006243234,"threshold_uncertainty_score":0.3033949},"labels":[],"label_agreement":null},{"id":"W2741242532","doi":"10.2495/sdp-v13-n1-84-95","title":"BIM – Towards the entire lifecycle","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"System lifecycle; Application lifecycle management; Business; Process management; Systems engineering; Product lifecycle; Environmental resource management; Computer science; Engineering; Environmental science; Marketing; New product development","score_opus":0.011679923045136648,"score_gpt":0.2315935351688054,"score_spread":0.21991361212366875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741242532","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97863543,0.0006110475,0.010598348,0.00038987584,0.0015133545,0.000036562233,5.102428e-7,0.00002359985,0.008191281],"genre_scores_gemma":[0.9976373,0.000023256285,0.001210967,0.000078270714,0.0005644795,0.0000017484169,0.0000016524662,0.000005572728,0.00047677933],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99944603,0.000008130994,0.00020739557,0.000039696155,0.00019517844,0.0001035851],"domain_scores_gemma":[0.99940467,0.000019646763,0.00006147512,0.00002684017,0.00045496726,0.000032406333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020428028,0.00006248246,0.000060760525,0.00014089535,0.00009998386,0.00010900187,0.00014002899,0.000029299948,0.000054084278],"category_scores_gemma":[0.000031621537,0.000043610824,0.000020386511,0.00007252634,0.000037519832,0.00022840971,0.00001823531,0.000107128224,0.0000042579672],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024235097,0.000041372263,0.023895692,0.00008336113,0.001184341,0.0009948537,0.04448299,0.0020646213,0.0007699043,0.06843248,0.023346659,0.8344614],"study_design_scores_gemma":[0.0008702629,0.00007924657,0.055331267,0.00022312427,0.000026895932,0.0008019964,0.071010016,0.0033420115,0.015955849,0.00393905,0.84811217,0.00030812732],"about_ca_topic_score_codex":0.0000034047573,"about_ca_topic_score_gemma":9.712951e-7,"teacher_disagreement_score":0.83415323,"about_ca_system_score_codex":0.00006415064,"about_ca_system_score_gemma":0.00007337038,"threshold_uncertainty_score":0.17783977},"labels":[],"label_agreement":null},{"id":"W2741576914","doi":"10.2495/sdp-v13-n1-1-11","title":"Building information modelling in operations of maintenance at the university of Alicante","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universidad de Alicante","keywords":"Civil engineering; Environmental science; Computer science; Transport engineering; Engineering","score_opus":0.007543946305218075,"score_gpt":0.20044717284081864,"score_spread":0.19290322653560057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741576914","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8239854,0.0000950175,0.17502838,0.000055624165,0.00013311466,0.000027492993,0.0000011785356,0.0000028501836,0.0006709567],"genre_scores_gemma":[0.99304503,0.00004053537,0.006790862,0.00000870392,0.00002574203,2.0127915e-7,0.0000020502328,0.0000016980792,0.0000851511],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995434,0.0000074417717,0.0002443861,0.000023217226,0.00012062744,0.00006090072],"domain_scores_gemma":[0.99934757,0.00002056782,0.00008887469,0.00002098065,0.00050900644,0.00001299481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020685984,0.00003832736,0.00006426282,0.0001833056,0.00005329599,0.000014559604,0.00009069428,0.000021935753,0.000016941114],"category_scores_gemma":[0.000017578745,0.000032044085,0.000013930626,0.000087239154,0.00004309995,0.00040180964,0.000022735627,0.00006309231,4.1859585e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002262729,0.000012643783,0.009304105,0.00007440948,0.00017165071,0.000042779477,0.038330283,0.89184785,0.0013649737,0.032457456,0.00066412025,0.025503445],"study_design_scores_gemma":[0.0023969791,0.00010166921,0.02912106,0.0012786246,0.000034205845,0.00027625056,0.151309,0.6618214,0.040167954,0.0020406842,0.11108145,0.0003707062],"about_ca_topic_score_codex":0.000035929595,"about_ca_topic_score_gemma":0.000014362913,"teacher_disagreement_score":0.23002644,"about_ca_system_score_codex":0.00010573958,"about_ca_system_score_gemma":0.00005912011,"threshold_uncertainty_score":0.130672},"labels":[],"label_agreement":null},{"id":"W2741962626","doi":"10.2495/sdp-v13-n1-151-159","title":"BIM and genetic algorithm optimisation for sustainable building envelope design","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Teknologi Malaysia; Ministério da Ciência, Tecnologia e Inovação; Kementerian Sains, Teknologi dan Inovasi; Ministry of Higher Education, Malaysia","keywords":"Building information modeling; Building envelope; Sustainability; Genetic algorithm; Envelope (radar); Process (computing); Building design; Building model; Engineering; Design tool; Sustainable design; Computer science; Systems engineering; Architectural engineering; Simulation; Thermal; Mechanical engineering; Machine learning; Operations management","score_opus":0.013325720960766086,"score_gpt":0.23855505703326707,"score_spread":0.22522933607250098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741962626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24921584,0.0007244402,0.74924153,0.000056484856,0.0003395681,0.00012270824,5.5724666e-7,0.000021676204,0.00027720263],"genre_scores_gemma":[0.52995753,0.00009717893,0.46876174,0.000038563732,0.00048010965,0.000014733933,0.000004296396,0.000016367636,0.00062945555],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992142,0.000012455691,0.00031315384,0.00008967607,0.00016866742,0.00020186245],"domain_scores_gemma":[0.9986896,0.00007082753,0.000103708306,0.000026843534,0.0010477034,0.000061327766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031511445,0.00010835417,0.00011208445,0.00035690505,0.00016059207,0.00019667606,0.00009766486,0.000057599143,0.000011662665],"category_scores_gemma":[0.00007463718,0.000104075625,0.00001872702,0.000088070025,0.00003821949,0.00046118806,0.000027162348,0.00008596866,4.3054465e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042980563,0.00003916933,0.0031393368,0.0003163954,0.00090737897,0.0011926031,0.016851274,0.024578799,0.0018163676,0.033307653,0.0058409316,0.91158026],"study_design_scores_gemma":[0.0063690883,0.0008124529,0.023648825,0.000950861,0.00017142408,0.0032495153,0.14060803,0.238424,0.102392554,0.043695647,0.43796045,0.0017171615],"about_ca_topic_score_codex":0.0000033617282,"about_ca_topic_score_gemma":1.4333263e-7,"teacher_disagreement_score":0.9098631,"about_ca_system_score_codex":0.0001506079,"about_ca_system_score_gemma":0.000120354765,"threshold_uncertainty_score":0.42440808},"labels":[],"label_agreement":null},{"id":"W2744206887","doi":"","title":"Data-Driven Scenario Generation for Enhanced Realism of Equipment Training Simulators","year":2017,"lang":"en","type":"article","venue":"University of Twente Research Information","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Training (meteorology); Virtual reality; Computer science; Dynamism; Popularity; Carving; Heavy equipment; Risk analysis (engineering); Simulation; Engineering management; Human–computer interaction; Engineering","score_opus":0.16552962067498364,"score_gpt":0.3324728220942302,"score_spread":0.16694320141924654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2744206887","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65039885,0.000018579562,0.3335125,0.0001985476,0.00049307256,0.0006477393,0.0004670087,0.00006602751,0.014197666],"genre_scores_gemma":[0.99685735,0.00006192507,0.0026244235,0.0000015267191,0.000026252974,8.171713e-7,0.00035731425,0.0000027590356,0.00006763769],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941194,0.000016157785,0.00015379598,0.000059918515,0.0002392996,0.00011889916],"domain_scores_gemma":[0.9991331,0.0000263539,0.00011110492,0.0003506103,0.00034303684,0.000035754885],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041387978,0.00004566139,0.00008765855,0.00017756266,0.00028233067,0.00003966819,0.0003372336,0.000056754117,0.000024919691],"category_scores_gemma":[0.0000914969,0.000053040458,0.000028880451,0.00004840942,0.000098356984,0.0017204311,0.000077641496,0.00008557061,0.0000044417106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002774538,0.000044592984,0.0004064089,0.0008004154,0.00027026332,6.2310033e-7,0.021881998,0.13298555,0.067810036,0.032988228,0.01907022,0.7234642],"study_design_scores_gemma":[0.000768141,0.00006257984,0.0004929097,0.00006491552,0.000010965217,4.2270383e-7,0.003283247,0.95375735,0.013303349,0.00015680783,0.028021501,0.00007778685],"about_ca_topic_score_codex":0.00012691683,"about_ca_topic_score_gemma":0.00013144435,"teacher_disagreement_score":0.8207718,"about_ca_system_score_codex":0.00008509945,"about_ca_system_score_gemma":0.00006596598,"threshold_uncertainty_score":0.21714878},"labels":[],"label_agreement":null},{"id":"W2745822044","doi":"10.1007/978-3-319-66805-5_23","title":"Research Issues in Attempting to Support an Architecture Firm Transition from Fragmented CAD to BIM Collaborative Design","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Multidisciplinary approach; Computer science; Knowledge management; Architecture; Originality; Engineering management; CAD; Process management; Systems engineering; Engineering; Sociology; Qualitative research","score_opus":0.036752794071263195,"score_gpt":0.3107328956839023,"score_spread":0.2739801016126391,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2745822044","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006395558,0.00013291965,0.99007607,0.000850567,0.00080468575,0.0007213948,0.000054038926,0.0001034457,0.00086132216],"genre_scores_gemma":[0.7282772,0.000029273222,0.2699381,0.0004872838,0.0009381027,0.000072437375,0.000054421304,0.000066291585,0.00013690835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977359,0.00007602524,0.00033588635,0.0007606983,0.0006506487,0.000440799],"domain_scores_gemma":[0.99870515,0.00021063317,0.00004963311,0.00056955474,0.00029082302,0.00017422534],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00078305794,0.00031896314,0.00034047585,0.0011459914,0.00024272228,0.0003919839,0.0007426153,0.00030897147,0.000069269954],"category_scores_gemma":[0.000064315485,0.00031106468,0.000033608674,0.00046667512,0.0002254241,0.00028413214,0.00009045194,0.0009424105,0.00004010623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003840025,0.00000927556,0.000029968704,0.000020026002,0.000009488114,0.000035859513,0.008934518,0.5762783,0.0034056213,0.0003220226,0.00008595912,0.4108305],"study_design_scores_gemma":[0.0014173128,0.0027254617,0.002434629,0.0050902227,0.00003223189,0.00006620861,0.000098943776,0.7518827,0.07656865,0.13876964,0.017572172,0.0033418476],"about_ca_topic_score_codex":0.00028593527,"about_ca_topic_score_gemma":0.0034968539,"teacher_disagreement_score":0.7218816,"about_ca_system_score_codex":0.0003512535,"about_ca_system_score_gemma":0.00024347981,"threshold_uncertainty_score":0.99993414},"labels":[],"label_agreement":null},{"id":"W2746274752","doi":"10.1016/j.proeng.2017.08.017","title":"Method to Enable LCA Analysis through Each Level of Development of a BIM Model","year":2017,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; École de Technologie Supérieure","funders":"Hydro-Québec","keywords":"Building information modeling; Life-cycle assessment; Information model; Engineering; Computer science; Data model (GIS); Systems engineering; Database; Production (economics); Operations management; Artificial intelligence","score_opus":0.06305483547226176,"score_gpt":0.28742425542208255,"score_spread":0.2243694199498208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2746274752","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04827097,0.0000709454,0.9501671,0.000011158357,0.00009070639,0.0000834126,0.000012280688,0.00007983897,0.0012135566],"genre_scores_gemma":[0.5594303,0.000003922486,0.44046748,0.000001809064,0.000016945476,0.00002601133,0.0000023713314,0.000011845853,0.00003929985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992698,0.0000022014538,0.00030135896,0.00012840725,0.0001433818,0.00015486457],"domain_scores_gemma":[0.9995481,0.000014700824,0.000060303762,0.000234043,0.00009607875,0.000046777237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013830498,0.00012548038,0.00025568824,0.00020108242,0.000049399623,0.00002060112,0.00018777618,0.00006396393,0.000012808578],"category_scores_gemma":[0.000041395408,0.00012866313,0.000071140224,0.00024512468,0.000008766792,0.00019021638,0.00003466106,0.000081448045,0.0000027447638],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030715,0.000007501573,0.00031464346,0.00020576587,0.0002642501,1.4607751e-7,0.0014502082,0.92664593,0.0548163,0.0032004158,0.000026391283,0.013065351],"study_design_scores_gemma":[0.0000827001,0.0000045917186,0.00094291614,0.00003252305,0.00006896814,8.835228e-7,0.000045891065,0.6919188,0.3061602,0.00014468025,0.00047448472,0.00012336922],"about_ca_topic_score_codex":0.000020784299,"about_ca_topic_score_gemma":0.000019718298,"teacher_disagreement_score":0.51115936,"about_ca_system_score_codex":0.00004179362,"about_ca_system_score_gemma":0.00004274869,"threshold_uncertainty_score":0.52467304},"labels":[],"label_agreement":null},{"id":"W2747572841","doi":"10.1007/978-3-319-66805-5_21","title":"Digital Synchronous Collaboration Workspace and 3D Interactions for an AEC Project. Decision-Making Scenario Evaluation","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Agence Nationale de la Recherche","keywords":"Session (web analytics); Workspace; Multidisciplinary approach; Architecture; Adaptation (eye); Computer science; Engineering management; Systems engineering; Process management; Engineering; Knowledge management; World Wide Web","score_opus":0.018571225497222572,"score_gpt":0.29600973639956957,"score_spread":0.277438510902347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2747572841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005281438,0.00026399974,0.9917239,0.00004872808,0.0023804614,0.00074902974,0.000020381634,0.00009979582,0.0041855364],"genre_scores_gemma":[0.8067832,0.000028650675,0.19218193,0.000041893687,0.0006889699,0.000064420434,0.000039799168,0.000040225237,0.00013087959],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871707,0.0000078545345,0.0002537135,0.0004852363,0.00034538336,0.00019072401],"domain_scores_gemma":[0.9987758,0.00024334893,0.00013529095,0.0003887181,0.0004116948,0.0000451592],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00029508013,0.00024285357,0.00020012188,0.00042804613,0.0003426809,0.0012519038,0.0002707577,0.00019068485,0.000011168009],"category_scores_gemma":[0.00018589105,0.00023537013,0.000035342702,0.00010974228,0.00021541957,0.0012916832,0.000057842837,0.0002947532,0.0000031648794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009480925,0.0000042516212,0.000015289337,0.00001536425,0.0000066968933,6.293204e-7,0.0004052818,0.085461766,0.000026163965,0.0005811517,0.000024752482,0.91344917],"study_design_scores_gemma":[0.00016530599,0.00008263004,0.000057547313,0.0005572981,0.000019307803,0.00004046675,0.0000031075106,0.9772246,0.000035604022,0.019274548,0.0022646924,0.00027492072],"about_ca_topic_score_codex":0.0000045752704,"about_ca_topic_score_gemma":0.0010023154,"teacher_disagreement_score":0.9131743,"about_ca_system_score_codex":0.00040041163,"about_ca_system_score_gemma":0.00034885222,"threshold_uncertainty_score":0.9997849},"labels":[],"label_agreement":null},{"id":"W2749766199","doi":"10.11159/rtese17.109","title":"Development of a Model for Energy Management Decisions in Refurbishment of Buildings","year":2017,"lang":"en","type":"article","venue":"Proceedings of the International Conference of Recent Trends in Environmental Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Architectural engineering; Computer science; Facility management; Construction engineering; Systems engineering; Engineering; Business","score_opus":0.03220794864399251,"score_gpt":0.24463820448459317,"score_spread":0.21243025584060066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749766199","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9968615,0.000019989371,0.0009929057,0.00004775702,0.000112133595,0.00004933256,0.0000069442376,0.0000031253956,0.0019062902],"genre_scores_gemma":[0.98450863,0.00034444671,0.015098603,0.0000012328402,0.0000027061308,0.000017014641,7.1611873e-7,0.0000035052065,0.000023139164],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992322,3.0749436e-7,0.00028825487,0.00010560582,0.00028702454,0.00008663813],"domain_scores_gemma":[0.999758,0.0000059415725,0.00011924141,0.00005874288,0.00004001255,0.000018058909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019809442,0.00006728672,0.00010450891,0.00024013026,0.000028437777,0.000014064548,0.0004172862,0.000022614722,0.000007722756],"category_scores_gemma":[0.000023486335,0.000058039874,0.000021138994,0.00008992128,0.00012953565,0.00022721404,0.000132359,0.00003683118,1.74445e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019717181,0.00004753036,0.005004234,0.000044783013,0.00001935035,3.6452867e-8,0.00065743114,0.009170761,0.5463425,0.020519614,0.0000066057414,0.4181674],"study_design_scores_gemma":[0.00038655847,0.000014403089,0.05128952,0.0003319268,0.0000061473825,0.0000011311978,0.00035217783,0.4180147,0.5285653,0.00059295056,0.00034829188,0.00009690023],"about_ca_topic_score_codex":0.000006672717,"about_ca_topic_score_gemma":0.00001195577,"teacher_disagreement_score":0.41807052,"about_ca_system_score_codex":0.00012545254,"about_ca_system_score_gemma":0.000010825901,"threshold_uncertainty_score":0.23667973},"labels":[],"label_agreement":null},{"id":"W2752201218","doi":"10.1016/j.autcon.2017.08.006","title":"Developing owner information requirements for BIM-enabled project delivery and asset management","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":199,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Process management; Documentation; Requirements analysis; Asset (computer security); Interoperability; Process (computing); Asset management; Requirements management; Facility management; Integrated project delivery; Usability; Knowledge management; Requirements elicitation; Information model; Systems engineering; Engineering management; Computer science; Project management; Engineering; Business; Software engineering; Operations management; Software","score_opus":0.0240650905787071,"score_gpt":0.2669994118936201,"score_spread":0.242934321314913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2752201218","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5902335,0.0000331087,0.39296556,0.00036747055,0.0029384063,0.0016255162,0.000028648152,0.000605358,0.011202417],"genre_scores_gemma":[0.93868506,0.00013883704,0.06066044,0.000031124633,0.000055487795,0.00029594282,0.00008334388,0.000011647854,0.00003810737],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992741,0.000013653448,0.00034115015,0.000115008195,0.00011749573,0.00013863618],"domain_scores_gemma":[0.9995625,0.000015529306,0.00014450533,0.00016831903,0.000091144946,0.000017995053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017671313,0.00011455417,0.000104711886,0.0003043409,0.000278143,0.00027615952,0.000078146855,0.000089547386,0.000011177555],"category_scores_gemma":[0.000029424049,0.00010518072,0.00002245825,0.00008893177,0.000051505558,0.0021188504,0.000022154109,0.00006240835,0.0000082582055],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001786393,0.00000361133,0.0063957092,0.0002854557,0.00004455311,3.6351398e-7,0.00016284175,0.0003625755,0.0001658213,0.07990089,0.0004044736,0.9122558],"study_design_scores_gemma":[0.005885058,0.00007795032,0.34491476,0.00058690633,0.00010949498,0.00013863518,0.0032290285,0.546189,0.007818849,0.037134554,0.052793294,0.0011224439],"about_ca_topic_score_codex":0.000029540804,"about_ca_topic_score_gemma":0.000031933116,"teacher_disagreement_score":0.9111334,"about_ca_system_score_codex":0.00016510347,"about_ca_system_score_gemma":0.000027476783,"threshold_uncertainty_score":0.42891452},"labels":[],"label_agreement":null},{"id":"W2755056305","doi":"","title":"The ACR: Advanced Design Features for a Short Construction Schedule (S494)","year":2003,"lang":"en","type":"article","venue":"NCSU Libraries Repository (North Carolina State University Libraries)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Schedule; Computer science","score_opus":0.006331406127469621,"score_gpt":0.16391070116881046,"score_spread":0.15757929504134083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2755056305","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26133645,0.006613206,0.66200423,0.0003151095,0.0093239825,0.0028297359,0.0003170284,0.003478409,0.053781856],"genre_scores_gemma":[0.91782475,0.0006719789,0.071878776,0.00007873474,0.00027863923,0.00004411884,0.00011974386,0.00012994285,0.008973338],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984207,0.00015793623,0.00032467846,0.0003813724,0.00023537905,0.0004799176],"domain_scores_gemma":[0.99882615,0.00030259293,0.000096340045,0.000441467,0.00015029174,0.00018315246],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.000085726235,0.00034388722,0.00027872046,0.00014752807,0.0015011979,0.0004231699,0.00035572916,0.00019470336,0.00001532172],"category_scores_gemma":[0.00004843842,0.00032367292,0.00017317699,0.00044348452,0.0005440246,0.0023556089,0.000050313552,0.0003662981,0.000003885554],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024567174,0.0000922075,0.03070204,0.00029377858,0.0011187436,0.00012463222,0.0035141318,0.044531904,0.0022062294,0.77204967,0.030444259,0.11246571],"study_design_scores_gemma":[0.0019162333,0.00032063696,0.0063773,0.00005182657,0.00020343809,0.0002895203,0.0049479343,0.007313701,0.07517242,0.011430351,0.89075917,0.0012174456],"about_ca_topic_score_codex":0.0000067434185,"about_ca_topic_score_gemma":0.000023156144,"teacher_disagreement_score":0.8603149,"about_ca_system_score_codex":0.00010798856,"about_ca_system_score_gemma":0.00036350414,"threshold_uncertainty_score":0.99992156},"labels":[],"label_agreement":null},{"id":"W2756246172","doi":"","title":"Computer Science Building","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.015151511499566575,"score_gpt":0.22205601167830608,"score_spread":0.20690450017873951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2756246172","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17076798,0.000016448532,0.771584,0.000025561762,0.00096024584,0.000013461552,8.7781736e-8,0.00024875472,0.056383472],"genre_scores_gemma":[0.9681015,3.922082e-7,0.031748474,0.000024116172,0.00006988782,6.8577344e-7,8.48717e-8,0.0000016929034,0.00005316363],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998299,7.682645e-7,0.00003003601,0.000033463017,0.000058275637,0.000047562295],"domain_scores_gemma":[0.9998929,0.0000014685195,0.0000017371618,0.000038322287,0.000030403444,0.00003516511],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000048541202,0.00001916536,0.000016230957,0.000032660726,0.000015506941,0.000026328113,0.000036346308,0.000008022145,0.000022813112],"category_scores_gemma":[0.0000019928254,0.00001595468,0.000004342945,0.0001025444,0.000027923907,0.00011861526,0.000005424972,0.000019774978,0.00004464716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010055412,0.0000039887527,0.0013045593,0.000004670343,0.0000048474685,7.744136e-7,0.00026180115,0.033398822,0.022375127,0.33781877,0.014244021,0.5905816],"study_design_scores_gemma":[0.00010758507,0.0000108060185,0.0005690969,0.0000039112106,0.0000011120779,0.00001991746,0.000054872387,0.93521345,0.042268455,0.0026759466,0.018989775,0.000085077365],"about_ca_topic_score_codex":0.000003074291,"about_ca_topic_score_gemma":0.0000010766529,"teacher_disagreement_score":0.90181464,"about_ca_system_score_codex":0.0000223142,"about_ca_system_score_gemma":0.000011177116,"threshold_uncertainty_score":0.06506129},"labels":[],"label_agreement":null},{"id":"W2763963636","doi":"10.5281/zenodo.1011129","title":"An Innovative Raft To Boost The Mollusk Farming Industry","year":2017,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Research & Development Corporation","funders":"European Commission","keywords":"Context (archaeology); Tourism; Business; Agriculture; Reinforced concrete; Engineering; Environmental resource management; Environmental science; Geography","score_opus":0.029780416853016804,"score_gpt":0.25563551268047247,"score_spread":0.22585509582745567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2763963636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.577522,0.00004392,0.02401839,0.002527192,0.00072483165,0.0007283666,0.00019406008,0.0020822682,0.39215901],"genre_scores_gemma":[0.99845046,0.000007185582,0.00016967714,0.00012843375,0.00020175468,7.804679e-8,0.00010715262,0.00048360706,0.0004516503],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99922,0.00007255938,0.00014739596,0.0001803782,0.00017792512,0.00020173298],"domain_scores_gemma":[0.99888986,0.0000068730483,0.00004839953,0.0005644639,0.00038898556,0.000101394886],"candidate_categories":["sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00030106533,0.00009992796,0.000074181895,0.0001104335,0.0029233166,0.0012537388,0.0009275638,0.000086628235,0.0027460102],"category_scores_gemma":[0.0002469328,0.00008721492,0.000017959183,0.00027642475,0.00011573521,0.0004012149,0.00028646534,0.00042395262,0.0019105515],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034639063,0.0000383933,0.00004969495,0.000024119154,0.000062943676,0.0000070017445,0.004827577,0.0014638654,0.031691454,0.020170234,0.0851725,0.8564576],"study_design_scores_gemma":[0.00019035938,0.00007206424,0.0040123803,0.000019222165,0.0000049672453,0.000047791058,0.00065927755,0.0025129877,0.0034192936,0.000127573,0.9887861,0.00014795887],"about_ca_topic_score_codex":0.0000180135,"about_ca_topic_score_gemma":0.0000013276326,"teacher_disagreement_score":0.9036136,"about_ca_system_score_codex":0.00007910362,"about_ca_system_score_gemma":0.0000024667509,"threshold_uncertainty_score":0.99978304},"labels":[],"label_agreement":null},{"id":"W2765802497","doi":"10.18162/ritpu-2017-v14n2-01","title":"Les enjeux liés à l’intégration de l’approche BIM de modélisation des données du bâtiment à l’enseignement universitaire : cas d’une école d’ingénierie","year":2017,"lang":"fr","type":"article","venue":"Revue internationale des technologies en pédagogie universitaire","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.03668338961680805,"score_gpt":0.2553447994559417,"score_spread":0.21866140983913362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765802497","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82822114,0.0027222065,0.13508308,0.019292362,0.00077780825,0.00044357503,0.00009517509,0.0011731529,0.012191506],"genre_scores_gemma":[0.96080106,0.006520188,0.021352615,0.000012692079,0.00020465888,0.00003315585,0.000074744654,0.000053690954,0.010947195],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99806035,0.00008222983,0.00040563554,0.00053245504,0.00030630786,0.0006130225],"domain_scores_gemma":[0.9980812,0.00014865489,0.00037388684,0.00069195806,0.0005944602,0.000109850975],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.00026867414,0.0004710336,0.00033304523,0.0005068453,0.0017193718,0.00036378842,0.0011904739,0.00072923035,0.00020828469],"category_scores_gemma":[0.0005380633,0.00058464764,0.00024745223,0.000299497,0.0012012742,0.0016554128,0.00043084082,0.0005685116,0.000044714885],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007092006,0.00016225196,0.01921238,0.00059642835,0.00054011575,0.00023058888,0.008224583,0.028013522,0.004404346,0.15993166,0.0014920676,0.7771211],"study_design_scores_gemma":[0.0033844106,0.0011062508,0.056777015,0.005293293,0.001018796,0.0013037904,0.36560056,0.27361968,0.07860635,0.1330257,0.077668354,0.0025957774],"about_ca_topic_score_codex":0.0029612244,"about_ca_topic_score_gemma":0.0030441554,"teacher_disagreement_score":0.77452534,"about_ca_system_score_codex":0.0068232734,"about_ca_system_score_gemma":0.0003545881,"threshold_uncertainty_score":0.9996605},"labels":[],"label_agreement":null},{"id":"W2768018811","doi":"10.4018/ij3dim.2017040102","title":"Minimizing Construction Emissions Using Building Information Modeling and Decision-Making Techniques","year":2017,"lang":"en","type":"article","venue":"International Journal of 3-D Information Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Building information modeling; Greenhouse gas; Multiple-criteria decision analysis; Life-cycle assessment; Order (exchange); Computer science; Environmental impact assessment; Engineering; Operations research; Environmental economics; Operations management; Production (economics); Business; Machine learning","score_opus":0.016067031512932723,"score_gpt":0.28645043827290395,"score_spread":0.27038340675997125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768018811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3079794,0.000052921514,0.6896183,0.000057953985,0.0013710045,0.00006146988,0.0000074460854,0.00005996424,0.0007915344],"genre_scores_gemma":[0.7508738,0.00018823323,0.2486483,0.000047896745,0.00022627559,0.0000022140246,0.0000046570963,0.0000082885435,3.1762164e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99811333,0.000010873751,0.0011443571,0.00006360588,0.0005185365,0.00014932021],"domain_scores_gemma":[0.99792886,0.00004208763,0.0006549333,0.00015585124,0.0011396047,0.00007866848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043478544,0.00016829731,0.0001910271,0.00074416527,0.00041671694,0.0010100781,0.00036811805,0.00014097932,0.000019629077],"category_scores_gemma":[0.0003493047,0.00016501996,0.000096605916,0.00006167085,0.00004402927,0.012042737,0.00007926122,0.00032178927,0.000003000754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034311513,0.000002204668,0.00011726273,0.000014616722,0.000044913028,8.2044363e-7,0.0004375366,0.5909826,0.0006752757,0.0021346405,0.000016177939,0.4055396],"study_design_scores_gemma":[0.00032975964,0.000011630558,0.000015091357,0.00069990515,0.000023941133,0.0005154938,0.00095261255,0.9887564,0.0007258932,0.0072954246,0.0005110797,0.00016276666],"about_ca_topic_score_codex":0.00001884142,"about_ca_topic_score_gemma":0.0000016010723,"teacher_disagreement_score":0.4428944,"about_ca_system_score_codex":0.00023297132,"about_ca_system_score_gemma":0.00007992594,"threshold_uncertainty_score":0.97402066},"labels":[],"label_agreement":null},{"id":"W2769859124","doi":"10.5539/emr.v7n1p1","title":"A Framework for Building Design Management in an Imperfect BIM Environment","year":2017,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Building information modeling; Multidisciplinary approach; Design process; Process management; Software; Scheme (mathematics); Information flow; Computer science; Imperfect; Engineering; Systems engineering; Knowledge management; Engineering management; Operations management; Work in process","score_opus":0.06319024100301474,"score_gpt":0.3370511263560789,"score_spread":0.2738608853530642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2769859124","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030351296,0.00014323542,0.9657262,0.00008050039,0.0004002954,0.0011490372,0.0000021265012,0.00020432094,0.0019430144],"genre_scores_gemma":[0.76654,0.00033893329,0.23184557,0.0000037688114,0.00011901973,0.0009241932,0.000003835452,0.000051417726,0.00017328317],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985636,0.00003090197,0.00020342544,0.00031502792,0.00033890453,0.0005481641],"domain_scores_gemma":[0.9990907,0.000080342776,0.000019429814,0.00070410734,0.000018041052,0.00008738773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010360761,0.00017391081,0.00013627819,0.0005317911,0.00025219377,0.00033183765,0.00052174344,0.00008745566,0.000046742964],"category_scores_gemma":[0.000026142605,0.00018911583,0.000046812216,0.0001332325,0.00003774315,0.00030279817,0.00013613711,0.00033071366,0.000030234914],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030409085,0.000044832133,0.00023552908,0.00043584083,0.00013552385,0.000037150236,0.00010321949,0.39859673,0.0012448699,0.43109137,0.0002914006,0.16775313],"study_design_scores_gemma":[0.001062521,0.0001697024,0.013035329,0.00035846917,0.000031740856,0.0000031687798,0.00032850102,0.9310614,0.0047472096,0.025124166,0.023476237,0.00060154096],"about_ca_topic_score_codex":0.0000065138615,"about_ca_topic_score_gemma":0.0000019776405,"teacher_disagreement_score":0.7361887,"about_ca_system_score_codex":0.00025950104,"about_ca_system_score_gemma":0.0000031489183,"threshold_uncertainty_score":0.771192},"labels":[],"label_agreement":null},{"id":"W2770918708","doi":"10.1061/(asce)ps.1949-1204.0000297","title":"Productivity Analysis of Lateral CIPP Rehabilitation Process Using <i>Simphony</i> Simulation Modeling","year":2017,"lang":"en","type":"article","venue":"Journal of Pipeline Systems Engineering and Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Process (computing); Productivity; Resource (disambiguation); Engineering; Resource allocation; Duration (music); Computer science; Operations research; Systems engineering; Construction engineering; Aeronautics","score_opus":0.021019469487072985,"score_gpt":0.2979930630387638,"score_spread":0.27697359355169077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2770918708","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6890099,0.0004308945,0.30969876,0.00004441163,0.0006607356,0.00006921642,0.0000052435835,0.000022404343,0.00005844611],"genre_scores_gemma":[0.99659336,0.000030856532,0.0030679528,0.0000014004792,0.00028419984,0.0000015024075,0.0000012447668,0.000014549537,0.000004935486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892986,0.000050015253,0.0005854527,0.00009282793,0.00024925714,0.00009256142],"domain_scores_gemma":[0.998383,0.00026343614,0.0005042924,0.00018235712,0.00061735895,0.00004957698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009689349,0.00011372148,0.00032126092,0.00032355593,0.000080489466,0.00012972266,0.00009472997,0.000073464355,0.0000013517545],"category_scores_gemma":[0.0014856961,0.00010515935,0.00008133743,0.00019461168,0.000016704536,0.0013421433,0.000009062289,0.00019045123,2.892597e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004602352,0.000013959635,0.0018818956,0.00022311683,0.00025919755,0.000001247778,0.000417467,0.99224204,0.004085678,0.000040897063,0.0000042145666,0.0007842533],"study_design_scores_gemma":[0.00020853995,0.000033022272,0.00088760385,0.00014836031,0.00062330987,0.00007832603,0.00027068032,0.9971638,0.00020541924,0.000011571596,0.0002706306,0.00009874057],"about_ca_topic_score_codex":0.00003937596,"about_ca_topic_score_gemma":0.0000028239297,"teacher_disagreement_score":0.30758345,"about_ca_system_score_codex":0.000044977955,"about_ca_system_score_gemma":0.000023591281,"threshold_uncertainty_score":0.4288274},"labels":[],"label_agreement":null},{"id":"W2772066927","doi":"10.29173/mocs158","title":"Design Breakdown in Industrialized Construction: Supporting Lean Manufacturing","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"VINNOVA","keywords":"Standardization; Lean manufacturing; Modular design; Context (archaeology); Manufacturing engineering; Lean construction; Lean project management; Process (computing); Supply chain; Process management; Engineering; Computer science; Business; Construction engineering; Construction industry; Marketing","score_opus":0.024378436996921063,"score_gpt":0.21786821238787568,"score_spread":0.19348977539095463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772066927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9660638,0.00029920822,0.02603486,0.00014562742,0.0018342296,0.0005211221,0.0000084929225,0.0006324588,0.0044602207],"genre_scores_gemma":[0.9821215,0.00009147612,0.017111205,0.00003791827,0.000380085,0.000053164356,0.000018157376,0.000051430325,0.00013506433],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99797434,0.000025760884,0.0007206766,0.00047844712,0.00032926098,0.00047154247],"domain_scores_gemma":[0.9991908,0.00002575989,0.00017766378,0.00013521769,0.0002029447,0.00026763364],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000546457,0.00037974198,0.00042944905,0.0005046897,0.00017130448,0.00025503247,0.0001346573,0.00037018978,0.00010253132],"category_scores_gemma":[0.00006206828,0.00040573196,0.00007641787,0.00043090686,0.00026747168,0.00093582354,0.000043922282,0.0005361218,0.000020545616],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045284355,0.000058274203,0.10394382,0.00033090322,0.00025723994,0.00003819097,0.002443928,0.0065692803,0.013075416,0.021028308,0.003753313,0.8480485],"study_design_scores_gemma":[0.02785596,0.0007892234,0.013563733,0.0013787352,0.0006233995,0.0071559534,0.053757407,0.21404435,0.5253069,0.05054858,0.09836462,0.006611153],"about_ca_topic_score_codex":0.000059674385,"about_ca_topic_score_gemma":0.000020235857,"teacher_disagreement_score":0.84143734,"about_ca_system_score_codex":0.00021865622,"about_ca_system_score_gemma":0.00007425994,"threshold_uncertainty_score":0.9998394},"labels":[],"label_agreement":null},{"id":"W2781025201","doi":"10.4322/rae.v12n2.e201716","title":"SUPORTES DE SIMULAÇÃO COMO OBJETOS INTERMEDIÁRIOS DE CONCEPÇÃO: EXPERIÊNCIAS NA INDÚSTRIA DE REFINO DE PETRÓLEO","year":2017,"lang":"pt","type":"article","venue":"Revista Ação Ergonômica","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Humanities; Art","score_opus":0.021765040611141522,"score_gpt":0.2859634841043981,"score_spread":0.26419844349325655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2781025201","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9530787,0.0043440307,0.034537934,0.0004956012,0.0015349863,0.0006349087,0.00018706446,0.0005158509,0.0046709273],"genre_scores_gemma":[0.99324757,0.0012940421,0.0019017911,0.0003259752,0.00087551743,0.00010645603,0.000057840225,0.0001547116,0.0020361259],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961873,0.00030626345,0.0010324102,0.0006769457,0.00037741783,0.0014196472],"domain_scores_gemma":[0.9967111,0.00026351534,0.0005797228,0.001555372,0.00021255914,0.0006777813],"candidate_categories":["metaepi_narrow","scholarly_communication","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008637518,0.00073032896,0.00087146607,0.00021052487,0.0007861621,0.0010662071,0.0011848364,0.000778944,0.00091854716],"category_scores_gemma":[0.0013503275,0.00081349263,0.00046018607,0.00018369142,0.00042840748,0.00049278635,0.00020646185,0.0012309102,0.0001934204],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013471047,0.00082189677,0.2481805,0.0048085004,0.0024492159,0.0012264986,0.053731017,0.0049556433,0.30837783,0.06261995,0.05354587,0.257936],"study_design_scores_gemma":[0.009773057,0.0009300022,0.11323634,0.009654406,0.0017725668,0.0030738125,0.017776972,0.43489245,0.099732496,0.0018335725,0.30064029,0.006684045],"about_ca_topic_score_codex":0.00042236169,"about_ca_topic_score_gemma":0.00016403268,"teacher_disagreement_score":0.42993683,"about_ca_system_score_codex":0.001690599,"about_ca_system_score_gemma":0.0010233157,"threshold_uncertainty_score":0.99999475},"labels":[],"label_agreement":null},{"id":"W2782111846","doi":"10.52842/conf.ecaade.2017.1.103","title":"Improving Proactive Collaborative Design Through the Integration of BIM and Agent-Based Simulations","year":2017,"lang":"en","type":"article","venue":"eCAADe proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of North Carolina at Charlotte; Politechnika Lódzka; Zayed University; University of Melbourne; Southeast University; Rangsit University; Arab Academy for Science, Technology and Maritime Transport; Istanbul Teknik Üniversitesi; Università di Pisa; Universidade Federal de Santa Catarina; Austrian Institute of Technology; Bilkent Üniversitesi; University of Cyprus; Univerza v Ljubljani; Università di Bologna; Universidade de Lisboa; Hague University of Applied Sciences; National Cheng Kung University; University of British Columbia; Korea Advanced Institute of Science and Technology; Politechnika Bialostocka; Technische Universiteit Eindhoven; University of Crete; Simon Fraser University; National University of Singapore; Orta Doğu Teknik Üniversitesi; KU Leuven; Nottingham Trent University; Aalto-Yliopisto; TU Graz, Internationale Beziehungen und Mobilitätsprogramme; University of Southern California; Yonsei University; Aalborg Universitet; Technische Universiteit Delft; Curtin University of Technology; Trent University; Università degli Studi di Palermo; Tianjin University; Deakin University; Nanjing Institute of Technology; RMIT University; University of Patras; Eidgenössische Technische Hochschule Zürich; University of Technology Sydney; George Mason University; Technische Universität Wien; Sapienza Università di Roma; Universidad de Alicante; Tulane University; České Vysoké Učení Technické v Praze","keywords":"Computer science; Collaborative design; Systems engineering; Process management; Human–computer interaction; Knowledge management; Computer architecture; Software engineering; Engineering; Systems design","score_opus":0.028687033786477422,"score_gpt":0.25455082038131416,"score_spread":0.22586378659483675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782111846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3589906,0.0002836504,0.62884504,0.0012448508,0.0005050053,0.0013570095,0.000040026953,0.0002631844,0.008470631],"genre_scores_gemma":[0.9884177,0.000010044038,0.011394931,0.000017376184,0.000057603662,0.000050811108,0.0000025013867,0.000013242352,0.00003577686],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995181,0.000006605771,0.00015596832,0.00012186257,0.00010212972,0.00009533504],"domain_scores_gemma":[0.999448,0.000042180225,0.00013732293,0.00009640889,0.0002555682,0.000020506797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000088456596,0.00010782249,0.00009981941,0.000042053354,0.00034814968,0.00017316836,0.00011132561,0.00006642704,0.000010769866],"category_scores_gemma":[0.00014561652,0.00007907963,0.00002112956,0.000106679705,0.00014373027,0.000636693,0.000014252112,0.00012500444,0.0000014617882],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020954853,0.00008111572,0.003942621,0.00031163823,0.0002924787,7.853612e-7,0.027422573,0.012938722,0.67536545,0.12854193,0.00182328,0.14906985],"study_design_scores_gemma":[0.00047957865,0.00008535369,0.0036883699,0.000068793175,0.000059394464,0.0000028358152,0.0036384433,0.5091067,0.47740915,0.0046402374,0.0006316115,0.00018951384],"about_ca_topic_score_codex":0.000033326123,"about_ca_topic_score_gemma":0.000012484349,"teacher_disagreement_score":0.6294271,"about_ca_system_score_codex":0.000037828366,"about_ca_system_score_gemma":0.00003106202,"threshold_uncertainty_score":0.3224774},"labels":[],"label_agreement":null},{"id":"W2782433133","doi":"10.1139/cjce-2017-0540","title":"Construction productivity fuzzy knowledge base management system","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Knowledge base; Productivity; Fuzzy logic; Computer science; Fuzzy set; Data mining; Process (computing); Function (biology); Operations research; Industrial engineering; Artificial intelligence; Engineering","score_opus":0.0061411202440411605,"score_gpt":0.1710154705746404,"score_spread":0.16487435033059925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782433133","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25768697,0.0037322463,0.44020477,0.00017162287,0.03611987,0.0005080992,0.000033328906,0.0006216594,0.26092145],"genre_scores_gemma":[0.9971699,0.000008018684,0.001787761,0.0000027757426,0.00094089215,0.0000037313096,8.4359476e-7,0.000024626655,0.000061424056],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992876,0.000011157985,0.00027688313,0.000087091066,0.00008842918,0.00024886028],"domain_scores_gemma":[0.99930865,0.0000084369185,0.000048915903,0.00013292007,0.00018518935,0.00031589877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019777464,0.00012920858,0.00015020331,0.00047757357,0.00007401721,0.000051355022,0.000108998465,0.000060898095,0.00007769225],"category_scores_gemma":[0.000017397777,0.00013564555,0.000060331706,0.0002914534,0.00005269126,0.00023421101,0.000003983824,0.0001828451,0.000026993874],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004304945,0.00004332966,0.006821008,0.003983907,0.0017038491,0.0005961263,0.004059826,0.2308821,0.013931403,0.32181677,0.041707866,0.37441078],"study_design_scores_gemma":[0.0031615726,0.0005104939,0.019620266,0.0041496316,0.0005797603,0.012453596,0.004456071,0.24534664,0.03369364,0.0013907995,0.67201513,0.0026224207],"about_ca_topic_score_codex":0.000045670826,"about_ca_topic_score_gemma":0.015491179,"teacher_disagreement_score":0.73948294,"about_ca_system_score_codex":0.00041080936,"about_ca_system_score_gemma":0.00012384381,"threshold_uncertainty_score":0.8644442},"labels":[],"label_agreement":null},{"id":"W278338962","doi":"10.1007/978-3-319-07977-6_21","title":"Software Interoperability for Energy Efficient Building Operations Based on the IFC Data Model Standard","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Computer science; Software engineering; Software; Database; Systems engineering; Programming language; Operating system; Engineering","score_opus":0.03129992098616422,"score_gpt":0.2324877924081429,"score_spread":0.2011878714219787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W278338962","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000032168355,0.00003202692,0.94492024,0.00022584162,0.00043738086,0.00025373665,0.00068369246,0.0002578958,0.05315701],"genre_scores_gemma":[0.62859267,0.00007054347,0.15352254,0.00262444,0.0011152866,0.0005467992,0.0032296872,0.0004902799,0.20980775],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990383,0.0000110103565,0.00028846084,0.0003413718,0.00018924427,0.00013160626],"domain_scores_gemma":[0.99865943,0.00013723834,0.000025284391,0.0009812253,0.0001535031,0.000043322194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021682936,0.00025381212,0.00020648082,0.00007578819,0.00016699982,0.00010501522,0.0003709802,0.00018258898,0.00039483787],"category_scores_gemma":[0.000057663903,0.00016950563,0.00009358527,0.000016448334,0.000056467867,0.000041195843,0.00005247302,0.00021097284,0.000007932045],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010047563,0.0000019858446,1.518786e-7,0.000016269698,0.000018128421,3.301481e-8,0.000007050186,0.58526486,0.000022118185,0.39779902,0.004488832,0.012371487],"study_design_scores_gemma":[0.00012000007,0.00002873505,9.687488e-8,0.000078029545,0.000028750714,6.2184074e-7,0.0000052545897,0.90053076,0.0003201822,0.0020686674,0.09663658,0.00018232621],"about_ca_topic_score_codex":0.000009903297,"about_ca_topic_score_gemma":0.0001661016,"teacher_disagreement_score":0.7913977,"about_ca_system_score_codex":0.00013776877,"about_ca_system_score_gemma":0.000071393224,"threshold_uncertainty_score":0.69122386},"labels":[],"label_agreement":null},{"id":"W2783414237","doi":"10.5555/3242181.3242381","title":"Criticality visualization using 4D simulation for major capital projects","year":2017,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Hydro-Québec","funders":"","keywords":"Criticality; Visualization; Critical path method; Computer science; Coding (social sciences); Scheduling (production processes); Float (project management); Failure mode, effects, and criticality analysis; Dimension (graph theory); Graphical user interface; Industrial engineering; Distributed computing; Real-time computing; Operations research; Data mining; Systems engineering; Engineering","score_opus":0.07710769506396908,"score_gpt":0.35177122524420595,"score_spread":0.27466353018023687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783414237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2571588,0.000008570171,0.740866,0.00003458424,0.00065771944,0.0003520857,0.000019470679,0.00015466305,0.0007480994],"genre_scores_gemma":[0.997387,7.429099e-7,0.0021964242,0.000027072558,0.00022704659,0.000029194602,0.000043289994,0.000023097386,0.00006614108],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916756,0.000022390122,0.000295318,0.00020772278,0.00013777496,0.00016925928],"domain_scores_gemma":[0.99905306,0.00009314364,0.000091361326,0.00029181832,0.00041929516,0.000051330324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010662543,0.00014768643,0.00013674772,0.00007661919,0.00039614883,0.00048230687,0.00013307607,0.00011844916,0.00012308586],"category_scores_gemma":[0.00022969773,0.0001557828,0.00006408004,0.00003924176,0.00008356154,0.00078668323,0.000020094652,0.00007330783,0.000010228139],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064734115,0.000022767066,0.0028063531,0.000118433636,0.000035843106,4.6032895e-7,0.00073843333,0.93369716,0.0028762498,0.04419251,0.000022951057,0.015424122],"study_design_scores_gemma":[0.00064277544,0.000022797241,0.0033698606,0.000052668816,0.000026112943,0.0000010689561,0.000089101566,0.99026513,0.002005066,0.0029509594,0.00039196888,0.00018250216],"about_ca_topic_score_codex":0.000019689087,"about_ca_topic_score_gemma":0.00003810359,"teacher_disagreement_score":0.7402282,"about_ca_system_score_codex":0.000073839314,"about_ca_system_score_gemma":0.000040832645,"threshold_uncertainty_score":0.6352638},"labels":[],"label_agreement":null},{"id":"W2783699638","doi":"10.5555/3242181.3242394","title":"Synthesizing engineering design, material takeoff and simulation-based estimating on a bridge deck reinforcement case","year":2017,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Takeoff; Cost estimate; Bridge (graph theory); Lapping; Computer science; Discrete event simulation; Reinforcement; Benchmark (surveying); Reliability engineering; Operations research; Industrial engineering; Engineering; Simulation; Structural engineering; Automotive engineering; Systems engineering; Aeronautics; Mechanical engineering","score_opus":0.04693528544244396,"score_gpt":0.2720019628086853,"score_spread":0.22506667736624136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783699638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26385626,0.000003817078,0.7349827,0.00002752946,0.0005651222,0.00017894311,0.00000662725,0.00017861754,0.00020033472],"genre_scores_gemma":[0.99092263,5.0430714e-7,0.008819796,0.000027798565,0.00016038667,0.000022826454,0.000008566607,0.000025300596,0.000012211407],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991877,0.00001933344,0.0002917584,0.00019961798,0.00012941321,0.00017219147],"domain_scores_gemma":[0.99912965,0.0002978642,0.00010113508,0.00030288,0.00009967376,0.00006881763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012555541,0.00019547933,0.00015185417,0.00010148451,0.00027794845,0.00047174952,0.00010140485,0.00008400564,0.000133268],"category_scores_gemma":[0.00024369101,0.00020305967,0.000032990207,0.000028392424,0.00003601239,0.000357551,0.000020446749,0.00010996051,0.000014349114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002614263,0.0000034893455,0.00020299124,0.000037587393,0.000014654367,0.00001812494,0.00015095816,0.98543763,0.0009867112,0.00035991325,0.000005340286,0.012756442],"study_design_scores_gemma":[0.00032182428,0.00003690033,0.0018352938,0.00020636209,0.000015706157,0.00001573374,0.000014054751,0.99432826,0.0028442,0.00005138455,0.00012047094,0.00020978751],"about_ca_topic_score_codex":0.000021942875,"about_ca_topic_score_gemma":0.0000073948167,"teacher_disagreement_score":0.72706634,"about_ca_system_score_codex":0.00005928052,"about_ca_system_score_gemma":0.000020411826,"threshold_uncertainty_score":0.8280533},"labels":[],"label_agreement":null},{"id":"W2784939162","doi":"","title":"Evaluating Unbonded Concrete Overlay for Usage on Ontario Residential Streets","year":2018,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Overlay; Civil engineering; Engineering; Architectural engineering; Transport engineering; Forensic engineering; Construction engineering; Computer science","score_opus":0.01788732872061647,"score_gpt":0.2340416379077353,"score_spread":0.21615430918711884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2784939162","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99466735,0.000024124098,0.00009027894,0.0000325995,0.0015541129,0.00035198257,0.00006290348,0.00011387686,0.0031027466],"genre_scores_gemma":[0.29239064,0.000020003758,0.00796307,0.000011049975,0.00024823533,0.0000038517674,0.0015916023,0.000074119336,0.69769746],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9990934,0.000025054987,0.0001455052,0.00026692427,0.00026697433,0.00020213825],"domain_scores_gemma":[0.99932367,0.000034733395,0.00014623826,0.00021980975,0.00021790882,0.00005765097],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000119932214,0.00022335141,0.0002861687,0.00021087953,0.00017593236,0.000029310886,0.00018835366,0.0003321847,0.0008072728],"category_scores_gemma":[0.0000127724825,0.00027473367,0.0001715766,0.000081461585,0.000048377336,0.0001741505,0.00001151363,0.00022385716,0.000044160242],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0047767144,0.0000643579,0.0009392992,0.0030879523,0.002569755,0.000048419974,0.5519922,0.003669016,0.2479526,0.008031267,0.08666287,0.09020556],"study_design_scores_gemma":[0.019572811,0.006599969,0.041418526,0.005644979,0.0041592414,0.000020351243,0.46862555,0.07679469,0.3187937,0.005051988,0.046850525,0.0064676567],"about_ca_topic_score_codex":0.059205133,"about_ca_topic_score_gemma":0.6143975,"teacher_disagreement_score":0.70227677,"about_ca_system_score_codex":0.00024659903,"about_ca_system_score_gemma":0.00012382737,"threshold_uncertainty_score":0.9999705},"labels":[],"label_agreement":null},{"id":"W2786387705","doi":"10.1139/cjce-2017-0359","title":"Location-based planning and scheduling of highway construction projects in hilly terrain using GIS","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Terrain; Plan (archaeology); Geographic information system; Transport engineering; Computer science; Scheduling (production processes); Variety (cybernetics); Engineering; Geography; Remote sensing; Cartography; Operations management","score_opus":0.01118526872841732,"score_gpt":0.2001879219254669,"score_spread":0.18900265319704956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786387705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8190388,0.0009210096,0.1788023,0.000024013762,0.00080845435,0.00005610971,0.0000025859106,0.000019964762,0.00032676096],"genre_scores_gemma":[0.99213606,0.0000023165408,0.0076796664,0.000006711709,0.00015625647,9.302094e-7,7.2256535e-7,0.00001649078,8.331177e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993682,0.000009209968,0.00032533988,0.000062457235,0.00007753065,0.00015728502],"domain_scores_gemma":[0.999555,0.00002411169,0.00007803463,0.000058821213,0.00015013143,0.00013393578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015697553,0.00009644992,0.00015144424,0.00067587994,0.000034563916,0.000026975851,0.00005575149,0.00007249581,0.000020352041],"category_scores_gemma":[0.00007285572,0.0001065914,0.000023761067,0.0003154568,0.00006583247,0.00018568787,0.000001852711,0.00016879692,2.4767496e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000492075,0.0000016430811,0.016300304,0.00014561793,0.000026264643,0.000011389209,0.000965005,0.96643686,0.013304464,0.0006364211,0.000014862025,0.002152238],"study_design_scores_gemma":[0.0004709318,0.00005647545,0.007339185,0.001336546,0.000018788714,0.0002525671,0.00052273483,0.97899705,0.0104252,0.000062842635,0.00032666652,0.00019100503],"about_ca_topic_score_codex":0.000429781,"about_ca_topic_score_gemma":0.012718346,"teacher_disagreement_score":0.17309727,"about_ca_system_score_codex":0.00012339526,"about_ca_system_score_gemma":0.00033738845,"threshold_uncertainty_score":0.7097135},"labels":[],"label_agreement":null},{"id":"W2789648104","doi":"10.1080/15623599.2017.1411458","title":"A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings","year":2018,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer Aided Design; Engineering; Automation; Software; Manufacturing engineering; Building information modeling; CAD; Engineering drawing; Construction engineering; Systems engineering; Architectural engineering; Computer science; Mechanical engineering; Operations management; Scheduling (production processes)","score_opus":0.011479142267023464,"score_gpt":0.24176380262227326,"score_spread":0.2302846603552498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2789648104","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25333118,0.000023343615,0.74516946,0.0000764527,0.0010876149,0.00020007193,0.000007911449,0.00001490485,0.00008904344],"genre_scores_gemma":[0.7382696,0.000017268943,0.2614928,0.00000782806,0.00018427212,0.000010728659,0.000002307909,0.000008067415,0.0000070958677],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99903715,0.000016321137,0.0005489403,0.00008017265,0.00024106698,0.00007637856],"domain_scores_gemma":[0.99891526,0.00007054183,0.00039314607,0.000054823064,0.00054176827,0.000024443918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031160997,0.000085217056,0.00014455158,0.0004297218,0.000036452333,0.00003549703,0.0001165334,0.000043326294,0.000022661643],"category_scores_gemma":[0.00002750194,0.00008641964,0.00008981669,0.000052260046,0.00008457678,0.00023257757,0.000011828145,0.000043527096,2.6795857e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010533457,0.0000585897,0.00043220946,0.00068637094,0.0016328004,0.0000030435494,0.0004812804,0.11826773,0.10586095,0.07813593,0.0003691355,0.6930186],"study_design_scores_gemma":[0.0027935577,0.00028388397,0.0016126877,0.00040662903,0.00018069688,0.00008893087,0.00043094385,0.19619769,0.77862227,0.016714677,0.0025094866,0.00015852734],"about_ca_topic_score_codex":0.00000201264,"about_ca_topic_score_gemma":5.798698e-7,"teacher_disagreement_score":0.69286007,"about_ca_system_score_codex":0.000057403246,"about_ca_system_score_gemma":0.000016405545,"threshold_uncertainty_score":0.35240906},"labels":[],"label_agreement":null},{"id":"W2790301752","doi":"10.1061/9780784414866.ch05","title":"Formalizing a Construction Planning Framework to Facilitate Construction-Centric BIM Education and Practical Application","year":2018,"lang":"en","type":"book-chapter","venue":"American Society of Civil Engineers eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Computer science; Construction engineering; Process management; Engineering management; Systems engineering; Knowledge management; Engineering; Operations management","score_opus":0.01621837524170043,"score_gpt":0.24156205605327888,"score_spread":0.22534368081157846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790301752","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023876473,0.0004886317,0.8595514,0.00014789823,0.0011175781,0.00070515944,0.000077520126,0.0005087629,0.13501535],"genre_scores_gemma":[0.25016773,0.0009675309,0.72867554,0.0008849995,0.0021701732,0.0004243111,0.00025167334,0.00044012716,0.01601793],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984777,0.0000122387055,0.00054174964,0.0003835826,0.00030751765,0.00027720374],"domain_scores_gemma":[0.9988327,0.00013019165,0.00029024848,0.00030754122,0.00024832622,0.00019099643],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012487997,0.00041357192,0.00047950906,0.00023941234,0.00011738413,0.000047642923,0.00008495644,0.00034932297,0.000064984044],"category_scores_gemma":[0.00002470564,0.00048233947,0.00019547527,0.000121489706,0.0007463117,0.00013245629,0.000032895703,0.00054681534,0.000019724434],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054352393,0.00002168455,0.0001827641,0.00076989597,0.0007213811,9.647569e-7,0.009084522,0.0015718564,0.0010208612,0.31571767,0.021296872,0.6495572],"study_design_scores_gemma":[0.0007218201,0.0005284889,0.00016722018,0.0019620424,0.00069687294,0.0007812053,0.021555604,0.026089633,0.0013537405,0.05856909,0.8848964,0.0026778784],"about_ca_topic_score_codex":0.000027804192,"about_ca_topic_score_gemma":0.000007228845,"teacher_disagreement_score":0.86359954,"about_ca_system_score_codex":0.00020243677,"about_ca_system_score_gemma":0.00016584463,"threshold_uncertainty_score":0.99976283},"labels":[],"label_agreement":null},{"id":"W2791664214","doi":"10.14428/rcompro.vi3.513","title":"La communication organisationnelle et numérique : formation en mutation, profession en construction","year":2016,"lang":"fr","type":"article","venue":"Revue Communication & professionnalisation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Musée de la Civilisation","funders":"","keywords":"Philosophy; Sociology; Political science","score_opus":0.014896528911770516,"score_gpt":0.26908908853448343,"score_spread":0.2541925596227129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791664214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14210191,0.00949488,0.68897074,0.13762215,0.0038864447,0.0026477398,0.00014028461,0.0013059124,0.013829948],"genre_scores_gemma":[0.9393732,0.01635194,0.037394967,0.00018099006,0.0003598609,0.0005769776,0.0010134333,0.0001445806,0.004604063],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9877143,0.009015388,0.001731915,0.0005369968,0.00052610075,0.00047528805],"domain_scores_gemma":[0.9934758,0.0024145027,0.0010916581,0.0018144328,0.0010013698,0.00020223566],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0040165843,0.00060051936,0.00050041924,0.0005237231,0.0010062798,0.00023635701,0.00080880546,0.0012985887,0.0012998012],"category_scores_gemma":[0.00105064,0.0005526695,0.00020565174,0.00086738775,0.00048069027,0.0045956564,0.00028095994,0.0012157477,0.00056812575],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000090475296,0.00022271514,0.001949825,0.0008149725,0.00011257177,0.000002364542,0.048641775,0.0007962371,0.016581077,0.5450493,0.0050947163,0.380644],"study_design_scores_gemma":[0.009484417,0.00032748713,0.042670805,0.040487573,0.00057635683,0.002235321,0.1166818,0.052140318,0.06505977,0.45128742,0.21491608,0.0041326415],"about_ca_topic_score_codex":0.00015514968,"about_ca_topic_score_gemma":0.0004391388,"teacher_disagreement_score":0.79727125,"about_ca_system_score_codex":0.001887165,"about_ca_system_score_gemma":0.00033213536,"threshold_uncertainty_score":0.9999979},"labels":[],"label_agreement":null},{"id":"W2792045066","doi":"10.1680/jmaen.2017.25","title":"Briefing: Design and construction of Canary Wharf temporary floating road, London, UK","year":2017,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Maritime Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wharf; Modular design; Constructability; Engineering; Deck; Civil engineering; Truck; Transport engineering; Marine engineering; Structural engineering; Computer science","score_opus":0.008119535470759632,"score_gpt":0.1807588723347878,"score_spread":0.17263933686402816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792045066","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9249492,0.0011700917,0.06345222,0.00014891496,0.0016776813,0.0005907112,0.000030368275,0.00027919447,0.0077016074],"genre_scores_gemma":[0.9864449,0.0001160107,0.013301104,0.0000032036373,0.00007158358,0.000011500688,0.000002055797,0.000027447579,0.00002219142],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886733,0.0000036233766,0.0005236487,0.00016679984,0.00024617967,0.00019238913],"domain_scores_gemma":[0.99921083,0.000029091243,0.00027928106,0.00018530953,0.00023020369,0.00006527677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002665409,0.00022519719,0.00033455863,0.00021884248,0.00014457387,0.000051232997,0.00030178812,0.0001493652,0.000014690959],"category_scores_gemma":[0.00026103685,0.00022060776,0.000095121475,0.00017898506,0.00026460685,0.0006461872,0.00007321636,0.00024269496,2.8302705e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008839956,0.000048142847,0.020841539,0.0040303143,0.0005122617,0.0000021352378,0.000823642,0.44941643,0.40662464,0.093654126,0.0010339003,0.022924455],"study_design_scores_gemma":[0.0010069016,0.00007492416,0.016376201,0.001689004,0.00013568815,0.0001629362,0.00030097412,0.6586792,0.31953993,0.0007790011,0.00070942123,0.0005458409],"about_ca_topic_score_codex":0.00019285732,"about_ca_topic_score_gemma":0.000009143562,"teacher_disagreement_score":0.20926274,"about_ca_system_score_codex":0.000062180676,"about_ca_system_score_gemma":0.000048832582,"threshold_uncertainty_score":0.89961237},"labels":[],"label_agreement":null},{"id":"W2792975990","doi":"","title":"Building information modelling demystified: Does it make business sense to adopt BIM","year":2008,"lang":"en","type":"article","venue":"RMIT Research Repository (RMIT University Library)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Documentation; Engineering; Process (computing); Architecture; Construction industry; Engineering management; Process management; Knowledge management; Construction engineering; Computer science; Operations management","score_opus":0.02306894783828476,"score_gpt":0.21157856944156037,"score_spread":0.1885096216032756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792975990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83855903,0.00004950962,0.11428309,0.0006916196,0.00066126254,0.0003559089,0.000017132144,0.0007269889,0.044655446],"genre_scores_gemma":[0.98177993,0.00016864878,0.010161392,0.000045522494,0.00023923087,0.0000038537078,0.000020804244,0.000029033725,0.007551554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984507,0.000116172996,0.00025292352,0.00023606776,0.00052337645,0.00042077145],"domain_scores_gemma":[0.9989765,0.000096097574,0.000038633083,0.00032769778,0.0003022962,0.0002587173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013387087,0.0001783381,0.0001672452,0.000834829,0.0007494843,0.00018196343,0.0002854826,0.00018339131,0.000042620486],"category_scores_gemma":[0.000024353747,0.00017816534,0.00007084363,0.0012999169,0.00012234741,0.002838754,0.00013639162,0.0004761638,0.00008882854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083116646,0.00015327391,0.009965044,0.0009152243,0.0003787257,0.0017806828,0.005631009,0.7378167,0.018969102,0.09463351,0.09984499,0.029080572],"study_design_scores_gemma":[0.0008915071,0.000087518674,0.0044351025,0.00033338318,0.000033659642,0.0003648288,0.002951877,0.21299477,0.06533805,0.00053339306,0.7111122,0.00092367857],"about_ca_topic_score_codex":0.00023307558,"about_ca_topic_score_gemma":0.000015203236,"teacher_disagreement_score":0.6112672,"about_ca_system_score_codex":0.0001941257,"about_ca_system_score_gemma":0.00017551835,"threshold_uncertainty_score":0.72653717},"labels":[],"label_agreement":null},{"id":"W2794251541","doi":"10.6028/nist.bss.180","title":"Database-assisted design for wind :","year":2006,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Standards and Technology; Università degli Studi di Perugia; Concordia University; Florida Institute of Technology; Johns Hopkins University","keywords":"Database; Computer science; Environmental science","score_opus":0.058262075025438294,"score_gpt":0.2650594403282623,"score_spread":0.206797365302824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794251541","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000018597537,0.0004875626,0.70399547,0.000008891521,0.0022139065,0.00030680004,0.00015910028,0.00039824907,0.29241145],"genre_scores_gemma":[0.052362323,0.0018954177,0.39379063,0.00010794477,0.008956448,0.0010316039,0.016619122,0.00077289133,0.5244636],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992754,0.000006550528,0.00025012527,0.00014899118,0.00018815816,0.0001307761],"domain_scores_gemma":[0.9995255,0.000041798627,0.00003963341,0.00019444704,0.00017091069,0.000027712767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013849499,0.0001664997,0.0001817303,0.00009896773,0.000033983015,0.00003614642,0.00006566522,0.00023799611,0.00026172985],"category_scores_gemma":[0.000020269621,0.00015047782,0.00008659664,0.00006885391,0.000012897124,0.00006136489,0.000005005935,0.00013442837,0.000021797314],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025489119,0.000005090046,0.000010095612,0.0001734247,0.000056846686,0.0000011425192,0.0000017034389,0.001197694,0.00040285822,0.00039141267,0.9387736,0.058983613],"study_design_scores_gemma":[0.00013811134,0.00001309813,0.0001629669,0.000068388734,0.00007566027,0.00005986799,0.000007802358,0.008055797,0.0017677014,0.00014076756,0.9892432,0.00026660477],"about_ca_topic_score_codex":0.000104257255,"about_ca_topic_score_gemma":0.00009617813,"teacher_disagreement_score":0.3102048,"about_ca_system_score_codex":0.000145719,"about_ca_system_score_gemma":0.00018178459,"threshold_uncertainty_score":0.6136308},"labels":[],"label_agreement":null},{"id":"W2797021855","doi":"10.29173/mocs51","title":"Prefabrication in the Australian context","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Context (archaeology); Architectural engineering; Engineering; Settlement (finance); Interpretation (philosophy); Product (mathematics); Civil engineering; Construction engineering; Computer science; History; Archaeology; World Wide Web","score_opus":0.013321409691143605,"score_gpt":0.21645898710042966,"score_spread":0.20313757740928606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797021855","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98656553,0.00020768115,0.0009786695,0.0009452073,0.0006018819,0.00030343953,0.0000074302807,0.00014463079,0.010245532],"genre_scores_gemma":[0.99871975,0.00013070056,0.0005951071,0.000058234917,0.00016702476,0.00004962205,0.0000071931454,0.00001511949,0.0002572754],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99913377,0.000008914276,0.00025471865,0.00023501753,0.00016764311,0.00019996041],"domain_scores_gemma":[0.9995292,0.000009944552,0.00010200325,0.00019992895,0.000104869876,0.000054054035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001920669,0.00017210098,0.00015560657,0.00012599207,0.000401691,0.00046137886,0.00022722497,0.00013651306,0.000037771428],"category_scores_gemma":[0.000032010554,0.00014411591,0.000049149385,0.00011214824,0.00023975957,0.0007607234,0.00002113527,0.00025139065,0.000016680819],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036892485,0.000027888658,0.22423874,0.00016497895,0.0000617668,0.0000037085815,0.0018010064,0.00006202863,0.008387779,0.08890515,0.0038393114,0.67247075],"study_design_scores_gemma":[0.0029132843,0.00014074342,0.6474408,0.0003358757,0.00015609505,0.0005193404,0.016020358,0.0277337,0.021195298,0.012816485,0.2694136,0.0013144161],"about_ca_topic_score_codex":0.00007138832,"about_ca_topic_score_gemma":0.00009272413,"teacher_disagreement_score":0.67115635,"about_ca_system_score_codex":0.000045960278,"about_ca_system_score_gemma":0.000010033958,"threshold_uncertainty_score":0.5876877},"labels":[],"label_agreement":null},{"id":"W2800225083","doi":"10.7939/r3154dt9g","title":"Developing and Optimizing Context-Specific and Universal Construction Labour Productivity Models","year":2015,"lang":"en","type":"article","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Context (archaeology); Computer science; Economics; Risk analysis (engineering); Labour economics; Business; Economic growth; Geology","score_opus":0.01542777285286997,"score_gpt":0.15909950938828876,"score_spread":0.1436717365354188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800225083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96934617,0.00044037553,0.019259356,0.00049300224,0.00016296876,0.00007405337,0.0000034242846,0.0000936745,0.010126994],"genre_scores_gemma":[0.97812575,0.00029950246,0.020993717,0.000008976471,0.000022502845,5.898432e-8,0.0000065306604,0.000008251582,0.0005346962],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968237,0.00001671708,0.000058616162,0.00012041029,0.000049423903,0.00007245189],"domain_scores_gemma":[0.9997933,0.000022451914,0.000025119907,0.000065462315,0.000030457306,0.00006323861],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002187227,0.00007406334,0.00010098725,0.000084811174,0.0000596204,0.000019914001,0.0000460871,0.00005681087,0.000019990253],"category_scores_gemma":[0.0000026140501,0.000090573245,0.000012763398,0.00009748651,0.00014610143,0.0013873149,0.00004023915,0.000072071234,0.0000012395943],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011742684,0.000010628602,0.0053338674,0.000086791406,0.00008081429,0.0000059872846,0.010312652,0.0026542442,0.00045949456,0.92623526,0.0016222682,0.053080548],"study_design_scores_gemma":[0.010197836,0.00035399487,0.012540759,0.0007010539,0.00019813154,0.0007523674,0.21367277,0.21087041,0.029425824,0.0939202,0.42450666,0.0028599843],"about_ca_topic_score_codex":0.00017317249,"about_ca_topic_score_gemma":0.000055119934,"teacher_disagreement_score":0.8323151,"about_ca_system_score_codex":0.000021332691,"about_ca_system_score_gemma":0.000049427796,"threshold_uncertainty_score":0.36934698},"labels":[],"label_agreement":null},{"id":"W2800605709","doi":"10.1155/2018/5802918","title":"Context Adaptation of Fuzzy Inference System-Based Construction Labor Productivity Models","year":2018,"lang":"en","type":"article","venue":"Advances in Fuzzy Systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Context (archaeology); Computer science; Fuzzy logic; Adaptation (eye); Inference; Machine learning; Artificial intelligence; Industrial engineering; Data mining; Engineering","score_opus":0.014444037182669164,"score_gpt":0.23507153452697405,"score_spread":0.22062749734430487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800605709","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6491761,0.006953976,0.30171803,0.00002804188,0.008999392,0.0010399257,0.00009390374,0.0006125699,0.03137801],"genre_scores_gemma":[0.99804735,0.000060204788,0.001494997,0.0000033070974,0.00023321428,0.000113278824,0.000010381439,0.000017875836,0.000019372863],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987923,0.00008714508,0.0004993228,0.00022982826,0.00021688727,0.00017451982],"domain_scores_gemma":[0.999124,0.00006647948,0.00016589358,0.00025301808,0.00035270432,0.000037938607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002118951,0.00016236462,0.00028026258,0.00019247572,0.000052932322,0.000026139665,0.00010343517,0.00010509963,0.0000029038583],"category_scores_gemma":[0.000040926883,0.0001597187,0.000033972057,0.0004316109,0.0001939496,0.00087136484,0.000006889424,0.000105108986,0.000010803684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057720128,0.000025622656,0.004260102,0.0010873218,0.00002252472,0.0000012796187,0.0006255013,0.6340669,0.001664292,0.26252294,0.000022570139,0.095643274],"study_design_scores_gemma":[0.000826991,0.0001449262,0.00029017366,0.0009807999,0.000020601241,0.00003395919,0.006786284,0.97355485,0.011197517,0.0027778887,0.0030240228,0.0003619909],"about_ca_topic_score_codex":0.0002241163,"about_ca_topic_score_gemma":0.0007540057,"teacher_disagreement_score":0.34887123,"about_ca_system_score_codex":0.00015500197,"about_ca_system_score_gemma":0.000059707043,"threshold_uncertainty_score":0.65131396},"labels":[],"label_agreement":null},{"id":"W2801128291","doi":"10.1016/j.buildenv.2018.04.019","title":"Life cycle sustainability performance assessment framework for residential modular buildings: Aggregated sustainability indices","year":2018,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Multiple-criteria decision analysis; Process (computing); Life-cycle assessment; ELECTRE; Engineering; Computer science; Operations research; Economics","score_opus":0.005157188246402178,"score_gpt":0.2363628578111186,"score_spread":0.23120566956471642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801128291","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7185206,0.00017887865,0.28025845,0.00030011238,0.0002239401,0.0003334946,0.0000050735034,0.000120472636,0.000059035738],"genre_scores_gemma":[0.98149806,0.00017997935,0.017817013,0.000039684463,0.00026598573,0.00014066046,0.0000056661247,0.000024121702,0.00002880673],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988341,0.000030224306,0.00028084,0.00034020026,0.00018277846,0.00033189595],"domain_scores_gemma":[0.9993954,0.000057435787,0.00006314843,0.00026652092,0.00006129296,0.00015622193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003559861,0.00018972371,0.0001764392,0.00007451823,0.00033324235,0.00008488603,0.000108886365,0.00015512476,0.000069190784],"category_scores_gemma":[0.00014940927,0.00018836359,0.000054526008,0.00008721156,0.00023455718,0.00021670408,0.000055263557,0.0001841592,0.0000022743297],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030608408,0.0002867961,0.11655041,0.0020958683,0.00038275792,0.000004229609,0.002554573,0.16917813,0.0044717956,0.09472405,0.0010977815,0.60834754],"study_design_scores_gemma":[0.0017697746,0.00091921946,0.25545064,0.00022936714,0.00020298759,0.000016901819,0.004062173,0.42389974,0.015939388,0.24857932,0.04750437,0.0014261281],"about_ca_topic_score_codex":0.00003372101,"about_ca_topic_score_gemma":0.000002126157,"teacher_disagreement_score":0.6069214,"about_ca_system_score_codex":0.0004922419,"about_ca_system_score_gemma":0.00005868485,"threshold_uncertainty_score":0.7681244},"labels":[],"label_agreement":null},{"id":"W2801749318","doi":"10.7939/r3wd3q64h","title":"A Conceptual Cost Comparison Study between Alberta and Overseas Module Assembly Strategies for Industrial Construction Projects","year":2016,"lang":"en","type":"article","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construction engineering; Computer science; Engineering; Operations management; Engineering management; Engineering drawing; Business","score_opus":0.029883102563609033,"score_gpt":0.2113735887995482,"score_spread":0.18149048623593916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801749318","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98750573,0.0000139938675,0.0028576418,0.00015447188,0.00020722614,0.0005709395,0.00003085835,0.00006960065,0.008589553],"genre_scores_gemma":[0.99859047,0.000007444243,0.00047408047,0.00000337548,0.00008475157,0.0000016024945,0.00002567123,0.000012255792,0.0008003577],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9994426,0.000034660705,0.00014244563,0.00016909107,0.000082600534,0.00012861584],"domain_scores_gemma":[0.99945354,0.0002801419,0.00006676327,0.000107823194,0.000025494108,0.00006623621],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025145782,0.00012062552,0.00020998507,0.00009587395,0.00008499469,0.00003185518,0.00009894523,0.00012537884,0.00010853205],"category_scores_gemma":[0.0000135221835,0.00011270025,0.000042872656,0.00009832134,0.00019826983,0.0011709156,0.000033547214,0.00007910085,0.0000034697478],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052636734,0.00013905173,0.7859698,0.000059636524,0.0005795914,0.0000021058663,0.013850847,0.00018643074,0.0009412085,0.13799435,0.01490331,0.044847306],"study_design_scores_gemma":[0.041078288,0.0038031677,0.10820046,0.0006984866,0.0011974149,0.000037708058,0.4815762,0.0121143125,0.016871165,0.0040671723,0.32754993,0.002805671],"about_ca_topic_score_codex":0.00079681125,"about_ca_topic_score_gemma":0.00070549623,"teacher_disagreement_score":0.67776936,"about_ca_system_score_codex":0.000022431477,"about_ca_system_score_gemma":0.00008513615,"threshold_uncertainty_score":0.45957828},"labels":[],"label_agreement":null},{"id":"W2801904618","doi":"10.1080/15623599.2018.1462446","title":"Framework for target cost modelling in construction projects","year":2018,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Activity-based costing; Computer science; Compatibility (geochemistry); Target costing; Cost estimate; Project management; Intuition; Construction management; Earned value management; Simulated annealing; Process (computing); Project planning; Systems engineering; Operations research; Risk analysis (engineering); Engineering","score_opus":0.0204039321566213,"score_gpt":0.26796112155436264,"score_spread":0.24755718939774135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801904618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026203781,0.000068140085,0.95943594,0.00023677791,0.009121052,0.00027826766,0.00000955868,0.00005045975,0.0045960266],"genre_scores_gemma":[0.5906077,0.00014275641,0.40818074,0.000046972462,0.00094896066,0.000025915011,0.0000052449186,0.000015390566,0.000026278954],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99878323,0.000019078057,0.0006054324,0.00012225345,0.0003213936,0.00014861325],"domain_scores_gemma":[0.9990473,0.000038457714,0.00022201777,0.00008684147,0.0005603849,0.00004499398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022919645,0.00012759925,0.00015479128,0.00061534956,0.00004586056,0.00008975962,0.00020058156,0.000086758,0.00012174674],"category_scores_gemma":[0.000022491471,0.00013054791,0.000093913666,0.00019704328,0.00012802242,0.000388689,0.000016471733,0.00018536717,0.000009483363],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000260763,0.000036255926,0.002852969,0.00004863017,0.00040714926,0.000013351168,0.0002995772,0.07783407,0.00016248343,0.57158905,0.00072845945,0.34576723],"study_design_scores_gemma":[0.004191757,0.00026686312,0.0011556331,0.00089410157,0.00011931913,0.0013327785,0.004999407,0.39953429,0.010836182,0.453495,0.122499466,0.0006752075],"about_ca_topic_score_codex":0.0000024258434,"about_ca_topic_score_gemma":0.0000039024144,"teacher_disagreement_score":0.56440395,"about_ca_system_score_codex":0.00023059054,"about_ca_system_score_gemma":0.00002981448,"threshold_uncertainty_score":0.53235894},"labels":[],"label_agreement":null},{"id":"W2802224221","doi":"10.7939/r39h5q","title":"New Quantitative Methods for Planning Earthwork Operations","year":2014,"lang":"en","type":"article","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earthworks; Computer science; Geography; Cartography","score_opus":0.013698036902936434,"score_gpt":0.23706472570702877,"score_spread":0.22336668880409233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802224221","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016996285,0.00007633803,0.9499809,0.00023660412,0.00017242075,0.00006718875,0.0000016603816,0.00007115425,0.032397464],"genre_scores_gemma":[0.06461854,0.000010132277,0.92855126,0.000030780677,0.000044961573,2.0321667e-7,0.000033269793,0.000010976454,0.0066998648],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997842,0.000022326827,0.00005378958,0.00006242194,0.000020280728,0.000057032055],"domain_scores_gemma":[0.9996846,0.00018976809,0.000010986863,0.00006612413,0.000010830468,0.00003771376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002296416,0.000047447164,0.0000751806,0.000056155004,0.000062643,0.000011851967,0.000071186805,0.000041881965,0.00025853014],"category_scores_gemma":[0.000013702471,0.00005554798,0.000039985352,0.000081108585,0.000019011693,0.00041037687,0.000010159921,0.00004226517,0.000008549428],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008101182,0.00001231914,0.0015829904,0.00005924592,0.00014925752,3.0306924e-7,0.014287058,0.06322007,0.002372047,0.75756353,0.045538798,0.11513337],"study_design_scores_gemma":[0.00069038017,0.0001188922,0.0014252848,0.00007323671,0.000044478114,0.0000023523771,0.0031712034,0.41044274,0.009069765,0.0050655217,0.5696523,0.00024381276],"about_ca_topic_score_codex":0.00009282129,"about_ca_topic_score_gemma":0.00004609302,"teacher_disagreement_score":0.75249803,"about_ca_system_score_codex":0.000003576496,"about_ca_system_score_gemma":0.000020325979,"threshold_uncertainty_score":0.28307238},"labels":[],"label_agreement":null},{"id":"W2803759846","doi":"","title":"Experience In Geotechnical Design Of Overseas Port Facilities","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Port (circuit theory); Civil engineering; Engineering; Geotechnical engineering","score_opus":0.014523629252375289,"score_gpt":0.23321004721342137,"score_spread":0.21868641796104607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803759846","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85374904,0.00008700899,0.021183737,0.00020888964,0.0010206194,0.00017812352,0.000040522347,0.00021031681,0.12332174],"genre_scores_gemma":[0.99803126,0.00008884916,0.00036709508,0.000019621459,0.000044708126,0.000028945646,0.000006757307,0.00000599505,0.0014067605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943477,0.000009177742,0.00021611158,0.00009050017,0.00016619626,0.000083261846],"domain_scores_gemma":[0.999831,0.000019817124,0.000014944404,0.00008003611,0.000033114513,0.000021059537],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004734522,0.00006869224,0.00007394602,0.00005387261,0.000010169421,0.000012776686,0.0001238523,0.000056321012,0.0020871926],"category_scores_gemma":[0.0000063887674,0.000071111055,0.000031618652,0.00006975527,0.000048496317,0.00016679948,0.0000065228032,0.000077081306,0.000028804156],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018669185,0.00013478813,0.009052841,0.00004149392,0.000085833395,0.000021921054,0.0037466183,0.8109647,0.076488174,0.041003443,0.0020492426,0.05622424],"study_design_scores_gemma":[0.0017362442,0.00015867117,0.021337027,0.00021584051,0.000015970838,0.00019350272,0.0018128601,0.563451,0.110190526,0.004576702,0.29538834,0.00092334225],"about_ca_topic_score_codex":0.00008158441,"about_ca_topic_score_gemma":0.000009209463,"teacher_disagreement_score":0.2933391,"about_ca_system_score_codex":0.00006676249,"about_ca_system_score_gemma":0.0000102895165,"threshold_uncertainty_score":0.998825},"labels":[],"label_agreement":null},{"id":"W2804574988","doi":"10.1080/24751448.2017.1354625","title":"Disrupting the Status Quo with Early-Stage BIM-Based Energy Modeling","year":2017,"lang":"en","type":"article","venue":"Technology|Architecture + Design","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Schematic; Building information modeling; Status quo; Process (computing); Computer science; Systems engineering; Software; Fidelity; Conceptual design; Engineering design process; Energy (signal processing); Engineering; Software engineering; Human–computer interaction; Operations management; Mechanical engineering","score_opus":0.01409326529873526,"score_gpt":0.21438712174826352,"score_spread":0.20029385644952827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804574988","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.102111675,0.00026609038,0.8944169,0.0006536747,0.0001521856,0.00016932261,0.000007295998,0.0011439369,0.0010789018],"genre_scores_gemma":[0.9729842,0.000021257241,0.02666767,0.00004603003,0.00006806977,0.00009371095,0.0000032967343,0.000051201627,0.00006458615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988676,0.000032645443,0.00018915244,0.0002534556,0.00016779834,0.0004893753],"domain_scores_gemma":[0.9988794,0.000050551836,0.000084405685,0.0008677115,0.000057525805,0.0000604352],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012293989,0.00024947143,0.00018108534,0.00024662685,0.0006287553,0.00015634253,0.0005123209,0.00025276482,0.000022464872],"category_scores_gemma":[0.00006123061,0.00016160047,0.0000497556,0.00020169989,0.00030695775,0.00009486265,0.000038362257,0.0005661719,0.000007836315],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056426714,0.000010267668,0.0011041224,0.000021113508,0.000072849645,0.000015923833,0.00016757156,0.7689197,0.0067704497,0.024472976,0.00003909043,0.19834952],"study_design_scores_gemma":[0.00069475133,0.00016665761,0.00022461463,0.000096155134,0.00004845482,0.00004974439,0.00026934603,0.9374394,0.042442337,0.013752512,0.0043322854,0.00048377443],"about_ca_topic_score_codex":0.0001484916,"about_ca_topic_score_gemma":0.0002383065,"teacher_disagreement_score":0.8708725,"about_ca_system_score_codex":0.000059229566,"about_ca_system_score_gemma":0.000057302026,"threshold_uncertainty_score":0.65898764},"labels":[],"label_agreement":null},{"id":"W2804760574","doi":"10.29173/mocs2","title":"A comparison between Volumetric Timber Manufacturing Strategies in the UK and mainland Europe","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Strathclyde","keywords":"Context (archaeology); Variety (cybernetics); Flexibility (engineering); Productivity; Prefabrication; Mainland; Production (economics); Quality (philosophy); Factory (object-oriented programming); Greenhouse gas; Legislation; Engineering; Business; Architectural engineering; Environmental economics; Operations management; Civil engineering; Computer science; Economics","score_opus":0.011403069545361544,"score_gpt":0.21569144283581632,"score_spread":0.20428837329045477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804760574","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9886587,0.00044222682,0.006965843,0.00014258451,0.00018858933,0.00018269818,0.000008043159,0.00011630599,0.003294978],"genre_scores_gemma":[0.9984866,0.00024470815,0.000957289,0.000018713481,0.00015673945,0.000017099268,0.000004205319,0.000019091718,0.000095596384],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9989788,0.000016873275,0.00031377576,0.00027065838,0.00017899166,0.00024090805],"domain_scores_gemma":[0.99966514,0.00004632205,0.000064724496,0.00008598649,0.00007047175,0.00006733691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020147668,0.00021150024,0.00023512806,0.00028558637,0.00014129448,0.0002748512,0.00009881162,0.00012319432,0.000038241702],"category_scores_gemma":[0.000016933933,0.00014168459,0.00003305781,0.00031154818,0.00018458217,0.00050838105,0.00002749967,0.00021381784,0.000010126859],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016109801,0.0000069017883,0.8054867,0.00008172508,0.000042990257,0.0000022248912,0.0004359879,0.00004117975,0.0019920412,0.005597066,0.0005012518,0.18579586],"study_design_scores_gemma":[0.0019006375,0.00012797452,0.93572986,0.0002579015,0.0001253137,0.00025490197,0.005457384,0.0045358604,0.010204884,0.003992855,0.036607396,0.0008050347],"about_ca_topic_score_codex":0.00002268341,"about_ca_topic_score_gemma":0.000031832475,"teacher_disagreement_score":0.18499082,"about_ca_system_score_codex":0.000034279357,"about_ca_system_score_gemma":0.000010184583,"threshold_uncertainty_score":0.577773},"labels":[],"label_agreement":null},{"id":"W2805325611","doi":"10.1061/(asce)la.1943-4170.0000267","title":"Visualization of Delay Claim Analysis Using 4D Simulation","year":2018,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Critical path method; Context (archaeology); Computer science; Visualization; Schedule; Path (computing); Operations research; Data mining; Systems engineering; Engineering","score_opus":0.006555455917501233,"score_gpt":0.23057001709491212,"score_spread":0.2240145611774109,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2805325611","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52716714,0.00049449684,0.47190353,0.000005201994,0.00029754636,0.00002551486,0.0000019188897,0.000016453549,0.000088165405],"genre_scores_gemma":[0.9908706,0.000111460584,0.008850219,0.0000012757911,0.00015338356,6.522782e-7,0.0000022222573,0.000008341796,0.0000018230096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999198,0.000019378922,0.00046601717,0.00008413142,0.0001326863,0.00009978466],"domain_scores_gemma":[0.9995561,0.000026960499,0.00014655487,0.00005208391,0.00016730023,0.0000509894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016468059,0.000102074824,0.00021379844,0.00063374866,0.000051551357,0.00004306436,0.000026898233,0.00009233618,0.000006989691],"category_scores_gemma":[0.000022876355,0.00010012694,0.000060251557,0.000584333,0.000095054136,0.00039946297,0.0000074731965,0.000105903004,8.989404e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004504759,0.000011238178,0.006673459,0.000074785734,0.00015595743,0.0000016479731,0.00024470445,0.95541614,0.0035850268,0.018276863,0.0000029647401,0.015512187],"study_design_scores_gemma":[0.00030423154,0.00006371687,0.0040812087,0.000081208964,0.00013904535,0.00012787685,0.00038651953,0.99372447,0.0007162291,0.00012579375,0.00015334383,0.00009638428],"about_ca_topic_score_codex":0.000019667497,"about_ca_topic_score_gemma":0.000016405003,"teacher_disagreement_score":0.46370345,"about_ca_system_score_codex":0.000057161207,"about_ca_system_score_gemma":0.000019730505,"threshold_uncertainty_score":0.40830582},"labels":[],"label_agreement":null},{"id":"W2805339209","doi":"10.11159/iccste18.137","title":"Design Optimization of Building Structures Using a Metamodeling Method","year":2018,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Metamodeling; Computer science; Software engineering","score_opus":0.027119365001486415,"score_gpt":0.25375788998607973,"score_spread":0.2266385249845933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2805339209","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52134204,0.00002574919,0.4777797,0.000030281903,0.00044686624,0.00010983391,0.00001689255,0.000052366824,0.0001962903],"genre_scores_gemma":[0.88323736,0.000015708927,0.116652526,0.0000061935234,0.00006253647,0.0000043325185,0.0000037584875,0.00001390452,0.0000036568772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992027,0.0000029656205,0.0003229916,0.00013951292,0.00023266267,0.000099163844],"domain_scores_gemma":[0.99937034,0.000020496009,0.00012614607,0.000041998264,0.00041293466,0.000028072738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009243886,0.00014659588,0.0001530303,0.00014562001,0.000052985968,0.000035815643,0.00017418034,0.000062145824,0.000059903316],"category_scores_gemma":[0.000017578139,0.0001158461,0.000045738037,0.00015835803,0.000049623068,0.00027917654,0.0000067362284,0.00011359702,6.888718e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021760967,0.0000013763608,0.00021516184,0.000053444048,0.000059346403,3.7616292e-8,0.00028461847,0.6855381,0.24107665,0.071700096,0.0000021417559,0.0010472268],"study_design_scores_gemma":[0.00013718756,0.000020099875,0.00090300496,0.000098180644,0.000031737203,0.0000060686166,0.00008667037,0.8159798,0.17973994,0.002896794,0.000004681919,0.00009588488],"about_ca_topic_score_codex":0.000018226267,"about_ca_topic_score_gemma":0.000004119704,"teacher_disagreement_score":0.36189535,"about_ca_system_score_codex":0.000026980355,"about_ca_system_score_gemma":0.000013390936,"threshold_uncertainty_score":0.4724067},"labels":[],"label_agreement":null},{"id":"W2807801518","doi":"10.14288/1.0365783","title":"Quality control and quality assurance in hybrid mass timber high-rise construction : a case study of the Brock Commons","year":2018,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Quality (philosophy); Quality assurance; Control (management); Business; Operations management; Engineering; Environmental science; Economics; Service (business); Marketing; Management","score_opus":0.008679589358911855,"score_gpt":0.1925286385221926,"score_spread":0.18384904916328074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807801518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99662125,0.00003852078,0.0021693166,0.000015840804,0.0002690979,0.00028475624,0.00016021825,0.00004392856,0.0003970597],"genre_scores_gemma":[0.9997114,0.0000083391515,0.00020869443,0.0000055682626,0.000016793641,0.0000010220924,0.0000013329458,0.000006175969,0.000040668416],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991747,0.00018628297,0.00021160985,0.00017287405,0.00014497567,0.00010951579],"domain_scores_gemma":[0.9994167,0.00007168962,0.00011419071,0.00022039581,0.00013665909,0.000040382296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016540573,0.000042752243,0.00024136667,0.000030854088,0.00014417699,0.000029646717,0.00010471956,0.000059832564,0.000025922987],"category_scores_gemma":[0.000022316319,0.000107511245,0.00004532958,0.0001933634,0.0003755363,0.00019049106,0.00002736606,0.00013498693,0.0000011076085],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032756507,0.00014841434,0.82350147,0.00011229788,0.00009110029,0.00007112827,0.0006529766,0.00017993782,0.0012806279,0.00002415606,0.0005344517,0.17337066],"study_design_scores_gemma":[0.0020504212,0.00005363495,0.9868449,0.00004497278,0.000027130687,0.0003194646,0.009361886,0.0009581784,0.000006997107,0.000199227,0.000022451835,0.00011072738],"about_ca_topic_score_codex":0.18680346,"about_ca_topic_score_gemma":0.7848042,"teacher_disagreement_score":0.59800076,"about_ca_system_score_codex":0.00004878841,"about_ca_system_score_gemma":0.000023590424,"threshold_uncertainty_score":0.8186117},"labels":[],"label_agreement":null},{"id":"W2808239110","doi":"10.1061/(asce)co.1943-7862.0001534","title":"Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Rework; Computer science; Quality (philosophy); Reliability engineering; Markov chain; Cost estimate; Control (management); Decision support system; Systems engineering; Industrial engineering; Engineering; Data mining","score_opus":0.04038355625375099,"score_gpt":0.2943404203671337,"score_spread":0.2539568641133827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808239110","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12575246,0.00006932862,0.8731682,0.000037501908,0.00065474625,0.00020315991,0.000013311162,0.000050908922,0.00005039401],"genre_scores_gemma":[0.8835065,0.00011381029,0.11612972,0.000012908964,0.0002060557,0.000004977351,0.0000049316745,0.000014676508,0.0000064600817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925315,0.000011248103,0.00039040047,0.000112379596,0.000119020195,0.000113772745],"domain_scores_gemma":[0.99951655,0.00004736186,0.00013815955,0.000119403434,0.00012184834,0.000056678058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002996136,0.00011498807,0.00016874365,0.00030508835,0.00008946501,0.0000681115,0.000059133457,0.000059702037,0.0000022163108],"category_scores_gemma":[0.00003171622,0.00011750363,0.000027563472,0.000115964634,0.000031011652,0.000404874,0.000016646043,0.00010278002,2.0618906e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027852182,0.0000031282148,0.0000392884,0.00012296799,0.00010146908,4.3203312e-7,0.000057159177,0.9086657,0.0014939929,0.0036503565,0.000030304256,0.08580734],"study_design_scores_gemma":[0.00078881375,0.000026733785,0.00030699113,0.00011403781,0.00010277118,0.000054592012,0.00009917872,0.99761343,0.00009354057,0.00020676748,0.00047606393,0.00011709156],"about_ca_topic_score_codex":0.0000012748503,"about_ca_topic_score_gemma":0.0000021649169,"teacher_disagreement_score":0.75775397,"about_ca_system_score_codex":0.000047635458,"about_ca_system_score_gemma":0.00000891489,"threshold_uncertainty_score":0.47916588},"labels":[],"label_agreement":null},{"id":"W2808806300","doi":"10.1016/j.jobe.2018.06.010","title":"Energy-based target cost modelling for construction projects","year":2018,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Energy consumption; Activity-based costing; Energy accounting; Process (computing); Reliability engineering; Computer science; Energy (signal processing); Set (abstract data type); Capital cost; Cost estimate; Risk analysis (engineering); Industrial engineering; Efficient energy use; Systems engineering; Operations research; Engineering","score_opus":0.013445565789680267,"score_gpt":0.21118844441778348,"score_spread":0.19774287862810322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808806300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032787997,0.00016170481,0.9646008,0.000021583297,0.0021259745,0.00007110957,0.0000036592794,0.000112598515,0.000114596274],"genre_scores_gemma":[0.701578,0.00000857618,0.2975874,0.00001035643,0.0007751774,0.000008517303,0.0000011752319,0.000025984527,0.0000048115007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993011,0.0000046045507,0.00032265895,0.00007316989,0.00012741935,0.00017109327],"domain_scores_gemma":[0.99949944,0.00004310319,0.00008997652,0.00007145666,0.00023407291,0.00006196923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015071388,0.000121392455,0.0001613361,0.00028047105,0.000051119237,0.00004424136,0.00008221868,0.00007804507,0.000010265241],"category_scores_gemma":[0.000022099666,0.00011931361,0.000082129234,0.00016328027,0.000022366241,0.00021866472,0.0000036735528,0.00012877262,4.997055e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015973632,0.0000040470823,0.000026688198,0.000047193833,0.00003353393,9.928963e-7,0.00003310097,0.94055814,0.043715645,0.0041466863,0.00031207112,0.01110591],"study_design_scores_gemma":[0.00028450263,0.000062738334,0.000002882507,0.00009782277,0.000015842761,0.00006676517,0.000018065823,0.80192894,0.18026914,0.0002957901,0.016851077,0.000106431144],"about_ca_topic_score_codex":0.0000014200937,"about_ca_topic_score_gemma":4.8301325e-7,"teacher_disagreement_score":0.66879,"about_ca_system_score_codex":0.00010375092,"about_ca_system_score_gemma":0.000040855037,"threshold_uncertainty_score":0.48654678},"labels":[],"label_agreement":null},{"id":"W2809473643","doi":"10.1139/cjce-2017-0327","title":"Optimizing planning of build–operate–transfer projects to maximize investor profit","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Profit (economics); Operations research; Schedule; Critical path method; Computer science; Scheduling (production processes); Project management; Operations management; Engineering; Systems engineering; Economics","score_opus":0.013749784649060157,"score_gpt":0.19492939485394714,"score_spread":0.181179610204887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2809473643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73226804,0.0010788059,0.25885728,0.00011344285,0.0026228488,0.00020281668,0.000013402708,0.00007536415,0.0047679725],"genre_scores_gemma":[0.9946876,0.000004844583,0.004839159,0.000035743942,0.00036353106,0.000004690959,7.6504574e-7,0.00003687788,0.000026787817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999149,0.000007883176,0.00036753048,0.00008060579,0.00012027039,0.00027466496],"domain_scores_gemma":[0.9992241,0.000014004751,0.000028227538,0.000106379404,0.00021843523,0.00040882433],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014686877,0.00014476418,0.00021641894,0.0005614223,0.000045089,0.00004434691,0.00015678482,0.000081020364,0.00012451454],"category_scores_gemma":[0.00005572009,0.00014711,0.00006174758,0.0003244539,0.000032459546,0.00022345509,0.0000036871443,0.00022658745,0.000005515072],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017789573,0.0000027005767,0.0017919443,0.0001713457,0.00014699688,0.0000517671,0.00673414,0.9131738,0.071410775,0.0019428122,0.0025447367,0.0020111862],"study_design_scores_gemma":[0.0036910027,0.0017251339,0.013651146,0.0070236586,0.0003126867,0.00231551,0.004168691,0.40877938,0.43349847,0.00024120991,0.12158589,0.00300723],"about_ca_topic_score_codex":0.0001554554,"about_ca_topic_score_gemma":0.0057077482,"teacher_disagreement_score":0.5043944,"about_ca_system_score_codex":0.0001411341,"about_ca_system_score_gemma":0.00027941112,"threshold_uncertainty_score":0.59989715},"labels":[],"label_agreement":null},{"id":"W2810316557","doi":"10.1177/875697280003100406","title":"Resource Optimization in a Design Office Using Simulation","year":2000,"lang":"en","type":"article","venue":"Project Management Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada); University of Waterloo","funders":"","keywords":"Teamwork; Productivity; Computer science; Work (physics); Industrial engineering; Simulation modeling; Resource (disambiguation); Engineering management; Manufacturing engineering; Operations research; Systems engineering; Engineering","score_opus":0.027662595099991225,"score_gpt":0.2522000646184353,"score_spread":0.22453746951844408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810316557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012649839,0.00011423774,0.9592217,0.00001282141,0.00011956017,0.0002537026,3.0915206e-7,0.000096873475,0.027530927],"genre_scores_gemma":[0.8985816,0.0002767609,0.10025318,0.00004758789,0.00016720373,0.000012569424,0.000004585428,0.00003007197,0.0006263958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994107,0.000051864106,0.00021108477,0.00007488481,0.00012612024,0.00012533623],"domain_scores_gemma":[0.99986285,0.000012564936,0.000028480848,0.000060306607,0.00001790152,0.000017925166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020393191,0.00007766517,0.00006231786,0.00027526417,0.00006982005,0.00009300137,0.000058149664,0.000034556968,0.00033841416],"category_scores_gemma":[0.0000034079148,0.0000781113,0.000023385877,0.00032331326,0.0000070766123,0.00024413367,0.0000043981377,0.00012845316,0.000010842175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026629159,0.0000080121345,0.00003608889,0.000010880739,0.000013841673,0.0000055833384,0.00011018175,0.916324,0.000013554548,0.00006663606,0.00014424745,0.08324032],"study_design_scores_gemma":[0.00030964418,0.000011199734,0.00009549429,0.000043642995,0.000014504463,0.00002862049,0.00012030705,0.9932413,0.000024765255,0.00011029398,0.0059156353,0.000084558],"about_ca_topic_score_codex":0.0000037602806,"about_ca_topic_score_gemma":0.000001098827,"teacher_disagreement_score":0.8859318,"about_ca_system_score_codex":0.00012056004,"about_ca_system_score_gemma":0.000008336692,"threshold_uncertainty_score":0.37053975},"labels":[],"label_agreement":null},{"id":"W2822730844","doi":"","title":"Microsoft Project 2013 et exploitation agile","year":2015,"lang":"fr","type":"book","venue":"Loze-Dion éditeur eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Library science; Art; Computer science","score_opus":0.029919820297010617,"score_gpt":0.2543026875978066,"score_spread":0.22438286730079599,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2822730844","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003263726,0.0040033795,0.014851565,0.00083973794,0.013552707,0.0021045955,0.00053391827,0.001416781,0.9594336],"genre_scores_gemma":[0.009596602,0.0005301394,0.011545361,0.000442893,0.003066352,0.0005283187,0.0015456108,0.00045963377,0.9722851],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.996665,0.000287677,0.0009967461,0.00076639577,0.000665247,0.00061894086],"domain_scores_gemma":[0.99789214,0.00015829934,0.0003994743,0.0006660999,0.00063690083,0.00024707004],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00053699245,0.00089739147,0.00070189324,0.0005623981,0.00021535462,0.00029838824,0.00035835212,0.0011379691,0.000470728],"category_scores_gemma":[0.000069886686,0.0009830452,0.00036148122,0.0001346585,0.00029626262,0.0004309021,0.000087487824,0.0012773694,0.0023144148],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000811803,0.000058515132,0.000042364492,0.0008228777,0.00031511163,0.000041734544,0.0031687655,0.0013020386,0.013266084,0.17391208,0.64458066,0.16240858],"study_design_scores_gemma":[0.00082052214,0.00018367688,0.000044719978,0.0007188171,0.00017358799,0.00020678912,0.00035021474,0.0019885458,0.003042845,0.008070479,0.98338985,0.0010099668],"about_ca_topic_score_codex":0.00045212192,"about_ca_topic_score_gemma":0.0006327488,"teacher_disagreement_score":0.33880916,"about_ca_system_score_codex":0.0008113316,"about_ca_system_score_gemma":0.0008910139,"threshold_uncertainty_score":0.999262},"labels":[],"label_agreement":null},{"id":"W2847174986","doi":"10.1139/cjce-2018-0047","title":"A framework for building information modeling implementation in engineering education","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Computer science; Engineering management; Engineering education; Subject (documents); Management science; Engineering; Operations management","score_opus":0.0073114268020109535,"score_gpt":0.2306581101728075,"score_spread":0.22334668337079655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2847174986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07966862,0.0002929491,0.9175184,0.00004341576,0.0021195477,0.000119008124,0.0000056692697,0.000033105447,0.00019929654],"genre_scores_gemma":[0.9763823,0.000009983535,0.023048861,0.000023288894,0.0004918315,0.000017424458,0.0000056201784,0.000019879715,8.198172e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999224,0.0000032006371,0.0004197333,0.000047712674,0.00007847829,0.00022686805],"domain_scores_gemma":[0.9994916,0.000024519162,0.000055421853,0.0000662968,0.00020066148,0.00016152994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018101712,0.0001090858,0.00011982787,0.0008040021,0.000038851034,0.000080498576,0.00009216125,0.00008392689,0.000046874764],"category_scores_gemma":[0.0001060374,0.00012950796,0.00004897588,0.00027395337,0.000006488073,0.0007910408,0.0000020911032,0.00018359059,0.0000019676731],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000035945907,0.0000017331371,0.00038407094,0.00014198653,0.000024587753,6.093965e-7,0.001059291,0.9394912,0.0009458383,0.036608323,0.00026685622,0.021071881],"study_design_scores_gemma":[0.00024325938,0.000038630962,0.00035826402,0.00038174243,0.000013066955,0.00004559371,0.00045642882,0.9881083,0.0011428196,0.0016572385,0.0073711467,0.00018353664],"about_ca_topic_score_codex":0.0002230226,"about_ca_topic_score_gemma":0.011156924,"teacher_disagreement_score":0.8967137,"about_ca_system_score_codex":0.00025995212,"about_ca_system_score_gemma":0.00031157504,"threshold_uncertainty_score":0.62258255},"labels":[],"label_agreement":null},{"id":"W2886644990","doi":"10.1061/9780784481271.062","title":"Chaos and Complexity in Modeling and Detection of Spatial Temporal Clashes in Construction Processes","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Chaotic; Crew; Sensitivity (control systems); Variable (mathematics); Stochastic process; Scheduling (production processes); Stochastic modelling; Mathematical optimization; Simulation; Industrial engineering; Operations research; Artificial intelligence; Mathematics; Engineering","score_opus":0.07628720370253153,"score_gpt":0.31401790003296814,"score_spread":0.2377306963304366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886644990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.985932,0.0003569857,0.011782037,0.00004515453,0.00074075884,0.0003127751,0.000011908217,0.00006899257,0.0007493766],"genre_scores_gemma":[0.99800014,0.000353041,0.0014356853,0.0000022964105,0.00014192908,0.000039315746,0.000004571108,0.00001476637,0.0000082510405],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986421,0.00011992922,0.00041712256,0.0002844974,0.0002674047,0.00026895612],"domain_scores_gemma":[0.99918103,0.00007034433,0.000055709956,0.00013688058,0.0004822886,0.000073736395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046120535,0.00014208398,0.00022683966,0.00070944475,0.00012975748,0.00006526089,0.0000692342,0.0001713032,0.00004431211],"category_scores_gemma":[0.00016071158,0.00015021839,0.000015282076,0.0005695847,0.0018787178,0.00040132657,0.00004296328,0.00036312747,0.0000031743932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005335417,0.00006559066,0.28406206,0.001215069,0.000061967876,0.000006227833,0.0014658837,0.00082814606,0.038842447,0.006717631,0.00005372126,0.6661477],"study_design_scores_gemma":[0.0024255882,0.0003542713,0.027030915,0.000600688,0.000013241505,0.00034964754,0.005143085,0.89004725,0.053288408,0.019666312,0.0005887608,0.0004918117],"about_ca_topic_score_codex":0.0013820291,"about_ca_topic_score_gemma":0.017833218,"teacher_disagreement_score":0.8892191,"about_ca_system_score_codex":0.000093046634,"about_ca_system_score_gemma":0.00008734552,"threshold_uncertainty_score":0.9951354},"labels":[],"label_agreement":null},{"id":"W2886659502","doi":"10.1155/2018/4896748","title":"Simulation and Optimization for Railway Operations Management","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Transport engineering; Engineering; Operations research","score_opus":0.007504623912327204,"score_gpt":0.24323847854805133,"score_spread":0.23573385463572413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886659502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12480656,0.00007240419,0.8743926,0.000028297356,0.00045434549,0.00013199667,0.000005170875,0.000024043287,0.0000845783],"genre_scores_gemma":[0.8216295,0.0000709697,0.1781116,0.000013402828,0.00012433862,0.0000072615444,0.000018624996,0.0000084950725,0.000015763317],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956495,0.0000040017885,0.0002577807,0.0000483015,0.00007332512,0.000051646883],"domain_scores_gemma":[0.99963105,0.000018436946,0.000048942813,0.00003313612,0.0002429484,0.000025461886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000054890035,0.00005577944,0.00006957962,0.000096250056,0.000058970523,0.000017871515,0.00002218471,0.00003008645,0.000021220541],"category_scores_gemma":[0.000005055957,0.00005354475,0.00002802542,0.00008410485,0.00001870642,0.00044371854,2.701006e-7,0.000035356916,4.818073e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032953823,0.000004747808,0.000027511405,0.000023248602,0.000019788406,2.378654e-7,0.0003085642,0.9515263,0.00066376256,0.0018601228,0.0000134985885,0.0455193],"study_design_scores_gemma":[0.0010345138,0.00015755309,0.0042315675,0.000048446414,0.000068696696,0.0000032277128,0.00042643916,0.9888222,0.0016311804,0.00073363364,0.002746326,0.000096195894],"about_ca_topic_score_codex":2.2392321e-7,"about_ca_topic_score_gemma":0.000014153826,"teacher_disagreement_score":0.696823,"about_ca_system_score_codex":0.000020324203,"about_ca_system_score_gemma":0.0000051455168,"threshold_uncertainty_score":0.21834916},"labels":[],"label_agreement":null},{"id":"W2887697636","doi":"10.1061/9780784481264.003","title":"Recommender System for Improving BIM Efficiency: An Interior Finishing Case Study","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Recommender system; Computer science; World Wide Web","score_opus":0.06519546889621741,"score_gpt":0.3512973582163273,"score_spread":0.2861018893201099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887697636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9331306,0.00007280759,0.05460198,0.00003643718,0.008449782,0.0012452062,0.000039524024,0.0006642057,0.0017594481],"genre_scores_gemma":[0.9962129,0.0000029671671,0.0024379655,0.0000075389044,0.00087550713,0.00031888604,0.000007207374,0.000048508657,0.0000885097],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792486,0.00025100782,0.0004630199,0.00045948077,0.00037037247,0.000531264],"domain_scores_gemma":[0.998008,0.00017517175,0.00007263134,0.0004927481,0.0010549332,0.00019648962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013435143,0.0002086312,0.00022995542,0.00048109886,0.0008894018,0.00046730458,0.00026378848,0.00015856921,0.00015592799],"category_scores_gemma":[0.00016151511,0.00020311073,0.00006277737,0.00046102132,0.00057385257,0.0006394573,0.00007196941,0.0004053869,0.000052763262],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002678127,0.0001737759,0.0036360235,0.0006774107,0.0002529836,0.0002795732,0.0044701505,0.00012018553,0.017497705,0.009983933,0.004614862,0.9580256],"study_design_scores_gemma":[0.005366639,0.0043254388,0.00033055266,0.00038289186,0.0001372449,0.014161232,0.3367782,0.5840837,0.034235287,0.000687178,0.018020488,0.0014911555],"about_ca_topic_score_codex":0.0003175766,"about_ca_topic_score_gemma":0.0006875872,"teacher_disagreement_score":0.95653445,"about_ca_system_score_codex":0.00030702035,"about_ca_system_score_gemma":0.00011478016,"threshold_uncertainty_score":0.8282615},"labels":[],"label_agreement":null},{"id":"W2887795122","doi":"10.1155/2018/7259659","title":"Practices and Processes in BIM Projects: An Exploratory Case Study","year":2018,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Exploratory research; Building information modeling; Process management; Knowledge management; Business; Perception; Project management; Engineering management; Computer science; Engineering; Systems engineering; Operations management; Sociology; Psychology","score_opus":0.018728696894623555,"score_gpt":0.2787540057842128,"score_spread":0.26002530888958925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887795122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993671,0.0027046534,0.002580788,0.00000399241,0.00034951852,0.00020825613,0.0000010500376,0.00020573422,0.00027499054],"genre_scores_gemma":[0.9987279,0.00028408712,0.00072888547,0.0000039340916,0.000104343744,0.00012649568,5.826979e-7,0.000021983062,0.0000017677452],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936956,0.000020504349,0.00019129868,0.00018429662,0.00007631956,0.00015801334],"domain_scores_gemma":[0.99968696,0.00008185498,0.000038287504,0.00011613242,0.000041236635,0.00003550401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019583017,0.00012884421,0.000115987816,0.0002275646,0.000026855405,0.000038302045,0.000056726505,0.000041393218,0.0000069239077],"category_scores_gemma":[0.00017369764,0.00013198126,0.0000053453264,0.00045708273,0.000026375452,0.0018053846,0.000013624806,0.00015291222,0.0000016633759],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022166727,0.0006743559,0.2726295,0.0029957518,0.00009740786,0.002949767,0.15652725,0.39271358,0.008162077,0.0011577054,0.000020156353,0.1618508],"study_design_scores_gemma":[0.004153462,0.0020572657,0.008794016,0.0010833202,0.00005587209,0.0035666456,0.31083038,0.6347578,0.012110319,0.0005207455,0.019647343,0.0024228147],"about_ca_topic_score_codex":0.000032695003,"about_ca_topic_score_gemma":0.018433185,"teacher_disagreement_score":0.2638355,"about_ca_system_score_codex":0.00004556491,"about_ca_system_score_gemma":0.000020547257,"threshold_uncertainty_score":0.99947786},"labels":[],"label_agreement":null},{"id":"W2888490855","doi":"10.1080/10298436.2018.1511785","title":"Risk analysis in paving operations using discrete event simulation: a case study of Taiwan permeable asphalt concrete pavement pilot road project","year":2018,"lang":"en","type":"article","venue":"International Journal of Pavement Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Excavator; Truck; Engineering; Discrete event simulation; Software; Sensitivity (control systems); Total cost; Cost analysis; Simulation software; Data collection; Transport engineering; Event (particle physics); Civil engineering; Operations research; Computer science; Simulation; Statistics; Mathematics","score_opus":0.02283878285775297,"score_gpt":0.30289023650639746,"score_spread":0.2800514536486445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888490855","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.808004,0.000076838856,0.19089878,0.000008315348,0.0007323341,0.00022292527,0.00001640798,0.00002271297,0.000017678436],"genre_scores_gemma":[0.9967729,0.000017678614,0.0028348763,0.000005904887,0.0003207806,0.000013736438,0.000005693337,0.00002102763,0.000007415444],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980511,0.000056114754,0.0010456791,0.00014786565,0.0005274563,0.00017179093],"domain_scores_gemma":[0.9989849,0.00004394827,0.00023156655,0.00014167828,0.0005412834,0.000056645753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047440667,0.00018597358,0.00029932885,0.0009859246,0.00006221568,0.00008069366,0.00018780271,0.00003947784,0.00008310631],"category_scores_gemma":[0.000050641836,0.00017949915,0.00012940039,0.00054342364,0.000021490341,0.0004091544,0.000037979233,0.0002154954,8.6243534e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014902261,0.000054536573,0.009285313,0.000011714836,0.0012413842,0.00013284452,0.0024401692,0.9794165,0.006552281,0.000056506055,0.0000020311163,0.00079183374],"study_design_scores_gemma":[0.0011321282,0.00040614777,0.0015768335,0.000109385655,0.00030194988,0.0001619152,0.0040449095,0.9901526,0.0018916648,0.000005169976,0.000052885713,0.0001644012],"about_ca_topic_score_codex":0.00079966744,"about_ca_topic_score_gemma":0.00069445494,"teacher_disagreement_score":0.18876888,"about_ca_system_score_codex":0.0003857296,"about_ca_system_score_gemma":0.000053093223,"threshold_uncertainty_score":0.7319763},"labels":[],"label_agreement":null},{"id":"W2888947374","doi":"10.1016/j.autcon.2018.07.009","title":"Automated Crane Planning and Optimization for modular construction","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Modular design; Lift (data mining); Engineering; Plan (archaeology); Modular construction; Lifting equipment; Computer science; Operating system; Mechanical engineering","score_opus":0.008868786673722838,"score_gpt":0.23415949695181468,"score_spread":0.22529071027809183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888947374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36593604,0.000097508484,0.6288578,0.000078885765,0.0018205998,0.00039382008,0.000012206922,0.0018060115,0.00099715],"genre_scores_gemma":[0.8440891,0.000023511462,0.15546697,0.000019634419,0.00021154367,0.00009123533,0.00006505604,0.00002515113,0.00000781045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990185,0.00003252879,0.0004135029,0.00022934425,0.00011902709,0.00018709434],"domain_scores_gemma":[0.99951607,0.000046277746,0.000092819435,0.00012347482,0.00017533207,0.000046008674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015444148,0.00016484562,0.00016393527,0.00037677342,0.00016814636,0.0000861276,0.000045814544,0.00018809125,0.00009191798],"category_scores_gemma":[0.000047997983,0.00018974613,0.000030129882,0.00036882382,0.00021827592,0.00058446376,0.000007703905,0.00009782593,0.000007312964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008811602,0.00002146267,0.010532507,0.0002446019,0.000082793296,0.0000012590529,0.0010972639,0.63370866,0.0115357535,0.036306217,0.0007387404,0.3056426],"study_design_scores_gemma":[0.0007412726,0.000047265567,0.0037167345,0.00007419415,0.000017118768,0.00014460168,0.00038858427,0.98772705,0.0043860455,0.0020696756,0.00049158005,0.00019589864],"about_ca_topic_score_codex":0.000009308515,"about_ca_topic_score_gemma":0.000009166832,"teacher_disagreement_score":0.47815302,"about_ca_system_score_codex":0.00010856797,"about_ca_system_score_gemma":0.000024257673,"threshold_uncertainty_score":0.7737623},"labels":[],"label_agreement":null},{"id":"W2889342920","doi":"10.11159/ijci.2018.004","title":"Structural Design Developed in a BIM Environment: Benefits and Limitations","year":2018,"lang":"en","type":"article","venue":"International Journal of Civil Infrastructure","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Systems engineering; Construction engineering; Engineering","score_opus":0.02065791858393398,"score_gpt":0.22162707401152593,"score_spread":0.20096915542759194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889342920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94535375,0.0008803794,0.048919942,0.00044470382,0.002494801,0.00009797713,0.000016088487,0.00003314666,0.0017591865],"genre_scores_gemma":[0.9896155,0.00039752762,0.009485782,0.00006810912,0.0004059852,0.000002005851,0.000003378493,0.000012573413,0.000009148261],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99916846,0.00002412011,0.00036807198,0.00008085156,0.00025194732,0.00010657019],"domain_scores_gemma":[0.9995409,0.00007665823,0.000109570654,0.000054478434,0.00016247375,0.00005588098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093920404,0.000118124255,0.00012161539,0.00029722956,0.000032553147,0.00006417133,0.00017781454,0.00008332406,0.00023021117],"category_scores_gemma":[0.00006693276,0.000103692095,0.00003343564,0.0000962033,0.00008650736,0.00034698533,0.000020414112,0.00021461736,0.000005786283],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023319497,0.0000154945,0.027872719,0.000016314745,0.00043385127,0.000043624328,0.004921579,0.16417742,0.006484461,0.02834088,0.002702359,0.7647581],"study_design_scores_gemma":[0.004131908,0.00042668896,0.77048105,0.0004208871,0.000074690106,0.0034322839,0.0012450122,0.08122443,0.012421708,0.09627227,0.02898597,0.0008831137],"about_ca_topic_score_codex":0.0000019766815,"about_ca_topic_score_gemma":0.00009376874,"teacher_disagreement_score":0.763875,"about_ca_system_score_codex":0.000105828316,"about_ca_system_score_gemma":0.00004108835,"threshold_uncertainty_score":0.42284408},"labels":[],"label_agreement":null},{"id":"W2890974131","doi":"10.1007/978-3-030-00560-3_12","title":"Integrating Construction Specifications and Building Information Modeling","year":2018,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Software engineering","score_opus":0.01618171138215881,"score_gpt":0.21077274715354305,"score_spread":0.19459103577138423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2890974131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016046134,0.00012940404,0.990172,0.00004369466,0.0014010286,0.00013162267,0.000004813986,0.0001610582,0.0063517643],"genre_scores_gemma":[0.5025908,0.0001093385,0.49649924,0.00008166579,0.00065433275,0.000007666489,0.000015235371,0.000021867185,0.000019859266],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902606,0.0000044826497,0.00034437637,0.00024286851,0.00021404537,0.00016814184],"domain_scores_gemma":[0.9994426,0.0000444634,0.0000749841,0.00021025082,0.00017886162,0.000048860562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017651131,0.00020473995,0.0001562486,0.00051474426,0.00016741226,0.00027689984,0.00018162365,0.00018430453,0.00004005883],"category_scores_gemma":[0.000029884002,0.0002005936,0.000028894767,0.000180659,0.00033639855,0.0007402875,0.00005281591,0.0003819569,0.00001465311],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013786813,7.4901703e-7,0.0000148456165,0.00002716049,0.0000052855094,2.98467e-7,0.00059244136,0.13040105,0.00030844702,0.041929282,0.0000067323035,0.82671237],"study_design_scores_gemma":[0.000058705227,0.00001360887,0.0000062264307,0.00019143158,0.000005136955,0.00005473469,0.0000034819261,0.9247506,0.00065947545,0.07330635,0.00075356686,0.00019665145],"about_ca_topic_score_codex":0.0000063230354,"about_ca_topic_score_gemma":0.000027176926,"teacher_disagreement_score":0.8265157,"about_ca_system_score_codex":0.000167091,"about_ca_system_score_gemma":0.000060794835,"threshold_uncertainty_score":0.817997},"labels":[],"label_agreement":null},{"id":"W2891549375","doi":"10.1155/2018/8370931","title":"A Framework for Visualizing Heterogeneous Construction Data Using Semantic Web Standards","year":2018,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Computer science; Process (computing); Scope (computer science); Ontology; Data visualization; Web application; Semantic Web; Reusability; Data science; Data mining; Information retrieval; World Wide Web","score_opus":0.02114504344089685,"score_gpt":0.3116526671792647,"score_spread":0.29050762373836786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2891549375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04279967,0.0029060254,0.9506908,0.0000058595706,0.0027149776,0.00017479958,0.00009430405,0.00034774796,0.00026580883],"genre_scores_gemma":[0.89083755,0.00037217877,0.10818801,0.000008938621,0.000506306,0.000021592154,0.000016432485,0.00004766401,0.0000013248107],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897915,0.000007786844,0.00029364557,0.0002614124,0.0001651706,0.00029284964],"domain_scores_gemma":[0.9994116,0.00008450498,0.000037802674,0.00033890057,0.00008198383,0.000045197667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018386362,0.00018023392,0.00018879469,0.00017949156,0.00006797076,0.00004933314,0.00019138449,0.00010931846,0.00003639039],"category_scores_gemma":[0.00013816947,0.00020491553,0.000033601395,0.00029837436,0.000057500998,0.0006450087,0.00003940817,0.00016271911,0.0000021624428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040553685,0.000015923011,0.0010249349,0.00064107764,0.0000820515,0.0000065508093,0.0003026489,0.85615784,0.015037778,0.02795978,0.000059189966,0.098671675],"study_design_scores_gemma":[0.0002378629,0.000028962408,0.000010633665,0.00033465103,0.000015990721,0.00006708083,0.00007084926,0.9681159,0.0043717944,0.002222182,0.024276005,0.00024809205],"about_ca_topic_score_codex":0.000003117708,"about_ca_topic_score_gemma":0.00022818556,"teacher_disagreement_score":0.8480379,"about_ca_system_score_codex":0.0001674016,"about_ca_system_score_gemma":0.000033794924,"threshold_uncertainty_score":0.83562124},"labels":[],"label_agreement":null},{"id":"W2894668980","doi":"10.1108/978-1-78743-868-220181004","title":"Fuzzy Simulation Techniques in Construction Engineering and Management","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Computer science; Systems engineering; Process (computing); Discrete event simulation; Simulation modeling; Industrial engineering; Engineering; Control engineering; Simulation; Artificial intelligence; Mathematics","score_opus":0.007184235666520729,"score_gpt":0.19461971802902697,"score_spread":0.18743548236250623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2894668980","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002913541,0.00016595057,0.023733407,0.000007174756,0.0004013727,0.00027190268,0.000003684123,0.0006173234,0.9745078],"genre_scores_gemma":[0.39045265,0.008417447,0.18202618,0.00013349985,0.0022140474,0.00025823113,0.00022422854,0.00058811205,0.41568562],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948984,0.0000014199406,0.00020554944,0.00014408151,0.000077237084,0.0000818918],"domain_scores_gemma":[0.9998164,0.00000980321,0.000023853316,0.000101980724,0.000025172643,0.000022752542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000038671245,0.00017049583,0.00012820937,0.00030694428,0.000014453739,0.000027486654,0.000030103518,0.00021462863,0.0002236665],"category_scores_gemma":[0.0000011394641,0.00018313421,0.0000240924,0.000025377549,0.0000325356,0.00009337855,0.0000137054085,0.00013533684,0.000022967317],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050583885,0.0000016078706,0.000019991769,0.00027165978,0.0000622645,0.000005269467,0.000046476267,0.006640809,0.00010215248,0.7017875,0.00049587677,0.29056135],"study_design_scores_gemma":[0.00051113905,0.00007578745,0.0002491426,0.0013188174,0.0001131987,0.00010614664,0.00008637673,0.21410747,0.0017874808,0.09782247,0.6823405,0.0014814598],"about_ca_topic_score_codex":0.0000017135872,"about_ca_topic_score_gemma":0.000014109295,"teacher_disagreement_score":0.68184465,"about_ca_system_score_codex":0.000077320765,"about_ca_system_score_gemma":0.0000024363194,"threshold_uncertainty_score":0.74679965},"labels":[],"label_agreement":null},{"id":"W2895430233","doi":"10.1061/9780784481301.057","title":"Improved Target-Value Design Approach through the Integration of Environmental Performance and Reliability Theory","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College Saint-Jean; University of Alberta","funders":"","keywords":"Interdependence; Computer science; Stakeholder; Process management; Building information modeling; Value engineering; Activity-based costing; Systems engineering; Risk analysis (engineering); Engineering; Business; Operations management; Scheduling (production processes)","score_opus":0.028512684103118083,"score_gpt":0.2715133520780976,"score_spread":0.24300066797497955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895430233","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5744866,0.000521794,0.40944567,0.00009263351,0.0017596323,0.0010535896,0.000040208077,0.00016053779,0.012439306],"genre_scores_gemma":[0.97817487,0.00027683305,0.0210459,0.000009270223,0.00017876418,0.00007845106,0.0000074381887,0.000017488488,0.00021099672],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984754,0.00039165866,0.0003028706,0.00025394963,0.0003231964,0.00025292573],"domain_scores_gemma":[0.9991303,0.00019917924,0.000061573795,0.00036679703,0.0001895901,0.00005253539],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.0012278461,0.00014471344,0.00014872421,0.00009900357,0.00036731362,0.000061720406,0.00018046043,0.0001344272,0.00023131541],"category_scores_gemma":[0.00012098759,0.000103912425,0.000036397647,0.00023243474,0.003388901,0.00042332665,0.00005363869,0.00038957936,0.000014947812],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085888116,0.0001517792,0.0037560316,0.00032917465,0.00023040664,6.5137846e-7,0.005269459,0.0017207488,0.21590497,0.112625994,0.0055178385,0.6536341],"study_design_scores_gemma":[0.0011035235,0.00067801826,0.008545377,0.00010744015,0.000044393342,0.00016879117,0.009464936,0.61175215,0.33106023,0.027660541,0.008928526,0.0004860848],"about_ca_topic_score_codex":0.000019801388,"about_ca_topic_score_gemma":0.0000016583417,"teacher_disagreement_score":0.653148,"about_ca_system_score_codex":0.0000968904,"about_ca_system_score_gemma":0.000049242437,"threshold_uncertainty_score":0.9993233},"labels":[],"label_agreement":null},{"id":"W2895994267","doi":"10.1007/978-3-030-00220-6_103","title":"Lessons Learned from a Multi-year Initiative to Integrate Data-Driven Design Using BIM into Undergraduate Architectural Education","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Curriculum; Building information modeling; Engineering management; Studio; Design studio; Engineering; Computer science; Systems engineering; Software engineering; Pedagogy; Psychology","score_opus":0.17810457182510084,"score_gpt":0.32544082002835256,"score_spread":0.14733624820325172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895994267","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00077432586,0.00012164693,0.9554728,0.00060846715,0.0016087487,0.0005658186,0.0002886009,0.000469318,0.04009027],"genre_scores_gemma":[0.10188184,0.00028609642,0.8275338,0.0005793023,0.001962084,0.00008719215,0.0031427934,0.00044483432,0.06408205],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985068,0.000051761534,0.00040952722,0.0006027293,0.00020535493,0.00022383958],"domain_scores_gemma":[0.9987252,0.000086053486,0.00011806884,0.00070088025,0.00021806046,0.00015175207],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009589471,0.00047071133,0.00036766272,0.0003909548,0.000121255114,0.00015168966,0.00042230697,0.0003202255,0.0007843058],"category_scores_gemma":[0.00004491238,0.00043398468,0.0000838883,0.00008915517,0.00011318722,0.00026600374,0.00013280279,0.0005196463,0.0006742413],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023305215,0.00007873754,0.000024125282,0.00015097132,0.0017913121,0.00000992638,0.006809962,0.029176602,0.00824783,0.18386698,0.022137484,0.747473],"study_design_scores_gemma":[0.0009270801,0.00019621778,0.000050535546,0.0016259243,0.0005377435,0.00003999232,0.0020135324,0.5774166,0.003751768,0.35108137,0.059857875,0.0025013415],"about_ca_topic_score_codex":0.00048695132,"about_ca_topic_score_gemma":0.0014938903,"teacher_disagreement_score":0.7449717,"about_ca_system_score_codex":0.0003145068,"about_ca_system_score_gemma":0.000324382,"threshold_uncertainty_score":0.9998112},"labels":[],"label_agreement":null},{"id":"W2896343837","doi":"10.1121/1.5068403","title":"Compatibility study between building information modeling and acoustic simulation software","year":2018,"lang":"en","type":"article","venue":"The Journal of the Acoustical Society of America","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Reverberation; Interoperability; Software; Process (computing); Visualization; Simulation software; Building information modeling; Acoustics; Human–computer interaction; Compatibility (geochemistry); Data mining; Engineering; World Wide Web","score_opus":0.015356875680017548,"score_gpt":0.25808836315870287,"score_spread":0.24273148747868534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896343837","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40779078,0.000022175858,0.59195,0.00005371071,0.00009435072,0.00006681387,0.0000023622597,0.000012628831,0.0000072162766],"genre_scores_gemma":[0.9836728,0.000014597099,0.016095782,0.000057457713,0.00015286457,3.9456407e-7,2.6306472e-7,0.0000051073052,7.183011e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991903,0.00005454551,0.0003899405,0.00003290284,0.000244169,0.00008818985],"domain_scores_gemma":[0.99915326,0.00026606835,0.00016590502,0.00012528019,0.000256194,0.000033278964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003744956,0.00007656044,0.00015807357,0.00001649563,0.0001613508,0.000020247828,0.00015036004,0.000040308383,0.0000087436265],"category_scores_gemma":[0.00014786828,0.00004368353,0.00007882595,0.00015063734,0.00020817999,0.00024063603,0.000041192347,0.00023413624,8.3564936e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016521693,0.000011814614,0.002057441,0.000022191147,0.000069868256,9.11036e-9,0.0021118335,0.9594096,0.0006081347,8.8982557e-7,0.0001306147,0.035561074],"study_design_scores_gemma":[0.00017224925,0.0001223471,0.00450109,0.000026999427,0.00015808674,0.0000032761182,0.0026874202,0.9916845,0.00010156298,0.00046384387,0.00003170561,0.00004693615],"about_ca_topic_score_codex":0.000018541548,"about_ca_topic_score_gemma":6.127497e-7,"teacher_disagreement_score":0.575882,"about_ca_system_score_codex":0.00004671474,"about_ca_system_score_gemma":0.000017995928,"threshold_uncertainty_score":0.17813626},"labels":[],"label_agreement":null},{"id":"W2896377197","doi":"10.1007/978-3-319-97846-8_7","title":"The Entries of EDMs","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Matrix (chemical analysis); Current (fluid); Value (mathematics); Zero (linguistics); Mathematics; Computer science; Algorithm; Combinatorics; Pure mathematics; Engineering; Statistics; Electrical engineering; Materials science","score_opus":0.00632551423250638,"score_gpt":0.17086861082310056,"score_spread":0.16454309659059418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896377197","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000015833337,0.00049960543,0.0012970691,0.00001942759,0.0007437342,0.000033100576,0.000004310015,0.00006692426,0.99732],"genre_scores_gemma":[0.004206429,0.00047729452,0.00010158771,0.000007423991,0.0002262508,0.0000019553795,0.000003776891,0.00001466056,0.9949606],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99976814,7.0691215e-7,0.000104093706,0.00003421931,0.000056303492,0.00003654396],"domain_scores_gemma":[0.99981093,0.00001615855,0.00001909602,0.000102862134,0.00004248352,0.000008439011],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000018932873,0.000062536725,0.000059104914,0.000018049761,0.000022785422,0.000010560791,0.00004850235,0.00008578154,0.002334199],"category_scores_gemma":[0.0000017131399,0.0000383909,0.000037405993,0.0000043790724,0.00008056755,0.000014989108,0.000005165216,0.00006085932,0.00014729841],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010943471,1.5562027e-7,9.1825945e-7,0.000008303545,0.000032131546,5.8023662e-8,0.000024330206,0.0000026314435,0.00001982541,0.9343623,0.037324008,0.028224235],"study_design_scores_gemma":[0.00001781551,0.0000068814907,0.0000018955822,0.000017217935,0.000008195838,0.0000021563824,0.000016592017,0.000111307076,0.0012910396,0.035176765,0.9633009,0.000049272476],"about_ca_topic_score_codex":0.0000013895614,"about_ca_topic_score_gemma":0.000027309645,"teacher_disagreement_score":0.9259769,"about_ca_system_score_codex":0.000008638069,"about_ca_system_score_gemma":0.000006821214,"threshold_uncertainty_score":0.9985778},"labels":[],"label_agreement":null},{"id":"W2896896777","doi":"10.22260/isarc2018/0170","title":"Utilization of Virtual Reality Visualizations on Heavy Mobile Crane Planning for Modular Construction","year":2018,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Lift (data mining); Modular design; Virtual reality; Visualization; Computer science; Virtual machine; Process (computing); Human–computer interaction; Heavy equipment; Engineering; Construction engineering; Simulation; Automotive engineering","score_opus":0.029810655025678194,"score_gpt":0.2850040056296489,"score_spread":0.2551933506039707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896896777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9477431,0.00004959149,0.044792965,0.000061863546,0.0007975705,0.0005299825,0.00004830121,0.0001444468,0.0058321776],"genre_scores_gemma":[0.9988214,0.000012351955,0.0008843118,0.000013954854,0.00014489029,0.000049048864,0.000007708322,0.000017111144,0.00004921747],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993349,0.0000040738223,0.00028052914,0.00012012297,0.00015562226,0.00010475052],"domain_scores_gemma":[0.9993259,0.000024243844,0.00012685476,0.00007826582,0.00042203366,0.000022707005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013024712,0.00009749708,0.00013419885,0.000088586145,0.00011016791,0.00001606949,0.000113784714,0.00008176426,0.000020687188],"category_scores_gemma":[0.000073995936,0.00008186837,0.00006338388,0.00026018562,0.00017840888,0.00015538238,0.000014617566,0.0000626789,0.0000012494245],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040419315,0.00015100381,0.007721781,0.000745887,0.00018081984,3.091367e-8,0.0047679986,0.023671975,0.349691,0.5381594,0.0065544993,0.06795144],"study_design_scores_gemma":[0.00048125064,0.00039369203,0.0013592881,0.0002456014,0.000052597577,0.000008751742,0.0019572917,0.12098838,0.862276,0.007936813,0.004132633,0.00016769345],"about_ca_topic_score_codex":0.000006692783,"about_ca_topic_score_gemma":0.0000011388755,"teacher_disagreement_score":0.53022254,"about_ca_system_score_codex":0.000036150563,"about_ca_system_score_gemma":0.000013053241,"threshold_uncertainty_score":0.33384952},"labels":[],"label_agreement":null},{"id":"W2897432083","doi":"10.22260/isarc2018/0124","title":"BIM-based Surface-Specific Solar Simulation of Buildings","year":2018,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Photovoltaic system; Photovoltaic mounting system; Architectural engineering; Building envelope; Computer science; Building-integrated photovoltaics; Solar energy; Building information modeling; Rooftop photovoltaic power station; Electricity generation; Environmental science; Engineering; Power (physics); Meteorology; Electrical engineering","score_opus":0.012807934224371448,"score_gpt":0.21198934416108395,"score_spread":0.1991814099367125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897432083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9893862,0.00010438425,0.0053002876,0.00009769499,0.00040029644,0.00012768172,0.000005337205,0.00009975316,0.0044783796],"genre_scores_gemma":[0.9971795,0.0000074044087,0.0026365009,0.000017659942,0.00010329787,0.000002228168,5.6545406e-7,0.000016925762,0.00003589611],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99937546,0.0000020662908,0.00022958599,0.00009991077,0.00018155854,0.00011139954],"domain_scores_gemma":[0.9994252,0.000022653378,0.00010077403,0.000079221725,0.0003500685,0.000022121958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001241136,0.00009426867,0.00011871633,0.00006119866,0.000055059158,0.000018479761,0.00017797365,0.00007057494,0.000097246084],"category_scores_gemma":[0.000028150913,0.00007429375,0.00006990872,0.00028809544,0.00014210992,0.00015258601,0.000018720702,0.00008890252,0.000008407641],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005854523,0.00003173207,0.008730532,0.00022621958,0.000040470593,2.402688e-8,0.000578691,0.033854272,0.9238285,0.020691657,0.0026906508,0.009268754],"study_design_scores_gemma":[0.0002449677,0.000047483223,0.0013679436,0.00009599361,0.00001604424,0.0000011494751,0.00013755927,0.1447539,0.8387565,0.002504748,0.011959527,0.00011416057],"about_ca_topic_score_codex":0.0000044157746,"about_ca_topic_score_gemma":7.3831467e-7,"teacher_disagreement_score":0.110899635,"about_ca_system_score_codex":0.00003099651,"about_ca_system_score_gemma":0.0000094121115,"threshold_uncertainty_score":0.3029611},"labels":[],"label_agreement":null},{"id":"W2897513707","doi":"10.3311/ccc2018-075","title":"Involving knowledge of construction and facilities management in design through the BIM approach","year":2018,"lang":"en","type":"article","venue":"Creative Construction Conference 2018 - Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; Queen's University; Queen's University Belfast","keywords":"Computer science; Systems engineering; Knowledge management; Construction engineering; Engineering management; Engineering","score_opus":0.041962756246215836,"score_gpt":0.24421850918863858,"score_spread":0.20225575294242273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897513707","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24351701,0.00081967266,0.466034,0.00007241161,0.0010880146,0.0010911172,0.000023416935,0.00032013463,0.2870342],"genre_scores_gemma":[0.94201446,0.0005038277,0.056959447,0.000008845179,0.00011335516,0.00011774509,0.0000036290505,0.000016358428,0.00026232464],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.998922,0.000032249776,0.00040037377,0.00029589704,0.00012978193,0.00021968136],"domain_scores_gemma":[0.99924624,0.000036982034,0.00012171515,0.00010500517,0.00044920848,0.00004086634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020158301,0.00023198476,0.00024720476,0.00020775538,0.00018778755,0.000101793135,0.00013650233,0.00013195432,0.00013495224],"category_scores_gemma":[0.000035674635,0.0001899837,0.000035167748,0.00045826597,0.0019286738,0.000628461,0.000045328045,0.00020529106,0.000009315282],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005978764,0.00002303497,0.0029542723,0.00030210914,0.00013310103,1.5609993e-7,0.013735405,0.000022659398,0.0023440355,0.8828697,0.0005259691,0.09702973],"study_design_scores_gemma":[0.0034503273,0.0006114678,0.009521199,0.0011775977,0.0003097615,0.00061472715,0.56545746,0.110699736,0.10105308,0.18242659,0.022930361,0.0017476582],"about_ca_topic_score_codex":0.000050724535,"about_ca_topic_score_gemma":0.0000114906525,"teacher_disagreement_score":0.70044315,"about_ca_system_score_codex":0.000088053115,"about_ca_system_score_gemma":0.000041974294,"threshold_uncertainty_score":0.774731},"labels":[],"label_agreement":null},{"id":"W2897628261","doi":"10.1016/j.aei.2018.10.003","title":"Random generation of industrial pipelines’ data using Markov chain model","year":2018,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Pipeline transport; Markov chain; Pipeline (software); Computer science; Process (computing); Markov process; Data mining; Markov model; Engineering; Statistics; Machine learning; Mathematics; Mechanical engineering","score_opus":0.048902363377067194,"score_gpt":0.2463009613770248,"score_spread":0.19739859799995763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897628261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13153145,0.00004348027,0.8668131,0.000002952501,0.0008944271,0.00011609755,0.000040282786,0.00016566181,0.00039254985],"genre_scores_gemma":[0.74545515,0.00003614633,0.25388777,0.0000122493775,0.00044447562,0.0000058869564,0.00011915356,0.000025821253,0.000013359078],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912834,0.0000036328863,0.0005097358,0.00006407986,0.00013909036,0.00015510341],"domain_scores_gemma":[0.99940974,0.000017033764,0.000071874434,0.00036583998,0.000093861636,0.000041645162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014066955,0.00013895579,0.00016659962,0.00012354967,0.000036355796,0.000021202459,0.0001780722,0.00010429915,0.000010410646],"category_scores_gemma":[0.00005688945,0.0001431773,0.000025086736,0.00019812935,0.000027619188,0.0007374542,0.0000384117,0.00013529714,0.0000042999573],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008314688,0.0000023032414,0.000008931856,0.000035592486,0.00001682722,5.6672953e-8,0.00020141927,0.9569757,0.012280798,0.00035565402,0.00020196725,0.02991245],"study_design_scores_gemma":[0.00073141255,0.000012241376,0.0000015048103,0.000047644593,0.00001629358,0.0000065199383,0.00004779548,0.98448336,0.013082899,0.00001759293,0.0014082895,0.00014446073],"about_ca_topic_score_codex":0.0000018431148,"about_ca_topic_score_gemma":0.0000026195792,"teacher_disagreement_score":0.61392367,"about_ca_system_score_codex":0.00004484013,"about_ca_system_score_gemma":0.000028449298,"threshold_uncertainty_score":0.5838601},"labels":[],"label_agreement":null},{"id":"W2897774673","doi":"10.1007/978-3-030-00220-6_41","title":"Towards Automated Analysis of Ambiguity in Modular Construction Contract Documents (A Qualitative &amp; Quantitative Study)","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ambiguity; Modular design; Computer science; Programming language","score_opus":0.034627910572905395,"score_gpt":0.33285407371235065,"score_spread":0.2982261631394453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897774673","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.417413,0.00030583586,0.026524836,0.000014325765,0.001392179,0.0012787204,0.0005200156,0.0011737505,0.55137736],"genre_scores_gemma":[0.9802954,0.00010032186,0.005159022,0.000009651862,0.000035703502,0.000037929953,0.0003132219,0.00005528283,0.013993451],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99808663,0.000098025244,0.0009152809,0.00035169924,0.00038046745,0.00016792212],"domain_scores_gemma":[0.99883366,0.00008249621,0.00028448636,0.00032040122,0.00042470664,0.000054241158],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00039037087,0.00036768746,0.00090113614,0.0011893619,0.0000342323,0.000025939074,0.00012654637,0.00033336977,0.0029071711],"category_scores_gemma":[0.0000420878,0.00035522017,0.00024004857,0.00037478763,0.000223961,0.00021140299,0.000021924476,0.00028698109,0.0000631981],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046082155,0.0004230367,0.0028337925,0.00036474926,0.046638686,0.00002267609,0.08269467,0.02032001,0.0017620886,0.8169585,0.0029836656,0.024537325],"study_design_scores_gemma":[0.010122669,0.0024768773,0.051063176,0.0013881371,0.02041519,0.000034786248,0.07852594,0.66699094,0.0027808794,0.14005521,0.018958725,0.0071874904],"about_ca_topic_score_codex":0.001068662,"about_ca_topic_score_gemma":0.0060664476,"teacher_disagreement_score":0.67690325,"about_ca_system_score_codex":0.00025098387,"about_ca_system_score_gemma":0.00005199137,"threshold_uncertainty_score":0.99988997},"labels":[],"label_agreement":null},{"id":"W2898328996","doi":"10.29173/mocs172","title":"Permanent Modular Construction: Construction Performance","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Modular construction; Sample (material); Construction industry; Computer science; Construction management; Test (biology); Engineering; Construction engineering; Civil engineering","score_opus":0.011126353265989914,"score_gpt":0.1857710283249126,"score_spread":0.1746446750589227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898328996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9741014,0.0009292498,0.0071901055,0.00018722753,0.003572221,0.00042588904,0.000025581494,0.0009852985,0.012583004],"genre_scores_gemma":[0.9795056,0.00067636505,0.018593015,0.000068090354,0.0007059491,0.00007586366,0.00005063744,0.00007383266,0.00025067045],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99750745,0.000022719241,0.00070981606,0.00065767433,0.00056047173,0.0005418539],"domain_scores_gemma":[0.9984541,0.000013290967,0.00018895026,0.00024698992,0.00066235673,0.00043430398],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028281554,0.000548599,0.00048994395,0.0004632019,0.00040702222,0.00032909858,0.00018925304,0.00039697892,0.000104126564],"category_scores_gemma":[0.000032762488,0.0005799241,0.00013739186,0.0006128048,0.0007666658,0.0015227342,0.00006407413,0.00054833625,0.00008319724],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030491978,0.00008331179,0.18876322,0.0008720858,0.0005163228,0.000016716163,0.0017511824,0.0058062146,0.015787786,0.10649571,0.005439798,0.67416275],"study_design_scores_gemma":[0.011574654,0.0010628548,0.026345976,0.0009610613,0.00097355153,0.015754947,0.031318218,0.39499947,0.114444956,0.018949853,0.37737447,0.00623999],"about_ca_topic_score_codex":0.000020218338,"about_ca_topic_score_gemma":0.000007278524,"teacher_disagreement_score":0.66792274,"about_ca_system_score_codex":0.00026588468,"about_ca_system_score_gemma":0.000078880745,"threshold_uncertainty_score":0.9996652},"labels":[],"label_agreement":null},{"id":"W2898373675","doi":"10.1111/mice.12420","title":"Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects","year":2018,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Earthworks; Automated planning and scheduling; Testbed; Planner; Plan (archaeology); Computer science; Robotics; Site plan; Project management; Scheduling (production processes); Project planning; Systems engineering; Engineering; Software engineering; Artificial intelligence; Robot; Urban planning; Regional planning; Civil engineering; Operations management","score_opus":0.010095544581944556,"score_gpt":0.20389085064382864,"score_spread":0.19379530606188408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898373675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23730493,0.0000475014,0.75751823,0.000014970733,0.0009326986,0.00017469472,0.000004602499,0.00084757473,0.0031547837],"genre_scores_gemma":[0.8225802,8.381341e-7,0.17629565,0.0001200245,0.0009086044,0.000028241648,0.00001235762,0.000048241534,0.0000058026344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986148,0.000017151373,0.00034088135,0.0004019771,0.00021540627,0.0004097738],"domain_scores_gemma":[0.99941033,0.0000544898,0.00004903481,0.00022472821,0.00006693992,0.00019446138],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0000917367,0.0003752328,0.00029632123,0.00034961558,0.00019295429,0.00016892121,0.00014215123,0.00020889401,0.000009395766],"category_scores_gemma":[0.000023313674,0.00036768103,0.00005789325,0.00037831458,0.00006894081,0.00020417866,0.000042108317,0.0004617398,0.000005781612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013420523,0.0000057036527,0.00029479634,0.000087600936,0.00002827972,0.0000017286944,0.0007285043,0.96966124,0.002071534,0.0030734208,0.0008800002,0.023153769],"study_design_scores_gemma":[0.000334102,0.00012978952,0.0022297413,0.0003563602,0.000011435834,0.00006300727,0.00006622191,0.99281704,0.0022137598,0.00018478147,0.0012003233,0.0003934448],"about_ca_topic_score_codex":5.7591006e-7,"about_ca_topic_score_gemma":3.0064868e-7,"teacher_disagreement_score":0.5852753,"about_ca_system_score_codex":0.00008624467,"about_ca_system_score_gemma":0.00003329104,"threshold_uncertainty_score":0.9998775},"labels":[],"label_agreement":null},{"id":"W2900196809","doi":"10.1108/f-04-2017-0045","title":"Lean-Agile FM-BIM: a demonstrated approach","year":2018,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Agile software development; Facility management; Building information modeling; Asset (computer security); Computer science; Systems engineering; Asset management; Ontology; Process management; Engineering; Software engineering; Operations management","score_opus":0.01294135172526372,"score_gpt":0.19135132395433413,"score_spread":0.1784099722290704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900196809","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58959436,0.0002382213,0.042920742,0.000020626709,0.00083090994,0.00010452023,0.000083368075,0.0009567489,0.36525047],"genre_scores_gemma":[0.9940173,0.0000063303796,0.0010063407,0.000014620532,0.00015184525,0.000013312351,0.000020797326,0.000008588658,0.004760863],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995671,0.0000071847335,0.00011633882,0.00009327844,0.00007711515,0.00013897412],"domain_scores_gemma":[0.99978137,0.000008819055,0.000008225951,0.00011547968,0.00005360121,0.000032488344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000036363992,0.0000898232,0.00007818595,0.000047998696,0.000068333546,0.000032781285,0.000058485766,0.00006623277,0.0005853372],"category_scores_gemma":[0.0000082862825,0.00008431777,0.00002922501,0.00009912046,0.00013751512,0.00011623991,0.000006183852,0.000083601335,0.00031091966],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009933376,0.00012534497,0.008938988,0.00074633554,0.00047316265,0.0000064831556,0.018591622,0.0040012444,0.037273448,0.41817775,0.14883411,0.36273217],"study_design_scores_gemma":[0.0010392742,0.0002581562,0.002729088,0.000059160266,0.00004540313,0.00017088548,0.026832158,0.20404229,0.10753496,0.01841841,0.63754845,0.0013217888],"about_ca_topic_score_codex":0.00003530774,"about_ca_topic_score_gemma":0.000027320591,"teacher_disagreement_score":0.48871434,"about_ca_system_score_codex":0.000024119556,"about_ca_system_score_gemma":0.000011840005,"threshold_uncertainty_score":0.64090323},"labels":[],"label_agreement":null},{"id":"W2901090113","doi":"10.1108/bepam-01-2018-0002","title":"BIM-based energy consumption assessment of the on-site construction of building structural systems","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Energy consumption; Structural system; Building information modeling; Key (lock); Productivity; Consumption (sociology); Environmental impact assessment; Computer science; Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","score_opus":0.011006315260174745,"score_gpt":0.23596213145226239,"score_spread":0.22495581619208765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901090113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93215203,0.000107617685,0.063912116,0.000026989828,0.00076104916,0.00042668614,0.000033005013,0.000049549835,0.002530961],"genre_scores_gemma":[0.9956482,0.00012483793,0.004059398,0.000012620475,0.0000491672,0.00004526844,0.000011402339,0.000011626322,0.0000374582],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991346,0.000046564677,0.00028374512,0.0001663222,0.000249571,0.00011918033],"domain_scores_gemma":[0.99958324,0.000016107873,0.00013014853,0.00023869358,0.000012950391,0.000018877838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102053906,0.00014150726,0.00014383934,0.00013221095,0.00007867248,0.000024519673,0.00008753622,0.00005139489,0.000045120865],"category_scores_gemma":[0.0000010897222,0.0001070627,0.000047219168,0.00009082951,0.00019533647,0.00006896649,0.00004125251,0.00006227207,0.0000012027854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008815552,0.000116420146,0.15312538,0.0014756084,0.0006609665,0.0000022667662,0.00015197971,0.046053518,0.04340146,0.5951586,0.0008040421,0.15896164],"study_design_scores_gemma":[0.002722928,0.00066178077,0.3261606,0.0007360804,0.00039757224,0.000027505856,0.0006814444,0.5673589,0.07403919,0.0011962906,0.025203295,0.00081440946],"about_ca_topic_score_codex":0.00003791205,"about_ca_topic_score_gemma":0.0000051885004,"teacher_disagreement_score":0.5939623,"about_ca_system_score_codex":0.00007826527,"about_ca_system_score_gemma":0.000007805785,"threshold_uncertainty_score":0.436589},"labels":[],"label_agreement":null},{"id":"W2901529558","doi":"10.1108/978-1-78769-793-520181011","title":"Analyzing the Documents Accompanying Decisions","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Computer science; Information retrieval; Data science; History","score_opus":0.02004260240634036,"score_gpt":0.23652716681718255,"score_spread":0.21648456441084218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901529558","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015078542,0.00042409587,0.017473405,0.000032156826,0.0010313735,0.000086816246,0.0000047279304,0.00023674977,0.9805599],"genre_scores_gemma":[0.041178774,0.0006867285,0.001487444,0.00006998206,0.0008639457,0.000012873672,0.000026473275,0.0000822691,0.9555915],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99945116,0.0000029064452,0.0002064383,0.000120718716,0.00011461276,0.00010415519],"domain_scores_gemma":[0.99956465,0.000052458076,0.000033048822,0.0002638668,0.00005290631,0.00003306216],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000056304634,0.0001655015,0.00012595205,0.00009361173,0.00011510131,0.000088907065,0.00016080108,0.00014596884,0.007497652],"category_scores_gemma":[0.0000062281542,0.0001078609,0.000097341,0.000024785375,0.000045963556,0.00008239837,0.000027270238,0.00022806085,0.0010661599],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033580093,0.0000024750493,0.00002064885,0.00001075711,0.0003355053,0.0000019343465,0.00015386117,0.0002354991,0.00007795952,0.31758147,0.14206654,0.53951],"study_design_scores_gemma":[0.00009549816,0.000005242595,0.000033251454,0.00014197173,0.000066382425,0.000015694242,0.00004677481,0.002390798,0.00010638107,0.05459977,0.94223386,0.00026440003],"about_ca_topic_score_codex":0.00000380455,"about_ca_topic_score_gemma":0.0000389173,"teacher_disagreement_score":0.8001673,"about_ca_system_score_codex":0.00004853094,"about_ca_system_score_gemma":0.000010439101,"threshold_uncertainty_score":0.99971163},"labels":[],"label_agreement":null},{"id":"W2901878489","doi":"10.1108/jchmsd-09-2018-0067","title":"Level of detail, information and accuracy in building information modelling of existing and heritage buildings","year":2018,"lang":"en","type":"article","venue":"Journal of Cultural Heritage Management and Sustainable Development","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Building information modeling; Documentation; Context (archaeology); Information model; Architecture; Engineering management; Benchmark (surveying); Computer science; Integrated project delivery; Construction engineering; Work (physics); Originality; Architectural engineering; Systems engineering; Engineering; Facility management; Software engineering; Project management; Operations management; Business","score_opus":0.03416205905837242,"score_gpt":0.2396245467576982,"score_spread":0.2054624876993258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901878489","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9375184,0.00036771462,0.060658764,0.000020499629,0.00006207422,0.0001483255,8.6533885e-7,0.000009563131,0.0012137606],"genre_scores_gemma":[0.9549737,0.0004253788,0.04449655,0.000010502782,0.000014213044,0.0000035422624,0.0000021591607,0.0000036442011,0.00007031211],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9988981,0.0000109700295,0.0007237132,0.000046087993,0.00016464006,0.00015652397],"domain_scores_gemma":[0.9993065,0.000017134444,0.00027364114,0.00003605398,0.00032812465,0.00003857483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042623226,0.00011059779,0.00018812408,0.00030723,0.00008408113,0.00009628426,0.000056105288,0.00004593421,0.000003930918],"category_scores_gemma":[0.000027073856,0.00009443627,0.000017969982,0.00018527027,0.00005240949,0.0027281626,0.000060334773,0.00009281951,1.5343088e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003488055,0.000045626017,0.009942729,0.0101250205,0.0003877927,0.000026553354,0.084003285,0.017166624,0.0020005181,0.08245684,0.00033673175,0.7931595],"study_design_scores_gemma":[0.006705605,0.0005504276,0.06503521,0.002898203,0.00017885197,0.000271646,0.63546157,0.16653597,0.022792049,0.0055838157,0.092606716,0.0013799046],"about_ca_topic_score_codex":0.000020718659,"about_ca_topic_score_gemma":0.0000052501287,"teacher_disagreement_score":0.7917796,"about_ca_system_score_codex":0.00007577366,"about_ca_system_score_gemma":0.00001728135,"threshold_uncertainty_score":0.38509992},"labels":[],"label_agreement":null},{"id":"W2902687294","doi":"10.29173/mocs52","title":"Manufacturing of modular buildings: a literature review","year":2017,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Factory (object-oriented programming); Process (computing); Field (mathematics); Manufacturing engineering; Productivity; Engineering; Systems engineering; Advanced manufacturing; Computer science; Process management; Engineering management","score_opus":0.020615670465966136,"score_gpt":0.2617338821326967,"score_spread":0.2411182116667306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902687294","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024776635,0.9947481,0.0005534064,0.000021526497,0.0010850842,0.0008959601,0.00010290143,0.0002982687,0.0020469425],"genre_scores_gemma":[0.00024338758,0.996129,0.0025780182,0.000022879687,0.00039623174,0.00012865095,0.00011327454,0.00011128287,0.00027730726],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973246,0.000024314815,0.001153062,0.0007120718,0.00037749525,0.0004084984],"domain_scores_gemma":[0.99829197,0.0000216395,0.00073310715,0.00044254924,0.0003240271,0.00018672177],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030797618,0.000842175,0.002162283,0.00057747605,0.00027974736,0.00035595158,0.00042966902,0.00075311266,0.00006307902],"category_scores_gemma":[0.000058336907,0.00075728906,0.0006434822,0.00033850173,0.00029090804,0.00081577664,0.00010143216,0.0009229724,0.000014820642],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029484647,0.0000066244975,0.00001703786,0.09046991,0.00023301663,0.000005439992,0.00003657411,0.0000024804535,0.000022236041,0.0014831822,0.00075778045,0.90696275],"study_design_scores_gemma":[0.00018877834,0.00002584582,0.0000069993584,0.09919701,0.00088629534,0.0006781396,0.00003322375,0.00015139233,0.00024462419,0.00022873258,0.8977134,0.00064551574],"about_ca_topic_score_codex":0.0000052693335,"about_ca_topic_score_gemma":0.0000019335664,"teacher_disagreement_score":0.90631723,"about_ca_system_score_codex":0.00012190204,"about_ca_system_score_gemma":0.000055826436,"threshold_uncertainty_score":0.9994878},"labels":[],"label_agreement":null},{"id":"W2903256777","doi":"10.1108/bepam-02-2018-0046","title":"Analysis of BIM use for asset management in three public organizations in Québec, Canada","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; HEC Montréal","funders":"","keywords":"Asset (computer security); Building information modeling; Originality; Asset management; Knowledge management; Nuclear decommissioning; Process management; Engineering; Engineering management; Computer science; Business; Operations management","score_opus":0.014407438424904159,"score_gpt":0.21106674948479606,"score_spread":0.1966593110598919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903256777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.926414,0.00016295657,0.06734733,0.00052412425,0.00021754442,0.001756283,0.000116611045,0.00006513124,0.0033960296],"genre_scores_gemma":[0.9965719,0.00031421715,0.0024578776,0.000045432113,0.000014901825,0.00020323289,0.0001157239,0.000016718177,0.0002599796],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99907166,0.000015960857,0.00031615718,0.00022836385,0.00016922562,0.00019860813],"domain_scores_gemma":[0.9996538,0.000020720498,0.000049604823,0.00023373611,0.000013534161,0.000028572733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011951362,0.00014065365,0.0001835214,0.000619143,0.00004303156,0.000044485776,0.00011087011,0.00003782673,0.00009360135],"category_scores_gemma":[0.000005337209,0.00014206585,0.000029676563,0.0008430231,0.000038482733,0.00016175146,0.000066701425,0.000048628208,0.0000015762455],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032881188,0.00026722992,0.82957226,0.0003561737,0.002792119,0.000015106763,0.0002596864,0.014638516,0.00017183388,0.032854505,0.006777342,0.112262346],"study_design_scores_gemma":[0.0008660131,0.000053152296,0.79378843,0.000028400253,0.00047702098,6.862308e-7,0.0007209354,0.07204436,0.00012852867,0.00019160255,0.1313648,0.0003360907],"about_ca_topic_score_codex":0.07070136,"about_ca_topic_score_gemma":0.83058304,"teacher_disagreement_score":0.7598817,"about_ca_system_score_codex":0.00028962246,"about_ca_system_score_gemma":0.00002700144,"threshold_uncertainty_score":0.9354869},"labels":[],"label_agreement":null},{"id":"W2903887606","doi":"10.3390/buildings8120178","title":"Automation of Measuring Actual Productivity of Earthwork in Urban Area, a Case Study from Montreal","year":2018,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earthworks; Global Positioning System; Productivity; Automation; Duration (music); Engineering; Transport engineering; Operations research; Civil engineering; Computer science; Industrial engineering; Telecommunications","score_opus":0.014332748805983704,"score_gpt":0.21043914308601125,"score_spread":0.19610639428002755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903887606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972386,0.000041662992,0.0019954997,0.0000043126265,0.00018257437,0.0001653821,0.0000059116255,0.00006743723,0.00029862806],"genre_scores_gemma":[0.9990436,7.764172e-7,0.000831222,7.048813e-7,0.00009572459,0.000010204703,0.0000011314546,0.000007676881,0.000008979999],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99946624,0.00001970427,0.00021271,0.00011533187,0.000109149936,0.00007688783],"domain_scores_gemma":[0.99970466,0.000022467224,0.000053818516,0.00013192205,0.00006913528,0.000017979459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001233203,0.00007348333,0.00013420873,0.000103497754,0.000020018195,0.000007811824,0.00004223872,0.0000414717,0.000030743355],"category_scores_gemma":[0.000037191538,0.000073756215,0.000022362901,0.00018849448,0.00003602698,0.00014602447,0.00001050118,0.00006788028,0.0000017255877],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013262234,0.0004925607,0.5004684,0.00009505806,0.00020127774,0.00006588845,0.07212872,0.0030993526,0.16987538,0.0002538512,0.00060125504,0.25258565],"study_design_scores_gemma":[0.0018423345,0.00041641112,0.5617715,0.0002726034,0.00008669146,0.000167493,0.011702617,0.04531098,0.3771586,0.0006896538,0.00015125648,0.00042981122],"about_ca_topic_score_codex":0.0033772062,"about_ca_topic_score_gemma":0.0031262962,"teacher_disagreement_score":0.2521558,"about_ca_system_score_codex":0.00003359007,"about_ca_system_score_gemma":0.000010140341,"threshold_uncertainty_score":0.5105348},"labels":[],"label_agreement":null},{"id":"W2903926597","doi":"10.1007/978-3-030-01614-2_3","title":"Environmental Factors on Concept Maps Design","year":2018,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; École de Technologie Supérieure","funders":"McGill University","keywords":"Computer science; Knowledge management; Building information modeling; Work (physics); Quality (philosophy); Ontology; Data science; Engineering","score_opus":0.007490954964346386,"score_gpt":0.20051893267809245,"score_spread":0.19302797771374608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903926597","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013450051,0.023988657,0.03491788,0.00034194606,0.0009770227,0.0011730612,0.00020380951,0.0015430101,0.9355096],"genre_scores_gemma":[0.86764103,0.11056977,0.008018594,0.0003848923,0.00007071995,0.0002480585,0.0017730858,0.0000969481,0.011196882],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99928397,0.000011812182,0.0004083368,0.00009071237,0.00010005185,0.00010509026],"domain_scores_gemma":[0.99932736,0.00005067042,0.0001519221,0.00042472262,0.000022164839,0.00002315203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006005719,0.00020456164,0.00017792342,0.0004959397,0.00008287205,0.000027633856,0.00024409333,0.00043619965,0.00031432207],"category_scores_gemma":[0.000010314765,0.00020629981,0.000024991263,0.000051070863,0.00036739704,0.0006363792,0.00004714435,0.00043862424,0.00013050322],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011257773,0.0000051473453,0.00003594941,0.000018537505,0.000015855194,1.3559594e-7,0.00056604133,0.0006258937,0.0000073164874,0.47451714,0.0007459053,0.5234508],"study_design_scores_gemma":[0.00026386787,0.00008190864,0.000022493157,0.00010941572,0.0000070592573,0.000009360016,0.0007627467,0.0009996679,0.0008793132,0.11256101,0.88403046,0.0002726845],"about_ca_topic_score_codex":5.0963297e-7,"about_ca_topic_score_gemma":0.000006031412,"teacher_disagreement_score":0.9243127,"about_ca_system_score_codex":0.00012629382,"about_ca_system_score_gemma":0.000009288439,"threshold_uncertainty_score":0.8412662},"labels":[],"label_agreement":null},{"id":"W2905178858","doi":"","title":"An integrated simulation model for site layout planning of tunnelling projects","year":2014,"lang":"en","type":"article","venue":"Northumbria Research Link (Northumbria University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Quantum tunnelling; Geology; Computer science; Construction engineering; Engineering","score_opus":0.06467313376961577,"score_gpt":0.29899372809522323,"score_spread":0.23432059432560748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905178858","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5414254,0.000017491306,0.45464176,0.000013963651,0.00013439164,0.00044870097,0.00005227861,0.00024729388,0.0030187203],"genre_scores_gemma":[0.99485666,0.000014932802,0.0038358623,0.0000065594063,0.00021577359,0.000007393102,0.00018131163,0.000052805513,0.0008287005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99818593,0.0002038183,0.00033604828,0.00038569898,0.0004031204,0.00048536688],"domain_scores_gemma":[0.99806684,0.00032462203,0.00008968647,0.00043067263,0.0009119883,0.00017617585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008134798,0.00022120062,0.00029589576,0.0009028492,0.00031890767,0.00007400123,0.00036789526,0.00023909374,0.000020518968],"category_scores_gemma":[0.00013081977,0.00024253277,0.00012741132,0.0008629917,0.00015753391,0.00055238744,0.000037389997,0.00047779846,0.000010654465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002153914,0.000032680644,0.005268194,0.00010611796,0.000052976626,0.0000022343072,0.0013624089,0.9642315,0.0034277393,0.008860529,0.00005363386,0.016386578],"study_design_scores_gemma":[0.00080549094,0.00015734418,0.00041341668,0.00008847278,0.000029388104,0.0000013890337,0.00057170173,0.9896908,0.00078124413,0.0007537691,0.006464581,0.00024239975],"about_ca_topic_score_codex":0.00013414743,"about_ca_topic_score_gemma":0.0005351081,"teacher_disagreement_score":0.45343128,"about_ca_system_score_codex":0.00013937817,"about_ca_system_score_gemma":0.0001776955,"threshold_uncertainty_score":0.98901993},"labels":[],"label_agreement":null},{"id":"W2905893137","doi":"","title":"A conceptual framework for tracking design completeness of Track Line discipline in MRT projects","year":2018,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Completeness (order theory); Tracking (education); Computer science; Track (disk drive); Conceptual framework; Sociology; Mathematics; Epistemology; Philosophy","score_opus":0.07465494436732617,"score_gpt":0.2961617520021516,"score_spread":0.22150680763482544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905893137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13886483,0.000034859197,0.8599409,0.000038109603,0.00027928318,0.0002809049,0.000009108878,0.00008662572,0.00046538975],"genre_scores_gemma":[0.9038889,0.000002845701,0.095820434,0.000017247217,0.00017960672,0.000044711167,0.000006455904,0.000012840702,0.000026991174],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945235,0.0000137504085,0.00024420407,0.00010027089,0.00006339462,0.00012603264],"domain_scores_gemma":[0.99964786,0.00012456888,0.000028009397,0.000087743385,0.00009109911,0.00002072582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000115548435,0.00008386952,0.00014581603,0.000068411755,0.000025215599,0.000011705195,0.00006325581,0.00008783213,0.00009216242],"category_scores_gemma":[0.000047169582,0.00007166632,0.000032126572,0.00017405205,0.000101674435,0.000093047034,0.0000052871974,0.00008065529,0.0000037288503],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040473937,0.00020061889,0.003029382,0.00028007437,0.00010930388,0.0000017065138,0.012737088,0.024581285,0.07151989,0.7129195,0.0011420039,0.17307441],"study_design_scores_gemma":[0.0016036441,0.0005974549,0.0031500363,0.00033711686,0.000028093104,0.000011709127,0.0046791686,0.5642786,0.39374974,0.029796395,0.0013112695,0.0004567305],"about_ca_topic_score_codex":0.000008363251,"about_ca_topic_score_gemma":0.0000854556,"teacher_disagreement_score":0.765024,"about_ca_system_score_codex":0.000020179536,"about_ca_system_score_gemma":0.00001812376,"threshold_uncertainty_score":0.29224676},"labels":[],"label_agreement":null},{"id":"W2909176525","doi":"","title":"RESILIENCE-BASED BLAST DESIGN OF REINFORCED CONCRETE MASONRY SYSTEMS","year":2018,"lang":"en","type":"dissertation","venue":"MacSphere (McMaster University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"U.S. Department of Homeland Security; Federal Emergency Management Agency; Graduate School, University of Maryland; Canada Masonry Design Centre; Natural Sciences and Engineering Research Council of Canada; McMaster University","keywords":"Resilience (materials science); Masonry; Unreinforced masonry building; Engineering; Structural engineering; Forensic engineering; Geotechnical engineering; Civil engineering; Materials science; Composite material","score_opus":0.009681655805914546,"score_gpt":0.18020822207963072,"score_spread":0.17052656627371618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909176525","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008313787,0.00026933,0.1091365,0.0000038062303,0.0026815534,0.0006544938,0.00006291595,0.0004123816,0.87846524],"genre_scores_gemma":[0.15219726,0.00013484496,0.003002666,0.000012281326,0.00023524591,0.00000715709,0.0003843607,0.000110558896,0.84391564],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989452,0.00006356014,0.00029077518,0.000249645,0.00023423339,0.00021658954],"domain_scores_gemma":[0.999224,0.000044065953,0.00018528868,0.0002522538,0.00021570169,0.00007871141],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006673528,0.00029019118,0.0003337588,0.00040068547,0.000074486205,0.000044634406,0.00028746843,0.00041154274,0.013793545],"category_scores_gemma":[0.0000071642885,0.0003301004,0.000110029774,0.00060955755,0.000083760395,0.00018438966,0.000010418868,0.00022534799,0.00007001612],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0041669407,0.000017432378,0.0004901653,0.007937729,0.0016267073,0.00018394899,0.003343731,0.53589565,0.10672021,0.024009515,0.050866388,0.2647416],"study_design_scores_gemma":[0.0023465266,0.0004655982,0.00011941762,0.0021555703,0.00047241274,0.000012638187,0.013771937,0.58752805,0.058386877,0.000021315893,0.33322647,0.0014931743],"about_ca_topic_score_codex":0.00006219197,"about_ca_topic_score_gemma":0.000043905617,"teacher_disagreement_score":0.28236008,"about_ca_system_score_codex":0.0001147057,"about_ca_system_score_gemma":0.00011035387,"threshold_uncertainty_score":0.9999151},"labels":[],"label_agreement":null},{"id":"W2909687747","doi":"10.18280/mmep.050408","title":"Energy savings in transportation: Setting up an innovative SHM method","year":2018,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Transport engineering; Computer science; Engineering; Mathematics","score_opus":0.015989762700554237,"score_gpt":0.22495417581633861,"score_spread":0.20896441311578437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909687747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1103459,0.00006824143,0.8885262,0.000021456464,0.00013130254,0.000057362096,0.000002366359,0.00028513413,0.0005620205],"genre_scores_gemma":[0.87691426,0.000015375575,0.12285322,0.000013388883,0.00007908289,0.000036729092,0.000008731525,0.000032659224,0.00004652578],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919665,0.000009842245,0.00033103535,0.00015444637,0.000098978104,0.00020903653],"domain_scores_gemma":[0.9997022,0.000047248413,0.000020917905,0.00010217386,0.00006427623,0.00006317299],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021628125,0.00015989711,0.0001776537,0.0001391516,0.000040844356,0.00004739911,0.000057969384,0.000103596925,0.000024081817],"category_scores_gemma":[0.000006857291,0.00015608639,0.000019169025,0.000308816,0.000027457276,0.0002035166,0.0000038388016,0.00016223699,0.0000034597128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033660601,0.000013423647,0.000020177,0.00024423105,0.000018120201,8.4573253e-7,0.005579027,0.87843335,0.0025251627,0.095233485,0.000009436585,0.017919373],"study_design_scores_gemma":[0.00013915583,0.000028375536,0.000019016672,0.00017444318,0.000006287664,0.000010074777,0.00012495588,0.9826859,0.0021449232,0.014026508,0.0004575833,0.00018272709],"about_ca_topic_score_codex":0.000018189307,"about_ca_topic_score_gemma":0.000010453066,"teacher_disagreement_score":0.76656836,"about_ca_system_score_codex":0.000024881176,"about_ca_system_score_gemma":0.000006683548,"threshold_uncertainty_score":0.6365018},"labels":[],"label_agreement":null},{"id":"W2909948712","doi":"10.3390/app9020310","title":"Data Sensing and Processing Tensioning System Based on the Internet of Things","year":2019,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Petroleum Technology Research Centre; Guizhou Science and Technology Department; National Natural Science Foundation of China","keywords":"Precast concrete; Data acquisition; Computer science; Application layer; Real-time computing; Android (operating system); Process (computing); Data processing; Engineering; Database; Structural engineering; Operating system; Software","score_opus":0.018580586424551307,"score_gpt":0.20849206592769645,"score_spread":0.18991147950314513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909948712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9102663,0.000070087175,0.026133507,0.00010848813,0.00024738465,0.00014788272,0.0000015313325,0.00012141689,0.06290345],"genre_scores_gemma":[0.9977826,4.250159e-7,0.0021361755,0.000057905778,0.000010301874,6.594131e-7,0.0000010351206,0.000002886105,0.000008021801],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996074,0.0000058790156,0.00008481147,0.00011778815,0.00012257708,0.00006156949],"domain_scores_gemma":[0.9997655,0.000059351467,0.000029690029,0.00012298551,0.000012872129,0.000009592395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030890811,0.000044582855,0.000056074634,0.000036305206,0.000065906825,0.000061157996,0.00013131526,0.00001830913,0.0000048533348],"category_scores_gemma":[0.000006466952,0.000026627247,0.0000047235567,0.00012970484,0.00009182285,0.00010830013,0.000023643628,0.00005594555,0.000004641751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027968192,0.0000123461605,0.0037053358,0.0007734984,0.000026320697,0.0000012063222,0.0036790431,0.025934715,0.19675304,0.2546085,0.001000591,0.5134774],"study_design_scores_gemma":[0.000035248995,0.000006570433,0.00011268791,0.00012957519,0.000002769484,0.0000030449742,0.001823247,0.99099666,0.0066557974,0.000077074554,0.00011882501,0.00003852333],"about_ca_topic_score_codex":0.0000127890735,"about_ca_topic_score_gemma":0.0000022479983,"teacher_disagreement_score":0.9650619,"about_ca_system_score_codex":0.000006781888,"about_ca_system_score_gemma":0.000013363303,"threshold_uncertainty_score":0.108582765},"labels":[],"label_agreement":null},{"id":"W2911311605","doi":"10.1016/j.autcon.2019.01.010","title":"Building information modelling for off-site construction: Review and future directions","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":410,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Data science; Computer science; Scopus; Prefabrication; Engineering; Civil engineering","score_opus":0.005405755476567432,"score_gpt":0.2094625117056206,"score_spread":0.20405675622905317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911311605","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34812173,0.02049174,0.60447335,0.0016864154,0.011037767,0.003503394,0.00012396733,0.0020871542,0.008474502],"genre_scores_gemma":[0.43387145,0.07638883,0.48535737,0.00074330426,0.001527112,0.0012696151,0.0006001376,0.0001260599,0.00011610992],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989818,0.00002675209,0.00052753865,0.00017082189,0.00012761365,0.0001654892],"domain_scores_gemma":[0.9994673,0.000044061097,0.00012899282,0.00015381549,0.00016220481,0.000043638036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018355511,0.00017113205,0.00023049729,0.0003376944,0.00011109957,0.000083062136,0.000045419958,0.00015699444,0.000119982964],"category_scores_gemma":[0.000012936372,0.00018944163,0.000056156776,0.00043981613,0.000050920567,0.0016123326,0.000008479803,0.00017719349,0.00003181203],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010219128,0.00000478752,0.0016558947,0.0011959113,0.00003363543,7.083932e-8,0.00022226755,0.012979497,0.00025208003,0.089022696,0.00033421646,0.8942887],"study_design_scores_gemma":[0.0009833403,0.00003423907,0.001703816,0.00054469693,0.000096642405,0.00032519145,0.000525761,0.7005902,0.00042383012,0.0046841963,0.2896422,0.00044591227],"about_ca_topic_score_codex":0.000010722308,"about_ca_topic_score_gemma":0.000007301324,"teacher_disagreement_score":0.8938428,"about_ca_system_score_codex":0.00012546591,"about_ca_system_score_gemma":0.000028133747,"threshold_uncertainty_score":0.77252054},"labels":[],"label_agreement":null},{"id":"W2912791728","doi":"","title":"Proceedings of the 10th international conference on Mathematics of program construction","year":2010,"lang":"en","type":"article","venue":"Mathematics of Program Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Computer science; Mathematics education; Software engineering; Engineering; Mathematics","score_opus":0.015977880914499677,"score_gpt":0.2525470684546176,"score_spread":0.23656918754011794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2912791728","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9682492,0.000008523426,0.0015790224,0.000071723254,0.0018718696,0.0011034434,0.00003192368,0.0003026914,0.026781585],"genre_scores_gemma":[0.73675907,0.000018388084,0.26300883,0.0000014357439,0.000061304585,0.00009951367,0.000005441886,0.000022526454,0.000023494256],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983458,0.0000071144846,0.0008452715,0.00016715686,0.00046839274,0.00016629627],"domain_scores_gemma":[0.99831325,0.00003767603,0.00063123135,0.00025551306,0.00071641273,0.00004593771],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020300913,0.00021998465,0.00034501034,0.0001911031,0.00005359173,0.000049822553,0.00032050896,0.00021045294,0.00013574364],"category_scores_gemma":[0.00009866607,0.00017387784,0.00016455095,0.00036148878,0.00077052595,0.00019680447,0.00003979842,0.00036061183,0.0000034385403],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013057385,0.0004023296,0.0012014299,0.0008510725,0.00012757773,7.9614026e-8,0.00076768314,0.000033249275,0.10174314,0.6812984,0.00006808026,0.21349391],"study_design_scores_gemma":[0.0014110118,0.0005771907,0.0012094125,0.0012884806,0.0002849547,0.00051822327,0.010893664,0.118385136,0.72139174,0.14217997,0.0012173773,0.0006428393],"about_ca_topic_score_codex":0.0000054161633,"about_ca_topic_score_gemma":0.000008639501,"teacher_disagreement_score":0.6196486,"about_ca_system_score_codex":0.000030288484,"about_ca_system_score_gemma":0.00004662088,"threshold_uncertainty_score":0.7090532},"labels":[],"label_agreement":null},{"id":"W2913423770","doi":"10.1139/cjce-2018-0349","title":"Framework for developing labour-hour prediction models from project design features: case study in structural steel fabrication","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Computer science; Regression analysis; Range (aeronautics); Linear regression; Work (physics); Predictive modelling; Industrial engineering; Point (geometry); Regression; Data mining; Operations research; Engineering; Machine learning; Mathematics; Statistics; Mechanical engineering","score_opus":0.021644773565291445,"score_gpt":0.2281888556729337,"score_spread":0.20654408210764225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2913423770","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5124528,0.00033018892,0.48551938,0.000012093808,0.0012151495,0.00038727664,0.000024601637,0.000030602536,0.000027935936],"genre_scores_gemma":[0.9812683,0.000008379747,0.018386813,0.000008944576,0.00025298406,0.000025542566,0.000004567853,0.000035542245,0.000008941548],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991419,0.00002223028,0.00037621194,0.00011724438,0.00011203004,0.00023043217],"domain_scores_gemma":[0.9994359,0.00009873364,0.000075490774,0.00011655403,0.00015913042,0.00011418554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018689217,0.00015573447,0.0002053017,0.00050151773,0.000047149326,0.00008335348,0.000112974856,0.00012790087,0.00001745764],"category_scores_gemma":[0.00007275622,0.00016066899,0.000049886105,0.00029209544,0.000005880002,0.0004457137,0.0000030638032,0.0003562382,7.5301807e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010256238,0.0000024569506,0.0029504562,0.000043239233,0.00007424652,0.00007987638,0.0030044187,0.98891664,0.00022695045,0.0021904157,0.000100466474,0.0024005584],"study_design_scores_gemma":[0.0011897146,0.0001702614,0.018913338,0.000494647,0.000051584917,0.001055136,0.005817686,0.966722,0.0003536263,0.0044544605,0.00035877936,0.00041874364],"about_ca_topic_score_codex":0.0018412804,"about_ca_topic_score_gemma":0.04093155,"teacher_disagreement_score":0.4688155,"about_ca_system_score_codex":0.00044950857,"about_ca_system_score_gemma":0.00035327146,"threshold_uncertainty_score":0.97656894},"labels":[],"label_agreement":null},{"id":"W2914120926","doi":"10.29173/mocs57","title":"Modelling and analysis of two production solutions for precast concrete elements: a petri-nets approach","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Production (economics); Upgrade; Automation; Productivity; Computer science; Factory (object-oriented programming); Lead time; Operations research; Industrial engineering; Risk analysis (engineering); Engineering; Civil engineering; Operations management; Business; Mechanical engineering","score_opus":0.025329505509203997,"score_gpt":0.23162227908016897,"score_spread":0.20629277357096498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914120926","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74533117,0.00055985677,0.25186786,0.000059284823,0.0004188417,0.00049002224,0.00006952386,0.0001421043,0.00106132],"genre_scores_gemma":[0.96421176,0.00029027727,0.035076786,0.000006179159,0.00013493627,0.00009410158,0.000055662018,0.000023970446,0.000106352745],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865806,0.0000075391267,0.00044505834,0.00042708073,0.00018072467,0.0002815073],"domain_scores_gemma":[0.9990435,0.000012523579,0.00026422198,0.00019361904,0.000392973,0.00009314733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000293904,0.00023003809,0.00038393043,0.00045611325,0.00069099077,0.00023256792,0.000109323795,0.00012682163,0.000009793685],"category_scores_gemma":[0.000045676643,0.00023934274,0.00012833359,0.00028256627,0.00031640605,0.00080483395,0.00004410945,0.00015001291,4.479039e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005018212,0.00009960382,0.1478499,0.002676113,0.008783225,0.0000015535917,0.00362941,0.22307386,0.12663111,0.14158578,0.0014319969,0.34373564],"study_design_scores_gemma":[0.00074769335,0.000043492582,0.0011466735,0.000051636966,0.0009546187,0.000033375134,0.000703983,0.9890542,0.004848846,0.00089245697,0.0012406425,0.0002823941],"about_ca_topic_score_codex":0.000044950866,"about_ca_topic_score_gemma":0.000011318841,"teacher_disagreement_score":0.7659803,"about_ca_system_score_codex":0.000046568188,"about_ca_system_score_gemma":0.000014936364,"threshold_uncertainty_score":0.9760114},"labels":[],"label_agreement":null},{"id":"W2914157240","doi":"","title":"Proceedings of the Symposium on Simulation for Architecture & Urban Design","year":2013,"lang":"en","type":"article","venue":"Spring Simulation Multiconference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Privilege (computing); Presentation (obstetrics); Honor; Architecture; Computer science; Panel discussion; Work (physics); Operations research; Library science; Engineering ethics; Engineering; History; Medicine; Computer security; Internet privacy","score_opus":0.01876415900115818,"score_gpt":0.2278807952504878,"score_spread":0.2091166362493296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914157240","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48596153,0.0000089778105,0.5114637,0.00007719849,0.00030624255,0.0011586514,0.0000033772844,0.00016793008,0.00085237663],"genre_scores_gemma":[0.9958722,9.759017e-7,0.0038655533,0.00002009397,0.00006827779,0.000083237945,0.0000010879078,0.00001808079,0.00007049384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937105,0.000008727668,0.00023013464,0.00013269314,0.0001318654,0.00012554899],"domain_scores_gemma":[0.9992901,0.00023612546,0.00007557479,0.000114251576,0.00025505802,0.000028901335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006655461,0.00012166537,0.00009980982,0.00006898203,0.000079768375,0.000053800773,0.00011704662,0.00008091372,0.000024130635],"category_scores_gemma":[0.000086917025,0.00009302778,0.00005872583,0.00010859013,0.00003421828,0.00015833128,0.000009679402,0.000112785056,0.000009570731],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013376897,0.000007920439,0.0014414984,0.00003996508,0.000009131298,3.7037047e-9,0.00026819095,0.9577894,0.028245062,0.0038060143,0.000016692538,0.008362736],"study_design_scores_gemma":[0.00035099874,0.000026587912,0.012876005,0.00006437886,0.000010826732,1.2319042e-7,0.00003163333,0.954209,0.031126788,0.0009037306,0.00029849235,0.00010142272],"about_ca_topic_score_codex":0.000010503357,"about_ca_topic_score_gemma":0.0000012375266,"teacher_disagreement_score":0.50991064,"about_ca_system_score_codex":0.000037986178,"about_ca_system_score_gemma":0.00001199329,"threshold_uncertainty_score":0.3793563},"labels":[],"label_agreement":null},{"id":"W2915459067","doi":"","title":"Transportation Research and Analysis Computing Center (TRACC) Year 6 Quarter 4 Progress Report","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Center (category theory); Computer science; Transport engineering; Engineering; Geography; Archaeology","score_opus":0.016284628334663317,"score_gpt":0.2728734423810821,"score_spread":0.25658881404641876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915459067","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9769858,0.000038977727,0.016100505,0.00013394837,0.00008903341,0.00012429491,0.000001921173,0.00014221977,0.006383285],"genre_scores_gemma":[0.9977066,0.0000047598005,0.0019776162,0.000004762846,0.000035723155,0.000012697142,0.000039164213,0.000005850294,0.00021284388],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994796,0.000010076605,0.00016385264,0.00010819831,0.00012426211,0.00011403042],"domain_scores_gemma":[0.9997369,0.000011619771,0.000012861846,0.00008812709,0.00011332524,0.00003714468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000096739735,0.000049341816,0.000071065704,0.00014744847,0.000044036464,0.00007408358,0.000026208032,0.00004233376,0.00033479003],"category_scores_gemma":[0.0000013904923,0.000042230324,0.000026790583,0.00028700786,0.000038137037,0.00014630868,0.00000160198,0.00009648314,0.000031977703],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003212579,0.000027887663,0.94862026,0.000047388774,0.00025560052,0.00000864889,0.0007781458,0.00024560373,0.00032052395,0.003347973,0.0046024704,0.041742273],"study_design_scores_gemma":[0.00019617696,0.000027318867,0.9318193,0.000011988939,0.000040081035,0.000012486467,0.0011698683,0.06374897,0.000616299,0.00050586386,0.0017134643,0.00013816585],"about_ca_topic_score_codex":0.00008317727,"about_ca_topic_score_gemma":0.00011659645,"teacher_disagreement_score":0.06350337,"about_ca_system_score_codex":0.000011656089,"about_ca_system_score_gemma":0.0000029036905,"threshold_uncertainty_score":0.36657164},"labels":[],"label_agreement":null},{"id":"W2918609961","doi":"10.1139/cjce-2018-0020","title":"A framework for total productivity measurement of industrial construction projects","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs","keywords":"Productivity; Project management; Construction industry; Construction management; Metric (unit); Earned value management; Session (web analytics); Project management triangle; Engineering; Engineering management; Computer science; Operations management; Process management; Systems engineering; Construction engineering; OPM3; Civil engineering; Economics","score_opus":0.02229212532759527,"score_gpt":0.1917701409583028,"score_spread":0.16947801563070752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918609961","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75193083,0.00068211305,0.23625599,0.00009550318,0.0095125185,0.0005304379,0.000024418077,0.000045195404,0.0009229822],"genre_scores_gemma":[0.9965085,0.0000025192153,0.003017286,0.0000015522122,0.00043963967,0.000006116294,7.151756e-7,0.000018500386,0.000005203213],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992979,0.0000072397884,0.0002942664,0.000068701906,0.00015960241,0.00017224539],"domain_scores_gemma":[0.9993855,0.000024207357,0.00009007352,0.00009363507,0.0002630522,0.00014354028],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002576931,0.00010168022,0.0001937827,0.00028135374,0.000019544637,0.00002166257,0.000068172834,0.000113658345,0.000059927883],"category_scores_gemma":[0.00021722,0.000105411804,0.000084303196,0.00017596783,0.00001884547,0.00017707281,0.0000017881231,0.00025648723,0.0000010544085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010762526,0.000026796437,0.022238594,0.00095806376,0.00078136625,0.000010030786,0.0015719896,0.7840969,0.05636412,0.05620813,0.0024716998,0.07516468],"study_design_scores_gemma":[0.01699224,0.004123177,0.028681204,0.015156019,0.0011374183,0.0059250193,0.0054599484,0.28809717,0.49222073,0.021322671,0.1152871,0.0055973185],"about_ca_topic_score_codex":0.000060824674,"about_ca_topic_score_gemma":0.0022530402,"teacher_disagreement_score":0.49599972,"about_ca_system_score_codex":0.00022553696,"about_ca_system_score_gemma":0.0004291071,"threshold_uncertainty_score":0.42985687},"labels":[],"label_agreement":null},{"id":"W2918813191","doi":"","title":"Framework for Scheduling, Controlling, and Delivery Planning for Scattered Repetitive Infrastructure Rehabilitation Projects","year":2019,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rehabilitation; Scheduling (production processes); Infrastructure planning; Computer science; Process management; Engineering; Engineering management; Operations management; Systems engineering; Medicine; Construction engineering; Physical therapy","score_opus":0.007979555117976225,"score_gpt":0.21001979232751775,"score_spread":0.2020402372095415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918813191","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97437954,0.0003306094,0.022803014,0.00011150697,0.0008352977,0.001199295,0.00015343778,0.000105416606,0.00008188623],"genre_scores_gemma":[0.74491704,0.00013759786,0.23219736,0.000022700218,0.00020302627,0.00002757853,0.0018099977,0.00010103567,0.020583648],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9992603,0.00001689141,0.00014749132,0.00029194148,0.00010632696,0.00017706925],"domain_scores_gemma":[0.99909824,0.00021470337,0.00017947442,0.0001499994,0.0003157499,0.000041826934],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0000873652,0.00021396475,0.0003502256,0.00023761408,0.00013807278,0.000029960913,0.000102362166,0.00048493675,0.000018416378],"category_scores_gemma":[0.00006695174,0.00025459364,0.00014017391,0.000078693534,0.00005188081,0.00021047571,0.00000826337,0.00022133255,0.0000018228735],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0065470072,0.00008701493,0.009020655,0.019667346,0.0020734784,0.0000058975775,0.76029885,0.046264626,0.027909236,0.038446084,0.0063102166,0.08336962],"study_design_scores_gemma":[0.0056569767,0.0012727471,0.0107680075,0.0045444844,0.0009637728,0.000007201139,0.8250031,0.12498919,0.0061640604,0.016777666,0.0023408225,0.0015120079],"about_ca_topic_score_codex":0.00030690458,"about_ca_topic_score_gemma":0.00069176423,"teacher_disagreement_score":0.22946247,"about_ca_system_score_codex":0.0000740721,"about_ca_system_score_gemma":0.000056217872,"threshold_uncertainty_score":0.99999064},"labels":[],"label_agreement":null},{"id":"W2919200533","doi":"10.7202/1056303ar","title":"Comprendre l’impact du numérique sur la gestion de projet en construction","year":2019,"lang":"fr","type":"article","venue":"Lien social et Politiques","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.00902906843565926,"score_gpt":0.26627580519415134,"score_spread":0.2572467367584921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2919200533","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84369993,0.00048669384,0.00707554,0.0060022785,0.002073867,0.00038708243,0.00022437966,0.0005089277,0.1395413],"genre_scores_gemma":[0.99367094,0.00060911936,0.0020342025,0.000102317616,0.0014902839,0.000031149935,0.00009225581,0.00004997535,0.0019197323],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9982525,0.0006358799,0.00031538765,0.00022019808,0.00016316723,0.00041288478],"domain_scores_gemma":[0.99930125,0.00019355204,0.00010476282,0.000120746896,0.00017126347,0.00010842953],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039494806,0.0002594002,0.00028812952,0.000108094406,0.00009758523,0.00018120522,0.00010444642,0.0006882469,0.0006242973],"category_scores_gemma":[0.00007414275,0.0002926904,0.00019194235,0.00015088315,0.00016861981,0.0006820489,0.000025909945,0.0006196363,0.00012063954],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002640247,0.000049581737,0.031014262,0.00019552604,0.00010882813,0.000004375672,0.018661117,0.00058407424,0.001297965,0.9116423,0.00426767,0.032147855],"study_design_scores_gemma":[0.0035651948,0.00071885565,0.35526812,0.0015781843,0.0002149416,0.002359108,0.052552834,0.039959926,0.013647573,0.24242142,0.28488567,0.0028281678],"about_ca_topic_score_codex":0.008419493,"about_ca_topic_score_gemma":0.00031135458,"teacher_disagreement_score":0.6692209,"about_ca_system_score_codex":0.0007071392,"about_ca_system_score_gemma":0.0002898663,"threshold_uncertainty_score":0.9999525},"labels":[],"label_agreement":null},{"id":"W2920370767","doi":"10.1007/978-3-030-10510-5_13","title":"Achieving Quality in Concrete Construction","year":2019,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"IBI Group (Canada)","funders":"","keywords":"Quality assurance; Quality (philosophy); Quality control; Control (management); Construction engineering; Engineering; Plan (archaeology); Civil engineering; Reliability engineering; Risk analysis (engineering); Computer science; Operations management; Business","score_opus":0.014649543088671585,"score_gpt":0.22068574936695648,"score_spread":0.2060362062782849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920370767","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016856657,0.00023826481,0.0021586365,0.000021272404,0.0014105027,0.00014989224,0.000015112336,0.00026305713,0.9940576],"genre_scores_gemma":[0.13511345,0.0006602988,0.0033821738,0.00012867396,0.00051069027,0.000014844335,0.000147742,0.00015288698,0.85988927],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992384,0.000008178556,0.00035934726,0.00016869158,0.000117736236,0.00010768112],"domain_scores_gemma":[0.9996608,0.000033237626,0.00005537332,0.00018822182,0.000034468085,0.000027903176],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000089702866,0.00019418038,0.0002601667,0.0001477125,0.000015134844,0.00002605052,0.000060205337,0.00035608944,0.0017720903],"category_scores_gemma":[0.000005078458,0.00019910408,0.000077566045,0.000019981406,0.000048605754,0.000099963916,0.000010822668,0.00039083866,0.00036798615],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004062567,1.4889727e-7,0.00026715596,0.00007233486,0.00002631148,7.9109225e-7,0.000020082438,0.00010397154,0.0004060478,0.9664382,0.00041476268,0.032246184],"study_design_scores_gemma":[0.001725912,0.0000751345,0.0022612042,0.0011175523,0.0000981881,0.00017486801,0.0003615378,0.0059851096,0.0013180133,0.03576884,0.9483291,0.0027845185],"about_ca_topic_score_codex":0.00002194377,"about_ca_topic_score_gemma":0.00007100383,"teacher_disagreement_score":0.94791436,"about_ca_system_score_codex":0.00011663259,"about_ca_system_score_gemma":0.000031957665,"threshold_uncertainty_score":0.99914044},"labels":[],"label_agreement":null},{"id":"W2921270821","doi":"10.1139/cjce-2018-0462","title":"Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Context (archaeology); Prefabrication; Build to order; Engineering; Lean construction; Production (economics); Order (exchange); Construction engineering; Set (abstract data type); Quality (philosophy); Systems engineering; Manufacturing engineering; Architectural engineering; Computer science; Civil engineering; Construction industry; Operations management; Business","score_opus":0.02174191597938278,"score_gpt":0.19712275131129162,"score_spread":0.17538083533190885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921270821","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7133113,0.005100889,0.28113678,0.00002307678,0.00024649355,0.00013086609,0.000010656074,0.000018224026,0.000021677879],"genre_scores_gemma":[0.9973033,0.00008063297,0.0024657398,0.0000045757674,0.00009944415,0.000010508713,7.218888e-7,0.000029938485,0.000005138548],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929786,0.0000059342447,0.00031919708,0.000088601024,0.000079858204,0.00020853154],"domain_scores_gemma":[0.9993693,0.00016756041,0.00006382698,0.00007168559,0.00012123961,0.0002063377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024839057,0.00013882072,0.0002747674,0.00035735936,0.000054710352,0.0000767115,0.00007709406,0.00005832915,7.3592497e-7],"category_scores_gemma":[0.00006272562,0.000121691286,0.000029645047,0.00013037668,0.000016748365,0.0002656813,0.000007765702,0.0001696566,7.947111e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039364513,3.1589252e-7,0.0024554816,0.00018256118,0.00009012806,0.0000010824349,0.00069309294,0.9884109,0.005817044,0.0012362296,0.0000084707335,0.0011007949],"study_design_scores_gemma":[0.00033996237,0.000037628666,0.0016357146,0.00050816796,0.000053807635,0.000036596488,0.00054226135,0.99578154,0.0006572795,0.000035788828,0.00022506299,0.00014617726],"about_ca_topic_score_codex":0.000106228144,"about_ca_topic_score_gemma":0.000332206,"teacher_disagreement_score":0.28399196,"about_ca_system_score_codex":0.00005060737,"about_ca_system_score_gemma":0.000057735175,"threshold_uncertainty_score":0.49624267},"labels":[],"label_agreement":null},{"id":"W2921337194","doi":"","title":"Gérer en mode gestion de projet : Microsoft Office Project 2010","year":2011,"lang":"fr","type":"book","venue":"Loze-Dion éditeur eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.01823271612243796,"score_gpt":0.2272560052414302,"score_spread":0.20902328911899223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921337194","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020024892,0.0021676077,0.07359391,0.0005500084,0.0171347,0.004609698,0.0008361773,0.0027033247,0.8783797],"genre_scores_gemma":[0.019957379,0.00032272056,0.019351775,0.00018937218,0.0033637225,0.00050711696,0.00057110627,0.00043376166,0.9553031],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99628586,0.00040843312,0.0010185065,0.00091143657,0.00046637203,0.0009094126],"domain_scores_gemma":[0.9980172,0.00019759378,0.00038617678,0.00081213337,0.00034314572,0.00024375312],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000544887,0.0010389929,0.0007395427,0.0005945785,0.00029791152,0.00019547381,0.00051673554,0.002231689,0.0005250548],"category_scores_gemma":[0.000095831885,0.0011233661,0.00043519068,0.00012705303,0.00035327955,0.00029113836,0.00010728067,0.0022249052,0.0012236756],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005719968,0.00019702542,0.0005261274,0.0031646807,0.00096573227,0.00016467275,0.010980798,0.002167747,0.09317444,0.1775287,0.14744036,0.56311774],"study_design_scores_gemma":[0.0008543628,0.00023160645,0.000467192,0.0013412456,0.00043649448,0.0007585648,0.0001702572,0.01040436,0.016712628,0.0035395713,0.96351117,0.00157254],"about_ca_topic_score_codex":0.0014824304,"about_ca_topic_score_gemma":0.0005660112,"teacher_disagreement_score":0.8160708,"about_ca_system_score_codex":0.0013851082,"about_ca_system_score_gemma":0.0012794988,"threshold_uncertainty_score":0.999554},"labels":[],"label_agreement":null},{"id":"W2921875200","doi":"","title":"Quelle place pour la planification et l'improvisation en gestion de projet? : une exploration à partir de projets en arts visuels","year":2018,"lang":"fr","type":"article","venue":"Archipelago (University of Quebec in Montreal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Art; Political science","score_opus":0.012755556333840264,"score_gpt":0.22083763540932755,"score_spread":0.2080820790754873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921875200","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7740335,0.000097401215,0.21171427,0.010666027,0.00019513317,0.0004362566,0.000026593994,0.000094002266,0.0027368634],"genre_scores_gemma":[0.98407125,0.0002482876,0.012893313,0.000023808545,0.00014968895,0.000007304088,0.000099694706,0.000023432714,0.0024832443],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99812925,0.0007896559,0.0002655131,0.00029306597,0.00018862882,0.00033386197],"domain_scores_gemma":[0.9990632,0.00030207323,0.00018017628,0.0002198719,0.00013315411,0.00010150902],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009399505,0.00020396485,0.00020961538,0.0002915228,0.00015619435,0.000049890736,0.0001664511,0.00039886797,0.00006239651],"category_scores_gemma":[0.00011140068,0.0002782929,0.000069481415,0.00033660769,0.00024634303,0.0009888702,0.000037169888,0.0004043012,0.00007371766],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025576152,0.00019646925,0.002155293,0.00021696027,0.000059804337,0.0000189267,0.26839375,0.009806436,0.018053738,0.05598523,0.0011228393,0.64373475],"study_design_scores_gemma":[0.0020716607,0.00027916068,0.41924307,0.0007422689,0.00020398102,0.00007197815,0.083644636,0.40224954,0.009262617,0.07768107,0.003940465,0.0006095447],"about_ca_topic_score_codex":0.28755304,"about_ca_topic_score_gemma":0.82727945,"teacher_disagreement_score":0.64312524,"about_ca_system_score_codex":0.000636841,"about_ca_system_score_gemma":0.00040259588,"threshold_uncertainty_score":0.9999669},"labels":[],"label_agreement":null},{"id":"W2922438643","doi":"10.1139/cjce-2018-0149","title":"Optimized material management in construction using multi-layer perceptron","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Unavailability; Genetic algorithm; Computer science; Schedule; Perceptron; Component (thermodynamics); Multilayer perceptron; Mathematical optimization; Total cost; Artificial neural network; Reliability engineering; Engineering; Machine learning","score_opus":0.009365840395599269,"score_gpt":0.18982156391672678,"score_spread":0.18045572352112751,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922438643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9226946,0.00020794845,0.069222435,0.000013269078,0.005207133,0.0001450588,0.000006487595,0.00003654158,0.0024664851],"genre_scores_gemma":[0.98199856,0.00001898105,0.017807325,0.0000055952073,0.00011110801,0.0000016039039,0.0000012506403,0.000024417526,0.00003112773],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932706,0.00000842319,0.00030364632,0.00006758027,0.00008029068,0.00021298016],"domain_scores_gemma":[0.9996876,0.000005178373,0.000040592513,0.00007880031,0.00003889174,0.00014890595],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009853831,0.00011602805,0.00016925366,0.0005294947,0.00001781441,0.000051202544,0.00008321686,0.000071954026,0.00091464946],"category_scores_gemma":[0.000004692459,0.00012710695,0.00005327669,0.00014945805,0.000012495775,0.00023513623,0.0000034176312,0.00017982381,0.0000112167845],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006737316,0.0000017749891,0.00088397955,0.000052997486,0.000043610384,0.000029191897,0.00013937883,0.98790544,0.008348697,0.0004508424,0.000045583387,0.0020917628],"study_design_scores_gemma":[0.002439601,0.000036948808,0.010914193,0.00045414583,0.000053400356,0.0007835002,0.00083455245,0.97674036,0.0022425232,0.000043577424,0.0049690027,0.0004882243],"about_ca_topic_score_codex":0.00018417001,"about_ca_topic_score_gemma":0.0038097166,"teacher_disagreement_score":0.059303954,"about_ca_system_score_codex":0.00034352113,"about_ca_system_score_gemma":0.00006418912,"threshold_uncertainty_score":0.9999986},"labels":[],"label_agreement":null},{"id":"W2923839026","doi":"10.1139/cjce-2018-0408","title":"Lean construction and BIM in small and medium-sized enterprises (SMEs) in construction: a systematic literature review","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Lean construction; Business; Construction industry; Building information modeling; Small and medium-sized enterprises; Systematic review; Process management; Knowledge management; Operations management; Construction engineering; Computer science; Engineering","score_opus":0.0037709008377199258,"score_gpt":0.1653101364662113,"score_spread":0.16153923562849137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2923839026","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71412414,0.27636346,0.0037532498,0.00035134563,0.0034671957,0.000759522,0.00001447671,0.000056878565,0.0011097634],"genre_scores_gemma":[0.9887915,0.010251451,0.00082654157,0.00003230126,0.000063453896,0.000007308019,0.0000015274808,0.00001760056,0.000008296254],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9991481,0.000021506365,0.000503714,0.00009145838,0.00006761687,0.000167611],"domain_scores_gemma":[0.99954146,0.000045759887,0.00008094179,0.00008352706,0.000063046115,0.00018525349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024173669,0.00014446251,0.00039250636,0.00062795385,0.0000145236245,0.000062190884,0.00006212189,0.00009311481,0.000044867676],"category_scores_gemma":[0.000084371466,0.00013916197,0.00003853366,0.00032721425,0.00003320456,0.00024311007,0.0000038914304,0.0003506353,0.0000011054226],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008351122,0.000028033184,0.37692234,0.4814626,0.00076828577,0.0013724669,0.007710269,0.05668202,0.007765335,0.035239127,0.00086554734,0.03110048],"study_design_scores_gemma":[0.007486068,0.00030177814,0.040439703,0.8431453,0.00036992028,0.048266314,0.0038419347,0.04554673,0.00089077424,0.0020348427,0.005477923,0.002198705],"about_ca_topic_score_codex":0.000053932912,"about_ca_topic_score_gemma":0.018166956,"teacher_disagreement_score":0.3616827,"about_ca_system_score_codex":0.00012772177,"about_ca_system_score_gemma":0.00011537695,"threshold_uncertainty_score":0.99974895},"labels":[],"label_agreement":null},{"id":"W2926743677","doi":"10.11159/icgre19.134","title":"Integrating BIM Models with 3D Scenery from UAV-Assisted Survey on Embankment","year":2019,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Levee; Computer science; Construction engineering; Systems engineering; Engineering; Geotechnical engineering","score_opus":0.006582562205163554,"score_gpt":0.1700372901665629,"score_spread":0.16345472796139934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2926743677","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99720013,0.00011579261,0.00007553121,0.000020827441,0.0007899169,0.00023819123,0.00008039136,0.00010475545,0.0013744537],"genre_scores_gemma":[0.9986333,0.000039640872,0.0009057397,0.000027820692,0.000041892756,0.000017311393,0.00002347911,0.00004796556,0.00026281003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989197,0.000005331241,0.00026475047,0.0002902473,0.00029182518,0.00022813384],"domain_scores_gemma":[0.99961555,0.00005992729,0.00009599267,0.00014534437,0.000014231923,0.00006897174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000066480505,0.0003195576,0.00027138082,0.00012748556,0.00007756583,0.00007508344,0.00019753806,0.000068634065,0.00006769504],"category_scores_gemma":[0.000006084316,0.0002229223,0.00005588817,0.00015986824,0.00006809571,0.00026297156,0.000052439074,0.00031521605,0.000003307255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005279641,0.00006629713,0.0907405,0.00043151455,0.00067838107,0.0000018778502,0.00059334916,0.6255414,0.23871973,0.017814659,0.0005898491,0.024294486],"study_design_scores_gemma":[0.0012857883,0.00023731685,0.2294111,0.0011648354,0.00006943519,0.000018370602,0.00043811338,0.698826,0.06698355,0.00049339293,0.0002267817,0.0008452752],"about_ca_topic_score_codex":0.000057115096,"about_ca_topic_score_gemma":0.00007375929,"teacher_disagreement_score":0.17173618,"about_ca_system_score_codex":0.00012145338,"about_ca_system_score_gemma":0.000003835104,"threshold_uncertainty_score":0.90905076},"labels":[],"label_agreement":null},{"id":"W2929470925","doi":"10.1108/ci-11-2018-0094","title":"BIM-based draft schedule generation in reinforced concrete-framed buildings","year":2019,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Schedule; Scope (computer science); Building information modeling; Computer science; Scheduling (production processes); Statement of work; Work breakdown structure; Architecture; Project management; Work (physics); Integrated project delivery; Originality; Construction management; Construction engineering; Software; Systems engineering; Software engineering; Project planning; Engineering; Civil engineering; Operations management","score_opus":0.009586889634625805,"score_gpt":0.20947308872613907,"score_spread":0.19988619909151326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929470925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9018099,0.000020558897,0.0918343,0.00014655596,0.0020623624,0.00033379748,0.000005037584,0.00034701632,0.0034404765],"genre_scores_gemma":[0.98651105,0.000005585769,0.012706792,0.00018690179,0.00018575329,0.000059204838,0.0002220522,0.000026987062,0.00009568769],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987424,0.000025854131,0.0005923824,0.00023668136,0.00020424945,0.00019841596],"domain_scores_gemma":[0.9993044,0.000021935539,0.00012648299,0.00022247937,0.0002967432,0.000027938451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002000412,0.00018120764,0.00017896543,0.0007704953,0.00006168972,0.000087752436,0.00007891594,0.0002332944,0.0004762904],"category_scores_gemma":[0.000051894458,0.00020718129,0.000036668243,0.001674863,0.00007178245,0.0005665526,0.000007813622,0.0002784304,0.0001221755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023794528,0.0000022345357,0.006507325,0.00005596586,0.00001722961,5.3891523e-7,0.00006123031,0.044050194,0.46518138,0.45906523,0.00037961037,0.024655282],"study_design_scores_gemma":[0.0015814055,0.000057759436,0.00086764444,0.00005971799,0.000008651923,0.000025333402,0.00020946974,0.724955,0.2650055,0.0008535261,0.005988545,0.0003874072],"about_ca_topic_score_codex":0.00001262765,"about_ca_topic_score_gemma":0.000005759946,"teacher_disagreement_score":0.68090487,"about_ca_system_score_codex":0.00021103816,"about_ca_system_score_gemma":0.00007752077,"threshold_uncertainty_score":0.8448608},"labels":[],"label_agreement":null},{"id":"W2930776121","doi":"10.11159/icsect19.134","title":"3D Model Generation of CFS Members from Surface Data","year":2019,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Computer science; Data modeling; Database","score_opus":0.011388869745481906,"score_gpt":0.1870707467830088,"score_spread":0.1756818770375269,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2930776121","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9978748,0.00023316966,0.00009625002,0.000020127618,0.0007293355,0.00014925908,0.00014648672,0.00004577875,0.0007048058],"genre_scores_gemma":[0.99763596,0.00009135142,0.0019198663,0.000009231694,0.00004072731,0.0000027046422,0.000035813457,0.000025341538,0.00023897892],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922854,0.0000016691685,0.00023371397,0.00021278634,0.00019544747,0.0001278375],"domain_scores_gemma":[0.99966043,0.000017912298,0.00008020559,0.00019500386,0.000008454511,0.00003798737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000044102006,0.00017651377,0.00018692926,0.000053482137,0.000034893248,0.000026408848,0.0002675502,0.00005339596,0.0000809252],"category_scores_gemma":[0.000004747678,0.00014483648,0.000035998833,0.00008001108,0.000053689248,0.0003380863,0.00010383405,0.00015062504,0.0000013594394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000955229,0.0000036591225,0.003592002,0.000078694844,0.000057260586,3.9402956e-8,0.00007372645,0.48633364,0.50735223,0.0011813309,0.0002449168,0.0010729244],"study_design_scores_gemma":[0.00021181614,0.000009557064,0.0024012045,0.000075211676,0.00002604137,0.0000021207452,0.00006584622,0.90290475,0.09387637,0.00007837745,0.00020247472,0.00014623636],"about_ca_topic_score_codex":0.000015026198,"about_ca_topic_score_gemma":0.000016333515,"teacher_disagreement_score":0.4165711,"about_ca_system_score_codex":0.000041175153,"about_ca_system_score_gemma":0.0000027702135,"threshold_uncertainty_score":0.59062606},"labels":[],"label_agreement":null},{"id":"W29325392","doi":"10.7874/jao.2017.00192","title":"Software agents in bridge management","year":2005,"lang":"en","type":"article","venue":"Journal of Audiology & Otology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Acadia University","funders":"","keywords":"Bridge (graph theory); Software; Computer science; Business; Risk analysis (engineering); Programming language","score_opus":0.01429297126567346,"score_gpt":0.24891744199511737,"score_spread":0.2346244707294439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W29325392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9804538,0.00059378264,0.014091762,0.00058021327,0.0012310669,0.000057740028,0.0000010751198,0.000032445,0.002958137],"genre_scores_gemma":[0.99475026,0.00029863373,0.004438398,0.00022729888,0.00018218817,0.0000037041052,0.0000010013702,0.0000072307607,0.00009129489],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9993733,0.00003669577,0.00034425512,0.00005826911,0.000045064065,0.00014242787],"domain_scores_gemma":[0.9997677,0.000023390658,0.000079525154,0.000066046654,0.0000326759,0.000030625553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011761793,0.00007100582,0.00018849161,0.00022199344,0.000013918294,0.0000033597446,0.000102210164,0.00010976696,0.000183432],"category_scores_gemma":[0.000013127425,0.00006420763,0.000051618845,0.00007708066,0.000041881845,0.00007995279,0.000011114336,0.00022261863,0.00004988193],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013947819,0.00010153212,0.34762582,0.00006767959,0.0004797019,0.0005042989,0.00050546793,0.039640483,0.0012162143,0.0082179895,0.08134311,0.52015823],"study_design_scores_gemma":[0.0013249184,0.00014449174,0.9130406,0.000035944213,0.000038251594,0.0035995173,0.00007318676,0.0010486491,0.0005261595,0.002066167,0.07794443,0.00015771783],"about_ca_topic_score_codex":0.0000011567619,"about_ca_topic_score_gemma":0.00003265396,"teacher_disagreement_score":0.5654147,"about_ca_system_score_codex":0.00007393772,"about_ca_system_score_gemma":0.000009176921,"threshold_uncertainty_score":0.2618311},"labels":[],"label_agreement":null},{"id":"W2936215202","doi":"10.29173/mocs9","title":"Key Factors Affecting Construction Organizations' Acceptance of BIM: A Comparative Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Process (computing); Business; Structural equation modeling; Process management; Knowledge management; Construction industry; Key (lock); Questionnaire; Technology acceptance model; Usability; Engineering; Operations management; Construction engineering; Computer science","score_opus":0.010323544486848208,"score_gpt":0.21288204685320283,"score_spread":0.20255850236635461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936215202","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97570544,0.00014686614,0.021346636,0.00002841056,0.00083179894,0.0004830343,0.000026864682,0.00038391072,0.0010470279],"genre_scores_gemma":[0.9961885,0.00008286242,0.0034810735,0.0000050678514,0.00012247385,0.000019697762,0.000007483565,0.000035236426,0.000057577814],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99847436,0.000025269044,0.00054392486,0.00041753714,0.00027745933,0.00026146666],"domain_scores_gemma":[0.99883604,0.0000532567,0.000223031,0.00014171108,0.0006314317,0.000114504226],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014321829,0.00033170104,0.00043017388,0.00035843175,0.0002604333,0.00010357598,0.000121538906,0.00016564112,0.00015679108],"category_scores_gemma":[0.00006824532,0.00026865312,0.00006916058,0.0008492411,0.00036092542,0.0009243633,0.00003855745,0.00018650651,0.000009895552],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005441185,0.000078379795,0.8430866,0.00014738228,0.00029240965,0.0000010372429,0.004928845,0.00010637263,0.08080126,0.015057087,0.00019490882,0.05525128],"study_design_scores_gemma":[0.0065207956,0.00083992234,0.3060702,0.0007531426,0.0005950212,0.0003820607,0.15051629,0.006525614,0.5186966,0.003473678,0.0032618672,0.0023647994],"about_ca_topic_score_codex":0.00001961336,"about_ca_topic_score_gemma":0.00003252366,"teacher_disagreement_score":0.53701645,"about_ca_system_score_codex":0.00010524793,"about_ca_system_score_gemma":0.000029655757,"threshold_uncertainty_score":0.9999766},"labels":[],"label_agreement":null},{"id":"W2936307821","doi":"10.29173/mocs42","title":"Training for Manufactured Construction (TRAMCON) – Benefits and Challenges for Workforce Development at Manufactured Housing Industry","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workforce; SAFER; Factory (object-oriented programming); Work (physics); Productivity; Training (meteorology); Curriculum; Quality (philosophy); Workforce development; Process (computing); Engineering; Engineering management; Business; Operations management; Economic growth; Computer science; Mechanical engineering","score_opus":0.04463706442607094,"score_gpt":0.22799795541332174,"score_spread":0.1833608909872508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936307821","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9759112,0.0023710523,0.017870713,0.00029542518,0.0013874171,0.00086204347,0.000043085965,0.00043013107,0.0008289565],"genre_scores_gemma":[0.94178486,0.000691046,0.05633195,0.000065995395,0.000678361,0.00018909079,0.00005159539,0.00007421437,0.0001328897],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982925,0.0000069585553,0.0004702501,0.0005782022,0.00018638284,0.0004657032],"domain_scores_gemma":[0.999223,0.000038661834,0.00016010342,0.00010435868,0.00028689308,0.0001869948],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020172354,0.00041667023,0.00038396314,0.00026248232,0.0007144852,0.0001987451,0.00008761515,0.0006142981,0.000025421627],"category_scores_gemma":[0.000028789183,0.00043325592,0.00008306788,0.00012580083,0.00037391108,0.00051363383,0.000035219073,0.0002780978,0.0000022167549],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014734347,0.0000068275067,0.001904862,0.00033506512,0.00012718033,2.592556e-7,0.0013633732,0.0000846134,0.0025386116,0.007966093,0.00013961902,0.98538613],"study_design_scores_gemma":[0.007093496,0.00055953354,0.018689858,0.0011167624,0.0004966196,0.0010279149,0.01821353,0.022558391,0.40331405,0.0069176843,0.5170404,0.0029717928],"about_ca_topic_score_codex":0.0000022444403,"about_ca_topic_score_gemma":0.000044009827,"teacher_disagreement_score":0.98241436,"about_ca_system_score_codex":0.00014638118,"about_ca_system_score_gemma":0.000034350956,"threshold_uncertainty_score":0.99981195},"labels":[],"label_agreement":null},{"id":"W2936431890","doi":"10.29173/mocs66","title":"Application of machine learning approach for logistics cost estimation in panelized construction","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cost estimate; Computer science; Integrated logistics support; Overhead (engineering); Learning effect; Cost driver; Operations research; Operations management; Industrial engineering; Business; Engineering; Systems engineering; Marketing; Economics","score_opus":0.013702169269918383,"score_gpt":0.2271460182649391,"score_spread":0.21344384899502072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936431890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19723132,0.00019372374,0.79965997,0.00003969057,0.00034405847,0.00077121827,0.000034947345,0.00017819308,0.0015468877],"genre_scores_gemma":[0.92747396,0.00017208952,0.071931876,0.0000052192977,0.00007751994,0.00016733728,0.00011252422,0.000028003653,0.000031444106],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879634,0.0000098727305,0.000482636,0.000331427,0.00016553338,0.00021419422],"domain_scores_gemma":[0.9991537,0.00002233456,0.00032449915,0.00015950818,0.0002719166,0.000068076886],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024539887,0.00022714506,0.00032814522,0.00025553798,0.00035225565,0.00016345408,0.00013519527,0.00022560223,0.000007642077],"category_scores_gemma":[0.00012286716,0.00024558557,0.0000698613,0.0001457409,0.00035793876,0.00056831806,0.000028026609,0.00025573614,0.0000014310585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021251633,0.000043211785,0.14580157,0.00081734813,0.00008313961,3.635996e-7,0.00030326738,0.026750704,0.016513031,0.05953034,0.000045483266,0.749899],"study_design_scores_gemma":[0.0013549364,0.00005316788,0.0052847303,0.000053720396,0.00006057354,0.000051192117,0.00056357885,0.9812116,0.0071256733,0.0024065531,0.0015650395,0.0002692343],"about_ca_topic_score_codex":0.000061479346,"about_ca_topic_score_gemma":0.000020769363,"teacher_disagreement_score":0.9544609,"about_ca_system_score_codex":0.00008084027,"about_ca_system_score_gemma":0.000016770839,"threshold_uncertainty_score":0.99999964},"labels":[],"label_agreement":null},{"id":"W2936647771","doi":"10.29173/mocs64","title":"Construction industrialization and it integration: how tall wood buildings can show the right path towards construction 4.0","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Supply chain; Architectural engineering; Construction industry; Industrialisation; Path (computing); Order (exchange); Construction engineering; Computer science; Engineering; Business; Operations management; Marketing; Economics","score_opus":0.012123822031777934,"score_gpt":0.2026194617216751,"score_spread":0.1904956396898972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936647771","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94891983,0.00050076976,0.03175448,0.0067737903,0.0042574,0.0010160167,0.000097124575,0.00064026436,0.006040331],"genre_scores_gemma":[0.9903735,0.0008856617,0.0073020062,0.000107385196,0.00085074926,0.00009051372,0.00006017525,0.000060860355,0.0002691507],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99779457,0.000037341233,0.0005747372,0.0006922667,0.00045970312,0.00044139655],"domain_scores_gemma":[0.99833304,0.000027243941,0.0004721997,0.0003689951,0.000574615,0.00022391266],"candidate_categories":["metaepi_narrow","sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00038702704,0.00055790774,0.00047856665,0.00032404822,0.0017936656,0.0020227064,0.00030079513,0.0005511001,0.00009149445],"category_scores_gemma":[0.0001739493,0.0004741915,0.00012767909,0.00032018812,0.0014364125,0.0019015571,0.00010349408,0.00068690884,0.000003974306],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010570488,0.000024493638,0.028609239,0.00021658873,0.0002962966,0.0000054751667,0.0012347809,0.000073570656,0.014439079,0.16185288,0.0050030644,0.7881388],"study_design_scores_gemma":[0.015998004,0.0010364897,0.06404586,0.0025928237,0.0025222106,0.010467829,0.060215298,0.16128276,0.20702915,0.05211508,0.41484115,0.007853361],"about_ca_topic_score_codex":0.00011013397,"about_ca_topic_score_gemma":0.00013916922,"teacher_disagreement_score":0.7802855,"about_ca_system_score_codex":0.00017757554,"about_ca_system_score_gemma":0.00007580163,"threshold_uncertainty_score":0.999771},"labels":[],"label_agreement":null},{"id":"W2936876376","doi":"10.29173/mocs8","title":"Integration of BIM and Computer Simulations in Modular Construction, A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chongqing Graduate Student Research Innovation Project","keywords":"Building information modeling; Modular design; Bridge (graph theory); Modular construction; Computer science; Discrete event simulation; Modularity (biology); Systems engineering; Productivity; Construction industry; Event (particle physics); Construction engineering; Software engineering; Engineering; Simulation; Operations management","score_opus":0.009325367435732571,"score_gpt":0.2080347975870605,"score_spread":0.19870943015132794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936876376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95003474,0.0001432116,0.0485904,0.00005341652,0.00043731075,0.00044617426,0.000025081785,0.00015551815,0.000114165894],"genre_scores_gemma":[0.9916216,0.00008899918,0.008087179,0.000010213448,0.000113631235,0.000028556731,0.0000050697704,0.000026197456,0.000018538401],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858433,0.000024066087,0.00059395074,0.0003978959,0.00018819071,0.00021156021],"domain_scores_gemma":[0.99929166,0.000041300438,0.00012751647,0.00012914417,0.00030944345,0.00010093344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016638033,0.00027038992,0.00033710297,0.0005430763,0.00014557927,0.0000893949,0.00006034277,0.00017053334,0.000038215578],"category_scores_gemma":[0.000026993977,0.00022804405,0.000050130348,0.00044696985,0.0003266035,0.0007872655,0.000035459907,0.0001762253,0.0000019523152],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061419894,0.00010210896,0.40604436,0.0001627443,0.0001541607,0.00004022143,0.0018962097,0.00077929115,0.047829147,0.025529334,0.000056698726,0.5173443],"study_design_scores_gemma":[0.015499404,0.0013528779,0.1608421,0.001359667,0.0006050829,0.014000944,0.04854934,0.69164896,0.042786393,0.017363247,0.002952301,0.0030396858],"about_ca_topic_score_codex":0.00010233926,"about_ca_topic_score_gemma":0.00022282348,"teacher_disagreement_score":0.6908697,"about_ca_system_score_codex":0.00007394979,"about_ca_system_score_gemma":0.000018209286,"threshold_uncertainty_score":0.92993665},"labels":[],"label_agreement":null},{"id":"W2937094644","doi":"10.29173/mocs40","title":"Mass Customisable Roofing Solutions for the New Build and Retrofit Markets in the UK","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Scottish Funding Council","keywords":"Roof; Truss; Scope (computer science); Architectural engineering; Architecture; Engineering; Factory (object-oriented programming); Multitude; Structural system; Civil engineering; Construction engineering; Computer science","score_opus":0.010084268500890062,"score_gpt":0.20075558669882732,"score_spread":0.19067131819793726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937094644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.838614,0.0035722696,0.14026812,0.004702104,0.0021208995,0.0016059878,0.000033216624,0.00036689092,0.008716537],"genre_scores_gemma":[0.99420285,0.00027647513,0.0044620386,0.00016250351,0.000526353,0.000076417906,0.0000046689797,0.000021848577,0.00026686318],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900365,0.000010035839,0.0002584969,0.000257851,0.00014817539,0.000321819],"domain_scores_gemma":[0.99956065,0.000061804145,0.000057842983,0.00011790591,0.00013605191,0.000065747285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039616198,0.00018728268,0.00015708873,0.00013162637,0.0006056833,0.00025723956,0.0001312433,0.00014003614,0.0000439274],"category_scores_gemma":[0.00004994334,0.00013570914,0.000054250246,0.00030902537,0.0002866755,0.00033349922,0.00002698276,0.0002283291,0.0000037223838],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032326736,0.00002593831,0.11194785,0.0003778186,0.00030773893,0.0000019316394,0.0033530893,0.0003450201,0.029586392,0.22521985,0.077867895,0.5506432],"study_design_scores_gemma":[0.004939214,0.00032298168,0.05564059,0.0004374723,0.0004978437,0.00070589915,0.01778245,0.43341488,0.012846749,0.05063476,0.42117944,0.001597713],"about_ca_topic_score_codex":0.000047197173,"about_ca_topic_score_gemma":0.000104384286,"teacher_disagreement_score":0.5490455,"about_ca_system_score_codex":0.000049004433,"about_ca_system_score_gemma":0.000018550356,"threshold_uncertainty_score":0.55340576},"labels":[],"label_agreement":null},{"id":"W2937133234","doi":"10.29173/mocs48","title":"A New Graduate Course on Modular Construction: University of Nevada, Las Vegas","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Construction Industry Institute, University of Texas at Austin; University of Texas at Austin; University of Nevada, Las Vegas","keywords":"Modular programming; Las vegas; Modular design; Standardization; Engineering management; Engineering; Course (navigation); Computer science; Political science","score_opus":0.010951262123474227,"score_gpt":0.18782798710914742,"score_spread":0.1768767249856732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937133234","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96543837,0.0002499467,0.021507414,0.0002630433,0.0016855926,0.00028726144,0.000030507397,0.0004389844,0.010098899],"genre_scores_gemma":[0.9847316,0.00023381117,0.013895841,0.00003543008,0.0004989388,0.0000022263382,0.000012707485,0.000036246623,0.0005531819],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99859196,0.000013846862,0.00032954186,0.00043061585,0.0003329365,0.00030111655],"domain_scores_gemma":[0.9989855,0.0000141736955,0.00014874226,0.00018294588,0.00045146554,0.00021716475],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012490383,0.00031410097,0.00034708902,0.0002548997,0.0003012747,0.00008440902,0.00015180124,0.00023802882,0.00026676364],"category_scores_gemma":[0.000015155927,0.000353038,0.00011945632,0.00047099628,0.00065066543,0.0005402457,0.000035918987,0.00031183846,0.000049872735],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006720878,0.00009444443,0.03756285,0.00041265672,0.0006945555,0.00001633178,0.0018616588,0.0006303177,0.029898832,0.18717167,0.018869445,0.72211516],"study_design_scores_gemma":[0.015573346,0.0034739661,0.08195665,0.0018753046,0.0018607562,0.0025837894,0.033167157,0.15469112,0.25490528,0.040008187,0.40433204,0.0055723833],"about_ca_topic_score_codex":0.00009828904,"about_ca_topic_score_gemma":0.000056486348,"teacher_disagreement_score":0.7165428,"about_ca_system_score_codex":0.000081932594,"about_ca_system_score_gemma":0.000066895765,"threshold_uncertainty_score":0.9998922},"labels":[],"label_agreement":null},{"id":"W2937193245","doi":"10.29173/mocs23","title":"Offsite Construction in the UK Housing Sector: Barriers and Challenges","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Salford Manchester","keywords":"Affordable housing; Business; Quality (philosophy); Production (economics); Manufacturing sector; Risk analysis (engineering); Engineering; Civil engineering; Economics","score_opus":0.011805641364467725,"score_gpt":0.18072909331786943,"score_spread":0.1689234519534017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937193245","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9902481,0.003025219,0.002173163,0.0008101513,0.0007887491,0.00029565537,0.000016558579,0.00025437798,0.002388061],"genre_scores_gemma":[0.99288565,0.0048301127,0.0018731166,0.00006215278,0.00024791554,0.000038995717,0.000003250473,0.00003232604,0.000026498807],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9985646,0.000027855158,0.0003820378,0.0004371724,0.00025080497,0.0003375447],"domain_scores_gemma":[0.9994547,0.00004369138,0.000096317206,0.00014093262,0.00012861166,0.00013578459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030061745,0.00031188538,0.00027929308,0.0003229029,0.00026092603,0.00018266668,0.000115337156,0.00023668872,0.00007573151],"category_scores_gemma":[0.00004193993,0.00022554815,0.0000635176,0.00028502278,0.00048341346,0.0006721306,0.00003076996,0.00025866737,0.0000061996707],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000072733135,0.000010784902,0.15852144,0.00029788606,0.00010410132,0.000005835484,0.0019473939,0.000025921101,0.018771296,0.060953103,0.00036058386,0.7589289],"study_design_scores_gemma":[0.018829176,0.0010176008,0.33446196,0.0037276351,0.00097604207,0.008095931,0.14095056,0.0239595,0.070339255,0.05544224,0.3343992,0.007800931],"about_ca_topic_score_codex":0.000022220762,"about_ca_topic_score_gemma":0.00010029276,"teacher_disagreement_score":0.751128,"about_ca_system_score_codex":0.00008998858,"about_ca_system_score_gemma":0.00002224531,"threshold_uncertainty_score":0.9197587},"labels":[],"label_agreement":null},{"id":"W2937277232","doi":"10.29173/mocs53","title":"Research and discussion over seismic performance of modular structure","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Key Research and Development Program of China; National Science Foundation","keywords":"Modular design; Modular construction; Connection (principal bundle); Frame (networking); Structural engineering; Steel frame; Computer science; Engineering; Mechanical engineering; Programming language","score_opus":0.012744022963956596,"score_gpt":0.24042617362512883,"score_spread":0.22768215066117223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937277232","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99710363,0.00033437542,0.00045760314,0.00012545154,0.00047358923,0.00020333643,0.000023297798,0.00009113638,0.0011875874],"genre_scores_gemma":[0.9978858,0.0004927925,0.0011359758,0.000008229289,0.00016777437,0.000011400056,0.000008219303,0.000028406168,0.00026137446],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9987225,0.000009191709,0.00029840795,0.00035086513,0.00033384524,0.00028517257],"domain_scores_gemma":[0.99921954,0.00000904261,0.00011901267,0.00023237939,0.00030015467,0.000119872384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020757041,0.00022028806,0.00026205354,0.00026858263,0.00068094156,0.00027384167,0.00017428628,0.00022939098,0.00005123402],"category_scores_gemma":[0.000024796807,0.00017284817,0.000042795913,0.00014962124,0.0006802548,0.000995471,0.000096664575,0.0004141216,0.0000024169433],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016408529,0.00002719994,0.41406196,0.0011364061,0.00014574213,0.0000026595196,0.0007907534,0.00051556475,0.17301512,0.015600905,0.0007592,0.3937804],"study_design_scores_gemma":[0.002577705,0.00042895981,0.40780884,0.0007938197,0.00011740459,0.0003297104,0.0028942577,0.3979475,0.15660866,0.01087241,0.018500539,0.0011202006],"about_ca_topic_score_codex":0.00003079627,"about_ca_topic_score_gemma":0.000011480689,"teacher_disagreement_score":0.3974319,"about_ca_system_score_codex":0.000045298726,"about_ca_system_score_gemma":0.000017176175,"threshold_uncertainty_score":0.70485437},"labels":[],"label_agreement":null},{"id":"W2937473149","doi":"10.29173/mocs17","title":"Measuring and Tracking Externalized Work to Support Industrialized Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Tacit knowledge; Work (physics); Explicit knowledge; Predictability; Computer science; Control (management); Industrialisation; Risk analysis (engineering); Externalization; Knowledge management; Industrial engineering; Operations research; Engineering; Business; Artificial intelligence; Economics; Civil engineering","score_opus":0.024475541612357102,"score_gpt":0.20583987920049232,"score_spread":0.18136433758813522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937473149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9730903,0.00024414257,0.0225693,0.0002712911,0.001429482,0.00039835024,0.000015634356,0.00051381945,0.0014676786],"genre_scores_gemma":[0.9908943,0.00026672456,0.008032644,0.000053760952,0.00039633887,0.00005740103,0.0000043166565,0.00005091959,0.0002435791],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99822974,0.000018625515,0.00053887605,0.000515621,0.0003075351,0.00038958323],"domain_scores_gemma":[0.9991745,0.000030022118,0.00012292928,0.0001297677,0.00025648644,0.00028634572],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027979654,0.00035666177,0.00039051333,0.00040367382,0.00024888758,0.00030330627,0.000105944644,0.00028979452,0.00016825502],"category_scores_gemma":[0.00007885254,0.0003075667,0.0000826783,0.00044239245,0.0002589883,0.0008858108,0.00004828257,0.00024211514,0.00002315296],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015923071,0.000007620812,0.08708176,0.00007052228,0.00009302198,0.000002818693,0.00027061926,0.0000139861595,0.05487484,0.0062225726,0.0004790993,0.8507239],"study_design_scores_gemma":[0.028361382,0.0010409564,0.118314266,0.0045958227,0.0011197438,0.0047062854,0.007987731,0.0032304118,0.4737205,0.017955089,0.33176035,0.007207468],"about_ca_topic_score_codex":0.000011999152,"about_ca_topic_score_gemma":0.0000078747125,"teacher_disagreement_score":0.84351647,"about_ca_system_score_codex":0.00012108962,"about_ca_system_score_gemma":0.000025675548,"threshold_uncertainty_score":0.99993765},"labels":[],"label_agreement":null},{"id":"W2937517686","doi":"10.29173/mocs39","title":"Predictive Model for Siding Practice in Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Engineering; Bottleneck; Schedule; Industrial engineering; Duration (music); Workstation; Identification (biology); Lead time; Predictability; Operations research; Factory (object-oriented programming); Simulation; Reliability engineering; Operations management; Computer science; Mechanical engineering","score_opus":0.009971022277287269,"score_gpt":0.2220752535867429,"score_spread":0.21210423130945563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937517686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67584956,0.0004913715,0.31198207,0.0002485795,0.0017244999,0.0009733397,0.000056149558,0.00067922316,0.00799522],"genre_scores_gemma":[0.94544053,0.00030026102,0.053413678,0.00007865266,0.00044371493,0.00015025996,0.000020009275,0.000049224927,0.00010364009],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983801,0.000014263988,0.0005097537,0.00048831943,0.00022713469,0.0003804279],"domain_scores_gemma":[0.99892277,0.000058639813,0.00015085026,0.0001147274,0.00062832027,0.00012467218],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028785766,0.0003125968,0.00032354172,0.00038793246,0.0002835442,0.0001781631,0.00010020001,0.00028976693,0.000026712196],"category_scores_gemma":[0.00016706913,0.00033961935,0.00008496358,0.00042134494,0.00040845873,0.001393116,0.00002927711,0.0002930018,0.000008051055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019332812,0.00014284857,0.02733148,0.0008749825,0.0006049228,0.000005865061,0.009799317,0.008196915,0.08675223,0.18750328,0.0033714995,0.6734834],"study_design_scores_gemma":[0.001912392,0.00015670426,0.0005103863,0.00014327245,0.0001277271,0.00026320122,0.0058831354,0.96035796,0.012779369,0.00808232,0.0092617655,0.0005217729],"about_ca_topic_score_codex":0.000016512611,"about_ca_topic_score_gemma":0.00002633825,"teacher_disagreement_score":0.952161,"about_ca_system_score_codex":0.00015183906,"about_ca_system_score_gemma":0.00004433712,"threshold_uncertainty_score":0.9999056},"labels":[],"label_agreement":null},{"id":"W2937669126","doi":"10.29173/mocs11","title":"3d/4d Visualization Framework for Modelling Off-Site Productivity of Modular Construction Housing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Productivity; Computer science; Process (computing); Modular construction; Systems engineering; Construction engineering; Software; Building information modeling; Engineering; Software engineering; Engineering management; Operations management; Scheduling (production processes)","score_opus":0.011258894891506678,"score_gpt":0.2132279828235479,"score_spread":0.20196908793204124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937669126","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47208735,0.0003632928,0.52602464,0.000050143597,0.0007106362,0.00036014183,0.000033490214,0.00026069768,0.000109607536],"genre_scores_gemma":[0.89214176,0.0004047309,0.106805,0.000014157522,0.00043450805,0.000068694484,0.000020811534,0.0000736996,0.000036668087],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979575,0.000020239668,0.00067471864,0.0006227226,0.00033087743,0.0003938958],"domain_scores_gemma":[0.9986117,0.0000553137,0.0002997693,0.0002075169,0.0006944189,0.00013127111],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003046542,0.00039589248,0.00047018178,0.00042331967,0.00034842957,0.00015591638,0.0001097031,0.00038706764,0.000033593366],"category_scores_gemma":[0.0000954684,0.00036027157,0.00014768036,0.0004903355,0.0004927188,0.0011930735,0.000034341865,0.00020378172,0.0000035951384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021463574,0.000051434057,0.040705584,0.00078623137,0.00022409153,6.798723e-7,0.0005341379,0.009077047,0.11424164,0.29736054,0.00007533223,0.5367286],"study_design_scores_gemma":[0.0024136615,0.00025042504,0.001406713,0.0012332473,0.00038431113,0.00019151074,0.0010615416,0.6774718,0.23770562,0.066638365,0.009768431,0.0014743677],"about_ca_topic_score_codex":0.000012196132,"about_ca_topic_score_gemma":0.0000069924786,"teacher_disagreement_score":0.66839474,"about_ca_system_score_codex":0.00013372062,"about_ca_system_score_gemma":0.00004251855,"threshold_uncertainty_score":0.9998849},"labels":[],"label_agreement":null},{"id":"W2937847675","doi":"10.1061/(asce)me.1943-5479.0000698","title":"Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Risk analysis (engineering); Schedule; Modular programming; Modular design; Identification (biology); Risk management; Process (computing); Computer science; Engineering; Systems engineering; Reliability engineering; Business","score_opus":0.006958685917370178,"score_gpt":0.2139265249411759,"score_spread":0.20696783902380572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937847675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4265008,0.000080770165,0.5714212,0.000009364308,0.0010761254,0.000449144,0.0000029252085,0.00004106221,0.00041858418],"genre_scores_gemma":[0.8085615,0.00021297068,0.19108015,0.000007902788,0.00005210547,0.00004088108,0.00000717415,0.000024488565,0.000012815896],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987432,0.000016550386,0.0006407904,0.00014778147,0.00023866002,0.00021302869],"domain_scores_gemma":[0.9995484,0.000060104296,0.00014172397,0.00014302212,0.00006828509,0.000038468104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003959714,0.00017634938,0.00023860298,0.0008707276,0.000015673593,0.000053301326,0.00013184658,0.00010591514,0.000036033918],"category_scores_gemma":[0.000018623898,0.00017771276,0.00008774709,0.0004977642,0.000008928767,0.00031164743,0.0000100396055,0.00033757414,0.000005141935],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006554726,0.000022796205,0.0030399286,0.0003095751,0.00005685883,0.000014110418,0.00004333567,0.86622727,0.00014832083,0.008579146,0.000035459645,0.12145765],"study_design_scores_gemma":[0.002332567,0.00013849467,0.013866166,0.0011587017,0.00004947125,0.00001531077,0.00077581796,0.9735484,0.0010408787,0.0050308844,0.0017730356,0.0002702645],"about_ca_topic_score_codex":0.0000026268497,"about_ca_topic_score_gemma":0.0000051744246,"teacher_disagreement_score":0.3820607,"about_ca_system_score_codex":0.0002813505,"about_ca_system_score_gemma":0.000013883918,"threshold_uncertainty_score":0.7246916},"labels":[],"label_agreement":null},{"id":"W2938505096","doi":"10.29173/mocs24","title":"Lessons from Sweden: How Australia Can Learn from Swedish Industrialised Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Sustainability; Productivity; Politics; Quality (philosophy); Business; Political science; Economic growth; Geography; Economics","score_opus":0.02638576273885344,"score_gpt":0.23159322289459283,"score_spread":0.2052074601557394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938505096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9864488,0.00020358386,0.007820417,0.0018444564,0.002185429,0.0002395306,0.000298996,0.000525613,0.0004331739],"genre_scores_gemma":[0.99501616,0.0001742914,0.0029302996,0.000036693487,0.0011057284,0.00003796608,0.000051020026,0.000053936164,0.00059389876],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99823904,0.000019337489,0.0003935728,0.00060663966,0.00032211802,0.00041931748],"domain_scores_gemma":[0.99916226,0.000046774636,0.00014813834,0.00018184251,0.0002100693,0.0002509403],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011969527,0.00040339408,0.00039967822,0.00023552697,0.00025255766,0.00042226238,0.000189296,0.00040564922,0.0003788395],"category_scores_gemma":[0.00006861863,0.00034829887,0.00012344378,0.00030557,0.00027219806,0.00084970734,0.00004930193,0.0003896532,0.000022929005],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107608925,0.000025830017,0.099381104,0.000057980444,0.0004493491,0.000010319683,0.0005342548,0.00006482689,0.46382314,0.015969392,0.010336854,0.40923932],"study_design_scores_gemma":[0.0125391185,0.00027129776,0.06653164,0.001835038,0.0010284656,0.00023565405,0.010376244,0.01085384,0.57852507,0.031086413,0.28201398,0.0047032363],"about_ca_topic_score_codex":0.00042615976,"about_ca_topic_score_gemma":0.00015499277,"teacher_disagreement_score":0.4045361,"about_ca_system_score_codex":0.0001673107,"about_ca_system_score_gemma":0.000031225194,"threshold_uncertainty_score":0.9998969},"labels":[],"label_agreement":null},{"id":"W2938571905","doi":"10.29173/mocs6","title":"Exploring the Benefits of Early Contractor Involvement (ECI) and the Mechanism for Automated 5D BIM Quantification Process in Offsite Modular Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Building information modeling; Process (computing); Process management; Activity-based costing; Deliverable; Key (lock); Construction management; Risk analysis (engineering); Government (linguistics); Modular design; Cost reduction; Construction engineering; Engineering; Project management; Systems engineering; Operations management; Business; Computer science; Computer security; Civil engineering","score_opus":0.03177847418956445,"score_gpt":0.2128911346050904,"score_spread":0.18111266041552596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938571905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98056245,0.00031818578,0.016546959,0.0004319802,0.00072996184,0.0010346723,0.00004435087,0.0002833758,0.000048048427],"genre_scores_gemma":[0.9970694,0.00074315706,0.0015407397,0.000023455228,0.00011976413,0.0004427987,0.00000910679,0.000035464946,0.000016072148],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99833494,0.000025978674,0.0006616168,0.00040687842,0.00027922736,0.00029134838],"domain_scores_gemma":[0.998874,0.00009252443,0.00025949607,0.00016636062,0.00053403096,0.00007359154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004649505,0.0002946865,0.00036835173,0.00027620714,0.00026294272,0.00014432738,0.00014580673,0.00014981834,0.000006313361],"category_scores_gemma":[0.00008424012,0.00018596962,0.00008488158,0.00037582897,0.0005025164,0.001016918,0.00002763381,0.00017379469,0.0000015277172],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005492356,0.000037065187,0.024740666,0.0005464153,0.00023121113,3.922339e-7,0.0024321417,0.0005666593,0.07541995,0.7033458,0.000031324074,0.19209917],"study_design_scores_gemma":[0.018694835,0.00048499368,0.13221535,0.0020094658,0.00062580616,0.0002678564,0.016328355,0.36604133,0.4038902,0.05625719,0.0012418617,0.0019427682],"about_ca_topic_score_codex":0.000044910605,"about_ca_topic_score_gemma":0.000040448682,"teacher_disagreement_score":0.6470886,"about_ca_system_score_codex":0.00006782269,"about_ca_system_score_gemma":0.00002481372,"threshold_uncertainty_score":0.75836205},"labels":[],"label_agreement":null},{"id":"W2938668898","doi":"10.29173/mocs10","title":"Production Monitoring and Process Improvement for Floor Panel Manufacturing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Installation; Process (computing); Factory (object-oriented programming); Modular design; Bridge (graph theory); Production (economics); Engineering; Production line; Computer science; Mechanical engineering","score_opus":0.011118841831716632,"score_gpt":0.2035844969300306,"score_spread":0.19246565509831398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938668898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9880517,0.00028971155,0.008982272,0.00021275529,0.0013471787,0.00051963347,0.000012888181,0.0003615324,0.00022232693],"genre_scores_gemma":[0.9955451,0.0003579162,0.0029885995,0.000008322093,0.0006113264,0.00019576318,0.0000036418216,0.00004008098,0.00024923834],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99876523,0.0000032453036,0.00031618908,0.00044894498,0.00016965852,0.0002967028],"domain_scores_gemma":[0.99949986,0.00001082237,0.00008533579,0.000088739864,0.00020032731,0.00011489104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001352079,0.0002637783,0.00021267786,0.00018489249,0.0002564216,0.00013608216,0.00006494932,0.00014506694,0.000013661803],"category_scores_gemma":[0.00002589603,0.00021523774,0.000050795406,0.00010220679,0.00013471342,0.00081360573,0.000021747031,0.00011843662,0.0000033066867],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059518767,0.000010983233,0.014463557,0.00055345224,0.00007920715,3.767911e-7,0.00027092925,0.000035197983,0.19860218,0.0011724663,0.000098181205,0.78465396],"study_design_scores_gemma":[0.0012652159,0.00012697568,0.009500699,0.00032551764,0.00009747065,0.000121546575,0.002359043,0.001479069,0.9756535,0.0032763944,0.0052158567,0.0005786961],"about_ca_topic_score_codex":0.000005008743,"about_ca_topic_score_gemma":0.000002270851,"teacher_disagreement_score":0.78407526,"about_ca_system_score_codex":0.00008161006,"about_ca_system_score_gemma":0.00001236955,"threshold_uncertainty_score":0.87771404},"labels":[],"label_agreement":null},{"id":"W2938947177","doi":"10.29173/mocs26","title":"Designing for Pre-Fabrication and Assembly in the Construction of UBCäó»s Tall Wood Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Procurement; Context (archaeology); Key (lock); Process (computing); Integrated project delivery; Engineering; Software deployment; Project team; Engineering design process; Construction engineering; Systems engineering; Computer science; Project management; Software engineering; Mechanical engineering; Operations management; Business","score_opus":0.00836181900101695,"score_gpt":0.211949529487032,"score_spread":0.20358771048601504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938947177","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8233222,0.00030893146,0.17508058,0.00016534643,0.00030238272,0.00041070784,0.000011366548,0.000094087176,0.00030445153],"genre_scores_gemma":[0.97418255,0.0002604219,0.025265353,0.000016899594,0.00013043071,0.00009760639,0.0000042702704,0.000021857053,0.000020641366],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988795,0.000017177836,0.00041241213,0.00029957932,0.00017131775,0.00022001006],"domain_scores_gemma":[0.99938506,0.000083401705,0.00014894776,0.00009526559,0.00023476507,0.000052567266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034260337,0.00020105319,0.0002289799,0.00026751196,0.00014554328,0.000095716176,0.00009605088,0.00016270723,0.000007244961],"category_scores_gemma":[0.00008047448,0.00015034826,0.000056591132,0.00028483724,0.00023722627,0.0006556509,0.000018079769,0.0001268019,6.267204e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009691859,0.000019992505,0.045237824,0.00035685062,0.000074581316,4.1083905e-7,0.0009527562,0.000071441165,0.44046673,0.08174435,0.00019936975,0.43077877],"study_design_scores_gemma":[0.008614362,0.0007194805,0.08146376,0.0018273034,0.0005334028,0.0011046423,0.017907014,0.06873086,0.75273025,0.047369525,0.016816584,0.0021827898],"about_ca_topic_score_codex":0.000012919123,"about_ca_topic_score_gemma":0.000009781944,"teacher_disagreement_score":0.428596,"about_ca_system_score_codex":0.000056899855,"about_ca_system_score_gemma":0.000016771104,"threshold_uncertainty_score":0.61310244},"labels":[],"label_agreement":null},{"id":"W2938981478","doi":"","title":"Simulation of the environmental impact of a Canadian house","year":2005,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Environmental impact assessment; Computer science; Architectural engineering; Engineering; Political science; Law","score_opus":0.008801550303157945,"score_gpt":0.19852788306838762,"score_spread":0.18972633276522968,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938981478","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96835643,0.000544128,0.016748663,0.0003888783,0.00022946065,0.00032089002,0.0002460984,0.00011191396,0.013053546],"genre_scores_gemma":[0.9974925,0.0001740254,0.0017759518,0.000005441016,0.000013976874,0.000011252983,0.00007147906,0.000030452242,0.00042489913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99861467,0.0005452445,0.00034688928,0.00016987763,0.00018359677,0.00013973408],"domain_scores_gemma":[0.99839485,0.00021177145,0.00020384256,0.00087351404,0.00023276337,0.00008326802],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005675836,0.00016071416,0.00017897581,0.0002581617,0.00007551343,0.00003680333,0.00042414185,0.00019137574,0.00018840231],"category_scores_gemma":[0.00013018583,0.00014138452,0.00022197897,0.00023537975,0.00013046987,0.000064564774,0.00012455526,0.0003005404,0.0000068410686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068438967,0.000144825,0.021385893,0.00012767034,0.00021951964,3.4078508e-7,0.008239723,0.8644719,0.012873637,0.006284827,0.00047282755,0.085772],"study_design_scores_gemma":[0.00035581065,4.0667288e-7,0.105373375,0.0008253266,0.00006814243,0.000004274151,0.00008001759,0.8180395,0.070292406,0.0007207887,0.0038843984,0.00035557194],"about_ca_topic_score_codex":0.024754675,"about_ca_topic_score_gemma":0.0524944,"teacher_disagreement_score":0.08541643,"about_ca_system_score_codex":0.00025271764,"about_ca_system_score_gemma":0.00018997007,"threshold_uncertainty_score":0.9817396},"labels":[],"label_agreement":null},{"id":"W2939040710","doi":"10.29173/mocs19","title":"Applying the Flow-interception Location Model to Select the Location of Construction Industrial Yard","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Yard; Industrialisation; Material flow; Heuristic; Engineering; Transport engineering; Operations research; Civil engineering; Computer science; Economics","score_opus":0.015984891539291328,"score_gpt":0.20169534886597545,"score_spread":0.18571045732668412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939040710","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5983868,0.00017433435,0.39750773,0.00071470626,0.0010776502,0.0012434025,0.000015291294,0.00026422756,0.0006158403],"genre_scores_gemma":[0.99527735,0.00012314219,0.0036187198,0.00006500398,0.00038183123,0.00039636754,0.000008983302,0.0000324306,0.00009618648],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984857,0.000028106413,0.0005374913,0.00035117567,0.0003363614,0.000261183],"domain_scores_gemma":[0.9987189,0.000041571147,0.00017685631,0.0001959826,0.00077760883,0.00008903716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000362925,0.0002705056,0.00023702248,0.00023772754,0.00033612977,0.00013110143,0.00017938078,0.00023245024,0.00003254513],"category_scores_gemma":[0.00010068933,0.00017018818,0.00007099775,0.0008540931,0.00034468606,0.0006237375,0.00003914289,0.00025897147,0.000017731463],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012780995,0.000013660326,0.008569571,0.0001231973,0.00010123332,1.1121655e-7,0.0006662248,0.0130322585,0.062212255,0.017716648,0.00139625,0.8960408],"study_design_scores_gemma":[0.0032325964,0.0003199274,0.005315445,0.0012768497,0.00044863494,0.0003435302,0.008763343,0.8254176,0.12489342,0.008559503,0.020072667,0.0013565288],"about_ca_topic_score_codex":0.00002086614,"about_ca_topic_score_gemma":0.000027932012,"teacher_disagreement_score":0.89468426,"about_ca_system_score_codex":0.00016141613,"about_ca_system_score_gemma":0.000060412174,"threshold_uncertainty_score":0.6940073},"labels":[],"label_agreement":null},{"id":"W2939173706","doi":"10.29173/mocs34","title":"Modular Industry Characteristics and Barriers to its Increased Market Share","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Work (physics); Engineering; Construction management; Business; Engineering management; Architectural engineering; Operations management; Construction engineering; Civil engineering; Marketing; Computer science","score_opus":0.0062029935869639735,"score_gpt":0.19105715839627652,"score_spread":0.18485416480931255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939173706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9938006,0.00018680067,0.0011120223,0.00014000355,0.0007085925,0.0002942837,0.000101237776,0.00032778314,0.0033286817],"genre_scores_gemma":[0.99695957,0.000088898574,0.0018393595,0.00021896824,0.0005150577,0.00004022778,0.000020295773,0.000044406683,0.00027321454],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986541,0.000011566391,0.00034880222,0.00044083392,0.00021464024,0.00033003883],"domain_scores_gemma":[0.9988997,0.000010745319,0.00007401476,0.00012384441,0.00037319132,0.0005184801],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001630403,0.00031443057,0.00028973483,0.00028437548,0.0003321341,0.0002619306,0.000108117914,0.0004135767,0.0006638626],"category_scores_gemma":[0.00012777148,0.00033656493,0.00004618623,0.00036003004,0.0002223936,0.000549296,0.000060000806,0.0004018775,0.000023428913],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043678225,0.00003935689,0.4526972,0.0010471239,0.00050391036,0.000018663102,0.0025359222,0.000031008673,0.16745536,0.015626855,0.018173736,0.3414341],"study_design_scores_gemma":[0.0041573565,0.00072671764,0.39492735,0.0011860852,0.00052153773,0.0012704476,0.009925015,0.1907657,0.10326759,0.0019265151,0.28735977,0.0039659096],"about_ca_topic_score_codex":0.000013850666,"about_ca_topic_score_gemma":0.000008672377,"teacher_disagreement_score":0.33746818,"about_ca_system_score_codex":0.000067796915,"about_ca_system_score_gemma":0.00003261823,"threshold_uncertainty_score":0.9999086},"labels":[],"label_agreement":null},{"id":"W2939479925","doi":"10.1139/cjce-2017-0692","title":"Decision support method for estimating monetary value of post-renovation office buildings","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Value (mathematics); Architectural engineering; Engineering; Civil engineering; Computer science","score_opus":0.00584344617281284,"score_gpt":0.21039592933617954,"score_spread":0.2045524831633667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939479925","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13678637,0.00023067836,0.8605123,0.000025258032,0.001926989,0.0001011005,0.00001574565,0.000020846053,0.00038071498],"genre_scores_gemma":[0.7222115,0.0000022824215,0.27759737,0.000013813621,0.00012650497,0.0000017923273,0.0000051619586,0.000025192325,0.000016396312],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914044,0.0000054101333,0.00046961993,0.00007399755,0.00012476314,0.0001857817],"domain_scores_gemma":[0.9992062,0.00012798833,0.000118778604,0.00009811969,0.00028717026,0.00016175056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003556841,0.00011682789,0.00022072058,0.00046530843,0.000025489499,0.000025831107,0.00012380263,0.000083899766,0.00013951997],"category_scores_gemma":[0.00015534891,0.00012365424,0.00009944361,0.0002048506,0.000007353532,0.00026938456,0.0000030499364,0.00017148627,0.0000030694548],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008538975,0.0000013903908,0.00021469891,0.000114251365,0.000044519275,0.0000021529029,0.00015693204,0.9495904,0.020181576,0.0018486948,0.0005691877,0.027267672],"study_design_scores_gemma":[0.00040325485,0.00011067424,0.0013706723,0.0002763599,0.000036365647,0.00016902975,0.00006830866,0.9861585,0.004738002,0.00026039188,0.0062425802,0.00016588833],"about_ca_topic_score_codex":0.00022161924,"about_ca_topic_score_gemma":0.0025580782,"teacher_disagreement_score":0.58542514,"about_ca_system_score_codex":0.00011806201,"about_ca_system_score_gemma":0.00019014261,"threshold_uncertainty_score":0.50424737},"labels":[],"label_agreement":null},{"id":"W2939569709","doi":"10.29173/mocs31","title":"Prefabricated Prefinished Volumetric Construction Joining Tech-niques Review","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation Singapore; National University of Singapore; National Research Foundation; Sembcorp Industries","keywords":"Constructability; Modular design; Computer science; Construction engineering; Engineering; Systems engineering","score_opus":0.008341770775595862,"score_gpt":0.19376896497600243,"score_spread":0.18542719420040657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939569709","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8275517,0.030394899,0.10223153,0.0018327546,0.003945699,0.002268499,0.00010987795,0.0054411786,0.026223863],"genre_scores_gemma":[0.95784265,0.02134226,0.019376244,0.00021664161,0.00036333784,0.0001915912,0.000027303753,0.00009785434,0.000542122],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979156,0.000024632991,0.0007169898,0.0005823136,0.0003439928,0.00041643946],"domain_scores_gemma":[0.9988637,0.000035301295,0.00022476591,0.00020564217,0.00047559285,0.00019498728],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028937982,0.00041777923,0.00049819815,0.00052200956,0.00025452473,0.00016166737,0.00016060377,0.00028697914,0.0002554992],"category_scores_gemma":[0.00013588832,0.00034286943,0.00014032816,0.0009858548,0.00036150048,0.0011076164,0.000049214126,0.0002923541,0.000048036232],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032473024,0.00001809408,0.034538206,0.0010044397,0.00014986857,0.0000019906024,0.000071311566,0.0000043799437,0.032599356,0.010265649,0.0061342684,0.91517997],"study_design_scores_gemma":[0.0074225,0.0008312269,0.037408218,0.015707504,0.0015502998,0.00407765,0.0019941023,0.0146855945,0.22125937,0.014804818,0.67432946,0.005929277],"about_ca_topic_score_codex":0.000011944643,"about_ca_topic_score_gemma":0.000004192529,"teacher_disagreement_score":0.9092507,"about_ca_system_score_codex":0.00015768873,"about_ca_system_score_gemma":0.000035797017,"threshold_uncertainty_score":0.9999023},"labels":[],"label_agreement":null},{"id":"W2939777093","doi":"10.29173/mocs35","title":"A BIM-based Supply Chain Integration for Prefabrication and Modularization","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Prefabrication; Supply chain; Schedule; Modular programming; Integrated project delivery; Precast concrete; Process (computing); Building information modeling; Manufacturing engineering; Systems engineering; Transport engineering; Computer science; Engineering; Operations management; Business; Civil engineering; Project management; Scheduling (production processes)","score_opus":0.006861548457437031,"score_gpt":0.1943483338728542,"score_spread":0.18748678541541716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939777093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5049661,0.00023204903,0.49260223,0.00023531675,0.0004930759,0.00054883066,0.000025634385,0.00034109605,0.0005556955],"genre_scores_gemma":[0.973308,0.00009126655,0.025812516,0.00007553127,0.00035648065,0.00014935131,0.00009916227,0.000037759346,0.00006988204],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998879,0.000009805368,0.00033832624,0.00038561,0.00016217897,0.00022504936],"domain_scores_gemma":[0.999192,0.000018958965,0.00010393981,0.00010202304,0.00048124813,0.000101846825],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017599367,0.0002454373,0.00020291706,0.00031748984,0.0003041167,0.00021874227,0.00006555393,0.00021110656,0.000022557802],"category_scores_gemma":[0.000049297847,0.00025154938,0.000053081327,0.00033679217,0.00025774544,0.0006307675,0.000013529748,0.00013054823,0.000004605389],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015200964,0.000032164477,0.024199452,0.00031389712,0.00007070156,2.4559523e-7,0.00064876257,0.00019897081,0.11309587,0.13301092,0.0007463802,0.72753066],"study_design_scores_gemma":[0.0015429987,0.00027822034,0.010132625,0.00015965459,0.00011461689,0.000050844985,0.0008036042,0.8558877,0.106461026,0.009074657,0.014908691,0.0005853231],"about_ca_topic_score_codex":0.000011170652,"about_ca_topic_score_gemma":0.000021656715,"teacher_disagreement_score":0.85568875,"about_ca_system_score_codex":0.00007317475,"about_ca_system_score_gemma":0.000022623966,"threshold_uncertainty_score":0.9999937},"labels":[],"label_agreement":null},{"id":"W2939869739","doi":"10.29173/mocs46","title":"Addressing the Impact of Industrialized Components on the Cost of Temporary Heating in Cold-climate Regions","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuel efficiency; Schedule; Context (archaeology); Consumption (sociology); Cost estimate; Environmental science; Building envelope; Envelope (radar); Environmental economics; Engineering; Computer science; Meteorology; Automotive engineering; Economics; Telecommunications; Geography","score_opus":0.06484120816958823,"score_gpt":0.274656107593629,"score_spread":0.2098148994240408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939869739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963674,0.000118884636,0.00033024378,0.00011355338,0.00027702755,0.00041672602,0.000027236036,0.000058332324,0.0022906295],"genre_scores_gemma":[0.99950784,0.000070346316,0.00021601516,0.000016742464,0.00012640015,0.000026163152,0.0000070757037,0.000018464545,0.000010956906],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998935,0.000032045806,0.0004618221,0.00017897642,0.00019046299,0.00020173224],"domain_scores_gemma":[0.99935347,0.0000645264,0.00021050673,0.00013110341,0.00019399157,0.000046410223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003382615,0.00018264682,0.00026566762,0.0001951697,0.00022602701,0.00006898828,0.00012492943,0.00013846786,0.000040817446],"category_scores_gemma":[0.000052250685,0.000119276934,0.0000927317,0.0004783308,0.00048558507,0.00024408726,0.000031786803,0.00028456812,0.000001888666],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00062720134,0.00012807985,0.5538507,0.00032170498,0.00041483485,0.0000020980874,0.002750652,0.0015866818,0.31926405,0.059145067,0.0037248125,0.058184095],"study_design_scores_gemma":[0.009285318,0.0011185383,0.20492949,0.0049550147,0.00026099983,0.0002771896,0.018582398,0.3083101,0.43975362,0.0055353623,0.005299563,0.001692417],"about_ca_topic_score_codex":0.00020595812,"about_ca_topic_score_gemma":0.0000178137,"teacher_disagreement_score":0.34892124,"about_ca_system_score_codex":0.00006446286,"about_ca_system_score_gemma":0.0000275168,"threshold_uncertainty_score":0.48639724},"labels":[],"label_agreement":null},{"id":"W2939946541","doi":"10.29173/mocs45","title":"Outcomes of the State-of-the-art Symposium: status, challenges and future directions of offsite construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Florida","keywords":"Bridge (graph theory); Modular design; Strengths and weaknesses; Construction industry; Economic shortage; Engineering; State (computer science); Factory (object-oriented programming); Adaptation (eye); Engineering management; Construction engineering; Architectural engineering; Business; Computer science","score_opus":0.005838141790964833,"score_gpt":0.18620917534503773,"score_spread":0.18037103355407288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939946541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9915346,0.0025898705,0.000293766,0.00041931603,0.0021435926,0.00033612794,0.00005957454,0.00009627987,0.002526869],"genre_scores_gemma":[0.9912005,0.0064942827,0.0019003671,0.000015682142,0.00018556464,0.000016689519,0.0000033582214,0.000027797834,0.00015577664],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99866515,0.00002414428,0.0005299112,0.00027774932,0.0002833731,0.0002196792],"domain_scores_gemma":[0.9988955,0.00002356931,0.00030415007,0.00020487762,0.00049726234,0.0000746125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013597537,0.00025061503,0.00037690272,0.00019501294,0.00021247772,0.00003280614,0.00012777833,0.00016369148,0.00002459225],"category_scores_gemma":[0.00002125545,0.00018275068,0.00013263148,0.00038590946,0.0011097809,0.00036903998,0.0000647403,0.00022632733,0.0000011446209],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009240971,0.000051720817,0.29878348,0.00084550324,0.00048586534,1.7109433e-7,0.0042424193,0.000043332206,0.050004814,0.037571214,0.00037467346,0.6075044],"study_design_scores_gemma":[0.0023755317,0.00032581104,0.58438736,0.0006466748,0.0005975874,0.00032561648,0.010624255,0.003944978,0.23692183,0.007250874,0.15162742,0.0009720595],"about_ca_topic_score_codex":0.000029079769,"about_ca_topic_score_gemma":0.0000927011,"teacher_disagreement_score":0.60653234,"about_ca_system_score_codex":0.000040236104,"about_ca_system_score_gemma":0.000033103894,"threshold_uncertainty_score":0.7452356},"labels":[],"label_agreement":null},{"id":"W2940100037","doi":"10.29173/mocs37","title":"IoT-based Inventory Control System Framework for Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Schedule; Modular design; Computer science; Control (management); Inventory control; Frame (networking); Internet of Things; Production (economics); Systems engineering; Operations research; Engineering; Civil engineering; Computer security","score_opus":0.008280878571245565,"score_gpt":0.20135190700173664,"score_spread":0.19307102843049107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940100037","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53179026,0.0004264702,0.46020946,0.00012473435,0.0037643802,0.0008647509,0.0000683282,0.0011902148,0.0015614374],"genre_scores_gemma":[0.9461689,0.000024554332,0.05233939,0.00010649307,0.0010479967,0.00018593608,0.000021833474,0.00006323044,0.000041674088],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982249,0.000019023884,0.0005623379,0.00050411024,0.00026803848,0.0004215538],"domain_scores_gemma":[0.998764,0.000048062935,0.00018977614,0.00017402584,0.00062567025,0.00019850097],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000242431,0.00038636103,0.0004403587,0.00034141692,0.0004561045,0.00022690749,0.00013251055,0.00044279362,0.0000722053],"category_scores_gemma":[0.00006411381,0.00040181045,0.00016728711,0.00036085257,0.0005913768,0.00033534857,0.0000146003085,0.0003003177,0.000024695286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096558646,0.000059408412,0.05041178,0.0023410786,0.00065373635,0.000003737114,0.00070121436,0.00045546418,0.03523407,0.6533647,0.0028594253,0.25294977],"study_design_scores_gemma":[0.011183951,0.0007838453,0.0030141245,0.0015162032,0.00086926745,0.00064263,0.010266566,0.77867794,0.087729976,0.020566316,0.08218814,0.0025610344],"about_ca_topic_score_codex":0.000012277132,"about_ca_topic_score_gemma":0.000007389995,"teacher_disagreement_score":0.7782225,"about_ca_system_score_codex":0.00018818135,"about_ca_system_score_gemma":0.00004879492,"threshold_uncertainty_score":0.99984336},"labels":[],"label_agreement":null},{"id":"W2940231597","doi":"10.29173/mocs54","title":"Design and static behavior of beam-to-beam-tied connection for modular steel buildings","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Key Research and Development Program of China; National Science Foundation","keywords":"Structural engineering; Connection (principal bundle); Modular design; Diagonal; Beam (structure); Engineering; Computer science; Geometry; Mathematics","score_opus":0.015229061714965273,"score_gpt":0.2252084719210123,"score_spread":0.20997941020604702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940231597","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84282166,0.0001632761,0.15505712,0.00007252326,0.0006379727,0.00091140874,0.000029678271,0.00016016273,0.00014618135],"genre_scores_gemma":[0.96542895,0.00012254281,0.03391919,0.000026749307,0.000120900964,0.00022371799,0.000011169679,0.00004866891,0.00009809298],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986007,0.0000073825054,0.00044812018,0.0004367688,0.00020988246,0.00029710834],"domain_scores_gemma":[0.99900603,0.00003221947,0.00022268432,0.00019700939,0.00037053064,0.00017154132],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00027467235,0.00030334518,0.00038998298,0.00029466389,0.00052370946,0.00030440185,0.00015194138,0.00021223101,0.000017757913],"category_scores_gemma":[0.00007735674,0.00032363518,0.000079572645,0.00012550062,0.00027807368,0.00078483834,0.00004516801,0.00017094755,0.0000020837633],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038070403,0.000066197805,0.028642593,0.0009685455,0.00027186348,0.0000023664645,0.0011101593,0.0022364294,0.68740565,0.017878361,0.00084555504,0.26019156],"study_design_scores_gemma":[0.005720024,0.0010457675,0.04330236,0.00061284396,0.000932981,0.00036605034,0.004287146,0.14686704,0.7751727,0.006452528,0.013273896,0.001966677],"about_ca_topic_score_codex":0.000033844557,"about_ca_topic_score_gemma":0.000006653823,"teacher_disagreement_score":0.25822487,"about_ca_system_score_codex":0.00006319115,"about_ca_system_score_gemma":0.000021386286,"threshold_uncertainty_score":0.99992156},"labels":[],"label_agreement":null},{"id":"W2940370212","doi":"10.29173/mocs1","title":"Advancing Formwork Systems for the Production of Precast Concrete Building Elements: from Manual to Robotic","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universität München; Deutscher Akademischer Austauschdienst","keywords":"Precast concrete; Formwork; Prefabrication; Production (economics); Flexibility (engineering); Engineering; Process (computing); Construction engineering; Productivity; Computer science; Civil engineering","score_opus":0.006812242377239999,"score_gpt":0.2075581749937642,"score_spread":0.20074593261652418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940370212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7237072,0.0009814735,0.27092558,0.00028281187,0.0027433413,0.0009837542,0.00004704668,0.0001923807,0.00013639119],"genre_scores_gemma":[0.98448783,0.00026254106,0.014267399,0.00001762117,0.00056072697,0.00018809979,0.0000066416974,0.00003576467,0.00017335241],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986496,0.000008510728,0.0004987964,0.0003489241,0.00020887447,0.00028532668],"domain_scores_gemma":[0.9992007,0.000076135126,0.00015809663,0.00013710509,0.00033651953,0.000091460446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025841853,0.00022425986,0.00027086932,0.00014962727,0.00022015181,0.000096147276,0.000117979405,0.00011180007,0.000017648374],"category_scores_gemma":[0.00011756884,0.00015791386,0.000075635,0.0002292383,0.00011502599,0.000584844,0.000030267634,0.00010122426,0.0000033636165],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002747541,0.000009943669,0.023967957,0.00062573235,0.000518922,4.6186275e-7,0.00072465336,0.0052478528,0.5313282,0.0330415,0.0050281864,0.39923185],"study_design_scores_gemma":[0.005198778,0.00089448376,0.009871913,0.005776844,0.0013240741,0.0003311909,0.019616429,0.2052026,0.5299132,0.005983672,0.21299374,0.0028931054],"about_ca_topic_score_codex":0.00003385544,"about_ca_topic_score_gemma":0.000010711894,"teacher_disagreement_score":0.39633876,"about_ca_system_score_codex":0.00010974691,"about_ca_system_score_gemma":0.000014723456,"threshold_uncertainty_score":0.64395404},"labels":[],"label_agreement":null},{"id":"W2941209672","doi":"10.3390/buildings9050103","title":"Data-Driven Design as a Vehicle for BIM and Sustainability Education","year":2019,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Project-based learning; Design studio; Experiential learning; Curriculum; Competence (human resources); Computer science; Engineering management; Studio; Engineering education; Engineering; Mathematics education; Psychology; Pedagogy","score_opus":0.013736458038791838,"score_gpt":0.25711850122586705,"score_spread":0.2433820431870752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2941209672","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85884714,0.0001873499,0.1390479,0.0002552285,0.0003840438,0.00053305126,0.000012060025,0.00014021649,0.00059298443],"genre_scores_gemma":[0.9904981,0.0000121981475,0.00908951,0.00004172582,0.000056459154,0.000042817654,0.000018100227,0.000010536528,0.00023051903],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965507,0.0000068911586,0.00007979743,0.00013486322,0.000039713974,0.00008365514],"domain_scores_gemma":[0.9996673,0.000036529225,0.0000141216,0.00018286858,0.00007140562,0.000027796603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093590555,0.00005496396,0.00005810194,0.000035644553,0.000030167179,0.000037850354,0.00007677647,0.000041674593,0.000029898776],"category_scores_gemma":[0.000046786496,0.00005489033,0.000011102406,0.00005836501,0.0000147227265,0.0002226061,0.00001671651,0.000041227668,0.000012354298],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010353926,0.0000802679,0.01735427,0.0008260214,0.00007776535,3.1374077e-7,0.0008541427,0.009952294,0.02403094,0.24961743,0.027280442,0.6698226],"study_design_scores_gemma":[0.00092677795,0.00018112517,0.006336692,0.00006390734,0.000056497778,0.000031029947,0.0020875146,0.5485997,0.010538607,0.07125899,0.3594238,0.000495321],"about_ca_topic_score_codex":0.000026149015,"about_ca_topic_score_gemma":0.0000020500663,"teacher_disagreement_score":0.66932726,"about_ca_system_score_codex":0.00005589974,"about_ca_system_score_gemma":0.00007588786,"threshold_uncertainty_score":0.22383626},"labels":[],"label_agreement":null},{"id":"W2942550638","doi":"10.1139/cjce-2018-0287","title":"BIM-based building design coordination: processes, bottlenecks, and considerations","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Process (computing); Documentation; Terminology; Systems engineering; Unavailability; Quality (philosophy); Risk analysis (engineering); Engineering design process; Computer science; Design process; Process management; Engineering; Work in process; Reliability engineering; Operations management; Business; Scheduling (production processes)","score_opus":0.008183486413252209,"score_gpt":0.175719144993077,"score_spread":0.1675356585798248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942550638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065312155,0.0035882022,0.9269301,0.00059983763,0.001699321,0.000188006,0.000011446764,0.00009136914,0.0015795208],"genre_scores_gemma":[0.9931271,0.00001061337,0.0066962885,0.000029961322,0.0000915428,0.0000030424962,0.0000011279193,0.000020353244,0.000019935518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994579,0.00000811353,0.00021985841,0.00006174426,0.000098097335,0.0001542657],"domain_scores_gemma":[0.9993446,0.00009008815,0.00004079969,0.000063847656,0.0002432587,0.00021742798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001556075,0.00010207663,0.00013133972,0.00034437826,0.000049803373,0.000101404825,0.000050440616,0.000061558116,0.00021406695],"category_scores_gemma":[0.0001495157,0.000109371504,0.000025640866,0.00018572001,0.0000158056,0.00025453014,0.000001407754,0.00016952593,0.0000034133168],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014557676,0.0000015019548,0.0010949679,0.00013001106,0.000036903424,0.000016938202,0.000098819866,0.9831879,0.0038388385,0.008804114,0.0020350663,0.00075346],"study_design_scores_gemma":[0.0016658128,0.00018862273,0.003341419,0.00092643243,0.000092091985,0.0013368408,0.00020204154,0.915453,0.018315602,0.0036449325,0.0539721,0.0008610932],"about_ca_topic_score_codex":0.000042699372,"about_ca_topic_score_gemma":0.0043891934,"teacher_disagreement_score":0.92781496,"about_ca_system_score_codex":0.00010526172,"about_ca_system_score_gemma":0.00048284596,"threshold_uncertainty_score":0.44600406},"labels":[],"label_agreement":null},{"id":"W2942955837","doi":"10.1139/cjce-2019-0019","title":"Introduction for Canadian Journal of Civil Engineering Special Issue of ICTIS 2017","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; University of Waterloo","funders":"","keywords":"Engineering; Civil engineering; Engineering ethics; Construction engineering; Forensic engineering","score_opus":0.004455960883173044,"score_gpt":0.1662300409362665,"score_spread":0.16177408005309346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942955837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5273497,0.013570753,0.2721314,0.0027033251,0.15768151,0.0015647265,0.00045974058,0.0001622748,0.02437655],"genre_scores_gemma":[0.99005175,0.000046275243,0.0009260922,0.000009242871,0.008750211,0.0000022070535,0.0000042300276,0.000055592143,0.00015438226],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99853534,0.000009230532,0.0007616766,0.000099994526,0.0001826222,0.0004111318],"domain_scores_gemma":[0.9984019,0.000047192378,0.00023507809,0.00017215442,0.00048874086,0.000654951],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00035556342,0.00021465078,0.00043528393,0.0012251282,0.000053395743,0.00007178772,0.00026530845,0.00016505316,0.001409197],"category_scores_gemma":[0.00021039488,0.00023624288,0.00021637722,0.00029866377,0.000028426863,0.00046730103,0.0000031609827,0.00044812646,0.000008860439],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014524384,0.000004263231,0.0012502958,0.0003120445,0.00027279748,0.00003440314,0.0009170931,0.90446365,0.006465157,0.0019216203,0.08071806,0.0036261019],"study_design_scores_gemma":[0.0011551384,0.00028999744,0.0034890682,0.0005270554,0.0001372251,0.0015366953,0.00037948255,0.04284266,0.0063799163,0.00014265887,0.942578,0.0005421128],"about_ca_topic_score_codex":0.0019303198,"about_ca_topic_score_gemma":0.3888682,"teacher_disagreement_score":0.8618599,"about_ca_system_score_codex":0.00046678967,"about_ca_system_score_gemma":0.0009499514,"threshold_uncertainty_score":0.9995037},"labels":[],"label_agreement":null},{"id":"W2943191952","doi":"10.1139/cjce-2018-0411","title":"A visual dashboard to monitor BIM model dynamics","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Dashboard; Timeline; Building information modeling; Process (computing); Computer science; Track (disk drive); System dynamics; Systems engineering; Project management; Visibility; Information model; Process management; Engineering; Software engineering; Operations management; Artificial intelligence","score_opus":0.004052188704957662,"score_gpt":0.18080867815736243,"score_spread":0.17675648945240477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943191952","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6734029,0.00030215443,0.31860775,0.00010426954,0.0032098223,0.00010658789,0.000017735794,0.00007856122,0.004170223],"genre_scores_gemma":[0.99846196,0.000005676036,0.0011793908,0.000027674869,0.00018064227,0.0000020654732,0.0000014825966,0.00003388035,0.00010721777],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935544,0.0000030238364,0.00023704204,0.000062691004,0.00010805368,0.0002337317],"domain_scores_gemma":[0.99932724,0.000010856998,0.000026107671,0.00008934273,0.00008960708,0.00045684722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007124238,0.000118884745,0.0001560105,0.00043779632,0.000020923006,0.000053693107,0.00012672094,0.00007220927,0.00010218918],"category_scores_gemma":[0.00001917904,0.00012812902,0.00006768868,0.00019456186,0.000006120875,0.00018253499,0.000003543739,0.0002312512,0.000036908274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001583524,8.991181e-7,0.0005359755,0.000021252092,0.000024922254,0.000007513223,0.00009934352,0.99304473,0.0011488865,0.0019155485,0.0005238608,0.0026754965],"study_design_scores_gemma":[0.00013117943,0.000033276923,0.0005705597,0.00008427547,0.000009396251,0.000056834164,0.000074006784,0.9961915,0.00036113453,0.000079935126,0.002253425,0.00015445023],"about_ca_topic_score_codex":0.00009715146,"about_ca_topic_score_gemma":0.02037814,"teacher_disagreement_score":0.32505906,"about_ca_system_score_codex":0.00034899852,"about_ca_system_score_gemma":0.00013637161,"threshold_uncertainty_score":0.9974974},"labels":[],"label_agreement":null},{"id":"W29448869","doi":"10.1080/00498254.2018.1438684","title":"Virtual design and construction in the AEC industry","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Institutes of Health Research; Fondation du CHUM","keywords":"Construction industry; Engineering; Construction engineering; Architectural engineering; Business; Computer science","score_opus":0.00939402973206346,"score_gpt":0.18766757910364257,"score_spread":0.1782735493715791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W29448869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5680934,0.000019086108,0.41147843,0.00015229303,0.0002787708,0.00007501692,2.2523652e-7,0.00009458753,0.019808197],"genre_scores_gemma":[0.99688184,0.000004393031,0.002954539,0.000065335,0.000043809432,0.00000725203,4.3524003e-7,0.0000028278719,0.00003955616],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997827,0.000029487148,0.00006190098,0.00004145146,0.000037329377,0.00004713004],"domain_scores_gemma":[0.9998939,0.00003754968,0.0000048819375,0.0000472116,0.000005964285,0.0000105046565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011086078,0.00003765084,0.000031627325,0.000030535375,0.000020090496,0.000022636435,0.000025504003,0.00008190837,0.00005205311],"category_scores_gemma":[0.000007882685,0.000025782194,0.000005246774,0.00006281423,0.00003130166,0.000063995685,0.000002025868,0.00015006064,0.0000068173563],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045316,0.0000044687317,0.0044840323,0.0000048137836,0.000006766461,3.5650126e-7,0.00040051687,0.00566263,0.0011485755,0.375786,0.0016023483,0.610895],"study_design_scores_gemma":[0.0015487171,0.00021281625,0.046252128,0.000049698672,0.000026951559,0.00055007543,0.010401199,0.86032796,0.016379915,0.037621226,0.026014363,0.00061493064],"about_ca_topic_score_codex":0.000009098934,"about_ca_topic_score_gemma":0.0000124393955,"teacher_disagreement_score":0.85466534,"about_ca_system_score_codex":0.000006703873,"about_ca_system_score_gemma":0.0000029849214,"threshold_uncertainty_score":0.10513674},"labels":[],"label_agreement":null},{"id":"W2945333586","doi":"10.1061/(asce)cp.1943-5487.0000841","title":"Integrating Variance Reduction Techniques and Parallel Computing in Construction Simulation Optimization","year":2019,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Speedup; Computer science; Computation; Variance reduction; Reduction (mathematics); Simulation-based optimization; Mathematical optimization; Pareto principle; Software; Multi-objective optimization; Multi-core processor; Variance (accounting); Algorithm; Parallel computing; Mathematics","score_opus":0.004872380495895294,"score_gpt":0.21010894403770325,"score_spread":0.20523656354180794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945333586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4140014,0.00017250192,0.5846026,0.000010889161,0.0006521785,0.00009862332,1.8731333e-7,0.000082988125,0.00037863982],"genre_scores_gemma":[0.8774238,0.00004695921,0.12232708,0.0000023428763,0.00017631326,6.9041977e-7,0.0000012835239,0.000019705014,0.0000018216056],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988538,0.000030267081,0.0006873517,0.00012247964,0.00014236855,0.00016370292],"domain_scores_gemma":[0.9994975,0.000107797016,0.00019631797,0.000072478615,0.00009277496,0.00003315794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004626915,0.00014966226,0.0002532635,0.00052865146,0.000025452233,0.000058540616,0.00006773876,0.000115381445,0.0000071722748],"category_scores_gemma":[0.00005068942,0.0001632427,0.000037752867,0.00040102916,0.000014893864,0.00043227267,0.000015776335,0.0004666218,5.0965576e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007895684,0.00000612868,0.004197338,0.00007161569,0.000008869557,0.0000029782032,0.00037106822,0.97601473,0.001591731,0.00082632806,0.0000014648867,0.016899839],"study_design_scores_gemma":[0.00041969106,0.00003542508,0.0021459193,0.0007852821,0.0000049394007,0.00029770995,0.0002277591,0.9952884,0.00051058334,0.000066285924,0.0000716137,0.00014643717],"about_ca_topic_score_codex":0.0000067878323,"about_ca_topic_score_gemma":0.000004283211,"teacher_disagreement_score":0.4634224,"about_ca_system_score_codex":0.00019035801,"about_ca_system_score_gemma":0.00001931506,"threshold_uncertainty_score":0.6656844},"labels":[],"label_agreement":null},{"id":"W2946490062","doi":"10.5281/zenodo.3741343","title":"Reuse and recycling of CDW materials and structures in energy efficient prefabricated elements for building refurbishment and construction - RE4","year":2020,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"European Commission","keywords":"Reuse; Architectural engineering; Engineering; Construction engineering; Civil engineering; Waste management","score_opus":0.019480877925263394,"score_gpt":0.21757752074672632,"score_spread":0.19809664282146291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946490062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993119,0.0001969128,0.005496575,0.00017846795,0.00006719727,0.00023190123,0.000084248546,0.0001661868,0.0004595305],"genre_scores_gemma":[0.9965842,0.00019962348,0.0028998514,0.000018591782,0.000033522643,1.3238598e-7,0.000100581594,0.0001592876,0.00000422456],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992952,0.000058688434,0.00024892468,0.00019124417,0.000088780995,0.000117163305],"domain_scores_gemma":[0.99967283,0.000011903569,0.00006163693,0.000096645585,0.00009323284,0.00006376092],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016806327,0.00008159125,0.00011555534,0.00011083997,0.00021542302,0.00014546506,0.00010282329,0.000043427666,0.00014536447],"category_scores_gemma":[0.00016917536,0.000086026404,0.000008313284,0.00015536278,0.000075928,0.000085129126,0.00016036732,0.00006109618,0.000001692684],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021110238,0.000019996913,0.00007357543,0.00045111874,0.00006459819,0.0000014422453,0.0018566612,0.0015217896,0.590586,0.02103008,0.0020601004,0.38212353],"study_design_scores_gemma":[0.0055744373,0.00096605497,0.006963415,0.0003863043,0.000106834814,0.00028883168,0.0026213648,0.11356927,0.5571825,0.0056263907,0.30577496,0.00093963876],"about_ca_topic_score_codex":0.000008199689,"about_ca_topic_score_gemma":1.9921373e-7,"teacher_disagreement_score":0.3811839,"about_ca_system_score_codex":0.00003457715,"about_ca_system_score_gemma":0.0000010951143,"threshold_uncertainty_score":0.3508055},"labels":[],"label_agreement":null},{"id":"W2947500462","doi":"","title":"A new environment adapted to preliminary design in industry","year":2018,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.016418537229412326,"score_gpt":0.2048371305147428,"score_spread":0.18841859328533048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947500462","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040942416,0.00058764016,0.93313557,0.0023673014,0.000414734,0.0006405596,0.00002069338,0.00035013072,0.021540975],"genre_scores_gemma":[0.76947844,0.00024166232,0.22244175,0.00007065157,0.00007730902,0.00020060377,0.00014435827,0.00007869947,0.0072665466],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99742496,0.0011766462,0.00042222708,0.00046364783,0.00025168157,0.00026081273],"domain_scores_gemma":[0.9980741,0.00026381444,0.00010754124,0.0011158792,0.00023286135,0.00020580523],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0014042011,0.0002819482,0.0002443927,0.00025969377,0.00007855982,0.00016879855,0.0005873166,0.0005858142,0.00056669925],"category_scores_gemma":[0.00019705915,0.0003281996,0.000079053185,0.0002518583,0.00006199395,0.0000887914,0.00041438927,0.00091730064,0.00015196328],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012099081,0.0004942154,0.0031141525,0.00030419193,0.00023643207,0.000017820485,0.023477223,0.08786043,0.008526616,0.03137001,0.047406655,0.7970713],"study_design_scores_gemma":[0.002198034,0.0000069330085,0.03088243,0.0089500435,0.00015491476,0.00006340211,0.00068109186,0.53875756,0.25550136,0.018702244,0.14112157,0.0029803915],"about_ca_topic_score_codex":0.00042729708,"about_ca_topic_score_gemma":0.00023928337,"teacher_disagreement_score":0.79409087,"about_ca_system_score_codex":0.00024905824,"about_ca_system_score_gemma":0.00016478942,"threshold_uncertainty_score":0.99991703},"labels":[],"label_agreement":null},{"id":"W2947958109","doi":"","title":"The use of International Suppliers and the effects it has on Just-In-Time delivery and Industrial Construction Processes","year":2017,"lang":"en","type":"article","venue":"Student Research Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"MacEwan University","funders":"","keywords":"Supply chain; Business; Flexibility (engineering); Rationalization (economics); Lead time; Process management; Supply chain management; Risk analysis (engineering); Industrial organization; Operations management; Marketing; Engineering; Economics","score_opus":0.1042623942846613,"score_gpt":0.340098885532653,"score_spread":0.2358364912479917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947958109","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957461,0.00008409266,0.000003717156,0.001452689,0.00026881343,0.00048398226,0.0000028580223,0.00001737862,0.0019404169],"genre_scores_gemma":[0.99849087,0.0010639137,0.000028907492,0.000009537573,0.00012542795,0.00008873537,8.2058364e-7,0.000007234554,0.00018453845],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990621,0.000018480396,0.00015070183,0.00013169514,0.00047940938,0.00015761645],"domain_scores_gemma":[0.99913764,0.00042420297,0.000051332718,0.00007985723,0.00027300272,0.000033983135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065003923,0.000079842845,0.00009839462,0.0001067143,0.0005218106,0.000908032,0.000267557,0.000066576365,0.0000056734307],"category_scores_gemma":[0.00094852486,0.000048212638,0.000014401568,0.00008472851,0.0010618814,0.0003403655,0.0001185981,0.00035504703,0.0000019922682],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034486603,0.00015540744,0.5653804,0.0009626568,0.0007183719,0.0000083935965,0.015691685,0.00008179329,0.01193651,0.094914936,0.04536012,0.26134107],"study_design_scores_gemma":[0.050920498,0.0025496243,0.48680684,0.0056345523,0.0002861153,0.00030032394,0.05346608,0.02979611,0.08595411,0.017228577,0.2650445,0.0020126577],"about_ca_topic_score_codex":0.00006391825,"about_ca_topic_score_gemma":0.000036056645,"teacher_disagreement_score":0.2593284,"about_ca_system_score_codex":0.000046657362,"about_ca_system_score_gemma":0.000034137593,"threshold_uncertainty_score":0.8756174},"labels":[],"label_agreement":null},{"id":"W2948224781","doi":"10.11159/iccste19.143","title":"Comparative insight on building code paradigm shift practice and updates: International perspectives","year":2019,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Paradigm shift; Computer science; Code (set theory); Data science; Programming language; Software engineering; Epistemology","score_opus":0.012790167116247012,"score_gpt":0.2384150367254012,"score_spread":0.2256248696091542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2948224781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9910855,0.00007370538,0.00026464934,0.001386121,0.00077954243,0.00017157022,0.000056889243,0.00007823836,0.0061037466],"genre_scores_gemma":[0.9992604,0.00012247638,0.00044946253,0.000039231876,0.00006230697,0.000012391022,0.000012429732,0.000012189859,0.000029096047],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991778,0.0000024132585,0.00023128164,0.0002086782,0.00027943382,0.00010035083],"domain_scores_gemma":[0.9996156,0.00004977836,0.00009839064,0.00004419182,0.0001527987,0.000039252052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000053528183,0.00017470875,0.00015458111,0.00012838031,0.00004471934,0.00009861967,0.00018398756,0.000055412434,0.000080482445],"category_scores_gemma":[0.000018178187,0.00013822388,0.00004052879,0.00009063234,0.00004696145,0.0005556704,0.000009095949,0.00022893373,0.0000019392987],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092057606,0.000010018872,0.0033836043,0.00005426951,0.00016967017,3.4038715e-7,0.0038872638,0.00818205,0.019881006,0.96377945,0.000022432381,0.00053786254],"study_design_scores_gemma":[0.0026000212,0.0003293715,0.38705438,0.0013035565,0.00014406828,0.00007864172,0.009410337,0.49576017,0.06876677,0.025897358,0.007424961,0.0012303537],"about_ca_topic_score_codex":0.000010909514,"about_ca_topic_score_gemma":0.000015478832,"teacher_disagreement_score":0.93788207,"about_ca_system_score_codex":0.000047699767,"about_ca_system_score_gemma":0.000009377408,"threshold_uncertainty_score":0.5636606},"labels":[],"label_agreement":null},{"id":"W2950132006","doi":"10.57938/6a762b56-2213-4947-9be9-7fdea3c79bd3","title":"Headquarters of the future: The impact of digitalization on headquarters structures and value added","year":2019,"lang":"en","type":"article","venue":"WU Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Berger (Canada)","funders":"","keywords":"Value (mathematics); Business; Industrial organization; Political science; Operations management; Economics; Computer science","score_opus":0.014743233496333403,"score_gpt":0.29808266675846423,"score_spread":0.28333943326213085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950132006","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958326,0.00014410439,0.00009157238,0.00020490674,0.00022572125,0.00024601188,0.000014616833,0.00001507283,0.0032253722],"genre_scores_gemma":[0.99983984,0.000022762204,0.0000072812527,0.000007046028,0.000054322987,0.000005225034,0.0000033206113,0.000008905014,0.000051318955],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99927956,0.000087656284,0.00012693321,0.00008668197,0.00029067512,0.0001284741],"domain_scores_gemma":[0.9995266,0.00008398212,0.000023632167,0.00025964103,0.00008186103,0.000024245559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018962625,0.00006658652,0.000084572086,0.00008115941,0.000051627932,0.000030623272,0.00012785314,0.00005095213,0.000056712972],"category_scores_gemma":[0.000016182092,0.000033915752,0.000056739034,0.00027390537,0.00012359921,0.000075360906,0.000013409587,0.0001770138,0.0000039196684],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005261585,0.00015306998,0.12266869,0.0006753123,0.0006553691,9.856531e-7,0.012099046,0.13831954,0.1785232,0.2559575,0.04183491,0.2485862],"study_design_scores_gemma":[0.0013481919,0.0012900778,0.8139832,0.00021861025,0.00001911189,0.00002388827,0.0066845673,0.09313286,0.06319118,0.017582368,0.002202026,0.00032389106],"about_ca_topic_score_codex":0.0000740962,"about_ca_topic_score_gemma":0.000013680818,"teacher_disagreement_score":0.6913145,"about_ca_system_score_codex":0.000038428803,"about_ca_system_score_gemma":0.00003080147,"threshold_uncertainty_score":0.13830443},"labels":[],"label_agreement":null},{"id":"W2952003046","doi":"10.1061/9780784482421.072","title":"Integrating Fuzzy Agent-Based Modeling and Multi-Criteria Decision-Making for Analyzing Construction Crew Performance","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources; University of Alberta","funders":"","keywords":"Crew; Decision support system; Multiple-criteria decision analysis; Fuzzy logic; Computer science; Operations research; Fuzzy set; Risk analysis (engineering); Management science; Engineering; Artificial intelligence; Business","score_opus":0.014300584952382208,"score_gpt":0.2539166227715008,"score_spread":0.23961603781911858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952003046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48208797,0.00007761406,0.5165283,0.0000050672725,0.00046891006,0.00013506263,0.0000026693153,0.00013262726,0.0005617791],"genre_scores_gemma":[0.7427757,0.000015882208,0.257084,0.000021370288,0.000044982695,0.000018819155,0.0000062160443,0.000017814556,0.000015208074],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999238,0.000009120769,0.00029346798,0.00019985216,0.000083726074,0.00017584494],"domain_scores_gemma":[0.9996197,0.00008283464,0.000036745278,0.00012622966,0.000096198695,0.00003825877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013850917,0.00015141309,0.00015849603,0.00015830128,0.000118469856,0.00011196022,0.000057107878,0.00008733808,0.00009131241],"category_scores_gemma":[0.00003253696,0.00013853649,0.000054516888,0.00012777487,0.0000206562,0.00033582168,0.00001084609,0.00011858875,0.000010487797],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046651865,0.000007721879,0.0096299825,0.00021128857,0.00003444147,2.2706435e-7,0.00018557734,0.2249278,0.011247864,0.0027819686,0.000033780678,0.7508927],"study_design_scores_gemma":[0.00046001587,0.000023533981,0.00015548042,0.0002445802,0.000014336,0.000011303165,0.00052247575,0.99680793,0.0012316193,0.00028541082,0.00006889656,0.00017440852],"about_ca_topic_score_codex":0.000006945306,"about_ca_topic_score_gemma":0.000021926355,"teacher_disagreement_score":0.77188015,"about_ca_system_score_codex":0.000055110315,"about_ca_system_score_gemma":0.000017118411,"threshold_uncertainty_score":0.5649354},"labels":[],"label_agreement":null},{"id":"W2952447596","doi":"","title":"Analyzing BIM topics and clusters through ten years of scientific publications","year":2019,"lang":"en","type":"preprint","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Data science; Regional science; Library science; Engineering ethics; Engineering; Geography; Computer science","score_opus":0.015112203022045117,"score_gpt":0.24106079972884312,"score_spread":0.225948596706798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952447596","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9179402,0.0018154255,0.054369155,0.0019225024,0.006096422,0.0006103129,0.00010715433,0.00041969708,0.01671912],"genre_scores_gemma":[0.991943,0.0001761734,0.004228173,0.000014358586,0.00013002496,0.00002277243,0.000074915835,0.000026026362,0.0033845508],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99923533,0.000018663832,0.00020881242,0.00026289624,0.00013957532,0.00013469595],"domain_scores_gemma":[0.9992907,0.000025376408,0.000088090484,0.00045689556,0.00010040852,0.000038528608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011871417,0.00013169037,0.00019122614,0.00023105727,0.0000496841,0.00018968148,0.00016363405,0.00019535515,0.000053859465],"category_scores_gemma":[0.00003350027,0.0001448832,0.00006866039,0.0002619726,0.00010346462,0.0001637912,0.000121514684,0.0002964453,0.000023394485],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041788142,0.00015724622,0.07447184,0.0035424377,0.001452682,0.000004851296,0.020918347,0.21150976,0.009166483,0.2110163,0.06895295,0.39876533],"study_design_scores_gemma":[0.0014846174,0.000073291136,0.115278274,0.0012701721,0.0005189773,0.00004494809,0.003994394,0.22346647,0.007917793,0.01441115,0.62916744,0.0023724628],"about_ca_topic_score_codex":0.000039581093,"about_ca_topic_score_gemma":0.000079324775,"teacher_disagreement_score":0.5602145,"about_ca_system_score_codex":0.000055963097,"about_ca_system_score_gemma":0.0000614892,"threshold_uncertainty_score":0.59081656},"labels":[],"label_agreement":null},{"id":"W2953439837","doi":"10.29173/mocs126","title":"Consequences of the BC Energy Step Code on Offsite Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Sustainability; Efficient energy use; Building code; Building envelope; Architectural engineering; Construction industry; Norm (philosophy); Civil engineering; Engineering; Environmental economics; Construction engineering; Geography; Political science; Economics; Meteorology","score_opus":0.005395932876814841,"score_gpt":0.1748419891560745,"score_spread":0.16944605627925965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953439837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98276675,0.00032768113,0.0023186405,0.00019655787,0.002379442,0.00031410923,0.00004523109,0.00025386747,0.011397712],"genre_scores_gemma":[0.99685675,0.00024988333,0.0020845581,0.00009067613,0.00014776387,0.000024497027,0.000010691836,0.00003490002,0.00050026627],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99836504,0.000024180512,0.0005166987,0.0004217043,0.0003814271,0.00029092518],"domain_scores_gemma":[0.99912524,0.000032048014,0.00022685179,0.00022347843,0.00029275139,0.00009964593],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014094095,0.00033054873,0.00037290136,0.0002481934,0.00020104925,0.00011419654,0.00019274275,0.00025901306,0.00017966972],"category_scores_gemma":[0.00002101499,0.0002735843,0.00015093044,0.00046242413,0.0006885264,0.0004500903,0.000042301985,0.00030987582,0.000021877777],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017312208,0.00004182255,0.17149626,0.0004375728,0.00029666818,0.0000015577733,0.00036114178,0.0010174186,0.18312776,0.42237175,0.0016813737,0.21899354],"study_design_scores_gemma":[0.003977419,0.0005170519,0.023516577,0.0011135575,0.0003699391,0.0009721297,0.0075113107,0.033821262,0.7353484,0.011335219,0.17952581,0.0019913514],"about_ca_topic_score_codex":0.00007713402,"about_ca_topic_score_gemma":0.000037531867,"teacher_disagreement_score":0.5522206,"about_ca_system_score_codex":0.000087550325,"about_ca_system_score_gemma":0.000044780365,"threshold_uncertainty_score":0.9999716},"labels":[],"label_agreement":null},{"id":"W2953527716","doi":"10.29173/mocs103","title":"Transfer Learning Enabled Process Recognition for Module Installation of High-rise Modular Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Automation; Computer science; Engineering; Convolutional neural network; Building automation; Embedded system; Software engineering; Systems engineering; Artificial intelligence; Operating system; Mechanical engineering","score_opus":0.006434172699105438,"score_gpt":0.1866436558455424,"score_spread":0.18020948314643698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953527716","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9586818,0.00020998802,0.03862064,0.000041873696,0.0005447122,0.0007539038,0.00003134426,0.00032465704,0.0007910711],"genre_scores_gemma":[0.9939396,0.00015486954,0.0053380714,0.000016486956,0.00014249586,0.00010110622,0.00008613057,0.000060698105,0.00016057379],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984278,0.000011686191,0.00053258904,0.0004535577,0.00026874145,0.000305593],"domain_scores_gemma":[0.9990546,0.000023328346,0.00011994864,0.0000985339,0.00060524105,0.000098340206],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022018657,0.00030953507,0.00040498687,0.0003695444,0.00017228078,0.00010843881,0.0000963006,0.00028887996,0.000100621386],"category_scores_gemma":[0.000032015603,0.00033423642,0.00012430253,0.00040218153,0.000113079295,0.0012924628,0.00001331698,0.00028349945,0.000009552455],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005362314,0.00007938908,0.044239026,0.0034900957,0.00037889415,8.781831e-7,0.001581337,0.03967902,0.43914175,0.027843649,0.00012694996,0.44290277],"study_design_scores_gemma":[0.006387259,0.00062333955,0.0053012404,0.0007590343,0.00040220848,0.00012672805,0.005091168,0.40217924,0.54618156,0.018748747,0.012542435,0.0016570177],"about_ca_topic_score_codex":0.00002258449,"about_ca_topic_score_gemma":0.000004983414,"teacher_disagreement_score":0.44124576,"about_ca_system_score_codex":0.00006005271,"about_ca_system_score_gemma":0.000025240839,"threshold_uncertainty_score":0.99991095},"labels":[],"label_agreement":null},{"id":"W2953581745","doi":"10.29173/mocs87","title":"Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Ontology; Information model; Quality (philosophy); Computer science; Quality assurance; Frame (networking); Product (mathematics); Control (management); Systems engineering; Engineering; Software engineering; Artificial intelligence","score_opus":0.01565666423060389,"score_gpt":0.20956941531777623,"score_spread":0.19391275108717235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953581745","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7383643,0.00017146507,0.25862083,0.00011356222,0.00051138975,0.0011446713,0.00007553589,0.00038081023,0.00061744003],"genre_scores_gemma":[0.90162003,0.00004201255,0.09776906,0.000041521995,0.00013359111,0.0002075927,0.000072288676,0.000044421824,0.000069451315],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978921,0.000028055183,0.00085061375,0.0006007945,0.00027456137,0.00035388078],"domain_scores_gemma":[0.9987139,0.00005955591,0.00035376297,0.00021509791,0.00057619455,0.000081472164],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036282453,0.00036437018,0.0005699698,0.0004452794,0.00020892781,0.0001092967,0.00012030919,0.0003098841,0.000046152414],"category_scores_gemma":[0.0000637271,0.0003845861,0.00015464882,0.00035756826,0.000256839,0.0006429515,0.000013994513,0.00028079926,0.0000073133324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006512717,0.00025083782,0.076555595,0.006150774,0.0006879895,3.1601962e-7,0.0007397105,0.06271743,0.28820264,0.23497486,0.00069741503,0.32837114],"study_design_scores_gemma":[0.0022203058,0.00009379287,0.0045635584,0.000083898514,0.00015631045,0.000058473717,0.00053312385,0.9314238,0.05642942,0.0028466831,0.0011080828,0.00048256145],"about_ca_topic_score_codex":0.000017001728,"about_ca_topic_score_gemma":0.000010169736,"teacher_disagreement_score":0.86870635,"about_ca_system_score_codex":0.00015715248,"about_ca_system_score_gemma":0.000079938894,"threshold_uncertainty_score":0.9998606},"labels":[],"label_agreement":null},{"id":"W2953662108","doi":"10.22260/isarc2019/0060","title":"Text Detection and Classification of Construction Documents","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Optical character recognition; Information retrieval; Set (abstract data type); Bounding overwatch; Task (project management); Minimum bounding box; Artificial intelligence; Class (philosophy); Character (mathematics); Document processing; Download; Deep learning; Document management system; Data set; Control (management); Natural language processing; Image (mathematics); World Wide Web","score_opus":0.0059783581220688164,"score_gpt":0.1911489674612615,"score_spread":0.1851706093391927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953662108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98117363,0.00004092651,0.00012948138,0.000036658148,0.00037898097,0.00013433624,0.000001500873,0.000036823727,0.01806763],"genre_scores_gemma":[0.9995047,0.00002783035,0.00030961682,0.0000029063292,0.000020746947,0.000006108462,2.7234967e-7,0.0000066258376,0.000121232566],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996162,0.0000016692629,0.00015441803,0.0000731547,0.000100525314,0.000054013217],"domain_scores_gemma":[0.99974704,0.0000067376823,0.0000881978,0.00004521615,0.000100364574,0.000012437594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005956345,0.00005626423,0.00007652248,0.00005533991,0.000022632215,0.000012426981,0.0000585389,0.000051563165,0.000024038585],"category_scores_gemma":[0.000011192198,0.00004452155,0.000026968059,0.0001330076,0.000061115454,0.0001967595,0.000012738843,0.00006828162,0.000005392239],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010560709,0.0000040116533,0.02588018,0.00012668817,0.000015928083,1.3701604e-9,0.0001401122,0.000013239815,0.91493773,0.012329413,0.00006198362,0.04648017],"study_design_scores_gemma":[0.0004218843,0.00005188932,0.11318878,0.000110922265,0.000036187077,0.000028179236,0.0014279708,0.011224237,0.865013,0.006678753,0.0016883746,0.00012980514],"about_ca_topic_score_codex":0.000005793247,"about_ca_topic_score_gemma":0.0000013407902,"teacher_disagreement_score":0.0873086,"about_ca_system_score_codex":0.000023216198,"about_ca_system_score_gemma":0.0000036581089,"threshold_uncertainty_score":0.1815536},"labels":[],"label_agreement":null},{"id":"W2953682657","doi":"10.22260/isarc2019/0016","title":"Implementation Framework for BIM Adoption and Project Management in Public Organizations","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Government (linguistics); Corporate governance; Process management; Software deployment; Business; Public sector; Order (exchange); Knowledge management; Computer science; Operations management; Engineering; Economics; Finance","score_opus":0.011916885738890198,"score_gpt":0.24777421017786458,"score_spread":0.2358573244389744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953682657","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98679674,0.000052798256,0.007357113,0.0004134914,0.00029691213,0.0010816349,0.000007008597,0.000077010496,0.0039172987],"genre_scores_gemma":[0.98908633,0.000047706122,0.010682757,0.000018418561,0.000023536832,0.000072502415,0.000003512003,0.000011523944,0.00005371365],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996277,0.0000013593796,0.00013260328,0.000081366976,0.000071940616,0.000084994455],"domain_scores_gemma":[0.9998101,0.000009292573,0.000040663523,0.00003658427,0.00009434171,0.00000900223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007923726,0.000055758956,0.000057033794,0.00010743576,0.000030061114,0.000038290524,0.00006907422,0.000037581172,0.000023495822],"category_scores_gemma":[0.000013456745,0.000046063662,0.000015072927,0.00038663452,0.000012677505,0.00020095885,0.000021306218,0.000053243646,0.0000018086205],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005712041,0.000011484759,0.058394667,0.00031170924,0.000029003819,6.178087e-9,0.00058177515,0.000032817814,0.0042646183,0.91570246,0.0005997341,0.020065995],"study_design_scores_gemma":[0.004822182,0.0003215928,0.2909323,0.00082769064,0.00023965801,0.000028152153,0.062832184,0.039745327,0.088725045,0.4715517,0.038760494,0.0012136843],"about_ca_topic_score_codex":0.000005351179,"about_ca_topic_score_gemma":0.0000059889417,"teacher_disagreement_score":0.4441508,"about_ca_system_score_codex":0.000037630223,"about_ca_system_score_gemma":0.000006403043,"threshold_uncertainty_score":0.18784216},"labels":[],"label_agreement":null},{"id":"W2953811449","doi":"10.29173/mocs131","title":"A Survey on Information Flow Tools in Alberta’s Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Digitization; Information flow; Supply chain; Schedule; Information exchange; Key (lock); Phone; Quality (philosophy); Construction industry; Business; Dissemination; Computer science; Process management; Knowledge management; Marketing; Engineering; Construction engineering; Telecommunications; Computer security","score_opus":0.009220101536522788,"score_gpt":0.19234379812503383,"score_spread":0.18312369658851105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953811449","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98744965,0.00005243424,0.00073173747,0.00009894729,0.0015007214,0.0004488801,0.000048719357,0.0002127058,0.009456219],"genre_scores_gemma":[0.9980561,0.000078160105,0.0012794033,0.00009958567,0.0001040559,0.000037277223,0.00013366068,0.000027150942,0.0001846075],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99849164,0.000022249253,0.0005561891,0.00032315278,0.0002815887,0.00032516895],"domain_scores_gemma":[0.99932975,0.000050589406,0.00012839606,0.00014620759,0.00022443401,0.00012059849],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026149856,0.00032143452,0.0003283784,0.00053245155,0.00010677719,0.0002917119,0.00010656787,0.0005576028,0.00019417264],"category_scores_gemma":[0.00007925887,0.00034001135,0.00006631636,0.0005792935,0.00013197729,0.002099724,0.000026645297,0.0007207659,0.00014057636],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015055173,0.00002380795,0.5236102,0.00020768738,0.00007395165,9.039421e-7,0.00054081815,0.0031514019,0.0010746762,0.017252807,0.001028723,0.4528845],"study_design_scores_gemma":[0.0057839844,0.00038266403,0.68839055,0.0007553021,0.00008626484,0.00032950134,0.0049025575,0.21943061,0.012645204,0.0023534414,0.06266996,0.002269947],"about_ca_topic_score_codex":0.0002686995,"about_ca_topic_score_gemma":0.0002465967,"teacher_disagreement_score":0.45061454,"about_ca_system_score_codex":0.00016269062,"about_ca_system_score_gemma":0.000038258397,"threshold_uncertainty_score":0.99990517},"labels":[],"label_agreement":null},{"id":"W2953859525","doi":"10.22260/isarc2019/0007","title":"BIM-based Takt-Time Planning and Takt Control: Requirements for Digital Construction Process Management","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lean construction; Process management; Process (computing); Engineering; Building information modeling; Production planning; Computer science; Manufacturing engineering; Systems engineering; Construction engineering; Operations management; Production (economics); Construction industry","score_opus":0.0061414955240490345,"score_gpt":0.2037670396461865,"score_spread":0.19762554412213748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953859525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9779792,0.000077232675,0.004727783,0.00015809729,0.00045349856,0.0009807083,0.00004417016,0.00017760396,0.015401694],"genre_scores_gemma":[0.9983201,0.0000019089268,0.0013479384,0.000029802739,0.000042867876,0.000058759146,0.0000039668075,0.000019973071,0.00017465535],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993245,0.0000011013324,0.00020604294,0.00015318405,0.00016363882,0.00015154606],"domain_scores_gemma":[0.99967337,0.0000162297,0.00009904093,0.000057261866,0.00012482342,0.000029265055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008463113,0.00012508738,0.00014433893,0.000078955,0.000068500005,0.00008486622,0.00012561552,0.000054653017,0.000013753886],"category_scores_gemma":[0.000014669329,0.000100477766,0.000051284384,0.00011507487,0.00006585489,0.00035507634,0.000016240412,0.000068825284,0.0000057564284],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013529807,0.0001940276,0.35080266,0.010782875,0.0014067523,6.140723e-7,0.0019118597,0.011450094,0.2669631,0.19057186,0.0051565235,0.15940665],"study_design_scores_gemma":[0.01814635,0.0007604908,0.012948749,0.0032165053,0.0006911856,0.00008995623,0.009140817,0.52841985,0.30411032,0.105506554,0.014861613,0.0021076158],"about_ca_topic_score_codex":5.4977966e-7,"about_ca_topic_score_gemma":5.351586e-8,"teacher_disagreement_score":0.51696974,"about_ca_system_score_codex":0.000032330376,"about_ca_system_score_gemma":0.000007156009,"threshold_uncertainty_score":0.40973642},"labels":[],"label_agreement":null},{"id":"W2953903615","doi":"10.29173/mocs85","title":"Just-in-Time Delivery Requires Just-in-Time Production X2 – Sychronising Factory and Site for Successful Prefabrication","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Factory (object-oriented programming); Schedule; Production (economics); Work (physics); Critical path method; Production schedule; Operations management; Order (exchange); Computer science; Operations research; Engineering; Business; Scheduling (production processes); Civil engineering; Systems engineering; Finance","score_opus":0.007860013978445287,"score_gpt":0.2019397066099514,"score_spread":0.1940796926315061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953903615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995837,0.000733117,0.0007735959,0.00011610005,0.000700585,0.0009293724,0.000017767572,0.00025538355,0.00063709664],"genre_scores_gemma":[0.9969696,0.00034848024,0.0017379276,0.000029337216,0.00023108271,0.0000810794,0.00005028612,0.000050036157,0.00050220045],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99816984,0.000017048967,0.0005286937,0.0006433742,0.0002692108,0.00037181133],"domain_scores_gemma":[0.9993536,0.00003212432,0.0001471231,0.00015054937,0.00021957753,0.00009701622],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003092932,0.0003302913,0.000377649,0.00054242904,0.00015400516,0.00025654986,0.000117326344,0.00027433425,0.00006035485],"category_scores_gemma":[0.00003647929,0.0003621164,0.00006941997,0.0004047366,0.00015411396,0.0014835123,0.000039373084,0.00026901712,0.00003250625],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033037717,0.00007385279,0.5131784,0.0014763956,0.000098162105,0.0000019004278,0.0015243276,0.0015218365,0.366939,0.0016202427,0.00074900454,0.112486444],"study_design_scores_gemma":[0.011190786,0.00078731705,0.31680647,0.0028729578,0.0005847579,0.00069481944,0.007723171,0.44097155,0.18166184,0.003862513,0.028168306,0.0046754917],"about_ca_topic_score_codex":0.000040751205,"about_ca_topic_score_gemma":0.000029184526,"teacher_disagreement_score":0.43944973,"about_ca_system_score_codex":0.00022464592,"about_ca_system_score_gemma":0.000030795345,"threshold_uncertainty_score":0.99988306},"labels":[],"label_agreement":null},{"id":"W2953915164","doi":"10.29173/mocs134","title":"Mass Timber in High-Rise Buildings: Modular Design and Construction; Permitting and Contracting Issues","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Documentation; Adaptability; Process (computing); Architectural engineering; Construction engineering; Engineering; Risk analysis (engineering); Order (exchange); Flexibility (engineering); Business; Computer science","score_opus":0.005312865482763209,"score_gpt":0.18984113200233252,"score_spread":0.1845282665195693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953915164","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9827974,0.0019376037,0.012655569,0.00016586125,0.0006965594,0.00053182506,0.000007469931,0.00029643878,0.0009112916],"genre_scores_gemma":[0.9340371,0.0008072635,0.06471878,0.000037956554,0.00016980745,0.00003555769,0.0000061215464,0.000052428422,0.00013501693],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981669,0.000029602788,0.0005401563,0.0006160122,0.00023924018,0.00040804566],"domain_scores_gemma":[0.99930775,0.00006249383,0.0001535303,0.00012152391,0.00019494019,0.00015974969],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003918653,0.00039759255,0.00047732855,0.00039806872,0.00022894684,0.0003607584,0.000081251404,0.00031007803,0.0000695937],"category_scores_gemma":[0.000051278956,0.0004244367,0.000050908817,0.00033057932,0.00030844673,0.0011912772,0.000043929416,0.00046487898,0.000009462054],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016707437,0.000029155242,0.5629356,0.000762846,0.00023671146,0.000014033,0.0015374162,0.003654055,0.12741053,0.05904859,0.00020137674,0.24400264],"study_design_scores_gemma":[0.009708794,0.00042031647,0.04979133,0.0014103524,0.00042492696,0.0028364037,0.024644837,0.7987469,0.06096125,0.029562846,0.01784496,0.0036470783],"about_ca_topic_score_codex":0.000064535794,"about_ca_topic_score_gemma":0.000006301622,"teacher_disagreement_score":0.7950929,"about_ca_system_score_codex":0.00008348477,"about_ca_system_score_gemma":0.000019024708,"threshold_uncertainty_score":0.99982077},"labels":[],"label_agreement":null},{"id":"W2953959273","doi":"10.29173/mocs111","title":"Development of a Design-Driven Parametric Mass Timber Construction System for Modular High-Rise Urban Housing","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Modular design; Architectural engineering; Architecture; Process (computing); Engineering; Civil engineering; Sustainability; Construction engineering; Sustainable development; Parametric statistics; Retrofitting; Computer science; Systems engineering; Geography; Structural engineering","score_opus":0.009357393229763351,"score_gpt":0.1830701828570766,"score_spread":0.17371278962731326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953959273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73159325,0.00023218685,0.26551998,0.000010266598,0.0011680459,0.0007557543,0.000019104999,0.00031964615,0.00038177293],"genre_scores_gemma":[0.7642316,0.000029153522,0.23540999,0.000005397255,0.00011833519,0.00008469056,0.000021177382,0.00004973939,0.00004988621],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99802965,0.000017382521,0.00074232393,0.0005031021,0.00033357218,0.00037398972],"domain_scores_gemma":[0.998926,0.000037420097,0.0002730131,0.00016548051,0.00046173684,0.0001363635],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002702915,0.0003806011,0.00052526116,0.00059240276,0.0002282904,0.00014263997,0.00013053675,0.00031346912,0.00003566513],"category_scores_gemma":[0.000021150434,0.00039818085,0.00012487729,0.0006135016,0.00016821791,0.00056253024,0.000028198123,0.00021630603,0.000019942116],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063175644,0.00009892565,0.115456544,0.0060369284,0.0013267903,0.0000045518173,0.0020423725,0.041370418,0.4392845,0.08539447,0.00080190325,0.30755085],"study_design_scores_gemma":[0.00490405,0.00027162113,0.0036403732,0.00090509816,0.00046954397,0.00028089722,0.008135888,0.6352515,0.33115736,0.0015291441,0.011651005,0.0018035205],"about_ca_topic_score_codex":0.000008152507,"about_ca_topic_score_gemma":0.0000020841978,"teacher_disagreement_score":0.5938811,"about_ca_system_score_codex":0.00025630806,"about_ca_system_score_gemma":0.000066088214,"threshold_uncertainty_score":0.999847},"labels":[],"label_agreement":null},{"id":"W2953967953","doi":"10.22260/isarc2019/0137","title":"Simulating Wood-framing Wall Panels Production with Timed Coloured Petri Nets","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Framing (construction); Petri net; Computer science; Digitization; Building information modeling; Dataflow; Modular programming; Original equipment manufacturer; Context (archaeology); Compatibility (geochemistry); Systems engineering; Industrial engineering; Software engineering; Architectural engineering; Engineering; Programming language","score_opus":0.006493341614220795,"score_gpt":0.18416065318796065,"score_spread":0.17766731157373986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953967953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9868132,0.000042227373,0.00004260952,0.0002649292,0.00044888153,0.0003473019,9.315926e-7,0.00017241733,0.011867506],"genre_scores_gemma":[0.9976497,0.0000046453442,0.0008751905,0.000022050326,0.00008976823,0.000013531004,9.45751e-7,0.000026615184,0.0013175063],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992451,0.0000029375785,0.0001955843,0.00016493419,0.00021978862,0.00017165938],"domain_scores_gemma":[0.99955744,0.000019378826,0.000108598615,0.000092725655,0.0001930401,0.000028803137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012026215,0.0001295758,0.0001470638,0.00006979143,0.00006564241,0.000039715032,0.00015636768,0.000070851,0.000041206225],"category_scores_gemma":[0.000054278353,0.000091702444,0.000044999088,0.0003095001,0.000039921397,0.00026954678,0.000025293524,0.00019406102,0.000017796116],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013137642,0.00005650926,0.059136167,0.0007570128,0.00019510656,2.2882296e-7,0.0041740453,0.026866347,0.86975396,0.0035992805,0.0017989666,0.03353098],"study_design_scores_gemma":[0.0015944709,0.00029848723,0.038545698,0.0009810271,0.00015247893,0.00010243864,0.0033906384,0.16766536,0.77552575,0.0017243066,0.009171242,0.0008481141],"about_ca_topic_score_codex":0.00000957556,"about_ca_topic_score_gemma":0.0000017387453,"teacher_disagreement_score":0.14079902,"about_ca_system_score_codex":0.000055606004,"about_ca_system_score_gemma":0.000013019139,"threshold_uncertainty_score":0.3739517},"labels":[],"label_agreement":null},{"id":"W2953983168","doi":"10.22260/isarc2019/0058","title":"A Chatbot System for Construction Daily Report Information Management","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Chatbot; Computer science; World Wide Web","score_opus":0.004110527566773909,"score_gpt":0.17399805556844855,"score_spread":0.16988752800167464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953983168","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73460466,0.0000415905,0.013210626,0.0002154859,0.0043363706,0.0018418818,0.00001452281,0.00050260854,0.24523228],"genre_scores_gemma":[0.994583,0.0000047231374,0.00490797,0.000010655851,0.00005064226,0.00007597404,0.000004150825,0.000008765824,0.00035411108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994187,7.6753395e-7,0.00027452176,0.00006965495,0.00014229653,0.00009410091],"domain_scores_gemma":[0.999602,0.0000048053016,0.00013635788,0.0000770686,0.00016396811,0.000015763151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012993494,0.000077396035,0.000095665935,0.0000747884,0.00004160422,0.000038310212,0.000109803346,0.000048836726,0.000008979469],"category_scores_gemma":[0.000008040617,0.000060516297,0.00005285223,0.00013076082,0.000022409979,0.00044268963,0.000020348289,0.000052302275,0.00001700936],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008423371,0.000013695401,0.008726869,0.006696074,0.00023084083,2.0210426e-7,0.0010461889,0.00069595774,0.036915805,0.8082083,0.007968899,0.12941298],"study_design_scores_gemma":[0.003867077,0.0002235198,0.012361603,0.0017883059,0.0003900327,0.0015167228,0.036477245,0.059663925,0.5806248,0.016381202,0.28555414,0.0011513755],"about_ca_topic_score_codex":0.0000032417524,"about_ca_topic_score_gemma":2.0676009e-7,"teacher_disagreement_score":0.7918271,"about_ca_system_score_codex":0.00007116066,"about_ca_system_score_gemma":0.000005202685,"threshold_uncertainty_score":0.2467783},"labels":[],"label_agreement":null},{"id":"W2953985905","doi":"10.29173/mocs75","title":"Smart Construction Site: Ontology of Information System Architecture","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architecture; Ontology; Process (computing); Task (project management); Information system; Systems engineering; Software engineering; Engineering","score_opus":0.002756303758788829,"score_gpt":0.15644658311729176,"score_spread":0.15369027935850293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953985905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9670457,0.00018653285,0.01961693,0.000053414,0.0017265078,0.00040700624,0.00003638077,0.00042987982,0.010497639],"genre_scores_gemma":[0.9917822,0.000048841655,0.007896114,0.000025384155,0.000102804064,0.000023680077,0.000043599888,0.000021203596,0.000056157318],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986479,0.000013762622,0.00057949196,0.00025415534,0.00024774758,0.00025690848],"domain_scores_gemma":[0.999197,0.00001570979,0.00021365925,0.00014487538,0.00032997484,0.00009878705],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014200811,0.00027232085,0.00038046626,0.0004512984,0.000111330555,0.00009938294,0.000096582735,0.00030535008,0.00008701988],"category_scores_gemma":[0.000015451904,0.0002740544,0.00009938936,0.00037072692,0.00021808241,0.0009165328,0.000028466704,0.00030252954,0.000054645603],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025541993,0.00002034482,0.32568035,0.0032666766,0.00031472056,0.0000015827312,0.0020442784,0.0019959868,0.04153146,0.21132278,0.000627171,0.41293925],"study_design_scores_gemma":[0.015558425,0.0014889344,0.1310674,0.0028953485,0.0011584737,0.009417319,0.05919371,0.3311481,0.19343904,0.009057165,0.23974667,0.0058294428],"about_ca_topic_score_codex":0.000033565368,"about_ca_topic_score_gemma":0.00001183886,"teacher_disagreement_score":0.4071098,"about_ca_system_score_codex":0.00010137696,"about_ca_system_score_gemma":0.000026982632,"threshold_uncertainty_score":0.99997115},"labels":[],"label_agreement":null},{"id":"W2954089627","doi":"10.29173/mocs104","title":"An Efficiency-orientated Total Factor Productivity Measurement Model for Construction Projects","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Productivity; Risk analysis (engineering); Engineering; Computer science; Systems engineering; Manufacturing engineering; Business; Economics","score_opus":0.015141659327271514,"score_gpt":0.20590774227763148,"score_spread":0.19076608295035996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954089627","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8959602,0.00013503921,0.099837154,0.00003957561,0.0015472316,0.0013213813,0.00005361251,0.0005647045,0.0005410957],"genre_scores_gemma":[0.98798543,0.000027296841,0.011426227,0.000013964395,0.00021243624,0.0001437905,0.0000314691,0.00005298012,0.00010637592],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99794894,0.000013576162,0.00044043222,0.0007093029,0.00046557988,0.00042215746],"domain_scores_gemma":[0.9987302,0.0000087650715,0.00013947835,0.00020122742,0.0007514812,0.00016885498],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026396566,0.00038893675,0.00035688808,0.00028423002,0.00026850394,0.00022690037,0.00011551566,0.0002376325,0.000042538977],"category_scores_gemma":[0.00003471025,0.0003933055,0.000096168566,0.00033866664,0.00020153572,0.0012552099,0.000021713078,0.0002613486,0.000011314458],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034854782,0.00016386178,0.04593423,0.0011209573,0.0002347445,7.290903e-7,0.002194157,0.01403794,0.66608083,0.02182902,0.00034016182,0.24771485],"study_design_scores_gemma":[0.0016936365,0.00032559712,0.0030760563,0.00010203541,0.00009769759,0.0001673427,0.0020296676,0.87094367,0.11832081,0.0010894638,0.0013255979,0.0008284349],"about_ca_topic_score_codex":0.00001237623,"about_ca_topic_score_gemma":0.000011178264,"teacher_disagreement_score":0.8569057,"about_ca_system_score_codex":0.00021986147,"about_ca_system_score_gemma":0.00008053401,"threshold_uncertainty_score":0.9998519},"labels":[],"label_agreement":null},{"id":"W2954092237","doi":"10.29173/mocs135","title":"Bridging the Gap between Academic and Practice Quantity Surveying in Nigerian Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Openness to experience; Bridging (networking); Bridge (graph theory); Curriculum; Body of knowledge; Knowledge management; Public relations; Medical education; Psychology; Sociology; Political science; Pedagogy; Computer science; Medicine; Social psychology","score_opus":0.01882426593830691,"score_gpt":0.2410966352264226,"score_spread":0.2222723692881157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954092237","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99319184,0.0005975734,0.0022908638,0.000538002,0.00085441524,0.00039066057,0.000015023362,0.00021270379,0.0019089169],"genre_scores_gemma":[0.99752706,0.0004043079,0.0015713235,0.0000828514,0.0003085848,0.000019677484,0.000012564367,0.000033078708,0.000040531195],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99839544,0.000060625265,0.00050277147,0.00043771337,0.0002617336,0.00034170153],"domain_scores_gemma":[0.99931777,0.00011948191,0.00017494193,0.00013185164,0.0001411641,0.00011481092],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00073729485,0.0002883359,0.00032630074,0.00029419406,0.00024643863,0.0002491114,0.000120824436,0.00053500984,0.000031954958],"category_scores_gemma":[0.00015192745,0.00026978704,0.000048609778,0.0005210401,0.0003179149,0.0014577841,0.000056763707,0.001359557,0.000010763892],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035893736,0.0000044384383,0.8803778,0.00013035591,0.000058505546,0.000001136061,0.00043376413,0.00011719191,0.011388418,0.007478408,0.00008567967,0.09988841],"study_design_scores_gemma":[0.00420894,0.00018662681,0.85562104,0.0010261785,0.00038149746,0.0025973725,0.034044918,0.05580814,0.020678315,0.003899984,0.019156622,0.0023903688],"about_ca_topic_score_codex":0.00012512699,"about_ca_topic_score_gemma":0.000028220347,"teacher_disagreement_score":0.09749804,"about_ca_system_score_codex":0.000083624866,"about_ca_system_score_gemma":0.000032565353,"threshold_uncertainty_score":0.99997544},"labels":[],"label_agreement":null},{"id":"W2954104000","doi":"10.22260/isarc2019/0095","title":"Ontology-Based Knowledge Modeling for Frame Assemblies Manufacturing","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ontology; Computer science; Frame (networking); Modular design; Product (mathematics); Automation; Manufacturing engineering; Information model; Building information modeling; Process (computing); Download; Software engineering; Knowledge modeling; Engineering; World Wide Web; Domain knowledge; Operations management; Mechanical engineering","score_opus":0.012929366064684667,"score_gpt":0.21883262166325246,"score_spread":0.20590325559856779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954104000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9755205,0.00014058982,0.004476278,0.00014593871,0.0006676551,0.0002736286,0.0000039202573,0.00014355237,0.018627934],"genre_scores_gemma":[0.9971695,0.0000035099733,0.0024140875,0.000023437859,0.000069250375,0.000034719335,8.437806e-7,0.00001929575,0.00026538275],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994999,0.0000011797894,0.00016416934,0.0001118684,0.000076820805,0.00014603957],"domain_scores_gemma":[0.99973077,0.000026218315,0.000042435837,0.00006799852,0.00011261714,0.000019959949],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008922236,0.000102929276,0.00013352,0.0000694694,0.00004731918,0.000027034166,0.00018503034,0.00009016021,0.000021804537],"category_scores_gemma":[0.000019262541,0.000078847974,0.00009471036,0.00006280175,0.000021601849,0.00013581886,0.000019656238,0.00012339102,0.0000123739255],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020801746,0.00012730998,0.017418176,0.0047979397,0.0003322006,6.503808e-8,0.003382365,0.12676752,0.654813,0.13453966,0.007382717,0.050231032],"study_design_scores_gemma":[0.0003528183,0.000026677864,0.00024411042,0.00012163112,0.000023847497,0.0000026537414,0.00043118003,0.63409764,0.35485813,0.006788029,0.0029071774,0.00014610305],"about_ca_topic_score_codex":0.0000044180138,"about_ca_topic_score_gemma":0.0000036987444,"teacher_disagreement_score":0.5073301,"about_ca_system_score_codex":0.000038556864,"about_ca_system_score_gemma":0.000012793244,"threshold_uncertainty_score":0.3215327},"labels":[],"label_agreement":null},{"id":"W2954113214","doi":"10.22260/isarc2019/0093","title":"Infographics on Unmanned Dozer Operation","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Infographic; Download; Computer science; Displacement (psychology); World Wide Web; Multimedia","score_opus":0.004343861119126034,"score_gpt":0.1732408418434384,"score_spread":0.16889698072431236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954113214","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9217773,0.000023181146,0.000018862795,0.00029482332,0.00055172516,0.00015340697,0.0000017427257,0.00008956408,0.07708936],"genre_scores_gemma":[0.9992223,0.000015788062,0.00011552337,0.00009711097,0.000050818413,0.000008491981,7.6354553e-7,0.000010991101,0.00047824899],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99958134,0.0000011506145,0.00012583178,0.000073420306,0.00013693576,0.000081298385],"domain_scores_gemma":[0.9997961,0.0000075397033,0.00003284556,0.00006260651,0.00008511971,0.000015779047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000064588436,0.00007363409,0.00007194612,0.00006455003,0.000032923046,0.0000301957,0.00012863301,0.000057959274,0.00006174356],"category_scores_gemma":[0.000011278831,0.000052075266,0.000050515006,0.00017109717,0.000025534418,0.00016571365,0.000014559419,0.00012009872,0.00005236173],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005996508,0.000043241387,0.046507396,0.000317514,0.00009857042,4.251772e-8,0.0014469643,0.0034302128,0.40056401,0.51546377,0.015707778,0.016360562],"study_design_scores_gemma":[0.00130013,0.000274852,0.03298627,0.00039506482,0.00005998108,0.000019252548,0.0017100148,0.039448675,0.8547002,0.01475002,0.053721625,0.00063389214],"about_ca_topic_score_codex":0.0000030618965,"about_ca_topic_score_gemma":0.0000010356345,"teacher_disagreement_score":0.5007137,"about_ca_system_score_codex":0.0000181149,"about_ca_system_score_gemma":0.000004805085,"threshold_uncertainty_score":0.21235676},"labels":[],"label_agreement":null},{"id":"W2954309327","doi":"10.29173/mocs108","title":"A Case Study for 3D Modeling Process Analysis based on BIM Log File","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Building information modeling; Framing (construction); Process (computing); Chart; Data file; Reading (process); Engineering drawing; Database; Software engineering; Programming language; Engineering","score_opus":0.010602408505400186,"score_gpt":0.21795297551684306,"score_spread":0.2073505670114429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954309327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92700756,0.000043471446,0.07060804,0.000017920824,0.00034262432,0.00082101056,0.00010050244,0.00031428362,0.000744578],"genre_scores_gemma":[0.9935772,0.000005413733,0.005870162,0.000039070095,0.00010910069,0.00021927374,0.00006493757,0.000039433085,0.00007544211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99856544,0.00000878122,0.000388623,0.0005150465,0.0002420524,0.0002800765],"domain_scores_gemma":[0.9992432,0.000032481104,0.00008805836,0.00016089388,0.00036414605,0.000111229136],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017101863,0.00030134388,0.00038303068,0.00062559836,0.00022675363,0.00018753248,0.0000881668,0.00016608347,0.0003086459],"category_scores_gemma":[0.000023202476,0.0002966186,0.00015345591,0.00078630704,0.000050391187,0.00040255842,0.000013227546,0.00021805371,0.000011414589],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044298486,0.00036129047,0.23317856,0.0013137292,0.0019305989,0.000066513545,0.0021953955,0.61582756,0.0014780805,0.0028100375,0.00062947255,0.13976578],"study_design_scores_gemma":[0.001003914,0.00018511381,0.00020808577,0.00003869772,0.0003975548,0.00014746543,0.005923404,0.99084914,0.000349482,0.0001695344,0.00037902055,0.00034861136],"about_ca_topic_score_codex":0.000039167284,"about_ca_topic_score_gemma":0.000041301748,"teacher_disagreement_score":0.37502155,"about_ca_system_score_codex":0.00006757568,"about_ca_system_score_gemma":0.000025525964,"threshold_uncertainty_score":0.9999486},"labels":[],"label_agreement":null},{"id":"W2954311262","doi":"10.29173/mocs137","title":"Site-specific Modular Design Optimization for High-rise Residential Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Set (abstract data type); Genetic algorithm; Plan (archaeology); Computer science; Building design; Daylighting; Efficient energy use; Page layout; Reliability engineering; Engineering; Architectural engineering","score_opus":0.007363822194697756,"score_gpt":0.17986035166124598,"score_spread":0.17249652946654823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954311262","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5578787,0.0005665271,0.43855366,0.00007245319,0.0013485852,0.0007470724,0.00002331248,0.00041963748,0.00039006028],"genre_scores_gemma":[0.87633663,0.00047011796,0.12203617,0.00003320004,0.00043209887,0.00011252291,0.00006309557,0.00008614066,0.00043000767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99825734,0.000014163568,0.00048692516,0.000575697,0.00028542228,0.00038047062],"domain_scores_gemma":[0.9991126,0.00003139204,0.000138411,0.00017058886,0.00040845358,0.00013854222],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002449323,0.00036183084,0.0003584606,0.00036526547,0.00026069765,0.00035695193,0.00013910918,0.00031099483,0.00033289404],"category_scores_gemma":[0.000022715756,0.00039425417,0.00011673424,0.00035390083,0.00013255909,0.00086129195,0.00003252044,0.00023903328,0.00004907489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00084655796,0.0000876615,0.018928677,0.001187923,0.00042046144,0.0000052204537,0.000996624,0.3593579,0.34146902,0.107331306,0.01801167,0.151357],"study_design_scores_gemma":[0.0041311323,0.00033237375,0.0014767334,0.00025473683,0.00022407627,0.00015778631,0.0011023391,0.8335941,0.098197035,0.0055666533,0.053428903,0.0015341366],"about_ca_topic_score_codex":0.000015914424,"about_ca_topic_score_gemma":0.0000028224895,"teacher_disagreement_score":0.4742362,"about_ca_system_score_codex":0.00011789824,"about_ca_system_score_gemma":0.00002139402,"threshold_uncertainty_score":0.9998509},"labels":[],"label_agreement":null},{"id":"W2954585279","doi":"10.22260/isarc2019/0018","title":"Multi-objective