{"meta":{"query_hash":"884bc0837e4c","filters":{"topic":"BIM and Construction Integration"},"cohort_total":1860,"direct_labels_cover":5,"predictions_cover":1860,"exported":1860,"export_cap":100000,"truncated":false,"label_status":"direct model label, unvalidated","prediction_status":"machine_predicted_unvalidated (Codex and Gemma teacher distillation)","score_status":"score_only:v0-immature-baseline","snapshot":{"source":"OpenAlex, pinned release, all 482 partitions","release":"2026-06-24","frame_built":"2026-07-12"},"permalink":"https://metacan.xera.ac/q/884bc0837e4c","api":"https://metacan.xera.ac/api/v1/cohort?topic=BIM+and+Construction+Integration"},"results":[{"id":"W101405778","doi":"10.1061/41020(339)52","title":"Querying IFC-Based Building Information Models to Support Construction Management Functions","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Computer science; Information model; Ontology; Feature (linguistics); Product (mathematics); Software engineering; Domain (mathematical analysis); Systems engineering; Function (biology); Engineering","score_opus":0.03556985509435197,"score_gpt":0.29645613727687814,"score_spread":0.2608862821825262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W101405778","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04172287,0.0003424449,0.8971467,0.0016672417,0.00009689705,0.0005321146,0.009637277,0.023253452,0.025600912],"genre_scores_gemma":[0.3708238,0.0004270239,0.5972163,0.00042013815,0.00004170386,0.00073168793,0.025161013,0.0019703438,0.0032080351],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99015826,0.002027535,0.0011328658,0.00080656237,0.005365815,0.0005089075],"domain_scores_gemma":[0.9852143,0.0049792277,0.0008240644,0.0052138777,0.0034811168,0.00028745984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0070101456,0.0013777988,0.0016175807,0.0077282363,0.0013422807,0.007266302,0.003274145,0.0028476096,0.0048740897],"category_scores_gemma":[0.026236864,0.0010663357,0.0024249582,0.0053896876,0.0015557662,0.0074451305,0.0038604562,0.0018571102,0.001972378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045320397,0.0007616745,0.016484901,0.0011423702,0.00027738753,0.002127441,0.006522199,0.37701944,0.018975068,0.37618038,0.043395866,0.15666],"study_design_scores_gemma":[0.00006545162,0.000054415825,0.0015516854,0.00025644584,0.00008508687,0.00048161202,0.001195555,0.8350309,0.015958074,0.06015888,0.08502776,0.0001340679],"about_ca_topic_score_codex":0.026914647,"about_ca_topic_score_gemma":0.03704389,"teacher_disagreement_score":0.026914647,"about_ca_system_score_codex":0.0067232056,"about_ca_system_score_gemma":0.0041034976,"threshold_uncertainty_score":0.05351597},"labels":[],"label_agreement":null},{"id":"W1042486207","doi":"10.1016/j.autcon.2015.07.002","title":"Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":132,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Productivity; Prefabrication; Process (computing); Action research; Engineering; Business; Process management; Industrial organization; Operations management; Computer science; Economics; Civil engineering; Management; Economic growth","score_opus":0.10529566150774342,"score_gpt":0.341895599603656,"score_spread":0.2365999380959126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1042486207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966725,0.000008132116,0.0006761529,0.00006091577,0.0000019457775,0.000021197866,0.000046092624,0.000010792719,0.0025022824],"genre_scores_gemma":[0.9970203,0.000016237984,0.0022381265,0.000011021077,0.0000013331542,0.000020333224,0.000048907616,0.0000029892137,0.0006407577],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.996876,0.0017508159,0.00011461798,0.00023014074,0.0006455983,0.00038281525],"domain_scores_gemma":[0.9897641,0.006606202,0.0007684512,0.000638993,0.001478558,0.00074369827],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036234804,0.00035056387,0.00023024381,0.0010548629,0.0016084267,0.0014312685,0.0006312786,0.0005215916,0.0022050058],"category_scores_gemma":[0.009841791,0.0001878868,0.00022613857,0.0013404231,0.00080341153,0.0008022422,0.0012204058,0.0004761154,0.00031884958],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002476841,0.0051515396,0.71942466,0.00018672734,0.00011284714,0.0009942554,0.02112702,0.01738825,0.013781303,0.005553061,0.0014589933,0.2123446],"study_design_scores_gemma":[0.00009961192,0.003924734,0.880361,0.00006608675,0.000114445065,0.00025366593,0.042397182,0.05769297,0.007670345,0.0031882066,0.0041640704,0.000067610934],"about_ca_topic_score_codex":0.018449575,"about_ca_topic_score_gemma":0.032028522,"teacher_disagreement_score":0.018449575,"about_ca_system_score_codex":0.0021599117,"about_ca_system_score_gemma":0.0037809487,"threshold_uncertainty_score":0.036684394},"labels":[],"label_agreement":null},{"id":"W1140057221","doi":"10.1520/stp157420130107","title":"An Investigation on Bio-Based Polyurethane Foam Insulation for Building Construction","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Polyurethane; Foam concrete; Composite material; Materials science; Architectural engineering; Engineering","score_opus":0.018035329845711847,"score_gpt":0.2153833212308707,"score_spread":0.19734799138515885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1140057221","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50372535,0.18371873,0.07121565,0.00081951125,0.00063519715,0.00025032804,0.00026090673,0.00045188746,0.23892248],"genre_scores_gemma":[0.58992255,0.12141862,0.07375203,0.00062635395,0.00019723807,0.00012223046,0.00072743127,0.00013058714,0.2131029],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99994624,0.0000063072507,0.0000015162801,0.00000789935,0.0000318485,0.000006196676],"domain_scores_gemma":[0.9999753,0.000008928888,0.0000026979892,0.0000026433893,0.0000066455054,0.0000036616275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000093074275,0.0003136003,0.00017813775,0.00038705027,0.0001437688,0.00044239918,0.00025088043,0.000281287,0.0020745432],"category_scores_gemma":[0.000068278234,0.00009579225,0.00018298792,0.00049671065,0.00015965063,0.00048312824,0.00016978756,0.0003859414,0.0008013914],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057117843,0.00027880704,0.00032454045,0.00076524203,0.0000065674267,0.00039044872,0.00022465075,0.0012893253,0.69996005,0.005615833,0.0021280108,0.28895932],"study_design_scores_gemma":[0.000008632875,0.0014849378,0.0048708464,0.00022949003,0.000025871803,0.002455283,0.00022245695,0.0036112752,0.70367324,0.0024796957,0.28091416,0.000024160683],"about_ca_topic_score_codex":0.00014984212,"about_ca_topic_score_gemma":0.00039947938,"teacher_disagreement_score":0.0020745432,"about_ca_system_score_codex":0.0001678855,"about_ca_system_score_gemma":0.00016848526,"threshold_uncertainty_score":0.006940007},"labels":[],"label_agreement":null},{"id":"W1169558121","doi":"10.1017/cbo9780511614958.011","title":"Principles of virtual work","year":2002,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Work (physics); Computer science; Engineering; Mechanical engineering","score_opus":0.01184346950635905,"score_gpt":0.18245499296998563,"score_spread":0.17061152346362657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1169558121","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001972466,0.008245328,0.2662115,0.0045939935,0.0011101525,0.00020359844,0.00018419599,0.00040636747,0.71707237],"genre_scores_gemma":[0.30229983,0.02005525,0.2606933,0.0012442048,0.0010746189,0.0015783467,0.00048450124,0.00062957965,0.41194043],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9974452,0.0008579637,0.00019474422,0.00033031456,0.0009826233,0.00018914755],"domain_scores_gemma":[0.9991673,0.00021716832,0.000049483497,0.00024002536,0.00021913495,0.00010694461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020167928,0.0009448018,0.0006391509,0.0019067754,0.0025165263,0.008653609,0.002076884,0.0019201192,0.0269059],"category_scores_gemma":[0.0025545391,0.0005737913,0.000980393,0.0014768287,0.010986025,0.0051103802,0.0044499533,0.0023141438,0.011751349],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000040126984,0.0000070628175,0.000036288187,0.00006423043,0.0000030954077,0.000022457922,0.00045974634,0.00071417016,0.00007956764,0.97516507,0.006585729,0.016858468],"study_design_scores_gemma":[0.000008195938,0.000013432182,0.00012646093,0.00015696422,0.000005322605,0.00013632997,0.00037145903,0.0014212846,0.00019794735,0.7125678,0.28498292,0.000011921086],"about_ca_topic_score_codex":0.0029659336,"about_ca_topic_score_gemma":0.0027856114,"teacher_disagreement_score":0.0269059,"about_ca_system_score_codex":0.0023091095,"about_ca_system_score_gemma":0.0025345194,"threshold_uncertainty_score":0.09000921},"labels":[],"label_agreement":null},{"id":"W120103527","doi":"10.22260/isarc2013/0136","title":"Development of BIM based rehabilitation and maintenance process for roads","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Building information modeling; Computer science; Automation; Work (physics); Download; Control (management); Systems engineering; Construction engineering; Manufacturing engineering; Engineering; Artificial intelligence; Mechanical engineering; Operations management; World Wide Web; Operating system","score_opus":0.008186448416831249,"score_gpt":0.2073115852023902,"score_spread":0.19912513678555896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W120103527","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029883862,0.00018635903,0.9546262,0.0001503735,0.000052197367,0.0005181445,0.00037772954,0.004877006,0.0093281455],"genre_scores_gemma":[0.21648857,0.00032355287,0.77523696,0.000056834106,0.000020458485,0.0003907239,0.0013759813,0.00037293005,0.005734062],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982456,0.00022734514,0.00010384645,0.00021161816,0.0011012108,0.00011037204],"domain_scores_gemma":[0.99915886,0.00013057386,0.000060619142,0.00020237565,0.00039429817,0.000053273416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001329636,0.000624392,0.0005174803,0.0018926744,0.0006159437,0.0015083868,0.0011312228,0.00069152936,0.005268674],"category_scores_gemma":[0.0018119436,0.0004969884,0.0010313134,0.00093577575,0.00033786974,0.0014042171,0.0016723609,0.0006973772,0.0023569176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021062938,0.0005946582,0.005372287,0.0006077462,0.000057688627,0.00071023696,0.0013719955,0.120327726,0.09003928,0.015679717,0.0094812615,0.7555468],"study_design_scores_gemma":[0.000072988005,0.0004339477,0.009710305,0.00020595567,0.000103954844,0.0011078622,0.00095140527,0.7290739,0.14503741,0.009531527,0.10361245,0.0001583803],"about_ca_topic_score_codex":0.0021459472,"about_ca_topic_score_gemma":0.0015879234,"teacher_disagreement_score":0.005268674,"about_ca_system_score_codex":0.00046851227,"about_ca_system_score_gemma":0.0017885581,"threshold_uncertainty_score":0.017625451},"labels":[],"label_agreement":null},{"id":"W129345492","doi":"10.1007/978-1-4020-2393-4_3","title":"Computer-Aided Conceptual Design of Building Structures","year":2004,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec; Concordia University","funders":"","keywords":"Conceptual design; Representation (politics); Context (archaeology); Systems engineering; Software engineering; Computer science; Architecture; Architectural design; Architectural technology; Computer Aided Design; Software; Engineering; Engineering drawing; Programming language; Human–computer interaction","score_opus":0.020020217036004092,"score_gpt":0.20469796495609105,"score_spread":0.18467774792008695,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W129345492","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023098702,0.0032736429,0.912988,0.00018767644,0.00015804048,0.000056135385,0.00021709997,0.0011953134,0.07961423],"genre_scores_gemma":[0.06517085,0.008049945,0.78990924,0.00012288117,0.00007150513,0.00025886638,0.0015991473,0.00071800913,0.1340996],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968266,0.000048077214,0.000010501024,0.000028950546,0.00021322897,0.000016700222],"domain_scores_gemma":[0.99984276,0.00007156942,0.0000044314693,0.00003169441,0.00004465189,0.0000048784204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031554096,0.00083950115,0.0008474902,0.000720847,0.00037774863,0.0020272713,0.0018181362,0.0008295651,0.016356729],"category_scores_gemma":[0.0006467079,0.00086971663,0.00069565594,0.0010562345,0.0007373657,0.0009802468,0.00074173557,0.001066064,0.0045243],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025150375,0.000047094032,0.00020710914,0.00057648926,0.000037636048,0.00011703738,0.00033106506,0.19925217,0.0069127334,0.28352222,0.039008845,0.4699624],"study_design_scores_gemma":[0.000018328585,0.00003219747,0.00043412566,0.00022024664,0.000030709947,0.000397584,0.00013381943,0.35084245,0.009442723,0.118091494,0.52031857,0.000037771],"about_ca_topic_score_codex":0.0039416905,"about_ca_topic_score_gemma":0.0072941617,"teacher_disagreement_score":0.016356729,"about_ca_system_score_codex":0.00068694155,"about_ca_system_score_gemma":0.0011352294,"threshold_uncertainty_score":0.054718733},"labels":[],"label_agreement":null},{"id":"W133259137","doi":"10.5957/jsp.2008.24.1.1","title":"A Linear Programming Approach to Optimization of Ship Design and Construction Phases","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Rework; Shipbuilding; Schedule; Engineering; Duration (music); Linear programming; Operations research; Construction management; Design–build; Naval architecture; Computer science; Mathematical optimization; Civil engineering; Mathematics; Marine engineering","score_opus":0.03528924747972239,"score_gpt":0.23038810141038774,"score_spread":0.19509885393066534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W133259137","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074879546,0.0002483011,0.98310757,0.0002104392,0.0000360412,0.00016456824,0.00020990786,0.00017338806,0.008361893],"genre_scores_gemma":[0.28898343,0.0013941787,0.6872541,0.00025320615,0.000118503594,0.0022702904,0.0006312518,0.00029336326,0.01880167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989241,0.0005460109,0.00003774862,0.00013755994,0.00022239011,0.00013208587],"domain_scores_gemma":[0.99889475,0.00087173004,0.00007581135,0.000022677114,0.00011022832,0.000024800745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020370435,0.0021326442,0.0016062427,0.0013479936,0.0006680851,0.001985322,0.0016325332,0.0015360328,0.008402983],"category_scores_gemma":[0.0026389896,0.0016158181,0.0019818998,0.002122545,0.00080745167,0.001072693,0.00087655574,0.0024802089,0.0009149174],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008907947,0.000021265028,0.000053401935,0.000032649146,0.000010811231,0.000013281274,0.000009939959,0.99319035,0.00013926816,0.0026556244,0.0001811545,0.0036832858],"study_design_scores_gemma":[0.000009249888,0.000036049067,0.000050739054,0.0000088275165,0.000008148507,0.000006472716,0.000012877543,0.99574465,0.00018598858,0.0032196392,0.00071163196,0.000005772274],"about_ca_topic_score_codex":0.017468065,"about_ca_topic_score_gemma":0.017184794,"teacher_disagreement_score":0.017468065,"about_ca_system_score_codex":0.0022409717,"about_ca_system_score_gemma":0.0034731722,"threshold_uncertainty_score":0.03473276},"labels":[],"label_agreement":null},{"id":"W135582993","doi":"","title":"Editorial - Use of Gaming Technology in Architecture, Engineering and Construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Architecture; Engineering; Multimedia; Visualization; Engineering management; Computer science","score_opus":0.0031696174758520644,"score_gpt":0.1802410623213675,"score_spread":0.17707144484551543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W135582993","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000052826366,0.004790564,0.00008490857,0.015907852,0.97575617,0.000017958857,0.000040545117,0.000030380794,0.0033186509],"genre_scores_gemma":[0.00077541184,0.006734284,0.00012698029,0.0095041385,0.96515524,0.000025820453,0.00005563655,0.00004117323,0.017581299],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99543387,0.0005692757,0.0005347639,0.00042358998,0.0027662315,0.0002722152],"domain_scores_gemma":[0.9825258,0.006628716,0.00089164806,0.00043046346,0.007343634,0.00217974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004235773,0.0032777742,0.0025974815,0.0050496794,0.0037934715,0.007617503,0.0027252121,0.010281172,0.013524875],"category_scores_gemma":[0.015527646,0.0007962977,0.0018020862,0.0023815415,0.0021759174,0.004428279,0.0015909343,0.010459754,0.009276699],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019563664,0.000014741468,0.000020183044,0.00019480062,0.0000064147116,0.0001181548,0.000017152273,0.00003017092,0.000055534274,0.00025617442,0.99311674,0.0061503733],"study_design_scores_gemma":[0.000017076936,0.00002515827,0.0002699548,0.0004537394,0.000019878971,0.00037042474,0.000058455025,0.00009232973,0.00011171823,0.0005419351,0.99802655,0.000012689946],"about_ca_topic_score_codex":0.0018934924,"about_ca_topic_score_gemma":0.005894848,"teacher_disagreement_score":0.013524875,"about_ca_system_score_codex":0.0031965827,"about_ca_system_score_gemma":0.0031392528,"threshold_uncertainty_score":0.04524517},"labels":[],"label_agreement":null},{"id":"W138138192","doi":"10.22260/isarc2013/0014","title":"Improving Construction Environmental Metrics through Integration of Discrete Event Simulation and Life Cycle Analysis","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Event (particle physics); Computer science; Environmental science; Econometrics; Risk analysis (engineering); Mathematics; Business","score_opus":0.007024748712267992,"score_gpt":0.206692774224128,"score_spread":0.19966802551186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W138138192","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037019644,0.00039055775,0.9554689,0.00020099494,0.00004616645,0.00022164566,0.00018682993,0.0013749463,0.0050903326],"genre_scores_gemma":[0.48408246,0.00072092586,0.51285255,0.000038272985,0.000023083356,0.0003570896,0.0006740097,0.00025955986,0.0009920661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99694246,0.001258769,0.00022042808,0.00021915804,0.0012475697,0.00011158347],"domain_scores_gemma":[0.99565035,0.0021495402,0.00046150535,0.00054601865,0.0010667051,0.00012591456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034245343,0.0013097847,0.00090883556,0.0030641959,0.00029444185,0.0022838567,0.0010469211,0.00061476306,0.0014965151],"category_scores_gemma":[0.0071846563,0.00057454925,0.0012452708,0.0021633995,0.0004714819,0.0020220408,0.0015944875,0.0009533251,0.00033595684],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044402845,0.00014884972,0.0035404633,0.00011928358,0.0000893397,0.000038042697,0.00007655058,0.9196248,0.002986662,0.006074769,0.00044505464,0.06681174],"study_design_scores_gemma":[0.0000068540508,0.000039313116,0.00068515126,0.000023741346,0.000018908875,0.000011437257,0.000024254017,0.9933789,0.0015746558,0.0024935259,0.0017264145,0.000016880584],"about_ca_topic_score_codex":0.008204717,"about_ca_topic_score_gemma":0.0065200464,"teacher_disagreement_score":0.008204717,"about_ca_system_score_codex":0.0016725209,"about_ca_system_score_gemma":0.0017550413,"threshold_uncertainty_score":0.01811093},"labels":[],"label_agreement":null},{"id":"W138377706","doi":"10.1007/1-4020-4891-2_67","title":"Better Visualization for Multiple-Site Infrastructure Programs Using GIS","year":2007,"lang":"en","type":"book-chapter","venue":"Solid mechanics and its applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Scheduling (production processes); Geographic information system; Visualization; Schedule; Information system; Work (physics); Database; Engineering; Data mining; Geography; Operating system; Operations management; Cartography","score_opus":0.022485074935429634,"score_gpt":0.26277555291886506,"score_spread":0.24029047798343542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W138377706","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0063776057,0.00054578594,0.9441132,0.00045560786,0.00012462588,0.00003823612,0.00083959743,0.03493745,0.012567883],"genre_scores_gemma":[0.07404583,0.0012852084,0.8922558,0.0001469111,0.00007104326,0.00010184729,0.0020823553,0.013008889,0.017002141],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996978,0.00006576629,0.000019291216,0.000044600307,0.00014596875,0.000026585443],"domain_scores_gemma":[0.9992229,0.0003821808,0.000020991838,0.00016607613,0.00016922916,0.00003860813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057680934,0.0016550936,0.00096846715,0.0013278523,0.0005135197,0.0022095165,0.0017360135,0.000805816,0.048754986],"category_scores_gemma":[0.0018062657,0.00084295834,0.0010319061,0.0017406829,0.0003233554,0.0038588154,0.0015435795,0.0013674762,0.0056325058],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018615494,0.00019269489,0.0014646914,0.0008121637,0.00010350347,0.000461108,0.001260622,0.06861526,0.034073338,0.055875674,0.13604978,0.70090497],"study_design_scores_gemma":[0.00008693747,0.000077874305,0.0016309891,0.0002405171,0.000104659506,0.000769836,0.0003588123,0.6140535,0.042734746,0.050563667,0.28923598,0.00014254407],"about_ca_topic_score_codex":0.0036111872,"about_ca_topic_score_gemma":0.0060120556,"teacher_disagreement_score":0.048754986,"about_ca_system_score_codex":0.00048227265,"about_ca_system_score_gemma":0.0004264216,"threshold_uncertainty_score":0.16310167},"labels":[],"label_agreement":null},{"id":"W1456821793","doi":"10.22260/isarc2013/0163","title":"Risk Identification Expert System for Metro Construction Based on BIM","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Identification (biology); Knowledge base; Expert system; Tacit knowledge; Domain (mathematical analysis); Computer science; Risk analysis (engineering); Engineering; Building information modeling; Risk management; Knowledge extraction; Bridge (graph theory); Knowledge management; Data mining; Artificial intelligence; Operations management","score_opus":0.007213105801386763,"score_gpt":0.19407494790739896,"score_spread":0.1868618421060122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1456821793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03668017,0.00021669126,0.9335202,0.00017827224,0.000035014145,0.00046785144,0.0006632495,0.020964222,0.0072743082],"genre_scores_gemma":[0.2905894,0.0003463951,0.6989095,0.00013006254,0.000031904612,0.0005916029,0.0024703152,0.00039069197,0.006540012],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989102,0.00021457543,0.00014688291,0.0002620742,0.0004029162,0.00006340091],"domain_scores_gemma":[0.9988851,0.00040172873,0.000082893275,0.0001841214,0.00038607008,0.00006018416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017171074,0.00086346595,0.0010402447,0.0018826833,0.00058286334,0.0012593931,0.0014098281,0.0009265265,0.00678503],"category_scores_gemma":[0.0028936039,0.0005759304,0.0008266904,0.00080487586,0.00023881889,0.0014325264,0.0016656949,0.00069284963,0.0021060992],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066182076,0.00081636634,0.007969071,0.00085232453,0.00026967438,0.0019714988,0.0022252935,0.11709933,0.079960704,0.00800163,0.019178154,0.7609942],"study_design_scores_gemma":[0.00016479193,0.000111690264,0.0037590158,0.00013547932,0.00019703986,0.00067157985,0.00045688136,0.93877816,0.023953507,0.005652676,0.026021725,0.00009756646],"about_ca_topic_score_codex":0.00241337,"about_ca_topic_score_gemma":0.0025412247,"teacher_disagreement_score":0.00678503,"about_ca_system_score_codex":0.0005104209,"about_ca_system_score_gemma":0.0011966258,"threshold_uncertainty_score":0.022698224},"labels":[],"label_agreement":null},{"id":"W1496952816","doi":"10.25916/sut.26223833","title":"Cyclic Functional Collaboration: A scientific approach to housing","year":2012,"lang":"en","type":"article","venue":"Swinburne Research Bank (Swinburne University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Computer science; Public relations; Political science","score_opus":0.0330381216406927,"score_gpt":0.25111032453493026,"score_spread":0.21807220289423757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1496952816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019501721,0.011795815,0.55423665,0.08617355,0.0017802208,0.0006584327,0.00016899689,0.00023955741,0.32544503],"genre_scores_gemma":[0.75842667,0.010559989,0.19560543,0.0060891206,0.0018872853,0.0021473898,0.00021192986,0.00022087926,0.024851331],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9657568,0.02719758,0.0007640466,0.0020429292,0.0033573646,0.00088120176],"domain_scores_gemma":[0.9800757,0.012395249,0.001572738,0.0028156275,0.0021359844,0.0010047576],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026573256,0.00081311166,0.0006802139,0.0059973043,0.009186303,0.010989217,0.0038751957,0.0051769787,0.0054581696],"category_scores_gemma":[0.020129127,0.00056404836,0.0012162912,0.005976717,0.06376386,0.016289996,0.012682491,0.004584014,0.00096293207],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007965522,0.000013960634,0.0002845807,0.00009470633,0.000005823478,0.000043184824,0.008919682,0.000693316,0.000043822118,0.97979903,0.002083131,0.008010744],"study_design_scores_gemma":[0.000009497105,0.00002318386,0.00022245738,0.00013796815,0.0000051552297,0.000068143694,0.004743825,0.0012534875,0.000087993794,0.9379147,0.05552296,0.000010692291],"about_ca_topic_score_codex":0.0038181886,"about_ca_topic_score_gemma":0.0045741224,"teacher_disagreement_score":0.026573256,"about_ca_system_score_codex":0.011559299,"about_ca_system_score_gemma":0.014662669,"threshold_uncertainty_score":0.14053446},"labels":[],"label_agreement":null},{"id":"W1500035233","doi":"10.1108/ci-01-2014-0013","title":"Embedded contexts of innovation","year":2015,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"","keywords":"Originality; Leverage (statistics); Process (computing); Business; Innovation process; Process management; Knowledge management; Bridge (graph theory); Perspective (graphical); Marketing; Computer science; Work in process; Qualitative research; Sociology","score_opus":0.02258167117858278,"score_gpt":0.2423899414925268,"score_spread":0.219808270313944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1500035233","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28766438,0.012995643,0.10357978,0.023064926,0.0008773209,0.0004937321,0.00019462108,0.00026523904,0.5708644],"genre_scores_gemma":[0.982896,0.0018584693,0.008296526,0.00062783156,0.00009553792,0.000146131,0.00003801595,0.00003919059,0.006002377],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9902514,0.0058502103,0.0003992479,0.0013285931,0.001202868,0.00096762204],"domain_scores_gemma":[0.9864602,0.008931373,0.0010757108,0.0017532342,0.0008107194,0.0009687626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068537807,0.00068607106,0.00055893394,0.00274477,0.005368638,0.012058538,0.0014972477,0.0032522501,0.009652994],"category_scores_gemma":[0.009761579,0.0003966886,0.0010648891,0.0019330548,0.026541138,0.00912424,0.011566214,0.0023215583,0.0010539267],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003209311,0.000064713255,0.0033024158,0.00033318598,0.000033065568,0.0010078949,0.039179437,0.0011893992,0.00069975073,0.93456316,0.00073216483,0.018862784],"study_design_scores_gemma":[0.00005047402,0.00015930831,0.0052194973,0.0007887092,0.00005400699,0.0014872098,0.047020208,0.0026880703,0.0011265462,0.759258,0.18208088,0.0000672081],"about_ca_topic_score_codex":0.001474885,"about_ca_topic_score_gemma":0.001320411,"teacher_disagreement_score":0.012058538,"about_ca_system_score_codex":0.004639987,"about_ca_system_score_gemma":0.0047988687,"threshold_uncertainty_score":0.036246657},"labels":[],"label_agreement":null},{"id":"W1506789237","doi":"10.1111/j.1467-8667.2010.00650.x","title":"Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction","year":2010,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; U.S. Department of Defense","keywords":"Computer science; System dynamics; Context (archaeology); Hybrid system; Architecture; Event (particle physics); Discrete event simulation; Systems engineering; Complex system; Distributed computing; Systems modeling; Industrial engineering; Simulation; Artificial intelligence; Engineering; Software engineering; Machine learning","score_opus":0.0024028536407555423,"score_gpt":0.18188607908299811,"score_spread":0.17948322544224257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1506789237","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015576893,0.000040152285,0.99576914,0.00006563585,0.000021295697,0.000033850843,0.000063226755,0.00060922664,0.0018396596],"genre_scores_gemma":[0.28515133,0.00042831947,0.7082977,0.00010691742,0.00007414617,0.00069117104,0.0005940757,0.00030514193,0.0043511637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945766,0.00014065202,0.00003894648,0.0000904919,0.000227093,0.000045208148],"domain_scores_gemma":[0.9996723,0.00009982982,0.000032377502,0.000058648322,0.00011098706,0.000025855403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000983917,0.00076484936,0.0010442929,0.0008486539,0.0006803245,0.0015905094,0.002571548,0.0010702912,0.0040385323],"category_scores_gemma":[0.0012121768,0.00056808296,0.0011750556,0.0007807334,0.0008304976,0.0013007127,0.0013240228,0.0012172909,0.0008470656],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003146503,0.000051003568,0.00042191023,0.00006647719,0.0000532562,0.0000535869,0.00009563243,0.8322268,0.0020318849,0.14605309,0.00081902766,0.018095858],"study_design_scores_gemma":[0.000011263887,0.000012105911,0.000057838675,0.0000071497457,0.000012505343,0.000013267016,0.000009793732,0.9808442,0.0005358943,0.015248538,0.003239639,0.00000776216],"about_ca_topic_score_codex":0.010159679,"about_ca_topic_score_gemma":0.0060377214,"teacher_disagreement_score":0.010159679,"about_ca_system_score_codex":0.0008315987,"about_ca_system_score_gemma":0.00197876,"threshold_uncertainty_score":0.020201087},"labels":[],"label_agreement":null},{"id":"W1508591347","doi":"","title":"Seismic retrofitting of deficient Canadian buildings","year":2009,"lang":"en","type":"dissertation","venue":"DSpace@MIT (Massachusetts Institute of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Retrofitting; Architectural engineering; Seismic retrofit; Engineering; Forensic engineering; Civil engineering; Construction engineering; Structural engineering; Reinforced concrete","score_opus":0.005632949883183466,"score_gpt":0.20796672194628918,"score_spread":0.2023337720631057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1508591347","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96631235,0.00015519575,0.0072833505,0.000066595116,0.000009282972,0.0000382355,0.00018805102,0.00024021055,0.025706582],"genre_scores_gemma":[0.99215394,0.00020418882,0.002659926,0.000010097341,0.0000011673304,0.000006251026,0.00011587876,0.00001693157,0.004831596],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996278,0.000024682891,0.000008068389,0.000033951892,0.00021845372,0.00008698933],"domain_scores_gemma":[0.9997979,0.000018452767,0.000022463706,0.00001984057,0.00011891566,0.000022447603],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024635356,0.00058347394,0.0002792232,0.0007251253,0.0013487501,0.0009881774,0.0008382034,0.0002901788,0.0022170742],"category_scores_gemma":[0.00056564756,0.00022065328,0.00025691825,0.00095985574,0.0005004878,0.00027201895,0.0006182589,0.0002142047,0.00032582946],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083706924,0.00025003657,0.05881139,0.00065023743,0.00008237377,0.0033083768,0.0062230714,0.26935986,0.22681434,0.013346423,0.0069937315,0.41332304],"study_design_scores_gemma":[0.00010336528,0.0012948534,0.29555818,0.00023823608,0.0003514708,0.002414046,0.01460445,0.3820525,0.20410666,0.0025658938,0.096463636,0.00024674076],"about_ca_topic_score_codex":0.6241597,"about_ca_topic_score_gemma":0.84162563,"teacher_disagreement_score":0.3758403,"about_ca_system_score_codex":0.005535288,"about_ca_system_score_gemma":0.0050789453,"threshold_uncertainty_score":0.7561074},"labels":[],"label_agreement":null},{"id":"W1519032648","doi":"10.3846/13928619.2007.9637780","title":"MANAGERIAL AND ECONOMIC OPTIMISATIONS FOR PREFABRICATED BUILDING SYSTEMS","year":2007,"lang":"en","type":"article","venue":"Technological and Economic Development of Economy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Simple (philosophy); Point (geometry); Architectural engineering; Computer science; Risk analysis (engineering); Environmental