Optimization Analysis for Selective Disassembly Planning of Buildings","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.009301348081987248,"score_gpt":0.2259789398981037,"score_spread":0.21667759181611645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954585279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9273279,0.00006371203,0.06780121,0.000027826609,0.00021051097,0.00043521338,0.000016884493,0.00007470876,0.004042048],"genre_scores_gemma":[0.9820481,0.000004201589,0.017763715,0.0000055743594,0.000023485141,0.000027855613,0.000002507599,0.000015304979,0.000109277964],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994268,0.0000021298329,0.0002090889,0.00013075028,0.00011922809,0.00011202969],"domain_scores_gemma":[0.9993785,0.000035942325,0.00014669426,0.000054045802,0.00036767614,0.00001713161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010568255,0.00009913648,0.00020302786,0.00016774099,0.000039008675,0.0000160667,0.00014257802,0.000066858454,0.00000792894],"category_scores_gemma":[0.000054807064,0.00007902739,0.00015289082,0.00067073194,0.000031745203,0.00020263274,0.000019841622,0.00007581078,6.014009e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087225635,0.000039401944,0.163391,0.00030277987,0.0010349321,9.402019e-9,0.0041704304,0.5078259,0.31735763,0.004505534,0.0003657422,0.00091937225],"study_design_scores_gemma":[0.00052220805,0.00006451594,0.018575931,0.00009222223,0.0003696295,0.0000016791654,0.0020144698,0.546016,0.43171388,0.00038735653,0.00006972604,0.0001723891],"about_ca_topic_score_codex":0.0000129114105,"about_ca_topic_score_gemma":0.0000014538072,"teacher_disagreement_score":0.14481506,"about_ca_system_score_codex":0.00005317772,"about_ca_system_score_gemma":0.000009717844,"threshold_uncertainty_score":0.32226434},"labels":[],"label_agreement":null},{"id":"W2954660414","doi":"10.29173/mocs102","title":"Logistics Strategy for Industrialised House Building","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Government","keywords":"Supply chain; Flexibility (engineering); Product (mathematics); Process management; Integrated logistics support; Business; Standardization; Order (exchange); Process (computing); Usability; Modularity (biology); Computer science; Manufacturing engineering; Marketing; Engineering; Economics","score_opus":0.017378192125625427,"score_gpt":0.21797561409648544,"score_spread":0.20059742197086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954660414","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9431897,0.0002679415,0.051113524,0.000060864062,0.0018107002,0.0006637155,0.000039479575,0.00072963804,0.002124435],"genre_scores_gemma":[0.99245125,0.00009800001,0.0066739027,0.000031151845,0.00038402405,0.0000483145,0.000015797108,0.000059488837,0.00023805803],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988156,0.0000056819604,0.00036073275,0.00034690177,0.00016811104,0.00030296738],"domain_scores_gemma":[0.99942034,0.000026608253,0.00009478609,0.00010882951,0.00023525365,0.00011415489],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014594066,0.0002595575,0.00028298443,0.0002083144,0.00014750834,0.0002414859,0.000103342914,0.0003007298,0.00007077516],"category_scores_gemma":[0.00003397166,0.000268895,0.00008831977,0.00024471214,0.00011854836,0.00047895513,0.00002036624,0.00026273058,0.000016816013],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030190876,0.000051004055,0.061775073,0.00089861127,0.00047056496,0.0000024334684,0.00043481932,0.011164867,0.1294353,0.33391404,0.0065261535,0.45502523],"study_design_scores_gemma":[0.013021388,0.0009697225,0.0066655576,0.00064363884,0.00078568223,0.00039285465,0.009696762,0.54144585,0.1465089,0.030431855,0.24556133,0.0038764486],"about_ca_topic_score_codex":0.000011067532,"about_ca_topic_score_gemma":0.0000041282005,"teacher_disagreement_score":0.530281,"about_ca_system_score_codex":0.00007630432,"about_ca_system_score_gemma":0.000028016942,"threshold_uncertainty_score":0.99997634},"labels":[],"label_agreement":null},{"id":"W2954735062","doi":"10.29173/mocs98","title":"Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"University of Technology Sydney","keywords":"Productivity; Construction industry; Process (computing); Building industry; Engineering; Operations management; Business; Environmental resource management; Architectural engineering; Computer science; Environmental science; Construction engineering; Economics","score_opus":0.005849767701162874,"score_gpt":0.1888075885468773,"score_spread":0.1829578208457144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954735062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9929975,0.000073049116,0.00051162415,0.000093450595,0.0008149711,0.0006280038,0.000014025161,0.00012173166,0.004745642],"genre_scores_gemma":[0.9984579,0.000075896,0.0008485216,0.000008759462,0.00018012105,0.0000639768,0.000010960721,0.000030419029,0.00032343567],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986925,0.000020338097,0.00037398096,0.00039595313,0.00027899316,0.00023820535],"domain_scores_gemma":[0.99948287,0.00001897336,0.00015452821,0.00016755432,0.00013021652,0.00004583612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021543785,0.00024847104,0.00027041635,0.0003105014,0.00013207838,0.0000870087,0.000090185255,0.00015809137,0.000048320624],"category_scores_gemma":[0.000014945741,0.00022301296,0.00006713027,0.0004889503,0.00022135438,0.0009038297,0.000019620053,0.00036520147,0.000011215457],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018422108,0.000030238827,0.07484989,0.0005330432,0.000076951095,0.0000010070952,0.0015450347,0.021195464,0.8620916,0.010730572,0.000086453314,0.028675519],"study_design_scores_gemma":[0.0026047523,0.00028645614,0.12174908,0.00076974684,0.0001093471,0.0002804029,0.009595711,0.104518436,0.7517387,0.0046357554,0.0023741927,0.0013374066],"about_ca_topic_score_codex":0.000042762967,"about_ca_topic_score_gemma":0.000017983555,"teacher_disagreement_score":0.11035289,"about_ca_system_score_codex":0.00015306479,"about_ca_system_score_gemma":0.000026254165,"threshold_uncertainty_score":0.90942043},"labels":[],"label_agreement":null},{"id":"W2954838440","doi":"10.22260/isarc2019/0081","title":"Development of the Simulator for Carrying a Lifted Load in Large Plant Construction","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Animation; Computer science; Virtual reality; Simulation; Work (physics); Physics engine; Computer graphics (images); Human–computer interaction; Engineering; Mechanical engineering","score_opus":0.007546639378918208,"score_gpt":0.1931979601850155,"score_spread":0.1856513208060973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954838440","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9975216,0.000034942033,0.0001124662,0.00003946812,0.0004884394,0.0003505127,0.000013114974,0.000025689278,0.0014137845],"genre_scores_gemma":[0.9980336,0.000001889416,0.0018558329,0.000009700476,0.00002058406,0.000020220985,6.87892e-7,0.000009458308,0.00004803038],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99941283,0.0000015437055,0.0002457964,0.00008031188,0.00014553033,0.000113961316],"domain_scores_gemma":[0.99970883,0.000016103992,0.00009150239,0.000054948097,0.000116833486,0.000011760188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014381723,0.00007555359,0.00011666781,0.000041540683,0.000039078943,0.0000090303665,0.00014150262,0.000056780835,0.000011257685],"category_scores_gemma":[0.000034842473,0.000049236416,0.00005376836,0.00016385509,0.000026201447,0.00008104665,0.000031536547,0.00009095909,0.0000013531594],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017240895,0.00005424783,0.28877246,0.0014417821,0.00014055368,2.6206056e-8,0.010609281,0.0016089065,0.63541025,0.04621051,0.0005134473,0.015066108],"study_design_scores_gemma":[0.0019149907,0.000030879633,0.028735457,0.0007681973,0.000037010937,0.000015403637,0.0058890237,0.057711586,0.8902233,0.0019449362,0.012429312,0.00029990412],"about_ca_topic_score_codex":0.000004355399,"about_ca_topic_score_gemma":0.000013753121,"teacher_disagreement_score":0.260037,"about_ca_system_score_codex":0.000083019935,"about_ca_system_score_gemma":0.000044866585,"threshold_uncertainty_score":0.20078027},"labels":[],"label_agreement":null},{"id":"W2954867402","doi":"10.22260/isarc2019/0148","title":"Implementing Collaborative Learning Platforms in Construction Management Education","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Class (philosophy); Engineering management; Project management; Construction management; Knowledge management; Computer science; Engineering; Systems engineering; Operations management","score_opus":0.0029069471526231355,"score_gpt":0.19495141145767103,"score_spread":0.1920444643050479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954867402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8958355,0.00004693025,0.000033044606,0.00004047122,0.00047924687,0.0002809669,0.0000010520398,0.000048804068,0.10323399],"genre_scores_gemma":[0.9978874,0.000032108026,0.0014776975,0.000009437124,0.000031622403,0.000030506944,0.0000020877428,0.000010205311,0.0005189662],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994352,0.0000015048212,0.00020192651,0.0000974907,0.00012310075,0.0001407989],"domain_scores_gemma":[0.9997488,0.0000062093027,0.0000869189,0.000040250412,0.00010461132,0.00001317725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001406858,0.00007909873,0.00008753096,0.00011673755,0.000050214163,0.000029097804,0.00009742944,0.000037595593,0.00007051049],"category_scores_gemma":[0.000008376313,0.00006421445,0.000027669761,0.00039665078,0.000024897834,0.00027163682,0.00003748286,0.00013879135,0.0000110010005],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027199301,0.00003117618,0.39869595,0.0005723816,0.000075877215,4.4133074e-8,0.0026649188,0.0012779013,0.039877508,0.3730188,0.00082116184,0.1829371],"study_design_scores_gemma":[0.0035708568,0.00021308093,0.15888497,0.0020221302,0.0001518433,0.00007733144,0.27677268,0.0337812,0.34584975,0.07675028,0.10050646,0.001419418],"about_ca_topic_score_codex":0.000008318273,"about_ca_topic_score_gemma":0.0000060369975,"teacher_disagreement_score":0.30597225,"about_ca_system_score_codex":0.0000829108,"about_ca_system_score_gemma":0.000015812693,"threshold_uncertainty_score":0.26185894},"labels":[],"label_agreement":null},{"id":"W2954892287","doi":"10.29173/mocs119","title":"Strategies for a Safe Integration of Water-Bearing MEP Systems in Prefabricated CLT Room Modules","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Österreichische Forschungsförderungsgesellschaft","keywords":"Prefabrication; Piping; Modular design; Engineering; Bearing (navigation); Routing (electronic design automation); Architectural engineering; Civil engineering; Construction engineering; Computer science; Mechanical engineering; Embedded system","score_opus":0.009056262430301934,"score_gpt":0.19679581105613472,"score_spread":0.18773954862583278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954892287","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96893704,0.0004114801,0.027176097,0.000027331293,0.0007097134,0.00067747576,0.000017116894,0.00017583423,0.0018679328],"genre_scores_gemma":[0.9969795,0.00008199633,0.0025746534,0.0000048150555,0.000077891134,0.00009515212,0.00004098605,0.000031083495,0.00011395374],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868715,0.00001038842,0.00053703267,0.00032603025,0.00017376049,0.00026561413],"domain_scores_gemma":[0.99943495,0.000016735763,0.00010299963,0.00010884619,0.0002795731,0.0000568682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019735625,0.00024225922,0.0003616854,0.00037133278,0.00007152316,0.00018430622,0.00009809664,0.00021163275,0.000021649243],"category_scores_gemma":[0.0000103225,0.00021202416,0.00007516724,0.00024345874,0.00007559977,0.000881473,0.000021487058,0.00019046884,0.000006307857],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016761787,0.000037591257,0.024970531,0.0015249233,0.00013886744,5.9605645e-7,0.0017388423,0.012061592,0.7842781,0.11080259,0.00015921306,0.06411952],"study_design_scores_gemma":[0.0024561712,0.00025955,0.008726146,0.0007183394,0.00010463337,0.000085375155,0.02248506,0.73948455,0.21309994,0.0066681746,0.005051339,0.00086073193],"about_ca_topic_score_codex":0.00011767206,"about_ca_topic_score_gemma":0.000039239498,"teacher_disagreement_score":0.72742295,"about_ca_system_score_codex":0.000086706896,"about_ca_system_score_gemma":0.000018545952,"threshold_uncertainty_score":0.8646094},"labels":[],"label_agreement":null},{"id":"W2954896328","doi":"10.29173/mocs82","title":"A Knowledge-Based Approach Towards Automated Manufacturing-Centric BIM: Wood Frame Design and Modelling for Light-Frame Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Framing (construction); Modular design; Frame (networking); Field (mathematics); Engineering; Modular construction; Construction engineering; Systems engineering; Construction industry; Computer science; Context (archaeology); Architectural engineering; Best practice; Software engineering; Civil engineering; Compatibility (geochemistry); Mechanical engineering","score_opus":0.011602531409594576,"score_gpt":0.2007306233714876,"score_spread":0.189128091961893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954896328","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53024346,0.00067480514,0.46639612,0.000053360964,0.0004578924,0.0007697468,0.000012810769,0.0009158415,0.00047597475],"genre_scores_gemma":[0.8873451,0.0001183638,0.112044394,0.000034440287,0.00014681679,0.00013054544,0.000022905651,0.000073634605,0.000083811254],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99813014,0.00001518725,0.00046094315,0.00066093594,0.00022288664,0.00050992746],"domain_scores_gemma":[0.9992164,0.000038497332,0.00013058934,0.00015503202,0.00026337692,0.00019613068],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028292634,0.00045531287,0.0004595704,0.00040495442,0.00026770486,0.00036702276,0.00014583561,0.00042414217,0.000021830347],"category_scores_gemma":[0.000016151165,0.00045183135,0.0001226719,0.0003628515,0.00011699254,0.0005853964,0.000039733986,0.0003529665,0.000010902728],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010127611,0.00038606877,0.01058195,0.008269361,0.0012016345,0.0000045204315,0.004699254,0.4195333,0.055626944,0.05221533,0.003003547,0.44346532],"study_design_scores_gemma":[0.0014965632,0.00010258886,0.000116672105,0.00013051796,0.00009106127,0.00006568935,0.00070341467,0.9499502,0.037570372,0.0010090439,0.008224588,0.000539295],"about_ca_topic_score_codex":0.000012104387,"about_ca_topic_score_gemma":7.164478e-7,"teacher_disagreement_score":0.53041685,"about_ca_system_score_codex":0.000121218196,"about_ca_system_score_gemma":0.00004226273,"threshold_uncertainty_score":0.99979335},"labels":[],"label_agreement":null},{"id":"W2954899194","doi":"10.29173/mocs79","title":"Applying Virtual Reality to Improve the Construction Logistics of High-rise Modular Integrated Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Plan (archaeology); Virtual reality; Construction management; Modular construction; Construction engineering; Unit (ring theory); Engineering; Computer science; Architectural engineering; Transport engineering; Engineering management; Operations research; Operations management; Civil engineering; Artificial intelligence","score_opus":0.007034569385863198,"score_gpt":0.1939025671253843,"score_spread":0.18686799773952112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954899194","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.886276,0.00017543262,0.10687213,0.00018045705,0.0032865005,0.0013645536,0.00013003622,0.00043230897,0.0012825977],"genre_scores_gemma":[0.98797065,0.00017034807,0.011122474,0.000058130365,0.00027656613,0.00017077285,0.000049630693,0.000058831334,0.00012258209],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974617,0.00004169262,0.00089900236,0.00067429495,0.0004764542,0.00044687567],"domain_scores_gemma":[0.998333,0.000053829375,0.00031679496,0.0003578818,0.0007364953,0.00020202219],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039604865,0.0005001133,0.0006033227,0.00041170168,0.0003007824,0.00021588906,0.00024702543,0.0004008887,0.00012037804],"category_scores_gemma":[0.00009213438,0.00043649462,0.00015418425,0.0008469821,0.000724052,0.0006578338,0.00008525751,0.00060396665,0.000034414632],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031778184,0.0000454878,0.0254717,0.00047573363,0.00037320744,0.000002101692,0.0005550838,0.011182454,0.15421304,0.21995014,0.0006777253,0.58673555],"study_design_scores_gemma":[0.00911715,0.0018246041,0.021385347,0.0013088237,0.0013681749,0.0019114712,0.05108123,0.4209106,0.346893,0.036578998,0.1024981,0.005122488],"about_ca_topic_score_codex":0.00019440574,"about_ca_topic_score_gemma":0.0000281365,"teacher_disagreement_score":0.58161306,"about_ca_system_score_codex":0.0001965062,"about_ca_system_score_gemma":0.00006487349,"threshold_uncertainty_score":0.99980867},"labels":[],"label_agreement":null},{"id":"W2955074025","doi":"10.29173/mocs109","title":"Assessing the Environmental Implications of Industrialized Housing: a Systematic Literature Review","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Environmental impact assessment; Prefabrication; Life-cycle assessment; Process (computing); Systematic review; Engineering; Business; Risk analysis (engineering); Architectural engineering; Operations management; Computer science; Civil engineering; Production (economics); Economics; Political science","score_opus":0.0095084233190437,"score_gpt":0.21796512665666148,"score_spread":0.2084567033376178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955074025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95820755,0.035414416,0.0016600749,0.00034912818,0.0007327512,0.0014855029,0.000028413158,0.00020044517,0.0019217145],"genre_scores_gemma":[0.99282545,0.0060483087,0.00077088765,0.000084469844,0.00008193045,0.000065814325,0.000022076458,0.00002387305,0.00007718599],"study_design_codex":"bench_or_experimental","study_design_gemma":"systematic_review","domain_scores_codex":[0.9989184,0.000024192455,0.0004933764,0.00022327054,0.0001875106,0.00015325118],"domain_scores_gemma":[0.9994496,0.000027446422,0.00020419109,0.00017345896,0.000091419344,0.00005386329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024230605,0.00019778572,0.00037080154,0.000119964236,0.00013547362,0.00020911428,0.00011711054,0.00015296935,0.00005881119],"category_scores_gemma":[0.00002644446,0.00014915185,0.00010161094,0.00036449562,0.00012384546,0.00061295775,0.00002577162,0.00026350826,0.000008731268],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064393316,0.00014762572,0.21394528,0.20380735,0.0012746355,0.0000037184318,0.002645884,0.0002775739,0.29284558,0.076529816,0.0047366004,0.20372155],"study_design_scores_gemma":[0.01671621,0.0008148814,0.1314777,0.49226922,0.007820749,0.007000159,0.04057505,0.09480382,0.10847439,0.011018948,0.080380715,0.008648177],"about_ca_topic_score_codex":0.000001582186,"about_ca_topic_score_gemma":5.785143e-7,"teacher_disagreement_score":0.28846186,"about_ca_system_score_codex":0.000058233272,"about_ca_system_score_gemma":0.000014569876,"threshold_uncertainty_score":0.6082236},"labels":[],"label_agreement":null},{"id":"W2955122893","doi":"10.22260/isarc2019/0079","title":"Information Exchange Process for AR based Smart Facility Maintenance System Using BIM Model","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Data exchange; Computer science; Information system; Process (computing); Information exchange; Information model; Systems engineering; Augmented reality; Field (mathematics); Software engineering; Database; Engineering; Human–computer interaction; Operating system","score_opus":0.015807402177863698,"score_gpt":0.20862227696018873,"score_spread":0.19281487478232504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955122893","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9476724,0.00002200822,0.045597382,0.00006283863,0.0004090469,0.00075811805,0.00008480829,0.00017904288,0.0052143205],"genre_scores_gemma":[0.99860543,0.0000011357471,0.0012192372,0.000026699772,0.000020896807,0.000060782204,0.00000388953,0.000008662347,0.000053239313],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937093,0.0000013204677,0.0002402944,0.000077591394,0.0001598775,0.00015000922],"domain_scores_gemma":[0.99942,0.0000083363875,0.000111787165,0.000076673554,0.00035921714,0.000023977896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001657033,0.00011148824,0.00013611114,0.0000671542,0.000055363806,0.000034518085,0.00016145041,0.00007244264,0.000006576177],"category_scores_gemma":[0.000025599522,0.000082330866,0.000073428964,0.0001563744,0.000025849693,0.0006056802,0.0000144113255,0.00008204206,0.000007118704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007059812,0.00010824951,0.03544149,0.072256885,0.00027203324,5.6531647e-8,0.012421115,0.51328164,0.20807941,0.11995939,0.0050984663,0.0323753],"study_design_scores_gemma":[0.00029819168,0.000011824099,0.0001008182,0.00019756967,0.000015394291,0.0000030342017,0.0013251108,0.96612954,0.030778168,0.00054656813,0.0004909402,0.00010284968],"about_ca_topic_score_codex":0.000007287103,"about_ca_topic_score_gemma":7.988938e-7,"teacher_disagreement_score":0.4528479,"about_ca_system_score_codex":0.00011133104,"about_ca_system_score_gemma":0.000026299978,"threshold_uncertainty_score":0.33573553},"labels":[],"label_agreement":null},{"id":"W2955171787","doi":"10.29173/mocs92","title":"The Value Proposition of RFID Technology in Tall Prefabricated Timber Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Radio-frequency identification; Supply chain; Factory (object-oriented programming); Value proposition; Architectural engineering; Production (economics); Investment (military); Order (exchange); Engineering; Computer science; Operations management; Manufacturing engineering; Systems engineering; Business; Civil engineering; Computer security; Marketing","score_opus":0.002543184224073203,"score_gpt":0.17191218858594248,"score_spread":0.16936900436186927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955171787","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9933696,0.0004267064,0.0016669389,0.00026782494,0.00042238948,0.0004130875,0.0000046646346,0.00021926938,0.0032095232],"genre_scores_gemma":[0.99701834,0.0001968461,0.0025008821,0.000011696213,0.00003970256,0.000039238133,0.00000635344,0.00002373382,0.00016323832],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99890935,0.000008238606,0.00039230083,0.00027543656,0.00017481015,0.00023988358],"domain_scores_gemma":[0.99949557,0.000015058714,0.0001155345,0.00012320161,0.00020720733,0.000043437572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016175603,0.00018926167,0.00022553786,0.00033291316,0.00010649165,0.00007204746,0.00012756513,0.0002301902,0.000028144672],"category_scores_gemma":[0.00001921321,0.00015961633,0.000051479168,0.00064503297,0.00024859753,0.00036030824,0.00003631762,0.0002846779,0.000014161374],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012376641,0.000043058128,0.23305376,0.00041796756,0.00014256383,0.0000012498087,0.00043932683,0.001663134,0.40873632,0.24450852,0.00040166036,0.110468686],"study_design_scores_gemma":[0.0047211493,0.0005823342,0.061279736,0.0009671748,0.00021582862,0.00073327887,0.0072021564,0.21972209,0.6130172,0.04466451,0.04506153,0.0018330134],"about_ca_topic_score_codex":0.000021374104,"about_ca_topic_score_gemma":0.000009566123,"teacher_disagreement_score":0.21805896,"about_ca_system_score_codex":0.00007956333,"about_ca_system_score_gemma":0.000017811553,"threshold_uncertainty_score":0.65089655},"labels":[],"label_agreement":null},{"id":"W2955214881","doi":"10.29173/mocs113","title":"Research Trends in Off-Site Construction Management: Review of Literature at the Process Level","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Quality (philosophy); Process (computing); Excellence; Standardization; Process management; Project management; Engineering management; Business; Engineering; Operations management; Computer science; Systems engineering; Political science","score_opus":0.014465674163967854,"score_gpt":0.25808642755039835,"score_spread":0.2436207533864305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955214881","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9512599,0.022328572,0.00013702427,0.0003691789,0.00074336346,0.0007058016,0.000064511434,0.00014003372,0.024251597],"genre_scores_gemma":[0.97515935,0.020885227,0.0011427363,0.00008545182,0.0001297446,0.000106854895,0.00009561869,0.000045996658,0.0023490305],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981157,0.000036463545,0.0005500009,0.00044551247,0.0005074436,0.00034486805],"domain_scores_gemma":[0.9990559,0.000023063414,0.00013162933,0.00022038,0.00049411634,0.00007489725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006157894,0.0002653674,0.00035934942,0.00077211193,0.00017423494,0.00011291363,0.00017637634,0.00020435077,0.00033449376],"category_scores_gemma":[0.000015534722,0.00021848238,0.000101313984,0.002037621,0.0003494588,0.0006023025,0.00007057118,0.00054631324,0.00002858045],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001289186,0.00003518089,0.0715666,0.012781887,0.0001676675,0.0000052672967,0.0011349104,0.00015811383,0.004581695,0.033596575,0.004113085,0.8717301],"study_design_scores_gemma":[0.014293048,0.0008897297,0.20692375,0.08048802,0.0009893427,0.004074579,0.032338556,0.04964763,0.07066812,0.016284876,0.5177634,0.0056389607],"about_ca_topic_score_codex":0.000010725393,"about_ca_topic_score_gemma":0.000027148533,"teacher_disagreement_score":0.86609113,"about_ca_system_score_codex":0.00013162529,"about_ca_system_score_gemma":0.000015184874,"threshold_uncertainty_score":0.89094526},"labels":[],"label_agreement":null},{"id":"W2955275722","doi":"10.1016/j.jclepro.2019.07.055","title":"Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings","year":2019,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Construction waste; Engineering; Building information modeling; Roof; Construction engineering; Construction industry; Sustainable design; Automation; Civil engineering; Sustainability; Architectural engineering; Waste management; Mechanical engineering; Operations management","score_opus":0.011622136090368464,"score_gpt":0.22257785405279532,"score_spread":0.21095571796242685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955275722","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7112666,0.00032335913,0.28640833,0.00012590994,0.0010803455,0.00033866323,5.4781685e-7,0.000042598676,0.00041367035],"genre_scores_gemma":[0.96984565,0.00005137619,0.029575491,0.000004908244,0.0003310034,0.0000049282335,0.00000196519,0.000018633453,0.00016604451],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999082,0.000031730997,0.00046431462,0.00011908614,0.00016724109,0.00013558549],"domain_scores_gemma":[0.9989329,0.000030996154,0.00028794247,0.00008745647,0.0006224146,0.00003829675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005798049,0.00010715533,0.00021803963,0.00029214233,0.000063228406,0.00004327739,0.000051966363,0.00008857273,0.000014990049],"category_scores_gemma":[0.00011792579,0.00009807017,0.000053131265,0.00020341507,0.00003662964,0.00081895344,0.000008088991,0.00016572882,4.056977e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005682281,0.00003116518,0.003805815,0.00078225206,0.00019231705,0.000002196299,0.001617724,0.77667665,0.11752494,0.006514457,0.0012251113,0.091059156],"study_design_scores_gemma":[0.0047010523,0.0016687923,0.008552527,0.0010403584,0.00043496466,0.0027351032,0.01658979,0.1576303,0.74576926,0.026561901,0.0333883,0.0009276316],"about_ca_topic_score_codex":0.0000062191493,"about_ca_topic_score_gemma":2.0588118e-7,"teacher_disagreement_score":0.62824434,"about_ca_system_score_codex":0.00010191523,"about_ca_system_score_gemma":0.000058286965,"threshold_uncertainty_score":0.39991856},"labels":[],"label_agreement":null},{"id":"W2955276466","doi":"10.29173/mocs73","title":"Data Analytics of Production Cycle Time for Offsite Construction Projects","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Productivity; Context (archaeology); Production (economics); Work (physics); Duration (music); Process (computing); Factory (object-oriented programming); Product (mathematics); Analytics; Computer science; Operations research; Engineering","score_opus":0.01515735602452109,"score_gpt":0.21053213920151176,"score_spread":0.19537478317699067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955276466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9857223,0.00031833298,0.008241575,0.0001235795,0.0018190768,0.0011487531,0.0002097745,0.00039844122,0.0020181418],"genre_scores_gemma":[0.97263134,0.00020551076,0.025753742,0.000020632506,0.00043634235,0.000048230257,0.0002783447,0.000067301946,0.000558569],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980739,0.0000122266265,0.0006125581,0.00067174557,0.00030209584,0.00032751437],"domain_scores_gemma":[0.9987012,0.000025078672,0.0002530397,0.00038887726,0.0005276989,0.00010408721],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031152178,0.00033147782,0.00045482855,0.00039996445,0.00015927362,0.00012157645,0.00022564924,0.00025730123,0.0000868862],"category_scores_gemma":[0.00006855205,0.0003468257,0.000100450874,0.000533365,0.00027380782,0.0012626738,0.000072536845,0.0002395197,0.000027982307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005982571,0.00015836286,0.13969123,0.0039444393,0.0010617056,0.0000015354635,0.0009746847,0.003850946,0.31708443,0.0352418,0.010183525,0.48720908],"study_design_scores_gemma":[0.0044513387,0.00058481673,0.009549821,0.00078721525,0.0009369975,0.0007818531,0.0054927575,0.7366444,0.13891418,0.005332933,0.0942789,0.0022447952],"about_ca_topic_score_codex":0.000012258728,"about_ca_topic_score_gemma":0.000009266745,"teacher_disagreement_score":0.73279345,"about_ca_system_score_codex":0.00008156767,"about_ca_system_score_gemma":0.00005092013,"threshold_uncertainty_score":0.9998984},"labels":[],"label_agreement":null},{"id":"W2955324818","doi":"10.29173/mocs132","title":"Investigating Stakeholders' Perceptions of Feasibility and Implications of Modular Construction-Based Post-Disaster Reconstruction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Modular design; Natural disaster; Flooding (psychology); Emergency management; Construction engineering; Engineering; Civil engineering; Risk analysis (engineering); Forensic engineering; Architectural engineering; Business; Computer science; Geography; Political science","score_opus":0.018344549640802527,"score_gpt":0.2115309248818566,"score_spread":0.19318637524105406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955324818","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990792,0.00030539226,0.00625369,0.0001306519,0.0005042727,0.000595786,0.00012842413,0.00019318401,0.0010966398],"genre_scores_gemma":[0.9771186,0.00010391239,0.022548983,0.000032151416,0.000061757564,0.000032821394,0.00004152132,0.000035843757,0.000024409122],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9981391,0.000027623866,0.00080053165,0.0005149696,0.00024910553,0.00026869992],"domain_scores_gemma":[0.9984639,0.000047378133,0.000317339,0.0002599498,0.0007457317,0.00016565603],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022197702,0.00032981797,0.0004857069,0.00043288604,0.0001940155,0.00008318718,0.00011147968,0.00027589008,0.00017332309],"category_scores_gemma":[0.00005787443,0.00035517523,0.0001342204,0.00048820593,0.000927537,0.0007532663,0.00003453795,0.0003104566,0.0000045998045],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027583328,0.000026817017,0.7058808,0.00062571495,0.00008929584,8.410956e-8,0.00047877652,0.0007744992,0.19999267,0.011421381,0.000030134659,0.080652215],"study_design_scores_gemma":[0.005988375,0.0006861407,0.70222497,0.0012513086,0.00064138824,0.00092511234,0.049395237,0.14151727,0.08077831,0.013645201,0.0007908883,0.0021557782],"about_ca_topic_score_codex":0.000048075588,"about_ca_topic_score_gemma":0.00002585891,"teacher_disagreement_score":0.14074276,"about_ca_system_score_codex":0.00009718553,"about_ca_system_score_gemma":0.00006999446,"threshold_uncertainty_score":0.99989},"labels":[],"label_agreement":null},{"id":"W2955374397","doi":"10.29173/mocs100","title":"The Legacies of Manufacturing and Factories of Industrialised Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Government","keywords":"Automotive industry; Factory (object-oriented programming); Vision; Engineering; Production (economics); Manufacturing; Outsourcing; Business; Manufacturing engineering; Industrial organization; Marketing; Computer science; Economics; Sociology","score_opus":0.0058411985311016025,"score_gpt":0.17355343397249917,"score_spread":0.16771223544139757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955374397","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99596417,0.0005538598,0.00048310094,0.000048631577,0.001018662,0.00024012795,0.000016713042,0.00008837005,0.0015863725],"genre_scores_gemma":[0.99837154,0.0004885986,0.0009337459,0.000003834776,0.00008081749,0.000008599092,0.000004590045,0.000016214628,0.000092065515],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990102,0.0000096985605,0.0004151059,0.00020196791,0.00019479386,0.00016824645],"domain_scores_gemma":[0.9994494,0.00003996709,0.0001769116,0.000101320205,0.0001776157,0.000054798333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000122072,0.00018875,0.00027788364,0.000151511,0.00014874432,0.00010427545,0.00007664475,0.00017619306,0.000030496501],"category_scores_gemma":[0.000023090597,0.00015492916,0.000057755355,0.00015800973,0.00050457724,0.00049481436,0.000030297926,0.00020643343,0.000001333183],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023065235,0.000016149199,0.20163032,0.0008911258,0.00037957492,4.7075463e-7,0.0013233285,0.00020931382,0.14178373,0.1091299,0.00029092043,0.54411453],"study_design_scores_gemma":[0.0018931443,0.00016534208,0.029692283,0.0002515245,0.00013953548,0.0001677931,0.014598901,0.0036483991,0.92027175,0.004397829,0.024211116,0.00056234794],"about_ca_topic_score_codex":0.000024818502,"about_ca_topic_score_gemma":0.000007271969,"teacher_disagreement_score":0.77848804,"about_ca_system_score_codex":0.000027207838,"about_ca_system_score_gemma":0.000017542827,"threshold_uncertainty_score":0.63178277},"labels":[],"label_agreement":null},{"id":"W2955398845","doi":"10.22260/isarc2019/0025","title":"An Analysis of the Problems of BIM-Based Drawings and Implementation During the Construction Document Phase","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Phase (matter); Engineering drawing; Engineering","score_opus":0.0037889256023634875,"score_gpt":0.2280575762540272,"score_spread":0.2242686506516637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955398845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99894184,0.00003217926,0.000111819194,0.00013380854,0.0001276408,0.00033908905,0.000013473648,0.000019926018,0.00028020362],"genre_scores_gemma":[0.99969774,0.0000109505545,0.00023497673,0.000007847559,0.000013476167,0.000016039976,0.000001777645,0.000007710031,0.000009491165],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99929947,0.0000074261493,0.00029815952,0.0001030027,0.000205507,0.000086425614],"domain_scores_gemma":[0.9994678,0.000014600899,0.00023766112,0.000119476965,0.00014517037,0.000015319172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001777835,0.00008674072,0.00014931857,0.00011389827,0.00006849574,0.000025620697,0.00017234289,0.00003415955,0.000054580578],"category_scores_gemma":[0.000007043034,0.00004869349,0.00009710076,0.0005102174,0.00012323505,0.0001982543,0.0000239318,0.000078573044,2.0222384e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027588463,0.000020076735,0.23860446,0.00034273384,0.0002674479,4.1995425e-9,0.0015242898,0.0037079535,0.74114853,0.009965808,0.000012319406,0.0043787677],"study_design_scores_gemma":[0.0010092512,0.000072281866,0.090139456,0.000097440876,0.00050870347,0.0000038392895,0.0050252723,0.025734907,0.87586194,0.0013672388,0.0000712627,0.00010841525],"about_ca_topic_score_codex":0.00008197622,"about_ca_topic_score_gemma":0.000021314252,"teacher_disagreement_score":0.148465,"about_ca_system_score_codex":0.00003391026,"about_ca_system_score_gemma":0.000012295899,"threshold_uncertainty_score":0.19856629},"labels":[],"label_agreement":null},{"id":"W2955466431","doi":"10.29173/mocs112","title":"Data Analytics Application for Non-Conformance Reports in a Cabinet Manufacturing Facility","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Rework; Analytics; Computer science; Product (mathematics); Factory (object-oriented programming); Personalization; Database; Manufacturing engineering; Engineering; World Wide Web","score_opus":0.011121080700951908,"score_gpt":0.2086898818613051,"score_spread":0.1975688011603532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955466431","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9631657,0.00009428222,0.03406815,0.000040905776,0.00049477984,0.0007325101,0.000099677556,0.00015827881,0.0011457406],"genre_scores_gemma":[0.9959542,0.00007151845,0.00343535,0.000020634925,0.00008105197,0.00006670907,0.00024205618,0.000016358556,0.000112092006],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986953,0.0000024924504,0.00046326543,0.00045791196,0.00014864866,0.00023235218],"domain_scores_gemma":[0.99939543,0.0000115068215,0.00012059148,0.0002948748,0.00010945933,0.00006812038],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024051599,0.00020121844,0.0002487008,0.00020239613,0.00007681444,0.00009676344,0.00012922217,0.0001569397,0.000021073436],"category_scores_gemma":[0.000014601094,0.00021321361,0.000041438307,0.00018607418,0.00006466147,0.00083807536,0.00004736479,0.00018778504,0.000009832549],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012997737,0.000043335116,0.46374577,0.0018588516,0.0001587215,0.0000034500958,0.000465751,0.004422638,0.032281213,0.0030782628,0.0014402338,0.49237177],"study_design_scores_gemma":[0.0014996704,0.00006853985,0.045303863,0.00014575865,0.00008605924,0.0002751756,0.0014466062,0.8195993,0.034545418,0.0017564952,0.09441763,0.00085552153],"about_ca_topic_score_codex":0.000030464444,"about_ca_topic_score_gemma":0.000058617494,"teacher_disagreement_score":0.8151766,"about_ca_system_score_codex":0.00007828833,"about_ca_system_score_gemma":0.00002060306,"threshold_uncertainty_score":0.8694599},"labels":[],"label_agreement":null},{"id":"W2955467198","doi":"10.22260/isarc2019/0140","title":"Schedule Quality Assessment for nD Models using Industry Foundation Classes","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Schedule; Computer science; Quality (philosophy); Scheduling (production processes); Operations research; Software; Software engineering; Engineering; Operations management","score_opus":0.05298002145118099,"score_gpt":0.3041200264161804,"score_spread":0.25114000496499944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955467198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97721875,0.00001829421,0.009947377,0.00014164104,0.00050034124,0.00031267857,0.0000057264815,0.000066775334,0.0117884055],"genre_scores_gemma":[0.98969054,0.0000020203775,0.009962224,0.0000198701,0.00009600087,0.000020838765,0.000001783816,0.000015212976,0.00019150352],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993968,0.000002850981,0.00021767648,0.00011020285,0.00015678522,0.00011566267],"domain_scores_gemma":[0.9995796,0.000020917294,0.000099991295,0.00007056896,0.00020814667,0.00002075822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020061171,0.0000885651,0.00011998585,0.000043301727,0.000057754565,0.00005127939,0.00013116968,0.00013401307,0.000038623497],"category_scores_gemma":[0.000020123713,0.000071788745,0.00006489561,0.00012420707,0.000029151845,0.00045697743,0.000024213707,0.00019035574,0.0000018659572],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030517538,0.000046529407,0.036788065,0.0008354522,0.00011099264,7.4323996e-9,0.00037039563,0.022209208,0.5667862,0.36204806,0.0008933187,0.00988125],"study_design_scores_gemma":[0.00065356767,0.000040527168,0.005125094,0.00018425156,0.000054431224,0.0000056446147,0.002027217,0.79406446,0.13738553,0.058902875,0.001275523,0.00028088642],"about_ca_topic_score_codex":0.000011893214,"about_ca_topic_score_gemma":0.0000012079265,"teacher_disagreement_score":0.77185524,"about_ca_system_score_codex":0.0001015944,"about_ca_system_score_gemma":0.000033507487,"threshold_uncertainty_score":0.292746},"labels":[],"label_agreement":null},{"id":"W2955523957","doi":"10.22260/isarc2019/0165","title":"Case Study on Mobile Virtual Reality Construction Training","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Virtual reality; Lagging; Computer science; Craft; Download; Multimedia; Augmented reality; Mobile device; Human–computer interaction; World Wide Web","score_opus":0.0227026058004439,"score_gpt":0.2379289585506848,"score_spread":0.2152263527502409,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955523957","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97999,0.000006459531,0.000027912567,0.000021529939,0.0007307446,0.0003986034,0.0000050103263,0.00012146497,0.018698297],"genre_scores_gemma":[0.99966687,0.0000015697552,0.000077302466,0.000010400136,0.000071354974,0.000031919735,3.4411198e-7,0.000014002607,0.00012622387],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9993758,0.0000048822635,0.00020287083,0.00013569099,0.00016802197,0.00011274047],"domain_scores_gemma":[0.9997057,0.00001984603,0.000066362205,0.00009240881,0.000088957604,0.000026765832],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015869096,0.0001052667,0.00013412214,0.000057325025,0.00006153069,0.000027083513,0.00010947259,0.00005478764,0.000047872312],"category_scores_gemma":[0.000016207554,0.00008012847,0.00005609421,0.00016997752,0.000052760857,0.00015067146,0.000021017628,0.00018041379,0.000014303994],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025847874,0.00054527906,0.156992,0.00049905234,0.0006041679,0.00002139632,0.077687904,0.00996266,0.21241467,0.11518795,0.0037743351,0.4220521],"study_design_scores_gemma":[0.004069626,0.002493148,0.011343875,0.00038409504,0.0002495955,0.0067417533,0.8017986,0.02569944,0.13618605,0.005464582,0.0043091807,0.0012600988],"about_ca_topic_score_codex":0.000025717462,"about_ca_topic_score_gemma":0.000003909361,"teacher_disagreement_score":0.72411066,"about_ca_system_score_codex":0.000044807537,"about_ca_system_score_gemma":0.0000099780145,"threshold_uncertainty_score":0.32675442},"labels":[],"label_agreement":null},{"id":"W2955588086","doi":"10.29173/mocs91","title":"A Research Roadmap for Off-Site Construction: Automation and Robotics","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Robotics; Automation; Engineering management; Manufacturing engineering; Government (linguistics); Manufacturing; Engineering; Emerging technologies; Technology roadmap; Computer science; Artificial intelligence; Systems engineering; Robot; Process management; Business; Marketing","score_opus":0.012939396155194502,"score_gpt":0.236567965683315,"score_spread":0.2236285695281205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955588086","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9776852,0.0012405838,0.013998943,0.00029517073,0.0014445337,0.00094083993,0.000031875006,0.000505553,0.0038572645],"genre_scores_gemma":[0.96425,0.0006140106,0.033977285,0.00003683968,0.00037039217,0.00010273308,0.000043580916,0.000057452675,0.0005476663],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983279,0.000018769828,0.00042676958,0.0004912581,0.00033582823,0.00039947982],"domain_scores_gemma":[0.9989354,0.000054347547,0.00009238993,0.00014722763,0.0006116108,0.00015901403],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041400894,0.00027653467,0.00031847152,0.00047366825,0.0003590977,0.00034492655,0.0000904615,0.00030155986,0.000076388846],"category_scores_gemma":[0.000035417044,0.00029217987,0.00007642972,0.00046345106,0.00035493076,0.0008343839,0.00004470243,0.00037720992,0.00003409946],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017410058,0.00003363119,0.09951712,0.0013513168,0.0002390452,0.0000018250533,0.0010181899,0.0020418854,0.031566624,0.23543711,0.003184452,0.6254347],"study_design_scores_gemma":[0.0053731916,0.0006088756,0.02440376,0.00061955996,0.0002573906,0.0014780702,0.010829827,0.7804288,0.016733397,0.018244242,0.13912976,0.0018930773],"about_ca_topic_score_codex":0.000010639792,"about_ca_topic_score_gemma":0.000012283746,"teacher_disagreement_score":0.77838695,"about_ca_system_score_codex":0.0001041496,"about_ca_system_score_gemma":0.000035575165,"threshold_uncertainty_score":0.99995303},"labels":[],"label_agreement":null},{"id":"W2955620045","doi":"10.29173/mocs99","title":"Calibrating CII RT283’s Modularization Critical Success Factor Accomplishments","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Texas at Austin","keywords":"Modular programming; Modular design; Critical success factor; Computer science; Sample (material); Project management; Estimation; Operations management; Engineering; Systems engineering; Knowledge management","score_opus":0.0064484960170310135,"score_gpt":0.20363059842499423,"score_spread":0.19718210240796322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955620045","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96975565,0.00021318479,0.023167778,0.00012137336,0.0016890317,0.00033917715,0.000032277076,0.0005386997,0.0041428283],"genre_scores_gemma":[0.9954608,0.00005340438,0.0038952534,0.00006896425,0.00023286282,0.000028667935,0.000039450715,0.000049493316,0.00017110545],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839514,0.000012762533,0.00044323297,0.00046627314,0.00032391417,0.00035865637],"domain_scores_gemma":[0.99931747,0.000026050158,0.00008130305,0.00013974532,0.00027143504,0.00016396995],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009117776,0.0003181963,0.00030709183,0.00024275795,0.00023172285,0.00043829595,0.00013909384,0.00026150094,0.0003626694],"category_scores_gemma":[0.00004196951,0.00033371925,0.00008436841,0.00034544876,0.00014840033,0.0015839647,0.00005126846,0.00032585725,0.000050264567],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005348543,0.00004686287,0.6957836,0.0007964603,0.00016563085,0.000003176009,0.0006806201,0.0007533827,0.09825086,0.07902756,0.00058729615,0.12385103],"study_design_scores_gemma":[0.0039556813,0.0003040712,0.13579978,0.00075982645,0.0002631591,0.00048293106,0.0049158023,0.705738,0.11413743,0.009930849,0.020555502,0.003156953],"about_ca_topic_score_codex":0.0000170554,"about_ca_topic_score_gemma":0.0000048575353,"teacher_disagreement_score":0.7049846,"about_ca_system_score_codex":0.000087314336,"about_ca_system_score_gemma":0.00001999679,"threshold_uncertainty_score":0.9999115},"labels":[],"label_agreement":null},{"id":"W2955632512","doi":"10.22260/isarc2019/0021","title":"The Benefits of and Barriers to BIM Adoption in Canada","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Download; Stakeholder; Asset (computer security); Benchmark (surveying); Process (computing); Business; Computer science; Engineering; Public relations; Political science; World Wide Web; Operations management; Geography","score_opus":0.004210997466046068,"score_gpt":0.1643606300440972,"score_spread":0.16014963257805115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955632512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99621576,0.00011416914,0.0000018005645,0.00025567226,0.0001820248,0.000102702594,0.0000029561409,0.0000060330012,0.0031189064],"genre_scores_gemma":[0.99983263,0.000031271262,0.000052419222,0.000020403933,0.000009934854,0.0000048999887,7.540993e-8,0.0000044073527,0.000043949287],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996896,8.836037e-7,0.00010593744,0.000045877117,0.00009081654,0.000066879606],"domain_scores_gemma":[0.9998483,0.000011709085,0.000026907966,0.00003515839,0.000051863746,0.000026070336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000062926156,0.000041013398,0.000056767374,0.000024238814,0.000021097016,0.000007701733,0.000087662695,0.000017598773,0.000008132197],"category_scores_gemma":[0.00002944836,0.0000263038,0.00001081776,0.00012639562,0.000014496629,0.000052841136,0.000017343547,0.00005354332,5.369586e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064429994,0.000004854626,0.69333017,0.00035111146,0.000048090824,2.8906085e-8,0.0021684212,0.00896826,0.07876905,0.11985309,0.0033540323,0.093088485],"study_design_scores_gemma":[0.0009818226,0.00010979623,0.634166,0.00067098567,0.000037405585,0.000017905808,0.024768611,0.028139533,0.293249,0.004849721,0.012529209,0.00047999277],"about_ca_topic_score_codex":0.024721498,"about_ca_topic_score_gemma":0.061614417,"teacher_disagreement_score":0.21447997,"about_ca_system_score_codex":0.00005561495,"about_ca_system_score_gemma":0.000039548937,"threshold_uncertainty_score":0.98177296},"labels":[],"label_agreement":null},{"id":"W2955648368","doi":"10.29173/mocs129","title":"RFID-Integrated Software Platform for Construction Materials Management","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Global Positioning System; Kanban; Computer science; Systems engineering; Software; System integration; Database; Telecommunications; Engineering; Operating system","score_opus":0.005944652689611979,"score_gpt":0.1822361675474688,"score_spread":0.17629151485785682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955648368","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.944957,0.00019610967,0.046595715,0.00005116922,0.0031977925,0.0011823244,0.000116874966,0.0008586153,0.0028443858],"genre_scores_gemma":[0.9378658,0.0002759174,0.060189676,0.000068452355,0.00028868497,0.00021877693,0.00018229254,0.00008620408,0.0008241817],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983523,0.0000060211264,0.00051993615,0.00049558224,0.00023510182,0.00039106407],"domain_scores_gemma":[0.99926287,0.000018627587,0.00013609728,0.00015661107,0.00030353008,0.00012227056],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017003495,0.00038338042,0.00039268855,0.00034439363,0.00022037815,0.00029564172,0.00012771004,0.0002807282,0.0003268766],"category_scores_gemma":[0.000014350125,0.0003830897,0.000093749695,0.00031844698,0.00016100639,0.0008064077,0.000035125173,0.00018714524,0.000056274166],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035434574,0.000037950165,0.021535784,0.0021331557,0.00055121107,0.0000031368595,0.00033371098,0.0002940264,0.106746115,0.16648272,0.0032440068,0.69828385],"study_design_scores_gemma":[0.0091211805,0.00063214253,0.008869327,0.0010605528,0.0007366087,0.0010757428,0.013955648,0.022380382,0.55424196,0.026470287,0.35793558,0.0035205644],"about_ca_topic_score_codex":0.000011696592,"about_ca_topic_score_gemma":0.0000053839353,"teacher_disagreement_score":0.6947633,"about_ca_system_score_codex":0.00013781442,"about_ca_system_score_gemma":0.000018105147,"threshold_uncertainty_score":0.9998621},"labels":[],"label_agreement":null},{"id":"W2955810178","doi":"10.29173/mocs114","title":"Case Study: Off-site manufacturing of EIFS Panelized Wall Assemblies to Gain Efficiency in Construction Sequencing","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Engineering; Envelope (radar); Quality (philosophy); Control (management); Transport engineering; Manufacturing engineering; Process (computing); Architectural engineering; Civil engineering; Construction engineering; Computer science; Operating system","score_opus":0.010688073499358868,"score_gpt":0.20870563810626339,"score_spread":0.1980175646069045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955810178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995148,0.00017844596,0.0015874391,0.000023610239,0.0007542362,0.00085341244,0.000010788592,0.00024765826,0.0011963925],"genre_scores_gemma":[0.99651706,0.00006117474,0.0031740898,0.000023317689,0.00006906877,0.000043635024,0.0000064580713,0.000040093135,0.00006511051],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9979956,0.000027244563,0.0007281864,0.0005426679,0.00032620164,0.00038007696],"domain_scores_gemma":[0.9992565,0.00003272286,0.00016353132,0.00018969832,0.00021577286,0.00014180025],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034519675,0.00036346377,0.00051075296,0.0008173518,0.00013678023,0.00014530514,0.00011679355,0.00020234437,0.00007196079],"category_scores_gemma":[0.000026888056,0.000382462,0.000090491245,0.00057934,0.0001244955,0.00067135936,0.000055940385,0.00035142532,0.000019903015],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022192945,0.00011674735,0.5839232,0.00097544835,0.00022496661,0.00017170585,0.011746621,0.012078595,0.15703197,0.003839853,0.00007602857,0.2295929],"study_design_scores_gemma":[0.012968583,0.0015844445,0.04716752,0.0015998639,0.0005341466,0.018936075,0.24550693,0.23926565,0.42185685,0.0015645508,0.0046395967,0.0043757833],"about_ca_topic_score_codex":0.00033307628,"about_ca_topic_score_gemma":0.00018573557,"teacher_disagreement_score":0.53675574,"about_ca_system_score_codex":0.00022770555,"about_ca_system_score_gemma":0.000038597744,"threshold_uncertainty_score":0.99986273},"labels":[],"label_agreement":null},{"id":"W2955851017","doi":"10.29173/mocs88","title":"Lean as an Integrator of Modular Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Workflow; Lean construction; Lean project management; Factory (object-oriented programming); Process (computing); Manufacturing engineering; Lean manufacturing; Systems engineering; Engineering; Process management; Integrator; Lean laboratory; Computer science; Construction engineering; Construction industry","score_opus":0.004184313196084121,"score_gpt":0.18379407093432187,"score_spread":0.17960975773823776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955851017","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9881555,0.00028677506,0.0030083235,0.00003236539,0.0013484483,0.0003638074,0.00001701039,0.00045479924,0.006332995],"genre_scores_gemma":[0.9936591,0.00022453758,0.005546643,0.000029569823,0.00018450357,0.00002321354,0.00003483834,0.00005359236,0.00024403818],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99829215,0.000014801383,0.00055654615,0.0004930406,0.00032731492,0.0003161477],"domain_scores_gemma":[0.99900365,0.000013708131,0.0001712881,0.0001973907,0.00042502416,0.00018891193],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018058268,0.00036560153,0.00043834533,0.00039385803,0.000145238,0.00012749506,0.00015301675,0.00031959196,0.0003129515],"category_scores_gemma":[0.000025600755,0.00037373605,0.0001261163,0.0004411173,0.0003343356,0.0010847393,0.000032619602,0.0004184978,0.00005461698],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001864959,0.000069057955,0.16324466,0.00068694097,0.00029584838,0.0000030565009,0.0010047472,0.00087945035,0.2790478,0.26528603,0.00028665384,0.2890093],"study_design_scores_gemma":[0.006523142,0.0017996271,0.01979189,0.0008671193,0.0005559864,0.0020461385,0.03603986,0.20109817,0.6205859,0.04500933,0.06204173,0.003641121],"about_ca_topic_score_codex":0.00004825117,"about_ca_topic_score_gemma":0.000012048574,"teacher_disagreement_score":0.3415381,"about_ca_system_score_codex":0.00008412736,"about_ca_system_score_gemma":0.000037735666,"threshold_uncertainty_score":0.99987143},"labels":[],"label_agreement":null},{"id":"W2955865348","doi":"10.29173/mocs97","title":"Mass Timber Modular Construction: Developments in Oregon","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Food and Agriculture; TallWood Design Institute; U.S. Department of Agriculture","keywords":"Modular design; Architectural engineering; Engineering; Government (linguistics); Scale (ratio); Frame (networking); Civil engineering; Business; Computer science; Telecommunications; Geography","score_opus":0.0040666031071489445,"score_gpt":0.169194541185728,"score_spread":0.16512793807857906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955865348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97211295,0.00034961628,0.0035728947,0.000076158554,0.0018647759,0.0004349946,0.000010773184,0.00038046893,0.021197353],"genre_scores_gemma":[0.97989136,0.0002223622,0.019052267,0.00006107154,0.00015184989,0.000050149865,0.00002853191,0.00005278377,0.0004896442],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99814045,0.000013282769,0.0005527568,0.0005429022,0.00032685246,0.00042373114],"domain_scores_gemma":[0.99935913,0.000012963959,0.00010757665,0.00015818917,0.0002147942,0.00014733526],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017587261,0.00038372027,0.00039360966,0.00046363883,0.00013458323,0.00018562474,0.00013630501,0.00032518202,0.00026862984],"category_scores_gemma":[0.000013430767,0.0004104751,0.000084186926,0.0005904373,0.00019905235,0.0008980456,0.000037870494,0.00041359398,0.00012947158],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000106216685,0.000035762612,0.6949878,0.0004917658,0.00021047765,0.000010513197,0.00060634624,0.0023856468,0.041710615,0.08825246,0.0006922641,0.17051016],"study_design_scores_gemma":[0.01610525,0.000479464,0.21779984,0.0017022033,0.00039609047,0.0030568875,0.016691709,0.29189926,0.12247112,0.0401432,0.28174987,0.007505109],"about_ca_topic_score_codex":0.000015263071,"about_ca_topic_score_gemma":0.000013469793,"teacher_disagreement_score":0.47718793,"about_ca_system_score_codex":0.00018429966,"about_ca_system_score_gemma":0.000039706236,"threshold_uncertainty_score":0.9998347},"labels":[],"label_agreement":null},{"id":"W2955871541","doi":"10.29173/mocs138","title":"Developing an Analytical Solution that Mimics Simulation Modeling for Construction Planning: Earthwork Case","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Earthworks; Benchmark (surveying); Plan (archaeology); Computer science; Field (mathematics); Industrial engineering; Operations research; Engineering; Mathematics; Geology","score_opus":0.04006334564664626,"score_gpt":0.26153334331250294,"score_spread":0.22146999766585668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955871541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60038394,0.00010871529,0.3977946,0.000038555652,0.00076400506,0.0003754755,0.000011079536,0.00029374994,0.00022991264],"genre_scores_gemma":[0.95223284,0.000036123645,0.047230627,0.000035245528,0.00028161827,0.000035702975,0.0000654378,0.000050057723,0.00003232299],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983762,0.000013679462,0.00047366603,0.00052271946,0.00023118503,0.0003825569],"domain_scores_gemma":[0.9991678,0.000036811387,0.000121571386,0.00013858538,0.00038129746,0.00015392239],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023236604,0.00033746098,0.00033212567,0.00035171272,0.00039400614,0.00028515086,0.00007917895,0.00035134214,0.000027377475],"category_scores_gemma":[0.000026714992,0.00037277452,0.00009347683,0.0003130872,0.00012310993,0.0013386435,0.000024455929,0.00027929075,0.0000077340665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031944658,0.00003129143,0.05674261,0.0007311501,0.00024761652,0.000014046279,0.0011455156,0.5785687,0.007644415,0.079760194,0.00008183024,0.2747132],"study_design_scores_gemma":[0.000782294,0.00007539117,0.00022251825,0.0001120359,0.00008737188,0.00081363274,0.00274633,0.9880876,0.0025182532,0.0024223977,0.0016529991,0.00047917874],"about_ca_topic_score_codex":0.000014116111,"about_ca_topic_score_gemma":0.000010910329,"teacher_disagreement_score":0.4095189,"about_ca_system_score_codex":0.00016541839,"about_ca_system_score_gemma":0.000039502007,"threshold_uncertainty_score":0.99987245},"labels":[],"label_agreement":null},{"id":"W2955909757","doi":"10.29173/mocs94","title":"A Pilot Study of Identifying Execution Plan Differences for Accelerated Bridge Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Plan (archaeology); Computer science; Preference; Process management; Operations management; Transport engineering; Engineering; Medicine","score_opus":0.038054593446177294,"score_gpt":0.23284344296574985,"score_spread":0.19478884951957257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955909757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9893424,0.00015230002,0.006936314,0.000013886292,0.0016005127,0.0010225653,0.000030239004,0.00028575215,0.0006160546],"genre_scores_gemma":[0.9979211,0.00007566098,0.0016374398,0.000007999183,0.00013289848,0.00009213286,0.000029826624,0.00003226083,0.00007068105],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9984933,0.000014377158,0.0005512624,0.0004231917,0.0002571257,0.00026072474],"domain_scores_gemma":[0.9991927,0.000028551698,0.0002008856,0.00012235799,0.00037044194,0.00008503035],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015659646,0.00028829585,0.0004010826,0.00035506624,0.00019417256,0.00018539376,0.000115503004,0.00010824478,0.000061072766],"category_scores_gemma":[0.000019342848,0.0002934516,0.00006625903,0.0003687948,0.0001401078,0.00073012454,0.00002789617,0.00020977572,0.0000066772527],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005272419,0.00023386024,0.7112515,0.0010206864,0.00042963828,9.683158e-7,0.0017082301,0.00024292154,0.18263936,0.016733084,0.00037616253,0.08483632],"study_design_scores_gemma":[0.019813424,0.008284241,0.6446136,0.0012740782,0.0010886529,0.00083753065,0.062072102,0.14472623,0.10203485,0.008814193,0.0029200818,0.0035210086],"about_ca_topic_score_codex":0.00008114053,"about_ca_topic_score_gemma":0.000049924067,"teacher_disagreement_score":0.14448331,"about_ca_system_score_codex":0.00006380424,"about_ca_system_score_gemma":0.000020391926,"threshold_uncertainty_score":0.9999518},"labels":[],"label_agreement":null},{"id":"W2955930255","doi":"10.29173/mocs117","title":"Decision-making for Cross-Laminated Timber Modular Construction Logistics Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Supply chain; Modular construction; Discrete event simulation; Process (computing); Modularity (biology); Event (particle physics); Work (physics); Engineering; Cross laminated timber; Construction engineering; Computer science; Civil engineering; Business; Simulation; Mechanical engineering","score_opus":0.009764285313812465,"score_gpt":0.2647800476268293,"score_spread":0.2550157623130168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955930255","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.557839,0.00014044259,0.43943444,0.000009023985,0.0014656492,0.0004999134,0.000035257413,0.00023534834,0.0003409648],"genre_scores_gemma":[0.94157857,0.000045338667,0.05783797,0.000023131503,0.00026961765,0.000033540706,0.000044292883,0.00007123884,0.00009628791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789125,0.0000130463495,0.00070680684,0.00060509046,0.00035382542,0.0004299917],"domain_scores_gemma":[0.99869627,0.0000958712,0.00023762643,0.00019535578,0.00065228285,0.00012261105],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024958258,0.00042150475,0.00041921227,0.00036293754,0.0003742198,0.00038689218,0.00012820373,0.00038888745,0.00013101843],"category_scores_gemma":[0.00010663821,0.00044195118,0.00017196196,0.00041211772,0.00027445017,0.0010175951,0.000048189206,0.0002941986,0.000018152035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002262496,0.000021010159,0.05271305,0.00044882006,0.00016970301,0.0000017481509,0.00020688366,0.8056137,0.014087952,0.015379955,0.00006360875,0.11106732],"study_design_scores_gemma":[0.0010396147,0.000069145965,0.0026559616,0.00027552232,0.00011367496,0.00011815941,0.0005511172,0.9829907,0.0022719728,0.0061744615,0.0031961156,0.00054358295],"about_ca_topic_score_codex":0.000007261854,"about_ca_topic_score_gemma":0.0000045414995,"teacher_disagreement_score":0.38373962,"about_ca_system_score_codex":0.00023659415,"about_ca_system_score_gemma":0.000033885255,"threshold_uncertainty_score":0.99980325},"labels":[],"label_agreement":null},{"id":"W2955960142","doi":"10.29173/mocs141","title":"Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visualization; Modular design; Vehicle routing problem; Computer science; Building information modeling; Integrated logistics support; Systems engineering; Routing (electronic design automation); Transport engineering; Operations research; Process management; Engineering; Operations management; Data mining; Embedded system","score_opus":0.009553049174982588,"score_gpt":0.21051484241603066,"score_spread":0.20096179324104807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955960142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7604574,0.0002249138,0.23754919,0.000027528935,0.00048342955,0.00041905174,0.000025051619,0.00024160724,0.00057183125],"genre_scores_gemma":[0.98173785,0.00010593233,0.017873786,0.00003351862,0.00008507612,0.000020826525,0.000072910145,0.000041334206,0.000028768067],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998461,0.000027565902,0.00051374105,0.00047270796,0.00027613022,0.00024883848],"domain_scores_gemma":[0.9991417,0.00004206249,0.00021882169,0.000116277195,0.00037745337,0.00010369307],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024140475,0.0003414085,0.00037439092,0.0004918432,0.00018388595,0.00018874125,0.00006142995,0.0002889404,0.00002037207],"category_scores_gemma":[0.00006798759,0.00033733202,0.000049276725,0.000493116,0.00029885056,0.00058062637,0.000026700127,0.0002993856,0.0000021872675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019857628,0.00005601082,0.27157503,0.0007682285,0.00014717215,0.0000030561591,0.0011923803,0.006786884,0.08401136,0.060177777,0.00006670541,0.5750168],"study_design_scores_gemma":[0.0010461307,0.0002163421,0.0076793646,0.00044170136,0.00007270458,0.00006882172,0.0032372056,0.9568586,0.02910421,0.0006222942,0.00027663732,0.00037600953],"about_ca_topic_score_codex":0.00003892055,"about_ca_topic_score_gemma":0.0000044405424,"teacher_disagreement_score":0.9500717,"about_ca_system_score_codex":0.000086297834,"about_ca_system_score_gemma":0.00003305847,"threshold_uncertainty_score":0.99990785},"labels":[],"label_agreement":null},{"id":"W2955994317","doi":"10.29173/mocs133","title":"Strategies for Building Information Modelling Adoption in the South African Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Procurement; Building information modeling; Business; Work (physics); Construction industry; Questionnaire; Process management; Test (biology); Process (computing); Knowledge management; Marketing; Operations management; Engineering; Construction engineering; Computer science","score_opus":0.009374625203429156,"score_gpt":0.1903746049770553,"score_spread":0.18099997977362614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955994317","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8442407,0.00009216608,0.1511265,0.00009131247,0.00068479974,0.0006300854,0.000019410196,0.00019789691,0.0029170935],"genre_scores_gemma":[0.98635536,0.000047395595,0.013219749,0.000048977494,0.00016078683,0.00010151739,0.00003053658,0.00002031669,0.000015367305],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998723,0.000013050346,0.0004731365,0.00025516757,0.0002418664,0.00029380128],"domain_scores_gemma":[0.999433,0.000025622738,0.000150835,0.000113969545,0.00021949928,0.000057094763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003073227,0.0002558914,0.00022926385,0.00038741878,0.00019614231,0.00047587955,0.00012495677,0.00036996676,0.000022825838],"category_scores_gemma":[0.000011220802,0.00023157938,0.00007672632,0.00045210385,0.00013094803,0.002336151,0.000016019212,0.00052047573,0.000007783916],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021135755,0.000026380407,0.049871042,0.0009600059,0.00012277722,6.800191e-7,0.008761109,0.14479193,0.0056930394,0.6203083,0.00031624697,0.16893716],"study_design_scores_gemma":[0.0018910723,0.00013378375,0.002615996,0.00023842031,0.00009558963,0.00018761374,0.12691568,0.8319423,0.0019825133,0.015963791,0.017249243,0.00078398874],"about_ca_topic_score_codex":0.00002245319,"about_ca_topic_score_gemma":0.000006071666,"teacher_disagreement_score":0.68715036,"about_ca_system_score_codex":0.00009644361,"about_ca_system_score_gemma":0.000038818926,"threshold_uncertainty_score":0.94435334},"labels":[],"label_agreement":null},{"id":"W2956000842","doi":"10.29173/mocs71","title":"Automatic Material Estimation by Translating BIM Data into ERP Readable Data for Panelized Residential Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Computer science; Prefabrication; Estimation; Process (computing); Cost estimate; Building information modeling; Production (economics); Resource (disambiguation); Systems engineering; Industrial engineering; Engineering; Scheduling (production processes); Civil engineering; Operations management","score_opus":0.014025071660805018,"score_gpt":0.22944036954830616,"score_spread":0.21541529788750113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956000842","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.907421,0.00046206487,0.08628477,0.00017099577,0.0027693124,0.0010558071,0.00065526017,0.0007585788,0.00042219888],"genre_scores_gemma":[0.88925225,0.00014492917,0.106625564,0.00002423184,0.00035435826,0.00006116512,0.0033846502,0.00007631969,0.000076513374],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978057,0.000020100028,0.0007096095,0.00079959194,0.00032328043,0.0003416745],"domain_scores_gemma":[0.9988597,0.00003462785,0.00021643589,0.0005777166,0.00019477557,0.00011673225],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036242633,0.00035729707,0.0004266512,0.00024266787,0.00031868287,0.00046229412,0.00044404724,0.00029180612,0.00024325671],"category_scores_gemma":[0.000061077546,0.00038259028,0.00005420866,0.00027111036,0.00018868974,0.002677365,0.0001242973,0.00022407314,0.000023891174],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029634518,0.000039752926,0.0055626556,0.002297164,0.0003809289,0.0000011459891,0.0006365944,0.0004222485,0.23545888,0.010272692,0.010573706,0.7340579],"study_design_scores_gemma":[0.0017949361,0.00007455642,0.00021427381,0.00021189489,0.000237534,0.00014069625,0.0018820125,0.9591765,0.018932397,0.0038978502,0.012829414,0.00060793763],"about_ca_topic_score_codex":0.00009860989,"about_ca_topic_score_gemma":0.0000329298,"teacher_disagreement_score":0.95875424,"about_ca_system_score_codex":0.00008019247,"about_ca_system_score_gemma":0.000049944745,"threshold_uncertainty_score":0.9998626},"labels":[],"label_agreement":null},{"id":"W2956029429","doi":"10.22260/isarc2019/0107","title":"Application of Virtual Reality in Task Training in the Construction Manufacturing Industry","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Task (project management); Virtual reality; Automation; Computer science; Manufacturing; Quality (philosophy); Human–computer interaction; Virtual machine; Manufacturing engineering; Simulation; Engineering; Systems engineering; Operating system","score_opus":0.010830899780006707,"score_gpt":0.2117044826069254,"score_spread":0.2008735828269187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956029429","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9894355,0.000011252321,0.000119639124,0.0001601921,0.00014640986,0.00022895663,0.0000031883385,0.000021774415,0.009873122],"genre_scores_gemma":[0.9998123,0.000004341561,0.00009547332,0.000012787276,0.00003296963,0.000021704554,9.281082e-7,0.00000674249,0.000012722164],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994083,0.0000064182304,0.00026303163,0.00009620587,0.00012890248,0.0000971529],"domain_scores_gemma":[0.99975544,0.0000240254,0.00009883506,0.000080052305,0.00003227425,0.00000937091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002752571,0.00007425152,0.00011585186,0.0000845332,0.000016580832,0.000011043982,0.00018840606,0.000126751,0.000008756129],"category_scores_gemma":[0.000017000448,0.00005279394,0.000033479202,0.00022030658,0.00006255103,0.00015659037,0.000017386734,0.00035836556,0.0000015055494],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073842246,0.000052550684,0.2886871,0.00051297626,0.000042415446,9.085916e-8,0.018946758,0.009919151,0.28248766,0.1310717,0.00017901618,0.2680267],"study_design_scores_gemma":[0.0013798479,0.00008331767,0.3913113,0.0005125587,0.000035464847,0.000064291286,0.0764367,0.03270076,0.46595767,0.029514935,0.0015735071,0.00042964978],"about_ca_topic_score_codex":0.00006618078,"about_ca_topic_score_gemma":0.000017045613,"teacher_disagreement_score":0.26759708,"about_ca_system_score_codex":0.000044328823,"about_ca_system_score_gemma":0.000012045629,"threshold_uncertainty_score":0.21528745},"labels":[],"label_agreement":null},{"id":"W2956114766","doi":"10.22260/isarc2019/0024","title":"Automated Mathematical-Based Design Framework for The Selection of Rigging Configuration","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Offset (computer science); Modular programming; Row; Computer science; Engineering drawing; Engineering; Reliability engineering; Database","score_opus":0.013670427000141792,"score_gpt":0.22913067007729132,"score_spread":0.21546024307714953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956114766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2145535,0.000069199,0.7779401,0.0005534848,0.00061651156,0.0015300834,0.0000056855965,0.0005739547,0.004157491],"genre_scores_gemma":[0.98088306,0.0000025973034,0.018938068,0.000018839362,0.00003408642,0.000053212538,4.8793044e-7,0.000014705373,0.000054927103],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994854,0.0000036616357,0.00021292477,0.000072403855,0.00013216824,0.0000934631],"domain_scores_gemma":[0.9994047,0.000198307,0.00011596503,0.000060913368,0.00020890488,0.000011154925],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021393088,0.00007995019,0.000113849135,0.000042095693,0.000057768768,0.000024264313,0.00013488675,0.00007730803,0.00007107701],"category_scores_gemma":[0.00011100566,0.000049121845,0.00006800324,0.00020383285,0.00003865692,0.00009582397,0.000005798189,0.000098234785,0.000005944323],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000102432416,0.00004132927,0.0016553254,0.0012609153,0.00014649695,5.968708e-9,0.00085136556,0.029870583,0.5634769,0.39258313,0.0027173322,0.0072941314],"study_design_scores_gemma":[0.00012021276,0.000026020582,0.00031030973,0.00013192264,0.00002931633,0.0000014851464,0.00017007293,0.5991723,0.38419127,0.015685054,0.00011450407,0.00004755499],"about_ca_topic_score_codex":0.0000019086315,"about_ca_topic_score_gemma":1.7207162e-7,"teacher_disagreement_score":0.7663296,"about_ca_system_score_codex":0.000028515935,"about_ca_system_score_gemma":0.000015647645,"threshold_uncertainty_score":0.20031308},"labels":[],"label_agreement":null},{"id":"W2958067827","doi":"10.1139/cjce-2018-0460","title":"A semantic-based framework for automated rule checking in healthcare construction projects","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universidade Federal do Rio Grande do Sul; Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Computer science; Redevelopment; Context (archaeology); Health care; Software engineering; Taxonomy (biology); Rule-based system; Systems engineering; Management science; Data science; Process management; Artificial intelligence; Engineering","score_opus":0.008341263069765991,"score_gpt":0.20901017998344232,"score_spread":0.20066891691367633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2958067827","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7284553,0.0013626429,0.2617765,0.00058140955,0.006323808,0.0006079203,0.000027739528,0.00035795584,0.00050671014],"genre_scores_gemma":[0.9888486,0.0000051006914,0.01094739,0.000030587333,0.00012069916,0.000009402461,0.0000033509618,0.000031557047,0.0000032558378],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992184,0.000008411391,0.0003317572,0.000079379635,0.00008624054,0.0002758205],"domain_scores_gemma":[0.99949485,0.000048820504,0.00006638169,0.00008896303,0.000113182534,0.00018781946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012657182,0.000122054924,0.0002035125,0.0005628725,0.00002777644,0.00004700622,0.00008518309,0.0001384808,0.000041161627],"category_scores_gemma":[0.000076154785,0.00013505215,0.00006938792,0.00029507006,0.000012151199,0.0001592682,0.0000013159279,0.0003105638,0.0000031403333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012296602,0.000003778449,0.021376079,0.0006773533,0.000048697148,0.000021316268,0.0003905176,0.9582739,0.0022115656,0.01255513,0.0002319873,0.004197372],"study_design_scores_gemma":[0.0006951163,0.00006673578,0.008303734,0.0012009075,0.000014138022,0.00016247672,0.0002056425,0.98489547,0.0014795237,0.0008929741,0.0018163751,0.00026688966],"about_ca_topic_score_codex":0.0002989681,"about_ca_topic_score_gemma":0.016792228,"teacher_disagreement_score":0.26039335,"about_ca_system_score_codex":0.00030680152,"about_ca_system_score_gemma":0.00040761664,"threshold_uncertainty_score":0.9370458},"labels":[],"label_agreement":null},{"id":"W2959463108","doi":"10.1139/cjce-2018-0382","title":"Design-related questions in the construction phase: the effect of using the Last Planner System in design management","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Tekes; Academy of Finland","keywords":"Planner; Phase (matter); Knowledge management; Engineering; Engineering management; Construction management; Design management; Collaborative design; Computer science; Construction engineering; Process management; Systems engineering; Systems design; Civil engineering; Information management","score_opus":0.0070712230067670615,"score_gpt":0.18812743259134243,"score_spread":0.18105620958457536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959463108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5499967,0.0016521612,0.4439553,0.00009115886,0.002363937,0.0008455966,0.0000048315223,0.000030096837,0.0010602643],"genre_scores_gemma":[0.9995788,0.000009865981,0.0003470058,0.0000036688718,0.00003567326,0.000008636246,4.7423904e-7,0.000012973584,0.0000029032426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920547,0.00013042061,0.00033889597,0.00005025502,0.00011375465,0.00016119517],"domain_scores_gemma":[0.9995603,0.00017198749,0.000071333896,0.00012452851,0.000027630384,0.000044218545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008528118,0.00010611483,0.00014750999,0.00032231282,0.00004328112,0.000038543956,0.0001789948,0.000055532335,0.000018092913],"category_scores_gemma":[0.000017653909,0.00006143283,0.000044991706,0.00040519037,0.000030216479,0.000111576395,0.000002590476,0.00032077997,0.0000016139065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000603152,0.0000010889485,0.00054825295,0.000058134206,0.000039735445,0.000016379567,0.00038805418,0.99542236,0.000497751,0.0017512025,0.00004474422,0.001226282],"study_design_scores_gemma":[0.0012313928,0.00011674294,0.0018456145,0.0010785572,0.00008402511,0.001048209,0.001875045,0.9910999,0.00086466706,0.000052639043,0.0005483398,0.0001548491],"about_ca_topic_score_codex":0.00019163059,"about_ca_topic_score_gemma":0.0025281848,"teacher_disagreement_score":0.44958216,"about_ca_system_score_codex":0.00022793353,"about_ca_system_score_gemma":0.000060199818,"threshold_uncertainty_score":0.25051582},"labels":[],"label_agreement":null},{"id":"W2959608112","doi":"10.4224/20373962","title":"Entertainment-based system for visual construction technology transfer: design and implementation","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Computer science; Entertainment; Representation (politics); Human–computer interaction; Multimedia; Engineering; Political science","score_opus":0.005461950992025521,"score_gpt":0.2295097673858054,"score_spread":0.22404781639377988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959608112","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36834458,0.000005214083,0.6304631,0.00007519001,0.0004414293,0.00026857568,0.000007091475,0.00021538613,0.00017942506],"genre_scores_gemma":[0.9671838,0.0000020398384,0.032563444,0.0000071246777,0.000039802064,0.00017850513,0.000012268468,0.000010551715,0.000002421431],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99963045,0.0000076963115,0.0001263902,0.00009159068,0.000046191264,0.00009768916],"domain_scores_gemma":[0.999864,0.000019415578,0.000010257671,0.000051265888,0.00003144264,0.000023633374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006437309,0.00007078663,0.000067519344,0.00010640648,0.000059293005,0.000021283646,0.000026389935,0.00008607424,0.000058105004],"category_scores_gemma":[0.0000022015918,0.00007180867,0.000018527273,0.000064091604,0.000042368152,0.000059451297,0.0000014596005,0.00007620065,0.0000019806687],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001686872,0.000003766968,0.00051751296,0.00006080472,0.000014620799,1.8155914e-7,0.00003453133,0.00008487839,0.74019194,0.048857536,0.000060681625,0.2101567],"study_design_scores_gemma":[0.0011856665,0.00011135879,0.000098357814,0.000014742158,0.000031685213,0.000047527625,0.0012060832,0.114729576,0.87909126,0.0017710312,0.0015764418,0.00013623935],"about_ca_topic_score_codex":0.0000012209888,"about_ca_topic_score_gemma":0.000012116358,"teacher_disagreement_score":0.5988393,"about_ca_system_score_codex":0.000026121139,"about_ca_system_score_gemma":0.000012667798,"threshold_uncertainty_score":0.29282725},"labels":[],"label_agreement":null},{"id":"W2960085298","doi":"10.1108/ci-06-2018-0052","title":"BIM-based framework for temporary facility layout planning in construction site","year":2019,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Solver; Process (computing); Page layout; Building information modeling; Data collection; Industrial engineering; Engineering","score_opus":0.017487760616347145,"score_gpt":0.24519119676363743,"score_spread":0.22770343614729027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2960085298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59067583,0.000032768807,0.40524465,0.000074043666,0.002316163,0.0004118113,0.000059104674,0.0003112757,0.00087434356],"genre_scores_gemma":[0.9522203,0.0000019534316,0.047011316,0.00009303073,0.00013993614,0.00011015938,0.00038320458,0.000022226262,0.00001782522],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985741,0.00003184255,0.0006674347,0.00031424867,0.00017897347,0.00023343472],"domain_scores_gemma":[0.99918777,0.000097852375,0.00016458938,0.00024979626,0.0002689049,0.00003109727],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002503935,0.00021577935,0.0002342282,0.00074928784,0.00008898897,0.00007315044,0.00007469647,0.0003204611,0.00019895441],"category_scores_gemma":[0.00008330696,0.00024815626,0.00005785074,0.0014310535,0.000105701656,0.0004994297,0.000008074118,0.0003510598,0.00006125357],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011773258,0.000018396839,0.6170417,0.00023497836,0.000030004063,6.500689e-7,0.00013418517,0.028974805,0.0072849602,0.270337,0.00025310557,0.07557248],"study_design_scores_gemma":[0.009419441,0.00041351822,0.16178462,0.0013889206,0.0000887732,0.00024239965,0.0060729957,0.47076464,0.0685896,0.23830879,0.03976335,0.0031629428],"about_ca_topic_score_codex":0.000010070643,"about_ca_topic_score_gemma":0.0000047037856,"teacher_disagreement_score":0.4552571,"about_ca_system_score_codex":0.0001889295,"about_ca_system_score_gemma":0.000085242296,"threshold_uncertainty_score":0.9999971},"labels":[],"label_agreement":null},{"id":"W2960998055","doi":"10.1139/cjce-2018-0571","title":"A reality-based energy analysis of high-performance residences: Part I","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Read Jones Christoffersen (Canada); University of Victoria","funders":"","keywords":"Residence; Energy performance; Building code; Benchmark (surveying); Architectural engineering; Code (set theory); Floor plan; Energy (signal processing); Plan (archaeology); Efficient energy use; Civil engineering; Engineering; Computer science; Engineering drawing; Statistics; Mathematics; Geography","score_opus":0.006347113355765993,"score_gpt":0.16792674821574252,"score_spread":0.16157963485997653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2960998055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94736934,0.00081628654,0.047310136,0.00007016494,0.0016084459,0.000036828555,0.000025864167,0.000036329384,0.0027266096],"genre_scores_gemma":[0.9996437,0.000029009298,0.00018116915,0.000015424643,0.00007534694,0.0000012976228,0.0000049143414,0.000012870605,0.000036293808],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999276,0.000008547621,0.00036137502,0.000059017377,0.00013028938,0.00016479395],"domain_scores_gemma":[0.999445,0.000031630407,0.000082443636,0.0001400046,0.00011818439,0.00018274381],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014343236,0.000095028256,0.00025982934,0.00084836746,0.000016427548,0.000019433983,0.000126101,0.00006322663,0.00038165058],"category_scores_gemma":[0.000018012688,0.00009545221,0.00010189326,0.0006851133,0.000016175809,0.00015882212,0.000001483606,0.0001276104,0.0000019456925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023634702,9.2128874e-7,0.0029093556,0.000042107968,0.00022006298,0.0000038310955,0.00003981273,0.9932952,0.00040348136,0.0016668051,0.00031850964,0.0010975777],"study_design_scores_gemma":[0.00031125016,0.00007755307,0.024826216,0.0003364034,0.000316804,0.000022980128,0.00005526578,0.95059395,0.005920455,0.00006340277,0.01722032,0.00025537887],"about_ca_topic_score_codex":0.0019315967,"about_ca_topic_score_gemma":0.081778444,"teacher_disagreement_score":0.07984685,"about_ca_system_score_codex":0.00010725135,"about_ca_system_score_gemma":0.00021897683,"threshold_uncertainty_score":0.9349767},"labels":[],"label_agreement":null},{"id":"W2962985295","doi":"10.35490/ec3.2019.172","title":"Construction progress visualisation for varied stages of the individual elements with BIM: A case study","year":2019,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Schedule; Visualization; Building information modeling; Computer science; Construction management; Critical path method; Plan (archaeology); Process (computing); Systems engineering; Resource (disambiguation); Construct (python library); Facility management; Scheduling (production processes); Project management; Construction engineering; Engineering; Civil engineering; Operations management; Data mining","score_opus":0.018356767750097,"score_gpt":0.2630730913886951,"score_spread":0.2447163236385981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2962985295","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9809445,0.000021125687,0.016080437,0.000008490743,0.0014384271,0.0013046726,0.000017887944,0.00011141468,0.00007304533],"genre_scores_gemma":[0.98943603,8.496861e-7,0.010430715,0.0000038979074,0.00006220349,0.000032357017,0.000012906444,0.00001840494,0.0000026429502],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890274,0.00007379201,0.0004460353,0.00020874782,0.000208282,0.00016039124],"domain_scores_gemma":[0.9993774,0.00006145286,0.00020259613,0.00019497123,0.00014236482,0.000021164888],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000279124,0.00014965322,0.00018404011,0.00017575458,0.000107442254,0.000051936873,0.0000935428,0.00007787592,0.000010525508],"category_scores_gemma":[0.000013780142,0.00012031198,0.000039837236,0.0004220778,0.00014382137,0.00016706163,0.000025048863,0.0001581448,7.5812034e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003908031,0.00005440198,0.8880456,0.0001053126,0.00009288909,0.0000026534344,0.00217724,0.010968456,0.0002018036,0.0026967914,0.0000044995727,0.09561127],"study_design_scores_gemma":[0.018617738,0.0020680209,0.29884133,0.0011003878,0.00065526314,0.0051705274,0.21911617,0.43671083,0.0138927875,0.0019367762,0.00021676585,0.0016734152],"about_ca_topic_score_codex":0.00004186821,"about_ca_topic_score_gemma":0.00007363817,"teacher_disagreement_score":0.5892043,"about_ca_system_score_codex":0.000078128236,"about_ca_system_score_gemma":0.0000496588,"threshold_uncertainty_score":0.49061805},"labels":[],"label_agreement":null},{"id":"W2963803687","doi":"10.35490/ec3.2019.162","title":"Planning and scheduling bridge girders fabrication through shop-floor operations simulation","year":2019,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Computer science; Bridge (graph theory); Modular design; Workflow; Job shop; Production (economics); Production planning; Industrial engineering; Job shop scheduling; Manufacturing engineering; Operations research; Systems engineering; Flow shop scheduling; Engineering; Schedule; Operations management","score_opus":0.018520114141961676,"score_gpt":0.2631673357793539,"score_spread":0.24464722163739225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963803687","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6590746,0.00017235275,0.3382634,0.00002368497,0.0010913512,0.000157376,8.949889e-7,0.00020332547,0.0010129915],"genre_scores_gemma":[0.97913414,0.000013046694,0.020623757,0.000024732239,0.00014794375,0.000004909813,0.000021264617,0.000018017716,0.000012207581],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991738,0.000030429377,0.00031059305,0.00022422518,0.00010344426,0.00015746299],"domain_scores_gemma":[0.99966633,0.00005976979,0.000040536535,0.00012616705,0.00008034095,0.000026868682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011146179,0.00013261281,0.00013730321,0.00015316921,0.0001152259,0.00009332656,0.000049210197,0.00010892081,0.000027868777],"category_scores_gemma":[0.00003748441,0.0001556028,0.000025181767,0.0002855674,0.000050175055,0.00043727385,0.000016723365,0.0002120182,0.000025173526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036821264,0.0000033882948,0.044838592,0.000029203033,0.000008637895,2.3796994e-7,0.00054271606,0.90969247,0.0012045885,0.002260956,0.0000060565308,0.04140946],"study_design_scores_gemma":[0.00035587035,0.000011452036,0.039892122,0.00010094332,0.0000070838746,0.000026381678,0.0005344795,0.957965,0.00041199988,0.00037225304,0.00015986104,0.00016256412],"about_ca_topic_score_codex":0.000030227271,"about_ca_topic_score_gemma":0.0000082475735,"teacher_disagreement_score":0.3200595,"about_ca_system_score_codex":0.0000913023,"about_ca_system_score_gemma":0.00002053696,"threshold_uncertainty_score":0.6345298},"labels":[],"label_agreement":null},{"id":"W2965227583","doi":"10.1139/cjce-2018-0424","title":"Using the Last Planner System to tackle the social aspects of BIM-enabled MEP coordination","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Process management; CLARITY; Building information modeling; Rework; Accountability; Knowledge management; Action research; Teamwork; Engineering; Engineering management; Computer science; Systems engineering; Operations management; Management","score_opus":0.007582796381624694,"score_gpt":0.18654511435929985,"score_spread":0.17896231797767514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965227583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9054452,0.0006040748,0.07643449,0.0004659967,0.004743097,0.00030912142,0.000020804611,0.000054856835,0.011922352],"genre_scores_gemma":[0.99956757,8.3601856e-7,0.00008116849,0.000013626041,0.00029363343,0.0000016982208,5.751022e-7,0.00001910749,0.000021766724],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939454,0.000014845347,0.0002471343,0.000045420078,0.00013033161,0.00016770702],"domain_scores_gemma":[0.9995723,0.000032278458,0.00006906263,0.00008696769,0.00013572616,0.00010366617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020768128,0.000091069225,0.00014404068,0.00020904263,0.000081006285,0.000049501446,0.00015953976,0.000052529394,0.000050702063],"category_scores_gemma":[0.000024024977,0.00006336954,0.000064255684,0.00028213338,0.000013719396,0.00012259392,0.0000041368976,0.00019335991,0.000005037089],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028961003,0.0000010189513,0.00036311796,0.00008886654,0.00007987001,0.0000059417994,0.0010002498,0.96213174,0.008908912,0.02591775,0.001063293,0.0004363604],"study_design_scores_gemma":[0.001199484,0.00013992461,0.010231131,0.0012617868,0.00019900304,0.0010606817,0.009632681,0.9136291,0.010624319,0.00024732892,0.051057152,0.0007173666],"about_ca_topic_score_codex":0.0002411851,"about_ca_topic_score_gemma":0.011185061,"teacher_disagreement_score":0.09412238,"about_ca_system_score_codex":0.00023977317,"about_ca_system_score_gemma":0.00015616865,"threshold_uncertainty_score":0.62415266},"labels":[],"label_agreement":null},{"id":"W2965824033","doi":"","title":"Integrated Parcel Maintenance: Trends and Directions","year":2019,"lang":"en","type":"article","venue":"GEOMATICA","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Geography; Cartography; Regional science; Computer science","score_opus":0.004778738992552531,"score_gpt":0.18676127381412175,"score_spread":0.18198253482156923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965824033","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77115107,0.00022002899,0.0036667022,0.00031413123,0.00089388434,0.00008586079,0.000012838019,0.0005684428,0.22308704],"genre_scores_gemma":[0.9940435,0.00004609377,0.00096527184,0.000026034968,0.000024534836,0.000014813767,0.000009341413,0.000009679482,0.004860727],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99967057,0.0000068144,0.00010192167,0.00007319019,0.00004548845,0.00010201455],"domain_scores_gemma":[0.99982405,0.00001436768,0.000009772675,0.00009861795,0.00001979125,0.000033380442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000029356164,0.00006870127,0.00007903123,0.00007910803,0.000028616118,0.00002710847,0.000029433933,0.000042111824,0.00065913564],"category_scores_gemma":[0.000005963702,0.000057205067,0.000020400772,0.00016739573,0.000022185586,0.00007261713,0.0000054372636,0.000078283505,0.00016691552],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007633444,0.000017617404,0.007063986,0.000084693376,0.000078877136,0.0000014131878,0.0005204531,0.0002550664,0.0064618587,0.032153238,0.015779043,0.9375761],"study_design_scores_gemma":[0.0011574425,0.000105078325,0.12821141,0.00020040087,0.00006352154,0.00019332104,0.0015994906,0.2889331,0.0031556762,0.007879141,0.56779355,0.0007078552],"about_ca_topic_score_codex":0.000013031376,"about_ca_topic_score_gemma":0.000014566597,"teacher_disagreement_score":0.93686825,"about_ca_system_score_codex":0.000018883879,"about_ca_system_score_gemma":0.000005479366,"threshold_uncertainty_score":0.72170734},"labels":[],"label_agreement":null},{"id":"W2967043432","doi":"10.1080/19386362.2019.1655622","title":"Improve the design process of pile foundations using construction control techniques","year":2019,"lang":"en","type":"article","venue":"International Journal of Geotechnical Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Pile; Load testing; Engineering; Process (computing); Control (management); Plan (archaeology); Dynamic load testing; Static analysis; Structural engineering; Civil engineering; Reliability engineering; Computer science","score_opus":0.007398493236170634,"score_gpt":0.23736875133851273,"score_spread":0.2299702581023421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2967043432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11201545,0.00007949102,0.8859413,0.000092757626,0.0014940315,0.00016371852,0.0000074038708,0.00008556405,0.00012025407],"genre_scores_gemma":[0.987785,0.000026003732,0.011922887,0.000014050672,0.00022491679,0.0000064711603,9.5212215e-7,0.000016447471,0.0000032688572],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901634,0.000014816566,0.0004991861,0.00006602222,0.00030654835,0.00009705413],"domain_scores_gemma":[0.99909407,0.000117320255,0.00018681545,0.000103781786,0.00046674965,0.00003123677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027235923,0.00010451916,0.00016705324,0.00019393917,0.000018648703,0.00003823132,0.00030384323,0.00008997602,0.00005184554],"category_scores_gemma":[0.00007718825,0.00008106264,0.00010633306,0.00013616214,0.000045250174,0.00028910497,0.0000098649725,0.000306857,0.0000023107225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002780957,0.000011824287,0.00008966752,0.000017635017,0.00012620522,0.0000013947505,0.000026531203,0.8127544,0.1736491,0.0028676766,0.0000157332,0.010412007],"study_design_scores_gemma":[0.00044651746,0.00009233761,0.00019154852,0.00016535612,0.00004360141,0.00038963972,0.00007673091,0.8809286,0.11563181,0.0008176202,0.0010835788,0.00013269746],"about_ca_topic_score_codex":0.000003231039,"about_ca_topic_score_gemma":1.593989e-7,"teacher_disagreement_score":0.87576956,"about_ca_system_score_codex":0.000105356,"about_ca_system_score_gemma":0.000053537882,"threshold_uncertainty_score":0.33056384},"labels":[],"label_agreement":null},{"id":"W2967842370","doi":"10.1139/cjce-2019-0107","title":"An application framework for development of a maintenance management system based on building information modeling and radio-frequency identification: case study of a stadium building","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Facility management; Radio-frequency identification; Stadium; Building information modeling; Identification (biology); Management system; Computerized maintenance management system; Computer science; The Internet; Workload; Engineering; Systems engineering; Preventive maintenance; Computer security; Reliability engineering; Operations management; World Wide Web","score_opus":0.006821878601667883,"score_gpt":0.201666183574578,"score_spread":0.1948443049729101,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2967842370","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43389064,0.00003415319,0.5655966,0.0000025380039,0.00019265499,0.00024343195,0.0000036049719,0.000011809087,0.000024577193],"genre_scores_gemma":[0.9510001,0.0000014953023,0.048925932,0.0000021086448,0.000026949961,0.000026176123,0.00000204044,0.00001475015,4.5514176e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990113,0.00000833033,0.0006327996,0.00007905964,0.00013325983,0.00013530155],"domain_scores_gemma":[0.99930906,0.000026140673,0.00018711497,0.00015702716,0.00019696735,0.00012369113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003514365,0.00010989434,0.00018098386,0.00055205997,0.000047749458,0.00004054045,0.0001038979,0.000054457483,0.0000023246118],"category_scores_gemma":[0.000016082178,0.00011864123,0.00003078932,0.00019146086,0.0000060400157,0.00035553754,0.0000024736664,0.0001142775,2.1605418e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063556745,0.0000073648243,0.00025728458,0.00064269,0.000046895144,0.0000056967556,0.0012149665,0.98055464,0.0011699343,0.010854862,0.0000019417735,0.0052373474],"study_design_scores_gemma":[0.00043161682,0.00008036175,0.00019530629,0.000571851,0.000030218254,0.00011414775,0.003960232,0.9937994,0.00056490424,0.00007774543,0.00006047381,0.000113741844],"about_ca_topic_score_codex":0.00011339861,"about_ca_topic_score_gemma":0.0009395511,"teacher_disagreement_score":0.51710945,"about_ca_system_score_codex":0.0002758122,"about_ca_system_score_gemma":0.00008756369,"threshold_uncertainty_score":0.48380488},"labels":[],"label_agreement":null},{"id":"W2968234261","doi":"10.5267/j.esm.2019.6.004","title":"Optimization of steel buildings by changing structural system and using lightweight materials","year":2019,"lang":"en","type":"article","venue":"Engineering Solid Mechanics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Materials science; Structural engineering; Computer science; Mechanical engineering; Engineering; Construction engineering","score_opus":0.003306788348041413,"score_gpt":0.17613617268569953,"score_spread":0.17282938433765813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968234261","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61792725,0.00029913953,0.3799354,0.000001991715,0.0013884666,0.0001481998,0.000023441607,0.00024341539,0.000032685148],"genre_scores_gemma":[0.9864596,0.000027015942,0.013356226,0.0000023009377,0.000069939466,0.0000056836957,0.000014742142,0.00004538075,0.000019106363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927706,0.000007214586,0.00026853976,0.00013521525,0.00011291644,0.00019904283],"domain_scores_gemma":[0.99972105,0.000011335673,0.000058482852,0.00012464027,0.000041892286,0.000042580923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009618784,0.00016349372,0.00023523431,0.00017474992,0.000031105574,0.000039217473,0.00006535797,0.000113996146,0.00003352041],"category_scores_gemma":[0.0000050919175,0.00017067128,0.000026958995,0.00017306767,0.0000038976177,0.00018810024,0.000022265507,0.00007724911,0.0000020061377],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027170886,7.3326873e-7,0.000003998756,0.00029164972,0.00002418218,2.485953e-7,0.00010470188,0.54064786,0.4443022,0.014487584,0.00000491637,0.00012922929],"study_design_scores_gemma":[0.0001321584,0.000013500781,0.0000015406395,0.00013109102,0.000015097689,0.000025928293,0.0001031682,0.7351135,0.26424956,0.000009319672,0.00007423169,0.00013088509],"about_ca_topic_score_codex":0.0000034770012,"about_ca_topic_score_gemma":9.0999656e-8,"teacher_disagreement_score":0.36853236,"about_ca_system_score_codex":0.000079126185,"about_ca_system_score_gemma":0.0000063965276,"threshold_uncertainty_score":0.6959773},"labels":[],"label_agreement":null},{"id":"W2968752924","doi":"","title":"Architectures temporaires pour chantiers de construction éphémères / Temporary Architectures for Ephemeral Construction Sites","year":2014,"lang":"fr","type":"article","venue":"Esse/Esse arts + opinions","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ephemeral key; Computer science; Geology; Computer security","score_opus":0.014339472923837044,"score_gpt":0.24494416494253637,"score_spread":0.23060469201869932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968752924","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57312185,0.006513032,0.3193009,0.06358331,0.020728279,0.0022417204,0.0010546392,0.0017061946,0.011750083],"genre_scores_gemma":[0.93159837,0.0001630298,0.062221903,0.00030123428,0.0039614947,0.00033334113,0.00048336742,0.00016400445,0.0007732503],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966771,0.00027245047,0.0009207071,0.00077829754,0.0003642105,0.0009872324],"domain_scores_gemma":[0.9978516,0.0005617861,0.00035807615,0.0005778442,0.00025264733,0.0003980358],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040840756,0.0007557311,0.0006642505,0.00061186345,0.0008492125,0.0003020554,0.00033083186,0.00055548665,0.00039628003],"category_scores_gemma":[0.0003487089,0.0008089714,0.0004411407,0.00048086536,0.000981292,0.00023884633,0.000069099624,0.0007403873,0.00005714606],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002416032,0.00021766842,0.021956807,0.0012625103,0.00062760623,0.000007934166,0.0019307787,0.028536923,0.009686753,0.7152127,0.03560662,0.18471207],"study_design_scores_gemma":[0.0038371622,0.0006486322,0.006899361,0.0014398833,0.0004388152,0.002440942,0.0042875884,0.08449746,0.074264914,0.25040248,0.56828177,0.0025610041],"about_ca_topic_score_codex":0.00048319707,"about_ca_topic_score_gemma":0.00034491322,"teacher_disagreement_score":0.53267515,"about_ca_system_score_codex":0.00018749844,"about_ca_system_score_gemma":0.000356853,"threshold_uncertainty_score":0.99943614},"labels":[],"label_agreement":null},{"id":"W2968879609","doi":"10.1139/cjce-2018-0703","title":"Owner requirements in as-built BIM deliverables and a system architecture for FM-specific BIM representation","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Facility management; Task (project management); Deliverable; Computer science; Task management; Systems engineering; Representation (politics); Architecture; Information model; Plan (archaeology); Process management; Engineering; Software engineering; Operations management","score_opus":0.01071361609259655,"score_gpt":0.1997464291636206,"score_spread":0.18903281307102404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968879609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8736749,0.0028348404,0.11840341,0.00014931345,0.0025349276,0.0003779241,0.000019093059,0.000057368296,0.0019482189],"genre_scores_gemma":[0.9990244,0.000040434807,0.0007402557,0.000008076546,0.00012838854,0.0000054004527,0.000002811202,0.000022456374,0.000027788508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993521,0.000008186217,0.00027990225,0.00008610411,0.000086355445,0.00018735905],"domain_scores_gemma":[0.9996001,0.000030597108,0.00004709929,0.000086578664,0.00007043908,0.00016519212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000121518584,0.0001058656,0.0001604566,0.00048438806,0.000025232168,0.000057203706,0.00007417533,0.00006776517,0.0000412596],"category_scores_gemma":[0.00002017023,0.00009283258,0.00004503484,0.0001618249,0.000009064512,0.00018561531,0.0000026384,0.00016219303,0.0000030996964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031347754,0.0000034113236,0.007337994,0.0005114905,0.000106435,0.00004766418,0.0008966284,0.9422428,0.013880673,0.012213308,0.00070553774,0.022022715],"study_design_scores_gemma":[0.008178411,0.00066710013,0.036967877,0.0054989564,0.00014365565,0.0033238006,0.005766859,0.7330765,0.012510938,0.0036291978,0.18816547,0.0020711946],"about_ca_topic_score_codex":0.0003404648,"about_ca_topic_score_gemma":0.019318651,"teacher_disagreement_score":0.20916626,"about_ca_system_score_codex":0.00020473773,"about_ca_system_score_gemma":0.00006418267,"threshold_uncertainty_score":0.9985762},"labels":[],"label_agreement":null},{"id":"W2969409284","doi":"10.18059/jmi.v3i2.43","title":"Associating Knowledge-in-Use with Technology-in-Use While Comparing Building Information Modeling (BIM) in Finland and in Quebec","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal; Université du Québec en Outaouais","funders":"","keywords":"Building information modeling; Knowledge management; Work (physics); Order (exchange); Information technology; Business; Construction industry; Engineering; Computer science; Engineering management; Construction engineering; Operations management","score_opus":0.017730612414635024,"score_gpt":0.22339967010297782,"score_spread":0.2056690576883428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969409284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98973715,0.000041092222,0.0079035675,0.000047577672,0.0000707739,0.00012592546,7.432784e-7,0.00007347115,0.0019996683],"genre_scores_gemma":[0.9966587,0.000020730693,0.0032386275,0.0000044018766,0.000009477777,0.00002184486,0.000002404131,0.000008230356,0.00003557611],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993202,0.000010608135,0.00031504288,0.00010611308,0.000058235317,0.00018978516],"domain_scores_gemma":[0.99971646,0.000037111255,0.000056970726,0.00013774821,0.000033339016,0.000018370345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017008273,0.00011036208,0.00017848918,0.00054018415,0.0000652814,0.00026116514,0.00008117433,0.00013776151,0.0000025186612],"category_scores_gemma":[0.000082328894,0.00010701239,0.000009128725,0.00019768112,0.000021857802,0.0021457884,0.000035537378,0.00030487104,0.0000026631858],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009524942,0.0000076486585,0.84015805,0.00002792886,0.0000037595025,0.0000018300319,0.0007335935,0.14604262,0.00016663822,0.0027523586,0.0000037351733,0.010092298],"study_design_scores_gemma":[0.0007613812,0.0000044713597,0.116644815,0.0003098988,0.0000017048308,0.0000035406235,0.0010226672,0.88060325,0.00026131293,0.00022250779,0.00003372724,0.00013070495],"about_ca_topic_score_codex":0.009589166,"about_ca_topic_score_gemma":0.27218348,"teacher_disagreement_score":0.73456067,"about_ca_system_score_codex":0.00022635634,"about_ca_system_score_gemma":0.000021578866,"threshold_uncertainty_score":0.99700606},"labels":[],"label_agreement":null},{"id":"W2970484310","doi":"10.29173/aar56","title":"A Walk Through the City of Edmonton","year":2019,"lang":"en","type":"article","venue":"Alberta Academic Review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Architecture; Multidisciplinary approach; Engineering; Work (physics); Downtown; Engineering management; Geomatics; Statement of work; Architectural engineering; Civil engineering; Construction engineering; Computer science; Mechanical engineering; Geography","score_opus":0.01448575639864925,"score_gpt":0.2538665778529669,"score_spread":0.23938082145431766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970484310","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09850258,0.59753096,0.0006400172,0.0048620654,0.0013312177,0.0012598468,0.0000043312193,0.00010831783,0.29576066],"genre_scores_gemma":[0.7375532,0.25821763,0.00007824952,0.0012501989,0.00008837055,0.000042861055,0.0000054700895,0.000016403135,0.0027475965],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994146,0.000025572946,0.00028451884,0.00008465945,0.000096980795,0.00009362872],"domain_scores_gemma":[0.9995852,0.00009597129,0.00005703654,0.00022433959,0.000022239761,0.000015178525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113510054,0.000084317915,0.00019177081,0.000008531412,0.000014174141,0.0000028021761,0.00017176796,0.00008643893,0.0007367263],"category_scores_gemma":[0.000033764114,0.000052050174,0.00007689678,0.00014495454,0.000024114397,0.00012706032,0.000012911741,0.0002867812,0.00023429656],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011732553,0.000020161955,0.022084868,0.012246831,0.00033792265,4.0500012e-7,0.002058801,0.0001902531,0.008029285,0.26860124,0.15673597,0.5296825],"study_design_scores_gemma":[0.000085804015,0.000009462288,0.0009379206,0.0019686462,0.00005634434,0.000019430407,0.000024924826,0.000326435,0.00108405,0.001390984,0.99397933,0.00011666708],"about_ca_topic_score_codex":0.00016318017,"about_ca_topic_score_gemma":0.000020375175,"teacher_disagreement_score":0.8372434,"about_ca_system_score_codex":0.000015575219,"about_ca_system_score_gemma":0.000009322615,"threshold_uncertainty_score":0.80666363},"labels":[],"label_agreement":null},{"id":"W2970787930","doi":"10.35199/epde2019","title":"DS 95: Proceedings of the 21st International Conference on Engineering and Product Design Education (E&amp;PDE 2019), University of Strathclyde, Glasgow. 12th -13th September 2019","year":2019,"lang":"en","type":"paratext","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Nottingham Ningbo China; City, University of London; Indian Institute of Technology Guwahati; Universidade Federal do Rio de Janeiro; Technische Universiteit Delft; Åbo Akademi; Trent University; Universidade Federal do Rio Grande do Sul; Università della Calabria; Bulgarian Academy of Sciences; Brigham Young University; University of Waterloo; RWTH Aachen University; Loughborough University; Universiti Teknologi Malaysia; Instituto Tecnológico y de Estudios Superiores de Monterrey; Aston University; Aalborg Universitet; Edith Cowan University; Universidade de São Paulo; Royal College of Art; University of Nottingham; University of Bristol; University of Bath; Høgskolen i Oslo og Akershus; University of Derby; Cardiff Metropolitan University; University of Dammam; University of Leeds; Bucks New University; Technische Universität Clausthal; University of Brighton; Nottingham Trent University; Imperial College London; Liverpool John Moores University; Oklahoma State University; Universidad de San Buenaventura; Robert Gordon University; University of Hertfordshire; Ariel University; De Montfort University; Universität des Saarlandes; Bournemouth University; Arts University Bournemouth; Blekinge Tekniska Högskola; Coventry University; Dalian University of Technology; North Carolina State University; Norges Teknisk-Naturvitenskapelige Universitet; Arizona State University; London South Bank University; Northumbria University; Università Politecnica delle Marche; Universidad Pontificia Bolivariana; Sveučilište u Zagrebu","keywords":"Engineering; Product design; Library science; Engineering education; Product (mathematics); Management; Institution; Engineering management; Sociology; Computer science; Mathematics; Social science","score_opus":0.014885064746818754,"score_gpt":0.20920906147499382,"score_spread":0.19432399672817507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970787930","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06924279,0.0015448646,0.015524757,0.0002865843,0.01579561,0.0022205247,0.0006498724,0.00020508275,0.89452994],"genre_scores_gemma":[0.4883062,0.0032571473,0.007247667,0.000024217894,0.00053669495,0.000012178898,0.0003355072,0.00009684389,0.5001835],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99913096,0.000009318226,0.00024365622,0.00026023726,0.00023022866,0.00012558071],"domain_scores_gemma":[0.9991896,0.000023064305,0.00017214542,0.0001707089,0.00040565763,0.000038789094],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009382951,0.00024176585,0.0002574101,0.00014561057,0.000030316321,0.00003850806,0.00026791164,0.00019866806,0.0016281018],"category_scores_gemma":[0.000010495227,0.0002080988,0.000064459884,0.00014734166,0.00006426742,0.00020484328,0.000039408857,0.0003208023,0.00022826272],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052174702,0.00007250128,0.00030223178,0.0006561381,0.0002605288,4.683474e-8,0.00032535466,0.009424921,0.036461033,0.024325432,0.9225947,0.005524924],"study_design_scores_gemma":[0.0017436387,0.00029447678,0.0072812685,0.003817559,0.000368181,0.00008720081,0.002780457,0.041847907,0.09776307,0.0003864813,0.84136325,0.0022665346],"about_ca_topic_score_codex":0.00009614616,"about_ca_topic_score_gemma":0.000022066031,"teacher_disagreement_score":0.41906342,"about_ca_system_score_codex":0.000096781565,"about_ca_system_score_gemma":0.00023842901,"threshold_uncertainty_score":0.99928457},"labels":[],"label_agreement":null},{"id":"W2970844161","doi":"10.1061/9780784482308.001","title":"A Framework for the Contract Management System in Cloud-Based ERP for SMEs in the Construction Industry","year":2019,"lang":"en","type":"article","venue":"ICCREM 2019","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cloud computing; Business; Enterprise resource planning; Contract management; Construction industry; Process management; Industrial organization; Computer science; Engineering; Construction engineering; Operating system; Marketing","score_opus":0.009959230430971109,"score_gpt":0.22998827360710591,"score_spread":0.2200290431761348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970844161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5022395,0.0008151431,0.4765035,0.0013581112,0.00724355,0.0060339365,0.00011056928,0.00026093837,0.0054346956],"genre_scores_gemma":[0.99650335,0.000008230683,0.0027194184,0.00011283443,0.00015830164,0.00040686404,0.000011028863,0.000014721601,0.00006526638],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993898,0.000025667572,0.00020717838,0.000118609576,0.000095148534,0.0001635891],"domain_scores_gemma":[0.99932736,0.00037135472,0.00004328811,0.00022087738,0.000024606325,0.0000125260485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029864756,0.00010269434,0.00011873341,0.000072954645,0.00003949333,0.000052730004,0.00014627234,0.00020533892,0.000021606445],"category_scores_gemma":[0.000013102617,0.00006706729,0.000059004393,0.00014485254,0.000022752018,0.00006423277,0.0000045179536,0.0002836116,0.000018141827],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021349097,0.00003495384,0.0117915375,0.0006487164,0.00011081421,0.0000018583089,0.0006062063,0.05262948,0.00015318011,0.78612155,0.003448258,0.14423996],"study_design_scores_gemma":[0.006922524,0.00020730538,0.040771242,0.0016198715,0.00017774769,0.000048932154,0.029203946,0.7634935,0.0018768265,0.013695768,0.14112963,0.0008527],"about_ca_topic_score_codex":0.000033651908,"about_ca_topic_score_gemma":0.000046759058,"teacher_disagreement_score":0.7724258,"about_ca_system_score_codex":0.00008836963,"about_ca_system_score_gemma":0.000016157308,"threshold_uncertainty_score":0.27349246},"labels":[],"label_agreement":null},{"id":"W2971031665","doi":"","title":"A Cloud-Based Architecture for BIM as an Asset for Project Management","year":2019,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cloud computing; Architecture; Asset management; Systems engineering; Engineering management; Asset (computer security); Computer science; Engineering; Data science; Software engineering; Construction engineering; Business; Operating system; Computer security; Geography; Finance","score_opus":0.008258892364082398,"score_gpt":0.20875585355414897,"score_spread":0.20049696119006657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971031665","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9762096,0.000064426444,0.017175427,0.00015844319,0.0016864288,0.0026752972,0.0004656347,0.00028588908,0.0012788605],"genre_scores_gemma":[0.16309102,0.000096208016,0.077285126,0.00006390818,0.00036617607,0.00008506968,0.0161853,0.00025434105,0.74257284],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9993455,0.000013565826,0.000090015536,0.00024592932,0.00012497373,0.00018005927],"domain_scores_gemma":[0.99952435,0.00002081851,0.00008322368,0.00022008014,0.00011457967,0.00003691892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058921443,0.00020008904,0.00024089745,0.00032338948,0.000091404596,0.000022769043,0.00019689948,0.00025173966,0.000033271102],"category_scores_gemma":[0.0000024608041,0.00022862741,0.0001842692,0.00010424548,0.000019166664,0.000099278725,0.0000061407573,0.000120653014,0.000008935801],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.012390884,0.00064179074,0.00024899436,0.050597135,0.004336274,0.00003773946,0.2563455,0.051967554,0.01798317,0.07432102,0.08817251,0.4429574],"study_design_scores_gemma":[0.011662653,0.003417345,0.00089447753,0.0017754309,0.0023274845,0.0000108502745,0.63777566,0.12822476,0.027510842,0.007415706,0.17588286,0.0031019377],"about_ca_topic_score_codex":0.0012569467,"about_ca_topic_score_gemma":0.012231513,"teacher_disagreement_score":0.8131186,"about_ca_system_score_codex":0.000065047534,"about_ca_system_score_gemma":0.000050421393,"threshold_uncertainty_score":0.9323155},"labels":[],"label_agreement":null},{"id":"W2971142046","doi":"10.5539/ies.v12n9p70","title":"Establishing the Architectural Talents Cultivating System of Practice and Innovation Ability Under the Background of New Engineering","year":2019,"lang":"en","type":"article","venue":"International Education Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Architecture; Engineering management; Face (sociological concept); Field (mathematics); Architectural technology; Engineering; Key (lock); Engineering education; Teaching method; Knowledge management; Architectural engineering; Computer science; Construction engineering; Mathematics education; Operations management; Sociology","score_opus":0.028498780771223038,"score_gpt":0.3131834280686336,"score_spread":0.28468464729741055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971142046","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9904701,0.0006531649,0.0033690922,0.00073299423,0.0027455918,0.00013482817,0.0000031833401,0.000029402629,0.0018616035],"genre_scores_gemma":[0.9983703,0.000021974476,0.0012729093,0.00003736471,0.00013360716,0.00001613927,0.000004972855,0.0000062777713,0.00013647431],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99935424,0.00002122372,0.00030588428,0.00008161475,0.00018431184,0.000052738444],"domain_scores_gemma":[0.99846196,0.00046254884,0.00015141006,0.00010517809,0.0008106263,0.000008257325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025835732,0.000073561845,0.00009038678,0.00010473647,0.00003959109,0.000034732024,0.00010310423,0.000022099839,0.00000792529],"category_scores_gemma":[0.00029774985,0.000047331403,0.000020243695,0.00028366953,0.00004429646,0.0003051058,0.000030032257,0.00010599616,0.0000015441885],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046083063,0.00007348399,0.023611028,0.0007743486,0.0012494933,7.53655e-8,0.015339639,0.07193587,0.024305664,0.7669586,0.0017997914,0.093905956],"study_design_scores_gemma":[0.0012671251,0.000089689485,0.27351823,0.0017530755,0.00020494033,0.00017943898,0.6116989,0.05848977,0.016761433,0.005141655,0.030260306,0.0006354072],"about_ca_topic_score_codex":0.00010535129,"about_ca_topic_score_gemma":0.000006108427,"teacher_disagreement_score":0.7618169,"about_ca_system_score_codex":0.00009295312,"about_ca_system_score_gemma":0.000046868212,"threshold_uncertainty_score":0.19301187},"labels":[],"label_agreement":null},{"id":"W2971588297","doi":"10.11575/prism/32372","title":"Regional Transportation Infrastructure Project Prioritization: The Calgary Region Part A Report","year":2017,"lang":"en","type":"article","venue":"Open MIND","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Prioritization; Environmental planning; Transportation infrastructure; Business; Transport infrastructure; Regional science; Transport engineering; Environmental resource management; Geography; Engineering; Process management; Environmental science","score_opus":0.03375908893183913,"score_gpt":0.277078303971617,"score_spread":0.24331921503977785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971588297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72975546,0.00030093713,0.026287338,0.003461498,0.0042043626,0.002606073,0.000044396693,0.00007013961,0.23326981],"genre_scores_gemma":[0.9918709,0.00007227901,0.0033905117,0.000043461423,0.0004472936,0.00008770831,0.0002191674,0.000022519755,0.0038461674],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942654,0.00001240749,0.00019982678,0.0001516222,0.000120342294,0.00008926569],"domain_scores_gemma":[0.9994105,0.000008140288,0.000104113096,0.00039038813,0.00006418218,0.000022670849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009410642,0.000090229354,0.00008263421,0.0000228359,0.00034070903,0.00029964763,0.00027743584,0.00008073349,0.00020675329],"category_scores_gemma":[0.000017422177,0.00006724146,0.000033534587,0.000051248855,0.00006997713,0.0004517427,0.000009560009,0.00012614953,0.0000151359345],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005231259,0.0000152272905,0.013491298,0.000024107849,0.000082378356,0.00015330917,0.0021551456,0.00075617287,0.00047184594,0.0031576108,0.058001053,0.92163956],"study_design_scores_gemma":[0.00031726292,0.000016027117,0.061849322,0.00006469085,0.000032861208,0.00044696796,0.00029146732,0.0024327522,0.0009587316,0.0006898032,0.932718,0.0001821163],"about_ca_topic_score_codex":0.000053697164,"about_ca_topic_score_gemma":0.00028018476,"teacher_disagreement_score":0.9214574,"about_ca_system_score_codex":0.000026386584,"about_ca_system_score_gemma":0.00007594903,"threshold_uncertainty_score":0.2889509},"labels":[],"label_agreement":null},{"id":"W2973020604","doi":"10.1504/ijpqm.2020.10023977","title":"Modeling Construction labour productivity using Evolutionary Polynomial Regression","year":2019,"lang":"en","type":"article","venue":"International Journal of Productivity and Quality Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Schedule; Interdependence; Artificial neural network; Regression analysis; Evolutionary algorithm; Engineering; Regression; Industrial engineering; Econometrics; Computer science; Economics; Statistics; Mathematics; Machine learning","score_opus":0.024468356726526332,"score_gpt":0.2769901287661152,"score_spread":0.25252177203958887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2973020604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96497166,0.00032727385,0.02864599,0.0005181897,0.0047215205,0.00016200409,0.000008964485,0.000042507418,0.0006018699],"genre_scores_gemma":[0.99095774,0.00012010637,0.007962719,0.000013927972,0.0007608765,0.0000021350425,0.0000033746742,0.000011437958,0.00016769445],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986541,0.000093178794,0.00045502384,0.00020472548,0.00047005547,0.00012290584],"domain_scores_gemma":[0.99927676,0.000015955624,0.00017568881,0.00014537228,0.0003390064,0.000047229],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006705328,0.00013928223,0.00020012817,0.00026181707,0.00006228325,0.000066682725,0.00014390388,0.00005889476,0.000045379],"category_scores_gemma":[0.000034701166,0.00012789502,0.00007651583,0.00011516006,0.00005802302,0.0008782846,0.00006063234,0.00023561063,0.0000047464064],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010555072,0.00039289726,0.031308066,0.00074522325,0.0015619041,0.000025364441,0.0009194212,0.42605546,0.07252652,0.092886545,0.00044284645,0.37208024],"study_design_scores_gemma":[0.010049022,0.00054471457,0.13429573,0.0023087491,0.0005482239,0.0037655442,0.008163275,0.7070107,0.047012646,0.038937632,0.04437213,0.0029916395],"about_ca_topic_score_codex":0.000039015184,"about_ca_topic_score_gemma":0.000007856191,"teacher_disagreement_score":0.36908862,"about_ca_system_score_codex":0.00020444774,"about_ca_system_score_gemma":0.000028429346,"threshold_uncertainty_score":0.52154076},"labels":[],"label_agreement":null},{"id":"W2974593349","doi":"","title":"Framework for life-cycle infrastructure information modeling and management","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Process management; Business","score_opus":0.004857091498580967,"score_gpt":0.1909660981547585,"score_spread":0.18610900665617755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974593349","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048714716,0.000027432314,0.94316477,0.00009427613,0.00019446349,0.0002117177,0.0000013594978,0.00014748724,0.007443779],"genre_scores_gemma":[0.8886345,0.00005465915,0.11098034,0.00017175172,0.000038415103,0.00008555486,0.0000067919,0.000004701299,0.00002329262],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997622,0.0000011056968,0.00009966178,0.000034100307,0.00003654799,0.00006643022],"domain_scores_gemma":[0.99987704,0.0000061990613,0.00000777461,0.00005101505,0.000027147309,0.00003084848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000139788135,0.00005024107,0.000038038135,0.000041741783,0.000033204386,0.00007034604,0.000023208433,0.000052735915,0.0001423595],"category_scores_gemma":[0.0000051160528,0.000043579752,0.000011689746,0.00003663946,0.0000048662005,0.0004546094,0.0000063666967,0.000044249842,0.000022670738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002233535,0.0000010409693,0.000085683976,0.00013065636,0.000029806355,1.1548069e-8,0.00022009532,0.22779083,0.000019169272,0.388007,0.0033474748,0.380366],"study_design_scores_gemma":[0.00008431945,0.000003632833,0.0004225735,0.000008919023,0.000004262487,7.512321e-7,0.00038585637,0.921699,0.000028641547,0.07512212,0.0021840886,0.000055823304],"about_ca_topic_score_codex":0.0000057287025,"about_ca_topic_score_gemma":9.545488e-7,"teacher_disagreement_score":0.8399198,"about_ca_system_score_codex":0.00000987686,"about_ca_system_score_gemma":0.0000015992871,"threshold_uncertainty_score":0.17771307},"labels":[],"label_agreement":null},{"id":"W2974685136","doi":"10.1080/15623599.2019.1661572","title":"Integrating an expert system with BrIMS, cost estimation, and linear scheduling at conceptual design stage of bridge projects","year":2019,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Cost estimate; Bridge (graph theory); Computer science; Scheduling (production processes); Conceptual design; Interoperability; Decision support system; Software deployment; Operations research; Systems engineering; Industrial engineering; Engineering; Software engineering; Data mining; Operations management","score_opus":0.019171946870997107,"score_gpt":0.2499096707881216,"score_spread":0.2307377239171245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974685136","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44503194,0.00007964294,0.5527887,0.00002878055,0.00097254454,0.00024011586,0.0000073484284,0.000042378113,0.0008085923],"genre_scores_gemma":[0.8884898,0.000051621017,0.111212,0.00001572915,0.00010581866,0.00000825362,0.0000075138228,0.000015341502,0.00009391648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878037,0.00004758395,0.0005254862,0.00012643171,0.00042337872,0.00009677679],"domain_scores_gemma":[0.99897903,0.00003605981,0.0003518945,0.00009847708,0.00047726757,0.0000572976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023560342,0.00013746913,0.00019202646,0.0002856455,0.00003969519,0.00006106087,0.00014781118,0.00004762865,0.000065017215],"category_scores_gemma":[0.000010586086,0.000118480166,0.000040044048,0.0001022462,0.00010876755,0.0005503825,0.00002622421,0.00013223407,0.000004563585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069510815,0.00005933514,0.013874714,0.00035621016,0.001237699,0.000052528103,0.002211261,0.6520091,0.0076091797,0.11588106,0.00017337524,0.20584038],"study_design_scores_gemma":[0.0035419574,0.0004336554,0.003290128,0.0013196754,0.00008196274,0.0019628983,0.020233793,0.9482335,0.017821334,0.00008857612,0.0025820988,0.00041046375],"about_ca_topic_score_codex":0.00001378288,"about_ca_topic_score_gemma":0.00000622997,"teacher_disagreement_score":0.44345787,"about_ca_system_score_codex":0.00023198388,"about_ca_system_score_gemma":0.00003689405,"threshold_uncertainty_score":0.4831481},"labels":[],"label_agreement":null},{"id":"W2975132213","doi":"10.1061/(asce)cp.1943-5487.0000862","title":"Bayesian Inference with Markov Chain Monte Carlo–Based Numerical Approach for Input Model Updating","year":2019,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Markov chain Monte Carlo; Randomness; Stochastic simulation; Bayesian inference; Monte Carlo method; Probability distribution; Discrete event simulation; Markov chain; Inference; Bayesian probability; Data mining; Mathematical optimization; Machine learning; Artificial intelligence; Simulation; Mathematics; Statistics","score_opus":0.006382082863049515,"score_gpt":0.20018570175580216,"score_spread":0.19380361889275266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2975132213","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16387555,0.000059371647,0.83504546,0.000013367408,0.00020904437,0.00012620148,0.0000013161819,0.000069291105,0.0006003772],"genre_scores_gemma":[0.83173025,0.0000018352198,0.16811569,0.000013697805,0.000094288225,0.0000040357295,0.0000012669793,0.00003376569,0.000005180322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998935,0.0000125943025,0.00048050226,0.00012179198,0.00019937704,0.00025073887],"domain_scores_gemma":[0.99944806,0.00013304841,0.00013023092,0.00011488066,0.00010436384,0.00006943691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033209464,0.00018114835,0.00031196047,0.0002760408,0.000024668558,0.000048560185,0.00015194125,0.0000829064,0.000004147956],"category_scores_gemma":[0.000044571367,0.00016498344,0.00008000125,0.00025463654,0.000008369527,0.00017748996,0.0000126750965,0.0004249082,3.5430116e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001743882,0.0000121046005,0.0028524173,0.00015458558,0.000023986247,0.000001608311,0.00016604751,0.9938134,0.0006291269,0.0002869214,0.000014786736,0.0020276047],"study_design_scores_gemma":[0.00070694665,0.00006716352,0.00056288904,0.00029415303,0.000010424156,0.000035105895,0.000076014825,0.9977506,0.0002599118,0.000013953509,0.000035134268,0.00018771047],"about_ca_topic_score_codex":0.0000030347096,"about_ca_topic_score_gemma":0.0000039383144,"teacher_disagreement_score":0.66785467,"about_ca_system_score_codex":0.00012773603,"about_ca_system_score_gemma":0.000059602142,"threshold_uncertainty_score":0.67278296},"labels":[],"label_agreement":null},{"id":"W2977620183","doi":"10.1007/978-3-030-30949-7_14","title":"Automating the Integration of 4D Models in Game Engines for a Virtual Reality-Based Construction Simulation","year":2019,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Workflow; Schedule; Process (computing); Constructability; Software engineering; Game engine; Virtual reality; Software; Work (physics); Human–computer interaction; Systems engineering; Database","score_opus":0.022622889016887245,"score_gpt":0.24836560073700165,"score_spread":0.2257427117201144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2977620183","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024045482,0.00007035846,0.9951683,0.00007072747,0.0014421582,0.00045566572,0.000013912599,0.000084902436,0.00028941943],"genre_scores_gemma":[0.95189357,0.0000036658848,0.04780254,0.00004437674,0.00018977807,0.000014169271,0.000021344451,0.000019329185,0.000011214108],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988137,0.000016184462,0.0004439538,0.00028701674,0.00028135665,0.00015778844],"domain_scores_gemma":[0.998911,0.00045527998,0.00014906646,0.00026691222,0.00019912964,0.000018616143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038086608,0.00020841323,0.00024427843,0.0004310774,0.000053758944,0.00008342677,0.0002267733,0.00023527848,0.000005400211],"category_scores_gemma":[0.000055937267,0.0001666691,0.00007008501,0.00023589852,0.00026189725,0.0002633275,0.000021417569,0.00033196472,7.9863406e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051948646,0.0000017314012,0.000005515638,0.000034022913,0.0000024403655,8.368062e-8,0.00021355246,0.6838064,0.00023673815,0.023655947,4.76303e-7,0.29203787],"study_design_scores_gemma":[0.0001933869,0.00004583193,0.00004423917,0.00034733358,0.0000067336687,0.0000030478814,0.0000017704489,0.9650358,0.0019709864,0.032165483,0.000029845889,0.00015554295],"about_ca_topic_score_codex":0.000022409866,"about_ca_topic_score_gemma":0.00015741726,"teacher_disagreement_score":0.94948906,"about_ca_system_score_codex":0.00017760175,"about_ca_system_score_gemma":0.0001884723,"threshold_uncertainty_score":0.67965686},"labels":[],"label_agreement":null},{"id":"W2978270781","doi":"10.1007/978-3-030-30949-7_16","title":"Implementing Mobile Technology on Construction Sites: An Ethnographic Action Research Approach","year":2019,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Action (physics); Work (physics); Ethnography; Action research; Knowledge management; Building information modeling; Preference; Information technology; Engineering management; Process management; Business; Management; Operations management; Engineering; Sociology","score_opus":0.04531371501625905,"score_gpt":0.3089224841253742,"score_spread":0.2636087691091152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978270781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01677196,0.00020852128,0.96810615,0.000035236415,0.0016843961,0.0005851124,0.0000068261215,0.00042366458,0.01217814],"genre_scores_gemma":[0.9368667,0.00009034702,0.06219818,0.00004668463,0.0005537683,0.000051972584,0.000039285183,0.000056009496,0.00009707387],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99787134,0.000028277627,0.00030939342,0.0007018568,0.0005614617,0.0005276623],"domain_scores_gemma":[0.99894774,0.00009722245,0.00007680345,0.00058674946,0.00023482995,0.00005664752],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00078805827,0.0002742274,0.00024220157,0.0024461837,0.00029733157,0.0001785881,0.0004854089,0.00051717885,0.000044989334],"category_scores_gemma":[0.000017197219,0.00026749953,0.000055611577,0.00094111304,0.00073354767,0.00029863612,0.00012010968,0.0015346837,0.000030574756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004662289,0.0000098822875,0.00020669446,0.00005644905,0.000010233887,0.0000013986985,0.00022460382,0.06400241,0.0022507864,0.020248922,0.000007830264,0.91297615],"study_design_scores_gemma":[0.00037456636,0.00063939614,0.000084384745,0.0003747814,0.0000152360435,0.0001823323,0.000063632644,0.88424975,0.013424324,0.09173906,0.007955866,0.0008967023],"about_ca_topic_score_codex":0.000008631914,"about_ca_topic_score_gemma":0.00008685329,"teacher_disagreement_score":0.9200947,"about_ca_system_score_codex":0.0002633007,"about_ca_system_score_gemma":0.00012051906,"threshold_uncertainty_score":0.9999777},"labels":[],"label_agreement":null},{"id":"W2978753974","doi":"10.22260/isarc2019/0026","title":"Identification of the Structural State in Automated Modular Construction","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Identification (biology); Modular design; Computer science; Frame (networking); Scope (computer science); State (computer science); Strain gauge; Artificial intelligence; Machine learning; Accelerometer; Reliability engineering; Engineering; Programming language; Structural engineering","score_opus":0.0033597052930829465,"score_gpt":0.1863410040561371,"score_spread":0.18298129876305416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978753974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9979143,0.000027722928,0.00003012681,0.000058620037,0.0007310779,0.00022691298,0.0000073609804,0.00009019245,0.00091366353],"genre_scores_gemma":[0.9997586,0.000005722081,0.00010860104,0.000004184568,0.000012372829,0.0000059772938,5.382763e-7,0.000009204995,0.0000947791],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99935603,0.000004587052,0.0003017272,0.00008756196,0.00016312987,0.00008698557],"domain_scores_gemma":[0.9996058,0.0000065285085,0.0001529189,0.00009691736,0.00012818708,0.000009680055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010182256,0.000075372474,0.000102570564,0.00006224253,0.000025281024,0.000017328995,0.00020036679,0.000047316207,0.000015926196],"category_scores_gemma":[0.000021582999,0.000049295584,0.000052496456,0.0003191571,0.00008220769,0.00019665704,0.000027729682,0.0001146239,0.000003529187],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010672708,0.0000043332175,0.08276059,0.00017127395,0.000021609647,7.84485e-9,0.000696378,0.0087281475,0.8967174,0.0075421836,0.000108481785,0.003238884],"study_design_scores_gemma":[0.0002462412,0.00000750048,0.15577666,0.00008443302,0.000011736218,0.000011311297,0.0004992401,0.26584387,0.56749046,0.009904561,0.000039923714,0.00008408216],"about_ca_topic_score_codex":0.000024493991,"about_ca_topic_score_gemma":0.0000042461047,"teacher_disagreement_score":0.329227,"about_ca_system_score_codex":0.000045584966,"about_ca_system_score_gemma":0.000010508918,"threshold_uncertainty_score":0.20102155},"labels":[],"label_agreement":null},{"id":"W2979275617","doi":"10.29173/aar70","title":"Using Computer Simulations to Plan Construction Projects Accurately","year":2019,"lang":"en","type":"article","venue":"Alberta Academic Review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Integrated project delivery; Plan (archaeology); Project planning; Computer science; Work (physics); Quality (philosophy); Duration (music); Operations research; Construction management; Project management; Construction engineering; Transport engineering; Engineering; Civil engineering; Systems engineering","score_opus":0.06837778238064965,"score_gpt":0.31301317225809505,"score_spread":0.2446353898774454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979275617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8950878,0.030104108,0.04224167,0.0016005455,0.0066979304,0.004767711,0.000033006963,0.0006168721,0.018850371],"genre_scores_gemma":[0.9774253,0.009076008,0.009944843,0.002405386,0.00052325934,0.000048241585,0.00006472232,0.00006181838,0.00045045879],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991514,0.000030608382,0.0003566445,0.00018374516,0.00011142811,0.00016615663],"domain_scores_gemma":[0.9995697,0.000079967685,0.000054981592,0.00018080651,0.000045796405,0.000068714675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000070573566,0.00014604874,0.00023226847,0.00007712391,0.000038725906,0.000018405633,0.00011275783,0.00012678109,0.0003697204],"category_scores_gemma":[0.000021986789,0.00013314946,0.000052283845,0.0003299241,0.000014319555,0.00025939752,0.000018237924,0.00028107912,0.0005506115],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022903481,0.00002235671,0.042592056,0.0078076175,0.00033046302,0.0000020183982,0.0011521402,0.14657949,0.0216565,0.04587059,0.038196553,0.69576734],"study_design_scores_gemma":[0.0005772032,0.00006773671,0.0013380041,0.009789273,0.00021603284,0.00044940514,0.0000677381,0.39241385,0.0018894573,0.00051353395,0.59156317,0.0011145736],"about_ca_topic_score_codex":0.00003513949,"about_ca_topic_score_gemma":0.000011932133,"teacher_disagreement_score":0.69465274,"about_ca_system_score_codex":0.000060388862,"about_ca_system_score_gemma":0.000026812397,"threshold_uncertainty_score":0.7077181},"labels":[],"label_agreement":null},{"id":"W2979441038","doi":"10.1109/fuzz-ieee.2019.8858820","title":"Feature Selection for Construction Organizational Competencies Impacting Performance","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Curse of dimensionality; Feature selection; Computer science; Cluster analysis; Data mining; Fuzzy set; Fitness function; Feature (linguistics); Artificial intelligence; Fuzzy logic; Mean squared error; Machine learning; Genetic algorithm; Mathematics; Statistics","score_opus":0.0037695019693893173,"score_gpt":0.17458410425990722,"score_spread":0.1708146022905179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979441038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9165598,0.000018510977,0.07067364,0.00009201305,0.0011759149,0.0002105503,0.0000047160634,0.00043626566,0.01082856],"genre_scores_gemma":[0.9819962,0.000008376201,0.016809616,0.00002243809,0.00013369846,0.000009738609,0.000027785376,0.000013489949,0.0009786909],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968576,0.000003119165,0.00007294387,0.000077646466,0.000064838394,0.00009567538],"domain_scores_gemma":[0.9997862,0.000015890562,0.000018969105,0.00004129369,0.000118771866,0.000018898052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000032127773,0.00007163673,0.00006235583,0.000054879183,0.00007402473,0.000032067604,0.000027170101,0.00006495042,0.0003401707],"category_scores_gemma":[0.0000070255387,0.00006602699,0.000018450874,0.00016525554,0.0000117445625,0.00023444426,0.0000025834152,0.00007327237,0.000045921828],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041081115,0.0000127023995,0.31253174,0.00032551892,0.000107530395,3.7769972e-8,0.00027901502,0.040304832,0.4154559,0.11007862,0.008181944,0.11268109],"study_design_scores_gemma":[0.0006906359,0.00012279591,0.017803308,0.000033859713,0.000020937281,0.00018921947,0.0007006562,0.6831044,0.26599088,0.0006191696,0.0303469,0.00037722598],"about_ca_topic_score_codex":0.0000016793709,"about_ca_topic_score_gemma":0.000005390405,"teacher_disagreement_score":0.64279956,"about_ca_system_score_codex":0.000057097935,"about_ca_system_score_gemma":0.000018603609,"threshold_uncertainty_score":0.37246308},"labels":[],"label_agreement":null},{"id":"W2979793080","doi":"10.1016/j.jclepro.2019.118758","title":"Stochastic-based noise exposure assessment in modular and off-site construction","year":2019,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Noise (video); Noise exposure; Productivity; Risk analysis (engineering); Noise control; Construction industry; Factory (object-oriented programming); Engineering; Computer science; Construction engineering; Business; Noise reduction; Artificial intelligence; Medicine","score_opus":0.004323462391661307,"score_gpt":0.2013059711858827,"score_spread":0.19698250879422138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979793080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97867733,0.00026210255,0.018333625,0.0002304996,0.0021329238,0.00012785906,0.000001073862,0.0000269468,0.0002076374],"genre_scores_gemma":[0.9965876,0.000044452136,0.002999995,0.000012287413,0.0002938515,0.0000024163105,0.000002198068,0.000012817655,0.00004438489],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992295,0.000033838074,0.00034750457,0.00010849792,0.0001882281,0.00009245312],"domain_scores_gemma":[0.999582,0.000011064233,0.00012923681,0.000103677434,0.00013545003,0.000038564198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000262077,0.00009591593,0.00015864443,0.00025323022,0.000022290767,0.000030118139,0.000033842818,0.0000688785,0.000042017524],"category_scores_gemma":[0.000015950382,0.00008784213,0.000038565562,0.00012547558,0.00003143858,0.00037658002,0.0000039024494,0.00030370103,0.0000047248236],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067122295,0.00003022159,0.021732705,0.000064221735,0.000026058018,0.0000024027331,0.0001462093,0.80285084,0.05125792,0.0002912786,0.00013836919,0.12339264],"study_design_scores_gemma":[0.0058733,0.0011101392,0.27573636,0.000795571,0.00018195574,0.002444096,0.0029920263,0.65702057,0.041407607,0.0021809044,0.009314118,0.0009433417],"about_ca_topic_score_codex":0.0000032144922,"about_ca_topic_score_gemma":0.000008101789,"teacher_disagreement_score":0.25400367,"about_ca_system_score_codex":0.00010060076,"about_ca_system_score_gemma":0.00003795505,"threshold_uncertainty_score":0.3582098},"labels":[],"label_agreement":null},{"id":"W2980846909","doi":"10.1139/cjce-2018-0415","title":"Building information modeling and field operations: opportunities and challenges","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Field (mathematics); Plan (archaeology); Engineering; Engineering management; Systems engineering; Architecture; Process management; Construction engineering; Lean construction; Computer science; Construction industry; Risk analysis (engineering); Operations management; Business","score_opus":0.01848736600849919,"score_gpt":0.1786818757294637,"score_spread":0.16019450972096452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980846909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7582698,0.02601399,0.20742382,0.0011874224,0.0017085159,0.00012995541,0.0000063373727,0.00006632271,0.0051938533],"genre_scores_gemma":[0.9969553,0.0020758398,0.0008762573,0.000025921681,0.000053923333,0.0000011121341,5.187488e-7,0.0000065380154,0.0000046045084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996691,0.0000027720018,0.00016772175,0.000026536844,0.000044455493,0.00008944473],"domain_scores_gemma":[0.9997427,0.000014515,0.000013453012,0.000037208454,0.00005682675,0.00013532929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007479467,0.00006330722,0.00008324009,0.00025247846,0.000027757345,0.00007542917,0.000032388114,0.000045877503,0.000030133786],"category_scores_gemma":[0.000023450404,0.00006599817,0.000013737681,0.000030484855,0.000005280761,0.0007139324,0.0000025082556,0.00011258419,7.1652426e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010615813,3.1034867e-7,0.00008981941,0.00015119537,0.000027908749,0.0000029141427,0.00084978464,0.9253646,0.00036513252,0.0328687,0.000051714807,0.040226854],"study_design_scores_gemma":[0.00013921615,0.00002805247,0.000104995765,0.00016359091,0.000008446193,0.00019977977,0.0008215822,0.9852577,0.00015780347,0.00016240674,0.012845674,0.00011079109],"about_ca_topic_score_codex":0.00009747474,"about_ca_topic_score_gemma":0.0044732704,"teacher_disagreement_score":0.2386855,"about_ca_system_score_codex":0.000029511742,"about_ca_system_score_gemma":0.00004401034,"threshold_uncertainty_score":0.2691327},"labels":[],"label_agreement":null},{"id":"W2983521989","doi":"10.1108/ecam-03-2019-0119","title":"The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Knowledge management; Organizational structure; Informal organization; Perspective (graphical); Social network analysis; Architecture; Organizational network analysis; Digital transformation; Business; Computer science; Organizational learning; Social media; Management; World Wide Web","score_opus":0.0017285913169389174,"score_gpt":0.17155000174461318,"score_spread":0.16982141042767426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2983521989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9650341,0.000086299224,0.033608902,0.000020169426,0.0002849849,0.00028261967,0.000038994036,0.00010738729,0.00053654064],"genre_scores_gemma":[0.99856627,0.000036555302,0.0013045452,0.0000018664309,0.000031447667,0.000007677454,0.00002329998,0.00001840846,0.0000099257395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918026,0.000004903316,0.0003175222,0.00010816214,0.00017618356,0.0002129579],"domain_scores_gemma":[0.9996815,0.00005420618,0.000058130467,0.00012302173,0.00003487242,0.00004831627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000668686,0.00019674734,0.00016225444,0.00023675214,0.00006556996,0.000057739497,0.00007715053,0.00005393991,0.000019791474],"category_scores_gemma":[0.000010986454,0.00014294659,0.0000646127,0.00020129702,0.00004949772,0.00026915834,0.000032583615,0.00018386368,0.0000011705273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064549706,0.0000056365993,0.0028802431,0.0004147476,0.00027161572,3.5723815e-7,0.0008527005,0.7510681,0.002270768,0.07467849,0.0000052549226,0.16748755],"study_design_scores_gemma":[0.0025029832,0.00047351085,0.36316258,0.00026704025,0.00007308266,0.00045144337,0.00095052685,0.62267745,0.0058417898,0.0017302933,0.001113037,0.0007562649],"about_ca_topic_score_codex":0.000002659761,"about_ca_topic_score_gemma":9.6479e-7,"teacher_disagreement_score":0.36028233,"about_ca_system_score_codex":0.000029424384,"about_ca_system_score_gemma":0.0000067410447,"threshold_uncertainty_score":0.5829193},"labels":[],"label_agreement":null},{"id":"W2985572923","doi":"10.1080/15623599.2019.1686836","title":"BIM-integrated TOPSIS-Fuzzy framework to optimize selection of sustainable building components","year":2019,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Multiple-criteria decision analysis; TOPSIS; Sustainability; Computer science; Decision support system; Ideal solution; Process (computing); Fuzzy logic; Building information modeling; Analytic hierarchy process; Management science; Selection (genetic algorithm); Systems engineering; Operations research; Risk analysis (engineering); Engineering; Data mining; Machine learning; Artificial intelligence; Operations management","score_opus":0.004976882418034429,"score_gpt":0.22471981180531414,"score_spread":0.2197429293872797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985572923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60354143,0.000044584165,0.38361698,0.0002405808,0.0050843614,0.00025089807,0.0000049936557,0.00006355396,0.007152593],"genre_scores_gemma":[0.8987803,0.000066254215,0.10059472,0.000048956692,0.00017227826,0.000006199819,0.0000038461367,0.000015901785,0.0003115597],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856097,0.00003040265,0.0006217468,0.00012203617,0.0005062323,0.00015862678],"domain_scores_gemma":[0.9986815,0.000034363784,0.0002533413,0.000101354985,0.000860006,0.000069420435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021410997,0.00014152763,0.00021589949,0.000792869,0.000031637403,0.000081205355,0.00027335956,0.00007666751,0.00047237403],"category_scores_gemma":[0.000025554546,0.00013995919,0.000121466604,0.00038712742,0.000031213785,0.0003773623,0.000040320618,0.00022410204,0.000024180808],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036889178,0.000072207775,0.010591771,0.00011447017,0.001299992,0.000027950478,0.0001827468,0.23895328,0.012528939,0.6551393,0.0012416326,0.07947881],"study_design_scores_gemma":[0.013223546,0.0015552659,0.065067604,0.0048479014,0.0009148979,0.0038478526,0.032794602,0.10311033,0.18526824,0.16608392,0.4202707,0.0030151426],"about_ca_topic_score_codex":0.000015195057,"about_ca_topic_score_gemma":0.0000010060149,"teacher_disagreement_score":0.4890554,"about_ca_system_score_codex":0.00032780512,"about_ca_system_score_gemma":0.000025859441,"threshold_uncertainty_score":0.570737},"labels":[],"label_agreement":null},{"id":"W2985845493","doi":"","title":"Adopting the Principles of Building Physics, Smart Materials and New Technologies in the Design of Energy Efficient Buildings","year":2017,"lang":"en","type":"article","venue":"Environmental Reviews","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Efficient energy use; Architectural engineering; Environmentally friendly; Building automation; Climate change; Embodied energy; Global warming; Quality (philosophy); Environmental economics; Emerging technologies; Environmental quality; Building design; Environmental resource management; Engineering; Risk analysis (engineering); Computer science; Business; Environmental science; Ecology; Economics","score_opus":0.03491782709854111,"score_gpt":0.22931271173163,"score_spread":0.1943948846330889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985845493","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91682774,0.015999014,0.06620311,0.00012898608,0.00016479101,0.00043480916,0.0000040257614,0.00002882335,0.00020867927],"genre_scores_gemma":[0.9874905,0.00735148,0.005099397,0.0000052865594,0.000017399676,0.000020700567,6.0423355e-7,0.000005592062,0.000009042565],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99952376,0.000035534496,0.00023355329,0.00007219034,0.0000672075,0.00006775814],"domain_scores_gemma":[0.9995697,0.000032470733,0.00014908324,0.0002423335,4.6576056e-7,0.000005910328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003087074,0.00007738786,0.00014696436,0.000014572652,0.00006577958,0.00002232165,0.00019950255,0.000029627345,0.0000040798536],"category_scores_gemma":[0.000036863636,0.00004369431,0.000024981608,0.000021296975,0.00013410511,0.000048299986,0.000048679038,0.00004845522,7.5246373e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004334728,0.000016186525,0.0018643397,0.00005383788,0.0000120913355,2.9619403e-7,0.00038503626,0.0026990646,0.3694889,0.008237296,0.000044880395,0.61719376],"study_design_scores_gemma":[0.00032677857,0.000055434102,0.00921768,0.0006273524,0.000051215713,0.000016535905,0.0013317213,0.0045410553,0.8853567,0.0007893796,0.09743998,0.00024611223],"about_ca_topic_score_codex":0.000022872558,"about_ca_topic_score_gemma":0.0000017452875,"teacher_disagreement_score":0.61694765,"about_ca_system_score_codex":0.00001633414,"about_ca_system_score_gemma":0.0000020954997,"threshold_uncertainty_score":0.17818022},"labels":[],"label_agreement":null},{"id":"W2989704363","doi":"10.36680/j.itcon.2019.025","title":"A lean approach to optimize BIM information flow using value stream mapping","year":2019,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Value stream mapping; Building information modeling; Identification (biology); Process (computing); Productivity; Lean construction; Architecture; Process management; Engineering; Systems engineering; Information flow; Lean manufacturing; Computer science; Construction engineering; Knowledge management; Manufacturing engineering; Construction industry; Operations management","score_opus":0.0057682021033280215,"score_gpt":0.18820795976969387,"score_spread":0.18243975766636586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989704363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4783896,0.000019807687,0.51703644,0.00009659002,0.001210292,0.00022997106,0.000004964212,0.00013093544,0.0028814278],"genre_scores_gemma":[0.7468155,0.00002871773,0.2530303,0.00005583116,0.000044208682,0.000005542107,0.00001113744,0.0000068850914,0.0000018775698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848396,0.00001298485,0.0010403155,0.00005486663,0.00022671602,0.00018117842],"domain_scores_gemma":[0.99908227,0.00001454782,0.00039935354,0.0001532574,0.0003017808,0.000048795562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028389605,0.00015001619,0.00024728008,0.0027795571,0.000049839997,0.000078227706,0.00016835133,0.00029920205,0.000026214757],"category_scores_gemma":[0.00006935179,0.00014952029,0.000065072185,0.0011149053,0.00005132529,0.0037267362,0.000022517575,0.00046957302,0.000056444132],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003179981,0.0000101301075,0.0025439668,0.00007405871,0.000042940985,2.8839287e-7,0.00084784394,0.634569,0.0008135574,0.023150446,0.00008533997,0.3378306],"study_design_scores_gemma":[0.0018219287,0.00012278308,0.00073072914,0.00026982083,0.000024633853,0.001998511,0.014633805,0.9601652,0.009398032,0.0046821735,0.0057797567,0.00037263706],"about_ca_topic_score_codex":0.000006205401,"about_ca_topic_score_gemma":5.9052616e-7,"teacher_disagreement_score":0.33745798,"about_ca_system_score_codex":0.0003855094,"about_ca_system_score_gemma":0.00008453846,"threshold_uncertainty_score":0.609726},"labels":[],"label_agreement":null},{"id":"W2990810198","doi":"10.1061/(asce)co.1943-7862.0001747","title":"Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular programming; Risk analysis (engineering); Modular design; Risk management; Schedule; Process (computing); Computer science; Risk assessment; Systems engineering; Engineering","score_opus":0.009643938416521142,"score_gpt":0.23844107743330767,"score_spread":0.22879713901678653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990810198","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3837313,0.00032819144,0.6147944,0.000021373926,0.0007051855,0.00031898596,0.0000028512914,0.000032715834,0.00006501576],"genre_scores_gemma":[0.7311202,0.00034254257,0.26846057,0.0000043396362,0.00003300586,0.000015876923,0.0000012332976,0.000016075013,0.000006133537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990366,0.00010212051,0.00040047418,0.00017948446,0.0001155723,0.00016574905],"domain_scores_gemma":[0.9994032,0.00016988776,0.00019073686,0.00009986802,0.00008931325,0.00004698718],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009561323,0.00016615484,0.0002947699,0.0009617794,0.000045873912,0.000043871445,0.000050595845,0.000090397036,0.0000071416334],"category_scores_gemma":[0.000069935464,0.0001636018,0.00005488135,0.0003379379,0.00005938437,0.00028474827,0.0000143257,0.00022105471,1.504107e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020884714,0.000025377407,0.0061208783,0.0012681612,0.00053304475,0.0000074172185,0.00032544046,0.64119864,0.0026512586,0.033780005,0.000004192524,0.31387675],"study_design_scores_gemma":[0.0015802444,0.00011254983,0.007096193,0.00019272882,0.00020934422,0.0003168479,0.0017559216,0.97804993,0.001169002,0.009004779,0.00024508178,0.00026739392],"about_ca_topic_score_codex":0.000005361774,"about_ca_topic_score_gemma":0.0000013284774,"teacher_disagreement_score":0.34738892,"about_ca_system_score_codex":0.00015404032,"about_ca_system_score_gemma":0.000017482726,"threshold_uncertainty_score":0.66714877},"labels":[],"label_agreement":null},{"id":"W2991942790","doi":"10.5381/jot","title":"The Journal of Object Technology","year":2017,"lang":"en","type":"paratext","venue":"The Journal of Object Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Victoria; Université de Montréal","funders":"","keywords":"Computer science; Object (grammar); Artificial intelligence","score_opus":0.007350684574505722,"score_gpt":0.23718608365782987,"score_spread":0.22983539908332415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2991942790","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2210779,0.42401648,0.05975909,0.027509501,0.107163176,0.0017287361,0.00012852257,0.0008807317,0.15773588],"genre_scores_gemma":[0.93036133,0.05882065,0.00067911093,0.000035491074,0.0016602296,0.000008164073,0.0000020010405,0.00012241483,0.0083106095],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977042,0.00012941894,0.0012676152,0.00009614244,0.00038416023,0.00041846553],"domain_scores_gemma":[0.995831,0.00023358807,0.0021597778,0.000866666,0.00085785956,0.0000510749],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0013031423,0.00037913446,0.0008245094,0.0015004474,0.00046817653,0.00007329215,0.0026406122,0.0012928927,0.00018942465],"category_scores_gemma":[0.00039326373,0.00020715126,0.00027515113,0.000540733,0.0009935191,0.00016329026,0.00012810189,0.0039569675,0.00020622829],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035871024,0.000056091147,0.000098673976,0.00013422084,0.0023166505,0.00008456942,0.00039802233,0.002192719,0.024207603,0.0035808175,0.5400848,0.42648712],"study_design_scores_gemma":[0.0011798749,0.0012775242,0.000058302816,0.00078890845,0.00070866087,0.03084192,0.002859339,0.00018692498,0.06337084,0.013792379,0.88443047,0.0005048765],"about_ca_topic_score_codex":0.0000063586294,"about_ca_topic_score_gemma":0.00004539699,"teacher_disagreement_score":0.7092834,"about_ca_system_score_codex":0.00021526933,"about_ca_system_score_gemma":0.00041820572,"threshold_uncertainty_score":0.99834096},"labels":[],"label_agreement":null},{"id":"W2992543799","doi":"10.1016/j.resconrec.2019.104605","title":"A selective disassembly multi-objective optimization approach for adaptive reuse of building components","year":2019,"lang":"en","type":"article","venue":"Resources Conservation and Recycling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Energy Council of Canada; Consejo Nacional de Ciencia y Tecnología","keywords":"Deconstruction (building); Reuse; Adaptive reuse; Component (thermodynamics); Key (lock); Process (computing); Sustainability; Asset (computer security); Risk analysis (engineering); Resource (disambiguation); Resource efficiency; Computer science; Engineering; Business; Civil engineering","score_opus":0.020639012312985927,"score_gpt":0.22690611816140988,"score_spread":0.20626710584842395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992543799","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5404938,0.000108705695,0.45844305,0.000016551532,0.00009077388,0.00032907556,0.000007127641,0.00006758465,0.0004433511],"genre_scores_gemma":[0.8624394,0.000036181387,0.13733105,0.000021659349,0.000029724391,0.000037382197,0.000025604637,0.0000184999,0.000060492886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993325,0.00003640442,0.00025376835,0.00017641718,0.0000880539,0.00011284494],"domain_scores_gemma":[0.99946856,0.00013068655,0.00010688985,0.00011132869,0.00015033649,0.000032169464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001367548,0.00011542676,0.00018047962,0.00012668593,0.000079397294,0.000026588565,0.000066499524,0.00010225878,0.0000030652025],"category_scores_gemma":[0.00005837746,0.00011163078,0.00004707219,0.00018517536,0.000036311503,0.00016628252,0.000016520074,0.00009244924,3.3916558e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000272801,0.00006642201,0.026363716,0.00031814634,0.00021534241,9.8070494e-8,0.0047668717,0.8692128,0.090950795,0.0023569835,0.0000564314,0.005419567],"study_design_scores_gemma":[0.0007506878,0.00004525273,0.003923121,0.00008035664,0.000020531104,0.0000026498853,0.0010945982,0.98672056,0.0070434813,0.000064068634,0.00012405311,0.00013066323],"about_ca_topic_score_codex":0.000035302386,"about_ca_topic_score_gemma":0.0000040450095,"teacher_disagreement_score":0.3219456,"about_ca_system_score_codex":0.00004245729,"about_ca_system_score_gemma":0.000009828603,"threshold_uncertainty_score":0.45521712},"labels":[],"label_agreement":null},{"id":"W2993309745","doi":"","title":"Architecture of a Distributed, Model-Based Asset Management System","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Asset management; Architecture; Business; Finance; Geography","score_opus":0.00545467557402318,"score_gpt":0.1830666826185672,"score_spread":0.17761200704454402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2993309745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016549855,0.000018457396,0.94329476,0.00002504617,0.00008470004,0.00006520002,0.000019520305,0.0002223621,0.03972011],"genre_scores_gemma":[0.99247074,0.0000028525,0.007313233,0.000008027684,0.00001166224,0.00001353146,0.000024663465,0.000005740201,0.00014953698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970496,0.000004036808,0.000103480044,0.000052553354,0.000068476154,0.00006648932],"domain_scores_gemma":[0.99984664,0.0000036894767,0.000010464669,0.00010258177,0.000016705904,0.000019903338],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000021374186,0.000054942524,0.000060658782,0.000046555862,0.000011932627,0.0000070805177,0.00004257582,0.000029850986,0.00003510806],"category_scores_gemma":[4.7514231e-7,0.000045974706,0.00002988267,0.00009857188,0.000008501176,0.000018902218,0.0000035082314,0.000039393937,0.000006840345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061722512,0.0000062046433,0.00021097429,0.00014037744,0.000024387244,0.0000022315542,0.000008147097,0.9427445,0.00030096664,0.03515417,0.0009010141,0.020500882],"study_design_scores_gemma":[0.00016688084,0.000005572721,0.0001577781,0.00003098292,0.000012125958,0.000009521208,0.000097070864,0.9949319,0.0014876042,0.00022817086,0.0028114917,0.0000609169],"about_ca_topic_score_codex":0.0000037414375,"about_ca_topic_score_gemma":0.000008016525,"teacher_disagreement_score":0.9759209,"about_ca_system_score_codex":0.000031122607,"about_ca_system_score_gemma":0.000003143812,"threshold_uncertainty_score":0.1874794},"labels":[],"label_agreement":null},{"id":"W2997759392","doi":"10.1007/978-3-030-33570-0_16","title":"The Impact of Digitalization on Processes and Organizational Structures of Architecture and Engineering Firms","year":2019,"lang":"en","type":"book-chapter","venue":"Research for development","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Architecture; Digital transformation; Work (physics); Engineering; Knowledge management; Process management; Business; Organizational structure; Engineering management; Computer science; Management; Mechanical engineering; Geography","score_opus":0.020305853392573164,"score_gpt":0.2692571799490969,"score_spread":0.24895132655652377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2997759392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5562109,0.03856441,0.1524578,0.0005686306,0.0022221666,0.01727692,0.0024325578,0.0007989182,0.22946775],"genre_scores_gemma":[0.9885262,0.0008835134,0.001346467,0.0000013152552,0.00007531333,0.000031358417,0.00019409385,0.00008187406,0.008859819],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993576,0.0000032181556,0.00018361202,0.00010479826,0.00024314,0.000107668966],"domain_scores_gemma":[0.9993124,0.00020848383,0.00003997978,0.00007435843,0.00033488008,0.00002988118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113076174,0.00011945967,0.00012793671,0.00016776148,0.00005938358,0.000035865716,0.000062407176,0.00009697651,0.0000135947685],"category_scores_gemma":[0.00010415957,0.00007859798,0.000018988658,0.00005690094,0.00006153164,0.000031160806,0.000023524653,0.00013108035,4.6804203e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023146883,0.000020226802,0.0010173374,0.007859006,0.0013568464,7.5213643e-7,0.002485838,0.045423888,0.0036551883,0.6683751,0.0023017493,0.2672726],"study_design_scores_gemma":[0.004444537,0.002940155,0.052369364,0.008966957,0.00013858454,0.00017529045,0.0004618493,0.03288263,0.13494772,0.36173174,0.39717484,0.0037663307],"about_ca_topic_score_codex":0.0000012483308,"about_ca_topic_score_gemma":0.000005433129,"teacher_disagreement_score":0.4323154,"about_ca_system_score_codex":0.00006551976,"about_ca_system_score_gemma":0.00024160858,"threshold_uncertainty_score":0.32051325},"labels":[],"label_agreement":null},{"id":"W2998429966","doi":"10.1016/j.autcon.2019.103065","title":"BIM-based decision support system for automated manufacturability check of wood frame assemblies","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Design for manufacturability; Manufacturing engineering; Frame (networking); Automation; Product (mathematics); Process (computing); Factory (object-oriented programming); Building information modeling; Engineering; Software; Systems engineering; Computer science; Mechanical engineering; Operations management","score_opus":0.007398810980768447,"score_gpt":0.23277141251110978,"score_spread":0.22537260153034133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998429966","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89474136,0.000014956297,0.09988428,0.00002473218,0.0022127815,0.0006409201,0.000035198897,0.0013350256,0.0011107399],"genre_scores_gemma":[0.9705727,0.0000022799377,0.02918909,0.0000064837895,0.00003075635,0.00009457033,0.00007810932,0.000020771844,0.000005221351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864006,0.00003913858,0.00069628045,0.00022538935,0.00022787918,0.00017126217],"domain_scores_gemma":[0.9991537,0.00018163059,0.00017897385,0.00026973116,0.00017987868,0.00003613972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002884932,0.00017164633,0.00028433322,0.00039391182,0.000041399784,0.000040738327,0.0000933459,0.00024066232,0.0001387403],"category_scores_gemma":[0.000048122358,0.00017535946,0.00009705866,0.00035699282,0.000055045024,0.0003768319,0.000007189549,0.000118368014,0.000043417796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036237988,0.00012771307,0.07318448,0.004461652,0.00016997608,0.0000012709394,0.00054747163,0.43206143,0.06632254,0.06991178,0.0011032678,0.35174602],"study_design_scores_gemma":[0.0012492869,0.00007038206,0.024339983,0.00019665071,0.000019488041,0.000025125031,0.000718952,0.8912907,0.08051876,0.0010415723,0.00032132692,0.00020772034],"about_ca_topic_score_codex":0.000018605197,"about_ca_topic_score_gemma":0.000017685898,"teacher_disagreement_score":0.45922932,"about_ca_system_score_codex":0.00026418522,"about_ca_system_score_gemma":0.0000733107,"threshold_uncertainty_score":0.7150951},"labels":[],"label_agreement":null},{"id":"W2998899296","doi":"10.1139/cjce-2019-0439","title":"Construction and resource short-term planning using a BIM-based ontological decision support system","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Resource (disambiguation); Process (computing); Resource planning; Term (time); Decision support system; Process management; Knowledge management; Management science; Engineering; Data mining","score_opus":0.018531453945450273,"score_gpt":0.20262093744248025,"score_spread":0.18408948349702997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998899296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4129915,0.00062283344,0.5849829,0.00004176104,0.00062076014,0.000055857694,0.000007440497,0.000080356964,0.0005966345],"genre_scores_gemma":[0.9927224,0.0000024643412,0.0070028277,0.000024943385,0.0002232216,8.733844e-7,0.0000017482115,0.000021168109,3.484861e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992228,0.000010572499,0.00035143617,0.00009380114,0.00011993605,0.00020142467],"domain_scores_gemma":[0.99927706,0.0000367587,0.000046553167,0.000058909824,0.000058216177,0.0005225159],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010594958,0.00013627106,0.00021478132,0.00025494228,0.00006465391,0.00007649278,0.00008257507,0.00010834941,0.000044251738],"category_scores_gemma":[0.000048336675,0.00013675094,0.000058484628,0.00017023055,0.000032311902,0.00015152723,0.0000037309803,0.00028053223,8.9447946e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019233272,0.0000011974926,0.013007816,0.00018278895,0.000054737062,0.00035300996,0.0003422004,0.96616113,0.0046679457,0.0011576775,0.00029257324,0.013759717],"study_design_scores_gemma":[0.00053324865,0.00011776081,0.003451044,0.00071830105,0.00006850368,0.002943628,0.0006668931,0.98173666,0.0010355229,0.0000168698,0.008375012,0.00033658204],"about_ca_topic_score_codex":0.000020931886,"about_ca_topic_score_gemma":0.0006693674,"teacher_disagreement_score":0.5797309,"about_ca_system_score_codex":0.00018401394,"about_ca_system_score_gemma":0.00015175802,"threshold_uncertainty_score":0.55765414},"labels":[],"label_agreement":null},{"id":"W2999206313","doi":"10.1109/iesm45758.2019.8948082","title":"Multi-domain BIM interoperability: queries as data-exchange vectors","year":2019,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Interoperability; Computer science; Domain (mathematical analysis); Data exchange; Field (mathematics); World Wide Web; Software engineering; Database","score_opus":0.03939527235954288,"score_gpt":0.26391631602603605,"score_spread":0.22452104366649317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999206313","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54994935,0.002602866,0.36482537,0.00051436684,0.024197698,0.0016053395,0.0008226183,0.0032152075,0.052267164],"genre_scores_gemma":[0.97639686,0.00039420664,0.018133875,0.000121974175,0.00041824754,0.0001080337,0.0010943585,0.000096033196,0.0032364246],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99879265,0.000046392914,0.000328715,0.00048529558,0.0001526193,0.00019432035],"domain_scores_gemma":[0.9986488,0.00002570195,0.000042406104,0.0011531654,0.00006736271,0.00006255461],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00016554377,0.00031271315,0.00031808362,0.000130254,0.00003356127,0.00013462591,0.000471602,0.00034805122,0.001882284],"category_scores_gemma":[0.000032675853,0.00027159147,0.00008225731,0.00007461884,0.00006962439,0.00020757479,0.00061302504,0.0006019756,0.0006597788],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029219413,0.0006851078,0.055409133,0.015532177,0.0047803125,0.00005790197,0.017380703,0.040917773,0.01794652,0.04975902,0.17507735,0.6221618],"study_design_scores_gemma":[0.0013270145,0.00013226859,0.0051990426,0.0007505978,0.00018194846,0.00007423662,0.005334723,0.395203,0.0057889107,0.004237323,0.57890064,0.0028703215],"about_ca_topic_score_codex":0.0005774126,"about_ca_topic_score_gemma":0.00090840604,"teacher_disagreement_score":0.6192915,"about_ca_system_score_codex":0.00013170218,"about_ca_system_score_gemma":0.00006138816,"threshold_uncertainty_score":0.99997365},"labels":[],"label_agreement":null},{"id":"W2999234604","doi":"10.1016/j.autcon.2020.103083","title":"Automated rigging design for heavy industrial lifts","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; North Carolina Space Grant","keywords":"Modular design; Lift (data mining); Engineering; Offset (computer science); Lifting equipment; Reliability engineering; Computer science; Simulation; Mechanical engineering; Operating system","score_opus":0.04070489391244067,"score_gpt":0.2403540588214327,"score_spread":0.19964916490899204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999234604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1491074,0.0000826197,0.8391375,0.0009788481,0.0028895065,0.0010521535,0.000022144266,0.005642165,0.0010876743],"genre_scores_gemma":[0.9699391,0.000012392615,0.029413331,0.00008343528,0.00033796235,0.0001440705,0.0000392065,0.00002593684,0.000004570283],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990498,0.00006659723,0.00040834403,0.00018117345,0.000121300436,0.00017279714],"domain_scores_gemma":[0.99960536,0.00011078783,0.00007108932,0.00008259684,0.00006472567,0.00006545641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018920863,0.00014101423,0.00016128631,0.00016476044,0.000079439946,0.00006790955,0.000066450884,0.0001848287,0.00006410765],"category_scores_gemma":[0.00014080133,0.00016015659,0.000047021298,0.00043789166,0.00004127836,0.0003967925,0.0000060220445,0.0001573397,0.000032166703],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029892637,0.00002602704,0.0028616632,0.00019709987,0.00010026196,0.0000026132395,0.0015218471,0.34106633,0.01333891,0.020440208,0.020622721,0.59952337],"study_design_scores_gemma":[0.0009673199,0.000043151595,0.00048289064,0.000045597066,0.000012593475,0.000019115561,0.00020679478,0.98381686,0.01066093,0.00083659106,0.002731531,0.00017663554],"about_ca_topic_score_codex":0.0000068093304,"about_ca_topic_score_gemma":0.0000036992767,"teacher_disagreement_score":0.8208317,"about_ca_system_score_codex":0.000113020455,"about_ca_system_score_gemma":0.000052358508,"threshold_uncertainty_score":0.65309966},"labels":[],"label_agreement":null},{"id":"W3000512602","doi":"10.1061/9780784482438.032","title":"The Design of Future Robotic Construction Lab","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Sandbox (software development); Computer science; Construct (python library); Virtual machine; Economic shortage; Automation; Construction engineering; Engineering management; Systems engineering; Software engineering; Engineering; Operating system","score_opus":0.0053662408753958795,"score_gpt":0.17340664180034215,"score_spread":0.16804040092494626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000512602","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09674727,0.00078593363,0.8391539,0.00037553464,0.008260992,0.00042756437,0.0000014352779,0.00041390362,0.053833462],"genre_scores_gemma":[0.99334717,0.00009039439,0.0057631633,0.000008519893,0.000084810155,0.000003914991,7.585531e-7,0.00000595083,0.00069531973],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977046,0.0000104539295,0.00008434858,0.000035090005,0.00004902796,0.00005061952],"domain_scores_gemma":[0.999838,0.000024765259,0.000012637891,0.000086726985,0.000028654345,0.000009230152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042670574,0.000038270115,0.00004406164,0.000015970356,0.000022386868,0.000011109889,0.00003751896,0.000035863322,0.00019857605],"category_scores_gemma":[0.0000018738887,0.000024022067,0.00001705494,0.000065313885,0.00002181501,0.000051098523,0.0000023864495,0.000049273283,0.000060021623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017055396,0.000004747063,0.0019138897,0.000039738872,0.00006727569,1.3981213e-7,0.00013950127,0.21356481,0.025675243,0.5160772,0.0045840307,0.23791637],"study_design_scores_gemma":[0.000977519,0.00014339999,0.0055031837,0.000048911585,0.000050318464,0.00013261838,0.007182562,0.83003086,0.09794233,0.010647127,0.046859995,0.0004811711],"about_ca_topic_score_codex":0.0000021238352,"about_ca_topic_score_gemma":0.0000029427508,"teacher_disagreement_score":0.8965999,"about_ca_system_score_codex":0.000010021639,"about_ca_system_score_gemma":0.000006990937,"threshold_uncertainty_score":0.21742684},"labels":[],"label_agreement":null},{"id":"W3003348403","doi":"10.1002/eng2.12107","title":"Predicting construction labor productivity using lower upper decomposition radial base function neural network","year":2020,"lang":"en","type":"article","venue":"Engineering Reports","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa; Concordia University","funders":"","keywords":"Artificial neural network; Radial basis function; Productivity; Computer science; Function (biology); Productivity model; Artificial intelligence; Engineering; Industrial engineering; Operations research; Economics; Total factor productivity","score_opus":0.006348048161758056,"score_gpt":0.1871221640785342,"score_spread":0.18077411591677614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003348403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8770342,0.00022689422,0.11453834,0.00008680385,0.0067347186,0.00019698433,0.0000041209582,0.001071756,0.000106185915],"genre_scores_gemma":[0.99029696,0.000004614518,0.0069594975,0.000036788402,0.002601188,0.000018335984,0.000025707644,0.000051957948,0.0000049217897],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882984,0.000013705624,0.00039153558,0.0003113851,0.00018449491,0.00026902914],"domain_scores_gemma":[0.9995152,0.000018403503,0.00008670421,0.00017531145,0.00007107168,0.00013335384],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012324637,0.0002170365,0.00018692903,0.000069653004,0.00011032717,0.00006847403,0.00003474849,0.000117477415,0.00005229471],"category_scores_gemma":[0.000066809385,0.0002464395,0.000081140475,0.00037493912,0.000023019313,0.00046926423,0.000015032998,0.000308661,0.000004082205],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021124131,0.0000063104353,0.018723702,0.00005833592,0.0000423486,0.00003620074,0.00006847395,0.939032,0.036383916,0.00018145872,0.0001502027,0.005295931],"study_design_scores_gemma":[0.00015907123,0.000053161883,0.008323372,0.00005600738,0.000066542416,0.00078954676,0.000026031094,0.9813932,0.006461815,0.000050551946,0.0023031402,0.00031757125],"about_ca_topic_score_codex":0.00000947483,"about_ca_topic_score_gemma":0.0000018705508,"teacher_disagreement_score":0.113262795,"about_ca_system_score_codex":0.00010350884,"about_ca_system_score_gemma":0.000023704699,"threshold_uncertainty_score":0.9999988},"labels":[],"label_agreement":null},{"id":"W3003823130","doi":"10.1007/s11356-020-07826-0","title":"Correction to: From legacy pollutants to emerging contaminants: recent inputs from the 2018 conference of EcoBIM network","year":2020,"lang":"en","type":"erratum","venue":"Environmental Science and Pollution Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski","funders":"","keywords":"Mistake; Ecotoxicology; Pollutant; Environmental science; Computer science; Environmental chemistry; Political science; Ecology; Law; Biology; Chemistry","score_opus":0.03156030181129232,"score_gpt":0.2754345219682191,"score_spread":0.24387422015692678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003823130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44271162,0.015104824,0.021055104,0.05627863,0.35798287,0.007918198,0.007926921,0.0006466945,0.09037514],"genre_scores_gemma":[0.9908361,0.003347201,0.0001387687,0.000568591,0.0013705685,0.00003978936,0.00008505775,0.000023138577,0.0035908166],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973898,0.00012641725,0.0003286089,0.00050182623,0.0011748458,0.00047850332],"domain_scores_gemma":[0.9992175,0.00007742374,0.00006343495,0.0003025758,0.000057585145,0.00028147502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006587698,0.00020771388,0.00023507871,0.00015879836,0.0005598999,0.00022511571,0.0004899233,0.00016023894,0.0008465375],"category_scores_gemma":[0.0001769267,0.00017175858,0.00003501809,0.0009859442,0.00061915256,0.00034596122,0.00027121854,0.0008597758,0.00018698968],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038474696,0.000013211105,0.00023576313,0.0000051697352,0.000023273531,0.0000015141038,0.0012843934,0.0004573886,0.026260816,0.000050243874,0.7975022,0.17412755],"study_design_scores_gemma":[0.0001861988,0.0001901823,0.060001392,0.0003764411,0.000018284813,0.0000032560827,0.0021738545,0.009668824,0.005368679,0.00017431602,0.9215072,0.0003313889],"about_ca_topic_score_codex":0.0010156805,"about_ca_topic_score_gemma":0.0007489532,"teacher_disagreement_score":0.54812443,"about_ca_system_score_codex":0.000545673,"about_ca_system_score_gemma":0.00020793638,"threshold_uncertainty_score":0.92689925},"labels":[],"label_agreement":null},{"id":"W3005260446","doi":"10.1016/j.autcon.2020.103076","title":"Chronographical spatiotemporal dynamic 4D planning","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Gantt chart; Building information modeling; Process (computing); Computer science; Schedule; Set (abstract data type); Dimension (graph theory); Project management; Industrial engineering; Simulation modeling; Systems engineering; Software engineering; Simulation; Scheduling (production processes); Engineering","score_opus":0.009941865573041726,"score_gpt":0.22209299910106778,"score_spread":0.21215113352802606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005260446","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7937038,0.000117313015,0.2016766,0.00055383827,0.0008408013,0.00015002307,0.000005081471,0.00095593516,0.001996574],"genre_scores_gemma":[0.9921969,0.000012746502,0.007561349,0.00006434558,0.00008729475,0.000022225304,0.00003856292,0.000014595797,0.0000019471172],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992476,0.000026942254,0.00031848322,0.00015186064,0.00012741033,0.00012768265],"domain_scores_gemma":[0.9997675,0.000017671071,0.00004858759,0.00007770173,0.000030663607,0.000057913214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000053357744,0.000115065486,0.00011857434,0.00017284788,0.0000630401,0.00006173449,0.000056068988,0.00012076189,0.00012968463],"category_scores_gemma":[0.00001878505,0.00013143788,0.000039340805,0.00046382146,0.0000809398,0.00036301982,0.0000068750096,0.00020044888,0.000032477594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047996786,0.000022806491,0.10267747,0.00023684005,0.00007331475,0.000011403009,0.002745756,0.14897577,0.01081517,0.043751564,0.000977318,0.6896646],"study_design_scores_gemma":[0.0003943038,0.000024055658,0.032103106,0.000037282858,0.000006692372,0.00003603213,0.00042452718,0.96340054,0.00106414,0.001270453,0.0010622719,0.00017656451],"about_ca_topic_score_codex":0.0000084578105,"about_ca_topic_score_gemma":0.0000136122235,"teacher_disagreement_score":0.8144248,"about_ca_system_score_codex":0.000076785676,"about_ca_system_score_gemma":0.000025991714,"threshold_uncertainty_score":0.5359881},"labels":[],"label_agreement":null},{"id":"W3006990853","doi":"10.1007/s42524-019-0086-4","title":"Investigating the challenges related to combining BIM and Last Planner System on construction sites","year":2020,"lang":"en","type":"article","venue":"Frontiers of Engineering Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Planner; Lean construction; Work (physics); Plan (archaeology); Process management; Action plan; Productivity; Building information modeling; Action research; Computer science; Control (management); Action (physics); Engineering management; Service (business); Resistance (ecology); Production (economics); Knowledge management; Construction industry; Business; Risk analysis (engineering); Operations management; Construction engineering; Engineering; Marketing; Management","score_opus":0.009420885512817783,"score_gpt":0.16841130426798936,"score_spread":0.1589904187551716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006990853","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79132664,0.0059418944,0.17014857,0.003955806,0.0045992187,0.0012987569,0.000021364902,0.0022699498,0.02043782],"genre_scores_gemma":[0.9892961,0.00007649209,0.010509596,0.000031580134,0.00003435839,0.00002195988,0.0000030796903,0.000019875479,0.0000070082015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994519,0.000009415831,0.00018730693,0.00013045523,0.00010952685,0.00011142599],"domain_scores_gemma":[0.99977744,0.00001535129,0.000029514664,0.00009850878,0.0000147898345,0.00006437996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007079408,0.000119241224,0.00012926178,0.00009869219,0.000040421994,0.000022909404,0.00007691188,0.000039260558,0.0000012443329],"category_scores_gemma":[0.000013970092,0.00010370254,0.000022914102,0.0001572243,0.000023885761,0.000057087276,0.000025809346,0.00011201043,0.000004396839],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008037392,0.0000042478173,0.00087549887,0.0006438111,0.00031434686,0.000003100587,0.0018302789,0.6859407,0.0010067226,0.28181028,0.004420323,0.023142653],"study_design_scores_gemma":[0.00071565295,0.0001822553,0.0063024466,0.0005879205,0.0001054844,0.000015413529,0.016419329,0.961934,0.0023935789,0.00025751462,0.010617931,0.0004685009],"about_ca_topic_score_codex":8.351617e-7,"about_ca_topic_score_gemma":3.9079342e-7,"teacher_disagreement_score":0.28155276,"about_ca_system_score_codex":0.000031285697,"about_ca_system_score_gemma":0.0000014098764,"threshold_uncertainty_score":0.4228867},"labels":[],"label_agreement":null},{"id":"W3007839499","doi":"10.1109/wsc40007.2019.9004896","title":"On-site Assembly of Modular Building Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Prefabrication; Discrete event simulation; Computer science; Modular construction; Factory (object-oriented programming); Process (computing); Event (particle physics); Quality (philosophy); Simulation modeling; Systems engineering; Industrial engineering; Engineering; Simulation; Civil engineering","score_opus":0.008816264278268217,"score_gpt":0.2456691707494386,"score_spread":0.23685290647117038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007839499","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6389681,0.000010504023,0.35880813,0.0000032293894,0.0002078255,0.000049500995,0.0000011086031,0.000047114594,0.0019044651],"genre_scores_gemma":[0.9964235,9.397473e-7,0.003450486,0.000007706907,0.000023756655,8.733069e-7,0.000002468261,0.000009836765,0.00008043904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996361,0.000006673348,0.00012972538,0.00006839898,0.00009310726,0.00006597279],"domain_scores_gemma":[0.99981433,0.000022072916,0.000021830218,0.00009939006,0.000026697753,0.000015669224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000039429357,0.00005903196,0.00007220415,0.00006122581,0.000013361249,0.000010118783,0.000026114405,0.00003939219,0.0001236618],"category_scores_gemma":[0.0000043745845,0.000053095104,0.00003699208,0.00007593437,0.000004520147,0.000118315336,0.0000049167093,0.000046433855,0.000023516895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024104265,0.0000017068037,0.00047163613,0.000012127719,0.000007975714,5.217048e-8,0.000020627482,0.8494409,0.13055958,0.017732421,0.0000036753888,0.0017468958],"study_design_scores_gemma":[0.000101745565,0.000013331329,0.00078661705,0.000031729614,0.0000050082026,7.044401e-7,0.000019239507,0.95935184,0.038971435,0.0005497979,0.000106443345,0.00006209263],"about_ca_topic_score_codex":0.000015053655,"about_ca_topic_score_gemma":0.0000019457325,"teacher_disagreement_score":0.35745537,"about_ca_system_score_codex":0.000034841392,"about_ca_system_score_gemma":0.0000040447185,"threshold_uncertainty_score":0.21651556},"labels":[],"label_agreement":null},{"id":"W3009200285","doi":"10.1108/ecam-04-2019-0222","title":"Revolutionising cost structure for integrated project delivery: a BIM-based solution","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Activity-based costing; Integrated project delivery; Building information modeling; Computer science; Estimation; Risk analysis (engineering); Work breakdown structure; Profit (economics); Project management; Reliability engineering; Systems engineering; Operations research; Operations management; Project planning; Engineering; Business; Scheduling (production processes)","score_opus":0.011215618689256033,"score_gpt":0.1998241615331839,"score_spread":0.1886085428439279,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009200285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03898685,0.00015739181,0.9556192,0.0005139342,0.001363958,0.0013839334,0.000109786175,0.0015421716,0.00032274038],"genre_scores_gemma":[0.8197186,0.000013936408,0.1794609,0.000099656456,0.00027238892,0.00019274028,0.00017430792,0.000055843775,0.00001161039],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986742,0.000021504185,0.00037882267,0.00035162413,0.00020319576,0.00037066228],"domain_scores_gemma":[0.9995303,0.000033645247,0.00006179451,0.00017519013,0.00008968608,0.0001093582],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000059757087,0.0003343855,0.00023406606,0.00031429928,0.0001696827,0.00010933976,0.00015314133,0.000105589,0.00006543418],"category_scores_gemma":[0.000028941962,0.00033914082,0.00013774614,0.000613457,0.00006464814,0.00017154275,0.000025845327,0.00029813874,0.000007739296],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009676686,0.000006076346,0.000068864145,0.0005352798,0.00016857087,0.000003051595,0.00015162647,0.62158614,0.009522766,0.013161039,0.0011267182,0.3535731],"study_design_scores_gemma":[0.0009913193,0.000071857394,0.00034205546,0.00009307252,0.00008419874,0.00004548817,0.00017875624,0.94675606,0.0050285747,0.00029144218,0.045661032,0.00045612507],"about_ca_topic_score_codex":0.000011670112,"about_ca_topic_score_gemma":0.000010044453,"teacher_disagreement_score":0.78073174,"about_ca_system_score_codex":0.00023638188,"about_ca_system_score_gemma":0.000038908704,"threshold_uncertainty_score":0.99990606},"labels":[],"label_agreement":null},{"id":"W3009442424","doi":"10.1061/(asce)co.1943-7862.0001826","title":"Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Monte Carlo method; Crew; Fuzzy logic; Computer science; Scope (computer science); Industrial engineering; Artificial intelligence; Engineering; Mathematics; Statistics","score_opus":0.00796218826544233,"score_gpt":0.18291965233514895,"score_spread":0.17495746406970664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009442424","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70902866,0.00050037046,0.2875235,0.00013117888,0.0015124062,0.00015637054,0.0000047556177,0.00012821684,0.001014521],"genre_scores_gemma":[0.98466665,0.00040542023,0.014747393,0.000020264111,0.00013567219,0.000002961355,0.0000010301408,0.000014833087,0.0000057882303],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991223,0.000010675447,0.0004746595,0.00008853131,0.00019797002,0.000105829466],"domain_scores_gemma":[0.9995353,0.000018321236,0.00016665443,0.000071034774,0.000120842844,0.00008781143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009016097,0.0001354453,0.00020752155,0.00022333577,0.00003394379,0.000026092252,0.000058376103,0.00005781479,0.000014378937],"category_scores_gemma":[0.000011645025,0.00013681679,0.000073594296,0.00021227979,0.000047366284,0.0002529278,0.0000094357365,0.00015237324,0.0000012457015],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029530234,0.0000042169586,0.0004794563,0.0003795166,0.00009685088,0.0000025051543,0.000066413675,0.91260934,0.0008570845,0.0013280362,0.000051021685,0.08409601],"study_design_scores_gemma":[0.0008903573,0.000120795165,0.0021738764,0.00017460815,0.0001203392,0.000090839116,0.00033374707,0.9869882,0.0027997831,0.000033844146,0.0061018397,0.00017175787],"about_ca_topic_score_codex":8.963233e-7,"about_ca_topic_score_gemma":1.997693e-7,"teacher_disagreement_score":0.27563798,"about_ca_system_score_codex":0.000043207197,"about_ca_system_score_gemma":0.000011879952,"threshold_uncertainty_score":0.55792266},"labels":[],"label_agreement":null},{"id":"W3010695679","doi":"10.5267/j.ijdns.2019.12.001","title":"Ranking of building maintenance contractors using multi-criteria decision making methods and an artificial neural network model","year":2020,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Ranking (information retrieval); Computer science; Artificial intelligence; Decision model; Machine learning","score_opus":0.09401472220213036,"score_gpt":0.40928366360032864,"score_spread":0.3152689413981983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3010695679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39668983,0.0003035788,0.602169,0.00003840003,0.0007548306,0.000022049335,0.000009807183,0.0000070984365,0.0000054404595],"genre_scores_gemma":[0.62936825,0.0000685119,0.37000564,0.000056789308,0.00049483177,1.2048449e-7,0.0000011322406,0.00000465645,7.962029e-8],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988809,0.00003574847,0.000455089,0.00017405466,0.00029588566,0.00015831263],"domain_scores_gemma":[0.9992617,0.000110146495,0.00021004963,0.00009982215,0.00022732504,0.00009095125],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010445148,0.000091313654,0.00016973972,0.00008102754,0.00010267343,0.00018887546,0.00053289684,0.000034508168,0.000005400558],"category_scores_gemma":[0.00014278514,0.00007947221,0.0000230118,0.00021990403,0.00016706945,0.0016100245,0.00015147177,0.00016828884,3.820627e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011099257,0.000006581739,0.0012978825,0.0000055068326,0.00002488776,0.000005592076,0.00023962857,0.6128974,0.07103561,0.0018387963,0.000043706637,0.3124934],"study_design_scores_gemma":[0.00016257248,0.00002297902,0.000698831,0.00017687061,0.000016220749,0.00010800982,0.00007522639,0.9952824,0.0006820962,0.0026473429,0.000049742444,0.00007769546],"about_ca_topic_score_codex":0.0000023987986,"about_ca_topic_score_gemma":0.0000045227034,"teacher_disagreement_score":0.38238502,"about_ca_system_score_codex":0.000025662699,"about_ca_system_score_gemma":0.00004350044,"threshold_uncertainty_score":0.32407826},"labels":[],"label_agreement":null},{"id":"W3010730395","doi":"10.19255/jmpm02215","title":"Industry 4.0 in Construction Site Logistics: A Comparative Analysis of Research and Practice","year":2020,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Industry 4.0; Business; Construction industry; Supply chain; Supply chain management; Digital transformation; Emerging technologies; Industrial organization; Engineering management; Engineering; Computer science; Marketing; Construction engineering","score_opus":0.12696708095813614,"score_gpt":0.3761409864316774,"score_spread":0.2491739054735413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3010730395","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.770207,0.0012693888,0.19974327,0.0011827092,0.00023415707,0.000499936,0.000015482474,0.0000381386,0.026809925],"genre_scores_gemma":[0.99341637,0.00024483004,0.006251646,0.000030205942,0.00003258053,0.0000035051844,0.0000013955686,0.0000034475008,0.000016001137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991017,0.00009541596,0.00036341092,0.000080139434,0.00027364914,0.00008567683],"domain_scores_gemma":[0.99944675,0.000096449025,0.00013797241,0.00005855581,0.00022696066,0.000033321103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046852315,0.00006229134,0.0002128659,0.00071663613,0.000018331779,0.000029748899,0.00006126701,0.00011379177,0.000010158657],"category_scores_gemma":[0.000053516425,0.000056565605,0.000034858516,0.000992216,0.00007769794,0.00020931903,0.000026554846,0.00076961285,6.969611e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019898403,0.00038259197,0.032588515,0.0010898986,0.010286881,0.00025855922,0.042023897,0.725361,0.0043211435,0.039569058,0.0052727857,0.13685587],"study_design_scores_gemma":[0.0017142642,0.000605113,0.013164254,0.00021714607,0.0014021108,0.00011671104,0.03595681,0.9368545,0.001008839,0.0035297964,0.00516914,0.0002613128],"about_ca_topic_score_codex":0.000019867357,"about_ca_topic_score_gemma":0.000021115891,"teacher_disagreement_score":0.2232094,"about_ca_system_score_codex":0.000063670865,"about_ca_system_score_gemma":0.000019658377,"threshold_uncertainty_score":0.33436275},"labels":[],"label_agreement":null},{"id":"W3011216540","doi":"10.1061/(asce)la.1943-4170.0000391","title":"Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects","year":2020,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Viewpoints; Argument (complex analysis); Computer science; Scope (computer science); Stakeholder; Dispute resolution; Event (particle physics); Risk analysis (engineering); Operations research; Law; Engineering; Business; Political science","score_opus":0.013300325486150347,"score_gpt":0.21569715941777448,"score_spread":0.20239683393162414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011216540","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.953704,0.008917477,0.03686122,0.0000970374,0.000117970514,0.00024890527,0.000011091403,0.000015575331,0.000026718608],"genre_scores_gemma":[0.9929277,0.0035959706,0.0034224605,0.0000057606,0.000024749374,0.0000074153677,0.000007929933,0.000007843804,2.1232405e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894786,0.000047413992,0.00069948024,0.000113638365,0.000099759585,0.00009186464],"domain_scores_gemma":[0.9995,0.00007125637,0.00020372563,0.00004732938,0.00011841393,0.00005931414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028353863,0.000112320995,0.00031930444,0.00032223496,0.000018210158,0.000016131538,0.000028817509,0.0000935131,0.0000010614756],"category_scores_gemma":[0.000059244896,0.0001149198,0.000025385785,0.0005621318,0.00011885188,0.0003588649,0.000009867655,0.00021602132,2.9614174e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016941864,0.00003435383,0.3712649,0.0057640355,0.00007153488,0.0000034763923,0.0011412814,0.5038328,0.0058923173,0.0217242,0.000020870842,0.09008075],"study_design_scores_gemma":[0.001411046,0.00016857033,0.2763422,0.0019472028,0.000071268776,0.0002193769,0.0010525138,0.7169093,0.00085504923,0.00064573926,0.0001164026,0.00026130106],"about_ca_topic_score_codex":0.00008459728,"about_ca_topic_score_gemma":0.00009979518,"teacher_disagreement_score":0.21307646,"about_ca_system_score_codex":0.000044425018,"about_ca_system_score_gemma":0.000040994782,"threshold_uncertainty_score":0.46862933},"labels":[],"label_agreement":null},{"id":"W3011942206","doi":"10.18280/ijsse.100110","title":"Using BIM for the Assessment of the Seismic Performance of Educational Buildings","year":2020,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Comisión Nacional de Investigación Científica y Tecnológica; Pontificia Universidad Católica de Valparaíso; Corporación de Fomento de la Producción","keywords":"Construction engineering; Computer science; Engineering; Forensic engineering","score_opus":0.010560548922388325,"score_gpt":0.24420222333665892,"score_spread":0.23364167441427058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011942206","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7997245,0.00045769298,0.19591536,0.0024462123,0.001271372,0.00008138504,0.0000274349,0.000005526913,0.00007050249],"genre_scores_gemma":[0.9967118,0.00025133637,0.0027651908,0.000033738506,0.00022902989,9.908525e-7,8.305148e-7,0.000005744694,0.0000013765464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943656,0.0000046584464,0.00030373046,0.000035036337,0.00017331717,0.000046710553],"domain_scores_gemma":[0.9995132,0.00011287468,0.00012285452,0.000034566037,0.00019444471,0.000022024202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011608855,0.00005712829,0.000095386175,0.000041981097,0.000027573788,0.000011231621,0.00017222461,0.000025990874,0.000013094552],"category_scores_gemma":[0.000040384843,0.000038984817,0.000073344585,0.00007018293,0.0000275501,0.00013177951,0.000018357716,0.00013601038,3.863841e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039243874,0.000010211109,0.0030670415,0.00011826235,0.00020689062,1.08120084e-7,0.00062858505,0.95649695,0.010694751,0.02520758,0.000036583653,0.0034937637],"study_design_scores_gemma":[0.00024011721,0.00002356262,0.006979252,0.000107538835,0.000025140682,0.000042752563,0.00009644629,0.9852614,0.004597969,0.00017452441,0.002407752,0.000043543674],"about_ca_topic_score_codex":0.0000027573112,"about_ca_topic_score_gemma":4.615198e-7,"teacher_disagreement_score":0.19698724,"about_ca_system_score_codex":0.000037656577,"about_ca_system_score_gemma":0.000044177006,"threshold_uncertainty_score":0.15897547},"labels":[],"label_agreement":null},{"id":"W3013060269","doi":"10.1016/j.autcon.2020.103175","title":"Evaluating industrial modularization strategies: Local vs. overseas fabrication","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Modular programming; Modular design; Quality (philosophy); Automation; Fabrication; Engineering; Manufacturing engineering; Systems engineering; Outsourcing; Computer science; Mechanical engineering; Business","score_opus":0.04111430657511869,"score_gpt":0.26990582990104506,"score_spread":0.22879152332592637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013060269","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.285211,0.00003246772,0.70845467,0.00039811843,0.0014185498,0.0003783175,0.000008446455,0.0009065708,0.003191881],"genre_scores_gemma":[0.9946516,0.0000137655,0.0047214758,0.0000909544,0.0003410283,0.000052882253,0.00010266973,0.000021207972,0.0000044118033],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987183,0.0000865244,0.00050236937,0.00024003247,0.00028923788,0.00016348774],"domain_scores_gemma":[0.9995145,0.00003480037,0.000115375005,0.0001238161,0.00013951531,0.00007199782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015603172,0.00016127831,0.00015815074,0.00018056997,0.00008104283,0.00011645517,0.00007993187,0.00021620437,0.00022208357],"category_scores_gemma":[0.00011186844,0.00019063443,0.000043276097,0.0007278312,0.00007710871,0.0013525255,0.000010777879,0.00025684285,0.00005238831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041940195,0.0000110716755,0.0036250239,0.00005653901,0.000024119472,8.0417243e-7,0.0005867889,0.44191208,0.0072756778,0.05380156,0.00042359467,0.4922408],"study_design_scores_gemma":[0.0008161541,0.000055916298,0.004056443,0.000035180467,0.000016511622,0.000012728515,0.0015163621,0.9884033,0.0022496441,0.0018121002,0.00082719774,0.0001984139],"about_ca_topic_score_codex":0.000023969138,"about_ca_topic_score_gemma":0.000009535085,"teacher_disagreement_score":0.70944065,"about_ca_system_score_codex":0.00022512754,"about_ca_system_score_gemma":0.0001084468,"threshold_uncertainty_score":0.77738464},"labels":[],"label_agreement":null},{"id":"W30149090","doi":"10.1016/j.plipres.2018.08.002","title":"Tulsa office buildings | Paradigm Realty Advisors","year":2014,"lang":"en","type":"article","venue":"Progress in Lipid Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Diabetes and Digestive and Kidney Diseases; Canadian Institutes of Health Research; National Institutes of Health; Natural Sciences and Engineering Research Council of Canada; Naito Foundation","keywords":"Architectural engineering; Business; Public relations; Engineering; Political science","score_opus":0.027709718706184782,"score_gpt":0.32079063347113784,"score_spread":0.29308091476495307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W30149090","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9026054,0.003397576,0.0064854803,0.002385947,0.002722611,0.0010557818,0.000010479383,0.0011116196,0.080225095],"genre_scores_gemma":[0.9976603,0.00015101251,0.0013386775,0.000011063374,0.0004641673,0.0001670412,0.0000065171075,0.00002783767,0.00017339808],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984907,0.00015533269,0.00023230424,0.00022355,0.00042976532,0.000468333],"domain_scores_gemma":[0.9993823,0.00014155793,0.000016853128,0.00026537923,0.000094897994,0.000098971694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011716023,0.00011005303,0.00013603564,0.00033024146,0.00009906808,0.00008796621,0.00025424408,0.00013109283,0.00009543995],"category_scores_gemma":[0.00010449894,0.00010283875,0.000032108164,0.00064568646,0.0002148585,0.0001618494,0.00004383252,0.0006724547,0.00013562433],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049262107,0.00005986459,0.04426042,0.0002024743,0.00001849822,0.000002866443,0.00043081827,0.000630979,0.00027200798,0.09118675,0.006674795,0.85621125],"study_design_scores_gemma":[0.0010125188,0.00021658115,0.0380501,0.00029268413,0.0000056718122,0.000030666408,0.00026836846,0.099413596,0.006307311,0.0072825933,0.8466032,0.0005166874],"about_ca_topic_score_codex":0.000025816016,"about_ca_topic_score_gemma":0.000045740446,"teacher_disagreement_score":0.8556946,"about_ca_system_score_codex":0.00009664199,"about_ca_system_score_gemma":0.00002831757,"threshold_uncertainty_score":0.41936424},"labels":[],"label_agreement":null},{"id":"W3016837706","doi":"10.1061/(asce)co.1943-7862.0001854","title":"Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Fuzzy logic; Construction management; Computer science; Face (sociological concept); Management science; Engineering management; Construction industry; Systems engineering; Construction engineering; Engineering; Artificial intelligence","score_opus":0.0070153483480315075,"score_gpt":0.18949988606198395,"score_spread":0.18248453771395245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016837706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08583883,0.0026928657,0.9051033,0.00086719595,0.0018885471,0.00085607276,0.000016950067,0.0005754132,0.0021608083],"genre_scores_gemma":[0.690496,0.009971118,0.29883423,0.000100362755,0.00045255502,0.000060489445,0.0000049695996,0.00005464648,0.00002559813],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99906504,0.0000071296345,0.00042796653,0.00017837017,0.00014179068,0.00017968893],"domain_scores_gemma":[0.9995872,0.000021792883,0.000103773324,0.00007490968,0.000066067056,0.00014626831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014085585,0.00022143712,0.00026323835,0.0003046128,0.000064485,0.00009884509,0.000059641803,0.000063003456,0.0000034989937],"category_scores_gemma":[0.000011689648,0.00022418659,0.00005186728,0.00013502315,0.00005641672,0.00027737877,0.000035815872,0.00017193722,4.3944803e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007550732,0.000012982238,0.00015205081,0.003166644,0.0006908957,0.00004921635,0.00015916265,0.021764608,0.0061535677,0.22674826,0.00091624155,0.7401109],"study_design_scores_gemma":[0.009409704,0.0016948422,0.0049467315,0.002311776,0.0022613786,0.015528189,0.0046351417,0.33634916,0.033658512,0.016857913,0.5688921,0.0034545367],"about_ca_topic_score_codex":5.256836e-7,"about_ca_topic_score_gemma":1.4949516e-7,"teacher_disagreement_score":0.7366563,"about_ca_system_score_codex":0.00004352331,"about_ca_system_score_gemma":0.0000040961927,"threshold_uncertainty_score":0.9142064},"labels":[],"label_agreement":null},{"id":"W3018138076","doi":"10.1080/15623599.2020.1756028","title":"Construction workspace management: critical review and roadmap","year":2020,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Interdependence; Computer science; Task (project management); Space (punctuation); Process management; Work (physics); Scheduling (production processes); Management science; Construction engineering; Systems engineering; Operations management; Engineering; Artificial intelligence; Sociology","score_opus":0.01092682600490038,"score_gpt":0.2418711242796373,"score_spread":0.23094429827473692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018138076","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011060839,0.037276223,0.7691679,0.06535408,0.019567957,0.0011526037,0.00005554432,0.00066214154,0.09570269],"genre_scores_gemma":[0.6705093,0.09715434,0.22454157,0.005373003,0.0021053627,0.00004107491,0.000025192221,0.000053924265,0.0001962197],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988114,0.000029938938,0.00052138726,0.00013647752,0.0003864805,0.00011428108],"domain_scores_gemma":[0.9993729,0.000024688381,0.00014283246,0.00006444633,0.00026956914,0.00012556136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011889189,0.000145647,0.00020282863,0.00015220298,0.00004119028,0.0000962064,0.00018883552,0.00004734808,0.00038202733],"category_scores_gemma":[0.000013492032,0.00013178015,0.00008730494,0.00018437482,0.00011618527,0.0004121764,0.00004640551,0.00020360843,0.000018061988],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004816081,0.000013823004,0.0005667062,0.0006078385,0.0009388395,0.00007819811,0.000053178712,0.000428472,0.000090807145,0.1983223,0.007272227,0.7915794],"study_design_scores_gemma":[0.005847253,0.0003719696,0.007449772,0.0057762284,0.0040289517,0.011406864,0.007222536,0.011032583,0.001375496,0.036105134,0.90755177,0.0018314422],"about_ca_topic_score_codex":4.5655247e-7,"about_ca_topic_score_gemma":4.3669743e-7,"teacher_disagreement_score":0.9002795,"about_ca_system_score_codex":0.00006944291,"about_ca_system_score_gemma":0.000006642722,"threshold_uncertainty_score":0.53738385},"labels":[],"label_agreement":null},{"id":"W3020815684","doi":"10.1016/j.promfg.2020.02.215","title":"Towards Sustainable Building Design: The Impact of Architectural Design Features on Cooling Energy Consumption and Cost in Saudi Arabia","year":2020,"lang":"en","type":"article","venue":"Procedia Manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy consumption; Architectural engineering; Key (lock); Engineering; Architectural design; Process (computing); Systems engineering; Design process; Building design; Computer science; Architecture; Operations management; Work in process","score_opus":0.02231019897234563,"score_gpt":0.24295533750427012,"score_spread":0.2206451385319245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020815684","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81887877,0.00060668436,0.17963043,0.000108946086,0.00007085594,0.0003717355,0.000002670826,0.00012843045,0.00020147105],"genre_scores_gemma":[0.99813896,0.000109576795,0.0015564848,0.000035864556,0.00008097797,0.00004672409,0.0000021421604,0.000020378262,0.000008898369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99923235,0.000044376266,0.00019106866,0.00016671134,0.00011387764,0.00025162316],"domain_scores_gemma":[0.9996488,0.00013272179,0.00005025418,0.00007598005,0.000026532722,0.00006571199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013788567,0.00017436898,0.0001675239,0.00011281256,0.00007257783,0.000067497574,0.00009709377,0.00007141414,0.000016016227],"category_scores_gemma":[0.00006835338,0.00012582846,0.000045181612,0.00010115825,0.000045660923,0.00014160646,0.000023987295,0.00024849543,8.088077e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000280902,0.000007302652,0.000403286,0.00023628918,0.000050298782,0.000007254919,0.0016228281,0.85537493,0.012511517,0.00093320693,0.00016822566,0.12840395],"study_design_scores_gemma":[0.00060909544,0.00015937029,0.037350636,0.000121596684,0.000020981619,0.00006574337,0.00036104966,0.1435138,0.8154544,0.0019778507,0.00006893694,0.0002965407],"about_ca_topic_score_codex":0.0001467828,"about_ca_topic_score_gemma":0.000006477798,"teacher_disagreement_score":0.8029429,"about_ca_system_score_codex":0.000106484,"about_ca_system_score_gemma":0.000033949273,"threshold_uncertainty_score":0.5131136},"labels":[],"label_agreement":null},{"id":"W3020990666","doi":"10.1016/j.jobe.2020.101431","title":"Maintenance workflow management in hospitals: An automated multi-agent facility management system","year":2020,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workflow; Schedule; Computerized maintenance management system; Facility management; Computer science; Process management; Unified Modeling Language; Process (computing); Workflow management system; Management system; Risk analysis (engineering); Systems engineering; Operations management; Preventive maintenance; Business; Reliability engineering; Engineering; Database","score_opus":0.009965288480925986,"score_gpt":0.22034915103794434,"score_spread":0.21038386255701835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020990666","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3634579,0.00035914095,0.63400227,0.000055820226,0.0010537617,0.00018547835,0.000004554849,0.00071104267,0.00017005485],"genre_scores_gemma":[0.92427725,0.00007253734,0.07552984,0.000012920163,0.000070812705,0.000009297203,0.0000011177503,0.000019934767,0.00000627727],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891216,0.000014393525,0.0005212504,0.00013167597,0.00020182545,0.0002186786],"domain_scores_gemma":[0.9996288,0.000008235825,0.00007644437,0.00011651757,0.00004120529,0.00012883294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021873707,0.00016618223,0.00023059032,0.00021443664,0.000020844522,0.000055375218,0.00018645672,0.00005437358,0.0000057580614],"category_scores_gemma":[0.00000905261,0.00016297655,0.00007762643,0.00031469495,0.0000069558264,0.00028071678,0.000024734218,0.00023879095,0.000005074061],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011280379,0.0000148192885,0.00033735638,0.0005371017,0.00012589316,0.0001808974,0.00021600386,0.9697706,0.0019767147,0.0009922705,0.00021138949,0.025625663],"study_design_scores_gemma":[0.00064921536,0.00003250152,0.0055289622,0.00042780384,0.000027886155,0.000045626184,0.0005297387,0.99029166,0.0007188717,0.00000497341,0.0015585509,0.00018422186],"about_ca_topic_score_codex":0.0000014783519,"about_ca_topic_score_gemma":6.5415105e-7,"teacher_disagreement_score":0.5608194,"about_ca_system_score_codex":0.00030654945,"about_ca_system_score_gemma":0.000004030937,"threshold_uncertainty_score":0.66459906},"labels":[],"label_agreement":null},{"id":"W3021152059","doi":"10.2478/otmcj-2020-0005","title":"Qualitative analysis of Request For Information to identify design flaws in steel construction projects","year":2020,"lang":"en","type":"article","venue":"Organization Technology and Management in Construction An International Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Context (archaeology); Process (computing); Construction engineering; Implementation; Phase (matter); Construction management; Risk analysis (engineering); Engineering; Software engineering; Civil engineering; Business","score_opus":0.022118449603977755,"score_gpt":0.3127989345497795,"score_spread":0.29068048494580173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021152059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23739573,0.000011804148,0.75990975,0.001258139,0.0005843128,0.00042574952,0.000019679968,0.000114463895,0.0002803842],"genre_scores_gemma":[0.9378196,0.00027953912,0.06157021,0.00017418178,0.00003626275,0.000035942347,0.0000704091,0.000010225619,0.0000036144113],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895716,0.000054500055,0.0005740936,0.00014358165,0.00016652327,0.00010417139],"domain_scores_gemma":[0.9992484,0.000025646643,0.00017132379,0.00006908581,0.00043832228,0.00004723535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026500344,0.00010936153,0.0001837512,0.003102661,0.00005085867,0.00008684032,0.00015893881,0.00012395236,0.000044192504],"category_scores_gemma":[0.00014336231,0.00012433965,0.000026328522,0.0026208104,0.000081722996,0.001016605,0.00002653641,0.00015129366,0.0000028211573],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020757214,0.00005114057,0.035152815,0.000095151896,0.0011014302,0.0000053695594,0.009904429,0.04890124,0.003932135,0.66681623,0.00022751812,0.23360494],"study_design_scores_gemma":[0.015527089,0.0013517848,0.1580061,0.0006350536,0.0016981816,0.00076545705,0.29384446,0.37470663,0.06825646,0.06667689,0.016007774,0.0025240933],"about_ca_topic_score_codex":0.0000032996452,"about_ca_topic_score_gemma":0.00001743309,"teacher_disagreement_score":0.7004239,"about_ca_system_score_codex":0.00012303023,"about_ca_system_score_gemma":0.000024082434,"threshold_uncertainty_score":0.5070424},"labels":[],"label_agreement":null},{"id":"W3022835966","doi":"10.18280/ijsdp.150318","title":"Development and Analysis of Prefabricated Concrete Buildings in Chengdu, China","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities","keywords":"China; Architectural engineering; Civil engineering; Engineering; Forensic engineering; Environmental science; Geography; Archaeology","score_opus":0.010211234676220586,"score_gpt":0.21960844593547585,"score_spread":0.20939721125925526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022835966","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99316365,0.0005742429,0.0056066583,0.00010913614,0.00007649301,0.000037849266,0.0000010572611,0.000011483703,0.00041945145],"genre_scores_gemma":[0.9916165,0.000042761727,0.008237351,0.000031496944,0.000028064502,0.0000013077638,0.000010123578,0.0000053506774,0.000027064409],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99916464,0.000008784323,0.0004535644,0.00007543438,0.00019311356,0.000104451516],"domain_scores_gemma":[0.9995474,0.00002535357,0.00013850552,0.000017490716,0.00021006454,0.00006118323],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019309948,0.00008791709,0.00019917953,0.0005241499,0.000027003007,0.00004264167,0.00009308097,0.00004091118,0.000016339902],"category_scores_gemma":[0.000045344335,0.00008321055,0.000023745055,0.0003408547,0.000018317836,0.0002133757,0.000029573504,0.00013061207,1.8383706e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067206385,0.000028382045,0.5349339,0.00048666974,0.00800017,0.0012587094,0.22959688,0.05246445,0.0070906794,0.011040496,0.0005393799,0.15388821],"study_design_scores_gemma":[0.0025735367,0.00007836329,0.7797523,0.00045354865,0.0002788628,0.0001232336,0.054868754,0.05717855,0.043892544,0.0001982767,0.059936754,0.00066528167],"about_ca_topic_score_codex":0.000005782267,"about_ca_topic_score_gemma":7.8524545e-7,"teacher_disagreement_score":0.24481839,"about_ca_system_score_codex":0.00008264253,"about_ca_system_score_gemma":0.000077506855,"threshold_uncertainty_score":0.33932278},"labels":[],"label_agreement":null},{"id":"W3024415211","doi":"10.1016/j.asoc.2020.106400","title":"Neuro-fuzzy system dynamics technique for modeling construction systems","year":2020,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Probabilistic logic; System dynamics; Fuzzy logic; Neuro-fuzzy; Complex system; Industrial engineering; Fuzzy control system; Reliability engineering; Artificial intelligence; Engineering","score_opus":0.01081686977004623,"score_gpt":0.19088033237968324,"score_spread":0.18006346260963701,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024415211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006479683,0.00005399233,0.98666316,0.00003306068,0.00080681185,0.0006672621,0.000010237572,0.0014547844,0.0038309922],"genre_scores_gemma":[0.97272533,0.0000012806728,0.026739828,0.00003751864,0.0003321074,0.00009268966,0.000025551333,0.00004455245,0.0000011150598],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99910784,0.000010495293,0.00035501475,0.00022366106,0.000103370425,0.00019961665],"domain_scores_gemma":[0.9996322,0.000062351144,0.00006145449,0.000109117835,0.00006487275,0.00007003495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103351456,0.00016291872,0.00020515642,0.000054080927,0.00015295768,0.00008042822,0.00010387076,0.00012279474,7.0173536e-7],"category_scores_gemma":[0.000011660014,0.00018321065,0.000054293734,0.00017212542,0.00001921077,0.000054960994,0.000020670055,0.00019189973,0.000007916369],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075953876,0.0000015538484,0.000022060023,0.0003782517,0.000020821823,4.6193034e-7,0.00010234874,0.81533307,0.007036618,0.1626964,0.00008143271,0.01431941],"study_design_scores_gemma":[0.00018311321,0.0000109158145,7.6034416e-7,0.000052457923,0.000016893166,0.000040692772,0.001191373,0.9968373,0.0011134878,0.00025433765,0.00012484964,0.00017378491],"about_ca_topic_score_codex":0.0000070175874,"about_ca_topic_score_gemma":7.2035664e-7,"teacher_disagreement_score":0.96624565,"about_ca_system_score_codex":0.00012021384,"about_ca_system_score_gemma":0.000015510468,"threshold_uncertainty_score":0.7471114},"labels":[],"label_agreement":null},{"id":"W3027860668","doi":"10.23977/engsm.2019.11001","title":"Numerical Simulation of Construction Process of Large Building Project Based on Discrete Element Method","year":2019,"lang":"en","type":"article","venue":"Engineering Solid Mechanics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Vibration; Structural engineering; Discrete element method; Process (computing); Engineering; Finite element method; Aggregate (composite); Stadium; Mechanical engineering; Materials science; Computer science; Composite material","score_opus":0.006433851530521069,"score_gpt":0.2749914713416064,"score_spread":0.26855761981108534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3027860668","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037065487,0.000019767103,0.96167004,0.0000046427617,0.00062654,0.00028238387,0.000017666316,0.00016372414,0.00014973515],"genre_scores_gemma":[0.9656759,0.0000028964216,0.034212198,0.000004785641,0.00003729632,0.000020128848,0.000011923641,0.000031408734,0.000003493477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990918,0.00001700294,0.00034805943,0.00014677472,0.00022563354,0.0001707392],"domain_scores_gemma":[0.9995604,0.00006537486,0.00008894651,0.00017258422,0.00008480336,0.000027854241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001967993,0.00015055877,0.00024131901,0.00021136958,0.000015487052,0.000007921157,0.000074118856,0.00009546823,0.0000389463],"category_scores_gemma":[0.000039298717,0.00015299942,0.00007482443,0.0003010156,0.000003410299,0.00009657905,0.0000065625713,0.00015130777,0.0000021409267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014990658,0.000012741441,0.000032915115,0.00029255613,0.000025669908,1.3174692e-7,0.00008468512,0.96168965,0.02198051,0.0137511315,0.0000025370223,0.0021125074],"study_design_scores_gemma":[0.00029946203,0.00008242783,0.000012324004,0.00011605935,0.000015646521,0.000001688907,0.00007339755,0.8443987,0.1545417,0.00011292609,0.0002249763,0.00012071721],"about_ca_topic_score_codex":0.0000019143915,"about_ca_topic_score_gemma":1.9600925e-7,"teacher_disagreement_score":0.9286104,"about_ca_system_score_codex":0.00005998112,"about_ca_system_score_gemma":0.000028324572,"threshold_uncertainty_score":0.6239135},"labels":[],"label_agreement":null},{"id":"W3029097617","doi":"10.1108/ecam-01-2020-0017","title":"BIM-based life-cycle environmental assessment of prefabricated buildings","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Prefabrication; Building information modeling; Resource consumption; Life-cycle assessment; Apartment; Environmental impact assessment; Architectural engineering; Resource (disambiguation); Engineering; Construction engineering; Civil engineering; Environmental resource management; Computer science; Environmental science; Operations management; Production (economics)","score_opus":0.004704900180745781,"score_gpt":0.1798748500605162,"score_spread":0.17516994987977041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3029097617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49150485,0.0000780171,0.50565326,0.0002457095,0.00049998175,0.00029570388,0.000018635954,0.0006398099,0.0010640296],"genre_scores_gemma":[0.9322077,0.000015198208,0.067543805,0.000056543206,0.00007897252,0.000038285074,0.00002311728,0.000031895113,0.000004474771],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99893624,0.000014825553,0.0003624762,0.0002329298,0.00024147876,0.00021206403],"domain_scores_gemma":[0.9995995,0.000020262685,0.000061880004,0.00016209407,0.000011130433,0.00014512234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004540233,0.00022415144,0.00020347393,0.0001894602,0.000045177618,0.000028257129,0.00014454991,0.000051904164,0.00018791041],"category_scores_gemma":[0.0000072479743,0.00023508182,0.00009989167,0.00028897697,0.00006549358,0.00009329761,0.000037888032,0.00021238739,0.000010845333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000115141975,0.000011168251,0.0011859817,0.00022647619,0.00014946786,0.0000023893847,0.000064673695,0.8988245,0.016703,0.0068738894,0.000043659868,0.07590326],"study_design_scores_gemma":[0.00074697705,0.000071316674,0.020066964,0.000052614556,0.00006645864,0.000017277544,0.00010900057,0.96784526,0.006713749,0.00010166461,0.003849934,0.0003587776],"about_ca_topic_score_codex":0.0000034742081,"about_ca_topic_score_gemma":2.802019e-7,"teacher_disagreement_score":0.4407029,"about_ca_system_score_codex":0.00008736425,"about_ca_system_score_gemma":0.0000099545005,"threshold_uncertainty_score":0.95863587},"labels":[],"label_agreement":null},{"id":"W3030530198","doi":"10.3311/ppar.14655","title":"Enabling Automatic LCA at Any Stage of the Building Based on Its BIM Model","year":2020,"lang":"en","type":"article","venue":"Periodica Polytechnica Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Hôpital Notre-Dame","funders":"Hydro-Québec","keywords":"Building information modeling; Interoperability; Process (computing); Computer science; Information model; Life-cycle assessment; Domain (mathematical analysis); Software engineering; Systems engineering; Process management; Construction engineering; Engineering; Production (economics); World Wide Web; Operations management","score_opus":0.015541562279188641,"score_gpt":0.21904321525177303,"score_spread":0.20350165297258438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3030530198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8089313,0.0004522763,0.17966284,0.0053423913,0.00025749955,0.0006459716,0.00023114553,0.0015175509,0.0029590328],"genre_scores_gemma":[0.99341214,0.000008672282,0.0058151595,0.00056949875,0.0000551421,0.000033621316,0.000004046128,0.00003953598,0.0000621733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998901,0.00003335169,0.00029410474,0.00022405034,0.0003116379,0.00023581616],"domain_scores_gemma":[0.99937487,0.00004781113,0.00007741302,0.00036838482,0.000025375855,0.00010613157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006733314,0.00021219304,0.00021547076,0.00010710445,0.00017740535,0.00003236575,0.0003521983,0.000119267046,0.00020771447],"category_scores_gemma":[0.000090584304,0.00015484955,0.0001616523,0.00039947877,0.000102449565,0.000038997354,0.00007153708,0.00046031678,0.000008270581],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020982123,0.000010732623,0.00006607348,0.00019996871,0.000017389826,0.0000011404749,0.00038817746,0.71915716,0.27013406,0.0013040545,0.00019900074,0.008501284],"study_design_scores_gemma":[0.00020010925,0.000038539318,0.0001601172,0.00008969614,0.000016597858,0.00000606671,0.00002335045,0.8907441,0.104028724,0.00008637281,0.004446659,0.00015965328],"about_ca_topic_score_codex":0.000002729163,"about_ca_topic_score_gemma":0.0000069669804,"teacher_disagreement_score":0.18448086,"about_ca_system_score_codex":0.00007026114,"about_ca_system_score_gemma":0.000064572545,"threshold_uncertainty_score":0.6314581},"labels":[],"label_agreement":null},{"id":"W303161768","doi":"10.5957/jsp.2008.24.4.221","title":"A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipbuilding; Shipyard; Vendor; Naval architecture; Piping; Manufacturing engineering; Productivity; Engineering; Process (computing); Operations research; Computer science; Engineering drawing; Marine engineering; Mechanical engineering","score_opus":0.03919690532133227,"score_gpt":0.22074021172357128,"score_spread":0.181543306402239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W303161768","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44375148,0.000076063574,0.55516267,0.00005691355,0.0007485075,0.00013919358,6.09675e-8,0.000038066915,0.000027049844],"genre_scores_gemma":[0.8165571,0.000007802512,0.18259147,0.00000866917,0.00079351984,0.000005560634,5.090809e-7,0.000012675654,0.00002265772],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991491,0.00004688113,0.00032738972,0.00015724475,0.00019961517,0.000119779346],"domain_scores_gemma":[0.99952084,0.000018015362,0.000109536246,0.00008179416,0.00020162639,0.00006816965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005377664,0.00011391938,0.00014467581,0.00022020441,0.00013775151,0.000033929635,0.00004922934,0.000051304898,0.000001730808],"category_scores_gemma":[0.00006312635,0.00010281956,0.000023491202,0.00018898254,0.000024931192,0.0005533508,0.000011091469,0.00019750594,0.0000021783756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049009603,0.000036781174,0.0008874236,0.000060036433,0.00002960651,0.0000011768245,0.0021623624,0.782101,0.015495658,0.000033142478,0.00029318302,0.19885062],"study_design_scores_gemma":[0.0012262845,0.00053698604,0.08080357,0.00029495807,0.00009296785,0.0047766976,0.0006649262,0.61559755,0.28514317,0.00041949662,0.0093053235,0.0011380719],"about_ca_topic_score_codex":8.779168e-7,"about_ca_topic_score_gemma":3.538564e-7,"teacher_disagreement_score":0.37280566,"about_ca_system_score_codex":0.00013714447,"about_ca_system_score_gemma":0.00004836102,"threshold_uncertainty_score":0.419286},"labels":[],"label_agreement":null},{"id":"W3033110589","doi":"10.1016/j.autcon.2020.103257","title":"Building automation system - BIM integration using a linked data structure","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University; Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Research Foundation","keywords":"Building information modeling; Automation; Systems engineering; Engineering; System integration; Building automation; Computer science; Construction engineering; Manufacturing engineering; Software engineering; Database; Operations management; Mechanical engineering","score_opus":0.030483981159701218,"score_gpt":0.25483156291155845,"score_spread":0.22434758175185723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033110589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4702045,0.00006678576,0.5259746,0.00013904955,0.0014622136,0.0003307821,0.00006725153,0.0014690448,0.00028579545],"genre_scores_gemma":[0.9066363,0.000008336766,0.09264437,0.000037614267,0.0003526144,0.0000144911355,0.0002712134,0.00003419927,8.6459926e-7],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99824995,0.00009733551,0.0007305926,0.00040777106,0.00029620877,0.00021814732],"domain_scores_gemma":[0.9991792,0.000039431998,0.00019315128,0.00038043127,0.00011926208,0.000088528315],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017102993,0.00025241156,0.00025823753,0.0003428931,0.00013365061,0.00017336951,0.00025531786,0.00026607828,0.00007423141],"category_scores_gemma":[0.000090701535,0.00027406923,0.000042298234,0.0009366881,0.00006315985,0.0016356582,0.00004577193,0.0003315845,0.000021549999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041457304,0.000014849252,0.002908139,0.00063329306,0.00009768954,0.000006628048,0.0012254599,0.15960315,0.23390388,0.12695555,0.00039884401,0.47421107],"study_design_scores_gemma":[0.00044238698,0.000014764746,0.0021098852,0.00016920251,0.0000341965,0.00012708236,0.00089454866,0.9890841,0.0057971,0.0007856178,0.0002829902,0.00025808316],"about_ca_topic_score_codex":0.00005118138,"about_ca_topic_score_gemma":0.000036655012,"teacher_disagreement_score":0.829481,"about_ca_system_score_codex":0.00038694232,"about_ca_system_score_gemma":0.00006983471,"threshold_uncertainty_score":0.99997115},"labels":[],"label_agreement":null},{"id":"W3033566057","doi":"10.1108/f-08-2019-0088","title":"Critical lifting simulation of heavy industrial construction in gaming environment","year":2020,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Lifting equipment; Process (computing); Dimension (graph theory); Visualization; Industrial engineering; Engineering; Computer science; Simulation; Systems engineering; Mechanical engineering","score_opus":0.034178894995787336,"score_gpt":0.22130999115793953,"score_spread":0.1871310961621522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033566057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.953767,0.00010222055,0.043602943,0.00016388917,0.0003801494,0.000094040384,0.00004217658,0.000106996085,0.0017406082],"genre_scores_gemma":[0.99938154,0.000006199893,0.00048277547,0.000009011629,0.000095385,0.0000049650193,0.000005995987,0.000004499118,0.0000096331305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950194,0.000024820787,0.00022491065,0.000075363576,0.000091188194,0.00008177954],"domain_scores_gemma":[0.999809,0.000096226715,0.000013964761,0.00004041852,0.000012576983,0.000027784852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052869276,0.00006167126,0.00009573513,0.00003934875,0.00001824311,0.00001123872,0.000023542363,0.00007081821,0.00019260855],"category_scores_gemma":[0.00014941843,0.0000691654,0.00002257102,0.000060365113,0.00006763483,0.00014324638,0.000006935316,0.00011759939,0.000010885849],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007721938,0.000011590864,0.012106573,0.0001575965,0.000017148037,0.0000013744209,0.0051820693,0.8699537,0.0054067285,0.010151875,0.00007224256,0.096861884],"study_design_scores_gemma":[0.00068520225,0.00009099981,0.0014330354,0.0000777344,0.000011756805,0.00000437136,0.011214182,0.9514462,0.025632083,0.001060424,0.008088524,0.000255509],"about_ca_topic_score_codex":0.000013973384,"about_ca_topic_score_gemma":0.0000021729875,"teacher_disagreement_score":0.096606374,"about_ca_system_score_codex":0.000035999914,"about_ca_system_score_gemma":0.000008763826,"threshold_uncertainty_score":0.28204829},"labels":[],"label_agreement":null},{"id":"W3034366985","doi":"10.48550/arxiv.2004.12485","title":"Learning To Navigate The Synthetically Accessible Chemical Space Using\\n Reinforcement Learning","year":2020,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; HEC Montréal","funders":"","keywords":"Reinforcement learning; Space (punctuation); Chemical space; Computer science; Reinforcement; Human–computer interaction; Artificial intelligence; Engineering; Biology; Bioinformatics","score_opus":0.04460590330305823,"score_gpt":0.1891779005994102,"score_spread":0.14457199729635198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034366985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68512833,0.000030130861,0.30576876,0.00020088152,0.00048947684,0.0002518346,0.0000018786977,0.0005209175,0.0076077827],"genre_scores_gemma":[0.99871635,0.000050494124,0.00035556362,0.00005400291,0.00012663146,0.0000019270133,0.000011740482,0.000037545662,0.0006457667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896127,0.00006227088,0.00018606686,0.00043203752,0.00009385501,0.00026449354],"domain_scores_gemma":[0.9993504,0.00004904886,0.00008144218,0.00028326173,0.00008636764,0.00014947056],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001050543,0.00026586725,0.00022669949,0.00008825971,0.00016891166,0.00011835268,0.00044195252,0.00023045161,0.0001301645],"category_scores_gemma":[0.00005919048,0.00025897377,0.00014336305,0.00037054156,0.000075406795,0.00010748301,0.00046472615,0.0013945363,0.00011709675],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020114809,0.000003459001,0.00042151177,0.0000572088,0.000070066446,0.000017500357,0.00030772158,0.98399925,0.004231044,0.010132207,0.00006967844,0.0006702401],"study_design_scores_gemma":[0.00013419944,0.000023780953,0.00004532046,0.00016475703,0.00010538857,0.0000059233553,0.00058666186,0.9881771,0.0052464516,0.0011881404,0.003975299,0.00034697866],"about_ca_topic_score_codex":0.00005436117,"about_ca_topic_score_gemma":0.000004682282,"teacher_disagreement_score":0.313588,"about_ca_system_score_codex":0.00023623307,"about_ca_system_score_gemma":0.00006211743,"threshold_uncertainty_score":0.99998623},"labels":[],"label_agreement":null},{"id":"W3034774777","doi":"10.1108/ci-11-2019-0133","title":"Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies","year":2020,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Workflow; Building information modeling; Workflow technology; Computer science; Workflow engine; Systems engineering; Process (computing); Information flow; Business process; Workflow management system; Process management; Software engineering; Engineering; Database; Operations management; Work in process","score_opus":0.03393388412887537,"score_gpt":0.2387419833636484,"score_spread":0.20480809923477303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034774777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8224196,0.00002203629,0.17332953,0.00039210828,0.0018558721,0.0005183934,0.000104095,0.0010795135,0.00027885402],"genre_scores_gemma":[0.9036163,0.000015537487,0.09564368,0.00014809673,0.0004351957,0.000045563433,0.000049231432,0.000042935866,0.0000034324114],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986213,0.000020470405,0.00051295,0.00040420005,0.0002062289,0.00023489239],"domain_scores_gemma":[0.999233,0.00001762486,0.000150252,0.0001577046,0.00039182097,0.000049617425],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007859196,0.00027557288,0.00023710619,0.00056635967,0.00020743177,0.00018671388,0.00008703458,0.00025247902,0.000037937378],"category_scores_gemma":[0.00015794703,0.0002896629,0.000020846637,0.0014440698,0.00019838182,0.00055636995,0.00003472761,0.00024048929,0.000008948033],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000215398,0.000013711441,0.0032097097,0.00055828673,0.000078272526,0.0000026372832,0.00065518013,0.0075106975,0.6314598,0.03197621,0.00022050181,0.32409963],"study_design_scores_gemma":[0.0011849236,0.00032444185,0.00020654201,0.00033300847,0.00008497331,0.00050942745,0.0065164124,0.14448887,0.8354292,0.007027522,0.0029269939,0.0009677188],"about_ca_topic_score_codex":0.000013331622,"about_ca_topic_score_gemma":0.0000054572324,"teacher_disagreement_score":0.32313192,"about_ca_system_score_codex":0.00014695102,"about_ca_system_score_gemma":0.00011323625,"threshold_uncertainty_score":0.99995553},"labels":[],"label_agreement":null},{"id":"W3035558579","doi":"10.1061/(asce)me.1943-5479.0000815","title":"Fuzzy Agent-Based Multicriteria Decision-Making Model for Analyzing Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Crew; Multiple-criteria decision analysis; Scope (computer science); Process (computing); Computer science; Operations research; Fuzzy logic; Decision support system; Decision-making models; Management science; Risk analysis (engineering); Engineering; Artificial intelligence; Business","score_opus":0.014321942958857596,"score_gpt":0.22967911140850905,"score_spread":0.21535716844965144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035558579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19106643,0.00014796252,0.8078655,0.000042731655,0.00054866145,0.00011485532,0.0000018886924,0.000055083277,0.00015686726],"genre_scores_gemma":[0.7998666,0.00007992095,0.1998887,0.000032856027,0.000101345155,0.000008278333,9.676011e-7,0.000019634304,0.0000016929405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991159,0.0000046004157,0.00047937498,0.00009272826,0.00014806331,0.00015933346],"domain_scores_gemma":[0.9996907,0.000045095112,0.0000837178,0.00006988647,0.000056736913,0.000053862834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001623499,0.00012998597,0.00018160588,0.00032179913,0.000027575052,0.000048607486,0.00012210834,0.000045572837,0.0000082901815],"category_scores_gemma":[0.000033277956,0.00013554588,0.000090179135,0.0002382916,0.00000783971,0.0002981557,0.000012732011,0.00016341981,0.0000015569736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039978735,0.000005066404,0.00031458397,0.00028379518,0.000043176115,0.0000047127696,0.00009259426,0.9017427,0.0006794265,0.00040150937,0.000076864686,0.09631559],"study_design_scores_gemma":[0.0006321212,0.000027676753,0.00043902145,0.00035223286,0.000037391026,0.0000085178035,0.00008609331,0.99749476,0.000349258,0.00010560962,0.00033770918,0.00012960497],"about_ca_topic_score_codex":1.2040645e-7,"about_ca_topic_score_gemma":4.5004364e-7,"teacher_disagreement_score":0.6088002,"about_ca_system_score_codex":0.00010644998,"about_ca_system_score_gemma":0.000008772205,"threshold_uncertainty_score":0.55274004},"labels":[],"label_agreement":null},{"id":"W3035817401","doi":"10.36680/j.itcon.2020.019","title":"Change management practices for adopting new technologies in the design and construction industry","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Change management (ITSM); Context (archaeology); Change order; Business; Order (exchange); Critical success factor; Knowledge management; Best practice; Marketing; Operations management; Process management; Engineering; Computer science; Project management; Program management; Management; OPM3; Economics","score_opus":0.0348342904175412,"score_gpt":0.25000134206153457,"score_spread":0.21516705164399336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035817401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20272772,0.0007521214,0.7686825,0.024561087,0.0010181644,0.0013404379,0.0000039647143,0.00041408086,0.0004999665],"genre_scores_gemma":[0.752006,0.0007161146,0.24701025,0.00012778326,0.000083032195,0.000048007976,0.0000019154515,0.0000061758274,7.1075243e-7],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99911505,0.000022496703,0.0005713948,0.000059403126,0.00011403203,0.000117600466],"domain_scores_gemma":[0.99919814,0.000065085515,0.00056624704,0.000069866954,0.00008238097,0.000018265171],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034475056,0.0001024085,0.00014664905,0.00079763425,0.000048632486,0.00006162735,0.00015059006,0.0003663468,0.0000030365438],"category_scores_gemma":[0.00024598846,0.000084351486,0.000023974731,0.00072424044,0.00011676908,0.0015910694,0.000016236203,0.0006678603,0.0000011342551],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047856774,0.0000036254637,0.0052791876,0.00006931188,0.000022907248,0.0000019442116,0.00079274457,0.0010141727,0.00008898488,0.03060876,0.00015795443,0.9619126],"study_design_scores_gemma":[0.011373003,0.0015254463,0.007856544,0.0012119409,0.0002932865,0.007413216,0.5903031,0.11928527,0.03184792,0.14982148,0.07780089,0.0012678581],"about_ca_topic_score_codex":0.0000026689195,"about_ca_topic_score_gemma":0.0000022331474,"teacher_disagreement_score":0.9606447,"about_ca_system_score_codex":0.000065424545,"about_ca_system_score_gemma":0.000028208471,"threshold_uncertainty_score":0.3439754},"labels":[],"label_agreement":null},{"id":"W3036097659","doi":"10.1520/stp161720190154","title":"Unintended Consequences: A Review of Critical Details, Serviceability, and Durability of Modern High-Performance Facades","year":2020,"lang":"en","type":"review","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intertek (Canada)","funders":"","keywords":"Serviceability (structure); Durability; Unintended consequences; Architectural engineering; Engineering; Computer science; Civil engineering; Political science; Law","score_opus":0.0345478144276214,"score_gpt":0.2888057958446752,"score_spread":0.2542579814170538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036097659","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00004421977,0.99756724,0.00075686054,0.00016319694,0.0001142471,0.00042707732,0.00008220323,0.000091076225,0.00075389026],"genre_scores_gemma":[0.020474728,0.97859347,0.0007975022,0.00003190555,0.000015934487,0.000044120367,0.000019745677,0.000017128968,0.0000054830584],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99836254,0.00010008991,0.0009983195,0.0002476262,0.00016689132,0.00012450777],"domain_scores_gemma":[0.99918777,0.0001456632,0.0001167327,0.00027115157,0.00020376286,0.000074934884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019585725,0.00027120393,0.0015097403,0.000053714666,0.000017218728,0.000008544389,0.0001727034,0.00022005702,0.00019337324],"category_scores_gemma":[0.00016520351,0.00020275831,0.00016107423,0.00025617026,0.00070970017,0.00012492873,0.000041654235,0.00032608936,0.0000048604315],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.726571e-7,0.000006536257,0.0000054498437,0.4216798,0.000039132534,2.6595194e-7,0.00001183619,0.0000012217524,0.0000034642098,0.004931636,0.00001336069,0.57330644],"study_design_scores_gemma":[0.00045405846,0.00035801702,0.00008440472,0.5611436,0.004254533,0.00051896705,0.00016898163,0.014268007,0.0009402823,0.01918453,0.39660695,0.0020177069],"about_ca_topic_score_codex":0.000019558176,"about_ca_topic_score_gemma":0.000008696368,"teacher_disagreement_score":0.5712887,"about_ca_system_score_codex":0.00004725189,"about_ca_system_score_gemma":0.00013061268,"threshold_uncertainty_score":0.82682437},"labels":[],"label_agreement":null},{"id":"W3036302401","doi":"10.1108/jedt-02-2020-0044","title":"BIM-based integrated solution for analysis and management of mismatches during construction","year":2020,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Reliability (semiconductor); Process (computing); Building information modeling; Computer science; Project management; Risk analysis (engineering); Software; Reliability engineering; Engineering; Systems engineering; Operations management","score_opus":0.010150996734554395,"score_gpt":0.18808213663088366,"score_spread":0.17793113989632928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036302401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20445472,0.00045470707,0.79468304,0.00020838679,0.00006580459,0.0000654583,0.0000016097856,0.00006360875,0.0000026878686],"genre_scores_gemma":[0.8143318,0.00018464705,0.18545543,0.00000248836,0.000012949766,0.000004640001,7.560804e-7,0.0000066306816,6.28802e-7],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957633,0.000004460397,0.00024124033,0.00006090211,0.000044890727,0.000072201605],"domain_scores_gemma":[0.9997617,0.000019593035,0.00007358002,0.000037810787,0.00007494764,0.000032361146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006610689,0.00007762016,0.00018968397,0.00046127153,0.000018138393,0.000008952141,0.000038544626,0.00008630816,0.0000023573266],"category_scores_gemma":[0.000014548667,0.000072920026,0.00004100916,0.00050267094,0.000036577698,0.000055337703,0.000005045822,0.000097925586,6.308753e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017353774,0.000025587038,0.0032166818,0.0017690188,0.0030539725,0.0000170025,0.00014694176,0.29911113,0.56352216,0.019258767,0.00007256353,0.109632656],"study_design_scores_gemma":[0.0007895599,0.00015672635,0.0010670442,0.00009872322,0.00045526645,0.000059136102,0.00016984546,0.83464533,0.16188362,0.00033759445,0.00022239493,0.00011477867],"about_ca_topic_score_codex":3.9368018e-7,"about_ca_topic_score_gemma":2.1091371e-7,"teacher_disagreement_score":0.6098771,"about_ca_system_score_codex":0.000017753211,"about_ca_system_score_gemma":0.000006210944,"threshold_uncertainty_score":0.29735923},"labels":[],"label_agreement":null},{"id":"W3037746521","doi":"10.1108/ecam-06-2019-0314","title":"Exploring and verifying BIM-based energy simulation for building operations","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Building information modeling; Energy consumption; Unavailability; Simulation software; Computer science; Process (computing); Systems engineering; Schedule; Building energy simulation; Energy modeling; Software; Reliability engineering; Simulation; Engineering; Energy performance; Operating system","score_opus":0.03669529932917424,"score_gpt":0.21118488170000682,"score_spread":0.1744895823708326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037746521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14482144,0.00008302219,0.8533016,0.0002049649,0.0006144459,0.0002373094,0.0000063555735,0.00063874514,0.00009213737],"genre_scores_gemma":[0.87227756,0.000023365701,0.12718278,0.000059454058,0.00019918826,0.00020757811,0.000015234171,0.000032216896,0.0000026529365],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992084,0.000008861491,0.00024857247,0.00022756068,0.00011029898,0.00019630035],"domain_scores_gemma":[0.99971014,0.000049725368,0.00001918545,0.00009424888,0.000030596457,0.00009611363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004103679,0.00019157749,0.00013531696,0.00019639549,0.00013478087,0.00009368713,0.00006376275,0.00003574447,0.000011688069],"category_scores_gemma":[0.000019511535,0.00021085568,0.000059614857,0.00023449863,0.000026714883,0.0002539347,0.000020725853,0.00010805322,0.0000013607927],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000127506455,0.0000011460392,0.000015385729,0.00012401328,0.000039248946,5.73301e-7,0.00007112415,0.8143005,0.0026483394,0.029926432,0.0000035805533,0.15285693],"study_design_scores_gemma":[0.00060569897,0.00002862042,0.00024434653,0.000044139197,0.000032093292,0.0000075443504,0.00008905851,0.98829985,0.0040024705,0.00012962695,0.0062854425,0.0002311136],"about_ca_topic_score_codex":0.000004185332,"about_ca_topic_score_gemma":0.0000019822146,"teacher_disagreement_score":0.7274561,"about_ca_system_score_codex":0.00005315552,"about_ca_system_score_gemma":0.0000048027287,"threshold_uncertainty_score":0.8598445},"labels":[],"label_agreement":null},{"id":"W3038353914","doi":"10.1177/1478077120934126","title":"Generative systems in the architecture, engineering and construction industry: A systematic review and analysis","year":2020,"lang":"en","type":"review","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"LEAPS; Architecture; Generative grammar; Generative Design; Systems engineering; Engineering; Engineering management; Computer science; Software engineering; Management science; Artificial intelligence; Operations management; Business","score_opus":0.013808157388896325,"score_gpt":0.2622755155685924,"score_spread":0.2484673581796961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3038353914","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002251567,0.98815405,0.010487358,0.00014400845,0.0004930178,0.00043584662,0.000016439037,0.00002298267,0.000021154437],"genre_scores_gemma":[0.0053250906,0.9924519,0.0017098377,0.00006714533,0.00039538767,0.000013891313,0.000013836912,0.000021668158,0.0000012243847],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.998041,0.00025210404,0.0011230323,0.00014674423,0.0003179922,0.000119129276],"domain_scores_gemma":[0.9988301,0.00036151163,0.0005488069,0.000087569,0.00011323844,0.000058803755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004354627,0.0002840121,0.0014712709,0.00066790864,0.00003293009,0.00019352367,0.00032046126,0.00013664448,0.0000018841816],"category_scores_gemma":[0.0001595226,0.00017623442,0.0002559211,0.0005516115,0.00004349918,0.00007124259,0.000045722172,0.0013063188,4.2417997e-7],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045328293,0.000006923383,0.000027787293,0.3196043,0.006537366,0.000119045144,0.0011913326,0.028281309,0.0000025322242,0.0015017282,0.000021768208,0.6427014],"study_design_scores_gemma":[0.00063340866,0.00014622271,0.00008357545,0.7318964,0.023857336,0.05878901,0.00059236184,0.14402491,0.0000019877143,0.00024101588,0.03847677,0.0012570089],"about_ca_topic_score_codex":0.0000061692263,"about_ca_topic_score_gemma":0.0000028138156,"teacher_disagreement_score":0.6414444,"about_ca_system_score_codex":0.00009901053,"about_ca_system_score_gemma":0.000038089773,"threshold_uncertainty_score":0.7186631},"labels":[],"label_agreement":null},{"id":"W3039556242","doi":"10.1108/ecam-01-2019-0069","title":"A decision support tool for planning module installation in industrial construction","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Plan (archaeology); Heuristic; Swing; Systems engineering; Engineering; Computer science; Industrial engineering; Operations research; Mechanical engineering","score_opus":0.015953008632236886,"score_gpt":0.2118610136929956,"score_spread":0.1959080050607587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039556242","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4254545,0.000035877056,0.57052743,0.00013738303,0.0018993665,0.0006693862,0.000015712545,0.0005799144,0.00068043906],"genre_scores_gemma":[0.903357,0.0000126853065,0.09598414,0.000040360967,0.00036768973,0.00013404725,0.00005278569,0.000040173865,0.000011078396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986208,0.000014073823,0.0005202613,0.0003240543,0.00021504579,0.00030578315],"domain_scores_gemma":[0.9996208,0.000054626144,0.000060102488,0.00013871989,0.000034167224,0.0000915806],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010920712,0.00026412582,0.00023503536,0.00038243816,0.00007315937,0.00008137844,0.00011653553,0.00012730485,0.000061454804],"category_scores_gemma":[0.000045637156,0.00029262828,0.000096004216,0.00047725948,0.000041386593,0.00026659126,0.000034845118,0.00030335443,0.000011474418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008213044,0.000003426312,0.0010457711,0.000089910835,0.000045783752,0.0000038037588,0.00018498069,0.5607569,0.0008042082,0.0062483405,0.00014210188,0.4305926],"study_design_scores_gemma":[0.003943417,0.00017480833,0.0062875426,0.0002813292,0.00006521936,0.00016807955,0.0004939988,0.9583103,0.0024897184,0.0017192038,0.025208673,0.0008576748],"about_ca_topic_score_codex":0.0000026300513,"about_ca_topic_score_gemma":0.00000226492,"teacher_disagreement_score":0.47790256,"about_ca_system_score_codex":0.00015347192,"about_ca_system_score_gemma":0.000014194705,"threshold_uncertainty_score":0.9999526},"labels":[],"label_agreement":null},{"id":"W3039813675","doi":"10.1108/jfm-04-2020-0024","title":"Information commissioning: bridging the gap between digital and physical built assets","year":2020,"lang":"en","type":"article","venue":"Journal of Facilities Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Project commissioning; Asset (computer security); Computer science; Process management; Building information modeling; Bridging (networking); Process (computing); Information system; Originality; Information model; Risk analysis (engineering); Business; Operations management; Publishing; Engineering; Computer security","score_opus":0.018364757950286935,"score_gpt":0.2147569941793794,"score_spread":0.19639223622909247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039813675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9129299,0.00011820567,0.06977824,0.0030568098,0.00024497972,0.00011452513,0.000043093263,0.00006566997,0.013648579],"genre_scores_gemma":[0.9996253,0.00002247136,0.00007636969,0.000052576896,0.00014855141,9.3100135e-7,0.0000030948263,0.0000025185511,0.000068156565],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995492,0.0000074707286,0.00019646056,0.000022024771,0.00016136633,0.00006347577],"domain_scores_gemma":[0.9998042,0.000019355757,0.000055504675,0.000042462598,0.00003210843,0.000046363177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000056040983,0.000060424183,0.00008590292,0.000036446298,0.00005052476,0.0001676116,0.000072990035,0.000013085119,0.000009689597],"category_scores_gemma":[0.00001298982,0.000041351894,0.000038439295,0.00005286193,0.00002466737,0.0006556197,0.000026703754,0.00012487678,0.0000075831576],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002881747,0.000009403882,0.0033043704,0.00033180157,0.0003269013,0.0000039288334,0.010616703,0.0072509777,0.000073331306,0.0074436157,0.049368575,0.9212416],"study_design_scores_gemma":[0.0009548886,0.00027304143,0.018893316,0.0001628484,0.00013309009,0.000043621825,0.027723305,0.046217054,0.0008161252,0.003353934,0.90106857,0.00036020938],"about_ca_topic_score_codex":8.886718e-7,"about_ca_topic_score_gemma":5.228663e-8,"teacher_disagreement_score":0.9208814,"about_ca_system_score_codex":0.00002063907,"about_ca_system_score_gemma":0.000003542505,"threshold_uncertainty_score":0.16862813},"labels":[],"label_agreement":null},{"id":"W3041435860","doi":"10.1007/s11831-020-09457-7","title":"What is at the Root of Construction 4.0: A Systematic Review of the Recent Research Effort","year":2020,"lang":"en","type":"review","venue":"Archives of Computational Methods in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Data science; Emerging technologies; Computer science; Big data; Order (exchange); The Internet; Domain (mathematical analysis); Position (finance); Meaning (existential); Knowledge management; Business; World Wide Web; Data mining; Epistemology; Artificial intelligence","score_opus":0.05266108419311241,"score_gpt":0.3889398032345506,"score_spread":0.33627871904143813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3041435860","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000038635135,0.9318047,0.06615687,0.00006693333,0.0006186067,0.0011070865,0.00002171678,0.00001892508,0.00020124899],"genre_scores_gemma":[0.000017745358,0.9375752,0.06218045,0.0000068439786,0.000029217426,0.00013793577,0.000013381767,0.00003046157,0.000008722664],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9972066,0.00065030594,0.0013892334,0.0001751046,0.00043629677,0.0001424105],"domain_scores_gemma":[0.99610925,0.0030243688,0.00037617597,0.00033800758,0.0001214431,0.00003075133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011563646,0.00022338875,0.0013277967,0.00027874138,0.000032903266,0.000012355082,0.00041167167,0.00008259476,0.00001929305],"category_scores_gemma":[0.00045387025,0.00014183781,0.00038757437,0.0009333433,0.00019224049,0.00007397932,0.00012624031,0.00051357184,0.0000012052272],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013637483,0.000004107809,9.785193e-7,0.619693,0.0001534326,1.7080168e-7,0.00018790577,0.016263403,0.000009294851,0.0025223948,0.00001352987,0.36115044],"study_design_scores_gemma":[0.00009926801,0.000021318565,0.00001341753,0.91907024,0.0004075056,0.000083387225,0.0000932734,0.038551655,0.0003483657,0.0027371747,0.038374856,0.00019953003],"about_ca_topic_score_codex":0.0000020084378,"about_ca_topic_score_gemma":0.0000010071536,"teacher_disagreement_score":0.36095092,"about_ca_system_score_codex":0.00008522024,"about_ca_system_score_gemma":0.00011835144,"threshold_uncertainty_score":0.5783978},"labels":[],"label_agreement":null},{"id":"W3042131196","doi":"10.3390/buildings10070121","title":"Fire Safety in Tall Timber Building: A BIM-Based Automated Code-Checking Approach","year":2020,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"FPInnovations; École de Technologie Supérieure; Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"National Research Council Canada","keywords":"Building information modeling; Context (archaeology); Building code; Fire safety; Code (set theory); Set (abstract data type); Domain (mathematical analysis); Engineering; Field (mathematics); Information model; Architectural engineering; Computer science; Building design; Fire protection; Construction engineering; Software engineering; Civil engineering","score_opus":0.013861484472442849,"score_gpt":0.21588104913060552,"score_spread":0.20201956465816268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042131196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84561884,0.00021671603,0.1428841,0.0006408508,0.0002507977,0.00027462622,0.000018314917,0.0029570814,0.007138678],"genre_scores_gemma":[0.9712408,0.000008269175,0.028264735,0.00029665034,0.0000842528,0.00002751697,0.000021711408,0.00004142548,0.000014601352],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990184,0.000018547573,0.00030413136,0.00025546725,0.00015606506,0.00024739973],"domain_scores_gemma":[0.9996798,0.000025795787,0.000040688697,0.00012202469,0.000033542514,0.00009812719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009991449,0.0001856573,0.00019946996,0.000086518354,0.00005239188,0.000059460494,0.00014613576,0.00014605647,0.000086949774],"category_scores_gemma":[0.00004038997,0.00019438492,0.00006790501,0.00052967184,0.000033372125,0.00015105144,0.000021266023,0.00025891926,0.000026900732],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007825969,0.00005310644,0.004946201,0.0003056864,0.000056602148,0.000016033751,0.0009493793,0.9209286,0.03750351,0.013626966,0.0073717944,0.014163842],"study_design_scores_gemma":[0.0005357828,0.000015645006,0.0008609922,0.000053585856,0.000009656464,0.000008327056,0.000075190896,0.9755699,0.0050460855,0.00007040053,0.017525138,0.00022929146],"about_ca_topic_score_codex":0.000029994319,"about_ca_topic_score_gemma":0.0000050639474,"teacher_disagreement_score":0.125622,"about_ca_system_score_codex":0.00011427077,"about_ca_system_score_gemma":0.000029951629,"threshold_uncertainty_score":0.7926787},"labels":[],"label_agreement":null},{"id":"W3042358698","doi":"10.1061/(asce)co.1943-7862.0001909","title":"Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; St. Joseph’s Healthcare Hamilton; Concordia University; University of New Brunswick; Alberta Energy","funders":"","keywords":"Modular design; Productivity; Value stream mapping; Process (computing); Lean manufacturing; Performance indicator; Manufacturing engineering; Production line; Engineering; Lean construction; Production (economics); Quality (philosophy); Prefabrication; Systems engineering; Computer science; Construction industry; Construction engineering; Civil engineering; Mechanical engineering; Business","score_opus":0.003026643427788348,"score_gpt":0.1731532312349105,"score_spread":0.17012658780712214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042358698","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6589408,0.00015069419,0.33948755,0.00017729873,0.00089437497,0.00011304516,0.0000017858445,0.00009139234,0.00014303745],"genre_scores_gemma":[0.9436243,0.0005834055,0.05548812,0.000053839347,0.00021963131,0.000007162855,6.443963e-7,0.000017228924,0.000005655477],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99924356,0.0000054785537,0.00032487043,0.00012970167,0.00016073632,0.00013565132],"domain_scores_gemma":[0.99962133,0.000009269952,0.000077467324,0.00006451536,0.00006167988,0.00016576456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000713083,0.00015104582,0.00018123651,0.00019643697,0.000052923562,0.000049196628,0.000049546536,0.00006156111,0.00000976388],"category_scores_gemma":[0.000010964623,0.00014996182,0.000032872867,0.00015475103,0.000031903546,0.00028994368,0.000019406507,0.00022943871,0.0000017457784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009006165,0.000008679502,0.0012415398,0.0014001592,0.00034643218,0.000015598815,0.00076571223,0.33012646,0.004290222,0.012928774,0.000088192115,0.64869815],"study_design_scores_gemma":[0.003763667,0.0010228477,0.022150248,0.0017952339,0.00060104305,0.0031788824,0.005982231,0.77276444,0.09729935,0.0012533171,0.08836917,0.0018195715],"about_ca_topic_score_codex":3.159199e-7,"about_ca_topic_score_gemma":7.198079e-8,"teacher_disagreement_score":0.6468786,"about_ca_system_score_codex":0.00003271597,"about_ca_system_score_gemma":0.000005363366,"threshold_uncertainty_score":0.6115266},"labels":[],"label_agreement":null},{"id":"W3044390034","doi":"10.29173/ijic217","title":"Development of Automated Top-Down Construction System for Low-rise Building Structures","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Education, India; Division of Human Resource Development; Indian Institute of Technology Madras; Curtin University of Technology; Department of Science and Technology, Ministry of Science and Technology, India","keywords":"Automation; Construct (python library); Structural system; Frame (networking); Function (biology); Computer science; Engineering; Systems engineering; Mechanical engineering; Civil engineering","score_opus":0.021304602436279317,"score_gpt":0.2601773538175763,"score_spread":0.23887275138129696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044390034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7908976,0.00012794159,0.19491822,0.00024823632,0.012679578,0.00032781545,0.00006962457,0.00036486235,0.00036610314],"genre_scores_gemma":[0.8837595,0.0000145014965,0.11493891,0.000015781365,0.0012177224,0.00001086376,0.000016925256,0.000023832346,0.0000019930528],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977166,0.000048529575,0.0014214702,0.00015533161,0.00050161954,0.00015644933],"domain_scores_gemma":[0.9978787,0.000066077955,0.00082472846,0.00008044318,0.00102487,0.0001251816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002485676,0.00020869772,0.00040553263,0.00036372224,0.00007550263,0.000088270346,0.00028734346,0.00024627626,0.000065811495],"category_scores_gemma":[0.0001875062,0.00020083408,0.00019075946,0.00025061332,0.000110394656,0.00039413033,0.000021219916,0.00029376522,0.0000018977742],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017604022,0.000030318131,0.0009364425,0.00026867996,0.0017719618,0.000012689957,0.0011830187,0.016303606,0.32038993,0.054401617,0.0016101599,0.6013312],"study_design_scores_gemma":[0.00962138,0.00017054821,0.00018813131,0.000731813,0.0002299292,0.0016336595,0.006667817,0.06030853,0.8981089,0.00097208685,0.020807542,0.00055969],"about_ca_topic_score_codex":0.0000034216473,"about_ca_topic_score_gemma":9.3269904e-7,"teacher_disagreement_score":0.6007715,"about_ca_system_score_codex":0.00032144456,"about_ca_system_score_gemma":0.00028602922,"threshold_uncertainty_score":0.81897765},"labels":[],"label_agreement":null},{"id":"W3044904954","doi":"10.29173/ijic212","title":"Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Rework; Benchmarking; Modular design; Quality (philosophy); Benchmark (surveying); Quality management; Key (lock); Construction management; Engineering; Systems engineering; Process management; Computer science; Construction engineering; Operations management; Business; Civil engineering; Management system","score_opus":0.045777543687967735,"score_gpt":0.28270067444928976,"score_spread":0.23692313076132201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044904954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9881729,0.00005377335,0.00533062,0.00036591233,0.005475554,0.0002709756,0.00001581418,0.00008108215,0.00023339402],"genre_scores_gemma":[0.994417,0.000014917697,0.003743864,0.00007803749,0.0017130795,0.0000073424453,0.000004706262,0.000018453027,0.0000025641023],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99799585,0.00016183434,0.0009010827,0.00021668167,0.00058909773,0.00013546519],"domain_scores_gemma":[0.998674,0.00009777672,0.00047397477,0.00008786734,0.00051823154,0.00014814634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004036237,0.00020800928,0.0003101151,0.00030786917,0.00010501969,0.00016210013,0.00012867467,0.0001625037,0.00007336202],"category_scores_gemma":[0.00024226992,0.00019569392,0.000105314146,0.00021052487,0.0001155105,0.0004905982,0.00003199298,0.0005699399,0.0000021209125],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012963819,0.0001228966,0.019727128,0.000030726475,0.0010012881,0.0012501384,0.0018571534,0.009916315,0.016703984,0.0058045452,0.00021417206,0.94207525],"study_design_scores_gemma":[0.09220276,0.009995696,0.011804627,0.0014890834,0.0018179377,0.33732784,0.14750613,0.3186555,0.059005886,0.0048365197,0.010416259,0.0049417666],"about_ca_topic_score_codex":0.00008682828,"about_ca_topic_score_gemma":0.000009726231,"teacher_disagreement_score":0.9371335,"about_ca_system_score_codex":0.00016739694,"about_ca_system_score_gemma":0.000115732095,"threshold_uncertainty_score":0.79801667},"labels":[],"label_agreement":null},{"id":"W3044979530","doi":"10.29173/ijic208","title":"Towards Dynamic Vertical Urbanism","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Urbanism; Horizontal and vertical; Landmark; Function (biology); Process (computing); Computer science; Roof; Obstacle; Civil engineering; Architecture; Engineering; Geography; Artificial intelligence","score_opus":0.01942932704328958,"score_gpt":0.24728784148406566,"score_spread":0.22785851444077607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044979530","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7085994,0.00050169235,0.23568524,0.010833716,0.033283066,0.00022841274,0.000044367254,0.00035454737,0.010469569],"genre_scores_gemma":[0.99509025,0.00009555724,0.0032304518,0.0001720392,0.001377753,0.0000020101604,0.000006724115,0.000015901145,0.000009304799],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987351,0.00003787023,0.00059772877,0.00008868121,0.0004350583,0.000105593695],"domain_scores_gemma":[0.9992689,0.000023980738,0.00011706237,0.000053641394,0.00040305094,0.00013334872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001050063,0.0001221889,0.00019556154,0.0001538969,0.000025748857,0.00009128704,0.0002446256,0.00016089137,0.00043723517],"category_scores_gemma":[0.0001753623,0.00011467705,0.00013987582,0.00015750935,0.00007824336,0.00035982116,0.000015766318,0.00042036112,0.000023494855],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007313726,0.000029684928,0.00078332954,0.000011408904,0.00083871756,0.00007358974,0.00042047768,0.0036179526,0.04486523,0.031649027,0.006724567,0.91025466],"study_design_scores_gemma":[0.03378215,0.0013847513,0.0036130277,0.00062656787,0.00077636156,0.012824944,0.0044760494,0.2017167,0.22545041,0.030690994,0.4824408,0.0022172476],"about_ca_topic_score_codex":0.000003661837,"about_ca_topic_score_gemma":8.53471e-7,"teacher_disagreement_score":0.9080374,"about_ca_system_score_codex":0.00016432763,"about_ca_system_score_gemma":0.00011769921,"threshold_uncertainty_score":0.47874185},"labels":[],"label_agreement":null},{"id":"W3045107745","doi":"10.1016/j.buildenv.2020.107099","title":"A review of ontologies within the domain of smart and ongoing commissioning","year":2020,"lang":"en","type":"review","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Bio-oriented Technology Research Advancement Institution; Natural Sciences and Engineering Research Council of Canada","keywords":"Ontology; Computer science; Identification (biology); Key (lock); Domain (mathematical analysis); Project commissioning; Data science; Readability; Information retrieval; Publishing","score_opus":0.02015607492006178,"score_gpt":0.24118066167259913,"score_spread":0.22102458675253736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045107745","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00005408969,0.9987493,0.00068083615,0.00005200074,0.000058678706,0.00017138271,0.000005579145,0.000017681075,0.00021040716],"genre_scores_gemma":[0.00015549148,0.99756306,0.0022099877,0.000014239506,0.000015336589,0.000021697178,0.0000023968478,0.000011641144,0.0000061282694],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993443,0.000048639668,0.00036301435,0.00011057175,0.00007433099,0.000059129357],"domain_scores_gemma":[0.9996294,0.00007291998,0.00014644543,0.00012225355,0.0000022719037,0.00002675602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018588395,0.000143753,0.0005620758,0.0000246761,0.00003980178,0.000007191699,0.00006663794,0.00006751725,0.000010867953],"category_scores_gemma":[0.000018484494,0.00008941653,0.00007243823,0.000042706397,0.00008672576,0.000019269295,0.00004757032,0.00015985867,6.085826e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.292047e-7,0.0000018424114,0.000006613186,0.036581773,0.00005153408,3.7215162e-7,0.0000813849,0.000018358982,0.000011580099,0.0008787406,0.00012638437,0.9622409],"study_design_scores_gemma":[0.00003548202,0.00001999916,0.000005796676,0.0571132,0.00018636968,0.000034467706,0.0000723294,0.00008010781,0.000018126402,0.000107058026,0.94223255,0.00009452756],"about_ca_topic_score_codex":0.0000055248333,"about_ca_topic_score_gemma":6.473741e-7,"teacher_disagreement_score":0.96214634,"about_ca_system_score_codex":0.000023330622,"about_ca_system_score_gemma":0.00000887627,"threshold_uncertainty_score":0.36463},"labels":[],"label_agreement":null},{"id":"W3047400308","doi":"10.46421/2706-6568.37.2020.paper002","title":"Automatic Generation of Architectural Layouts using Genetic Algorithms in BIM","year":2020,"lang":"en","type":"article","venue":"CIB W78 conference series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Genetic algorithm; Engineering drawing; Algorithm; Engineering; Machine learning","score_opus":0.04684001078597686,"score_gpt":0.23161949747871965,"score_spread":0.1847794866927428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047400308","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9482333,0.000120392135,0.050928824,0.000092054506,0.00023165054,0.00008664333,0.0000069106336,0.00010166255,0.00019856083],"genre_scores_gemma":[0.9895336,0.000013929177,0.010323741,0.00002049546,0.00007799543,0.0000075962316,0.000008129066,0.000009545548,0.000004967441],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994665,0.000020279633,0.00022551641,0.00010181819,0.000083714905,0.00010220781],"domain_scores_gemma":[0.99980277,0.0000075177454,0.000031691157,0.00007679514,0.000045355275,0.000035900954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000021164367,0.000095232666,0.00013560652,0.000059420465,0.000021837877,0.000031357813,0.00006463415,0.000049518178,0.00012700276],"category_scores_gemma":[0.000019776486,0.000094451374,0.000023586328,0.00016204889,0.000053526932,0.00014191271,0.000010408171,0.000086652246,0.0000052674377],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000134191605,0.000011656081,0.0045816656,0.00038065997,0.000050456867,0.0000108698805,0.011643284,0.10810922,0.3872031,0.007834707,0.000041542517,0.4801194],"study_design_scores_gemma":[0.0001328938,0.00003345162,0.004500656,0.000035147776,0.000007674973,0.000017548227,0.0005461444,0.9302152,0.063929014,0.0004248251,0.00004051361,0.00011696901],"about_ca_topic_score_codex":0.000026048872,"about_ca_topic_score_gemma":0.000057471545,"teacher_disagreement_score":0.82210594,"about_ca_system_score_codex":0.000019349316,"about_ca_system_score_gemma":0.00004010398,"threshold_uncertainty_score":0.38516152},"labels":[],"label_agreement":null},{"id":"W3047783999","doi":"10.1061/9780784483190.003","title":"Risk-Based and Condition-Based Assessment Framework for Large Diameter Sewers","year":2020,"lang":"en","type":"article","venue":"Pipelines 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Sanitary sewer; Computer science; Environmental science; Reliability engineering; Engineering; Environmental engineering","score_opus":0.010959506694653183,"score_gpt":0.2587086627762036,"score_spread":0.2477491560815504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047783999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014444288,0.00013555736,0.98225105,0.001862518,0.0004073822,0.00021105728,0.00029881278,0.00024642763,0.00014288175],"genre_scores_gemma":[0.9350774,0.000017193413,0.06275663,0.0015347148,0.000366951,0.00008868782,0.00012742447,0.000024420122,0.0000065792224],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994468,0.00001768603,0.00016679258,0.00015479217,0.00008548735,0.00012845159],"domain_scores_gemma":[0.99955374,0.00018249605,0.00003723599,0.00008172782,0.00005575117,0.00008905431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000058176993,0.00011674197,0.00012452854,0.000026291267,0.00006465076,0.000043623262,0.00004573331,0.00008427516,0.00021351135],"category_scores_gemma":[0.00011165251,0.00011197559,0.00006135247,0.00011040129,0.000017708702,0.000054003118,0.0000046611967,0.00015469176,0.0000152032735],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058692356,0.00034077244,0.26618326,0.0035308513,0.0007500663,0.000024341547,0.0017979266,0.20667973,0.013596816,0.09197061,0.2376183,0.1769204],"study_design_scores_gemma":[0.0007603657,0.000055076525,0.001956383,0.000025032694,0.00004790102,4.022877e-7,0.00010568762,0.9688665,0.0021406107,0.0016282523,0.02423311,0.00018063006],"about_ca_topic_score_codex":0.0000025883264,"about_ca_topic_score_gemma":0.000006880408,"teacher_disagreement_score":0.92063314,"about_ca_system_score_codex":0.000018341869,"about_ca_system_score_gemma":0.000026867467,"threshold_uncertainty_score":0.4566232},"labels":[],"label_agreement":null},{"id":"W3048897867","doi":"10.3311/ccc2020-030","title":"Implementation of the Common Vulnerability Scoring System to Assess the Cyber Vulnerability in Construction Projects","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"York University; New York University Abu Dhabi","keywords":"Vulnerability (computing); Vulnerability assessment; Computer science; Computer security; Digitization; Process (computing); Risk analysis (engineering); Vulnerability management; Confidentiality; Construction industry; Engineering; Construction engineering; Business; Telecommunications","score_opus":0.03637205381733042,"score_gpt":0.2850880011760495,"score_spread":0.24871594735871907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048897867","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889723,0.0000075024177,0.006494711,0.0006268785,0.0005178805,0.00067286944,0.000007678423,0.00012267007,0.0025774739],"genre_scores_gemma":[0.9993465,7.2567286e-7,0.00044044096,0.000062684645,0.000054623084,0.00008284538,0.0000016883181,0.00000786724,0.000002621413],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9990309,0.0001588093,0.00037859508,0.00015100976,0.00016536565,0.00011534105],"domain_scores_gemma":[0.9995653,0.000060008708,0.000049672548,0.00022695107,0.00006410677,0.00003395285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032023498,0.00009852193,0.00013796559,0.000029937553,0.00007884498,0.000030105646,0.00013325346,0.00004443602,0.00004810175],"category_scores_gemma":[0.00003042244,0.000060327275,0.000047606696,0.00044929984,0.000049540035,0.00013486101,0.000033193446,0.00019474947,0.0000037147586],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025953357,0.000015041595,0.8492671,0.000411367,0.00003244698,2.6614526e-7,0.003026583,0.020999644,0.020562038,0.04108931,0.00023245254,0.06433776],"study_design_scores_gemma":[0.00068463205,0.00006550809,0.668438,0.00010061166,0.000033755496,0.00001944447,0.038574316,0.046682753,0.2443402,0.00032295124,0.0004476321,0.0002901991],"about_ca_topic_score_codex":0.00057086017,"about_ca_topic_score_gemma":0.0017573393,"teacher_disagreement_score":0.22377816,"about_ca_system_score_codex":0.00015557354,"about_ca_system_score_gemma":0.00003416613,"threshold_uncertainty_score":0.24600749},"labels":[],"label_agreement":null},{"id":"W3081146706","doi":"10.29173/ijic220","title":"Feasibility and Implications of the Modular Construction Approach for Rapid Post-Disaster Recovery","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Demolition; Prefabrication; Process (computing); Engineering; Population; Government (linguistics); Disaster recovery; Emergency management; Architectural engineering; Construction engineering; Civil engineering; Risk analysis (engineering); Environmental planning; Forensic engineering; Business; Computer science; Political science; Geography","score_opus":0.039385484879517735,"score_gpt":0.24985082266287503,"score_spread":0.2104653377833573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081146706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.781914,0.0003299187,0.20773977,0.003073604,0.0051811826,0.0005950353,0.00024856327,0.000049022317,0.0008688844],"genre_scores_gemma":[0.9817975,0.00011124398,0.017178457,0.00010718717,0.000755773,0.000012561664,0.000018271814,0.000014416765,0.000004578162],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99875456,0.000066879395,0.00071049033,0.00013209847,0.0002465154,0.000089478584],"domain_scores_gemma":[0.9984226,0.00006513978,0.0004607278,0.00011261706,0.00086832844,0.00007054124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020597456,0.00012648763,0.00022947785,0.00012243909,0.000059550053,0.000058346774,0.00022492712,0.00015937549,0.00004660914],"category_scores_gemma":[0.00029440733,0.00010108766,0.00019668425,0.00017202564,0.00021443484,0.0003623571,0.000024420884,0.00026334196,3.0576118e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020060865,0.00007544324,0.017593645,0.00009510872,0.0011462829,6.409529e-7,0.0007238158,0.01057631,0.0994024,0.030611396,0.0017468464,0.836022],"study_design_scores_gemma":[0.09190005,0.0037957826,0.09069904,0.0014521866,0.003543436,0.01805677,0.03637007,0.15684944,0.38563547,0.12455604,0.082811624,0.004330098],"about_ca_topic_score_codex":0.0000049543305,"about_ca_topic_score_gemma":9.92976e-7,"teacher_disagreement_score":0.8316919,"about_ca_system_score_codex":0.0001112285,"about_ca_system_score_gemma":0.00011022408,"threshold_uncertainty_score":0.4122235},"labels":[],"label_agreement":null},{"id":"W3082354722","doi":"10.1016/j.autcon.2020.103368","title":"Rule-based compliance checking and generative design for building interiors using BIM","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Athabasca University","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures; CRDF Global","keywords":"Building information modeling; Generative Design; Computer science; Process (computing); Building design; Design language; Set (abstract data type); Modeling language; Representation (politics); Software engineering; Engineering design process; Design process; Systems engineering; Human–computer interaction; Engineering; Programming language; Architectural engineering; Software; Work in process","score_opus":0.06662640949856635,"score_gpt":0.2762750582442213,"score_spread":0.20964864874565498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082354722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33303505,0.00005004603,0.6659943,0.00015822933,0.00032991436,0.00020958256,0.0000045280653,0.00019251466,0.000025850084],"genre_scores_gemma":[0.7089757,0.0000045474094,0.29083368,0.000057711564,0.00007288424,0.000036229874,0.0000059891076,0.000012843661,4.253971e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993636,0.00003493617,0.00024599553,0.00016872279,0.00007041241,0.00011636131],"domain_scores_gemma":[0.9997212,0.000053979827,0.000070239475,0.00005237541,0.00006189638,0.00004028165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009235375,0.00011918868,0.00013383625,0.00012452311,0.00009175304,0.00007165781,0.000038266116,0.00007806398,0.0000136205745],"category_scores_gemma":[0.00004120559,0.00013717581,0.000026825232,0.0002314267,0.00006009232,0.00030064606,0.000005934153,0.00009128349,0.0000015186737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058134017,0.000006566086,0.0035869973,0.00029045963,0.000037047907,9.092806e-7,0.0007527206,0.50266576,0.26457226,0.014842484,0.000060970626,0.2131257],"study_design_scores_gemma":[0.00045842322,0.000019840958,0.000559346,0.00009414574,0.000009899758,0.000015599084,0.00021970851,0.9422458,0.05506214,0.0010775717,0.0001044286,0.00013309009],"about_ca_topic_score_codex":0.0000052457717,"about_ca_topic_score_gemma":0.0000024066592,"teacher_disagreement_score":0.43958005,"about_ca_system_score_codex":0.00010416363,"about_ca_system_score_gemma":0.00002885861,"threshold_uncertainty_score":0.5593867},"labels":[],"label_agreement":null},{"id":"W3083247486","doi":"10.35784/bud-arch.2160","title":"Time-Cost Relationship for Predicting Construction Duration","year":2013,"lang":"en","type":"article","venue":"Budownictwo i Architektura","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomechanica (Canada)","funders":"","keywords":"Duration (music); Function (biology); Construction management; Construction engineering; Computer science; Pre-construction services; Operations research; Project management; Engineering; Operations management; Transport engineering; Risk analysis (engineering); Civil engineering; Project planning; Business; Systems engineering","score_opus":0.010152214787963583,"score_gpt":0.20461385570411528,"score_spread":0.1944616409161517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3083247486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8271978,0.00013491102,0.14392096,0.00063501403,0.0017902089,0.0021056083,0.00006797861,0.0015437923,0.02260371],"genre_scores_gemma":[0.9798026,0.000007899827,0.018449934,0.000042820575,0.00032637906,0.0005849438,0.00018671143,0.000035628498,0.00056306506],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906915,0.00002500969,0.00037156782,0.0001783353,0.00012441038,0.0002315105],"domain_scores_gemma":[0.99938774,0.000173561,0.0000666305,0.00017795537,0.000118123695,0.00007598443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010426692,0.00015622606,0.00012450745,0.00013843947,0.00020037273,0.00010409198,0.000084543026,0.00011071428,0.0002849159],"category_scores_gemma":[0.00010598454,0.00015177525,0.000078470504,0.0001799186,0.00007722886,0.00043001756,0.000009768623,0.00018640858,0.0003773842],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006679642,0.000051000425,0.047668047,0.00029240872,0.00021201235,8.245549e-7,0.0020157052,0.03560856,0.056274824,0.080805056,0.03432415,0.7426806],"study_design_scores_gemma":[0.001223841,0.00008421246,0.06478162,0.000098918914,0.00006783433,0.00016797453,0.0005635803,0.88322157,0.00460842,0.02460752,0.019902648,0.00067186373],"about_ca_topic_score_codex":0.00001246675,"about_ca_topic_score_gemma":0.00000912858,"teacher_disagreement_score":0.847613,"about_ca_system_score_codex":0.00006435585,"about_ca_system_score_gemma":0.000020982881,"threshold_uncertainty_score":0.6189215},"labels":[],"label_agreement":null},{"id":"W3083778987","doi":"10.36680/j.itcon.2020.024","title":"Construction 4.0: a survey of research trends","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Digitization; Structuring; Construction industry; Quality (philosophy); Engineering; Emerging technologies; Industry 4.0; Construction management; Construction engineering; Business; Engineering management; Computer science; Civil engineering; Telecommunications","score_opus":0.025717033543118405,"score_gpt":0.27746792897006844,"score_spread":0.25175089542695006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3083778987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9316183,0.0002276719,0.06078934,0.0017513225,0.0016049228,0.00013679352,0.000028674003,0.00019423832,0.0036487798],"genre_scores_gemma":[0.9909372,0.00014208238,0.008845727,0.000013767242,0.000043773893,0.0000024738372,0.0000081389035,0.0000056420677,0.0000012349242],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983929,0.00006909128,0.0010470015,0.00005395378,0.00029493583,0.00014215856],"domain_scores_gemma":[0.99846846,0.00006190759,0.00037816723,0.000098236116,0.00094528013,0.000047957918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006747385,0.00009355283,0.00024677758,0.0025899867,0.000039174804,0.000023467044,0.0001663283,0.0002746938,0.00007064704],"category_scores_gemma":[0.00043240146,0.00009245958,0.000046789304,0.0030337253,0.00037773134,0.0010526679,0.000017103006,0.0007015585,0.000009996494],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013461964,0.000011142846,0.06227644,0.0000775453,0.000056075798,0.0000018410508,0.0005360654,0.002333668,0.0026707316,0.028849714,0.00090254867,0.9021496],"study_design_scores_gemma":[0.012244031,0.0030162786,0.26326495,0.0010662489,0.000125566,0.008501894,0.045389295,0.10095512,0.48902923,0.055754784,0.01914252,0.0015100733],"about_ca_topic_score_codex":0.000016749435,"about_ca_topic_score_gemma":0.000013581962,"teacher_disagreement_score":0.90063953,"about_ca_system_score_codex":0.00011120235,"about_ca_system_score_gemma":0.00008970691,"threshold_uncertainty_score":0.37703922},"labels":[],"label_agreement":null},{"id":"W3084234387","doi":"10.1139/cjce-2019-0825","title":"4D-based automation of heavy lift planning in industrial construction projects","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; PCL Construction (Canada); University of New Brunswick; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Lift (data mining); Engineering; Lifting equipment; Process (computing); Automation; Visualization; Transport engineering; Computer science; Construction engineering","score_opus":0.019825054788540273,"score_gpt":0.1897154481543923,"score_spread":0.16989039336585204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084234387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84487575,0.00058612984,0.15079553,0.00032308276,0.0020309146,0.00016948185,0.000014522898,0.00007912746,0.0011254754],"genre_scores_gemma":[0.998512,0.0000018457507,0.0012161874,0.0000174451,0.00023297516,0.0000018574407,0.000002459306,0.000014570003,6.104909e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992812,0.000011776124,0.0003989763,0.000055217402,0.00010456141,0.00014823301],"domain_scores_gemma":[0.99956816,0.00002392882,0.00008604477,0.00004455064,0.00006660219,0.00021073707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000103961065,0.0000967644,0.00018044682,0.0004379711,0.000019921235,0.000031272928,0.00007408484,0.00010385226,0.00005916333],"category_scores_gemma":[0.00011980279,0.000108955464,0.000048419206,0.00036837766,0.000023826573,0.00019552677,0.0000014638922,0.0003101506,8.92304e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010033176,0.0000013601975,0.006958347,0.00006908329,0.00001859382,0.000018573994,0.0005417087,0.9865148,0.0020013624,0.00045516147,0.00032873137,0.0030822556],"study_design_scores_gemma":[0.0012768949,0.00013111836,0.0037395624,0.00071371696,0.000024275421,0.000109520064,0.000484674,0.97536194,0.01441268,0.000042052536,0.0034511783,0.00025238295],"about_ca_topic_score_codex":0.00012011351,"about_ca_topic_score_gemma":0.0028504296,"teacher_disagreement_score":0.15363632,"about_ca_system_score_codex":0.00013450898,"about_ca_system_score_gemma":0.00042133086,"threshold_uncertainty_score":0.44430748},"labels":[],"label_agreement":null},{"id":"W3086115252","doi":"10.19083/tesis/625159","title":"Optimización del planeamiento y control de un proyecto inmobiliario, a través de LPS y un modelo BIM para el secuenciamiento e identificación de restricciones","year":2018,"lang":"es","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"College of Physicians and Surgeons of Ontario","funders":"","keywords":"Humanities; Philosophy; Political science","score_opus":0.008611485110410932,"score_gpt":0.24533355190955983,"score_spread":0.2367220667991489,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086115252","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60379535,0.00065591774,0.38953927,0.00007749115,0.00131186,0.0011951837,0.00023622521,0.00058773387,0.0026009607],"genre_scores_gemma":[0.97231865,0.0006758479,0.02178255,0.0001457264,0.0005794216,0.00091858936,0.0014276709,0.00021832604,0.00193319],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9950738,0.00031693836,0.0014321223,0.0011001552,0.00071686454,0.001360135],"domain_scores_gemma":[0.99730957,0.00019684262,0.0004632136,0.0007909442,0.0006805663,0.0005588849],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00080106576,0.0011160331,0.00090445287,0.0008805221,0.00054422405,0.00053688604,0.0007010878,0.0016646228,0.0010147865],"category_scores_gemma":[0.00023103009,0.0011380318,0.00044948817,0.0009042456,0.00015429192,0.00054966996,0.00003366262,0.0010300652,0.0002312982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044236933,0.0019750476,0.03182802,0.003730844,0.0049850405,0.00036555436,0.02559501,0.5388226,0.12524912,0.15702915,0.005961295,0.100034654],"study_design_scores_gemma":[0.003663059,0.0003353586,0.023012366,0.0006863656,0.0011732477,0.00047557894,0.006652441,0.9043672,0.04755158,0.008924558,0.0010266964,0.0021315173],"about_ca_topic_score_codex":0.0030905046,"about_ca_topic_score_gemma":0.0015004365,"teacher_disagreement_score":0.3685233,"about_ca_system_score_codex":0.0010512728,"about_ca_system_score_gemma":0.00083675183,"threshold_uncertainty_score":0.99989843},"labels":[],"label_agreement":null},{"id":"W3086133385","doi":"10.1111/mice.12619","title":"A tribute to 35 years of high-impact research and outstanding leadership","year":2020,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Tribute; Citation; Library science; Sociology; Political science; Law; Computer science","score_opus":0.03579524849168424,"score_gpt":0.24244965778109756,"score_spread":0.2066544092894133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086133385","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7502783,0.00057910575,0.2481856,0.00024367294,0.0003134282,0.00013750076,0.000022319939,0.00019012112,0.000049966275],"genre_scores_gemma":[0.9942387,0.000051277235,0.005311831,0.0000413336,0.0003129853,0.0000053190347,0.0000059258623,0.000026787187,0.0000058909554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991085,0.000014428831,0.00022055749,0.00020708688,0.00016945263,0.00028000446],"domain_scores_gemma":[0.9995137,0.00007563474,0.000019214614,0.00011020119,0.000052634783,0.00022864364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010144478,0.00016577073,0.00025514053,0.00020861208,0.000039088318,0.000074034324,0.00010375017,0.000101082485,0.000024223778],"category_scores_gemma":[0.000036438607,0.00016669922,0.00003511277,0.0004220472,0.000041794265,0.00015142163,0.00006292756,0.00034141674,0.000001928786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082585444,0.000010139551,0.0022323371,0.0009170404,0.0002724768,0.000020421901,0.0061789406,0.63342196,0.07154553,0.007259872,0.010959808,0.2670989],"study_design_scores_gemma":[0.0017174261,0.001077898,0.14758599,0.00063202437,0.000041827865,0.0001335282,0.000667072,0.8192143,0.012151171,0.002050652,0.013755505,0.00097264716],"about_ca_topic_score_codex":0.000009057436,"about_ca_topic_score_gemma":0.000002757988,"teacher_disagreement_score":0.26612625,"about_ca_system_score_codex":0.000046290737,"about_ca_system_score_gemma":0.000013009126,"threshold_uncertainty_score":0.6797797},"labels":[],"label_agreement":null},{"id":"W3087452701","doi":"10.11575/prism/38188","title":"Learning design with data: towards a pedagogical framework for the use of Building Information Modeling technology as support for design in architecture curricula","year":2020,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Calgary","keywords":"Architecture; Curriculum; Learning design; Computer science; Engineering management; Engineering; Systems engineering; Knowledge management; Data science; Software engineering; Mathematics education; Pedagogy; Sociology; Psychology; Geography","score_opus":0.15706509092723672,"score_gpt":0.3577731028936449,"score_spread":0.20070801196640817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087452701","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006500809,0.000056467878,0.9911448,0.00007854997,0.00014887203,0.0019413774,0.00004277957,0.000014850294,0.00007153509],"genre_scores_gemma":[0.105858214,0.000037129837,0.8921725,0.00001135564,0.000049674924,0.00054772187,0.0012198631,0.000036096084,0.00006741645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999053,0.000028589342,0.00039575808,0.00021903808,0.00013714792,0.00016646872],"domain_scores_gemma":[0.99918085,0.00026670154,0.00016001903,0.00022695065,0.000139129,0.000026340984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028068884,0.00020087467,0.00028254674,0.00019218508,0.000090607944,0.00019553074,0.0004801395,0.00039071584,0.000039250666],"category_scores_gemma":[0.00050197926,0.00014596486,0.00003925474,0.00029552623,0.00002051088,0.0005395777,0.000037809194,0.0005737664,0.0000023930452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029670607,0.0000041864423,0.0000041964113,0.000064362175,0.00004359262,4.310523e-7,0.0017225441,0.65726197,0.00011373008,0.000700952,0.00002759531,0.33975974],"study_design_scores_gemma":[0.0003386315,0.00024217978,0.0000022667462,0.00036023158,0.000110705754,0.000012296921,0.0043770066,0.978141,0.0026408043,0.0014708827,0.012092916,0.00021104071],"about_ca_topic_score_codex":0.000018641253,"about_ca_topic_score_gemma":0.000030575546,"teacher_disagreement_score":0.3395487,"about_ca_system_score_codex":0.00003521063,"about_ca_system_score_gemma":0.00020255767,"threshold_uncertainty_score":0.5952274},"labels":[],"label_agreement":null},{"id":"W3088815354","doi":"10.1108/jedt-04-2020-0146","title":"Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: a Delphi survey","year":2020,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Building information modeling; Delphi method; Lean construction; Critical success factor; Questionnaire; Mega-; Engineering; Knowledge management; Construction management; Originality; Delphi; Project management; Construction industry; Engineering management; Integrated project delivery; Business; Process management; Construction engineering; Operations management; Systems engineering; Qualitative research; Civil engineering; Computer science","score_opus":0.04584129129515402,"score_gpt":0.2558299264686255,"score_spread":0.2099886351734715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088815354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37348977,0.00017502798,0.6256853,0.00014535975,0.00029445055,0.000091916074,0.0000040979085,0.000109728906,0.000004378429],"genre_scores_gemma":[0.83818346,0.000155331,0.1615595,0.000010580036,0.00007017578,0.0000052433024,0.000002217879,0.0000133807125,9.733091e-8],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991964,0.000017873,0.00042350515,0.000101308135,0.000105440566,0.00015546403],"domain_scores_gemma":[0.9989323,0.00044370216,0.00023402928,0.00004962852,0.00026520356,0.00007515711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030121327,0.00015354,0.00023002713,0.00043927872,0.00008366136,0.00009762334,0.000066236564,0.0002003396,0.0000017869481],"category_scores_gemma":[0.0012816974,0.0001459885,0.000029437773,0.00028726048,0.0000754984,0.0008539735,0.000010596782,0.00038219575,1.8496138e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003592643,0.000019330404,0.00807495,0.0007741743,0.00029756426,0.0000063846023,0.0008502067,0.77005064,0.018835207,0.12466476,0.000062369916,0.076005116],"study_design_scores_gemma":[0.0005595712,0.00038610658,0.00014697526,0.00013428698,0.000060946117,0.00028577037,0.0012389546,0.98278886,0.012820543,0.0009427985,0.00041492886,0.00022024852],"about_ca_topic_score_codex":0.0000035421488,"about_ca_topic_score_gemma":4.200633e-7,"teacher_disagreement_score":0.4646937,"about_ca_system_score_codex":0.000038293434,"about_ca_system_score_gemma":0.000025845347,"threshold_uncertainty_score":0.5953238},"labels":[],"label_agreement":null},{"id":"W3088827038","doi":"10.1080/15623599.2020.1819583","title":"Scheduling tools for the construction industry: overview and decision support system for tool selection","year":2020,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Lagging; Automation; Process management; Computer science; Productivity; Schedule; Process (computing); Enterprise resource planning; Identification (biology); Engineering management; Operations management; Engineering","score_opus":0.02677347746712758,"score_gpt":0.2663400199148266,"score_spread":0.239566542447699,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088827038","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035496727,0.00027889796,0.9570412,0.0011786955,0.0050723865,0.00050527835,0.000030101994,0.000079273996,0.0003174431],"genre_scores_gemma":[0.81398094,0.0006846323,0.18350565,0.00022893214,0.0014691921,0.000078265446,0.000012325491,0.000027161757,0.000012916001],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988264,0.000014037175,0.0005955393,0.00013485225,0.0003151903,0.00011399484],"domain_scores_gemma":[0.9989175,0.00016875731,0.0002682502,0.00005895155,0.00052769494,0.000058826394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028321854,0.00013599676,0.00017145342,0.000160005,0.0001203819,0.00027508292,0.00017469749,0.00011059307,0.000044566383],"category_scores_gemma":[0.000071420385,0.00011238339,0.00013029628,0.00013977532,0.000060828424,0.00058499706,0.000023171528,0.0002145133,0.00000228852],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022992428,0.0000047822414,0.00031194728,0.00012936498,0.00047088886,0.0000015908621,0.000050314247,0.015137233,0.00034266253,0.10298043,0.0008774672,0.8794634],"study_design_scores_gemma":[0.009848398,0.000638731,0.002703572,0.0009491296,0.001129081,0.0040721186,0.013625405,0.53197414,0.007987526,0.014373474,0.4118441,0.00085435656],"about_ca_topic_score_codex":7.9670014e-7,"about_ca_topic_score_gemma":0.0000010583865,"teacher_disagreement_score":0.87860906,"about_ca_system_score_codex":0.00015634415,"about_ca_system_score_gemma":0.00003293561,"threshold_uncertainty_score":0.4582862},"labels":[],"label_agreement":null},{"id":"W3090386987","doi":"10.1109/aparm49247.2020.9209516","title":"Simulation-based approach for risk assessment in onshore wind farm construction projects","year":2020,"lang":"en","type":"article","venue":"2020 Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Wind power; Risk assessment; Renewable energy; Risk analysis (engineering); Critical path method; Cost estimate; Computer science; Engineering; Operations research; Systems engineering; Business","score_opus":0.012467528594616646,"score_gpt":0.2426844412363086,"score_spread":0.23021691264169197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3090386987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.069113724,0.00004139726,0.9211588,0.0024253575,0.0009284771,0.0011315268,0.0001815597,0.0002582618,0.004760897],"genre_scores_gemma":[0.949228,0.00012843558,0.04987023,0.000142287,0.00017915602,0.00020787683,0.00017392165,0.000038212253,0.000031883847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799514,0.00006333727,0.00062583305,0.0006895881,0.00031953686,0.00030656267],"domain_scores_gemma":[0.9988986,0.00021609994,0.00013519276,0.00021516353,0.00040718148,0.00012774604],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003102316,0.00031751586,0.0003183151,0.00010242661,0.00015029909,0.00009220336,0.00017373233,0.00017886965,0.0000126303685],"category_scores_gemma":[0.0003670387,0.00030805214,0.00012878724,0.00024503103,0.00010771756,0.00026409235,0.000022206465,0.00057474285,0.000002586143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003653369,0.000068801535,0.0010683772,0.000106277126,0.00002958563,9.4174806e-7,0.0002737299,0.98505074,0.0010699218,0.003756222,0.00003180266,0.008178268],"study_design_scores_gemma":[0.0015728971,0.00013299452,0.00006953023,0.0000798809,0.00002114279,0.000002839731,0.0013664255,0.99244475,0.00045863522,0.0015136339,0.0020212608,0.00031602383],"about_ca_topic_score_codex":0.00001499569,"about_ca_topic_score_gemma":0.0000075609796,"teacher_disagreement_score":0.88011426,"about_ca_system_score_codex":0.00036687878,"about_ca_system_score_gemma":0.00008710883,"threshold_uncertainty_score":0.9999372},"labels":[],"label_agreement":null},{"id":"W3092708273","doi":"10.3390/su12208665","title":"Remote Teaching of Building Information Modeling During the COVID-19 Pandemic: A Case Study","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Work (physics); Computer science; CLIPS; Coronavirus disease 2019 (COVID-19); Distance education; Pandemic; Software; Knowledge management; Multimedia; Engineering; Mathematics education; Psychology; Artificial intelligence","score_opus":0.022315739933321546,"score_gpt":0.2848206841298385,"score_spread":0.262504944196517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092708273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76223165,0.000017929842,0.2367223,0.00034532358,0.000049360202,0.00037095678,0.000002415802,0.00020395518,0.000056130546],"genre_scores_gemma":[0.999597,0.0000014959215,0.00027451376,0.00006470402,0.000041476123,0.000010614718,0.0000010227064,0.0000066217463,0.0000025095726],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999187,0.000098964134,0.00035131603,0.000102281876,0.00012696753,0.00013345163],"domain_scores_gemma":[0.9994536,0.000058043363,0.000047908532,0.0001897982,0.00016886176,0.00008176355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005297545,0.00009646547,0.00011623344,0.00004821514,0.0002280906,0.00003799929,0.00009360586,0.000046006004,0.0000068040254],"category_scores_gemma":[0.0011352032,0.000077003475,0.000047739308,0.00016339868,0.000030974905,0.00039664298,0.000041529773,0.00030466725,4.3460656e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041216616,0.000014351783,0.047814,0.0008018476,0.000033833647,0.000028803077,0.0420313,0.8810015,0.00015110013,0.00084798964,0.0000146076,0.027219461],"study_design_scores_gemma":[0.0003539517,0.000030196607,0.0002750506,0.000003534389,0.000018240391,0.00025415822,0.08466362,0.91250896,0.000034181412,0.0013855274,0.00036987147,0.000102685226],"about_ca_topic_score_codex":0.0011963643,"about_ca_topic_score_gemma":0.000053948825,"teacher_disagreement_score":0.23736542,"about_ca_system_score_codex":0.00052182376,"about_ca_system_score_gemma":0.000101815946,"threshold_uncertainty_score":0.31401107},"labels":[],"label_agreement":null},{"id":"W3094400457","doi":"","title":"Modelo estocástico del aprendizaje de la mano de obra en actividades de colocación de muros en bloques de concreto, en construcción masiva de vivienda en México","year":2004,"lang":"es","type":"article","venue":"Revista ingeniería de construcción","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Humanities; Art","score_opus":0.004529202694280266,"score_gpt":0.24345704647238253,"score_spread":0.23892784377810228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3094400457","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7423098,0.00306419,0.2480271,0.00036115642,0.00031878884,0.0009136028,0.0003642497,0.0007823922,0.0038587418],"genre_scores_gemma":[0.89249414,0.0037163594,0.10158261,0.0004697838,0.0008800404,0.00034344627,0.000061214756,0.00031932717,0.00013305269],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99114263,0.002535652,0.001614906,0.00124139,0.00062642276,0.002839013],"domain_scores_gemma":[0.99378586,0.002922353,0.0006037139,0.001057332,0.0002873554,0.0013433734],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity"],"consensus_categories":["metaepi_narrow","research_integrity"],"category_scores_codex":[0.0027477802,0.0015111855,0.0015531315,0.0005641524,0.0006327273,0.0012970861,0.0013331571,0.002214491,0.00034271815],"category_scores_gemma":[0.0024782945,0.0018151923,0.0006962861,0.0007555857,0.0012181043,0.00075075746,0.00032110256,0.0026750537,0.00006380503],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.00042570426,0.0002026846,0.23641853,0.0021026128,0.0016437429,0.0008464535,0.011768521,0.029730259,0.19863366,0.45770723,0.0003437863,0.060176827],"study_design_scores_gemma":[0.015191362,0.0012134163,0.08517226,0.012211525,0.0066073528,0.05385036,0.0135309,0.2693965,0.42007482,0.06343593,0.04926774,0.010047819],"about_ca_topic_score_codex":0.0013116471,"about_ca_topic_score_gemma":0.000089751775,"teacher_disagreement_score":0.3942713,"about_ca_system_score_codex":0.008581567,"about_ca_system_score_gemma":0.006263646,"threshold_uncertainty_score":0.9997637},"labels":[],"label_agreement":null},{"id":"W3094862917","doi":"10.1007/978-3-030-61814-8_7","title":"Design and Implementation of a Serious Game to Make Construction Workers Aware of Exposure to Silica Dust in the Workplace","year":2020,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centre Intégré Universitaire de Santé et de Services Sociaux du Saguenay–Lac-Saint-Jean; Université du Québec à Chicoutimi","funders":"","keywords":"Silicosis; Computer science; Work (physics); Risk analysis (engineering); Business; Medicine; Engineering; Pathology","score_opus":0.010782416865345158,"score_gpt":0.2305440920370108,"score_spread":0.21976167517166564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3094862917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014059826,0.00008524333,0.98442274,0.00039236367,0.00033876105,0.0005538649,0.000006393629,0.00002533224,0.00011549499],"genre_scores_gemma":[0.93731797,0.000010909407,0.062388748,0.000187759,0.000061062805,0.000015669804,0.0000022455083,0.000011156529,0.000004508714],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990276,0.000021476735,0.00030517395,0.00027098606,0.00024450876,0.00013022621],"domain_scores_gemma":[0.99952424,0.000113006055,0.00006965467,0.00018139368,0.00006716646,0.000044524462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020044358,0.00016113301,0.00020617664,0.000286042,0.000026400572,0.000044708242,0.00023321807,0.0001059323,0.000012132694],"category_scores_gemma":[0.000012495596,0.0001367946,0.00002452315,0.00044267153,0.00013594764,0.000063718726,0.00004786886,0.00022477798,0.0000011679599],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020894322,0.0000021087021,0.0007434713,0.00005404269,0.0000069697917,0.0000026147097,0.0032247985,0.3480281,0.0011949447,0.00073295645,0.000018183697,0.64597094],"study_design_scores_gemma":[0.0050565056,0.005877599,0.06995816,0.0077223373,0.0002494333,0.0009955071,0.0015815827,0.7107092,0.12079281,0.0663376,0.0054398873,0.0052793487],"about_ca_topic_score_codex":0.000023797089,"about_ca_topic_score_gemma":0.00023883022,"teacher_disagreement_score":0.9232581,"about_ca_system_score_codex":0.000069526366,"about_ca_system_score_gemma":0.0000770739,"threshold_uncertainty_score":0.5578322},"labels":[],"label_agreement":null},{"id":"W3096234675","doi":"10.3390/modelling1020010","title":"Stochastic Earthmoving Fleet Arrangement Optimization Considering Project Duration and Cost","year":2020,"lang":"en","type":"article","venue":"Modelling—International Open Access Journal of Modelling in Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Duration (music); Operations research; Resource (disambiguation); Engineering; Cost estimate; Industrial engineering; Project management; Estimation; Computer science; Systems engineering","score_opus":0.07008758711287291,"score_gpt":0.3040871298391307,"score_spread":0.2339995427262578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096234675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050790865,0.00016664261,0.9475476,0.00025710932,0.00068221753,0.00026915065,0.000003894358,0.00004356633,0.000238925],"genre_scores_gemma":[0.91752017,0.00021371467,0.08201444,0.000044437005,0.0001649938,0.000013182253,0.00000292211,0.00002191072,0.0000042033976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983027,0.000009460772,0.0007476406,0.00023774889,0.00049053103,0.00021194434],"domain_scores_gemma":[0.9992249,0.000049902086,0.00020690529,0.0000866094,0.00031524626,0.00011643815],"candidate_categories":["scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0006358031,0.00017288454,0.00021990137,0.00050301425,0.00008402189,0.0011953451,0.00089723215,0.0000478045,0.000015451818],"category_scores_gemma":[0.00008041415,0.00017846136,0.00003601052,0.00054059,0.00005912617,0.003828848,0.00015103235,0.0002973557,9.1386266e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024699291,0.000009096493,0.000105301544,0.000025060239,0.000016538796,0.000005062912,0.00044867277,0.9967779,0.00083059515,0.0009201209,0.000012940966,0.00082400086],"study_design_scores_gemma":[0.0004408488,0.000022376427,0.000012601893,0.00020330097,0.000009850109,0.000037319987,0.0000681963,0.99779904,0.0009493417,0.00013414922,0.00014491554,0.00017807307],"about_ca_topic_score_codex":0.00002481631,"about_ca_topic_score_gemma":0.0000025972884,"teacher_disagreement_score":0.8667293,"about_ca_system_score_codex":0.00017445389,"about_ca_system_score_gemma":0.00012255793,"threshold_uncertainty_score":0.9998415},"labels":[],"label_agreement":null},{"id":"W3096288126","doi":"10.1007/978-3-030-60816-3_30","title":"Challenges Related to 4D BIM Simulation in the Construction Industry","year":2020,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Perspective (graphical); Computer science; Construction industry; Knowledge management; Software; Engineering management; Qualitative property; Construction engineering; Engineering; Artificial intelligence","score_opus":0.023101771775548573,"score_gpt":0.2391388738017311,"score_spread":0.21603710202618254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096288126","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016099294,0.0004549287,0.98426074,0.0019205975,0.001889695,0.0003344917,0.0000031173304,0.00016283599,0.0093636885],"genre_scores_gemma":[0.9871998,0.00004629102,0.012087268,0.00036389136,0.00026175723,0.000007738924,0.000004260261,0.000019311678,0.000009700266],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988169,0.00001875957,0.00029022616,0.00038886463,0.00031407,0.00017119937],"domain_scores_gemma":[0.99943334,0.00014444438,0.000050186558,0.00026638678,0.00005705986,0.000048605863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021828007,0.00021348911,0.00017962407,0.0003826174,0.00007361186,0.00012156979,0.0003595514,0.0004684729,0.00002286604],"category_scores_gemma":[0.00004005992,0.00017583856,0.000036376165,0.00041478913,0.0002029955,0.00015685974,0.000047692,0.001140758,0.000020270865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015514898,0.0000012273617,0.000023410006,0.000010390453,0.000002567279,0.0000038919356,0.00050355156,0.54462403,0.000017105393,0.034265302,0.0000015507226,0.42054546],"study_design_scores_gemma":[0.00013619402,0.00005668464,0.000579775,0.00024900268,0.0000063817733,0.000055442168,0.0000075162334,0.87432986,0.00022067761,0.122219004,0.0018143401,0.00032511423],"about_ca_topic_score_codex":0.000003682441,"about_ca_topic_score_gemma":0.00006983075,"teacher_disagreement_score":0.98558986,"about_ca_system_score_codex":0.0001411531,"about_ca_system_score_gemma":0.00006785171,"threshold_uncertainty_score":0.7170488},"labels":[],"label_agreement":null},{"id":"W3097054013","doi":"10.1155/2020/8834389","title":"Collaboration-Based BIM Model Development Management System for General Contractors in Infrastructure Projects","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and Technology, Taiwan","keywords":"Building information modeling; Process (computing); Construction engineering; Construction management; Process management; Engineering management; Systems engineering; Information model; Project management; Facility management; Engineering; Computer science; Software engineering; Operations management; Business; Civil engineering","score_opus":0.007255022294394344,"score_gpt":0.21144659993231932,"score_spread":0.20419157763792498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097054013","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5413942,0.000049864553,0.45787165,0.00007318049,0.00027599273,0.0002643447,0.000011208118,0.000035795427,0.00002377931],"genre_scores_gemma":[0.8788929,0.000010369586,0.12092787,0.000036109162,0.000051339957,0.000031448268,0.000035279765,0.000012293315,0.0000023624384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992077,0.000005614187,0.00047905667,0.000074532254,0.0001467083,0.0000864366],"domain_scores_gemma":[0.999607,0.000009741941,0.00013874445,0.00003029457,0.00016623444,0.00004797004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000048773465,0.000092737115,0.00014630328,0.000118074306,0.000025129315,0.000017429022,0.000047413196,0.000048986756,0.0000018873471],"category_scores_gemma":[0.0000036572205,0.000090586516,0.000039306666,0.00021109676,0.000005717395,0.00028403985,2.631536e-7,0.00008975966,2.4906748e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001322809,0.00000630204,0.00046683094,0.0002670434,0.000025082269,0.0000048972393,0.0011060942,0.98010445,0.004562261,0.0017346076,0.000029739767,0.01156044],"study_design_scores_gemma":[0.0067156716,0.00017557357,0.06363594,0.00032370668,0.00009836377,0.000005059866,0.0058994815,0.880327,0.03863657,0.00049670006,0.0032766764,0.00040924794],"about_ca_topic_score_codex":2.561785e-7,"about_ca_topic_score_gemma":0.000025467352,"teacher_disagreement_score":0.33749872,"about_ca_system_score_codex":0.00014285768,"about_ca_system_score_gemma":0.000093966155,"threshold_uncertainty_score":0.3694011},"labels":[],"label_agreement":null},{"id":"W3097564098","doi":"10.3390/su12219266","title":"Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Prefabrication; Scheduling (production processes); Engineering; Simulated annealing; Construction management; Transport engineering; Computer science; Operations research; Operations management; Civil engineering","score_opus":0.005096007846219207,"score_gpt":0.2251658062655857,"score_spread":0.22006979841936647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097564098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.993311,0.00016418858,0.004536657,0.0010082938,0.000032361604,0.00027737385,0.000014787537,0.00005418206,0.0006011422],"genre_scores_gemma":[0.99917394,0.000022552122,0.00070109736,0.000033632798,0.000019100142,0.00002830413,0.000009065888,0.0000051925017,0.000007100017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995193,0.000046241494,0.00017681198,0.00012451655,0.000059901202,0.00007325963],"domain_scores_gemma":[0.9995343,0.000032877382,0.000015060763,0.00009067233,0.0002909291,0.000036152513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009931667,0.00006462785,0.00009723133,0.000048763446,0.00003520051,0.000016120961,0.000027139991,0.000044087486,0.000013155031],"category_scores_gemma":[0.00028989417,0.00006553111,0.000013383868,0.00037188758,0.000049105878,0.00014244572,0.000009820936,0.00011835338,0.0000020650843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016356037,0.0001059729,0.21696475,0.0008385032,0.000039229963,0.0000025691704,0.029096019,0.55575013,0.010981441,0.1003967,0.000112721325,0.08554838],"study_design_scores_gemma":[0.000988087,0.00021805115,0.28964907,0.000044835186,0.000020248564,0.0000015646173,0.010517886,0.67688894,0.014503079,0.004603126,0.0022223867,0.0003427508],"about_ca_topic_score_codex":0.00003123738,"about_ca_topic_score_gemma":0.000078543846,"teacher_disagreement_score":0.121138774,"about_ca_system_score_codex":0.00013972989,"about_ca_system_score_gemma":0.000082877516,"threshold_uncertainty_score":0.26722813},"labels":[],"label_agreement":null},{"id":"W3098264249","doi":"10.1061/9780784482889.112","title":"Constraints of Modular Construction for Fully Serviced and Finished Homes: Lessons Learned from Canada","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modular design; Computer science; Modular construction; Architectural engineering; Programming language; Engineering","score_opus":0.05990698903139564,"score_gpt":0.298302155809413,"score_spread":0.23839516677801736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3098264249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96228784,0.001147079,0.016701514,0.010640778,0.0032140631,0.0012539647,0.0020731564,0.00036451453,0.0023170866],"genre_scores_gemma":[0.9936556,0.0004171819,0.00528301,0.00008496623,0.00027365753,0.000089091714,0.00013839535,0.000038502047,0.000019559282],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979139,0.00014184279,0.0005323174,0.00048504054,0.00053328904,0.00039363283],"domain_scores_gemma":[0.99815786,0.0003564827,0.00011391434,0.00025137383,0.0007934193,0.00032693462],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023010593,0.00023985833,0.00042141785,0.00013141306,0.0002257779,0.000108955006,0.00021822291,0.00020435131,0.00057532126],"category_scores_gemma":[0.00036726432,0.00026254478,0.000073812145,0.000521387,0.0009907491,0.00024400915,0.00006161841,0.0004934957,0.0000058888845],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005401392,0.000024511577,0.0072609414,0.0010452587,0.0007148402,0.000026686053,0.00074887334,0.00226945,0.10601926,0.034598526,0.011000263,0.83575124],"study_design_scores_gemma":[0.01683741,0.00091906765,0.016779942,0.000991731,0.0004362737,0.00046766916,0.053994767,0.4294642,0.31831712,0.037375826,0.1211975,0.0032184913],"about_ca_topic_score_codex":0.010954403,"about_ca_topic_score_gemma":0.015185334,"teacher_disagreement_score":0.83253276,"about_ca_system_score_codex":0.00011581391,"about_ca_system_score_gemma":0.00061350723,"threshold_uncertainty_score":0.99998266},"labels":[],"label_agreement":null},{"id":"W3099037304","doi":"10.1061/9780784482865.134","title":"BIM-Based Automated Drafting System in Cabinet Manufacturing","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Rework; Building information modeling; Cabinet (room); Architecture; Automation; Engineering; Systems engineering; Manufacturing engineering; Information model; Information exchange; Computer science; Software engineering; Embedded system; Compatibility (geochemistry); Mechanical engineering","score_opus":0.02753022825820589,"score_gpt":0.2800486264023961,"score_spread":0.2525183981441902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099037304","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96233284,0.0005274603,0.006738446,0.0016706724,0.003222605,0.0010227788,0.00006476735,0.0061487365,0.01827166],"genre_scores_gemma":[0.99805075,0.00001813976,0.0015008133,0.000036546866,0.0002374811,0.00008186633,0.000023514753,0.00003734581,0.000013566896],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99806625,0.00018728545,0.00044511128,0.0003475922,0.0004987071,0.00045507905],"domain_scores_gemma":[0.99921143,0.00012524857,0.000045618042,0.0001968717,0.00019171736,0.0002291371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033966333,0.00019112257,0.00024673226,0.00033234622,0.00016088465,0.00017452806,0.0002122739,0.0001660873,0.0002314342],"category_scores_gemma":[0.00012030852,0.00020359602,0.00005879475,0.0008162881,0.00022090858,0.00024069507,0.000042167532,0.0007354447,0.00016694493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063587853,0.00008716803,0.07061292,0.006367883,0.0004247111,0.0010678861,0.0021620318,0.32907206,0.05674943,0.050648008,0.029753532,0.4524185],"study_design_scores_gemma":[0.0009196116,0.000037694914,0.0012350528,0.0002100059,0.0000063262914,0.000056608562,0.0016928772,0.9414498,0.045848098,0.00004179372,0.008248252,0.00025387292],"about_ca_topic_score_codex":0.000045040175,"about_ca_topic_score_gemma":0.000040213596,"teacher_disagreement_score":0.61237776,"about_ca_system_score_codex":0.0002801509,"about_ca_system_score_gemma":0.0001162316,"threshold_uncertainty_score":0.8302404},"labels":[],"label_agreement":null},{"id":"W3099049182","doi":"10.1061/9780784482865.001","title":"Adoption and Implementation of BIM in Canadian Construction Projects: Benefits, Challenges, and Limitations","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Construction industry; Business; Construction engineering; Engineering management; Engineering","score_opus":0.08331154799407293,"score_gpt":0.30802405219841145,"score_spread":0.22471250420433853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099049182","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98126066,0.009222276,0.00020308039,0.0041431333,0.00063889264,0.0009088453,0.000098482604,0.00013636443,0.003388276],"genre_scores_gemma":[0.9814474,0.01672128,0.0016008391,0.000018961407,0.00008565122,0.000075355005,0.000031150885,0.000017216997,0.0000021207256],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986758,0.00011483507,0.0003622783,0.00028572872,0.00025540442,0.0003059311],"domain_scores_gemma":[0.9991493,0.00010901955,0.00005315119,0.00010331511,0.00030512258,0.00028006235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029525187,0.00013467226,0.00018373517,0.0004789711,0.000115210874,0.000060256054,0.00006639189,0.00013260094,0.000056122688],"category_scores_gemma":[0.00014499761,0.00015423443,0.000021296153,0.0005422896,0.00041333327,0.0003919338,0.000026053418,0.0003342438,0.00000478252],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001931749,0.0000038929443,0.018108787,0.00021182408,0.000030460686,0.0000029333357,0.0013587249,0.00011803906,0.0008761154,0.12256235,0.00012654225,0.85658103],"study_design_scores_gemma":[0.007860246,0.0011386854,0.5754181,0.0008111167,0.00013117606,0.00085289247,0.25758904,0.07029647,0.019299595,0.011642808,0.0531201,0.0018397402],"about_ca_topic_score_codex":0.0048086336,"about_ca_topic_score_gemma":0.08756816,"teacher_disagreement_score":0.8547413,"about_ca_system_score_codex":0.00012125006,"about_ca_system_score_gemma":0.00022122778,"threshold_uncertainty_score":0.9290813},"labels":[],"label_agreement":null},{"id":"W3099645286","doi":"10.1051/shsconf/20208202003","title":"Rétro-BIM ou la question de l’intégration : une revue anachronique","year":2020,"lang":"fr","type":"article","venue":"SHS Web of Conferences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Humanities; Philosophy; Political science","score_opus":0.015600524414763357,"score_gpt":0.2390588068294195,"score_spread":0.22345828241465612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099645286","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061138824,0.0067853243,0.47602883,0.055630483,0.0029531112,0.0004905306,0.000105560226,0.00047751106,0.39638984],"genre_scores_gemma":[0.9940664,0.0013691209,0.0036963134,0.00006683849,0.00045729,0.00001726722,0.000029232024,0.000014695697,0.00028282203],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99896735,0.00018207291,0.00035939782,0.00018620334,0.00012525958,0.00017973162],"domain_scores_gemma":[0.99943495,0.000066786735,0.00011978762,0.000109942615,0.00016213353,0.00010638317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022433567,0.00016966894,0.00022788478,0.0000683876,0.00004366751,0.00006865722,0.00012513954,0.00025199298,0.00060158846],"category_scores_gemma":[0.000078458754,0.00018758496,0.000079780024,0.00027206863,0.00016237328,0.00026939475,0.000012907023,0.00027552232,0.000041357616],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018823108,0.0000149403895,0.0027984413,0.0002765572,0.000038146383,0.0000024855776,0.00024877902,0.0016365268,0.009421546,0.8993588,0.000985899,0.08519906],"study_design_scores_gemma":[0.00080330746,0.00053634105,0.01774817,0.0012857526,0.00021812013,0.000063277985,0.0019199111,0.4118898,0.06272405,0.053640496,0.4484987,0.0006721101],"about_ca_topic_score_codex":0.0022301169,"about_ca_topic_score_gemma":0.0010123028,"teacher_disagreement_score":0.9329276,"about_ca_system_score_codex":0.00006934616,"about_ca_system_score_gemma":0.0021920768,"threshold_uncertainty_score":0.76494926},"labels":[],"label_agreement":null},{"id":"W3100011212","doi":"10.1061/9780784482889.050","title":"Constructability Concepts, Significance, and Implementation","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Constructability; Computer science; Construction engineering; Engineering; Systems engineering","score_opus":0.03454713601727984,"score_gpt":0.3460452894964649,"score_spread":0.3114981534791851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3100011212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9728023,0.0014581975,0.005818972,0.0031606227,0.0021734964,0.0013040149,0.00018543961,0.0009426178,0.012154343],"genre_scores_gemma":[0.99762714,0.00037367988,0.0014767055,0.00008367713,0.0002763602,0.00009300077,0.000026828666,0.000022001148,0.000020621426],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983465,0.00017213466,0.00035759274,0.00037345983,0.00041293507,0.00033735475],"domain_scores_gemma":[0.999017,0.00010483595,0.00004202665,0.00016442308,0.0003690055,0.00030270548],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0002800464,0.00016642215,0.0002048808,0.00009781161,0.00023258815,0.0001683296,0.00013247505,0.0001102907,0.0014999919],"category_scores_gemma":[0.000110068526,0.00017586189,0.00004262892,0.0005665068,0.001040912,0.00035149275,0.0000525763,0.00049495127,0.00006369661],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007769421,0.000008730782,0.036314487,0.0002388045,0.00010986448,0.000013107,0.00086453266,0.00011137246,0.02667423,0.054542422,0.017445993,0.86359876],"study_design_scores_gemma":[0.009363708,0.00092357985,0.050457805,0.0001871237,0.00014512731,0.00078472577,0.07607789,0.090198465,0.19969967,0.021011323,0.5483063,0.0028443167],"about_ca_topic_score_codex":0.000033161698,"about_ca_topic_score_gemma":0.000029656869,"teacher_disagreement_score":0.86075443,"about_ca_system_score_codex":0.00007608011,"about_ca_system_score_gemma":0.00010967824,"threshold_uncertainty_score":0.9994128},"labels":[],"label_agreement":null},{"id":"W3101390094","doi":"10.1061/9780784482858.060","title":"A Building Information Modeling Approach for Adaptive Reuse Building Projects","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reuse; Adaptive reuse; Building information modeling; Context (archaeology); Computer science; Circular economy; Sustainability; Resource (disambiguation); Key (lock); Systems engineering; Risk analysis (engineering); Process management; Engineering; Architectural engineering; Business; Operations management","score_opus":0.07656517656907294,"score_gpt":0.30877127726536685,"score_spread":0.2322061006962939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101390094","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039475538,0.00020046253,0.9545654,0.00049719843,0.00076021336,0.0011706072,0.000054859036,0.00059482234,0.0026809014],"genre_scores_gemma":[0.78644764,0.00006634881,0.21247521,0.000056265217,0.00044833097,0.0004250692,0.000038610797,0.000033379358,0.000009138672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981674,0.000091686095,0.0004514381,0.00031421878,0.0005150351,0.0004602482],"domain_scores_gemma":[0.9984907,0.00010177582,0.00006355843,0.00026682403,0.00085004064,0.0002271265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044718292,0.00020600263,0.00023302223,0.0002986916,0.00035181918,0.00030011704,0.00035327594,0.00018358849,0.000034358585],"category_scores_gemma":[0.0006975131,0.0002172077,0.000096066055,0.0008485668,0.00017984488,0.0012864824,0.00010579707,0.00062903616,0.000017622284],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066157326,0.00002740983,0.00028056826,0.0011484101,0.0003275633,0.0000049510795,0.0029166015,0.42216894,0.022471026,0.21093357,0.017445885,0.3216135],"study_design_scores_gemma":[0.00063617784,0.00008117114,0.000003936432,0.00004929864,0.000013985245,0.000031617652,0.002551418,0.98200595,0.0056117405,0.0017824024,0.0070044296,0.00022785393],"about_ca_topic_score_codex":0.000015689207,"about_ca_topic_score_gemma":0.0000013370504,"teacher_disagreement_score":0.7469721,"about_ca_system_score_codex":0.00016801474,"about_ca_system_score_gemma":0.00014576368,"threshold_uncertainty_score":0.88574725},"labels":[],"label_agreement":null},{"id":"W3101474751","doi":"10.1504/ijspm.2021.10033514","title":"Discrete-event simulation and data analysis for process flow improvements in a cabinet manufacturing facility","year":2020,"lang":"en","type":"article","venue":"International Journal of Simulation and Process Modelling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Cabinet (room); Process (computing); Computer science; Event (particle physics); Engineering; Manufacturing engineering; Engineering drawing; Reliability engineering; Simulation; Operating system; Mechanical engineering","score_opus":0.05267938806846174,"score_gpt":0.3334885804854536,"score_spread":0.28080919241699187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101474751","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3958227,0.00009260743,0.6037567,0.00009651696,0.00006990433,0.000082717124,0.000060669823,0.000011078879,0.0000070501133],"genre_scores_gemma":[0.99814254,0.000036984122,0.001552469,0.00004156934,0.00010878753,0.0000038121732,0.000104990984,0.0000071308336,0.0000017271764],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901533,0.000010848319,0.0004757672,0.0001719362,0.00024430815,0.00008180576],"domain_scores_gemma":[0.99940443,0.0000723222,0.00015281442,0.000057671165,0.000248213,0.00006453683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018731541,0.000106299565,0.00017011339,0.00019515518,0.000034746266,0.00008952003,0.00014514905,0.00005158356,0.0000135876235],"category_scores_gemma":[0.00003981852,0.00009990826,0.00003839912,0.00011431793,0.000013735341,0.0007526144,0.00001884415,0.00012279322,1.8299511e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012340308,0.000008436181,0.0025451668,0.00007752711,0.00015735585,7.12332e-7,0.0008818588,0.9684555,0.000023481352,0.00000990824,5.4982274e-7,0.0277161],"study_design_scores_gemma":[0.00066292175,0.00002315419,0.00043530934,0.00003375546,0.00007255672,0.0000014573416,0.00021462447,0.99702984,0.00033656234,0.0009891547,0.000103530816,0.00009713663],"about_ca_topic_score_codex":0.000004649405,"about_ca_topic_score_gemma":0.000008234693,"teacher_disagreement_score":0.60231984,"about_ca_system_score_codex":0.00003207796,"about_ca_system_score_gemma":0.000019091232,"threshold_uncertainty_score":0.40741408},"labels":[],"label_agreement":null},{"id":"W3102924148","doi":"10.1061/9780784482865.100","title":"The Performance Evaluation of Different Modular Construction Supply Chain Configurations Using Discrete Event Simulation","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Supply chain; Discrete event simulation; Context (archaeology); Computer science; Supply chain management; Event (particle physics); Prefabrication; Service management; Systems engineering; Key (lock); Engineering; Business; Simulation; Civil engineering","score_opus":0.057320993484668264,"score_gpt":0.33704914291914795,"score_spread":0.27972814943447966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3102924148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9722802,0.000542507,0.022684861,0.0006906374,0.0017689739,0.0010774061,0.000050268933,0.00016234504,0.0007427985],"genre_scores_gemma":[0.9986956,0.0003344919,0.000438807,0.000008733224,0.0003198414,0.000109387875,0.000048663438,0.000029847117,0.000014644281],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9967025,0.00052326964,0.0006821547,0.00032785165,0.0014013064,0.00036293382],"domain_scores_gemma":[0.9974619,0.00025187328,0.00016740778,0.0003164975,0.0016288614,0.00017343668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009490392,0.00022296744,0.00024920833,0.00016750423,0.00067021226,0.00016177385,0.00022609475,0.00014995036,0.00030036544],"category_scores_gemma":[0.00037924972,0.00018570427,0.000106242,0.0007302219,0.0007971205,0.00044599676,0.00004889125,0.0005289693,0.000016780341],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008518336,0.000011858351,0.0037769547,0.00010659469,0.00013404811,6.8216946e-7,0.0003436602,0.79459745,0.031564903,0.007897804,0.0001861591,0.16129468],"study_design_scores_gemma":[0.00064208586,0.000070180904,0.0024353282,0.00007527101,0.000058827518,0.000020973308,0.0014307658,0.9685552,0.024842039,0.00054141384,0.0011509282,0.00017698838],"about_ca_topic_score_codex":0.000012462385,"about_ca_topic_score_gemma":0.00001698987,"teacher_disagreement_score":0.17395774,"about_ca_system_score_codex":0.00026642,"about_ca_system_score_gemma":0.00020348515,"threshold_uncertainty_score":0.75728},"labels":[],"label_agreement":null},{"id":"W3103651076","doi":"10.1061/9780784482889.052","title":"A Comparative Study of Offsite Construction Manufacturing Techniques","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Construction industry; Factory (object-oriented programming); Automation; Variance (accounting); Risk analysis (engineering); Manufacturing engineering; Engineering; Construction engineering; Computer science; Business","score_opus":0.056000744286547645,"score_gpt":0.33063580278886495,"score_spread":0.2746350585023173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3103651076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9865239,0.00017029372,0.00276345,0.00024337863,0.0009024671,0.0010118618,0.000032446867,0.00064268295,0.0077094906],"genre_scores_gemma":[0.9964737,0.00008219914,0.0030157599,0.000013727421,0.00024778018,0.00010600325,0.000010461053,0.00002474847,0.000025572579],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99789417,0.00024526735,0.0005436857,0.0003684927,0.00063983235,0.00030857406],"domain_scores_gemma":[0.9988244,0.00011030276,0.000102441634,0.00025575905,0.00050862535,0.00019847137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002493918,0.00021723242,0.00041239028,0.00029050896,0.0001986887,0.00009492495,0.00024147451,0.00013405025,0.00041068107],"category_scores_gemma":[0.000055551795,0.00022261903,0.000071531365,0.00070313626,0.00059563527,0.00035807537,0.00007880854,0.00071909826,0.00004645882],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008534422,0.00036164472,0.026583282,0.00091420097,0.0012691575,0.00008461797,0.013805084,0.0031457676,0.10005409,0.0141602,0.018487023,0.8202815],"study_design_scores_gemma":[0.002365065,0.0012824234,0.0036140715,0.00018515335,0.00008592799,0.00024519555,0.075240545,0.015252092,0.8676926,0.0010903233,0.03213921,0.00080743054],"about_ca_topic_score_codex":0.000036130183,"about_ca_topic_score_gemma":0.00003589403,"teacher_disagreement_score":0.81947404,"about_ca_system_score_codex":0.00008678847,"about_ca_system_score_gemma":0.00006464147,"threshold_uncertainty_score":0.9078141},"labels":[],"label_agreement":null},{"id":"W3104880028","doi":"10.1061/9780784482865.121","title":"BIM-Based Automated Drainage System Design in Prefabrication Construction","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prefabrication; Construction management; Schedule; Engineering; Building information modeling; Drainage; Plan (archaeology); Process (computing); Construction engineering; Systems engineering; Computer science; Civil engineering; Scheduling (production processes)","score_opus":0.04206526126104443,"score_gpt":0.2903254104353058,"score_spread":0.24826014917426137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3104880028","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16851674,0.001389383,0.7659753,0.005442044,0.00786134,0.0052087256,0.00015994142,0.015434367,0.030012134],"genre_scores_gemma":[0.98490965,0.000041381958,0.014405175,0.00004258372,0.00023544714,0.00025870465,0.00004391701,0.0000498692,0.000013280654],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971214,0.00058839464,0.00062233285,0.0005052103,0.000660936,0.0005017418],"domain_scores_gemma":[0.99857146,0.0002324152,0.00009532807,0.00030504135,0.00051901146,0.0002767359],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00065092667,0.00026062314,0.0003197604,0.00051869266,0.0002278557,0.00022001947,0.0002760058,0.0002658144,0.00020219269],"category_scores_gemma":[0.00028160407,0.00028488625,0.000075527256,0.0021078812,0.0005266707,0.00043843494,0.000037493006,0.000752311,0.00021854679],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010936355,0.00012674382,0.01548182,0.0031350306,0.00035923268,0.00028960948,0.0013748987,0.23608696,0.078231476,0.26772502,0.030593172,0.3655024],"study_design_scores_gemma":[0.0011649071,0.00009363416,0.00088737416,0.00017469165,0.000014301207,0.00010124183,0.0019657577,0.97365767,0.017723976,0.00046286674,0.0034333398,0.00032023163],"about_ca_topic_score_codex":0.000029482688,"about_ca_topic_score_gemma":0.000011943659,"teacher_disagreement_score":0.8163929,"about_ca_system_score_codex":0.00047896878,"about_ca_system_score_gemma":0.00026025082,"threshold_uncertainty_score":0.9999603},"labels":[],"label_agreement":null},{"id":"W3105029984","doi":"10.1061/9780784482865.112","title":"Implementation of Building Information Modeling on Construction Site: Addressing the Technology Gap","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Computer science; Virtual reality; Visualization; Leverage (statistics); Field (mathematics); Human–computer interaction; Engineering","score_opus":0.07878585115898361,"score_gpt":0.3558098308802662,"score_spread":0.27702397972128256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105029984","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8775529,0.0003351553,0.10996648,0.005275517,0.0020353755,0.00096042943,0.00008814564,0.00066172105,0.0031242606],"genre_scores_gemma":[0.99642533,0.00015398274,0.003022436,0.00006852878,0.0002052455,0.000073653486,0.000028994817,0.000019395913,0.0000024370281],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99811035,0.00013096065,0.0005986922,0.00021969937,0.0006149016,0.00032542108],"domain_scores_gemma":[0.9986891,0.00009608858,0.00013486751,0.00024105136,0.0007355629,0.000103324244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003767448,0.00017792096,0.0002084184,0.00045034077,0.00037045477,0.00016109609,0.00023352985,0.0001781083,0.0002584723],"category_scores_gemma":[0.00018813416,0.00015552696,0.000068818976,0.001375861,0.00051453145,0.0007664714,0.000064617794,0.000742386,0.000046117966],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011717463,0.000008387703,0.004780346,0.00026066022,0.00012493576,0.0000027257074,0.0011121533,0.04858999,0.02708896,0.12669027,0.0024119075,0.7888125],"study_design_scores_gemma":[0.0015761635,0.00025729224,0.00023310698,0.00024136604,0.000047780733,0.00015870285,0.031585187,0.82914495,0.120312065,0.006288635,0.009699982,0.00045479106],"about_ca_topic_score_codex":0.00003668812,"about_ca_topic_score_gemma":0.0000148490135,"teacher_disagreement_score":0.78835773,"about_ca_system_score_codex":0.00011985735,"about_ca_system_score_gemma":0.00011863405,"threshold_uncertainty_score":0.63422054},"labels":[],"label_agreement":null},{"id":"W3105746603","doi":"10.1016/j.autcon.2020.103447","title":"An A-Star algorithm for semi-optimization of crane location and configuration in modular construction","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"University of Tehran","keywords":"Lift (data mining); Modular design; Plan (archaeology); Renting; A* search algorithm; Engineering; Computer science; Industrial engineering; Transport engineering; Algorithm; Civil engineering; Data mining","score_opus":0.007463724938484093,"score_gpt":0.20980891541327293,"score_spread":0.20234519047478883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105746603","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20225051,0.000069094225,0.79632765,0.00012716769,0.00037104049,0.00051093486,0.000021346597,0.00020334046,0.00011890419],"genre_scores_gemma":[0.88398373,0.000089713605,0.115501165,0.000025083604,0.000083492574,0.00008918003,0.00020625527,0.000020367941,0.000001025583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987403,0.000065323366,0.0006488983,0.00025798642,0.00014989382,0.00013755918],"domain_scores_gemma":[0.99940187,0.000042998137,0.00016248478,0.000114762326,0.00021843659,0.00005945741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016815947,0.00016233306,0.00022749513,0.00032892788,0.000049636914,0.000043160813,0.00005332049,0.00019585581,0.00003715827],"category_scores_gemma":[0.000051200688,0.00019875825,0.00002754299,0.0005992821,0.0001123579,0.00094497035,0.000004237425,0.000124614,0.0000015283075],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032466844,0.000020042775,0.0019063386,0.00020345562,0.000014673391,3.160148e-7,0.000791737,0.60361916,0.015392847,0.009691392,0.000011589271,0.36831596],"study_design_scores_gemma":[0.0010370596,0.00008443438,0.004368116,0.00006281232,0.000015493535,0.000022583656,0.0009919546,0.98092675,0.011202653,0.0010704304,0.00004304677,0.0001746538],"about_ca_topic_score_codex":0.000031949443,"about_ca_topic_score_gemma":0.000030410514,"teacher_disagreement_score":0.6817332,"about_ca_system_score_codex":0.000103611594,"about_ca_system_score_gemma":0.00004477168,"threshold_uncertainty_score":0.8105126},"labels":[],"label_agreement":null},{"id":"W3106331011","doi":"10.18280/ijsdp.150702","title":"Integration of Life Cycle Data in a BIM Object Library to Support Green and Digital Public Procurements","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Workflow; Building information modeling; Sustainability; Life-cycle assessment; Process (computing); Environmental impact assessment; Decision support system; Sustainable design; Environmental economics; Process management; Computer science; Business; Database; Environmental resource management; Engineering; Operations management; Production (economics); Environmental science; Economics","score_opus":0.02726781322083916,"score_gpt":0.2385612398149807,"score_spread":0.21129342659414155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106331011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9915717,0.00019660137,0.0064325756,0.0008064512,0.000117891264,0.00007921057,0.000010305467,0.000015698297,0.00076953863],"genre_scores_gemma":[0.99771625,0.000020433281,0.001961406,0.00011187779,0.000086765416,0.0000020457708,0.000054128785,0.000007314793,0.00003979309],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99924266,0.000006924839,0.00036599924,0.0000843058,0.00020486968,0.000095255586],"domain_scores_gemma":[0.9996144,0.000022355569,0.00008678778,0.00003336319,0.00014638962,0.00009667809],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012230668,0.0000745934,0.00011373944,0.00029607955,0.000019054398,0.00015346128,0.00018313211,0.000030357969,0.000020443218],"category_scores_gemma":[0.00014091023,0.00006872987,0.000009610855,0.00015598715,0.000011490482,0.001589818,0.000101455065,0.000108111075,7.0438375e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073640107,0.00008370094,0.41649356,0.00051975943,0.0006823338,0.00074821815,0.051484164,0.0026938946,0.0012310912,0.006827261,0.0051533007,0.5133463],"study_design_scores_gemma":[0.008135993,0.0010338363,0.39924338,0.0018847408,0.00006676594,0.00057244924,0.2833419,0.06909533,0.009994275,0.0047856723,0.22010589,0.0017397202],"about_ca_topic_score_codex":0.000004192563,"about_ca_topic_score_gemma":0.0000020806572,"teacher_disagreement_score":0.5116066,"about_ca_system_score_codex":0.000031072006,"about_ca_system_score_gemma":0.00016246004,"threshold_uncertainty_score":0.28027225},"labels":[],"label_agreement":null},{"id":"W3108037149","doi":"10.1108/ecam-01-2020-0027","title":"An integrated BIM-based approach for cost estimation in construction projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Agile software development; Process (computing); Estimation; Building information modeling; Computer science; Systems engineering; Cost engineering; TRACE (psycholinguistics); Scheme (mathematics); Industrial engineering; Reliability engineering; Risk analysis (engineering); Engineering; Software engineering; Operations management","score_opus":0.011558966832562047,"score_gpt":0.2072388985586022,"score_spread":0.19567993172604015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108037149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07114941,0.000027260301,0.9253631,0.00012096235,0.0006258627,0.0012895254,0.000023705947,0.0010461155,0.00035401672],"genre_scores_gemma":[0.61495185,0.0000035918165,0.38436088,0.000036837664,0.00007485879,0.00036079134,0.00017528296,0.0000340821,0.0000018285302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865884,0.000029665965,0.00042553802,0.00038515282,0.00018385265,0.00031697843],"domain_scores_gemma":[0.99953896,0.000027628483,0.000058577756,0.00018977295,0.000053698037,0.00013134605],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010479351,0.0003095963,0.00024099923,0.00045382636,0.000073368625,0.00010291836,0.00015140862,0.00010418351,0.00002202304],"category_scores_gemma":[0.000025720496,0.0003239896,0.00008101217,0.00070035865,0.000069471855,0.00027218598,0.00001266332,0.0002858934,0.0000047880885],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045031393,0.000010322437,0.00020813111,0.000260264,0.00003389003,0.0000011706244,0.00012529625,0.7638572,0.000842048,0.008159918,0.000018214492,0.22643855],"study_design_scores_gemma":[0.0010398332,0.000078154815,0.00068354706,0.000051874566,0.000030921452,0.000035097757,0.00054507784,0.993652,0.002215853,0.00014682344,0.0011740011,0.00034685302],"about_ca_topic_score_codex":0.000010083473,"about_ca_topic_score_gemma":0.0000039790457,"teacher_disagreement_score":0.54380244,"about_ca_system_score_codex":0.00017883598,"about_ca_system_score_gemma":0.000021739985,"threshold_uncertainty_score":0.9999212},"labels":[],"label_agreement":null},{"id":"W3110450806","doi":"10.1201/9781003078678-31","title":"Tele-operated shotcrete spraying with the Meyco Robojet Logica","year":2020,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Shotcrete; Computer science; Geology; Geotechnical engineering","score_opus":0.01346413688596095,"score_gpt":0.16832434258339782,"score_spread":0.15486020569743686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110450806","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000034413282,0.00032114075,0.011817101,0.0006439929,0.00022929674,0.00019392782,0.00001275474,0.0005748447,0.98617256],"genre_scores_gemma":[0.23380835,0.0004920683,0.0031362108,0.001785066,0.0009830997,0.000064945954,0.0002112935,0.00028273018,0.7592362],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993466,0.0000059168383,0.00016948878,0.0001973144,0.00015980599,0.00012088784],"domain_scores_gemma":[0.9996336,0.000021581744,0.000034652727,0.0001949314,0.000062626896,0.000052583706],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000032927273,0.0002754446,0.0002088287,0.00004362273,0.00008399335,0.00008537659,0.00013927878,0.0002107353,0.0026764662],"category_scores_gemma":[0.00000231937,0.00015398218,0.000065429434,0.0000420298,0.00005972537,0.000067756744,0.000016241604,0.00048580478,0.00030735164],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003247386,0.0000015268726,0.000008459109,0.000061483835,0.00043988554,0.000031305048,0.00017680241,0.0049070674,0.0010795655,0.9232258,0.041452598,0.028583013],"study_design_scores_gemma":[0.00021930195,0.00008521266,0.000009676427,0.00009636651,0.00011777106,0.000091973045,0.00013641472,0.009270169,0.0008498953,0.0012926896,0.98722273,0.0006078097],"about_ca_topic_score_codex":0.0000068916124,"about_ca_topic_score_gemma":0.000057974943,"teacher_disagreement_score":0.94577014,"about_ca_system_score_codex":0.00003662093,"about_ca_system_score_gemma":0.0000253349,"threshold_uncertainty_score":0.9982352},"labels":[],"label_agreement":null},{"id":"W3110637868","doi":"10.1139/cjce-2020-0346","title":"Optimizing the prefabrication finishing level in modular construction","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Modular construction; Engineering; Range (aeronautics); Frame (networking); Computer science; Civil engineering; Mechanical