economics; Business; Economics; Engineering; Mathematics","score_opus":0.01536978068560412,"score_gpt":0.20537390783205434,"score_spread":0.1900041271464502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1519032648","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.067595474,0.0021764992,0.86480147,0.0016428183,0.00018396051,0.00020146773,0.00013345583,0.00013435564,0.06313046],"genre_scores_gemma":[0.8066528,0.001624703,0.17463714,0.00009563382,0.00011340681,0.0003142208,0.00013377456,0.000080172504,0.016348112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963632,0.0016644141,0.0001155808,0.00032614544,0.0011868624,0.00034384115],"domain_scores_gemma":[0.998047,0.0011550356,0.00026405652,0.00021507397,0.00021194886,0.000106943146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003188987,0.0010565575,0.0008919235,0.0009185444,0.0007860684,0.0033195098,0.0010159812,0.0015990052,0.007931057],"category_scores_gemma":[0.00597553,0.0007440779,0.0009304814,0.001034051,0.0018076443,0.0028163253,0.0019549215,0.0018263654,0.00056306215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053890548,0.000079312704,0.0004128909,0.00015387799,0.000025472751,0.00010124727,0.00013696245,0.799935,0.00190634,0.17020336,0.0006687069,0.026322892],"study_design_scores_gemma":[0.000037175258,0.0001978643,0.0014193828,0.0000901508,0.000028910017,0.00013449017,0.0003062686,0.76763254,0.0014932384,0.2128448,0.015763493,0.000051625044],"about_ca_topic_score_codex":0.0018597657,"about_ca_topic_score_gemma":0.0024739888,"teacher_disagreement_score":0.007931057,"about_ca_system_score_codex":0.0023733003,"about_ca_system_score_gemma":0.0016456195,"threshold_uncertainty_score":0.026531994},"labels":[],"label_agreement":null},{"id":"W1524592758","doi":"10.1520/stp158620140033","title":"Feedback from the Source Improving Productivity on Construction Jobsites","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Computer science; Economics; Economic growth","score_opus":0.007159247921645585,"score_gpt":0.1621446157154688,"score_spread":0.15498536779382321,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1524592758","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34726846,0.0016006302,0.12085341,0.023303183,0.0024005333,0.004433966,0.012395411,0.024927542,0.4628169],"genre_scores_gemma":[0.6627679,0.0023780586,0.14005505,0.003991259,0.0006341223,0.0027114828,0.009286533,0.007527704,0.17064789],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98138416,0.0048540602,0.0008892108,0.0010899531,0.011124707,0.000657857],"domain_scores_gemma":[0.8667112,0.044532634,0.005241015,0.01124392,0.06889812,0.0033731244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016328253,0.0011740951,0.00067524443,0.0042135445,0.0018493325,0.0034615165,0.001784947,0.0016524184,0.037783213],"category_scores_gemma":[0.10539039,0.00041318688,0.0005677408,0.0026082974,0.00065314356,0.0024278492,0.0046274266,0.0016214009,0.015351849],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008513201,0.00096989516,0.023637362,0.0017701569,0.00005219137,0.0012946267,0.031237334,0.001398327,0.017076869,0.0018375403,0.20074789,0.71912646],"study_design_scores_gemma":[0.0002758394,0.0023618445,0.10098923,0.0033321865,0.0002434137,0.00095937547,0.04421171,0.0065424563,0.05670311,0.0040650847,0.7799189,0.00039687438],"about_ca_topic_score_codex":0.005312845,"about_ca_topic_score_gemma":0.0064908485,"teacher_disagreement_score":0.037783213,"about_ca_system_score_codex":0.0030394706,"about_ca_system_score_gemma":0.0047160834,"threshold_uncertainty_score":0.12639743},"labels":[],"label_agreement":null},{"id":"W1529431045","doi":"10.1007/978-3-642-03364-3_42","title":"Construction Knowledge Transfer through Interactive Visualization","year":2009,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Laptop; Variety (cybernetics); Computer science; Knowledge transfer; Entertainment; Visualization; Demographics; Installation; Workforce; Population; Knowledge management; Data science; Artificial intelligence","score_opus":0.011112916312637146,"score_gpt":0.2451645409763001,"score_spread":0.23405162466366297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1529431045","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021584038,0.00054638786,0.90473306,0.00041912575,0.00006416232,0.000062964114,0.00016688452,0.004554818,0.06786861],"genre_scores_gemma":[0.52355325,0.0018725939,0.42910227,0.00010842451,0.000051334056,0.00023290397,0.00085595273,0.0011834576,0.04303991],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99956375,0.000100631434,0.000021966462,0.00008031396,0.00019657277,0.000036755657],"domain_scores_gemma":[0.9986541,0.0008755346,0.000031059357,0.00029571482,0.000119406104,0.000024118704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084741757,0.0006736173,0.00052610534,0.0013310481,0.00046756037,0.0029588297,0.0013595938,0.0008642059,0.019570589],"category_scores_gemma":[0.003633519,0.0005247679,0.00056542223,0.0014664228,0.0010002762,0.0056547257,0.0035784505,0.0010661625,0.0023601544],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121296696,0.00012130293,0.00047907018,0.00044965738,0.00004797777,0.00024832346,0.0040807775,0.029968468,0.022241646,0.1307466,0.011635212,0.79985964],"study_design_scores_gemma":[0.00007254198,0.00012313263,0.0023602447,0.00041904097,0.00014425526,0.0007928768,0.002746841,0.33130804,0.074210875,0.41579136,0.17192948,0.00010132846],"about_ca_topic_score_codex":0.0014391848,"about_ca_topic_score_gemma":0.0013346678,"teacher_disagreement_score":0.019570589,"about_ca_system_score_codex":0.0004898996,"about_ca_system_score_gemma":0.00046970215,"threshold_uncertainty_score":0.06547016},"labels":[],"label_agreement":null},{"id":"W1533613473","doi":"","title":"Post Construction HVAC Noise Control","year":2010,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"HVAC; Noise control; Noise (video); Computer science; Automotive engineering; Environmental science; Engineering; Acoustics; Noise reduction; Mechanical engineering; Physics; Air conditioning","score_opus":0.0023174262754202214,"score_gpt":0.15918163860743864,"score_spread":0.15686421233201842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1533613473","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28591377,0.00080554304,0.40899518,0.0007462439,0.001371778,0.00042629687,0.0010266317,0.008511797,0.29220283],"genre_scores_gemma":[0.8674137,0.00018840325,0.029649334,0.00010509396,0.000088885296,0.00008227479,0.00069593196,0.00044971608,0.10132662],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99729425,0.00014032295,0.000053324467,0.00021554498,0.0018841621,0.00041242188],"domain_scores_gemma":[0.9975439,0.000109023116,0.0001048638,0.00014527774,0.0019984846,0.00009843323],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010362417,0.0009492555,0.000578987,0.0011269045,0.002435604,0.0025753581,0.0012931247,0.000651236,0.012236582],"category_scores_gemma":[0.0018779276,0.00030115852,0.0002624802,0.00050952233,0.00066947355,0.0006361427,0.0013866106,0.0009927758,0.0039532925],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013326996,0.0006191901,0.018924246,0.0002590112,0.00004010563,0.0001914687,0.0015728796,0.04485837,0.1795774,0.009712406,0.031812906,0.7110993],"study_design_scores_gemma":[0.00014238564,0.0014659206,0.18459477,0.00025303534,0.0001540261,0.0003887577,0.003299726,0.26630637,0.24107666,0.003569476,0.29848224,0.00026671126],"about_ca_topic_score_codex":0.11588922,"about_ca_topic_score_gemma":0.14141016,"teacher_disagreement_score":0.11588922,"about_ca_system_score_codex":0.002244072,"about_ca_system_score_gemma":0.006133515,"threshold_uncertainty_score":0.23042935},"labels":[],"label_agreement":null},{"id":"W1537281386","doi":"","title":"Alarmlocator: A software tool to facilitate the installation of acoustic warning devices in noisy work plants","year":2006,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Workstation; Installation; Software; Computer science; Process (computing); Ceiling (cloud); Work (physics); Engineering; Operating system; Mechanical engineering","score_opus":0.011003232326964044,"score_gpt":0.17970384216614735,"score_spread":0.1687006098391833,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1537281386","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007599846,0.00007712104,0.89258146,0.00005905045,0.000044540433,0.0001742605,0.00041014378,0.097322635,0.0017308479],"genre_scores_gemma":[0.14849113,0.00030909758,0.821851,0.00013354454,0.000056868037,0.00087543577,0.0021369308,0.012659387,0.013486447],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989723,0.00019329692,0.0000998215,0.00016661106,0.00049008493,0.00007795585],"domain_scores_gemma":[0.99664897,0.0017434432,0.00032529913,0.00048910663,0.0006407992,0.00015238208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019789417,0.0015437955,0.00096633757,0.0014316816,0.00040913158,0.0010415972,0.00216426,0.0009817437,0.010974572],"category_scores_gemma":[0.0060439487,0.0012312615,0.00064851384,0.00052378944,0.000606063,0.0017269382,0.0016924032,0.0012270947,0.0036085614],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012818635,0.0005691355,0.0050678523,0.0014817477,0.00020578624,0.0011352295,0.002021073,0.07976441,0.104750015,0.013124772,0.065857686,0.72474045],"study_design_scores_gemma":[0.00052033353,0.0006186767,0.005978642,0.00032443297,0.00020222957,0.0016057994,0.00020298197,0.5981706,0.15359628,0.007568993,0.23078579,0.00042538956],"about_ca_topic_score_codex":0.0014013108,"about_ca_topic_score_gemma":0.001748995,"teacher_disagreement_score":0.010974572,"about_ca_system_score_codex":0.0004153532,"about_ca_system_score_gemma":0.0010926869,"threshold_uncertainty_score":0.03671366},"labels":[],"label_agreement":null},{"id":"W1560069727","doi":"","title":"Optimizing and controlling earthmoving operations using spatial technologies","year":2008,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Concordia University","keywords":"Crew; Global Positioning System; Process (computing); Engineering; Genetic algorithm; Operations research; Industrial engineering; Computer science; Systems engineering","score_opus":0.019166991117658436,"score_gpt":0.24321242833326184,"score_spread":0.2240454372156034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1560069727","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061960224,0.00024869893,0.9159111,0.00028605474,0.000041059142,0.00014726284,0.00025977043,0.0006013457,0.020544555],"genre_scores_gemma":[0.8527028,0.00078058144,0.12868778,0.00007724404,0.000021982243,0.0005007064,0.00035862174,0.0001256248,0.016744586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999762,0.000052518502,0.0000103339935,0.000065943794,0.00006784561,0.000041354782],"domain_scores_gemma":[0.9998178,0.00007472208,0.000036706315,0.000017065757,0.000037004083,0.000016849024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003347496,0.0008381431,0.0007147418,0.0005016252,0.00053957396,0.0018377046,0.0011386252,0.001043129,0.0031748323],"category_scores_gemma":[0.00063469954,0.000471695,0.00087429024,0.000583428,0.00062303967,0.0011989401,0.0007707297,0.0007299031,0.00048387673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009485408,0.000015009734,0.00024148593,0.000013329553,0.000006112861,0.000018010564,0.000011330299,0.99249613,0.0005067445,0.0030740185,0.000113132555,0.0034951505],"study_design_scores_gemma":[0.000005043747,0.000024159797,0.00008930174,0.0000042040565,0.0000056524736,0.0000074985733,0.000011135186,0.9975642,0.00039790175,0.001122136,0.00076457777,0.000004245702],"about_ca_topic_score_codex":0.013941414,"about_ca_topic_score_gemma":0.008988312,"teacher_disagreement_score":0.013941414,"about_ca_system_score_codex":0.0011421856,"about_ca_system_score_gemma":0.0018572279,"threshold_uncertainty_score":0.027720511},"labels":[],"label_agreement":null},{"id":"W1573220347","doi":"","title":"Acoustics Week in Canada 2014","year":2014,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Acoustics; Engineering; Telecommunications; Geology; Physics","score_opus":0.0044007061223946585,"score_gpt":0.15343780885815034,"score_spread":0.14903710273575568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1573220347","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007285969,0.0065619545,0.0019105321,0.021935135,0.028568849,0.00039661606,0.032843858,0.002050038,0.8984471],"genre_scores_gemma":[0.008293572,0.0015885888,0.00052165316,0.0013388484,0.000533156,0.00007082575,0.005693161,0.00033115078,0.981629],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99823713,0.000052983258,0.000043752334,0.00015457884,0.0010669725,0.00044455004],"domain_scores_gemma":[0.9971341,0.000056916062,0.000046952013,0.00010288059,0.0015924667,0.001066725],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001404058,0.0011720022,0.0006785202,0.0016313454,0.008100689,0.0068805544,0.0013016546,0.0017687399,0.33378592],"category_scores_gemma":[0.0017736421,0.00042755398,0.0006174763,0.0021704084,0.0011925993,0.0011593269,0.0037859557,0.0019167765,0.11278295],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045877427,0.000027262342,0.0007672241,0.00006609059,0.000005361182,0.0001000283,0.00020356072,0.000043368567,0.00047121616,0.0016229586,0.97260916,0.024037858],"study_design_scores_gemma":[0.0000032292446,0.0000070785613,0.0024787323,0.000028576513,0.0000017289138,0.000016172775,0.00025098326,0.00001927041,0.00010055269,0.00005880875,0.9970258,0.00000898031],"about_ca_topic_score_codex":0.8446861,"about_ca_topic_score_gemma":0.9560928,"teacher_disagreement_score":0.33378592,"about_ca_system_score_codex":0.015181961,"about_ca_system_score_gemma":0.05312895,"threshold_uncertainty_score":0.9502735},"labels":[],"label_agreement":null},{"id":"W157466560","doi":"10.22260/isarc2013/0076","title":"Integration of Uncertain Real-Time Logistics Data for Reactive Scheduling Using Fuzzy Set Theory","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Fuzzy logic; Fuzzy set; Operations research; Discrete event simulation; Uncertain data; Real-time computing; Data mining; Industrial engineering; Mathematical optimization; Simulation; Artificial intelligence; Engineering; Mathematics","score_opus":0.04999149121253673,"score_gpt":0.27481812433806907,"score_spread":0.22482663312553233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W157466560","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00996301,0.00010743209,0.98880345,0.00004239944,0.000025564077,0.000045104924,0.000028350929,0.00008079502,0.0009038798],"genre_scores_gemma":[0.72884244,0.00040403486,0.26937237,0.000041684198,0.000052976437,0.00025242692,0.00025476376,0.00004834935,0.00073088834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855095,0.0004133874,0.0001135742,0.00014512597,0.00069801114,0.000078938094],"domain_scores_gemma":[0.9983133,0.0009183955,0.00024800768,0.00009301379,0.00036560264,0.00006166227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021988812,0.0007996034,0.00084389583,0.0013337854,0.0004404822,0.001809509,0.0009741845,0.0005143336,0.0009737154],"category_scores_gemma":[0.0037839208,0.00044739048,0.0014402288,0.0013223409,0.00051763054,0.001208765,0.0007406556,0.0009362025,0.00018775625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006214033,0.000045578836,0.00054108066,0.00006425048,0.000047158464,0.00005393242,0.00007302137,0.9656858,0.0024217002,0.007769346,0.00020889286,0.02302718],"study_design_scores_gemma":[0.00000310524,0.000017818676,0.00009722236,0.0000073132933,0.000008170778,0.0000050337067,0.000009394343,0.99752575,0.00051675714,0.0015827884,0.0002212337,0.0000055177743],"about_ca_topic_score_codex":0.005997535,"about_ca_topic_score_gemma":0.0036552988,"teacher_disagreement_score":0.005997535,"about_ca_system_score_codex":0.001462055,"about_ca_system_score_gemma":0.0014807147,"threshold_uncertainty_score":0.01192528},"labels":[],"label_agreement":null},{"id":"W1582205711","doi":"","title":"L'aménagement d'une cour d'un centre de distribution : optimisation au moyen d'un outil d'aide à la décision","year":2013,"lang":"fr","type":"article","venue":"Archipelago (Université du Québec à Montréal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Philosophy","score_opus":0.004850043366300512,"score_gpt":0.15647291267738328,"score_spread":0.15162286931108276,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1582205711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14398621,0.0027484854,0.80382997,0.0010410504,0.00021872438,0.0004049679,0.00033722358,0.0012076735,0.046225704],"genre_scores_gemma":[0.82416415,0.0018844462,0.14416282,0.00019224988,0.00006976362,0.00035581327,0.00028868273,0.00028652934,0.028595535],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99880505,0.00027519272,0.000043144297,0.00027294442,0.0003460035,0.00025768322],"domain_scores_gemma":[0.9985702,0.00059451937,0.00019261749,0.0000825888,0.00036763426,0.00019242709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015617886,0.0014186936,0.0015229558,0.0010673327,0.0011882472,0.004513697,0.0018375315,0.0023780072,0.014125383],"category_scores_gemma":[0.0028372179,0.0006789384,0.0010103827,0.0011997808,0.00086321414,0.002365398,0.0017705467,0.0016307072,0.001893809],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008417005,0.00025736744,0.0029615979,0.0010030346,0.00010190973,0.000285847,0.00044204,0.7551582,0.029456483,0.01601994,0.0027037822,0.19076826],"study_design_scores_gemma":[0.00017204751,0.0013464692,0.006345227,0.00031543942,0.00022104509,0.00022180295,0.0010317242,0.89972675,0.030355413,0.017979037,0.042099763,0.00018537123],"about_ca_topic_score_codex":0.01326061,"about_ca_topic_score_gemma":0.012917737,"teacher_disagreement_score":0.014125383,"about_ca_system_score_codex":0.0025023727,"about_ca_system_score_gemma":0.002850022,"threshold_uncertainty_score":0.047254086},"labels":[],"label_agreement":null},{"id":"W1583606335","doi":"10.11606/d.18.2006.tde-19072006-103742","title":"Otimização de seções transversais de concreto armado: aplicação a pórticos planos","year":2006,"lang":"pt","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Adidas (Canada)","funders":"","keywords":"Physics; Humanities; Philosophy","score_opus":0.007334563013633698,"score_gpt":0.2232938335248125,"score_spread":0.2159592705111788,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1583606335","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13855256,0.0006197304,0.82672113,0.00055926765,0.00016733447,0.0002148836,0.00018288141,0.006374909,0.026607193],"genre_scores_gemma":[0.7397198,0.0005616081,0.23950268,0.000107381995,0.000029417084,0.00014909239,0.0002646359,0.0008198875,0.018845504],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991373,0.00014522838,0.000055263637,0.00020037557,0.00035469508,0.00010711613],"domain_scores_gemma":[0.9979044,0.00077714527,0.0001977947,0.00044023845,0.00048543862,0.000194887],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011454849,0.00094232144,0.00056473067,0.0010966262,0.00091627013,0.004275191,0.0015739496,0.0011596157,0.013725275],"category_scores_gemma":[0.0063099647,0.000821784,0.0007558903,0.0007595927,0.00088149356,0.002979661,0.0023771971,0.0011967476,0.0022429598],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011738921,0.00049629266,0.014532725,0.00069200544,0.00009581416,0.0012029478,0.0039544795,0.33874795,0.09956236,0.0572945,0.0062758606,0.47597122],"study_design_scores_gemma":[0.00004573118,0.0002806688,0.002464273,0.00008898373,0.000058630467,0.0002479418,0.0008613634,0.93173194,0.030000398,0.010945193,0.023212958,0.00006193733],"about_ca_topic_score_codex":0.00801971,"about_ca_topic_score_gemma":0.010125846,"teacher_disagreement_score":0.013725275,"about_ca_system_score_codex":0.0011053312,"about_ca_system_score_gemma":0.0015694017,"threshold_uncertainty_score":0.045915663},"labels":[],"label_agreement":null},{"id":"W1594483674","doi":"10.1007/11888598_51","title":"Computer Assistance for Sustainable Building Design","year":2006,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Human–computer interaction; Software engineering","score_opus":0.010738023757151702,"score_gpt":0.21309709940650653,"score_spread":0.20235907564935485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1594483674","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008943035,0.007831119,0.7342159,0.00074837747,0.00048794708,0.000071299175,0.00024093117,0.0047519347,0.24270937],"genre_scores_gemma":[0.18453892,0.011011315,0.40821669,0.00039297104,0.00030538984,0.00020957824,0.0009811616,0.00091434264,0.3934297],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998566,0.000031592004,0.0000046215473,0.000017742257,0.000078236684,0.000011259449],"domain_scores_gemma":[0.9998565,0.00006307777,0.0000040154914,0.000028317401,0.000041858268,0.0000062664085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016614886,0.0006122242,0.0003565494,0.0005106204,0.000298874,0.00075449154,0.0006694758,0.0006865083,0.047751576],"category_scores_gemma":[0.00045382814,0.00020865777,0.00020454884,0.00072850497,0.00028259822,0.0008283866,0.00091894536,0.00047013597,0.008215903],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050289127,0.000046949066,0.00017123294,0.00029178316,0.000013375405,0.00013019722,0.00020147041,0.014882546,0.0118613215,0.04350991,0.078925095,0.8499158],"study_design_scores_gemma":[0.000020633102,0.00007151813,0.0006923382,0.00024039052,0.00002190005,0.0005021867,0.00018311977,0.08162742,0.013818936,0.04799211,0.8548051,0.000024351531],"about_ca_topic_score_codex":0.0008393955,"about_ca_topic_score_gemma":0.0014552188,"teacher_disagreement_score":0.047751576,"about_ca_system_score_codex":0.00019864277,"about_ca_system_score_gemma":0.00026752925,"threshold_uncertainty_score":0.15974492},"labels":[],"label_agreement":null},{"id":"W1607250175","doi":"","title":"THIRTY METER TELESCOPE (TMT) SITE MERIT FUNCTION","year":2011,"lang":"es","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ontario Ministry of Research and Innovation; British Columbia Knowledge Development Fund; Natural Sciences and Engineering Research Council of Canada; Association of Canadian Universities for Research in Astronomy; California Institute of Technology; Gordon and Betty Moore Foundation; National Science Foundation","keywords":"Physics; Telescope; Metre; Function (biology); Figure of merit; Remote sensing; Astronomy; Optics; Geography","score_opus":0.015302192331344307,"score_gpt":0.1961499278156837,"score_spread":0.18084773548433938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1607250175","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30095854,0.00060443266,0.60813236,0.0007968375,0.0002560235,0.00025648365,0.019895459,0.0039727916,0.06512708],"genre_scores_gemma":[0.7591678,0.00029049796,0.22443475,0.00008915509,0.000047397076,0.00016952015,0.009118721,0.00035383276,0.0063283946],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983621,0.00026027404,0.00006449549,0.0001792408,0.0010285843,0.00010522673],"domain_scores_gemma":[0.99765825,0.0005225674,0.00028970375,0.00035118868,0.0010700905,0.00010814171],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023082767,0.00054456736,0.0007452935,0.0037776094,0.000774127,0.0014908676,0.00064680655,0.00054175465,0.0033943856],"category_scores_gemma":[0.0064367424,0.00026731353,0.00050226273,0.005081023,0.00061652716,0.0013719964,0.0013281268,0.0007905045,0.001676276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003495339,0.00013587125,0.13921174,0.00064088823,0.00023578513,0.00039791912,0.0010069414,0.110873215,0.034439936,0.16674621,0.053197306,0.49276468],"study_design_scores_gemma":[0.00004076795,0.00024419607,0.28204206,0.00014260794,0.000113076814,0.0017892291,0.00065115973,0.46967822,0.038729165,0.044065293,0.16209075,0.0004135472],"about_ca_topic_score_codex":0.00765863,"about_ca_topic_score_gemma":0.012819011,"teacher_disagreement_score":0.00765863,"about_ca_system_score_codex":0.0014937987,"about_ca_system_score_gemma":0.001345442,"threshold_uncertainty_score":0.015228093},"labels":[],"label_agreement":null},{"id":"W1619770729","doi":"","title":"Managing Innovative Distance Education Projects in a Telework Environment","year":2010,"lang":"en","type":"article","venue":"International journal of e-learning & distance education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Scope (computer science); Project management; Work (physics); Political science; Teamwork; Engineering management; Business; Engineering; Process management; Computer science; Systems engineering","score_opus":0.004230759181651962,"score_gpt":0.23461427181864178,"score_spread":0.2303835126369898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1619770729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.73933053,0.0015292948,0.17026445,0.0027936958,0.00040726393,0.0018010201,0.00013528697,0.00062871433,0.08310978],"genre_scores_gemma":[0.8059746,0.0014818577,0.15226889,0.00021691297,0.00016413302,0.0011828875,0.00026547097,0.00012758796,0.038317736],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99665004,0.0012918356,0.00024295405,0.0003080223,0.0009380592,0.0005691356],"domain_scores_gemma":[0.99158305,0.001291586,0.0010283515,0.0006285809,0.0013513212,0.0041170525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003796776,0.0005218541,0.00026520956,0.0011108383,0.0031310474,0.0047854874,0.0021485302,0.0012556016,0.0077926205],"category_scores_gemma":[0.006392111,0.00033867516,0.00045789083,0.0007880868,0.00077009684,0.0029567133,0.005491899,0.001127964,0.0018203562],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040080896,0.0030631283,0.027145527,0.0009176691,0.000110507324,0.0023077414,0.015692223,0.018000778,0.010610302,0.011527935,0.017196905,0.89302653],"study_design_scores_gemma":[0.0008544812,0.009659046,0.10887654,0.002027005,0.000265435,0.0064473,0.12823355,0.069841884,0.022110779,0.050854743,0.6004072,0.00042212842],"about_ca_topic_score_codex":0.0007170423,"about_ca_topic_score_gemma":0.0014578557,"teacher_disagreement_score":0.0077926205,"about_ca_system_score_codex":0.0017122395,"about_ca_system_score_gemma":0.0044196434,"threshold_uncertainty_score":0.026068926},"labels":[],"label_agreement":null},{"id":"W1635743658","doi":"10.1109/nafips-wconsc.2015.7284151","title":"Integrating Fuzzy Logic and agent-based modeling for assessing construction crew behavior","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Fuzzy logic; Computer science; Multi-agent system; Behavioral modeling; Artificial intelligence; Systems engineering; Engineering","score_opus":0.054601741443111904,"score_gpt":0.27980562261973346,"score_spread":0.22520388117662155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1635743658","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038114674,0.00018065766,0.9546084,0.00024257251,0.000026038617,0.000108314554,0.00008937405,0.00014824793,0.0064817593],"genre_scores_gemma":[0.74188155,0.00038060342,0.25507662,0.00007301859,0.000023605367,0.00027654498,0.0001402435,0.000024328821,0.002123511],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993777,0.00025931324,0.000037673457,0.00006201005,0.00022107465,0.00004217956],"domain_scores_gemma":[0.99923754,0.0004204359,0.00011814993,0.000042854048,0.0001466403,0.000034378674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001164342,0.00066792336,0.00051022385,0.0012785863,0.0005153541,0.0014499072,0.0010505519,0.0008748544,0.0012145513],"category_scores_gemma":[0.0024778952,0.0002988042,0.0006849575,0.0006995868,0.0005032677,0.0011726907,0.0006200744,0.00056338205,0.00016813494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003173975,0.00006991618,0.0032134587,0.000058737867,0.00006971956,0.00008816219,0.00017630562,0.94023055,0.0015154894,0.030615743,0.00032560402,0.023604603],"study_design_scores_gemma":[0.0000043879345,0.000014609539,0.00030368924,0.00001000335,0.000011335335,0.000011853764,0.000034409004,0.9905171,0.00024699935,0.008304327,0.0005315281,0.000009693444],"about_ca_topic_score_codex":0.017924301,"about_ca_topic_score_gemma":0.015835883,"teacher_disagreement_score":0.017924301,"about_ca_system_score_codex":0.0015580151,"about_ca_system_score_gemma":0.0014990803,"threshold_uncertainty_score":0.03563994},"labels":[],"label_agreement":null},{"id":"W16601101","doi":"10.1073/pnas.0510337103","title":"APPLICATION OF GAMING ENGINES IN SIMULATION DRIVEN VISUALIZATION OF CONSTRUCTION OPERATIONS","year":2011,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Flexibility (engineering); Computer science; Representation (politics); Component (thermodynamics); Systems engineering; Human–computer interaction; Engineering; Data mining","score_opus":0.006411177422959225,"score_gpt":0.2237875179427445,"score_spread":0.2173763405197853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W16601101","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14617923,0.00011923165,0.83378386,0.00030957424,0.000040841864,0.00009787826,0.00016908009,0.0032449479,0.016055342],"genre_scores_gemma":[0.78883284,0.00014977982,0.20880818,0.000048133214,0.0000075652174,0.00007727922,0.000128991,0.00023495189,0.0017122728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997435,0.000104453946,0.0000153036,0.000034067147,0.0000757809,0.00002684662],"domain_scores_gemma":[0.99933594,0.00036626728,0.000039782197,0.00012290844,0.000087111584,0.000048038317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047869066,0.0005297647,0.0003549588,0.00048653962,0.0003937741,0.001256919,0.00077244686,0.00047665852,0.005151528],"category_scores_gemma":[0.0022902233,0.00035304006,0.00039289912,0.00032116944,0.0006982849,0.000981813,0.0014333193,0.00055693596,0.00037721224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005135149,0.00019617427,0.0045879665,0.00018847482,0.00008366116,0.00069439906,0.001503455,0.48075846,0.06440785,0.31734443,0.0025715306,0.12715006],"study_design_scores_gemma":[0.000013954945,0.000023480317,0.00028857013,0.000018002624,0.0000064609862,0.000057703517,0.00005396722,0.9614444,0.0101016825,0.024667177,0.003312149,0.000012422893],"about_ca_topic_score_codex":0.00271046,"about_ca_topic_score_gemma":0.0026878,"teacher_disagreement_score":0.005151528,"about_ca_system_score_codex":0.00059873407,"about_ca_system_score_gemma":0.00056777033,"threshold_uncertainty_score":0.01723361},"labels":[],"label_agreement":null},{"id":"W1706103706","doi":"10.1016/j.autcon.2015.07.023","title":"Queue performance measures in construction simulation models containing subjective uncertainty","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Queueing theory; Discrete event simulation; Fuzzy logic; Queue; Computer science; Vagueness; Fuzzy set; Event (particle physics); Operations research; Mathematical optimization; Engineering; Simulation; Mathematics; Artificial intelligence","score_opus":0.028349473416736236,"score_gpt":0.24084852429054276,"score_spread":0.21249905087380652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1706103706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29979986,0.0008249713,0.69485396,0.0008833751,0.00013731772,0.00006987872,0.00039819285,0.00034195266,0.0026904868],"genre_scores_gemma":[0.9884052,0.00019233963,0.00976027,0.00005575777,0.000040828676,0.00004437671,0.0002568544,0.00005807525,0.001186339],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975169,0.0012028555,0.00015883699,0.0003675501,0.00036769576,0.0003861604],"domain_scores_gemma":[0.9583318,0.03383413,0.0030889467,0.00089742296,0.0028356423,0.0010120258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010891863,0.0011733415,0.001522631,0.001685424,0.00073863193,0.003058686,0.001973979,0.002299165,0.0015977398],"category_scores_gemma":[0.04443615,0.0008197977,0.00093717215,0.0014366392,0.0014400712,0.003402026,0.0015162613,0.0015112257,0.00017363252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007944806,0.000036749458,0.0015552007,0.000028955088,0.00002858687,0.000027898517,0.000051088227,0.981077,0.00023173649,0.014795944,0.00025270577,0.001834744],"study_design_scores_gemma":[0.0000032157454,0.000014329932,0.0002331551,0.0000036211193,0.0000068257737,0.0000027188778,0.000008351412,0.9971328,0.000072906565,0.0024845223,0.00003099918,0.0000066516945],"about_ca_topic_score_codex":0.016857626,"about_ca_topic_score_gemma":0.007951784,"teacher_disagreement_score":0.016857626,"about_ca_system_score_codex":0.0036004542,"about_ca_system_score_gemma":0.0021654447,"threshold_uncertainty_score":0.057602406},"labels":[],"label_agreement":null},{"id":"W1712564812","doi":"","title":"Virtual collaboration in the built environment","year":2014,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Plan (archaeology); Higher education; Focus group; Engineering; Engineering management; Sociology; Medical education; Library science; Public relations; Political science; Computer science; Medicine","score_opus":0.010772711085207122,"score_gpt":0.20220906354715812,"score_spread":0.191436352461951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1712564812","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4484228,0.0050896937,0.06425779,0.0053926115,0.0007261062,0.00020781142,0.00018662555,0.00070419285,0.47501242],"genre_scores_gemma":[0.97767544,0.0006611053,0.007419695,0.00027724067,0.000066863824,0.000100311714,0.00006140512,0.000052646945,0.0136852255],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99214524,0.0057889996,0.0001354327,0.00046407292,0.00073348894,0.0007327021],"domain_scores_gemma":[0.9954461,0.0015962421,0.0003409978,0.00086217985,0.00026595648,0.0014885075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043076286,0.00034397963,0.00032565338,0.0011209431,0.0055502383,0.009826459,0.0010672093,0.0014831603,0.017691055],"category_scores_gemma":[0.0057842187,0.00028437257,0.00035448367,0.0011406841,0.0049635284,0.00533512,0.016836205,0.0009234366,0.0017021747],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004075258,0.0004896269,0.026405854,0.0009545191,0.000119876895,0.0018536431,0.16406414,0.007323156,0.0035474699,0.34105742,0.03901333,0.41476345],"study_design_scores_gemma":[0.00011399231,0.00071256346,0.01841756,0.0008690769,0.000072582756,0.0021462475,0.11028139,0.0056231096,0.0018737185,0.12061265,0.73912346,0.00015362665],"about_ca_topic_score_codex":0.0017545009,"about_ca_topic_score_gemma":0.0036460334,"teacher_disagreement_score":0.017691055,"about_ca_system_score_codex":0.0013987095,"about_ca_system_score_gemma":0.0022893166,"threshold_uncertainty_score":0.059182465},"labels":[],"label_agreement":null},{"id":"W1778739278","doi":"","title":"A