engineering","score_opus":0.01642939992951922,"score_gpt":0.1735212052624965,"score_spread":0.15709180533297729,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110637868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1764515,0.0031221055,0.8119264,0.0023389205,0.002282244,0.00018039333,0.000013883319,0.000096326694,0.003588226],"genre_scores_gemma":[0.9974766,0.000027647202,0.0022110555,0.000049977287,0.00021238609,0.0000023576392,0.000001103245,0.000016424605,0.000002443186],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994133,0.000010323248,0.00028168192,0.000055723907,0.000085838445,0.00015312641],"domain_scores_gemma":[0.99962723,0.00002323467,0.000048572925,0.00006307651,0.00005591534,0.00018196311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011910247,0.000087149376,0.00011188415,0.00016387521,0.000039867045,0.00006646212,0.0001319383,0.000053818498,0.00004757051],"category_scores_gemma":[0.00009001728,0.00007969058,0.000045657576,0.00027885402,0.00001901383,0.00028661505,0.0000027998872,0.0003327841,0.0000024708354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012025557,4.440716e-7,0.00048427386,0.000019669458,0.000016304528,0.000008745466,0.0010983945,0.9892716,0.002169553,0.0013388384,0.00023805475,0.005352957],"study_design_scores_gemma":[0.00036746266,0.000029520588,0.005879767,0.0001688104,0.000022007693,0.000259973,0.0007700429,0.97410464,0.0020041184,0.00021462585,0.015943661,0.00023536009],"about_ca_topic_score_codex":0.00012591362,"about_ca_topic_score_gemma":0.008676564,"teacher_disagreement_score":0.82102513,"about_ca_system_score_codex":0.00013388947,"about_ca_system_score_gemma":0.000121283905,"threshold_uncertainty_score":0.48417264},"labels":[],"label_agreement":null},{"id":"W3112129799","doi":"10.1061/(asce)cp.1943-5487.0000948","title":"Numerical-Based Approach for Updating Simulation Input in Real Time","year":2020,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Probabilistic logic; Markov chain Monte Carlo; Monte Carlo method; Reliability (semiconductor); Stochastic simulation; Markov chain; Stochastic modelling; Data mining; Mathematical optimization; Algorithm; Bayesian probability; Machine learning; Artificial intelligence; Mathematics; Statistics","score_opus":0.013217769158576573,"score_gpt":0.22581069349179042,"score_spread":0.21259292433321386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112129799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.123245016,0.000039539816,0.8757926,0.000035309902,0.00014895471,0.0000881631,6.63461e-7,0.00008357157,0.00056615454],"genre_scores_gemma":[0.9524966,0.000001873074,0.047213666,0.000020476647,0.00023763119,0.0000016642373,0.0000031211887,0.000024454012,5.438691e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990733,0.0000147683295,0.0005435549,0.00008422457,0.0001253262,0.00015879482],"domain_scores_gemma":[0.99955505,0.00018987578,0.00009980406,0.000045208355,0.00005439162,0.000055653287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002641439,0.00011274211,0.00023295217,0.00020579131,0.000014815714,0.000028274466,0.00009282213,0.00006713561,0.0000056094136],"category_scores_gemma":[0.00013057282,0.00012096864,0.00006751201,0.00034978468,0.0000045116335,0.00012869845,0.000006475181,0.0002826397,8.450842e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011438976,0.000008805894,0.0009358766,0.000102322985,0.000008216192,0.00000196532,0.00023132615,0.99370724,0.0024441115,0.000069861475,0.000019255043,0.0024595729],"study_design_scores_gemma":[0.00056559354,0.000038886483,0.0012847228,0.00011224067,0.00000457836,0.0000052232335,0.000029306397,0.9972435,0.0004696215,0.000009283276,0.00012564445,0.00011139196],"about_ca_topic_score_codex":0.000001932439,"about_ca_topic_score_gemma":6.6998433e-7,"teacher_disagreement_score":0.8292515,"about_ca_system_score_codex":0.000106327454,"about_ca_system_score_gemma":0.000023785751,"threshold_uncertainty_score":0.4932958},"labels":[],"label_agreement":null},{"id":"W3112371688","doi":"10.1007/s00371-021-02155-w","title":"Graph-based generative representation learning of semantically and behaviorally augmented floorplans","year":2021,"lang":"en","type":"article","venue":"The Visual Computer","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Rehabilitation Institute; York University","funders":"National Science Foundation","keywords":"Floorplan; Embedding; Autoencoder; Representation (politics); Node (physics); Graph; Semantics (computer science); Generative model; Enhanced Data Rates for GSM Evolution","score_opus":0.013271570323956065,"score_gpt":0.2607217686973074,"score_spread":0.24745019837335133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112371688","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6745945,0.000039936753,0.32497814,0.00007559948,0.00013610626,0.000037836515,0.0000013296955,0.000050352563,0.000086163185],"genre_scores_gemma":[0.996051,0.00000906148,0.0037703987,0.000043644573,0.000058073765,0.0000042339525,0.000024067404,0.0000072226394,0.000032254735],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959135,0.00005959323,0.00012286534,0.00008279933,0.00008194917,0.00006146195],"domain_scores_gemma":[0.99979293,0.00003228707,0.000020558571,0.00006264843,0.000073821,0.000017763481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004626729,0.00006060354,0.00007803589,0.00003395028,0.00005027022,0.000029012428,0.000028613425,0.000029661715,0.00003415599],"category_scores_gemma":[0.0000032816442,0.00004759302,0.000028047913,0.00012100938,0.00004139763,0.00004369573,0.000013323813,0.00009410535,0.0000025298941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006464824,0.00013164419,0.023650156,0.000112632515,0.00022480468,0.000025263376,0.0023825297,0.19979838,0.59172785,0.014590859,0.001080812,0.16621041],"study_design_scores_gemma":[0.0003540569,0.00010761168,0.015676592,0.000032955508,0.000036815727,0.00001812495,0.00014374522,0.86413884,0.11904539,0.00024136045,0.00010271744,0.0001018079],"about_ca_topic_score_codex":0.00000768152,"about_ca_topic_score_gemma":0.0000069951802,"teacher_disagreement_score":0.66434044,"about_ca_system_score_codex":0.000006184762,"about_ca_system_score_gemma":0.000010682151,"threshold_uncertainty_score":0.19407871},"labels":[],"label_agreement":null},{"id":"W3113011181","doi":"10.29173/mocs188","title":"A Framework for Comparative Evaluation of the Life Cycle Sustainability of Modular and Conventional Buildings","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Process (computing); Multiple-criteria decision analysis; Engineering; Factory (object-oriented programming); Modular construction; Life-cycle assessment; Architectural engineering; Construction engineering; Key (lock); Systems engineering; Computer science; Operations research; Production (economics)","score_opus":0.03029052058977919,"score_gpt":0.27301491978421866,"score_spread":0.24272439919443947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113011181","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94171023,0.00075673696,0.05601166,0.00013529132,0.0003826877,0.00068075454,0.000027922904,0.000047710757,0.0002470041],"genre_scores_gemma":[0.99096316,0.000019433739,0.008824565,0.000012939269,0.00007534868,0.000073364674,0.0000070017063,0.0000126085115,0.000011592115],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987993,0.000026488548,0.00040071853,0.0002408663,0.00038437624,0.00014821175],"domain_scores_gemma":[0.9977639,0.00003852972,0.00019240285,0.000104224055,0.0018005735,0.000100423764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006040206,0.00016661607,0.00028480196,0.00011528709,0.000115029725,0.00004367591,0.0000838867,0.00015890908,0.000014868762],"category_scores_gemma":[0.00027397648,0.00014568951,0.00008859236,0.00026002037,0.0004310626,0.00033392865,0.000034111028,0.00015356897,2.5918567e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000402436,0.00012098874,0.13839455,0.0015570042,0.00055980944,1.2843141e-7,0.0047829556,0.021811415,0.008700802,0.74295485,0.0008296905,0.07988535],"study_design_scores_gemma":[0.0028874706,0.00017694752,0.024129445,0.00023958019,0.0004882336,0.000035689154,0.014355636,0.6499324,0.024425479,0.28072065,0.0021730394,0.00043542383],"about_ca_topic_score_codex":0.000018929484,"about_ca_topic_score_gemma":0.000005328647,"teacher_disagreement_score":0.628121,"about_ca_system_score_codex":0.000095479394,"about_ca_system_score_gemma":0.00010574747,"threshold_uncertainty_score":0.5941046},"labels":[],"label_agreement":null},{"id":"W3114067184","doi":"10.29173/mocs242","title":"Front matter, 2016 MOC Summit proceedings","year":2016,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Modular design; Political science; Geography; Computer science; Meteorology; Physical geography; Operating system","score_opus":0.005974345350090887,"score_gpt":0.19114914004325637,"score_spread":0.18517479469316547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114067184","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20393561,0.020404693,0.01516826,0.0012839233,0.029427694,0.0036394,0.0014628365,0.0027159876,0.7219616],"genre_scores_gemma":[0.32385805,0.027000042,0.012257154,0.0008524486,0.012979406,0.0015029892,0.0009993352,0.0014752181,0.61907536],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956724,0.000014733889,0.0012131508,0.0013795573,0.0006929211,0.0010272188],"domain_scores_gemma":[0.9978233,0.000028847568,0.00050525746,0.0003014757,0.00088301976,0.00045810392],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.00025935858,0.0013126301,0.0011984427,0.0009236894,0.0004942321,0.00079462805,0.00048446248,0.0014497415,0.007964629],"category_scores_gemma":[0.000028219303,0.0011856287,0.0003808611,0.00042174468,0.0005935356,0.0015114222,0.00014925702,0.0011252381,0.00889458],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010498583,0.00003565619,0.00605006,0.0016719099,0.00048857776,0.0000038210137,0.0002690035,0.000018636574,0.007497279,0.0024055676,0.9077735,0.07368099],"study_design_scores_gemma":[0.0015005567,0.0001155261,0.0006603895,0.0016305138,0.00032638496,0.00025420534,0.0009630962,0.0014742111,0.009862404,0.0009561896,0.9801862,0.0020702698],"about_ca_topic_score_codex":0.000053512213,"about_ca_topic_score_gemma":0.000016324324,"teacher_disagreement_score":0.11992246,"about_ca_system_score_codex":0.00042617338,"about_ca_system_score_gemma":0.00011156335,"threshold_uncertainty_score":0.9999625},"labels":[],"label_agreement":null},{"id":"W3114351658","doi":"10.29173/mocs240","title":"Front Matter, 2018 MOC Summit proceedings","year":2018,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Summit; Hollywood; Front (military); Modular design; Engineering; Political science; History; Computer science; Geography; Art history; Physical geography; Operating system; Mechanical engineering","score_opus":0.007392005693353505,"score_gpt":0.19658651180212025,"score_spread":0.18919450610876676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114351658","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39713785,0.011983993,0.007605688,0.00058623025,0.030805318,0.0030880368,0.00089442974,0.002299022,0.54559946],"genre_scores_gemma":[0.48588893,0.016070545,0.026495187,0.0012714068,0.021892197,0.0015899275,0.002084142,0.0018589591,0.44284868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9955967,0.000014381472,0.0012235314,0.0014298436,0.0007279502,0.0010076043],"domain_scores_gemma":[0.99769545,0.000020086918,0.00050637405,0.0003184991,0.0010124885,0.00044708687],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.00027719533,0.0013275131,0.0012011016,0.0009215913,0.0005367654,0.0010053872,0.00051032583,0.0015340028,0.008616378],"category_scores_gemma":[0.00002812384,0.0013824904,0.00036294377,0.0005686987,0.0008133753,0.0013933722,0.00016356011,0.0012770812,0.009155471],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088177934,0.000036281184,0.0057863966,0.0014797804,0.00042677167,0.000002727995,0.00038161472,0.000025194315,0.0031504463,0.0011203488,0.96697634,0.020525899],"study_design_scores_gemma":[0.0012267628,0.000190161,0.00086437893,0.0009829056,0.0004083639,0.00031012116,0.0016329383,0.0047979294,0.009793299,0.0007171916,0.97694135,0.0021345997],"about_ca_topic_score_codex":0.00008283462,"about_ca_topic_score_gemma":0.000034713696,"teacher_disagreement_score":0.10275074,"about_ca_system_score_codex":0.00041484207,"about_ca_system_score_gemma":0.000093029616,"threshold_uncertainty_score":0.9999476},"labels":[],"label_agreement":null},{"id":"W3114576278","doi":"10.1201/9780203752005-26","title":"The Development of High Performance Concrete in North America","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Development (topology); Mathematics","score_opus":0.007544196079012059,"score_gpt":0.17109736295162525,"score_spread":0.1635531668726132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114576278","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06789634,0.00014283038,0.0013842388,0.000009000201,0.0005309717,0.0001129399,0.0000051394227,0.00007512316,0.9298434],"genre_scores_gemma":[0.7195878,0.00074270635,0.005385618,0.000027217357,0.00015878874,0.000026727432,0.00004820977,0.00004899829,0.2739739],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995414,0.0000013423805,0.00024086186,0.00006379626,0.00008307534,0.000069514],"domain_scores_gemma":[0.9997868,0.000012962288,0.000041061114,0.00010529204,0.000041371255,0.000012495554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000025612499,0.00009950939,0.00010949812,0.00004317333,0.00003095483,0.0000068041254,0.0000750429,0.00006706649,0.0005194087],"category_scores_gemma":[0.0000010422823,0.00006879138,0.000017114231,0.000020241292,0.00007051336,0.000025962712,0.000010381082,0.00011002718,0.00011767993],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021666778,6.849439e-7,0.00029501758,0.00011554281,0.00014372036,5.070954e-7,0.0012784824,0.00031889553,0.0000613108,0.04182673,0.003013955,0.9529235],"study_design_scores_gemma":[0.0001354124,0.000030470024,0.0017034374,0.000094805706,0.000008867502,0.0000023191374,0.00007772315,0.002997843,0.0016738723,0.0003488758,0.992647,0.00027936217],"about_ca_topic_score_codex":0.000004405711,"about_ca_topic_score_gemma":0.00039897836,"teacher_disagreement_score":0.9896331,"about_ca_system_score_codex":0.000040324823,"about_ca_system_score_gemma":0.000033423417,"threshold_uncertainty_score":0.5687161},"labels":[],"label_agreement":null},{"id":"W3114709915","doi":"10.29173/mocs177","title":"Modularization Business Case Analysis Tool: Learning from Industry Practices","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Process (computing); Computer science; Process management; Software engineering; Scope (computer science); Business case; Business process; Business analysis; Operations management; Engineering; Business model; Work in process; Business; Marketing; Programming language","score_opus":0.020773948248158272,"score_gpt":0.2196472760852575,"score_spread":0.1988733278370992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114709915","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9543786,0.00039575368,0.04246301,0.00010532336,0.00062877533,0.00015503581,0.0000145802,0.00047446677,0.0013844715],"genre_scores_gemma":[0.99378145,0.000094239826,0.005402349,0.000027850043,0.00034569923,0.000025074281,0.000104941944,0.000035333884,0.00018308978],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857223,0.000025426356,0.00041454454,0.00044086543,0.00029936348,0.00024756434],"domain_scores_gemma":[0.9986882,0.000024260384,0.00029584687,0.00012906341,0.0006811266,0.00018145815],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023494984,0.00028745932,0.00033149787,0.00046810985,0.00025397344,0.00042611168,0.000086526525,0.0004697871,0.000085213826],"category_scores_gemma":[0.00021055671,0.00030366797,0.000080390135,0.0014717738,0.00012910864,0.0014900689,0.00003896638,0.000624993,0.000013142145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092485745,0.0000440444,0.81368643,0.00013765854,0.0013137446,0.00009147963,0.001573393,0.044564836,0.0068719224,0.0052235345,0.0006386829,0.1257618],"study_design_scores_gemma":[0.002060885,0.00008763095,0.045871302,0.0001138014,0.0023737245,0.0018417296,0.017385831,0.89377344,0.0062099085,0.0022922328,0.026491355,0.0014981818],"about_ca_topic_score_codex":0.0003553152,"about_ca_topic_score_gemma":0.0000727423,"teacher_disagreement_score":0.8492086,"about_ca_system_score_codex":0.00010196638,"about_ca_system_score_gemma":0.00004051573,"threshold_uncertainty_score":0.9999415},"labels":[],"label_agreement":null},{"id":"W3116558508","doi":"10.18280/ijdne.150601","title":"Assessing the Applicability of Green Building Information Modelling for Existing Green Buildings","year":2020,"lang":"en","type":"article","venue":"International Journal of Design & Nature and Ecodynamics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Green building; Building information modeling; Architectural engineering; Sustainability; Construction engineering; Engineering; Efficient energy use; Systems engineering; Computer science; Operations management","score_opus":0.02280853003981419,"score_gpt":0.26853049929075856,"score_spread":0.24572196925094436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3116558508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11135364,0.00018595843,0.88714826,0.0007566594,0.0003221372,0.0000955434,0.000011011738,0.000016419322,0.000110393376],"genre_scores_gemma":[0.93719906,0.000050434595,0.062310826,0.00014382169,0.00027900722,0.000002762855,0.0000047778535,0.000007796833,0.00000149612],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991953,0.000015691383,0.000449075,0.000056628323,0.0002074879,0.000075838485],"domain_scores_gemma":[0.9990317,0.00017840361,0.0002668585,0.000041140276,0.00044299377,0.000038897146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003532247,0.000087334214,0.00013205889,0.00008930491,0.000052081487,0.00010546893,0.00020416146,0.00011035763,0.0000021113274],"category_scores_gemma":[0.00007302497,0.00006764066,0.00007595599,0.00009307586,0.000028970402,0.00086408964,0.000017496608,0.00034648305,1.59637e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014023061,0.000012174887,0.0006491388,0.00016736574,0.0002854579,0.0000015202428,0.0016981084,0.69263226,0.009001992,0.024447476,0.000127251,0.27083704],"study_design_scores_gemma":[0.00025560698,0.00003509623,0.000095885815,0.000053656724,0.000029694385,0.00004575583,0.0003684437,0.98957264,0.0011590652,0.006913217,0.0014004232,0.0000705048],"about_ca_topic_score_codex":0.000009564267,"about_ca_topic_score_gemma":0.0000015800626,"teacher_disagreement_score":0.8258454,"about_ca_system_score_codex":0.000050914907,"about_ca_system_score_gemma":0.000028418306,"threshold_uncertainty_score":0.27583063},"labels":[],"label_agreement":null},{"id":"W3118571087","doi":"10.1108/ci-05-2020-0081","title":"Tracking major resources for automated progress monitoring of construction activities: masonry work case","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Field (mathematics); Computer science; Data collection; Heuristics; Work (physics); Proof of concept; Systems engineering; Engineering; Construction engineering; Data mining; Mechanical engineering","score_opus":0.016623825842240727,"score_gpt":0.2540318101950187,"score_spread":0.23740798435277796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118571087","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95097387,0.0002553802,0.043274682,0.000051976807,0.0036115511,0.00028748202,0.000040739815,0.0010270713,0.00047727674],"genre_scores_gemma":[0.93504804,0.000015654045,0.06430307,0.0000052931146,0.00037699973,0.000121972196,0.000054302538,0.00003593997,0.000038696387],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998617,0.00003975896,0.0006882122,0.0002552999,0.0001861442,0.00021361437],"domain_scores_gemma":[0.99863195,0.00007906847,0.0002592398,0.00020685917,0.0007901267,0.000032733635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001652474,0.00020155874,0.00024585862,0.00042140606,0.00021309592,0.000111173125,0.000056620076,0.00022023785,0.00005791825],"category_scores_gemma":[0.00007818958,0.00023633805,0.000073851596,0.0017657131,0.00023290145,0.0005260095,0.000012755663,0.00019197325,0.0000016821461],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011538976,0.000043626682,0.059617676,0.000638039,0.00029631096,0.00003809258,0.0010254028,0.002301772,0.058453374,0.037311494,0.00045184133,0.83970696],"study_design_scores_gemma":[0.0031695308,0.00011735629,0.011891453,0.0010074086,0.0002593171,0.01149057,0.029377598,0.02714909,0.9032061,0.0036925185,0.007419193,0.0012198684],"about_ca_topic_score_codex":0.0000033810572,"about_ca_topic_score_gemma":0.0000026082337,"teacher_disagreement_score":0.8447527,"about_ca_system_score_codex":0.00013006557,"about_ca_system_score_gemma":0.0000690757,"threshold_uncertainty_score":0.9637586},"labels":[],"label_agreement":null},{"id":"W3118671466","doi":"","title":"The Financial Impact of Unmanned Aerial Vehicles on Construction Project Management","year":2017,"lang":"en","type":"article","venue":"URSCA Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Systems engineering; Engineering; Project management; Construction management; Construction engineering; Engineering management; Risk analysis (engineering); Process management; Computer science; Business; Civil engineering","score_opus":0.009982670753267397,"score_gpt":0.24345007051365677,"score_spread":0.23346739976038938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118671466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95595354,0.000034286197,0.00008136997,0.00007009047,0.001031055,0.0002743607,0.0000056614012,0.00011383808,0.042435817],"genre_scores_gemma":[0.9992335,0.000070507536,0.0002595111,0.000003355026,0.000248978,0.000034545563,0.0000012805073,0.000011447424,0.00013688834],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994648,0.000002064692,0.00015428926,0.00010467922,0.000128593,0.00014553493],"domain_scores_gemma":[0.9996802,0.0000072478524,0.00009752852,0.000119709475,0.00007455295,0.000020754964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000084511434,0.00010748067,0.00009459924,0.00006042012,0.00034959297,0.00015357991,0.00017939633,0.000063589454,0.00000886305],"category_scores_gemma":[0.00003413614,0.0000747926,0.000077047596,0.000055722765,0.00013328709,0.00019224036,0.000019223586,0.00009736966,0.000007916315],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005664699,0.00004219527,0.008793811,0.00018895075,0.00026397328,0.0000016355564,0.0008881789,0.00022638548,0.01002838,0.3000056,0.02896168,0.6500327],"study_design_scores_gemma":[0.007982494,0.0024267426,0.6174829,0.0010349329,0.0004151426,0.00019824266,0.0049446397,0.044895425,0.17525046,0.04928897,0.09388827,0.0021917743],"about_ca_topic_score_codex":0.00002272117,"about_ca_topic_score_gemma":0.000005499875,"teacher_disagreement_score":0.6478409,"about_ca_system_score_codex":0.00006264269,"about_ca_system_score_gemma":0.000016561227,"threshold_uncertainty_score":0.3049954},"labels":[],"label_agreement":null},{"id":"W3118835968","doi":"10.1139/cjce-2020-0230","title":"Integrating 3D modeling, sustainability and cost estimating at the conceptual design stage of bridges","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Bridge (graph theory); Sustainability; Conceptual design; Conceptual model; Systems engineering; Computer science; Process (computing); Footprint; Interoperability; Engineering; Conceptual framework; Software engineering; Database","score_opus":0.01363741765953633,"score_gpt":0.2053487243678734,"score_spread":0.19171130670833708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118835968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18327439,0.0022983302,0.8135161,0.00007028389,0.0004620576,0.0000762587,0.000012108779,0.00001633125,0.0002741463],"genre_scores_gemma":[0.9941006,0.000017546554,0.0057053263,0.000009148464,0.00008339639,0.0000029607284,0.0000014084134,0.000017345943,0.00006230787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992568,0.000028580454,0.00035477188,0.00007147314,0.000099327866,0.00018905866],"domain_scores_gemma":[0.9992005,0.00010977029,0.0000665936,0.000103016006,0.00034358897,0.00017648439],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030641313,0.00011209333,0.00017696572,0.00009666524,0.00008205212,0.000049518316,0.00008157862,0.00005469026,0.00010759098],"category_scores_gemma":[0.0004935717,0.00009667129,0.000048849368,0.00013109614,0.00007100085,0.00015211474,0.000009452954,0.00026557472,2.3769209e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001444163,8.175351e-7,0.0004734172,0.00006169344,0.000025804498,0.000018134402,0.0007385987,0.9924945,0.00075050123,0.00109871,0.00008910945,0.004247273],"study_design_scores_gemma":[0.00013865906,0.000015799846,0.00012873515,0.000113791364,0.000016000115,0.00019619228,0.002138893,0.9943801,0.0017406764,0.000071888215,0.0009642415,0.000094982744],"about_ca_topic_score_codex":0.00048619183,"about_ca_topic_score_gemma":0.027936246,"teacher_disagreement_score":0.8108262,"about_ca_system_score_codex":0.00030514222,"about_ca_system_score_gemma":0.00044120097,"threshold_uncertainty_score":0.9898014},"labels":[],"label_agreement":null},{"id":"W3118889388","doi":"","title":"Construction data preparation framework using fuzzy approach","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Fuzzy logic; Data mining; Artificial intelligence","score_opus":0.07756464800044906,"score_gpt":0.2624573120774001,"score_spread":0.18489266407695104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118889388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03515584,0.000053315234,0.8004143,0.0000019743727,0.00069533585,0.00008633165,0.0000058518626,0.00035853943,0.1632285],"genre_scores_gemma":[0.65186465,0.000009221861,0.3479232,0.0000091819,0.00010409365,0.0000041532453,0.000035352296,0.0000096144295,0.000040504827],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995228,0.000011589338,0.00014980377,0.00015096173,0.00007232433,0.00009253294],"domain_scores_gemma":[0.9995489,0.000006202723,0.00002130691,0.00036509114,0.000028414133,0.000030059426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000060158458,0.00008060385,0.000067414076,0.000052087496,0.000050552306,0.000027491307,0.00011767336,0.000105510364,0.00022262066],"category_scores_gemma":[0.000009419703,0.000076497716,0.000015295722,0.00012925765,0.00003834233,0.0004567157,0.000021036483,0.00010654628,0.00002772003],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055280034,0.00007532589,0.0051640407,0.00010877512,0.00018900228,0.0000012106215,0.0021859198,0.0069427774,0.005308714,0.8223982,0.004176754,0.153394],"study_design_scores_gemma":[0.00016242702,0.0000212775,0.00072648056,0.000024102605,0.0000513618,0.00015577063,0.0011567598,0.962046,0.007140134,0.025848854,0.0023292168,0.00033757975],"about_ca_topic_score_codex":0.000031623036,"about_ca_topic_score_gemma":0.0000045133943,"teacher_disagreement_score":0.9551033,"about_ca_system_score_codex":0.000023383198,"about_ca_system_score_gemma":0.000015014455,"threshold_uncertainty_score":0.31194866},"labels":[],"label_agreement":null},{"id":"W3119149896","doi":"","title":"Comparative study of life-cycle costing for sustainable infrastructure rehabilitation using Markov Decision Process and directed genetic algorithms","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Markov decision process; Activity-based costing; Process (computing); Computer science; Genetic algorithm; Life cycle costing; Markov chain; Markov process; Operations research; Algorithm; Operations management; Machine learning; Engineering; Business; Mathematics; Statistics","score_opus":0.009865473563501977,"score_gpt":0.25762550499077963,"score_spread":0.24776003142727765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119149896","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93765277,0.000096180614,0.061218124,0.000002051696,0.00006221758,0.00064676785,0.0000022146437,0.00010140268,0.00021824831],"genre_scores_gemma":[0.9436926,0.000003942826,0.056208223,0.000002275831,0.000025180765,0.00003793705,0.0000026062653,0.000010715293,0.000016500871],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993485,0.000020672604,0.00026583386,0.00013757154,0.00010917226,0.0001182469],"domain_scores_gemma":[0.9992791,0.00018015456,0.000051231513,0.000075773394,0.0003739554,0.000039807368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059773414,0.00010164318,0.00018333326,0.00010619128,0.00014215457,0.00001719984,0.000037233483,0.000050983486,0.000014702649],"category_scores_gemma":[0.00012298227,0.000092031456,0.00001777987,0.00024154433,0.00004219574,0.00018862527,0.000010029124,0.00005964616,1.249654e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037551197,0.0002560459,0.13866094,0.00075665786,0.00020607065,0.0000037359468,0.033311047,0.7465483,0.0032239668,0.00028659453,0.00077691785,0.07559423],"study_design_scores_gemma":[0.000980229,0.00023945801,0.123747766,0.000023617173,0.000021314734,0.000012944888,0.027987571,0.84530115,0.0005050466,0.0010289153,0.000020880712,0.00013113061],"about_ca_topic_score_codex":0.000051539035,"about_ca_topic_score_gemma":0.000026913387,"teacher_disagreement_score":0.09875284,"about_ca_system_score_codex":0.000044542845,"about_ca_system_score_gemma":0.00003320432,"threshold_uncertainty_score":0.3752934},"labels":[],"label_agreement":null},{"id":"W3119469403","doi":"","title":"Constructability assessment framework using BIM technology","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Constructability; Construction engineering; Engineering; Computer science; Systems engineering; Forensic engineering","score_opus":0.008873200495029942,"score_gpt":0.26274492559071,"score_spread":0.25387172509568007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119469403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42027476,0.000052001913,0.5575077,0.0002225695,0.000392238,0.000060172053,0.0000010642203,0.00062255684,0.020866923],"genre_scores_gemma":[0.86009187,0.000004930595,0.13981046,0.000045288754,0.000034186272,0.0000018858902,6.4486045e-7,0.0000037394204,0.000007021067],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995993,0.000005676993,0.0001326332,0.00009196495,0.000058991216,0.00011148467],"domain_scores_gemma":[0.9997685,0.000010815745,0.000011446435,0.00015197466,0.000032655607,0.000024587587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000035677327,0.00007335312,0.00008334421,0.000088636225,0.00004063242,0.000019549308,0.000052418523,0.00014055171,0.00040400692],"category_scores_gemma":[0.000009639126,0.00006732986,0.000023693516,0.00024138867,0.000047930884,0.00007155726,0.0000044859535,0.00018221642,0.000009619069],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.45889e-7,0.000009014391,0.0074093062,0.0000044820963,0.000009630742,6.73506e-7,0.000010027313,0.0009876274,0.009078627,0.81182355,0.00004986441,0.17061633],"study_design_scores_gemma":[0.0002743092,0.00007204784,0.017837122,0.00004761173,0.00002436408,0.0001447276,0.00067180843,0.17660213,0.030496579,0.7704974,0.0028849773,0.00044697462],"about_ca_topic_score_codex":0.000002274594,"about_ca_topic_score_gemma":0.0000018742863,"teacher_disagreement_score":0.43981707,"about_ca_system_score_codex":0.00006830082,"about_ca_system_score_gemma":0.000017765595,"threshold_uncertainty_score":0.44235924},"labels":[],"label_agreement":null},{"id":"W3119677942","doi":"","title":"An evaluation of architects' readiness for conducting energy modelling using BIM tools to achieve high energy performance buildings in the UK and Canada","year":2020,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Architectural engineering; Energy consumption; Engineering; Process (computing); Building design; Zero-energy building; Efficient energy use; Work (physics); Energy (signal processing); Engineering design process; Civil engineering; Computer science; Mechanical engineering","score_opus":0.04846247594753966,"score_gpt":0.25756853283578623,"score_spread":0.20910605688824657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119677942","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85800564,0.000068652545,0.14090869,0.00002089331,0.0003995005,0.00019224444,0.000016569067,0.000021450405,0.000366339],"genre_scores_gemma":[0.99453944,0.000028146012,0.0046901153,0.000049699152,0.00011631535,0.0001090679,0.00041684552,0.000030320012,0.000020065096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989174,0.000043944023,0.0003582457,0.00022365035,0.00030743142,0.00014931188],"domain_scores_gemma":[0.9994289,0.00007293502,0.000095591146,0.00012958399,0.00023052293,0.00004244645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025822324,0.0001917217,0.00022349594,0.00015838574,0.000077260614,0.0000558923,0.00012586286,0.00011580851,0.000007917513],"category_scores_gemma":[0.00002463823,0.00016643232,0.000024673614,0.00022037621,0.000008614092,0.00016097797,0.0000042429087,0.00012083296,1.9550809e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060293438,0.0000037664443,0.000039038398,0.00015193902,0.000026683994,1.4313791e-7,0.000903213,0.888852,0.014323484,0.017759632,0.000017324579,0.07786246],"study_design_scores_gemma":[0.00018789174,0.000047987814,0.00005717051,0.00013056863,0.00006376553,0.0000036093747,0.0027012965,0.9580373,0.037755303,0.0006835408,0.00012263996,0.00020888833],"about_ca_topic_score_codex":0.2795556,"about_ca_topic_score_gemma":0.5161442,"teacher_disagreement_score":0.23658863,"about_ca_system_score_codex":0.00013147917,"about_ca_system_score_gemma":0.00024541744,"threshold_uncertainty_score":0.7252419},"labels":[],"label_agreement":null},{"id":"W3119776155","doi":"","title":"Construction space simulation application-CSSA","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Space (punctuation); Computer science","score_opus":0.0032482734114195775,"score_gpt":0.18685785630137144,"score_spread":0.18360958288995186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119776155","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043110393,0.00003937683,0.84382266,0.000060820497,0.0002879949,0.00008954858,0.000001675282,0.0005950414,0.11199247],"genre_scores_gemma":[0.9940665,0.0000027091894,0.0052456562,0.000009872069,0.00016545074,0.000016315149,0.000019207066,0.000008777498,0.0004655338],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966633,0.000004123556,0.000117775715,0.00007606781,0.00006582364,0.000069868205],"domain_scores_gemma":[0.99982685,0.0000145106205,0.000015080739,0.00008859877,0.00003959696,0.00001537708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000020819445,0.00006186943,0.000045859644,0.00004959516,0.000040778763,0.000022736487,0.000024799327,0.000053433218,0.00016823645],"category_scores_gemma":[0.00000184656,0.00006162607,0.000021135342,0.0001246147,0.000022833308,0.00012271939,0.0000020731861,0.000046051166,0.0001291709],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020217399,0.0000058925425,0.0033498143,0.000008721094,0.000006203601,9.863068e-8,0.000010345047,0.59251916,0.007815152,0.32567176,0.0017208139,0.06889],"study_design_scores_gemma":[0.0001557449,0.0000044809713,0.0043946737,0.000002857331,0.000007264865,0.000008974984,0.000055987588,0.92266196,0.010906842,0.010922154,0.050738115,0.00014091899],"about_ca_topic_score_codex":0.00005328694,"about_ca_topic_score_gemma":0.000047177025,"teacher_disagreement_score":0.9509561,"about_ca_system_score_codex":0.000034287314,"about_ca_system_score_gemma":0.000004520551,"threshold_uncertainty_score":0.25130382},"labels":[],"label_agreement":null},{"id":"W3119926992","doi":"","title":"Synthèse comparative des Méthodes d’évaluation de la vulnérabilité sismique des bâtiments","year":2020,"lang":"fr","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.07418289552947421,"score_gpt":0.3098975114119336,"score_spread":0.2357146158824594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119926992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46368307,0.0026421573,0.50402075,0.00067574496,0.00024001619,0.00019085618,0.00001542028,0.00022462466,0.028307375],"genre_scores_gemma":[0.8306723,0.00026408143,0.16782327,0.00013503284,0.00016184436,0.000041941777,0.000009994101,0.000021794285,0.00086969574],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983234,0.00070001883,0.00031975308,0.00024129376,0.00014726668,0.00026828807],"domain_scores_gemma":[0.99904674,0.00046801416,0.000045729936,0.00011435952,0.00014080522,0.0001843675],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005117351,0.00022421985,0.00022687217,0.000049556842,0.00016488506,0.00013685464,0.00009845033,0.00021207189,0.0017579352],"category_scores_gemma":[0.00022890589,0.00023461881,0.000093116556,0.00028892944,0.00048184342,0.00045300822,0.000023208213,0.0002725367,0.0002530957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000079386984,0.00017467326,0.025924379,0.00068964635,0.0003722814,0.00000822969,0.032368463,0.10245775,0.05863064,0.38781023,0.002783293,0.38870102],"study_design_scores_gemma":[0.00073029305,0.0001938326,0.021612793,0.00030114836,0.00018668993,0.000069844486,0.0065492257,0.6300907,0.21279691,0.11941252,0.0074940603,0.0005619562],"about_ca_topic_score_codex":0.0003744142,"about_ca_topic_score_gemma":0.00011798243,"teacher_disagreement_score":0.527633,"about_ca_system_score_codex":0.0003155683,"about_ca_system_score_gemma":0.00010383066,"threshold_uncertainty_score":0.99915457},"labels":[],"label_agreement":null},{"id":"W3120006218","doi":"10.1016/j.jobe.2021.102159","title":"The dynamic evolution of synergies between BIM and sustainability: A text mining and network theory approach","year":2021,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sustainability; Building information modeling; Certification; Computer science; Social sustainability; Knowledge management; Process management; Engineering; Business; Operations management; Management; Economics","score_opus":0.0032260887627596204,"score_gpt":0.1915197053558742,"score_spread":0.18829361659311458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120006218","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62811303,0.009023666,0.36258128,0.000025940908,0.0001776173,0.00002470259,6.1067095e-7,0.000021164233,0.000031990054],"genre_scores_gemma":[0.9879381,0.0002698591,0.011643312,8.3671915e-7,0.00012318496,0.0000015902168,2.845259e-7,0.00001338305,0.000009464853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994014,0.00002042615,0.0002859801,0.00006260538,0.00009930869,0.00013030715],"domain_scores_gemma":[0.99942845,0.0002571428,0.000074301206,0.00007521321,0.00012756797,0.00003731853],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046977194,0.00008625977,0.00017269027,0.000081309394,0.00006535436,0.0000437077,0.000051989595,0.000053835145,6.3217794e-7],"category_scores_gemma":[0.00017056121,0.00006849569,0.000042068106,0.000183146,0.000040003088,0.00013527877,0.000023679582,0.0001616778,1.172533e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015763664,0.000006237345,0.008022538,0.0004474602,0.00028323053,0.0000057159796,0.00047315317,0.8341232,0.0067946035,0.05862673,0.000047877722,0.09115352],"study_design_scores_gemma":[0.0006673609,0.00009470366,0.04132246,0.00063822686,0.0002419219,0.0008252791,0.007532695,0.92236936,0.002462071,0.021952111,0.0014908566,0.00040298223],"about_ca_topic_score_codex":9.0908594e-7,"about_ca_topic_score_gemma":8.5660184e-7,"teacher_disagreement_score":0.35982507,"about_ca_system_score_codex":0.00010192431,"about_ca_system_score_gemma":0.00003550708,"threshold_uncertainty_score":0.27931732},"labels":[],"label_agreement":null},{"id":"W3120018482","doi":"10.1108/ohi-01-2013-b0003","title":"A Computer-Based System for Mass Customization of Prefabricated Housing","year":2013,"lang":"en","type":"article","venue":"Open House International","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Mass customization; Housing industry; Architectural engineering; Prefabrication; Globe; Personalization; Engineering; Business; Modularity (biology); Marketing; Telecommunications; Civil engineering","score_opus":0.01368458525468981,"score_gpt":0.22610366295886314,"score_spread":0.21241907770417334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120018482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056911033,0.000007396878,0.9368698,0.00008727458,0.0011208807,0.00058655575,0.000029774465,0.00029168854,0.0040955935],"genre_scores_gemma":[0.9639434,0.0000010301211,0.03566104,0.000019209814,0.00009807599,0.00015107436,0.00004337175,0.000027015976,0.000055760072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994841,0.000010783959,0.00023029369,0.000098235294,0.00010447038,0.00007207661],"domain_scores_gemma":[0.99954444,0.00003086869,0.00007065591,0.00009114202,0.00023911608,0.00002376927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000057277288,0.000074070806,0.00010084507,0.00009147241,0.000029654562,0.0001334699,0.00023441478,0.00004641982,0.000095343974],"category_scores_gemma":[0.000006700179,0.00007302651,0.000037002646,0.00007794577,0.000014628099,0.00028811372,0.000016650345,0.00003703117,0.00003091459],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013635423,0.00013089576,0.00579709,0.00038876565,0.00043357452,0.0000013656315,0.00026497606,0.7184897,0.08543046,0.02042279,0.031503003,0.13700101],"study_design_scores_gemma":[0.000666734,0.000019411284,0.00059688813,0.000078192395,0.000008655201,0.0000024419126,0.000041213334,0.97131056,0.024635298,0.00006585406,0.002484101,0.000090646296],"about_ca_topic_score_codex":0.00008374459,"about_ca_topic_score_gemma":0.00000703081,"teacher_disagreement_score":0.9070324,"about_ca_system_score_codex":0.000103941755,"about_ca_system_score_gemma":0.00002266432,"threshold_uncertainty_score":0.29779345},"labels":[],"label_agreement":null},{"id":"W3120180031","doi":"","title":"Enhancing construction claims analysis using computer simulation","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science","score_opus":0.008542091541658109,"score_gpt":0.21440711842962362,"score_spread":0.2058650268879655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120180031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40767115,0.0000061031283,0.5908374,0.000004156299,0.00026927638,0.000044899174,3.388519e-7,0.00017024149,0.0009964496],"genre_scores_gemma":[0.9460051,0.0000015323754,0.0537971,0.000020683286,0.00012388667,0.000003881681,0.000007256323,0.0000071367895,0.000033441473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995497,0.000010190305,0.00018074509,0.0000911323,0.00007408541,0.00009414369],"domain_scores_gemma":[0.99976426,0.000019487217,0.000021368813,0.00008802898,0.000074972544,0.000031855885],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000027646052,0.000076207085,0.00009772431,0.00018398017,0.000052363528,0.000068143934,0.000025865555,0.00006135719,0.0012166374],"category_scores_gemma":[0.0000013038099,0.000071693015,0.000061768005,0.00038584424,0.000018449222,0.00031233733,0.000004795558,0.000059427923,0.00007831615],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.551567e-7,0.0000016096922,0.0021311264,0.0000047293506,0.00010750377,6.056561e-8,0.000046242796,0.949557,0.0074514,0.0010499731,0.00002618668,0.0396238],"study_design_scores_gemma":[0.00005402721,0.0000033350186,0.002601516,0.0000033457566,0.00006830943,0.0000031795419,0.00009049438,0.99194014,0.004691997,0.0003823051,0.00007297942,0.00008839786],"about_ca_topic_score_codex":0.00005891647,"about_ca_topic_score_gemma":0.000031753978,"teacher_disagreement_score":0.53833395,"about_ca_system_score_codex":0.00004862874,"about_ca_system_score_gemma":0.000004403213,"threshold_uncertainty_score":0.9996964},"labels":[],"label_agreement":null},{"id":"W3120476599","doi":"10.29173/mocs162","title":"Implementation of Prefabrication and Modular Offsite Construction using BIM and Lean Construction Techniques","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Lean construction; Engineering; Construction management; Schedule; Construction engineering; Productivity; Construction waste; Building information modeling; Construction industry; Architectural engineering; Transport engineering; Operations management; Civil engineering; Computer science; Waste management","score_opus":0.01466718059163039,"score_gpt":0.23346497834709798,"score_spread":0.2187977977554676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120476599","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9626612,0.00093318254,0.03446237,0.00006783027,0.00050476776,0.00054677535,0.000033479027,0.0003664853,0.00042391208],"genre_scores_gemma":[0.9414496,0.0007019552,0.057508036,0.000018720375,0.00019182531,0.000036044712,0.000035951245,0.00004550572,0.000012387094],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9981164,0.000025386358,0.00070253335,0.0005239447,0.00033585442,0.00029588348],"domain_scores_gemma":[0.99871755,0.000015810101,0.00033305478,0.00015024072,0.00056647306,0.00021689027],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003193688,0.00038062938,0.00042668253,0.00056768215,0.00023523721,0.00017881898,0.00007651448,0.00028789,0.00001775242],"category_scores_gemma":[0.000026125992,0.00041666,0.00006235621,0.00047369502,0.00067679235,0.001319306,0.00005629886,0.00025586114,0.0000012497205],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007898871,0.00001884974,0.20602094,0.00040290516,0.0001407212,0.000001062435,0.0008918976,0.00011324327,0.096392356,0.041993193,0.000091591086,0.65385425],"study_design_scores_gemma":[0.0076366365,0.0009940595,0.05829158,0.00092288275,0.0013379344,0.0054792375,0.06430592,0.13778234,0.6626362,0.038836952,0.018297652,0.0034786214],"about_ca_topic_score_codex":0.00015806631,"about_ca_topic_score_gemma":0.000027091763,"teacher_disagreement_score":0.65037566,"about_ca_system_score_codex":0.00014950921,"about_ca_system_score_gemma":0.00005521094,"threshold_uncertainty_score":0.9998285},"labels":[],"label_agreement":null},{"id":"W3120988520","doi":"","title":"Agent-based modeling and simulation of earthmoving operations","year":2015,"lang":"en","type":"article","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Task (project management); Engineering; Constraint (computer-aided design); Set (abstract data type); Resource (disambiguation); Representation (politics); Truck; Industrial engineering; Computer science; Simulation; Systems engineering","score_opus":0.04116181705861633,"score_gpt":0.26121885866326977,"score_spread":0.22005704160465345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120988520","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9224209,0.00007603621,0.06381204,0.00006157022,0.00018550929,0.000114166156,0.000002353145,0.00009441835,0.013232989],"genre_scores_gemma":[0.9992884,0.000007963382,0.00018720058,0.0000014524794,0.00006192792,7.5621153e-7,0.0000033160393,0.000010006205,0.00043899336],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925447,0.00009683911,0.000120912715,0.00013617595,0.0002270491,0.00016455023],"domain_scores_gemma":[0.9994596,0.000048597645,0.000012364538,0.00014781683,0.00020037436,0.0001312368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018971915,0.00007078402,0.00009309857,0.00040766617,0.00016122291,0.000047931782,0.000085971435,0.00006570842,0.000008595184],"category_scores_gemma":[0.00002746297,0.00008181153,0.00003108748,0.0003383866,0.00009458448,0.0002770697,0.000026434822,0.00019097612,0.000004716322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024183559,0.000007603739,0.004789896,0.000016612777,0.0000149006355,0.000010124722,0.00012231278,0.9882513,0.004190561,0.0018611238,0.000023631192,0.00068770605],"study_design_scores_gemma":[0.00031651102,0.000057776648,0.00071806414,0.00001679008,0.000007966077,0.0000035232447,0.0006896357,0.9891672,0.007835543,0.00011994996,0.0009891094,0.00007792098],"about_ca_topic_score_codex":0.0013462467,"about_ca_topic_score_gemma":0.0011132993,"teacher_disagreement_score":0.07686746,"about_ca_system_score_codex":0.00016211254,"about_ca_system_score_gemma":0.00016089543,"threshold_uncertainty_score":0.33361775},"labels":[],"label_agreement":null},{"id":"W3121023415","doi":"","title":"A comparison of des and SD for simulating construction operation","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematics","score_opus":0.02152620729274591,"score_gpt":0.2680055662489356,"score_spread":0.24647935895618972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121023415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.74380726,0.000047511425,0.25393268,0.000008740314,0.00008191881,0.000117918804,7.985399e-7,0.00005323798,0.0019499246],"genre_scores_gemma":[0.96703815,0.0000030403437,0.03288412,0.0000030451126,0.000019425877,0.000019513262,0.0000031243062,0.0000039220704,0.000025632231],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976784,0.0000031440263,0.00012483278,0.000038727412,0.000024096727,0.000041365856],"domain_scores_gemma":[0.9998668,0.00002311703,0.0000139999,0.000027224962,0.000055777684,0.0000131181005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000018856412,0.000036135032,0.00006118276,0.000025868283,0.000036471276,0.000021260106,0.000009795508,0.00002915683,0.0000878044],"category_scores_gemma":[0.000008103985,0.000032233365,0.000010682129,0.000027032067,0.000034751905,0.00016065223,0.00000196096,0.000020310481,0.0000022294105],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004072349,0.000008175192,0.06190244,0.000110728965,0.000023409795,5.7542366e-9,0.0008306803,0.02864778,0.100282535,0.03840755,0.00032234928,0.76946026],"study_design_scores_gemma":[0.00015117391,0.000023667275,0.00323593,0.0000098846585,0.00000507265,0.000002196526,0.00092991913,0.945357,0.048027385,0.0021071443,0.00010351074,0.00004708992],"about_ca_topic_score_codex":0.000024067644,"about_ca_topic_score_gemma":0.000017547756,"teacher_disagreement_score":0.91670924,"about_ca_system_score_codex":0.000007853846,"about_ca_system_score_gemma":0.000002308455,"threshold_uncertainty_score":0.13144384},"labels":[],"label_agreement":null},{"id":"W3121749086","doi":"10.29173/mocs241","title":"Front matter, 2015 MOC Summit proceedings","year":2015,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Summit; Front (military); Modular design; Political science; Engineering; Computer science; Geography; Operating system; Physical geography; Mechanical engineering","score_opus":0.009094887801055232,"score_gpt":0.20975921333359598,"score_spread":0.20066432553254077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121749086","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26695788,0.029894562,0.005919748,0.0010483434,0.029619465,0.0037478718,0.0011764066,0.002735792,0.65889996],"genre_scores_gemma":[0.4824773,0.015156705,0.021739637,0.0010657025,0.014967935,0.0017405425,0.002908174,0.0019066159,0.45803738],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9955843,0.000016215363,0.0012131229,0.0013248783,0.00089457125,0.0009668974],"domain_scores_gemma":[0.9971558,0.000018021221,0.0004924365,0.00029897873,0.001433413,0.00060134265],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.00037255994,0.0013189742,0.0012817681,0.0009362421,0.00041036136,0.0009549095,0.00048832066,0.0015062669,0.004141085],"category_scores_gemma":[0.000036490783,0.0013731126,0.00032348043,0.00057733984,0.00052576396,0.0014739787,0.00016049056,0.0014849387,0.00621987],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008188156,0.0000335515,0.004577552,0.001171592,0.00034052716,0.000003488945,0.00038937968,0.00009030459,0.0015517031,0.001067477,0.97104293,0.019649604],"study_design_scores_gemma":[0.0014615159,0.00014218959,0.00044087728,0.00074645464,0.0003900101,0.00033251598,0.0023900142,0.0057444354,0.0037196889,0.0009003616,0.9817009,0.0020310243],"about_ca_topic_score_codex":0.000093655966,"about_ca_topic_score_gemma":0.000032487813,"teacher_disagreement_score":0.21551943,"about_ca_system_score_codex":0.0005358457,"about_ca_system_score_gemma":0.0001482653,"threshold_uncertainty_score":0.9999562},"labels":[],"label_agreement":null},{"id":"W3122925454","doi":"10.29173/ijic236","title":"Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Nevada, Las Vegas","keywords":"Schedule; Virtual reality; Modular design; Computer science; Plan (archaeology); Systems engineering; Engineering management; Construction engineering; Human–computer interaction; Engineering; Operating system","score_opus":0.023343636918016084,"score_gpt":0.288660164596957,"score_spread":0.26531652767894087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122925454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9156186,0.00007321625,0.081252225,0.00021965856,0.002392026,0.00016220385,0.000066659864,0.000027956929,0.00018746081],"genre_scores_gemma":[0.99660236,0.00008986857,0.0026885003,0.000022161861,0.0005147622,0.000008476616,0.000053371958,0.000015594534,0.000004897393],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984922,0.00013390923,0.0007120792,0.00016828829,0.00038874694,0.000104816456],"domain_scores_gemma":[0.9982779,0.00006341734,0.00044136462,0.00015200188,0.000985155,0.00008015929],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030549988,0.0001528386,0.00026706388,0.0002869811,0.00007037621,0.00008879077,0.00012404058,0.0002181044,0.0000352536],"category_scores_gemma":[0.0001442492,0.00015382683,0.00009180022,0.00023854297,0.00014652459,0.00044860228,0.000019548721,0.0003746405,9.632029e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021750957,0.00035691427,0.0026655397,0.00003808664,0.0013114847,0.00047754828,0.0006590014,0.016040917,0.14299473,0.2540948,0.00023993419,0.57894593],"study_design_scores_gemma":[0.021808416,0.0018954725,0.0010270039,0.0005753829,0.0005544426,0.039301354,0.016402172,0.1406301,0.7540347,0.017218824,0.0055084946,0.0010436464],"about_ca_topic_score_codex":0.00009595897,"about_ca_topic_score_gemma":0.000023945675,"teacher_disagreement_score":0.61103994,"about_ca_system_score_codex":0.00016642231,"about_ca_system_score_gemma":0.00023125108,"threshold_uncertainty_score":0.62728757},"labels":[],"label_agreement":null},{"id":"W3123138904","doi":"10.1155/2021/8833058","title":"Digital Twins and Road Construction Using Secondary Raw Materials","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Horizon 2020 Framework Programme; European Commission","keywords":"Demolition; Raw material; Construction engineering; Work (physics); Road construction; Parallels; Engineering; Civil engineering; Computer science; Transport engineering; Operations management; Mechanical engineering","score_opus":0.005829596639802246,"score_gpt":0.20940272963017922,"score_spread":0.20357313299037696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123138904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9803678,0.00041555183,0.017789137,0.000016226542,0.0011483026,0.00002895034,0.000028579809,0.000022165765,0.00018329345],"genre_scores_gemma":[0.9920285,0.00017787924,0.007615541,0.000008811246,0.0001146687,5.076044e-7,0.000032690295,0.000010547293,0.000010876372],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99943054,0.0000071692366,0.00034615723,0.0000577652,0.000094690615,0.00006369975],"domain_scores_gemma":[0.9996618,0.000007995731,0.00010933071,0.00003751888,0.00014552721,0.000037812642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000032860247,0.0000733179,0.00013312261,0.000065207234,0.000031815227,0.000050710765,0.000017719212,0.00004675216,0.000069908325],"category_scores_gemma":[0.0000056978724,0.00007408668,0.000037379577,0.00008625575,0.000026785425,0.0008929352,5.1550677e-7,0.0000970701,6.0346406e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047587047,0.000010334076,0.00082522444,0.00006516766,0.00006122918,0.000033436783,0.00045228307,0.037141923,0.6811909,0.00081170903,0.000011380452,0.27934882],"study_design_scores_gemma":[0.0030803508,0.00013197263,0.21427953,0.0003710102,0.00019346047,0.0023765024,0.0053668153,0.00084370404,0.7649209,0.004461217,0.0034881008,0.00048645338],"about_ca_topic_score_codex":7.647926e-7,"about_ca_topic_score_gemma":0.000008640305,"teacher_disagreement_score":0.27886236,"about_ca_system_score_codex":0.000027545113,"about_ca_system_score_gemma":0.000038735725,"threshold_uncertainty_score":0.30211672},"labels":[],"label_agreement":null},{"id":"W3124916602","doi":"10.1007/s11831-021-09545-2","title":"Integration of BIM and GIS for Construction Automation, a Systematic Literature Review (SLR) Combining Bibliometric and Qualitative Analysis","year":2021,"lang":"en","type":"article","venue":"Archives of Computational Methods in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Automation; Computer science; Systems engineering; Geographic information system; Robot; Construction engineering; Data science; Engineering management; Engineering; Artificial intelligence; Operations management; Remote sensing","score_opus":0.020745270271691228,"score_gpt":0.3570799097212898,"score_spread":0.33633463944959857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124916602","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013854812,0.031901944,0.9537891,0.000027927048,0.000090610614,0.0002325552,0.000024062374,0.000034968176,0.000044010703],"genre_scores_gemma":[0.22084686,0.0030250545,0.7760086,0.0000049691953,0.0000067824585,0.000045467623,0.000052413227,0.000008329405,0.0000015323984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988799,0.00019677203,0.0006053554,0.0001353549,0.000109130706,0.00007347235],"domain_scores_gemma":[0.9974486,0.0021339357,0.00013831377,0.000076231976,0.00017464148,0.0000282345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005380032,0.00011391267,0.00045750898,0.0056404737,0.00001945641,0.00002267104,0.00003715817,0.000041414893,0.0000019880556],"category_scores_gemma":[0.00075866276,0.00011477937,0.00007116684,0.009006096,0.00004710604,0.00015505603,0.000012885812,0.00009151249,2.7963505e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015365958,0.000034535973,0.00030048875,0.17043495,0.0011210915,0.0000013379911,0.011592801,0.45255762,0.04261892,0.14395824,0.000005327972,0.17735931],"study_design_scores_gemma":[0.00027223345,0.000027919963,0.0054944255,0.015710525,0.00024652664,0.000034060187,0.0008536051,0.95729905,0.004603999,0.015324173,0.0000037043487,0.00012979661],"about_ca_topic_score_codex":0.0000011796805,"about_ca_topic_score_gemma":0.0000012252981,"teacher_disagreement_score":0.50474143,"about_ca_system_score_codex":0.000011889016,"about_ca_system_score_gemma":0.000015754222,"threshold_uncertainty_score":0.50329363},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"systematic_review","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"systematic_review","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"agree"},{"id":"W3125454972","doi":"10.14488/bjopm.2021.007","title":"A Multi-Objective Scheduling Algorithm for Multi-Mode Resource Constrained Projects in the Presence of Uncertain Resource Availability","year":2021,"lang":"en","type":"article","venue":"Brazilian Journal of Operations & Production Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Fair-share scheduling; Dynamic priority scheduling; Genetic algorithm scheduling; Mathematical optimization; Job shop scheduling; Heuristic; Rate-monotonic scheduling; Operations research; Industrial engineering; Engineering; Mathematics; Artificial intelligence","score_opus":0.027289861930830592,"score_gpt":0.28336254524699805,"score_spread":0.25607268331616745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125454972","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09711819,0.0008194371,0.8964449,0.0019431388,0.00089136465,0.0020474084,0.000035321373,0.00006095386,0.00063926174],"genre_scores_gemma":[0.47978014,0.00007604736,0.51901567,0.000061138315,0.00023354062,0.00014660945,0.000022238637,0.00002214897,0.00064243696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983948,0.00022264203,0.0007039841,0.00024587792,0.00026364825,0.00016904196],"domain_scores_gemma":[0.99894875,0.000056261004,0.00013140067,0.00030336366,0.0005226779,0.00003751573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001009005,0.00014869278,0.00021097972,0.0002389004,0.00016572165,0.00008131972,0.00019322106,0.00005655265,0.00001961973],"category_scores_gemma":[0.000308611,0.00012410888,0.00010910384,0.0005996766,0.00011911857,0.00033419824,0.000021614931,0.00026719217,0.0000013196525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007734068,0.0005505106,0.00044154385,0.00032101411,0.00029103522,0.000021369335,0.008261453,0.8141984,0.009802224,0.0019073791,0.0014721903,0.16265555],"study_design_scores_gemma":[0.0028313245,0.00017908188,0.0038031517,0.0004577822,0.00016804288,0.00035345656,0.056607056,0.89853865,0.025390495,0.00017348428,0.011123565,0.00037393294],"about_ca_topic_score_codex":0.0000094400075,"about_ca_topic_score_gemma":0.00013065709,"teacher_disagreement_score":0.38266197,"about_ca_system_score_codex":0.0001263565,"about_ca_system_score_gemma":0.000107115266,"threshold_uncertainty_score":0.5061013},"labels":[],"label_agreement":null},{"id":"W3125617660","doi":"10.1108/jfm-08-2020-0055","title":"Integrating BIM into sensor-based facilities management operations","year":2021,"lang":"en","type":"article","venue":"Journal of Facilities Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Building information modeling; Facility management; Workflow; Computer science; Systems engineering; Building automation; Information model; Database; Engineering; Scheduling (production processes); Operations management","score_opus":0.010639114642672262,"score_gpt":0.212513856490712,"score_spread":0.20187474184803975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125617660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20933504,0.002135511,0.6485004,0.0015860655,0.0041218917,0.0004603555,0.000094826384,0.00034490926,0.13342102],"genre_scores_gemma":[0.89634025,0.00068639807,0.07530964,0.0002606964,0.00021364824,0.000049010432,0.000034006083,0.000033116692,0.027073229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850065,0.000058818638,0.00067637255,0.00014657724,0.0004033217,0.00021424962],"domain_scores_gemma":[0.99931717,0.0000312158,0.00006524618,0.00024036148,0.0002679531,0.000078063116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021907198,0.00020622219,0.0002454327,0.0003055394,0.00014793438,0.00020244106,0.00016274935,0.000055417593,0.00063874346],"category_scores_gemma":[0.000019340909,0.00019032542,0.00018040878,0.00024336242,0.000061260886,0.0003239725,0.000043135264,0.0002380297,0.000039142036],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006424949,0.00018171525,0.00056602515,0.003139973,0.0017854691,0.00055874477,0.005005382,0.40136084,0.0015313524,0.26510382,0.016124556,0.3045779],"study_design_scores_gemma":[0.0018175186,0.00016597428,0.000625323,0.00056851044,0.0002323509,0.00014724034,0.20429774,0.03129884,0.0077350936,0.0055035823,0.7468788,0.0007290289],"about_ca_topic_score_codex":0.000020242222,"about_ca_topic_score_gemma":0.000059732814,"teacher_disagreement_score":0.73075426,"about_ca_system_score_codex":0.0002454496,"about_ca_system_score_gemma":0.00003306534,"threshold_uncertainty_score":0.77612454},"labels":[],"label_agreement":null},{"id":"W3127370760","doi":"","title":"Transformer le secteur de la construction par le numérique : Un chantier ambitieux et nécessaire","year":2021,"lang":"fr","type":"preprint","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Humanities; Art","score_opus":0.00578896271993426,"score_gpt":0.21216906251094583,"score_spread":0.20638009979101157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127370760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5504749,0.0024527928,0.39110214,0.009004853,0.0057596946,0.00052506966,0.00009743502,0.0005112011,0.04007192],"genre_scores_gemma":[0.9809015,0.002123092,0.012626225,0.00015025868,0.0005739256,0.00019160843,0.0002059119,0.00014298254,0.0030844877],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99714285,0.0006275391,0.000577784,0.0007312335,0.0003247669,0.0005957991],"domain_scores_gemma":[0.99870396,0.00011481576,0.00019203842,0.00053019525,0.00023340728,0.00022556791],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0005554114,0.0006650628,0.00063311675,0.00021002551,0.00037052092,0.00057175494,0.00025589846,0.0013217852,0.0007668922],"category_scores_gemma":[0.000052916934,0.0008065363,0.00041232668,0.00040141758,0.00044613125,0.00053555233,0.000064422224,0.0019518534,0.00006064549],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001603069,0.00039524614,0.0073150354,0.0018053533,0.0013203477,0.0001953646,0.033744905,0.04954623,0.05792741,0.6477593,0.0033875934,0.19644286],"study_design_scores_gemma":[0.0042664157,0.0001302729,0.0294486,0.0027769804,0.00033619898,0.0038547227,0.047505412,0.023373494,0.501702,0.02272517,0.36014205,0.003738672],"about_ca_topic_score_codex":0.0024457378,"about_ca_topic_score_gemma":0.0025818571,"teacher_disagreement_score":0.62503415,"about_ca_system_score_codex":0.00030319867,"about_ca_system_score_gemma":0.0012605586,"threshold_uncertainty_score":0.9999747},"labels":[],"label_agreement":null},{"id":"W3128497859","doi":"10.46354/i3m.2019.mas.016","title":"An integrated simulation-based construction crew allocation and trade-off with energy and carbon footprint","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Crew; Environmental science; Carbon footprint; Energy consumption; Framing (construction); Environmental engineering; Engineering; Civil engineering","score_opus":0.004124298135839496,"score_gpt":0.18390281920555968,"score_spread":0.17977852106972017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128497859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88373893,0.00007420099,0.11264586,0.000066784436,0.00014751701,0.000118708434,0.000001642565,0.00027388215,0.0029324978],"genre_scores_gemma":[0.9975462,0.000016958367,0.00230772,0.000028829114,0.000022422397,0.000010283687,0.000023413826,0.000015191286,0.000029007011],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952763,0.00001893596,0.00013007873,0.00016026397,0.00007953741,0.000083576306],"domain_scores_gemma":[0.9997314,0.00003567537,0.000023526727,0.00011214779,0.000042099327,0.000055158365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003495766,0.00011764171,0.00009748835,0.000090511705,0.00002986527,0.000051711424,0.00002315284,0.00008198276,0.000029639654],"category_scores_gemma":[0.0000029226612,0.00009711694,0.000009152791,0.000113185095,0.000049467133,0.00008988489,0.000001993908,0.00006186134,4.2718278e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006979979,0.000017568484,0.021931143,0.000059430924,0.000043562326,4.6912368e-7,0.0001529483,0.4040628,0.0162017,0.032135006,0.0000036305426,0.5253219],"study_design_scores_gemma":[0.000445611,0.000101929516,0.0032520473,0.000023205634,0.0000117024865,0.000009611037,0.00032935484,0.9841723,0.010308579,0.00014164009,0.0010542471,0.00014976591],"about_ca_topic_score_codex":0.0001478756,"about_ca_topic_score_gemma":0.00021086108,"teacher_disagreement_score":0.5801095,"about_ca_system_score_codex":0.000031392694,"about_ca_system_score_gemma":0.00002178337,"threshold_uncertainty_score":0.3960314},"labels":[],"label_agreement":null},{"id":"W3128757296","doi":"10.1061/(asce)ae.1943-5568.0000459","title":"Application of Multiagent Simulation for Maintenance Workflow Management and Resource Allocation in Hospital Buildings","year":2021,"lang":"en","type":"article","venue":"Journal of Architectural Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workflow; Resource allocation; Process (computing); Computerized maintenance management system; Discrete event simulation; Preventive maintenance; Computer science; Component (thermodynamics); Predictive maintenance; Resource (disambiguation); Proactive maintenance; Process management; Operations research; Operations management; Risk analysis (engineering); Systems engineering; Engineering; Reliability engineering; Simulation; Business","score_opus":0.0036182559128587408,"score_gpt":0.19577046341580534,"score_spread":0.1921522075029466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128757296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42494056,0.00025908553,0.5744968,0.00007375333,0.00010169336,0.000099559686,9.012362e-7,0.000011768136,0.000015871654],"genre_scores_gemma":[0.95092845,0.000043900538,0.048939116,0.0000037747814,0.00005444157,0.0000098913815,0.0000026660198,0.000010349197,0.000007418135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947196,0.0000048589677,0.00029971512,0.00006449885,0.00007531887,0.00008362041],"domain_scores_gemma":[0.99972284,0.000051138853,0.00007345727,0.000054881017,0.00007146038,0.000026201975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008972537,0.00007164531,0.000112042035,0.0001394549,0.00001075016,0.000011255802,0.00004049357,0.00003034364,8.451914e-7],"category_scores_gemma":[0.000031784635,0.00006934331,0.000044929653,0.00013665277,0.000008070736,0.00008055931,0.000008507398,0.00009248754,6.966415e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015253317,0.0000063902535,0.000116484414,0.000094950716,0.000020338564,9.83245e-7,0.00018282105,0.84041816,0.0063579218,0.0006781557,0.0000042762267,0.15210426],"study_design_scores_gemma":[0.0006960907,0.0000381271,0.007942994,0.00016326107,0.00001578996,0.000032225176,0.00009582872,0.98069113,0.007924574,0.0002835759,0.0020286741,0.000087721026],"about_ca_topic_score_codex":9.628566e-7,"about_ca_topic_score_gemma":0.0000017860334,"teacher_disagreement_score":0.52598786,"about_ca_system_score_codex":0.000050606213,"about_ca_system_score_gemma":0.000004219975,"threshold_uncertainty_score":0.2827738},"labels":[],"label_agreement":null},{"id":"W3128993237","doi":"","title":"Cost management-based BIM: skills, implementation and teaching map","year":2021,"lang":"en","type":"book-chapter","venue":"BCU Open Access Repository (Birmingham City University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Building information modeling; Process (computing); Engineering management; Facility management; Engineering; Process management; Knowledge management; Computer science; Construction engineering; Systems engineering; Operations management; Business","score_opus":0.02954533593008739,"score_gpt":0.28162181703746947,"score_spread":0.25207648110738207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128993237","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016494935,0.00014275352,0.010386236,0.000051226933,0.0011853484,0.00095587544,0.000057104284,0.000278823,0.98529315],"genre_scores_gemma":[0.10335222,0.00035254375,0.0045584138,0.00015886384,0.00034974562,0.000020690743,0.00066354254,0.00016791455,0.8903761],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986864,0.00004497036,0.00030052767,0.0005180006,0.00023740556,0.00021270353],"domain_scores_gemma":[0.9991622,0.000035071458,0.00019059435,0.0003844196,0.00010138988,0.00012633666],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.000099016645,0.0003459872,0.00033260963,0.00050339743,0.0004954771,0.0011771183,0.00079011865,0.00025070342,0.000374031],"category_scores_gemma":[0.000001963211,0.00045745695,0.0001059399,0.00007235779,0.00007595334,0.0013330738,0.0006069445,0.0004625882,0.000009830155],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000085431806,0.000086662396,0.0042704362,0.0010460741,0.0012001571,0.0015292737,0.00020900196,0.00079542265,0.0003323591,0.69395,0.011639796,0.28485537],"study_design_scores_gemma":[0.0011901717,0.00002605069,0.0009502251,0.000522785,0.00037990903,0.0000460082,0.00071680895,0.00051131623,0.0013613299,0.00043567628,0.99300724,0.00085249066],"about_ca_topic_score_codex":0.00020774716,"about_ca_topic_score_gemma":0.00030447208,"teacher_disagreement_score":0.9813674,"about_ca_system_score_codex":0.00041751063,"about_ca_system_score_gemma":0.00008969094,"threshold_uncertainty_score":0.99985975},"labels":[],"label_agreement":null},{"id":"W3129015247","doi":"10.1108/ci-05-2020-0068","title":"A hybrid simulation approach for microtunneling construction planning","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Plan (archaeology); Interdependence; Discrete event simulation; Process (computing); Computer science; Industrial engineering; Engineering; Operations research; Systems engineering; Simulation","score_opus":0.024398989342731554,"score_gpt":0.24914816127401412,"score_spread":0.22474917193128258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129015247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20400175,0.0001690487,0.7906535,0.000029434766,0.001851115,0.00024425844,0.000027610948,0.00047907484,0.0025441654],"genre_scores_gemma":[0.7981021,0.000009947272,0.20047304,0.00005783457,0.0004742131,0.00011054462,0.0006773736,0.00003729991,0.000057633697],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998677,0.000027508719,0.0005996752,0.00031358819,0.00016106601,0.00022116075],"domain_scores_gemma":[0.99867517,0.00005835312,0.00014388748,0.00019194861,0.00089601777,0.000034620964],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015778474,0.00020254274,0.00019465422,0.00035961266,0.00025280056,0.00012909817,0.00005651132,0.0001527021,0.000076721844],"category_scores_gemma":[0.000096614174,0.00024646265,0.000071368966,0.0008005684,0.00009479472,0.00048140806,0.000010912431,0.00020335476,0.000007663215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037277292,0.000020226149,0.0012677183,0.00017246004,0.00007525305,0.000001372811,0.0001248598,0.56628734,0.13547076,0.07546223,0.0006054441,0.22047505],"study_design_scores_gemma":[0.0010109944,0.000021827873,0.00022092405,0.000058935722,0.00004817725,0.00048334763,0.0011186507,0.76448697,0.21390961,0.008571164,0.009629103,0.00044031424],"about_ca_topic_score_codex":8.663815e-7,"about_ca_topic_score_gemma":2.3214497e-7,"teacher_disagreement_score":0.59410036,"about_ca_system_score_codex":0.00014224612,"about_ca_system_score_gemma":0.00007958106,"threshold_uncertainty_score":0.99999875},"labels":[],"label_agreement":null},{"id":"W3129431246","doi":"10.1016/j.procs.2021.01.264","title":"Simulation of ground bearing pressure profile under hydraulic crane outrigger mats for the verification of 16-point combined loading","year":2021,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Outrigger; Finite element method; Computer science; Modular design; Structural engineering; Point (geometry); Bearing (navigation); Hydraulic pressure; Marine engineering; Mechanical engineering; Mathematics; Engineering; Artificial intelligence; Geometry","score_opus":0.016421453650551754,"score_gpt":0.23381779564716576,"score_spread":0.217396341996614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129431246","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07548859,0.00021803209,0.92311317,0.0000891195,0.00059415714,0.00026282255,0.0000033045542,0.00005513709,0.00017567622],"genre_scores_gemma":[0.99174017,0.000006495916,0.00810775,0.000018876177,0.000068199304,0.00002625643,0.0000047449803,0.000006858355,0.000020641546],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999292,0.0000077591485,0.0002261189,0.00016088253,0.0001999759,0.00011322174],"domain_scores_gemma":[0.9991293,0.00014627684,0.00007904023,0.00017270955,0.00044832053,0.00002434566],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021784435,0.000070372065,0.000104223174,0.00006379906,0.00009566265,0.00005390561,0.00016170663,0.000035040466,0.000010304859],"category_scores_gemma":[0.00005498642,0.00005767195,0.00003188861,0.000481883,0.000105547726,0.00032736338,0.000029901023,0.00005973367,0.0000012850663],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011204353,0.000026188409,0.00022853709,0.00029037596,0.000024944196,6.5099876e-8,0.00075489335,0.9075809,0.050317314,0.008832231,0.000041498795,0.031891827],"study_design_scores_gemma":[0.00016037427,0.000023770568,0.0044837915,0.000038538667,0.000015898426,0.0000019474185,0.0000520859,0.90115273,0.093016505,0.0008855638,0.00011068548,0.000058102036],"about_ca_topic_score_codex":0.0000056166887,"about_ca_topic_score_gemma":0.0000022852992,"teacher_disagreement_score":0.9162516,"about_ca_system_score_codex":0.00003146679,"about_ca_system_score_gemma":0.00007858699,"threshold_uncertainty_score":0.23517938},"labels":[],"label_agreement":null},{"id":"W3130658053","doi":"10.22215/etd/2016-11404","title":"Urban Systems: How Can a Parametric Building Information Model Serve to Democratize, Optimize and Challenge the Master Planning Process at Carleton University?","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Parametric statistics; Computer science; Process (computing); Visualization; Resource (disambiguation); Variety (cybernetics); Parametric model; Building information modeling; Architectural engineering; Data science; Operations research; Industrial engineering; Engineering; Data mining; Artificial intelligence; Operations management; Programming language","score_opus":0.01144243084999849,"score_gpt":0.19743130849423957,"score_spread":0.18598887764424107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130658053","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6924824,0.0019309846,0.23323713,0.0015420357,0.002596693,0.002947613,0.0002971409,0.0011047632,0.06386124],"genre_scores_gemma":[0.9889862,0.00010830304,0.0005898969,0.0000396986,0.00007708952,0.00005041569,0.00017797238,0.00003254645,0.009937909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991692,0.000022060854,0.00021098822,0.00017673352,0.00021820904,0.00020283203],"domain_scores_gemma":[0.99941695,0.00004122882,0.00011141867,0.00016251694,0.00017868487,0.000089232395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008001632,0.00026210526,0.00022165653,0.00042505903,0.00020396424,0.0001879508,0.00015205072,0.0002716509,0.000008824411],"category_scores_gemma":[0.000015665002,0.00019004579,0.000043024906,0.00028157045,0.000011372863,0.0008803087,0.000018414206,0.00019078006,0.000004878727],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040942748,0.0000151822815,0.0008759671,0.004254611,0.0006080032,0.000008440901,0.034780733,0.89718676,0.00052424753,0.022250561,0.015328394,0.023757687],"study_design_scores_gemma":[0.0006016364,0.00004945753,0.00016504464,0.00082499045,0.00013172062,0.000020387026,0.026147861,0.9669834,0.00057332363,0.00008324663,0.003730315,0.00068864063],"about_ca_topic_score_codex":0.00005596951,"about_ca_topic_score_gemma":0.00012380873,"teacher_disagreement_score":0.29650378,"about_ca_system_score_codex":0.00032042235,"about_ca_system_score_gemma":0.00005147368,"threshold_uncertainty_score":0.77498424},"labels":[],"label_agreement":null},{"id":"W3131928659","doi":"","title":"Projects For Sale - 2473 Atkins Avenue- Coquitlam- British Columbia - Price $0","year":2018,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Economics","score_opus":0.010081871353932736,"score_gpt":0.20382618369806088,"score_spread":0.19374431234412814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3131928659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69238085,0.00014559354,0.07445845,0.000072485236,0.003202231,0.00088875316,0.000099770004,0.0011943233,0.22755754],"genre_scores_gemma":[0.98072255,0.00001286314,0.003952303,0.000088843415,0.00051836565,0.00014863534,0.00001608794,0.000023418444,0.014516935],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996078,0.000003866304,0.00009921327,0.00009781194,0.000056643104,0.00013466006],"domain_scores_gemma":[0.9997826,0.000012220325,0.00001270296,0.0000851427,0.000076851225,0.000030434685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000038959417,0.000043837746,0.000064045336,0.000014611781,0.00008660161,0.00015238613,0.00005250476,0.000059195478,0.0008192399],"category_scores_gemma":[0.000014847848,0.000067847985,0.000029626293,0.00008842279,0.00003818554,0.00009806092,0.0000063164443,0.0000426604,0.000069440604],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006381514,0.000025027863,0.002997939,0.00010225433,0.000046838177,0.0000017623279,0.00031433077,0.000014779643,0.003393742,0.002639589,0.8533999,0.13705748],"study_design_scores_gemma":[0.00056095415,0.00013439657,0.008138176,0.00005090361,0.000017010258,0.00007888195,0.00017760957,0.012844931,0.0039817584,0.001447975,0.9722966,0.00027077907],"about_ca_topic_score_codex":0.0010094215,"about_ca_topic_score_gemma":0.02314557,"teacher_disagreement_score":0.2883417,"about_ca_system_score_codex":0.000029951645,"about_ca_system_score_gemma":0.000017804436,"threshold_uncertainty_score":0.99467945},"labels":[],"label_agreement":null},{"id":"W3133047794","doi":"10.29173/mocs243","title":"Front matter, 2017 MOC Summit proceedings","year":2017,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Geology; Geography; Physical geography; Oceanography","score_opus":0.01020518121897918,"score_gpt":0.2128277905106247,"score_spread":0.20262260929164552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133047794","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2173975,0.014549019,0.0038875714,0.0006574877,0.024597475,0.0027126435,0.00086133543,0.001627283,0.7337097],"genre_scores_gemma":[0.52730644,0.01917425,0.011145144,0.0005209287,0.010432672,0.0011715038,0.0014376468,0.0011312222,0.42768016],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957932,0.000012286436,0.0011004589,0.0014049556,0.0007095977,0.0009794635],"domain_scores_gemma":[0.99744153,0.00001882187,0.0007313249,0.0004590888,0.0008973737,0.0004518881],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","insufficient_payload"],"category_scores_codex":[0.00028711755,0.0013303481,0.0013072824,0.00082438363,0.0010209153,0.0017209335,0.0007302576,0.0015470684,0.0037872954],"category_scores_gemma":[0.000042232932,0.001392736,0.00040166697,0.00024654777,0.00072794955,0.0018118815,0.00018809068,0.0015399215,0.0055179317],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009391272,0.000039276998,0.009310462,0.0019839474,0.000523858,0.0000075136195,0.00037351518,0.00005060473,0.0030997265,0.001672296,0.9381851,0.04465978],"study_design_scores_gemma":[0.001424065,0.00011652046,0.0019385277,0.0012401002,0.00045184893,0.000419683,0.0012168856,0.0045923986,0.005789752,0.0007333033,0.9798012,0.0022757081],"about_ca_topic_score_codex":0.00011178282,"about_ca_topic_score_gemma":0.0000401126,"teacher_disagreement_score":0.309909,"about_ca_system_score_codex":0.00034154544,"about_ca_system_score_gemma":0.00010515832,"threshold_uncertainty_score":0.99994475},"labels":[],"label_agreement":null},{"id":"W3134427693","doi":"10.1155/2021/8839362","title":"Procedural Modeling-Based BIM Approach for Railway Design","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Interoperability; Information model; Process (computing); Parametric statistics; Computer science; Systems engineering; Architecture; Software engineering; Engineering; Scheduling (production processes); Construction engineering; Parametric model; World Wide Web","score_opus":0.017264058187884075,"score_gpt":0.22784127549832284,"score_spread":0.21057721731043877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134427693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.054733116,0.00035179761,0.9443467,0.00005341652,0.00032787773,0.000109460234,0.0000063703847,0.00003480234,0.00003645039],"genre_scores_gemma":[0.72055775,0.00002676184,0.27924418,0.000025830845,0.00007291619,0.00001492419,0.000037986985,0.000013115196,0.0000065325726],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993703,0.000008762561,0.00034232612,0.000068502384,0.00012279203,0.0000873211],"domain_scores_gemma":[0.9994374,0.00002034062,0.00008023492,0.000046414483,0.00037646675,0.00003915436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007990297,0.00007806014,0.00012824588,0.00007098761,0.00003235441,0.000014604896,0.00003822187,0.000050913728,0.000007724912],"category_scores_gemma":[0.000013695245,0.00007632762,0.00010009826,0.00013058327,0.000007678983,0.00028427792,1.3136786e-7,0.000102882455,2.79089e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008612093,0.000018691097,0.00002036326,0.000077469296,0.00002092449,0.0000019105523,0.0001425485,0.97439873,0.014521476,0.0006000068,0.000029802593,0.010081964],"study_design_scores_gemma":[0.001587839,0.000097313634,0.00047285637,0.00005950647,0.000069489,0.000023881032,0.0006230374,0.9473263,0.047211323,0.0019817662,0.00040050715,0.000146194],"about_ca_topic_score_codex":1.8296332e-7,"about_ca_topic_score_gemma":0.0000034512766,"teacher_disagreement_score":0.66582465,"about_ca_system_score_codex":0.000033331467,"about_ca_system_score_gemma":0.00008697772,"threshold_uncertainty_score":0.311255},"labels":[],"label_agreement":null},{"id":"W3135984895","doi":"10.5555/1161734.3259863","title":"Session details: Construction engineering and project management: construction engineering II","year":2004,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Session (web analytics); Computer science; Project management; Construction engineering; Software engineering; Engineering management; Systems engineering; Engineering; World Wide Web","score_opus":0.012255600832211678,"score_gpt":0.21960053074658714,"score_spread":0.20734492991437548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135984895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32420307,0.000102376805,0.6717877,0.000039105515,0.0011777928,0.00031660398,0.000007188349,0.0007476115,0.0016185846],"genre_scores_gemma":[0.9773387,0.000049390554,0.022359014,0.000011870318,0.000108476626,0.000033258755,0.000019140407,0.000028998838,0.00005119375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900687,0.0000099769495,0.00033175017,0.00027111202,0.00016287352,0.00021744648],"domain_scores_gemma":[0.99959356,0.00002319823,0.000053840467,0.00016738701,0.00009723296,0.00006479159],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006361796,0.00024418972,0.00017278711,0.0003039867,0.000121111734,0.0001192927,0.000077269084,0.00013146631,0.000055795987],"category_scores_gemma":[0.000016420921,0.00026114995,0.0000462608,0.00024981058,0.00005359297,0.00059024565,0.000040359817,0.00020636841,0.000011959453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001739624,0.000011785921,0.00038266275,0.00018181784,0.000079133606,0.0000055458286,0.0005679639,0.8748295,0.005103184,0.044336934,0.000016451062,0.07446763],"study_design_scores_gemma":[0.0010192667,0.000047736154,0.0014333959,0.0003788895,0.0000473484,0.00016575269,0.0004143551,0.9865951,0.004137715,0.0009278893,0.0043893806,0.00044315774],"about_ca_topic_score_codex":0.000006354165,"about_ca_topic_score_gemma":0.0000044827098,"teacher_disagreement_score":0.6531356,"about_ca_system_score_codex":0.00011511924,"about_ca_system_score_gemma":0.000019567357,"threshold_uncertainty_score":0.9999841},"labels":[],"label_agreement":null},{"id":"W3136771914","doi":"10.1155/2021/8843277","title":"Development of a Semiautomatic Parametric Method for Creation of an I-BIM Model of a Tunnel for Use in FEM Software","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Javna Agencija za Raziskovalno Dejavnost RS","keywords":"Finite element method; Software; Parametric statistics; Process (computing); Quantum tunnelling; Parametric model; Engineering; Computer science; Structural engineering; Mechanical engineering; Physics","score_opus":0.0239057441577804,"score_gpt":0.28295582124422575,"score_spread":0.25905007708644534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136771914","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48636332,0.000046357913,0.51342195,0.0000019137813,0.000043927976,0.00009501832,0.000022079279,0.0000046022606,8.347821e-7],"genre_scores_gemma":[0.4707382,0.000015586926,0.52918994,0.0000011484753,0.000004323263,0.000012332751,0.00003021296,0.0000066335992,0.0000015928156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988774,0.000011408475,0.00084879337,0.00006272024,0.00013620488,0.000063439606],"domain_scores_gemma":[0.9988719,0.000134108,0.0003796155,0.00005635402,0.0005339519,0.000024077313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018088557,0.000071806484,0.0002595593,0.000254531,0.000011411444,0.0000035711998,0.000036807334,0.000058339792,0.0000019414922],"category_scores_gemma":[0.00008106648,0.00007238206,0.00008883959,0.00027598778,0.000008047909,0.0004038647,3.6531537e-7,0.00005433781,1.1649881e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012579805,0.000055103697,0.00026169675,0.00047082896,0.000040970404,2.714824e-7,0.0015438183,0.84310806,0.07268413,0.00042576328,6.5111675e-7,0.081282906],"study_design_scores_gemma":[0.0022528458,0.00014835337,0.021881275,0.00042030975,0.00012522243,0.000004787687,0.0016724105,0.5619829,0.40666088,0.0047067082,0.00002552424,0.00011877302],"about_ca_topic_score_codex":0.0000020370283,"about_ca_topic_score_gemma":0.0001285965,"teacher_disagreement_score":0.33397675,"about_ca_system_score_codex":0.000047171176,"about_ca_system_score_gemma":0.000120748715,"threshold_uncertainty_score":0.29516548},"labels":[],"label_agreement":null},{"id":"W3138039968","doi":"10.29173/mocs153","title":"Defined Variables for Modular Construction Multi Project Scheduling","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Scheduling (production processes); Schedule; Modular construction; Computer science; Engineering; Manufacturing engineering; Systems engineering; Operations research; Industrial engineering; Operations management; Operating system","score_opus":0.02627763193702548,"score_gpt":0.22907776078354458,"score_spread":0.2028001288465191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138039968","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6711537,0.0008697222,0.3216446,0.00011255179,0.0024193297,0.0010176883,0.000060631664,0.0009984704,0.0017232811],"genre_scores_gemma":[0.68356574,0.0001715356,0.31518275,0.000044551995,0.0004934666,0.00022280148,0.00007242935,0.00008190045,0.0001648306],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99810547,0.00001541328,0.0005621016,0.0005743329,0.00029107777,0.00045163097],"domain_scores_gemma":[0.9987377,0.000026556285,0.00015500262,0.00016137693,0.00070047705,0.00021887774],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035309923,0.00042264324,0.000419428,0.00042069666,0.00031242907,0.00030540986,0.0001366016,0.00036041322,0.000017437409],"category_scores_gemma":[0.00013445484,0.00044016875,0.00013234341,0.0004807246,0.0002824055,0.0009567851,0.000038205984,0.00030199747,0.000010432006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007159602,0.00019960165,0.10022415,0.002178795,0.0011374423,0.0000071008194,0.0029765505,0.016388198,0.10632192,0.320581,0.0047021676,0.4445671],"study_design_scores_gemma":[0.006822979,0.0003062427,0.0011251289,0.00032736853,0.0004097291,0.00082499627,0.010305843,0.8668288,0.036084976,0.012025523,0.06314115,0.0017972678],"about_ca_topic_score_codex":0.00004076109,"about_ca_topic_score_gemma":0.000015045367,"teacher_disagreement_score":0.8504406,"about_ca_system_score_codex":0.00016533905,"about_ca_system_score_gemma":0.00009465928,"threshold_uncertainty_score":0.99980503},"labels":[],"label_agreement":null},{"id":"W3138296130","doi":"10.29173/mocs50","title":"Near Optimum Selection of Module Configuration for Efficient Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Index (typography); Scheduling (production processes); Computer science; Selection (genetic algorithm); Reliability engineering; Engineering; Transport engineering; Systems engineering; Industrial engineering; Operations management","score_opus":0.011036560272583427,"score_gpt":0.20388319248715936,"score_spread":0.19284663221457593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138296130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83276445,0.00027888844,0.16317168,0.00007102331,0.0012904027,0.0006406212,0.000034166387,0.00037029918,0.0013784573],"genre_scores_gemma":[0.9629873,0.000055192446,0.036409196,0.000017089145,0.00025137002,0.000097670054,0.000054700333,0.000048278587,0.00007921106],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982546,0.00001626724,0.00061643275,0.00044331283,0.00034371307,0.00032570428],"domain_scores_gemma":[0.9984276,0.000018954031,0.00021764683,0.00012402792,0.0010132769,0.00019843718],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029820265,0.00033219228,0.00039312715,0.0003047293,0.00025554834,0.00018321568,0.0000982424,0.0003031047,0.000036978166],"category_scores_gemma":[0.000062552266,0.0003574671,0.00012509205,0.00046667157,0.00035951115,0.00056575006,0.000020360927,0.00022149192,0.000007672063],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008639182,0.00019654851,0.03553339,0.0014726275,0.00066172954,0.0000018527934,0.0025297443,0.23493654,0.2451295,0.1611111,0.0033386098,0.31422445],"study_design_scores_gemma":[0.0019847732,0.0002487407,0.0010749487,0.00009208441,0.00014621101,0.00018671797,0.0019145722,0.87452656,0.10695178,0.0023160402,0.010027122,0.0005304308],"about_ca_topic_score_codex":0.000025391466,"about_ca_topic_score_gemma":0.000006931493,"teacher_disagreement_score":0.63959,"about_ca_system_score_codex":0.00016375603,"about_ca_system_score_gemma":0.00007238806,"threshold_uncertainty_score":0.9998877},"labels":[],"label_agreement":null},{"id":"W3139789382","doi":"10.1109/wsc.2008.4736356","title":"Simulation of modular building construction","year":2008,"lang":"en","type":"article","venue":"2008 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"University of Alberta","keywords":"Modular design; Computer science; Process (computing); Modular construction; Quality (philosophy); Software; Construction management; Systems engineering; Engineering; Civil engineering; Operating system","score_opus":0.025515000818642976,"score_gpt":0.24314240046497587,"score_spread":0.2176273996463329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139789382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40781683,0.000038820504,0.58993423,0.000009362248,0.00040955938,0.00008583309,0.0000055768573,0.00015884137,0.0015409471],"genre_scores_gemma":[0.9952456,0.000016802154,0.0045296475,0.000012163103,0.00009369027,0.0000057731504,0.000013916727,0.000016735708,0.00006570004],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991255,0.000024806253,0.00037608927,0.00015764563,0.00018525477,0.00013071351],"domain_scores_gemma":[0.9993042,0.00008744501,0.00008469503,0.0001785109,0.0003000935,0.000045060147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004822643,0.000140621,0.00016625707,0.00016259683,0.00007602181,0.000016790456,0.000081793165,0.000107032356,0.00033138876],"category_scores_gemma":[0.000044236273,0.00015115966,0.00006429712,0.00019335326,0.00010880303,0.0003825043,0.000010835951,0.000116274445,0.000023280081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010605647,0.000007173679,0.0022571497,0.000015738666,0.000017772407,7.598755e-7,0.0002546905,0.9777221,0.00493404,0.0018945469,0.000023593571,0.012861819],"study_design_scores_gemma":[0.0002616667,0.000020160884,0.0035429178,0.000036310554,0.000009455237,0.000011799251,0.000046548583,0.98689705,0.0071917116,0.00073521625,0.0011015052,0.00014567527],"about_ca_topic_score_codex":0.0000068015197,"about_ca_topic_score_gemma":0.0000031208083,"teacher_disagreement_score":0.58742875,"about_ca_system_score_codex":0.00004464283,"about_ca_system_score_gemma":0.000026272957,"threshold_uncertainty_score":0.6164112},"labels":[],"label_agreement":null},{"id":"W3142666957","doi":"10.1109/wsc.2007.4419839","title":"Construction noise prediction and barrier optimization using special purpose simulation","year":2007,"lang":"en","type":"article","venue":"2007 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Noise barrier; Noise (video); Noise control; Plan (archaeology); Computer science; Simulation software; Software; Point (geometry); Noise pollution; Control (management); Simulation modeling; Roadway noise; Systems engineering; Simulation; Industrial engineering; Construction engineering; Transport engineering; Engineering; Noise reduction; Artificial intelligence","score_opus":0.01777994714528297,"score_gpt":0.24531387557983944,"score_spread":0.22753392843455647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142666957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14264049,0.000034699053,0.85061294,0.0000070258425,0.002016663,0.00024331882,0.00001927558,0.00025444222,0.0041711293],"genre_scores_gemma":[0.987453,0.000013828619,0.011066572,0.000028045086,0.0012845468,0.0000036249073,0.000050087736,0.000026204445,0.00007410344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880856,0.000029152277,0.0004712419,0.00025542892,0.0002183627,0.0002172562],"domain_scores_gemma":[0.9992462,0.00008395298,0.00009475542,0.00015099454,0.00031386482,0.00011026705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000202537,0.00020348321,0.0001534327,0.0002686617,0.00014847238,0.0001294618,0.00005505195,0.00020385845,0.00081218313],"category_scores_gemma":[0.00004984452,0.00022725957,0.00004362486,0.00021553622,0.00009819395,0.0007955988,0.000015575486,0.00017311136,0.000015133283],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004677731,0.0000068524087,0.004425976,0.000014216304,0.0000151186905,8.0955033e-7,0.000267908,0.9496052,0.00084318354,0.00073765405,0.000021575874,0.044014703],"study_design_scores_gemma":[0.0004473039,0.00002555583,0.003895573,0.000043169297,0.000030480032,0.000015189666,0.00020051259,0.99226254,0.0007345589,0.00031228122,0.0018281197,0.00020472724],"about_ca_topic_score_codex":0.0000059404583,"about_ca_topic_score_gemma":0.0000136516865,"teacher_disagreement_score":0.8448125,"about_ca_system_score_codex":0.00013809394,"about_ca_system_score_gemma":0.000027013397,"threshold_uncertainty_score":0.9267376},"labels":[],"label_agreement":null},{"id":"W3144893049","doi":"10.1109/wsc.2007.4419841","title":"Special purpose simulation template for workflow analysis in construction","year":2007,"lang":"en","type":"article","venue":"2007 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Workflow; Computer science; Software engineering; Crew; Process (computing); Software; Workflow technology; Component (thermodynamics); Systems engineering; Database; Programming language; Engineering","score_opus":0.022093894050951288,"score_gpt":0.2739410176458618,"score_spread":0.2518471235949105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144893049","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083743766,0.000019159002,0.9075236,0.000014951108,0.0017721754,0.00032954328,0.00001553459,0.00015517311,0.0064261183],"genre_scores_gemma":[0.99260515,0.000004551582,0.0059030764,0.00002601892,0.0011989919,0.000014318715,0.000076729564,0.000017023427,0.00015416708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987916,0.000019929508,0.00053547375,0.00023982563,0.00016067,0.00025251438],"domain_scores_gemma":[0.99922884,0.00022158616,0.000082808874,0.00016862234,0.00023343362,0.000064707274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027391984,0.00017467672,0.00022237866,0.0006192253,0.000061616534,0.00008291872,0.00008475873,0.00017104446,0.0007314567],"category_scores_gemma":[0.00004792043,0.00019342265,0.0001205115,0.000691472,0.000046926012,0.00036949172,0.000008267085,0.00014567122,0.000031084935],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008243764,0.0000100653715,0.011201221,0.000010369688,0.000058812726,8.579651e-7,0.00022030539,0.8534913,0.000093903654,0.00139582,0.00010195036,0.13333297],"study_design_scores_gemma":[0.0005498617,0.000020496864,0.021234946,0.000024397359,0.00006896537,0.0000012421707,0.00012318578,0.9635913,0.00036788132,0.0011051154,0.012700412,0.00021220563],"about_ca_topic_score_codex":0.000008407453,"about_ca_topic_score_gemma":0.0004282461,"teacher_disagreement_score":0.90886134,"about_ca_system_score_codex":0.00013483234,"about_ca_system_score_gemma":0.000019149265,"threshold_uncertainty_score":0.8008938},"labels":[],"label_agreement":null},{"id":"W3145116359","doi":"10.1109/wsc.2006.322989","title":"Sensitivity Analysis of Construction Simulation using Cell-Devs and Microcyclone","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Sensitivity (control systems); DEVS; Visualization; Resource (disambiguation); Discrete event simulation; Modeling and simulation; Space (punctuation); Distributed computing; Resource allocation; Simulation modeling; Data visualization; Industrial engineering; Data mining; Theoretical computer science; Simulation; Mathematics; Engineering; Computer network","score_opus":0.005729441481799581,"score_gpt":0.19863846316700792,"score_spread":0.19290902168520835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145116359","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.740804,0.000031775977,0.2575922,0.0000018136886,0.000052187446,0.000023750961,0.000004760193,0.00004826877,0.0014411953],"genre_scores_gemma":[0.9928426,0.0000038934127,0.007095644,0.0000020918276,0.000021730459,3.113402e-7,0.000009979669,0.0000039710353,0.000019753481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996803,0.000011235425,0.00014199631,0.000067051136,0.000049154056,0.000050270337],"domain_scores_gemma":[0.99983484,0.000026264333,0.000029704284,0.000051307296,0.000046531946,0.000011339663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000038553204,0.000054804113,0.000106160005,0.0001734223,0.000026421987,0.000011466785,0.000006357965,0.000047113954,0.000029769983],"category_scores_gemma":[0.0000016182698,0.00005549999,0.00003471968,0.00030009376,0.000033440276,0.00009225603,0.0000029306443,0.00003058829,5.595528e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001979941,0.0000033264441,0.013814457,0.000009225502,0.000044573935,1.6257177e-7,0.0000146365655,0.80715585,0.17492725,0.00055961474,0.0000044780977,0.003464442],"study_design_scores_gemma":[0.000080030186,0.000002031213,0.020180937,0.0000021425008,0.00018327846,0.0000042206216,0.0000657086,0.9266181,0.052708,0.00006571608,0.00003234162,0.00005750007],"about_ca_topic_score_codex":0.00036624822,"about_ca_topic_score_gemma":0.00019655474,"teacher_disagreement_score":0.25203857,"about_ca_system_score_codex":0.000020206962,"about_ca_system_score_gemma":0.000003196853,"threshold_uncertainty_score":0.22632238},"labels":[],"label_agreement":null},{"id":"W3145353663","doi":"10.1109/wsc48552.2020.9384073","title":"A Simulation-Based Decision-Support System for Reducing Duration, Cost, and Environmental Impacts of Earthmoving Operations","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Research and Development","keywords":"Scheduling (production processes); Operations research; Decision support system; Discrete event simulation; Duration (music); Control (management); Computer science; Engineering; Operations management; Simulation","score_opus":0.011057735725893783,"score_gpt":0.22147167057185313,"score_spread":0.21041393484595936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145353663","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22269683,0.00003099485,0.7765122,0.00006708539,0.00009086052,0.00029631157,0.000045850105,0.00009552281,0.00016434661],"genre_scores_gemma":[0.9874346,0.000002527112,0.012375535,0.00004400154,0.000050096824,0.000026259238,0.00004856291,0.000011591535,0.000006804403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994752,0.0000064984397,0.00026923983,0.000098959776,0.00007844294,0.00007165983],"domain_scores_gemma":[0.99967206,0.0001457035,0.000023093013,0.0000631186,0.000027075166,0.000068970825],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005102365,0.000073028736,0.00009360064,0.000039997612,0.00007293337,0.000032579752,0.00002504816,0.000040977568,0.0000835059],"category_scores_gemma":[0.000068536225,0.00006932402,0.00002986484,0.000060483686,0.000016214002,0.0001587861,0.000004301645,0.00003383782,0.000003890154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012268734,0.0000036082283,0.00054462143,0.00005869196,0.000010935885,1.5437757e-7,0.00021180001,0.9702606,0.01866034,0.0005318327,0.00006934373,0.009635783],"study_design_scores_gemma":[0.0003483906,0.000037721067,0.00035807744,0.00002459796,0.000011853709,0.0000015063337,0.0005068561,0.97897583,0.01938412,0.0000046754085,0.00027643406,0.000069945],"about_ca_topic_score_codex":0.0000069852154,"about_ca_topic_score_gemma":0.000010886026,"teacher_disagreement_score":0.7647378,"about_ca_system_score_codex":0.00003462555,"about_ca_system_score_gemma":0.000023680035,"threshold_uncertainty_score":0.28269514},"labels":[],"label_agreement":null},{"id":"W3145372498","doi":"10.1109/wsc.2008.4736349","title":"Distributed agent-based simulation of construction projects with HLA","year":2008,"lang":"en","type":"article","venue":"2008 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"High-level architecture; Interoperability; Schedule; Computer science; Reuse; Systems engineering; Process (computing); Resource (disambiguation); Distributed computing; Software engineering; Engineering; Computer network; Operating system","score_opus":0.028782903285659106,"score_gpt":0.23301223187130074,"score_spread":0.20422932858564163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145372498","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32917917,0.000015848413,0.6692421,0.00001667062,0.00020536495,0.00018841303,0.000030745945,0.00019926744,0.00092245504],"genre_scores_gemma":[0.99750036,0.0000043615523,0.0022321905,0.000015795662,0.000047615245,0.000014919215,0.00012597439,0.000018163135,0.0000406187],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907947,0.00003166866,0.0003357807,0.00018160051,0.00022526106,0.00014624684],"domain_scores_gemma":[0.9991583,0.00007699002,0.0001112772,0.0001935753,0.0004088572,0.000050982857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000038816113,0.00017087377,0.00017932866,0.0001485195,0.000078552446,0.000021557718,0.00007488056,0.00010078506,0.00021599302],"category_scores_gemma":[0.00002552554,0.0001570509,0.000049256352,0.00028775228,0.00015152486,0.0002856383,0.0000061799497,0.000118669006,0.000016221313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063701445,0.00001810011,0.0089220265,0.00003004667,0.000023957724,0.0000018728658,0.00020561513,0.98452425,0.0006482224,0.0002981147,0.00005552429,0.005208548],"study_design_scores_gemma":[0.00067710254,0.00007170652,0.007994109,0.00006786172,0.000017766924,0.000012902448,0.000083477535,0.98395854,0.006058203,0.000053982385,0.00082523405,0.00017911309],"about_ca_topic_score_codex":0.000009775809,"about_ca_topic_score_gemma":0.000016254127,"teacher_disagreement_score":0.6683212,"about_ca_system_score_codex":0.000059843336,"about_ca_system_score_gemma":0.000080422746,"threshold_uncertainty_score":0.640435},"labels":[],"label_agreement":null},{"id":"W3145698671","doi":"","title":"A Quarter Century of Work to Revolutionize Architecture, Engineering and Construction Enterprise Information Systems","year":2017,"lang":"en","type":"article","venue":"土木工程与建筑：英文版","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architecture; Work (physics); Engineering; Engineering management; Computer science; Architectural engineering; Construction engineering; Geography; Mechanical engineering","score_opus":0.0028663609175127273,"score_gpt":0.16738457735145115,"score_spread":0.16451821643393844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145698671","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87957996,0.000463389,0.11277073,0.00010755268,0.0031045948,0.00039160048,0.000031214695,0.0002472479,0.0033037283],"genre_scores_gemma":[0.9967247,0.000047747988,0.0030445943,0.000009408621,0.00011121768,0.000029722894,0.000007922989,0.000009727646,0.000014910298],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993828,0.000008820932,0.00027024437,0.00008654826,0.00011668137,0.00013490541],"domain_scores_gemma":[0.9995104,0.000013646179,0.00008344928,0.00025689398,0.00006468416,0.000070924565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007009177,0.000119135606,0.00014446017,0.00015246087,0.00009801719,0.00013288164,0.0000928138,0.000083253275,0.000008569524],"category_scores_gemma":[0.000040552844,0.0001189194,0.000034821245,0.000076465214,0.000038897797,0.0004119814,0.000021050755,0.000118901065,0.000018372142],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032566115,0.000049856288,0.06692486,0.0023933176,0.00048431294,0.0000052739347,0.021347838,0.13997744,0.015284831,0.06948473,0.008387768,0.6753341],"study_design_scores_gemma":[0.0051434943,0.0004572756,0.36382344,0.0043820743,0.0002994388,0.00083950773,0.011154066,0.20458621,0.011891602,0.0007634424,0.39361593,0.00304351],"about_ca_topic_score_codex":0.00007117163,"about_ca_topic_score_gemma":0.000009349629,"teacher_disagreement_score":0.67229056,"about_ca_system_score_codex":0.000045308596,"about_ca_system_score_gemma":0.000008683139,"threshold_uncertainty_score":0.48493922},"labels":[],"label_agreement":null},{"id":"W3148011496","doi":"10.1108/ci-03-2020-0039","title":"Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Workflow; Process (computing); Computer science; Process management; Systems engineering; Dissemination; Materials management; Engineering management; Engineering; Operations management; Database","score_opus":0.013551025085248835,"score_gpt":0.2246535651735792,"score_spread":0.21110254008833038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148011496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0731599,0.000024334067,0.92104846,0.0010407873,0.0031334334,0.000696529,0.00007171741,0.00017129695,0.0006535123],"genre_scores_gemma":[0.90896237,0.000019857971,0.08903002,0.00021425307,0.0003874724,0.0007037903,0.00034415617,0.000040257586,0.00029784782],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99907404,0.000013632352,0.0004321811,0.00018518226,0.00015655998,0.00013841438],"domain_scores_gemma":[0.99862885,0.00003986697,0.000099121615,0.00018873862,0.0010213729,0.000022018105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018016926,0.0001280261,0.0001346478,0.00032505527,0.00010127364,0.00009086363,0.000066673885,0.000071495255,0.000053269505],"category_scores_gemma":[0.00014947486,0.00012399665,0.000021787671,0.0016193426,0.000023744995,0.00023114508,0.0000216911,0.000039555292,0.000006193144],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002001936,0.0000076081883,0.00003196474,0.00016400623,0.00007177675,1.8559338e-7,0.00020131604,0.012521147,0.40399876,0.15018632,0.0006731389,0.43212378],"study_design_scores_gemma":[0.00056155794,0.000052252093,0.00043594438,0.00011498742,0.000051127183,0.000016668018,0.0017582821,0.02376266,0.9597241,0.0025316637,0.010728558,0.0002621808],"about_ca_topic_score_codex":0.0000024165313,"about_ca_topic_score_gemma":0.0000074834975,"teacher_disagreement_score":0.83580244,"about_ca_system_score_codex":0.00008567169,"about_ca_system_score_gemma":0.000019650257,"threshold_uncertainty_score":0.50564367},"labels":[],"label_agreement":null},{"id":"W3148219949","doi":"10.1109/wsc.2009.5429307","title":"An overview of the COSYE environment for construction simulation","year":2009,"lang":"en","type":"article","venue":"Proceedings of the 2009 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; Discrete event simulation; Architecture; Systems engineering; High-level architecture; Process (computing); Event (particle physics); Software engineering; Construction management; Simulation; Engineering; Civil engineering; Interoperability","score_opus":0.037698618953365785,"score_gpt":0.27077258136018756,"score_spread":0.23307396240682177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148219949","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8718471,0.00019252165,0.12290169,0.000482426,0.0008873825,0.0013537043,0.000057868783,0.00015109808,0.0021262201],"genre_scores_gemma":[0.9985425,0.00002090861,0.001231873,0.00005067987,0.00007489065,0.000011163085,0.0000040271757,0.0000112618445,0.00005268638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990816,0.000009306383,0.00040810637,0.00015717374,0.00021977347,0.00012402731],"domain_scores_gemma":[0.9992372,0.000038993956,0.00024456464,0.0001570413,0.00029191098,0.000030330162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012112219,0.00014860938,0.00017162866,0.000060891078,0.000084901825,0.000040246312,0.0002502453,0.000100962185,0.00007112938],"category_scores_gemma":[0.000041114345,0.00010503508,0.000111130925,0.0001223324,0.00008799447,0.00040600644,0.000015563111,0.00010541934,0.0000018052108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000064551794,0.000052880947,0.0030133037,0.00012473861,0.000033977267,7.1303554e-9,0.00071241095,0.8010307,0.06191397,0.019738736,0.00010820315,0.11320654],"study_design_scores_gemma":[0.0004082497,0.0001099228,0.019652938,0.00016324814,0.000055846052,0.0000018578427,0.00019476254,0.9047042,0.06216519,0.010087033,0.0023031074,0.00015364717],"about_ca_topic_score_codex":0.0000025728193,"about_ca_topic_score_gemma":0.0000023235239,"teacher_disagreement_score":0.12669542,"about_ca_system_score_codex":0.00005491966,"about_ca_system_score_gemma":0.000016126576,"threshold_uncertainty_score":0.42832062},"labels":[],"label_agreement":null},{"id":"W3148677849","doi":"10.1109/wsc.2011.6148052","title":"Loosely coupled visualization of industrial construction simulation using a gaming engine","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Computer science; Pipeline (software); Interactive simulation; Window (computing); Distributed Interactive Simulation; Virtual reality; Human–computer interaction; Distributed computing; Simulation; Operating system; Artificial intelligence","score_opus":0.05648870252293158,"score_gpt":0.250925514789634,"score_spread":0.1944368122667024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148677849","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5102761,0.000016250973,0.4874158,5.056476e-7,0.00047623625,0.00008231448,0.0000013007572,0.00014929468,0.0015822161],"genre_scores_gemma":[0.99307555,0.000004813281,0.0067881416,0.0000028372197,0.00009401713,0.0000025393545,0.00000807203,0.00001456646,0.000009449751],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994269,0.000014217946,0.000285368,0.000082853425,0.00010300296,0.00008766523],"domain_scores_gemma":[0.9997108,0.000017866676,0.00006244447,0.000076827,0.0001052811,0.00002680705],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006964945,0.0000894635,0.000109429515,0.00015314967,0.000031023086,0.000009607445,0.00003148919,0.00012089186,0.00037365872],"category_scores_gemma":[0.00002221461,0.000092092945,0.000032054493,0.00025279238,0.000034126388,0.00024219009,0.0000047542267,0.000062656436,0.0000037020916],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088235596,0.000049856208,0.018551944,0.000067972695,0.00012447785,9.161564e-7,0.0011911481,0.7468734,0.061635073,0.03577501,0.000026943122,0.13561507],"study_design_scores_gemma":[0.00035924197,0.000020293555,0.00034368035,0.00002573512,0.000024631865,0.0000070244737,0.00017436009,0.96245515,0.036183797,0.0002652246,0.00004267507,0.000098196426],"about_ca_topic_score_codex":0.000051321804,"about_ca_topic_score_gemma":0.000006603038,"teacher_disagreement_score":0.48279947,"about_ca_system_score_codex":0.000043571774,"about_ca_system_score_gemma":0.000018118888,"threshold_uncertainty_score":0.4091301},"labels":[],"label_agreement":null},{"id":"W3148877989","doi":"10.1109/wsc.2011.6148036","title":"Defining background tasks in SimFC","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Process (computing); Simplicity; Resource (disambiguation); Industrial engineering; Simulation modeling; Construction management; Simulation; Systems engineering; Engineering; Civil engineering","score_opus":0.021860961115652784,"score_gpt":0.20787554132672473,"score_spread":0.18601458021107195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148877989","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35837334,0.00009922344,0.011259107,0.0000050488484,0.0003056926,0.000023772587,5.131365e-7,0.0001774224,0.62975585],"genre_scores_gemma":[0.996678,0.0000059039508,0.0030675551,0.000021749913,0.000010893046,0.0000045915917,0.0000011847537,0.000005157712,0.00020495208],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.999797,0.0000028556558,0.00007232543,0.0000400967,0.000024200495,0.000063510684],"domain_scores_gemma":[0.99992424,0.0000049606083,0.000003573661,0.000047816993,0.0000058495966,0.000013563651],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00002360241,0.000036154015,0.000034075176,0.000040833143,0.000007779882,0.0000067681417,0.000025074709,0.00003180471,0.0010126869],"category_scores_gemma":[0.0000014428091,0.000033472526,0.000010053583,0.00006535532,0.0000072886605,0.000080158046,0.0000028801699,0.00005337667,0.00018345396],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009541346,0.000016838401,0.035481602,0.000019050545,0.000016816832,0.000003924475,0.0011719891,0.00037305275,0.0009360753,0.8160425,0.0021641594,0.14376448],"study_design_scores_gemma":[0.003336455,0.00025014722,0.5216989,0.00019156518,0.000041171807,0.0001710949,0.014906075,0.21680972,0.09994147,0.06646626,0.073937416,0.0022497461],"about_ca_topic_score_codex":0.00006941869,"about_ca_topic_score_gemma":0.00022046945,"teacher_disagreement_score":0.7495762,"about_ca_system_score_codex":0.000013989885,"about_ca_system_score_gemma":0.0000030255594,"threshold_uncertainty_score":0.9999005},"labels":[],"label_agreement":null},{"id":"W3148923809","doi":"10.1109/wsc.2011.6148048","title":"Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Computer science; Task (project management); Simulation modeling; Productivity; Data mining; Real-time computing; Systems engineering; Engineering","score_opus":0.027703407505942607,"score_gpt":0.23624791773201415,"score_spread":0.20854451022607154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148923809","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6766481,0.000023991748,0.31494376,0.000010157974,0.0003940948,0.00044511957,0.000022566925,0.00025956376,0.007252665],"genre_scores_gemma":[0.9679987,0.000011757029,0.031819295,0.0000014420947,0.000057740686,0.000018250708,0.00002185434,0.000015215334,0.000055749893],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928796,0.000022346905,0.00030081536,0.00016616755,0.00009797587,0.0001247473],"domain_scores_gemma":[0.999617,0.000032386753,0.000102523954,0.00011670683,0.00010134361,0.000030029056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019411545,0.00011732374,0.00016009955,0.00010270389,0.00008525254,0.000015329068,0.000026156531,0.00008137944,0.000068536574],"category_scores_gemma":[0.000044754324,0.00012084322,0.00003404532,0.00007729021,0.00010052596,0.0005718596,0.0000132735995,0.00005250586,6.9062116e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011702768,0.000078961886,0.019862855,0.0011480546,0.00022276488,6.061082e-7,0.0032687588,0.033769052,0.22188458,0.035752036,0.000081011196,0.6827611],"study_design_scores_gemma":[0.00088122283,0.00016580726,0.010557052,0.000055765933,0.000067203575,0.000016029438,0.0007396819,0.7808263,0.20243146,0.0036157244,0.00029949986,0.0003442598],"about_ca_topic_score_codex":0.0002545801,"about_ca_topic_score_gemma":0.00009781554,"teacher_disagreement_score":0.74705726,"about_ca_system_score_codex":0.00007190668,"about_ca_system_score_gemma":0.000029180359,"threshold_uncertainty_score":0.49278435},"labels":[],"label_agreement":null},{"id":"W3153916170","doi":"10.1016/j.autcon.2021.103700","title":"A computational methodology for generating modular design options for building extensions","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Modular design; Computer science; Efficient energy use; Demolition; Architectural engineering; Systems engineering; Building design; Pareto principle; Axiomatic design; Risk analysis (engineering); Engineering; Civil engineering; Manufacturing engineering; Operations management","score_opus":0.06617196106758301,"score_gpt":0.30674792226728026,"score_spread":0.24057596119969726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153916170","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05657049,0.00016332784,0.9408837,0.0001876382,0.0013791515,0.00044591384,0.000028163779,0.00029413975,0.00004747418],"genre_scores_gemma":[0.18861105,0.000013718446,0.81061757,0.00003853591,0.00013379817,0.00042659653,0.00012579694,0.000018958204,0.000013983926],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989773,0.00012001285,0.00042170013,0.00022131907,0.00008886897,0.00017078771],"domain_scores_gemma":[0.99886817,0.0005706809,0.00007172852,0.00010644303,0.0003495056,0.000033467502],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037326312,0.00012203143,0.00017236863,0.00021616518,0.00020263583,0.00005846009,0.000041201245,0.00013780351,0.000033735814],"category_scores_gemma":[0.00029536724,0.00014812042,0.00007989393,0.00029287522,0.000042865708,0.00025837662,0.0000071491427,0.00009155095,0.000002356765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005961679,0.0000069877583,0.000042334585,0.000032317195,0.000022663642,3.358941e-7,0.00008084604,0.76585215,0.044599213,0.12708515,0.0001703532,0.06210166],"study_design_scores_gemma":[0.00056397106,0.000016392756,0.0003287361,0.000030535346,0.000022599137,0.00013746055,0.00027788233,0.91843116,0.015958995,0.06358675,0.00050648086,0.00013902989],"about_ca_topic_score_codex":0.0000031721927,"about_ca_topic_score_gemma":0.000011210464,"teacher_disagreement_score":0.15257898,"about_ca_system_score_codex":0.00012163995,"about_ca_system_score_gemma":0.000090559704,"threshold_uncertainty_score":0.60401756},"labels":[],"label_agreement":null},{"id":"W3153970484","doi":"10.1007/978-3-030-70566-4_65","title":"Industry 4.0 and BIM: Do They Share the Same Objectives?","year":2021,"lang":"en","type":"book-chapter","venue":"Lecture notes in mechanical engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Software deployment; Emerging technologies; Business; Engineering; Digital transformation; Architectural engineering; Computer science; World Wide Web","score_opus":0.008419968299929324,"score_gpt":0.19762310569134733,"score_spread":0.189203137391418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153970484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010001912,0.058289945,0.7941643,0.002463785,0.012022784,0.0026102322,0.00041500008,0.0035406416,0.116491385],"genre_scores_gemma":[0.9942204,0.000753581,0.0024251721,0.00023100842,0.00095643196,0.000062205225,0.000049124166,0.00023195753,0.0010701448],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99893826,0.0000111401805,0.00029584102,0.00032229736,0.00018991136,0.00024252509],"domain_scores_gemma":[0.99931127,0.00023443149,0.00003773176,0.00030408296,0.00004136536,0.000071139715],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.00010463762,0.00039698317,0.00035146938,0.00013797669,0.000042405674,0.000092099006,0.00016638251,0.0016467556,0.0003019906],"category_scores_gemma":[0.00015993424,0.00031884847,0.00010083887,0.000081882536,0.000024840332,0.000062549254,0.00006934173,0.0035961138,0.000007569948],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011611554,0.000007767164,0.000013517558,0.00035326078,0.0002919816,0.000068446636,0.00039234382,0.22500452,0.0053618667,0.6232368,0.00005165106,0.14520623],"study_design_scores_gemma":[0.0018229504,0.00021663646,0.00031738012,0.007194484,0.0004770276,0.0012046084,0.00016765525,0.41739148,0.028532466,0.45428222,0.0830153,0.0053777746],"about_ca_topic_score_codex":0.0000073404817,"about_ca_topic_score_gemma":0.00007537652,"teacher_disagreement_score":0.9842185,"about_ca_system_score_codex":0.00012483312,"about_ca_system_score_gemma":0.000025964226,"threshold_uncertainty_score":0.9999264},"labels":[],"label_agreement":null},{"id":"W3154051909","doi":"10.1108/ci-11-2019-0118","title":"Construction productivity assessment on Brock Commons Tallwood House","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Schedule; Productivity; Prefabrication; Originality; Engineering; Integrated project delivery; Architectural engineering; Process (computing); Project management; Construction management; Construction engineering; Civil engineering; Computer science; Systems engineering; Qualitative research","score_opus":0.01418041334257206,"score_gpt":0.23688407603316036,"score_spread":0.2227036626905883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154051909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8378521,0.000055618748,0.11900812,0.00048280726,0.007170495,0.00033651796,0.00003748221,0.0018493023,0.033207566],"genre_scores_gemma":[0.9837976,0.00002832644,0.015075605,0.00009552989,0.00047580403,0.00007947122,0.0001424095,0.000057975027,0.00024729205],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99836487,0.00007839545,0.00058262167,0.00039523633,0.00033496297,0.00024392974],"domain_scores_gemma":[0.9987756,0.000038465696,0.00015572323,0.0004159227,0.0005629234,0.000051374165],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011381391,0.000261431,0.0002338796,0.0004187955,0.00026083481,0.00014467185,0.00008228568,0.00020463763,0.00028617601],"category_scores_gemma":[0.00006947679,0.00029847948,0.00006622624,0.0018254791,0.00018516542,0.0005312138,0.00002226684,0.000486783,0.000059396345],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023951065,0.000095072355,0.013216102,0.00008082357,0.00012953085,0.000005442,0.000058572616,0.0033483182,0.119038224,0.49753082,0.0058308123,0.36064234],"study_design_scores_gemma":[0.0042325654,0.00033898343,0.066418454,0.0003658865,0.0002063403,0.0038128528,0.0038997706,0.01330282,0.7064704,0.04881176,0.14959867,0.0025415155],"about_ca_topic_score_codex":0.0000038746502,"about_ca_topic_score_gemma":0.000027239761,"teacher_disagreement_score":0.58743215,"about_ca_system_score_codex":0.00029776664,"about_ca_system_score_gemma":0.00016069616,"threshold_uncertainty_score":0.9999467},"labels":[],"label_agreement":null},{"id":"W3154708143","doi":"10.29173/mocs150","title":"Learning from Previous BIM-Based Modular Construction Cases: Qualitative Comparative Analysis Approach","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Modular construction; Computer science; Building information modeling; Causality (physics); Risk analysis (engineering); Management science; Process management; Engineering; Operations management; Business","score_opus":0.035834368538964316,"score_gpt":0.25765509462239666,"score_spread":0.22182072608343234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154708143","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82528114,0.00085264415,0.16941704,0.000038364575,0.00048351206,0.00038747318,0.000054754237,0.000593642,0.0028914597],"genre_scores_gemma":[0.95785576,0.000068592584,0.04135495,0.000028390745,0.00020845525,0.00009132316,0.00029619815,0.00003732349,0.00005902247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975961,0.000114389666,0.0006758294,0.0007266215,0.0004967748,0.0003902903],"domain_scores_gemma":[0.99842405,0.00007859704,0.0002726307,0.00018751534,0.00071082957,0.00032634984],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039656996,0.00050736195,0.0007618243,0.00072201405,0.00033541396,0.00032987315,0.00014896177,0.00032469784,0.000064867694],"category_scores_gemma":[0.00008258327,0.00052332715,0.00023239304,0.0013800586,0.00053458463,0.0008549187,0.00003602541,0.00057221955,0.000019915902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012100624,0.00040206464,0.28762674,0.00094774406,0.010475327,0.00004040012,0.07114845,0.38551226,0.016281381,0.088107914,0.0021276388,0.13612002],"study_design_scores_gemma":[0.002501741,0.00027780037,0.0023601735,0.00010372536,0.0015954031,0.00015304142,0.10803466,0.86768705,0.007501949,0.0032805107,0.0052340846,0.001269854],"about_ca_topic_score_codex":0.00022311788,"about_ca_topic_score_gemma":0.000039828763,"teacher_disagreement_score":0.48217478,"about_ca_system_score_codex":0.00022909357,"about_ca_system_score_gemma":0.000066126566,"threshold_uncertainty_score":0.9997218},"labels":[],"label_agreement":null},{"id":"W3155372619","doi":"10.32722/cmj.v3i1.3506","title":"PERBANDINGAN METODE KONVENSIONAL DENGAN BIM TERHADAP EFISIENSI BIAYA, MUTU, WAKTU","year":2021,"lang":"id","type":"article","venue":"Construction and Material Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.009545628354322693,"score_gpt":0.2043541926168292,"score_spread":0.1948085642625065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155372619","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9553682,0.0013221862,0.0057634325,0.0007670479,0.033289064,0.00012567164,0.00006494791,0.000152001,0.0031474396],"genre_scores_gemma":[0.9817463,0.00275298,0.010475064,0.00023163516,0.0035268562,0.000005950185,0.00006471564,0.00007453668,0.0011219251],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9978269,0.00021140293,0.00076478993,0.0003845611,0.0003633007,0.00044908092],"domain_scores_gemma":[0.9987245,0.00003955264,0.0002284751,0.00019812983,0.00041872985,0.00039060382],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00026531675,0.0003998098,0.00046457644,0.00025695996,0.00071877544,0.0010025809,0.00010303541,0.00036572953,0.0031002113],"category_scores_gemma":[0.00007007792,0.00039797777,0.00019036069,0.00024532378,0.00030605058,0.00050300715,0.00007093034,0.00069943885,0.00005563813],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032979285,0.00010141752,0.0047293333,0.00034499884,0.0007553619,0.0006213329,0.0008489616,0.00013625494,0.7507468,0.07558309,0.004988749,0.16081394],"study_design_scores_gemma":[0.005762395,0.000345476,0.017658843,0.0012480904,0.0008981122,0.15640949,0.010705897,0.0022052303,0.5846151,0.008199057,0.2097745,0.0021778205],"about_ca_topic_score_codex":0.000015026419,"about_ca_topic_score_gemma":0.000019906784,"teacher_disagreement_score":0.20478573,"about_ca_system_score_codex":0.00016088947,"about_ca_system_score_gemma":0.0002735361,"threshold_uncertainty_score":0.99984723},"labels":[],"label_agreement":null},{"id":"W3155731923","doi":"","title":"THE INCLUSION OF INDIVIDUALS WITH COLOUR VISION DEFICIENCIES","year":2016,"lang":"en","type":"article","venue":"TSpace (University of Toronto)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Inclusion (mineral); Artificial intelligence; Computer science; Psychology; Social psychology","score_opus":0.00529960363153216,"score_gpt":0.19050368911441531,"score_spread":0.18520408548288314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155731923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9629902,0.00039568965,0.011217893,0.00051359495,0.00008377816,0.000070942704,0.000006800014,0.000050912276,0.02467019],"genre_scores_gemma":[0.9984972,0.00022726541,0.00069450244,0.0000014394725,0.00000459379,7.9361925e-8,3.5662458e-7,0.0000029004477,0.0005716482],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9997007,0.000012879305,0.000039873645,0.0000504911,0.0001295323,0.000066507884],"domain_scores_gemma":[0.9997377,0.000041258867,0.000043376564,0.00010165601,0.000057064724,0.00001894374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000076822056,0.000044039265,0.00006631828,0.000013756426,0.0001774293,0.0000030318677,0.00012034697,0.000035545523,0.000587009],"category_scores_gemma":[0.000004493237,0.00002742918,0.000022866025,0.000035017987,0.0001254505,0.0002043673,0.00007145065,0.000020869418,0.0000029033865],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016533486,0.00004148393,0.008942989,0.00005265424,0.00011290148,0.0000017043341,0.019888058,0.0004053798,0.09672134,0.022808269,0.0021855903,0.8486743],"study_design_scores_gemma":[0.0023736567,0.00085391296,0.8811135,0.00037649935,0.00010700471,0.0000137612005,0.051576734,0.0031205323,0.021823963,0.00048982626,0.037716024,0.0004345631],"about_ca_topic_score_codex":0.0021735153,"about_ca_topic_score_gemma":0.011063533,"teacher_disagreement_score":0.8721705,"about_ca_system_score_codex":0.00007217578,"about_ca_system_score_gemma":0.000015778824,"threshold_uncertainty_score":0.6427337},"labels":[],"label_agreement":null},{"id":"W3156968881","doi":"10.1139/cjce-2020-0762","title":"Digitalization Opportunities Road Mapping Tool (DORMT©): A framework to assess digitalization opportunities in construction organizations","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"","keywords":"Judgement; Process management; Rank (graph theory); Knowledge management; Computer science; Engineering management; Engineering","score_opus":0.031433220750274805,"score_gpt":0.20319197925005075,"score_spread":0.17175875849977595,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156968881","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1002847,0.0007283417,0.8913721,0.0003193007,0.0023288038,0.00011928222,0.000046325105,0.00011292089,0.004688236],"genre_scores_gemma":[0.996682,0.00015784515,0.0026648298,0.00007670677,0.00021184748,0.0000075031394,0.000057774545,0.00004973172,0.00009178602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988157,0.000020348078,0.00059875794,0.00011262006,0.00018162906,0.0002709482],"domain_scores_gemma":[0.9987561,0.000039388775,0.00008663565,0.00013960977,0.00064763357,0.00033061192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012331652,0.00018336535,0.00023655001,0.0009319925,0.00007540967,0.0003652798,0.00011376104,0.00013937513,0.00024437218],"category_scores_gemma":[0.00043134618,0.00022651623,0.000053180403,0.0010062328,0.000028198216,0.0010422613,0.000008973255,0.00022960687,0.0000030407286],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000030392894,0.000011979713,0.008627718,0.00018787115,0.00012091791,0.0003214117,0.0025995777,0.8818565,0.0010808208,0.064553015,0.0013816811,0.039255444],"study_design_scores_gemma":[0.003065161,0.0003141929,0.070167534,0.012051793,0.00034769537,0.010763283,0.058195855,0.48594972,0.017094407,0.015706172,0.32028937,0.0060547963],"about_ca_topic_score_codex":0.000063734275,"about_ca_topic_score_gemma":0.006823335,"teacher_disagreement_score":0.8963973,"about_ca_system_score_codex":0.00037704277,"about_ca_system_score_gemma":0.0008038532,"threshold_uncertainty_score":0.9237064},"labels":[],"label_agreement":null},{"id":"W3158234369","doi":"10.19255/jmpm02511","title":"Exploring the Influence of Risks in BIM Implementation: A Review Exploring BIM Critical Success Factors and BIM Implementation Phases","year":2021,"lang":"en","type":"review","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Building information modeling; Interoperability; Risk analysis (engineering); Process management; Risk management; Computer science; Interface (matter); Knowledge management; Business; Engineering; Operations management","score_opus":0.18653038775283998,"score_gpt":0.41543041067447434,"score_spread":0.22890002292163436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158234369","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0819355,0.9161737,0.00022775003,0.00009664166,0.0005841252,0.0007865438,0.00009228617,0.000081782884,0.000021690807],"genre_scores_gemma":[0.045159977,0.95340043,0.00012373306,0.000019821853,0.00011098017,0.0010156177,0.00011582575,0.00005167235,0.0000019229956],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99766207,0.00022865714,0.0010335364,0.00039472428,0.00034047742,0.00034051467],"domain_scores_gemma":[0.9986734,0.0005235692,0.0002186957,0.00035900896,0.0001356488,0.00008966842],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003783912,0.00046230658,0.001075033,0.00033963204,0.0001174794,0.00011751093,0.0002188322,0.00009153697,0.0002636248],"category_scores_gemma":[0.00017148608,0.00035574866,0.00021885402,0.0009813764,0.00008950184,0.0009824377,0.00007851602,0.00044399907,0.000005335568],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017153654,0.000013445791,0.0016131914,0.019356508,0.00012306884,0.000007759492,0.00075178355,0.000073708856,0.000010037013,0.005233196,0.00006514942,0.9727504],"study_design_scores_gemma":[0.00110016,0.00015056417,0.008237771,0.11459106,0.0022343695,0.00015679914,0.023280198,0.000053859574,0.0014055106,0.00018101907,0.8465093,0.0020994279],"about_ca_topic_score_codex":0.0004342144,"about_ca_topic_score_gemma":0.00060736685,"teacher_disagreement_score":0.97065103,"about_ca_system_score_codex":0.00016103066,"about_ca_system_score_gemma":0.000121848614,"threshold_uncertainty_score":0.99988943},"labels":[],"label_agreement":null},{"id":"W3158653109","doi":"10.1155/2021/5554551","title":"Design for Manufacturing and Assembly: A BIM‐Enabled Generative Framework for Building Panelization Design","year":2021,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Generative grammar; Generative Design; Manufacturing engineering; Engineering drawing; Architectural engineering; Construction engineering; Computer science; Design elements and principles; Engineering; Software engineering; Operations management; Artificial intelligence","score_opus":0.016603959134953,"score_gpt":0.24767472843085442,"score_spread":0.23107076929590142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158653109","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044138567,0.004511747,0.98971623,0.000021774107,0.0006906053,0.00041582185,0.000005029945,0.00019463517,0.000030285086],"genre_scores_gemma":[0.4016031,0.0007787528,0.59704906,0.000013563802,0.00013377663,0.0003660741,0.000007749043,0.000040049617,0.000007866761],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991952,0.000016357586,0.00022971051,0.00023147067,0.00007071692,0.0002565128],"domain_scores_gemma":[0.99922454,0.00054517045,0.000030464034,0.000102996106,0.000055525685,0.000041309522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016203565,0.00017902929,0.00019448652,0.00012336006,0.00006684276,0.0000660074,0.000054317366,0.00011312529,0.000006053738],"category_scores_gemma":[0.00017145723,0.00020140606,0.00003467922,0.00016598386,0.000009312964,0.00043910774,0.000010759908,0.00012552242,3.142695e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011391651,0.0000039938336,0.000011742638,0.00017925735,0.000019385157,0.000001540813,0.00012928499,0.9456717,0.01893958,0.01646081,0.000010562154,0.018560775],"study_design_scores_gemma":[0.00028266126,0.000021859998,0.0000207935,0.00016060895,0.000012030856,0.000009590178,0.00006979251,0.669201,0.31450108,0.014009737,0.0015170892,0.00019373964],"about_ca_topic_score_codex":5.094381e-7,"about_ca_topic_score_gemma":0.000013092597,"teacher_disagreement_score":0.39718926,"about_ca_system_score_codex":0.00008843394,"about_ca_system_score_gemma":0.000018728686,"threshold_uncertainty_score":0.8213101},"labels":[],"label_agreement":null},{"id":"W3160008510","doi":"10.1108/ecam-11-2020-0986","title":"A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Context (archaeology); Lean construction; Procurement; Systems engineering; Engineering; Process management; Computer science; Modular design; Bidding; Construction engineering; Construction industry; Operations management; Business","score_opus":0.006971102520801377,"score_gpt":0.20443454892908347,"score_spread":0.1974634464082821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160008510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44194072,0.00014790946,0.5552277,0.000046190766,0.001323664,0.00032617216,0.000020821008,0.00028085467,0.0006859941],"genre_scores_gemma":[0.8158706,0.000042018662,0.18379681,0.0000074038103,0.000109125336,0.000080246646,0.00004364512,0.00002802028,0.00002214377],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99879754,0.000012343771,0.00048747522,0.00026852803,0.00017803734,0.000256083],"domain_scores_gemma":[0.9994928,0.00008967847,0.000077222634,0.00022227032,0.00006472838,0.00005325647],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00007682718,0.00022892284,0.00024940638,0.000424669,0.00004749441,0.00005246991,0.000086751556,0.00009173252,0.00005144293],"category_scores_gemma":[0.00004680368,0.00025682172,0.000120029385,0.00041988192,0.00006458787,0.00021067081,0.000028146178,0.0001942321,0.0000019862234],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038938695,0.000021550053,0.00083928497,0.000698712,0.00018510285,0.0000068167265,0.00030158277,0.37149975,0.0039162966,0.19196793,0.000013753769,0.43051028],"study_design_scores_gemma":[0.0063303676,0.00026000384,0.027503597,0.0032413646,0.0004047321,0.0015086447,0.0056474754,0.2896184,0.51898676,0.12886946,0.014737547,0.0028916916],"about_ca_topic_score_codex":0.0000051172206,"about_ca_topic_score_gemma":0.000010309622,"teacher_disagreement_score":0.51507044,"about_ca_system_score_codex":0.00012273216,"about_ca_system_score_gemma":0.000013172409,"threshold_uncertainty_score":0.9999884},"labels":[],"label_agreement":null},{"id":"W3161035279","doi":"10.1088/1757-899x/989/1/012001","title":"Status of building information modelling (BIM) in construction practice-UK context","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Anglia Ruskin University","keywords":"Building information modeling; Construction industry; Context (archaeology); Process (computing); Business; Building construction; Construction engineering; Questionnaire; Process management; Knowledge management; Engineering management; Architectural engineering; Engineering; Operations management; Computer science; Sociology","score_opus":0.0174436461093593,"score_gpt":0.21036165473288165,"score_spread":0.19291800862352235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161035279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8918143,0.00007606082,0.10670812,0.00011926614,0.00054786634,0.000119403754,0.000016553338,0.00011078697,0.00048765703],"genre_scores_gemma":[0.9889081,0.00031993,0.010689405,0.00002979795,0.000032121745,0.000010429907,0.0000036875972,0.000006152865,3.8906566e-7],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99906695,0.000007570275,0.0003553532,0.000119732766,0.00019819663,0.00025219686],"domain_scores_gemma":[0.9995242,0.000018844376,0.00006646164,0.000072928015,0.00021982733,0.00009778277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020460239,0.00012104059,0.00017632457,0.00016682011,0.000048658687,0.00019508251,0.000090537804,0.000053457472,0.00003440117],"category_scores_gemma":[0.00018271891,0.00012686307,0.000009775596,0.00037971247,0.00015338935,0.0027239334,0.00002792327,0.0000883822,0.0000022849931],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003769091,0.0000019262768,0.00006167806,0.00018912261,0.0000066998796,7.7428797e-7,0.0022734406,0.15749888,0.7337317,0.08997315,0.0000038480603,0.016221114],"study_design_scores_gemma":[0.00025833488,0.000053524378,0.00020864757,0.00011695521,0.000008282813,0.000029929253,0.0041266773,0.3554098,0.6373027,0.00024154225,0.0020168335,0.0002268082],"about_ca_topic_score_codex":0.000088393404,"about_ca_topic_score_gemma":0.0000035895275,"teacher_disagreement_score":0.19791092,"about_ca_system_score_codex":0.000054964785,"about_ca_system_score_gemma":0.00009184061,"threshold_uncertainty_score":0.5173326},"labels":[],"label_agreement":null},{"id":"W3163887902","doi":"","title":"Construction Management Project Delivery Method: A Case Study of the Centre Block Rehabilitation Project","year":2021,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Rehabilitation; Project management; Block (permutation group theory); Engineering; Construction engineering; Engineering management; Operations management; Medicine; Systems engineering; Physical therapy; Mathematics","score_opus":0.007999340084644273,"score_gpt":0.21168987977283335,"score_spread":0.20369053968818907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163887902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99699026,0.000052090865,0.00003551252,0.000037119968,0.00077374233,0.0011845079,0.000028450027,0.00007651015,0.0008218017],"genre_scores_gemma":[0.89299434,0.000140337,0.025478026,0.000003028042,0.000055034958,0.000010670936,0.00023280042,0.00006458923,0.081021145],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9988859,0.00019608268,0.00022067026,0.00028437583,0.00027631855,0.00013664535],"domain_scores_gemma":[0.9990841,0.000040787494,0.00021317818,0.00033982308,0.0003014727,0.00002060876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012181754,0.0002114317,0.0003107528,0.00034741889,0.0001531379,0.000016886792,0.00015747713,0.00018984514,0.00004437621],"category_scores_gemma":[0.000007733184,0.00020809995,0.00017765517,0.000519915,0.00005487242,0.00015017914,0.000037041078,0.00022928679,0.0000015006178],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003189708,0.000559445,0.0027731254,0.0046019224,0.0019200862,0.00045317766,0.8538308,0.0038360106,0.0030135834,0.0008173753,0.0036008167,0.12427468],"study_design_scores_gemma":[0.0006854256,0.000105325955,0.0012966595,0.00021415128,0.00051502296,0.000122054174,0.9942227,0.0014743723,0.0008670791,0.000022001424,0.0002771697,0.0001980392],"about_ca_topic_score_codex":0.03193047,"about_ca_topic_score_gemma":0.10991316,"teacher_disagreement_score":0.14039189,"about_ca_system_score_codex":0.00012350935,"about_ca_system_score_gemma":0.00007257303,"threshold_uncertainty_score":0.974516},"labels":[],"label_agreement":null},{"id":"W3163912362","doi":"","title":"Building SMARTer : an introduction to open BIM as the foundation for a Canadian National BIM Standard","year":2018,"lang":"en","type":"article","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"National standard; Foundation (evidence); Building information modeling; Engineering; Architectural engineering; Construction engineering; Political science; Operations management; Law","score_opus":0.012393464637209719,"score_gpt":0.26805843450365735,"score_spread":0.25566496986644766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163912362","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47264922,0.000030534822,0.4257799,0.0753282,0.009117171,0.0025590719,0.00013426277,0.00039762649,0.014004006],"genre_scores_gemma":[0.9854413,0.0000016912446,0.010389414,0.0005811761,0.0027814265,0.00017155935,0.000045938235,0.000029416302,0.0005580511],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99928206,0.000024598032,0.00013111306,0.00020131042,0.00016672393,0.0001941723],"domain_scores_gemma":[0.9993295,0.000021225156,0.000026271351,0.00017814737,0.00032570705,0.00011911706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033978335,0.000105946994,0.000080438964,0.00017969123,0.00035085727,0.00035232923,0.00019249052,0.00006280988,0.00043994456],"category_scores_gemma":[0.00009957135,0.0000910243,0.00002518967,0.00026432297,0.000037180158,0.0004957962,0.000017162058,0.000082898165,0.00011860196],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017944163,0.000012923453,0.00021979489,0.000015348041,0.0000968412,4.2962697e-7,0.0021678547,0.0037966927,0.007734484,0.743557,0.09257664,0.14964256],"study_design_scores_gemma":[0.00025335664,0.00014105692,0.00087223377,0.000009968068,0.00000945042,0.000013292174,0.0003829015,0.009218262,0.0048493356,0.008162153,0.97592455,0.00016341129],"about_ca_topic_score_codex":0.0034944832,"about_ca_topic_score_gemma":0.14239661,"teacher_disagreement_score":0.8833479,"about_ca_system_score_codex":0.00037378087,"about_ca_system_score_gemma":0.00019148529,"threshold_uncertainty_score":0.8732524},"labels":[],"label_agreement":null},{"id":"W3165117314","doi":"10.3389/fbuil.2021.612668","title":"Cybersecurity in Construction: Where Do We Stand and How Do We Get Better Prepared","year":2021,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"York University; New York University Abu Dhabi","keywords":"Domain (mathematical analysis); Computer security; Engineering; Architecture; Computer science; Engineering management","score_opus":0.004494003992980958,"score_gpt":0.17274716502923926,"score_spread":0.16825316103625831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165117314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8008709,0.1562947,0.032120515,0.005417998,0.0029781442,0.0004354414,0.00007453197,0.00011440168,0.0016933503],"genre_scores_gemma":[0.87273854,0.0748869,0.051565308,0.000028134307,0.00016718086,0.00010272098,0.000011689774,0.000044557066,0.00045497253],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912065,0.00005046137,0.00018706701,0.00028543483,0.00016063121,0.00019573169],"domain_scores_gemma":[0.99966407,0.000010276627,0.000031019146,0.0002303655,0.000005526235,0.00005872542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000073914525,0.00016521978,0.00019445072,0.00009676087,0.000034387933,0.000066612156,0.000059714992,0.00014396227,0.0002520527],"category_scores_gemma":[0.000004492053,0.00018243116,0.000034622542,0.00009460668,0.00012345906,0.00018024092,0.00003645487,0.00023070473,0.000004398498],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050578048,0.00007753735,0.434312,0.00028945445,0.0001385385,0.00009849737,0.003608116,0.004550092,0.0015194415,0.0009839854,0.046118144,0.50825363],"study_design_scores_gemma":[0.0019455801,0.000037278878,0.020966997,0.00038178303,0.00003721588,0.00010384327,0.009589326,0.005938288,0.0037303078,0.00894822,0.94768506,0.0006360983],"about_ca_topic_score_codex":0.000004887848,"about_ca_topic_score_gemma":0.000039155864,"teacher_disagreement_score":0.9015669,"about_ca_system_score_codex":0.00027089394,"about_ca_system_score_gemma":0.000014652348,"threshold_uncertainty_score":0.74393266},"labels":[],"label_agreement":null},{"id":"W3165549301","doi":"10.11159/iccste21.147","title":"A Methodology Proposal of an Accessible Design for an UrbanIntersection to Improve Mobility of People with Physical Disabilities","year":2021,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Intersection (aeronautics); Computer science; Transport engineering; Engineering","score_opus":0.03044178241201941,"score_gpt":0.26549018369222477,"score_spread":0.23504840128020535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165549301","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97679245,0.0000033396584,0.022558633,0.000052675852,0.00020915832,0.00022464269,0.00006618371,0.000028650782,0.00006429079],"genre_scores_gemma":[0.98680884,0.0000016735645,0.013074209,0.0000026207986,0.000032930016,0.000049385828,0.000013456102,0.000009592828,0.0000073104907],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994153,0.0000047532803,0.00021543157,0.00015055334,0.00014233301,0.0000716767],"domain_scores_gemma":[0.99933493,0.00004604773,0.00007334351,0.00004904201,0.0004647201,0.00003189239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007789261,0.00010368957,0.00016891726,0.000055193097,0.000020251751,0.00001814464,0.000114157,0.000035918747,0.000011483354],"category_scores_gemma":[0.0000392561,0.00007658993,0.000041232437,0.000106607615,0.000039338905,0.00031806968,0.0000041473895,0.000071537674,1.8132033e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027723506,0.000031504725,0.0023232917,0.00038706718,0.00007626105,3.3950247e-8,0.004009777,0.042760056,0.8311544,0.11708666,0.0000016776467,0.0018920059],"study_design_scores_gemma":[0.0002878228,0.00037566622,0.03244543,0.00009005904,0.000033983615,0.000004696443,0.002263256,0.18777242,0.7702258,0.006393287,0.000001894585,0.00010564801],"about_ca_topic_score_codex":0.000030845305,"about_ca_topic_score_gemma":0.00013407484,"teacher_disagreement_score":0.14501236,"about_ca_system_score_codex":0.000020755955,"about_ca_system_score_gemma":0.000028402492,"threshold_uncertainty_score":0.31232467},"labels":[],"label_agreement":null},{"id":"W3166475402","doi":"10.1155/2021/9953732","title":"A Dynamic Just‐in‐Time Component Delivery Framework for Off‐Site Construction","year":2021,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick","funders":"","keywords":"Component (thermodynamics); Computer science; Physics","score_opus":0.004130429474527127,"score_gpt":0.2135312342633691,"score_spread":0.20940080478884196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3166475402","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3297031,0.018717635,0.64737666,0.000043348664,0.0026176616,0.00025453148,0.000032582127,0.0004071654,0.000847345],"genre_scores_gemma":[0.9239866,0.002760921,0.07294583,0.000019204599,0.0000777981,0.000102048994,0.000041798085,0.000041184867,0.000024592875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991579,0.00000840236,0.0002855921,0.0001979741,0.000107115375,0.00024299938],"domain_scores_gemma":[0.9996206,0.00013347581,0.00002425747,0.00014526943,0.000039112812,0.000037260867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006845668,0.00015870346,0.00020005609,0.00017441619,0.000022832308,0.000028323937,0.000074116935,0.00011678145,0.000056502024],"category_scores_gemma":[0.000047908758,0.00019569237,0.000057104757,0.00034352142,0.000019659687,0.0003471046,0.000015764152,0.0002486432,0.000011644835],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010863138,0.000015473634,0.0013613857,0.00019420759,0.000015416355,0.000012061724,0.00012446089,0.93232894,0.008177534,0.0074746967,0.000011485148,0.05027346],"study_design_scores_gemma":[0.00051722745,0.000013821055,0.0019171041,0.0004980481,0.000011348677,0.000063483174,0.00013273345,0.97972906,0.0027862338,0.002539529,0.011453995,0.00033742655],"about_ca_topic_score_codex":0.0000021539374,"about_ca_topic_score_gemma":0.000225595,"teacher_disagreement_score":0.5942835,"about_ca_system_score_codex":0.00018277865,"about_ca_system_score_gemma":0.000015336544,"threshold_uncertainty_score":0.79801035},"labels":[],"label_agreement":null},{"id":"W3167790180","doi":"10.1108/ecam-12-2020-1060","title":"Mixed qualitative–quantitative approach for bidding decisions in construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; Quantitative analysis (chemistry); Decision support system; Reuse; Qualitative property; Operations research; Management science; Knowledge management; Data mining; Machine learning; Business; Engineering; Marketing","score_opus":0.02858960551835073,"score_gpt":0.2619158157200169,"score_spread":0.23332621020166613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167790180","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18607035,0.00024065838,0.80884874,0.00006623884,0.0016622696,0.00040950367,0.000026009964,0.0004005493,0.0022756604],"genre_scores_gemma":[0.46928793,0.00006387263,0.53021026,0.000008823671,0.00006502754,0.00020126223,0.00007904486,0.00003257952,0.000051195904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851555,0.00006064506,0.0004922503,0.00038039626,0.00020351635,0.0003476164],"domain_scores_gemma":[0.99933726,0.00021488326,0.00005486286,0.00021856243,0.00009641249,0.000078001416],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021439654,0.000276034,0.00027815442,0.00054318673,0.00010780183,0.000084957785,0.000108827466,0.0000914509,0.000030115469],"category_scores_gemma":[0.0001000686,0.0003014294,0.0001339272,0.0007431793,0.00008571807,0.00020171583,0.00003863585,0.00026752698,0.000006613939],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002679582,0.000016464106,0.000063967935,0.00016321159,0.00015905921,0.000006087158,0.0009876055,0.56444323,0.0031660118,0.21162249,0.00006569405,0.2192794],"study_design_scores_gemma":[0.0021829228,0.00006378002,0.002432759,0.00029214734,0.00009419511,0.00048664096,0.021521324,0.9487471,0.009158118,0.008061107,0.005988647,0.00097123184],"about_ca_topic_score_codex":0.0000041113303,"about_ca_topic_score_gemma":0.000011932214,"teacher_disagreement_score":0.3843039,"about_ca_system_score_codex":0.00018209264,"about_ca_system_score_gemma":0.000017303935,"threshold_uncertainty_score":0.9999438},"labels":[],"label_agreement":null},{"id":"W3168304808","doi":"10.1108/ecam-10-2020-0810","title":"Formalizing knowledge representation in earthwork operations through development of domain ontology","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Earthworks; Computer science; Context (archaeology); Domain (mathematical analysis); Interoperability; Software engineering; Engineering; World Wide Web; Mathematics","score_opus":0.010687857085148515,"score_gpt":0.22995428899990153,"score_spread":0.219266431914753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3168304808","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6643913,0.00033292078,0.32899234,0.000045339635,0.00097655127,0.0001782949,0.0000018791548,0.00018425328,0.0048971404],"genre_scores_gemma":[0.75328076,0.000027873817,0.2464994,0.0000054360166,0.00004190917,0.000058305293,0.000025446898,0.000014528946,0.000046321533],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989687,0.000028645927,0.00048039152,0.00019613211,0.00011708125,0.00020901646],"domain_scores_gemma":[0.999696,0.000023322837,0.0000272892,0.0001715553,0.000049669743,0.000032158485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000077737524,0.00015765647,0.00018508261,0.00023710018,0.00006693258,0.000027154085,0.00007350356,0.0000587132,0.00006112148],"category_scores_gemma":[0.000010005531,0.00017584838,0.000053817617,0.0005316422,0.0000359325,0.00017729231,0.000041637933,0.0001676807,0.000009151244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001118927,0.000025631642,0.0008731063,0.00027984174,0.00015708666,0.000012555454,0.005369597,0.64505607,0.011371817,0.06638203,0.000021694257,0.27043936],"study_design_scores_gemma":[0.006325692,0.00010312311,0.11337176,0.0018135462,0.00016832774,0.0016135955,0.021593805,0.3588137,0.41519633,0.009703028,0.0684669,0.0028302101],"about_ca_topic_score_codex":0.000006057939,"about_ca_topic_score_gemma":0.00024139916,"teacher_disagreement_score":0.4038245,"about_ca_system_score_codex":0.000111692854,"about_ca_system_score_gemma":0.000025823569,"threshold_uncertainty_score":0.71708894},"labels":[],"label_agreement":null},{"id":"W3169345524","doi":"10.3390/laws10020043","title":"Building Information Modeling in Quebec’s Procurement for Public Infrastructure: A Case for Integrated Project Delivery","year":2021,"lang":"en","type":"article","venue":"Laws","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Building information modeling; Normative; Process (computing); Business; Adjudication; Integrated project delivery; Legislation; Process management; Legislature; Risk analysis (engineering); Computer science; Operations management; Engineering; Marketing; Construction management; Law","score_opus":0.02299288409809637,"score_gpt":0.2351190224829935,"score_spread":0.21212613838489713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169345524","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26439315,0.00008106925,0.7340312,0.00008889413,0.00036716033,0.000661077,0.000040397692,0.00013984051,0.00019719682],"genre_scores_gemma":[0.95618844,0.000010312281,0.042921618,0.000059012287,0.000060893613,0.00056722324,0.00015120431,0.000014017353,0.000027255735],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935615,0.000010480404,0.00029088475,0.00009947241,0.000068151334,0.00017483816],"domain_scores_gemma":[0.9995736,0.000020206751,0.000030897256,0.00008688393,0.0002633803,0.000025022318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000095714226,0.000108831264,0.00010957762,0.00014472226,0.000059858325,0.0001478487,0.000043314216,0.000082346676,0.000010555371],"category_scores_gemma":[0.00007049784,0.00010626183,0.000049560655,0.00025297148,0.0000070321967,0.0007668051,0.000009433899,0.000103161925,7.974462e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006610313,0.00002232768,0.00009551267,0.00057514035,0.00007269321,0.000013949356,0.00138632,0.12320705,0.0029642712,0.035946015,0.0022785906,0.833372],"study_design_scores_gemma":[0.0005505733,0.00001664672,0.00000685261,0.000034551296,0.000010578068,0.00011373393,0.0009990524,0.9617199,0.0036067888,0.0009989127,0.03180704,0.0001354183],"about_ca_topic_score_codex":0.00055999635,"about_ca_topic_score_gemma":0.011032409,"teacher_disagreement_score":0.8385128,"about_ca_system_score_codex":0.00021749923,"about_ca_system_score_gemma":0.00017384444,"threshold_uncertainty_score":0.6156343},"labels":[],"label_agreement":null},{"id":"W3169371903","doi":"10.5430/ijhe.v10n6p57","title":"Computing Competency for Civil Engineering Graduates: Recent Updates and Developments in Saudi Arabia and the US","year":2021,"lang":"en","type":"article","venue":"International Journal of Higher Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Curriculum; Engineering education; Engineering management; Informatics engineering; Computer science; Civil engineering; Engineering; Mechanical engineering; Political science; Law","score_opus":0.008227102617932623,"score_gpt":0.24536778838991935,"score_spread":0.23714068577198671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169371903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97746795,0.0062136264,0.0041608205,0.004566902,0.006600842,0.00011520869,0.000003519627,0.000018850538,0.0008522977],"genre_scores_gemma":[0.99439716,0.0007728101,0.004390446,0.00012737064,0.00023656216,0.000005367849,0.000009566436,0.0000070473266,0.000053676045],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99948865,0.0000145540635,0.00027063975,0.000057766327,0.0001094616,0.000058896716],"domain_scores_gemma":[0.99947745,0.00008184721,0.00007472519,0.000028784481,0.00031358213,0.000023643708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013225827,0.00006283827,0.00008955196,0.00009778869,0.000022776589,0.00007033956,0.00006289111,0.00002472729,0.000019008568],"category_scores_gemma":[0.000037298247,0.000050939387,0.00002066321,0.000070627895,0.000019665851,0.0001344429,0.000011711785,0.00009641495,4.3976252e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002656892,0.00027771937,0.12905608,0.00024389423,0.0009509085,0.000015538915,0.005782682,0.022070767,0.00957575,0.24785051,0.0067616985,0.5771488],"study_design_scores_gemma":[0.0048234076,0.00003781589,0.79089075,0.00088914623,0.00006920625,0.0009356325,0.00082153676,0.02421579,0.0051206658,0.02101289,0.15077186,0.000411309],"about_ca_topic_score_codex":0.0000047494586,"about_ca_topic_score_gemma":0.000019210627,"teacher_disagreement_score":0.66183466,"about_ca_system_score_codex":0.00007659987,"about_ca_system_score_gemma":0.00008023749,"threshold_uncertainty_score":0.20772478},"labels":[],"label_agreement":null},{"id":"W3177167349","doi":"10.1109/icitm52822.2021.00010","title":"The Formation of Clusters for the Assignment of Multiple Project Managers Problem","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bridge (graph theory); Project portfolio management; Dependency (UML); Portfolio; Computer science; Project manager; Project management; Design structure matrix; Operations research; Software engineering; Systems engineering; Engineering; Business","score_opus":0.013155508905857252,"score_gpt":0.21259234218671086,"score_spread":0.1994368332808536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3177167349","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056809825,0.00019338714,0.97989225,0.0004490216,0.0003033531,0.00064395164,0.0000076267115,0.000043960004,0.012785474],"genre_scores_gemma":[0.99613917,0.000058710564,0.0032931028,0.000010473737,0.000010750447,0.00008830543,0.0000044370486,0.0000040116915,0.00039104614],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997203,0.00000796411,0.00013613173,0.000028185897,0.000060235063,0.000047201982],"domain_scores_gemma":[0.9997356,0.00009907264,0.000028722034,0.00008082173,0.000051904997,0.0000038956687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008301048,0.000031490355,0.000037508224,0.0000120616005,0.000042477826,0.000010658001,0.000039636714,0.000016280212,0.0000059373547],"category_scores_gemma":[0.000010668093,0.000016585285,0.000036123973,0.00006327816,0.000017783392,0.00005810953,0.0000057313305,0.000022664946,3.8759268e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007207488,0.000038233637,0.00027984587,0.0008306345,0.00030582395,1.7436092e-7,0.0032624183,0.10718573,0.03815329,0.080636464,0.02676994,0.7424654],"study_design_scores_gemma":[0.0003419135,0.000022929691,0.00012014568,0.0000232776,0.000024735882,0.000002971207,0.0074807126,0.7621276,0.20544429,0.0005006232,0.023858473,0.00005236253],"about_ca_topic_score_codex":0.000010607689,"about_ca_topic_score_gemma":0.000099608995,"teacher_disagreement_score":0.9904582,"about_ca_system_score_codex":0.000015855696,"about_ca_system_score_gemma":0.000010045626,"threshold_uncertainty_score":0.06763283},"labels":[],"label_agreement":null},{"id":"W3177629667","doi":"10.5430/ijhe.v11n1p31","title":"Introducing BIM in Curricular Programs of Civil Engineering","year":2021,"lang":"en","type":"article","venue":"International Journal of Higher Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bachelor; Building information modeling; Architecture; Principal (computer security); Engineering; Engineering management; Engineering ethics; Engineering education; Subject (documents); Construction engineering; Computer science; Political science; Library science","score_opus":0.005290554951063708,"score_gpt":0.23987252878361337,"score_spread":0.23458197383254967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3177629667","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97277296,0.003510902,0.00640709,0.0008404741,0.014133421,0.00005990381,0.0000019410154,0.00003140222,0.0022419011],"genre_scores_gemma":[0.99634373,0.000082123566,0.002775971,0.000020108535,0.0006634487,0.0000042140914,0.000010024928,0.000009536181,0.00009084401],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9992549,0.000013264831,0.0003844887,0.000060243376,0.00022256722,0.00006452387],"domain_scores_gemma":[0.9992468,0.000015753792,0.00010618464,0.00006429618,0.00053856196,0.000028422883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009218594,0.00006549485,0.000105102175,0.00024787366,0.0000051677316,0.000030015173,0.00011236534,0.000041282845,0.00020747371],"category_scores_gemma":[0.000028160004,0.000065849614,0.000059732265,0.00020549844,0.000009162783,0.00023006502,0.000008478399,0.00014623052,0.0000026463267],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005137908,0.0010713041,0.13950722,0.00022524837,0.0006678711,0.00006817617,0.0017559862,0.16989435,0.13901544,0.09636399,0.005453717,0.44592533],"study_design_scores_gemma":[0.0033963502,0.00022714135,0.47750637,0.0039794757,0.00017360735,0.0023634743,0.0020667652,0.021757845,0.19462362,0.016564112,0.2762023,0.0011389317],"about_ca_topic_score_codex":0.000008442332,"about_ca_topic_score_gemma":0.000018231238,"teacher_disagreement_score":0.4447864,"about_ca_system_score_codex":0.00013889211,"about_ca_system_score_gemma":0.00011315679,"threshold_uncertainty_score":0.26852694},"labels":[],"label_agreement":null},{"id":"W3178654013","doi":"10.3390/buildings11070291","title":"A Taxonomy of Sources of Waste in BIM Information Flows","year":2021,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Taxonomy (biology); Design science research; Computer science; Process (computing); Work (physics); Data science; Construction engineering; Systems engineering; Process management; Management science; Engineering; Knowledge management; Information system; Compatibility (geochemistry)","score_opus":0.007247556843511987,"score_gpt":0.17608787174049173,"score_spread":0.16884031489697973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3178654013","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9880093,0.00010045107,0.00899976,0.000013087928,0.000104011146,0.000037868056,0.0000032049147,0.00001943715,0.0027129245],"genre_scores_gemma":[0.99671143,0.000016876998,0.0032288115,0.000006368903,0.000012634447,0.000008993135,0.0000031712743,0.000002300223,0.000009430475],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996969,0.000003630352,0.00018108534,0.000026059603,0.000048949343,0.000043336408],"domain_scores_gemma":[0.999854,0.000009214029,0.000031803964,0.00005090475,0.00004503532,0.000008999678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000034512293,0.00003448698,0.00007058275,0.00008452699,0.0000049251494,0.000006339019,0.000027888123,0.00003191196,0.00004322291],"category_scores_gemma":[0.000015605652,0.000035839406,0.000022188055,0.00016521683,0.000009372234,0.0001934953,0.0000066320586,0.000038481896,0.0000026024265],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003251137,0.000040155523,0.034915376,0.001032284,0.0000926341,0.0000026958771,0.0076847323,0.11598191,0.2045646,0.06797788,0.001212175,0.56646305],"study_design_scores_gemma":[0.0005311552,0.000018950092,0.0020725538,0.00017529762,0.000010578413,0.000017193113,0.0039879717,0.047368977,0.87845254,0.00049093476,0.066727616,0.00014626065],"about_ca_topic_score_codex":0.000026603142,"about_ca_topic_score_gemma":0.00001853525,"teacher_disagreement_score":0.6738879,"about_ca_system_score_codex":0.0000126399555,"about_ca_system_score_gemma":0.000013577758,"threshold_uncertainty_score":0.14614886},"labels":[],"label_agreement":null},{"id":"W3180630644","doi":"10.1155/2021/6638236","title":"Building Information Modelling‐ (BIM‐) Based Generative Design for Drywall Installation Planning in Prefabricated Construction","year":2021,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Construction engineering; Architectural engineering; Computer science; Engineering; Civil engineering; Operations management","score_opus":0.014433801678058212,"score_gpt":0.2274941224769639,"score_spread":0.2130603207989057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3180630644","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019182997,0.0010202889,0.9783552,0.000013499861,0.0005645934,0.00024690002,0.000006747474,0.00020318091,0.0004065815],"genre_scores_gemma":[0.6981869,0.00009621719,0.30148453,0.000010868819,0.000041143307,0.00011759606,0.000045056775,0.000016636559,0.0000010987662],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911547,0.000017674894,0.00039627336,0.00014948903,0.000108612454,0.00021250303],"domain_scores_gemma":[0.9996148,0.000119635035,0.000051037754,0.000095491145,0.00008867155,0.000030407577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014024194,0.00016066663,0.00016351251,0.00033553236,0.000035663255,0.00005044478,0.000053541386,0.00010436556,0.000007623581],"category_scores_gemma":[0.00006236935,0.00019695699,0.00003329222,0.0004953193,0.000012234562,0.001422861,0.0000069586026,0.00017915404,9.815795e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012998985,0.0000045998486,0.00027000275,0.00009632835,0.00000610795,0.0000012372692,0.00018193414,0.9766701,0.0027677848,0.007432504,0.0000034156553,0.01255303],"study_design_scores_gemma":[0.0005653706,0.00001300293,0.00009847587,0.00018741706,0.000004712338,0.0000066104726,0.00009493171,0.9751846,0.0195609,0.0017223645,0.002358976,0.0002026308],"about_ca_topic_score_codex":0.0000034087755,"about_ca_topic_score_gemma":0.000039047936,"teacher_disagreement_score":0.6790039,"about_ca_system_score_codex":0.00023173119,"about_ca_system_score_gemma":0.000041861174,"threshold_uncertainty_score":0.8031673},"labels":[],"label_agreement":null},{"id":"W3182197800","doi":"10.3390/a14070214","title":"Hybrid Artificial Intelligence HFS-RF-PSO Model for Construction Labor Productivity Prediction and Optimization","year":2021,"lang":"en","type":"article","venue":"Algorithms","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Random forest; Computer science; Feature selection; Selection (genetic algorithm); Artificial intelligence; Productivity; Mathematical optimization; Machine learning; Mathematics","score_opus":0.016254053047665435,"score_gpt":0.2224982946134684,"score_spread":0.20624424156580295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182197800","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017936917,0.00019347135,0.9797551,0.00021491859,0.0011961494,0.00021723968,0.00012784885,0.00023561897,0.00012274677],"genre_scores_gemma":[0.51749355,0.00037675697,0.48065758,0.000032679447,0.00077710376,0.00017052688,0.00025398328,0.0000449871,0.00019284023],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992983,0.000013004459,0.00021526097,0.00024185375,0.00009847739,0.00013312069],"domain_scores_gemma":[0.9995511,0.000020162497,0.00003318712,0.00012555481,0.00022623167,0.000043764787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008825868,0.00011420103,0.00011277579,0.000059032856,0.00011411262,0.000067072,0.000030178158,0.000070113536,0.000021551728],"category_scores_gemma":[0.000048495644,0.00012742491,0.000027201708,0.00014176627,0.000060978306,0.00032222972,0.00001006485,0.000100095815,0.000002357992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075934163,0.000013075769,0.000023104009,0.000028706518,0.000017526165,6.635904e-7,0.000084119536,0.57960325,0.0030556724,0.0048153833,0.000078563644,0.41227233],"study_design_scores_gemma":[0.000060712213,0.000018374589,0.000018427409,0.0000105645,0.000024096174,0.00009317407,0.000116904666,0.9080004,0.07855438,0.012765888,0.00022682731,0.00011025832],"about_ca_topic_score_codex":0.000003106088,"about_ca_topic_score_gemma":0.00000776959,"teacher_disagreement_score":0.49955663,"about_ca_system_score_codex":0.00004665449,"about_ca_system_score_gemma":0.00004337172,"threshold_uncertainty_score":0.5196237},"labels":[],"label_agreement":null},{"id":"W3183380919","doi":"10.29173/mocs173","title":"Productivity-Based Management System for Offsite Manufacturing: Case Study of Noralta Lodge","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Duration (music); Modular design; Task (project management); Quality (philosophy); Engineering; Workforce; Project management; Control (management); Operations management; Construction management; Computer science; Civil engineering; Systems engineering","score_opus":0.017461549440775877,"score_gpt":0.2129587948924664,"score_spread":0.19549724545169053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183380919","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9822827,0.00015461972,0.014039729,0.00002809568,0.0009435523,0.0012659008,0.000023062285,0.0003662414,0.0008961161],"genre_scores_gemma":[0.9938385,0.0000064050073,0.005632827,0.0000064532755,0.00016907863,0.00017668569,0.000012329677,0.000042733933,0.00011497065],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984938,0.000015133881,0.00047818437,0.00046062653,0.0002844625,0.0002677991],"domain_scores_gemma":[0.9991234,0.000012351955,0.00015719472,0.00019625525,0.0003512269,0.00015958524],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029298314,0.00030429263,0.00037039997,0.0003725554,0.00017313067,0.00011340708,0.00010412717,0.00012433354,0.000005052653],"category_scores_gemma":[0.000009477897,0.00030557349,0.000080829435,0.00025545465,0.000105801424,0.00042378835,0.000035784604,0.0001583117,0.0000032532462],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014668738,0.0012818478,0.17398357,0.017237768,0.0023701587,0.00049359933,0.008973545,0.019219518,0.009425182,0.02241851,0.0065567875,0.7365726],"study_design_scores_gemma":[0.032676987,0.0035435313,0.006600672,0.0015443601,0.0029004635,0.009139055,0.30815274,0.22180855,0.33557343,0.0015128163,0.07175605,0.0047913324],"about_ca_topic_score_codex":0.00005364122,"about_ca_topic_score_gemma":0.000046376626,"teacher_disagreement_score":0.7317813,"about_ca_system_score_codex":0.0001376975,"about_ca_system_score_gemma":0.000019405785,"threshold_uncertainty_score":0.9999396},"labels":[],"label_agreement":null},{"id":"W3183638180","doi":"10.1108/sasbe-04-2021-0068","title":"A generative design approach for modular construction in congested urban areas","year":2021,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Modular design; Generative Design; Constructability; Systems engineering; Building information modeling; Computer science; Iterative design; Parametric design; Engineering design process; Modularity (biology); Engineering; Parametric statistics; Industrial engineering","score_opus":0.009990784575022924,"score_gpt":0.181723473065796,"score_spread":0.17173268849077308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183638180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15073733,0.0017327778,0.8452731,0.00008966406,0.00010915355,0.00058135076,0.000005947772,0.000056402925,0.0014143024],"genre_scores_gemma":[0.9428304,0.0003146827,0.054488126,0.000034231507,0.0000739787,0.00043695976,0.00007585361,0.000025321817,0.0017204786],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927205,0.000042989363,0.0001588115,0.00020709456,0.00007496974,0.00024411442],"domain_scores_gemma":[0.99976784,0.000019243684,0.000018001268,0.00011985091,0.000025306108,0.000049780814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012851872,0.00012673803,0.00014072767,0.000064255735,0.000091245456,0.00004239925,0.000028794248,0.000089122484,0.000033770433],"category_scores_gemma":[0.000011323112,0.00013321397,0.0000295159,0.00008024654,0.000062899664,0.00011763671,0.000019058794,0.00008533773,0.0000010831761],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002451813,0.00034192306,0.035121925,0.0009693695,0.0003949545,0.0001354108,0.0035352441,0.6763037,0.028700009,0.17905661,0.0037718464,0.07142384],"study_design_scores_gemma":[0.0036774892,0.00019799403,0.011874351,0.000032497726,0.0001051729,0.000180891,0.026999628,0.8259536,0.053211335,0.01715366,0.059642635,0.000970747],"about_ca_topic_score_codex":0.000013336237,"about_ca_topic_score_gemma":0.0000036053755,"teacher_disagreement_score":0.79209304,"about_ca_system_score_codex":0.00016711155,"about_ca_system_score_gemma":0.000029550778,"threshold_uncertainty_score":0.5432308},"labels":[],"label_agreement":null},{"id":"W3184099511","doi":"10.29173/mocs179","title":"Construction-Centric Building Information Modelling to Facilitate Building Panel Prefabrication","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Building information modeling; Engineering; Construction engineering; Architecture; Architectural engineering; Interface (matter); Construction industry; Application programming interface; Production (economics); Civil engineering; Computer science; Operations management","score_opus":0.033752157743767164,"score_gpt":0.2027848462149963,"score_spread":0.16903268847122913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184099511","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5297316,0.00022512469,0.4663629,0.0001195678,0.000981487,0.0003821423,0.00002156494,0.0005287106,0.0016469454],"genre_scores_gemma":[0.9052497,0.00014119134,0.094106816,0.00006866907,0.00022568704,0.00007923798,0.000034621018,0.0000345279,0.000059557184],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979745,0.00001639327,0.0007059091,0.00041456983,0.00044705177,0.00044156867],"domain_scores_gemma":[0.99853337,0.00002050878,0.00017005455,0.00016524535,0.0007171208,0.00039372162],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032730482,0.00038106943,0.00033299037,0.00074281386,0.00030439728,0.00044038458,0.00016001843,0.00024054454,0.000021457183],"category_scores_gemma":[0.000072682495,0.00041815534,0.000086946144,0.0009039964,0.00014703679,0.0025866595,0.000056772376,0.00032934482,0.000052165524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020182098,0.00003648378,0.02349642,0.00057010126,0.00024227622,0.0000021646656,0.0050358367,0.19960594,0.016507166,0.11195661,0.0029109744,0.6394342],"study_design_scores_gemma":[0.0019592966,0.00014231294,0.0009898294,0.0002487438,0.0001607283,0.00045722205,0.0075183944,0.8476563,0.016750246,0.0090889,0.113673605,0.001354417],"about_ca_topic_score_codex":0.00006125874,"about_ca_topic_score_gemma":0.0000032959088,"teacher_disagreement_score":0.64805037,"about_ca_system_score_codex":0.00032037,"about_ca_system_score_gemma":0.000054619857,"threshold_uncertainty_score":0.999827},"labels":[],"label_agreement":null},{"id":"W3184732091","doi":"10.29173/mocs183","title":"Modular Home off-site Construction Production Line Improvement","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Productivity; Factory (object-oriented programming); Production line; Manufacturing engineering; Production (economics); Lean construction; Upstream (networking); Resource (disambiguation); Engineering; Lean manufacturing; Systems engineering; Computer science; Construction engineering; Construction industry","score_opus":0.00998583704053503,"score_gpt":0.19080182529070538,"score_spread":0.18081598825017037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184732091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98031974,0.0012902229,0.010188714,0.00032667062,0.004370053,0.0006197962,0.000030871655,0.0009787062,0.0018752095],"genre_scores_gemma":[0.98739266,0.00066186505,0.010088926,0.00006596636,0.0010799336,0.000103616345,0.00007922652,0.00008157357,0.00044625293],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99749184,0.000018699706,0.00071018713,0.00074534083,0.00053593307,0.0004979975],"domain_scores_gemma":[0.9984017,0.000008695534,0.00020423702,0.00025726313,0.000763755,0.00036435807],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00036993594,0.00051487674,0.00045871845,0.0004988207,0.00029400928,0.00029463018,0.00014327493,0.00034854157,0.000060542967],"category_scores_gemma":[0.0000585786,0.0005363204,0.00013096053,0.0006525768,0.00039918488,0.001375773,0.0000633283,0.00047422195,0.000056797842],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021266006,0.000081926846,0.033107545,0.0004274734,0.00030682952,0.0000066838406,0.0010443088,0.0032212867,0.1457931,0.015690299,0.00269914,0.79740876],"study_design_scores_gemma":[0.010592513,0.0017626202,0.015059709,0.0008319095,0.0010858594,0.0038421284,0.018097846,0.2866898,0.33791122,0.02877755,0.2894086,0.005940257],"about_ca_topic_score_codex":0.000035390964,"about_ca_topic_score_gemma":0.000023974471,"teacher_disagreement_score":0.7914685,"about_ca_system_score_codex":0.0002849028,"about_ca_system_score_gemma":0.000059785918,"threshold_uncertainty_score":0.99970883},"labels":[],"label_agreement":null},{"id":"W3185252534","doi":"10.37394/232015.2021.17.73","title":"On the Exploration of Building Information Modeling Capabilities for Promoting Sustainability-related Practices in Construction Projects: Case Studies in China and USA","year":2021,"lang":"en","type":"article","venue":"WSEAS TRANSACTIONS ON ENVIRONMENT AND DEVELOPMENT","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Certification; Sustainability; Building information modeling; Green building; Environmental design; Architectural engineering; Sustainable design; Process (computing); China; Engineering; Engineering management; Systems engineering; Construction engineering; Computer science; Civil engineering; Operations management; Political science","score_opus":0.02864168849830251,"score_gpt":0.2492484376405293,"score_spread":0.2206067491422268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185252534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8910198,0.00012383804,0.108075984,0.00018433596,0.000070733004,0.00047798536,0.0000028946538,0.000015053362,0.000029377541],"genre_scores_gemma":[0.9955789,0.0003105601,0.003787831,0.0000057025077,0.0000030032322,0.00029816775,0.0000046208133,0.000005166211,0.0000060371813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992841,0.000045612265,0.0003542412,0.00012499074,0.00009400824,0.00009704548],"domain_scores_gemma":[0.99968743,0.00012280305,0.0000749604,0.00006553247,0.000033041983,0.00001620827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029613625,0.00010294542,0.000111304595,0.000143336,0.00013882043,0.000025565614,0.0000150384585,0.00005050586,0.000008351794],"category_scores_gemma":[0.00007166812,0.00008730136,0.000014100944,0.000102763624,0.00006595461,0.00061851135,0.0000027872507,0.00012423714,2.3256223e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009807715,0.00012416636,0.0015399152,0.00093624234,0.00010736715,0.000007740285,0.06780991,0.7325509,0.0003719219,0.00719722,0.0000010948764,0.18925546],"study_design_scores_gemma":[0.0018980643,0.00018365645,0.0015468082,0.00049699796,0.00005288974,0.00027159846,0.23166129,0.7278262,0.020830179,0.014566553,0.00018516526,0.0004806005],"about_ca_topic_score_codex":0.000018438845,"about_ca_topic_score_gemma":0.00009361567,"teacher_disagreement_score":0.18877485,"about_ca_system_score_codex":0.0002364054,"about_ca_system_score_gemma":0.000044298333,"threshold_uncertainty_score":0.35600463},"labels":[],"label_agreement":null},{"id":"W3185283405","doi":"10.1139/cjce-2021-0190","title":"Formwork systems selection criteria for building construction projects: a critical review of the literature","year":2021,"lang":"en","type":"review","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formwork; Selection (genetic algorithm); Multiple-criteria decision analysis; Construction engineering; Computer science; Operations research; Risk analysis (engineering); Engineering; Management science; Civil engineering; Business; Artificial intelligence","score_opus":0.019837073169072884,"score_gpt":0.26228933447620206,"score_spread":0.24245226130712919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185283405","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000012142508,0.9639412,0.029881142,0.000019909725,0.005504834,0.00042285596,0.00006793702,0.000020782882,0.00014010366],"genre_scores_gemma":[0.0005580292,0.9967321,0.0016938174,0.000009067269,0.00085757795,0.000060502778,0.000013383815,0.00006247097,0.000013013914],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984352,0.00005881783,0.0009692396,0.000121613135,0.0001537129,0.00026144544],"domain_scores_gemma":[0.9986536,0.0001266512,0.0002582188,0.00015944196,0.0006174991,0.00018457725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035109834,0.00028438252,0.0010517527,0.0003765566,0.000074267286,0.0001354133,0.0002040401,0.00029088883,0.000030722167],"category_scores_gemma":[0.0006142356,0.00022098016,0.00058857416,0.00079928804,0.000034765053,0.00021208466,0.0000057206894,0.0006371913,1.9875519e-7],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017967238,0.0000055216765,0.0000044065455,0.72067225,0.00068328023,0.000020725485,0.00014065318,0.003987328,0.000036241177,0.030086204,0.013483589,0.23087803],"study_design_scores_gemma":[0.000045847577,0.00001528464,2.8288764e-7,0.32507518,0.0003917456,0.0024637568,0.000018842795,0.0011081157,0.000008820208,0.000016808352,0.6706967,0.00015867355],"about_ca_topic_score_codex":0.000016052472,"about_ca_topic_score_gemma":0.00039775466,"teacher_disagreement_score":0.6572131,"about_ca_system_score_codex":0.00041595986,"about_ca_system_score_gemma":0.0009984729,"threshold_uncertainty_score":0.901131},"labels":[],"label_agreement":null},{"id":"W3185388864","doi":"10.29173/mocs151","title":"Development of Conceptual Modular Building Unit Design Framework for Inexperienced Designers at the Pre-Design Stage","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Process (computing); Design process; Systems engineering; Engineering design process; Unit (ring theory); Architectural engineering; Engineering; Modular construction; Conceptual design; Computer science; Building design; Construction engineering; Engineering management; Process management; Work in process; Operations management; Human–computer interaction; Mechanical engineering","score_opus":0.050631562472005835,"score_gpt":0.2567080131264988,"score_spread":0.20607645065449298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185388864","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42737433,0.0003051626,0.57122564,0.000021736916,0.00033692806,0.00051554205,0.0000064983283,0.00013120534,0.0000829809],"genre_scores_gemma":[0.63368475,0.000027271444,0.3658389,0.000022450522,0.00008270265,0.00018248559,0.0000071892628,0.000035719186,0.00011852999],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983611,0.000030680767,0.0005443711,0.00037404307,0.00034488516,0.00034491657],"domain_scores_gemma":[0.9989632,0.00009453111,0.00018619938,0.00014975047,0.0004332055,0.00017315517],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00056739163,0.00032006064,0.00032182442,0.00017349527,0.00036344043,0.00010758,0.00019598557,0.00025006445,0.00003743782],"category_scores_gemma":[0.00013459865,0.00027271948,0.00007355342,0.000369433,0.0005721709,0.00045047773,0.000052614334,0.00022207343,0.0000030483027],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012003859,0.000079649035,0.0057642055,0.00054734293,0.00070225203,0.0000029595328,0.050241776,0.08703005,0.4443257,0.23273031,0.0019639826,0.17541137],"study_design_scores_gemma":[0.0020294231,0.00027990507,0.000377931,0.0002594288,0.00013369376,0.00006531609,0.04042607,0.16640231,0.7596886,0.00683955,0.022578543,0.000919231],"about_ca_topic_score_codex":0.000006105531,"about_ca_topic_score_gemma":0.0000032602584,"teacher_disagreement_score":0.3153629,"about_ca_system_score_codex":0.00017019718,"about_ca_system_score_gemma":0.0001116217,"threshold_uncertainty_score":0.9999725},"labels":[],"label_agreement":null},{"id":"W3185791341","doi":"10.26168/ajce.34.1.4","title":"La recherche action collaborative : une nouvelle approche pour l'intégration du BIM","year":2020,"lang":"fr","type":"article","venue":"Dépôt institutionnel de l'Université libre de Bruxelles (Université Libre de Bruxelles)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Sociology; Philosophy","score_opus":0.04155244893514295,"score_gpt":0.2297301837267506,"score_spread":0.18817773479160765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185791341","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19599013,0.0068978528,0.68395734,0.0452107,0.0018117508,0.0013556607,0.0014841636,0.0020005067,0.06129187],"genre_scores_gemma":[0.84846354,0.021943543,0.103840336,0.0021176809,0.00306752,0.00006059729,0.0016701688,0.00041027236,0.018426344],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99511105,0.001402322,0.00064830895,0.0011025838,0.0005479522,0.0011877677],"domain_scores_gemma":[0.9965784,0.0007874769,0.0004493659,0.0005504315,0.0005799723,0.0010543693],"candidate_categories":["metaepi_narrow","sts","research_integrity","insufficient_payload"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.0006468676,0.0010108148,0.0007644932,0.0006205302,0.0013677891,0.0004179914,0.0010478613,0.0024008946,0.003183384],"category_scores_gemma":[0.000378313,0.0013359328,0.00053951703,0.0042389487,0.00068478304,0.0030088488,0.00036289895,0.002426894,0.00075657875],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003256893,0.0006179753,0.0015168074,0.0011242141,0.001369115,0.0014169986,0.10106902,0.09376021,0.021493457,0.20271668,0.34969673,0.22196192],"study_design_scores_gemma":[0.0063855927,0.0002892853,0.0022498572,0.00057022815,0.0006930231,0.0009402518,0.15829794,0.17307164,0.00690873,0.00228881,0.6467626,0.0015420241],"about_ca_topic_score_codex":0.0014873623,"about_ca_topic_score_gemma":0.00096535153,"teacher_disagreement_score":0.6524734,"about_ca_system_score_codex":0.003961612,"about_ca_system_score_gemma":0.00308907,"threshold_uncertainty_score":0.9999323},"labels":[],"label_agreement":null},{"id":"W3186492530","doi":"10.29173/mocs166","title":"Risk Mitigation through Tolerance Strategies for Design in Modularization","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Rework; Risk analysis (engineering); Modular programming; Maintainability; Reliability engineering; Computer science; Engineering; Business; Embedded system","score_opus":0.01632201230720975,"score_gpt":0.21418602635848605,"score_spread":0.1978640140512763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186492530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45056167,0.00041919854,0.5468247,0.000048013186,0.00054148474,0.00043893972,0.000014295633,0.00022609372,0.00092561863],"genre_scores_gemma":[0.9396136,0.00019108677,0.059742358,0.000028683908,0.00018381664,0.00013617298,0.000032039814,0.000032286975,0.000039944294],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988586,0.000018491419,0.00037384467,0.00032397773,0.00018445335,0.00024064022],"domain_scores_gemma":[0.9993759,0.000020918164,0.000107114545,0.00008292463,0.00032904555,0.000084116306],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025723947,0.00022967061,0.00022868134,0.00017789031,0.00013453339,0.00022968731,0.000075038006,0.00020597444,0.0000074889663],"category_scores_gemma":[0.00004946372,0.00024705406,0.00005015938,0.0003567351,0.00012183674,0.0015353138,0.000011080909,0.00019059076,0.000004252277],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053516775,0.00009944534,0.11105132,0.00077843596,0.00022382727,0.0000036611336,0.009273154,0.23500383,0.03406923,0.32536146,0.0041733715,0.27942708],"study_design_scores_gemma":[0.0027095932,0.00017025131,0.0043697567,0.00014970025,0.00008567778,0.00005995992,0.008300063,0.83915967,0.018398017,0.11863176,0.007243638,0.0007219149],"about_ca_topic_score_codex":0.000037067643,"about_ca_topic_score_gemma":0.000029331972,"teacher_disagreement_score":0.60415584,"about_ca_system_score_codex":0.000108306835,"about_ca_system_score_gemma":0.000048739905,"threshold_uncertainty_score":0.99999815},"labels":[],"label_agreement":null},{"id":"W3186564867","doi":"10.29173/mocs149","title":"BIM-Integrated Simulation of Construction Operations for Lean Production Management","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Procurement; Productivity; Schedule; Production (economics); Computer science; Plan (archaeology); Supply chain; Reliability (semiconductor); Lean manufacturing; Simulation modeling; Reliability engineering; Operations management; Engineering; Business","score_opus":0.01666541407334009,"score_gpt":0.22140367666189392,"score_spread":0.20473826258855382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186564867","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75304645,0.00022681632,0.2410998,0.00011834219,0.002098205,0.0010131656,0.000040920866,0.000474084,0.0018821745],"genre_scores_gemma":[0.95786095,0.000115055685,0.041240923,0.000015050977,0.00025715714,0.000118384356,0.00009490141,0.00004102417,0.00025658493],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848604,0.000010832455,0.0005733197,0.00041124682,0.00027481667,0.00024373768],"domain_scores_gemma":[0.99866825,0.000013481789,0.00011945837,0.00014140608,0.0009201854,0.0001372263],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026137035,0.00028448986,0.0003006183,0.0004418312,0.0002082624,0.00011503365,0.00008766521,0.0001921312,0.000021205055],"category_scores_gemma":[0.000061468316,0.00029357974,0.00009271762,0.0005364067,0.00025128628,0.0008191862,0.00002140709,0.00016795985,0.0000056870495],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039681036,0.000106163796,0.014367159,0.0010614042,0.0005287486,0.0000012542666,0.0012999189,0.30042538,0.022381784,0.19292776,0.0028593803,0.46364424],"study_design_scores_gemma":[0.0029404745,0.00029546436,0.0011212607,0.00029046112,0.00040873277,0.00017145481,0.0142551055,0.8810345,0.0543906,0.009846062,0.03427746,0.0009684232],"about_ca_topic_score_codex":0.000017660626,"about_ca_topic_score_gemma":0.000022223843,"teacher_disagreement_score":0.58060914,"about_ca_system_score_codex":0.00014223573,"about_ca_system_score_gemma":0.000034349847,"threshold_uncertainty_score":0.99995166},"labels":[],"label_agreement":null},{"id":"W3186607705","doi":"10.36680/j.itcon.2021.021","title":"Maturity-based mapping of technology and method innovation in off-site construction: conceptual frameworks","year":2021,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Benchmarking; Maturity (psychological); Scope (computer science); Context (archaeology); Capability Maturity Model; Conceptual framework; Process management; Technology roadmap; Knowledge management; Computer science; Systems engineering; Engineering; Business; Marketing; Geography","score_opus":0.00559397306745559,"score_gpt":0.22390091633950168,"score_spread":0.21830694327204608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186607705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6597995,0.00041739564,0.3373032,0.001198207,0.0007721842,0.00010129104,0.000008084755,0.000086543485,0.00031359185],"genre_scores_gemma":[0.76196885,0.0001703317,0.23776478,0.00004719509,0.000025318912,0.000006122859,0.000010165224,0.0000061732662,0.0000010925803],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99804914,0.00004004228,0.001504318,0.00008993786,0.00016708474,0.000149463],"domain_scores_gemma":[0.99834067,0.00005858859,0.0006785566,0.0001433521,0.0007590826,0.000019739262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040454653,0.00014161917,0.00035651322,0.005481416,0.00003859523,0.000027340244,0.000094067116,0.0009135108,0.00003532142],"category_scores_gemma":[0.0003393091,0.0001556387,0.000039208564,0.004280914,0.00043367338,0.00092134596,0.000023006103,0.0012127325,0.000001662003],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035329344,0.000015966245,0.04485434,0.000092535236,0.000037589663,0.000007347956,0.00040191264,0.0037989526,0.009454235,0.28048182,0.000030880365,0.6607891],"study_design_scores_gemma":[0.008404269,0.0003357233,0.014587021,0.0021479677,0.00008003573,0.013696595,0.06684637,0.0686749,0.5834196,0.22807477,0.0128033655,0.00092936814],"about_ca_topic_score_codex":0.0000018950345,"about_ca_topic_score_gemma":0.0000070367214,"teacher_disagreement_score":0.6598597,"about_ca_system_score_codex":0.0001530002,"about_ca_system_score_gemma":0.00016225314,"threshold_uncertainty_score":0.70458317},"labels":[],"label_agreement":null},{"id":"W3189873253","doi":"10.29173/ijic249","title":"Overview of the Characteristics of the Modular Industry and Barriers to its Increased Market Share","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Context (archaeology); Work (physics); Engineering; Construction management; Business; Engineering management; Operations management; Civil engineering; Marketing; Computer science","score_opus":0.0198415928146441,"score_gpt":0.24666073306717726,"score_spread":0.22681914025253316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3189873253","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9926932,0.00024494817,0.00019595632,0.00080861547,0.0052638967,0.000106448424,0.00016370411,0.00000740375,0.0005158652],"genre_scores_gemma":[0.9991577,0.00012200345,0.00024580976,0.0000840207,0.00032462683,0.0000024673807,0.0000026547343,0.000009294813,0.000051376457],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986451,0.00013029038,0.0006494723,0.000078033445,0.00042402695,0.00007306746],"domain_scores_gemma":[0.9983926,0.000051217237,0.0004432389,0.00013632275,0.0008919655,0.00008470312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023113293,0.000103620056,0.00022163204,0.00010945515,0.0000427611,0.000038327715,0.00026236987,0.00021558332,0.00060358533],"category_scores_gemma":[0.0009563626,0.0000731929,0.00013485095,0.0002833069,0.00008787813,0.00015661608,0.00006169877,0.0004712822,3.1787815e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012433982,0.00010602455,0.24056384,0.00027134828,0.0031368546,0.00003421942,0.0011142762,0.0027776773,0.3112672,0.03227862,0.009944753,0.3972618],"study_design_scores_gemma":[0.008383782,0.00012920405,0.25191128,0.004594459,0.0006097397,0.0046172007,0.0036643352,0.0046822033,0.6713302,0.0028978076,0.046523735,0.0006560547],"about_ca_topic_score_codex":0.000011389431,"about_ca_topic_score_gemma":0.0000042035194,"teacher_disagreement_score":0.39660573,"about_ca_system_score_codex":0.0000895951,"about_ca_system_score_gemma":0.00031160444,"threshold_uncertainty_score":0.6608836},"labels":[],"label_agreement":null},{"id":"W3191066931","doi":"10.1061/(asce)la.1943-4170.0000489","title":"Ontology for Linking Delay Claims with 4D Simulation to Analyze Effects-Causes and Responsibilities","year":2021,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Computer science; GRASP; Causality (physics); Negotiation; Workbench; Taxonomy (biology); Multidisciplinary approach; Liability; Risk analysis (engineering); Knowledge management; Data mining; Visualization; Software engineering; Law; Accounting; Business","score_opus":0.004404616675288333,"score_gpt":0.21025981862314624,"score_spread":0.20585520194785792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191066931","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6913788,0.0015013157,0.3065626,0.00009551653,0.0003219156,0.00007576506,0.0000030169524,0.00002515936,0.00003595886],"genre_scores_gemma":[0.9779611,0.00020614911,0.021679398,0.000007693845,0.0001159094,0.0000075346857,0.00000222311,0.000010819152,0.000009141527],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993396,0.000024457302,0.00029179666,0.00012519136,0.00008857094,0.00013039273],"domain_scores_gemma":[0.9995131,0.00016873068,0.00005609286,0.00005159018,0.00013331922,0.00007714833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015576207,0.0001181247,0.00020954173,0.0002509281,0.00007020903,0.00009169067,0.000018446433,0.000089726134,0.0000010608863],"category_scores_gemma":[0.000060592996,0.000106784755,0.000030014491,0.00016573087,0.000053660387,0.00028274226,0.000008994699,0.0001553955,4.6524864e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041987954,0.00001743962,0.007129052,0.0005871218,0.00013390412,0.00003166202,0.00061970914,0.8611717,0.0071181017,0.050933234,0.000015142749,0.07182305],"study_design_scores_gemma":[0.0021154054,0.00054152537,0.017300379,0.0008988719,0.0001381258,0.0029178236,0.0023757308,0.96504045,0.0026230086,0.0015583616,0.0040843906,0.00040593825],"about_ca_topic_score_codex":0.0000063348634,"about_ca_topic_score_gemma":0.00006483119,"teacher_disagreement_score":0.28658238,"about_ca_system_score_codex":0.00005428946,"about_ca_system_score_gemma":0.000037485195,"threshold_uncertainty_score":0.43545562},"labels":[],"label_agreement":null},{"id":"W3191965077","doi":"10.1139/cjce-2020-0790","title":"Modeling earthmoving operations in real time using hybrid fuzzy simulation","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Probabilistic logic; System dynamics; Industrial engineering; Engineering; Truck; Dynamism; Computer science; Operations research; Simulation; Artificial intelligence","score_opus":0.011699611184720786,"score_gpt":0.1996708265390634,"score_spread":0.1879712153543426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191965077","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77214795,0.000568522,0.22517326,0.000021562246,0.0006903487,0.000036285626,0.000007034451,0.00003455165,0.0013204864],"genre_scores_gemma":[0.9976173,0.000020213005,0.002117252,0.0000067461947,0.00019268537,6.728023e-7,0.000004555167,0.000024674731,0.000015868307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992921,0.000012165073,0.00034564457,0.000067320696,0.000088354645,0.0001944201],"domain_scores_gemma":[0.9995515,0.000018160476,0.000016523762,0.00007770677,0.0001519589,0.00018415596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011581511,0.00009860216,0.00014597675,0.0003740738,0.000049651106,0.00008186639,0.000056120723,0.000051193838,0.000125908],"category_scores_gemma":[0.00006556514,0.00012076681,0.00005383847,0.00023689235,0.0000062635518,0.00036799704,0.000003056518,0.00022436939,0.0000037418624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.9190953e-7,0.0000010010309,0.00011480009,0.000010815662,0.000012828454,0.00006643866,0.0001228212,0.98974067,0.009170253,0.00018442977,0.000009438579,0.00056601886],"study_design_scores_gemma":[0.00013458806,0.0000043175114,0.00012579183,0.00013445033,0.000009822945,0.0002074478,0.000051506566,0.9984261,0.0005763382,0.000053398973,0.0001616467,0.000114604976],"about_ca_topic_score_codex":0.00053939805,"about_ca_topic_score_gemma":0.053725183,"teacher_disagreement_score":0.2254694,"about_ca_system_score_codex":0.00026910953,"about_ca_system_score_gemma":0.00037354373,"threshold_uncertainty_score":0.96354187},"labels":[],"label_agreement":null},{"id":"W3192315988","doi":"10.29173/ijic252","title":"Construction stakeholders’ perceived benefits and barriers for environment-friendly modular construction in a hospitality centric environment","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Business; Sustainability; Hospitality; Process management; Documentation; Quality (philosophy); Marketing; Operations management; Engineering management; Engineering; Tourism; Computer science","score_opus":0.022736039882881972,"score_gpt":0.216109268364984,"score_spread":0.19337322848210203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3192315988","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96427774,0.00080390327,0.027485648,0.00049919053,0.006198943,0.000333506,0.00014668173,0.000045116583,0.00020927716],"genre_scores_gemma":[0.96854377,0.0026661488,0.027909288,0.000029931278,0.00070126023,0.000031648673,0.000067700064,0.00003501358,0.000015264248],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9977146,0.00012459353,0.0010660888,0.00031013068,0.0005312281,0.00025339655],"domain_scores_gemma":[0.99881315,0.00008432874,0.00045005666,0.00015800669,0.00030945768,0.0001849821],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033781448,0.00027158114,0.00039900304,0.00047284862,0.00010188151,0.00015140326,0.00016079757,0.00033118526,0.000329185],"category_scores_gemma":[0.00020494808,0.0003001801,0.00018348866,0.00018274624,0.00030877237,0.0006700749,0.000031995776,0.00045337676,0.0000024137257],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006927287,0.00008015706,0.03059403,0.000037607966,0.0008252169,0.000054053467,0.00051985343,0.029214084,0.020311838,0.024592336,0.00023573074,0.89284235],"study_design_scores_gemma":[0.14870253,0.002707848,0.10184008,0.0033375728,0.0027614497,0.054661885,0.13664421,0.080075674,0.22381943,0.07921318,0.15845303,0.0077830884],"about_ca_topic_score_codex":0.000015644473,"about_ca_topic_score_gemma":0.0000060097595,"teacher_disagreement_score":0.8850593,"about_ca_system_score_codex":0.00064729655,"about_ca_system_score_gemma":0.00018323457,"threshold_uncertainty_score":0.99994504},"labels":[],"label_agreement":null},{"id":"W3196414549","doi":"","title":"Building Information Modeling (BIM) 'Best practices' project report: An investigation of 'best practices' through case studies at regional, national, and international levels","year":2011,"lang":"en","type":"article","venue":"QUT ePrints (Queensland University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Integrated project delivery; Best practice; Process management; Work (physics); Scope (computer science); Business; Project team; Process (computing); Real estate; Project management; Knowledge management; Engineering; Operations management; Computer science; Systems engineering; Finance","score_opus":0.17419984135298358,"score_gpt":0.32488009276158203,"score_spread":0.15068025140859845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196414549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9868052,0.00010746272,0.00917543,0.00038810153,0.00016838404,0.0001866792,0.000021838032,0.00013333408,0.0030135866],"genre_scores_gemma":[0.95206195,0.0004815846,0.047283832,0.000009837944,0.000020504449,0.0000022378779,0.000018568297,0.0000071857494,0.00011428681],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991841,0.000026355629,0.00031745408,0.0001888044,0.00018362493,0.000099683544],"domain_scores_gemma":[0.9981655,0.000039561543,0.0008854476,0.00018568529,0.00069737656,0.000026423668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025304226,0.00012632103,0.00017055348,0.00042502512,0.00014369213,0.000012185742,0.00014734759,0.00019747023,0.000028773824],"category_scores_gemma":[0.00028973827,0.00014026521,0.000031961772,0.0002560526,0.00023556768,0.0020449942,0.00010025928,0.00019426527,0.000006386908],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016863054,0.0009863488,0.24108984,0.0030058445,0.006166488,0.0020181201,0.092731655,0.022211742,0.040810667,0.42564112,0.006770129,0.15688172],"study_design_scores_gemma":[0.008088103,0.0011773764,0.009431512,0.0019354349,0.0014414376,0.040608652,0.25678656,0.42197096,0.053327825,0.10825698,0.09386675,0.003108382],"about_ca_topic_score_codex":0.00088744954,"about_ca_topic_score_gemma":0.0003807243,"teacher_disagreement_score":0.39975923,"about_ca_system_score_codex":0.00013144489,"about_ca_system_score_gemma":0.000076146054,"threshold_uncertainty_score":0.57198495},"labels":[],"label_agreement":null},{"id":"W3196481044","doi":"10.1007/978-981-19-0968-9_2","title":"A Faceted Classification System for Innovation in the Construction Industry","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Scope (computer science); Conceptualization; Knowledge management; Class (philosophy); Computer science; Scale (ratio); Management science; Data science; Process management; Engineering; Business; Artificial intelligence; Geography","score_opus":0.01757988222757798,"score_gpt":0.20914848622635246,"score_spread":0.19156860399877448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196481044","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005900777,0.0015043193,0.8697971,0.0005397866,0.0072440784,0.0031567349,0.00023471509,0.0014556345,0.11016683],"genre_scores_gemma":[0.99774724,0.000032036514,0.0009641661,0.0000297819,0.00031822335,0.00043473893,0.00026506282,0.00008958124,0.000119163305],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876255,0.000013615266,0.00056672725,0.00024789368,0.00020958125,0.00019963947],"domain_scores_gemma":[0.9993832,0.00018221421,0.000111312635,0.00024891176,0.000059531834,0.000014824189],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002610523,0.0003024267,0.00025961627,0.00074580614,0.000054208296,0.000048451184,0.00016705856,0.0007444337,0.00008950941],"category_scores_gemma":[0.0000821966,0.0002937171,0.00006327841,0.00042729639,0.000022109636,0.000105716936,0.000012477448,0.0016065481,0.0000023869939],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012878569,0.000004708973,0.0000737632,0.00056250056,0.000045787885,0.0000032769585,0.00041816806,0.56067955,0.0024235046,0.40198043,0.000065636625,0.033729788],"study_design_scores_gemma":[0.0016360666,0.000108082364,0.00080562284,0.001583954,0.00012384949,0.0002919084,0.00049871684,0.82633364,0.002090602,0.012984148,0.15175554,0.0017878795],"about_ca_topic_score_codex":0.000007643411,"about_ca_topic_score_gemma":0.00013630523,"teacher_disagreement_score":0.99184644,"about_ca_system_score_codex":0.00063334306,"about_ca_system_score_gemma":0.000038328668,"threshold_uncertainty_score":0.9999515},"labels":[],"label_agreement":null},{"id":"W3196605555","doi":"10.3390/su131810060","title":"Simulation-Based Approach for Lookahead Scheduling of Onshore Wind Projects Subject to Weather Risk","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Scheduling (production processes); Wind speed; Computer science; Environmental science; Decision support system; Operations research; Meteorology; Engineering; Operations management; Data mining; Geography","score_opus":0.012776686077661947,"score_gpt":0.2577541714799061,"score_spread":0.24497748540224415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196605555","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50524765,0.000056609228,0.4936096,0.000041934833,0.00007133365,0.0005360319,0.00002045141,0.00007802107,0.00033838395],"genre_scores_gemma":[0.9781219,4.5209026e-7,0.021639576,0.000011717093,0.00005095263,0.00007282279,0.000024440349,0.000018181385,0.00005999283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992018,0.000054300504,0.00023108302,0.00022215974,0.00010999255,0.00018067592],"domain_scores_gemma":[0.9984543,0.00024855032,0.000033525885,0.00028173206,0.00093116384,0.000050736064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002639737,0.000113248025,0.00016166712,0.000073441326,0.000067618,0.00002092966,0.00005748725,0.000093219336,0.000024517447],"category_scores_gemma":[0.0015534374,0.00011341102,0.0000990316,0.00033103925,0.000039276125,0.00006654708,0.000010063172,0.00011190256,7.093103e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037841368,0.00004621347,0.03154837,0.00043104574,0.000018700199,3.5063667e-7,0.00037149037,0.9578517,0.00018558948,0.0010647674,0.000007832288,0.008436067],"study_design_scores_gemma":[0.00040362778,0.000052036623,0.005357603,0.000014421405,0.000032464137,5.3758845e-7,0.0023967072,0.9767171,0.011789172,0.0026456343,0.0004209968,0.0001697042],"about_ca_topic_score_codex":0.00003094015,"about_ca_topic_score_gemma":0.000020396998,"teacher_disagreement_score":0.47287422,"about_ca_system_score_codex":0.00029029112,"about_ca_system_score_gemma":0.0003611731,"threshold_uncertainty_score":0.46247673},"labels":[],"label_agreement":null},{"id":"W3196745607","doi":"","title":"Framework to establish the relationship between factors influencing construction productivity using fuzzy interpretive structural modeling","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Fuzzy logic; Fuzzy set; Computer science; Management science; Risk analysis (engineering); Business; Engineering; Economics; Artificial intelligence; Economic growth","score_opus":0.03002855157534349,"score_gpt":0.2626140417166365,"score_spread":0.232585490141293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196745607","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8240869,0.000015573436,0.17303072,0.00004799155,0.0011590426,0.00030306645,0.0000082484385,0.00025078232,0.0010976531],"genre_scores_gemma":[0.99059093,3.4080463e-7,0.00911118,0.000018973125,0.00021892262,0.0000073361334,0.000005453788,0.000025068222,0.000021808275],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990037,0.00005082663,0.00028746814,0.00024751527,0.00019147753,0.00021898892],"domain_scores_gemma":[0.99919796,0.00028965386,0.000045923727,0.00028978518,0.00011013344,0.000066537934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001403867,0.00018858674,0.00016945995,0.00014923142,0.00018906237,0.00014311627,0.00013724918,0.00015061641,0.00007341184],"category_scores_gemma":[0.00031647342,0.00014112354,0.00006029991,0.00045587376,0.00004390697,0.00068563677,0.000036075806,0.0005130047,0.000024505838],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057891284,8.241317e-7,0.7256834,0.000018953615,0.000028539678,5.134566e-8,0.0027799269,0.24664208,0.0010118764,0.022048663,0.0000059715717,0.0017739541],"study_design_scores_gemma":[0.00021470796,0.0000632972,0.37731722,0.0004984692,0.00011084341,0.000036885944,0.020614997,0.5256293,0.006200323,0.06820916,0.000062947955,0.0010418806],"about_ca_topic_score_codex":0.0001449616,"about_ca_topic_score_gemma":0.000025815161,"teacher_disagreement_score":0.34836614,"about_ca_system_score_codex":0.00023429382,"about_ca_system_score_gemma":0.00003536067,"threshold_uncertainty_score":0.5754851},"labels":[],"label_agreement":null},{"id":"W3197063582","doi":"10.29173/mocs146","title":"A Study on Freeform Optimization using BIM Technology","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Construction engineering; Visualization; Computer science; Process (computing); Quality (philosophy); Engineering; Systems engineering; Risk analysis (engineering); Mechanical engineering","score_opus":0.021864561917337523,"score_gpt":0.22342238909860235,"score_spread":0.20155782718126483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197063582","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95740104,0.00016613147,0.03809547,0.00007241806,0.0008293009,0.00038090802,0.000005668705,0.00062114367,0.002427943],"genre_scores_gemma":[0.98717576,0.000025679728,0.01249703,0.000022173492,0.00016198361,0.000033790267,0.000006896342,0.00003623662,0.00004046294],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988685,0.0000071276672,0.00031789712,0.0003297094,0.00024060985,0.00023613534],"domain_scores_gemma":[0.9993538,0.0000048767847,0.000081320024,0.00012391312,0.00030998644,0.00012609981],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014261973,0.00024866915,0.00023672683,0.00057291146,0.0001707876,0.00013679791,0.00009675123,0.00021944738,0.000018834378],"category_scores_gemma":[0.000031265306,0.00024534875,0.0000408792,0.0006459244,0.00014122223,0.000501583,0.000033110107,0.00025678298,0.0000108853355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028171903,0.00037477736,0.4695752,0.00023086237,0.00059275463,0.000027967617,0.0035016167,0.15184888,0.009563359,0.07592923,0.0012303903,0.28684324],"study_design_scores_gemma":[0.0054031317,0.0011599986,0.0037537655,0.00024322886,0.0003248193,0.00089228514,0.052283507,0.90276927,0.01623737,0.0064541698,0.008811143,0.0016673285],"about_ca_topic_score_codex":0.000016545053,"about_ca_topic_score_gemma":0.000008869754,"teacher_disagreement_score":0.75092036,"about_ca_system_score_codex":0.00015163401,"about_ca_system_score_gemma":0.000026196652,"threshold_uncertainty_score":0.9999999},"labels":[],"label_agreement":null},{"id":"W3197450189","doi":"10.1007/978-981-19-1029-6_11","title":"Applying ISO 19650 Guidelines on Digital Deliverables Intended for BIM-Centric Facility Management (FM) in Quebec’s Context","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Facility management; Deliverable; Context (archaeology); Digitization; Process management; Work (physics); Process (computing); Knowledge management; Project management; Information management; Engineering; Engineering management; Business; Systems engineering; Computer science; Operations management","score_opus":0.016097323374345985,"score_gpt":0.2109582346142138,"score_spread":0.19486091123986782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197450189","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00081073266,0.0074733235,0.9385578,0.00023069255,0.0040664105,0.0036939192,0.0007225046,0.0011321416,0.043312486],"genre_scores_gemma":[0.9882704,0.0010072279,0.0027636979,0.00027828303,0.00048163836,0.0014380487,0.0008423588,0.00029559887,0.004622741],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981062,0.0000076003284,0.0007182588,0.00048972364,0.00027676477,0.0004014678],"domain_scores_gemma":[0.9992369,0.00023947611,0.000074432806,0.00031807064,0.00007251616,0.000058620237],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015892825,0.000575111,0.0005122464,0.0008240957,0.0000609008,0.0001068899,0.00023831245,0.00032795087,0.00029704924],"category_scores_gemma":[0.00014311315,0.0006263247,0.00019677421,0.00017655759,0.00002189827,0.00017284826,0.000067112946,0.00095240294,0.000013201036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028848464,0.000009834278,0.00002517243,0.00039930013,0.00008888701,0.00001743978,0.00010158089,0.61207163,0.000035441306,0.012340663,0.00014966179,0.37473154],"study_design_scores_gemma":[0.0014962666,0.00007843003,0.000031067968,0.0011304136,0.00006662918,0.00002005391,0.00009012546,0.31307453,0.0003803548,0.006764253,0.67533576,0.0015320973],"about_ca_topic_score_codex":0.00026934638,"about_ca_topic_score_gemma":0.00701022,"teacher_disagreement_score":0.98745966,"about_ca_system_score_codex":0.00087096635,"about_ca_system_score_gemma":0.000024474459,"threshold_uncertainty_score":0.9996188},"labels":[],"label_agreement":null},{"id":"W3197682149","doi":"10.17762/de.vi.3550","title":"Factors Affecting Selection of Excavation Support System","year":2021,"lang":"en","type":"article","venue":"Design Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Selection (genetic algorithm); Decision support system; Excavation; Risk analysis (engineering); Set (abstract data type); Process (computing); Computer science; Operations research; Engineering; Business; Data mining; Artificial intelligence","score_opus":0.01653442342973657,"score_gpt":0.18882005645369646,"score_spread":0.17228563302395988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197682149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32831898,0.000036791876,0.670155,9.832205e-7,0.0005533921,0.000053653515,0.0000013726861,0.0004288536,0.0004509681],"genre_scores_gemma":[0.9950436,0.000003817884,0.004817532,8.179537e-7,0.000065941866,0.0000065514328,0.000010983392,0.00002370822,0.000027073253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99949515,0.000013832276,0.00018860289,0.00009074964,0.00009521943,0.00011646839],"domain_scores_gemma":[0.9997512,0.000048202604,0.000025682559,0.000072471485,0.00007384518,0.000028592254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008932976,0.00010356007,0.00012345091,0.00010203185,0.000025117568,0.000017802613,0.00003011051,0.00007072256,0.000041221585],"category_scores_gemma":[0.000028301605,0.000111063135,0.000043108776,0.00029970007,0.0000036854913,0.00013456705,0.000004083726,0.000093869785,0.000004049282],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015050472,0.0000046064642,0.0013994788,0.00028564906,0.00004818748,0.000001979697,0.00027292545,0.532547,0.46053857,0.0022890104,0.0001024225,0.0025086368],"study_design_scores_gemma":[0.0000782023,0.000013473498,0.0032819335,0.000054048513,0.000013978576,0.00002566679,0.0002549831,0.29593655,0.70013475,0.000003935731,0.00009371033,0.000108743465],"about_ca_topic_score_codex":0.000002782334,"about_ca_topic_score_gemma":0.0000013264892,"teacher_disagreement_score":0.6667246,"about_ca_system_score_codex":0.00009679555,"about_ca_system_score_gemma":0.000018379222,"threshold_uncertainty_score":0.45290232},"labels":[],"label_agreement":null},{"id":"W3197803345","doi":"10.5539/eer.v11n2p31","title":"A Review of Embedding Artificial Intelligence in Internet of Things and Building Information Modelling for Healthcare Facility Maintenance Management","year":2021,"lang":"en","type":"review","venue":"Energy and Environment Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Monash University","keywords":"Computer science; Facility management; Process (computing); Exploit; Internet of Things; Health care; Engineering management; Knowledge management; Data science; Process management; Systems engineering; Risk analysis (engineering); World Wide Web; Computer security; Business; Engineering","score_opus":0.07520946588291194,"score_gpt":0.3386164137042602,"score_spread":0.26340694782134827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197803345","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000007804224,0.70914704,0.29048035,0.000014397181,0.000028288281,0.0002224199,0.000010007866,0.0000042515358,0.0000854624],"genre_scores_gemma":[0.00053452293,0.9951082,0.0040943827,0.0000074958757,0.000007500152,0.00015607744,0.000065434986,0.000006393057,0.00002000042],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987624,0.00008869563,0.0006392305,0.00016514651,0.00017746622,0.00016705535],"domain_scores_gemma":[0.9996274,0.000089397065,0.00008787852,0.00013168392,0.000029593064,0.000034042278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008574204,0.0001288569,0.00048523414,0.00021203763,0.000028167271,0.000016048778,0.00008215397,0.00010770053,0.000015227183],"category_scores_gemma":[0.000018216246,0.00011729644,0.00006726571,0.00015197304,0.000075904056,0.00015955533,0.00008147543,0.00020545517,3.7203262e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002632655,0.0000047135527,3.5977104e-7,0.07545837,0.000021828519,2.872902e-7,0.00009329455,0.0011938097,4.4241773e-7,0.026794953,0.000023122908,0.8964062],"study_design_scores_gemma":[0.000044366403,0.00004112921,3.0919617e-7,0.09871,0.00004344632,0.0000071455843,0.00030957,0.13023663,0.00006872505,0.0024716756,0.76788336,0.00018365646],"about_ca_topic_score_codex":0.000076277975,"about_ca_topic_score_gemma":0.0000034896373,"teacher_disagreement_score":0.89622253,"about_ca_system_score_codex":0.00011470567,"about_ca_system_score_gemma":0.00001575782,"threshold_uncertainty_score":0.47832102},"labels":[],"label_agreement":null},{"id":"W3198401240","doi":"10.1088/1757-899x/1218/1/012052","title":"BIM and Lean for value generation in the built asset industry: an information management perspective","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Operationalization; Asset (computer security); Productivity; Perspective (graphical); Asset management; Popularity; Business; Knowledge management; Process management; Lean manufacturing; Building information modeling; Work (physics); Computer science; Risk analysis (engineering); Industrial organization; Engineering; Operations management; Marketing; Economics; Finance; Computer security","score_opus":0.018602877532650854,"score_gpt":0.22722332359120698,"score_spread":0.20862044605855612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3198401240","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99451756,0.000020178564,0.004203867,0.00018211956,0.0004324667,0.00025283036,0.00002888247,0.00005594705,0.00030613627],"genre_scores_gemma":[0.9987033,0.000031443073,0.0009674408,0.000042120144,0.000045890123,0.00018158274,0.000019418654,0.000004436456,0.000004378728],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943906,0.000010656444,0.00013500206,0.00011085288,0.00016146766,0.00014297263],"domain_scores_gemma":[0.9997988,0.000006044742,0.000020317058,0.00008755325,0.000060582788,0.000026721162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005060048,0.00008513095,0.00007264549,0.00015725868,0.00022667607,0.00034846348,0.00012046251,0.000031387408,0.000018054285],"category_scores_gemma":[0.000016886916,0.00007539595,0.0000050008593,0.00023028305,0.00006130418,0.00127123,0.000036210684,0.00009230708,3.0894148e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014088298,0.0000067472993,0.000026419431,0.000075272466,0.000007303441,8.59912e-7,0.005151472,0.04639566,0.19404295,0.7461224,0.000059850172,0.008096934],"study_design_scores_gemma":[0.0012135354,0.00063038536,0.018162562,0.00006673027,0.000047767902,0.000244569,0.11442611,0.66128397,0.17691086,0.010721375,0.015185376,0.0011067855],"about_ca_topic_score_codex":0.000041867683,"about_ca_topic_score_gemma":0.000013782436,"teacher_disagreement_score":0.7354011,"about_ca_system_score_codex":0.00007772307,"about_ca_system_score_gemma":0.000025262447,"threshold_uncertainty_score":0.33602414},"labels":[],"label_agreement":null},{"id":"W3199586433","doi":"10.1007/s11356-021-16285-0","title":"RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates","year":2021,"lang":"en","type":"article","venue":"Environmental Science and Pollution Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":72,"is_retracted":true,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Tardiness; Metaheuristic; Computer science; Scheduling (production processes); Differential evolution; Mathematical optimization; Job shop scheduling; Industrial engineering; Engineering; Algorithm; Schedule; Mathematics","score_opus":0.03915713156073838,"score_gpt":0.2773286640349963,"score_spread":0.2381715324742579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3199586433","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99841607,0.00038460895,0.00021015605,0.00019598608,0.00025852234,0.00013244091,0.000015780019,0.000044682416,0.00034177952],"genre_scores_gemma":[0.99853355,0.00042336332,0.000921003,0.000008085486,0.000038321985,0.000008574632,0.0000146399325,0.000006041495,0.00004639693],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99849087,0.000073741634,0.00021527229,0.0002754891,0.0006933616,0.00025127342],"domain_scores_gemma":[0.9995969,0.000019160423,0.000036010977,0.00016142585,0.0000922336,0.00009426626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073420396,0.00007895678,0.00009119025,0.00017400365,0.00034047183,0.000066878354,0.00007387381,0.00006838322,0.00010755857],"category_scores_gemma":[0.00012579995,0.000081475424,0.000014411619,0.0006564493,0.0011096796,0.00053763465,0.00006635054,0.00029732528,0.000020544325],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007200549,0.000019722047,0.006658225,0.000013497962,0.0000062333174,0.0000027736316,0.00015200823,0.0012662521,0.9623213,0.00032714842,0.000009675802,0.029216008],"study_design_scores_gemma":[0.00015470269,0.000020700194,0.08440367,0.000041521937,0.0000052853975,0.00021732226,0.001064152,0.025214545,0.88836807,0.00017303348,0.0002388948,0.00009809554],"about_ca_topic_score_codex":0.000032152253,"about_ca_topic_score_gemma":0.000011585675,"teacher_disagreement_score":0.077745445,"about_ca_system_score_codex":0.00023348202,"about_ca_system_score_gemma":0.00006960743,"threshold_uncertainty_score":0.40886608},"labels":[],"label_agreement":null},{"id":"W3200509981","doi":"","title":"Proceedings of the Thirtieth International Conference on Automated Planning and Scheduling, Nancy, France, October 26-30, 2020.","year":2020,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scheduling (production processes); Computer science; Operations research; History; Library science; Engineering; Operations management","score_opus":0.013159162006999903,"score_gpt":0.2242178395830673,"score_spread":0.2110586775760674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200509981","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7111133,0.0019643586,0.021427928,0.012343487,0.0021992081,0.0008497521,0.00013931985,0.0022835801,0.24767907],"genre_scores_gemma":[0.9915491,0.00036674613,0.0071319337,0.00005826137,0.000032785032,0.000036951053,0.00003711773,0.000033867163,0.000753286],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998683,0.0001737185,0.0003643769,0.000343871,0.000297544,0.00013750792],"domain_scores_gemma":[0.99818456,0.00010906233,0.00026399462,0.0003436912,0.001031174,0.0000675316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056722533,0.0002187014,0.0002204528,0.00007028025,0.00012145201,0.00020842125,0.00060065364,0.00021810035,0.00009688886],"category_scores_gemma":[0.00025995343,0.00019526869,0.00008650838,0.00019209429,0.0001608387,0.00009574482,0.00035871414,0.00066759204,0.000010380602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004871503,0.00029718378,0.035806105,0.0012575622,0.0006383262,0.0000034235231,0.031791106,0.006274445,0.05247104,0.80274135,0.011988719,0.056682035],"study_design_scores_gemma":[0.0005108885,7.479381e-7,0.017721185,0.0051500658,0.00004550476,0.000009619094,0.0004018336,0.8970502,0.0653893,0.006062377,0.0072131245,0.00044513977],"about_ca_topic_score_codex":0.000051558713,"about_ca_topic_score_gemma":0.000018551933,"teacher_disagreement_score":0.89077574,"about_ca_system_score_codex":0.00004393461,"about_ca_system_score_gemma":0.00007509228,"threshold_uncertainty_score":0.7962826},"labels":[],"label_agreement":null},{"id":"W3201902753","doi":"10.3390/buildings11100456","title":"Framing and Evaluating the Best Practices of IFC-Based Automated Rule Checking: A Case Study","year":2021,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"National Natural Science Foundation of China","keywords":"Computer science; Framing (construction); Rule-based system; Software engineering; Systems engineering; Engineering; Artificial intelligence","score_opus":0.04849163021983045,"score_gpt":0.34372690978734505,"score_spread":0.2952352795675146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201902753","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9979723,0.0004317086,0.0007285111,0.00006280128,0.00014134256,0.00012207967,0.0000014270156,0.0001874133,0.0003523972],"genre_scores_gemma":[0.99626356,0.00000493046,0.0036289047,0.000017138598,0.00003196935,0.00001841109,0.0000011520668,0.000011636742,0.000022310573],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944985,0.000046866207,0.00017600994,0.00011390551,0.00012848945,0.00008486547],"domain_scores_gemma":[0.99948335,0.00014292778,0.00011222957,0.00012433458,0.00011640884,0.00002072387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024027383,0.00007705362,0.000094432224,0.0000377285,0.00011144968,0.000071231705,0.0000406525,0.000038951242,0.000022554197],"category_scores_gemma":[0.00026029386,0.0000624199,0.00002095335,0.00019739366,0.000027454438,0.00011473503,0.000017303511,0.00011749929,0.0000013775561],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003816566,0.00039180435,0.06826884,0.00054681057,0.00042474133,0.0007340731,0.015963577,0.024628423,0.59941506,0.0011613133,0.0002582698,0.28816894],"study_design_scores_gemma":[0.00073587766,0.00015505448,0.0020070232,0.00011788823,0.0001790626,0.0013647914,0.040407896,0.8994521,0.054701127,0.00005867371,0.0006270862,0.00019344533],"about_ca_topic_score_codex":0.0003073323,"about_ca_topic_score_gemma":0.00007556923,"teacher_disagreement_score":0.87482363,"about_ca_system_score_codex":0.000018572784,"about_ca_system_score_gemma":0.00004340034,"threshold_uncertainty_score":0.25454098},"labels":[],"label_agreement":null},{"id":"W3202151048","doi":"10.1007/978-3-030-88207-5_11","title":"Integrating 4D Simulations and Virtual Reality Environments: An Innovative Prototype","year":2021,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Virtual reality; Human–computer interaction; Computer graphics (images)","score_opus":0.015445849310168557,"score_gpt":0.2409989838705758,"score_spread":0.22555313456040724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202151048","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00285004,0.00009201254,0.9948473,0.000040587533,0.00046543195,0.0002605681,0.0000134926695,0.00006663192,0.0013639204],"genre_scores_gemma":[0.96594304,0.000012630521,0.03354018,0.00011583589,0.000248895,0.000012002192,0.000044829067,0.00002371611,0.0000588893],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890727,0.000015450076,0.00026597508,0.00042168083,0.00023158397,0.00015804589],"domain_scores_gemma":[0.9994406,0.000080969716,0.00005953981,0.00027109406,0.00009718967,0.000050580777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001439456,0.00022174256,0.00018890451,0.00021035456,0.00014114875,0.00018918242,0.00017384086,0.0001812979,0.000038462433],"category_scores_gemma":[0.000042403077,0.00020928199,0.000018988598,0.00025814897,0.00040848498,0.00031194848,0.00007844252,0.00050111866,0.0000017906384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033265324,0.0000074849177,0.000110331566,0.000016485326,0.000011537813,0.0000045349216,0.0008016022,0.31561303,0.0017536739,0.034582004,8.2204224e-7,0.6470952],"study_design_scores_gemma":[0.00012220677,0.00012474816,0.00025680522,0.00021099087,0.000006019861,0.000022108477,0.0000027790736,0.9762006,0.0024470433,0.019200323,0.0010406558,0.00036574804],"about_ca_topic_score_codex":0.00001040509,"about_ca_topic_score_gemma":0.00030784425,"teacher_disagreement_score":0.963093,"about_ca_system_score_codex":0.0001674801,"about_ca_system_score_gemma":0.00010727804,"threshold_uncertainty_score":0.85342723},"labels":[],"label_agreement":null},{"id":"W3202501389","doi":"10.3390/logistics5040065","title":"Construction Site Layout Planning Using a Simulation-Based Decision Support Tool","year":2021,"lang":"en","type":"article","venue":"Logistics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Site planning; Site plan; Computer science; Page layout; Building information modeling; Engineering; Transport engineering; Construction engineering; Operations research; Urban planning; Regional planning; Civil engineering; Operations management","score_opus":0.03348528335128486,"score_gpt":0.2787379319780557,"score_spread":0.24525264862677082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202501389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13003017,0.00005098222,0.86738765,0.0000061771043,0.0010088162,0.00004082771,0.00002605375,0.00017723779,0.0012720937],"genre_scores_gemma":[0.9286031,0.0000022547488,0.07108786,0.00005532301,0.00013396966,0.0000019773006,0.000074648946,0.00001535685,0.000025511674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936014,0.00001375379,0.00023146556,0.00012830063,0.00013735829,0.0001289951],"domain_scores_gemma":[0.9994666,0.00017545046,0.000034998484,0.00014752263,0.00014095221,0.00003447154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000050455972,0.0001026527,0.00010815092,0.00006402547,0.00008395159,0.00006446448,0.000032798,0.00010742435,0.00024301582],"category_scores_gemma":[0.00017364309,0.000112040005,0.000041747597,0.00017482179,0.000041406016,0.000081699,0.000008688593,0.000121409576,0.000030205092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006809737,0.0000046172077,0.005351326,0.000015043576,0.000008194583,0.000018009872,0.00003827135,0.97507846,0.0013406287,0.0014440691,0.0000702358,0.016624356],"study_design_scores_gemma":[0.00022368898,0.000008797912,0.000584959,0.00003621797,0.000025511432,0.000026991986,0.00007837917,0.9932391,0.001802404,0.000977785,0.0028598395,0.00013634245],"about_ca_topic_score_codex":0.0000036255242,"about_ca_topic_score_gemma":0.000005613657,"teacher_disagreement_score":0.79857296,"about_ca_system_score_codex":0.00007563151,"about_ca_system_score_gemma":0.000070147405,"threshold_uncertainty_score":0.45688587},"labels":[],"label_agreement":null},{"id":"W3204087375","doi":"10.22215/etd/2020-14216","title":"Geometric Accuracy of BIM-BEM Transformation Workflows: Bridging the State-of-the-Art and Practice","year":2020,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Workflow; Bridging (networking); Transformation (genetics); Building information modeling; Computer science; Domain (mathematical analysis); Stakeholder; Data exchange; Software engineering; Systems engineering; Database; Engineering; Operations management; Scheduling (production processes)","score_opus":0.009769552308510792,"score_gpt":0.23546798153970733,"score_spread":0.22569842923119654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204087375","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53802997,0.006306038,0.24729079,0.0025033364,0.0057906886,0.0025546406,0.00009466309,0.0005220953,0.19690777],"genre_scores_gemma":[0.9974107,0.0010683653,0.00068519375,0.00004472477,0.000049343264,0.000023380266,0.000093243274,0.000025371872,0.00059966627],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99915457,0.000039780654,0.0004002998,0.000092605784,0.00022674365,0.00008598413],"domain_scores_gemma":[0.99920315,0.00029630994,0.00019929331,0.0001330702,0.0001450587,0.000023137778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012716938,0.00013866357,0.00016645108,0.00016022839,0.00005406213,0.000040924457,0.00011712878,0.00009035746,0.000041468586],"category_scores_gemma":[0.000276751,0.000091010574,0.000075559634,0.0007643219,0.000023639457,0.0003796362,0.0000048805123,0.0002683035,0.0000063595126],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012428251,0.000018008668,0.000077646895,0.0011525556,0.00025200608,3.3467174e-7,0.007142642,0.004377663,0.0033468765,0.005137598,0.0022793545,0.976091],"study_design_scores_gemma":[0.00253592,0.00029753815,0.036305435,0.0023574503,0.0019238865,0.00018557385,0.04649278,0.2504848,0.4471488,0.003784219,0.20636433,0.002119271],"about_ca_topic_score_codex":0.00003265784,"about_ca_topic_score_gemma":0.00008173146,"teacher_disagreement_score":0.9739718,"about_ca_system_score_codex":0.000021856938,"about_ca_system_score_gemma":0.000041055435,"threshold_uncertainty_score":0.37113035},"labels":[],"label_agreement":null},{"id":"W3205038720","doi":"10.54216/ijbes.010101","title":"An Exploratory Study of Building Information Modelling Maturity in the Construction Industry","year":2018,"lang":"en","type":"article","venue":"International Journal of BIM and Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Capability Maturity Model; Building information modeling; Context (archaeology); Service Integration Maturity Model; Process (computing); Construction industry; Process management; Engineering; Business; Operations management; Computer science; Construction engineering; Geography; Political science","score_opus":0.011538917329220843,"score_gpt":0.23970903006106595,"score_spread":0.2281701127318451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205038720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92627907,0.000020716012,0.07260787,0.000018117888,0.00097205554,0.000031666932,9.195118e-7,0.000010916998,0.000058666763],"genre_scores_gemma":[0.9970501,0.00001416487,0.0027746742,0.000008453653,0.00014891243,0.0000012276545,1.8180711e-7,0.000002166415,9.285864e-8],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999278,0.000009365224,0.00027548632,0.00004207539,0.00032858568,0.00006647881],"domain_scores_gemma":[0.99953735,0.000015727579,0.00007547385,0.000056971163,0.00028636045,0.000028088733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005156138,0.000052297488,0.000062398925,0.00039670194,0.000033278822,0.0000870577,0.00024506825,0.000038815182,0.0000026469472],"category_scores_gemma":[0.000023892493,0.000041033945,0.000011215441,0.00026342497,0.00008943934,0.0015668848,0.000009986876,0.00021261851,2.1249562e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003314521,0.00007194271,0.008770717,0.000019396188,0.00003392124,0.0000042784886,0.016022159,0.9154221,0.018187387,0.014183166,0.0000109146695,0.027240887],"study_design_scores_gemma":[0.00055002613,0.00025490567,0.017774075,0.000121203164,0.000010200882,0.00030362225,0.014946049,0.95718217,0.00786236,0.0006877,0.00017550995,0.00013218285],"about_ca_topic_score_codex":0.000006672414,"about_ca_topic_score_gemma":0.0000036051372,"teacher_disagreement_score":0.07077105,"about_ca_system_score_codex":0.000039716884,"about_ca_system_score_gemma":0.000027367512,"threshold_uncertainty_score":0.16733158},"labels":[],"label_agreement":null},{"id":"W3205073250","doi":"10.29173/mocs163","title":"Design and Specification Compilation of a Modularized Prefabricated High-rise Steel Frame Structure with Inclined Braces Part I: Integral Structural Design","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Structural engineering; Steel frame; Structural system; Displacement (psychology); Frame (networking); Finite element method; High rise; Engineering; Computer science; Mechanical engineering","score_opus":0.01893120030751462,"score_gpt":0.1994693870305877,"score_spread":0.1805381867230731,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205073250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7977585,0.0004669802,0.2003495,0.000072016344,0.00033109073,0.0006601701,0.000040725703,0.00026510603,0.000055892175],"genre_scores_gemma":[0.910953,0.00009208018,0.08863873,0.000012292979,0.00012822401,0.00003142022,0.00006641927,0.00004376112,0.000034062643],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982123,0.000059365557,0.0005861067,0.00048549188,0.000382463,0.00027428655],"domain_scores_gemma":[0.9986288,0.00004215611,0.0002951119,0.00016811227,0.0006658488,0.00019997219],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022049039,0.0004038346,0.00047349578,0.00033316264,0.00017183815,0.00019752546,0.00012860457,0.00030076568,0.00003439228],"category_scores_gemma":[0.000044475066,0.00034821493,0.0000392139,0.00051234453,0.00039799654,0.00094749505,0.00003349554,0.0003540447,0.0000016290182],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004781721,0.00011372154,0.117036685,0.0011033338,0.0011935245,0.000008784285,0.006943615,0.07166052,0.5091653,0.039876465,0.0014490566,0.24666731],"study_design_scores_gemma":[0.0059173056,0.00076089025,0.031159526,0.0003418401,0.0003608362,0.00038200882,0.0029935623,0.8137709,0.1295172,0.012514221,0.0009746541,0.001307089],"about_ca_topic_score_codex":0.000028175813,"about_ca_topic_score_gemma":0.000008674592,"teacher_disagreement_score":0.7421104,"about_ca_system_score_codex":0.00010073183,"about_ca_system_score_gemma":0.00005659401,"threshold_uncertainty_score":0.999897},"labels":[],"label_agreement":null},{"id":"W3206056695","doi":"10.32920/ryerson.14654898.v1","title":"The Use of Aerogel-Enhanced Blanket for Thermal Bridging Correction in Concrete and Steel Buildings","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Blanket; Aerogel; Thermal; Bridging (networking); Roof; Materials science; Structural engineering; Environmental science; Civil engineering; Computer science; Composite material; Engineering; Meteorology","score_opus":0.018379961113977418,"score_gpt":0.21968138277461793,"score_spread":0.20130142166064052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206056695","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8768225,0.00027151004,0.12050107,0.00002983786,0.0016534727,0.00027541717,0.000008705674,0.000076046126,0.00036144842],"genre_scores_gemma":[0.9968476,0.0002648134,0.0024624874,0.000014489484,0.00006346394,0.00008536957,0.000019161702,0.000017355991,0.00022524444],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993902,0.000020639296,0.00025536132,0.00015556623,0.00006730958,0.000110953864],"domain_scores_gemma":[0.99954474,0.00014666644,0.00006275702,0.00013977283,0.00008800705,0.000018041124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001014155,0.00012420295,0.00017185014,0.000052614636,0.00004067239,0.00012373968,0.00005368019,0.00014740114,0.000012660092],"category_scores_gemma":[0.000044464894,0.00010126529,0.00005663911,0.000058464226,0.000040344443,0.00009989905,0.000044297998,0.00022810508,1.903527e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013595498,0.0000055092637,0.0017932657,0.0005522909,0.00028232462,0.0000012221468,0.0018467276,0.12514177,0.31783563,0.0028399932,0.0018708103,0.5476945],"study_design_scores_gemma":[0.00044988032,0.000020846192,0.0022839375,0.00035739935,0.000036343557,0.000010623513,0.0008936458,0.7573809,0.23635662,0.00006703002,0.0018685964,0.000274159],"about_ca_topic_score_codex":0.00016233334,"about_ca_topic_score_gemma":0.00025737163,"teacher_disagreement_score":0.63223916,"about_ca_system_score_codex":0.000044918972,"about_ca_system_score_gemma":0.000029108518,"threshold_uncertainty_score":0.41294786},"labels":[],"label_agreement":null},{"id":"W3206345388","doi":"10.5267/j.ijiec.2021.7.001","title":"MILP of multitask scheduling of geographically distributed maintenance tasks","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Computer science; Scheduling (production processes); Solver; Integer programming; Operations research; Vehicle routing problem; Mathematical optimization; Routing (electronic design automation); Distributed computing; Engineering; Computer network; Mathematics","score_opus":0.013708939168181906,"score_gpt":0.2302422794096966,"score_spread":0.2165333402415147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206345388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41553676,0.00034114573,0.5800689,0.00027564052,0.0034433769,0.000053391635,0.00016194934,0.00004188322,0.00007695914],"genre_scores_gemma":[0.98546904,0.00006420195,0.014093699,0.0000074784193,0.00030669724,0.00000150693,0.000040662177,0.000013127708,0.000003584696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986974,0.000017845621,0.0007776814,0.000070828995,0.00033609176,0.000100137426],"domain_scores_gemma":[0.9981185,0.00015170108,0.00024156552,0.00007714929,0.0013515152,0.00005953707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013841003,0.00010667419,0.00023059921,0.00030177383,0.000015210225,0.000025127692,0.00020395097,0.00010804178,0.00003530203],"category_scores_gemma":[0.00039532388,0.000110994704,0.00017348511,0.00035970987,0.000039476185,0.00015941155,0.000021167292,0.000320943,8.086185e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001901753,0.000042334483,0.00083015393,0.000016162207,0.00036076552,0.000017967468,0.00005480975,0.9699752,0.016040476,0.0057727396,0.00020790155,0.0066625206],"study_design_scores_gemma":[0.0043228236,0.00014730034,0.006268613,0.0017697203,0.00016167646,0.00067367725,0.00040968173,0.89646846,0.08343426,0.0010789254,0.004834531,0.00043034757],"about_ca_topic_score_codex":0.000007627522,"about_ca_topic_score_gemma":0.000002147093,"teacher_disagreement_score":0.5699323,"about_ca_system_score_codex":0.00006559234,"about_ca_system_score_gemma":0.000120869125,"threshold_uncertainty_score":0.45262328},"labels":[],"label_agreement":null},{"id":"W3206861418","doi":"10.29173/mocs182","title":"Automation of Quantity Take-off for Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automation; Modular design; Computer science; Takeoff; Interface (matter); Process (computing); Purchasing; Building information modeling; Exploit; Modular programming; Industrial engineering; Software engineering; Database; Engineering drawing; Engineering; Operations management; Mechanical engineering; Operating system","score_opus":0.015974160699347744,"score_gpt":0.2132640815437478,"score_spread":0.19728992084440006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206861418","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.887682,0.00065886194,0.10744534,0.000077216675,0.0015814472,0.0005083361,0.00004926327,0.00043626293,0.0015612341],"genre_scores_gemma":[0.96079135,0.00015830596,0.038534414,0.000018311299,0.00025717073,0.00006938896,0.00005137076,0.000038990398,0.00008069052],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984373,0.000013310803,0.0005885041,0.00037029796,0.00031072006,0.00027989916],"domain_scores_gemma":[0.9986808,0.000019772788,0.0002117587,0.00014254352,0.00076704595,0.00017811109],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00030584095,0.00029352983,0.00038467697,0.0003436186,0.00016187722,0.00012120172,0.00010891508,0.0002822173,0.000030592088],"category_scores_gemma":[0.00008322676,0.00031372654,0.00012504583,0.000380455,0.00031609388,0.0009192132,0.00002412475,0.00018906272,0.000009517968],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003147102,0.00008527091,0.09671862,0.0012733857,0.00041253804,0.0000016143573,0.0013648729,0.0039471406,0.07633078,0.21495986,0.0049082316,0.599683],"study_design_scores_gemma":[0.0067902287,0.0006496034,0.015437748,0.00044182746,0.0005520879,0.000695978,0.0115983905,0.70600784,0.15396963,0.03172884,0.07013754,0.0019902554],"about_ca_topic_score_codex":0.000022452554,"about_ca_topic_score_gemma":0.000014660847,"teacher_disagreement_score":0.7020607,"about_ca_system_score_codex":0.00011502935,"about_ca_system_score_gemma":0.00004404377,"threshold_uncertainty_score":0.99993145},"labels":[],"label_agreement":null},{"id":"W3208380864","doi":"10.46421/sibragec.v11i00.33","title":"Sistema Last Planner X Advanced Work Packaging","year":2021,"lang":"en","type":"article","venue":"Simpósio Brasileiro de Gestão e Economia da Construção/Anais do ... Simpósio Brasileiro de Gestão e Economia da Construção","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Planner; Work (physics); General partnership; Consolidation (business); Engineering management; Process management; Process (computing); Computer science; Field (mathematics); Work systems; Work in process; Knowledge management; Engineering; Construction engineering; Architectural engineering; Operations research; Business; Operations management; Artificial intelligence; Mechanical engineering","score_opus":0.012430653590184968,"score_gpt":0.220360127099606,"score_spread":0.20792947350942104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208380864","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9423492,0.0035197097,0.0025321976,0.00091363443,0.0063734353,0.0015857953,0.0010670157,0.002543163,0.039115828],"genre_scores_gemma":[0.983131,0.0012628894,0.00827629,0.0017721334,0.0017110691,0.0007181608,0.00079001335,0.0007480535,0.0015903855],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.98647463,0.00070203043,0.0042257784,0.0035758584,0.00069856993,0.0043231],"domain_scores_gemma":[0.99001104,0.0018517362,0.0013408633,0.0036967446,0.0006069859,0.0024926208],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"category_scores_codex":[0.0014785946,0.0030572948,0.003404036,0.0014388764,0.0013244817,0.00287125,0.0022113232,0.0022948345,0.0068070916],"category_scores_gemma":[0.0007437326,0.0036890644,0.0015421638,0.0016740552,0.0018574261,0.00271893,0.0007303919,0.0032557105,0.002203764],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044109055,0.00037539017,0.74363405,0.00076370325,0.0018841374,0.0008536167,0.0011348651,0.029285831,0.0060071624,0.01419815,0.028701724,0.17272031],"study_design_scores_gemma":[0.03075664,0.0010451901,0.4874243,0.004570113,0.002535619,0.01517552,0.022668052,0.050626043,0.057435974,0.00958291,0.29511258,0.023067027],"about_ca_topic_score_codex":0.0001343421,"about_ca_topic_score_gemma":0.00070931786,"teacher_disagreement_score":0.26641086,"about_ca_system_score_codex":0.00317206,"about_ca_system_score_gemma":0.0028887382,"threshold_uncertainty_score":0.9999757},"labels":[],"label_agreement":null},{"id":"W3209474283","doi":"10.46421/sibragec.v11i00.72","title":"Resultados obtidos com a aplicação da polivalência da mão de obra na construção civil: revisão sistemática","year":2021,"lang":"en","type":"article","venue":"Simpósio Brasileiro de Gestão e Economia da Construção/Anais do ... Simpósio Brasileiro de Gestão e Economia da Construção","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Workforce; Context (archaeology); Relevance (law); Economic shortage; Productivity; Work (physics); Resistance (ecology); Knowledge management; Computer science; Political science; Engineering; Economics; Economic growth; Geography; Mechanical engineering","score_opus":0.018130672120923595,"score_gpt":0.24029072196194365,"score_spread":0.22216004984102006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3209474283","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91757125,0.0046960707,0.005848359,0.0022849091,0.0055546835,0.0034476132,0.003897365,0.0036948693,0.053004913],"genre_scores_gemma":[0.9786519,0.0023509192,0.008233944,0.0037384816,0.0020515884,0.0011618759,0.001226858,0.0010897191,0.0014947372],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.97873896,0.0015952471,0.0067496896,0.005229725,0.0011298895,0.0065564914],"domain_scores_gemma":[0.98242855,0.003568991,0.002373504,0.005952941,0.0011875592,0.004488462],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","sts","research_integrity","insufficient_payload"],"category_scores_codex":[0.002971499,0.004527741,0.005372492,0.0021369879,0.002027147,0.005411635,0.003904763,0.0039145006,0.009471361],"category_scores_gemma":[0.0022188714,0.0055592745,0.0024740621,0.0022553194,0.0043279636,0.0033430962,0.001333454,0.0052874153,0.0023333707],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.0010389003,0.0011020281,0.6728698,0.0023996017,0.0048071444,0.001862217,0.002485258,0.0103133675,0.018849922,0.08100677,0.049349673,0.15391533],"study_design_scores_gemma":[0.052523233,0.002277008,0.18733285,0.007839956,0.006404267,0.043987952,0.028543271,0.22464517,0.07287764,0.02716751,0.31120393,0.03519723],"about_ca_topic_score_codex":0.0007874894,"about_ca_topic_score_gemma":0.0010553979,"teacher_disagreement_score":0.48553693,"about_ca_system_score_codex":0.00628409,"about_ca_system_score_gemma":0.008001773,"threshold_uncertainty_score":0.99927205},"labels":[],"label_agreement":null},{"id":"W3210522541","doi":"10.1139/cjce-2020-0429","title":"Generating labour cost budget for a construction-oriented fabrication facility: simulation-based resource scheduling approach","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Crew; Productivity; Operations research; Procurement; Discrete event simulation; Resource (disambiguation); Computer science; Resource planning; Operations management; Engineering; Economics; Simulation; Environmental resource management","score_opus":0.009984921706282481,"score_gpt":0.1969567984652056,"score_spread":0.18697187675892313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3210522541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03136564,0.0005921478,0.9666041,0.000055235607,0.0008428244,0.00013428778,0.000078637175,0.000057238412,0.00026988686],"genre_scores_gemma":[0.95753276,0.000002461828,0.041940305,0.000043458524,0.0003368764,0.00001741825,0.00007838682,0.000025311967,0.000022994227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990321,0.000018969562,0.0004411475,0.00012685056,0.00013178893,0.00024916136],"domain_scores_gemma":[0.9987454,0.00012852438,0.000092547416,0.00013390763,0.00061602186,0.0002836407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019410689,0.00014968433,0.00019823677,0.0002974512,0.00013459248,0.000102878555,0.00008060263,0.00010787517,0.0000672928],"category_scores_gemma":[0.0005332773,0.00017661204,0.00009333941,0.00038134493,0.00002508998,0.00018498542,0.0000024825056,0.00024677723,0.0000012209243],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026330163,0.0000027505027,0.00039002553,0.00008353712,0.000038285365,0.0000035600153,0.000108929395,0.9895199,0.0024002583,0.0009805997,0.00008891507,0.006380615],"study_design_scores_gemma":[0.00039305986,0.000011984901,0.00011606563,0.00006243049,0.000024502635,0.000054696517,0.0002904916,0.95526576,0.003012538,0.000029657214,0.04057128,0.00016753601],"about_ca_topic_score_codex":0.000037032318,"about_ca_topic_score_gemma":0.0018834709,"teacher_disagreement_score":0.92616713,"about_ca_system_score_codex":0.00027101883,"about_ca_system_score_gemma":0.00051215466,"threshold_uncertainty_score":0.720203},"labels":[],"label_agreement":null},{"id":"W3211426857","doi":"10.32920/ryerson.14649519.v1","title":"Investigating building information model to building energy model data transfer integrity and simulation results","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Sciencetech (Canada); University of Waterloo","funders":"Lawrence Berkeley National Laboratory; Construction Industry Council; U.S. General Services Administration; U.S. Department of Energy","keywords":"Building information modeling; Reliability (semiconductor); Building energy simulation; Computer science; Process (computing); Energy modeling; Reliability engineering; Energy (signal processing); Efficient energy use; Energy performance; Simulation; Engineering; Operating system","score_opus":0.058715359176305736,"score_gpt":0.27941112992775324,"score_spread":0.2206957707514475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211426857","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15208471,0.000058461377,0.84529835,0.00014343427,0.0003049233,0.00015880051,0.00026387352,0.00038267652,0.001304741],"genre_scores_gemma":[0.7909667,0.000056528002,0.20763262,0.00017137073,0.00007209756,0.000025692905,0.0010325196,0.000024227975,0.000018235858],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982832,0.000029621691,0.0007520007,0.00044174437,0.0002761091,0.00021731213],"domain_scores_gemma":[0.9988727,0.000060586324,0.000055262244,0.0006685816,0.00019278466,0.00015007894],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033449987,0.00032476243,0.00028727605,0.00027329108,0.00010858752,0.00047356248,0.00030704317,0.0004424854,0.0000053040853],"category_scores_gemma":[0.00018218714,0.00034664213,0.00004871734,0.00019013847,0.000028971353,0.001599702,0.000414032,0.00079615414,7.1263014e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006069038,0.0000027177343,0.0000069288876,0.00012193143,0.00002812889,1.13758944e-7,0.0007924125,0.9505595,0.0020162545,0.011252991,0.00014405511,0.03506888],"study_design_scores_gemma":[0.00019674873,0.0000043621726,0.000009863501,0.00028400213,0.00003462194,0.0000026935054,0.00021447595,0.99140584,0.0027352707,0.0045472034,0.00019805394,0.00036688006],"about_ca_topic_score_codex":0.0003497618,"about_ca_topic_score_gemma":0.00022668937,"teacher_disagreement_score":0.638882,"about_ca_system_score_codex":0.00013607157,"about_ca_system_score_gemma":0.00014717855,"threshold_uncertainty_score":0.99989855},"labels":[],"label_agreement":null},{"id":"W3212254029","doi":"10.5281/zenodo.4762238","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212254029","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W3212424951","doi":"10.18280/ijsse.110506","title":"Numerical and Experimental Predication of the Structural Cracking Within Reinforced Concrete Structure due to Conventional State of Loading","year":2021,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cracking; Structural engineering; Finite element method; Service life; Deformation (meteorology); Ultimate load; Engineering; Computer science; Materials science; Mechanical engineering","score_opus":0.003372532241752602,"score_gpt":0.20807920609142402,"score_spread":0.20470667384967142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212424951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.986013,0.000451706,0.012335192,0.00010882421,0.000966866,0.00004400402,0.000039920495,0.000008841678,0.000031649466],"genre_scores_gemma":[0.99861556,0.000030235353,0.0012399007,0.0000151548065,0.000082044025,4.979015e-7,0.0000052511555,0.0000069966577,0.0000043660248],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991516,0.000014380319,0.00044516646,0.000063729945,0.0002634867,0.00006166311],"domain_scores_gemma":[0.9994593,0.000041199837,0.00015211856,0.000048398302,0.0002487972,0.00005014033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008773767,0.000083678846,0.00015742962,0.00007726177,0.000025032354,0.00002266716,0.000097152195,0.000038862516,0.000028263],"category_scores_gemma":[0.00006322082,0.000071353796,0.000053060172,0.0000858881,0.000035183726,0.0001969403,0.000032541135,0.00017515264,5.717964e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020703426,0.0000028968643,0.0012223278,0.00012911214,0.00039032687,0.000014978036,0.00493159,0.5174737,0.45583835,0.016517052,0.000015562598,0.003257059],"study_design_scores_gemma":[0.00085082,0.00004922769,0.009601722,0.00040147675,0.00002339075,0.0011297443,0.00041240838,0.35485145,0.63180506,0.0005053997,0.00022414395,0.00014516873],"about_ca_topic_score_codex":0.000004371006,"about_ca_topic_score_gemma":0.0000014505002,"teacher_disagreement_score":0.1759667,"about_ca_system_score_codex":0.000046090896,"about_ca_system_score_gemma":0.000030779087,"threshold_uncertainty_score":0.29097235},"labels":[],"label_agreement":null},{"id":"W3213414280","doi":"10.29173/mocs175","title":"BIM-enabled Modular and Industrialized Construction in China","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Industrialisation; China; Modular design; Productivity; Sustainable development; Business; Quality (philosophy); Resource (disambiguation); Industry of China; Engineering; Industrial organization; Economic growth; Computer science; Economics; Political science","score_opus":0.011775746094134386,"score_gpt":0.19460622450448378,"score_spread":0.18283047841034938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213414280","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.988344,0.00083952124,0.0050855177,0.00016248987,0.0013801062,0.00043252314,0.000014475222,0.0004030225,0.0033383265],"genre_scores_gemma":[0.99121094,0.00037837436,0.007849629,0.0000300704,0.00030127304,0.000052964926,0.000023288458,0.000046245084,0.00010720277],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981962,0.000028044109,0.00057193707,0.0005097311,0.0003062138,0.00038789748],"domain_scores_gemma":[0.99921095,0.000013014595,0.00012917233,0.00013725153,0.00022871095,0.00028090426],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035898757,0.0003833262,0.0004601441,0.0005687799,0.00016387078,0.0002787358,0.00010217365,0.00042603747,0.000045998142],"category_scores_gemma":[0.000070146445,0.00039965683,0.000064384876,0.0006621925,0.0003588138,0.0010205882,0.00004973311,0.0005028451,0.00000902745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048827034,0.000077055294,0.38859487,0.00045696864,0.00029115766,0.000021078946,0.0019228879,0.0021751155,0.020890778,0.106907584,0.0019454977,0.47622874],"study_design_scores_gemma":[0.040054977,0.0009870741,0.08414424,0.0014438576,0.0008000215,0.0049970155,0.0318307,0.5314084,0.06942927,0.10551101,0.12282528,0.0065681096],"about_ca_topic_score_codex":0.00011090054,"about_ca_topic_score_gemma":0.000033609955,"teacher_disagreement_score":0.52923334,"about_ca_system_score_codex":0.00015980337,"about_ca_system_score_gemma":0.000053857442,"threshold_uncertainty_score":0.9998455},"labels":[],"label_agreement":null},{"id":"W3214511002","doi":"10.1007/s12205-021-0972-2","title":"SEMA: A Site Equipment Management Assistant for Construction Management","year":2021,"lang":"en","type":"article","venue":"KSCE Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Usability; Interface (matter); Process (computing); Chatbot; Computer science; Engineering; Management system; Information management; Database; World Wide Web; Human–computer interaction; Operations management; Operating system","score_opus":0.005755252153903207,"score_gpt":0.19184277388290716,"score_spread":0.18608752172900395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3214511002","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016466059,0.0013502963,0.96994835,0.00011515268,0.003089067,0.00018673403,0.0000089810255,0.00012259887,0.008712783],"genre_scores_gemma":[0.91733855,0.0006979981,0.08114389,0.000027543812,0.00033436168,0.000032942557,0.000008034543,0.00004650018,0.00037016417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990033,0.0000075965227,0.0004513521,0.000105070976,0.00023221728,0.0002004745],"domain_scores_gemma":[0.9995498,0.000021702923,0.000084469655,0.0001265873,0.00013996355,0.00007747706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001688046,0.00015074246,0.00020032116,0.00020409928,0.000039817547,0.000065537926,0.000079395926,0.000052372816,0.00007507141],"category_scores_gemma":[0.0000079187375,0.00015558937,0.00012755727,0.00020437701,0.00001022039,0.00017977884,0.000020480084,0.00014319812,0.000004455025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074273135,0.00009945934,0.00020253097,0.003175436,0.001899965,0.00042693267,0.00039919524,0.6816368,0.053984232,0.0780395,0.008733447,0.1713282],"study_design_scores_gemma":[0.0058036624,0.00026729624,0.0037836994,0.0023161722,0.001024446,0.0031980183,0.0022775603,0.16950494,0.086468995,0.0031765543,0.72076803,0.0014106359],"about_ca_topic_score_codex":1.9591805e-7,"about_ca_topic_score_gemma":0.000007582919,"teacher_disagreement_score":0.9008725,"about_ca_system_score_codex":0.00018642859,"about_ca_system_score_gemma":0.000012629411,"threshold_uncertainty_score":0.634475},"labels":[],"label_agreement":null},{"id":"W3215358485","doi":"10.1109/iri51335.2021.00039","title":"A Methodology and Tool for the Predictive Analysis of Cost Growth in Construction Projects","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science","score_opus":0.03260400988542194,"score_gpt":0.2671505703585518,"score_spread":0.23454656047312983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215358485","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20517702,0.00015714415,0.79292136,0.00008788219,0.00017469433,0.00020988942,0.000018775527,0.000029126699,0.001224121],"genre_scores_gemma":[0.9805413,0.00008115555,0.019233769,0.0000149051375,0.000013376241,0.00007807412,0.000008053838,0.0000029085352,0.000026460788],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997066,0.000033597767,0.000115022885,0.00006833701,0.000029165589,0.00004723475],"domain_scores_gemma":[0.999575,0.00027418524,0.00001575494,0.00004776792,0.00008104569,0.0000062502772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000119889606,0.000036988655,0.000108948385,0.00010469683,0.0000152447665,0.0000067278906,0.00001590422,0.000040073155,0.000031165488],"category_scores_gemma":[0.00009176803,0.000026760372,0.000033225424,0.00041686182,0.000042430693,0.00004379039,0.0000047315043,0.000040570405,8.20558e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014284362,0.000031423526,0.18380997,0.00017895579,0.0034124502,0.0000015594075,0.0027805348,0.01990258,0.019878326,0.44753045,0.00032855402,0.32200238],"study_design_scores_gemma":[0.0007288029,0.000046610567,0.13491738,0.000014080366,0.00095330353,0.00003804644,0.006864335,0.7687277,0.082764,0.004472069,0.0003341157,0.0001395303],"about_ca_topic_score_codex":0.000032560652,"about_ca_topic_score_gemma":0.0002930682,"teacher_disagreement_score":0.7753643,"about_ca_system_score_codex":0.000013611325,"about_ca_system_score_gemma":0.00001549701,"threshold_uncertainty_score":0.10912563},"labels":[],"label_agreement":null},{"id":"W3215511319","doi":"10.1016/j.istruc.2021.11.018","title":"The twenty-first century of structural engineering research: A topic modeling approach","year":2021,"lang":"en","type":"article","venue":"Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Latent Dirichlet allocation; Topic model; Similarity (geometry); Theme (computing); Computer science; Data science; Political science; Library science; Information retrieval; World Wide Web; Artificial intelligence","score_opus":0.026256507621909186,"score_gpt":0.25096511795616727,"score_spread":0.2247086103342581,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215511319","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97017455,0.00924122,0.01158117,0.00010590694,0.002251791,0.00018903114,0.000016304308,0.00021211611,0.006227905],"genre_scores_gemma":[0.9972823,0.00017129144,0.0022698462,0.0000037689836,0.0001977692,0.000010606291,0.000010637534,0.0000169507,0.00003682976],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991253,0.000028346838,0.00020947965,0.00013702473,0.00025719806,0.00024265751],"domain_scores_gemma":[0.99948454,0.000055293796,0.000016699616,0.00025179604,0.0001494692,0.000042219144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010230418,0.00010912014,0.000113381866,0.000067627516,0.00019518472,0.00007131539,0.00015699182,0.00007886926,0.000035327113],"category_scores_gemma":[0.00006073172,0.00008014589,0.00006331362,0.00025664075,0.000053708558,0.00007594844,0.000038770886,0.0003289143,9.93693e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011486454,0.0000034896543,0.00044513444,0.00023211242,0.00012410377,0.000003529659,0.0012192676,0.72315943,0.009289113,0.23961149,0.00032314353,0.025577705],"study_design_scores_gemma":[0.00022825273,0.000010838964,0.0018035824,0.00003325235,0.000013899896,0.00006358118,0.00180785,0.96347344,0.013056926,0.012447963,0.0068596746,0.00020074206],"about_ca_topic_score_codex":0.000018271125,"about_ca_topic_score_gemma":0.000028368691,"teacher_disagreement_score":0.24031402,"about_ca_system_score_codex":0.000043877102,"about_ca_system_score_gemma":0.000028399318,"threshold_uncertainty_score":0.32682547},"labels":[],"label_agreement":null},{"id":"W3216806283","doi":"10.22260/isarc2021/0138","title":"Towards an Ontology for BIM-Based Robotic Navigation and Inspection Tasks","year":2021,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Building information modeling; Computer science; Scope (computer science); Robotics; Process (computing); Software engineering; Domain (mathematical analysis); Robot; Systems engineering; Artificial intelligence; Download; Human–computer interaction; World Wide Web; Engineering","score_opus":0.012603748065067347,"score_gpt":0.22960319666651893,"score_spread":0.2169994486014516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216806283","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98616403,0.0001465496,0.009958346,0.0006392247,0.00054831046,0.00016821822,0.000005253292,0.00015081555,0.0022192479],"genre_scores_gemma":[0.9952819,0.0000071282866,0.004539624,0.000035550296,0.00007058258,0.000025827576,0.0000059661147,0.000010477925,0.000022960656],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996247,0.000002556931,0.000122671,0.00010201377,0.000068268884,0.00007976697],"domain_scores_gemma":[0.99968696,0.000009300251,0.00003981868,0.00004350574,0.00019806685,0.000022348817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006424812,0.00006602199,0.00008882001,0.000034983263,0.00006573443,0.000027848573,0.000054099717,0.00006699331,0.0000066649177],"category_scores_gemma":[0.00003513946,0.00005552692,0.00003490655,0.00012683184,0.00004642576,0.00015255713,0.000008769382,0.00007297304,4.394324e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007083826,0.00007865007,0.011170681,0.0009339926,0.00008551112,2.6352075e-7,0.0011725567,0.0034461068,0.58721024,0.31218436,0.0013870434,0.082259744],"study_design_scores_gemma":[0.00082933786,0.00013964395,0.014336807,0.00014604999,0.00009127817,0.00007728474,0.0013584057,0.19838654,0.74255896,0.039997373,0.0018424961,0.00023581352],"about_ca_topic_score_codex":0.0000120841,"about_ca_topic_score_gemma":0.00001352068,"teacher_disagreement_score":0.272187,"about_ca_system_score_codex":0.00003454328,"about_ca_system_score_gemma":0.000019655923,"threshold_uncertainty_score":0.22643222},"labels":[],"label_agreement":null},{"id":"W3217612868","doi":"10.29173/mocs169","title":"Analyzing Obstacles and Exploring Opportunities to Improve Modular Industrialized Construction in Lebanon","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Modular design; Flexibility (engineering); Engineering; Prefabrication; Quality (philosophy); Construction engineering; Construction management; Integrated project delivery; Sustainability; Investment (military); Architectural engineering; Business; Civil engineering; Computer science; Management","score_opus":0.06086250026510988,"score_gpt":0.22258994585369488,"score_spread":0.16172744558858498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217612868","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913282,0.00071523164,0.004367641,0.00018577173,0.0014440623,0.00039612953,0.000017900888,0.00033310681,0.0012119565],"genre_scores_gemma":[0.9909682,0.00057584356,0.007847688,0.000034692464,0.00030314448,0.00011663365,0.000016081109,0.000047319318,0.00009038],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9982657,0.00002326498,0.0005748147,0.0004945255,0.00026204126,0.00037967038],"domain_scores_gemma":[0.9991167,0.00001908205,0.00011034771,0.00012991072,0.00027608135,0.0003478854],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034660322,0.00036107813,0.00043296776,0.000741189,0.00016062034,0.00031989586,0.000095203,0.00025698147,0.000018303],"category_scores_gemma":[0.00008444573,0.00039603366,0.00005803503,0.00043709087,0.00023385634,0.0013974045,0.00006225837,0.0003673565,0.0000042952006],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023476963,0.00002679936,0.114548504,0.00026681478,0.00016187463,0.000014058748,0.002527128,0.0012235926,0.042038903,0.027150568,0.00042434165,0.81138265],"study_design_scores_gemma":[0.027953008,0.0016866327,0.04574525,0.0028999168,0.0010497597,0.0022731915,0.2316682,0.22489493,0.2493883,0.030694738,0.1724101,0.009335968],"about_ca_topic_score_codex":0.000106665444,"about_ca_topic_score_gemma":0.000045236247,"teacher_disagreement_score":0.80204666,"about_ca_system_score_codex":0.00019648578,"about_ca_system_score_gemma":0.00005292852,"threshold_uncertainty_score":0.99984914},"labels":[],"label_agreement":null},{"id":"W3217648101","doi":"","title":"Planning for the Rehabilitation of Centre Block: The House’s Experience","year":2021,"lang":"en","type":"article","venue":"Canadian parliamentary review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Block (permutation group theory); Rehabilitation; Physical medicine and rehabilitation; Medicine; Physical therapy; Mathematics; Combinatorics","score_opus":0.01575758264006146,"score_gpt":0.23914664115309556,"score_spread":0.2233890585130341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217648101","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07456941,0.88586175,0.0017561741,0.030404568,0.002538807,0.0024151145,0.00019822482,0.00015468856,0.0021012712],"genre_scores_gemma":[0.97776765,0.016995152,0.0008149032,0.003827023,0.00012346628,0.00027256354,0.000031225612,0.000031326363,0.0001367094],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995701,0.000023927942,0.00016931906,0.00007331056,0.000055913522,0.00010747204],"domain_scores_gemma":[0.9995653,0.00012296268,0.000024201014,0.00018702899,0.000051351046,0.000049127986],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008671403,0.00006048411,0.00009223721,0.0000137681645,0.00008508768,0.00001225112,0.0000871624,0.000017534961,0.0001567174],"category_scores_gemma":[0.000044380446,0.00003937315,0.000060461145,0.00012788604,0.000040960753,0.000047284815,0.000003329975,0.00005367603,0.0000046045852],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005740569,0.000013995778,0.012767143,0.0037966187,0.00023643115,0.0000076268107,0.008298008,0.0037120434,0.0005431068,0.0065862816,0.49141473,0.47261828],"study_design_scores_gemma":[0.000088894645,0.00001154755,0.0014894548,0.0013199332,0.00007130655,0.000018937184,0.0059799687,0.0011870348,0.0006350293,0.00009914657,0.98899627,0.00010250083],"about_ca_topic_score_codex":0.0023132786,"about_ca_topic_score_gemma":0.02828914,"teacher_disagreement_score":0.90319824,"about_ca_system_score_codex":0.0000755438,"about_ca_system_score_gemma":0.000084286505,"threshold_uncertainty_score":0.98944205},"labels":[],"label_agreement":null},{"id":"W334879000","doi":"","title":"Evaluation of Work Zone Strategies and User Delay Costs Associated with Strategies and Treatments","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; University of Waterloo","funders":"","keywords":"Work (physics); Work zone; General partnership; Transport engineering; Agency (philosophy); Christian ministry; Key (lock); Plan (archaeology); Risk analysis (engineering); Public transport; Cost–benefit analysis; Ministry of Transport; Computer science; Engineering management; Operations research; Engineering; Business; Computer security; Finance","score_opus":0.012546642347738632,"score_gpt":0.2238502282136227,"score_spread":0.21130358586588405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W334879000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98047835,0.00046560293,0.004114328,0.000007245182,0.00003337831,0.000118829754,0.0000029233145,0.00007296033,0.014706366],"genre_scores_gemma":[0.99937963,0.000019244626,0.00042731178,0.0000013339643,0.000010116398,0.000014792875,0.000017840715,0.000007216025,0.00012250958],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99955076,0.000025084415,0.00010924803,0.000075319374,0.00017090628,0.00006868349],"domain_scores_gemma":[0.9997622,0.000019019833,0.000027425413,0.000046266945,0.00013042487,0.0000146621405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010491301,0.00008340317,0.00008508556,0.0000402282,0.000027776621,0.00009995975,0.000012734151,0.000052823598,0.000038210335],"category_scores_gemma":[0.000002852053,0.00006301947,0.0000076766955,0.00010208125,0.00004294713,0.00042905952,0.0000023531543,0.00003378655,6.0670226e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018289709,0.0003480895,0.18358204,0.00012844735,0.0021956256,0.0000074604923,0.0014828781,0.16084275,0.017834317,0.25997436,0.0018241022,0.37159705],"study_design_scores_gemma":[0.0037455694,0.00026170182,0.9258896,0.00018189692,0.0006897091,0.000021014777,0.010786596,0.046807412,0.0055549983,0.005534389,0.000084013955,0.00044307872],"about_ca_topic_score_codex":0.00020368413,"about_ca_topic_score_gemma":0.0015196344,"teacher_disagreement_score":0.7423076,"about_ca_system_score_codex":0.000051134826,"about_ca_system_score_gemma":0.000037376387,"threshold_uncertainty_score":0.25698596},"labels":[],"label_agreement":null},{"id":"W34485052","doi":"10.1016/j.ijppaw.2021.08.006","title":"Evaluation of process simulate line simulation usage in early project phases","year":2008,"lang":"en","type":"dissertation","venue":"International Journal for Parasitology Parasites and Wildlife","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"U.S. Geological Survey","keywords":"Process (computing); Computer science; Line (geometry); Systems engineering; Engineering; Programming language; Mathematics","score_opus":0.03804212686690266,"score_gpt":0.40080368523167526,"score_spread":0.3627615583647726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W34485052","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99333656,0.0013866967,0.0010749813,0.000036096942,0.0029197556,0.00056098384,0.00007237027,0.000037261118,0.00057529745],"genre_scores_gemma":[0.9979348,0.0007686778,0.00016841404,0.000026310723,0.00039464305,0.00009143542,0.0004517058,0.000036039277,0.00012793642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99797744,0.00008525062,0.000811549,0.00023604756,0.00069135404,0.00019838405],"domain_scores_gemma":[0.9977296,0.00017352603,0.00040337743,0.00008518034,0.0015575027,0.000050806095],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041963515,0.0002761853,0.00040342702,0.0007113629,0.0000895328,0.000059960577,0.00019131083,0.00036384715,0.000027837092],"category_scores_gemma":[0.0002587268,0.00027076618,0.00013454966,0.00015669006,0.00005369386,0.00033865834,0.000004749964,0.0003655297,0.0000018781096],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009715158,0.00023045686,0.08653853,0.00020359388,0.001155141,0.000027503902,0.0036085881,0.80950105,0.0008906603,0.00019826094,0.0009009542,0.095773764],"study_design_scores_gemma":[0.005008999,0.00043640498,0.097711086,0.0007168254,0.0005434531,0.0003888674,0.00071400806,0.8834025,0.002836291,0.005227785,0.002294798,0.0007189843],"about_ca_topic_score_codex":0.000034715,"about_ca_topic_score_gemma":0.00022107406,"teacher_disagreement_score":0.095054775,"about_ca_system_score_codex":0.00012737137,"about_ca_system_score_gemma":0.00023308354,"threshold_uncertainty_score":0.9999744},"labels":[],"label_agreement":null},{"id":"W367064978","doi":"10.22260/isarc2004/0076","title":"Integrated 3D Object Transformation and Simulation for Tower Crane Operations on Construction Sites","year":2004,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Neurosurgery Research and Education Foundation","keywords":"Lift (data mining); Computer science; Tower; Animation; Transformation (genetics); Computer graphics (images); 3D modeling; Engineering drawing; Model transformation; Simulation; Engineering; Structural engineering; Artificial intelligence","score_opus":0.011054884688218532,"score_gpt":0.22015913644642057,"score_spread":0.20910425175820205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W367064978","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9764989,0.00003627076,0.018727375,0.00035350712,0.00028053537,0.0005529804,0.000023296698,0.0001308833,0.0033962657],"genre_scores_gemma":[0.9949719,0.000018489192,0.004833694,0.000029168985,0.000049031947,0.000043931126,0.000010877997,0.000011861085,0.000031081778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994959,0.0000017664004,0.00021650127,0.00009471357,0.000102103186,0.000089019835],"domain_scores_gemma":[0.9996723,0.00002104665,0.000035559475,0.00003920645,0.00021075933,0.000021136817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000077251316,0.00010407115,0.00009721585,0.00008669928,0.0001260386,0.00005274195,0.000056157707,0.00007434564,0.000014705315],"category_scores_gemma":[0.000050777002,0.00007857021,0.00004643013,0.00016875865,0.00006355398,0.0003732575,0.0000041248477,0.00009493982,0.000001342031],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021628577,0.000053567263,0.00058181724,0.00031248052,0.00009469091,2.674426e-8,0.0048438427,0.49734342,0.312518,0.11686629,0.00020821749,0.06696136],"study_design_scores_gemma":[0.0029863948,0.00025548364,0.0012837871,0.00029544078,0.00011133857,0.00003143728,0.0027325945,0.5399148,0.43390372,0.0159871,0.0021232872,0.0003746622],"about_ca_topic_score_codex":0.000009871843,"about_ca_topic_score_gemma":0.000010324607,"teacher_disagreement_score":0.1213857,"about_ca_system_score_codex":0.00006068558,"about_ca_system_score_gemma":0.000013343382,"threshold_uncertainty_score":0.32040003},"labels":[],"label_agreement":null},{"id":"W39517586","doi":"10.3390/ma17215313","title":"Sustainable Tactical Planning for Road Infrastructure Management","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"European Social Fund; Concordia University","keywords":"Business; Environmental planning; Transport engineering; Engineering; Geography","score_opus":0.005275889103929094,"score_gpt":0.2397005408172364,"score_spread":0.2344246517133073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W39517586","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03214752,0.0011735084,0.046455387,0.000018371493,0.00509695,0.0010929082,0.0000130462695,0.0007997291,0.9132026],"genre_scores_gemma":[0.77663106,0.000042822827,0.0070957113,0.000030655803,0.00073723745,0.0005065353,0.0018061922,0.00011387552,0.21303591],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931926,0.00000378935,0.00017571062,0.00012278977,0.000103905026,0.00027454869],"domain_scores_gemma":[0.99972504,0.000010236216,0.000029962841,0.000111342975,0.0000715243,0.00005186618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004201575,0.00018463882,0.00014113085,0.0001350395,0.000073841584,0.000057838774,0.000072153685,0.00027097188,0.00048389198],"category_scores_gemma":[0.0000053455606,0.00017313313,0.00006746542,0.00007800944,0.000005588012,0.00016053658,0.000004820904,0.00018858141,0.000017341576],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012397066,0.000019804367,0.0002519324,0.0041794335,0.0005349151,0.000008833083,0.001496023,0.0042712125,0.00031172048,0.5338959,0.11254583,0.3423604],"study_design_scores_gemma":[0.0010906624,0.00006617252,0.035621084,0.00026595304,0.0005918355,0.000026579666,0.05683017,0.0140464,0.0043215035,0.016096314,0.8695114,0.001531874],"about_ca_topic_score_codex":0.0000081879125,"about_ca_topic_score_gemma":0.0000080494765,"teacher_disagreement_score":0.75696564,"about_ca_system_score_codex":0.00009779828,"about_ca_system_score_gemma":0.0000129940245,"threshold_uncertainty_score":0.70601636},"labels":[],"label_agreement":null},{"id":"W39773279","doi":"10.22260/isarc2013/0127","title":"Automatic Generation of BIM Using Parametric Family","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Caisson; Parametric statistics; Computer science; Process (computing); Parametric model; Parametric design; Engineering; Engineering drawing; Structural engineering; Operating system","score_opus":0.02715872810437804,"score_gpt":0.21026161080028583,"score_spread":0.1831028826959078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W39773279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99609494,0.00012100643,0.0005170702,0.000030923984,0.0003060234,0.00015636944,0.0000012323701,0.000059638347,0.002712821],"genre_scores_gemma":[0.9949081,0.000010912543,0.0049636746,0.000011858092,0.000055767938,0.0000115497705,3.4291034e-7,0.0000106949055,0.00002713085],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948204,0.0000019971633,0.00022517564,0.000063772,0.00014237371,0.00008463675],"domain_scores_gemma":[0.9996492,0.000010941808,0.00008984256,0.000055181863,0.00017722342,0.000017608278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006459565,0.0000720212,0.00010603243,0.0001168444,0.00003200117,0.000025294828,0.00011900419,0.000050453105,0.00004830166],"category_scores_gemma":[0.000044163007,0.00005321972,0.000050412822,0.00041019186,0.00004124327,0.00022531656,0.000017021937,0.00006624012,0.000006975037],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.374519e-7,0.000011142787,0.003279632,0.00016073552,0.000026912117,6.2209273e-9,0.00017353144,0.00093653577,0.96349525,0.005436853,0.0014801697,0.024998581],"study_design_scores_gemma":[0.00011010787,0.000014887668,0.007992522,0.00006533581,0.00002678959,0.000005704721,0.00033242378,0.71461385,0.27423933,0.0024378824,0.00007250784,0.00008866229],"about_ca_topic_score_codex":0.000048748294,"about_ca_topic_score_gemma":4.57629e-7,"teacher_disagreement_score":0.7136773,"about_ca_system_score_codex":0.000031299915,"about_ca_system_score_gemma":0.000008763296,"threshold_uncertainty_score":0.21702372},"labels":[],"label_agreement":null},{"id":"W41663545","doi":"10.22260/isarc2013/0030","title":"Simulation Applications in Construction Site Layout Planning","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Interdependence; Simulation modeling; Site planning; Download; Industrial engineering; Engineering; Engineering drawing; World Wide Web","score_opus":0.008611407247806728,"score_gpt":0.213155691069491,"score_spread":0.20454428382168427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W41663545","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98534393,0.000053434665,0.0018894931,0.00007001478,0.00013500528,0.00031037096,0.0000023886296,0.000103178565,0.012092155],"genre_scores_gemma":[0.99869895,0.0000023143225,0.001100234,0.000010322241,0.00005042985,0.0000700464,0.0000018643058,0.000009745037,0.00005609733],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954385,0.0000016050888,0.00018590207,0.00008196886,0.0000938365,0.00009286391],"domain_scores_gemma":[0.99974203,0.000024241515,0.00005685051,0.000050165178,0.00010835366,0.000018361592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000044378583,0.00007323877,0.000078109755,0.00008466213,0.000045655805,0.00003130045,0.00009009911,0.000057811507,0.000037284444],"category_scores_gemma":[0.000019715553,0.000058650472,0.000031619697,0.0002553666,0.00004690703,0.00028693347,0.00001526835,0.00011373811,0.000016582035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008918619,0.00003114407,0.5610607,0.00024299086,0.00003529046,2.878209e-8,0.0030817317,0.25438213,0.10711227,0.038914114,0.0008689131,0.03426177],"study_design_scores_gemma":[0.0005800207,0.000022717773,0.16117834,0.00023000545,0.00003545131,0.000011318752,0.004786524,0.7593353,0.04037975,0.02851055,0.004527459,0.00040258054],"about_ca_topic_score_codex":0.000023033588,"about_ca_topic_score_gemma":0.0000018260757,"teacher_disagreement_score":0.50495315,"about_ca_system_score_codex":0.000038249735,"about_ca_system_score_gemma":0.000004478559,"threshold_uncertainty_score":0.23916969},"labels":[],"label_agreement":null},{"id":"W4200190812","doi":"10.3390/su14010288","title":"Bim Machine Learning and Design Rules to Improve the Assembly Time in Steel Construction Projects","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Duration (music); Parametric statistics; Camber (aerodynamics); Engineering; Construction engineering; Computer science; Manufacturing engineering; Industrial engineering; Systems engineering; Operations management; Structural engineering","score_opus":0.00610832271846377,"score_gpt":0.21942038119084675,"score_spread":0.213312058472383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200190812","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97874707,0.00027182407,0.01842326,0.0009123354,0.00018660675,0.00056967296,0.0000044715543,0.00015868412,0.00072605506],"genre_scores_gemma":[0.9972671,0.000013775905,0.0023197562,0.000021048481,0.0000329011,0.00006790415,0.0000045867555,0.000010758086,0.00026216183],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992533,0.00015267567,0.00016043079,0.00018716697,0.00008071267,0.00016575558],"domain_scores_gemma":[0.9994988,0.00009637365,0.000017969223,0.00013057076,0.00021901207,0.000037285525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034135187,0.00009920253,0.00010925602,0.000059204915,0.000086556574,0.000062534324,0.000039191615,0.000064088745,0.000029985777],"category_scores_gemma":[0.00047732115,0.000080442005,0.000022399374,0.00025002184,0.000058100988,0.00011252981,0.000029535691,0.00022219714,0.000005399308],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014077302,0.000075646756,0.06746267,0.0006244171,0.00006891953,0.000031940996,0.003334194,0.02326769,0.04160651,0.026788386,0.00023135333,0.8363675],"study_design_scores_gemma":[0.0025594847,0.0005296794,0.16460964,0.00012732964,0.00010048797,0.00035824368,0.030947492,0.570521,0.11641571,0.08612662,0.026147546,0.001556798],"about_ca_topic_score_codex":0.000059630038,"about_ca_topic_score_gemma":0.00006458664,"teacher_disagreement_score":0.83481073,"about_ca_system_score_codex":0.0002761829,"about_ca_system_score_gemma":0.00014490611,"threshold_uncertainty_score":0.32803297},"labels":[],"label_agreement":null},{"id":"W4200209404","doi":"10.2118/207380-ms","title":"Digitally Enabled Organizations- Leveraging New Age Technologies","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Arbutus Biopharma (Canada)","funders":"","keywords":"Computer science; Asset (computer security); Leverage (statistics); Context (archaeology); Process (computing); Process management; Risk analysis (engineering); Engineering; Computer security; Business","score_opus":0.0068351791014226925,"score_gpt":0.17580296657166916,"score_spread":0.16896778747024646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200209404","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03767647,0.00047704938,0.6723353,0.00083454093,0.0007381093,0.00007257794,0.0000023814755,0.0055903266,0.2822732],"genre_scores_gemma":[0.98419976,0.000051262126,0.006031795,0.000038542734,0.00003196478,0.0000021895273,0.000017379793,0.000012438368,0.009614659],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99971443,0.000001996758,0.00008484228,0.0000738482,0.000046838613,0.000078016405],"domain_scores_gemma":[0.9998036,0.000007864401,0.00000556762,0.000108946435,0.000058439084,0.000015600499],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000007080155,0.00005629197,0.000052041894,0.000040600622,0.00003182764,0.00009047623,0.00004575878,0.000048828533,0.0004392939],"category_scores_gemma":[0.000045060213,0.000053835898,0.000013263542,0.0003791842,0.000010043841,0.00014827342,0.000015511241,0.000060913255,0.00007049433],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020509501,0.000024452907,0.002922473,0.000054216565,0.00013474526,0.000103532926,0.0006621374,0.015293533,0.11157134,0.22656208,0.07455338,0.56811607],"study_design_scores_gemma":[0.00043665114,0.000010071014,0.0010352244,0.00003634313,0.00002085832,0.00021328754,0.003250331,0.008746584,0.78936416,0.02855889,0.16784479,0.00048281206],"about_ca_topic_score_codex":0.000004351957,"about_ca_topic_score_gemma":0.000023085928,"teacher_disagreement_score":0.9465233,"about_ca_system_score_codex":0.000023722983,"about_ca_system_score_gemma":0.000038393526,"threshold_uncertainty_score":0.48099598},"labels":[],"label_agreement":null},{"id":"W4200505084","doi":"10.1108/jedt-05-2021-0287","title":"A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects","year":2021,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Plan (archaeology); Site planning; Engineering; Simple (philosophy); Computer science; Systems engineering; Construction engineering; Transport engineering; Civil engineering","score_opus":0.012456056153206494,"score_gpt":0.2337221742568084,"score_spread":0.22126611810360192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200505084","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3205611,0.00042132384,0.67871684,0.00001778124,0.00017365717,0.000060377035,0.0000015601772,0.00004373203,0.0000036038982],"genre_scores_gemma":[0.71513015,0.000014204548,0.28480944,0.0000028370948,0.000028004053,0.0000033783504,0.0000011633952,0.000009593422,0.0000012084084],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994014,0.0000067349647,0.00035278292,0.00007747168,0.000067678266,0.00009392578],"domain_scores_gemma":[0.99916404,0.0004025781,0.00009946421,0.00005610644,0.000254536,0.000023287934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017805197,0.00009331329,0.00019834594,0.0003732613,0.00003061244,0.000021266878,0.000030814677,0.00013505973,0.0000034287013],"category_scores_gemma":[0.00051020185,0.00008839073,0.000032368294,0.00021566132,0.000029436405,0.000103876635,0.00000682597,0.00017010809,7.797922e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027395085,0.0000053107583,0.0015104874,0.000099263925,0.00003733692,0.000007852053,0.00010103942,0.8867706,0.061761405,0.0014017252,0.000008945221,0.04826865],"study_design_scores_gemma":[0.0005272462,0.00012794598,0.00008334202,0.00026413787,0.000030946798,0.00017634615,0.00019497384,0.9615664,0.036193226,0.00056225335,0.00018562493,0.00008755963],"about_ca_topic_score_codex":2.140027e-7,"about_ca_topic_score_gemma":2.337841e-7,"teacher_disagreement_score":0.39456904,"about_ca_system_score_codex":0.000023598,"about_ca_system_score_gemma":0.000052448733,"threshold_uncertainty_score":0.36044693},"labels":[],"label_agreement":null},{"id":"W4200618909","doi":"10.18280/mmep.080605","title":"Durability Control of Brickwork's Material Including Operation Parameters of the Building Enclosure","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Durability; Brickwork; Brick; Enclosure; Building material; Corrosion; Material properties; Process (computing); Process engineering; Mechanical engineering; Construction engineering; Computer science; Materials science; Engineering; Forensic engineering; Environmental science; Civil engineering; Composite material","score_opus":0.01629526987443526,"score_gpt":0.19366930281186656,"score_spread":0.17737403293743131,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200618909","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46109003,0.000107619315,0.5384776,0.000021777516,0.00013651636,0.000070163405,0.0000045522324,0.000039572464,0.00005219331],"genre_scores_gemma":[0.97439015,0.000023785436,0.025528803,0.0000025819081,0.000020293643,0.000013882126,0.0000013291096,0.000014315049,0.0000048696147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992757,0.000017576867,0.00036456826,0.00010627312,0.000119908276,0.00011601673],"domain_scores_gemma":[0.99965,0.00008020624,0.000037904963,0.00014595945,0.00005602809,0.000029877032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017943182,0.0001072159,0.00021506361,0.000029425211,0.000036669655,0.000027505692,0.00005937058,0.000078023186,0.000012631203],"category_scores_gemma":[0.000041271844,0.00008379266,0.0000588379,0.00011183127,0.000036172158,0.000070575006,0.000019367424,0.00011587715,3.3327964e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020701136,0.000009923977,0.000067072506,0.0006078981,0.000027123957,1.3213118e-7,0.0002189615,0.9264372,0.06003403,0.012073145,0.0000012229185,0.00052123517],"study_design_scores_gemma":[0.00013136034,0.0000076215106,0.00003059602,0.00026551346,0.000025922354,0.000012841708,0.000023989338,0.9200711,0.073721536,0.0056153876,0.000013385736,0.000080693375],"about_ca_topic_score_codex":0.000004339067,"about_ca_topic_score_gemma":4.2743244e-7,"teacher_disagreement_score":0.5133001,"about_ca_system_score_codex":0.000018575369,"about_ca_system_score_gemma":0.000009763092,"threshold_uncertainty_score":0.34169653},"labels":[],"label_agreement":null},{"id":"W4206504907","doi":"10.4236/ojapps.2022.121006","title":"Building Information Modeling for Environmental Impact Assessment in Early Design Phases: A Literature Review","year":2022,"lang":"en","type":"review","venue":"Open Journal of Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Building information modeling; Process (computing); Life-cycle assessment; Bridge (graph theory); Environmental impact assessment; Relation (database); Architectural engineering; Engineering; Engineering design process; Systems engineering; Computer science; Construction engineering; Operations management; Mechanical engineering","score_opus":0.05630698621511863,"score_gpt":0.3582986963300026,"score_spread":0.30199171011488396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206504907","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000012783612,0.9386801,0.058816902,0.000004983351,0.00021796241,0.0011111314,0.000024190329,0.000005469604,0.0011264683],"genre_scores_gemma":[0.00022375742,0.9712733,0.028238626,0.000019892645,0.00004347511,0.00017284228,0.000016902644,0.0000091814245,0.000002038119],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985364,0.00004496139,0.0008503198,0.00010498696,0.0003127814,0.00015055625],"domain_scores_gemma":[0.99933934,0.000082761864,0.00043431777,0.00007900659,0.000014824269,0.000049762977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001845449,0.00019303198,0.0006738481,0.00033401005,0.00013848118,0.00049389794,0.00064134353,0.0000660104,0.000105555024],"category_scores_gemma":[0.000010957275,0.00013592334,0.00020276973,0.00047342846,0.000024559215,0.0013527784,0.000046015295,0.0004649625,9.452389e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000525382,0.000007373428,1.9093895e-7,0.001702103,0.000029028348,9.436482e-7,0.000096825774,0.02666944,0.0000028625243,0.00043351727,0.00013829689,0.9709142],"study_design_scores_gemma":[0.00055313297,0.00033208652,4.2758424e-7,0.0410287,0.00029394042,0.00033254648,0.00027786178,0.049723204,0.000004521148,0.00095487875,0.90602154,0.00047717735],"about_ca_topic_score_codex":9.484796e-7,"about_ca_topic_score_gemma":1.8088106e-7,"teacher_disagreement_score":0.970437,"about_ca_system_score_codex":0.00036273836,"about_ca_system_score_gemma":0.00031429963,"threshold_uncertainty_score":0.5542793},"labels":[],"label_agreement":null},{"id":"W4206790465","doi":"10.3390/buildings12020098","title":"Selecting Appropriate Risk Response Strategies Considering Utility Function and Budget Constraints: A Case Study of a Construction Company in Iran","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Solver; Metaheuristic; Project management; Mathematical optimization; Computer science; Engineering; Operations research; Algorithm; Mathematics; Systems engineering","score_opus":0.015423267962186099,"score_gpt":0.22964972910791157,"score_spread":0.21422646114572547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206790465","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9937171,0.000091952854,0.005113172,0.000008951,0.00032338273,0.00038343013,0.000019131216,0.00017782426,0.0001650575],"genre_scores_gemma":[0.998754,0.000004225081,0.0011381903,0.000004407784,0.000015691556,0.00006408773,0.0000016479407,0.000015966265,0.0000017594144],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99870926,0.00028357885,0.000432858,0.0002465204,0.00015697721,0.00017079875],"domain_scores_gemma":[0.9995024,0.0001497988,0.00013216141,0.00013082985,0.000044940432,0.000039872324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077440415,0.00015285362,0.00023126243,0.00027585018,0.00025855508,0.000054235985,0.00004567236,0.0000505267,0.000074581505],"category_scores_gemma":[0.000065251406,0.00017728323,0.0000298949,0.0004175035,0.00014816575,0.0002247407,0.000041679432,0.00043060476,3.0464307e-7],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026764015,0.0005862495,0.5577508,0.0003667424,0.0004791889,0.00048922916,0.055321783,0.07999609,0.07451749,0.005399482,0.00010039542,0.22231616],"study_design_scores_gemma":[0.005315223,0.0009240147,0.051645853,0.00005959663,0.00015490255,0.009917991,0.83908015,0.08649046,0.000940549,0.0045350776,0.00030686418,0.0006293168],"about_ca_topic_score_codex":0.00092651235,"about_ca_topic_score_gemma":0.0004199385,"teacher_disagreement_score":0.78375834,"about_ca_system_score_codex":0.00009853163,"about_ca_system_score_gemma":0.0000447894,"threshold_uncertainty_score":0.7229401},"labels":[],"label_agreement":null},{"id":"W4207013828","doi":"10.1061/(asce)co.1943-7862.0002250","title":"Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Adaptive neuro fuzzy inference system; Computer science; Machine learning; Artificial intelligence; Artificial neural network; Fuzzy logic; Neuro-fuzzy; Inference; Data mining; Fuzzy control system","score_opus":0.0044025748185134534,"score_gpt":0.1593667130382603,"score_spread":0.15496413821974686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4207013828","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6994404,0.00035162174,0.2987282,0.00007455496,0.0009711617,0.0001459797,0.000010403463,0.00005035315,0.00022726944],"genre_scores_gemma":[0.96500033,0.00065996725,0.034216303,0.000011826247,0.000047350837,0.0000204093,0.000003707124,0.000012323507,0.00002775613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941534,0.0000063499865,0.00028122013,0.000075478296,0.0001272715,0.000094316296],"domain_scores_gemma":[0.9997905,0.0000141595965,0.00006652092,0.00004126382,0.000053486594,0.000034073484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013895753,0.000090407026,0.00012565679,0.0003252311,0.0000887241,0.000026230655,0.00004104948,0.00001663503,0.000013418502],"category_scores_gemma":[0.0000050187364,0.00009944118,0.000023458651,0.00011543098,0.000032791264,0.00017742111,0.000021269838,0.00013192503,1.0650494e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027370297,0.000007914283,0.0018666174,0.00020550558,0.00006366085,0.000002565573,0.00012867717,0.91043264,0.00038519924,0.04606269,0.000106545085,0.040710647],"study_design_scores_gemma":[0.0006749056,0.000054033273,0.0022603353,0.00003245663,0.000030063355,0.0010969327,0.00048079537,0.99041176,0.00018583862,0.0008797963,0.003771188,0.0001218692],"about_ca_topic_score_codex":3.8719568e-7,"about_ca_topic_score_gemma":4.4956474e-7,"teacher_disagreement_score":0.2655599,"about_ca_system_score_codex":0.00008022503,"about_ca_system_score_gemma":0.0000120255745,"threshold_uncertainty_score":0.40550938},"labels":[],"label_agreement":null},{"id":"W4210503480","doi":"10.1007/978-981-16-6932-3_44","title":"VPL Prototypes for Determining Disassembly Parameters of BIM Models","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Building information modeling; Reuse; Computer science; Interface (matter); Systems engineering; Information model; Engineering; Software engineering; Scheduling (production processes)","score_opus":0.01566586439022928,"score_gpt":0.20586542830894747,"score_spread":0.19019956391871817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210503480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017448334,0.0015970329,0.97676253,0.00002245447,0.0013392158,0.0012126561,0.00010920773,0.00041965413,0.016792398],"genre_scores_gemma":[0.98003805,0.00012950713,0.018458296,0.000016135995,0.00015686397,0.00059552875,0.00007216349,0.00022612495,0.00030734966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886674,0.000003937953,0.00043619057,0.00026358824,0.00017994452,0.0002495869],"domain_scores_gemma":[0.99938744,0.00021069615,0.00008024944,0.0002465531,0.000035258035,0.0000398124],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008990401,0.00037265063,0.0004356037,0.00037982463,0.00004451501,0.000017217677,0.00017312566,0.00031329485,0.000089029425],"category_scores_gemma":[0.000049273098,0.0004094765,0.00018045912,0.00008137325,0.000021922979,0.000118970354,0.00004032108,0.00050840486,6.549473e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010182729,0.0000033274998,0.0000034920647,0.0004302273,0.00006821799,0.0000020803577,0.00025762824,0.9521665,0.0011987606,0.017631609,0.0000077644145,0.028220236],"study_design_scores_gemma":[0.00038756063,0.00015949794,0.0000033121241,0.00065571384,0.00007792855,0.000023201554,0.0000061743576,0.94950897,0.009050423,0.026657583,0.012677901,0.0007917576],"about_ca_topic_score_codex":0.00000670659,"about_ca_topic_score_gemma":0.00014064363,"teacher_disagreement_score":0.9782932,"about_ca_system_score_codex":0.0001611139,"about_ca_system_score_gemma":0.000028706412,"threshold_uncertainty_score":0.9998357},"labels":[],"label_agreement":null},{"id":"W4210517762","doi":"10.1109/wsc.2001.977484","title":"On the use of fuzzy clustering in construction simulation","year":2002,"lang":"en","type":"article","venue":"Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cluster analysis; Computer science; Fuzzy clustering; Fuzzy logic; Discrete event simulation; Data mining; Fuzzy set; Object (grammar); Simulation; Artificial intelligence","score_opus":0.09102927008037776,"score_gpt":0.251150373096839,"score_spread":0.16012110301646126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210517762","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9546728,0.0000045803736,0.0399859,0.00025804524,0.0010484211,0.00047775375,0.000012222385,0.000106205174,0.0034340716],"genre_scores_gemma":[0.9965732,0.000013993147,0.0030327188,0.000047349615,0.00009267074,0.000017902505,0.0000034404022,0.000024053832,0.00019469009],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864537,0.000044691482,0.0006007551,0.00020470069,0.00029134887,0.00021315266],"domain_scores_gemma":[0.99872357,0.0003315996,0.00024861904,0.0002534891,0.00040722342,0.000035519493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017083994,0.00021057055,0.00022585182,0.00020807546,0.00008551756,0.00007603724,0.00023903795,0.00012176918,0.0003841116],"category_scores_gemma":[0.00032784193,0.00015545731,0.00009990929,0.0003940822,0.00013543232,0.0005111497,0.000044493678,0.00019813066,0.000025203475],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034230878,0.000028290428,0.006213761,0.00006441028,0.000026937427,8.2962345e-8,0.00081122416,0.9704342,0.010600285,0.0030317483,0.00017379234,0.008581049],"study_design_scores_gemma":[0.0003059794,0.000033806467,0.0021468252,0.0003293013,0.00001788642,0.0000021798185,0.00017999244,0.99291134,0.002176945,0.0016151521,0.00012981333,0.0001507889],"about_ca_topic_score_codex":0.000026130007,"about_ca_topic_score_gemma":0.000026366572,"teacher_disagreement_score":0.041900378,"about_ca_system_score_codex":0.00010541598,"about_ca_system_score_gemma":0.000017284385,"threshold_uncertainty_score":0.6339365},"labels":[],"label_agreement":null},{"id":"W4210537281","doi":"10.1007/s12205-022-0708-y","title":"Dynamic Multi-objective Construction Site Layout Planning Based on BIM","year":2022,"lang":"en","type":"article","venue":"KSCE Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Plan (archaeology); Building information modeling; Particle swarm optimization; Quality (philosophy); Order (exchange); Transport engineering; Engineering; Construction management; Computer science; Construction engineering; Operations research; Systems engineering; Civil engineering; Operations management; Scheduling (production processes)","score_opus":0.0057563601497910176,"score_gpt":0.20089978128841868,"score_spread":0.19514342113862765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210537281","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34193027,0.0005902111,0.65169543,0.000062000334,0.0041369577,0.00011695614,0.000026264808,0.0002653766,0.0011765505],"genre_scores_gemma":[0.994063,0.0000072300486,0.0057421327,0.000025327607,0.00009442535,0.000009077633,0.0000048220963,0.000037008092,0.000016986329],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990613,0.000025893425,0.00034544436,0.00009544666,0.0002948318,0.00017707642],"domain_scores_gemma":[0.99957925,0.00006125897,0.000115034054,0.000103367965,0.00007054056,0.000070537615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020214633,0.00015933448,0.00019579768,0.00047499698,0.00010138263,0.000033033157,0.000108323096,0.000049593335,0.00015006562],"category_scores_gemma":[0.000034863187,0.00017066365,0.000115560404,0.00028532164,0.000014944059,0.0001732178,0.0000134038155,0.0006538066,0.000004078924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023680272,0.000014521429,0.0006298121,0.000023284056,0.00003914636,0.000020532787,0.00020789311,0.9904004,0.0062623383,0.00016742772,0.00009454215,0.002116439],"study_design_scores_gemma":[0.0006725154,0.00011972912,0.0024368449,0.00009626971,0.000025139869,0.00035255164,0.0003695286,0.9926598,0.0008324373,0.000026689806,0.002226833,0.00018163036],"about_ca_topic_score_codex":0.0000023204093,"about_ca_topic_score_gemma":0.000009811178,"teacher_disagreement_score":0.65213275,"about_ca_system_score_codex":0.00033962502,"about_ca_system_score_gemma":0.0000379671,"threshold_uncertainty_score":0.69594616},"labels":[],"label_agreement":null},{"id":"W4210645327","doi":"10.1088/1757-899x/1218/1/012023","title":"Assessment of existing BIM implementation processes of a public organization to improve building assets management and maintenance","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Asset (computer security); Asset management; Process management; Control (management); Quality (philosophy); Computer science; Engineering management; Knowledge management; Risk analysis (engineering); Construction engineering; Business; Engineering; Operations management; Computer security","score_opus":0.01762772329096488,"score_gpt":0.2570089446521149,"score_spread":0.23938122136115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210645327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9664645,0.000021424365,0.032739628,0.00004040728,0.00032742173,0.00018181681,0.00002965867,0.000059589234,0.0001355544],"genre_scores_gemma":[0.9888747,0.000054875232,0.010975765,0.0000047575877,0.000011746465,0.00005636845,0.0000058133605,0.000009620269,0.000006405231],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99916625,0.0000087210165,0.000254023,0.00016598975,0.00023561248,0.00016943012],"domain_scores_gemma":[0.9995257,0.000009548832,0.000067909496,0.00008275877,0.0002683235,0.000045748635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000410942,0.00009446195,0.00013384876,0.0002156112,0.00013159323,0.00012583841,0.000114464565,0.0000132506175,0.000050532588],"category_scores_gemma":[0.000051723386,0.00009924108,0.000004426329,0.0006816778,0.00006207917,0.00051021314,0.00012523058,0.00003651008,8.332421e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000013506233,0.0000032740968,0.0005540089,0.00038349198,0.000007210005,3.4574805e-7,0.00023407012,0.0016255013,0.93521094,0.056251414,0.0000024696049,0.0057259137],"study_design_scores_gemma":[0.00020390411,0.00012157007,0.031896677,0.00008877922,0.000014154434,0.000023767416,0.003679893,0.003934357,0.9592534,0.00025719262,0.0003100278,0.00021630237],"about_ca_topic_score_codex":0.000015594334,"about_ca_topic_score_gemma":0.0000042197353,"teacher_disagreement_score":0.05599422,"about_ca_system_score_codex":0.00006892397,"about_ca_system_score_gemma":0.00007685702,"threshold_uncertainty_score":0.40469337},"labels":[],"label_agreement":null},{"id":"W4210789919","doi":"10.5703/1288284315866","title":"Stroboscope","year":2007,"lang":"ca","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Purdue Pharma (Canada)","funders":"","keywords":"Acronym; Stroboscope; Computer science; State (computer science); Programming language; Engineering drawing; Engineering; Electrical engineering; Linguistics","score_opus":0.02192975702297884,"score_gpt":0.26653771908640755,"score_spread":0.24460796206342872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210789919","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00041797303,0.002149494,0.08258261,0.000025280664,0.009639218,0.00016601487,0.000016658509,0.00036635468,0.9046364],"genre_scores_gemma":[0.21087907,0.011528511,0.0172049,0.00019487701,0.00968938,0.00005851661,0.000624317,0.00038016343,0.74944025],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99827987,0.000010639383,0.0006052976,0.00029004065,0.0004753324,0.0003388158],"domain_scores_gemma":[0.99911994,0.000028987948,0.000101317026,0.00034615526,0.00027692528,0.00012665686],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00025236583,0.00035893897,0.00035569773,0.00027524112,0.00006505683,0.00008835952,0.0001293709,0.00074590585,0.012288718],"category_scores_gemma":[0.000025979693,0.00034217423,0.00019744816,0.00023187856,0.000047899957,0.000103821425,0.000021568154,0.0006804704,0.001415394],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010028997,0.000027030745,0.0010616804,0.0005378773,0.0004157115,0.000047891277,0.00006658999,0.0007522497,0.0006093751,0.0320381,0.14086726,0.8235662],"study_design_scores_gemma":[0.00013091009,0.000033050434,0.0004934563,0.0001825179,0.0000980156,0.00024522227,0.00015069003,0.0009934885,0.002317916,0.00015809834,0.9947319,0.00046470307],"about_ca_topic_score_codex":0.00022998123,"about_ca_topic_score_gemma":0.00013977394,"teacher_disagreement_score":0.85386467,"about_ca_system_score_codex":0.00037340453,"about_ca_system_score_gemma":0.00029186808,"threshold_uncertainty_score":0.999903},"labels":[],"label_agreement":null},{"id":"W4212893074","doi":"10.1109/wsc.2012.6465165","title":"Simulation of mobile crane operations in 3D space","year":2012,"lang":"en","type":"article","venue":"Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Lift (data mining); Schedule; Process (computing); Computer science; Industrial engineering; Engineering; Simulation; Operations research; Artificial intelligence; Data mining","score_opus":0.01754669030034026,"score_gpt":0.24892054442089367,"score_spread":0.23137385412055342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4212893074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.899721,0.0002956233,0.007223459,0.0000938306,0.0009912662,0.0007037854,0.00001442843,0.00017529531,0.09078129],"genre_scores_gemma":[0.9981934,0.0000124026255,0.0007093842,0.000011005549,0.00013220096,0.000026398477,0.000002300601,0.000020277317,0.000892648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916947,0.000002245024,0.00035151024,0.00011471574,0.00019037779,0.00017167545],"domain_scores_gemma":[0.9992878,0.000030366637,0.00010791262,0.000057416815,0.00047428624,0.000042209456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015801376,0.00013666302,0.00017221736,0.00015409979,0.000036537385,0.00003720818,0.000161018,0.00011356072,0.00064194284],"category_scores_gemma":[0.000084462874,0.00011441139,0.000055117922,0.00030098017,0.00006160017,0.00088791206,0.000034478893,0.0001571562,0.00004307606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089486784,0.0002771887,0.083363295,0.001031177,0.00013219053,5.408659e-8,0.010964231,0.69461554,0.10721006,0.06194938,0.004342015,0.03602539],"study_design_scores_gemma":[0.00029607053,0.000032990123,0.0055888174,0.00021641528,0.00003312524,0.0000019540505,0.0005282243,0.9631795,0.020035181,0.00044536218,0.0094296085,0.00021273589],"about_ca_topic_score_codex":0.0000061211663,"about_ca_topic_score_gemma":0.0000029375055,"teacher_disagreement_score":0.268564,"about_ca_system_score_codex":0.000052428357,"about_ca_system_score_gemma":0.00001610452,"threshold_uncertainty_score":0.7028824},"labels":[],"label_agreement":null},{"id":"W4212900071","doi":"10.1177/14780771211069999","title":"The use of reinforced learning to support multidisciplinary design in the AEC industry: Assessing the utilization of Markov Decision Process","year":2022,"lang":"en","type":"article","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Multidisciplinary approach; Markov decision process; Process (computing); Engineering design process; Engineering; Risk analysis (engineering); Systems engineering; Decision support system; Management science; Architecture; Computer science; Engineering management; Artificial intelligence; Markov process; Business; Mechanical engineering","score_opus":0.04876883625864213,"score_gpt":0.3259206915831386,"score_spread":0.27715185532449643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4212900071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85942286,0.000026201145,0.13952579,0.00034657537,0.00051015074,0.00011351935,0.0000013812064,0.000008106015,0.000045436173],"genre_scores_gemma":[0.99666834,0.000003649602,0.0031866804,0.000031147076,0.000087751636,0.0000028456602,0.0000023890834,0.000008320469,0.000008874744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838495,0.00023684885,0.0006021377,0.00006152983,0.00061196444,0.000102594306],"domain_scores_gemma":[0.99812114,0.001154636,0.00036334147,0.000076022276,0.00026652042,0.000018323999],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011488552,0.000081611426,0.00010672017,0.00019719919,0.0002253706,0.00009519671,0.0005184635,0.000029290974,0.000012569307],"category_scores_gemma":[0.00036916786,0.000045620858,0.00006719452,0.00032104022,0.00004401514,0.00016421483,0.00010213051,0.0007606673,1.4679242e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007345558,0.0000043429727,0.0025043844,0.0000032095606,0.000025312007,0.0000034126952,0.0033186025,0.8179344,0.0010099758,0.00008427078,0.000029764116,0.17500888],"study_design_scores_gemma":[0.00035283418,0.00019432302,0.03012652,0.00017053695,0.000013970694,0.00059076154,0.0062530087,0.95925325,0.0022184965,0.00037238325,0.00036818266,0.0000857315],"about_ca_topic_score_codex":0.000011317183,"about_ca_topic_score_gemma":0.0000049389896,"teacher_disagreement_score":0.17492315,"about_ca_system_score_codex":0.000076048906,"about_ca_system_score_gemma":0.00006929016,"threshold_uncertainty_score":0.3304763},"labels":[],"label_agreement":null},{"id":"W4213250542","doi":"10.1007/s13296-022-00585-3","title":"Achieving Improved Construction Efficiency for Multi-Story Steel Concentrically Braced Frames","year":2022,"lang":"en","type":"article","venue":"International Journal of Steel Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Structural engineering; Braced frame; Finite element method; Engineering; Seismic loading; Seismic analysis; Structural load; Wind engineering; Frame (networking); Mechanical engineering","score_opus":0.012075508252872232,"score_gpt":0.25266804073832677,"score_spread":0.24059253248545454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213250542","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7628687,0.0020726596,0.21435168,0.0004843093,0.018957943,0.00039533782,0.0002148203,0.00014327749,0.0005112541],"genre_scores_gemma":[0.98144275,0.000046749643,0.017711334,0.000115436465,0.000544981,0.000018367256,0.000013805448,0.000023891862,0.00008269906],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986648,0.000055253284,0.00051141,0.00013384905,0.0004680492,0.00016663497],"domain_scores_gemma":[0.99892724,0.00011307113,0.00034900967,0.00008611189,0.0004556293,0.00006891883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020832951,0.0001583564,0.00020370155,0.00028314095,0.00020179324,0.00008855775,0.00041857426,0.00006853911,0.00026063996],"category_scores_gemma":[0.00012476691,0.00014842166,0.0001883232,0.00011259313,0.00007824079,0.00025427053,0.00004646106,0.0005105715,7.6805793e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00092561106,0.00013914378,0.004601435,0.00006957046,0.0012353085,0.000036618017,0.0021320109,0.14907004,0.26056963,0.046907056,0.00506448,0.5292491],"study_design_scores_gemma":[0.023314198,0.0019818242,0.08135451,0.0002635366,0.0005003361,0.007924558,0.019514753,0.4110044,0.051830724,0.010874533,0.38888574,0.002550883],"about_ca_topic_score_codex":0.0000038644616,"about_ca_topic_score_gemma":0.000003171387,"teacher_disagreement_score":0.52669823,"about_ca_system_score_codex":0.00033439024,"about_ca_system_score_gemma":0.0001035499,"threshold_uncertainty_score":0.605246},"labels":[],"label_agreement":null},{"id":"W4213423733","doi":"10.1016/j.jobe.2022.104254","title":"Parametric-based design optimization of air distribution system in panelized construction","year":2022,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"HVAC; Parametric statistics; Air conditioning; Context (archaeology); Engineering; Atmospheric duct; Automotive engineering; Systems design; Parametric design; Reliability engineering; Computer science; Simulation; Systems engineering; Mechanical engineering","score_opus":0.008494862316628405,"score_gpt":0.18892052254252312,"score_spread":0.1804256602258947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213423733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14293556,0.00020600458,0.8557929,0.000008747626,0.00089640345,0.00007364291,0.000007886046,0.000065153654,0.000013708477],"genre_scores_gemma":[0.933029,0.000010444608,0.06688471,0.0000014783724,0.000044087654,0.000009440576,0.0000052905307,0.000015132591,4.4092766e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999017,0.000041342406,0.0005200359,0.00006042414,0.00025058232,0.00011061791],"domain_scores_gemma":[0.9995421,0.00008195348,0.00018611833,0.000068664565,0.00008825438,0.000032917655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004517262,0.00009390273,0.00020893115,0.00049163465,0.00003448562,0.000012251887,0.00009480127,0.000045339926,0.0000137400675],"category_scores_gemma":[0.000055607547,0.00010315226,0.00007144429,0.0006121359,0.000009504402,0.00014645963,0.000008748194,0.00025878247,1.2072807e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027277589,0.00000924074,0.00019772242,0.00007621207,0.000018236089,0.00000467295,0.000021305925,0.9912697,0.0056245113,0.00086896145,0.000024098113,0.001858074],"study_design_scores_gemma":[0.00055132783,0.000058672515,0.00018006215,0.00010234215,0.000019186895,0.00017102607,0.00017915785,0.9857256,0.012734719,0.000011045282,0.00017772678,0.00008917133],"about_ca_topic_score_codex":0.000003839499,"about_ca_topic_score_gemma":9.824281e-8,"teacher_disagreement_score":0.7900934,"about_ca_system_score_codex":0.0005028256,"about_ca_system_score_gemma":0.00003870414,"threshold_uncertainty_score":0.42064273},"labels":[],"label_agreement":null},{"id":"W4220659750","doi":"10.3390/buildings12030354","title":"Towards Automated Construction Quantity Take-Off: An Integrated Approach to Information Extraction from Work Descriptions","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer science; Hidden Markov model; Conditional random field; Information extraction; Artificial intelligence; Process (computing); Machine learning; Natural language processing; Named-entity recognition; Field (mathematics); Engineering","score_opus":0.015444921178924256,"score_gpt":0.2254504924078148,"score_spread":0.21000557122889055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220659750","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6849824,0.00004260554,0.30760196,0.000056075627,0.001931066,0.00028768444,0.00012361557,0.002495027,0.0024795304],"genre_scores_gemma":[0.92376757,0.000010200815,0.07503222,0.00009798662,0.00009385669,0.00020902476,0.0007426173,0.000022916638,0.000023594084],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988753,0.00006166133,0.0003752623,0.00020071027,0.0002848237,0.00020222952],"domain_scores_gemma":[0.9994534,0.000011590512,0.000082363214,0.00021468732,0.0001249691,0.00011295536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017492319,0.000182142,0.00015477238,0.0003355615,0.000368755,0.00020137493,0.00016124237,0.00010536053,0.00033736724],"category_scores_gemma":[0.000031762036,0.00020515357,0.000057682064,0.0009736062,0.000034897574,0.0014025513,0.000031875235,0.0003765361,0.00005353133],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017080976,0.00014809202,0.00253536,0.00003067748,0.00012314421,0.000001187937,0.0040325643,0.29216635,0.019768279,0.025215069,0.025354138,0.63045436],"study_design_scores_gemma":[0.00086241256,0.00014959453,0.025267784,0.000041551713,0.00009210997,0.00015719634,0.01261653,0.6098071,0.004325099,0.0009482998,0.3448151,0.00091722177],"about_ca_topic_score_codex":0.00068548037,"about_ca_topic_score_gemma":0.000025767788,"teacher_disagreement_score":0.6295371,"about_ca_system_score_codex":0.00045036932,"about_ca_system_score_gemma":0.000053777785,"threshold_uncertainty_score":0.83659196},"labels":[],"label_agreement":null},{"id":"W4220678549","doi":"10.1061/9780784483978.068","title":"A Framework for Estimating the Reuse Value of In Situ Building Materials","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reuse; Demolition; Deconstruction (building); Raw material; Circular economy; Natural resource; Consumption (sociology); Environmental economics; Population; Production (economics); Work (physics); Building material; Sustainability; Business; Civil engineering; Engineering; Waste management; Mechanical engineering; Economics","score_opus":0.03695221047992209,"score_gpt":0.34200908174528605,"score_spread":0.30505687126536396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220678549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95296264,0.0002631621,0.04047789,0.00046428334,0.0044589876,0.0007445381,0.00009683841,0.00009882843,0.00043282952],"genre_scores_gemma":[0.9496798,0.00001946869,0.049247783,0.000011383336,0.00015265476,0.000821743,0.000012760061,0.000023941348,0.000030481027],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983162,0.00033037487,0.0003916035,0.00019434514,0.0004728626,0.00029458542],"domain_scores_gemma":[0.9985256,0.00079015153,0.00007694198,0.0003924082,0.00017852902,0.000036342757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016989874,0.0000996397,0.00017739626,0.00034957047,0.000442136,0.00007055609,0.00042033294,0.00006352821,0.00057574996],"category_scores_gemma":[0.0011326432,0.00009307332,0.00004987608,0.0007342832,0.00026130874,0.00012117643,0.00020084498,0.0006098,0.0000018481385],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001414537,0.000027865899,0.00122496,0.00019388081,0.00007578141,0.000005154302,0.00093924114,0.050402712,0.22420748,0.6376229,0.0023758395,0.082782745],"study_design_scores_gemma":[0.0015676237,0.0002219204,0.0011721445,0.00038600928,0.000032376694,0.0002614866,0.013235954,0.20216744,0.43272546,0.33591875,0.011772375,0.0005384522],"about_ca_topic_score_codex":0.00004298742,"about_ca_topic_score_gemma":0.00001061974,"teacher_disagreement_score":0.30170414,"about_ca_system_score_codex":0.00019269275,"about_ca_system_score_gemma":0.000089924666,"threshold_uncertainty_score":0.63040584},"labels":[],"label_agreement":null},{"id":"W4220683549","doi":"10.1061/9780784483961.068","title":"A Framework to Enhance Utilization of Automated Progress Measurements in Construction Projects","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Baseline (sea); Automation; Process (computing); Computer science; Work (physics); Systems engineering; Measure (data warehouse); Engineering; Data mining","score_opus":0.07787637593503761,"score_gpt":0.3790247827063963,"score_spread":0.3011484067713587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220683549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98284966,0.00088149915,0.004616298,0.0002904464,0.0051498446,0.0020558182,0.00009921308,0.0009730652,0.0030841597],"genre_scores_gemma":[0.9926933,0.000055905988,0.0058805696,0.000013906224,0.000062530016,0.0011598569,0.000036617523,0.000036136673,0.00006119068],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99666333,0.0005313746,0.0006005058,0.00042103845,0.0013184027,0.00046534694],"domain_scores_gemma":[0.99866277,0.000104874045,0.0001098283,0.00037012913,0.00063260057,0.00011980663],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011797353,0.00018909466,0.00027343983,0.0013501279,0.0003437611,0.00006851308,0.00030349093,0.00012242883,0.0010085396],"category_scores_gemma":[0.00029225662,0.00022534534,0.00005605132,0.003338168,0.00041982834,0.0002539515,0.00015008044,0.0008507762,0.000015415242],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006088217,0.0002889232,0.1359822,0.00053784956,0.00022867194,0.000020975845,0.00270085,0.027319742,0.03946041,0.040653132,0.007408551,0.7447899],"study_design_scores_gemma":[0.0044417977,0.0019223309,0.031599823,0.0016424039,0.00009458036,0.0009920263,0.046421774,0.3185555,0.5179335,0.019096736,0.054358207,0.0029413144],"about_ca_topic_score_codex":0.000044114793,"about_ca_topic_score_gemma":0.00005414538,"teacher_disagreement_score":0.7418486,"about_ca_system_score_codex":0.00058377447,"about_ca_system_score_gemma":0.0002458272,"threshold_uncertainty_score":0.9999047},"labels":[],"label_agreement":null},{"id":"W4220695606","doi":"10.36680/j.itcon.2022.013","title":"Evaluating the use of virtual reality for maintainability-focused design reviews","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Maintainability; Usability; Virtual reality; Engineering; Human–computer interaction; Computer science; Systems engineering; Reliability engineering; Software engineering","score_opus":0.07157249765784443,"score_gpt":0.3037117611674438,"score_spread":0.23213926350959938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220695606","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12847617,0.0001052019,0.869018,0.00082125317,0.0008779092,0.0006183421,0.000012307128,0.000047574074,0.000023186369],"genre_scores_gemma":[0.8767035,0.00013986681,0.12289739,0.000059806018,0.000040265633,0.00013961854,0.0000070831798,0.000007764733,0.0000047064473],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984226,0.00014383516,0.0011191618,0.0000408542,0.00017712831,0.00009642727],"domain_scores_gemma":[0.9986761,0.00017726158,0.00069620536,0.0001498452,0.00028809314,0.000012476906],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019026089,0.000078215795,0.00020228296,0.0005822009,0.00012425738,0.000019530244,0.00015234684,0.00008815829,0.000028890627],"category_scores_gemma":[0.0008141223,0.00006256391,0.00007823088,0.00056057994,0.00013051991,0.0007750756,0.000021722837,0.0003997557,5.9024904e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012391464,0.000008840501,0.00042167542,0.000033869055,0.000021056234,1.1475581e-7,0.00030644194,0.18425815,0.0010157145,0.032704886,0.0005955009,0.7805098],"study_design_scores_gemma":[0.004317306,0.0033672906,0.0010773673,0.0002112442,0.00016143944,0.0021624444,0.017049605,0.70860445,0.03148914,0.15622939,0.07483815,0.00049217686],"about_ca_topic_score_codex":0.000003532372,"about_ca_topic_score_gemma":0.0000016874192,"teacher_disagreement_score":0.7800177,"about_ca_system_score_codex":0.00028036832,"about_ca_system_score_gemma":0.00008950013,"threshold_uncertainty_score":0.2551282},"labels":[],"label_agreement":null},{"id":"W4220841884","doi":"10.1016/j.jclepro.2022.131290","title":"Economic sustainability benchmarking of modular homes: A life cycle thinking approach","year":2022,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Benchmarking; Sustainability; Benchmark (surveying); Modular design; Performance indicator; Environmental economics; Set (abstract data type); Computer science; Engineering; Process management; Business; Economics; Marketing","score_opus":0.005503446186944524,"score_gpt":0.19740071570632686,"score_spread":0.19189726951938235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220841884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9883589,0.0003809901,0.008202806,0.0002349338,0.0020335834,0.00011506903,0.0000018655462,0.000034790424,0.00063704577],"genre_scores_gemma":[0.9979629,0.000034348377,0.0012420078,0.000008545965,0.0006965129,0.0000065334166,0.000002956139,0.000014568535,0.00003162719],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899286,0.00007321188,0.00048496513,0.00011297923,0.00022843143,0.00010756958],"domain_scores_gemma":[0.9993949,0.000011388233,0.00026447081,0.00014975002,0.00013998247,0.00003951301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000795839,0.00008580111,0.00018959791,0.00020668998,0.00012310654,0.000020193176,0.00012262941,0.00003355704,0.00009763535],"category_scores_gemma":[0.00005242884,0.00008511095,0.00010690495,0.00012327037,0.000034595458,0.00034369048,0.000025423553,0.00033625375,4.3033165e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039167495,0.00003618354,0.0010969485,0.00008981322,0.000055559336,7.6866127e-7,0.00096580386,0.9672323,0.00081418036,0.0007166919,0.00058794976,0.02836463],"study_design_scores_gemma":[0.0026575646,0.0013157486,0.03756685,0.00013867731,0.00042687642,0.0032875864,0.07057803,0.7459806,0.020825962,0.061621074,0.05428873,0.0013122639],"about_ca_topic_score_codex":0.000012448144,"about_ca_topic_score_gemma":0.0000020349905,"teacher_disagreement_score":0.22125168,"about_ca_system_score_codex":0.00042748117,"about_ca_system_score_gemma":0.0001010853,"threshold_uncertainty_score":0.3470724},"labels":[],"label_agreement":null},{"id":"W4220876383","doi":"10.1061/9780784483978.031","title":"Machine Learning Framework to Predict Last Planner System Performance Metrics","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Computer science; Machine learning; Control (management); Artificial intelligence; Lean construction; Industrial engineering; Construction industry; Engineering; Construction engineering","score_opus":0.020761813411311954,"score_gpt":0.2685951538534851,"score_spread":0.24783334044217314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220876383","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.902082,0.0032804448,0.026164623,0.00045398707,0.021635758,0.0017078137,0.0004512423,0.0028938288,0.04133027],"genre_scores_gemma":[0.9968132,0.00013320569,0.0011332233,0.000017887667,0.00026506718,0.0005164025,0.000056256282,0.000047211564,0.0010175824],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99725246,0.000363584,0.00034329717,0.0003453652,0.001197545,0.0004977653],"domain_scores_gemma":[0.99889296,0.00022932245,0.000049160066,0.0003127257,0.00030845506,0.00020735794],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0010908224,0.00017756964,0.00020819328,0.0011053579,0.0012144458,0.00014454953,0.00035139392,0.000098614626,0.0017601765],"category_scores_gemma":[0.00022697108,0.00019404465,0.000061203784,0.002434453,0.00015041082,0.00020046286,0.00024374478,0.0020523034,0.0001301058],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030535582,0.000053386284,0.121780954,0.0005497866,0.00029038597,0.000068180176,0.00088596734,0.2839335,0.0015751981,0.08755029,0.020832427,0.48217458],"study_design_scores_gemma":[0.0006143596,0.0004224427,0.0015142516,0.00012981343,0.000021973156,0.0006801431,0.008852822,0.46364412,0.001716765,0.00021719582,0.52166885,0.0005172439],"about_ca_topic_score_codex":0.000025147703,"about_ca_topic_score_gemma":0.000008378161,"teacher_disagreement_score":0.50083643,"about_ca_system_score_codex":0.0006369189,"about_ca_system_score_gemma":0.000092582646,"threshold_uncertainty_score":0.99915236},"labels":[],"label_agreement":null},{"id":"W4220891812","doi":"10.1016/j.autcon.2022.104201","title":"Integrating off-site and on-site panelized construction schedules using fleet dispatching","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea","keywords":"Schedule; Factory (object-oriented programming); Truck; Bridge (graph theory); Discrete event simulation; Engineering; Transport engineering; Operations research; Fleet management; Computer science; Operations management; Simulation; Automotive engineering","score_opus":0.010102974649408082,"score_gpt":0.2246264265965721,"score_spread":0.21452345194716402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220891812","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9721918,0.00016816136,0.023688076,0.00007204013,0.002036526,0.00027062595,0.000041411295,0.00055043097,0.000980912],"genre_scores_gemma":[0.974337,0.000053273416,0.025258927,0.000041292406,0.000109088694,0.000078347955,0.00008195503,0.00003269313,0.000007412903],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983864,0.00020491464,0.0005549865,0.0003208198,0.00029973558,0.00023318424],"domain_scores_gemma":[0.9994288,0.000101274316,0.00017032099,0.00018302732,0.000059369926,0.000057219622],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00034286478,0.00023836577,0.00023869702,0.0005761035,0.0005500119,0.0001230051,0.000070528426,0.00010756141,0.00020788018],"category_scores_gemma":[0.00005145101,0.00027373078,0.0000572892,0.00057009794,0.00013003516,0.0005670087,0.000043808057,0.00059623667,0.000010460143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084530286,0.00003551941,0.07403216,0.00011232056,0.00006663409,0.0000066872885,0.002153244,0.116477884,0.031192048,0.100508384,0.000052085823,0.6752785],"study_design_scores_gemma":[0.0011510086,0.000058023048,0.010518606,0.00013576982,0.000033530676,0.00069279934,0.0061555984,0.97329384,0.002038775,0.0044645877,0.0010036363,0.00045383922],"about_ca_topic_score_codex":0.00011890805,"about_ca_topic_score_gemma":0.00007656291,"teacher_disagreement_score":0.85681593,"about_ca_system_score_codex":0.00039976038,"about_ca_system_score_gemma":0.00004471877,"threshold_uncertainty_score":0.9999715},"labels":[],"label_agreement":null},{"id":"W4220900789","doi":"10.1061/9780784483978.039","title":"Integrated DEMATEL and ANP-Based Framework to Model Construction Labor Productivity","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Process (computing); Computer science; Analytic network process; Subjectivity; Quality (philosophy); Decision support system; Risk analysis (engineering); Management science; Knowledge management; Industrial engineering; Operations research; Engineering; Artificial intelligence; Business; Economics","score_opus":0.028657043361318663,"score_gpt":0.297533011739239,"score_spread":0.2688759683779204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220900789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91836274,0.0006808528,0.068890706,0.0020084798,0.004849868,0.0013599808,0.0005085365,0.0009591928,0.0023796363],"genre_scores_gemma":[0.9728913,0.00006392534,0.025302364,0.00010455422,0.0001661793,0.0009935759,0.000061091036,0.00006543307,0.0003516205],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99704057,0.0004401287,0.0004058905,0.0006208752,0.0009395144,0.00055299426],"domain_scores_gemma":[0.9983393,0.00019227537,0.000064071995,0.00048450634,0.00064699975,0.00027287233],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001057366,0.00026766444,0.00029469322,0.00092340994,0.0010541161,0.00020377686,0.00027219224,0.00014807195,0.0009529649],"category_scores_gemma":[0.00039714313,0.00029819953,0.000061994375,0.0019930934,0.00065180793,0.0003166496,0.00018389203,0.0015992139,0.000024870975],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055160106,0.00012722783,0.011569691,0.00027247894,0.00019932009,0.00002857911,0.00078108825,0.2005619,0.03142017,0.18400598,0.011102801,0.55937916],"study_design_scores_gemma":[0.0014288408,0.00038572482,0.001452919,0.00014258087,0.00005211007,0.0006634188,0.0088616945,0.851673,0.024857685,0.036312114,0.07298035,0.001189543],"about_ca_topic_score_codex":0.0000424025,"about_ca_topic_score_gemma":0.000036674344,"teacher_disagreement_score":0.6511111,"about_ca_system_score_codex":0.00047357744,"about_ca_system_score_gemma":0.00034639577,"threshold_uncertainty_score":0.9999603},"labels":[],"label_agreement":null},{"id":"W4220955353","doi":"10.1080/23744731.2022.2052668","title":"A methodology to integrate maintenance management systems and BIM to improve building management","year":2022,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Workflow; Interoperability; Facility management; Computer science; Context (archaeology); Process (computing); Building information modeling; Data management; Process management; Systems engineering; Engineering; Database; Scheduling (production processes); Operations management","score_opus":0.0140295200681891,"score_gpt":0.2316001002445175,"score_spread":0.21757058017632838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220955353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29653418,0.0010181116,0.6896772,0.0075030215,0.0015559248,0.0026629507,0.000030581316,0.0002628749,0.0007551625],"genre_scores_gemma":[0.9597632,0.00027581624,0.036724105,0.00020796654,0.000014899385,0.0023943367,5.0819074e-7,0.000012961471,0.0006061649],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990333,0.000012853771,0.00014591705,0.00034514166,0.0001730317,0.00028979924],"domain_scores_gemma":[0.9995893,0.000026634892,0.00002443738,0.00029623657,0.000010901069,0.00005249137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008426936,0.00011318522,0.00011023386,0.00037961054,0.00048351128,0.00003878061,0.00035867246,0.000030104924,0.0000072354997],"category_scores_gemma":[0.000011793849,0.000086409826,0.000014140638,0.0004770518,0.00027645886,0.00004916378,0.0005006219,0.0001152508,0.000004444961],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001652037,0.0000121615,0.000064182124,0.000041417417,0.000056968292,0.000003484975,0.00013613068,0.009883307,0.03316131,0.42817786,0.0005779679,0.5278687],"study_design_scores_gemma":[0.0009510995,0.0007325807,0.0014887917,0.00005432171,0.0001442136,0.00018983214,0.023359947,0.054954574,0.02094811,0.0434842,0.85302156,0.00067075907],"about_ca_topic_score_codex":0.000009601884,"about_ca_topic_score_gemma":0.0000023556313,"teacher_disagreement_score":0.8524436,"about_ca_system_score_codex":0.00019281628,"about_ca_system_score_gemma":0.0000042424435,"threshold_uncertainty_score":0.37188268},"labels":[],"label_agreement":null},{"id":"W4220957888","doi":"10.1111/cgf.14275","title":"Issue Information","year":2022,"lang":"en","type":"paratext","venue":"Computer Graphics Forum","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; University of Toronto; Simon Fraser University","funders":"","keywords":"Computer science; Citation; Graphics; Information retrieval; World Wide Web; Computer graphics (images)","score_opus":0.0055985584128917226,"score_gpt":0.19670507342689056,"score_spread":0.19110651501399883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220957888","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00012437512,0.002687619,0.5694216,0.0003946608,0.108210415,0.00055399234,0.00052143843,0.0008884834,0.3171974],"genre_scores_gemma":[0.1463486,0.052059136,0.039621823,0.05232562,0.05280219,0.005696517,0.14914376,0.0026851355,0.49931723],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99910617,0.000018128474,0.00031723734,0.00012177533,0.0002125414,0.00022417655],"domain_scores_gemma":[0.99953556,0.000015492999,0.000070412156,0.00026433816,0.00006336838,0.000050850085],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000049403243,0.00023531335,0.0002023106,0.0004332407,0.00014685135,0.0001286148,0.00024265755,0.00024733195,0.0056606266],"category_scores_gemma":[9.59705e-7,0.00025860066,0.0001356384,0.00033303525,0.000031526695,0.00034597883,0.00007781927,0.00063148816,0.0056910394],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014025321,0.0000028252953,0.0000051412194,0.00008298375,0.000046725916,3.0754452e-7,0.000068428024,0.0038804223,6.25948e-7,0.011564081,0.9341623,0.05018475],"study_design_scores_gemma":[0.000104368046,0.000029547553,0.000011355199,0.00002204921,0.000010538371,0.000014096233,0.000030565505,0.061691877,0.000020102903,0.00036315038,0.9374492,0.00025315036],"about_ca_topic_score_codex":0.000010937202,"about_ca_topic_score_gemma":0.0000050980834,"teacher_disagreement_score":0.52979976,"about_ca_system_score_codex":0.00006565611,"about_ca_system_score_gemma":0.000030753956,"threshold_uncertainty_score":0.99998665},"labels":[],"label_agreement":null},{"id":"W4220981506","doi":"10.1061/9780784483961.092","title":"Framework for Simulating Crew Motivation Impact on Productivity—A Hybrid Modeling Approach","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Productivity; Dynamism; Computer science; Fuzzy logic; Track (disk drive); Identification (biology); Industrial engineering; Industrial organization; Business; Engineering; Artificial intelligence; Economics","score_opus":0.0757413966445981,"score_gpt":0.34700515897443446,"score_spread":0.27126376232983634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220981506","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66220963,0.00026171326,0.33038712,0.00014561253,0.002658531,0.0013523116,0.00017977088,0.00047389403,0.0023314294],"genre_scores_gemma":[0.9916352,0.000016082866,0.006466036,0.000013214566,0.00046414617,0.0010708547,0.00013606143,0.00006368285,0.00013469679],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973722,0.0003059892,0.00036986708,0.0005121023,0.00091137306,0.0005284565],"domain_scores_gemma":[0.99842626,0.00050877046,0.00007213978,0.00042145394,0.0004550459,0.000116359835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012526657,0.00022816402,0.00024163787,0.0006442881,0.0012325604,0.00016836972,0.00025329733,0.0000813268,0.00056062185],"category_scores_gemma":[0.00067918655,0.00023632904,0.0001499403,0.00085848017,0.00015398672,0.00032481202,0.000098717304,0.001364812,0.000007171298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014877546,0.00004573276,0.00061482005,0.00006601167,0.000078381534,0.0000013660489,0.00012633255,0.8717488,0.0009967738,0.0394813,0.0008722067,0.085819505],"study_design_scores_gemma":[0.00040404464,0.00017388763,0.00007129978,0.000027172478,0.000010141011,0.000069091,0.001478947,0.97260475,0.0017146353,0.021644479,0.0015526332,0.00024893307],"about_ca_topic_score_codex":0.000021031292,"about_ca_topic_score_gemma":8.397848e-7,"teacher_disagreement_score":0.3294256,"about_ca_system_score_codex":0.000662126,"about_ca_system_score_gemma":0.00014241596,"threshold_uncertainty_score":0.9637219},"labels":[],"label_agreement":null},{"id":"W4220989846","doi":"10.1061/9780784483954.003","title":"Transitioning to the Next Era of Modular Construction: Reconfiguration, Reuse, and Building Stock Agility","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular design; Agile software development; Reuse; Control reconfiguration; Architectural engineering; Process (computing); Stock (firearms); Engineering; Asset (computer security); Computer science; Systems engineering; Construction engineering; Process management; Business; Software engineering; Computer security; Mechanical engineering","score_opus":0.03765020142108328,"score_gpt":0.2915060947260926,"score_spread":0.25385589330500935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220989846","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9755003,0.0011940423,0.013485745,0.0034114812,0.0033183612,0.0009319808,0.00015684136,0.00021664138,0.0017846375],"genre_scores_gemma":[0.99510604,0.00017854768,0.00395526,0.000044944154,0.00016428952,0.0004077515,0.000025049449,0.00002674704,0.00009137758],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975352,0.00049961114,0.0004979454,0.00037523173,0.0007598823,0.0003320847],"domain_scores_gemma":[0.99846405,0.00019840352,0.00007975948,0.0005675537,0.0005576053,0.0001326446],"candidate_categories":["sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0012976511,0.00016715,0.00022647683,0.0003539034,0.0013156041,0.00015854074,0.00036281976,0.000075300384,0.001561431],"category_scores_gemma":[0.0002218755,0.00016635148,0.00006972313,0.0012093809,0.0005907559,0.0003800619,0.0001637316,0.0011873365,0.0000056755516],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022633272,0.000040305033,0.0035693806,0.0001749955,0.0002468725,0.0000102565555,0.00241094,0.04628125,0.08529744,0.09945855,0.00965819,0.75262547],"study_design_scores_gemma":[0.0042620352,0.0011321006,0.014718487,0.00040944584,0.0001819071,0.004776241,0.07326561,0.24280271,0.11172184,0.04046392,0.5041119,0.002153824],"about_ca_topic_score_codex":0.000079443686,"about_ca_topic_score_gemma":0.000047069436,"teacher_disagreement_score":0.75047165,"about_ca_system_score_codex":0.00021745406,"about_ca_system_score_gemma":0.00014365384,"threshold_uncertainty_score":0.99998456},"labels":[],"label_agreement":null},{"id":"W4221017932","doi":"10.18280/ria.360113","title":"An Effective Optimization of Time and Cost Estimation for Prefabrication Construction Management Using Artificial Neural Networks","year":2022,"lang":"en","type":"article","venue":"Revue d intelligence artificielle","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Procurement; Process (computing); Artificial neural network; Cost estimate; Key (lock); Industrial engineering; Engineering; Computer science; Operations research; Construction engineering; Systems engineering; Artificial intelligence; Civil engineering; Business","score_opus":0.01584629501571994,"score_gpt":0.24403591710165037,"score_spread":0.22818962208593044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221017932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.070407666,0.000063470805,0.9281024,0.000013413269,0.00035193114,0.0008236265,0.000016582795,0.00008183151,0.00013908221],"genre_scores_gemma":[0.9753773,0.000015290534,0.024211034,0.0000056589697,0.000047706835,0.00020833492,0.00010511872,0.000016799655,0.000012724189],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928254,0.00004776306,0.00029735165,0.00017613999,0.00008197853,0.00011420535],"domain_scores_gemma":[0.9996245,0.00004568699,0.00009479139,0.00013599591,0.00006893417,0.000030082714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018145195,0.00009455636,0.00011159359,0.00012391742,0.00021274976,0.00003168775,0.00006313501,0.00003831486,0.00007463507],"category_scores_gemma":[0.000008410774,0.000114743765,0.00003285459,0.00026670686,0.000054016116,0.00019978073,0.000016085198,0.00008044171,0.0000010979956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025369769,0.000019086274,0.000019873503,0.000028804128,0.000010522135,1.10868605e-7,0.000107043816,0.75115705,0.0019078907,0.003924577,0.0000050445683,0.24279463],"study_design_scores_gemma":[0.000041224142,0.00009638342,0.000020886137,0.000012300819,0.00003596725,0.000020741052,0.00048217553,0.9893812,0.0089108655,0.0008612484,0.000031171247,0.000105832856],"about_ca_topic_score_codex":0.0000071589934,"about_ca_topic_score_gemma":0.0000013854266,"teacher_disagreement_score":0.9049697,"about_ca_system_score_codex":0.00009086272,"about_ca_system_score_gemma":0.0000041407757,"threshold_uncertainty_score":0.4679115},"labels":[],"label_agreement":null},{"id":"W4221072189","doi":"10.3390/buildings12040390","title":"Barriers, Strategies, and