COURSE ON COMPUTER-AIDED BUILDING DESIGN","year":2004,"lang":"en","type":"article","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Course (navigation); Context (archaeology); Building design; Process (computing); Building information modeling; Engineering; Computer Aided Design; Software; Engineering design process; Architectural engineering; Design process; Engineering management; Systems engineering; Software engineering; Computer science; Work in process; Operations management","score_opus":0.011644720381399508,"score_gpt":0.22508304139386193,"score_spread":0.2134383210124624,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1778739278","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018547125,0.007915823,0.05223688,0.010739518,0.0076137516,0.0009412852,0.0018597625,0.0034392455,0.89670664],"genre_scores_gemma":[0.033196256,0.005495123,0.023868052,0.0023842233,0.0013195894,0.0004339714,0.0022815818,0.0004751573,0.9305459],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99942076,0.000063175896,0.000026578355,0.00011367866,0.00024652624,0.00012937952],"domain_scores_gemma":[0.9989926,0.000088305,0.00002719237,0.000072406154,0.00038637943,0.00043315612],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008723152,0.0020461902,0.0014482554,0.0012775247,0.0015126877,0.0026159498,0.0012757787,0.0015859379,0.1316872],"category_scores_gemma":[0.0016593515,0.0005677068,0.0008573703,0.0011705909,0.00061544636,0.0011936756,0.0021485372,0.0024610127,0.06888334],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016158888,0.0011715587,0.0014316711,0.00034496575,0.000011145092,0.00030372987,0.0006287187,0.0017923302,0.006156211,0.014838599,0.61022544,0.36293402],"study_design_scores_gemma":[0.000023056036,0.00032208953,0.0041457396,0.00027407036,0.000007730181,0.0004249304,0.00021658039,0.001480753,0.0014205355,0.0070449314,0.98462313,0.000016484166],"about_ca_topic_score_codex":0.0027101405,"about_ca_topic_score_gemma":0.006749441,"teacher_disagreement_score":0.1316872,"about_ca_system_score_codex":0.0019301901,"about_ca_system_score_gemma":0.002808095,"threshold_uncertainty_score":0.44053757},"labels":[],"label_agreement":null},{"id":"W185334221","doi":"","title":"Beheren 2.0: Beheren van bouwwerken met BIM","year":2014,"lang":"en","type":"article","venue":"Research Repository (Delft University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Interoperability; Construction industry; Process (computing); Process management; Construct (python library); Business; Information exchange; Engineering; Construction engineering; Knowledge management; Engineering management; Computer science; Operations management; World Wide Web","score_opus":0.012947186648230276,"score_gpt":0.22638593630966558,"score_spread":0.2134387496614353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W185334221","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006452799,0.008756865,0.4190636,0.0045175054,0.0018171782,0.0010319566,0.07954834,0.16532159,0.31349024],"genre_scores_gemma":[0.08735905,0.012149374,0.3706985,0.0028787667,0.0008260814,0.0030017085,0.15519899,0.17426622,0.19362125],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99541914,0.00088317203,0.00044499148,0.0005157592,0.0022988757,0.00043806538],"domain_scores_gemma":[0.9980452,0.0007632321,0.000121022626,0.00034287502,0.00049934676,0.00022828119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036184022,0.0028283428,0.0017007047,0.0027699603,0.001294236,0.013584534,0.0034193452,0.003704691,0.16335179],"category_scores_gemma":[0.010093554,0.0027899754,0.0019607898,0.0039317156,0.0011404059,0.008298352,0.007910692,0.003579765,0.09829723],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004813808,0.00023980417,0.0011715802,0.0042362944,0.0002063428,0.0011600205,0.00472161,0.009480664,0.0069132894,0.108678244,0.5700656,0.29264513],"study_design_scores_gemma":[0.000059200655,0.000012132615,0.00029513682,0.00029488924,0.000023438699,0.0001858724,0.00021151497,0.003956941,0.0018609803,0.011707163,0.9813293,0.00006351909],"about_ca_topic_score_codex":0.011170412,"about_ca_topic_score_gemma":0.010375777,"teacher_disagreement_score":0.16335179,"about_ca_system_score_codex":0.0013882311,"about_ca_system_score_gemma":0.002276126,"threshold_uncertainty_score":0.5464662},"labels":[],"label_agreement":null},{"id":"W186078822","doi":"","title":"2039 RESPONSE PREDICTION AND EXPERIMENTAL RESULTS OF A ONE-BAY REINFORCED CONCRETE FRAME","year":2006,"lang":"ja","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bay; Frame (networking); Geology; Engineering; Oceanography; Telecommunications","score_opus":0.007727109664399615,"score_gpt":0.20908923563537624,"score_spread":0.2013621259709766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W186078822","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9967045,0.000028328588,0.0022219797,0.000013764891,0.000007430972,0.000018712451,0.000106261956,0.00012433072,0.00077466265],"genre_scores_gemma":[0.9980269,0.0000264722,0.0011658588,0.000004883233,0.0000014799319,0.000013093659,0.000098181095,0.000011545045,0.0006516696],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936134,0.000109835935,0.000033210737,0.00008572512,0.00030613685,0.000103728795],"domain_scores_gemma":[0.9991959,0.00024726486,0.00009712728,0.00011948136,0.00027681317,0.00006345843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009879034,0.0008386424,0.00042929745,0.00057755644,0.00023593214,0.00019375536,0.00081509404,0.000733605,0.003033298],"category_scores_gemma":[0.0012640968,0.00027972306,0.000298454,0.00029494532,0.0004958062,0.0002858298,0.00028422757,0.00030823285,0.000832837],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016751745,0.00091401517,0.013644599,0.00030909,0.000020460719,0.00055856514,0.00061165367,0.12296025,0.83489984,0.00026323815,0.0004889402,0.023654133],"study_design_scores_gemma":[0.00011808416,0.0051672724,0.032363277,0.00003169683,0.00006277146,0.0001620863,0.00027510285,0.24745677,0.71329725,0.000083491555,0.00092888664,0.000053361768],"about_ca_topic_score_codex":0.0023074886,"about_ca_topic_score_gemma":0.0039989217,"teacher_disagreement_score":0.003033298,"about_ca_system_score_codex":0.00038703976,"about_ca_system_score_gemma":0.00025842394,"threshold_uncertainty_score":0.010147452},"labels":[],"label_agreement":null},{"id":"W1868619901","doi":"10.3233/jid-2003-7306","title":"A DISTRIBUTED MULTIDISCIPLINARY DESIGN OPTIMIZATION FRAMEWORK: TECHNOLOGY INTEGRATION","year":2003,"lang":"en","type":"article","venue":"Journal of Integrated Design and Process Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University; National Research Council Canada","funders":"","keywords":"Multidisciplinary approach; Multidisciplinary design optimization; Systems engineering; Computer science; Engineering","score_opus":0.015283747510709237,"score_gpt":0.25484517028735376,"score_spread":0.23956142277664452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1868619901","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010907698,0.00018525403,0.9956397,0.00014739373,0.000016595162,0.00004610075,0.000021778695,0.00025956874,0.0025928842],"genre_scores_gemma":[0.054882646,0.00042009994,0.94208294,0.000065373584,0.000035894638,0.0003635083,0.000112010566,0.00009694159,0.0019405839],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988244,0.0004192285,0.00007727816,0.00015225168,0.00044809707,0.00007870575],"domain_scores_gemma":[0.99960107,0.0001386188,0.000038571616,0.00008453652,0.00008887167,0.000048353675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022608612,0.00093804224,0.0007929534,0.001112228,0.0008246554,0.0024514778,0.002153539,0.0014232458,0.0030939614],"category_scores_gemma":[0.0015785408,0.00053079985,0.001220067,0.0013163816,0.0010910778,0.0021665196,0.002116099,0.0012066392,0.00064497645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004431697,0.00012206739,0.0005087922,0.00026345218,0.00008456321,0.00015642642,0.00026688655,0.48164204,0.0035929303,0.37294906,0.00268035,0.13768922],"study_design_scores_gemma":[0.00007423891,0.000048457267,0.00016694711,0.00007011466,0.000033298442,0.00010118642,0.000053487787,0.8275698,0.0011557268,0.13015696,0.04054037,0.00002949862],"about_ca_topic_score_codex":0.0035018525,"about_ca_topic_score_gemma":0.0038958609,"teacher_disagreement_score":0.0035018525,"about_ca_system_score_codex":0.0013831424,"about_ca_system_score_gemma":0.0025386203,"threshold_uncertainty_score":0.011956751},"labels":[],"label_agreement":null},{"id":"W1870705533","doi":"10.24908/pceea.v0i0.3633","title":"Teaching Building Design and Construction Engineering. Are we ready for the paradigm shift?","year":2011,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; University of British Columbia; McGill University","funders":"","keywords":"Curriculum; Architecture; Engineering; Bridge (graph theory); Engineering management; Building information modeling; Design studio; Studio; Multidisciplinary approach; Paradigm shift; Engineering ethics; Architectural engineering; Operations management; Sociology; Pedagogy","score_opus":0.016969691965954745,"score_gpt":0.203371371467458,"score_spread":0.18640167950150327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1870705533","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013939854,0.12472814,0.024985984,0.507067,0.00888709,0.00007460576,0.00010649729,0.00038529842,0.31982547],"genre_scores_gemma":[0.4323695,0.16840366,0.07840783,0.08423762,0.0040448233,0.00019427857,0.0002822577,0.00045931907,0.23160082],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9935638,0.0022103617,0.00014514478,0.00044844215,0.0026856204,0.000946647],"domain_scores_gemma":[0.9954798,0.0010834635,0.00023596945,0.00042928875,0.0008691683,0.0019022985],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006316211,0.00069530134,0.0006923846,0.0014113965,0.0064743473,0.0118646035,0.0019334473,0.0035687995,0.011088304],"category_scores_gemma":[0.006269433,0.00039647333,0.0005109753,0.0029718648,0.024816433,0.006468198,0.004512302,0.0060617784,0.0037352126],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034437395,0.00020540097,0.0027572392,0.00096859765,0.000024107483,0.00021304066,0.028590245,0.0008456174,0.00092316134,0.32888237,0.17398742,0.4625683],"study_design_scores_gemma":[0.000008425577,0.00002906889,0.0017301234,0.00062621635,0.00000820022,0.00013403008,0.016826095,0.00017880743,0.00021954377,0.07032567,0.9098957,0.00001812959],"about_ca_topic_score_codex":0.32944414,"about_ca_topic_score_gemma":0.5398292,"teacher_disagreement_score":0.32944414,"about_ca_system_score_codex":0.030692564,"about_ca_system_score_gemma":0.050340615,"threshold_uncertainty_score":0.65505314},"labels":[],"label_agreement":null},{"id":"W189148624","doi":"","title":"Construction and cataloguing of nested partially balanced incomplete block designs","year":2004,"lang":"en","type":"article","venue":"Ars Combinatoria","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Block (permutation group theory); Mathematics; Arithmetic; Combinatorics","score_opus":0.011209438732090444,"score_gpt":0.2035605862339142,"score_spread":0.19235114750182378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W189148624","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035397798,0.00012236254,0.95218027,0.000044552515,0.000027913078,0.00013957579,0.00028747233,0.0005880385,0.011211975],"genre_scores_gemma":[0.2729105,0.00023810884,0.7095966,0.00004955341,0.000018328747,0.00030234418,0.0009708996,0.00032884098,0.015584897],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99788254,0.00050089875,0.0001996588,0.00031295887,0.000910451,0.0001934831],"domain_scores_gemma":[0.9977041,0.00053911476,0.00022627747,0.0008298954,0.00059537194,0.000105140425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020018464,0.00055563427,0.0014732435,0.0018238644,0.0011222701,0.0025118636,0.0015580151,0.00073349243,0.0068313014],"category_scores_gemma":[0.004468429,0.00079613755,0.0010395027,0.0021595522,0.0012588924,0.0024909747,0.0023354192,0.0008506962,0.0016147201],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016290342,0.00012890114,0.0012722985,0.00023226315,0.000038271977,0.0002380007,0.000542692,0.050534192,0.012258723,0.7157837,0.0027394418,0.21606863],"study_design_scores_gemma":[0.00009504715,0.00028613477,0.00086459133,0.00017845933,0.00013180923,0.0004842163,0.00040173501,0.31535974,0.0429349,0.5637135,0.07546549,0.00008430643],"about_ca_topic_score_codex":0.002077831,"about_ca_topic_score_gemma":0.00414458,"teacher_disagreement_score":0.0068313014,"about_ca_system_score_codex":0.0009872537,"about_ca_system_score_gemma":0.0018719061,"threshold_uncertainty_score":0.022852957},"labels":[],"label_agreement":null},{"id":"W1897731987","doi":"10.24908/pceea.v0i0.3996","title":"LA RECHERCHE D'UNE VALEUR AJOUTÉE CACHÉE DANS UN PROJET DE GÉNIE CIVIL","year":2011,"lang":"fr","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Philosophy; Art","score_opus":0.04041769888343799,"score_gpt":0.2336365386237882,"score_spread":0.1932188397403502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1897731987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40221876,0.0011767669,0.5363136,0.0013326926,0.00019400929,0.00028133372,0.00025354236,0.0010813599,0.05714794],"genre_scores_gemma":[0.71032184,0.0011035372,0.26272377,0.0001384998,0.000022689022,0.00020298132,0.00037652958,0.00041024433,0.02469991],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9910239,0.0020994733,0.00040857863,0.00085642206,0.005223509,0.00038812804],"domain_scores_gemma":[0.97733307,0.011542762,0.001401082,0.0020995694,0.0070647593,0.00055874453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063586636,0.0010394853,0.00076564756,0.0027611586,0.0020781416,0.006321726,0.0011473049,0.0020885875,0.006762045],"category_scores_gemma":[0.023018721,0.00084899727,0.0011446042,0.0026977821,0.0027505714,0.0047211153,0.0028526508,0.002223866,0.001340752],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006513884,0.0006751399,0.043131202,0.0034651079,0.00021894401,0.0034482,0.080726966,0.027866194,0.1637761,0.124056935,0.005335031,0.54664886],"study_design_scores_gemma":[0.00014862994,0.0027071668,0.09122728,0.0027901477,0.0006119916,0.00940987,0.075029284,0.11250274,0.3628046,0.04955347,0.29245722,0.000757651],"about_ca_topic_score_codex":0.011369285,"about_ca_topic_score_gemma":0.026736282,"teacher_disagreement_score":0.011369285,"about_ca_system_score_codex":0.0025032237,"about_ca_system_score_gemma":0.0051363963,"threshold_uncertainty_score":0.033628225},"labels":[],"label_agreement":null},{"id":"W1910474328","doi":"10.14359/51686448","title":"Computer-Aided Mold Design Algorithm for Precast Concrete Elements","year":2014,"lang":"en","type":"article","venue":"ACI Materials Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Geography; Sierra leone; Ancient history; Environmental protection; Ethnology; History","score_opus":0.016173680046957673,"score_gpt":0.22015717518067768,"score_spread":0.20398349513372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1910474328","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010185329,0.00010681949,0.98204523,0.00004205692,0.000028212478,0.00011448032,0.00013146416,0.0015474444,0.0057988586],"genre_scores_gemma":[0.16585156,0.00014098363,0.82208693,0.00004271813,0.000011470957,0.00027044304,0.000587997,0.0003568769,0.010650949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999734,0.000035803667,0.000015597909,0.00004669554,0.0001355195,0.00003238589],"domain_scores_gemma":[0.99961036,0.0001692896,0.000030267203,0.000037940634,0.00013991997,0.000012230467],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004074787,0.0010627082,0.00075818977,0.0009502282,0.00041080097,0.00083841867,0.00097472244,0.0008539643,0.015927685],"category_scores_gemma":[0.0010808675,0.00053451525,0.0009833238,0.00047321265,0.0003240028,0.00052398717,0.00072591833,0.00081128516,0.0034694984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009927709,0.000048610043,0.0010835977,0.0002153443,0.000029308629,0.00011627861,0.00013355714,0.6406493,0.012014699,0.0057589463,0.0035099592,0.33634102],"study_design_scores_gemma":[0.000013907273,0.000046503166,0.00016515193,0.000019856208,0.000008700185,0.000056935427,0.0000350136,0.989325,0.003486988,0.0020491641,0.004785801,0.0000069816147],"about_ca_topic_score_codex":0.004042794,"about_ca_topic_score_gemma":0.0075043594,"teacher_disagreement_score":0.015927685,"about_ca_system_score_codex":0.00042383853,"about_ca_system_score_gemma":0.0011569153,"threshold_uncertainty_score":0.053283393},"labels":[],"label_agreement":null},{"id":"W1911228455","doi":"10.1139/l2012-042","title":"Fleet