Best Practices for BIM Adoption in Quebec Prefabrication Small and Medium-Sized Enterprises (SMEs)","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Best practice; Building information modeling; Stakeholder; Business; Work (physics); Small and medium-sized enterprises; Process management; Knowledge management; Engineering; Operations management; Computer science; Civil engineering; Public relations; Management","score_opus":0.01675846535763414,"score_gpt":0.24400956279689415,"score_spread":0.22725109743926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221072189","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9871061,0.0010085589,0.010342843,0.00041191283,0.00025788075,0.00031720113,0.00001548518,0.00009425909,0.00044578276],"genre_scores_gemma":[0.99623734,0.00028950797,0.0029711598,0.00002736052,0.00004854027,0.00024176057,0.000017745373,0.000013065416,0.00015354803],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950004,0.0000235194,0.00015380296,0.00014905904,0.000073504176,0.000100074096],"domain_scores_gemma":[0.9997162,0.00006651518,0.00008838204,0.00006241941,0.000026209633,0.000040254155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001525562,0.00008431767,0.00008837818,0.00010774314,0.000107463595,0.0001238738,0.000050094222,0.00004135997,0.000034832825],"category_scores_gemma":[0.0000626384,0.00009147397,0.000014543884,0.000110865774,0.000027932027,0.00046736374,0.000022267186,0.00011245357,3.7042233e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008131807,0.00016060773,0.062105864,0.0011647068,0.00023134351,0.0000073311676,0.011505725,0.008746159,0.17901988,0.12134104,0.0034838894,0.6114203],"study_design_scores_gemma":[0.0066194735,0.00084594684,0.041198317,0.00025967948,0.0002894639,0.00021536207,0.0888258,0.0755222,0.012552215,0.011009336,0.7610787,0.0015835],"about_ca_topic_score_codex":0.0028266662,"about_ca_topic_score_gemma":0.0033337914,"teacher_disagreement_score":0.7575948,"about_ca_system_score_codex":0.000086431406,"about_ca_system_score_gemma":0.00006873001,"threshold_uncertainty_score":0.42730924},"labels":[],"label_agreement":null},{"id":"W4223627082","doi":"10.1016/j.dibe.2022.100075","title":"Development of quality improvement procedures and tools for facility management BIM","year":2022,"lang":"en","type":"article","venue":"Developments in the Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Mitacs","keywords":"Building information modeling; Maintainability; Facility management; Quality (philosophy); Checklist; Systems engineering; Process (computing); Interoperability; Process management; Quality assurance; Computer science; Documentation; Quality function deployment; Engineering; Engineering management; Construction engineering; Risk analysis (engineering); Software engineering; Operations management","score_opus":0.023807002306515425,"score_gpt":0.23523993505536686,"score_spread":0.21143293274885144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4223627082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98817575,0.00012360676,0.00954483,0.000065729044,0.00016374643,0.0010722759,0.00004659556,0.000028990842,0.0007784714],"genre_scores_gemma":[0.97469336,0.00006176125,0.023241822,0.00008515352,0.000004813015,0.0017800465,0.000054164862,0.000007956531,0.00007090065],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988243,0.00003107231,0.00045963933,0.00019331122,0.00031972025,0.00017193967],"domain_scores_gemma":[0.9997055,0.00004154719,0.00005805524,0.00016857708,0.0000046289524,0.000021704436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062633125,0.00013297751,0.00012938675,0.00006981853,0.00016175216,0.000023542148,0.00018785642,0.00002360835,0.00006563621],"category_scores_gemma":[0.000009165716,0.00011369229,0.000024280906,0.000074365256,0.000033878765,0.000080790844,0.00012802346,0.00008817504,0.0000029845623],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005540433,0.00017905007,0.002284384,0.00042082794,0.0001468004,8.1700836e-7,0.0067037344,0.0031728777,0.004739876,0.005425069,0.00018722925,0.9766839],"study_design_scores_gemma":[0.0032169998,0.00014697494,0.4219584,0.000052838303,0.000049517985,0.000013373189,0.045379817,0.0006128594,0.035684977,0.0040114936,0.48781416,0.0010585868],"about_ca_topic_score_codex":0.0000030015892,"about_ca_topic_score_gemma":0.000010408137,"teacher_disagreement_score":0.97562534,"about_ca_system_score_codex":0.0002660465,"about_ca_system_score_gemma":0.00002343661,"threshold_uncertainty_score":0.4636237},"labels":[],"label_agreement":null},{"id":"W4224117591","doi":"10.1061/9780784484180.036","title":"An Overview of the Upcoming ASCE Report on Design of Modular Structures for Industrial Facilities","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dow Chemical (Canada)","funders":"","keywords":"Modular programming; Modular design; Engineering; Task (project management); Construction engineering; Engineering management; Prefabrication; Manufacturing engineering; Systems engineering; Architectural engineering; Civil engineering; Computer science","score_opus":0.09646837664802987,"score_gpt":0.27292426223225863,"score_spread":0.17645588558422876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224117591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8814817,0.00031374322,0.112844184,0.00006703798,0.0020624294,0.0008035148,0.00015659884,0.00012180956,0.0021489523],"genre_scores_gemma":[0.9987421,0.0000030129693,0.0009046173,0.00000920852,0.00003321571,0.000031641903,0.000004143014,0.000005871419,0.00026621245],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99953526,0.00003548852,0.00019233029,0.00006267127,0.0001241714,0.00005008274],"domain_scores_gemma":[0.99971277,0.000032419477,0.00004864353,0.00017110554,0.000026027734,0.000009030406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013910589,0.0000512575,0.00008983966,0.000030646104,0.000053533044,0.000004897865,0.000085569154,0.000030451716,0.000261439],"category_scores_gemma":[0.000024832796,0.000037548205,0.000048671987,0.000066580455,0.000018071954,0.000039198854,0.000009828141,0.00008019817,4.748271e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056894056,0.000015397458,0.00039996475,0.000076392804,0.000060960116,4.7842434e-7,0.00044462227,0.85451764,0.02094001,0.098226994,0.0018662105,0.023394408],"study_design_scores_gemma":[0.0016215469,0.0007147967,0.002610632,0.00006406675,0.000089379,0.000112930225,0.006684178,0.26966414,0.63895845,0.039093897,0.03990784,0.00047811176],"about_ca_topic_score_codex":0.00003940769,"about_ca_topic_score_gemma":0.0000037310595,"teacher_disagreement_score":0.61801845,"about_ca_system_score_codex":0.000024473406,"about_ca_system_score_gemma":0.000024217237,"threshold_uncertainty_score":0.2862574},"labels":[],"label_agreement":null},{"id":"W4224210734","doi":"10.36680/j.itcon.2022.022","title":"Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Istanbul Teknik Üniversitesi; Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Facility management; Building information modeling; Software deployment; Occupancy; Process (computing); Post-occupancy evaluation; Systems engineering; Resource (disambiguation); System deployment; Engineering; Computer science; Architectural engineering; Process management; Software engineering; Operations management","score_opus":0.005306839171041152,"score_gpt":0.2184612841904609,"score_spread":0.21315444501941974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224210734","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6565511,0.00030111868,0.33570498,0.0006702144,0.005219773,0.00068064674,0.000052632287,0.00035237783,0.00046713848],"genre_scores_gemma":[0.98367816,0.000024524765,0.016060082,0.000025691903,0.000051729323,0.00010105363,0.00004573241,0.000010214902,0.0000028061045],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984739,0.000049529226,0.0009394244,0.00006796352,0.00031321176,0.00015596625],"domain_scores_gemma":[0.998295,0.000043059863,0.000581271,0.00011862753,0.0009342772,0.000027779728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088190765,0.00013123339,0.00021982433,0.0020189339,0.00016702065,0.0000470361,0.00018044618,0.00019535329,0.00006199113],"category_scores_gemma":[0.0001863493,0.00013357974,0.000077530654,0.0010560661,0.00006397578,0.0011513352,0.00001985536,0.0005996504,0.000004613443],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036345262,0.000023259405,0.0017149117,0.00013640252,0.00010625519,0.0000016713287,0.0004146649,0.07178172,0.006240464,0.09958822,0.0011451166,0.8184839],"study_design_scores_gemma":[0.013099193,0.0017170177,0.0019214178,0.0006931111,0.00039353038,0.013857687,0.18310227,0.5878465,0.10296373,0.022713806,0.07039221,0.0012995214],"about_ca_topic_score_codex":0.0000057072953,"about_ca_topic_score_gemma":0.000004032797,"teacher_disagreement_score":0.8171843,"about_ca_system_score_codex":0.0009844338,"about_ca_system_score_gemma":0.00019283647,"threshold_uncertainty_score":0.5447224},"labels":[],"label_agreement":null},{"id":"W4224434769","doi":"10.18280/ijsdp.170228","title":"Monitoring the Construction Industry Towards a Construction Revolution 4.0","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Dashboard; Key (lock); Productivity; Industry 4.0; Construction industry; Construction management; Engineering; Process management; Business; Environmental economics; Computer science; Construction engineering; Data science; Civil engineering; Computer security","score_opus":0.011547741599606141,"score_gpt":0.22898601087997245,"score_spread":0.2174382692803663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224434769","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9880767,0.0010470363,0.0056149755,0.00027252434,0.0035025042,0.00006408334,0.0000016440057,0.000035395107,0.0013851415],"genre_scores_gemma":[0.99565035,0.000057525434,0.0036767721,0.000019752026,0.00041371712,0.000013346371,0.0000037250938,0.000008116701,0.00015668232],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99906707,0.000032526943,0.0003326561,0.00006629475,0.00037133417,0.00013013207],"domain_scores_gemma":[0.9994108,0.000026302903,0.00015585091,0.00003629868,0.00033393616,0.000036824742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036910945,0.000088273606,0.00008908948,0.0002741249,0.00032830492,0.0000926098,0.00014857638,0.00005656125,0.000057877096],"category_scores_gemma":[0.000033807493,0.00007627168,0.000029853245,0.0001654198,0.000046117315,0.00033553058,0.000053308508,0.00056361035,4.6433328e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030608274,0.000034790264,0.1086283,0.00007442385,0.0008104528,0.0006716579,0.01870188,0.065863535,0.0009214831,0.029483514,0.002552192,0.7719517],"study_design_scores_gemma":[0.0018587676,0.00012161078,0.08599561,0.00029273418,0.000079594625,0.01078761,0.5972704,0.004228248,0.011372311,0.00679138,0.2805796,0.0006221191],"about_ca_topic_score_codex":0.000007120338,"about_ca_topic_score_gemma":1.713681e-7,"teacher_disagreement_score":0.7713296,"about_ca_system_score_codex":0.00039139445,"about_ca_system_score_gemma":0.00015296206,"threshold_uncertainty_score":0.31102687},"labels":[],"label_agreement":null},{"id":"W4224920910","doi":"10.18280/ijdne.170210","title":"Constraint-Based Design Formation - A Case Study of Wind Effects on High-Rise Building Designs","year":2022,"lang":"en","type":"article","venue":"International Journal of Design & Nature and Ecodynamics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Constraint (computer-aided design); Process (computing); Engineering design process; Design process; Computer science; Control (management); Industrial engineering; Systems engineering; Engineering; Artificial intelligence; Work in process; Mechanical engineering; Operations management","score_opus":0.011257823974884361,"score_gpt":0.23846209133054933,"score_spread":0.22720426735566496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224920910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62240475,0.00014996371,0.37616375,0.000044861874,0.0009924173,0.00019569581,0.000012104323,0.000017630131,0.000018851235],"genre_scores_gemma":[0.9904786,0.000017903121,0.009300334,0.00006284887,0.00010646877,0.000009473104,0.000004217523,0.000017024617,0.0000031810453],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872833,0.00018564233,0.00045438803,0.000097748416,0.00042767977,0.00010618684],"domain_scores_gemma":[0.9989636,0.00039342252,0.0002764932,0.00007799068,0.00023392856,0.00005455048],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050198054,0.00014459292,0.00019872439,0.00050585804,0.00010563816,0.00005191584,0.00018013551,0.000093076014,0.000021623471],"category_scores_gemma":[0.00005114593,0.00013727663,0.00006553709,0.00015556076,0.000024093477,0.00025481687,0.000017941853,0.00062628073,3.3804227e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048523973,0.00024377681,0.0002113135,0.000034393026,0.0003606609,0.0014582705,0.000989939,0.9405912,0.0097023565,0.001718922,0.0002959208,0.04390798],"study_design_scores_gemma":[0.005458467,0.0036513282,0.0003541632,0.00018140023,0.0002265733,0.012906805,0.005116499,0.9549223,0.013786503,0.002839743,0.00015601957,0.00040018375],"about_ca_topic_score_codex":0.00001026237,"about_ca_topic_score_gemma":0.000007591893,"teacher_disagreement_score":0.36807382,"about_ca_system_score_codex":0.00021226367,"about_ca_system_score_gemma":0.000062552645,"threshold_uncertainty_score":0.5597979},"labels":[],"label_agreement":null},{"id":"W4224983266","doi":"10.18280/mmep.090207","title":"Investigating the Optimal Design Variables of Concrete Slabs with Impact Resistance by Development a Multi-Objective Model to Save Cost-Time of Construction","year":2022,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Deflection (physics); Slab; Minification; Structural engineering; Total cost; Engineering; Computer science; Mathematical optimization; Mathematics","score_opus":0.02093996832522581,"score_gpt":0.2020222355901973,"score_spread":0.18108226726497148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224983266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1265103,0.00012602963,0.87283146,0.0000115930725,0.000017588382,0.0003516659,0.000020371048,0.000076925324,0.00005407947],"genre_scores_gemma":[0.5533936,0.0000036123618,0.44640842,0.0000024396252,0.000003243563,0.00013940797,0.0000033681392,0.00002056187,0.000025349244],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911976,0.000021789967,0.00034920388,0.00014424494,0.00019013058,0.00017486073],"domain_scores_gemma":[0.9995666,0.00012327086,0.00006640582,0.00011394066,0.00006355906,0.00006621836],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032527032,0.00016393857,0.00024180714,0.00007046593,0.00010242413,0.00002076701,0.00008515191,0.000040548282,0.000009415884],"category_scores_gemma":[0.000020328403,0.00012454431,0.000026841857,0.00019941194,0.000058914175,0.0000645072,0.00002659096,0.00018656338,5.1134646e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012741001,0.000003708126,0.0000037409907,0.00018490397,0.00006596896,7.816962e-8,0.0031403098,0.974839,0.019212058,0.0023518284,0.000017648546,0.0001680627],"study_design_scores_gemma":[0.00020297292,0.00004721898,0.0000010563775,0.00019121196,0.000021900172,0.000014089887,0.00021737315,0.98612714,0.012288103,0.0007226759,0.000019298399,0.00014693681],"about_ca_topic_score_codex":0.0000056395884,"about_ca_topic_score_gemma":2.338309e-7,"teacher_disagreement_score":0.4268833,"about_ca_system_score_codex":0.00007691362,"about_ca_system_score_gemma":0.00004424205,"threshold_uncertainty_score":0.507877},"labels":[],"label_agreement":null},{"id":"W4225088704","doi":"10.36680/j.itcon.2022.007","title":"A simulation-based statistical method for planning modular construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workstation; Modular design; Process (computing); Engineering; Production line; Crew; Wafer fabrication; Production (economics); Reliability engineering; Industrial engineering; Computer science; Mechanical engineering; Operating system","score_opus":0.007430963568854501,"score_gpt":0.2555881924478268,"score_spread":0.24815722887897232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225088704","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.064563125,0.00003976923,0.93340105,0.00019349925,0.0013291856,0.00020403472,0.000036427406,0.00013219666,0.00010074035],"genre_scores_gemma":[0.7038039,0.0000022772535,0.29606703,0.000029759245,0.000036352863,0.000030612235,0.000021747866,0.0000075869607,7.6138707e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865156,0.000040535633,0.0008566421,0.00007012637,0.0002242348,0.00015690875],"domain_scores_gemma":[0.99902856,0.00025597116,0.00040732027,0.00009778228,0.00017900726,0.000031384203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042045215,0.0001223905,0.00021395001,0.0013011291,0.00017721538,0.00003630546,0.00012249144,0.0001447815,0.00008151223],"category_scores_gemma":[0.00017962846,0.00013517207,0.00006405786,0.00038058715,0.00007951299,0.0006952195,0.000014458089,0.00052130653,0.0000014372248],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005866385,0.0000053849662,0.00061861996,0.00002526819,0.00002071662,0.000001173187,0.000090017966,0.79233605,0.0001984299,0.011848039,0.00003202894,0.19476561],"study_design_scores_gemma":[0.0011906623,0.00013115654,0.0001825045,0.000026800974,0.000023171631,0.00037657187,0.0035333075,0.9585935,0.009655838,0.021781402,0.0043650684,0.00014002196],"about_ca_topic_score_codex":0.0000019930856,"about_ca_topic_score_gemma":5.92238e-7,"teacher_disagreement_score":0.63924074,"about_ca_system_score_codex":0.0003618847,"about_ca_system_score_gemma":0.000087000444,"threshold_uncertainty_score":0.5512157},"labels":[],"label_agreement":null},{"id":"W4225296624","doi":"10.36834/cmej.75247","title":"Arscience 2.0","year":2022,"lang":"en","type":"article","venue":"Canadian Medical Education Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science","score_opus":0.004741862397707122,"score_gpt":0.21448261253930243,"score_spread":0.2097407501415953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225296624","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35234854,0.0057761157,0.006650021,0.10702592,0.09482004,0.00033172383,0.00003338688,0.00035638775,0.43265787],"genre_scores_gemma":[0.990192,0.000029584287,0.0001812234,0.008470054,0.00046763304,0.00001766091,0.0000037076893,0.0000064676974,0.00063165306],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993953,0.000021719701,0.00010886592,0.000043213942,0.00030193158,0.00012895223],"domain_scores_gemma":[0.99769324,0.0000052774108,0.000012449149,0.00004885072,0.000041639516,0.0021985646],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00021657502,0.000034581048,0.000032417243,0.00016389089,0.00032302624,0.00003637625,0.00014924718,0.000024689387,0.086636744],"category_scores_gemma":[0.00036962447,0.000036089754,0.000018896613,0.00019756291,0.000029627967,0.000071851704,0.0000037823652,0.0004370219,0.00003512276],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[4.1693394e-7,0.000008091471,0.00023053867,0.0000019555268,0.000004561423,0.000009005185,0.0003538458,0.0005627944,0.000019986699,0.010533957,0.50821406,0.48006076],"study_design_scores_gemma":[0.00004708639,0.000007766954,0.0005064142,0.000004716686,0.0000016251319,0.0016972877,0.0011687214,0.004056404,0.000008024787,0.0010272836,0.9914193,0.000055353492],"about_ca_topic_score_codex":0.00063368917,"about_ca_topic_score_gemma":0.002807197,"teacher_disagreement_score":0.6378435,"about_ca_system_score_codex":0.00036411456,"about_ca_system_score_gemma":0.012532822,"threshold_uncertainty_score":0.9930652},"labels":[],"label_agreement":null},{"id":"W4226047702","doi":"10.1016/j.procs.2022.01.310","title":"Modular Robotic Prefabrication of Discrete Aggregations Driven by BIM and Computational Design","year":2022,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Mitacs","keywords":"Prefabrication; Modular design; Computer science; Adaptability; Process (computing); Architecture; Design process; Engineering design process; Systems engineering; Distributed computing; Work in process; Engineering; Operating system","score_opus":0.008630916063125722,"score_gpt":0.19822316044246377,"score_spread":0.18959224437933805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226047702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038031477,0.00013548892,0.9612777,0.000087844695,0.00021578129,0.0001303789,0.0000050717445,0.00007245605,0.000043760836],"genre_scores_gemma":[0.901635,0.0000068065956,0.09826353,0.000018420451,0.000022140139,0.000035528014,0.000008901333,0.0000044519575,0.0000052151595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993561,0.000015123902,0.00013355719,0.00015652958,0.00024538444,0.00009330254],"domain_scores_gemma":[0.9997308,0.000029178998,0.000043222575,0.000076383665,0.000080382306,0.000040013892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012391506,0.000058827256,0.0000634005,0.00011386712,0.00020120972,0.000039573162,0.0001562223,0.000010674303,0.000008898923],"category_scores_gemma":[0.0000072790062,0.00006176237,0.000011832471,0.0004874734,0.00014212419,0.0002631338,0.000056462788,0.00006628043,0.0000011476162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.34543e-7,0.000007598074,0.0003995147,0.000011094394,0.0000036605413,7.766511e-8,0.00028106177,0.97651744,0.004362247,0.004872395,0.00015101589,0.013392988],"study_design_scores_gemma":[0.00007478942,0.000035534296,0.0029781936,0.000005296658,0.0000040359632,0.000013731229,0.000017170245,0.9923175,0.0015185329,0.002910477,0.00005700473,0.00006774761],"about_ca_topic_score_codex":0.0000022056543,"about_ca_topic_score_gemma":2.1094083e-7,"teacher_disagreement_score":0.86360353,"about_ca_system_score_codex":0.000046604688,"about_ca_system_score_gemma":0.000057987414,"threshold_uncertainty_score":0.25185964},"labels":[],"label_agreement":null},{"id":"W4226396538","doi":"10.2139/ssrn.4083982","title":"Integrated Framework of Knowledge-Based Decision Support System for User-Centered Residential Design","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Decision support system; Computer science; Knowledge management; User-centered design; Human–computer interaction; Process management; Engineering; Artificial intelligence","score_opus":0.011068348169527592,"score_gpt":0.2353176399110334,"score_spread":0.22424929174150582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226396538","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039064858,0.000874365,0.95792896,0.000022010612,0.0016430469,0.00023001368,0.00001809918,0.000105928135,0.00011273873],"genre_scores_gemma":[0.99342215,0.00006895426,0.006111671,0.0000060461857,0.00014915933,0.000056403136,0.000016373886,0.000037173522,0.00013205079],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832094,0.00011315389,0.00045302484,0.00012939023,0.00022600801,0.0007574653],"domain_scores_gemma":[0.99937475,0.00014548625,0.0001233421,0.00014209532,0.00016405426,0.000050266877],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011198713,0.0001404694,0.00020190596,0.00024525853,0.00023905426,0.000034503297,0.0002449156,0.00008331328,0.00011024573],"category_scores_gemma":[0.00005264767,0.00013538086,0.00015970557,0.00029805506,0.000020309226,0.00009446277,0.000015569329,0.0011769683,0.0000071602494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004021039,0.00035679396,0.0013218293,0.00030941234,0.0011532673,0.000011842655,0.00081859995,0.18677703,0.020543452,0.38285747,0.011255604,0.39057365],"study_design_scores_gemma":[0.015028331,0.007292713,0.0004827135,0.0011225049,0.0007679193,0.003582045,0.027047528,0.527163,0.07986223,0.28398448,0.05163841,0.0020281146],"about_ca_topic_score_codex":0.000007911203,"about_ca_topic_score_gemma":0.000068739166,"teacher_disagreement_score":0.9543573,"about_ca_system_score_codex":0.0014867957,"about_ca_system_score_gemma":0.001407128,"threshold_uncertainty_score":0.5520671},"labels":[],"label_agreement":null},{"id":"W4229557843","doi":"10.29173/mocs245","title":"Estimation Formulas for Embedded-length of Connection Embedded-type Foundation Unit Modular System","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Connection (principal bundle); Embedment; Column (typography); Unit (ring theory); Structural engineering; Foundation (evidence); Engineering; Computer science; Mathematics","score_opus":0.01889241507092315,"score_gpt":0.22775456898491067,"score_spread":0.20886215391398752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229557843","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7746352,0.000186678,0.22065185,0.000035933033,0.0014082498,0.00046862196,0.000015467067,0.0004149541,0.0021830257],"genre_scores_gemma":[0.9817836,0.000044639775,0.017696014,0.000014552309,0.00016148557,0.00006937672,0.00011688829,0.000043996602,0.00006939411],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986459,0.000016300442,0.00052070484,0.00031162731,0.00027744312,0.00022802295],"domain_scores_gemma":[0.99864304,0.000027484328,0.00021193147,0.00013098822,0.0008510454,0.00013549726],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037033507,0.00025513244,0.00029905935,0.00032268884,0.00016274152,0.00014364722,0.0000850446,0.00023476453,0.000015065686],"category_scores_gemma":[0.00009736018,0.0002784071,0.00008816956,0.0004016301,0.000116061776,0.001080696,0.000020163234,0.00016092676,0.000010216536],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050193776,0.000066594526,0.0065554804,0.0023605532,0.00044825632,0.0000013784091,0.0026220651,0.04177149,0.035378456,0.5663956,0.001330308,0.34256792],"study_design_scores_gemma":[0.0015301325,0.0002521199,0.0004489482,0.00019062035,0.00016951388,0.00013880989,0.006725526,0.9418459,0.04016447,0.0041550277,0.003974379,0.00040454182],"about_ca_topic_score_codex":0.000021005319,"about_ca_topic_score_gemma":0.000013022331,"teacher_disagreement_score":0.9000744,"about_ca_system_score_codex":0.00012953553,"about_ca_system_score_gemma":0.000055708664,"threshold_uncertainty_score":0.9999668},"labels":[],"label_agreement":null},{"id":"W4229701415","doi":"10.1177/0361198105190700110","title":"Evaluation of Dowel Bars Installed in Airfield Concrete Pavement Construction Joints by Using Plastic Sleeves","year":2005,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Dowel; Structural engineering; Drilling; Bar (unit); Engineering; Consolidation (business); Installation; Geotechnical engineering; Forensic engineering; Geology; Mechanical engineering","score_opus":0.07483710276364233,"score_gpt":0.3494602198399551,"score_spread":0.2746231170763128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229701415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99381065,0.00045140096,0.003644652,0.0003619846,0.0006826034,0.00075673865,0.000057712467,0.000022697872,0.00021157578],"genre_scores_gemma":[0.9970473,0.00058891764,0.00211737,0.000009172277,0.000106924635,0.00004870001,0.000017287737,0.000034124292,0.000030191455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9927155,0.0009510135,0.0015840189,0.0002441693,0.0040097428,0.00049556233],"domain_scores_gemma":[0.9954105,0.0004385211,0.00032310438,0.00025725013,0.0033995563,0.00017106747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053386027,0.00020692286,0.00037364342,0.00105042,0.00019279131,0.00005750673,0.00038733552,0.00020678632,0.0005175153],"category_scores_gemma":[0.00017882966,0.0001767677,0.00020123685,0.0013589987,0.00042112498,0.00074080273,0.000003271394,0.0013633752,0.0000056270474],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016468688,0.00026792238,0.17373483,0.00073550525,0.00076856965,0.000025629299,0.007870706,0.34800306,0.27560684,0.0044242414,0.0046554618,0.18226038],"study_design_scores_gemma":[0.012577568,0.001028901,0.67530227,0.002115936,0.0004959893,0.000006620977,0.013031842,0.15266475,0.13023812,0.005370981,0.0062889457,0.0008780696],"about_ca_topic_score_codex":0.0018641263,"about_ca_topic_score_gemma":0.012978283,"teacher_disagreement_score":0.5015674,"about_ca_system_score_codex":0.00060588884,"about_ca_system_score_gemma":0.00053265016,"threshold_uncertainty_score":0.72421867},"labels":[],"label_agreement":null},{"id":"W4230082142","doi":"10.29173/mocs191","title":"The Impact of Building Information Modelling (BIM) for Contractor Costing in Offsite Construction Projects in the UK","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Productivity; Status quo; Activity-based costing; Construction industry; Integrated project delivery; Construction management; Value (mathematics); Risk analysis (engineering); Building construction; Business; Construction engineering; Engineering management; Engineering; Operations management; Computer science; Marketing; Civil engineering; Economics","score_opus":0.019206303532829896,"score_gpt":0.2318636703462559,"score_spread":0.212657366813426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230082142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9476593,0.00034696763,0.049921535,0.00006312777,0.0004621114,0.0008769633,0.000023719951,0.00008024146,0.0005660184],"genre_scores_gemma":[0.99230015,0.00012596633,0.0072856285,0.000013531488,0.000119676544,0.000112707254,0.000020265386,0.000017795572,0.0000042584743],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984398,0.00002414577,0.00071799156,0.00020684028,0.00027048436,0.00034072116],"domain_scores_gemma":[0.99899673,0.000102181955,0.00025727347,0.00011640593,0.00045372258,0.000073711024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008183509,0.0002564955,0.00029218305,0.0003710655,0.00020222913,0.00027419682,0.00015258264,0.00018893465,0.0000026806094],"category_scores_gemma":[0.00014788908,0.00018553965,0.000107239495,0.0005745362,0.00020392115,0.0012354762,0.000019798568,0.00034422227,8.793952e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009367048,0.00006181948,0.32770628,0.0005986017,0.00024805858,0.0000019797517,0.010142202,0.14571878,0.008491381,0.10134961,0.00073643524,0.40400815],"study_design_scores_gemma":[0.002988396,0.00018779938,0.0075110584,0.0002915353,0.000057627494,0.00020200688,0.017597726,0.95839167,0.0037396299,0.006311173,0.002228895,0.00049246306],"about_ca_topic_score_codex":0.00023292482,"about_ca_topic_score_gemma":0.00006544282,"teacher_disagreement_score":0.8126729,"about_ca_system_score_codex":0.00021711277,"about_ca_system_score_gemma":0.00008067609,"threshold_uncertainty_score":0.7566088},"labels":[],"label_agreement":null},{"id":"W4230397293","doi":"10.5383/ijtee.04.0x.00xx","title":"A Standard Process for Sustainable Design","year":2015,"lang":"en","type":"article","venue":"International Journal of Thermal and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainable design; Sustainability; Process (computing); Design process; Building information modeling; Process management; Engineering design process; Exploratory research; Computer science; Knowledge management; Architectural engineering; Systems engineering; Business; Engineering; Work in process; Marketing; Operations management","score_opus":0.009071675924966952,"score_gpt":0.20139605159256213,"score_spread":0.1923243756675952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230397293","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6758496,0.0007222513,0.32238418,0.000061139704,0.00062217703,0.000084951724,0.00000846276,0.000028806475,0.00023839921],"genre_scores_gemma":[0.997715,0.00003211085,0.0019943016,0.000009829741,0.0001796804,0.000005708125,0.000002107371,0.00001142054,0.000049848095],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995992,0.0000029214539,0.0001391078,0.000035176134,0.00014493137,0.00007864394],"domain_scores_gemma":[0.9998388,0.000013228774,0.000030081532,0.000020028097,0.00003796151,0.000059880393],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010932255,0.000063750886,0.00006969741,0.000064175234,0.000011115122,0.000029781144,0.00007655924,0.00002551245,0.000011581641],"category_scores_gemma":[0.000013671504,0.000056528206,0.000029159124,0.000014901989,0.000011991005,0.0002671789,0.000008403863,0.000060995837,6.532373e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016886689,0.000012153088,0.00028005528,0.000020882188,0.00012709707,0.000019804798,0.00040794184,0.9703201,0.012978888,0.00061403273,0.00021192676,0.014838254],"study_design_scores_gemma":[0.0052445754,0.00078356295,0.0014012683,0.00015045615,0.000089188055,0.0012407724,0.006270729,0.81736887,0.114228316,0.0034417221,0.049130145,0.0006504206],"about_ca_topic_score_codex":5.164655e-7,"about_ca_topic_score_gemma":4.080407e-8,"teacher_disagreement_score":0.32186535,"about_ca_system_score_codex":0.000104901825,"about_ca_system_score_gemma":0.000009924708,"threshold_uncertainty_score":0.23051533},"labels":[],"label_agreement":null},{"id":"W4230732195","doi":"10.32920/ryerson.14665020","title":"Climate Change Impact on Design and Building Criteria of Infrastructure Assets - Simulation Model","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"","keywords":"Climate change; Investment (military); Asset (computer security); Contingency plan; Simulation modeling; Computer science; Environmental resource management; Risk analysis (engineering); Environmental economics; Environmental science; Business; Operations research; Engineering; Economics; Microeconomics","score_opus":0.03574128903893163,"score_gpt":0.30658048957534156,"score_spread":0.2708392005364099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230732195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48261467,0.00012821546,0.5162541,0.000007691295,0.00032783984,0.00019310348,0.00003608534,0.00010923033,0.00032903216],"genre_scores_gemma":[0.9646264,0.00018611175,0.034994587,0.000014503731,0.00007927044,0.000023715793,0.000046671226,0.000026169277,0.0000025844222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993025,0.000029757031,0.00023220458,0.00019487277,0.00011145314,0.00012923578],"domain_scores_gemma":[0.9995861,0.000040419895,0.00006400767,0.0001871463,0.00007961554,0.00004269633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008681763,0.00021924356,0.00024575932,0.00013740592,0.000026319354,0.00008833443,0.000055951503,0.00029741594,0.00011264969],"category_scores_gemma":[0.000010553629,0.00019020918,0.00007049438,0.000059952927,0.0000152455905,0.00014938781,0.000061394225,0.00027075165,4.5560813e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000133794165,0.0000031441066,0.00012799019,0.00016272864,0.000029385204,4.7365393e-7,0.00020922747,0.97360307,0.0051642363,0.00055555976,0.000035980138,0.020094827],"study_design_scores_gemma":[0.0000911938,0.00001803594,0.0031580788,0.0002191304,0.000024630726,0.0000032258818,0.00002582069,0.9894474,0.0049279127,0.0019201136,0.0000021883318,0.0001622601],"about_ca_topic_score_codex":0.000012222985,"about_ca_topic_score_gemma":0.0000015031654,"teacher_disagreement_score":0.4820117,"about_ca_system_score_codex":0.0000673553,"about_ca_system_score_gemma":0.000019712554,"threshold_uncertainty_score":0.7756505},"labels":[],"label_agreement":null},{"id":"W4230746207","doi":"10.32920/ryerson.14649519","title":"Investigating building information model to building energy model data transfer integrity and simulation results","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Sciencetech (Canada); University of Waterloo","funders":"Lawrence Berkeley National Laboratory; Construction Industry Council; U.S. General Services Administration; U.S. Department of Energy","keywords":"Building information modeling; Reliability (semiconductor); Building energy simulation; Energy modeling; Computer science; Process (computing); Energy (signal processing); Reliability engineering; Efficient energy use; Energy performance; Simulation; Engineering; Operating system","score_opus":0.058715359176305736,"score_gpt":0.27941112992775324,"score_spread":0.2206957707514475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230746207","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15208471,0.000058461377,0.84529835,0.00014343427,0.0003049233,0.00015880051,0.00026387352,0.00038267652,0.001304741],"genre_scores_gemma":[0.7909667,0.000056528002,0.20763262,0.00017137073,0.00007209756,0.000025692905,0.0010325196,0.000024227975,0.000018235858],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982832,0.000029621691,0.0007520007,0.00044174437,0.0002761091,0.00021731213],"domain_scores_gemma":[0.9988727,0.000060586324,0.000055262244,0.0006685816,0.00019278466,0.00015007894],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00033449987,0.00032476243,0.00028727605,0.00027329108,0.00010858752,0.00047356248,0.00030704317,0.0004424854,0.0000053040853],"category_scores_gemma":[0.00018218714,0.00034664213,0.00004871734,0.00019013847,0.000028971353,0.001599702,0.000414032,0.00079615414,7.1263014e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006069038,0.0000027177343,0.0000069288876,0.00012193143,0.00002812889,1.13758944e-7,0.0007924125,0.9505595,0.0020162545,0.011252991,0.00014405511,0.03506888],"study_design_scores_gemma":[0.00019674873,0.0000043621726,0.000009863501,0.00028400213,0.00003462194,0.0000026935054,0.00021447595,0.99140584,0.0027352707,0.0045472034,0.00019805394,0.00036688006],"about_ca_topic_score_codex":0.0003497618,"about_ca_topic_score_gemma":0.00022668937,"teacher_disagreement_score":0.638882,"about_ca_system_score_codex":0.00013607157,"about_ca_system_score_gemma":0.00014717855,"threshold_uncertainty_score":0.99989855},"labels":[],"label_agreement":null},{"id":"W4230974727","doi":"10.21432/t2q10v","title":"Project Management for Computer-Based Training Development","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Learning and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Project management; Project management triangle; Computer science; Mandate; Project charter; Project manager; Engineering management; OPM3; Estimation; Management development; Process management; Knowledge management; Business; Management; Engineering; Political science; Systems engineering","score_opus":0.0170514334088074,"score_gpt":0.22478283236163535,"score_spread":0.20773139895282794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230974727","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68472254,0.00089434115,0.30694675,0.0013245081,0.0014434366,0.00023295594,0.0000022737902,0.00014126155,0.00429191],"genre_scores_gemma":[0.96844614,0.0000065798554,0.031410564,0.000004047206,0.00003838022,0.0000048462066,6.452007e-7,0.000006476107,0.00008234054],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997101,0.0000031897628,0.0001102075,0.00004213309,0.000022814156,0.00011157151],"domain_scores_gemma":[0.99979174,0.0000064422243,0.00006202986,0.000044446988,0.000046095818,0.000049257316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008692609,0.000047153706,0.00007977331,0.0003453604,0.00028289456,0.00005263503,0.000083937965,0.000059382324,0.0000041212807],"category_scores_gemma":[0.000016962416,0.000045917805,0.000014350916,0.000033292014,0.00005563961,0.000034656674,0.000002847422,0.00014562567,4.8787984e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017716758,7.552662e-7,0.0058865882,0.000026715641,0.00004077338,0.000017502447,0.00016877883,0.00055417954,0.000032966676,0.0024531195,0.00027212643,0.99054474],"study_design_scores_gemma":[0.0009827752,0.0001967021,0.0021574409,0.00022947333,0.000026999178,0.00025175174,0.001979774,0.019153764,0.001146821,0.0006204819,0.9730589,0.00019512835],"about_ca_topic_score_codex":0.000012052839,"about_ca_topic_score_gemma":0.00062354375,"teacher_disagreement_score":0.9903496,"about_ca_system_score_codex":0.000036716672,"about_ca_system_score_gemma":0.00013987599,"threshold_uncertainty_score":0.21758248},"labels":[],"label_agreement":null},{"id":"W4231392469","doi":"10.1109/wsc.2017.8247979","title":"Synthesizing engineering design, material takeoff and simulation-based estimating on a bridge deck reinforcement case","year":2017,"lang":"en","type":"article","venue":"2017 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Takeoff; Bridge (graph theory); Reinforcement; Computer science; Deck; Bridge deck; Structural engineering; Engineering; Aerospace engineering","score_opus":0.06019469213135643,"score_gpt":0.28410387024245454,"score_spread":0.22390917811109812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231392469","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2747251,0.0000062521535,0.72350353,0.000035873905,0.0008705391,0.00025887505,0.00001203678,0.0002120334,0.00037573],"genre_scores_gemma":[0.9916794,0.0000011778008,0.007931964,0.00003109704,0.00024887943,0.00003166057,0.000015707263,0.000034570458,0.000025596762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891585,0.00002695585,0.00037439255,0.00026650817,0.00017485015,0.00024145398],"domain_scores_gemma":[0.9988223,0.00033206376,0.00016129366,0.0004448313,0.00014034996,0.000099169694],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018368139,0.00026778536,0.00021491939,0.0001420013,0.00040972675,0.0006684481,0.00015421005,0.00012741945,0.00017629542],"category_scores_gemma":[0.00032490867,0.00027567812,0.00005011419,0.00003110454,0.00005295348,0.00054171635,0.000029928706,0.00015244342,0.00003102778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037388025,0.0000054411166,0.00024421173,0.000047300713,0.000024226429,0.000027576174,0.00019822441,0.98632044,0.0010845962,0.00028896995,0.000021467791,0.011700167],"study_design_scores_gemma":[0.00044793863,0.000050199516,0.0027460605,0.00026775978,0.00002565803,0.00002385335,0.000021575705,0.99327064,0.0025674237,0.000061930055,0.00022777086,0.00028919],"about_ca_topic_score_codex":0.00004130071,"about_ca_topic_score_gemma":0.000017168783,"teacher_disagreement_score":0.71695423,"about_ca_system_score_codex":0.00008072685,"about_ca_system_score_gemma":0.000033058943,"threshold_uncertainty_score":0.99996954},"labels":[],"label_agreement":null},{"id":"W4231484164","doi":"10.1109/wsc.1999.816811","title":"Simphony: an environment for building special purpose construction simulation tools","year":2003,"lang":"en","type":"article","venue":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Process (computing); Set (abstract data type); Software engineering; Systems engineering; Identification (biology); Development environment; Engineering; Programming language","score_opus":0.02751389622759264,"score_gpt":0.2587370734141346,"score_spread":0.23122317718654195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231484164","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34093955,0.00005950326,0.64817274,0.00027617105,0.0052488046,0.0030334245,0.00018199126,0.0007308278,0.0013570146],"genre_scores_gemma":[0.97640586,0.000035109082,0.016645662,0.00029791964,0.0056050997,0.0003282984,0.00029532405,0.00015476834,0.00023194206],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9957057,0.00011084397,0.0013790702,0.0010877313,0.0008116855,0.0009049278],"domain_scores_gemma":[0.9970833,0.00036409765,0.0004755659,0.00056947937,0.0011350161,0.00037252367],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00079760334,0.0008668086,0.00063337106,0.0004995983,0.0007912806,0.0010755499,0.0005234715,0.0005109936,0.0008791272],"category_scores_gemma":[0.0004483395,0.00082021387,0.00031673422,0.00064234505,0.00015031308,0.0025075949,0.00007320083,0.00041513142,0.0003235494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028739264,0.0000724035,0.00080312276,0.00008234257,0.000088840134,5.129281e-7,0.0019429463,0.8987455,0.0037975379,0.008201905,0.00075177645,0.085225716],"study_design_scores_gemma":[0.001107913,0.00020131204,0.0023245937,0.0000771024,0.00010619745,0.000011102331,0.0005187687,0.7898552,0.0012339994,0.001166352,0.20261931,0.0007781561],"about_ca_topic_score_codex":0.000026976415,"about_ca_topic_score_gemma":0.000049674498,"teacher_disagreement_score":0.63546634,"about_ca_system_score_codex":0.0007594925,"about_ca_system_score_gemma":0.00014360032,"threshold_uncertainty_score":0.99996144},"labels":[],"label_agreement":null},{"id":"W4231934320","doi":"10.32920/ryerson.14654727","title":"Design of a Two Story ISO Shipping Container Building","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Container (type theory); Factory (object-oriented programming); Manufacturing engineering; Business; Architectural engineering; Computer science; Engineering; Mechanical engineering","score_opus":0.023170987559213797,"score_gpt":0.24244309872778408,"score_spread":0.2192721111685703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231934320","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038185865,0.001023614,0.95360035,0.000025725589,0.001298979,0.00013946,0.0000021343756,0.00024490143,0.005478976],"genre_scores_gemma":[0.9471946,0.000060506314,0.05232763,0.000021927519,0.00011601022,0.00003289849,0.000010030702,0.000025147565,0.00021128565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932754,0.00005176091,0.00023246926,0.00016791935,0.000108579974,0.0001117511],"domain_scores_gemma":[0.99954695,0.000052152744,0.00005043159,0.00021783645,0.00010185611,0.00003077382],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015774173,0.00015541224,0.00023406235,0.000111189605,0.000023262177,0.00004215894,0.0001013134,0.00016359625,0.00033123075],"category_scores_gemma":[0.000017517497,0.00015917112,0.00008331695,0.00006792148,0.000022921327,0.00006236963,0.00006171189,0.000446807,0.000003006614],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068466106,0.0000114083905,0.00018494794,0.00041655015,0.00026434913,0.0000060434795,0.0007303392,0.8427327,0.11074028,0.018143516,0.00085161824,0.02591135],"study_design_scores_gemma":[0.00068943115,0.000025807676,0.00025563696,0.0010616028,0.00013985805,0.00003886032,0.0018364936,0.8639343,0.12510774,0.0047100307,0.0012873462,0.00091293966],"about_ca_topic_score_codex":0.00005703633,"about_ca_topic_score_gemma":0.00001920853,"teacher_disagreement_score":0.9090087,"about_ca_system_score_codex":0.000092318915,"about_ca_system_score_gemma":0.000074244774,"threshold_uncertainty_score":0.649081},"labels":[],"label_agreement":null},{"id":"W4232096617","doi":"10.1109/wsc.2013.6721688","title":"Assessment of construction operations productivity rate as computed by simulation models","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Discrete event simulation; Productivity; Credibility; Duration (music); Simulation modeling; Process (computing); Computer science; Industrial engineering; Simulation; Operations research; Engineering; Mathematics","score_opus":0.020094328326755326,"score_gpt":0.25853768443047775,"score_spread":0.23844335610372241,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232096617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39854014,0.000020600675,0.5967771,0.0002143268,0.00047448737,0.0005320692,0.000050437884,0.00021202191,0.0031788542],"genre_scores_gemma":[0.99384105,0.000008561561,0.0055019073,0.00003866238,0.00007306672,0.00007494425,0.00018799711,0.000025993117,0.00024780387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986737,0.00008156176,0.00053877226,0.00029800282,0.00020456962,0.00020344014],"domain_scores_gemma":[0.9985707,0.00008082695,0.00009216091,0.00035981706,0.0008164453,0.00008004852],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00009468412,0.00023608052,0.0002573015,0.00020202038,0.00014566559,0.0001710251,0.00014573832,0.00014102613,0.0011734127],"category_scores_gemma":[0.000021942627,0.00023961668,0.000070431524,0.0002889458,0.00013792448,0.0015436166,0.000028551427,0.00022184716,0.00007851307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022998172,0.000042050408,0.00089365896,0.00001819175,0.000051460716,6.238448e-8,0.0001569466,0.9641759,0.013693929,0.012548605,0.00059462886,0.007822271],"study_design_scores_gemma":[0.00033789652,0.000039074057,0.005568274,0.000038104572,0.00002601399,0.0000032838964,0.000112759844,0.98556036,0.0027257714,0.004853212,0.0005002296,0.00023503552],"about_ca_topic_score_codex":0.00023005978,"about_ca_topic_score_gemma":0.000116298186,"teacher_disagreement_score":0.5953009,"about_ca_system_score_codex":0.00009272635,"about_ca_system_score_gemma":0.0000878222,"threshold_uncertainty_score":0.99973965},"labels":[],"label_agreement":null},{"id":"W4232777831","doi":"10.2172/823770","title":"ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM","year":2004,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Tsinghua University","keywords":"Combustion; Fluidized bed combustion; Engineering; Work (physics); Fluidized bed; Quarter (Canadian coin); National laboratory; Control (management); Environmental science; Waste management; Mechanical engineering; Computer science; Engineering physics","score_opus":0.00436543696027485,"score_gpt":0.18344140084284233,"score_spread":0.17907596388256747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232777831","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94021904,0.0027485013,0.033411354,0.000026704467,0.0022782113,0.0016566521,0.0005094488,0.0025128121,0.01663727],"genre_scores_gemma":[0.99842817,0.000061300416,0.0011143398,0.0000030896563,0.00009400878,0.000084452295,0.00013975392,0.00005066466,0.000024204644],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99867046,0.00002193016,0.0004817397,0.00023484505,0.00042481313,0.00016620246],"domain_scores_gemma":[0.9993277,0.000010341035,0.00018864877,0.000300777,0.00012212324,0.000050399325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016602407,0.00025701828,0.00042801123,0.00029974608,0.000045264598,0.000023607092,0.00009325342,0.00046224607,0.000059699658],"category_scores_gemma":[0.0000075612807,0.00022515949,0.000047988317,0.000195217,0.0000868647,0.00014422968,0.0000085240645,0.0002875989,0.0000051930083],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027886644,0.00063898053,0.017344136,0.010978564,0.0039986838,0.00035758907,0.0006523644,0.11338935,0.6856262,0.02512424,0.0012376448,0.14037336],"study_design_scores_gemma":[0.021221539,0.0025121071,0.0023740032,0.01014316,0.0031840072,0.0064584995,0.027964765,0.053939994,0.8527662,0.00029401033,0.013051528,0.0060901823],"about_ca_topic_score_codex":0.00007876198,"about_ca_topic_score_gemma":0.000034216137,"teacher_disagreement_score":0.16713999,"about_ca_system_score_codex":0.001084266,"about_ca_system_score_gemma":0.00026922906,"threshold_uncertainty_score":0.91817373},"labels":[],"label_agreement":null},{"id":"W4232991494","doi":"10.1061/9780784412329.119","title":"Change Management with Building Information Models: A Case Study","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Building information modeling; Context (archaeology); Ontology; Process (computing); Change management (ITSM); Process management; Information model; Position paper; Systems engineering; Software engineering; Engineering; World Wide Web","score_opus":0.0818108159702323,"score_gpt":0.32312618818141925,"score_spread":0.24131537221118693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232991494","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.941879,0.0007509185,0.03216372,0.000052807045,0.0025600705,0.0018711424,0.000015860007,0.00055918325,0.020147335],"genre_scores_gemma":[0.9958565,0.00007401881,0.003074549,0.00001028661,0.00025166967,0.0006259477,0.0000067623932,0.000020479107,0.00007975903],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99843735,0.00011241794,0.0002612608,0.00013102537,0.0005443256,0.0005136471],"domain_scores_gemma":[0.9990947,0.00003766207,0.000042435557,0.000287545,0.0003425632,0.00019506973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006483488,0.00016348655,0.00013476881,0.0006103304,0.000303717,0.00016794576,0.00011142045,0.000081957005,0.00017144089],"category_scores_gemma":[0.0000075764224,0.00014372298,0.000027743152,0.000561755,0.00017838631,0.004739126,0.000054159835,0.00037122038,0.000081507846],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007149514,0.000118498385,0.015557499,0.00021724765,0.00029495265,0.0001438833,0.0043703476,0.0010380873,0.00003660131,0.07889883,0.001857916,0.89739466],"study_design_scores_gemma":[0.012200597,0.0011144443,0.0120111685,0.0007749771,0.0005114396,0.04766389,0.46717253,0.21354121,0.00258943,0.0046618553,0.23417723,0.0035812254],"about_ca_topic_score_codex":0.00012129087,"about_ca_topic_score_gemma":0.000062409104,"teacher_disagreement_score":0.89381343,"about_ca_system_score_codex":0.0001533196,"about_ca_system_score_gemma":0.000015611515,"threshold_uncertainty_score":0.5860853},"labels":[],"label_agreement":null},{"id":"W4234274816","doi":"10.1061/(asce)0733-9364(2003)129:4(471)","title":"Closure to “Improving Design Coordination for Building Projects. I: Information Model” by Tarek Hegazy, Essam Zaneldin, and Donald Grierson","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Closure (psychology); Computer science; Sociology; Architectural engineering; Political science; Engineering","score_opus":0.005875316181565935,"score_gpt":0.18095947952348362,"score_spread":0.17508416334191768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234274816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035583634,0.000237651,0.9629356,0.00010842498,0.00062068197,0.00031767212,0.0000058760584,0.000058585454,0.0001318327],"genre_scores_gemma":[0.76643693,0.00019557013,0.23320663,0.0000327462,0.00004463028,0.00003665814,0.0000032440093,0.000014956488,0.000028629382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931234,0.0000101915475,0.000329286,0.00008013372,0.00013467533,0.00013335093],"domain_scores_gemma":[0.9996255,0.00002360689,0.00009976174,0.000049868566,0.000121830366,0.000079413265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028982322,0.00013498768,0.00014441076,0.0003194107,0.00007165294,0.0001063809,0.00003752859,0.00006132517,0.0000018674035],"category_scores_gemma":[0.00003997235,0.00013286465,0.000033635602,0.00013580534,0.000014945227,0.0006395099,0.000007210459,0.00010863691,2.0798988e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040265753,0.000007487508,0.000066176006,0.0005287801,0.00013781236,9.001253e-7,0.00027054726,0.79638624,0.005572154,0.051328342,0.004202551,0.14145876],"study_design_scores_gemma":[0.0016068898,0.00020504704,0.00009583726,0.0002044965,0.00013633394,0.0003733286,0.001068183,0.9355908,0.008756203,0.00096508884,0.05059938,0.00039842943],"about_ca_topic_score_codex":0.0000014073555,"about_ca_topic_score_gemma":3.348675e-7,"teacher_disagreement_score":0.7308533,"about_ca_system_score_codex":0.000072814095,"about_ca_system_score_gemma":0.000011933327,"threshold_uncertainty_score":0.54180634},"labels":[],"label_agreement":null},{"id":"W4234345597","doi":"10.1007/978-1-4614-6170-8_100151","title":"Virtual Settlement","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Settlement (finance); Computer science; World Wide Web","score_opus":0.0076023840723635425,"score_gpt":0.1800888076863955,"score_spread":0.17248642361403196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234345597","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000024037486,0.000055773726,0.04722675,0.000023687817,0.0008273336,0.000041134543,0.000011946467,0.0002639182,0.951547],"genre_scores_gemma":[0.003867956,0.00004855165,0.0002258593,0.00007430973,0.00030810467,0.000004253468,0.000055096993,0.000031091702,0.99538475],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996751,8.744265e-7,0.00011574036,0.00007357309,0.00007901538,0.000055682376],"domain_scores_gemma":[0.999837,0.0000055358655,0.000012458875,0.00010844191,0.000011317017,0.000025276437],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000018292569,0.000114948794,0.00008910183,0.000045880643,0.000012879878,0.000013429911,0.000039433893,0.00013688082,0.0053339726],"category_scores_gemma":[5.1371785e-7,0.00010417312,0.0000458254,0.0000034345742,0.000013243769,0.000013217914,0.00000564925,0.00011916282,0.0011644586],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.992793e-7,1.5860314e-7,3.159579e-7,0.0000041615917,0.000020453486,2.0370126e-7,0.000004533327,0.00006408118,0.000010403213,0.8017132,0.047336176,0.15084597],"study_design_scores_gemma":[0.000041318344,0.000012546048,0.0000010120726,0.000017066084,0.000010377227,0.0000036765266,0.0000033247306,0.0010503163,0.00010838325,0.004336001,0.99428755,0.00012842209],"about_ca_topic_score_codex":6.291067e-7,"about_ca_topic_score_gemma":0.000010347498,"teacher_disagreement_score":0.9469514,"about_ca_system_score_codex":0.000031632226,"about_ca_system_score_gemma":0.000004957649,"threshold_uncertainty_score":0.9996132},"labels":[],"label_agreement":null},{"id":"W4234390470","doi":"10.1139/cjce-28-1-1","title":"A fuzzy expert system for design performance prediction and evaluation","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fuzzy logic; Computer science; Expert system; Engineering; Operations research; Data mining; Artificial intelligence","score_opus":0.01601565219101328,"score_gpt":0.191659534505783,"score_spread":0.1756438823147697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234390470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27329835,0.0053500636,0.71499026,0.00005042639,0.0032699325,0.00034536002,0.000008658863,0.00009521063,0.0025917396],"genre_scores_gemma":[0.99834716,0.00009100571,0.0012202209,0.0000039059223,0.00029195086,0.00002012281,0.0000015022041,0.000015893045,0.000008227802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952596,0.0000073832994,0.00019860345,0.00004615781,0.000088553024,0.00013332073],"domain_scores_gemma":[0.9995951,0.000019275605,0.000031332875,0.0000463239,0.00014382772,0.00016415812],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028676153,0.000076606215,0.0000921232,0.00022737584,0.00005070418,0.000041345236,0.000040956824,0.000053373245,0.000014760288],"category_scores_gemma":[0.000025776946,0.00007874884,0.000027365797,0.00009341799,0.000007851972,0.00026517018,7.3452827e-7,0.0000822904,6.128338e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000095475425,9.983535e-7,0.00064675394,0.00010272268,0.000048384823,0.00000413293,0.00040773142,0.95862067,0.0025605669,0.00045921962,0.0012334642,0.035905816],"study_design_scores_gemma":[0.00040390182,0.000064010645,0.0017294026,0.00022747046,0.00002945502,0.00054725475,0.00016200177,0.9889467,0.000738027,0.00003653006,0.0070148227,0.00010045661],"about_ca_topic_score_codex":0.000028584634,"about_ca_topic_score_gemma":0.001335629,"teacher_disagreement_score":0.72504884,"about_ca_system_score_codex":0.00025344995,"about_ca_system_score_gemma":0.00011565326,"threshold_uncertainty_score":0.32112846},"labels":[],"label_agreement":null},{"id":"W4235729757","doi":"10.2172/1165978","title":"Fenestration system energy performance research, implementation, and international harmonization","year":2014,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Certification; Harmonization; Process (computing); Computer science; Engineering; Systems engineering","score_opus":0.04707988594072267,"score_gpt":0.3172516958618972,"score_spread":0.27017180992117457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235729757","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024233246,0.0011036621,0.19590932,0.0001881615,0.011252863,0.0005044162,0.000064859036,0.0013106584,0.76543283],"genre_scores_gemma":[0.99152404,0.0024941843,0.00031297584,0.0000074491804,0.0009592042,0.00009899298,0.00077405106,0.000037649603,0.0037914475],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986294,0.000040982977,0.0003859002,0.00021215976,0.0005778544,0.00015374119],"domain_scores_gemma":[0.9987942,0.00002294613,0.00007376313,0.00014064352,0.0009187406,0.00004971294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004680742,0.00015802927,0.00014230332,0.00034108091,0.00012635454,0.00016218807,0.000096119176,0.00020526287,0.00017559848],"category_scores_gemma":[0.000012944743,0.00015508595,0.000026599713,0.00015474675,0.000037566162,0.00024368388,0.000020987845,0.00019231517,0.00001597438],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007783367,0.000007743468,0.0068970276,0.0008963574,0.00017682459,0.0000013391864,0.00010517366,0.0009507412,0.0005273688,0.051832836,0.0940677,0.8445291],"study_design_scores_gemma":[0.00052375195,0.000083986866,0.009321856,0.0004218324,0.00006309744,0.0003029902,0.00148411,0.15446062,0.006368583,0.00029064683,0.82599115,0.00068734697],"about_ca_topic_score_codex":0.0003209374,"about_ca_topic_score_gemma":0.00036344523,"teacher_disagreement_score":0.9672908,"about_ca_system_score_codex":0.00047095213,"about_ca_system_score_gemma":0.00016068187,"threshold_uncertainty_score":0.63242215},"labels":[],"label_agreement":null},{"id":"W4235972867","doi":"10.1109/wsc.1999.816807","title":"Product-based model representation for integrating 3D CAD with computer simulation","year":2003,"lang":"en","type":"article","venue":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"CAD; Computer Aided Design; Computer science; Representation (politics); Product design; Process (computing); Product (mathematics); Information model; Computer-aided manufacturing; Engineering design process; Solid modeling; Software engineering; Engineering drawing; Systems engineering; Building information modeling; Engineering; Artificial intelligence","score_opus":0.02925369710858671,"score_gpt":0.27043466367112967,"score_spread":0.24118096656254295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235972867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11771178,0.000036758185,0.87557614,0.00045689562,0.0015966451,0.0027673277,0.000083063984,0.0007702545,0.0010011388],"genre_scores_gemma":[0.9407874,0.0000055737783,0.055762183,0.00048363704,0.0017681189,0.00042057142,0.00031455976,0.00015231523,0.00030568568],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99601763,0.00009204765,0.0012151902,0.0011094898,0.00078742247,0.00077819295],"domain_scores_gemma":[0.9953859,0.00037430518,0.000491018,0.00057393045,0.0028990202,0.0002758252],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00069793145,0.0008207223,0.00059971854,0.0005022481,0.00064753357,0.000782142,0.00044856945,0.0003153964,0.00012917911],"category_scores_gemma":[0.00039737328,0.0006754894,0.00023480858,0.0010025802,0.00010796348,0.0015065778,0.00004788931,0.00042704577,0.000110758876],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035528096,0.000062915264,0.0015071736,0.00014490512,0.00009784959,4.127799e-7,0.0023892806,0.9740323,0.0013320304,0.0025588132,0.0012828772,0.016236207],"study_design_scores_gemma":[0.0014522917,0.00022671236,0.0012501745,0.00021373195,0.00013831831,0.0000066335924,0.00027407604,0.982064,0.0011889806,0.00035320557,0.011995563,0.0008363268],"about_ca_topic_score_codex":0.000049989496,"about_ca_topic_score_gemma":0.00020322413,"teacher_disagreement_score":0.8230756,"about_ca_system_score_codex":0.00046120363,"about_ca_system_score_gemma":0.0002505214,"threshold_uncertainty_score":0.99956965},"labels":[],"label_agreement":null},{"id":"W4236037876","doi":"10.1109/wsc.2013.6721687","title":"A discrete event simulation model of asphalt paving operations","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Computer science; Simulation modeling; Construction industry; Asphalt; Construction engineering; Systems engineering; Engineering; Simulation","score_opus":0.024427730599037304,"score_gpt":0.25422194873072623,"score_spread":0.22979421813168893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236037876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27804825,0.00003251922,0.71883297,0.00017932263,0.00024734228,0.00035140238,0.00003935336,0.0001644817,0.002104358],"genre_scores_gemma":[0.9960626,0.000008478378,0.0031687103,0.000047030026,0.000058925067,0.00006891563,0.000060217524,0.000026016873,0.0004991073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988933,0.000025293153,0.00050978386,0.00019398353,0.00018002567,0.00019758784],"domain_scores_gemma":[0.9990589,0.000055402375,0.00005667998,0.00031066773,0.00044252202,0.00007585093],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000049704904,0.00019070736,0.00019185903,0.00017585541,0.000108431064,0.000116050556,0.00015219524,0.00011340044,0.001386867],"category_scores_gemma":[0.000026284633,0.0001834672,0.000087676104,0.00017139479,0.000061477476,0.00090947544,0.000029192994,0.00015828249,0.00015037184],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001887892,0.000014962014,0.0005134797,0.000015383122,0.000027641794,4.7540276e-8,0.00048908946,0.982541,0.005575818,0.004079293,0.00019436885,0.006547011],"study_design_scores_gemma":[0.00022387976,0.000018952549,0.0015679124,0.000057754594,0.000023004488,8.3205435e-7,0.00012847673,0.99420494,0.0011457447,0.0022049462,0.00023003478,0.00019353793],"about_ca_topic_score_codex":0.000114554656,"about_ca_topic_score_gemma":0.00026416898,"teacher_disagreement_score":0.71801436,"about_ca_system_score_codex":0.000056179037,"about_ca_system_score_gemma":0.000049667982,"threshold_uncertainty_score":0.999526},"labels":[],"label_agreement":null},{"id":"W4236303276","doi":"10.1088/1755-1315/491/1/011001","title":"Preface","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Library science; State (computer science); Management; Computer science","score_opus":0.009763206059713219,"score_gpt":0.17009454990664552,"score_spread":0.1603313438469323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236303276","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9895953,0.00010281184,0.00057820155,0.00024537163,0.00009847224,0.00004795903,0.00000939333,0.00008003958,0.009242466],"genre_scores_gemma":[0.999165,0.00020243174,0.00040539325,0.00009282209,0.000024447952,0.0000029804444,0.0000022553302,0.000003084661,0.00010159486],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99955165,0.0000031060715,0.00006459082,0.0001351912,0.000116730946,0.00012873144],"domain_scores_gemma":[0.99979746,0.000002161757,0.000008208921,0.000054560354,0.0000027134602,0.00013489179],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000023995122,0.000067553454,0.00005014223,0.000013496439,0.00010322192,0.00006805647,0.00008079656,0.000019721314,0.00032863594],"category_scores_gemma":[0.0000038844664,0.000062129526,0.000008412202,0.000081238475,0.00045764903,0.00046310987,0.00002815916,0.000060386825,0.00004947647],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008433979,0.0000034805385,0.0010047937,0.000011243223,0.00000299072,0.0000014142811,0.0009950248,0.00034003032,0.8809788,0.004905847,0.00004558536,0.11170232],"study_design_scores_gemma":[0.00022578509,0.00017670104,0.066140406,0.00001167433,0.0000063358484,0.00004483995,0.0027473567,0.027266124,0.8591773,0.0002504963,0.043593258,0.00035970443],"about_ca_topic_score_codex":0.0000025717707,"about_ca_topic_score_gemma":0.00000460339,"teacher_disagreement_score":0.11134262,"about_ca_system_score_codex":0.0000073569163,"about_ca_system_score_gemma":0.000010953669,"threshold_uncertainty_score":0.3598333},"labels":[],"label_agreement":null},{"id":"W4236560597","doi":"10.1109/wsc.2009.5429239","title":"Meaningful Level of Change in hybrid simulation for construction analysis","year":2009,"lang":"en","type":"article","venue":"Proceedings of the 2009 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Hybrid system; Set (abstract data type); Limit (mathematics); Domain (mathematical analysis); Discrete event simulation; Event (particle physics); Industrial engineering; Construction industry; Data mining; Simulation; Machine learning; Engineering; Mathematics; Construction engineering","score_opus":0.10035144687889602,"score_gpt":0.2943295911029265,"score_spread":0.19397814422403048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236560597","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7783246,0.00003993297,0.21934807,0.00014133798,0.0002742653,0.0006068493,0.00005703043,0.000077531615,0.0011303715],"genre_scores_gemma":[0.9977342,0.0000051349034,0.0020887177,0.000028514607,0.00006957273,0.000019573825,0.000010434062,0.000009602583,0.000034251007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897575,0.0000062694867,0.00051528984,0.00017251738,0.00018683009,0.00014335543],"domain_scores_gemma":[0.99896663,0.00005701073,0.00025200687,0.00009397709,0.0006031892,0.00002716098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015608864,0.00015015776,0.00027176962,0.00036313714,0.000037965085,0.000032940876,0.00016072915,0.000085385465,0.000052143623],"category_scores_gemma":[0.00008024783,0.00013272511,0.0001444915,0.00044530234,0.000051141276,0.0004862883,0.000011902908,0.00010427648,0.00000101576],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015830828,0.000049134564,0.018325815,0.00011994289,0.00013246918,4.4522867e-8,0.0019036809,0.8384458,0.02536474,0.0068500526,0.000044691726,0.10860534],"study_design_scores_gemma":[0.0005171066,0.000054368295,0.034654602,0.00008760224,0.000118313066,9.066923e-7,0.00015312429,0.92151767,0.03951319,0.003162755,0.00009114248,0.00012921533],"about_ca_topic_score_codex":0.00001447897,"about_ca_topic_score_gemma":0.00002565788,"teacher_disagreement_score":0.21940958,"about_ca_system_score_codex":0.00005657016,"about_ca_system_score_gemma":0.0000129423415,"threshold_uncertainty_score":0.5412373},"labels":[],"label_agreement":null},{"id":"W4236951425","doi":"10.1088/1757-899x/652/1/011001","title":"Preface","year":2019,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Political science; Engineering; Library science; Law; Computer science","score_opus":0.007874062229303962,"score_gpt":0.18468494945010255,"score_spread":0.1768108872207986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236951425","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9934784,0.000047648587,0.00058485393,0.000037963935,0.001506329,0.000091924005,0.0000052132355,0.00027246922,0.0039751646],"genre_scores_gemma":[0.9990858,0.00006763673,0.00061508885,0.0000101375645,0.000043285723,0.000011587859,0.0000014379672,0.000009921014,0.00015510386],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993374,0.0000026454059,0.00012814616,0.00015541419,0.00015850105,0.00021791681],"domain_scores_gemma":[0.9997032,0.000005452297,0.000012826475,0.00013219012,0.000084118874,0.00006216703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001572272,0.00011257388,0.00011815058,0.00009075779,0.000053304015,0.000258356,0.00012736967,0.00004025814,0.00029110265],"category_scores_gemma":[0.000016989929,0.00010518389,0.000007727641,0.00018921129,0.00009495774,0.0008407729,0.00003066042,0.000052232706,0.000066887056],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000021174267,7.3596607e-7,0.00003039536,0.00004839026,0.0000022922206,3.0266074e-7,0.00012313394,0.0010557361,0.9793547,0.01733154,0.000014721799,0.0020359738],"study_design_scores_gemma":[0.00009078623,0.000030470193,0.0028729306,0.000050725594,0.000003113008,0.00003650802,0.00019705929,0.008315858,0.9830856,0.00016177933,0.004935761,0.00021944412],"about_ca_topic_score_codex":0.0000059181602,"about_ca_topic_score_gemma":0.0000015302371,"teacher_disagreement_score":0.017169762,"about_ca_system_score_codex":0.000029828918,"about_ca_system_score_gemma":0.00003790381,"threshold_uncertainty_score":0.42892748},"labels":[],"label_agreement":null},{"id":"W4237231591","doi":"10.11159/iccste20","title":"Proceedings of the 4th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'19)","year":2020,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Construction engineering; Computer science; Aeronautics; Civil engineering","score_opus":0.015782423134544258,"score_gpt":0.21919730837616042,"score_spread":0.20341488524161616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237231591","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9776489,0.00020491282,0.00021229046,0.001442138,0.0057062595,0.00097539223,0.0014674559,0.00019799941,0.012144634],"genre_scores_gemma":[0.997966,0.00044408833,0.00030197029,0.000052783795,0.00031144277,0.000079607096,0.0001913584,0.00007019234,0.0005825469],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99739367,0.000003478317,0.00090318813,0.00054350455,0.0008680828,0.0002880642],"domain_scores_gemma":[0.9985268,0.00004072306,0.0005041421,0.000101996295,0.000688712,0.00013759015],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008915849,0.0006496122,0.0005462569,0.0002975902,0.00011639909,0.00020376715,0.0007744803,0.0003222039,0.0003770372],"category_scores_gemma":[0.000045453446,0.000494938,0.00022087466,0.0003194039,0.00014841449,0.0005485525,0.000027024205,0.0008948417,0.0000038287358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004985376,0.000037144524,0.006328464,0.0044700406,0.0015209622,0.0000024676212,0.0058002435,0.044205677,0.2635759,0.66474503,0.004392912,0.004422601],"study_design_scores_gemma":[0.004601591,0.00055285165,0.17617749,0.009423451,0.00081237743,0.00012269766,0.0031842592,0.6362436,0.14553821,0.007366794,0.012196247,0.003780472],"about_ca_topic_score_codex":0.00004872018,"about_ca_topic_score_gemma":0.00006789625,"teacher_disagreement_score":0.65737826,"about_ca_system_score_codex":0.00011981621,"about_ca_system_score_gemma":0.00006142968,"threshold_uncertainty_score":0.9997502},"labels":[],"label_agreement":null},{"id":"W4237253441","doi":"10.22260/isarc2016","title":"Proceedings of the 33rd International Symposium on Automation and Robotics in Construction (ISARC)","year":2016,"lang":"en","type":"paratext","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Robotics; Automation; Artificial intelligence; Computer science; Robot; Engineering; Mechanical engineering","score_opus":0.006639652297666454,"score_gpt":0.20220904277787077,"score_spread":0.19556939048020433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237253441","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47382727,0.00031894192,0.0001302184,0.005985008,0.014118715,0.0016357308,0.00020441062,0.00018572052,0.503594],"genre_scores_gemma":[0.99025595,0.00061302265,0.00085394556,0.000042474003,0.00050428614,0.000061972656,0.000006715777,0.00006418257,0.0075974315],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986031,0.000003965394,0.0005467717,0.0002469953,0.0004216207,0.00017754316],"domain_scores_gemma":[0.99897355,0.000031740565,0.00045990676,0.0000861347,0.0004178923,0.00003076239],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016639664,0.00026990735,0.0003044602,0.00020065419,0.000064639746,0.00006822398,0.00046325134,0.0003126503,0.00006869957],"category_scores_gemma":[0.000059858834,0.00016966905,0.000117094234,0.00028899222,0.000280653,0.0002938571,0.00011094381,0.00041398933,0.000019962852],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031741313,0.00019687787,0.025038136,0.005618343,0.0007166546,1.5892877e-7,0.0036086813,0.003884125,0.4236182,0.2966997,0.19120564,0.049096074],"study_design_scores_gemma":[0.0054486496,0.000460142,0.02237475,0.021972466,0.0005968161,0.0004467801,0.0040806076,0.041723356,0.763204,0.033093333,0.103710495,0.0028886339],"about_ca_topic_score_codex":0.000012295163,"about_ca_topic_score_gemma":0.000003025542,"teacher_disagreement_score":0.5164287,"about_ca_system_score_codex":0.00019699408,"about_ca_system_score_gemma":0.000031434618,"threshold_uncertainty_score":0.69189024},"labels":[],"label_agreement":null},{"id":"W4237480379","doi":"10.1109/wsc.1994.717498","title":"A resource based simulation approach with application in earthmoving/strip mining","year":2005,"lang":"en","type":"article","venue":"Proceedings of Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Field (mathematics); Resource (disambiguation); Oil sands; Computer science; Construction engineering; Engineering; Systems engineering; Civil engineering; Industrial engineering; Mining engineering","score_opus":0.014747934390472107,"score_gpt":0.22188983619317618,"score_spread":0.20714190180270406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237480379","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55492896,0.000015685233,0.43240187,0.00005483885,0.000018087341,0.00027264093,0.0000023556495,0.00017420742,0.012131378],"genre_scores_gemma":[0.988306,5.960622e-7,0.011480307,0.000027960243,0.00007089234,0.00004088209,0.000014312547,0.000020086216,0.000038950904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990605,0.000004658375,0.0003648714,0.00022192992,0.00020148678,0.00014655014],"domain_scores_gemma":[0.99941415,0.000059104186,0.00011962531,0.00007739737,0.0002895071,0.0000402207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001309008,0.00015127109,0.00016127342,0.0002499855,0.000031333202,0.00005934934,0.00010700425,0.000096688505,0.00002330092],"category_scores_gemma":[0.000029139776,0.00014877238,0.000029526465,0.00033948355,0.00004244169,0.0004892503,0.000009469003,0.00013290979,0.0000041311355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055918903,0.000026006765,0.012066649,0.00006505461,0.0000068958498,3.2181088e-8,0.00064547383,0.9499385,0.0016598318,0.0008075721,0.000013087133,0.034714982],"study_design_scores_gemma":[0.00054207386,0.000035984413,0.005580211,0.00009952686,0.000009242442,0.0000011007234,0.00037650662,0.9893552,0.0024359527,0.0000430841,0.0013648876,0.00015624819],"about_ca_topic_score_codex":0.0000041443277,"about_ca_topic_score_gemma":0.000010605796,"teacher_disagreement_score":0.43337706,"about_ca_system_score_codex":0.00006480443,"about_ca_system_score_gemma":0.00001965342,"threshold_uncertainty_score":0.60667616},"labels":[],"label_agreement":null},{"id":"W4237779927","doi":"10.11159/csee21","title":"Proceedings of the 6th World Congress on Civil, Structural, and Environmental Engineering","year":2021,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Foundation","keywords":"Computer science; Political science; Engineering ethics; Engineering","score_opus":0.004812022628021996,"score_gpt":0.1792163040976367,"score_spread":0.1744042814696147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237779927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98106575,0.0030700075,0.0000047327085,0.00012217429,0.00833958,0.0010496973,0.0007237521,0.000146586,0.0054777],"genre_scores_gemma":[0.9873958,0.0011133945,0.00016299728,0.000048270602,0.00034537894,0.00008217508,0.00006213515,0.00020477119,0.010585067],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9967355,0.000008352399,0.00092082575,0.0008392709,0.00081791764,0.00067809474],"domain_scores_gemma":[0.99881667,0.000102033504,0.00051332056,0.00031789392,0.00003389879,0.0002161719],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001174619,0.0011773151,0.0010226404,0.00048163396,0.00028907706,0.00024397897,0.0007498241,0.00035767362,0.00047448184],"category_scores_gemma":[0.00002787873,0.0008997455,0.00033563335,0.0004603283,0.0004853656,0.0004559696,0.00045665912,0.0014274048,0.0000072572684],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040663593,0.00014819966,0.01508473,0.010794267,0.0030993607,0.000009302143,0.0013664172,0.15257111,0.73270595,0.013381191,0.0615775,0.008855363],"study_design_scores_gemma":[0.004507452,0.00045238715,0.03687324,0.012866326,0.0012030377,0.00058272673,0.0023781166,0.13050385,0.70946205,0.00036156955,0.09484997,0.005959311],"about_ca_topic_score_codex":0.000012671394,"about_ca_topic_score_gemma":0.000029542296,"teacher_disagreement_score":0.033272468,"about_ca_system_score_codex":0.0003526668,"about_ca_system_score_gemma":0.00001554913,"threshold_uncertainty_score":0.9993453},"labels":[],"label_agreement":null},{"id":"W4237870445","doi":"10.1139/l2012-096","title":"Special Issue on Construction Engineering and Management / Numéro spécial consacré à la gestion et au génie de la construction","year":2012,"lang":"fr","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Construction engineering; Civil engineering","score_opus":0.0060303010861157864,"score_gpt":0.1924436943755702,"score_spread":0.18641339328945442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237870445","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15497811,0.011909423,0.24339707,0.0035156605,0.17487936,0.0009785887,0.00020660681,0.00036753784,0.40976763],"genre_scores_gemma":[0.9476672,0.0011034148,0.0146675045,0.00004510529,0.036172695,0.000010374529,0.0000067192395,0.00010241766,0.00022457997],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982755,0.00012633823,0.00055120175,0.00016078503,0.00021909877,0.00066706125],"domain_scores_gemma":[0.9985274,0.00022977982,0.0001567189,0.0001318548,0.00009580914,0.00085841794],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009173391,0.00036431642,0.00034314021,0.00081209623,0.0001245228,0.00021455465,0.00011168762,0.0004816342,0.0010906411],"category_scores_gemma":[0.00017544763,0.00045589553,0.00012650651,0.0002897316,0.00021431303,0.0007079657,0.000011313664,0.0010640245,0.000020379955],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005166461,0.00004119383,0.0072986367,0.000984417,0.0006428813,0.00033932625,0.0039210333,0.31111744,0.0008599768,0.4460064,0.031167582,0.19756947],"study_design_scores_gemma":[0.001291833,0.00011324342,0.01771277,0.0019645593,0.00029361766,0.012073175,0.00097239186,0.015132492,0.00079230004,0.0007365412,0.9481591,0.000758004],"about_ca_topic_score_codex":0.0006149572,"about_ca_topic_score_gemma":0.0031853484,"teacher_disagreement_score":0.9169915,"about_ca_system_score_codex":0.0012663051,"about_ca_system_score_gemma":0.00036805795,"threshold_uncertainty_score":0.9998225},"labels":[],"label_agreement":null},{"id":"W4237949447","doi":"10.18280/ijsdp.160420","title":"A Review on Key Performance Indicators for Measuring Real Estate Project Success","year":2021,"lang":"en","type":"review","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Schedule; Systematic review; Performance indicator; Competence (human resources); Critical success factor; Business; Success factors; Project manager; Process management; Quality (philosophy); Project management; Computer science; Marketing; Operations management; Engineering management; Engineering; Management; Political science; Finance; Economics; Systems engineering","score_opus":0.03691884842189791,"score_gpt":0.30435272372898525,"score_spread":0.26743387530708734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237949447","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014921313,0.99505776,0.00033739823,0.000011019962,0.0007981174,0.0003336596,0.000005648659,0.000024119836,0.0019401611],"genre_scores_gemma":[0.00013826166,0.9983054,0.0009319518,0.000020556972,0.00024949474,0.00006676659,0.000073135634,0.000028240522,0.00018620523],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.998563,0.000030923147,0.0007632887,0.00013285289,0.00031135447,0.00019859929],"domain_scores_gemma":[0.99887085,0.000097430064,0.000410323,0.000053413685,0.00051515026,0.000052811283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005342796,0.00024109437,0.000645321,0.0007491397,0.000087478955,0.00012661768,0.00023188096,0.0001046715,0.00000854739],"category_scores_gemma":[0.00008095006,0.00019723189,0.00013813807,0.0002338486,0.000014553879,0.00026213937,0.000031174448,0.0003433076,8.2896736e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011300818,0.000006870337,0.000032891156,0.019238284,0.00039035745,0.00015797355,0.00056285737,0.00007007641,3.95459e-8,0.00017394205,0.001254797,0.9781006],"study_design_scores_gemma":[0.00018392203,0.000023051221,0.00001496896,0.06584421,0.00011179296,0.00027742065,0.0007029507,0.000034177407,0.000010934873,0.0000033970748,0.93259394,0.0001992305],"about_ca_topic_score_codex":0.000002436235,"about_ca_topic_score_gemma":4.2695353e-7,"teacher_disagreement_score":0.9779014,"about_ca_system_score_codex":0.00037450454,"about_ca_system_score_gemma":0.00066911353,"threshold_uncertainty_score":0.8042883},"labels":[],"label_agreement":null},{"id":"W4238377218","doi":"10.1108/pm.2002.11320bab.003","title":"Construction begins 2002 on back foot - RICS consstruction survey, fourth quarter 2001","year":2002,"lang":"en","type":"article","venue":"Property Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Foot (prosody); Geography; Art; Archaeology","score_opus":0.03208217496111675,"score_gpt":0.1984329297171701,"score_spread":0.16635075475605338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238377218","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021688452,0.00027746183,0.052424565,0.0009212571,0.006053411,0.0013743679,0.000067565896,0.0010370942,0.9161558],"genre_scores_gemma":[0.96060956,0.0014179663,0.009582031,0.00032205295,0.0004362479,0.00017960684,0.000082171195,0.0001000571,0.027270308],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987878,0.000065832945,0.0002999518,0.0002859632,0.00025052327,0.00030993752],"domain_scores_gemma":[0.9994754,0.00001574223,0.00005106663,0.00030432642,0.00007150204,0.00008194434],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00015278987,0.00023154756,0.00016519008,0.000189799,0.000119060365,0.00010090403,0.000119132426,0.000094434385,0.0043941126],"category_scores_gemma":[0.000007678174,0.00017540378,0.000061648156,0.00030076894,0.0000767797,0.00021727182,0.000020212792,0.00018997533,0.0021515999],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035043064,0.00010006371,0.0022636084,0.000159169,0.00023014621,0.000006910165,0.0001126033,0.0051274383,0.0000897088,0.0045214854,0.36876452,0.6185893],"study_design_scores_gemma":[0.0020421373,0.00033565098,0.015955793,0.00014724753,0.00012118601,0.000111351605,0.0006377133,0.290671,0.00092987134,0.0005459256,0.6873663,0.0011358572],"about_ca_topic_score_codex":0.000048258968,"about_ca_topic_score_gemma":0.000090650865,"teacher_disagreement_score":0.9389211,"about_ca_system_score_codex":0.0001495458,"about_ca_system_score_gemma":0.0000030564177,"threshold_uncertainty_score":0.99862534},"labels":[],"label_agreement":null},{"id":"W4238395569","doi":"10.1145/1094855.1094878","title":"Agile environments...","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Professional Engineers Ontario","funders":"","keywords":"Agile software development; Work (physics); Culture change; Organizational culture; Business; Engineering management; Computer science; Knowledge management; Operations management; Engineering; Process management; Public relations; Software engineering; Sociology; Political science","score_opus":0.004107342676813589,"score_gpt":0.16599578985404737,"score_spread":0.16188844717723377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238395569","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09532846,0.00015937065,0.07466323,0.00019272679,0.00029547294,0.000037995946,0.0000010763208,0.0003429667,0.8289787],"genre_scores_gemma":[0.9930359,0.000015972522,0.0017582824,0.000055814733,0.00007130819,0.000003064768,0.000001223586,0.000003442535,0.005054993],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99988264,8.621531e-7,0.00003417862,0.00002324794,0.00002381757,0.000035246157],"domain_scores_gemma":[0.99994814,0.0000013316643,0.0000015617719,0.00003640438,7.242067e-7,0.000011845496],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0000063022735,0.00002226372,0.00001549889,0.000009981177,0.000008490742,0.000004434253,0.000014405079,0.000014450881,0.0019077607],"category_scores_gemma":[3.0612264e-7,0.00001988266,0.000008391226,0.000013177953,0.0000048241277,0.000053311956,0.0000013894496,0.000021264157,0.0007710535],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.9394324e-7,0.0000074568457,0.00038265006,0.000001986895,0.000011458132,1.8321225e-7,0.00006218754,0.009823678,0.034663323,0.030803358,0.027325315,0.8969178],"study_design_scores_gemma":[0.0000503164,0.0000020287027,0.0006424674,6.2889103e-7,0.0000012303715,0.0000030887463,0.000021064283,0.019525956,0.044860445,0.00012425854,0.93472487,0.000043676446],"about_ca_topic_score_codex":7.318039e-7,"about_ca_topic_score_gemma":0.0000044393437,"teacher_disagreement_score":0.90739954,"about_ca_system_score_codex":0.000013472617,"about_ca_system_score_gemma":5.1625193e-7,"threshold_uncertainty_score":0.9990046},"labels":[],"label_agreement":null},{"id":"W4238980485","doi":"10.1109/wsc.1995.478892","title":"Applications of simulation in progress reporting and control","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference Proceedings, 1995.","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Control (management); Discrete event simulation; Resource (disambiguation); Data modeling; Software engineering; Systems engineering; Simulation; Engineering","score_opus":0.016018663581950577,"score_gpt":0.26920748382419774,"score_spread":0.25318882024224715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238980485","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4984782,0.0002200936,0.49662486,0.00022706922,0.00009174679,0.00070956437,0.0000069968087,0.00026338955,0.0033780998],"genre_scores_gemma":[0.9982932,0.0000063694056,0.0014409398,0.000019042836,0.00010448279,0.000085834974,0.000006336402,0.000014009857,0.000029782012],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998762,0.000005035022,0.0007868062,0.00018328801,0.00013045619,0.00013241255],"domain_scores_gemma":[0.9992327,0.000043979704,0.0003250531,0.000069137386,0.00028837105,0.000040753443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018720167,0.0001248073,0.00018837152,0.00019152304,0.00003598732,0.000060045306,0.000062043495,0.000093818875,0.000046475856],"category_scores_gemma":[0.00006600803,0.00012947303,0.000029913133,0.00020108222,0.000060857245,0.00046243225,0.000011097576,0.00012681403,0.0000043929963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003577925,0.0000397574,0.14197539,0.0001733434,0.000027901724,2.171543e-7,0.0020403916,0.45409402,0.0023550899,0.00572621,0.000016236016,0.39351565],"study_design_scores_gemma":[0.00042266925,0.000016272472,0.011404539,0.000076700286,0.0000115465255,0.0000029215344,0.00024327249,0.9834022,0.0009911248,0.0006362798,0.0026665702,0.00012592576],"about_ca_topic_score_codex":0.0000031063773,"about_ca_topic_score_gemma":0.000012356354,"teacher_disagreement_score":0.52930814,"about_ca_system_score_codex":0.000046233974,"about_ca_system_score_gemma":0.000014252336,"threshold_uncertainty_score":0.52797574},"labels":[],"label_agreement":null},{"id":"W4239115533","doi":"10.1109/wsc.2014.7020173","title":"BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication","year":2014,"lang":"en","type":"article","venue":"Proceedings of the Winter Simulation Conference 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fabrication; Resource (disambiguation); Computer science; Plan (archaeology); Control (management); Job shop; Engineering; Manufacturing engineering; Job shop scheduling; Flow shop scheduling; Embedded system","score_opus":0.0475459947325544,"score_gpt":0.2793401753914601,"score_spread":0.23179418065890572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4239115533","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6323977,0.00000546318,0.36103842,0.00013669132,0.00049465185,0.00032219366,0.000008367409,0.00010727382,0.005489227],"genre_scores_gemma":[0.9638598,2.119002e-7,0.035896145,0.000057694397,0.000105718216,0.000017321912,0.000016367798,0.000017494232,0.000029243169],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989326,0.000012453291,0.00039736234,0.00026349066,0.00023355609,0.00016055608],"domain_scores_gemma":[0.99924976,0.000042070355,0.0001478355,0.00024021829,0.0002785968,0.00004152968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030477403,0.00014965635,0.0001619917,0.00015791772,0.00005826229,0.00009969434,0.0005361639,0.000068512156,0.000021572896],"category_scores_gemma":[0.00023015865,0.0001247249,0.000030111423,0.00022524489,0.00003313974,0.00051376293,0.00009667227,0.00012222343,0.0000068936056],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051872783,0.000025850488,0.10556519,0.0003501312,0.000036000496,1.8476452e-8,0.0016012888,0.7919982,0.013723303,0.0076989853,0.0011668561,0.07778227],"study_design_scores_gemma":[0.00027509037,0.000015533598,0.027923148,0.00015774563,0.000011790928,5.784976e-7,0.00017830246,0.9688524,0.0018415459,0.0004768327,0.00013625338,0.00013077576],"about_ca_topic_score_codex":0.000012356736,"about_ca_topic_score_gemma":0.0000075649937,"teacher_disagreement_score":0.3314621,"about_ca_system_score_codex":0.000055417615,"about_ca_system_score_gemma":0.00001545185,"threshold_uncertainty_score":0.50861335},"labels":[],"label_agreement":null},{"id":"W4240105298","doi":"10.1109/ihtc.2017.8058164","title":"The 3rd IEEE Canada International Humanitarian Technology Conference (IHTC 2017) Student Design Competition","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Competition (biology); Computer science; Engineering; Aeronautics","score_opus":0.021533904899765012,"score_gpt":0.23534785063206493,"score_spread":0.21381394573229992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240105298","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11173003,0.00015992446,0.5236489,0.01298879,0.019587148,0.0005738622,0.000027521988,0.0006693349,0.33061448],"genre_scores_gemma":[0.9983874,0.00004440005,0.0003909041,0.00002583668,0.00008725657,0.00002397702,0.0000029773585,0.000005038622,0.0010322181],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995925,0.000007619718,0.000109242064,0.0000752661,0.0001211524,0.00009422007],"domain_scores_gemma":[0.9996031,0.000017346509,0.000035910438,0.0002275996,0.00009665699,0.000019366167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005776038,0.000066213994,0.00004990103,0.000028976952,0.00041602083,0.00018444113,0.00038073183,0.000044417295,0.00015545287],"category_scores_gemma":[0.000012831827,0.000050151466,0.000011594498,0.000014869692,0.00007577368,0.00010159127,0.000018887542,0.00010970122,0.000022314907],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075102243,0.000010983034,0.0019825285,0.0000038821267,0.00011128839,0.0000076929955,0.00008051964,0.0011212023,0.0029632263,0.9335045,0.027275829,0.032930806],"study_design_scores_gemma":[0.0022503496,0.00017290721,0.0817439,0.00015390707,0.00007726235,0.0002282644,0.0070808376,0.17196417,0.06563333,0.053340454,0.6159265,0.0014281289],"about_ca_topic_score_codex":0.017658286,"about_ca_topic_score_gemma":0.556348,"teacher_disagreement_score":0.88665736,"about_ca_system_score_codex":0.00010757872,"about_ca_system_score_gemma":0.00006781762,"threshold_uncertainty_score":0.9888832},"labels":[],"label_agreement":null},{"id":"W4240200891","doi":"10.2172/822911","title":"ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM","year":2004,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Combustion; Quarter (Canadian coin); Fluidized bed combustion; Engineering; Waste management; Work (physics); Fluidized bed; Environmental science; Mechanical engineering","score_opus":0.00436543696027485,"score_gpt":0.18344140084284233,"score_spread":0.17907596388256747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240200891","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94021904,0.0027485013,0.033411354,0.000026704467,0.0022782113,0.0016566521,0.0005094488,0.0025128121,0.01663727],"genre_scores_gemma":[0.99842817,0.000061300416,0.0011143398,0.0000030896563,0.00009400878,0.000084452295,0.00013975392,0.00005066466,0.000024204644],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99867046,0.00002193016,0.0004817397,0.00023484505,0.00042481313,0.00016620246],"domain_scores_gemma":[0.9993277,0.000010341035,0.00018864877,0.000300777,0.00012212324,0.000050399325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016602407,0.00025701828,0.00042801123,0.00029974608,0.000045264598,0.000023607092,0.00009325342,0.00046224607,0.000059699658],"category_scores_gemma":[0.0000075612807,0.00022515949,0.000047988317,0.000195217,0.0000868647,0.00014422968,0.0000085240645,0.0002875989,0.0000051930083],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027886644,0.00063898053,0.017344136,0.010978564,0.0039986838,0.00035758907,0.0006523644,0.11338935,0.6856262,0.02512424,0.0012376448,0.14037336],"study_design_scores_gemma":[0.021221539,0.0025121071,0.0023740032,0.01014316,0.0031840072,0.0064584995,0.027964765,0.053939994,0.8527662,0.00029401033,0.013051528,0.0060901823],"about_ca_topic_score_codex":0.00007876198,"about_ca_topic_score_gemma":0.000034216137,"teacher_disagreement_score":0.16713999,"about_ca_system_score_codex":0.001084266,"about_ca_system_score_gemma":0.00026922906,"threshold_uncertainty_score":0.91817373},"labels":[],"label_agreement":null},{"id":"W4241079325","doi":"10.1109/wsc.2016.7822358","title":"Modular construction system simulation incorporating off-shore fabrication and multi-mode transportation","year":2016,"lang":"en","type":"article","venue":"2016 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta; Suncor Energy Incorporated","keywords":"Modular design; Fabrication; Computer science; Shore; Modular construction; Mode (computer interface); Systems engineering; Marine engineering; Embedded system; Engineering; Operating system; Geology","score_opus":0.019399747818048093,"score_gpt":0.24343292996326366,"score_spread":0.22403318214521556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241079325","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2454282,0.000059482853,0.7525738,0.00006734829,0.0006413756,0.0003148635,0.000054123255,0.0004753571,0.00038544604],"genre_scores_gemma":[0.99488956,0.000025936053,0.004591767,0.000019209574,0.00018775626,0.000043045653,0.0000958577,0.000038268736,0.00010861413],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984832,0.00006771053,0.0006210016,0.00038022106,0.00023886097,0.0002090111],"domain_scores_gemma":[0.99878764,0.00012563111,0.0002137693,0.00025454766,0.00051596237,0.000102475635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013478109,0.00027771082,0.00024246295,0.00022265883,0.00013232982,0.000104194965,0.00009608486,0.00022336311,0.000072110684],"category_scores_gemma":[0.00004436863,0.00022989555,0.00006612231,0.00017430684,0.0001153835,0.0010971548,0.000008553501,0.00012471424,0.000056804012],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056872894,0.000019787574,0.008481763,0.0001264348,0.00006306107,0.0000012284318,0.0008454872,0.5173969,0.029746946,0.008329888,0.000029383922,0.43490222],"study_design_scores_gemma":[0.000856929,0.000031502786,0.014222563,0.0003089878,0.00003820877,0.000004024454,0.00044273242,0.98062307,0.002128954,0.0005230655,0.00051070825,0.00030928515],"about_ca_topic_score_codex":0.000017852291,"about_ca_topic_score_gemma":0.00006366431,"teacher_disagreement_score":0.74946135,"about_ca_system_score_codex":0.00018558935,"about_ca_system_score_gemma":0.000042624124,"threshold_uncertainty_score":0.9374868},"labels":[],"label_agreement":null},{"id":"W4241686141","doi":"10.1109/acsos-c52956.2021.00017","title":"4th International Workshop on Self-Organized Construction (SOCO 2021) [Organizing Committee and Program Committee]","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Engineering management; Operations research; Computer science; Library science; Political science; Engineering","score_opus":0.007985454107059177,"score_gpt":0.2238736060543729,"score_spread":0.21588815194731373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241686141","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66020906,0.0009166995,0.028516047,0.004921419,0.009390423,0.00090279226,0.000029654737,0.004360742,0.2907532],"genre_scores_gemma":[0.95791554,0.0004871759,0.039810155,0.00023192952,0.00043288886,0.00004059733,0.00007933565,0.000048310718,0.00095409],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991574,0.000034058987,0.00024318665,0.00021832154,0.0001810096,0.00016598498],"domain_scores_gemma":[0.9994798,0.000067052926,0.00003454642,0.00017900932,0.00016565809,0.00007395932],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000068633024,0.00017203223,0.00015724575,0.00009105526,0.000115351795,0.00018193602,0.0000875142,0.00013427991,0.0012676684],"category_scores_gemma":[0.000035096982,0.00017323434,0.00004276336,0.00029473656,0.00005359752,0.00019208073,0.00003856738,0.0002894563,0.000061511746],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024548592,0.00018029349,0.010952632,0.00005332703,0.000414531,0.000021985614,0.0006860006,0.00019890338,0.011632147,0.061597418,0.018154357,0.89608383],"study_design_scores_gemma":[0.007995696,0.00024887364,0.01814573,0.0006750902,0.00030892828,0.0019918496,0.01998488,0.09358296,0.211255,0.007872256,0.6351441,0.0027946518],"about_ca_topic_score_codex":0.0000071946934,"about_ca_topic_score_gemma":0.00004589139,"teacher_disagreement_score":0.8932892,"about_ca_system_score_codex":0.00009145073,"about_ca_system_score_gemma":0.000028620789,"threshold_uncertainty_score":0.9996453},"labels":[],"label_agreement":null},{"id":"W4242219550","doi":"10.1109/wsc.2013.6721681","title":"Development of a distributed construction project management game with COTS in the loop","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Loop (graph theory); Project management; Systems engineering; Engineering management; Process management; Software engineering; Engineering","score_opus":0.018801080195292356,"score_gpt":0.22456493363907987,"score_spread":0.2057638534437875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242219550","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77973104,0.000020153127,0.21508953,0.00012761119,0.00016528368,0.0008482027,0.000018856834,0.00009830803,0.0039010341],"genre_scores_gemma":[0.9929958,0.000005505638,0.0066766497,0.000019649955,0.000013219451,0.00014664704,0.00006219007,0.0000092343735,0.00007113406],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992059,0.000023722634,0.0003258122,0.00013643493,0.00015947837,0.00014867474],"domain_scores_gemma":[0.99954873,0.000024584382,0.00005731441,0.00020000519,0.0001500005,0.000019348472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005185653,0.00013656131,0.00012470689,0.00015991101,0.00004412805,0.0000728308,0.0001418813,0.000051681007,0.00026241725],"category_scores_gemma":[0.0000030881217,0.00009636718,0.00002279262,0.0003038251,0.000080434664,0.00026066686,0.000015922476,0.00011855484,0.000042157844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012983901,0.0004664606,0.059429456,0.0006293461,0.0008329761,0.000009212812,0.02590992,0.15145102,0.004718985,0.072296746,0.007205411,0.6769206],"study_design_scores_gemma":[0.002449329,0.00010962182,0.1921154,0.00058458466,0.000085992855,0.000050460523,0.013629391,0.7500591,0.0028450692,0.0020033675,0.03522575,0.00084192323],"about_ca_topic_score_codex":0.000040433577,"about_ca_topic_score_gemma":0.0003765386,"teacher_disagreement_score":0.6760787,"about_ca_system_score_codex":0.000051415896,"about_ca_system_score_gemma":0.00004010281,"threshold_uncertainty_score":0.39297393},"labels":[],"label_agreement":null},{"id":"W4242441237","doi":"10.1017/s0890060415000347","title":"AIE volume 29 issue 3 Cover and Front matter","year":2015,"lang":"en","type":"article","venue":"Artificial intelligence for engineering design analysis and manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of South Australia; George Mason University; Massachusetts Institute of Technology; Oregon State University; University of Toronto; Carnegie Mellon University; University College London; Drexel University; Boeing; Worcester Polytechnic Institute; Aalborg Universitet; Technische Universiteit Delft; Georgia Institute of Technology","keywords":"Cover (algebra); Scope (computer science); Front cover; Volume (thermodynamics); Computer science; Section (typography); Data science; Engineering; Artificial intelligence; Mechanical engineering","score_opus":0.023653263553407203,"score_gpt":0.2268657068199228,"score_spread":0.2032124432665156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242441237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034374714,0.00033878777,0.9644383,0.000057957845,0.000296443,0.0001501563,0.0000065042345,0.00013583907,0.00020130182],"genre_scores_gemma":[0.9866182,0.00004942474,0.012590611,0.000027729775,0.00015151237,0.00004064118,0.000010356112,0.000025809575,0.0004857221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916035,0.000009690793,0.00028569944,0.00021964077,0.000100993624,0.00022361134],"domain_scores_gemma":[0.999614,0.00004984695,0.000027774637,0.00013250411,0.000038191643,0.00013765563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019809746,0.00018549952,0.00023820497,0.00026526387,0.000057353285,0.00014830894,0.00006592125,0.00008429973,0.0002730007],"category_scores_gemma":[0.000017760245,0.00018187634,0.00007848063,0.000111055466,0.000029311446,0.0001962221,0.000016490114,0.00009984971,0.00018455951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024605048,0.000010124767,0.00029447567,0.00006133807,0.00046792917,0.0000018881967,0.0005656821,0.92245066,0.0017009769,0.00069481076,0.0014264517,0.07230104],"study_design_scores_gemma":[0.000032172844,0.000032457134,0.00028549202,0.000011372733,0.00025248207,0.0000051562556,0.0001701291,0.87177944,0.111201815,0.0009653196,0.01500254,0.0002615983],"about_ca_topic_score_codex":0.000044546927,"about_ca_topic_score_gemma":0.000010578134,"teacher_disagreement_score":0.9522435,"about_ca_system_score_codex":0.000041099393,"about_ca_system_score_gemma":0.0000062145446,"threshold_uncertainty_score":0.7416702},"labels":[],"label_agreement":null},{"id":"W4243031019","doi":"10.26868/25222708.2019.210271","title":"Building Performance Optimization for Operational Rule Extraction","year":2020,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"National Research Council Canada; Concordia University; Carleton University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Extraction (chemistry); Chromatography","score_opus":0.027662943291474465,"score_gpt":0.26505123461328256,"score_spread":0.2373882913218081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243031019","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27643168,0.000020944755,0.7214335,0.00030052822,0.00024985187,0.0002938736,0.000006640169,0.00046068887,0.0008023126],"genre_scores_gemma":[0.8869303,0.000016921258,0.11238671,0.00012469364,0.00038272122,0.000084272324,0.00002443662,0.000030581083,0.000019362516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990072,0.0000036200638,0.00033081876,0.00026599184,0.00019606562,0.00019625478],"domain_scores_gemma":[0.9992192,0.000046903184,0.000083569525,0.000043590473,0.0005142226,0.000092510214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010605581,0.00018150202,0.00014601403,0.00010107894,0.00022461744,0.00025081664,0.00011071313,0.00012550794,0.00016424948],"category_scores_gemma":[0.00011480832,0.00020250106,0.000050566643,0.00025779087,0.000025081445,0.0012111918,0.000012196273,0.00014809071,0.000008571282],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028090188,0.0000051302436,0.00066078664,0.000102909544,0.000012942262,3.8171063e-8,0.00026161023,0.93905735,0.020554923,0.020449607,0.00015308628,0.018713517],"study_design_scores_gemma":[0.0003626978,0.00004376345,0.00030615885,0.00004582885,0.000018055693,0.0000029572313,0.0000834947,0.9805459,0.01388989,0.0005603878,0.0039112177,0.0002296498],"about_ca_topic_score_codex":0.0000011067406,"about_ca_topic_score_gemma":1.3645763e-7,"teacher_disagreement_score":0.6104986,"about_ca_system_score_codex":0.00007828884,"about_ca_system_score_gemma":0.000035046804,"threshold_uncertainty_score":0.8257753},"labels":[],"label_agreement":null},{"id":"W4243299942","doi":"10.1109/wsc.2005.1574417","title":"Modeling Scheduling Uncertainty in Capital Construction Projects","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Winter Simulation Conference, 2005.","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Scheduling (production processes); Monte Carlo method; Work (physics); Inflation (cosmology); Cost accounting; Operations research; Industrial engineering; Engineering; Economics; Operations management; Accounting","score_opus":0.014370303414607634,"score_gpt":0.2167913146356863,"score_spread":0.20242101122107867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243299942","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9770196,0.000042740914,0.013650519,0.00006466956,0.00042215452,0.00023264103,0.000003990055,0.00012154773,0.008442147],"genre_scores_gemma":[0.9985186,0.0000051073152,0.0012323643,0.000007843875,0.000120249446,0.000015396807,0.0000038958715,0.000014594151,0.0000819623],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907124,0.000004811677,0.00040275633,0.00016175523,0.00017523754,0.0001842184],"domain_scores_gemma":[0.9995537,0.000013530854,0.00007923562,0.00006533662,0.00026621448,0.000021977905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011198858,0.00014493061,0.00015191775,0.00018377144,0.000052508563,0.00006730844,0.00013952403,0.00010502197,0.000044181004],"category_scores_gemma":[0.00002300414,0.00012155343,0.00006510264,0.00022177256,0.00006387219,0.00039548677,0.000022880806,0.00019316215,0.0000042388992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013931337,0.000010707183,0.007032367,0.000049239825,0.000008408913,3.9927727e-8,0.0002714456,0.97169363,0.0044006957,0.014862696,0.000019182426,0.0016376759],"study_design_scores_gemma":[0.00031187848,0.0000073285623,0.0007547309,0.00016017005,0.000010003003,0.0000046647947,0.0007800821,0.98803204,0.0032427378,0.0065043247,0.00006137357,0.00013064833],"about_ca_topic_score_codex":0.00007821156,"about_ca_topic_score_gemma":0.00011061534,"teacher_disagreement_score":0.021498995,"about_ca_system_score_codex":0.00009687874,"about_ca_system_score_gemma":0.00003091488,"threshold_uncertainty_score":0.49568048},"labels":[],"label_agreement":null},{"id":"W4244288987","doi":"10.1109/wsc.2012.6465326","title":"Effective strategies for simulating one-of-a-kind construction projects","year":2012,"lang":"en","type":"article","venue":"Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cumulative Environmental Management Association; University of Alberta","funders":"","keywords":"Computer science; Process (computing); Global Positioning System; Domain (mathematical analysis); Discrete event simulation; Systems engineering; Proof of concept; Event (particle physics); Software engineering; Product (mathematics); Simulation; Engineering","score_opus":0.028083989578565244,"score_gpt":0.2567512608775631,"score_spread":0.22866727129899786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244288987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8460642,0.00014365253,0.01868469,0.000075602715,0.0016669021,0.0016066093,0.000024446223,0.00028867746,0.13144518],"genre_scores_gemma":[0.996993,0.000003176096,0.002383707,0.000009063561,0.0002847074,0.000053798893,0.000002132663,0.000025986714,0.00024440803],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914116,0.0000023296386,0.00032303244,0.00013777945,0.00018656653,0.00020913305],"domain_scores_gemma":[0.9988584,0.0000556529,0.00024361514,0.000048917373,0.0007512243,0.000042183437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001775493,0.00016482463,0.00020397973,0.00012186512,0.00006768631,0.00006631324,0.00015211663,0.0001337136,0.00016868864],"category_scores_gemma":[0.0000983537,0.00013773021,0.000089752626,0.00021344329,0.000106033884,0.0010722174,0.0000320517,0.00014865407,0.000011645404],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028757393,0.00020915772,0.07242232,0.0041721542,0.00055598776,2.4106061e-8,0.013325554,0.0052340273,0.20708862,0.55831724,0.008242598,0.13014475],"study_design_scores_gemma":[0.0020328595,0.00034148042,0.020245938,0.001805534,0.00045721323,0.000023072502,0.010336013,0.5338453,0.37631455,0.03311832,0.020188428,0.0012912962],"about_ca_topic_score_codex":0.0000021995945,"about_ca_topic_score_gemma":8.6576523e-7,"teacher_disagreement_score":0.52861124,"about_ca_system_score_codex":0.000051192037,"about_ca_system_score_gemma":0.000027458696,"threshold_uncertainty_score":0.5616475},"labels":[],"label_agreement":null},{"id":"W4244707463","doi":"10.32920/ryerson.14665020.v1","title":"Climate Change Impact on Design and Building Criteria of Infrastructure Assets - Simulation Model","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"","keywords":"Climate change; Investment (military); Asset (computer security); Contingency plan; Simulation modeling; Computer science; Contingency; Control (management); Environmental resource management; Environmental science; Environmental economics; Operations research; Business; Risk analysis (engineering); Economics; Engineering; Microeconomics","score_opus":0.03574128903893163,"score_gpt":0.30658048957534156,"score_spread":0.2708392005364099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244707463","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48261467,0.00012821546,0.5162541,0.000007691295,0.00032783984,0.00019310348,0.00003608534,0.00010923033,0.00032903216],"genre_scores_gemma":[0.9646264,0.00018611175,0.034994587,0.000014503731,0.00007927044,0.000023715793,0.000046671226,0.000026169277,0.0000025844222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993025,0.000029757031,0.00023220458,0.00019487277,0.00011145314,0.00012923578],"domain_scores_gemma":[0.9995861,0.000040419895,0.00006400767,0.0001871463,0.00007961554,0.00004269633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008681763,0.00021924356,0.00024575932,0.00013740592,0.000026319354,0.00008833443,0.000055951503,0.00029741594,0.00011264969],"category_scores_gemma":[0.000010553629,0.00019020918,0.00007049438,0.000059952927,0.0000152455905,0.00014938781,0.000061394225,0.00027075165,4.5560813e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000133794165,0.0000031441066,0.00012799019,0.00016272864,0.000029385204,4.7365393e-7,0.00020922747,0.97360307,0.0051642363,0.00055555976,0.000035980138,0.020094827],"study_design_scores_gemma":[0.0000911938,0.00001803594,0.0031580788,0.0002191304,0.000024630726,0.0000032258818,0.00002582069,0.9894474,0.0049279127,0.0019201136,0.0000021883318,0.0001622601],"about_ca_topic_score_codex":0.000012222985,"about_ca_topic_score_gemma":0.0000015031654,"teacher_disagreement_score":0.4820117,"about_ca_system_score_codex":0.0000673553,"about_ca_system_score_gemma":0.000019712554,"threshold_uncertainty_score":0.7756505},"labels":[],"label_agreement":null},{"id":"W4245145790","doi":"10.1139/cjce-2019-0682","title":"Lean and BIM meet social sciences: new perspectives in construction engineering and management","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Engineering; Lean construction; Construction engineering; Building information modeling; Engineering management; Architectural engineering; Construction industry; Operations management","score_opus":0.012621540946423298,"score_gpt":0.18514717013220397,"score_spread":0.17252562918578068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245145790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84104013,0.014135321,0.13436353,0.0024825784,0.0016637865,0.00029545682,0.000012114143,0.00018196451,0.005825108],"genre_scores_gemma":[0.9972152,0.00019040785,0.002358546,0.000019418092,0.00019975269,8.939984e-7,1.9249697e-7,0.000013146452,0.000002456605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994829,0.0000031965285,0.0001853467,0.00008654077,0.00007553764,0.00016646285],"domain_scores_gemma":[0.99968725,0.000010294552,0.000025280917,0.000022638695,0.000020202364,0.00023435311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000078185716,0.00010311688,0.00013416931,0.00036007699,0.00004523674,0.00006754991,0.000059410522,0.0000446946,0.000023141165],"category_scores_gemma":[0.000022164502,0.00011489951,0.00002394111,0.0002766804,0.000044687167,0.00022075667,0.0000052468345,0.00015578052,3.563493e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012423861,0.0000040540613,0.0058929315,0.00056796067,0.00023118037,0.00020389665,0.012463114,0.64841217,0.0032828276,0.2942337,0.002539881,0.032155838],"study_design_scores_gemma":[0.0036969662,0.00032076275,0.04001635,0.0011214691,0.0001664717,0.0021205468,0.020576192,0.8877634,0.0010139385,0.0021655154,0.039360765,0.0016776631],"about_ca_topic_score_codex":0.00008509162,"about_ca_topic_score_gemma":0.0039755474,"teacher_disagreement_score":0.29206818,"about_ca_system_score_codex":0.000089943096,"about_ca_system_score_gemma":0.00006722541,"threshold_uncertainty_score":0.4685466},"labels":[],"label_agreement":null},{"id":"W4245837393","doi":"10.32920/ryerson.14656428","title":"The development of a geo-referencing system for machine controlled construction equipment","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Excavator; Real-time computing; Kinematics; Position (finance); Systems engineering; Engineering; Mechanical engineering","score_opus":0.01454661700909382,"score_gpt":0.2191094785004344,"score_spread":0.2045628614913406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245837393","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10678706,0.0014696942,0.87379235,0.000042344505,0.0053231027,0.0014609066,0.000026243082,0.0003591385,0.010739153],"genre_scores_gemma":[0.9584467,0.000040102652,0.04044557,0.000002725148,0.00007984966,0.00072616787,0.00008391167,0.00002139591,0.00015357223],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986467,0.000030006415,0.0007974575,0.00018631981,0.00017842841,0.00016110405],"domain_scores_gemma":[0.99918246,0.00011232642,0.00017688432,0.00023454962,0.00025878087,0.000035022174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031824433,0.0002129971,0.0004339388,0.000071575465,0.0001499244,0.00009781227,0.0001283674,0.00018879227,0.000032214743],"category_scores_gemma":[0.000023559383,0.00014582516,0.00016773425,0.000051556133,0.000030653075,0.00003068487,0.00007436293,0.00021610981,0.0000016558066],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054093776,0.00004890256,0.00024947,0.006369463,0.004090956,0.0000016686248,0.00294599,0.037821256,0.020442419,0.12382077,0.0003844019,0.80328375],"study_design_scores_gemma":[0.009245423,0.000058861395,0.00036129032,0.0024117245,0.0005475255,0.00010001803,0.02430879,0.74015397,0.21331142,0.0013323082,0.006866577,0.0013020865],"about_ca_topic_score_codex":0.000021263852,"about_ca_topic_score_gemma":0.00035347702,"teacher_disagreement_score":0.85165966,"about_ca_system_score_codex":0.00028672355,"about_ca_system_score_gemma":0.00026776735,"threshold_uncertainty_score":0.5946577},"labels":[],"label_agreement":null},{"id":"W4245880842","doi":"10.32920/ryerson.14654898","title":"The Use of Aerogel-Enhanced Blanket for Thermal Bridging Correction in Concrete and Steel Buildings","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Blanket; Aerogel; Thermal; Bridging (networking); Roof; Structural engineering; Materials science; Civil engineering; Environmental science; Architectural engineering; Computer science; Mechanical engineering; Composite material; Engineering","score_opus":0.018379961113977418,"score_gpt":0.21968138277461793,"score_spread":0.20130142166064052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245880842","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8768225,0.00027151004,0.12050107,0.00002983786,0.0016534727,0.00027541717,0.000008705674,0.000076046126,0.00036144842],"genre_scores_gemma":[0.9968476,0.0002648134,0.0024624874,0.000014489484,0.00006346394,0.00008536957,0.000019161702,0.000017355991,0.00022524444],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993902,0.000020639296,0.00025536132,0.00015556623,0.00006730958,0.000110953864],"domain_scores_gemma":[0.99954474,0.00014666644,0.00006275702,0.00013977283,0.00008800705,0.000018041124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001014155,0.00012420295,0.00017185014,0.000052614636,0.00004067239,0.00012373968,0.00005368019,0.00014740114,0.000012660092],"category_scores_gemma":[0.000044464894,0.00010126529,0.00005663911,0.000058464226,0.000040344443,0.00009989905,0.000044297998,0.00022810508,1.903527e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013595498,0.0000055092637,0.0017932657,0.0005522909,0.00028232462,0.0000012221468,0.0018467276,0.12514177,0.31783563,0.0028399932,0.0018708103,0.5476945],"study_design_scores_gemma":[0.00044988032,0.000020846192,0.0022839375,0.00035739935,0.000036343557,0.000010623513,0.0008936458,0.7573809,0.23635662,0.00006703002,0.0018685964,0.000274159],"about_ca_topic_score_codex":0.00016233334,"about_ca_topic_score_gemma":0.00025737163,"teacher_disagreement_score":0.63223916,"about_ca_system_score_codex":0.000044918972,"about_ca_system_score_gemma":0.000029108518,"threshold_uncertainty_score":0.41294786},"labels":[],"label_agreement":null},{"id":"W4246061618","doi":"10.22260/isarc2019/0014","title":"Automatic Generation of the Vertical Transportation Demands During the Construction of High-Rise Buildings Using BIM","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Transport engineering; Schedule; Elevator; Process (computing); Construction management; Engineering; Computer science; Construction engineering; Civil engineering; Scheduling (production processes); Operations management","score_opus":0.007704802908658045,"score_gpt":0.18836402889479292,"score_spread":0.18065922598613487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246061618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99844027,0.000047168956,0.00037811726,0.00010957812,0.000559244,0.00026315154,0.000006105357,0.000036109832,0.0001602506],"genre_scores_gemma":[0.9986658,0.00001073,0.0012252667,0.000005214734,0.00005780855,0.0000072998355,6.849084e-7,0.00001410169,0.000013093825],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99913013,0.000007280043,0.00039584094,0.000101789796,0.00026112757,0.00010382483],"domain_scores_gemma":[0.99951154,0.000018028293,0.00016604386,0.000113126735,0.00017643359,0.000014846933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013305742,0.00010458598,0.00015991066,0.00005747639,0.000083955354,0.000016194803,0.00019437165,0.000077417244,0.000035058012],"category_scores_gemma":[0.000026917387,0.000060906266,0.000104267245,0.00031168835,0.00015107781,0.00021398207,0.000014089473,0.00013053042,7.407419e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012832201,0.000010730918,0.03377995,0.0003912026,0.0000466524,9.256306e-9,0.00063347357,0.0036691283,0.93205875,0.027811483,0.000021541744,0.0015642467],"study_design_scores_gemma":[0.00031730536,0.00001694611,0.057212297,0.00018830544,0.000098398654,0.000012880117,0.000526869,0.089209296,0.85083264,0.0014845489,0.000017649782,0.000082871404],"about_ca_topic_score_codex":0.000041632997,"about_ca_topic_score_gemma":0.0000058343894,"teacher_disagreement_score":0.08554017,"about_ca_system_score_codex":0.000047538855,"about_ca_system_score_gemma":0.00001825774,"threshold_uncertainty_score":0.24836855},"labels":[],"label_agreement":null},{"id":"W4246413105","doi":"10.1017/s0890060414000717","title":"AIE volume 29 issue 1 Cover and Front matter","year":2015,"lang":"en","type":"article","venue":"Artificial intelligence for engineering design analysis and manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of South Australia; University of Cambridge; George Mason University; Massachusetts Institute of Technology; Oregon State University; University of Toronto; Carnegie Mellon University; University College London; Drexel University; Boeing; Worcester Polytechnic Institute; Aalborg Universitet; Technische Universiteit Delft; Georgia Institute of Technology","keywords":"Front cover; Volume (thermodynamics); Cover (algebra); Front (military); Environmental science; Physics; Geology; Engineering; Oceanography; Mechanical engineering; Thermodynamics","score_opus":0.02401772130387798,"score_gpt":0.22715617341201194,"score_spread":0.20313845210813397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246413105","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034191947,0.00033748668,0.9646249,0.000058185506,0.00029429924,0.00015019067,0.000006586479,0.00013600462,0.00020041397],"genre_scores_gemma":[0.9864992,0.000048917736,0.012717446,0.000027770635,0.00015028496,0.00004128201,0.000010506207,0.000025833266,0.00047879346],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991604,0.000009698131,0.00028559967,0.0002197161,0.0001009775,0.0002236249],"domain_scores_gemma":[0.99961376,0.000050196268,0.000027771186,0.00013266037,0.000037929072,0.00013766479],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000198168,0.00018552002,0.00023818585,0.00026533342,0.00005735716,0.00014807007,0.00006595384,0.000084305364,0.00027839528],"category_scores_gemma":[0.000017763992,0.00018191275,0.00007848456,0.00011108784,0.00002930981,0.00019610359,0.000016499482,0.00009986575,0.00018298977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024516512,0.000010139697,0.0002944851,0.00006059478,0.0004687489,0.0000018725543,0.00056628085,0.92312104,0.0016995082,0.00069900975,0.0014763833,0.07157743],"study_design_scores_gemma":[0.000031901305,0.000032568692,0.00028752178,0.0000114183085,0.00025487266,0.0000052065084,0.00017116444,0.87339765,0.10976688,0.00096535805,0.014813299,0.00026218628],"about_ca_topic_score_codex":0.000044153723,"about_ca_topic_score_gemma":0.00001052201,"teacher_disagreement_score":0.9523072,"about_ca_system_score_codex":0.000040971758,"about_ca_system_score_gemma":0.000006211846,"threshold_uncertainty_score":0.74181867},"labels":[],"label_agreement":null},{"id":"W4246626565","doi":"10.1520/stp47525s","title":"Development of a Canadian National Standard on Design for Disassembly and Adaptability for Buildings","year":2009,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; Natural Resources Canada","funders":"","keywords":"Adaptability; Architectural engineering; Engineering; Computer science; Economics; Management","score_opus":0.03662673246795301,"score_gpt":0.22780646892069065,"score_spread":0.19117973645273764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246626565","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004299109,0.00010588066,0.64702123,0.00014213397,0.00025934432,0.0013522367,0.00048326235,0.00008777337,0.3501182],"genre_scores_gemma":[0.05289797,0.000057221412,0.8962193,0.00011379326,0.00018988736,0.0002686585,0.00019812588,0.00008922649,0.049965825],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994405,0.0000012287528,0.000218237,0.00012971129,0.00011591506,0.00009441947],"domain_scores_gemma":[0.9996055,0.000061517116,0.000032296648,0.0000480583,0.0001884138,0.00006424746],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014418495,0.000133834,0.00015379742,0.00024102234,0.000054484233,0.000014273368,0.00003506046,0.00014876307,0.00004161083],"category_scores_gemma":[0.000016805147,0.00012823836,0.000042781776,0.00001600873,0.000017682487,0.00003148535,0.0000017028572,0.000049617996,5.9861696e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051713898,0.000001724391,5.379004e-7,0.00007230881,0.00005125456,3.7575955e-8,0.00008340118,0.00026852277,0.00019128328,0.77169555,0.0040142816,0.2235694],"study_design_scores_gemma":[0.00031716842,0.000105882646,0.000025356045,0.000088607194,0.000019568828,0.000001685768,0.000024416953,0.0016232306,0.0055323816,0.043563657,0.9484448,0.00025324107],"about_ca_topic_score_codex":0.00010824466,"about_ca_topic_score_gemma":0.015909966,"teacher_disagreement_score":0.94443053,"about_ca_system_score_codex":0.00030187322,"about_ca_system_score_gemma":0.00035774554,"threshold_uncertainty_score":0.88781345},"labels":[],"label_agreement":null},{"id":"W4246995314","doi":"10.1109/wsc.2012.6465160","title":"Towards the smart construction site: Improving productivity and safety of construction projects using multi-agent systems, real-time simulation and automated machine control","year":2012,"lang":"en","type":"article","venue":"Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Productivity; Building information modeling; Control (management); Computer science; Construction site safety; Systems engineering; Construction industry; Construction management; Risk analysis (engineering); Engineering; Construction engineering; Civil engineering; Artificial intelligence; Operations management","score_opus":0.023146256105421734,"score_gpt":0.24473743795098257,"score_spread":0.22159118184556084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246995314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9856075,0.00024068203,0.009310779,0.000064019565,0.0008389829,0.0010776274,0.000038284445,0.00030728348,0.0025148203],"genre_scores_gemma":[0.9979876,0.000017350894,0.001720471,0.000004096642,0.00014056162,0.000014823613,0.0000033895606,0.00002502354,0.000086648695],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99891454,0.000012498494,0.00044081264,0.00020500319,0.00022776812,0.00019935778],"domain_scores_gemma":[0.9987696,0.000041815547,0.00039496116,0.00007601954,0.00066102075,0.000056594792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039820408,0.00021151977,0.00026232924,0.00012795071,0.00014316413,0.00009203469,0.000097724165,0.00014090615,0.00003959002],"category_scores_gemma":[0.0001284337,0.000152428,0.000046751993,0.00022497703,0.00024131831,0.00093456777,0.000053871034,0.00017637212,0.0000035780895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055343466,0.00017417474,0.30234697,0.0039221942,0.00057911815,1.0535876e-7,0.008901105,0.032349557,0.56265455,0.021433981,0.00045945932,0.06662534],"study_design_scores_gemma":[0.00046011756,0.000024157307,0.014793111,0.00017492802,0.000116104195,0.00003336682,0.00039736013,0.9787514,0.004738951,0.00005455087,0.00028731214,0.00016860984],"about_ca_topic_score_codex":0.00005012261,"about_ca_topic_score_gemma":0.000001749123,"teacher_disagreement_score":0.9464019,"about_ca_system_score_codex":0.00008329686,"about_ca_system_score_gemma":0.00003137511,"threshold_uncertainty_score":0.62158334},"labels":[],"label_agreement":null},{"id":"W4247774183","doi":"10.1109/wsc.2000.899185","title":"Simphony-an integrated environment for construction simulation","year":2002,"lang":"en","type":"article","venue":"2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Animation; Software engineering; Representation (politics); Systems engineering; User Friendly; Human–computer interaction; Engineering; Programming language; Computer graphics (images)","score_opus":0.02444812744051181,"score_gpt":0.22831695077220487,"score_spread":0.20386882333169307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247774183","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31820494,0.000026827089,0.67081696,0.00013928964,0.0015340282,0.0012989155,0.00008408497,0.0011477218,0.006747235],"genre_scores_gemma":[0.97132695,0.000041424184,0.02660274,0.00013197609,0.00049858354,0.00016814025,0.00016023488,0.000083771396,0.0009862089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99776965,0.000020567975,0.0007724014,0.00060593814,0.00036180808,0.0004696408],"domain_scores_gemma":[0.9985016,0.00010090299,0.00021461736,0.00024036011,0.00073947606,0.00020306058],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017026457,0.00049048243,0.00036440653,0.00032512774,0.00023608975,0.00036781174,0.0002553406,0.0003616054,0.00258289],"category_scores_gemma":[0.000096556665,0.0005093947,0.00013108422,0.0002718515,0.0001453844,0.001600956,0.000026439633,0.0002190514,0.00046641455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016625212,0.00013782867,0.0010744348,0.00014865882,0.00012025497,6.4063767e-7,0.002870127,0.6548348,0.026767258,0.0022189657,0.0012920742,0.3103687],"study_design_scores_gemma":[0.00087341154,0.00020287978,0.0002465214,0.00006896236,0.00005693505,0.000006696874,0.0005770921,0.9568538,0.0025590626,0.00073756976,0.03727608,0.0005410073],"about_ca_topic_score_codex":0.000010585934,"about_ca_topic_score_gemma":0.000006166486,"teacher_disagreement_score":0.65312195,"about_ca_system_score_codex":0.00045287743,"about_ca_system_score_gemma":0.00003587074,"threshold_uncertainty_score":0.9997358},"labels":[],"label_agreement":null},{"id":"W4248061455","doi":"10.29173/mocs160","title":"Automatic Estimation System of Building Frames Integrated with Structural Design Information (AutoES)","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Korea Agency for Infrastructure Technology Advancement; Ministry of Land, Infrastructure and Transport","keywords":"Schedule; Cost estimate; Estimation; Task (project management); Computer science; Industrial engineering; Software; Mistake; Unavailability; Engineering drawing; Reliability engineering; Engineering; Systems engineering","score_opus":0.007573862904187757,"score_gpt":0.18564841675592483,"score_spread":0.17807455385173707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248061455","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6544874,0.00011033427,0.3437998,0.000016541162,0.00037266256,0.00030198207,0.000010125865,0.0005131594,0.00038805004],"genre_scores_gemma":[0.8865831,0.000008600434,0.11326993,0.000008147536,0.00004260911,0.000032931282,0.000026865708,0.000020794272,0.0000070211136],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987025,0.000017541199,0.0005390399,0.00018903386,0.0003377135,0.00021416116],"domain_scores_gemma":[0.9989206,0.000018562034,0.00022695384,0.000103358936,0.00059482857,0.00013565429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022854471,0.00027569116,0.00032151322,0.00038611356,0.00012514342,0.00021019699,0.0000984472,0.00018825938,0.000015070484],"category_scores_gemma":[0.000049301616,0.00023466471,0.000043611373,0.00049496256,0.00017160315,0.0019236413,0.000017264,0.00021477137,0.0000052336686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026099742,0.000016769402,0.020703716,0.0022990098,0.00038856777,0.0000029112439,0.0038956378,0.07188695,0.007170373,0.0875223,0.0007346117,0.80511814],"study_design_scores_gemma":[0.0008188662,0.0001171159,0.0010777836,0.00034017029,0.000086663444,0.00024799898,0.0052715708,0.97704995,0.013605467,0.0007245506,0.0003622152,0.00029763664],"about_ca_topic_score_codex":0.00003698896,"about_ca_topic_score_gemma":0.0000027353135,"teacher_disagreement_score":0.905163,"about_ca_system_score_codex":0.00018262818,"about_ca_system_score_gemma":0.00006025939,"threshold_uncertainty_score":0.9569349},"labels":[],"label_agreement":null},{"id":"W4249106202","doi":"10.18260/1-2--35439","title":"Usage of Building Information Modeling for Sustainable Development Education","year":2020,"lang":"en","type":"article","venue":"2020 ASEE Virtual Annual Conference Content Access Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Sistema Nacional de Investigadores; Energy Council of Canada; Federation of Canadian Municipalities","keywords":"Building information modeling; Sustainable development; Architecture; Work (physics); Education for sustainable development; Computer science; Engineering management; Knowledge management; Engineering education; Engineering; Process management; Systems engineering; Political science","score_opus":0.037194676165786755,"score_gpt":0.25094872096447146,"score_spread":0.2137540447986847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249106202","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6810239,0.00005915684,0.31590918,0.00033911035,0.00019719807,0.00058489223,0.000019322762,0.00020955122,0.0016576764],"genre_scores_gemma":[0.99747264,0.000019711191,0.0018171075,0.00020930525,0.00011113563,0.0002000988,0.000051813586,0.000014712222,0.00010345609],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886096,0.0000033599747,0.00052371767,0.00017049472,0.000206906,0.00023455363],"domain_scores_gemma":[0.99770755,0.000014502489,0.00012856122,0.00004345704,0.0019850356,0.0001209236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012431823,0.00018306662,0.0002117697,0.00012782858,0.00011035646,0.0003120954,0.00028954278,0.000094016854,0.00003567299],"category_scores_gemma":[0.00021539288,0.0001829001,0.00005259645,0.00030625443,0.000027895112,0.0040790467,0.0000722488,0.00013802931,0.0000055184446],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006121,0.000115887226,0.0023217555,0.003974795,0.00025083526,8.082946e-7,0.04792014,0.015868794,0.033239376,0.41605735,0.013365857,0.46627232],"study_design_scores_gemma":[0.0010032742,0.00025439516,0.00042320622,0.00026676044,0.000058526468,0.000004682827,0.10049304,0.8051901,0.06846685,0.0014777349,0.021650285,0.0007111735],"about_ca_topic_score_codex":0.000021809847,"about_ca_topic_score_gemma":0.0000014505,"teacher_disagreement_score":0.7893213,"about_ca_system_score_codex":0.00007851231,"about_ca_system_score_gemma":0.00024004941,"threshold_uncertainty_score":0.74584496},"labels":[],"label_agreement":null},{"id":"W4249544461","doi":"10.1109/wsc.2010.5679011","title":"3D CAD modeling and visualization of the tunnel construction process in a distributed simulation environment","year":2010,"lang":"en","type":"article","venue":"Proceedings of the 2010 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Computer science; Process (computing); CAD; Animation; Systems engineering; Building information modeling; Software engineering; Computer animation; Solid modeling; Computer Aided Design; Simulation modeling; Process modeling; Simulation software; Software; Engineering drawing; Engineering; Work in process; Data mining; Artificial intelligence","score_opus":0.013234522916254342,"score_gpt":0.23134249177530578,"score_spread":0.21810796885905143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249544461","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9388473,0.000008222595,0.060209792,0.0000545768,0.00036806558,0.00026829433,0.0000109036955,0.000030981842,0.00020187687],"genre_scores_gemma":[0.9996632,0.000004910909,0.00026278105,0.0000051846278,0.000028630175,0.00001147201,0.0000036995352,0.0000105378795,0.000009604219],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99921733,0.000006672447,0.00036212674,0.00013879752,0.00018364115,0.000091440845],"domain_scores_gemma":[0.9994426,0.00002816307,0.00017111287,0.0000891609,0.0002482201,0.000020753992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011388486,0.00011576861,0.00012454527,0.00007337264,0.000056292363,0.000031801294,0.0001388266,0.00011299168,0.000023908773],"category_scores_gemma":[0.00008586703,0.000084102736,0.000034494762,0.00018022725,0.00012044875,0.00033316796,0.000036283785,0.0001970369,5.1549944e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017764418,0.00001308562,0.03390761,0.00008253915,0.000008619262,5.6703295e-9,0.0008795842,0.9334817,0.026177691,0.0025622745,0.0000017081595,0.002867416],"study_design_scores_gemma":[0.00023868533,0.00000793758,0.0140826125,0.00009542079,0.000015906111,0.0000019759666,0.00024247839,0.9713029,0.01168259,0.002228732,0.000017489692,0.00008325623],"about_ca_topic_score_codex":0.000010588759,"about_ca_topic_score_gemma":0.00001684411,"teacher_disagreement_score":0.060815893,"about_ca_system_score_codex":0.000025532805,"about_ca_system_score_gemma":0.000015547206,"threshold_uncertainty_score":0.34296098},"labels":[],"label_agreement":null},{"id":"W4249725610","doi":"10.1109/wsc.2013.6721676","title":"Location-aware real-time simulation framework for earthmoving projects using automated machine guidance","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Context (archaeology); Retrofitting; Identification (biology); Computer science; Systems engineering; Construction industry; Construction engineering; Engineering; Industrial engineering","score_opus":0.028289351410367494,"score_gpt":0.2809335381447453,"score_spread":0.25264418673437783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249725610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16233298,0.00005373344,0.8340676,0.00013312572,0.0004989234,0.0010249794,0.00004171835,0.0013957261,0.00045124063],"genre_scores_gemma":[0.9695988,0.0000048681554,0.02963985,0.000054440567,0.00017738299,0.00012261038,0.00011761207,0.00005671444,0.00022769658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986251,0.000038776147,0.0005196091,0.00031691996,0.00017877716,0.0003208055],"domain_scores_gemma":[0.99829143,0.00024067017,0.00013089334,0.00038616225,0.0008645987,0.00008621469],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000080185615,0.00028076107,0.00024217383,0.000230533,0.00022731196,0.00027042942,0.00017425946,0.00022804136,0.00088669715],"category_scores_gemma":[0.00010163072,0.00028798767,0.00007804067,0.00038197392,0.00005828564,0.00091324176,0.000026232019,0.00018207323,0.00026618055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075383714,0.000019288846,0.0017735156,0.000078492616,0.00004610995,1.7925112e-7,0.0004271715,0.9865643,0.0034688576,0.002019168,0.00053290004,0.0050624916],"study_design_scores_gemma":[0.00027363494,0.000027302758,0.0039844858,0.00026474826,0.000028378192,0.0000026833995,0.00008444412,0.9918648,0.000529652,0.0022542118,0.00036640538,0.00031926308],"about_ca_topic_score_codex":0.00020848004,"about_ca_topic_score_gemma":0.00007339814,"teacher_disagreement_score":0.8072658,"about_ca_system_score_codex":0.00012481114,"about_ca_system_score_gemma":0.00008438881,"threshold_uncertainty_score":0.9999572},"labels":[],"label_agreement":null},{"id":"W4249847880","doi":"10.29173/mocs180","title":"Evaluation of the Impact of Dynamic Work Stations Versus Static Work Stations in Wood Framing Prefabrication using Hybrid Simulation","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Modular design; Prefabrication; Production line; Work (physics); Workflow; Discrete event simulation; Factory (object-oriented programming); Production (economics); Work in process; Industrial engineering; Lead time; Work order; Manufacturing; Computer science; Manufacturing engineering; Engineering; Reliability engineering; Operations management; Simulation; Civil engineering; Mechanical engineering","score_opus":0.03782742012952542,"score_gpt":0.29143013190288475,"score_spread":0.25360271177335936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249847880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9642961,0.00033594642,0.034104146,0.0000151436625,0.0004284954,0.0005265939,0.000035699282,0.00006071173,0.00019718493],"genre_scores_gemma":[0.99507445,0.000021166183,0.0047730235,0.0000017701209,0.000029614677,0.000033233056,0.00003544347,0.000025184998,0.000006132736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983449,0.000066211665,0.00059126265,0.00023606671,0.0005714267,0.00019014649],"domain_scores_gemma":[0.9982527,0.00006720797,0.00030028858,0.00015069266,0.0011550185,0.000074078314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060550205,0.0002024618,0.0002443549,0.00037348946,0.00011046445,0.000061793944,0.000095043906,0.00010470436,0.000021311276],"category_scores_gemma":[0.00023010299,0.00018634024,0.00009219286,0.0011004177,0.00015876653,0.000669783,0.000022886656,0.00019911493,0.0000012790803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010635167,0.000039522703,0.03916473,0.00006729858,0.000113816895,9.308149e-8,0.001613554,0.86987895,0.0049253297,0.00035792153,0.00002936252,0.083703086],"study_design_scores_gemma":[0.0014933747,0.000055548662,0.058345947,0.00018116146,0.00022323894,0.0000046714276,0.002129042,0.9338492,0.0016794796,0.0018217067,0.000015236196,0.00020137192],"about_ca_topic_score_codex":0.00008014347,"about_ca_topic_score_gemma":0.000030968306,"teacher_disagreement_score":0.08350171,"about_ca_system_score_codex":0.0005832096,"about_ca_system_score_gemma":0.00018800925,"threshold_uncertainty_score":0.7598735},"labels":[],"label_agreement":null},{"id":"W4249851612","doi":"10.22215/etd/2013-07003","title":"Symbiotic office programming in urban high-rises : linked spaces as a means of inter-office communication","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"","keywords":"Computer science; Humanities; Art","score_opus":0.00773628873354366,"score_gpt":0.22521021934329744,"score_spread":0.21747393060975378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249851612","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9540707,0.0015240967,0.00068482076,0.00004884437,0.0012188422,0.0007812073,0.0000073556057,0.00046638763,0.041197777],"genre_scores_gemma":[0.99017423,0.00022670906,0.002367208,0.000008233713,0.000050194212,0.00011675898,0.00080385624,0.000052097334,0.0062007126],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9988142,0.00005556223,0.00057387486,0.00020272777,0.00016895194,0.00018468761],"domain_scores_gemma":[0.99907553,0.00009410867,0.00018563482,0.0003897385,0.00020870329,0.00004626332],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010020542,0.00027542253,0.0003544107,0.00034877786,0.000041115247,0.000094848554,0.0002787154,0.00039870077,0.00044762928],"category_scores_gemma":[0.00004468199,0.0002724547,0.00008540188,0.00034118415,0.000040925217,0.00023809275,0.000014443319,0.00046242907,0.00009321966],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005159753,0.0007366082,0.0031345226,0.006781371,0.0010842711,0.000006209403,0.025415156,0.0035891219,0.038149066,0.15371487,0.010325392,0.75654745],"study_design_scores_gemma":[0.010944542,0.002338756,0.13543355,0.032165658,0.0026819783,0.00009864297,0.25416797,0.085041255,0.30747387,0.0075619947,0.14917341,0.0129183745],"about_ca_topic_score_codex":0.0026081675,"about_ca_topic_score_gemma":0.0057286303,"teacher_disagreement_score":0.74362904,"about_ca_system_score_codex":0.00009848171,"about_ca_system_score_gemma":0.000051667605,"threshold_uncertainty_score":0.99997276},"labels":[],"label_agreement":null},{"id":"W4250016131","doi":"10.1109/wsc.2015.7408500","title":"Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction","year":2015,"lang":"en","type":"article","venue":"2015 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Ambiguity; Task (project management); Process (computing); Computer science; Control (management); Order (exchange); Work (physics); Cost estimate; Operations research; Industrial engineering; Reliability engineering; Engineering; Systems engineering; Business","score_opus":0.05482280833876064,"score_gpt":0.3000320759504613,"score_spread":0.24520926761170064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250016131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059632946,0.00012008507,0.9356057,0.000101682395,0.0020251838,0.0012150054,0.0001695845,0.000582339,0.0005474946],"genre_scores_gemma":[0.9814112,0.0000046522355,0.017195381,0.00010040096,0.00034308535,0.00012172916,0.0003699633,0.00006454311,0.00038903803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99800533,0.00012587314,0.0006650024,0.0004755056,0.00036585072,0.0003624636],"domain_scores_gemma":[0.99805987,0.00032536668,0.00019992098,0.00033447493,0.0008598703,0.00022049248],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029682217,0.0003898204,0.0003685197,0.00033723505,0.00014628476,0.00021913544,0.00016856803,0.0003399749,0.00019382627],"category_scores_gemma":[0.0003218313,0.00041827446,0.00017008395,0.0002509369,0.00013296209,0.0009413983,0.000022130056,0.00026532254,0.00020561913],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002178734,0.000047511934,0.001054482,0.000024939507,0.000057097815,9.576796e-7,0.00076784036,0.94373524,0.002031606,0.00013964376,0.00052246614,0.05140032],"study_design_scores_gemma":[0.0037531592,0.000105620624,0.0041391817,0.000075949145,0.00007128677,0.0000026779992,0.00040169596,0.9814958,0.0014723161,0.00013351791,0.007896062,0.00045272926],"about_ca_topic_score_codex":0.000025907886,"about_ca_topic_score_gemma":0.00015216957,"teacher_disagreement_score":0.92177826,"about_ca_system_score_codex":0.0003177688,"about_ca_system_score_gemma":0.0001910636,"threshold_uncertainty_score":0.9998269},"labels":[],"label_agreement":null},{"id":"W4250280947","doi":"10.33423/jabe.v22i12.3895","title":"Data Templates – Traceability and Digital Record Through Project Life-Cycle","year":2020,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Traceability; TRACE (psycholinguistics); Computer science; Product (mathematics); Supply chain; Product lifecycle; Database; Business; New product development; Software engineering; Marketing","score_opus":0.03216187071559049,"score_gpt":0.21205949723574136,"score_spread":0.17989762652015087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250280947","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99571705,0.00017969392,0.0018364291,0.00042724886,0.0001751677,0.000061444574,0.00005004535,0.000025535044,0.0015274044],"genre_scores_gemma":[0.9970646,0.0008244004,0.0017758751,0.00006816248,0.00024676215,9.335614e-7,0.000008535606,0.000009709597,0.0000010326785],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995514,0.0000013594956,0.00026689403,0.00009701552,0.00002129954,0.00006203717],"domain_scores_gemma":[0.9997436,0.000019296387,0.0000837115,0.000078541154,0.000027765247,0.00004708363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052419186,0.000077637036,0.00016948993,0.00001978245,0.00003092804,0.00013866344,0.00007833508,0.0000443622,0.000009044227],"category_scores_gemma":[0.000014127225,0.0000674385,0.0000129838145,0.000052486426,0.00003450272,0.00068246335,0.000031348172,0.00009699531,0.0000013052221],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072076963,0.000075546755,0.010643023,0.0006527272,0.0003954124,0.000005087151,0.00206956,0.015767315,0.00057856186,0.005397208,0.007105514,0.9565893],"study_design_scores_gemma":[0.0046268585,0.00023918558,0.038163617,0.00010555077,0.0002451566,0.0004654775,0.0071938694,0.49868178,0.0005263598,0.026543295,0.4218669,0.0013419406],"about_ca_topic_score_codex":0.0000038335706,"about_ca_topic_score_gemma":0.000006636674,"teacher_disagreement_score":0.95524734,"about_ca_system_score_codex":0.000010347575,"about_ca_system_score_gemma":0.000030434105,"threshold_uncertainty_score":0.27500623},"labels":[],"label_agreement":null},{"id":"W4250367747","doi":"10.32920/ryerson.14660328.v1","title":"Multidisciplinary design optimization of stamped and welded structures","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Multidisciplinary design optimization; Finite element method; Constraint (computer-aided design); Welding; Multidisciplinary approach; Computer science; Engineering design process; Engineering; Mechanical engineering; Structural engineering","score_opus":0.01676259080856053,"score_gpt":0.2278894630191357,"score_spread":0.2111268722105752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250367747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022839455,0.00047588348,0.9691609,0.000010402843,0.00037493836,0.00016477928,0.000005342201,0.00017104848,0.0067972573],"genre_scores_gemma":[0.75199634,0.00022239222,0.24741913,0.000001726368,0.000027809994,0.000013590389,0.00003706297,0.000027439602,0.00025447225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954826,0.000022661445,0.00017148399,0.00013469585,0.00006618698,0.00005671855],"domain_scores_gemma":[0.99972975,0.000016517406,0.000039312974,0.00013872856,0.00005035709,0.000025313317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000031851592,0.00011923224,0.00015128274,0.00007800707,0.000015782347,0.000031535616,0.00004280978,0.00018033515,0.00053101557],"category_scores_gemma":[0.000007653571,0.00011204945,0.000029350995,0.000046652527,0.000027605445,0.00003947988,0.000065192646,0.0001322729,4.220109e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039165907,0.000003236868,0.00008435048,0.00012460041,0.000041748608,5.9198004e-7,0.0001912956,0.9912133,0.0012768492,0.0007893271,0.00010438203,0.006166389],"study_design_scores_gemma":[0.00015771748,0.000010146178,0.0008809403,0.00006897868,0.0000294984,0.000006716004,0.0004915771,0.9740647,0.02294787,0.0011567606,0.0000120328705,0.00017303674],"about_ca_topic_score_codex":0.000015663934,"about_ca_topic_score_gemma":0.000010570362,"teacher_disagreement_score":0.7291569,"about_ca_system_score_codex":0.000014270689,"about_ca_system_score_gemma":0.000023885716,"threshold_uncertainty_score":0.5814248},"labels":[],"label_agreement":null},{"id":"W4250956078","doi":"10.1139/cjce-28-3-383","title":"Performance measurement indices for simulated construction operations","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering; Reliability engineering; Civil engineering","score_opus":0.01261772601370272,"score_gpt":0.18037044343119316,"score_spread":0.16775271741749043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250956078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7419539,0.0013509196,0.24989638,0.00011728514,0.0036824136,0.00020326453,0.000011842353,0.00009146813,0.0026925206],"genre_scores_gemma":[0.99874437,0.00005547278,0.00093587564,0.000009283956,0.0002209178,0.0000035839946,0.0000021095368,0.000016702821,0.000011680429],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994186,0.0000034810275,0.00025749454,0.000045707522,0.000106418265,0.00016830032],"domain_scores_gemma":[0.9994552,0.000009835109,0.000027480002,0.000055984514,0.00026178212,0.00018972826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014322276,0.000090414025,0.00010792651,0.00032186555,0.00007945269,0.000051471707,0.000071887545,0.000057523852,0.000095833115],"category_scores_gemma":[0.000044412234,0.00009406474,0.000050994033,0.00016751024,0.000015595719,0.00027902634,8.9556664e-7,0.0001294902,0.000002241167],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023355256,9.771143e-7,0.0013714357,0.00002422477,0.00004141366,0.0000024738317,0.000096881515,0.9899836,0.0014039773,0.00033463366,0.00023331965,0.0065047382],"study_design_scores_gemma":[0.0005233374,0.00007062839,0.003119128,0.00019063227,0.000042673255,0.000458849,0.00012198721,0.94525105,0.0018750096,0.000042177286,0.04808336,0.00022115855],"about_ca_topic_score_codex":0.00007099677,"about_ca_topic_score_gemma":0.023048813,"teacher_disagreement_score":0.25679046,"about_ca_system_score_codex":0.00021845548,"about_ca_system_score_gemma":0.00018828499,"threshold_uncertainty_score":0.994778},"labels":[],"label_agreement":null},{"id":"W4251186688","doi":"10.32920/ryerson.14660328","title":"Multidisciplinary design optimization of stamped and welded structures","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Multidisciplinary design optimization; Finite element method; Welding; Constraint (computer-aided design); Multidisciplinary approach; Engineering design process; Computer science; Engineering; Mechanical engineering; Structural engineering","score_opus":0.01676259080856053,"score_gpt":0.2278894630191357,"score_spread":0.2111268722105752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251186688","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022839455,0.00047588348,0.9691609,0.000010402843,0.00037493836,0.00016477928,0.000005342201,0.00017104848,0.0067972573],"genre_scores_gemma":[0.75199634,0.00022239222,0.24741913,0.000001726368,0.000027809994,0.000013590389,0.00003706297,0.000027439602,0.00025447225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954826,0.000022661445,0.00017148399,0.00013469585,0.00006618698,0.00005671855],"domain_scores_gemma":[0.99972975,0.000016517406,0.000039312974,0.00013872856,0.00005035709,0.000025313317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000031851592,0.00011923224,0.00015128274,0.00007800707,0.000015782347,0.000031535616,0.00004280978,0.00018033515,0.00053101557],"category_scores_gemma":[0.000007653571,0.00011204945,0.000029350995,0.000046652527,0.000027605445,0.00003947988,0.000065192646,0.0001322729,4.220109e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000039165907,0.000003236868,0.00008435048,0.00012460041,0.000041748608,5.9198004e-7,0.0001912956,0.9912133,0.0012768492,0.0007893271,0.00010438203,0.006166389],"study_design_scores_gemma":[0.00015771748,0.000010146178,0.0008809403,0.00006897868,0.0000294984,0.000006716004,0.0004915771,0.9740647,0.02294787,0.0011567606,0.0000120328705,0.00017303674],"about_ca_topic_score_codex":0.000015663934,"about_ca_topic_score_gemma":0.000010570362,"teacher_disagreement_score":0.7291569,"about_ca_system_score_codex":0.000014270689,"about_ca_system_score_gemma":0.000023885716,"threshold_uncertainty_score":0.5814248},"labels":[],"label_agreement":null},{"id":"W4251639711","doi":"10.4018/978-1-5225-7314-2.ch022","title":"Minimizing Construction Emissions Using Building Information Modeling and Decision-Making Techniques","year":2018,"lang":"en","type":"book-chapter","venue":"IGI Global eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Building information modeling; Greenhouse gas; Multiple-criteria decision analysis; Life-cycle assessment; Order (exchange); Engineering; Computer science; Operations research; Environmental economics; Operations management; Production (economics); Business; Machine learning","score_opus":0.013605493774414721,"score_gpt":0.24830278339588005,"score_spread":0.23469728962146533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251639711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076247887,0.00020938914,0.5089584,0.000002295737,0.0008398227,0.00022536692,0.000045204728,0.0006046952,0.48149005],"genre_scores_gemma":[0.5522261,0.00004951647,0.44660425,0.00007748588,0.00069876,0.000016444743,0.000008124237,0.00008249712,0.00023678868],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99876916,0.000005253603,0.0005622109,0.00021633363,0.00023784315,0.00020922025],"domain_scores_gemma":[0.99933743,0.000027025175,0.0001521782,0.00020951315,0.00018663886,0.000087196626],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009019512,0.00035026282,0.00028600876,0.00022748619,0.0002335449,0.00020510645,0.000102706785,0.0005340979,0.000042347263],"category_scores_gemma":[0.000023713314,0.00037313477,0.000094004645,0.000030758107,0.00009518067,0.00038273362,0.000064652995,0.0002878079,0.000010173448],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001753301,6.4788895e-7,0.0000055452756,0.00006712505,0.000055136,0.0000019273118,0.000109494984,0.0018682205,0.00031607045,0.5109983,0.00013913197,0.48642087],"study_design_scores_gemma":[0.00013742014,0.000021720949,6.418863e-7,0.0025341143,0.00010743795,0.0004805016,0.00015552242,0.33914542,0.00038007178,0.65252674,0.003933284,0.0005771149],"about_ca_topic_score_codex":0.000009601241,"about_ca_topic_score_gemma":0.0000080172995,"teacher_disagreement_score":0.5446013,"about_ca_system_score_codex":0.00035289803,"about_ca_system_score_gemma":0.00006886257,"threshold_uncertainty_score":0.9998721},"labels":[],"label_agreement":null},{"id":"W4251944493","doi":"10.32920/ryerson.14645691","title":"Development of simulation model for evaluating operational performance of railroad networks","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Visual Basic for Applications; Computer science; Scheduling (production processes); Software; State (computer science); Blocking (statistics); Operations research; Engineering; Computer network; Operations management; Operating system","score_opus":0.05199394372312149,"score_gpt":0.29461880489115294,"score_spread":0.24262486116803145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251944493","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38484,0.00006929808,0.614337,0.0000018486926,0.00021348083,0.00015768704,0.0000036839613,0.000024721652,0.0003522323],"genre_scores_gemma":[0.7483515,0.0000107621,0.2512785,0.000003558198,0.00003171219,0.000066960056,0.0001780906,0.000010146043,0.00006873706],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991418,0.000007169875,0.0004999623,0.0001226128,0.00015559082,0.00007283756],"domain_scores_gemma":[0.9993513,0.000031377487,0.000090003334,0.00011214414,0.00040051396,0.000014649392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018486369,0.00011138166,0.00017851518,0.0000549131,0.00003473766,0.00001610977,0.00006111143,0.00015582464,0.00005984208],"category_scores_gemma":[0.000015114439,0.00011325343,0.00005901233,0.00004660856,0.000011334332,0.000077008415,0.000037981612,0.00011778244,2.9817e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007890982,0.000005642359,0.00006062059,0.0002496122,0.00004115069,3.695175e-9,0.00039708617,0.9506561,0.0013237782,0.00030560544,0.000008270211,0.04694423],"study_design_scores_gemma":[0.00013651473,0.0000065175436,0.00019523913,0.00013770752,0.0000161129,2.0222008e-7,0.000059803882,0.9918726,0.0074192355,0.00003823102,0.000011907058,0.0001059395],"about_ca_topic_score_codex":0.0000012668415,"about_ca_topic_score_gemma":0.0000119970855,"teacher_disagreement_score":0.3635115,"about_ca_system_score_codex":0.00005375579,"about_ca_system_score_gemma":0.00020612116,"threshold_uncertainty_score":0.46183407},"labels":[],"label_agreement":null},{"id":"W4252198646","doi":"10.1109/wsc.2013.6721693","title":"Effective simulation of earth moving projects","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Context (archaeology); Process (computing); Task (project management); Resource (disambiguation); Earth observation; Systems engineering; Software engineering; Industrial engineering; Simulation; Engineering; Programming language; Aerospace engineering; Geology","score_opus":0.015410176669347362,"score_gpt":0.2325798939728802,"score_spread":0.21716971730353285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252198646","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75106025,0.00003916851,0.23974532,0.000058805104,0.00045688116,0.0007906898,0.000014716586,0.00026105024,0.0075730938],"genre_scores_gemma":[0.9987848,0.0000030761319,0.0007491755,0.000024378864,0.000074980795,0.000071217546,0.00002040069,0.00002074773,0.00025123634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991645,0.00003333117,0.00031603372,0.00017096975,0.00014276085,0.00017239367],"domain_scores_gemma":[0.99912363,0.00012787252,0.00007048945,0.00023171067,0.0003969215,0.000049369435],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000044412267,0.00016436038,0.00017751094,0.00019828267,0.00006036107,0.00007822709,0.00010623554,0.0001067156,0.0011337546],"category_scores_gemma":[0.000035962614,0.00015691061,0.00006434464,0.00020891799,0.000060082624,0.0006702711,0.00002151256,0.00014818736,0.00022035047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006336008,0.000025420115,0.0055693737,0.000052505282,0.00005980022,2.0068592e-7,0.0010332743,0.92302907,0.010065208,0.0020627568,0.00026884695,0.057827223],"study_design_scores_gemma":[0.000249454,0.000038429174,0.026397094,0.00006812735,0.000015134624,0.0000012040427,0.00014650275,0.9663072,0.004764861,0.00096279004,0.0008849165,0.00016424066],"about_ca_topic_score_codex":0.000088073444,"about_ca_topic_score_gemma":0.000120545075,"teacher_disagreement_score":0.24772452,"about_ca_system_score_codex":0.000025819356,"about_ca_system_score_gemma":0.000025539393,"threshold_uncertainty_score":0.99977934},"labels":[],"label_agreement":null},{"id":"W4252234187","doi":"10.1007/978-1-4939-7131-2_101426","title":"Virtual Settlement","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Settlement (finance); Geography; Computer science; World Wide Web","score_opus":0.009552013253074395,"score_gpt":0.1904195967189135,"score_spread":0.18086758346583912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252234187","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010076644,0.00006270424,0.0074589574,0.000015583282,0.0010994618,0.00004632606,0.000022984623,0.00027294204,0.99101096],"genre_scores_gemma":[0.0010665844,0.00005279028,0.00030264896,0.00005190855,0.00048978697,0.000003752047,0.000051492472,0.00002992222,0.9979511],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996732,6.2725684e-7,0.000111512825,0.0000773336,0.000079481324,0.000057862744],"domain_scores_gemma":[0.999834,0.0000034258414,0.000011695129,0.000108695735,0.000017781933,0.000024375775],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000015127402,0.0001133054,0.000076164106,0.0000468446,0.000014933823,0.000014453189,0.000041009327,0.00013988208,0.02717041],"category_scores_gemma":[4.357799e-7,0.0001022972,0.000041548188,0.000004367119,0.000024954754,0.00002502755,0.0000070021406,0.00009650417,0.002600484],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.3972844e-7,4.984982e-7,4.484217e-7,0.0000053834106,0.000049021623,6.0588786e-7,0.000026484719,0.0000131386005,0.000022640654,0.6686827,0.25149918,0.07969904],"study_design_scores_gemma":[0.000037447448,0.00001978508,8.267004e-7,0.000018493613,0.0000106335765,0.0000044324584,0.000010343656,0.0004005158,0.00023337519,0.0076776864,0.9914588,0.0001277087],"about_ca_topic_score_codex":5.1365106e-7,"about_ca_topic_score_gemma":0.0000141092705,"teacher_disagreement_score":0.73995954,"about_ca_system_score_codex":0.000037660688,"about_ca_system_score_gemma":0.0000071283644,"threshold_uncertainty_score":0.9981761},"labels":[],"label_agreement":null},{"id":"W4252575285","doi":"10.5703/1288284315875","title":"4D Modeling","year":2007,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Purdue Pharma (Canada)","funders":"","keywords":"Computer science; Schedule; Product (mathematics); Systems engineering; Software engineering; Engineering","score_opus":0.035770920634222395,"score_gpt":0.2603751006347322,"score_spread":0.2246041800005098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252575285","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017221183,0.0005612112,0.3784406,0.0000021737217,0.0019728683,0.000026097816,0.0000019049269,0.00034100164,0.61848193],"genre_scores_gemma":[0.7929718,0.007556886,0.025324915,0.00011118015,0.00800731,0.000060587805,0.0002757207,0.00036179586,0.16532981],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941605,0.0000013141233,0.00018694783,0.000080930455,0.00021732038,0.000097415446],"domain_scores_gemma":[0.99972194,0.0000039938145,0.0000122361,0.00010961174,0.00012460699,0.00002760241],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000101829835,0.000106245,0.00010883221,0.00010665868,0.00002154253,0.000029364885,0.000040033538,0.00025525995,0.0010098823],"category_scores_gemma":[0.000006632021,0.00009655641,0.00005721517,0.000055628992,0.000007243073,0.000033977984,0.0000042507677,0.000225834,0.00008854756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017321461,0.0000055812357,0.00005640026,0.00031862076,0.00015601552,0.00000958086,0.000039209328,0.17753549,0.00009676391,0.008868365,0.14934751,0.66356474],"study_design_scores_gemma":[0.000029491051,0.0000024644755,0.0000026597884,0.000046309222,0.000018055089,0.00006894609,0.00003108159,0.58743197,0.0002491086,0.00021366721,0.41170815,0.00019814145],"about_ca_topic_score_codex":0.000076758326,"about_ca_topic_score_gemma":0.000059014077,"teacher_disagreement_score":0.7927996,"about_ca_system_score_codex":0.00012421726,"about_ca_system_score_gemma":0.00009728686,"threshold_uncertainty_score":0.9999033},"labels":[],"label_agreement":null},{"id":"W4252933484","doi":"10.1109/wsc.2014.7020162","title":"Simulation-based multiobjective optimization of bridge construction processes using parallel computing","year":2014,"lang":"en","type":"article","venue":"Proceedings of the Winter Simulation Conference 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Sorting; Bridge (graph theory); Convergence (economics); Multi-objective optimization; Genetic algorithm; Discrete event simulation; Computation; Mathematical optimization; sort; Distributed computing; Pareto principle; Range (aeronautics); Resource (disambiguation); Algorithm; Simulation; Engineering; Mathematics; Machine learning","score_opus":0.020692885636552104,"score_gpt":0.24846018029559627,"score_spread":0.22776729465904416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252933484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21089971,0.000009724429,0.78783756,0.000019761026,0.00027370846,0.00022886758,0.000005771626,0.00009477186,0.0006301289],"genre_scores_gemma":[0.9815049,0.0000014013029,0.018362114,0.000014784236,0.00008051142,0.0000042171077,0.000005514302,0.00002026665,0.0000062675863],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895716,0.000016222673,0.00048727644,0.00018207966,0.0002261362,0.00013112539],"domain_scores_gemma":[0.9976927,0.00025342364,0.00039636635,0.000097343625,0.0015288725,0.00003127947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016020559,0.00016953191,0.00022294415,0.00014782933,0.000096513424,0.000051661336,0.0001682899,0.00010640374,0.000040788404],"category_scores_gemma":[0.0004070076,0.00014764268,0.000075079784,0.00029367613,0.00014273281,0.00038436725,0.000024166564,0.00011897194,0.000001586472],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025967049,0.00001290622,0.009771563,0.00021528376,0.000020720103,3.6031622e-9,0.00033329896,0.9844088,0.001671843,0.0007830394,0.0000051820375,0.002751394],"study_design_scores_gemma":[0.00042210065,0.000026133923,0.00228071,0.00025088,0.00003653819,7.700439e-7,0.00012157429,0.98412955,0.012093812,0.00047199582,0.00002295561,0.00014298815],"about_ca_topic_score_codex":0.000013071612,"about_ca_topic_score_gemma":0.0000029330276,"teacher_disagreement_score":0.7706052,"about_ca_system_score_codex":0.000052843276,"about_ca_system_score_gemma":0.0000482977,"threshold_uncertainty_score":0.6020694},"labels":[],"label_agreement":null},{"id":"W4254056783","doi":"10.22260/isarc2012/0020","title":"RFID Indoor Location Identification for Construction Projects","year":2012,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Trilateration; Radio-frequency identification; Identification (biology); Computer science; Location tracking; Process (computing); Global Positioning System; Real-time locating system; Location awareness; Real-time computing; Location-based service; Telecommunications; Engineering; Computer security","score_opus":0.013727294355425667,"score_gpt":0.21460130086896942,"score_spread":0.20087400651354376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254056783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9833911,0.00019045804,0.008046186,0.00017489295,0.0019696802,0.00075626926,0.000008809491,0.00018935338,0.0052732397],"genre_scores_gemma":[0.9972984,0.000008272877,0.002172291,0.000011236559,0.00023586606,0.00012504919,0.0000034280258,0.000014968067,0.00013047],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994461,0.0000020338841,0.00021597941,0.00008008374,0.00011993416,0.00013590035],"domain_scores_gemma":[0.99949163,0.0000123446225,0.00011144067,0.00006151977,0.00029714894,0.00002590646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017376636,0.00008188602,0.00007872923,0.00006982655,0.000077584205,0.000029342524,0.00011039178,0.00006946619,0.00000801293],"category_scores_gemma":[0.00007292493,0.00006601229,0.000039879713,0.0002542776,0.00006166234,0.0004722586,0.000011641917,0.00007084934,0.00000677645],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003560907,0.000045110122,0.039195336,0.00077071274,0.000060252016,2.5057911e-9,0.002040708,0.00007526032,0.6972645,0.17454432,0.0056331106,0.08033511],"study_design_scores_gemma":[0.0002754535,0.00001944537,0.018325254,0.00006422548,0.000052533713,0.000021518015,0.0015238223,0.0026704161,0.96878445,0.003722399,0.004388145,0.00015235161],"about_ca_topic_score_codex":0.000003202943,"about_ca_topic_score_gemma":7.3170645e-7,"teacher_disagreement_score":0.27151996,"about_ca_system_score_codex":0.000057046236,"about_ca_system_score_gemma":0.000011720135,"threshold_uncertainty_score":0.2691903},"labels":[],"label_agreement":null},{"id":"W4254114611","doi":"10.1115/detc2006-99412","title":"Review of Metamodeling Techniques in Support of Engineering Design Optimization","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Metamodeling; Scope (computer science); Computer science; Computation; Engineering design process; Process (computing); Systems engineering; Industrial engineering; Management science; Software engineering; Engineering; Algorithm","score_opus":0.010583060926884963,"score_gpt":0.20605810549389633,"score_spread":0.19547504456701137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254114611","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015182898,0.0024311866,0.99365836,0.000010085589,0.000030479016,0.0001005446,8.618174e-7,0.00009719134,0.00351947],"genre_scores_gemma":[0.29679587,0.0062018726,0.6968379,0.000037315473,0.000023617513,0.000034843564,0.00001595693,0.000019837104,0.00003279555],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995731,0.00000595209,0.00028837568,0.000039862512,0.000046839166,0.00004587999],"domain_scores_gemma":[0.9998542,0.0000099747085,0.000025301006,0.00005801941,0.000046810987,0.000005710614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013156513,0.000048731916,0.00011829244,0.00009739464,0.0000022928793,0.0000016935194,0.000029032954,0.000031350504,0.00008649465],"category_scores_gemma":[0.000008387932,0.000046442365,0.000024602148,0.00016071094,0.0000047727985,0.00007943907,0.000002482384,0.00003308461,3.415583e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.8475393e-7,0.000004220855,0.000023433893,0.00084169616,0.0000033168947,7.909641e-8,0.0000038130438,0.9861601,0.007627868,0.0018739494,0.0005575883,0.0029033297],"study_design_scores_gemma":[0.000043427775,0.000010247835,0.000010778212,0.0007303585,0.0000103329085,0.0000027844112,0.000003317296,0.7357078,0.26275113,0.000075150165,0.00058795686,0.00006670521],"about_ca_topic_score_codex":0.00002309306,"about_ca_topic_score_gemma":0.0000019154008,"teacher_disagreement_score":0.29682046,"about_ca_system_score_codex":0.000014532921,"about_ca_system_score_gemma":0.0000070601527,"threshold_uncertainty_score":0.18938647},"labels":[],"label_agreement":null},{"id":"W4255096029","doi":"10.11159/iccste21","title":"Proceedings of the 6th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'21)","year":2021,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Lakehead University; Toronto Metropolitan University; University of British Columbia; University of Toronto","funders":"University of British Columbia","keywords":"Engineering; Civil engineering; Construction engineering","score_opus":0.01362511255324676,"score_gpt":0.21677144235946777,"score_spread":0.20314632980622102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255096029","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.981858,0.00025831937,0.0001782532,0.00065749895,0.0056872806,0.00068686635,0.0010470441,0.00012859494,0.009498131],"genre_scores_gemma":[0.99751145,0.0005573327,0.0002831542,0.000031718228,0.00028846684,0.000079815654,0.00022720061,0.000068417954,0.0009524694],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973607,0.0000038472667,0.00090850925,0.0005465728,0.0008793084,0.00030104374],"domain_scores_gemma":[0.9982979,0.00004177537,0.00048599343,0.00011869303,0.0009507853,0.000104799714],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000102304606,0.00064162334,0.0005534376,0.00031784884,0.000117631855,0.00023228055,0.0006986921,0.00034611285,0.0004906609],"category_scores_gemma":[0.000038851125,0.0004943051,0.00023311687,0.0003228409,0.00014361352,0.0005530329,0.00002756267,0.00086880435,0.00000255914],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039336595,0.00005515118,0.008384166,0.0046986816,0.0018741288,0.0000034242937,0.005180779,0.06529898,0.33548293,0.5697954,0.0028868292,0.005946131],"study_design_scores_gemma":[0.004581568,0.00043857697,0.23969957,0.014543566,0.00086803857,0.00017873128,0.0039813947,0.47787035,0.23992275,0.0058787395,0.008029509,0.0040072156],"about_ca_topic_score_codex":0.000045984703,"about_ca_topic_score_gemma":0.00010264283,"teacher_disagreement_score":0.5639167,"about_ca_system_score_codex":0.00012350133,"about_ca_system_score_gemma":0.000067590554,"threshold_uncertainty_score":0.99975085},"labels":[],"label_agreement":null},{"id":"W4255467053","doi":"10.1139/cjce-28-2-314","title":"Étude comparative de modèles phénoménologiques décrivant le comportement au jeune âge du béton. Partie 1.","year":2001,"lang":"fr","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ton; Humanities; Art; Geography; Archaeology","score_opus":0.01990227485254114,"score_gpt":0.21285418236511858,"score_spread":0.19295190751257743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255467053","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5413066,0.028131936,0.41263768,0.0039579803,0.0057491683,0.00020718754,0.000042409956,0.000099827645,0.007867186],"genre_scores_gemma":[0.99520636,0.0008002889,0.0028142931,0.000048890084,0.00094215345,0.000007711221,0.000005284138,0.0000421312,0.00013288384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981963,0.000054087533,0.0007272749,0.00014561463,0.00016934365,0.0007073801],"domain_scores_gemma":[0.998555,0.000063070955,0.00013652153,0.00016361855,0.00023002402,0.0008517578],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00037669664,0.0003162617,0.0004672905,0.0004210097,0.00014573302,0.00011244175,0.00025435633,0.00020269936,0.00039185956],"category_scores_gemma":[0.000055482593,0.00035714472,0.00018261604,0.00025320228,0.00011008214,0.0004547469,0.000011322848,0.0006374346,0.000016518803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001251365,0.0000336708,0.0131276315,0.000112115464,0.0003922771,0.0005383126,0.0032687169,0.94536525,0.0026627872,0.02605463,0.005343754,0.0030883288],"study_design_scores_gemma":[0.0016969921,0.00041639185,0.052280106,0.0018289585,0.0002734797,0.0054594474,0.0039771926,0.63907236,0.011545825,0.0015501942,0.28064385,0.0012551984],"about_ca_topic_score_codex":0.012188264,"about_ca_topic_score_gemma":0.38524392,"teacher_disagreement_score":0.45389974,"about_ca_system_score_codex":0.0013908802,"about_ca_system_score_gemma":0.0013104995,"threshold_uncertainty_score":0.99988806},"labels":[],"label_agreement":null},{"id":"W4255964485","doi":"10.2307/j.ctv15wxr5j.24","title":"Implementing Collection Life Cycle Management","year":2016,"lang":"en","type":"book-chapter","venue":"Purdue University Press eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Purdue Pharma (Canada); University of Waterloo","funders":"","keywords":"Computer science","score_opus":0.009497029659596824,"score_gpt":0.16805593728228735,"score_spread":0.15855890762269054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255964485","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000283738,0.000055525084,0.0062296246,0.000009938902,0.00046930966,0.00024285,0.0000471332,0.00036776226,0.9925495],"genre_scores_gemma":[0.0040448536,0.00018801776,0.00022455433,0.000011439274,0.00013799254,0.0000019740796,0.000012299685,0.000037055423,0.99534184],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930507,0.000007670702,0.0001372235,0.00019907339,0.00013984903,0.00021109564],"domain_scores_gemma":[0.9996053,0.000011452643,0.00006464306,0.00019087139,0.00004877828,0.00007898205],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004484219,0.00019518142,0.00015047083,0.00018837105,0.00017621678,0.0000312523,0.0001367384,0.00017231464,0.00019030178],"category_scores_gemma":[8.5836746e-7,0.00021656493,0.000097917495,0.00000682735,0.000039627113,0.00007719718,0.000094802366,0.00015999294,0.000029293302],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015193121,0.0000014793428,0.0000016045653,0.00008598913,0.0002651323,0.000015717931,0.000063008345,0.000046807876,0.00002360765,0.92385143,0.005412309,0.07021769],"study_design_scores_gemma":[0.00032671448,0.000008514889,0.000006585544,0.00009962256,0.0001149691,0.000004335387,0.000046138794,0.0004404264,0.00012905283,0.0012850007,0.99729395,0.00024470311],"about_ca_topic_score_codex":0.000016016385,"about_ca_topic_score_gemma":0.000027387965,"teacher_disagreement_score":0.9918816,"about_ca_system_score_codex":0.00020506947,"about_ca_system_score_gemma":0.000015599773,"threshold_uncertainty_score":0.8831262},"labels":[],"label_agreement":null},{"id":"W4256255337","doi":"10.32920/ryerson.14656428.v1","title":"The development of a geo-referencing system for machine controlled construction equipment","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Excavator; Real-time computing; Kinematics; Systems engineering; Engineering; Mechanical engineering","score_opus":0.01454661700909382,"score_gpt":0.2191094785004344,"score_spread":0.2045628614913406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256255337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10678706,0.0014696942,0.87379235,0.000042344505,0.0053231027,0.0014609066,0.000026243082,0.0003591385,0.010739153],"genre_scores_gemma":[0.9584467,0.000040102652,0.04044557,0.000002725148,0.00007984966,0.00072616787,0.00008391167,0.00002139591,0.00015357223],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986467,0.000030006415,0.0007974575,0.00018631981,0.00017842841,0.00016110405],"domain_scores_gemma":[0.99918246,0.00011232642,0.00017688432,0.00023454962,0.00025878087,0.000035022174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031824433,0.0002129971,0.0004339388,0.000071575465,0.0001499244,0.00009781227,0.0001283674,0.00018879227,0.000032214743],"category_scores_gemma":[0.000023559383,0.00014582516,0.00016773425,0.000051556133,0.000030653075,0.00003068487,0.00007436293,0.00021610981,0.0000016558066],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054093776,0.00004890256,0.00024947,0.006369463,0.004090956,0.0000016686248,0.00294599,0.037821256,0.020442419,0.12382077,0.0003844019,0.80328375],"study_design_scores_gemma":[0.009245423,0.000058861395,0.00036129032,0.0024117245,0.0005475255,0.00010001803,0.02430879,0.74015397,0.21331142,0.0013323082,0.006866577,0.0013020865],"about_ca_topic_score_codex":0.000021263852,"about_ca_topic_score_gemma":0.00035347702,"teacher_disagreement_score":0.85165966,"about_ca_system_score_codex":0.00028672355,"about_ca_system_score_gemma":0.00026776735,"threshold_uncertainty_score":0.5946577},"labels":[],"label_agreement":null},{"id":"W4256474920","doi":"10.1109/wsc.1995.478895","title":"Automating the process of building simulation models","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference Proceedings, 1995.","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Process (computing); Implementation; Simulation modeling; Aggregate (composite); Modeling and simulation; Systems engineering; Data modeling; Simulation; Software engineering; Engineering; Programming language","score_opus":0.022377822523094944,"score_gpt":0.26999306509403626,"score_spread":0.2476152425709413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256474920","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54337806,0.000057179575,0.44999415,0.00014667308,0.00018137808,0.00026141107,0.000004055335,0.00040205274,0.0055750487],"genre_scores_gemma":[0.99773175,0.0000042494653,0.0018946204,0.000040984687,0.00022324926,0.000028587197,0.00000493409,0.000025818203,0.00004583572],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883443,0.000007791245,0.0004967057,0.00019476819,0.00027228723,0.00019401046],"domain_scores_gemma":[0.9990906,0.00007953968,0.00016056492,0.000104197046,0.000521719,0.000043341715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017340783,0.00018640005,0.00017337223,0.00013443451,0.00011730953,0.00012558704,0.00020065263,0.00010772197,0.00011250902],"category_scores_gemma":[0.000054023076,0.00015250637,0.00006359838,0.0002616524,0.000059433987,0.0011377645,0.000021459475,0.0001954678,0.000009021542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000089765745,0.00000896012,0.00074385956,0.00007097716,0.000019783181,2.8536116e-8,0.003083127,0.94212574,0.0017385687,0.0097827595,0.000019229832,0.04239801],"study_design_scores_gemma":[0.00020068832,0.0000160521,0.00040083536,0.00013223589,0.000019668738,0.0000022798026,0.0006344183,0.988243,0.0052823788,0.004603458,0.00030093087,0.00016405484],"about_ca_topic_score_codex":0.00000293533,"about_ca_topic_score_gemma":0.000003942924,"teacher_disagreement_score":0.45435366,"about_ca_system_score_codex":0.00006487679,"about_ca_system_score_gemma":0.000024451549,"threshold_uncertainty_score":0.62190294},"labels":[],"label_agreement":null},{"id":"W4256564067","doi":"10.22360/simaud.2017.simaud.016","title":"Visualization of Building Performance using Sankey Diagrams to Enhance the Decision-Making Process","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Visualization; Workflow; Computer science; Process (computing); Systems engineering; Relation (database); Upstream (networking); Efficient energy use; Architectural engineering; Engineering; Database","score_opus":0.012359194471432513,"score_gpt":0.3212843790567649,"score_spread":0.30892518458533236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256564067","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5910244,0.00001847528,0.40733916,0.000007644496,0.00023366674,0.00006187186,3.1175526e-7,0.00003610285,0.0012784101],"genre_scores_gemma":[0.99442434,0.000013192661,0.005448235,0.000017560193,0.000065614884,0.000008196809,2.471868e-7,0.000010263397,0.000012350283],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995347,0.000004438834,0.00016076774,0.000083627216,0.00012395646,0.00009246644],"domain_scores_gemma":[0.9995847,0.0000296221,0.000059457114,0.00022011636,0.00008865599,0.00001745043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009877477,0.0000682464,0.00007200019,0.00004251338,0.0002560916,0.000087565095,0.00018386907,0.000033992714,0.000037554102],"category_scores_gemma":[0.00008450733,0.000048653652,0.000019865989,0.00009373609,0.000027202212,0.00030463806,0.000020374797,0.000045795503,0.0000035975554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015348722,0.00000834782,0.019028086,0.00008987078,0.000018536583,2.0959764e-7,0.0007976066,0.17888866,0.026237871,0.00545112,0.00006922298,0.7693951],"study_design_scores_gemma":[0.000048629237,0.000015599473,0.00967698,0.0003784228,0.00000984008,0.000005895129,0.00017898371,0.8059434,0.18273336,0.0006836855,0.00018821596,0.0001369325],"about_ca_topic_score_codex":0.000009573772,"about_ca_topic_score_gemma":0.00003383788,"teacher_disagreement_score":0.7692582,"about_ca_system_score_codex":0.000023491872,"about_ca_system_score_gemma":0.000010475183,"threshold_uncertainty_score":0.19840384},"labels":[],"label_agreement":null},{"id":"W4256723869","doi":"10.1109/wsc.2013.6721669","title":"Utilizing simulation derived quantitative formulas for accurate excavator hauler fleet selection","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Excavator; Earthworks; Granularity; Computer science; Selection (genetic algorithm); Discrete event simulation; Field (mathematics); Production (economics); Duration (music); Industrial engineering; Operations research; Simulation; Engineering; Civil engineering; Mathematics; Artificial intelligence","score_opus":0.051695394389955115,"score_gpt":0.292097995106046,"score_spread":0.24040260071609088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256723869","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36230198,0.000035678473,0.6343758,0.00014946396,0.000597043,0.00081418175,0.00003466253,0.00038677122,0.001304396],"genre_scores_gemma":[0.99269265,0.000007828399,0.00639907,0.000087727145,0.00012913717,0.00024875966,0.00011585627,0.000047876194,0.00027111312],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867445,0.000034135046,0.00049341965,0.000304845,0.00015808301,0.00033504114],"domain_scores_gemma":[0.9985238,0.00022914377,0.00011383206,0.0002142406,0.0008270915,0.00009194816],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000072419934,0.00028429794,0.0002373823,0.00024500157,0.00023924164,0.00028245716,0.00014339885,0.00018410312,0.0012420899],"category_scores_gemma":[0.000075573116,0.00028321863,0.000112667796,0.00026127926,0.000058048376,0.0015480182,0.000020254849,0.00018566402,0.0002979999],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003461052,0.00003256886,0.0009133428,0.00005427675,0.00012592363,1.6971285e-7,0.001054521,0.93886364,0.021244587,0.011777858,0.0022714227,0.023627095],"study_design_scores_gemma":[0.00053253566,0.00006900746,0.003899569,0.000053037904,0.000032373788,0.0000022763522,0.00039647872,0.98133683,0.0043143267,0.0035294993,0.0055105677,0.00032349437],"about_ca_topic_score_codex":0.00006055516,"about_ca_topic_score_gemma":0.00029476552,"teacher_disagreement_score":0.63039064,"about_ca_system_score_codex":0.000111282796,"about_ca_system_score_gemma":0.00004729323,"threshold_uncertainty_score":0.999962},"labels":[],"label_agreement":null},{"id":"W4280519010","doi":"10.1007/978-981-19-0507-0_30","title":"Applications of Flow-Drilled Connections in Modular Construction","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Modular design; Engineering; Structural engineering; Drilling; Tension (geology); Shear (geology); Flow (mathematics); Modular construction; Tapping; Mechanical engineering; Engineering drawing; Computer science; Materials science; Mathematics; Geometry; Compression (physics); Composite material","score_opus":0.004694542318712294,"score_gpt":0.17888283487026085,"score_spread":0.17418829255154855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280519010","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00036661956,0.0029631979,0.9292327,0.000056035813,0.0016451497,0.0007421148,0.00011873182,0.00046949988,0.06440595],"genre_scores_gemma":[0.9872813,0.00084993447,0.010031963,0.000017208162,0.00037164468,0.00050897914,0.00023226858,0.00021384747,0.00049280375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881065,0.000008015138,0.0005279519,0.00026954903,0.00018663924,0.00019717187],"domain_scores_gemma":[0.99941176,0.00013110538,0.00007401896,0.000301093,0.000043706477,0.000038321505],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000084346226,0.00031845007,0.00040941162,0.000855658,0.000035333287,0.0000132343785,0.0001328084,0.00036762492,0.0010296112],"category_scores_gemma":[0.000034507895,0.00039485822,0.00012066212,0.00028612427,0.000041568663,0.000083279534,0.000028080916,0.0009301674,0.0000057625903],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033431322,0.0000054010443,0.000036770885,0.00015161996,0.000042789517,0.0000027010367,0.0000972537,0.9236229,0.0007550998,0.047117665,0.0000081602975,0.028156303],"study_design_scores_gemma":[0.00087985606,0.00004973304,0.00009887297,0.0005197898,0.00008716975,0.00014331595,0.000025590849,0.76929325,0.002027786,0.02633692,0.19936612,0.001171584],"about_ca_topic_score_codex":0.000029006937,"about_ca_topic_score_gemma":0.00085131824,"teacher_disagreement_score":0.98691475,"about_ca_system_score_codex":0.0003475686,"about_ca_system_score_gemma":0.0000356556,"threshold_uncertainty_score":0.9998836},"labels":[],"label_agreement":null},{"id":"W4280536417","doi":"10.48550/arxiv.2205.05521","title":"Comparison of Brick and Project Haystack to Support Smart Building Applications","year":2022,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Haystack; Ontology; Brick; Building automation; Computer science; Sustainability; Scalability; Architectural engineering; Engineering; Database; Data science; World Wide Web; Civil engineering","score_opus":0.07460629134241159,"score_gpt":0.2321261595624424,"score_spread":0.1575198682200308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280536417","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71636975,0.00007032594,0.27390483,0.000012968389,0.00033266054,0.0006427696,0.00008825133,0.00023040122,0.008348063],"genre_scores_gemma":[0.9984577,0.00005031931,0.0009405022,0.0000079830925,0.000028209155,0.000012182381,0.00004095151,0.000017416998,0.00044475737],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999304,0.000023305029,0.00018118914,0.0003171743,0.000050898827,0.00012345467],"domain_scores_gemma":[0.9994826,0.00002444457,0.00007607674,0.00029922195,0.00005817961,0.0000595041],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006755273,0.00014697641,0.00022880087,0.00025925142,0.00007926145,0.000021596645,0.00020581353,0.00010682662,0.00011642519],"category_scores_gemma":[0.000004452724,0.0001935125,0.000066333734,0.00037090835,0.000040913652,0.00006282424,0.0002447377,0.000317115,0.0000072424928],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043727097,0.00009496653,0.07118369,0.0006531424,0.00023970907,0.000010317732,0.0010119885,0.79401666,0.0017336603,0.11724268,0.0039465204,0.00982296],"study_design_scores_gemma":[0.0012568525,0.00040861816,0.013974065,0.0002233584,0.00067814277,0.00002865039,0.006656863,0.6929062,0.0060004056,0.012001806,0.26368344,0.002181576],"about_ca_topic_score_codex":0.00010535221,"about_ca_topic_score_gemma":0.00004463963,"teacher_disagreement_score":0.28208795,"about_ca_system_score_codex":0.0001318035,"about_ca_system_score_gemma":0.000060059312,"threshold_uncertainty_score":0.78912103},"labels":[],"label_agreement":null},{"id":"W4280569001","doi":"10.3390/app12105037","title":"Cybersecurity Vulnerabilities in Off-Site Construction","year":2022,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer security; Internet of Things; Construction industry; Industry 4.0; Work (physics); Critical infrastructure; Computer science; Risk analysis (engineering); Business; Engineering; Construction engineering","score_opus":0.008351349716872505,"score_gpt":0.2004828659685329,"score_spread":0.1921315162516604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280569001","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9371817,0.00011315055,0.00018823324,0.00005456801,0.0005853892,0.00007583324,0.000007220768,0.00011961665,0.061674304],"genre_scores_gemma":[0.99916375,0.000008060227,0.00066403236,0.000032418986,0.000026577552,0.000073104056,0.0000025958984,0.000002895775,0.00002657677],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9994553,0.000016341492,0.000118019685,0.00012512792,0.00016839686,0.000116860305],"domain_scores_gemma":[0.9998787,0.000024033065,0.000015003498,0.000059824677,0.000006001828,0.000016452881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002386229,0.000054201835,0.00006122674,0.00011385624,0.00023858022,0.0000296678,0.000089559086,0.000017121913,0.00040920117],"category_scores_gemma":[0.0000032179482,0.000055083336,0.000014657814,0.00041599624,0.00020436208,0.00009834067,0.00002098217,0.00014210939,0.000011491814],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008428074,0.00001792605,0.0119825695,0.000013703064,0.0000053580043,0.0000010393572,0.0032626272,0.07211321,0.0075996537,0.8011239,0.0008397442,0.10303184],"study_design_scores_gemma":[0.002230465,0.00032134392,0.028047487,0.00002892299,0.00002833757,0.0003085874,0.14959508,0.24204956,0.035455365,0.35916537,0.18072589,0.002043604],"about_ca_topic_score_codex":0.00003628085,"about_ca_topic_score_gemma":0.00010716171,"teacher_disagreement_score":0.44195855,"about_ca_system_score_codex":0.000062615116,"about_ca_system_score_gemma":0.000022665343,"threshold_uncertainty_score":0.44804657},"labels":[],"label_agreement":null},{"id":"W4280619952","doi":"10.48550/arxiv.2205.07636","title":"A review of ontologies for smart and continuous commissioning","year":2022,"lang":"en","type":"review","venue":"arXiv (Cornell University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Ontology; Identification (biology); Key (lock); Data science; Domain (mathematical analysis); Readability","score_opus":0.10428019026869542,"score_gpt":0.21526201137347828,"score_spread":0.11098182110478286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280619952","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000005852274,0.99371094,0.0030773384,0.0000021928777,0.0001949702,0.00034267158,0.000032165517,0.00008422341,0.0025496301],"genre_scores_gemma":[0.00012000644,0.99938315,0.000096278476,0.000010786006,0.00001200119,0.0000059075496,0.000034108718,0.000014936165,0.0003228343],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994734,0.000044144777,0.00020156881,0.00016774899,0.0000198492,0.00009329585],"domain_scores_gemma":[0.9995009,0.0001540807,0.00011787042,0.00016601692,0.000029352874,0.00003178367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010455501,0.00014962022,0.0006597844,0.000092299335,0.0000622616,0.000006053827,0.00013367522,0.00008804731,0.00013090557],"category_scores_gemma":[0.00004222272,0.00014597176,0.0001935699,0.00020955414,0.000043780954,0.000055692217,0.00004022471,0.00015687566,0.000001662853],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000027566928,0.0000060977286,0.000011131609,0.08580878,0.00011711623,0.0000048174893,0.000010977004,0.000041097275,1.4249154e-7,0.017059762,0.002202106,0.8947352],"study_design_scores_gemma":[0.00007999003,0.000022900318,4.957269e-7,0.015370844,0.00038869918,0.0000151052,0.00004786762,0.00055764354,3.745105e-7,0.00022089135,0.98315865,0.00013655619],"about_ca_topic_score_codex":0.000008060075,"about_ca_topic_score_gemma":0.0000049512064,"teacher_disagreement_score":0.98095655,"about_ca_system_score_codex":0.0000614908,"about_ca_system_score_gemma":0.00003829808,"threshold_uncertainty_score":0.5952556},"labels":[],"label_agreement":null},{"id":"W4280642564","doi":"10.3390/buildings12050672","title":"Assembly Solution for Modular Buildings: Development of an Automated Connecting Device for Light-Framed Structures","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Engineering; Prefabrication; Rapid prototyping; Process (computing); New product development; Timeline; Manufacturing engineering; Systems engineering; Mechanical engineering; Computer science; Civil engineering","score_opus":0.013916210474353423,"score_gpt":0.258282419130682,"score_spread":0.24436620865632858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280642564","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7064089,0.000092462666,0.29183158,0.00004477893,0.00052356283,0.00040447494,0.000025849175,0.0006240322,0.000044349046],"genre_scores_gemma":[0.75581014,7.014342e-7,0.24374059,0.000027063077,0.000059970454,0.0002616048,0.000056632027,0.000034562167,0.000008737876],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899554,0.00001609198,0.00036882068,0.00021655452,0.00016623018,0.00023676635],"domain_scores_gemma":[0.9995109,0.00005489398,0.00012266816,0.00012560979,0.00013733073,0.00004861492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002799781,0.00015136796,0.00018783855,0.00015308525,0.00041559845,0.000039633236,0.00016842771,0.00007982273,0.000022600172],"category_scores_gemma":[0.000066260705,0.00016832771,0.00006991588,0.00018838147,0.000010435642,0.0001829508,0.000033354336,0.00010748149,3.5146562e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052598563,0.000021426986,0.000021586053,0.00019455688,0.00007466669,2.1367399e-7,0.0014577257,0.030337865,0.8645918,0.008324331,0.00082960504,0.094093636],"study_design_scores_gemma":[0.000581749,0.000088769586,0.00012345365,0.000022555452,0.00003101395,0.000016006265,0.0008161072,0.53760564,0.4060986,0.0012334246,0.053142574,0.00024010343],"about_ca_topic_score_codex":0.0000143069465,"about_ca_topic_score_gemma":0.000014619116,"teacher_disagreement_score":0.5072678,"about_ca_system_score_codex":0.0001937247,"about_ca_system_score_gemma":0.00005296039,"threshold_uncertainty_score":0.68642044},"labels":[],"label_agreement":null},{"id":"W4281479269","doi":"10.1007/978-981-19-0968-9_23","title":"Systematic Literature Review on the Combination of Digital Fabrication, BIM and Off-Site Manufacturing in Construction—A Research Road Map","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Productivity; Context (archaeology); Engineering; Construction industry; Construction engineering; Manufacturing engineering; Operations management; Geography","score_opus":0.01074992711317792,"score_gpt":0.21911182960659265,"score_spread":0.2083619024934147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281479269","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068053543,0.87098324,0.031196374,0.0029416312,0.0054751546,0.010061474,0.00048779088,0.0010057896,0.07104319],"genre_scores_gemma":[0.9649383,0.03360236,0.00019491623,0.000053299053,0.00016100016,0.00023252814,0.00019148727,0.00013977758,0.00048636147],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9984607,0.000045127013,0.000612868,0.0002689219,0.0004153183,0.00019703034],"domain_scores_gemma":[0.9988534,0.0005367164,0.00011323975,0.00035954372,0.0001056119,0.000031506763],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00047323527,0.0003061882,0.00047464922,0.0007599175,0.000054735567,0.00008613153,0.00016980633,0.00023908397,0.00011668517],"category_scores_gemma":[0.00029209064,0.00025586152,0.00007846988,0.00028106163,0.000055269775,0.00016154582,0.000049217284,0.0014245408,0.0000054807447],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038589635,0.000060060098,0.00022968106,0.3469635,0.00048220722,0.00007125523,0.0029473465,0.25268835,0.00038308048,0.3101272,0.00046407338,0.08554466],"study_design_scores_gemma":[0.0017898604,0.0003580664,0.0010124693,0.7485124,0.00030892485,0.0007626976,0.00015425266,0.14968975,0.003285931,0.06440105,0.026419528,0.0033051036],"about_ca_topic_score_codex":0.00000399681,"about_ca_topic_score_gemma":0.000043139466,"teacher_disagreement_score":0.9581329,"about_ca_system_score_codex":0.000282535,"about_ca_system_score_gemma":0.000019286244,"threshold_uncertainty_score":0.9999894},"labels":[],"label_agreement":null},{"id":"W4281482839","doi":"10.1007/978-981-19-0968-9_39","title":"Agent-Based Modelling as a Decision-Support System for Project Delivery Methods","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Integrated project delivery; Schedule; Process (computing); Futures contract; Selection (genetic algorithm); Computer science; Risk analysis (engineering); Operations research; Engineering; Sample (material); Decision support system; Project management; Process management; Systems engineering; Business; Data mining; Artificial intelligence","score_opus":0.021155544105486895,"score_gpt":0.25343638211494945,"score_spread":0.23228083800946256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281482839","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000026305901,0.0018988741,0.97430336,0.000008638461,0.0025212837,0.0007462343,0.00008184643,0.0007561833,0.019657293],"genre_scores_gemma":[0.20783441,0.0004336508,0.78552216,0.00012730467,0.0012329365,0.0016143889,0.00057326263,0.0010660482,0.0015958552],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982088,0.000015512373,0.00061542785,0.00047097265,0.00030763212,0.00038163806],"domain_scores_gemma":[0.9986455,0.0007294008,0.00008996455,0.00039105496,0.00007667794,0.000067403496],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00035340662,0.000578271,0.0005804928,0.0007948569,0.00008165412,0.000062609215,0.00024979404,0.00053197116,0.00036252398],"category_scores_gemma":[0.000070935916,0.0006340003,0.00032355404,0.00015947071,0.0000152043785,0.00009752178,0.000038316237,0.00090517395,0.0000088341885],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025308487,0.0000029731318,4.754166e-7,0.000661028,0.00007912468,0.000017299011,0.00008396615,0.92161834,0.00021987893,0.005558612,0.000055922857,0.07167705],"study_design_scores_gemma":[0.0003470852,0.00005343428,1.6825172e-7,0.00046134234,0.00007702262,0.000049181326,0.0000060664006,0.88905895,0.0013935931,0.0012863157,0.10669335,0.000573477],"about_ca_topic_score_codex":0.000027597482,"about_ca_topic_score_gemma":0.00007249789,"teacher_disagreement_score":0.2078081,"about_ca_system_score_codex":0.00077455584,"about_ca_system_score_gemma":0.00014546834,"threshold_uncertainty_score":0.99961114},"labels":[],"label_agreement":null},{"id":"W4281485011","doi":"10.1007/978-981-19-0968-9_28","title":"An Overview of Modeling Spatial Relationships in Site Layout Planning Literature","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Closeness; Computer science; Field (mathematics); Spatial planning; Process (computing); Plan (archaeology); Operations research; Management science; Geography; Engineering; Environmental planning; Mathematics","score_opus":0.027819058922330303,"score_gpt":0.23448306876346958,"score_spread":0.20666400984113928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281485011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013061656,0.07887234,0.8759296,0.00004853687,0.0027211737,0.0007522622,0.00027212602,0.0008740067,0.027468335],"genre_scores_gemma":[0.9973477,0.0004533185,0.001459261,0.00001135383,0.00022396963,0.000026251793,0.00029284335,0.00012214706,0.000063116844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869937,0.000020500902,0.0005398319,0.00028674933,0.00023069633,0.00022282515],"domain_scores_gemma":[0.999431,0.000120192315,0.00006579752,0.00029975263,0.00003613497,0.00004710888],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018410735,0.00037583342,0.0004233888,0.0007505752,0.000035107598,0.000036239177,0.00015450464,0.0005214006,0.0002305648],"category_scores_gemma":[0.000056369736,0.0004378401,0.0001015755,0.00021434596,0.0000104241235,0.00020508817,0.000028117094,0.0020408663,0.0000020322664],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068631484,0.0000039059237,0.00031748065,0.00032957218,0.000020021977,0.000018463461,0.001333659,0.9880654,0.00031755096,0.0066511384,0.0000020159139,0.0029339362],"study_design_scores_gemma":[0.00018818842,0.000021625323,0.000110625966,0.0016826831,0.000019540472,0.00002108244,0.0000057241373,0.9925194,0.00006923799,0.0033787605,0.0015716212,0.00041151373],"about_ca_topic_score_codex":0.000047413258,"about_ca_topic_score_gemma":0.0011405709,"teacher_disagreement_score":0.98428607,"about_ca_system_score_codex":0.00022991636,"about_ca_system_score_gemma":0.000027320564,"threshold_uncertainty_score":0.99980736},"labels":[],"label_agreement":null},{"id":"W4281486544","doi":"10.1007/978-981-19-0968-9_6","title":"Integrating Building Information Modeling (BIM) and Sustainability Indicators and Criteria to Select Associated Construction Method at the Conceptual Design Stage of Buildings","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Sustainability; Engineering; Systems engineering; Sustainable design; Conceptual design; Architectural engineering; Certification; Modular design; Built environment; Process (computing); Construction engineering; Computer science; Civil engineering; Operations management","score_opus":0.008902102324899722,"score_gpt":0.22904948708594366,"score_spread":0.22014738476104395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281486544","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022492828,0.00065249216,0.9751372,0.000043849075,0.0003190616,0.0005677149,0.000054407745,0.00017370204,0.0005587741],"genre_scores_gemma":[0.9556777,0.00011269472,0.04385769,0.000036567235,0.00005587964,0.00007911426,0.000043392487,0.000076750606,0.00006024959],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985597,0.00005460206,0.00060821965,0.00026745713,0.0002469547,0.00026302977],"domain_scores_gemma":[0.99894714,0.0005345296,0.00015901081,0.00017355847,0.00011976436,0.00006598383],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007058145,0.00038350592,0.00043374984,0.00060028565,0.00013915429,0.00007276992,0.00011928041,0.0003418109,0.00014027],"category_scores_gemma":[0.0007317401,0.00036306577,0.00006120564,0.00027630638,0.000078462945,0.0002904847,0.000115768045,0.00088608544,2.0872199e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019049108,0.0000014708013,0.000084716914,0.00024088133,0.00007208782,8.46544e-7,0.0020309454,0.9435205,0.0015282407,0.022931546,0.000005054354,0.029564692],"study_design_scores_gemma":[0.0003331881,0.000084777865,0.000027004271,0.00030290903,0.00006878013,0.000039346454,0.00031852952,0.9856816,0.004760673,0.004763034,0.0030481564,0.00057198],"about_ca_topic_score_codex":0.00008719471,"about_ca_topic_score_gemma":0.00014702162,"teacher_disagreement_score":0.9331848,"about_ca_system_score_codex":0.00081639184,"about_ca_system_score_gemma":0.000062970634,"threshold_uncertainty_score":0.9998821},"labels":[],"label_agreement":null},{"id":"W4281489976","doi":"10.1007/978-981-19-0968-9_12","title":"From Collaborative BIM to Value-Driven Asset Management: A Case Study","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Asset management; Building information modeling; Asset (computer security); Business; Process management; Portfolio; IT asset management; Knowledge management; Process (computing); Value (mathematics); Computer science; Operations management; Finance; Engineering; Computer security","score_opus":0.0072846678947106665,"score_gpt":0.21134138377888867,"score_spread":0.204056715884178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281489976","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032989882,0.0049859877,0.6972262,0.00026386778,0.013580279,0.0075556827,0.0018846986,0.0040385965,0.23747477],"genre_scores_gemma":[0.9921141,0.0000852972,0.005708862,0.000060263614,0.00053547387,0.00037809735,0.000118604345,0.00026659537,0.00073270814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984966,0.000017898305,0.00041107723,0.00047751394,0.00031577592,0.00028117053],"domain_scores_gemma":[0.9992351,0.0001520378,0.000049562383,0.0004281742,0.00004164827,0.00009348213],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000081490034,0.0005326101,0.00045533752,0.0006623934,0.00006731122,0.000076343444,0.00021257832,0.00024826932,0.000964653],"category_scores_gemma":[0.000023580173,0.00061304966,0.00008919226,0.00033814236,0.000011283326,0.000097358585,0.00011206739,0.0009148435,0.000030550036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007642558,0.000018351753,0.000035878857,0.000072395036,0.00036741036,0.0023570932,0.0018043607,0.9803698,0.000062230596,0.0051081483,0.00013841243,0.009658271],"study_design_scores_gemma":[0.004359989,0.00090042193,0.00035117465,0.0018972227,0.0013014968,0.0016581854,0.002525025,0.49773672,0.00066678406,0.015488195,0.46571812,0.0073966556],"about_ca_topic_score_codex":0.00015605072,"about_ca_topic_score_gemma":0.002663614,"teacher_disagreement_score":0.9591242,"about_ca_system_score_codex":0.0004729498,"about_ca_system_score_gemma":0.000021664955,"threshold_uncertainty_score":0.9999486},"labels":[],"label_agreement":null},{"id":"W4281490267","doi":"10.1007/978-981-19-0968-9","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021","year":2022,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of Regina; Western University; Concordia University; Okanagan University College; University of Waterloo","funders":"","keywords":"Engineering ethics; Political science; Engineering; Civil society; Library science; Law; Computer science","score_opus":0.005025023668963167,"score_gpt":0.1690921060614327,"score_spread":0.16406708239246953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281490267","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027458446,0.031855002,0.20606151,0.0017553874,0.03552005,0.008424006,0.005401575,0.0029722552,0.68055177],"genre_scores_gemma":[0.99673,0.00014464001,0.0010276568,0.000023929153,0.00031409788,0.00006945693,0.00004132817,0.00014404478,0.0015048258],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984551,0.0000041581225,0.00050585653,0.00027031117,0.00037768664,0.00038690332],"domain_scores_gemma":[0.9993033,0.00009799044,0.00011636608,0.00022948378,0.00016401183,0.000088849134],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015766705,0.00042356833,0.00049484347,0.00032916313,0.0000562415,0.000033228633,0.00043313907,0.0005134282,0.0006411661],"category_scores_gemma":[0.000088469715,0.000417445,0.00026180327,0.00049674005,0.00005520466,0.0001130735,0.00007618599,0.0014644156,0.0000010518698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002726256,0.0000068950626,0.00024404515,0.0014757437,0.0001789134,0.000001732288,0.0025425882,0.98201466,0.0036111798,0.0034225476,0.004033472,0.0024654884],"study_design_scores_gemma":[0.00084585027,0.000101081205,0.0012298181,0.0037360142,0.00022357302,0.00010516908,0.00019483027,0.6909767,0.01973403,0.0023214507,0.27822053,0.0023109666],"about_ca_topic_score_codex":0.0011823514,"about_ca_topic_score_gemma":0.07553564,"teacher_disagreement_score":0.9692716,"about_ca_system_score_codex":0.00087275886,"about_ca_system_score_gemma":0.00043522855,"threshold_uncertainty_score":0.99982774},"labels":[],"label_agreement":null},{"id":"W4281659795","doi":"10.1061/(asce)cp.1943-5487.0001023","title":"Physical Distancing Analytics for Construction Planning Using 4D BIM","year":2022,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Schedule; Computer science; Social distance; Building information modeling; Facility management; Relocation; Risk analysis (engineering); Operations research; Simulation; Engineering; Coronavirus disease 2019 (COVID-19); Operations management; Scheduling (production processes); Business; Artificial intelligence; Robot","score_opus":0.01325730190124799,"score_gpt":0.2387156639985258,"score_spread":0.22545836209727782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281659795","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48566145,0.000108346954,0.51320523,0.0000047646536,0.00090143917,0.00003727723,0.0000019207596,0.00003654361,0.000043035794],"genre_scores_gemma":[0.9734868,0.0000014887719,0.026076157,0.0000046798627,0.0004002923,0.0000016994989,0.000001285923,0.000026913613,6.754363e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990743,0.000014893035,0.00043857435,0.00007960709,0.00019844495,0.0001941792],"domain_scores_gemma":[0.9995625,0.00013109668,0.00013962267,0.000063264306,0.00006119157,0.00004233656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003051765,0.00012117647,0.00023938528,0.00036170337,0.00011899277,0.000047010526,0.000104482286,0.00003000316,0.000005719162],"category_scores_gemma":[0.00003953368,0.00013828337,0.0000943589,0.00035622806,0.000014218289,0.00013634963,0.000023851628,0.0004298649,7.2168234e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007769138,0.000008811717,0.00085024675,0.00005345503,0.000029064437,0.0000069688667,0.00032108495,0.98641187,0.0068536852,0.0029490055,0.000010836572,0.0024971748],"study_design_scores_gemma":[0.00036171658,0.000047822017,0.0003739656,0.00011959656,0.000022374026,0.00031313143,0.0005154242,0.99600065,0.0013019268,0.00034126634,0.0004652944,0.00013684704],"about_ca_topic_score_codex":0.0000016611353,"about_ca_topic_score_gemma":0.0000018472391,"teacher_disagreement_score":0.48782536,"about_ca_system_score_codex":0.0003499464,"about_ca_system_score_gemma":0.00004146956,"threshold_uncertainty_score":0.5639032},"labels":[],"label_agreement":null},{"id":"W4282564378","doi":"10.1108/ecam-02-2022-0170","title":"The latest operational, contractual and organizational trends in IPD literature: review and future directions","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Thematic analysis; Systematic review; Domain (mathematical analysis); Knowledge management; Management science; Computer science; Data science; Political science; Qualitative research; Engineering; Sociology; Social science; Geography; MEDLINE","score_opus":0.002117895599477319,"score_gpt":0.17350870817634415,"score_spread":0.17139081257686684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4282564378","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25067535,0.6453558,0.010788042,0.056292,0.016718246,0.0037362718,0.00038368144,0.0032265831,0.012824014],"genre_scores_gemma":[0.94920164,0.044574574,0.0042721024,0.00032725104,0.00043930253,0.00044376336,0.00019652887,0.000054957865,0.0004898941],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992969,0.000030538376,0.00021994444,0.00016980387,0.0001389055,0.00014391348],"domain_scores_gemma":[0.99977404,0.000034866243,0.000024147446,0.00010173087,0.000024529834,0.00004071037],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001118981,0.00014762276,0.000115445895,0.00023673457,0.00033321473,0.000100710546,0.00006644096,0.000024344408,0.00011684189],"category_scores_gemma":[0.0000067407877,0.00012687908,0.000023932813,0.00065808534,0.000045085628,0.000108123226,0.000051697003,0.00030930238,8.4158376e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013393305,0.000013156768,0.0005546274,0.00035615542,0.00017976873,0.000012075245,0.0005227353,0.0476756,0.0001475597,0.13245809,0.0012555205,0.8168113],"study_design_scores_gemma":[0.0011835905,0.00006826774,0.05813329,0.00028216702,0.00015243012,0.00317848,0.00060243154,0.055598076,0.000039548657,0.0012469538,0.8787341,0.00078063254],"about_ca_topic_score_codex":0.0000018935019,"about_ca_topic_score_gemma":0.000009538068,"teacher_disagreement_score":0.8774786,"about_ca_system_score_codex":0.000072481445,"about_ca_system_score_gemma":0.000004559731,"threshold_uncertainty_score":0.5173979},"labels":[],"label_agreement":null},{"id":"W4282968354","doi":"10.1016/j.autcon.2022.104394","title":"Tolerance management domain model for semantic enrichment of BIMs","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Danmarks Frie Forskningsfond; Teknologi og Produktion, Det Frie Forskningsråd","keywords":"Computer science; Domain (mathematical analysis); Domain model; Natural language processing; Software engineering; Mathematics; Domain knowledge","score_opus":0.007508623054453583,"score_gpt":0.21126244725183455,"score_spread":0.20375382419738097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4282968354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41107047,0.00005775119,0.58542424,0.00005919085,0.00094835396,0.00043428823,0.00002167226,0.00017501191,0.0018090198],"genre_scores_gemma":[0.9661118,0.000016675813,0.033268493,0.000014115949,0.00001829144,0.0004626915,0.000026519985,0.000010622358,0.00007081543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992647,0.000021089456,0.00033271607,0.00011992189,0.00015833891,0.00010322475],"domain_scores_gemma":[0.99975383,0.000015479603,0.00007257884,0.00011391119,0.000030215317,0.000013979962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014583331,0.0000805813,0.00010723686,0.00024117347,0.00008138418,0.000009975513,0.00006233914,0.00002944487,0.000061323364],"category_scores_gemma":[0.0000020527464,0.00009736104,0.00004163979,0.00027461577,0.000027174985,0.00012604271,0.0000146290195,0.0000704187,0.0000016661784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015935198,0.00001883728,0.0007726475,0.00013813823,0.000021718486,2.8218523e-7,0.0004538828,0.76784754,0.0019198245,0.15067314,0.0002692974,0.07786879],"study_design_scores_gemma":[0.0005393259,0.000017108978,0.0010409171,0.000016632355,0.000009611419,0.000016123497,0.00082398753,0.9798995,0.00089464406,0.01609003,0.000555736,0.000096366886],"about_ca_topic_score_codex":0.000004342874,"about_ca_topic_score_gemma":0.000006551961,"teacher_disagreement_score":0.5550413,"about_ca_system_score_codex":0.0001660356,"about_ca_system_score_gemma":0.000012895842,"threshold_uncertainty_score":0.39702678},"labels":[],"label_agreement":null},{"id":"W4283260199","doi":"10.1016/j.autcon.2022.104441","title":"Learning-driven construction productivity prediction for prefabricated external insulation wall system","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Institute for Advancement of Technology; Ministry of Trade, Industry and Energy","keywords":"Productivity; Engineering; Learning effect; Construction industry; Economic shortage; Industrial engineering; Computer science; Machine learning; Artificial intelligence; Construction engineering","score_opus":0.007856629503674932,"score_gpt":0.19978835231756842,"score_spread":0.19193172281389348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283260199","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81899154,0.00005778718,0.17334487,0.00009204216,0.003703841,0.0010688483,0.00005640402,0.0018190703,0.0008655789],"genre_scores_gemma":[0.99043113,0.000009786406,0.007953324,0.0000063921666,0.00023977735,0.0010222492,0.00025221522,0.000038838243,0.000046284684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99814034,0.00020467649,0.0006674711,0.00038420383,0.00035662664,0.00024666495],"domain_scores_gemma":[0.9992624,0.000058751517,0.00025580206,0.00019590148,0.00017754955,0.000049631355],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003973852,0.00021468777,0.00022340204,0.0005630886,0.0004913661,0.00007129183,0.00010490033,0.0001323451,0.00008140898],"category_scores_gemma":[0.000049882452,0.00026716487,0.00008385482,0.00069484423,0.00008474443,0.0006988723,0.000025013847,0.0004150417,0.000009299423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012769981,0.000052108648,0.044902682,0.00026655837,0.00006012938,0.0000011125544,0.0007664543,0.7085604,0.031916,0.030978182,0.00017422737,0.18219443],"study_design_scores_gemma":[0.0011098724,0.00014329053,0.039923985,0.00005339804,0.00003723894,0.0003726893,0.0016632866,0.94976306,0.0029213142,0.001328531,0.0024088407,0.00027451123],"about_ca_topic_score_codex":0.000033331566,"about_ca_topic_score_gemma":0.000009646806,"teacher_disagreement_score":0.24120262,"about_ca_system_score_codex":0.0011204259,"about_ca_system_score_gemma":0.00006681826,"threshold_uncertainty_score":0.99997807},"labels":[],"label_agreement":null},{"id":"W4283367604","doi":"10.1061/(asce)co.1943-7862.0002330","title":"Implementing Construction Planning and Control Software: A Specialized Contractor Perspective","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Control (management); Software; Computer science; Order (exchange); Quality (philosophy); Process management; Digital transformation; Complementarity (molecular biology); Perspective (graphical); Knowledge management; Engineering management; Business; Engineering","score_opus":0.004252576246389947,"score_gpt":0.19895317556141334,"score_spread":0.1947005993150234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283367604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31565833,0.004325978,0.67279893,0.0002481972,0.004710506,0.00042821205,0.000029058827,0.00029379243,0.0015069647],"genre_scores_gemma":[0.97753435,0.0002912886,0.021841941,0.00002635855,0.00024236842,0.000021556878,0.0000015838659,0.000021332828,0.000019245846],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99906296,0.000024502735,0.0003919276,0.00011576136,0.00021124771,0.00019363423],"domain_scores_gemma":[0.9995872,0.0000363765,0.0001579779,0.00006120023,0.000083645784,0.00007360528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028740248,0.0001441758,0.00022277325,0.00034944984,0.00020740104,0.00007041631,0.00005253631,0.000030659838,0.000066681416],"category_scores_gemma":[0.000017579066,0.00015519645,0.000057326673,0.00014742318,0.000048779682,0.00022108779,0.000034362696,0.00027563862,2.545068e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036080397,0.000050843406,0.0069364454,0.0004605733,0.0023566247,0.00016617152,0.001982767,0.18294264,0.0064531355,0.30961224,0.0010552659,0.4876225],"study_design_scores_gemma":[0.028224451,0.001144035,0.03952444,0.00061179796,0.0020389685,0.03298507,0.08561627,0.16252722,0.0022575841,0.013138238,0.6291388,0.0027931132],"about_ca_topic_score_codex":0.0000031405004,"about_ca_topic_score_gemma":5.0724236e-7,"teacher_disagreement_score":0.66187596,"about_ca_system_score_codex":0.00015784484,"about_ca_system_score_gemma":0.000012565144,"threshold_uncertainty_score":0.63287276},"labels":[],"label_agreement":null},{"id":"W4283641014","doi":"10.3390/jrfm15070282","title":"Identification of Risk Factors in Business Valuation","year":2022,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Valuation (finance); Business valuation; Actuarial science; Income approach; Risk analysis (engineering); Business; Pre-money valuation; Market value; Risk assessment; Computer science; Finance","score_opus":0.006847556807651239,"score_gpt":0.19631831266724767,"score_spread":0.18947075585959644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283641014","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9176974,0.00023992291,0.08124411,0.0000072693406,0.00066735654,0.00005368116,0.0000115950925,0.0000050459394,0.000073563344],"genre_scores_gemma":[0.99839294,0.0013999216,0.00015380354,0.0000015510881,0.000034802688,0.0000035802511,0.0000019825359,0.000003543288,0.000007885381],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994036,0.000033769986,0.0003255579,0.000040857976,0.00015257047,0.000043618],"domain_scores_gemma":[0.999677,0.000015248796,0.00020158065,0.00004297171,0.000052501106,0.000010676876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003551192,0.000043582557,0.00008767065,0.000240512,0.000054009783,0.000009807239,0.000046231617,0.000015489346,0.000014047929],"category_scores_gemma":[0.000033283042,0.000041658517,0.000026737904,0.00027211022,0.0000097008715,0.00009933819,0.00001409114,0.00011800559,2.9616393e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067709196,0.00007265323,0.10300923,0.00006977852,0.000025530017,0.000004624609,0.0023516493,0.17401169,0.00049637613,0.010884599,0.0002591098,0.708747],"study_design_scores_gemma":[0.00037478821,0.000024399282,0.9847016,0.000013013159,0.00004982193,0.0000033273705,0.0010346653,0.003659592,0.00030321174,0.0061677652,0.0036121323,0.00005572595],"about_ca_topic_score_codex":0.00003000032,"about_ca_topic_score_gemma":0.00001863505,"teacher_disagreement_score":0.88169235,"about_ca_system_score_codex":0.000048383947,"about_ca_system_score_gemma":0.0000072060807,"threshold_uncertainty_score":0.1698785},"labels":[],"label_agreement":null},{"id":"W4283715309","doi":"10.1139/cjce-2021-0649","title":"Knowing what is going on—a smart contract for modular construction","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Enforcement; Benchmark (surveying); Documentation; Computer science; Incentive; Reliability (semiconductor); Unit (ring theory); Schedule; Contract management; Productivity; Operations research; Engineering management; Engineering; Business; Operating system","score_opus":0.006076471834522953,"score_gpt":0.1719357941967915,"score_spread":0.16585932236226855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283715309","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49189,0.020570166,0.43074438,0.0015565967,0.04567124,0.0009453437,0.0002205874,0.00036885656,0.00803282],"genre_scores_gemma":[0.9988065,0.000054386946,0.0006757649,0.00010158415,0.00026549224,0.000016637434,0.0000036809167,0.000036454177,0.000039546718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992161,0.000009955525,0.0003051423,0.00008263122,0.00013690801,0.00024930373],"domain_scores_gemma":[0.999481,0.000049756873,0.00006191417,0.00009297043,0.00008163876,0.00023270084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019887491,0.00012796327,0.00017310912,0.00041618795,0.00016948725,0.000121057834,0.00011759441,0.000046968707,0.00036902115],"category_scores_gemma":[0.00003070316,0.00015133245,0.00013061774,0.0001646767,0.000014653332,0.00043182113,0.0000035346932,0.00035334687,0.00000239348],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009223302,0.000002737736,0.00020604269,0.000051617306,0.00011118019,0.000024250998,0.00049442233,0.9529268,0.0024189204,0.0036328807,0.0017515727,0.03837036],"study_design_scores_gemma":[0.001067508,0.00020882796,0.00038009873,0.00035672353,0.000069333975,0.0012423245,0.0013308334,0.58283365,0.00374439,0.00064888736,0.40762028,0.00049718586],"about_ca_topic_score_codex":0.00006278996,"about_ca_topic_score_gemma":0.0019556414,"teacher_disagreement_score":0.5069164,"about_ca_system_score_codex":0.00040528591,"about_ca_system_score_gemma":0.00017557632,"threshold_uncertainty_score":0.6171158},"labels":[],"label_agreement":null},{"id":"W4284681806","doi":"10.3390/buildings12070955","title":"Mass Customization of Housing: A Framework for Harmonizing Individual Needs with Factory Produced Housing","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Mass customization; Flexibility (engineering); Agile software development; Personalization; Pace; Process (computing); Process management; Prefabrication; Housing industry; Production (economics); Factory (object-oriented programming); Computer science; Engineering; Systems engineering; Architectural engineering; Risk analysis (engineering); Manufacturing engineering; Business; Software engineering; World Wide Web","score_opus":0.025925038147180016,"score_gpt":0.21725381853999992,"score_spread":0.19132878039281992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284681806","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59412664,0.00010475432,0.40480918,0.000050810417,0.00034036502,0.00022812365,0.000019135146,0.00019718416,0.0001238355],"genre_scores_gemma":[0.9551904,0.0000037011075,0.04452475,0.000032040683,0.00009227753,0.00008378284,0.000017931561,0.000042426815,0.000012696928],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99932486,0.000014059672,0.00018205379,0.00012779323,0.00019845359,0.00015278324],"domain_scores_gemma":[0.9996724,0.000037505215,0.00008699189,0.00011275377,0.0000634403,0.000026901045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012951564,0.00011167411,0.00013240136,0.00021904345,0.00017002739,0.000039603197,0.00009914176,0.00005366568,0.000034089113],"category_scores_gemma":[0.000027017666,0.00011477533,0.000039855604,0.0004254425,0.000026881646,0.00014144534,0.000019767675,0.00019048658,3.7282354e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043876152,0.00011508803,0.034110054,0.000679161,0.0005286946,0.000003609715,0.01655013,0.42422777,0.31183907,0.06778947,0.004329771,0.13938843],"study_design_scores_gemma":[0.0046583307,0.0009700075,0.0030859709,0.0006569253,0.0006617953,0.00008508046,0.023995968,0.11360328,0.76598364,0.011082455,0.07280028,0.0024162908],"about_ca_topic_score_codex":0.000009310038,"about_ca_topic_score_gemma":9.864626e-7,"teacher_disagreement_score":0.45414457,"about_ca_system_score_codex":0.00010115675,"about_ca_system_score_gemma":0.000041346473,"threshold_uncertainty_score":0.4680402},"labels":[],"label_agreement":null},{"id":"W4284686519","doi":"10.3390/buildings12070960","title":"A Predictive Analytics Framework for Mobile Crane Configuration Selection in Heavy Industrial Construction Projects","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Heuristic; Analytics; Predictive analytics; Selection (genetic algorithm); Artificial neural network; Computer science; Variety (cybernetics); Engineering; Project management; Set (abstract data type); Industrial engineering; Systems engineering; Machine learning; Data mining; Artificial intelligence","score_opus":0.018047240846257816,"score_gpt":0.23900273816018433,"score_spread":0.22095549731392652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284686519","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6218251,0.00008078944,0.37395823,0.00008035017,0.0017083,0.0013502277,0.000059677714,0.0003640149,0.00057329],"genre_scores_gemma":[0.9924652,0.000012330749,0.006018873,0.0000244314,0.00029385794,0.0010887139,0.00003862548,0.000021485377,0.00003648379],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991811,0.00004179622,0.00026109314,0.00018643806,0.00016011621,0.00016945388],"domain_scores_gemma":[0.9996952,0.00008239877,0.00006688781,0.000059118407,0.000066256995,0.00003014282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021594351,0.00011506175,0.00013783734,0.00024402597,0.00016678974,0.000042150543,0.00005827946,0.00013558034,0.00013146402],"category_scores_gemma":[0.00007758398,0.00013714102,0.000048285263,0.00058584707,0.000030931038,0.00017509534,0.000010250854,0.00039645802,0.000001458034],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016271076,0.00016461592,0.01183323,0.0001341083,0.00019062102,0.0000026958853,0.003419904,0.5957927,0.025525628,0.13842557,0.006656022,0.21622775],"study_design_scores_gemma":[0.00425671,0.0017943063,0.0014804723,0.00015376948,0.00014762218,0.00022314707,0.009992956,0.7976723,0.070325784,0.027369553,0.08561522,0.00096816156],"about_ca_topic_score_codex":0.00003535905,"about_ca_topic_score_gemma":0.000011622899,"teacher_disagreement_score":0.37064007,"about_ca_system_score_codex":0.00039944696,"about_ca_system_score_gemma":0.00007338689,"threshold_uncertainty_score":0.5592448},"labels":[],"label_agreement":null},{"id":"W4284899645","doi":"10.36680/j.itcon.2022.031","title":"An earned-value-analysis (EVA)-based project control framework in large-scale scaffolding projects using linear regression modeling","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Earned value management; Schedule; Productivity; Computer science; Project management; Scale (ratio); Scaffold; Engineering; Industrial engineering; Systems engineering; Operations research; Project planning; OPM3","score_opus":0.010298853933732635,"score_gpt":0.2622751645378014,"score_spread":0.2519763106040688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284899645","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5436639,0.000052334555,0.45555303,0.00008629052,0.00036589813,0.00015764666,0.00000796631,0.00008625576,0.000026668271],"genre_scores_gemma":[0.92998534,0.000018329389,0.0698673,0.000041692758,0.00004188777,0.000021356915,0.00001301407,0.000010787382,2.936758e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99805266,0.000116204996,0.001131466,0.00010977232,0.00035445605,0.00023542088],"domain_scores_gemma":[0.99900043,0.000032928554,0.000528647,0.00019829985,0.0002077021,0.000031970823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008938323,0.00016334634,0.00037580245,0.005367152,0.0001842656,0.000048085087,0.0002086871,0.0002943433,0.000034094926],"category_scores_gemma":[0.00009951542,0.00016227426,0.00012239117,0.002815953,0.000052734686,0.0013963927,0.000021169244,0.0010548362,8.39601e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008614712,0.000028408711,0.02382735,0.000020183414,0.000060717088,0.0000029422372,0.0005590872,0.96070355,0.0009242632,0.0018125719,0.0000031110453,0.011971643],"study_design_scores_gemma":[0.0010960179,0.000099234094,0.00016377057,0.00009906242,0.0000919846,0.00019998192,0.0094744945,0.9849226,0.0018920879,0.0017637978,0.00004632873,0.00015068118],"about_ca_topic_score_codex":0.000024433495,"about_ca_topic_score_gemma":0.000016577314,"teacher_disagreement_score":0.38632143,"about_ca_system_score_codex":0.0005799502,"about_ca_system_score_gemma":0.00019540355,"threshold_uncertainty_score":0.6617352},"labels":[],"label_agreement":null},{"id":"W4285014555","doi":"10.5539/mas.v16n3p19","title":"From Months to Days—An Efficient Microsoft-Excel Database: A Case of Dam Maintenance in United Arab Emirates","year":2022,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Microsoft excel; Computer science; Duration (music); Work (physics); Software; Outcome (game theory); Engineering management; Database; Operations management; Operations research; Engineering; Operating system","score_opus":0.011600831129663243,"score_gpt":0.2281561626566065,"score_spread":0.21655533152694326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285014555","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89122236,0.000034392604,0.107204996,0.000019794725,0.00018588628,0.0002106371,0.00020121159,0.000078358564,0.00084235484],"genre_scores_gemma":[0.99655503,0.0000011729353,0.003186926,0.00006462258,0.000016296633,0.000111352776,0.000034573088,0.000011882434,0.000018164403],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888796,0.000013928077,0.00023212541,0.00035218024,0.00025947156,0.00025432577],"domain_scores_gemma":[0.99942106,0.00002393475,0.000036891353,0.0003818695,0.000042754502,0.00009349663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030007624,0.00011483791,0.00012423655,0.000320134,0.0001781837,0.000041630792,0.00036038703,0.000022132368,0.00006957174],"category_scores_gemma":[0.000013396861,0.00011920544,0.000015289093,0.0012910495,0.00014444554,0.00009914716,0.00012822726,0.00018345493,0.000006442093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001899206,0.000036623165,0.00007247027,0.0000063047273,0.0000017377666,0.000020996578,0.0023598012,0.38746822,0.60263777,0.0018526631,0.000045157747,0.00547928],"study_design_scores_gemma":[0.00023817478,0.000016933596,0.0003332835,0.000010650394,0.0000030793599,0.000041428484,0.0021879734,0.9549636,0.041342665,0.00045042133,0.00025764568,0.00015415017],"about_ca_topic_score_codex":0.0007623754,"about_ca_topic_score_gemma":0.00026034398,"teacher_disagreement_score":0.56749535,"about_ca_system_score_codex":0.00016690689,"about_ca_system_score_gemma":0.000059364644,"threshold_uncertainty_score":0.48610568},"labels":[],"label_agreement":null},{"id":"W4285079991","doi":"10.1109/cscwd49262.2021.9437725","title":"Proceedings of the 2021 IEEE 24th International Conference on Computer Supported Cooperative Work in Design (CSCWD)","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Computer science; Work (physics); Software engineering; Engineering; Mechanical engineering","score_opus":0.02436899832137518,"score_gpt":0.21931362135582777,"score_spread":0.1949446230344526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285079991","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6612685,0.000025969803,0.15923224,0.0012632204,0.003653201,0.00042751845,0.000012356552,0.00012225393,0.17399478],"genre_scores_gemma":[0.99623984,0.00001289259,0.0027289705,0.00006224945,0.000054190255,0.000010311711,0.0000028833888,0.0000050754497,0.0008836005],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995977,0.000008769707,0.00014214547,0.00008995873,0.00009904476,0.00006233431],"domain_scores_gemma":[0.9996977,0.000016197167,0.0000191611,0.000043247273,0.00020994067,0.000013747477],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000042350923,0.00006479074,0.000073969364,0.000034739583,0.000014033178,0.00003322693,0.00007766176,0.00004215203,0.0010384643],"category_scores_gemma":[0.000007184522,0.000047130965,0.000022280328,0.00021946237,0.00002540938,0.000075086,0.000010296054,0.00011391222,0.000011331234],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001845224,0.0002800077,0.02276675,0.00006256856,0.00034312886,0.0000130846,0.0042370935,0.07263755,0.18320021,0.56075114,0.06677278,0.08875118],"study_design_scores_gemma":[0.00083804294,0.000057181205,0.01823503,0.00031396793,0.000011597661,0.00002406077,0.0013190882,0.32084438,0.6556988,0.0009266265,0.0014510656,0.00028018863],"about_ca_topic_score_codex":0.000003507248,"about_ca_topic_score_gemma":0.000018987916,"teacher_disagreement_score":0.55982447,"about_ca_system_score_codex":0.000031258198,"about_ca_system_score_gemma":0.000034369765,"threshold_uncertainty_score":0.9998747},"labels":[],"label_agreement":null},{"id":"W4285082882","doi":"10.35490/ec3.2022.144","title":"Utilizing simulation to predict optimum number of projects","year":2022,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interdependence; Computer science; Profit (economics); Discrete event simulation; Operations research; Software; Monte Carlo method; Work (physics); Capacity planning; Industrial engineering; Simulation; Engineering","score_opus":0.016806357826063018,"score_gpt":0.25699827949545556,"score_spread":0.24019192166939254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285082882","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9328225,0.000019760637,0.060322456,0.000012648756,0.0015853883,0.00020444812,0.0000050711647,0.00020223437,0.004825496],"genre_scores_gemma":[0.9887375,0.0000010124897,0.011135439,0.000010765364,0.00007233149,0.000013950368,0.0000075497583,0.000013412467,0.00000804474],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992166,0.000043786,0.00030410523,0.00014368824,0.0001612119,0.00013059843],"domain_scores_gemma":[0.9997102,0.000051955987,0.000054509484,0.000109753426,0.000047555855,0.000026045602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016180638,0.00008631366,0.00011901862,0.00018947391,0.00009479036,0.0000135527225,0.00007174654,0.00003680589,0.0001038501],"category_scores_gemma":[0.000025324123,0.000107928,0.00003175987,0.00052653067,0.000027063787,0.000083043655,0.000045511923,0.00018497279,0.0000047777994],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010149079,0.0000073774268,0.035321586,0.000023447203,0.000006714116,5.499197e-7,0.00041037705,0.8890006,0.00082181994,0.0019080377,0.000040530485,0.07244884],"study_design_scores_gemma":[0.0002624454,0.000025978068,0.005921077,0.00003858389,0.0000054881048,0.00006843734,0.0012348428,0.9901806,0.0010975463,0.00032437601,0.0007184098,0.00012217877],"about_ca_topic_score_codex":0.000016752112,"about_ca_topic_score_gemma":0.000003316959,"teacher_disagreement_score":0.10118007,"about_ca_system_score_codex":0.00014836703,"about_ca_system_score_gemma":0.000026145883,"threshold_uncertainty_score":0.4401176},"labels":[],"label_agreement":null},{"id":"W4285157518","doi":"10.1109/tii.2022.3190566","title":"Multiobjective Evolutionary Model of the Construction Industry Based on Network Planning","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brandon University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Computer science; Multi-objective optimization; Pareto principle; Genetic algorithm; Network planning and design; Scheduling (production processes); Flexibility (engineering); Mathematics","score_opus":0.02949107827831661,"score_gpt":0.2169477818313864,"score_spread":0.18745670355306981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285157518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13534708,0.000010536211,0.84559864,0.0001149389,0.007912562,0.00072207715,0.00049858895,0.0003319974,0.009463577],"genre_scores_gemma":[0.9980621,0.0000014287185,0.0014993304,0.0001225778,0.00010904572,0.00011361448,0.000008125482,0.000017397433,0.0000664259],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987712,0.00006383488,0.00051043835,0.00007626976,0.00039337337,0.00018487919],"domain_scores_gemma":[0.9994109,0.00009434963,0.00015148941,0.00023913039,0.00005843412,0.0000456572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015064895,0.00016375526,0.00015595429,0.00018377135,0.00054505956,0.000018843028,0.00016140855,0.00027946703,0.00014418979],"category_scores_gemma":[0.000006730638,0.00014936177,0.00012458285,0.00057637796,0.00009884348,0.00018909344,0.0000023723642,0.0017493991,0.000003588188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008446786,0.000030461108,0.00007791831,0.000008168199,0.000034376524,8.8585026e-8,0.00031899786,0.99076223,0.0000360532,0.00044702497,0.0014799896,0.0067202076],"study_design_scores_gemma":[0.0007734632,0.00009768044,0.00002539602,0.000055281536,0.00003656325,0.000010700175,0.0015158745,0.99339914,0.0031916546,0.00017531872,0.00057035394,0.00014859436],"about_ca_topic_score_codex":0.000009180592,"about_ca_topic_score_gemma":0.0000014487575,"teacher_disagreement_score":0.86271495,"about_ca_system_score_codex":0.0003337466,"about_ca_system_score_gemma":0.00021770975,"threshold_uncertainty_score":0.7600366},"labels":[],"label_agreement":null},{"id":"W4285181045","doi":"10.5267/j.uscm.2022.5.007","title":"Discrete-event simulation-based decision making of Just-In-Time strategies for precast concrete supply chain using batch delivery and offsite inventory level","year":2022,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Kasetsart University","keywords":"Precast concrete; Supply chain; Lead time; Discrete event simulation; Operations management; Computer science; Supply chain management; Scheduling (production processes); Operations research; Decision support system; Risk analysis (engineering); Business; Engineering; Simulation; Marketing; Civil engineering","score_opus":0.025506970730764685,"score_gpt":0.2653178486600392,"score_spread":0.23981087792927452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285181045","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6564685,0.00039426354,0.34046733,0.00009371965,0.0004143029,0.0014889161,0.00027052665,0.00010769316,0.00029475495],"genre_scores_gemma":[0.99132943,0.000015096708,0.008026222,0.000091567475,0.000043521213,0.00021619946,0.000120050434,0.00004171434,0.00011619618],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983022,0.00009467468,0.00053837773,0.0003398556,0.0004140884,0.00031077536],"domain_scores_gemma":[0.99927014,0.00026229484,0.00012718818,0.0002374406,0.00005986602,0.00004307899],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00056117633,0.00024816982,0.00028318653,0.0004610157,0.00018680151,0.00007446138,0.00019872768,0.000063024425,0.00022959837],"category_scores_gemma":[0.000015739186,0.000277893,0.00010006491,0.00032388067,0.00006271405,0.00018895026,0.000111784015,0.00014836174,0.0000011248026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017151512,0.000012490943,0.002243495,0.00027071842,0.000061470084,0.000006813299,0.0006733096,0.9798211,0.000685096,0.0021461628,0.00019716371,0.013710706],"study_design_scores_gemma":[0.0011935228,0.000086545915,0.000921873,0.00021764498,0.000054452576,0.0000016512039,0.004174867,0.99031687,0.00010273106,0.0011390685,0.0015096753,0.00028111404],"about_ca_topic_score_codex":0.00009112508,"about_ca_topic_score_gemma":0.00006999792,"teacher_disagreement_score":0.33486095,"about_ca_system_score_codex":0.0004218257,"about_ca_system_score_gemma":0.000050858012,"threshold_uncertainty_score":0.99996734},"labels":[],"label_agreement":null},{"id":"W4285796201","doi":"10.3390/buildings12071043","title":"Predictive Analytics for Early-Stage Construction Costs Estimation","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Predictive analytics; Analytics; Computer science; Activity-based costing; Cost estimate; Implementation; Data science; Estimation; Software analytics; Risk analysis (engineering); Engineering; Software; Business; Software engineering; Systems engineering; Marketing; Software development","score_opus":0.008180053047348129,"score_gpt":0.21752719434793674,"score_spread":0.20934714130058862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285796201","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39272395,0.000041242864,0.6024059,0.000052701584,0.0010420479,0.0002881978,0.00012427237,0.00035412854,0.0029675807],"genre_scores_gemma":[0.9862486,0.00000612444,0.01321895,0.000022787106,0.00006677116,0.00016749343,0.000042774016,0.000017695407,0.00020881458],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995031,0.000009181474,0.00014267185,0.00011079039,0.00012326828,0.000111002846],"domain_scores_gemma":[0.9997753,0.000026689364,0.000039749368,0.000079403166,0.000048988044,0.000029871126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008124616,0.00007769703,0.00007626695,0.00010221919,0.00018103996,0.00003268869,0.00005862412,0.000034282886,0.00012933333],"category_scores_gemma":[0.000018006685,0.00009176951,0.00004442497,0.00017294101,0.000027927726,0.000146142,0.000014135576,0.000115986,0.0000036659048],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010792862,0.000026863932,0.0054479605,0.00007703688,0.00013952133,0.0000014950089,0.00073800597,0.548201,0.0054873563,0.21213877,0.008026326,0.21960771],"study_design_scores_gemma":[0.0005151065,0.00012554301,0.0014925683,0.0000099728795,0.000043236676,0.000031161035,0.00072392874,0.95451087,0.006197112,0.0036471754,0.032504007,0.00019931377],"about_ca_topic_score_codex":0.000018652927,"about_ca_topic_score_gemma":0.0000024767194,"teacher_disagreement_score":0.59352463,"about_ca_system_score_codex":0.0002581697,"about_ca_system_score_gemma":0.000016417192,"threshold_uncertainty_score":0.3742252},"labels":[],"label_agreement":null},{"id":"W4286789963","doi":"10.1061/(asce)co.1943-7862.0002343","title":"BIM Critical-Success Factors in the Design Phase and Risk Management: Exploring Knowledge and Maturity Mediating Effect","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Structural equation modeling; Maturity (psychological); Building information modeling; Critical success factor; Capability Maturity Model; Knowledge management; Path analysis (statistics); Process (computing); Process management; Sample (material); Phase (matter); Computer science; Engineering; Psychology; Operations management; Physics","score_opus":0.013489637352717493,"score_gpt":0.23430595284469022,"score_spread":0.22081631549197273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286789963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9235247,0.0022613402,0.07249708,0.00003360161,0.001161716,0.00020666645,0.000004674886,0.000050312607,0.00025992512],"genre_scores_gemma":[0.99186176,0.0036436254,0.004373765,0.0000036138554,0.000056985762,0.00004541241,8.608232e-7,0.000011619823,0.0000023707817],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923563,0.00009326549,0.00028334162,0.00010081445,0.00015691874,0.00013002304],"domain_scores_gemma":[0.9996233,0.00018665803,0.00005853422,0.00006593072,0.000016155822,0.00004942647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000685281,0.00013137577,0.00015693641,0.00034983802,0.00015729193,0.00007763017,0.00006980115,0.00002182521,0.000007460444],"category_scores_gemma":[0.000021929407,0.00010685983,0.000028097627,0.00020483873,0.000038739912,0.0002555866,0.000044994984,0.00032296442,1.1172413e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118490185,0.00009256143,0.010239693,0.0020943533,0.00062847626,0.00013239267,0.0042442833,0.09714302,0.00041609653,0.06323271,0.00016788304,0.82149005],"study_design_scores_gemma":[0.01844424,0.0020594036,0.09722891,0.0013375607,0.002527443,0.005470544,0.05683714,0.7497852,0.004325773,0.0075369338,0.05200719,0.0024396945],"about_ca_topic_score_codex":0.0000025752547,"about_ca_topic_score_gemma":6.086023e-7,"teacher_disagreement_score":0.8190504,"about_ca_system_score_codex":0.000045528825,"about_ca_system_score_gemma":0.0000023963214,"threshold_uncertainty_score":0.43576175},"labels":[],"label_agreement":null},{"id":"W4288820323","doi":"10.1007/978-3-662-53120-4_300375","title":"Life Cycle Cost Analysis","year":2019,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Life-cycle cost analysis; Computer science; Reliability engineering; Engineering","score_opus":0.008379556972199862,"score_gpt":0.1893258483321506,"score_spread":0.18094629135995074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288820323","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00001459779,0.00017843857,0.015990818,0.000025209798,0.00045419362,0.000074960335,0.000019640285,0.00023355761,0.98300856],"genre_scores_gemma":[0.021549428,0.0001365122,0.0001877049,0.00012084042,0.00015050064,0.000003917385,0.000093651535,0.00003369258,0.9777238],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99959123,0.0000011325117,0.00014488255,0.00010732127,0.00008934386,0.00006611418],"domain_scores_gemma":[0.9996842,0.000009587431,0.000021900289,0.00018996112,0.000031680196,0.00006263503],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000016634573,0.0001297878,0.0001946573,0.000188991,0.000012888682,0.00002456378,0.000054159234,0.00019889235,0.011682352],"category_scores_gemma":[0.0000024005844,0.0001199024,0.00016422459,0.000037332953,0.000012112598,0.00003787512,0.000006478737,0.00014783221,0.0017392132],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000020444847,0.0000014386956,0.00006822489,0.000031275697,0.0018786384,9.943521e-7,0.000016570257,0.02031997,0.000013655546,0.89701575,0.029140053,0.051511392],"study_design_scores_gemma":[0.00008339844,0.0000057577154,0.000084035455,0.000014899196,0.0006154309,0.0000019001255,0.000010599548,0.052018076,0.000031639254,0.002276293,0.9445321,0.0003258855],"about_ca_topic_score_codex":0.000008006824,"about_ca_topic_score_gemma":0.00007795411,"teacher_disagreement_score":0.91539204,"about_ca_system_score_codex":0.000033760465,"about_ca_system_score_gemma":0.00002378073,"threshold_uncertainty_score":0.99903804},"labels":[],"label_agreement":null},{"id":"W4290641841","doi":"","title":"21st IEEE International Conference on Computer Supported Cooperative Work in Design","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Work (physics); Computer science; Computer-supported cooperative work; Engineering management; Software engineering; Engineering; Mechanical engineering","score_opus":0.037650827578654754,"score_gpt":0.24877214861475094,"score_spread":0.21112132103609618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4290641841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04491228,0.00015089604,0.79598516,0.0036723558,0.0026288514,0.0006859973,0.00008433142,0.0004695206,0.15141062],"genre_scores_gemma":[0.96752375,0.00051586924,0.028203612,0.000045443063,0.000066319255,0.0001109431,0.0003594964,0.00003891978,0.0031356683],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99742085,0.0012084191,0.0004127655,0.00045885597,0.00028250593,0.00021662573],"domain_scores_gemma":[0.9971333,0.0003204161,0.00020857493,0.0010517131,0.0011967836,0.00008920405],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.001404796,0.00029666073,0.00029045012,0.0002282381,0.00015632914,0.0005538485,0.0009298492,0.00030038675,0.000330645],"category_scores_gemma":[0.0001656986,0.00031971952,0.00009042502,0.00013305448,0.0001621509,0.0001471355,0.00020934195,0.0008022053,0.00007745442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016601439,0.0012345226,0.0064279158,0.0002823985,0.00073240045,0.00004251612,0.023441022,0.0685403,0.006110593,0.37377626,0.021332653,0.4979134],"study_design_scores_gemma":[0.0013563927,0.000001488197,0.008762511,0.0061848364,0.00004330301,0.000015117267,0.00019434761,0.89980304,0.070593536,0.004948099,0.0069208676,0.0011764446],"about_ca_topic_score_codex":0.00014958056,"about_ca_topic_score_gemma":0.00054490933,"teacher_disagreement_score":0.9226115,"about_ca_system_score_codex":0.00018057278,"about_ca_system_score_gemma":0.00016235873,"threshold_uncertainty_score":0.9999255},"labels":[],"label_agreement":null},{"id":"W4290932114","doi":"10.1139/cjce-2021-0565","title":"Computational simulation as a decision-making support tool for prefabricated pillars production","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Production (economics); Productivity; Decision support system; Production line; Dashboard; Engineering; Computer science; Operations research; Construction engineering; Software engineering; Economics","score_opus":0.007431056533975132,"score_gpt":0.21341779301129032,"score_spread":0.2059867364773152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4290932114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16519456,0.00028905185,0.83014643,0.000096667136,0.0035085469,0.0002544473,0.0000330902,0.00008054556,0.00039665034],"genre_scores_gemma":[0.996907,0.0000018934458,0.002782505,0.000025706311,0.0002012346,0.000018295897,0.000012346973,0.000029217244,0.000021790638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991916,0.000008997511,0.0003511956,0.00008510025,0.00018754035,0.00017557679],"domain_scores_gemma":[0.99944675,0.00009739294,0.00007799717,0.000069800124,0.00019444842,0.00011358325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022627633,0.00009997402,0.00012476972,0.00045554296,0.00015885943,0.000045916277,0.00010106508,0.000034872326,0.00038238338],"category_scores_gemma":[0.00020983373,0.000118645425,0.000078577184,0.00028307826,0.00000955291,0.00022048889,0.0000047765893,0.00019790384,0.0000023483788],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010308791,0.0000022587394,0.00017496219,0.000016732447,0.00003288233,0.000006785364,0.00018349705,0.98706186,0.00014203052,0.00052545307,0.0016871036,0.010156133],"study_design_scores_gemma":[0.00025584284,0.000089875706,0.001087916,0.00005508792,0.000025478346,0.00046495209,0.000091537666,0.9546046,0.00006305445,0.0021117858,0.040969577,0.00018027863],"about_ca_topic_score_codex":0.000013229566,"about_ca_topic_score_gemma":0.000694143,"teacher_disagreement_score":0.8317124,"about_ca_system_score_codex":0.00041316554,"about_ca_system_score_gemma":0.00032295997,"threshold_uncertainty_score":0.48382202},"labels":[],"label_agreement":null},{"id":"W4292176249","doi":"10.56748/ejse.331","title":"Qualitative &amp; Semi-Quantitative Reasoning Techniques for Engineering Projects at Conceptual Stage","year":2003,"lang":"en","type":"article","venue":"Electronic Journal of Structural Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Coquitlam College","funders":"","keywords":"Qualitative reasoning; Computer science; Abstraction; Management science; Artificial intelligence; Engineering; Epistemology","score_opus":0.01707063865030917,"score_gpt":0.2833095035985923,"score_spread":0.26623886494828314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292176249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6082649,0.003377969,0.3868799,0.000012787167,0.00067860703,0.00029482544,0.000017011696,0.0002442451,0.000229731],"genre_scores_gemma":[0.956414,0.000068725945,0.043136563,0.000005737829,0.00013566476,0.000026991085,0.000008134636,0.000064906686,0.000139276],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99844074,0.0000338805,0.0005431638,0.0001554471,0.00022572493,0.00060104433],"domain_scores_gemma":[0.9991917,0.00020833909,0.00017222445,0.00011341527,0.00021934643,0.00009498939],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00045213863,0.0003006669,0.0003665533,0.00025625635,0.00007896099,0.000040593375,0.00014193216,0.00012492212,0.000040559495],"category_scores_gemma":[0.00034529134,0.00028133305,0.00016859926,0.00025839361,0.00004093502,0.00041566047,0.000010478907,0.00058924535,0.0000016858269],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093415794,0.0000062417935,0.000049703198,0.00022907865,0.000548372,0.0000050791828,0.011012354,0.17008898,0.16799442,0.6479951,0.00020988093,0.0017673399],"study_design_scores_gemma":[0.0034544438,0.0015078607,0.00014306807,0.0008631122,0.0002582267,0.0020069578,0.014576806,0.18546231,0.6581849,0.0031839148,0.1278908,0.0024676416],"about_ca_topic_score_codex":0.0000027746787,"about_ca_topic_score_gemma":0.000009517257,"teacher_disagreement_score":0.6448112,"about_ca_system_score_codex":0.00073992845,"about_ca_system_score_gemma":0.0001110443,"threshold_uncertainty_score":0.9999639},"labels":[],"label_agreement":null},{"id":"W4292315412","doi":"10.1061/9780784416051","title":"Anchorage Design for Petrochemical and Other Industrial Facilities","year":2022,"lang":"en","type":"book","venue":"American Society of Civil Engineers eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dow Chemical (Canada)","funders":"","keywords":"Petrochemical; Engineering; Code (set theory); Manufacturing engineering; Construction engineering; Systems engineering; Computer science; Waste management; Set (abstract data type); Programming language","score_opus":0.02268913325100241,"score_gpt":0.20626030688705646,"score_spread":0.18357117363605405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292315412","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015234317,0.003055878,0.46555302,0.00007369828,0.0019117452,0.0024601058,0.0030638364,0.0014614677,0.52089685],"genre_scores_gemma":[0.057112966,0.00052387384,0.030969726,0.000653652,0.0026754069,0.0014862122,0.00044399477,0.0007743478,0.9053598],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904656,0.000014468119,0.0002922983,0.00021812353,0.0002088332,0.00021969568],"domain_scores_gemma":[0.99943244,0.00018309243,0.00010726124,0.00016936794,0.000038797094,0.00006906442],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011863547,0.0002983705,0.00046479906,0.00006496293,0.00005578603,0.00001728707,0.00012485763,0.00021775073,0.00011353248],"category_scores_gemma":[0.00000980603,0.00033854845,0.0002888248,0.000039730367,0.00042066534,0.000024953077,0.000023512392,0.0004801143,6.2423595e-7],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063723295,0.000010429965,0.000010053387,0.00063573493,0.0010404539,5.3142895e-7,0.0042419783,0.0043970584,0.0023486875,0.0040527824,0.9209204,0.06227817],"study_design_scores_gemma":[0.0004761797,0.000159546,4.146008e-7,0.00004979566,0.00008838127,0.0000070812725,0.0024776491,0.0063602333,0.00082268496,0.0007030598,0.98842764,0.00042731635],"about_ca_topic_score_codex":0.000013908512,"about_ca_topic_score_gemma":0.0000032822877,"teacher_disagreement_score":0.43458328,"about_ca_system_score_codex":0.00018910314,"about_ca_system_score_gemma":0.00013941189,"threshold_uncertainty_score":0.99990666},"labels":[],"label_agreement":null},{"id":"W4292830129","doi":"10.23919/annsim55834.2022.9859473","title":"Software Architecture For Integrating Devs Simulation Into BIM","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"DEVS; HVAC; Building information modeling; Building science; Computer science; Efficient energy use; Systems engineering; Discrete event simulation; Architecture; Building management system; Building automation; Building design; Architectural engineering; Software; Modeling and simulation; Simulation; Engineering; Artificial intelligence","score_opus":0.00805261867266238,"score_gpt":0.22437754497841528,"score_spread":0.2163249263057529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292830129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020527927,0.000055529577,0.97706944,0.00006969337,0.0004747279,0.00015562226,0.00000927473,0.00045527858,0.0011825319],"genre_scores_gemma":[0.9420507,5.0275185e-7,0.057391804,0.00008668496,0.00008158918,0.00013847454,0.000046099478,0.000017065973,0.00018708718],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961185,0.000010351227,0.00012280156,0.00008671269,0.00008095146,0.000087307155],"domain_scores_gemma":[0.99978554,0.000074280964,0.000015030147,0.00007391068,0.000030944793,0.000020297624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005532647,0.00007215019,0.00005945387,0.0000762341,0.00018511474,0.000022599785,0.000057215067,0.000026702555,0.0003598377],"category_scores_gemma":[0.000034190805,0.00006714113,0.000043864264,0.0001271212,0.000007910136,0.0000581279,0.000014852591,0.00013347219,0.0000037598375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005293238,0.000002373011,0.00008680813,0.000015073142,0.000007920785,9.057041e-8,0.0002980519,0.7330304,0.00059870654,0.006406062,0.00043358412,0.25911564],"study_design_scores_gemma":[0.00025435007,0.000059458638,0.000061945124,0.0000059897648,0.0000097025,0.000008092403,0.0012466165,0.88287526,0.0018236926,0.026666528,0.08679824,0.00019012328],"about_ca_topic_score_codex":0.000015225029,"about_ca_topic_score_gemma":0.00007754797,"teacher_disagreement_score":0.92152274,"about_ca_system_score_codex":0.000071301976,"about_ca_system_score_gemma":0.000011698194,"threshold_uncertainty_score":0.39399704},"labels":[],"label_agreement":null},{"id":"W4293069123","doi":"10.1007/978-981-19-1029-6_15","title":"Technology-Oriented Innovation in Construction: A Conceptual Mapping Framework","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Benchmarking; Maturity (psychological); Conceptual framework; Capability Maturity Model; Context (archaeology); Process management; Quality (philosophy); Conceptual model; The Conceptual Framework; Knowledge management; Engineering; Business; Computer science; Marketing; Geography; Political science","score_opus":0.008058545192238387,"score_gpt":0.1920477730640888,"score_spread":0.1839892278718504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069123","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032076356,0.003730141,0.93825066,0.0002416594,0.005057105,0.00059640245,0.00004683092,0.0015699985,0.047299594],"genre_scores_gemma":[0.96685976,0.0003395492,0.030769542,0.00010009581,0.00068029016,0.0002650903,0.00021364147,0.00028781698,0.00048424522],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983739,0.000006932448,0.0007038307,0.000367035,0.00023298505,0.00031530828],"domain_scores_gemma":[0.9993749,0.00013291513,0.000102291146,0.0002983469,0.00006476999,0.000026773345],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012038402,0.00043462365,0.0004319489,0.0022484995,0.00004675885,0.00002398555,0.00016564662,0.0009210302,0.0010928663],"category_scores_gemma":[0.00020254502,0.00054384,0.00006390494,0.0012074686,0.000098385084,0.00011939937,0.000054000033,0.0025467766,0.000009758831],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050705967,0.000004016547,0.0003177679,0.00010139935,0.000049765404,0.00002663792,0.00044588087,0.38878947,0.0004676269,0.57880193,0.000018285207,0.03097214],"study_design_scores_gemma":[0.0016628285,0.0001266451,0.0002174746,0.0041927164,0.000063338615,0.0005404759,0.00034737124,0.15365645,0.0023088993,0.2112298,0.62222505,0.0034289355],"about_ca_topic_score_codex":0.000005557257,"about_ca_topic_score_gemma":0.000107212145,"teacher_disagreement_score":0.9636521,"about_ca_system_score_codex":0.0006067172,"about_ca_system_score_gemma":0.000048126552,"threshold_uncertainty_score":0.9998203},"labels":[],"label_agreement":null},{"id":"W4293069240","doi":"10.1007/978-981-19-1029-6_49","title":"Integrating Building Information Modeling and Virtual Reality to Facilitate the Implementation of Universal Design for Facilities at the Conceptual Stage","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Conceptual design; Usability; Universal design; Systems engineering; Process (computing); Engineering design process; Conceptual model; Engineering; Architectural engineering; Architecture; Virtual reality; Computer science; Design technology; Design for All; Human–computer interaction; World Wide Web; Operations management","score_opus":0.027643055800191763,"score_gpt":0.22912736903327988,"score_spread":0.2014843132330881,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069240","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044789985,0.00027195647,0.9927868,0.00007302111,0.00030243502,0.00069155346,0.00048127104,0.00008579698,0.0008281325],"genre_scores_gemma":[0.9970378,0.00007240939,0.002189792,0.000028230423,0.000057347446,0.00012416978,0.00012055306,0.00003699461,0.0003326869],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990331,0.000020296377,0.0004296086,0.00014571329,0.00019146451,0.00017984558],"domain_scores_gemma":[0.99917895,0.00049227575,0.00007568328,0.00016261668,0.00006319666,0.000027277381],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035248874,0.00025156594,0.00021795518,0.00017244149,0.00013497002,0.00003997176,0.00012956974,0.000119853816,0.00014318472],"category_scores_gemma":[0.00008771909,0.00019706147,0.00006744732,0.00007121715,0.000048456954,0.00022776287,0.000066273744,0.00039816668,5.079919e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016485186,3.3903478e-7,0.0000022032118,0.0000834814,0.000036175345,1.3174812e-7,0.008418463,0.9404305,0.0006543277,0.036675233,0.0000220023,0.013660618],"study_design_scores_gemma":[0.00030858518,0.00009637899,0.0000036233644,0.00010129318,0.000033371456,0.000005155532,0.0035473884,0.9682149,0.0015135056,0.0014046873,0.024450507,0.0003205617],"about_ca_topic_score_codex":0.00026619688,"about_ca_topic_score_gemma":0.0017639312,"teacher_disagreement_score":0.99255884,"about_ca_system_score_codex":0.00036101448,"about_ca_system_score_gemma":0.000035339555,"threshold_uncertainty_score":0.80359334},"labels":[],"label_agreement":null},{"id":"W4293069250","doi":"10.1007/978-981-19-1029-6_36","title":"A Case Study of the Impact of Modular Manufacturing on a Hospital Expansion Project","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Building information modeling; Modular design; Productivity; Process management; Product (mathematics); Knowledge management; Stakeholder; Information sharing; Business; Engineering; Operations management; Computer science","score_opus":0.009434570756719324,"score_gpt":0.21384386882647194,"score_spread":0.2044092980697526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99114746,0.00033058703,0.0033418566,0.0000039650527,0.00089149503,0.0010150006,0.00004639388,0.00014222383,0.0030810211],"genre_scores_gemma":[0.99963254,0.00002094852,0.0000619495,0.0000013009,0.00008686061,0.00004666774,0.0000055712976,0.00009297248,0.000051192386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99888974,0.000013687886,0.00040577908,0.0002351167,0.00028004436,0.00017563305],"domain_scores_gemma":[0.99930215,0.00009590577,0.000110032015,0.00044344383,0.000025743126,0.000022754226],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000075730175,0.00038162246,0.0004081672,0.00040861248,0.000035497997,0.000010762944,0.0001753372,0.00020704407,0.000120508594],"category_scores_gemma":[0.000030088959,0.00029419555,0.00024175095,0.00010821787,0.000017562508,0.000054570082,0.00006142773,0.00089778745,4.0680243e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000088609495,0.000038727932,0.00006696201,0.00013443339,0.00014493395,0.00013454445,0.0018493397,0.9916366,0.0006005991,0.0001111936,0.0000056109157,0.0052682427],"study_design_scores_gemma":[0.006538313,0.007644701,0.0037925462,0.005314336,0.0008133622,0.0052212747,0.0012512368,0.8919134,0.06648133,0.0032920185,0.0019770686,0.005760395],"about_ca_topic_score_codex":0.00040567183,"about_ca_topic_score_gemma":0.00036062062,"teacher_disagreement_score":0.09972314,"about_ca_system_score_codex":0.0002990644,"about_ca_system_score_gemma":0.00003732699,"threshold_uncertainty_score":0.999951},"labels":[],"label_agreement":null},{"id":"W4293069260","doi":"10.1007/978-981-19-1029-6_34","title":"A Framework to Evaluate School Infrastructure Project Need Using Fuzzy Expert System","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of Alberta; University of Alberta","funders":"","keywords":"Process (computing); Context (archaeology); Work (physics); Domain (mathematical analysis); Investment (military); Engineering management; Prioritization; Process management; Computer science; Engineering; Management science; Knowledge management; Geography; Political science","score_opus":0.013833093759593393,"score_gpt":0.23820924424130474,"score_spread":0.22437615048171133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069260","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016375317,0.00709139,0.9138306,0.000089260386,0.009636925,0.0021022342,0.0001280433,0.002690825,0.06279323],"genre_scores_gemma":[0.91662717,0.0003036855,0.07603464,0.0003484218,0.003951813,0.00061284075,0.00014431766,0.0011583937,0.0008187111],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99775714,0.000021381506,0.00062238204,0.0005497866,0.00053244835,0.00051688903],"domain_scores_gemma":[0.9989634,0.00014825839,0.0000875239,0.000572632,0.00007534608,0.0001528318],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001683808,0.0007992692,0.0006860222,0.0010589146,0.00009633695,0.00011415887,0.0003423023,0.0008529327,0.00081040355],"category_scores_gemma":[0.0001836764,0.000860845,0.0002028608,0.0004096661,0.000018523326,0.00014479471,0.000110065645,0.0022681372,0.00002399893],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014754103,0.000001910674,0.000014250775,0.00037689955,0.0001153502,0.000028795126,0.00054649543,0.9815983,0.0017555555,0.008879969,0.00018160924,0.0064860843],"study_design_scores_gemma":[0.0007727489,0.00013782596,0.00005105246,0.0061258576,0.00020497445,0.00048084717,0.00012438417,0.82277936,0.0012703526,0.00699985,0.15759455,0.003458195],"about_ca_topic_score_codex":0.00005817734,"about_ca_topic_score_gemma":0.00009363321,"teacher_disagreement_score":0.91498965,"about_ca_system_score_codex":0.0018475925,"about_ca_system_score_gemma":0.00014586258,"threshold_uncertainty_score":0.9993842},"labels":[],"label_agreement":null},{"id":"W4293069264","doi":"10.1007/978-981-19-1029-6_33","title":"Evaluation of the Return on Investment of BIM—The Case of an Architectural Firm","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Benchmarking; Return on investment; Process management; Workflow; Process (computing); Investment (military); Performance indicator; Productivity; Computer science; Systems engineering; Operations management; Business; Engineering; Production (economics); Database; Scheduling (production processes); Marketing","score_opus":0.01558051746200722,"score_gpt":0.22072154819827763,"score_spread":0.2051410307362704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84927636,0.012023203,0.031836268,0.00041272969,0.008888416,0.004454325,0.0005567195,0.00043793488,0.092114024],"genre_scores_gemma":[0.99952954,0.0000131944935,0.00023871126,0.000016458729,0.000079024365,0.000031545147,0.000013887321,0.000045699308,0.00003194514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988515,0.00004370403,0.00040488224,0.0001498073,0.00043897366,0.00011116105],"domain_scores_gemma":[0.99913204,0.00017765435,0.00014003967,0.00043970463,0.00009009168,0.00002047513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041581097,0.00022987115,0.00025940695,0.0002188046,0.000027770753,0.000005208955,0.00018837377,0.00016469196,0.00024375583],"category_scores_gemma":[0.00013591426,0.00016178108,0.00012783422,0.0001287307,0.000054834032,0.000032179865,0.00003377884,0.00064933754,2.3148874e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005870884,0.0000052854148,0.000004617644,0.00012893557,0.00006779096,0.0000036037277,0.0005106485,0.9515403,0.001765193,0.008709617,0.0000033101492,0.037254848],"study_design_scores_gemma":[0.00054754363,0.00019703526,0.00020391897,0.0007527726,0.00033624948,0.00050997565,0.000027938198,0.9318152,0.04065939,0.023095058,0.0014151874,0.00043972986],"about_ca_topic_score_codex":0.00007172776,"about_ca_topic_score_gemma":0.0014258967,"teacher_disagreement_score":0.15025316,"about_ca_system_score_codex":0.00019986098,"about_ca_system_score_gemma":0.00005156259,"threshold_uncertainty_score":0.65972406},"labels":[],"label_agreement":null},{"id":"W4293069330","doi":"10.1007/978-981-19-1029-6_17","title":"Towards Construction’s Digital Future: A Roadmap for Enhancing Data Value","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Big data; Raw data; Computer science; Data science; Bridging (networking); Digital data; Process management; Knowledge management; Engineering; Data mining","score_opus":0.010316268770082212,"score_gpt":0.2035371152508214,"score_spread":0.1932208464807392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069330","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000033562224,0.0045331134,0.94436055,0.00014968065,0.0077712326,0.0005880126,0.0009899329,0.0008525137,0.040721383],"genre_scores_gemma":[0.8400727,0.0033756797,0.10858734,0.00040651183,0.02452422,0.0011586304,0.013220204,0.0026671023,0.005987628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99825597,0.0000045143247,0.00053148926,0.0005466867,0.0002925546,0.00036876218],"domain_scores_gemma":[0.99892914,0.00016196753,0.000080091275,0.0007026691,0.00004691267,0.000079219026],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013498981,0.00055107276,0.00048677518,0.00040266354,0.000078989106,0.00013459621,0.0004641646,0.00047723792,0.00059720874],"category_scores_gemma":[0.00011573778,0.000627144,0.00015834806,0.00012493685,0.000032481817,0.00038093832,0.00014413033,0.0010627079,0.000008325784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019692308,0.0000075104945,0.000011482718,0.0006584411,0.00029982906,0.000017230195,0.00025281013,0.6337829,0.00041996894,0.093118094,0.0004961433,0.2709159],"study_design_scores_gemma":[0.0005297651,0.000051929088,0.000007661658,0.00034915886,0.000104456696,0.00023367094,0.00002123564,0.2265231,0.0007149362,0.013696107,0.7565129,0.0012550942],"about_ca_topic_score_codex":0.0000089182,"about_ca_topic_score_gemma":0.00044376985,"teacher_disagreement_score":0.84003913,"about_ca_system_score_codex":0.0004400116,"about_ca_system_score_gemma":0.00009605123,"threshold_uncertainty_score":0.999618},"labels":[],"label_agreement":null},{"id":"W4293074059","doi":"10.11159/iccste22","title":"Proceedings of the 7th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'22)","year":2022,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Karadeniz Teknik Üniversitesi","keywords":"Engineering; Construction engineering; Computer science; Engineering ethics","score_opus":0.013244340646576154,"score_gpt":0.21587289094867743,"score_spread":0.20262855030210128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293074059","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97888434,0.00017807011,0.00009133448,0.0005486488,0.005920222,0.0008018153,0.0014534661,0.00014392921,0.011978156],"genre_scores_gemma":[0.99765986,0.000431647,0.00019885582,0.000032151645,0.00023965226,0.00012651905,0.0002345421,0.00007241173,0.0010043359],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972714,0.000004223657,0.0008978915,0.00053313747,0.0009916225,0.00030169278],"domain_scores_gemma":[0.9985839,0.000043406337,0.00052297785,0.00011582323,0.000635798,0.00009806443],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012096195,0.0006303932,0.00051823934,0.000377226,0.000158705,0.0001849808,0.0008302815,0.00027164217,0.0012218916],"category_scores_gemma":[0.000031993066,0.00049248285,0.00022270875,0.00033343025,0.00014007807,0.00054774166,0.000034899436,0.000991262,0.0000026473324],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000509828,0.000054118736,0.007473362,0.0036375995,0.0016666029,0.0000024525277,0.005178121,0.08817986,0.1919468,0.6916143,0.0039451323,0.0057918564],"study_design_scores_gemma":[0.0050235954,0.00067128794,0.25809816,0.0077751996,0.00089457136,0.00016871496,0.0046420093,0.58363485,0.11041904,0.0075482656,0.016845075,0.004279252],"about_ca_topic_score_codex":0.00005409536,"about_ca_topic_score_gemma":0.00006394971,"teacher_disagreement_score":0.684066,"about_ca_system_score_codex":0.0001594395,"about_ca_system_score_gemma":0.000058383175,"threshold_uncertainty_score":0.9997527},"labels":[],"label_agreement":null},{"id":"W4293103574","doi":"10.3390/buildings12091303","title":"Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; George Brown College","funders":"","keywords":"Formwork; Rebar; Engineering; Construction industry; Reinforced concrete; Hazard; Structural engineering; Construction engineering; Forensic engineering; Civil engineering","score_opus":0.004703633444355788,"score_gpt":0.19318805044179685,"score_spread":0.18848441699744106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293103574","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99037534,0.00059933844,0.0056854445,0.000040273877,0.0005431085,0.0001109154,9.351385e-7,0.00020344275,0.0024412114],"genre_scores_gemma":[0.99315846,0.000053093197,0.00658078,0.000036695707,0.000059384216,0.000050592545,0.0000030680962,0.000019390753,0.000038558097],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992985,0.0000147944675,0.00023463328,0.00016214105,0.00013196874,0.00015795874],"domain_scores_gemma":[0.99978197,0.000022010718,0.00004372777,0.00009012354,0.000017341745,0.00004482665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009454796,0.0001186145,0.00012685194,0.00027707868,0.00021131324,0.000044550463,0.000076287564,0.000048191774,0.00005755978],"category_scores_gemma":[0.00001533348,0.00013743024,0.000027298354,0.00025385775,0.000045148623,0.00029493828,0.00006398686,0.00027279387,0.0000015814903],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047240854,0.0000038046746,0.013721685,0.00018607816,0.00005618735,0.000024840449,0.006041883,0.022970574,0.33725205,0.4079012,0.00067720574,0.21111724],"study_design_scores_gemma":[0.0042663547,0.00036040694,0.004734987,0.00034606596,0.000070422204,0.0012205482,0.012264945,0.35940662,0.18616714,0.051380094,0.37768388,0.0020985466],"about_ca_topic_score_codex":0.00011657717,"about_ca_topic_score_gemma":0.000013552735,"teacher_disagreement_score":0.37700668,"about_ca_system_score_codex":0.00019356476,"about_ca_system_score_gemma":0.000016445289,"threshold_uncertainty_score":0.5604242},"labels":[],"label_agreement":null},{"id":"W4293108473","doi":"10.5383/juspn.16.02.003","title":"Design and Study of a Digital Energy Building: Case of Morocco","year":2022,"lang":"en","type":"article","venue":"Journal of Ubiquitous Systems and Pervasive Networks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Industrial Revolution; Urbanization; Energy consumption; Work (physics); Consumption (sociology); Architectural engineering; Globalization; Quality (philosophy); Digital Revolution; Business; Production (economics); Energy (signal processing); Environmental economics; Operations management; Computer science; Economic growth; Engineering; Economics; Political science; Mechanical engineering; Telecommunications; Sociology; Market economy","score_opus":0.012304327759315257,"score_gpt":0.2095279771306033,"score_spread":0.19722364937128806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293108473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94295853,0.0050373357,0.051185746,0.0000044005355,0.00060850533,0.00011187958,0.000005371802,0.000007779084,0.00008047671],"genre_scores_gemma":[0.9995619,0.0001562145,0.000074887714,0.0000025723432,0.00016849913,0.000007985008,3.9230358e-7,0.000011685734,0.000015874508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915445,0.000075924014,0.00047423423,0.000066992376,0.00014142865,0.00008695493],"domain_scores_gemma":[0.9993851,0.00009496856,0.0002650444,0.000067118635,0.00013399096,0.00005375702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021464421,0.000093276656,0.00029075195,0.00011193725,0.000077530116,0.000036600337,0.000054866174,0.000036799378,0.000004897],"category_scores_gemma":[0.000005685079,0.00008027599,0.000040957715,0.00011410329,0.000024285499,0.00012416208,0.000027555427,0.00015883934,1.0359063e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010425272,0.000091774884,0.0020472293,0.00008570849,0.00028400417,0.0003503026,0.0020769502,0.9759795,0.0009217578,0.0007922925,0.0005311787,0.01673503],"study_design_scores_gemma":[0.0034855083,0.006492944,0.00061566033,0.00032393305,0.00038035557,0.07188801,0.06901771,0.8438973,0.0004598553,0.00033060368,0.0026061966,0.0005019711],"about_ca_topic_score_codex":0.00010476638,"about_ca_topic_score_gemma":0.000010956606,"teacher_disagreement_score":0.13208227,"about_ca_system_score_codex":0.000026702162,"about_ca_system_score_gemma":0.00001834895,"threshold_uncertainty_score":0.32735598},"labels":[],"label_agreement":null},{"id":"W4293169025","doi":"10.3390/su141610455","title":"Use of KROQI as a Level-2 Common Data Environment in the French Construction Industry","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Variety (cybernetics); Work (physics); Plan (archaeology); Government (linguistics); Construction industry; Computer science; Knowledge management; Business; Process management; Engineering; Construction engineering; Artificial intelligence","score_opus":0.038944876362880396,"score_gpt":0.25142612384866186,"score_spread":0.21248124748578145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293169025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9979254,0.000053581265,0.00056557625,0.00052023033,0.00016386971,0.00030320862,0.00012687915,0.00003271604,0.00030855156],"genre_scores_gemma":[0.9995915,0.0000054284997,0.00018610522,0.00002637591,0.00001613787,0.000063765896,0.000062408246,0.0000055978744,0.000042626973],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9991096,0.00017817304,0.0002366285,0.00015777716,0.00019793137,0.00011985471],"domain_scores_gemma":[0.99917454,0.00007567963,0.000038529088,0.0006635345,0.000030313115,0.000017387101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041821555,0.000077643934,0.000101694204,0.000058460828,0.00008519232,0.000017412896,0.00025835834,0.000071849485,0.00032918074],"category_scores_gemma":[0.00009567524,0.000069050264,0.000022424827,0.00020169606,0.00013200466,0.00019755501,0.00013612071,0.0005341865,0.000001076326],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060204435,0.0003458384,0.48641363,0.00027820084,0.00006194403,0.000020451484,0.0046500186,0.0978778,0.00024047888,0.034929868,0.0047268653,0.3703947],"study_design_scores_gemma":[0.0009204286,0.00025392667,0.63326734,0.000016696913,0.00006792337,0.00022693214,0.06550539,0.04452306,0.00093877857,0.095232755,0.15844958,0.00059719256],"about_ca_topic_score_codex":0.0012975718,"about_ca_topic_score_gemma":0.00013994727,"teacher_disagreement_score":0.36979753,"about_ca_system_score_codex":0.00047085443,"about_ca_system_score_gemma":0.00009257331,"threshold_uncertainty_score":0.36042982},"labels":[],"label_agreement":null},{"id":"W4293222198","doi":"10.1016/j.jcsr.2022.107464","title":"Structural performance of registration pin connection in VectorBloc modular construction system","year":2022,"lang":"en","type":"article","venue":"Journal of Constructional Steel Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Connection (principal bundle); Structural engineering; Modular construction; Computer science; Engineering; Engineering drawing; Programming language","score_opus":0.029506473824582824,"score_gpt":0.27273287649939837,"score_spread":0.24322640267481554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293222198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944074,0.00037407628,0.00042664603,0.000059481525,0.002387824,0.00018453028,0.000020767011,0.00003217445,0.0021070905],"genre_scores_gemma":[0.99865437,0.000060641676,0.00093309075,0.0000021698684,0.00026885993,0.000021733162,0.000008837381,0.000016557095,0.000033754593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9970386,0.0003064934,0.00095548324,0.00014902843,0.0013016971,0.00024871313],"domain_scores_gemma":[0.9985535,0.00012703621,0.0003170861,0.000147274,0.0007805855,0.000074529635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001450555,0.00013393501,0.00029393323,0.0010222016,0.00028915447,0.00003786259,0.00020826358,0.000090977854,0.00024217651],"category_scores_gemma":[0.000066296365,0.00013872629,0.00010645308,0.0009571698,0.00029274632,0.00046532688,0.0000353235,0.001049961,0.0000021380044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014087897,0.00007515792,0.07648713,0.00073455746,0.00027626715,0.00004313337,0.00051493506,0.5628403,0.10148517,0.18010788,0.0007553528,0.07527133],"study_design_scores_gemma":[0.007820273,0.0030406227,0.18747959,0.0008354171,0.00010095476,0.03497691,0.037554234,0.6570541,0.05487112,0.0068683396,0.008288128,0.0011103008],"about_ca_topic_score_codex":0.00003695466,"about_ca_topic_score_gemma":0.000014349538,"teacher_disagreement_score":0.17323954,"about_ca_system_score_codex":0.00093201816,"about_ca_system_score_gemma":0.00032129028,"threshold_uncertainty_score":0.56570935},"labels":[],"label_agreement":null},{"id":"W4293272017","doi":"10.1108/ci-08-2017-0070","title":"Innovation transfer in construction: re-interpreting factor-based research from the perspective of the social construction of technology (SCOT)","year":2022,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Roads University","funders":"","keywords":"Context (archaeology); Knowledge management; Technological change; Set (abstract data type); Process (computing); Empirical research; Perspective (graphical); Management science; Business; Computer science; Engineering; Epistemology","score_opus":0.03774916421237179,"score_gpt":0.29467117066990417,"score_spread":0.2569220064575324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293272017","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9775018,0.00007058264,0.014755189,0.0023846326,0.002363337,0.0005571506,0.00016650562,0.00013504861,0.002065756],"genre_scores_gemma":[0.9979859,0.0000054385955,0.0016105394,0.000045315282,0.00013800249,0.00013599162,0.000046158846,0.000025021045,0.000007634131],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99733925,0.00031511876,0.0011374273,0.00032129735,0.0006453007,0.00024161073],"domain_scores_gemma":[0.9976102,0.00019078562,0.00031468045,0.00034481677,0.0015292695,0.000010258844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007089244,0.00019702173,0.0002802798,0.0015400291,0.0006487709,0.000032626678,0.00033211763,0.00022745889,0.00048089726],"category_scores_gemma":[0.0002793758,0.0001726672,0.00008151284,0.010830037,0.0014199591,0.00024430576,0.00006584699,0.0011950088,0.0000011685429],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012944335,0.000035220215,0.045738507,0.000032624856,0.00007258079,3.4218004e-7,0.0022519508,0.0020113315,0.07835493,0.82425225,0.00019085927,0.04692997],"study_design_scores_gemma":[0.0042260312,0.0002944993,0.04142082,0.0004032733,0.00008936088,0.00018132516,0.2497259,0.01724711,0.48067892,0.19991373,0.004907246,0.0009117952],"about_ca_topic_score_codex":0.00017346682,"about_ca_topic_score_gemma":0.00006402768,"teacher_disagreement_score":0.6243385,"about_ca_system_score_codex":0.0006727204,"about_ca_system_score_gemma":0.0003027129,"threshold_uncertainty_score":0.70411646},"labels":[],"label_agreement":null},{"id":"W4293566659","doi":"10.1108/sasbe-03-2022-0050","title":"Industry 4.0 and the circular economy: using design-stage digital technology to reduce construction waste","year":2022,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Reuse; Circular economy; Originality; Big data; Analytics; Design technology; Engineering; Computer science; Engineering management; Manufacturing engineering; Systems engineering; Data science; Waste management","score_opus":0.007369698120115759,"score_gpt":0.18879370697762007,"score_spread":0.18142400885750432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293566659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96349555,0.0007454361,0.033279315,0.00075401744,0.0001293229,0.00047258474,0.0000062056956,0.000069285656,0.0010482759],"genre_scores_gemma":[0.9983647,0.000033369386,0.0005453198,0.00005079348,0.00003170257,0.00012552939,0.000002908973,0.000015419544,0.0008302407],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993507,0.000030002802,0.00014411965,0.00017574964,0.0000708464,0.00022854669],"domain_scores_gemma":[0.99974394,0.000015053863,0.000026391896,0.00015563681,0.0000073292563,0.000051638664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001780107,0.000114898554,0.00011732902,0.00012422896,0.00039792596,0.00008261317,0.00006569737,0.000111270776,0.00008457987],"category_scores_gemma":[0.0000072143275,0.00010520466,0.000019744026,0.00011786447,0.0002002384,0.00015106368,0.00015922931,0.0003666291,0.0000016070247],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002867528,0.00006272104,0.01565709,0.0002632168,0.0003202902,0.0000902572,0.002124283,0.7128401,0.006705751,0.16035704,0.000833661,0.10045883],"study_design_scores_gemma":[0.0037642778,0.00029233,0.0005457549,0.000020692756,0.00013674243,0.0010261539,0.17978336,0.13254698,0.010032781,0.042084575,0.62867683,0.0010895439],"about_ca_topic_score_codex":0.000019619903,"about_ca_topic_score_gemma":2.2468501e-7,"teacher_disagreement_score":0.62784314,"about_ca_system_score_codex":0.00023492599,"about_ca_system_score_gemma":0.000023980167,"threshold_uncertainty_score":0.42901212},"labels":[],"label_agreement":null},{"id":"W4293762666","doi":"10.24928/2022/0213","title":"Framework for Using LPS in Design on IPD Projects","year":2022,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science","score_opus":0.05839863043142912,"score_gpt":0.2703512992626354,"score_spread":0.21195266883120628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293762666","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35084662,0.00001538075,0.642999,0.00028833127,0.0042830985,0.0007805892,0.0002448589,0.00005763669,0.00048448166],"genre_scores_gemma":[0.97118527,0.0000023571176,0.028366555,0.00005070856,0.000115432544,0.00020133606,0.00002010662,0.000015472353,0.00004276417],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922633,0.00002800644,0.00025913524,0.00015222962,0.00021314436,0.000121140234],"domain_scores_gemma":[0.9994245,0.00014529709,0.00011264849,0.000116645635,0.00018559812,0.000015319225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020313087,0.00010513522,0.000112350885,0.00015822478,0.00012496496,0.000028576278,0.00026551186,0.00005689027,0.000060630122],"category_scores_gemma":[0.000110949055,0.000097911354,0.00009003574,0.0001447048,0.00007112154,0.00016121204,0.00003382257,0.00019268197,5.086334e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028419768,0.000034157023,0.000590094,0.000029004454,0.00005725427,1.9747337e-7,0.00058187096,0.046249263,0.0033606798,0.91626215,0.00027308948,0.032278027],"study_design_scores_gemma":[0.0016434793,0.00051251036,0.00064337003,0.00024157242,0.0000465337,0.00010394729,0.010462669,0.55185276,0.030518435,0.39746377,0.006053129,0.00045783288],"about_ca_topic_score_codex":0.000020053389,"about_ca_topic_score_gemma":0.00001446003,"teacher_disagreement_score":0.6203386,"about_ca_system_score_codex":0.0001991158,"about_ca_system_score_gemma":0.000061985076,"threshold_uncertainty_score":0.39927092},"labels":[],"label_agreement":null},{"id":"W4293762779","doi":"10.24928/2022/0112","title":"Assembly Process in Off-Site Construction: Self-Lock Device as a Key to a Lean Approach","year":2022,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Université Laval","funders":"","keywords":"Modular design; Timeline; Lock (firearm); Process (computing); Key (lock); Computer science; Plug and play; Engineering; Systems engineering; Manufacturing engineering; Mechanical engineering; Operating system","score_opus":0.013190068605602482,"score_gpt":0.23380815697481883,"score_spread":0.22061808836921634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293762779","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9791278,0.000034293473,0.008641639,0.0004958796,0.0027482966,0.0006862035,0.0002661514,0.00017611233,0.007823593],"genre_scores_gemma":[0.9935687,0.000009002511,0.005542739,0.0001266928,0.00015247473,0.00032582704,0.00007046719,0.00002671618,0.00017739106],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983681,0.000037930185,0.0005190103,0.00033487703,0.00051478815,0.00022529924],"domain_scores_gemma":[0.99896646,0.000051818824,0.00018408238,0.00021972568,0.0005145856,0.00006331921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025921062,0.00021525934,0.00022926008,0.00032079392,0.00020055955,0.00007008272,0.0005434859,0.000085743006,0.00014000513],"category_scores_gemma":[0.00007220144,0.0002116802,0.00013116866,0.00051012484,0.00010990475,0.00041522775,0.00011227528,0.0003589425,0.000008353862],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090789545,0.0003815506,0.029589737,0.0003805773,0.0005997872,0.0000041021945,0.016090948,0.077015385,0.011560006,0.70547444,0.0028030863,0.15519251],"study_design_scores_gemma":[0.010048117,0.0017428972,0.012266067,0.00068891636,0.00041398636,0.0054242495,0.17297214,0.47477785,0.041512437,0.10228973,0.17420691,0.003656713],"about_ca_topic_score_codex":0.00008249967,"about_ca_topic_score_gemma":0.00010949057,"teacher_disagreement_score":0.6031847,"about_ca_system_score_codex":0.00028667843,"about_ca_system_score_gemma":0.0001467472,"threshold_uncertainty_score":0.8632068},"labels":[],"label_agreement":null},{"id":"W4293771037","doi":"10.3390/buildings12091337","title":"Integration of Building Information Modeling (BIM) and Virtual Design and Construction (VDC) with Stick-Built Construction to Implement Digital Construction: A Canadian General Contractor’s Perspective","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Building information modeling; Engineering; Perspective (graphical); Promotion (chess); Construction management; Benchmark (surveying); Construction industry; Construction engineering; Engineering management; Process management; Systems engineering; Civil engineering; Computer science; Operations management","score_opus":0.00897431499596008,"score_gpt":0.20584614462891218,"score_spread":0.1968718296329521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293771037","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.563242,0.000045112665,0.43549803,0.00010689459,0.00033520523,0.00038702306,0.00009835849,0.00008533875,0.00020197906],"genre_scores_gemma":[0.9151489,0.000020133139,0.08456614,0.000046446727,0.00006722012,0.00009136591,0.00003570271,0.000020546602,0.0000035490023],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986882,0.00003661311,0.00045583423,0.00025635972,0.00028913442,0.00027384545],"domain_scores_gemma":[0.9991955,0.000037909216,0.00012926539,0.00012258747,0.0003119804,0.0002027222],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018886174,0.00024478993,0.0002462158,0.00058225257,0.00038716642,0.00022400833,0.00007647613,0.0000819072,0.000049232018],"category_scores_gemma":[0.00004586099,0.00025812103,0.000034640823,0.00037834907,0.00014200175,0.0012030125,0.00003957225,0.0002719892,7.4776045e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028789643,0.000012464244,0.0016778958,0.00003700238,0.00017592456,0.0000026165746,0.003358721,0.19411212,0.01648401,0.5901171,0.000121934245,0.19361234],"study_design_scores_gemma":[0.0034157278,0.0013381005,0.0010745134,0.00017309391,0.00023224395,0.0036241624,0.084021315,0.8759364,0.014086741,0.010069859,0.004596125,0.0014317048],"about_ca_topic_score_codex":0.0053132637,"about_ca_topic_score_gemma":0.00088877627,"teacher_disagreement_score":0.68182427,"about_ca_system_score_codex":0.00065955264,"about_ca_system_score_gemma":0.00019859556,"threshold_uncertainty_score":0.9999871},"labels":[],"label_agreement":null},{"id":"W4293791618","doi":"10.35199/epde.2022.27","title":"PERFECTION VS IMPERFECTION - EVOLVING PERCEPTUAL QUALITIES OF CONCRETE","year":2022,"lang":"en","type":"article","venue":"DS 117: Proceedings of the 24th International Conference on Engineering and Product Design Education (E&amp;PDE 2022), London South Bank University in London, UK. 8th - 9th September 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Perfection; Perception; Computer science; Artificial intelligence; Psychology; Epistemology","score_opus":0.017709684060276922,"score_gpt":0.21720000706236,"score_spread":0.19949032300208308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293791618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9892532,0.00037182836,0.0013441803,0.00024348494,0.0036797374,0.00056987786,0.00012224703,0.00015976319,0.0042556836],"genre_scores_gemma":[0.99252,0.00016346227,0.0008014958,0.000026668067,0.00015609857,0.000042817355,0.000068299705,0.00003527402,0.006185904],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981997,0.00008474958,0.0004599601,0.00044152717,0.0005616426,0.00025243574],"domain_scores_gemma":[0.9988636,0.00008202793,0.0002755789,0.00020262772,0.00050261134,0.00007357051],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0006411114,0.000302979,0.0003211117,0.00074605807,0.00024607105,0.000067453904,0.00043323715,0.00009698735,0.0015544611],"category_scores_gemma":[0.0001388882,0.0003296125,0.00012412242,0.00074672874,0.00011243746,0.0004054843,0.00012920785,0.00066369784,0.000007843545],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023851208,0.00047337412,0.0629613,0.0023223734,0.0012104112,0.000002754327,0.07180272,0.18452424,0.48272678,0.121943496,0.059099957,0.010547471],"study_design_scores_gemma":[0.011011632,0.0025039988,0.07309105,0.0032139171,0.0011745704,0.00082653697,0.15915085,0.33025628,0.104512565,0.004456037,0.30257255,0.0072300057],"about_ca_topic_score_codex":0.00015527339,"about_ca_topic_score_gemma":0.000017381315,"teacher_disagreement_score":0.3782142,"about_ca_system_score_codex":0.00051726564,"about_ca_system_score_gemma":0.00020231356,"threshold_uncertainty_score":0.9999156},"labels":[],"label_agreement":null},{"id":"W4293842690","doi":"10.1139/cjce-2022-0185","title":"Optimization of earthworks planning: a systematic mapping study","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Earthworks; Scheduling (production processes); Integer programming; Linear programming; Computer science; Operations research; Mathematical optimization; Engineering; Operations management; Mathematics","score_opus":0.008980381808298047,"score_gpt":0.1714537871525568,"score_spread":0.16247340534425875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293842690","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28807738,0.0053389715,0.6995388,0.000032566884,0.003998905,0.00054465944,0.000014738035,0.00009524223,0.0023587204],"genre_scores_gemma":[0.9994598,0.0000019838517,0.0004366795,0.0000035908781,0.00005395813,0.000010825624,0.0000010590248,0.000019041714,0.000013078836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922496,0.000024646652,0.00042321743,0.000043887114,0.0001527157,0.00013059328],"domain_scores_gemma":[0.99958444,0.000026856547,0.00010205343,0.00008514661,0.0000704842,0.00013104817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026116808,0.000084131585,0.00021489168,0.0005423219,0.00006347732,0.000024102565,0.00012401199,0.000024173793,0.00017949317],"category_scores_gemma":[0.000040950217,0.00009252322,0.0000557144,0.00032447177,0.0000065349004,0.00010803472,0.0000052454297,0.0002453866,3.4633732e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.3239584e-7,0.000003384525,0.0008614224,0.00040825043,0.00006516289,0.000024378398,0.0015127622,0.9968002,0.00008430726,0.00008636242,0.00011157858,0.000041251315],"study_design_scores_gemma":[0.0004165786,0.00013515682,0.00094615447,0.0011516085,0.00006313612,0.00042868117,0.0072561526,0.9888507,0.00005731142,0.000016670849,0.00048150486,0.0001963546],"about_ca_topic_score_codex":0.00005553512,"about_ca_topic_score_gemma":0.0010679548,"teacher_disagreement_score":0.7113824,"about_ca_system_score_codex":0.00015256848,"about_ca_system_score_gemma":0.00011123036,"threshold_uncertainty_score":0.37729877},"labels":[],"label_agreement":null},{"id":"W4296077643","doi":"10.29173/mocs286","title":"Operations management concepts applied to offsite construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Construction management; Construction engineering; Construction industry; Production (economics); Risk analysis (engineering); Architecture; Engineering; Engineering management; Systems engineering; Computer science; Business; Civil engineering","score_opus":0.0052091785366271265,"score_gpt":0.1940127567568409,"score_spread":0.18880357822021376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92597806,0.00034990214,0.03965043,0.00042014476,0.0029141912,0.0013774768,0.00010395653,0.001128103,0.028077748],"genre_scores_gemma":[0.9743325,0.000111052555,0.023829767,0.00026529082,0.00023262438,0.0005053665,0.00007397502,0.000057102225,0.0005922835],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980722,0.00001725307,0.00050697534,0.00058120344,0.00043255909,0.00038980052],"domain_scores_gemma":[0.9993527,0.000009701035,0.00007090219,0.00018588571,0.00016807129,0.00021273801],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019133398,0.00035570396,0.00032087677,0.0005130232,0.00090586627,0.00026092058,0.00018520952,0.000116072806,0.000516479],"category_scores_gemma":[0.000006697707,0.00041684098,0.0000926469,0.00079109846,0.00020132467,0.0004348563,0.00014199712,0.00039654004,0.00004668054],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015447973,0.00006687419,0.007265307,0.00028243483,0.00038599476,0.000008898867,0.001658389,0.027393416,0.028080907,0.4285281,0.006694394,0.4994808],"study_design_scores_gemma":[0.0055655935,0.00046548073,0.010295593,0.00016988715,0.00060294644,0.001498562,0.048969768,0.069136366,0.026564896,0.005673956,0.82759386,0.0034630988],"about_ca_topic_score_codex":0.0000169253,"about_ca_topic_score_gemma":0.000015520945,"teacher_disagreement_score":0.8208995,"about_ca_system_score_codex":0.00024287264,"about_ca_system_score_gemma":0.000022890386,"threshold_uncertainty_score":0.99982834},"labels":[],"label_agreement":null},{"id":"W4296077796","doi":"10.29173/mocs285","title":"VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Constructability; Industrialisation; Bridge (graph theory); Prefabrication; Engineering; Construction engineering; Process (computing); Civil engineering; Structural engineering; Computer science","score_opus":0.026368304651567462,"score_gpt":0.24863909518441432,"score_spread":0.22227079053284687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946352,0.000119645985,0.0023819061,0.000040977713,0.0006151029,0.0012563311,0.000011385897,0.00016338435,0.00077603455],"genre_scores_gemma":[0.9991434,0.00003272001,0.0002575354,0.000036045854,0.00012519646,0.00030648045,0.000021853595,0.000028391423,0.00004837284],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844253,0.000041608786,0.0004781123,0.00035355502,0.00042661667,0.00025755225],"domain_scores_gemma":[0.9995442,0.000009118549,0.00012940497,0.00013810892,0.00012295939,0.000056190227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039893412,0.00024297746,0.00020550936,0.00039043967,0.0005640799,0.00021011438,0.00015555302,0.00008141554,0.0000563749],"category_scores_gemma":[0.000008688084,0.00023111791,0.000044992637,0.0010098448,0.00007231036,0.00044799747,0.000066881024,0.00038303525,0.0000025519055],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044057195,0.0006474391,0.34800348,0.0011046628,0.0010525818,0.001037194,0.03599658,0.21060318,0.0034820554,0.008862144,0.002790201,0.38597992],"study_design_scores_gemma":[0.007652995,0.00056803424,0.017352333,0.00015745356,0.0007654354,0.008474076,0.3312928,0.6150348,0.0026441887,0.00077471475,0.013519114,0.0017639865],"about_ca_topic_score_codex":0.00019855979,"about_ca_topic_score_gemma":0.00002245664,"teacher_disagreement_score":0.40443167,"about_ca_system_score_codex":0.00023464068,"about_ca_system_score_gemma":0.000019625657,"threshold_uncertainty_score":0.9424715},"labels":[],"label_agreement":null},{"id":"W4296077905","doi":"10.29173/mocs270","title":"Automated BIM-based CNC file generator for wood panel framing machines in construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Framing (construction); Software; Automation; Numerical control; Computer science; Building information modeling; Information model; Software engineering; Manufacturing engineering; Engineering drawing; Engineering; Mechanical engineering; Operating system","score_opus":0.009069530823881115,"score_gpt":0.19347044105629005,"score_spread":0.18440091023240893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9862988,0.00031551236,0.009389511,0.000090844675,0.001439975,0.0005859254,0.0003887352,0.0011752998,0.00031537228],"genre_scores_gemma":[0.9758966,0.000029884744,0.022868466,0.00007960881,0.00022424736,0.00050145655,0.00028037163,0.00006718522,0.000052203635],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983023,0.000021514687,0.0005206787,0.00049220695,0.00026964754,0.00039364732],"domain_scores_gemma":[0.99945843,0.000042095482,0.0001451548,0.00012282662,0.00012167972,0.00010979403],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019389906,0.0003470333,0.00034308832,0.000587991,0.0005600862,0.00018470224,0.00013341998,0.00017721603,0.00051933574],"category_scores_gemma":[0.000028313218,0.00039551748,0.00011417974,0.0004190953,0.0001391155,0.00044811188,0.000047481688,0.00041231952,0.0000037043978],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000548422,0.00019201696,0.060726974,0.0019838267,0.00044443138,0.000022797172,0.0012655699,0.08271085,0.10521617,0.02659702,0.011061911,0.70923],"study_design_scores_gemma":[0.0021761192,0.00012212152,0.0050799274,0.00009362763,0.000073926145,0.00025274683,0.002419187,0.9171153,0.047088616,0.0013069598,0.023477307,0.0007941692],"about_ca_topic_score_codex":0.000050400115,"about_ca_topic_score_gemma":0.00002994509,"teacher_disagreement_score":0.83440447,"about_ca_system_score_codex":0.00022488601,"about_ca_system_score_gemma":0.000047759608,"threshold_uncertainty_score":0.9998497},"labels":[],"label_agreement":null},{"id":"W4296077909","doi":"10.29173/mocs288","title":"Front matter, 2022 Proceedings of the Modular and Offsite Construction Summit","year":2022,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Summit; Modular design; Front (military); Modular construction; Engineering; Library science; Computer science; Geography; Mechanical engineering; Physical geography; Operating system","score_opus":0.004970221250371859,"score_gpt":0.179135614013074,"score_spread":0.17416539276270215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9185971,0.010773483,0.001190615,0.00034680634,0.011601783,0.0022515997,0.0010651344,0.0004955482,0.05367791],"genre_scores_gemma":[0.8800567,0.018347858,0.013371769,0.00056566764,0.0035573773,0.0012963662,0.0007552077,0.0009951729,0.08105392],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9958944,0.000031603424,0.001268975,0.0012095417,0.00090674445,0.0006887547],"domain_scores_gemma":[0.99792993,0.0000308601,0.00078879175,0.00032020765,0.000672162,0.00025807085],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00030246403,0.0010470907,0.0011647894,0.00078531576,0.0008086632,0.00045613036,0.0004991154,0.00085994066,0.005746493],"category_scores_gemma":[0.000028270371,0.0009921758,0.0003740108,0.00082369347,0.001050964,0.0009840395,0.00035342464,0.0016328131,0.00018984349],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006039248,0.00022323187,0.14395046,0.010948185,0.0028143749,0.000008663308,0.0027478237,0.0012527441,0.06943514,0.02132456,0.4848699,0.261821],"study_design_scores_gemma":[0.0032240176,0.00032492605,0.009150051,0.0013673953,0.0011463838,0.0014068759,0.008886557,0.014917004,0.025790663,0.001801762,0.92854625,0.0034380842],"about_ca_topic_score_codex":0.00009127616,"about_ca_topic_score_gemma":0.00002150298,"teacher_disagreement_score":0.44367638,"about_ca_system_score_codex":0.00034684598,"about_ca_system_score_gemma":0.00009544852,"threshold_uncertainty_score":0.99925286},"labels":[],"label_agreement":null},{"id":"W4296078332","doi":"10.29173/mocs263","title":"Iot-based architecture to improve workflow in bricks manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Automation; Internet of Things; Architecture; Computer science; Quality (philosophy); Production (economics); Manufacturing engineering; Process (computing); Business; Process management; Database; World Wide Web; Engineering; Operating system","score_opus":0.0037848789348729115,"score_gpt":0.17216495140487134,"score_spread":0.16838007246999842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078332","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9863733,0.00020554583,0.009953188,0.00022634014,0.0010379715,0.0003924438,0.000027297088,0.0003365281,0.0014473875],"genre_scores_gemma":[0.99183524,0.000009975731,0.0074293274,0.00019370463,0.0001544761,0.00016448658,0.00001421682,0.000041299416,0.0001572881],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99860775,0.000013243882,0.00033232567,0.00042670322,0.0002743533,0.00034562207],"domain_scores_gemma":[0.99961436,0.000014634145,0.000057512138,0.00011995898,0.000054217464,0.0001392974],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015751642,0.00026513133,0.0002454622,0.0005415879,0.00027038204,0.00012777472,0.00014014896,0.00010885794,0.00017210392],"category_scores_gemma":[0.000011975676,0.00029732694,0.0000781923,0.00045853396,0.00006798811,0.00015048448,0.00006532289,0.000555904,0.0000071758564],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001536056,0.000035989382,0.017786603,0.00021531328,0.000058487443,0.000011780333,0.0008270448,0.05552916,0.02997666,0.0018009753,0.000737548,0.89286685],"study_design_scores_gemma":[0.007363635,0.00079121196,0.040919032,0.00044697645,0.0002044483,0.0007756724,0.010544798,0.23917928,0.37688228,0.009202954,0.3095694,0.0041203],"about_ca_topic_score_codex":0.000036664234,"about_ca_topic_score_gemma":0.000035802754,"teacher_disagreement_score":0.88874656,"about_ca_system_score_codex":0.00018005219,"about_ca_system_score_gemma":0.00002439952,"threshold_uncertainty_score":0.9999479},"labels":[],"label_agreement":null},{"id":"W4296078947","doi":"10.29173/mocs258","title":"A proposed conceptual framework for Computational Design Sustainability in Industrialized Building","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Underpinning; Mainstream; Context (archaeology); Satisficing; Management science; Conceptual framework; Computer science; Knowledge management; Process management; Risk analysis (engineering); Engineering; Business; Political science; Sociology; Civil engineering","score_opus":0.017388451956763723,"score_gpt":0.2360175156321324,"score_spread":0.2186290636753687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078947","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5255888,0.00016590868,0.4720007,0.00023809649,0.000628847,0.0010468306,0.000029459296,0.00023078595,0.00007058662],"genre_scores_gemma":[0.93788916,0.000008574363,0.061516806,0.000040284296,0.00013524934,0.00032704056,0.000025209465,0.000029805822,0.000027880847],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985572,0.000042127394,0.0004456689,0.00038610626,0.00026313012,0.00030577788],"domain_scores_gemma":[0.99934876,0.000104246654,0.000105337676,0.0000737184,0.00028247954,0.000085439635],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046787024,0.00022389481,0.00028837836,0.00030392318,0.00039877236,0.00012134235,0.00011453123,0.00017636034,0.000095241885],"category_scores_gemma":[0.00016092852,0.00025753584,0.00007778574,0.00053413096,0.0002435165,0.0003443757,0.00004720541,0.0004860677,5.8901566e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007330788,0.00008736577,0.023102757,0.00029651218,0.00013683591,0.0000043691357,0.0023092048,0.16323937,0.002825988,0.7043643,0.0011030085,0.10179721],"study_design_scores_gemma":[0.0059065507,0.0004289753,0.002079482,0.000105758954,0.000102075224,0.00016857474,0.02879911,0.5871542,0.0048484425,0.34632328,0.022981232,0.0011023051],"about_ca_topic_score_codex":0.000014985729,"about_ca_topic_score_gemma":0.0000019492188,"teacher_disagreement_score":0.42391482,"about_ca_system_score_codex":0.00041287424,"about_ca_system_score_gemma":0.00011080414,"threshold_uncertainty_score":0.99998766},"labels":[],"label_agreement":null},{"id":"W4296079369","doi":"10.29173/mocs278","title":"A principal component analysis of Organisational BIM Implementation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nonprobability sampling; Building information modeling; Status quo; Process management; Yardstick; Process (computing); Knowledge management; Principal (computer security); Construction industry; Business; Competitive advantage; Computer science; Operations management; Engineering; Construction engineering; Marketing","score_opus":0.007207543096686039,"score_gpt":0.20973705302531076,"score_spread":0.20252950992862473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9912206,0.00013099088,0.0072530154,0.00006552873,0.00036619883,0.00018618711,0.00010222742,0.00014284615,0.0005324315],"genre_scores_gemma":[0.99717665,0.000036640315,0.0024266762,0.000027718848,0.000053882675,0.000056505683,0.00017656294,0.000016744118,0.00002862108],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99882394,0.000013518913,0.00041049183,0.00024286588,0.0003481476,0.00016102975],"domain_scores_gemma":[0.9995495,0.000011468393,0.00013396323,0.000076411474,0.00016395366,0.0000647179],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00016428094,0.00015624249,0.00024801193,0.00060605636,0.00026855097,0.000052515195,0.000083935505,0.000051318264,0.0009960571],"category_scores_gemma":[0.0000048154843,0.00017759245,0.00010703817,0.0009699449,0.00009520047,0.00025630888,0.000051899722,0.00016558898,0.000001992015],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011322443,0.00009432744,0.5359998,0.00022510774,0.002654613,0.0000024635474,0.0025411488,0.019775575,0.106942765,0.20339033,0.00080175424,0.1274589],"study_design_scores_gemma":[0.0033876584,0.00034913872,0.46958452,0.00003179633,0.0028987012,0.00023739954,0.03275637,0.38696083,0.048191484,0.004000755,0.05015849,0.0014428722],"about_ca_topic_score_codex":0.000042957185,"about_ca_topic_score_gemma":0.000023551638,"teacher_disagreement_score":0.36718526,"about_ca_system_score_codex":0.0001352824,"about_ca_system_score_gemma":0.0000251772,"threshold_uncertainty_score":0.99991715},"labels":[],"label_agreement":null},{"id":"W4296079407","doi":"10.29173/mocs265","title":"Lessons Learned from adopting modular construction in Brazil: A startup journey","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Standardization; Business; Revenue; Variety (cybernetics); Scale (ratio); Investment (military); Product (mathematics); Marketing; New product development; Start up; Operations management; Process management; Engineering management; Engineering; Finance; Computer science; Political science; Business administration","score_opus":0.021997019170221628,"score_gpt":0.23070827472586747,"score_spread":0.20871125555564585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.988514,0.0009191742,0.0057595535,0.00065645244,0.0015157872,0.00033631327,0.00010242271,0.0005153543,0.0016809376],"genre_scores_gemma":[0.9879898,0.0004504583,0.010829685,0.00009951968,0.00026422727,0.00011474085,0.000081341896,0.00006861633,0.0001016077],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976878,0.00004775999,0.0006669559,0.000657261,0.00046531248,0.00047488525],"domain_scores_gemma":[0.99924815,0.000032074244,0.00019169501,0.00018393835,0.00016812762,0.0001760399],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003419185,0.0003930831,0.00043769818,0.000597777,0.00062716426,0.00026722535,0.00019426786,0.000208093,0.0004504552],"category_scores_gemma":[0.000043582517,0.00047006735,0.0001287956,0.0007790556,0.00024446833,0.0008523576,0.00011679151,0.00094613375,0.000011834188],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025893422,0.00009483727,0.107865684,0.00021275763,0.00029927515,0.000031308693,0.0026560198,0.01761793,0.0661472,0.044781115,0.0013828966,0.75865203],"study_design_scores_gemma":[0.010942325,0.0005285744,0.045005158,0.0006085941,0.00051218877,0.0019772844,0.0740331,0.53404474,0.027157009,0.056671508,0.24395269,0.0045668203],"about_ca_topic_score_codex":0.00016551829,"about_ca_topic_score_gemma":0.00007149738,"teacher_disagreement_score":0.75408524,"about_ca_system_score_codex":0.00031881512,"about_ca_system_score_gemma":0.000055207485,"threshold_uncertainty_score":0.9997751},"labels":[],"label_agreement":null},{"id":"W4296079452","doi":"10.29173/mocs283","title":"Layout modelling of the built environment for autonomous mobile robots using Building Information Modelling (BIM) and simulation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Robot; Building information modeling; Mobile robot; Robotics; Computer science; A priori and a posteriori; Systems engineering; Artificial intelligence; Human–computer interaction; Control engineering; Simulation; Engineering","score_opus":0.01766596912926466,"score_gpt":0.19896615713084348,"score_spread":0.18130018800157882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079452","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5372919,0.00021863003,0.46183115,0.000008953491,0.0002118011,0.0003347776,0.000021524302,0.000051634663,0.000029644378],"genre_scores_gemma":[0.96503145,0.000057486144,0.034704294,0.0000147222145,0.000057811616,0.00008852464,0.000013341183,0.000021901335,0.000010461875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989426,0.000010101629,0.00043006145,0.00020615275,0.00022534648,0.00018570617],"domain_scores_gemma":[0.9995536,0.000021430082,0.00018490785,0.00009318524,0.000097409065,0.000049468334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018916701,0.00018572489,0.00019523693,0.0001835868,0.0005391111,0.0000942239,0.00008453358,0.00009119225,0.000014281188],"category_scores_gemma":[0.0000051806824,0.00018488956,0.000075775504,0.00016940005,0.00009579907,0.000770777,0.00007010565,0.00019537652,2.600343e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020865722,0.0000054382344,0.000991919,0.00010890307,0.00002660858,3.313204e-8,0.00058817526,0.9757762,0.0024353184,0.002107138,0.0000029630153,0.017936446],"study_design_scores_gemma":[0.00039690713,0.000035310924,0.000043993063,0.000031046075,0.000064515894,0.00002500181,0.0012162079,0.99063456,0.0028372165,0.0011365274,0.0033866158,0.00019208083],"about_ca_topic_score_codex":0.000037440343,"about_ca_topic_score_gemma":9.061322e-7,"teacher_disagreement_score":0.42773956,"about_ca_system_score_codex":0.00014544744,"about_ca_system_score_gemma":0.000018397202,"threshold_uncertainty_score":0.75395775},"labels":[],"label_agreement":null},{"id":"W4296079866","doi":"10.29173/mocs255","title":"Design-for-Manufacturing-and-Assembly (DfMA) for the construction industry: A review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal; Polytechnique Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Engineering; Systematic review; Construction industry; Computer science; Engineering management; Manufacturing engineering; Construction engineering","score_opus":0.04268418942031275,"score_gpt":0.2647113452291091,"score_spread":0.22202715580879637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079866","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008400972,0.9672183,0.026167432,0.00014246826,0.0018637268,0.003808312,0.00013928358,0.0003688204,0.0002076928],"genre_scores_gemma":[0.00006588489,0.9896071,0.0067582703,0.00009095747,0.0004942513,0.00257132,0.00012425936,0.00012862479,0.0001593137],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99746895,0.000044600998,0.0009521951,0.00075599574,0.0003103969,0.0004678823],"domain_scores_gemma":[0.99864155,0.00029392453,0.00046653574,0.00024839878,0.00018881322,0.0001607817],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00066875236,0.0007648825,0.0013706593,0.0003445917,0.00084441865,0.00031265116,0.00027847264,0.0007413131,0.00012208289],"category_scores_gemma":[0.00009950781,0.0006227266,0.00044493665,0.00040324268,0.0003248445,0.00042189352,0.00008265825,0.0011362834,0.000003474426],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014095583,0.000005230649,0.00000708011,0.020173337,0.0003161736,4.2932396e-7,0.000031235046,0.000016899747,0.000006001016,0.0034261434,0.0027406665,0.9732627],"study_design_scores_gemma":[0.00040207553,0.000083572144,0.0000027611875,0.004749528,0.0019046221,0.0006978539,0.0003277019,0.0018329996,0.00011547975,0.00053023343,0.98867685,0.0006763122],"about_ca_topic_score_codex":0.0000070673796,"about_ca_topic_score_gemma":0.0000022029733,"teacher_disagreement_score":0.98593616,"about_ca_system_score_codex":0.00022041917,"about_ca_system_score_gemma":0.000118610515,"threshold_uncertainty_score":0.9996224},"labels":[],"label_agreement":null},{"id":"W4296168386","doi":"10.29173/mocs271","title":"Keyword identification framework for speech communication on construction sites","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Speech recognition; Identification (biology); Mel-frequency cepstrum; Convolutional neural network; Speaker identification; Artificial intelligence; Speaker recognition; Feature extraction","score_opus":0.01208817909986937,"score_gpt":0.21989485929685795,"score_spread":0.20780668019698859,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168386","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92380875,0.0007211924,0.068498425,0.00056056393,0.0019425363,0.0009978294,0.00012407149,0.0008257634,0.002520863],"genre_scores_gemma":[0.9596094,0.00025754873,0.038928766,0.00012321312,0.00023021766,0.00041788258,0.0001914117,0.00005730118,0.00018429362],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99836135,0.00002930437,0.0005242747,0.0004557239,0.00034443117,0.00028489743],"domain_scores_gemma":[0.99906796,0.00007986838,0.0002142482,0.00025789952,0.0002810186,0.00009900336],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003378987,0.00029007904,0.00026702345,0.00038407638,0.0010066916,0.00025837705,0.00020774525,0.00018753498,0.00020355922],"category_scores_gemma":[0.00006842469,0.00034143642,0.000120342884,0.0005060769,0.0002315847,0.00052322465,0.00006036829,0.00052645867,0.000013359146],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021459436,0.000066195425,0.013644737,0.00024587847,0.00016499498,8.5432197e-7,0.00074033113,0.0015073447,0.020760471,0.5917734,0.004084195,0.36679703],"study_design_scores_gemma":[0.004620465,0.00088497734,0.012100852,0.00041700155,0.000603932,0.0011817646,0.027410146,0.19175725,0.11927914,0.38948798,0.24896832,0.003288167],"about_ca_topic_score_codex":0.000008959062,"about_ca_topic_score_gemma":0.0000068515224,"teacher_disagreement_score":0.36350885,"about_ca_system_score_codex":0.00023910626,"about_ca_system_score_gemma":0.00002353826,"threshold_uncertainty_score":0.99990374},"labels":[],"label_agreement":null},{"id":"W4296168686","doi":"10.29173/mocs282","title":"A systematic review of quality management of offsite construction","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Policy Innovation and Co-ordination Office","keywords":"Systematic review; Scopus; Quality (philosophy); Popularity; Quality management; Scope (computer science); Business; Knowledge management; Process management; Engineering; Computer science; Operations management; Political science; Management system; MEDLINE","score_opus":0.020881981109741925,"score_gpt":0.2611452180721949,"score_spread":0.24026323696245294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168686","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00014582698,0.992255,0.0010441242,0.0000094171955,0.0010082608,0.0021654894,0.00015306458,0.00022188894,0.0029969343],"genre_scores_gemma":[0.00010317271,0.9953942,0.0036352572,0.000017319428,0.00006936426,0.00043684072,0.00013661485,0.00007573795,0.00013154394],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9956005,0.00011366932,0.0026804272,0.00060554984,0.0006878753,0.00031192988],"domain_scores_gemma":[0.9975379,0.00006632213,0.0015397877,0.00040404696,0.00032772034,0.00012424018],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00084515626,0.0006827235,0.003203849,0.00058700226,0.0001607325,0.000061029896,0.00031836107,0.0003392062,0.00031362986],"category_scores_gemma":[0.000055210337,0.0006456088,0.0007335113,0.0010908997,0.00035513748,0.00035491254,0.00012483589,0.0005494322,0.0000078668645],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004639622,0.000013450691,0.00001619407,0.7030874,0.0006669943,0.0000012738636,0.000029973615,0.0000015352036,0.0000047161057,0.015289391,0.00009199493,0.28079244],"study_design_scores_gemma":[0.0005061081,0.000081289734,0.0000111764575,0.6594241,0.0069369767,0.00065793144,0.0014957861,0.00017256795,0.0000653507,0.00038270914,0.32919836,0.0010676039],"about_ca_topic_score_codex":0.000012636042,"about_ca_topic_score_gemma":0.0000014665358,"teacher_disagreement_score":0.32910636,"about_ca_system_score_codex":0.00023574385,"about_ca_system_score_gemma":0.00006111647,"threshold_uncertainty_score":0.9995995},"labels":[],"label_agreement":null},{"id":"W4296272403","doi":"10.29173/mocs284","title":"An holistic approach to product evaluation and selection in industrialised building: Benchmarking of long span, low carbon floor systems","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Melbourne; Monash University; Australian Government","keywords":"Benchmarking; Product (mathematics); Quality (philosophy); Selection (genetic algorithm); Key (lock); Systems engineering; New product development; Computer science; Risk analysis (engineering); Production (economics); Process management; Engineering; Architectural engineering; Construction engineering; Business; Marketing; Artificial intelligence","score_opus":0.017320336266655204,"score_gpt":0.2296527835737729,"score_spread":0.2123324473071177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99261504,0.0003766526,0.0046539633,0.000015317813,0.00077830383,0.00094653346,0.000011206634,0.00012298377,0.0004799848],"genre_scores_gemma":[0.99775404,0.000020177022,0.0016039632,0.000006468584,0.00028894967,0.0002553202,0.000027020618,0.000030570303,0.000013520181],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982802,0.00006168272,0.00048216124,0.0004975623,0.0004378742,0.00024049146],"domain_scores_gemma":[0.99938285,0.000009264824,0.00014198363,0.00008081907,0.00027696544,0.00010810452],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007795663,0.00023124702,0.00031408606,0.0006544954,0.00019961501,0.00014047854,0.000090805304,0.00012057797,0.000013767752],"category_scores_gemma":[0.000048942155,0.0002682605,0.00003146974,0.00089479994,0.00007563276,0.00040937614,0.000036696907,0.00035337833,1.7291156e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003194769,0.00017145461,0.25521696,0.0011636834,0.00015657635,0.0000019701959,0.0027070101,0.31541318,0.13937268,0.0058855833,0.00015062642,0.27944082],"study_design_scores_gemma":[0.0011726253,0.00015213729,0.03174315,0.00011339333,0.000108018714,0.00019086375,0.0031226827,0.9549978,0.0075984704,0.00015394815,0.00023637999,0.0004105721],"about_ca_topic_score_codex":0.00021733173,"about_ca_topic_score_gemma":0.000018949022,"teacher_disagreement_score":0.6395846,"about_ca_system_score_codex":0.00027941956,"about_ca_system_score_gemma":0.0000495707,"threshold_uncertainty_score":0.99997693},"labels":[],"label_agreement":null},{"id":"W4296272583","doi":"10.29173/mocs287","title":"Carbon emissions comparison in modular and site-built residential construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Modular design; Life-cycle assessment; Prefabrication; Construction waste; Environmental impact assessment; Productivity; Environmental economics; Engineering; Environmental resource management; Business; Production (economics); Environmental planning; Environmental science; Civil engineering; Waste management; Computer science; Economics","score_opus":0.007888409632422756,"score_gpt":0.2051085963982159,"score_spread":0.19722018676579314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99371034,0.0012325189,0.0012172422,0.00013007689,0.0011891733,0.00034974958,0.00003062089,0.00032946118,0.0018108475],"genre_scores_gemma":[0.99672276,0.00024118711,0.00254521,0.000029340066,0.00017418833,0.00009221112,0.000040233608,0.000044365413,0.00011051301],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980407,0.00003789406,0.00060516933,0.0005547303,0.0003899027,0.00037165364],"domain_scores_gemma":[0.99938756,0.000020503323,0.00014262387,0.00014857386,0.00012665693,0.00017408174],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024523775,0.00033819064,0.0004115778,0.00059160724,0.00049922575,0.000182614,0.000119137345,0.00019695453,0.00013236514],"category_scores_gemma":[0.00002485164,0.00039575627,0.0000747753,0.000622436,0.0002855902,0.00046889758,0.00012458858,0.00068989623,0.0000026238538],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021939371,0.00007992363,0.74130845,0.0003510526,0.00013828976,0.000017911418,0.0021978791,0.00771985,0.1045481,0.016882997,0.0011257342,0.12541042],"study_design_scores_gemma":[0.0061519532,0.00045234006,0.07520394,0.00032586788,0.0003866388,0.0023274962,0.028159807,0.7908375,0.034554902,0.009907642,0.049018826,0.0026730474],"about_ca_topic_score_codex":0.00019324818,"about_ca_topic_score_gemma":0.00010132066,"teacher_disagreement_score":0.7831177,"about_ca_system_score_codex":0.00019356448,"about_ca_system_score_gemma":0.000036218204,"threshold_uncertainty_score":0.99984944},"labels":[],"label_agreement":null},{"id":"W4296272818","doi":"10.29173/mocs275","title":"Affordable wall panels using sustainable waste materials: a review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Carbon footprint; Modular design; Sustainability; Resource depletion; Population; Urbanization; Ecological footprint; Greenhouse gas; Engineering; Sustainable development; Business; Waste management; Economic growth; Computer science; Economics","score_opus":0.027773413603414267,"score_gpt":0.24862296377579834,"score_spread":0.22084955017238408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272818","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00061838544,0.99399066,0.00044721842,0.000017018452,0.0012250121,0.0014078411,0.00006804888,0.00045208595,0.0017737382],"genre_scores_gemma":[0.00009042182,0.99666905,0.0011118561,0.000051180086,0.00036546675,0.00036213352,0.0001718699,0.00015593901,0.0010220536],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.997012,0.00005581617,0.0011356545,0.0007250173,0.0004032691,0.00066822296],"domain_scores_gemma":[0.99884623,0.000028804227,0.00043789166,0.0002719204,0.00022967136,0.00018548389],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0005227791,0.0008110457,0.0018375872,0.000537812,0.0005255132,0.00039351502,0.00029147466,0.00042687618,0.0012414027],"category_scores_gemma":[0.000046438756,0.00078779546,0.00037039045,0.0009070246,0.00016418815,0.0008025988,0.00016130526,0.0006728874,0.000020884494],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075962785,0.000014664194,0.000009735429,0.119441286,0.00029598144,0.000016204109,0.000068307505,0.000019728666,0.00010584444,0.006035714,0.0016237327,0.8723612],"study_design_scores_gemma":[0.00019377458,0.000033916782,2.785364e-7,0.0108246,0.0010978009,0.000865009,0.0007509515,0.00051139435,0.00013976128,0.00024287973,0.9845448,0.000794799],"about_ca_topic_score_codex":0.00005453046,"about_ca_topic_score_gemma":0.0000015372964,"teacher_disagreement_score":0.9829211,"about_ca_system_score_codex":0.0005120655,"about_ca_system_score_gemma":0.00014532759,"threshold_uncertainty_score":0.9996716},"labels":[],"label_agreement":null},{"id":"W4296450886","doi":"10.3390/su14159780","title":"Modeling and Performance Analysis for High-Rise Building Using ArchiCAD: Initiatives towards Energy-Efficient Building","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Ministry of Higher Education, Malaysia","keywords":"Retrofitting; Glazing; Energy consumption; Efficient energy use; Architectural engineering; Energy conservation; Cooling load; Audit; Building information modeling; Computer science; Environmental economics; Civil engineering; Engineering; Operations management; Mechanical engineering; Air conditioning; Business; Structural engineering; Scheduling (production processes)","score_opus":0.011366147113004462,"score_gpt":0.24910190588456194,"score_spread":0.23773575877155748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296450886","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55945724,0.00013831229,0.44006896,0.000032757864,0.000089322944,0.00010546248,0.000013892811,0.00007479377,0.000019241183],"genre_scores_gemma":[0.9931285,0.000010251847,0.0066432008,0.0000094914785,0.000046028905,0.00013284943,0.000008152298,0.000016352331,0.0000051732177],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897695,0.00006204191,0.00026327115,0.00027105364,0.00016473455,0.00026197286],"domain_scores_gemma":[0.99947786,0.000045759687,0.000034814762,0.00017386438,0.0002134694,0.000054242006],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042336632,0.0001392806,0.0002020156,0.00030246822,0.0004992288,0.000043388365,0.00009044889,0.000038635328,0.000018513128],"category_scores_gemma":[0.00007829765,0.00015043118,0.0000910103,0.0006013866,0.000056690824,0.00014949012,0.000086253414,0.00017177794,1.8327727e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027766057,0.000013977068,0.00282266,0.00010106134,0.00008359739,3.9085907e-7,0.00043318997,0.958169,0.00028040988,0.022331195,5.9056845e-7,0.01573615],"study_design_scores_gemma":[0.00016343601,0.00003630022,0.002195118,0.000003913073,0.00011353057,0.0000030566246,0.0015271552,0.9883746,0.00082079833,0.0065324246,0.000064025946,0.00016567972],"about_ca_topic_score_codex":0.00020648084,"about_ca_topic_score_gemma":0.000007935204,"teacher_disagreement_score":0.43367124,"about_ca_system_score_codex":0.00078045705,"about_ca_system_score_gemma":0.00010472729,"threshold_uncertainty_score":0.6134406},"labels":[],"label_agreement":null},{"id":"W4297154489","doi":"10.3390/app12199542","title":"BIM for Facilities Management: An Investigation into the Asset Information Delivery Process and the Associated Challenges","year":2022,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Fraser Health Authority","keywords":"Building information modeling; Asset (computer security); Process management; Process (computing); Context (archaeology); Business; Facility management; Asset management; Knowledge management; Risk analysis (engineering); Quality (philosophy); Computer science; Operations management; Engineering; Computer security; Marketing","score_opus":0.014898337113708731,"score_gpt":0.206171406099654,"score_spread":0.1912730689859453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297154489","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9892064,0.00032315007,0.000975176,0.0010609396,0.00019828335,0.00053665746,0.000013431014,0.00012989156,0.0075560743],"genre_scores_gemma":[0.9991069,0.00007319748,0.00012221985,0.00011301451,0.000011203542,0.00053773174,0.00001644348,0.0000017500294,0.000017551198],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99956685,0.000022447271,0.00009915613,0.000066774715,0.00017147495,0.000073300784],"domain_scores_gemma":[0.9998223,0.00005844526,0.0000347632,0.000051880925,0.000021461807,0.000011105812],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006402998,0.000048996124,0.00004213206,0.00004948016,0.00075053994,0.000106719104,0.00014113657,0.0000143160005,0.000006559419],"category_scores_gemma":[0.0000069798807,0.000029765537,0.000009540227,0.0001740578,0.0002406753,0.00038010944,0.00002025514,0.000055988505,9.319108e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012655077,0.0000029091113,0.00005886383,0.000051107767,0.000019946521,1.1493437e-8,0.034870017,0.012428643,0.00005007318,0.85419405,0.00015043744,0.0981613],"study_design_scores_gemma":[0.00089184416,0.000075975964,0.0021313848,0.0000079159645,0.00003177404,0.00000255184,0.3984801,0.2407529,0.0006539794,0.3477382,0.009010706,0.00022268698],"about_ca_topic_score_codex":0.000021408132,"about_ca_topic_score_gemma":0.00007555231,"teacher_disagreement_score":0.50645584,"about_ca_system_score_codex":0.00001986671,"about_ca_system_score_gemma":0.000011207252,"threshold_uncertainty_score":0.5772622},"labels":[],"label_agreement":null},{"id":"W4297330760","doi":"10.1007/978-981-19-2145-2","title":"Recent Trends in Construction Technology and Management","year":2022,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Computer science","score_opus":0.004641987600086576,"score_gpt":0.1856242688683406,"score_spread":0.18098228126825402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297330760","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039863153,0.073181875,0.25024208,0.0013762165,0.014776715,0.001794408,0.00012246861,0.004552446,0.6499675],"genre_scores_gemma":[0.8170767,0.09147128,0.052507814,0.000331598,0.00209895,0.002747389,0.0016149152,0.0016091848,0.030542193],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990323,0.000007192257,0.00030259963,0.0002841582,0.00013204452,0.00024170025],"domain_scores_gemma":[0.9997007,0.000032997028,0.000032730175,0.0001953209,0.0000109140055,0.000027321941],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006897407,0.00029569044,0.0002880641,0.0026189545,0.000023339064,0.000021182246,0.000105645915,0.00038453692,0.000488978],"category_scores_gemma":[0.000012236868,0.00035327816,0.00003520915,0.0008299517,0.00003220825,0.00005082678,0.000054102973,0.00097242737,0.000002027423],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034571442,0.0000038399467,0.00012341308,0.00018440379,0.000040004623,0.000030766827,0.00006904958,0.27775303,0.00005179191,0.008297343,0.00020594182,0.713237],"study_design_scores_gemma":[0.00093009527,0.00005346063,0.00056328543,0.00061864394,0.00005962311,0.00029935388,0.000026611391,0.08917669,0.00033871437,0.0145331705,0.89227086,0.0011295067],"about_ca_topic_score_codex":0.0000025824115,"about_ca_topic_score_gemma":0.0005089214,"teacher_disagreement_score":0.8920649,"about_ca_system_score_codex":0.0007425334,"about_ca_system_score_gemma":0.000013753082,"threshold_uncertainty_score":0.99989194},"labels":[],"label_agreement":null},{"id":"W4297825951","doi":"10.3390/buildings12081199","title":"Framework for BIM-Based Simulation of Construction Operations Implemented in a Game Engine","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reuse; Computer science; Building information modeling; Interdependence; Task (project management); Systems engineering; Simulation modeling; Resource (disambiguation); Software engineering; Integration platform; Game engine; Simulation; Human–computer interaction; Engineering; Database","score_opus":0.014156980770158195,"score_gpt":0.2679132904491825,"score_spread":0.2537563096790243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297825951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35855928,0.000031049374,0.64071554,0.000069198206,0.00026401723,0.00021339806,0.00004830357,0.00007224259,0.000026995795],"genre_scores_gemma":[0.9429056,0.0000018308804,0.056767687,0.000028028762,0.00003405902,0.00019267767,0.00005303952,0.000013483992,0.0000035864184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994458,0.000013943869,0.00024641372,0.000095583026,0.00009640084,0.00010184322],"domain_scores_gemma":[0.99974424,0.00007461694,0.000029812634,0.00008297753,0.000051300165,0.000017070697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010221782,0.00007088965,0.000097270764,0.00020843523,0.000061793704,0.00001203521,0.000050784165,0.00003846169,0.00024413863],"category_scores_gemma":[0.000041741157,0.00008456556,0.000042114993,0.00033548425,0.000017232522,0.00007788884,0.000008369906,0.00011452582,5.217463e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016128673,0.000011356568,0.0006766287,0.000017259097,0.000007801037,8.375099e-8,0.00010100312,0.9225021,0.0044474746,0.062305316,0.00002766262,0.009887191],"study_design_scores_gemma":[0.00053938845,0.000051824136,0.00031515246,0.000017114118,0.000009890223,0.0000022071522,0.00025902234,0.9794258,0.0085924,0.0049781087,0.0057129674,0.000096111144],"about_ca_topic_score_codex":0.000021798958,"about_ca_topic_score_gemma":0.000015611708,"teacher_disagreement_score":0.58434635,"about_ca_system_score_codex":0.000108349006,"about_ca_system_score_gemma":0.000027576107,"threshold_uncertainty_score":0.34484833},"labels":[],"label_agreement":null},{"id":"W4298284246","doi":"10.1007/978-3-642-20617-7_100256","title":"Life Cycle Cost Analysis","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Environmental science","score_opus":0.00784247285018043,"score_gpt":0.1870744570094033,"score_spread":0.17923198415922287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298284246","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000067308974,0.000099074176,0.10830434,0.000027984583,0.00028602572,0.000044143046,0.000009150947,0.00026377224,0.8909588],"genre_scores_gemma":[0.049048014,0.00011826691,0.00038221705,0.0002051024,0.00033570887,0.000008964891,0.0000997265,0.000042799726,0.9497592],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995889,0.0000016334674,0.00015410749,0.00010300537,0.00008613092,0.000066245164],"domain_scores_gemma":[0.9996766,0.0000107250235,0.000022980232,0.00017503565,0.0000324474,0.000082255414],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000023534025,0.00013098857,0.000194983,0.0001836909,0.000018914521,0.000025187575,0.000053814172,0.00019233658,0.008252064],"category_scores_gemma":[0.000004030991,0.00012077375,0.00015726424,0.000033856013,0.000016893677,0.0000201423,0.0000056213826,0.00013717447,0.00074195326],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010888987,6.6840516e-7,0.000020075691,0.000016964057,0.0010338348,5.338934e-7,0.0000095249,0.009710833,0.0000062227855,0.8739795,0.026592057,0.08862871],"study_design_scores_gemma":[0.000052311665,0.000004047408,0.000033727112,0.000009431428,0.00046186202,0.000001448466,0.0000037556356,0.052754097,0.00002242405,0.003016613,0.9434107,0.00022959508],"about_ca_topic_score_codex":0.00000813218,"about_ca_topic_score_gemma":0.000105378735,"teacher_disagreement_score":0.9168186,"about_ca_system_score_codex":0.000026758731,"about_ca_system_score_gemma":0.000010202801,"threshold_uncertainty_score":0.9926545},"labels":[],"label_agreement":null},{"id":"W4298286987","doi":"","title":"Environmental assessment of the reuse of marine sediments as fine aggregatesin cemented mortars","year":2015,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Abitibi-Témiscamingue","funders":"","keywords":"Mortar; Reuse; Environmental science; Geology; Geotechnical engineering; Engineering; Waste management; Oceanography","score_opus":0.009518395896857736,"score_gpt":0.21615090067404905,"score_spread":0.2066325047771913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298286987","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94676006,0.00038628845,0.008457894,0.00086598465,0.0005301795,0.00050686934,0.00018244598,0.00011150992,0.042198773],"genre_scores_gemma":[0.98724717,0.00026794875,0.009583618,0.0000114245195,0.000010910929,0.000041106305,0.00040268005,0.00003213864,0.0024030108],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99763304,0.0008792653,0.00057756976,0.00027993578,0.00047092268,0.00015928544],"domain_scores_gemma":[0.997096,0.00016094133,0.0004402274,0.0017812237,0.00044280433,0.00007880111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012750757,0.00023566966,0.00028972566,0.000117173484,0.000069388276,0.000042462856,0.00090512424,0.00018094854,0.00041455048],"category_scores_gemma":[0.00025191714,0.00021310896,0.00015329047,0.00019084773,0.00020033112,0.00007147327,0.0011145648,0.00042219236,0.0000065994677],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009034121,0.0037038457,0.23230457,0.0018574364,0.002516194,0.000009018512,0.017426534,0.026257286,0.1667415,0.08719196,0.016170533,0.44573078],"study_design_scores_gemma":[0.0021774033,0.0000031044078,0.08831728,0.004015169,0.0003227948,0.000023152747,0.0004893639,0.16325824,0.71807593,0.0123682,0.010009039,0.0009403227],"about_ca_topic_score_codex":0.0006777375,"about_ca_topic_score_gemma":0.0003395895,"teacher_disagreement_score":0.55133444,"about_ca_system_score_codex":0.00019572889,"about_ca_system_score_gemma":0.00015527647,"threshold_uncertainty_score":0.8690331},"labels":[],"label_agreement":null},{"id":"W4298326007","doi":"10.1016/j.autcon.2022.104596","title":"Spatial conflict simulator using game engine technology and Bayesian networks for workspace management","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Università Politecnica delle Marche; York University; New York University Abu Dhabi","keywords":"Workspace; Computer science; Simulation; Game engine; Bayesian network; Human–computer interaction; Artificial intelligence; Robot","score_opus":0.0065374399666457954,"score_gpt":0.21549301307792249,"score_spread":0.2089555731112767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298326007","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21355395,0.0001653985,0.78413355,0.0000882112,0.0011107101,0.0004080278,0.0000068106015,0.00038004792,0.00015327193],"genre_scores_gemma":[0.9792731,0.000024505282,0.020372145,0.000015689155,0.00006895936,0.0001850339,0.000022857756,0.000019652654,0.000018059043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992859,0.000023935812,0.00026244062,0.00017206876,0.000096639655,0.00015904839],"domain_scores_gemma":[0.9997403,0.00002940394,0.00006369409,0.00011115524,0.000030263216,0.000025167741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000112961214,0.00011684054,0.00012678491,0.0005607275,0.00013937577,0.00003324412,0.000051372255,0.00009213983,0.00006993248],"category_scores_gemma":[0.0000068763497,0.00014696378,0.00002563467,0.0005229587,0.000055148776,0.00013880782,0.000027093995,0.00016927895,5.6746205e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013048313,0.000005407514,0.0024286353,0.000026249007,0.000024403618,8.9231935e-7,0.00007066136,0.7338376,0.00015426437,0.023130696,0.000031229287,0.24027689],"study_design_scores_gemma":[0.0006269721,0.0000226056,0.0010781266,0.000019110466,0.000019131163,0.000081331615,0.00054344215,0.99282956,0.0001364828,0.0015620872,0.0029394955,0.00014167867],"about_ca_topic_score_codex":0.000010681671,"about_ca_topic_score_gemma":0.000011525362,"teacher_disagreement_score":0.7657192,"about_ca_system_score_codex":0.00018440813,"about_ca_system_score_gemma":0.000010171567,"threshold_uncertainty_score":0.5993009},"labels":[],"label_agreement":null},{"id":"W4299330977","doi":"","title":"General Report of TC 307 – Sustainability in Geotechnical Engineering Rapport général du TC 307 -Développement durable en géotechnique","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sustainability; Geotechnical engineering; Geology","score_opus":0.009302613379655449,"score_gpt":0.22138276888171407,"score_spread":0.2120801555020586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4299330977","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4766518,0.00045946697,0.501737,0.00762132,0.0008075982,0.0013048479,0.000047073718,0.00091350713,0.010457368],"genre_scores_gemma":[0.9665582,0.0006590654,0.03072743,0.0000088888055,0.000053059146,0.000302633,0.00031219388,0.000066366716,0.001312163],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964829,0.00082439376,0.0011642239,0.00067924,0.00041548294,0.0004337315],"domain_scores_gemma":[0.9951798,0.00028163256,0.00049868104,0.002399457,0.0014938525,0.0001465861],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0057428125,0.00042082378,0.00060193875,0.00036497344,0.00015224908,0.00018198504,0.0010282068,0.00066196395,0.00006946026],"category_scores_gemma":[0.0016281886,0.00049168494,0.00026398676,0.000258917,0.00019567307,0.00019564242,0.00073894893,0.0011674898,0.000003505482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017863332,0.0028557826,0.07567919,0.008396644,0.001170698,0.00073398865,0.01861301,0.21851519,0.063691236,0.28382194,0.018355899,0.30798778],"study_design_scores_gemma":[0.0016446459,0.0000031607342,0.049897734,0.00379491,0.00014751995,0.00045503734,0.00040790584,0.5946413,0.2861235,0.017655082,0.042921163,0.0023079943],"about_ca_topic_score_codex":0.0012732046,"about_ca_topic_score_gemma":0.00067554804,"teacher_disagreement_score":0.4899064,"about_ca_system_score_codex":0.0006362856,"about_ca_system_score_gemma":0.0005042435,"threshold_uncertainty_score":0.9997535},"labels":[],"label_agreement":null},{"id":"W4300156632","doi":"10.1007/978-3-031-02202-9_4","title":"Collaborative Work Enabled by Surfaces","year":2013,"lang":"en","type":"book-chapter","venue":"Synthesis lectures on human-centered informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Work (physics); Computer science; Engineering; Mechanical