selection for earthmoving projects using optimization-based simulation","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Global Positioning System; Truck; Scope (computer science); Engineering; Cost estimate; Software; Duration (music); Work (physics); Transport engineering; Operations research; Computer science; Simulation; Systems engineering; Automotive engineering","score_opus":0.014553981764116907,"score_gpt":0.20521750130864144,"score_spread":0.19066351954452454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1911228455","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16408618,0.00024309003,0.81223714,0.00027244166,0.00004331815,0.00032002406,0.0007794761,0.00079305016,0.021225348],"genre_scores_gemma":[0.8800136,0.00038063613,0.110464565,0.000057713016,0.000012501996,0.0004927033,0.00087536336,0.00016383718,0.0075390073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997086,0.000113598355,0.000015817532,0.000046237044,0.00006856966,0.000047152946],"domain_scores_gemma":[0.99956495,0.00022386806,0.00007171533,0.000025671581,0.000074855656,0.000038935847],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055505655,0.0007681311,0.00094002625,0.0007122427,0.0005228013,0.0010846794,0.0010405534,0.0008292553,0.0038785876],"category_scores_gemma":[0.0011652773,0.0005266447,0.00088881596,0.0007640109,0.00035873594,0.00085178955,0.0006073542,0.00065989635,0.00038727836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005897096,0.000005057695,0.00015327308,0.0000033202343,0.0000026935402,0.0000069611656,0.0000035511662,0.9986539,0.0000644091,0.00025389937,0.000040910272,0.00080608367],"study_design_scores_gemma":[0.0000031258717,0.000005661896,0.00006950645,0.0000017663954,0.0000022020013,0.0000021811156,0.0000038640246,0.9994748,0.00007988274,0.00016139989,0.00019363165,0.0000020340317],"about_ca_topic_score_codex":0.03616705,"about_ca_topic_score_gemma":0.027977467,"teacher_disagreement_score":0.03616705,"about_ca_system_score_codex":0.001501504,"about_ca_system_score_gemma":0.0016934518,"threshold_uncertainty_score":0.07191306},"labels":[],"label_agreement":null},{"id":"W1914395968","doi":"","title":"BEST PAPER / MEILLEURE COMMUNICATION: Development of a Classification System for Patients Referred to a Rehabilitation Program for Visual Impairment : A Method for Analysis and Budget Control","year":2009,"lang":"en","type":"article","venue":"ASAC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Rehabilitation; Visual impairment; Physical medicine and rehabilitation; Control (management); Computer science; Psychology; Artificial intelligence; Audiology; Speech recognition; Medicine; Physical therapy; Psychiatry","score_opus":0.010992285263839342,"score_gpt":0.2989241828829373,"score_spread":0.287931897619098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1914395968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18946901,0.0034209876,0.452548,0.09784531,0.064272806,0.008467101,0.034058586,0.0070646787,0.14285357],"genre_scores_gemma":[0.3097996,0.001921926,0.46598926,0.005949986,0.005313401,0.0039948607,0.015754182,0.0019690734,0.18930791],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99667066,0.0008934974,0.0005715218,0.00020693622,0.0015431148,0.00011426883],"domain_scores_gemma":[0.9801364,0.0043308185,0.0010784733,0.001029835,0.0127856415,0.00063897367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061913407,0.00074040925,0.00055404066,0.0041678073,0.0011390515,0.0022031676,0.0010226454,0.0013305303,0.038342487],"category_scores_gemma":[0.03265663,0.00029013984,0.00070653995,0.0015682994,0.0005925908,0.0016463444,0.0009223607,0.0011896029,0.01018278],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034069095,0.00028598445,0.02423677,0.00026795643,0.000042847358,0.00021278854,0.00047809118,0.0010150765,0.002114892,0.001991812,0.47031513,0.49869806],"study_design_scores_gemma":[0.00058993936,0.0019316132,0.22135901,0.0013757847,0.00044237357,0.0040608863,0.004249729,0.044899177,0.033763226,0.011665627,0.67497647,0.00068618945],"about_ca_topic_score_codex":0.007717259,"about_ca_topic_score_gemma":0.010781552,"teacher_disagreement_score":0.038342487,"about_ca_system_score_codex":0.0012027846,"about_ca_system_score_gemma":0.0030392723,"threshold_uncertainty_score":0.12826836},"labels":[],"label_agreement":null},{"id":"W1916505624","doi":"10.22260/isarc2015/0065","title":"Robotic Kinematics Analogy for Realignment of Defective Construction Assemblies","year":2015,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Kinematics; Inverse kinematics; Computer science; Analogy; Robotics; Artificial intelligence; Degrees of freedom (physics and chemistry); State (computer science); Robot; Download; Programming language; Operating system","score_opus":0.022008234063471944,"score_gpt":0.22904870889861603,"score_spread":0.2070404748351441,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1916505624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008883442,0.00006423016,0.98677164,0.000043832002,0.00002515155,0.000043294913,0.000014107099,0.00078705786,0.003367139],"genre_scores_gemma":[0.41654763,0.00015073965,0.57887095,0.0000377295,0.000015653268,0.00011480514,0.00008342882,0.00014809896,0.0040309774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937767,0.00010710871,0.000030237772,0.00013838179,0.00030632407,0.00004026191],"domain_scores_gemma":[0.9996458,0.000099974095,0.000077858196,0.00010431244,0.000055626457,0.000016381307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00061311,0.0005536484,0.00043984482,0.00062713755,0.00038605553,0.00068536337,0.00097417337,0.00066943245,0.0025581766],"category_scores_gemma":[0.0012444415,0.00042109293,0.00051895704,0.00027208767,0.0011502634,0.0008901915,0.00087250554,0.00077661185,0.00057152077],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015828594,0.00015232347,0.00088977534,0.00023035608,0.00002328749,0.00036144542,0.0007235974,0.54569197,0.14175037,0.14265072,0.001103435,0.16626443],"study_design_scores_gemma":[0.000024648441,0.00026852114,0.0009979635,0.000034029545,0.000018473967,0.00040414862,0.00009191834,0.90232694,0.056253366,0.02373598,0.015797028,0.000046978552],"about_ca_topic_score_codex":0.001350839,"about_ca_topic_score_gemma":0.0013412207,"teacher_disagreement_score":0.0025581766,"about_ca_system_score_codex":0.0005084923,"about_ca_system_score_gemma":0.00073593605,"threshold_uncertainty_score":0.008557916},"labels":[],"label_agreement":null},{"id":"W1916836594","doi":"","title":"Engineering and Acoustic Design Experts","year":2015,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural acoustics; Engineering; Telecommunications; Acoustics; Business; Electrical engineering; Physics","score_opus":0.017880789223244993,"score_gpt":0.18035080372890672,"score_spread":0.16247001450566173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1916836594","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0091878725,0.010975385,0.077991724,0.042401697,0.03412559,0.00080599095,0.0050640423,0.0050993664,0.81434834],"genre_scores_gemma":[0.012675519,0.0024378677,0.010425633,0.003876164,0.0009604113,0.00010554509,0.001081786,0.00048064708,0.9679565],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.98875207,0.0005623456,0.00043991278,0.0008977126,0.008302382,0.0010456281],"domain_scores_gemma":[0.9709727,0.00055353006,0.0003033145,0.0009770334,0.022845043,0.0043484503],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0050614104,0.001585091,0.0010833291,0.0033975795,0.003787958,0.0045555276,0.0021372307,0.0021221086,0.29952058],"category_scores_gemma":[0.009344411,0.00084794173,0.00085687294,0.0022738706,0.0016845681,0.0020883796,0.0025365648,0.002006691,0.1216719],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075221484,0.00007648588,0.00087580876,0.00032444185,0.000010839597,0.0003210696,0.0005108648,0.0008427833,0.0073942337,0.0041562053,0.76106733,0.22434475],"study_design_scores_gemma":[0.000006231305,0.000014912486,0.00060105487,0.000049286144,0.0000057756315,0.00021061077,0.00028216504,0.00035800808,0.00080231536,0.0007363004,0.9969188,0.00001451714],"about_ca_topic_score_codex":0.101618916,"about_ca_topic_score_gemma":0.39475104,"teacher_disagreement_score":0.29952058,"about_ca_system_score_codex":0.010166375,"about_ca_system_score_gemma":0.02803523,"threshold_uncertainty_score":0.9991489},"labels":[],"label_agreement":null},{"id":"W1923587564","doi":"","title":"Expertises en ingénierie et design acoustique","year":2015,"lang":"fr","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Humanities; Political science; Physics; Art","score_opus":0.03120220944071651,"score_gpt":0.23865563335705356,"score_spread":0.20745342391633706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1923587564","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06527709,0.00988085,0.06802933,0.0127019845,0.00048689172,0.00016453993,0.00082121266,0.0012646619,0.8413735],"genre_scores_gemma":[0.3489384,0.011019098,0.06019043,0.001943755,0.00022476415,0.00012445501,0.00094877335,0.0004131846,0.5761972],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9919337,0.0008088736,0.0002752747,0.00091562036,0.00513472,0.0009318619],"domain_scores_gemma":[0.9909985,0.0016338115,0.00034568232,0.0007762262,0.0047484683,0.00149728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005063029,0.0009557506,0.0008440129,0.003005836,0.0055194306,0.006480335,0.0011916488,0.0020382525,0.041802425],"category_scores_gemma":[0.007519081,0.0007601873,0.00044508875,0.004069796,0.0064787082,0.0023297898,0.0050874315,0.0020399983,0.008021516],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011934554,0.00025412787,0.017653124,0.00085917313,0.000049266062,0.00049136765,0.02416516,0.0046723727,0.015149627,0.09734013,0.08474955,0.7544969],"study_design_scores_gemma":[0.000013061263,0.00007951095,0.019914744,0.00032535597,0.000018902156,0.00041554577,0.006137972,0.001726639,0.0031044295,0.00946001,0.95873237,0.00007157285],"about_ca_topic_score_codex":0.60547966,"about_ca_topic_score_gemma":0.77849,"teacher_disagreement_score":0.60547966,"about_ca_system_score_codex":0.01950261,"about_ca_system_score_gemma":0.04902763,"threshold_uncertainty_score":0.79368746},"labels":[],"label_agreement":null},{"id":"W1938740575","doi":"10.1016/j.proeng.2015.08.450","title":"A Building Information Management (BIM) Framework and Supporting Case Study for Existing Building Operations, Maintenance and Sustainability","year":2015,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":185,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Facility management; Documentation; Systems engineering; Information model; Process (computing); Construction engineering; Process management; Building design; Key (lock); Building management; Sustainability; Computer science; Engineering; Engineering management; Risk analysis (engineering); Scheduling (production processes); Architectural engineering; Software engineering; Operations management","score_opus":0.012360789326435506,"score_gpt":0.2648918829771005,"score_spread":0.25253109365066495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1938740575","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47608876,0.0006748196,0.3766743,0.0024730882,0.000090097696,0.002071257,0.002621275,0.00088231225,0.138424],"genre_scores_gemma":[0.7096357,0.00044905426,0.28102815,0.00007057326,0.000011533971,0.00051856117,0.000900656,0.00009427233,0.007291617],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99825317,0.00087771815,0.0000796826,0.000094312265,0.00054260436,0.00015235641],"domain_scores_gemma":[0.9985366,0.000801302,0.00008671969,0.00025523044,0.00019469252,0.00012539022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024593438,0.000513332,0.00034017774,0.001948445,0.002661276,0.0023098863,0.0014476604,0.0018295271,0.0047808364],"category_scores_gemma":[0.0033717572,0.0003447081,0.00047581803,0.0033886335,0.001625487,0.0027282736,0.0018055565,0.0010169549,0.00059078925],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035834967,0.0018494535,0.016909285,0.00085007993,0.000045245913,0.011264933,0.016829802,0.3223099,0.009281293,0.35164848,0.015281683,0.25337148],"study_design_scores_gemma":[0.0001290292,0.0005976323,0.018743273,0.0008259771,0.00009858419,0.005699144,0.027124504,0.53778666,0.02447053,0.0812384,0.30301967,0.0002666148],"about_ca_topic_score_codex":0.019625174,"about_ca_topic_score_gemma":0.04621208,"teacher_disagreement_score":0.019625174,"about_ca_system_score_codex":0.0038201294,"about_ca_system_score_gemma":0.0033163698,"threshold_uncertainty_score":0.03902191},"labels":[],"label_agreement":null},{"id":"W1939123876","doi":"","title":"WSP GLOBAL – Acoustic, Noise and Vibration Services","year":2015,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Excellence; Noise control; Status quo; Engineering; Computer science; Architectural engineering; Political science; Artificial intelligence","score_opus":0.007251295349360982,"score_gpt":0.18699859553542028,"score_spread":0.1797473001860593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1939123876","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014509237,0.0015576861,0.038630113,0.005141124,0.00083133695,0.0003562265,0.013577871,0.01658754,0.9088088],"genre_scores_gemma":[0.09917666,0.0019482266,0.04146838,0.00086623535,0.00016767996,0.00024422433,0.02711853,0.0071605365,0.8218495],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973175,0.00015707774,0.000067901216,0.0002632444,0.0017913532,0.00040293668],"domain_scores_gemma":[0.99722433,0.00013786322,0.00009238186,0.00038908998,0.0013851947,0.00077125494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001823473,0.0015875765,0.00037489904,0.0034610399,0.0025489284,0.0041276184,0.0017001082,0.0014696677,0.12684849],"category_scores_gemma":[0.0027379522,0.00070364546,0.00037970714,0.005016238,0.0011336332,0.0026008736,0.0042133066,0.001139548,0.0470511],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015349267,0.00014319213,0.0024402572,0.0003686012,0.000024227587,0.0005389336,0.00069061003,0.0017742349,0.013778748,0.038639743,0.6663793,0.2750686],"study_design_scores_gemma":[0.0000062048507,0.000012188033,0.0018503685,0.000030544405,0.00000335185,0.00020987609,0.00025012981,0.0011377758,0.0015644449,0.0010766648,0.99384016,0.00001836453],"about_ca_topic_score_codex":0.28631055,"about_ca_topic_score_gemma":0.2806873,"teacher_disagreement_score":0.28631055,"about_ca_system_score_codex":0.0053146295,"about_ca_system_score_gemma":0.022538932,"threshold_uncertainty_score":0.5692881},"labels":[],"label_agreement":null},{"id":"W1943878062","doi":"","title":"Bridging the gap between building science and design studios","year":2002,"lang":"en","type":"article","venue":"University of North Texas Digital Library (University of North Texas)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Public Works and Government Services Canada; Government of Canada; Australian Government; California Energy Commission; U.S. Department of Energy","keywords":"Bridging (networking); Studio; Computer science; Bridge (graph theory); Process (computing); Engineering design process; Design tool; Software engineering; Architectural engineering; Systems engineering; Engineering; Mechanical engineering; Programming language","score_opus":0.01757098433944888,"score_gpt":0.16336137015746016,"score_spread":0.1457903858180113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1943878062","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035442628,0.012882231,0.7086144,0.018704167,0.00083896285,0.0001980624,0.00018364654,0.004105334,0.21903054],"genre_scores_gemma":[0.2441819,0.013044278,0.67410415,0.003122704,0.0007677712,0.00058284256,0.00052140944,0.0033781969,0.06029679],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98425645,0.0076796603,0.0011113125,0.0011425551,0.005297111,0.00051294494],"domain_scores_gemma":[0.9630983,0.023288703,0.0010871956,0.0049559358,0.004528943,0.0030410672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020099977,0.0007239377,0.0012941924,0.0036020437,0.0015290435,0.011889747,0.0024896741,0.0016672703,0.016591465],"category_scores_gemma":[0.025932262,0.0014290247,0.0005894442,0.0032866814,0.00462029,0.006432228,0.006496814,0.0048830323,0.0055119735],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014124875,0.00028616644,0.0013129403,0.0007135345,0.00002563955,0.00013331194,0.0063600484,0.0051850546,0.0027178992,0.4337916,0.018575592,0.530757],"study_design_scores_gemma":[0.00007368077,0.0001861378,0.0020006567,0.0006498604,0.000019021396,0.00054551184,0.0025860476,0.010541463,0.0020053722,0.1289003,0.8524312,0.00006068461],"about_ca_topic_score_codex":0.0015206394,"about_ca_topic_score_gemma":0.0024435273,"teacher_disagreement_score":0.020099977,"about_ca_system_score_codex":0.0041794153,"about_ca_system_score_gemma":0.00723907,"threshold_uncertainty_score":0.106300116},"labels":[],"label_agreement":null},{"id":"W1957508919","doi":"10.1139/cjce-2014-0078","title":"A conceptual approach to track design changes within a multi-disciplinary building information modeling environment","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada); University of British Columbia","funders":"","keywords":"Track (disk drive); Computer science; Discipline; Civil engineering; Architectural engineering; Engineering","score_opus":0.04122999055739158,"score_gpt":0.19911290062468484,"score_spread":0.15788291006729327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1957508919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016580487,0.00013030175,0.9920317,0.00072854233,0.000042118012,0.00014601123,0.00009808115,0.00037182844,0.0047934516],"genre_scores_gemma":[0.027512187,0.00020812303,0.9704381,0.000104974104,0.00001643945,0.0002934899,0.00024271489,0.000084595405,0.0010992816],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9930428,0.0025242378,0.0007110729,0.001129686,0.002193117,0.00039907757],"domain_scores_gemma":[0.99119675,0.0025590165,0.0010849005,0.002440374,0.0020335794,0.0006854526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010448911,0.0014440399,0.00081737066,0.008029761,0.0031867158,0.009916511,0.007149755,0.0036404496,0.0037237355],"category_scores_gemma":[0.011821495,0.0020358544,0.0033935679,0.00870481,0.007116908,0.015451644,0.006807038,0.0050958763,0.0010768526],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023257835,0.00009424194,0.0014846092,0.00026528537,0.00005538497,0.00033189336,0.003734867,0.036927313,0.0020036309,0.91317886,0.002272532,0.03962809],"study_design_scores_gemma":[0.000044505887,0.00015530437,0.0014462112,0.00074399647,0.00019975813,0.0009128858,0.0034788284,0.3002634,0.00461728,0.40430358,0.28362307,0.00021115049],"about_ca_topic_score_codex":0.018365894,"about_ca_topic_score_gemma":0.02342014,"teacher_disagreement_score":0.018365894,"about_ca_system_score_codex":0.0061644563,"about_ca_system_score_gemma":0.008992527,"threshold_uncertainty_score":0.055259824},"labels":[],"label_agreement":null},{"id":"W1961945644","doi":"","title":"WSP GLOBAL – Acoustique, bruit et vibrations","year":2015,"lang":"fr","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.019133556305447136,"score_gpt":0.24201670971297193,"score_spread":0.2228831534075248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1961945644","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023277711,0.0006874551,0.8947942,0.00059054606,0.00031434125,0.00017528543,0.001089532,0.006603671,0.07246735],"genre_scores_gemma":[0.29112837,0.0022181405,0.5406359,0.0003321039,0.00018750168,0.0005560158,0.0045232857,0.0050499695,0.15536873],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978569,0.00017719706,0.000115770184,0.00038486675,0.001313309,0.00015204358],"domain_scores_gemma":[0.998629,0.00029141837,0.000090263515,0.0003469907,0.00050617097,0.00013626563],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017552911,0.0018931581,0.0007503057,0.0022831452,0.0011409281,0.0038734935,0.00119473,0.0014088966,0.03129888],"category_scores_gemma":[0.003130614,0.0008177399,0.0008439602,0.0022096152,0.001450896,0.0034261167,0.0040761866,0.0014394418,0.009396619],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002561308,0.00011734879,0.0033475037,0.000903845,0.00008006042,0.00040330322,0.0017883328,0.033881474,0.103870064,0.038692277,0.019633431,0.79702616],"study_design_scores_gemma":[0.00005928825,0.00037500783,0.014958593,0.00035888742,0.00010926951,0.0009953459,0.002486807,0.11986691,0.13697645,0.028780876,0.6948271,0.00020550692],"about_ca_topic_score_codex":0.010095398,"about_ca_topic_score_gemma":0.012677065,"teacher_disagreement_score":0.03129888,"about_ca_system_score_codex":0.0010789857,"about_ca_system_score_gemma":0.0028751737,"threshold_uncertainty_score":0.104705155},"labels":[],"label_agreement":null},{"id":"W1963500213","doi":"10.5555/1030453.1030704","title":"CEPM 1: special purpose simulation modeling of tower cranes","year":2002,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"","keywords":"Tower; Tower crane; Computer science; Resource (disambiguation); Set (abstract data type); Simulation modeling; Lift (data mining); Industrial engineering; Duration (music); Simulation; Engineering; Operations research; Systems engineering; Civil engineering; Data mining","score_opus":0.04232238322040434,"score_gpt":0.24000650120023181,"score_spread":0.1976841179798275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963500213","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051544677,0.00013011838,0.8933863,0.00019468847,0.000086662985,0.00033161492,0.0020035494,0.005434466,0.046887975],"genre_scores_gemma":[0.6588915,0.00058789895,0.30990914,0.0001047547,0.00004361257,0.00092239934,0.0038358865,0.0008514117,0.024853382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967504,0.000075318785,0.000018790697,0.000043101314,0.00014350782,0.000044266737],"domain_scores_gemma":[0.99963534,0.00010875158,0.00003729775,0.0000761012,0.00011337877,0.000029123406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043499548,0.00061917293,0.00055089325,0.000516059,0.0004722135,0.001172794,0.0016494886,0.0010637079,0.0075279614],"category_scores_gemma":[0.0010086078,0.000502625,0.0008687592,0.00069590233,0.0003967518,0.00081876526,0.0006207003,0.00082041346,0.0012516106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005099918,0.000036119647,0.00095958746,0.00006492621,0.000014304132,0.00010274548,0.00006158003,0.97011775,0.0025526162,0.011064762,0.0024609438,0.0125136245],"study_design_scores_gemma":[0.00000971519,0.000016658534,0.0001899027,0.000006861444,0.0000054548123,0.000023643139,0.0000072812895,0.9906046,0.0013200912,0.0010494101,0.0067604845,0.0000058975806],"about_ca_topic_score_codex":0.014479459,"about_ca_topic_score_gemma":0.009009268,"teacher_disagreement_score":0.014479459,"about_ca_system_score_codex":0.00079481705,"about_ca_system_score_gemma":0.0015967208,"threshold_uncertainty_score":0.028790355},"labels":[],"label_agreement":null},{"id":"W1963926375","doi":"10.1139/l06-124","title":"Modeling and coordinating building systems in three dimensions: a case study","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Context (archaeology); Systems engineering; Constructability; Computer science; Identification (biology); Domain (mathematical analysis); Process modeling; Software engineering; Engineering; Work in process","score_opus":0.008525242788431744,"score_gpt":0.18717234129992627,"score_spread":0.17864709851149452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1963926375","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7692339,0.00018758535,0.20941015,0.0009875617,0.000020775164,0.00053978566,0.0002755959,0.0003172528,0.019027356],"genre_scores_gemma":[0.85710067,0.00017440118,0.14016503,0.000047150847,0.000005710852,0.0002366914,0.00018098191,0.000045858036,0.002043491],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9956637,0.0028445853,0.00021160209,0.00031663614,0.00066225784,0.0003011789],"domain_scores_gemma":[0.9925598,0.005141828,0.00044720806,0.0011617457,0.0003941243,0.00029531753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004425803,0.0006583109,0.0004650202,0.0011170746,0.0027915584,0.0026168956,0.0023318157,0.0034266897,0.002264738],"category_scores_gemma":[0.00631534,0.0005982618,0.0010900929,0.001853841,0.0029503116,0.003039924,0.0028532178,0.0015348903,0.00028901314],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005893585,0.0023193334,0.0283034,0.00072135346,0.00012675393,0.016769433,0.052926835,0.6129398,0.011623567,0.16490655,0.0035247477,0.10524888],"study_design_scores_gemma":[0.00045430614,0.001417203,0.010701518,0.0004001377,0.00019322176,0.004773807,0.05582369,0.7592625,0.03171139,0.035721067,0.09932076,0.00022028183],"about_ca_topic_score_codex":0.02244277,"about_ca_topic_score_gemma":0.03592185,"teacher_disagreement_score":0.02244277,"about_ca_system_score_codex":0.0038293481,"about_ca_system_score_gemma":0.002952624,"threshold_uncertainty_score":0.04462427},"labels":[],"label_agreement":null},{"id":"W1964796479","doi":"10.1016/j.autcon.2008.03.002","title":"IT usage in Alberta's building construction projects: Current status and challenges","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Lagging; Unavailability; Construction industry; Stakeholder; Information technology; Construction management; Engineering; Information and Communications Technology; Business; Engineering management; Knowledge management; Construction engineering; Public relations; Computer science; Civil engineering","score_opus":0.024102060240323738,"score_gpt":0.240846735745405,"score_spread":0.21674467550508125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1964796479","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94124883,0.010888707,0.0020134784,0.007052915,0.00007442709,0.000029793855,0.000686011,0.000090401496,0.03791548],"genre_scores_gemma":[0.98239076,0.010209563,0.0018718095,0.00043778864,0.000037721762,0.000020041673,0.00055236,0.000028621986,0.004451364],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99327374,0.0014633192,0.0003201352,0.00043586866,0.0033354736,0.0011715153],"domain_scores_gemma":[0.988528,0.003261722,0.001430016,0.00034556637,0.005110409,0.0013242195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038848473,0.00033508072,0.00044005705,0.003715891,0.002231787,0.0060114716,0.0020331203,0.0011627426,0.0026809678],"category_scores_gemma":[0.0069222427,0.00030849068,0.0003973805,0.010336266,0.0023424302,0.0024753744,0.0020512755,0.0009454325,0.0003799575],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023269972,0.0003080681,0.50253683,0.00064220437,0.00007173534,0.000491508,0.017801618,0.0020167967,0.0014930431,0.0066184243,0.006696232,0.46109083],"study_design_scores_gemma":[0.000014103267,0.00018071473,0.79913193,0.0014071482,0.000112604546,0.0006369736,0.09245109,0.0049912836,0.001511753,0.002716491,0.096738294,0.00010768394],"about_ca_topic_score_codex":0.75693655,"about_ca_topic_score_gemma":0.8365416,"teacher_disagreement_score":0.24306345,"about_ca_system_score_codex":0.010867238,"about_ca_system_score_gemma":0.021803835,"threshold_uncertainty_score":0.48898977},"labels":[],"label_agreement":null},{"id":"W1965637137","doi":"10.1016/j.aogh.2015.02.692","title":"Facility mapping: A tool for effective planning for MNCH services","year":2015,"lang":"en","type":"article","venue":"Annals of Global Health","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Process management; Business","score_opus":0.05604932489277715,"score_gpt":0.36107854561188846,"score_spread":0.3050292207191113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1965637137","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016762342,0.0008549458,0.7325332,0.017399095,0.001265685,0.0085796835,0.02950585,0.05222642,0.14087276],"genre_scores_gemma":[0.05516969,0.00062613713,0.9233544,0.00040766102,0.000098045064,0.0028874364,0.0052373502,0.0015880696,0.010631205],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9921101,0.0040804273,0.0009264275,0.00056571997,0.0018279053,0.0004893891],"domain_scores_gemma":[0.97248435,0.013012793,0.0019932797,0.0036512038,0.0068445588,0.0020137767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014836303,0.001925411,0.0013354154,0.012397181,0.0035044993,0.008544323,0.004036187,0.0018778774,0.10762885],"category_scores_gemma":[0.05829773,0.0013489871,0.0014242803,0.009666025,0.0010954285,0.008660575,0.008009175,0.002398962,0.021995943],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002124092,0.00051003863,0.010019048,0.0010732644,0.000107653505,0.00031391447,0.0040651434,0.012321025,0.00071134366,0.023107775,0.2861403,0.66141814],"study_design_scores_gemma":[0.0003977904,0.0004434931,0.015044415,0.0035034132,0.00022348031,0.00053410756,0.032385245,0.100525685,0.0037721512,0.08824659,0.7544257,0.000497937],"about_ca_topic_score_codex":0.026337862,"about_ca_topic_score_gemma":0.04515852,"teacher_disagreement_score":0.10762885,"about_ca_system_score_codex":0.0049136104,"about_ca_system_score_gemma":0.017936014,"threshold_uncertainty_score":0.36005437},"labels":[],"label_agreement":null},{"id":"W1967131639","doi":"10.1139/l08-023","title":"Soft computing approach to construction performance prediction and diagnosis","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"BP (Canada); Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Soft computing; Computer science; Task (project management); Field (mathematics); Fuzzy logic; Artificial neural network; Construction management; Fuzzy set; Set (abstract data type); Data mining; Machine learning; Measure (data warehouse); Artificial intelligence; Industrial engineering; Engineering; Systems engineering","score_opus":0.007179525981164324,"score_gpt":0.15119331130776298,"score_spread":0.14401378532659864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967131639","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01536785,0.0003873037,0.9795217,0.0003192038,0.000032307595,0.00006118767,0.000055987053,0.00022815404,0.004026457],"genre_scores_gemma":[0.59410596,0.0010554396,0.40079013,0.00012217378,0.00009899427,0.0002723832,0.00014447191,0.000032031883,0.00337841],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991497,0.00033123765,0.00006045417,0.00010542861,0.00030251307,0.0000505634],"domain_scores_gemma":[0.998212,0.0012770786,0.00014190872,0.00009390326,0.0002294019,0.000045665394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010055245,0.00076770596,0.00071858556,0.0016990313,0.0004839335,0.0018457052,0.00088576437,0.00094427087,0.0019555348],"category_scores_gemma":[0.003508388,0.0002993705,0.000494923,0.001326609,0.0011561535,0.0011884968,0.00086667563,0.0010703239,0.00030440628],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007966082,0.00015764662,0.0028925901,0.00019363368,0.000104215644,0.00015506096,0.00020884007,0.7682887,0.0028991876,0.0543519,0.0012036602,0.16946493],"study_design_scores_gemma":[0.0000065422096,0.00003578068,0.0003306662,0.000019806113,0.000011823634,0.00002531888,0.000050679522,0.97346795,0.0011578542,0.023753827,0.0011269395,0.000012836222],"about_ca_topic_score_codex":0.0045786477,"about_ca_topic_score_gemma":0.0039092773,"teacher_disagreement_score":0.0045786477,"about_ca_system_score_codex":0.0010243411,"about_ca_system_score_gemma":0.0013231452,"threshold_uncertainty_score":0.009104013},"labels":[],"label_agreement":null},{"id":"W1967242003","doi":"10.1002/smr.420","title":"Introduction to the special issue on reverse engineering (WCRE 2008)","year":2009,"lang":"en","type":"article","venue":"Journal of Software Maintenance and Evolution Research and Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Computer science","score_opus":0.014672507453901643,"score_gpt":0.2791645647178339,"score_spread":0.26449205726393227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967242003","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00044280212,0.031092193,0.0106361685,0.05206595,0.8482693,0.00023969432,0.0011248885,0.0017363622,0.054392703],"genre_scores_gemma":[0.0035027987,0.032302983,0.0072959773,0.02500147,0.51007634,0.00032537337,0.0040551457,0.0033245373,0.41411537],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99470735,0.0008347753,0.00054846914,0.00090366363,0.0025618484,0.00044389535],"domain_scores_gemma":[0.9806034,0.0045817546,0.0012105767,0.001705288,0.00941375,0.0024852622],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046871942,0.0021657126,0.0020820184,0.0042962455,0.0020395098,0.009574521,0.0021958859,0.005519169,0.16779491],"category_scores_gemma":[0.017253406,0.00085861864,0.0018941468,0.0028708635,0.001215076,0.008258696,0.0039592246,0.0070240106,0.119427994],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014374891,0.000012886086,0.00003732868,0.00013262835,0.000004951422,0.000027683709,0.000017694341,0.000049455204,0.00015861353,0.0009846247,0.9727621,0.025797622],"study_design_scores_gemma":[0.0000037547206,0.000014194459,0.00010231196,0.00013617918,0.0000041683984,0.00007836305,0.00002396205,0.000055123724,0.00007847134,0.0007984933,0.9986971,0.000007929536],"about_ca_topic_score_codex":0.001372225,"about_ca_topic_score_gemma":0.0024405771,"teacher_disagreement_score":0.16779491,"about_ca_system_score_codex":0.0020125255,"about_ca_system_score_gemma":0.0025417844,"threshold_uncertainty_score":0.5613299},"labels":[],"label_agreement":null},{"id":"W1967849422","doi":"10.1139/l01-032","title":"Integrating