engineering","score_opus":0.014559620536993502,"score_gpt":0.21563941052588798,"score_spread":0.20107978998889448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300156632","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018745589,0.00097566255,0.00072398974,0.000040558614,0.00096161774,0.0007280605,0.00035501103,0.0006091642,0.9937314],"genre_scores_gemma":[0.5817524,0.0031633258,0.0026593388,0.001101113,0.0008161612,0.0005682472,0.0013010467,0.00074511307,0.40789324],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99811816,0.000027624432,0.00090109435,0.0001788859,0.00041849754,0.00035571016],"domain_scores_gemma":[0.99866855,0.00020846365,0.000336285,0.00047797014,0.00018872335,0.00011998836],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.000100928206,0.00069149485,0.0006117295,0.00029040745,0.00025409018,0.00031530537,0.00034241882,0.0006539314,0.004141205],"category_scores_gemma":[0.000039680282,0.0006067933,0.00017608014,0.000084997875,0.00012508596,0.00029207213,0.000030564104,0.00080396776,0.001156581],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063007035,0.00004149488,0.000006710453,0.0006533827,0.0012541796,0.000002763834,0.0032122626,0.005731352,0.00047032232,0.047418885,0.8933345,0.04781116],"study_design_scores_gemma":[0.00041793205,0.00011329576,0.000015226868,0.0013069988,0.00018392481,0.0000072079874,0.0004443835,0.0018865385,0.00883322,0.0035195919,0.98183465,0.0014370106],"about_ca_topic_score_codex":0.0000037395469,"about_ca_topic_score_gemma":0.000016218532,"teacher_disagreement_score":0.58583814,"about_ca_system_score_codex":0.00025306325,"about_ca_system_score_gemma":0.00003800817,"threshold_uncertainty_score":0.9996383},"labels":[],"label_agreement":null},{"id":"W4300962180","doi":"10.3389/fbuil.2022.980023","title":"Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective","year":2022,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; American University of Beirut","keywords":"Crew; Control (management); Productivity; Operations research; Computer science; Task (project management); Operations management; Engineering; Systems engineering; Aeronautics","score_opus":0.017068945532638307,"score_gpt":0.21938258641233394,"score_spread":0.20231364087969564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300962180","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97997457,0.0015338836,0.013901687,0.00014288198,0.001768358,0.0002193048,0.000032633234,0.00012674752,0.0022999519],"genre_scores_gemma":[0.99460036,0.000014816765,0.0049075275,0.0001073432,0.00008699832,0.0001561346,0.000069098925,0.000031267842,0.000026436557],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989115,0.000047291844,0.0002226998,0.00026848633,0.00030669096,0.0002433368],"domain_scores_gemma":[0.99958456,0.00004569022,0.000063930835,0.00022306941,0.0000058093888,0.00007696311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010503495,0.00018555266,0.00015449087,0.00018257688,0.00018963267,0.000026833763,0.00015650767,0.000058470487,0.00013077352],"category_scores_gemma":[0.000022707623,0.00021694589,0.00003584392,0.00017273423,0.00006181305,0.00011357284,0.000031218508,0.00043583568,0.000009893831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009289027,0.000024317911,0.06808941,0.000009087465,0.00003284156,0.0000044911326,0.0014687836,0.9253722,0.00032708037,0.000066553395,0.0022550067,0.0022573234],"study_design_scores_gemma":[0.0026113521,0.00039542228,0.1498225,0.0001642907,0.000038874117,0.0000028924126,0.014784384,0.8180818,0.0046518114,0.00060717313,0.0081923185,0.00064718205],"about_ca_topic_score_codex":0.00008367899,"about_ca_topic_score_gemma":0.0000019907643,"teacher_disagreement_score":0.10729042,"about_ca_system_score_codex":0.001544531,"about_ca_system_score_gemma":0.00003914719,"threshold_uncertainty_score":0.8846797},"labels":[],"label_agreement":null},{"id":"W4301423541","doi":"10.47893/ijatce.2012.1033","title":"EVALUATION OF DESIGN-BID-BUILD (D-B-B) PROJECTS WITH AND WITHOUT AGENCY CONSTRUCTION MANAGEMENT","year":2012,"lang":"en","type":"article","venue":"International Journal of Advanced Technology in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Integrated project delivery; Agency (philosophy); Schedule; Business; Pre-construction services; Construction management; Project management; Operations management; Design–build; Earned value management; Basis of estimate; Project charter; Project planning; Process management; Engineering; Computer science; Systems engineering; Civil engineering","score_opus":0.011855244730314688,"score_gpt":0.24917213533047397,"score_spread":0.23731689060015929,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4301423541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.805326,0.0013946844,0.19155747,0.000061068946,0.00093836227,0.00017923518,0.0000012029184,0.00006599722,0.00047597627],"genre_scores_gemma":[0.94598633,0.00025120663,0.053678166,0.0000017850876,0.000046776935,0.000020343101,5.7981293e-7,0.000012895152,0.0000018980267],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991037,0.0000136786675,0.00031893858,0.00006743439,0.00037403693,0.0001222069],"domain_scores_gemma":[0.99942636,0.000016581238,0.00012901514,0.00006943483,0.00033310291,0.000025506964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000427159,0.00010416128,0.00013985536,0.0008242699,0.000009085278,0.000007427817,0.000113221075,0.00007801982,0.000010493648],"category_scores_gemma":[0.000050815852,0.00009648964,0.000019552244,0.0002425586,0.00004590448,0.00038571967,0.00001498246,0.0001966069,3.804739e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006327362,0.000045950277,0.02340932,0.00005475565,0.0004105097,0.000006083843,0.0003086348,0.6001088,0.03364851,0.01352556,0.0000069774496,0.32841164],"study_design_scores_gemma":[0.014965367,0.0008081508,0.08596234,0.003747079,0.0008604763,0.0071565937,0.004175347,0.44822654,0.40466297,0.026221074,0.001752463,0.0014615936],"about_ca_topic_score_codex":5.955001e-7,"about_ca_topic_score_gemma":0.000004281964,"teacher_disagreement_score":0.37101445,"about_ca_system_score_codex":0.00017576021,"about_ca_system_score_gemma":0.000021029906,"threshold_uncertainty_score":0.39347333},"labels":[],"label_agreement":null},{"id":"W4303684799","doi":"10.1016/j.rineng.2022.100690","title":"Digital mock-ups as support tools for preventing risks related to energy sources in the operation stage of industrial facilities through design","year":2022,"lang":"en","type":"article","venue":"Results in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automation; Hazardous waste; Risk analysis (engineering); Product (mathematics); Systems engineering; Engineering; Computer science; Control (management); Software; Manufacturing engineering; Software engineering","score_opus":0.04682662701859045,"score_gpt":0.248593663783606,"score_spread":0.20176703676501556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4303684799","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88654935,0.00011697362,0.10719561,0.00007884528,0.000759536,0.00084643665,0.0004148544,0.00017704029,0.0038613423],"genre_scores_gemma":[0.9985783,0.000008532222,0.00048302652,0.0000055321243,0.000036440568,0.00024305037,0.00007173481,0.000016749622,0.0005566145],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999027,0.000034841247,0.0004597068,0.00013635248,0.00016700775,0.0001750791],"domain_scores_gemma":[0.9995665,0.00024013982,0.000038063718,0.00012303874,0.000016527656,0.000015735654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040351754,0.00011330024,0.00013629966,0.00014215673,0.00004913943,0.0000787955,0.00014323094,0.0000673679,0.000024324472],"category_scores_gemma":[0.00026207918,0.00010890459,0.00004101256,0.00029708783,0.000008384823,0.00037790855,0.000027926653,0.00021212776,7.7486476e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005079072,0.000009937097,0.0000611676,0.000019308374,0.000012303253,0.0000015808464,0.0036161828,0.98113066,0.00067328685,0.0022804576,0.00006604068,0.012078283],"study_design_scores_gemma":[0.0046843626,0.0007180189,0.00033225617,0.00020400403,0.000020717607,0.000045938283,0.030374354,0.82727104,0.041555885,0.0010333688,0.092899166,0.0008609074],"about_ca_topic_score_codex":0.00007958542,"about_ca_topic_score_gemma":0.000013332897,"teacher_disagreement_score":0.15385965,"about_ca_system_score_codex":0.00009950121,"about_ca_system_score_gemma":0.000029758463,"threshold_uncertainty_score":0.44410002},"labels":[],"label_agreement":null},{"id":"W4307850757","doi":"10.1139/cjce-2022-0041","title":"Assessing the assessor: a framework for BIM maturity, capacity, and competency evaluation at the organizational level","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Relevance (law); Building information modeling; Computer science; Process management; Software deployment; Maturity (psychological); Capability Maturity Model; Knowledge management; Management science; Engineering; Software engineering; Operations management; Software; Psychology","score_opus":0.029657031612407972,"score_gpt":0.24098432886138724,"score_spread":0.21132729724897925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307850757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4207636,0.005368074,0.56276256,0.0033083775,0.0058347574,0.0005409927,0.00014846608,0.000061016923,0.0012121536],"genre_scores_gemma":[0.99772996,0.000008543665,0.0019114293,0.000059841765,0.00022683333,0.000020896417,0.0000072130656,0.00002344006,0.000011828148],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992589,0.00003757709,0.0002388885,0.00006185212,0.00024680165,0.00015599978],"domain_scores_gemma":[0.9993492,0.00019689936,0.00007770215,0.00009258606,0.00018345735,0.00010017062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006333938,0.000093312454,0.00010307457,0.00013658659,0.0004883786,0.00017160492,0.00015680685,0.00004243212,0.0003997085],"category_scores_gemma":[0.00022140617,0.00007136197,0.000045661793,0.00023904929,0.00003391008,0.00018499893,0.000016059128,0.00038642748,5.4392376e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025257457,0.000005008249,0.0038928206,0.00006306396,0.00014582649,0.0000033507372,0.0013806612,0.8787037,0.0017271765,0.105522014,0.0036418044,0.004912013],"study_design_scores_gemma":[0.0007136858,0.000075376,0.036723983,0.00016894714,0.00023419871,0.0017552269,0.002608076,0.8703922,0.00085605634,0.04754842,0.038440123,0.0004836823],"about_ca_topic_score_codex":0.000057777568,"about_ca_topic_score_gemma":0.010635684,"teacher_disagreement_score":0.57696635,"about_ca_system_score_codex":0.00039415373,"about_ca_system_score_gemma":0.00033225812,"threshold_uncertainty_score":0.59349614},"labels":[],"label_agreement":null},{"id":"W4308565161","doi":"10.1061/(asce)co.1943-7862.0002393","title":"Optimizing Modularity of Prefabricated Residential Plumbing Systems for Construction in Remote Communities","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Prefabrication; Modular programming; Modularity (biology); Computer science; Sorting; Context (archaeology); Multi-objective optimization; Piping; Systems engineering; Civil engineering; Engineering; Mechanical engineering; Algorithm","score_opus":0.009266445138573484,"score_gpt":0.1945422077129463,"score_spread":0.18527576257437284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308565161","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45653242,0.0011900068,0.5390372,0.000028755674,0.00261544,0.00028388444,0.0000103707325,0.00006188137,0.00024002964],"genre_scores_gemma":[0.9635548,0.00057883206,0.035770275,0.0000020316509,0.000051966406,0.00001447149,0.000003699659,0.000013885213,0.000010022788],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999116,0.000033129163,0.0005158726,0.000059705628,0.00016599872,0.000109277666],"domain_scores_gemma":[0.9996024,0.000030010162,0.0001750803,0.00008578018,0.00007788172,0.000028877643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003321736,0.00009617095,0.00021346699,0.00050442596,0.00008108834,0.000032725504,0.000080121856,0.000034658864,0.0000065048457],"category_scores_gemma":[0.0000064080155,0.000113402406,0.000048871465,0.00019879619,0.000038744787,0.00016703737,0.00003090407,0.00021539874,3.9530015e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036798854,0.000007726827,0.00012330935,0.00039323425,0.00011372619,0.0000028600741,0.0002952299,0.96572614,0.0016994601,0.010054378,0.000040395844,0.021506751],"study_design_scores_gemma":[0.0016173457,0.00013340545,0.00076881296,0.00027907707,0.00011054647,0.0009577998,0.0100689735,0.9795696,0.0012764632,0.00066727825,0.004327522,0.00022317155],"about_ca_topic_score_codex":0.000052138566,"about_ca_topic_score_gemma":0.0000035493065,"teacher_disagreement_score":0.5070224,"about_ca_system_score_codex":0.000121941936,"about_ca_system_score_gemma":0.000010925228,"threshold_uncertainty_score":0.4624416},"labels":[],"label_agreement":null},{"id":"W4309582883","doi":"10.1007/978-3-031-20241-4_19","title":"Integrating Smart and Sustainable Construction: A Review of Present Status, and Possible Opportunities","year":2022,"lang":"en","type":"review","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Sustainability; Architectural engineering; Engineering; Risk analysis (engineering); Work (physics); Construction engineering; Environmental economics; Business","score_opus":0.022220260571815597,"score_gpt":0.24720293076119987,"score_spread":0.22498267018938428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309582883","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000086188875,0.98946875,0.008680763,0.000016728267,0.000335422,0.00046036846,0.000023842193,0.00012573841,0.00087978947],"genre_scores_gemma":[0.00020534248,0.99785995,0.0015343229,0.000010919214,0.00007382224,0.00018306628,0.00005708661,0.00005934816,0.000016127704],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985662,0.000055104712,0.0006224899,0.00024389,0.00016351351,0.0003488041],"domain_scores_gemma":[0.99923855,0.0003241995,0.00011760753,0.00020182042,0.000042686974,0.00007512649],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002726684,0.00038171152,0.0009974233,0.000413592,0.00005716739,0.000045610406,0.00009321184,0.00017822282,0.00020888081],"category_scores_gemma":[0.00021881035,0.00035786544,0.00010592603,0.00046833386,0.00006107056,0.00014113025,0.00009290922,0.00071657286,1.8983181e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.683063e-7,0.0000030062938,0.000013998894,0.16564542,0.00006494762,0.000009758624,0.00011986074,0.0010409605,7.432176e-7,0.002194548,0.00002798273,0.8308781],"study_design_scores_gemma":[0.00009180167,0.000027250397,0.000001938689,0.039588887,0.00017161088,0.00026355937,0.00015780644,0.002938838,0.000007447852,0.00020832791,0.9561621,0.00038043605],"about_ca_topic_score_codex":0.000053191947,"about_ca_topic_score_gemma":0.000039988714,"teacher_disagreement_score":0.95613414,"about_ca_system_score_codex":0.00018503435,"about_ca_system_score_gemma":0.00012126844,"threshold_uncertainty_score":0.99988735},"labels":[],"label_agreement":null},{"id":"W4309781265","doi":"10.1016/j.autcon.2022.104631","title":"Systematic search and mapping review of the concrete delivery problem (CDP): Formulations, objectives, and data","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Mitacs","keywords":"Computer science; Engineering; Information retrieval; Construction engineering; Data mining","score_opus":0.01617566056795186,"score_gpt":0.2368264143361466,"score_spread":0.22065075376819474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309781265","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9649231,0.023670318,0.0063070706,0.00040121487,0.00076834427,0.0023147182,0.00010080555,0.00023845125,0.0012759878],"genre_scores_gemma":[0.99554986,0.001535389,0.0027142176,0.00003314049,0.0000130231365,0.000101737256,0.00003510082,0.000008726455,0.000008791323],"study_design_codex":"systematic_review","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899584,0.00017271892,0.00042807191,0.0001413067,0.00018732491,0.000074760894],"domain_scores_gemma":[0.99950635,0.00007473521,0.000099277626,0.00024743658,0.000056783625,0.000015397372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005263988,0.00007691186,0.00016409512,0.00013023485,0.00015523208,0.000020308233,0.00010555829,0.000029630253,0.00003057933],"category_scores_gemma":[0.000045822268,0.00006816925,0.000017071034,0.00037407037,0.00007220649,0.00025701558,0.00010583,0.00014853613,5.116645e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038887585,0.000028894034,0.052045695,0.4258874,0.0006182656,0.0000028809995,0.007762504,0.02047837,0.014908765,0.1900243,0.0015551937,0.28664884],"study_design_scores_gemma":[0.00063250127,0.000027004186,0.016407378,0.016986508,0.0000929809,0.00061981316,0.0039480547,0.95826805,0.0004291887,0.00201685,0.00030248356,0.0002692156],"about_ca_topic_score_codex":0.00004662719,"about_ca_topic_score_gemma":0.000010867751,"teacher_disagreement_score":0.9377897,"about_ca_system_score_codex":0.00008008111,"about_ca_system_score_gemma":0.000038211165,"threshold_uncertainty_score":0.27798614},"labels":[],"label_agreement":null},{"id":"W4310191174","doi":"10.20944/preprints202211.0517.v1","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Software deployment; Bridge (graph theory); Productivity; Process (computing); Engineering; Plan (archaeology); Emerging technologies; Computer science; Engineering management; Knowledge management; Data science; Artificial intelligence; Software engineering","score_opus":0.11622924426170288,"score_gpt":0.3239801327102164,"score_spread":0.20775088844851353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310191174","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9735151,0.00006005779,0.020800987,0.00021374172,0.0023723096,0.0010762173,0.000056164412,0.00012835239,0.0017770592],"genre_scores_gemma":[0.99753165,0.00004196941,0.001260747,0.000008263457,0.00024639227,0.0007873388,0.000071977855,0.000022486729,0.000029199582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.998441,0.00012198569,0.0005963528,0.0004227356,0.00024161449,0.00017631624],"domain_scores_gemma":[0.9989899,0.00007232312,0.00019425314,0.0006124541,0.000106666324,0.000024422829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090991036,0.00020800566,0.00025892904,0.00020096464,0.00007448731,0.000018156788,0.00036650454,0.00041145776,0.0003796989],"category_scores_gemma":[0.00014714537,0.00020341469,0.00012794627,0.00027007482,0.00012805668,0.00010978053,0.00019460963,0.00162744,0.00001561833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020029578,0.00027999913,0.14795426,0.0010932708,0.00016761472,0.0000022798715,0.004030613,0.6403164,0.015774347,0.058675025,0.000059200105,0.13144666],"study_design_scores_gemma":[0.0004893539,0.00016099327,0.32332054,0.0006001059,0.00033259194,0.00013526452,0.019900689,0.11652476,0.32179752,0.20629019,0.008354543,0.0020934304],"about_ca_topic_score_codex":0.000053265077,"about_ca_topic_score_gemma":0.000033097072,"teacher_disagreement_score":0.5237917,"about_ca_system_score_codex":0.00017161238,"about_ca_system_score_gemma":0.0000950833,"threshold_uncertainty_score":0.82950103},"labels":[],"label_agreement":null},{"id":"W4310517097","doi":"10.1016/j.tws.2022.110364","title":"Experimental and numerical investigation of a novel vertically unconstrained steel inter-modular connection","year":2022,"lang":"en","type":"article","venue":"Thin-Walled Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Modular design; Structural engineering; Connection (principal bundle); Finite element method; Serviceability (structure); Engineering; Slip (aerodynamics); Computer science","score_opus":0.011135867796206428,"score_gpt":0.21660689132290523,"score_spread":0.2054710235266988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310517097","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9752003,0.0002012402,0.022868792,0.00006718856,0.0005916357,0.00015525814,0.000021224276,0.00015594992,0.0007383886],"genre_scores_gemma":[0.9975275,0.0000013166351,0.002266432,0.00006878019,0.000044944132,0.000033199572,0.000024107287,0.0000168071,0.000016953785],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99922705,0.000042458505,0.00026102146,0.00016043022,0.00019061806,0.00011843174],"domain_scores_gemma":[0.99970824,0.000033606193,0.00004859837,0.0001156769,0.000033332508,0.000060578783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007490452,0.00013507564,0.00016821105,0.00009614979,0.00011999226,0.000022662118,0.00008172129,0.00005726317,0.00034882704],"category_scores_gemma":[0.000019909037,0.0001343352,0.00004457597,0.00013266281,0.00010977548,0.00010313372,0.000044546836,0.0002208924,5.90091e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000087404325,0.000020928486,0.00042927518,0.000032383785,0.00008777502,0.0000014927224,0.0034028294,0.011198056,0.94351697,0.038481485,0.00017456192,0.002566842],"study_design_scores_gemma":[0.004668484,0.000731903,0.014018935,0.000040983334,0.000098042154,0.0004999727,0.013449717,0.44227523,0.50627327,0.016139742,0.0009688581,0.000834888],"about_ca_topic_score_codex":0.00003163046,"about_ca_topic_score_gemma":0.0000029398882,"teacher_disagreement_score":0.4372437,"about_ca_system_score_codex":0.00007913751,"about_ca_system_score_gemma":0.00002639597,"threshold_uncertainty_score":0.54780304},"labels":[],"label_agreement":null},{"id":"W4310806108","doi":"10.18280/rcma.320505","title":"Study the Ideal Proportions of Matrix, Reinforcing Materials and Additives to Obtain a Composite Material with High Tensile Strength","year":2022,"lang":"en","type":"article","venue":"Revue des composites et des matériaux avancés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sawdust; Materials science; Ultimate tensile strength; Composite material; Composite number; Polyester; Matrix (chemical analysis); Glass fiber; Polyester resin; Mass fraction; Unsaturated polyester; Chemistry","score_opus":0.020037874408624944,"score_gpt":0.24370261477941552,"score_spread":0.22366474037079057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310806108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99290776,0.0000748439,0.004097173,0.000055202505,0.0002492641,0.0008140486,0.0013659827,0.00017696735,0.00025877866],"genre_scores_gemma":[0.9838227,0.000017470189,0.0153382,0.00001749816,0.00007800885,0.00033662847,0.00024997187,0.000040710063,0.00009882285],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99882084,0.00015030507,0.00041640547,0.00021033728,0.00018726583,0.00021481568],"domain_scores_gemma":[0.99934804,0.00011545901,0.000119665834,0.0002433197,0.00010935232,0.00006416933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021295276,0.0002090039,0.00031853077,0.00014565371,0.00039883298,0.00013640961,0.00015633275,0.000029236875,0.0004962398],"category_scores_gemma":[0.000016216363,0.00015147547,0.00003324943,0.00025686872,0.0001341285,0.00016644412,0.000118404336,0.00014492522,0.000005358463],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014459345,0.0004535834,0.006022832,0.0011912109,0.0010655464,0.00015080415,0.01909902,0.36575243,0.55766594,0.030463941,0.0025173847,0.014171361],"study_design_scores_gemma":[0.0080992505,0.012722083,0.16497451,0.0023587535,0.0016689431,0.0074937274,0.050972953,0.042116806,0.6816368,0.007540376,0.016041346,0.004374422],"about_ca_topic_score_codex":0.0001404369,"about_ca_topic_score_gemma":0.00008406899,"teacher_disagreement_score":0.32363564,"about_ca_system_score_codex":0.00007798619,"about_ca_system_score_gemma":0.000023458539,"threshold_uncertainty_score":0.617699},"labels":[],"label_agreement":null},{"id":"W4310837982","doi":"10.1088/1755-1315/1101/1/011011","title":"Preface: CIB World Building Congress 2022","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Chemical Institute of Canada","funders":"","keywords":"Political science; Engineering; Library science; Public administration; Computer science","score_opus":0.0077308446427350516,"score_gpt":0.1863366629867707,"score_spread":0.17860581834403566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310837982","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99256265,0.00023370687,0.0001352083,0.00006249928,0.0007469433,0.00008833923,0.000037916863,0.00007367849,0.0060590617],"genre_scores_gemma":[0.99776965,0.00011340654,0.00030310894,0.000037572518,0.000019379651,0.000030630024,0.0000068697377,0.0000059049185,0.0017134615],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991643,0.0000135372775,0.00010833463,0.0002119773,0.00027798556,0.00022388356],"domain_scores_gemma":[0.99975055,0.0000070494025,0.000021615084,0.000118987766,0.000003890285,0.00009792622],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000115150775,0.00010001509,0.00007656978,0.00008655359,0.00055625907,0.00009968023,0.00016532581,0.000013553949,0.0021048367],"category_scores_gemma":[0.00000315577,0.000103423714,0.000015159066,0.00022941588,0.00055380963,0.0004896906,0.00013315155,0.00016300847,0.000008963661],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019054267,0.000018110148,0.003977743,0.000012915779,0.000009089895,0.000006771705,0.0006051986,0.004103434,0.85778177,0.018854616,0.00016546116,0.11444586],"study_design_scores_gemma":[0.00066014536,0.00029658095,0.08472707,0.00002562575,0.000019173658,0.00028479303,0.008377627,0.03587382,0.6256647,0.001400511,0.24170618,0.0009637334],"about_ca_topic_score_codex":0.000010394502,"about_ca_topic_score_gemma":0.00003321091,"teacher_disagreement_score":0.24154072,"about_ca_system_score_codex":0.000052190342,"about_ca_system_score_gemma":0.000023251412,"threshold_uncertainty_score":0.9988074},"labels":[],"label_agreement":null},{"id":"W4311168223","doi":"10.1088/1755-1315/1101/5/052015","title":"Sources of challenges for sustainability in the building design – The relationship between designers and clients","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Sustainability; Building information modeling; Scope (computer science); Process management; Business; Knowledge management; Design management; Sustainable design; Building design; Engineering; Architectural engineering; Computer science; Information management; Operations management","score_opus":0.037791763847122545,"score_gpt":0.22886447777208496,"score_spread":0.19107271392496242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311168223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99735653,0.00029888263,0.0016756596,0.00031070196,0.000027599659,0.00022491337,0.000008152746,0.000006840236,0.000090727335],"genre_scores_gemma":[0.999524,0.000079080724,0.00032081618,0.0000071814734,0.0000061342485,0.00005063654,0.000001021707,0.0000019478534,0.000009210664],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9994967,0.000055099877,0.000093176706,0.00010981133,0.00013299858,0.00011221525],"domain_scores_gemma":[0.9996832,0.0001927193,0.000022509788,0.000076755576,0.0000043701225,0.000020462454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058910734,0.000052027615,0.00005198387,0.00003337369,0.00038592707,0.000031887263,0.00012389377,0.000013315569,0.0000065675185],"category_scores_gemma":[0.000040050065,0.000035666042,0.000008806245,0.00009220068,0.0006306176,0.00017794735,0.000036910744,0.0000791886,5.9123252e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009580376,0.00004008875,0.55098957,0.0001312641,0.000013231192,0.0000012730732,0.03258331,0.013255472,0.014419097,0.15218058,0.000007350912,0.23628293],"study_design_scores_gemma":[0.00013136408,0.0001421413,0.9406908,0.000004864577,0.0000061188175,0.000012205605,0.039319713,0.0023508845,0.005399242,0.011537147,0.00032253747,0.000082960694],"about_ca_topic_score_codex":0.000010693961,"about_ca_topic_score_gemma":0.000010050823,"teacher_disagreement_score":0.38970122,"about_ca_system_score_codex":0.000023029706,"about_ca_system_score_gemma":0.000018726336,"threshold_uncertainty_score":0.2968278},"labels":[],"label_agreement":null},{"id":"W4312125615","doi":"10.3390/buildings12122185","title":"Case-Study: Fully Prefabricated Wood Wall Connection to Improve Building Envelope and On-Site Efficiency","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada; Ministère des Forêts, de la Faune et des Parcs","keywords":"Modular design; Joint (building); Engineering; Building envelope; Doors; Prefabrication; Elevator; Seal (emblem); Expansion joint; Structural engineering; Envelope (radar); Bridge (graph theory); Computer science; Thermal","score_opus":0.009013237547611304,"score_gpt":0.21319013644168183,"score_spread":0.20417689889407054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312125615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9931954,0.000048253376,0.004559593,0.00010605262,0.0006458574,0.0004427047,0.000011010069,0.0003847984,0.00060629676],"genre_scores_gemma":[0.99867636,0.0000028428256,0.00082014734,0.00012743867,0.000058268724,0.00017627848,0.000002827195,0.0000289574,0.000106908126],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990638,0.000029103874,0.00020912188,0.0003108828,0.00017749333,0.0002096242],"domain_scores_gemma":[0.9996452,0.00003528069,0.000037105605,0.0001567605,0.000041535746,0.00008415005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018463582,0.0001567523,0.00013446971,0.00021926763,0.00035376076,0.00007422091,0.00008778257,0.000039083057,0.000081749604],"category_scores_gemma":[0.000023471552,0.00016804972,0.000030483232,0.00045500766,0.000014374088,0.000098108496,0.00007019363,0.00023978308,0.000012827093],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019852075,0.00042138353,0.007036398,0.00010695731,0.00023001658,0.0005814264,0.018278364,0.06527673,0.5896162,0.009145119,0.0045786654,0.30453023],"study_design_scores_gemma":[0.0128732305,0.012186426,0.017156819,0.00021078745,0.00060955505,0.027111046,0.051537454,0.31743377,0.24160537,0.0015418655,0.3109639,0.006769765],"about_ca_topic_score_codex":0.00024486645,"about_ca_topic_score_gemma":0.000020324136,"teacher_disagreement_score":0.34801084,"about_ca_system_score_codex":0.00018455795,"about_ca_system_score_gemma":0.000015376902,"threshold_uncertainty_score":0.6852869},"labels":[],"label_agreement":null},{"id":"W4312787304","doi":"10.4236/ojce.2022.124028","title":"Integrating Universal Design Standards and Building Information Modeling at the Conceptual Design Stage of Buildings","year":2022,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Conceptual design; Process (computing); Systems engineering; Information model; Engineering; Conceptual model; Architecture; Novelty; Engineering design process; Plug-in; Population; Computer science; Software engineering; Construction engineering; Database; Human–computer interaction; Operations management","score_opus":0.01586291960788792,"score_gpt":0.21999081791928204,"score_spread":0.20412789831139413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312787304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07858976,0.0004242317,0.9201096,0.00002597685,0.00031128878,0.00015808556,0.000019181021,0.000021375088,0.00034048912],"genre_scores_gemma":[0.9752461,0.000057137586,0.024608977,0.0000093122635,0.00002905811,0.000007076277,0.0000011954525,0.000016655045,0.000024530038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894196,0.000057005727,0.00046140014,0.000056653935,0.00034786758,0.0001351061],"domain_scores_gemma":[0.9993845,0.0001235749,0.00018145544,0.00008296099,0.00017729605,0.000050199356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013642973,0.00012246885,0.00020017431,0.00016651975,0.0001803241,0.00010573796,0.00028765053,0.000031956388,0.00017565681],"category_scores_gemma":[0.00009266483,0.000103332524,0.00004643133,0.00020281736,0.000030912408,0.0010400245,0.00013464355,0.0003640918,1.5798912e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005181889,0.000002001582,0.000011294787,0.000019279221,0.000046664816,0.0000018049462,0.001609108,0.97684985,0.013135188,0.004089827,0.00021011279,0.0039730174],"study_design_scores_gemma":[0.0005131894,0.0001277394,0.0000035751668,0.000085664156,0.000024071212,0.0001368424,0.0049670017,0.9791389,0.0080800755,0.00007894117,0.0067183245,0.00012564166],"about_ca_topic_score_codex":0.00001486383,"about_ca_topic_score_gemma":0.000005584756,"teacher_disagreement_score":0.8966563,"about_ca_system_score_codex":0.00032491836,"about_ca_system_score_gemma":0.000099612065,"threshold_uncertainty_score":0.4213778},"labels":[],"label_agreement":null},{"id":"W4313072567","doi":"10.1051/shsconf/202214701002","title":"Les environnements communs de données (CDE) : définitions, historique et classification","year":2022,"lang":"fr","type":"article","venue":"SHS Web of Conferences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.056519712301231456,"score_gpt":0.2591617229863039,"score_spread":0.20264201068507245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313072567","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16157138,0.016454913,0.027710766,0.016056506,0.005720673,0.0005182502,0.00078079005,0.00027676465,0.77090997],"genre_scores_gemma":[0.99445826,0.0017808368,0.0014873185,0.000052131632,0.000081254584,0.00011894544,0.00012368993,0.000014042658,0.0018835209],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988069,0.00030403968,0.00035826923,0.00014470318,0.00021435121,0.00017174389],"domain_scores_gemma":[0.9994182,0.00011084654,0.00015241845,0.00020551878,0.000065434244,0.0000475836],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00030375068,0.0001456257,0.00017355083,0.00013522425,0.00028065647,0.000037100872,0.00023471954,0.00010059169,0.006256088],"category_scores_gemma":[0.000022041027,0.00017442284,0.000076787925,0.00013347539,0.00019748256,0.00015198471,0.00004797456,0.00039884954,0.00001730098],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012051581,0.00008737315,0.008968781,0.000077026365,0.00005368748,7.271245e-7,0.0007727782,0.0007749465,0.004901399,0.9318698,0.0021348614,0.050346565],"study_design_scores_gemma":[0.0002854664,0.000121027915,0.016127627,0.000088881476,0.00005702317,0.000014810972,0.007313948,0.0130984085,0.0014511085,0.009142035,0.952086,0.00021371874],"about_ca_topic_score_codex":0.004746633,"about_ca_topic_score_gemma":0.0013192758,"teacher_disagreement_score":0.9499511,"about_ca_system_score_codex":0.00034232566,"about_ca_system_score_gemma":0.0019468273,"threshold_uncertainty_score":0.99465233},"labels":[],"label_agreement":null},{"id":"W4313170065","doi":"10.2139/ssrn.4234625","title":"An Integrated Framework for Vr-Based Collaborative Design Support System for Consensus-Building in Built Environment Design","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Collaborative design; Computer science; Systems engineering; Human–computer interaction; Engineering; Systems design","score_opus":0.013973172728593747,"score_gpt":0.24250396683070005,"score_spread":0.2285307941021063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313170065","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014464604,0.0005121817,0.9832455,0.00009852056,0.00046513721,0.0010403361,0.0000518555,0.00010812987,0.000013766049],"genre_scores_gemma":[0.90020424,0.000052507967,0.09882085,0.000029438586,0.000100381505,0.0006893463,0.000023423274,0.00005305498,0.000026781256],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99780154,0.00026239618,0.0004305794,0.0002157184,0.00019657526,0.0010931592],"domain_scores_gemma":[0.9992639,0.00030677294,0.00013433085,0.0001420692,0.000079814236,0.00007313989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020425112,0.00020759793,0.00024023732,0.00023565184,0.0003743167,0.00006295643,0.00019958681,0.00010768401,0.000045167886],"category_scores_gemma":[0.00004746801,0.0002123306,0.00008316232,0.000284718,0.000030403638,0.000090572576,0.0000066778994,0.0011658639,0.0000016286466],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071018003,0.00006234024,0.00007460694,0.000029465107,0.00014846606,0.0000043281643,0.0002889979,0.85988253,0.0070144203,0.10673217,0.00021148824,0.02484101],"study_design_scores_gemma":[0.0037591574,0.004201603,0.000021357055,0.00009913837,0.00013564271,0.0005130504,0.02939531,0.8066416,0.024937604,0.12260907,0.0069082445,0.0007782133],"about_ca_topic_score_codex":0.000008891333,"about_ca_topic_score_gemma":0.000032569464,"teacher_disagreement_score":0.8857396,"about_ca_system_score_codex":0.0036094403,"about_ca_system_score_gemma":0.0015510829,"threshold_uncertainty_score":0.9438561},"labels":[],"label_agreement":null},{"id":"W4313201678","doi":"10.1016/j.cscm.2022.e01755","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2022,"lang":"en","type":"article","venue":"Case Studies in Construction Materials","topic":"BIM and Construction Integration","field":"Engineering","cited_by":96,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Abbott (Canada)","funders":"King Khalid University; Najran University; Deanship of Scientific Research, King Faisal University","keywords":"Building information modeling; Energy consumption; Sustainability; Environmental economics; Energy management; Energy modeling; Consumption (sociology); Efficient energy use; Engineering; Green building; Civil engineering; Energy (signal processing); Architectural engineering; Environmental resource management; Operations management; Environmental science; Economics","score_opus":0.02881465003547695,"score_gpt":0.2713294658113661,"score_spread":0.24251481577588913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313201678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9618066,0.0005042963,0.035607025,0.000006766171,0.0016746775,0.00017076293,0.000052998963,0.00012755112,0.000049322807],"genre_scores_gemma":[0.9916073,0.000064470885,0.008080627,0.000017664543,0.000061456565,0.00013152957,0.0000142969775,0.00001805015,0.0000046096943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988113,0.00022588111,0.00045318957,0.00024831234,0.00012280053,0.00013848653],"domain_scores_gemma":[0.9995706,0.000054490643,0.00009494823,0.00016235825,0.000085216285,0.000032358064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022873106,0.0001740891,0.00034366763,0.00069179205,0.00039695774,0.00006399884,0.00003276507,0.0000434385,0.00038984974],"category_scores_gemma":[0.000022226504,0.00018631766,0.000039634273,0.0009736453,0.00015320188,0.00015640457,0.00006058464,0.00007845034,2.4440277e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003123276,0.00003290691,0.0032476224,0.00004897858,0.00068539556,0.0049775816,0.0010644185,0.98307383,0.0013103893,0.00088465604,0.000018946295,0.004624045],"study_design_scores_gemma":[0.0040799235,0.000272137,0.000097359,0.00005355828,0.0024682109,0.1370132,0.18324788,0.65182537,0.018188804,0.0007066973,0.0005853926,0.0014614718],"about_ca_topic_score_codex":0.0003254304,"about_ca_topic_score_gemma":0.00028375088,"teacher_disagreement_score":0.33124846,"about_ca_system_score_codex":0.00019673981,"about_ca_system_score_gemma":0.00002000127,"threshold_uncertainty_score":0.75978136},"labels":[],"label_agreement":null},{"id":"W4313259820","doi":"10.3390/su15010201","title":"Health and Safety Improvement through Industrial Revolution 4.0: Malaysian Construction Industry Case","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Yayasan UTP; Universiti Teknologi Petronas","keywords":"Analytic hierarchy process; Engineering; Process (computing); Construction engineering; Building information modeling; Risk analysis (engineering); Occupational safety and health; Construction industry; Industry 4.0; Automation; Engineering management; Construction site safety; Transport engineering; Computer science; Operations management; Operations research; Business","score_opus":0.010202073993809223,"score_gpt":0.2381080489969394,"score_spread":0.22790597500313017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313259820","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9911078,0.00031687628,0.0035982192,0.0022477908,0.0010924593,0.00075859623,0.00006793755,0.00026977624,0.00054051855],"genre_scores_gemma":[0.99929404,0.000017527245,0.00026763394,0.00007670176,0.00013135505,0.000111833535,0.000029332026,0.000012602532,0.00005895896],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99887264,0.00013311951,0.000348598,0.00024089888,0.0001525292,0.00025220186],"domain_scores_gemma":[0.9994886,0.00002003274,0.000068867565,0.00021289037,0.000108173495,0.00010143701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003726265,0.00013202071,0.00016271138,0.000063023464,0.0005353086,0.000026054067,0.000046762925,0.00014193794,0.00014187925],"category_scores_gemma":[0.00007407236,0.00014899977,0.00003875843,0.00028932394,0.00012329014,0.00021349327,0.0000654717,0.0008034693,4.966694e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002626497,0.00009383191,0.047111206,0.00036335207,0.000076484066,0.00008357639,0.0031423455,0.00858293,0.000054468564,0.07830048,0.0050697504,0.8568589],"study_design_scores_gemma":[0.010295748,0.0031956336,0.013184585,0.000061683975,0.0001475843,0.017747918,0.3828896,0.03650449,0.0008562131,0.17154817,0.36097905,0.0025893268],"about_ca_topic_score_codex":0.0006819712,"about_ca_topic_score_gemma":0.000047158526,"teacher_disagreement_score":0.8542696,"about_ca_system_score_codex":0.002613789,"about_ca_system_score_gemma":0.00039357308,"threshold_uncertainty_score":0.6834967},"labels":[],"label_agreement":null},{"id":"W4313293271","doi":"10.3233/atde220925","title":"Construction-Oriented Architectural Design in Off-Site Construction Towards Lean Construction and Management","year":2022,"lang":"en","type":"book-chapter","venue":"Advances in transdisciplinary engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; Nanjing Tech University; China Postdoctoral Science Foundation; University of British Columbia; National Natural Science Foundation of China","keywords":"Lean project management; Lean construction; Lean manufacturing; Engineering; Architecture; Lean software development; Design thinking; Process management; Design management; Manufacturing engineering; Systems engineering; Knowledge management; Computer science; Construction engineering; Construction industry; Mechanical engineering; Information management","score_opus":0.006195285989473222,"score_gpt":0.20401848933230177,"score_spread":0.19782320334282855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313293271","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057094797,0.055237763,0.557204,0.0002642214,0.020666502,0.0055725323,0.00062140747,0.0031014364,0.30023733],"genre_scores_gemma":[0.334839,0.15823622,0.4953682,0.000043236258,0.0012840979,0.0018190199,0.0012315689,0.0011961625,0.0059824795],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99782753,0.000022798928,0.0007953641,0.00061120634,0.00032984736,0.00041323475],"domain_scores_gemma":[0.9994317,0.000065042346,0.000103594546,0.00027211857,0.00002985562,0.00009764197],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017383348,0.000624656,0.0005598026,0.0011378053,0.000118287586,0.0000356878,0.00014895243,0.0002699298,0.0002468408],"category_scores_gemma":[0.0000043027826,0.00075044425,0.00011773115,0.0002909698,0.00027211703,0.0005992623,0.000059280992,0.0010630015,0.00000454097],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010012238,0.000009092244,0.00016331827,0.00064460136,0.00008525202,0.00008587883,0.00095158606,0.4743908,0.00011454099,0.15213624,0.000004677146,0.3713139],"study_design_scores_gemma":[0.014141675,0.0012321689,0.0042252587,0.008487792,0.00096605974,0.013105194,0.011697039,0.45757428,0.0021136259,0.118539274,0.35634756,0.011570078],"about_ca_topic_score_codex":0.0000051970023,"about_ca_topic_score_gemma":0.00007988585,"teacher_disagreement_score":0.35974383,"about_ca_system_score_codex":0.00045405695,"about_ca_system_score_gemma":0.00002969056,"threshold_uncertainty_score":0.9994947},"labels":[],"label_agreement":null},{"id":"W4313891040","doi":"10.3390/buildings13010163","title":"Digital Technologies in Offsite and Prefabricated Construction: Theories and Applications","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; New Brunswick Innovation Foundation","keywords":"Emerging technologies; Current (fluid); Focus (optics); Computer science; Prefabrication; Architectural engineering; Digital transformation; Construction engineering; Construction industry; Systems engineering; Engineering; Manufacturing engineering; Civil engineering; World Wide Web; Artificial intelligence","score_opus":0.004467769802596306,"score_gpt":0.19266715991674035,"score_spread":0.18819939011414405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313891040","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9779133,0.00072351104,0.010056581,0.00047509623,0.000101942656,0.00022629034,0.000019445712,0.0024118552,0.008071939],"genre_scores_gemma":[0.9991445,0.0002613054,0.00042136147,0.0000023116345,0.000013379001,0.00006358445,0.000005505876,0.0000063063444,0.00008173581],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997166,0.0000015852653,0.000082918195,0.00009298855,0.000031833308,0.00007408415],"domain_scores_gemma":[0.9998872,0.000020200121,0.000010538774,0.000058128862,0.000012342935,0.000011560212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000024551971,0.00005587996,0.000057654343,0.000133594,0.00003824985,0.00006263305,0.000029798795,0.000052387328,0.0000025298407],"category_scores_gemma":[0.000010383038,0.000054013024,0.0000064518285,0.0003673014,0.0001356683,0.00015899484,0.000021120108,0.00006482553,0.0000068740737],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002715541,0.0000022789422,0.03358364,0.000033336266,0.000010527528,7.1324394e-7,0.0001523218,0.0000663905,0.0025930211,0.24968591,0.00022192729,0.7136472],"study_design_scores_gemma":[0.0014297661,0.000072286304,0.060783193,0.00018211306,0.000039723636,0.00053023,0.020040117,0.019009558,0.02767692,0.558565,0.3105073,0.0011637746],"about_ca_topic_score_codex":0.0000015518514,"about_ca_topic_score_gemma":0.0000021106482,"teacher_disagreement_score":0.71248347,"about_ca_system_score_codex":0.000010843313,"about_ca_system_score_gemma":0.0000030702065,"threshold_uncertainty_score":0.22025873},"labels":[],"label_agreement":null},{"id":"W4317401357","doi":"10.18280/mmep.090611","title":"Managing Cost and Schedule Evaluation of a Construction Project via BIM Technology and Experts’ Points of View","year":2022,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Project management; Building information modeling; Software; Computer science; Software project management; Cost estimate; Project planning; Construction management; Engineering management; Pre-construction services; Resource (disambiguation); Facility management; Reliability (semiconductor); Construction engineering; Systems engineering; Operations research; Engineering; Operations management; Scheduling (production processes); Software development; Civil engineering; Business; Software construction","score_opus":0.02750985608775005,"score_gpt":0.23084212891141928,"score_spread":0.20333227282366922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317401357","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35134408,0.0016390956,0.64646304,0.000036944315,0.000055531393,0.0002731527,0.0000027159638,0.00008606346,0.0000993777],"genre_scores_gemma":[0.97084194,0.00017202995,0.02882005,0.0000012783559,0.000006273641,0.00013859039,0.0000021166045,0.000015693904,0.000002047625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932927,0.000015368183,0.0002668961,0.0001241889,0.00015871126,0.00010558272],"domain_scores_gemma":[0.9997722,0.000028184302,0.000041127238,0.00008563256,0.00004842348,0.000024437444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003520737,0.00010301774,0.00019226597,0.00027626724,0.000049670965,0.000011484556,0.0000323254,0.00005116876,0.000010840621],"category_scores_gemma":[0.000013469139,0.000103109145,0.00001586244,0.00022125561,0.00006140228,0.00006633404,0.000032203297,0.00011775719,1.3168288e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000038720773,0.000017488303,0.000051289266,0.0012649964,0.000043888787,1.8025074e-7,0.0006944653,0.8804982,0.004996785,0.0613808,0.0000016037164,0.051046476],"study_design_scores_gemma":[0.00022865676,0.00003244997,0.0000026697292,0.00016084262,0.000039364713,0.00009209942,0.00034774083,0.95598704,0.0013549238,0.041612197,0.000050207702,0.00009180333],"about_ca_topic_score_codex":0.000003589413,"about_ca_topic_score_gemma":2.2112386e-7,"teacher_disagreement_score":0.61949784,"about_ca_system_score_codex":0.000024567256,"about_ca_system_score_gemma":0.000008348784,"threshold_uncertainty_score":0.42046687},"labels":[],"label_agreement":null},{"id":"W4317792690","doi":"10.1109/wsc57314.2022.10015308","title":"Accelerating Training of Reinforcement Learning-Based Construction Robots in Simulation Using Demonstrations Collected in Virtual Reality","year":2022,"lang":"en","type":"article","venue":"2022 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reinforcement learning; Robot; Computer science; Flexibility (engineering); Task (project management); Economic shortage; Human–computer interaction; Virtual reality; Artificial intelligence; Simulation; Engineering; Systems engineering","score_opus":0.07354045546339771,"score_gpt":0.2889406442721747,"score_spread":0.21540018880877698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317792690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5391621,0.000008715193,0.45930886,0.00002408065,0.00032028146,0.00031172257,0.000010324729,0.0000963338,0.00075757754],"genre_scores_gemma":[0.9989195,0.0000014227447,0.0007875831,0.000017583141,0.00003310364,0.000059614096,0.0001270957,0.000020586678,0.000033548957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980439,0.00025039047,0.00088102254,0.00026170572,0.0003378147,0.00022517506],"domain_scores_gemma":[0.9991841,0.0002225758,0.00022753565,0.00015197646,0.00017224996,0.000041561343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000364795,0.00018887105,0.0002740278,0.0005858212,0.00021316585,0.000056742196,0.00010822444,0.00009688191,0.00089971535],"category_scores_gemma":[0.00012306448,0.00024304871,0.00006506955,0.0009495609,0.0000611698,0.00038293542,0.000032884276,0.00050757104,0.000001135362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059556965,0.000022826118,0.0056140805,0.000016920572,0.000013197697,0.0000012049205,0.0017515549,0.9803773,0.0029569548,0.00088687555,0.000002415159,0.008297094],"study_design_scores_gemma":[0.0009536325,0.000093555,0.0038656315,0.0000633281,0.000011759113,0.0000029302919,0.003225868,0.99078244,0.00059461955,0.00014032063,0.00005790439,0.00020802357],"about_ca_topic_score_codex":0.000119521246,"about_ca_topic_score_gemma":0.000559251,"teacher_disagreement_score":0.45975736,"about_ca_system_score_codex":0.00048274218,"about_ca_system_score_gemma":0.00024021653,"threshold_uncertainty_score":0.99112386},"labels":[],"label_agreement":null},{"id":"W4318339150","doi":"10.31586/wjcea.2023.569","title":"A framework for the evaluation of the decision between onsite and offsite construction using life cycle analysis (LCA) concepts and system dynamics modeling","year":2023,"lang":"en","type":"article","venue":"Trends journal of sciences research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Factory (object-oriented programming); Transport engineering; Engineering; Yard; Construction management; Civil engineering; Construction engineering; Computer science","score_opus":0.2048095338506021,"score_gpt":0.4577149916723511,"score_spread":0.252905457821749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318339150","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8186878,0.00041892138,0.18051867,0.00011719684,0.0001419192,0.000065653854,0.000008238765,0.0000068392783,0.000034754827],"genre_scores_gemma":[0.99548584,0.00008613752,0.0043455604,9.629914e-7,0.00007295186,0.0000025019106,4.872695e-7,0.000003630536,0.000001923798],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838006,0.00014313687,0.00030885433,0.000093727474,0.0009404461,0.00013374854],"domain_scores_gemma":[0.9985378,0.0006612965,0.000108928754,0.00008026736,0.00056382274,0.000047930665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004839783,0.000053437914,0.0001467998,0.000666659,0.0004489015,0.00011268144,0.00015454291,0.00005511006,0.000003860442],"category_scores_gemma":[0.00030479545,0.000030838848,0.00006802729,0.0025783563,0.0003916247,0.00023680036,0.000034448527,0.00021115645,1.2660702e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001074043,0.0000011653541,0.009110331,0.000015861937,0.00010478078,6.0045835e-8,0.00038801288,0.7479956,0.00014611943,0.0031078602,0.0000037972868,0.23911566],"study_design_scores_gemma":[0.00014331283,0.000026336218,0.011955442,0.00010989781,0.00020886741,0.000012945868,0.0052532996,0.9783587,0.000050615174,0.0038482395,0.0000020476898,0.000030287565],"about_ca_topic_score_codex":0.000027425765,"about_ca_topic_score_gemma":0.000039381383,"teacher_disagreement_score":0.23908536,"about_ca_system_score_codex":0.00009086921,"about_ca_system_score_gemma":0.00008228059,"threshold_uncertainty_score":0.34526327},"labels":[],"label_agreement":null},{"id":"W4318474275","doi":"10.3311/ccc2022-019","title":"Clash Avoidance in BIM Based Multidisciplinary Coordination: A Literature Overview","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Multidisciplinary approach; Process (computing); Inefficiency; Computer science; Documentation; Situation awareness; Process management; Knowledge management; Principal (computer security); Situational ethics; Work (physics); Risk analysis (engineering); Systems engineering; Engineering; Business; Computer security; Political science","score_opus":0.010461600647491978,"score_gpt":0.22530862375404528,"score_spread":0.2148470231065533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318474275","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8418485,0.016955888,0.05777452,0.0049736365,0.004530901,0.0010065562,0.00015718216,0.0018578705,0.070894934],"genre_scores_gemma":[0.997761,0.00002229138,0.0013045853,0.000106997875,0.00003312227,0.000117642754,0.00003681769,0.000010256709,0.00060728943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995504,0.000030855932,0.00012705021,0.0001008793,0.00010362523,0.00008716726],"domain_scores_gemma":[0.9998269,0.000020047237,0.000011957159,0.00010142625,0.000020255242,0.000019383178],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000076740536,0.00007240206,0.000069810616,0.000113572285,0.00007350649,0.000024040732,0.00006633944,0.000031892327,0.0009181086],"category_scores_gemma":[0.000004165759,0.00007262826,0.000032047006,0.00050258817,0.000008446735,0.000116757416,0.000020796077,0.00022229813,0.000011981428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069870934,0.00017888588,0.017520448,0.0005048695,0.000037506226,0.00006953469,0.002877934,0.5766619,0.00688516,0.28280267,0.025942475,0.08644876],"study_design_scores_gemma":[0.00075037836,0.0000402472,0.0070481002,0.00007065713,0.0000040465484,0.000027104817,0.0005808693,0.94759953,0.00078522984,0.002800029,0.040039938,0.00025388782],"about_ca_topic_score_codex":0.000004610341,"about_ca_topic_score_gemma":0.00004371719,"teacher_disagreement_score":0.37093762,"about_ca_system_score_codex":0.000096979646,"about_ca_system_score_gemma":0.00001596536,"threshold_uncertainty_score":0.9999952},"labels":[],"label_agreement":null},{"id":"W4318474430","doi":"10.3311/ccc2022-032","title":"Chronographical Modelling for Repetitive Project","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Gantt chart; Schedule; Computer science; Resource (disambiguation); Project management; Industrial engineering; Operations research; Work (physics); Sequence (biology); Linear programming; Systems engineering; Construction engineering; Engineering; Algorithm","score_opus":0.018164692871136544,"score_gpt":0.21824276633803988,"score_spread":0.20007807346690334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318474430","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019777795,0.00006458263,0.9512801,0.00005170819,0.0003839494,0.0002023531,0.0000150715205,0.00031057934,0.027913824],"genre_scores_gemma":[0.99149567,0.000007887742,0.007642603,0.000029457124,0.00005635416,0.00033806943,0.000014344603,0.000009148823,0.0004064756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997658,0.000004647956,0.00006202669,0.000059934675,0.000045446865,0.000062151266],"domain_scores_gemma":[0.99991935,0.000010664864,0.000004779501,0.00004324302,0.000013521678,0.000008413845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000039673927,0.0000339132,0.00003399375,0.000051349787,0.00008260332,0.000008031958,0.000027018179,0.000012688143,0.00019955398],"category_scores_gemma":[0.0000010160203,0.000033446646,0.000035233494,0.00009350002,0.0000074528266,0.00003378129,0.0000057727584,0.00006551656,0.0000012019752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025972968,0.000016970656,0.00010338566,0.000028379454,0.000045396693,5.7725606e-7,0.00039278518,0.6490343,0.00076822285,0.31268734,0.010317449,0.026579209],"study_design_scores_gemma":[0.00010551731,0.00003147967,0.0000047475587,0.0000010220891,0.0000037349278,0.000006905218,0.0004369355,0.9204754,0.00067654153,0.0016925989,0.07650532,0.00005979323],"about_ca_topic_score_codex":0.000008914003,"about_ca_topic_score_gemma":0.0000037634984,"teacher_disagreement_score":0.97171783,"about_ca_system_score_codex":0.000025492544,"about_ca_system_score_gemma":0.00000921671,"threshold_uncertainty_score":0.2184976},"labels":[],"label_agreement":null},{"id":"W4318618521","doi":"10.1007/978-3-031-25182-5_44","title":"The Importance of Preparing Customized TRIZ Matrix to Accelerate the Innovation for Design Buildings","year":2023,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"TRIZ; Architectural engineering; Matrix (chemical analysis); Engineering; Manufacturing engineering; Computer science; Materials science; Composite material","score_opus":0.015179267836863394,"score_gpt":0.26889710399927186,"score_spread":0.25371783616240845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318618521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025087767,0.025114426,0.77379644,0.008365777,0.0017284736,0.008676334,0.00011373826,0.0024210766,0.17727494],"genre_scores_gemma":[0.46595255,0.33008575,0.14777389,0.0014181582,0.00021978661,0.012456258,0.00096395204,0.00040533431,0.040724326],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988468,0.000013436358,0.00083802635,0.00008292437,0.00010071218,0.00011806025],"domain_scores_gemma":[0.99851036,0.00029718512,0.00039798766,0.0005094789,0.00027461833,0.00001037873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005682637,0.00014903829,0.00019727439,0.0005509294,0.00019556154,0.000056223085,0.0004497662,0.00024331894,0.0000037206783],"category_scores_gemma":[0.0001795448,0.00011189535,0.000028996083,0.00041781785,0.00015730021,0.0005050153,0.00008467473,0.00031221224,0.000008572859],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003845229,7.8024794e-7,0.000010487508,0.000040031893,0.000012278214,8.115186e-9,0.00014781783,0.002737347,0.000031299598,0.7388863,0.00043977555,0.2576554],"study_design_scores_gemma":[0.0004966023,0.000037763504,0.000010410334,0.0001708176,0.000014061482,0.00000472887,0.0005624778,0.012579352,0.0011583186,0.28645143,0.69832766,0.00018636454],"about_ca_topic_score_codex":0.0000014450992,"about_ca_topic_score_gemma":0.000061445295,"teacher_disagreement_score":0.6978879,"about_ca_system_score_codex":0.00007417532,"about_ca_system_score_gemma":0.000028999435,"threshold_uncertainty_score":0.456296},"labels":[],"label_agreement":null},{"id":"W4318943137","doi":"10.37256/dmt.3120231856","title":"Building Information Modeling (BIM) and Robotic Manufacturing Technological Interoperability in Construction – A Cyclic Systematic Literature Review","year":2023,"lang":"en","type":"article","venue":"Digital Manufacturing Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Mitacs","keywords":"Interoperability; Building information modeling; Operationalization; Engineering; Bridge (graph theory); Systems engineering; Information model; Manufacturing engineering; Computer science; Engineering management; Knowledge management; Software engineering; Operations management; World Wide Web","score_opus":0.007623162048467395,"score_gpt":0.20685296142738654,"score_spread":0.19922979937891916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318943137","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9661123,0.004223381,0.024522126,0.00037386245,0.000295943,0.0007588484,0.000009679449,0.0033366866,0.00036714587],"genre_scores_gemma":[0.9954987,0.0032467004,0.0010130553,0.000026467995,0.000011894924,0.00015257465,0.000027716187,0.000018909766,0.000003942089],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858034,0.000020797981,0.0006604609,0.0002654101,0.00013966898,0.00033330888],"domain_scores_gemma":[0.99948514,0.000040675885,0.00007672329,0.00032170105,0.000032808734,0.000042960703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001951133,0.000270597,0.0004441228,0.001117546,0.000070672504,0.00021424945,0.0002056509,0.0003643131,0.0000040956447],"category_scores_gemma":[0.00017009584,0.0002381589,0.000059707978,0.00060979347,0.00013131501,0.0011975674,0.00013298371,0.0005931403,0.000037741862],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025288491,0.000038157254,0.0011174772,0.13427186,0.00016530047,0.00008627973,0.0002765295,0.06627157,0.00097486895,0.045575395,0.00005679478,0.7511405],"study_design_scores_gemma":[0.0017372076,0.00019101833,0.001599519,0.168031,0.00016608399,0.0044504376,0.003142026,0.52083653,0.0819375,0.21439216,0.000834281,0.0026822325],"about_ca_topic_score_codex":0.0000014494706,"about_ca_topic_score_gemma":0.0000032177425,"teacher_disagreement_score":0.74845827,"about_ca_system_score_codex":0.00014445774,"about_ca_system_score_gemma":0.0000062268773,"threshold_uncertainty_score":0.97118384},"labels":[],"label_agreement":null},{"id":"W4319157507","doi":"10.2138/gselements.18.5.291","title":"On the Path to Decarbonisation","year":2022,"lang":"en","type":"article","venue":"Elements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"LafargeHolcim (Canada)","funders":"","keywords":"Cement; Focus (optics); Architectural engineering; Key (lock); Sky; Embodied cognition; Path (computing); Civil engineering; Environmental science; Engineering; Computer science; Materials science; Geography; Meteorology; Composite material; Artificial intelligence; Physics","score_opus":0.008473131760718173,"score_gpt":0.20309224356545566,"score_spread":0.19461911180473748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319157507","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9788897,0.000010442061,0.0016449335,0.0004111973,0.00069605745,0.00012707467,0.0000075025173,0.00008060879,0.01813247],"genre_scores_gemma":[0.99928164,4.8813405e-7,0.000071016475,0.00032734638,0.0000230714,0.00009854509,0.0000049386854,0.0000043722894,0.00018857513],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999752,0.000011279019,0.000052259846,0.00003625922,0.00010046615,0.000047755788],"domain_scores_gemma":[0.9999088,0.000007902626,0.0000056868,0.00006301919,0.0000043275027,0.000010257328],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00005720932,0.000026677968,0.000016168777,0.000020076468,0.000090055495,0.000009149004,0.00004315001,0.0000042106253,0.00092972326],"category_scores_gemma":[0.0000036904473,0.00002115154,0.00000891487,0.00006895665,0.0000016560492,0.0000123608825,0.000009936198,0.000049592647,0.000052447645],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003098341,0.00005824684,0.0048233736,0.000011054752,0.00008768715,0.0000030131243,0.0025046638,0.047929954,0.014633122,0.452457,0.23012042,0.24734047],"study_design_scores_gemma":[0.0007916386,0.00041765117,0.015579333,0.000018683666,0.000020577541,0.0000107306,0.0028138752,0.07686841,0.016825488,0.024245352,0.86191654,0.0004916975],"about_ca_topic_score_codex":0.0000027002895,"about_ca_topic_score_gemma":0.0000023365246,"teacher_disagreement_score":0.6317961,"about_ca_system_score_codex":0.000053242176,"about_ca_system_score_gemma":0.0000028284703,"threshold_uncertainty_score":0.99998355},"labels":[],"label_agreement":null},{"id":"W4319653543","doi":"","title":"THE USE OF COMPUTER DYNAMIC SHAPING FOR MODELING OF ENGINEERING STRUCTURES AND BUILDINGS","year":2017,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill-Queen's University Press","funders":"","keywords":"Computer science; Computer modelling; Architectural engineering; Engineering; Software engineering; Computer software","score_opus":0.20719038561092676,"score_gpt":0.45905389232515675,"score_spread":0.25186350671422997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319653543","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78100276,0.003683594,0.21437868,0.000026044589,0.00061030616,0.00020911486,0.000023337167,0.000021308497,0.000044877186],"genre_scores_gemma":[0.9900077,0.002274418,0.007602932,0.000008336487,0.00006152893,0.00001014216,0.000001632861,0.000026536583,0.0000067503925],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906135,0.000014015713,0.00048208036,0.00012833458,0.00016695324,0.0001472641],"domain_scores_gemma":[0.998975,0.00016793211,0.00033802763,0.0002710632,0.000196392,0.0000516105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026933558,0.00014625728,0.00032339914,0.00020176591,0.0002327352,0.0007879117,0.00078187627,0.000065495995,0.000040505787],"category_scores_gemma":[0.000110226945,0.00011693749,0.0000878537,0.00007664186,0.00007649385,0.001339027,0.00018597211,0.00015310805,6.48012e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007096437,0.00001129067,0.0128065245,0.00037131147,0.00031097519,7.8281005e-7,0.00018756918,0.70161724,0.15077004,0.002539757,0.00081514305,0.13049841],"study_design_scores_gemma":[0.0002236446,0.0000040929135,0.029302219,0.00032945254,0.00003707317,0.0000069401367,0.000019419113,0.95558417,0.011102213,0.0025026842,0.0007405182,0.00014757852],"about_ca_topic_score_codex":0.00014634502,"about_ca_topic_score_gemma":0.000017236494,"teacher_disagreement_score":0.25396693,"about_ca_system_score_codex":0.00002478755,"about_ca_system_score_gemma":0.000016095879,"threshold_uncertainty_score":0.75978506},"labels":[],"label_agreement":null},{"id":"W4320081667","doi":"10.1061/jcemd4.coeng-13385","title":"Modular Construction/Off-Site Construction","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Modular design; Modular construction; Computer science; Construction engineering; Engineering; Programming language","score_opus":0.004072894585175111,"score_gpt":0.1744510038814622,"score_spread":0.17037810929628708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320081667","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81766045,0.0012180295,0.16504225,0.00028098808,0.010927009,0.0002825565,0.00001541847,0.0010217761,0.0035515502],"genre_scores_gemma":[0.9131654,0.011719138,0.07392988,0.00003250709,0.00081450836,0.000026970009,0.000016028654,0.00007831909,0.00021726366],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99876946,0.000016889922,0.0005579227,0.00014923475,0.0002747825,0.0002317305],"domain_scores_gemma":[0.9994365,0.000025015952,0.00014027822,0.00014355003,0.00013012973,0.000124557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022686219,0.00021066185,0.00026118505,0.0008262096,0.0000941712,0.00008812464,0.00008286974,0.0001041085,0.00004198482],"category_scores_gemma":[0.000014332534,0.00021534003,0.00010730113,0.00059145,0.000113858696,0.00039372052,0.00002559456,0.0002585808,0.000024284524],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031724438,0.000011633687,0.0014099536,0.00042995837,0.0005972421,0.00007264756,0.00018737836,0.2523258,0.0061469437,0.097899504,0.002068025,0.63881916],"study_design_scores_gemma":[0.004662575,0.00026571553,0.024418049,0.0008753632,0.0006919644,0.01645614,0.0050466093,0.4478924,0.0055869664,0.006911819,0.4855419,0.0016505058],"about_ca_topic_score_codex":0.0000011726922,"about_ca_topic_score_gemma":6.5047226e-7,"teacher_disagreement_score":0.6371687,"about_ca_system_score_codex":0.000080630074,"about_ca_system_score_gemma":0.000013352598,"threshold_uncertainty_score":0.87813115},"labels":[],"label_agreement":null},{"id":"W4320802102","doi":"10.1109/icdabi56818.2022.10041472","title":"Innovation in Construction: A new norm against Traditional Construction","year":2022,"lang":"en","type":"article","venue":"2022 International Conference on Data Analytics for Business and Industry (ICDABI)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Construction industry; Scopus; Norm (philosophy); Knowledge management; Computer science; Construction engineering; Engineering management; Engineering; Business; Political science","score_opus":0.1146396685007976,"score_gpt":0.2768311811639607,"score_spread":0.16219151266316312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320802102","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8009907,0.00022012877,0.089364186,0.017152106,0.01800375,0.0016157957,0.015150435,0.00056168606,0.056941178],"genre_scores_gemma":[0.9876137,0.00015458312,0.0022899082,0.00031186602,0.00062580244,0.00010735162,0.008335803,0.000029007237,0.0005320032],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850833,0.000020900603,0.00053326815,0.00037816525,0.00038444818,0.0001748674],"domain_scores_gemma":[0.9991681,0.00003911961,0.00014639428,0.0002806507,0.0003085526,0.000057169953],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00022317498,0.00019522497,0.00019043572,0.00059156265,0.00019704293,0.00015375027,0.00039110743,0.00016481696,0.0015584375],"category_scores_gemma":[0.0000851311,0.00022304081,0.00002769767,0.0009232405,0.00011136459,0.0005936883,0.00011676534,0.00067513506,0.000003471065],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012323982,0.00008072667,0.005166435,0.000035636072,0.0001311008,0.000005610461,0.00006749066,0.014654936,0.00092155114,0.8392892,0.016159493,0.123364575],"study_design_scores_gemma":[0.0030437545,0.00013867447,0.01207286,0.0001375122,0.00007027293,0.00032815713,0.0036955448,0.82359916,0.000317858,0.045419306,0.11028589,0.0008910148],"about_ca_topic_score_codex":0.000049157148,"about_ca_topic_score_gemma":0.000058391495,"teacher_disagreement_score":0.8089442,"about_ca_system_score_codex":0.00022289454,"about_ca_system_score_gemma":0.00027838183,"threshold_uncertainty_score":0.9993543},"labels":[],"label_agreement":null},{"id":"W4321100518","doi":"10.1108/jedt-02-2022-0096","title":"Using the TOE theoretical framework to study the adoption of BIM-AR in a developing country: the case of Ghana","year":2023,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College","funders":"","keywords":"Building information modeling; Context (archaeology); Business; Pace; Snowball sampling; Nonprobability sampling; Originality; Value (mathematics); Marketing; Developing country; Process management; Knowledge management; Operations management; Computer science; Engineering; Economics; Qualitative research","score_opus":0.01848475664339835,"score_gpt":0.25397976207050654,"score_spread":0.2354950054271082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321100518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60453707,0.00019873388,0.39462373,0.00035864572,0.00013906854,0.00011594505,4.4394636e-7,0.00002414469,0.0000022221789],"genre_scores_gemma":[0.99057597,0.000059740567,0.009311937,0.000008539284,0.000028021657,0.000006301168,5.4038875e-8,0.00000919017,2.758384e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945545,0.000032489064,0.00029002794,0.000045764966,0.00007573321,0.00010054821],"domain_scores_gemma":[0.9995004,0.0002424586,0.00005956723,0.00011577408,0.000069446534,0.000012371143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000595172,0.00007309365,0.0001415258,0.0002922287,0.000040133167,0.000011029947,0.00013349015,0.00008748685,0.0000022580055],"category_scores_gemma":[0.00016970745,0.000038996706,0.000019553481,0.0010327669,0.0000782888,0.000032137985,0.000023925464,0.0003141939,2.406419e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003724147,0.000025506904,0.0007449929,0.00004808081,0.00021034174,0.000137459,0.0022216819,0.2968132,0.011985557,0.6680731,0.000035541085,0.019667298],"study_design_scores_gemma":[0.0008096793,0.00062576524,0.0029162343,0.00064332946,0.00020195999,0.004793588,0.025423966,0.907237,0.020128356,0.036570422,0.00031970828,0.00032999823],"about_ca_topic_score_codex":0.000004099389,"about_ca_topic_score_gemma":0.0000031980496,"teacher_disagreement_score":0.6315027,"about_ca_system_score_codex":0.000026076052,"about_ca_system_score_gemma":0.000019324008,"threshold_uncertainty_score":0.15902396},"labels":[],"label_agreement":null},{"id":"W4321275887","doi":"10.17148/ijarcce.2023.12205","title":"Role of Artificial Intelligence in the Construction Industry – A Systematic Review","year":2023,"lang":"en","type":"review","venue":"IJARCCE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Kalinga Institute of Industrial Technology","keywords":"Quality (philosophy); Reliability (semiconductor); Risk analysis (engineering); Applications of artificial intelligence; Engineering; Computer science; Systems engineering; Construction engineering; Engineering management; Artificial intelligence","score_opus":0.05259661013394831,"score_gpt":0.3098943277072032,"score_spread":0.2572977175732549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321275887","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000012692493,0.9975011,0.00025751672,0.000008436991,0.00029962987,0.001058959,0.00001725984,0.000081063146,0.0007748024],"genre_scores_gemma":[0.000031635787,0.99939406,0.000060744573,0.000009279203,0.00006828143,0.00038277367,0.000015550391,0.000023452987,0.0000141980445],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.99840313,0.00018015965,0.0009901961,0.00012814792,0.00018150704,0.00011687288],"domain_scores_gemma":[0.9992653,0.00016568333,0.00020556236,0.00031065394,0.000035224162,0.00001757586],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043217163,0.0001898041,0.001000289,0.00017311507,0.000019074289,0.000022365006,0.00027380636,0.0003152377,0.00003673815],"category_scores_gemma":[0.00012540244,0.00012603527,0.00018876049,0.00090759125,0.00005282156,0.000050222578,0.000013508326,0.0006758547,0.00012037522],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[1.0706123e-7,0.0000025931984,1.0077906e-7,0.56587917,0.00002805731,8.672057e-7,0.00003460903,0.000008493276,2.0699335e-7,0.0070637264,0.000034033084,0.42694804],"study_design_scores_gemma":[0.000007733627,0.000009010262,2.698165e-7,0.9670597,0.0007887857,0.00020099805,0.000708324,0.0005707452,0.000004963028,0.002158625,0.028265247,0.00022562357],"about_ca_topic_score_codex":0.000010176026,"about_ca_topic_score_gemma":0.000017743687,"teacher_disagreement_score":0.42672244,"about_ca_system_score_codex":0.000054373486,"about_ca_system_score_gemma":0.00005540576,"threshold_uncertainty_score":0.51395696},"labels":[],"label_agreement":null},{"id":"W4321768227","doi":"10.1016/j.autcon.2023.104808","title":"Optimized decision support for BIM maturity assessment","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Research Grants Council, University Grants Committee; National Social Science Fund of China; National Natural Science Foundation of China; City University of Hong Kong","keywords":"Maturity (psychological); Capability Maturity Model; Building information modeling; Process (computing); Function (biology); Engineering; Process management; Systems engineering; Risk analysis (engineering); Computer science; Operations management; Business; Software","score_opus":0.01209271287198242,"score_gpt":0.2770197122604636,"score_spread":0.2649269993884812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321768227","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28149435,0.000014365259,0.70699245,0.00016419399,0.0045487494,0.00062199717,0.000037054466,0.0020472442,0.0040795854],"genre_scores_gemma":[0.78680325,0.00008325064,0.21218735,0.000023625435,0.00013789971,0.00038982526,0.00026498953,0.000031742715,0.00007804984],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990606,0.000022747605,0.00039821374,0.00017152578,0.00016910434,0.00017785134],"domain_scores_gemma":[0.99956155,0.00011920452,0.000057273715,0.00014446364,0.00008115788,0.00003633207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029213977,0.00012023924,0.00014794602,0.00043216147,0.00008487094,0.00006306452,0.00006381575,0.00014002291,0.00018104687],"category_scores_gemma":[0.00003967718,0.00012941507,0.00006231379,0.00057817076,0.000036895333,0.00035761937,0.000009992572,0.000117401505,0.00007853813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004189756,0.000017498498,0.0027800766,0.00011248876,0.000034750956,0.0000018309621,0.00014618246,0.08575352,0.0023667137,0.07163573,0.006083649,0.83102566],"study_design_scores_gemma":[0.0012553928,0.000026665946,0.027098583,0.000043624877,0.000012289556,0.000038034737,0.00030116618,0.9436489,0.0017038513,0.021132572,0.004541962,0.00019697596],"about_ca_topic_score_codex":0.0000054269453,"about_ca_topic_score_gemma":0.000010113673,"teacher_disagreement_score":0.8578954,"about_ca_system_score_codex":0.00016109516,"about_ca_system_score_gemma":0.0000435656,"threshold_uncertainty_score":0.52773935},"labels":[],"label_agreement":null},{"id":"W4322490938","doi":"10.1016/j.autcon.2023.104803","title":"Computer vision-based process time data acquisition for offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Alberta Innovates","keywords":"Workstation; Data acquisition; Factory (object-oriented programming); Process (computing); Engineering; Framing (construction); Real-time computing; Computer science; Frame (networking); Set (abstract data type); Simulation; Engineering drawing; Operating system; Mechanical engineering; Civil engineering","score_opus":0.012130677545308508,"score_gpt":0.2606846631337291,"score_spread":0.24855398558842062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322490938","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4694246,0.00003380039,0.51961404,0.0005119897,0.004285753,0.0011358893,0.00030537113,0.0038185143,0.00087000115],"genre_scores_gemma":[0.94840795,0.000016708407,0.047006533,0.000071326605,0.0005071746,0.00023044393,0.0036689548,0.00005787574,0.000033031698],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855274,0.000048219343,0.0005265721,0.0003831511,0.0002400458,0.00024924497],"domain_scores_gemma":[0.9991287,0.00013039836,0.00012129545,0.00039201515,0.00017617834,0.000051419778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033074676,0.00019913455,0.00020644811,0.00062918314,0.00014992013,0.00011575804,0.00018558584,0.00020041881,0.00014783411],"category_scores_gemma":[0.000029710727,0.00022511299,0.000051464387,0.0009733119,0.000117490126,0.0009741994,0.000021617832,0.00013684403,0.00021917575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095163814,0.000037566424,0.0036010079,0.00045751067,0.00006405319,0.0000028763268,0.00019432922,0.1730171,0.005622478,0.006847786,0.011065916,0.79899424],"study_design_scores_gemma":[0.0008404413,0.000042767373,0.0052640294,0.000108046384,0.000019957144,0.000049572373,0.00013615952,0.98770505,0.0014961154,0.002536203,0.001561194,0.00024047734],"about_ca_topic_score_codex":0.0000060887915,"about_ca_topic_score_gemma":0.000010469576,"teacher_disagreement_score":0.81468797,"about_ca_system_score_codex":0.00015194244,"about_ca_system_score_gemma":0.00006822336,"threshold_uncertainty_score":0.9179841},"labels":[],"label_agreement":null},{"id":"W4322747791","doi":"10.1007/978-3-031-23876-5_12","title":"Locating a New Fulfillment Center with the Domain Criterion","year":2023,"lang":"en","type":"book-chapter","venue":"International series in management science/operations research/International series in operations research & management science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Diversification (marketing strategy); Phenomenon; History; Advertising; Geography; Genealogy; Business; Marketing","score_opus":0.04286646769351254,"score_gpt":0.3503195925764155,"score_spread":0.30745312488290294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322747791","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036481034,0.00011412312,0.0048468984,0.028207282,0.0042653163,0.0041181194,0.0001442586,0.00035938388,0.9542965],"genre_scores_gemma":[0.21342635,0.005771596,0.015374447,0.00025869632,0.00085041503,0.0026444297,0.00046293085,0.00020635656,0.76100475],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98661464,0.00018578375,0.0012471323,0.001804172,0.008559284,0.0015889802],"domain_scores_gemma":[0.9960588,0.00014122263,0.00006818699,0.0013556005,0.0020546478,0.00032151028],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","open_science","insufficient_payload"],"consensus_categories":["sts"],"category_scores_codex":[0.008882616,0.0006318833,0.00037599803,0.008432043,0.0028063052,0.004729834,0.005814673,0.00017650526,0.0014633463],"category_scores_gemma":[0.00025553745,0.00053360587,0.000111304435,0.0048875962,0.0064379736,0.0054256446,0.0026236302,0.0018406619,0.00061054394],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010875877,0.00008254792,0.0000911135,0.00006565194,0.00011946739,0.00013604277,0.0011832367,0.14492601,0.00038317862,0.84060353,0.00423338,0.008067062],"study_design_scores_gemma":[0.002910114,0.00048101693,0.0052185794,0.0026285825,0.000038719507,0.00018894096,0.025235258,0.15426555,0.0007193364,0.053375367,0.75268835,0.0022501987],"about_ca_topic_score_codex":0.0004840748,"about_ca_topic_score_gemma":0.013641899,"teacher_disagreement_score":0.78722817,"about_ca_system_score_codex":0.004517255,"about_ca_system_score_gemma":0.00063078426,"threshold_uncertainty_score":0.9997116},"labels":[],"label_agreement":null},{"id":"W4323566250","doi":"10.1201/9781003354222-41","title":"Predicting semantic building information (BIM) with Recurrent Neural Networks","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Computer science; Artificial neural network; Artificial intelligence; Engineering; Operations management","score_opus":0.009826756204418731,"score_gpt":0.18762392994834753,"score_spread":0.1777971737439288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323566250","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00096969405,0.00017092584,0.2405469,0.000054364657,0.004576128,0.00047183142,0.000020366666,0.003112585,0.7500772],"genre_scores_gemma":[0.8043278,0.0012606791,0.0038269355,0.00023574338,0.003531629,0.00016678039,0.0012029901,0.0005488074,0.18489866],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992281,0.0000028274508,0.00031531058,0.00010940795,0.00018201392,0.00016232424],"domain_scores_gemma":[0.99964035,0.00002529357,0.00008001782,0.00013776422,0.0000693233,0.000047283447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005412198,0.00023284566,0.0001689336,0.00017849742,0.00006546914,0.00009624435,0.000071552146,0.00021868732,0.00011711516],"category_scores_gemma":[0.000004104775,0.0001975408,0.0000567833,0.000053419946,0.0000220628,0.00035185047,0.000018284456,0.0004501177,0.0000620919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001623392,0.0000014315374,0.00023363296,0.0002715738,0.00020226467,0.0000049458436,0.00013292702,0.29814482,0.000004237236,0.3350393,0.0029209636,0.3630277],"study_design_scores_gemma":[0.00013066067,0.00003392387,0.00005882054,0.00034472183,0.0000531486,0.000036535843,0.000039485294,0.987223,0.000008835204,0.0008115382,0.010966713,0.00029258934],"about_ca_topic_score_codex":0.000008746831,"about_ca_topic_score_gemma":0.00005859914,"teacher_disagreement_score":0.8033581,"about_ca_system_score_codex":0.000063543754,"about_ca_system_score_gemma":0.000010596638,"threshold_uncertainty_score":0.805548},"labels":[],"label_agreement":null},{"id":"W4324265153","doi":"10.2139/ssrn.4384337","title":"How Binding are Binding Guidelines? An Analytical Framework","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Binding site; Chemistry; Biochemistry","score_opus":0.027390870290876865,"score_gpt":0.28220700910808794,"score_spread":0.25481613881721105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324265153","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87720674,0.0006260276,0.11727082,0.0021355078,0.0014801803,0.0000717531,0.0000059188105,0.0006797,0.00052336155],"genre_scores_gemma":[0.9953756,0.0015984126,0.00052174705,0.000027855349,0.0010597887,0.0000047944095,0.000011829927,0.000044302542,0.001355694],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99790585,0.00003054422,0.000258846,0.00015024285,0.00024921677,0.0014052793],"domain_scores_gemma":[0.99953926,0.000030777628,0.00006751975,0.00014396857,0.000105213556,0.000113245565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007230943,0.00015739193,0.00015905117,0.00035861623,0.0002164035,0.0002492197,0.00018297395,0.00015995311,0.00003496008],"category_scores_gemma":[0.00014567262,0.00014341985,0.0001010983,0.00071225944,0.00002394318,0.00039994894,0.000013096694,0.001821333,0.00011603087],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025594214,0.000023171071,0.010657808,0.000029190436,0.00049789756,0.00003458844,0.0002417926,0.007846869,0.0052960804,0.7077576,0.0041726436,0.26341674],"study_design_scores_gemma":[0.0013425916,0.0004492967,0.0027318313,0.00050650566,0.00024154928,0.003154457,0.04055447,0.3932188,0.0020158538,0.5251633,0.028888581,0.0017327558],"about_ca_topic_score_codex":0.0000025174115,"about_ca_topic_score_gemma":0.00007963036,"teacher_disagreement_score":0.38537192,"about_ca_system_score_codex":0.000548251,"about_ca_system_score_gemma":0.00021957587,"threshold_uncertainty_score":0.7912887},"labels":[],"label_agreement":null},{"id":"W4327963475","doi":"10.1016/j.autcon.2023.104782","title":"BIM-driven computational design for robotic manufacturing in off-site construction: an integrated Design-to-Manufacturing (DtM) approach","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Interoperability; Robotics; Systems engineering; Context (archaeology); Operationalization; Information exchange; Engineering; Robot; Artificial intelligence; Manufacturing engineering; Data exchange; Software engineering; Computer science; Database; World Wide Web","score_opus":0.02880983547325586,"score_gpt":0.24227575331367424,"score_spread":0.21346591784041838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4327963475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27129337,0.000013473544,0.7253755,0.00006501945,0.0010959982,0.0010284445,0.000015972224,0.0010073833,0.00010486805],"genre_scores_gemma":[0.6890343,0.000015811407,0.31002662,0.000022044744,0.000106265994,0.00041283178,0.00031727483,0.000048619393,0.000016264457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99775344,0.00019607347,0.0008176532,0.0005062944,0.0002937028,0.00043284637],"domain_scores_gemma":[0.99915886,0.00024020227,0.000135406,0.00023091512,0.00011500906,0.000119617966],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004987002,0.00034316332,0.00035834705,0.0016061071,0.00018188047,0.00016996154,0.0001602733,0.00026845958,0.00005241975],"category_scores_gemma":[0.000050428393,0.00039165086,0.000074854805,0.0009744535,0.00010430403,0.0009156656,0.000021606991,0.00031821567,0.0000723682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043340413,0.000016597518,0.0006521926,0.000056039247,0.000023026401,0.0000020272407,0.00042615933,0.8757476,0.0005399939,0.002088622,0.00011555804,0.120288804],"study_design_scores_gemma":[0.0010194601,0.00006191667,0.011874333,0.000108849905,0.000017922488,0.00013436106,0.0010912694,0.968306,0.011854192,0.004936474,0.00018970552,0.00040549043],"about_ca_topic_score_codex":0.00003960969,"about_ca_topic_score_gemma":0.00005115453,"teacher_disagreement_score":0.41774088,"about_ca_system_score_codex":0.00048119863,"about_ca_system_score_gemma":0.00009789812,"threshold_uncertainty_score":0.99985355},"labels":[],"label_agreement":null},{"id":"W4362561456","doi":"10.1007/s10098-023-02495-2","title":"Environmental sustainability assessment of single-family modular homes using performance benchmarks of conventional homes: case studies in British Columbia, Canada","year":2023,"lang":"en","type":"article","venue":"Clean Technologies and Environmental Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Benchmarking; Benchmark (surveying); Sustainability; Modular design; Environmental economics; Renewable energy; Performance indicator; Engineering; Environmental resource management; Computer science; Business; Environmental science; Economics","score_opus":0.01089352082885561,"score_gpt":0.22635192054585138,"score_spread":0.21545839971699576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362561456","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9987775,0.00071512174,0.000017278493,0.000014835864,0.00007089802,0.00015198303,0.000167866,0.00006306257,0.00002145193],"genre_scores_gemma":[0.99775606,0.0020176761,0.00013473775,0.0000036372014,0.000009115003,0.0000151617305,0.000034620945,0.000011088802,0.000017870661],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991936,0.000012297449,0.00030035395,0.00016168563,0.00013674854,0.00019531102],"domain_scores_gemma":[0.9997504,0.000022039681,0.000063606014,0.0001387623,0.000004461455,0.00002076111],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007113649,0.00010046369,0.00021668739,0.000108382745,0.00007693641,0.000013708811,0.00007248011,0.00008611214,0.000015443273],"category_scores_gemma":[0.000014479376,0.00014500025,0.000033776407,0.0001731826,0.0006155834,0.00011071791,0.00011985793,0.00011551062,8.0523314e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036087008,0.00008988884,0.38697067,0.0005611445,0.000100470985,0.0001518455,0.00012873304,0.0094720265,0.013530559,0.000065933855,0.00020143185,0.58872366],"study_design_scores_gemma":[0.00047884404,0.00012128187,0.65116847,0.00009362882,0.000019019195,0.00035788995,0.32031858,0.024280831,0.0021999886,0.0006528303,0.000058163805,0.0002504952],"about_ca_topic_score_codex":0.11347177,"about_ca_topic_score_gemma":0.20972781,"teacher_disagreement_score":0.5884732,"about_ca_system_score_codex":0.00083242095,"about_ca_system_score_gemma":0.00004370877,"threshold_uncertainty_score":0.8924317},"labels":[],"label_agreement":null},{"id":"W4362664836","doi":"10.3390/buildings13040974","title":"Simulation-Assisted Project Data Integration for Development and Analysis of As-Built Schedules","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Computer science; Process (computing); Duration (music); Systems engineering; Software engineering; Operations research; Engineering; Programming language","score_opus":0.06949791614775487,"score_gpt":0.32833481933901054,"score_spread":0.2588369031912557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362664836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80607253,0.000052347623,0.19325557,0.000024566165,0.00008981356,0.00016022932,0.000046345227,0.00017828372,0.00012028564],"genre_scores_gemma":[0.97192365,0.000013106823,0.027364194,0.0000063746797,0.000017294438,0.000031583517,0.0005821108,0.000009565261,0.000052123673],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948514,0.0000053403705,0.00020420512,0.00014142571,0.00008601941,0.00007789956],"domain_scores_gemma":[0.99961674,0.00009577951,0.0000400852,0.00015471279,0.000076420365,0.000016248792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014409215,0.00007194338,0.00012455732,0.0003956586,0.00004882811,0.00002999929,0.00008516145,0.000049846967,0.000008769398],"category_scores_gemma":[0.000116374096,0.000067189416,0.000027071515,0.0008238711,0.00001680505,0.0001601337,0.000025575437,0.000033706903,0.0000023548066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003751753,0.000020616908,0.0062239277,0.00018434074,0.0013013976,4.4554108e-7,0.001508786,0.10344155,0.017690735,0.025810735,0.00092059316,0.8428593],"study_design_scores_gemma":[0.00013226745,0.000009002315,0.01145072,0.000023136769,0.00016782737,3.603587e-7,0.0002760012,0.971147,0.006988191,0.00018879278,0.009524932,0.00009177001],"about_ca_topic_score_codex":0.00002424681,"about_ca_topic_score_gemma":0.00007121631,"teacher_disagreement_score":0.86770546,"about_ca_system_score_codex":0.00002281656,"about_ca_system_score_gemma":0.000028419297,"threshold_uncertainty_score":0.27399048},"labels":[],"label_agreement":null},{"id":"W4362703390","doi":"10.1016/j.autcon.2023.104859","title":"Dynamic integration of unstructured data with BIM using a no-model approach based on machine learning and concept networks","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Unstructured data; Generalizability theory; Classifier (UML); Artificial intelligence; Parametric statistics; Machine learning; Data mining; Data science; Natural language processing; Big data","score_opus":0.014153410771090382,"score_gpt":0.2392545917782159,"score_spread":0.2251011810071255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362703390","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24493177,0.000041705574,0.7535184,0.00001930208,0.00031856817,0.00023944967,0.000034794688,0.00045156447,0.00044444037],"genre_scores_gemma":[0.9330511,0.000030482825,0.066117674,0.00000872625,0.00002202417,0.000014235264,0.00072327344,0.000024695657,0.000007786735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898815,0.000058229703,0.00035746288,0.00026352215,0.00018746546,0.00014517049],"domain_scores_gemma":[0.9994546,0.000051512798,0.00013119982,0.00022420191,0.000107145395,0.000031333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001871301,0.0001705603,0.00019040838,0.00043014804,0.00008283639,0.000042361462,0.00008545613,0.00014139325,0.000013746923],"category_scores_gemma":[0.000048981154,0.0001581643,0.00001864969,0.0007201539,0.0001292965,0.00037056522,0.000018590723,0.00027035395,0.0000015331074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027316377,0.000005209492,0.0014385135,0.000040268635,0.000012519528,3.2703304e-7,0.00008693666,0.9496911,0.0016610953,0.001399084,0.000010216527,0.045627374],"study_design_scores_gemma":[0.0006155492,0.00003528491,0.0015825944,0.00011277703,0.000020050957,0.000028652054,0.0002983278,0.9966881,0.00023999433,0.00020979854,0.000015782829,0.0001530602],"about_ca_topic_score_codex":0.00003141587,"about_ca_topic_score_gemma":0.00003834201,"teacher_disagreement_score":0.68811935,"about_ca_system_score_codex":0.00008554688,"about_ca_system_score_gemma":0.0000416818,"threshold_uncertainty_score":0.6449753},"labels":[],"label_agreement":null},{"id":"W4365814559","doi":"10.1108/ecam-07-2022-0674","title":"Formalizing the information requirements for decision-making of field managers during indoor construction activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Computer science; Decision support system; Field (mathematics); Quality (philosophy); Work (physics); Task (project management); Originality; Information system; Statement of work; Knowledge management; Information quality; Business decision mapping; Process management; Risk analysis (engineering); Management science; Systems engineering; Engineering; Business; Qualitative research","score_opus":0.005332218608330148,"score_gpt":0.21170978703372964,"score_spread":0.2063775684253995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365814559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62054604,0.000030893974,0.37425122,0.00010199535,0.002584434,0.00067735254,0.000018005989,0.00075061317,0.0010394598],"genre_scores_gemma":[0.9745979,0.000045493463,0.024991738,0.000019693149,0.00010260318,0.00018460026,0.000016433529,0.000023644436,0.000017896418],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987676,0.000011911872,0.0004962253,0.00014737282,0.0002671244,0.00030972483],"domain_scores_gemma":[0.99940306,0.00017668439,0.00011621971,0.00022760592,0.00004651078,0.000029918274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016929055,0.0002145932,0.00017780391,0.00064264797,0.00021984943,0.0000893415,0.00017295017,0.00006931457,0.00002507001],"category_scores_gemma":[0.000058596375,0.00019033685,0.00012653145,0.0005834428,0.00006516256,0.00061066693,0.00006521683,0.00017526475,0.000007954797],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007814638,0.0000023111065,0.00036062428,0.000659931,0.00021886869,0.0000011168615,0.0005541834,0.2705457,0.0012744995,0.01542166,0.00022690782,0.71065605],"study_design_scores_gemma":[0.0037888025,0.00026176928,0.039845496,0.002948948,0.00044541096,0.0006044062,0.01862119,0.854938,0.04291422,0.01094479,0.022550829,0.0021361967],"about_ca_topic_score_codex":0.0000031205532,"about_ca_topic_score_gemma":0.0000028991913,"teacher_disagreement_score":0.7085199,"about_ca_system_score_codex":0.000098826175,"about_ca_system_score_gemma":0.0000066236457,"threshold_uncertainty_score":0.77617115},"labels":[],"label_agreement":null},{"id":"W4366088320","doi":"10.3390/buildings13041050","title":"Developing a Construction-Oriented DfMA Deployment Framework","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal; Université du Québec à Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Context (archaeology); Construction industry; Engineering; Software deployment; Quality function deployment; Engineering management; Construction management; Systematic review; Process management; Computer science; Management science; Systems engineering; Construction engineering; Software engineering; Operations management; Civil engineering","score_opus":0.012566957154588061,"score_gpt":0.23626416641289644,"score_spread":0.22369720925830838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366088320","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62504005,0.00008496979,0.3676583,0.00040474502,0.0024458019,0.00011594692,0.0000045154184,0.0022866325,0.0019590773],"genre_scores_gemma":[0.9082839,0.00015292241,0.090824455,0.00014266133,0.0002739892,0.00007671725,0.000015250219,0.00004702769,0.00018310799],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936646,0.0000063925113,0.00017068967,0.00013418759,0.00012726421,0.00019500869],"domain_scores_gemma":[0.99974895,0.000033232158,0.00002059092,0.00010809646,0.000043815216,0.000045348144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000061213395,0.00010577587,0.00009121914,0.00014801741,0.00009451587,0.000037521397,0.0000654862,0.000092706374,0.000090924514],"category_scores_gemma":[0.00003509634,0.00011037013,0.000038618702,0.00062897225,0.000036198726,0.000103036225,0.000018109793,0.00013973372,0.00023332627],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005761414,0.0000035765809,0.005829787,0.000050159284,0.000066790155,0.000005901826,0.0004849398,0.0015593694,0.0040203393,0.85687894,0.0076746303,0.12341979],"study_design_scores_gemma":[0.0007947284,0.000044616685,0.01195312,0.0005589016,0.000051710154,0.0002135767,0.002679719,0.030006992,0.073817685,0.08691666,0.7917708,0.0011914785],"about_ca_topic_score_codex":0.0000076079623,"about_ca_topic_score_gemma":0.0000026455405,"teacher_disagreement_score":0.7840962,"about_ca_system_score_codex":0.00010075262,"about_ca_system_score_gemma":0.000022360373,"threshold_uncertainty_score":0.4500763},"labels":[],"label_agreement":null},{"id":"W4366492345","doi":"10.11159/icsect23.114","title":"Risk Analysis of Yard Stock Layout Management for InSitu Production of Steel-Connected Precast Concrete Members","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Education, India; National Research Foundation of Korea; National Research Foundation","keywords":"Precast concrete; Yard; Stock (firearms); Production (economics); Computer science; Engineering; Civil engineering; Mechanical engineering","score_opus":0.005878882801282305,"score_gpt":0.18721492650426313,"score_spread":0.18133604370298084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366492345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99832344,0.00007347396,0.000033212567,0.000017415003,0.0006759539,0.0004009933,0.000109572284,0.000086355474,0.00027958784],"genre_scores_gemma":[0.9990474,0.00013584935,0.000398609,0.00000208261,0.000025238165,0.000044535973,0.000020321231,0.000024889292,0.00030109353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907213,0.0000035742255,0.00034668177,0.00020896264,0.00020521009,0.00016345292],"domain_scores_gemma":[0.99960023,0.000036858382,0.00018508728,0.000116934614,0.000023752464,0.000037134527],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009850007,0.00019009974,0.00031415373,0.0004262259,0.00006073574,0.000014530744,0.000119906144,0.00004838089,0.000018068327],"category_scores_gemma":[0.000017906441,0.00016001644,0.00013951896,0.0006326345,0.00009283184,0.00014387761,0.000052303887,0.00011304555,2.2815786e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018481712,0.000010116244,0.022551527,0.0016231159,0.0037721638,3.428849e-7,0.00089932804,0.7225503,0.23308712,0.0057732044,0.0006222045,0.008925803],"study_design_scores_gemma":[0.00083761493,0.00009545294,0.14414312,0.00032464837,0.0015049309,0.000005034532,0.001200298,0.6316759,0.21901597,0.00014596734,0.0006235967,0.00042746364],"about_ca_topic_score_codex":0.0000073086903,"about_ca_topic_score_gemma":0.00001742702,"teacher_disagreement_score":0.1215916,"about_ca_system_score_codex":0.000049324022,"about_ca_system_score_gemma":0.0000014782429,"threshold_uncertainty_score":0.6525281},"labels":[],"label_agreement":null},{"id":"W4366502783","doi":"10.11159/icsect23.109","title":"A Systematic Methodology for Prioritizing Seismic Retrofit Alternatives","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"United Arab Emirates University","keywords":"Computer science; Construction engineering; Engineering","score_opus":0.014047860051701543,"score_gpt":0.22373944811160967,"score_spread":0.20969158805990812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366502783","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9965753,0.0003288407,0.00040684125,0.0000786302,0.0015165181,0.0005325095,0.000037081518,0.00024415,0.00028014145],"genre_scores_gemma":[0.9981378,0.000094435105,0.0011181805,0.000015151464,0.000064144915,0.00009169276,0.000003945772,0.00003600233,0.00043865223],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916387,0.0000054313555,0.00028613882,0.00018116702,0.00014571102,0.00021770205],"domain_scores_gemma":[0.999632,0.0001464575,0.000087215696,0.00007982799,0.000010487777,0.00004402529],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014679716,0.00019924494,0.0002856711,0.0001859383,0.00009293294,0.000039373535,0.00016965206,0.00005264535,0.0000064232454],"category_scores_gemma":[0.000047273174,0.00015514194,0.00008913281,0.0001788762,0.00006918273,0.00015309855,0.00005148767,0.00015181092,0.0000015702475],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000928445,0.000012823278,0.00448259,0.028719924,0.0009037788,0.0000021931326,0.0015890122,0.07812475,0.8072415,0.07194698,0.0012919172,0.0055916887],"study_design_scores_gemma":[0.0008943197,0.000087838656,0.01101964,0.0034441287,0.0001628406,0.00007729006,0.0015265952,0.8209863,0.15705916,0.0035805781,0.0005261483,0.00063520944],"about_ca_topic_score_codex":0.0000017457304,"about_ca_topic_score_gemma":0.0000025886552,"teacher_disagreement_score":0.7428615,"about_ca_system_score_codex":0.00006519252,"about_ca_system_score_gemma":0.000001713723,"threshold_uncertainty_score":0.63265043},"labels":[],"label_agreement":null},{"id":"W4366506687","doi":"10.11159/icsect23.125","title":"Optimization of a Waffle Slab for a Reinforced Concrete Structure. Economic and Environmental Comparison","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Slab; Reinforced concrete; Computer science; Structural engineering; Engineering","score_opus":0.004992269206092888,"score_gpt":0.18296680311527558,"score_spread":0.1779745339091827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366506687","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984738,0.00013860644,0.0001373691,0.00002406146,0.0005106315,0.00032034272,0.0002122711,0.00007876943,0.00010411176],"genre_scores_gemma":[0.9988829,0.00013232083,0.00069895014,0.0000061263017,0.000037554542,0.000022011714,0.000041326115,0.000032753367,0.00014604202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992137,0.0000018782906,0.00030989238,0.00018215529,0.00011489575,0.00017751151],"domain_scores_gemma":[0.9997106,0.000039934912,0.000116733856,0.00007693045,0.000003879579,0.000051890227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000043381217,0.00020815789,0.0002503375,0.00013975843,0.000079586,0.00003096472,0.000115047136,0.00006588328,0.00003533604],"category_scores_gemma":[0.0000061168175,0.00018089698,0.000057893423,0.00007556372,0.0001265256,0.00019028444,0.0000577108,0.0001170001,4.3462947e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053132757,9.0347686e-7,0.0027054043,0.0002920452,0.00010385819,9.721145e-8,0.00024464485,0.7719798,0.21898334,0.0038611381,0.00028625803,0.0014893762],"study_design_scores_gemma":[0.0005201065,0.00004562974,0.002053406,0.00007641199,0.0000356884,0.000009451002,0.0003423671,0.88088,0.11548642,0.00007480027,0.00028401334,0.00019173035],"about_ca_topic_score_codex":0.000003105047,"about_ca_topic_score_gemma":0.000003437433,"teacher_disagreement_score":0.10890017,"about_ca_system_score_codex":0.000068627225,"about_ca_system_score_gemma":0.0000023536425,"threshold_uncertainty_score":0.73767644},"labels":[],"label_agreement":null},{"id":"W4366506758","doi":"10.11159/icgre23.123","title":"BIM and Tunnelling – a Norwegian application: the Sotra Link Project","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Norwegian; Link (geometry); Quantum tunnelling; Computer science; Systems engineering; Engineering; Physics; Computer network; Optoelectronics","score_opus":0.005940201048052681,"score_gpt":0.18601696462170314,"score_spread":0.18007676357365046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366506758","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9973164,0.000281271,0.00008465188,0.00039091337,0.00060100044,0.0003838704,0.000020822712,0.00023136503,0.0006896789],"genre_scores_gemma":[0.9991323,0.0002959406,0.00014312663,0.000021055155,0.000109008346,0.00005592772,0.0000043414584,0.000028916847,0.0002094265],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992754,0.0000021177088,0.00018901014,0.00018638004,0.00015868538,0.0001884136],"domain_scores_gemma":[0.99976414,0.000037618705,0.00005244957,0.00009859117,0.000007148319,0.00004005806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007006553,0.00019064154,0.00013784834,0.00011849674,0.0001617197,0.00006784299,0.00016755446,0.00004970767,0.000008407266],"category_scores_gemma":[0.0000064680935,0.00012765858,0.000045597808,0.00027533114,0.00012404213,0.00014545987,0.00006557224,0.00022688885,0.0000023535517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011515232,0.000027308637,0.02826954,0.0022227617,0.0006848519,0.0000030903473,0.0039321524,0.13574132,0.49277785,0.12044847,0.0038182382,0.21195924],"study_design_scores_gemma":[0.0008435691,0.00006956804,0.0732034,0.0004415267,0.00011844161,0.00011090095,0.0019601113,0.84226155,0.060970053,0.0025929892,0.016550051,0.0008778393],"about_ca_topic_score_codex":0.0000048908623,"about_ca_topic_score_gemma":0.0000063389934,"teacher_disagreement_score":0.70652026,"about_ca_system_score_codex":0.000031963056,"about_ca_system_score_gemma":0.0000023138987,"threshold_uncertainty_score":0.5205766},"labels":[],"label_agreement":null},{"id":"W4366595889","doi":"10.11159/csee23","title":"Proceedings of the 8th World Congress on Civil, Structural, and Environmental Engineering","year":2023,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Water Research Institute","keywords":"Engineering; Computer science; Political science; Engineering ethics; Environmental ethics; Civil engineering; Philosophy","score_opus":0.005610067189781912,"score_gpt":0.18390953468720064,"score_spread":0.17829946749741873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366595889","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9815979,0.0014131728,0.0000027863593,0.0001283135,0.00968634,0.0012116177,0.000880032,0.00025156053,0.004828302],"genre_scores_gemma":[0.9833953,0.0010058857,0.0001110244,0.00003728962,0.00035677894,0.00010279556,0.000055348944,0.00025989208,0.014675686],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99667823,0.000007213881,0.00093182904,0.0008202971,0.0008413669,0.00072103675],"domain_scores_gemma":[0.99880904,0.00012372776,0.00051928393,0.00030605198,0.000027365733,0.00021455316],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013783062,0.0011828247,0.000981728,0.0006203118,0.00030189662,0.0002157306,0.00082389364,0.00035727234,0.0002969252],"category_scores_gemma":[0.000029853896,0.0008926173,0.00031903066,0.000541684,0.00050736516,0.00044635037,0.00046121652,0.0013970032,0.000019125791],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00057036936,0.00013850194,0.015247456,0.013251994,0.003652598,0.0000090545345,0.00174886,0.18318939,0.60530746,0.019289616,0.14726177,0.010332911],"study_design_scores_gemma":[0.005913548,0.0006934906,0.080438994,0.015867049,0.0015026026,0.00047627755,0.0028087602,0.23796281,0.5413383,0.00078818126,0.10422593,0.007984029],"about_ca_topic_score_codex":0.000015849968,"about_ca_topic_score_gemma":0.000033811844,"teacher_disagreement_score":0.065191545,"about_ca_system_score_codex":0.00034646175,"about_ca_system_score_gemma":0.0000122158435,"threshold_uncertainty_score":0.99935246},"labels":[],"label_agreement":null},{"id":"W4366808596","doi":"10.5267/j.jpm.2023.4.001","title":"The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Heuristics; Computer science; Probabilistic logic; Operations research; Variety (cybernetics); Range (aeronautics); Scheduling (production processes); Table (database); Mathematical optimization; Total cost; Industrial engineering; Management science; Data mining; Mathematics; Artificial intelligence; Engineering","score_opus":0.016106731645807417,"score_gpt":0.23659227085878468,"score_spread":0.22048553921297726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808596","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9622899,0.009748485,0.0024493036,0.004307978,0.0029367642,0.0040271794,0.00006055488,0.0002514001,0.013928392],"genre_scores_gemma":[0.9779264,0.01171215,0.00078560365,0.00008062689,0.000090380774,0.000054147946,0.0000041775074,0.00004299837,0.009303512],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993464,0.000059521215,0.00026963695,0.000057027377,0.00016644769,0.00010098441],"domain_scores_gemma":[0.9996978,0.000059907314,0.0000955537,0.00007619973,0.000048497255,0.00002202203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063858775,0.00007166064,0.000099999226,0.00010839361,0.00008306457,0.0000478141,0.000082725455,0.000017799633,0.0000036081865],"category_scores_gemma":[0.000021078904,0.000040990526,0.000033725868,0.0002420435,0.000026681702,0.00009592901,0.00003797204,0.00011472983,0.000005956626],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012534687,0.000043261338,0.0031886676,0.00043410808,0.0006903164,0.000025790656,0.0014602253,0.0026853606,0.0016064671,0.0024531719,0.18034448,0.8069428],"study_design_scores_gemma":[0.0030273623,0.00045749976,0.4096116,0.00096368033,0.0003233727,0.00038826457,0.0020865372,0.10441544,0.0021974174,0.005686934,0.47019708,0.0006448002],"about_ca_topic_score_codex":0.0000024940434,"about_ca_topic_score_gemma":0.000027390797,"teacher_disagreement_score":0.806298,"about_ca_system_score_codex":0.000019475014,"about_ca_system_score_gemma":0.000013373343,"threshold_uncertainty_score":0.1671545},"labels":[],"label_agreement":null},{"id":"W4367317952","doi":"10.18280/mmep.100212","title":"Evaluation of Construction Project’s Cost Using BIM Technology","year":2023,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction engineering; Engineering; Building information modeling; Architectural engineering; Systems engineering; Computer science; Operations management","score_opus":0.0677439223874451,"score_gpt":0.2610895634976526,"score_spread":0.19334564111020752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367317952","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31597453,0.00016487479,0.6826553,0.000012307854,0.00014988797,0.00024677505,0.0000026898042,0.00050746347,0.00028616705],"genre_scores_gemma":[0.96652895,0.00006949576,0.033266395,5.044422e-7,0.000025178819,0.000074887,0.0000039287515,0.000025242007,0.0000054391617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922657,0.000009482485,0.0002627011,0.00011409883,0.00022966259,0.00015748563],"domain_scores_gemma":[0.99969244,0.00002645756,0.000027220463,0.00010476209,0.00012290971,0.000026191537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046202363,0.000111502835,0.00015664725,0.00035811172,0.000033900364,0.000018670513,0.000040461797,0.00011769921,0.000008190365],"category_scores_gemma":[0.000033431512,0.000108136264,0.000025055246,0.000514654,0.000043897868,0.0000781385,0.000011801666,0.000118883996,0.0000062527442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[4.920622e-7,0.0000040135856,0.00001072678,0.00026463866,0.000024076468,1.1648345e-7,0.00012277345,0.9605784,0.0031380283,0.024963038,0.000003970453,0.010889744],"study_design_scores_gemma":[0.00014501429,0.000008908822,0.0000023046498,0.000182781,0.000055510336,0.00002998005,0.000108862274,0.96301675,0.0018766436,0.034405682,0.00006401622,0.00010357423],"about_ca_topic_score_codex":0.0000031351253,"about_ca_topic_score_gemma":2.845654e-7,"teacher_disagreement_score":0.6505544,"about_ca_system_score_codex":0.000042277392,"about_ca_system_score_gemma":0.000018941013,"threshold_uncertainty_score":0.4409669},"labels":[],"label_agreement":null},{"id":"W4367553863","doi":"10.1061/9780784484777.032","title":"Using Dimensional Control to Mitigate Risk for Pre-Assembled Units/Piperacks Installation","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dow Chemical (Canada); Intertek (Canada)","funders":"","keywords":"Rework; Schedule; Computer science; Control (management); Systems engineering; Interface (matter); Reliability engineering; Risk analysis (engineering); Construction engineering; Engineering; Embedded system","score_opus":0.021469314530175764,"score_gpt":0.2603658607842072,"score_spread":0.23889654625403145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367553863","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7363252,0.000008619024,0.26144424,0.000056606656,0.0004584613,0.0002965746,0.000035971778,0.00041866928,0.00095564243],"genre_scores_gemma":[0.9966344,0.0000027759388,0.0027931072,0.000057789257,0.000087482,0.000048377176,0.000032774533,0.000018882298,0.00032436504],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995016,0.000013020054,0.00015612536,0.00010335916,0.00008666949,0.00013926119],"domain_scores_gemma":[0.9996598,0.000065903456,0.00001774818,0.00007743381,0.00012439741,0.000054731394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009154378,0.00008449753,0.00008623095,0.00012013233,0.000094280265,0.000031750442,0.0000317774,0.000059299557,0.00006026642],"category_scores_gemma":[0.00003851761,0.00007948077,0.000031301024,0.00033960553,0.0000050982203,0.00015113309,0.0000059964145,0.000057362682,0.000057322108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036197802,0.0000033245317,0.0011219827,0.000016677312,0.00004979346,3.652745e-7,0.00014360092,0.8622115,0.113626525,0.0046141837,0.0019843276,0.016191471],"study_design_scores_gemma":[0.0005282294,0.000020179095,0.0030302054,0.00001476253,0.000020160553,0.0000025733082,0.000070172886,0.9863809,0.0053065056,0.0007760194,0.003730965,0.000119372955],"about_ca_topic_score_codex":0.000041037812,"about_ca_topic_score_gemma":0.000070904534,"teacher_disagreement_score":0.26030922,"about_ca_system_score_codex":0.000040859177,"about_ca_system_score_gemma":0.000021192507,"threshold_uncertainty_score":0.3241132},"labels":[],"label_agreement":null},{"id":"W4372311861","doi":"10.1016/j.jobe.2023.106780","title":"BIM and LCA integration methodologies: A critical analysis and proposed guidelines","year":2023,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Fundação de Amparo à Pesquisa e Inovação do Espírito Santo","keywords":"Building information modeling; Standardization; Context (archaeology); Best practice; Life-cycle assessment; Process (computing); Systematic review; Construction industry; Environmental impact assessment; Process management; Computer science; Engineering; Risk analysis (engineering); Management science; Construction engineering; Production (economics); Business; Operations management; MEDLINE","score_opus":0.051160412977094755,"score_gpt":0.33472480993366527,"score_spread":0.28356439695657054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4372311861","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31966174,0.0005351046,0.67901844,0.00024054284,0.00036831942,0.000023268098,0.0000013259163,0.00013871084,0.000012523059],"genre_scores_gemma":[0.8232424,0.00036783927,0.1762204,0.000007907765,0.00014153136,0.0000010870716,7.09463e-7,0.000012288322,0.0000057977095],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993356,0.000015600364,0.00034643777,0.000072917464,0.00011655439,0.00011288569],"domain_scores_gemma":[0.9994751,0.00022668763,0.000039947343,0.000054793334,0.00014527209,0.00005815618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049558404,0.00009696977,0.00021309646,0.0006820569,0.000030480365,0.00006665297,0.00004703772,0.00006412998,0.000004727667],"category_scores_gemma":[0.00092259416,0.00008055683,0.000063539104,0.0005176431,0.000020914695,0.00021746896,0.000014065436,0.00017311372,3.779124e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021124133,0.000005953908,0.0018320886,0.00026401656,0.00086329685,0.000036499863,0.0005977576,0.33646187,0.47217712,0.013865289,0.00078954914,0.17308544],"study_design_scores_gemma":[0.00017519724,0.00004757466,0.005937378,0.00013905519,0.00027762665,0.00016143764,0.00031748938,0.96565586,0.02513375,0.0013830075,0.00060753175,0.00016411275],"about_ca_topic_score_codex":0.0000026092175,"about_ca_topic_score_gemma":0.0000017824672,"teacher_disagreement_score":0.62919396,"about_ca_system_score_codex":0.000026476695,"about_ca_system_score_gemma":0.000007830456,"threshold_uncertainty_score":0.3285012},"labels":[],"label_agreement":null},{"id":"W4372403996","doi":"10.1155/2023/1058063","title":"Application of System Dynamics in Construction Engineering and Management: Content Analysis and Systematic Literature Review","year":2023,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund","keywords":"Systematic review; Content analysis; Computer science; Dynamism; Abstraction; Management science; Data science; Domain (mathematical analysis); Engineering; MEDLINE; Sociology","score_opus":0.0035662357158555117,"score_gpt":0.1956973953945726,"score_spread":0.19213115967871708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4372403996","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053212624,0.36727542,0.57506216,0.00002838291,0.0007668689,0.0018754797,0.000039437935,0.00095200335,0.0007876193],"genre_scores_gemma":[0.909946,0.08828907,0.0015178218,0.0000017277036,0.000009242103,0.00019074709,0.000027076216,0.000014955392,0.0000033462102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992061,0.000009808114,0.00041548355,0.00015156002,0.00009273827,0.00012426493],"domain_scores_gemma":[0.999722,0.00004723926,0.00005068957,0.0001310886,0.000023455847,0.000025518762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018587094,0.00013227157,0.0003535769,0.00072741596,0.000009454999,0.000015543308,0.000048107733,0.000052862375,3.5098427e-7],"category_scores_gemma":[0.000015334595,0.00013693993,0.000032503798,0.0018628436,0.000012081678,0.00024239,0.000015760383,0.00010643952,5.08909e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000022873362,0.0000037550817,0.007543448,0.3947002,0.00015943657,0.000013019353,0.00011550425,0.5311189,0.00031613882,0.05638396,7.7703487e-7,0.00964251],"study_design_scores_gemma":[0.00012765895,0.0000034643367,0.002426577,0.0297501,0.00009783532,0.000028540113,0.00023149127,0.96713465,0.000037910406,0.000015358819,0.000027394266,0.000119042765],"about_ca_topic_score_codex":0.0000034468137,"about_ca_topic_score_gemma":0.00013717142,"teacher_disagreement_score":0.8567334,"about_ca_system_score_codex":0.00012339992,"about_ca_system_score_gemma":0.0000011428091,"threshold_uncertainty_score":0.55842483},"labels":[],"label_agreement":null},{"id":"W4375867750","doi":"10.1061/jcemd4.coeng-13427","title":"Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Computer science; Scheduling (production processes); Two-level scheduling; Automated planning and scheduling; Planner; Dynamic priority scheduling; Industrial engineering; Systems engineering; Schedule; Engineering; Operations management; Artificial intelligence","score_opus":0.01921588944281504,"score_gpt":0.28996288417762717,"score_spread":0.2707469947348121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4375867750","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08668875,0.0009723276,0.9096981,0.00008795533,0.0017609396,0.00019839124,0.0000046490586,0.00021688038,0.0003719932],"genre_scores_gemma":[0.46249625,0.0010307946,0.5356843,0.000042924847,0.00042204617,0.0000677181,0.000015412657,0.000047227175,0.00019333599],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993928,0.000015280466,0.00028979115,0.00009043723,0.00009380579,0.00011788138],"domain_scores_gemma":[0.9996881,0.00006297674,0.00006827927,0.000046943715,0.000085871194,0.00004781068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034670896,0.00011220134,0.00015881982,0.00036421104,0.000060338203,0.00005807971,0.000033478227,0.000052443935,0.000005248143],"category_scores_gemma":[0.00003951518,0.00010415683,0.00004655041,0.00024716716,0.00003334296,0.0001693154,0.000012373527,0.0001364199,5.289717e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008460181,0.000009029342,0.00036388895,0.00069171045,0.0007708348,0.000015392807,0.0007642636,0.38118377,0.0040380256,0.07479002,0.0017832348,0.53550524],"study_design_scores_gemma":[0.00214814,0.00021175343,0.0027722688,0.0005565012,0.0002644024,0.0013251186,0.0069022593,0.77514327,0.0027828405,0.0034546629,0.20396197,0.0004768192],"about_ca_topic_score_codex":0.0000016922613,"about_ca_topic_score_gemma":1.4466563e-7,"teacher_disagreement_score":0.5350284,"about_ca_system_score_codex":0.00003439739,"about_ca_system_score_gemma":0.000013267646,"threshold_uncertainty_score":0.42473924},"labels":[],"label_agreement":null},{"id":"W4376278966","doi":"10.3389/fbuil.2023.1117066","title":"BIM for FM: understanding information quality issues in terms of compliance with owner’s Building Information Modeling Requirements","year":2023,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Fraser Health Authority","keywords":"Building information modeling; Enabling; Facility management; Process management; Information model; Information quality; Knowledge management; Computer science; Process (computing); Information system; Engineering; Risk analysis (engineering); Operations management; Database; Business; Psychology","score_opus":0.06524627948883693,"score_gpt":0.27719875872802696,"score_spread":0.21195247923919003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376278966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10734211,0.0000274705,0.89152616,0.000081846185,0.0003170232,0.0003440895,0.000022042808,0.00006400242,0.00027524302],"genre_scores_gemma":[0.970963,0.00019097627,0.02863577,0.000014710209,0.000012821925,0.00007155193,0.00009318812,0.000008982932,0.000008979781],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990166,0.000014422273,0.0004995013,0.00008106885,0.0002060558,0.0001823692],"domain_scores_gemma":[0.99973243,0.000011111786,0.00009333584,0.0001330551,0.000007123634,0.000022938255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028148686,0.00011368838,0.00016798846,0.00034531901,0.000038481216,0.00002640191,0.00008501765,0.00006748454,0.000004825859],"category_scores_gemma":[0.000011808709,0.00009985894,0.000025318688,0.0002057268,0.000032723863,0.0011841214,0.000017306713,0.0000854075,0.000004256624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005444743,0.000008169267,0.02547534,0.0002647261,0.000020588706,1.3991067e-7,0.0010345919,0.9517832,0.00031236836,0.003230239,0.00026933264,0.017546905],"study_design_scores_gemma":[0.000815933,0.000030502613,0.0043949755,0.00019626068,0.000005883802,4.5912967e-7,0.0030214416,0.98156685,0.0009060443,0.0075275875,0.0013647251,0.00016932526],"about_ca_topic_score_codex":0.00004409859,"about_ca_topic_score_gemma":0.000014239312,"teacher_disagreement_score":0.86362094,"about_ca_system_score_codex":0.0005439642,"about_ca_system_score_gemma":0.0000051259985,"threshold_uncertainty_score":0.4072129},"labels":[],"label_agreement":null},{"id":"W4377826098","doi":"10.1007/s41062-023-01141-6","title":"Building information modeling (BIM)-based model checking to ensure occupant safety in institutional buildings","year":2023,"lang":"en","type":"article","venue":"Innovative Infrastructure Solutions","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Set (abstract data type); Engineering; Construction engineering; Architectural engineering; Building design; Building code; Information model; Built environment; Transport engineering; Computer science; Risk analysis (engineering); Civil engineering; Software engineering; Business; Operations management","score_opus":0.018319514384764143,"score_gpt":0.24843693068756456,"score_spread":0.23011741630280041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377826098","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2359892,0.00001158773,0.7604346,0.00026843886,0.00051710964,0.00025833573,0.00016142271,0.00056534377,0.0017939247],"genre_scores_gemma":[0.94230664,0.000004991211,0.05703163,0.0002550243,0.00008938648,0.00009095445,0.00019592786,0.000021627828,0.000003846094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982696,0.000020814352,0.0006834153,0.00022334061,0.0003224193,0.00048041326],"domain_scores_gemma":[0.9991375,0.000032903754,0.000069139576,0.00019421295,0.0004866957,0.000079514764],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032060727,0.00027041056,0.00022354795,0.0013617291,0.00036548747,0.00008985265,0.00018964727,0.00021485517,0.000027998167],"category_scores_gemma":[0.00018198101,0.00028761456,0.00005693701,0.0043841414,0.000070731105,0.0009766092,0.00006380873,0.00056070456,0.000038279824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015368543,0.0000030836602,0.00031944897,0.000022804654,0.000014922671,8.0543964e-7,0.00045327624,0.8069364,0.004490877,0.17637166,0.00044048656,0.010930852],"study_design_scores_gemma":[0.00039778408,0.000010075522,0.0037293348,0.00011420066,0.0000054796433,0.0000074240097,0.0002571396,0.979574,0.0007411245,0.011976897,0.0028867282,0.0002998057],"about_ca_topic_score_codex":0.000033639986,"about_ca_topic_score_gemma":0.000058752976,"teacher_disagreement_score":0.7063174,"about_ca_system_score_codex":0.00060473,"about_ca_system_score_gemma":0.0002741306,"threshold_uncertainty_score":0.9999576},"labels":[],"label_agreement":null},{"id":"W4377982347","doi":"10.54729/2789-8547.1227","title":"DEVELOPING A DESIGN FRAMEWORK FOR THE MASS CUSTOMISATION OF HOUSING IN SAUDI ARABIA - A CRITICAL REVIEW","year":2023,"lang":"en","type":"review","venue":"Architecture and Planning Journal (APJ)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ASTER","funders":"McGill University; Harvard Business School","keywords":"Workflow; Context (archaeology); Scopus; Engineering; Computer science; Chart; Engineering management; Systems engineering; Geography; Database; Political science; MEDLINE; Mathematics","score_opus":0.10596800390616039,"score_gpt":0.35072175881983814,"score_spread":0.24475375491367773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377982347","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000012096741,0.5338597,0.4654244,0.00011520774,0.00028941093,0.00027030264,0.00000541716,0.000023108327,0.000011218755],"genre_scores_gemma":[0.00003107652,0.95066994,0.04878173,0.00006634771,0.00033616152,0.000064239626,0.0000068101263,0.000040083192,0.0000036012036],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987461,0.00014797614,0.00062323903,0.00013398936,0.00013919806,0.00020948723],"domain_scores_gemma":[0.9970845,0.0025457582,0.00016861671,0.0001021052,0.000054687043,0.000044346896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077531446,0.00023229628,0.00070586166,0.00023149204,0.00014165812,0.00006718897,0.00013440214,0.00022131995,0.000005910464],"category_scores_gemma":[0.0007056392,0.00015136234,0.00017392192,0.0003384279,0.000044689627,0.000048134607,0.0000111988575,0.0010394511,0.0000014000223],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006498424,0.0000011892231,0.0000052511955,0.022630384,0.00009783,0.000008469505,0.00026370774,0.0021695176,6.797575e-7,0.001213181,0.0003221396,0.97328115],"study_design_scores_gemma":[0.00017263477,0.00005227534,0.000022170932,0.46090135,0.00091956474,0.0010023677,0.00014214478,0.0024516548,0.000004285426,0.04890715,0.4849095,0.0005148911],"about_ca_topic_score_codex":0.0000017678896,"about_ca_topic_score_gemma":0.000001879513,"teacher_disagreement_score":0.9727663,"about_ca_system_score_codex":0.00005958748,"about_ca_system_score_gemma":0.000121093035,"threshold_uncertainty_score":0.61723775},"labels":[],"label_agreement":null},{"id":"W4378836433","doi":"10.18280/ijsdp.180518","title":"Modelling Design Standards for Iraqi Schools Using Building Information Modeling","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Building information modeling; Computer science; Environmental planning; Civil engineering; Environmental science; Construction engineering; Engineering; Systems engineering; Operations management","score_opus":0.03403824909058557,"score_gpt":0.2725954859099814,"score_spread":0.23855723681939583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378836433","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35580546,0.00012979838,0.64348537,0.000021132693,0.00039816208,0.00006780346,0.000002659392,0.00003731396,0.000052275824],"genre_scores_gemma":[0.8888203,0.000051178286,0.1108874,0.000014838981,0.00017139038,0.0000069949997,0.000012497091,0.0000113659835,0.000024071072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989972,0.00000856899,0.00042982583,0.000051608728,0.00033362934,0.00017914492],"domain_scores_gemma":[0.998652,0.00004633881,0.00010644177,0.000023925579,0.0011241797,0.000047119873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077691954,0.00009572426,0.00011161858,0.00063454796,0.00013674446,0.00022414023,0.000102323145,0.00005417386,0.0000029921507],"category_scores_gemma":[0.000080759564,0.00009506772,0.000032087057,0.00015417913,0.0000060222806,0.0012502476,0.000019383875,0.00013581714,5.8142376e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006032005,0.0000012256035,0.00007037152,0.000042180563,0.00008054903,0.000022944761,0.001933106,0.98681724,0.00010979357,0.0017263594,0.00022988877,0.008906044],"study_design_scores_gemma":[0.00037196922,0.000010776808,0.000007807793,0.00017874746,0.000009383794,0.000047997513,0.0125618,0.9775644,0.0010016776,0.002459037,0.005677019,0.0001093682],"about_ca_topic_score_codex":0.0000035331814,"about_ca_topic_score_gemma":5.153932e-8,"teacher_disagreement_score":0.53301483,"about_ca_system_score_codex":0.0002993121,"about_ca_system_score_gemma":0.00024076481,"threshold_uncertainty_score":0.3876749},"labels":[],"label_agreement":null},{"id":"W4379419119","doi":"10.1061/jcemd4.coeng-12891","title":"Crane Mat Layout Optimization Based on Agent-Based Greedy and Reinforcement-Learning Approach","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Modular design; Plan (archaeology); Computer science; Industrial engineering; Engineering; Transport engineering; Artificial intelligence","score_opus":0.006032767202855141,"score_gpt":0.17752665299140344,"score_spread":0.1714938857885483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379419119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019075338,0.00007352772,0.9772006,0.00008320452,0.0007802741,0.0001313049,9.582799e-7,0.0002512192,0.0024035713],"genre_scores_gemma":[0.9733248,0.00034830917,0.026064832,0.000027018983,0.00008661531,0.000011498574,0.000012865163,0.000024309773,0.00009977403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992976,0.000012877043,0.0002785497,0.00009282399,0.00019126011,0.00012684554],"domain_scores_gemma":[0.9997218,0.000019468922,0.000078558216,0.00006745286,0.000045377303,0.00006733392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001831429,0.00013030559,0.00013882853,0.0005426804,0.00006506828,0.00006617391,0.00003976292,0.00005118562,0.000017812263],"category_scores_gemma":[0.000010235952,0.00012693711,0.00004108932,0.00025204092,0.000024666931,0.00013058595,0.000008907497,0.0001638696,0.0000018967266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015880387,0.000004081763,0.00011442272,0.00020456685,0.000048811813,0.0000056698195,0.000026265954,0.9853071,0.00007643527,0.0013368683,0.00013579657,0.012724095],"study_design_scores_gemma":[0.00072267617,0.00006181369,0.0003984024,0.00010867086,0.000045561257,0.000049392565,0.00019512558,0.99552065,0.000100785495,0.000009384275,0.002670354,0.0001171638],"about_ca_topic_score_codex":7.3832183e-7,"about_ca_topic_score_gemma":7.836177e-8,"teacher_disagreement_score":0.95424944,"about_ca_system_score_codex":0.000043789856,"about_ca_system_score_gemma":0.000006058069,"threshold_uncertainty_score":0.5176345},"labels":[],"label_agreement":null},{"id":"W4379624712","doi":"10.1016/j.autcon.2023.104952","title":"Operations planning and scheduling in off-site construction supply chain management: Scope definition and future directions","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Supply chain; Supply chain management; Procurement; Computer science; Scope (computer science); Process management; Integrated business planning; Operations research; Operations management; Systems engineering; Engineering; Business","score_opus":0.00918398281345273,"score_gpt":0.21978350245852346,"score_spread":0.21059951964507073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379624712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9897339,0.0010776364,0.0035849817,0.00033165724,0.0014574307,0.00038816736,0.000023130013,0.00080664444,0.0025964512],"genre_scores_gemma":[0.9733986,0.005700167,0.020243306,0.000022553459,0.00020311434,0.00019406228,0.00018975479,0.000029578618,0.000018842366],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988178,0.000066571614,0.00045714236,0.0002927347,0.00014588352,0.0002198778],"domain_scores_gemma":[0.9996876,0.00004227259,0.000050594892,0.00012021444,0.000047255788,0.00005206459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023548698,0.00018748229,0.00017584098,0.0011897964,0.00022546847,0.00014492354,0.000036718648,0.0001779998,0.000035545494],"category_scores_gemma":[0.00001619144,0.00022534937,0.0000241089,0.0012414993,0.00012039647,0.00081329973,0.000021722679,0.00025609077,0.000021572601],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020189163,0.000015210937,0.06931636,0.00021681278,0.00004287851,0.0000108684435,0.0019965416,0.044392057,0.0016399958,0.10388098,0.00006391656,0.7784042],"study_design_scores_gemma":[0.0015376615,0.0000271729,0.34913102,0.0004448421,0.00003620519,0.00041883998,0.008036919,0.63114554,0.0004619965,0.005494839,0.0027842836,0.00048067345],"about_ca_topic_score_codex":0.000043241176,"about_ca_topic_score_gemma":0.00023578861,"teacher_disagreement_score":0.7779235,"about_ca_system_score_codex":0.00012127773,"about_ca_system_score_gemma":0.000017378374,"threshold_uncertainty_score":0.91894805},"labels":[],"label_agreement":null},{"id":"W4379798983","doi":"10.3390/buildings13061474","title":"BIM-Based Checking Method for the Mass Timber Industry","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Building information modeling; Process (computing); Audit; Prefabrication; Interview; Engineering; Construction engineering; Factory (object-oriented programming); Computer science; Construction industry; Architectural engineering; Systems engineering; Software engineering; Risk analysis (engineering); Civil engineering; Operations management; Accounting; Business","score_opus":0.021011894904661797,"score_gpt":0.2755194760455381,"score_spread":0.2545075811408763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379798983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02589188,0.00006136729,0.9692357,0.0009967671,0.00085851573,0.00016595749,0.000008645371,0.0006385927,0.0021425742],"genre_scores_gemma":[0.842543,0.000015928921,0.15421778,0.0005841244,0.000698034,0.00037165426,0.000020058138,0.00008442987,0.0014649571],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996053,0.0000066212033,0.00009461951,0.000084625615,0.00007225808,0.00013656322],"domain_scores_gemma":[0.9996954,0.00013791269,0.000015932173,0.00010085455,0.000028235248,0.000021659132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020271695,0.00007073741,0.000059887352,0.00006103607,0.00008376996,0.000040956147,0.00008220291,0.0001270578,0.00007513686],"category_scores_gemma":[0.000030698,0.000053820222,0.000051429248,0.00027378835,0.000013608419,0.000047763486,0.0000058089736,0.00017756705,0.000029827726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022059308,0.0000073982255,0.0021444075,0.00014181093,0.00014985872,0.0000024138287,0.00032904383,0.35084903,0.08622357,0.094668,0.10266856,0.36279383],"study_design_scores_gemma":[0.00022508716,0.000007024868,0.0005709176,0.000020664796,0.000023069844,0.0000029872488,0.00018156668,0.7518269,0.044748962,0.003141188,0.19912776,0.00012388601],"about_ca_topic_score_codex":0.000009239605,"about_ca_topic_score_gemma":0.000002043321,"teacher_disagreement_score":0.81665117,"about_ca_system_score_codex":0.000027268512,"about_ca_system_score_gemma":0.00001270167,"threshold_uncertainty_score":0.2194725},"labels":[],"label_agreement":null},{"id":"W4380372743","doi":"10.1108/ecam-12-2022-1121","title":"Schedule compression and emerging waste in construction: an assessment of overlapping activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Compression (physics); Computer science; Operations management; Engineering","score_opus":0.006656517620452095,"score_gpt":0.2399072260888694,"score_spread":0.2332507084684173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380372743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9619999,0.00005750549,0.034851428,0.000047126927,0.0011447067,0.00022301388,0.000006129748,0.000558294,0.0011118854],"genre_scores_gemma":[0.9676349,0.00007854878,0.03208304,0.0000032882685,0.00009479586,0.000045592496,0.000016872158,0.000025242176,0.000017709031],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892217,0.00002772065,0.00035822458,0.00023597052,0.00020606954,0.0002498612],"domain_scores_gemma":[0.99964863,0.000033891818,0.000056028322,0.00017960499,0.000018454171,0.00006339458],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013304585,0.00020610284,0.00022537973,0.0007719566,0.000073265546,0.000044880606,0.000084598694,0.00005954966,0.000026888583],"category_scores_gemma":[0.0000046557307,0.00022107987,0.000044071665,0.0005696217,0.00009284577,0.0002959748,0.00005981053,0.00023793076,0.0000013249991],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009343115,0.000007765171,0.004239888,0.0004331782,0.00008357818,0.0000063534703,0.00032117183,0.7053861,0.022886146,0.026224898,0.000012292912,0.24038929],"study_design_scores_gemma":[0.00077312964,0.000044161512,0.050097357,0.00037723745,0.000027548138,0.00012718352,0.003971277,0.93837374,0.0045557856,0.00071175117,0.00054024934,0.0004005626],"about_ca_topic_score_codex":0.000008738571,"about_ca_topic_score_gemma":0.000006107013,"teacher_disagreement_score":0.23998871,"about_ca_system_score_codex":0.000076435805,"about_ca_system_score_gemma":0.000007857199,"threshold_uncertainty_score":0.90153754},"labels":[],"label_agreement":null},{"id":"W4380761118","doi":"10.52842/conf.caadria.2023.2.401","title":"Annotation on Interactive Design Data in Design Analytics Tools","year":2023,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Computer-Aided Architectural Design Research in Asia","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Analytics; Annotation; Data science; Visual analytics; Data analysis; Human–computer interaction; Artificial intelligence; Data mining; Visualization","score_opus":0.29582616041530807,"score_gpt":0.3757933936378712,"score_spread":0.0799672332225631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380761118","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5716627,0.0000307937,0.39670902,0.010062688,0.0027782873,0.004355743,0.0001286642,0.00062678417,0.013645281],"genre_scores_gemma":[0.98632306,0.00003924426,0.013276363,0.000034244673,0.000118498705,0.00009151748,0.0000221001,0.000024788875,0.00007018778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99747735,0.00018186982,0.0005052703,0.00045506528,0.0009878792,0.00039256603],"domain_scores_gemma":[0.9978298,0.0012552697,0.00011246452,0.00026012753,0.00047939675,0.00006293922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020486533,0.00022415645,0.00023244818,0.0013358276,0.000077229975,0.00028151023,0.0017508223,0.00008397334,0.000027701508],"category_scores_gemma":[0.0005304974,0.00017893258,0.000051139996,0.0013129647,0.00014191143,0.0004994402,0.00030620347,0.00096013927,0.00004239456],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014107561,0.00015870525,0.00070605765,0.00010687663,0.00015689751,0.000023173385,0.001540155,0.54120886,0.060012896,0.05177619,0.0053292043,0.33757025],"study_design_scores_gemma":[0.00042842465,0.00026413432,0.005464915,0.0006656813,0.0000030470007,0.000016715165,0.00026433473,0.9331156,0.028073194,0.031495534,0.0000416638,0.00016675823],"about_ca_topic_score_codex":0.00003219211,"about_ca_topic_score_gemma":0.000014131811,"teacher_disagreement_score":0.41466033,"about_ca_system_score_codex":0.00031434323,"about_ca_system_score_gemma":0.000120134995,"threshold_uncertainty_score":0.7296659},"labels":[],"label_agreement":null},{"id":"W4380929354","doi":"10.1016/j.autcon.2023.104980","title":"Computer vision applications in offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Alberta Innovates","keywords":"Field (mathematics); Computer science; Computer technology; Machine vision; Point (geometry); Computer Applications; Risk analysis (engineering); Engineering management; Engineering; Systems engineering; Artificial intelligence; Multimedia","score_opus":0.0059844435924937805,"score_gpt":0.22620193324628818,"score_spread":0.2202174896537944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380929354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88895166,0.00004651666,0.10272592,0.00017976869,0.0022090334,0.0006030129,0.000014190509,0.0020424896,0.003227399],"genre_scores_gemma":[0.9870873,0.00009502694,0.012195828,0.000016203943,0.00016323358,0.00021398018,0.00017372589,0.000025741065,0.00002895325],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876416,0.000051600426,0.0005277556,0.0002490066,0.00018445935,0.00022302395],"domain_scores_gemma":[0.99956924,0.00006426939,0.00007236528,0.00019144488,0.000060277132,0.000042381173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018988347,0.00016471582,0.00017541667,0.0010210588,0.00008124605,0.00006531468,0.00008148602,0.00017859237,0.00008022347],"category_scores_gemma":[0.000008944936,0.00018718898,0.00004634728,0.0018385013,0.00010584047,0.0005574795,0.000016432956,0.0002166864,0.00022086047],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010976749,0.000023542558,0.05001308,0.00009711091,0.000015911037,0.0000034744962,0.00039528226,0.06460914,0.002731831,0.05483284,0.000854437,0.8264124],"study_design_scores_gemma":[0.0009155519,0.00003183452,0.239706,0.00012294526,0.00000969162,0.00012416822,0.000921442,0.7397287,0.0014004422,0.009167618,0.007479469,0.00039215744],"about_ca_topic_score_codex":0.000027286746,"about_ca_topic_score_gemma":0.00011451673,"teacher_disagreement_score":0.82602024,"about_ca_system_score_codex":0.00020598502,"about_ca_system_score_gemma":0.000026206359,"threshold_uncertainty_score":0.7633345},"labels":[],"label_agreement":null},{"id":"W4380990663","doi":"10.5539/jms.v13n2p29","title":"Modular Coordination—Architectural Design Associated to a BIM Application","year":2023,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Interoperability; Personalization; Systems engineering; Rationalization (economics); Flexibility (engineering); Process management; Computer science; Prefabrication; Process (computing); Manufacturing engineering; Software engineering; Engineering; Engineering management; World Wide Web; Operating system; Civil engineering","score_opus":0.006827844371734187,"score_gpt":0.22169617584327694,"score_spread":0.21486833147154275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380990663","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54111356,0.000041215044,0.4571671,0.0009821303,0.000119294906,0.00028601507,6.7670095e-7,0.000081911814,0.00020813984],"genre_scores_gemma":[0.9990013,0.000017199685,0.00068675977,0.000017218203,0.00003072778,0.000018556839,0.0000017220451,0.0000058035744,0.00022071713],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9994357,0.000043128493,0.0002086122,0.00006748062,0.00013765115,0.00010741506],"domain_scores_gemma":[0.99959654,0.000033008568,0.000043859793,0.000071057446,0.00020806197,0.000047482084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006048893,0.00006281395,0.0000938189,0.0002408737,0.00005472457,0.000034839562,0.00006239077,0.00003254932,0.000004865976],"category_scores_gemma":[0.000075018186,0.000054974917,0.000035316745,0.00043353983,0.000016046974,0.00010070591,0.00001842101,0.000085364125,0.0000027544006],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007275218,0.000042518826,0.010474331,0.00027803166,0.00019760568,0.000016369344,0.00075894647,0.29605034,0.00020945123,0.012276963,0.0040123416,0.67561036],"study_design_scores_gemma":[0.0009960539,0.00021215102,0.513708,0.000035018722,0.00009490537,0.00001932771,0.004333994,0.3529917,0.0002721672,0.114302434,0.012748186,0.00028609685],"about_ca_topic_score_codex":0.0000031101765,"about_ca_topic_score_gemma":0.0000029171774,"teacher_disagreement_score":0.67532426,"about_ca_system_score_codex":0.00017286293,"about_ca_system_score_gemma":0.00001260031,"threshold_uncertainty_score":0.2241812},"labels":[],"label_agreement":null},{"id":"W4381052724","doi":"10.1108/sasbe-01-2023-0006","title":"Modeling relational performance of the supply chains for prefabricated housebuilding in New Zealand","year":2023,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Originality; Supply chain; Sustainability; Quality (philosophy); Prefabrication; Business; Architectural engineering; Marketing; Engineering; Civil engineering; Creativity","score_opus":0.009964841075414387,"score_gpt":0.18513036520791765,"score_spread":0.17516552413250325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381052724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99375015,0.00012536156,0.00546352,0.00020905885,0.00005891433,0.0002498985,0.0000028247077,0.000038503356,0.000101767706],"genre_scores_gemma":[0.9949639,0.00023861277,0.00023197057,0.0000057160746,0.000024802666,0.000036143967,0.000009098213,0.000011478405,0.004478291],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994946,0.000007001603,0.0001455105,0.00008940863,0.00008120476,0.00018224682],"domain_scores_gemma":[0.99985135,0.000015097033,0.000014832516,0.00008762711,0.0000070793562,0.000024003675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012846848,0.000067708745,0.00007316503,0.00007396696,0.00007295248,0.000008256198,0.000045734872,0.000044166838,0.000009698797],"category_scores_gemma":[0.000006882219,0.00005582378,0.00002339515,0.00012426576,0.000019934592,0.00008635777,0.000030049066,0.000065678025,0.0000012031686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016424001,0.000005481123,0.07985767,0.00007436925,0.000010506502,3.0788883e-7,0.00042954384,0.91104656,0.00072631874,0.003956078,0.00043189988,0.0034448123],"study_design_scores_gemma":[0.00035999244,0.000020155803,0.055822995,0.000020136627,0.000006859186,0.0000014521672,0.00043839563,0.9356424,0.0007496014,0.0010130068,0.0058474545,0.000077513636],"about_ca_topic_score_codex":0.000084967614,"about_ca_topic_score_gemma":0.000014974807,"teacher_disagreement_score":0.024595853,"about_ca_system_score_codex":0.00007417258,"about_ca_system_score_gemma":0.000023983155,"threshold_uncertainty_score":0.22764277},"labels":[],"label_agreement":null},{"id":"W4382042904","doi":"10.1007/978-3-031-35368-0_6","title":"Innovative Construction Practices","year":2023,"lang":"en","type":"book-chapter","venue":"The urban book series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Prefabrication; Mass customization; Adaptability; Architectural engineering; Demographics; Personalization; Resource (disambiguation); Product (mathematics); Engineering; Resource consumption; Consumption (sociology); Production (economics); Affordable housing; Business; Construction engineering; Computer science; Civil engineering; Marketing; Economics","score_opus":0.01885513633821258,"score_gpt":0.21489844744124895,"score_spread":0.19604331110303636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382042904","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00004230192,0.0012025369,0.0003771051,0.00027025954,0.003109127,0.00029061185,0.00006859488,0.0009123958,0.9937271],"genre_scores_gemma":[0.0017055818,0.0013026128,0.00021908029,0.00012221042,0.000936984,0.000059605867,0.0001035959,0.00013559058,0.99541473],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907666,0.000012878793,0.0003243406,0.0002155375,0.00021156644,0.00015900597],"domain_scores_gemma":[0.9990867,0.00005940467,0.000307614,0.0003085094,0.00020672136,0.00003106738],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0000903313,0.00030879784,0.0002251178,0.00015054771,0.00016762961,0.000108313194,0.00014813337,0.00029857914,0.00040018253],"category_scores_gemma":[0.000015621632,0.00025764867,0.00007276582,0.000101080615,0.00034398603,0.0004419051,0.000032555687,0.0005320252,0.00054709654],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024533978,0.000001232729,0.00002599256,0.000068619505,0.0002454337,0.0000057236202,0.00032748037,0.00003938708,0.00012085843,0.91214603,0.074262224,0.012732496],"study_design_scores_gemma":[0.00007296812,0.00003349892,0.000029665862,0.00008561026,0.000046620447,0.0000948848,0.0002725497,0.000057011828,0.00020316034,0.017691849,0.9811227,0.0002895076],"about_ca_topic_score_codex":0.00000818293,"about_ca_topic_score_gemma":0.00015676656,"teacher_disagreement_score":0.9068605,"about_ca_system_score_codex":0.00007565972,"about_ca_system_score_gemma":0.00006972883,"threshold_uncertainty_score":0.9999876},"labels":[],"label_agreement":null},{"id":"W4382246289","doi":"10.18280/ijsdp.180619","title":"Exploring the Challenges and Opportunities of BIM Implementation in Major Architectural Projects in Iraq","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Building information modeling; Environmental planning; Engineering; Construction engineering; Business; Engineering management; Environmental resource management; Operations management; Environmental science","score_opus":0.09593294253108951,"score_gpt":0.2800778277186633,"score_spread":0.18414488518757377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382246289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99804175,0.0010724749,0.00007137268,0.00034273634,0.00018288985,0.0000550577,5.125908e-7,0.000008140443,0.00022509447],"genre_scores_gemma":[0.9986952,0.0010219059,0.0001995024,0.0000067275914,0.000037758033,0.000011938466,0.0000029846644,0.000004023509,0.000019981182],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99945974,0.000014521176,0.00025987058,0.000039224808,0.00013287942,0.00009377858],"domain_scores_gemma":[0.9997726,0.000050538845,0.000059338592,0.000014821864,0.000088375484,0.000014337749],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033346456,0.000053017615,0.000074230324,0.0005782567,0.000021054258,0.000024678606,0.000056332807,0.0000129904865,0.0000022636486],"category_scores_gemma":[0.00001591196,0.000041454598,0.000008735623,0.00008384301,0.000015494232,0.0002805494,0.000021635426,0.00009265258,9.057635e-8],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009226722,0.000008512211,0.021928055,0.00019932256,0.00011534475,0.00055876025,0.123995945,0.003869603,0.0002475383,0.022595055,0.00003589594,0.8263537],"study_design_scores_gemma":[0.00077595713,0.000029604926,0.4597101,0.00031956244,0.0000044301137,0.000136958,0.53172964,0.0010097284,0.002280721,0.0023689698,0.0015223753,0.000111987014],"about_ca_topic_score_codex":0.000015171162,"about_ca_topic_score_gemma":0.000026489206,"teacher_disagreement_score":0.82624173,"about_ca_system_score_codex":0.000049534527,"about_ca_system_score_gemma":0.00004517223,"threshold_uncertainty_score":0.16904695},"labels":[],"label_agreement":null},{"id":"W4382400439","doi":"10.1061/jcemd4.coeng-12764","title":"Practitioners’ Concerns about Their Liability toward BIM Collaborative Digital Mockups: Case Study in Civil Engineering","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Liability; CLARITY; Asset (computer security); Context (archaeology); Process (computing); Work (physics); Building information modeling; Exploratory research; Legal liability; Knowledge management; Computer science; Business; Engineering ethics; Engineering; Computer security; Sociology; Operations management; Accounting","score_opus":0.010828764562692262,"score_gpt":0.22624843424984611,"score_spread":0.21541966968715384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382400439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97332895,0.00020880863,0.023693357,0.00006302034,0.0016165556,0.00032930207,0.000016978953,0.00024907026,0.00049396866],"genre_scores_gemma":[0.99853706,0.0003926736,0.00086588133,0.000003173689,0.00013047014,0.000028671095,0.0000030218027,0.000021393615,0.000017657465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899495,0.000016670549,0.0004938972,0.00013832856,0.00017526088,0.00018090819],"domain_scores_gemma":[0.99953926,0.00006060511,0.00009679488,0.00010776236,0.00011110094,0.000084462015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026414936,0.00018714169,0.00024615065,0.00059739745,0.000041072843,0.00013106625,0.000062104686,0.000058600617,0.000011819617],"category_scores_gemma":[0.00003322784,0.00017900101,0.000054825086,0.0007154417,0.000030032958,0.00057434733,0.000027345392,0.00025843264,0.0000026653026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003895581,0.00009617966,0.006916424,0.00049472996,0.00067731907,0.0017967424,0.00484871,0.91967803,0.0003136465,0.00519388,0.00042705418,0.059518352],"study_design_scores_gemma":[0.008080396,0.00084378215,0.039516073,0.0010740401,0.00036217688,0.016968802,0.21309134,0.6658568,0.00085637736,0.0008339305,0.05064496,0.0018713308],"about_ca_topic_score_codex":0.0000062168874,"about_ca_topic_score_gemma":0.000015599504,"teacher_disagreement_score":0.25382122,"about_ca_system_score_codex":0.00013389289,"about_ca_system_score_gemma":0.000017933033,"threshold_uncertainty_score":0.72994494},"labels":[],"label_agreement":null},{"id":"W4382537193","doi":"10.1061/jcemd4.coeng-13637","title":"Measurement of Information Loss and Transfer Impacts of Technology Systems in Offsite Construction Processes","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Interoperability; Building information modeling; Documentation; Process (computing); Information transfer; Systems engineering; Information system; Risk analysis (engineering); Construction management; Productivity; Engineering; Information technology; Computer science; Construction engineering; Civil engineering; Operations management","score_opus":0.004386788376904425,"score_gpt":0.17144924000667444,"score_spread":0.16706245162977001,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382537193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9385799,0.0012829201,0.059002724,0.000055222492,0.00073692994,0.0001641529,0.000004401031,0.00006849608,0.00010522311],"genre_scores_gemma":[0.9954141,0.0030442076,0.0015109135,7.9681115e-7,0.000016752498,0.0000059816293,8.107585e-7,0.0000055808914,8.989417e-7],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991419,0.0000064632545,0.0005264174,0.000045281227,0.00019052884,0.00008944333],"domain_scores_gemma":[0.99960625,0.000008182252,0.00010086578,0.000049633243,0.00020520308,0.000029885538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024038214,0.00008932066,0.00019840524,0.0011200885,0.000013044093,0.000015964866,0.000035119927,0.00006330862,0.0000011611654],"category_scores_gemma":[0.000020572681,0.00008581649,0.000021610866,0.0005789751,0.000057494522,0.00033886326,0.000007634667,0.000095313066,2.4988032e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014382442,0.0000358972,0.02004951,0.018782914,0.00080201897,0.000016714699,0.0012112622,0.38733557,0.023464384,0.09108814,0.000109415145,0.45696035],"study_design_scores_gemma":[0.026015105,0.0021658824,0.27300853,0.028227808,0.0016763294,0.013286972,0.062709026,0.3406129,0.1838658,0.0050408635,0.06011045,0.0032803242],"about_ca_topic_score_codex":0.000004346312,"about_ca_topic_score_gemma":0.000002454937,"teacher_disagreement_score":0.45368004,"about_ca_system_score_codex":0.00004228543,"about_ca_system_score_gemma":0.000016943433,"threshold_uncertainty_score":0.3499495},"labels":[],"label_agreement":null},{"id":"W4382539372","doi":"10.18280/mmep.100305","title":"A Comprehensive Analysis of BIM Technology's Critical Role in Assessing Cost for Complex Dam Construction Projects","year":2023,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction engineering; Engineering; Building information modeling; Systems engineering; Civil engineering; Computer science; Operations management","score_opus":0.04588149244804591,"score_gpt":0.27007489741616025,"score_spread":0.22419340496811435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382539372","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22627436,0.000093698116,0.7728557,0.000041618827,0.00005928263,0.00022273262,0.000010641589,0.0003512759,0.000090695576],"genre_scores_gemma":[0.92267215,0.000030155417,0.07710548,0.0000016949705,0.00001211776,0.00013693876,0.000018596436,0.000020573085,0.0000022907914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916357,0.0000062965623,0.00035254392,0.0001625403,0.000092215836,0.00022285002],"domain_scores_gemma":[0.9995463,0.00020952914,0.000023624643,0.00010798736,0.00007246503,0.000040084393],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012248264,0.00013459781,0.00034304554,0.0008229077,0.00003843195,0.00004139288,0.000051634473,0.00012909932,0.000004579468],"category_scores_gemma":[0.000042246324,0.00013437933,0.000058992853,0.001207043,0.00007416791,0.000096321586,0.000014510676,0.00014258859,0.0000016352307],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001791783,0.0000113813385,0.00013012334,0.0007282678,0.000090224494,3.992216e-7,0.00020795589,0.9385874,0.005125072,0.052446842,0.0000025880393,0.0026679162],"study_design_scores_gemma":[0.00015145246,0.000014084707,0.000114049,0.00018328523,0.000100314406,0.000007207937,0.00044852227,0.98052406,0.0004988044,0.01774814,0.00008025652,0.0001298298],"about_ca_topic_score_codex":0.000003709372,"about_ca_topic_score_gemma":0.0000012004459,"teacher_disagreement_score":0.6963978,"about_ca_system_score_codex":0.000026006002,"about_ca_system_score_gemma":0.00000717874,"threshold_uncertainty_score":0.547983},"labels":[],"label_agreement":null},{"id":"W4382582499","doi":"10.1088/1742-6596/2530/1/011001","title":"Preface","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Publishing; Library science; Engineering; Engineering ethics; Political science; Computer science; Law","score_opus":0.01922238055430596,"score_gpt":0.22180955488047238,"score_spread":0.2025871743261664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382582499","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8353748,0.0001905825,0.13420014,0.00074196095,0.0039478363,0.0000893132,0.000014289753,0.0004511928,0.024989923],"genre_scores_gemma":[0.9989955,0.0001540438,0.0002871278,0.000005531377,0.00020545998,9.4691353e-7,0.0000011446546,0.0000062786967,0.0003439895],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996696,0.0000062377503,0.00013372727,0.000025548263,0.00009728517,0.00006761464],"domain_scores_gemma":[0.99974126,0.000009107567,0.000043987187,0.000047635676,0.00013234277,0.000025641068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042358723,0.000050751358,0.00008473619,0.000035232035,0.000022735141,0.00003610172,0.000064359825,0.000022766737,0.00004377052],"category_scores_gemma":[0.0000066346097,0.00004336853,0.00003825128,0.00014896972,0.000026879006,0.00037482037,0.0000055827177,0.00010712199,0.000041212465],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019575218,0.000009653545,0.0004961098,0.00005969519,0.00009107797,0.000009378661,0.0015806268,0.0076908837,0.07463641,0.22483684,0.008618781,0.681951],"study_design_scores_gemma":[0.0003824834,0.00017879452,0.005325963,0.00014109108,0.00003600687,0.00011420885,0.0029109675,0.005614181,0.8074024,0.13980104,0.037796523,0.000296375],"about_ca_topic_score_codex":4.883655e-7,"about_ca_topic_score_gemma":0.0000017503179,"teacher_disagreement_score":0.732766,"about_ca_system_score_codex":0.000010826137,"about_ca_system_score_gemma":0.00003108536,"threshold_uncertainty_score":0.17685175},"labels":[],"label_agreement":null},{"id":"W4382680959","doi":"10.11159/iccste23","title":"Proceedings of the 8th International Conferenceon Civil, Structural and Transportation Engineering (ICCSTE 2023)","year":2023,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Computer science; Engineering ethics; Construction engineering; Engineering management; Civil engineering; Aeronautics","score_opus":0.013058005742124812,"score_gpt":0.21553056280869307,"score_spread":0.20247255706656825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382680959","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9835141,0.00020340749,0.000106848056,0.00048097508,0.0072208513,0.0007432725,0.0013757794,0.00018183376,0.0061729853],"genre_scores_gemma":[0.9969598,0.0005441041,0.00020386172,0.000016857259,0.0002909837,0.000093043076,0.00021489827,0.00007719668,0.0015992358],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974743,0.000002807231,0.0009204719,0.00048403215,0.0008146705,0.000303695],"domain_scores_gemma":[0.9985097,0.000049251095,0.00048577823,0.00010156793,0.0007576425,0.000096041345],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011314864,0.0005926967,0.0005165945,0.00037650162,0.000113437156,0.00019193199,0.00073444645,0.00033913096,0.00030546618],"category_scores_gemma":[0.00004155553,0.00045111997,0.00021768191,0.0003982987,0.00015038377,0.0005771003,0.0000304624,0.0007634036,0.000005663181],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051419984,0.00004773007,0.01747278,0.008581986,0.0031176228,0.0000033841945,0.007350255,0.07065656,0.39036357,0.4809296,0.012217866,0.00874442],"study_design_scores_gemma":[0.0038349992,0.00028435435,0.4151646,0.009828535,0.00080383697,0.00010112958,0.0026894656,0.43409956,0.11229294,0.006324958,0.011281455,0.0032941697],"about_ca_topic_score_codex":0.000077897894,"about_ca_topic_score_gemma":0.00015940567,"teacher_disagreement_score":0.47460467,"about_ca_system_score_codex":0.00010182293,"about_ca_system_score_gemma":0.000051753723,"threshold_uncertainty_score":0.99979407},"labels":[],"label_agreement":null},{"id":"W4383682086","doi":"10.35490/ec3.2023.264","title":"A blockchain-based approach for managing construction claims","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Unavailability; Ambiguity; Blockchain; Computer science; Risk analysis (engineering); Quality (philosophy); Trustworthiness; Reliability (semiconductor); Process (computing); Computer security; Information management; Process management; Knowledge management; Business; Reliability engineering; Engineering","score_opus":0.014524235546994703,"score_gpt":0.22444583556680964,"score_spread":0.20992160001981494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682086","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38910222,0.000039504754,0.6040517,0.000061952655,0.002193106,0.00037341172,0.0000076003134,0.0013809759,0.0027895009],"genre_scores_gemma":[0.92233205,0.0000052104024,0.07720409,0.000021801789,0.00027316288,0.000056133653,0.00005708974,0.000034921224,0.000015560707],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99881935,0.000033018714,0.0003853207,0.0002967431,0.00013726715,0.00032828044],"domain_scores_gemma":[0.9995312,0.00010503695,0.00006776974,0.00017222266,0.00007561913,0.00004815241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027399656,0.00018627598,0.00019937972,0.00057286693,0.00016908647,0.000060201408,0.000098207056,0.00015090754,0.000010023545],"category_scores_gemma":[0.000023369752,0.00021797264,0.000087001856,0.00090728956,0.00012817205,0.000045281453,0.000014866334,0.00021909835,0.000012076462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015451893,0.0000072712623,0.0052006,0.00015212911,0.000018856645,0.0000010842156,0.00011681462,0.710168,0.0008272942,0.013966642,0.00021243487,0.26931342],"study_design_scores_gemma":[0.00070691796,0.000016964252,0.00094751286,0.000060078226,0.000012089937,0.000059483307,0.0007206265,0.9915924,0.0012964888,0.003970061,0.00039201806,0.00022536854],"about_ca_topic_score_codex":0.000007566993,"about_ca_topic_score_gemma":0.0000048953525,"teacher_disagreement_score":0.5332298,"about_ca_system_score_codex":0.00014301464,"about_ca_system_score_gemma":0.000034208148,"threshold_uncertainty_score":0.88886666},"labels":[],"label_agreement":null},{"id":"W4383682303","doi":"10.35490/ec3.2023.263","title":"Human-Data Interaction (HDI) and blockchain: an exploration of the open research challenges for the construction community","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Immutability; Blockchain; Transparency (behavior); Computer science; Corporate governance; Data science; Computer security; Business","score_opus":0.41693402393856127,"score_gpt":0.4230731833766217,"score_spread":0.006139159438060426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682303","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9885728,0.00018904857,0.0063950736,0.0006991314,0.0021185062,0.0009228159,0.000018369761,0.0001770035,0.0009072967],"genre_scores_gemma":[0.9985013,0.00015354894,0.001067373,0.0000058026185,0.00017156157,0.00004402119,0.000032147076,0.00001699828,0.000007230075],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986307,0.00045046658,0.00036248734,0.0002099756,0.00017284085,0.00017353114],"domain_scores_gemma":[0.9985185,0.0004973415,0.00010827972,0.00065682153,0.0001949112,0.000024112253],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022978089,0.00011032538,0.00014359145,0.00021085195,0.00084689003,0.00012785134,0.0005980939,0.00010548299,0.000003999422],"category_scores_gemma":[0.00015330705,0.00008595177,0.000024326799,0.00056277955,0.0003965595,0.0006500683,0.00035256485,0.0005633159,0.0000011362773],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026507585,0.000028341963,0.002014358,0.00018675528,0.000046258097,1.5224168e-7,0.004809206,0.018799214,0.002171194,0.06290617,0.00027454222,0.9087373],"study_design_scores_gemma":[0.001028466,0.0001370377,0.028968483,0.00040352682,0.00003485667,0.000097942604,0.09178033,0.8216457,0.0030987798,0.05055261,0.0019837804,0.00026851415],"about_ca_topic_score_codex":0.00022895496,"about_ca_topic_score_gemma":0.0010772554,"teacher_disagreement_score":0.9084688,"about_ca_system_score_codex":0.00007108167,"about_ca_system_score_gemma":0.00003114394,"threshold_uncertainty_score":0.6513679},"labels":[],"label_agreement":null},{"id":"W4383682627","doi":"10.35490/ec3.2023.237","title":"Comparative analysis of room generation methods using rule language-based evaluation in BIM","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Simulated annealing; Constraint (computer-aided design); Jump; Representation (politics); Search algorithm; Grid; Computer engineering; Algorithm; Engineering; Mathematics","score_opus":0.06852078058170981,"score_gpt":0.3937417046821252,"score_spread":0.3252209241004154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682627","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7595852,0.00008243928,0.23933838,0.0000048419083,0.00056428177,0.00012825409,0.0000036144163,0.00010091577,0.0001920865],"genre_scores_gemma":[0.95060116,0.0000027005553,0.04921609,0.0000035224211,0.00005545003,0.000007771978,0.00010544477,0.000006966427,8.691553e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988125,0.0002596488,0.00044379925,0.0001773422,0.00017392986,0.00013277719],"domain_scores_gemma":[0.999507,0.00013043507,0.00010234528,0.00012871732,0.000113240596,0.000018253744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088496564,0.000106993444,0.0002775713,0.0015032806,0.000041505242,0.00002311211,0.000050924486,0.00009065862,0.00003486184],"category_scores_gemma":[0.000056467514,0.00012364163,0.00006525024,0.0033359954,0.00004067435,0.00010824522,0.000009814649,0.00013115637,0.0000024232227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000031711638,0.00000492875,0.017604219,0.000012569976,0.00005323858,3.4359383e-7,0.0007641739,0.8725909,0.038823523,0.00032014778,0.0000036948563,0.06981906],"study_design_scores_gemma":[0.00030958577,0.0000057619104,0.033884153,0.000034397464,0.000106103354,0.0000019285483,0.0012915914,0.939751,0.02438209,0.0001293416,0.000003796596,0.00010022927],"about_ca_topic_score_codex":0.00012093157,"about_ca_topic_score_gemma":0.00026111538,"teacher_disagreement_score":0.191016,"about_ca_system_score_codex":0.0002200444,"about_ca_system_score_gemma":0.000051908286,"threshold_uncertainty_score":0.5041959},"labels":[],"label_agreement":null},{"id":"W4383823788","doi":"10.11159/iccste23.141","title":"Sustainability Cement Block Selection Based On IntervalValued Hesitant Fuzzy Group Analysis For Construction Industry Problems","year":2023,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Selection (genetic algorithm); Block (permutation group theory); Construction industry; Group (periodic table); Fuzzy set; Cement; Computer science; Fuzzy logic; Artificial intelligence; Engineering; Construction engineering; Mathematics; Chemistry; Materials science; Composite material","score_opus":0.01407349407508257,"score_gpt":0.22347070899502694,"score_spread":0.20939721491994437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383823788","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9943468,0.000004254418,0.0035111208,0.0005921997,0.0005339229,0.00042020596,0.00008392033,0.00022681676,0.00028076392],"genre_scores_gemma":[0.9992442,0.0000075366956,0.0004655147,0.000015883084,0.000054728633,0.0001103204,0.00006166666,0.000015464855,0.000024680252],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99895984,0.0000030932151,0.00035104036,0.00023219595,0.0002949478,0.00015888289],"domain_scores_gemma":[0.9993589,0.000032786473,0.00010952239,0.000052160805,0.00040209602,0.000044530523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001297816,0.00018773954,0.00017784462,0.00036789125,0.0000855717,0.000066040506,0.00014511953,0.00012434166,0.000027966209],"category_scores_gemma":[0.000032647153,0.00015412025,0.000119114564,0.00059317134,0.00004150966,0.00019137718,0.000004944284,0.00024380465,3.496068e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017343978,0.000020846182,0.03958884,0.00058116845,0.0005312114,2.1911752e-7,0.00043278458,0.7311527,0.043268476,0.17953072,0.00006531429,0.004654267],"study_design_scores_gemma":[0.0004599277,0.00012614962,0.141503,0.0001253045,0.00013765927,0.0000020736043,0.00039078313,0.8380415,0.013946557,0.0049514463,0.00010671738,0.00020890283],"about_ca_topic_score_codex":0.000016532307,"about_ca_topic_score_gemma":0.00004563794,"teacher_disagreement_score":0.17457928,"about_ca_system_score_codex":0.00012887594,"about_ca_system_score_gemma":0.000018346864,"threshold_uncertainty_score":0.62848413},"labels":[],"label_agreement":null},{"id":"W4383876955","doi":"10.24928/2023/0257","title":"Lean Construction and Building Information Modeling (BIM) in Design Management: Survey Results From French Companies","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Computer science; Construction engineering; Knowledge management; Business; Engineering; Operations management","score_opus":0.03741784460179708,"score_gpt":0.23262975154321286,"score_spread":0.19521190694141577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383876955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73629445,0.0000144344895,0.25997558,0.00010375875,0.0019661852,0.00032857616,0.0006871393,0.00013578836,0.00049409736],"genre_scores_gemma":[0.98823476,0.00009568545,0.01108882,0.000013268239,0.000064768756,0.00003139531,0.0004385796,0.000011596955,0.000021141437],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99875253,0.000036899983,0.00059375307,0.00019500655,0.00026087556,0.00016092596],"domain_scores_gemma":[0.99913967,0.00016910295,0.00016954614,0.0001510777,0.00034057867,0.000030040119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004518428,0.00016235068,0.0001718069,0.00036551128,0.000103188126,0.00010796191,0.00024399527,0.00010455218,0.000011028626],"category_scores_gemma":[0.00013772957,0.00015445684,0.000054968103,0.0003249129,0.00014400108,0.00093421014,0.00006473591,0.00016539956,0.0000038729313],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006595673,0.000027310914,0.015558898,0.00015365193,0.00041859143,0.0000011044142,0.003379245,0.33839497,0.00321323,0.26294422,0.0009996144,0.37424958],"study_design_scores_gemma":[0.0014416885,0.000033553795,0.014183378,0.00019856353,0.000027648755,0.000018589122,0.0046598953,0.9271414,0.0022819354,0.04926116,0.0005050292,0.00024712383],"about_ca_topic_score_codex":0.0007323707,"about_ca_topic_score_gemma":0.00035389757,"teacher_disagreement_score":0.5887464,"about_ca_system_score_codex":0.00008763768,"about_ca_system_score_gemma":0.0000227492,"threshold_uncertainty_score":0.6298567},"labels":[],"label_agreement":null},{"id":"W4383877022","doi":"10.24928/2023/0203","title":"Development of an Optimization Model Based on Business Process Re-Engineering to Minimize Construction Projects Delay","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Computer science; Process (computing); Industrial engineering; Manufacturing engineering; Systems engineering; Engineering; Operating system","score_opus":0.023694626744490528,"score_gpt":0.24078833681937115,"score_spread":0.21709371007488062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383877022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4140767,9.723229e-7,0.58370924,0.00010797497,0.0011921187,0.0003469165,0.00009558566,0.0001498342,0.0003206607],"genre_scores_gemma":[0.8478454,0.0000018943093,0.15178035,0.000019859175,0.00006365669,0.000112256595,0.00012773041,0.000024572557,0.000024324572],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987515,0.000010482418,0.00047767407,0.00022948998,0.0003759401,0.00015492197],"domain_scores_gemma":[0.9985615,0.000040763898,0.00016538537,0.00017788094,0.0010063568,0.000048097107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017951198,0.00017901255,0.00017685378,0.00038997253,0.000086780565,0.000039330844,0.0002937737,0.00010576686,0.000019106237],"category_scores_gemma":[0.00013388021,0.0001634661,0.00006377038,0.00053674076,0.00007362843,0.0003840908,0.00002478313,0.0001054415,0.0000019526337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011916946,0.000020081941,0.00014637971,0.00009324432,0.000035854744,1.1303291e-7,0.00065483135,0.9664372,0.004434819,0.006210782,0.000036931808,0.021810591],"study_design_scores_gemma":[0.0004303848,0.000036877747,0.00036421564,0.00019320055,0.000016670796,0.000008465274,0.0015469705,0.9739962,0.022688283,0.0004417152,0.000105221705,0.00017175416],"about_ca_topic_score_codex":0.0000054280567,"about_ca_topic_score_gemma":0.000016884396,"teacher_disagreement_score":0.43376866,"about_ca_system_score_codex":0.00010067678,"about_ca_system_score_gemma":0.00016427525,"threshold_uncertainty_score":0.6665954},"labels":[],"label_agreement":null},{"id":"W4383957461","doi":"10.24928/2023/0149","title":"Promoting the IPD Delivery Method in Construction Projects: A BIM-Based Smart Contract Approach","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Integrated project delivery; Construction engineering; Computer science; Smart contract; Process management; Systems engineering; Engineering management; Business; Engineering; Computer security; Project management; Blockchain","score_opus":0.02621325410979069,"score_gpt":0.2493493027006428,"score_spread":0.2231360485908521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957461","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85607195,0.000034397177,0.13496186,0.0010374264,0.0038254207,0.0012452215,0.00022497613,0.00033271173,0.002266057],"genre_scores_gemma":[0.9886669,0.00001711897,0.010770476,0.000053902764,0.00014698987,0.00020078439,0.00008388638,0.00002276053,0.000037181697],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985818,0.00008018826,0.0005117253,0.00026021,0.00033999147,0.00022608512],"domain_scores_gemma":[0.9988411,0.0002223065,0.00021820117,0.00022106814,0.00046719363,0.000030140727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006203664,0.00019284431,0.00020187093,0.00028204324,0.00014288977,0.000090679496,0.00041393953,0.00013348984,0.000027559941],"category_scores_gemma":[0.0001882614,0.00014068694,0.00016142322,0.0005235523,0.00026080702,0.00038985684,0.000042921798,0.0003044397,0.000004425428],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004067999,0.000114463175,0.029990632,0.00040637574,0.00041628443,0.000001889191,0.0043495297,0.017768888,0.026644677,0.38606843,0.0008409819,0.53299105],"study_design_scores_gemma":[0.0014588499,0.000082980776,0.006052318,0.00025089865,0.000058279184,0.00013938427,0.008397653,0.9484913,0.01816772,0.0138185825,0.0027508356,0.00033124437],"about_ca_topic_score_codex":0.00014008551,"about_ca_topic_score_gemma":0.00013756249,"teacher_disagreement_score":0.93072236,"about_ca_system_score_codex":0.00012840418,"about_ca_system_score_gemma":0.00011413735,"threshold_uncertainty_score":0.57370466},"labels":[],"label_agreement":null},{"id":"W4383957518","doi":"10.24928/2023/0123","title":"Factors Influencing Cycle Times in Offsite Construction","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workstation; Computer science; Framing (construction); Process (computing); Schedule; Identification (biology); Process management; Reliability engineering; Operations management; Engineering; Operating system","score_opus":0.018240678264771784,"score_gpt":0.23057161489420955,"score_spread":0.21233093662943775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99123126,0.000010564839,0.0026602342,0.00015410833,0.0032648493,0.00021472642,0.0001372584,0.00019018589,0.0021368188],"genre_scores_gemma":[0.99895525,0.000018435583,0.0006682088,0.000014171855,0.00009989649,0.000027419814,0.00006353365,0.000016098991,0.00013698735],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99900967,0.000016262016,0.00039101526,0.00017475885,0.00023973585,0.00016856345],"domain_scores_gemma":[0.99935466,0.000075573334,0.00012463465,0.00014270688,0.00027298843,0.000029440562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013659803,0.00015040523,0.00016057024,0.0003009892,0.00007518257,0.00004807516,0.00026864326,0.000105948115,0.0000859355],"category_scores_gemma":[0.00008450606,0.0001273763,0.00011579255,0.00036177787,0.00018488572,0.00047941,0.000041437626,0.00016543744,0.000009692414],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013032593,0.00003843669,0.20193104,0.0001640126,0.0002987027,0.0000011641758,0.004165766,0.021649621,0.031771038,0.49591994,0.0018723361,0.2420576],"study_design_scores_gemma":[0.0040525715,0.0002566565,0.33803904,0.0009776122,0.00014338692,0.00017359272,0.062055122,0.2511314,0.12524195,0.19250748,0.023751736,0.0016694703],"about_ca_topic_score_codex":0.0000693227,"about_ca_topic_score_gemma":0.00014391914,"teacher_disagreement_score":0.30341247,"about_ca_system_score_codex":0.00011063827,"about_ca_system_score_gemma":0.000039283354,"threshold_uncertainty_score":0.5194255},"labels":[],"label_agreement":null},{"id":"W4384433961","doi":"10.5220/0012004900003546","title":"Managing Trade-off Between Cost and Time in Project Scheduling Problems Using Discrete Event Simulation","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Discrete event simulation; Computer science; Scheduling (production processes); Job shop scheduling; Distributed computing; Real-time computing; Parallel computing; Embedded system; Simulation; Mathematical optimization; Routing (electronic design automation); Mathematics","score_opus":0.027792388957515124,"score_gpt":0.2757980651736847,"score_spread":0.2480056762161696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384433961","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8893495,0.000083392755,0.10798348,0.00012784517,0.00010592991,0.0004744477,0.000004678865,0.0004972839,0.0013734314],"genre_scores_gemma":[0.99864966,0.000022189948,0.001152626,0.0000041717544,0.000053166525,0.000013340917,0.000020728317,0.000016340817,0.00006779856],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994733,0.000014781644,0.0001791355,0.00011415253,0.00007691582,0.00014174626],"domain_scores_gemma":[0.9998676,0.000033245098,0.000016289858,0.00005470555,0.00000649023,0.000021670967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012824002,0.000083344494,0.000092521725,0.0002001405,0.000043571847,0.000043284264,0.000026198528,0.000049361806,0.0000123019745],"category_scores_gemma":[0.0000061674577,0.00007969765,0.000017691546,0.00034895973,0.000011752891,0.0002010433,0.000011376095,0.00009320513,0.000010988324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001153238,9.888464e-7,0.005833415,0.000040004532,0.000010015525,5.925253e-7,0.00026765073,0.9317838,0.0013832495,0.00014463028,0.0000054967436,0.060528982],"study_design_scores_gemma":[0.00014921275,0.000005386015,0.004968186,0.00007693828,0.000007790426,0.0000014608423,0.00016619898,0.9936108,0.00028434192,0.00042236745,0.00020637186,0.000100931575],"about_ca_topic_score_codex":0.000031508273,"about_ca_topic_score_gemma":0.0000183052,"teacher_disagreement_score":0.10930013,"about_ca_system_score_codex":0.00005294869,"about_ca_system_score_gemma":0.000007955079,"threshold_uncertainty_score":0.32499757},"labels":[],"label_agreement":null},{"id":"W4384692292","doi":"10.3846/jcem.2023.19215","title":"EXPLORING EFFECT OF DIFFERENT RESOURCE QUALITIES ON PROCESS EFFICIENCY IN CONSTRUCTION PILE INSTALLATION","year":2023,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Pile; Work (physics); Process (computing); Resource (disambiguation); Engineering; Field (mathematics); Section (typography); Originality; Civil engineering; Construction engineering; Architectural engineering; Computer science; Mechanical engineering; Structural engineering","score_opus":0.01593281110756711,"score_gpt":0.2130934328799562,"score_spread":0.19716062177238908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384692292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9949526,0.000076188364,0.002983811,0.000017373986,0.0004211666,0.00008526447,6.835762e-7,0.00006471184,0.0013982083],"genre_scores_gemma":[0.9994406,0.00044435187,0.000034294473,0.0000011690909,0.00004242428,0.000013154738,0.000001122841,0.000009969607,0.000012880325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993824,0.000014457646,0.00028500464,0.00005631492,0.00016725097,0.0000946155],"domain_scores_gemma":[0.9998004,0.000048808484,0.000058146117,0.000050364302,0.000017155953,0.000025143776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022279256,0.000091405826,0.0001570052,0.00051322556,0.000015176072,0.00001438305,0.00003977964,0.000022954366,0.0000030860208],"category_scores_gemma":[0.0000147809815,0.000076994176,0.000033263223,0.0002429673,0.000011588088,0.00012797018,0.000008453899,0.00010612128,5.5591863e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044858494,0.000011777622,0.0008322531,0.0012620871,0.00005387068,0.00000657899,0.00081803737,0.9589482,0.0008086512,0.0047473875,0.000053925334,0.032412387],"study_design_scores_gemma":[0.008212667,0.0028995841,0.12543999,0.008718807,0.00028991094,0.00017044424,0.013446327,0.75479925,0.0748716,0.0013024317,0.008479039,0.0013699265],"about_ca_topic_score_codex":8.6332426e-7,"about_ca_topic_score_gemma":0.000004203388,"teacher_disagreement_score":0.20414892,"about_ca_system_score_codex":0.000041201565,"about_ca_system_score_gemma":0.0000019106333,"threshold_uncertainty_score":0.31397316},"labels":[],"label_agreement":null},{"id":"W4385297687","doi":"10.1162/99608f92.9ba2bd43","title":"Reinforcing Reproducibility and Replicability: An Introduction","year":2023,"lang":"en","type":"article","venue":"Harvard Data Science Review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"National Science Foundation","keywords":"Reproducibility; Computer science; Statistics; Mathematics","score_opus":0.052198051255793125,"score_gpt":0.3084426474261471,"score_spread":0.25624459617035394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385297687","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82443535,0.046937056,0.029562812,0.039686035,0.017098814,0.008303,0.0009130643,0.016718874,0.016344981],"genre_scores_gemma":[0.6624819,0.31852967,0.013586145,0.00088194024,0.0023042012,0.00021265254,0.0014482522,0.00007668198,0.000478575],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983351,0.000028778835,0.0002689758,0.0009932687,0.00020557974,0.00016824472],"domain_scores_gemma":[0.9960387,0.000014354924,0.000031202548,0.003752819,0.00007969008,0.0000832699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059181824,0.00007893746,0.00013768152,0.00007464103,0.00014306778,0.00008277071,0.00038521597,0.000020818565,0.0001344396],"category_scores_gemma":[0.0016374008,0.0000680292,0.000012853169,0.0012007658,0.00023017672,0.0022200646,0.00016122288,0.00009765709,0.0001789891],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000010355775,0.0000036589229,0.0005533761,0.0013494676,0.0000029659388,4.3640608e-7,0.000031431246,0.000059193717,0.0036376158,0.0045777173,0.012644504,0.9771386],"study_design_scores_gemma":[0.00004748447,0.000025594507,0.0076861177,0.00030060648,0.000030140012,0.00007124254,0.00004674256,0.045159064,0.0011226622,0.00068635674,0.94461876,0.00020521898],"about_ca_topic_score_codex":0.000008917291,"about_ca_topic_score_gemma":0.000005150107,"teacher_disagreement_score":0.97693336,"about_ca_system_score_codex":0.000040237977,"about_ca_system_score_gemma":0.000046239835,"threshold_uncertainty_score":0.27741504},"labels":[],"label_agreement":null},{"id":"W4385303665","doi":"10.18280/acsm.470307","title":"Characterization of Lightweight Mortars with Cork and Olive Stone Waste for Old Building Rehabilitation","year":2023,"lang":"en","type":"article","venue":"Annales de Chimie Science des Matériaux","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cork; Mortar; Characterization (materials science); Waste management; Engineering; Environmental science; Archaeology; Materials science; Geography; Composite material","score_opus":0.013604536626115816,"score_gpt":0.2374142748064994,"score_spread":0.22380973818038358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385303665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9676358,0.00002605459,0.03173271,0.000072996154,0.00011817058,0.00017898093,0.000017552118,0.00010987158,0.00010785645],"genre_scores_gemma":[0.9888424,0.000115967414,0.010876652,0.000013660199,0.000041466268,0.00003973228,0.000015758696,0.000011664079,0.00004267743],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993726,0.000008297609,0.00014931687,0.00015126898,0.00013873057,0.00017979402],"domain_scores_gemma":[0.99959946,0.000056888395,0.000049943636,0.000097566655,0.00014348573,0.000052636828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025600375,0.00008137096,0.000097697484,0.00022870308,0.0001387701,0.000047657904,0.0000821491,0.000032195785,0.0000048451107],"category_scores_gemma":[0.000058206897,0.000070377566,0.000020503932,0.0005957901,0.00035532206,0.00042117378,0.000011532801,0.000041852898,0.0000024566443],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031866748,0.00000912307,0.0061768014,0.00031132525,0.000015501962,5.5818316e-7,0.0024055985,0.004632514,0.9537268,0.020534344,0.000055731714,0.012099836],"study_design_scores_gemma":[0.0005999438,0.00042439785,0.20622543,0.0005649626,0.00004445174,0.00003174209,0.0026345286,0.32878095,0.4518405,0.007944972,0.00051804987,0.00039011118],"about_ca_topic_score_codex":0.0000055825594,"about_ca_topic_score_gemma":0.000008326533,"teacher_disagreement_score":0.5018863,"about_ca_system_score_codex":0.000038852377,"about_ca_system_score_gemma":0.000040575596,"threshold_uncertainty_score":0.2869914},"labels":[],"label_agreement":null},{"id":"W4385501671","doi":"10.3311/ccc2023-010","title":"SIMULATION-BASED OPTIMIZATION OF PATH PLANNING FOR CAMERA-EQUIPPED UAV CONSIDERING CONSTRUCTION ACTIVITIES","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Motion planning; Zoom; Data collection; Schedule; Visibility; Path (computing); Real-time computing; Computer vision; Artificial intelligence; Robot; Engineering","score_opus":0.021502472318450278,"score_gpt":0.24998499718779787,"score_spread":0.2284825248693476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385501671","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10475255,0.000017195733,0.89298165,0.000020822023,0.00048061012,0.00017990504,0.00002023486,0.0005859168,0.00096111366],"genre_scores_gemma":[0.9711248,0.000003435013,0.028635137,0.000012242514,0.00005130779,0.000040671013,0.00006859153,0.000019966563,0.00004384341],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945766,0.000010172675,0.00022332161,0.00009816863,0.000089730405,0.0001209421],"domain_scores_gemma":[0.9993951,0.00037351396,0.000051087773,0.000080906066,0.000076033364,0.00002336045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006665648,0.00009502278,0.00012397411,0.00018076386,0.0000710162,0.000023926388,0.00002848221,0.00007131108,0.000077239776],"category_scores_gemma":[0.00006441397,0.0001002761,0.00004813155,0.00022164598,0.000043008044,0.0001710296,0.000003903475,0.00004864358,0.0000021912188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015050493,0.0000021291023,0.00096780166,0.00006504656,0.00001809757,1.7540951e-7,0.000103751845,0.9907666,0.0019268267,0.0014110777,0.000099182245,0.0046242927],"study_design_scores_gemma":[0.00032058192,0.000022882712,0.00009406109,0.000038612663,0.000011946864,7.7498487e-7,0.0008425007,0.98534214,0.012802905,0.00022402543,0.00019486729,0.00010466796],"about_ca_topic_score_codex":0.000006018163,"about_ca_topic_score_gemma":0.0000020701166,"teacher_disagreement_score":0.8663722,"about_ca_system_score_codex":0.000030968222,"about_ca_system_score_gemma":0.000028921206,"threshold_uncertainty_score":0.40891406},"labels":[],"label_agreement":null},{"id":"W4385548192","doi":"10.3311/ccc2023-056","title":"AUTOMATE AND STANDARDIZE MULTI-STORY BUILDING SCHEDULES THROUGH REPETITIVE SPATIOTEMPORAL MODEL","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Schedule; Computer science; Standardization; Gantt chart; Representation (politics); Focus (optics); Construct (python library); Industrial engineering; Software engineering; Operations research; Systems engineering; Engineering; Programming language","score_opus":0.02372812014783634,"score_gpt":0.2624719724684359,"score_spread":0.23874385232059955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385548192","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47496456,0.00012872931,0.51942855,0.00010876734,0.00025925765,0.00007424803,0.000022789858,0.0014983892,0.003514693],"genre_scores_gemma":[0.915213,0.00011816147,0.08424237,0.00002194314,0.000032732492,0.000014425117,0.000007527486,0.0000179451,0.00033189636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955815,0.000008497151,0.00010643743,0.00012370915,0.00008590146,0.00011727612],"domain_scores_gemma":[0.9998223,0.000016351685,0.0000139662325,0.00008372999,0.000035525776,0.000028116076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000089186455,0.0000881504,0.000087077555,0.000057822763,0.000081393286,0.000032979548,0.000029536994,0.000060487637,0.000028918023],"category_scores_gemma":[0.000015013736,0.00008295854,0.000024357627,0.00011101096,0.00004013873,0.00023875677,0.000015416013,0.000095214345,0.00002008018],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023561735,0.000016115342,0.0034619684,0.00021111894,0.00016791573,0.000013564341,0.0026209804,0.26642746,0.030872928,0.6165739,0.0050274935,0.07458299],"study_design_scores_gemma":[0.00021640609,0.0000060692087,0.001525969,0.000023865756,0.000005966201,0.0000034730583,0.00039378455,0.9840009,0.009751152,0.002737308,0.001212654,0.00012243706],"about_ca_topic_score_codex":0.00002019284,"about_ca_topic_score_gemma":0.000027109536,"teacher_disagreement_score":0.71757346,"about_ca_system_score_codex":0.00003917431,"about_ca_system_score_gemma":0.000015883928,"threshold_uncertainty_score":0.3382951},"labels":[],"label_agreement":null},{"id":"W4385602267","doi":"10.1007/978-3-031-34159-5_39","title":"Lateral Behavior of a 12-story Modular Building Structure with Vertically Unconstrained Inter-modular Connections, Including a Grouted Slip-resistant Mechanism","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Modular design; Structural engineering; Slip (aerodynamics); Engineering; Computer science","score_opus":0.009895611249299142,"score_gpt":0.19704743527991458,"score_spread":0.18715182403061545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385602267","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09055742,0.0007362028,0.90031993,0.00007564724,0.0032987173,0.0011176049,0.0003334262,0.0018976402,0.0016633958],"genre_scores_gemma":[0.99335486,0.000033811983,0.005761298,0.0000147507535,0.00022280692,0.00006417669,0.00008314174,0.00028567173,0.00017949122],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979597,0.00001900496,0.0006646073,0.00051707355,0.000381858,0.00045777115],"domain_scores_gemma":[0.99903905,0.00018364664,0.00012830866,0.00041961024,0.00011720906,0.00011219543],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014509461,0.00073422637,0.00076816895,0.0008915139,0.000077223005,0.000056958073,0.0002508529,0.0007807486,0.00012819385],"category_scores_gemma":[0.00009789529,0.00073006965,0.00017908742,0.00023335307,0.00007809216,0.00014925432,0.00007019615,0.0015135204,0.000002911208],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082903825,0.000015934796,0.00007819381,0.0009118985,0.00060436944,0.00019844147,0.00054426905,0.5742377,0.34360176,0.073854715,0.000009442059,0.0058603603],"study_design_scores_gemma":[0.005317086,0.00096011447,0.0010663247,0.015087023,0.0017962236,0.0009396176,0.00009239726,0.7773242,0.122919865,0.06454994,0.0030012636,0.006945966],"about_ca_topic_score_codex":0.000031234613,"about_ca_topic_score_gemma":0.0013816685,"teacher_disagreement_score":0.9027974,"about_ca_system_score_codex":0.0004683938,"about_ca_system_score_gemma":0.00006828929,"threshold_uncertainty_score":0.99951506},"labels":[],"label_agreement":null},{"id":"W4385602292","doi":"10.1007/978-3-031-34159-5_7","title":"Behaviour of Beam–Column Connection of Modular Steel Buildings","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Modular design; Prefabrication; Structural engineering; Engineering; Structural system; Robustness (evolution); Process (computing); Computer science","score_opus":0.008012438800936918,"score_gpt":0.1887587897647091,"score_spread":0.1807463509637722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385602292","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05929793,0.004892205,0.8858475,0.000051047668,0.008848146,0.0013407255,0.00033832106,0.0022233804,0.037160736],"genre_scores_gemma":[0.99732834,0.00021178415,0.0011372713,0.0000038304033,0.000183263,0.000022279413,0.00004478152,0.00016800889,0.0009004253],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878716,0.000003392692,0.0005415996,0.00023279506,0.00023489408,0.00020016723],"domain_scores_gemma":[0.9993776,0.00012066862,0.00011269118,0.00026195473,0.000087588385,0.00003948766],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000105079656,0.00033611376,0.00049541035,0.0005784331,0.000014219029,0.000011530349,0.00013875969,0.0005786384,0.000105068444],"category_scores_gemma":[0.000069509624,0.00039614743,0.00016421535,0.00016866924,0.000033710145,0.00007044352,0.00002666166,0.00060683873,0.000005462285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006609991,0.0000051840943,0.00011811425,0.00057854125,0.00010004634,0.0000053981603,0.00014423717,0.9604418,0.020091526,0.011184605,0.000028647957,0.007295275],"study_design_scores_gemma":[0.0023741783,0.000556456,0.0031520408,0.009671579,0.00072241673,0.00015988007,0.0000473699,0.5859905,0.3428105,0.03707049,0.013309185,0.0041353903],"about_ca_topic_score_codex":0.00003947501,"about_ca_topic_score_gemma":0.00040258758,"teacher_disagreement_score":0.9380304,"about_ca_system_score_codex":0.0001293564,"about_ca_system_score_gemma":0.000020692438,"threshold_uncertainty_score":0.999849},"labels":[],"label_agreement":null},{"id":"W4385602321","doi":"10.1007/978-3-031-34159-5","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Victoria; University of Regina; University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Political science; Engineering; Engineering ethics; Civil society; Library science; Law; Computer science","score_opus":0.006193766170441778,"score_gpt":0.17616169732987416,"score_spread":0.16996793115943237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385602321","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044954,0.027304668,0.34773815,0.0026136497,0.060579956,0.012196134,0.007273404,0.010932311,0.48640773],"genre_scores_gemma":[0.99467814,0.00019497509,0.0007846547,0.00002273907,0.0004028795,0.00006400111,0.00004028024,0.00022282753,0.0035894967],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984398,0.0000030060203,0.0005174699,0.00026899492,0.00035220748,0.00041854865],"domain_scores_gemma":[0.9992564,0.00012070415,0.00010831235,0.00022186952,0.00019841825,0.000094323725],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016681566,0.00043310848,0.00050146494,0.0003894674,0.000040922994,0.00003503776,0.00040598624,0.00069884286,0.00009108271],"category_scores_gemma":[0.00012464331,0.00041322605,0.0002532284,0.00061258406,0.00006065146,0.0001104263,0.000059178616,0.001250613,0.0000030015947],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029465468,0.0000059889912,0.00032424374,0.0028270609,0.00025107613,0.000002304478,0.0028016889,0.9723804,0.006932543,0.004152344,0.007901617,0.002417785],"study_design_scores_gemma":[0.0007375704,0.000074325166,0.0023035454,0.006706607,0.00019767715,0.000063301566,0.00012608332,0.899853,0.024568476,0.004060701,0.059175357,0.0021333736],"about_ca_topic_score_codex":0.0010189727,"about_ca_topic_score_gemma":0.1315754,"teacher_disagreement_score":0.94972414,"about_ca_system_score_codex":0.0006251743,"about_ca_system_score_gemma":0.00035953746,"threshold_uncertainty_score":0.999832},"labels":[],"label_agreement":null},{"id":"W4385720491","doi":"10.1061/9780784485033.043","title":"Inspection Prioritization Framework and Implementation for Combined, Sanitary, and Storm Sewers","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hamilton Health Sciences; Aecom (Canada)","funders":"","keywords":"Sanitary sewer; Prioritization; Storm; Computer science; Environmental science; Environmental planning; Engineering; Geology; Environmental engineering; Management science; Oceanography","score_opus":0.007661955119420242,"score_gpt":0.2494246872288251,"score_spread":0.24176273210940485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385720491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8468514,0.000085624815,0.15049385,0.00020959997,0.00065255474,0.00032877995,0.0000119921215,0.00083783775,0.0005283593],"genre_scores_gemma":[0.99740857,0.00018812812,0.0021636777,0.000025228645,0.000066016575,0.000041657724,0.000060975373,0.000010269725,0.00003550609],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972916,0.0000035924713,0.00008532238,0.00007346748,0.00004117826,0.00006726533],"domain_scores_gemma":[0.99988216,0.000026613143,0.000009890878,0.000033093696,0.000026946262,0.00002127257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000046140194,0.00005053427,0.000043023825,0.00007589523,0.0000807947,0.000033259654,0.000009948313,0.000044918284,0.000020952442],"category_scores_gemma":[0.0000075578673,0.000052746997,0.000008483002,0.00012946702,0.000013107187,0.00014633972,0.000004160609,0.000036777023,0.000003197889],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042057123,0.000010074052,0.048298385,0.00028175762,0.000088526445,5.150973e-7,0.0029636566,0.0008305127,0.007136838,0.39262167,0.020222057,0.52750397],"study_design_scores_gemma":[0.0035393059,0.0005475845,0.38976774,0.0000947038,0.00011114598,0.000034239958,0.027338678,0.42864704,0.014578628,0.11266192,0.02178067,0.0008983569],"about_ca_topic_score_codex":0.000022098078,"about_ca_topic_score_gemma":0.00015483113,"teacher_disagreement_score":0.5266056,"about_ca_system_score_codex":0.000022771648,"about_ca_system_score_gemma":0.0000035746089,"threshold_uncertainty_score":0.21509601},"labels":[],"label_agreement":null},{"id":"W4385723933","doi":"10.1108/ecam-05-2022-0394","title":"Facilitating the building commissioning process using building information modeling: an action-research project","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Project commissioning; Building information modeling; Process (computing); Action research; Action plan; Plan (archaeology); Process management; Engineering; Systems engineering; Computer science; Engineering management; Publishing; Operations management; Management","score_opus":0.06907814646562467,"score_gpt":0.34494219836169293,"score_spread":0.2758640518960683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385723933","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6822172,0.000026813957,0.3146526,0.00004640638,0.0009607479,0.00046972788,0.000006228939,0.0013031848,0.00031715038],"genre_scores_gemma":[0.96605086,0.000016504457,0.033499263,0.000007828902,0.00019671104,0.00015087915,0.000027432216,0.000037804173,0.000012713414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981071,0.00007794615,0.0004685491,0.00025156612,0.0005530946,0.00054177496],"domain_scores_gemma":[0.9993098,0.000111506364,0.00005467054,0.000292636,0.00014713641,0.00008427272],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069010374,0.00026620374,0.00016300411,0.0010901392,0.0007589969,0.00033789888,0.00028591513,0.0000838179,0.000013523767],"category_scores_gemma":[0.00008049586,0.00022857352,0.00007310359,0.0017109436,0.000074658456,0.0010152037,0.00008536,0.00066079915,0.000030884312],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006975494,0.0000020727387,0.00004404563,0.00021194566,0.000047818092,0.0000011490191,0.0012365297,0.8778955,0.002937147,0.003533633,0.000023164268,0.11406006],"study_design_scores_gemma":[0.00019575832,0.00001794261,0.00012638273,0.00014960035,0.000019323941,0.000088644425,0.00915411,0.9864267,0.00094703876,0.0009726354,0.0016403771,0.00026146614],"about_ca_topic_score_codex":0.00004944765,"about_ca_topic_score_gemma":0.0000041777566,"teacher_disagreement_score":0.2838337,"about_ca_system_score_codex":0.0002188181,"about_ca_system_score_gemma":0.000030887808,"threshold_uncertainty_score":0.93209577},"labels":[],"label_agreement":null},{"id":"W4385753057","doi":"10.1016/j.autcon.2023.105052","title":"Digitalization-based process improvement and decision-making in offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Process (computing); Tacit knowledge; Computer science; Building information modeling; Engineering; Industrial engineering; Knowledge management; Operations management","score_opus":0.005055209206338137,"score_gpt":0.23405203043466175,"score_spread":0.2289968212283236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385753057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93130744,0.000030240486,0.06582031,0.00005531808,0.0009711268,0.00030906897,0.000009306684,0.0007148317,0.00078237214],"genre_scores_gemma":[0.99424404,0.00003273863,0.00548684,0.000020563419,0.00004029777,0.00010668165,0.000045558125,0.000020426143,0.0000028749196],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988088,0.000019730309,0.00051789667,0.00024457584,0.00021328036,0.00019569912],"domain_scores_gemma":[0.99956566,0.000107672284,0.000087603345,0.00012494044,0.00008021111,0.000033893793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017611234,0.00015893308,0.00015843335,0.00092836097,0.00007373788,0.00010387915,0.000053674303,0.00013678957,0.0000468209],"category_scores_gemma":[0.000067217465,0.00018067023,0.000026104291,0.0013727556,0.00009397482,0.0006251183,0.000010101687,0.00013431223,0.000020456528],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015264717,0.000008621622,0.061395932,0.00010061252,0.000007295125,0.0000022908953,0.000240065,0.09457921,0.0005210829,0.0048685283,0.000041089254,0.83822],"study_design_scores_gemma":[0.00083945825,0.000023048782,0.06576905,0.00033395016,0.0000070960787,0.000039434282,0.0011329864,0.9083712,0.0011351806,0.021962998,0.00012759773,0.00025799632],"about_ca_topic_score_codex":0.000010987975,"about_ca_topic_score_gemma":0.00010984695,"teacher_disagreement_score":0.83796203,"about_ca_system_score_codex":0.00017365687,"about_ca_system_score_gemma":0.000049095455,"threshold_uncertainty_score":0.73675185},"labels":[],"label_agreement":null},{"id":"W4385859374","doi":"10.1007/978-3-031-34593-7_6","title":"Enhanced Activity-on-Node Network Diagramming Method for Construction Planning and Scheduling Applications","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Unavailability; Workflow; Computer science; Factoring; Duration (music); Distributed computing; Probabilistic logic; Operations research; Engineering; Industrial engineering; Artificial intelligence; Reliability engineering; Operations management","score_opus":0.012293146992358613,"score_gpt":0.24087647290257375,"score_spread":0.22858332591021513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859374","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000066005196,0.00084669667,0.99234897,0.00003127405,0.0010621834,0.0005722693,0.000024199726,0.0007234449,0.004324934],"genre_scores_gemma":[0.4513572,0.000658731,0.5394053,0.000098100994,0.004521812,0.0018599078,0.0002245943,0.00086729036,0.0010070695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987817,0.000007063218,0.00031571518,0.00040991348,0.00013541487,0.00035022286],"domain_scores_gemma":[0.9987232,0.00086698774,0.000080210506,0.00022215494,0.00004141702,0.00006601529],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016611538,0.0004338013,0.00041877126,0.0003552658,0.0001030003,0.00006721336,0.000093200615,0.0005511984,0.000011290948],"category_scores_gemma":[0.00008138888,0.00050019793,0.00008988627,0.00015432035,0.000028176966,0.00008142533,0.00002344597,0.0008300122,0.000005194556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007381724,0.0000011174957,0.0000042559736,0.0002303208,0.000058683836,0.0000010056386,0.00006410377,0.7965792,0.0024195875,0.018188117,0.0000059444233,0.1824403],"study_design_scores_gemma":[0.0004968742,0.000047748577,0.000029998593,0.0016021964,0.000109338514,0.000034064025,0.000009544968,0.9366781,0.012181498,0.03507232,0.012625084,0.0011132008],"about_ca_topic_score_codex":0.000003121498,"about_ca_topic_score_gemma":0.00007054262,"teacher_disagreement_score":0.45294368,"about_ca_system_score_codex":0.000146828,"about_ca_system_score_gemma":0.000019624424,"threshold_uncertainty_score":0.99974495},"labels":[],"label_agreement":null},{"id":"W4385859382","doi":"10.1007/978-3-031-34593-7_8","title":"Envisioning Digital Twin-Enabled Post-occupancy Evaluations for UVic Engineering Expansion Project","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; University of Victoria","funders":"","keywords":"Context (archaeology); Certification; Sustainability; Architectural engineering; Plan (archaeology); Process (computing); Systems engineering; Engineering management; Engineering; Computer science; Construction engineering","score_opus":0.014323624633849355,"score_gpt":0.2354696908345159,"score_spread":0.22114606620066657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00077687897,0.0019022332,0.97871286,0.00006187315,0.00402657,0.0017600409,0.00033793406,0.0028108086,0.009610789],"genre_scores_gemma":[0.97309405,0.00041528713,0.012025783,0.00006070394,0.0024565074,0.001112781,0.0018770682,0.0015396149,0.007418191],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997712,0.000005297644,0.0007184755,0.0005672398,0.00039913462,0.00059782283],"domain_scores_gemma":[0.9985824,0.0006217458,0.00008995207,0.00044228323,0.00017072695,0.00009286177],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00019825649,0.0007759056,0.000617893,0.0011954353,0.0000869321,0.00020192763,0.00025116614,0.000749636,0.00010874966],"category_scores_gemma":[0.0005779995,0.0008415846,0.00030907124,0.0003061525,0.000025202056,0.00034485623,0.000057903435,0.0010004735,0.00006751865],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013670282,0.000006430424,0.000013242976,0.0006351778,0.00014032754,0.000012114357,0.00030900683,0.94897413,0.003882742,0.0039472748,0.00013261827,0.04193325],"study_design_scores_gemma":[0.00078929565,0.00010914555,0.0000834913,0.0022008966,0.00012707256,0.00005124827,0.0000141166975,0.96692115,0.0016343459,0.0034814817,0.023034016,0.0015537384],"about_ca_topic_score_codex":0.000006807317,"about_ca_topic_score_gemma":0.00010835447,"teacher_disagreement_score":0.97231716,"about_ca_system_score_codex":0.00039866095,"about_ca_system_score_gemma":0.00009914493,"threshold_uncertainty_score":0.9994035},"labels":[],"label_agreement":null},{"id":"W4385859424","doi":"10.1007/978-3-031-34593-7_26","title":"Gordie Howe International Bridge Managing a Pile of Paper on a Paperless Project","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Aecom (Canada)","funders":"","keywords":"Documentation; Workflow; Bridge (graph theory); Scope (computer science); Computer science; Process (computing); World Wide Web; Architectural engineering; Engineering; Construction engineering; Database","score_opus":0.012808012717697864,"score_gpt":0.2123447554653309,"score_spread":0.19953674274763306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859424","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011694082,0.0024746868,0.22742255,0.00046027248,0.013826671,0.0014238746,0.00037673433,0.0030868386,0.74975896],"genre_scores_gemma":[0.9919669,0.0010424207,0.0008892097,0.00009452221,0.00096599816,0.00010861148,0.00017351504,0.00038651135,0.0043722936],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987437,0.000004866316,0.00040911598,0.00030538152,0.00029183496,0.00024507137],"domain_scores_gemma":[0.999411,0.00016678545,0.00006632545,0.00027407543,0.000048623377,0.000033197226],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000090635906,0.0004059933,0.00038289142,0.00067835045,0.00001833763,0.000035588713,0.00022088141,0.00037016105,0.0001819462],"category_scores_gemma":[0.00005440926,0.0004274905,0.00015818176,0.0001407427,0.000025204645,0.000092298375,0.000042088865,0.00077724067,0.000028820032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003011355,0.000013235718,0.000048432452,0.00076380913,0.0003785127,0.000057339897,0.0005955355,0.8258146,0.002406562,0.039988026,0.000538603,0.12936524],"study_design_scores_gemma":[0.0025669474,0.00031479725,0.0018554346,0.013971116,0.00027912983,0.00016358781,0.000040892253,0.6413125,0.0059044403,0.032906577,0.2958938,0.0047907764],"about_ca_topic_score_codex":0.000028172717,"about_ca_topic_score_gemma":0.00054252526,"teacher_disagreement_score":0.9907975,"about_ca_system_score_codex":0.0001973133,"about_ca_system_score_gemma":0.000025752244,"threshold_uncertainty_score":0.99981767},"labels":[],"label_agreement":null},{"id":"W4385859429","doi":"10.1007/978-3-031-34593-7_42","title":"An Interactive Decision-Support Tool to Improve Construction Cost Management with Building Information Modeling","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Computer science; Interactivity; Software; Facility management; Context (archaeology); Dimension (graph theory); Risk analysis (engineering); Systems engineering; Engineering; World Wide Web; Operations management","score_opus":0.005279538747388388,"score_gpt":0.2048220489249772,"score_spread":0.19954251017758884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859429","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008124701,0.000021556421,0.9854705,0.000013383503,0.001832352,0.00069051824,0.0000417688,0.00077225745,0.010345236],"genre_scores_gemma":[0.8501346,0.00016292819,0.14774019,0.00011371205,0.00055506255,0.00039285232,0.0002765346,0.00034565848,0.00027846554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984762,0.0000034749628,0.00054572005,0.00032972798,0.0003275506,0.00031729744],"domain_scores_gemma":[0.99929285,0.00008035902,0.00007193228,0.0003482555,0.00011153298,0.00009505471],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012487968,0.00048172177,0.00034450015,0.001004679,0.000049609887,0.00016191058,0.00017756027,0.00034983887,0.00007737414],"category_scores_gemma":[0.000035576617,0.00049096154,0.00007157644,0.00021596778,0.000014333562,0.0007082434,0.000042773496,0.0007339064,0.000058296388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026083098,0.0000014198066,0.0000027111287,0.000102583166,0.00006183752,0.000007697833,0.00016396414,0.70779777,0.00013913009,0.0058580497,0.000009226741,0.2858295],"study_design_scores_gemma":[0.0003859972,0.00007868396,0.0000120053355,0.0010538091,0.000053101365,0.000050435887,0.00003317648,0.98889107,0.0005824228,0.003835017,0.0043006656,0.00072359876],"about_ca_topic_score_codex":0.000009087629,"about_ca_topic_score_gemma":0.00019029922,"teacher_disagreement_score":0.84932214,"about_ca_system_score_codex":0.000487071,"about_ca_system_score_gemma":0.000025899835,"threshold_uncertainty_score":0.9997542},"labels":[],"label_agreement":null},{"id":"W4385859480","doi":"10.1007/978-3-031-34593-7","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Victoria; University of Regina; University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Civil society; Political science; Engineering ethics; Engineering; Library science; Computer science; Law","score_opus":0.006193766170441778,"score_gpt":0.17616169732987416,"score_spread":0.16996793115943237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859480","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044954,0.027304668,0.34773815,0.0026136497,0.060579956,0.012196134,0.007273404,0.010932311,0.48640773],"genre_scores_gemma":[0.99467814,0.00019497509,0.0007846547,0.00002273907,0.0004028795,0.00006400111,0.00004028024,0.00022282753,0.0035894967],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984398,0.0000030060203,0.0005174699,0.00026899492,0.00035220748,0.00041854865],"domain_scores_gemma":[0.9992564,0.00012070415,0.00010831235,0.00022186952,0.00019841825,0.000094323725],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016681566,0.00043310848,0.00050146494,0.0003894674,0.000040922994,0.00003503776,0.00040598624,0.00069884286,0.00009108271],"category_scores_gemma":[0.00012464331,0.00041322605,0.0002532284,0.00061258406,0.00006065146,0.0001104263,0.000059178616,0.001250613,0.0000030015947],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029465468,0.0000059889912,0.00032424374,0.0028270609,0.00025107613,0.000002304478,0.0028016889,0.9723804,0.006932543,0.004152344,0.007901617,0.002417785],"study_design_scores_gemma":[0.0007375704,0.000074325166,0.0023035454,0.006706607,0.00019767715,0.000063301566,0.00012608332,0.899853,0.024568476,0.004060701,0.059175357,0.0021333736],"about_ca_topic_score_codex":0.0010189727,"about_ca_topic_score_gemma":0.1315754,"teacher_disagreement_score":0.94972414,"about_ca_system_score_codex":0.0006251743,"about_ca_system_score_gemma":0.00035953746,"threshold_uncertainty_score":0.999832},"labels":[],"label_agreement":null},{"id":"W4385859491","doi":"10.1007/978-3-031-34593-7_38","title":"An Integrated BIM-GIS Dashboard to Improve BIM Coordination","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Dashboard; Context (archaeology); Geographic information system; Engineering; Process management; Engineering management; Construction engineering; Computer science; Operations management; Software engineering; Geography","score_opus":0.007369437346524887,"score_gpt":0.2038492685354579,"score_spread":0.196479831188933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008148107,0.0003795221,0.9770091,0.00014432945,0.005143718,0.00063256355,0.00015114933,0.0030458225,0.012678985],"genre_scores_gemma":[0.9820209,0.00018692942,0.008158514,0.00015194996,0.0016272963,0.0002467172,0.0006797377,0.0008420688,0.0060858577],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836636,0.000008422689,0.00048552768,0.00048364032,0.00026819584,0.00038785825],"domain_scores_gemma":[0.99910897,0.00012502926,0.000054064032,0.00045144756,0.00011461821,0.0001458853],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014006165,0.00060008495,0.00046031797,0.0010388755,0.00003833764,0.00010654543,0.00025974773,0.00076159975,0.0001735687],"category_scores_gemma":[0.00012967188,0.0006403243,0.00012181824,0.0003741322,0.000021113001,0.0001714283,0.000032049433,0.0010623547,0.0001373957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000982301,0.000007054535,0.000013317407,0.00017404028,0.000101504025,0.00001911974,0.00022621143,0.82325256,0.008237663,0.017135844,0.00020311898,0.15061975],"study_design_scores_gemma":[0.00073562894,0.00022058646,0.00016631228,0.0012743671,0.00010939393,0.000033125143,0.000022250513,0.9008302,0.009225747,0.012406525,0.072679505,0.0022963404],"about_ca_topic_score_codex":0.000059912276,"about_ca_topic_score_gemma":0.0017752972,"teacher_disagreement_score":0.9812061,"about_ca_system_score_codex":0.0004170355,"about_ca_system_score_gemma":0.000039405746,"threshold_uncertainty_score":0.9996048},"labels":[],"label_agreement":null},{"id":"W4385859504","doi":"10.1007/978-3-031-34593-7_10","title":"Adoption and Implementation of Common Data Environments in the Province of Quebec: Barriers, Challenges, and Trends","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Operationalization; Asset (computer security); Work (physics); Software deployment; Confusion; Scale (ratio); Knowledge management; Computer science; Frame (networking); Process management; Management science; Data science; Engineering; Computer security; Geography; Software engineering; Psychology","score_opus":0.015443199993396082,"score_gpt":0.22395950527346617,"score_spread":0.2085163052800701,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859504","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19585723,0.38336074,0.3184014,0.0034510228,0.007404181,0.010469003,0.0054268264,0.00198193,0.073647656],"genre_scores_gemma":[0.99422675,0.0052605267,0.0001727857,0.0000039248116,0.00004244586,0.0000123294985,0.00015563557,0.000038231174,0.00008737745],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993139,0.000008956231,0.0002811631,0.00017233168,0.00012802696,0.000095652955],"domain_scores_gemma":[0.9995825,0.00008767388,0.00006050163,0.00024772127,0.0000040650566,0.00001749163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014752013,0.0001710303,0.00021165775,0.00024767415,0.000009000233,0.000008008884,0.00011617474,0.00016858752,0.00001577948],"category_scores_gemma":[0.000011609304,0.00015715469,0.000016531652,0.000045071316,0.000031356423,0.000097391545,0.000043384938,0.00026572516,2.0477839e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007418527,0.000005215118,0.0005201457,0.0008500675,0.000089463196,0.0000059833583,0.0016637852,0.040302612,0.00091278437,0.015332036,0.000021473115,0.940289],"study_design_scores_gemma":[0.00797381,0.0008542743,0.29298562,0.009346545,0.0010441506,0.00026573736,0.0024110763,0.5750601,0.009704997,0.030826755,0.06382665,0.0057002804],"about_ca_topic_score_codex":0.00015198327,"about_ca_topic_score_gemma":0.03094171,"teacher_disagreement_score":0.93458873,"about_ca_system_score_codex":0.00004481667,"about_ca_system_score_gemma":0.000009138071,"threshold_uncertainty_score":0.98674107},"labels":[],"label_agreement":null},{"id":"W4385859505","doi":"10.1007/978-3-031-34593-7_39","title":"Overcoming Obstacles in BIM-Based Multidisciplinary Coordination: A Literature Overview","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Multidisciplinary approach; Scope (computer science); Context (archaeology); Process (computing); Process management; Knowledge management; Situational ethics; Task (project management); Work (physics); Computer science; Management science; Engineering; Systems engineering; Political science; Geography","score_opus":0.014561590291603636,"score_gpt":0.22303084600582035,"score_spread":0.2084692557142167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859505","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071016783,0.14505242,0.7335866,0.0015084817,0.019551547,0.004008025,0.00076688314,0.009449657,0.07897471],"genre_scores_gemma":[0.98951185,0.0015536587,0.0046758754,0.00007068256,0.0008508593,0.00018098294,0.00048427976,0.00057947263,0.002092353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984812,0.000010563185,0.000515648,0.00039454852,0.00025006977,0.00034795923],"domain_scores_gemma":[0.99911827,0.0003871614,0.00006078472,0.00032106653,0.00005162004,0.00006107905],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013742356,0.0005634115,0.0005027259,0.0010228262,0.00003421579,0.000086374646,0.00018353858,0.00079349877,0.000103232334],"category_scores_gemma":[0.000108470056,0.00061500893,0.00016646995,0.00044131707,0.00002303027,0.0001557939,0.000042328444,0.0013427852,0.000025337153],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008271634,0.0000057744332,0.00016667452,0.0011246036,0.000040528143,0.00012149422,0.00040933993,0.9672547,0.0005260617,0.015976021,0.000044827575,0.014321691],"study_design_scores_gemma":[0.0009837116,0.000037523594,0.00082982593,0.011612291,0.000043785123,0.00003856214,0.000009001221,0.9516129,0.0008058169,0.020966925,0.011552575,0.0015070995],"about_ca_topic_score_codex":0.000009441161,"about_ca_topic_score_gemma":0.001359871,"teacher_disagreement_score":0.98241013,"about_ca_system_score_codex":0.0004046728,"about_ca_system_score_gemma":0.00004125975,"threshold_uncertainty_score":0.99963015},"labels":[],"label_agreement":null},{"id":"W4385859536","doi":"10.1007/978-3-031-34593-7_24","title":"Considerations for Site Layout Planning Decision-Making","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Sophistication; Process (computing); Task (project management); Set (abstract data type); Coding (social sciences); Computer science; Engineering; Management science; Process management; Systems engineering","score_opus":0.01649291157112646,"score_gpt":0.23535818400587338,"score_spread":0.21886527243474693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00015601955,0.0014104033,0.97495615,0.000039375736,0.002800055,0.0004169331,0.000121044286,0.0011782199,0.018921798],"genre_scores_gemma":[0.9645237,0.000092884744,0.031967424,0.00009803926,0.0012029869,0.00017115012,0.00011674654,0.00048028058,0.0013468062],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987352,0.0000028548038,0.0004537502,0.00031601448,0.00017846818,0.00031370617],"domain_scores_gemma":[0.99780655,0.0017731377,0.00005337879,0.00025279378,0.000064705826,0.000049439626],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011003077,0.00041949516,0.0003897176,0.0005713822,0.00007383579,0.000094127245,0.00009266258,0.00055094925,0.00016449096],"category_scores_gemma":[0.00047445577,0.00047040833,0.00015574294,0.00009701659,0.000018234321,0.00009357239,0.00002588245,0.00068680936,0.00004132975],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000042500733,0.0000010581806,0.000017787888,0.00013627984,0.000056175617,0.000019131878,0.0002568598,0.97216314,0.00017919039,0.014636698,0.0003679511,0.012161488],"study_design_scores_gemma":[0.00037950947,0.00002872357,0.000058199057,0.003360415,0.000075014425,0.00007174305,0.0000053905346,0.82191455,0.0002446917,0.15406583,0.01875532,0.0010406309],"about_ca_topic_score_codex":0.000001913726,"about_ca_topic_score_gemma":0.00050455995,"teacher_disagreement_score":0.9643677,"about_ca_system_score_codex":0.00017113338,"about_ca_system_score_gemma":0.000033575907,"threshold_uncertainty_score":0.99977475},"labels":[],"label_agreement":null},{"id":"W4385859679","doi":"10.1007/978-3-031-34593-7_4","title":"Virtual Reality-Based Expert Demonstrations for Training Construction Robots via Imitation Learning","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Robot; Task (project management); Human–computer interaction; Computer science; Reinforcement learning; Control (management); Artificial intelligence; Engineering; Systems engineering","score_opus":0.024848157207348048,"score_gpt":0.23021523026941215,"score_spread":0.20536707306206411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000059329574,0.00025575567,0.9902728,0.00011147659,0.0020460107,0.00042292132,0.00003403242,0.0012838367,0.00551384],"genre_scores_gemma":[0.9529956,0.00020361786,0.04113682,0.000076202756,0.0017892498,0.00055303785,0.0013150766,0.0006507109,0.0012797035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841785,0.000013651002,0.0005810176,0.0003939358,0.00023151923,0.0003620127],"domain_scores_gemma":[0.9989214,0.0005938342,0.0001056989,0.00020123013,0.00010017659,0.00007764416],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001860367,0.00049359875,0.00043350304,0.00064739847,0.00011753839,0.000075963304,0.000113194714,0.00071882753,0.00005604751],"category_scores_gemma":[0.00021842559,0.0005948978,0.00019890603,0.0001805527,0.000053341737,0.00015335125,0.000010360719,0.0009459644,0.000012392811],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007835323,0.0000019208894,0.0000035687235,0.00009728007,0.00005346632,0.000002629586,0.00033345315,0.87021136,0.0017810643,0.013556974,0.000026908414,0.11392351],"study_design_scores_gemma":[0.00042196934,0.000064329426,0.000016102676,0.00056913996,0.000046480676,0.00002564996,0.000035768422,0.9847125,0.0010912709,0.0074908854,0.0048649423,0.00066098414],"about_ca_topic_score_codex":0.000012530247,"about_ca_topic_score_gemma":0.0007371134,"teacher_disagreement_score":0.95293623,"about_ca_system_score_codex":0.00028467845,"about_ca_system_score_gemma":0.00007918104,"threshold_uncertainty_score":0.99965024},"labels":[],"label_agreement":null},{"id":"W4385859707","doi":"10.1007/978-3-031-34593-7_30","title":"Axiomatic Design-Based Optimization Framework for Factory Logistics Design in Precast Concrete Construction","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Precast concrete; Factory (object-oriented programming); Axiomatic design; Engineering; Production (economics); Manufacturing engineering; Construction engineering; Materials management; Computer science; Systems engineering; Lean manufacturing; Civil engineering; Operations management","score_opus":0.029998911942959512,"score_gpt":0.21944318824480216,"score_spread":0.18944427630184266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859707","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000005751624,0.0004086417,0.99552304,0.000019095243,0.0018327151,0.00092723407,0.00004574935,0.00068643806,0.0005513458],"genre_scores_gemma":[0.16528289,0.00021432925,0.8326977,0.000036790414,0.00048746908,0.00040099613,0.00022862828,0.00047653855,0.00017465849],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984967,0.000023148787,0.00058747083,0.00035054507,0.0001956044,0.0003465465],"domain_scores_gemma":[0.9977288,0.0017667005,0.000111535424,0.00025904013,0.00007524341,0.000058674654],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022559914,0.00051430875,0.00049505045,0.0007319588,0.000036468322,0.000063585,0.00014493415,0.0010351357,0.00008907388],"category_scores_gemma":[0.0005983816,0.0005937478,0.000110071116,0.00021130327,0.000054263885,0.00008517077,0.000011651481,0.00081055786,0.000008512463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002020891,0.00000109971,0.000006044724,0.00041719616,0.000041066716,0.0000063063476,0.000081351754,0.9865936,0.00014643543,0.0071700704,0.000012573409,0.0055040484],"study_design_scores_gemma":[0.00033490968,0.00004724571,0.0000045099164,0.0012902516,0.00004422593,0.000008996142,0.000003062722,0.9779972,0.0012579393,0.018350475,0.00012455534,0.0005366657],"about_ca_topic_score_codex":0.0000040691257,"about_ca_topic_score_gemma":0.000044240976,"teacher_disagreement_score":0.16527714,"about_ca_system_score_codex":0.00043293406,"about_ca_system_score_gemma":0.00008370404,"threshold_uncertainty_score":0.9996514},"labels":[],"label_agreement":null},{"id":"W4385859750","doi":"10.1007/978-3-031-34593-7_41","title":"Role of Electronic Document Management Systems in the Design Change Management Process","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Document management system; Traceability; Process (computing); Computer science; Process management; Change control; Engineering management; Engineering; Software engineering; Database; Control (management)","score_opus":0.010247605893592316,"score_gpt":0.1965011723764191,"score_spread":0.1862535664828268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859750","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00053449726,0.04064181,0.7400036,0.0001904772,0.0039819325,0.009677143,0.000037338832,0.0018020815,0.20313117],"genre_scores_gemma":[0.99541605,0.002075359,0.00033859222,0.00001859607,0.0002129546,0.0009974238,0.000027024855,0.00015221979,0.0007617838],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986351,0.00001302527,0.00041115275,0.00025477915,0.0003251141,0.0003608429],"domain_scores_gemma":[0.99951786,0.00008280007,0.000059877395,0.0002989225,0.00001959208,0.000020973855],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002824213,0.00036243637,0.00031603064,0.0005922631,0.000016535072,0.00003800774,0.00029338102,0.00023044655,0.000022140364],"category_scores_gemma":[0.000004613426,0.00031665663,0.00007103005,0.0002442897,0.000012760731,0.00006873964,0.00002893805,0.0005550851,0.000012662414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054485904,0.000004733452,0.0000038829608,0.0013789687,0.00013465331,0.000019935604,0.0005781488,0.8869906,0.000034508557,0.08791725,0.000012824845,0.022919012],"study_design_scores_gemma":[0.0017327777,0.00023752313,0.00053688145,0.011078949,0.00048948714,0.00009163262,0.0005382923,0.7934389,0.0014050712,0.14246501,0.045081384,0.0029040761],"about_ca_topic_score_codex":0.00001636823,"about_ca_topic_score_gemma":0.00023317213,"teacher_disagreement_score":0.9948816,"about_ca_system_score_codex":0.0002846538,"about_ca_system_score_gemma":0.000008065067,"threshold_uncertainty_score":0.99992853},"labels":[],"label_agreement":null},{"id":"W4385859875","doi":"10.1007/978-3-031-34593-7_21","title":"Pull-Based Simulation Modelling for Modular Construction Supply Chain Analysis: A Case Study in Northern Canada","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick; University of Toronto","funders":"","keywords":"Modular design; Supply chain; Factory (object-oriented programming); Schedule; General partnership; Scheduling (production processes); Operations research; Work (physics); Engineering; Computer science; Operations management; Industrial engineering; Business; Marketing; Finance; Mechanical engineering","score_opus":0.012021091295034194,"score_gpt":0.20301764813196013,"score_spread":0.19099655683692593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859875","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035522956,0.00025627032,0.9620068,0.000015912145,0.000782052,0.00086019107,0.00009889888,0.0003068109,0.00015012252],"genre_scores_gemma":[0.99787474,0.000008343785,0.001425232,0.00000907541,0.00016066643,0.00014167362,0.00016483515,0.0001495844,0.00006582744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984091,0.000011869543,0.00061143574,0.00042040378,0.00022800651,0.00031919894],"domain_scores_gemma":[0.9991367,0.00033931137,0.00008269374,0.0002943251,0.000087511435,0.00005949978],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016785706,0.00046766314,0.0005582495,0.0011612787,0.00004760342,0.000043485597,0.00009811139,0.0003790501,0.000014490991],"category_scores_gemma":[0.000046529385,0.00054987305,0.00015448,0.0004760173,0.000012850446,0.0000714729,0.000010807841,0.000615901,7.1571895e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009457117,0.0000059061367,0.0011906988,0.00013695596,0.00025622686,0.00021923726,0.00016823801,0.99440503,0.000013972554,0.0001929409,7.142492e-7,0.003400645],"study_design_scores_gemma":[0.00045309696,0.00002241233,0.000041810876,0.00013898814,0.00023091218,0.000027103675,0.000043420747,0.99781924,0.000032703872,0.00059579586,0.000114827395,0.00047969157],"about_ca_topic_score_codex":0.035414148,"about_ca_topic_score_gemma":0.95900184,"teacher_disagreement_score":0.9623518,"about_ca_system_score_codex":0.0007725576,"about_ca_system_score_gemma":0.00013754473,"threshold_uncertainty_score":0.9996953},"labels":[],"label_agreement":null},{"id":"W4385868267","doi":"10.59962/9780774850513-009","title":"The Culture of Construction: Or, Etiquette for the Nontraditional","year":2007,"lang":"en","type":"book-chapter","venue":"University of British Columbia Press eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Simon Fraser University","keywords":"Etiquette; History; Sociology; Philosophy; Linguistics","score_opus":0.015764340648727507,"score_gpt":0.17500422848657057,"score_spread":0.15923988783784307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385868267","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00007572575,0.0011585838,0.009549778,0.0000128444335,0.0008530348,0.00063694874,0.0015819393,0.000091730704,0.9860394],"genre_scores_gemma":[0.0037132928,0.0018433578,0.0023032487,0.00002113849,0.00025647905,0.000003207143,0.000053196884,0.00003531272,0.99177074],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99939305,0.000007228687,0.00018698479,0.00012472912,0.00018095768,0.00010707774],"domain_scores_gemma":[0.9992346,0.00014303286,0.00013729536,0.00016680466,0.00028675914,0.000031506686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008259038,0.00008931173,0.00017984702,0.000017619546,0.00026134978,0.000052350282,0.00023016511,0.00026369575,0.00016299053],"category_scores_gemma":[0.000004914824,0.00011665522,0.00017209946,0.0000069240787,0.0006461433,0.000040244344,0.000021200653,0.0002495539,5.4975925e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001336178,0.000007711404,0.000008653219,0.00027794132,0.00087696087,0.00002200404,0.0004904586,0.00010460352,0.000027599131,0.15288295,0.30089763,0.54426986],"study_design_scores_gemma":[0.00042515196,0.000040758252,0.00008742565,0.00024004138,0.00016525223,0.00014650771,0.0003520958,0.0002843547,0.000024800735,0.0045448993,0.99352723,0.00016150357],"about_ca_topic_score_codex":0.0026842162,"about_ca_topic_score_gemma":0.04451106,"teacher_disagreement_score":0.6926296,"about_ca_system_score_codex":0.000042644522,"about_ca_system_score_gemma":0.000053773532,"threshold_uncertainty_score":0.9729241},"labels":[],"label_agreement":null},{"id":"W4386268037","doi":"10.1007/978-3-031-32515-1_5","title":"Modeling Drywall Construction Process Using a Spatiotemporal Chronographical Scheduling","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Scheduling (production processes); Gantt chart; Computer science; Process (computing); Operations research; Partition (number theory); Engineering; Industrial engineering; Systems engineering; Operations management; Mathematics","score_opus":0.015922947689958968,"score_gpt":0.21907457338197722,"score_spread":0.20315162569201825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386268037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009302933,0.0010266759,0.9803233,0.000026741955,0.0024504855,0.00034531136,0.000028588369,0.0015761809,0.004919785],"genre_scores_gemma":[0.9857369,0.00021098343,0.012704907,0.000011900288,0.00083420257,0.0000313421,0.00008057565,0.00032764254,0.0000615322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981868,0.0000063708776,0.0006236072,0.00044671295,0.0003194727,0.00041701086],"domain_scores_gemma":[0.99940807,0.00006768229,0.00006894768,0.00026663308,0.00009540197,0.000093240764],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012921228,0.0005922519,0.0005085691,0.0009311523,0.000067253895,0.000084567175,0.00016554756,0.0009279222,0.00008208738],"category_scores_gemma":[0.00006426061,0.00068861083,0.00017982992,0.0003005608,0.000050676965,0.00019271033,0.00002905952,0.001472669,0.000031642696],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004949776,0.0000020241307,0.000055518376,0.00037642862,0.00006986145,0.0000119653605,0.00011873047,0.9891752,0.00041786395,0.002841383,9.5037046e-7,0.0069251247],"study_design_scores_gemma":[0.00020695663,0.000012123551,0.0000040647774,0.001163308,0.000049255177,0.000060878443,0.000007711119,0.98660904,0.00034706728,0.0107578,0.00013454248,0.00064722454],"about_ca_topic_score_codex":0.000021033748,"about_ca_topic_score_gemma":0.00052773155,"teacher_disagreement_score":0.976434,"about_ca_system_score_codex":0.00029612976,"about_ca_system_score_gemma":0.0000774244,"threshold_uncertainty_score":0.9995565},"labels":[],"label_agreement":null},{"id":"W4386432481","doi":"10.1007/978-981-19-9822-5_53","title":"Optimizing Prefabrication of Plumbing Systems for Residential Buildings from Remote High North Communities by Considering All Three Facets of Sustainable Development","year":2023,"lang":"en","type":"book-chapter","venue":"Environmental science and engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Prefabrication; Fuzzy logic; Sustainable development; Engineering; Computer science; Civil engineering; Architectural engineering","score_opus":0.011181160301071087,"score_gpt":0.17039944826572784,"score_spread":0.15921828796465676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386432481","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9080917,0.0025748897,0.08640488,0.0000099946665,0.0006333862,0.000804227,0.00016651467,0.00021439856,0.0010999714],"genre_scores_gemma":[0.99313235,0.00054213963,0.0049798805,0.0000017520964,0.000030350757,0.000019360128,0.000098455705,0.000048353235,0.0011473437],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989313,0.0000021151773,0.00036742748,0.00017725298,0.00030188388,0.0002200556],"domain_scores_gemma":[0.99960196,0.000050691193,0.00011567528,0.00015370066,0.000024358424,0.000053626783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001771556,0.000193274,0.0002487084,0.00018815002,0.00012987637,0.000052344512,0.00016446366,0.000098628916,0.0000075162666],"category_scores_gemma":[0.000007041186,0.00022573095,0.000031087104,0.000050425737,0.00019231507,0.00025595812,0.000101716054,0.0001367764,0.0000010682099],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026281721,0.000014439231,0.000290714,0.0017254268,0.00043804717,0.000004886081,0.008724322,0.711876,0.24347246,0.01612072,0.00027462203,0.017032096],"study_design_scores_gemma":[0.0016972108,0.00020483418,0.0054213325,0.0030848712,0.0003538154,0.000028443528,0.012830122,0.79577094,0.13768879,0.0017085503,0.038514152,0.0026969218],"about_ca_topic_score_codex":0.00044032454,"about_ca_topic_score_gemma":0.000045684636,"teacher_disagreement_score":0.10578368,"about_ca_system_score_codex":0.00025719375,"about_ca_system_score_gemma":0.000025846044,"threshold_uncertainty_score":0.9205041},"labels":[],"label_agreement":null},{"id":"W4386460268","doi":"10.1007/s41693-023-00112-8","title":"Improving autonomous robotic navigation using IFC files","year":2023,"lang":"en","type":"article","venue":"Construction Robotics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Tamkeen; York University; New York University Abu Dhabi","keywords":"Waypoint; Computer science; Semantic mapping; Process (computing); JSON; Simultaneous localization and mapping; Building information modeling; Robot; CityGML; Schedule; Artificial intelligence; Real-time computing; Human–computer interaction; Mobile robot; Database; Engineering; Visualization; Operating system","score_opus":0.015868713293266414,"score_gpt":0.22335580328053672,"score_spread":0.2074870899872703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386460268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23230262,0.00012840475,0.75541824,0.00008266683,0.007547201,0.00024730095,0.000015002407,0.0028838385,0.0013746982],"genre_scores_gemma":[0.93446577,0.000037365742,0.064655125,0.000017866947,0.0004339008,0.000015615251,0.00012870993,0.000062899315,0.00018275526],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905515,0.000021239015,0.0003245221,0.00018953391,0.00015255758,0.000256977],"domain_scores_gemma":[0.99953836,0.00003235278,0.000069896334,0.00019076563,0.00009553408,0.000073091804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008129954,0.000171846,0.0001591217,0.00023555938,0.00019095196,0.00009489809,0.00008309279,0.0001515653,0.000070734306],"category_scores_gemma":[0.000023628318,0.00019503769,0.000068844456,0.0006168316,0.00010895182,0.00029113668,0.000021324076,0.00020327905,0.00015596833],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014987819,0.0000026734374,0.00071547873,0.000054737975,0.000022426471,0.0000034650961,0.00005563901,0.9176368,0.01626715,0.008385768,0.00023653793,0.056617785],"study_design_scores_gemma":[0.00017195256,0.000010157839,0.00040045538,0.00004416426,0.00003901565,0.00020539008,0.0004314343,0.9924146,0.004523194,0.0011576907,0.00036711246,0.0002348299],"about_ca_topic_score_codex":0.000015946038,"about_ca_topic_score_gemma":0.0000044668236,"teacher_disagreement_score":0.70216316,"about_ca_system_score_codex":0.00015735881,"about_ca_system_score_gemma":0.000051431292,"threshold_uncertainty_score":0.7953406},"labels":[],"label_agreement":null},{"id":"W4386494210","doi":"10.32920/24101475","title":"Material Innovations: Transparent, lightweight, malleable &amp; responsive","year":2023,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Software portability; Architecture; Systems engineering; Computer science; Generator (circuit theory); Architectural engineering; Software engineering; Construction engineering; Manufacturing engineering; Engineering; Operating system","score_opus":0.055105415571436105,"score_gpt":0.2640754225889942,"score_spread":0.20897000701755808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386494210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33339033,0.00056103116,0.41987973,0.0036191635,0.05866704,0.002288145,0.0019469141,0.015968677,0.16367896],"genre_scores_gemma":[0.84811985,0.0016785229,0.033690766,0.00028596199,0.0034186558,0.0016932691,0.005765951,0.00049680995,0.104850195],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988652,0.000027264352,0.00044464073,0.00028619973,0.00017035383,0.00020633172],"domain_scores_gemma":[0.99934244,0.000030011763,0.00004890499,0.00038520165,0.00014958304,0.00004387461],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00010531946,0.00025963812,0.00024611122,0.00033974776,0.0000635921,0.00014365221,0.0001892833,0.00039567158,0.0019934385],"category_scores_gemma":[0.000017709974,0.00025027664,0.00008528977,0.00027579418,0.00003168791,0.000092758084,0.00006074892,0.00040483644,0.00080555433],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027201613,0.000076335775,0.000544519,0.0016728214,0.0011636799,0.000027057107,0.001700681,0.086433366,0.035620704,0.2194475,0.6356866,0.01735476],"study_design_scores_gemma":[0.0009014425,0.000048283677,0.003395367,0.0008062986,0.00019699021,0.000048061847,0.00043793116,0.015332526,0.058234837,0.09336937,0.824804,0.0024248722],"about_ca_topic_score_codex":0.00007430874,"about_ca_topic_score_gemma":0.0003143213,"teacher_disagreement_score":0.51472956,"about_ca_system_score_codex":0.0000959456,"about_ca_system_score_gemma":0.0000680547,"threshold_uncertainty_score":0.99999493},"labels":[],"label_agreement":null},{"id":"W4386523763","doi":"10.32920/24101475.v1","title":"Material Innovations: Transparent, lightweight, malleable &amp; responsive","year":2023,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Software portability; Architecture; Systems engineering; Computer science; Generator (circuit theory); Architectural engineering; Software engineering; Construction engineering; Engineering management; Engineering; Operating system","score_opus":0.055105415571436105,"score_gpt":0.2640754225889942,"score_spread":0.20897000701755808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386523763","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33339033,0.00056103116,0.41987973,0.0036191635,0.05866704,0.002288145,0.0019469141,0.015968677,0.16367896],"genre_scores_gemma":[0.84811985,0.0016785229,0.033690766,0.00028596199,0.0034186558,0.0016932691,0.005765951,0.00049680995,0.104850195],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988652,0.000027264352,0.00044464073,0.00028619973,0.00017035383,0.00020633172],"domain_scores_gemma":[0.99934244,0.000030011763,0.00004890499,0.00038520165,0.00014958304,0.00004387461],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00010531946,0.00025963812,0.00024611122,0.00033974776,0.0000635921,0.00014365221,0.0001892833,0.00039567158,0.0019934385],"category_scores_gemma":[0.000017709974,0.00025027664,0.00008528977,0.00027579418,0.00003168791,0.000092758084,0.00006074892,0.00040483644,0.00080555433],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027201613,0.000076335775,0.000544519,0.0016728214,0.0011636799,0.000027057107,0.001700681,0.086433366,0.035620704,0.2194475,0.6356866,0.01735476],"study_design_scores_gemma":[0.0009014425,0.000048283677,0.003395367,0.0008062986,0.00019699021,0.000048061847,0.00043793116,0.015332526,0.058234837,0.09336937,0.824804,0.0024248722],"about_ca_topic_score_codex":0.00007430874,"about_ca_topic_score_gemma":0.0003143213,"teacher_disagreement_score":0.51472956,"about_ca_system_score_codex":0.0000959456,"about_ca_system_score_gemma":0.0000680547,"threshold_uncertainty_score":0.99999493},"labels":[],"label_agreement":null},{"id":"W4386647162","doi":"10.4322/1809-7197.2023.111.0004","title":"Coretec Tools Concreto Armado : Uma plataforma online para auxílio no projeto de vigas de concreto armado conforme as prescrições da NBR 6118","year":2023,"lang":"pt","type":"article","venue":"CONCRETO & Construções","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ford Motor Company (Canada)","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.0416090316873835,"score_gpt":0.2900027133878326,"score_spread":0.24839368170044912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386647162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94678074,0.0024878595,0.0041934727,0.00091582845,0.0051338878,0.0030444174,0.005010713,0.0043459944,0.028087078],"genre_scores_gemma":[0.9818558,0.0025563193,0.0024927747,0.0014562497,0.0018385106,0.0005901908,0.0025779717,0.00040793643,0.0062242285],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99043626,0.00052538916,0.0028923366,0.0016136554,0.0012804101,0.003251978],"domain_scores_gemma":[0.99330485,0.0015364196,0.0009318844,0.0016350109,0.0011092396,0.0014826042],"candidate_categories":["metaepi_narrow","scholarly_communication","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"category_scores_codex":[0.0014254932,0.0020135627,0.002271599,0.00094978116,0.0008853618,0.0015014043,0.0015517169,0.0016917809,0.00406022],"category_scores_gemma":[0.0016396134,0.0021764485,0.0008643678,0.0017260357,0.0020601116,0.0020607226,0.00051857525,0.0025733681,0.0044126175],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0066639404,0.00023679747,0.058089744,0.0073903273,0.008698327,0.003897886,0.028557856,0.0065928176,0.16677952,0.13421632,0.29764032,0.2812361],"study_design_scores_gemma":[0.015220976,0.0023867053,0.0092266565,0.0051760958,0.0019037464,0.006700599,0.042101234,0.46669263,0.05893581,0.0016181642,0.38182366,0.008213719],"about_ca_topic_score_codex":0.0011475377,"about_ca_topic_score_gemma":0.00012677975,"teacher_disagreement_score":0.46009982,"about_ca_system_score_codex":0.0010892407,"about_ca_system_score_gemma":0.0029804045,"threshold_uncertainty_score":0.9997277},"labels":[],"label_agreement":null},{"id":"W4386698028","doi":"10.1139/cjce-2023-0184","title":"Measuring the value and cost of BIM use—an empirical lesson learned from Taiwan’s social housing projects","year":2023,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Process (computing); Analytic hierarchy process; Cost estimate; Empirical research; Process management; Prioritization; Computer science; Value engineering; Risk analysis (engineering); Business; Operations research; Operations management; Systems engineering; Engineering","score_opus":0.06180903546058785,"score_gpt":0.23859208763710504,"score_spread":0.17678305217651719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386698028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98789513,0.00034778353,0.010314758,0.00031259208,0.00080610294,0.000081900944,0.00001916038,0.00006565324,0.00015692771],"genre_scores_gemma":[0.9994413,0.000025408728,0.0001772892,0.000013884852,0.00029942475,0.0000024934388,0.0000029651678,0.00003188238,0.0000053539165],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992505,0.000025908574,0.00026927714,0.00007835329,0.00015379129,0.00022222732],"domain_scores_gemma":[0.99953216,0.000055112272,0.0000606141,0.00008068053,0.00008607382,0.000185336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023091784,0.000115748604,0.00018053652,0.00031281015,0.00010596504,0.00010072312,0.00011435166,0.000086974556,0.00001605061],"category_scores_gemma":[0.00009708141,0.000101852085,0.000057353893,0.00031436622,0.00004056244,0.000282967,0.000006731231,0.00031526433,0.0000011941661],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018856534,0.0000068735494,0.018332966,0.00014308866,0.00030243688,0.00009570195,0.011760154,0.9000969,0.018269807,0.0022463868,0.0018185497,0.046908285],"study_design_scores_gemma":[0.0013611899,0.00011963848,0.17977986,0.0007530381,0.00019478927,0.00024563077,0.004958385,0.78179646,0.0064391787,0.0010148782,0.02251315,0.00082378293],"about_ca_topic_score_codex":0.0010832225,"about_ca_topic_score_gemma":0.03883399,"teacher_disagreement_score":0.1614469,"about_ca_system_score_codex":0.00012805623,"about_ca_system_score_gemma":0.00019436823,"threshold_uncertainty_score":0.9787048},"labels":[],"label_agreement":null},{"id":"W4386698635","doi":"10.3389/fbuil.2023.1256921","title":"A graph-based explanatory model for room-based energy efficiency analysis based on BIM data","year":2023,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lassonde Industries (Canada); York University","funders":"Natural Sciences and Engineering Research Council of Canada; York University","keywords":"Interpretability; Building information modeling; Computer science; Energy consumption; Transparency (behavior); Graph; Data mining; Energy modeling; Building model; Model building; Machine learning; Engineering; Theoretical computer science; Simulation","score_opus":0.01789370039520526,"score_gpt":0.21021759885234637,"score_spread":0.1923238984571411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386698635","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006538435,0.00015396097,0.9919119,0.00012004074,0.00042898217,0.00017877984,0.00037067328,0.00019072663,0.00010651791],"genre_scores_gemma":[0.9678089,0.00004818476,0.029701931,0.00021768274,0.000032454518,0.0003153685,0.0017457983,0.00004356208,0.00008611802],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99866635,0.000031870026,0.00028576277,0.00042889646,0.00029187062,0.00029523027],"domain_scores_gemma":[0.99901044,0.000046693774,0.000044701315,0.0008179888,0.0000054249476,0.000074753625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021504734,0.00020907832,0.00024229001,0.00096875976,0.00006973581,0.000021008376,0.00034382037,0.000119559976,0.00003992399],"category_scores_gemma":[0.000011176726,0.00021763395,0.00013642544,0.0006505746,0.000051241397,0.000072732204,0.000019846359,0.00010594363,0.0000075407693],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034479195,0.000053075582,0.0032851554,0.000018185048,0.00006282827,0.0000018884724,0.000012834067,0.9807774,0.00009654183,0.000102891936,0.009024634,0.00653013],"study_design_scores_gemma":[0.00070733175,0.000033825094,0.00091271347,0.000013238149,0.000114043425,4.400633e-8,0.000042327185,0.99162817,0.00085927855,0.00028085802,0.0051771104,0.00023106801],"about_ca_topic_score_codex":0.000019952922,"about_ca_topic_score_gemma":0.0000381741,"teacher_disagreement_score":0.96220994,"about_ca_system_score_codex":0.00021692357,"about_ca_system_score_gemma":0.000035063043,"threshold_uncertainty_score":0.88748544},"labels":[],"label_agreement":null},{"id":"W4386746109","doi":"10.1201/9781003323020-220","title":"Integrating unstructured data analytics and BIM to support predictive maintenance","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Analytics; Computer science; Predictive analytics; Predictive maintenance; Data science; Engineering; Reliability engineering","score_opus":0.03128429033580181,"score_gpt":0.23406441892846272,"score_spread":0.20278012859266092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386746109","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00004486675,0.000058205074,0.09298032,0.00012180547,0.0016877577,0.0003707981,0.0012065067,0.0009800489,0.9025497],"genre_scores_gemma":[0.023351943,0.00068150176,0.013960428,0.00028204545,0.00082674855,0.000025990726,0.0018367122,0.00030183286,0.9587328],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988771,0.000003479169,0.0003422501,0.00040490742,0.0001848006,0.00018744642],"domain_scores_gemma":[0.99913013,0.00004353355,0.00005229655,0.0005593517,0.000098343,0.00011634869],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009353551,0.0003070064,0.00029203834,0.0002277153,0.000047684833,0.00007655001,0.00026788213,0.0002767557,0.00036461244],"category_scores_gemma":[0.000048384045,0.0002654294,0.000040682422,0.00007474194,0.00006405612,0.00014069011,0.00015719545,0.000404215,0.00011656445],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014896979,0.0000017056753,0.000032322143,0.00011412735,0.00035334541,0.000022270775,0.00020712662,0.0006627718,0.00007996215,0.7578042,0.09033469,0.15037255],"study_design_scores_gemma":[0.0006751772,0.00031210136,0.00035111318,0.0009647001,0.0004529696,0.00025053037,0.0011795232,0.24424545,0.0002407716,0.090579465,0.6587684,0.0019797962],"about_ca_topic_score_codex":0.000014376164,"about_ca_topic_score_gemma":0.00042742625,"teacher_disagreement_score":0.66722476,"about_ca_system_score_codex":0.00006977751,"about_ca_system_score_gemma":0.000043144963,"threshold_uncertainty_score":0.9999798},"labels":[],"label_agreement":null},{"id":"W4386755043","doi":"10.18280/rcma.330402","title":"Enhancing the Performance and Durability of Eco-Friendly Mortar with Diss Fibers (Ampelodesmos mauritanicus)","year":2023,"lang":"fr","type":"article","venue":"Revue des composites et des matériaux avancés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Durability; Mortar; Environmentally friendly; Composite material; Materials science; Ecology; Biology","score_opus":0.018053750897232095,"score_gpt":0.2312509141705765,"score_spread":0.2131971632733444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386755043","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96734613,0.0025316856,0.026918676,0.00053411105,0.0005683303,0.00038633644,0.00006884795,0.00020709442,0.0014387612],"genre_scores_gemma":[0.9644006,0.003227144,0.030981595,0.000017170847,0.000113990056,0.00004889296,0.000033137083,0.00006093816,0.0011165704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983597,0.00012447122,0.00054345647,0.00034702476,0.00019054406,0.00043484886],"domain_scores_gemma":[0.9987355,0.000384286,0.00014759642,0.00044262156,0.00017755176,0.000112480586],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004543921,0.00033160107,0.00040136965,0.000110445704,0.00030945704,0.00011245476,0.0002087014,0.00014068618,0.00010883817],"category_scores_gemma":[0.000047116013,0.00024743343,0.00009869354,0.000556189,0.0007430835,0.000520752,0.000072568175,0.00036438156,0.00006130455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041842108,0.00022150241,0.15229005,0.021870133,0.0010794944,0.000083998064,0.024076741,0.4846088,0.0920887,0.056831956,0.0008866278,0.16554357],"study_design_scores_gemma":[0.0013704341,0.0008778574,0.19765645,0.0058992724,0.0005515553,0.0014530717,0.0040525757,0.6821252,0.09147331,0.0052195257,0.007977786,0.0013429744],"about_ca_topic_score_codex":0.00016671787,"about_ca_topic_score_gemma":0.00076420646,"teacher_disagreement_score":0.19751637,"about_ca_system_score_codex":0.00014556083,"about_ca_system_score_gemma":0.000051785017,"threshold_uncertainty_score":0.9999978},"labels":[],"label_agreement":null},{"id":"W4387018542","doi":"10.46354/i3m.2023.mas.007","title":"Towards an advanced work packaging simulation-based approach for industrial construction projects","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Computer science; Manufacturing engineering; Systems engineering; Engineering; Mechanical engineering","score_opus":0.046026911238891514,"score_gpt":0.2653810932305068,"score_spread":0.21935418199161527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387018542","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11078534,0.0000066926264,0.8812574,0.000041928764,0.0010872089,0.0006024144,0.0000122572,0.0016880209,0.004518716],"genre_scores_gemma":[0.96608615,8.945405e-7,0.0331489,0.000017595026,0.00027257274,0.00016982271,0.00019523627,0.000025063999,0.00008374839],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935126,0.000015165368,0.00017901114,0.00016876346,0.00011137317,0.00017445064],"domain_scores_gemma":[0.9996661,0.0000639429,0.000025795684,0.00012501678,0.00007088057,0.00004824436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010492489,0.00011474458,0.00010525929,0.00016507204,0.000091158494,0.000054850974,0.000052706062,0.00012353607,0.000034102814],"category_scores_gemma":[0.000050830895,0.00011046071,0.000046252593,0.0005837548,0.000027333474,0.00022620907,0.0000039221363,0.00010432094,0.0000073349047],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027818236,0.0000050605213,0.0007055534,0.00001603754,0.000009427358,8.271752e-8,0.000056521247,0.7714275,0.00023672041,0.0016445795,0.00017081205,0.22569986],"study_design_scores_gemma":[0.0007688562,0.000029146377,0.00018941562,0.000011720385,0.000010044173,5.7348785e-7,0.0006375322,0.99324113,0.0032827498,0.00031741773,0.0013555518,0.00015588479],"about_ca_topic_score_codex":0.0000039778297,"about_ca_topic_score_gemma":0.0000025307777,"teacher_disagreement_score":0.85530084,"about_ca_system_score_codex":0.000052543848,"about_ca_system_score_gemma":0.00004866571,"threshold_uncertainty_score":0.45044568},"labels":[],"label_agreement":null},{"id":"W4387079747","doi":"10.1016/j.inffus.2023.102026","title":"Optimization-based probabilistic decision support for assessing building information modelling (BIM) maturity considering multiple objectives","year":2023,"lang":"en","type":"article","venue":"Information Fusion","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Computer science; Probabilistic logic; Context (archaeology); Building information modeling; Maturity (psychological); Decision support system; Life-cycle assessment; Operations research; Risk analysis (engineering); Systems engineering; Production (economics); Data mining; Operations management; Artificial intelligence; Engineering; Business","score_opus":0.0161128075763634,"score_gpt":0.23842056606240125,"score_spread":0.22230775848603784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387079747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04264568,0.000006949542,0.9534743,0.00003681655,0.00093546754,0.00064284814,0.00005129481,0.0011024844,0.0011041511],"genre_scores_gemma":[0.8477556,0.000018954483,0.15105848,0.00007541255,0.000054641263,0.00016266557,0.0008516992,0.000018195642,0.000004351332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998616,0.00001629674,0.0007058871,0.000105501684,0.0003002509,0.00025610314],"domain_scores_gemma":[0.9988803,0.00032393503,0.00016939951,0.00017025814,0.00038719946,0.00006886247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003792333,0.00019294396,0.00016581667,0.0005944331,0.00037457226,0.00043489313,0.000097023876,0.00017237774,0.000050939063],"category_scores_gemma":[0.00033145407,0.0001991948,0.00008288056,0.0005448387,0.00002879743,0.0049778926,0.000025839849,0.00015155956,0.00007017418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025917738,0.0000038443172,0.00010623783,0.00017721277,0.0000063332805,1.0254914e-7,0.00041220785,0.9595699,0.0001309645,0.0009296159,0.00030340877,0.038334265],"study_design_scores_gemma":[0.00072541484,0.000017781816,0.00018018263,0.00012334494,0.000012495865,0.0000046052114,0.0005162852,0.9907575,0.0014963285,0.0010730998,0.004866843,0.00022606335],"about_ca_topic_score_codex":0.00001083065,"about_ca_topic_score_gemma":0.0000033489307,"teacher_disagreement_score":0.8051099,"about_ca_system_score_codex":0.0001718718,"about_ca_system_score_gemma":0.00008872148,"threshold_uncertainty_score":0.81229275},"labels":[],"label_agreement":null},{"id":"W4387139999","doi":"10.18280/ijsse.130402","title":"Assessing and Mitigating Seismic Risk for a Hospital Structure in Zaruma, Ecuador: A Structural and Regulatory Evaluation","year":2023,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Escuela Superior Politécnica del Litoral","keywords":"Risk analysis (engineering); Structural integrity; Seismic risk; Environmental health; Forensic engineering; Environmental planning; Business; Civil engineering; Medicine; Engineering; Environmental science; Structural engineering","score_opus":0.005772578354498063,"score_gpt":0.2395193749131737,"score_spread":0.23374679655867564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387139999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9944142,0.0008519818,0.0035884469,0.00015569285,0.0008148095,0.00009759256,0.00003344203,0.000032794207,0.00001103177],"genre_scores_gemma":[0.99831265,0.00036469876,0.0010902807,0.000007395996,0.00019668031,0.0000025843851,0.000012382017,0.000012406307,9.2574044e-7],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992582,0.000016662212,0.00031885182,0.00009515379,0.00020565695,0.0001054733],"domain_scores_gemma":[0.99958384,0.00009802062,0.000095170675,0.000032740805,0.00014247204,0.000047781105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035485087,0.00010654057,0.00013957875,0.00024319948,0.000047403337,0.000109204164,0.000053966065,0.00007533828,0.000005193049],"category_scores_gemma":[0.00012106303,0.000106725136,0.000031474443,0.00008236465,0.000026004847,0.00046335542,0.00001914176,0.000238293,7.8720575e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001216862,0.000009843626,0.029138148,0.00030955693,0.00043639098,0.00003162069,0.007684659,0.45855498,0.0073938887,0.0027026264,0.000077142446,0.49353945],"study_design_scores_gemma":[0.0008259582,0.00002418074,0.10437093,0.0001663265,0.000023100052,0.00013689586,0.00064924,0.8897512,0.00037595752,0.003398659,0.00016117924,0.0001163888],"about_ca_topic_score_codex":0.000007127197,"about_ca_topic_score_gemma":0.000010780213,"teacher_disagreement_score":0.49342307,"about_ca_system_score_codex":0.00008168318,"about_ca_system_score_gemma":0.000016676902,"threshold_uncertainty_score":0.4352125},"labels":[],"label_agreement":null},{"id":"W4387165148","doi":"10.1007/978-3-031-35399-4","title":"Advances in Information Technology in Civil and Building Engineering","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Construction engineering; Architectural engineering; Engineering; Civil engineering; Computer science","score_opus":0.002811891208733483,"score_gpt":0.18329795868318274,"score_spread":0.18048606747444926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387165148","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005253004,0.026226649,0.9428568,0.00022602043,0.004189654,0.0011965632,0.00004829051,0.0034974478,0.01650561],"genre_scores_gemma":[0.9893257,0.005147523,0.004342376,0.000028493077,0.00033495162,0.00028620855,0.00009383144,0.00023984049,0.00020105962],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99848086,0.0000059953877,0.0006158649,0.00026822215,0.00017406313,0.0004549743],"domain_scores_gemma":[0.9994523,0.00021041528,0.00005881488,0.00020836026,0.00002569023,0.000044427008],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016755164,0.00045895626,0.00048924715,0.0030012075,0.00001671426,0.00005603703,0.00017514652,0.0008198729,0.0000132537325],"category_scores_gemma":[0.00027296395,0.0005444021,0.00004724515,0.0010068057,0.000025082052,0.00057951896,0.00005821912,0.0014652666,0.000009040279],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002604281,0.0000019842205,0.00023735882,0.0006767102,0.000009640238,0.000014743401,0.00021531373,0.952958,0.0004498912,0.0030815895,0.0000151675,0.042336978],"study_design_scores_gemma":[0.0007021794,0.000029332334,0.0005550207,0.0036367003,0.000014349134,0.00006198898,0.000020525616,0.95215005,0.0011196376,0.012498482,0.028131815,0.0010799365],"about_ca_topic_score_codex":0.000011108105,"about_ca_topic_score_gemma":0.0021319424,"teacher_disagreement_score":0.9840727,"about_ca_system_score_codex":0.00059232593,"about_ca_system_score_gemma":0.000045023444,"threshold_uncertainty_score":0.9997007},"labels":[],"label_agreement":null},{"id":"W4387308622","doi":"10.54878/s2wcrx08","title":"Implementation Of Electronic Tendering In Malaysian Construction Industry: A Case Study In The Preparation And Application Of E-Tendering","year":2023,"lang":"en","type":"article","venue":"International Journal of Automation and Digital Transformation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Procurement; Business; Productivity; E-procurement; Construction industry; Process (computing); Phase (matter); Industrial organization; Operations management; Process management; Marketing; Engineering; Computer science; Construction engineering; Economics; Economic growth","score_opus":0.008853369505192155,"score_gpt":0.28651658254894363,"score_spread":0.27766321304375147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387308622","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9864538,0.000022226262,0.012824458,0.000119884484,0.00008819894,0.00026917344,0.00000768142,0.000020995274,0.00019363847],"genre_scores_gemma":[0.99982893,0.00004873365,0.00006194056,0.000003436724,0.000019064606,0.000016015627,0.000016735643,0.0000046930877,4.4550018e-7],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894184,0.000029445278,0.0006605049,0.000058049693,0.00023804026,0.00007212777],"domain_scores_gemma":[0.9995897,0.000037300408,0.000202401,0.000040106665,0.00011555211,0.000014956885],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003504215,0.00007346697,0.00011231845,0.0005583124,0.000018736586,0.00006017765,0.00005822166,0.000057626035,0.0000027317565],"category_scores_gemma":[0.000010137449,0.00006484979,0.00002443726,0.00032794065,0.000028226965,0.0012740399,0.000005086948,0.00014432006,2.586302e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116950396,0.00012870498,0.14524782,0.00017407906,0.00013516573,0.000028240122,0.04448913,0.04353663,0.0038511283,0.013804483,0.0000061825394,0.7484815],"study_design_scores_gemma":[0.0039905217,0.0005033314,0.33640334,0.00015891093,0.000047044945,0.0038853018,0.21444064,0.43013477,0.0045371624,0.005577051,0.000083821666,0.00023809545],"about_ca_topic_score_codex":0.00006731207,"about_ca_topic_score_gemma":0.0002652894,"teacher_disagreement_score":0.7482434,"about_ca_system_score_codex":0.0000619093,"about_ca_system_score_gemma":0.000027690105,"threshold_uncertainty_score":0.26444978},"labels":[],"label_agreement":null},{"id":"W4387309213","doi":"10.56330/kltb8950","title":"Quay Quarter Tower, Sydney – conservation, life extension and upgrade using live digital twinning","year":2023,"lang":"en","type":"article","venue":"The Structural Engineer","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tower; Upgrade; Quarter (Canadian coin); Reuse; Intervention (counseling); Architectural engineering; Stiffness; Engineering; Civil engineering; Computer science; Structural engineering; Geography; Waste management","score_opus":0.014204379225474377,"score_gpt":0.2174068445445568,"score_spread":0.20320246531908243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387309213","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.994797,0.00030131443,0.0026761764,0.0005075047,0.0009097499,0.000111626614,0.000015276088,0.0005176909,0.00016364078],"genre_scores_gemma":[0.99919724,0.000019188214,0.0002984349,0.00010711319,0.00020437386,0.0000052284054,0.000026113272,0.000024287325,0.00011800821],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993429,0.000010194489,0.00018729831,0.00013531401,0.00013021637,0.00019408306],"domain_scores_gemma":[0.9996389,0.000059939834,0.000024175411,0.00015559545,0.000053525146,0.00006786752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000059705,0.00015710441,0.00012131761,0.000087041066,0.00012286083,0.000118527605,0.0000721114,0.000071041664,0.00005979405],"category_scores_gemma":[0.00005427814,0.0001119089,0.000040207615,0.00025658697,0.000056659475,0.0003160849,0.00002026894,0.00016999239,0.000026141613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001332678,0.0000126766745,0.017771382,0.000457361,0.00097166153,0.000050524843,0.024805134,0.6451121,0.11311668,0.040389877,0.066956885,0.09022247],"study_design_scores_gemma":[0.00027487666,0.000017771834,0.02601387,0.000045211782,0.000028618068,0.00010288787,0.0012555639,0.9677553,0.0004279792,0.0017206448,0.0020646339,0.0002926394],"about_ca_topic_score_codex":0.000023335955,"about_ca_topic_score_gemma":0.0000023658129,"teacher_disagreement_score":0.32264322,"about_ca_system_score_codex":0.000025283949,"about_ca_system_score_gemma":0.000012494715,"threshold_uncertainty_score":0.45635125},"labels":[],"label_agreement":null},{"id":"W4387380925","doi":"10.37256/dmt.3220232944","title":"Identification and Evaluation of the Key Decision Support Factors for Selecting Off-site Construction in Canada: A Building Information Modeling (BIM)-enabled Approach","year":2023,"lang":"en","type":"article","venue":"Digital Manufacturing Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure","funders":"Mitacs","keywords":"Prefabrication; Building information modeling; Identification (biology); Engineering; Factory (object-oriented programming); Quality (philosophy); Modular design; Productivity; Weighting; Function (biology); Key (lock); Computer science; Operations management; Civil engineering","score_opus":0.01289876203755141,"score_gpt":0.21097237809386898,"score_spread":0.19807361605631757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387380925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.943891,0.000016868717,0.0550552,0.000028212047,0.00029430157,0.00040257623,0.000024242958,0.00017812473,0.00010947922],"genre_scores_gemma":[0.9990002,0.000008566126,0.0008454665,0.0000019724507,0.000008409375,0.00006651435,0.00005631075,0.000010750121,0.0000017978584],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990438,0.000008972502,0.00041259325,0.0001358666,0.00022939629,0.00016934337],"domain_scores_gemma":[0.99955934,0.00005055222,0.000108644446,0.00014681599,0.00011836679,0.000016277107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002532184,0.00011209559,0.00013053334,0.00047493607,0.000087620945,0.00006181305,0.000099343124,0.0001180313,0.000001376016],"category_scores_gemma":[0.00019238901,0.000099440986,0.00002729232,0.00043084746,0.000030046796,0.0006629234,0.000038443053,0.00013937593,6.59732e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000119533015,0.0000038579615,0.012003629,0.00010241522,0.000023086048,6.04082e-8,0.00032258523,0.47178626,0.0019054582,0.0018216413,0.000019796284,0.51199925],"study_design_scores_gemma":[0.0003372456,0.000007112322,0.0078050154,0.00003700639,0.000016822849,0.000013652969,0.001824472,0.931966,0.048709393,0.009098366,0.000071412636,0.00011349023],"about_ca_topic_score_codex":0.0020847272,"about_ca_topic_score_gemma":0.00836344,"teacher_disagreement_score":0.51188576,"about_ca_system_score_codex":0.0003684012,"about_ca_system_score_gemma":0.00012577804,"threshold_uncertainty_score":0.46669957},"labels":[],"label_agreement":null},{"id":"W4387511328","doi":"10.1061/jcemd4.coeng-13019","title":"Detecting Information Bottlenecks in Architecture Engineering Construction Projects for Integrative Project Management","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Architecture; Engineering management; Systems engineering; Construction engineering; Engineering; Project management; Process management; Knowledge management; Computer science; Software engineering; Geography","score_opus":0.005720759321602127,"score_gpt":0.19959399173186743,"score_spread":0.1938732324102653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387511328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21049438,0.00025503454,0.78190523,0.000098432254,0.0039409385,0.0012555998,0.000014292764,0.0005875453,0.0014485556],"genre_scores_gemma":[0.7338575,0.0023305255,0.2626617,0.000024467536,0.00039593867,0.00052727666,0.000028008311,0.00007701564,0.00009759236],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988624,0.000011301829,0.00057601504,0.000117560914,0.00018927085,0.00024349497],"domain_scores_gemma":[0.9995917,0.000044345325,0.00013577852,0.00009068363,0.0000889669,0.000048525297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030214238,0.00021367415,0.00023752937,0.0016700262,0.000052153155,0.00008706914,0.00008101783,0.00008619232,0.0000025519319],"category_scores_gemma":[0.00003201662,0.00020285978,0.00008293957,0.00072254986,0.000026431531,0.00052353076,0.000024056817,0.00026042375,0.0000015833468],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063903986,0.000008642228,0.00021991004,0.0016319694,0.00033492234,0.000016364467,0.0009440067,0.44926327,0.00057982554,0.019657573,0.00057746045,0.52670217],"study_design_scores_gemma":[0.0057782815,0.00038189627,0.0053533423,0.0025699362,0.00032953467,0.0019126866,0.018168144,0.8201232,0.004958101,0.0021724903,0.13697147,0.0012808995],"about_ca_topic_score_codex":0.0000018669873,"about_ca_topic_score_gemma":0.0000019823447,"teacher_disagreement_score":0.52542126,"about_ca_system_score_codex":0.00014007381,"about_ca_system_score_gemma":0.000013197252,"threshold_uncertainty_score":0.8272382},"labels":[],"label_agreement":null},{"id":"W4387541926","doi":"10.5614/jts.2023.30.2.7","title":"Evaluasi Nilai Faktor Performa Struktur Modular Komposit dengan Dinding Internal Pelat Baja Bergelombang","year":2023,"lang":"id","type":"article","venue":"Jurnal Teknik Sipil","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute for Clinical Evaluative Sciences","funders":"","keywords":"Modular design; Structural engineering; Humanities; Mathematics; Engineering; Computer science; Operating system; Art","score_opus":0.013583091681956127,"score_gpt":0.23717522367143723,"score_spread":0.2235921319894811,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387541926","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97999525,0.0011052284,0.0018196988,0.0003932339,0.008334592,0.00032300173,0.00007615182,0.0007068013,0.007246054],"genre_scores_gemma":[0.9855477,0.00066051085,0.00029924323,0.00007281042,0.0023273104,0.00003419211,0.00007048806,0.00015442006,0.010833312],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99633443,0.00014559508,0.0009891569,0.0005949744,0.00095687294,0.0009789844],"domain_scores_gemma":[0.9985109,0.00011380961,0.0002497668,0.0004752889,0.0002371322,0.00041312986],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00063923944,0.0006588766,0.00056397734,0.0006881617,0.0006385254,0.0005116988,0.00054842513,0.0004903506,0.0008489841],"category_scores_gemma":[0.000098058415,0.0006725556,0.0004985907,0.0009470993,0.0001113277,0.000921599,0.00018338129,0.001622586,0.0019803992],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005458126,0.0002983609,0.05391742,0.0015675412,0.0030705698,0.00061534083,0.011105744,0.031695973,0.47810894,0.017499236,0.04002778,0.36154726],"study_design_scores_gemma":[0.005003356,0.000920417,0.1634814,0.0027268687,0.0011970006,0.0014648319,0.0064382604,0.56045693,0.1286606,0.0021056314,0.12374998,0.003794699],"about_ca_topic_score_codex":0.000055253877,"about_ca_topic_score_gemma":0.000045192017,"teacher_disagreement_score":0.52876097,"about_ca_system_score_codex":0.0006421614,"about_ca_system_score_gemma":0.00014461637,"threshold_uncertainty_score":0.9995726},"labels":[],"label_agreement":null},{"id":"W4387583965","doi":"10.1088/1755-1315/1237/1/011001","title":"Preface","year":2023,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Library science; Governor; Sustainability; Management; Computer science; Ecology","score_opus":0.009352343361379543,"score_gpt":0.18113925008792262,"score_spread":0.17178690672654306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387583965","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9904102,0.00004479244,0.00009510703,0.000059144142,0.00020434715,0.00004387215,0.0000097844295,0.0001655906,0.008967127],"genre_scores_gemma":[0.998496,0.00042140868,0.00013602785,0.0000135222335,0.000016446846,0.000006165638,0.000005393407,0.0000035055984,0.0009015424],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995029,0.0000031797035,0.0000630748,0.00012797044,0.00013173535,0.0001711314],"domain_scores_gemma":[0.99982834,0.0000037574412,0.0000072204944,0.00007996744,0.0000027809192,0.00007794248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000056839854,0.00006529896,0.000045490055,0.000047020712,0.00014577415,0.00006963291,0.00007701095,0.000021945203,0.00021144553],"category_scores_gemma":[0.0000032751843,0.00005997924,0.000008431493,0.00017593436,0.00049370236,0.00043839868,0.000032623688,0.00005100227,0.0001499568],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000048765414,0.000003929491,0.001632798,0.0000111906575,0.000003599355,0.000002698036,0.00064569234,0.0006513,0.8003742,0.007540096,0.00011842914,0.18901116],"study_design_scores_gemma":[0.00020558227,0.000098760764,0.34132385,0.000020162806,0.0000053533176,0.00006690787,0.0035342881,0.027179485,0.58662295,0.0010729035,0.039478987,0.00039076374],"about_ca_topic_score_codex":0.0000042984298,"about_ca_topic_score_gemma":0.00001254864,"teacher_disagreement_score":0.33969104,"about_ca_system_score_codex":0.00001005899,"about_ca_system_score_gemma":0.000010612369,"threshold_uncertainty_score":0.24458826},"labels":[],"label_agreement":null},{"id":"W4387682529","doi":"10.1090/gsm/237/03","title":"Variational principles and applications","year":2023,"lang":"en","type":"book-chapter","venue":"Graduate studies in mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Computer science","score_opus":0.12764960333355446,"score_gpt":0.2861148112500686,"score_spread":0.15846520791651414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387682529","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006241712,0.0024355613,0.01184756,0.0001376158,0.00093823904,0.00077087857,0.000107224434,0.00068522117,0.9830153],"genre_scores_gemma":[0.003984344,0.045608133,0.03924828,0.00004238793,0.001262009,0.0012821242,0.000175753,0.0003962499,0.9080007],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99927557,0.0000027950462,0.00033896754,0.00013398106,0.00015259966,0.000096071795],"domain_scores_gemma":[0.99954593,0.0001484915,0.00006523587,0.00014930456,0.0000716124,0.000019426378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011560233,0.00018489949,0.0002566871,0.00014368167,0.00005600572,0.000016084547,0.000061498744,0.00010760774,0.00001268042],"category_scores_gemma":[0.00002642042,0.00017680333,0.000035659723,0.00004559127,0.00011653344,0.00003025442,0.000048645827,0.00020362234,0.00009748526],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.5545467e-7,0.0000027675728,0.0000037073862,0.00046793782,0.0001288758,0.0000013597796,0.0005885469,0.00033273906,0.0000011624464,0.9930432,0.0008796859,0.004549776],"study_design_scores_gemma":[0.00008844297,0.000005491656,0.00004106789,0.0003056666,0.000054408665,0.000014185504,0.00042243884,0.0069831265,0.0000033039228,0.95850974,0.033336107,0.00023601484],"about_ca_topic_score_codex":2.8959852e-7,"about_ca_topic_score_gemma":0.000020034171,"teacher_disagreement_score":0.07501456,"about_ca_system_score_codex":0.00006266549,"about_ca_system_score_gemma":0.000009670763,"threshold_uncertainty_score":0.720983},"labels":[],"label_agreement":null},{"id":"W4387717795","doi":"10.5267/j.msl.2023.10.099","title":"Building information modelling (BIM) and knowledge management in implementation for con-struction projects","year":2023,"lang":"en","type":"article","venue":"Management Science Letters","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Variety (cybernetics); Deliverable; Viewpoints; Computer science; Process management; Facility management; Construction management; Risk analysis (engineering); Knowledge management; Quality (philosophy); Construction engineering; Engineering management; Systems engineering; Business; Engineering; Operations management","score_opus":0.018150292422762546,"score_gpt":0.26389844127325446,"score_spread":0.2457481488504919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387717795","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55663097,0.000008105451,0.43908966,0.00029400855,0.00066828093,0.0008717278,0.0000027576698,0.00025371034,0.002180794],"genre_scores_gemma":[0.98197854,0.00006043306,0.017486015,0.000119380355,0.00002781149,0.00028762495,0.000018231762,0.000007615612,0.000014324108],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992148,0.0000060800435,0.00020735034,0.00016327281,0.00016244643,0.00024602862],"domain_scores_gemma":[0.99983466,0.000008368742,0.000031017793,0.000087407316,0.000013518762,0.00002501565],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039339578,0.00009035098,0.000059933613,0.00089834287,0.00014855563,0.000157283,0.00009841181,0.000016999296,0.0000024706164],"category_scores_gemma":[0.0000013227487,0.00009838032,0.000015699745,0.0009858098,0.000055688997,0.0011473228,0.00004280219,0.000043390286,0.000011032755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008994633,0.000004695492,0.0010745485,0.0004816251,0.000028091908,0.0000014135438,0.0013343388,0.23542157,0.002626713,0.16037476,0.0015274129,0.5971158],"study_design_scores_gemma":[0.00085004483,0.000014115131,0.007437616,0.000053407544,0.000020000474,0.0000019908036,0.0059256977,0.97311014,0.0017781835,0.002535182,0.008043614,0.00022998707],"about_ca_topic_score_codex":0.000008248775,"about_ca_topic_score_gemma":0.0000076052975,"teacher_disagreement_score":0.7376886,"about_ca_system_score_codex":0.00014300265,"about_ca_system_score_gemma":0.0000026632956,"threshold_uncertainty_score":0.4011833},"labels":[],"label_agreement":null},{"id":"W4387734407","doi":"10.20944/preprints202310.1151.v1","title":"Data- and Knowledge-Driven Cycle Time Estimation in Offsite Construction","year":2023,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Workstation; Computer science; Estimation; Factory (object-oriented programming); Simulation; Real-time computing; Industrial engineering; Machine learning; Engineering; Operating system; Systems engineering","score_opus":0.07656687188327758,"score_gpt":0.31705645109312236,"score_spread":0.24048957920984476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387734407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9846776,0.00017305088,0.005332844,0.000110879286,0.0017511107,0.00047275933,0.00018375779,0.0010234086,0.0062745484],"genre_scores_gemma":[0.9960064,0.000248578,0.0024457558,0.0000050361186,0.00012841595,0.00008940252,0.00060196023,0.00005479932,0.00041964074],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985223,0.00006511893,0.00045915338,0.0006225468,0.00013635698,0.0001945715],"domain_scores_gemma":[0.9988502,0.000051994506,0.00009619028,0.00087231223,0.000061059174,0.00006822866],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00031401688,0.00025574616,0.00029857786,0.00031186506,0.000049832484,0.000041346448,0.00032123126,0.00034630822,0.00023139974],"category_scores_gemma":[0.00008842964,0.00030258493,0.000041983938,0.00019572834,0.00009554626,0.00025202864,0.00083019654,0.000651904,0.0021393928],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004762818,0.00009407084,0.5139204,0.0013581561,0.00040535937,0.000015753618,0.002638443,0.33043903,0.010289939,0.0023836042,0.0010234503,0.13738412],"study_design_scores_gemma":[0.000261463,0.0000035959633,0.1512718,0.0002871917,0.000045001423,0.000022642305,0.00008146131,0.84051406,0.0014357727,0.0037406338,0.0019881318,0.00034823813],"about_ca_topic_score_codex":0.00007551432,"about_ca_topic_score_gemma":0.00016136908,"teacher_disagreement_score":0.51007503,"about_ca_system_score_codex":0.00014076226,"about_ca_system_score_gemma":0.00006791621,"threshold_uncertainty_score":0.9999426},"labels":[],"label_agreement":null},{"id":"W4387738139","doi":"10.3390/su152014991","title":"Construction Simulation and Environmental Impact Analysis: Towards a 4D-Based Analysis of Road Project Variants","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Schedule; Computer science; Work (physics); Impact assessment; Project planning; Environmental impact assessment; Software deployment; Project management; Scale (ratio); Environmental resource management; Risk analysis (engineering); Systems engineering; Engineering; Environmental science; Geography; Business; Software engineering","score_opus":0.008490591080027664,"score_gpt":0.275720345974769,"score_spread":0.2672297548947414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387738139","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96855456,0.00002637697,0.030826155,0.000016881484,0.00004688156,0.00022290327,0.00011165551,0.00015217537,0.000042396594],"genre_scores_gemma":[0.999569,0.0000044461817,0.00016302319,0.0000018622018,0.000011091128,0.00002064805,0.00021494686,0.000006854858,0.000008125791],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991388,0.000068846,0.00027819755,0.00020136492,0.00016037506,0.00015242073],"domain_scores_gemma":[0.9995373,0.000049350703,0.000059466533,0.00022214929,0.00009298269,0.00003875746],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025826498,0.00012070558,0.00027279474,0.00091921154,0.00006404512,0.000030673105,0.00003982812,0.00008693452,0.00008675036],"category_scores_gemma":[0.000099298726,0.000112376314,0.0002248446,0.0027865258,0.00014034167,0.00014202115,0.000012173573,0.000074294854,5.449422e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024618525,0.000014204901,0.21847704,0.00004341058,0.0011130284,6.518757e-7,0.0002708218,0.74945587,0.00010986355,0.00009261417,0.0000025076806,0.030395353],"study_design_scores_gemma":[0.00009469199,0.00001644278,0.4507244,8.875622e-7,0.0008101387,2.2134608e-7,0.0007414312,0.5472549,0.00008480119,0.00020925933,0.000006215186,0.000056614794],"about_ca_topic_score_codex":0.00043642623,"about_ca_topic_score_gemma":0.00006374607,"teacher_disagreement_score":0.23224735,"about_ca_system_score_codex":0.00041931364,"about_ca_system_score_gemma":0.000112406226,"threshold_uncertainty_score":0.45825732},"labels":[],"label_agreement":null},{"id":"W4387775752","doi":"10.3390/su152015049","title":"Potential Integration of Bridge Information Modeling and Life Cycle Assessment/Life Cycle Costing Tools for Infrastructure Projects within Construction 4.0: A Review","year":2023,"lang":"en","type":"review","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Government of Canada; University of Ottawa","funders":"National Research Council Canada","keywords":"Building information modeling; Bridge (graph theory); Life-cycle assessment; Engineering; Asset (computer security); Sustainability; Construction engineering; Key (lock); Systems engineering; Component (thermodynamics); Computer science; Risk analysis (engineering); Business; Operations management; Production (economics)","score_opus":0.026981108302123608,"score_gpt":0.31388506360274737,"score_spread":0.28690395530062374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387775752","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023667426,0.6429882,0.34383622,0.000083401654,0.0013002385,0.008178083,0.0004274592,0.00066509,0.00015455145],"genre_scores_gemma":[0.019352451,0.9737372,0.0045230454,0.000033252527,0.00019936336,0.0009962416,0.0010845681,0.00006958702,0.0000042964016],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99727404,0.00015892566,0.0016688671,0.0003300996,0.00028290215,0.00028519225],"domain_scores_gemma":[0.9975971,0.00015664381,0.00061667874,0.00034209897,0.0011667997,0.0001207026],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009253599,0.00043476044,0.0012401195,0.00029542836,0.00016092886,0.00018717212,0.00014700557,0.00041171935,0.000010744322],"category_scores_gemma":[0.0027915824,0.0003948637,0.0002955711,0.0005979528,0.00011146179,0.0013931696,0.00005893006,0.0005591144,0.0000013445291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000782809,0.000005382086,0.0000060725947,0.12819137,0.00008721388,2.1258523e-7,0.0001416664,0.018112691,3.938938e-7,0.0024458272,0.00007173942,0.8509296],"study_design_scores_gemma":[0.00067235605,0.00010926511,0.0001693643,0.02386077,0.0014359102,0.00006610266,0.0026850714,0.94155985,0.0000025500822,0.0101765245,0.018305844,0.00095639226],"about_ca_topic_score_codex":0.00005673904,"about_ca_topic_score_gemma":0.000010816938,"teacher_disagreement_score":0.92344713,"about_ca_system_score_codex":0.00074233534,"about_ca_system_score_gemma":0.0014605869,"threshold_uncertainty_score":0.99985033},"labels":[],"label_agreement":null},{"id":"W4388107915","doi":"10.18280/ijsdp.181005","title":"Impact of Construction Systems on Project Timelines: A Case Study of Multi-Floor Affordable Residential Buildings","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Timeline; Architectural engineering; Affordable housing; Civil engineering; Engineering; Construction engineering; Environmental planning; Environmental science; Geography","score_opus":0.022155660841764208,"score_gpt":0.29723349099295104,"score_spread":0.2750778301511868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388107915","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99720657,0.00012524707,0.0017627655,0.0000033354527,0.0006310862,0.0001643153,0.0000038894095,0.000025064319,0.000077741606],"genre_scores_gemma":[0.99870646,0.000017908564,0.0010202539,7.416668e-7,0.000102469916,0.0000065806407,0.000005124644,0.00000985838,0.00013061425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.99893296,0.00002263432,0.0005559542,0.000073683936,0.00029179623,0.00012298931],"domain_scores_gemma":[0.99888533,0.000045315584,0.00026611777,0.00003865735,0.0007332606,0.00003133054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033203283,0.00010483547,0.00018930827,0.0008862893,0.000055669992,0.000054674845,0.00008794103,0.000046197245,0.000007144394],"category_scores_gemma":[0.000058390808,0.00008799893,0.000044316334,0.0002661118,0.000020597154,0.00025827074,0.00002206204,0.00012244622,6.414281e-7],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015080464,0.00050438516,0.16970997,0.0007936517,0.0042295777,0.017936246,0.08188984,0.6720009,0.0036733258,0.0012499554,0.0036679278,0.042836197],"study_design_scores_gemma":[0.0062459526,0.0011539179,0.031225516,0.0011942004,0.00011610514,0.0106223505,0.8886879,0.05461706,0.0045162784,0.000089904075,0.0010347058,0.000496119],"about_ca_topic_score_codex":0.00040861501,"about_ca_topic_score_gemma":0.000005182708,"teacher_disagreement_score":0.80679804,"about_ca_system_score_codex":0.00013537519,"about_ca_system_score_gemma":0.00016394765,"threshold_uncertainty_score":0.35884923},"labels":[],"label_agreement":null},{"id":"W4388177368","doi":"10.1016/j.autcon.2023.105155","title":"Automated system for high-accuracy quantity takeoff using BIM","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Takeoff; Building information modeling; Dashboard; Reliability (semiconductor); Computer science; Procurement; Reliability engineering; Track (disk drive); Quality (philosophy); Systems engineering; Engineering; Database; Automotive engineering; Power (physics)","score_opus":0.02178659303656006,"score_gpt":0.26267407209469285,"score_spread":0.2408874790581328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388177368","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8965203,0.00002112574,0.09139024,0.000035766698,0.004256622,0.00042724324,0.000039507016,0.007065494,0.00024366731],"genre_scores_gemma":[0.98797756,0.000011171531,0.011597983,0.0000047240196,0.00013624919,0.000115281284,0.00011952117,0.000029841198,0.0000076897795],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988892,0.000041776195,0.00048958225,0.00019720594,0.00015382448,0.00022839993],"domain_scores_gemma":[0.9994689,0.000101541926,0.00011112461,0.00016542066,0.00011530472,0.000037691017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023008119,0.00015435374,0.00018683019,0.00053546246,0.00014744379,0.00008409903,0.00007194771,0.00017042198,0.00002397561],"category_scores_gemma":[0.000073774405,0.00017450647,0.000052106654,0.001016951,0.000050271425,0.00053376576,0.000009332684,0.00010150862,0.00007492255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049707523,0.000025029727,0.012355883,0.0013779057,0.00013775658,0.0000069713333,0.00046438596,0.33766595,0.07104994,0.4140901,0.0023401002,0.16043626],"study_design_scores_gemma":[0.00052839983,0.0000116203555,0.010509168,0.000108966015,0.000016866536,0.000064041466,0.0006734924,0.97856534,0.007932321,0.0011526492,0.00024892783,0.0001881855],"about_ca_topic_score_codex":0.000107905216,"about_ca_topic_score_gemma":0.000043727967,"teacher_disagreement_score":0.6408994,"about_ca_system_score_codex":0.00030992553,"about_ca_system_score_gemma":0.00004695933,"threshold_uncertainty_score":0.71161675},"labels":[],"label_agreement":null},{"id":"W4388198700","doi":"10.48209/978-65-5417-162-5","title":"EL MÉTODO DEL DISEÑO DE MEZCLAS Y SU IMPACTO EN LAS PROPIEDADES DEL CONCRETO","year":2023,"lang":"es","type":"book","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.012808357743145845,"score_gpt":0.24656304474715468,"score_spread":0.23375468700400884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388198700","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02799587,0.0021144627,0.07912038,0.000897621,0.00510347,0.0018737416,0.0008459029,0.004362006,0.87768656],"genre_scores_gemma":[0.21185166,0.0025873515,0.0045187743,0.00028776785,0.0033253764,0.00032705732,0.00078798586,0.00063211366,0.7756819],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973978,0.00010363895,0.00074236665,0.00057468296,0.00044209865,0.0007394309],"domain_scores_gemma":[0.99839187,0.00038681328,0.000158448,0.0005198025,0.00019808875,0.00034497917],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00031168052,0.000785981,0.00069161603,0.00040499715,0.0002078877,0.00037757002,0.00040369845,0.0011671447,0.0017154336],"category_scores_gemma":[0.00017774188,0.0007113605,0.00038996505,0.00027117945,0.00017238177,0.00031118398,0.00009865238,0.0012168619,0.0018939993],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009925102,0.000028553848,0.0033593539,0.0013986647,0.001302132,0.00006814324,0.0010687802,0.002191319,0.004062287,0.8393868,0.107453756,0.03958096],"study_design_scores_gemma":[0.0030573616,0.0006651527,0.015859447,0.0042875833,0.0021772662,0.0007292322,0.0039418167,0.1322963,0.015634758,0.06545865,0.7487495,0.0071429443],"about_ca_topic_score_codex":0.00061901595,"about_ca_topic_score_gemma":0.00021130718,"teacher_disagreement_score":0.77392817,"about_ca_system_score_codex":0.0008493936,"about_ca_system_score_gemma":0.00074274687,"threshold_uncertainty_score":0.9995338},"labels":[],"label_agreement":null},{"id":"W4388213156","doi":"10.1007/978-3-031-39663-2","title":"Proceedings of SECON’23","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Engineering; Computer science","score_opus":0.00578306178442387,"score_gpt":0.181262018049728,"score_spread":0.17547895626530413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388213156","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0060425415,0.008633352,0.18955714,0.00015948415,0.013872956,0.0017285963,0.00025464487,0.0075107804,0.7722405],"genre_scores_gemma":[0.9131708,0.0010704533,0.0047120596,0.00006175227,0.003253701,0.0002884775,0.0003128887,0.0012573875,0.07587247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896276,0.0000011464417,0.00038681866,0.00021674747,0.00017969495,0.00025282902],"domain_scores_gemma":[0.99961305,0.00011000474,0.000055176148,0.000117487245,0.00006213428,0.00004217163],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008125558,0.00033322404,0.00040025427,0.0005169102,0.0000114121385,0.000025231926,0.00016071749,0.00053816923,0.00008891982],"category_scores_gemma":[0.000076189455,0.0003652089,0.00011019408,0.00029936145,0.000021276053,0.00008184159,0.000024183231,0.0007554238,0.000035271707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000847097,0.000009796122,0.00017554565,0.00466301,0.00026319746,0.000014233674,0.0007738359,0.9335701,0.011526607,0.011664033,0.008896288,0.028434899],"study_design_scores_gemma":[0.0015828753,0.00018783954,0.0010159881,0.009745396,0.0002674908,0.00017064657,0.000034441386,0.68597203,0.05499723,0.06181285,0.17978492,0.0044283033],"about_ca_topic_score_codex":0.000002621562,"about_ca_topic_score_gemma":0.00015388965,"teacher_disagreement_score":0.9071283,"about_ca_system_score_codex":0.00022501257,"about_ca_system_score_gemma":0.000039491406,"threshold_uncertainty_score":0.99988},"labels":[],"label_agreement":null},{"id":"W4388541810","doi":"10.51483/ijaiml.3.2.2023.57-73","title":"Revolutionizing Construction: The Impact of Artificial Intelligence on Productivity","year":2023,"lang":"en","type":"article","venue":"International Journal of Artificial Intelligence and Machine Learning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Computer science; Engineering; Artificial intelligence; Economics; Economic growth","score_opus":0.04299398507410898,"score_gpt":0.3056058142472521,"score_spread":0.2626118291731431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388541810","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8106774,0.00037386597,0.18395407,0.0012160096,0.0028749334,0.00013197662,0.000014344462,0.000110371555,0.00064703444],"genre_scores_gemma":[0.99839836,0.00040057782,0.00047411586,0.000008773323,0.0006734084,0.0000027196827,0.000005147871,0.000013599477,0.000023295348],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986157,0.00007784559,0.0006601225,0.00012858145,0.00036587508,0.00015190023],"domain_scores_gemma":[0.9989526,0.00018835756,0.00027584154,0.000094015246,0.00043752315,0.000051646875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006273092,0.00014340467,0.00018637661,0.00037002572,0.00014293147,0.00009214268,0.00023412121,0.00006233665,0.000105992935],"category_scores_gemma":[0.00035983196,0.00010319797,0.00016112189,0.00041979947,0.00020477454,0.00027183426,0.000034172645,0.0005606011,0.000027875229],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011671353,0.000025837011,0.0014449432,0.000007480454,0.0001380784,0.000007959289,0.00061088597,0.30942416,0.004931428,0.03069591,0.000052466952,0.65254414],"study_design_scores_gemma":[0.00006865584,0.00083147595,0.004608204,0.00033491652,0.00006495523,0.0008312127,0.005122428,0.7856391,0.088916145,0.11195848,0.001201381,0.0004230239],"about_ca_topic_score_codex":0.00007856579,"about_ca_topic_score_gemma":0.000025836564,"teacher_disagreement_score":0.6521211,"about_ca_system_score_codex":0.000084346415,"about_ca_system_score_gemma":0.000054926753,"threshold_uncertainty_score":0.4208291},"labels":[],"label_agreement":null},{"id":"W4388738020","doi":"10.1080/24751448.2023.2245712","title":"Automatic Generation of Architectural Plans with Machine Learning","year":2023,"lang":"en","type":"article","venue":"Technology|Architecture + Design","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Federation on Ageing","funders":"","keywords":"Computer science; Software engineering; Architectural engineering; Artificial intelligence; Engineering drawing; Systems engineering; Engineering","score_opus":0.014545803977257212,"score_gpt":0.19932557797806905,"score_spread":0.18477977400081183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388738020","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5803681,0.00016072713,0.41475773,0.0003274597,0.000134866,0.0002751423,0.00001098316,0.003675004,0.00028994452],"genre_scores_gemma":[0.97922,0.00001417046,0.020476425,0.000009747911,0.000050418646,0.000066116736,0.000041359806,0.000039814462,0.00008196354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991174,0.000047822617,0.00023538982,0.00018476395,0.00016212878,0.00025253394],"domain_scores_gemma":[0.9995897,0.000060535953,0.00005721133,0.00022285784,0.000037421265,0.000032275144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013399601,0.0001963948,0.0002143792,0.0007755336,0.00009457227,0.000015787875,0.00016735317,0.00019149976,0.000056953337],"category_scores_gemma":[0.000040872877,0.00015290182,0.000038641083,0.0010939463,0.00014529447,0.00003975923,0.000018743818,0.00051088707,0.000034342145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018968378,0.0000075751227,0.00090655417,0.00007236048,0.00008965851,0.000011680933,0.00046086454,0.43672,0.15369321,0.0016133442,0.00023748683,0.40616828],"study_design_scores_gemma":[0.00046474155,0.00032242405,0.00057718187,0.000071287075,0.000038347673,0.00033770088,0.00012879318,0.82012844,0.17324279,0.0036884018,0.00069982343,0.0003000522],"about_ca_topic_score_codex":0.0000064474593,"about_ca_topic_score_gemma":0.00005631946,"teacher_disagreement_score":0.40586823,"about_ca_system_score_codex":0.000028459823,"about_ca_system_score_gemma":0.000022529503,"threshold_uncertainty_score":0.62351555},"labels":[],"label_agreement":null},{"id":"W4388859628","doi":"10.3390/app132312563","title":"Exploring BIM Implementation Challenges in Complex Renovation Projects: A Case Study of UBC’s BRDF Expansion","year":2023,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Building information modeling; Process management; Workflow; Procurement; Knowledge management; Key (lock); Engineering management; Project management; CLARITY; Engineering; Business; Computer science; Systems engineering; Operations management","score_opus":0.3557410557898048,"score_gpt":0.3422381483836603,"score_spread":0.013502907406144515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388859628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981345,0.00002289028,0.0001096514,0.00003098112,0.00013484147,0.00033419204,0.0000010919241,0.00014969682,0.0010821839],"genre_scores_gemma":[0.9994421,0.000079351434,0.00021253106,0.0000025012207,0.000023567944,0.00022865625,0.0000048771612,0.0000053609456,0.0000010451332],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9992606,0.000014762527,0.00024099364,0.00016434464,0.00019396067,0.00012533955],"domain_scores_gemma":[0.99981445,0.000028623852,0.00004058617,0.0000798613,0.000023071092,0.000013421819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035722024,0.00006991535,0.00008921865,0.00039274458,0.00009052865,0.000020283056,0.00006661706,0.000017624003,0.000011991658],"category_scores_gemma":[0.000003612352,0.000064697095,0.000009134469,0.0011532183,0.00003661566,0.00025146984,0.000016056121,0.000047841404,0.000005360774],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014043954,0.00012281687,0.006523901,0.00015039802,0.000023463099,0.00005232701,0.06737343,0.017386813,0.08988923,0.031800948,0.000114209826,0.78654844],"study_design_scores_gemma":[0.00082418113,0.00022166719,0.03269138,0.000024800136,0.000008119875,0.000052190015,0.9339234,0.01850343,0.012391366,0.0010431422,0.00010430394,0.00021198756],"about_ca_topic_score_codex":0.0002506623,"about_ca_topic_score_gemma":0.0025315383,"teacher_disagreement_score":0.86655,"about_ca_system_score_codex":0.000026640553,"about_ca_system_score_gemma":0.000014708194,"threshold_uncertainty_score":0.26382712},"labels":[],"label_agreement":null},{"id":"W4388962040","doi":"10.1007/978-3-031-44742-6_14","title":"The Multi-Objective Optimization Ratio Analysis (MOORA) in Uncertainty Environment","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in computational intelligence","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mathematical optimization; Computer science; Mathematics","score_opus":0.05129540939322504,"score_gpt":0.29185189545525436,"score_spread":0.2405564860620293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388962040","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00002678777,0.003301166,0.9816259,0.00014606015,0.0011774511,0.00048100244,0.00005402402,0.00014401384,0.013043579],"genre_scores_gemma":[0.69599,0.08704312,0.060065802,0.00022922595,0.00084464275,0.0014215605,0.0015865421,0.00043547037,0.1523836],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985957,0.000031259373,0.00060512446,0.00030835814,0.00029287237,0.00016667451],"domain_scores_gemma":[0.998931,0.00065097446,0.000109601,0.00015503837,0.00013129631,0.000022110962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024278766,0.00026266847,0.00032370997,0.00043922057,0.00013400165,0.00003583135,0.00015842126,0.00013647809,0.000050460803],"category_scores_gemma":[0.00005825327,0.00022850145,0.00011831155,0.000321245,0.00028283495,0.00006790281,0.00006155907,0.00036211198,0.00007192834],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006035756,0.000005000481,0.0000612225,0.0000144795495,0.00049943035,0.00000436964,0.00059542916,0.9303108,1.287793e-7,0.05949906,0.00006525639,0.008938801],"study_design_scores_gemma":[0.00005551753,0.0000125655,0.0001769673,0.00007623428,0.00006882325,0.0000012185851,0.00089580327,0.9588634,0.00000477449,0.03903357,0.00059459516,0.00021657946],"about_ca_topic_score_codex":0.000020610172,"about_ca_topic_score_gemma":0.0010205513,"teacher_disagreement_score":0.9215601,"about_ca_system_score_codex":0.00060181395,"about_ca_system_score_gemma":0.00003334901,"threshold_uncertainty_score":0.93180186},"labels":[],"label_agreement":null},{"id":"W4388971245","doi":"10.3390/buildings13122933","title":"Identification of Occupant Dissatisfaction Factors in Newly Constructed Apartments: Text Mining and Semantic Network Analysis","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Apartment; Post-occupancy evaluation; Identification (biology); Computer science; Receipt; Lexical analysis; Engineering; World Wide Web; Architectural engineering; Artificial intelligence; Civil engineering","score_opus":0.008826616983771554,"score_gpt":0.22920857149073623,"score_spread":0.22038195450696468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388971245","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9926344,0.000054178738,0.0067587565,0.000012362587,0.00023514585,0.000086016385,0.000009523345,0.00014495006,0.0000646686],"genre_scores_gemma":[0.99955267,0.000060054615,0.0002901676,0.0000023644968,0.000018585184,0.000009431659,0.000035202735,0.000009129249,0.00002239116],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992907,0.000016530292,0.00032602253,0.00013642263,0.00009977937,0.00013053727],"domain_scores_gemma":[0.99972445,0.00004968623,0.000077142555,0.00009232112,0.00002828098,0.000028100507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011651235,0.000090504276,0.00016761324,0.00036571003,0.00004069904,0.00003147199,0.000036905665,0.000060312545,0.000026347403],"category_scores_gemma":[0.000025344814,0.00009150364,0.00004071722,0.0014035209,0.00003796281,0.00015291067,0.000010003336,0.000051089795,0.0000026123932],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052158084,0.000003452179,0.9316337,0.000035714136,0.00017658368,6.185235e-7,0.00054568547,0.024041556,0.030516665,0.0009545129,0.0002960742,0.011790206],"study_design_scores_gemma":[0.00018016325,0.000007165477,0.89260435,0.000034450783,0.00013374157,0.0000021151209,0.0010463465,0.09908183,0.006456761,0.00026210095,0.00007341177,0.0001175821],"about_ca_topic_score_codex":0.00007692707,"about_ca_topic_score_gemma":0.00012761833,"teacher_disagreement_score":0.07504027,"about_ca_system_score_codex":0.000035549983,"about_ca_system_score_gemma":0.000005972492,"threshold_uncertainty_score":0.37314102},"labels":[],"label_agreement":null},{"id":"W4389143464","doi":"10.3390/buildings13122973","title":"Analytical Hierarchical Process as a Multicriteria Decision Tool in Material Selection for Prefabricated Wood Buildings","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Analytic hierarchy process; Architectural engineering; Multiple-criteria decision analysis; Quality (philosophy); Process (computing); Computer science; Popularity; Material selection; Civil engineering; Construction engineering; Engineering; Operations research; Materials science","score_opus":0.01082374620698374,"score_gpt":0.2725178034097161,"score_spread":0.26169405720273237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389143464","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97733665,0.000006587842,0.020757295,0.00010868085,0.000569126,0.0003902361,0.000016426291,0.0006790723,0.00013590798],"genre_scores_gemma":[0.99419034,0.000010450659,0.0052012876,0.00002949315,0.00019011217,0.00021949114,0.000037642345,0.000041178842,0.00008001645],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988113,0.000013741894,0.00036242369,0.00029601777,0.00018059573,0.00033588946],"domain_scores_gemma":[0.999645,0.00008567912,0.000030502586,0.00009609764,0.0000877827,0.0000549405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020442414,0.00017041308,0.00019829367,0.00038726284,0.000074159456,0.00012332512,0.00012668715,0.00018302143,0.00010108947],"category_scores_gemma":[0.00020571625,0.00016990262,0.0000644178,0.0008976949,0.00003312337,0.00023749887,0.000021517253,0.00016728287,0.00004614473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018695828,0.0001969142,0.0086509865,0.0006527532,0.00015188477,0.000015538324,0.0020053904,0.017231127,0.58284974,0.04098301,0.013526697,0.33186635],"study_design_scores_gemma":[0.0021542222,0.00021703361,0.0057888115,0.00023189827,0.000047273934,0.000086654516,0.00017153594,0.8389091,0.11524992,0.022142397,0.014359097,0.0006420921],"about_ca_topic_score_codex":0.00002634543,"about_ca_topic_score_gemma":0.000010569867,"teacher_disagreement_score":0.8216779,"about_ca_system_score_codex":0.000119032266,"about_ca_system_score_gemma":0.00003350261,"threshold_uncertainty_score":0.6928428},"labels":[],"label_agreement":null},{"id":"W4389192008","doi":"10.22215/etd/2023-15650","title":"Towards Smart Building Maintenance: Leveraging Multi-Source Data and Digital Twins with Ecological Momentary Assessment","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Facility management; Workflow; Computer science; Data management; Analytics; Data science; Systems engineering; Engineering; Data mining; Database","score_opus":0.024479716622410566,"score_gpt":0.2736661860075656,"score_spread":0.24918646938515504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389192008","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8602084,0.00013529912,0.115912825,0.000107798616,0.0021396712,0.00053701666,0.00024637263,0.0014908672,0.019221773],"genre_scores_gemma":[0.975751,0.0001567296,0.010419615,0.000042231284,0.00012850766,0.00006491854,0.005109569,0.000093889656,0.008233579],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988573,0.000009811679,0.0002593252,0.00041743903,0.0002142718,0.00024183682],"domain_scores_gemma":[0.99950475,0.000033725773,0.000051086838,0.00028617002,0.00004835728,0.000075942],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000921462,0.00028203422,0.00025355752,0.00013378516,0.00009736362,0.00025887386,0.00021336747,0.00017440235,0.00009824592],"category_scores_gemma":[0.000013658146,0.00022132776,0.00003183329,0.00014938317,0.00002940656,0.00037581476,0.000066439854,0.00038579846,0.000010232113],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012285706,0.00020539966,0.02816544,0.0011781114,0.0014686659,0.00012612296,0.002181397,0.0068901437,0.0023179925,0.0025620651,0.021080498,0.93370134],"study_design_scores_gemma":[0.0023052741,0.00022907429,0.23685808,0.00096739794,0.0002985906,0.00016277112,0.03721486,0.6835295,0.00061917957,0.00038047304,0.03537449,0.002060337],"about_ca_topic_score_codex":0.00007852841,"about_ca_topic_score_gemma":0.00038385743,"teacher_disagreement_score":0.931641,"about_ca_system_score_codex":0.00014042162,"about_ca_system_score_gemma":0.000060244987,"threshold_uncertainty_score":0.90254843},"labels":[],"label_agreement":null},{"id":"W4389206928","doi":"10.22215/etd/2023-15781","title":"An Analysis of the National Digital Twin Programme in the United Kingdom","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Government of the United Kingdom","keywords":"Engineering; Culmination; Architecture; Product (mathematics); Lean manufacturing; Twin cities; Kingdom; Engineering management; Manufacturing engineering; Geography","score_opus":0.025789296035665432,"score_gpt":0.2743078878510197,"score_spread":0.2485185918153543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389206928","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98871243,0.0000055901414,0.00013741231,0.000030861956,0.00034586914,0.00016561364,0.000042796157,0.00012131906,0.010438131],"genre_scores_gemma":[0.9966666,0.0000017194549,0.000017011078,0.000017050872,0.00003373363,0.00004357972,0.0026113386,0.000013043494,0.00059590477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992781,0.000022305907,0.00022526614,0.00009110673,0.00030041125,0.00008278793],"domain_scores_gemma":[0.99965227,0.000048575228,0.000049283364,0.00011863466,0.000120234225,0.000011003215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011245372,0.00009781301,0.00011585219,0.000543583,0.000028256625,0.000085854204,0.00019738387,0.00011518721,0.000046558103],"category_scores_gemma":[0.000035089306,0.000056859306,0.00012026885,0.0025172366,0.000016325333,0.00008518932,0.0000025449244,0.00016926107,0.000004502665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008662887,0.0004096026,0.084443815,0.00041227898,0.005351292,0.0000033733138,0.019883623,0.4320829,0.0017674519,0.336718,0.0044343323,0.11440672],"study_design_scores_gemma":[0.0002501663,0.00002748013,0.5413364,0.00007642238,0.00058278075,0.0000018860317,0.017107133,0.43354788,0.00054113264,0.0019299347,0.004231786,0.0003670004],"about_ca_topic_score_codex":0.00031486672,"about_ca_topic_score_gemma":0.00469952,"teacher_disagreement_score":0.45689258,"about_ca_system_score_codex":0.000040169813,"about_ca_system_score_gemma":0.00002901743,"threshold_uncertainty_score":0.26224422},"labels":[],"label_agreement":null},{"id":"W4389333406","doi":"10.7202/1105859ar","title":"OBSERVATIONS CONCERNANT CERTAINS CHANGEMENTS APPORTÉS AU CODE CIVIL PAR LA LOI MODIFIANT LE CODE CIVIL ET D’AUTRES DISPOSITIONS LÉGISLATIVES EN MATIÈRE DE RECHERCHE","year":2013,"lang":"fr","type":"article","venue":"Revue de droit Université de Sherbrooke","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université de Sherbrooke; Musée de la Civilisation","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.049275345925272745,"score_gpt":0.25563878306749643,"score_spread":0.2063634371422237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389333406","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35015875,0.0023931658,0.22577201,0.016796364,0.001086575,0.0013842542,0.0012663101,0.0005984808,0.40054408],"genre_scores_gemma":[0.8255981,0.005043145,0.021263745,0.0003661016,0.0007628957,0.00019528606,0.00046467694,0.00017750188,0.14612855],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99767053,0.00060852093,0.00040514645,0.0004098977,0.0001835023,0.00072242337],"domain_scores_gemma":[0.9985161,0.00042586203,0.00016729912,0.00040325272,0.00016587609,0.00032165585],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00054242584,0.00038188236,0.00036680055,0.0001860403,0.0004290646,0.00011427038,0.00037436208,0.0006818505,0.002002814],"category_scores_gemma":[0.000090386995,0.0005011951,0.00022184291,0.0004137922,0.0002050857,0.00073061424,0.00011442122,0.00081026717,0.0001450881],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000083674146,0.0005610037,0.026872162,0.0016460201,0.0013092543,0.00025653688,0.06809378,0.026041444,0.10624364,0.72186464,0.025226748,0.021801118],"study_design_scores_gemma":[0.0027877798,0.00018361436,0.071667045,0.003171805,0.0008115526,0.00056241977,0.015589545,0.3102459,0.026533777,0.0230002,0.54365784,0.0017884865],"about_ca_topic_score_codex":0.0071787466,"about_ca_topic_score_gemma":0.04183283,"teacher_disagreement_score":0.6988644,"about_ca_system_score_codex":0.0067487075,"about_ca_system_score_gemma":0.00068821997,"threshold_uncertainty_score":0.99974394},"labels":[],"label_agreement":null},{"id":"W4389380616","doi":"10.1016/j.autcon.2023.105228","title":"Simulation-based comparison of push- and pull-based planning in panelized construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Association for Canadian and Québec Literatures; University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Factory (object-oriented programming); Discrete event simulation; Engineering; Reduction (mathematics); Construction management; Event (particle physics); Computer science; Construction engineering; Systems engineering; Operations research; Simulation; Civil engineering","score_opus":0.023004955165500683,"score_gpt":0.2858671143505609,"score_spread":0.26286215918506023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389380616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9405355,0.000062390616,0.05747284,0.00007106473,0.0007440873,0.0002621855,0.000009689998,0.00053448614,0.00030776326],"genre_scores_gemma":[0.99438095,0.000005239356,0.005422791,0.000009817884,0.000027106253,0.000047816695,0.000086319735,0.000017681617,0.000002252408],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99868226,0.000075244396,0.00069057295,0.00019874435,0.000177165,0.00017604041],"domain_scores_gemma":[0.9992077,0.00038534487,0.0001568055,0.00013113553,0.00008325464,0.000035756322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022148169,0.00015665616,0.0002661352,0.001016786,0.00005709973,0.000035219593,0.000049508104,0.00018163485,0.000046235113],"category_scores_gemma":[0.00012153664,0.00018493427,0.000036973852,0.001112265,0.00014115195,0.00027608962,0.000006310469,0.00018492444,0.000009028552],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021033979,0.000008844144,0.17545529,0.00008405986,0.000005552328,6.9792185e-7,0.00023017179,0.776565,0.0015860649,0.0012915448,0.000010577752,0.044741124],"study_design_scores_gemma":[0.0010936244,0.000020184649,0.06514196,0.0001431747,0.000008534703,0.0000032274152,0.0009539144,0.92673135,0.004670018,0.0010168351,0.00006607746,0.00015110741],"about_ca_topic_score_codex":0.000041773725,"about_ca_topic_score_gemma":0.000052195002,"teacher_disagreement_score":0.1501663,"about_ca_system_score_codex":0.000113994945,"about_ca_system_score_gemma":0.000053507865,"threshold_uncertainty_score":0.75414},"labels":[],"label_agreement":null},{"id":"W4389583822","doi":"10.1063/5.0169643","title":"Influence of BIM on work breakdown structure in the construction industry","year":2023,"lang":"en","type":"article","venue":"AIP conference proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Construction industry; Work (physics); Computer science; Construction engineering; Engineering; Mechanical engineering","score_opus":0.012549111122422171,"score_gpt":0.21889038893788718,"score_spread":0.20634127781546502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389583822","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9961417,0.000008053238,0.00005040574,0.00029639737,0.00014066829,0.000129774,0.0000095893,0.00016794312,0.0030555038],"genre_scores_gemma":[0.9997285,0.0000259838,0.000074085394,0.0000621416,0.00004978544,0.000025268379,0.000005088558,0.000009505313,0.000019622647],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99927396,0.00000635673,0.00021702949,0.00014135303,0.00019364455,0.00016763475],"domain_scores_gemma":[0.9996781,0.00003194753,0.00005304001,0.00008519252,0.00012559013,0.000026160293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000107564534,0.00012540171,0.00012003629,0.00019547957,0.000041969623,0.00005213795,0.00019117846,0.00022906475,0.000046992165],"category_scores_gemma":[0.000046611243,0.000096315365,0.00002306471,0.001096277,0.000109538814,0.00020595385,0.000013156403,0.0005511617,0.000016465368],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006870428,0.000026316784,0.58854216,0.00025976094,0.000052271705,0.0000043024415,0.008718859,0.0067615244,0.051031083,0.26628852,0.003161515,0.07508499],"study_design_scores_gemma":[0.0005221089,0.00011158658,0.93804383,0.0005588989,0.000022618988,0.0000677208,0.008486615,0.00841946,0.012104434,0.029357746,0.0018661325,0.00043884147],"about_ca_topic_score_codex":0.00001587489,"about_ca_topic_score_gemma":0.0000070975157,"teacher_disagreement_score":0.3495017,"about_ca_system_score_codex":0.000028154029,"about_ca_system_score_gemma":0.000027868622,"threshold_uncertainty_score":0.39276266},"labels":[],"label_agreement":null},{"id":"W4389626402","doi":"10.3390/buildings13123087","title":"Towards Human–Robot Collaboration in Construction: Understanding Brickwork Production Rate Factors","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Brickwork; Context (archaeology); Engineering; Productivity; Variance (accounting); Operations management; Production (economics); Mathematics; Operations research; Knowledge management; Marketing; Management; Statistics; Computer science; Business; Geography; Civil engineering; Economics; Accounting","score_opus":0.03158551655730162,"score_gpt":0.25943120301444195,"score_spread":0.22784568645714032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389626402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.980692,0.00005530036,0.012146126,0.0003918418,0.0028630472,0.00022137346,0.000004668481,0.0009894042,0.0026362205],"genre_scores_gemma":[0.99882776,0.000045327397,0.0006608344,0.000010702893,0.00020667352,0.000025864829,0.000033999422,0.000025163075,0.00016365685],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991608,0.000026402238,0.0002578417,0.00021210096,0.00013896146,0.00020389674],"domain_scores_gemma":[0.99972904,0.000017035332,0.000045154484,0.000118140095,0.00005104313,0.00003959573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019463533,0.00014152552,0.00013517079,0.00037620537,0.00015544238,0.00010151136,0.00006235659,0.00010991865,0.00008230607],"category_scores_gemma":[0.00004487308,0.00015187604,0.000034258628,0.0016561435,0.000058540252,0.00038547543,0.000011806497,0.00016100329,0.000027855694],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048820322,0.000039540617,0.047836974,0.0002882448,0.00013974686,0.000020498466,0.0062544933,0.14057082,0.2840261,0.4725406,0.026741479,0.021492716],"study_design_scores_gemma":[0.00393135,0.0002799458,0.18085577,0.001134914,0.00016930695,0.00022449874,0.08277957,0.043075882,0.42900053,0.20465145,0.049969234,0.0039275573],"about_ca_topic_score_codex":0.000030156833,"about_ca_topic_score_gemma":0.00006998886,"teacher_disagreement_score":0.26788914,"about_ca_system_score_codex":0.0004405337,"about_ca_system_score_gemma":0.000031011343,"threshold_uncertainty_score":0.6193325},"labels":[],"label_agreement":null},{"id":"W4389746675","doi":"10.1007/979-8-8688-0005-4_4","title":"Setting Up Your Workspace","year":2023,"lang":"en","type":"book-chapter","venue":"Apress eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Delta-Q Technologies (Canada)","funders":"","keywords":"Workspace; Workflow; Set (abstract data type); Section (typography); Computer science; Tracing; Engineering drawing; World Wide Web; Human–computer interaction; Computer graphics (images); Engineering; Artificial intelligence; Operating system; Database; Programming language","score_opus":0.024574578824021316,"score_gpt":0.21646331027137403,"score_spread":0.19188873144735272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389746675","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000021886886,0.00022793617,0.0019512223,0.000018525861,0.002733809,0.00012961804,0.00002564127,0.0011421089,0.99374926],"genre_scores_gemma":[0.0021828155,0.000041877043,0.00032625656,0.000028620821,0.0005312533,0.000027146118,0.000027159618,0.00014310887,0.99669176],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99927014,0.000004066422,0.00020605377,0.00018950863,0.0001555623,0.00017467713],"domain_scores_gemma":[0.9995628,0.00003305082,0.00005116945,0.00025892034,0.000040288644,0.000053783602],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00004596193,0.00024507497,0.00018716394,0.00011297732,0.00005925073,0.00005921499,0.00012458452,0.0003610114,0.000122011],"category_scores_gemma":[0.0000049204727,0.0002604648,0.00010320575,0.000007720972,0.000038667877,0.000030972602,0.000033943445,0.000459746,0.0004447643],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051216025,5.4735943e-7,0.0000027835388,0.0001326358,0.00018745338,0.000015421416,0.00045568042,0.0004975186,0.0002822589,0.6623366,0.028720362,0.30736363],"study_design_scores_gemma":[0.0002019351,0.0000103671755,0.000008960846,0.0006186249,0.00009211563,0.000025982248,0.00008581052,0.001987005,0.0010103037,0.043604158,0.9516527,0.0007020077],"about_ca_topic_score_codex":0.000006650207,"about_ca_topic_score_gemma":0.000022688724,"teacher_disagreement_score":0.9229324,"about_ca_system_score_codex":0.000038317892,"about_ca_system_score_gemma":0.000015638696,"threshold_uncertainty_score":0.99998474},"labels":[],"label_agreement":null},{"id":"W4390047559","doi":"10.1016/j.compind.2023.104063","title":"Neural semantic tagging for natural language-based search in building information models: Implications for practice","year":2023,"lang":"en","type":"article","venue":"Computers in Industry","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Computer science; Semantic search; Natural language; Information extraction; Artificial intelligence; Deep learning; Schema (genetic algorithms); Information retrieval; Data science; Natural language processing; Semantic Web","score_opus":0.029952105593646434,"score_gpt":0.30156472329395007,"score_spread":0.27161261770030365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390047559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4270934,0.00006638997,0.5680764,0.0025524877,0.00102366,0.00063538936,0.000025716112,0.00036362177,0.00016299036],"genre_scores_gemma":[0.9821337,0.0000025063675,0.017270708,0.00021886852,0.000083481034,0.00018248285,0.00009117993,0.000012043666,0.00000506813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994094,0.00001561483,0.00021935551,0.00009350738,0.000060121132,0.00020201138],"domain_scores_gemma":[0.9994748,0.00030636124,0.000029128305,0.00010427226,0.000060801533,0.000024630499],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020383309,0.00008202607,0.00008459987,0.00036120543,0.000053518128,0.000067685636,0.00010407237,0.0001460215,7.687648e-7],"category_scores_gemma":[0.000067215224,0.000093044415,0.00003153185,0.0004759498,0.000013488318,0.0006900357,0.000015111415,0.00037158094,0.0000016107065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011366169,0.0000049489304,0.0003511219,0.00008827224,0.00000590488,4.4689733e-7,0.00054319395,0.8939215,0.00039242397,0.0042217895,0.00086768536,0.099591345],"study_design_scores_gemma":[0.00048122564,0.00000894938,0.001014251,0.00006678199,0.0000036953502,0.000005398892,0.0008534904,0.996257,0.00032101935,0.00050537346,0.0003862854,0.00009654273],"about_ca_topic_score_codex":0.00002243334,"about_ca_topic_score_gemma":0.000009484307,"teacher_disagreement_score":0.5550403,"about_ca_system_score_codex":0.00011722194,"about_ca_system_score_gemma":0.000033264067,"threshold_uncertainty_score":0.3794241},"labels":[],"label_agreement":null},{"id":"W4390052999","doi":"10.47960/2232-9080.2023.26.13.64","title":"Time deviation analysis of the baseline plan on the case study: Implementation of reinforced concrete works on a school construction project in the Republic of Croatia","year":2023,"lang":"en","type":"article","venue":"E-Zbornik elektronički zbornik radova Građevinskog fakulteta","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Orthopaedic Innovation Centre","funders":"","keywords":"Baseline (sea); Plan (archaeology); Reinforced concrete; Engineering; Civil engineering; Political science; Geography; Structural engineering; Archaeology; Law","score_opus":0.017984442705895116,"score_gpt":0.2659995791787084,"score_spread":0.2480151364728133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390052999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9964437,0.00006646432,0.00043982491,0.00025624118,0.00026783464,0.0017321045,0.00025781704,0.00011550308,0.00042052363],"genre_scores_gemma":[0.99920815,0.000074205964,0.00009778216,0.000062018335,0.00007017499,0.00018158498,0.00022515573,0.000033852244,0.000047089463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965793,0.0007211276,0.0013207486,0.00036459722,0.0006743875,0.00033983213],"domain_scores_gemma":[0.9970668,0.00092501735,0.0006830243,0.00097513176,0.00030825575,0.000041749987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018601321,0.00034685986,0.0005776162,0.0009912846,0.00020456624,0.00006771804,0.00047792008,0.0001507988,0.00026456435],"category_scores_gemma":[0.00053255324,0.00021116351,0.0003187681,0.005131419,0.00022815185,0.00025420563,0.00004637496,0.00053033227,0.000017450471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020431937,0.00045380986,0.14605308,0.0012133898,0.015219934,0.00020878506,0.050279632,0.44994128,0.035931807,0.052598625,0.028135171,0.21792129],"study_design_scores_gemma":[0.007374835,0.0020388428,0.2028105,0.000884435,0.004725889,0.00026955482,0.21132024,0.544709,0.022566644,0.00022017639,0.0016060978,0.0014737792],"about_ca_topic_score_codex":0.0007829228,"about_ca_topic_score_gemma":0.0009214637,"teacher_disagreement_score":0.21644752,"about_ca_system_score_codex":0.00015914974,"about_ca_system_score_gemma":0.00020863696,"threshold_uncertainty_score":0.86109984},"labels":[],"label_agreement":null},{"id":"W4390140118","doi":"10.47982/jfde.2023.2.a1","title":"Off-site prefabricated hybrid façade systems","year":2023,"lang":"en","type":"article","venue":"Journal of Facade Design and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cascades (Canada)","funders":"Horizon 2020 Framework Programme; European Commission","keywords":"Architectural engineering; Popularity; Computer science; Engineering","score_opus":0.015051588708807483,"score_gpt":0.19672238100770703,"score_spread":0.18167079229889954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390140118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48279706,0.0038791008,0.511013,0.00006460008,0.0015547919,0.00011872962,0.0000052838236,0.00041957697,0.0001478782],"genre_scores_gemma":[0.9976886,0.0009656585,0.0010496968,0.0000051881084,0.00018320594,0.0000042431257,0.0000017940835,0.000023185843,0.000078417754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934554,0.000012798692,0.00029517064,0.00005769484,0.00013371787,0.0001550927],"domain_scores_gemma":[0.9997212,0.000047965623,0.000047061956,0.00005089662,0.00004182965,0.00009103055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002138493,0.00010803558,0.00016492537,0.000275276,0.000025373836,0.000054326254,0.000064547996,0.000061875035,0.000004924551],"category_scores_gemma":[0.000021227528,0.00009711241,0.00004241841,0.00022833566,0.000008374995,0.0001968582,0.000006570015,0.0002574987,0.000016448188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000776179,0.0000022906231,0.00009762777,0.000085280604,0.000074112126,0.000029529832,0.00015538023,0.8918336,0.09246029,0.00026416522,0.004302942,0.010687002],"study_design_scores_gemma":[0.00026676277,0.00003971625,0.0020656835,0.00012285273,0.00002557105,0.0005493976,0.00006779672,0.973684,0.0073492224,0.000028170518,0.015646348,0.0001544909],"about_ca_topic_score_codex":0.0000011461783,"about_ca_topic_score_gemma":2.8780413e-8,"teacher_disagreement_score":0.51489156,"about_ca_system_score_codex":0.00003547303,"about_ca_system_score_gemma":0.000009329657,"threshold_uncertainty_score":0.39601293},"labels":[],"label_agreement":null},{"id":"W4390453510","doi":"10.17678/beuscitech.1279862","title":"Issues and Challenges in the Philippine Construction Industry: An Opportunity for BIM Adoption","year":2023,"lang":"en","type":"article","venue":"Bitlis Eren University Journal of Science and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Outsourcing; Building information modeling; Productivity; Quarter (Canadian coin); Business; Construction industry; Descriptive statistics; Reliability (semiconductor); Marketing; Operations management; Engineering; Economic growth; Economics; Construction engineering; Geography; Mathematics","score_opus":0.05630538412192636,"score_gpt":0.24343722330601197,"score_spread":0.1871318391840856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390453510","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99457276,0.00033395147,0.00013557238,0.0045186887,0.0001051611,0.000045903067,0.0000024659544,0.00004039998,0.0002451005],"genre_scores_gemma":[0.9940454,0.005514418,0.00040086624,0.0000059566228,0.000023152565,2.3818464e-7,4.9670143e-7,0.0000014492948,0.000008029835],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99970007,0.000010289743,0.000068404406,0.00006224574,0.000082098944,0.000076881835],"domain_scores_gemma":[0.99973345,0.000012752617,0.000037485093,0.000049866543,0.00013600991,0.000030429876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040897724,0.000037598784,0.000063185405,0.00075952697,0.000118947355,0.000017040547,0.00012127572,0.000105749736,0.000003322178],"category_scores_gemma":[0.00004119269,0.000030184496,0.0000066180723,0.00075914466,0.0005585999,0.00038897377,0.00001548302,0.00016726088,1.7560919e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014189315,0.000012407194,0.0034671358,0.00002290773,0.000009148901,0.000008913944,0.000743744,0.000028078939,0.004581283,0.13136981,0.00011240669,0.85963],"study_design_scores_gemma":[0.003198321,0.0018374538,0.09970468,0.00024317659,0.000094031835,0.0032246239,0.5760453,0.01727191,0.0063780467,0.08251514,0.20886791,0.0006194434],"about_ca_topic_score_codex":0.000004359928,"about_ca_topic_score_gemma":0.00003661038,"teacher_disagreement_score":0.8590105,"about_ca_system_score_codex":0.000023272609,"about_ca_system_score_gemma":0.000044619683,"threshold_uncertainty_score":0.20581846},"labels":[],"label_agreement":null},{"id":"W4390469579","doi":"10.11113/intrest.v17n2.308","title":"Bibliometric Review of Research Trends in Facilities Management Technologies from 2000 to 2023","year":2023,"lang":"en","type":"article","venue":"Malaysian journal of real estate/International journal of real estate studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Emerging technologies; The Internet; Mainland China; Citation; China; Bibliometrics; Computer science; Data science; Facility management; Interoperability; Engineering management; Business; World Wide Web; Geography; Engineering; Marketing","score_opus":0.05272011542931842,"score_gpt":0.3661777685448777,"score_spread":0.3134576531155593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390469579","genre_codex":"empirical","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9480158,0.011577821,0.00026216495,0.0052145305,0.0033255697,0.00026073723,0.00029856936,0.00012319296,0.030921632],"genre_scores_gemma":[0.23981808,0.75829226,0.0011876854,0.000008858896,0.00015123788,0.000008495956,0.000011035668,0.00002242367,0.00049991376],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9959458,0.00014269141,0.0017552866,0.00016556418,0.0016200811,0.00037056854],"domain_scores_gemma":[0.996665,0.0003348924,0.0005995036,0.00017121794,0.0021144995,0.00011486645],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0019747033,0.00024211088,0.00074627093,0.038146812,0.000051692918,0.00006591848,0.0007375333,0.00007565406,0.00007417486],"category_scores_gemma":[0.00030929956,0.00019585925,0.00026441735,0.019980503,0.00021320114,0.0004901231,0.00015859694,0.00061883876,0.000020164622],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020668635,0.00004685576,0.002658294,0.00067639427,0.0010655774,0.0010391113,0.002158122,0.0068488466,0.0001985143,0.0001430321,0.016025295,0.9689333],"study_design_scores_gemma":[0.009975293,0.005401877,0.27297622,0.06537923,0.00081951194,0.0030295916,0.3413453,0.0036707246,0.005799945,0.011821583,0.2774301,0.0023506372],"about_ca_topic_score_codex":0.00026771193,"about_ca_topic_score_gemma":0.00013687366,"teacher_disagreement_score":0.96658266,"about_ca_system_score_codex":0.000520609,"about_ca_system_score_gemma":0.000094656396,"threshold_uncertainty_score":0.97275496},"labels":[],"label_agreement":null},{"id":"W4390517059","doi":"10.35483/acsa.aia.inter.22.23","title":"Circular Economy Design towards a Resilient Zero Waste Future","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Circular economy; Demolition waste; Demolition; Zero waste; Typology; Municipal solid waste; Waste management; Solid waste management; Stakeholder; Engineering; Construction waste; Stock (firearms); Business; Civil engineering; Environmental planning; Environmental economics; Environmental science; Geography; Economics; Mechanical engineering","score_opus":0.009305100071054331,"score_gpt":0.18394155569588064,"score_spread":0.1746364556248263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390517059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029308718,0.0009043234,0.7723696,0.0006328582,0.0026740178,0.00031574798,0.000008845126,0.00069881347,0.19308703],"genre_scores_gemma":[0.9964207,0.000011767029,0.0019635279,0.00015531082,0.00016164448,0.00010288751,0.0000069685907,0.000014410717,0.0011628192],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99961656,0.000022346168,0.00010271206,0.00009256199,0.00006894156,0.00009690182],"domain_scores_gemma":[0.9998217,0.0000043901086,0.000009554995,0.000119172066,0.0000136513845,0.000031523396],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000070323054,0.000067731606,0.000061044644,0.00005364897,0.00008858428,0.000021678372,0.00007111533,0.000025308305,0.0022065714],"category_scores_gemma":[9.911373e-7,0.000066992674,0.000039311886,0.00009665809,0.000007288994,0.000065422566,0.000016520296,0.00012004571,0.000028205324],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024781306,0.00003090203,0.00011561471,0.00006115343,0.00012468794,0.000013973573,0.00085004646,0.5624514,0.00666321,0.08635376,0.19868319,0.14462726],"study_design_scores_gemma":[0.0003616723,0.00006511749,0.00009467291,0.0000027730673,0.000016664126,0.000087892484,0.0030108492,0.14213215,0.014381442,0.0060634175,0.8334825,0.0003008586],"about_ca_topic_score_codex":0.000006519868,"about_ca_topic_score_gemma":0.000001009384,"teacher_disagreement_score":0.96711195,"about_ca_system_score_codex":0.00009420714,"about_ca_system_score_gemma":0.000022275872,"threshold_uncertainty_score":0.99870557},"labels":[],"label_agreement":null},{"id":"W4390520494","doi":"10.23977/jaip.2023.060810","title":"The current research status of knowledge graph in bridge and its application prospects","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Current (fluid); Computer science; Graph; Engineering; Theoretical computer science; Electrical engineering; Medicine","score_opus":0.10441379885104311,"score_gpt":0.40917963390742224,"score_spread":0.3047658350563791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390520494","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93535465,0.022659658,0.032986496,0.0017149674,0.00283479,0.0007410879,0.000007030549,0.00007352439,0.0036278162],"genre_scores_gemma":[0.98917294,0.010591925,0.00007686354,0.0000016163467,0.00012947332,0.000011223291,3.7810713e-7,0.000007100629,0.000008498826],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886703,0.00011961282,0.0004916599,0.00007128823,0.00025355536,0.00019683105],"domain_scores_gemma":[0.9982701,0.0007762744,0.0001521974,0.00008171913,0.0006625635,0.0000571749],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015642426,0.000056818906,0.00009392916,0.0002959673,0.00008994418,0.00005056483,0.00010818998,0.00003386953,0.0000029375392],"category_scores_gemma":[0.0012002288,0.00004378448,0.000027692091,0.0010402232,0.00007486521,0.00038172325,0.00001991106,0.0005388302,0.00003276911],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008646829,0.00005145709,0.00034173942,0.000042183172,0.000015233789,0.00000219974,0.0016208213,0.0014071667,0.0055995486,0.06104754,0.00021811387,0.9295675],"study_design_scores_gemma":[0.0002230243,0.0006664797,0.037210856,0.0005433096,0.00008696253,0.0001961362,0.016108692,0.3303649,0.23854367,0.18521504,0.19035764,0.00048325013],"about_ca_topic_score_codex":0.000014879628,"about_ca_topic_score_gemma":0.00012195644,"teacher_disagreement_score":0.9290843,"about_ca_system_score_codex":0.00006325821,"about_ca_system_score_gemma":0.000085306245,"threshold_uncertainty_score":0.2340979},"labels":[],"label_agreement":null},{"id":"W4390556308","doi":"10.32970/cs.2023.1.1","title":"History of Fib International PhD symposia in civil engineering","year":2023,"lang":"en","type":"article","venue":"Vasbetonépítés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Danmarks Tekniske Universitet; Eidgenössische Technische Hochschule Zürich; Technische Universiteit Delft; Budapesti Műszaki és Gazdaságtudományi Egyetem; Université Laval","keywords":"Engineering; Engineering ethics; Library science; Political science; Advice (programming); Engineering management; Computer science","score_opus":0.012980695543062326,"score_gpt":0.19001253532842757,"score_spread":0.17703183978536524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390556308","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81912607,0.0012450375,0.0038752547,0.00027657018,0.015147284,0.0002274193,0.00001720379,0.0016328742,0.15845232],"genre_scores_gemma":[0.9983771,0.000082413404,0.00013925442,0.000009042878,0.00009164787,0.000018683555,0.00001733043,0.00001758299,0.0012469852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999505,0.000004804277,0.00018478012,0.00008279614,0.00011118392,0.00011143122],"domain_scores_gemma":[0.9998177,0.000025732283,0.00001683888,0.00009249146,0.000023555904,0.000023646982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000070416354,0.000075869444,0.00009330965,0.0003036424,0.0000044804538,0.000004974706,0.00009546891,0.000060344828,0.0003287119],"category_scores_gemma":[0.00001551569,0.000084917934,0.000040042367,0.00021056278,0.0000131839915,0.00010287897,0.000013817409,0.00010419991,0.00009287179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029343983,0.00007891893,0.031028604,0.00048313895,0.00029113784,0.000047253983,0.005075936,0.3678967,0.32515648,0.08656879,0.104308374,0.07903532],"study_design_scores_gemma":[0.0006903747,0.000026416821,0.048955105,0.00016859875,0.000013516559,0.000011650583,0.00019893429,0.52508724,0.008391133,0.0005159354,0.4155595,0.00038158795],"about_ca_topic_score_codex":0.000017361874,"about_ca_topic_score_gemma":0.000046390418,"teacher_disagreement_score":0.31676534,"about_ca_system_score_codex":0.00025733918,"about_ca_system_score_gemma":0.000023017363,"threshold_uncertainty_score":0.35991648},"labels":[],"label_agreement":null},{"id":"W4390650925","doi":"10.23977/jaip.2023.060903","title":"The Role of Artificial Intelligence in Construction Management: A Case Study of Smart Worksite Systems","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering; Knowledge management","score_opus":0.03066380018887798,"score_gpt":0.29638175419797114,"score_spread":0.26571795400909315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390650925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.939315,0.00063839194,0.05548235,0.00008855767,0.0030449084,0.00047133723,0.0000027022886,0.000047366913,0.00090937316],"genre_scores_gemma":[0.99860376,0.0004478938,0.00075275503,0.000002878365,0.00014698172,0.000019836614,3.3605997e-7,0.00001623829,0.00000933282],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9972496,0.00023551901,0.0017097746,0.00013679489,0.00045291212,0.00021541875],"domain_scores_gemma":[0.99773574,0.000718177,0.0007539516,0.00023471333,0.00050015084,0.000057265686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001549439,0.0001521622,0.0002908109,0.0005258253,0.00012368438,0.00011146965,0.0002378787,0.0000901853,0.000016575566],"category_scores_gemma":[0.00035999727,0.0001264181,0.00008940827,0.0014507534,0.00013650475,0.0005988754,0.00003701829,0.0004703875,0.000021681473],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047277802,0.0002901637,0.00043516292,0.00006532099,0.00025293248,0.0005123972,0.010938095,0.12864289,0.00087724923,0.03737004,0.000022155215,0.8201208],"study_design_scores_gemma":[0.000039833045,0.00036517475,0.000046254816,0.0001541624,0.00014209187,0.0020690137,0.7924999,0.18625589,0.010466535,0.0071830475,0.00062675605,0.00015132269],"about_ca_topic_score_codex":0.00022191244,"about_ca_topic_score_gemma":0.0003979639,"teacher_disagreement_score":0.8199695,"about_ca_system_score_codex":0.00007658643,"about_ca_system_score_gemma":0.000039245806,"threshold_uncertainty_score":0.51551807},"labels":[],"label_agreement":null},{"id":"W4390684474","doi":"10.1590/s1678-86212024000100717","title":"Curricular BIM implementation plan: protocol proposal and pilot application in Brazil","year":2024,"lang":"en","type":"article","venue":"Ambiente Construído","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Scope (computer science); Engineering management; Plan (archaeology); Curriculum; Competence (human resources); Protocol (science); Action plan; Computer science; Maturity (psychological); Process management; Process (computing); Knowledge management; Engineering; Political science; Management; Pedagogy; Medicine; Psychology","score_opus":0.0073900331987254795,"score_gpt":0.2738910028876137,"score_spread":0.2665009696888882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390684474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83370405,0.00063199876,0.07100809,0.0007804538,0.0016576326,0.081359535,0.00011429813,0.002074668,0.008669271],"genre_scores_gemma":[0.9742616,0.000011544722,0.0005632616,0.00002462087,0.00006249071,0.025001893,0.000038720547,0.000018105298,0.000017805827],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993197,0.00001747433,0.00022755074,0.00019192364,0.0001035943,0.00013977464],"domain_scores_gemma":[0.9998168,0.0000129058335,0.000017669958,0.00009119336,0.000022934208,0.000038516257],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008562129,0.000113934286,0.00008497501,0.00015733273,0.000034965793,0.00009419418,0.00004382635,0.000043383094,0.00006010203],"category_scores_gemma":[0.0000026279124,0.000108069806,0.000018832197,0.00025358508,0.000055171276,0.00023166552,0.000012908597,0.00013469881,0.000041473882],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029424365,0.000040663184,0.06343248,0.0004651571,0.000045048215,0.000012605305,0.00029750806,0.00011664242,0.020698778,0.15075918,0.0025251592,0.76157737],"study_design_scores_gemma":[0.007666279,0.0009569082,0.06608101,0.0011240024,0.0001285742,0.00094617164,0.003173328,0.3299547,0.082138576,0.028778778,0.47688058,0.0021710761],"about_ca_topic_score_codex":0.00006991894,"about_ca_topic_score_gemma":0.00019873359,"teacher_disagreement_score":0.75940627,"about_ca_system_score_codex":0.000057989397,"about_ca_system_score_gemma":0.000036810205,"threshold_uncertainty_score":0.44069588},"labels":[],"label_agreement":null},{"id":"W4390691624","doi":"10.2139/ssrn.4680842","title":"The Durability of Innovative Blocks Through Cyclic Testing and Actual Climate Exposure","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Durability; Forensic engineering; Reliability engineering; Computer science; Engineering; Programming language","score_opus":0.010464945793250685,"score_gpt":0.23333737594421564,"score_spread":0.22287243015096495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390691624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9771147,0.016524216,0.0020453846,0.00024763483,0.0011380585,0.00017410013,0.000019540077,0.00012340822,0.002613001],"genre_scores_gemma":[0.9929929,0.006387047,0.00024557332,0.0000057681987,0.00028120194,0.00001475551,0.0000029017074,0.000028086546,0.00004181333],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9982123,0.000053135973,0.0005110974,0.00018598954,0.00017644717,0.0008610579],"domain_scores_gemma":[0.9992112,0.00017391455,0.00017063493,0.00018370121,0.00023610558,0.000024471146],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0009993196,0.00022140938,0.00023140962,0.00006601125,0.00018206441,0.00012112116,0.00017665872,0.0002009027,0.0000056224985],"category_scores_gemma":[0.00015669482,0.00015512157,0.00007650329,0.00026096785,0.00013013996,0.000069964335,0.00015385884,0.0048581217,0.0000021294504],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006920685,0.000028406183,0.005954548,0.0005076037,0.0014088852,0.0000035746216,0.0026158616,0.0029910386,0.003990093,0.45205882,0.0001385227,0.53023344],"study_design_scores_gemma":[0.00021881392,0.0001447841,0.0013982997,0.00028305018,0.00008059911,0.00061737275,0.0034847327,0.0025973732,0.0015399505,0.98907954,0.00027977454,0.0002757152],"about_ca_topic_score_codex":0.000026069773,"about_ca_topic_score_gemma":0.00022574999,"teacher_disagreement_score":0.53702074,"about_ca_system_score_codex":0.00043232617,"about_ca_system_score_gemma":0.0007681153,"threshold_uncertainty_score":0.9974377},"labels":[],"label_agreement":null},{"id":"W4390952031","doi":"10.23977/jaip.2023.060813","title":"The Role of Artificial Intelligence in Construction Management: A Case Study of Smart Worksite Systems","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Digitization; Context (archaeology); Big data; Cloud computing; Knowledge management; Industry 4.0; Computer science; Quality (philosophy); Data science; Engineering; Telecommunications","score_opus":0.03066380018887798,"score_gpt":0.29638175419797114,"score_spread":0.26571795400909315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390952031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.939315,0.00063839194,0.05548235,0.00008855767,0.0030449084,0.00047133723,0.0000027022886,0.000047366913,0.00090937316],"genre_scores_gemma":[0.99860376,0.0004478938,0.00075275503,0.000002878365,0.00014698172,0.000019836614,3.3605997e-7,0.00001623829,0.00000933282],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9972496,0.00023551901,0.0017097746,0.00013679489,0.00045291212,0.00021541875],"domain_scores_gemma":[0.99773574,0.000718177,0.0007539516,0.00023471333,0.00050015084,0.000057265686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001549439,0.0001521622,0.0002908109,0.0005258253,0.00012368438,0.00011146965,0.0002378787,0.0000901853,0.000016575566],"category_scores_gemma":[0.00035999727,0.0001264181,0.00008940827,0.0014507534,0.00013650475,0.0005988754,0.00003701829,0.0004703875,0.000021681473],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047277802,0.0002901637,0.00043516292,0.00006532099,0.00025293248,0.0005123972,0.010938095,0.12864289,0.00087724923,0.03737004,0.000022155215,0.8201208],"study_design_scores_gemma":[0.000039833045,0.00036517475,0.000046254816,0.0001541624,0.00014209187,0.0020690137,0.7924999,0.18625589,0.010466535,0.0071830475,0.00062675605,0.00015132269],"about_ca_topic_score_codex":0.00022191244,"about_ca_topic_score_gemma":0.0003979639,"teacher_disagreement_score":0.8199695,"about_ca_system_score_codex":0.00007658643,"about_ca_system_score_gemma":0.000039245806,"threshold_uncertainty_score":0.51551807},"labels":[],"label_agreement":null},{"id":"W4391039262","doi":"10.1109/smarttechcon57526.2023.10391656","title":"Multiple Target Research of Construction Progress on the Basis of on BIM and Decide Tree Algorithms","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Urbanization; Pace; Computer science; Field (mathematics); Population; Urban planning; Operations research; Architectural engineering; Civil engineering; Engineering; Geography; Economic growth; Economics; Mathematics","score_opus":0.04625676865955494,"score_gpt":0.2926245513470313,"score_spread":0.24636778268747636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391039262","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905834,0.000044111082,0.0012241373,0.00037491877,0.0002588729,0.0002088509,0.0000185011,0.00012690602,0.0071603064],"genre_scores_gemma":[0.9973521,0.00004896972,0.0024320069,0.0000046520486,0.000032270953,0.000029912304,0.0000046294604,0.000008915302,0.00008654865],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99940073,0.000041035186,0.00014931898,0.000089782116,0.00021347989,0.00010565928],"domain_scores_gemma":[0.99946856,0.0002674139,0.000019839552,0.00013017675,0.0000921175,0.000021872533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027069193,0.000058891634,0.000084145504,0.00019323187,0.00005027227,0.000011013805,0.000055014993,0.000051205854,0.00007267843],"category_scores_gemma":[0.00005572168,0.000038842347,0.000025005433,0.00041175087,0.00018772892,0.000038552174,0.000011809882,0.00012164736,0.000012909078],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008712842,0.000042278163,0.025732068,0.00010416076,0.0000985139,0.0000015354279,0.00039513793,0.0017492863,0.010241325,0.16083373,0.0049473797,0.7957674],"study_design_scores_gemma":[0.0006001745,0.0002808872,0.040122136,0.00012591865,0.0000089111145,0.000009107772,0.00445168,0.20099668,0.7455274,0.0060481927,0.0016798773,0.00014907419],"about_ca_topic_score_codex":0.000029683466,"about_ca_topic_score_gemma":0.000030222733,"teacher_disagreement_score":0.79561836,"about_ca_system_score_codex":0.000014390077,"about_ca_system_score_gemma":0.000009582835,"threshold_uncertainty_score":0.15839449},"labels":[],"label_agreement":null},{"id":"W4391060541","doi":"10.5267/j.uscm.2023.11.010","title":"The impact of digital marketing on the adoption of building information modeling system in Jordanian interior design companies: The moderating role of credibility","year":2024,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Credibility; Moderation; Structural equation modeling; Marketing; Digital marketing; Social media; Business; Building information modeling; Source credibility; Marketing strategy; Computer science; Engineering; World Wide Web; Operations management","score_opus":0.012316290951532083,"score_gpt":0.22468291579462588,"score_spread":0.2123666248430938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391060541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6174124,0.00023878682,0.37922394,0.00007052561,0.00016158001,0.0007676179,0.000022313248,0.00007428107,0.0020285477],"genre_scores_gemma":[0.9993731,0.000028533115,0.00049758435,0.0000022875283,0.000019536603,0.000058272428,0.0000068520494,0.000009522335,0.000004311224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988446,0.00012677786,0.00058037677,0.0000914363,0.00021879729,0.00013796134],"domain_scores_gemma":[0.99919677,0.00040834758,0.00009771848,0.00022268173,0.00006238965,0.0000121035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016195365,0.00012481342,0.00013635808,0.00013552602,0.000088911154,0.00014360818,0.0001871681,0.000034867306,0.0000048684456],"category_scores_gemma":[0.000059205762,0.00006709414,0.00009464188,0.00027080294,0.00004044714,0.0002690823,0.000040466733,0.00015212203,7.8647645e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005695333,0.000004460925,0.00014913091,0.00031657497,0.0000731592,1.7125673e-7,0.0018356545,0.94667035,0.00041410714,0.021049814,0.000024166342,0.029405458],"study_design_scores_gemma":[0.00007977652,0.00003213598,0.00021928328,0.00070103223,0.000012055916,0.000001264264,0.024585888,0.9732265,0.00035280705,0.0007149355,0.000017191775,0.00005717175],"about_ca_topic_score_codex":0.000109674584,"about_ca_topic_score_gemma":0.000010801541,"teacher_disagreement_score":0.3819607,"about_ca_system_score_codex":0.0002455852,"about_ca_system_score_gemma":0.00001699046,"threshold_uncertainty_score":0.27360195},"labels":[],"label_agreement":null},{"id":"W4391104463","doi":"10.3390/buildings14010285","title":"Design for Manufacturing and Assembly (DfMA) in Construction: A Holistic Review of Current Trends and Future Directions","year":2024,"lang":"en","type":"review","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sustainability; Thematic analysis; Engineering; Transformative learning; Management science; Process management; Engineering management; Computer science; Qualitative research","score_opus":0.048258504884143315,"score_gpt":0.32543290861704,"score_spread":0.2771744037328967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391104463","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000060174393,0.9947008,0.0031148393,0.00003241436,0.001459908,0.00039868383,0.00004852579,0.00009047394,0.0001483302],"genre_scores_gemma":[0.0000072297107,0.9969649,0.0023914853,0.000003465014,0.00029938793,0.00024998465,0.000021833352,0.000034635515,0.00002708097],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990639,0.000028221468,0.00045972443,0.00024706224,0.0000744236,0.00012665999],"domain_scores_gemma":[0.9996595,0.00006902888,0.00009663891,0.00010525941,0.000026317273,0.000043269676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015592456,0.0002652194,0.0007567587,0.00040790474,0.000034621127,0.000042466036,0.000052930074,0.00015324011,0.000014612561],"category_scores_gemma":[0.00001314547,0.00022315212,0.0001360916,0.00029995292,0.000045185356,0.0000782766,0.000016624092,0.00028898616,9.546967e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.4336166e-7,0.0000020798632,1.8330074e-7,0.101835236,0.00003696113,4.0322487e-7,0.000016090606,7.0902706e-7,5.0041285e-7,0.001741204,0.0007826509,0.89558333],"study_design_scores_gemma":[0.00006505567,0.0000118609105,0.0000019979204,0.06272504,0.0006618296,0.00019612077,0.00001023566,0.00008202548,0.000009549116,0.0001882398,0.93586344,0.00018461671],"about_ca_topic_score_codex":0.000002221128,"about_ca_topic_score_gemma":0.000002279185,"teacher_disagreement_score":0.93508077,"about_ca_system_score_codex":0.00007813766,"about_ca_system_score_gemma":0.000036170033,"threshold_uncertainty_score":0.9099879},"labels":[],"label_agreement":null},{"id":"W4391319575","doi":"10.18280/mmep.110123","title":"A Novel Time Management Approach for the Construction Industry: A Mathematical Analysis","year":2024,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Management science; Operations research; Engineering","score_opus":0.0188388119743645,"score_gpt":0.20018107945758934,"score_spread":0.18134226748322485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391319575","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010307095,0.00047595068,0.9954423,0.000058532358,0.00009068831,0.00034757023,0.000009993195,0.0005644593,0.0019798116],"genre_scores_gemma":[0.42332044,0.00008855708,0.57517475,0.000007841207,0.00013034765,0.000588868,0.00001961433,0.00007058114,0.000598994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991806,0.0000032977027,0.00027855864,0.00019782264,0.00013286287,0.00020685441],"domain_scores_gemma":[0.9996118,0.00013916875,0.000011986165,0.00015620538,0.000019568979,0.00006128422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023935505,0.00017953818,0.00021368203,0.00017760182,0.000068185356,0.00019985091,0.00007858234,0.00015679307,0.000040442537],"category_scores_gemma":[0.0000059478393,0.00012718115,0.00011580542,0.000407186,0.000041732066,0.00008283876,0.000015530626,0.00027743078,0.000012301321],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001038584,0.000010459921,3.3471144e-7,0.0010483906,0.0005184128,2.0497421e-7,0.0001463023,0.81023365,0.0001120196,0.1850954,0.00003551639,0.002798291],"study_design_scores_gemma":[0.00008388246,0.0000075182884,8.306221e-7,0.0001263321,0.00055881124,0.000043814372,0.00006234173,0.9832369,0.000035723282,0.015035574,0.0006554926,0.00015276899],"about_ca_topic_score_codex":7.399762e-7,"about_ca_topic_score_gemma":3.582912e-8,"teacher_disagreement_score":0.42228973,"about_ca_system_score_codex":0.000029295014,"about_ca_system_score_gemma":0.0000036878025,"threshold_uncertainty_score":0.51862967},"labels":[],"label_agreement":null},{"id":"W4391381579","doi":"10.1109/wsc60868.2023.10407243","title":"Integrated Analysis and Simulation for Enhancing Wall Assembly Process Efficiency by Resolving Bottlenecks","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bottleneck; Process (computing); Workflow; Computer science; Resource (disambiguation); sync; Workstation; Idle; Resource efficiency; Production (economics); Scope (computer science); Manufacturing engineering; Process engineering; Engineering; Operating system; Embedded system","score_opus":0.008264913984671683,"score_gpt":0.2494455242277185,"score_spread":0.24118061024304682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391381579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4539183,0.000046997073,0.5447423,0.000022862676,0.000070256785,0.00011066855,0.000005617606,0.0004295887,0.0006534139],"genre_scores_gemma":[0.9988687,0.000012600207,0.00058753276,0.000013926056,0.00001815024,0.000039105023,0.000076777505,0.000012954041,0.00037025163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994261,0.0000075633507,0.00019116985,0.00014759866,0.00008450136,0.0001430661],"domain_scores_gemma":[0.9996792,0.00010446302,0.00002258864,0.000069813934,0.0000902795,0.000033659355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013593782,0.0000910078,0.000114699,0.00024190421,0.000082188875,0.000062012834,0.000040145205,0.000068650406,0.000028637784],"category_scores_gemma":[0.000058232996,0.000080921316,0.000043768316,0.0010124695,0.000010677107,0.0001458142,0.0000045423676,0.000057594705,0.000005648875],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018303515,0.000010726785,0.0022621923,0.00012529048,0.00023767077,3.3525933e-7,0.0007709612,0.8712638,0.07404004,0.00045670863,0.00096850557,0.049845435],"study_design_scores_gemma":[0.00015753867,0.000013140458,0.000517072,0.00001021826,0.00006744065,2.7909755e-7,0.0003649266,0.97758305,0.020625751,0.000108561544,0.00045036204,0.00010164611],"about_ca_topic_score_codex":0.000028942819,"about_ca_topic_score_gemma":0.00024388905,"teacher_disagreement_score":0.5449504,"about_ca_system_score_codex":0.000028875742,"about_ca_system_score_gemma":0.000009348545,"threshold_uncertainty_score":0.32998756},"labels":[],"label_agreement":null},{"id":"W4391381690","doi":"10.1109/wsc60868.2023.10407712","title":"Simulation Modeling For Sustainable Construction: A Case Study To Highlight The Social Aspect","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Flexibility (engineering); Workload; Resource (disambiguation); Computer science; Idle; Component (thermodynamics); Discrete event simulation; Product (mathematics); Resource allocation; Manufacturing engineering; Operations research; Engineering; Simulation; Operating system; Computer network","score_opus":0.023815134682976257,"score_gpt":0.28320866307155784,"score_spread":0.2593935283885816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391381690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6786121,0.000004962897,0.31722286,0.0002927724,0.0003330941,0.00070288894,0.0000019821102,0.0006559619,0.0021733767],"genre_scores_gemma":[0.99825406,3.9971974e-7,0.00033532546,0.00002019623,0.00027071618,0.00013668557,0.0000030731815,0.000014546512,0.0009649804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949133,0.000013577249,0.00014647546,0.00010587665,0.0000830637,0.000159693],"domain_scores_gemma":[0.99966896,0.000063713065,0.0000096584,0.00008266761,0.00015112906,0.000023892348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014201055,0.000077090044,0.000071938244,0.00009770252,0.0004191996,0.00008316135,0.00004153741,0.00003064332,0.000037737722],"category_scores_gemma":[0.000023832592,0.000058516176,0.00003863569,0.0004037288,0.000009961012,0.00012752895,0.0000132660325,0.00005453195,0.00002181685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006839026,0.0000064038836,0.000032773485,0.000010622438,0.000024628984,0.000023952587,0.0022619704,0.964388,0.000015246165,0.027183976,0.00078510103,0.0052604764],"study_design_scores_gemma":[0.00019142084,0.000028429127,0.000010221881,0.0000010519676,0.000016253434,0.000042003827,0.09429095,0.9027267,0.00004447002,0.0011421934,0.0014293613,0.000076908436],"about_ca_topic_score_codex":0.00013567529,"about_ca_topic_score_gemma":0.00014983858,"teacher_disagreement_score":0.31964198,"about_ca_system_score_codex":0.000062249244,"about_ca_system_score_gemma":0.000014220517,"threshold_uncertainty_score":0.3224187},"labels":[],"label_agreement":null},{"id":"W4391382594","doi":"10.1109/wsc60868.2023.10407242","title":"Hybrid Approaches For Handling Mobile Crane Location Problems In Construction Sites","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Boom; Modular design; Heuristics; Lift (data mining); Bridge (graph theory); Computer science; Plan (archaeology); Grid; Engineering; Mathematical optimization; Mathematics","score_opus":0.02875393550814201,"score_gpt":0.21414572928714054,"score_spread":0.18539179377899853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391382594","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6508109,0.00022966569,0.34386697,0.00005187319,0.0005607138,0.0007240807,0.0000083604,0.00096271356,0.0027847448],"genre_scores_gemma":[0.9968135,0.000042607844,0.0023111175,0.000004280153,0.00006773622,0.00046090534,0.0000976452,0.000013888256,0.00018833714],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954253,0.0000059758477,0.00016645905,0.00011119488,0.000053533066,0.00012029028],"domain_scores_gemma":[0.99983317,0.000030633917,0.000015173892,0.00006804461,0.000035212288,0.000017761455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000101379606,0.000072645045,0.00007856939,0.00015597578,0.00003940711,0.00003145558,0.00003164484,0.00004202048,0.000027404862],"category_scores_gemma":[0.000011687264,0.00007120163,0.000023320725,0.00026430373,0.00002221644,0.00014795418,0.000003925899,0.000055140983,0.000030947584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006351785,0.000011737261,0.0028565081,0.00028103494,0.000018786754,2.412735e-7,0.0003126859,0.70594126,0.0069758524,0.010676445,0.0008041668,0.27211496],"study_design_scores_gemma":[0.00032510204,0.00002302742,0.0005314756,0.00003099699,0.0000058544747,0.000011686151,0.0007307188,0.9731271,0.018254202,0.004833153,0.0019939367,0.0001326967],"about_ca_topic_score_codex":0.000010200161,"about_ca_topic_score_gemma":0.00004267754,"teacher_disagreement_score":0.3460026,"about_ca_system_score_codex":0.000035474604,"about_ca_system_score_gemma":0.000009841364,"threshold_uncertainty_score":0.29035184},"labels":[],"label_agreement":null},{"id":"W4391409121","doi":"10.1109/wsc60868.2023.10407539","title":"A Hybrid Simulation-Based Optimization Framework For Managing Modular Bridge Construction Projects: A Cable-Stayed Bridge Case Study","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Bridge (graph theory); Schedule; Performance indicator; Scalability; Key (lock); Discrete event simulation; Systems engineering; Computer science; Supply chain; Engineering; Industrial engineering; Reliability engineering; Simulation; Operating system","score_opus":0.030361656467051662,"score_gpt":0.27619528277036753,"score_spread":0.24583362630331587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391409121","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22521134,0.0000134878355,0.7713448,0.000046435987,0.0006325799,0.0011542147,0.000036738038,0.001424215,0.00013623523],"genre_scores_gemma":[0.9562142,0.0000042052197,0.04300256,0.000041473457,0.0001525214,0.00035896347,0.00012117572,0.000060622497,0.000044263725],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877745,0.00004022731,0.00038406308,0.0003260275,0.00018934484,0.00028287375],"domain_scores_gemma":[0.9991378,0.00026245922,0.00006488444,0.00027844447,0.00018835116,0.0000680164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019438492,0.00022227036,0.00020015401,0.00035989928,0.00025478157,0.00014216172,0.00007233269,0.00009290097,0.000087195214],"category_scores_gemma":[0.00010043094,0.00023882867,0.000084934705,0.00058705284,0.000033042477,0.0002845583,0.000012620553,0.00015634569,0.000018256529],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023707635,0.000029066605,0.0006743249,0.00007278447,0.00005077689,0.0000723108,0.0002838452,0.98788655,0.000024415114,0.0006967117,0.00014813623,0.010037385],"study_design_scores_gemma":[0.0008261369,0.00007516117,0.00016157013,0.000033141296,0.00005857326,0.00010727392,0.0015374749,0.995649,0.00036602374,0.000830112,0.000085208594,0.00027033125],"about_ca_topic_score_codex":0.00023750566,"about_ca_topic_score_gemma":0.00004443399,"teacher_disagreement_score":0.73100287,"about_ca_system_score_codex":0.0001232564,"about_ca_system_score_gemma":0.000045974615,"threshold_uncertainty_score":0.97391504},"labels":[],"label_agreement":null},{"id":"W4391424974","doi":"10.1007/978-3-031-35471-7_29","title":"Lifting and Rigging Study for Precast Volumetric Modular Construction in Nunavut","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Modular design; Architectural engineering; Computer science; Engineering; Civil engineering; Geology; Construction engineering; Programming language","score_opus":0.007524085791174915,"score_gpt":0.19599478258015463,"score_spread":0.1884706967889797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391424974","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05004501,0.031507332,0.8739794,0.000077713914,0.008601056,0.0037274768,0.0001055057,0.0020719345,0.029884562],"genre_scores_gemma":[0.9950363,0.00016515022,0.0036667483,0.0000050098697,0.00041282797,0.00011603704,0.000019038629,0.00017566339,0.00040322042],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986597,0.0000048676725,0.0004734167,0.000419912,0.0001559037,0.0002862559],"domain_scores_gemma":[0.99948883,0.00019844352,0.000045358054,0.00018284112,0.000036498925,0.000048045647],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017542481,0.0004346621,0.0004351948,0.0012515882,0.000032744287,0.000098472934,0.000088149216,0.0004116219,0.000028213097],"category_scores_gemma":[0.00009998218,0.0004872058,0.00008183258,0.00026702834,0.000023614966,0.00011552065,0.000033137225,0.00089286576,0.0000040254668],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009400663,0.000010162902,0.0011483907,0.0011475278,0.00015033648,0.000026252581,0.00084739237,0.87140375,0.00043149907,0.0069079837,0.000007810826,0.117909476],"study_design_scores_gemma":[0.00055438076,0.00007201692,0.0002340203,0.001348478,0.000096052296,0.000081777485,0.000035308934,0.9820612,0.00022943754,0.010501565,0.004044906,0.00074086344],"about_ca_topic_score_codex":0.000019567775,"about_ca_topic_score_gemma":0.0014538353,"teacher_disagreement_score":0.9449913,"about_ca_system_score_codex":0.00028559522,"about_ca_system_score_gemma":0.00001816351,"threshold_uncertainty_score":0.99975795},"labels":[],"label_agreement":null},{"id":"W4391425075","doi":"10.1007/978-3-031-35471-7","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Victoria; University of Regina; University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Political science; Engineering ethics; Library science; Engineering; Environmental ethics; Computer science; Philosophy","score_opus":0.0048875313991533055,"score_gpt":0.17312680135073075,"score_spread":0.16823926995157745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391425075","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022687573,0.06949389,0.21419245,0.0021632686,0.046668537,0.007761895,0.005019865,0.0057423124,0.62627023],"genre_scores_gemma":[0.99609554,0.00016096122,0.00081269856,0.000021848042,0.00038826567,0.000046780606,0.000025267196,0.00016688164,0.0022817885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984965,0.000002536907,0.0005050312,0.00028475394,0.0003306708,0.0003805551],"domain_scores_gemma":[0.99936944,0.000081661696,0.000079592224,0.00020768995,0.00017063638,0.00009096151],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014498326,0.00045067095,0.00048014073,0.0003791876,0.000031549513,0.00005039111,0.0003699363,0.000694994,0.00012731313],"category_scores_gemma":[0.00007261947,0.00041292986,0.00027510186,0.00051273516,0.000060703624,0.00011039611,0.00005883428,0.0014952223,0.0000029534335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003896495,0.000008957583,0.00020033027,0.0071442225,0.00044967816,0.00000436672,0.0049712774,0.94426167,0.011256852,0.012248302,0.015380616,0.0040698317],"study_design_scores_gemma":[0.00043233155,0.00006128892,0.0004774309,0.008106598,0.00024834572,0.00009392395,0.000083959676,0.8222642,0.024906967,0.0047419467,0.13685317,0.001729867],"about_ca_topic_score_codex":0.0008377375,"about_ca_topic_score_gemma":0.08941627,"teacher_disagreement_score":0.9734079,"about_ca_system_score_codex":0.00069909106,"about_ca_system_score_gemma":0.00040101816,"threshold_uncertainty_score":0.9998323},"labels":[],"label_agreement":null},{"id":"W4391482388","doi":"10.1016/j.jobe.2024.108647","title":"An OpenBIM-based 4D approach to support coordination meetings in virtual reality environments","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Virtual reality; Visualization; Computer science; Human–computer interaction; Schedule; Building information modeling; Virtual machine; Engineering; Scheduling (production processes); Artificial intelligence","score_opus":0.010455276638327734,"score_gpt":0.23419643450127747,"score_spread":0.22374115786294974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391482388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29810113,0.00006456583,0.70085794,0.000046095076,0.0006036206,0.000060747578,0.000002613706,0.00007706715,0.00018625167],"genre_scores_gemma":[0.98829913,0.000005528156,0.011454734,0.0000142885565,0.00017365655,0.0000071691748,0.000003956334,0.00003074269,0.0000108211525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912393,0.000014305957,0.00038345478,0.00011360089,0.00021187314,0.00015281395],"domain_scores_gemma":[0.9997317,0.000028444769,0.000033319284,0.0000911681,0.00001836328,0.000096968855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049635686,0.00012296875,0.00015957514,0.0004497707,0.000019991305,0.0001286405,0.00013137599,0.00007091019,0.000011398703],"category_scores_gemma":[0.000029566221,0.00012367747,0.00005569311,0.00027583187,0.000008186419,0.00043515413,0.000008174178,0.00028274063,0.0000021375395],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005436947,0.00001547043,0.00007852288,0.000042391843,0.000014986133,0.000008190498,0.00013519017,0.9076113,0.08173456,0.0016825424,0.00020820014,0.008463187],"study_design_scores_gemma":[0.00019625112,0.00009933421,0.00059794186,0.00016433033,0.000013401988,0.000056215857,0.000062629646,0.97631615,0.01685305,0.000028003707,0.0054629464,0.00014975075],"about_ca_topic_score_codex":0.00000538639,"about_ca_topic_score_gemma":0.0000012753319,"teacher_disagreement_score":0.690198,"about_ca_system_score_codex":0.00026092312,"about_ca_system_score_gemma":0.000030821335,"threshold_uncertainty_score":0.5043421},"labels":[],"label_agreement":null},{"id":"W4391526629","doi":"","title":"Illustration et recommandations d’un chantier avec recyclage et abaissement de la température","year":2022,"lang":"fr","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Art","score_opus":0.00803861649421637,"score_gpt":0.2166376959075715,"score_spread":0.20859907941335515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391526629","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08532907,0.0045718784,0.53645176,0.09268885,0.0020232422,0.0007094236,0.00036608553,0.0005722854,0.2772874],"genre_scores_gemma":[0.89691055,0.0020576832,0.05233697,0.000453496,0.00006138113,0.00025128323,0.0011073622,0.00007857296,0.04674272],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98954153,0.008820592,0.0004945022,0.00041845205,0.0003756911,0.0003492154],"domain_scores_gemma":[0.9973696,0.0008604656,0.00024198752,0.0008030232,0.0005751821,0.00014973899],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.006436482,0.00027765546,0.00021666463,0.00021196225,0.00084289856,0.00044244374,0.00044918119,0.00023001082,0.0026820651],"category_scores_gemma":[0.00037412342,0.00034803886,0.00015762533,0.0006803337,0.0001688436,0.00041895945,0.00022619372,0.0010929535,0.00004039977],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011912869,0.00045114994,0.00068942655,0.00007720512,0.00010621371,0.000007781078,0.025580924,0.0028304404,0.009026849,0.81835216,0.012672942,0.13019298],"study_design_scores_gemma":[0.0010645587,0.0000026786763,0.006385724,0.0006330983,0.000108643806,0.00027472136,0.0024135893,0.07993921,0.03378356,0.012875163,0.86181664,0.0007024129],"about_ca_topic_score_codex":0.0006733718,"about_ca_topic_score_gemma":0.0012677547,"teacher_disagreement_score":0.8491437,"about_ca_system_score_codex":0.00037470635,"about_ca_system_score_gemma":0.00028017137,"threshold_uncertainty_score":0.9998972},"labels":[],"label_agreement":null},{"id":"W4391532795","doi":"10.1007/978-3-031-34027-7","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Northern British Columbia; University of Victoria; University of Regina; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Political science; Engineering ethics; Engineering; Environmental ethics; Library science; Computer science; Philosophy","score_opus":0.0048875313991533055,"score_gpt":0.17312680135073075,"score_spread":0.16823926995157745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391532795","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022687573,0.06949389,0.21419245,0.0021632686,0.046668537,0.007761895,0.005019865,0.0057423124,0.62627023],"genre_scores_gemma":[0.99609554,0.00016096122,0.00081269856,0.000021848042,0.00038826567,0.000046780606,0.000025267196,0.00016688164,0.0022817885],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984965,0.000002536907,0.0005050312,0.00028475394,0.0003306708,0.0003805551],"domain_scores_gemma":[0.99936944,0.000081661696,0.000079592224,0.00020768995,0.00017063638,0.00009096151],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014498326,0.00045067095,0.00048014073,0.0003791876,0.000031549513,0.00005039111,0.0003699363,0.000694994,0.00012731313],"category_scores_gemma":[0.00007261947,0.00041292986,0.00027510186,0.00051273516,0.000060703624,0.00011039611,0.00005883428,0.0014952223,0.0000029534335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003896495,0.000008957583,0.00020033027,0.0071442225,0.00044967816,0.00000436672,0.0049712774,0.94426167,0.011256852,0.012248302,0.015380616,0.0040698317],"study_design_scores_gemma":[0.00043233155,0.00006128892,0.0004774309,0.008106598,0.00024834572,0.00009392395,0.000083959676,0.8222642,0.024906967,0.0047419467,0.13685317,0.001729867],"about_ca_topic_score_codex":0.0008377375,"about_ca_topic_score_gemma":0.08941627,"teacher_disagreement_score":0.9734079,"about_ca_system_score_codex":0.00069909106,"about_ca_system_score_gemma":0.00040101816,"threshold_uncertainty_score":0.9998323},"labels":[],"label_agreement":null},{"id":"W4391537168","doi":"10.54254/3006-1210/direct/0718","title":"How does artificial intelligence affect reliable engineering?","year":2024,"lang":"en","type":"article","venue":"Advances in Operation Research and Production Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Affect (linguistics); Artificial intelligence; Computer science; Psychology","score_opus":0.021413498853558897,"score_gpt":0.30926826513267214,"score_spread":0.2878547662791132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391537168","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10812084,0.08531645,0.7193711,0.026934618,0.026235286,0.0051065865,0.000019251365,0.0027618196,0.026134094],"genre_scores_gemma":[0.9780274,0.016361777,0.0027657363,0.000005444386,0.00035778107,0.00023176063,0.00000992428,0.000015201576,0.0022249673],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991897,0.000022282413,0.00013481415,0.00026276425,0.0002086244,0.00018182523],"domain_scores_gemma":[0.99977094,0.000023816014,0.0000044979956,0.000120043354,0.000048881462,0.000031793636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045811298,0.00008628145,0.0000626968,0.00037177766,0.00008409471,0.0004013539,0.000054679338,0.000032379277,0.000037477355],"category_scores_gemma":[0.000025501875,0.00006928483,0.000011808342,0.00050176313,0.00005112915,0.00093428255,0.000020067788,0.00022229196,0.000021265098],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011737558,0.000012729842,0.000043823697,0.0005275144,0.00001584084,0.0000069055523,0.00013634184,0.07963266,0.001414174,0.28974026,0.0006125298,0.62784547],"study_design_scores_gemma":[0.000062408304,0.00014475688,0.00013888939,0.0003537336,0.000008323131,0.000016470962,0.002102836,0.33277965,0.055204917,0.063372724,0.5454644,0.00035089182],"about_ca_topic_score_codex":0.0000032374342,"about_ca_topic_score_gemma":0.00005324515,"teacher_disagreement_score":0.8699066,"about_ca_system_score_codex":0.00007589289,"about_ca_system_score_gemma":0.000006077842,"threshold_uncertainty_score":0.3870265},"labels":[],"label_agreement":null},{"id":"W4391546788","doi":"10.1007/978-3-031-34027-7_33","title":"Prefabrication and Modular Construction—A Potential Solution to Affordable and Temporary Housing in Ontario?","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Prefabrication; Affordable housing; Modular design; Architectural engineering; Business; Civil engineering; Engineering; Construction engineering; Computer science; Programming language","score_opus":0.005897406704342116,"score_gpt":0.17094200283219266,"score_spread":0.16504459612785055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391546788","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.063778505,0.011504646,0.89137053,0.00024284804,0.00323784,0.0010066554,0.00003054547,0.0008533066,0.02797512],"genre_scores_gemma":[0.99354917,0.00017764069,0.005324156,0.000014101951,0.00015916409,0.000028330842,0.00003213704,0.00008802732,0.0006272536],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903816,0.000003322138,0.00030845907,0.00032773917,0.00012472851,0.00019762044],"domain_scores_gemma":[0.9997234,0.000027571527,0.000027935232,0.0001396757,0.000021256323,0.00006018302],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000076605495,0.00031001132,0.00026619012,0.00060445245,0.000029369758,0.00008355328,0.00004780818,0.00037612705,0.000033891032],"category_scores_gemma":[0.000012890518,0.00035422968,0.000036358113,0.00010345396,0.00002787898,0.00015286477,0.000036639613,0.00071233365,0.000004064718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012708895,0.0000037473292,0.00074809766,0.00043680123,0.000055512886,0.0000265553,0.0005270863,0.9285562,0.005522944,0.009475233,0.000018875717,0.054616224],"study_design_scores_gemma":[0.00071627763,0.00008761318,0.0034208572,0.0034754977,0.00013661485,0.00045981762,0.000021386766,0.9160054,0.0019838482,0.047888752,0.023969594,0.0018343498],"about_ca_topic_score_codex":0.0009656979,"about_ca_topic_score_gemma":0.03631415,"teacher_disagreement_score":0.9297707,"about_ca_system_score_codex":0.00040757385,"about_ca_system_score_gemma":0.000036819456,"threshold_uncertainty_score":0.999891},"labels":[],"label_agreement":null},{"id":"W4391564779","doi":"10.36680/j.itcon.2024.002","title":"Construction 4.0: A comparative analysis of research and practice","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Engineering; Engineering ethics","score_opus":0.021983456786992893,"score_gpt":0.32980386802271755,"score_spread":0.3078204112357247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391564779","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87558365,0.0019080922,0.11039374,0.0013071666,0.0018348389,0.00021471301,0.000018965819,0.0002113895,0.008527437],"genre_scores_gemma":[0.9815495,0.00054700905,0.017862309,0.000004357914,0.000024662197,0.0000035971048,0.0000039888187,0.0000025527756,0.0000019965187],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987968,0.000049019465,0.0007669397,0.000055248755,0.00023180383,0.000100140074],"domain_scores_gemma":[0.9987039,0.00025349323,0.00020448458,0.00008254704,0.00073148496,0.000024086223],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077959447,0.00007745939,0.00024742814,0.006349811,0.00003821181,0.000060541213,0.000071318296,0.00019730696,0.00002272837],"category_scores_gemma":[0.00020410746,0.0000722172,0.00004780426,0.0038472998,0.00050464045,0.0018863087,0.0000126904815,0.0005618045,0.0000036924955],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012319001,0.000018913013,0.0049357526,0.0001527454,0.0011923704,0.000006092054,0.0025147833,0.0051695458,0.0032554702,0.5937937,0.0002851486,0.3885523],"study_design_scores_gemma":[0.0029425437,0.001519477,0.011865299,0.0017435044,0.0021099409,0.022513406,0.25502315,0.3450642,0.116467915,0.19769523,0.04215471,0.0009006569],"about_ca_topic_score_codex":0.0000061296814,"about_ca_topic_score_gemma":0.000007211145,"teacher_disagreement_score":0.39609846,"about_ca_system_score_codex":0.00013616764,"about_ca_system_score_gemma":0.00006843942,"threshold_uncertainty_score":0.566587},"labels":[],"label_agreement":null},{"id":"W4391696891","doi":"10.1109/tem.2024.3364168","title":"The Role of Smart Heuristics in Decision-Making Under Uncertainty: Migitating Rework and Its Consequences","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Rework; Heuristics; Computer science; Operations research; Management science; Knowledge management; Manufacturing engineering; Engineering; Risk analysis (engineering); Process management; Business","score_opus":0.0057650174844591975,"score_gpt":0.21283416492539647,"score_spread":0.20706914744093727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391696891","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.045764443,0.0029556865,0.94824433,0.00006634801,0.0013926518,0.00019390546,0.000009279751,0.00027067354,0.0011026786],"genre_scores_gemma":[0.9976711,0.0005999644,0.001614472,0.000005698858,0.000013819971,0.000040830342,2.721058e-7,0.000018003486,0.000035834382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993915,0.000007727267,0.00022433563,0.00012216327,0.000121337274,0.00013295225],"domain_scores_gemma":[0.99955666,0.00030094464,0.000011207704,0.00009450037,0.000015996755,0.00002071063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000118661075,0.00011048551,0.000085590356,0.00019588428,0.000058158537,0.0000723183,0.00006545052,0.00003953683,0.000008337353],"category_scores_gemma":[0.00000479434,0.00009469579,0.000033954864,0.0002972744,0.00002554513,0.000078367826,0.000001185553,0.00017197897,0.0000045225393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005373639,0.0000037285402,0.0000018485649,0.000084476334,0.000052053605,0.0000034340737,0.000088852896,0.8115533,0.0002950821,0.014524946,0.000009754803,0.17337716],"study_design_scores_gemma":[0.00007341412,0.000019666195,0.00006101126,0.0007508789,0.000028533277,0.000008651266,0.0006253846,0.99064106,0.0016288847,0.0037966121,0.0022395442,0.00012638271],"about_ca_topic_score_codex":0.000004254353,"about_ca_topic_score_gemma":0.00003735319,"teacher_disagreement_score":0.9519067,"about_ca_system_score_codex":0.00006913616,"about_ca_system_score_gemma":0.0000064046358,"threshold_uncertainty_score":0.38615823},"labels":[],"label_agreement":null},{"id":"W4391707230","doi":"10.1061/jcemd4.coeng-13915","title":"Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Duration (music); Estimation; Scaffold; Statistics; Mathematics; Engineering; Art; Biomedical engineering; Systems engineering","score_opus":0.013689525768489887,"score_gpt":0.23306286990129885,"score_spread":0.21937334413280896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391707230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86396706,0.00039630278,0.1326355,0.000016617696,0.0025057334,0.00022606952,0.0000015309448,0.000100776626,0.0001503964],"genre_scores_gemma":[0.9938399,0.00012459037,0.0058365604,8.1610625e-7,0.00016708388,0.0000089714285,6.033749e-7,0.000011282985,0.000010166869],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925864,0.000015458387,0.00044386816,0.00007031246,0.00014230437,0.000069435184],"domain_scores_gemma":[0.99976176,0.000023973396,0.00006790918,0.000053489974,0.000064463806,0.00002838487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028753403,0.000095127274,0.00013581196,0.00052469055,0.00002808196,0.000072108814,0.00002666625,0.00004326812,0.0000056805293],"category_scores_gemma":[0.000016591019,0.00008841674,0.000042733627,0.0002788346,0.000016029102,0.00031207767,0.000008195397,0.00012990634,3.5861362e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004293001,0.00004146269,0.00017903297,0.0007790845,0.00063655566,0.00059925346,0.0013776496,0.28621086,0.00084650697,0.0090448065,0.0005890873,0.69965273],"study_design_scores_gemma":[0.0011920612,0.00032265633,0.00021053465,0.00073023676,0.0003980991,0.017791009,0.008602967,0.9651034,0.0018392632,0.00014238058,0.0034190204,0.00024838364],"about_ca_topic_score_codex":0.000008045181,"about_ca_topic_score_gemma":0.0000016647481,"teacher_disagreement_score":0.69940436,"about_ca_system_score_codex":0.000054063614,"about_ca_system_score_gemma":0.000015793454,"threshold_uncertainty_score":0.360553},"labels":[],"label_agreement":null},{"id":"W4391747171","doi":"10.3390/buildings14020496","title":"Full-Scale Implementation of an Automated Connecting Device for Modular Construction","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Cable gland; Systems engineering; Process (computing); Modular construction; Scale (ratio); Engineering; Computer science; Field (mathematics); Embedded system; Mechanical engineering; Operating system","score_opus":0.00874303277083623,"score_gpt":0.2810730989304804,"score_spread":0.27233006615964417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391747171","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9173736,0.00013030253,0.08027734,0.000030060686,0.0007219165,0.00015939157,0.000029187924,0.0011321581,0.00014605382],"genre_scores_gemma":[0.9670999,0.0000062222534,0.03270286,0.00000658449,0.000091812406,0.000028914277,0.000038916845,0.000020660913,0.000004122295],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995058,0.0000070366023,0.00020259243,0.00011976196,0.00006572888,0.00009906153],"domain_scores_gemma":[0.99979746,0.000022811912,0.000026908354,0.00006397645,0.000063340245,0.000025521087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009490995,0.00007658701,0.000083782725,0.00010103533,0.000047276444,0.00005130828,0.00003856275,0.00005478929,0.000058730806],"category_scores_gemma":[0.0000051813217,0.0000816033,0.000040643903,0.0001581104,0.000016423184,0.0002839284,0.0000040982404,0.00004914803,0.0000030178317],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010162076,0.0000040546024,0.000110242225,0.0002856547,0.000053008353,3.9904106e-7,0.0006570268,0.0042728265,0.6482356,0.015091039,0.0003472369,0.33093274],"study_design_scores_gemma":[0.0002657604,0.00008418003,0.00029276026,0.000069413836,0.000046880505,0.00006800645,0.0026642948,0.6653737,0.32257116,0.0011911608,0.007225083,0.0001476424],"about_ca_topic_score_codex":0.00004349113,"about_ca_topic_score_gemma":0.000057879315,"teacher_disagreement_score":0.66110086,"about_ca_system_score_codex":0.000047721056,"about_ca_system_score_gemma":0.00001551445,"threshold_uncertainty_score":0.3327686},"labels":[],"label_agreement":null},{"id":"W4391909581","doi":"10.5267/j.jpm.2024.1.001","title":"Project management approaches and their selection in the digital age: Overview, challenges and decision models","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Computer science; Data science; Management science; Engineering; Artificial intelligence","score_opus":0.06321626924180404,"score_gpt":0.2553401872433735,"score_spread":0.19212391800156944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391909581","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27441975,0.2852239,0.15411073,0.0012629449,0.0020724905,0.0048313118,0.000015258712,0.0004612178,0.2776024],"genre_scores_gemma":[0.9665446,0.030929103,0.0022646901,0.000012575533,0.00008384315,0.00004150371,0.0000010159853,0.0000149606785,0.00010767204],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928737,0.00002642078,0.00026264586,0.00013069266,0.00018142574,0.000111419286],"domain_scores_gemma":[0.99983937,0.000031939515,0.000036355283,0.000065491746,0.000013193759,0.00001367813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040373023,0.00013080185,0.00012680056,0.00044133572,0.00003301553,0.00029833656,0.0000905405,0.000036903297,0.0000011436183],"category_scores_gemma":[0.0000019718145,0.00007797523,0.00004607542,0.00023863543,0.000020339969,0.00044439975,0.000037919333,0.00017951497,6.6809974e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018224091,0.0000232032,0.000007693064,0.0005156729,0.00014635753,0.00003552123,0.002509014,0.0009927407,0.0000041363114,0.045514457,0.0008700148,0.949363],"study_design_scores_gemma":[0.0018522295,0.0005918717,0.006517476,0.0023972932,0.0003169494,0.0014666022,0.061034102,0.55728817,0.00006428137,0.15841268,0.2093189,0.00073943747],"about_ca_topic_score_codex":0.0000020769241,"about_ca_topic_score_gemma":0.000014670241,"teacher_disagreement_score":0.94862354,"about_ca_system_score_codex":0.000058379002,"about_ca_system_score_gemma":0.0000066726375,"threshold_uncertainty_score":0.31797376},"labels":[],"label_agreement":null},{"id":"W4392108726","doi":"10.5430/ijba.v15n1p21","title":"Analysis of Critical Factors and Strategies for Implementing and Using BIM in the Public Sector","year":2024,"lang":"en","type":"article","venue":"International Journal of Business Administration","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Public sector; Computer science; Business; Risk analysis (engineering); Process management; Industrial organization; Environmental economics; Economics; Economy","score_opus":0.045254711725430684,"score_gpt":0.32674000073798687,"score_spread":0.2814852890125562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392108726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8945506,0.0002696653,0.10417097,0.00046988507,0.00043371163,0.00003428944,0.000024811225,0.0000061110863,0.0000399248],"genre_scores_gemma":[0.999303,0.000028102231,0.00053922605,0.0000063671946,0.000104822306,0.00000185355,0.00001197839,0.0000041988637,4.4098414e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994068,0.000013943043,0.00031433866,0.000052141604,0.00015628051,0.000056494187],"domain_scores_gemma":[0.9994471,0.00015481332,0.00005635908,0.00002459651,0.0003028384,0.000014272473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021455892,0.000057766112,0.000100889345,0.0004268258,0.000021708332,0.00034644856,0.000059092577,0.000029874876,0.000015491318],"category_scores_gemma":[0.00006135275,0.000041313087,0.00004200645,0.00029649198,0.00004011279,0.0005686575,0.000004967358,0.000061795974,2.0715412e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000098224016,0.00012724004,0.09623477,0.0006496426,0.0022919043,0.00004812316,0.0039092037,0.005671726,0.032983664,0.816667,0.000058390622,0.041260093],"study_design_scores_gemma":[0.000664865,0.00016677703,0.25349343,0.00031397818,0.0010658987,0.0006027646,0.015729921,0.7067685,0.0026035656,0.016632551,0.0016489428,0.00030876446],"about_ca_topic_score_codex":0.000008768188,"about_ca_topic_score_gemma":0.000119627075,"teacher_disagreement_score":0.80003446,"about_ca_system_score_codex":0.000024776682,"about_ca_system_score_gemma":0.00008025576,"threshold_uncertainty_score":0.33408114},"labels":[],"label_agreement":null},{"id":"W4392370325","doi":"10.18280/ijsse.140104","title":"Integrate Building Information Modeling (BIM) and Occupant Characteristics Simulator to Assess the Effectiveness of Emergency Requirements","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Building information modeling; Simulation; Engineering; Transport engineering; Operations management","score_opus":0.014298401225557884,"score_gpt":0.264075819770073,"score_spread":0.2497774185445151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392370325","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5757207,0.00033301173,0.4217746,0.00004375049,0.0020012432,0.000053310854,0.000021480575,0.00002159437,0.000030273919],"genre_scores_gemma":[0.9987305,0.00067908666,0.00043064464,0.00000605617,0.00013909352,0.0000019174074,0.0000043240702,0.000007805612,5.855595e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992006,0.000019185667,0.0004535432,0.00005175892,0.0002008829,0.00007404809],"domain_scores_gemma":[0.99953413,0.000099488294,0.00005020413,0.00004086061,0.0002297269,0.00004556691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054003944,0.000097199314,0.00013512211,0.00019886352,0.000024510782,0.00007589876,0.00010409648,0.000042458276,0.000006326888],"category_scores_gemma":[0.00009783602,0.00007531695,0.000046361405,0.00010014369,0.000008473363,0.0006156745,0.000028038346,0.00019879844,5.3565367e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034633256,0.00001451675,0.0012127567,0.000902774,0.00065991824,0.000011558335,0.0021162764,0.84756297,0.029386777,0.07633908,0.000016359652,0.04143069],"study_design_scores_gemma":[0.00014902915,0.00002643083,0.0020449434,0.0006738541,0.000025009656,0.000059565256,0.00012040042,0.99283534,0.0019381794,0.0007739122,0.0012625607,0.000090783804],"about_ca_topic_score_codex":0.000004855141,"about_ca_topic_score_gemma":7.682643e-7,"teacher_disagreement_score":0.42300975,"about_ca_system_score_codex":0.000064036016,"about_ca_system_score_gemma":0.000015284013,"threshold_uncertainty_score":0.30713362},"labels":[],"label_agreement":null},{"id":"W4392400114","doi":"10.23977/jeis.2024.090107","title":"The Promotion of BIM Integrated Design in Building Engineering Construction","year":2024,"lang":"en","type":"article","venue":"Journal of Electronics and Information Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Promotion (chess); Construction engineering; Engineering; Architectural engineering; Political science","score_opus":0.005672506925393084,"score_gpt":0.20934018377241967,"score_spread":0.20366767684702658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392400114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4071794,0.0015698225,0.5900807,0.00011343649,0.000743173,0.00007247412,6.0835885e-7,0.00002339929,0.00021702326],"genre_scores_gemma":[0.99521524,0.0012634308,0.0034994034,0.000002129524,0.000015915264,0.0000012098654,1.7289733e-7,0.0000017530016,7.269367e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993742,0.0000065361514,0.00033930247,0.000025190591,0.00016034003,0.00009442211],"domain_scores_gemma":[0.9996779,0.000039208466,0.00006870638,0.00003108356,0.00016281272,0.00002031923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009057772,0.00004263858,0.0000558681,0.00037291518,0.000045958757,0.00015668735,0.00007156,0.000023531577,0.0000016698265],"category_scores_gemma":[0.0000781996,0.000028525485,0.000016053496,0.0007217724,0.00006457796,0.0027013165,0.000004387727,0.00017382953,3.4717868e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012022163,0.000002973037,0.00007216177,0.00005701131,0.000011726563,3.0829915e-7,0.00044693254,0.078296125,0.07554329,0.47973534,0.000028225415,0.36579388],"study_design_scores_gemma":[0.00008811151,0.00009279299,0.00048221793,0.00012092962,0.00000434641,0.00016366637,0.00019177073,0.94973147,0.041466244,0.0017676322,0.0058438606,0.00004696493],"about_ca_topic_score_codex":8.032349e-7,"about_ca_topic_score_gemma":6.202535e-7,"teacher_disagreement_score":0.87143534,"about_ca_system_score_codex":0.000111487316,"about_ca_system_score_gemma":0.00016219191,"threshold_uncertainty_score":0.19583893},"labels":[],"label_agreement":null},{"id":"W4392455782","doi":"10.1061/9780784485248.101","title":"Agile Project Planning Framework and Method for Allocating Limited Crews to Drainage Construction Projects","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Agile software development; Computer science; Drainage; Project management; Construction engineering; Engineering management; Systems engineering; Engineering; Software engineering","score_opus":0.026294119529623364,"score_gpt":0.31187372685180337,"score_spread":0.28557960732218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392455782","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012707565,0.00032220222,0.9731326,0.00013819503,0.0008742189,0.00061428244,0.000008547842,0.0009098232,0.011292558],"genre_scores_gemma":[0.2685075,0.000006619488,0.73053914,0.00010297237,0.0002547996,0.00028144923,0.0000098441515,0.00003433501,0.00026335486],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993516,0.00001811408,0.00017745692,0.00021749892,0.00006970997,0.00016558245],"domain_scores_gemma":[0.9995819,0.000235979,0.0000122687015,0.00008701224,0.000041951836,0.000040907766],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017181567,0.00012654952,0.0001148063,0.00021043715,0.000082115155,0.00018523115,0.00003806616,0.00011173915,0.000020779175],"category_scores_gemma":[0.00012734841,0.00011337066,0.000034717716,0.00034029983,0.000016869048,0.00015979231,0.000012348791,0.00016050795,0.000005456473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027148964,0.000006138643,0.00021898,0.00067991554,0.00013473532,0.0000039661045,0.0065274816,0.0031647943,0.022547912,0.24984872,0.0066108434,0.71022934],"study_design_scores_gemma":[0.00018703878,0.00018651554,0.00011208205,0.00088935357,0.00006613927,0.00018927362,0.0072718915,0.8944401,0.017172894,0.011351099,0.06762229,0.000511301],"about_ca_topic_score_codex":0.0000217942,"about_ca_topic_score_gemma":0.0000073765573,"teacher_disagreement_score":0.89127535,"about_ca_system_score_codex":0.00003979681,"about_ca_system_score_gemma":0.000027437653,"threshold_uncertainty_score":0.46231213},"labels":[],"label_agreement":null},{"id":"W4392456038","doi":"10.1061/9780784485231.029","title":"Expert Demonstration Collection of Long-Horizon Construction Tasks in Virtual Reality","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Virtual reality; Computer science; Human–computer interaction; Horizon; Mathematics","score_opus":0.01158095374483207,"score_gpt":0.23825916550267354,"score_spread":0.22667821175784147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392456038","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43456098,0.00047475,0.523354,0.00014600933,0.0031890296,0.00023156272,0.000008836926,0.0006802025,0.037354637],"genre_scores_gemma":[0.99896663,0.00014428163,0.00058561994,0.0000038125718,0.000091150134,0.0000229589,0.000017849849,0.000010546167,0.0001571465],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993544,0.000025033165,0.0002933391,0.00012961587,0.000108801796,0.00008879761],"domain_scores_gemma":[0.9998155,0.000026032203,0.000016195767,0.000081389924,0.000037316313,0.000023543922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001034471,0.000089564535,0.00010133899,0.0002121188,0.000023792598,0.000031797914,0.00002918496,0.00011924693,0.00017957299],"category_scores_gemma":[0.000008984283,0.0000879621,0.000039838287,0.00044915997,0.00005120046,0.000274389,0.0000036605952,0.00012855927,0.000010838596],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039422222,0.000028921868,0.0028336248,0.000114424474,0.000054741784,0.0000055533283,0.0005496449,0.008897816,0.049104888,0.104557,0.0051897895,0.8286242],"study_design_scores_gemma":[0.0006115642,0.00031787722,0.008932972,0.00028591312,0.000028572675,0.00023516436,0.0020191446,0.7113318,0.26753935,0.005755584,0.0024585212,0.0004835298],"about_ca_topic_score_codex":0.00012701243,"about_ca_topic_score_gemma":0.00052112795,"teacher_disagreement_score":0.8281406,"about_ca_system_score_codex":0.00012302103,"about_ca_system_score_gemma":0.00003775566,"threshold_uncertainty_score":0.35869905},"labels":[],"label_agreement":null},{"id":"W4392456081","doi":"10.1061/9780784485231.017","title":"Simulation-Based Approach for Master Planning and Scheduling in Offsite Construction Supply Chain Management","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Computer science; Supply chain management; Supply chain; Systems engineering; Operations management; Engineering; Business","score_opus":0.01586987261122653,"score_gpt":0.23001331381718054,"score_spread":0.21414344120595402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392456081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03250719,0.0002709412,0.96347827,0.000031146315,0.00023301772,0.00022511135,0.0000038027565,0.00020586078,0.0030446406],"genre_scores_gemma":[0.89060247,0.0000022413024,0.10914539,0.000018261393,0.000043132517,0.00005238905,0.000025242944,0.0000115962575,0.00009927745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959564,0.0000052480805,0.00013285046,0.00012689226,0.00004881688,0.00009056242],"domain_scores_gemma":[0.99986005,0.000060637933,0.0000061655737,0.000044743538,0.000010664976,0.000017710625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007203474,0.00007549498,0.00006263925,0.00019604615,0.000025515978,0.0000751872,0.000017693152,0.00004598328,0.000022304703],"category_scores_gemma":[0.000002999826,0.000072736264,0.000019462173,0.00012152826,0.000015253546,0.00011207878,0.0000037301756,0.00006291268,0.0000016852584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006460443,0.0000019974684,0.0019304564,0.00022361687,0.000012629423,6.6284935e-7,0.000077492325,0.93500614,0.00008102669,0.013441318,0.000010843589,0.049207345],"study_design_scores_gemma":[0.00023675807,0.000006132749,0.0003433791,0.00006903984,0.000008968183,0.0000015610057,0.00045380447,0.9972261,0.00022080656,0.00028568425,0.0010632935,0.00008445227],"about_ca_topic_score_codex":0.0000020630962,"about_ca_topic_score_gemma":0.0000018154657,"teacher_disagreement_score":0.8580953,"about_ca_system_score_codex":0.000031711657,"about_ca_system_score_gemma":0.0000042877487,"threshold_uncertainty_score":0.29660988},"labels":[],"label_agreement":null},{"id":"W4392578434","doi":"10.1016/j.jobe.2024.109022","title":"BIM-based automated fault detection and diagnostics of HVAC systems in commercial buildings","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Building information modeling; HVAC; Facility management; Analytics; Systems engineering; Computer science; Reuse; Information model; Engineering; Software engineering; Data science","score_opus":0.005377088752462981,"score_gpt":0.21211051348323856,"score_spread":0.20673342473077558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392578434","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82963717,0.0040245196,0.16400819,0.0000153765,0.0020219677,0.000047596655,0.00000330516,0.00022927158,0.000012596829],"genre_scores_gemma":[0.99694896,0.00018054391,0.0026795038,0.0000015387184,0.00016074353,0.0000029930206,3.6425044e-7,0.000024681423,6.5806285e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925196,0.000009878874,0.00042784723,0.00006225863,0.00013523537,0.00011281389],"domain_scores_gemma":[0.9996124,0.00018059212,0.000055628232,0.00004799272,0.000060074344,0.000043345837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022050277,0.000108125045,0.00020205266,0.000575338,0.0000132351215,0.000061658386,0.000055634486,0.000088534965,0.0000017038169],"category_scores_gemma":[0.000099635225,0.0001051465,0.000049829057,0.00033172185,0.000011907361,0.00018612872,0.0000062618433,0.0002768865,2.626152e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067111496,0.000006359559,0.00038362114,0.0005304556,0.000042516112,0.000020657992,0.000099591445,0.84924495,0.13176282,0.0011391658,0.000086926826,0.01667621],"study_design_scores_gemma":[0.00021464875,0.000037499252,0.0020633973,0.0010549737,0.000025928466,0.00013349326,0.000036011763,0.9695487,0.025613882,0.00002427369,0.001145175,0.00010201428],"about_ca_topic_score_codex":0.00001439812,"about_ca_topic_score_gemma":0.0000048745997,"teacher_disagreement_score":0.1673118,"about_ca_system_score_codex":0.00010961551,"about_ca_system_score_gemma":0.000018122224,"threshold_uncertainty_score":0.428775},"labels":[],"label_agreement":null},{"id":"W4392665696","doi":"10.14359/51740669","title":"SP-361: Concrete and Cement-Based Composites for Sustainable Built Environments","year":2024,"lang":"en","type":"paratext","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cement; Composite material; Materials science","score_opus":0.007510183215591169,"score_gpt":0.21546655996875275,"score_spread":0.2079563767531616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392665696","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005272196,0.020108985,0.35613948,0.00035629643,0.0054859677,0.0026010305,0.0005061708,0.00055698503,0.6089729],"genre_scores_gemma":[0.069862835,0.00054105633,0.0033444318,0.00018750309,0.000416416,0.00044017052,0.0013483247,0.00013096743,0.9237283],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992533,0.000007827209,0.00019740406,0.0002222181,0.00009281149,0.00022644943],"domain_scores_gemma":[0.9997322,0.0000383783,0.000024422527,0.000129806,0.000021082202,0.00005411035],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004302886,0.00023524647,0.00021238648,0.000115701,0.000064406304,0.00015151122,0.00006669347,0.00020906584,0.0015706798],"category_scores_gemma":[0.0000024420574,0.00021917802,0.00006563215,0.000050997394,0.000045685272,0.000073534524,0.000020641994,0.00016210694,0.00059985335],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022600312,0.0000031684149,0.000011800975,0.001999957,0.00024631663,0.0000042430356,0.000037851496,0.003266731,0.006934263,0.012278555,0.97259384,0.0026006426],"study_design_scores_gemma":[0.0003210397,0.00004972227,0.000002569373,0.000065323526,0.00007266486,0.0000028454951,0.00015151493,0.028867902,0.015149146,0.0001506429,0.9549038,0.00026282092],"about_ca_topic_score_codex":0.000027492179,"about_ca_topic_score_gemma":0.000003072909,"teacher_disagreement_score":0.35279506,"about_ca_system_score_codex":0.0001105598,"about_ca_system_score_gemma":0.000026777681,"threshold_uncertainty_score":0.999342},"labels":[],"label_agreement":null},{"id":"W4392734748","doi":"10.1108/sasbe-12-2023-0379","title":"An advanced exploration of functionalities as the underlying principles of construction control metrics","year":2024,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Keele University; Agence Nationale de la Recherche","keywords":"Computer science; Control (management); Workflow; Context (archaeology); Process management; Lagging; Quality (philosophy); Process (computing); Sensemaking; Project management; Engineering management; Systems engineering; Knowledge management; Engineering; Artificial intelligence","score_opus":0.01809620566078199,"score_gpt":0.2246221243085475,"score_spread":0.2065259186477655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392734748","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7718414,0.0055602756,0.21825224,0.00024413104,0.00044961603,0.0004087526,0.0000120374325,0.000106624575,0.0031249088],"genre_scores_gemma":[0.99831736,0.000543617,0.0004300164,0.0000073737197,0.000026167472,0.00004452551,0.000009622676,0.0000099809995,0.00061133184],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994067,0.000028160579,0.00020645642,0.00010249408,0.00014415217,0.000112030364],"domain_scores_gemma":[0.99974567,0.000054280135,0.000032200845,0.00011602408,0.000027593289,0.000024243087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018841564,0.00008432849,0.00009952649,0.00010728135,0.000083036,0.000032519987,0.00003770628,0.00004519233,0.000059458052],"category_scores_gemma":[0.000011399427,0.00006595438,0.000031385272,0.000116317904,0.00012827675,0.00044431924,0.000010133624,0.000070890186,0.000001981888],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048673646,0.000023976108,0.0027264855,0.0005181989,0.00012918175,0.0000024395263,0.0014465018,0.11923136,0.006152446,0.78146565,0.000025383606,0.08822971],"study_design_scores_gemma":[0.0020125592,0.001026412,0.017977733,0.0002012104,0.00043378345,0.0000912028,0.19472225,0.3197867,0.04047252,0.13785231,0.2845748,0.0008485379],"about_ca_topic_score_codex":0.00003828028,"about_ca_topic_score_gemma":0.000004273801,"teacher_disagreement_score":0.64361334,"about_ca_system_score_codex":0.000072128394,"about_ca_system_score_gemma":0.000024614108,"threshold_uncertainty_score":0.26895416},"labels":[],"label_agreement":null},{"id":"W4392775857","doi":"10.1007/978-981-97-1514-5","title":"Proceedings of the 2nd International Conference on Advanced Civil Engineering and Smart Structures","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mahasarakham University; Trakya Üniversitesi; Shandong Jianzhu University; Bauhaus-Universität Weimar; Beijing Technology and Business University; Universidade Federal do Rio Grande do Sul; Shandong University; Atatürk Üniversitesi; Universidad de Cádiz; Universiti Teknologi Malaysia; Zhejiang University; Iowa State University; King Mongkut's University of Technology Thonburi; University of Thessaly; Zhengzhou University; Università di Catania; Central South University; Saint Petersburg State University; Politechnika Bialostocka; Beijing University of Technology; Université de Sherbrooke; Central Queensland University; Đại học Đà Nẵng; Education University of Hong Kong; Wojskowa Akademia Techniczna; Politecnico di Torino; Università Degli Studi di Modena e Reggio Emila; University of Canterbury; City University of Hong Kong; Indian National Science Academy; Universitatea Tehnică „Gheorghe Asachi” din Iaşi; Auckland University of Technology, New Zealand","keywords":"Engineering; Engineering ethics; Political science; Engineering management; Library science; Computer science","score_opus":0.005953892740402382,"score_gpt":0.19366350843693622,"score_spread":0.18770961569653383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392775857","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06560136,0.026347507,0.08305105,0.0018384538,0.05584592,0.0045982613,0.0008327152,0.005285118,0.7565996],"genre_scores_gemma":[0.99682087,0.00027924395,0.0007944206,0.000024159752,0.0004099675,0.000046826237,0.000018855993,0.00013607593,0.0014695846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987409,0.0000023010416,0.00038777496,0.0003318807,0.0002965504,0.00024057676],"domain_scores_gemma":[0.9995577,0.00008988793,0.00006598646,0.00015959084,0.00007871507,0.000048155096],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000071376024,0.00045442782,0.00035795732,0.0003893482,0.000021553222,0.000089226705,0.0002827662,0.0004028408,0.00010331137],"category_scores_gemma":[0.000102102626,0.000382978,0.00010674925,0.00020445444,0.00004277659,0.00010791861,0.00007279853,0.0011750294,0.0000023296836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020562924,0.000008615545,0.00010315487,0.002396369,0.00030888672,0.000007209565,0.0008788501,0.8547499,0.028294118,0.09390703,0.0011146183,0.018210689],"study_design_scores_gemma":[0.0008217937,0.00009889874,0.00094429986,0.0087017175,0.00015977374,0.00016445696,0.000030362982,0.85943025,0.025429789,0.031409267,0.071027696,0.0017817004],"about_ca_topic_score_codex":0.0000034177772,"about_ca_topic_score_gemma":0.00019332109,"teacher_disagreement_score":0.9312195,"about_ca_system_score_codex":0.0002515652,"about_ca_system_score_gemma":0.000045789042,"threshold_uncertainty_score":0.9998622},"labels":[],"label_agreement":null},{"id":"W4392869766","doi":"10.2139/ssrn.4760275","title":"Multi-Objective Optimization of Cement-Based Systems Containing Marine Dredged Sediment","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Cement; Sediment; Environmental science; Geotechnical engineering; Geology; Geomorphology; Materials science; Composite material","score_opus":0.008002816271353439,"score_gpt":0.21987576973649298,"score_spread":0.21187295346513954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392869766","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020892443,0.009032523,0.9625013,0.00006854651,0.0049820077,0.0005558728,0.000029880493,0.00028046896,0.0016569946],"genre_scores_gemma":[0.9960429,0.0012247188,0.0019774714,0.0000059263816,0.00032808175,0.000058423866,0.00007871041,0.00006326477,0.0002204664],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99802196,0.0000742652,0.0006000444,0.00022447207,0.00027347615,0.0008058098],"domain_scores_gemma":[0.9992841,0.000023605911,0.00023144412,0.00017450233,0.00022974354,0.000056627698],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0007058209,0.00028318603,0.000345935,0.00034288346,0.00006665432,0.00010477788,0.00016697377,0.0002482422,0.00004117617],"category_scores_gemma":[0.000015801237,0.00027573467,0.00017233021,0.0001465475,0.000029640474,0.000054855027,0.00008464311,0.0030279201,0.0000067357887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003825221,0.000023166464,0.000098865545,0.00023454029,0.0006694527,0.0000017888542,0.00018068873,0.9829517,0.00052203063,0.008448717,0.000022038332,0.006808773],"study_design_scores_gemma":[0.0008200792,0.00017318412,0.000028257082,0.00044145543,0.00021693562,0.00008541094,0.0019473787,0.9894726,0.0009981148,0.0054574767,0.000067208515,0.00029184402],"about_ca_topic_score_codex":0.00014747455,"about_ca_topic_score_gemma":0.00018913206,"teacher_disagreement_score":0.97515047,"about_ca_system_score_codex":0.0023252787,"about_ca_system_score_gemma":0.0016176794,"threshold_uncertainty_score":0.9999695},"labels":[],"label_agreement":null},{"id":"W4392896973","doi":"10.1061/9780784485286.055","title":"Short-Term Planning of Municipal Infrastructure Maintenance Operations: Problem Statement and Optimization Formulation","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Computer science; Term (time); Operations research; Problem statement; Frame (networking); Job shop scheduling; Operations management; Management science; Schedule; Engineering","score_opus":0.010102853698857165,"score_gpt":0.24392913627790902,"score_spread":0.23382628257905186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392896973","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18966831,0.00038903666,0.8062196,0.00003544922,0.00022133869,0.00019324991,0.000010128067,0.00021546512,0.003047425],"genre_scores_gemma":[0.9673698,0.000100195546,0.03232599,0.0000054066663,0.000024832652,0.00002004753,0.000044900546,0.00001046986,0.00009835182],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995516,0.000005763462,0.00021781321,0.00008489977,0.000067718756,0.00007220176],"domain_scores_gemma":[0.99987006,0.000008452982,0.000007133747,0.000057199646,0.000037825983,0.000019348516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000049294726,0.00007350662,0.00006437952,0.000082702005,0.000032276403,0.000062542975,0.000025160953,0.000045206987,0.00006963211],"category_scores_gemma":[0.0000025107038,0.00006133473,0.00001398046,0.00010311474,0.000013843291,0.00033820534,0.000008322952,0.00006704163,7.3040655e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002188834,0.0000013702947,0.0004961216,0.000087773326,0.000018491564,3.8695865e-7,0.0007000967,0.96226203,0.0012686804,0.01743231,0.00023075033,0.0174998],"study_design_scores_gemma":[0.00006460843,0.000015300171,0.0011321675,0.000112388414,0.000010084298,0.000009285888,0.00028122799,0.99648833,0.0009300183,0.00039495833,0.00049087714,0.000070749134],"about_ca_topic_score_codex":0.000006174634,"about_ca_topic_score_gemma":0.000012646955,"teacher_disagreement_score":0.7777015,"about_ca_system_score_codex":0.000036617115,"about_ca_system_score_gemma":0.000009255783,"threshold_uncertainty_score":0.25011578},"labels":[],"label_agreement":null},{"id":"W4392897016","doi":"10.1061/9780784485286.011","title":"Results of a Groundbreaking Integrated Delivery Project: Multi-Stakeholder Assessments and Lessons Learned from the Waaban Crossing Bridge","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Kingston Health Sciences Centre","funders":"","keywords":"Project sponsorship; Project stakeholder; Integrated project delivery; Project team; Stakeholder; Bridge (graph theory); Project charter; Transparency (behavior); Business; Project management triangle; Project management; Stakeholder engagement; Project planning; Basis of estimate; Project manager; Process management; Public relations; Knowledge management; Engineering; Computer science; Political science; Computer security; Medicine","score_opus":0.15134616525734423,"score_gpt":0.33580129356703375,"score_spread":0.18445512830968952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392897016","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9163432,0.00088435033,0.077884525,0.00029437974,0.0006525948,0.0002001224,0.00021773673,0.00047444465,0.0030486237],"genre_scores_gemma":[0.99704254,0.00007904658,0.0023933235,0.000021501297,0.00005207485,0.000011259142,0.000054639517,0.000020969097,0.00032465195],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992705,0.00003403366,0.00025552957,0.00020096712,0.000112099166,0.00012689238],"domain_scores_gemma":[0.99963045,0.00012504561,0.000026757465,0.00014269254,0.000054141467,0.000020900881],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001370342,0.00012854366,0.00011552341,0.000069613925,0.000113533424,0.00044480248,0.00007448925,0.000077515484,0.00002023349],"category_scores_gemma":[0.000021954107,0.000085812004,0.000039653947,0.0002440735,0.00009975953,0.0002697384,0.000022233353,0.00023028009,0.0000038994385],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057760448,0.000031095762,0.0009263657,0.000086217064,0.00028107435,0.000010534045,0.004676768,0.00030064496,0.04806493,0.004822342,0.0029341828,0.9378081],"study_design_scores_gemma":[0.0018251209,0.0000623564,0.043183934,0.001082695,0.00015142448,0.00005302004,0.0073918393,0.9024447,0.015832875,0.00088687387,0.026526637,0.00055849546],"about_ca_topic_score_codex":0.0045085684,"about_ca_topic_score_gemma":0.0013086407,"teacher_disagreement_score":0.9372496,"about_ca_system_score_codex":0.000048752892,"about_ca_system_score_gemma":0.00006934142,"threshold_uncertainty_score":0.6815637},"labels":[],"label_agreement":null},{"id":"W4392919890","doi":"10.1061/9780784485262.122","title":"Prioritizing and Work Packaging of Multi-Facility Rehabilitation Using Text Mining","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Work (physics); Computer science; Engineering; Mechanical engineering","score_opus":0.016353685715238743,"score_gpt":0.24260724700156341,"score_spread":0.22625356128632468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392919890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92875504,0.00091576966,0.069137014,0.000027224285,0.00031592642,0.000057068548,0.0000029411883,0.00021004726,0.0005789841],"genre_scores_gemma":[0.9563986,0.000007974642,0.043529175,0.0000023504053,0.000019276102,0.000002344939,0.0000012777701,0.0000060312846,0.000032954376],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996124,0.00001137689,0.00015776441,0.00009725848,0.00005194205,0.0000692606],"domain_scores_gemma":[0.9997992,0.0000899809,0.000007953351,0.00005833139,0.000025249754,0.00001929952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011192273,0.000059698294,0.00007053448,0.000077811805,0.000026529266,0.000038352784,0.000015160563,0.000038518305,0.000020328895],"category_scores_gemma":[0.000029048295,0.00005733012,0.000023644745,0.00017766468,0.0000343186,0.00017002101,0.0000067215897,0.000061867824,0.0000024926164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007164704,0.000010228203,0.059707355,0.00095088116,0.000058260106,0.0000019064908,0.006278236,0.0030025973,0.10311748,0.0043828995,0.00015626028,0.8223267],"study_design_scores_gemma":[0.0002653786,0.000028972929,0.03531732,0.00077359646,0.000041835312,0.000027412781,0.0055388142,0.94938123,0.0063732914,0.00045744015,0.0014813995,0.0003133321],"about_ca_topic_score_codex":0.000013181913,"about_ca_topic_score_gemma":0.000007995565,"teacher_disagreement_score":0.9463786,"about_ca_system_score_codex":0.000033074586,"about_ca_system_score_gemma":0.000008556348,"threshold_uncertainty_score":0.23378544},"labels":[],"label_agreement":null},{"id":"W4392941266","doi":"10.1109/apscon60364.2024.10465871","title":"ConstructNet: A Deep Learning Object Detector for Construction Site Surveillance","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Detector; Artificial intelligence; Object detection; Object (grammar); Deep learning; Computer vision; Pattern recognition (psychology); Telecommunications","score_opus":0.005016710404377465,"score_gpt":0.20131197939547835,"score_spread":0.1962952689911009,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392941266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19102682,0.00182791,0.7835615,0.00004960042,0.0039161476,0.00033367498,0.00002729536,0.0027838093,0.016473226],"genre_scores_gemma":[0.99060464,0.00006519421,0.008652175,0.000010735435,0.00023199739,0.000056171953,0.000022342514,0.000030973646,0.00032576802],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993702,0.000015874642,0.00018525268,0.00017662665,0.00007778543,0.00017425601],"domain_scores_gemma":[0.99970806,0.000104006984,0.000013332254,0.000078923564,0.000053764415,0.00004192415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008613654,0.00013015626,0.00011894218,0.00011523488,0.00007809046,0.00012686923,0.000038502953,0.00009220975,0.0003341155],"category_scores_gemma":[0.000025636902,0.00012206156,0.00006712685,0.00020173768,0.00005792056,0.00015442785,0.000005282062,0.00016164954,0.0000822144],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013681634,0.0000018220937,0.0021837505,0.0002193548,0.00008510723,0.0000021825676,0.00019381952,0.0041496255,0.03949746,0.029373653,0.0005563062,0.9237232],"study_design_scores_gemma":[0.00046791593,0.00010160994,0.0009930708,0.00006956893,0.00003224438,0.0004029192,0.000556922,0.81732625,0.04306489,0.0027604983,0.13367309,0.0005510611],"about_ca_topic_score_codex":0.000009425533,"about_ca_topic_score_gemma":0.00011114852,"teacher_disagreement_score":0.9231722,"about_ca_system_score_codex":0.000057062418,"about_ca_system_score_gemma":0.00001898338,"threshold_uncertainty_score":0.4977526},"labels":[],"label_agreement":null},{"id":"W4393144079","doi":"10.1007/978-3-031-47504-7_14","title":"Robust Cuts in Bricks","year":2024,"lang":"en","type":"book-chapter","venue":"Algorithms and computation in mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science","score_opus":0.020292482528453032,"score_gpt":0.22150656287556925,"score_spread":0.20121408034711621,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393144079","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00049901113,0.0034297945,0.1584985,0.00007247857,0.0012759038,0.00040024245,0.00002801853,0.00032318864,0.8354729],"genre_scores_gemma":[0.04598159,0.006423359,0.2634621,0.00015914129,0.0013716301,0.00022269906,0.00042391894,0.00077406043,0.6811815],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992364,0.0000025360157,0.00038617782,0.00015544106,0.00012150077,0.00009794227],"domain_scores_gemma":[0.999786,0.00004662353,0.00004108635,0.00007144975,0.000027946615,0.000026896183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000075144126,0.00018951563,0.00023100346,0.00028838892,0.000014267406,0.000066379595,0.00004317234,0.00020135935,0.000052137442],"category_scores_gemma":[0.0000023478221,0.00019433751,0.000036524547,0.00006454808,0.000028830898,0.00005878669,0.000016567401,0.0003135858,0.000060013754],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016756668,0.000023717332,0.000013664258,0.0012893727,0.00007560581,0.00005863325,0.002196118,0.094421156,0.000004439913,0.6644052,0.0016463416,0.23586403],"study_design_scores_gemma":[0.00010619826,0.000008836636,0.000016099566,0.00047242764,0.000014126513,0.00003519307,0.00009662707,0.67537916,0.0000021111157,0.32048887,0.0032033662,0.00017698885],"about_ca_topic_score_codex":0.0000056683984,"about_ca_topic_score_gemma":0.00003421102,"teacher_disagreement_score":0.580958,"about_ca_system_score_codex":0.00006671897,"about_ca_system_score_gemma":0.000012624701,"threshold_uncertainty_score":0.7924854},"labels":[],"label_agreement":null},{"id":"W4393195174","doi":"10.1007/s44290-024-00002-0","title":"Unveiling a new horizon in civil engineering","year":2024,"lang":"en","type":"article","venue":"Discover Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Horizon; Mathematical economics; Economics; Mathematics; Geometry","score_opus":0.005152618983079885,"score_gpt":0.1863034706965655,"score_spread":0.1811508517134856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393195174","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22984119,0.016454002,0.72294474,0.00014753734,0.009560078,0.00041672314,0.000030285519,0.0047341096,0.015871357],"genre_scores_gemma":[0.99818295,0.00014171365,0.000655335,0.000007328647,0.0005352574,0.000035186345,0.000016387596,0.00010958549,0.00031625273],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987377,0.0000048749343,0.0003445626,0.0002935628,0.00019405689,0.00042527178],"domain_scores_gemma":[0.9995891,0.000057719677,0.000010403346,0.00020740437,0.000011650091,0.00012371215],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010436581,0.0003133152,0.00022831128,0.0004794668,0.000019269602,0.00021042088,0.0001391952,0.00013939895,0.00023398589],"category_scores_gemma":[0.000031021038,0.0003385866,0.00011560275,0.0007411885,0.000008326964,0.00060800486,0.000026338752,0.00047797032,0.0001072974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026799087,0.0000064548317,0.0001608728,0.00034768236,0.00006179338,0.0000413829,0.00042811088,0.95573604,0.01815495,0.013283859,0.001568888,0.010207259],"study_design_scores_gemma":[0.00022915112,0.000020829959,0.00068103964,0.0006348258,0.00001899519,0.000039551687,0.000052458847,0.9521719,0.0035919698,0.00016411237,0.041908413,0.00048670155],"about_ca_topic_score_codex":0.00004859718,"about_ca_topic_score_gemma":0.00042232368,"teacher_disagreement_score":0.7683418,"about_ca_system_score_codex":0.00023405423,"about_ca_system_score_gemma":0.000057951638,"threshold_uncertainty_score":0.9999066},"labels":[],"label_agreement":null},{"id":"W4393217421","doi":"10.3390/buildings14040918","title":"The Assessment of the Maturity of Informatization in Assembly-Building Projects Utilizing the CMM-CME Methodology, Taking a Project in China as an Illustration","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Informatization; China; Maturity (psychological); Engineering; Engineering management; Manufacturing engineering; Capability Maturity Model; Construction engineering; Systems engineering; Architectural engineering; Computer science; Political science; Telecommunications","score_opus":0.04127413801616046,"score_gpt":0.33437739654728793,"score_spread":0.29310325853112745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393217421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9832178,0.00017885458,0.0121493805,0.00019308842,0.0005195463,0.0006239347,0.0000028723205,0.000077133634,0.003037419],"genre_scores_gemma":[0.9951143,0.000057477275,0.0046844967,0.000012127272,0.000037002457,0.00006984888,0.0000028417683,0.000013683473,0.000008207983],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987966,0.00020947876,0.0004847062,0.00012744118,0.00021498953,0.00016679775],"domain_scores_gemma":[0.9993866,0.00020564541,0.00015240992,0.00019818,0.000046801368,0.000010383397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016469123,0.00012371692,0.00014586332,0.00019669603,0.000093888055,0.000108623404,0.00023193019,0.000108442255,0.000003973261],"category_scores_gemma":[0.00019986324,0.000070125265,0.000056520377,0.00089658296,0.00007800837,0.0004939262,0.000042374963,0.00040043928,2.1412943e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024887253,0.000031996457,0.010888967,0.0006122481,0.000060563998,0.0000011075941,0.015881432,0.02077384,0.13097619,0.72314847,0.00013293502,0.097467355],"study_design_scores_gemma":[0.0003398822,0.00007956911,0.10358156,0.0010377022,0.00004043103,0.000058960104,0.010231564,0.8003059,0.07456279,0.007894956,0.0016131428,0.0002535402],"about_ca_topic_score_codex":0.0005414838,"about_ca_topic_score_gemma":0.00058402255,"teacher_disagreement_score":0.7795321,"about_ca_system_score_codex":0.00013642998,"about_ca_system_score_gemma":0.00014641645,"threshold_uncertainty_score":0.28596252},"labels":[],"label_agreement":null},{"id":"W4393220625","doi":"10.1016/j.autcon.2024.105389","title":"Vision-based real-time process monitoring and problem feedback for productivity-oriented analysis in off-site construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Postdoctoral Science Foundation","keywords":"Productivity; Process (computing); Computer science; Engineering; Industrial engineering; Real-time computing; Economics; Operating system","score_opus":0.004545355074329525,"score_gpt":0.2406561567034245,"score_spread":0.23611080162909498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393220625","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96647084,0.00018397984,0.02997054,0.00015572297,0.0011198336,0.0007316904,0.000033936256,0.00083916896,0.00049426133],"genre_scores_gemma":[0.98036075,0.00006246725,0.018977104,0.0000017897587,0.00013916237,0.0003035194,0.00009982787,0.000030185227,0.000025217141],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984873,0.000058550562,0.0005735277,0.00045014505,0.00020434448,0.00022616227],"domain_scores_gemma":[0.9994414,0.000116225885,0.000085628715,0.00015939423,0.0001486678,0.000048672377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034499337,0.00022025034,0.00028438587,0.0014072855,0.000088639936,0.00016116066,0.000046318462,0.00018374999,0.000032723194],"category_scores_gemma":[0.00003970922,0.00024082072,0.00007673167,0.0022273269,0.00012038994,0.00088371907,0.000007189215,0.00020324651,0.000009151924],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000101542915,0.000057115612,0.14378662,0.0013665246,0.000271739,0.000003790303,0.0014563487,0.13540657,0.027998671,0.0071229124,0.00006464879,0.6823635],"study_design_scores_gemma":[0.00065063307,0.000043451,0.03471483,0.0003810248,0.00014020302,0.000039676124,0.00044531462,0.95201176,0.008974593,0.002045528,0.000241382,0.00031157667],"about_ca_topic_score_codex":0.000050448543,"about_ca_topic_score_gemma":0.000075696145,"teacher_disagreement_score":0.8166052,"about_ca_system_score_codex":0.00027647024,"about_ca_system_score_gemma":0.000079165744,"threshold_uncertainty_score":0.98203844},"labels":[],"label_agreement":null},{"id":"W4393373757","doi":"10.46299/isg.2024.1.13","title":"Proceedings of the XIII International Scientific and Practical Conference","year":2024,"lang":"en","type":"paratext","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Baki Dövlət Universiteti; Xidian University; Sumy State University; Kungliga Tekniska Högskolan; University of Miami; York University; Ohio State University; Lviv Polytechnic National University; Arizona State University; DePaul University; Southern Methodist University; Tianjin University; Carnegie Mellon University; Northwestern University; University of Southern California","keywords":"Computer science; Library science; Engineering ethics; Engineering","score_opus":0.017564915033718136,"score_gpt":0.25622394013054967,"score_spread":0.23865902509683154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393373757","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007853908,0.0002240806,0.00053957145,0.00068356504,0.012181795,0.00010338011,0.000042114665,0.000048501766,0.9783231],"genre_scores_gemma":[0.56892246,0.00011921218,0.0004545687,0.000016267082,0.00022343372,0.000017247621,0.000016886484,0.000016014996,0.43021387],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99954784,0.0000014151661,0.00012882214,0.00012218194,0.00014722382,0.000052499687],"domain_scores_gemma":[0.99975365,0.000009484701,0.00002615739,0.000042904725,0.00015141784,0.000016386404],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000049466038,0.000080014295,0.00007446957,0.00006840632,0.000026723053,0.00024815067,0.00007101508,0.00010428086,0.00208005],"category_scores_gemma":[0.000012187869,0.000051406703,0.000029292958,0.00009874699,0.0001358551,0.00009992046,0.00003979187,0.0002371511,0.00033863846],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014526665,0.0000031381157,0.000009578565,0.00015376719,0.000044274086,9.345752e-8,0.00008755305,0.000006227056,0.004832125,0.11041508,0.8825347,0.0019120417],"study_design_scores_gemma":[0.00005277462,0.0000057525244,0.00004309961,0.00022750777,0.000029753142,0.0000677883,0.00021077864,0.009005538,0.015132927,0.0013284045,0.9737747,0.00012100235],"about_ca_topic_score_codex":0.000002796062,"about_ca_topic_score_gemma":0.0000041153626,"teacher_disagreement_score":0.5610686,"about_ca_system_score_codex":0.00002050553,"about_ca_system_score_gemma":0.000048487604,"threshold_uncertainty_score":0.99883217},"labels":[],"label_agreement":null},{"id":"W4393446281","doi":"10.5281/zenodo.4742845","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393446281","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W4393496068","doi":"10.5281/zenodo.5589803","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Construction engineering; Data science; Engineering","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393496068","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W4393609568","doi":"10.5281/zenodo.6048353","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393609568","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003891011,0.00007297286,0.076239645,0.00006498353,0.00116456,0.0012254581,0.9169132,0.0014092961,0.0025207503],"genre_scores_gemma":[0.005718383,0.00012341325,0.001290683,0.000016970009,0.00021826365,0.000001828397,0.99174875,0.0008583445,0.0000233823],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775964,0.00032571107,0.00057380035,0.0005624745,0.00040278572,0.00037556255],"domain_scores_gemma":[0.998771,0.00008318508,0.00022996632,0.0005873665,0.00021309112,0.000115394796],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00069372327,0.00028487906,0.00027864904,0.00094547315,0.0017631049,0.0008970592,0.00057328556,0.00022639325,0.0062021813],"category_scores_gemma":[0.00031029189,0.000357838,0.00008380186,0.0007913184,0.00018316791,0.00052622403,0.00029226104,0.00072693825,0.00012930098],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008154335,0.000024684034,0.0000010931709,0.00058554695,0.000056992307,0.000004529387,0.00007226107,0.00083206483,0.0008097845,0.035815667,0.9512891,0.010426721],"study_design_scores_gemma":[0.000582125,0.000066042914,0.000008555608,0.00017093794,0.00005350047,0.00041560933,0.0037084457,0.0055812798,0.000052768923,0.00015769381,0.98887336,0.00032965656],"about_ca_topic_score_codex":0.000041968364,"about_ca_topic_score_gemma":0.0000048316797,"teacher_disagreement_score":0.07494897,"about_ca_system_score_codex":0.002159387,"about_ca_system_score_gemma":0.000010404387,"threshold_uncertainty_score":0.99988735},"labels":[],"label_agreement":null},{"id":"W4393640286","doi":"10.5281/zenodo.6110275","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Construction engineering; Data science; Engineering","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393640286","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003891011,0.00007297286,0.076239645,0.00006498353,0.00116456,0.0012254581,0.9169132,0.0014092961,0.0025207503],"genre_scores_gemma":[0.005718383,0.00012341325,0.001290683,0.000016970009,0.00021826365,0.000001828397,0.99174875,0.0008583445,0.0000233823],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775964,0.00032571107,0.00057380035,0.0005624745,0.00040278572,0.00037556255],"domain_scores_gemma":[0.998771,0.00008318508,0.00022996632,0.0005873665,0.00021309112,0.000115394796],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00069372327,0.00028487906,0.00027864904,0.00094547315,0.0017631049,0.0008970592,0.00057328556,0.00022639325,0.0062021813],"category_scores_gemma":[0.00031029189,0.000357838,0.00008380186,0.0007913184,0.00018316791,0.00052622403,0.00029226104,0.00072693825,0.00012930098],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008154335,0.000024684034,0.0000010931709,0.00058554695,0.000056992307,0.000004529387,0.00007226107,0.00083206483,0.0008097845,0.035815667,0.9512891,0.010426721],"study_design_scores_gemma":[0.000582125,0.000066042914,0.000008555608,0.00017093794,0.00005350047,0.00041560933,0.0037084457,0.0055812798,0.000052768923,0.00015769381,0.98887336,0.00032965656],"about_ca_topic_score_codex":0.000041968364,"about_ca_topic_score_gemma":0.0000048316797,"teacher_disagreement_score":0.07494897,"about_ca_system_score_codex":0.002159387,"about_ca_system_score_gemma":0.000010404387,"threshold_uncertainty_score":0.99988735},"labels":[],"label_agreement":null},{"id":"W4393646936","doi":"10.5281/zenodo.4775963","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Data science","score_opus":0.1093999890298455,"score_gpt":0.2569136690517907,"score_spread":0.1475136800219452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393646936","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000063299562,0.000058658803,0.0032980917,0.000016378852,0.0006810466,0.0007092413,0.99474263,0.0003826533,0.00010497977],"genre_scores_gemma":[0.00082770456,0.000012222988,0.0017797025,0.000019630763,0.00040055346,0.00054655224,0.9963642,0.000046753743,0.0000026807404],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99851286,0.00005312092,0.0005269748,0.00043923268,0.00021237736,0.0002554093],"domain_scores_gemma":[0.99904853,0.00020382104,0.00022220705,0.00035215507,0.00007821318,0.00009504807],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00006234196,0.0003297827,0.0003309696,0.00039107775,0.00012834206,0.00024038382,0.00018492782,0.00046547106,0.0015776712],"category_scores_gemma":[0.0003976562,0.0003876804,0.00010150653,0.00039926672,0.00002209862,0.0004472214,0.000036089965,0.0005294138,0.0001876917],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022506354,0.0000034198033,0.00000292473,0.002045739,0.000031548774,0.000003715375,0.000010171604,0.0002758275,0.00009351398,0.0019868265,0.99473554,0.0007882802],"study_design_scores_gemma":[0.00041165104,0.000017338887,0.000009319679,0.0044015055,0.000049774106,0.00010666604,0.0011846921,0.018971693,0.00012665759,0.000059240087,0.974261,0.00040048757],"about_ca_topic_score_codex":0.000015996198,"about_ca_topic_score_gemma":0.0000744256,"teacher_disagreement_score":0.020474551,"about_ca_system_score_codex":0.0010062407,"about_ca_system_score_gemma":0.000079240584,"threshold_uncertainty_score":0.9998575},"labels":[],"label_agreement":null},{"id":"W4393668943","doi":"10.5281/zenodo.5586016","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Construction engineering; Engineering","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393668943","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W4393723798","doi":"10.5281/zenodo.5576147","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393723798","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W4393772064","doi":"10.5281/zenodo.5607822","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Database; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393772064","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W4393822399","doi":"10.5281/zenodo.4360526","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393822399","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003891011,0.00007297286,0.076239645,0.00006498353,0.00116456,0.0012254581,0.9169132,0.0014092961,0.0025207503],"genre_scores_gemma":[0.005718383,0.00012341325,0.001290683,0.000016970009,0.00021826365,0.000001828397,0.99174875,0.0008583445,0.0000233823],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775964,0.00032571107,0.00057380035,0.0005624745,0.00040278572,0.00037556255],"domain_scores_gemma":[0.998771,0.00008318508,0.00022996632,0.0005873665,0.00021309112,0.000115394796],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00069372327,0.00028487906,0.00027864904,0.00094547315,0.0017631049,0.0008970592,0.00057328556,0.00022639325,0.0062021813],"category_scores_gemma":[0.00031029189,0.000357838,0.00008380186,0.0007913184,0.00018316791,0.00052622403,0.00029226104,0.00072693825,0.00012930098],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008154335,0.000024684034,0.0000010931709,0.00058554695,0.000056992307,0.000004529387,0.00007226107,0.00083206483,0.0008097845,0.035815667,0.9512891,0.010426721],"study_design_scores_gemma":[0.000582125,0.000066042914,0.000008555608,0.00017093794,0.00005350047,0.00041560933,0.0037084457,0.0055812798,0.000052768923,0.00015769381,0.98887336,0.00032965656],"about_ca_topic_score_codex":0.000041968364,"about_ca_topic_score_gemma":0.0000048316797,"teacher_disagreement_score":0.07494897,"about_ca_system_score_codex":0.002159387,"about_ca_system_score_gemma":0.000010404387,"threshold_uncertainty_score":0.99988735},"labels":[],"label_agreement":null},{"id":"W4393889390","doi":"10.5281/zenodo.7850125","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Information retrieval","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393889390","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003891011,0.00007297286,0.076239645,0.00006498353,0.00116456,0.0012254581,0.9169132,0.0014092961,0.0025207503],"genre_scores_gemma":[0.005718383,0.00012341325,0.001290683,0.000016970009,0.00021826365,0.000001828397,0.99174875,0.0008583445,0.0000233823],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775964,0.00032571107,0.00057380035,0.0005624745,0.00040278572,0.00037556255],"domain_scores_gemma":[0.998771,0.00008318508,0.00022996632,0.0005873665,0.00021309112,0.000115394796],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00069372327,0.00028487906,0.00027864904,0.00094547315,0.0017631049,0.0008970592,0.00057328556,0.00022639325,0.0062021813],"category_scores_gemma":[0.00031029189,0.000357838,0.00008380186,0.0007913184,0.00018316791,0.00052622403,0.00029226104,0.00072693825,0.00012930098],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008154335,0.000024684034,0.0000010931709,0.00058554695,0.000056992307,0.000004529387,0.00007226107,0.00083206483,0.0008097845,0.035815667,0.9512891,0.010426721],"study_design_scores_gemma":[0.000582125,0.000066042914,0.000008555608,0.00017093794,0.00005350047,0.00041560933,0.0037084457,0.0055812798,0.000052768923,0.00015769381,0.98887336,0.00032965656],"about_ca_topic_score_codex":0.000041968364,"about_ca_topic_score_gemma":0.0000048316797,"teacher_disagreement_score":0.07494897,"about_ca_system_score_codex":0.002159387,"about_ca_system_score_gemma":0.000010404387,"threshold_uncertainty_score":0.99988735},"labels":[],"label_agreement":null},{"id":"W4393928628","doi":"10.1007/s41693-024-00117-x","title":"Integrating lean and robotics in the construction sector: a scientometric analysis","year":2024,"lang":"en","type":"article","venue":"Construction Robotics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robotics; Artificial intelligence; Manufacturing engineering; Engineering; Computer science; Robot","score_opus":0.014155584190876334,"score_gpt":0.23507196840438824,"score_spread":0.2209163842135119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393928628","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13579182,0.0028673895,0.8483014,0.0007112168,0.0054330234,0.00036850877,0.000026657557,0.0008388808,0.0056611123],"genre_scores_gemma":[0.9606119,0.00023230174,0.038875964,0.000028098691,0.00016782882,0.000012882772,0.000021697782,0.000019592851,0.000029744486],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877703,0.000050716873,0.00040132293,0.00027809234,0.0002619701,0.00023086458],"domain_scores_gemma":[0.9994637,0.0001532336,0.000041159576,0.00020710402,0.00007691273,0.000057906993],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003270891,0.00019937179,0.00021859452,0.0021095031,0.00014494645,0.00040882066,0.00012165753,0.0001387792,0.000044615146],"category_scores_gemma":[0.00005322394,0.0001601658,0.00010666816,0.007117232,0.00031674939,0.00030237588,0.0000179086,0.00045920766,0.000013090667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000034788268,0.000010759663,0.027764209,0.000117560296,0.00029267056,0.000009849273,0.0006948746,0.37697387,0.0004937571,0.4473914,0.00023492375,0.14601265],"study_design_scores_gemma":[0.00020887816,0.00003068886,0.00366321,0.000083536856,0.00049135915,0.0006807769,0.004024928,0.9825049,0.00017974092,0.0065386235,0.0012470548,0.00034628366],"about_ca_topic_score_codex":0.000020611371,"about_ca_topic_score_gemma":0.00013784812,"teacher_disagreement_score":0.82482004,"about_ca_system_score_codex":0.00013361823,"about_ca_system_score_gemma":0.000042632797,"threshold_uncertainty_score":0.6531372},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"}],"label_agreement":"agree"},{"id":"W4393966878","doi":"10.5281/zenodo.4360527","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393966878","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00018605456,0.00004377976,0.14779116,0.00010931592,0.0007837092,0.0010828379,0.846662,0.0014545855,0.0018865848],"genre_scores_gemma":[0.009661408,0.00011760274,0.002428741,0.000026346437,0.00036119414,9.3507106e-7,0.9865493,0.0008438018,0.000010676868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.997932,0.0002391679,0.00057620835,0.00056731905,0.00033448977,0.00035078338],"domain_scores_gemma":[0.9988244,0.00007095925,0.00021659178,0.00048217847,0.00025205308,0.00015382802],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043432965,0.00029556008,0.00029993465,0.0006666411,0.0010701745,0.0010201515,0.00051261217,0.00028549592,0.0004121237],"category_scores_gemma":[0.00040965225,0.0003591439,0.000081954146,0.00073289894,0.00019369945,0.00053602975,0.00020437918,0.000635032,0.00050242536],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008157784,0.000015840957,8.570385e-7,0.0007470308,0.000055749537,0.0000043583327,0.000071981696,0.00033262547,0.0013413269,0.029739391,0.9578656,0.009743681],"study_design_scores_gemma":[0.0005917491,0.000063009466,0.000008877985,0.00032054307,0.000057867263,0.0002786292,0.0023540487,0.009747408,0.00011620901,0.00015199961,0.9859807,0.00032896976],"about_ca_topic_score_codex":0.000023626853,"about_ca_topic_score_gemma":0.0000036004283,"teacher_disagreement_score":0.14536242,"about_ca_system_score_codex":0.0013231573,"about_ca_system_score_gemma":0.000009668096,"threshold_uncertainty_score":0.99988604},"labels":[],"label_agreement":null},{"id":"W4394571638","doi":"10.1061/ppscfx.sceng-1425","title":"Universal Structural Design Criteria for Heavy Industrial Projects","year":2024,"lang":"en","type":"article","venue":"Practice Periodical on Structural Design and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Communications Research Centre Canada","funders":"","keywords":"Construction engineering; Engineering; Civil engineering; Business; Forensic engineering","score_opus":0.053530357362322506,"score_gpt":0.2943517418558906,"score_spread":0.24082138449356807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394571638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19859976,0.0016639762,0.7787269,0.002344782,0.012735556,0.0026416427,0.000116436284,0.0019220787,0.001248891],"genre_scores_gemma":[0.90801954,0.00010591074,0.090545155,0.00013004697,0.0009393627,0.00010335264,0.00003464974,0.00005830565,0.000063672094],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99806976,0.000324901,0.00041507353,0.0005059128,0.00030395933,0.0003804136],"domain_scores_gemma":[0.99857354,0.0008653428,0.000071790695,0.00016700936,0.00013387899,0.00018842345],"candidate_categories":["metaepi_narrow","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.00042182996,0.000384474,0.0003015212,0.0002524395,0.00047886494,0.0011273974,0.00011393324,0.00036198684,0.00021605617],"category_scores_gemma":[0.00032596433,0.0003334325,0.00010713691,0.00033092525,0.0004045314,0.0013913609,0.00001889842,0.0006189893,0.000017207203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003801851,0.000010596012,0.000047298534,0.0002111379,0.00037594815,0.000043293367,0.0013933541,0.0021049692,0.009371648,0.09879903,0.005168772,0.8786721],"study_design_scores_gemma":[0.0027434172,0.0013852916,0.00024311274,0.0002738718,0.0004926425,0.0038699848,0.002670537,0.89217174,0.0123722665,0.0137863085,0.06864198,0.0013488218],"about_ca_topic_score_codex":0.000022428723,"about_ca_topic_score_gemma":0.0000014294702,"teacher_disagreement_score":0.8900668,"about_ca_system_score_codex":0.00018633965,"about_ca_system_score_gemma":0.00022533846,"threshold_uncertainty_score":0.9999118},"labels":[],"label_agreement":null},{"id":"W4394762557","doi":"10.3390/app14083244","title":"The Development of an Automated System for a Quality Evaluation of Engineering BIM Models: A Case Study","year":2024,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Building information modeling; Visualization; Computer science; Database; Systems engineering; Quality (philosophy); Software engineering; Engineering; Data mining; Operations management","score_opus":0.08244500862354975,"score_gpt":0.3419511979695829,"score_spread":0.25950618934603314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394762557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9666453,0.00011222736,0.031979263,0.0000014296933,0.00023076459,0.00039888706,0.0000023826683,0.00026272782,0.0003670118],"genre_scores_gemma":[0.9953388,2.3930266e-7,0.004436026,1.6726948e-7,0.0000100584075,0.00020960698,7.357857e-7,0.000003758003,5.9028696e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992884,0.000016542519,0.0002655552,0.0000967537,0.00026406176,0.00006867989],"domain_scores_gemma":[0.9997438,0.00007480889,0.000026079619,0.000071085364,0.00007066436,0.000013538554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021685234,0.000050674316,0.00006972285,0.00006512517,0.000106049774,0.000041874453,0.00007475106,0.000018434224,6.6045425e-7],"category_scores_gemma":[0.00000771709,0.000034182278,0.000013785249,0.0002709645,0.000031555646,0.000093738854,0.000005834104,0.000023526643,3.2665014e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000051270276,0.00002448845,0.000017397637,0.00032980673,0.000063532636,6.7329546e-7,0.01060745,0.7343172,0.015443892,0.11453162,0.0000045826814,0.12465427],"study_design_scores_gemma":[0.00008046047,0.000015497266,0.000048413243,0.00001944937,0.000016575532,0.000009592974,0.022935264,0.96792156,0.008644539,0.0002613248,0.000006283187,0.000041071464],"about_ca_topic_score_codex":0.00001838719,"about_ca_topic_score_gemma":0.00011852717,"teacher_disagreement_score":0.23360437,"about_ca_system_score_codex":0.00004631144,"about_ca_system_score_gemma":0.00009558708,"threshold_uncertainty_score":0.13939129},"labels":[],"label_agreement":null},{"id":"W4394770052","doi":"10.1016/j.inffus.2024.102423","title":"Artificial intelligence for production, operations and logistics management in modular construction industry: A systematic literature review","year":2024,"lang":"en","type":"article","venue":"Information Fusion","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Ministry of Education of the People's Republic of China; National Social Science Fund of China; National Natural Science Foundation of China; Hubei Provincial Department of Education","keywords":"Modular design; Computer science; Context (archaeology); Industry 4.0; Production (economics); Systematic review; Engineering management; Knowledge management; Management science; Engineering","score_opus":0.014744349078772314,"score_gpt":0.24467609475896554,"score_spread":0.22993174568019323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394770052","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004443157,0.019689947,0.96576905,0.0013585432,0.0032264479,0.0034277525,0.00005237576,0.00051965204,0.0015130842],"genre_scores_gemma":[0.91850126,0.051796988,0.026325006,0.0003627944,0.00036896858,0.0017760033,0.000607516,0.000034996512,0.00022644806],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991667,0.000017115053,0.00052744994,0.000093547394,0.00010902659,0.00008610975],"domain_scores_gemma":[0.9997208,0.000013232156,0.000025150915,0.00010618169,0.00010967609,0.0000249625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024802718,0.00010398605,0.00012218185,0.0002741057,0.00006930903,0.00019531028,0.000038955426,0.00012326363,0.000017243126],"category_scores_gemma":[0.000066193126,0.00009178552,0.000025040852,0.0004863841,0.000031225918,0.00087584433,0.000010482239,0.00018920693,0.000017406079],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001147501,0.000014484482,0.000017300968,0.20641299,0.000061368664,0.0000030428266,0.0024375771,0.091599114,0.00016604879,0.35728455,0.0022126846,0.33977938],"study_design_scores_gemma":[0.00005573009,0.00002983778,0.00003893057,0.054648038,0.000099344725,0.00019728349,0.0016882682,0.9311643,0.0005752314,0.006196726,0.0050318167,0.00027446036],"about_ca_topic_score_codex":9.3995214e-7,"about_ca_topic_score_gemma":0.0000070289643,"teacher_disagreement_score":0.939444,"about_ca_system_score_codex":0.0000697077,"about_ca_system_score_gemma":0.000012034267,"threshold_uncertainty_score":0.3742905},"labels":[],"label_agreement":null},{"id":"W4394834800","doi":"10.4322/rae.v12n2.e201716.en","title":"SIMULATION SUPPORTS AS INTERMEDIATE DESIGN OBJECTS: EXPERIENCES IN THE PETROLEUM REFINING INDUSTRY","year":2017,"lang":"en","type":"article","venue":"Revista Ação Ergonômica","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Refining (metallurgy); Oil refinery; Petroleum industry; Petroleum engineering; Petroleum; Computer science; Process engineering; Manufacturing engineering; Biochemical engineering; Engineering; Chemistry; Waste management; Metallurgy; Materials science; Environmental engineering; Organic chemistry","score_opus":0.02640431256823984,"score_gpt":0.2765881885410242,"score_spread":0.25018387597278435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394834800","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9838747,0.00025269575,0.005505602,0.00009288763,0.0006020284,0.00013432647,0.0000022079932,0.0001266095,0.009408971],"genre_scores_gemma":[0.99930626,0.000033541175,0.00020661434,0.00006327805,0.00014063476,0.00007445117,0.000005705231,0.00001553494,0.0001540026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912405,0.000072090275,0.00027992672,0.00016743735,0.00016283031,0.0001936502],"domain_scores_gemma":[0.9992842,0.0001216956,0.00010524367,0.00042261608,0.00002638514,0.00003987656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003111993,0.00014030891,0.00014644284,0.000078610945,0.00020109373,0.00035708913,0.00033298094,0.00016366263,0.00014619455],"category_scores_gemma":[0.00024406126,0.00010811831,0.00004610184,0.000073976975,0.00008226706,0.00035411626,0.000023296172,0.0003956512,0.00004018977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032808416,0.00017429839,0.04470168,0.0004965675,0.00019966127,0.00031888712,0.096607074,0.44416514,0.006477901,0.016952904,0.0055965777,0.38398123],"study_design_scores_gemma":[0.0021375534,0.00045958193,0.058602102,0.0016214887,0.00012396982,0.00021178747,0.05633573,0.7897548,0.006190743,0.0017583694,0.08070425,0.0020995953],"about_ca_topic_score_codex":0.000021342548,"about_ca_topic_score_gemma":0.000013668623,"teacher_disagreement_score":0.38188162,"about_ca_system_score_codex":0.000057391142,"about_ca_system_score_gemma":0.00003671454,"threshold_uncertainty_score":0.44089365},"labels":[],"label_agreement":null},{"id":"W4394912932","doi":"10.5267/j.ijdns.2024.4.004","title":"Quantitative exploration of digital facility management adoption among United Arab Emirates facility managers","year":2024,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Facility management; Business; Engineering management; Operations management; Engineering; Marketing","score_opus":0.04548565903498236,"score_gpt":0.291006665308699,"score_spread":0.24552100627371665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394912932","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61202645,0.0005155946,0.38409472,0.00015720115,0.0016830685,0.000074159725,0.00037537748,0.00003746707,0.0010359483],"genre_scores_gemma":[0.9978847,0.0005126781,0.0014060073,0.0000050412323,0.00005893561,9.817769e-7,0.000111629306,0.0000017871055,0.000018247623],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990944,0.000012101994,0.00030817842,0.0001323762,0.00037257175,0.000080342565],"domain_scores_gemma":[0.99954116,0.00004319923,0.00007611299,0.00011036714,0.00018943532,0.00003969607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048248668,0.000067079905,0.00007864397,0.00025262454,0.00004034955,0.00026106762,0.00036441398,0.000021006865,0.0000133699705],"category_scores_gemma":[0.00002401079,0.000056743505,0.000023298287,0.00043135302,0.00024063651,0.004330004,0.00007635818,0.00010368637,0.000003505143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002182649,0.000067840614,0.013914857,0.00021003775,0.00062737236,0.000057957437,0.0016569435,0.12924185,0.0016831664,0.06867029,0.0038849378,0.7797665],"study_design_scores_gemma":[0.00044219414,0.00016491335,0.01732591,0.0006290865,0.000083832645,0.00007903968,0.0035034418,0.9476214,0.001056389,0.014769254,0.014010969,0.0003135672],"about_ca_topic_score_codex":0.000003515905,"about_ca_topic_score_gemma":0.000004743073,"teacher_disagreement_score":0.8183796,"about_ca_system_score_codex":0.00004745861,"about_ca_system_score_gemma":0.000021792735,"threshold_uncertainty_score":0.31391487},"labels":[],"label_agreement":null},{"id":"W4394927140","doi":"10.36680/j.itcon.2024.014","title":"Development of standard-based information requirements for the facility management of a canteen","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"MIT Portugal; Fundação para a Ciência e a Tecnologia; Ministério da Ciência, Tecnologia e Ensino Superior","keywords":"Systems engineering; Facility management; Engineering; Engineering management; Computer science; Software engineering; Business","score_opus":0.009104826860086975,"score_gpt":0.2316689763949585,"score_spread":0.22256414953487152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394927140","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13429184,0.00014345696,0.86372644,0.00023198925,0.0009408061,0.0002938273,0.000045168945,0.00005685094,0.00026963127],"genre_scores_gemma":[0.94630754,0.000059056743,0.053587604,0.000005269051,0.0000063792854,0.000019289186,0.000011925457,0.0000020299553,8.9360117e-7],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986294,0.00000554266,0.0010694197,0.000025569907,0.0001949206,0.000075172255],"domain_scores_gemma":[0.9992746,0.000023536728,0.0003107138,0.000082530605,0.00029833918,0.000010268483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043383625,0.000072582014,0.00013484659,0.00080998626,0.000034725603,0.000021359883,0.00010657586,0.00010201787,0.000016618325],"category_scores_gemma":[0.000024808822,0.000055707605,0.000049940445,0.00044283448,0.00008896019,0.0010268551,0.000009024136,0.00014521614,0.0000017044072],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000704852,0.0000037643667,0.00033576158,0.00056783267,0.000117239695,1.4647293e-7,0.00053432793,0.0041021244,0.00036428505,0.019522026,0.00010324831,0.97427875],"study_design_scores_gemma":[0.005940504,0.0004963073,0.003994112,0.0030194025,0.0002971767,0.00030112357,0.050303992,0.18050854,0.5904326,0.016317729,0.14782721,0.00056133495],"about_ca_topic_score_codex":0.0000012072786,"about_ca_topic_score_gemma":0.000003356479,"teacher_disagreement_score":0.97371745,"about_ca_system_score_codex":0.000196008,"about_ca_system_score_gemma":0.0001236398,"threshold_uncertainty_score":0.22716902},"labels":[],"label_agreement":null},{"id":"W4394956535","doi":"10.3390/buildings14041151","title":"Design Analysis of Mass Timber and Volumetric Modular Strategies as Counterproposals for an Existing Reinforced Concrete Hotel","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal; Université du Québec à Chicoutimi","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Structural engineering; Engineering; Computer science; Architectural engineering; Civil engineering; Programming language","score_opus":0.01983606079689911,"score_gpt":0.26683355604903114,"score_spread":0.24699749525213202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394956535","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37216237,0.00045503155,0.6260411,0.000005229617,0.000119882105,0.00011916555,0.000012937233,0.00015481573,0.00092945184],"genre_scores_gemma":[0.9705868,0.000037144866,0.029088095,0.000008033687,0.000035264547,0.000022895128,0.000016780426,0.000019377603,0.00018564209],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994068,0.0000107306205,0.00021302507,0.00015221674,0.0001011243,0.000116062925],"domain_scores_gemma":[0.9996712,0.0000842778,0.000031442734,0.00009526478,0.00008097988,0.00003682582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019815905,0.00010539941,0.00018477056,0.00040045584,0.00003681644,0.00017613676,0.00005505445,0.00007614842,0.00003358579],"category_scores_gemma":[0.00002839714,0.00010176758,0.00006493774,0.0006550726,0.000038526807,0.0003453213,0.000005186433,0.00006348773,0.0000018091795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005127024,9.124159e-7,0.00012946127,0.0004127485,0.0013697427,0.0000035768976,0.0012288284,0.33407056,0.5494275,0.09756976,0.00048763654,0.015247997],"study_design_scores_gemma":[0.00008488794,0.00006772169,0.000040216983,0.000032538377,0.00033763307,0.0000053849208,0.000385889,0.9810152,0.016185327,0.0012240583,0.00050146395,0.000119692224],"about_ca_topic_score_codex":0.00006878082,"about_ca_topic_score_gemma":0.000002006752,"teacher_disagreement_score":0.64694464,"about_ca_system_score_codex":0.000031052354,"about_ca_system_score_gemma":0.000028954997,"threshold_uncertainty_score":0.41499615},"labels":[],"label_agreement":null},{"id":"W4394970279","doi":"","title":"Exploring the Design of Animated Transitions between Abstract and Concrete Visualizations in Immersive Environments","year":2024,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada; Agence Nationale de la Recherche","keywords":"Computer science; Human–computer interaction; Computer graphics (images); Animation","score_opus":0.03679362608210144,"score_gpt":0.22818692153699724,"score_spread":0.1913932954548958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394970279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67208403,0.001452631,0.3187091,0.0014827232,0.00025416588,0.00063387083,0.00021578475,0.00013396698,0.0050337045],"genre_scores_gemma":[0.9962266,0.0011825697,0.002140015,0.0000049783293,0.000010364607,0.000106985506,0.0001792829,0.000029336163,0.000119855235],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998431,0.00064891623,0.00038781078,0.0002477363,0.0001502247,0.00013429362],"domain_scores_gemma":[0.9986956,0.00060499535,0.000095063275,0.0004214655,0.00013522201,0.00004765777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010106663,0.00017443333,0.00019837727,0.0001749752,0.00010739336,0.00009711204,0.00022623251,0.0001159099,0.000035169276],"category_scores_gemma":[0.00008884578,0.0001670573,0.000063653555,0.0002408252,0.00015862683,0.00010498319,0.00013792036,0.00044955304,0.000007696186],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041148865,0.00021222455,0.0066891746,0.0025737046,0.0015513384,0.000016204958,0.19593963,0.051484108,0.36288664,0.24815248,0.0007408194,0.12971255],"study_design_scores_gemma":[0.0012138651,0.000002009523,0.079976924,0.008499259,0.0005289134,0.000021783599,0.0047932086,0.31487375,0.570662,0.015019102,0.0029962016,0.0014129684],"about_ca_topic_score_codex":0.00019055058,"about_ca_topic_score_gemma":0.000099748286,"teacher_disagreement_score":0.32414258,"about_ca_system_score_codex":0.00006754131,"about_ca_system_score_gemma":0.000045460212,"threshold_uncertainty_score":0.6812399},"labels":[],"label_agreement":null},{"id":"W4394996194","doi":"10.1016/j.cie.2024.110173","title":"Digital twin for production estimation, scheduling and real-time monitoring in offsite construction","year":2024,"lang":"en","type":"article","venue":"Computers & Industrial Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Scheduling (production processes); Estimation; Production (economics); Computer science; Real-time computing; Engineering; Operations management; Systems engineering; Economics","score_opus":0.013939764796656328,"score_gpt":0.21233667397358585,"score_spread":0.19839690917692954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394996194","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70287514,0.0003046007,0.28748566,0.00007984726,0.00773359,0.00037322784,0.000009539156,0.0010431083,0.00009527911],"genre_scores_gemma":[0.96982086,0.000038516086,0.028371431,8.010178e-7,0.0016095755,0.00004963702,0.00002670175,0.000045229597,0.00003723785],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923694,0.0000050326958,0.00027731268,0.0002199468,0.00008409845,0.00017666919],"domain_scores_gemma":[0.99975044,0.000072743605,0.000016787813,0.00008207638,0.000028166818,0.000049769846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011383713,0.00016019467,0.00015086328,0.00031097015,0.000038677965,0.00024391367,0.000045585377,0.00013861954,0.0000021467615],"category_scores_gemma":[0.000054410943,0.00018560707,0.00003856365,0.00031928343,0.000025380132,0.00062182243,0.000013128588,0.00021693615,0.0000045959177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007350572,0.0000026707844,0.00032441612,0.00009362245,0.000031789674,0.0000016398897,0.00014729777,0.60979086,0.006862451,0.0007849624,0.000084538166,0.3818684],"study_design_scores_gemma":[0.00028721424,0.000018915056,0.00021105929,0.0005059962,0.000014103196,0.000049341914,0.0000566879,0.9932437,0.0038314771,0.00007933665,0.0015016287,0.00020056627],"about_ca_topic_score_codex":0.0000041362923,"about_ca_topic_score_gemma":2.5622782e-7,"teacher_disagreement_score":0.3834528,"about_ca_system_score_codex":0.0001459013,"about_ca_system_score_gemma":0.000022664264,"threshold_uncertainty_score":0.7568837},"labels":[],"label_agreement":null},{"id":"W4395016304","doi":"10.1007/978-3-031-53521-5_4","title":"The Role of CAD and PLM in Ecodesign: A Short Review","year":2024,"lang":"en","type":"review","venue":"Decision engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Ecodesign; CAD; Engineering; Systems engineering; Manufacturing engineering; Engineering drawing","score_opus":0.015501867868175392,"score_gpt":0.2715237901023975,"score_spread":0.25602192223422215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395016304","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000036877796,0.99661463,0.002078638,0.0000023086986,0.00051449245,0.00028796608,0.000009991165,0.00008981626,0.00039844617],"genre_scores_gemma":[0.0001157526,0.9993351,0.000328397,0.0000014732248,0.000049957325,0.000098618664,0.000005685732,0.000048307393,0.000016720287],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99892396,0.000013285988,0.0006206411,0.00016261378,0.00014098846,0.0001384853],"domain_scores_gemma":[0.9994718,0.00021443807,0.000026258704,0.00023069992,0.000019010897,0.00003779289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028419317,0.00024356111,0.0006573228,0.0002073309,0.000015350159,0.000035667872,0.00014827272,0.00015015769,0.00000768632],"category_scores_gemma":[0.00006182963,0.00015863386,0.00015799866,0.00038991976,0.000012434747,0.000051119532,0.00003308508,0.0003816539,0.000016411912],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[2.2460485e-7,8.235598e-7,2.9804022e-7,0.009240702,0.000027173113,0.000001987516,0.0000066587636,0.00022329166,0.0000019748773,0.0011843193,0.00024143817,0.98907113],"study_design_scores_gemma":[0.0000138621035,0.0000038864914,0.0000013838724,0.044768307,0.00013934933,0.00005065056,0.000004793828,0.011258821,0.000002320339,0.00014272552,0.94347143,0.00014246246],"about_ca_topic_score_codex":0.0000015868117,"about_ca_topic_score_gemma":0.0000062467343,"teacher_disagreement_score":0.9889287,"about_ca_system_score_codex":0.00006220557,"about_ca_system_score_gemma":0.000023883993,"threshold_uncertainty_score":0.6468901},"labels":[],"label_agreement":null},{"id":"W4395683654","doi":"10.18280/ijsse.140222","title":"An Artificial Neural Network Approach for Construction Project Risk Management","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Computer science; Risk management; Risk analysis (engineering); Construction engineering; Engineering; Artificial intelligence; Business","score_opus":0.007468874893476163,"score_gpt":0.22507957109454096,"score_spread":0.2176106962010648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395683654","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04000837,0.0011968823,0.9533718,0.000047099624,0.004505081,0.00014741851,0.000043090997,0.00013519768,0.00054505887],"genre_scores_gemma":[0.9675256,0.00076929684,0.03021375,0.000006717888,0.0014364346,0.0000071603736,0.000020761228,0.000016697706,0.0000035693195],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933374,0.0000102381655,0.0003115677,0.00008965946,0.00015165124,0.000103136],"domain_scores_gemma":[0.99976176,0.000031712785,0.000041103573,0.00004077893,0.000085763655,0.000038904684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022089691,0.00009870063,0.000106717045,0.00017589949,0.000037851667,0.00013368082,0.000095207644,0.00005387865,0.000005851899],"category_scores_gemma":[0.0000071607415,0.00009341011,0.00006457417,0.00009169016,0.000018315552,0.00036257325,0.00000824824,0.00021122114,3.0569035e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010503061,0.000012954249,0.000046550715,0.00011966466,0.00033447554,0.000011599523,0.00044784485,0.6913643,0.0003805509,0.08597929,0.00015940132,0.22103836],"study_design_scores_gemma":[0.00017964806,0.000047743662,0.000097559525,0.0000643181,0.00004649529,0.00032847215,0.00022859512,0.98209137,0.00025287463,0.0025501396,0.014005512,0.00010725478],"about_ca_topic_score_codex":0.0000022057277,"about_ca_topic_score_gemma":0.000001405497,"teacher_disagreement_score":0.92751724,"about_ca_system_score_codex":0.00005726643,"about_ca_system_score_gemma":0.000009896099,"threshold_uncertainty_score":0.38091537},"labels":[],"label_agreement":null},{"id":"W4396230282","doi":"10.18280/ts.410206","title":"Optimizing Building Information Modeling System Design Elements for Enhanced User Experience: A Multidimensional Approach","year":2024,"lang":"en","type":"article","venue":"Traitement du signal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Building information modeling; Systems engineering; Human–computer interaction; Engineering; Operations management","score_opus":0.020833007963775508,"score_gpt":0.2357003749310742,"score_spread":0.2148673669672987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396230282","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04858695,0.00012948673,0.9493225,0.000005752186,0.00052454707,0.00056978123,0.000013332384,0.00051209226,0.00033553742],"genre_scores_gemma":[0.7859193,0.0000043395244,0.2133699,0.000012712058,0.00011058459,0.0005176712,0.000040628038,0.000016747816,0.000008129273],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989368,0.000016575781,0.00043642416,0.00015694369,0.00023324911,0.00022006333],"domain_scores_gemma":[0.9997448,0.000032439224,0.000028925842,0.00006862962,0.000074763666,0.000050468392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023889107,0.00016361914,0.00012113632,0.00015847414,0.0001269829,0.00015357704,0.00007201942,0.0000675921,0.000040086823],"category_scores_gemma":[0.0000040430045,0.00015418114,0.00007129595,0.00013537423,0.000009374468,0.00084852363,0.000010124161,0.00009369559,0.00000981007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026396025,0.000007857451,0.0000013298139,0.00027034152,0.000057416233,2.9562227e-7,0.0023693752,0.9232218,0.050329987,0.013027196,0.00012517597,0.010562788],"study_design_scores_gemma":[0.0003744788,0.000025631105,9.638502e-7,0.00015719146,0.000022693583,0.0000068581717,0.0019699668,0.9659791,0.030543052,0.000029962677,0.00072374905,0.00016637551],"about_ca_topic_score_codex":0.0000028556158,"about_ca_topic_score_gemma":1.787602e-7,"teacher_disagreement_score":0.73733234,"about_ca_system_score_codex":0.00018369677,"about_ca_system_score_gemma":0.00002621272,"threshold_uncertainty_score":0.6287324},"labels":[],"label_agreement":null},{"id":"W4396709979","doi":"10.11159/csee24","title":"Proceedings of the 9th World Congress on Civil, Structural, and Environmental Engineering","year":2024,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering; Political science","score_opus":0.00464622513290687,"score_gpt":0.18137927987041563,"score_spread":0.17673305473750878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396709979","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96721834,0.0043585654,0.000003822183,0.00016633297,0.017643662,0.0013852452,0.0010671547,0.00025107287,0.007905785],"genre_scores_gemma":[0.97851974,0.000975494,0.0001366484,0.000037887727,0.00038406003,0.000092249444,0.000044330634,0.0002374027,0.019572165],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9967674,0.000006373262,0.0009089803,0.0008493552,0.0007984362,0.0006694538],"domain_scores_gemma":[0.9989709,0.000093244984,0.0004141723,0.00028979775,0.000024349652,0.00020753514],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012416283,0.0012102698,0.0009456709,0.0006003889,0.00025178818,0.0002804703,0.00076583953,0.00035292516,0.0003650747],"category_scores_gemma":[0.000020194042,0.00088718615,0.00033616385,0.00047375972,0.0005071168,0.00044390679,0.00045825148,0.001579636,0.00001776739],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050231273,0.000133901,0.008369788,0.018658767,0.004017605,0.00001143123,0.0018576321,0.11713212,0.661046,0.030502599,0.14682163,0.010946148],"study_design_scores_gemma":[0.0039875293,0.0005956345,0.018226743,0.017921312,0.0017443824,0.0007587109,0.0021093253,0.20713204,0.54528815,0.0009351631,0.19449942,0.0068016136],"about_ca_topic_score_codex":0.000011556413,"about_ca_topic_score_gemma":0.00002284183,"teacher_disagreement_score":0.11575793,"about_ca_system_score_codex":0.00037268572,"about_ca_system_score_gemma":0.000013519922,"threshold_uncertainty_score":0.9993579},"labels":[],"label_agreement":null},{"id":"W4396721030","doi":"10.21814/uminho.ed.164.14","title":"Interoperabilidade BIM-FM: Desenvolvimento de interface customizada para visualização IFC integrada a plataforma de gestão","year":2024,"lang":"pt","type":"book-chapter","venue":"UMinho Editora eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science","score_opus":0.01824542945123212,"score_gpt":0.26289446524338667,"score_spread":0.24464903579215455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396721030","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03623326,0.011479028,0.23344034,0.00063053553,0.18678893,0.0045189476,0.0014107296,0.005336361,0.52016187],"genre_scores_gemma":[0.65419924,0.00037404886,0.0019647118,0.00025115864,0.024180893,0.00030100447,0.00022452815,0.0010221066,0.31748232],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946943,0.00010513813,0.0016932895,0.0012912482,0.0008254092,0.0013906442],"domain_scores_gemma":[0.9972214,0.000245671,0.00035532066,0.0011194812,0.0003221347,0.00073597446],"candidate_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"consensus_categories":["metaepi_narrow","research_integrity","insufficient_payload"],"category_scores_codex":[0.00061071,0.0018099545,0.0012566673,0.0009292079,0.00028505505,0.00092512177,0.0009647522,0.0020392078,0.0016469117],"category_scores_gemma":[0.00007918626,0.0017819313,0.0007554931,0.00012362901,0.00049602333,0.0003800916,0.00041391904,0.003528374,0.0021294514],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015865343,0.00033165168,0.00029624774,0.007679427,0.00722539,0.0015530217,0.041215114,0.0034688632,0.045773715,0.45862618,0.22000006,0.21224378],"study_design_scores_gemma":[0.001152218,0.000518758,0.0000056648,0.0048814802,0.00097307446,0.00085273327,0.0039039794,0.048854336,0.034044664,0.0076666656,0.8944839,0.0026625262],"about_ca_topic_score_codex":0.0005441519,"about_ca_topic_score_gemma":0.00064190465,"teacher_disagreement_score":0.67448384,"about_ca_system_score_codex":0.0024216445,"about_ca_system_score_gemma":0.0005342138,"threshold_uncertainty_score":0.9994646},"labels":[],"label_agreement":null},{"id":"W4396761923","doi":"10.2175/193864718825159350","title":"Delivering Projects using Community Based Partnership to meet Chesapeake Bay TMDL Requirements in Prince George's County, MD and Key Lessons Learned","year":2024,"lang":"en","type":"article","venue":"Proceedings of the Water Environment Federation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"George (robot); Chesapeake bay; General partnership; Key (lock); Computer science; Bay; Engineering; Aeronautics; Environmental science; Operations research; Political science; Computer security; Oceanography; Civil engineering; Estuary; Geology; Law","score_opus":0.05588441239115496,"score_gpt":0.25769198845676883,"score_spread":0.20180757606561386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396761923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99708706,0.000040718096,0.0010670066,0.0006096438,0.00009374325,0.00033664572,0.0000029334299,0.00006650593,0.0006957314],"genre_scores_gemma":[0.99900544,0.000032021933,0.00076744123,0.000045264496,0.000026763375,0.00004304283,0.0000047327762,0.000020703079,0.000054620854],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992541,0.000020001064,0.00021986318,0.00015594963,0.00018564845,0.00016440153],"domain_scores_gemma":[0.9998386,0.00001158038,0.000024841538,0.00007615603,0.000015931817,0.000032889402],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039834963,0.00013495555,0.00010887696,0.000088161236,0.00018190798,0.00018250663,0.000096507945,0.00006362451,0.0000108521845],"category_scores_gemma":[0.000009529854,0.00009382673,0.000027100808,0.00007545052,0.00003932023,0.00034164678,0.00007401163,0.00015780653,0.0000027642625],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028580496,0.00003632733,0.011351389,0.00049054355,0.000030626754,3.1600536e-7,0.005628561,0.018359046,0.96045,0.0010405848,0.00008059272,0.0025034149],"study_design_scores_gemma":[0.00034895877,0.000051531242,0.0045275716,0.00051082467,0.00004323703,0.000006349943,0.0007541362,0.1517746,0.83756906,0.00080688845,0.003318534,0.00028828668],"about_ca_topic_score_codex":0.00004691049,"about_ca_topic_score_gemma":0.00009437334,"teacher_disagreement_score":0.13341555,"about_ca_system_score_codex":0.00021403076,"about_ca_system_score_gemma":0.0000081208855,"threshold_uncertainty_score":0.3826143},"labels":[],"label_agreement":null},{"id":"W4396869504","doi":"10.20944/preprints202405.0681.v1","title":"Integrating Building Information Modeling (BIM) and Life Cycle Cost Analysis (LCCA) to Evaluate the Economic Benefits of Designing Aging-in-Place Homes at the Conceptual Stage","year":2024,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Life-cycle cost analysis; Building information modeling; Stage (stratigraphy); Conceptual framework; Architectural engineering; Computer science; Operations management; Engineering; Risk analysis (engineering); Business; Sociology","score_opus":0.056295888800140755,"score_gpt":0.30074186254438334,"score_spread":0.2444459737442426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396869504","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97320116,0.000760997,0.02347213,0.00022667283,0.0005048869,0.0006584597,0.000068637215,0.00013884957,0.00096821337],"genre_scores_gemma":[0.9988915,0.00020232308,0.0004762707,0.000044144177,0.00007186147,0.00021328592,0.000033618388,0.00002864337,0.000038357535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99817646,0.00011819726,0.00082401425,0.0003937518,0.00023558825,0.00025197337],"domain_scores_gemma":[0.9989015,0.00019482085,0.00016515086,0.00055121747,0.00010705154,0.00008026607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013347244,0.00031699543,0.00042166444,0.00042805646,0.00014770668,0.00013446686,0.00035663033,0.00017653481,0.0001519821],"category_scores_gemma":[0.00017263372,0.00024095128,0.00016803292,0.00032875055,0.00008544159,0.00023823668,0.00089052937,0.0008013499,0.000080324266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013567365,0.0000017312677,0.0136644645,0.000098570985,0.00034921826,1.5769042e-7,0.0058694845,0.97187054,0.0006785039,0.0033478648,0.000005932048,0.004099985],"study_design_scores_gemma":[0.00015139887,0.0000048912048,0.0038816496,0.00029751987,0.00029769502,0.0000021086169,0.004567016,0.9814399,0.008503136,0.0005276025,0.00007024908,0.00025685396],"about_ca_topic_score_codex":0.0008134217,"about_ca_topic_score_gemma":0.00096268114,"teacher_disagreement_score":0.025690343,"about_ca_system_score_codex":0.0005125096,"about_ca_system_score_gemma":0.00012526484,"threshold_uncertainty_score":0.98257077},"labels":[],"label_agreement":null},{"id":"W4396899696","doi":"10.56238/seveniengineering-005","title":"Good sustainability practices applied in buildings that use BIM technology","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact; Adidas (Canada)","funders":"","keywords":"Building information modeling; Work (physics); Sustainability; Multidisciplinary approach; Computer science; Relevance (law); Anticipation (artificial intelligence); Risk analysis (engineering); Sustainable development; Construction engineering; Engineering; Business; Operations management","score_opus":0.012137302809965458,"score_gpt":0.24615657311394878,"score_spread":0.23401927030398334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396899696","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91891664,0.00043714483,0.048323367,0.0019882736,0.00059052685,0.00029787593,0.0000020185244,0.0022810472,0.02716308],"genre_scores_gemma":[0.99760664,0.00002969871,0.0020099394,0.0000131258275,0.000020391313,0.000047529393,0.0000013033683,0.000010381754,0.00026097964],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957573,0.000004960655,0.00010507546,0.00014012157,0.000053716,0.00012036578],"domain_scores_gemma":[0.99977756,0.00005439814,0.000014123511,0.00011560765,0.000023124383,0.000015178422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008549428,0.00007365207,0.000068132584,0.00024657158,0.000015602063,0.000098501376,0.000054266016,0.000116940166,0.000098967525],"category_scores_gemma":[0.000053334687,0.000064035594,0.000016699312,0.00044035623,0.000033541313,0.00033577724,0.000014011614,0.0002062444,0.000022237742],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000036164295,0.000008720873,0.009146315,0.00010100366,0.000015081976,0.0000052778128,0.00008914281,0.00028635998,0.0017525704,0.8917897,0.00033386366,0.09646835],"study_design_scores_gemma":[0.00055232825,0.000060012248,0.011261938,0.00009771111,0.00005400045,0.00013641389,0.014293242,0.052053552,0.08201656,0.24826217,0.5903579,0.0008541765],"about_ca_topic_score_codex":0.000069948546,"about_ca_topic_score_gemma":0.00015390554,"teacher_disagreement_score":0.6435275,"about_ca_system_score_codex":0.00012395481,"about_ca_system_score_gemma":0.000025600357,"threshold_uncertainty_score":0.2611296},"labels":[],"label_agreement":null},{"id":"W4398252220","doi":"10.1061/jcemd4.coeng-14527","title":"Determining Factors Influencing BIM Adoption: A Competency-Driven Approach","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Process management; Building information modeling; Business; Knowledge management; Systems engineering; Computer science; Engineering; Operations management","score_opus":0.006709873202250552,"score_gpt":0.18520324016720616,"score_spread":0.1784933669649556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398252220","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5099835,0.0013733981,0.4826599,0.000023488858,0.003077166,0.000091800546,0.0000020427958,0.0003169925,0.002471699],"genre_scores_gemma":[0.959177,0.0006328634,0.03997486,0.0000043205537,0.00016992015,0.000004138074,0.0000013256139,0.00001780971,0.000017741979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993287,0.000006578978,0.0003178958,0.00008906881,0.00014392695,0.00011383944],"domain_scores_gemma":[0.9997793,0.00001628183,0.0000415229,0.00006117889,0.00003806441,0.000063678504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008445262,0.0001308594,0.00014633358,0.00041833866,0.000038495837,0.00011696563,0.000053713477,0.00004930275,0.000011172472],"category_scores_gemma":[0.0000033414497,0.00011694875,0.00006844345,0.00019876243,0.000025780482,0.00031999283,0.000012610594,0.00019913838,0.000001485711],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007311501,0.000012670396,0.0012989846,0.0017451714,0.0007552056,0.0000699426,0.0009629447,0.5815205,0.0026147335,0.14345431,0.00029089086,0.26726735],"study_design_scores_gemma":[0.00054122193,0.000094455,0.0068012797,0.0010269784,0.00027275336,0.0028497386,0.0038304399,0.953047,0.00066749676,0.00049071026,0.02988856,0.00048937916],"about_ca_topic_score_codex":4.834139e-7,"about_ca_topic_score_gemma":1.847795e-7,"teacher_disagreement_score":0.44919354,"about_ca_system_score_codex":0.00006702216,"about_ca_system_score_gemma":0.000011604704,"threshold_uncertainty_score":0.47690317},"labels":[],"label_agreement":null},{"id":"W4398775382","doi":"10.1061/jcemd4.coeng-14227","title":"Sustainability in Prefabricated Construction: Enhancing Multicriteria Analysis and Prediction Using Machine Learning","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Sustainability; Computer science; Machine learning; Engineering; Artificial intelligence; Architectural engineering; Construction engineering; Ecology","score_opus":0.003752955277940804,"score_gpt":0.20285573293684428,"score_spread":0.19910277765890347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398775382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6018229,0.001830424,0.39501634,0.000048373226,0.00097023987,0.00010624282,0.0000031988889,0.00014212063,0.000060130817],"genre_scores_gemma":[0.9819909,0.0010715193,0.016827783,0.0000015476157,0.00007602324,0.000004258493,0.000002598891,0.000013069814,0.000012345051],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912053,0.000025311907,0.00046688048,0.00013830484,0.00012003445,0.00012893738],"domain_scores_gemma":[0.99972,0.000028490591,0.000055814064,0.000058549896,0.000078163655,0.00005901105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027899392,0.0001352186,0.00021639452,0.0010600062,0.00004573691,0.00011360869,0.000029320934,0.00006275302,0.0000132820805],"category_scores_gemma":[0.000019587183,0.00013494329,0.00006085108,0.00070356356,0.00004979002,0.000350921,0.0000162917,0.0002712418,1.6500313e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040233692,0.000016647535,0.02396342,0.0018789904,0.0016840693,0.00007444255,0.0006861102,0.7637762,0.010324802,0.0073554083,0.000010953596,0.19018875],"study_design_scores_gemma":[0.00030836798,0.000029212797,0.008901115,0.00018814903,0.00043744608,0.00071802386,0.0007767067,0.9854816,0.00081992836,0.00019824773,0.0020040586,0.00013714697],"about_ca_topic_score_codex":0.000016107264,"about_ca_topic_score_gemma":0.000008359595,"teacher_disagreement_score":0.38016793,"about_ca_system_score_codex":0.00019151627,"about_ca_system_score_gemma":0.000013722842,"threshold_uncertainty_score":0.5502828},"labels":[],"label_agreement":null},{"id":"W4399043571","doi":"10.22260/isarc2024/0174","title":"Analysis of openBIM Adoptions and Implementations: Global Perspectives and Canadian Industry Adoption","year":2024,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Implementation; Computer science; Telecommunications; Data science; Business; Software engineering","score_opus":0.009728157840064202,"score_gpt":0.24550205306183906,"score_spread":0.23577389522177486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399043571","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9917466,0.0009917249,0.00006108592,0.0003933062,0.00007690088,0.00009193907,0.00010724086,0.000031268457,0.006499915],"genre_scores_gemma":[0.9994806,0.00012972545,0.0003142758,0.000007097202,0.000018441038,0.000009082631,0.0000025186337,0.00000403101,0.000034233537],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99964833,0.0000016954103,0.00012281112,0.00008767532,0.0000689308,0.00007056658],"domain_scores_gemma":[0.99981266,0.0000072658745,0.000022108477,0.000030028554,0.000087852226,0.00004009548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000062837455,0.00005739417,0.0000837819,0.00017430808,0.000052087933,0.000052056374,0.000051072948,0.000059972775,0.000047597754],"category_scores_gemma":[0.000012455182,0.000047410864,0.00003717421,0.00067571166,0.000072330164,0.00018891231,0.00001539597,0.00009677249,3.2446653e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007662313,0.00001522114,0.36304745,0.00034146023,0.0016512927,2.1091935e-7,0.0073839426,0.00053815835,0.0076232245,0.58159685,0.0019035089,0.03589102],"study_design_scores_gemma":[0.0002676502,0.000050595165,0.8632129,0.00024589035,0.0019355403,0.000037480284,0.08139124,0.040866062,0.0023699875,0.006846995,0.002471814,0.00030383994],"about_ca_topic_score_codex":0.003117723,"about_ca_topic_score_gemma":0.0047433535,"teacher_disagreement_score":0.5747499,"about_ca_system_score_codex":0.000078561236,"about_ca_system_score_gemma":0.000027552589,"threshold_uncertainty_score":0.47130853},"labels":[],"label_agreement":null},{"id":"W4399043768","doi":"10.22260/isarc2024/0037","title":"Performance Evaluation of Genetic Algorithm and Particle Swarm Optimization in Off-Site Construction Scheduling","year":2024,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Computer science; Genetic algorithm; Scheduling (production processes); Algorithm; Multi-swarm optimization; Metaheuristic; Mathematical optimization; Mathematics; Machine learning","score_opus":0.010348799172307572,"score_gpt":0.21619183396070887,"score_spread":0.2058430347884013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399043768","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99548733,0.00096711545,0.0024190831,0.000042181757,0.00030252148,0.00014907657,0.000002433897,0.000042940406,0.00058731803],"genre_scores_gemma":[0.98204505,0.00024669064,0.017638622,0.0000020810558,0.00003584832,0.00001532581,6.868807e-7,0.000008851869,0.000006845527],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943626,0.000004362834,0.00021065639,0.00009114502,0.00018532388,0.000072244606],"domain_scores_gemma":[0.9997452,0.0000087930675,0.000039585426,0.000034023724,0.00015911517,0.000013307061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025215218,0.00006261295,0.00007479702,0.0000752481,0.000024098761,0.000024306391,0.000043308588,0.000043359425,0.000013310547],"category_scores_gemma":[0.000022434673,0.00005279972,0.00002089705,0.00029737264,0.000052727035,0.00024609387,0.000014024902,0.00007946171,9.375144e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000063692237,0.00000800099,0.023984142,0.00027382828,0.000021737358,2.7884935e-8,0.000934968,0.3889037,0.021995692,0.000944281,0.000012589878,0.56291467],"study_design_scores_gemma":[0.00014656599,0.000011938021,0.007942775,0.00017459871,0.0000357497,0.000010177981,0.0002654449,0.93928283,0.05175324,0.00031341947,0.000013991266,0.00004927412],"about_ca_topic_score_codex":0.000005876862,"about_ca_topic_score_gemma":8.6857233e-7,"teacher_disagreement_score":0.5628654,"about_ca_system_score_codex":0.00004440307,"about_ca_system_score_gemma":0.000017260794,"threshold_uncertainty_score":0.21531102},"labels":[],"label_agreement":null},{"id":"W4399102646","doi":"10.1201/9781032665443-70","title":"Performance-Based Seismic Design for Unreinforced Masonry: A Literature Review","year":2024,"lang":"en","type":"review","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Unreinforced masonry building; Masonry; Geology; Civil engineering; Architectural engineering; Engineering","score_opus":0.03205393249848904,"score_gpt":0.27328321108812764,"score_spread":0.2412292785896386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399102646","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[1.045233e-8,0.9212406,0.072908215,0.00002191088,0.0009466633,0.0015556118,0.00005256327,0.00057553337,0.00269885],"genre_scores_gemma":[6.030332e-7,0.99110335,0.0031507656,0.00015891908,0.00021486288,0.0012679754,0.00045378078,0.00009002614,0.0035597277],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989379,0.000026345462,0.000500717,0.00022547974,0.00010502545,0.00020452052],"domain_scores_gemma":[0.9995015,0.000059393587,0.000055877106,0.00026289566,0.00006601475,0.000054321714],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017037326,0.00043785214,0.00090923824,0.00020252046,0.00003665033,0.00011388442,0.00015522065,0.00034176226,0.00012462403],"category_scores_gemma":[0.000012043154,0.0002923032,0.000542574,0.00052359654,0.000013254059,0.00010558736,0.000007648874,0.0003933388,0.00024951468],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[6.770854e-7,6.268662e-7,2.8147307e-9,0.26957253,0.000060767725,8.366146e-7,0.0000027774267,0.00033652436,4.5503228e-8,0.0003041622,0.044975493,0.68474555],"study_design_scores_gemma":[0.000042526874,0.000020672085,1.6571076e-9,0.18551426,0.00082999014,0.00004257386,5.638131e-7,0.08516837,0.0000021636179,0.000009157404,0.72812736,0.00024235003],"about_ca_topic_score_codex":2.0407546e-7,"about_ca_topic_score_gemma":1.7554935e-7,"teacher_disagreement_score":0.6845032,"about_ca_system_score_codex":0.000120640456,"about_ca_system_score_gemma":0.00016154425,"threshold_uncertainty_score":0.9999529},"labels":[],"label_agreement":null},{"id":"W4399172511","doi":"10.7202/1111451ar","title":"Translations in Concrete","year":2023,"lang":"en","type":"article","venue":"Journal of the Society for the Study of Architecture in Canada","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Materials science","score_opus":0.00863143895776166,"score_gpt":0.2058758164551283,"score_spread":0.19724437749736665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399172511","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99647737,0.00017941804,0.00043344707,0.0019464218,0.0006559049,0.0002357767,0.000012809459,0.0000043552327,0.00005448893],"genre_scores_gemma":[0.9997714,0.00001818192,0.00010405663,0.00003210451,0.000046363562,0.0000065754675,1.9227998e-7,0.000006079987,0.000015015754],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994442,0.000018785659,0.0002567154,0.000029682778,0.00016585765,0.00008475876],"domain_scores_gemma":[0.99960494,0.00021170289,0.00006300805,0.00007980088,0.000028355174,0.000012192489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002166223,0.000051029565,0.00010729389,0.00003069598,0.000053028325,0.0000041692924,0.00018149182,0.000018152137,0.0000034277484],"category_scores_gemma":[0.00001703958,0.000028711258,0.00018199597,0.00033169772,0.000020596503,0.000017761642,0.0000067076203,0.00026041685,3.2343465e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023832737,0.000005557843,0.008919504,0.00003502715,0.00029428827,0.0000010844468,0.015194621,0.95358676,0.0007681164,0.0000589225,0.0057526464,0.015359634],"study_design_scores_gemma":[0.010748107,0.0005619597,0.522965,0.0004966423,0.00053885573,0.00014248482,0.23319961,0.17837423,0.0023321062,0.0119069945,0.038058788,0.0006752211],"about_ca_topic_score_codex":0.06479789,"about_ca_topic_score_gemma":0.82753485,"teacher_disagreement_score":0.7752125,"about_ca_system_score_codex":0.00011736797,"about_ca_system_score_gemma":0.00018402959,"threshold_uncertainty_score":0.9414297},"labels":[],"label_agreement":null},{"id":"W4399178667","doi":"10.3389/fbuil.2024.1380106","title":"Modeling and categorizing standardized artifacts for scheduling occupancy on building construction sites","year":2024,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Occupancy; Schedule; Plan (archaeology); Scheduling (production processes); Process (computing); Reuse; Construction management; Space (punctuation); Computer science; Transport engineering; Operations research; Work (physics); Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","score_opus":0.012199074836528542,"score_gpt":0.2227024203751494,"score_spread":0.21050334553862085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399178667","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3916921,0.0027113527,0.604166,0.00004063625,0.0010237211,0.00016439187,0.000010312688,0.0001102899,0.00008119939],"genre_scores_gemma":[0.8516841,0.00070023735,0.14738944,0.000009887918,0.000101100726,0.000064931046,0.000010907307,0.000028318624,0.000011094891],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99917054,0.000012140475,0.00023388726,0.0002577,0.00012233245,0.00020342301],"domain_scores_gemma":[0.9998059,0.000022957474,0.000013459991,0.0001050265,0.000004939995,0.00004770238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013987177,0.00015849431,0.00016225241,0.00019908363,0.00007408859,0.00008615504,0.00004137332,0.00009307354,0.000011800018],"category_scores_gemma":[0.000011512314,0.00016367681,0.000045727273,0.00007258262,0.000040955587,0.00018211051,0.000011791756,0.00017486567,0.0000031902682],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049089696,0.000007911282,0.00238244,0.00015791124,0.000069364345,0.0000030832493,0.00029284105,0.77347183,0.013329917,0.004957694,0.000183228,0.2050947],"study_design_scores_gemma":[0.00030899764,0.000026833759,0.000068350484,0.0001246626,0.00002370348,0.000006904163,0.00040812793,0.9820136,0.007558119,0.006524837,0.0027487401,0.00018713926],"about_ca_topic_score_codex":0.000004750675,"about_ca_topic_score_gemma":0.000001960365,"teacher_disagreement_score":0.459992,"about_ca_system_score_codex":0.00028276286,"about_ca_system_score_gemma":0.000010579172,"threshold_uncertainty_score":0.66745466},"labels":[],"label_agreement":null},{"id":"W4399204586","doi":"10.36680/j.itcon.2024.018","title":"A cloud-based integration of Building Information Modeling and Virtual Reality through game engine to facilitate the design of Age-in-Place homes at the conceptual stage","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Game engine; Building information modeling; Virtual reality; Conceptual model; Cloud computing; Conceptual design; Engineering; Architectural engineering; Stage (stratigraphy); Computer science; Human–computer interaction; Systems engineering; Operations management; Database; Operating system; Geology","score_opus":0.021914974288020417,"score_gpt":0.24152913631094464,"score_spread":0.21961416202292422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399204586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42059872,0.000122045996,0.5782668,0.00042026577,0.00033479786,0.00017684368,0.0000148392155,0.000034042492,0.00003168354],"genre_scores_gemma":[0.9935231,0.00016705148,0.0062472317,0.000021562226,0.000015741798,0.000012084623,0.0000060710267,0.000004018124,0.0000031048203],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984976,0.000057782443,0.0010817599,0.000050085524,0.00020437477,0.000108397486],"domain_scores_gemma":[0.9992106,0.00015624092,0.00027745654,0.00012067272,0.00021893591,0.000016126964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007765777,0.00011916931,0.00020793696,0.0007988749,0.000041429303,0.00004294429,0.0001228465,0.00016577035,0.000009687018],"category_scores_gemma":[0.00022001074,0.00008145824,0.000044452496,0.0007467777,0.00025201243,0.0016340688,0.000020952617,0.00040620303,0.0000013720672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011442304,0.000003162991,0.00009387731,0.00006702932,0.000024235063,4.9113993e-7,0.005230038,0.8650106,0.0043889377,0.033090714,0.00005507048,0.09192142],"study_design_scores_gemma":[0.0006744695,0.00022840904,0.00009319863,0.00037738535,0.000021136584,0.0001439942,0.020514447,0.9228922,0.04972514,0.0042008557,0.0010082078,0.00012053432],"about_ca_topic_score_codex":0.00003052229,"about_ca_topic_score_gemma":0.000038039627,"teacher_disagreement_score":0.57292444,"about_ca_system_score_codex":0.00021857118,"about_ca_system_score_gemma":0.00007967056,"threshold_uncertainty_score":0.33217704},"labels":[],"label_agreement":null},{"id":"W4399293667","doi":"10.1080/09537287.2024.2360581","title":"From process-based to technology-driven: a study on functionalities as key elements of collaborative planning methods for construction projects","year":2024,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Process (computing); Process management; Key (lock); Knowledge management; Computer science; Project planning; Control (management); Project management; Engineering; Systems engineering","score_opus":0.022065475977545608,"score_gpt":0.34755955177335573,"score_spread":0.32549407579581013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399293667","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5510178,0.0008012256,0.4383113,0.0008091914,0.0045067943,0.0028895808,0.00016334259,0.0011160524,0.0003847256],"genre_scores_gemma":[0.9722628,0.0000011111019,0.025612589,0.000038078637,0.00045293683,0.0014780982,0.00004911282,0.00003758823,0.00006766528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.998571,0.00007979977,0.00046144007,0.00046802545,0.00021804617,0.00020169445],"domain_scores_gemma":[0.99905264,0.00018215504,0.00010248221,0.0001890552,0.00042882707,0.000044857145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034959824,0.00023479536,0.00030312108,0.00068815914,0.00014166288,0.00008014039,0.00008968937,0.000120318095,0.000022157143],"category_scores_gemma":[0.00034248398,0.00022800012,0.000047876652,0.0008353146,0.00006359752,0.00020727293,0.0000061452156,0.00023049448,0.000011365384],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027597793,0.00037195627,0.03292356,0.0007895072,0.0022768634,0.000009986974,0.023539402,0.58901,0.14724264,0.008573465,0.0038272664,0.18867557],"study_design_scores_gemma":[0.006898795,0.0062360573,0.0032125018,0.0028942875,0.0010297395,0.00005973867,0.12771042,0.22306694,0.56519836,0.017857539,0.044043615,0.0017919819],"about_ca_topic_score_codex":0.000006387501,"about_ca_topic_score_gemma":0.0000013866478,"teacher_disagreement_score":0.42124504,"about_ca_system_score_codex":0.000115934105,"about_ca_system_score_gemma":0.00015436456,"threshold_uncertainty_score":0.92975754},"labels":[],"label_agreement":null},{"id":"W4399301147","doi":"10.3390/su16114718","title":"An Integrated Building Information Modeling and Life-Cycle Assessment Approach to Facilitate Design Decisions on Sustainable Building Projects in Canada","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Building information modeling; Life-cycle assessment; Building design; Sustainable design; Process management; Sustainability; Systems engineering; Architectural engineering; Construction engineering; Environmental resource management; Engineering; Computer science; Environmental planning; Business; Management science; Environmental science; Operations management; Economics","score_opus":0.02134393565045404,"score_gpt":0.2531024576235366,"score_spread":0.23175852197308258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399301147","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46283874,0.000040970095,0.53588474,0.00007896487,0.00009850819,0.00062646874,0.0000070329124,0.00014549652,0.00027906292],"genre_scores_gemma":[0.9827422,0.0000066423686,0.01692209,0.000034736287,0.000016176497,0.0002349835,0.000014438544,0.000016235519,0.000012518063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985068,0.000111489244,0.00041352765,0.0003040975,0.00024084737,0.00042325608],"domain_scores_gemma":[0.9990591,0.00013532671,0.000016602382,0.0002432361,0.00036323644,0.00018248879],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007890664,0.00020726972,0.00018691394,0.000419255,0.00013530023,0.0002839898,0.000117738935,0.00007929614,0.0000049318724],"category_scores_gemma":[0.00052771345,0.00019397606,0.000025308158,0.000800233,0.000019802877,0.0010962043,0.00003283021,0.0003662014,6.1501225e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024107658,0.0000143262105,0.00025630384,0.00027143865,0.000009606426,0.000003990823,0.0013617357,0.93202496,0.000025477868,0.020452725,0.000069286085,0.045486048],"study_design_scores_gemma":[0.00012923327,0.00005016989,0.0007564299,0.000054163957,0.0000062715844,0.0000031660118,0.025502214,0.96505845,0.00005612007,0.0075392653,0.0006422901,0.00020225017],"about_ca_topic_score_codex":0.23919614,"about_ca_topic_score_gemma":0.02270044,"teacher_disagreement_score":0.5199034,"about_ca_system_score_codex":0.0056828847,"about_ca_system_score_gemma":0.002720822,"threshold_uncertainty_score":0.99813414},"labels":[],"label_agreement":null},{"id":"W4399398557","doi":"10.46254/an14.20240131","title":"Duration Estimation of Steel Framing Activities Using an Artificial Intelligent Algorithm and Top Risk Scores for High-Rise Buildings","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Framing (construction); Computer science; Top-down and bottom-up design; Algorithm; Artificial intelligence; Engineering; Structural engineering","score_opus":0.01509492028766787,"score_gpt":0.2526136799656671,"score_spread":0.2375187596779992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399398557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47379082,0.00011646521,0.52558476,0.000004927274,0.00030347676,0.00008018531,0.000013356658,0.00009153906,0.000014439262],"genre_scores_gemma":[0.88962954,0.000035543322,0.11016775,0.0000015965687,0.00011400222,0.000013198762,0.00001222791,0.000012884672,0.00001326358],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995244,0.000010147082,0.00020814534,0.00011167463,0.0000713158,0.000074328535],"domain_scores_gemma":[0.9998108,0.000051839535,0.000029350613,0.000054437416,0.000031796502,0.000021788297],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009998233,0.00008205276,0.00008604006,0.00012966627,0.00006276462,0.00011264162,0.000021014372,0.000061918705,0.000020336694],"category_scores_gemma":[0.00001537562,0.00007711754,0.000023220131,0.00008675846,0.00003053006,0.00049158774,0.0000051758884,0.000065438,5.2358405e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006247278,0.0000071049644,0.00003141711,0.00010624818,0.000025160287,1.6170041e-7,0.0007231315,0.044189617,0.033063594,0.019887222,0.000015320566,0.90194476],"study_design_scores_gemma":[0.000027947666,0.000030288487,0.000055629465,0.000041628722,0.000027497632,0.0000034400912,0.00059727306,0.74462956,0.25000882,0.0044697896,0.00004346569,0.00006467099],"about_ca_topic_score_codex":0.00013275367,"about_ca_topic_score_gemma":0.000031225598,"teacher_disagreement_score":0.9018801,"about_ca_system_score_codex":0.000041776864,"about_ca_system_score_gemma":0.00001509199,"threshold_uncertainty_score":0.3144762},"labels":[],"label_agreement":null},{"id":"W4399422117","doi":"10.15554/pcij68.2-ps1","title":"Project Spotlight: 11 Hoyt makes complex facade panel design look easy","year":2023,"lang":"en","type":"article","venue":"PCI Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facade; Panel data; Architectural engineering; Engineering; Computer science; Civil engineering; Economics; Econometrics","score_opus":0.10319363257269198,"score_gpt":0.265454781484379,"score_spread":0.16226114891168703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399422117","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44032466,0.0010631373,0.5203434,0.0015837926,0.0065327613,0.00080977875,0.000050117764,0.003331084,0.02596126],"genre_scores_gemma":[0.99378085,0.00030435753,0.003615953,0.00006379422,0.00076652755,0.000012007021,0.0000091714855,0.00004492753,0.0014023868],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992128,0.000042671294,0.00022787983,0.000088597684,0.00018904828,0.00023899757],"domain_scores_gemma":[0.99972975,0.000031035055,0.000040671144,0.000080393394,0.000047801204,0.00007035051],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001885741,0.00012133871,0.000120372766,0.00020712985,0.0001444902,0.00011526247,0.00011869746,0.00007669328,0.0002732697],"category_scores_gemma":[0.000016924072,0.0001031791,0.00006968775,0.00027444234,0.000027855916,0.00016259741,0.000009637116,0.00030467295,0.0003264567],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000096348274,0.00006273689,0.01752259,0.00020924544,0.00044538474,0.00035880785,0.0038554023,0.08026597,0.088686615,0.0092942435,0.505029,0.29417363],"study_design_scores_gemma":[0.0024404458,0.00021865258,0.0682343,0.00031927004,0.00014119403,0.0072504412,0.004343828,0.35401052,0.025103504,0.010258204,0.52624685,0.0014328104],"about_ca_topic_score_codex":0.0000069407124,"about_ca_topic_score_gemma":0.000006946398,"teacher_disagreement_score":0.5534562,"about_ca_system_score_codex":0.000055219036,"about_ca_system_score_gemma":0.00004132187,"threshold_uncertainty_score":0.4207522},"labels":[],"label_agreement":null},{"id":"W4399931390","doi":"10.1016/j.jcsr.2024.108850","title":"Novel steel connection for modular houses in indigenous communities: An experimental study","year":2024,"lang":"en","type":"article","venue":"Journal of Constructional Steel Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Indigenous; Connection (principal bundle); Modular design; Structural engineering; Engineering; Architectural engineering; Forensic engineering; Civil engineering; Computer science","score_opus":0.08295323201204334,"score_gpt":0.36855344861338496,"score_spread":0.2856002166013416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399931390","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.991624,0.0012736842,0.0045346217,0.000030164765,0.0016425598,0.00044724866,0.000031771982,0.000061092855,0.0003548561],"genre_scores_gemma":[0.9981709,0.00005409003,0.0011377566,0.0000047082403,0.00047521887,0.00006908816,0.0000065090617,0.000031985124,0.000049756396],"study_design_codex":"bench_or_experimental","study_design_gemma":"qualitative","domain_scores_codex":[0.9982991,0.00014004779,0.00053101144,0.00011632686,0.0006547073,0.0002587564],"domain_scores_gemma":[0.99891746,0.00032439837,0.000046402758,0.00012894964,0.0004883689,0.00009441031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011910858,0.00013213044,0.00021360951,0.00095944776,0.00021579103,0.00023278089,0.00020153541,0.00010110647,0.00010236388],"category_scores_gemma":[0.00002748395,0.00012391622,0.00009074253,0.00043397557,0.00016828801,0.00068458513,0.000021368727,0.00075749384,0.000004104025],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002521087,0.0055278786,0.023755968,0.0008783612,0.0020386695,0.00021121309,0.07508156,0.13223392,0.4552755,0.111178175,0.0020975356,0.18920012],"study_design_scores_gemma":[0.011380703,0.012198343,0.036296647,0.0012003431,0.0001300615,0.010496497,0.68927747,0.14854059,0.04926229,0.010850579,0.028940769,0.0014257443],"about_ca_topic_score_codex":0.00014105713,"about_ca_topic_score_gemma":0.00030058133,"teacher_disagreement_score":0.6141959,"about_ca_system_score_codex":0.00044989138,"about_ca_system_score_gemma":0.00027759583,"threshold_uncertainty_score":0.50531566},"labels":[],"label_agreement":null},{"id":"W4400013764","doi":"10.18280/jesa.570316","title":"Comparing the Effectiveness of PERT and CPM Techniques in a House Construction Project: A Case Study","year":2024,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Computer science; Operations research; Engineering management","score_opus":0.017988036804117844,"score_gpt":0.2614580457719381,"score_spread":0.24347000896782026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400013764","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9928459,0.0013712173,0.003988133,0.0000046948808,0.00043620908,0.0004359664,0.0000017303435,0.00043756835,0.0004785945],"genre_scores_gemma":[0.998847,0.00009803514,0.00091171276,0.0000012220204,0.0000669813,0.00003872562,1.7507757e-7,0.000030614283,0.000005503437],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989077,0.0003685427,0.0003625883,0.00010962919,0.00013423289,0.0001172977],"domain_scores_gemma":[0.99956983,0.00017866507,0.00004958167,0.00009653447,0.00007894426,0.000026438593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008172599,0.00012982827,0.00021651419,0.0002932154,0.00010334316,0.0002072699,0.000065227774,0.00004338569,0.0000039521738],"category_scores_gemma":[0.000048876675,0.00008854228,0.000044036326,0.00036448322,0.00010484112,0.00026982377,0.000021261674,0.00031643547,0.0000013707752],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007208971,0.00010917041,0.11813882,0.0024989194,0.0004031725,0.0027028164,0.012427403,0.0012270781,0.008121515,0.0036230392,0.00015883212,0.85051715],"study_design_scores_gemma":[0.0011120801,0.0006066189,0.52652866,0.0045366585,0.00022335656,0.19650052,0.021721426,0.23892792,0.0056380783,0.003407283,0.00027438108,0.0005230453],"about_ca_topic_score_codex":0.00023828034,"about_ca_topic_score_gemma":0.00014457841,"teacher_disagreement_score":0.8499941,"about_ca_system_score_codex":0.00012136686,"about_ca_system_score_gemma":0.000041211348,"threshold_uncertainty_score":0.36106494},"labels":[],"label_agreement":null},{"id":"W4400058454","doi":"10.4236/ojce.2024.142009","title":"An Integrated Building Information Modeling (BIM) and Circular Economy (CE) Model for the Management of Construction and Deconstruction Waste Based on Construction Methods","year":2024,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Deconstruction (building); Building information modeling; Circular economy; Construction engineering; Information model; Architectural engineering; Civil engineering; Engineering; Computer science; Waste management; Operations management; Database","score_opus":0.014173564736179983,"score_gpt":0.258368636831527,"score_spread":0.24419507209534702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400058454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029122936,0.0004855346,0.9689246,0.000033878663,0.00082974817,0.00028309785,0.000009183386,0.00004530049,0.00026576678],"genre_scores_gemma":[0.68212193,0.0001606127,0.31763136,0.0000060061525,0.00004330945,0.000016082551,0.000003651663,0.000016278123,8.004597e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999104,0.000020806385,0.00054937287,0.00011100039,0.00009663038,0.000118187025],"domain_scores_gemma":[0.9994832,0.00008205163,0.000113796574,0.000116054005,0.00014293204,0.000061922656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065924414,0.00016324873,0.000216814,0.00035066626,0.000082135266,0.00032742563,0.00012415659,0.000081149585,0.000008780718],"category_scores_gemma":[0.000012869895,0.0001361536,0.00006275583,0.00017763021,0.000044461372,0.0016216306,0.000016264261,0.00022365942,1.1270746e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024580751,0.0000019538754,0.0000067734704,0.00031331024,0.00011902561,3.2421386e-7,0.00009242461,0.76093686,0.0010402924,0.016794913,0.0000038943067,0.22066565],"study_design_scores_gemma":[0.00046038546,0.000051691884,0.000005412364,0.0005324376,0.00013743257,0.00021547753,0.0010423431,0.9921101,0.0025157533,0.0023401626,0.00045617254,0.00013266229],"about_ca_topic_score_codex":0.0000035039252,"about_ca_topic_score_gemma":0.0000016497236,"teacher_disagreement_score":0.652999,"about_ca_system_score_codex":0.00008617762,"about_ca_system_score_gemma":0.000041422416,"threshold_uncertainty_score":0.5552183},"labels":[],"label_agreement":null},{"id":"W4400096285","doi":"10.1007/978-3-031-62578-7_25","title":"On Considering a PLM Platform for Design Change Management in Construction","year":2024,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Systems engineering; Computer science; Process management; Engineering; Construction engineering","score_opus":0.021514388264688548,"score_gpt":0.24172842301291142,"score_spread":0.22021403474822288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400096285","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00026388487,0.031499006,0.07750754,0.0009369669,0.001406093,0.0037026128,0.00007069722,0.0015190489,0.88309413],"genre_scores_gemma":[0.31328878,0.47345605,0.1872553,0.0010932735,0.00016126022,0.011704251,0.0011571991,0.00029978898,0.011584074],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991442,0.0000042992456,0.000522695,0.00011878204,0.00008014161,0.00012989546],"domain_scores_gemma":[0.9994322,0.00007744212,0.00011707785,0.00031437672,0.000042294418,0.000016629156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012849404,0.00020024546,0.00020532546,0.0013975163,0.00005353727,0.000045448705,0.00015791552,0.00036819058,0.000022571285],"category_scores_gemma":[0.00001062187,0.00021997307,0.000028469876,0.00013515276,0.00014292651,0.00076661573,0.000050131537,0.00044023688,0.00003205734],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011697245,0.0000013297357,0.0000019151412,0.00012161762,0.00000910593,2.5854965e-7,0.00011040613,0.00050787575,3.9728505e-7,0.5992719,0.000028931961,0.3999346],"study_design_scores_gemma":[0.0004152838,0.000038652994,0.000002816182,0.000576839,0.000011205547,0.000022651238,0.0005723346,0.012954056,0.00005953372,0.66353387,0.321606,0.00020675338],"about_ca_topic_score_codex":0.0000015700593,"about_ca_topic_score_gemma":0.00006337422,"teacher_disagreement_score":0.8715101,"about_ca_system_score_codex":0.00018765185,"about_ca_system_score_gemma":0.000009374378,"threshold_uncertainty_score":0.89702415},"labels":[],"label_agreement":null},{"id":"W4400135921","doi":"10.18280/ijsse.140327","title":"Assembly Algorithms for Seismic Vulnerability Estimation in Confined Masonry Dwellings","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Masonry; Vulnerability (computing); Estimation; Computer science; Vulnerability assessment; Algorithm; Civil engineering; Forensic engineering; Engineering; Computer security; Systems engineering; Medicine","score_opus":0.007701791264262333,"score_gpt":0.24112411619773697,"score_spread":0.23342232493347465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400135921","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13234192,0.0014473851,0.86247516,0.0005644216,0.0028001026,0.00009245214,0.000031052783,0.00008293115,0.00016456607],"genre_scores_gemma":[0.99497133,0.0003629344,0.004371183,0.000015680358,0.0002398201,0.000004691732,0.000011587869,0.000013443841,0.000009336139],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992446,0.000007582575,0.0004113672,0.00008571125,0.00015558786,0.000095200645],"domain_scores_gemma":[0.9996261,0.00014049382,0.000034601086,0.00003524882,0.000121816964,0.000041751613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034734583,0.000101249556,0.00014024874,0.0002447937,0.000015433785,0.000087726505,0.00008901741,0.00007483604,0.000013906699],"category_scores_gemma":[0.000057913476,0.00010063933,0.00007011519,0.00008904676,0.000013676978,0.00036926952,0.0000077988825,0.00025812496,0.0000011070385],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009221858,0.000019300622,0.00006914096,0.00024097486,0.00018835261,0.00002895517,0.001159282,0.8417889,0.002655013,0.025438948,0.000114891336,0.12820405],"study_design_scores_gemma":[0.00033309974,0.00002416954,0.00033790857,0.00021808654,0.000011449844,0.00015888133,0.000052811793,0.9849524,0.0012848245,0.0031453941,0.009384735,0.000096237156],"about_ca_topic_score_codex":0.0000065790778,"about_ca_topic_score_gemma":0.0000046199198,"teacher_disagreement_score":0.8626294,"about_ca_system_score_codex":0.0001246007,"about_ca_system_score_gemma":0.000024536272,"threshold_uncertainty_score":0.41039526},"labels":[],"label_agreement":null},{"id":"W4400184649","doi":"10.1080/23744731.2024.2363104","title":"An ontology for automated fault detection &amp; diagnostics of HVAC using BIM and machine learning concepts","year":2024,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"HVAC; Ontology; Fault (geology); Fault detection and isolation; Computer science; Building information modeling; Artificial intelligence; Machine learning; Systems engineering; Engineering; Mechanical engineering; Operations management","score_opus":0.01485210876768663,"score_gpt":0.26679279868951955,"score_spread":0.25194068992183294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400184649","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7999062,0.002666532,0.1965453,0.000160042,0.00022686474,0.00021539279,0.00001231076,0.00026205962,0.0000053034328],"genre_scores_gemma":[0.9965477,0.00050899526,0.002862294,0.0000040643745,0.000012113993,0.000048021007,0.0000020470134,0.0000067305664,0.000008044613],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995726,0.0000043678215,0.00009941818,0.00014653316,0.0000581138,0.00011900971],"domain_scores_gemma":[0.9997664,0.00008580289,0.00001988263,0.00009538705,0.000015169497,0.000017334341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018498594,0.00006507059,0.000072139745,0.00014045514,0.00019890958,0.0000208618,0.00007795993,0.00008179761,0.0000030411636],"category_scores_gemma":[0.00006481499,0.00004871435,0.000011264046,0.0001534615,0.0006722073,0.00008785613,0.000020532183,0.000083846244,5.231636e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071209497,0.000009168354,0.0010161822,0.00005450682,0.000026407686,2.6231575e-7,0.00020335372,0.008252786,0.59228724,0.007995834,0.00000786844,0.39013925],"study_design_scores_gemma":[0.00011671345,0.00010997467,0.00034300712,0.000013116326,0.0000332772,0.000035990248,0.00024691687,0.91277844,0.075621,0.003157114,0.007478658,0.00006580505],"about_ca_topic_score_codex":0.000011131821,"about_ca_topic_score_gemma":0.000044131662,"teacher_disagreement_score":0.90452564,"about_ca_system_score_codex":0.000038208273,"about_ca_system_score_gemma":0.0000101129035,"threshold_uncertainty_score":0.24767756},"labels":[],"label_agreement":null},{"id":"W4400216602","doi":"10.54254/2755-2721/70/20240977","title":"Aligning building information modeling and prefabricated construction with sustainable development goals: A framework for sustainable urbanization","year":2024,"lang":"en","type":"article","venue":"Applied and Computational Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainable development; Urbanization; Construction engineering; Building information modeling; Architectural engineering; Environmental planning; Computer science; Business; Civil engineering; Engineering; Environmental science; Political science; Operations management; Economic growth; Economics","score_opus":0.003513634372817561,"score_gpt":0.17994127619075745,"score_spread":0.17642764181793988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400216602","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07306783,0.00036857653,0.9255449,0.00001934481,0.00005467881,0.0002828806,0.0000013176522,0.00044157731,0.00021885743],"genre_scores_gemma":[0.8062744,0.000010146755,0.19346456,0.00000896801,0.000040167455,0.0001244145,0.000047640468,0.000019473611,0.000010194263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935704,0.00000211554,0.00020534526,0.0001362455,0.00010299406,0.00019623239],"domain_scores_gemma":[0.9996995,0.0000688479,0.000019164441,0.000034664492,0.00013228244,0.000045545206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009581745,0.0001400768,0.0001011891,0.00022628832,0.0001538372,0.00031245555,0.000026483056,0.00007245885,0.0000017958348],"category_scores_gemma":[0.000013274162,0.00014115545,0.000010680246,0.0002900875,0.000014619809,0.00060650526,0.000014761382,0.00010596348,7.489788e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004893034,8.2752575e-7,0.000006330127,0.00035651968,0.000026760548,4.664165e-7,0.00035598085,0.53693277,0.00005713817,0.45444927,0.0000056873587,0.0078033796],"study_design_scores_gemma":[0.00017168463,0.000011266261,0.00004887732,0.00010193976,0.000018199995,0.000029158355,0.0015805227,0.97519225,0.00037447532,0.020551117,0.00173994,0.00018059155],"about_ca_topic_score_codex":0.000003344945,"about_ca_topic_score_gemma":1.2115409e-7,"teacher_disagreement_score":0.7332066,"about_ca_system_score_codex":0.00009629622,"about_ca_system_score_gemma":0.000047464728,"threshold_uncertainty_score":0.5756152},"labels":[],"label_agreement":null},{"id":"W4400235025","doi":"10.11159/iccste24.171","title":"Life Cycle Analysis of Light Weight Artificial Aggregates for Sustainable Construction","year":2024,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.008083448909523405,"score_gpt":0.2096009281644817,"score_spread":0.2015174792549583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99518645,0.00018842985,0.0022303753,0.00044375774,0.00067799893,0.00016841154,0.00008741522,0.000109323955,0.00090782164],"genre_scores_gemma":[0.9993631,0.000055357068,0.00040716678,0.0000059841786,0.00006630857,0.00002406598,0.000026379192,0.000011574538,0.00004003992],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992669,8.907485e-7,0.00031070653,0.00014186848,0.00017584288,0.00010379337],"domain_scores_gemma":[0.9995253,0.000025931868,0.000066474706,0.00003380532,0.00030851734,0.00003994757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000055250188,0.00012388632,0.00016526705,0.00030810255,0.00003975019,0.000073648276,0.00011545625,0.000057747668,0.00006850568],"category_scores_gemma":[0.000030276471,0.00009676497,0.00012164751,0.0003751101,0.000038782106,0.0003060147,0.0000038767344,0.00009718758,2.1673705e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003203383,0.000003341623,0.001041416,0.00038395886,0.0006350507,2.1416241e-7,0.0004020393,0.01985894,0.043741576,0.93069035,0.000040711213,0.0031703655],"study_design_scores_gemma":[0.0001790741,0.00003678402,0.011692985,0.00023408417,0.00045484985,0.0000036830975,0.00080298074,0.8553364,0.11221141,0.018264236,0.0005713891,0.00021211643],"about_ca_topic_score_codex":0.000012600234,"about_ca_topic_score_gemma":0.00001723778,"teacher_disagreement_score":0.9124261,"about_ca_system_score_codex":0.000027715385,"about_ca_system_score_gemma":0.000021549977,"threshold_uncertainty_score":0.3945961},"labels":[],"label_agreement":null},{"id":"W4400235038","doi":"10.11159/iccste24.145","title":"Integration of 4D BIM, PtD and databases to improve OHS and knowledge management in construction","year":2024,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Database; Building information modeling; Construction engineering; Engineering; Operations management","score_opus":0.013557192874358815,"score_gpt":0.23329106166221267,"score_spread":0.21973386878785386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99621636,0.0001637737,0.0018694492,0.00012621428,0.00053289096,0.00016361444,0.000057315312,0.000046578403,0.0008237912],"genre_scores_gemma":[0.9975412,0.000190026,0.002187969,0.0000042821953,0.000025552481,0.000018852037,0.000010048829,0.000008505536,0.000013559671],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942833,0.0000011956791,0.00023552166,0.00015330031,0.00011382706,0.000067836074],"domain_scores_gemma":[0.9998155,0.00001576913,0.000030812265,0.000028628441,0.000080888574,0.000028392556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005258171,0.00011513381,0.000104625404,0.00022484566,0.000020715694,0.00005615215,0.000063820225,0.000031223528,0.000010108857],"category_scores_gemma":[0.000007707438,0.00009173935,0.000019725214,0.00015488439,0.00004738747,0.00027519133,0.000009790614,0.00010734612,1.5986005e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019924775,0.0000027968997,0.0013094955,0.00040835372,0.000046887377,2.790769e-7,0.00068272307,0.0004980125,0.10155268,0.85646194,0.0000048823676,0.039012],"study_design_scores_gemma":[0.000919342,0.00012505829,0.22098354,0.0029651115,0.00011716142,0.000044549164,0.0036481926,0.5706821,0.18337165,0.016085075,0.000489164,0.0005690609],"about_ca_topic_score_codex":0.000021545304,"about_ca_topic_score_gemma":0.00008645628,"teacher_disagreement_score":0.8403769,"about_ca_system_score_codex":0.000022431892,"about_ca_system_score_gemma":0.000007105927,"threshold_uncertainty_score":0.3741022},"labels":[],"label_agreement":null},{"id":"W4400235337","doi":"10.11159/iccste24","title":"Proceedings of the 9th International Conference on Civil, Structural and Transportation Engineering (ICCSTE 2024)","year":2024,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Construction engineering; Engineering management; Computer science; Civil engineering; Engineering ethics; Transport engineering","score_opus":0.013032088030389206,"score_gpt":0.21971930163711964,"score_spread":0.20668721360673042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235337","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9567074,0.00042159535,0.00014383825,0.0009635961,0.020000443,0.0010054182,0.001810883,0.00021742088,0.018729378],"genre_scores_gemma":[0.9952823,0.0005324427,0.00023104384,0.000024197469,0.00033189106,0.00008941743,0.0001485873,0.000077511904,0.0032826075],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997421,0.0000028914762,0.0008854827,0.00055028225,0.0008464985,0.00029381958],"domain_scores_gemma":[0.99869865,0.000037652593,0.00038500238,0.00010693817,0.000672297,0.000099475656],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010637666,0.0006527543,0.00050641905,0.00039752544,0.00010047115,0.0002658518,0.00069397024,0.00033094382,0.00052490947],"category_scores_gemma":[0.000027286933,0.00048288793,0.00022934962,0.0003434153,0.00014569193,0.0005327529,0.00002788916,0.0009796157,0.0000065212053],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000326079,0.000032922024,0.0030287637,0.0056452393,0.0017485836,0.0000030694027,0.0045269234,0.036428697,0.19732314,0.7383331,0.007868635,0.0047348244],"study_design_scores_gemma":[0.0035717627,0.0005099935,0.08725186,0.018560097,0.001170693,0.00020598187,0.0031950863,0.7110683,0.13819565,0.013171529,0.01899,0.0041090553],"about_ca_topic_score_codex":0.000041311032,"about_ca_topic_score_gemma":0.00008593268,"teacher_disagreement_score":0.7251616,"about_ca_system_score_codex":0.00012727079,"about_ca_system_score_gemma":0.000057475267,"threshold_uncertainty_score":0.9997623},"labels":[],"label_agreement":null},{"id":"W4400286660","doi":"10.3390/rs16132445","title":"Simulation-Based Optimization of Path Planning for Camera-Equipped UAVs That Considers the Location and Time of Construction Activities","year":2024,"lang":"en","type":"article","venue":"Remote Sensing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Zoom; Data collection; Path (computing); Field (mathematics); Computer vision; Motion planning; Real-time computing; Artificial intelligence; Robot; Engineering","score_opus":0.01455757268905029,"score_gpt":0.23367140653501914,"score_spread":0.21911383384596886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400286660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09618259,0.0003115177,0.90277296,0.000052295814,0.0002546888,0.00016691764,0.0000067500937,0.000093571245,0.00015868495],"genre_scores_gemma":[0.9761377,0.000010288475,0.023762377,0.00000945366,0.000039205595,9.102261e-8,0.000017466413,0.00001556678,0.00000782386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995607,0.00002368224,0.00017293173,0.000089437424,0.00008371718,0.00006950175],"domain_scores_gemma":[0.9992232,0.0005449061,0.00005869276,0.0000743283,0.000086364074,0.000012523688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009985836,0.00008110775,0.00011010767,0.000100657366,0.0000590279,0.00003358324,0.000014495933,0.00006056133,0.0000040901255],"category_scores_gemma":[0.000055677203,0.00007040271,0.000032212705,0.00013183829,0.00010163265,0.00012313307,0.000002826752,0.00005911138,2.4091676e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000118849175,6.087582e-7,0.000010089048,0.00016639473,0.000025196601,1.6303028e-7,0.0004391543,0.93266386,0.0072157867,0.00021276817,0.000011617419,0.059242457],"study_design_scores_gemma":[0.00012239844,0.000014223025,0.000011759251,0.00032087168,0.00003954523,0.000006921735,0.0007832375,0.9793759,0.01887697,0.0003424433,0.000040277497,0.00006543252],"about_ca_topic_score_codex":0.000013552108,"about_ca_topic_score_gemma":0.0000011628293,"teacher_disagreement_score":0.8799551,"about_ca_system_score_codex":0.000030921652,"about_ca_system_score_gemma":0.000039558206,"threshold_uncertainty_score":0.28709394},"labels":[],"label_agreement":null},{"id":"W4400322366","doi":"10.3390/buildings14072041","title":"Factor Analysis for In Situ Reinforced Concrete Beam Production: A Principal Component Analysis Approach","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"EllisDon (Canada)","funders":"","keywords":"Principal component analysis; Ranking (information retrieval); Production (economics); Beam (structure); Productivity; Principal (computer security); Duration (music); Engineering; Environmental science; Mathematics; Structural engineering; Statistics; Computer science; Economics; Artificial intelligence; Economic growth","score_opus":0.014947815558178501,"score_gpt":0.23183733428323708,"score_spread":0.21688951872505857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400322366","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78445756,0.00023844861,0.21341361,0.00006542546,0.00033652099,0.0002642614,0.000020008736,0.00034671827,0.00085741316],"genre_scores_gemma":[0.9946815,0.000017760301,0.004413121,0.0000096797785,0.0001376243,0.00013457895,0.000106373605,0.000016318849,0.00048306945],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907506,0.000008750449,0.00030242928,0.00029166305,0.00014178349,0.00018029312],"domain_scores_gemma":[0.9996728,0.00002698547,0.000027053502,0.00017470759,0.00005052661,0.000047956706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013611179,0.00014476072,0.00027832997,0.00084750855,0.00004264801,0.00010428334,0.00008379614,0.000087999884,0.000046258177],"category_scores_gemma":[0.00001837032,0.00013768394,0.00029788472,0.0022450117,0.000026674115,0.00017830085,0.000011629395,0.00013796732,0.0000052545606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000062561834,0.0000069521507,0.0067458884,0.00052546593,0.009505164,0.000004168942,0.0029231873,0.7627361,0.18644197,0.022780022,0.00085046125,0.0074180723],"study_design_scores_gemma":[0.00022350418,0.000022742388,0.004844442,0.000025260812,0.0018156841,0.0000075459375,0.00026413117,0.9416938,0.038416747,0.000045229775,0.012283487,0.00035744082],"about_ca_topic_score_codex":0.000038008282,"about_ca_topic_score_gemma":0.000029215955,"teacher_disagreement_score":0.21022388,"about_ca_system_score_codex":0.00014196333,"about_ca_system_score_gemma":0.000016802587,"threshold_uncertainty_score":0.56145877},"labels":[],"label_agreement":null},{"id":"W4400423841","doi":"10.3390/buildings14072084","title":"Development of a Cloud-Based Building Information Modeling Design Configurator to Auto-Link Material Catalogs with Code-Compliant Designs of Residential Buildings","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Configurator; Systems engineering; Modular design; Computer science; Cloud computing; Software engineering; Supply chain; Certification; Building information modeling; Personalization; Engineering; Database; World Wide Web; Operating system","score_opus":0.02232136015867906,"score_gpt":0.2322101694418897,"score_spread":0.20988880928321066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400423841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36911952,0.000032996704,0.6297268,0.00004768142,0.00047274254,0.00027332472,0.00003437313,0.00023889425,0.000053606676],"genre_scores_gemma":[0.7450688,0.0000022120578,0.25470895,0.00002328739,0.000078014375,0.00005524432,0.000027441443,0.000031233576,0.0000048384204],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9983638,0.000020453896,0.00078334584,0.00021273324,0.00034984644,0.00026981585],"domain_scores_gemma":[0.99936914,0.000042845164,0.00010254514,0.00017272196,0.00021544608,0.00009727693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037104328,0.00025017394,0.00029914183,0.00046258114,0.00008692248,0.00015507262,0.00020052935,0.00013074062,0.000049382787],"category_scores_gemma":[0.00002639849,0.00023254918,0.000060474158,0.00045424377,0.000045071884,0.00050818466,0.000025241592,0.00014311064,0.000013976729],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024506767,0.000010322399,0.000010920331,0.000638221,0.00010902,0.0000030116405,0.0021954933,0.28422195,0.6851582,0.009835414,0.00062748697,0.016944923],"study_design_scores_gemma":[0.00030730636,0.00006730766,0.000016823731,0.00068520714,0.000042879787,0.000016132713,0.0001505149,0.3430427,0.651745,0.0001556323,0.0035156049,0.00025484007],"about_ca_topic_score_codex":0.000073405885,"about_ca_topic_score_gemma":0.000010288146,"teacher_disagreement_score":0.37594923,"about_ca_system_score_codex":0.00017659078,"about_ca_system_score_gemma":0.00029912006,"threshold_uncertainty_score":0.94830805},"labels":[],"label_agreement":null},{"id":"W4400447231","doi":"10.2139/ssrn.4890093","title":"Integrated Fuzzy System Dynamics–Fuzzy Agent-Based Modeling of Construction Crew Motivation and Productivity","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Productivity; Fuzzy logic; Computer science; Dynamics (music); Engineering; Artificial intelligence; Economics; Aeronautics; Psychology; Economic growth","score_opus":0.008824091317364202,"score_gpt":0.20140401590620602,"score_spread":0.19257992458884182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400447231","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6524854,0.004441789,0.33780777,0.00013086115,0.002730566,0.00034632406,0.000049162976,0.0003736183,0.0016345348],"genre_scores_gemma":[0.9978408,0.0007275756,0.00089644524,0.0000018754204,0.00031737515,0.000024264533,0.00008081812,0.000062369436,0.000048451082],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99784595,0.00009899209,0.00066509395,0.0003621536,0.00028321284,0.00074459723],"domain_scores_gemma":[0.99913055,0.000022558095,0.0002305676,0.00023249949,0.00031980136,0.00006400284],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00085438485,0.00035848832,0.00041435714,0.0004891922,0.00010492852,0.00013516335,0.00014550943,0.00037024528,0.0000035105397],"category_scores_gemma":[0.000043884873,0.0003418592,0.00016281522,0.00027220484,0.00007866516,0.00013847738,0.000057754016,0.0040155835,0.000003262771],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007241856,0.000026864758,0.0005189272,0.0017950177,0.0007436465,0.0000025918193,0.00014883267,0.46724513,0.0014482823,0.39328286,0.000016413827,0.13469902],"study_design_scores_gemma":[0.00023837425,0.000051410752,0.000024997944,0.00078380824,0.00018089853,0.00043797598,0.0022135752,0.83994585,0.00041825935,0.1554313,0.0000072714183,0.00026627784],"about_ca_topic_score_codex":0.00014984257,"about_ca_topic_score_gemma":0.0004774379,"teacher_disagreement_score":0.37270072,"about_ca_system_score_codex":0.0029924372,"about_ca_system_score_gemma":0.0015131765,"threshold_uncertainty_score":0.9999033},"labels":[],"label_agreement":null},{"id":"W4400564300","doi":"10.4236/ojce.2024.143015","title":"A Building Information Modeling-Life Cycle Cost Analysis Integrated Model to Enhance Decisions Related to the Selection of Construction Methods at the Conceptual Design Stage of Buildings","year":2024,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Life-cycle cost analysis; Modular design; Systems engineering; Engineering; Process (computing); Conceptual design; Product life-cycle management; Building design; Computer science; Risk analysis (engineering); Process management; Construction engineering; Architectural engineering; Operations management; Reliability engineering; Business","score_opus":0.02201787690699258,"score_gpt":0.3084261894161085,"score_spread":0.2864083125091159,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400564300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15743367,0.00018029791,0.8414099,0.00010624643,0.0003937398,0.00030222398,0.000018356004,0.000037289905,0.000118245174],"genre_scores_gemma":[0.82094574,0.00005509835,0.17889385,0.000015537798,0.000018992829,0.000021392983,0.0000024114963,0.00001727166,0.000029705996],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840444,0.00007781283,0.00096425804,0.00010909005,0.0002861841,0.00015822735],"domain_scores_gemma":[0.99884236,0.00026190124,0.00018215277,0.00016570126,0.0004439716,0.0001038896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015099423,0.00016513196,0.00034441613,0.0006120895,0.000090344314,0.00014951201,0.0003631459,0.00008807091,0.000098704775],"category_scores_gemma":[0.00045224198,0.000113572074,0.00015757818,0.0021354111,0.000031675256,0.0008427315,0.00006713796,0.0003689096,0.0000026191917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004208551,0.000002996507,0.000006200061,0.000015275056,0.0003683042,2.0054428e-7,0.0011262936,0.93058765,0.03786863,0.0030400415,0.00015294836,0.026789354],"study_design_scores_gemma":[0.00010288782,0.000048063335,0.000010890572,0.00022320436,0.00019419915,0.00003073451,0.0005758453,0.9586521,0.03869542,0.00013578932,0.0012198255,0.00011106025],"about_ca_topic_score_codex":0.000033961056,"about_ca_topic_score_gemma":0.000051464645,"teacher_disagreement_score":0.66351205,"about_ca_system_score_codex":0.00021910002,"about_ca_system_score_gemma":0.000120870995,"threshold_uncertainty_score":0.46313348},"labels":[],"label_agreement":null},{"id":"W4400607694","doi":"10.1680/jfoen.2024.177.3.73","title":"Editorial: Themed issue on reuse of foundations and structures","year":2024,"lang":"en","type":"editorial","venue":"Proceedings of the Institution of Civil Engineers - Forensic Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reuse; Computer science; Engineering; Waste management","score_opus":0.0045611487871670305,"score_gpt":0.20428825809958115,"score_spread":0.1997271093124141,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400607694","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031939496,0.0007757438,0.00050192483,0.000041284315,0.9921596,0.0003333524,0.00017809332,0.00028189714,0.0025341506],"genre_scores_gemma":[0.28587058,0.000599318,0.001487663,0.0000025112306,0.71166056,0.000054530687,0.000048977843,0.00014355157,0.00013229647],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99809045,0.0000027121446,0.0006936577,0.00025638775,0.00074136676,0.00021542642],"domain_scores_gemma":[0.9987457,0.00014679533,0.00022747363,0.00027423998,0.0005442644,0.0000615373],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020169465,0.0004172544,0.0005510049,0.0004863891,0.000044294593,0.00004183054,0.00043048649,0.00062200846,0.000010373801],"category_scores_gemma":[0.0008537547,0.00034574818,0.00020213392,0.00049339706,0.00021637393,0.00023188694,0.00009942516,0.0008355893,0.000001384434],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019851417,0.000009831966,0.0000027753206,0.0031247153,0.0002671066,1.2346804e-7,0.0003846831,0.051454216,0.006787863,0.03348645,0.9037334,0.0007290205],"study_design_scores_gemma":[0.0005003906,0.00011838316,0.000019353025,0.0028825758,0.0003709582,0.000006325265,0.00013070327,0.015589501,0.051839206,0.0025493358,0.9254616,0.00053168886],"about_ca_topic_score_codex":0.00002258956,"about_ca_topic_score_gemma":0.000008972389,"teacher_disagreement_score":0.28267664,"about_ca_system_score_codex":0.00014017404,"about_ca_system_score_gemma":0.00009412026,"threshold_uncertainty_score":0.99989945},"labels":[],"label_agreement":null},{"id":"W4400922350","doi":"10.51967/tepian.v4i4.2969","title":"Critical Path Analysis Using Microsoft Project 2016 on the Implementation Schedule of Residential House Construction Projects","year":2023,"lang":"en","type":"article","venue":"TEPIAN","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kwantlen Polytechnic University","funders":"","keywords":"Schedule; Critical path method; Computer science; Path (computing); Transport engineering; Architectural engineering; Operations research; Engineering; Operating system; Systems engineering","score_opus":0.027037871511802862,"score_gpt":0.30832112155000974,"score_spread":0.28128325003820687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400922350","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9931465,0.000016268785,0.0054918453,0.000102041544,0.0003502347,0.0002210704,0.000036638772,0.00032497972,0.0003104244],"genre_scores_gemma":[0.9985209,0.000012147828,0.0012910936,0.000013411054,0.00008623538,0.000022366998,0.000019387931,0.000018030756,0.000016422653],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992862,0.00005165237,0.00022792857,0.00012629904,0.00015733388,0.00015060819],"domain_scores_gemma":[0.99966127,0.000050055616,0.000041514544,0.00015571767,0.00007234774,0.000019117186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016369295,0.00008990722,0.0001151891,0.00033186254,0.00010607844,0.000046282432,0.00006093118,0.000053915057,0.00009704877],"category_scores_gemma":[0.000042636915,0.00007042365,0.000083015046,0.0009659808,0.00008441863,0.00012855517,0.000010932654,0.00009615436,0.000024853472],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016625904,0.000108085274,0.047123738,0.0004526533,0.0020999915,0.000017478953,0.0073883818,0.010385097,0.7139063,0.14118406,0.017459325,0.05970863],"study_design_scores_gemma":[0.0018372604,0.00032409746,0.052379474,0.00030276162,0.0019234599,0.00006757226,0.03248994,0.21604188,0.68858904,0.003455485,0.0015109929,0.0010780181],"about_ca_topic_score_codex":0.00016907018,"about_ca_topic_score_gemma":0.000120555866,"teacher_disagreement_score":0.20565678,"about_ca_system_score_codex":0.000047649923,"about_ca_system_score_gemma":0.000053832657,"threshold_uncertainty_score":0.28717932},"labels":[],"label_agreement":null},{"id":"W4400963000","doi":"10.34925/eip.2023.153.4.221","title":"ECONOMIC JUSTIFICATION FOR RENOVATION SERVICES OF A TYPICAL QUARTER","year":2023,"lang":"ru","type":"article","venue":"Экономика и предпринимательство","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architectural engineering; Business; Engineering; History; Archaeology","score_opus":0.012709462405520448,"score_gpt":0.2369798363234249,"score_spread":0.22427037391790444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400963000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9377848,0.00067153905,0.028745644,0.0024496212,0.019694777,0.0018085522,0.00095641863,0.0012501793,0.0066384603],"genre_scores_gemma":[0.995709,0.0001565293,0.0011469246,0.000035763525,0.0009712225,0.00020051282,0.0006630369,0.00007399631,0.0010430289],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979759,0.00003912606,0.00093887927,0.00043973702,0.00018681098,0.0004195731],"domain_scores_gemma":[0.99871284,0.00020843226,0.00029420404,0.00047687071,0.00021089705,0.000096749296],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00037964594,0.00030699366,0.0003973659,0.00042109162,0.00013493447,0.00008456841,0.00025754943,0.0003882721,0.0004169084],"category_scores_gemma":[0.000035628458,0.00034105944,0.00021168274,0.00053316046,0.000082486215,0.0003643902,0.00003007095,0.00019524222,0.0010677152],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011399379,0.00027142293,0.0073109306,0.007917006,0.0010423237,0.000003876019,0.007063781,0.02782421,0.08628931,0.45094088,0.16417558,0.24602075],"study_design_scores_gemma":[0.0034409554,0.00057172915,0.06265807,0.0007996393,0.00059012364,0.000020257157,0.0049500302,0.7166415,0.032879986,0.017656041,0.15822196,0.0015697128],"about_ca_topic_score_codex":0.00007201016,"about_ca_topic_score_gemma":0.00020455522,"teacher_disagreement_score":0.68881726,"about_ca_system_score_codex":0.00017935468,"about_ca_system_score_gemma":0.00009311837,"threshold_uncertainty_score":0.99990416},"labels":[],"label_agreement":null},{"id":"W4400989880","doi":"10.69554/ajyh5686","title":"Understanding ORAT and how ADM's ORAT programme contributes to sustainability","year":2022,"lang":"en","type":"article","venue":"Journal of airport management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Deconstruction (building); Greenhouse gas; Project commissioning; Environmental economics; Process (computing); Business; Life-cycle assessment; Operations management; Engineering; Waste management; Economics; Computer science; Publishing; Production (economics); Political science","score_opus":0.027179754418163903,"score_gpt":0.21577515318538368,"score_spread":0.18859539876721979,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400989880","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30842033,0.0011748989,0.6444725,0.034264732,0.0034259984,0.0016269193,0.000011297528,0.00023196664,0.0063713696],"genre_scores_gemma":[0.9985842,0.00003370885,0.00086505327,0.00008049419,0.000040944647,0.000024043211,0.0000015534612,0.000009357948,0.0003606256],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930465,0.000024106055,0.00020404372,0.000082569444,0.00022652258,0.00015810528],"domain_scores_gemma":[0.9996401,0.000011701998,0.000085335174,0.0000837672,0.00010266907,0.00007644248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047981477,0.000085924956,0.00014121919,0.00021373451,0.00013242458,0.00010694046,0.000086561406,0.000017551049,0.00003907018],"category_scores_gemma":[0.000016110453,0.000079493744,0.000047422756,0.00025707672,0.000021746297,0.00015357941,0.00006630879,0.00016130864,4.4265076e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004147017,0.00025621487,0.044382967,0.00092389423,0.0015785721,0.00076798775,0.0013755097,0.061991896,0.0003689748,0.40595096,0.24638481,0.23560351],"study_design_scores_gemma":[0.002403349,0.00094603864,0.011647164,0.000081809674,0.00031203733,0.00034996,0.07654651,0.006167718,0.00033445616,0.062234268,0.838434,0.0005427082],"about_ca_topic_score_codex":0.0000014748208,"about_ca_topic_score_gemma":0.000007862683,"teacher_disagreement_score":0.6901639,"about_ca_system_score_codex":0.0008331271,"about_ca_system_score_gemma":0.000025493378,"threshold_uncertainty_score":0.3241661},"labels":[],"label_agreement":null},{"id":"W4400992377","doi":"10.69554/wzxv4814","title":"Intelligent design for facility asset management","year":2007,"lang":"en","type":"article","venue":"Journal of airport management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facility management; Asset management; Asset (computer security); Business; Computer science; IT asset management; Computer security; Finance; Marketing","score_opus":0.023883279515413913,"score_gpt":0.24468006508530013,"score_spread":0.22079678556988622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400992377","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004890299,0.0001307705,0.9810106,0.00006455867,0.0012469457,0.0003606394,0.000002882395,0.000047163776,0.012246103],"genre_scores_gemma":[0.89175195,0.00042766222,0.10609823,0.00008537212,0.00019365374,0.000022918386,0.000007182145,0.00001897784,0.0013940781],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989016,0.000008661669,0.00056420907,0.00008758913,0.00025399422,0.00018392447],"domain_scores_gemma":[0.99954724,0.00002173187,0.00013227828,0.0001268684,0.00009869349,0.00007317077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010676791,0.00011621287,0.00014690023,0.00024121982,0.000042035612,0.000032873304,0.00014271103,0.000039392296,0.0000681681],"category_scores_gemma":[0.000003819318,0.000103245024,0.00012946647,0.00011833462,0.000016008129,0.00013186355,0.000017715918,0.000100649944,0.000016855123],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017805224,0.000099877296,0.0005279882,0.00037689361,0.00088051084,0.00013089734,0.00011244424,0.030929726,0.00012460696,0.017805494,0.06917854,0.87965494],"study_design_scores_gemma":[0.001624738,0.00041645646,0.014206942,0.0001668117,0.00045575466,0.00015840078,0.002387609,0.0064584706,0.011819078,0.01185622,0.94991475,0.0005347587],"about_ca_topic_score_codex":4.3458425e-7,"about_ca_topic_score_gemma":0.000002052464,"teacher_disagreement_score":0.8868616,"about_ca_system_score_codex":0.00015871605,"about_ca_system_score_gemma":0.0000051989464,"threshold_uncertainty_score":0.42102098},"labels":[],"label_agreement":null},{"id":"W4401013860","doi":"10.15554/pcij60.1-ps1","title":"Project Spotlight: Precast concrete replaces cast stone at Boston College","year":2015,"lang":"en","type":"article","venue":"PCI Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Facade; Glory; Engineering; Arch; Pavilion; Forensic engineering; Civil engineering; Architectural engineering","score_opus":0.02651562424863152,"score_gpt":0.2390334027801721,"score_spread":0.21251777853154058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401013860","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9529639,0.0014223517,0.000819765,0.00023279426,0.0028558923,0.00016795841,0.00003816157,0.00021050031,0.041288696],"genre_scores_gemma":[0.99529326,0.00010089932,0.001002894,0.000029177021,0.0006070461,0.0000064047676,0.0000053950557,0.000028783614,0.0029261182],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99919087,0.000039645274,0.0002499058,0.00009945584,0.00022749093,0.00019264081],"domain_scores_gemma":[0.9995471,0.000016066726,0.00006964781,0.00011092479,0.000113557624,0.00014268442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024251697,0.00012480958,0.00014045312,0.00011230713,0.00012718046,0.00006503831,0.000088076435,0.00007943419,0.00016737753],"category_scores_gemma":[0.00003274057,0.000105741085,0.000053046606,0.00014451811,0.00003939789,0.00024477224,0.00001647775,0.00027045907,0.00009506408],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074335077,0.000022381953,0.00929697,0.00012182898,0.0004412908,0.00042331757,0.008465505,0.0037272114,0.034230858,0.0046242815,0.90897506,0.028927919],"study_design_scores_gemma":[0.0031867803,0.0004182546,0.00083574373,0.00019623595,0.00009877792,0.029421786,0.0041656606,0.025426371,0.04592622,0.000466491,0.88910663,0.00075105444],"about_ca_topic_score_codex":0.000015589854,"about_ca_topic_score_gemma":0.000039844024,"teacher_disagreement_score":0.0423294,"about_ca_system_score_codex":0.00026217135,"about_ca_system_score_gemma":0.000090550195,"threshold_uncertainty_score":0.43119964},"labels":[],"label_agreement":null},{"id":"W4401023482","doi":"10.24963/ijcai.2024/879","title":"KP-PINNs: Kernel Packet Accelerated Physics Informed Neural Networks","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada; Australian Government","keywords":"Computer science; Plan (archaeology); Geography","score_opus":0.01756495226819577,"score_gpt":0.2339171019009304,"score_spread":0.21635214963273464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401023482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21165381,0.0020167835,0.56021124,0.0004183857,0.010809308,0.0004177626,0.000019927222,0.007894193,0.20655856],"genre_scores_gemma":[0.99836195,0.000076362405,0.00016766049,0.000099282486,0.00038247972,0.000015247848,0.00003452081,0.000019110252,0.0008433969],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957097,0.0000042872116,0.0001353596,0.00008260627,0.000065705426,0.00014109364],"domain_scores_gemma":[0.9998252,0.000019844207,0.000005973196,0.000085847736,0.000026850546,0.00003630487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000019574154,0.00010263371,0.000070791924,0.000032583383,0.000027851072,0.00016142603,0.000051146722,0.00007194698,0.0004485642],"category_scores_gemma":[0.0000029852954,0.00008489684,0.000042879572,0.00026762087,0.000017099315,0.00032729705,0.000008126029,0.00017500814,0.00010457512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006905034,0.0000068243585,0.0003862991,0.00009499755,0.00011043952,0.0000062651225,0.00026918764,0.14036527,0.00055858504,0.045721393,0.086875826,0.72559804],"study_design_scores_gemma":[0.00006675195,0.000007764314,0.00020139557,0.000017006088,0.0000074097725,0.000009031419,0.00006519093,0.9863686,0.0008997465,0.0004686898,0.01177671,0.00011168072],"about_ca_topic_score_codex":0.000008373468,"about_ca_topic_score_gemma":0.00002167231,"teacher_disagreement_score":0.84600335,"about_ca_system_score_codex":0.000034945257,"about_ca_system_score_gemma":0.000014074469,"threshold_uncertainty_score":0.49114636},"labels":[],"label_agreement":null},{"id":"W4401032683","doi":"10.54254/2755-2721/72/20240986","title":"Maximizing project efficiency and collaboration in construction management through Building Information Modeling (BIM)","year":2024,"lang":"en","type":"article","venue":"Applied and Computational Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Stakeholder; Workflow; Process management; Profitability index; Project management; Business; Return on investment; Knowledge management; Computer science; Systems engineering; Engineering; Operations management","score_opus":0.005383347659076168,"score_gpt":0.2061643089723207,"score_spread":0.20078096131324452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401032683","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1369703,0.00045144607,0.8601313,0.000026374108,0.00026111476,0.00019280224,0.0000034723519,0.00028840592,0.0016747419],"genre_scores_gemma":[0.9393413,0.00009731612,0.06042873,0.000010887946,0.000034449196,0.000051932642,0.000023751923,0.000010566487,0.0000010572899],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994449,0.0000028529441,0.00021703089,0.00012095528,0.00010687418,0.000107383596],"domain_scores_gemma":[0.9998975,0.000022465458,0.00001117104,0.00003230195,0.000019638997,0.000016924558],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007022561,0.00011177908,0.0000817128,0.00026196343,0.00004826107,0.00018582644,0.000022945876,0.000048106944,0.0000014609872],"category_scores_gemma":[0.0000020717114,0.00012291547,0.000010510346,0.0003756028,0.000013154199,0.0005475878,0.00001326527,0.00010806991,0.0000018083049],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018054443,9.577994e-7,0.0000043345335,0.00014515268,0.000009369658,5.0283967e-7,0.0003305988,0.6293304,0.00015503727,0.34862143,0.0000032844455,0.021397112],"study_design_scores_gemma":[0.00018060415,0.000004481652,0.000051913416,0.00009217482,0.0000082163315,0.000025432391,0.0006324059,0.98834515,0.00008744107,0.009891311,0.0005536774,0.00012717591],"about_ca_topic_score_codex":0.000005206757,"about_ca_topic_score_gemma":8.1299373e-7,"teacher_disagreement_score":0.802371,"about_ca_system_score_codex":0.000058448382,"about_ca_system_score_gemma":0.000012880681,"threshold_uncertainty_score":0.50123477},"labels":[],"label_agreement":null},{"id":"W4401054140","doi":"10.1061/jcemd4.coeng-14764","title":"Ontology-Based Design Features for Representing Constructability in Architectural Design: Toward BIM in Off-Site Construction","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Ontology; Construction engineering; Building information modeling; Engineering; Computer science; Architectural engineering; Systems engineering","score_opus":0.013213346052477279,"score_gpt":0.22449650179262517,"score_spread":0.2112831557401479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401054140","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15250938,0.0018942013,0.8424825,0.00018812054,0.0022719807,0.0004252695,0.000004981883,0.00013449855,0.000089084984],"genre_scores_gemma":[0.78235316,0.0002474297,0.21721835,0.000008517052,0.00010599016,0.000038516107,0.0000021551677,0.000020006548,0.000005853985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998735,0.000055222758,0.00062070077,0.00020675686,0.00014959129,0.00023272017],"domain_scores_gemma":[0.9995007,0.00019478521,0.00008096192,0.0001010666,0.000061759725,0.00006072913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005881088,0.0002010356,0.00029502978,0.0009755008,0.00003187972,0.000102684266,0.00007212427,0.00011236288,0.000009149841],"category_scores_gemma":[0.00005053585,0.0001949531,0.00009632982,0.0003689602,0.000094769784,0.0002467778,0.000012150375,0.00035336692,5.0522476e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012643648,0.0000105365825,0.0012820504,0.0007748965,0.00011831572,0.000043034102,0.00021464028,0.63768226,0.0015856638,0.012017931,0.00008607641,0.34605816],"study_design_scores_gemma":[0.002358567,0.00015907326,0.010645747,0.0011505947,0.00013494221,0.0027814829,0.0008864815,0.9685835,0.004775878,0.0053179436,0.0027071298,0.0004986501],"about_ca_topic_score_codex":0.00000661501,"about_ca_topic_score_gemma":0.000010030256,"teacher_disagreement_score":0.62984383,"about_ca_system_score_codex":0.00016666311,"about_ca_system_score_gemma":0.000039897277,"threshold_uncertainty_score":0.79499567},"labels":[],"label_agreement":null},{"id":"W4401065030","doi":"10.4236/ojce.2024.143016","title":"Integrating Virtual Reality and Energy Analysis with BIM to Optimize Window-to-Wall Ratio and Building&amp;#8217;s Orientation for Age-in-Place Design at the Conceptual Stage","year":2024,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Stage (stratigraphy); Window (computing); Orientation (vector space); Conceptual design; Augmented reality; Computer science; Engineering; Human–computer interaction; Mathematics; Geometry; Geology","score_opus":0.01940961096708413,"score_gpt":0.25849754683280196,"score_spread":0.23908793586571783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401065030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11360883,0.00026915036,0.8854308,0.00017615517,0.00020739721,0.00017877646,0.000009469619,0.000024290903,0.00009513453],"genre_scores_gemma":[0.9619172,0.000049561142,0.037581164,0.000036757905,0.00007378635,0.000044610093,0.000005703796,0.000027514914,0.0002636537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911106,0.000038617818,0.00037089796,0.00016764023,0.00015324708,0.00015856308],"domain_scores_gemma":[0.9993528,0.00029488516,0.000054941327,0.00010038769,0.00008304286,0.00011394722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006378913,0.00016307863,0.00027058637,0.00030921958,0.0000697106,0.0003770028,0.00013393354,0.000047738984,0.000027366434],"category_scores_gemma":[0.00007894217,0.00011829323,0.000046154,0.0005735883,0.000025817577,0.00041295533,0.00003865728,0.0001689927,3.522837e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009627101,0.0000034437724,0.00005608116,0.000019665944,0.00022176548,0.000008984913,0.0017091947,0.97529876,0.010670914,0.007950692,0.00019811414,0.0037661279],"study_design_scores_gemma":[0.0012501403,0.000494321,0.00064177014,0.0005507443,0.00040513635,0.0001870571,0.0023922015,0.9609526,0.010503393,0.000102212005,0.022014178,0.0005062464],"about_ca_topic_score_codex":0.00005571756,"about_ca_topic_score_gemma":0.0023656848,"teacher_disagreement_score":0.84830844,"about_ca_system_score_codex":0.00014391271,"about_ca_system_score_gemma":0.00004032701,"threshold_uncertainty_score":0.48238578},"labels":[],"label_agreement":null},{"id":"W4401215821","doi":"10.3390/buildings14082374","title":"Current Research and Future Directions for Off-Site Construction through LangChain with a Large Language Model","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Current (fluid); Architectural engineering; Engineering; Systems engineering; Computer science; Construction engineering; Electrical engineering","score_opus":0.016606830352894966,"score_gpt":0.2968478723084985,"score_spread":0.28024104195560356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401215821","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6584621,0.04894202,0.28370583,0.0009303242,0.00192078,0.0006311801,0.0002964016,0.0012817038,0.0038296788],"genre_scores_gemma":[0.9532186,0.0063069053,0.03673778,0.000035343848,0.0021172478,0.00045233747,0.00009899193,0.00010496739,0.0009278275],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99947345,0.000007484946,0.00008258524,0.0001617196,0.00010567703,0.00016907262],"domain_scores_gemma":[0.9997936,0.000027903068,0.000006942404,0.00007808693,0.000062354935,0.000031101652],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011520734,0.00008429287,0.000072422605,0.00011370314,0.00012159253,0.00009701029,0.000030006713,0.00005884958,0.000015540876],"category_scores_gemma":[0.0000044213034,0.000069709575,0.000023577479,0.00024821493,0.000047364847,0.00019018899,0.000009650032,0.00021342622,0.00000510305],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035235873,0.000020739348,0.00021819123,0.0004415909,0.000068346366,0.0000027204576,0.0071980334,0.0004375139,0.0053889644,0.48519117,0.013299228,0.48769826],"study_design_scores_gemma":[0.00028099088,0.000044554876,0.00004536259,0.00014198424,0.000021946544,0.0000754796,0.0016878913,0.20245634,0.0016258684,0.004510225,0.78895134,0.00015800781],"about_ca_topic_score_codex":0.00001383335,"about_ca_topic_score_gemma":0.000060565602,"teacher_disagreement_score":0.7756521,"about_ca_system_score_codex":0.00005088144,"about_ca_system_score_gemma":0.000021347529,"threshold_uncertainty_score":0.2842674},"labels":[],"label_agreement":null},{"id":"W4401536676","doi":"10.22178/pos.106-19","title":"Comparative Analysis of Digital Technology in Architectural, Engineering Construction Industries Across Six Continents of the World: A Global Perspective","year":2024,"lang":"en","type":"article","venue":"Path of Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Economic geography; Regional science; Engineering; Sociology; Geography; Computer science","score_opus":0.0099140800811458,"score_gpt":0.2721274676303608,"score_spread":0.26221338754921497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401536676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972292,0.00016745323,0.0014492658,0.000054287873,0.00022460429,0.0000623088,0.000084635256,0.00003411383,0.00069409615],"genre_scores_gemma":[0.9997357,0.0000017675893,0.00024725174,3.9523053e-7,0.000004638114,0.0000034374825,5.867149e-7,0.0000013335583,0.00000489862],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994214,0.0000038231124,0.00020140129,0.000113345224,0.00015670073,0.00010328826],"domain_scores_gemma":[0.999703,0.000026019336,0.000045031622,0.00009231975,0.00012071727,0.000012902886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007437065,0.000063533334,0.0001718566,0.0004339827,0.00002250732,0.000023322158,0.00015305357,0.000030671054,0.0000035046032],"category_scores_gemma":[0.000056805955,0.00004799177,0.000044827804,0.0068900753,0.0011623938,0.0001811749,0.000035066318,0.00011064426,2.4281618e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023013956,0.000040241815,0.35103405,0.000113187336,0.00049382757,0.0000016373843,0.009853449,0.21678586,0.11360217,0.283252,0.000012284027,0.024788281],"study_design_scores_gemma":[0.00028999746,0.00006166011,0.2771734,0.00044949588,0.00014303515,0.000033492117,0.027220385,0.37589353,0.3153921,0.0030229937,0.00006874402,0.00025117028],"about_ca_topic_score_codex":0.000039871476,"about_ca_topic_score_gemma":0.000096589276,"teacher_disagreement_score":0.280229,"about_ca_system_score_codex":0.00010706981,"about_ca_system_score_gemma":0.000051194802,"threshold_uncertainty_score":0.42828885},"labels":[],"label_agreement":null},{"id":"W4401702875","doi":"10.2139/ssrn.4928724","title":"Quantifying the Impact of Geometry Consideration Using Reference Energy Models for Building Cluster Simulation","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Cluster (spacecraft); Geometry; Computer science; Energy (signal processing); Mathematics; Statistics","score_opus":0.05263392034918904,"score_gpt":0.32490933378586484,"score_spread":0.27227541343667583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401702875","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28276774,0.004360069,0.71198714,0.00002571775,0.0005653166,0.00013299285,0.000015196987,0.000049930815,0.00009588187],"genre_scores_gemma":[0.99760455,0.0009268167,0.0009788849,0.0000056152558,0.0003834377,0.000012756099,0.000017571621,0.000047320427,0.000023062077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984006,0.000054575943,0.0005016243,0.00018016543,0.00017887147,0.0006841175],"domain_scores_gemma":[0.99921495,0.00013668316,0.00021250342,0.00016904477,0.00023744842,0.000029382214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007626998,0.00023172692,0.0002445945,0.00030063026,0.00015366208,0.00018840254,0.00014472599,0.0002626886,0.0000074013283],"category_scores_gemma":[0.000034107183,0.00016919215,0.00028133727,0.00014822287,0.000028168213,0.00017709786,0.000057993006,0.0019363253,4.7254642e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019307448,0.0000031589977,0.0000130030085,0.00005148876,0.0002943814,9.041845e-8,0.0000714644,0.8506139,0.0018669309,0.13393086,0.000012304344,0.013123119],"study_design_scores_gemma":[0.00009063677,0.000026563672,0.000005000275,0.00011504688,0.00007026716,0.00006225964,0.000119523924,0.61345226,0.0003371328,0.38560987,0.000008604068,0.00010285408],"about_ca_topic_score_codex":0.00021250284,"about_ca_topic_score_gemma":0.00026248806,"teacher_disagreement_score":0.7148368,"about_ca_system_score_codex":0.0013737258,"about_ca_system_score_gemma":0.0012708757,"threshold_uncertainty_score":0.84124774},"labels":[],"label_agreement":null},{"id":"W4401710488","doi":"10.1007/978-3-031-60419-5","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 2","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering; Engineering ethics; Library science; Environmental ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005257388716667365,"score_gpt":0.17710796248959093,"score_spread":0.17185057377292356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401710488","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005292145,0.041151144,0.60045797,0.0027140898,0.04929153,0.0104220165,0.0069656176,0.0058922973,0.27781317],"genre_scores_gemma":[0.97453755,0.00015045234,0.003909386,0.0000780803,0.0017522371,0.00036616423,0.00012305455,0.00046956766,0.018613491],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840045,0.0000016164433,0.00046002222,0.00036026278,0.00026280154,0.0005148746],"domain_scores_gemma":[0.99932504,0.000096658936,0.000062418374,0.00019881374,0.00020105374,0.000116018055],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015556948,0.0005245344,0.00046402868,0.00034002718,0.00005806595,0.00012052397,0.00037787337,0.00083658117,0.000088008244],"category_scores_gemma":[0.00012236061,0.0004898277,0.00041358793,0.0004040244,0.00004822269,0.00013496328,0.000046377863,0.0013271996,0.0000070903566],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005186331,0.0000074480968,0.00008823542,0.006414702,0.0005330129,0.0000036207546,0.0031341384,0.91283494,0.0026500062,0.011603719,0.05796735,0.0047576632],"study_design_scores_gemma":[0.00023263614,0.000029546263,0.00009329689,0.0023346986,0.00014325244,0.000033384284,0.000023552324,0.7042793,0.0016621599,0.0024804762,0.2878226,0.00086507876],"about_ca_topic_score_codex":0.00058050506,"about_ca_topic_score_gemma":0.08872286,"teacher_disagreement_score":0.96924543,"about_ca_system_score_codex":0.0009903393,"about_ca_system_score_gemma":0.00042499148,"threshold_uncertainty_score":0.9997553},"labels":[],"label_agreement":null},{"id":"W4401794558","doi":"10.1108/sasbe-11-2023-0364","title":"The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (PRABS)","year":2024,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Brownfield; Decision support system; Systems engineering; Risk assessment; Computer science; Risk analysis (engineering); Engineering; Environmental science; Business; Civil engineering; Data mining; Redevelopment","score_opus":0.007792752009681021,"score_gpt":0.21943595466118312,"score_spread":0.2116432026515021,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401794558","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20189755,0.004467095,0.7921891,0.00013055703,0.00016764992,0.00081665267,0.00000946826,0.000035390723,0.00028654144],"genre_scores_gemma":[0.9955425,0.0016773816,0.0022861026,0.0000020521795,0.000021994545,0.00013468329,0.000004130826,0.000010261266,0.00032087674],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99939233,0.000035014462,0.00021443894,0.00011000747,0.000122064215,0.00012615051],"domain_scores_gemma":[0.99919677,0.0005783364,0.000038380287,0.00014495173,0.000020377882,0.00002119014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006734068,0.0000855226,0.000095914525,0.00003868656,0.00017603824,0.0000555985,0.00005320481,0.000049970808,0.000012621673],"category_scores_gemma":[0.00001786684,0.000051060717,0.00003732284,0.000044158398,0.00006568622,0.00009333465,0.00003502073,0.00007110324,4.084213e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049764075,0.000089120535,0.01643043,0.005173749,0.0008400803,0.000019208906,0.0028881317,0.1920805,0.0070412573,0.15052806,0.009843222,0.6145686],"study_design_scores_gemma":[0.0005381182,0.0007427178,0.014093178,0.00013835418,0.00036017568,0.00003926184,0.014503138,0.9075539,0.01528554,0.005980468,0.040543415,0.00022171758],"about_ca_topic_score_codex":0.000022804019,"about_ca_topic_score_gemma":0.0000013746634,"teacher_disagreement_score":0.79364496,"about_ca_system_score_codex":0.000056401917,"about_ca_system_score_gemma":0.00002126172,"threshold_uncertainty_score":0.20821956},"labels":[],"label_agreement":null},{"id":"W4401847930","doi":"10.1108/ci-08-2023-0210","title":"Where lean construction and offsite construction meet: a bibliographic scientometric analysis","year":2024,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lean construction; Computer science; Engineering; Construction engineering; Construction industry","score_opus":0.010108373769357018,"score_gpt":0.23181314956201535,"score_spread":0.22170477579265832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401847930","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7106038,0.0033260954,0.27237448,0.0002331001,0.0061162165,0.00034911287,0.00006848538,0.0019520893,0.004976666],"genre_scores_gemma":[0.98154163,0.0013658964,0.016378041,0.000028470755,0.0003647119,0.00005933614,0.00013298026,0.000048245554,0.00008065884],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99769884,0.000043716147,0.00086679263,0.0005993931,0.0004568322,0.0003344205],"domain_scores_gemma":[0.9988407,0.00006545474,0.00015236472,0.00029575624,0.00054804643,0.000097671],"candidate_categories":["metaepi_narrow","bibliometrics"],"consensus_categories":["bibliometrics"],"category_scores_codex":[0.00043039868,0.00035459327,0.00035414682,0.027461145,0.00031665977,0.0006496784,0.00010693474,0.00030770962,0.00036688824],"category_scores_gemma":[0.00004534062,0.00037616777,0.0001631529,0.07331111,0.00070994586,0.001331143,0.000026372532,0.00038476332,0.000034829292],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015501926,0.000009375158,0.048622,0.0002633593,0.00080212223,0.0000031381371,0.000120499324,0.00086809974,0.010002147,0.39800352,0.0010812969,0.54020894],"study_design_scores_gemma":[0.004708643,0.0005157401,0.098927766,0.0015471122,0.0068357443,0.008279701,0.0095841875,0.45536906,0.04452178,0.122690395,0.24084458,0.0061753113],"about_ca_topic_score_codex":0.000026708472,"about_ca_topic_score_gemma":0.00004752824,"teacher_disagreement_score":0.53403366,"about_ca_system_score_codex":0.00016526674,"about_ca_system_score_gemma":0.0000745812,"threshold_uncertainty_score":0.99986905},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"agree"},{"id":"W4402003757","doi":"10.1007/978-981-97-1257-1_112","title":"A BIM-Based Numerical Simulation Framework for Tunnels Under Complex Geological Conditions","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomechanica (Canada)","funders":"","keywords":"Geology; Computer science; Civil engineering; Engineering","score_opus":0.024348392902550458,"score_gpt":0.25787099678876674,"score_spread":0.2335226038862163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402003757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00003431266,0.0007340389,0.9922147,0.00020261577,0.0011941418,0.0003964204,0.00013436987,0.00084661006,0.0042428114],"genre_scores_gemma":[0.9804892,0.000014972903,0.01787833,0.00014277267,0.0006259518,0.00012051313,0.00034187717,0.0001623569,0.00022402656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876916,0.000004621402,0.0004055939,0.00035362813,0.00016402098,0.0003029813],"domain_scores_gemma":[0.9986208,0.0009853729,0.000040895746,0.00022444727,0.00005607135,0.0000724148],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00005821157,0.00045764176,0.0004165339,0.00038306203,0.000045371962,0.00006807748,0.00011996894,0.00089223764,0.0007838021],"category_scores_gemma":[0.00010617837,0.00046175308,0.00022282264,0.00013725171,0.000041796604,0.000052555883,0.000016857377,0.0010032605,0.00004393645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004915519,0.0000036152567,0.000003261819,0.00017172436,0.000051089606,0.0000040161844,0.000017327291,0.749469,0.000116177944,0.24910662,0.000027952658,0.001024343],"study_design_scores_gemma":[0.00013096718,0.000027121387,0.000027514607,0.0003841551,0.000049373735,0.0000064900555,8.604815e-7,0.74207497,0.00008363496,0.24655905,0.010286287,0.00036958454],"about_ca_topic_score_codex":0.000002156815,"about_ca_topic_score_gemma":0.000034764227,"teacher_disagreement_score":0.98045486,"about_ca_system_score_codex":0.00025219776,"about_ca_system_score_gemma":0.00002809301,"threshold_uncertainty_score":0.9997834},"labels":[],"label_agreement":null},{"id":"W4402005697","doi":"10.18280/ijsdp.190812","title":"The Role of Design Characteristics of Building Complexes in Achieving Integration","year":2024,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Systems engineering; Architectural engineering; Computer science; Construction engineering; Engineering","score_opus":0.00985494919972035,"score_gpt":0.23236958322921628,"score_spread":0.22251463402949592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402005697","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91259384,0.0029058736,0.08369789,0.000039255818,0.00043267952,0.000044138447,0.0000010218815,0.000009163713,0.00027615155],"genre_scores_gemma":[0.9956078,0.00012858333,0.0041644815,0.0000020025382,0.000060306134,0.0000017788478,0.000002123958,0.000005190327,0.000027739896],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992944,0.000016938888,0.0004193705,0.000036813602,0.0001564943,0.00007598465],"domain_scores_gemma":[0.999459,0.0001561352,0.00009993065,0.00001907341,0.00025150285,0.000014336834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044249528,0.000058368252,0.000097227865,0.00028665876,0.000031400577,0.00007339495,0.0000966762,0.000027603266,0.0000037740638],"category_scores_gemma":[0.00006233256,0.00004376082,0.000020449512,0.00010254609,0.000022385104,0.00022516193,0.00001464582,0.00012874698,1.0118731e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018112412,0.000018692623,0.017339766,0.00018724884,0.00033819422,0.00017825907,0.017822865,0.009456627,0.03406794,0.101002544,0.00011762272,0.8192891],"study_design_scores_gemma":[0.0011717168,0.00019737468,0.13933024,0.007101848,0.00007798472,0.0006096461,0.18195572,0.22092201,0.36449128,0.028073467,0.05539587,0.0006728374],"about_ca_topic_score_codex":0.000004863209,"about_ca_topic_score_gemma":8.8792524e-7,"teacher_disagreement_score":0.8186163,"about_ca_system_score_codex":0.00007861846,"about_ca_system_score_gemma":0.000074775395,"threshold_uncertainty_score":0.17845145},"labels":[],"label_agreement":null},{"id":"W4402030817","doi":"10.1002/9781119902317.ch13","title":"The Language of Digital Technologies","year":2024,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Computer science; Computer graphics (images); Linguistics; Philosophy","score_opus":0.0035078658981805223,"score_gpt":0.1909229669386404,"score_spread":0.18741510104045986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402030817","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000042096917,0.006034107,0.00031575994,0.00003612258,0.0004030721,0.000025821491,0.000020648762,0.0015745764,0.9915857],"genre_scores_gemma":[0.012466151,0.0001784313,0.0000567576,3.8572875e-7,0.000033159504,0.0000048955235,0.0000028294364,0.0000770406,0.98718035],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999871,3.6730188e-7,0.00004142159,0.000029231865,0.000028221993,0.000029739298],"domain_scores_gemma":[0.9999,0.0000037285354,0.0000063380007,0.00008576211,0.0000022367283,0.0000019590632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000040949685,0.000042714495,0.000037416212,0.000041586034,0.0000025456877,0.000023050905,0.00004945696,0.00007921943,0.00017776214],"category_scores_gemma":[0.0000030837543,0.00002334752,0.000020102358,0.000041113253,0.00003239762,0.000007760567,0.000007243554,0.000058993082,0.00020786002],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.790588e-8,2.9604624e-7,0.0000015169215,0.0000319811,0.000026693815,3.1139777e-7,0.000013651464,4.7019356e-7,0.00003773321,0.02368132,0.8656346,0.11057131],"study_design_scores_gemma":[0.000007782425,0.0000018522287,1.1513823e-7,0.00003447353,0.0000043152336,0.0000020388493,0.00104415,0.00006631785,0.0010077183,0.0014748058,0.99631864,0.000037773436],"about_ca_topic_score_codex":0.0000057694497,"about_ca_topic_score_gemma":0.0000486512,"teacher_disagreement_score":0.13068402,"about_ca_system_score_codex":0.0000035682474,"about_ca_system_score_gemma":0.000001737524,"threshold_uncertainty_score":0.26716894},"labels":[],"label_agreement":null},{"id":"W4402035630","doi":"10.32920/26882476.v1","title":"Experiments to Determine the Most Effective Way to Map BIM Information Into Athena Software for Embodied Carbon Calculations","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Embodied cognition; Software; Carbon fibers; Computer science; Operating system; Artificial intelligence","score_opus":0.010356432954566829,"score_gpt":0.2505767075328672,"score_spread":0.24022027457830036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402035630","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2864363,0.00030525302,0.68041855,0.0011813248,0.009760219,0.008564482,0.00026238555,0.0018847944,0.0111866975],"genre_scores_gemma":[0.9782034,0.0000032359117,0.015001087,0.00026049864,0.00030126958,0.00562528,0.00023304056,0.000050728173,0.0003214522],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999066,0.00001690781,0.00035821655,0.00021297146,0.00016489145,0.00018099748],"domain_scores_gemma":[0.9992445,0.00007789562,0.0000363523,0.00034450172,0.00020654373,0.00009019581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009962081,0.00027516537,0.00019963794,0.00026018752,0.00009760432,0.00019585718,0.0001743405,0.00020578317,0.000028989485],"category_scores_gemma":[0.0000784649,0.00020466614,0.00009872206,0.00022224258,0.00001489407,0.00009401668,0.00021956919,0.00026868712,0.00012219991],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008114812,0.000023066454,0.00008882265,0.001374046,0.00051541143,0.0000010149372,0.02636823,0.18530825,0.0024977722,0.019397907,0.00880138,0.75554293],"study_design_scores_gemma":[0.0010028079,0.0003362291,0.0012026576,0.0012833042,0.0004134923,0.000016260306,0.0032134838,0.7457025,0.084453955,0.034564286,0.12556979,0.0022412052],"about_ca_topic_score_codex":0.0003373866,"about_ca_topic_score_gemma":0.0003043375,"teacher_disagreement_score":0.75330174,"about_ca_system_score_codex":0.0003321144,"about_ca_system_score_gemma":0.000030830884,"threshold_uncertainty_score":0.8346043},"labels":[],"label_agreement":null},{"id":"W4402035631","doi":"10.32920/26882476","title":"Experiments to Determine the Most Effective Way to Map BIM Information Into Athena Software for Embodied Carbon Calculations","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Embodied cognition; Software; Carbon fibers; Computer science; Artificial intelligence; Algorithm; Programming language","score_opus":0.010356432954566829,"score_gpt":0.2505767075328672,"score_spread":0.24022027457830036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402035631","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2864363,0.00030525302,0.68041855,0.0011813248,0.009760219,0.008564482,0.00026238555,0.0018847944,0.0111866975],"genre_scores_gemma":[0.9782034,0.0000032359117,0.015001087,0.00026049864,0.00030126958,0.00562528,0.00023304056,0.000050728173,0.0003214522],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999066,0.00001690781,0.00035821655,0.00021297146,0.00016489145,0.00018099748],"domain_scores_gemma":[0.9992445,0.00007789562,0.0000363523,0.00034450172,0.00020654373,0.00009019581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009962081,0.00027516537,0.00019963794,0.00026018752,0.00009760432,0.00019585718,0.0001743405,0.00020578317,0.000028989485],"category_scores_gemma":[0.0000784649,0.00020466614,0.00009872206,0.00022224258,0.00001489407,0.00009401668,0.00021956919,0.00026868712,0.00012219991],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008114812,0.000023066454,0.00008882265,0.001374046,0.00051541143,0.0000010149372,0.02636823,0.18530825,0.0024977722,0.019397907,0.00880138,0.75554293],"study_design_scores_gemma":[0.0010028079,0.0003362291,0.0012026576,0.0012833042,0.0004134923,0.000016260306,0.0032134838,0.7457025,0.084453955,0.034564286,0.12556979,0.0022412052],"about_ca_topic_score_codex":0.0003373866,"about_ca_topic_score_gemma":0.0003043375,"teacher_disagreement_score":0.75330174,"about_ca_system_score_codex":0.0003321144,"about_ca_system_score_gemma":0.000030830884,"threshold_uncertainty_score":0.8346043},"labels":[],"label_agreement":null},{"id":"W4402053681","doi":"10.1007/978-3-031-63276-1_21","title":"Extended Reality in Civil Infrastructure: A Comprehensive Review","year":2024,"lang":"en","type":"review","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Kelowna General Hospital","funders":"","keywords":"Civil infrastructure; Environmental planning; Political science; Engineering ethics; Geography; Civil engineering; Engineering","score_opus":0.019695725200248433,"score_gpt":0.27828659635095554,"score_spread":0.2585908711507071,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402053681","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000014586763,0.98042095,0.015721608,0.000043604174,0.001979321,0.00079711416,0.00005224372,0.0005819038,0.00040182643],"genre_scores_gemma":[0.0009044328,0.9975408,0.00053467124,0.000058370602,0.00033475566,0.0003090317,0.00013575965,0.00017858688,0.0000036367449],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974021,0.000077686476,0.0011429929,0.0005856637,0.0002650195,0.0005265526],"domain_scores_gemma":[0.9989577,0.000262822,0.000093900344,0.0005543751,0.000037262696,0.0000939433],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00019422882,0.0009054365,0.0020035042,0.00077119056,0.000019762268,0.00007136404,0.0003337421,0.00072410976,0.00015327157],"category_scores_gemma":[0.00017403987,0.00079605915,0.00043177692,0.0018264495,0.0000326792,0.000118887765,0.0000742354,0.0023891677,0.00004327614],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[8.535671e-7,0.0000059123486,0.0000012629789,0.1347483,0.00010636785,0.000055270997,0.00006160057,0.032318827,0.0000044897242,0.0002430198,0.00060741295,0.8318467],"study_design_scores_gemma":[0.000111853464,0.00001052034,0.000017658238,0.107146405,0.00033272387,0.00021097166,0.0000012709111,0.012238539,0.0000049771984,0.00078719534,0.8783705,0.000767371],"about_ca_topic_score_codex":0.000025749683,"about_ca_topic_score_gemma":0.0007108117,"teacher_disagreement_score":0.8777631,"about_ca_system_score_codex":0.00067951326,"about_ca_system_score_gemma":0.000115033996,"threshold_uncertainty_score":0.9999124},"labels":[],"label_agreement":null},{"id":"W4402057467","doi":"10.1061/9780784485569.057","title":"Gravity Siphon Design Best Practices","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro; University of Victoria; Winnipeg Regional Health Authority","funders":"","keywords":"Siphon (mollusc); Computer science","score_opus":0.037473850241976955,"score_gpt":0.2721665286916353,"score_spread":0.23469267844965835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402057467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017850915,0.0017078585,0.78347343,0.00035807802,0.0027267814,0.000113503134,0.0000024084422,0.0015642806,0.19220276],"genre_scores_gemma":[0.9913511,0.0000769276,0.0050293226,0.000015552507,0.000113931594,0.000010322956,0.0000015821186,0.00000919804,0.0033920298],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997787,0.0000080043765,0.000055515065,0.00005949003,0.00004570231,0.000052615156],"domain_scores_gemma":[0.99987674,0.00003878158,0.0000062272084,0.000049828388,0.000010855289,0.00001756619],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005367805,0.000043245793,0.00002953072,0.000033658303,0.000017354741,0.000083904306,0.000024610124,0.000033070562,0.00036009517],"category_scores_gemma":[0.000010810058,0.000035178837,0.000016192556,0.00008988124,0.000008014343,0.00020641963,0.0000023125456,0.00007604103,0.00052106567],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006464869,0.000017173372,0.00012263213,0.0001390368,0.00008655894,0.000015108953,0.00030587832,0.004817864,0.046907865,0.11399471,0.05363986,0.77994686],"study_design_scores_gemma":[0.00008604397,0.00005216256,0.00014815616,0.00006084578,0.00004898477,0.00009657939,0.00045436298,0.40826222,0.08140161,0.008493006,0.50061333,0.00028272023],"about_ca_topic_score_codex":0.000040347128,"about_ca_topic_score_gemma":0.000026498461,"teacher_disagreement_score":0.9735002,"about_ca_system_score_codex":0.000016708162,"about_ca_system_score_gemma":0.000009640664,"threshold_uncertainty_score":0.66974187},"labels":[],"label_agreement":null},{"id":"W4402131202","doi":"10.3390/buildings14092738","title":"A Hybrid Decision Support System for Partition Walls","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Partition (number theory); Decision support system; Computer science; Systems engineering; Materials science; Engineering; Artificial intelligence; Mathematics; Combinatorics","score_opus":0.00806408844176938,"score_gpt":0.2227480292048036,"score_spread":0.21468394076303424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402131202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26830575,0.0006102382,0.72105813,0.00007509077,0.0034243574,0.00026383143,0.000046896435,0.0016045927,0.004611084],"genre_scores_gemma":[0.9953211,0.000016195994,0.0041899295,0.000010877552,0.0002034468,0.0000817535,0.000017111051,0.000020227604,0.00013939099],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99956757,0.0000022135416,0.00013876069,0.000111381516,0.000074278614,0.000105803185],"domain_scores_gemma":[0.99983263,0.000033436416,0.000007571087,0.00006733738,0.000027918932,0.00003110304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008256558,0.00006957556,0.000066222754,0.0000730438,0.000034396857,0.00009051315,0.00003986785,0.000036791134,0.00006203813],"category_scores_gemma":[0.00000758752,0.00006434664,0.000058909583,0.00006453952,0.0000073698634,0.00014440426,0.0000043677037,0.00004928891,0.00011688988],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016886781,0.0000048942343,0.000032110845,0.0005068568,0.000044244018,0.000008348966,0.00014072093,0.00083465956,0.037971303,0.21865302,0.08275579,0.65903115],"study_design_scores_gemma":[0.00019419585,0.000043043816,0.000037847,0.00035616496,0.000037241844,0.0001769378,0.00010644611,0.16076884,0.11194283,0.007555805,0.7185856,0.00019506442],"about_ca_topic_score_codex":0.000002702231,"about_ca_topic_score_gemma":0.0000010941524,"teacher_disagreement_score":0.7270153,"about_ca_system_score_codex":0.00008897338,"about_ca_system_score_gemma":0.000011976132,"threshold_uncertainty_score":0.26239797},"labels":[],"label_agreement":null},{"id":"W4402135512","doi":"10.1007/978-3-031-61527-6","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 10","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Environmental ethics; Engineering ethics; Library science; Engineering; Law; Computer science; Philosophy; Thermodynamics; Physics","score_opus":0.005432970205725795,"score_gpt":0.1779182677958861,"score_spread":0.1724852975901603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402135512","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047318763,0.04096664,0.5041499,0.0027649624,0.04557911,0.010883188,0.0074977004,0.0063977432,0.37702888],"genre_scores_gemma":[0.9441787,0.00015493127,0.004506411,0.00008425925,0.0021817705,0.00046299503,0.00017513092,0.0005957584,0.047660053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99836224,0.0000017140065,0.0004695568,0.00037150327,0.00026964166,0.0005253153],"domain_scores_gemma":[0.9992806,0.00010185288,0.000064901506,0.00020629895,0.00022661098,0.00011976282],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016011838,0.00053977664,0.0004742554,0.00034540347,0.000059724094,0.00012616177,0.00038795423,0.00086278946,0.00018977375],"category_scores_gemma":[0.00014137362,0.00050558755,0.0004198097,0.0004114705,0.000049680548,0.0001383145,0.000048215694,0.0012590006,0.000011362855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007050611,0.000008175558,0.000059948412,0.0065239887,0.0005620277,0.0000037281866,0.002878606,0.88012046,0.0025817645,0.008963276,0.093408495,0.004882496],"study_design_scores_gemma":[0.00022014667,0.00003066124,0.00006499661,0.002033783,0.00013244819,0.000028126864,0.000020271607,0.6342129,0.0014733056,0.0017987827,0.35918272,0.0008018316],"about_ca_topic_score_codex":0.0004952956,"about_ca_topic_score_gemma":0.07792307,"teacher_disagreement_score":0.9394468,"about_ca_system_score_codex":0.0009873544,"about_ca_system_score_gemma":0.00043903053,"threshold_uncertainty_score":0.9997396},"labels":[],"label_agreement":null},{"id":"W4402148723","doi":"10.1061/jcemd4.coeng-14837","title":"Critical Review of Virtual Reality Applications in Offsite Construction Research","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Virtual reality; Computer science; Architectural engineering; Human–computer interaction; Construction engineering; Engineering","score_opus":0.02029656381457495,"score_gpt":0.29956095905543323,"score_spread":0.2792643952408583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402148723","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029076604,0.07856666,0.87708694,0.0013387699,0.004821689,0.0007904063,0.000025679888,0.00029318253,0.008000089],"genre_scores_gemma":[0.91088337,0.073371306,0.0153616285,0.000013057711,0.00025923178,0.000043025346,0.0000046658442,0.000025179526,0.00003853914],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989756,0.000032055155,0.00052866724,0.00009779625,0.00024707423,0.00011882999],"domain_scores_gemma":[0.9995465,0.000094047944,0.000036238904,0.000094436626,0.00017435543,0.0000544052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000646829,0.00009074441,0.00019163865,0.0005950153,0.000026132982,0.000036353886,0.00005920761,0.000052169715,0.00002484775],"category_scores_gemma":[0.000038211114,0.000085781954,0.00005735746,0.0005390796,0.000117235584,0.00023584222,0.000015088415,0.0003143844,0.0000014698555],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008357929,0.00001681378,0.00010730423,0.011733425,0.00012197057,0.000014350704,0.0000784679,0.005737198,0.00070114044,0.64689547,0.0010793003,0.33350623],"study_design_scores_gemma":[0.0016232271,0.00047389077,0.0067552654,0.0615512,0.0006577175,0.005047694,0.0051363483,0.12164481,0.004428166,0.016249472,0.7752863,0.0011458606],"about_ca_topic_score_codex":0.0000022212612,"about_ca_topic_score_gemma":8.6786446e-7,"teacher_disagreement_score":0.88180673,"about_ca_system_score_codex":0.00008375741,"about_ca_system_score_gemma":0.00002005417,"threshold_uncertainty_score":0.34980866},"labels":[],"label_agreement":null},{"id":"W4402148851","doi":"10.1007/978-3-031-61527-6_20","title":"Evaluation of Perforated Steel Tubes for Use as an Internal Frame and Partial Rebar Replacement in Precast Concrete Wall Panels","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Rebar; Structural engineering; Materials science; Frame (networking); Steel frame; Composite material; Engineering; Mechanical engineering","score_opus":0.02410924791749763,"score_gpt":0.24607262689649112,"score_spread":0.2219633789789935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402148851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.603407,0.009718999,0.36717716,0.000102514074,0.005112184,0.004260023,0.0003361573,0.0008258836,0.009060069],"genre_scores_gemma":[0.9981711,0.0001151953,0.0010438786,0.00000903248,0.00016710084,0.000103215156,0.00007504012,0.000093657145,0.00022177883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986973,0.000015390238,0.00047599716,0.0003237243,0.0003003277,0.00018726267],"domain_scores_gemma":[0.9994233,0.00014569914,0.00004273249,0.00019702908,0.00014385035,0.000047374207],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004528717,0.00032138606,0.0003402299,0.00035254643,0.000012143504,0.000067327805,0.00007556799,0.0004152851,0.00011768069],"category_scores_gemma":[0.00015808523,0.0003338348,0.0000610407,0.0000653688,0.000025386473,0.00017051998,0.000020451485,0.0005355242,0.0000020060095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011774687,0.000004643269,0.0001470871,0.00086329057,0.00026235735,0.0000060609445,0.001596082,0.9393024,0.008952812,0.007277079,0.000010927895,0.04145951],"study_design_scores_gemma":[0.0005150285,0.00015021901,0.0000526373,0.0012082506,0.0001360473,0.000020488567,0.0000064200094,0.98585516,0.007199056,0.0031580073,0.0013869493,0.00031173124],"about_ca_topic_score_codex":0.0000519713,"about_ca_topic_score_gemma":0.00042797334,"teacher_disagreement_score":0.39476407,"about_ca_system_score_codex":0.0002641912,"about_ca_system_score_gemma":0.00004941224,"threshold_uncertainty_score":0.99991137},"labels":[],"label_agreement":null},{"id":"W4402149055","doi":"10.1007/978-3-031-61539-9","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 13","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering ethics; Engineering; Environmental science; Environmental ethics; Library science; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005278546757023811,"score_gpt":0.1765926982219578,"score_spread":0.171314151464934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402149055","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071256724,0.040143784,0.60627085,0.002741408,0.0493614,0.010589928,0.0068888622,0.0060112313,0.27086687],"genre_scores_gemma":[0.9781617,0.00013715775,0.0030090713,0.000071565155,0.0015630467,0.00033503096,0.00011044731,0.00042353568,0.016188465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983429,0.0000017358527,0.00047539876,0.00037426455,0.00027238502,0.0005333629],"domain_scores_gemma":[0.99929667,0.00010138983,0.000065325374,0.00020656212,0.00020870102,0.00012138573],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016000368,0.0005445154,0.0004799373,0.00034909172,0.00006076855,0.00012725388,0.00039063356,0.0008605832,0.000091369235],"category_scores_gemma":[0.00012752834,0.0005095777,0.00042258154,0.00041552767,0.00005006926,0.00014205511,0.00004859239,0.0013699501,0.000007590548],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004837611,0.000006887806,0.00009877907,0.0057213046,0.00048640286,0.0000033556066,0.002965241,0.92595893,0.0022959725,0.008143383,0.05015474,0.004160152],"study_design_scores_gemma":[0.00024683858,0.000030905823,0.00012049291,0.0024016504,0.00014832897,0.000034707915,0.000026398498,0.7550409,0.0015709132,0.0024038337,0.23707438,0.00090066437],"about_ca_topic_score_codex":0.000781982,"about_ca_topic_score_gemma":0.12057822,"teacher_disagreement_score":0.971036,"about_ca_system_score_codex":0.0009855237,"about_ca_system_score_gemma":0.0004306717,"threshold_uncertainty_score":0.9997356},"labels":[],"label_agreement":null},{"id":"W4402189015","doi":"10.32920/26883484.v1","title":"Improving Circularity in Ontario Building Design Through Design for Disassembly Principles","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Design elements and principles; Computer science; Engineering; Systems engineering","score_opus":0.06975336541624752,"score_gpt":0.26031609712765774,"score_spread":0.19056273171141022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402189015","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02254744,0.00042809214,0.9705388,0.000040021077,0.0022331383,0.0011725608,0.000007711165,0.0006109816,0.0024212645],"genre_scores_gemma":[0.5986893,0.000017381122,0.40022993,0.00001559126,0.00011814322,0.0005768437,0.000017199645,0.00006274037,0.0002728411],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985378,0.000041441068,0.00047695872,0.0004878033,0.00014462855,0.00031139312],"domain_scores_gemma":[0.99940866,0.00012921786,0.00005407513,0.00030976243,0.000055537614,0.000042728843],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041182942,0.00034712418,0.00033090884,0.00015315812,0.00005296717,0.00026403178,0.00021619331,0.00046495884,0.000063296306],"category_scores_gemma":[0.000041825948,0.00034204498,0.0001673068,0.00010254584,0.000030258698,0.00013307897,0.00017563814,0.0009438931,0.000009575765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031466185,0.00002856195,0.00027858277,0.0012709473,0.0002080933,0.000010449272,0.0016889961,0.743034,0.018342916,0.21671912,0.00044150284,0.017945355],"study_design_scores_gemma":[0.00026959155,0.000029660667,0.00024858222,0.00046759695,0.00010558283,0.000015565975,0.00014422763,0.77575123,0.04312566,0.17792471,0.0012203516,0.00069723564],"about_ca_topic_score_codex":0.013932938,"about_ca_topic_score_gemma":0.0331041,"teacher_disagreement_score":0.5761419,"about_ca_system_score_codex":0.001061599,"about_ca_system_score_gemma":0.00040395578,"threshold_uncertainty_score":0.99990314},"labels":[],"label_agreement":null},{"id":"W4402192846","doi":"10.32920/26883484","title":"Improving Circularity in Ontario Building Design Through Design for Disassembly Principles","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Design elements and principles; Computer science; Engineering; Systems engineering; Construction engineering","score_opus":0.06975336541624752,"score_gpt":0.26031609712765774,"score_spread":0.19056273171141022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402192846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02254744,0.00042809214,0.9705388,0.000040021077,0.0022331383,0.0011725608,0.000007711165,0.0006109816,0.0024212645],"genre_scores_gemma":[0.5986893,0.000017381122,0.40022993,0.00001559126,0.00011814322,0.0005768437,0.000017199645,0.00006274037,0.0002728411],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985378,0.000041441068,0.00047695872,0.0004878033,0.00014462855,0.00031139312],"domain_scores_gemma":[0.99940866,0.00012921786,0.00005407513,0.00030976243,0.000055537614,0.000042728843],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00041182942,0.00034712418,0.00033090884,0.00015315812,0.00005296717,0.00026403178,0.00021619331,0.00046495884,0.000063296306],"category_scores_gemma":[0.000041825948,0.00034204498,0.0001673068,0.00010254584,0.000030258698,0.00013307897,0.00017563814,0.0009438931,0.000009575765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031466185,0.00002856195,0.00027858277,0.0012709473,0.0002080933,0.000010449272,0.0016889961,0.743034,0.018342916,0.21671912,0.00044150284,0.017945355],"study_design_scores_gemma":[0.00026959155,0.000029660667,0.00024858222,0.00046759695,0.00010558283,0.000015565975,0.00014422763,0.77575123,0.04312566,0.17792471,0.0012203516,0.00069723564],"about_ca_topic_score_codex":0.013932938,"about_ca_topic_score_gemma":0.0331041,"teacher_disagreement_score":0.5761419,"about_ca_system_score_codex":0.001061599,"about_ca_system_score_gemma":0.00040395578,"threshold_uncertainty_score":0.99990314},"labels":[],"label_agreement":null},{"id":"W4402289902","doi":"10.1016/j.autcon.2024.105731","title":"Automated safety and practicality enhancement of lift plans in modular construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Lift (data mining); Modular design; Engineering; Construction engineering; Modular construction; Computer science; Architectural engineering; Engineering drawing; Civil engineering; Systems engineering; Transport engineering; Data mining; Programming language","score_opus":0.0068668339688412955,"score_gpt":0.23929298330853352,"score_spread":0.23242614933969222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402289902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9297047,0.0003266533,0.06376659,0.00020237357,0.0017943233,0.00032618892,0.000029623645,0.0010341527,0.0028153423],"genre_scores_gemma":[0.9925107,0.0002884229,0.007074282,0.000005876597,0.00003530625,0.00002963115,0.00003500402,0.00001329481,0.000007529966],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99873465,0.00007276316,0.0006633508,0.00021865891,0.00016742075,0.00014315028],"domain_scores_gemma":[0.9996405,0.00008730629,0.000066954526,0.00012231208,0.000049313603,0.000033605207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029176014,0.0001411092,0.00019828019,0.00045621526,0.000031562093,0.000050980154,0.000037244707,0.00016286847,0.00009456594],"category_scores_gemma":[0.000043784665,0.00015316467,0.000029928902,0.0005611248,0.00014658688,0.0005792421,0.000010242158,0.00021355828,0.000010309826],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000106797044,0.00006478377,0.026538868,0.0012067449,0.00012748786,0.000012938671,0.0019349428,0.020242834,0.04184665,0.25321293,0.00016269954,0.6545423],"study_design_scores_gemma":[0.00046244415,0.000028506987,0.028761046,0.0003281187,0.000018781464,0.00019198086,0.00068717526,0.95315117,0.011327657,0.0038298233,0.001021774,0.00019151844],"about_ca_topic_score_codex":0.00006582507,"about_ca_topic_score_gemma":0.00009048817,"teacher_disagreement_score":0.93290836,"about_ca_system_score_codex":0.00019421137,"about_ca_system_score_gemma":0.000050105456,"threshold_uncertainty_score":0.6245874},"labels":[],"label_agreement":null},{"id":"W4402444632","doi":"10.1139/cjce-2024-0180","title":"Multi-objective optimization and simulation of earthwork equipment configuration in the upper reservoir of a pumped storage power station","year":2024,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Department of Education of Guizhou Province; Guizhou Science and Technology Department","keywords":"Earthworks; Environmental science; Power station; Power (physics); Engineering; Hydro power; Petroleum engineering; Civil engineering; Environmental engineering; Electrical engineering; Geotechnical engineering","score_opus":0.008407861788444949,"score_gpt":0.2096204659611881,"score_spread":0.20121260417274317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402444632","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.396292,0.0017801491,0.6009593,0.000054308697,0.00050867675,0.00014213617,0.000013705197,0.000012967052,0.0002367317],"genre_scores_gemma":[0.9990117,0.000027288146,0.00090439955,0.0000033995716,0.000029772973,0.0000026867258,0.000004552312,0.000011268531,0.0000049187142],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994194,0.000022546197,0.00031419809,0.000049734983,0.00010811706,0.00008602439],"domain_scores_gemma":[0.9996538,0.00007558513,0.000053104155,0.000052377425,0.00011470889,0.00005038614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002446732,0.000072211296,0.000106923,0.00040877736,0.000016476031,0.000036860303,0.00004530446,0.00005238236,0.000047171077],"category_scores_gemma":[0.00006204628,0.000063071835,0.000031477735,0.0002628114,0.00001759765,0.00027874447,0.0000014385465,0.00014632383,2.2741872e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003487343,0.0000019560848,0.00019053649,0.000060652914,0.000021310023,0.0000039664915,0.0029881895,0.99376166,0.002068195,0.00034343993,0.000018943085,0.00053766504],"study_design_scores_gemma":[0.0001732586,0.000038886483,0.005231257,0.0002675044,0.000013123478,0.0000135814735,0.0006600789,0.99254376,0.00074555475,0.000034412293,0.00022004567,0.000058567362],"about_ca_topic_score_codex":0.00013174854,"about_ca_topic_score_gemma":0.0058402987,"teacher_disagreement_score":0.6027197,"about_ca_system_score_codex":0.000096539494,"about_ca_system_score_gemma":0.00010611886,"threshold_uncertainty_score":0.32590237},"labels":[],"label_agreement":null},{"id":"W4402477089","doi":"10.11159/icceia24.113","title":"Digital Twin Applications In Construction: Creation And Interaction Of Virtual And Data LayersDigital Twin Applications In Construction: Creation And Interaction Of Virtual And Data Layers","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Human–computer interaction","score_opus":0.01719106908412851,"score_gpt":0.27192052524229215,"score_spread":0.25472945615816367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402477089","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9933405,0.0008354012,0.0011854004,0.0007451901,0.00033860264,0.000783714,0.00030305807,0.00032230673,0.0021458082],"genre_scores_gemma":[0.99825287,0.0005891708,0.0008946657,0.0000025690294,0.00003077765,0.000056277906,0.0000781236,0.000015770642,0.000079782076],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987711,0.000006264936,0.00050570903,0.00044993582,0.00015334543,0.000113680646],"domain_scores_gemma":[0.9991807,0.00018734636,0.00021194403,0.0003135082,0.00007815557,0.000028387098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000121840785,0.00019746002,0.00026616323,0.00069106993,0.000061009923,0.00018830616,0.00029804965,0.0001405135,0.0000032808994],"category_scores_gemma":[0.00013119585,0.0001742606,0.000019516947,0.00072883256,0.0007029088,0.0018508887,0.0003154351,0.00031703862,2.854505e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011920989,0.00005638458,0.07403178,0.00038717917,0.00012322051,2.596068e-7,0.0004205389,0.0001273098,0.009323251,0.10864929,0.00043795325,0.80632365],"study_design_scores_gemma":[0.0066070207,0.0011793287,0.052863352,0.009519066,0.00091571984,0.0010997936,0.2554223,0.20394409,0.33762854,0.06047645,0.06743108,0.0029132788],"about_ca_topic_score_codex":0.000045464327,"about_ca_topic_score_gemma":0.00014747656,"teacher_disagreement_score":0.80341035,"about_ca_system_score_codex":0.000058024198,"about_ca_system_score_gemma":0.0000292322,"threshold_uncertainty_score":0.7106141},"labels":[],"label_agreement":null},{"id":"W4402477124","doi":"10.11159/icceia24.131","title":"Assessment and Retrofitting Of a Multi-Storey Reinforced Concrete Building","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Retrofitting; Reinforced concrete; Architectural engineering; Construction engineering; Civil engineering; Computer science; Structural engineering; Engineering","score_opus":0.013034587527881003,"score_gpt":0.2567087066839989,"score_spread":0.24367411915611792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402477124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9872297,0.0014359835,0.00027980047,0.0012294605,0.001282529,0.00032404205,0.0000073047217,0.00213177,0.0060794004],"genre_scores_gemma":[0.99140126,0.00011604448,0.007457505,0.0000060651205,0.000018427523,0.000016618513,2.0887218e-7,0.000016427828,0.00096746907],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993201,0.0000014154552,0.00025884513,0.00014991726,0.00014262035,0.00012708663],"domain_scores_gemma":[0.99968326,0.00005219164,0.00009165636,0.000099038094,0.000058668473,0.000015183447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009807265,0.00013292648,0.00018118556,0.00027644678,0.00004429834,0.00006153182,0.00024533446,0.000090146,0.0000036831866],"category_scores_gemma":[0.00008807863,0.00009602577,0.00005735902,0.00043995425,0.00017521338,0.00016440965,0.00009199477,0.00030034658,4.1396245e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010974635,8.9954165e-7,0.0034175578,0.00045481217,0.000106679094,4.2725466e-7,0.00009478584,0.000103689825,0.526228,0.38889766,0.002781319,0.07790321],"study_design_scores_gemma":[0.00022701136,0.00004231602,0.0004378168,0.0013108997,0.00003409856,0.000008448338,0.00075352663,0.055004388,0.93727326,0.0017316324,0.0030271607,0.00014945213],"about_ca_topic_score_codex":0.000007881215,"about_ca_topic_score_gemma":0.0000026874318,"teacher_disagreement_score":0.41104525,"about_ca_system_score_codex":0.000054511278,"about_ca_system_score_gemma":0.000018039307,"threshold_uncertainty_score":0.3915817},"labels":[],"label_agreement":null},{"id":"W4402481486","doi":"10.1201/9781003483755-278","title":"A framework for an integrated &amp; digitally-supported bridge management","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Bridge (graph theory); Computer science; Engineering; Medicine; Internal medicine","score_opus":0.02841244653182656,"score_gpt":0.25189188598605405,"score_spread":0.2234794394542275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402481486","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000007838517,0.00013670803,0.35926703,0.000026229654,0.0011111064,0.00035045287,0.00015499853,0.0009941641,0.63795143],"genre_scores_gemma":[0.0037531136,0.00014785865,0.02035618,0.00009139058,0.00031371467,0.00012074823,0.0013928498,0.00017902761,0.9736451],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904525,0.0000014085158,0.00032346608,0.00031297214,0.00013980371,0.0001770905],"domain_scores_gemma":[0.999461,0.000019628931,0.000031311374,0.00033009605,0.00007465578,0.000083297506],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000041093936,0.00034466517,0.00023281098,0.0002149548,0.000030118112,0.00019597223,0.0001341492,0.0004180797,0.0014425273],"category_scores_gemma":[0.0000029750609,0.0003103023,0.00016841872,0.00004483168,0.00003214987,0.00012362635,0.000020359086,0.00036771613,0.0006620606],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068560885,0.0000036618176,3.5005593e-7,0.00017862568,0.0002785084,0.000003618098,0.000026913567,0.00006415614,0.0000039732377,0.89706707,0.028984668,0.07338161],"study_design_scores_gemma":[0.00005914917,0.00002464568,0.0000031001096,0.00023363017,0.00009874157,0.000014507693,0.000018036839,0.0012618988,0.000014782864,0.2697949,0.72818214,0.00029446167],"about_ca_topic_score_codex":0.0000047433987,"about_ca_topic_score_gemma":0.00010044468,"teacher_disagreement_score":0.6991975,"about_ca_system_score_codex":0.00010020059,"about_ca_system_score_gemma":0.000015327152,"threshold_uncertainty_score":0.9999349},"labels":[],"label_agreement":null},{"id":"W4402534755","doi":"10.1007/978-3-031-61511-5","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 7","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering; Library science; Environmental ethics; Engineering ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.0053620730816654515,"score_gpt":0.17743084315095725,"score_spread":0.1720687700692918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402534755","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005298154,0.040460132,0.60989946,0.002695108,0.048559383,0.010331097,0.006829306,0.005831632,0.2700957],"genre_scores_gemma":[0.9752225,0.00014613755,0.0038652278,0.00007653531,0.0016973574,0.00035848084,0.0001187928,0.00046045386,0.018054496],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839973,0.0000016162345,0.00046015752,0.00036046008,0.00026290512,0.0005151206],"domain_scores_gemma":[0.99932444,0.00009708988,0.00006235781,0.00019895005,0.00020113298,0.00011604946],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001564038,0.0005247204,0.0004641396,0.0003402625,0.000058086272,0.00012057676,0.00037800008,0.00083659345,0.000085236636],"category_scores_gemma":[0.00012144226,0.0004899851,0.0004136888,0.00040423236,0.00004823995,0.00013500474,0.000046374964,0.001327423,0.0000070672327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005238934,0.000007488661,0.00009107444,0.0064974814,0.00053539564,0.0000036042895,0.0031527851,0.91454554,0.002737061,0.011764415,0.055904176,0.0047557247],"study_design_scores_gemma":[0.00023486959,0.000029858462,0.0000948575,0.0023988537,0.00014463007,0.000033596214,0.000023897339,0.71430576,0.0017017382,0.0025091236,0.27764922,0.0008735846],"about_ca_topic_score_codex":0.00058154407,"about_ca_topic_score_gemma":0.089351445,"teacher_disagreement_score":0.9699244,"about_ca_system_score_codex":0.0009905123,"about_ca_system_score_gemma":0.00042595735,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W4402602403","doi":"10.1007/978-3-031-61499-6_26","title":"Integrating Building Information Modeling (BIM), GIS, and Circular Economy (CE) for the Construction and Deconstruction Waste Based on Construction Methods at the Conceptual Design Stage of Buildings","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Deconstruction (building); Building information modeling; Circular economy; Architectural engineering; Construction engineering; Conceptual design; Civil engineering; Engineering; Waste management; Mechanical engineering; Operations management","score_opus":0.013739701824206401,"score_gpt":0.2259225648366686,"score_spread":0.2121828630124622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015344467,0.003146651,0.9915831,0.0000721849,0.0012439815,0.00081356993,0.00005682677,0.00016995166,0.0013792613],"genre_scores_gemma":[0.6520283,0.0007512873,0.34597608,0.000088634115,0.0005108163,0.00025839062,0.00007738275,0.00021906693,0.00009002017],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99849224,0.00002826895,0.0007349141,0.00033590832,0.00015899082,0.0002496531],"domain_scores_gemma":[0.9981775,0.0011960305,0.00020574639,0.00025646907,0.00011383696,0.000050377123],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00060433283,0.0004960902,0.0004355665,0.00048852194,0.00018211394,0.00016272435,0.00011852806,0.00047219908,0.00003916029],"category_scores_gemma":[0.00017720224,0.00038765892,0.00013554461,0.00013184312,0.0002829838,0.00033205742,0.000042783067,0.0008363367,6.333179e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002312418,6.415096e-7,0.0000074588625,0.00046867874,0.00009423107,2.8075738e-7,0.00025937095,0.8200013,0.0012077768,0.08253643,0.0000030437097,0.09539767],"study_design_scores_gemma":[0.00034840332,0.000044452583,6.2233676e-7,0.00065332843,0.00013436501,0.00009845511,0.0002404544,0.97129524,0.008667057,0.014394041,0.0037657835,0.0003577831],"about_ca_topic_score_codex":0.00002007224,"about_ca_topic_score_gemma":0.00004030313,"teacher_disagreement_score":0.65049386,"about_ca_system_score_codex":0.0003236107,"about_ca_system_score_gemma":0.000051840263,"threshold_uncertainty_score":0.99985754},"labels":[],"label_agreement":null},{"id":"W4402602549","doi":"10.1007/978-3-031-61499-6_29","title":"Design for Manufacturing and Assembly (DfMA) in Off-Site Construction (OSC) and On-Site Construction","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canam Group (Canada); École de Technologie Supérieure","funders":"","keywords":"Engineering; Manufacturing engineering; Construction engineering","score_opus":0.0089936592377682,"score_gpt":0.1941702166550414,"score_spread":0.18517655741727318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602549","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036043435,0.009634848,0.9333789,0.0002147983,0.004945564,0.0018279171,0.00014845417,0.001159454,0.01264664],"genre_scores_gemma":[0.97142655,0.0024021966,0.023955265,0.000062377476,0.000819552,0.00017991195,0.00010619458,0.00038608987,0.00066186045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985618,0.000008266812,0.00044741156,0.0005107014,0.0001566663,0.0003151808],"domain_scores_gemma":[0.99932885,0.00032404566,0.00006104046,0.00018536749,0.000028165148,0.00007254803],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015320687,0.00054894533,0.00046726197,0.00085236237,0.00004515848,0.00012801198,0.000060377562,0.00066061463,0.000027542827],"category_scores_gemma":[0.0000332486,0.00059905805,0.000075098644,0.00008472129,0.00006921858,0.00015756187,0.000025158475,0.000930959,0.0000072783278],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008526825,0.0000061265096,0.00015041413,0.0018512192,0.00019869785,0.00004062532,0.0005893721,0.6997139,0.006114757,0.03662743,0.000042983593,0.2545792],"study_design_scores_gemma":[0.0021539074,0.00025430878,0.00047705197,0.0057990663,0.00027485532,0.0010894068,0.000031039257,0.8595559,0.041768827,0.057492636,0.028366791,0.0027361866],"about_ca_topic_score_codex":0.000010144395,"about_ca_topic_score_gemma":0.00035056556,"teacher_disagreement_score":0.93538314,"about_ca_system_score_codex":0.0002522517,"about_ca_system_score_gemma":0.000021354885,"threshold_uncertainty_score":0.99964607},"labels":[],"label_agreement":null},{"id":"W4402602915","doi":"10.1007/978-3-031-61499-6","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 4","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering ethics; Environmental ethics; Library science; Engineering; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.0053885573219292675,"score_gpt":0.17753364734223762,"score_spread":0.17214509002030834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602915","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0052710036,0.040422708,0.6099959,0.002678495,0.048486903,0.010320703,0.006866712,0.0058235973,0.27013397],"genre_scores_gemma":[0.9755127,0.000144884,0.0038389573,0.00007595538,0.0016850668,0.000356256,0.00011756798,0.00045710488,0.017811552],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983999,0.0000016153964,0.00046016346,0.0003603881,0.00026288876,0.00051505136],"domain_scores_gemma":[0.9993257,0.00009725096,0.000062362065,0.0001989727,0.00019971945,0.00011602943],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015633895,0.00052464375,0.00046406678,0.00034025413,0.000058082813,0.00012056891,0.00037808626,0.00083657686,0.000086297834],"category_scores_gemma":[0.00012211614,0.00048993627,0.00041366048,0.00040411815,0.000048233596,0.00013499058,0.000046369878,0.0013271914,0.0000070954225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000053531276,0.0000075482744,0.00009215022,0.0064995466,0.0005396412,0.000003633138,0.0031759534,0.91332555,0.0027356253,0.011880015,0.05696993,0.004765059],"study_design_scores_gemma":[0.00023495265,0.000030157067,0.000095180636,0.002377244,0.0001445631,0.000033594788,0.000023897586,0.7143317,0.0016842086,0.002509807,0.27766147,0.00087324105],"about_ca_topic_score_codex":0.0005767569,"about_ca_topic_score_gemma":0.0890706,"teacher_disagreement_score":0.97024167,"about_ca_system_score_codex":0.0009901806,"about_ca_system_score_gemma":0.000425431,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W4402603044","doi":"10.1007/978-3-031-61499-6_11","title":"Predicting Change Order Magnitude in Construction Projects—A Machine Learning Approach","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Order (exchange); Magnitude (astronomy); Computer science; Physics; Economics","score_opus":0.012265776825731245,"score_gpt":0.1931519364204829,"score_spread":0.18088615959475166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402603044","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038083117,0.04726866,0.42007652,0.0001773371,0.01019012,0.0032368249,0.00013735867,0.0063487724,0.5087561],"genre_scores_gemma":[0.9793942,0.0014210955,0.012874449,0.00004012691,0.0020801255,0.0004417463,0.00036390006,0.0006428202,0.0027415375],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983399,0.000009889235,0.00051335583,0.0004847823,0.0002519217,0.00040014565],"domain_scores_gemma":[0.99953437,0.00008709363,0.00005994988,0.00020978572,0.00005251868,0.000056300956],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00016006762,0.00059480715,0.00047630465,0.0010426734,0.00003466187,0.0000949597,0.00013945102,0.00073697604,0.00012882546],"category_scores_gemma":[0.0000893429,0.0006346749,0.000102681915,0.0003561083,0.00003605491,0.00018883767,0.000050235907,0.002656167,0.000020947398],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000925219,0.000007940577,0.0015139806,0.0016806294,0.000108256194,0.000044538803,0.0011873057,0.9352934,0.0003106241,0.009589713,0.0000055190735,0.05024886],"study_design_scores_gemma":[0.00030592256,0.00003085562,0.00007851551,0.001475319,0.00005453446,0.00018729719,0.000016287637,0.98639095,0.00017495491,0.0020425266,0.008492877,0.0007499372],"about_ca_topic_score_codex":0.00007764345,"about_ca_topic_score_gemma":0.0014692172,"teacher_disagreement_score":0.9755859,"about_ca_system_score_codex":0.00037866295,"about_ca_system_score_gemma":0.000029317376,"threshold_uncertainty_score":0.99964476},"labels":[],"label_agreement":null},{"id":"W4402603215","doi":"10.1007/978-3-031-61499-6_21","title":"Toward a Decision Support System for a Toolbox Meeting Pertaining to Roofing Activities in Construction","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Toolbox; Computer science; Engineering; Architectural engineering; Systems engineering; Programming language","score_opus":0.010438058850786523,"score_gpt":0.20820445258236103,"score_spread":0.1977663937315745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402603215","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023305898,0.0016322901,0.9469869,0.000048708887,0.004908024,0.0008542439,0.000059181497,0.0010522598,0.04212777],"genre_scores_gemma":[0.97663754,0.00003234926,0.021755198,0.00001716559,0.00068281306,0.0002487165,0.000038157672,0.00026280232,0.0003252487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99819285,0.0000040952373,0.0006539526,0.00048017915,0.00024218975,0.00042675284],"domain_scores_gemma":[0.99916035,0.00044187,0.00005676664,0.00021999022,0.000043284166,0.00007773555],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024019502,0.0005432993,0.0005892738,0.0011898306,0.000039463594,0.0001417308,0.00014791486,0.0005916241,0.000038057715],"category_scores_gemma":[0.00013803446,0.00059796835,0.00017820511,0.00020566389,0.000017259623,0.00015096451,0.000036648453,0.00083014823,0.000012929106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029709994,0.0000016626639,0.00002867002,0.0015917589,0.00006626181,0.000034675726,0.0009839355,0.8693189,0.0014838825,0.016850889,0.000021169739,0.1095885],"study_design_scores_gemma":[0.0007152642,0.00011749398,0.000020168758,0.016032156,0.00011905955,0.00039542245,0.00025079062,0.9473216,0.00489352,0.008226071,0.020182077,0.0017263553],"about_ca_topic_score_codex":0.000022054826,"about_ca_topic_score_gemma":0.0015275632,"teacher_disagreement_score":0.97430694,"about_ca_system_score_codex":0.0009383003,"about_ca_system_score_gemma":0.00005355438,"threshold_uncertainty_score":0.9996472},"labels":[],"label_agreement":null},{"id":"W4402603629","doi":"10.1007/978-3-031-61499-6_7","title":"Barriers to the Implementation of Integrated Design Processes—The Case of the Construction Industry in Quebec, Canada","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Business; Construction industry; Engineering; Construction engineering","score_opus":0.005989672180618978,"score_gpt":0.20059323040303867,"score_spread":0.1946035582224197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402603629","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17657888,0.01693395,0.7408138,0.009791582,0.025960779,0.011134064,0.0016931575,0.0008881349,0.016205657],"genre_scores_gemma":[0.9993478,0.000023996061,0.00017401099,0.00004094513,0.000082335675,0.000055118046,0.000008123557,0.000049725248,0.00021793297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906296,0.00001630167,0.00044455202,0.00016123083,0.00015642866,0.00015850677],"domain_scores_gemma":[0.99938494,0.0001830733,0.000076537755,0.00023422853,0.00008265258,0.000038589624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013800169,0.0002560353,0.00021968673,0.00019219716,0.000032970776,0.000025136087,0.00018641862,0.00039291175,0.00014309908],"category_scores_gemma":[0.00013891007,0.00016016363,0.000047331658,0.00044550232,0.000046343965,0.0000468209,0.000026003892,0.001406551,4.1894918e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004768676,6.103235e-7,0.00011867831,0.00033710562,0.00006666532,0.000020226586,0.0009947405,0.97916895,0.00030352818,0.0030658818,0.00021111312,0.01570775],"study_design_scores_gemma":[0.0026076562,0.00022782561,0.0012561483,0.016939176,0.0012549058,0.003697268,0.013679549,0.5451586,0.2519389,0.020519864,0.1374943,0.0052257753],"about_ca_topic_score_codex":0.17835258,"about_ca_topic_score_gemma":0.9795994,"teacher_disagreement_score":0.8227689,"about_ca_system_score_codex":0.0004984291,"about_ca_system_score_gemma":0.00072759594,"threshold_uncertainty_score":0.8271188},"labels":[],"label_agreement":null},{"id":"W4402673781","doi":"10.1109/tem.2024.3461508","title":"Exploring the Challenges in Building Information Modeling (BIM) During the Design Phase: Evidence From Cross-Country Studies","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Building information modeling; Phase (matter); Systems engineering; Engineering; Computer science; Business; Operations management","score_opus":0.10988166376211268,"score_gpt":0.2813967210592218,"score_spread":0.17151505729710914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402673781","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15241544,0.0051135276,0.8390614,0.00013254951,0.0023919982,0.0002920583,0.00000574073,0.00054728705,0.000039989303],"genre_scores_gemma":[0.984641,0.013318474,0.001285839,0.000007761193,0.00009321026,0.0006147057,6.3396124e-7,0.000027718756,0.000010648263],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990156,0.000020370764,0.0003305372,0.00017700923,0.00023275941,0.0002236747],"domain_scores_gemma":[0.99948955,0.00019341765,0.000014232199,0.000253293,0.000026408501,0.000023113234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031843316,0.00020856624,0.00012085114,0.00029848862,0.00016996994,0.00024185193,0.00018447486,0.00003726028,0.000007430182],"category_scores_gemma":[0.0000061523506,0.0001518081,0.0000608541,0.0003924284,0.000021544567,0.0014876894,0.0000034334626,0.00037918842,0.000018702432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011512466,0.0000057725074,3.5832974e-7,0.00030426684,0.00016982078,0.000003998353,0.001552666,0.94180655,0.000627579,0.0009346956,0.0000033712724,0.05457938],"study_design_scores_gemma":[0.000190373,0.000012474496,0.00007411247,0.0009611539,0.000046992427,0.0000049016667,0.0013268425,0.9905845,0.006139218,0.00010153559,0.0003856215,0.00017229698],"about_ca_topic_score_codex":0.00001661349,"about_ca_topic_score_gemma":0.0000129171785,"teacher_disagreement_score":0.8377756,"about_ca_system_score_codex":0.00028307506,"about_ca_system_score_gemma":0.0000056806484,"threshold_uncertainty_score":0.61905545},"labels":[],"label_agreement":null},{"id":"W4402685554","doi":"10.1061/jcemd4.coeng-15141","title":"Defining Information Requirements for Off-Site Construction Management: An Industry Case Study from Canada","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of New Brunswick","funders":"","keywords":"Construction industry; Business; Construction engineering; Process management; Computer science; Operations management; Engineering","score_opus":0.006128696407340709,"score_gpt":0.2059419381125638,"score_spread":0.1998132417052231,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402685554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89487445,0.0008151607,0.09767859,0.00003311705,0.0054221256,0.00039727511,0.00004434386,0.00017661974,0.00055829354],"genre_scores_gemma":[0.9813199,0.00026555432,0.018143395,0.000016376533,0.00016947961,0.00003073073,0.000018586972,0.000020148487,0.000015851869],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989288,0.000013395198,0.0005560484,0.00012154282,0.00022856692,0.00015164827],"domain_scores_gemma":[0.9995851,0.000024198294,0.000095524934,0.000111334775,0.00008641004,0.0000974636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018991421,0.00017536338,0.00017273199,0.00041803395,0.000087750464,0.00021066448,0.0000597097,0.000084052626,0.000017464277],"category_scores_gemma":[0.0000049457763,0.00017938712,0.000043911186,0.0002083652,0.000019771674,0.0010685188,0.00001740471,0.00026269068,0.0000010449512],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031672844,0.000018720488,0.0010222788,0.00059082615,0.0010730101,0.0005349851,0.00060211,0.068160005,0.000043982513,0.017065516,0.0008357004,0.9100212],"study_design_scores_gemma":[0.0063710194,0.00063689804,0.0073230467,0.0016520754,0.002342375,0.023490237,0.08199369,0.649827,0.000552652,0.0012012472,0.22297502,0.0016347456],"about_ca_topic_score_codex":0.0015891979,"about_ca_topic_score_gemma":0.0013396274,"teacher_disagreement_score":0.90838647,"about_ca_system_score_codex":0.0001924843,"about_ca_system_score_gemma":0.000032570348,"threshold_uncertainty_score":0.7315194},"labels":[],"label_agreement":null},{"id":"W4402826711","doi":"10.1007/978-3-031-61531-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 11","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Library science; Engineering ethics; Engineering; Environmental ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005424163390262451,"score_gpt":0.1772019640249913,"score_spread":0.17177780063472886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402826711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00892618,0.036944117,0.66969365,0.0031283412,0.053112518,0.011342248,0.0075490037,0.0065020286,0.2028019],"genre_scores_gemma":[0.9778262,0.000116305884,0.003602284,0.000071364055,0.001590479,0.00033796718,0.0001146681,0.00043722725,0.015903514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99834484,0.0000017377486,0.0004744647,0.0003737732,0.000271125,0.00053407974],"domain_scores_gemma":[0.9993002,0.00009987979,0.00006532076,0.0002065412,0.00020689268,0.0001212096],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016106233,0.00054378423,0.00047989612,0.00035019868,0.00006063183,0.00012412014,0.00039062614,0.0008523918,0.00008713478],"category_scores_gemma":[0.00012599188,0.00050936104,0.00042307368,0.0004167209,0.000049957325,0.00014087798,0.00004850967,0.0012196909,0.0000062834674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000459025,0.000008190593,0.00017738553,0.0066857506,0.00047357398,0.000004039325,0.0032649005,0.9113225,0.002501935,0.013848462,0.058040574,0.0036681152],"study_design_scores_gemma":[0.00024095418,0.000026966349,0.00012176085,0.0023643058,0.00014781869,0.00003493338,0.00002679143,0.6810016,0.0016738803,0.0020793614,0.31139234,0.0008892789],"about_ca_topic_score_codex":0.00085040263,"about_ca_topic_score_gemma":0.15418206,"teacher_disagreement_score":0.9689,"about_ca_system_score_codex":0.0009920738,"about_ca_system_score_gemma":0.00043043063,"threshold_uncertainty_score":0.9997358},"labels":[],"label_agreement":null},{"id":"W4402842510","doi":"10.1007/978-3-031-61515-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 8","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Engineering; Political science; Civil engineering; Engineering ethics; Library science; Environmental science; Environmental ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005354157838802051,"score_gpt":0.17737853719040267,"score_spread":0.17202437935160061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402842510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053046877,0.040400222,0.60905,0.0026920612,0.04844658,0.010309503,0.006797131,0.0057856403,0.27121422],"genre_scores_gemma":[0.97513974,0.0001440248,0.0038554973,0.00007631163,0.0016916214,0.00035767176,0.00011727844,0.00045847608,0.018159362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839985,0.0000016165931,0.00046015024,0.0003604192,0.00026285677,0.00051509636],"domain_scores_gemma":[0.9993243,0.00009716413,0.0000623609,0.00019894152,0.00020114591,0.00011604201],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015640812,0.0005247073,0.0004641366,0.00034017992,0.000058083588,0.000120562705,0.00037795855,0.00083658285,0.00008631838],"category_scores_gemma":[0.00012254722,0.0004899646,0.00041368578,0.00040402854,0.000048236176,0.00013498557,0.000046365414,0.001327389,0.0000071035206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005234797,0.000007481068,0.00009051563,0.006444287,0.00053493644,0.0000036011982,0.0031494976,0.9139877,0.0027092847,0.0117184995,0.05656132,0.0047876723],"study_design_scores_gemma":[0.00023490812,0.000029874062,0.000095085205,0.0023804482,0.00014466941,0.000033614295,0.000023909912,0.71480244,0.0017160258,0.0025105132,0.2771547,0.0008737948],"about_ca_topic_score_codex":0.0005806114,"about_ca_topic_score_gemma":0.08927114,"teacher_disagreement_score":0.96983504,"about_ca_system_score_codex":0.0009904702,"about_ca_system_score_gemma":0.00042599594,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W4402956418","doi":"10.18280/mmep.110903","title":"Particle Swarm Optimization and Tree Models (M5P) as Cost Estimation Tool for Construction Project","year":2024,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Estimation; Tree (set theory); Computer science; Data mining; Engineering; Machine learning; Mathematics; Systems engineering","score_opus":0.023668060134078225,"score_gpt":0.223355112125082,"score_spread":0.19968705199100378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402956418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019244097,0.00066883897,0.97849935,0.000048703925,0.00016729503,0.00049455115,0.0000064107226,0.00063848356,0.00023227234],"genre_scores_gemma":[0.7311275,0.00026175243,0.26814592,0.000003878219,0.000049752176,0.00030461923,0.000014798244,0.000043091906,0.00004868428],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993088,0.000004581202,0.00025214636,0.00017945078,0.000086861466,0.00016814053],"domain_scores_gemma":[0.9997542,0.00008138266,0.000012720604,0.00007461033,0.00003058766,0.000046484234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000112456335,0.00015118785,0.00014161378,0.000082454455,0.00005851599,0.00020178192,0.000025992884,0.00009405384,0.0000043775826],"category_scores_gemma":[0.0000146766715,0.0001408883,0.000027201659,0.000118125616,0.000027772427,0.0003330299,0.000007352593,0.00010398163,0.0000031987142],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025663012,0.000004549825,3.5083988e-7,0.0008439756,0.000019080087,2.0678627e-7,0.00034378856,0.8708043,0.00028248527,0.10629731,0.0000092497085,0.021392109],"study_design_scores_gemma":[0.00014605735,0.000029022516,1.3054807e-7,0.00026366295,0.000038195016,0.000056638626,0.00003172203,0.95738596,0.0011543512,0.040568743,0.00016331063,0.0001622051],"about_ca_topic_score_codex":0.000002809267,"about_ca_topic_score_gemma":2.4033173e-7,"teacher_disagreement_score":0.7118834,"about_ca_system_score_codex":0.00003076739,"about_ca_system_score_gemma":0.000010666287,"threshold_uncertainty_score":0.57452583},"labels":[],"label_agreement":null},{"id":"W4402977997","doi":"10.1145/3640310.3674085","title":"Toward Intelligent Generation of Tailored Graphical Concrete Syntax","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; École de Technologie Supérieure; Université de Montréal","funders":"","keywords":"Computer science; Syntax; Programming language; Human–computer interaction; Natural language processing","score_opus":0.027476778726008615,"score_gpt":0.2280989242891074,"score_spread":0.2006221455630988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402977997","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31857276,0.0014895347,0.65972686,0.00026324496,0.0025207147,0.00012179284,0.000007987044,0.0006604169,0.01663668],"genre_scores_gemma":[0.9984607,0.000115261995,0.001130302,0.000013613967,0.00011763421,0.000008997247,0.000011719362,0.000008182706,0.00013355982],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99964446,0.0000066302055,0.00014991521,0.00007198071,0.00007124654,0.000055778783],"domain_scores_gemma":[0.99987704,0.000011249514,0.0000050883054,0.00005761939,0.000025935286,0.000023055582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000037381556,0.00005595089,0.00006209472,0.00007626005,0.000009030004,0.000026874202,0.00002944642,0.00005339635,0.00039904006],"category_scores_gemma":[0.0000043026594,0.00004671399,0.00004652782,0.00013115378,0.000024689029,0.00007308363,0.0000038825274,0.00007004207,0.000038070095],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004988514,0.0000019762,0.00010174171,0.00015652063,0.000115683986,0.000003870985,0.00042672225,0.0017737646,0.39196867,0.5083086,0.008704703,0.08843276],"study_design_scores_gemma":[0.000047763373,0.000028076214,0.000049861585,0.00003092958,0.000019028246,0.000019198986,0.00014883718,0.5256929,0.46270594,0.0012836882,0.009863865,0.0001099281],"about_ca_topic_score_codex":0.000011746262,"about_ca_topic_score_gemma":0.000007444271,"teacher_disagreement_score":0.679888,"about_ca_system_score_codex":0.000016968997,"about_ca_system_score_gemma":0.000009161319,"threshold_uncertainty_score":0.43692088},"labels":[],"label_agreement":null},{"id":"W4403039909","doi":"10.1007/978-3-031-60415-7_10","title":"Reinforcement Learning for Design","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement; Reinforcement learning; Computer science; Psychology; Artificial intelligence; Social psychology","score_opus":0.011314443200765516,"score_gpt":0.19830078458390796,"score_spread":0.18698634138314243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403039909","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000020505602,0.0035817681,0.94038033,0.000025115794,0.0015376427,0.000346548,0.0000034509374,0.0006684493,0.053454615],"genre_scores_gemma":[0.8951966,0.0013600861,0.0273969,0.00008427639,0.0029682745,0.000631519,0.0002654836,0.0011325201,0.070964344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904644,0.0000019730674,0.000319285,0.00024226091,0.00013377043,0.0002562574],"domain_scores_gemma":[0.9995558,0.00019206794,0.00002772181,0.00015080954,0.000030751307,0.000042852596],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010078669,0.00038042475,0.0002849996,0.00036092682,0.000026025455,0.000058783084,0.00009771319,0.0004368882,0.00018629606],"category_scores_gemma":[0.000049030023,0.0004011805,0.0001342913,0.00006229252,0.000011610917,0.00005374469,0.000016812199,0.000852366,0.000039649218],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000396948,4.8103885e-7,4.7871725e-7,0.0003770434,0.000067801535,0.0000048133234,0.000088921835,0.9620738,0.0004275165,0.02268469,0.00011497717,0.014155484],"study_design_scores_gemma":[0.00013083752,0.000039161627,4.7021334e-7,0.00069857924,0.00004629927,0.000014673872,9.611348e-7,0.8513427,0.0013171561,0.013481225,0.13249142,0.000436531],"about_ca_topic_score_codex":0.0000017757853,"about_ca_topic_score_gemma":0.000041085885,"teacher_disagreement_score":0.9129835,"about_ca_system_score_codex":0.00025175462,"about_ca_system_score_gemma":0.000020216648,"threshold_uncertainty_score":0.999844},"labels":[],"label_agreement":null},{"id":"W4403040008","doi":"10.1007/978-3-031-60415-7","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 1","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Engineering; Political science; Environmental science; Library science; Aeronautics; Environmental ethics; Computer science; Physics; Philosophy; Thermodynamics","score_opus":0.005435987979092571,"score_gpt":0.17748494713711885,"score_spread":0.1720489591580263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403040008","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005295894,0.040400382,0.6082013,0.0027123757,0.048804596,0.01038549,0.007064129,0.0058640023,0.2712718],"genre_scores_gemma":[0.97475475,0.00014589394,0.003948931,0.00007739908,0.0017155553,0.00036898418,0.000121549994,0.00046604426,0.018400887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840015,0.0000016169073,0.00045984774,0.00036049148,0.00026285715,0.0005150352],"domain_scores_gemma":[0.99932325,0.00009783061,0.000062344436,0.00019913718,0.00020143269,0.00011603228],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015629207,0.00052467553,0.00046393258,0.00034021572,0.00005806235,0.000120302975,0.00037805145,0.0008365771,0.00008943691],"category_scores_gemma":[0.0001236249,0.0004899633,0.00041365565,0.00040429042,0.000048223254,0.00013488505,0.00004638339,0.001327458,0.0000071550357],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000522298,0.000007468202,0.00009089536,0.0063813813,0.0005342999,0.0000035475018,0.003139489,0.91205066,0.0027368185,0.011461756,0.05892916,0.004659291],"study_design_scores_gemma":[0.00023239595,0.000029682562,0.0000950377,0.0023705603,0.00014437649,0.000033480184,0.000023870773,0.71049714,0.0016789044,0.0024756242,0.2815482,0.0008707404],"about_ca_topic_score_codex":0.00057560095,"about_ca_topic_score_gemma":0.08831977,"teacher_disagreement_score":0.9694589,"about_ca_system_score_codex":0.0009900994,"about_ca_system_score_gemma":0.00042659862,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W4403040570","doi":"10.1007/978-3-031-60415-7_19","title":"BIM-Based Generative Design Processes for Targeted Value Design of Low-Carbon Buildings","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Generative Design; Generative grammar; Value (mathematics); Engineering; Architectural engineering; Computer science; Artificial intelligence; Chemical engineering; Machine learning","score_opus":0.012207681702561686,"score_gpt":0.1999629566577582,"score_spread":0.18775527495519653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403040570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000045967176,0.0073558996,0.9891658,0.000032350894,0.0009604848,0.00078119646,0.00005002576,0.0004674392,0.0011408451],"genre_scores_gemma":[0.6929364,0.0004956444,0.30261332,0.00006928421,0.0013843137,0.00074737536,0.00015178211,0.00086824736,0.00073358003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986403,0.000008421556,0.0004884109,0.00038125517,0.00018540141,0.00029622414],"domain_scores_gemma":[0.99891037,0.0005969779,0.00007998321,0.00020833625,0.00015169749,0.00005266624],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015930434,0.00056418777,0.000524766,0.0006110526,0.000022778739,0.00004571466,0.00016801387,0.0006035182,0.000031147825],"category_scores_gemma":[0.0001948941,0.0005696115,0.0001301238,0.00022336948,0.00003663173,0.00006260649,0.000013359547,0.0005675445,0.0000019749816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022348608,0.0000043519235,9.728155e-7,0.0021426298,0.000119512835,0.0000038664825,0.00011112319,0.9639168,0.021885542,0.010048576,0.000025613961,0.001718705],"study_design_scores_gemma":[0.00023932742,0.00007838302,5.425151e-7,0.001676407,0.00008644048,0.0000054131756,9.592255e-7,0.7759736,0.20020652,0.020331074,0.0008774483,0.0005238473],"about_ca_topic_score_codex":0.0000038996163,"about_ca_topic_score_gemma":0.000027538137,"teacher_disagreement_score":0.69289047,"about_ca_system_score_codex":0.00021997395,"about_ca_system_score_gemma":0.00014843243,"threshold_uncertainty_score":0.9996755},"labels":[],"label_agreement":null},{"id":"W4403042201","doi":"10.3390/buildings14103139","title":"Dynamic Spatiotemporal Scheduling for Construction Building Projects","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Scheduling (production processes); Computer science; Systems engineering; Engineering; Construction engineering; Architectural engineering; Operations management","score_opus":0.009689904598732053,"score_gpt":0.24149580656566075,"score_spread":0.23180590196692868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403042201","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35371363,0.0007806564,0.6394537,0.00013193881,0.0038313195,0.0002642529,0.000012469982,0.00110333,0.0007087033],"genre_scores_gemma":[0.8359946,0.000029666457,0.1635352,0.000012494682,0.00023251555,0.000073369796,0.000013283935,0.000036360776,0.00007252874],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934024,0.0000048106344,0.00019013844,0.00019645249,0.0000897603,0.00017861502],"domain_scores_gemma":[0.99977815,0.00003902904,0.000017982084,0.00008300975,0.000045333003,0.000036476864],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010270689,0.00012906737,0.00010190393,0.0001874638,0.00008059016,0.00016104185,0.000060106162,0.00009991338,0.00002514187],"category_scores_gemma":[0.000024191466,0.00013180231,0.00006316451,0.00023332554,0.00003603471,0.00030015607,0.000007786559,0.00013670286,0.000013476125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012278781,0.000005378708,0.00015328405,0.00061834074,0.00008200577,0.0000029224434,0.00031674874,0.006815691,0.2079092,0.21034214,0.0016098231,0.57213223],"study_design_scores_gemma":[0.0002481084,0.00004447222,0.000058787966,0.00034204943,0.00004527559,0.0001238327,0.0002657485,0.8291192,0.07641879,0.00882135,0.08415331,0.00035909237],"about_ca_topic_score_codex":0.000008651535,"about_ca_topic_score_gemma":0.000005208265,"teacher_disagreement_score":0.8223035,"about_ca_system_score_codex":0.00012925081,"about_ca_system_score_gemma":0.000037909536,"threshold_uncertainty_score":0.5374742},"labels":[],"label_agreement":null},{"id":"W4403241049","doi":"10.1007/978-3-031-61519-1","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 9","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Engineering ethics; Library science; Environmental ethics; Engineering; Law; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005358715726297616,"score_gpt":0.1774163197620674,"score_spread":0.17205760403576978,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403241049","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005289103,0.04042756,0.6099993,0.0026942545,0.048486356,0.010315139,0.006800672,0.0058232667,0.27016434],"genre_scores_gemma":[0.9752111,0.000145761,0.0038581986,0.00007644807,0.0016949159,0.00035615815,0.00011751121,0.0004595905,0.01808035],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983999,0.0000016165397,0.000460148,0.0003603842,0.0002628859,0.0005150586],"domain_scores_gemma":[0.99932444,0.00009715133,0.00006235427,0.00019889203,0.00020113571,0.000116028976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015638102,0.0005246544,0.00046407437,0.00034024735,0.00005808631,0.00012054238,0.00037772872,0.0008364669,0.00008598936],"category_scores_gemma":[0.00012254194,0.00048991584,0.0004136774,0.00040421425,0.000048235248,0.00013500037,0.000046354773,0.0013269883,0.0000070785322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005236275,0.0000074835843,0.000091136055,0.006445688,0.0005350063,0.000003601631,0.0031503467,0.91413534,0.0027279786,0.011585547,0.056625042,0.0046875663],"study_design_scores_gemma":[0.00023476181,0.000029818082,0.00009568674,0.002379695,0.00014461424,0.00003360284,0.000023907809,0.71459436,0.0016963567,0.002510217,0.2773836,0.000873408],"about_ca_topic_score_codex":0.00057125115,"about_ca_topic_score_gemma":0.08916529,"teacher_disagreement_score":0.96992195,"about_ca_system_score_codex":0.0009902981,"about_ca_system_score_gemma":0.00042579116,"threshold_uncertainty_score":0.99975526},"labels":[],"label_agreement":null},{"id":"W4403409717","doi":"10.1016/j.jclepro.2024.143892","title":"Building material reuse: An optimization framework for sourcing new and reclaimed building materials","year":2024,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reuse; Building material; Construction engineering; Architectural engineering; Waste management; Business; Engineering; Civil engineering","score_opus":0.013435986115996598,"score_gpt":0.2628508933940405,"score_spread":0.24941490727804388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403409717","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4669681,0.00027973545,0.5253454,0.00051721884,0.006670843,0.000102505706,0.000002608652,0.00010465481,0.000008969832],"genre_scores_gemma":[0.64864886,0.00014942027,0.3453783,0.000009787742,0.005727554,0.0000040853256,0.0000043111086,0.00004147137,0.00003620337],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99916166,0.000030720257,0.00041295806,0.0001475649,0.00012512655,0.00012195063],"domain_scores_gemma":[0.9995793,0.000026229867,0.00010736273,0.00012186657,0.000100013276,0.00006523685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044537513,0.000115572664,0.00016386548,0.00021832118,0.00007963458,0.00031322846,0.00007574323,0.0001188154,0.00005675745],"category_scores_gemma":[0.00016993546,0.00010464636,0.000038024118,0.00011851689,0.000017388698,0.0008935323,0.000010052454,0.00015754784,5.4158687e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001345893,0.00000757674,0.000010337659,0.00020913812,0.00006861179,0.0000020211726,0.000511309,0.2714726,0.62288594,0.0062219,0.0022843948,0.09619158],"study_design_scores_gemma":[0.0002440331,0.00016447771,0.000053072574,0.00072846626,0.00013857835,0.0008116672,0.00022982495,0.03388204,0.92201805,0.02739111,0.014085541,0.00025316273],"about_ca_topic_score_codex":0.0000035219139,"about_ca_topic_score_gemma":6.270905e-7,"teacher_disagreement_score":0.29913208,"about_ca_system_score_codex":0.000075060845,"about_ca_system_score_gemma":0.000030387473,"threshold_uncertainty_score":0.42673546},"labels":[],"label_agreement":null},{"id":"W4403439585","doi":"10.1007/978-3-031-62170-3_17","title":"Monte Carlo-Enabled Dynamic Multiple-Criteria Decision Analysis for Selecting Sustainable Construction Methods: A Wind Farm Case Study","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Monte Carlo method; Computer science; Operations research; Mathematical optimization; Engineering; Mathematics; Statistics","score_opus":0.009546911689743368,"score_gpt":0.2668822892831484,"score_spread":0.257335377593405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016113637,0.003200921,0.9750496,0.000009490393,0.0019161551,0.001475486,0.0000546276,0.00081864337,0.0013614063],"genre_scores_gemma":[0.94353956,0.00005405431,0.054216765,0.0000057441202,0.00026726475,0.00017278646,0.00003420454,0.0002680253,0.0014416086],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974879,0.000026063117,0.0008753062,0.0007732,0.0002441764,0.0005933661],"domain_scores_gemma":[0.99805725,0.0010253985,0.00011381862,0.00045993202,0.0002409182,0.00010267237],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005427406,0.0007969365,0.0009770524,0.0021152673,0.00014070288,0.00026972668,0.00017190515,0.00069078815,0.00007108817],"category_scores_gemma":[0.00037696952,0.00084227044,0.00043241974,0.00082718517,0.000030187151,0.00017077095,0.00006616839,0.0011908191,0.000002755765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028602497,0.000011037361,0.00012723106,0.0006080515,0.0014241483,0.00045921048,0.0010469952,0.95353425,0.00051963155,0.0006098071,0.0000034087277,0.04162762],"study_design_scores_gemma":[0.0006264926,0.000083995335,0.000015686623,0.00032393276,0.0013876394,0.0008756513,0.0005980978,0.9891743,0.00019058395,0.003566445,0.0023067752,0.0008503971],"about_ca_topic_score_codex":0.0002896183,"about_ca_topic_score_gemma":0.010347564,"teacher_disagreement_score":0.9274259,"about_ca_system_score_codex":0.0009567639,"about_ca_system_score_gemma":0.00005437343,"threshold_uncertainty_score":0.9994028},"labels":[],"label_agreement":null},{"id":"W4403439587","doi":"10.1007/978-3-031-62170-3_18","title":"The Use of BIM in Railway Projects","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Architectural engineering; Construction engineering; Transport engineering; Engineering","score_opus":0.016371024933627704,"score_gpt":0.19575082548165879,"score_spread":0.17937980054803107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004733381,0.09612086,0.5874369,0.00084834005,0.02650657,0.004197771,0.00026312305,0.0037804854,0.27611256],"genre_scores_gemma":[0.9894196,0.001803084,0.0019506988,0.000025651283,0.0005294999,0.00009432194,0.000030464264,0.00032402534,0.0058226963],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904776,0.000003718512,0.00038540355,0.00019546285,0.00015485783,0.0002127951],"domain_scores_gemma":[0.99935526,0.00031007463,0.000033120446,0.00025116012,0.000026429369,0.000023968534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008251587,0.00030307457,0.00027366294,0.00042162533,0.000013702221,0.00005642976,0.00012660786,0.00037821342,0.000037485566],"category_scores_gemma":[0.00008322835,0.00024403681,0.00009511053,0.00016364006,0.00003169191,0.00007398163,0.000026564143,0.0009195871,0.000011071831],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055783926,0.0000022174245,0.000027919428,0.0004659301,0.00006760986,0.000019282468,0.0002503193,0.9008431,0.0006954701,0.062437315,0.000091097616,0.035094168],"study_design_scores_gemma":[0.00032720136,0.00004277995,0.00009534996,0.003763993,0.00006008592,0.00005572461,0.0000061937076,0.583534,0.003979707,0.023289701,0.38384482,0.0010004388],"about_ca_topic_score_codex":0.000020463605,"about_ca_topic_score_gemma":0.0023166304,"teacher_disagreement_score":0.9846862,"about_ca_system_score_codex":0.00015411552,"about_ca_system_score_gemma":0.000026838881,"threshold_uncertainty_score":0.99515325},"labels":[],"label_agreement":null},{"id":"W4403439604","doi":"10.1007/978-3-031-62170-3_31","title":"Applications of Travelling Salesman Optimization in Construction Scheduling","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Travelling salesman problem; Mathematical optimization; Computer science; Scheduling (production processes); Operations research; Mathematics","score_opus":0.005453663815352953,"score_gpt":0.18756405898391526,"score_spread":0.1821103951685623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009126377,0.0034131673,0.9650901,0.000015781057,0.0006761825,0.00029306978,0.00001842903,0.0002838066,0.030118179],"genre_scores_gemma":[0.9304549,0.0013815947,0.06653701,0.000008256054,0.0005508936,0.0001332,0.00016372936,0.00027200475,0.0004983902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988562,0.0000030745641,0.0005501597,0.00026667034,0.00014490627,0.00017900688],"domain_scores_gemma":[0.9995815,0.00008730982,0.00006131356,0.00019390107,0.00004285548,0.000033084416],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008507045,0.0003165402,0.00034028984,0.00089344423,0.000014753434,0.000027393215,0.00010146169,0.00051062024,0.00011413594],"category_scores_gemma":[0.000017038845,0.0003750078,0.00009090837,0.0002571438,0.00003654597,0.000080857906,0.000013856986,0.00082051125,0.000008363626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000018126196,0.0000022096206,0.00001858247,0.00046449347,0.000029560724,0.0000024372648,0.00010440566,0.94270307,0.0004349501,0.036547333,7.1646014e-7,0.01969045],"study_design_scores_gemma":[0.00014269601,0.000008341705,0.0000050871504,0.0012646193,0.000037848426,0.00002817836,0.0000066553534,0.9799042,0.0014442604,0.0150271915,0.0017599057,0.0003710129],"about_ca_topic_score_codex":0.000007818831,"about_ca_topic_score_gemma":0.00025468026,"teacher_disagreement_score":0.93036366,"about_ca_system_score_codex":0.00021542041,"about_ca_system_score_gemma":0.000027655404,"threshold_uncertainty_score":0.9998702},"labels":[],"label_agreement":null},{"id":"W4403439699","doi":"10.1007/978-3-031-62170-3_20","title":"An Analysis of Extended Reality Research in the Construction Industry","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario College of Art and Design; George Brown College","funders":"","keywords":"Business","score_opus":0.028645686129654836,"score_gpt":0.28810400139785464,"score_spread":0.2594583152681998,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439699","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05389134,0.017364323,0.35421026,0.0012018876,0.008005225,0.0027906469,0.0007067037,0.0021284942,0.5597011],"genre_scores_gemma":[0.99910605,0.00013211175,0.0002947295,0.0000068130125,0.00020368524,0.000026979993,0.00006760815,0.000051777348,0.00011022015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985815,0.000031904707,0.00046366962,0.0003010487,0.00038033488,0.00024149688],"domain_scores_gemma":[0.9991201,0.00027022258,0.00003773833,0.00046642203,0.00006911836,0.000036365276],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0006247597,0.0002651669,0.00040251232,0.0019120409,0.00002171064,0.000054242093,0.00023858716,0.0009558308,0.00014145004],"category_scores_gemma":[0.000042137748,0.00022954095,0.00013346241,0.0010177157,0.000085844724,0.00008353859,0.000018909925,0.002973325,0.0000032068233],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054932975,0.0000068786417,0.00014930808,0.00024154689,0.00025896556,0.000018910865,0.0005160376,0.8984407,0.00054335647,0.08051228,0.000010759435,0.019295769],"study_design_scores_gemma":[0.00021796845,0.000067429144,0.0034749387,0.0011648522,0.0005448343,0.00005978581,0.00014340703,0.91377705,0.0011266893,0.0735942,0.005081787,0.0007470822],"about_ca_topic_score_codex":0.00009729007,"about_ca_topic_score_gemma":0.0030241746,"teacher_disagreement_score":0.94521475,"about_ca_system_score_codex":0.00024716707,"about_ca_system_score_gemma":0.00003437615,"threshold_uncertainty_score":0.9993269},"labels":[],"label_agreement":null},{"id":"W4403439763","doi":"10.1007/978-3-031-62170-3_25","title":"Development of a Machine-Learning Enhanced Modular Residential Construction Direct Cost Estimation Method","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Estimation; Computer science; Direct cost; Cost estimate; Artificial intelligence; Machine learning; Engineering; Indirect costs; Systems engineering; Economics; Programming language; Management","score_opus":0.006696607255699696,"score_gpt":0.21744406615007258,"score_spread":0.21074745889437288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439763","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0002143122,0.0018229337,0.9670176,0.000007720774,0.0014435498,0.00026526197,0.000015450249,0.0005096862,0.028703494],"genre_scores_gemma":[0.706121,0.00021090485,0.29161966,0.000004632536,0.00030178632,0.000090228874,0.00019541649,0.00025480983,0.0012015335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985459,0.000010165176,0.00063052535,0.00032906697,0.00026675768,0.00021762103],"domain_scores_gemma":[0.99948996,0.00012823043,0.00009953337,0.0001770794,0.000058575955,0.000046618872],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018480653,0.00042703166,0.00046155133,0.00063273427,0.000038949544,0.00004729462,0.00010468654,0.00047621678,0.00016630338],"category_scores_gemma":[0.00008290481,0.00046999546,0.00012047562,0.00015588028,0.000024446752,0.000099095225,0.000032005264,0.000959469,0.000017490698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061450223,0.0000015969852,0.0000014711866,0.0004970616,0.000117006144,0.0000049080313,0.00038463128,0.84577245,0.015671855,0.0045789457,0.0000022034073,0.13296172],"study_design_scores_gemma":[0.0001817463,0.000012144857,0.0000073160127,0.0013337566,0.00007864237,0.000042965723,0.00000428055,0.908233,0.07779104,0.0034347633,0.008375354,0.0005050051],"about_ca_topic_score_codex":0.000010300041,"about_ca_topic_score_gemma":0.000386552,"teacher_disagreement_score":0.70590675,"about_ca_system_score_codex":0.00032431987,"about_ca_system_score_gemma":0.000051967672,"threshold_uncertainty_score":0.9997752},"labels":[],"label_agreement":null},{"id":"W4403439965","doi":"10.1007/978-3-031-62170-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 3","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Environmental ethics; Regional science; Environmental planning; Library science; Geography; Computer science; Law; Philosophy; Thermodynamics; Physics","score_opus":0.005347599011916901,"score_gpt":0.17724203849994952,"score_spread":0.17189443948803262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439965","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053041223,0.040388815,0.6081961,0.0026888114,0.0489714,0.01033667,0.0069372663,0.0058301636,0.2713467],"genre_scores_gemma":[0.974638,0.0001467518,0.0038848645,0.000076863,0.001721555,0.00036082527,0.0001190246,0.00046309573,0.018589014],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984001,0.0000016155772,0.00046002248,0.00036035717,0.00026290285,0.0005150013],"domain_scores_gemma":[0.9993227,0.000097090466,0.000062352796,0.00019888194,0.00020294901,0.00011602378],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015623157,0.0005246125,0.00046397303,0.00034011874,0.00005805808,0.00012051403,0.0003778484,0.0008365164,0.000087553664],"category_scores_gemma":[0.00012359655,0.00048985664,0.0004136331,0.00040416233,0.000048226182,0.00013497368,0.00004635475,0.0013272265,0.000007221815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052584705,0.0000074775435,0.000091151815,0.0064848824,0.00053480716,0.0000035899625,0.0031448375,0.91388077,0.0027472153,0.011419599,0.056954846,0.0047255903],"study_design_scores_gemma":[0.0002340495,0.000029509238,0.000094108065,0.0023552682,0.00014260103,0.000033058615,0.00002366345,0.70784545,0.0017020055,0.0024702584,0.2842033,0.0008667732],"about_ca_topic_score_codex":0.0005811739,"about_ca_topic_score_gemma":0.08878667,"teacher_disagreement_score":0.9693339,"about_ca_system_score_codex":0.0009934505,"about_ca_system_score_gemma":0.00042680002,"threshold_uncertainty_score":0.9997553},"labels":[],"label_agreement":null},{"id":"W4403439988","doi":"10.1007/978-3-031-62170-3_1","title":"Automated Identification and Impact Quantification of Financial Budget Items from Construction Data","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Identification (biology); Business; Finance; Computer science","score_opus":0.0118239432839572,"score_gpt":0.22974093036711188,"score_spread":0.21791698708315468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439988","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014735758,0.023999851,0.936832,0.00010565674,0.008902486,0.0009661779,0.0035177295,0.0034417834,0.0074985353],"genre_scores_gemma":[0.9958921,0.00052669697,0.0013628063,0.0000029304456,0.00032972088,0.000011767521,0.0016294329,0.00009621502,0.00014830625],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987263,0.0000053175377,0.0005553644,0.0003986337,0.0001700282,0.00014435158],"domain_scores_gemma":[0.99916726,0.00012000388,0.000106564214,0.0005114403,0.00005515854,0.000039594124],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00011789794,0.00033002446,0.00034445067,0.00043227553,0.00002004068,0.000075560405,0.00017683361,0.00051654124,0.00007195897],"category_scores_gemma":[0.00009816788,0.00034602484,0.000061586834,0.0001396599,0.000052027233,0.0001985345,0.000042882704,0.0005224508,0.000013192387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026748361,0.000012679942,0.00031387885,0.0014343188,0.00040041195,0.000012318079,0.00047548933,0.73591787,0.07993273,0.03170844,0.00068227504,0.14908285],"study_design_scores_gemma":[0.0001421806,0.000013141276,0.001243327,0.0007227465,0.00010597825,0.000028192098,0.0000022105125,0.9791594,0.0038150547,0.011729956,0.0026602128,0.0003775945],"about_ca_topic_score_codex":0.00007500357,"about_ca_topic_score_gemma":0.00041338356,"teacher_disagreement_score":0.98115635,"about_ca_system_score_codex":0.00013328397,"about_ca_system_score_gemma":0.000040418974,"threshold_uncertainty_score":0.99989915},"labels":[],"label_agreement":null},{"id":"W4403440116","doi":"10.1007/978-3-031-62170-3_28","title":"Optimal Space Layout Generation for Modular Offsite Construction for Whole Life Cycle Costs—Gaps and Requirements","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Modular design; Modular construction; Space (punctuation); Computer science; Architectural engineering; Engineering; Programming language","score_opus":0.01067583669584899,"score_gpt":0.21078312832741217,"score_spread":0.20010729163156318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403440116","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001802737,0.006802455,0.9848663,0.00014345303,0.0027664998,0.0008594335,0.00023626156,0.00039661935,0.0021262446],"genre_scores_gemma":[0.8512657,0.00093275314,0.13573489,0.00011073364,0.0049824906,0.0007916607,0.0013957924,0.0007536782,0.004032292],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886554,0.0000027469728,0.0003568585,0.00038417397,0.00013791524,0.0002527488],"domain_scores_gemma":[0.9995418,0.00007939634,0.00005184292,0.00018033203,0.000071926705,0.000074658165],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009979772,0.00039814936,0.00033741342,0.00031512752,0.000054003747,0.000113854825,0.0000672279,0.00048378468,0.00002451296],"category_scores_gemma":[0.00006432682,0.00044618797,0.0001159615,0.000059771734,0.000030381101,0.00014566944,0.000019797973,0.00037099264,0.000005095332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013296064,0.0000022461768,0.000005243221,0.0007340489,0.00013466182,0.0000015371521,0.000103664555,0.9472745,0.009350655,0.025536506,0.00016479024,0.01667887],"study_design_scores_gemma":[0.0004311903,0.00004868861,0.0000035968,0.00047725896,0.00009207565,0.000022012633,0.000005297919,0.93726104,0.0021386978,0.0026280647,0.056413565,0.0004785275],"about_ca_topic_score_codex":0.000004944051,"about_ca_topic_score_gemma":0.00017262637,"teacher_disagreement_score":0.849463,"about_ca_system_score_codex":0.00025960628,"about_ca_system_score_gemma":0.000025692016,"threshold_uncertainty_score":0.999799},"labels":[],"label_agreement":null},{"id":"W4403516385","doi":"","title":"L'interopérabilité BIM multi métiers : la collaboration par la requête","year":2020,"lang":"fr","type":"book-chapter","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Business","score_opus":0.010266359358560387,"score_gpt":0.21464959655231586,"score_spread":0.20438323719375548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403516385","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003486836,0.0045359954,0.8952012,0.009726563,0.0019270146,0.0021237363,0.00074350764,0.0028069925,0.07944813],"genre_scores_gemma":[0.6826298,0.0040015522,0.2776945,0.0015950698,0.0012415509,0.0012135834,0.0004962565,0.0008460405,0.030281631],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9959021,0.00034475644,0.0013645936,0.0010359746,0.0005704898,0.00078207784],"domain_scores_gemma":[0.99702036,0.00032501837,0.00051744725,0.001074238,0.00041571297,0.0006472298],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0006415067,0.0011989508,0.001001384,0.00067851134,0.0003553618,0.0005808586,0.0006171679,0.0021857766,0.00047606585],"category_scores_gemma":[0.0003108679,0.0013871583,0.00054896733,0.00048170722,0.000609921,0.00067924446,0.00018426671,0.0021129313,0.00028347748],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012769636,0.0000794686,0.0019111404,0.00029867314,0.0003433777,0.00013856146,0.0004876487,0.0053128614,0.0074417917,0.90050375,0.0023927873,0.08096224],"study_design_scores_gemma":[0.0018464178,0.00045537204,0.004058708,0.0011715834,0.0005889201,0.00073456415,0.0006269765,0.3438656,0.013421981,0.028761525,0.6015948,0.0028735287],"about_ca_topic_score_codex":0.0027670607,"about_ca_topic_score_gemma":0.004599249,"teacher_disagreement_score":0.87174225,"about_ca_system_score_codex":0.0014487121,"about_ca_system_score_gemma":0.0005990757,"threshold_uncertainty_score":0.99910957},"labels":[],"label_agreement":null},{"id":"W4403531947","doi":"10.5194/isprs-annals-x-4-2024-141-2024","title":"Semantic Segmentation Uncertainty Assessment of Different U-net Architectures for Extracting Building Footprints","year":2024,"lang":"en","type":"article","venue":"ISPRS annals of the photogrammetry, remote sensing and spatial information sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Segmentation; Computer science; Artificial intelligence; Natural language processing","score_opus":0.03155067032171511,"score_gpt":0.32457193545459223,"score_spread":0.29302126513287713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403531947","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42965442,0.000049676793,0.56912774,0.0001531628,0.00051617867,0.000169236,0.000010711451,0.000036046724,0.0002828196],"genre_scores_gemma":[0.99646884,0.00003408572,0.0034137696,0.000036315625,0.00003452289,5.935041e-7,0.000004115661,0.000004481992,0.0000032671894],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99909556,0.000029701647,0.00038534426,0.00009089864,0.00025853873,0.00013994733],"domain_scores_gemma":[0.99948823,0.00015812772,0.0001350234,0.00008497906,0.00010438039,0.000029248837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004434464,0.00010561025,0.00013905224,0.00021949643,0.00015272608,0.00015317785,0.00007293474,0.00004295333,0.0000024596616],"category_scores_gemma":[0.00007280063,0.00007112074,0.000090648035,0.0002892357,0.00013542142,0.0000958807,0.000021225524,0.000097675154,1.2038694e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000045879437,0.0000022851846,0.00009338698,0.00018872155,0.00002347793,3.3881946e-8,0.00041360653,0.025923735,0.013096543,0.00009345417,0.000021222904,0.9601389],"study_design_scores_gemma":[0.00006482074,0.00004448391,0.0014185564,0.0002124364,0.0000140426955,0.000009001637,0.0004756688,0.90710485,0.08829436,0.0020746882,0.00021461322,0.00007250337],"about_ca_topic_score_codex":0.0065831956,"about_ca_topic_score_gemma":0.0011738742,"teacher_disagreement_score":0.96006644,"about_ca_system_score_codex":0.000015426493,"about_ca_system_score_gemma":0.000027564,"threshold_uncertainty_score":0.9951866},"labels":[],"label_agreement":null},{"id":"W4403658556","doi":"10.1007/978-981-97-8237-6_25","title":"Inclusive Approach in Advancing Sustainability in Road Construction","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"EXP (Canada); Ministry of Transportation of Ontario","funders":"","keywords":"Sustainability; Road construction; Construction engineering; Environmental planning; Transport engineering; Engineering; Architectural engineering; Environmental science; Ecology","score_opus":0.003199439227290568,"score_gpt":0.19566182640351973,"score_spread":0.19246238717622915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403658556","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076395334,0.019556934,0.6250336,0.00037837343,0.006787237,0.0025700016,0.00006618529,0.0020078933,0.3359602],"genre_scores_gemma":[0.99618673,0.00020665636,0.002648481,0.000012489323,0.00029498653,0.000095410476,0.000047104342,0.00015245074,0.00035570335],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982758,0.000009917768,0.0006158851,0.00048124985,0.00019846618,0.00041869128],"domain_scores_gemma":[0.9994593,0.000109703666,0.00004405341,0.0002783659,0.00005445432,0.000054086868],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00021406953,0.00050877285,0.00052057806,0.0011959906,0.000018469464,0.000046725363,0.00014069158,0.0007340877,0.000062846986],"category_scores_gemma":[0.00012390043,0.00057466363,0.00010723127,0.00034800713,0.000047870846,0.00016364203,0.000064086205,0.0019198939,0.0000066338685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000068847958,0.0000055393907,0.00020414,0.0009810805,0.000022405362,0.000043173095,0.0005322812,0.93000287,0.00012092201,0.023761665,0.000005215908,0.044313837],"study_design_scores_gemma":[0.0005897801,0.00002872328,0.00040447817,0.0019146175,0.000035628098,0.00015227003,0.00011475803,0.85357225,0.00041245687,0.13485599,0.006615279,0.0013037804],"about_ca_topic_score_codex":0.00008589085,"about_ca_topic_score_gemma":0.003157979,"teacher_disagreement_score":0.9885472,"about_ca_system_score_codex":0.002254336,"about_ca_system_score_gemma":0.000089566645,"threshold_uncertainty_score":0.9996705},"labels":[],"label_agreement":null},{"id":"W4403740748","doi":"10.1016/j.jobe.2024.111008","title":"Structural and embodied carbon performance optimization for low carbon buildings through BIM-based integrated design","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Embodied cognition; Carbon fibers; Architectural engineering; Building information modeling; Engineering; Computer science; Materials science; Composite material; Composite number; Compatibility (geochemistry)","score_opus":0.010179712833511273,"score_gpt":0.208708792839235,"score_spread":0.19852908000572372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403740748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4232582,0.0011340254,0.5740954,0.000023698909,0.0011984594,0.00009512068,0.0000019190686,0.00016186846,0.000031293934],"genre_scores_gemma":[0.84220254,0.000096127114,0.15740412,0.0000055622427,0.00023200538,0.000008815876,0.0000019446536,0.000046111087,0.0000027376364],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916124,0.000008934126,0.00037870128,0.00011929646,0.00014227205,0.00018956636],"domain_scores_gemma":[0.99960583,0.00009423917,0.0000611983,0.00006798598,0.00011671498,0.00005401341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001997691,0.00019351263,0.0002203132,0.00029967417,0.000036942587,0.00012721073,0.00008325666,0.0001062698,0.000004045851],"category_scores_gemma":[0.000046448058,0.00017197692,0.000068993875,0.00027154273,0.000017219156,0.0003185407,0.0000061096225,0.00028545648,5.5044183e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020588208,0.0000014902971,0.000043615746,0.0003114368,0.000056266268,0.0000031354575,0.00009670056,0.976111,0.017968697,0.00067081605,0.000019695135,0.004696568],"study_design_scores_gemma":[0.00029626169,0.00008355202,0.000023180246,0.0006184641,0.000051337225,0.000093508475,0.000022577908,0.96054316,0.03775705,0.00008113964,0.00025342783,0.0001763195],"about_ca_topic_score_codex":0.0000044045887,"about_ca_topic_score_gemma":3.133563e-7,"teacher_disagreement_score":0.4189444,"about_ca_system_score_codex":0.00016504509,"about_ca_system_score_gemma":0.000046540736,"threshold_uncertainty_score":0.7013015},"labels":[],"label_agreement":null},{"id":"W4403764198","doi":"10.24908/pceea.2023.17095","title":"Employing AI to Help Evaluate Accumulating Student Perspective in Curricular Design","year":2024,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Perspective (graphical); Mathematics education; Psychology; Engineering ethics; Cognitive science; Computer science; Engineering; Artificial intelligence","score_opus":0.010942900314812024,"score_gpt":0.26757223314826145,"score_spread":0.2566293328334494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403764198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96789265,0.0013631458,0.0038549888,0.008773374,0.008436108,0.0018197242,0.00002472816,0.00076440786,0.007070876],"genre_scores_gemma":[0.9979994,0.000008290018,0.0012090963,0.000117488984,0.0001887066,0.00013632295,0.0000019000993,0.000040498067,0.00029828624],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99892807,0.0000090900785,0.00028697905,0.0001941231,0.00031223812,0.00026950092],"domain_scores_gemma":[0.9992409,0.00004608736,0.00005453815,0.00006824313,0.00045591273,0.00013436643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052682235,0.00015490381,0.00013951461,0.00058833766,0.00008285153,0.00022954331,0.0001860244,0.00011687598,0.000024592871],"category_scores_gemma":[0.0004642383,0.00015598473,0.00006926903,0.0010356667,0.000006072141,0.00031443418,0.000014739326,0.000306116,0.000019015451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005060541,0.00007214663,0.11546674,0.0006871528,0.00042849343,9.2178465e-7,0.02582867,0.6762302,0.022795247,0.10248922,0.03973227,0.016263861],"study_design_scores_gemma":[0.0004986578,0.00006387,0.2767267,0.0026514393,0.00021331132,0.000022373006,0.009339,0.66493654,0.015791534,0.004157504,0.024233505,0.0013655584],"about_ca_topic_score_codex":0.0028767416,"about_ca_topic_score_gemma":0.002939348,"teacher_disagreement_score":0.16125996,"about_ca_system_score_codex":0.0055994126,"about_ca_system_score_gemma":0.00039246894,"threshold_uncertainty_score":0.99821794},"labels":[],"label_agreement":null},{"id":"W4403842269","doi":"10.1016/j.plas.2024.100160","title":"How does building information modeling influence decision-making process in the project design? An input, process and output analysis","year":2024,"lang":"en","type":"article","venue":"Project Leadership and Society","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; HEC Montréal","funders":"","keywords":"Decision analysis; Computer science; Decision-making; Process (computing); Design process; Management science; Engineering; Mathematics; Operations management; Work in process; Statistics","score_opus":0.03807971579096417,"score_gpt":0.2948443897710444,"score_spread":0.2567646739800802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403842269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6791019,0.00052706053,0.3195859,0.00013583079,0.000055589873,0.0003801317,0.0000036968945,0.00017806252,0.000031856292],"genre_scores_gemma":[0.99613214,0.0001300804,0.0034316692,0.000110579196,0.000051160972,0.00012504932,0.000005644788,0.000011461145,0.0000022444103],"study_design_codex":"qualitative","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990721,0.0000479269,0.0002248856,0.00021220847,0.00022844665,0.00021446607],"domain_scores_gemma":[0.9996484,0.00011972219,0.000030526346,0.00010247248,0.00007815599,0.000020759539],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005809358,0.00016975097,0.00015312943,0.00025252526,0.00016009525,0.0009589471,0.00011802152,0.00013306536,4.503036e-7],"category_scores_gemma":[0.00005849285,0.000108270826,0.0000635762,0.0012119467,0.000057786125,0.0023230473,0.000009876817,0.00033264054,1.8592515e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033022938,0.000019821206,0.0048341397,0.002482433,0.00034564003,0.000002540089,0.5060316,0.288293,0.000113376176,0.0009128952,0.00004143371,0.1968901],"study_design_scores_gemma":[0.00008010674,0.000017075987,0.00019724936,0.00019013388,0.00008724423,0.000009445361,0.12184874,0.876072,0.00006663313,0.0012487819,0.00002748871,0.00015510862],"about_ca_topic_score_codex":0.000024412375,"about_ca_topic_score_gemma":0.00003617707,"teacher_disagreement_score":0.587779,"about_ca_system_score_codex":0.000041682913,"about_ca_system_score_gemma":0.000075716365,"threshold_uncertainty_score":0.9247149},"labels":[],"label_agreement":null},{"id":"W4404014467","doi":"10.2118/222174-ms","title":"How to do Fast-Track Projects","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Track (disk drive); Computer science; Operating system","score_opus":0.009240955506251447,"score_gpt":0.21077488447675097,"score_spread":0.20153392897049952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404014467","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14696707,0.00096492236,0.35228568,0.0032787356,0.0052108383,0.0003694358,0.000009034902,0.0037229925,0.4871913],"genre_scores_gemma":[0.98827285,0.0000062130202,0.0016049395,0.00003266725,0.0001379978,0.000017309409,0.0000010410612,0.000008998211,0.009918002],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997905,0.0000016290657,0.000035888617,0.00006537587,0.000044511213,0.00006207905],"domain_scores_gemma":[0.9999063,0.000004588801,9.623781e-7,0.00005211192,0.00001093914,0.000025115714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000014440119,0.00004284702,0.0000285164,0.000052996624,0.000009267266,0.0001774344,0.000024192863,0.000025922198,0.00015685047],"category_scores_gemma":[0.0000028676411,0.000033868626,0.000016894392,0.00013049156,0.00000349211,0.00010654174,0.000003219805,0.000049631875,0.00026005518],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011674662,0.0000025172455,0.00006740434,0.00007799425,0.000025192536,0.0000044853114,0.00065274787,0.00046000068,0.013603033,0.12746552,0.08619574,0.7714442],"study_design_scores_gemma":[0.000055162,0.000031821983,0.0002854672,0.00006158161,0.000008639865,0.00003726362,0.0012425117,0.032250326,0.05171498,0.0009761872,0.9131139,0.00022217866],"about_ca_topic_score_codex":0.000002721352,"about_ca_topic_score_gemma":0.000016320233,"teacher_disagreement_score":0.8413058,"about_ca_system_score_codex":0.000016582626,"about_ca_system_score_gemma":0.000006122764,"threshold_uncertainty_score":0.334257},"labels":[],"label_agreement":null},{"id":"W4404198497","doi":"10.1016/j.engstruct.2024.119269","title":"Enhancing seismic resilience in modular steel building through three-dimensional isolation","year":2024,"lang":"en","type":"article","venue":"Engineering Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Resilience (materials science); Modular design; Seismic isolation; Isolation (microbiology); Structural engineering; Engineering; Forensic engineering; Geology; Architectural engineering; Civil engineering; Computer science; Materials science; Composite material; Biology","score_opus":0.004537438532838836,"score_gpt":0.20714550540981755,"score_spread":0.20260806687697872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404198497","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.51907134,0.0021189167,0.47654217,0.000028660295,0.001498663,0.00007825655,0.000004072493,0.00055396534,0.000103924816],"genre_scores_gemma":[0.97672695,0.000013331499,0.022950377,0.00001658053,0.00021235694,0.000015133732,0.000006581525,0.00003912287,0.000019585075],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991175,0.0000069428343,0.0002495516,0.00022683326,0.00016766471,0.00023151308],"domain_scores_gemma":[0.99975294,0.000050214956,0.000011438132,0.00013721701,0.000017027398,0.000031134576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000073434625,0.00018801444,0.00013321303,0.00020150458,0.00003894637,0.00008435651,0.000090157475,0.0001140302,0.000043955763],"category_scores_gemma":[0.000021565389,0.000188013,0.00004810626,0.0003559535,0.000016154196,0.00038397554,0.00001566562,0.00033573975,0.000008930368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015266827,8.0877834e-7,0.000038253624,0.00008696149,0.000013843852,0.000007314503,0.00015566642,0.87774676,0.10557763,0.013031229,0.00005761926,0.0032823777],"study_design_scores_gemma":[0.00007366182,0.000007775882,0.0035512259,0.0001900675,0.0000066967664,0.00003921351,0.000019364512,0.9547373,0.035065167,0.0048760516,0.0012288253,0.00020465832],"about_ca_topic_score_codex":0.000036314177,"about_ca_topic_score_gemma":0.000019305095,"teacher_disagreement_score":0.45765558,"about_ca_system_score_codex":0.00012778083,"about_ca_system_score_gemma":0.000020047319,"threshold_uncertainty_score":0.7666947},"labels":[],"label_agreement":null},{"id":"W4404251702","doi":"10.20533/ijcdse.2042.6364.2024.0610","title":"A Transformative Investigation of an Inclusive and Positive IEP Framework","year":2024,"lang":"en","type":"article","venue":"International Journal for Cross-Disciplinary Subjects in Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Transformative learning; Psychology; Pedagogy; Sociology; Mathematics education","score_opus":0.008748660055980245,"score_gpt":0.34001137156876715,"score_spread":0.3312627115127869,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404251702","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94810957,0.002708235,0.039971273,0.00056970585,0.0076562096,0.00024141517,0.000096308286,0.00007114525,0.00057612173],"genre_scores_gemma":[0.9941838,0.00028487635,0.004632361,0.000027538983,0.0006302743,0.00004704509,0.0001315006,0.000021231324,0.000041412866],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99909675,0.00003232069,0.0003997759,0.00014896845,0.00020862883,0.00011357459],"domain_scores_gemma":[0.9993196,0.00019632644,0.000052097163,0.000056215857,0.0003080243,0.000067708286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027103053,0.00012613335,0.000108860215,0.0005209148,0.00010610807,0.00036218754,0.00013531437,0.00012107343,0.000026681591],"category_scores_gemma":[0.000041283496,0.00012284357,0.00006287257,0.0002244023,0.00011172723,0.0018573186,0.00001332729,0.00030452656,0.0000015020289],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036208532,0.00015125018,0.0050957217,0.0006041017,0.00036318577,0.00002405554,0.093376815,0.01034575,0.0086451555,0.14641176,0.00041503075,0.73420507],"study_design_scores_gemma":[0.00063319656,0.00043207366,0.07376455,0.004105935,0.00005046972,0.0012548806,0.0070556668,0.21215542,0.01787706,0.6811165,0.001065701,0.00048852834],"about_ca_topic_score_codex":0.000008770891,"about_ca_topic_score_gemma":0.000027992843,"teacher_disagreement_score":0.73371655,"about_ca_system_score_codex":0.0003335962,"about_ca_system_score_gemma":0.00030927252,"threshold_uncertainty_score":0.5009415},"labels":[],"label_agreement":null},{"id":"W4404333792","doi":"10.1115/detc2024-143598","title":"Elicitron: A Framework for Simulating Design Requirements Elicitation Using Large Language Model Agents","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Computer science; Requirements elicitation; Software engineering; Systems engineering; Programming language; Requirements analysis; Engineering; Software","score_opus":0.06904279386059138,"score_gpt":0.3412249124392414,"score_spread":0.27218211857865005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404333792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058221824,0.00022899621,0.939668,0.00001513612,0.00043382862,0.00023119968,0.000011462434,0.00047972793,0.0007098015],"genre_scores_gemma":[0.75107884,0.000003800075,0.24856326,0.00005678786,0.0001123244,0.00002638693,0.000011690811,0.000027507336,0.00011941159],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994004,0.000010383165,0.00017818189,0.00013016381,0.00010397851,0.00017692994],"domain_scores_gemma":[0.9997671,0.00007322647,0.000013314263,0.00008549195,0.000031537267,0.00002933384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012663599,0.00010228409,0.000076421806,0.00008640187,0.000070353715,0.000091365895,0.00004196409,0.0000874655,0.000077180084],"category_scores_gemma":[0.00003277605,0.00009850404,0.000050894505,0.00013765128,0.000005276451,0.00023477062,0.000006637918,0.00008972892,0.000014652079],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000619704,0.0000062044796,0.000014301541,0.00010097103,0.000047905138,8.9656584e-7,0.0014404238,0.90273607,0.017084174,0.053102784,0.0004056269,0.025054451],"study_design_scores_gemma":[0.000107975895,0.0000094661145,0.000003349724,0.00009978041,0.000022022004,0.000001269038,0.00037550603,0.98208296,0.0038996849,0.013109727,0.0001799277,0.00010831187],"about_ca_topic_score_codex":0.000004302172,"about_ca_topic_score_gemma":0.000002477638,"teacher_disagreement_score":0.692857,"about_ca_system_score_codex":0.00008683759,"about_ca_system_score_gemma":0.000015957992,"threshold_uncertainty_score":0.4016878},"labels":[],"label_agreement":null},{"id":"W4404384074","doi":"10.21275/sr22425235646","title":"A Case Study on Planning and Scheduling of a Project PIPLMC of a Package - 6A using Microsoft Project 2016","year":2022,"lang":"en","type":"article","venue":"International Journal of Science and Research (IJSR)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project planning; Project management; Computer science; Scheduling (production processes); Software engineering; Engineering management; Engineering; Systems engineering; Operations management","score_opus":0.1146416689681861,"score_gpt":0.4184759198305548,"score_spread":0.3038342508623687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404384074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9986925,0.00026696298,0.00043058634,0.00003934998,0.00026107702,0.00014846887,0.000011671461,0.0000041307067,0.00014521707],"genre_scores_gemma":[0.99923384,0.000027602864,0.00065090146,0.000005050342,0.000059977494,0.0000046604455,1.9484958e-7,0.0000049847113,0.00001279677],"study_design_codex":"bench_or_experimental","study_design_gemma":"qualitative","domain_scores_codex":[0.9982009,0.00007411572,0.00030344812,0.00011029018,0.0011754943,0.00013574667],"domain_scores_gemma":[0.99886304,0.000104071296,0.00011827626,0.00005888521,0.00081594085,0.00003976791],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023129932,0.000059138758,0.00011474632,0.0011440027,0.00022719937,0.00008006042,0.00023482092,0.000016335965,0.000006627115],"category_scores_gemma":[0.00019757454,0.00004640986,0.000025661648,0.0005466129,0.00043506114,0.0003184998,0.00012226003,0.0003545027,9.205232e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00049730745,0.00046307142,0.032463945,0.00010355599,0.00026018004,0.002013384,0.035221454,0.0099302,0.8898334,0.00058395724,0.000257453,0.028372131],"study_design_scores_gemma":[0.0065753167,0.006111607,0.011963194,0.0019698208,0.000081820406,0.06212935,0.5747726,0.19095278,0.14243303,0.0010897187,0.0012300259,0.0006907445],"about_ca_topic_score_codex":0.00017113089,"about_ca_topic_score_gemma":0.000003041291,"teacher_disagreement_score":0.74740034,"about_ca_system_score_codex":0.00012167259,"about_ca_system_score_gemma":0.00048732373,"threshold_uncertainty_score":0.18925393},"labels":[],"label_agreement":null},{"id":"W4404512570","doi":"10.1111/mice.13365","title":"Reinforcement learning‐based approach for urban road project scheduling considering alternative closure types","year":2024,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Office of Naval Research; Stanford Bio-X","keywords":"Reinforcement; Reinforcement learning; Computer science; Scheduling (production processes); Closure (psychology); Engineering; Artificial intelligence; Operations management; Structural engineering; Economics","score_opus":0.008398849816529172,"score_gpt":0.20520311828917964,"score_spread":0.19680426847265048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404512570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022537973,0.0017029952,0.97251135,0.000012572323,0.0013165064,0.00034376883,0.0000074298023,0.0009359847,0.0006314276],"genre_scores_gemma":[0.93115306,0.000048456666,0.0676955,0.00002366845,0.00083763606,0.000085812084,0.0000591546,0.00006360003,0.00003311622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989087,0.000012342191,0.0003049748,0.00033091783,0.00013915462,0.000303888],"domain_scores_gemma":[0.9996264,0.00007752296,0.000031527314,0.00012969866,0.000059604612,0.00007525563],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010744196,0.00032475672,0.00025866023,0.00027683165,0.000099908764,0.0002481196,0.000103309154,0.00014299196,0.000015045469],"category_scores_gemma":[0.000024397641,0.00030601464,0.00010223154,0.0002287507,0.000031853837,0.00025275524,0.000033036045,0.00043975277,0.0000014070732],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006363879,0.0000021473622,0.000075954755,0.00063297676,0.000131991,0.0000025976856,0.00042884523,0.97784877,0.0011488773,0.0033436192,0.000375493,0.01600238],"study_design_scores_gemma":[0.00033000554,0.00007858008,0.00013064471,0.00022997368,0.00003668711,0.00003801152,0.000051932657,0.986064,0.0017347152,0.0001245353,0.010847918,0.00033300015],"about_ca_topic_score_codex":0.000005711609,"about_ca_topic_score_gemma":9.555702e-7,"teacher_disagreement_score":0.9086151,"about_ca_system_score_codex":0.00008594074,"about_ca_system_score_gemma":0.000043512307,"threshold_uncertainty_score":0.9999392},"labels":[],"label_agreement":null},{"id":"W4404645866","doi":"10.1080/01446193.2024.2431280","title":"Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of New Brunswick","funders":"Mitacs","keywords":"Productivity; Estimation; Engineering; Construction industry; Construction engineering; Computer science; Industrial engineering; Architectural engineering; Business; Civil engineering; Economics; Systems engineering; Economic growth","score_opus":0.03252959761123006,"score_gpt":0.24141016539348428,"score_spread":0.20888056778225422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404645866","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55539215,0.0005985564,0.44123593,0.000056757453,0.0005391422,0.0002952569,0.000029360619,0.00023701153,0.0016158506],"genre_scores_gemma":[0.7143173,0.0013733635,0.28401768,0.000004499836,0.000037710077,0.000034902834,0.00015469898,0.000016505805,0.00004328355],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991991,0.000006883675,0.00032830553,0.0003202217,0.00005112273,0.00009438021],"domain_scores_gemma":[0.99969625,0.000011665164,0.0000614843,0.00017228247,0.000032687964,0.00002563202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001142432,0.0001328371,0.0001262791,0.00015169175,0.000093680865,0.00011830654,0.0000640304,0.000053664822,0.0000097297],"category_scores_gemma":[0.0000055412766,0.00014353458,0.000010227883,0.00016741027,0.0001356254,0.0011816527,0.000058834357,0.000064447995,0.0000029642626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015646849,0.000009113352,0.0004160253,0.0014826239,0.0001833762,2.1104557e-7,0.0006483729,0.014315368,0.00026696696,0.08171331,0.00009879051,0.9008502],"study_design_scores_gemma":[0.00025542424,0.000008063544,0.0003723956,0.00010105499,0.00009917996,0.00004697904,0.0010163025,0.9742745,0.0034544645,0.016590472,0.003568569,0.00021256231],"about_ca_topic_score_codex":0.0000022643426,"about_ca_topic_score_gemma":0.00001465922,"teacher_disagreement_score":0.95995915,"about_ca_system_score_codex":0.000056914276,"about_ca_system_score_gemma":0.000042578547,"threshold_uncertainty_score":0.585317},"labels":[],"label_agreement":null},{"id":"W4404647673","doi":"10.5109/7323308","title":"Scan to BIM for Building Asset Management","year":2024,"lang":"en","type":"article","venue":"Proceedings of International Exchange and Innovation Conference on Engineering & Sciences (IEICES)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Advanced Micro Devices (Canada)","funders":"Universiti Tun Hussein Onn Malaysia","keywords":"Asset management; Facility management; Business; Asset (computer security); Construction engineering; Engineering; Computer science; Finance; Marketing; Computer security","score_opus":0.02675941931741522,"score_gpt":0.2780022829575381,"score_spread":0.2512428636401229,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404647673","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70671064,0.00038665964,0.21618952,0.0030052522,0.0046275463,0.0008123538,0.00009364785,0.0007528664,0.067421496],"genre_scores_gemma":[0.98666817,0.00014638653,0.012574572,0.00007274095,0.00019167454,0.00012288704,0.000007906641,0.000012996513,0.0002026808],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991135,5.9849486e-7,0.00025327865,0.00023340533,0.00025463145,0.00014456392],"domain_scores_gemma":[0.9995607,0.00002409214,0.000036119825,0.000028977092,0.00031743894,0.000032641285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027813544,0.00012742542,0.00009748661,0.0011757732,0.000050098202,0.00028062225,0.00019073347,0.00004230069,0.000042594456],"category_scores_gemma":[0.000033237873,0.00012137324,0.000022600743,0.0011243728,0.000033975106,0.0005055776,0.000027889539,0.00007935026,0.0000038662797],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050351828,0.000004924498,0.00008435212,0.0002581382,0.000028974046,1.4339192e-7,0.00012473563,0.0010171606,0.024096673,0.922085,0.00091914675,0.051375713],"study_design_scores_gemma":[0.00028773388,0.00024252829,0.0013479914,0.0012151654,0.000020627904,0.000014416379,0.0006060412,0.85376453,0.03621187,0.00764097,0.09820067,0.0004474277],"about_ca_topic_score_codex":0.000002682525,"about_ca_topic_score_gemma":7.9444004e-7,"teacher_disagreement_score":0.914444,"about_ca_system_score_codex":0.000053107226,"about_ca_system_score_gemma":0.000011850456,"threshold_uncertainty_score":0.4949457},"labels":[],"label_agreement":null},{"id":"W4404741823","doi":"10.1061/jcemd4.coeng-15470","title":"Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Component (thermodynamics); Prefabrication; Production (economics); Architectural engineering; Computer science; Construction engineering; Engineering; Structural engineering","score_opus":0.00527542911631025,"score_gpt":0.18407553737239837,"score_spread":0.17880010825608814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404741823","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6534203,0.0018506772,0.34300888,0.00022084819,0.001164112,0.00018132776,0.0000011134478,0.000049965598,0.00010276515],"genre_scores_gemma":[0.9870536,0.0024338306,0.010404875,0.0000027076271,0.00006436448,0.000007162679,0.0000013844663,0.000010066852,0.000022041982],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993197,0.00001561833,0.0003931935,0.000072575385,0.00013408357,0.00006485918],"domain_scores_gemma":[0.9996512,0.000029349883,0.00011563232,0.000075549746,0.00011367102,0.000014607351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024057558,0.00009214078,0.0001174976,0.00013334518,0.000043532877,0.00003739013,0.00005176153,0.000032834214,0.0000045331326],"category_scores_gemma":[0.000013331544,0.000058231322,0.000030560703,0.00027936985,0.000071595605,0.00026641603,0.000012724313,0.0001466234,1.2439105e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001951194,0.0000060252323,0.00007578977,0.0004150274,0.0002020518,3.2771467e-7,0.00068378326,0.9314509,0.011146685,0.0040462017,0.00007688881,0.0518768],"study_design_scores_gemma":[0.00022266916,0.00008727551,0.0020756428,0.0015679997,0.00025574755,0.00045019737,0.0016186828,0.9592863,0.028432263,0.00005940927,0.005801689,0.00014214558],"about_ca_topic_score_codex":0.0000045144925,"about_ca_topic_score_gemma":7.9971e-7,"teacher_disagreement_score":0.33363324,"about_ca_system_score_codex":0.00003404934,"about_ca_system_score_gemma":0.000009214934,"threshold_uncertainty_score":0.23746043},"labels":[],"label_agreement":null},{"id":"W4404832897","doi":"10.1177/10591478241305339","title":"Learning to Balance the Performance and Deterioration of Aging Systems Through Derating","year":2024,"lang":"en","type":"article","venue":"Production and Operations Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Derating; Balance (ability); Computer science; Operations management; Economics; Business; Physical medicine and rehabilitation; Medicine; Engineering","score_opus":0.007426865914368767,"score_gpt":0.21358605453188936,"score_spread":0.20615918861752058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404832897","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9383338,0.002216495,0.053843006,0.0011413624,0.0013555988,0.00047540665,9.282351e-7,0.00022088777,0.0024125092],"genre_scores_gemma":[0.99668694,0.0008704178,0.0014596226,0.000016906495,0.000106067215,0.000076225275,0.0000024814724,0.000007039383,0.0007742819],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960643,0.000016610786,0.00013547794,0.00012117305,0.00006388382,0.000056415734],"domain_scores_gemma":[0.99988014,0.00000521746,0.0000074721656,0.00006525631,0.000030838677,0.000011079902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013193702,0.000059097594,0.00004795745,0.000055519296,0.00020762159,0.00020569604,0.000020404172,0.000012843293,0.000004847171],"category_scores_gemma":[0.0000067857122,0.0000455709,0.0000068897775,0.00016437753,0.000019145114,0.0003078561,0.000013726166,0.00006632718,0.00000378666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000023964787,0.000005579359,0.00082768936,0.00095485034,0.000069981186,4.6688567e-7,0.006244735,0.7501788,0.011311571,0.037156954,0.000621324,0.19262567],"study_design_scores_gemma":[0.000050882794,0.000040041115,0.002145411,0.00032129645,0.000033159264,0.000030048692,0.00404427,0.9705617,0.0039351494,0.00003303002,0.018675169,0.00012987267],"about_ca_topic_score_codex":0.000009075985,"about_ca_topic_score_gemma":0.000010821025,"teacher_disagreement_score":0.22038288,"about_ca_system_score_codex":0.00001733281,"about_ca_system_score_gemma":0.0000029091373,"threshold_uncertainty_score":0.19835316},"labels":[],"label_agreement":null},{"id":"W4404911138","doi":"10.2139/ssrn.5041538","title":"Automated 4d Clash Resolution and Scenario Planning for Complex Construction Workspaces","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Resolution (logic); Computer science; Process management; Business; Systems engineering; Engineering; Artificial intelligence; Robot","score_opus":0.014547181064534419,"score_gpt":0.2533197998998998,"score_spread":0.23877261883536535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404911138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33694878,0.049459007,0.59789425,0.0011006604,0.007242581,0.0009601352,0.00006102936,0.0035452822,0.0027882531],"genre_scores_gemma":[0.99051857,0.0029106515,0.0052500432,0.000013515712,0.0009039922,0.00004476001,0.0000818168,0.000069648864,0.00020697733],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981731,0.00003655667,0.00037732153,0.00025819367,0.00015731555,0.0009975054],"domain_scores_gemma":[0.99956745,0.00003297039,0.0001244499,0.00011628339,0.000092863156,0.00006597558],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0005085992,0.00027491612,0.00026411095,0.000289777,0.0002609559,0.00042086153,0.00011355472,0.00038599153,0.000009721946],"category_scores_gemma":[0.000017699533,0.00027181723,0.000121297395,0.000119612516,0.00010040062,0.00009895432,0.00006484208,0.0033706536,0.0000047489493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017822172,0.000019595138,0.00062720646,0.0008113592,0.0017071358,0.000005585596,0.00097435695,0.22232997,0.0016990217,0.5392226,0.008908377,0.22351657],"study_design_scores_gemma":[0.00032034857,0.00006335395,0.00012875505,0.0003997868,0.00013933532,0.0010610933,0.0012680513,0.6652405,0.000055019613,0.32835293,0.0026777529,0.00029308264],"about_ca_topic_score_codex":0.000019507877,"about_ca_topic_score_gemma":0.00024227702,"teacher_disagreement_score":0.6535698,"about_ca_system_score_codex":0.0010933755,"about_ca_system_score_gemma":0.0008918224,"threshold_uncertainty_score":0.9999734},"labels":[],"label_agreement":null},{"id":"W4404998357","doi":"10.15376/biores.20.1.625-671","title":"Using prefabricated wood light-frame in multi-storey and non-residential construction projects: Motivations and barriers of professionals in Quebec","year":2024,"lang":"en","type":"article","venue":"BioResources","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Prefabrication; Economic shortage; Business; Viewpoints; Construction industry; Sampling frame; Productivity; Thematic analysis; Perception; Sample (material); Quality (philosophy); Frame (networking); Architectural engineering; Engineering; Marketing; Qualitative research; Civil engineering; Construction engineering; Psychology; Sociology; Population","score_opus":0.018341455213061006,"score_gpt":0.2578032059131962,"score_spread":0.2394617507001352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404998357","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9976072,0.0008451357,0.0009538543,0.000052971987,0.0002005965,0.00020636548,0.000012964814,0.00006442268,0.000056522236],"genre_scores_gemma":[0.9984926,0.000019472107,0.0013887894,0.0000035394949,0.000027120714,0.00001998862,0.0000040309637,0.000011675411,0.000032760247],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993922,0.000028748233,0.00024230217,0.0001508443,0.00007868426,0.000107186395],"domain_scores_gemma":[0.999826,0.000028660907,0.000029061024,0.00005759078,0.000023026034,0.00003562131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008475413,0.00009556023,0.00012041507,0.00029816033,0.00003678126,0.000050475606,0.000032924072,0.00010962391,0.000010622941],"category_scores_gemma":[0.0000347372,0.0000860526,0.000015881289,0.00034892414,0.00009137666,0.00020324317,0.000017668697,0.00012912086,4.7113357e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006956772,0.00007302757,0.52975696,0.0012909912,0.00014065317,0.0000130434555,0.052675333,0.0025553529,0.3849856,0.0019274141,0.00020527488,0.026306765],"study_design_scores_gemma":[0.0018616518,0.000056047676,0.5159264,0.0027011812,0.00005917729,0.00005621893,0.034207895,0.3696935,0.073462576,0.00027135914,0.0010548581,0.0006491403],"about_ca_topic_score_codex":0.0024742326,"about_ca_topic_score_gemma":0.0032403243,"teacher_disagreement_score":0.36713812,"about_ca_system_score_codex":0.00005213658,"about_ca_system_score_gemma":0.00004507516,"threshold_uncertainty_score":0.3740316},"labels":[],"label_agreement":null},{"id":"W4405076000","doi":"10.3390/infrastructures9120220","title":"Developing an Ontology for Concrete Surface Defects to Enhance Inspection, Diagnosis and Repair Information Modeling","year":2024,"lang":"en","type":"article","venue":"Infrastructures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Building information modeling; Computer science; Information model; Asset (computer security); Field (mathematics); Asset management; Systems engineering; Knowledge management; Risk analysis (engineering); Data science; Construction engineering; Software engineering; Engineering; Business; Operations management","score_opus":0.009852343939144172,"score_gpt":0.2606218963007215,"score_spread":0.25076955236157733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405076000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6017054,0.0003854889,0.39614153,0.00006233184,0.0006944247,0.00015489827,0.0000139354015,0.0006956813,0.00014636111],"genre_scores_gemma":[0.9592853,0.000069897,0.04028217,0.00015120284,0.00010112109,0.00007423243,0.000020258542,0.000012802474,0.0000030017543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999474,0.000009825374,0.0001973419,0.00012856226,0.000059351354,0.00013095928],"domain_scores_gemma":[0.9997414,0.000042212236,0.000012808788,0.00008100791,0.00007367728,0.000048922055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006269668,0.0001118075,0.00009853029,0.00010588023,0.00009241535,0.000113792594,0.000041259485,0.00009306342,0.0000113579545],"category_scores_gemma":[0.00004314109,0.00010919332,0.000028005097,0.00013244024,0.00001769724,0.00060858333,0.000009809895,0.00009242176,0.0000045603474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052436695,9.97601e-7,0.0032960114,0.00088500127,0.00015784916,0.0000017677487,0.0071123545,0.66468334,0.007934552,0.1361126,0.006231001,0.1735321],"study_design_scores_gemma":[0.000093570794,0.00006975,0.0015166694,0.00010273236,0.000022047308,0.00003500208,0.000378136,0.94617563,0.020870946,0.015859425,0.014586438,0.0002896682],"about_ca_topic_score_codex":0.000048097954,"about_ca_topic_score_gemma":0.0001257558,"teacher_disagreement_score":0.35757995,"about_ca_system_score_codex":0.000077371915,"about_ca_system_score_gemma":0.000030117093,"threshold_uncertainty_score":0.44527745},"labels":[],"label_agreement":null},{"id":"W4405098744","doi":"10.22215/etd/2024-16282","title":"Advanced Visualization of Discrete-Event Systems Specification in 3D Building Information Modeling using Autodesk Forge Platform","year":2024,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"DEVS; Building information modeling; Systems engineering; Discrete event simulation; Computer science; Information model; Efficient energy use; Energy performance; Engineering; Event (particle physics); Visualization; Architecture; Architectural engineering; Software engineering; Modeling and simulation; Simulation; Mechanical engineering","score_opus":0.014342433155362848,"score_gpt":0.27672069810880306,"score_spread":0.26237826495344024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405098744","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37811893,0.0006861011,0.6112499,0.0000016710521,0.0029341558,0.0005836762,0.00002207314,0.00030957742,0.0060938867],"genre_scores_gemma":[0.9953619,0.00020359448,0.002325475,0.000001600046,0.00008176979,0.00007477072,0.0017343591,0.000053830383,0.00016269475],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981861,0.000012071568,0.0011194348,0.00018109067,0.00031615276,0.0001851385],"domain_scores_gemma":[0.9993816,0.000014373123,0.00021300506,0.0001706656,0.00018587253,0.000034507848],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017242905,0.00027505658,0.00031528785,0.0008194906,0.00004570587,0.00012109326,0.00009806755,0.00034801514,0.00002358805],"category_scores_gemma":[0.000018293375,0.0002812748,0.000084972686,0.0005162675,0.0000073572332,0.0013396974,0.000007940918,0.00024081123,0.000010207626],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022584523,0.000005641983,0.0000160751,0.0014221462,0.000029734989,1.8888761e-7,0.0012060612,0.9368406,0.0063723,0.041018285,0.000011833711,0.013054537],"study_design_scores_gemma":[0.0001709684,0.0000119580245,0.000029802826,0.0011986246,0.000044158765,0.000003527126,0.0039561554,0.98944783,0.0040883753,0.0005374579,0.00023986527,0.00027129354],"about_ca_topic_score_codex":0.00017415095,"about_ca_topic_score_gemma":0.00017654385,"teacher_disagreement_score":0.617243,"about_ca_system_score_codex":0.00045704105,"about_ca_system_score_gemma":0.000068676374,"threshold_uncertainty_score":0.99996394},"labels":[],"label_agreement":null},{"id":"W4405266280","doi":"10.31219/osf.io/vgbh6","title":"Utilizing Foundation Models to Enhance Autonomous Robotic Systems in Dynamic and Unstructured Environments","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Robotics; Adaptability; Artificial intelligence; Foundation (evidence); Autonomy; Computer science; Benchmark (surveying); Robot; Generalization; Human–computer interaction; Management","score_opus":0.011230059683741741,"score_gpt":0.23182953879485205,"score_spread":0.2205994791111103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405266280","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34069127,0.002935907,0.63931775,0.00009247893,0.0058166003,0.0010362543,0.000014797286,0.0005351132,0.009559865],"genre_scores_gemma":[0.9962039,0.00015623523,0.002921726,0.000009752551,0.000037979822,0.0001209597,0.000038091715,0.00003639444,0.00047496715],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990203,0.000017464252,0.00033151417,0.00036077754,0.00011419349,0.0001557962],"domain_scores_gemma":[0.99969506,0.000009853308,0.000028567898,0.0002062142,0.0000075014977,0.000052802952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000066019114,0.00022688239,0.0002245735,0.00023624598,0.000021252516,0.00017267231,0.000083103245,0.00023085454,0.000022051407],"category_scores_gemma":[0.000002134234,0.00023336241,0.00003047287,0.00008642964,0.000017923598,0.00008739857,0.00012772188,0.00040655266,0.000044187364],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017703302,0.0000021022056,0.000007507235,0.00028192616,0.00002709134,0.0000015119117,0.0003206974,0.95360935,0.002219181,0.00822574,0.000013505262,0.0352896],"study_design_scores_gemma":[0.000038931124,0.0000053282065,0.00014431759,0.0002708886,0.00001862557,0.000011004658,0.00019236957,0.9816718,0.00028107374,0.017032249,0.000110829125,0.00022257066],"about_ca_topic_score_codex":0.00019178246,"about_ca_topic_score_gemma":0.00025176682,"teacher_disagreement_score":0.65551263,"about_ca_system_score_codex":0.0004330982,"about_ca_system_score_gemma":0.000024462573,"threshold_uncertainty_score":0.9516243},"labels":[],"label_agreement":null},{"id":"W4405327131","doi":"10.1007/978-3-031-61535-1_21","title":"Structural Performance of Novel Steel Connection for Indigenous Modular Houses","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Indigenous; Modular design; Connection (principal bundle); Computer science; Structural engineering; Engineering; Programming language; Biology; Ecology","score_opus":0.01016942097514847,"score_gpt":0.19429315492048282,"score_spread":0.18412373394533435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405327131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19817957,0.015622415,0.75604653,0.000030239822,0.011068512,0.001935535,0.00051970413,0.0019227635,0.014674724],"genre_scores_gemma":[0.9966406,0.0001647717,0.0018630658,0.000006242574,0.00041011773,0.000046794536,0.000059665155,0.0001694199,0.0006392881],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989739,0.0000010813284,0.00038963804,0.0002477723,0.00015298417,0.00023462113],"domain_scores_gemma":[0.99955684,0.000093339215,0.000056128396,0.0001975932,0.00006234062,0.00003373067],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000056133817,0.00038208856,0.00037901546,0.00042544297,0.000028255243,0.000029831663,0.00011764983,0.00047141142,0.00003706629],"category_scores_gemma":[0.000023577628,0.00039189187,0.00013862156,0.000089454974,0.000024839037,0.00009347378,0.000016440566,0.0005541805,0.000002937591],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011201043,0.000002043873,0.000017332517,0.0013547726,0.000105456274,0.0000012279422,0.0002652284,0.9766842,0.005707884,0.00580492,0.000004204405,0.010041505],"study_design_scores_gemma":[0.0003477506,0.000096132535,0.00009712237,0.0010182305,0.00008405767,0.000056910278,0.000003291922,0.9796475,0.011750984,0.002207025,0.004098318,0.0005926494],"about_ca_topic_score_codex":0.000008624922,"about_ca_topic_score_gemma":0.00020915832,"teacher_disagreement_score":0.7984611,"about_ca_system_score_codex":0.00019353817,"about_ca_system_score_gemma":0.000027782691,"threshold_uncertainty_score":0.9998533},"labels":[],"label_agreement":null},{"id":"W4405329716","doi":"10.1007/978-3-031-61535-1","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 12","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Engineering ethics; Library science; Engineering; Environmental ethics; Law; Computer science; Philosophy; Thermodynamics; Physics","score_opus":0.00569883840875154,"score_gpt":0.17677103569564137,"score_spread":0.17107219728688983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405329716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004411418,0.03453616,0.59651357,0.0024969757,0.047004513,0.009980026,0.0063771275,0.005622609,0.2930576],"genre_scores_gemma":[0.9721889,0.00015780164,0.0041826786,0.00008152302,0.0018543955,0.00038097883,0.0001285293,0.0004901249,0.020535097],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998329,0.0000017387737,0.00048754096,0.00037292286,0.00027250007,0.0005362846],"domain_scores_gemma":[0.9993194,0.00010084707,0.00006705632,0.00020793825,0.00018288165,0.00012187883],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016677521,0.00054328144,0.0004781608,0.00034581334,0.0000607036,0.00012541452,0.00039081607,0.0008600841,0.00009098425],"category_scores_gemma":[0.00012937211,0.0005086493,0.0004224685,0.00034524518,0.000049701364,0.0001426996,0.000048888985,0.0013612248,0.0000067646956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059712115,0.000008076962,0.00011715649,0.0065976237,0.0005693675,0.0000038160665,0.0034535956,0.9110935,0.0028198655,0.010707051,0.059677072,0.0049469443],"study_design_scores_gemma":[0.00024904148,0.00003209799,0.00011630427,0.0024192382,0.00015265934,0.00003536275,0.000025563902,0.6938876,0.0016111616,0.0023346373,0.29822662,0.0009097059],"about_ca_topic_score_codex":0.00062484667,"about_ca_topic_score_gemma":0.11478876,"teacher_disagreement_score":0.96777743,"about_ca_system_score_codex":0.0010105078,"about_ca_system_score_gemma":0.0004264179,"threshold_uncertainty_score":0.9997365},"labels":[],"label_agreement":null},{"id":"W4405431381","doi":"10.1016/j.autcon.2024.105937","title":"Sensor adoption in the construction industry: Barriers, opportunities, and strategies","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Engineering; Construction engineering; Business; Manufacturing engineering; Computer science; Engineering management","score_opus":0.018231657081341373,"score_gpt":0.23212504588696073,"score_spread":0.21389338880561937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405431381","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97425944,0.0008085381,0.010070629,0.0010039125,0.0024468617,0.00035852214,0.000021690917,0.000744156,0.010286237],"genre_scores_gemma":[0.997618,0.0005548504,0.0015204746,0.000033483404,0.000131553,0.000074716445,0.000031590032,0.000015598325,0.000019743205],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898094,0.00010682209,0.0003843194,0.00019284427,0.00017353207,0.00016153895],"domain_scores_gemma":[0.9996929,0.00007201251,0.00003777638,0.000122061225,0.00003503346,0.00004017928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003093756,0.00015968454,0.00012352168,0.00047841162,0.0000819832,0.00032964742,0.000056633777,0.00028785528,0.00011758459],"category_scores_gemma":[0.00002023255,0.00014321563,0.0000270771,0.0005481455,0.0001974638,0.0012995133,0.0000067178403,0.0005096261,0.000008315621],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008925159,0.0000051764205,0.004864858,0.00022270675,0.000024305165,0.000017902312,0.002027876,0.0039366856,0.00077156787,0.63479364,0.00040769027,0.35291865],"study_design_scores_gemma":[0.0013969769,0.00010857431,0.048445955,0.0011270277,0.000094760086,0.0045987195,0.20520309,0.63284117,0.00097065244,0.06543156,0.038642354,0.0011391805],"about_ca_topic_score_codex":0.000058871778,"about_ca_topic_score_gemma":0.000106577914,"teacher_disagreement_score":0.62890446,"about_ca_system_score_codex":0.00013790916,"about_ca_system_score_gemma":0.000106088395,"threshold_uncertainty_score":0.5840164},"labels":[],"label_agreement":null},{"id":"W4405495783","doi":"10.1007/978-3-031-61503-0_4","title":"Understanding Design Issue Management and Coordination Processes When Using Cloud-Based BIM","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Cloud computing; Systems engineering; Process management; Computer science; Engineering; Operating system","score_opus":0.03414662012955203,"score_gpt":0.21226919085818605,"score_spread":0.17812257072863402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405495783","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000016957641,0.0049698856,0.97865844,0.00006085667,0.0011300908,0.00032741835,0.0000090450485,0.00047537725,0.014351954],"genre_scores_gemma":[0.95155656,0.0006286604,0.042542372,0.00006617648,0.0010695116,0.00007850988,0.00006353959,0.0004916847,0.0035030036],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898905,0.0000043927157,0.00028213282,0.00031667305,0.0001848814,0.00022287598],"domain_scores_gemma":[0.99960196,0.00013584888,0.0000361762,0.00014825135,0.00003200791,0.000045732042],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010175355,0.00039143537,0.00027293255,0.00064835657,0.000041378964,0.0001267365,0.000084663414,0.00034828845,0.00008900872],"category_scores_gemma":[0.000022355494,0.00043578117,0.000046135992,0.00015260547,0.00002658663,0.000100309946,0.000023071554,0.00048539953,0.000007563155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005163436,0.0000019556066,0.0000071395243,0.0024413916,0.00009994947,0.000024499668,0.00013527214,0.96993303,0.0001978863,0.024191167,0.000087640496,0.0028748987],"study_design_scores_gemma":[0.00022175166,0.00002121019,0.0000017880287,0.0025871624,0.00013704355,0.000025814457,0.000009717234,0.91822255,0.0009854742,0.065984696,0.011205499,0.00059732614],"about_ca_topic_score_codex":0.0000044070366,"about_ca_topic_score_gemma":0.000094271636,"teacher_disagreement_score":0.9515396,"about_ca_system_score_codex":0.00057080475,"about_ca_system_score_gemma":0.000027065209,"threshold_uncertainty_score":0.9998094},"labels":[],"label_agreement":null},{"id":"W4405495987","doi":"10.1007/978-3-031-61503-0_15","title":"Integrating Building Information Modeling (BIM), Universal Design (UD) Standards, and Age-In-Place Requirements at the Conceptual Design Stage of Houses","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Conceptual design; Systems engineering; Architectural engineering; Computer science; Engineering; Construction engineering; Engineering drawing; Software engineering; Mechanical engineering; Operations management","score_opus":0.019568001966087194,"score_gpt":0.2205850427103505,"score_spread":0.20101704074426333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405495987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012189896,0.0031442875,0.99135447,0.000016445274,0.0005203292,0.00041334005,0.0000640027,0.00020981819,0.0030583043],"genre_scores_gemma":[0.98465025,0.00064732134,0.013878662,0.000016488813,0.00010353286,0.000027367443,0.00003089841,0.00012601266,0.00051945617],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859875,0.000019853604,0.0005638589,0.00021958468,0.00034005113,0.00025788834],"domain_scores_gemma":[0.99926645,0.00034211608,0.00008869978,0.0001883165,0.000074300035,0.000040099814],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00043946234,0.00040997914,0.00037771734,0.0004700267,0.000049105376,0.00008598684,0.00014517133,0.0003456921,0.000056052988],"category_scores_gemma":[0.00013572088,0.00036177057,0.0000663102,0.00014310294,0.000069522,0.00034443344,0.00006404248,0.00081656245,0.0000018103343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023434513,9.76259e-7,0.000004444557,0.00027938478,0.00005728245,0.000010083358,0.0014576303,0.9753266,0.0013576013,0.017314997,0.000017193586,0.0041503776],"study_design_scores_gemma":[0.00031099966,0.0000407986,8.8824106e-7,0.0016264922,0.000041483523,0.000014378118,0.00013276108,0.98931605,0.0033100965,0.0025264113,0.0022941064,0.00038551426],"about_ca_topic_score_codex":0.000042510204,"about_ca_topic_score_gemma":0.0006910755,"teacher_disagreement_score":0.9834313,"about_ca_system_score_codex":0.0007337696,"about_ca_system_score_gemma":0.000073611605,"threshold_uncertainty_score":0.9998834},"labels":[],"label_agreement":null},{"id":"W4405496000","doi":"10.1007/978-3-031-61503-0_24","title":"Methods to Develop a Comprehensive Rule-Based Clash Avoidance System Based on Expert Opinion","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Expert opinion; Computer science; Rule-based system; Artificial intelligence; Medicine","score_opus":0.015724797161185144,"score_gpt":0.2529409520261787,"score_spread":0.2372161548649936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496000","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000011466693,0.0041404986,0.96054834,0.00016000793,0.005020554,0.00044103138,0.000041089377,0.0012934749,0.028343512],"genre_scores_gemma":[0.38448098,0.0002696668,0.6035282,0.0017691298,0.0040608416,0.0011535388,0.00048957526,0.0018462174,0.002401853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982409,0.000021970398,0.0005229641,0.00054683606,0.0002997182,0.00036763138],"domain_scores_gemma":[0.9987569,0.00049373007,0.00004912214,0.00043723188,0.00014007038,0.00012295906],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014483274,0.00071893464,0.00059728965,0.00085785607,0.000039357375,0.00008721982,0.00021728936,0.0006834329,0.00007349251],"category_scores_gemma":[0.00008454996,0.00074192154,0.00015191404,0.00035443463,0.000019945557,0.000046453326,0.00002990318,0.0011666663,0.00009697887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015570664,0.0000027422761,8.1895547e-7,0.0009366943,0.00004935904,0.000016853599,0.000113044705,0.9631441,0.0020288355,0.0072848992,0.00019995632,0.026207099],"study_design_scores_gemma":[0.00022783465,0.000038974777,0.000006255301,0.005166905,0.000015476184,0.00001506003,0.000003830541,0.79518914,0.0065626972,0.0003591012,0.19165498,0.0007597192],"about_ca_topic_score_codex":0.00000901668,"about_ca_topic_score_gemma":0.000061617524,"teacher_disagreement_score":0.38446954,"about_ca_system_score_codex":0.00088397076,"about_ca_system_score_gemma":0.00008980091,"threshold_uncertainty_score":0.9995032},"labels":[],"label_agreement":null},{"id":"W4405496053","doi":"10.1007/978-3-031-61503-0_16","title":"A BIM-Centric Decision-Making Supporting Tool for Material Selection During Early Design Stages of Building Envelope","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Envelope (radar); Selection (genetic algorithm); Building envelope; Architectural engineering; Engineering; Construction engineering; Computer science; Systems engineering; Process management; Artificial intelligence; Geography; Aerospace engineering","score_opus":0.006705616666849951,"score_gpt":0.2160106053733731,"score_spread":0.20930498870652314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496053","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021909295,0.00096256996,0.9730223,0.000005812554,0.0023551367,0.00063069136,0.00006269734,0.00056544086,0.00048608586],"genre_scores_gemma":[0.94512576,0.00009566487,0.05360021,0.0000031465327,0.00064563786,0.000078109624,0.000015164326,0.00025196405,0.00018433193],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979978,0.0000065954564,0.0008491738,0.00043175736,0.00026430583,0.0004503728],"domain_scores_gemma":[0.9990394,0.00048970256,0.0001466049,0.00019070673,0.00009044202,0.00004310816],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002475659,0.00053462555,0.0005458161,0.0010206004,0.00005735542,0.00013105507,0.00016965975,0.0005728092,0.00017120737],"category_scores_gemma":[0.00022902344,0.00057944824,0.00019497811,0.00025014803,0.000018339668,0.0001728395,0.000045050387,0.00063425663,0.000004124043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006234939,0.000003925298,0.00008119196,0.0015852854,0.00016516198,0.0000172407,0.00020461297,0.91178405,0.0456507,0.006186589,0.00000909494,0.034249783],"study_design_scores_gemma":[0.001295164,0.0002422949,0.0004888887,0.0155199375,0.0004703632,0.00029763515,0.000009760762,0.64970726,0.25785854,0.06788699,0.002964111,0.0032590253],"about_ca_topic_score_codex":0.0000044081808,"about_ca_topic_score_gemma":0.00003072168,"teacher_disagreement_score":0.92321646,"about_ca_system_score_codex":0.00040692792,"about_ca_system_score_gemma":0.000050266517,"threshold_uncertainty_score":0.9996657},"labels":[],"label_agreement":null},{"id":"W4405496074","doi":"10.1007/978-3-031-61503-0_34","title":"Comparative Analyses of Four BIM-Based Compliance Checking Tools","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Compliance (psychology); Computer science; Psychology; Social psychology","score_opus":0.07434731182979668,"score_gpt":0.28490797360839987,"score_spread":0.2105606617786032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496074","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00040660394,0.011013346,0.8923535,0.000044523524,0.0017356798,0.00033462583,0.00011287754,0.00068942225,0.09330944],"genre_scores_gemma":[0.994708,0.00007199348,0.004400715,0.00001542367,0.0002366471,0.000022775748,0.00005134349,0.00010644753,0.00038667477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880105,0.0000042444467,0.00047740672,0.00028114885,0.00021448599,0.00022166755],"domain_scores_gemma":[0.99930924,0.00024458283,0.00007212914,0.00026097056,0.000069149784,0.000043945864],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000063152555,0.00045021856,0.0006475377,0.0005261333,0.000017539673,0.000053601325,0.00016212053,0.0003669649,0.00018784618],"category_scores_gemma":[0.00003066062,0.0004584798,0.00019707205,0.00019777766,0.000042119587,0.00008181917,0.000020196696,0.00083382806,0.000023790151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004268037,0.0000024637698,0.000008217886,0.00073155464,0.00015488622,0.000012327638,0.00008731949,0.9782262,0.0066159526,0.009947959,0.00002449624,0.0041843527],"study_design_scores_gemma":[0.0002374061,0.00003275623,0.000060637045,0.0041360557,0.00013800904,0.000019016301,0.0000038377284,0.93358004,0.043891065,0.00799261,0.009135379,0.00077318423],"about_ca_topic_score_codex":0.000009219525,"about_ca_topic_score_gemma":0.00025108687,"teacher_disagreement_score":0.9943014,"about_ca_system_score_codex":0.00018312837,"about_ca_system_score_gemma":0.00003338705,"threshold_uncertainty_score":0.9997867},"labels":[],"label_agreement":null},{"id":"W4405496145","doi":"10.1007/978-3-031-61503-0","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 5","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering ethics; Engineering; Library science; Environmental ethics; Computer science; Physics; Philosophy; Thermodynamics","score_opus":0.005352233019658831,"score_gpt":0.17737056693712064,"score_spread":0.1720183339174618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496145","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053034737,0.040462673,0.6096583,0.002696255,0.04858764,0.010339724,0.006830689,0.0058357785,0.2702855],"genre_scores_gemma":[0.9752734,0.00014562123,0.0038585204,0.00007638682,0.0016939001,0.00035806824,0.000117862306,0.00045951045,0.018016778],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99839985,0.0000016165615,0.00046015083,0.00036042757,0.0002629021,0.0005150404],"domain_scores_gemma":[0.9993244,0.00009714549,0.000062359686,0.00019894223,0.00020110667,0.00011603966],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015640634,0.00052468816,0.00046413497,0.00034024243,0.000058085105,0.000120523335,0.00037796455,0.00083661155,0.00008627785],"category_scores_gemma":[0.00012253653,0.00048994407,0.0004137083,0.00040422974,0.0000482338,0.00013499039,0.00004637189,0.0013273249,0.0000070545557],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005240011,0.0000074889917,0.00009115047,0.0064496314,0.0005353711,0.000003604223,0.003149363,0.9136262,0.0027313526,0.011791315,0.056875683,0.0047336244],"study_design_scores_gemma":[0.00023588541,0.000029946385,0.00009695771,0.002389388,0.00014525604,0.000033748252,0.00002401508,0.7148672,0.0017029656,0.0025096075,0.2770878,0.0008772572],"about_ca_topic_score_codex":0.00058123685,"about_ca_topic_score_gemma":0.08932007,"teacher_disagreement_score":0.96996987,"about_ca_system_score_codex":0.0009903659,"about_ca_system_score_gemma":0.00042584023,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W4405505932","doi":"10.1016/j.autcon.2024.105933","title":"Egocentric-video-based construction quality supervision (EgoConQS): Application of automatic key activity queries","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China; Natural Science Foundation of Hunan Province; National Natural Science Foundation of China","keywords":"Key (lock); Quality (philosophy); Computer science; Human–computer interaction; Engineering drawing; Computer vision; Computer graphics (images); Engineering; Computer security","score_opus":0.009394161564362132,"score_gpt":0.25239538147606716,"score_spread":0.24300121991170504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405505932","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6783378,0.00029172556,0.31640345,0.00019800886,0.0015219586,0.0004737376,0.00003410032,0.0014301015,0.0013091144],"genre_scores_gemma":[0.9871903,0.000068131165,0.012356847,0.000011327994,0.00009419859,0.00015733723,0.00007975628,0.000034340454,0.000007733728],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979107,0.00017332495,0.00091894565,0.00037028323,0.0003923577,0.00023443424],"domain_scores_gemma":[0.9990231,0.00021963284,0.00017829532,0.0003426487,0.00017290606,0.00006342291],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004628313,0.0002735453,0.00034886075,0.0007509374,0.0000993456,0.00011598209,0.000116882045,0.00028711784,0.00018082869],"category_scores_gemma":[0.00007582614,0.00029363268,0.00012937942,0.0012161162,0.00024766827,0.0010218222,0.0000149465795,0.00030221624,0.000047131423],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024800134,0.000035081714,0.008437001,0.001019547,0.00004366289,0.0000011170571,0.0002508573,0.008310558,0.029757254,0.079382695,0.000091395166,0.87264603],"study_design_scores_gemma":[0.00054522045,0.000035297846,0.032469492,0.00029674725,0.00003927348,0.00006698053,0.00049927906,0.91376907,0.046664827,0.00412392,0.0011517406,0.00033814897],"about_ca_topic_score_codex":0.00021880431,"about_ca_topic_score_gemma":0.0001261313,"teacher_disagreement_score":0.9054585,"about_ca_system_score_codex":0.00042971066,"about_ca_system_score_gemma":0.00013560099,"threshold_uncertainty_score":0.9999516},"labels":[],"label_agreement":null},{"id":"W4405533087","doi":"10.3390/buildings14124021","title":"BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Formwork; Work (physics); Engineering; Construction engineering; Extraction (chemistry); Civil engineering; Computer science; Mechanical engineering","score_opus":0.016560256404014793,"score_gpt":0.2649086260695112,"score_spread":0.24834836966549642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405533087","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7446186,0.0009776244,0.25293756,0.000040438055,0.00056968053,0.00015098377,0.000008212642,0.0003048287,0.00039208095],"genre_scores_gemma":[0.9807074,0.000007987931,0.019108042,0.000014903002,0.00006433068,0.000034852306,0.000010167854,0.000017760836,0.0000345232],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995569,0.000003808955,0.00017183254,0.000097595526,0.00007218044,0.00009767483],"domain_scores_gemma":[0.9997957,0.0000732136,0.000026641837,0.000057373953,0.00002225957,0.00002481186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009645606,0.00007882249,0.00008970487,0.00009275969,0.00003702154,0.000054652137,0.000026883985,0.00005772639,0.00002011003],"category_scores_gemma":[0.000013529552,0.00007693438,0.000035888817,0.00015034084,0.000020072443,0.00018021383,0.0000038523453,0.00006260934,0.0000029583507],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015404458,0.000009089882,0.012544279,0.0044522686,0.00037411,0.000009402169,0.0024125709,0.012376698,0.4423239,0.044725128,0.021985235,0.45863327],"study_design_scores_gemma":[0.0008585712,0.00012505462,0.003289327,0.0025350282,0.0001452766,0.000022558106,0.00025974674,0.8761145,0.06643004,0.0025208248,0.047288653,0.0004104257],"about_ca_topic_score_codex":0.000003423717,"about_ca_topic_score_gemma":3.7302684e-7,"teacher_disagreement_score":0.8637378,"about_ca_system_score_codex":0.000034139255,"about_ca_system_score_gemma":0.000011129879,"threshold_uncertainty_score":0.3137293},"labels":[],"label_agreement":null},{"id":"W4405738502","doi":"10.1016/j.jobe.2024.111613","title":"Seismic properties, calculation method, and equivalent model of internal connection in modular steel building","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Natural Science Foundation of China","keywords":"Connection (principal bundle); Modular design; Structural engineering; Computer science; Engineering; Programming language","score_opus":0.017811585258465035,"score_gpt":0.24258660548369754,"score_spread":0.2247750202252325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405738502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47972065,0.0013168363,0.518467,0.000012190619,0.00041034087,0.00002943404,8.2655475e-7,0.00003341536,0.000009322633],"genre_scores_gemma":[0.9665336,0.000099482066,0.03321345,0.0000026982766,0.00011500272,0.0000025665202,2.251073e-7,0.000024798159,0.000008204957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991788,0.000012893861,0.00045400934,0.00008696374,0.00015186465,0.00011544961],"domain_scores_gemma":[0.9997644,0.00003281179,0.00005617798,0.000052420917,0.00005410275,0.000040083545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037690808,0.00011330865,0.00019184976,0.0004942499,0.0000119717215,0.00004623452,0.00005745725,0.00007018565,0.000002095942],"category_scores_gemma":[0.00003468277,0.000104131366,0.00006504926,0.00017530535,0.000008902496,0.00037976008,0.000014173246,0.0002951997,1.1741418e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004918959,0.0000021178216,0.00006137353,0.00016721556,0.000028743654,0.0000020780274,0.000118840355,0.6011783,0.3911025,0.0010183459,0.000006150208,0.0063094352],"study_design_scores_gemma":[0.00015433428,0.000022730599,0.00014279073,0.00088827306,0.000023076727,0.00016864671,0.00002823035,0.9247158,0.07334886,0.0002963653,0.000120323064,0.00009056268],"about_ca_topic_score_codex":0.000010754654,"about_ca_topic_score_gemma":9.272575e-7,"teacher_disagreement_score":0.48681292,"about_ca_system_score_codex":0.00017545893,"about_ca_system_score_gemma":0.000021667322,"threshold_uncertainty_score":0.42463538},"labels":[],"label_agreement":null},{"id":"W4405801857","doi":"10.1016/j.buildenv.2024.112503","title":"Decarbonising construction equipment: Management practices and strategies for net zero in UK infrastructure projects","year":2024,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan College","funders":"Northumbria University","keywords":"Zero emission; Zero (linguistics); Net (polyhedron); Business; Engineering; Waste management; Mathematics","score_opus":0.010246063324824754,"score_gpt":0.22756860703271709,"score_spread":0.21732254370789233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405801857","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9257854,0.0036732038,0.06775708,0.0001149527,0.00044761092,0.00033605797,0.0000052144824,0.00011387109,0.0017665694],"genre_scores_gemma":[0.9791826,0.0016944392,0.018965907,0.000009417334,0.000043662872,0.00006398186,0.0000042463635,0.000012553123,0.000023209217],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994766,0.000007945446,0.00013121942,0.00018856446,0.000068642796,0.00012702911],"domain_scores_gemma":[0.9998666,0.000023652456,0.000026454274,0.00005548544,0.0000013463085,0.000026475385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008653719,0.00011002426,0.000077925324,0.00010032969,0.000053941996,0.00019226306,0.00002253482,0.000055710025,0.000008590501],"category_scores_gemma":[0.0000020452453,0.000103749204,0.000013498904,0.000047397,0.00004622945,0.00019998322,0.000018189352,0.00008881727,5.691596e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031722564,0.000010752128,0.003315431,0.0011032472,0.00015202304,0.000013179375,0.0014996005,0.034536704,0.014814747,0.11315459,0.00041125095,0.83095676],"study_design_scores_gemma":[0.0025395332,0.00032760133,0.02933512,0.0015650289,0.0004020491,0.0005413882,0.018036105,0.53610575,0.008738028,0.20097855,0.19983952,0.0015913352],"about_ca_topic_score_codex":0.000010431422,"about_ca_topic_score_gemma":0.000003213889,"teacher_disagreement_score":0.82936543,"about_ca_system_score_codex":0.000067803376,"about_ca_system_score_gemma":0.0000060854263,"threshold_uncertainty_score":0.42307696},"labels":[],"label_agreement":null},{"id":"W4405857815","doi":"10.1007/978-3-031-70431-4_58","title":"An Investigation on the Benefits, Challenges and Solutions for BIM Adoption in the Indian Construction Industry","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"EllisDon (Canada)","funders":"","keywords":"Construction engineering; Business; Engineering; Risk analysis (engineering)","score_opus":0.02850634703813267,"score_gpt":0.20482740834356078,"score_spread":0.1763210613054281,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405857815","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27367273,0.27525014,0.24332017,0.04157235,0.031567484,0.0190037,0.0015852735,0.0071986998,0.10682947],"genre_scores_gemma":[0.9970043,0.0016463018,0.00037976546,0.00007599126,0.00052662374,0.00018971913,0.00006565975,0.00007772111,0.000033934],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991026,0.000013130561,0.00026226797,0.00025833995,0.00014342842,0.00022026102],"domain_scores_gemma":[0.9993816,0.00028466855,0.000038812293,0.00023313361,0.000026635946,0.000035159628],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002745799,0.00030089487,0.00017789687,0.00040642527,0.00007122006,0.00008202236,0.00012157691,0.0007799613,0.000013885141],"category_scores_gemma":[0.0000438088,0.00022573106,0.000051138504,0.000107382795,0.000060762624,0.00011685834,0.000011632272,0.0014551277,0.00000292274],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033156066,0.0000027270155,0.000010471421,0.00020001041,0.000026878177,0.000001661077,0.0014618568,0.28268915,0.00010947771,0.63857794,0.00001080345,0.07690572],"study_design_scores_gemma":[0.0008116722,0.00035051562,0.0028360283,0.005937532,0.00022186992,0.00034618584,0.0011346105,0.4216489,0.00093952776,0.54924977,0.01453445,0.0019889334],"about_ca_topic_score_codex":0.0000073699534,"about_ca_topic_score_gemma":0.0014098225,"teacher_disagreement_score":0.7233316,"about_ca_system_score_codex":0.00013557935,"about_ca_system_score_gemma":0.00002170678,"threshold_uncertainty_score":0.9205045},"labels":[],"label_agreement":null},{"id":"W4405920332","doi":"10.1504/ijplm.2024.143541","title":"Comparing IT tools used by a sample of BIM- and PLM-supported industries for design/engineering change management","year":2024,"lang":"en","type":"article","venue":"International Journal of Product Lifecycle Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Sample (material); Engineering; Manufacturing engineering; Operations management; Engineering management; Systems engineering; Chemistry","score_opus":0.06541142170030666,"score_gpt":0.2648728478926646,"score_spread":0.1994614261923579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405920332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10577878,0.0021673494,0.88281894,0.0025231994,0.004787569,0.0010365584,0.000086387445,0.00016149468,0.0006397171],"genre_scores_gemma":[0.9842125,0.00041402137,0.014720509,0.000034417866,0.00039560554,0.00006231771,0.000021036594,0.000025678202,0.00011388276],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989575,0.000011377455,0.0004537685,0.00013963354,0.00031047952,0.00012721124],"domain_scores_gemma":[0.9995914,0.00007163248,0.00009141682,0.00008634395,0.000116208124,0.000042985015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032916572,0.00013260626,0.00017037198,0.00038910226,0.000019782814,0.00015388022,0.00018922029,0.000030114237,0.000024293826],"category_scores_gemma":[0.000027422666,0.00012798379,0.000060291477,0.0001486028,0.000020985328,0.0005045302,0.000048596678,0.00011484116,0.0000015501943],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002716429,0.00019410794,0.0032778333,0.002682121,0.007351538,0.00010459903,0.0019073685,0.04516764,0.008156894,0.06993615,0.055589322,0.8053608],"study_design_scores_gemma":[0.0051096547,0.00050753186,0.013643734,0.0043378123,0.0011285257,0.000292944,0.0028388337,0.3183772,0.06275822,0.0058243563,0.58380276,0.001378416],"about_ca_topic_score_codex":0.000007628541,"about_ca_topic_score_gemma":0.0000015147534,"teacher_disagreement_score":0.87843376,"about_ca_system_score_codex":0.00009514382,"about_ca_system_score_gemma":0.0000082338765,"threshold_uncertainty_score":0.52190274},"labels":[],"label_agreement":null},{"id":"W4405931610","doi":"10.1007/978-3-031-61507-8","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 6","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Engineering ethics; Environmental ethics; Regional science; Engineering; Sociology; Law; Physics; Philosophy; Thermodynamics","score_opus":0.004742387975787928,"score_gpt":0.1758014728463465,"score_spread":0.17105908487055857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405931610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020807234,0.01187303,0.7232878,0.0013734133,0.019924318,0.006391061,0.0034908808,0.0023422358,0.22923653],"genre_scores_gemma":[0.95838636,0.00019100231,0.007135785,0.00015188623,0.0013952266,0.00049266854,0.0001759979,0.0003505107,0.031720582],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998456,0.0000020124805,0.00046870756,0.00033298702,0.00023546861,0.00050481496],"domain_scores_gemma":[0.99920666,0.00013079497,0.00007904702,0.00021788345,0.00026557944,0.00010004043],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014839214,0.00050267024,0.00049641216,0.00035213176,0.000074617325,0.00008149662,0.00042630004,0.0008573798,0.0000711122],"category_scores_gemma":[0.00019380233,0.0004898141,0.00037869738,0.0004184115,0.000045881305,0.0001295035,0.000046111494,0.0011200919,0.000001826733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006125595,0.000008304666,0.00019111959,0.004250605,0.00040325837,0.0000013330807,0.0016418822,0.9375394,0.0015977321,0.009638242,0.039421137,0.0053008324],"study_design_scores_gemma":[0.00046027426,0.000032118747,0.00028980966,0.0028297096,0.00015159442,0.000017506492,0.000026824855,0.7103948,0.002575119,0.001921239,0.28025895,0.0010420533],"about_ca_topic_score_codex":0.0007337654,"about_ca_topic_score_gemma":0.09993018,"teacher_disagreement_score":0.9563056,"about_ca_system_score_codex":0.0009694665,"about_ca_system_score_gemma":0.0005686452,"threshold_uncertainty_score":0.9997553},"labels":[],"label_agreement":null},{"id":"W4405931794","doi":"10.1007/978-3-031-61507-8_14","title":"Comparative Experimental Study of Three Concrete Workability Tests","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Materials science; Structural engineering; Engineering","score_opus":0.0161349193569992,"score_gpt":0.23884564556712826,"score_spread":0.22271072621012905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405931794","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21795383,0.032510176,0.33449405,0.000043505308,0.008632656,0.0055540414,0.00019787489,0.0024881172,0.39812577],"genre_scores_gemma":[0.99898255,0.0000115148005,0.00057467323,0.000004963709,0.00010261457,0.000050430364,0.000014190116,0.000043283635,0.00021577651],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99883705,0.0000081471735,0.00047846598,0.00029609253,0.00019485418,0.00018539437],"domain_scores_gemma":[0.9992526,0.0002506186,0.00006177806,0.0003414142,0.000055041088,0.00003851275],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00006993944,0.00041929138,0.00063216285,0.00028945098,0.000021454021,0.000019103332,0.00016387137,0.0003326379,0.00017913814],"category_scores_gemma":[0.000031968877,0.00044238128,0.000097564494,0.00012071506,0.000040682105,0.000059069003,0.000042435055,0.00071800454,0.000003677989],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050347506,0.00005829359,0.0012084206,0.0005635708,0.0006078115,0.000017909833,0.0042411825,0.97048646,0.00673764,0.007007019,0.00011406089,0.008907268],"study_design_scores_gemma":[0.005464131,0.0020984851,0.0045685736,0.0075585973,0.00065771426,0.00005598093,0.00044147333,0.8269708,0.1201565,0.012877244,0.012809117,0.0063413563],"about_ca_topic_score_codex":0.00002542046,"about_ca_topic_score_gemma":0.0013922628,"teacher_disagreement_score":0.78102875,"about_ca_system_score_codex":0.0002217431,"about_ca_system_score_gemma":0.000027415015,"threshold_uncertainty_score":0.99980277},"labels":[],"label_agreement":null},{"id":"W4405948438","doi":"10.3390/buildings15010103","title":"Integrating Design for Manufacturing and Assembly Principles in Modular Home Construction: A Comprehensive Framework for Enhanced Efficiency and Sustainability","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Modular design; Sustainability; Modular construction; Manufacturing engineering; Engineering; Systems engineering; Sustainable design; Architectural engineering; Computer science; Construction engineering","score_opus":0.01491373195635825,"score_gpt":0.25457524049521,"score_spread":0.23966150853885176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405948438","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47511387,0.0005515524,0.52355456,0.00005231163,0.00019925421,0.00040258767,0.0000040530645,0.000108582746,0.000013231359],"genre_scores_gemma":[0.8540567,0.00004449183,0.1456024,0.000008229967,0.000059758837,0.0002007618,0.000001978308,0.000018133383,0.000007553453],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992402,0.000013844042,0.00022404993,0.00026963823,0.00005754581,0.0001946738],"domain_scores_gemma":[0.99937123,0.00041615375,0.000023812452,0.00007740977,0.000078325225,0.000033043278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015855354,0.00014697005,0.00016947398,0.00013415408,0.00009205488,0.00014656475,0.000043645938,0.000117322365,0.00000226318],"category_scores_gemma":[0.00011401582,0.00014112175,0.00003781689,0.000108728316,0.000077684395,0.00018044599,0.000016425502,0.00016084287,1.5920392e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010040228,0.0000163205,0.00030344405,0.0032161933,0.000077682045,0.0000033256592,0.0037356548,0.035665624,0.033429462,0.6181031,0.00003253361,0.30531624],"study_design_scores_gemma":[0.0005792904,0.00015199358,0.00081430585,0.0006128715,0.00003851249,0.000063591855,0.0050180065,0.5998938,0.16848521,0.22101916,0.00287106,0.00045217067],"about_ca_topic_score_codex":0.0000075282023,"about_ca_topic_score_gemma":0.0000041725616,"teacher_disagreement_score":0.5642282,"about_ca_system_score_codex":0.00012282476,"about_ca_system_score_gemma":0.000032747983,"threshold_uncertainty_score":0.57547784},"labels":[],"label_agreement":null},{"id":"W4406098930","doi":"10.2139/ssrn.5071178","title":"Assessment of Technology Pathways for Net-Zero Concrete Production","year":2025,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Zero (linguistics); Net (polyhedron); Production (economics); Mathematics; Economics; Philosophy","score_opus":0.00457120915369818,"score_gpt":0.22637545784046445,"score_spread":0.22180424868676626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406098930","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2132131,0.002177049,0.778587,0.00060073956,0.0014342532,0.00023619551,0.0000030109172,0.00014322864,0.0036054128],"genre_scores_gemma":[0.99752015,0.00085089577,0.0011959185,0.0000072488792,0.00007819586,0.000026094873,0.0000024749966,0.000008406618,0.00031058982],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99916697,0.00000904394,0.0002096205,0.000080297374,0.00006109298,0.00047299743],"domain_scores_gemma":[0.9997238,0.000009806209,0.00005275733,0.000087273096,0.000114967894,0.0000113827955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032029295,0.00007239957,0.00011174425,0.00021226861,0.000068079484,0.000010645766,0.00008083185,0.0000828522,0.000004773843],"category_scores_gemma":[0.00002427281,0.00006819473,0.00005409963,0.00021880335,0.00003031578,0.0000742033,0.000005278586,0.00057281804,6.158311e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064283445,0.0000025232112,0.00049149286,0.000019838859,0.00010699096,5.587829e-8,0.000008792121,0.0007948661,0.03243358,0.87091726,0.00016578633,0.09505239],"study_design_scores_gemma":[0.0007047728,0.00026871846,0.00052024564,0.00006821544,0.00007013846,0.00017416288,0.0009864589,0.009862043,0.037042532,0.94319177,0.0069576846,0.0001532738],"about_ca_topic_score_codex":0.0000017075467,"about_ca_topic_score_gemma":0.000025338588,"teacher_disagreement_score":0.78430706,"about_ca_system_score_codex":0.00040767845,"about_ca_system_score_gemma":0.0006060183,"threshold_uncertainty_score":0.27809003},"labels":[],"label_agreement":null},{"id":"W4406211720","doi":"10.1016/j.pes.2025.100050","title":"The durability of innovative blocks through cyclic testing and actual climate exposure","year":2025,"lang":"en","type":"article","venue":"Progress in Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Durability; Environmental science; Materials science; Composite material","score_opus":0.008867596608893023,"score_gpt":0.24649967706557951,"score_spread":0.2376320804566865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406211720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9946522,0.0011904173,0.002645494,0.00004179289,0.0003646125,0.00011193231,0.0000016753761,0.00011053792,0.00088129716],"genre_scores_gemma":[0.99501127,0.000034651464,0.004903442,0.0000027946353,0.000010162738,0.000031866766,1.4002184e-7,0.0000037362852,0.0000019561448],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993453,0.0000052828273,0.00020786599,0.00013165182,0.00011353114,0.00019636241],"domain_scores_gemma":[0.99956304,0.00015638318,0.000024237705,0.00013144221,0.000111412184,0.000013487165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036898674,0.00007955819,0.000084576764,0.000092610055,0.00009561732,0.000051154275,0.00015832353,0.000031298554,6.130139e-7],"category_scores_gemma":[0.00031591792,0.0000612641,0.0000079850415,0.0015620844,0.00040788046,0.00020194422,0.00004847825,0.00014434237,1.3932556e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009457759,0.00002135481,0.53924143,0.00032827907,0.000016931881,0.0000011441648,0.0015551485,0.023796493,0.015541842,0.044512983,0.000006647003,0.3749683],"study_design_scores_gemma":[0.0003435096,0.00005101712,0.63936794,0.00044293897,0.0000059365634,0.0000125812685,0.0006185031,0.29380748,0.063230634,0.0016148224,0.0002383848,0.00026628538],"about_ca_topic_score_codex":0.0000023733141,"about_ca_topic_score_gemma":0.0000026202497,"teacher_disagreement_score":0.374702,"about_ca_system_score_codex":0.000042544554,"about_ca_system_score_gemma":0.00003082331,"threshold_uncertainty_score":0.24982776},"labels":[],"label_agreement":null},{"id":"W4406321664","doi":"10.1109/twc.2024.3525410","title":"Diffusion-Based Deep Reinforcement Learning for Resource Management in Connected Construction Equipment Networks: A Hierarchical Framework","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Wireless Communications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Beijing Jiaotong University","keywords":"Reinforcement learning; Computer science; Diffusion; Resource management (computing); Artificial intelligence; Computer network; Distributed computing","score_opus":0.010948539652178459,"score_gpt":0.2441993846879054,"score_spread":0.23325084503572693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406321664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029296959,0.0001371994,0.9912527,0.0008940516,0.00048694597,0.0008196894,0.000004854503,0.00041252768,0.0030623435],"genre_scores_gemma":[0.9808333,0.00051911746,0.016730765,0.00020962667,0.000016328655,0.0014426031,0.000069293565,0.000028343457,0.00015060593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99869466,0.00012625766,0.0005199227,0.00023346035,0.0001474955,0.00027820945],"domain_scores_gemma":[0.99841577,0.000602877,0.000059413294,0.00078851124,0.00007134834,0.00006206089],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015909802,0.00021468604,0.0002155158,0.00051055674,0.00054523046,0.00006469092,0.00037692094,0.00019727556,0.000046985253],"category_scores_gemma":[0.00000763345,0.00024376246,0.00012374476,0.00077373686,0.00016320177,0.000080857164,0.00000633728,0.0007716073,0.0000052529135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006850208,0.00009701848,0.00003315932,0.000046447043,0.000084622516,2.7190518e-7,0.000121069505,0.8085754,0.00011829147,0.0361323,0.000049562794,0.15467338],"study_design_scores_gemma":[0.0009818056,0.000045554643,0.000079694546,0.00035436932,0.00006322046,0.000001413922,0.00062235794,0.9892295,0.00071924634,0.0011079602,0.0065800976,0.00021478202],"about_ca_topic_score_codex":0.000015591622,"about_ca_topic_score_gemma":0.00015212281,"teacher_disagreement_score":0.9779036,"about_ca_system_score_codex":0.00033199796,"about_ca_system_score_gemma":0.000033690314,"threshold_uncertainty_score":0.99403447},"labels":[],"label_agreement":null},{"id":"W4406469549","doi":"10.3390/su17020673","title":"Developing an openBIM Information Delivery Specifications Framework for Operational Carbon Impact Assessment of Building Projects","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"National Research Council Canada","keywords":"Integrated project delivery; Business; Engineering; Computer science; Environmental resource management; Construction engineering; Systems engineering; Process management; Environmental science; Project management","score_opus":0.022169596546689777,"score_gpt":0.3352652333777578,"score_spread":0.31309563683106806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406469549","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42635536,0.000014065241,0.5722154,0.0001690067,0.00016196686,0.0005489612,0.000011707013,0.00006226054,0.0004613071],"genre_scores_gemma":[0.9299179,0.000004689472,0.069763176,0.000018026956,0.000030478766,0.00019909545,0.000055272918,0.0000047643125,0.0000066255266],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992919,0.00003001516,0.00033476824,0.000108662345,0.00009953434,0.0001351042],"domain_scores_gemma":[0.9986194,0.00008708028,0.000047874386,0.00020296493,0.0010166981,0.000025977317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002723907,0.00009787782,0.00012196245,0.00016414547,0.00010432118,0.00006813439,0.00009885051,0.00009180111,0.00001029858],"category_scores_gemma":[0.00026571567,0.00009567427,0.000050209062,0.00032481644,0.000037786347,0.0006001702,0.000016255857,0.00011371512,9.80138e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017209579,0.0000233158,0.018051367,0.00036961434,0.00003892081,3.637604e-8,0.00047628718,0.0312611,0.00034450032,0.92722976,0.00003782627,0.022150028],"study_design_scores_gemma":[0.00053825835,0.00011233242,0.27223918,0.00012107727,0.00004388661,0.0000019144054,0.005780887,0.44851902,0.009833441,0.26034883,0.0020784384,0.00038273865],"about_ca_topic_score_codex":0.00009303005,"about_ca_topic_score_gemma":0.000017031754,"teacher_disagreement_score":0.66688097,"about_ca_system_score_codex":0.0013912297,"about_ca_system_score_gemma":0.0010765212,"threshold_uncertainty_score":0.39014834},"labels":[],"label_agreement":null},{"id":"W4406500059","doi":"10.1109/dasa63652.2024.10836395","title":"Leveraging BIM for Decision Support and Logistics Optimization in Bahrain's Engineering Application","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Computer science; Decision support system; Systems engineering; Engineering; Artificial intelligence","score_opus":0.00912783951052959,"score_gpt":0.22092693942635666,"score_spread":0.21179909991582707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406500059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016161061,0.00022284572,0.99664754,0.000040918956,0.0003217473,0.00015302465,0.0000032754597,0.0002900434,0.0007045067],"genre_scores_gemma":[0.9286974,0.000083577426,0.071011014,0.000011708698,0.00005853698,0.00006353693,0.000023603074,0.00001724269,0.000033381722],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999623,0.0000015159749,0.0001378341,0.0001111726,0.000044315628,0.00008214989],"domain_scores_gemma":[0.9998254,0.000077863064,0.0000048473444,0.000052708605,0.000018329294,0.00002085196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008244246,0.00006779959,0.000056859182,0.00014592371,0.0000152215125,0.000060113936,0.000023375203,0.000053709206,0.000022066879],"category_scores_gemma":[0.000019684927,0.0000669168,0.000014375971,0.00014074543,0.0000060536945,0.00011936113,0.0000051577244,0.000056266064,0.0000035472851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000016136926,0.0000013330384,0.000059687707,0.00005582319,0.000003862482,3.865722e-7,0.000050419756,0.7893163,0.00048648752,0.025104007,0.00015417434,0.18476592],"study_design_scores_gemma":[0.00007469708,0.000006892524,0.000100699996,0.000032428095,0.000004783247,0.000007725268,0.000035821435,0.9923453,0.00038184863,0.000789862,0.0061427127,0.00007728384],"about_ca_topic_score_codex":0.0000041455446,"about_ca_topic_score_gemma":0.0000073989386,"teacher_disagreement_score":0.9270813,"about_ca_system_score_codex":0.0000464858,"about_ca_system_score_gemma":0.000007742802,"threshold_uncertainty_score":0.2728788},"labels":[],"label_agreement":null},{"id":"W4406568135","doi":"10.1016/b978-0-443-22282-5.00009-7","title":"Application of integrated MCDM methods in civil engineering","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Multiple-criteria decision analysis; Construction engineering; Civil engineering; Computer science; Systems engineering; Engineering; Operations research","score_opus":0.007810211435802939,"score_gpt":0.24043312317122176,"score_spread":0.23262291173541882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406568135","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000009212242,0.0011252034,0.05460706,0.000005370772,0.00047013813,0.00030033005,0.000025416002,0.00018392953,0.94327337],"genre_scores_gemma":[0.006022106,0.00022986258,0.031030953,0.000032368524,0.00015754899,0.00022352433,0.000113927694,0.00013128638,0.9620584],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99904186,0.000012918341,0.0005129767,0.00020085734,0.0001025582,0.00012882047],"domain_scores_gemma":[0.99946094,0.00005423795,0.00008050717,0.00029452756,0.00007724949,0.00003253695],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016889023,0.0002721577,0.000398011,0.00042835003,0.000010020031,0.000011675734,0.0001420608,0.00036156637,0.00008232019],"category_scores_gemma":[0.0000146440725,0.00028659226,0.000115765826,0.000051259296,0.0000322786,0.000029818902,0.000022023372,0.00047406403,0.000010182858],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000002442638,0.0000013990747,0.000005441728,0.00019715814,0.00004797814,5.786614e-7,0.000054427943,0.00049468136,0.0013803411,0.03205647,0.000032784443,0.9657263],"study_design_scores_gemma":[0.00013366796,0.000008679632,0.000019184194,0.00057561643,0.000047146983,0.0000039029296,0.000007898201,0.022755964,0.0024125143,0.004805714,0.9689558,0.00027389487],"about_ca_topic_score_codex":0.0000019871675,"about_ca_topic_score_gemma":0.00007830517,"teacher_disagreement_score":0.96892303,"about_ca_system_score_codex":0.00015306886,"about_ca_system_score_gemma":0.000052066844,"threshold_uncertainty_score":0.99995863},"labels":[],"label_agreement":null},{"id":"W4406611423","doi":"10.1109/wsc63780.2024.10838906","title":"A Federated Simulation-Based Framework for Enhanced Construction Project Planning and Control","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Control (management); Systems engineering; Engineering; Artificial intelligence","score_opus":0.01298878791146181,"score_gpt":0.2749704926771835,"score_spread":0.2619817047657217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406611423","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01953253,0.00027856638,0.97768223,0.00005105956,0.0006086923,0.00029899407,0.000011882998,0.0006827272,0.00085332536],"genre_scores_gemma":[0.9822752,0.0000016843858,0.017427431,0.000043675645,0.00010549008,0.00008818572,0.000012014418,0.000014903536,0.000031425072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961954,0.0000071711283,0.00012415394,0.000114937626,0.000045449142,0.000088721616],"domain_scores_gemma":[0.9995553,0.00034251186,0.000009253822,0.000031174073,0.00004310352,0.000018695431],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003937234,0.00008392376,0.000079210666,0.000085847096,0.00006976212,0.00015150188,0.000011829024,0.00009173594,0.000034012664],"category_scores_gemma":[0.000038912498,0.000074719246,0.000026552594,0.00011755786,0.000022319387,0.00010173671,9.402792e-7,0.00008762258,0.000002957532],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001288437,0.000008036074,0.00034892533,0.00045992332,0.00018568283,0.0000016417507,0.00041437952,0.66539675,0.026563752,0.08234626,0.00036518468,0.22378063],"study_design_scores_gemma":[0.0002639115,0.000023633316,0.00002620982,0.000091655544,0.000016545056,0.0000020461548,0.00014374114,0.981979,0.01339361,0.0028417853,0.0011229559,0.00009489417],"about_ca_topic_score_codex":0.0000029551134,"about_ca_topic_score_gemma":0.0000020701593,"teacher_disagreement_score":0.9627427,"about_ca_system_score_codex":0.000024379107,"about_ca_system_score_gemma":0.000029601228,"threshold_uncertainty_score":0.30469623},"labels":[],"label_agreement":null},{"id":"W4406612807","doi":"10.1109/wsc63780.2024.10838902","title":"How Do Different Minds Shape Performance in Construction? An Agent-Based Modelling Approach","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Artificial intelligence","score_opus":0.017879376204477056,"score_gpt":0.1976169306819519,"score_spread":0.17973755447747486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406612807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63057834,0.00017464597,0.36336884,0.000033615477,0.00049340306,0.00007447233,0.000002587347,0.0003119779,0.0049621146],"genre_scores_gemma":[0.9918387,0.000029058872,0.007786387,0.000008048603,0.00008472197,0.000037575977,0.000021472775,0.000018091618,0.00017593433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994359,0.000010157898,0.0001335995,0.00017449573,0.00010662935,0.00013923044],"domain_scores_gemma":[0.9998108,0.000008220779,0.0000070383003,0.00011355461,0.000016227117,0.00004414618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000040913168,0.00012590137,0.000094291965,0.00018137835,0.000031948144,0.00021444143,0.000059057213,0.0000789913,0.000116798146],"category_scores_gemma":[6.5223287e-7,0.00010511108,0.00003628472,0.00018517277,0.000029648525,0.00031174676,0.000004135075,0.00017662667,0.000008039075],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009831438,0.000034261862,0.0033401288,0.00030309238,0.000028436094,0.0000022939912,0.00030009396,0.5896309,0.00091710436,0.025385741,0.000069956215,0.37997815],"study_design_scores_gemma":[0.00011984072,0.000014652432,0.0002287378,0.000034680466,0.0000064762003,0.000012350479,0.00036158488,0.99614656,0.002170652,0.00012067928,0.00065076165,0.00013304436],"about_ca_topic_score_codex":0.0000036581823,"about_ca_topic_score_gemma":0.0000065073696,"teacher_disagreement_score":0.40651563,"about_ca_system_score_codex":0.00006687271,"about_ca_system_score_gemma":0.000013782082,"threshold_uncertainty_score":0.42863056},"labels":[],"label_agreement":null},{"id":"W4406697304","doi":"10.33593/iccp.v11i1.339","title":"Long Term Evaluation of Unbonded Concrete Overlay Technology: A Municipal Case Study","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Concrete Pavements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Waterloo","keywords":"Overlay; Term (time); Environmental science; Civil engineering; Forensic engineering; Computer science; Engineering; Geotechnical engineering; Physics","score_opus":0.039036285185506996,"score_gpt":0.30953787517993003,"score_spread":0.27050158999442303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406697304","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9737484,0.00003168621,0.000026478376,0.00018550525,0.00072437443,0.0006015659,0.000018360444,0.00006060966,0.024603004],"genre_scores_gemma":[0.9995425,0.000010922896,0.00006539411,0.000031175226,0.000019892665,0.00010770418,0.000003158173,0.000009414578,0.00020986679],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99862194,0.000013055198,0.0004471043,0.00019404787,0.00060470175,0.000119174685],"domain_scores_gemma":[0.9983418,0.00002394122,0.00021340516,0.00014403345,0.0012560576,0.000020736165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004278623,0.00015665837,0.00019185952,0.00030947558,0.000061032584,0.000045306235,0.0004865136,0.000090082285,0.00014341556],"category_scores_gemma":[0.000120948935,0.00013142375,0.000066098066,0.0003097461,0.00011384673,0.00015540775,0.00011322051,0.00019885697,0.0000023851696],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019969045,0.000050186278,0.27566126,0.00023327328,0.0020733622,0.000010281567,0.0026233227,0.00017978369,0.50184596,0.1888237,0.0005397518,0.027759433],"study_design_scores_gemma":[0.007349345,0.00051518076,0.015875055,0.001696114,0.0007673145,0.00014165448,0.024267316,0.21382017,0.7253348,0.009441951,0.00016917473,0.00062189694],"about_ca_topic_score_codex":0.000060759412,"about_ca_topic_score_gemma":0.00002204811,"teacher_disagreement_score":0.2597862,"about_ca_system_score_codex":0.00015545204,"about_ca_system_score_gemma":0.00007261775,"threshold_uncertainty_score":0.53593045},"labels":[],"label_agreement":null},{"id":"W4406705249","doi":"10.33593/iccp.v7i1.231","title":"USING FIBER-REINFORCED POLYMER LOAD TRANSFER","year":2001,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Concrete Pavements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"North Carolina State University","keywords":"Transfer (computing); Fiber; Materials science; Composite material; Computer science; Parallel computing","score_opus":0.03810906958843497,"score_gpt":0.25417941647280645,"score_spread":0.2160703468843715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406705249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8629355,0.000016278467,0.00036197546,0.00023656081,0.00067403755,0.00013260217,0.000014168912,0.00006204116,0.13556686],"genre_scores_gemma":[0.99533373,0.000030279003,0.00010625943,0.00011287902,0.00007819183,0.000012271549,0.0000023784185,0.000013397562,0.004310627],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99902934,0.0000020602404,0.00025872551,0.00012623469,0.0004504594,0.00013321069],"domain_scores_gemma":[0.9994718,0.000008153842,0.000051325227,0.000061756895,0.0003710348,0.00003597335],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000075994314,0.00013443214,0.00010870068,0.000068080975,0.000050377388,0.000065056534,0.00035832857,0.0000594594,0.0012400163],"category_scores_gemma":[0.000014033908,0.00010817138,0.00007774349,0.00010603415,0.000053772983,0.00021987343,0.000026979045,0.00013042203,0.000027481045],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065037915,0.00000280206,0.0015423379,0.000022566055,0.00015157655,3.1085872e-7,0.00021798347,0.00018153571,0.86569184,0.12869833,0.00038565087,0.003040041],"study_design_scores_gemma":[0.00077979703,0.000046788256,0.00030426815,0.00025564645,0.00003349765,0.000020628535,0.00030081059,0.0916642,0.90243983,0.000589576,0.0033141433,0.0002508083],"about_ca_topic_score_codex":0.000035289017,"about_ca_topic_score_gemma":0.0000015069571,"teacher_disagreement_score":0.13239825,"about_ca_system_score_codex":0.00012099367,"about_ca_system_score_gemma":0.00003412519,"threshold_uncertainty_score":0.999673},"labels":[],"label_agreement":null},{"id":"W4407040798","doi":"10.1108/ci-03-2024-0092","title":"Organizational competencies for BIM adoption: a cross-field analysis in the built asset industry","year":2025,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Business; Field (mathematics); Asset (computer security); Knowledge management; Industrial organization; Process management; Computer science; Mathematics","score_opus":0.014797644120468963,"score_gpt":0.2689009429311613,"score_spread":0.2541032988106923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407040798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55977154,0.00003941241,0.43297675,0.00091547513,0.0011901525,0.0002630446,0.000026557047,0.00015497646,0.004662096],"genre_scores_gemma":[0.9951769,0.0000071758454,0.0038770526,0.00039068976,0.00012866498,0.00010679148,0.00021941481,0.000007081729,0.00008623455],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99909997,0.000026212147,0.00045779927,0.0001558916,0.00014101055,0.000119103934],"domain_scores_gemma":[0.9991067,0.00011159868,0.00007759848,0.00016824443,0.0005267594,0.000009119416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025508305,0.00011475352,0.00013248724,0.00093664735,0.00016512068,0.00014219407,0.00011997572,0.00025916524,0.00014610526],"category_scores_gemma":[0.00015448737,0.00010430066,0.000047898957,0.006502461,0.000078424455,0.00024247833,0.000008903482,0.00030096126,0.00000344778],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011720722,0.0000108668055,0.1979487,0.000029737124,0.00011689188,1.4703286e-7,0.00006983951,0.005006052,0.0009790993,0.78461534,0.0009849921,0.010226608],"study_design_scores_gemma":[0.0026231667,0.00008821196,0.6710188,0.00012739292,0.0004994233,0.00007766377,0.0059540253,0.10662317,0.017818367,0.16385795,0.030461714,0.0008501244],"about_ca_topic_score_codex":0.000010661299,"about_ca_topic_score_gemma":0.000049827948,"teacher_disagreement_score":0.6207574,"about_ca_system_score_codex":0.00008858967,"about_ca_system_score_gemma":0.00007877013,"threshold_uncertainty_score":0.42532578},"labels":[],"label_agreement":null},{"id":"W4407080367","doi":"10.1007/s41062-025-01888-0","title":"Construction schedule planning to incorporate social distancing regulations during pandemics – a BIM-based approach","year":2025,"lang":"en","type":"article","venue":"Innovative Infrastructure Solutions","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Social distance; Pandemic; Schedule; Coronavirus disease 2019 (COVID-19); Environmental planning; Computer security; Environmental engineering science; Distancing; Computer science; Engineering; Internet privacy; Risk analysis (engineering); Business; Biogeosciences; Geography; Medicine; Infectious disease (medical specialty); Geology; Disease","score_opus":0.012036520127010205,"score_gpt":0.24025507851523523,"score_spread":0.22821855838822502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407080367","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27940193,0.000036651603,0.71196514,0.00022855178,0.0007399512,0.00026878592,0.000086338514,0.0004981261,0.00677454],"genre_scores_gemma":[0.9495942,6.975624e-7,0.04976344,0.00012043086,0.00019917803,0.00012077467,0.00012975543,0.000027187218,0.000044334116],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985745,0.000045021294,0.0005095185,0.00030991744,0.00018580668,0.00037522975],"domain_scores_gemma":[0.9990739,0.000033653807,0.00011184056,0.00020869757,0.0005113652,0.000060536913],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012490024,0.00027828958,0.00025109245,0.00074315985,0.0009165808,0.000103284445,0.00014940348,0.00024219767,0.000020808198],"category_scores_gemma":[0.00007373126,0.00030255178,0.00006541982,0.0036820148,0.00021449964,0.00028313702,0.00004774585,0.00054136704,0.000003985135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050116738,0.000021611086,0.013478035,0.00012993062,0.00017245629,0.0000013539752,0.0009980418,0.4181047,0.036964897,0.5179644,0.0019666562,0.010147803],"study_design_scores_gemma":[0.0042695254,0.00008189528,0.39106753,0.00075495016,0.000216865,0.00010924816,0.013025957,0.41094214,0.03414801,0.12775423,0.015033992,0.002595669],"about_ca_topic_score_codex":0.000006791008,"about_ca_topic_score_gemma":0.0000135245045,"teacher_disagreement_score":0.6701923,"about_ca_system_score_codex":0.0004946485,"about_ca_system_score_gemma":0.00020746337,"threshold_uncertainty_score":0.99994266},"labels":[],"label_agreement":null},{"id":"W4407094064","doi":"10.2139/ssrn.5123363","title":"Strutgen - Coordinate-Driven Implicit Modeling of Strut and Plate-Type Lattice Structures","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Lattice (music); Type (biology); Geometry; Computer science; Physics; Mathematics; Geology; Acoustics","score_opus":0.008411269739100849,"score_gpt":0.23345175671158847,"score_spread":0.22504048697248763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407094064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89848846,0.011512621,0.084300466,0.000072384355,0.0020072183,0.000277171,0.000067509165,0.0001637311,0.0031104267],"genre_scores_gemma":[0.99349886,0.0053491564,0.00074639806,0.0000078671765,0.00019057984,0.000004325958,0.000020571668,0.000029182147,0.00015308094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981762,0.00003999707,0.0004894662,0.00023173564,0.00018710451,0.0008754745],"domain_scores_gemma":[0.99934417,0.000027511081,0.00014915544,0.0002124026,0.00020267772,0.00006405927],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00025869178,0.0002957451,0.0003883943,0.00025769018,0.00010223747,0.00007823797,0.00024502884,0.00036964077,0.000026232901],"category_scores_gemma":[0.000020847387,0.0002868184,0.000108624234,0.0001319976,0.000038412647,0.00010852324,0.000110944675,0.0032141246,0.000001003685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007841847,0.000008839476,0.00077567296,0.0002838288,0.0011314418,0.0000015174834,0.00023229416,0.6987861,0.001231918,0.2500258,0.000046760535,0.047397453],"study_design_scores_gemma":[0.00043512735,0.0000944637,0.00012831508,0.0001764966,0.00021736567,0.00022149156,0.000698018,0.45834747,0.00048601997,0.5387548,0.00009460413,0.00034577365],"about_ca_topic_score_codex":0.00011551354,"about_ca_topic_score_gemma":0.00026139713,"teacher_disagreement_score":0.28872904,"about_ca_system_score_codex":0.00044529783,"about_ca_system_score_gemma":0.0010418039,"threshold_uncertainty_score":0.9999584},"labels":[],"label_agreement":null},{"id":"W4407175182","doi":"10.1139/cjce-2024-0154","title":"Assessing BIM adoption in the Canadian construction industry: a fuzzy Bayesian network approach","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Windsor","funders":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Bayesian network; Construction industry; Economic shortage; Key (lock); Fuzzy logic; Process management; Computer science; Engineering; Risk analysis (engineering); Construction engineering; Business; Operations management; Artificial intelligence; Computer security","score_opus":0.009388516436730434,"score_gpt":0.19722799293643076,"score_spread":0.18783947649970031,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407175182","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15996468,0.0059626964,0.5337221,0.0022202379,0.014075717,0.00073564355,0.000021405911,0.00018863946,0.2831089],"genre_scores_gemma":[0.99764156,0.000010673354,0.0018947524,0.00008328914,0.0003333649,0.0000067413225,0.0000041457533,0.000015754771,0.000009712816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999045,0.000033760898,0.00035898213,0.00008312064,0.00011447756,0.0003646718],"domain_scores_gemma":[0.99945366,0.00002932839,0.000051713883,0.000121099845,0.00008195117,0.00026225895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042419438,0.0001439915,0.00016834255,0.0008602171,0.00015134095,0.00030517945,0.0001884988,0.0002708133,0.000032590964],"category_scores_gemma":[0.000048595535,0.00013508889,0.000059756403,0.0009410043,0.000039613315,0.0003883531,0.000002196478,0.001017836,8.835427e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011735806,0.000001977056,0.010176392,0.000046715915,0.000046114033,0.000032043976,0.0002583216,0.93978,0.000028833192,0.03680244,0.0020365412,0.0107894465],"study_design_scores_gemma":[0.0017165352,0.000069977,0.18331935,0.0023441508,0.00022467038,0.0029718531,0.00819603,0.6763263,0.00011161278,0.009640753,0.11372976,0.001349036],"about_ca_topic_score_codex":0.02005282,"about_ca_topic_score_gemma":0.8648705,"teacher_disagreement_score":0.84481764,"about_ca_system_score_codex":0.0006917266,"about_ca_system_score_gemma":0.0010993723,"threshold_uncertainty_score":0.9864727},"labels":[],"label_agreement":null},{"id":"W4407272856","doi":"10.2139/ssrn.5122800","title":"Mp-Mcwt: Message Passing Strategy for Multi-Camera Worker Tracking in Construction","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Tracking (education); Computer science; Computer vision; Artificial intelligence; Psychology","score_opus":0.020580886519634137,"score_gpt":0.2766104539018321,"score_spread":0.25602956738219795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407272856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05771555,0.009434009,0.9262798,0.00016461013,0.003815613,0.0005693746,0.00003306027,0.00024386698,0.0017441319],"genre_scores_gemma":[0.9892887,0.00448806,0.0049035624,0.000017981587,0.00054806983,0.000092680224,0.000037813876,0.000052207273,0.00057093374],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99733454,0.0000736571,0.0006715155,0.0003178037,0.0001735486,0.0014289214],"domain_scores_gemma":[0.99936694,0.000047355043,0.00019996653,0.00018726777,0.00014286826,0.000055603407],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0007854321,0.00035691223,0.00039698783,0.0004606376,0.00016413843,0.00025692346,0.00023419566,0.0005032469,0.000026050619],"category_scores_gemma":[0.00003485929,0.00037526584,0.00024144632,0.00021648237,0.000054433352,0.000240092,0.00003432119,0.0050371587,0.0000025453608],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004675483,0.00003133066,0.0010650235,0.00013764338,0.00034489244,0.000002339043,0.00017215728,0.077655554,0.00033458348,0.06658798,0.000056540346,0.8535652],"study_design_scores_gemma":[0.00550414,0.0001843453,0.0026450069,0.0029280463,0.0004624986,0.0011614094,0.011230488,0.43111473,0.0022684664,0.5363972,0.004001061,0.002102575],"about_ca_topic_score_codex":0.00004928795,"about_ca_topic_score_gemma":0.0018517353,"teacher_disagreement_score":0.93157315,"about_ca_system_score_codex":0.0019785652,"about_ca_system_score_gemma":0.0018746638,"threshold_uncertainty_score":0.99986994},"labels":[],"label_agreement":null},{"id":"W4407275696","doi":"10.1007/978-981-16-7408-2_44-1","title":"Structural Analysis and Design Principles of Performance-Based Seismic Design (PBSD)","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Seismic analysis; Computer science; Engineering; Geology; Structural engineering","score_opus":0.02785354738688222,"score_gpt":0.1983828207230349,"score_spread":0.17052927333615267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407275696","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001591735,0.0010306679,0.7737525,0.000014473421,0.0003356903,0.00027857235,0.00002934615,0.00032801973,0.22263898],"genre_scores_gemma":[0.80577433,0.00032187256,0.018919643,0.000017798264,0.00009498791,0.000017460845,0.000052507978,0.00007716205,0.17472424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999238,0.000006919154,0.00031488208,0.00019116917,0.00014438623,0.00010464363],"domain_scores_gemma":[0.9996314,0.000046485075,0.00005254756,0.00017244791,0.00005488553,0.00004224618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000081075734,0.00025176068,0.0003240538,0.0004916314,0.000029935027,0.000038335853,0.00006446015,0.00022090737,0.00059887464],"category_scores_gemma":[0.0000017173084,0.0002081332,0.00013127574,0.000095588235,0.00007018095,0.00006436226,0.000011372122,0.000203378,0.000019217106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029590645,0.0000011848164,0.00009951485,0.0004636434,0.0016403863,0.0000030646872,0.000069779024,0.8570102,0.00025385138,0.10520281,0.00015505307,0.03507094],"study_design_scores_gemma":[0.00008798453,0.000042304433,0.00008660978,0.000090018795,0.0008632665,0.000006883357,0.000007457501,0.9884479,0.0041211043,0.0019708734,0.0040243543,0.00025122747],"about_ca_topic_score_codex":0.0000065139816,"about_ca_topic_score_gemma":0.0000100688585,"teacher_disagreement_score":0.8041826,"about_ca_system_score_codex":0.000050402497,"about_ca_system_score_gemma":0.000040518473,"threshold_uncertainty_score":0.8487426},"labels":[],"label_agreement":null},{"id":"W4407345698","doi":"10.5430/ijfr.v16n1p35","title":"Basic Stochastic Framework for Designing and Understanding Real Estate Models","year":2025,"lang":"en","type":"article","venue":"International Journal of Financial Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Real estate; Econometrics; Business; Economics; Finance","score_opus":0.10266400325212006,"score_gpt":0.3765987395876126,"score_spread":0.27393473633549253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407345698","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04110503,0.000109321794,0.9546502,0.00032982603,0.0010598671,0.00008110824,0.000006374837,0.000012322759,0.0026459286],"genre_scores_gemma":[0.99040645,0.0004917857,0.008759834,0.000014414264,0.0002600607,0.000008653333,9.508613e-7,0.0000077893155,0.00005003879],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99918914,0.00002539438,0.00023771674,0.0000689648,0.0003364088,0.00014238259],"domain_scores_gemma":[0.9988306,0.000499588,0.000039043225,0.00003923611,0.0005501697,0.000041339343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000604007,0.000057666224,0.00009506913,0.0004592433,0.000088351764,0.00010088875,0.00015778486,0.000071427945,0.0000066156704],"category_scores_gemma":[0.00044839154,0.000055876837,0.000043522723,0.00015359923,0.00006249617,0.00021760675,0.000020421614,0.0003543851,6.282936e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001963313,0.0000099959825,0.00007460226,0.000021901515,0.000057446716,0.000007981582,0.00040441364,0.020925486,0.0010210144,0.69386125,0.00077733153,0.28264228],"study_design_scores_gemma":[0.000643836,0.00010078758,0.00078731467,0.0005210622,0.00001252583,0.000034054938,0.0004184974,0.123706274,0.0011417465,0.8718584,0.00068122824,0.0000942369],"about_ca_topic_score_codex":0.000012301065,"about_ca_topic_score_gemma":0.000016599986,"teacher_disagreement_score":0.9493014,"about_ca_system_score_codex":0.00031000518,"about_ca_system_score_gemma":0.0001895961,"threshold_uncertainty_score":0.22785914},"labels":[],"label_agreement":null},{"id":"W44074408","doi":"10.22260/isarc2013/0065","title":"Fuzzy Clustering-Based Model for Productivity Forcasting","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cluster analysis; Computer science; Data mining; Fuzzy logic; Weighting; Artificial intelligence; Productivity; Genetic algorithm; Fuzzy clustering; Operations research; Industrial engineering; Machine learning; Engineering","score_opus":0.01613875031713675,"score_gpt":0.20342555860758593,"score_spread":0.1872868082904492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W44074408","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.898614,0.00005983011,0.07503895,0.0011995549,0.0006661821,0.0012788783,0.000012993702,0.00037313567,0.022756489],"genre_scores_gemma":[0.99266535,7.299028e-7,0.006706435,0.000025697822,0.000096306016,0.00016693106,5.350442e-7,0.000020474938,0.00031754945],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947584,8.7611534e-7,0.00015698207,0.00011603102,0.000100484525,0.00014978462],"domain_scores_gemma":[0.9996347,0.000014578328,0.00006033426,0.000066641805,0.00019944817,0.00002430473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009634921,0.000097347765,0.00010163038,0.000040294814,0.00007389583,0.00003629199,0.00014796466,0.000047474197,0.000006616807],"category_scores_gemma":[0.00006977722,0.0000737127,0.00007174357,0.000105556814,0.000041262756,0.00025165413,0.000024722307,0.000087242704,0.0000029973314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055834564,0.00006952455,0.0062642447,0.0021089301,0.00009096004,1.6462508e-8,0.0014131741,0.29090118,0.5950751,0.02191794,0.017883934,0.064219184],"study_design_scores_gemma":[0.00015691122,0.000012614086,0.0003014091,0.000045459077,0.000011791751,0.0000020999582,0.00008553116,0.9413319,0.0471489,0.010663251,0.00014983486,0.000090262816],"about_ca_topic_score_codex":0.000008333156,"about_ca_topic_score_gemma":0.000011195609,"teacher_disagreement_score":0.65043074,"about_ca_system_score_codex":0.000034325687,"about_ca_system_score_gemma":0.000010210529,"threshold_uncertainty_score":0.30059168},"labels":[],"label_agreement":null},{"id":"W4407577003","doi":"10.2139/ssrn.5135528","title":"Experimental Study on the Feasibility of Vr-Generated Synthetic Data for Automated Productivity Monitoring in Modular Construction","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Productivity; Computer science; Operating system; Economics","score_opus":0.04177875356451113,"score_gpt":0.30995589630459786,"score_spread":0.26817714274008675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407577003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9893047,0.0012099362,0.005682078,0.000055378063,0.0021066861,0.0012810013,0.00007681978,0.00017477361,0.00010860211],"genre_scores_gemma":[0.9992736,0.00012486355,0.00020504066,9.4599284e-7,0.00021557733,0.00011042745,0.000027660892,0.000020620188,0.000021290605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979602,0.00022502737,0.0005273432,0.00042501045,0.00023141663,0.000630972],"domain_scores_gemma":[0.9987733,0.00006197402,0.00017896127,0.000818191,0.00014342247,0.00002414538],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001816901,0.00025737577,0.0003340562,0.0001995405,0.000122083,0.00006366919,0.0005049328,0.00016217805,0.0000045586426],"category_scores_gemma":[0.0001414685,0.00020950212,0.00008348645,0.00021086347,0.000061639235,0.00014011413,0.00012709245,0.0020383087,4.6657087e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017448959,0.0057012225,0.046396192,0.0009437572,0.005915193,0.000006602615,0.0045009456,0.5326905,0.19092919,0.060154624,0.00021616304,0.1508007],"study_design_scores_gemma":[0.0032488327,0.0015840292,0.007835829,0.0011583294,0.00047623867,0.00023148963,0.035417296,0.6970492,0.19874504,0.05293099,0.000060141065,0.001262584],"about_ca_topic_score_codex":0.00006669697,"about_ca_topic_score_gemma":0.00013012071,"teacher_disagreement_score":0.16435869,"about_ca_system_score_codex":0.0014412281,"about_ca_system_score_gemma":0.00093045994,"threshold_uncertainty_score":0.885555},"labels":[],"label_agreement":null},{"id":"W4407657879","doi":"10.3390/app15042035","title":"A Conceptual Approach for the Knowledge-Based Computational Design of Prefabricated Façade Panels Using Constructability Features","year":2025,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Construction engineering; Architectural engineering; Computer science; Engineering; Structural engineering","score_opus":0.04761257561995846,"score_gpt":0.2726457464376044,"score_spread":0.22503317081764596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407657879","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02232506,0.00024361913,0.97349054,0.000021975162,0.00014351335,0.0004753446,0.00001016193,0.000064180735,0.003225592],"genre_scores_gemma":[0.92811257,6.843673e-7,0.07176673,0.000020183996,0.00001467704,0.000071346825,0.000003940238,0.0000027508202,0.0000071265563],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994366,0.000023593659,0.00017126337,0.00015056483,0.000106217114,0.00011175213],"domain_scores_gemma":[0.9992818,0.00051150424,0.000038647304,0.000078440265,0.00007493262,0.000014651886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028564344,0.00008133939,0.00010886598,0.00006652457,0.00021865866,0.00003471379,0.00017642956,0.000048279813,0.0000075235926],"category_scores_gemma":[0.000022197673,0.000056248875,0.00003241297,0.00045529925,0.0010330987,0.00004057466,0.000009491141,0.00006424226,3.124484e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012966799,0.000013336575,0.00015013482,0.000024531844,0.000019342353,5.098237e-9,0.00024138734,0.8469707,0.009775898,0.13623132,0.000096148244,0.006464252],"study_design_scores_gemma":[0.00025793927,0.000011709544,0.0009810177,0.000007872979,0.00002259129,0.000001041052,0.0014036413,0.97247034,0.019353969,0.0053463457,0.00007173234,0.0000718087],"about_ca_topic_score_codex":0.000005806405,"about_ca_topic_score_gemma":7.668521e-7,"teacher_disagreement_score":0.9057875,"about_ca_system_score_codex":0.000027287319,"about_ca_system_score_gemma":0.00018659203,"threshold_uncertainty_score":0.38064954},"labels":[],"label_agreement":null},{"id":"W4407871888","doi":"10.1016/j.autcon.2025.106066","title":"A data-driven and knowledge-based decision support system for optimized construction planning and control","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale pour le Développement de la Recherche en Santé; Agence Nationale de la Recherche; Université de Lorraine","keywords":"Decision support system; Computer science; Control (management); Engineering; Systems engineering; Construction engineering; Data mining; Operations research; Artificial intelligence","score_opus":0.012744519453692482,"score_gpt":0.26432564603905134,"score_spread":0.25158112658535886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407871888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12597612,0.0002783669,0.8695996,0.000069602975,0.0018395252,0.00061657367,0.000099719386,0.0005004965,0.0010200217],"genre_scores_gemma":[0.91233975,0.000017319178,0.08729424,0.000015879628,0.00005345228,0.00013174042,0.00012587922,0.000014197313,0.000007564217],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99887884,0.000051829422,0.0005065485,0.0003166479,0.00008998573,0.00015612887],"domain_scores_gemma":[0.9992237,0.000292783,0.000096082455,0.00022715189,0.00011603954,0.000044244232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029650805,0.00017267875,0.00026434753,0.0004963827,0.00015077119,0.000113731934,0.000082171195,0.00018384792,0.000009815075],"category_scores_gemma":[0.00007411431,0.000186021,0.000027424028,0.00028212543,0.00013642108,0.00045599038,0.000020875897,0.00012503203,0.0000021512142],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040502875,0.000025316678,0.020722635,0.0011203483,0.00014904368,0.0000020735922,0.00026954254,0.05919847,0.002481626,0.046784382,0.0009829083,0.86785865],"study_design_scores_gemma":[0.0039371015,0.000025247706,0.0044622165,0.00036825798,0.00006895171,0.000088326844,0.00072793086,0.98752314,0.00061515864,0.00081660657,0.0011984581,0.00016859836],"about_ca_topic_score_codex":0.0000065016375,"about_ca_topic_score_gemma":0.00001962447,"teacher_disagreement_score":0.9283247,"about_ca_system_score_codex":0.00014288351,"about_ca_system_score_gemma":0.00009948482,"threshold_uncertainty_score":0.7585716},"labels":[],"label_agreement":null},{"id":"W4407956844","doi":"10.1007/978-981-16-7408-2_47-1","title":"Performance-Based Seismic Design (PBSD) Practice in China","year":2025,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"China; Geology; Seismology; Geography; Archaeology","score_opus":0.008832645769134357,"score_gpt":0.19649601389661184,"score_spread":0.18766336812747747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407956844","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000023496983,0.0002402734,0.08805905,0.000118543874,0.00053215463,0.0001816139,0.0000035499745,0.00023727979,0.91060406],"genre_scores_gemma":[0.06514491,0.0010606267,0.012677167,0.0004998367,0.00018309474,0.000056903125,0.00005629159,0.000076950586,0.9202442],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993969,0.000009241409,0.00022928731,0.00014464464,0.00010867404,0.000111241316],"domain_scores_gemma":[0.99965614,0.00007630242,0.000036599955,0.00016888554,0.00003813921,0.000023905437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000094949326,0.00020169157,0.0001655901,0.00025729105,0.000025425163,0.00002616163,0.000079291545,0.00026805617,0.0006641566],"category_scores_gemma":[0.000013797616,0.00019675454,0.000047972186,0.000043387907,0.000018910301,0.00014341495,0.000006801496,0.00041349663,0.00013563981],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007882053,0.000015788217,0.0000232325,0.00037180656,0.00012539791,0.00001606648,0.00011104225,0.2840236,0.000037777223,0.12130119,0.03315004,0.56074524],"study_design_scores_gemma":[0.00028666848,0.000033865064,0.000033766122,0.00031421153,0.00004580325,0.000012684588,0.000011626131,0.56909007,0.0003942046,0.0010927651,0.4283593,0.0003250541],"about_ca_topic_score_codex":0.00001742638,"about_ca_topic_score_gemma":0.000011334439,"teacher_disagreement_score":0.56042016,"about_ca_system_score_codex":0.0001236793,"about_ca_system_score_gemma":0.000099676,"threshold_uncertainty_score":0.8023417},"labels":[],"label_agreement":null},{"id":"W4407983912","doi":"10.18280/ijsse.150116","title":"Design of Worker Rotation for a Precast Concrete Pole Factory Based on Mental Workload","year":2025,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Sumatera Utara","keywords":"Precast concrete; Factory (object-oriented programming); Workload; Engineering; Rotation (mathematics); Structural engineering; Computer science","score_opus":0.0070947580036629645,"score_gpt":0.21772827488164864,"score_spread":0.21063351687798568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407983912","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03562142,0.0005831311,0.96139425,0.00025768037,0.0016484219,0.00014217848,0.000029224786,0.000026826943,0.0002968773],"genre_scores_gemma":[0.99662125,0.00014393848,0.003101352,0.000028473483,0.000078298894,0.0000041207204,0.0000050955787,0.0000070109977,0.000010456272],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994249,0.000010321956,0.0003045331,0.000052844553,0.00014199482,0.00006543075],"domain_scores_gemma":[0.99957424,0.00013958303,0.00007096133,0.000034881734,0.0001535124,0.000026824962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014939361,0.00008317122,0.00012360896,0.00021151261,0.000019274206,0.000021516189,0.00008173665,0.000054124204,0.000014532819],"category_scores_gemma":[0.000037663354,0.00008204667,0.00006019231,0.00006355384,0.000015678623,0.0001318037,0.000005648755,0.00012514033,2.1583806e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000981976,0.000016512755,0.00023155204,0.0000926211,0.00034729147,0.0000025449046,0.00074987975,0.94017416,0.012214995,0.004520133,0.00024444106,0.040423866],"study_design_scores_gemma":[0.0011572478,0.00007538745,0.0007705038,0.00063740247,0.000021692324,0.000012134829,0.0001047414,0.98272336,0.011364417,0.00028418217,0.0027559162,0.00009301327],"about_ca_topic_score_codex":0.00000127646,"about_ca_topic_score_gemma":5.4439545e-7,"teacher_disagreement_score":0.96099985,"about_ca_system_score_codex":0.00008048397,"about_ca_system_score_gemma":0.00002724713,"threshold_uncertainty_score":0.3345766},"labels":[],"label_agreement":null},{"id":"W4407996454","doi":"10.1061/9780784486009.046","title":"Sustainable MSE Wall Design Using Multi-Objective Optimization","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor; University of Waterloo","funders":"","keywords":"Computer science; Multi-objective optimization; Mathematical optimization; Mathematics; Machine learning","score_opus":0.013341856194207153,"score_gpt":0.2299640176969597,"score_spread":0.21662216150275254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407996454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018121975,0.00007737193,0.98695076,0.000024984809,0.00018787148,0.00014670436,2.3987147e-7,0.00026232863,0.010537539],"genre_scores_gemma":[0.7046813,0.0000195007,0.28495264,0.00006921333,0.000022721497,0.0000228814,0.0000035791616,0.000014517394,0.010213643],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996647,0.000015473963,0.00009461232,0.00007782431,0.000034841243,0.00011252331],"domain_scores_gemma":[0.999791,0.000015462902,0.000008534909,0.000068766465,0.00010062725,0.000015606347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052118063,0.000066628956,0.0000567924,0.00011397565,0.000068119276,0.00003989372,0.00003351719,0.000056898596,0.000109839755],"category_scores_gemma":[0.000015778789,0.000064787666,0.000019175543,0.0002376754,0.000011835372,0.00017891676,0.0000070358756,0.000055482084,0.0000048209704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037561292,0.0000056362705,0.00008212515,0.000015658963,0.000017165316,6.6414987e-7,0.00007194296,0.98358995,0.00063329923,0.013794576,0.000278682,0.0015065423],"study_design_scores_gemma":[0.00017623793,0.0000043009627,0.000050979987,0.000009155386,0.000010727283,0.000001672206,0.0007428285,0.9892631,0.008909331,0.00034428074,0.0004194999,0.00006789783],"about_ca_topic_score_codex":0.00007972196,"about_ca_topic_score_gemma":0.000008428265,"teacher_disagreement_score":0.7028691,"about_ca_system_score_codex":0.00014545282,"about_ca_system_score_gemma":0.00003516242,"threshold_uncertainty_score":0.26419643},"labels":[],"label_agreement":null},{"id":"W4408093378","doi":"10.1016/j.rineng.2025.104550","title":"Uncovering key themes in modular construction waste management and exploring their impact and centrality","year":2025,"lang":"en","type":"article","venue":"Results in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Centrality; Key (lock); Modular design; Process management; Business; Knowledge management; Data science; Engineering; Computer science; Computer security","score_opus":0.00944785027446093,"score_gpt":0.20227941720822207,"score_spread":0.19283156693376113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408093378","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98977417,0.0010887318,0.0071291123,0.00001689875,0.000404613,0.00013317475,0.000008458185,0.00012197009,0.0013228483],"genre_scores_gemma":[0.9973596,0.0011858658,0.0013779328,0.0000021342162,0.000023136781,0.00002635603,0.0000033594608,0.000011181916,0.000010436019],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993122,0.000009250382,0.00025550454,0.00017218328,0.000055723795,0.00019509876],"domain_scores_gemma":[0.9997984,0.000031231353,0.0000139517,0.00011693529,0.000007916586,0.000031519612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011787938,0.00015132979,0.00014800765,0.00029788446,0.000020217632,0.000042053045,0.00004213576,0.00005304547,0.0000011310281],"category_scores_gemma":[0.000015736437,0.00014325336,0.000021575503,0.00028043686,0.00001778484,0.0002399028,0.00003067173,0.00016029837,2.1956265e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026236665,0.0000054874226,0.0068495963,0.00028185316,0.000047188973,0.0000054274724,0.0007035555,0.9118524,0.0024545758,0.0027424307,0.000004751325,0.07502648],"study_design_scores_gemma":[0.0022950121,0.000019491494,0.119197585,0.0012448459,0.00001682038,0.000024447798,0.0030650941,0.8557257,0.015409598,0.0015237766,0.001007406,0.0004702399],"about_ca_topic_score_codex":0.00003567476,"about_ca_topic_score_gemma":0.00002609135,"teacher_disagreement_score":0.11234799,"about_ca_system_score_codex":0.00014548775,"about_ca_system_score_gemma":0.0000042985544,"threshold_uncertainty_score":0.5841702},"labels":[],"label_agreement":null},{"id":"W4408106460","doi":"10.1007/978-3-031-82481-4_26","title":"Augmented Human-AI Forecasting for Ship Refit Project Scheduling: A Predict-then-Optimize Approach","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thales (Canada)","funders":"","keywords":"Computer science; Scheduling (production processes); Artificial intelligence; Operations research; Engineering; Operations management","score_opus":0.03552596327367583,"score_gpt":0.2562589204819664,"score_spread":0.2207329572082906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408106460","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00008747386,0.00025398305,0.9811348,0.00005716689,0.0012545323,0.00080858887,0.000021917534,0.00032104691,0.016060516],"genre_scores_gemma":[0.099520676,0.000018633387,0.89717275,0.00034724595,0.001105687,0.00021298818,0.00009924538,0.00008195246,0.0014408417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998101,0.000010359085,0.00044892458,0.00069541286,0.00034153907,0.00040275612],"domain_scores_gemma":[0.999074,0.00016100136,0.00010400257,0.00040964904,0.00019781753,0.00005352422],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0003752269,0.00040036175,0.00037265584,0.00067125494,0.0002389679,0.00024222846,0.0005700541,0.0003649349,0.000010756835],"category_scores_gemma":[0.00006766687,0.00037328032,0.00013026936,0.00033509822,0.0002528667,0.00019802338,0.00011843901,0.0007033288,0.0000014699241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002232526,0.000017358041,0.000036322446,0.00039818522,0.00006134168,0.0000033515225,0.0005597829,0.534375,0.0002033106,0.020994646,0.00015598228,0.44317237],"study_design_scores_gemma":[0.00032839717,0.00006691443,0.0000040025016,0.00054381497,0.000025556783,0.000022061507,0.0000010689871,0.98068684,0.0005590857,0.016273921,0.0011341142,0.00035420715],"about_ca_topic_score_codex":0.0000087061135,"about_ca_topic_score_gemma":0.00002118098,"teacher_disagreement_score":0.44631183,"about_ca_system_score_codex":0.00028578553,"about_ca_system_score_gemma":0.0002443226,"threshold_uncertainty_score":0.9998719},"labels":[],"label_agreement":null},{"id":"W4408398184","doi":"10.1007/978-3-031-84208-5_26","title":"Comparative Analysis of Two BIM Model Transfer Processes in Cave Automatic Virtual Environments","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Cave; Computer science; Human–computer interaction; Geology; Geography; Archaeology","score_opus":0.009548044969818599,"score_gpt":0.21471224436444195,"score_spread":0.20516419939462335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398184","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0051803533,0.0012387016,0.9815206,0.0000061649075,0.00018099457,0.0002580065,0.000090787675,0.00012708636,0.011397323],"genre_scores_gemma":[0.99805367,0.00015453037,0.0011127976,0.000009793978,0.000024296589,0.000040023635,0.000075952856,0.00003581516,0.00049314304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99878556,0.000006489034,0.0005392339,0.00026672025,0.00020424003,0.00019777987],"domain_scores_gemma":[0.9995226,0.00017810274,0.00003638606,0.000208,0.000022009992,0.000032869517],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00005742565,0.00039916945,0.0007912899,0.0013494154,0.000011909674,0.000014706111,0.00014112626,0.00031637657,0.00010641844],"category_scores_gemma":[0.000022345528,0.00042575065,0.00013920966,0.00046843264,0.000032938427,0.00008155926,0.000014460579,0.00055794267,0.000001992685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000032812934,0.000008262081,0.00004771732,0.000293528,0.0004913593,0.000002395497,0.00085323554,0.9894747,0.00068736804,0.005473712,0.0000018070559,0.0026626228],"study_design_scores_gemma":[0.00024582475,0.000012977128,0.00006407298,0.0005421104,0.00034898662,0.0000010489115,0.0000054974507,0.9943307,0.0029173135,0.0010718858,0.00012530996,0.00033425412],"about_ca_topic_score_codex":0.000016118236,"about_ca_topic_score_gemma":0.0025362505,"teacher_disagreement_score":0.9928733,"about_ca_system_score_codex":0.00023639541,"about_ca_system_score_gemma":0.000044583398,"threshold_uncertainty_score":0.99981946},"labels":[],"label_agreement":null},{"id":"W4408398227","doi":"10.1007/978-3-031-84208-5_34","title":"Using Change Orders to Measure the Impact of Building Information Modeling: A Case Study","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Measure (data warehouse); Computer science; Data mining","score_opus":0.033877567998228914,"score_gpt":0.2600188530319226,"score_spread":0.2261412850336937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398227","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02046845,0.00064084283,0.97485185,0.00001521296,0.0006251318,0.0010113333,0.000026790276,0.00019508958,0.0021652773],"genre_scores_gemma":[0.9984462,0.000013131414,0.0012800217,0.000013430541,0.00013837469,0.000045160283,0.0000060559746,0.000046288114,0.000011332568],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898076,0.00000831254,0.0004480409,0.00015065014,0.00019989503,0.00021232422],"domain_scores_gemma":[0.99940425,0.00007759565,0.000058931168,0.00029333416,0.00012162481,0.000044260538],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016303173,0.00037531674,0.00034861662,0.0007071742,0.000045876805,0.000049608738,0.00014511458,0.0002821322,0.000022695633],"category_scores_gemma":[0.00009438823,0.00030817842,0.00014299723,0.000262816,0.00000916004,0.00021158026,0.000039503833,0.000627457,9.2079637e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000056033737,0.0000034136924,0.000029992507,0.000108017884,0.00011909302,0.000015489086,0.0017856107,0.97910845,0.0001284737,0.00033021005,0.00000499932,0.018360619],"study_design_scores_gemma":[0.00017949931,0.000038830614,0.0000049470764,0.00053018314,0.00006048412,0.00014806088,0.000058405316,0.99829346,0.00005803139,0.00023094617,0.000112133836,0.0002849902],"about_ca_topic_score_codex":0.0009511789,"about_ca_topic_score_gemma":0.0012429521,"teacher_disagreement_score":0.97797775,"about_ca_system_score_codex":0.00037148426,"about_ca_system_score_gemma":0.00005270367,"threshold_uncertainty_score":0.99993706},"labels":[],"label_agreement":null},{"id":"W4408398295","doi":"10.1007/978-3-031-84208-5_33","title":"The IPD Contract Methodology as a Strategic Element in the Management of Building Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Element (criminal law); Business; Process management; Engineering management; Construction engineering; Engineering; Political science","score_opus":0.025043093512556798,"score_gpt":0.2557257334948404,"score_spread":0.2306826399822836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398295","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019252155,0.017007254,0.6596757,0.00047468406,0.0031147164,0.0024182415,0.000023283646,0.00034140545,0.31501946],"genre_scores_gemma":[0.9913466,0.0013808424,0.006356124,0.00005257898,0.00013410131,0.00016734892,0.000011289371,0.000056484594,0.00049465365],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998798,0.000034576682,0.0004751848,0.00021731367,0.00020114306,0.00027374394],"domain_scores_gemma":[0.99886745,0.00069235114,0.00007365341,0.0003219343,0.00002862477,0.00001599873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054938666,0.00032019173,0.00032843158,0.00027487945,0.000034894318,0.00004144976,0.00030737364,0.0002810492,0.00003595928],"category_scores_gemma":[0.00003734918,0.00022480669,0.00009971034,0.00016304168,0.000030830804,0.000033579294,0.00003331079,0.000837613,0.0000012965014],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014379506,0.00000569527,0.000008698875,0.0006050683,0.00024728934,0.000030536947,0.00035909817,0.33726385,0.0004996292,0.59682584,0.000015066131,0.06412486],"study_design_scores_gemma":[0.0025333476,0.00029030204,0.0003822432,0.009171684,0.0006493691,0.00020368792,0.0005550386,0.55835193,0.009584528,0.34579203,0.0700263,0.002459553],"about_ca_topic_score_codex":0.000034773973,"about_ca_topic_score_gemma":0.0008464788,"teacher_disagreement_score":0.98942137,"about_ca_system_score_codex":0.00015936681,"about_ca_system_score_gemma":0.000033472053,"threshold_uncertainty_score":0.91673505},"labels":[],"label_agreement":null},{"id":"W4408398303","doi":"10.1007/978-3-031-84208-5_61","title":"Planning the Evolution of the Sectors of a Construction Project Over Time with the Dynamic Location Breakdown Structure","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Business; Computer science; Geography","score_opus":0.002416383737380928,"score_gpt":0.17345099134757344,"score_spread":0.1710346076101925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0421198,0.009291592,0.90772545,0.00040076335,0.003929046,0.0034277176,0.00034500414,0.0006092341,0.032151416],"genre_scores_gemma":[0.9992045,0.0000184242,0.00026207746,0.0000091226175,0.00007697928,0.000018223447,0.000019534993,0.000045617526,0.0003454906],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99904084,0.00001820812,0.00033431454,0.0001892542,0.00026096925,0.00015639338],"domain_scores_gemma":[0.9991212,0.00019879315,0.00017216106,0.00039391158,0.00010323143,0.0000106876105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008963686,0.00032231622,0.00028182415,0.00024309578,0.00006149093,0.000020476919,0.00024528356,0.00034010026,0.000045251316],"category_scores_gemma":[0.00004523707,0.00017629689,0.00009513029,0.00037678145,0.00013905193,0.000065475666,0.000030411236,0.0008078931,3.1874853e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001826899,0.0000019095103,0.00021219766,0.00038612902,0.00015193234,3.6808808e-7,0.00051488227,0.98369235,0.0038457531,0.006572574,0.000060312566,0.004543335],"study_design_scores_gemma":[0.000838939,0.00010099703,0.006479766,0.0061844983,0.00055979664,0.00020108873,0.00011692715,0.9661346,0.006619559,0.00790054,0.0038242796,0.0010389815],"about_ca_topic_score_codex":0.000082333885,"about_ca_topic_score_gemma":0.0010508539,"teacher_disagreement_score":0.9570847,"about_ca_system_score_codex":0.00035360415,"about_ca_system_score_gemma":0.00014117005,"threshold_uncertainty_score":0.71891785},"labels":[],"label_agreement":null},{"id":"W4408398310","doi":"10.1007/978-3-031-84208-5_30","title":"A Case-Study Investigating the Integration of ISO 19650 and OpenBIM Principles","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Psychology","score_opus":0.020371216491315687,"score_gpt":0.22106220957997888,"score_spread":0.2006909930886632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398310","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12354621,0.013242281,0.71029764,0.0002815675,0.004082896,0.004322373,0.000109737986,0.0013257149,0.14279155],"genre_scores_gemma":[0.99757284,0.0000735781,0.0015781849,0.000018277591,0.00011531947,0.000045495282,0.000009752849,0.000051906867,0.00053462206],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990128,0.000012187684,0.00046030196,0.00022752829,0.00014017869,0.00014699194],"domain_scores_gemma":[0.9992749,0.0002926925,0.00007751453,0.00027158062,0.00005193715,0.000031341522],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001657033,0.0003359336,0.00034174483,0.0002875966,0.00005002299,0.000050708208,0.00012571609,0.00026851095,0.000026316371],"category_scores_gemma":[0.00017385882,0.00027325304,0.000059478072,0.00012879449,0.00005086674,0.00007375073,0.000054346452,0.0007774923,7.4954426e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000072178077,0.000018507295,0.0007543023,0.0010292697,0.0003545497,0.00018304586,0.0071694893,0.7821739,0.0033720897,0.04726424,0.000052157506,0.15762128],"study_design_scores_gemma":[0.00075334334,0.00014454231,0.00033826087,0.0033396767,0.00028697553,0.0012608251,0.00044948494,0.97520447,0.004419003,0.0061529097,0.006433674,0.0012168435],"about_ca_topic_score_codex":0.00011912047,"about_ca_topic_score_gemma":0.004800392,"teacher_disagreement_score":0.87402666,"about_ca_system_score_codex":0.000084540414,"about_ca_system_score_gemma":0.00003367115,"threshold_uncertainty_score":0.999972},"labels":[],"label_agreement":null},{"id":"W4408398312","doi":"10.1007/978-3-031-84208-5_27","title":"Comprehensive Clash Prevention in BIM Coordination Using a Rule-Based System","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.011081868773196488,"score_gpt":0.21141787229591003,"score_spread":0.20033600352271352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020198782,0.002239603,0.97831565,0.00002477552,0.0018636904,0.0005665819,0.000025841866,0.00060143176,0.014342543],"genre_scores_gemma":[0.9950428,0.000031181113,0.003995421,0.000017503811,0.00020871458,0.000050080645,0.00010328478,0.0001087901,0.00044223954],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871594,0.000014912351,0.00051585987,0.00031085993,0.0001918751,0.00025054268],"domain_scores_gemma":[0.9994014,0.00017353741,0.00007656669,0.0002308259,0.00008185262,0.000035811176],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000080068276,0.00043338526,0.00045791644,0.0010664413,0.000027996908,0.00004669534,0.0001180738,0.0006516623,0.00003977022],"category_scores_gemma":[0.00003392091,0.00051533186,0.00012917565,0.00024222066,0.000017659795,0.00009700702,0.000019837726,0.00079315505,0.0000056526706],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071092586,0.0000035868925,0.00003686148,0.0012955633,0.000038170816,0.000011575738,0.00004243913,0.9784041,0.0012039046,0.008923369,0.000010528961,0.010022798],"study_design_scores_gemma":[0.0005157277,0.000014227088,0.000053328968,0.004518484,0.00004340309,0.000014891289,0.00000692065,0.989255,0.0010359553,0.0014121457,0.002663262,0.00046665623],"about_ca_topic_score_codex":0.00002573382,"about_ca_topic_score_gemma":0.00044858016,"teacher_disagreement_score":0.9930229,"about_ca_system_score_codex":0.0010294951,"about_ca_system_score_gemma":0.00007390658,"threshold_uncertainty_score":0.9997298},"labels":[],"label_agreement":null},{"id":"W4408398314","doi":"10.1007/978-3-031-84208-5_21","title":"Evaluating the Interoperability of 3D Visualization Platforms in Federated Construction Simulation Settings","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Visualization; Computer science; Software engineering; Systems engineering; World Wide Web; Engineering; Data mining","score_opus":0.015061642982590061,"score_gpt":0.2657143780324126,"score_spread":0.25065273504982255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398314","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03198106,0.0010351181,0.95190537,0.00004178439,0.0018746906,0.000938381,0.000031627824,0.0003890461,0.011802903],"genre_scores_gemma":[0.9981042,0.00004485157,0.0014451272,0.000019401172,0.00009433564,0.000025136078,0.00008751886,0.000051365598,0.00012802583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986013,0.0000141598375,0.00072335044,0.0002603913,0.00022060786,0.00018015181],"domain_scores_gemma":[0.9991406,0.00038622002,0.000119983815,0.00020429006,0.00013039388,0.000018463577],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032457066,0.000328903,0.00036475208,0.00043139432,0.00004109582,0.000042259333,0.0001070054,0.00045380497,0.0001177521],"category_scores_gemma":[0.0003500049,0.00028582985,0.00007063932,0.0002510216,0.00004522641,0.0001394857,0.000027568385,0.00071211514,0.0000015643992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013966241,0.0000030325966,0.00014703897,0.00032460463,0.000029461911,4.884229e-7,0.00029146922,0.9315142,0.0010533701,0.0030637963,0.0000024303936,0.06355611],"study_design_scores_gemma":[0.00025420066,0.000030377669,0.00010232522,0.0011367624,0.000024467055,0.0000047518465,0.00000975745,0.99330646,0.0015840027,0.0030605188,0.00024388386,0.00024251938],"about_ca_topic_score_codex":0.000022717912,"about_ca_topic_score_gemma":0.00059084746,"teacher_disagreement_score":0.96612316,"about_ca_system_score_codex":0.00036158395,"about_ca_system_score_gemma":0.00004939272,"threshold_uncertainty_score":0.9999594},"labels":[],"label_agreement":null},{"id":"W4408398333","doi":"10.1007/978-3-031-84208-5_16","title":"A Design Thinking Approach for BIM Acceptance Based on Use Case Identification in a Manufacturer Company","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Identification (biology); Business; Engineering; Manufacturing engineering; Systems engineering; Engineering management; Construction engineering; Process management","score_opus":0.019182851683258437,"score_gpt":0.21457655194541583,"score_spread":0.1953937002621574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006578143,0.00041343414,0.9950652,0.000025330664,0.00068683136,0.00091381755,0.000039593062,0.0003258837,0.0024641356],"genre_scores_gemma":[0.92962736,0.00003960629,0.06884089,0.000109791996,0.00018970747,0.00035989832,0.00017043758,0.00015940321,0.0005029346],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855417,0.000014745786,0.00049982464,0.0004470775,0.00019013073,0.00029407864],"domain_scores_gemma":[0.99886805,0.0005765719,0.000076157296,0.00039060492,0.00004892381,0.000039677474],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002125523,0.000498062,0.00042448734,0.00090690807,0.00004894151,0.00013769505,0.00018168615,0.0006106472,0.000034252425],"category_scores_gemma":[0.00011846684,0.00053626014,0.00012676242,0.00016932147,0.000017738606,0.00014436862,0.000014200132,0.00090095104,0.0000020464745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023491142,0.000009224895,0.000007766308,0.00039421444,0.000030061361,0.000036079546,0.00012773719,0.9831096,0.0001966248,0.0058716005,0.000052117226,0.010141505],"study_design_scores_gemma":[0.00041194144,0.000015964675,0.000030363357,0.00064886693,0.000034765937,0.000043142107,0.0000028069085,0.99160326,0.0019633698,0.0036395448,0.0011204757,0.00048551918],"about_ca_topic_score_codex":0.000015041934,"about_ca_topic_score_gemma":0.00031867475,"teacher_disagreement_score":0.92956156,"about_ca_system_score_codex":0.0004339936,"about_ca_system_score_gemma":0.000039908275,"threshold_uncertainty_score":0.9997089},"labels":[],"label_agreement":null},{"id":"W4408398348","doi":"10.1007/978-3-031-84208-5_55","title":"Spatiotemporal Mapping for Buildings Construction Site Planning and Control","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Site planning; Geography; Control (management); Cartography; Architectural engineering; Environmental planning; Computer science; Engineering; Artificial intelligence","score_opus":0.006157371314594338,"score_gpt":0.1891771925065732,"score_spread":0.18301982119197885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398348","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00035372828,0.003726073,0.98569924,0.00006124771,0.0012686201,0.00041425362,0.00006861934,0.0003861945,0.008022056],"genre_scores_gemma":[0.96002764,0.00020223884,0.03730609,0.00010603098,0.00089020556,0.00012765893,0.00015290138,0.00018957135,0.0009976499],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998967,0.000003368382,0.00038005222,0.00029924436,0.0001063333,0.00024400205],"domain_scores_gemma":[0.9994371,0.00025265175,0.000066645014,0.00014480503,0.000052001542,0.00004679073],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000093034825,0.0003934072,0.0004171482,0.00053125067,0.00005025738,0.00006473819,0.000069517715,0.00052889495,0.000026728665],"category_scores_gemma":[0.00007571809,0.00045424487,0.000093037925,0.00007468658,0.00003383044,0.000101486075,0.000015169993,0.0005794981,0.0000011936211],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036809244,0.0000031340664,0.0009852437,0.0019725452,0.0003035506,0.0000118466605,0.00050110737,0.76921284,0.005042847,0.038763765,0.00022611581,0.18294019],"study_design_scores_gemma":[0.001768458,0.00005376542,0.00021878115,0.0039183553,0.00015550268,0.00010047791,0.000010630882,0.8627792,0.0022685267,0.01664569,0.11064524,0.0014353716],"about_ca_topic_score_codex":0.0000075595963,"about_ca_topic_score_gemma":0.000068608446,"teacher_disagreement_score":0.95967394,"about_ca_system_score_codex":0.00015422469,"about_ca_system_score_gemma":0.00002508216,"threshold_uncertainty_score":0.9997909},"labels":[],"label_agreement":null},{"id":"W4408398360","doi":"10.1007/978-3-031-84208-5_25","title":"Analysis of the Rationality of Extending LOD Standards from the Design Phase to the Production and Construction Phases","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Rationality; Production (economics); Phase (matter); Computer science; Epistemology; Physics; Philosophy; Economics; Microeconomics; Quantum mechanics","score_opus":0.011010128785015316,"score_gpt":0.23473900825131977,"score_spread":0.22372887946630446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398360","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034931956,0.002203546,0.99088997,0.0003503782,0.0012234615,0.0005153904,0.0004415464,0.000059643426,0.00082287367],"genre_scores_gemma":[0.9976501,0.0001842276,0.0017910918,0.000022351142,0.00019405525,0.0000265781,0.00002367422,0.000021576869,0.00008635853],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99898833,0.0000289232,0.00039141197,0.00020611589,0.00028669764,0.00009854196],"domain_scores_gemma":[0.99885535,0.00053851964,0.00010701018,0.0003447328,0.00013750997,0.000016896714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003162947,0.0002182826,0.00032158557,0.00024383725,0.00006620324,0.000026295604,0.00015191792,0.00015298398,0.000080458056],"category_scores_gemma":[0.0005852188,0.00013405223,0.00012683561,0.0004286861,0.00008184245,0.000054493208,0.000028908828,0.00035584316,9.868157e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022519334,0.000005226418,0.00019535133,0.00006159093,0.0006412546,1.6993125e-7,0.0003969536,0.9571081,0.0034051558,0.0054593137,0.000100532416,0.032603826],"study_design_scores_gemma":[0.0013044565,0.0001509848,0.0044608633,0.005155803,0.006538379,0.000037112444,0.00015743022,0.792202,0.1504499,0.017646423,0.020342356,0.0015542827],"about_ca_topic_score_codex":0.000038541828,"about_ca_topic_score_gemma":0.00096753833,"teacher_disagreement_score":0.9941569,"about_ca_system_score_codex":0.000131321,"about_ca_system_score_gemma":0.000059468646,"threshold_uncertainty_score":0.54664916},"labels":[],"label_agreement":null},{"id":"W4408398491","doi":"10.1007/978-3-031-84208-5_24","title":"Digital Configuration Platforms for Residential Modular Construction Projects: A Comparative Study","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Modular design; Computer science; Systems engineering; Architectural engineering; Engineering; Operating system","score_opus":0.01320393233437628,"score_gpt":0.2225163756408698,"score_spread":0.2093124433064935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020043505,0.0005915123,0.939778,0.000014846457,0.0022889997,0.0021292667,0.00014053159,0.0005997426,0.052452795],"genre_scores_gemma":[0.9955219,0.00002609,0.0015023446,0.0000073583833,0.00043115337,0.00024895064,0.0002752044,0.000081081154,0.0019059124],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863243,0.0000030772671,0.00053556013,0.0003718471,0.00021277349,0.0002443372],"domain_scores_gemma":[0.99935216,0.0001664762,0.00008428686,0.00023717475,0.000119496035,0.0000403814],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000073408584,0.00047996023,0.0005089612,0.0005578143,0.00005845291,0.00015692096,0.00012691581,0.00044669097,0.000050880804],"category_scores_gemma":[0.000070231414,0.00049988355,0.00013451709,0.00012338469,0.000036526955,0.000293952,0.000019726202,0.0006064257,0.0000058918413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010535563,0.000034070683,0.000105226485,0.00071687344,0.0006108621,0.000012768555,0.0015756452,0.9034199,0.0009159406,0.03735718,0.0002588734,0.0548873],"study_design_scores_gemma":[0.0037730015,0.00055299996,0.0001635404,0.0022394217,0.00040072243,0.000093074086,0.0003497178,0.9233923,0.008438755,0.03402399,0.023854632,0.0027178635],"about_ca_topic_score_codex":0.000005595887,"about_ca_topic_score_gemma":0.00047184754,"teacher_disagreement_score":0.9935176,"about_ca_system_score_codex":0.00028702,"about_ca_system_score_gemma":0.000063320855,"threshold_uncertainty_score":0.99974525},"labels":[],"label_agreement":null},{"id":"W4408399022","doi":"10.1007/978-3-031-84208-5_62","title":"An Advanced Work Packaging Inspired Ontology for Industrial Construction Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Ontology; Work (physics); Computer science; Systems engineering; Manufacturing engineering; Software engineering; Construction engineering; Architectural engineering; Engineering; Mechanical engineering; Philosophy; Epistemology","score_opus":0.013329347926616726,"score_gpt":0.21536711492111624,"score_spread":0.20203776699449952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408399022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012218163,0.0017800182,0.95900697,0.000095755815,0.0084867915,0.0014426629,0.000075080316,0.0013719357,0.02651897],"genre_scores_gemma":[0.95872325,0.00020558307,0.035982147,0.00009624377,0.0023113184,0.00051387714,0.0004567181,0.00035068113,0.0013602078],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859893,0.0000089926,0.00047552952,0.0004221929,0.00013223747,0.0003620894],"domain_scores_gemma":[0.99925274,0.00020917079,0.000081384576,0.0003200034,0.00007318257,0.00006350983],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009226817,0.0005012845,0.00052084133,0.000625144,0.000051451858,0.00005316414,0.00016813807,0.001055811,0.00005281644],"category_scores_gemma":[0.00013766323,0.00057221734,0.00012654466,0.00018755603,0.00004156136,0.00015530735,0.00001639996,0.0009955274,0.0000022041188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006808901,0.000006479589,0.0001693069,0.0003252391,0.00012645173,0.00000629796,0.0001878818,0.46923757,0.0010200898,0.01938426,0.00010601019,0.50936234],"study_design_scores_gemma":[0.0099879205,0.00073814194,0.0002681726,0.0121363485,0.0007237753,0.00024744138,0.00007839736,0.5933474,0.022915848,0.05232598,0.29970187,0.0075287195],"about_ca_topic_score_codex":0.0000058045994,"about_ca_topic_score_gemma":0.00048280015,"teacher_disagreement_score":0.9575014,"about_ca_system_score_codex":0.00034452384,"about_ca_system_score_gemma":0.00009161022,"threshold_uncertainty_score":0.99967295},"labels":[],"label_agreement":null},{"id":"W4408399125","doi":"10.1007/978-3-031-84208-5_15","title":"Exploring the Potential of Digital Signature of Building Information Models to Improve Trust, Transparency, and Traceability in Construction Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Traceability; Transparency (behavior); Digital signature; Computer security; Signature (topology); Computer science; Business; Software engineering; Mathematics","score_opus":0.01218088641596167,"score_gpt":0.1830416333859824,"score_spread":0.17086074697002074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408399125","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057063457,0.00073957845,0.9353974,0.000047512312,0.0011913802,0.000928882,0.00015426482,0.00017041781,0.0043071182],"genre_scores_gemma":[0.9975965,0.000107495696,0.0021511216,0.0000031970967,0.000048665028,0.000045107383,0.000014925361,0.000021496042,0.000011471204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989119,0.00000507639,0.0005780178,0.00017513323,0.00017193958,0.00015790612],"domain_scores_gemma":[0.9995508,0.00009952415,0.000075365526,0.00018234889,0.000064796914,0.000027117272],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000106290754,0.0002722674,0.00035089577,0.00053813035,0.000016073918,0.000033160253,0.00010919015,0.00027249794,0.0000046667433],"category_scores_gemma":[0.0000579324,0.00024870175,0.000076488395,0.00019352489,0.000040442395,0.00061629293,0.000021971835,0.0006202584,9.29274e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020885664,0.0000028623804,0.000033852582,0.0007398164,0.00002974951,5.249952e-7,0.0010541747,0.8847545,0.0020902245,0.0061631156,8.9151723e-7,0.10510944],"study_design_scores_gemma":[0.00056966284,0.00007380167,0.00034609545,0.0018624084,0.00006981544,0.000018803483,0.00012113747,0.96742797,0.012955241,0.015803015,0.00018650746,0.0005655387],"about_ca_topic_score_codex":0.000021399102,"about_ca_topic_score_gemma":0.00010588984,"teacher_disagreement_score":0.94053304,"about_ca_system_score_codex":0.00011364552,"about_ca_system_score_gemma":0.000037553073,"threshold_uncertainty_score":0.99999654},"labels":[],"label_agreement":null},{"id":"W4408421119","doi":"10.1007/978-3-031-84208-5_32","title":"Re-modeling of Built Asset Information to Improve and Optimize Asset Management","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Asset (computer security); IT asset management; Asset management; Business; Computer science; Risk analysis (engineering); Finance; Computer security","score_opus":0.005329380067120061,"score_gpt":0.19517373444262703,"score_spread":0.18984435437550698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408421119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009624167,0.0005042741,0.9242971,0.000054170152,0.000800739,0.00035435686,0.000056104065,0.00018687025,0.073650174],"genre_scores_gemma":[0.94347376,0.000788205,0.053849585,0.00014028688,0.00021495181,0.00011673881,0.00019928048,0.00011390745,0.0011032847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990084,0.0000026900634,0.0004656435,0.00017806234,0.00016530928,0.00017990486],"domain_scores_gemma":[0.99953973,0.000062707375,0.000048609778,0.00024523542,0.00005708731,0.000046639037],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009862886,0.00031474922,0.0003301739,0.00064079,0.000017155988,0.000046490342,0.00011632485,0.00033658778,0.000036289257],"category_scores_gemma":[0.000044543394,0.00034773495,0.00006296195,0.000107139495,0.000008446569,0.00018557579,0.000059873546,0.00043628714,0.0000035331743],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000059301065,0.0000011413808,0.000003759795,0.00071725657,0.0000707202,0.0000013339538,0.0000968082,0.9533044,0.00010504834,0.0056231753,0.00009177438,0.039978653],"study_design_scores_gemma":[0.0002516257,0.00002128007,0.000010174124,0.0010038316,0.000054447915,0.0000031722348,0.000009095136,0.9876435,0.00053712446,0.001974047,0.008106227,0.00038551044],"about_ca_topic_score_codex":0.00001362247,"about_ca_topic_score_gemma":0.00015748307,"teacher_disagreement_score":0.9433775,"about_ca_system_score_codex":0.00013829376,"about_ca_system_score_gemma":0.000013753809,"threshold_uncertainty_score":0.9998975},"labels":[],"label_agreement":null},{"id":"W4408421129","doi":"10.1007/978-3-031-84208-5_44","title":"Guidelines for Designing a Facility Management Digital Twin Dashboard","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Fuseforward (Canada); Toronto Metropolitan University","funders":"","keywords":"Dashboard; Computer science; Database","score_opus":0.01894341824324325,"score_gpt":0.22998022809627552,"score_spread":0.21103680985303228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408421129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000010433043,0.0016599442,0.9361292,0.00006148081,0.0011135332,0.000500722,0.00015496026,0.000574268,0.059795428],"genre_scores_gemma":[0.5162096,0.002343536,0.3588396,0.000973483,0.004568041,0.0022441826,0.0028248006,0.0012283911,0.11076838],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99865556,0.0000021599615,0.0005251217,0.00035665525,0.00016729301,0.00029321696],"domain_scores_gemma":[0.9993424,0.0001657683,0.000040585288,0.00029262458,0.00011179536,0.000046842426],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010096008,0.00047352523,0.00039705087,0.0004129881,0.000032657514,0.00009947907,0.00017643759,0.000406694,0.00006229411],"category_scores_gemma":[0.00014763315,0.00050942256,0.00018772332,0.00009032198,0.000017436918,0.0001110243,0.000040774612,0.00044337797,0.000010070172],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010508382,0.0000032611297,0.000010924199,0.0010904975,0.00019936259,0.00000847682,0.00005561869,0.71180564,0.00014367703,0.009183629,0.0015322146,0.2759562],"study_design_scores_gemma":[0.00080840796,0.00004060855,0.000012390056,0.0025447193,0.00015923649,0.00001832984,0.000009236649,0.42438602,0.001676374,0.021218156,0.54757684,0.0015496492],"about_ca_topic_score_codex":0.0000020448738,"about_ca_topic_score_gemma":0.00006555363,"teacher_disagreement_score":0.57728964,"about_ca_system_score_codex":0.00024021561,"about_ca_system_score_gemma":0.000020783607,"threshold_uncertainty_score":0.9997357},"labels":[],"label_agreement":null},{"id":"W4408623108","doi":"10.51594/estj.v6i2.1830","title":"Building Information Modelling (BIM) for construction project management: A literature bibliometric analysis approach","year":2025,"lang":"en","type":"article","venue":"Engineering Science & Technology Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Computer science; Engineering; Construction engineering; Operations management","score_opus":0.005920087760094467,"score_gpt":0.22658058917839669,"score_spread":0.2206605014183022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408623108","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03637105,0.00064426137,0.9607218,0.000037787173,0.0007539481,0.00021018182,0.000004234767,0.00048509927,0.0007716375],"genre_scores_gemma":[0.6057024,0.00014706422,0.39404404,0.000005585379,0.000028557964,0.00005024572,0.0000036520541,0.0000055375194,0.000012928626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989616,0.0000035461248,0.00034046854,0.00016025636,0.00021274848,0.00032132605],"domain_scores_gemma":[0.99944425,0.000014380995,0.00006765814,0.00016917964,0.00026829375,0.000036232155],"candidate_categories":["bibliometrics"],"consensus_categories":["bibliometrics"],"category_scores_codex":[0.00045528257,0.00014841948,0.00016784784,0.15802431,0.00031615663,0.00045323928,0.0003430246,0.00016168012,0.0000014183056],"category_scores_gemma":[0.000053510867,0.00014325367,0.000082805396,0.19822639,0.00011476052,0.0013264313,0.00002970058,0.00041579228,6.9301905e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026046764,0.0000039526117,0.00015082197,0.00007562005,0.00014195309,4.7818133e-7,0.000043173273,0.7921626,0.0008890516,0.117123134,0.000042616357,0.08936397],"study_design_scores_gemma":[0.00022097748,0.000014114825,0.00016383493,0.000071630864,0.00013182641,0.00012732855,0.00020518016,0.9883044,0.0038130751,0.0027637873,0.0040367176,0.00014712244],"about_ca_topic_score_codex":3.846104e-7,"about_ca_topic_score_gemma":5.493756e-8,"teacher_disagreement_score":0.56933135,"about_ca_system_score_codex":0.00019767009,"about_ca_system_score_gemma":0.00004683854,"threshold_uncertainty_score":0.85151875},"labels":[],"label_agreement":null},{"id":"W4408654474","doi":"10.5006/mp2014_53_11-32","title":"Cost Effective Cathodic Protection System for Concrete Structures","year":2014,"lang":"en","type":"article","venue":"Materials performance","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Barrie Urology Group","funders":"","keywords":"Cathodic protection; Forensic engineering; Galvanic anode; Materials science; Corrosion; Engineering; Metallurgy; Electrochemistry; Chemistry","score_opus":0.008985806292215487,"score_gpt":0.20351534764603105,"score_spread":0.19452954135381556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408654474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9362534,0.000019933066,0.058981452,0.0000047917815,0.0026182483,0.0011743807,0.00002701106,0.0003581156,0.0005626366],"genre_scores_gemma":[0.99760497,0.00000433971,0.0005378435,0.000007645138,0.00039623363,0.0013905163,0.000017732302,0.000019417908,0.000021322625],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99951977,0.000027697839,0.00015728302,0.00010398548,0.000057510108,0.00013375722],"domain_scores_gemma":[0.99977267,0.000014150951,0.00003921851,0.000104057566,0.000046185312,0.000023740837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016753799,0.00010848043,0.00013982908,0.00004281617,0.000102203674,0.00005973905,0.00005001221,0.000077388155,0.000024660669],"category_scores_gemma":[0.000010143879,0.00009428584,0.00002026848,0.000044008615,0.000021151964,0.00012681066,0.0000048767347,0.00004241348,0.000030199564],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008206341,5.6585003e-7,0.00006269674,0.001208454,0.000015537411,6.992289e-8,0.00015259121,0.0016149813,0.8956856,0.0036966244,0.000120673125,0.09736012],"study_design_scores_gemma":[0.0003320861,0.00007556373,0.0013266286,0.000060349932,0.000011688186,0.000020109213,0.000028451379,0.02952926,0.9618881,0.0000536176,0.0065441364,0.00013004866],"about_ca_topic_score_codex":0.000010000926,"about_ca_topic_score_gemma":0.000001380924,"teacher_disagreement_score":0.09723007,"about_ca_system_score_codex":0.00007195184,"about_ca_system_score_gemma":0.0000046138666,"threshold_uncertainty_score":0.3844865},"labels":[],"label_agreement":null},{"id":"W4408727525","doi":"10.1680/jensu.23.00041","title":"Retrofitting of building components using Building Information Modelling for sustainability","year":2025,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Engineering Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Retrofitting; Sustainability; Architectural engineering; Construction engineering; Building information modeling; Computer science; Engineering; Structural engineering; Operations management","score_opus":0.006974280786642538,"score_gpt":0.2190565852055982,"score_spread":0.21208230441895567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408727525","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5207801,0.00007746193,0.47787198,0.000036932768,0.00040545428,0.00057328865,0.000011909702,0.000112927904,0.0001299749],"genre_scores_gemma":[0.9841159,0.0000069947755,0.015769621,0.0000027998951,0.000030318482,0.000048751124,0.0000028986417,0.00001784753,0.00000489174],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998085,0.0000069203584,0.0010770186,0.00019509328,0.00029642406,0.0003395048],"domain_scores_gemma":[0.99707395,0.00011299485,0.0003018219,0.0002189621,0.0022442376,0.00004801141],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00082015357,0.00027431012,0.00046180448,0.00053658837,0.00011974248,0.000029781686,0.00035542238,0.0001981654,0.0000012658102],"category_scores_gemma":[0.0014084453,0.0002691591,0.00026351347,0.0010268636,0.00018006371,0.00091018464,0.000084911604,0.00027623362,1.7582565e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033246364,0.000019217658,0.0019273908,0.0064906455,0.00006415154,1.714136e-8,0.00023704875,0.8005492,0.017314391,0.17276654,0.000007512451,0.0005906235],"study_design_scores_gemma":[0.00042660334,0.000021794518,0.0006943427,0.00046490334,0.00008254693,0.0000021286091,0.0007864371,0.89456713,0.09144222,0.011033622,0.00028621685,0.00019203319],"about_ca_topic_score_codex":0.00006777947,"about_ca_topic_score_gemma":9.441488e-7,"teacher_disagreement_score":0.4633358,"about_ca_system_score_codex":0.0011399112,"about_ca_system_score_gemma":0.0002099621,"threshold_uncertainty_score":0.99997604},"labels":[],"label_agreement":null},{"id":"W4408739210","doi":"10.23977/jaip.2025.080113","title":"Intelligent design and dynamic adaptation model of building facade based on artificial intelligence","year":2025,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Facade; Adaptation (eye); Architectural engineering; Computer science; Artificial intelligence; Engineering; Civil engineering; Psychology","score_opus":0.06069280218206569,"score_gpt":0.32118288920734994,"score_spread":0.26049008702528426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408739210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010688844,0.0003398215,0.98663133,0.0007938332,0.00089195784,0.00020809044,0.0000036574118,0.000039658375,0.00040279602],"genre_scores_gemma":[0.8735207,0.00039266935,0.12587734,0.00011834471,0.00005617184,0.0000063463285,7.0177623e-7,0.000017038265,0.000010718434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977581,0.00015834173,0.0012885579,0.00019337492,0.00039307534,0.00020856813],"domain_scores_gemma":[0.9976014,0.0010602805,0.00048722778,0.0001754382,0.000588281,0.00008737837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010523064,0.00021797647,0.0003065728,0.0006262535,0.0001049482,0.000107124644,0.0002280868,0.0001685259,0.000028618795],"category_scores_gemma":[0.0011325926,0.00021025178,0.000114123824,0.0005442196,0.00013588753,0.0006631864,0.000019422632,0.0006295241,0.0000070823894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003276695,0.000069613096,0.000002151864,0.000029225479,0.000039058497,0.000002449973,0.00037691323,0.6299579,0.011568758,0.043169875,0.000012371622,0.31444404],"study_design_scores_gemma":[0.000014528472,0.00016825365,0.0000032384255,0.00016783996,0.00008496032,0.00001560968,0.0022937965,0.7448275,0.2033126,0.04890966,0.00008146351,0.00012056399],"about_ca_topic_score_codex":0.00001087439,"about_ca_topic_score_gemma":0.000010356085,"teacher_disagreement_score":0.86283183,"about_ca_system_score_codex":0.00016810356,"about_ca_system_score_gemma":0.00019843783,"threshold_uncertainty_score":0.8573818},"labels":[],"label_agreement":null},{"id":"W4408778588","doi":"10.3390/su17072877","title":"Integrating Building Information Modeling and Life Cycle Assessment to Enhance the Decisions Related to Selecting Construction Methods at the Conceptual Design Stage of Buildings","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Stage (stratigraphy); Life-cycle assessment; Architectural engineering; Construction engineering; Conceptual design; Computer science; Systems engineering; Management science; Engineering; Process management; Risk analysis (engineering); Operations management; Business; Production (economics); Human–computer interaction","score_opus":0.010270131185869828,"score_gpt":0.33322496024491227,"score_spread":0.32295482905904244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408778588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4617062,0.000036338206,0.53689575,0.00048813684,0.00014716569,0.00046814754,0.0000023000237,0.00006119574,0.0001947643],"genre_scores_gemma":[0.8646657,0.0000063920197,0.13509329,0.000081671795,0.000008220891,0.000094001385,0.0000013578751,0.000006533844,0.00004284045],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99859655,0.0002721609,0.0005849449,0.00018316331,0.00015492876,0.00020826857],"domain_scores_gemma":[0.9981028,0.0008124093,0.00008533767,0.00025965789,0.0006768138,0.00006301934],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020223798,0.00014455404,0.00017804228,0.00013909546,0.00047359834,0.00009198962,0.00014208836,0.00008699153,0.000017123704],"category_scores_gemma":[0.003863611,0.0001011812,0.000045977242,0.0008016454,0.00013096453,0.00034096363,0.000117649906,0.0003127965,4.994857e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023414696,0.0000033081374,0.00047971297,0.000041560295,0.000027445652,3.9330523e-8,0.0036957762,0.68379027,0.0034833953,0.054819845,0.000032611013,0.25360262],"study_design_scores_gemma":[0.00014186365,0.000046418463,0.0005640159,0.0000812657,0.00002952973,0.0000036585418,0.044945627,0.91495806,0.019970506,0.018300988,0.0007968222,0.0001612574],"about_ca_topic_score_codex":0.00018798962,"about_ca_topic_score_gemma":0.000032433738,"teacher_disagreement_score":0.4029595,"about_ca_system_score_codex":0.0007643954,"about_ca_system_score_gemma":0.00023470754,"threshold_uncertainty_score":0.46253824},"labels":[],"label_agreement":null},{"id":"W4408813104","doi":"10.3390/architecture5020022","title":"Life Cycle Homes for Adaptability, Circularity, and Sustainability","year":2025,"lang":"en","type":"article","venue":"Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Adaptability; Sustainability; Computer science; Biology; Ecology","score_opus":0.003997414508288337,"score_gpt":0.21834362843253283,"score_spread":0.2143462139242445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408813104","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6069304,0.0013242507,0.38353854,0.0035352784,0.00041092743,0.00053739577,0.000022707773,0.0003456208,0.0033548996],"genre_scores_gemma":[0.9987045,0.000008826721,0.0010083613,0.00010836007,0.00003934181,0.000053533622,0.000005194905,0.0000066175685,0.00006527463],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995914,0.00001426827,0.00010228424,0.0001318143,0.00004171965,0.00011848018],"domain_scores_gemma":[0.99967307,0.000067676025,0.000007218405,0.00014530162,0.000054878692,0.000051878753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000074651834,0.000081621074,0.0000981358,0.000059726848,0.00006932454,0.000029647443,0.000053275777,0.00007125499,0.000013610945],"category_scores_gemma":[0.00019143394,0.0000748403,0.000044424934,0.00010588813,0.000061500155,0.0000343201,0.000021438682,0.00011910399,4.107805e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047541267,0.00003327659,0.025239527,0.0014349717,0.00012489791,6.3376575e-7,0.0007493746,0.024420975,0.0006048127,0.11765993,0.0020080358,0.827676],"study_design_scores_gemma":[0.0007019608,0.000039367038,0.07384211,0.000029584482,0.00004714837,0.000009622301,0.00059180515,0.03886403,0.0009944149,0.82920796,0.055396304,0.00027568438],"about_ca_topic_score_codex":0.00001849926,"about_ca_topic_score_gemma":0.00008086829,"teacher_disagreement_score":0.8274003,"about_ca_system_score_codex":0.000037062888,"about_ca_system_score_gemma":0.000059429265,"threshold_uncertainty_score":0.3051899},"labels":[],"label_agreement":null},{"id":"W4408872967","doi":"10.1061/9780784485910.040","title":"Simulation-Based Modular Construction Shop Floor Design for Productivity Optimization","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Productivity; Computer science; Modular construction; Industrial engineering; Manufacturing engineering; Engineering; Programming language","score_opus":0.013283074590521709,"score_gpt":0.2291192954590902,"score_spread":0.2158362208685685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408872967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028488338,0.000033744633,0.99392927,0.00014887622,0.00088513363,0.00054214423,0.0000050595445,0.00046737836,0.0011395768],"genre_scores_gemma":[0.76504445,0.0000014016209,0.23449534,0.000028120583,0.00006257571,0.00010889565,0.00002529928,0.000010940291,0.0002230044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994846,0.00002062088,0.00016984262,0.00015791021,0.00006485409,0.00010217328],"domain_scores_gemma":[0.9995272,0.00012230006,0.000020269457,0.00013558536,0.00017494416,0.000019709487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000102895436,0.00010190087,0.00009389564,0.0001391709,0.00009438426,0.00004106994,0.000040316267,0.00008443632,0.00008935076],"category_scores_gemma":[0.00012479721,0.00010305413,0.000042479725,0.00024877553,0.00003116332,0.00017925707,0.0000026006455,0.00005230998,0.0000036595166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019649015,0.0000084597705,0.00006851799,0.00003639273,0.00001834973,2.6052088e-8,0.0000068435534,0.96949583,0.00086072844,0.004520455,0.00012662071,0.024838146],"study_design_scores_gemma":[0.00032970821,0.00001252686,0.000039299222,0.000012377914,0.000021880367,2.5897836e-7,0.00002575369,0.9756962,0.021897513,0.0012023242,0.000662116,0.00010003132],"about_ca_topic_score_codex":0.000002819682,"about_ca_topic_score_gemma":0.0000026821492,"teacher_disagreement_score":0.7621956,"about_ca_system_score_codex":0.0000698469,"about_ca_system_score_gemma":0.000048929625,"threshold_uncertainty_score":0.42024255},"labels":[],"label_agreement":null},{"id":"W4408963024","doi":"10.61091/jcmcc125-26","title":"Research on balancing strategies between modularization and personalization in prefabricated building design and simulation","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Personalization; Architectural engineering; Computer science; Mass customization; Engineering; Systems engineering; World Wide Web; Programming language","score_opus":0.02725382913677415,"score_gpt":0.30521743382505206,"score_spread":0.2779636046882779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408963024","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6719801,0.00022284825,0.3262648,0.00002617105,0.0011771239,0.0001621191,2.7523618e-7,0.000023137696,0.00014341748],"genre_scores_gemma":[0.9958368,0.000048993268,0.0038781255,0.0000026857635,0.0002165989,0.000001593294,9.2359875e-7,0.000013212012,0.0000010483514],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987636,0.00014065066,0.0005346275,0.0001246037,0.00028308996,0.00015342032],"domain_scores_gemma":[0.9985947,0.000848687,0.0001515146,0.00006535538,0.00028980154,0.000049953243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014071233,0.0001332773,0.00029427084,0.00048220617,0.00016798881,0.000262344,0.00007252463,0.00013927667,6.412335e-7],"category_scores_gemma":[0.00017323242,0.00012999872,0.000021154518,0.00046343365,0.000050852286,0.000253464,0.000036715206,0.00037847302,7.9404245e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051829542,0.000056712302,0.001536531,0.00036858837,0.000060793347,0.0000022418003,0.0012957754,0.119953476,0.0021674174,0.8661935,0.000014769722,0.008298369],"study_design_scores_gemma":[0.0011984098,0.0001579559,0.0018179936,0.0005596605,0.00002382113,0.000004587599,0.0007169871,0.683572,0.00055047945,0.31127775,0.00002087243,0.000099502824],"about_ca_topic_score_codex":0.000005102098,"about_ca_topic_score_gemma":2.1496666e-7,"teacher_disagreement_score":0.5636185,"about_ca_system_score_codex":0.00010795898,"about_ca_system_score_gemma":0.000056999015,"threshold_uncertainty_score":0.5301194},"labels":[],"label_agreement":null},{"id":"W4408994207","doi":"10.1061/jcemd4.coeng-15335","title":"Enhancing the Manufacturing Process in Light-Gauge Steel Off-Site Construction Using Semiautomation","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure","funders":"","keywords":"Gauge (firearms); Process (computing); Manufacturing engineering; Engineering; Materials science; Computer science; Metallurgy","score_opus":0.0029992384564745574,"score_gpt":0.1955731219444556,"score_spread":0.19257388348798105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408994207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9027221,0.0006764783,0.093299635,0.000113640526,0.001937834,0.00017073203,0.0000010267587,0.00008547445,0.000993036],"genre_scores_gemma":[0.99229056,0.0005474774,0.006997393,0.00001572337,0.00010136568,0.000008633031,8.642514e-7,0.000012466672,0.000025527464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999045,0.000018037772,0.00053377316,0.00010174168,0.00015584572,0.00014558824],"domain_scores_gemma":[0.9996591,0.000024092227,0.00012648416,0.00009533092,0.000062595216,0.000032390748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024971267,0.00014786096,0.00018225971,0.0005644663,0.00007844812,0.00008052129,0.00007269937,0.00007066669,0.000006967475],"category_scores_gemma":[0.00000983008,0.0001256789,0.000049859977,0.0002781414,0.00003277429,0.00035164368,0.000016036242,0.00025386948,6.2237075e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005270297,0.00001974861,0.001288654,0.0013969874,0.00038293345,0.000020227573,0.0008001895,0.6751028,0.019302646,0.03550808,0.00010133266,0.26602373],"study_design_scores_gemma":[0.003958402,0.000084412706,0.020417105,0.004596427,0.0006083599,0.0030542135,0.011477374,0.68686783,0.23154803,0.004584718,0.03174405,0.0010590869],"about_ca_topic_score_codex":0.0000026433772,"about_ca_topic_score_gemma":0.000006670117,"teacher_disagreement_score":0.26496464,"about_ca_system_score_codex":0.00014747426,"about_ca_system_score_gemma":0.000019082046,"threshold_uncertainty_score":0.5125037},"labels":[],"label_agreement":null},{"id":"W4409198938","doi":"10.1016/b978-0-443-23718-8.00011-9","title":"Application of multicriteria decision making for ranking and selection of biocomposites for external strengthening of concrete: a case study","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Ranking (information retrieval); Selection (genetic algorithm); Operations research; Computer science; Mathematics; Machine learning","score_opus":0.009585281841288984,"score_gpt":0.26126323020549747,"score_spread":0.2516779483642085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409198938","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35891837,0.002458339,0.59690636,0.0000019114489,0.0006655846,0.007570283,0.00040551668,0.00014168293,0.032931916],"genre_scores_gemma":[0.9626159,0.00001049394,0.034411408,0.0000016556182,0.000062125226,0.00017205924,0.000007745603,0.000032463962,0.0026861595],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903214,0.000009272184,0.0006055298,0.00018094199,0.000094986506,0.000077155455],"domain_scores_gemma":[0.999082,0.00027186098,0.0002753796,0.00011110234,0.00024467637,0.000014947233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016287772,0.00017650271,0.00038698674,0.0002310267,0.000048724185,0.000012475408,0.000057275145,0.00014325787,0.000003963009],"category_scores_gemma":[0.000016311267,0.00018175198,0.00010741198,0.000017801121,0.00004125011,0.0000324997,0.000018229586,0.00008793055,4.0306023e-8],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000101432524,0.0000030520932,0.00009007523,0.0006863186,0.000114445385,6.094268e-7,0.0004289027,0.000048407524,0.025162036,0.0013589967,0.0000013669945,0.97200435],"study_design_scores_gemma":[0.014612789,0.002907594,0.00032993796,0.0227906,0.0050712805,0.0010199168,0.0029489426,0.68408877,0.20226848,0.02769626,0.03366746,0.0025979462],"about_ca_topic_score_codex":0.000002768886,"about_ca_topic_score_gemma":0.000024246408,"teacher_disagreement_score":0.9694064,"about_ca_system_score_codex":0.00002864066,"about_ca_system_score_gemma":0.000018788707,"threshold_uncertainty_score":0.7411631},"labels":[],"label_agreement":null},{"id":"W4409253772","doi":"10.1007/978-3-031-87364-5_53","title":"Automated Stakeout Survey for Efficient Earthwork Construction Project Control","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Control (management); Engineering; Computer science; Construction engineering; Artificial intelligence; Geotechnical engineering","score_opus":0.009571778823065024,"score_gpt":0.2108342971736058,"score_spread":0.20126251835054076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409253772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00023140563,0.0017201438,0.97700995,0.000022558974,0.0038076113,0.0012777181,0.00050208985,0.0022133666,0.0132151535],"genre_scores_gemma":[0.98811674,0.00013877465,0.00809683,0.00005318381,0.00062639825,0.00031630683,0.0005955234,0.00028690477,0.0017693168],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998548,0.000015474596,0.00052041584,0.0003731213,0.00018438716,0.00035861222],"domain_scores_gemma":[0.9988859,0.0005777068,0.00007630706,0.00028036203,0.00013500403,0.00004468305],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00022119934,0.000518808,0.000551772,0.00060627674,0.000050590217,0.00006834758,0.00013520855,0.00070162595,0.000054638644],"category_scores_gemma":[0.00021879413,0.0005549288,0.0001628139,0.00018943091,0.00003899591,0.000041377487,0.000013409044,0.00067425886,0.0000058998244],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031848198,0.000004285917,0.000054768538,0.00039311,0.00015542374,0.0000027680358,0.000061014835,0.9757699,0.00020407369,0.0052651954,0.000375015,0.017682595],"study_design_scores_gemma":[0.0007593352,0.000032461237,0.00012633447,0.00076440384,0.000066442924,0.000018074068,0.0000016682754,0.981549,0.00047501427,0.0005000166,0.015106123,0.0006010892],"about_ca_topic_score_codex":0.000026376465,"about_ca_topic_score_gemma":0.00096107385,"teacher_disagreement_score":0.98788536,"about_ca_system_score_codex":0.00028651385,"about_ca_system_score_gemma":0.00010657861,"threshold_uncertainty_score":0.99969023},"labels":[],"label_agreement":null},{"id":"W4409276712","doi":"10.1061/jcemd4.coeng-15014","title":"Evaluating the Potential Impact of Building Design Strategies on Material Recovery during Deconstruction","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Deconstruction (building); Architectural engineering; Construction engineering; Engineering; Waste management","score_opus":0.008487392371202229,"score_gpt":0.2564341499210844,"score_spread":0.24794675754988216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409276712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75003386,0.00012393348,0.24748644,0.000016048763,0.0019925863,0.00010419074,0.0000017896042,0.000037296562,0.00020387078],"genre_scores_gemma":[0.98191416,0.00036383775,0.017568776,0.0000019920744,0.00012236372,0.000005714423,4.3261608e-7,0.000009751368,0.000012965921],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991822,0.000031346124,0.0004351593,0.00008120493,0.00015349274,0.00011657297],"domain_scores_gemma":[0.99961865,0.000033883418,0.00014538298,0.00009370979,0.00008187076,0.000026500391],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027897648,0.000134517,0.00017473217,0.00040075812,0.00007700517,0.000093970935,0.000075081116,0.000052350082,0.000017583898],"category_scores_gemma":[0.000013571253,0.00010279211,0.000107420856,0.00018341537,0.000044814788,0.00025456262,0.000014826019,0.00015322081,1.9799528e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012471965,0.0000045857564,0.000025898142,0.0001290849,0.00032543944,0.000002310093,0.000019128775,0.8680329,0.05127796,0.008392065,0.00002817332,0.07163776],"study_design_scores_gemma":[0.0045288866,0.0017126722,0.037906934,0.0028122766,0.0011563384,0.0034973735,0.0036261347,0.7985204,0.1303285,0.014655923,0.00029755285,0.0009570426],"about_ca_topic_score_codex":0.0000028747888,"about_ca_topic_score_gemma":1.6307044e-7,"teacher_disagreement_score":0.23188032,"about_ca_system_score_codex":0.000109832916,"about_ca_system_score_gemma":0.000030194675,"threshold_uncertainty_score":0.41917405},"labels":[],"label_agreement":null},{"id":"W4409602118","doi":"10.61091/jcmcc127b-037","title":"An overall structural performance modeling and multi-objective optimization design method for Huizhou architecture based on BIM platform","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architecture; Computer science; Building information modeling; Engineering; Systems engineering; Operations management","score_opus":0.015018149701936162,"score_gpt":0.2625219125733996,"score_spread":0.24750376287146342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409602118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1596802,0.00006866522,0.835135,0.000016039428,0.00468875,0.000294843,0.0000020482667,0.000048776423,0.00006568707],"genre_scores_gemma":[0.70335233,0.000008986042,0.29632968,0.000014714125,0.00026803336,0.0000038306366,0.000001856204,0.000019872332,6.840529e-7],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99877876,0.00005428222,0.00059661036,0.00015826865,0.00022040757,0.00019168173],"domain_scores_gemma":[0.998799,0.00041448133,0.00023392425,0.00012267078,0.000344257,0.00008566363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007115412,0.00024063131,0.00042006545,0.00027529945,0.00026859494,0.0001866606,0.00014090571,0.00016664638,0.000001646015],"category_scores_gemma":[0.00011447415,0.00021050102,0.00007886077,0.0001588282,0.000028136183,0.00023018169,0.000020658072,0.00036173034,5.29582e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018476482,0.00005085215,0.000019559227,0.0001868284,0.000055459488,4.7555366e-7,0.000336036,0.8715294,0.00023767716,0.11693519,0.0000069287485,0.010456833],"study_design_scores_gemma":[0.0032945352,0.0005142653,0.0000135697055,0.00027403276,0.00006522302,0.000015110112,0.00012196078,0.8702265,0.0010194298,0.124275014,0.0000072157995,0.00017312852],"about_ca_topic_score_codex":0.000002437278,"about_ca_topic_score_gemma":2.4195145e-7,"teacher_disagreement_score":0.54367214,"about_ca_system_score_codex":0.00009215767,"about_ca_system_score_gemma":0.00007819207,"threshold_uncertainty_score":0.85839826},"labels":[],"label_agreement":null},{"id":"W4409604920","doi":"10.61091/jcmcc127b-277","title":"A study of enhancement strategies for artificial intelligence-based automated design tools in complex design tasks","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Artificial intelligence; Systems engineering; Human–computer interaction; Engineering","score_opus":0.0665637075668588,"score_gpt":0.30627180399233733,"score_spread":0.23970809642547852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409604920","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26223877,0.000064279004,0.73237437,0.000017059027,0.004384133,0.00074917043,0.0000012412557,0.000058147965,0.00011281006],"genre_scores_gemma":[0.9798019,0.000004265351,0.02000442,0.0000044962812,0.00014922598,0.000017431377,0.0000011978292,0.000016620163,4.501807e-7],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977891,0.00013193331,0.0014501465,0.00013191973,0.0002968612,0.00020003732],"domain_scores_gemma":[0.9979785,0.0009488698,0.00045169823,0.00013556788,0.00043650632,0.000048849728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012934858,0.0002211155,0.00064416195,0.00037002386,0.00010313803,0.00019222371,0.00022275111,0.000121606485,0.0000037674065],"category_scores_gemma":[0.00017946807,0.0002090707,0.00008853727,0.00042476648,0.000049722938,0.00016433702,0.000029529625,0.00023780565,2.3933896e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046945325,0.0016980314,0.000029237422,0.0004791531,0.000237329,0.000006775748,0.0022603872,0.1394456,0.004535489,0.83974797,0.00022414896,0.010866407],"study_design_scores_gemma":[0.0019561078,0.0012998603,0.000027670685,0.00030038512,0.00007434892,0.0000036845895,0.0036515375,0.55571425,0.008803632,0.4279992,0.000013750596,0.00015558454],"about_ca_topic_score_codex":0.000005405731,"about_ca_topic_score_gemma":0.0000013269752,"teacher_disagreement_score":0.7175631,"about_ca_system_score_codex":0.00010970614,"about_ca_system_score_gemma":0.00022710237,"threshold_uncertainty_score":0.8525656},"labels":[],"label_agreement":null},{"id":"W4409718705","doi":"10.1139/cjce-2024-0525","title":"A decision support system for evaluating construction project recovery plans","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Decision support system; Computer science; Engineering; Construction engineering; Civil engineering; Operations research","score_opus":0.011555535386180277,"score_gpt":0.2275647429202217,"score_spread":0.2160092075340414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409718705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035683103,0.00052975916,0.9489179,0.000029321161,0.008712872,0.0002523687,0.0000506057,0.000092704024,0.005731354],"genre_scores_gemma":[0.9895665,0.000011674696,0.010135835,0.000009245113,0.00018508604,0.000016458276,0.0000048714815,0.000020950823,0.000049345603],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991928,0.000007877878,0.00042245095,0.00007612506,0.0000969266,0.00020382188],"domain_scores_gemma":[0.9994504,0.00008832908,0.000064312466,0.000087162574,0.00019113679,0.00011869974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031102978,0.00011652652,0.00018689393,0.0007004317,0.00007063475,0.00007153076,0.00009970424,0.000094516,0.000026164947],"category_scores_gemma":[0.00014971479,0.000121289195,0.00010347488,0.00025464574,0.000013180035,0.00019666558,0.0000022925058,0.00017207937,0.0000014422899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059055033,0.000003244981,0.0009228022,0.0008617588,0.00031706324,0.000029060222,0.00032872488,0.7674806,0.0043323003,0.012470855,0.0143998,0.19879474],"study_design_scores_gemma":[0.0029579026,0.00046408048,0.0014157977,0.004413849,0.00034244868,0.0025182536,0.0022625914,0.86926407,0.006918421,0.0014827157,0.10713415,0.0008257374],"about_ca_topic_score_codex":0.00008327909,"about_ca_topic_score_gemma":0.012676745,"teacher_disagreement_score":0.9538834,"about_ca_system_score_codex":0.00044382695,"about_ca_system_score_gemma":0.0006825388,"threshold_uncertainty_score":0.7073921},"labels":[],"label_agreement":null},{"id":"W4409729820","doi":"10.3390/app15094682","title":"An Integrated Planning and Control Framework (IPCF) for Construction Projects—Step 1: Development of the Construction Data Hub (CDH)","year":2025,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Construction engineering; Process management; Engineering","score_opus":0.025481000999450575,"score_gpt":0.2703481707676143,"score_spread":0.24486716976816372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409729820","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20125404,0.000117060976,0.7951231,0.00006356299,0.0009002309,0.0005013526,0.000026177118,0.00010632172,0.0019081621],"genre_scores_gemma":[0.8548954,0.0000027390108,0.14497434,0.00003135394,0.000027203567,0.00005009975,0.000010641544,0.0000039156153,0.000004265728],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922574,0.00001643994,0.0002575434,0.00024239422,0.00012616251,0.00013169523],"domain_scores_gemma":[0.99955034,0.00008976315,0.00007245314,0.00021197392,0.000053178483,0.000022292255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031383973,0.00010487648,0.00012976612,0.00010540524,0.0003552659,0.00008007639,0.00028985224,0.00009022261,0.000005633615],"category_scores_gemma":[0.000036087597,0.00007506745,0.0000117959635,0.00044223716,0.00051586365,0.00018845368,0.000027884418,0.000117425276,3.6235673e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047212096,0.000015276668,0.00980383,0.00011258578,0.00007230954,4.7844292e-8,0.0009207804,0.0021608963,0.04117448,0.30375275,0.00022442918,0.6417154],"study_design_scores_gemma":[0.0030100343,0.00018116331,0.017245296,0.0009857153,0.0002662116,0.00006427875,0.058830425,0.4417317,0.38443285,0.05724174,0.034846224,0.0011643703],"about_ca_topic_score_codex":0.000006081526,"about_ca_topic_score_gemma":0.000020902584,"teacher_disagreement_score":0.6536414,"about_ca_system_score_codex":0.000025751719,"about_ca_system_score_gemma":0.00016295676,"threshold_uncertainty_score":0.3061162},"labels":[],"label_agreement":null},{"id":"W4409787556","doi":"10.61091/jcmcc127a-361","title":"Optimized calculation of bearing capacity of short columns of steel-tube-concrete hybrid structures combined with genetic algorithm","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"West Anhui University; Anhui Provincial Department of Education; Anhui University","keywords":"Genetic algorithm; Bearing capacity; Structural engineering; Tube (container); Algorithm; Materials science; Bearing (navigation); Computer science; Engineering; Composite material; Mathematics; Mathematical optimization; Artificial intelligence","score_opus":0.007317211942678495,"score_gpt":0.21206953484547938,"score_spread":0.20475232290280088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787556","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92677325,0.00018532052,0.06791819,0.000005288701,0.0043130293,0.00025852103,0.0000074114296,0.000023491662,0.00051550847],"genre_scores_gemma":[0.9628499,0.000027355965,0.03694449,0.0000015434683,0.00014992894,0.0000015247738,0.0000020162297,0.000021792957,0.0000014601334],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976863,0.00006711398,0.0014400228,0.0001276659,0.00048268028,0.00019618311],"domain_scores_gemma":[0.99781394,0.0002962838,0.00074600504,0.00019969487,0.00086265744,0.00008141435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047214393,0.00023654998,0.00096744276,0.00028487935,0.00007921571,0.000041397234,0.0002056395,0.00013519608,0.0000046733153],"category_scores_gemma":[0.00010783208,0.00021275973,0.00015857523,0.00033551792,0.00016048962,0.00012592746,0.00005787709,0.0003159841,4.7188095e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083724514,0.00029263497,0.0030429058,0.0030535464,0.0018489403,0.000010862771,0.002521412,0.035151836,0.032637663,0.9029142,0.00009533432,0.017593415],"study_design_scores_gemma":[0.015089014,0.0023523795,0.004274376,0.002434205,0.00094910385,0.00013629328,0.0008587395,0.45867464,0.20514552,0.30934048,0.00006896333,0.0006762872],"about_ca_topic_score_codex":0.000026029513,"about_ca_topic_score_gemma":5.1316414e-7,"teacher_disagreement_score":0.59357375,"about_ca_system_score_codex":0.00007715313,"about_ca_system_score_gemma":0.00012741525,"threshold_uncertainty_score":0.867609},"labels":[],"label_agreement":null},{"id":"W4409787563","doi":"10.61091/jcmcc127a-406","title":"Intelligent Estimation of Construction Project Costs Based on Subtractive Clustering-based Self-Learning Convolutional Neural Network","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Convolutional neural network; Cluster analysis; Artificial intelligence; Estimation; Artificial neural network; Machine learning; Engineering; Systems engineering","score_opus":0.007968778674266588,"score_gpt":0.23875892288614595,"score_spread":0.23079014421187935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787563","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5036015,0.00020745618,0.46466437,0.00007771349,0.028231567,0.0005780509,0.0000037234138,0.00018926628,0.0024463444],"genre_scores_gemma":[0.9875299,0.000009281887,0.01201681,0.000012431837,0.00040292105,0.0000037019613,0.0000041743824,0.00001969735,0.0000011055021],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982175,0.00011938141,0.0009570016,0.00013570447,0.00036839666,0.00020199022],"domain_scores_gemma":[0.9979674,0.00071621913,0.0006377849,0.0001151281,0.00050268444,0.0000607465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072023796,0.00023350069,0.00048775505,0.00032579343,0.00018848585,0.00009548027,0.00013871377,0.00016939417,0.0000046935265],"category_scores_gemma":[0.00022221667,0.00022692796,0.00014399008,0.000421671,0.00008135226,0.00013497267,0.000028451552,0.0005647712,4.867449e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021206266,0.00020773729,0.000426266,0.00034746353,0.000121453144,0.0000024368292,0.00016473564,0.6473579,0.00011779332,0.34205934,0.00010343729,0.008879374],"study_design_scores_gemma":[0.0021759556,0.00048593566,0.00014375642,0.00074440514,0.00009869727,0.000020636146,0.00018972656,0.96569103,0.0012091822,0.028916907,0.00015533567,0.00016841908],"about_ca_topic_score_codex":0.00000552392,"about_ca_topic_score_gemma":7.50514e-7,"teacher_disagreement_score":0.48392838,"about_ca_system_score_codex":0.00021226678,"about_ca_system_score_gemma":0.00021570518,"threshold_uncertainty_score":0.9253854},"labels":[],"label_agreement":null},{"id":"W4409787762","doi":"10.61091/jcmcc127a-518","title":"Research on Civil Engineering Project Management Efficiency Improvement Based on BIM Technology","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Engineering management; Construction engineering; Project management; Systems engineering","score_opus":0.011632025372123198,"score_gpt":0.2684301973533815,"score_spread":0.25679817198125826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787762","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79959434,0.0005575415,0.097271,0.0005344703,0.05983566,0.0016928861,0.000003941953,0.0005206656,0.039989475],"genre_scores_gemma":[0.99791557,0.000023687462,0.0016652412,0.000013913858,0.0003347079,0.000010819476,4.8058365e-7,0.000024257713,0.0000113144215],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99815005,0.00003895825,0.00070180354,0.00017825085,0.000607358,0.00032360308],"domain_scores_gemma":[0.9988323,0.0003625312,0.0001635198,0.00024077564,0.00034197903,0.000058922014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012197027,0.00022692377,0.0003831129,0.0014548191,0.00020308969,0.00014692846,0.00030613694,0.00017190265,0.000003651377],"category_scores_gemma":[0.00011549048,0.0002025308,0.000093244,0.0010978454,0.00005643626,0.000058612455,0.000079970676,0.0007749811,0.0000022628706],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000481035,0.00028749442,0.000013910862,0.00035952224,0.00008085979,0.000010889373,0.00006476094,0.007467488,0.00044169684,0.983225,0.00045327414,0.0075470274],"study_design_scores_gemma":[0.007123987,0.0029386696,0.000053377502,0.0031697964,0.00010722479,0.000021902923,0.0011855111,0.508535,0.011072378,0.46004868,0.0052124974,0.000530966],"about_ca_topic_score_codex":0.0000012616348,"about_ca_topic_score_gemma":1.8309657e-7,"teacher_disagreement_score":0.5231763,"about_ca_system_score_codex":0.000235586,"about_ca_system_score_gemma":0.00007905199,"threshold_uncertainty_score":0.8258967},"labels":[],"label_agreement":null},{"id":"W4409795131","doi":"10.61091/jcmcc127b-412","title":"Green Building Performance Prediction and Evaluation System under BIM – based Digital Construction Technology","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Green building; Building information modeling; Architectural engineering; Construction engineering; Computer science; Systems engineering; Engineering; Operations management","score_opus":0.007209567207767159,"score_gpt":0.21998470863231998,"score_spread":0.2127751414245528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409795131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9166466,0.00033781645,0.06954342,0.00006594056,0.012224601,0.00020419665,0.000002228733,0.00012587011,0.0008493268],"genre_scores_gemma":[0.99662864,0.00001754416,0.0029663418,0.0000033496892,0.00036347142,0.0000035667865,0.0000014785894,0.000014494849,0.000001092149],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986741,0.000030701613,0.0006865214,0.00012530203,0.00033358438,0.00014979688],"domain_scores_gemma":[0.9989105,0.0001293363,0.00029552684,0.00011050399,0.00049895997,0.000055182583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063683453,0.00017542474,0.00033607084,0.00045451956,0.00020358444,0.000203422,0.00010350287,0.00019447463,0.000001624084],"category_scores_gemma":[0.000069639784,0.00016812759,0.00005210951,0.0004037159,0.000092346214,0.0003328311,0.00003912702,0.00031053083,3.6141958e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002989957,0.00004120601,0.0014250457,0.000476888,0.000100166435,9.135096e-7,0.000065492924,0.0020107224,0.0007375879,0.9493518,0.000020329964,0.04573998],"study_design_scores_gemma":[0.0032294898,0.00023151742,0.00038226292,0.0010225672,0.00017836485,0.00017998199,0.00086923456,0.7083191,0.002093092,0.28312227,0.00018682414,0.0001852756],"about_ca_topic_score_codex":0.0000013122326,"about_ca_topic_score_gemma":9.4400804e-8,"teacher_disagreement_score":0.70630836,"about_ca_system_score_codex":0.00019500633,"about_ca_system_score_gemma":0.000095697054,"threshold_uncertainty_score":0.6856044},"labels":[],"label_agreement":null},{"id":"W4409799836","doi":"10.11159/icsect25.139","title":"A Systematic Framework for the Seismic Risk Management of RC Bridges Using Hybrid Retrofit Strategies","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"United Arab Emirates University","keywords":"Computer science; Risk management; Construction engineering; Engineering; Business","score_opus":0.004962685979116521,"score_gpt":0.19800204617982986,"score_spread":0.19303936020071333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799836","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97856903,0.0021754696,0.016373761,0.000049364135,0.0014065149,0.0008919038,0.000073500705,0.00008194457,0.00037849107],"genre_scores_gemma":[0.9976395,0.00033744794,0.0018033128,0.000008972506,0.000024918443,0.000052925945,0.0000012529017,0.000020672021,0.00011099365],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919486,0.0000034059333,0.0003292037,0.00015454019,0.00015570318,0.00016231013],"domain_scores_gemma":[0.99958885,0.00010397165,0.00014163638,0.00013108805,0.000012441757,0.000022035494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009367683,0.00020279139,0.0002535606,0.00010131801,0.00013148498,0.00006435156,0.0002284105,0.00003980629,0.000005843641],"category_scores_gemma":[0.000012304231,0.00013609137,0.00010079783,0.00013913457,0.000101591286,0.00014201691,0.00006133355,0.0001837147,1.4695785e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009087178,0.000018195884,0.0032339327,0.0361376,0.0018335568,6.194531e-7,0.0003463403,0.63842785,0.014329267,0.30071428,0.00025906196,0.004608412],"study_design_scores_gemma":[0.0003943012,0.000026771333,0.0060599963,0.0072718426,0.00050227146,0.000014000795,0.0030456958,0.93589455,0.03905828,0.0073616994,0.000092804825,0.0002777636],"about_ca_topic_score_codex":0.0000070170486,"about_ca_topic_score_gemma":0.0000019158022,"teacher_disagreement_score":0.29746673,"about_ca_system_score_codex":0.000075338765,"about_ca_system_score_gemma":0.0000028460179,"threshold_uncertainty_score":0.55496454},"labels":[],"label_agreement":null},{"id":"W4409799975","doi":"10.11159/icsect25.134","title":"Towards A Multidisciplinary Framework to Improve the Quality of Structural Masonry in Developing Countries: Case Study of South Africa","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Multidisciplinary approach; Masonry; Quality (philosophy); Developing country; Computer science; Environmental planning; Engineering; Civil engineering; Geography; Economic growth; Economics; Sociology; Social science","score_opus":0.00935155598394076,"score_gpt":0.23872846358188118,"score_spread":0.22937690759794044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799975","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99834687,0.00019186361,0.00010432847,0.00007550813,0.00059718784,0.00049142446,0.000037332753,0.00002921606,0.00012625138],"genre_scores_gemma":[0.99906605,0.000015622325,0.00079689734,0.000011016562,0.000018016011,0.000039840317,6.2166964e-7,0.000016465203,0.00003546106],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99884254,0.000008618491,0.0005184423,0.0002120038,0.00022827572,0.0001901289],"domain_scores_gemma":[0.9995658,0.00008894985,0.0001349209,0.00015236241,0.000022939339,0.0000350512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001444964,0.00023012166,0.00032526976,0.00018781968,0.00009250736,0.000026449992,0.00024017462,0.000065590655,0.0000083457435],"category_scores_gemma":[0.00003593448,0.00015909824,0.00005867005,0.00035422682,0.000110281566,0.00012110636,0.00017330053,0.0002648958,1.0609275e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00094793824,0.00016542735,0.4278303,0.0063065975,0.0014487901,0.000022378008,0.10276075,0.23107977,0.10481889,0.10450167,0.00013453004,0.019982954],"study_design_scores_gemma":[0.0034390676,0.00041713266,0.6622899,0.0027554096,0.00024848513,0.000104242026,0.101463854,0.10881273,0.1154062,0.0033200867,0.00028355798,0.0014593168],"about_ca_topic_score_codex":0.000059122813,"about_ca_topic_score_gemma":0.00008916585,"teacher_disagreement_score":0.23445961,"about_ca_system_score_codex":0.00010789802,"about_ca_system_score_gemma":0.000009681933,"threshold_uncertainty_score":0.6487838},"labels":[],"label_agreement":null},{"id":"W4409799976","doi":"10.11159/icsect25.111","title":"Social Housing: Critical Evaluation of Prestress Losses in Precast Slabs","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Structural engineering; Computer science; Engineering; Geotechnical engineering","score_opus":0.009556308984183666,"score_gpt":0.23382103467522888,"score_spread":0.22426472569104522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799976","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9962679,0.0003577121,0.000011409607,0.00008032907,0.00054506527,0.0001843936,0.000013643743,0.0000345501,0.002505002],"genre_scores_gemma":[0.9997256,0.00002944562,0.00009679748,0.0000058218943,0.000029592711,0.000022176682,0.0000017678018,0.000013528893,0.000075260235],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920094,0.0000053011677,0.00025903978,0.00014510863,0.00024741143,0.00014222816],"domain_scores_gemma":[0.9998109,0.000039341165,0.000047854417,0.000056637233,0.000023570774,0.000021716574],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000095861564,0.00015284796,0.00017653158,0.00017301065,0.00005494895,0.00002798006,0.00012324679,0.000060001796,0.00003323071],"category_scores_gemma":[0.00003642429,0.00013238269,0.00004561046,0.00019094363,0.00013984807,0.00017222534,0.000047000663,0.00017003948,1.9769689e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025526874,0.00011473681,0.119393624,0.004092316,0.0004794703,0.0000011997978,0.001579482,0.17838262,0.44197384,0.16061394,0.0017266899,0.09138682],"study_design_scores_gemma":[0.0015422247,0.00004754988,0.17965218,0.001337337,0.00023043565,0.000009850777,0.0006315335,0.47847402,0.33347312,0.0035127746,0.0005581678,0.000530809],"about_ca_topic_score_codex":0.000006376109,"about_ca_topic_score_gemma":0.000021948828,"teacher_disagreement_score":0.3000914,"about_ca_system_score_codex":0.000092917995,"about_ca_system_score_gemma":0.0000064046153,"threshold_uncertainty_score":0.53984094},"labels":[],"label_agreement":null},{"id":"W4409799991","doi":"10.11159/icsect25.162","title":"Impact of Errors and Omissions in Concrete Slab Penetrations in Construction Projects","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Slab; Computer science; Engineering; Construction engineering; Structural engineering","score_opus":0.0046064211687044665,"score_gpt":0.20419453885986966,"score_spread":0.1995881176911652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799991","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984245,0.00020865155,0.000007789639,0.000032277905,0.0002607355,0.0002093665,0.000016824668,0.000023424493,0.0008164379],"genre_scores_gemma":[0.99947697,0.00011994173,0.000302921,0.0000031432758,0.000007608386,0.000016289538,0.0000021846042,0.000010188365,0.000060729628],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993653,0.0000032701405,0.00026824276,0.00014317497,0.00008699191,0.00013298033],"domain_scores_gemma":[0.9998168,0.000029163211,0.000056881257,0.000058683032,0.000007607631,0.000030916563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000044728346,0.00015631069,0.00019184186,0.0003189531,0.000039730974,0.000019100751,0.00007828569,0.000057155168,0.000014574358],"category_scores_gemma":[0.000016441712,0.00012557385,0.00004236887,0.00028367576,0.00012566475,0.00017703883,0.00003520485,0.0001954134,7.383221e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007924197,0.000010542945,0.52821094,0.00047623465,0.00011929507,5.841474e-7,0.00049366994,0.032190662,0.40801364,0.02433652,0.00010184702,0.0059668217],"study_design_scores_gemma":[0.0011872168,0.00006220288,0.81176114,0.0008578142,0.000034284454,0.000025518473,0.0007783696,0.12742183,0.056758933,0.0007443271,0.00006695261,0.00030141196],"about_ca_topic_score_codex":0.000028738137,"about_ca_topic_score_gemma":0.000059877624,"teacher_disagreement_score":0.35125473,"about_ca_system_score_codex":0.0000955266,"about_ca_system_score_gemma":0.000008934264,"threshold_uncertainty_score":0.5120753},"labels":[],"label_agreement":null},{"id":"W4409800006","doi":"10.11159/csee25","title":"Proceedings of the 10th World Congress on Civil, Structural, and Environmental Engineering","year":2025,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"New Jersey Department of Transportation; U.S. Department of Transportation","keywords":"Computer science; Engineering; Political science","score_opus":0.004222973071937359,"score_gpt":0.18015953047383604,"score_spread":0.17593655740189867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409800006","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97358084,0.0026571262,0.0000056973217,0.00016250301,0.010044552,0.001490125,0.0010000838,0.00019727625,0.010861776],"genre_scores_gemma":[0.979107,0.00095110264,0.00015586668,0.000053862015,0.0002727826,0.00009203802,0.000047556234,0.00015752242,0.019162236],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9968583,0.0000074301806,0.0009253185,0.00080495595,0.00074175315,0.00066224806],"domain_scores_gemma":[0.99886465,0.000115553514,0.0004916668,0.00031070714,0.000029940105,0.00018745956],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000119691074,0.0011775799,0.0009941978,0.0006273088,0.0002985514,0.00021054674,0.00083780417,0.00036097318,0.00036341464],"category_scores_gemma":[0.000028638491,0.000889794,0.0003169236,0.00048765013,0.0004883005,0.0004311668,0.0004580106,0.0013940937,0.000007797667],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00076666137,0.00019418776,0.02056341,0.018666906,0.0044404874,0.0000068812774,0.0016119955,0.17271796,0.5967098,0.031949546,0.13598976,0.016382424],"study_design_scores_gemma":[0.0054160203,0.0005311596,0.04640032,0.017074507,0.0015148589,0.00032826478,0.0018933469,0.17482013,0.5999487,0.0006023778,0.14500378,0.0064665414],"about_ca_topic_score_codex":0.0000138624455,"about_ca_topic_score_gemma":0.000022935059,"teacher_disagreement_score":0.03134717,"about_ca_system_score_codex":0.00037013186,"about_ca_system_score_gemma":0.00001599181,"threshold_uncertainty_score":0.99935526},"labels":[],"label_agreement":null},{"id":"W4409839744","doi":"10.1016/j.engstruct.2025.120438","title":"Performance-based seismic design method of stacked modular steel building based on three-dimensional seismic isolation","year":2025,"lang":"en","type":"article","venue":"Engineering Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Seismic isolation; Structural engineering; Seismic analysis; Modular design; Modular construction; Seismic retrofit; Computer science; Geology; Engineering; Seismology; Reinforced concrete","score_opus":0.007498042350918382,"score_gpt":0.21600015858787688,"score_spread":0.2085021162369585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409839744","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2172684,0.000074290496,0.7814193,0.00003274928,0.0006694956,0.00017380207,0.000010366261,0.00027643456,0.0000751787],"genre_scores_gemma":[0.8011197,0.000001217561,0.19869311,0.000064656415,0.000044491688,0.000020623484,0.00001530375,0.000029479843,0.000011406135],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989985,0.000030438676,0.00031814206,0.00021315788,0.00022295788,0.00021678183],"domain_scores_gemma":[0.9994228,0.00015902318,0.00004962789,0.0002555393,0.00007236039,0.000040675346],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000167024,0.00025798305,0.0002411208,0.0004640438,0.000068075344,0.000026029502,0.000130187,0.00015477602,0.000035046753],"category_scores_gemma":[0.000032701653,0.0002548421,0.000086094704,0.0003663541,0.000021273974,0.00010388553,0.000009454067,0.0002664245,0.0000014766305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036775447,0.000005047712,0.00010099365,0.00015833056,0.000041378862,5.109807e-7,0.000012385959,0.9470448,0.041886877,0.0011995664,0.00009996686,0.009413352],"study_design_scores_gemma":[0.00043355406,0.000042179403,0.0042595137,0.00014676522,0.000028913262,0.0000019519296,0.0000031939132,0.8622929,0.13202895,0.00035564156,0.0002229976,0.00018343778],"about_ca_topic_score_codex":0.000010321463,"about_ca_topic_score_gemma":4.2430514e-7,"teacher_disagreement_score":0.5838513,"about_ca_system_score_codex":0.0001240189,"about_ca_system_score_gemma":0.00006740182,"threshold_uncertainty_score":0.9999904},"labels":[],"label_agreement":null},{"id":"W4409875585","doi":"10.1016/j.resconrec.2025.108331","title":"Assembly restoration framework for modelling circular building strategies","year":2025,"lang":"en","type":"article","venue":"Resources Conservation and Recycling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Circular economy; Engineering; Environmental science; Construction engineering; Architectural engineering; Waste management; Business; Environmental resource management; Civil engineering; Environmental planning; Ecology; Biology","score_opus":0.020633865811075174,"score_gpt":0.25936012135992653,"score_spread":0.23872625554885135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409875585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37719977,0.0007894124,0.6203398,0.00028858852,0.0002819846,0.00011572682,0.0000013070166,0.00016400956,0.0008194056],"genre_scores_gemma":[0.95128006,0.00019329342,0.048107132,0.00015785795,0.000114270646,0.000041972537,0.000010153386,0.000014207008,0.000081071616],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937737,0.000021348706,0.0002531696,0.00015239509,0.000073114665,0.00012259341],"domain_scores_gemma":[0.99956155,0.00018843827,0.00004515825,0.00009638335,0.00008130901,0.000027169193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017907524,0.00010706583,0.00011967118,0.00015136319,0.00022473813,0.00020996429,0.000049195587,0.00015538136,0.000002842524],"category_scores_gemma":[0.00004792642,0.00011065763,0.00004073917,0.00020202252,0.000029993962,0.00023628595,0.000006906911,0.00013596377,6.628428e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003113423,0.00000778724,0.0015193981,0.00035229104,0.00007711652,3.7457565e-7,0.0007802573,0.31765637,0.014906247,0.6302676,0.00024274687,0.034158662],"study_design_scores_gemma":[0.00018203395,0.0000088555225,0.00031571803,0.00024668482,0.000025261208,0.0000017856545,0.0011192679,0.9064516,0.0020204214,0.062251847,0.027242733,0.00013381912],"about_ca_topic_score_codex":0.000018621635,"about_ca_topic_score_gemma":0.000008403522,"teacher_disagreement_score":0.5887952,"about_ca_system_score_codex":0.00003378764,"about_ca_system_score_gemma":0.00002424924,"threshold_uncertainty_score":0.4512487},"labels":[],"label_agreement":null},{"id":"W4409950976","doi":"10.1016/b978-0-443-29861-5.00027-5","title":"Robotic construction and inspection: automation and efficiency in the building process","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Automation; Process (computing); Process automation system; Computer science; Manufacturing engineering; Engineering; Architectural engineering; Construction engineering; Mechanical engineering; Operating system","score_opus":0.0060905111345767255,"score_gpt":0.21188692504882006,"score_spread":0.20579641391424333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409950976","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023018918,0.00146563,0.0013750794,0.000051552735,0.0006064908,0.00039300194,0.000002847602,0.00022726666,0.9935762],"genre_scores_gemma":[0.7481736,0.0011323543,0.0033286447,0.00021507392,0.00071755017,0.00025277096,0.000029528575,0.000113646056,0.24603686],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934757,0.000012728065,0.00024437526,0.00018364584,0.00011845907,0.000093247014],"domain_scores_gemma":[0.9997425,0.00003272347,0.000053562857,0.00011364496,0.000038242193,0.000019339997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011024167,0.000181319,0.00017230361,0.00021192011,0.00010964242,0.00007841786,0.00005831708,0.00018104452,0.0000089893465],"category_scores_gemma":[0.0000078556795,0.00015200207,0.000026410327,0.000034707627,0.00012115804,0.000070330396,0.000010966442,0.00031862588,0.000001718234],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000015541905,9.188758e-7,0.000028046907,0.00017725625,0.000012712245,0.0000011140028,0.0003478946,0.00017280322,0.000018594146,0.06321197,0.000011348525,0.9360158],"study_design_scores_gemma":[0.0027057596,0.00027165844,0.0029501547,0.008121903,0.0008896192,0.0025311988,0.002455864,0.1613513,0.0008583046,0.31680802,0.49777463,0.0032815973],"about_ca_topic_score_codex":4.8641635e-7,"about_ca_topic_score_gemma":0.000021113896,"teacher_disagreement_score":0.9327342,"about_ca_system_score_codex":0.00005394412,"about_ca_system_score_gemma":0.000028611163,"threshold_uncertainty_score":0.61984646},"labels":[],"label_agreement":null},{"id":"W4409978586","doi":"10.1016/j.autcon.2025.106198","title":"Simulation as a decision-support tool in construction project management: Simphony-Dynamic-as-a-Service","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Decision support system; Service (business); Construction management; Engineering; Engineering management; Process management; Project management; Computer science; Construction engineering; Systems engineering; Operations research; Operations management; Business; Civil engineering; Artificial intelligence","score_opus":0.005636206337668867,"score_gpt":0.2614255933201834,"score_spread":0.2557893869825145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409978586","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81656206,0.000099052726,0.14211056,0.00016186075,0.0038352222,0.0014703985,0.000015060089,0.0010701821,0.034675628],"genre_scores_gemma":[0.9820071,0.00013410195,0.017180432,0.00013129505,0.00003868751,0.00024193163,0.00009516309,0.000028272316,0.00014304214],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978817,0.000076645774,0.00097200996,0.00043394158,0.00033183148,0.00030386142],"domain_scores_gemma":[0.99912846,0.00018481475,0.00014309683,0.0003372605,0.00017688112,0.000029479721],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00028505042,0.0002938442,0.000281304,0.0016529136,0.000120392295,0.00014293242,0.0001551445,0.0003181335,0.0002553097],"category_scores_gemma":[0.000107070766,0.00034721574,0.000071944196,0.0023619607,0.000086265325,0.0009724014,0.000037264857,0.00031636225,0.00017571442],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009523003,0.00003627137,0.0038638187,0.00021154179,0.00005333596,0.000008426242,0.0003987186,0.22185975,0.00037033402,0.062175024,0.0001591873,0.71076834],"study_design_scores_gemma":[0.0020495637,0.00003221214,0.013443446,0.0004093361,0.000040647858,0.00009920778,0.0028446303,0.9314694,0.0005543953,0.044009067,0.004630563,0.00041757166],"about_ca_topic_score_codex":0.00014936875,"about_ca_topic_score_gemma":0.00040181272,"teacher_disagreement_score":0.7103508,"about_ca_system_score_codex":0.0006535224,"about_ca_system_score_gemma":0.00014956719,"threshold_uncertainty_score":0.99989796},"labels":[],"label_agreement":null},{"id":"W4410106010","doi":"10.1016/j.aei.2025.103367","title":"Integrated fuzzy system dynamics–fuzzy agent-based modeling of construction crew motivation and productivity","year":2025,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Canada First Research Excellence Fund; University of Alberta","keywords":"Crew; Productivity; Fuzzy logic; Computer science; Engineering; Artificial intelligence; Aeronautics; Economics","score_opus":0.004842735871657765,"score_gpt":0.18137791623529667,"score_spread":0.1765351803636389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410106010","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28476322,0.00007702616,0.7119626,0.000008328685,0.00060753373,0.00016963905,0.000014555496,0.00040763954,0.0019894561],"genre_scores_gemma":[0.94050545,0.000019233665,0.059359528,0.0000042218153,0.000014194781,0.000026168653,0.0000471684,0.000015241867,0.000008823032],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911994,0.000006867277,0.00052291114,0.000085698244,0.0001123755,0.00015218699],"domain_scores_gemma":[0.99951786,0.00003425918,0.00007483991,0.00018247038,0.0001552823,0.00003528206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009867367,0.00018184738,0.00021907451,0.00030163582,0.00004745716,0.000029176383,0.00006446952,0.00010196189,9.083641e-7],"category_scores_gemma":[0.000056919675,0.00019121634,0.000037253732,0.00043029594,0.000032691984,0.00046407193,0.000012607605,0.00018979654,0.0000010136029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000071334157,0.0000038355142,0.00020652394,0.0010961416,0.00003148699,9.702666e-8,0.00009180463,0.92740184,0.0010121451,0.032019857,0.0000035935739,0.03812553],"study_design_scores_gemma":[0.00031239676,0.000012906083,0.0001413772,0.00041676342,0.000024216439,0.0000072901553,0.0008306899,0.9940238,0.003822431,0.0001558479,0.00010341765,0.00014887146],"about_ca_topic_score_codex":0.000006884736,"about_ca_topic_score_gemma":0.000004364718,"teacher_disagreement_score":0.65574217,"about_ca_system_score_codex":0.00024280192,"about_ca_system_score_gemma":0.00003270656,"threshold_uncertainty_score":0.7797576},"labels":[],"label_agreement":null},{"id":"W4410425913","doi":"10.70803/001c.138281","title":"Development of Self-Reinforced Concrete Block for Improved Shear Wall Ductility","year":2017,"lang":"en","type":"article","venue":"The Masonry Society Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Shear wall; Ductility (Earth science); Reinforced concrete; Materials science; Block (permutation group theory); Structural engineering; Shear (geology); Composite material; Engineering; Geometry; Mathematics; Creep","score_opus":0.014075215373346469,"score_gpt":0.2279919645266933,"score_spread":0.21391674915334682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410425913","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9749342,0.00020097953,0.020218143,0.0008531258,0.0013432095,0.0003257387,0.0000090845615,0.0001248432,0.0019906787],"genre_scores_gemma":[0.9315061,0.00011732513,0.06734744,0.00007289856,0.00033534787,0.000017357002,0.0000025065158,0.000021367747,0.000579638],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993882,0.00000943984,0.00027594678,0.00006315018,0.00010110523,0.00016214774],"domain_scores_gemma":[0.9994231,0.000025486099,0.00015685763,0.00021611394,0.0001282911,0.000050193954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046908573,0.00009886189,0.00012957572,0.0000076646265,0.00069746654,0.000099920566,0.0002517215,0.00007755801,0.000031626507],"category_scores_gemma":[0.000020685142,0.00007035227,0.00018371193,0.00001853186,0.00007256014,0.00015291963,0.00002245938,0.00023307449,0.0000025881855],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032673616,0.000020877822,0.0010755647,0.0007731459,0.004826314,0.0000012283925,0.06494626,0.0050343135,0.6417833,0.0077283373,0.047083937,0.22639996],"study_design_scores_gemma":[0.0034054094,0.00011025234,0.0062300977,0.00011866529,0.00022976377,0.00026662735,0.0049801003,0.62603235,0.14502473,0.0006282586,0.21230944,0.0006642985],"about_ca_topic_score_codex":0.0000019969061,"about_ca_topic_score_gemma":0.0000013711775,"teacher_disagreement_score":0.6209981,"about_ca_system_score_codex":0.00007659408,"about_ca_system_score_gemma":0.00008202115,"threshold_uncertainty_score":0.5364419},"labels":[],"label_agreement":null},{"id":"W4410505931","doi":"10.3390/buildings15101709","title":"Efficiency of Modular Bridge Configurations: A Study on the Structural Stability and Capacity of Single- and Double-Story Modular Bridges","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"Ontario Ministry of Economic Development, Job Creation and Trade; Ministero dello Sviluppo Economico; Ontario Centre of Innovation","keywords":"Modular design; Bridge (graph theory); Structural engineering; Modular construction; Engineering; Computer science; Programming language; Medicine","score_opus":0.02508002053685749,"score_gpt":0.2282832931495231,"score_spread":0.2032032726126656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410505931","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9957725,0.00026796717,0.00303957,0.000093112205,0.00013572753,0.00034096613,0.000016658401,0.00003989674,0.0002936114],"genre_scores_gemma":[0.99986756,0.0000063305415,0.000081291306,0.00001031982,0.00000961351,0.000012948319,9.092609e-7,0.0000050848867,0.0000059216254],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994158,0.00003723992,0.00020851941,0.0001458958,0.00011322248,0.00007931488],"domain_scores_gemma":[0.9995876,0.000077795085,0.000048588878,0.00017847386,0.00008886528,0.000018692715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019718277,0.000100738536,0.00015466611,0.000074088275,0.00008450672,0.000022203007,0.000068222245,0.00004323166,0.000008347717],"category_scores_gemma":[0.000049178285,0.000078131256,0.000026185135,0.00013571056,0.0001901054,0.00008040725,0.00001664195,0.00011322805,1.1274807e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008758168,0.0001273121,0.030846667,0.0002756182,0.00013452434,4.4005859e-7,0.005016464,0.0024412074,0.86815745,0.08623298,0.00007433153,0.006605438],"study_design_scores_gemma":[0.0013148263,0.00026195124,0.47426185,0.00012489132,0.00008501823,0.0000074358895,0.0035228995,0.027358677,0.49083883,0.0018210819,0.00017163127,0.00023089419],"about_ca_topic_score_codex":0.00013006676,"about_ca_topic_score_gemma":0.000019985871,"teacher_disagreement_score":0.4434152,"about_ca_system_score_codex":0.000033595225,"about_ca_system_score_gemma":0.000013251375,"threshold_uncertainty_score":0.31861},"labels":[],"label_agreement":null},{"id":"W4410777652","doi":"10.3390/buildings15111840","title":"A Novel Framework for Natural Language Interaction with 4D BIM","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Natural (archaeology); Human–computer interaction; Building information modeling; Computer science; Systems engineering; Engineering; Architectural engineering; Geography; Operations management","score_opus":0.005064747679159862,"score_gpt":0.24341659454646988,"score_spread":0.23835184686731004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410777652","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17555836,0.00018284233,0.82211626,0.00015057425,0.0008395468,0.000096811644,0.0000036779963,0.00019795218,0.0008539976],"genre_scores_gemma":[0.9109761,0.000002566356,0.08861409,0.000110156296,0.00008468258,0.000039361712,0.000005287526,0.000009165369,0.00015856391],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99972665,0.0000013632887,0.000072053816,0.00008028224,0.00003771493,0.00008191352],"domain_scores_gemma":[0.9998369,0.000038764407,0.000013863154,0.00006739511,0.00003104637,0.000012015516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000022076654,0.00006596688,0.00005935778,0.00007413457,0.000044521028,0.000052884934,0.000043018743,0.000052523144,0.000015957929],"category_scores_gemma":[0.000022832191,0.000055647957,0.000027245433,0.00014028963,0.000014498843,0.00010070409,0.00000460616,0.00012771467,0.0000023110645],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007100919,0.000013710988,0.00023711727,0.00009820116,0.00008314665,4.9465757e-7,0.0003909317,0.0011284656,0.0423536,0.8228533,0.001412991,0.131357],"study_design_scores_gemma":[0.0035584036,0.00021947993,0.0036961467,0.0021276453,0.00024129135,0.00016242241,0.008208269,0.31700218,0.38260746,0.035780728,0.24505194,0.0013440455],"about_ca_topic_score_codex":0.000019706955,"about_ca_topic_score_gemma":0.000021358377,"teacher_disagreement_score":0.7870726,"about_ca_system_score_codex":0.00004496084,"about_ca_system_score_gemma":0.000010267512,"threshold_uncertainty_score":0.22692579},"labels":[],"label_agreement":null},{"id":"W4410873454","doi":"10.1080/13467581.2025.2507235","title":"Drivers for adopting augmented reality and virtual reality technologies in the construction project management in Gaza City","year":2025,"lang":"en","type":"article","venue":"Journal of Asian Architecture and Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Augmented reality; Virtual reality; Artificial reality; Architectural engineering; Engineering; Mixed reality; Computer-mediated reality; Computer science; Human–computer interaction","score_opus":0.008672896215308338,"score_gpt":0.24038732921379338,"score_spread":0.23171443299848504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410873454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6257143,0.00036812757,0.37198478,0.0008638807,0.0002848942,0.00032409892,0.0000042282,0.0000882535,0.00036743656],"genre_scores_gemma":[0.9806346,0.00014537314,0.01916829,0.0000073853907,0.000025382595,0.000010849971,6.917829e-7,0.0000049432397,0.0000024299209],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994408,0.000015891368,0.0002626693,0.00008731078,0.00007344994,0.00011990625],"domain_scores_gemma":[0.99980414,0.000055423363,0.000048900984,0.000064042535,0.000017035622,0.000010471557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033083442,0.00009940393,0.00014409251,0.00045907262,0.00003616141,0.000039404196,0.00007590165,0.00006468875,1.8843282e-7],"category_scores_gemma":[0.00004296499,0.00007621978,0.000031663152,0.0002858078,0.000035076268,0.0000808289,0.000017823908,0.00031556413,6.0480985e-9],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082751605,0.000019170022,0.0048576253,0.0005306445,0.000142044,0.000017416047,0.001549636,0.09445044,0.0054955226,0.017319528,0.00013923696,0.875396],"study_design_scores_gemma":[0.015965283,0.0011857118,0.35854903,0.011372808,0.0007281417,0.0022520702,0.09576858,0.36943176,0.028311916,0.04358098,0.07017188,0.002681828],"about_ca_topic_score_codex":0.0000052298033,"about_ca_topic_score_gemma":0.000023282331,"teacher_disagreement_score":0.87271416,"about_ca_system_score_codex":0.00006354809,"about_ca_system_score_gemma":0.000009531716,"threshold_uncertainty_score":0.31081527},"labels":[],"label_agreement":null},{"id":"W4410894318","doi":"10.61552/jemit.2025.02.006","title":"CANADIAN BUILDING MAINTENANCE CODES AND STANDARDS WITH EXAMPLE CITY OF CALGARY","year":2025,"lang":"en","type":"article","venue":"Journal of Engineering Management and Information Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Computer science; Engineering","score_opus":0.0019920743378795706,"score_gpt":0.16634625018524712,"score_spread":0.16435417584736756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410894318","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24430993,0.00047541468,0.74836177,0.0002142493,0.0001983351,0.00009659956,0.0000050310723,0.00006682751,0.0062718447],"genre_scores_gemma":[0.9864667,0.00042397514,0.0130684925,0.000015687834,0.00000386361,0.0000024641877,6.573887e-7,0.000002325356,0.000015824515],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99961346,0.0000012085102,0.00021000527,0.000023199593,0.000076534394,0.00007561266],"domain_scores_gemma":[0.99974203,0.0000059000067,0.000049851158,0.00004474352,0.0001341479,0.000023314904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013553437,0.00005574678,0.00010023807,0.00079148647,0.000022133767,0.000018687413,0.000046364243,0.00004732139,0.000003634587],"category_scores_gemma":[0.0000145551685,0.000047605423,0.000009123926,0.00022449679,0.000024140472,0.00038970014,0.000011124506,0.00009780688,5.2746433e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023481527,0.0000031551385,0.0048814653,0.00060335774,0.00023938586,0.000003805619,0.00012677572,0.010150943,0.00030819373,0.73824066,0.0010586043,0.24436016],"study_design_scores_gemma":[0.0033815317,0.00042439418,0.04495939,0.0018592218,0.00021706239,0.00033144714,0.0023151906,0.18349713,0.014018071,0.0073585417,0.74103177,0.0006062808],"about_ca_topic_score_codex":0.0001378048,"about_ca_topic_score_gemma":0.00017841879,"teacher_disagreement_score":0.74215674,"about_ca_system_score_codex":0.0000952325,"about_ca_system_score_gemma":0.000022334127,"threshold_uncertainty_score":0.19412927},"labels":[],"label_agreement":null},{"id":"W4410898050","doi":"10.1007/978-3-031-93835-1_11","title":"An Interactive Multi-modal Online Platform for Supporting Data-Informed Design Discourse on Developing Built Environments","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Modal; Human–computer interaction; Multimedia","score_opus":0.05048053514571442,"score_gpt":0.32552666475675235,"score_spread":0.2750461296110379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410898050","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00029132512,0.000024340618,0.9972389,0.00006023094,0.0014983254,0.00048539953,0.000120499164,0.00009198262,0.00018904515],"genre_scores_gemma":[0.13336085,0.000031030308,0.8650811,0.00037269355,0.0003932292,0.000025431667,0.00051660807,0.000042923344,0.00017616343],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983792,0.000005834047,0.00041734878,0.0005994594,0.00026734316,0.00033084486],"domain_scores_gemma":[0.9988668,0.00031613276,0.00013496193,0.0005763229,0.000041531417,0.00006423772],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00024289613,0.00033818846,0.00027087214,0.00039445955,0.00012679059,0.00014468587,0.0008662585,0.00020322757,0.000011157313],"category_scores_gemma":[0.00008010238,0.00030676235,0.000043594096,0.00010466619,0.00017898208,0.00072454807,0.00016234005,0.00046863052,0.0000042960187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020897407,0.000015075199,0.000009157335,0.000038658516,0.000022460867,0.0000031887496,0.000311889,0.15232046,0.00024745965,0.0012956876,0.000016494561,0.8456986],"study_design_scores_gemma":[0.00028506856,0.00008643056,0.00006775614,0.00044773403,0.000013686639,0.000008797548,0.0000043023947,0.9899392,0.004142331,0.0037432467,0.0009016442,0.000359819],"about_ca_topic_score_codex":0.000006634806,"about_ca_topic_score_gemma":0.00017354533,"teacher_disagreement_score":0.84533876,"about_ca_system_score_codex":0.00046145276,"about_ca_system_score_gemma":0.00031365096,"threshold_uncertainty_score":0.9999384},"labels":[],"label_agreement":null},{"id":"W4411023145","doi":"10.1007/978-981-96-5654-7_10","title":"Towards Net Positive Responses to Spatial Challenges in Architecture Programs","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College; Sheridan College","funders":"","keywords":"Architecture; Net (polyhedron); Computer architecture; Computer science; Geography; Mathematics; Archaeology","score_opus":0.011847741589621898,"score_gpt":0.21146376016529864,"score_spread":0.19961601857567673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411023145","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008367247,0.021247497,0.7596671,0.001733611,0.0038162442,0.0019840053,0.00015696944,0.0014954517,0.20906241],"genre_scores_gemma":[0.9868574,0.0014348193,0.007736931,0.00013790552,0.0009803498,0.00028667232,0.0001414517,0.00028053555,0.002143928],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99851614,0.000016182963,0.00040600533,0.0004437839,0.00022553158,0.0003923488],"domain_scores_gemma":[0.9993478,0.0001790655,0.000033272914,0.00031069407,0.000046910816,0.00008225659],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000116366435,0.0005680553,0.0005128803,0.0010192273,0.000019898534,0.00004964289,0.00021257237,0.0006900533,0.000063188214],"category_scores_gemma":[0.00012794333,0.00060118514,0.00011978494,0.0001798841,0.00002336898,0.00004819751,0.00005586944,0.0012593146,0.000008994427],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048778304,0.0000073028004,0.000020905822,0.00030613595,0.00006268868,0.000044990466,0.00080114393,0.27835926,0.00020890514,0.006018801,0.000018175133,0.7141029],"study_design_scores_gemma":[0.004827006,0.0016596449,0.009484598,0.043477736,0.00044692936,0.000605181,0.0001059746,0.26526466,0.017911332,0.092924036,0.55023885,0.013054053],"about_ca_topic_score_codex":0.000072306626,"about_ca_topic_score_gemma":0.009417159,"teacher_disagreement_score":0.9860207,"about_ca_system_score_codex":0.00034493074,"about_ca_system_score_gemma":0.00006577147,"threshold_uncertainty_score":0.999644},"labels":[],"label_agreement":null},{"id":"W4411024025","doi":"10.1080/15623599.2025.2506804","title":"A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: a case study in building renovation","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Decision support system; Supply chain management; Process management; Supply chain; Project management; Engineering management; Systems engineering; Business; Operations management; Computer science; Operations research; Engineering","score_opus":0.017926777153482842,"score_gpt":0.2969953613591759,"score_spread":0.2790685842056931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411024025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49826312,0.000018867482,0.49791127,0.00004231208,0.0018931614,0.0011538117,0.000008328392,0.0000400215,0.0006691027],"genre_scores_gemma":[0.77726555,0.000050137278,0.22231992,0.000020808367,0.00007299545,0.00019665933,0.000004318389,0.000013095199,0.000056533678],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981647,0.000027265247,0.0010058637,0.00023807703,0.0003951975,0.0001688546],"domain_scores_gemma":[0.9990497,0.00013385154,0.00020623514,0.000132524,0.00044068307,0.000036987243],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007263187,0.00019416779,0.0002466377,0.0023647437,0.000108740816,0.00018475868,0.0002155128,0.00005604013,0.000004172635],"category_scores_gemma":[0.00006232053,0.00018216211,0.00007461238,0.0006227499,0.000025784395,0.0003873496,0.00009236774,0.00017376458,6.2631847e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006491123,0.00015659195,0.00972816,0.00020645994,0.0006969066,0.0002965071,0.0009418878,0.03403804,0.00066151447,0.012413541,0.00059133366,0.93961996],"study_design_scores_gemma":[0.029127674,0.001216056,0.022948962,0.007867353,0.0006704192,0.017278584,0.20957294,0.69164574,0.0021470634,0.0008862757,0.015405316,0.0012335936],"about_ca_topic_score_codex":0.00004499531,"about_ca_topic_score_gemma":0.00010968713,"teacher_disagreement_score":0.9383863,"about_ca_system_score_codex":0.00054833706,"about_ca_system_score_gemma":0.000049095874,"threshold_uncertainty_score":0.7428355},"labels":[],"label_agreement":null},{"id":"W4411144986","doi":"10.1108/jm2-05-2024-0156","title":"Advanced planning with supplier selection for modular construction supply chain performance improvement","year":2025,"lang":"en","type":"article","venue":"Journal of Modelling in Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Modular design; Process management; Supply chain; Supply chain management; Business; Selection (genetic algorithm); Supplier relationship management; Operations management; Computer science; Knowledge management; Marketing; Economics; Artificial intelligence","score_opus":0.00533635239150015,"score_gpt":0.19983303221453091,"score_spread":0.19449667982303076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411144986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35808352,0.000086377164,0.64081234,0.000036287995,0.00032352709,0.00018664096,5.555059e-7,0.000018375971,0.0004523575],"genre_scores_gemma":[0.92830455,0.00020997509,0.07124414,0.00001623551,0.000040351963,0.000040095576,0.0000022157528,0.000010505629,0.00013191026],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928343,0.000004662219,0.0003542133,0.00009250419,0.00012873465,0.00013644296],"domain_scores_gemma":[0.99973404,0.0000103039765,0.00009201403,0.000059466412,0.00008567341,0.000018513616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020570478,0.000101689984,0.00013399402,0.0003538296,0.000052735628,0.000029470986,0.000064470376,0.000039133898,0.000004681851],"category_scores_gemma":[9.929926e-7,0.00009156049,0.000036297617,0.00019515112,0.000013458493,0.0002044676,0.00000575465,0.00014834611,3.0766222e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013125988,0.000011277287,0.0011938463,0.00018843396,0.00007253041,7.861266e-7,0.000064733096,0.9257935,0.0006547369,0.002818104,0.000055594508,0.06901519],"study_design_scores_gemma":[0.001101765,0.00013560173,0.00029043018,0.0003850934,0.00004029985,0.000009418796,0.00042921313,0.9897212,0.0049796263,0.0011450456,0.0016685176,0.00009380146],"about_ca_topic_score_codex":0.0000015452054,"about_ca_topic_score_gemma":0.0000020086732,"teacher_disagreement_score":0.570221,"about_ca_system_score_codex":0.00018717129,"about_ca_system_score_gemma":0.000014198903,"threshold_uncertainty_score":0.37337285},"labels":[],"label_agreement":null},{"id":"W4411270372","doi":"10.1109/access.2025.3579635","title":"Uncertainty Impact on Aggregator Performance for Peak Shaving","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Atlantic Canada Opportunities Agency","keywords":"News aggregator; Computer science; Peaking power plant; Reliability engineering; Engineering; Operating system; Electrical engineering","score_opus":0.014384507396907727,"score_gpt":0.2949709187834145,"score_spread":0.2805864113865068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411270372","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97696775,0.00010214833,0.013846014,0.000046850982,0.001740617,0.00016859587,0.000015105956,0.00019419711,0.006918729],"genre_scores_gemma":[0.9993314,0.000025924892,0.000044830307,0.00005890558,0.00017138492,0.00006676175,0.000006031058,0.00000946015,0.00028529184],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961054,0.000004050717,0.000109097295,0.00009502406,0.00005271825,0.00012855382],"domain_scores_gemma":[0.9997577,0.00003555907,0.000017126245,0.00012262055,0.0000425564,0.000024401157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000042215554,0.00009269816,0.00008411446,0.00008824491,0.00007007076,0.00008169409,0.00014778203,0.000041611973,0.000040919585],"category_scores_gemma":[0.000008938828,0.00007583107,0.000055561868,0.00014861832,0.000012637435,0.00023018483,0.000006048335,0.000083376384,0.000009673529],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008348589,0.00001583219,0.010123063,0.00027059118,0.00009536654,5.7390366e-7,0.00007448596,0.35018393,0.004681977,0.0023886857,0.019138489,0.61294353],"study_design_scores_gemma":[0.0009139165,0.00011087113,0.039997954,0.00045749522,0.000042439817,0.0000047343037,0.000042856434,0.8254282,0.10966131,0.001228223,0.021698307,0.00041368906],"about_ca_topic_score_codex":0.000023073053,"about_ca_topic_score_gemma":0.00002427889,"teacher_disagreement_score":0.6125298,"about_ca_system_score_codex":0.00012827989,"about_ca_system_score_gemma":0.000030474188,"threshold_uncertainty_score":0.30923012},"labels":[],"label_agreement":null},{"id":"W4411272046","doi":"10.1109/msr66628.2025.00100","title":"How Do Infrastructure-as-Code Practitioners Update Their Dependencies? An Empirical Study on Terraform Module Updates","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; École de Technologie Supérieure; Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Code (set theory); Empirical research; Programming language","score_opus":0.011402367568528707,"score_gpt":0.26523786351194356,"score_spread":0.25383549594341487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411272046","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9455504,0.000027028533,0.022943959,0.0011482316,0.0009007634,0.00033103346,0.00002005558,0.00064694864,0.028431619],"genre_scores_gemma":[0.9983035,0.000014523279,0.00054186565,0.00046710946,0.000067770736,0.00004997166,0.000036615354,0.000017932018,0.00050072547],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999163,0.0000321029,0.0001844847,0.00025623932,0.00017383932,0.00019033825],"domain_scores_gemma":[0.9994793,0.00002405108,0.0000303334,0.00033133195,0.00006831349,0.000066674555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008786293,0.00020655984,0.00015432341,0.00019292743,0.00012745526,0.00028606807,0.00016669203,0.00012240859,0.00027216141],"category_scores_gemma":[0.000022240214,0.00015635649,0.000048022495,0.00026216725,0.00003469165,0.0006329342,0.000025059395,0.00029979032,0.00003882878],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045096094,0.0013788155,0.12923525,0.00015227438,0.0017609847,0.000041818952,0.009198837,0.04373101,0.017124139,0.25712124,0.12020549,0.41959918],"study_design_scores_gemma":[0.0048857494,0.0016093915,0.18098332,0.00013680811,0.000275397,0.0001769356,0.1379589,0.16864082,0.14709102,0.09883233,0.2567073,0.0027020157],"about_ca_topic_score_codex":0.00001727293,"about_ca_topic_score_gemma":0.00014453393,"teacher_disagreement_score":0.41689715,"about_ca_system_score_codex":0.00010710866,"about_ca_system_score_gemma":0.00004361359,"threshold_uncertainty_score":0.6376033},"labels":[],"label_agreement":null},{"id":"W4411283738","doi":"10.2174/0118741495375592250610133455","title":"Ability of Technologies to Collect the Positioning and Occupancy of Work Crews and Resources on Construction Job Sites","year":2025,"lang":"en","type":"article","venue":"The Open Civil Engineering Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Occupancy; Work (physics); Engineering; Post-occupancy evaluation; Transport engineering; Construction engineering; Computer science; Architectural engineering; Mechanical engineering","score_opus":0.006796001610690171,"score_gpt":0.2151367394910073,"score_spread":0.20834073788031715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411283738","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9853391,0.0011737236,0.009553533,0.0007259609,0.00021341065,0.00021208124,0.000003994827,0.00005854198,0.0027196552],"genre_scores_gemma":[0.99789727,0.00011640572,0.0019235361,0.000009252341,0.000016553166,0.00000956988,1.6851806e-7,0.0000054965208,0.000021720974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99953973,0.00002208612,0.00021311684,0.000068339476,0.000073740266,0.00008298592],"domain_scores_gemma":[0.99960625,0.00015130357,0.000045196797,0.00013230734,0.000049201917,0.000015749118],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003098953,0.0000836507,0.00013867501,0.00011761476,0.0001479163,0.00010673201,0.0001817233,0.000044757086,0.000009248135],"category_scores_gemma":[0.00011072647,0.000052800002,0.000022760874,0.00035161004,0.00009209629,0.00008017597,0.00006250022,0.00022650554,1.9366563e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00062934647,0.000053253607,0.07448582,0.00058653794,0.0009133032,0.0000032736289,0.007039653,0.33842164,0.15361677,0.080840304,0.0053599416,0.33805016],"study_design_scores_gemma":[0.0032176184,0.0009066859,0.68657357,0.007108203,0.0004812722,0.0010980399,0.015823333,0.08231537,0.16049013,0.028915131,0.011791484,0.0012791484],"about_ca_topic_score_codex":0.000008723454,"about_ca_topic_score_gemma":0.000014766311,"teacher_disagreement_score":0.6120878,"about_ca_system_score_codex":0.000025820584,"about_ca_system_score_gemma":0.000011733224,"threshold_uncertainty_score":0.21531217},"labels":[],"label_agreement":null},{"id":"W4411379290","doi":"10.1061/jcemd4.coeng-15724","title":"Assessing an Immersive Virtual Reality–Based Simulation Game Capability to Study the Social Mechanisms Enabled by the Last Planner System in Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Virtual reality; Human–computer interaction; Computer science; Simulation; Artificial intelligence","score_opus":0.011604140962274663,"score_gpt":0.25556153245668267,"score_spread":0.243957391494408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411379290","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5351211,0.000026400376,0.46357247,0.00013666137,0.000658351,0.0003354918,0.0000015665017,0.000034390454,0.00011355314],"genre_scores_gemma":[0.9993676,0.0000028474954,0.0005142212,0.000022720656,0.000052120362,0.000025859583,0.0000011702429,0.000007523223,0.0000059491053],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999194,0.00007832368,0.00034493892,0.00010137433,0.00017096529,0.00011037439],"domain_scores_gemma":[0.9996753,0.00005334277,0.00007569717,0.000094764866,0.00007284466,0.00002808464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005395467,0.00011258648,0.00014522308,0.00021223747,0.00011681042,0.00012932198,0.00008613368,0.00004170773,0.0000018008186],"category_scores_gemma":[0.000013062718,0.0000783478,0.000033338518,0.00030056233,0.000020828335,0.00021690194,0.000014675177,0.0001813143,1.937203e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028189712,0.000028410555,0.0001020936,0.000075742624,0.00012072393,0.000003144674,0.0009335836,0.9558506,0.0007227722,0.008263866,0.000056530473,0.033814337],"study_design_scores_gemma":[0.0015576468,0.00015370964,0.0131444195,0.00019649799,0.00019187097,0.00003672767,0.080434866,0.90175396,0.0009148008,0.0001516404,0.00125046,0.00021341944],"about_ca_topic_score_codex":0.000011561723,"about_ca_topic_score_gemma":0.000011688022,"teacher_disagreement_score":0.46424648,"about_ca_system_score_codex":0.00016598748,"about_ca_system_score_gemma":0.000015934658,"threshold_uncertainty_score":0.3194931},"labels":[],"label_agreement":null},{"id":"W4411414079","doi":"10.69554/bxip3397","title":"Avoiding disastrous data-based decisions: The secret to meaningful workplace insights","year":2025,"lang":"en","type":"article","venue":"Corporate real estate journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Overconfidence effect; Ingenuity; Quality (philosophy); Decision quality; Key (lock); Data quality; Nomothetic and idiographic; Computer science; Real estate; Data science; Risk analysis (engineering); Management science; Knowledge management; Business; Marketing; Psychology; Engineering; Economics; Computer security; Finance","score_opus":0.04140121606694259,"score_gpt":0.2604750077955436,"score_spread":0.21907379172860103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411414079","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4872485,0.00024535728,0.49400005,0.0006496123,0.0024701997,0.0002156774,0.000030899093,0.00022499428,0.0149146905],"genre_scores_gemma":[0.99403614,0.0016593407,0.003599191,0.00014548116,0.00021251367,0.0000107833075,0.000045880057,0.000027585049,0.00026309516],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988297,0.00014348746,0.00039490827,0.00017963962,0.00022177116,0.00023045196],"domain_scores_gemma":[0.99885845,0.0002821253,0.0001315461,0.00040070902,0.0001821836,0.00014501218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054977654,0.00017358994,0.00016571557,0.00019779148,0.0005286448,0.0003186899,0.00046946987,0.00006593499,0.000024089757],"category_scores_gemma":[0.00020951976,0.00011865862,0.000043265223,0.00073703687,0.000046785146,0.00029660788,0.00006323094,0.0007279482,0.00003981887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015527297,0.000025140629,0.0010770567,0.000020466265,0.0001236513,0.000098073026,0.00095125806,0.19414014,0.0025359911,0.0036615054,0.031755377,0.7654561],"study_design_scores_gemma":[0.0023189427,0.00020281665,0.005065188,0.0017382446,0.0002773007,0.0008471864,0.008646985,0.7043307,0.0052614924,0.020682873,0.2495451,0.0010831797],"about_ca_topic_score_codex":0.000020356956,"about_ca_topic_score_gemma":0.00019287804,"teacher_disagreement_score":0.7643729,"about_ca_system_score_codex":0.00013803168,"about_ca_system_score_gemma":0.00020411603,"threshold_uncertainty_score":0.48387584},"labels":[],"label_agreement":null},{"id":"W4411484891","doi":"10.1109/icccbda64898.2025.11030527","title":"Enhancing Infrastructure-as-Code with Objectoriented Programming for Improving Maintainability","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Maintainability; Computer science; Programming language; Code (set theory); Operating system; Software engineering","score_opus":0.0022840101050094247,"score_gpt":0.2089895342650003,"score_spread":0.20670552415999088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411484891","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20290789,0.000029029929,0.7915519,0.000048513724,0.00043202878,0.00045767962,0.0000025580255,0.00052181026,0.0040486143],"genre_scores_gemma":[0.96690476,6.628277e-7,0.032440566,0.000047476617,0.000042940555,0.00017558005,0.000007429119,0.000013350545,0.00036721647],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993616,0.0000064124247,0.00018012046,0.00017127172,0.000074575786,0.00020606758],"domain_scores_gemma":[0.99963397,0.00003631505,0.000019971156,0.00014724482,0.00012978037,0.00003271024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000970025,0.00012308301,0.00010968525,0.000082052466,0.000099794575,0.000069675865,0.000069563925,0.00007242084,0.000032741893],"category_scores_gemma":[0.000057678084,0.000099366014,0.000037740618,0.00024295996,0.00003336062,0.00012909902,0.000012014556,0.00011539764,0.000001274046],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000164325,0.000027164417,0.010419329,0.0011167952,0.00015042946,0.0000014350805,0.0006833222,0.0042634862,0.049835294,0.2006427,0.00033174225,0.732364],"study_design_scores_gemma":[0.0026687146,0.00041556158,0.0074829287,0.00023720814,0.00017296034,0.00004191702,0.009910208,0.10000748,0.78604144,0.026331061,0.065645255,0.0010452388],"about_ca_topic_score_codex":0.00006201958,"about_ca_topic_score_gemma":0.00049591815,"teacher_disagreement_score":0.7639969,"about_ca_system_score_codex":0.0001682319,"about_ca_system_score_gemma":0.00008162372,"threshold_uncertainty_score":0.40520287},"labels":[],"label_agreement":null},{"id":"W4411864846","doi":"10.1007/978-981-96-2802-5_34","title":"Digital Twinning of Existing Indoor Space for Improved Indoor Environmental Quality Monitoring and Assessment","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Environmental quality; Crystal twinning; Environmental science; Quality (philosophy); Space (punctuation); Computer science; Materials science; Political science; Physics","score_opus":0.015098866154901832,"score_gpt":0.25117124689516707,"score_spread":0.23607238074026524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411864846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00964789,0.0048528933,0.9356468,0.000058660033,0.002322115,0.0011315389,0.00042008093,0.00045688686,0.045463145],"genre_scores_gemma":[0.9849577,0.00012686464,0.013519185,0.000003758971,0.00030041576,0.00005489081,0.000063446736,0.00009200013,0.00088174926],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987975,0.0000041653166,0.000514821,0.0003061273,0.00013570937,0.00024168812],"domain_scores_gemma":[0.99923676,0.00038814542,0.000111678055,0.00019308188,0.000021574571,0.00004877454],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012483727,0.00039769808,0.0004776852,0.00027765048,0.000036598398,0.00006377359,0.00010125665,0.00038717582,0.000012522078],"category_scores_gemma":[0.00010053708,0.00044955465,0.00011177916,0.000051768126,0.000034832046,0.00013702964,0.000055797125,0.00067262974,2.881004e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060439983,0.000031790853,0.008168404,0.004247309,0.00066556275,0.0000071714076,0.00063816056,0.11750092,0.08061465,0.018889362,0.000017821634,0.7691584],"study_design_scores_gemma":[0.0063977325,0.00046316118,0.009057402,0.012737684,0.0005519571,0.00008364719,0.00021653553,0.77453893,0.11102939,0.016124314,0.06239737,0.0064018643],"about_ca_topic_score_codex":0.00000585881,"about_ca_topic_score_gemma":0.000015317097,"teacher_disagreement_score":0.9753098,"about_ca_system_score_codex":0.00027712283,"about_ca_system_score_gemma":0.00003020525,"threshold_uncertainty_score":0.9997956},"labels":[],"label_agreement":null},{"id":"W4411929702","doi":"10.2139/ssrn.5335994","title":"A Multi-User Game-Based System for Planning Modular Construction Activities","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Modular construction; Human–computer interaction; Operating system","score_opus":0.009329120363591474,"score_gpt":0.23127232615344676,"score_spread":0.22194320578985527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411929702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04487647,0.0034899288,0.94649565,0.0000445699,0.0038355535,0.00040188732,0.00006279965,0.0004210977,0.00037202568],"genre_scores_gemma":[0.9906023,0.00035025892,0.007360618,0.000012328308,0.0005982951,0.00018343504,0.000049838527,0.00005092027,0.00079197733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979547,0.00005547113,0.00042921264,0.0002563305,0.00018057707,0.0011236608],"domain_scores_gemma":[0.99936116,0.00004959831,0.00018816478,0.00021280488,0.00013462901,0.000053627053],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00047171925,0.00033243527,0.0003660208,0.00037263733,0.00017347894,0.00015724478,0.00021588328,0.00041033278,0.0000052264318],"category_scores_gemma":[0.000018362456,0.0003422913,0.00028414605,0.00009846212,0.000045096753,0.00012980103,0.000027067574,0.0028638616,0.0000019061537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015130366,0.000027803231,0.0004487028,0.001296059,0.00119488,0.0000027388273,0.00029298765,0.8155545,0.0018152248,0.13047096,0.0001276972,0.048617117],"study_design_scores_gemma":[0.0038013733,0.00018319665,0.00009656695,0.0028556136,0.0006111177,0.00090050703,0.015582064,0.9235079,0.009808036,0.033449434,0.007859582,0.001344551],"about_ca_topic_score_codex":0.000018648472,"about_ca_topic_score_gemma":0.00007429903,"teacher_disagreement_score":0.94572586,"about_ca_system_score_codex":0.0024283547,"about_ca_system_score_gemma":0.0019316302,"threshold_uncertainty_score":0.9999029},"labels":[],"label_agreement":null},{"id":"W4412007554","doi":"10.3390/buildings15132338","title":"Understanding the Disruptiveness of Integrated Project Delivery (IPD) in the AEC Industry","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Engineering; Integrated project delivery; Systems engineering; Construction engineering; Manufacturing engineering; Project management","score_opus":0.038152690510596124,"score_gpt":0.2561770530719631,"score_spread":0.21802436256136698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412007554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94930923,0.00029453947,0.036219534,0.00031447643,0.00037778864,0.0002740282,0.000007863336,0.000075683965,0.013126834],"genre_scores_gemma":[0.99972194,0.000030360501,0.00007404212,0.00006127249,0.00001656254,0.000027817765,0.0000023221903,0.0000054471493,0.000060251066],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9995449,0.00004009814,0.00015661998,0.00007646922,0.00008343754,0.00009843941],"domain_scores_gemma":[0.9997383,0.00008625415,0.000024559213,0.000118371674,0.00002699919,0.000005550418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021120916,0.00007903733,0.00008247595,0.00012272068,0.00005609211,0.000034160785,0.0001684916,0.00011165376,0.000016442758],"category_scores_gemma":[0.000026002874,0.000046037734,0.000033697506,0.00067582924,0.0000716727,0.000081174316,0.000014015916,0.00035945035,7.067877e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010660049,0.00007831278,0.047510784,0.0002934788,0.0002212825,0.000008249027,0.01046005,0.010637308,0.01808387,0.7995114,0.010680529,0.10240813],"study_design_scores_gemma":[0.0046838773,0.00023646554,0.11308798,0.003460097,0.00041967686,0.00015465691,0.4047128,0.15320487,0.09652738,0.08019511,0.14142625,0.0018908244],"about_ca_topic_score_codex":0.00017954152,"about_ca_topic_score_gemma":0.00007302146,"teacher_disagreement_score":0.7193163,"about_ca_system_score_codex":0.00012468462,"about_ca_system_score_gemma":0.000057726174,"threshold_uncertainty_score":0.18773644},"labels":[],"label_agreement":null},{"id":"W4412044970","doi":"10.1145/3715668.3736354","title":"Towards Interactive AI-assisted Material Selection for Sustainable Building Design","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Selection (genetic algorithm); Computer science; Assisted living; Architectural engineering; Human–computer interaction; Artificial intelligence; Engineering","score_opus":0.007777514216300937,"score_gpt":0.24843284211735778,"score_spread":0.24065532790105684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412044970","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013068528,0.000008927321,0.97236747,0.00010254048,0.0007874017,0.00026343408,0.0000014704644,0.00035505818,0.013045201],"genre_scores_gemma":[0.97933453,0.000001963995,0.016972963,0.000056701443,0.0000798871,0.00014808745,0.000005539304,0.000010049613,0.0033902675],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996044,0.000013149222,0.00011877166,0.00009215321,0.000033854394,0.00013769274],"domain_scores_gemma":[0.99974823,0.00002413768,0.000011418484,0.000043478383,0.0001578123,0.00001493035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006835694,0.000077042096,0.00007733105,0.00012800108,0.000078600875,0.00010494403,0.000038406608,0.000065217144,0.00013781083],"category_scores_gemma":[0.000025880761,0.00007353362,0.00003233646,0.00018338328,0.000008058166,0.00024815608,0.0000072094804,0.000058710542,0.0000021406406],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004627553,0.000035517514,0.000097094024,0.00032732793,0.00025686587,0.0000011131898,0.0001951734,0.01438769,0.17197566,0.550592,0.05877468,0.20289415],"study_design_scores_gemma":[0.0005190192,0.00005277526,0.00026551736,0.000028842802,0.00003252717,0.000007814544,0.000650805,0.17878929,0.7802431,0.015271463,0.023986109,0.00015273463],"about_ca_topic_score_codex":0.00006683954,"about_ca_topic_score_gemma":0.000011644739,"teacher_disagreement_score":0.96626604,"about_ca_system_score_codex":0.00021886683,"about_ca_system_score_gemma":0.000047926467,"threshold_uncertainty_score":0.2998614},"labels":[],"label_agreement":null},{"id":"W4412059615","doi":"10.55300/gz87bq40","title":"Keuntungan, Batasan, dan Tantangan Penggunaan Building Information Modeling dalam Proses Pembelajaran","year":2025,"lang":"en","type":"article","venue":"Archvisual Jurnal Arsitektur dan Perencanaan","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Mathematics education; Computer science; Psychology","score_opus":0.008920599286025576,"score_gpt":0.23968094172274476,"score_spread":0.2307603424367192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412059615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9552424,0.00028613364,0.02934757,0.00015139312,0.0009088273,0.00030370726,0.00003728943,0.00049297273,0.013229703],"genre_scores_gemma":[0.9982424,0.000109952794,0.0009835752,0.00014563564,0.00016240876,0.00003504718,0.0001725078,0.000029672276,0.00011880626],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99811405,0.00005775564,0.000664459,0.00027719972,0.00038011352,0.00050639396],"domain_scores_gemma":[0.9991672,0.000045678695,0.00008835394,0.00031248454,0.00019847997,0.0001878169],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002172452,0.0003672245,0.00030731424,0.0005651449,0.00042613255,0.0002961603,0.00037811825,0.00016227193,0.000048116668],"category_scores_gemma":[0.000050559338,0.00036565948,0.00013844622,0.0006432195,0.00008902497,0.0013396756,0.000086380445,0.0006358482,0.000017972452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021807014,0.00020712934,0.048529204,0.0009360891,0.00075662765,0.00003090527,0.009008518,0.086351566,0.058913976,0.3331494,0.0024982886,0.4594002],"study_design_scores_gemma":[0.0013301546,0.00020300805,0.015146382,0.0005658877,0.00018313996,0.000146486,0.0050070807,0.9371147,0.015464624,0.0036904386,0.020050734,0.0010973369],"about_ca_topic_score_codex":0.00012014695,"about_ca_topic_score_gemma":0.0002526378,"teacher_disagreement_score":0.85076314,"about_ca_system_score_codex":0.00024076771,"about_ca_system_score_gemma":0.00013938251,"threshold_uncertainty_score":0.99987954},"labels":[],"label_agreement":null},{"id":"W4412098050","doi":"10.1080/13467581.2025.2527976","title":"Enhancing construction efficiency: assessing the values and barriers of integrating e-procurement with BIM","year":2025,"lang":"en","type":"article","venue":"Journal of Asian Architecture and Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Building information modeling; Procurement; Business; Process management; Construction engineering; Construction industry; Knowledge management; Risk analysis (engineering); Engineering; Computer science; Operations management; Marketing","score_opus":0.0022235665599648195,"score_gpt":0.2048105207704247,"score_spread":0.20258695421045989,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412098050","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5034565,0.0008288342,0.49511486,0.000117212076,0.00019768093,0.00004227329,3.874435e-7,0.000021339509,0.00022093423],"genre_scores_gemma":[0.9589624,0.0000426725,0.040908806,0.000009655167,0.000063389656,0.0000012968044,1.03188874e-7,0.000009146262,0.0000025402635],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993971,0.000014397745,0.00028565354,0.00007215937,0.0001226171,0.00010808842],"domain_scores_gemma":[0.99967784,0.0000661435,0.00009465648,0.000059006838,0.000060143113,0.00004218633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002379536,0.000118983466,0.00018031495,0.00025579514,0.00008755676,0.000074514246,0.000062454434,0.00004241227,0.0000014798969],"category_scores_gemma":[0.00006510282,0.00007426405,0.00003429127,0.0002485382,0.00006797853,0.00012321466,0.000012213529,0.0003221579,1.0366658e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027352158,0.0000065824665,0.0034596932,0.00072042795,0.0003475272,0.000006127999,0.0036412745,0.14812411,0.4060227,0.012478591,0.000024850282,0.42514077],"study_design_scores_gemma":[0.0019889714,0.00050897186,0.013135443,0.0117197735,0.000550185,0.0025728208,0.017501302,0.16262376,0.7797266,0.0066970065,0.0021273617,0.00084774336],"about_ca_topic_score_codex":0.0000015686619,"about_ca_topic_score_gemma":0.000002567833,"teacher_disagreement_score":0.4555059,"about_ca_system_score_codex":0.000030212746,"about_ca_system_score_gemma":0.000038875212,"threshold_uncertainty_score":0.30284},"labels":[],"label_agreement":null},{"id":"W4412101857","doi":"10.13189/cea.2025.131336","title":"Review of the Modular Construction System","year":2025,"lang":"en","type":"article","venue":"Civil Engineering and Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modular design; Modular construction; Engineering; Construction engineering; Systems engineering; Computer science; Architectural engineering; Engineering management; Operating system","score_opus":0.0018517112102698684,"score_gpt":0.1577335931516865,"score_spread":0.15588188194141664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412101857","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.071769826,0.23039256,0.6632083,0.0008256077,0.005576012,0.0007351922,0.00003772796,0.0012706403,0.026184123],"genre_scores_gemma":[0.99751514,0.001467376,0.000863408,0.00005023472,0.000041046067,0.000014135635,0.00000151621,0.000008674703,0.00003847917],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969745,0.000007641572,0.0001232286,0.00006354208,0.000043951153,0.000064181986],"domain_scores_gemma":[0.9998126,0.000012624472,0.000013857675,0.0001279169,0.00001842915,0.000014550386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004056205,0.00007665136,0.00010650921,0.00005020041,0.000027596356,0.000006183422,0.00005417246,0.000039686864,0.0000041215785],"category_scores_gemma":[0.000014967001,0.000054752516,0.000042231713,0.00018652,0.000026560847,0.000015274974,0.000011852342,0.00013164319,3.0406838e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004941199,0.0000075550925,0.0005467215,0.07782878,0.00023027044,9.541468e-7,0.00021240128,0.41272578,0.03259099,0.13083403,0.0028967238,0.34212086],"study_design_scores_gemma":[0.0010387793,0.00003833231,0.0066516246,0.12032993,0.00038841265,0.00061988074,0.0003102307,0.42860585,0.04022075,0.0018788796,0.39893907,0.0009782682],"about_ca_topic_score_codex":0.0000013530151,"about_ca_topic_score_gemma":0.0000022774723,"teacher_disagreement_score":0.9257453,"about_ca_system_score_codex":0.000015193176,"about_ca_system_score_gemma":0.000007568129,"threshold_uncertainty_score":0.22327428},"labels":[],"label_agreement":null},{"id":"W4412117412","doi":"10.1139/cjce-2025-0009","title":"Electrochemical surface engineering for optimizing concrete interactions with formwork and reinforcement","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formwork; Reinforcement; Electrochemistry; Materials science; Structural engineering; Engineering; Computer science; Composite material; Electrode; Chemistry","score_opus":0.003575045061351328,"score_gpt":0.17501560254649354,"score_spread":0.1714405574851422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412117412","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02407148,0.0011927193,0.9719533,0.000108738146,0.00070024875,0.00012067549,0.000003117855,0.000050946077,0.0017987957],"genre_scores_gemma":[0.98738945,0.000029088462,0.012395447,0.000018083747,0.000081280894,0.0000072579955,0.0000023636778,0.000020598922,0.000056430996],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940896,0.0000017454335,0.0002408401,0.000064649226,0.000051975312,0.00023182046],"domain_scores_gemma":[0.999564,0.000059875638,0.000033035576,0.000064261825,0.000091821654,0.00018699588],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007601569,0.00012759137,0.00016160321,0.00023234247,0.000049824306,0.00006504309,0.000069504764,0.000050594655,0.00001683232],"category_scores_gemma":[0.00003674877,0.0001271368,0.000046374054,0.00017088641,0.000013300496,0.00017428496,0.000002973813,0.00023654218,2.0898744e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014579249,3.9583153e-7,0.00010577593,0.00013979107,0.00019237798,0.00000459918,0.00013545026,0.9564052,0.03322287,0.008471858,0.000810181,0.00049691385],"study_design_scores_gemma":[0.0008619482,0.000097315766,0.00010231327,0.0008809537,0.00010378705,0.00031515158,0.00016303218,0.90151364,0.028977409,0.0000605657,0.06657637,0.00034750538],"about_ca_topic_score_codex":0.00002506493,"about_ca_topic_score_gemma":0.0016959263,"teacher_disagreement_score":0.963318,"about_ca_system_score_codex":0.00020030254,"about_ca_system_score_gemma":0.0001416271,"threshold_uncertainty_score":0.5184488},"labels":[],"label_agreement":null},{"id":"W4412218831","doi":"","title":"Whitepaper on Digitalization of Buildings:Digital planning an operational performance","year":2024,"lang":"en","type":"report","venue":"Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Anesthesia Research Foundation","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.016135223532989178,"score_gpt":0.2175828360523639,"score_spread":0.2014476125193747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412218831","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4060302,0.0010867752,0.033449445,0.0003614258,0.0012322989,0.0014500272,0.0017168684,0.0013551394,0.5533178],"genre_scores_gemma":[0.99167293,0.001105844,0.0029826232,0.00001118731,0.00008306344,4.7602734e-7,0.00038031407,0.00008046168,0.003683078],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.996517,0.00006087717,0.00076817884,0.0008058249,0.0014160472,0.00043205306],"domain_scores_gemma":[0.9973793,0.00019286812,0.00048668732,0.0007677462,0.00090787053,0.0002655234],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.00042197263,0.00061083917,0.0010963397,0.00095369405,0.00020964,0.00006311744,0.0011688401,0.0013868588,0.0007666201],"category_scores_gemma":[0.00013135039,0.00075810734,0.0005896487,0.0009817152,0.000871356,0.0010689233,0.0004002812,0.0012638737,0.00009750748],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0075028045,0.0055402126,0.026711212,0.017816372,0.0062241377,0.0022649462,0.0025021313,0.08190577,0.09774848,0.08596075,0.4878265,0.17799668],"study_design_scores_gemma":[0.011922306,0.010186005,0.06474737,0.03110875,0.0063397987,0.0028455702,0.007970896,0.03354474,0.015737057,0.006677304,0.7952079,0.013712299],"about_ca_topic_score_codex":0.000086629494,"about_ca_topic_score_gemma":0.00010414696,"teacher_disagreement_score":0.58564276,"about_ca_system_score_codex":0.0010039282,"about_ca_system_score_gemma":0.0006015722,"threshold_uncertainty_score":0.9999096},"labels":[],"label_agreement":null},{"id":"W4412273415","doi":"","title":"Digital entrepriseret:Retlige perspektiver for anvendelsen af Building Information Modelling (BIM) i bygge- og anlægssektoren","year":2018,"lang":"da","type":"article","venue":"Research at the University of Copenhagen (University of Copenhagen)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Building information modeling; Computer science; Environmental science; Architectural engineering; Engineering; Operations management","score_opus":0.03295431540649981,"score_gpt":0.2437684487304249,"score_spread":0.2108141333239251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412273415","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34298947,0.0030071845,0.38945603,0.0008359709,0.0005364363,0.002506913,0.001487142,0.00015706461,0.25902382],"genre_scores_gemma":[0.8565017,0.00041160785,0.002765399,0.000009854678,0.000116499206,3.6572513e-7,0.00016618703,0.000031788582,0.13999659],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99706435,0.000281104,0.00038117947,0.00050318247,0.0009865356,0.0007836294],"domain_scores_gemma":[0.99612826,0.00043960664,0.0003675776,0.0007542054,0.0020035324,0.00030680344],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0011491003,0.0003628711,0.0005534451,0.0004783754,0.0019362923,0.00017054011,0.0012252281,0.0003731578,0.11660586],"category_scores_gemma":[0.0000981942,0.0004312457,0.00041760138,0.0010124993,0.0015230068,0.003198959,0.0007188306,0.0005347043,0.0247867],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027562515,0.00013285768,0.000016565073,0.0005592694,0.001003355,0.000028384402,0.023754338,0.008235285,0.0036105209,0.0054376107,0.9164942,0.037971366],"study_design_scores_gemma":[0.002154668,0.0004581734,0.00031966425,0.00025922336,0.00022142385,0.000012927819,0.044709187,0.11117591,0.0052138786,0.00009515595,0.8349055,0.00047428792],"about_ca_topic_score_codex":0.0008158313,"about_ca_topic_score_gemma":0.00026806368,"teacher_disagreement_score":0.51351225,"about_ca_system_score_codex":0.00091341505,"about_ca_system_score_gemma":0.00045068332,"threshold_uncertainty_score":0.9998139},"labels":[],"label_agreement":null},{"id":"W4412368587","doi":"10.11159/ijci.2025.008","title":"Improving Operational Efficiency in Construction Businesses","year":2025,"lang":"en","type":"article","venue":"International Journal of Civil Infrastructure","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Operational efficiency; Marketing","score_opus":0.0026602198873757173,"score_gpt":0.21310043124196543,"score_spread":0.2104402113545897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412368587","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61795974,0.0010780445,0.34333357,0.0014690019,0.018758947,0.00014020628,0.000023391156,0.00009040272,0.017146662],"genre_scores_gemma":[0.99653095,0.000077883895,0.0028759516,0.00012439297,0.00033844516,0.00000243477,0.000005996841,0.000007461015,0.000036471713],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99899936,0.000017357403,0.00051388354,0.00008421649,0.00028410368,0.000101061894],"domain_scores_gemma":[0.99928135,0.00003718594,0.00012147082,0.00006461473,0.00046839463,0.000026992748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011305997,0.00011655863,0.0001466287,0.0006016263,0.000029890136,0.000101957376,0.00025448573,0.000098650075,0.00025905165],"category_scores_gemma":[0.0000928749,0.000105103805,0.000063669846,0.00030458672,0.00006204298,0.00045096796,0.000020325919,0.00030472517,0.000002198496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017478228,0.000066115026,0.05929061,0.00009119571,0.00033288822,0.00005768169,0.0004624935,0.3830052,0.037582275,0.123301834,0.008025467,0.38760945],"study_design_scores_gemma":[0.010373225,0.0002030923,0.3904381,0.0019554265,0.00016824105,0.0047209887,0.0024559214,0.27971786,0.059778776,0.14501056,0.10363854,0.0015392523],"about_ca_topic_score_codex":0.000009254098,"about_ca_topic_score_gemma":0.0000703558,"teacher_disagreement_score":0.38607022,"about_ca_system_score_codex":0.00020566618,"about_ca_system_score_gemma":0.00017415901,"threshold_uncertainty_score":0.42860088},"labels":[],"label_agreement":null},{"id":"W4412368845","doi":"10.1177/03611981251340386","title":"Illinois Tollway Specification Management and Resource Tool","year":2025,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Computer science; Process (computing); Bidding; Quality (philosophy); Resource (disambiguation); Bridge (graph theory); Software engineering; Change control; Schedule; Risk analysis (engineering); Engineering management; Control (management); Engineering; Business; Programming language","score_opus":0.03722630235783259,"score_gpt":0.3131850718766516,"score_spread":0.27595876951881904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412368845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9794783,0.0009406126,0.011480213,0.0018229005,0.0007482788,0.0008581215,0.000028047234,0.000071575225,0.004571949],"genre_scores_gemma":[0.99222606,0.0027294138,0.0021554714,0.000038649065,0.00011299189,0.000074064636,0.000012633673,0.000030748794,0.00261996],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9964352,0.00035446056,0.000985537,0.00025955992,0.0015115443,0.00045364504],"domain_scores_gemma":[0.9979089,0.00026982743,0.00012590548,0.0003575738,0.0012022834,0.00013554342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018610009,0.0001795027,0.00025641397,0.0010947876,0.00042725864,0.00014682354,0.0005020886,0.00015218655,0.00013787503],"category_scores_gemma":[0.000028247794,0.00014339984,0.0001706341,0.0018216035,0.00038043788,0.00039660552,0.000004848186,0.0012997058,0.000011918249],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016382474,0.00026655826,0.16626395,0.0017247016,0.0006841009,0.00009727906,0.0043464946,0.008483307,0.008609817,0.25638115,0.08116351,0.47034088],"study_design_scores_gemma":[0.0010863268,0.000112575,0.7508507,0.00041595928,0.000061280305,6.909885e-7,0.0029975418,0.0005907787,0.0025837044,0.011135369,0.22999209,0.0001730213],"about_ca_topic_score_codex":0.0004240805,"about_ca_topic_score_gemma":0.003561067,"teacher_disagreement_score":0.5845867,"about_ca_system_score_codex":0.00020634528,"about_ca_system_score_gemma":0.00011238317,"threshold_uncertainty_score":0.5847676},"labels":[],"label_agreement":null},{"id":"W4412430439","doi":"10.1080/15623599.2025.2530647","title":"Quantification of economic influences on technology adoption and diffusion in the construction industry","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan College; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Diffusion; Business; Industrial organization; Construction industry; Economic geography; Economics; Engineering; Construction engineering","score_opus":0.006926203295985709,"score_gpt":0.24708631096952324,"score_spread":0.24016010767353754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412430439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9790517,0.00013637295,0.011479787,0.0014339355,0.0025913513,0.00012234255,0.0000034132956,0.000020747275,0.0051603694],"genre_scores_gemma":[0.99769133,0.00052359485,0.0016618558,0.000038080732,0.000057390982,0.000007494823,0.000002052967,0.000003159958,0.000015026809],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9991478,0.00003232473,0.0004979059,0.00008434186,0.00017935046,0.000058320435],"domain_scores_gemma":[0.999525,0.000034984627,0.00021899054,0.00008841824,0.00012168888,0.000010934024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021647579,0.00008209788,0.00011142085,0.001015035,0.000029908928,0.00004122729,0.0001843058,0.00011567536,0.000020217632],"category_scores_gemma":[0.000013156015,0.000067839,0.000035946083,0.00021444177,0.00016315494,0.00019574241,0.000016471975,0.00026121025,0.0000017216369],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006523317,0.000023652168,0.036394052,0.000026777629,0.00012795189,0.0000028731977,0.00006542052,0.008878215,0.0011785451,0.56694984,0.00013175717,0.3861557],"study_design_scores_gemma":[0.007014545,0.0004317052,0.6029942,0.0024965592,0.00035261977,0.0017374234,0.038854767,0.026711201,0.026670655,0.25650156,0.03548179,0.0007530053],"about_ca_topic_score_codex":0.0000047439808,"about_ca_topic_score_gemma":0.0000074894015,"teacher_disagreement_score":0.56660014,"about_ca_system_score_codex":0.000115640876,"about_ca_system_score_gemma":0.000020259315,"threshold_uncertainty_score":0.2766394},"labels":[],"label_agreement":null},{"id":"W4412493587","doi":"10.1007/s44150-025-00135-5","title":"Identifying challenges for extended design for manufacturing and assembly (DfMA) in all phases of a construction project","year":2025,"lang":"en","type":"article","venue":"Architecture Structures and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"Mitacs","keywords":"Context (archaeology); Construction industry; Construction management; Engineering; Work (physics); Process management; Productivity; Conceptual framework; Function (biology); Knowledge management; Construction engineering; Computer science; Civil engineering","score_opus":0.03353039610107078,"score_gpt":0.287844381431861,"score_spread":0.2543139853307902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412493587","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54934245,0.0035498822,0.44399226,0.00016898512,0.0009638145,0.0014386787,0.000052539755,0.00014349485,0.00034789054],"genre_scores_gemma":[0.90013075,0.0007676163,0.09878103,0.000017199238,0.000077906705,0.0001819334,0.000015918133,0.00001979435,0.000007856306],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989405,0.00003946994,0.00037211576,0.00033134755,0.00008717958,0.00022935787],"domain_scores_gemma":[0.9994985,0.00018758133,0.000094792296,0.00012824507,0.00005770557,0.000033161185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013826415,0.00023920124,0.00031083962,0.00049133925,0.000111263806,0.00005547247,0.00006515961,0.00017500609,0.0000032799383],"category_scores_gemma":[0.000039436945,0.00022385882,0.0000709204,0.000114746945,0.00019161619,0.0001420786,0.000017957043,0.00016383505,2.0852923e-8],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024554358,0.0000064402534,0.00011792048,0.0007600758,0.0001333427,3.8073816e-7,0.00057142327,0.0009867792,0.014859372,0.053924955,0.000025031488,0.92836875],"study_design_scores_gemma":[0.0047897627,0.00033106594,0.008510499,0.0005063414,0.00029505434,0.00056091585,0.005498168,0.014302878,0.30455402,0.6562282,0.0036866071,0.000736524],"about_ca_topic_score_codex":0.00002191848,"about_ca_topic_score_gemma":0.00009756823,"teacher_disagreement_score":0.9276322,"about_ca_system_score_codex":0.000034050132,"about_ca_system_score_gemma":0.000037335867,"threshold_uncertainty_score":0.9128698},"labels":[],"label_agreement":null},{"id":"W4412670856","doi":"10.1016/j.autcon.2025.106429","title":"Architecture of tomorrow: The construction industry in the era of artificial intelligence","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Architecture; Engineering; Artificial intelligence; Construction industry; Architectural engineering; Engineering management; Computer science; Construction engineering; Manufacturing engineering; Art; Visual arts","score_opus":0.00922128614498672,"score_gpt":0.2375733588344598,"score_spread":0.22835207268947308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412670856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91392595,0.00011920897,0.08013227,0.00095109636,0.001273013,0.0003397947,0.000007841715,0.00007391889,0.0031768917],"genre_scores_gemma":[0.99723274,0.000025985453,0.0026177526,0.00003098823,0.00003799509,0.00004048498,0.000006025019,0.000004785754,0.0000032261466],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988544,0.00012309813,0.000633218,0.00011490182,0.00016735526,0.00010702429],"domain_scores_gemma":[0.9994143,0.00015893755,0.00013032313,0.00020981567,0.000077891964,0.000008686884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033501128,0.00010778559,0.00014945204,0.00029687112,0.000049071685,0.00002273581,0.0001565401,0.00028233582,0.000052480067],"category_scores_gemma":[0.00007319257,0.00007931119,0.000047049085,0.001164793,0.00031783662,0.00014303558,0.000010785463,0.00082912494,0.0000016708392],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016369624,0.000016401746,0.0070651714,0.00006834711,0.000014809862,2.802961e-7,0.0010359483,0.031464014,0.0022807778,0.2126441,0.000039226667,0.74535453],"study_design_scores_gemma":[0.00066107896,0.000092852024,0.14261104,0.0010811336,0.00009343025,0.0003274407,0.03898571,0.30206713,0.16262926,0.35014126,0.00079353305,0.00051611575],"about_ca_topic_score_codex":0.00008801274,"about_ca_topic_score_gemma":0.0002335118,"teacher_disagreement_score":0.7448384,"about_ca_system_score_codex":0.000059797025,"about_ca_system_score_gemma":0.000064847314,"threshold_uncertainty_score":0.36021814},"labels":[],"label_agreement":null},{"id":"W4412690923","doi":"10.22260/isarc2025/0070","title":"Exploring Cognitive Load and Task Complexity in Dynamic Tracking Tasks: Insights for Construction Workflows","year":2025,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workflow; Computer science; Task (project management); Cognitive load; Tracking (education); Cognition; Human–computer interaction; Task analysis; Systems engineering; Engineering; Psychology; Database","score_opus":0.04546509954832691,"score_gpt":0.24639485948442683,"score_spread":0.2009297599360999,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412690923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99294245,0.000341676,0.0014854241,0.00010660257,0.0004911062,0.00036522953,0.00000901863,0.000073409305,0.0041850936],"genre_scores_gemma":[0.9984611,0.00008437235,0.0012802201,0.000015773208,0.00002400374,0.00009812613,0.0000013777671,0.000009691758,0.000025311832],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994229,0.0000029869248,0.00022101433,0.00014130914,0.0000892512,0.00012251033],"domain_scores_gemma":[0.9996671,0.000048116006,0.000053566324,0.00003484386,0.00017922607,0.00001714228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000073689866,0.00010869966,0.00014998851,0.00012597714,0.00008254126,0.000039226215,0.00008288658,0.000053952394,0.0000023877772],"category_scores_gemma":[0.00007850731,0.00009354167,0.000037849386,0.00029802695,0.00014699168,0.00036404235,0.000027386424,0.00014616396,3.917636e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023194688,0.000056353685,0.014901876,0.001480136,0.00017487127,2.2333026e-7,0.008401834,0.00019729801,0.13104217,0.13964705,0.00017222558,0.70369405],"study_design_scores_gemma":[0.0057941023,0.00015740523,0.10531092,0.006321338,0.00033495686,0.00006302269,0.047790475,0.15031904,0.37221777,0.3072034,0.0033081502,0.0011793883],"about_ca_topic_score_codex":0.000014733904,"about_ca_topic_score_gemma":0.000059995877,"teacher_disagreement_score":0.70251465,"about_ca_system_score_codex":0.00009781915,"about_ca_system_score_gemma":0.000018066608,"threshold_uncertainty_score":0.38145185},"labels":[],"label_agreement":null},{"id":"W4412691132","doi":"10.22260/isarc2025/0208","title":"Mixed Reality-based Digital Twinning of Building Circularity: A Co-Design Approach for Sustainable Buildings","year":2025,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Crystal twinning; Computer science; Architectural engineering; Mixed reality; Augmented reality; Human–computer interaction; Materials science; Engineering; Metallurgy","score_opus":0.019399907699794255,"score_gpt":0.23596424485144865,"score_spread":0.2165643371516544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412691132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14505258,0.00013648473,0.8348471,0.00022871488,0.00014114322,0.0009451467,0.000017008271,0.0002115387,0.018420283],"genre_scores_gemma":[0.9754118,0.000001515726,0.02417811,0.000023832494,0.000032124182,0.000090175745,0.000003844418,0.000022173752,0.00023646855],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99902,0.000004443012,0.00034838048,0.00019100637,0.00018237106,0.0002538271],"domain_scores_gemma":[0.9992086,0.000072805866,0.0001305652,0.00011055638,0.00044824393,0.00002918262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042481135,0.00015490076,0.0002536688,0.00019438042,0.00011870875,0.000105390594,0.00031512356,0.00011216782,0.0000020709358],"category_scores_gemma":[0.00024670418,0.00013430887,0.00016106988,0.0005066072,0.00011488395,0.00032399438,0.000042412525,0.00015236512,1.06420835e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022567016,0.00015160668,0.0074150185,0.0074890926,0.0003635609,2.4111733e-7,0.0005976336,0.03306795,0.21098332,0.71166354,0.014339142,0.013703208],"study_design_scores_gemma":[0.0010754118,0.00006425201,0.00029451135,0.00036299202,0.0001323395,0.000005817922,0.0034025568,0.23051938,0.7185316,0.039918628,0.005381436,0.00031109556],"about_ca_topic_score_codex":0.00002226882,"about_ca_topic_score_gemma":8.956442e-8,"teacher_disagreement_score":0.83035916,"about_ca_system_score_codex":0.000106592524,"about_ca_system_score_gemma":0.00006219284,"threshold_uncertainty_score":0.54769564},"labels":[],"label_agreement":null},{"id":"W4412753985","doi":"10.1080/15623599.2025.2538690","title":"BIM adoption and implementation in the civil and transportation infrastructure sector: analysis of governmental roadmaps and action plans","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Action (physics); Business; Civil infrastructure; Process management; Engineering; Transport engineering; Risk analysis (engineering)","score_opus":0.004048248722485261,"score_gpt":0.2410887364556989,"score_spread":0.23704048773321362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412753985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96846384,0.0001556522,0.029712252,0.00022223103,0.0005539631,0.00011786576,0.000041113868,0.000008628808,0.00072446436],"genre_scores_gemma":[0.99779546,0.0012059261,0.0008888331,0.000040781357,0.00003163689,0.0000050406466,0.000025274358,0.000002986939,0.0000040662085],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991552,0.000029538827,0.00042984454,0.00008226664,0.00025146466,0.00005167086],"domain_scores_gemma":[0.99966,0.000027149756,0.00017937823,0.000042393083,0.00007538609,0.000015657479],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001751216,0.00008272171,0.00012531216,0.0006427811,0.000028920877,0.00005244743,0.00006247058,0.000039610022,0.00003354156],"category_scores_gemma":[0.000002826549,0.00007089912,0.00004007921,0.00028225456,0.000059166636,0.00028537013,0.0000068579907,0.00010116767,5.4301793e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016683103,0.000026768786,0.3669858,0.00012385618,0.002507332,0.00000699564,0.001238446,0.009776929,0.0021139665,0.1295609,0.00023575856,0.4872564],"study_design_scores_gemma":[0.0010026383,0.0000332838,0.9723846,0.000057869038,0.0005286456,0.00006499484,0.015631903,0.005130597,0.0004595509,0.003153458,0.0014738403,0.00007865274],"about_ca_topic_score_codex":0.000026804455,"about_ca_topic_score_gemma":0.00073243555,"teacher_disagreement_score":0.6053988,"about_ca_system_score_codex":0.00011400878,"about_ca_system_score_gemma":0.0000084372095,"threshold_uncertainty_score":0.28911823},"labels":[],"label_agreement":null},{"id":"W4412754668","doi":"10.11159/iccste25.106","title":"An Investigation of the contribution of 4IR to Competencies of Architects","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Computer science; Engineering","score_opus":0.008134488648865706,"score_gpt":0.20565334457553722,"score_spread":0.1975188559266715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9982487,0.00001642862,0.00076589984,0.00020470968,0.00031876506,0.00013914332,0.000041098538,0.000018502502,0.0002467587],"genre_scores_gemma":[0.9995739,0.000007920797,0.00037332013,0.000009511774,0.000010343825,0.000007063173,0.0000068737822,0.00000395739,0.000007140513],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993713,0.0000022923664,0.0003066991,0.00007857627,0.0001867625,0.000054361222],"domain_scores_gemma":[0.9994023,0.000018213457,0.00011785316,0.00004792937,0.0003954251,0.000018316987],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000054445525,0.00008501435,0.00012715059,0.00011499327,0.000021573087,0.0000088426395,0.00019313533,0.000036770332,0.0000070442547],"category_scores_gemma":[0.000023943587,0.000059633876,0.000045854733,0.00020779882,0.00006643386,0.000121363955,0.0000060036086,0.00008233812,2.9524392e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021735923,0.000002639523,0.028465105,0.00012794977,0.00003644655,7.2649735e-9,0.00055542827,0.01323803,0.64947826,0.3073719,0.000003494556,0.0006989966],"study_design_scores_gemma":[0.00015396877,0.000027444039,0.4117488,0.00035785805,0.000018405064,6.35913e-7,0.00018587706,0.030290306,0.5527127,0.0044459184,0.0000073520073,0.00005079196],"about_ca_topic_score_codex":0.000031133117,"about_ca_topic_score_gemma":0.000060832153,"teacher_disagreement_score":0.38328367,"about_ca_system_score_codex":0.00001610578,"about_ca_system_score_gemma":0.00001888017,"threshold_uncertainty_score":0.24317989},"labels":[],"label_agreement":null},{"id":"W4412754711","doi":"10.11159/iccste25.184","title":"BIM Methodology and Montecarlo Analysis as Mitigation Tools of Construction Cost Overrun","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost overrun; Computer science; Monte Carlo method; Construction engineering; Engineering; Construction industry; Mathematics","score_opus":0.020200943834355972,"score_gpt":0.24829239973654943,"score_spread":0.22809145590219346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754711","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.992514,0.000062342915,0.004963811,0.0002245258,0.0004224643,0.00014074547,0.000054060532,0.00004613607,0.0015719212],"genre_scores_gemma":[0.997977,0.00010464749,0.001822908,0.000014275318,0.00001615627,0.00001555472,0.000017939963,0.000005564882,0.00002592214],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9993045,0.0000033665672,0.00031561984,0.00014291413,0.0001572536,0.00007634756],"domain_scores_gemma":[0.99952877,0.0000482223,0.00010600087,0.000041170104,0.00025127205,0.000024593497],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007544917,0.00012579953,0.00019497733,0.00027713005,0.000036191297,0.00003847092,0.00010847472,0.000075463344,0.00003371356],"category_scores_gemma":[0.0000423215,0.00010509394,0.00006961778,0.00031822384,0.00008145121,0.00025148288,0.000006575282,0.00012544333,9.8366286e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043001703,0.000003241438,0.024534712,0.00015439412,0.00047451258,9.8904046e-8,0.00030184662,0.008768037,0.089929424,0.86291575,0.000006853417,0.012868098],"study_design_scores_gemma":[0.0007132937,0.000049964212,0.5536555,0.00033300367,0.00048343794,0.0000132081095,0.0012025678,0.20225798,0.21301197,0.027854554,0.00013781419,0.00028671525],"about_ca_topic_score_codex":0.000041954765,"about_ca_topic_score_gemma":0.00005359846,"teacher_disagreement_score":0.83506125,"about_ca_system_score_codex":0.00002450177,"about_ca_system_score_gemma":0.000012743493,"threshold_uncertainty_score":0.42856064},"labels":[],"label_agreement":null},{"id":"W4412754712","doi":"10.11159/iccste25.303","title":"Development and Analysis of Five-Dimensional BIM in Construction Management, Case Study – Multifamily Housing","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Computer science; Construction engineering; Engineering","score_opus":0.011465922727158321,"score_gpt":0.22446736060770306,"score_spread":0.21300143788054474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.998949,0.00002085922,0.0002908652,0.000022220078,0.00022484027,0.00014996299,0.000014077392,0.000026818858,0.00030135206],"genre_scores_gemma":[0.9976465,0.000012674573,0.0022971435,0.0000045278803,0.000004322602,0.00001286041,0.0000068479835,0.0000045425063,0.000010542062],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99931985,0.0000015864144,0.00032364661,0.00013943405,0.00014867938,0.000066825894],"domain_scores_gemma":[0.9997551,0.000014425979,0.00006733063,0.00003106022,0.000115676776,0.000016433603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005958345,0.00011224633,0.00015510074,0.00047701536,0.000036977264,0.000023585162,0.000070850125,0.000034355846,0.000007736756],"category_scores_gemma":[0.000004520484,0.00009479015,0.000031569893,0.0003968763,0.000034070355,0.0001352158,0.0000091203565,0.000092885035,3.1569733e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013216493,0.00006636474,0.47043982,0.0006885196,0.002943988,0.000021434033,0.005628013,0.14684297,0.027196651,0.29437214,0.000004587857,0.05166333],"study_design_scores_gemma":[0.00067584775,0.0000136174895,0.64298964,0.00023865051,0.00023249001,0.000016478585,0.005375174,0.34406355,0.005766855,0.00046201044,0.000011428394,0.00015428268],"about_ca_topic_score_codex":0.00006075036,"about_ca_topic_score_gemma":0.0003617117,"teacher_disagreement_score":0.29391015,"about_ca_system_score_codex":0.000030523195,"about_ca_system_score_gemma":0.000007958548,"threshold_uncertainty_score":0.386543},"labels":[],"label_agreement":null},{"id":"W4412754729","doi":"10.11159/iccste25.330","title":"Towards Sustainable Construction: A Simulation-Driven Evaluation of a 3D-Printed Building for DGNB Certification","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Certification; 3d printed; Computer science; Architectural engineering; Construction engineering; Construction industry; Systems engineering; Manufacturing engineering; Engineering management; Engineering; Management","score_opus":0.020527819179698047,"score_gpt":0.2636622341842568,"score_spread":0.2431344150045588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9753748,0.000047650094,0.020948082,0.00030030907,0.0006649296,0.0005430869,0.00004589842,0.00007876806,0.0019964718],"genre_scores_gemma":[0.9967797,0.000014887279,0.0030168502,0.0000070654382,0.000033514803,0.00008044599,0.000020061334,0.000010016025,0.000037471524],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990196,0.0000030162414,0.00039205307,0.00016444376,0.00031050606,0.000110375084],"domain_scores_gemma":[0.9983659,0.000036019723,0.00013735855,0.000057503523,0.0013812158,0.00002204339],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015330421,0.00014063687,0.0001519342,0.00021523327,0.000068075846,0.000045038585,0.00016569361,0.000073150666,0.0000362154],"category_scores_gemma":[0.00009154271,0.0001222656,0.00006445471,0.00024224675,0.000053333493,0.00028427507,0.000007313605,0.000104392995,8.803794e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053790143,0.0000059342838,0.001831732,0.00034799732,0.00011851033,2.397707e-8,0.0002984479,0.30054486,0.0487464,0.636346,0.000011820924,0.011694529],"study_design_scores_gemma":[0.00053401565,0.000018008184,0.02272439,0.00023039713,0.00009211129,0.0000013665659,0.0004904373,0.91381395,0.04716053,0.014689773,0.00012832809,0.00011670849],"about_ca_topic_score_codex":0.000015680076,"about_ca_topic_score_gemma":0.000011347146,"teacher_disagreement_score":0.6216562,"about_ca_system_score_codex":0.00009434136,"about_ca_system_score_gemma":0.00005095603,"threshold_uncertainty_score":0.49858466},"labels":[],"label_agreement":null},{"id":"W4412754754","doi":"10.11159/iccste25.241","title":"Life Cycle Assessment of Cementitious Bricks","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cementitious; Life-cycle assessment; Environmental science; Materials science; Metallurgy; Cement; Production (economics); Economics","score_opus":0.008366653289240474,"score_gpt":0.22569857243019234,"score_spread":0.21733191914095187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98637974,0.000032628668,0.0017199535,0.00030234858,0.0006622979,0.00010282615,0.00003566318,0.000054172986,0.01071035],"genre_scores_gemma":[0.9994173,0.00004185959,0.00042251693,0.000023433302,0.000019152072,0.000011014343,0.000007965501,0.000005612723,0.000051124294],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994147,7.782513e-7,0.00025135354,0.00009300312,0.0001732326,0.00006696433],"domain_scores_gemma":[0.9996811,0.000010502644,0.000064130625,0.00003287812,0.00018482663,0.000026537702],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003474332,0.00009634861,0.000109229775,0.00010826609,0.000027547612,0.000025937494,0.00013931833,0.00003797775,0.000061003124],"category_scores_gemma":[0.00001366728,0.00007860295,0.000045646848,0.00012339144,0.00003011822,0.00014461264,0.00000551331,0.00010581913,1.2529422e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013088341,0.000007917314,0.01200054,0.00027397898,0.00015476304,8.714454e-8,0.00018277326,0.027636861,0.0730859,0.8840028,0.00008538957,0.0025559077],"study_design_scores_gemma":[0.0006544136,0.000036555557,0.40373784,0.0004991947,0.00006441162,0.0000025018842,0.0003614918,0.5430528,0.040151805,0.010931877,0.0002852341,0.00022187353],"about_ca_topic_score_codex":0.000014139324,"about_ca_topic_score_gemma":0.000014286053,"teacher_disagreement_score":0.8730709,"about_ca_system_score_codex":0.000023345876,"about_ca_system_score_gemma":0.000022124024,"threshold_uncertainty_score":0.3205335},"labels":[],"label_agreement":null},{"id":"W4412754814","doi":"10.11159/iccste25.182","title":"Benefits of Last Planner System and Asana Integration in Improving Finish Planning","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Planner; Computer science; Engineering; Artificial intelligence","score_opus":0.00927032829785801,"score_gpt":0.20196071480083178,"score_spread":0.19269038650297377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754814","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99725956,0.00009999164,0.0005169268,0.000069640235,0.00037639678,0.00009673084,0.000034954974,0.00004233772,0.0015034837],"genre_scores_gemma":[0.9997004,0.00002007315,0.00021899755,0.000005324758,0.000017240041,0.000010849533,0.000008578644,0.000006109303,0.000012403509],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99940383,0.0000011459961,0.00028209394,0.000114003305,0.00012630627,0.000072604504],"domain_scores_gemma":[0.99974597,0.00001886515,0.00007133558,0.000026960503,0.00012071673,0.000016144671],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005113334,0.00011067913,0.00012840462,0.00018054778,0.000024508434,0.0000316488,0.000098962715,0.00005656344,0.0000041292637],"category_scores_gemma":[0.0000136559975,0.000089591806,0.00002473413,0.00013479564,0.000025595999,0.0001980689,0.0000060088596,0.00013489062,4.026907e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006409328,0.0000057646253,0.05228288,0.00084734295,0.000070794136,2.8298246e-7,0.0013617595,0.052381046,0.07281308,0.79844314,0.000014147579,0.021715641],"study_design_scores_gemma":[0.00051463104,0.00002855638,0.59622747,0.002103107,0.0000271914,0.0000065941426,0.001553716,0.34836572,0.050005008,0.0009826132,0.000013875356,0.00017150021],"about_ca_topic_score_codex":0.000024661695,"about_ca_topic_score_gemma":0.000057528625,"teacher_disagreement_score":0.79746056,"about_ca_system_score_codex":0.000028440907,"about_ca_system_score_gemma":0.000007976313,"threshold_uncertainty_score":0.3653448},"labels":[],"label_agreement":null},{"id":"W4412754856","doi":"10.11159/iccste25.258","title":"Seismic Vulnerability Assessment Using FEMA P-154 and Welded Mesh Reinforcement in Informal Settlements in Peru","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Vulnerability (computing); Informal settlements; Welding; Vulnerability assessment; Human settlement; Geology; Settlement (finance); Forensic engineering; Seismology; Reinforcement; Engineering; Computer science; Computer security; Structural engineering; Mechanical engineering; World Wide Web; Waste management; Economic growth; Medicine","score_opus":0.012701826992454202,"score_gpt":0.24750565541482067,"score_spread":0.23480382842236647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99743503,0.000013397792,0.00059650006,0.00020926673,0.00029444086,0.00016675037,0.000013211162,0.00002369627,0.0012477132],"genre_scores_gemma":[0.9995768,0.000035508438,0.00030056818,0.00002192113,0.000009544439,0.000017267068,0.0000093667595,0.0000047244253,0.000024266],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992787,0.0000016260157,0.00033742367,0.00012036088,0.0001597648,0.00010207341],"domain_scores_gemma":[0.9998073,0.000011260381,0.000050782346,0.00003129576,0.00007998416,0.000019394984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000088419976,0.00012265053,0.000122959,0.00018572636,0.00002895277,0.000042206062,0.00009826503,0.000048130645,0.00002354117],"category_scores_gemma":[0.000008698095,0.00010397779,0.00002388281,0.00014552056,0.000026184327,0.00030133777,0.000009829912,0.000182871,5.2093508e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007436609,0.000013504399,0.40885848,0.0005896683,0.000098737815,5.152045e-7,0.0013956487,0.26653358,0.040955782,0.27558035,0.000010037008,0.005889292],"study_design_scores_gemma":[0.00039192432,0.000009300738,0.427972,0.00021904164,0.0000068927516,0.0000013741363,0.0002574789,0.5667152,0.0033894908,0.0009378941,0.00001940969,0.00008002839],"about_ca_topic_score_codex":0.00007106832,"about_ca_topic_score_gemma":0.00013067531,"teacher_disagreement_score":0.30018157,"about_ca_system_score_codex":0.0000849491,"about_ca_system_score_gemma":0.000020777354,"threshold_uncertainty_score":0.42400914},"labels":[],"label_agreement":null},{"id":"W4412754898","doi":"10.11159/iccste25.248","title":"Design Of Building In Area Susceptible To Slide Failure","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.011840735047658438,"score_gpt":0.21509766776250677,"score_spread":0.20325693271484835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9849135,0.00001898893,0.01344201,0.00032989826,0.00032535163,0.00016037138,0.000013304133,0.0000399024,0.00075664814],"genre_scores_gemma":[0.99727935,0.000014905727,0.0026301325,0.000012909249,0.000010849203,0.000015954218,0.0000024413775,0.0000061868473,0.000027276836],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941754,0.000001066691,0.00025265655,0.000107899206,0.00013796796,0.00008287917],"domain_scores_gemma":[0.9997431,0.000018890976,0.000042728512,0.000031519718,0.00014364967,0.000020127849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005209369,0.00010535629,0.000120580335,0.00022335198,0.00001710608,0.000022374314,0.00015989915,0.000044031614,0.00002503676],"category_scores_gemma":[0.000017395225,0.00008723947,0.000029052548,0.00023791776,0.000017202436,0.00014669016,0.0000056029176,0.000112979054,1.225639e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037590893,0.000004058644,0.009975737,0.00015302056,0.000044711676,1.5938264e-7,0.00047080795,0.15294108,0.56802905,0.26656035,0.00004404855,0.0017394325],"study_design_scores_gemma":[0.00068260723,0.00006703621,0.09785453,0.001406673,0.00003187131,0.000004281806,0.0006928155,0.45662156,0.43158928,0.010590742,0.00015138208,0.00030722903],"about_ca_topic_score_codex":0.000016272737,"about_ca_topic_score_gemma":0.000044483466,"teacher_disagreement_score":0.30368048,"about_ca_system_score_codex":0.0000316364,"about_ca_system_score_gemma":0.000011844021,"threshold_uncertainty_score":0.3557522},"labels":[],"label_agreement":null},{"id":"W4412754899","doi":"10.11159/iccste25.001","title":"Geopolymer Concrete from Construction and Demolition Waste: A Sustainable Solution for Carbon Emission Reduction","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Demolition; Demolition waste; Geopolymer cement; Waste management; Reduction (mathematics); Geopolymer; Carbon fibers; Environmental science; Materials science; Civil engineering; Engineering; Fly ash; Composite material; Composite number","score_opus":0.006740955992634297,"score_gpt":0.2021099113869328,"score_spread":0.1953689553942985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754899","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99525756,0.00012163742,0.0020375424,0.00038135616,0.0008271929,0.00025925128,0.000046119054,0.00008346968,0.0009858607],"genre_scores_gemma":[0.9987889,0.00006929877,0.00083203334,0.0000084374105,0.00008018431,0.00004299531,0.000039081402,0.000010078739,0.00012897603],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992948,0.000001920305,0.00026069296,0.00018210517,0.00013779776,0.00012265753],"domain_scores_gemma":[0.9995615,0.000019042043,0.000080487946,0.0000380957,0.00026911375,0.0000317717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000051145078,0.00014689514,0.00013052644,0.00013665768,0.00009572194,0.000060141734,0.00008349536,0.000093708666,0.000010238711],"category_scores_gemma":[0.000019994906,0.0001266394,0.00004284019,0.00011689514,0.000060633873,0.00026984574,0.0000069793546,0.00012580161,3.8913768e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014885086,0.0000024167746,0.0027221742,0.00036662832,0.00013060516,1.206941e-7,0.00051068264,0.00084783445,0.5824401,0.40487674,0.00006814218,0.00788576],"study_design_scores_gemma":[0.001164857,0.000055643373,0.012293162,0.00061771175,0.00013088316,0.000013266646,0.0024767362,0.52146137,0.42554593,0.035601627,0.00030649683,0.00033234377],"about_ca_topic_score_codex":0.00009188446,"about_ca_topic_score_gemma":0.000007128208,"teacher_disagreement_score":0.52061355,"about_ca_system_score_codex":0.000058422753,"about_ca_system_score_gemma":0.000017640072,"threshold_uncertainty_score":0.5164204},"labels":[],"label_agreement":null},{"id":"W4412754900","doi":"10.11159/iccste25.236","title":"BIM-based Model Applied in the Analysis of Fire Simulation and Evacuation of a Building","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.012723518863840664,"score_gpt":0.23572196682768465,"score_spread":0.222998447963844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754900","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9878645,0.00002358534,0.0115206605,0.00010164672,0.000057469166,0.000112880894,0.000024724364,0.000013710119,0.00028082792],"genre_scores_gemma":[0.9993964,0.000012029959,0.0005503876,0.000009559271,0.0000044431904,0.000011155557,0.00001078922,0.0000033852332,0.0000018749847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941593,0.0000014256844,0.00027729291,0.000088771296,0.0001682102,0.00004833646],"domain_scores_gemma":[0.99969053,0.000042955475,0.00008740342,0.00003422406,0.0001368246,0.000008035796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000079127814,0.00008412921,0.00013338546,0.0002522629,0.000018925732,0.000015547977,0.000109423534,0.00004057031,0.000004865579],"category_scores_gemma":[0.000014386785,0.0000606413,0.00004242763,0.00039270864,0.000030270992,0.00010013368,0.0000028836937,0.00008135531,7.227055e-9],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019013392,0.000002842202,0.0047021317,0.000091790775,0.000072306015,1.0012573e-8,0.00031650995,0.783998,0.027030945,0.18222006,4.4192075e-7,0.0015459394],"study_design_scores_gemma":[0.00016473356,0.0000051331394,0.115957655,0.00009003411,0.00008497184,8.348994e-8,0.00013527226,0.8714483,0.009059838,0.0030092432,0.0000011329499,0.000043640022],"about_ca_topic_score_codex":0.0000146990515,"about_ca_topic_score_gemma":0.00004683525,"teacher_disagreement_score":0.17921081,"about_ca_system_score_codex":0.000015139417,"about_ca_system_score_gemma":0.000010115352,"threshold_uncertainty_score":0.24728805},"labels":[],"label_agreement":null},{"id":"W4412754950","doi":"10.11159/iccste25.315","title":"Procedure to Ensure On-Time Delivery of Materials in Multifamily Housing Construction Projects Using Just-In-Time and Kitting In Small Construction","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Transport engineering; Architectural engineering; Engineering","score_opus":0.013696741716998499,"score_gpt":0.21374784208120048,"score_spread":0.20005110036420198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754950","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.998953,0.000017366494,0.000048932212,0.000078632664,0.0003155867,0.00032121138,0.00003576118,0.0000332646,0.00019623386],"genre_scores_gemma":[0.99785703,0.000020415979,0.0020506221,0.000012904823,0.0000191614,0.000014082495,0.000008750154,0.000011406544,0.0000056296863],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99902856,0.0000046508317,0.00047436685,0.00021168428,0.00014907248,0.00013166826],"domain_scores_gemma":[0.9996622,0.000029207265,0.000104650455,0.000036673147,0.00014384183,0.000023392335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000113997026,0.00017487217,0.0002357292,0.0005260907,0.000027662347,0.00004383637,0.000111457,0.00009799456,0.000010563006],"category_scores_gemma":[0.00003692212,0.00016052298,0.000025545587,0.00033786122,0.000049443377,0.0002065281,0.0000103248785,0.00017459993,2.3266625e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014869927,0.000010649718,0.056642327,0.00042757037,0.00003301127,7.557675e-7,0.0008483319,0.0444444,0.8764038,0.018124564,0.0000011326215,0.00291475],"study_design_scores_gemma":[0.0012827149,0.000052886095,0.33856285,0.003980516,0.00003066018,0.000017102477,0.0011488474,0.23786804,0.41543964,0.0012668588,0.0000030870021,0.00034680386],"about_ca_topic_score_codex":0.00009289722,"about_ca_topic_score_gemma":0.0001540909,"teacher_disagreement_score":0.46096417,"about_ca_system_score_codex":0.00008527943,"about_ca_system_score_gemma":0.000029730616,"threshold_uncertainty_score":0.6545937},"labels":[],"label_agreement":null},{"id":"W4412755054","doi":"10.11159/iccste25.326","title":"Development of an Integrated Enterprise Asset Management System for Enhancing Industrial Resources Lifecycle in the Construction Industry","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"System lifecycle; Asset (computer security); Business; Asset management; Application lifecycle management; Enterprise life cycle; Process management; Computer science; Engineering management; Product lifecycle; Engineering; Finance; Computer security; New product development","score_opus":0.0129099603932208,"score_gpt":0.2189082281786848,"score_spread":0.205998267785464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412755054","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9963763,0.000009625061,0.0020241993,0.00006974473,0.00055933784,0.0002720836,0.00003154662,0.00004056144,0.0006166462],"genre_scores_gemma":[0.9973181,0.0000044015364,0.0025505568,0.0000063527864,0.000028260778,0.000056972356,0.000018783992,0.0000061931164,0.000010379194],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99919766,0.0000032856583,0.00040322257,0.00012585807,0.00018234717,0.000087635875],"domain_scores_gemma":[0.9996935,0.000021191498,0.000098007185,0.00004311524,0.00012755087,0.000016638822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00014069388,0.00012294241,0.00012694707,0.00018064339,0.000049366918,0.000045851957,0.00021826706,0.000100596866,0.0000053628582],"category_scores_gemma":[0.00001086166,0.00008745892,0.00003503884,0.00019549482,0.00003027641,0.00017577286,0.000005829998,0.00021854887,4.8798757e-8],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048792723,0.000054813598,0.025229082,0.0022742462,0.0006028786,0.0000010225147,0.009026136,0.02773032,0.11785057,0.7007921,0.000052140254,0.11589877],"study_design_scores_gemma":[0.0043753986,0.00013868048,0.2525875,0.0066194623,0.00023459183,0.000029147493,0.05784056,0.2617423,0.40957925,0.0033823382,0.0026334731,0.0008373077],"about_ca_topic_score_codex":0.000010883277,"about_ca_topic_score_gemma":0.00010138978,"teacher_disagreement_score":0.69740975,"about_ca_system_score_codex":0.000058152786,"about_ca_system_score_gemma":0.000018682309,"threshold_uncertainty_score":0.3566471},"labels":[],"label_agreement":null},{"id":"W4412755064","doi":"10.11159/iccste25.189","title":"Reducing Subcontractor Progress Monitoring Time on Multifamily Building Finishes Using a BIM-Based","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Computer science; Architectural engineering; Systems engineering; Engineering; Operations management","score_opus":0.013083728300053235,"score_gpt":0.234558365395332,"score_spread":0.22147463709527876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412755064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99737257,0.00005185128,0.00070401665,0.00017178242,0.00096766156,0.00015947742,0.000025781806,0.00013157609,0.00041529987],"genre_scores_gemma":[0.9975966,0.000010482593,0.0022468837,0.000012174241,0.00007375644,0.000018576806,0.0000052866376,0.000015924345,0.000020272462],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991284,0.0000018686596,0.00030062688,0.00019089985,0.00023707795,0.00014113163],"domain_scores_gemma":[0.99959457,0.000034536064,0.0000861714,0.000052536845,0.00019829921,0.000033878714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00005786057,0.00019216197,0.00015745635,0.00020061905,0.00008076124,0.00009547684,0.00019434227,0.00007520499,0.000017815923],"category_scores_gemma":[0.000023777431,0.00015851301,0.00006890945,0.00018175416,0.00004337591,0.00023418647,0.000005557842,0.00021134022,3.9391753e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011954884,0.000018269113,0.029253203,0.00037015323,0.00019446904,8.8241524e-7,0.00031653343,0.1438445,0.6909032,0.12281156,0.000014069689,0.012153621],"study_design_scores_gemma":[0.00044324071,0.000027229004,0.0965698,0.0012825333,0.000038812224,0.0000023065245,0.00008515476,0.6508783,0.24957651,0.0008387314,0.00004098074,0.00021641015],"about_ca_topic_score_codex":0.000013458401,"about_ca_topic_score_gemma":0.0000024767107,"teacher_disagreement_score":0.50703377,"about_ca_system_score_codex":0.00007082872,"about_ca_system_score_gemma":0.000022325441,"threshold_uncertainty_score":0.6463973},"labels":[],"label_agreement":null},{"id":"W4412819532","doi":"10.1007/978-3-031-89033-8_3","title":"Building Software","year":2025,"lang":"en","type":"book-chapter","venue":"CMS/CAIMS books in mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science","score_opus":0.012498499634262968,"score_gpt":0.2184220625838103,"score_spread":0.20592356294954733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412819532","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000043169755,0.00094840355,0.09288415,0.000013937232,0.0010201166,0.00027732635,0.00002974061,0.000539,0.9042441],"genre_scores_gemma":[0.0006468936,0.00031800498,0.13001722,0.00006757962,0.00028144268,0.000063936306,0.000029027262,0.00018159354,0.8683943],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988225,0.000004113132,0.0005546365,0.00021360401,0.00020043211,0.0002047322],"domain_scores_gemma":[0.999279,0.00011272524,0.00009073279,0.00041232837,0.000059445716,0.000045721026],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00010741447,0.00036535182,0.00043262687,0.00032987262,0.000044185337,0.000060952767,0.00022612116,0.00047521378,0.00028660218],"category_scores_gemma":[0.000041064122,0.00038563504,0.00013686056,0.00003890433,0.00006233856,0.00006680064,0.000048576705,0.0005935807,0.00010045789],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011495839,0.0000057492716,0.0000035938021,0.00083278853,0.000060899216,0.000010331055,0.00017657288,0.00031320818,0.00004482515,0.95145583,0.008246389,0.038848657],"study_design_scores_gemma":[0.00018825148,0.000010832667,0.0000018178204,0.002378913,0.00007290237,0.000026980519,0.00003759308,0.0074654473,0.00036071296,0.7880768,0.2008331,0.00054665236],"about_ca_topic_score_codex":0.0000014487089,"about_ca_topic_score_gemma":0.000016482996,"teacher_disagreement_score":0.1925867,"about_ca_system_score_codex":0.00019796475,"about_ca_system_score_gemma":0.00005215984,"threshold_uncertainty_score":0.9998596},"labels":[],"label_agreement":null},{"id":"W4412870792","doi":"10.24908/pceea.2025.19671","title":"Transit Engineering &amp; Planning: Needs and Perspectives in Canada","year":2025,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"York University","funders":"York University","keywords":"Transit (satellite); Business; Transport engineering; Engineering; Public transport","score_opus":0.005622392216677101,"score_gpt":0.17772061192513053,"score_spread":0.17209821970845343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412870792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98695546,0.0010240664,0.00015219174,0.002833075,0.0017829326,0.00025351625,0.000015336673,0.00009655267,0.0068868594],"genre_scores_gemma":[0.9989738,0.000019982897,0.00029469212,0.000059544484,0.00004733479,0.000034358203,0.0000028051156,0.00001670996,0.0005508025],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99931383,0.0000024186622,0.00022157877,0.00010815528,0.00014054822,0.00021346165],"domain_scores_gemma":[0.99959254,0.000034356923,0.000054377437,0.000056758257,0.00017294295,0.00008902105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001260074,0.00013050903,0.00013948952,0.00049811613,0.0000583642,0.000055082677,0.00012560835,0.00009782609,0.000010573028],"category_scores_gemma":[0.00021256733,0.0001425503,0.000030952004,0.00074289396,0.000007939047,0.000149378,0.000006984369,0.00024080033,5.4341825e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006621965,0.000035117107,0.6604866,0.0011170796,0.00033772225,2.423195e-7,0.011082223,0.15827022,0.0107438015,0.10204266,0.04971772,0.0061600343],"study_design_scores_gemma":[0.0004326739,0.0000060350444,0.85393083,0.0006901612,0.00006815132,0.000008084343,0.0065703252,0.047433022,0.003196846,0.00031629903,0.086776584,0.00057099457],"about_ca_topic_score_codex":0.4398491,"about_ca_topic_score_gemma":0.8145761,"teacher_disagreement_score":0.37472698,"about_ca_system_score_codex":0.0040867203,"about_ca_system_score_gemma":0.0010343944,"threshold_uncertainty_score":0.9997364},"labels":[],"label_agreement":null},{"id":"W4412916416","doi":"10.5614/jts.2025.32.1.10","title":"Systematic Literature Riview: Peranan metode BIM dalam Integrated Project Delivery (IPD) untuk Mengoptimalkan Konstruktabilitas Proyek","year":2025,"lang":"id","type":"article","venue":"Jurnal Teknik Sipil","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Operating system; Computer science","score_opus":0.006931432229120676,"score_gpt":0.22900793349365,"score_spread":0.22207650126452932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412916416","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.519527,0.32114425,0.022926806,0.0027649475,0.023746984,0.017520046,0.001363841,0.004103299,0.08690279],"genre_scores_gemma":[0.9714783,0.0074804104,0.005205589,0.0002887496,0.0006995632,0.0009486129,0.00032008288,0.0002191003,0.013359617],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.99475074,0.00075638655,0.0020053212,0.0009169887,0.00068668486,0.00088389503],"domain_scores_gemma":[0.9970619,0.00033299462,0.0004131092,0.00100966,0.0009497649,0.00023256837],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00094710913,0.0010740176,0.0015129459,0.0011782561,0.0004975145,0.00096593634,0.00068170123,0.00076384516,0.00018547628],"category_scores_gemma":[0.00049063587,0.0008779785,0.00070424983,0.0030061745,0.0002597182,0.00083469425,0.000118384596,0.00199404,0.00014028196],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016087738,0.0026046962,0.005836298,0.47206926,0.018398143,0.0006206698,0.028598482,0.004530355,0.051433243,0.19877753,0.04731748,0.16820507],"study_design_scores_gemma":[0.014513824,0.0029167149,0.0067817625,0.4126516,0.012391588,0.003328211,0.04303643,0.27759442,0.053664282,0.004780872,0.15745951,0.010880795],"about_ca_topic_score_codex":0.00009960575,"about_ca_topic_score_gemma":0.00015617357,"teacher_disagreement_score":0.45195124,"about_ca_system_score_codex":0.0008867908,"about_ca_system_score_gemma":0.00086156005,"threshold_uncertainty_score":0.9993671},"labels":[],"label_agreement":null},{"id":"W4413135109","doi":"10.1139/dsa-2025-0001","title":"AIoT-powered drones in the construction industry: a review","year":2025,"lang":"en","type":"review","venue":"Drone Systems and Applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scopus; Drone; Nexus (standard); China; Leverage (statistics); Construction industry; Web of science; Systematic review; Engineering; Knowledge management; Data science; Political science; Computer science; Construction engineering; Artificial intelligence","score_opus":0.01695594502951816,"score_gpt":0.2791377002637914,"score_spread":0.2621817552342733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413135109","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[3.129136e-7,0.987746,0.0017134261,0.000058804322,0.0002690243,0.0021464035,0.0000785687,0.000095243624,0.007892194],"genre_scores_gemma":[0.000041854848,0.9942953,0.000035833214,0.000023932937,0.00017684579,0.0050095185,0.00013440025,0.000015997573,0.0002663166],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99887705,0.00009409059,0.00057713897,0.00021954114,0.00010266732,0.00012951934],"domain_scores_gemma":[0.99937236,0.000082510276,0.000120095945,0.00036242965,0.000031982254,0.000030626717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020222922,0.00023719993,0.0006878016,0.00014871701,0.000091841735,0.00007285899,0.00016789287,0.00037311373,0.000015674545],"category_scores_gemma":[0.000008238199,0.00016905495,0.00009451807,0.00069995323,0.000058471433,0.000054590666,0.000014118772,0.00055800506,0.00002242532],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.8989906e-8,0.0000059264116,0.0000017101058,0.043409795,0.000025089945,2.4596673e-7,0.000011148818,0.0000036842262,8.281974e-8,0.04817075,0.0019807217,0.9063908],"study_design_scores_gemma":[0.00003892514,0.0000026932253,0.0000017904907,0.021465866,0.00020967028,0.00012151398,0.000117807256,0.000039413975,4.2157236e-8,0.00011393983,0.97773826,0.00015008997],"about_ca_topic_score_codex":0.00003519065,"about_ca_topic_score_gemma":0.000013985399,"teacher_disagreement_score":0.97575754,"about_ca_system_score_codex":0.000061684594,"about_ca_system_score_gemma":0.000075281416,"threshold_uncertainty_score":0.6893861},"labels":[],"label_agreement":null},{"id":"W4413185976","doi":"10.1139/cjce-2025-0139","title":"Elevating immersive construction training with high-fidelity haptic feedback for human–robot collaboration","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Haptic technology; Computer science; Fidelity; Training (meteorology); Virtual reality; Human–robot interaction; Human–computer interaction; High fidelity; Robot; Simulation; Engineering; Artificial intelligence","score_opus":0.008221356288865103,"score_gpt":0.1982541311083901,"score_spread":0.190032774819525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413185976","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16809559,0.0005669564,0.82727957,0.00020500972,0.0020406193,0.00021888957,0.0000212541,0.00005129761,0.0015208245],"genre_scores_gemma":[0.99319345,0.000004349483,0.006520873,0.00002558246,0.00018931377,0.000011229731,0.000007909837,0.00002195299,0.000025365756],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991943,0.0000084557105,0.00038571228,0.00009086116,0.00008712056,0.00023352912],"domain_scores_gemma":[0.99923223,0.000048819937,0.00009788974,0.0000820821,0.0003798323,0.00015913919],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015971735,0.00014369367,0.00021457022,0.0004367308,0.00013962088,0.00009529418,0.00008593769,0.000087923305,0.000047362933],"category_scores_gemma":[0.000075325726,0.00015067577,0.000053442607,0.00039101669,0.000037946193,0.00029647473,0.0000017509657,0.00022125588,5.436447e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018156083,0.0000028165657,0.00050752715,0.00022728942,0.00029720634,0.000012513076,0.000999537,0.8931323,0.044095982,0.052398704,0.00084100186,0.007466909],"study_design_scores_gemma":[0.015005319,0.0014413815,0.025439512,0.008658468,0.0015376194,0.0021183984,0.042253464,0.751239,0.08588468,0.022390826,0.039980423,0.004050877],"about_ca_topic_score_codex":0.00016469107,"about_ca_topic_score_gemma":0.025525065,"teacher_disagreement_score":0.82509786,"about_ca_system_score_codex":0.00034761365,"about_ca_system_score_gemma":0.00048156414,"threshold_uncertainty_score":0.9922566},"labels":[],"label_agreement":null},{"id":"W4413186082","doi":"10.55016/ojs/cdm.v5i2.61945","title":"Polytopes derived from sporadic simple groups","year":2010,"lang":"en","type":"article","venue":"Contributions to Discrete Mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Simple (philosophy); Combinatorics; Mathematics; Polytope","score_opus":0.006054601706075786,"score_gpt":0.23153755397967007,"score_spread":0.2254829522735943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413186082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6538861,0.00006429182,0.3414019,0.00030435232,0.00059801573,0.00023359155,0.00066078524,0.00042571482,0.002425272],"genre_scores_gemma":[0.9891693,0.0000064229994,0.0102307545,0.000051499486,0.00023519761,0.00005590449,0.00016640392,0.000024665665,0.000059835296],"study_design_codex":"bench_or_experimental","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992311,0.000008389581,0.00028097292,0.00013244712,0.00012344288,0.00022366992],"domain_scores_gemma":[0.9992984,0.00007337365,0.00003509695,0.00033857566,0.000105079824,0.00014945581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000076494245,0.00015636122,0.00019220015,0.000078194316,0.00013206161,0.00009127814,0.00015940217,0.00011628114,0.00057889865],"category_scores_gemma":[0.00015365527,0.00014455472,0.00007362117,0.0001923693,0.000051079773,0.00012763604,0.000026029395,0.00023052457,0.000339398],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010105181,0.0000744811,0.0006465903,0.000051250863,0.00017931948,0.0000063256366,0.0016837692,0.0006013101,0.50968874,0.4636499,0.007960227,0.015447978],"study_design_scores_gemma":[0.0022441905,0.00011391362,0.015322697,0.0001825838,0.0004009745,0.00009984616,0.0026829536,0.20030676,0.28322485,0.38579583,0.10746275,0.0021626502],"about_ca_topic_score_codex":0.00002351155,"about_ca_topic_score_gemma":0.00015479342,"teacher_disagreement_score":0.33528325,"about_ca_system_score_codex":0.000045780864,"about_ca_system_score_gemma":0.000021255179,"threshold_uncertainty_score":0.63385344},"labels":[],"label_agreement":null},{"id":"W4413186811","doi":"10.1139/cjce-2025-0024","title":"State-of-the-practice in alternative delivery of transportation infrastructure construction projects in Canada","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Transportation infrastructure; Integrated project delivery; Transport engineering; State (computer science); Engineering; Construction management; State highway; Civil engineering; Business; Construction engineering; Computer science","score_opus":0.0026604116326894686,"score_gpt":0.16750049037015063,"score_spread":0.16484007873746118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413186811","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99356794,0.00058413856,0.0036595855,0.000046945144,0.0014527872,0.000084580955,0.000025520205,0.0000029140028,0.0005755913],"genre_scores_gemma":[0.9995814,0.000043932327,0.00034029898,0.000009786131,0.00001329328,0.0000015483953,0.0000010360944,0.000006387341,0.000002342303],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993045,0.000015013226,0.00042176104,0.00004438374,0.00010127704,0.00011308357],"domain_scores_gemma":[0.9995881,0.000051994062,0.000109938046,0.00005699277,0.00014246284,0.000050554772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000080818216,0.00007771487,0.00015303229,0.00041936515,0.000009521257,0.0000058060905,0.00009554923,0.00003476988,0.000011041734],"category_scores_gemma":[0.0000663557,0.0000759134,0.000031101554,0.0004797019,0.000020548812,0.00019953764,0.0000011272238,0.00026657723,2.3116144e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007624413,0.0000011780643,0.024795309,0.00008644441,0.000033816585,0.000014307268,0.0006781363,0.96373373,0.00079974165,0.0006356009,0.00008039026,0.009133732],"study_design_scores_gemma":[0.0024539258,0.000065331784,0.76373065,0.0035108328,0.00010983013,0.00021386312,0.0059034596,0.16470264,0.05020103,0.0017273673,0.0068328655,0.0005482168],"about_ca_topic_score_codex":0.4208805,"about_ca_topic_score_gemma":0.9948777,"teacher_disagreement_score":0.7990311,"about_ca_system_score_codex":0.0006127632,"about_ca_system_score_gemma":0.0021706447,"threshold_uncertainty_score":0.5829759},"labels":[],"label_agreement":null},{"id":"W4413217569","doi":"10.1108/ecam-12-2024-1662","title":"Minimizing personnel assignment costs in the layout phase of steel component construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Flexibility (engineering); Salary; Factory (object-oriented programming); Total cost; Operations research; Computer science; Function (biology); Duration (music); Reduction (mathematics); Cost reduction; Assignment problem; Integer programming; Component (thermodynamics); Operations management; Reliability engineering; Mathematical optimization; Engineering; Mathematics; Business","score_opus":0.007146667112424481,"score_gpt":0.21766574123052077,"score_spread":0.21051907411809628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413217569","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82715315,0.0002803956,0.16272208,0.00023421773,0.0022740536,0.00068574335,0.000013883448,0.00028563754,0.0063508707],"genre_scores_gemma":[0.9865524,0.00003768185,0.013163224,0.000029846407,0.00005438421,0.0001023704,0.000015721193,0.000015555866,0.000028800025],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99871,0.000049851926,0.00049750373,0.00022810067,0.00025369902,0.00026084788],"domain_scores_gemma":[0.999532,0.00007206074,0.0000658855,0.00026240174,0.000031984273,0.00003567971],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001923404,0.0002455286,0.00023658836,0.00056734186,0.00008522891,0.00005251707,0.00020208811,0.000066825865,0.000029619932],"category_scores_gemma":[0.000011181135,0.00021409905,0.000101107966,0.0005654587,0.00011350401,0.000105228784,0.000036788813,0.00029832093,0.0000037203815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000071698174,0.00007379512,0.0009063438,0.0005202078,0.00031870615,0.000011532823,0.0014766314,0.31444848,0.00989861,0.11825726,0.00015831155,0.55385846],"study_design_scores_gemma":[0.011843104,0.0002908466,0.032310236,0.002229556,0.000510074,0.00074861135,0.041699592,0.8645374,0.02248816,0.0021298104,0.019362513,0.0018500822],"about_ca_topic_score_codex":0.000020704872,"about_ca_topic_score_gemma":0.00001028767,"teacher_disagreement_score":0.55200833,"about_ca_system_score_codex":0.00023340953,"about_ca_system_score_gemma":0.000010976481,"threshold_uncertainty_score":0.8730706},"labels":[],"label_agreement":null},{"id":"W4413366889","doi":"10.1016/j.aei.2025.103778","title":"Leveraging linked data for space constraints checking of mobile cranes in modular construction assembly lookahead planning","year":2025,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Worldwide Universities Network; University of Auckland","keywords":"Modular design; Computer science; Modular construction; Space (punctuation); Systems engineering; Distributed computing; Engineering drawing; Theoretical computer science; Engineering; Programming language; Operating system","score_opus":0.013130944557142955,"score_gpt":0.25290981802778956,"score_spread":0.2397788734706466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413366889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27639803,0.0002833459,0.72147715,0.0000060393136,0.00068308145,0.0002860755,0.0000263434,0.00020027242,0.00063962414],"genre_scores_gemma":[0.86463463,0.000048390564,0.13512614,0.000007498711,0.000023349232,0.000054297834,0.00007908385,0.000017535614,0.00000905767],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989301,0.000004006269,0.0006275831,0.00010502871,0.000102369835,0.0002308987],"domain_scores_gemma":[0.99937814,0.0001017676,0.0000847427,0.00033273775,0.00007228937,0.000030314955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00017002769,0.00017743107,0.00027174482,0.00031946553,0.000036091515,0.000030221257,0.00019847677,0.00011029903,0.0000030896779],"category_scores_gemma":[0.00007741218,0.00020701996,0.000037296748,0.0003172539,0.000045362074,0.0006477407,0.000037197387,0.00020550913,8.616033e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006356469,0.0000044093294,0.00037092846,0.0007138385,0.000036411755,3.0688926e-7,0.00055046426,0.93786836,0.0075961133,0.003101943,0.000017034348,0.049733814],"study_design_scores_gemma":[0.0006821596,0.000014244182,0.0005154669,0.0006538004,0.000018323977,0.000011018588,0.0015816719,0.98435855,0.008593091,0.00017269875,0.0032043394,0.00019460927],"about_ca_topic_score_codex":0.0000027603146,"about_ca_topic_score_gemma":0.0000017779795,"teacher_disagreement_score":0.58823663,"about_ca_system_score_codex":0.00008482796,"about_ca_system_score_gemma":0.000037480313,"threshold_uncertainty_score":0.8442029},"labels":[],"label_agreement":null},{"id":"W4413515835","doi":"10.1139/cjce-2024-0579","title":"Evaluating advanced building insulation materials: a flexible-weighting multi-objective optimization approach","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Laurentian University; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"FortisBC; Mitacs","keywords":"Weighting; Structural engineering; Computer science; Engineering; Reliability engineering","score_opus":0.015307732832724106,"score_gpt":0.24551753361111506,"score_spread":0.23020980077839096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413515835","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07325364,0.0008369616,0.92261946,0.000013963139,0.001587106,0.00012070596,0.0000049028063,0.00008445314,0.0014787859],"genre_scores_gemma":[0.891135,0.000014128116,0.108643495,0.000010016012,0.00013031895,0.000010001115,0.0000051153083,0.000026948603,0.000024974104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990445,0.000024104369,0.0004696295,0.00010823437,0.00011590845,0.00023763883],"domain_scores_gemma":[0.9993891,0.000036647783,0.00010522265,0.00009457075,0.0002351836,0.00013925035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033425746,0.00015925974,0.00021031075,0.00075039954,0.00010572729,0.00011094267,0.00011665998,0.00010297712,0.000050331164],"category_scores_gemma":[0.0002159944,0.00017564958,0.000055938748,0.00048274893,0.000014765634,0.00042851,0.0000055572414,0.00023319556,5.388609e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004027961,0.0000021743517,0.00008638711,0.00007160096,0.00004800096,0.0000018800125,0.00021354565,0.9632807,0.029584967,0.0013013757,0.000010844536,0.005394523],"study_design_scores_gemma":[0.00046620079,0.000018079929,0.00078602135,0.0003486624,0.000032432297,0.000042155938,0.00016405483,0.98828185,0.009476256,0.00006338589,0.00016165843,0.00015924349],"about_ca_topic_score_codex":0.00007909053,"about_ca_topic_score_gemma":0.00053903763,"teacher_disagreement_score":0.81788135,"about_ca_system_score_codex":0.00043212468,"about_ca_system_score_gemma":0.00025298144,"threshold_uncertainty_score":0.7162782},"labels":[],"label_agreement":null},{"id":"W4413604232","doi":"10.64628/aam.pv6qmexaa","title":"Artificial intelligence can support architects but lacks empathy and ethics","year":2023,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Empathy; Psychology; Cognitive science; Sociology; Social psychology","score_opus":0.07711643299813538,"score_gpt":0.2917643723101777,"score_spread":0.21464793931204235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413604232","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3831865,0.00019329975,0.56834376,0.0035399345,0.0117951445,0.0007708804,0.00027200326,0.0040919,0.027806567],"genre_scores_gemma":[0.9962741,0.00027518574,0.0017300291,0.000084371946,0.00028325937,0.0000477792,0.000074166615,0.000043787593,0.0011873253],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99906665,0.000025349611,0.00029746516,0.0002637693,0.00017030163,0.00017647484],"domain_scores_gemma":[0.99951327,0.000083844854,0.00003158811,0.00022952055,0.0000619387,0.00007984345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020524269,0.00019680361,0.00017605923,0.00014988023,0.000056571567,0.00010642579,0.00011798352,0.00046002676,0.00014143782],"category_scores_gemma":[0.00006253789,0.00019622369,0.00005446703,0.000088543195,0.000083214385,0.000022661081,0.0001281686,0.0014298195,0.00008619984],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021958553,0.000025314874,0.00066960143,0.0013496552,0.00023799425,0.000051919556,0.018115312,0.05520873,0.0013178124,0.12623657,0.0033968205,0.79336834],"study_design_scores_gemma":[0.00009005048,0.00014287564,0.0031837774,0.0005518565,0.00016299699,0.00016604549,0.011534256,0.21811852,0.087836556,0.6715564,0.004204814,0.0024518282],"about_ca_topic_score_codex":0.0003755288,"about_ca_topic_score_gemma":0.0039437683,"teacher_disagreement_score":0.7909165,"about_ca_system_score_codex":0.000040195788,"about_ca_system_score_gemma":0.000108392254,"threshold_uncertainty_score":0.800177},"labels":[],"label_agreement":null},{"id":"W4413882907","doi":"10.1016/j.autcon.2025.106496","title":"AI applications for structural design automation","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Automation; Engineering; Systems engineering; Computer science; Software engineering; Manufacturing engineering; Engineering drawing; Mechanical engineering","score_opus":0.008366985701120627,"score_gpt":0.25174391815064023,"score_spread":0.2433769324495196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413882907","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010234947,0.00010749164,0.98425925,0.0003294802,0.0012968318,0.001108749,0.000013066243,0.0009359222,0.001714272],"genre_scores_gemma":[0.91382784,0.000021676395,0.08422716,0.00012441058,0.000110387926,0.0014867332,0.00009827399,0.000019326808,0.00008418205],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990505,0.000038829767,0.00044759305,0.00019551568,0.00010165361,0.00016588409],"domain_scores_gemma":[0.999493,0.00009837237,0.000064614534,0.00017405393,0.00014410604,0.000025873069],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015407705,0.00014783586,0.00014663779,0.00047659216,0.00014728557,0.00008505493,0.00008788788,0.00016267235,0.000043457447],"category_scores_gemma":[0.00002833287,0.00016659895,0.000053223048,0.0006269821,0.00006372946,0.0004758261,0.0000066214216,0.00012762548,0.0000157548],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019529552,0.000009203071,0.0017260019,0.00016938653,0.000041671967,1.04907414e-7,0.00012377133,0.064797275,0.0036878122,0.3105692,0.002688098,0.61616796],"study_design_scores_gemma":[0.00066947384,0.000011922272,0.00520966,0.000050214512,0.00002446636,0.000016580652,0.0001645614,0.8967826,0.008243908,0.08147741,0.0071555655,0.00019368305],"about_ca_topic_score_codex":0.000007591617,"about_ca_topic_score_gemma":0.000018160532,"teacher_disagreement_score":0.9035929,"about_ca_system_score_codex":0.0002362852,"about_ca_system_score_gemma":0.00006933435,"threshold_uncertainty_score":0.6793708},"labels":[],"label_agreement":null},{"id":"W4413925809","doi":"10.1109/icra55743.2025.11127354","title":"Unveiling the Depths: A Multi-Modal Fusion Framework for Challenging Scenarios","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"National Natural Science Foundation of China","keywords":"Modal; Computer science; Fusion; Sensor fusion; Geology; Artificial intelligence; Materials science","score_opus":0.01432126376802112,"score_gpt":0.2567118489332794,"score_spread":0.2423905851652583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413925809","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066329828,0.0011574457,0.9865154,0.0006560443,0.0009775333,0.0002205326,0.0000013080747,0.00032323142,0.0035154892],"genre_scores_gemma":[0.96883523,0.000080284604,0.029808315,0.0003205825,0.000104070896,0.00008331495,0.0000023895236,0.000011977394,0.0007538293],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995988,0.000006597002,0.0001255718,0.00009463193,0.00004659772,0.00012778898],"domain_scores_gemma":[0.99970824,0.00010431102,0.000009978502,0.0001271481,0.000034055694,0.00001625144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006981174,0.00008168779,0.00006795994,0.000053788823,0.00016025806,0.000038605023,0.000079956575,0.00009430743,0.000087903616],"category_scores_gemma":[0.000040362233,0.000057071506,0.000055529228,0.00012707761,0.0000153472,0.00005318077,0.000012266949,0.00014927765,0.000012551443],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023502425,0.000032257634,0.000394064,0.00018247553,0.0001249177,5.064788e-7,0.0010834278,0.062053114,0.0043512313,0.5896056,0.0056223837,0.33652645],"study_design_scores_gemma":[0.00024934436,0.000007114381,0.0002951357,0.00010304802,0.000014912147,0.000001775615,0.0011908051,0.9672234,0.0038977556,0.0047415528,0.022168623,0.0001065381],"about_ca_topic_score_codex":0.000007538103,"about_ca_topic_score_gemma":0.00003408344,"teacher_disagreement_score":0.96220225,"about_ca_system_score_codex":0.000031320502,"about_ca_system_score_gemma":0.000011935523,"threshold_uncertainty_score":0.23273085},"labels":[],"label_agreement":null},{"id":"W4414113226","doi":"10.1016/j.autcon.2025.106505","title":"Dual-stream transformer-based activity classification for off-site construction productivity analysis","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Forestry Promotion Institute; Korea Agency for Infrastructure Technology Advancement; Korea Forest Service; Ministry of Land, Infrastructure and Transport","keywords":"Productivity; Production (economics); Automation; Statistical analysis; Construction industry","score_opus":0.010258749328550172,"score_gpt":0.24494372053748803,"score_spread":0.23468497120893786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414113226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54233396,0.000054275606,0.45256463,0.00037700226,0.0012832041,0.0006472427,0.00005905139,0.0005803293,0.002100317],"genre_scores_gemma":[0.9882473,0.00003413994,0.010880495,0.000017006045,0.00008475301,0.00043583597,0.00022628265,0.000017961027,0.000056236946],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844396,0.00009187709,0.0005721642,0.00043714853,0.0002027387,0.00025211897],"domain_scores_gemma":[0.9991059,0.00012312716,0.00016039483,0.00032492523,0.00024054534,0.000045119767],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00032320904,0.00025638018,0.00034668826,0.0013987247,0.00019322668,0.0000987013,0.00007060033,0.00027410602,0.00006055408],"category_scores_gemma":[0.000067746085,0.00029398678,0.00020369585,0.002372509,0.00018100426,0.0007258357,0.000003794584,0.00022419146,0.000007934734],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000102822305,0.000070738206,0.034291226,0.00020876167,0.0002883193,2.3600754e-7,0.00011675632,0.030380366,0.02970553,0.021868015,0.00017058942,0.88279665],"study_design_scores_gemma":[0.0012020038,0.000033066593,0.16629049,0.00006170537,0.0004152016,0.000011890785,0.0002445669,0.7760777,0.050550137,0.0025891692,0.002179987,0.0003441033],"about_ca_topic_score_codex":0.000047468446,"about_ca_topic_score_gemma":0.000445575,"teacher_disagreement_score":0.88245255,"about_ca_system_score_codex":0.00042646815,"about_ca_system_score_gemma":0.00013814513,"threshold_uncertainty_score":0.99995124},"labels":[],"label_agreement":null},{"id":"W4414318939","doi":"10.1515/rams-2025-0131","title":"Innovative optimization of seashell ash-based lightweight foamed concrete: Enhancing physicomechanical properties through ANN-GA hybrid approach","year":2025,"lang":"en","type":"article","venue":"REVIEWS ON ADVANCED MATERIALS SCIENCE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Ultimate tensile strength; Curing (chemistry); Porosity; Compressive strength; Flexural strength; Cement; Absorption of water; Response surface methodology","score_opus":0.017787934557885528,"score_gpt":0.2539344024589038,"score_spread":0.2361464679010183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414318939","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086777136,0.002369636,0.90271014,0.00006852428,0.001477232,0.0014039772,0.000027327025,0.00024296358,0.0049230466],"genre_scores_gemma":[0.9217025,0.0010277962,0.07673117,0.00017758532,0.000045641886,0.00022967998,0.000017833978,0.000016577616,0.000051241255],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985452,0.00007375021,0.00060568517,0.00032704542,0.00022813487,0.00022016556],"domain_scores_gemma":[0.9991684,0.00002466944,0.00018541502,0.00030742428,0.00028348246,0.000030611973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045428882,0.00020251932,0.0004647201,0.00013372343,0.0001150652,0.000067637935,0.00025496614,0.000041095547,0.000037515867],"category_scores_gemma":[0.00017692042,0.000153799,0.00004345325,0.0011441841,0.00023444447,0.00054685964,0.000030035619,0.000086356275,0.000010238589],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022422691,0.000010605632,5.8576353e-7,0.00045961604,0.000004577712,1.2040907e-7,0.000039657265,0.026214238,0.9586084,0.008662232,0.00003168049,0.0059458576],"study_design_scores_gemma":[0.00021630508,0.000041404386,0.000002789368,0.00071664207,0.000009455526,0.0000010439547,0.000030707488,0.020218285,0.9768012,0.00017970281,0.0016300549,0.00015238549],"about_ca_topic_score_codex":0.0000018346076,"about_ca_topic_score_gemma":2.2365481e-7,"teacher_disagreement_score":0.83492535,"about_ca_system_score_codex":0.00011847742,"about_ca_system_score_gemma":0.0001183497,"threshold_uncertainty_score":0.62717414},"labels":[],"label_agreement":null},{"id":"W4414354050","doi":"10.1061/jladah.ladr-1335","title":"Framework for 4D Simulation Collaboration in Construction Delay Claims","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Negotiation; Scheme (mathematics); Construction management; Construction industry; Key (lock)","score_opus":0.004342310570247853,"score_gpt":0.23480132422669123,"score_spread":0.23045901365644336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414354050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31532824,0.0012449302,0.681425,0.00018477648,0.0014608782,0.00015464646,0.0000058131045,0.00003947681,0.00015624797],"genre_scores_gemma":[0.957576,0.00039354665,0.041866064,0.0000060194684,0.00012511178,0.000014302174,0.000003819262,0.000009652074,0.0000055338996],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99905616,0.00002144857,0.00054686714,0.00012770659,0.00010040481,0.00014741831],"domain_scores_gemma":[0.9995416,0.00011781369,0.00010627286,0.00005954039,0.00012790336,0.00004690902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021594089,0.00013929365,0.00022452348,0.0006090747,0.000067809684,0.00011203608,0.000034272576,0.00019065036,0.0000021488618],"category_scores_gemma":[0.000078436555,0.00014509863,0.0000436296,0.0004783772,0.00007191767,0.00052060105,0.00000738117,0.00027342036,9.2868746e-8],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010807961,0.000012075185,0.0030922205,0.00016500945,0.000027968545,0.0000019366223,0.00012816433,0.6110074,0.00058944564,0.32985982,0.00001925197,0.054988664],"study_design_scores_gemma":[0.0011805056,0.00007372832,0.0037035092,0.0005239705,0.000033996563,0.00015328752,0.0016404161,0.9740125,0.00033760883,0.015271496,0.0028858536,0.00018310579],"about_ca_topic_score_codex":0.000008280127,"about_ca_topic_score_gemma":0.000029784462,"teacher_disagreement_score":0.6422477,"about_ca_system_score_codex":0.0001538172,"about_ca_system_score_gemma":0.00005544791,"threshold_uncertainty_score":0.5916951},"labels":[],"label_agreement":null},{"id":"W4414528238","doi":"10.24928/2025/0137","title":"Perceptions of Robotic Inspections for Confined Spaces in Lean Construction: a Qualitative Study","year":2025,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Government of Canada","keywords":"Qualitative research; Perception; Qualitative analysis; Perspective (graphical); Process (computing)","score_opus":0.02037640510702035,"score_gpt":0.2946347044283448,"score_spread":0.2742582993213244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414528238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8690319,0.000024438741,0.1231451,0.0005233684,0.0035805071,0.0010972291,0.00029405046,0.00007639073,0.0022270207],"genre_scores_gemma":[0.9957832,0.000012246727,0.0035393331,0.000014437219,0.00007394437,0.00021533004,0.000039457147,0.000012351361,0.0003096793],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.998739,0.000043257052,0.0006463736,0.00022942401,0.00019928465,0.00014263461],"domain_scores_gemma":[0.99843395,0.0002218738,0.00021106839,0.00019045176,0.0009186287,0.00002403536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025711485,0.00017419056,0.00028733883,0.000407981,0.00012244591,0.00004200837,0.00029281937,0.00010172747,0.00006810886],"category_scores_gemma":[0.00017996223,0.00016064034,0.00017565556,0.00037497267,0.000435409,0.00029882966,0.00003458792,0.00017345048,9.456339e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002595217,0.00021403524,0.013934833,0.00014888092,0.00046599138,1.3660512e-7,0.015162765,0.0046281405,0.007017601,0.93820494,0.0005016734,0.019461503],"study_design_scores_gemma":[0.00564306,0.0007061905,0.017376788,0.0006255854,0.00033395135,0.000054826258,0.761743,0.038344264,0.011480409,0.16099617,0.002074586,0.0006211537],"about_ca_topic_score_codex":0.0001579087,"about_ca_topic_score_gemma":0.0010675933,"teacher_disagreement_score":0.77720875,"about_ca_system_score_codex":0.0001405822,"about_ca_system_score_gemma":0.00010993072,"threshold_uncertainty_score":0.6550723},"labels":[],"label_agreement":null},{"id":"W4414544421","doi":"10.1680/jenes.24.00146","title":"Assessing the life cycle environmental impacts of modular construction: a US case study of a prototype housing unit","year":2025,"lang":"en","type":"article","venue":"Journal of Environmental Engineering and Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Scope (computer science); Life-cycle assessment; Resource efficiency; Modular design; Unit (ring theory); Sustainability; Resource (disambiguation); Environmental impact assessment","score_opus":0.006928575783308137,"score_gpt":0.22266038879232491,"score_spread":0.21573181300901678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414544421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9969979,0.00042388472,0.002162529,0.0000066638277,0.00022898303,0.00012885714,0.0000022130976,0.000007590342,0.000041391613],"genre_scores_gemma":[0.99908566,0.000046054978,0.0008352883,0.0000034548905,0.000020583138,0.0000021291105,8.1592475e-8,0.0000055337273,0.0000011914519],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992545,0.000013888508,0.00033087557,0.000076836346,0.00022206323,0.000101830046],"domain_scores_gemma":[0.99969333,0.000027470875,0.000110111454,0.00010213149,0.000008014224,0.000058930593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026546596,0.00009032981,0.00014532788,0.00017153572,0.00010299033,0.00004165575,0.00009747236,0.000027348618,0.000009309263],"category_scores_gemma":[0.000018926576,0.00006930582,0.000032467597,0.00019873328,0.0002560903,0.00038088285,0.000030448919,0.0001587299,1.1019745e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016743123,0.00015839821,0.05395648,0.0000745222,0.00011260708,0.000062365565,0.0014186976,0.4215505,0.50567764,0.00009227773,0.0000011898264,0.016878583],"study_design_scores_gemma":[0.0018448876,0.00075354264,0.43300346,0.00033981935,0.0002314725,0.0057135397,0.04329082,0.4700895,0.044226345,0.000055763954,0.00010792301,0.00034295119],"about_ca_topic_score_codex":0.000012515702,"about_ca_topic_score_gemma":0.0000010898833,"teacher_disagreement_score":0.4614513,"about_ca_system_score_codex":0.00005641592,"about_ca_system_score_gemma":0.00003042327,"threshold_uncertainty_score":0.28262094},"labels":[],"label_agreement":null},{"id":"W4414549080","doi":"10.24928/2025/0189","title":"A Lean Approach to Productivity Improvement in Roof Panel Manufacturing for Modular Off-site Construction Using DfMA and Emerging Technologies","year":2025,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Emerging technologies; Modular design; Design for manufacturability; Lean manufacturing","score_opus":0.018570895413963243,"score_gpt":0.230585939792821,"score_spread":0.21201504437885776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414549080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80904514,0.000040169954,0.18803456,0.00032371515,0.0013204662,0.0007675386,0.0000927574,0.00009789577,0.00027775677],"genre_scores_gemma":[0.9805241,0.000017406548,0.019162145,0.000015165113,0.000059254573,0.00013965355,0.000019997418,0.000012986154,0.00004924672],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989527,0.00000947787,0.00038468174,0.0003190153,0.00015497999,0.00017914211],"domain_scores_gemma":[0.99937046,0.000035557845,0.00012406251,0.00018175352,0.0002690242,0.000019159577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020126309,0.00017828855,0.00020370759,0.00036416625,0.00011792518,0.000060455277,0.00021674634,0.00011209542,0.0000020884156],"category_scores_gemma":[0.00009786776,0.00016492435,0.00008037036,0.00017648118,0.00017644188,0.00036168093,0.00008640688,0.00016015774,1.5701978e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018173132,0.000046395806,0.0045125335,0.00030790834,0.0001729218,1.0831508e-7,0.00065886363,0.017455671,0.08795952,0.12841822,0.000058151632,0.760228],"study_design_scores_gemma":[0.002134945,0.0001638054,0.005270862,0.00057728245,0.00012395432,0.00009522943,0.017971259,0.45235753,0.44087562,0.07624793,0.0035307629,0.00065082806],"about_ca_topic_score_codex":0.00006943409,"about_ca_topic_score_gemma":0.00008976374,"teacher_disagreement_score":0.75957716,"about_ca_system_score_codex":0.00017777641,"about_ca_system_score_gemma":0.000038610942,"threshold_uncertainty_score":0.672542},"labels":[],"label_agreement":null},{"id":"W4414680902","doi":"10.1007/978-3-031-99025-0_19","title":"Innovative Engineering Anchor Systems for Retrofits","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; University of Ottawa","funders":"","keywords":"Retrofitting; Failure mode and effects analysis; Fibre-reinforced plastic; Anchoring; Composite number; Adhesive; Lag; Matrix (chemical analysis)","score_opus":0.008619377521788015,"score_gpt":0.1973230651028846,"score_spread":0.1887036875810966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414680902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000042735217,0.058506794,0.9111051,0.0000180786,0.007662175,0.0010367164,0.000069943206,0.00022927615,0.021329178],"genre_scores_gemma":[0.97392064,0.0026892314,0.00039571783,0.00006259076,0.00429164,0.00050500646,0.0002826517,0.0002002325,0.017652282],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988453,0.000009733568,0.0005085614,0.00028533637,0.00010631234,0.00024477724],"domain_scores_gemma":[0.99927646,0.0002494836,0.00009194979,0.00019106033,0.00015186258,0.000039190432],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001552973,0.00037552448,0.00056371134,0.0002656764,0.00004611929,0.00012362856,0.00008645658,0.0008005928,0.0000039499037],"category_scores_gemma":[0.000034007273,0.00035066914,0.000060715716,0.00014380542,0.000021910346,0.000050368508,0.000014991395,0.0005001063,5.570045e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010754519,0.0000010552902,0.000055916877,0.0009742896,0.00013372423,0.0000027779356,0.000050636663,0.89152694,0.000011154339,0.09017052,0.0023874673,0.014674785],"study_design_scores_gemma":[0.00022098512,0.00002792738,0.000008837495,0.002136896,0.000027267575,0.000018525645,0.000006375337,0.887958,0.0000062042386,0.000392953,0.10883841,0.00035763968],"about_ca_topic_score_codex":0.000020826245,"about_ca_topic_score_gemma":0.00002603122,"teacher_disagreement_score":0.9738779,"about_ca_system_score_codex":0.00013915003,"about_ca_system_score_gemma":0.000022387758,"threshold_uncertainty_score":0.99989456},"labels":[],"label_agreement":null},{"id":"W4414692457","doi":"","title":"Guide pour la mise en place d’une charte pour l’usage des techniques d’intelligence artificielle en école d’architecture","year":2025,"lang":"fr","type":"report","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Scarring alopecia; Constitution","score_opus":0.011870201072775081,"score_gpt":0.23486287534427364,"score_spread":0.22299267427149855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414692457","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003969869,0.0025919906,0.32394195,0.012491933,0.0005358267,0.00071908184,0.00016972964,0.0006851642,0.6548945],"genre_scores_gemma":[0.028947867,0.0071584145,0.09459519,0.00008416371,0.00021552361,0.00028413648,0.0005031039,0.00014962917,0.86806196],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99092406,0.005172593,0.0013784907,0.0010859597,0.0006958222,0.0007430652],"domain_scores_gemma":[0.98995024,0.0044092527,0.0005704882,0.0020497537,0.0027159003,0.0003043377],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0060665966,0.00085549353,0.0007785977,0.00057834934,0.0006702598,0.000557024,0.0014337224,0.0010926888,0.0014528533],"category_scores_gemma":[0.0019207085,0.0009401917,0.00050318096,0.0010668149,0.0005261623,0.00026543398,0.0004707202,0.0016860568,0.00022910333],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016083135,0.0003231434,0.00045361838,0.00078119885,0.00020698858,0.000024368586,0.006513228,0.0008755828,0.02206032,0.046429757,0.007483004,0.9148327],"study_design_scores_gemma":[0.00022343923,0.0000013788259,0.00044545208,0.0059841704,0.00018078162,0.00028586798,0.00068920717,0.023015747,0.14532562,0.0067803795,0.8162055,0.0008624521],"about_ca_topic_score_codex":0.0053518955,"about_ca_topic_score_gemma":0.0062780827,"teacher_disagreement_score":0.91397023,"about_ca_system_score_codex":0.0008102674,"about_ca_system_score_gemma":0.0012276351,"threshold_uncertainty_score":0.99946},"labels":[{"model":"gemma","categories":[],"domain":null,"study_design":"not_applicable","genre":"other","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":[],"domain":null,"study_design":"design_other","genre":"other","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"split"},{"id":"W4414692685","doi":"10.64889/k559ke75","title":"Analogs as a research platform: Systems-based optimization approach to facility selection","year":2025,"lang":"en","type":"article","venue":"Analog Astronaut™ Research Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Selection (genetic algorithm); Mars Exploration Program; Feature selection; Martian surface; Analog computer; Analytic hierarchy process","score_opus":0.05817749041672972,"score_gpt":0.3509981701202323,"score_spread":0.2928206797035026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414692685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046811566,0.00036427152,0.916857,0.00033662116,0.00047363588,0.00058712537,0.00002124388,0.00015986085,0.034388676],"genre_scores_gemma":[0.9918097,0.00005341059,0.006525103,0.000021684325,0.00023150684,0.00014577634,0.000052380125,0.000018652056,0.001141736],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963649,0.000607043,0.0004976636,0.0003344068,0.0013336325,0.0008623746],"domain_scores_gemma":[0.9974668,0.00018673914,0.000036178004,0.00025933745,0.0017204217,0.00033052967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046691443,0.0001810307,0.00023263764,0.002218195,0.0009769528,0.0006400228,0.00037864412,0.00020723016,0.00015109088],"category_scores_gemma":[0.00039115635,0.00017037224,0.00009506569,0.0029557128,0.00016180346,0.00039341042,0.00005195085,0.0021729795,0.00009011555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097725526,0.0000668669,0.0016130322,0.00007366915,0.00008713862,0.0000033360054,0.00008914919,0.9588156,0.0007209617,0.0068648504,0.014840869,0.016726846],"study_design_scores_gemma":[0.00060951535,0.00029059686,0.001871004,0.00014232795,0.000012812622,0.000094898576,0.0020228957,0.9838229,0.0008580254,0.0006927468,0.00938967,0.00019261874],"about_ca_topic_score_codex":0.00026424375,"about_ca_topic_score_gemma":0.00004888418,"teacher_disagreement_score":0.9449982,"about_ca_system_score_codex":0.0010262517,"about_ca_system_score_gemma":0.000710859,"threshold_uncertainty_score":0.94406354},"labels":[],"label_agreement":null},{"id":"W4414948238","doi":"10.3390/infrastructures10100266","title":"Digital Integration in Construction: A Case Study on Common Data Environment Implementation for a Metro Line Project","year":2025,"lang":"en","type":"article","venue":"Infrastructures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Workflow; Software deployment; Automation; Consistency (knowledge bases); Stakeholder; Cloud computing; Field (mathematics); Data integration; System integration","score_opus":0.02646416595865115,"score_gpt":0.32432318965952966,"score_spread":0.2978590237008785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414948238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94982094,0.000051607738,0.04648484,0.000051641306,0.0006599454,0.0013875721,0.00042354158,0.00012952664,0.0009903753],"genre_scores_gemma":[0.997123,0.0000042775832,0.0021538625,0.000028804465,0.00007509539,0.00018899103,0.00039783647,0.00001290081,0.000015223134],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9990971,0.000026506117,0.00037091918,0.00025707824,0.00011280098,0.0001355574],"domain_scores_gemma":[0.9994965,0.00006258265,0.000048368962,0.0003521137,0.00002168452,0.00001874488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093737646,0.00016885216,0.00016304603,0.00032579672,0.000076503326,0.00012303138,0.00013345905,0.00006597877,0.00003549743],"category_scores_gemma":[0.000020313093,0.00015320166,0.000029169743,0.0002194137,0.000037270114,0.00032919613,0.000039228697,0.00015850407,0.0000015618501],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074376425,0.00006215618,0.031233568,0.000030719304,0.00009334479,0.000027302376,0.0006900696,0.0036334551,0.00039916625,0.002084263,0.0017717462,0.95989984],"study_design_scores_gemma":[0.024337651,0.0038490987,0.15025495,0.00046518695,0.00073518115,0.002117262,0.3963608,0.3098827,0.032371584,0.040551014,0.03604498,0.003029577],"about_ca_topic_score_codex":0.00012883752,"about_ca_topic_score_gemma":0.0011509347,"teacher_disagreement_score":0.95687026,"about_ca_system_score_codex":0.00014427747,"about_ca_system_score_gemma":0.000030313762,"threshold_uncertainty_score":0.6247382},"labels":[],"label_agreement":null},{"id":"W4414979419","doi":"10.1007/s44150-025-00177-9","title":"Integrating life cycle assessment in space layout planning for minimizing the embodied carbon emission of modular buildings – identification of influencing factors","year":2025,"lang":"en","type":"article","venue":"Architecture Structures and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Concordia University","funders":"National Research Council Canada","keywords":"Modular design; Identification (biology); Life-cycle assessment; Process (computing); Relevance (law); Embodied energy; Engineering design process","score_opus":0.005460698791348866,"score_gpt":0.24338746637308484,"score_spread":0.23792676758173598,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414979419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95304024,0.00036860365,0.045249455,0.00007715648,0.00042713317,0.00029360235,0.000011348289,0.000042850523,0.00048958947],"genre_scores_gemma":[0.9937618,0.000013458379,0.0061379364,0.000008936267,0.000033690554,0.000019609903,0.0000098342725,0.000011603427,0.0000031472293],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989874,0.00004072398,0.00051394483,0.00019101072,0.0001248858,0.00014207479],"domain_scores_gemma":[0.9994183,0.00012508314,0.00019713392,0.00015381532,0.000076822085,0.000028810018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015758691,0.00016895255,0.00024424333,0.00027747062,0.0001102064,0.000033336757,0.0000944565,0.00012114053,0.0000018674543],"category_scores_gemma":[0.0001042513,0.00012602808,0.0000630755,0.00027236962,0.00012590685,0.00007256129,0.00002296351,0.00027141464,4.698216e-9],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009038219,0.0000084059375,0.080365755,0.0007288658,0.00016086905,2.4499138e-7,0.006884232,0.2337719,0.45424762,0.10351257,0.000007637345,0.12022151],"study_design_scores_gemma":[0.0015522984,0.00009396032,0.16813497,0.0010389888,0.00020317931,0.000028250104,0.031028038,0.42156857,0.24179202,0.13384734,0.00018509029,0.00052730733],"about_ca_topic_score_codex":0.00013667849,"about_ca_topic_score_gemma":0.000029116916,"teacher_disagreement_score":0.21245559,"about_ca_system_score_codex":0.000046007513,"about_ca_system_score_gemma":0.000051660583,"threshold_uncertainty_score":0.51392764},"labels":[],"label_agreement":null},{"id":"W4414981456","doi":"10.3390/su17198945","title":"A Conceptual Framework for Enabling Structural Steel Reuse Utilizing Circular Economy in Modular Construction","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Canada First Research Excellence Fund; Concordia University","keywords":"Circular economy; Reuse; Modular design; Certification; Modularity (biology); Sustainability; Resource (disambiguation); Material efficiency","score_opus":0.00939170013188222,"score_gpt":0.2542634550556289,"score_spread":0.2448717549237467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414981456","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84902656,0.00046898553,0.14770712,0.0003109331,0.0007527361,0.0007684399,0.000009125445,0.00022915719,0.00072697335],"genre_scores_gemma":[0.99225265,0.000006483896,0.00740694,0.000040928415,0.00007270164,0.00017051792,0.000011593178,0.000014216087,0.000023971175],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99886787,0.000049953178,0.0003944736,0.00031015003,0.00006171376,0.00031581742],"domain_scores_gemma":[0.9989878,0.00014490215,0.000040265113,0.00044413612,0.0003392659,0.000043646534],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024294153,0.00017324397,0.00023262575,0.00019789633,0.000119487726,0.000065538894,0.00016657716,0.0002211201,0.000032113778],"category_scores_gemma":[0.0008791949,0.000193686,0.00009972638,0.0003472436,0.00021130373,0.00029492928,0.000036752903,0.00030748968,6.896104e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040867555,0.000009019174,0.022765167,0.0005008251,0.00004049324,0.0000015640611,0.00084906036,0.014355581,0.00020481332,0.94009537,0.00003508766,0.021102143],"study_design_scores_gemma":[0.0006623902,0.00002131242,0.0072184233,0.000056919092,0.000022412456,0.000005258756,0.015546851,0.049134567,0.001947225,0.91740537,0.007720026,0.00025922756],"about_ca_topic_score_codex":0.00003820201,"about_ca_topic_score_gemma":0.000014972865,"teacher_disagreement_score":0.14322612,"about_ca_system_score_codex":0.0011043857,"about_ca_system_score_gemma":0.0002268789,"threshold_uncertainty_score":0.7898286},"labels":[],"label_agreement":null},{"id":"W4415048789","doi":"10.1109/toh.2025.3620038","title":"Haptic-Assisted Soldering Training Protocol in Virtual Reality: The Impact of Scaffolded Guidance","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Haptics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Haptic technology; Virtual reality; Task (project management); SAFER; Protocol (science); Virtual machine; Virtual training; Transfer of training","score_opus":0.03293334836998599,"score_gpt":0.2983370314729121,"score_spread":0.26540368310292606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415048789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028441286,0.000007638791,0.96006095,0.00010597526,0.00040468626,0.0062142513,0.000023017139,0.00018986834,0.0045523313],"genre_scores_gemma":[0.9939928,0.000004954073,0.000371653,0.000015323418,0.000017474262,0.0053915307,6.677701e-7,0.000016886383,0.000188701],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99911207,0.00004012244,0.00040811437,0.0001324034,0.00012364422,0.00018364606],"domain_scores_gemma":[0.99952143,0.00009138587,0.00004407616,0.00025370516,0.00005890296,0.000030471741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015611615,0.00015748867,0.00018885013,0.00020666234,0.00008873517,0.00003302555,0.00013050248,0.000107330234,0.000034983248],"category_scores_gemma":[0.0000070418328,0.00012503832,0.00013720237,0.00048907293,0.00008104552,0.0001095305,7.07284e-7,0.0002693123,0.0000034730176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084003106,0.00008997825,0.00003671633,0.00007473407,0.00015189408,0.0000014663353,0.0008688191,0.7898817,0.035167098,0.001654324,0.00019059765,0.17179866],"study_design_scores_gemma":[0.0015860638,0.00020546433,0.0027404998,0.00046397623,0.000060095845,0.000016606919,0.00096379704,0.95225465,0.040259916,0.0005973978,0.0005486593,0.00030284675],"about_ca_topic_score_codex":0.00009909539,"about_ca_topic_score_gemma":0.00025825252,"teacher_disagreement_score":0.9655515,"about_ca_system_score_codex":0.00016756645,"about_ca_system_score_gemma":0.00009265439,"threshold_uncertainty_score":0.50989145},"labels":[],"label_agreement":null},{"id":"W4415167283","doi":"10.3390/buildings15203696","title":"Correction: Ahmadianroohbakhsh et al. Approximating Helical Pile Pullout Resistance Using Metaheuristic-Enabled Fuzzy Hybrids. Buildings 2023, 13, 347","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Pile; Fuzzy logic; Finite element method","score_opus":0.009285314522379734,"score_gpt":0.23808288279278916,"score_spread":0.22879756827040942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415167283","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2717216,0.004500019,0.5333348,0.0029700398,0.012720149,0.0010593928,0.00006833797,0.0023763145,0.17124937],"genre_scores_gemma":[0.9022406,0.0003247046,0.07793751,0.0034720695,0.00048264145,0.00018847207,0.000061309656,0.00016818587,0.015124534],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99798167,0.000063883344,0.0006587285,0.00051332655,0.00029826007,0.00048415465],"domain_scores_gemma":[0.99900985,0.00014640437,0.00013024287,0.00035610655,0.00023195313,0.00012546232],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004985168,0.00035359914,0.00041659578,0.00032078035,0.0003406248,0.00030338235,0.00026453793,0.00016080454,0.00013199892],"category_scores_gemma":[0.00037247318,0.0003862922,0.0001471539,0.0010705752,0.000094319694,0.00042395398,0.00006700921,0.0006017765,0.000046428708],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010789022,0.000083753424,0.001201837,0.00040165597,0.00033763482,0.000026078247,0.00039413213,0.0136970095,0.083791874,0.06471072,0.8033823,0.031865157],"study_design_scores_gemma":[0.000922139,0.000027418964,0.00045232588,0.00082591636,0.00016692314,0.00010875878,0.00039551864,0.11791625,0.027265335,0.003353033,0.84772605,0.00084033626],"about_ca_topic_score_codex":0.00020248615,"about_ca_topic_score_gemma":0.00011018257,"teacher_disagreement_score":0.630519,"about_ca_system_score_codex":0.00032326014,"about_ca_system_score_gemma":0.00011698418,"threshold_uncertainty_score":0.9998589},"labels":[],"label_agreement":null},{"id":"W4415259607","doi":"10.1007/978-3-031-97693-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 6","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004613379399863161,"score_gpt":0.1756732777603878,"score_spread":0.17105989836052463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415259607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017273647,0.010582592,0.7015963,0.0012650469,0.024249606,0.006023337,0.002932198,0.00219547,0.24942808],"genre_scores_gemma":[0.94448924,0.0001957423,0.0074885148,0.00015987475,0.0014782198,0.0005236122,0.00014066555,0.00037360776,0.04515054],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984607,0.0000019651366,0.00046718557,0.0003342729,0.00023435657,0.0005014904],"domain_scores_gemma":[0.9992161,0.00012754968,0.000076879754,0.00021729324,0.00026209815,0.000100108635],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000145217,0.00050551683,0.00049466995,0.0003559708,0.00007357504,0.00008363727,0.0004186701,0.0008504146,0.00009396898],"category_scores_gemma":[0.00018384005,0.0004900459,0.00038065418,0.00040943275,0.00004584591,0.00012904959,0.000046106543,0.0011678111,0.0000015812278],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005830096,0.000007638168,0.00021791225,0.0042690504,0.0003943736,0.0000013184307,0.001857416,0.93179995,0.0013252259,0.009132686,0.045314327,0.0056742616],"study_design_scores_gemma":[0.00042499817,0.000030863448,0.0002590314,0.0027826808,0.00015522694,0.000017693419,0.000027938286,0.6960051,0.0024361112,0.0019217434,0.2949286,0.0010100196],"about_ca_topic_score_codex":0.00063528254,"about_ca_topic_score_gemma":0.08821811,"teacher_disagreement_score":0.94276184,"about_ca_system_score_codex":0.0009755308,"about_ca_system_score_gemma":0.0005743076,"threshold_uncertainty_score":0.99975514},"labels":[],"label_agreement":null},{"id":"W4415354881","doi":"10.1016/j.eswa.2025.130050","title":"A multi-user game-based system for planning modular construction activities","year":2025,"lang":"en","type":"article","venue":"Expert Systems with Applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Modular design; Key (lock); Usability; Limiting; Protocol (science); Mode (computer interface); Modular construction","score_opus":0.009885647539409665,"score_gpt":0.23777627739242801,"score_spread":0.22789062985301836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415354881","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034765564,0.0011040181,0.9911353,0.000036933532,0.00056093256,0.0013302657,0.000036215402,0.0008177237,0.0015020383],"genre_scores_gemma":[0.9659048,0.0000037304587,0.022543333,0.000019996807,0.00015116476,0.010820838,0.00004397434,0.000029901072,0.0004823166],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926543,0.000017516944,0.00025025263,0.00021115554,0.00009376666,0.0001619015],"domain_scores_gemma":[0.9994615,0.00005702954,0.000057777,0.00028209924,0.00009932582,0.000042305244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000056722336,0.00016186367,0.00018791313,0.00017286644,0.00018479198,0.00008644829,0.000093292714,0.00010716719,0.0000024664423],"category_scores_gemma":[0.000002887664,0.00014619094,0.00004746741,0.00024765282,0.000056561392,0.00011701439,0.0000043322343,0.000083090716,0.0000058023697],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013413499,0.00010440861,0.0021398438,0.002604652,0.000549298,0.0000014697761,0.0013613583,0.5627902,0.063657604,0.3467102,0.0046510245,0.015295768],"study_design_scores_gemma":[0.0016226459,0.000031740343,0.00014178042,0.0007495658,0.00005519593,0.000042457195,0.012874159,0.6682422,0.021231579,0.000031956744,0.29454514,0.00043157802],"about_ca_topic_score_codex":0.00003400551,"about_ca_topic_score_gemma":0.000006597667,"teacher_disagreement_score":0.968592,"about_ca_system_score_codex":0.00018219436,"about_ca_system_score_gemma":0.000056915007,"threshold_uncertainty_score":0.5961493},"labels":[],"label_agreement":null},{"id":"W4415438371","doi":"10.1007/978-3-031-97435-9_12","title":"Influence of Loading Angle on the Performance of Registration Pin Connection in VectorBloc Modular Construction System","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Cable gland; Thread (computing); Modular design; Welding; Troubleshooting; Failure mode and effects analysis","score_opus":0.004972810775130084,"score_gpt":0.17106911654574677,"score_spread":0.16609630577061668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415438371","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9017483,0.001214473,0.07002567,0.000044343997,0.0014978651,0.00077849015,0.000032550743,0.00031219146,0.024346111],"genre_scores_gemma":[0.99947214,0.000105216866,0.00022882587,0.000004535784,0.000065747474,0.000023334136,0.000011547333,0.000029175017,0.000059464543],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989413,0.00001181873,0.0005362485,0.00019022632,0.00018329638,0.0001371291],"domain_scores_gemma":[0.99932486,0.00018662962,0.00014379449,0.00025373494,0.000075764285,0.000015191581],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001607008,0.0002569518,0.00033504772,0.0004904285,0.000022246943,0.000011738364,0.00011250986,0.00034892862,0.0000114679],"category_scores_gemma":[0.000089093504,0.00024186724,0.00006559477,0.00021749202,0.000045321274,0.00009168153,0.000010812313,0.00056550006,0.0000010800151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011473458,0.0000023466573,0.0001923289,0.0009074112,0.000026020216,0.0000010000128,0.00007938276,0.9504898,0.010298811,0.035744954,0.000002908897,0.0022435375],"study_design_scores_gemma":[0.0003256541,0.000090757334,0.00096436165,0.0088239685,0.000040137893,0.000032158532,0.000022075235,0.8903544,0.097937025,0.0006413486,0.0003495993,0.00041851183],"about_ca_topic_score_codex":0.00003416019,"about_ca_topic_score_gemma":0.00021641955,"teacher_disagreement_score":0.09772385,"about_ca_system_score_codex":0.00032090233,"about_ca_system_score_gemma":0.000035106772,"threshold_uncertainty_score":0.98630595},"labels":[],"label_agreement":null},{"id":"W4415467310","doi":"10.18502/jewes.v1i1.18838","title":"Decarbonizing the Cement Industry: A Comprehensive Analysis of Renewable Energy Pathways and GHG Emissions in the UAE","year":2025,"lang":"","type":"article","venue":"Journal of Excellence in Wellness and Environmental Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Greenhouse gas; Fossil fuel; Electricity; Sustainability; Natural gas; Climate change; Climate change mitigation; Electricity generation","score_opus":0.021384445990101843,"score_gpt":0.23851954840592995,"score_spread":0.21713510241582812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415467310","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92728275,0.07104248,0.00031533893,0.0006956295,0.00025041672,0.000080719255,0.00000791119,0.0000011624179,0.00032357094],"genre_scores_gemma":[0.92241025,0.07742608,0.000022120592,0.00006079925,0.000024795077,0.00000968268,6.968532e-7,0.0000041055055,0.00004144939],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9986002,0.00014383857,0.000717631,0.00014742557,0.00022604522,0.00016486096],"domain_scores_gemma":[0.9991942,0.0003748976,0.00025457394,0.0001292099,0.000015047008,0.00003206349],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034947004,0.00018654081,0.000481892,0.00030733104,0.00021201269,0.000033837434,0.00015022662,0.00011881531,0.00002375582],"category_scores_gemma":[0.000020132517,0.00011290931,0.00009509352,0.00057503715,0.00037442707,0.0001055539,0.00012259527,0.0004120316,4.7371078e-8],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028836695,0.0006028772,0.4019017,0.00039631967,0.0057609724,0.00008561512,0.046870325,0.34712672,0.015242759,0.0027840275,0.0006648061,0.17827551],"study_design_scores_gemma":[0.0016855864,0.0002674801,0.22462009,0.0020919496,0.002291021,0.00005425886,0.70817924,0.044714075,0.005465724,0.0044599194,0.005731993,0.00043864237],"about_ca_topic_score_codex":0.0005403883,"about_ca_topic_score_gemma":0.00041490194,"teacher_disagreement_score":0.66130894,"about_ca_system_score_codex":0.00011850419,"about_ca_system_score_gemma":0.00001855757,"threshold_uncertainty_score":0.4604308},"labels":[],"label_agreement":null},{"id":"W4415555245","doi":"10.1007/978-3-031-95115-2","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 16","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004601092835838849,"score_gpt":0.17568753404030255,"score_spread":0.1710864412044637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415555245","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012638789,0.008943324,0.73248476,0.0010124088,0.019437129,0.0048487377,0.0023726465,0.001792534,0.22784461],"genre_scores_gemma":[0.9536439,0.00016301006,0.0046682176,0.00013620706,0.0012078049,0.0004260394,0.00012861147,0.00030273045,0.039323464],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984128,0.0000021219205,0.00047985162,0.00034605412,0.00024127692,0.00051790854],"domain_scores_gemma":[0.99919003,0.0001324612,0.00008053826,0.00022444174,0.00026816895,0.00010437583],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014975073,0.0005228491,0.00050884084,0.00036404197,0.000076477,0.00008676768,0.00042666262,0.00087051705,0.00011630892],"category_scores_gemma":[0.0001900444,0.0005053735,0.00039184702,0.0004160438,0.000047513804,0.00013371433,0.000047917616,0.001188908,0.0000016544095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008591575,0.0000108240865,0.00027204683,0.0059002666,0.0005564151,0.0000015810967,0.0024386484,0.8987479,0.0014812474,0.011822999,0.07051961,0.008239874],"study_design_scores_gemma":[0.0005351534,0.000038777605,0.00021271166,0.0034898932,0.00019225178,0.000022356064,0.000043725904,0.61091447,0.003520976,0.0024494254,0.37732798,0.0012522422],"about_ca_topic_score_codex":0.0008907831,"about_ca_topic_score_gemma":0.11488006,"teacher_disagreement_score":0.95238006,"about_ca_system_score_codex":0.0013520241,"about_ca_system_score_gemma":0.00058509427,"threshold_uncertainty_score":0.99973977},"labels":[],"label_agreement":null},{"id":"W4415598957","doi":"10.1115/detc2025-169608","title":"A Lightweight Multi-Expert Generative Language Model System for Engineering Information and Knowledge Extraction","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Inference; Adaptation (eye); Generative grammar; Graph; Process (computing); Key (lock); Domain (mathematical analysis); Toolbox; Metric (unit)","score_opus":0.00858699833317431,"score_gpt":0.24557342709132196,"score_spread":0.23698642875814765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415598957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00509229,0.0040645455,0.98142934,0.00008727572,0.0019660087,0.00068077276,0.000036725647,0.0003769042,0.006266161],"genre_scores_gemma":[0.92317337,0.0002644805,0.073583014,0.00004095133,0.00020376881,0.00038694585,0.000049171987,0.000024095147,0.0022742238],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896187,0.000015449205,0.0005274185,0.00019484399,0.00007384115,0.00022655164],"domain_scores_gemma":[0.9994407,0.00005990859,0.00006618029,0.00015695488,0.00020577379,0.000070474205],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00013352073,0.00028222977,0.00024265933,0.00038375115,0.00017621063,0.000216246,0.00006573642,0.00027814758,0.000014366081],"category_scores_gemma":[0.00003182612,0.00027729242,0.000086761676,0.00023562463,0.000018448665,0.0011456254,0.000024417877,0.00017981572,0.000015396352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095275274,0.00008662958,0.00002408046,0.0036230262,0.00047645808,7.1051414e-7,0.019709764,0.14629696,0.08645303,0.4143461,0.0031402146,0.32574773],"study_design_scores_gemma":[0.0008658262,0.0000190437,0.0000203657,0.00026860135,0.000051553092,0.000009014697,0.00321667,0.92711675,0.059452303,0.000016012811,0.008719675,0.00024418472],"about_ca_topic_score_codex":0.000039442206,"about_ca_topic_score_gemma":0.000047971014,"teacher_disagreement_score":0.91808105,"about_ca_system_score_codex":0.00033350295,"about_ca_system_score_gemma":0.00009711549,"threshold_uncertainty_score":0.99996793},"labels":[],"label_agreement":null},{"id":"W4415749548","doi":"10.2316/j.2025.203-0601","title":"BUILDING ENERGY MANAGEMENT SYSTEM OPTIMISATION–BASED ON BIM TECHNOLOGY, 89-100","year":2025,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy management; Management system; Energy (signal processing); Operation planning; Maintenance engineering","score_opus":0.0035154510730651353,"score_gpt":0.20905701670397234,"score_spread":0.2055415656309072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415749548","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007002402,0.0017068246,0.93658006,0.00050213654,0.011082425,0.000032796004,0.0000076258125,0.00015452373,0.042931203],"genre_scores_gemma":[0.99808496,0.000089178226,0.0011442917,0.00007012159,0.00015620443,0.000012065445,0.0000022832216,0.00001042805,0.00043047103],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999107,0.000021586571,0.00041547415,0.00009830528,0.0002624558,0.0000951752],"domain_scores_gemma":[0.99950016,0.000027785205,0.00011377186,0.00009346212,0.0002275022,0.00003733241],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012040698,0.00011878,0.00015462497,0.00092194753,0.000042105847,0.000100572004,0.00020079856,0.00009452596,0.000008556669],"category_scores_gemma":[0.000005522651,0.00010434134,0.00006356747,0.00018339179,0.000028377128,0.00010727267,0.000017176288,0.00008194223,8.5710525e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031374246,0.000017822884,0.00016780109,0.000038988088,0.00033835054,0.000032801643,0.000012832432,0.15190972,0.00037479095,0.815473,0.0015255155,0.03007699],"study_design_scores_gemma":[0.0019716206,0.00014746153,0.00035910885,0.0027442854,0.00009838323,0.00053244334,0.0013536264,0.45950687,0.005006515,0.0021503896,0.52573776,0.00039155924],"about_ca_topic_score_codex":0.00002811763,"about_ca_topic_score_gemma":0.0000028214258,"teacher_disagreement_score":0.99108255,"about_ca_system_score_codex":0.00021363422,"about_ca_system_score_gemma":0.000020786876,"threshold_uncertainty_score":0.42549166},"labels":[],"label_agreement":null},{"id":"W4415764122","doi":"10.29173/mocs312","title":"Interdependence between Factors Influencing the Selection of Project Delivery Systems and Modular Construction","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Context (archaeology); Ambiguity; Selection (genetic algorithm); Modular design; Pre-construction services; Project management; Construction management; Project management triangle","score_opus":0.01006478965792922,"score_gpt":0.21383549293992637,"score_spread":0.20377070328199715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9775619,0.0035130968,0.013851544,0.000083320156,0.0022408317,0.0011785148,0.000066424174,0.00023594307,0.0012684088],"genre_scores_gemma":[0.996361,0.0018190525,0.0011857183,0.000013784206,0.00029121654,0.000062483414,0.000018590174,0.000049034716,0.00019908902],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9965554,0.00009149423,0.0013665573,0.00092388084,0.0005165918,0.00054606627],"domain_scores_gemma":[0.99786067,0.00011756495,0.0006140071,0.00024300144,0.0010204602,0.00014430976],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000529932,0.0007294062,0.00087420375,0.0010308502,0.0008592543,0.0006485863,0.0002638047,0.0006898869,0.0000384123],"category_scores_gemma":[0.00010211995,0.000655658,0.00019903273,0.0014283666,0.0011248067,0.0014877963,0.00016851777,0.0009582367,0.0000020704185],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015389768,0.000031629508,0.72161824,0.002828394,0.0011394747,9.418096e-7,0.0024709508,0.00071775715,0.025859933,0.033436015,0.00021432918,0.21152844],"study_design_scores_gemma":[0.006198763,0.0012984173,0.3334802,0.007518173,0.0051020226,0.0010200839,0.15573946,0.29956362,0.15984797,0.0054507945,0.020393603,0.0043868553],"about_ca_topic_score_codex":0.00075736956,"about_ca_topic_score_gemma":0.00004629687,"teacher_disagreement_score":0.38813803,"about_ca_system_score_codex":0.00031796916,"about_ca_system_score_gemma":0.00019573687,"threshold_uncertainty_score":0.99958944},"labels":[],"label_agreement":null},{"id":"W4415764123","doi":"10.29173/mocs317","title":"Barriers and Potential Solutions to the Adoption of Modular and Offsite Construction: A Review","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Modular design; Foundation (evidence); Key (lock); Sustainability; Field (mathematics)","score_opus":0.00585997719051752,"score_gpt":0.20008737709929617,"score_spread":0.19422739990877866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764123","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7396025,0.11259698,0.12630865,0.008298719,0.005687146,0.0037274791,0.00033047708,0.00040638086,0.0030416586],"genre_scores_gemma":[0.94913495,0.040534217,0.00894562,0.00042303297,0.0003547083,0.00013980306,0.000030734,0.000054859553,0.00038207107],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9965465,0.000080964586,0.0012660046,0.0010043264,0.00048796376,0.0006142383],"domain_scores_gemma":[0.9978664,0.000040910305,0.00039109864,0.00035365467,0.0009205497,0.0004273874],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007160637,0.00069751457,0.00090904103,0.00067786913,0.0012174781,0.00041090188,0.00022618793,0.00048653455,0.00014929958],"category_scores_gemma":[0.00016417418,0.00066834915,0.0002312983,0.0013872257,0.0013947706,0.00094552594,0.00024854654,0.0007000636,0.000008182311],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003555412,0.000056701607,0.024950214,0.009848236,0.0013160781,0.000008069504,0.0011735716,0.0011466588,0.01633726,0.20351867,0.0050321273,0.73625684],"study_design_scores_gemma":[0.01337994,0.0016747708,0.060136225,0.037599634,0.0135343755,0.010194068,0.04789049,0.28875726,0.015150958,0.020398516,0.48358086,0.0077028796],"about_ca_topic_score_codex":0.000071648756,"about_ca_topic_score_gemma":0.000024327881,"teacher_disagreement_score":0.728554,"about_ca_system_score_codex":0.00015039484,"about_ca_system_score_gemma":0.00015351232,"threshold_uncertainty_score":0.99957675},"labels":[],"label_agreement":null},{"id":"W4415764125","doi":"10.29173/mocs310","title":"Decarbonization of Modular Construction and LEED v5 Certification","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"California State University, Sacramento","keywords":"Demolition; Certification; Embodied energy; Greenhouse gas; Modular design; Resource efficiency; Sustainability; Life-cycle assessment; Carbon footprint","score_opus":0.006101554106341071,"score_gpt":0.19626254823648398,"score_spread":0.1901609941301429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87524736,0.00537664,0.11022576,0.00055633293,0.0027812775,0.0009895504,0.00005659116,0.00032843812,0.0044380324],"genre_scores_gemma":[0.983032,0.0033813387,0.012770695,0.00004713763,0.00022776012,0.000060267976,0.00006365392,0.0000626231,0.00035452787],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965217,0.000052324613,0.0014358043,0.0010395793,0.0004521339,0.00049846363],"domain_scores_gemma":[0.99764603,0.00005023024,0.0005729568,0.0003153371,0.0011958503,0.00021958041],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00039225598,0.00068977533,0.0008085574,0.0011668879,0.0005626739,0.0004282928,0.00018774922,0.0008024612,0.00007604256],"category_scores_gemma":[0.00012994625,0.0008082989,0.0001781293,0.0015045789,0.0011801177,0.0013272798,0.00010726828,0.00057109655,0.0000058303763],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021403801,0.00006942139,0.07238624,0.0017632251,0.00050295383,0.0000012114947,0.0007210551,0.0004750704,0.1287739,0.28888744,0.00020780269,0.50599766],"study_design_scores_gemma":[0.008196672,0.00053853047,0.09812327,0.0034926338,0.0030548004,0.0007053842,0.015211506,0.49004096,0.29854763,0.0488037,0.029825235,0.0034597053],"about_ca_topic_score_codex":0.000103914885,"about_ca_topic_score_gemma":0.000022699001,"teacher_disagreement_score":0.50253797,"about_ca_system_score_codex":0.0002294669,"about_ca_system_score_gemma":0.00012831134,"threshold_uncertainty_score":0.9994368},"labels":[],"label_agreement":null},{"id":"W4415764132","doi":"10.29173/mocs309","title":"A Data-Driven Framework for Automated Generation of PC Component Trailer Arrival Times: Integrating Work Interruptions Simulation and Duration Prediction","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Component (thermodynamics); Duration (music); Arrival time; Work (physics); Precast concrete; Intuition","score_opus":0.035211647481511385,"score_gpt":0.2800561496355948,"score_spread":0.24484450215408338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4360093,0.00077547005,0.5584661,0.00027051163,0.0020444565,0.0012712813,0.00048541196,0.00047212173,0.00020539376],"genre_scores_gemma":[0.9283543,0.00032865556,0.06960918,0.0000367729,0.00044876582,0.00013093656,0.0009541154,0.000053444754,0.00008377906],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99656385,0.000058723854,0.0016294473,0.0010070445,0.00034864494,0.00039228794],"domain_scores_gemma":[0.99777615,0.00017281162,0.00062627386,0.0003504574,0.0009230144,0.00015127684],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00048094618,0.00058832124,0.0006755637,0.0007785803,0.0006969835,0.0005432843,0.00022261098,0.0007269739,0.00006024698],"category_scores_gemma":[0.00034682054,0.0006486903,0.00014946598,0.00093093584,0.00043374888,0.0017672457,0.00013233261,0.0005717764,0.0000023384862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010891118,0.0003330576,0.042609446,0.003731921,0.0021589575,0.0000013985701,0.005395846,0.122962356,0.08463465,0.26369977,0.0033356957,0.4700478],"study_design_scores_gemma":[0.001241456,0.00015650562,0.004790925,0.0015082548,0.00061127776,0.000020755375,0.0025047665,0.98177403,0.0023248778,0.0026470132,0.00196536,0.00045475937],"about_ca_topic_score_codex":0.000024336105,"about_ca_topic_score_gemma":0.000034107237,"teacher_disagreement_score":0.8588117,"about_ca_system_score_codex":0.00022980932,"about_ca_system_score_gemma":0.00009931444,"threshold_uncertainty_score":0.9995964},"labels":[],"label_agreement":null},{"id":"W4415764146","doi":"10.29173/mocs316","title":"Research Trends in Affordable Modular Housing","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Workforce; Bridge (graph theory); Housing industry; Affordable housing; Key (lock); Thematic analysis","score_opus":0.017219948824789198,"score_gpt":0.27059377251128985,"score_spread":0.25337382368650063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764146","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9383982,0.005976747,0.0074170064,0.0008962761,0.002970464,0.0006238007,0.000030532712,0.00036988096,0.043317113],"genre_scores_gemma":[0.9899107,0.0015640678,0.0043063154,0.00006135037,0.00038796559,0.00009555985,0.000028976376,0.00008173479,0.0035633077],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9954893,0.00008559324,0.0011923396,0.0012614533,0.00074169115,0.0012296423],"domain_scores_gemma":[0.9982747,0.00006175357,0.00017373088,0.00035758823,0.00086034276,0.00027193018],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0012955779,0.00070082117,0.000805979,0.0045515164,0.00094127026,0.00096403866,0.00034801045,0.0008763237,0.00036957688],"category_scores_gemma":[0.00008385515,0.0008154221,0.0002281383,0.0053556864,0.0008898164,0.0015118121,0.00021725094,0.0017959592,0.000029871115],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022349335,0.00011942175,0.06215512,0.00092669245,0.00026935418,0.000016575195,0.00089476694,0.0019369989,0.015085395,0.13176619,0.0024405161,0.7841655],"study_design_scores_gemma":[0.009794641,0.0005828314,0.06327007,0.0053127143,0.0006644122,0.00035902273,0.037896175,0.5666509,0.055158436,0.040629834,0.21567181,0.004009115],"about_ca_topic_score_codex":0.00039711056,"about_ca_topic_score_gemma":0.00025280582,"teacher_disagreement_score":0.7801564,"about_ca_system_score_codex":0.0006967183,"about_ca_system_score_gemma":0.00015191517,"threshold_uncertainty_score":0.99942964},"labels":[],"label_agreement":null},{"id":"W4415764156","doi":"10.29173/mocs318","title":"A Rapid Literature Review of Environmental Performance of Offsite Building Construction Industry","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Greenhouse gas; Construction industry; Life-cycle assessment; Foundation (evidence); Modular construction","score_opus":0.003960116945552411,"score_gpt":0.1904519762553096,"score_spread":0.1864918593097572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764156","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86165977,0.13106203,0.0010887337,0.00020436945,0.001965091,0.00082586356,0.00020338735,0.00011350789,0.002877249],"genre_scores_gemma":[0.8213884,0.17100585,0.006881473,0.00011002213,0.0002065042,0.000038918457,0.000046460897,0.000045368815,0.00027701183],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9963077,0.000050086364,0.0017725136,0.0008173234,0.00055354886,0.00049884926],"domain_scores_gemma":[0.99808884,0.0000381238,0.0008497505,0.00033465782,0.0005011199,0.00018753043],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00049231114,0.0007281196,0.0011456308,0.0009382229,0.0003262452,0.00014631962,0.0002748331,0.0011119834,0.00038988836],"category_scores_gemma":[0.00006936936,0.00079779443,0.00035050625,0.0015647124,0.0011332721,0.0013094713,0.00014550656,0.0014386856,0.000003836138],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027305476,0.00011148394,0.09902723,0.046354603,0.0007265474,0.0000032197931,0.00045387525,0.00006524404,0.08315377,0.022609511,0.00064167834,0.74657977],"study_design_scores_gemma":[0.0083003715,0.0013494574,0.059612125,0.26599544,0.0042598196,0.0026300063,0.008163651,0.04539168,0.51444805,0.0021448063,0.08343931,0.0042652655],"about_ca_topic_score_codex":0.000008422289,"about_ca_topic_score_gemma":8.8405505e-7,"teacher_disagreement_score":0.7423145,"about_ca_system_score_codex":0.00022176413,"about_ca_system_score_gemma":0.00011841345,"threshold_uncertainty_score":0.9994473},"labels":[],"label_agreement":null},{"id":"W4415817208","doi":"10.3390/buildings15213942","title":"A Cloud-Driven Framework for Automated BIM Quantity Takeoff and Quality Control: Case Study Insights","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Scalability; Reliability (semiconductor); Takeoff; Consistency (knowledge bases); Quality (philosophy); Building information modeling; Verification and validation","score_opus":0.019605893180252118,"score_gpt":0.3030548953418662,"score_spread":0.28344900216161406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415817208","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8095534,0.0001909475,0.18825151,0.000050557093,0.0006948315,0.0004251766,0.00001257485,0.0007311737,0.00008984722],"genre_scores_gemma":[0.99432194,0.000007710669,0.005411518,0.00007257973,0.00006526547,0.000086718304,0.0000015909565,0.000011972975,0.000020721807],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933136,0.0000352391,0.00025176952,0.00018224315,0.00006812836,0.00013127174],"domain_scores_gemma":[0.9995006,0.00018997227,0.00003846189,0.00014986676,0.00007954151,0.000041576684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013182158,0.0001254961,0.0002027543,0.00009923568,0.0001447771,0.00007941682,0.000058002523,0.0001223171,0.0000064393507],"category_scores_gemma":[0.00011553664,0.00011838414,0.000043390188,0.00020506354,0.000036168203,0.00010049338,0.000013731939,0.00013634787,0.0000018765699],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001511198,0.00017388542,0.044161033,0.0003204274,0.0004769726,0.00006111063,0.0025960698,0.001916111,0.0034333065,0.9308368,0.002487631,0.013385541],"study_design_scores_gemma":[0.013347953,0.0008755583,0.0555111,0.00064700365,0.0007825955,0.0004689328,0.019504836,0.80203414,0.005892354,0.06059377,0.03838687,0.0019549115],"about_ca_topic_score_codex":0.00033260402,"about_ca_topic_score_gemma":0.00041773924,"teacher_disagreement_score":0.870243,"about_ca_system_score_codex":0.000041813317,"about_ca_system_score_gemma":0.000018588473,"threshold_uncertainty_score":0.4827565},"labels":[],"label_agreement":null},{"id":"W4415878985","doi":"10.1016/j.autcon.2025.106644","title":"Automating clash relevance filtering in BIM-based multidisciplinary coordination using machine learning","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Metadata; Context (archaeology); Identification (biology); Process (computing); Relevance (law); Software; Building information modeling; Quality (philosophy)","score_opus":0.009241363043894509,"score_gpt":0.24783937004757484,"score_spread":0.23859800700368033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415878985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8033707,0.0001240444,0.19369431,0.00008447568,0.0009818983,0.00022569421,0.0000030544134,0.0006409999,0.00087478856],"genre_scores_gemma":[0.9653876,0.000014946153,0.034425117,0.000010581825,0.000030922853,0.00005235388,0.00003895544,0.000019282466,0.000020237287],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870116,0.00010077139,0.0006073061,0.00023712001,0.00014498591,0.00020866269],"domain_scores_gemma":[0.9995144,0.00014162276,0.00011821435,0.000133186,0.00006927101,0.000023296976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026943636,0.00018008209,0.00019420519,0.0009296067,0.00014139545,0.00006648905,0.000075168886,0.00016629742,0.000038229722],"category_scores_gemma":[0.00013862895,0.00022047777,0.000043260523,0.0011020486,0.000058345453,0.0005530459,0.00002014513,0.00036255986,0.000006516499],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014403252,0.000014930312,0.13535069,0.00020432902,0.000010852042,0.0000023073464,0.00022683422,0.7140149,0.032116268,0.005774171,0.0000059157896,0.11226444],"study_design_scores_gemma":[0.0007326396,0.000009485421,0.030212838,0.0004659914,0.0000075837993,0.000014723472,0.0003310657,0.9588289,0.007872889,0.0012802951,0.000066439345,0.00017714896],"about_ca_topic_score_codex":0.000101404294,"about_ca_topic_score_gemma":0.00027105486,"teacher_disagreement_score":0.24481404,"about_ca_system_score_codex":0.00054977427,"about_ca_system_score_gemma":0.00006509963,"threshold_uncertainty_score":0.89908224},"labels":[],"label_agreement":null},{"id":"W4416091646","doi":"","title":"L’adoption du BIM en architecture : état des lieux et défis futurs","year":2025,"lang":"fr","type":"book-chapter","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Architecture; Government (linguistics); Interoperability; The Internet","score_opus":0.008335573383142137,"score_gpt":0.1996070638820928,"score_spread":0.19127149049895065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416091646","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004079155,0.0036201468,0.4554643,0.015964342,0.0010059758,0.0004015206,0.00014490813,0.00046718368,0.5188525],"genre_scores_gemma":[0.2761207,0.027960744,0.26734877,0.00044614938,0.0004030864,0.00016792702,0.0020402148,0.00030667774,0.4252057],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9954912,0.0022885955,0.00070265494,0.0006906703,0.00040335784,0.00042349915],"domain_scores_gemma":[0.9949617,0.0016142115,0.0003082785,0.00127683,0.0016275885,0.00021139673],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002504854,0.00062161667,0.00047292368,0.00043901452,0.0005484243,0.0003867627,0.0007225334,0.0007131659,0.0010123346],"category_scores_gemma":[0.00067928515,0.00069111004,0.00037498944,0.00031276824,0.00054298696,0.00026122792,0.0002705553,0.0011674142,0.00019108488],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000075553667,0.000047503745,0.00024106384,0.00017240996,0.000098656084,0.0000029370044,0.0022340037,0.0003455623,0.0006760706,0.6062296,0.00038774183,0.38955688],"study_design_scores_gemma":[0.0008803892,0.0000020747561,0.0038367796,0.0070087905,0.00030511364,0.00014649004,0.00040625274,0.014903207,0.0136362,0.0852937,0.8722802,0.0013008442],"about_ca_topic_score_codex":0.0006910222,"about_ca_topic_score_gemma":0.0038106753,"teacher_disagreement_score":0.8718924,"about_ca_system_score_codex":0.0004287338,"about_ca_system_score_gemma":0.00023920965,"threshold_uncertainty_score":0.9999009},"labels":[],"label_agreement":null},{"id":"W4416108550","doi":"10.1061/jmenea.meeng-7068","title":"Forecasting Construction Equipment Productivity Based on Weather Conditions: A Data-Driven Time-Series Machine Learning Approach","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Leverage (statistics); Construction management; Field (mathematics); Autoregressive model; Project management; Automation; Construction industry","score_opus":0.014199284189216642,"score_gpt":0.2140958393359872,"score_spread":0.19989655514677054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416108550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06942797,0.00058622466,0.9030403,0.0003024013,0.0020285985,0.0006267692,0.000019417028,0.00032010066,0.023648242],"genre_scores_gemma":[0.9474998,0.00005523147,0.05196932,0.000015034204,0.0001142897,0.00002358794,0.00003760477,0.000025202937,0.00025993533],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913657,0.00002636238,0.0003699865,0.00014186534,0.00017734316,0.00014789838],"domain_scores_gemma":[0.99963105,0.000033982367,0.00008668789,0.00018457447,0.000038218448,0.00002547099],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003625579,0.00014460227,0.00018698319,0.0005960847,0.000046273897,0.000046844474,0.00016924799,0.00004368143,0.000027722428],"category_scores_gemma":[0.000044282966,0.00014230597,0.000043371998,0.0003041701,0.000023058117,0.00038540672,0.00004023201,0.00033901533,0.0000021220949],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023275039,0.00003311132,0.0005256833,0.00021124905,0.00010474898,0.000008370264,0.00003716779,0.98172146,0.00027164427,0.001858854,0.00016503429,0.015039397],"study_design_scores_gemma":[0.0004671429,0.00003535325,0.00037824333,0.00031767887,0.000043778626,0.000025207257,0.00011353593,0.9939586,0.00029687208,0.00011470682,0.00413363,0.000115265146],"about_ca_topic_score_codex":0.0000012116017,"about_ca_topic_score_gemma":9.895599e-7,"teacher_disagreement_score":0.87807184,"about_ca_system_score_codex":0.00016328963,"about_ca_system_score_gemma":0.000012428893,"threshold_uncertainty_score":0.5803069},"labels":[],"label_agreement":null},{"id":"W4416133335","doi":"10.1177/13694332251394825","title":"Capacity and failure mode prediction of long-bolted connection in panelized modular houses","year":2025,"lang":"en","type":"article","venue":"Advances in Structural Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Lakehead University","funders":"","keywords":"Modular design; Finite element method; Moment (physics); Failure mode and effects analysis; Parametric statistics; Connection (principal bundle); Process (computing); Mode (computer interface)","score_opus":0.004198056075830747,"score_gpt":0.20673210726765942,"score_spread":0.20253405119182868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416133335","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96648145,0.0019900962,0.030501863,0.000009929613,0.0006027148,0.00011758726,0.0000134892425,0.00015410194,0.00012877186],"genre_scores_gemma":[0.9978442,0.00041705053,0.0016744493,0.0000024120047,0.000021669544,0.000018748427,0.000008313313,0.0000098533965,0.0000032829807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941134,0.000008936399,0.00025544254,0.0001290168,0.000070720256,0.00012456249],"domain_scores_gemma":[0.99982274,0.000028961393,0.000022583441,0.00008330617,0.000024916986,0.000017510285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003611717,0.00012322367,0.00017427084,0.00025043488,0.000015363978,0.000010944963,0.000048176058,0.00008441039,0.0000047299945],"category_scores_gemma":[0.000031175376,0.00012728067,0.000020487607,0.00032873795,0.000028284381,0.00042753786,0.000009735463,0.00017350577,1.0066318e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010894333,0.0000017131495,0.01634134,0.00021134806,0.0000115266475,9.3343044e-7,0.00012177467,0.9335776,0.024934657,0.0034907775,0.0000011284042,0.021296289],"study_design_scores_gemma":[0.00059964403,0.000011750431,0.100915015,0.00020289,0.000007772429,0.000013451273,0.00010708085,0.8751066,0.021440277,0.0013242989,0.00014718187,0.00012407773],"about_ca_topic_score_codex":0.00003563434,"about_ca_topic_score_gemma":0.0002644573,"teacher_disagreement_score":0.08457368,"about_ca_system_score_codex":0.000076591146,"about_ca_system_score_gemma":0.0000051081893,"threshold_uncertainty_score":0.5190355},"labels":[],"label_agreement":null},{"id":"W4416273186","doi":"10.1061/jcemd4.coeng-16899","title":"Enhancing Circularity in the Building Industry: A Review of Material Passports and Digital Twin Technologies","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; National Research Council Canada","funders":"","keywords":"Reuse; Scalability; Key (lock); Emerging technologies; The Internet; Systematic review","score_opus":0.003023970041466548,"score_gpt":0.19320125097995616,"score_spread":0.19017728093848962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416273186","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91665965,0.011118505,0.06916893,0.0005588242,0.0012752651,0.00025723784,0.0000039852216,0.00009529274,0.0008622745],"genre_scores_gemma":[0.9911651,0.0064110425,0.0023796556,0.000013892123,0.000018744338,0.0000049341916,4.1510992e-7,0.0000032490352,0.000002967894],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994829,0.0000061413925,0.0003156754,0.00004964705,0.00008213934,0.000063446845],"domain_scores_gemma":[0.99982285,0.000013514207,0.000066245724,0.000060296512,0.000027649277,0.0000094141815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021123308,0.00007078778,0.00014612847,0.00022970971,0.00001549614,0.00003684618,0.000050415056,0.00006019124,0.0000020392374],"category_scores_gemma":[0.000022859447,0.00005614909,0.000024468836,0.00019781072,0.000032214524,0.00014148762,0.000016942931,0.00018992875,2.4953241e-8],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023434854,0.000033610395,0.0061642844,0.018493624,0.0004441775,0.000057524154,0.00021024476,0.0054648314,0.0074897637,0.13603005,0.00052313827,0.8250653],"study_design_scores_gemma":[0.010271981,0.0007232736,0.17477602,0.22472087,0.002726957,0.015522518,0.04504918,0.037585523,0.11294364,0.03991793,0.33202899,0.0037331234],"about_ca_topic_score_codex":0.0000010219969,"about_ca_topic_score_gemma":3.7592434e-7,"teacher_disagreement_score":0.8213322,"about_ca_system_score_codex":0.00002315833,"about_ca_system_score_gemma":0.0000060551124,"threshold_uncertainty_score":0.22896934},"labels":[],"label_agreement":null},{"id":"W4416276869","doi":"10.2139/ssrn.5758912","title":"Transportation-induced acceleration and shear deformation responses of volumetric steel modules with light-framed gypsum walls: Road test results","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Modular design; Serviceability (structure); Accelerometer; Acceleration; Shear (geology); Truck","score_opus":0.009093066814779867,"score_gpt":0.22175700423733208,"score_spread":0.2126639374225522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416276869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.939756,0.0030387286,0.053718213,0.00054898247,0.00082772603,0.00089618686,0.00028995675,0.00012904435,0.00079517165],"genre_scores_gemma":[0.9879122,0.009410459,0.001365841,0.000013225966,0.00027712624,0.000055830104,0.00026441886,0.000053500666,0.0006474325],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9948472,0.00028529292,0.0020097506,0.00062576076,0.00075319275,0.001478841],"domain_scores_gemma":[0.99691254,0.00021295951,0.0011167199,0.0005261526,0.0010445184,0.00018713994],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0020573454,0.0006815957,0.0007555116,0.0015408299,0.0004607235,0.00034886703,0.00041007312,0.0007699618,0.000020408448],"category_scores_gemma":[0.00033025886,0.000631349,0.00020051358,0.0010426438,0.000083960644,0.0014510783,0.000016007323,0.004337171,0.000004172961],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00555129,0.00054200646,0.003984666,0.00094845734,0.0019402279,0.000006091192,0.007947944,0.04472658,0.024055108,0.041321985,0.00003695742,0.8689387],"study_design_scores_gemma":[0.022907212,0.0143830385,0.40471742,0.0064853504,0.0041717244,0.001984353,0.04869897,0.34178022,0.07864096,0.06914161,0.0013470295,0.005742147],"about_ca_topic_score_codex":0.0004315965,"about_ca_topic_score_gemma":0.00448685,"teacher_disagreement_score":0.86319655,"about_ca_system_score_codex":0.0014959319,"about_ca_system_score_gemma":0.0038127534,"threshold_uncertainty_score":0.99961376},"labels":[],"label_agreement":null},{"id":"W4416301644","doi":"10.5539/jms.v15n2p148","title":"Analysis of the Applicability of the BIM Methodology to the Management of Municipal Public Infrastructure","year":2025,"lang":"","type":"article","venue":"Journal of Management and Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interoperability; Procurement; Building information modeling; Plan (archaeology); Openness to experience; Modernization theory; Redevelopment; Public infrastructure","score_opus":0.013112434963418818,"score_gpt":0.2735442882714184,"score_spread":0.2604318533079996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416301644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9272341,0.0009861558,0.060004335,0.0072260243,0.0008229486,0.0013956623,0.000017146594,0.000005507539,0.0023080944],"genre_scores_gemma":[0.9980552,0.00030331334,0.001270986,0.00006542095,0.000022734906,0.000018387975,4.534643e-7,0.000006176603,0.00025732655],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9964935,0.0009297482,0.0015663587,0.00024436152,0.00050581095,0.00026019703],"domain_scores_gemma":[0.9966877,0.00029284414,0.0008324868,0.0011999352,0.0009321048,0.000054922002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041490314,0.00023341553,0.00075483666,0.0005174918,0.00018292198,0.00003909512,0.0010964636,0.00014430226,0.00007514055],"category_scores_gemma":[0.00025570768,0.0001225355,0.0007325367,0.0036617015,0.000598381,0.000117418975,0.00081869354,0.0004878173,4.793711e-8],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036574036,0.00025030342,0.29392797,0.005182779,0.013158216,0.0000012868126,0.0027102998,0.09802352,0.000024426143,0.30963612,0.00031953395,0.27639982],"study_design_scores_gemma":[0.0005175373,0.000072908624,0.90808415,0.00010564684,0.0055725356,0.0000018509977,0.036531035,0.005682093,0.00022617857,0.03351807,0.009577729,0.00011026171],"about_ca_topic_score_codex":0.000073226765,"about_ca_topic_score_gemma":0.00012185114,"teacher_disagreement_score":0.6141562,"about_ca_system_score_codex":0.00031825816,"about_ca_system_score_gemma":0.0001193194,"threshold_uncertainty_score":0.49968523},"labels":[],"label_agreement":null},{"id":"W4416306757","doi":"10.1108/ecam-03-2025-0385","title":"Illustrating the impact of implementing work zones, adjusting work patterns and optimizing crew starting positions to minimize spatial conflicts","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Crew; Work (physics); Workflow; Task (project management); Productivity; Cockpit; Spatial planning; Resource (disambiguation)","score_opus":0.0059245777748070105,"score_gpt":0.21984947652847028,"score_spread":0.21392489875366327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416306757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56082547,0.00008753325,0.43712136,0.000102926555,0.0004011582,0.0003442848,0.000009339185,0.00022039113,0.00088753476],"genre_scores_gemma":[0.9439995,0.000009605038,0.055730056,0.000019161931,0.000105309126,0.00006816079,0.000011091638,0.000024628564,0.000032462405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985938,0.00003164681,0.00054925535,0.00025374175,0.00016180938,0.00040976075],"domain_scores_gemma":[0.9994348,0.000117541946,0.00009485758,0.00021748502,0.000056941964,0.000078319696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001979306,0.0002793362,0.00023827182,0.00036558355,0.00025373086,0.00013477347,0.00014011213,0.00005279677,0.000037863327],"category_scores_gemma":[0.000029656958,0.00024002275,0.00011769523,0.0006798506,0.000050807987,0.00010238488,0.00012785401,0.00028617575,0.0000013257977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024424508,0.000005325458,0.006995985,0.0001911145,0.0003335801,0.0000021997332,0.0009194552,0.6663398,0.0016458964,0.002082108,0.00003865638,0.3214214],"study_design_scores_gemma":[0.0025571298,0.0001733233,0.49419442,0.004917258,0.00062915107,0.00013487319,0.009132143,0.47794762,0.007245591,0.00051444554,0.0006799979,0.0018740547],"about_ca_topic_score_codex":0.00014514332,"about_ca_topic_score_gemma":0.000015681106,"teacher_disagreement_score":0.48719844,"about_ca_system_score_codex":0.00011591376,"about_ca_system_score_gemma":0.000011167666,"threshold_uncertainty_score":0.9787844},"labels":[],"label_agreement":null},{"id":"W4416307572","doi":"10.2139/ssrn.5764142","title":"Two-Stage 3D Lift Path Planning Method for Mobile Cranes in Industrial Modular Projects","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Lift (data mining); Modular design; Motion planning; Modular construction; Graph; Path (computing); Web crawler","score_opus":0.022835708477606687,"score_gpt":0.2993323525323262,"score_spread":0.2764966440547195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416307572","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06415804,0.013145737,0.91090685,0.0001380165,0.006447592,0.003059863,0.00013957733,0.00016890222,0.0018354027],"genre_scores_gemma":[0.93869674,0.0110744275,0.034179863,0.00008366362,0.006524313,0.0020839572,0.00019581975,0.00026319682,0.006898046],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99280226,0.00048632268,0.0016723527,0.0008729834,0.000498496,0.003667583],"domain_scores_gemma":[0.99811995,0.000306063,0.000639205,0.00047132862,0.0003049073,0.00015855457],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.004775824,0.0008848266,0.0011130625,0.0011481469,0.0003984198,0.0003556628,0.00069504016,0.0012457041,0.00007672741],"category_scores_gemma":[0.0002450202,0.0009351632,0.00058405614,0.0006390208,0.000055637607,0.0003749416,0.00015396529,0.013071494,0.000005214021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005628429,0.00010970259,0.0008465076,0.00034577487,0.000974756,0.000013872648,0.0015437893,0.65403765,0.0009977542,0.0621516,0.00006321144,0.27835256],"study_design_scores_gemma":[0.012798217,0.0014255602,0.00008352369,0.0037214472,0.0007813929,0.000950211,0.021408834,0.7890355,0.0020064164,0.13842691,0.026865868,0.0024961412],"about_ca_topic_score_codex":0.0004907368,"about_ca_topic_score_gemma":0.00074412965,"teacher_disagreement_score":0.876727,"about_ca_system_score_codex":0.0038009805,"about_ca_system_score_gemma":0.009967224,"threshold_uncertainty_score":0.9993099},"labels":[],"label_agreement":null},{"id":"W4416349058","doi":"10.18280/isi.300924","title":"Recent Innovations, Challenges, and Future Directions in Building Management Systems: A Comprehensive Review","year":2025,"lang":"","type":"article","venue":"Ingénierie des systèmes d information","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Key (lock); Risk management","score_opus":0.015678923306131156,"score_gpt":0.2387277984226386,"score_spread":0.22304887511650745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416349058","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034752323,0.92683446,0.0061610467,0.0017172291,0.0049415166,0.002129771,0.00003560365,0.00029351556,0.054411624],"genre_scores_gemma":[0.04690446,0.95081556,0.0011132366,0.00031860077,0.00014654585,0.00052837125,0.00009027534,0.000016703158,0.00006623935],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974575,0.00013640673,0.0015650047,0.0002461659,0.00024701603,0.00034791816],"domain_scores_gemma":[0.9986087,0.000056030025,0.00031687954,0.0003385482,0.00061691034,0.0000629293],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0004465305,0.00037997204,0.00050747796,0.0012718023,0.00030713098,0.00027616063,0.0001442725,0.00026491823,0.00003322407],"category_scores_gemma":[0.000054836917,0.00042200607,0.000060812097,0.0019804093,0.000102806174,0.0021745139,0.000082440245,0.00040325982,0.00002134676],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011374526,0.00001484851,0.00003510053,0.019790871,0.00014011687,0.0000012728394,0.0014031128,0.00031178162,0.0000058374903,0.19936308,0.0006663096,0.7782563],"study_design_scores_gemma":[0.00058670924,0.000026316724,0.0072065163,0.017515067,0.00012404379,0.00005688933,0.0090752365,0.007703819,0.000012946355,0.0019207138,0.95540076,0.0003709484],"about_ca_topic_score_codex":0.0000458839,"about_ca_topic_score_gemma":0.000019981813,"teacher_disagreement_score":0.9547345,"about_ca_system_score_codex":0.0011011311,"about_ca_system_score_gemma":0.000085833686,"threshold_uncertainty_score":0.99982315},"labels":[],"label_agreement":null},{"id":"W4416384076","doi":"10.1061/jcemd4.coeng-16673","title":"On- and Off-Site Coordination in a Modular Construction Supply Chain: Domain-Spanning Production Flow Framing and Evaluation","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College","funders":"","keywords":"Framing (construction); Modular design; Supply chain; Production (economics); Synchronization (alternating current); Material flow; Frame (networking)","score_opus":0.0034051873053584,"score_gpt":0.1952614508077989,"score_spread":0.19185626350244048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416384076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.916718,0.0014893118,0.07923943,0.00029390407,0.0016100792,0.00027360526,0.0000012934643,0.000053616222,0.00032075457],"genre_scores_gemma":[0.98307663,0.0011306533,0.015635474,0.000013968751,0.00008435479,0.000020836176,0.0000030641029,0.000011568241,0.000023430943],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990816,0.000031934593,0.00039375966,0.00016717783,0.00020085588,0.00012466546],"domain_scores_gemma":[0.99963444,0.000027237049,0.00009770269,0.000078996134,0.000117720185,0.00004392063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004929913,0.00015486556,0.00019210366,0.0008795579,0.00007570723,0.00007543166,0.000028263465,0.00008147392,0.0000043651016],"category_scores_gemma":[0.000034515513,0.00016334448,0.000026769701,0.00029867582,0.000059570237,0.0003370044,0.00001541419,0.00021865762,2.4807366e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004803086,0.000013842044,0.0034365354,0.00038049006,0.00015222098,0.000005517723,0.00035723334,0.29888976,0.0029478231,0.039157785,0.00009933938,0.65451145],"study_design_scores_gemma":[0.0023971007,0.00010163221,0.06256968,0.0013046819,0.00018238471,0.0006068144,0.0019037693,0.9192209,0.0008438025,0.006635317,0.0038951533,0.0003387601],"about_ca_topic_score_codex":0.0000022148076,"about_ca_topic_score_gemma":0.0000034220946,"teacher_disagreement_score":0.65417266,"about_ca_system_score_codex":0.00013828976,"about_ca_system_score_gemma":0.000013256551,"threshold_uncertainty_score":0.6660995},"labels":[],"label_agreement":null},{"id":"W4416532987","doi":"10.1007/978-3-032-01078-0_26","title":"ModularBuildingPy: A Python-Based Numerical Modeling and Analysis Tool for Volumetric Modular Steel Buildings","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Serviceability (structure); Numerical models; Numerical modeling; Automation; Base (topology); Computer simulation; Design tool","score_opus":0.006309722887478918,"score_gpt":0.19652546128392206,"score_spread":0.19021573839644315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416532987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009789559,0.0040022256,0.9926099,0.000032729993,0.000492674,0.00041919074,0.000072863135,0.000484183,0.0009072846],"genre_scores_gemma":[0.92973804,0.00015906063,0.068824925,0.00006115489,0.0002563492,0.0001453927,0.00013551148,0.00018965326,0.0004899247],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981899,0.000006653161,0.00057073194,0.00058330066,0.00024815238,0.00040124438],"domain_scores_gemma":[0.9990636,0.00031011773,0.00006456439,0.00037493152,0.00010701775,0.00007976525],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017044242,0.00061526307,0.00082068786,0.0021790275,0.00006101445,0.000104508625,0.00018454573,0.0007160557,0.00003758872],"category_scores_gemma":[0.00021699327,0.00069695164,0.0003811605,0.0007393132,0.000020733825,0.000098849145,0.000035520326,0.0007649913,9.460605e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009461843,0.0000040401437,0.00007587512,0.00040131714,0.00043476632,0.0000033029207,0.000025139121,0.9698808,0.0003455426,0.004100452,0.000012710338,0.024706567],"study_design_scores_gemma":[0.00033666956,0.000021409513,0.000017625594,0.0003151317,0.0005512258,0.0000036806064,6.1621165e-7,0.9927786,0.0002711387,0.0024568094,0.0026046194,0.0006424851],"about_ca_topic_score_codex":0.00001736879,"about_ca_topic_score_gemma":0.000056653644,"teacher_disagreement_score":0.9287591,"about_ca_system_score_codex":0.0003136175,"about_ca_system_score_gemma":0.000046101828,"threshold_uncertainty_score":0.99954814},"labels":[],"label_agreement":null},{"id":"W4416532992","doi":"10.1007/978-3-032-01078-0","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 14","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.0045960466164519185,"score_gpt":0.17565600811361562,"score_spread":0.1710599614971637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416532992","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001561437,0.010195182,0.71381676,0.0012595088,0.025254263,0.005846994,0.0028449444,0.0021816948,0.2370392],"genre_scores_gemma":[0.938076,0.00021055616,0.0078245485,0.00017334314,0.0015762724,0.0005552635,0.00015364145,0.0004014151,0.051028937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983983,0.0000021331925,0.00048295915,0.00034797608,0.00024859965,0.00052003993],"domain_scores_gemma":[0.99916106,0.00013353175,0.00008040695,0.00022545567,0.00029463234,0.0001048839],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015489885,0.00052462996,0.0005123939,0.0003651918,0.0000770175,0.000087905064,0.00043058736,0.0008926487,0.00009713148],"category_scores_gemma":[0.00020952598,0.0005097718,0.00039009692,0.0004206704,0.00004760724,0.00013387104,0.000048093036,0.0012322821,0.0000016976802],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061545798,0.000007840723,0.00020498787,0.0042884806,0.00040140678,0.0000013938076,0.0018786665,0.92675376,0.0012702702,0.008325751,0.051292814,0.0055684485],"study_design_scores_gemma":[0.00045944643,0.00003268629,0.00023969775,0.0028637552,0.00016279063,0.00001881368,0.00002709145,0.67351395,0.0025052545,0.001896516,0.31722307,0.0010569385],"about_ca_topic_score_codex":0.00059382926,"about_ca_topic_score_gemma":0.0875893,"teacher_disagreement_score":0.93651456,"about_ca_system_score_codex":0.0009876904,"about_ca_system_score_gemma":0.00057610543,"threshold_uncertainty_score":0.9997354},"labels":[],"label_agreement":null},{"id":"W4416534340","doi":"10.1007/978-3-031-95107-7","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 9","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.0046220281266953515,"score_gpt":0.17576286900746677,"score_spread":0.17114084088077142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416534340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017393451,0.0105864005,0.7033137,0.0012680907,0.024291174,0.0060251975,0.0029384186,0.0021994712,0.24763823],"genre_scores_gemma":[0.94453245,0.00019631795,0.0074953055,0.00016012025,0.001480113,0.00052067,0.0001409502,0.0003739342,0.04510016],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984608,0.0000019650367,0.00046717393,0.00033422757,0.00023434134,0.00050146424],"domain_scores_gemma":[0.9992162,0.00012754026,0.00007687173,0.00021723623,0.00026208747,0.00010009509],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014518904,0.00050547934,0.00049461005,0.00035598205,0.000073587405,0.00008361573,0.00041837766,0.0008503041,0.000094325056],"category_scores_gemma":[0.00018384111,0.0004899988,0.00038064996,0.00040939753,0.000045844918,0.00012904948,0.000046087735,0.001167439,0.0000015836266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005752475,0.0000075377106,0.00021649798,0.004230185,0.00039074832,0.0000013068023,0.0018375975,0.93256027,0.0013140929,0.008831947,0.04502902,0.005575034],"study_design_scores_gemma":[0.00042294245,0.00003074311,0.0002572578,0.0027737382,0.00015459977,0.000017635743,0.000027787046,0.6989117,0.0024424177,0.0019143529,0.29204094,0.0010058758],"about_ca_topic_score_codex":0.00061890634,"about_ca_topic_score_gemma":0.08688708,"teacher_disagreement_score":0.9427931,"about_ca_system_score_codex":0.0009765345,"about_ca_system_score_gemma":0.00057415926,"threshold_uncertainty_score":0.99975514},"labels":[],"label_agreement":null},{"id":"W4416570692","doi":"10.1007/978-3-031-95421-4_7","title":"Computer Vision-Based Work Productivity Optimization with Lean Principles and Simulation Method","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workflow; Lean manufacturing; Productivity; Automation; Work (physics); Lean project management; Lean laboratory; Production (economics)","score_opus":0.007275662048574258,"score_gpt":0.2115994374729269,"score_spread":0.20432377542435265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416570692","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000086039436,0.0004828635,0.99480975,0.000049208033,0.00042149157,0.00032643488,0.000006927395,0.000384541,0.0034327442],"genre_scores_gemma":[0.5685575,0.000045774545,0.42968675,0.000046371268,0.00053608796,0.00004214277,0.00012266802,0.00017577292,0.0007869225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902207,0.0000092816745,0.00026942976,0.00036670003,0.00016215554,0.0001703749],"domain_scores_gemma":[0.99925846,0.00033595352,0.000056346333,0.00023922813,0.00007053538,0.00003946767],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00012011832,0.00038305114,0.00032715843,0.00040120378,0.00003892606,0.000060610102,0.000070783084,0.00035906013,0.00003814446],"category_scores_gemma":[0.000044598288,0.00036490534,0.00004627936,0.00016949096,0.000024798854,0.000101236474,0.000020855312,0.0005555523,8.3311164e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016711108,0.0000034008644,0.00005117384,0.0002446217,0.00003739401,0.000002734233,0.000038196962,0.9397222,0.000018036004,0.0010270864,0.000005190785,0.058833245],"study_design_scores_gemma":[0.00020480667,0.000032222008,0.00008253226,0.00093890075,0.000037058257,0.000004632883,2.3445509e-7,0.9952503,0.00021516305,0.00025775156,0.002616007,0.00036038164],"about_ca_topic_score_codex":0.0000028930367,"about_ca_topic_score_gemma":0.0001163126,"teacher_disagreement_score":0.5684715,"about_ca_system_score_codex":0.00014609771,"about_ca_system_score_gemma":0.000033544686,"threshold_uncertainty_score":0.9998803},"labels":[],"label_agreement":null},{"id":"W4416570694","doi":"10.1007/978-3-031-95421-4","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 8","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004617902705697701,"score_gpt":0.1757244290953608,"score_spread":0.1711065263896631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416570694","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001744761,0.010581003,0.7023551,0.0012672691,0.024275284,0.006022908,0.0029373772,0.0021856218,0.2486307],"genre_scores_gemma":[0.94436854,0.0001939027,0.0074870866,0.00015977117,0.0014766508,0.00052267563,0.00014061527,0.0003728797,0.04527787],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846077,0.0000019651015,0.00046717617,0.00033426002,0.00023431535,0.000501501],"domain_scores_gemma":[0.9992161,0.00012755707,0.0000768799,0.00021729028,0.00026210077,0.00010010633],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014521419,0.00050553033,0.00049467635,0.00035591147,0.00007358396,0.00008362983,0.00041863223,0.00085042196,0.00009468597],"category_scores_gemma":[0.00018384904,0.0004900476,0.00038065767,0.00040920943,0.0000458458,0.00012903534,0.000046098314,0.0011677917,0.0000015892172],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057508155,0.000007535129,0.00021502284,0.0042292387,0.00039069486,0.0000013066372,0.0018370906,0.93240297,0.0013050775,0.008933262,0.044978052,0.0056939935],"study_design_scores_gemma":[0.0004232149,0.00003080147,0.00025564604,0.0027746742,0.00015466198,0.000017642124,0.000027790074,0.6991272,0.0024707853,0.0019146187,0.2917966,0.0010063425],"about_ca_topic_score_codex":0.00062904693,"about_ca_topic_score_gemma":0.08699048,"teacher_disagreement_score":0.9426238,"about_ca_system_score_codex":0.0009767042,"about_ca_system_score_gemma":0.00057443534,"threshold_uncertainty_score":0.99975514},"labels":[],"label_agreement":null},{"id":"W4416570770","doi":"10.1007/978-3-031-95421-4_20","title":"Experimental Investigation of Durable Wood Panels for the Design of Relocatable Modular Buildings","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular design; Reuse; Durability; Component (thermodynamics); Connection (principal bundle); Construction industry; Modular construction","score_opus":0.013193944162442269,"score_gpt":0.1977172981584547,"score_spread":0.18452335399601244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416570770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00034325724,0.005291892,0.9918659,0.000024014143,0.0005645636,0.0005096531,0.000024655683,0.000095049385,0.0012810138],"genre_scores_gemma":[0.9807703,0.00020654644,0.017983954,0.000015188814,0.00012004279,0.0001310668,0.000028951727,0.000083543506,0.0006603909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999125,0.000004986172,0.00040209063,0.00017418622,0.00013699969,0.00015673043],"domain_scores_gemma":[0.99918026,0.00040300033,0.00008509632,0.00024297106,0.00006692448,0.0000217678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013808583,0.0002627447,0.0003314956,0.00023660657,0.000025957965,0.000013449557,0.00016401174,0.00030777554,0.00003339472],"category_scores_gemma":[0.00008058756,0.00023646251,0.000096734926,0.00010843428,0.000040962408,0.00007310228,0.000019059516,0.00030473105,4.3494518e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008526415,0.0000019536637,0.0000037409984,0.00038809574,0.000079503974,2.6726465e-7,0.00020307906,0.888037,0.097611226,0.011355321,0.00004850923,0.0022627467],"study_design_scores_gemma":[0.00023276507,0.000036895963,0.000007333017,0.00077591196,0.000050484432,0.000004207094,0.000007949618,0.4481228,0.5436596,0.0053263884,0.0015382952,0.00023732347],"about_ca_topic_score_codex":0.000014744545,"about_ca_topic_score_gemma":0.000009706915,"teacher_disagreement_score":0.9804271,"about_ca_system_score_codex":0.00011301903,"about_ca_system_score_gemma":0.000041537136,"threshold_uncertainty_score":0.9642661},"labels":[],"label_agreement":null},{"id":"W4416737649","doi":"10.3846/jcem.2025.25213","title":"Identifying cyber risk factors associated with construction projects","year":2025,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Tamkeen; York University; New York University Abu Dhabi","keywords":"Risk management; Checklist; Risk assessment; Set (abstract data type); Risk management framework; Risk management plan; IT risk management; Expert elicitation","score_opus":0.007629885064501771,"score_gpt":0.19245803612367987,"score_spread":0.1848281510591781,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416737649","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7168265,0.00061166385,0.2752388,0.000028969698,0.0014968796,0.00013609446,0.000002436744,0.00015384755,0.005504756],"genre_scores_gemma":[0.99841136,0.00045051938,0.0009892033,0.000003874854,0.000026526299,0.000003427476,0.0000010062461,0.000009444581,0.00010464698],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99952066,0.000008177821,0.00020069239,0.000058976362,0.00011437425,0.00009711209],"domain_scores_gemma":[0.99977463,0.000020847974,0.00007239039,0.000052126907,0.0000501883,0.000029820329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000116609306,0.00009927799,0.00012762051,0.0002904284,0.000040168605,0.00005437427,0.000041546744,0.000038066715,0.000006700109],"category_scores_gemma":[0.000015240588,0.00008019304,0.000034818746,0.00020596373,0.000014278458,0.00014973612,0.000009588655,0.000158756,2.3248286e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065150256,0.000102494836,0.05504777,0.0015805817,0.0065308744,0.000059655824,0.0016663107,0.75759006,0.002243722,0.061827987,0.0059740827,0.1073113],"study_design_scores_gemma":[0.009258564,0.0005347198,0.62102246,0.008568161,0.003338842,0.00024327452,0.0105588855,0.27868974,0.011827682,0.0037591467,0.0501418,0.0020567263],"about_ca_topic_score_codex":0.000002343224,"about_ca_topic_score_gemma":0.000025414589,"teacher_disagreement_score":0.56597465,"about_ca_system_score_codex":0.00006810254,"about_ca_system_score_gemma":0.0000067209676,"threshold_uncertainty_score":0.3270177},"labels":[],"label_agreement":null},{"id":"W4416771876","doi":"10.3390/buildings15234242","title":"A GPS-Integrated IoT Framework for Real-Time Monitoring of Prefabricated Building Modules During Transportation","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; University of New Brunswick","funders":"","keywords":"Modular design; Global Positioning System; Geospatial analysis; Cloud computing; Visibility; Field (mathematics); Data acquisition; TRACE (psycholinguistics); Acceleration","score_opus":0.006885914224565573,"score_gpt":0.2359288477507889,"score_spread":0.22904293352622332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416771876","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8173715,0.00012913841,0.18118547,0.000027707678,0.00039510734,0.00022760153,0.000025501635,0.00041796482,0.00022001732],"genre_scores_gemma":[0.89497197,0.00006155866,0.10463659,0.000002388226,0.00007203768,0.00008220894,0.000013601846,0.000027972295,0.00013170479],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9990926,0.000009222202,0.00038429676,0.00020226404,0.0001069485,0.00020471458],"domain_scores_gemma":[0.9995072,0.00008056477,0.00007548805,0.00015394807,0.0001463118,0.00003651984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000080634745,0.00016874383,0.00022857098,0.00023906623,0.00008776607,0.000031798187,0.0001252845,0.00017229887,0.000018875202],"category_scores_gemma":[0.000050015875,0.00017823446,0.00010186674,0.0004945087,0.00003091273,0.000110938425,0.0000042931174,0.00014808103,0.0000017090539],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056377292,0.000016371729,0.004465064,0.0003163953,0.000108066364,4.7667268e-7,0.00028510726,0.010850225,0.93532044,0.03506122,0.00010286349,0.013417373],"study_design_scores_gemma":[0.0005270632,0.00002641998,0.043119688,0.000960624,0.00008973826,0.000001800489,0.0002706655,0.015087245,0.92965555,0.009271517,0.000739219,0.00025045167],"about_ca_topic_score_codex":0.00006590574,"about_ca_topic_score_gemma":0.0000029196362,"teacher_disagreement_score":0.07760045,"about_ca_system_score_codex":0.00011189659,"about_ca_system_score_gemma":0.00002197358,"threshold_uncertainty_score":0.72681904},"labels":[],"label_agreement":null},{"id":"W4416947709","doi":"10.1108/ecam-04-2025-0645","title":"Scan-to-BIM approach for enhanced semi-automated cost management in modular off-site construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure; National Research Council Canada","funders":"Mitacs","keywords":"Modular design; Cost estimate; Prefabrication; Cost efficiency; Cost driver; Modular programming; Cost accounting; Cost reduction; Lean manufacturing","score_opus":0.0038265241752745375,"score_gpt":0.20396387286185955,"score_spread":0.200137348686585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416947709","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15266228,0.000121401004,0.8331438,0.00008701632,0.0021012605,0.0021702934,0.000023221966,0.0018165496,0.00787419],"genre_scores_gemma":[0.8168467,0.000068299385,0.18136312,0.000054803415,0.00008397421,0.0012221761,0.000093787196,0.000049242335,0.00021784374],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980627,0.000025456155,0.0006036663,0.00054853386,0.00023162825,0.0005280478],"domain_scores_gemma":[0.9993676,0.000031459997,0.00005571827,0.0003773634,0.00006209142,0.00010575075],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00015939336,0.0004211032,0.00034843988,0.0013581224,0.00011965188,0.00011168687,0.00021576376,0.00012299804,0.0000191878],"category_scores_gemma":[0.000011629779,0.00047331245,0.00013011413,0.0011870944,0.000067981404,0.00016501863,0.000080177066,0.00026753292,0.000013480066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039905983,0.0000128284,0.00007786324,0.00044356237,0.00020849433,0.0000022013874,0.00006997721,0.7069319,0.0027594734,0.027626898,0.00012280712,0.2617041],"study_design_scores_gemma":[0.0017818817,0.00003207544,0.0046593943,0.0002964237,0.00011094242,0.000051690848,0.000520337,0.9744852,0.006999024,0.00069872924,0.009719726,0.0006445658],"about_ca_topic_score_codex":0.000009689149,"about_ca_topic_score_gemma":0.000009625154,"teacher_disagreement_score":0.66418445,"about_ca_system_score_codex":0.00045513618,"about_ca_system_score_gemma":0.000011363857,"threshold_uncertainty_score":0.99977183},"labels":[],"label_agreement":null},{"id":"W4417150931","doi":"10.3846/jcem.2025.24043","title":"Autonomous modular construction strategy using robotized crane based on deep learning and reinforcement learning","year":2025,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Modular design; Reinforcement learning; Container (type theory); Kinematics; Robot; Motion planning; Field (mathematics); Modular construction","score_opus":0.004542816664117812,"score_gpt":0.19533897637398742,"score_spread":0.1907961597098696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417150931","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042635627,0.00075171917,0.95144814,0.000040008304,0.00055702485,0.00010635012,1.1893507e-7,0.00010508476,0.004355908],"genre_scores_gemma":[0.99447083,0.00060508616,0.0047405446,0.000011463388,0.00004318048,0.0000033297772,0.0000010406912,0.0000133262965,0.00011122067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932736,0.0000156483,0.00030361602,0.000091847105,0.0001284343,0.00013306449],"domain_scores_gemma":[0.9997592,0.000023493763,0.00007447248,0.000050533,0.000042432723,0.00004989612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018288755,0.00013888747,0.00018094626,0.00038623434,0.00008603795,0.00007573551,0.00003596547,0.000051971827,0.000016573538],"category_scores_gemma":[0.00001256917,0.00013847234,0.000043176173,0.00013387427,0.00001940726,0.00013437029,0.00001325806,0.00028162182,3.0503725e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001625255,0.0000043307778,0.000102110906,0.00021049635,0.00009910206,0.0000073096603,0.000025064708,0.96023494,0.001162446,0.004240725,0.0000069036705,0.033890326],"study_design_scores_gemma":[0.0007431505,0.000086193424,0.00045856135,0.00030264645,0.00008159905,0.00003227783,0.00021302009,0.9945517,0.00024382076,0.00006721432,0.0031033335,0.00011647434],"about_ca_topic_score_codex":0.0000022453032,"about_ca_topic_score_gemma":0.0000021931132,"teacher_disagreement_score":0.95183516,"about_ca_system_score_codex":0.00008868711,"about_ca_system_score_gemma":0.00000917654,"threshold_uncertainty_score":0.56467384},"labels":[],"label_agreement":null},{"id":"W4417229627","doi":"10.1061/9780784486139.014","title":"Developing Virtual Reality Workflow for Panelized Construction Assembly Training","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prefabrication; Workflow; Virtual reality; Training (meteorology); Focus (optics); Commodity","score_opus":0.04459212585407773,"score_gpt":0.28476699177313747,"score_spread":0.24017486591905973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417229627","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010586003,0.0002341026,0.94745535,0.0015738477,0.007961782,0.00065925706,0.00002960383,0.00049280486,0.031007245],"genre_scores_gemma":[0.87822706,0.0002189335,0.11767816,0.0002755796,0.00044075403,0.00019783562,0.00005934425,0.000041113235,0.0028612302],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977596,0.00007926251,0.0009519359,0.00050325826,0.00018539578,0.00052056264],"domain_scores_gemma":[0.9988673,0.00030167465,0.00012598281,0.00028571763,0.00032721966,0.00009215012],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00046508593,0.00039447474,0.0005013101,0.0003230209,0.00042580106,0.00025914607,0.00017191168,0.00047617388,0.00022312782],"category_scores_gemma":[0.00019778516,0.0004330393,0.00023873975,0.0005659881,0.00014273239,0.00038116812,0.000032799748,0.00033987785,0.000017070335],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006831455,0.0000064276155,0.000051514515,0.00010417049,0.00016774991,3.0462533e-7,0.00037032427,0.001072099,0.001129223,0.4628882,0.0006536802,0.533488],"study_design_scores_gemma":[0.008312018,0.00025269896,0.002246194,0.0025549938,0.0007687016,0.0001177173,0.030739155,0.5660659,0.04580954,0.15319924,0.18733226,0.0026015611],"about_ca_topic_score_codex":0.000048079914,"about_ca_topic_score_gemma":0.00013177679,"teacher_disagreement_score":0.86764103,"about_ca_system_score_codex":0.0004561522,"about_ca_system_score_gemma":0.0005985148,"threshold_uncertainty_score":0.9998121},"labels":[],"label_agreement":null},{"id":"W4417229862","doi":"10.1061/9780784486122.022","title":"Comparison of Two Simulation Platforms Based on Learning and Application Experiences of a Civil Engineering Trainee: SDESA versus SIMPHONY","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Discrete event simulation; Simulation modeling; Software; Simulation software; Event (particle physics); Learning curve","score_opus":0.01295091408086762,"score_gpt":0.29100111332083095,"score_spread":0.2780501992399633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417229862","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46255422,0.00022393872,0.53342825,0.000009515092,0.00043439894,0.00023958685,0.0000021582766,0.00008203516,0.0030259218],"genre_scores_gemma":[0.99858814,0.000015490465,0.0012380858,0.000004539796,0.000034558943,0.00005392487,0.000014416215,0.000015541496,0.00003531672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99862015,0.000014464506,0.00070158823,0.00025440354,0.00023316455,0.00017623838],"domain_scores_gemma":[0.99901325,0.00047694915,0.00018123712,0.00016129293,0.00011768797,0.000049566763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015491582,0.00023799717,0.0003864716,0.00038124376,0.00008130035,0.000030654195,0.00008592328,0.00016234562,0.00014948337],"category_scores_gemma":[0.00010552955,0.00024048165,0.00008140466,0.0005557318,0.00008788823,0.00018193375,0.000016289812,0.00024535344,0.0000012289476],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018103463,0.000046516696,0.0014086606,0.00025171824,0.000045572957,5.119759e-8,0.004002612,0.93748575,0.007097655,0.007555512,0.0000047837266,0.04192016],"study_design_scores_gemma":[0.0015570148,0.00022381746,0.0003979208,0.00019870275,0.00005019831,1.6110725e-7,0.010232749,0.9508554,0.036030225,0.00006140514,0.00021553661,0.00017688402],"about_ca_topic_score_codex":0.000027855618,"about_ca_topic_score_gemma":0.00004394116,"teacher_disagreement_score":0.5360339,"about_ca_system_score_codex":0.00008009663,"about_ca_system_score_gemma":0.000049107428,"threshold_uncertainty_score":0.98065567},"labels":[],"label_agreement":null},{"id":"W4417318362","doi":"10.69709/susproc.2025.155435","title":"Data Delivery for Standardizing Sustainable Whole-Building Lifecycle Assessment Using the Proposed OpenBIM Framework","year":2025,"lang":"en","type":"article","venue":"Sustainable Processes Connect","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; National Research Council Canada","funders":"National Research Council Canada","keywords":"Standardization; Consistency (knowledge bases); Reliability (semiconductor); Redundancy (engineering); Key (lock); Data modeling; Baseline (sea); Data exchange","score_opus":0.019920491559240385,"score_gpt":0.3114628977154385,"score_spread":0.29154240615619814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417318362","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040605906,0.004128783,0.9482242,0.0008651352,0.00046717605,0.002008607,0.00007565754,0.0004718948,0.0031526543],"genre_scores_gemma":[0.9788422,0.00009549565,0.018646467,0.00017546519,0.00019086797,0.0002292206,0.000065417626,0.00005900283,0.001695843],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99799067,0.0000580686,0.00040922352,0.00048389717,0.00024784956,0.00081029296],"domain_scores_gemma":[0.99728113,0.00051746465,0.0000967937,0.00075858424,0.0012816468,0.00006435111],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009021466,0.0002977847,0.00031294246,0.00022932675,0.0011228872,0.00079964526,0.0008142601,0.00016782068,0.000025886296],"category_scores_gemma":[0.0010959947,0.00024688643,0.00006361777,0.0012327352,0.0001012924,0.0012933917,0.00035853,0.00038553614,9.700694e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025393598,0.000100259276,0.0010496514,0.018058736,0.00073024625,0.000053954784,0.0008961301,0.08210989,0.003402734,0.860286,0.011819843,0.021238638],"study_design_scores_gemma":[0.0014896961,0.000121764424,0.000053332158,0.0008468116,0.00041621877,0.000021744518,0.101371236,0.26332915,0.017498301,0.12669665,0.48717144,0.0009836663],"about_ca_topic_score_codex":0.00008608193,"about_ca_topic_score_gemma":0.000023703027,"teacher_disagreement_score":0.9382363,"about_ca_system_score_codex":0.0006326649,"about_ca_system_score_gemma":0.0016837155,"threshold_uncertainty_score":0.99999833},"labels":[],"label_agreement":null},{"id":"W52441173","doi":"10.22260/isarc2014/0036","title":"Post-Simulation Visualization Application for Production Improvement of Modular Construction Manufacturing","year":2014,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Computer science; Context (archaeology); Process (computing); Lean manufacturing; Discrete event simulation; Production (economics); Material flow; Production planning; Industrial engineering; Manufacturing engineering; Simulation; Engineering; Data mining","score_opus":0.005289366042261784,"score_gpt":0.21063486904507633,"score_spread":0.20534550300281454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W52441173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8948957,0.000013010488,0.10324972,0.00008403148,0.00048452057,0.0006759861,0.0000062128006,0.00009630679,0.0004945437],"genre_scores_gemma":[0.99795794,0.000005974266,0.0017298786,0.000008805744,0.00015244345,0.00008283008,0.000009419438,0.000018933893,0.00003374643],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99926966,0.000002727174,0.00031988235,0.00014681323,0.00016557763,0.00009534753],"domain_scores_gemma":[0.99925375,0.000014552115,0.00021077711,0.000090370995,0.0004136512,0.000016908678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018391923,0.00010197807,0.000120105826,0.00009455264,0.00007176208,0.000012802277,0.00009767592,0.000071749484,0.0000035408248],"category_scores_gemma":[0.00006749664,0.00008725534,0.00006663567,0.0001214872,0.000064254295,0.00025418875,0.000014393386,0.000052959567,7.1343845e-7],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026377913,0.000014581019,0.00069755205,0.0003907901,0.00002203479,3.9765183e-10,0.00020559713,0.02845622,0.86479294,0.018054,0.00002596554,0.08731394],"study_design_scores_gemma":[0.00017548233,0.000048211317,0.0013104349,0.000038164813,0.000031469826,0.0000014951928,0.00023537275,0.16644995,0.8254162,0.0056208856,0.0005934588,0.0000788387],"about_ca_topic_score_codex":0.000007186316,"about_ca_topic_score_gemma":0.0000016775977,"teacher_disagreement_score":0.13799374,"about_ca_system_score_codex":0.00005376056,"about_ca_system_score_gemma":0.000006483054,"threshold_uncertainty_score":0.35581696},"labels":[],"label_agreement":null},{"id":"W52574272","doi":"10.22260/isarc2013/0091","title":"Automated Development of Construction Schedules Using Onsite Data Acquisition","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Download; Schedule; Documentation; SQL; Database; Benchmarking; Software; Server; Scheduling (production processes); Software engineering; Operating system","score_opus":0.022671815935721353,"score_gpt":0.22956041958331563,"score_spread":0.2068886036475943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W52574272","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9968621,0.00005533867,0.0012154033,0.000037069458,0.00026822963,0.00015338561,0.000007942776,0.00019895357,0.0012015658],"genre_scores_gemma":[0.93099916,0.000004004291,0.068929024,0.000005762907,0.000030764844,0.000005830731,0.000006492496,0.000010669612,0.000008322355],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99934995,0.000002418552,0.00028807382,0.00010769688,0.00015322909,0.00009863633],"domain_scores_gemma":[0.9995023,0.000006846418,0.00012346658,0.00011405705,0.00023178334,0.00002155183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009663538,0.00008884898,0.00011316313,0.000077274424,0.00006744224,0.000028103534,0.00022874563,0.00006204077,0.000055326847],"category_scores_gemma":[0.000018851273,0.0000706858,0.000024156016,0.00020105115,0.00008862614,0.00048988895,0.00008301485,0.00007302007,0.0000073890965],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006861608,0.00001810674,0.008317095,0.0002829338,0.000088549576,1.5133999e-8,0.00049291307,0.00031320076,0.95227855,0.007435576,0.0006710083,0.03009521],"study_design_scores_gemma":[0.00024313506,0.000008708272,0.015925745,0.00029858577,0.000044524342,0.000039962113,0.0014471376,0.29836383,0.6811718,0.0020170545,0.0002593489,0.00018019731],"about_ca_topic_score_codex":0.000016875038,"about_ca_topic_score_gemma":0.0000013006088,"teacher_disagreement_score":0.2980506,"about_ca_system_score_codex":0.000043244803,"about_ca_system_score_gemma":0.000026504713,"threshold_uncertainty_score":0.28824833},"labels":[],"label_agreement":null},{"id":"W569224618","doi":"","title":"Construction Research Congress 2010 : innovation for reshaping construction practice : proceedings of the 2010 Construction Research Congress, May 8-10, 2010, Banff, Alberta, Canada","year":2010,"lang":"en","type":"book","venue":"American Society of Civil Engineers eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Library science; Political science; Engineering; Public administration; Computer science","score_opus":0.0265850573071109,"score_gpt":0.278180885158776,"score_spread":0.25159582785166507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W569224618","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03976852,0.0014587145,0.0057944534,0.008022721,0.07190026,0.015619559,0.002746301,0.0012189541,0.8534705],"genre_scores_gemma":[0.10736919,0.0011846833,0.0752855,0.00053814444,0.005083799,0.002172069,0.0010473101,0.0013134681,0.80600584],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943242,0.00013835182,0.0016552123,0.0008195624,0.0020939352,0.0009687062],"domain_scores_gemma":[0.98743117,0.0017419816,0.0014523475,0.0007107061,0.008480202,0.00018360418],"candidate_categories":["metaepi_narrow","sts","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0023195338,0.0007159342,0.0010667627,0.0007376196,0.00068403647,0.00015352806,0.00075052946,0.0011164715,0.00016381076],"category_scores_gemma":[0.00091707765,0.0007156065,0.00041134108,0.0012666545,0.0075071217,0.00046496757,0.00014795708,0.0040863375,0.000004853875],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019211555,0.000023901966,0.00012279442,0.0015637171,0.00082655554,5.542589e-7,0.0009663745,0.00024678404,0.015406609,0.065583944,0.89001757,0.025049103],"study_design_scores_gemma":[0.001696613,0.00032433672,0.00011279842,0.001620617,0.0003921588,0.00035154508,0.019703249,0.004980028,0.038668327,0.004524106,0.9262757,0.0013505584],"about_ca_topic_score_codex":0.044459205,"about_ca_topic_score_gemma":0.047716957,"teacher_disagreement_score":0.06949104,"about_ca_system_score_codex":0.0012777837,"about_ca_system_score_gemma":0.0036085646,"threshold_uncertainty_score":0.9995295},"labels":[],"label_agreement":null},{"id":"W573351360","doi":"","title":"Project Management Software","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Software project management; Computer science; Project management; Software; Project management triangle; Software engineering; Software development; Engineering management; Software construction; Process management; Systems engineering; Engineering; Operating system","score_opus":0.012064288958577897,"score_gpt":0.2496268575771849,"score_spread":0.237562568618607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W573351360","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.52847606,0.0019953686,0.037014253,0.016476741,0.0013242101,0.0012145708,0.00093439757,0.0016257538,0.41093865],"genre_scores_gemma":[0.9965528,0.00024896584,0.0021315608,0.00043808558,0.00021909719,0.000028377919,0.000029180752,0.0000079675565,0.0003439407],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993233,0.000013172863,0.00017455065,0.000115551535,0.00009209101,0.00028130802],"domain_scores_gemma":[0.99973613,0.000011381901,0.000016103344,0.00012338182,0.0000348174,0.00007820971],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004203039,0.000104437946,0.00008153275,0.00022600681,0.00006192692,0.000095628166,0.00007717864,0.000059707312,0.000018498664],"category_scores_gemma":[0.000026852349,0.000114343275,0.000025503638,0.0003420448,0.00006873301,0.00021426374,0.000025968364,0.00006640561,0.00002093422],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[5.3438725e-7,0.000013908899,0.008084412,0.000024806179,0.00002077445,8.2192906e-7,0.00007641683,0.0002360707,6.4101835e-7,0.8881968,0.004407961,0.098936796],"study_design_scores_gemma":[0.0011795468,0.0000232189,0.11724031,0.000038140617,0.000026389804,0.000102241705,0.0011646523,0.03594576,0.0000407255,0.02045714,0.8232823,0.0004995826],"about_ca_topic_score_codex":0.0009040657,"about_ca_topic_score_gemma":0.00026900336,"teacher_disagreement_score":0.86773974,"about_ca_system_score_codex":0.00035344518,"about_ca_system_score_gemma":0.00008354586,"threshold_uncertainty_score":0.46627834},"labels":[],"label_agreement":null},{"id":"W575637696","doi":"","title":"Streamlining the Bridge Design Process","year":2006,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Deliverable; Computer science; Process (computing); Software engineering; Automation; Software; Engineering design process; Quality (philosophy); Engineering drawing; Systems engineering; Engineering; Programming language","score_opus":0.0173698152252084,"score_gpt":0.25382050756088703,"score_spread":0.23645069233567864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W575637696","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8680904,0.0007792382,0.055685226,0.0093131345,0.00060584187,0.00048290798,0.00031421008,0.00047108845,0.064257935],"genre_scores_gemma":[0.99915385,0.000045774927,0.00015717493,0.00023690559,0.00028593233,0.000025524929,0.000024676066,0.000008801275,0.000061346276],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.999217,0.00003319931,0.00021596416,0.00011685038,0.00010875422,0.0003082421],"domain_scores_gemma":[0.9996519,0.00005518659,0.00002898228,0.0001301935,0.00006875819,0.00006498902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009700173,0.00011801084,0.000091486065,0.00011819635,0.00013039092,0.00016427219,0.00011027129,0.00006968297,0.000010082931],"category_scores_gemma":[0.00006476893,0.00010316637,0.00002572261,0.00040831516,0.00014178957,0.00019205797,0.000014427046,0.00010074418,0.0000076009437],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[9.357825e-7,0.000014028014,0.023876099,0.000013900939,0.000012085094,8.279581e-7,0.000103757666,0.0033621632,0.0000047880812,0.96048254,0.0020157183,0.010113173],"study_design_scores_gemma":[0.0011013059,0.000036832804,0.5798782,0.000041610714,0.000033728753,0.00017589265,0.001306751,0.20369321,0.000270831,0.18838894,0.024502266,0.0005704482],"about_ca_topic_score_codex":0.0046812813,"about_ca_topic_score_gemma":0.0003452149,"teacher_disagreement_score":0.7720936,"about_ca_system_score_codex":0.00017918416,"about_ca_system_score_gemma":0.00018930672,"threshold_uncertainty_score":0.70767283},"labels":[],"label_agreement":null},{"id":"W575840679","doi":"","title":"The proceedings of the 2000 Summer Computer Simulation Conference , Vancouver, British Columbia, Canada, July 16-20, 2000, the Coast Plaza Suite Hotel","year":2000,"lang":"en","type":"book","venue":"Society for Computer Simulation International eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Suite; Geography; Meteorology; Archaeology; Library science; History; Computer science","score_opus":0.008589957457182011,"score_gpt":0.19486939186072744,"score_spread":0.1862794344035454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W575840679","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019351555,0.0011600885,0.58924997,0.00085536484,0.066145495,0.012944484,0.010151369,0.0013559653,0.29878575],"genre_scores_gemma":[0.40925688,0.000047978443,0.0014113666,0.0011731758,0.0038161967,0.00018889677,0.00053253013,0.00018306548,0.58338994],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99746454,0.000020546235,0.0008771364,0.00040812665,0.0008997375,0.00032993703],"domain_scores_gemma":[0.9973813,0.0005239228,0.00047658227,0.00027161973,0.0012786073,0.00006792791],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0002240466,0.00036191125,0.00035040575,0.000032012947,0.0006837699,0.000756963,0.00083536515,0.0003632269,0.000120619145],"category_scores_gemma":[0.000010451706,0.00033454757,0.00063479325,0.0000818053,0.00027619163,0.00019221188,0.00010393035,0.0006046925,0.0000035252474],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001768782,0.000010430813,0.00015628547,0.00006875397,0.00040753637,2.0045208e-7,0.0005162297,0.4370373,0.0000025538252,0.00053323916,0.5201947,0.041055102],"study_design_scores_gemma":[0.00040151592,0.000017553624,0.00042060495,0.00016500168,0.00005520285,0.0000042468514,0.000029276449,0.53347623,0.000005089126,0.0015100501,0.46368584,0.00022939478],"about_ca_topic_score_codex":0.016208133,"about_ca_topic_score_gemma":0.36319676,"teacher_disagreement_score":0.5878386,"about_ca_system_score_codex":0.0011993541,"about_ca_system_score_gemma":0.0010007429,"threshold_uncertainty_score":0.99991065},"labels":[],"label_agreement":null},{"id":"W582319133","doi":"","title":"Precast Concrete Bridges Roundtable","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Bridge (graph theory); Engineering; Civil engineering; Construction engineering; Forensic engineering","score_opus":0.014831364535361543,"score_gpt":0.24816900026776909,"score_spread":0.23333763573240754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W582319133","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89155173,0.001218721,0.006775612,0.014261668,0.0006533663,0.00029296716,0.0005932425,0.00045878263,0.0841939],"genre_scores_gemma":[0.9974514,0.00027141414,0.00039111666,0.00055694376,0.00047249225,0.000019306153,0.000042590997,0.000012376183,0.00078232755],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99900675,0.000025470727,0.00026411595,0.00016150164,0.00012056538,0.00042159148],"domain_scores_gemma":[0.99951714,0.000031636522,0.00003052802,0.00016630061,0.00007688428,0.00017753047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007657674,0.0001537743,0.00014377762,0.00019052524,0.00009790822,0.00030223592,0.00010645035,0.000107201435,0.000038474467],"category_scores_gemma":[0.00007660833,0.00017384431,0.000037667563,0.00033051887,0.00011198861,0.0007386382,0.000028682265,0.00011546552,0.000030107389],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012282754,0.0000061780797,0.014914932,0.000018178978,0.000022513455,7.021704e-7,0.00010716443,0.0007660392,0.000017010394,0.9553944,0.0029574323,0.025794216],"study_design_scores_gemma":[0.0015982107,0.000044740227,0.09364438,0.000046896334,0.000031437557,0.0002635543,0.0009973326,0.14051469,0.0004130306,0.01298518,0.7487235,0.0007370148],"about_ca_topic_score_codex":0.0042182123,"about_ca_topic_score_gemma":0.00073726824,"teacher_disagreement_score":0.9424092,"about_ca_system_score_codex":0.0007182371,"about_ca_system_score_gemma":0.00018554677,"threshold_uncertainty_score":0.7089165},"labels":[],"label_agreement":null},{"id":"W587439477","doi":"10.17226/22025","title":"Prefabricated Bridge Elements and Systems to Limit Traffic Disruption During Construction","year":2003,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Engineering; Transport engineering; Closure (psychology); Civil engineering; Construction engineering; Popularity; Forensic engineering","score_opus":0.035165591326671124,"score_gpt":0.2788615763343566,"score_spread":0.24369598500768547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W587439477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80498433,0.00076945795,0.0026671682,0.000057983587,0.0017728554,0.003952203,0.0004994065,0.0011910246,0.18410558],"genre_scores_gemma":[0.72036374,0.0003889212,0.000562129,0.00002011586,0.00036324532,0.00080351956,0.00068681454,0.00023233608,0.2765792],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99742764,0.00009640349,0.0007154758,0.00049943454,0.00077636685,0.00048468998],"domain_scores_gemma":[0.9989588,0.00004534802,0.00009051706,0.00028298236,0.00034668043,0.00027566374],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00031246687,0.00035864976,0.00036270355,0.00072530605,0.00024485934,0.00018576506,0.00013144901,0.00040953085,0.000066166496],"category_scores_gemma":[0.000009287488,0.00040290842,0.00008509941,0.00015829958,0.00016655891,0.00013444437,0.0000046368077,0.0007822931,0.0000762419],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014161216,0.00022915997,0.0056772185,0.021954266,0.003587833,0.00035052298,0.015134967,0.0686755,0.047750697,0.17773637,0.14261971,0.5148676],"study_design_scores_gemma":[0.00845186,0.0012342138,0.16996138,0.0057138065,0.0008974192,0.00017319845,0.0024561936,0.01741774,0.0061375163,0.0047366265,0.77656686,0.0062531787],"about_ca_topic_score_codex":0.000047032318,"about_ca_topic_score_gemma":0.00028320125,"teacher_disagreement_score":0.63394713,"about_ca_system_score_codex":0.00043850485,"about_ca_system_score_gemma":0.00015585843,"threshold_uncertainty_score":0.9998423},"labels":[],"label_agreement":null},{"id":"W595271297","doi":"10.33593/iccp.v10i1.445","title":"Quebec Contractor Experience with Unbonded Concrete Overlays","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Concrete Pavements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Overlay; Forensic engineering; Civil engineering; Engineering; Computer science","score_opus":0.01374724149265751,"score_gpt":0.23577759771181378,"score_spread":0.22203035621915626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W595271297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8759639,0.000016822376,0.00018921198,0.00047885728,0.0009154456,0.00024006626,0.000024806088,0.000088260625,0.12208259],"genre_scores_gemma":[0.99681264,0.000021066293,0.00018568334,0.00030369102,0.000038212664,0.000067687375,0.000004203285,0.000010669689,0.0025561333],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989702,0.0000034345508,0.00029221753,0.00019557159,0.00038909802,0.0001494593],"domain_scores_gemma":[0.9991966,0.000025617479,0.00013018165,0.00009886004,0.00051325187,0.00003551475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000705551,0.00017205752,0.00016210439,0.00009809693,0.00006299885,0.00011910899,0.0005178166,0.0000662983,0.00025404248],"category_scores_gemma":[0.000043404107,0.00012495756,0.00005716677,0.0001556336,0.00013663125,0.00025863902,0.00005085575,0.00017762776,0.0000074891927],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014242216,0.0000026888465,0.008921454,0.00004530016,0.00023121535,3.7899926e-7,0.0003944513,0.000016615671,0.37979123,0.60694,0.0014865439,0.0020277344],"study_design_scores_gemma":[0.002048898,0.000116296425,0.009915939,0.0010384114,0.000057303965,0.000007002088,0.0023676732,0.023696665,0.9481967,0.0026483657,0.00946863,0.00043811733],"about_ca_topic_score_codex":0.00017915957,"about_ca_topic_score_gemma":0.000038985956,"teacher_disagreement_score":0.6042916,"about_ca_system_score_codex":0.00013768335,"about_ca_system_score_gemma":0.000069793656,"threshold_uncertainty_score":0.50956213},"labels":[],"label_agreement":null},{"id":"W608176372","doi":"","title":"Innovative Process for the Development of New City of Calgary Road Construction Specifications - A Case Study","year":2012,"lang":"en","type":"article","venue":"2012 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: INNOVATIONS AND OPPORTUNITIES","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"CLARITY; Process (computing); Quality (philosophy); Accountability; Engineering; Process management; Sustainable development; Business; Engineering management; Transport engineering; Operations management; Computer science; Political science","score_opus":0.07473682660366157,"score_gpt":0.2515211903253766,"score_spread":0.17678436372171505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W608176372","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9703999,0.00012787526,0.027541924,0.00037790375,0.00025727352,0.00059966644,0.00048572707,0.000013978444,0.00019574295],"genre_scores_gemma":[0.9984913,0.00005109669,0.0009733048,0.000019731853,0.000025580219,0.00007572074,0.00021914553,0.000009536179,0.00013458575],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9983674,0.000026072308,0.0010476239,0.00009799447,0.00033472295,0.00012612942],"domain_scores_gemma":[0.99745697,0.00010698041,0.00076583686,0.000116663934,0.001506755,0.000046788635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035285504,0.00014060215,0.0002510127,0.00014152033,0.00021032165,0.000008914355,0.00006881665,0.0000795592,0.000060781193],"category_scores_gemma":[0.000021310443,0.000115624,0.000038379454,0.0004825457,0.00013262196,0.00046685323,0.0000013387837,0.000100501624,1.869332e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017035333,0.00042316716,0.42065322,0.0013843165,0.0011943772,0.00000119231,0.08982256,0.0010903314,0.0038648492,0.38215345,0.0011101833,0.09813201],"study_design_scores_gemma":[0.0013376229,0.000072348645,0.8860029,0.0001491413,0.00031834087,0.000008311651,0.09380788,0.00052607554,0.014642517,0.0010430734,0.001807918,0.00028389491],"about_ca_topic_score_codex":0.005734753,"about_ca_topic_score_gemma":0.106317565,"teacher_disagreement_score":0.46534964,"about_ca_system_score_codex":0.00004986795,"about_ca_system_score_gemma":0.0007837975,"threshold_uncertainty_score":0.90998983},"labels":[],"label_agreement":null},{"id":"W6087492","doi":"10.22260/isarc2013/0052","title":"Material Status Index in Support of EVM","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Float (project management); Index (typography); Computer science; Earned value management; Operations research; Project management; Engineering; Systems engineering; Project portfolio management; Operating system; World Wide Web","score_opus":0.004594481370357864,"score_gpt":0.17791917700016416,"score_spread":0.1733246956298063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6087492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9821991,0.000008699192,0.000008196365,0.00007267443,0.0003144861,0.000113755545,0.0000064225615,0.000028649842,0.017248036],"genre_scores_gemma":[0.9996242,0.0000093047765,0.00016806716,0.000013365626,0.00003449083,0.000016827582,6.802801e-7,0.000008536617,0.00012451164],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995428,0.000001023209,0.00019030117,0.00005353252,0.000101339545,0.000111046065],"domain_scores_gemma":[0.9998046,0.000003777449,0.000048810893,0.000039441245,0.000085003485,0.00001833568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000047874622,0.000058869897,0.000094208866,0.00005857196,0.000008937936,0.000013981814,0.00010763828,0.00004786662,0.00034076688],"category_scores_gemma":[0.000013965827,0.000044049662,0.000028135917,0.00012162834,0.000039457038,0.00017016994,0.000022965796,0.0000685471,0.00000835129],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036481542,0.00003975846,0.20141076,0.00043340004,0.000038749957,6.9882354e-8,0.001988021,0.00013213359,0.74795806,0.011235392,0.02017418,0.016552987],"study_design_scores_gemma":[0.00057711726,0.000055309785,0.18437274,0.00008631967,0.000014585519,0.000010663728,0.0014271946,0.0024184934,0.7943269,0.011298072,0.005202151,0.00021045646],"about_ca_topic_score_codex":0.00010984287,"about_ca_topic_score_gemma":0.000005751735,"teacher_disagreement_score":0.04636883,"about_ca_system_score_codex":0.000022787388,"about_ca_system_score_gemma":0.000008841037,"threshold_uncertainty_score":0.37311587},"labels":[],"label_agreement":null},{"id":"W609303175","doi":"","title":"Innovative Development Framework for the Long Term Roadway Network Planning in the Municipal District of Rocky View, Alberta","year":2009,"lang":"en","type":"article","venue":"2009 ANNUAL CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION IN A CLIMATE OF CHANGE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Plan (archaeology); Context (archaeology); Transportation planning; Transport engineering; Process (computing); Work (physics); Jurisdiction; Site plan; Urban planning; Sustainable development; Environmental planning; Network planning and design; Regional planning; Engineering; Computer science; Civil engineering; Geography; Political science; Telecommunications","score_opus":0.02178770084888899,"score_gpt":0.24458945435925974,"score_spread":0.22280175351037076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W609303175","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9938534,0.00025173594,0.0036976973,0.00076538004,0.00021326002,0.0006224758,0.0004540338,0.000007919636,0.00013412061],"genre_scores_gemma":[0.9991351,0.00017765258,0.00023438365,0.00008182902,0.000024333882,0.00007196543,0.00025981164,0.0000071758504,0.000007772324],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99839526,0.00004887557,0.00088585477,0.00011165621,0.0003736506,0.00018468793],"domain_scores_gemma":[0.99855196,0.00033601836,0.00060292165,0.00010784026,0.00038246016,0.000018781568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041087565,0.00013959815,0.00027665013,0.00008861412,0.000075166616,0.00000804225,0.00014923779,0.00011627479,0.00001639988],"category_scores_gemma":[0.00003696319,0.00010245063,0.00005503849,0.0005995215,0.00004094709,0.00019864194,9.0102543e-7,0.00016075528,3.3879427e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009888603,0.00025046067,0.63228077,0.0013253638,0.00026953648,0.000001934377,0.17429562,0.05731431,0.00071794173,0.09627783,0.0005524944,0.035724886],"study_design_scores_gemma":[0.00066364295,0.00005653615,0.9917272,0.00048620696,0.000040644478,1.2517162e-7,0.003949751,0.0006609744,0.001520114,0.0006460086,0.00014226118,0.000106579275],"about_ca_topic_score_codex":0.005503181,"about_ca_topic_score_gemma":0.35691562,"teacher_disagreement_score":0.3594464,"about_ca_system_score_codex":0.000070366776,"about_ca_system_score_gemma":0.0001251726,"threshold_uncertainty_score":0.83192},"labels":[],"label_agreement":null},{"id":"W611127012","doi":"","title":"Recent development in reinforced concrete slab analysis, design, and serviceability 2011 : held at the ACI fall 2011 convention : Toronto, Ontario, Canada, 21-25 October 2011","year":2011,"lang":"en","type":"book","venue":"American Concrete Institute eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Engineering; Reinforced concrete; Forensic engineering; Slab; Convention; Civil engineering; Structural engineering; Political science; Law","score_opus":0.013164994547003622,"score_gpt":0.1920291310832172,"score_spread":0.17886413653621358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W611127012","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12576918,0.005787928,0.0058719735,0.00021968562,0.005097055,0.0049164346,0.00030136257,0.000601952,0.8514344],"genre_scores_gemma":[0.06390171,0.0021326775,0.0036178313,0.0014251163,0.00032161357,0.00088981504,0.0018006781,0.00024002166,0.92567056],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99670017,0.00015741863,0.0012144347,0.00079645973,0.00050752837,0.00062396104],"domain_scores_gemma":[0.99785656,0.00011762188,0.00054904964,0.00088228565,0.00030891568,0.0002855874],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00048825546,0.00083012565,0.0011092637,0.0001904294,0.00027252443,0.00007125076,0.00046252544,0.0003899343,0.0036281445],"category_scores_gemma":[0.000011133541,0.00074516813,0.00019616517,0.00007938305,0.00068940903,0.00025791602,0.0001763685,0.0007825008,0.00009011576],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028169646,0.000010768628,0.011611069,0.001383075,0.025634974,0.0004331814,0.031663936,0.0036121318,0.0030597837,0.027821163,0.2526336,0.63931936],"study_design_scores_gemma":[0.00064633973,0.000092844035,0.0019431747,0.00010261861,0.0006824904,0.000028696426,0.00021330455,0.0012130718,0.0011392734,0.000036974536,0.99279094,0.0011102759],"about_ca_topic_score_codex":0.91008854,"about_ca_topic_score_gemma":0.994244,"teacher_disagreement_score":0.74015737,"about_ca_system_score_codex":0.0053723846,"about_ca_system_score_gemma":0.0035453287,"threshold_uncertainty_score":0.9994999},"labels":[],"label_agreement":null},{"id":"W615664348","doi":"","title":"VANCOUVER LINE ROLLS ON DESPITE BUMPY START : MURKY FUTURE OF DESIGN- BUILD CONTRACT SPAT LOOMS AS VANCOUVER LINE NEARS SWIFT FINISH","year":2001,"lang":"en","type":"article","venue":"ENR","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Swift; Finish line; Track (disk drive); Engineering; Line (geometry); Architectural engineering; Civil engineering; Computer science; Geology; Mechanical engineering","score_opus":0.00847431555273453,"score_gpt":0.21133948578323206,"score_spread":0.20286517023049752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W615664348","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84866893,0.001551994,0.117732726,0.0003049408,0.015288274,0.0009214278,0.0000886906,0.00082624424,0.014616761],"genre_scores_gemma":[0.9927035,0.00029229047,0.0027512105,0.00031809942,0.0012515276,0.000022023001,0.00001491612,0.000055639463,0.002590789],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987848,0.000038552098,0.0003871515,0.00023300301,0.00027078317,0.0002857064],"domain_scores_gemma":[0.9992787,0.000094439274,0.00009008652,0.0003114824,0.00011685929,0.00010838401],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00014457037,0.00026418632,0.0003043505,0.00011882147,0.000060879673,0.000030488483,0.00013825802,0.00023317599,0.0012421885],"category_scores_gemma":[0.000035732337,0.00023508175,0.0001232443,0.00024375076,0.00004320115,0.00020855918,0.000012693112,0.0003581512,0.00010475085],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00097549765,0.0004042273,0.0035244445,0.000121551624,0.0004324672,0.00013753463,0.0011665251,0.3264127,0.01973062,0.0012813035,0.21360749,0.43220565],"study_design_scores_gemma":[0.0041040345,0.0012755325,0.0026048846,0.00030473314,0.0001550674,0.000040534793,0.00075478165,0.0628327,0.12335903,0.0018455464,0.80158633,0.0011368365],"about_ca_topic_score_codex":0.00009016932,"about_ca_topic_score_gemma":0.0014675696,"teacher_disagreement_score":0.58797884,"about_ca_system_score_codex":0.0000705495,"about_ca_system_score_gemma":0.000043411543,"threshold_uncertainty_score":0.9996708},"labels":[],"label_agreement":null},{"id":"W625422154","doi":"","title":"Show Me the Savings","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"SAFER; Bridge (graph theory); Schedule; Quality (philosophy); Business; Marketing; Engineering; Risk analysis (engineering); Computer science; Computer security","score_opus":0.010467061632640173,"score_gpt":0.23523055182525843,"score_spread":0.22476349019261826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W625422154","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80297214,0.0008558207,0.0038426511,0.065012954,0.00062682346,0.00028704034,0.0002757556,0.00037622228,0.12575057],"genre_scores_gemma":[0.9979635,0.00014828032,0.00018031914,0.0011134174,0.0003766383,0.000013581853,0.000012369291,0.0000067299875,0.00018519393],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99934286,0.000019270688,0.00017096124,0.000095725656,0.00009508657,0.0002760961],"domain_scores_gemma":[0.9996683,0.000031255528,0.00001879206,0.00014341928,0.000045727007,0.000092482136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007317827,0.00009939536,0.00007808747,0.000105979954,0.0001038235,0.00013860394,0.0001106532,0.00006551801,0.000033641612],"category_scores_gemma":[0.00007030128,0.000085510925,0.000029491921,0.0002932019,0.00013636806,0.00022369472,0.00002351855,0.000101238926,0.000023204524],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.1827346e-7,0.0000066826183,0.008203848,0.0000048865204,0.000011031028,1.7436255e-7,0.00014193976,0.00023191537,0.000007800278,0.9614929,0.0029601362,0.026938396],"study_design_scores_gemma":[0.0008176828,0.000020509004,0.19550079,0.000022161788,0.00002472224,0.00016132492,0.0016885152,0.144734,0.00013269162,0.03734832,0.6190996,0.00044969033],"about_ca_topic_score_codex":0.0012758083,"about_ca_topic_score_gemma":0.0005405317,"teacher_disagreement_score":0.92414457,"about_ca_system_score_codex":0.00027596604,"about_ca_system_score_gemma":0.000108993925,"threshold_uncertainty_score":0.34870344},"labels":[],"label_agreement":null},{"id":"W632573533","doi":"","title":"Giving the city back to the people","year":2006,"lang":"en","type":"article","venue":"TRA - TRANSPORT RESEARCH ARENA EUROPE 2006: GOETEBORG, SWEDEN, JUNE 12TH-15TH 2006: GREENER, SAFER AND SMARTER ROAD TRANSPORT FOR EUROPE. PROCEEDINGS","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Port (circuit theory); Plan (archaeology); Quarter (Canadian coin); Engineering; Civil engineering; Business; Transport engineering; Archaeology; History","score_opus":0.02521516321126708,"score_gpt":0.2526985235952277,"score_spread":0.22748336038396064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W632573533","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9071254,0.0020642572,0.014486753,0.008035517,0.0018230644,0.0051762923,0.0014159674,0.0011477596,0.05872496],"genre_scores_gemma":[0.9758606,0.00072878686,0.00050088105,0.00031301074,0.0010733695,0.00045552792,0.00035519814,0.00032878708,0.020383824],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9936747,0.00009321972,0.0014471014,0.0013097813,0.0014896494,0.001985554],"domain_scores_gemma":[0.99718344,0.00010102909,0.00013703352,0.0006996106,0.0013340112,0.0005448513],"candidate_categories":["metaepi_narrow","sts"],"consensus_categories":[],"category_scores_codex":[0.0019824833,0.0010000682,0.00080571685,0.0005452643,0.0013737483,0.0003928365,0.0013372946,0.00027966299,0.00045835934],"category_scores_gemma":[0.0000312013,0.0006954699,0.00038237564,0.0025717113,0.00054001843,0.0008525755,0.00004988488,0.001536375,0.0002142164],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003189464,0.0012695565,0.49564204,0.0038952015,0.001338696,0.000263836,0.015750369,0.00564364,0.024007216,0.022837177,0.35389748,0.0722653],"study_design_scores_gemma":[0.0014953736,0.00030709492,0.3672276,0.00017387331,0.00018396782,0.00010907385,0.00034050495,0.0014208253,0.002014455,0.00015333353,0.62557137,0.0010025046],"about_ca_topic_score_codex":0.0013183915,"about_ca_topic_score_gemma":0.010023695,"teacher_disagreement_score":0.2716739,"about_ca_system_score_codex":0.00009387217,"about_ca_system_score_gemma":0.00015051955,"threshold_uncertainty_score":0.9999263},"labels":[],"label_agreement":null},{"id":"W634865309","doi":"","title":"Compare Risk Allocation for Different Project Delivery Methods in Canada","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Timeline; Schedule; Business; Operations management; Risk analysis (engineering); Risk management; Project management; Transport engineering; Operations research; Engineering; Computer science; Finance","score_opus":0.03977327222374225,"score_gpt":0.2617257308271278,"score_spread":0.22195245860338556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W634865309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44347733,0.00007645098,0.54691195,0.000007334024,0.00054217235,0.00028898165,0.000012305431,0.000083113155,0.00860038],"genre_scores_gemma":[0.962638,0.000018118693,0.037193242,0.000010791932,0.000013232516,0.00007412514,0.0000083407,0.0000058260307,0.0000383224],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997049,0.000019849174,0.00011286796,0.00005825179,0.00003135205,0.00007276138],"domain_scores_gemma":[0.9998639,0.000026601627,0.0000128693255,0.000057767196,0.000024869149,0.000013941139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000040898543,0.00005386587,0.000065051376,0.00003865979,0.00001516536,0.0000041598532,0.00003350642,0.000016217196,0.00008909438],"category_scores_gemma":[0.0000056704894,0.000044540182,0.000014617155,0.00004858858,0.0000037151935,0.000040108996,0.000002717289,0.000046525765,6.9078897e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034520373,0.000024201012,0.07733963,0.000085869455,0.00006643867,4.5584142e-7,0.0010079119,0.0018117399,0.0015365357,0.009144219,0.0060013016,0.9029472],"study_design_scores_gemma":[0.0005920794,0.000029402418,0.23195711,0.000018681521,0.000030168028,0.0000034757131,0.002753768,0.6841479,0.074098654,0.0013132764,0.004734606,0.0003208527],"about_ca_topic_score_codex":0.7428652,"about_ca_topic_score_gemma":0.96591353,"teacher_disagreement_score":0.90262634,"about_ca_system_score_codex":0.00016717799,"about_ca_system_score_gemma":0.000066797664,"threshold_uncertainty_score":0.2588471},"labels":[],"label_agreement":null},{"id":"W63721855","doi":"10.22260/isarc2013/0162","title":"The Autonomous Real-Time System for Ubiquitous Construction Resource Tracking","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Tracking system; Resource (disambiguation); Automation; Global Positioning System; Geolocation; Truck; Process (computing); Database; Systems engineering; Operating system; Engineering; Automotive engineering; Computer network","score_opus":0.0061374552570229194,"score_gpt":0.18277360198357048,"score_spread":0.17663614672654757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W63721855","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9107349,0.00015629335,0.0004115187,0.00072535034,0.0012621417,0.0011774059,0.000010873101,0.00069787167,0.08482366],"genre_scores_gemma":[0.99792993,0.000013268371,0.0010128847,0.000008002424,0.00022710743,0.000147414,8.575676e-7,0.000027842474,0.0006327168],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99926233,0.0000041042204,0.0002843207,0.00011866103,0.00013754642,0.00019305461],"domain_scores_gemma":[0.9994369,0.00006443519,0.00012771039,0.00009924103,0.00023994164,0.000031738968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018145292,0.0001184773,0.0001306816,0.00003871568,0.0002655961,0.00013174562,0.00025366538,0.00008360693,0.00001132751],"category_scores_gemma":[0.00004113745,0.00007477856,0.00009751034,0.00013236387,0.00011616853,0.00020093968,0.000024470712,0.000114040995,0.000016785745],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004671915,0.00001407553,0.0008114342,0.00074061536,0.00015970883,5.666563e-8,0.001394607,0.00043744888,0.62235993,0.13696076,0.028422112,0.20865251],"study_design_scores_gemma":[0.0011930453,0.00015189627,0.0026516076,0.00070040167,0.00021065665,0.0003805234,0.019374996,0.11803812,0.78468245,0.013732237,0.05811815,0.00076593616],"about_ca_topic_score_codex":0.000027420396,"about_ca_topic_score_gemma":0.0000012911443,"teacher_disagreement_score":0.20788658,"about_ca_system_score_codex":0.00010260711,"about_ca_system_score_gemma":0.00001269887,"threshold_uncertainty_score":0.3049381},"labels":[],"label_agreement":null},{"id":"W641156406","doi":"","title":"Sustainable construction modelling: a systems engineering approach","year":2013,"lang":"en","type":"article","venue":"RMIT Research Repository (RMIT University Library)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Systems engineering; Process (computing); Computer science; Information system; Information model; Building information modeling; Resource (disambiguation); Product (mathematics); Construction management; Sustainability; Engineering; Civil engineering; Software engineering","score_opus":0.013962207147368257,"score_gpt":0.17466089704633198,"score_spread":0.16069868989896371,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W641156406","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49124703,0.0008453273,0.10039847,0.0001180467,0.0009716173,0.0013287734,0.0000065515087,0.0021731595,0.402911],"genre_scores_gemma":[0.94205236,0.00008170132,0.00400121,0.0000019912354,0.00024325745,0.000019690979,0.0000173733,0.00004558031,0.053536844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99842966,0.00012368054,0.00019737624,0.00030291386,0.00039008394,0.00055630156],"domain_scores_gemma":[0.999096,0.00006644946,0.000030021243,0.00033277876,0.00023663741,0.00023814818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012264971,0.00017950218,0.00018012688,0.00059401296,0.00040493417,0.00042921453,0.0003189629,0.0002099159,0.000059215658],"category_scores_gemma":[0.000008209367,0.0002014591,0.00008006874,0.00077553885,0.0001371162,0.0024690512,0.00009363507,0.0006068289,0.00006341195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040462444,0.00007550787,0.0025965676,0.00093315856,0.00022051382,0.00016618085,0.00057093956,0.5263869,0.0038595123,0.4231745,0.04060791,0.0013678338],"study_design_scores_gemma":[0.00029753047,0.000039154365,0.0001944661,0.000049029502,0.000013160396,0.00010288717,0.0063294517,0.91365445,0.0033537357,0.00022132452,0.07544158,0.00030321095],"about_ca_topic_score_codex":0.0007022129,"about_ca_topic_score_gemma":4.5250766e-7,"teacher_disagreement_score":0.45080534,"about_ca_system_score_codex":0.00026961893,"about_ca_system_score_gemma":0.00011710609,"threshold_uncertainty_score":0.82152635},"labels":[],"label_agreement":null},{"id":"W649371671","doi":"10.4018/979-8-3373-0700-8","title":"Project Management Information Systems","year":2025,"lang":"en","type":"book","venue":"IGI Global eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Information system; Engineering management; Project management; Project management triangle; Process (computing); Management information systems; Software project management; Process management; Extreme project management; Computer science; Engineering; Knowledge management; Systems engineering; Software; OPM3; Software system","score_opus":0.006299466604962729,"score_gpt":0.20408125251128786,"score_spread":0.19778178590632514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W649371671","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0000025362035,0.0003333631,0.0049641007,0.0000019816428,0.0027521844,0.0005678004,0.00013116213,0.0005506359,0.99069625],"genre_scores_gemma":[0.010092649,0.0000328396,0.00043614247,0.000118566604,0.00039118144,0.00034138418,0.00013050529,0.00002614517,0.98843056],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99926174,0.0000072963885,0.00030469912,0.00009974409,0.00018677156,0.0001397541],"domain_scores_gemma":[0.999649,0.0000040100504,0.000054915457,0.00020831116,0.000058953712,0.000024815401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000034305733,0.00020982392,0.00017844402,0.00013049557,0.000037495116,0.00013841687,0.0001255091,0.0002546702,0.0000039546944],"category_scores_gemma":[0.0000013067324,0.00021259312,0.000073703246,0.00003966945,0.000015632417,0.00009703433,0.000026159534,0.00015047479,0.00014524604],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000025745128,5.2467186e-7,6.550913e-7,0.00050737994,0.00008920277,0.0000015700655,0.000015492797,0.00024621244,1.4299906e-7,0.7754925,0.19863892,0.025004823],"study_design_scores_gemma":[0.00016018403,0.000009597263,0.0000046278983,0.0004449708,0.00007142591,0.000015797072,0.0000599021,0.0014969549,0.000004577196,0.012261723,0.98524255,0.00022770332],"about_ca_topic_score_codex":0.00002394674,"about_ca_topic_score_gemma":0.0000092573155,"teacher_disagreement_score":0.7866036,"about_ca_system_score_codex":0.0005964345,"about_ca_system_score_gemma":0.00012485478,"threshold_uncertainty_score":0.8669296},"labels":[],"label_agreement":null},{"id":"W650483224","doi":"","title":"Planning of an Unconventional Urban Arterial Intersection - A Context Sensitive Approach","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Intersection (aeronautics); TRIPS architecture; Context (archaeology); Expansive; Constraint (computer-aided design); Population; Computer science; Geography; Engineering; Medicine","score_opus":0.011256930873730236,"score_gpt":0.21716547478888307,"score_spread":0.20590854391515284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W650483224","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6174317,0.0000059876343,0.35245037,0.0000014600068,0.0005765434,0.000042598826,0.0000027188837,0.00009218587,0.029396452],"genre_scores_gemma":[0.997911,1.5025799e-7,0.0017520932,0.0000117585005,0.0001960289,0.0000021580393,0.00003166506,0.0000066126,0.000088549736],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999617,0.000009194662,0.00015714292,0.00007237955,0.00006911389,0.00007520324],"domain_scores_gemma":[0.9998434,0.000010532867,0.000022337723,0.00004854307,0.00004556997,0.000029616851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009908795,0.000059427628,0.000069934045,0.00007968527,0.000020676714,0.0000103695675,0.000020826576,0.000053656833,0.000070810136],"category_scores_gemma":[0.000002885425,0.000057555168,0.000032228014,0.00006441478,0.000028481545,0.00014300611,0.0000028594156,0.00006478169,0.000004155113],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010673769,0.0003072644,0.0047474513,0.00017388772,0.0005038808,0.00001728072,0.015004803,0.011783766,0.43165776,0.26455194,0.004503425,0.26568115],"study_design_scores_gemma":[0.0032331534,0.00044511745,0.040521707,0.00012985285,0.00006862622,0.00047009377,0.057058614,0.38958046,0.50213397,0.0017425513,0.003806325,0.0008095154],"about_ca_topic_score_codex":0.000026461315,"about_ca_topic_score_gemma":0.00003225864,"teacher_disagreement_score":0.3804793,"about_ca_system_score_codex":0.00003278496,"about_ca_system_score_gemma":0.000006043686,"threshold_uncertainty_score":0.23470317},"labels":[],"label_agreement":null},{"id":"W657900759","doi":"","title":"The economics, performance, and sustainability of internally cured concrete : held at the ACI fall 2011 convention : Toronto, Ontario, Canada, 21-25 October 2011","year":2011,"lang":"en","type":"book","venue":"American Concrete Institute eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Convention; Sustainability; Engineering; Economic history; Agricultural economics; Environmental science; Political science; History; Economics; Law; Ecology; Biology","score_opus":0.005629670904393101,"score_gpt":0.1749865234501705,"score_spread":0.1693568525457774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W657900759","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20010337,0.0017008266,0.00016561156,0.00010836985,0.0037520246,0.0011477484,0.00019650848,0.00011763719,0.7927079],"genre_scores_gemma":[0.32735416,0.00083064014,0.00005054381,0.00018302714,0.00025866664,0.00013211556,0.00010590873,0.00007998097,0.67100495],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99810433,0.000058745045,0.0007998338,0.000414776,0.00020721767,0.0004150904],"domain_scores_gemma":[0.9981358,0.000106585554,0.0005671164,0.0007181785,0.00032441618,0.00014790767],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00026759558,0.00051371113,0.0006304423,0.000047868256,0.0003288892,0.00006141823,0.0004908463,0.00021153566,0.00045877177],"category_scores_gemma":[0.000013816023,0.00038771707,0.00018484004,0.0000138213045,0.002081089,0.00021534949,0.00016669897,0.0005966372,0.0000132275645],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016316478,0.0000045476354,0.0111218225,0.0012619379,0.0053695533,0.00004378537,0.008594509,0.00024665735,0.00031008234,0.14566696,0.37278017,0.45296833],"study_design_scores_gemma":[0.0003612877,0.00016518409,0.0009184068,0.00008059071,0.00016294552,0.00004291692,0.00035439752,0.0004446197,0.00029785623,0.00022528603,0.99646145,0.0004850556],"about_ca_topic_score_codex":0.8700707,"about_ca_topic_score_gemma":0.9849921,"teacher_disagreement_score":0.62368125,"about_ca_system_score_codex":0.0029923331,"about_ca_system_score_gemma":0.002843803,"threshold_uncertainty_score":0.9998575},"labels":[],"label_agreement":null},{"id":"W6886025474","doi":"10.14288/1.0442066","title":"Owner-driven implementation of BIM : process, challenges, information quality, and value","year":2024,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Asset (computer security); Interoperability; Asset management; Process (computing); Quality (philosophy); Work (physics); Grounded theory; IT asset management","score_opus":0.012007736293944356,"score_gpt":0.2148160137759703,"score_spread":0.20280827748202593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6886025474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99425423,0.0006060328,0.003227839,0.000095785625,0.00015221059,0.0001144059,0.00012040941,0.00012467755,0.0013043962],"genre_scores_gemma":[0.99882513,0.0008948294,0.00021631384,0.000003663195,0.000012518054,5.747953e-7,0.0000286527,0.000004334037,0.000013998027],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99961174,0.000012758177,0.000119355434,0.000078942336,0.0001122552,0.00006497556],"domain_scores_gemma":[0.9997854,0.000011020458,0.000037520385,0.00005809158,0.000080973456,0.000026943506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007596877,0.000023629369,0.00009354555,0.0000533057,0.000038690316,0.000047606864,0.000052298044,0.000053659147,0.000048153488],"category_scores_gemma":[0.0000027255014,0.00006538209,0.000030448819,0.0001262015,0.000056748264,0.0007154864,0.000014434795,0.00005681878,0.000004057175],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000011557709,0.0000039847396,0.001219238,0.0006493888,0.00003071011,0.0000012547177,0.00096730684,0.00006504785,0.00014880659,0.00031801825,0.0002302902,0.9963648],"study_design_scores_gemma":[0.00031747215,0.000039335715,0.9801499,0.0001709333,0.000028822882,0.000023898601,0.010632441,0.0058622193,0.000015774029,0.0016003429,0.0010479795,0.000110868124],"about_ca_topic_score_codex":0.010034941,"about_ca_topic_score_gemma":0.043955915,"teacher_disagreement_score":0.9962539,"about_ca_system_score_codex":0.000027640523,"about_ca_system_score_gemma":0.000029215253,"threshold_uncertainty_score":0.9965573},"labels":[],"label_agreement":null},{"id":"W6898754662","doi":"10.57922/tcrc.614","title":"Reality Data Capture for Reclaimed Construction Materials","year":2022,"lang":"en","type":"article","venue":"UNB Conferences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demolition; Reuse; Procurement; Process (computing); Quality (philosophy); Plan (archaeology); 3d scanning; Engineering design process","score_opus":0.05910249487272034,"score_gpt":0.2627918519934376,"score_spread":0.20368935712071723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6898754662","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6477914,0.0014214321,0.18486257,0.004631347,0.037643798,0.0029317325,0.018191675,0.0030369668,0.09948907],"genre_scores_gemma":[0.99714357,0.000018192999,0.001396873,0.000030588184,0.00012857001,0.00010220715,0.0010118482,0.000008005226,0.0001601741],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994203,0.000039818184,0.00017271817,0.00016176347,0.00010149577,0.00010392234],"domain_scores_gemma":[0.99961585,0.00003178158,0.00003917831,0.00024782532,0.000041707306,0.000023653098],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00017994753,0.00007879268,0.000109637156,0.000043367905,0.00016460319,0.000054168086,0.0002119543,0.00004134984,0.0014177992],"category_scores_gemma":[0.000019367108,0.00007620572,0.000015613754,0.000074641284,0.00004562183,0.00012878152,0.000043455384,0.00008366201,0.000004288703],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015539503,0.000038224483,0.0013678267,0.00021318464,0.00022136616,0.0000023564614,0.0009037579,0.0017320962,0.045372132,0.60440785,0.090514496,0.25507128],"study_design_scores_gemma":[0.00091337744,0.00008873066,0.0006571172,0.000024593277,0.00009335927,0.00011614109,0.006946976,0.033073552,0.036461048,0.038761176,0.882251,0.00061289663],"about_ca_topic_score_codex":0.00014122002,"about_ca_topic_score_gemma":0.00009275339,"teacher_disagreement_score":0.79173654,"about_ca_system_score_codex":0.000028745004,"about_ca_system_score_gemma":0.00006208823,"threshold_uncertainty_score":0.999495},"labels":[],"label_agreement":null},{"id":"W6902024741","doi":"10.6084/m9.figshare.21625526.v1","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"EEA Grants/Norway Grants","keywords":"Software deployment; Bridge (graph theory); Process (computing); Productivity; Construction industry; Adaptation (eye)","score_opus":0.048838544874795366,"score_gpt":0.251655454222142,"score_spread":0.20281690934734667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6902024741","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66966796,0.0008765545,0.01629292,0.0015117389,0.0051067257,0.0060089235,0.29061386,0.0008550807,0.009066217],"genre_scores_gemma":[0.99448556,4.1427012e-7,0.0003520615,0.000008798709,0.00009458598,0.0005842668,0.004462129,0.00000589013,0.0000062899912],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959743,0.000025479529,0.00013905039,0.00007796956,0.000091950904,0.00006811816],"domain_scores_gemma":[0.9997939,0.000037066253,0.0000346653,0.00009044286,0.000036713693,0.000007237831],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007760872,0.000048106274,0.00005236354,0.000057833495,0.000060562896,0.000011462608,0.00008304786,0.000051557054,0.007072491],"category_scores_gemma":[0.000084223495,0.00004452934,0.000026646947,0.00023013819,0.000007374047,0.000081819744,0.000012322348,0.0002576814,0.000008636351],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006166428,0.00009315565,0.00023860898,0.00033777909,0.000021886619,0.0000013604131,0.0014137342,0.24911992,0.0022799454,0.014322166,0.03223365,0.6998761],"study_design_scores_gemma":[0.0005899896,0.00070362166,0.011111965,0.00085274724,0.000060269234,0.00042692182,0.037537966,0.57514364,0.122194566,0.034948174,0.21504334,0.0013867895],"about_ca_topic_score_codex":0.0000019378192,"about_ca_topic_score_gemma":0.000007811316,"teacher_disagreement_score":0.69848937,"about_ca_system_score_codex":0.000039272185,"about_ca_system_score_gemma":0.000020063486,"threshold_uncertainty_score":0.99383515},"labels":[],"label_agreement":null},{"id":"W6903141930","doi":"10.7939/r3-zzk7-t711","title":"Decarbonization of Concrete Structures: A Path Towards Industrialization","year":2024,"lang":"en","type":"dissertation","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Formwork; Greenhouse gas; Carbon footprint; Harm; Industrialisation; Sustainable development; Construction industry; Global warming","score_opus":0.005357310055761324,"score_gpt":0.16974421414866017,"score_spread":0.16438690409289886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6903141930","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82011133,0.0011573287,0.0007233592,0.000049153878,0.0027822177,0.00035574462,0.00008260266,0.000280099,0.17445816],"genre_scores_gemma":[0.9787627,0.0006156421,0.00068390585,0.000006547725,0.00012377407,4.448989e-7,0.0049406406,0.00006629052,0.014800043],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938345,0.000022607708,0.0002146685,0.00015223553,0.00014676989,0.000080297315],"domain_scores_gemma":[0.99961257,0.000027601658,0.00012619639,0.0001396942,0.000055824094,0.000038142905],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00001625381,0.00016178806,0.00024519258,0.00028301202,0.000027380533,0.000019496183,0.00015357332,0.00043266045,0.0007106515],"category_scores_gemma":[0.000011810759,0.00019142439,0.00010434713,0.0003552594,0.000037273283,0.0003634888,0.000015062938,0.00019472325,0.000006579286],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015633141,0.00004585025,0.0034231392,0.013070937,0.0036217503,0.000047323905,0.13146347,0.009296678,0.015177695,0.5028362,0.1426901,0.17676352],"study_design_scores_gemma":[0.0074784574,0.0009283281,0.01697497,0.011058489,0.0050126873,0.000046956593,0.07793724,0.1655632,0.3202443,0.032720275,0.35628968,0.0057454053],"about_ca_topic_score_codex":0.00041262503,"about_ca_topic_score_gemma":0.00014419893,"teacher_disagreement_score":0.47011593,"about_ca_system_score_codex":0.000024662004,"about_ca_system_score_gemma":0.00018023193,"threshold_uncertainty_score":0.78060603},"labels":[],"label_agreement":null},{"id":"W6921079750","doi":"10.6084/m9.figshare.21641672.v1","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construct (python library); Process (computing); Productivity; Work (physics); Plan (archaeology); Visibility; Construction industry","score_opus":0.048838544874795366,"score_gpt":0.251655454222142,"score_spread":0.20281690934734667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6921079750","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66966796,0.0008765545,0.01629292,0.0015117389,0.0051067257,0.0060089235,0.29061386,0.0008550807,0.009066217],"genre_scores_gemma":[0.99448556,4.1427012e-7,0.0003520615,0.000008798709,0.00009458598,0.0005842668,0.004462129,0.00000589013,0.0000062899912],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959743,0.000025479529,0.00013905039,0.00007796956,0.000091950904,0.00006811816],"domain_scores_gemma":[0.9997939,0.000037066253,0.0000346653,0.00009044286,0.000036713693,0.000007237831],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007760872,0.000048106274,0.00005236354,0.000057833495,0.000060562896,0.000011462608,0.00008304786,0.000051557054,0.007072491],"category_scores_gemma":[0.000084223495,0.00004452934,0.000026646947,0.00023013819,0.000007374047,0.000081819744,0.000012322348,0.0002576814,0.000008636351],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006166428,0.00009315565,0.00023860898,0.00033777909,0.000021886619,0.0000013604131,0.0014137342,0.24911992,0.0022799454,0.014322166,0.03223365,0.6998761],"study_design_scores_gemma":[0.0005899896,0.00070362166,0.011111965,0.00085274724,0.000060269234,0.00042692182,0.037537966,0.57514364,0.122194566,0.034948174,0.21504334,0.0013867895],"about_ca_topic_score_codex":0.0000019378192,"about_ca_topic_score_gemma":0.000007811316,"teacher_disagreement_score":0.69848937,"about_ca_system_score_codex":0.000039272185,"about_ca_system_score_gemma":0.000020063486,"threshold_uncertainty_score":0.99383515},"labels":[],"label_agreement":null},{"id":"W6923603382","doi":"10.14288/1.0434148","title":"Understanding the changes resulting from the virtualization of BIM-enabled collaborative design processes in the building construction industry","year":2023,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Context (archaeology); Maintainability; Virtualization; Usability; Collaborative design; Industry 4.0; Key (lock); Design technology","score_opus":0.03475471031923858,"score_gpt":0.19460498224724856,"score_spread":0.15985027192801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6923603382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95993793,0.00012081674,0.038635857,0.00033431133,0.00017454497,0.00031272098,0.00008894867,0.00008583611,0.00030904132],"genre_scores_gemma":[0.99941456,0.00021948264,0.00028013403,0.000014969445,0.00003444404,0.0000024875171,0.000014072027,0.000007448288,0.000012382459],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99933755,0.00013940416,0.000112222355,0.00012310207,0.00017614383,0.000111588466],"domain_scores_gemma":[0.9992424,0.0003835304,0.00010308502,0.00011983217,0.00013823343,0.000012868425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037156313,0.000037180253,0.000107410095,0.000049783055,0.00030255737,0.00009317886,0.00020779703,0.00011758716,0.000013821957],"category_scores_gemma":[0.0001147657,0.00006267953,0.00002041133,0.0015962701,0.00022542472,0.00021103752,0.000024351055,0.00020109778,9.049702e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015840714,0.00011602542,0.09046963,0.00076298084,0.00065883785,0.00008134985,0.08616376,0.15128991,0.017763074,0.0035962232,0.018504947,0.6304349],"study_design_scores_gemma":[0.0010198324,0.000055475615,0.49930885,0.0007568362,0.00008011332,0.000027301601,0.45653075,0.03480767,0.00019962288,0.0067958375,0.00018280184,0.00023491068],"about_ca_topic_score_codex":0.0061950916,"about_ca_topic_score_gemma":0.0803177,"teacher_disagreement_score":0.63019997,"about_ca_system_score_codex":0.00007389036,"about_ca_system_score_gemma":0.00006700882,"threshold_uncertainty_score":0.9365167},"labels":[],"label_agreement":null},{"id":"W6939357031","doi":"10.6084/m9.figshare.21625526","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"preprint","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"EEA Grants/Norway Grants","keywords":"Software deployment; Bridge (graph theory); Process (computing); Productivity; Construction industry; Adaptation (eye)","score_opus":0.06706578715417609,"score_gpt":0.27618025935354623,"score_spread":0.20911447219937013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6939357031","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17440614,0.0017562298,0.018821258,0.00097567186,0.011294188,0.010299687,0.7711827,0.0010887772,0.010175351],"genre_scores_gemma":[0.9442887,0.0000068626255,0.0014954265,0.00001055799,0.0004491977,0.002475012,0.051233646,0.000025865551,0.000014775835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920464,0.00004463391,0.00029852838,0.00019660893,0.00014893885,0.0001066731],"domain_scores_gemma":[0.9994753,0.00006497143,0.000111372436,0.00024919902,0.00008643888,0.00001272147],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00012138971,0.00013231278,0.00014417878,0.00011950686,0.000046550904,0.000036041627,0.0002046759,0.0003226618,0.011545112],"category_scores_gemma":[0.00020200078,0.00012434878,0.00007795355,0.00019371323,0.000014125057,0.00007599029,0.00006820228,0.0010246488,0.0000117084555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005208416,0.0000844749,0.0001308892,0.0023432393,0.000058589605,0.0000018399115,0.0012550553,0.52609587,0.0002837384,0.0057512503,0.023229182,0.4407138],"study_design_scores_gemma":[0.000520677,0.00045862002,0.010546077,0.008307911,0.00022836441,0.0002138685,0.022490086,0.640245,0.055399973,0.10490972,0.15337788,0.003301786],"about_ca_topic_score_codex":0.0000059296844,"about_ca_topic_score_gemma":0.000019866415,"teacher_disagreement_score":0.7698825,"about_ca_system_score_codex":0.00008983297,"about_ca_system_score_gemma":0.000071140676,"threshold_uncertainty_score":0.9893585},"labels":[],"label_agreement":null},{"id":"W6957856549","doi":"10.6084/m9.figshare.21641672","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"dissertation","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construct (python library); Process (computing); Productivity; Work (physics); Plan (archaeology); Visibility; Construction industry","score_opus":0.03973368122048685,"score_gpt":0.27491912172569494,"score_spread":0.2351854405052081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6957856549","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30480903,0.0036384016,0.0017715694,0.0003308398,0.01804866,0.012665701,0.6206908,0.0011884195,0.036856525],"genre_scores_gemma":[0.6315401,0.000010939031,0.0005104056,0.000008873978,0.00047980054,0.0029206285,0.36429334,0.000049924904,0.00018594273],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992263,0.00003183465,0.0003033267,0.0001646659,0.00016725446,0.00010664906],"domain_scores_gemma":[0.9995379,0.00006285332,0.00012426234,0.0001583446,0.000104886225,0.00001178512],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000084621104,0.00013652709,0.0001427678,0.00014931767,0.00006211989,0.000027645958,0.00014981502,0.00032518973,0.015581242],"category_scores_gemma":[0.00019445966,0.0001291331,0.00007185156,0.0003063179,0.000006774383,0.00011317588,0.000005893758,0.00065694674,0.000016692662],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016257276,0.00009911497,0.00003351438,0.00294428,0.0000688287,0.0000020531077,0.0031362625,0.032469362,0.0010500351,0.0072446424,0.034998655,0.91779065],"study_design_scores_gemma":[0.001008436,0.0011678273,0.017870935,0.013053098,0.0005214015,0.0002861716,0.18444374,0.16087885,0.22272494,0.044849668,0.3477969,0.0053980406],"about_ca_topic_score_codex":0.0000050614344,"about_ca_topic_score_gemma":0.0001148238,"teacher_disagreement_score":0.9123926,"about_ca_system_score_codex":0.000069456786,"about_ca_system_score_gemma":0.00006766117,"threshold_uncertainty_score":0.98531866},"labels":[],"label_agreement":null},{"id":"W6958092758","doi":"10.60692/tre3k-1sp15","title":"Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Building information modeling; Process (computing); Software deployment; Facility management; Resource (disambiguation); Information system; System deployment","score_opus":0.01968857803279198,"score_gpt":0.20793435599524135,"score_spread":0.18824577796244937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958092758","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57280314,0.00003643407,0.4123721,0.00004526241,0.005347995,0.0021045946,0.0008604881,0.002038076,0.004391923],"genre_scores_gemma":[0.99712414,1.0292988e-7,0.00079034804,0.000044331588,0.000106948806,0.0014804006,0.00035741535,0.000027193053,0.00006915049],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982834,0.000099533754,0.00070966326,0.00015950132,0.0004889153,0.0002589844],"domain_scores_gemma":[0.9987634,0.000013416175,0.00023841296,0.0002824977,0.000631686,0.00007060876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00077522726,0.00023263626,0.00023776322,0.00044288603,0.00040838783,0.00021307249,0.00018158568,0.00011692495,0.00009789258],"category_scores_gemma":[0.000023564859,0.00022058423,0.00011112578,0.000491305,0.000014815854,0.00076033047,0.00003111569,0.00020389896,0.00016694954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022214775,0.000022095974,0.022841953,0.010469431,0.0012464884,0.000006698231,0.1715171,0.60306776,0.00074613426,0.07354988,0.014663794,0.09964719],"study_design_scores_gemma":[0.00262911,0.00013726926,0.0021782091,0.00026907533,0.00016687476,0.00022723137,0.1498309,0.8287395,0.00199928,0.0000042704164,0.013185074,0.0006331716],"about_ca_topic_score_codex":0.000012428242,"about_ca_topic_score_gemma":5.0829976e-7,"teacher_disagreement_score":0.424321,"about_ca_system_score_codex":0.0009591896,"about_ca_system_score_gemma":0.000086374996,"threshold_uncertainty_score":0.89951634},"labels":[],"label_agreement":null},{"id":"W6958163608","doi":"10.60692/63j82-qqc18","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2023,"lang":"en","type":"article","venue":"Greater South Information System","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Abbott (Canada)","funders":"","keywords":"Energy consumption; Building information modeling; Energy (signal processing); Energy accounting; Consumption (sociology); Energy modeling; Energy conservation; Order (exchange); Energy management","score_opus":0.02392247102956034,"score_gpt":0.1963721344864106,"score_spread":0.17244966345685026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958163608","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48810008,0.000002007737,0.510997,0.0000018241972,0.00013902478,0.00007970539,0.00001339787,0.00042275942,0.00024421097],"genre_scores_gemma":[0.99869686,1.9822967e-7,0.0011769584,0.000012860391,0.00002467606,0.00003372807,0.00003434371,0.000009239896,0.000011106343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992505,0.000034947203,0.00037431048,0.00008586595,0.00014308488,0.00011130298],"domain_scores_gemma":[0.9996098,0.000004690168,0.00007869838,0.00015845684,0.00009959325,0.00004870774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011744502,0.000120953904,0.0001532055,0.0010040198,0.00013282592,0.00018542442,0.00003442501,0.0000715976,0.000016906139],"category_scores_gemma":[0.0000031064512,0.00010950117,0.000045819437,0.0013845598,0.000011873087,0.00054275105,0.000011123505,0.00003996092,0.000022038555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004109336,5.694705e-7,0.04031775,0.00005757053,0.0001391166,0.000015274287,0.0088865245,0.9497072,6.9421833e-7,0.00008861804,0.0000070049837,0.0007755686],"study_design_scores_gemma":[0.00034745075,0.000009694179,0.0016854117,0.000016975171,0.00014972863,0.000078396835,0.016277049,0.98117757,0.00011111981,2.9370256e-7,0.00002827057,0.000118042015],"about_ca_topic_score_codex":0.000052321557,"about_ca_topic_score_gemma":0.000004749149,"teacher_disagreement_score":0.5105968,"about_ca_system_score_codex":0.00006344029,"about_ca_system_score_gemma":0.000010776752,"threshold_uncertainty_score":0.4465328},"labels":[],"label_agreement":null},{"id":"W6958332583","doi":"10.6084/m9.figshare.26688050.v1","title":"Additional file 2 of The proteome of the blood–brain barrier in rat and mouse: highly specific identification of proteins on the luminal surface of brain microvessels by in vivo glycocapture","year":2024,"lang":"en","type":"dataset","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Proteome; In vivo; Identification (biology); Decoy; Table (database)","score_opus":0.005922220157967751,"score_gpt":0.18025211306507147,"score_spread":0.1743298929071037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958332583","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009496941,0.00017130368,1.0976271e-7,0.00015625844,0.000084462336,0.000886118,0.9977026,0.0000073240303,0.000042152024],"genre_scores_gemma":[0.0016768527,0.0000061445644,0.000008962966,0.000017557322,0.000039798484,0.0005706093,0.9970741,0.000017821189,0.0005881411],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988339,0.0000998722,0.00049716973,0.00018857657,0.00028177528,0.00009872785],"domain_scores_gemma":[0.998724,0.00045155542,0.0003103838,0.00041343764,0.00008595875,0.000014691305],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00008163703,0.00018027802,0.00022224299,0.00008819772,0.000024142408,0.000021451242,0.0003620922,0.00022814743,0.3007016],"category_scores_gemma":[0.00060430466,0.00011169765,0.000086039,0.00039988995,0.00006841837,0.00006048134,0.00006214475,0.00046154647,0.000025195592],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000828279,0.000024559551,4.0996042e-7,0.0008100779,0.000020550582,3.1339906e-7,0.000060517577,0.000092645525,0.0466138,0.00001596599,0.95232785,0.00002505094],"study_design_scores_gemma":[0.000096794596,0.00001723205,0.00007645035,0.004100663,0.000007754696,0.000003533378,0.00007050033,0.000059484377,0.1958903,0.000040606574,0.7995452,0.00009142769],"about_ca_topic_score_codex":0.000020389529,"about_ca_topic_score_gemma":0.00014445414,"teacher_disagreement_score":0.30067638,"about_ca_system_score_codex":0.000032805146,"about_ca_system_score_gemma":0.00008973627,"threshold_uncertainty_score":0.69993764},"labels":[],"label_agreement":null},{"id":"W6967234867","doi":"10.5281/zenodo.10817950","title":"ANNEXE. Organizational competencies for BIM adoption","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Competence (human resources); Organizational structure; Key (lock); Process (computing)","score_opus":0.021449310914312944,"score_gpt":0.2130947900974754,"score_spread":0.19164547918316244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967234867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025806481,0.0017418194,0.80032176,0.001411245,0.0024935752,0.0012103856,0.0011854467,0.012117007,0.15371226],"genre_scores_gemma":[0.9922705,0.00015879182,0.0019463396,0.00005887407,0.0004990319,2.4012883e-7,0.003068396,0.0012864576,0.0007113634],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991593,0.00004053983,0.00019116641,0.00022169219,0.0001858489,0.0002015042],"domain_scores_gemma":[0.99933124,0.000023311884,0.000018398605,0.00015452926,0.0003974296,0.000075108466],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0002020034,0.00011577213,0.000086025175,0.00022973023,0.00081554975,0.00075282605,0.0002645438,0.000067065106,0.0055148285],"category_scores_gemma":[0.00010378828,0.00012190519,0.000047399102,0.00053867704,0.00007303119,0.00031162307,0.00008564897,0.00014924856,0.0026486337],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025928424,0.000039505612,0.0000040965574,0.00038030394,0.00011271282,0.000004247081,0.0009191126,0.0023958855,0.025112117,0.42110842,0.27396613,0.27593154],"study_design_scores_gemma":[0.00015925776,0.00006490851,0.0001101538,0.00003951998,0.000014575975,0.000094994786,0.0002481523,0.032379545,0.0012775995,0.0019371047,0.9635236,0.00015055471],"about_ca_topic_score_codex":0.000001587891,"about_ca_topic_score_gemma":2.5732282e-7,"teacher_disagreement_score":0.96646404,"about_ca_system_score_codex":0.0001326814,"about_ca_system_score_gemma":0.000004016953,"threshold_uncertainty_score":0.99812794},"labels":[],"label_agreement":null},{"id":"W6967248217","doi":"10.5281/zenodo.10166982","title":"Atheta (Datomicra) dadopora Thomson","year":2023,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada; Agriculture and Agri-Food Canada; Canadian Forest Service","funders":"","keywords":"Balsam; Yellow birch; Black spruce; Bark (sound); Maple; Hardwood; Swamp; Plant litter","score_opus":0.02568189871025112,"score_gpt":0.2186263458914383,"score_spread":0.1929444471811872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967248217","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3014108,0.00021754699,0.026417335,0.0011709763,0.0012962401,0.0007065449,0.00035142986,0.019254375,0.64917475],"genre_scores_gemma":[0.99601126,0.00014287974,0.0001278551,0.00003709722,0.00016846984,4.6017437e-8,0.0012210587,0.0010372081,0.0012541097],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99916327,0.000065205466,0.00016084938,0.00018859586,0.00018490593,0.0002371706],"domain_scores_gemma":[0.99949867,0.000008920399,0.000025214826,0.00026698902,0.00011315251,0.00008705684],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00026862102,0.00009881316,0.000083545616,0.00022241061,0.00076599116,0.00036854346,0.00038359588,0.00005676029,0.0049294573],"category_scores_gemma":[0.00007667577,0.00010601187,0.00004023032,0.0006724928,0.00006298702,0.00020219937,0.0001900719,0.000180158,0.022990698],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000144997875,0.000019351784,0.0000070776387,0.000047802605,0.00004277731,0.000009066429,0.0007183669,0.00070890295,0.014399351,0.015169555,0.49457407,0.47428918],"study_design_scores_gemma":[0.00019058646,0.000029439509,0.0005219086,0.000012616319,0.000005911192,0.000059123482,0.00029279798,0.00913951,0.001400056,0.00047176494,0.9877482,0.00012807504],"about_ca_topic_score_codex":0.0000027692438,"about_ca_topic_score_gemma":1.5845232e-7,"teacher_disagreement_score":0.69460046,"about_ca_system_score_codex":0.00007555836,"about_ca_system_score_gemma":0.0000012619541,"threshold_uncertainty_score":0.99598014},"labels":[],"label_agreement":null},{"id":"W6967556242","doi":"10.5281/zenodo.10817951","title":"ANNEXE. Organizational competencies for BIM adoption","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Competence (human resources); Organizational structure; Key (lock); Process (computing)","score_opus":0.021449310914312944,"score_gpt":0.2130947900974754,"score_spread":0.19164547918316244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967556242","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025806481,0.0017418194,0.80032176,0.001411245,0.0024935752,0.0012103856,0.0011854467,0.012117007,0.15371226],"genre_scores_gemma":[0.9922705,0.00015879182,0.0019463396,0.00005887407,0.0004990319,2.4012883e-7,0.003068396,0.0012864576,0.0007113634],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991593,0.00004053983,0.00019116641,0.00022169219,0.0001858489,0.0002015042],"domain_scores_gemma":[0.99933124,0.000023311884,0.000018398605,0.00015452926,0.0003974296,0.000075108466],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0002020034,0.00011577213,0.000086025175,0.00022973023,0.00081554975,0.00075282605,0.0002645438,0.000067065106,0.0055148285],"category_scores_gemma":[0.00010378828,0.00012190519,0.000047399102,0.00053867704,0.00007303119,0.00031162307,0.00008564897,0.00014924856,0.0026486337],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025928424,0.000039505612,0.0000040965574,0.00038030394,0.00011271282,0.000004247081,0.0009191126,0.0023958855,0.025112117,0.42110842,0.27396613,0.27593154],"study_design_scores_gemma":[0.00015925776,0.00006490851,0.0001101538,0.00003951998,0.000014575975,0.000094994786,0.0002481523,0.032379545,0.0012775995,0.0019371047,0.9635236,0.00015055471],"about_ca_topic_score_codex":0.000001587891,"about_ca_topic_score_gemma":2.5732282e-7,"teacher_disagreement_score":0.96646404,"about_ca_system_score_codex":0.0001326814,"about_ca_system_score_gemma":0.000004016953,"threshold_uncertainty_score":0.99812794},"labels":[],"label_agreement":null},{"id":"W6976681777","doi":"10.60692/32jny-c4670","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2023,"lang":"en","type":"article","venue":"Greater South Information System","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Abbott (Canada)","funders":"","keywords":"Energy consumption; Building information modeling; Energy (signal processing); Energy accounting; Consumption (sociology); Energy modeling; Energy conservation; Order (exchange); Energy management","score_opus":0.02392247102956034,"score_gpt":0.1963721344864106,"score_spread":0.17244966345685026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6976681777","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.48810008,0.000002007737,0.510997,0.0000018241972,0.00013902478,0.00007970539,0.00001339787,0.00042275942,0.00024421097],"genre_scores_gemma":[0.99869686,1.9822967e-7,0.0011769584,0.000012860391,0.00002467606,0.00003372807,0.00003434371,0.000009239896,0.000011106343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992505,0.000034947203,0.00037431048,0.00008586595,0.00014308488,0.00011130298],"domain_scores_gemma":[0.9996098,0.000004690168,0.00007869838,0.00015845684,0.00009959325,0.00004870774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011744502,0.000120953904,0.0001532055,0.0010040198,0.00013282592,0.00018542442,0.00003442501,0.0000715976,0.000016906139],"category_scores_gemma":[0.0000031064512,0.00010950117,0.000045819437,0.0013845598,0.000011873087,0.00054275105,0.000011123505,0.00003996092,0.000022038555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004109336,5.694705e-7,0.04031775,0.00005757053,0.0001391166,0.000015274287,0.0088865245,0.9497072,6.9421833e-7,0.00008861804,0.0000070049837,0.0007755686],"study_design_scores_gemma":[0.00034745075,0.000009694179,0.0016854117,0.000016975171,0.00014972863,0.000078396835,0.016277049,0.98117757,0.00011111981,2.9370256e-7,0.00002827057,0.000118042015],"about_ca_topic_score_codex":0.000052321557,"about_ca_topic_score_gemma":0.000004749149,"teacher_disagreement_score":0.5105968,"about_ca_system_score_codex":0.00006344029,"about_ca_system_score_gemma":0.000010776752,"threshold_uncertainty_score":0.4465328},"labels":[],"label_agreement":null},{"id":"W6977397330","doi":"10.6084/m9.figshare.21625526.v2","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2023,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"EEA Grants/Norway Grants","keywords":"Software deployment; Bridge (graph theory); Process (computing); Productivity; Construction industry; Adaptation (eye)","score_opus":0.06487348351168756,"score_gpt":0.2701318257887526,"score_spread":0.20525834227706505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977397330","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83530617,0.00031077195,0.011460558,0.0014993293,0.003964806,0.0046252697,0.13380884,0.0019345965,0.007089656],"genre_scores_gemma":[0.9935523,0.0000016500733,0.00028627683,0.0000047858525,0.00015359039,0.00027573542,0.0057083475,0.0000072361254,0.000010071115],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961877,0.000012925242,0.00013951474,0.000077490324,0.00006995452,0.000081368584],"domain_scores_gemma":[0.9997708,0.00005220331,0.000026705293,0.00009029941,0.000051393345,0.000008568279],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00007233471,0.000051367337,0.00005475877,0.000080698395,0.00002635971,0.000015363741,0.00006491391,0.00010696319,0.0014418049],"category_scores_gemma":[0.00017337312,0.000043757547,0.000026001508,0.0003928025,0.0000090143685,0.0001023933,0.000006010068,0.00015872349,0.00007976839],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028763776,0.00003265047,0.00027057715,0.0005627317,0.000020015674,0.0000014528897,0.0010207031,0.073942974,0.0029295573,0.009576075,0.051391393,0.8602231],"study_design_scores_gemma":[0.00036099096,0.00024181943,0.031754293,0.0022809128,0.00003889315,0.00009932354,0.013766616,0.6730104,0.18775153,0.03386858,0.055841506,0.000985121],"about_ca_topic_score_codex":0.000001356558,"about_ca_topic_score_gemma":0.000012399232,"teacher_disagreement_score":0.85923797,"about_ca_system_score_codex":0.000016778144,"about_ca_system_score_gemma":0.000014469117,"threshold_uncertainty_score":0.999471},"labels":[],"label_agreement":null},{"id":"W6977425687","doi":"10.6084/m9.figshare.21641675","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"dissertation","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construct (python library); Process (computing); Productivity; Work (physics); Plan (archaeology); Visibility; Construction industry","score_opus":0.03973368122048685,"score_gpt":0.27491912172569494,"score_spread":0.2351854405052081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977425687","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"dataset","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30480903,0.0036384016,0.0017715694,0.0003308398,0.01804866,0.012665701,0.6206908,0.0011884195,0.036856525],"genre_scores_gemma":[0.6315401,0.000010939031,0.0005104056,0.000008873978,0.00047980054,0.0029206285,0.36429334,0.000049924904,0.00018594273],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992263,0.00003183465,0.0003033267,0.0001646659,0.00016725446,0.00010664906],"domain_scores_gemma":[0.9995379,0.00006285332,0.00012426234,0.0001583446,0.000104886225,0.00001178512],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000084621104,0.00013652709,0.0001427678,0.00014931767,0.00006211989,0.000027645958,0.00014981502,0.00032518973,0.015581242],"category_scores_gemma":[0.00019445966,0.0001291331,0.00007185156,0.0003063179,0.000006774383,0.00011317588,0.000005893758,0.00065694674,0.000016692662],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016257276,0.00009911497,0.00003351438,0.00294428,0.0000688287,0.0000020531077,0.0031362625,0.032469362,0.0010500351,0.0072446424,0.034998655,0.91779065],"study_design_scores_gemma":[0.001008436,0.0011678273,0.017870935,0.013053098,0.0005214015,0.0002861716,0.18444374,0.16087885,0.22272494,0.044849668,0.3477969,0.0053980406],"about_ca_topic_score_codex":0.0000050614344,"about_ca_topic_score_gemma":0.0001148238,"teacher_disagreement_score":0.9123926,"about_ca_system_score_codex":0.000069456786,"about_ca_system_score_gemma":0.00006766117,"threshold_uncertainty_score":0.98531866},"labels":[],"label_agreement":null},{"id":"W6979915495","doi":"","title":"Analysis of the Adoption and Implementation of Virtual Reality Technologies for Modular Construction","year":2009,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Virtual reality; Modular design; Key (lock); Work (physics); Augmented reality","score_opus":0.008933182856943096,"score_gpt":0.24512214896967024,"score_spread":0.23618896611272716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6979915495","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92945594,0.000017696779,0.06985413,0.00014629062,0.000063964704,0.000110494024,0.00003248443,0.000053721018,0.0002652524],"genre_scores_gemma":[0.9981636,0.00002893764,0.0017813919,0.0000024022763,0.0000048985066,0.000006517542,0.000009118443,0.0000014214448,0.0000017565328],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997193,0.000006365755,0.00013782334,0.000048273138,0.000051945168,0.00003626483],"domain_scores_gemma":[0.99980974,0.000008736158,0.00004887413,0.000081310456,0.000047348265,0.0000040144237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052608026,0.00003466548,0.00007917716,0.000086755244,0.000021585582,0.0000036181132,0.000027734612,0.00003946728,0.0000095459145],"category_scores_gemma":[0.000007626735,0.000027469792,0.000041713727,0.00023350942,0.00004674503,0.00005264365,0.0000031195152,0.00002540681,2.722062e-8],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073300153,0.0000042094043,0.0050942753,0.000014321313,0.00011341789,6.3763e-9,0.00011938517,0.0035522566,0.20326115,0.09615864,0.00004035452,0.69163465],"study_design_scores_gemma":[0.0005354384,0.00015445182,0.27333793,0.00001829141,0.0006908772,0.0000033765734,0.006609566,0.14445919,0.52704585,0.04676937,0.00023894504,0.00013670493],"about_ca_topic_score_codex":0.000005785079,"about_ca_topic_score_gemma":0.000023501412,"teacher_disagreement_score":0.6914979,"about_ca_system_score_codex":0.00001325473,"about_ca_system_score_gemma":0.0000043862883,"threshold_uncertainty_score":0.11201856},"labels":[],"label_agreement":null},{"id":"W6980217069","doi":"","title":"BIM Supports and Secure BIPV Design &amp; Engineering","year":2023,"lang":"en","type":"other","venue":"View","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas; Universitat Politècnica de Catalunya; Universidad de Antofagasta; Turun Yliopisto; Università di Catania; Technische Universiteit Delft; Université de Liège; University of Toronto; Technische Universität Berlin; Agroscope; Technische Universiteit Eindhoven; KU Leuven; Radboud Universiteit","keywords":"Building-integrated photovoltaics; Work (physics); Key (lock); Photovoltaic system","score_opus":0.012868205740812048,"score_gpt":0.2038154105325668,"score_spread":0.19094720479175475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980217069","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009746287,0.101504095,0.50602865,0.00016386963,0.012757323,0.0015798815,0.00019904536,0.02192554,0.3557441],"genre_scores_gemma":[0.00365132,0.07752705,0.036546,0.0001363529,0.0030380448,0.00046070872,0.00019594848,0.007245245,0.8711993],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995783,0.000006417976,0.00010683408,0.00012365347,0.00006633673,0.00011843242],"domain_scores_gemma":[0.9997846,0.000014754891,0.000019362493,0.00013100026,0.0000065892277,0.000043729175],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000044005035,0.00016389161,0.00016579698,0.00016152234,0.000010455927,0.000024576015,0.000040531944,0.00018495544,0.0010511957],"category_scores_gemma":[0.0000073142096,0.00015736624,0.000030479512,0.00013699968,0.000010755968,0.00002595726,0.000008196666,0.00013115891,0.00031608038],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.135824e-7,0.000003227874,0.000035203182,0.0009973627,0.00015198196,0.000012448324,0.00007168058,0.0008418582,0.0001380853,0.0039305696,0.8667889,0.12702794],"study_design_scores_gemma":[0.00004294129,0.0000035815729,0.000020910891,0.00038178873,0.000022254964,0.000020401903,0.0000032716634,0.0008992948,0.000030186402,0.000073757044,0.99832165,0.00017993152],"about_ca_topic_score_codex":0.000018528379,"about_ca_topic_score_gemma":0.00009688383,"teacher_disagreement_score":0.51545525,"about_ca_system_score_codex":0.000017097807,"about_ca_system_score_gemma":0.000008251237,"threshold_uncertainty_score":0.99986196},"labels":[],"label_agreement":null},{"id":"W6986689578","doi":"","title":"In Q1 2021, the “Cost-of-Construction Index” increased by 2.94% over a year : construction cost index - first quarter 2021","year":2021,"lang":"en","type":"article","venue":"Gallica (Bibliothèque nationale de France)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Index (typography); Power (physics); Cost analysis; Measure (data warehouse)","score_opus":0.004595401768025009,"score_gpt":0.20824979444148298,"score_spread":0.20365439267345797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6986689578","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8566356,0.004878823,0.09767135,0.004217552,0.0040228628,0.001694403,0.0006008509,0.00024409337,0.030034462],"genre_scores_gemma":[0.9961971,0.0012001974,0.0009888769,0.00018477156,0.00043886498,0.00025868078,0.00013352615,0.000036606176,0.0005613624],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983398,0.00010253149,0.00051646616,0.00030647346,0.00045284015,0.0002818979],"domain_scores_gemma":[0.99891794,0.0002308076,0.0001321781,0.0002893244,0.0003449823,0.00008476766],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00024877902,0.00021948044,0.00024834785,0.00077878445,0.0001216335,0.00014753218,0.00017286402,0.00030088288,0.0053051882],"category_scores_gemma":[0.00012468026,0.0002212235,0.0001142784,0.002800165,0.0001828244,0.00069848006,0.00002207581,0.00049952045,0.000032672502],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017843081,0.0002871366,0.7434781,0.00025700172,0.00036272992,0.000015540312,0.0009565293,0.018471293,0.012292452,0.04328938,0.13360594,0.04680543],"study_design_scores_gemma":[0.005049192,0.00005269722,0.291148,0.0003257474,0.00006662049,0.00026856663,0.0010960065,0.06774012,0.016905013,0.0074944063,0.60886174,0.0009918533],"about_ca_topic_score_codex":0.00020272497,"about_ca_topic_score_gemma":0.0007236246,"teacher_disagreement_score":0.47525582,"about_ca_system_score_codex":0.00027659573,"about_ca_system_score_gemma":0.00029078784,"threshold_uncertainty_score":0.9956041},"labels":[],"label_agreement":null},{"id":"W6987818756","doi":"","title":"Using the Internet to Transfer Knowledge on Concrete Durability: Improving and Fostering Knowledge Exchange, eWork and eBusiness in Architecture, Engineering and Construction","year":2002,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"U.S. Army Corps of Engineers; National Research Council Canada","keywords":"The Internet; Knowledge transfer; Government (linguistics); Information Dissemination; Technology transfer; Information transfer; Information system; Dissemination","score_opus":0.02378580382771166,"score_gpt":0.2176808134266009,"score_spread":0.19389500959888922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987818756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9709016,0.0012483896,0.02539066,0.00006730499,0.00037305287,0.00023539842,0.000003627411,0.00008788306,0.0016920741],"genre_scores_gemma":[0.9974809,0.00009625476,0.0022431451,0.000017535524,0.00009951813,0.000024459585,5.666305e-7,0.00002291483,0.000014650303],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993569,0.000027996892,0.00017950668,0.00021050853,0.000049075556,0.00017597925],"domain_scores_gemma":[0.99971914,0.00007941846,0.000009692435,0.000103496684,0.000024326828,0.00006390635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000114425486,0.00016836598,0.00015690099,0.00016875114,0.000053639757,0.00008003181,0.00004408493,0.000081849044,0.000029045474],"category_scores_gemma":[0.000024164416,0.00014329031,0.000016392412,0.00019607184,0.00007379878,0.000099686695,0.000043790373,0.00022436264,0.0000013036677],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033168613,0.000005707018,0.0009585559,0.0004980064,0.000028515085,0.000002446569,0.008462105,0.0012597857,0.13300109,0.0028283284,0.000033814158,0.85288846],"study_design_scores_gemma":[0.0013371366,0.00012883714,0.0039872527,0.0008507305,0.000053656197,0.00046818057,0.00071745476,0.9645959,0.022427302,0.00087729783,0.0038256699,0.0007305674],"about_ca_topic_score_codex":0.000011710309,"about_ca_topic_score_gemma":0.00007266317,"teacher_disagreement_score":0.9633361,"about_ca_system_score_codex":0.000049468148,"about_ca_system_score_gemma":0.0000037409582,"threshold_uncertainty_score":0.5843209},"labels":[],"label_agreement":null},{"id":"W6990339598","doi":"","title":"Developing a Community: Qualitative Approaches to Understanding the Role of Community Engagement in Gameswork","year":2023,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Social Sciences and Humanities Research Council of Canada; University of Toronto","keywords":"Qualitative research; Work (physics); Community engagement; Consumption (sociology); Investment (military); Qualitative property; Journalism; Content analysis","score_opus":0.15335893160788094,"score_gpt":0.25994143566378364,"score_spread":0.1065825040559027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990339598","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966383,0.000052776595,0.0010425681,0.00027387778,0.0001714522,0.00027044982,0.000019016104,0.00007904945,0.0014525383],"genre_scores_gemma":[0.99419636,0.000038255974,0.0009288146,0.000004651616,0.000006779543,0.000002606734,0.00019136553,0.00002292915,0.0046082535],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99875236,0.0007023733,0.00016126939,0.00007267974,0.00016371315,0.00014763013],"domain_scores_gemma":[0.99928075,0.00028232473,0.00010287538,0.00026456485,0.00004160135,0.000027884184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008249844,0.0001559037,0.00027583138,0.0003544205,0.00034832372,0.000014235395,0.00036685355,0.0001499259,0.000011807485],"category_scores_gemma":[0.000022015949,0.00016262577,0.00007306226,0.00049624103,0.00007334278,0.000092117116,0.00006808072,0.00087347475,0.000008110532],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003820948,0.000017004926,0.00008318179,0.00030104135,0.00011503004,4.3139943e-7,0.9760862,0.0013294815,0.00037061234,0.017969964,0.0000706069,0.0036182182],"study_design_scores_gemma":[0.00015177784,0.000030789055,0.0021734475,0.00039878214,0.000034553177,2.4922338e-7,0.98475504,0.0005245318,0.00089437846,0.010821384,0.000064945016,0.00015009746],"about_ca_topic_score_codex":0.029476631,"about_ca_topic_score_gemma":0.21365759,"teacher_disagreement_score":0.18418096,"about_ca_system_score_codex":0.0003258605,"about_ca_system_score_gemma":0.000044091386,"threshold_uncertainty_score":0.97698617},"labels":[],"label_agreement":null},{"id":"W6996021006","doi":"","title":"In Q3 2021, the “Cost-of-Construction Index” rose by 6.86% over a year : Construction cost index - third quarter 2021","year":2021,"lang":"en","type":"article","venue":"Gallica (Bibliothèque nationale de France)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rose (mathematics); Quarter (Canadian coin); Index (typography); Square (algebra); Power (physics)","score_opus":0.005146866553903096,"score_gpt":0.2175297634231343,"score_spread":0.2123828968692312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996021006","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76653105,0.0068469136,0.15882638,0.0050103418,0.0062792413,0.0019126849,0.0005721315,0.00031192641,0.053709347],"genre_scores_gemma":[0.9938923,0.0017914749,0.0015215802,0.00027845157,0.0005886537,0.00027997867,0.00012390752,0.000043989374,0.0014796328],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99825865,0.00011137582,0.0005340011,0.0003150991,0.0004875819,0.0002932775],"domain_scores_gemma":[0.99894124,0.0001851924,0.00013502722,0.0002964828,0.00036363807,0.00007844424],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00027254093,0.00022161774,0.00025249858,0.0007574853,0.00010472791,0.00016047522,0.00017650017,0.00031990706,0.0033027425],"category_scores_gemma":[0.00010742228,0.00022020545,0.000120340344,0.002784322,0.00018794321,0.0007866258,0.000023533103,0.0005752179,0.000037999227],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018380654,0.00032304577,0.5363832,0.00025065822,0.00041657593,0.000018120856,0.0015941527,0.02576534,0.027170956,0.09309475,0.21730967,0.09748971],"study_design_scores_gemma":[0.0050191944,0.00006575906,0.22889055,0.0003157514,0.00007107494,0.00034291376,0.0017584723,0.06831803,0.027811117,0.016497089,0.64972675,0.0011832928],"about_ca_topic_score_codex":0.000075155935,"about_ca_topic_score_gemma":0.000289884,"teacher_disagreement_score":0.4324171,"about_ca_system_score_codex":0.00025364626,"about_ca_system_score_gemma":0.00029509945,"threshold_uncertainty_score":0.99760836},"labels":[],"label_agreement":null},{"id":"W6996630583","doi":"","title":"So Where the Bloody Hell Are You?","year":2014,"lang":"en","type":"other","venue":"CBS Research Portal (Copenhagen Business School)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Slogan; Offensive; Tourism; Globalization; Face (sociological concept); Football; Hollywood; Surprise; Shot (pellet)","score_opus":0.02512625123010229,"score_gpt":0.28040415472432995,"score_spread":0.25527790349422763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996630583","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00031381406,0.0203285,0.0011465225,0.00047122125,0.0019360714,0.0010433644,0.00011243339,0.00083545427,0.97381264],"genre_scores_gemma":[0.016353436,0.002826792,0.00015735273,0.00007402541,0.0028416584,0.00034151218,0.00016345218,0.0009105757,0.9763312],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99698347,0.0002098914,0.00044718545,0.0005609599,0.0010227236,0.0007757897],"domain_scores_gemma":[0.99783504,0.000066330125,0.00014771032,0.001143879,0.00052495534,0.00028208172],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0007453703,0.0004990385,0.00049216714,0.00047194047,0.00033895875,0.00067082234,0.00096159923,0.0006335526,0.11129763],"category_scores_gemma":[0.0002474768,0.0003667986,0.00013588507,0.0011433979,0.0003943949,0.000194684,0.00016077433,0.0014842829,0.026375823],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007127202,0.000019294086,0.00009042007,0.00037694513,0.00012515286,0.00004969607,0.000016084245,0.000091253765,0.000265227,0.00041231018,0.99191093,0.0066355793],"study_design_scores_gemma":[0.00027203903,0.000013894747,0.0012115774,0.000571473,0.00003430087,0.00004430556,0.00025207168,0.00030892552,0.00019624259,0.00007218545,0.9965932,0.0004298253],"about_ca_topic_score_codex":0.00060741464,"about_ca_topic_score_gemma":0.0025277867,"teacher_disagreement_score":0.08492181,"about_ca_system_score_codex":0.00007309356,"about_ca_system_score_gemma":0.0002925157,"threshold_uncertainty_score":0.9998784},"labels":[],"label_agreement":null},{"id":"W6997176477","doi":"","title":"UGE International Reports 2015 First Quarter Financial Results - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Energy (signal processing); Work (physics); High energy","score_opus":0.0059111979192492245,"score_gpt":0.19720912181236835,"score_spread":0.19129792389311914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997176477","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000002241585,0.0005589928,0.0047780997,0.00021598478,0.008819978,0.000048520975,0.00010844195,0.0007055916,0.98476213],"genre_scores_gemma":[0.0014300997,0.00023005354,0.00074867066,0.000107031665,0.0029196462,0.000034745914,0.0009240721,0.00020576756,0.9933999],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989073,0.00000926173,0.00039596282,0.0002709125,0.0002593676,0.00015717775],"domain_scores_gemma":[0.9993887,0.0000066452303,0.00012015795,0.0003192982,0.0000776508,0.00008754167],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000056892764,0.00024943962,0.00020437887,0.00024011426,0.000019485971,0.000050058552,0.00012236006,0.00041386345,0.0028738803],"category_scores_gemma":[0.000028346725,0.00022792348,0.00007137205,0.00009802668,0.00002664814,0.00007850161,0.000019043075,0.00013874158,0.00012534417],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007894208,0.0000072465077,0.0000074911004,0.0000063700677,0.00004488639,0.000021015954,0.000020257305,0.00016897258,0.000003077067,0.0027963473,0.9923028,0.004613651],"study_design_scores_gemma":[0.00022573923,0.000013328839,0.000007027772,0.00005628737,0.000012305956,0.00006805956,0.000014861096,0.0008138994,0.000034323384,0.00039467597,0.9980954,0.00026411933],"about_ca_topic_score_codex":0.0013155622,"about_ca_topic_score_gemma":0.017279584,"teacher_disagreement_score":0.015964022,"about_ca_system_score_codex":0.00009569748,"about_ca_system_score_gemma":0.00007207793,"threshold_uncertainty_score":0.99803764},"labels":[],"label_agreement":null},{"id":"W6999042324","doi":"","title":"BIM Introduction for QS Practitioners. Invited Presentation","year":2012,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Presentation (obstetrics); Key (lock); Focus (optics)","score_opus":0.012573451607888485,"score_gpt":0.23719412576614404,"score_spread":0.22462067415825557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999042324","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27862886,0.00019192295,0.6719816,0.011795957,0.010122693,0.0009066065,0.0000362842,0.0011521688,0.025183937],"genre_scores_gemma":[0.9890862,0.000013254204,0.008620159,0.00006938199,0.001813892,0.00011490739,0.00010131505,0.000013877718,0.00016702147],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996567,0.00001015831,0.000097104545,0.000059336347,0.00006450772,0.00011219681],"domain_scores_gemma":[0.99980515,0.000018019757,0.000021345353,0.00007287438,0.000048378737,0.000034258363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006954457,0.00005397325,0.000044755638,0.00006538186,0.000045609035,0.000019205967,0.000021328398,0.000048741145,0.00023581511],"category_scores_gemma":[0.000030473431,0.000054899992,0.00002429334,0.000100759964,0.00001290708,0.0004797517,0.0000023762366,0.000057805584,0.00002818159],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037775895,0.00005054393,0.0014694068,0.00008159121,0.0000635476,6.981126e-8,0.00058777427,0.0012339825,0.366894,0.16536167,0.35637784,0.10784178],"study_design_scores_gemma":[0.0006238483,0.00004324988,0.0038511592,0.000007874557,0.000053654778,0.000033389013,0.0006488858,0.029454809,0.16618364,0.013673787,0.7851451,0.00028058846],"about_ca_topic_score_codex":0.0000013772916,"about_ca_topic_score_gemma":0.000001865219,"teacher_disagreement_score":0.7104573,"about_ca_system_score_codex":0.000041474494,"about_ca_system_score_gemma":0.0000031090394,"threshold_uncertainty_score":0.258201},"labels":[],"label_agreement":null},{"id":"W6999142127","doi":"","title":"Challenges and Opportunities for the Canadian Construction IT Industry","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construction industry; Information technology; Government (linguistics); Industry 4.0; Work (physics)","score_opus":0.0711636855586013,"score_gpt":0.24077593722735172,"score_spread":0.16961225166875044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999142127","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06341269,0.002652079,0.008311254,0.019893557,0.002246336,0.0003612821,0.000027080288,0.00021718953,0.9028785],"genre_scores_gemma":[0.9983601,0.0005652317,0.0005711971,0.0001312923,0.00014292807,0.000013240102,0.0000019049967,0.000006268319,0.00020784332],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99975294,0.0000027863587,0.000064560256,0.000043922686,0.000036327147,0.000099480436],"domain_scores_gemma":[0.9998153,0.000037692986,0.000007861018,0.00005250338,0.000028550969,0.000058099078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00011909914,0.00004400723,0.000034624027,0.00004812445,0.000103194056,0.000019933143,0.000026182266,0.000112664864,0.000059573435],"category_scores_gemma":[0.00000674704,0.00003540223,0.000010394374,0.000016010179,0.000061731305,0.000051560648,0.000001865359,0.00011640897,9.985538e-7],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014679333,3.7080517e-7,0.000037771762,0.000008538528,0.000011225415,5.2086017e-7,0.00019894353,0.00000879764,0.0001313036,0.1520868,0.0016751504,0.84583914],"study_design_scores_gemma":[0.00031607138,0.000031265252,0.0071057226,0.00003303702,0.000034323355,0.00019697357,0.022155803,0.005323272,0.0026734187,0.021148961,0.9407398,0.00024132858],"about_ca_topic_score_codex":0.00029777177,"about_ca_topic_score_gemma":0.08406353,"teacher_disagreement_score":0.9390647,"about_ca_system_score_codex":0.000032698354,"about_ca_system_score_gemma":0.0000293026,"threshold_uncertainty_score":0.9326499},"labels":[],"label_agreement":null},{"id":"W7001552762","doi":"","title":"Lâinfluence de la coopÃ©ration patronale-syndicale sur le fonctionnement et le degrÃ© dâautonomie des Ã©quipes de travail","year":2010,"lang":"fr","type":"other","venue":"Library and Archives Canada (Government of Canada)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nucleofection; Fusible alloy; Limiting; Demotion","score_opus":0.0023282994327802455,"score_gpt":0.13217972361939234,"score_spread":0.1298514241866121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7001552762","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12838557,0.0018573119,0.016443381,0.0030552337,0.0006414583,0.00029902114,0.0003571104,0.000054119035,0.8489068],"genre_scores_gemma":[0.89995927,0.00092043047,0.014378151,0.0005811639,0.00019719933,0.000049400358,0.000029638544,0.00010866172,0.0837761],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982753,0.00014598056,0.00035243775,0.00026135423,0.00061280647,0.00035212142],"domain_scores_gemma":[0.9991491,0.00022904533,0.00017120788,0.0001725698,0.0000015336999,0.00027653202],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000036205995,0.00030040342,0.0002733392,0.000042419655,0.00023785217,0.00007218033,0.00018152551,0.00015915689,0.0009406523],"category_scores_gemma":[0.000008498131,0.000337213,0.000052067528,0.00006302865,0.0003120308,0.00037487567,0.000043983455,0.00041939798,2.4830605e-8],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014011933,0.000106658576,0.020500705,0.0006408462,0.00027145236,0.000029256811,0.0003729614,0.004535145,0.07104617,0.654814,0.0046409257,0.24290174],"study_design_scores_gemma":[0.0012344348,0.00008994423,0.17985435,0.00052417896,0.00008965908,0.00007469658,0.00244768,0.017885596,0.10792071,0.0047891727,0.6843667,0.00072285155],"about_ca_topic_score_codex":0.04107222,"about_ca_topic_score_gemma":0.35169953,"teacher_disagreement_score":0.77157366,"about_ca_system_score_codex":0.00006246943,"about_ca_system_score_gemma":0.0062948978,"threshold_uncertainty_score":0.99997264},"labels":[],"label_agreement":null},{"id":"W7007882298","doi":"","title":"Analyzing the defensibility of visual simulations through post construction appraisal for Dundas Square and HtO Park","year":2009,"lang":"en","type":"dissertation","venue":"The Atrium (University of Guelph)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Set (abstract data type); Process (computing); Square (algebra); Visual inspection; Validity","score_opus":0.010661752324048887,"score_gpt":0.247103159407349,"score_spread":0.2364414070833001,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7007882298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9850918,0.00036986338,0.012602359,0.00013353233,0.00045747755,0.00038082254,0.00014512414,0.00005974658,0.00075924635],"genre_scores_gemma":[0.9984304,0.000075243246,0.0009614604,0.0000036415722,0.00006228772,4.862749e-7,0.00036554862,0.0000120444365,0.00008890566],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9993523,0.00004777963,0.00020176635,0.00016097011,0.00012424157,0.0001129682],"domain_scores_gemma":[0.9989695,0.00026048053,0.0002053905,0.00020935539,0.0003329368,0.000022339658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00012373237,0.00015334006,0.0002459765,0.00008832078,0.00031373784,0.00001644246,0.00014919593,0.00018783877,0.00003885775],"category_scores_gemma":[0.00004930901,0.00013261981,0.00016579998,0.00023308762,0.00019229614,0.00018698603,0.000012355353,0.00019054653,0.0000010714609],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003510358,0.00034566518,0.01187032,0.004750752,0.0032036905,0.000004162355,0.07134322,0.065287195,0.30168605,0.1164311,0.0037172248,0.41785026],"study_design_scores_gemma":[0.002595153,0.00060372707,0.7128417,0.00041121215,0.0027799087,0.0000381297,0.16977525,0.084931344,0.0047832876,0.015498397,0.0046443795,0.0010975231],"about_ca_topic_score_codex":0.00028834134,"about_ca_topic_score_gemma":0.0019240609,"teacher_disagreement_score":0.70097136,"about_ca_system_score_codex":0.000034025914,"about_ca_system_score_gemma":0.000050725743,"threshold_uncertainty_score":0.54080784},"labels":[],"label_agreement":null},{"id":"W7008183742","doi":"","title":"BIM Standards Around The World A Review of BIM Standards in the Global AEC Industry and BIM Roles of Project Stakeholders","year":2019,"lang":"en","type":"article","venue":"Global Science & Technology Forum Journal of Engineering Technology (Global Science & Technology Forum)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Construction industry; Project stakeholder; Stakeholder; Project management","score_opus":0.009405521714982117,"score_gpt":0.27084287549680003,"score_spread":0.2614373537818179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008183742","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9411025,0.03247314,0.00637708,0.015565916,0.0010969386,0.0011608069,0.00032396137,0.00067009963,0.0012295286],"genre_scores_gemma":[0.9941781,0.0025131113,0.003111553,0.00011755325,0.000018002624,0.000043098065,7.840988e-7,0.000015507174,0.0000022767167],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9941963,0.000036632377,0.0015165843,0.0007122306,0.0019705486,0.001567714],"domain_scores_gemma":[0.9964478,0.000047780184,0.00078863406,0.0012357589,0.0013609654,0.000119076096],"candidate_categories":["metaepi_narrow","bibliometrics","sts"],"consensus_categories":[],"category_scores_codex":[0.0041089733,0.0005722071,0.0010325203,0.0037129212,0.00036752643,0.00009516925,0.0048607923,0.0011125465,0.00001275938],"category_scores_gemma":[0.0015487921,0.0003962091,0.00018522279,0.038504463,0.010414499,0.0009298661,0.0007825571,0.0019606731,0.0000019179602],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042088643,0.000088002984,0.16043751,0.00028913477,0.00009212408,0.00003087292,0.000024347984,0.0020239977,0.0024410065,0.7221041,0.00042859293,0.111998275],"study_design_scores_gemma":[0.009030485,0.008544233,0.022476533,0.025910517,0.0009437625,0.028838694,0.07605211,0.01803409,0.086657666,0.5315591,0.18698426,0.0049685608],"about_ca_topic_score_codex":0.000031692718,"about_ca_topic_score_gemma":0.00029895557,"teacher_disagreement_score":0.19054495,"about_ca_system_score_codex":0.0021708163,"about_ca_system_score_gemma":0.0019957763,"threshold_uncertainty_score":0.99984896},"labels":[],"label_agreement":null},{"id":"W7008245790","doi":"","title":"BIM Integrated Bid Proposal Evaluation Tool to Aid Sustainable Procurement of Water supply infrastructure projects","year":2022,"lang":"en","type":"dissertation","venue":"Scholarship at UWindsor (University of Windsor)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Sustainability; Water supply; Standardization; Production (economics)","score_opus":0.008123277887187605,"score_gpt":0.21489478155318512,"score_spread":0.2067715036659975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008245790","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9932497,0.0001542195,0.000099342236,0.00008545376,0.00081182,0.002112119,0.00014797307,0.00016200662,0.00317734],"genre_scores_gemma":[0.9860864,0.000024278343,0.0015960475,0.000013725563,0.000060017173,0.00003410131,0.00377304,0.000078574885,0.008333758],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99715614,0.00019084202,0.00045658046,0.00052508636,0.0011829482,0.0004884079],"domain_scores_gemma":[0.99793184,0.000017211722,0.00024607874,0.00045407016,0.0012279365,0.00012284299],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0007723024,0.00044984615,0.0005371239,0.0010752656,0.00038395973,0.00005258619,0.000560669,0.0005202832,0.0052076215],"category_scores_gemma":[0.00008514974,0.00046906734,0.00022640897,0.00089278264,0.000064492786,0.0007235576,0.00012513445,0.0009131182,0.000038799677],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009613623,0.0008256083,0.05187945,0.014331803,0.0034058716,0.0001489091,0.112190396,0.035880297,0.6087812,0.013353519,0.018576914,0.13101237],"study_design_scores_gemma":[0.0075584557,0.0018763168,0.14553571,0.00138783,0.0021434124,0.000059919574,0.186464,0.0035125546,0.5392642,0.005439395,0.10311067,0.0036475204],"about_ca_topic_score_codex":0.0001869448,"about_ca_topic_score_gemma":0.0006879992,"teacher_disagreement_score":0.12736484,"about_ca_system_score_codex":0.0010959815,"about_ca_system_score_gemma":0.00072996947,"threshold_uncertainty_score":0.9997761},"labels":[],"label_agreement":null},{"id":"W7008251265","doi":"","title":"BSI 2011/2012 - Building Information Modeling (BIM)","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information system; Information model; Domain (mathematical analysis); Identification (biology); Key (lock); Field (mathematics)","score_opus":0.01814070332592309,"score_gpt":0.19027007113972508,"score_spread":0.17212936781380198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008251265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13506484,0.000050801395,0.6551587,0.000019333778,0.0007445231,0.000064085114,0.0000030038038,0.00036914574,0.20852554],"genre_scores_gemma":[0.98229486,0.000020060847,0.017528296,0.000027206746,0.00006252356,0.000011170621,0.0000050384374,0.0000072732255,0.000043601634],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963725,0.0000041022786,0.00014266402,0.000040518105,0.0000702998,0.000105150044],"domain_scores_gemma":[0.99982506,0.0000030020785,0.000014753951,0.000087933804,0.000036354028,0.000032896998],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00004994458,0.00006356967,0.000050976625,0.00007415422,0.00003880811,0.000020222331,0.00005385378,0.00005597271,0.0011625935],"category_scores_gemma":[0.0000037928069,0.00006308572,0.00002441188,0.000046000572,0.000008304235,0.0008746416,0.000007105384,0.000088211746,0.00029100123],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023707633,0.000016475238,0.0005395624,0.00009563572,0.00006484353,9.619432e-7,0.003176156,0.029127827,0.032986116,0.37383005,0.009158399,0.55098027],"study_design_scores_gemma":[0.00015307254,0.000010218271,0.00015609284,0.000015877535,0.000009964958,0.000011611797,0.00019262669,0.9569139,0.0108741205,0.02406491,0.0074375984,0.00015998806],"about_ca_topic_score_codex":0.000012296165,"about_ca_topic_score_gemma":0.000003030521,"teacher_disagreement_score":0.9277861,"about_ca_system_score_codex":0.000023669127,"about_ca_system_score_gemma":0.000006177508,"threshold_uncertainty_score":0.9997505},"labels":[],"label_agreement":null},{"id":"W7009710678","doi":"","title":"The facts and fallacies about BIM","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Presentation (obstetrics); Process (computing); Focus (optics); Information model; Information technology; Industry 4.0","score_opus":0.013751482132371044,"score_gpt":0.18457493144804724,"score_spread":0.1708234493156762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7009710678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5775138,0.0004584783,0.0027782926,0.00008339262,0.0005271793,0.000048944778,0.0000014272435,0.0001763356,0.41841212],"genre_scores_gemma":[0.99913055,0.00012913592,0.0004400378,0.000011822963,0.000022539072,0.0000028058043,2.265976e-7,0.0000034573773,0.00025941335],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999849,0.0000030677163,0.000039452916,0.000028436934,0.000027627966,0.000052412648],"domain_scores_gemma":[0.9999133,0.000008331609,0.000004267151,0.00004949232,0.000009495378,0.000015127311],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000020590307,0.000030009285,0.000021988028,0.000009448095,0.000049934995,0.000018423008,0.000026148266,0.000018822448,0.00009725683],"category_scores_gemma":[0.000003951116,0.000019576906,0.0000074897252,0.000021202326,0.000031777538,0.000035809986,0.000003915612,0.000036557933,0.000021712134],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006785279,0.000003694695,0.0034878496,0.000015559608,0.000032727534,9.157692e-7,0.0026235683,0.000008902744,0.018296495,0.37316805,0.0043322295,0.59802324],"study_design_scores_gemma":[0.0005796081,0.00008390669,0.22016592,0.000048068992,0.000034580495,0.000079332516,0.004297501,0.013542969,0.11275818,0.25023457,0.39760214,0.00057323015],"about_ca_topic_score_codex":0.0000037148843,"about_ca_topic_score_gemma":0.000017619313,"teacher_disagreement_score":0.59744996,"about_ca_system_score_codex":0.0000037559914,"about_ca_system_score_gemma":0.0000020767611,"threshold_uncertainty_score":0.106489405},"labels":[],"label_agreement":null},{"id":"W7014885741","doi":"","title":"Research viewpoints by IRC : collaboration is key to advancing construction innovation","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Viewpoints; Key (lock); Industry 4.0; Construction industry; Technology forecasting","score_opus":0.014342521475577318,"score_gpt":0.2804518631942522,"score_spread":0.2661093417186749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014885741","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67183053,0.00013244779,0.11412734,0.0018470252,0.0020775103,0.00063618034,0.000039358176,0.00041561847,0.20889397],"genre_scores_gemma":[0.9784362,0.000047956735,0.02035316,0.0002342435,0.00008728734,0.00008254768,0.000024916875,0.000025287209,0.0007084539],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989754,0.00006305262,0.00026849777,0.00017558226,0.00028988085,0.00022760069],"domain_scores_gemma":[0.999177,0.000025077856,0.000027155063,0.00015620746,0.0005569083,0.00005765616],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043470965,0.000097983895,0.00009516898,0.00031826933,0.00014561074,0.000076642194,0.000055287266,0.000098259174,0.000750078],"category_scores_gemma":[0.00014355333,0.00010886573,0.000014065027,0.001992623,0.000036426904,0.0002989863,0.0000064985156,0.00020817005,0.00019342151],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010009688,0.000011345583,0.0002938427,0.000029891187,0.000014437106,4.0641223e-7,0.0006295082,0.00035536577,0.565927,0.13645321,0.19994393,0.096331],"study_design_scores_gemma":[0.00032180315,0.000058463585,0.00011015558,0.000047302332,0.0000056463014,0.000017414353,0.0018716615,0.0022508695,0.48285693,0.024563447,0.48765966,0.00023665687],"about_ca_topic_score_codex":0.0000040755654,"about_ca_topic_score_gemma":0.0000149807975,"teacher_disagreement_score":0.30660558,"about_ca_system_score_codex":0.00021489627,"about_ca_system_score_gemma":0.000059746057,"threshold_uncertainty_score":0.8212828},"labels":[],"label_agreement":null},{"id":"W7015679255","doi":"","title":"Understanding BIM and value it brings - Invited presentation","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Presentation (obstetrics); Reuse; Value (mathematics); Session (web analytics); Focus (optics); Building information modeling","score_opus":0.07415348846484052,"score_gpt":0.22596490556486426,"score_spread":0.15181141710002374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015679255","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53753316,0.00004157042,0.25129333,0.00050838466,0.00059627066,0.0001485153,0.0000036479862,0.00039040265,0.2094847],"genre_scores_gemma":[0.99779457,0.00001964688,0.0020374518,0.000059722734,0.00002534574,0.000004633092,0.0000022538031,0.000007528533,0.000048852107],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99975246,0.000006341774,0.000069514805,0.000058262565,0.000049203354,0.00006424132],"domain_scores_gemma":[0.9999021,0.0000084598805,0.000009727301,0.000044781977,0.000008873046,0.000026012784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002989608,0.000044825996,0.000037731228,0.00005322323,0.000031902502,0.000018318726,0.000021055224,0.000034420074,0.0001656206],"category_scores_gemma":[0.000004816933,0.000045672237,0.000009912768,0.00006782037,0.000022617793,0.00013328234,0.000005134002,0.00005040314,0.000006306261],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023857907,0.000015920981,0.012302855,0.0000972591,0.00008124638,0.000004043458,0.0059740986,0.00025650347,0.10513219,0.84060943,0.014894059,0.020608552],"study_design_scores_gemma":[0.0015679613,0.00011825295,0.03591711,0.00013443475,0.00009458036,0.0001161752,0.0072440766,0.25500146,0.13135783,0.55745244,0.010185554,0.0008101324],"about_ca_topic_score_codex":0.000013151207,"about_ca_topic_score_gemma":0.000010723838,"teacher_disagreement_score":0.46026137,"about_ca_system_score_codex":0.000030926483,"about_ca_system_score_gemma":0.0000020299856,"threshold_uncertainty_score":0.18624598},"labels":[],"label_agreement":null},{"id":"W7015852235","doi":"","title":"Update on Projects at the Canadian Centre for Housing Technology","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Product (mathematics); Information technology; New product development; Test (biology); Research centre","score_opus":0.006627505477034835,"score_gpt":0.19367116842083584,"score_spread":0.187043662943801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015852235","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9227351,0.000011663322,0.0003167756,0.0097974045,0.0016408946,0.000331299,0.00002513678,0.00027667682,0.06486504],"genre_scores_gemma":[0.9986576,0.000001444502,0.00083636364,0.00010133615,0.000071862414,0.00001935043,0.0000052564665,0.000009356341,0.00029742927],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997489,0.0000018770755,0.0000420475,0.000056406334,0.00002996669,0.000120827084],"domain_scores_gemma":[0.9998335,0.0000070784645,0.000006764394,0.00010548018,0.000021546972,0.000025615369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000026333695,0.000043476106,0.000031021256,0.00006435962,0.00013716798,0.000017252076,0.000050905313,0.000080075144,0.00017538213],"category_scores_gemma":[0.000011661225,0.000031791253,0.000013730288,0.00007193396,0.00003069837,0.000018007107,0.0000035949395,0.00012783037,0.00004728174],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010361693,0.000005664931,0.0016734418,0.000020205889,0.00002963591,0.00000223499,0.00027000037,0.00026862105,0.14723158,0.32115817,0.0640178,0.4653123],"study_design_scores_gemma":[0.00018795431,0.000013457752,0.00021539544,0.000009848583,0.000008739939,0.000016575992,0.00013261038,0.009581691,0.11583243,0.009386811,0.864486,0.00012853339],"about_ca_topic_score_codex":0.0003686325,"about_ca_topic_score_gemma":0.38486508,"teacher_disagreement_score":0.80046815,"about_ca_system_score_codex":0.00005523675,"about_ca_system_score_gemma":0.00003080589,"threshold_uncertainty_score":0.6263595},"labels":[],"label_agreement":null},{"id":"W7020101737","doi":"","title":"Invited Presentation - BIM, what, why and how?","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"","score_opus":0.007134138118664521,"score_gpt":0.20021335041951535,"score_spread":0.19307921230085084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7020101737","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98462564,0.00005550018,0.0055273217,0.003976179,0.0011829173,0.00007142289,0.0000019084257,0.00018327356,0.00437581],"genre_scores_gemma":[0.99789673,0.000059788472,0.0016704134,0.00018886513,0.00010294525,0.0000103749535,0.000006757018,0.00000695115,0.00005717092],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998044,0.0000048296806,0.000037109265,0.00005305664,0.00004746059,0.00005317623],"domain_scores_gemma":[0.9998761,0.000009759501,0.0000072886373,0.00006091561,0.00001908903,0.000026853426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00002391556,0.00004121203,0.000032951717,0.00003988102,0.000023912728,0.000106093335,0.000021941967,0.00004655908,0.00010614151],"category_scores_gemma":[0.000007668354,0.000039219343,0.000008763956,0.000057760517,0.000022650911,0.0003648473,0.000003920024,0.00009714271,0.0000052365735],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000026205876,0.0000036455144,0.00125974,0.00001679494,0.000011245084,5.5767356e-7,0.00021301836,0.000019256295,0.72852993,0.008787259,0.028521469,0.23263444],"study_design_scores_gemma":[0.0011696147,0.000060319377,0.024201123,0.000057145426,0.00004306903,0.00011085373,0.0018390546,0.1465718,0.2999698,0.047253955,0.47810715,0.00061611104],"about_ca_topic_score_codex":0.0000023431476,"about_ca_topic_score_gemma":0.000039957667,"teacher_disagreement_score":0.4495857,"about_ca_system_score_codex":0.0000034547597,"about_ca_system_score_gemma":0.0000013258848,"threshold_uncertainty_score":0.15993184},"labels":[],"label_agreement":null},{"id":"W7024525025","doi":"","title":"RSB 2011-2012 - Modélisation de l'information du bâtiment (BIM)","year":2011,"lang":"fr","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information system; Identification (biology); Set (abstract data type); Field (mathematics); Focus (optics)","score_opus":0.014161291890136214,"score_gpt":0.18867926816691513,"score_spread":0.17451797627677892,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024525025","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03584596,0.00083686446,0.6188363,0.0021659073,0.0055347458,0.00033554193,0.00004024899,0.00029528534,0.3361092],"genre_scores_gemma":[0.96361446,0.00037245188,0.032022994,0.00017145339,0.0005587147,0.0000650001,0.000058717033,0.000024086594,0.0031121008],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991591,0.000037384267,0.0003032718,0.00009304793,0.00014983834,0.00025733886],"domain_scores_gemma":[0.99954444,0.000013376366,0.00007491333,0.00016959607,0.000095300195,0.00010239556],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0001801576,0.00015144503,0.000106220876,0.00010815906,0.00008484164,0.0000509792,0.00008858953,0.00019536614,0.019017572],"category_scores_gemma":[0.000012720571,0.00016982737,0.000066413704,0.000085237945,0.000050636907,0.0015859806,0.000015180265,0.00017298895,0.0031391885],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002931139,0.000053275107,0.0012074434,0.000116690346,0.00007364621,0.0000016998277,0.006260951,0.0019959637,0.0033244523,0.5082591,0.054532487,0.42414498],"study_design_scores_gemma":[0.001139078,0.0001696265,0.019978376,0.0001528418,0.0001894458,0.00016025118,0.0014516634,0.4965884,0.0481537,0.13397291,0.29728213,0.0007615517],"about_ca_topic_score_codex":0.00027525783,"about_ca_topic_score_gemma":0.000026025175,"teacher_disagreement_score":0.9277685,"about_ca_system_score_codex":0.00027982268,"about_ca_system_score_gemma":0.00005304385,"threshold_uncertainty_score":0.997637},"labels":[],"label_agreement":null},{"id":"W7030439585","doi":"","title":"NRC-CCCT in London hosts building information modeling (BIM) experts","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information model; Information system; Key (lock); Information technology; Set (abstract data type)","score_opus":0.005809089103762306,"score_gpt":0.19941148242343099,"score_spread":0.1936023933196687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030439585","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9175918,0.000016886794,0.061654914,0.00005664321,0.00084556296,0.00006949942,0.0000013956634,0.00016881841,0.019594476],"genre_scores_gemma":[0.9940947,0.000014750215,0.0057317973,0.000033828845,0.000082167375,0.000020429967,0.0000053685408,0.000007997177,0.0000089081195],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951667,0.000004592386,0.00017845951,0.000056151133,0.000121825644,0.0001223169],"domain_scores_gemma":[0.999798,0.000008281054,0.000014729953,0.00010061437,0.000047051944,0.000031295716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00009098451,0.00007470984,0.00006559545,0.00013534098,0.000029637022,0.00004590577,0.000058115653,0.00008886719,0.00013999693],"category_scores_gemma":[0.000028225377,0.00007566858,0.00002182789,0.000109381355,0.000008908946,0.00059822155,0.000008111764,0.0001845579,0.000025186035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012175029,0.000009892002,0.0011354114,0.00004068066,0.000009238533,0.0000013416102,0.0013040464,0.06629447,0.46087456,0.037796292,0.0010079795,0.4315139],"study_design_scores_gemma":[0.00021309314,0.000005027942,0.00016181117,0.000021988957,0.0000017525815,0.000011010148,0.00014323858,0.97021306,0.020769278,0.0037857494,0.0045537157,0.00012026489],"about_ca_topic_score_codex":0.000023238816,"about_ca_topic_score_gemma":0.00008785451,"teacher_disagreement_score":0.9039186,"about_ca_system_score_codex":0.000044080505,"about_ca_system_score_gemma":0.000012456082,"threshold_uncertainty_score":0.30856752},"labels":[],"label_agreement":null},{"id":"W7030592696","doi":"","title":"New and improved NRC web site delivers solutions to construction practitioners","year":2004,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Web site; Key (lock); The Internet; Web application","score_opus":0.006706308558977343,"score_gpt":0.19370343503466672,"score_spread":0.1869971264756894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030592696","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44389313,0.000110907815,0.4803314,0.002960178,0.0019229744,0.00039521107,0.00004301501,0.00085387315,0.069489315],"genre_scores_gemma":[0.9345571,0.000064174106,0.06498795,0.00009154933,0.00012221083,0.00001315256,0.00000776004,0.000011821801,0.00014429435],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99957603,0.0000050569174,0.000100634825,0.0001062568,0.000085708096,0.00012633028],"domain_scores_gemma":[0.99973184,0.0000071098334,0.000015591831,0.00007716228,0.00005977299,0.000108553424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003918829,0.000077077166,0.000060353872,0.00008730125,0.00009140279,0.00003853157,0.000025268568,0.000057459754,0.00018608106],"category_scores_gemma":[0.000017362048,0.00008439574,0.000021438385,0.00013908744,0.000028680342,0.00021753482,0.0000087239105,0.000094250245,0.00006984276],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018953864,0.000007842301,0.00013261776,0.000015802461,0.000043159904,0.0000013589663,0.0005138733,0.006416011,0.7324539,0.08484631,0.007921419,0.16762874],"study_design_scores_gemma":[0.012225022,0.00076830556,0.0080617275,0.00041318015,0.0004783769,0.0018775258,0.008603553,0.11598295,0.14655669,0.15095063,0.5506021,0.0034799732],"about_ca_topic_score_codex":0.00006402315,"about_ca_topic_score_gemma":0.00022838761,"teacher_disagreement_score":0.5858972,"about_ca_system_score_codex":0.00013758599,"about_ca_system_score_gemma":0.00006932731,"threshold_uncertainty_score":0.34415582},"labels":[],"label_agreement":null},{"id":"W7038520686","doi":"","title":"IRC web site offers solutions for the construction industry","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Web site; Construction industry; Construction management; Key (lock); Industry 4.0","score_opus":0.016083445250412946,"score_gpt":0.2081804676195565,"score_spread":0.19209702236914356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7038520686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39675394,0.00040805116,0.30724326,0.0020096013,0.008011539,0.0009091343,0.00013108256,0.0009516678,0.28358176],"genre_scores_gemma":[0.99704593,0.000026300013,0.0023877278,0.000046846828,0.000104817445,0.00006825657,0.000004718064,0.000010855837,0.00030454664],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99960786,0.000012114756,0.00010045108,0.00006997908,0.00005977577,0.00014982394],"domain_scores_gemma":[0.99975985,0.000046581226,0.000014957705,0.000110593006,0.000039780178,0.000028233273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008646938,0.000066412336,0.000051581785,0.000035103603,0.00018200619,0.000026792979,0.000039371687,0.0001274172,0.0004111403],"category_scores_gemma":[0.000028827466,0.000053237454,0.00004325005,0.00011089265,0.000063717875,0.00007484875,0.0000031266663,0.00019691257,0.000025505316],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009297713,0.000013019024,0.0018658241,0.000030459734,0.00010377632,3.361661e-7,0.00020792882,0.0065698144,0.08702777,0.7684863,0.04215625,0.09352921],"study_design_scores_gemma":[0.0012908652,0.000052571268,0.0017377804,0.000039073173,0.00014399696,0.00019943151,0.0023565511,0.18136886,0.027359867,0.043487124,0.741445,0.0005188867],"about_ca_topic_score_codex":0.0000014731116,"about_ca_topic_score_gemma":0.000013764619,"teacher_disagreement_score":0.7249992,"about_ca_system_score_codex":0.000037865797,"about_ca_system_score_gemma":0.00002865261,"threshold_uncertainty_score":0.45016977},"labels":[],"label_agreement":null},{"id":"W7042431196","doi":"","title":"An Ontological Study on the State of the Turkish Construction Industry and its Implementation of Building Information Modeling (BIM)","year":2020,"lang":"en","type":"dissertation","venue":"Eastern Mediterranean University Institutional Repository (Eastern Mediterranean University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Turkish; Building information modeling; Construction industry; Work (physics); State (computer science); Information technology","score_opus":0.024331747341255844,"score_gpt":0.22913726858753952,"score_spread":0.20480552124628368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7042431196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99176574,0.00003502601,0.0021920751,0.000057159046,0.0027640287,0.0007933995,0.00014275366,0.000100557576,0.002149284],"genre_scores_gemma":[0.9992784,0.0000221764,0.00005020247,0.000020199293,0.00021097872,0.0000014763757,0.00019783822,0.000018050443,0.0002006349],"study_design_codex":"qualitative","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99766123,0.00031158226,0.0005851825,0.00036327573,0.00085137703,0.00022734124],"domain_scores_gemma":[0.99850595,0.00006272073,0.0005318271,0.00032949963,0.0003934978,0.00017652083],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00017585578,0.00040758192,0.00041508526,0.00052896916,0.00053233275,0.00006601636,0.00065754214,0.00038726095,0.000033080923],"category_scores_gemma":[0.000026987931,0.00035402927,0.0001646551,0.00050569716,0.00026499046,0.0012010726,0.000074560485,0.0010541162,0.0000030748533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.011746619,0.0016106892,0.051556114,0.0057440954,0.0068539972,0.0011006839,0.28655785,0.2474298,0.047991056,0.0583419,0.0003313024,0.28073588],"study_design_scores_gemma":[0.006838012,0.0015978222,0.02373986,0.002126155,0.0015730001,0.00029300316,0.37247062,0.5719423,0.014636279,0.0002767624,0.0026599395,0.0018462043],"about_ca_topic_score_codex":0.00013490183,"about_ca_topic_score_gemma":0.00018693565,"teacher_disagreement_score":0.32451254,"about_ca_system_score_codex":0.00027987364,"about_ca_system_score_gemma":0.00027528589,"threshold_uncertainty_score":0.99989116},"labels":[],"label_agreement":null},{"id":"W7071148070","doi":"","title":"Season 11 Episode 02 - Pow Wow Circle","year":2002,"lang":"en","type":"other","venue":"Connecting Canadians: Canada’s Multicultural Newspapers Beta Website (Athabasca University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Popularity; Phenomenon","score_opus":0.005800524517996833,"score_gpt":0.15706613841510186,"score_spread":0.15126561389710502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7071148070","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009652452,0.002401866,0.00010238174,0.0018053425,0.0045512198,0.00097087066,0.0015383344,0.0017208987,0.97725666],"genre_scores_gemma":[0.13975868,0.0003227977,0.0005374694,0.0003116222,0.000710608,0.000004736011,0.00041277186,0.0005547094,0.8573866],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99742454,0.00009139952,0.00033523145,0.00076805387,0.00045037575,0.0009303813],"domain_scores_gemma":[0.99819624,0.000091470276,0.00022048398,0.0005411686,0.00014735915,0.00080330094],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.000053936434,0.00076505943,0.0007137365,0.000650002,0.0004242904,0.00014806914,0.0006236993,0.0006144054,0.004661462],"category_scores_gemma":[0.000059676593,0.0009004702,0.00029465204,0.00072092336,0.00010657668,0.00029894893,0.000049873615,0.0006852622,0.00009249746],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055797254,0.000011225534,0.0005929762,0.00022786057,0.00047530505,0.00039902743,0.000425586,0.00093667797,0.00015498456,0.00023347944,0.9904854,0.006051887],"study_design_scores_gemma":[0.00071045914,0.000013585661,0.00043922066,0.0003914911,0.00022616952,0.000053048818,0.0037950722,0.0016229796,0.00009174861,5.235019e-7,0.9914776,0.0011781092],"about_ca_topic_score_codex":0.93480814,"about_ca_topic_score_gemma":0.9991983,"teacher_disagreement_score":0.13010623,"about_ca_system_score_codex":0.0027938746,"about_ca_system_score_gemma":0.00055369263,"threshold_uncertainty_score":0.9993446},"labels":[],"label_agreement":null},{"id":"W7082632266","doi":"10.1109/comst.2025.3612388","title":"Integrated Sensing, Communication, and Computation for IoV: Challenges and Opportunities","year":2025,"lang":"en","type":"article","venue":"IEEE Communications Surveys & Tutorials","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Science and Technology Innovation Foundation of Harbin; National Natural Science Foundation of China","keywords":"Bottleneck; Redundancy (engineering); Computation; Resource (disambiguation); System integration; Data integration; Service (business); Automation","score_opus":0.10264569411492841,"score_gpt":0.3048827889188718,"score_spread":0.20223709480394342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7082632266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09432916,0.19423096,0.6304757,0.014432964,0.00772173,0.0030743757,0.0004345133,0.0024403718,0.052860215],"genre_scores_gemma":[0.9441248,0.043308545,0.011820626,0.000059128928,0.000064476546,0.000098866,0.00021962069,0.000023477049,0.0002804181],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986258,0.00064993306,0.00039531244,0.00014139921,0.00006538277,0.00012213406],"domain_scores_gemma":[0.9976714,0.0010954158,0.00007428501,0.00070788566,0.00040700784,0.00004400078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013481998,0.0001570117,0.00023959808,0.000187685,0.00033453258,0.00010841436,0.00023071212,0.00013002375,0.000002641025],"category_scores_gemma":[0.00012725218,0.0001678739,0.00003139469,0.00011948469,0.00032143627,0.00020716489,0.000061085186,0.00015209941,0.0000013599326],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008423294,0.000025002222,0.00005549905,0.00011034157,0.00014249959,8.5109725e-8,0.0012675781,0.00012432324,0.0013419616,0.13636687,0.003911731,0.8566457],"study_design_scores_gemma":[0.0025332253,0.00010143205,0.009334923,0.0007394698,0.00030392176,0.00003398971,0.008310465,0.14488849,0.0033097072,0.089799605,0.7395281,0.0011166325],"about_ca_topic_score_codex":0.00008592955,"about_ca_topic_score_gemma":0.0006044577,"teacher_disagreement_score":0.85552907,"about_ca_system_score_codex":0.00005360092,"about_ca_system_score_gemma":0.00005863519,"threshold_uncertainty_score":0.6845699},"labels":[],"label_agreement":null},{"id":"W7093306288","doi":"10.1016/j.autcon.2025.106618","title":"Integrated framework of computer vision and fuzzy systems for lean workspace management in construction","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workspace; Dashboard; Workflow; Fuzzy logic; Index (typography); Fuzzy control system; Workflow management system; Inference engine","score_opus":0.005108952100332462,"score_gpt":0.23166076692432028,"score_spread":0.2265518148239878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093306288","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35642081,0.00031619644,0.63785654,0.000077239725,0.0028604295,0.00069240585,0.000008200819,0.00021786446,0.001550315],"genre_scores_gemma":[0.8982276,0.00023510083,0.10130059,0.000010934631,0.000041683892,0.000120268945,0.000027522407,0.000012186596,0.000024138859],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989322,0.000041501764,0.00056513585,0.00021454458,0.000105217805,0.00014141649],"domain_scores_gemma":[0.9995251,0.0001105755,0.00010507404,0.00014303856,0.00009447454,0.000021715732],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020409154,0.00015604985,0.0002370611,0.0007595415,0.00004715035,0.000056679684,0.000056624653,0.00021358115,0.000006999341],"category_scores_gemma":[0.000019612247,0.00016494037,0.000035248864,0.00074506056,0.00011733804,0.0002706687,0.00001514381,0.00017750484,0.0000013875451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049685405,0.000017785076,0.008590769,0.0004891671,0.00005141975,6.174441e-7,0.00017480862,0.031410217,0.00025577814,0.45065755,0.00025645155,0.50804573],"study_design_scores_gemma":[0.0015204204,0.00005844386,0.025494674,0.0018676608,0.000040681858,0.00004692884,0.003126717,0.925625,0.0006317106,0.040311698,0.0009974735,0.00027854825],"about_ca_topic_score_codex":0.000042867116,"about_ca_topic_score_gemma":0.00003947517,"teacher_disagreement_score":0.8942148,"about_ca_system_score_codex":0.00017385608,"about_ca_system_score_gemma":0.000019997162,"threshold_uncertainty_score":0.6726073},"labels":[],"label_agreement":null},{"id":"W7094360872","doi":"","title":"Patientsâ experiences with continuity of cancer care in Canada: Results from the CanIMPACT study","year":2016,"lang":"en","type":"article","venue":"PubMed Central","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nucleofection; Gestational period; TSG101; Dysgeusia; Liquation; Diafiltration; Emperipolesis; Triacetin; Durvalumab","score_opus":0.006504209827282767,"score_gpt":0.18279159265507047,"score_spread":0.17628738282778772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7094360872","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9984772,0.00019242342,0.000011514786,0.000037122318,0.0005683524,0.0002348074,0.00021552679,0.000012324688,0.00025071067],"genre_scores_gemma":[0.9997679,0.0000097782895,0.0000030506478,0.0000061931864,0.000053010775,0.00014648915,0.0000029045493,0.0000044183967,0.0000062624526],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993253,0.000021019097,0.000147751,0.00008650458,0.00013897929,0.00028045868],"domain_scores_gemma":[0.99975026,0.00003447617,0.000032963115,0.000097836746,0.000025304933,0.000059167636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00003400882,0.000064874024,0.00008288156,0.000010620718,0.000016483353,0.000007097887,0.00007982865,0.000014003333,0.000025038795],"category_scores_gemma":[0.000020237323,0.000031724296,0.000009341644,0.00007479263,0.000025664533,0.00006191716,0.0000049208165,0.00004422858,1.0145317e-7],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000068746434,0.000005943038,0.9076447,0.0000012598969,0.000020272311,0.0000010984312,0.024667103,0.00016349198,0.0000137113575,0.000005210712,0.00013076628,0.067277715],"study_design_scores_gemma":[0.00070439983,0.000013962842,0.9250429,0.000017754342,0.000006051403,1.3559007e-7,0.07228523,0.000024205021,0.0016665822,0.0000010601398,0.00018591473,0.000051800722],"about_ca_topic_score_codex":0.8996118,"about_ca_topic_score_gemma":0.9968128,"teacher_disagreement_score":0.09720105,"about_ca_system_score_codex":0.0006185583,"about_ca_system_score_gemma":0.00029878784,"threshold_uncertainty_score":0.16175085},"labels":[],"label_agreement":null},{"id":"W7097405481","doi":"","title":"EDITOR: B.C. Björk","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Compendium; Software; Cover (algebra); Workflow; Information technology","score_opus":0.003970820071504896,"score_gpt":0.1782684283510865,"score_spread":0.1742976082795816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097405481","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068618604,0.0000898163,0.044147287,0.00001689623,0.011258071,0.000022773664,4.1550166e-7,0.00042528118,0.9371776],"genre_scores_gemma":[0.9955566,0.000007681577,0.0016934373,0.000027118997,0.0007973141,0.000003982191,5.4231646e-7,0.000005344339,0.0019080028],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998726,0.0000022256845,0.00003486622,0.000023957564,0.000026800317,0.00003951909],"domain_scores_gemma":[0.99993503,0.0000030148772,0.0000015752806,0.00003890473,0.000007659152,0.000013815886],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000012895732,0.000024251409,0.000018771498,0.000012598163,0.000010345827,0.000007304487,0.000011617184,0.000021164384,0.00079076854],"category_scores_gemma":[0.0000031399074,0.000020955811,0.0000097586035,0.000032220236,0.000004394719,0.00003678181,4.432545e-7,0.000026907883,0.00017523419],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.3660842e-7,0.000003540786,0.0006056165,0.0000054372044,0.000009872912,2.6190995e-7,0.00003299114,0.0005320834,0.0028791286,0.4119077,0.5629825,0.021040536],"study_design_scores_gemma":[0.00004584056,0.0000026477426,0.00009264341,9.890244e-7,0.0000012167669,0.000004655858,0.00005105609,0.0011325072,0.01520533,0.001475679,0.9819399,0.000047533675],"about_ca_topic_score_codex":0.0000010924501,"about_ca_topic_score_gemma":0.0000037273367,"teacher_disagreement_score":0.9886947,"about_ca_system_score_codex":0.0000075605294,"about_ca_system_score_gemma":0.000002529925,"threshold_uncertainty_score":0.86583614},"labels":[],"label_agreement":null},{"id":"W7098362078","doi":"","title":"Post-secondary Education: Evidence for Canadian 24- to 26-year-olds","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interpretation (philosophy); Social research; Official statistics; Data collection; Center (category theory); Survey data collection","score_opus":0.03151580373683241,"score_gpt":0.2624794121165526,"score_spread":0.23096360837972021,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7098362078","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2742701,0.003444876,0.05246937,0.022628054,0.02640226,0.002192837,0.00013044586,0.0017224565,0.61673963],"genre_scores_gemma":[0.9805179,0.000005641451,0.008645194,0.001378364,0.00035737528,0.0001145806,0.000010716635,0.00002001704,0.008950196],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996619,0.0000036559782,0.00008771996,0.000080041435,0.00005124358,0.00011541403],"domain_scores_gemma":[0.99942243,0.000014680456,0.000005247352,0.000109397,0.00018294345,0.00026532108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000057575304,0.00005710228,0.00004729499,0.000091610695,0.000032718097,0.000040226267,0.00006646618,0.000045579338,0.00043897927],"category_scores_gemma":[0.00005580165,0.000056358705,0.000020090629,0.00008936025,0.0000066515086,0.00017623288,0.000003299616,0.000046303958,0.00030313042],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014587502,0.00000629474,0.001591888,0.000040324376,0.000016676493,3.1027383e-7,0.0007445411,0.0003692745,0.0008099216,0.037289184,0.7150439,0.2440731],"study_design_scores_gemma":[0.00019200615,0.00008841735,0.0042721187,0.000047116624,0.000010798404,0.000021165617,0.0022850446,0.0014204308,0.0030561334,0.0014159196,0.98692447,0.00026639234],"about_ca_topic_score_codex":0.01678231,"about_ca_topic_score_gemma":0.13143392,"teacher_disagreement_score":0.7062478,"about_ca_system_score_codex":0.00014670155,"about_ca_system_score_gemma":0.00077334634,"threshold_uncertainty_score":0.98976505},"labels":[],"label_agreement":null},{"id":"W7099378011","doi":"","title":"Multi-Level Effects on Behaviour Outcomes in Canadian Children W-01-2E","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Affect (linguistics); Data collection; Perspective (graphical)","score_opus":0.011168834130534667,"score_gpt":0.22004568435033398,"score_spread":0.20887685021979932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099378011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99267614,0.000022650036,0.00050167023,0.00012557453,0.00036257296,0.00013272873,0.000008607901,0.00012555873,0.006044509],"genre_scores_gemma":[0.99820775,0.0000073189685,0.0006609973,0.00013838554,0.000027549595,0.00001644796,0.000010878202,0.000012027923,0.0009186716],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995744,0.0000075070684,0.000093414346,0.00008453968,0.000052466952,0.00018764652],"domain_scores_gemma":[0.9997842,0.0000119781225,0.000005374861,0.000092860086,0.000007628766,0.0000979625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000028982917,0.00008997879,0.00008245257,0.00016480833,0.0000250453,0.000017274473,0.000050583923,0.00007131146,0.00016260182],"category_scores_gemma":[0.0000091564925,0.00007926343,0.000026270864,0.0000965005,0.0000058653254,0.000055864602,0.0000023672278,0.000109936285,0.00012267864],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[7.879671e-7,0.000008561059,0.9693743,0.0000016607295,0.00000930707,0.0000054141137,0.00002907583,0.0002658327,0.00007601679,0.0005142761,0.0003068154,0.02940797],"study_design_scores_gemma":[0.0003090317,0.000009962317,0.99643326,0.000008948236,0.0000036360113,0.000009203103,0.000010845627,0.0019693347,0.00088988483,0.000012700567,0.00024218233,0.00010099929],"about_ca_topic_score_codex":0.15245275,"about_ca_topic_score_gemma":0.7104383,"teacher_disagreement_score":0.55798554,"about_ca_system_score_codex":0.00012269676,"about_ca_system_score_gemma":0.00001813431,"threshold_uncertainty_score":0.85319114},"labels":[],"label_agreement":null},{"id":"W7100314761","doi":"","title":"Kensington","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Energy cost; Work (physics); Quarter (Canadian coin)","score_opus":0.004795248148528905,"score_gpt":0.1782562215656699,"score_spread":0.17346097341714098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100314761","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1573899,0.00007963112,0.03531178,0.00022613708,0.00031622886,0.000017186592,2.0833352e-7,0.0005851234,0.8060738],"genre_scores_gemma":[0.995432,0.0000045839233,0.0031854147,0.00005331206,0.00008862528,5.390498e-7,4.1301337e-7,0.000002477831,0.0012326048],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99991125,5.861538e-7,0.00002747092,0.000016534814,0.000016399204,0.000027774471],"domain_scores_gemma":[0.99995834,0.0000012818223,0.00000106471,0.000025919337,0.0000049712203,0.000008420156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000005861816,0.000016770224,0.000013080535,0.000011259994,0.000006998156,0.0000057970233,0.000008572787,0.000012186581,0.0004556363],"category_scores_gemma":[5.0399365e-7,0.000014563276,0.0000066434654,0.000019994099,0.0000030967844,0.00004148046,6.767843e-7,0.000018022349,0.0002430779],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[3.4948306e-7,0.0000015740536,0.00014322672,0.0000015410251,0.0000037508776,7.475232e-8,0.0000378478,0.0027748866,0.0059228996,0.039651357,0.020732,0.93073046],"study_design_scores_gemma":[0.0000791776,0.0000034231352,0.0007999477,0.0000023077039,0.00000192434,0.000012100066,0.000035608155,0.13164349,0.07081062,0.00043987003,0.7960919,0.00007961223],"about_ca_topic_score_codex":0.0000010366357,"about_ca_topic_score_gemma":0.000013366729,"teacher_disagreement_score":0.9306509,"about_ca_system_score_codex":0.000008018607,"about_ca_system_score_gemma":8.434033e-7,"threshold_uncertainty_score":0.4988898},"labels":[],"label_agreement":null},{"id":"W7104272419","doi":"10.71781/1648","title":"Les incidences juridiques du bâti immobilier modélisé au Québec","year":2022,"lang":"fr","type":"dissertation","venue":"Papyrus : Institutional Repository (Université de Montréal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Economic liberalism; Local government","score_opus":0.00510672063061931,"score_gpt":0.17384884268795053,"score_spread":0.16874212205733122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7104272419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8944493,0.025645906,0.00082589133,0.00073577865,0.004642772,0.0003740715,0.00010619009,0.00034058045,0.0728795],"genre_scores_gemma":[0.9541496,0.0011097919,0.0006125024,0.00003977996,0.0004956481,0.000114009665,0.0005172998,0.000058273148,0.042903095],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973772,0.00018569121,0.00058855634,0.00064067537,0.00073216396,0.0004756941],"domain_scores_gemma":[0.9985436,0.00014411044,0.00034751388,0.00037083088,0.00031615925,0.0002777708],"candidate_categories":["metaepi_narrow","sts","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00019381524,0.00059533597,0.00046473483,0.0004278678,0.010756247,0.000095551986,0.00049688754,0.0005595824,0.001101168],"category_scores_gemma":[0.00005671683,0.00072155695,0.0004441279,0.0004146869,0.00034106747,0.0006775566,0.0001397368,0.00084672676,0.00008604965],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.0011340014,0.0004152046,0.1840059,0.00086412317,0.0016246391,0.0021164543,0.24143916,0.12270344,0.022106767,0.30237225,0.002990721,0.11822735],"study_design_scores_gemma":[0.0013614328,0.00031086124,0.19625954,0.0005788251,0.0010433991,0.002865872,0.22150853,0.022498585,0.019596267,0.001115669,0.53064436,0.0022166693],"about_ca_topic_score_codex":0.84305847,"about_ca_topic_score_gemma":0.64275646,"teacher_disagreement_score":0.52765363,"about_ca_system_score_codex":0.025347289,"about_ca_system_score_gemma":0.006255134,"threshold_uncertainty_score":0.99981195},"labels":[],"label_agreement":null},{"id":"W7105799012","doi":"10.1007/978-3-031-97697-1_13","title":"BIM-Based Configuration System for an Early Design Stage of Modular Residential Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Modular design; Workflow; Product (mathematics); Configuration design; Configuration Management (ITSM); Production (economics); Systems design","score_opus":0.015194841797909876,"score_gpt":0.209051260524775,"score_spread":0.19385641872686513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105799012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00030051917,0.00046900118,0.9926602,0.0000058392015,0.000999262,0.00089931703,0.00008381238,0.0003819888,0.0042000604],"genre_scores_gemma":[0.9841909,0.000014097381,0.0140579585,0.0000067603423,0.0002548363,0.00016833909,0.00012501053,0.00012869578,0.0010534333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882734,0.000013767521,0.00047570927,0.00028420164,0.00019159507,0.00020740583],"domain_scores_gemma":[0.9992559,0.000186172,0.000094159506,0.00029824054,0.00012580754,0.000039731192],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014870486,0.00036307322,0.00041665064,0.00059116347,0.000028585297,0.000048274393,0.00014352579,0.0005489208,0.00002461702],"category_scores_gemma":[0.00006333632,0.00040258502,0.00011874642,0.00010202332,0.000018908288,0.00011570763,0.0000073071715,0.00036698778,0.000001206006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033715623,0.0000034265142,0.000003931089,0.0020158074,0.000061729086,0.0000029938262,0.0000680382,0.95614994,0.014636567,0.023475233,0.000014392417,0.0035342122],"study_design_scores_gemma":[0.0005229959,0.00012570474,0.000014860678,0.001559087,0.00006971006,0.0000024312449,0.0000045521974,0.89190245,0.10370182,0.00063942646,0.0010072694,0.00044968646],"about_ca_topic_score_codex":0.000033692108,"about_ca_topic_score_gemma":0.00025232905,"teacher_disagreement_score":0.98389035,"about_ca_system_score_codex":0.00022506114,"about_ca_system_score_gemma":0.0001030672,"threshold_uncertainty_score":0.9998426},"labels":[],"label_agreement":null},{"id":"W7105799806","doi":"10.1007/978-3-031-97697-1_26","title":"Implementing AI to Improve the Efficiency of BIM-Based Construction Schedules","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Schedule; Process (computing); Scheduling (production processes); Building information modeling; Construction management; Project management; System integration","score_opus":0.0042958304751216725,"score_gpt":0.20104121006036377,"score_spread":0.1967453795852421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105799806","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00059633347,0.00092806143,0.98313725,0.0001602507,0.0016014788,0.0004061129,0.0000493797,0.00024436647,0.01287678],"genre_scores_gemma":[0.9856086,0.000044867793,0.013451302,0.00013161516,0.0003449123,0.00007280617,0.00003547972,0.00010357417,0.00020689398],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987275,0.0000063552498,0.0004904921,0.00025997177,0.0001988688,0.00031680803],"domain_scores_gemma":[0.9992685,0.0002042494,0.00007236604,0.0003287592,0.000088243985,0.000037918493],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001675578,0.00035429414,0.00033318225,0.000518491,0.00005377598,0.000038954182,0.0002008465,0.0003090516,0.000115209645],"category_scores_gemma":[0.00011408724,0.00031288352,0.00013319985,0.00021972328,0.000042549527,0.00004734123,0.000043651933,0.0006869016,0.000004030585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007591113,0.000004226161,0.00006678209,0.000568208,0.000082668244,0.000001699025,0.00007915395,0.78366727,0.007844485,0.10762301,0.00002920768,0.10002568],"study_design_scores_gemma":[0.00082952593,0.00011175982,0.00006590124,0.0028913193,0.00019698453,0.000017795297,0.00002379608,0.76200426,0.17158107,0.013328641,0.047530852,0.0014181118],"about_ca_topic_score_codex":0.000016124486,"about_ca_topic_score_gemma":0.000381395,"teacher_disagreement_score":0.98501223,"about_ca_system_score_codex":0.00015239582,"about_ca_system_score_gemma":0.00006928297,"threshold_uncertainty_score":0.99993235},"labels":[],"label_agreement":null},{"id":"W7105800120","doi":"10.1007/978-3-031-97697-1_31","title":"A Maturity Model Defining the Synergy Between Digital Twin and Lean Construction to Support Construction Progress Monitoring","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Lean construction; Maturity (psychological); Construction industry; Construction management; Capability Maturity Model; Industry 4.0; Lean manufacturing; Bridging (networking)","score_opus":0.007289441501217325,"score_gpt":0.20449020625288655,"score_spread":0.19720076475166923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105800120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015729435,0.0044611474,0.92634714,0.0002915061,0.004807674,0.0011979926,0.0004047337,0.0018309715,0.044929378],"genre_scores_gemma":[0.9892637,0.00012629088,0.009510852,0.000014859471,0.0004959614,0.00005950681,0.00007729205,0.00011196055,0.0003395503],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99849695,0.0000051181196,0.00049269333,0.0004122174,0.00024441676,0.0003486178],"domain_scores_gemma":[0.99929667,0.00017464384,0.00007373592,0.00029281902,0.00006608679,0.000096032614],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009162539,0.00052852725,0.00046138227,0.00047248765,0.00009501477,0.00021076053,0.00017013698,0.00055515376,0.000015993986],"category_scores_gemma":[0.00007098924,0.00050322374,0.000102585385,0.00017136094,0.000108026645,0.00021136142,0.00007986657,0.0010816874,0.0000050340846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000128933525,0.0000028005752,0.0023158197,0.00036331272,0.00018208394,0.0000079679185,0.00034582368,0.46071085,0.00010871628,0.045647975,0.000046201236,0.49025556],"study_design_scores_gemma":[0.0021609885,0.00033106274,0.0018436344,0.0102447355,0.0008692519,0.0011287843,0.00016474475,0.8329632,0.011382202,0.102438,0.029996991,0.0064763464],"about_ca_topic_score_codex":0.0000061310075,"about_ca_topic_score_gemma":0.000049036837,"teacher_disagreement_score":0.9735343,"about_ca_system_score_codex":0.0002476059,"about_ca_system_score_gemma":0.0000577248,"threshold_uncertainty_score":0.9997419},"labels":[],"label_agreement":null},{"id":"W7105802331","doi":"10.1007/978-3-031-97697-1","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 3","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004611982156835499,"score_gpt":0.1755872255404775,"score_spread":0.170975243383642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105802331","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001745256,0.010582109,0.7017592,0.0012662336,0.024547871,0.0060411375,0.0029991108,0.0022033025,0.24885575],"genre_scores_gemma":[0.943153,0.00019774551,0.0075506656,0.00016106515,0.0015040871,0.0005277414,0.0001428327,0.0003769636,0.046385854],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998461,0.0000019638665,0.00046704648,0.00033420252,0.00023435644,0.0005014085],"domain_scores_gemma":[0.9992139,0.00012746033,0.00007686988,0.00021722514,0.00026445003,0.00010009057],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014505029,0.00050543895,0.000494502,0.00035584747,0.00007355165,0.00008359606,0.0004185102,0.0008503544,0.00009604099],"category_scores_gemma":[0.00018542317,0.0004899396,0.00038060918,0.00040934497,0.000045836303,0.00012902397,0.000046087713,0.0011676487,0.0000016156824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057768643,0.000007531633,0.00021653561,0.004255918,0.0003906032,0.0000013025698,0.0018343847,0.93234754,0.0013233629,0.008705426,0.045291398,0.0056202393],"study_design_scores_gemma":[0.00042140327,0.000030406229,0.00025286013,0.0027436009,0.00015235505,0.000017339591,0.000027486352,0.6917094,0.0024490608,0.0018827281,0.29931575,0.0009976291],"about_ca_topic_score_codex":0.00062965637,"about_ca_topic_score_gemma":0.08651721,"teacher_disagreement_score":0.9414078,"about_ca_system_score_codex":0.0009796432,"about_ca_system_score_gemma":0.00057551946,"threshold_uncertainty_score":0.9997552},"labels":[],"label_agreement":null},{"id":"W7105803252","doi":"10.1007/978-3-031-97697-1_7","title":"Vision-Aided Decision Support Pipeline for Construction-Specific Data Collection Chamber Design","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Pipeline (software); Viewpoints; Excavator; Rendering (computer graphics); Economic shortage; Data collection; Decision support system","score_opus":0.019154214090177837,"score_gpt":0.23569529613499038,"score_spread":0.21654108204481254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105803252","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000004780426,0.0015686251,0.97981125,0.00006026843,0.0046964027,0.0008516771,0.00016834463,0.0005400777,0.01229857],"genre_scores_gemma":[0.058068626,0.009113238,0.89460385,0.00025697515,0.0051659234,0.0007167384,0.005353941,0.0012687505,0.025451984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978603,0.000010214605,0.0007821115,0.000690956,0.00028887825,0.00036755478],"domain_scores_gemma":[0.99791723,0.0008889409,0.00009927414,0.0008513978,0.00016214512,0.0000809854],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00029798562,0.00062293164,0.0006017583,0.00085985544,0.000096468015,0.00010057693,0.0003104835,0.00087160035,0.00053478556],"category_scores_gemma":[0.00021542089,0.0006760292,0.00012755465,0.00027421062,0.00004720677,0.00023601181,0.00008224451,0.0008049126,0.000021470547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009590473,0.000011071149,0.000005021967,0.00033338412,0.00011493328,0.000012702682,0.00006274002,0.5295896,0.0010681304,0.0060587237,0.027107969,0.4355398],"study_design_scores_gemma":[0.00074370106,0.000055702014,0.0000070328715,0.0008604116,0.00007204361,0.00010743884,0.0000020169487,0.66466165,0.0022596181,0.007638417,0.32284555,0.00074644084],"about_ca_topic_score_codex":0.000004813229,"about_ca_topic_score_gemma":0.00024529843,"teacher_disagreement_score":0.43479335,"about_ca_system_score_codex":0.00038079932,"about_ca_system_score_gemma":0.00011345021,"threshold_uncertainty_score":0.9995691},"labels":[],"label_agreement":null},{"id":"W7105804095","doi":"10.1007/978-3-031-97697-1_14","title":"BIM-AI-VR Integration for Real-Time Model Update and Visualization","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Visualization; Python (programming language); Engineering design process; User interface; Building information modeling; Virtual reality; Software; Process (computing); Rendering (computer graphics)","score_opus":0.005936995140064424,"score_gpt":0.2129952994260415,"score_spread":0.20705830428597707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105804095","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00004615521,0.00085069775,0.98462045,0.00005624733,0.00048630542,0.00037783702,0.000063940664,0.0004715014,0.013026852],"genre_scores_gemma":[0.8495197,0.012450827,0.10895949,0.0007387196,0.0023950192,0.0009212926,0.0042708665,0.001380885,0.019363172],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900544,0.0000038377393,0.00037024965,0.0002994778,0.000117788775,0.00020319338],"domain_scores_gemma":[0.9995294,0.00010744921,0.000047722773,0.00018955187,0.00008321253,0.000042656877],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00008500637,0.00039816438,0.00034920772,0.00050771394,0.00003770885,0.00006936539,0.00008565527,0.0005653715,0.00004677252],"category_scores_gemma":[0.000065923494,0.00042968485,0.00008304841,0.00009692463,0.000018742972,0.0001421998,0.00001956016,0.00038440526,0.0000042719294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009785967,0.000002357735,0.0000022170725,0.00032793044,0.00004901491,7.9114517e-7,0.00008014898,0.762887,0.0028785227,0.17422108,0.00021844603,0.059322685],"study_design_scores_gemma":[0.00018547439,0.0000146378225,0.0000026683576,0.0005135996,0.000048379785,0.00000456864,6.5400246e-7,0.9613809,0.001959501,0.030823866,0.0046967757,0.00036896145],"about_ca_topic_score_codex":0.000005587469,"about_ca_topic_score_gemma":0.00021473787,"teacher_disagreement_score":0.87566096,"about_ca_system_score_codex":0.0001795655,"about_ca_system_score_gemma":0.000035680863,"threshold_uncertainty_score":0.9998155},"labels":[],"label_agreement":null},{"id":"W7106318135","doi":"10.1007/978-3-032-01078-0_5","title":"In-Plane Strength of a New Self-aligning Bolted Connection for Precast Concrete Wall Panels","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Connection (principal bundle); Frame (networking); Insert (composites); Bar (unit); Modular design; Bolted joint","score_opus":0.008007098755650411,"score_gpt":0.20064408707640363,"score_spread":0.1926369883207532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7106318135","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002831447,0.005149582,0.94343007,0.00015201274,0.0051089483,0.0019858256,0.00023072827,0.0013295879,0.039781794],"genre_scores_gemma":[0.97704947,0.0005461004,0.017054208,0.00006874157,0.00084741466,0.00012768703,0.0002935084,0.00025692102,0.0037559618],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99872863,0.000005947783,0.0005592939,0.00029679178,0.00013688115,0.0002724273],"domain_scores_gemma":[0.99921817,0.00036786767,0.00009237982,0.000210171,0.000058875776,0.000052545372],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00009570835,0.0004191167,0.0005475995,0.00060406706,0.000016762191,0.000024308421,0.00012597359,0.0006089861,0.0000944854],"category_scores_gemma":[0.00010039693,0.00048015168,0.0001223687,0.00014753519,0.000011772051,0.000097067634,0.000016679534,0.0006050366,0.0000018595497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011213208,0.000009492212,0.00008130935,0.0039846087,0.0006460305,0.000022650554,0.00209912,0.877837,0.01793826,0.033122662,0.0008630758,0.063283674],"study_design_scores_gemma":[0.0029262602,0.00021008682,0.00007535862,0.0056741615,0.0002846045,0.00007356767,0.000014778044,0.8174055,0.07325201,0.008910229,0.0893228,0.0018506263],"about_ca_topic_score_codex":0.00006680677,"about_ca_topic_score_gemma":0.00053211517,"teacher_disagreement_score":0.974218,"about_ca_system_score_codex":0.0002453351,"about_ca_system_score_gemma":0.00007560908,"threshold_uncertainty_score":0.99976504},"labels":[],"label_agreement":null},{"id":"W7107968898","doi":"10.17638/03194868","title":"Can Light Gauge Steel Frame MMC Homes act as a catalyst for the UK to reach Net-Zero?","year":2025,"lang":"","type":"article","venue":"University of Liverpool","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Carbon footprint; Greenhouse gas; Modular design; Climate change; Frame (networking); Economic shortage; Retrofitting; Resilience (materials science); Service (business)","score_opus":0.005357464763489815,"score_gpt":0.18787527270712268,"score_spread":0.18251780794363287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7107968898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7472193,0.0038563914,0.15365413,0.015071104,0.0053853584,0.0043877573,0.0012441998,0.00039145295,0.068790264],"genre_scores_gemma":[0.98232615,0.00029438414,0.0007720565,0.00012654948,0.00006803591,0.0000022470313,0.000025372594,0.00001404133,0.01637114],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989147,0.000039234434,0.00022173216,0.00032627388,0.000195539,0.00030249887],"domain_scores_gemma":[0.9988282,0.00022249113,0.0001028964,0.00047277551,0.0002516836,0.0001219545],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0001256067,0.00025032883,0.0003268737,0.00030986842,0.00045276232,0.000055328255,0.00053043215,0.00024589282,0.00051547866],"category_scores_gemma":[0.000053242784,0.00025802388,0.00025714267,0.0005219677,0.00012996541,0.0001509055,0.00012535362,0.0002803106,0.000059438025],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002718318,0.00044511587,0.016619263,0.001991842,0.006444181,0.000059813035,0.051010657,0.006148984,0.04337517,0.5213683,0.18787882,0.16193949],"study_design_scores_gemma":[0.004750631,0.0008746661,0.046704903,0.0015940997,0.0029918533,0.000030634903,0.056032263,0.014034339,0.02544927,0.0031384048,0.8427674,0.0016315073],"about_ca_topic_score_codex":0.0056585157,"about_ca_topic_score_gemma":0.0029434264,"teacher_disagreement_score":0.65488863,"about_ca_system_score_codex":0.00030935436,"about_ca_system_score_gemma":0.00026732494,"threshold_uncertainty_score":0.9999872},"labels":[],"label_agreement":null},{"id":"W7112021005","doi":"","title":"Investigating the Benefits of BIM for Mid-Rise Timber Buildings in Canada: A Qualitative Study","year":2021,"lang":"en","type":"article","venue":"Pure (Coventry University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Prefabrication; Process (computing); SAFER; Documentation; Demolition; Resource (disambiguation); Quality (philosophy); Building information modeling; Production (economics)","score_opus":0.01697557723118748,"score_gpt":0.21394558876663503,"score_spread":0.19697001153544755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7112021005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99734825,0.00013365247,0.0011695777,0.00016024726,0.00015316927,0.00015532887,0.0000341523,0.000015505835,0.0008301459],"genre_scores_gemma":[0.9994369,0.000007814874,0.00036328955,0.000015759291,0.000015866886,0.0000018732973,0.0000047122157,0.0000061765595,0.00014761947],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99956334,0.000046742967,0.000110612586,0.00009608512,0.000084911604,0.00009832493],"domain_scores_gemma":[0.9996665,0.00009849042,0.00003726178,0.0000852764,0.00008451694,0.000027930248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00006794147,0.000066459805,0.00010096213,0.00006076868,0.000047198464,0.000007555827,0.00008113618,0.000027450758,0.00001897288],"category_scores_gemma":[0.000040430736,0.0000643522,0.000029726858,0.00040573406,0.000020426654,0.00006836934,0.000019743182,0.000092169175,3.6861184e-7],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000095765055,0.0002673566,0.1434632,0.0005702164,0.0008903419,0.000091959046,0.11061392,0.3543975,0.007369757,0.35737193,0.003876915,0.020991147],"study_design_scores_gemma":[0.0039061708,0.0001016061,0.04079974,0.0003414592,0.0002463358,0.000016717826,0.8841671,0.021468466,0.019906357,0.0028067876,0.02552838,0.0007108791],"about_ca_topic_score_codex":0.050378114,"about_ca_topic_score_gemma":0.56193167,"teacher_disagreement_score":0.7735532,"about_ca_system_score_codex":0.00021546146,"about_ca_system_score_gemma":0.0002275337,"threshold_uncertainty_score":0.9559455},"labels":[],"label_agreement":null},{"id":"W7114907706","doi":"10.2139/ssrn.5907606","title":"High-Fidelity Synthetic Construction Safety Data Generation Using 3D-Rendering and Generative AI","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Pipeline (software); Generative grammar; Scalability; Domain (mathematical analysis); Synthetic data; Generative model; Virtual reality","score_opus":0.023311516915061052,"score_gpt":0.2624768053080648,"score_spread":0.23916528839300372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114907706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06782947,0.010640665,0.9124825,0.00076397375,0.0071140574,0.00050916366,0.0002943038,0.0001207005,0.00024517108],"genre_scores_gemma":[0.8939654,0.06358961,0.03736168,0.00010654641,0.003956425,0.00002120279,0.0005779848,0.00009801412,0.00032313974],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99372214,0.00054254057,0.0016022112,0.0013158625,0.0005459679,0.0022712846],"domain_scores_gemma":[0.99733,0.000078144556,0.0007075734,0.0011441625,0.00054479425,0.00019532001],"candidate_categories":["metaepi_narrow","sts","research_integrity"],"consensus_categories":[],"category_scores_codex":[0.002858164,0.00089927384,0.0009051608,0.0005637533,0.0013339813,0.0007318862,0.00068296056,0.0008492391,0.000108628774],"category_scores_gemma":[0.00015408645,0.0009878374,0.00018805386,0.00038551647,0.0002880703,0.0011937737,0.0006100262,0.00815361,0.000005925769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":true,"study_design_scores_codex":[0.000114865004,0.000040642026,0.00022918239,0.00019651695,0.0018987828,0.0000033667802,0.00026830428,0.24438672,0.009010756,0.24834493,0.000052449846,0.49545348],"study_design_scores_gemma":[0.0011151044,0.00009762414,0.00006985116,0.0005812524,0.0010608033,0.0031302844,0.0014900094,0.9131526,0.0019612308,0.075175,0.0011070459,0.0010592068],"about_ca_topic_score_codex":0.00056407705,"about_ca_topic_score_gemma":0.002398359,"teacher_disagreement_score":0.8751208,"about_ca_system_score_codex":0.0048103686,"about_ca_system_score_gemma":0.006198756,"threshold_uncertainty_score":0.99996614},"labels":[],"label_agreement":null},{"id":"W7116631454","doi":"10.5430/wje.v15n4p73","title":"Developing a BIM Modeling Instructional Model Based on Flipped Classroom and Collaborative Learning for Architectural Engineering Students","year":2025,"lang":"","type":"article","venue":"World Journal of Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formative assessment; Likert scale; Competence (human resources); Instructional design; Flipped classroom; Process (computing); Engineering education; Collaborative learning; Structural equation modeling; Educational technology","score_opus":0.01117560180951206,"score_gpt":0.2808410754032591,"score_spread":0.26966547359374704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116631454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2909744,0.0007136681,0.7038613,0.00095315755,0.0029864628,0.00028272302,0.0000041390076,0.000022503387,0.0002016409],"genre_scores_gemma":[0.895646,0.000067276254,0.103448816,0.000108904955,0.00038401753,0.000040387484,0.000010025487,0.000028317776,0.00026624658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982523,0.000056454115,0.00088942284,0.00022498934,0.00033493966,0.00024192207],"domain_scores_gemma":[0.9984198,0.00019921557,0.00032626282,0.000096014315,0.0008581546,0.000100536585],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00040206994,0.00029059683,0.00034134017,0.0015635947,0.00027891653,0.00024296132,0.00015717886,0.0001127466,0.000009235387],"category_scores_gemma":[0.00024878877,0.0003083266,0.0001257821,0.0008608909,0.000031042764,0.00032995926,0.000020189864,0.0006882173,5.4946923e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019625507,0.000045338875,0.0009850814,0.00018102283,0.00012974905,1.6397287e-7,0.0003840501,0.8896248,0.00056826975,0.021219308,0.000042921958,0.086623095],"study_design_scores_gemma":[0.0011482282,0.00008988181,0.00087692426,0.0017519975,0.00012314026,0.000018050983,0.00090898346,0.9892877,0.00051286054,0.004110494,0.00092331984,0.00024845474],"about_ca_topic_score_codex":0.0000039351125,"about_ca_topic_score_gemma":0.000016748472,"teacher_disagreement_score":0.6046716,"about_ca_system_score_codex":0.0007282504,"about_ca_system_score_gemma":0.0016974023,"threshold_uncertainty_score":0.9999369},"labels":[],"label_agreement":null},{"id":"W7117960012","doi":"10.1007/978-3-032-01074-2","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 7","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004624941296160505,"score_gpt":0.17577736165996755,"score_spread":0.17115242036380704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117960012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017424279,0.010595568,0.70328116,0.0012685697,0.024329243,0.006034887,0.002950971,0.0022027649,0.24759439],"genre_scores_gemma":[0.94456106,0.00019687164,0.007510735,0.00016034087,0.0014825957,0.0005241895,0.00014252112,0.00037472526,0.045046944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99846065,0.0000019646657,0.0004671836,0.00033429795,0.00023435846,0.00050152466],"domain_scores_gemma":[0.99921614,0.00012745957,0.00007687608,0.00021729956,0.00026208386,0.000100112746],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00014521019,0.0005055429,0.00049467955,0.00035599788,0.00007358736,0.00008363958,0.00041867822,0.0008504327,0.000093499366],"category_scores_gemma":[0.00018219145,0.00049006805,0.00038066044,0.00040941586,0.00004584939,0.00012905366,0.00004610781,0.0011678216,0.0000015810987],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000057547254,0.000007541944,0.00021632639,0.0042636874,0.00039098706,0.0000013076144,0.0018388053,0.9328842,0.0013183149,0.0089672785,0.044450413,0.005655396],"study_design_scores_gemma":[0.0004231412,0.00003078508,0.00025503128,0.002796102,0.00015461838,0.000017632457,0.00002777518,0.6985937,0.0024501919,0.0019135395,0.2923314,0.0010060902],"about_ca_topic_score_codex":0.00063005736,"about_ca_topic_score_gemma":0.08706893,"teacher_disagreement_score":0.94281864,"about_ca_system_score_codex":0.0009767457,"about_ca_system_score_gemma":0.0005743833,"threshold_uncertainty_score":0.9997551},"labels":[],"label_agreement":null},{"id":"W7118000314","doi":"10.1007/978-3-032-01074-2_7","title":"Concerted Actions for BIM Training as Part of a National Digital Transition Plan: A Case Study","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cégep du Vieux Montréal; École de Technologie Supérieure; Group for Research in Decision Analysis","funders":"","keywords":"Training (meteorology); Cornerstone; Listing (finance); Work (physics); Government (linguistics); Set (abstract data type)","score_opus":0.027549232334380596,"score_gpt":0.24089646197317494,"score_spread":0.21334722963879435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118000314","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040397486,0.0006023676,0.9464408,0.00006390835,0.0019003844,0.0013971438,0.0008794664,0.0005735835,0.04410258],"genre_scores_gemma":[0.9986485,0.0000132430305,0.00040516362,0.000014665362,0.00024862535,0.0001350072,0.00015360871,0.000055545737,0.00032562137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99901485,0.000003607138,0.00041355693,0.00022369288,0.00018108758,0.00016322438],"domain_scores_gemma":[0.9993633,0.00032345921,0.00005211224,0.00011661175,0.00010846598,0.000036018442],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0000665776,0.00029877777,0.0003471736,0.00046079827,0.00003870605,0.000039350325,0.000066586836,0.00031132007,0.00007276142],"category_scores_gemma":[0.000090796646,0.00033803497,0.00013326398,0.00011700827,0.000021009912,0.00012378876,0.0000067032142,0.0004194428,0.0000013009707],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003250202,0.000032837957,0.000007604405,0.00043051626,0.00047678826,0.0001007182,0.0033821503,0.9306596,0.00025032062,0.012312234,0.00009911802,0.05221562],"study_design_scores_gemma":[0.004005313,0.0005618982,0.000013586505,0.0030387156,0.00044175435,0.002676947,0.0011545261,0.9111748,0.001376313,0.019902611,0.05348972,0.0021638628],"about_ca_topic_score_codex":0.000015154683,"about_ca_topic_score_gemma":0.0006066582,"teacher_disagreement_score":0.99460876,"about_ca_system_score_codex":0.00016408421,"about_ca_system_score_gemma":0.00009362672,"threshold_uncertainty_score":0.9999072},"labels":[],"label_agreement":null},{"id":"W7118003536","doi":"10.1007/978-3-032-01074-2_4","title":"Enhancing Productivity and Efficiency in Steel Fabrication for Off-Site Construction: A Study on Accurate Estimation Models","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Productivity; Production (economics); Cost estimate; Estimation; Quality (philosophy); Fabrication; Duration (music); Steel mill","score_opus":0.010397744216876597,"score_gpt":0.21979223600338618,"score_spread":0.2093944917865096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118003536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009450924,0.00093017303,0.98282295,0.000043614673,0.0009942675,0.0014195811,0.00002626309,0.0002673401,0.0040448965],"genre_scores_gemma":[0.99543893,0.000062130115,0.0038064474,0.000009166007,0.00015502977,0.00021035825,0.000034781446,0.00005772495,0.00022545565],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870944,0.00001109212,0.00045312187,0.00045366932,0.00016051979,0.0002121559],"domain_scores_gemma":[0.99930894,0.00024626305,0.00007886312,0.00025511053,0.00007985336,0.000030951585],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020016955,0.00038303615,0.00038465078,0.00068643765,0.00004603391,0.000056460132,0.00007903902,0.00029999678,0.000006969623],"category_scores_gemma":[0.00017945096,0.00042359394,0.000051981257,0.0001946593,0.000023358247,0.00020381647,0.000020440935,0.0005614715,0.0000012059593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015859237,0.000015456699,0.000044412933,0.00028917787,0.000026331505,0.0000012189065,0.00050615886,0.9219188,0.00065356767,0.00509751,0.000004402979,0.07142711],"study_design_scores_gemma":[0.00051359966,0.00007746268,0.00031033365,0.00078006444,0.0000408227,0.000009469318,0.000013866001,0.99028045,0.0016898108,0.005586369,0.00027064505,0.00042709312],"about_ca_topic_score_codex":0.000009174712,"about_ca_topic_score_gemma":0.00079697435,"teacher_disagreement_score":0.98598796,"about_ca_system_score_codex":0.00028849576,"about_ca_system_score_gemma":0.00004144716,"threshold_uncertainty_score":0.9998216},"labels":[],"label_agreement":null},{"id":"W7118013839","doi":"10.1007/978-3-032-01074-2_3","title":"Modular Construction Planning and Constructability Analysis for Energy Storage Systems Using a Digitized Platform","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Constructability; Modular design; Pinch analysis; Efficient energy use; Stakeholder; Renewable energy; Timeline; Construction management; Energy storage","score_opus":0.01090926245875461,"score_gpt":0.20253308267603884,"score_spread":0.19162382021728422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118013839","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026173024,0.0050275177,0.9860455,0.0000037972852,0.0013036252,0.00031765908,0.00015201738,0.0003856999,0.0041469038],"genre_scores_gemma":[0.99112934,0.000095596195,0.0080195,0.000008458508,0.0002477781,0.00005998803,0.00015081801,0.000085896754,0.00020261676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99850774,0.0000066871976,0.0005821566,0.00043618854,0.00016675283,0.0003004623],"domain_scores_gemma":[0.9991343,0.00031547554,0.000106558655,0.00028327294,0.00008877167,0.00007162893],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000117348514,0.0005111646,0.0008080236,0.0010286875,0.00007105643,0.0001227499,0.000097434415,0.00066911796,0.000020505777],"category_scores_gemma":[0.00007400857,0.0005715132,0.00021058146,0.00025828497,0.00007187704,0.00015070193,0.000028401602,0.00046402164,1.459569e-7],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013562837,0.0000014515523,0.00022059819,0.0005239351,0.0006141903,0.0000042,0.0000592081,0.9646443,0.0005105632,0.027712764,0.0000025529362,0.005692663],"study_design_scores_gemma":[0.0003661819,0.0000120353825,0.000034368193,0.0005787878,0.00044101736,0.00005044605,0.000010801493,0.9903011,0.0002639497,0.005228584,0.0021902414,0.00052252],"about_ca_topic_score_codex":0.000041925607,"about_ca_topic_score_gemma":0.00014778519,"teacher_disagreement_score":0.98851204,"about_ca_system_score_codex":0.00039657444,"about_ca_system_score_gemma":0.00005135298,"threshold_uncertainty_score":0.9996736},"labels":[],"label_agreement":null},{"id":"W7118121254","doi":"10.5281/zenodo.18137096","title":"Maximizing the Project Efficiency Through Comprehensive BIM Coordination and GIS Integration","year":2024,"lang":"","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Timeline; Drone; Work (physics); Project management; Geographic information system; System integration; Data integration; Cloud computing","score_opus":0.03872971686596222,"score_gpt":0.2549167738732913,"score_spread":0.2161870570073291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118121254","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04590096,0.014486498,0.65878505,0.010461409,0.0043817316,0.0041655763,0.0007214594,0.005990887,0.25510642],"genre_scores_gemma":[0.99535745,0.0013365322,0.00051501946,0.00007994785,0.00036691624,3.2216897e-7,0.00066453055,0.0011109773,0.0005683059],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977674,0.00040161327,0.0004560775,0.0005675826,0.00041953073,0.000387796],"domain_scores_gemma":[0.9987163,0.0000752019,0.00008655763,0.00037208662,0.00067315425,0.00007668457],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0004966821,0.0002969316,0.0001961367,0.0003615393,0.0028869093,0.0033320703,0.0005108437,0.00015611557,0.0024272318],"category_scores_gemma":[0.00024157167,0.00025201126,0.00008789378,0.0014265823,0.00043441882,0.0008791231,0.00041388135,0.0007109443,0.0015879952],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035874542,0.000044764973,5.575422e-7,0.00035795383,0.000114689174,0.000008961292,0.010069797,0.0003709129,0.009387993,0.15691482,0.0518351,0.7708586],"study_design_scores_gemma":[0.0003116133,0.0002293873,0.000119483484,0.0003530514,0.00007892192,0.0004130669,0.005344453,0.09655856,0.0011164391,0.0015592322,0.8936063,0.00030949805],"about_ca_topic_score_codex":0.00005070488,"about_ca_topic_score_gemma":9.106648e-7,"teacher_disagreement_score":0.9494565,"about_ca_system_score_codex":0.00027879808,"about_ca_system_score_gemma":0.000011014379,"threshold_uncertainty_score":0.9999932},"labels":[],"label_agreement":null},{"id":"W7118122392","doi":"10.5281/zenodo.18137097","title":"Maximizing the Project Efficiency Through Comprehensive BIM Coordination and GIS Integration","year":2024,"lang":"","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Timeline; Drone; Work (physics); Project management; Geographic information system; System integration; Data integration; Cloud computing","score_opus":0.03872971686596222,"score_gpt":0.2549167738732913,"score_spread":0.2161870570073291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118122392","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04590096,0.014486498,0.65878505,0.010461409,0.0043817316,0.0041655763,0.0007214594,0.005990887,0.25510642],"genre_scores_gemma":[0.99535745,0.0013365322,0.00051501946,0.00007994785,0.00036691624,3.2216897e-7,0.00066453055,0.0011109773,0.0005683059],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977674,0.00040161327,0.0004560775,0.0005675826,0.00041953073,0.000387796],"domain_scores_gemma":[0.9987163,0.0000752019,0.00008655763,0.00037208662,0.00067315425,0.00007668457],"candidate_categories":["metaepi_narrow","sts","scholarly_communication","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0004966821,0.0002969316,0.0001961367,0.0003615393,0.0028869093,0.0033320703,0.0005108437,0.00015611557,0.0024272318],"category_scores_gemma":[0.00024157167,0.00025201126,0.00008789378,0.0014265823,0.00043441882,0.0008791231,0.00041388135,0.0007109443,0.0015879952],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035874542,0.000044764973,5.575422e-7,0.00035795383,0.000114689174,0.000008961292,0.010069797,0.0003709129,0.009387993,0.15691482,0.0518351,0.7708586],"study_design_scores_gemma":[0.0003116133,0.0002293873,0.000119483484,0.0003530514,0.00007892192,0.0004130669,0.005344453,0.09655856,0.0011164391,0.0015592322,0.8936063,0.00030949805],"about_ca_topic_score_codex":0.00005070488,"about_ca_topic_score_gemma":9.106648e-7,"teacher_disagreement_score":0.9494565,"about_ca_system_score_codex":0.00027879808,"about_ca_system_score_gemma":0.000011014379,"threshold_uncertainty_score":0.9999932},"labels":[],"label_agreement":null},{"id":"W7119569717","doi":"","title":"Industrial housing as European crisis response","year":2025,"lang":"en","type":"article","venue":"University of Southern Denmark Research Portal (University of Southern Denmark)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Innovation Cluster (Canada)","funders":"","keywords":"Desk; Affordable housing; Production (economics); Productivity; Industrial policy; Industrial production; Public policy; Financial crisis","score_opus":0.025198651945721396,"score_gpt":0.23178388370635677,"score_spread":0.20658523176063537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7119569717","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8947222,0.00012758542,0.0015154474,0.0002525613,0.0001507175,0.00026142175,0.00036717532,0.00012122441,0.10248165],"genre_scores_gemma":[0.9838066,0.00006964343,0.00038354844,0.00000955623,0.000042602707,6.1352104e-8,0.000017086015,0.00003273424,0.015638184],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.99754137,0.00068320596,0.00024450602,0.00039342928,0.00068538863,0.00045211177],"domain_scores_gemma":[0.998476,0.00021606231,0.00014275544,0.00049870904,0.00047223628,0.00019418757],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0015630764,0.00023267612,0.0003678,0.0010418076,0.00053760345,0.000036460686,0.00082295417,0.00029572437,0.005754872],"category_scores_gemma":[0.00011094149,0.00031405702,0.00026997447,0.0011516095,0.00076913973,0.00019774347,0.00029943977,0.0007320541,0.0013865212],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.037922457,0.0015756648,0.12772158,0.0017039868,0.007089128,0.0044392487,0.17365886,0.005183353,0.08310718,0.009881926,0.28466487,0.26305175],"study_design_scores_gemma":[0.004148538,0.00023905786,0.0025593978,0.00056544406,0.0002530388,0.000019593037,0.9462412,0.0014936008,0.0009803228,0.00091855443,0.041884612,0.0006966293],"about_ca_topic_score_codex":0.0019739345,"about_ca_topic_score_gemma":0.0009074773,"teacher_disagreement_score":0.77258235,"about_ca_system_score_codex":0.00013506583,"about_ca_system_score_gemma":0.00029181736,"threshold_uncertainty_score":0.99993116},"labels":[],"label_agreement":null},{"id":"W7125606114","doi":"10.1109/wsc68292.2025.11339107","title":"Optimizing Precast Concrete Production: A Discrete-Event Simulation Approach with Simphony","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Precast concrete; Work (physics); Joint (building); Process (computing)","score_opus":0.009569416548447786,"score_gpt":0.2305413048768909,"score_spread":0.2209718883284431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7125606114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01298083,0.00087985926,0.89745253,0.0004975457,0.001930166,0.0010768145,0.000008632908,0.0004357459,0.084737875],"genre_scores_gemma":[0.9643189,0.000070070055,0.025388796,0.00005355139,0.00035959383,0.00012849507,0.00004068277,0.000044285203,0.009595684],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978866,0.0000793971,0.000636806,0.0006809643,0.0003129519,0.0004032593],"domain_scores_gemma":[0.9989165,0.000059519345,0.00012666282,0.00051020976,0.0002820824,0.00010504025],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00020507055,0.00045404045,0.00037726216,0.00027839755,0.00032362383,0.00026168162,0.00015301122,0.00025402513,0.00033689436],"category_scores_gemma":[0.000043718865,0.00039326044,0.00012944825,0.000967104,0.00015975788,0.00064953417,0.000047130194,0.00043521664,0.0000234747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015951126,0.000014657135,0.00018463565,0.00028909836,0.00029130615,9.227912e-7,0.00082231127,0.95956564,0.00060429587,0.0109122,0.00034536773,0.026810057],"study_design_scores_gemma":[0.00078210153,0.000100175675,0.00016446554,0.00034546072,0.00022528078,0.000023881099,0.0020799271,0.98240143,0.0056778723,0.00013963266,0.007581339,0.00047841077],"about_ca_topic_score_codex":0.000040355317,"about_ca_topic_score_gemma":0.000018704695,"teacher_disagreement_score":0.951338,"about_ca_system_score_codex":0.00029578945,"about_ca_system_score_gemma":0.0001658934,"threshold_uncertainty_score":0.99985194},"labels":[],"label_agreement":null},{"id":"W7126020313","doi":"10.22178/pos.125-15","title":"Global Adoption of Digital Tools and Innovation in Construction: A Comparative Analysis of the UK, US, Canada, Africa, China, and Europe","year":2025,"lang":"en","type":"article","venue":"Path of Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pace; Digital transformation; Investment (military); Certification; Government (linguistics); Key (lock); Information technology; Private sector","score_opus":0.011549227709282359,"score_gpt":0.22138066999537223,"score_spread":0.20983144228608988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126020313","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99217373,0.000059797476,0.0016186083,0.00001751037,0.0000798193,0.000042329437,0.0000765905,0.000002545323,0.0059290533],"genre_scores_gemma":[0.9997678,0.0000060120665,0.00021383143,0.000002080765,0.0000013313197,9.4874525e-7,0.0000017510458,3.2596068e-7,0.0000059513673],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9995891,0.0000059116355,0.00018572604,0.00006634006,0.00011210837,0.00004080576],"domain_scores_gemma":[0.99973994,0.000011405791,0.000062683255,0.00005728369,0.0001213552,0.000007345902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008198025,0.000034074445,0.000094491246,0.00017606076,0.000026381635,0.000014585761,0.000052327567,0.000011270891,0.000001686685],"category_scores_gemma":[0.000039013725,0.000026846516,0.000007287152,0.004463257,0.00042834025,0.00015469412,0.000017573977,0.000025277383,1.1079978e-8],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000062108015,0.000006084553,0.8781137,0.000025108688,0.000030202831,7.38112e-8,0.0003097709,0.008589006,0.0047657597,0.09858067,0.00002354187,0.009549883],"study_design_scores_gemma":[0.00005951425,0.0000061160904,0.98128814,0.000023637891,0.000018662839,0.0000011040138,0.00041504088,0.01632379,0.0015808259,0.00022609772,0.00003301795,0.000024048457],"about_ca_topic_score_codex":0.0018761758,"about_ca_topic_score_gemma":0.0073738294,"teacher_disagreement_score":0.10317446,"about_ca_system_score_codex":0.00003418038,"about_ca_system_score_gemma":0.00011568956,"threshold_uncertainty_score":0.411477},"labels":[],"label_agreement":null},{"id":"W7126047724","doi":"10.1109/icac69156.2025.11361506","title":"Digital Collaboration Through BIM and its Influence on Project Success in Socio-Economic Contexts","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Inro Consultants (Canada)","funders":"","keywords":"Building information modeling; Stakeholder; Project stakeholder; Schedule; Project management; Project planning; Exploratory research; Integrated project delivery","score_opus":0.0073535610597753745,"score_gpt":0.259436662829289,"score_spread":0.25208310176951365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126047724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9350753,0.0012956543,0.0007306717,0.0006686865,0.00093537965,0.00066608505,0.00006335546,0.00010072422,0.06046414],"genre_scores_gemma":[0.9970826,0.0004563591,0.000033616983,0.00014244762,0.00004479897,0.00006388622,0.000009556123,0.0000133244075,0.0021534092],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988389,0.000029009876,0.00048173007,0.00035575998,0.00008233872,0.00021228116],"domain_scores_gemma":[0.9995828,0.0000896694,0.000064924076,0.00013876118,0.00009674432,0.00002709551],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000059453727,0.00024130926,0.00024452637,0.0002329792,0.000101793776,0.00051624957,0.00009567569,0.00022654775,0.000067072746],"category_scores_gemma":[0.000030066229,0.00025090468,0.000034145476,0.0004326375,0.00007324356,0.0018369384,0.000030563155,0.00022232025,0.00006264303],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016043239,0.00007030311,0.024187883,0.0002969128,0.00012158132,0.0000034629993,0.0022654738,0.014299167,0.0008017965,0.8380476,0.00085310126,0.118892275],"study_design_scores_gemma":[0.019318813,0.0016039045,0.112751864,0.0050390474,0.00029447477,0.000062951985,0.056151778,0.5591153,0.11687243,0.04973972,0.073305905,0.005743839],"about_ca_topic_score_codex":0.0001204792,"about_ca_topic_score_gemma":0.00043931973,"teacher_disagreement_score":0.7883079,"about_ca_system_score_codex":0.00036165206,"about_ca_system_score_gemma":0.0002930542,"threshold_uncertainty_score":0.99999434},"labels":[],"label_agreement":null},{"id":"W7127882557","doi":"10.22260/crc-csce-2025/0008","title":"AI-Supported Real-Time Schedule Updating and Maintenance in 4D BIM","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Schedule; Process (computing); Key (lock); Scheduling (production processes); Production (economics)","score_opus":0.004453973915059728,"score_gpt":0.22143950357115372,"score_spread":0.216985529656094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127882557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57510626,0.00050425413,0.09261938,0.00369982,0.0014691629,0.0005347855,0.000017229142,0.0004416156,0.32560748],"genre_scores_gemma":[0.98420364,0.00034071127,0.010799968,0.00028374503,0.000048806032,0.000021680467,0.000011480297,0.000019067158,0.0042709266],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863833,0.00003786418,0.0005562556,0.00033103602,0.00009709424,0.00033942406],"domain_scores_gemma":[0.99952084,0.000048863007,0.000050771956,0.00022208558,0.0000909043,0.00006653735],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00021567606,0.00022595025,0.00026649312,0.00030775915,0.000108688735,0.00016823626,0.0000899901,0.00021308092,0.0016447378],"category_scores_gemma":[0.000060339262,0.00023184324,0.000045945424,0.00067661604,0.00010655592,0.00031468392,0.000049359795,0.0003440185,0.00006489051],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026784312,0.0000316397,0.013101918,0.00017446218,0.00007080434,0.000007851154,0.00013107157,0.0007425427,0.01640519,0.91114205,0.00197128,0.056194384],"study_design_scores_gemma":[0.001918692,0.000053793636,0.017961038,0.0009949153,0.00006592146,0.000036286954,0.0031181986,0.9346625,0.020293089,0.016002618,0.004232449,0.0006604969],"about_ca_topic_score_codex":0.00034615974,"about_ca_topic_score_gemma":0.00023793544,"teacher_disagreement_score":0.93391997,"about_ca_system_score_codex":0.00011793952,"about_ca_system_score_gemma":0.00012568245,"threshold_uncertainty_score":0.9992679},"labels":[],"label_agreement":null},{"id":"W7127941768","doi":"10.22260/crc-csce-2025/0030","title":"Standardizing whole-building lifecycle assessment (wbLCA) benchmarking framework facilitated by adopting OpenBIM for Canadian building sector","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Benchmarking; Process (computing); Measure (data warehouse); Work (physics); System lifecycle","score_opus":0.010982047889720814,"score_gpt":0.27987274328474054,"score_spread":0.26889069539501975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127941768","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06061612,0.0017742454,0.91770536,0.0011540311,0.0058115046,0.0014312234,0.0008081894,0.00038218588,0.010317144],"genre_scores_gemma":[0.7602293,0.000077402976,0.23790704,0.00033777635,0.00039528473,0.00021038386,0.00009830072,0.00008595337,0.00065856194],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99545246,0.00013522906,0.0013479684,0.0010448085,0.00047500632,0.0015444998],"domain_scores_gemma":[0.99744767,0.0007421449,0.00020906237,0.0005565677,0.0004706461,0.0005739062],"candidate_categories":["metaepi_narrow","sts","scholarly_communication"],"consensus_categories":[],"category_scores_codex":[0.0011752117,0.000787194,0.000796158,0.0008418642,0.0017729152,0.0013589798,0.00050075364,0.00077638874,0.00082686025],"category_scores_gemma":[0.000312248,0.00092942925,0.00036856692,0.0013252065,0.00010301461,0.00082337036,0.00011909358,0.0012649951,0.0000082632505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009772022,0.00007477248,0.007958687,0.0017264904,0.0018635818,0.000011275007,0.001320079,0.08087332,0.075010344,0.2940263,0.032035477,0.50500196],"study_design_scores_gemma":[0.0017903539,0.00019061439,0.00079633074,0.0045416146,0.00038798808,0.000011055789,0.006703941,0.51094556,0.015657239,0.0042987275,0.45276254,0.001914044],"about_ca_topic_score_codex":0.017934646,"about_ca_topic_score_gemma":0.014367685,"teacher_disagreement_score":0.69961315,"about_ca_system_score_codex":0.0032196022,"about_ca_system_score_gemma":0.0012886425,"threshold_uncertainty_score":0.9996777},"labels":[],"label_agreement":null},{"id":"W7127945557","doi":"10.22260/crc-csce-2025/0150","title":"Assessing the Effectiveness of BIM in Achieving Compliance with NECB Energy Efficiency Pathways","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Efficient energy use; Compliance (psychology); Energy (signal processing); Production (economics); Key (lock)","score_opus":0.014279999607224784,"score_gpt":0.24887183679678468,"score_spread":0.2345918371895599,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127945557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2967564,0.0009946318,0.65151346,0.000052101488,0.0005570039,0.00016764732,0.0000014976487,0.000050801005,0.049906496],"genre_scores_gemma":[0.99905044,0.000052759962,0.0007516839,0.000029038656,0.000020912745,0.00003316023,0.0000016520897,0.000013864881,0.000046477435],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99858695,0.00031352328,0.00042823388,0.00026258358,0.00016303113,0.0002456566],"domain_scores_gemma":[0.9987836,0.0006916815,0.00008450012,0.00030073867,0.000115414456,0.000024081166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006347454,0.00022016666,0.00030801186,0.00021063958,0.0001481047,0.00013856086,0.00021554592,0.000112189795,0.00003472256],"category_scores_gemma":[0.0000476314,0.00014893584,0.00006357691,0.0012831419,0.0001702634,0.00030856678,0.00004114082,0.00027018847,0.0000015240507],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007595476,0.000098540615,0.02327881,0.0009019178,0.000077220255,0.0000027369524,0.00015618616,0.10657342,0.03294902,0.6986533,0.0000045402026,0.1372284],"study_design_scores_gemma":[0.0017442475,0.00015992502,0.32847548,0.009749988,0.00009528687,0.000021087133,0.003351518,0.5290577,0.12203331,0.0043268776,0.00042278398,0.0005618226],"about_ca_topic_score_codex":0.00036409195,"about_ca_topic_score_gemma":0.00016408291,"teacher_disagreement_score":0.70229405,"about_ca_system_score_codex":0.00013124701,"about_ca_system_score_gemma":0.0001517181,"threshold_uncertainty_score":0.6073427},"labels":[],"label_agreement":null},{"id":"W7127952500","doi":"10.22260/crc-csce-2025/0202","title":"Enhancing Request for Information (RFI) Process in Construction through Digitalization and Automation","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Process (computing); Automation; Process automation system; Information system; Information technology","score_opus":0.004733481902958049,"score_gpt":0.235377252708329,"score_spread":0.23064377080537093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127952500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086077295,0.0002495213,0.8802744,0.0003150626,0.001611444,0.0011061161,0.000022500495,0.00029155982,0.030052092],"genre_scores_gemma":[0.9903188,0.00023645358,0.008733691,0.000106262625,0.00006289286,0.00020017593,0.00019581553,0.000012823436,0.0001331305],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985057,0.000023679802,0.00089799764,0.00021450127,0.00013486712,0.0002232231],"domain_scores_gemma":[0.99927527,0.00007009209,0.00015978709,0.00012719024,0.00033764093,0.000029993267],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00018808493,0.00023087108,0.00022874674,0.0004492636,0.00015627802,0.00038054673,0.000058316324,0.00029261716,0.000029182966],"category_scores_gemma":[0.00017863949,0.0002578806,0.0000409425,0.0007785952,0.00007763798,0.005206342,0.000014029959,0.00013963276,0.0000060484176],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061149796,0.000030064892,0.0025394582,0.0023853444,0.0000529689,1.0565554e-7,0.003395323,0.008878146,0.00084172003,0.76158565,0.00015812158,0.22007197],"study_design_scores_gemma":[0.0032967622,0.00013250313,0.006785859,0.001981884,0.00013169413,0.000035666355,0.013434191,0.77608347,0.058389574,0.12940677,0.009485518,0.0008360928],"about_ca_topic_score_codex":0.000055074084,"about_ca_topic_score_gemma":0.0001768324,"teacher_disagreement_score":0.90424144,"about_ca_system_score_codex":0.00024510323,"about_ca_system_score_gemma":0.0001272854,"threshold_uncertainty_score":0.99998736},"labels":[],"label_agreement":null},{"id":"W7127964300","doi":"10.22260/crc-csce-2025/0211","title":"Current Status of Digital Twins in the AEC Industry and Opportunities in Construction Project Management from a Literature Review and a Quebec Perspective","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Project management; Current (fluid); Construction industry; Construction management","score_opus":0.02083204261100219,"score_gpt":0.27032672875607033,"score_spread":0.24949468614506815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127964300","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1496051,0.8026151,0.0006426032,0.0021377606,0.00063117925,0.002359984,0.00041989752,0.000045077857,0.041543264],"genre_scores_gemma":[0.621003,0.37793544,0.00019059316,0.00013358315,0.000030385845,0.000116185445,0.000043169868,0.000009058074,0.0005386011],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9988823,0.00008956369,0.00045551074,0.00026462213,0.00011951533,0.00018847923],"domain_scores_gemma":[0.9995934,0.000053749663,0.00007335378,0.00015874208,0.000089401845,0.000031369083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000110444766,0.0002144552,0.0003052741,0.00040371984,0.000031559917,0.00020024982,0.000066350156,0.00016991567,0.000035907884],"category_scores_gemma":[0.000027029826,0.00016603805,0.00003791443,0.000607034,0.00019575567,0.00046599863,0.00005237408,0.0006787308,1.8855386e-7],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034260065,0.0000806389,0.010935851,0.0034996618,0.0001451258,0.000013134484,0.008407256,0.0000059080235,0.000002809803,0.31294945,0.00059139624,0.6633345],"study_design_scores_gemma":[0.0052619847,0.00022836932,0.1539972,0.081897825,0.0013043401,0.00016125347,0.64241767,0.00338977,0.0000752369,0.035130203,0.074691996,0.0014441363],"about_ca_topic_score_codex":0.0023481066,"about_ca_topic_score_gemma":0.0027369238,"teacher_disagreement_score":0.6618904,"about_ca_system_score_codex":0.00020852017,"about_ca_system_score_gemma":0.00014798144,"threshold_uncertainty_score":0.67708355},"labels":[],"label_agreement":null},{"id":"W7127967568","doi":"10.22260/crc-csce-2025/0129","title":"Conceptual Model for Enhancing Construction Productivity Through Real-Time Physiological Monitoring and Fuzzy Hybrid Modeling","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Canada First Research Excellence Fund; University of Alberta","keywords":"Conceptual model; Fuzzy logic; Productivity; Conceptual design; Field (mathematics); Component (thermodynamics); Data modeling","score_opus":0.026836496668527627,"score_gpt":0.2598339678347913,"score_spread":0.23299747116626365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127967568","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42343098,0.00038474167,0.5703179,0.00009582485,0.001379122,0.0005518166,0.000023231683,0.00029090294,0.0035254215],"genre_scores_gemma":[0.92148715,0.00070291973,0.076206446,0.000012243323,0.0006073773,0.00014159289,0.000014535395,0.000032581258,0.0007951322],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99767697,0.000060065373,0.0007303405,0.00084152,0.00017614366,0.0005149542],"domain_scores_gemma":[0.9990668,0.0001115207,0.000104827624,0.00031571966,0.0003175354,0.00008358572],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00025248755,0.0004679911,0.00057440513,0.00012154155,0.0005028645,0.00015038332,0.00012057706,0.0002886935,0.000031105912],"category_scores_gemma":[0.000120041914,0.00047175205,0.00016123628,0.0002288804,0.00034931282,0.00086764613,0.00008186721,0.00039949146,0.000006312009],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000117321535,0.000041128427,0.000068280875,0.0002232051,0.00017345173,4.0950368e-7,0.00086503703,0.52261925,0.32426965,0.12839982,0.00012555033,0.023096869],"study_design_scores_gemma":[0.00060496706,0.000055358927,0.000016032622,0.00020698081,0.00012230146,0.000015577492,0.0016440433,0.8762297,0.08259325,0.03808994,0.000026237021,0.0003956187],"about_ca_topic_score_codex":0.00008313817,"about_ca_topic_score_gemma":0.000009009222,"teacher_disagreement_score":0.4980562,"about_ca_system_score_codex":0.00022485835,"about_ca_system_score_gemma":0.0001548284,"threshold_uncertainty_score":0.99977344},"labels":[],"label_agreement":null},{"id":"W7127969627","doi":"10.22260/crc-csce-2025/0060","title":"Physics-Based Simulation for Construction Activity Sequence Planning","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Sequence (biology); Process (computing); Identification (biology); Key (lock); Context (archaeology)","score_opus":0.03371704381223966,"score_gpt":0.3080498975055795,"score_spread":0.2743328536933398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127969627","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026559053,0.000079243575,0.9602501,0.00017652141,0.0026983859,0.00067454454,0.000034117325,0.00030235958,0.009225677],"genre_scores_gemma":[0.9822626,0.0000036715448,0.016880916,0.00008003961,0.00022222783,0.00009149077,0.000025182593,0.000018582046,0.0004153049],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894786,0.000033600754,0.00032299815,0.0003210572,0.00012378687,0.00025071568],"domain_scores_gemma":[0.99908924,0.0003203175,0.00009878038,0.00021576471,0.00023085416,0.00004504244],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.000113155205,0.00024877043,0.00022294561,0.00015133752,0.00027691358,0.00013276642,0.000079402744,0.00023835595,0.00010860404],"category_scores_gemma":[0.000059694892,0.0002826276,0.00012548905,0.0004227462,0.00010898776,0.00043496903,0.000009792469,0.00021204488,0.000009604951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001025698,0.000013872007,0.00029831316,0.00016893283,0.000044439923,1.2332629e-7,0.000030061437,0.6062945,0.018234445,0.038080048,0.000058607122,0.3366741],"study_design_scores_gemma":[0.0010856874,0.00004105518,0.00033810516,0.00016818426,0.00007892213,7.6513265e-7,0.00009886672,0.8771391,0.112141624,0.0061842585,0.0025008814,0.00022256465],"about_ca_topic_score_codex":0.000025326166,"about_ca_topic_score_gemma":0.000005082065,"teacher_disagreement_score":0.95570356,"about_ca_system_score_codex":0.00027087383,"about_ca_system_score_gemma":0.00019124319,"threshold_uncertainty_score":0.99996257},"labels":[],"label_agreement":null},{"id":"W7127994154","doi":"10.22260/crc-csce-2025/0039","title":"Review of the policy context surrounding the digital transformation of the public construction industry in France and Quebec","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Construction industry; Digital transformation; Public policy; Industry 4.0","score_opus":0.0072197432617208,"score_gpt":0.21697835824747538,"score_spread":0.20975861498575457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127994154","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9302388,0.008136507,0.003397626,0.015672734,0.000887549,0.0006697291,0.00001991219,0.000045983248,0.040931158],"genre_scores_gemma":[0.99901354,0.0005528363,0.000005163621,0.00024373892,0.000010993521,0.000008582881,7.456742e-7,0.0000021132391,0.000162306],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.999572,0.000028099086,0.00024028005,0.00003922599,0.000066550136,0.000053845393],"domain_scores_gemma":[0.99975765,0.00003473601,0.00004543819,0.00011497974,0.000040706032,0.0000065026056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010569336,0.000051675066,0.00008466075,0.000046771966,0.00004076548,0.00002625193,0.00008803094,0.00008498614,0.000013904205],"category_scores_gemma":[0.000062312436,0.000025716554,0.000037440124,0.0005022128,0.00013827998,0.00023219804,0.0000096106,0.00023454825,2.059226e-7],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014257158,0.000005917903,0.033345174,0.0011548434,0.000023540357,8.390737e-9,0.00033307975,0.000042042353,0.0003593376,0.49804333,0.0003980349,0.46629328],"study_design_scores_gemma":[0.0034453967,0.00004346039,0.54640657,0.03776452,0.0001748699,0.00018615137,0.026405478,0.016391579,0.06763627,0.018612823,0.28206432,0.0008685411],"about_ca_topic_score_codex":0.0004713912,"about_ca_topic_score_gemma":0.0010513109,"teacher_disagreement_score":0.5130614,"about_ca_system_score_codex":0.000036379588,"about_ca_system_score_gemma":0.0000708242,"threshold_uncertainty_score":0.10486906},"labels":[],"label_agreement":null},{"id":"W7128036218","doi":"10.22260/crc-csce-2025/0194","title":"Optimizing DFMA Implementation in On-Site Construction: A Decision-Making Framework","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Process (computing); Work (physics); Software; Key (lock); Quality (philosophy)","score_opus":0.00685653612121638,"score_gpt":0.2904395617105004,"score_spread":0.283583025589284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128036218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09240274,0.00075290015,0.84920925,0.00049881596,0.0064438023,0.00050677743,0.000016045295,0.00022675471,0.049942903],"genre_scores_gemma":[0.8389141,0.00022508815,0.16015446,0.0003710317,0.00016835945,0.00005315994,0.000007154881,0.00002401883,0.000082605766],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976986,0.0000667573,0.0010047182,0.0005123536,0.0002871833,0.00043035496],"domain_scores_gemma":[0.9987404,0.0005755058,0.00011394585,0.00038631723,0.00012179947,0.00006206531],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00024902134,0.00036670954,0.00035094743,0.0009777176,0.0002399562,0.0003076675,0.0001621146,0.0003949056,0.004374009],"category_scores_gemma":[0.00010695391,0.0004066108,0.00014643015,0.0015559989,0.0000852422,0.00041497906,0.00005756633,0.0007398444,0.00013839407],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007029316,0.000020812631,0.0053516985,0.000043885215,0.000060075097,0.0000049498794,0.0006320037,0.023940897,0.00008259696,0.33896774,0.00045536604,0.63036966],"study_design_scores_gemma":[0.006798795,0.000406433,0.03335118,0.018838296,0.00036370842,0.00016153442,0.051701184,0.4142549,0.009338273,0.4385248,0.02320206,0.0030587984],"about_ca_topic_score_codex":0.00006095924,"about_ca_topic_score_gemma":0.0003840025,"teacher_disagreement_score":0.7465114,"about_ca_system_score_codex":0.0005418745,"about_ca_system_score_gemma":0.00014355277,"threshold_uncertainty_score":0.9998386},"labels":[],"label_agreement":null},{"id":"W7128039869","doi":"10.22260/crc-csce-2025/0159","title":"Unlocking Digital Construction Management Software to Support Cash Flow and Profitability Analysis","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Profitability index; Cash flow; Software; Cash flow forecasting; Payment; Construction management; Cash","score_opus":0.00520425482033174,"score_gpt":0.2172607756755987,"score_spread":0.21205652085526697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128039869","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13102663,0.00010004774,0.8283914,0.0003046788,0.0013765986,0.00070423324,0.000085442145,0.00034812922,0.037662897],"genre_scores_gemma":[0.96392524,0.000039335544,0.033012588,0.00007700889,0.000044752633,0.000057846013,0.00004989146,0.000014262992,0.0027790738],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99820095,0.000024677754,0.0006181968,0.0006048793,0.00022077977,0.0003305109],"domain_scores_gemma":[0.99918795,0.000043769538,0.000049588638,0.0004012744,0.00016723375,0.00015018538],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00016393555,0.00031458947,0.00038652576,0.0008025144,0.00021031087,0.0005187983,0.000108990185,0.00016698649,0.00087156537],"category_scores_gemma":[0.000040867257,0.0003331303,0.00018682041,0.0020332956,0.00011546247,0.00048134307,0.0001388737,0.0001886592,0.00004130854],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025855812,0.000024885443,0.11833178,0.0003053949,0.0016899637,0.000004006373,0.00017262167,0.007694569,0.000015520565,0.015032218,0.00039819945,0.856305],"study_design_scores_gemma":[0.004294133,0.00060592324,0.38997915,0.00080970925,0.015792003,0.00018696996,0.025997413,0.47203952,0.0060619703,0.021405904,0.058248185,0.00457914],"about_ca_topic_score_codex":0.00003392785,"about_ca_topic_score_gemma":0.00013772563,"teacher_disagreement_score":0.8517258,"about_ca_system_score_codex":0.00025647585,"about_ca_system_score_gemma":0.00004640793,"threshold_uncertainty_score":0.9999121},"labels":[],"label_agreement":null},{"id":"W7128087951","doi":"10.22260/crc-csce-2025/0184","title":"Assessing the Impact of Prefabrication on the Carbon Footprint of Multi-Story Residential Construction","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Carbon footprint; Prefabrication; Life-cycle assessment; Footprint; Construction industry; Environmental impact assessment","score_opus":0.020971428580895127,"score_gpt":0.29800944915881816,"score_spread":0.27703802057792304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128087951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.930818,0.00043614002,0.03764031,0.0005360989,0.0016111485,0.00054769195,0.0000051074503,0.000054301003,0.028351195],"genre_scores_gemma":[0.9990661,0.000080812715,0.00049801066,0.000006503225,0.00007299924,0.000023310411,0.0000019113656,0.000013014254,0.00023731169],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9984631,0.00029895894,0.00062939303,0.0002078183,0.00023685205,0.0001638587],"domain_scores_gemma":[0.99846303,0.0003479292,0.00033360772,0.0005347129,0.00029621224,0.000024501447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005383775,0.0002113588,0.00024134316,0.0002217353,0.00018411585,0.000086633845,0.00022530662,0.00017426017,0.00008917539],"category_scores_gemma":[0.00018083747,0.00012413553,0.00025825616,0.00052162,0.00037149253,0.00009917223,0.000039549388,0.00044353137,0.000001408203],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013480501,0.00020054368,0.013948465,0.00028140366,0.0011480112,2.758989e-7,0.0015945925,0.0752381,0.31081286,0.21045005,0.00021526976,0.38597563],"study_design_scores_gemma":[0.0007988974,0.00014927599,0.26949903,0.0006118693,0.00028167162,0.000010950924,0.00693501,0.33984527,0.37917602,0.002332866,0.00009391491,0.00026521992],"about_ca_topic_score_codex":0.0016654476,"about_ca_topic_score_gemma":0.00007007576,"teacher_disagreement_score":0.3857104,"about_ca_system_score_codex":0.00029038402,"about_ca_system_score_gemma":0.00028730402,"threshold_uncertainty_score":0.50621},"labels":[],"label_agreement":null},{"id":"W7128178412","doi":"10.36680/j.itcon.2025.046","title":"Decentralized and Collaborative Information Management System in Construction Contract Administration: A change management case study","year":2025,"lang":"","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Smart contract; Ontology; Information management; Context (archaeology); Information system; Process (computing); Management information systems; Blockchain; Information security management","score_opus":0.005514737249226615,"score_gpt":0.23691177977933375,"score_spread":0.23139704253010715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128178412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89792955,0.0013587588,0.08206285,0.0012232683,0.0069889207,0.005440838,0.000053770433,0.00024773818,0.0046942863],"genre_scores_gemma":[0.97984236,0.0022410755,0.017609762,0.00004644659,0.0000398814,0.0001931167,0.00001439942,0.0000090367275,0.0000039036927],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9954258,0.00016795368,0.0034241644,0.00019689088,0.00041272497,0.00037244352],"domain_scores_gemma":[0.9971437,0.00005717273,0.0016460111,0.0002884895,0.0007814199,0.0000832441],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0009556151,0.00043653222,0.00070882856,0.00720743,0.00022158673,0.00035921476,0.00020580609,0.00060787756,0.000022885655],"category_scores_gemma":[0.000058439524,0.00047734557,0.00008312041,0.0035951335,0.00031841622,0.0064186463,0.000076506396,0.0008860144,0.000008051788],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052444084,0.00011611828,0.029671336,0.0011079223,0.00045781196,0.00051706925,0.0030236342,0.00045005477,0.000005163996,0.16899176,0.000033980723,0.7951007],"study_design_scores_gemma":[0.022969926,0.0010508128,0.020707915,0.00430893,0.00080711173,0.041771825,0.8764393,0.020132858,0.0009003293,0.003934979,0.006077133,0.00089891086],"about_ca_topic_score_codex":0.00005500808,"about_ca_topic_score_gemma":0.00016468715,"teacher_disagreement_score":0.87341565,"about_ca_system_score_codex":0.0013928128,"about_ca_system_score_gemma":0.00019171427,"threshold_uncertainty_score":0.99976784},"labels":[],"label_agreement":null},{"id":"W7133056146","doi":"","title":"Defining a value map for communication technologies in the Canadian construction industry","year":2007,"lang":"","type":"dissertation","venue":"TSpace","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Usability; Construction industry; Value (mathematics); Information technology; Industry 4.0","score_opus":0.0160409491152078,"score_gpt":0.3065002757996275,"score_spread":0.2904593266844197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133056146","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49973074,0.043049086,0.0174365,0.039113645,0.015560546,0.011783128,0.00030263318,0.0020164957,0.3710072],"genre_scores_gemma":[0.9833159,0.00030774676,0.013919925,0.000067898596,0.00008683337,0.00050376845,0.00094363285,0.000066286615,0.000788025],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9981242,0.00010116158,0.00061394693,0.00034555967,0.00026279772,0.00055234856],"domain_scores_gemma":[0.99838334,0.00036909868,0.0002741298,0.0006738802,0.00023154766,0.00006801766],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.00078999257,0.00042176063,0.00033235576,0.0009800396,0.000730828,0.00026623203,0.0005810458,0.0027183518,0.00008217415],"category_scores_gemma":[0.00026936718,0.0004146557,0.00010706356,0.0008228366,0.00022069427,0.00019886477,0.000015118157,0.0026667605,0.000039541497],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007197656,0.000024358547,0.0026518414,0.0004477789,0.000105737345,0.0000032033731,0.017802987,0.003246036,0.00024666006,0.81168205,0.0014612415,0.16225612],"study_design_scores_gemma":[0.001995973,0.00022511932,0.0068374095,0.0027960362,0.0004200595,0.0002149386,0.81544906,0.030207487,0.0070684734,0.048621804,0.08407302,0.002090606],"about_ca_topic_score_codex":0.09350006,"about_ca_topic_score_gemma":0.6559531,"teacher_disagreement_score":0.7976461,"about_ca_system_score_codex":0.00086864043,"about_ca_system_score_gemma":0.0005999169,"threshold_uncertainty_score":0.99983054},"labels":[],"label_agreement":null},{"id":"W7134389162","doi":"","title":"ICSC’15 : The CSCE International Construction Specialty Conference, Vancouver, June 7 - 10, 2015","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Specialty; Construction industry; Foundation (evidence)","score_opus":0.009659134947691678,"score_gpt":0.17028031797284857,"score_spread":0.16062118302515688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7134389162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8122189,0.0002679039,0.019950485,0.00046626636,0.013618104,0.0003433224,0.0003246024,0.00044002285,0.15237041],"genre_scores_gemma":[0.99298936,0.00009451974,0.0007240258,0.000014657631,0.00017035872,5.980021e-7,0.000027184957,0.000009353222,0.0059699616],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993402,0.000025559682,0.00011575435,0.00015326153,0.00024303397,0.000122187],"domain_scores_gemma":[0.99930286,0.000014249173,0.00006579065,0.00015395293,0.00037834403,0.00008480413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001128453,0.00004196471,0.00012793428,0.000039004084,0.000107563385,0.00009578312,0.00024407165,0.000092643306,0.0008516459],"category_scores_gemma":[0.00001854862,0.00011287323,0.000061635605,0.00017184904,0.00027044743,0.0003699932,0.000040990224,0.000140687,0.0000625678],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012608591,0.000023579545,0.0021823812,0.000013820173,0.00006724585,0.0000129572645,0.00022045155,0.00024812826,0.00006218588,0.00013721756,0.49464384,0.5023756],"study_design_scores_gemma":[0.0036036808,0.00009847024,0.47184053,0.00018820068,0.00011976757,0.00038062973,0.02114807,0.021586463,0.000020669979,0.008434159,0.47186378,0.0007155848],"about_ca_topic_score_codex":0.00733895,"about_ca_topic_score_gemma":0.36230075,"teacher_disagreement_score":0.50166,"about_ca_system_score_codex":0.00011320361,"about_ca_system_score_gemma":0.00008227612,"threshold_uncertainty_score":0.9992713},"labels":[],"label_agreement":null},{"id":"W7135408835","doi":"10.1201/9780367855192-8/towards-adopting-4d-bim-construction-management-curriculums-faris-elghaish-sepehr-abrishami-salam-al-bizri-saeed-talebi-sandra-matarneh-song-wu","title":"Towards adopting 4D BIM in construction management curriculums: A teaching map","year":2021,"lang":"en","type":"article","venue":"Research Portal (Queen's University Belfast)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Construction management; Scheduling (production processes); Building information modeling; Pre-construction services; Project planning; Process (computing)","score_opus":0.01245791760387935,"score_gpt":0.24963125825996,"score_spread":0.23717334065608064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7135408835","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7562392,0.00013347842,0.032633018,0.0016006979,0.001116765,0.00064177293,0.000044046457,0.00069784495,0.2068932],"genre_scores_gemma":[0.9861936,0.00022851881,0.011830154,0.000009655926,0.00009757187,0.0000038647486,0.000052310428,0.000021409101,0.0015628976],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983495,0.00019027041,0.00020015388,0.0003119254,0.0004941017,0.0004540402],"domain_scores_gemma":[0.9993906,0.0000336917,0.000030341966,0.00022793359,0.00018477236,0.00013268381],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042786394,0.00014676861,0.00016265636,0.0005903415,0.00033746313,0.00010223559,0.00017626627,0.0001248095,0.0003524969],"category_scores_gemma":[0.000033108106,0.00017803765,0.000079789126,0.00077085366,0.00013935866,0.0004303766,0.000153516,0.00086138054,0.00003911651],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003124886,0.00011650121,0.010746615,0.00036592016,0.0001697178,0.0023587777,0.0004396264,0.0029313625,0.00025716732,0.8432281,0.0028402803,0.1365147],"study_design_scores_gemma":[0.0068300003,0.00031563183,0.054834846,0.0023234072,0.00018841782,0.0005477384,0.2582373,0.030934034,0.0073745875,0.010418215,0.6252148,0.00278101],"about_ca_topic_score_codex":0.00047938252,"about_ca_topic_score_gemma":0.00009985658,"teacher_disagreement_score":0.83280987,"about_ca_system_score_codex":0.00036633844,"about_ca_system_score_gemma":0.0001195294,"threshold_uncertainty_score":0.72601646},"labels":[],"label_agreement":null},{"id":"W7154967786","doi":"10.66408/sasbe.2025.2630","title":"Evaluating the impact of public policies supporting digital transformation in the construction sector: towards a systematic evaluation framework","year":2025,"lang":"","type":"article","venue":"Proceedings of Smart and Sustainable Built Environment Conference Series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada; Ministère de l'Education Nationale, de l'Enseignement Superieur et de la Recherche; Association Nationale de la Recherche et de la Technologie","keywords":"Hindsight bias; Digital transformation; Novelty; Relevance (law); Plan (archaeology); Asset (computer security); Public policy; Policy analysis; Order (exchange)","score_opus":0.02879598537940971,"score_gpt":0.29179433788017944,"score_spread":0.26299835250076975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154967786","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9870891,0.0011728049,0.0033259816,0.0009828052,0.00009645003,0.0022420755,0.00001405212,0.000022837843,0.00505389],"genre_scores_gemma":[0.9987384,0.0005819103,0.00019452455,0.0000068922823,0.000027828683,0.00031865962,0.000009316795,0.000012802113,0.000109659675],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9972195,0.000099149045,0.0012564174,0.00026031406,0.00066469226,0.00049994385],"domain_scores_gemma":[0.9984455,0.00016895834,0.00059774687,0.00017351478,0.00057199463,0.00004225917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034601064,0.00034481322,0.00053368846,0.0003770538,0.00035737906,0.00070161326,0.0002927319,0.00021414412,0.000086360145],"category_scores_gemma":[0.00084759085,0.00023011211,0.00015534605,0.00064337807,0.0006372184,0.0022267061,0.000080638136,0.00037527143,5.994784e-7],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029327715,0.000173991,0.05286395,0.04256841,0.0006187358,4.6038915e-7,0.080420084,0.003043991,0.0044862754,0.72002155,0.000024378742,0.09548487],"study_design_scores_gemma":[0.000964465,0.0011496795,0.04072408,0.004672489,0.00061154866,0.00006228046,0.71847075,0.09982808,0.0049389466,0.12802956,0.000050180497,0.00049796025],"about_ca_topic_score_codex":0.00031871145,"about_ca_topic_score_gemma":0.000007481435,"teacher_disagreement_score":0.6380507,"about_ca_system_score_codex":0.00041539606,"about_ca_system_score_gemma":0.00045366585,"threshold_uncertainty_score":0.93837},"labels":[],"label_agreement":null},{"id":"W7164010638","doi":"10.5281/zenodo.20611807","title":"Cost Management Challenges in Indian Infrastructure Projects: A Study of Quantity Surveying Practices","year":2015,"lang":"en","type":"article","venue":"Open MIND","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Procurement; Mandate; Transparency (behavior); Government (linguistics); Integrated project delivery; Project management; Audit; Function (biology); Private sector","score_opus":0.21527014617506612,"score_gpt":0.35810336826380695,"score_spread":0.14283322208874083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7164010638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9763785,0.00014371291,0.000037262856,0.000021149457,0.00019068147,0.0007187663,0.0000035151024,0.0000036192748,0.022502821],"genre_scores_gemma":[0.99815744,0.00006104116,0.0016854935,0.0000011289252,0.000014253582,0.00004202287,0.0000036172194,0.000006702562,0.00002827592],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99942005,0.00006711031,0.0001781609,0.00013051946,0.00011869527,0.000085469735],"domain_scores_gemma":[0.99967104,0.000016849779,0.000096713586,0.00014664645,0.00003848314,0.000030285077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042586395,0.000074655356,0.00011902631,0.00011359141,0.000015263779,0.000062875384,0.00016956558,0.000042220276,0.00006220394],"category_scores_gemma":[0.000037361908,0.00006946667,0.0000075711737,0.00017483855,0.000010860676,0.00037555533,0.000055900913,0.00010793744,0.00001371533],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049842718,0.00017071009,0.10154664,0.000063691805,0.00008708664,0.000021105303,0.028251465,0.0026088313,0.00003851396,0.00011520137,0.00011354155,0.86693335],"study_design_scores_gemma":[0.0040867673,0.00044209682,0.38120756,0.00021663902,0.00006095984,0.00003132516,0.58486754,0.0039052635,0.0011837139,0.00019671074,0.023297526,0.00050388876],"about_ca_topic_score_codex":0.00031034718,"about_ca_topic_score_gemma":0.011020666,"teacher_disagreement_score":0.8664295,"about_ca_system_score_codex":0.000048052218,"about_ca_system_score_gemma":0.000023962648,"threshold_uncertainty_score":0.614979},"labels":[],"label_agreement":null},{"id":"W7164038547","doi":"10.5281/zenodo.20611808","title":"Cost Management Challenges in Indian Infrastructure Projects: A Study of Quantity Surveying Practices","year":2015,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Procurement; Mandate; Transparency (behavior); Government (linguistics); Integrated project delivery; Project management; Audit; Function (biology); Private sector","score_opus":0.14947333313135405,"score_gpt":0.29389542420868703,"score_spread":0.14442209107733298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7164038547","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9133782,0.00028310943,0.000935886,0.0001032601,0.00024111402,0.001136681,0.000034456327,0.000627077,0.083260246],"genre_scores_gemma":[0.99924004,0.00019860483,0.00017667831,0.0000039052397,0.000030167663,1.6784979e-7,0.00007593643,0.00025341194,0.000021069307],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99896234,0.0002432793,0.00021149694,0.00018393337,0.00024630746,0.00015266582],"domain_scores_gemma":[0.99937063,0.000011149887,0.0001043633,0.00022145399,0.00022653636,0.00006587666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006571115,0.000090013076,0.00010811009,0.00030153317,0.00018235993,0.00016115498,0.00031087114,0.000043460586,0.00031114157],"category_scores_gemma":[0.00023476373,0.000093508024,0.000012662555,0.00045484185,0.000035440593,0.00030969369,0.00018857596,0.00019593281,0.00016788492],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015445257,0.0005438287,0.0019315315,0.000549963,0.0001943719,0.00004424626,0.044234842,0.0060539227,0.00040223825,0.005790123,0.013768328,0.9263322],"study_design_scores_gemma":[0.004086362,0.0010708144,0.08818462,0.00018872079,0.000048593596,0.00018231622,0.20956469,0.006343238,0.00041690448,0.00047510577,0.6888138,0.0006248506],"about_ca_topic_score_codex":0.000051769784,"about_ca_topic_score_gemma":0.00003473968,"teacher_disagreement_score":0.9257073,"about_ca_system_score_codex":0.0001232004,"about_ca_system_score_gemma":0.0000025412792,"threshold_uncertainty_score":0.38131467},"labels":[],"label_agreement":null},{"id":"W755791061","doi":"","title":"MJM ACOUSTICAL CONSULTANTS INC.","year":2015,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variety (cybernetics); Engineering; Telecommunications; Engineering management; Business; Computer science; Artificial intelligence","score_opus":0.01599763348686804,"score_gpt":0.204398899142538,"score_spread":0.18840126565566997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W755791061","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38021684,0.0011456843,0.3156457,0.0006526607,0.014043574,0.00052103924,0.001007728,0.0014625019,0.2853043],"genre_scores_gemma":[0.9975765,0.000013001533,0.0016191727,0.0002043793,0.0002062334,0.0000050385574,0.000025923473,0.00001977045,0.00033000353],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994555,0.000006774524,0.00012057164,0.00008051698,0.000095934876,0.00024068296],"domain_scores_gemma":[0.99904597,0.000017908467,0.00000799073,0.00012105998,0.00018552877,0.0006215661],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00004876438,0.000092450915,0.000082122875,0.00009948755,0.000040890627,0.000038321235,0.00007775576,0.00011965679,0.00014050206],"category_scores_gemma":[0.00014373183,0.000098845194,0.000010708387,0.0001770994,0.000056996683,0.00005639432,0.0000043394816,0.00014909996,0.00033911061],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009558189,0.000012773162,0.0017793379,0.00005233955,0.00008004246,0.00017415924,0.00053243816,0.061645016,0.011630443,0.017540006,0.80242276,0.104121126],"study_design_scores_gemma":[0.00072189263,0.00004587412,0.0039076046,0.000027121594,0.000075958225,0.00019226655,0.0014093792,0.8556657,0.0003004515,0.002240612,0.13480899,0.000604171],"about_ca_topic_score_codex":0.0018573973,"about_ca_topic_score_gemma":0.0054049357,"teacher_disagreement_score":0.79402065,"about_ca_system_score_codex":0.00028022486,"about_ca_system_score_gemma":0.00043469688,"threshold_uncertainty_score":0.4358694},"labels":[],"label_agreement":null},{"id":"W765355923","doi":"","title":"Topping it up down in NOLA","year":2015,"lang":"en","type":"article","venue":"Roads & bridges/Roads & bridges (Des Plaines, Ill. Online)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Downtown; Tourism; Quarter (Canadian coin); Engineering; Overlay; Civil engineering; Hospitality; Topping; Waterfall; Forensic engineering; Business; Transport engineering; Geography; Archaeology; Computer science","score_opus":0.03018245851670254,"score_gpt":0.2524007889396691,"score_spread":0.22221833042296657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W765355923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9761977,0.0029667083,0.006847677,0.0016288995,0.004448504,0.0005693568,0.00026385824,0.0013472735,0.005729991],"genre_scores_gemma":[0.9915512,0.0008840111,0.0018343094,0.0006566478,0.0015938075,0.00007258131,0.00072532473,0.00017736903,0.0025047036],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99607176,0.00012945509,0.0012215612,0.0008109232,0.00068123353,0.0010850687],"domain_scores_gemma":[0.9977936,0.00012323188,0.00017916359,0.00079297525,0.00061433186,0.00049669296],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0005613776,0.0008054068,0.00081719056,0.00067060307,0.00020565838,0.0002758755,0.00065131485,0.0004920314,0.00014338059],"category_scores_gemma":[0.00040103315,0.000842118,0.0002473035,0.0011669996,0.00025657337,0.0009103752,0.00015191398,0.0008936882,0.00028860098],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038582634,0.0007833427,0.13127923,0.0006860049,0.0005113218,0.0004274024,0.00571483,0.10579849,0.009322563,0.0051213466,0.14926457,0.59070504],"study_design_scores_gemma":[0.0074831625,0.00039631448,0.27034608,0.0013499728,0.00025572366,0.0018016542,0.006281141,0.24015869,0.008224067,0.0008056143,0.4586218,0.0042757993],"about_ca_topic_score_codex":0.0014656502,"about_ca_topic_score_gemma":0.0020699198,"teacher_disagreement_score":0.58642924,"about_ca_system_score_codex":0.0007908748,"about_ca_system_score_gemma":0.00023484015,"threshold_uncertainty_score":0.99940294},"labels":[],"label_agreement":null},{"id":"W803883628","doi":"","title":"On-site labor productivity estimation using neural networks","year":2005,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Productivity; Sampling (signal processing); Engineering; Estimation; Work (physics); Software; Field (mathematics); Industrial engineering; Computer science; Operations research; Data mining; Machine learning; Telecommunications; Systems engineering; Mathematics; Economics","score_opus":0.015707014620038234,"score_gpt":0.25530611182818647,"score_spread":0.23959909720814823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W803883628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94099754,0.00021305234,0.00074385555,0.000054674358,0.002804454,0.0004604034,0.000014428792,0.00037660674,0.054334965],"genre_scores_gemma":[0.9864973,0.000062226776,0.00006333595,0.0000031239615,0.0009882266,0.0000047332205,0.0001822108,0.00007287872,0.012125971],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99776393,0.000258564,0.00025843875,0.0005603807,0.0005790829,0.00057958276],"domain_scores_gemma":[0.99883485,0.00010940543,0.00010740921,0.00048997655,0.00027269233,0.00018565515],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.00023355524,0.00034530088,0.0003146041,0.0011381865,0.0006000979,0.00019186953,0.00031629647,0.000453101,0.00006156079],"category_scores_gemma":[0.00004064045,0.00041141696,0.0001523794,0.0011962738,0.000125152,0.00053446996,0.000030741503,0.001631974,0.000029986908],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010834313,0.00016770174,0.0074645635,0.00047774258,0.00045057203,0.0004369467,0.00071801135,0.91308874,0.011100603,0.01850084,0.0026530088,0.04385787],"study_design_scores_gemma":[0.000538137,0.00019587365,0.024698567,0.0002231987,0.00010605287,0.000053293643,0.00068535376,0.95320046,0.014523801,0.00033208475,0.004676305,0.0007668764],"about_ca_topic_score_codex":0.0012487358,"about_ca_topic_score_gemma":0.007935485,"teacher_disagreement_score":0.045499735,"about_ca_system_score_codex":0.0011789779,"about_ca_system_score_gemma":0.00025362617,"threshold_uncertainty_score":0.99983376},"labels":[],"label_agreement":null},{"id":"W817391689","doi":"","title":"The use of cemented scrap tire shreds as highway sub-base","year":2006,"lang":"en","type":"article","venue":"Canadian Geotechnical Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scrap; Geotechnical engineering; Base (topology); Road construction; Forensic engineering; Geology; Engineering; Mining engineering; Civil engineering; Mathematics","score_opus":0.012643443288493568,"score_gpt":0.18793380865781922,"score_spread":0.17529036536932566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W817391689","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9517011,0.0025165733,0.027954288,0.007094829,0.0037504935,0.0005060006,0.00014577461,0.00048914115,0.005841791],"genre_scores_gemma":[0.99927026,0.000079896214,0.00013074491,0.00010201238,0.00017206407,0.0000040618716,0.0000062973963,0.000014974328,0.00021966317],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99922574,0.00002228903,0.00029260115,0.00006538352,0.0001454559,0.00024855242],"domain_scores_gemma":[0.99944365,0.00003728712,0.000045042998,0.00014876064,0.00009909923,0.00022613686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001104745,0.0000911199,0.00008894026,0.00013205728,0.00020713807,0.000101929516,0.0001372533,0.0001128543,0.00011888347],"category_scores_gemma":[0.0000359077,0.00007020957,0.000076829376,0.0001791696,0.00009615264,0.00011278039,0.0000051019615,0.00036845656,0.0000208053],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037903075,0.000030704065,0.0010561579,0.000022622511,0.0001463279,0.00018054512,0.000030667863,0.11764021,0.017713137,0.064036444,0.37178546,0.42731982],"study_design_scores_gemma":[0.00045240985,0.00007519921,0.0041315667,0.00007795494,0.00003717415,0.00064900174,0.000046552326,0.06211635,0.007041302,0.0023379973,0.9227787,0.00025578903],"about_ca_topic_score_codex":0.009011788,"about_ca_topic_score_gemma":0.024875393,"teacher_disagreement_score":0.55099326,"about_ca_system_score_codex":0.00021829501,"about_ca_system_score_gemma":0.00020114788,"threshold_uncertainty_score":0.99758726},"labels":[],"label_agreement":null},{"id":"W818459361","doi":"","title":"Paying for It: Cost to be a Contractor","year":2007,"lang":"en","type":"article","venue":"Roads & bridges/Roads & bridges (Des Plaines, Ill. Online)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic shortage; Bidding; Quarter (Canadian coin); Truck; Operations management; Business; Cost estimate; Economics; Engineering; Actuarial science; Marketing; Government (linguistics)","score_opus":0.029574928567889243,"score_gpt":0.27794362697495856,"score_spread":0.24836869840706932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W818459361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75694215,0.0016269869,0.22548132,0.0037425573,0.0041421764,0.002283531,0.0018317937,0.0016763099,0.0022731493],"genre_scores_gemma":[0.97930115,0.00040281424,0.009968521,0.003855413,0.0028339846,0.00027408364,0.0011910507,0.00027571913,0.0018972522],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957906,0.00004946133,0.0013150574,0.0008601477,0.00052515685,0.0014596058],"domain_scores_gemma":[0.99720883,0.00044401357,0.00020219137,0.00071170373,0.00077116565,0.0006620814],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0007951812,0.00085532607,0.00084152573,0.00056282495,0.00046339032,0.0002775023,0.00057237304,0.00047150764,0.0001300552],"category_scores_gemma":[0.00052734243,0.00087993575,0.0004251746,0.0007414768,0.00019655339,0.000596089,0.00008848492,0.00059908436,0.00010013519],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00077103457,0.00048116033,0.00712994,0.0004839572,0.00048972765,0.00010473761,0.001734762,0.012031048,0.03122028,0.0049484903,0.107126884,0.833478],"study_design_scores_gemma":[0.0028881081,0.00033007006,0.06194273,0.00031696138,0.00022143533,0.00041789352,0.0018276129,0.043521162,0.015269676,0.00014985331,0.87117726,0.0019372299],"about_ca_topic_score_codex":0.000421679,"about_ca_topic_score_gemma":0.0026022627,"teacher_disagreement_score":0.83154076,"about_ca_system_score_codex":0.0006242346,"about_ca_system_score_gemma":0.00012827701,"threshold_uncertainty_score":0.99936515},"labels":[],"label_agreement":null},{"id":"W850345497","doi":"","title":"MJM CONSEILLERS EN ACOUSTIQUE INC.","year":2015,"lang":"fr","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.013172365155097133,"score_gpt":0.2072017119196931,"score_spread":0.194029346764596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W850345497","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15996392,0.029739277,0.35479656,0.028430918,0.08480016,0.0013007338,0.003643302,0.0009884235,0.3363367],"genre_scores_gemma":[0.9743492,0.000462093,0.007485826,0.00089396175,0.0013460772,0.000015295958,0.00007962237,0.0000772044,0.015290743],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987578,0.00006008246,0.00027477727,0.00019448035,0.0001537099,0.000559187],"domain_scores_gemma":[0.99799055,0.00006278047,0.000037431495,0.0002547356,0.00028016546,0.0013743626],"candidate_categories":["metaepi_narrow","insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00018267543,0.0002446249,0.00019574759,0.00024112171,0.000093000905,0.00010129526,0.00017127303,0.00052398717,0.0007485816],"category_scores_gemma":[0.0002208187,0.0003089207,0.00004738816,0.00024876508,0.00018222451,0.00015498456,0.000013877775,0.0005013395,0.0010273332],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005350159,0.000010469217,0.00044561113,0.00010629949,0.00010310921,0.00020138621,0.0015927796,0.12232941,0.0016225007,0.032121915,0.7664823,0.07497889],"study_design_scores_gemma":[0.0005650671,0.000070363574,0.001434288,0.00011503348,0.00016406199,0.00039190488,0.0047926614,0.23593329,0.00013065238,0.0031131564,0.75260675,0.00068278925],"about_ca_topic_score_codex":0.09987749,"about_ca_topic_score_gemma":0.07341561,"teacher_disagreement_score":0.81438524,"about_ca_system_score_codex":0.0019608208,"about_ca_system_score_gemma":0.0029283126,"threshold_uncertainty_score":0.9999363},"labels":[],"label_agreement":null},{"id":"W850660147","doi":"","title":"TTC STREAMLINES M/W PLANNING","year":2002,"lang":"en","type":"article","venue":"Railway track and structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Track (disk drive); Work (physics); Software; Commission; Work order; Transport engineering; Engineering; Order (exchange); Transit (satellite); Computer science; Software engineering; Engineering management; Systems engineering; Reliability engineering; Business; Public transport; Operating system","score_opus":0.013470655638491237,"score_gpt":0.21053864649934587,"score_spread":0.19706799086085464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W850660147","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97636485,0.0046258294,0.00088965584,0.000058267935,0.00053773384,0.000051840547,0.000010926282,0.00031431453,0.017146576],"genre_scores_gemma":[0.9987975,0.00013421175,0.0005689593,0.000030218614,0.00018871317,0.0000032314288,0.000004208671,0.000011066474,0.0002618882],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996093,0.000005815957,0.00010915117,0.000096878655,0.00006480922,0.000114055896],"domain_scores_gemma":[0.99983996,0.000015910022,0.000011830127,0.00007320203,0.00001367439,0.00004541334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0000137254165,0.00010378679,0.00008925774,0.000049480706,0.00007169752,0.000047275647,0.000038700782,0.00007028902,0.00039513782],"category_scores_gemma":[0.0000056911695,0.000086437765,0.000024299303,0.00005630582,0.000033952663,0.00009555063,0.000003820136,0.000105916704,0.000008256376],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010695927,0.000010197216,0.008700431,0.00010245945,0.00009322365,0.000014106392,0.0024724924,0.008675804,0.006591734,0.027645137,0.018704178,0.92697954],"study_design_scores_gemma":[0.0032068114,0.0002596193,0.2599527,0.00019077082,0.00016915172,0.0009776431,0.0030545217,0.28152788,0.044463724,0.060782984,0.3429136,0.0025005995],"about_ca_topic_score_codex":0.0000030014212,"about_ca_topic_score_gemma":0.000005064408,"teacher_disagreement_score":0.92447895,"about_ca_system_score_codex":0.000006150539,"about_ca_system_score_gemma":0.0000012100112,"threshold_uncertainty_score":0.43264818},"labels":[],"label_agreement":null},{"id":"W852836758","doi":"10.1044/leader.an1.17062012.1","title":"ASHA Members: 150,000 Strong and Growing","year":2012,"lang":"en","type":"article","venue":"ASHA Leader","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Asha; American Speech-Language-Hearing Association; Population; Psychological intervention; Psychology; Medical education; Medicine; Political science; Linguistics; Environmental health; Psychiatry","score_opus":0.01717456596533274,"score_gpt":0.22009314586421852,"score_spread":0.2029185798988858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W852836758","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91259015,0.0038669258,0.008983075,0.00040533365,0.005527066,0.00016255082,0.000009301449,0.00068474666,0.06777083],"genre_scores_gemma":[0.9982358,0.000014921161,0.0005989266,0.000082813305,0.00041601906,0.000008548178,0.000004267782,0.000016370115,0.0006222823],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995722,0.000008478177,0.00009202258,0.000068962465,0.000070036745,0.00018828857],"domain_scores_gemma":[0.99981874,0.000014798103,0.000009775963,0.00007964868,0.0000148502695,0.00006217385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000052556046,0.00008244231,0.00006926344,0.00003964948,0.000039668597,0.000028355198,0.000031660664,0.00006485506,0.00046255693],"category_scores_gemma":[0.000007504809,0.00007914276,0.000021785794,0.00005722546,0.000025432282,0.0005224896,0.000007582117,0.00011726126,0.00008540702],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019603604,0.00007644317,0.12149548,0.0003595692,0.00045939462,0.000005261882,0.011761892,0.0031105059,0.028081842,0.0853073,0.092289455,0.65703326],"study_design_scores_gemma":[0.0018169302,0.00007274452,0.09299974,0.0002280998,0.00020016816,0.00022800021,0.017923875,0.037529215,0.032090463,0.0009446615,0.81421673,0.0017493638],"about_ca_topic_score_codex":0.000014817686,"about_ca_topic_score_gemma":0.000006586661,"teacher_disagreement_score":0.7219273,"about_ca_system_score_codex":0.000020295447,"about_ca_system_score_gemma":0.0000026571804,"threshold_uncertainty_score":0.5064674},"labels":[],"label_agreement":null},{"id":"W89732604","doi":"10.22260/isarc2013/0086","title":"Impact of Building Information Modeling on Just-in-Time Material Delivery","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Material flow; Computer science; Materials management; Building information modeling; Delivery Performance; Scheduling (production processes); Productivity; Process (computing); Manufacturing engineering; Reliability engineering; Process management; Operations management; Engineering","score_opus":0.006797903422808936,"score_gpt":0.19939720260744584,"score_spread":0.1925992991846369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W89732604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9960642,0.0000053140993,0.000097165386,0.000019644855,0.00015477982,0.00014391981,0.0000057239117,0.0000416846,0.0034675759],"genre_scores_gemma":[0.99949914,0.0000068965333,0.00041988736,0.0000069874523,0.00003773461,0.000010950864,0.0000011508542,0.0000075960647,0.000009629684],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994482,0.0000014435046,0.00025798014,0.00004609912,0.00014010638,0.00010618711],"domain_scores_gemma":[0.9997214,0.0000063117745,0.000070328955,0.00004482567,0.00013923724,0.000017916447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007400518,0.00008364219,0.00010910407,0.00012212576,0.000020206639,0.00004025299,0.00014633521,0.000058055375,0.00008534374],"category_scores_gemma":[0.000020024874,0.00006032133,0.000065622735,0.00013329796,0.000017676997,0.0006918961,0.000024029838,0.00008331683,0.000014119405],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000080558784,0.000028453329,0.0072434414,0.00026167967,0.000059313123,1.8322684e-8,0.0012618348,0.0973771,0.873419,0.0035496578,0.0014114736,0.015307494],"study_design_scores_gemma":[0.00036208896,0.00007131336,0.0059928186,0.000256132,0.000015791782,0.0000056424533,0.0003408926,0.8259854,0.16452669,0.0022627218,0.000019051051,0.00016147477],"about_ca_topic_score_codex":0.00013547833,"about_ca_topic_score_gemma":2.9433656e-7,"teacher_disagreement_score":0.7286083,"about_ca_system_score_codex":0.00007004675,"about_ca_system_score_gemma":0.0000085460015,"threshold_uncertainty_score":0.24598324},"labels":[],"label_agreement":null},{"id":"W92521098","doi":"","title":"Preventing Foreign Object Debris and Improving Pavement Life-Cycle Costs Through Effective Fast-Track Concrete Repair","year":2007,"lang":"en","type":"article","venue":"Transportation Research Board 86th Annual MeetingTransportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Product (mathematics); Track (disk drive); Runway; Transport engineering; Engineering; Forensic engineering; Environmental science; Civil engineering; Geography; Mathematics","score_opus":0.018014739981929366,"score_gpt":0.31210510972536,"score_spread":0.2940903697434306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W92521098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97119117,0.0010300761,0.016588282,0.000212931,0.00033693473,0.0032100987,0.0002424643,0.0010262078,0.0061618285],"genre_scores_gemma":[0.99109286,0.00045544724,0.006675936,0.00007568828,0.0003283923,0.000648002,0.00026036846,0.00014885435,0.00031442218],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99180555,0.0006115242,0.0015146908,0.0011333941,0.0029377488,0.0019970643],"domain_scores_gemma":[0.99450827,0.0015388244,0.0001884981,0.0005109983,0.0024776063,0.00077581254],"candidate_categories":["metaepi_narrow"],"consensus_categories":[],"category_scores_codex":[0.0071552075,0.00055102113,0.00058653497,0.0010181967,0.0011081628,0.00024741763,0.00038316232,0.00048056792,0.00021983244],"category_scores_gemma":[0.00044264214,0.000583067,0.0002887268,0.0018792509,0.0007676652,0.0014076707,0.000017764874,0.002116282,0.000052737636],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0056613963,0.0004785058,0.3133862,0.00909349,0.0023284934,0.000996573,0.1115111,0.013653849,0.1037462,0.07869722,0.011436862,0.3490101],"study_design_scores_gemma":[0.0064723375,0.0021577554,0.78481406,0.0013720774,0.0002371764,0.000008661124,0.08703873,0.015799746,0.072915085,0.003498577,0.023437973,0.0022478062],"about_ca_topic_score_codex":0.006537809,"about_ca_topic_score_gemma":0.009358387,"teacher_disagreement_score":0.4714279,"about_ca_system_score_codex":0.00047639987,"about_ca_system_score_gemma":0.0002705105,"threshold_uncertainty_score":0.9996621},"labels":[],"label_agreement":null},{"id":"W93545470","doi":"10.22260/isarc2013/0105","title":"Surveying BIM in the Lebanese Construction Industry","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Work (physics); Construction industry; Productivity; Engineering management; Engineering; Business; Construction engineering; Operations management","score_opus":0.009791153595248936,"score_gpt":0.19120088503349825,"score_spread":0.18140973143824932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W93545470","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98077804,0.000049553444,0.000020948299,0.00048227914,0.0003473693,0.00018720193,0.0000013097667,0.000053423322,0.01807988],"genre_scores_gemma":[0.9995351,0.000008591422,0.00022265964,0.000043197077,0.00007661046,0.000038212955,4.2094e-7,0.000009342863,0.00006589254],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99944687,0.000007293828,0.00018853284,0.00008128895,0.00015032505,0.00012566756],"domain_scores_gemma":[0.99973553,0.00002646914,0.00005315572,0.00007035178,0.00009828195,0.000016236992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020239626,0.00008680321,0.000085959946,0.00006595877,0.000053614993,0.000058549584,0.00023691142,0.00012605477,0.00007973725],"category_scores_gemma":[0.000050620667,0.000052568354,0.00003941641,0.0003506398,0.00008971453,0.00028950293,0.000021200296,0.00039072894,0.000013293307],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013371925,0.00004938866,0.7243314,0.00030027356,0.00006385015,2.4174668e-7,0.004457568,0.0004633579,0.10056384,0.070121676,0.011994739,0.08764033],"study_design_scores_gemma":[0.0011085735,0.000062149615,0.7713304,0.0004454321,0.000056274454,0.000299623,0.041477438,0.013400652,0.10914506,0.057905946,0.0040474716,0.0007209377],"about_ca_topic_score_codex":0.00011366394,"about_ca_topic_score_gemma":0.0000120988725,"teacher_disagreement_score":0.0869194,"about_ca_system_score_codex":0.000030109213,"about_ca_system_score_gemma":0.000008189151,"threshold_uncertainty_score":0.21436752},"labels":[],"label_agreement":null},{"id":"W958625388","doi":"","title":"Editorial: special issue on use of virtual world technology in architecture, engineering and construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Metaverse; Virtual world; Architecture; Virtual reality; Dominance (genetics); Visualization; Computer science; Engineering; World Wide Web; Multimedia; Human–computer interaction; Geography","score_opus":0.003383589176464001,"score_gpt":0.18733492069947855,"score_spread":0.18395133152301454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W958625388","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010732638,0.00008107856,0.0033389905,0.000110338144,0.9848836,0.0002666006,0.00005147206,0.0001678653,0.00036739],"genre_scores_gemma":[0.009255035,0.0012539227,0.021576218,0.000007230609,0.9677513,0.000028888348,0.000050756447,0.000059401984,0.000017213459],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972836,0.000030412028,0.0018163245,0.0001540862,0.00045824717,0.000257353],"domain_scores_gemma":[0.9979317,0.00019713424,0.0010516153,0.00022916457,0.00054300996,0.000047362897],"candidate_categories":["metaepi_narrow","research_integrity"],"consensus_categories":["research_integrity"],"category_scores_codex":[0.00032191558,0.00036463919,0.00072039675,0.010509004,0.000034809666,0.00005322135,0.0002395646,0.0020840238,0.00003812961],"category_scores_gemma":[0.0009344977,0.00037954331,0.00008570115,0.0015888757,0.00042102984,0.001144936,0.00004257883,0.0029182048,0.0000061593173],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043244852,0.000041246247,0.0011341635,0.00027003876,0.00016891975,0.000007890033,0.0003608141,0.009022586,0.00043348045,0.033661,0.37278762,0.58167976],"study_design_scores_gemma":[0.0018242846,0.0004429996,0.00007260589,0.0010747155,0.000054193733,0.00037672598,0.0007453191,0.0006287964,0.0072482876,0.0097544165,0.9773202,0.0004574813],"about_ca_topic_score_codex":0.000015254199,"about_ca_topic_score_gemma":0.000050466748,"teacher_disagreement_score":0.60453254,"about_ca_system_score_codex":0.00038443663,"about_ca_system_score_gemma":0.00017482124,"threshold_uncertainty_score":0.99986565},"labels":[],"label_agreement":null},{"id":"W967810751","doi":"","title":"Truck+ for earthmoving operations","year":2014,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Truck; Global Positioning System; Interface (matter); Graphical user interface; Application programming interface; Geographic information system; Software; Component Object Model; User interface; Engineering; Tracking system; Computer science; Web application; Database; World Wide Web; Operating system; Automotive engineering","score_opus":0.0032874263430774527,"score_gpt":0.1929169950006865,"score_spread":0.18962956865760902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W967810751","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21369278,0.000034955934,0.7831827,0.00049868476,0.0013225653,0.00011672434,0.0000030384872,0.0001112587,0.0010373014],"genre_scores_gemma":[0.9375508,0.000033625507,0.0622816,0.000031565447,0.000080269034,0.000009933534,0.0000039341403,0.0000047266426,0.0000035661494],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991848,0.000009645236,0.0005995947,0.000030958658,0.00007997191,0.00009506086],"domain_scores_gemma":[0.99950033,0.000027908407,0.00012698123,0.00007508103,0.00024922748,0.000020472318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023356939,0.0000717581,0.00013251604,0.0009898375,0.000056121906,0.000038370115,0.000084332154,0.00016634329,0.000016231961],"category_scores_gemma":[0.00017772011,0.000069531,0.00004499898,0.0003267656,0.000063481864,0.0011283633,0.0000046993705,0.00021219188,0.000006838923],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014074699,0.0000045108914,0.002096353,0.000026224412,0.000018964423,1.1405518e-7,0.00014114144,0.024824835,0.0016998199,0.19839332,0.00023184357,0.7725488],"study_design_scores_gemma":[0.005621407,0.0006272883,0.004288563,0.00031482565,0.000070458744,0.0032245822,0.006769409,0.62656873,0.13338305,0.13906178,0.07939798,0.00067191024],"about_ca_topic_score_codex":9.866408e-7,"about_ca_topic_score_gemma":0.000008244273,"teacher_disagreement_score":0.7718769,"about_ca_system_score_codex":0.00007307665,"about_ca_system_score_gemma":0.0000304142,"threshold_uncertainty_score":0.28353918},"labels":[],"label_agreement":null},{"id":"W970775266","doi":"","title":"The Role of Identity in Adopting Building Information Modeling: A Comparative Study","year":2015,"lang":"en","type":"article","venue":"Americas Conference on Information Systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski; Université du Québec à Montréal","funders":"","keywords":"Building information modeling; Identity (music); Resistance (ecology); Construction industry; Knowledge management; Business; Work (physics); Marketing; Computer science; Engineering; Operations management; Construction engineering; Mechanical engineering","score_opus":0.05047523650699411,"score_gpt":0.29570312668684434,"score_spread":0.24522789017985022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W970775266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83288705,0.00008317322,0.124450356,0.00001623995,0.0006732652,0.00073069846,0.000008620369,0.00014942198,0.041001193],"genre_scores_gemma":[0.99973154,0.000013796685,0.00012521658,0.000006543137,0.000015975318,0.00009278664,0.000009167221,0.00000279915,0.0000021773028],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986958,0.000060275994,0.0007279955,0.000044531847,0.00034591008,0.00012549272],"domain_scores_gemma":[0.999126,0.00003509575,0.00022982771,0.00015449579,0.0004100326,0.000044558077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004405784,0.000109822104,0.00018313118,0.00019991871,0.00006903483,0.00024859267,0.00014948941,0.000041477495,0.0000016593776],"category_scores_gemma":[0.000047043603,0.00008694413,0.000022715962,0.00039521395,0.00003260797,0.0032267456,0.000017574941,0.00012748316,0.00004607418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046066,0.000021976359,0.0022222819,0.0000313203,0.00003667251,9.405217e-8,0.03677123,0.74431324,0.000050788793,0.16323932,0.000048143975,0.05321888],"study_design_scores_gemma":[0.00026203904,0.000067815214,0.0001914691,0.00004115627,0.0000033663425,0.0000026873133,0.17817487,0.819225,0.000058623515,0.00017743638,0.0017105995,0.000084920306],"about_ca_topic_score_codex":0.0004138266,"about_ca_topic_score_gemma":0.000047283003,"teacher_disagreement_score":0.1668445,"about_ca_system_score_codex":0.00010580131,"about_ca_system_score_gemma":0.000047768215,"threshold_uncertainty_score":0.35454786},"labels":[],"label_agreement":null},{"id":"W972340795","doi":"10.11575/prism/26853","title":"Measuring a Design Process","year":2014,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.012590698413327897,"score_gpt":0.17818654935799752,"score_spread":0.1655958509446696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W972340795","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05651943,0.0003248654,0.8626846,0.000007064737,0.000591567,0.00019357081,2.5362425e-7,0.00025174802,0.07942688],"genre_scores_gemma":[0.932681,0.0003677451,0.048677556,0.000010267925,0.000084274354,0.000004063447,0.00030454012,0.00010637218,0.017764183],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948406,0.000019683892,0.00009467808,0.00012955412,0.00016801442,0.0001039877],"domain_scores_gemma":[0.99966156,0.000014433013,0.00007240944,0.0001166417,0.00008993156,0.000045039244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000063250176,0.00013057307,0.00019243092,0.00016247833,0.000067972716,0.000008542395,0.00016102039,0.00023617304,0.00013192905],"category_scores_gemma":[0.0000074747186,0.00017263374,0.000076589095,0.00009126267,0.000022008102,0.00011150368,0.00000430857,0.00021061665,0.00003385848],"study_design_candidate":"design_other","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104306964,0.000018474053,0.00006247083,0.0009810784,0.00017209539,0.000007358647,0.0035364777,0.00023589612,0.0019995016,0.0014723056,0.0020256462,0.9893844],"study_design_scores_gemma":[0.002414861,0.0002772319,0.010039819,0.0017149333,0.00089902757,0.000022348491,0.0032635913,0.89859354,0.03936982,0.009030018,0.03201227,0.0023625393],"about_ca_topic_score_codex":0.000056159293,"about_ca_topic_score_gemma":0.00002647362,"teacher_disagreement_score":0.98702186,"about_ca_system_score_codex":0.000041360803,"about_ca_system_score_gemma":0.000046888385,"threshold_uncertainty_score":0.7039799},"labels":[],"label_agreement":null},{"id":"W979672916","doi":"","title":"Annual Conference of the Canadian Society for Civil Engineering 2013 : Know-How--Savoir-Faire : Montreal, Canada 29 May-1 June 2013","year":2015,"lang":"en","type":"book","venue":"Medical Entomology and Zoology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Library science; Media studies; History; Public administration; Sociology; Computer science","score_opus":0.008182048980130224,"score_gpt":0.18798787182358925,"score_spread":0.17980582284345903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W979672916","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"codex-gemma-dda1882f352a","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029334366,0.117553696,0.029993735,0.27766386,0.13854723,0.008759113,0.015758371,0.0015473812,0.38084224],"genre_scores_gemma":[0.36944214,0.0030572698,0.000422117,0.0015101281,0.0013837346,0.00033006177,0.00078546547,0.00016489826,0.6229042],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99873775,0.000036068977,0.00030986755,0.00025269773,0.00024260882,0.00042100585],"domain_scores_gemma":[0.9989185,0.00016872208,0.000085074375,0.00021254564,0.00024343308,0.000371723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021876575,0.0002783356,0.0004879047,0.00007603663,0.00009622894,0.000009141592,0.0002980124,0.0012964708,0.00037772616],"category_scores_gemma":[0.00012892384,0.00022522344,0.00012078468,0.00005721613,0.0004663815,0.000043958487,0.000052116644,0.0007773664,0.000002385364],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067394412,0.0000043740674,0.00010066299,0.00016202568,0.00022066566,0.000013339654,0.0003655286,0.00012906682,0.0000023414098,0.0076417234,0.9843798,0.006973705],"study_design_scores_gemma":[0.0006696234,0.0000695989,0.00031842527,0.00014005126,0.00014302612,0.00030790604,0.00018426676,0.018490938,0.000013969632,0.00529221,0.9740009,0.00036909585],"about_ca_topic_score_codex":0.7169792,"about_ca_topic_score_gemma":0.99868345,"teacher_disagreement_score":0.34010777,"about_ca_system_score_codex":0.00039724543,"about_ca_system_score_gemma":0.0044485703,"threshold_uncertainty_score":0.99995697},"labels":[],"label_agreement":null}]}