CAD and schedule for identification and resolution of work space conflicts between subcontractors","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Council","keywords":"Schedule; Computer science; Scheduling (production processes); Identification (biology); Space (punctuation); Critical path method; Conflict resolution; Operations research; CAD; Industrial engineering; Space exploration; Software; Systems engineering; Risk analysis (engineering); Engineering; Operations management; Engineering drawing","score_opus":0.010683989219165229,"score_gpt":0.1955786245529846,"score_spread":0.1848946353338194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1967849422","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07948513,0.00029302973,0.9033441,0.00024498452,0.000082114886,0.0004428585,0.00031550345,0.004353281,0.01143893],"genre_scores_gemma":[0.359615,0.00027755153,0.63527375,0.00003220847,0.000024818903,0.00026480417,0.00055159064,0.00016910832,0.0037911863],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988649,0.00037358198,0.0000882336,0.00008829842,0.0005195995,0.00006539511],"domain_scores_gemma":[0.99809617,0.00089859485,0.00019275238,0.00020406372,0.0005252706,0.00008307367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017505751,0.0008377359,0.00062399165,0.002869788,0.00063474616,0.0010335791,0.00062600354,0.00037852259,0.0048032613],"category_scores_gemma":[0.005634931,0.0004650625,0.00038163064,0.0013585318,0.00031741164,0.00085348793,0.0005742282,0.0003503808,0.00073732313],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003337493,0.00016958048,0.0050097383,0.00018204942,0.000036445283,0.00012821217,0.00048901775,0.071388714,0.011880649,0.013011037,0.006072954,0.8912979],"study_design_scores_gemma":[0.00018355396,0.00038154534,0.006690179,0.00008543365,0.00009904392,0.00032046498,0.0005209,0.9257514,0.021788921,0.007032083,0.037048142,0.00009828599],"about_ca_topic_score_codex":0.0086795995,"about_ca_topic_score_gemma":0.01332059,"teacher_disagreement_score":0.0086795995,"about_ca_system_score_codex":0.000778715,"about_ca_system_score_gemma":0.0018764229,"threshold_uncertainty_score":0.017258167},"labels":[],"label_agreement":null},{"id":"W1969294420","doi":"10.3141/2055-03","title":"Scheduling Work Zones for Highway Maintenance Projects","year":2008,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Mitel (Canada)","funders":"","keywords":"Scheduling (production processes); Transport engineering; Computer science; Operations research; Highway maintenance; Work (physics); Work zone; Engineering; Operations management","score_opus":0.08732751387725741,"score_gpt":0.33015799548406854,"score_spread":0.24283048160681114,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1969294420","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.33705094,0.0006215248,0.64518535,0.00015037115,0.00006387915,0.00062926445,0.0003957736,0.0007230444,0.015179733],"genre_scores_gemma":[0.85643595,0.00034916512,0.13964032,0.000010787122,0.000013252085,0.00030326893,0.00026475955,0.00008145914,0.0029010077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.999403,0.00025763348,0.00001962081,0.00006676914,0.00015760418,0.00009530804],"domain_scores_gemma":[0.99944836,0.00022880608,0.000118713666,0.00004185108,0.00007189904,0.0000904788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095989957,0.0006669117,0.0005499856,0.0011763059,0.0007949678,0.0011737865,0.00093629665,0.00048900174,0.005267352],"category_scores_gemma":[0.001958353,0.00046092257,0.0004451312,0.0011914349,0.00029514055,0.00061581103,0.0006867452,0.0004419136,0.0006463844],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002891965,0.00020945338,0.0019989682,0.00016116853,0.000027421873,0.00007600562,0.00020840752,0.86387926,0.0068199327,0.007233364,0.001321941,0.11777483],"study_design_scores_gemma":[0.00010198243,0.0005351489,0.004412091,0.000035648787,0.000048772414,0.00007758999,0.00045923464,0.9688757,0.0071495306,0.01059212,0.007670217,0.000041989475],"about_ca_topic_score_codex":0.0052141566,"about_ca_topic_score_gemma":0.007996678,"teacher_disagreement_score":0.005267352,"about_ca_system_score_codex":0.0010393254,"about_ca_system_score_gemma":0.0016181236,"threshold_uncertainty_score":0.01762104},"labels":[],"label_agreement":null},{"id":"W1970072403","doi":"10.4028/www.scientific.net/amr.1065-1069.1710","title":"Application of RFID Technology in Asphalt Pavement Construction","year":2014,"lang":"en","type":"article","venue":"Advanced materials research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ministry of Transportation of Ontario","funders":"","keywords":"Radio-frequency identification; Wireless; Productivity; Construction industry; Engineering; Construction engineering; Identification (biology); Asphalt; Manufacturing engineering; Transport engineering; Computer science; Telecommunications; Computer security","score_opus":0.012613686802639384,"score_gpt":0.2974581987252683,"score_spread":0.28484451192262894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1970072403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22678815,0.081747234,0.5363606,0.002718651,0.0011821812,0.00012557986,0.000085860614,0.0009291581,0.15006253],"genre_scores_gemma":[0.8574612,0.031929757,0.08383444,0.00026288952,0.0002588928,0.000023194709,0.000060352133,0.00003580113,0.02613351],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99922705,0.00021246514,0.000034119104,0.00008355225,0.00036627002,0.00007663165],"domain_scores_gemma":[0.99976116,0.00010592481,0.000028188422,0.000025143036,0.00006655348,0.000013001945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005317531,0.00028137446,0.00017678156,0.0011128251,0.00043724582,0.00071079633,0.000397258,0.0009460219,0.0018792644],"category_scores_gemma":[0.00065736636,0.0001939759,0.0003483116,0.001087564,0.0005931089,0.0009892668,0.0005774348,0.00032221095,0.00069704896],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002063163,0.00014174516,0.009917458,0.0009227818,0.00005029634,0.002774808,0.0010513649,0.021928001,0.15010716,0.039040033,0.0030453077,0.7708147],"study_design_scores_gemma":[0.000025102197,0.0012678755,0.024888428,0.0005445142,0.00016246125,0.013712062,0.0021894989,0.045791093,0.35495532,0.022058785,0.5341676,0.00023730352],"about_ca_topic_score_codex":0.00081086776,"about_ca_topic_score_gemma":0.0009926254,"teacher_disagreement_score":0.0018792644,"about_ca_system_score_codex":0.0004416605,"about_ca_system_score_gemma":0.00030668953,"threshold_uncertainty_score":0.0062868},"labels":[],"label_agreement":null},{"id":"W1971852361","doi":"10.1002/j.2168-9830.2002.tb00690.x","title":"A Seminar for Real‐time Interactive Simulation of Engineering Projects: An Innovative Use of Video‐conferencing and IT‐based Educational Tools","year":2002,"lang":"en","type":"article","venue":"Journal of Engineering Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières; Natural Sciences and Engineering Research Council of Canada; Polytechnique Montréal","funders":"","keywords":"Context (archaeology); Videoconferencing; Work (physics); Engineering management; Graduate students; Engineering education; Distance education; Teleconference; Engineering; Computer science; Multimedia; Pedagogy","score_opus":0.031607030841491,"score_gpt":0.2718655053756579,"score_spread":0.2402584745341669,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971852361","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69576037,0.0003394914,0.23564734,0.0016400927,0.00065335416,0.0014301767,0.00029101613,0.004409205,0.059828993],"genre_scores_gemma":[0.7679772,0.000224297,0.2111553,0.0003341318,0.00015511135,0.0009922788,0.00024872847,0.00027464834,0.018638438],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938786,0.00033966915,0.000024013225,0.00007664237,0.00010011591,0.00007167131],"domain_scores_gemma":[0.9982066,0.00096390315,0.000051858868,0.00020797206,0.00007683058,0.0004927386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019250893,0.0005903038,0.0003662385,0.00041390854,0.00067172677,0.001129819,0.0018849669,0.0011016148,0.011515757],"category_scores_gemma":[0.0025890258,0.000304294,0.00047177728,0.00018331133,0.0005436738,0.0007579615,0.0020309987,0.0008131349,0.0018564236],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0037596326,0.023239553,0.0060061687,0.0010980275,0.0001588193,0.006314673,0.02301955,0.027815513,0.19754569,0.018304823,0.065838784,0.6268987],"study_design_scores_gemma":[0.006298139,0.024178669,0.027437994,0.0010227555,0.00037479083,0.010739113,0.012840095,0.26273805,0.12284171,0.028330369,0.5023418,0.0008565085],"about_ca_topic_score_codex":0.00019611718,"about_ca_topic_score_gemma":0.00026199516,"teacher_disagreement_score":0.011515757,"about_ca_system_score_codex":0.00024260565,"about_ca_system_score_gemma":0.0004660453,"threshold_uncertainty_score":0.03852409},"labels":[],"label_agreement":null},{"id":"W1971857760","doi":"10.1260/1478-0771.9.2.187","title":"Aviva Stadium: A Case Study in Integrated Parametric Design","year":2011,"lang":"en","type":"article","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Stadium; Parametric statistics; Iterative design; Parametric design; Computer science; Process (computing); Conversation; Architectural engineering; Work (physics); Design process; Iterative and incremental development; Systems engineering; Operations research; Industrial engineering; Engineering; Work in process; Software engineering; Operations management; Sociology; Mechanical engineering; Mathematics","score_opus":0.040527974409425266,"score_gpt":0.26393502847159245,"score_spread":0.22340705406216718,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1971857760","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91345996,0.00054838334,0.030770848,0.001858523,0.00011775702,0.00028633836,0.00041825566,0.0002580499,0.052281886],"genre_scores_gemma":[0.954441,0.0002976832,0.025469214,0.00014403314,0.000018839453,0.00014216977,0.00029697685,0.0001262826,0.019063693],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975897,0.001163787,0.00008612398,0.00017661638,0.00065191544,0.0003319114],"domain_scores_gemma":[0.9979017,0.0010205796,0.00009395557,0.00028219042,0.00028826867,0.0004133174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018658914,0.0007828298,0.0005765697,0.0010423631,0.0056318804,0.0029497717,0.0023171294,0.0044941604,0.004811597],"category_scores_gemma":[0.0036044351,0.0004379788,0.0006740402,0.0022078708,0.0024762847,0.0013096181,0.0026399987,0.0016811722,0.0011137717],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020551267,0.0048102974,0.05402753,0.0015288852,0.00022911449,0.15913129,0.15542123,0.14487968,0.03945054,0.13367625,0.040889326,0.2639008],"study_design_scores_gemma":[0.00040095524,0.0038936539,0.050038002,0.0006923678,0.00022520634,0.039090462,0.122847006,0.13839063,0.030834137,0.01860991,0.59458286,0.0003948128],"about_ca_topic_score_codex":0.024587017,"about_ca_topic_score_gemma":0.072868206,"teacher_disagreement_score":0.024587017,"about_ca_system_score_codex":0.004030883,"about_ca_system_score_gemma":0.0025083523,"threshold_uncertainty_score":0.04888779},"labels":[],"label_agreement":null},{"id":"W1975392223","doi":"10.1061/(asce)co.1943-7862.0000364","title":"Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visibility; Supply network; Dependency (UML); Work (physics); Computer science; Tracking (education); Supply chain; Field (mathematics); Risk analysis (engineering); Systems engineering; Business; Engineering; Artificial intelligence; Marketing","score_opus":0.006045387046516512,"score_gpt":0.18553003637183574,"score_spread":0.1794846493253192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1975392223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80514467,0.00011556085,0.17653313,0.00023540309,0.000011795178,0.00013573999,0.000051106595,0.00027819225,0.01749441],"genre_scores_gemma":[0.9627018,0.000078819954,0.036688007,0.0000047905,0.0000018320927,0.000025734487,0.000023447432,0.000010532132,0.00046503622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99833566,0.00089390716,0.00005741406,0.00011832981,0.00045218438,0.00014247608],"domain_scores_gemma":[0.9968245,0.0018123438,0.0005758274,0.00035736721,0.00036323004,0.000066656474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016524736,0.00038760505,0.00026338996,0.00096684555,0.0004867015,0.0020679878,0.0008871775,0.00048447395,0.001946506],"category_scores_gemma":[0.0058882376,0.00034498176,0.00039194015,0.0013472859,0.0006487726,0.0029615501,0.0017338028,0.00036774605,0.0001715884],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043338572,0.0011090824,0.05918096,0.00035951028,0.000083380044,0.00035829467,0.003123794,0.69283426,0.026348148,0.026580859,0.000802091,0.18878616],"study_design_scores_gemma":[0.00013632994,0.0012816646,0.026067799,0.000106453284,0.00014838623,0.00023077236,0.0024336386,0.9276561,0.02211762,0.010739632,0.008976046,0.000105536245],"about_ca_topic_score_codex":0.0066625318,"about_ca_topic_score_gemma":0.013196102,"teacher_disagreement_score":0.0066625318,"about_ca_system_score_codex":0.0012272005,"about_ca_system_score_gemma":0.0022702278,"threshold_uncertainty_score":0.01324749},"labels":[],"label_agreement":null},{"id":"W1976484689","doi":"10.1139/l09-178","title":"An implementation model for automated construction materials tracking and locating","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Key (lock); Computer science; Automation; Emerging technologies; Productivity; Supply chain; Materials management; Oil refinery; Systems engineering; Engineering; Construction engineering; Manufacturing engineering; Operations management; Computer security; Business","score_opus":0.008080954407434839,"score_gpt":0.2245471597042594,"score_spread":0.21646620529682456,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1976484689","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010834664,0.0000362714,0.9806815,0.0003372684,0.000020377387,0.0003203446,0.00016485681,0.0010168998,0.006587912],"genre_scores_gemma":[0.27775,0.00017762798,0.710465,0.00014417934,0.000021281752,0.0013985256,0.0005509248,0.0002576464,0.009234869],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979527,0.0006031466,0.00016396922,0.00031838656,0.0006632656,0.00029855935],"domain_scores_gemma":[0.99800247,0.0009578602,0.00017743024,0.00025503483,0.00051820604,0.000089006506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028697676,0.0008918717,0.000623909,0.0008566015,0.0007109816,0.0028293517,0.0028408978,0.0022454658,0.0077299583],"category_scores_gemma":[0.004760809,0.0007871137,0.0014552613,0.00072873937,0.0011026962,0.0033511627,0.0010519566,0.0017216039,0.0012943501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013141577,0.00017446492,0.0016434641,0.00013858949,0.000045044937,0.00030998417,0.0002665692,0.83079,0.0035731108,0.11893302,0.0020148486,0.041979417],"study_design_scores_gemma":[0.000031973468,0.00004619366,0.00013984855,0.000017717239,0.00002302831,0.00006479195,0.00003895877,0.98388356,0.0012153568,0.010417824,0.0041058585,0.00001483058],"about_ca_topic_score_codex":0.011438601,"about_ca_topic_score_gemma":0.009396308,"teacher_disagreement_score":0.011438601,"about_ca_system_score_codex":0.002204192,"about_ca_system_score_gemma":0.004189791,"threshold_uncertainty_score":0.025859237},"labels":[],"label_agreement":null},{"id":"W1977024736","doi":"10.1016/j.autcon.2015.03.004","title":"Automated generation of shop drawings in residential construction","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council","funders":"","keywords":"Visual Basic for Applications; CAD; Building information modeling; Computer Aided Design; Parametric statistics; Engineering drawing; Automation; Process (computing); Engineering; Parametric design; Technical drawing; Information model; Parametric model; Construction engineering; Manufacturing engineering; Computer science; Software engineering; Mechanical engineering; Operations management; Scheduling (production processes)","score_opus":0.020475940774067464,"score_gpt":0.24243523356336164,"score_spread":0.22195929278929416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977024736","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1978493,0.00032883967,0.76571107,0.00019843515,0.00008319326,0.00028724226,0.0013352497,0.019123144,0.015083568],"genre_scores_gemma":[0.6129561,0.00017554007,0.38001773,0.000024025045,0.00001131382,0.000089040856,0.0018132463,0.0008061839,0.004106861],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942505,0.00017930471,0.00001892054,0.00008082982,0.00024976104,0.000046175377],"domain_scores_gemma":[0.9992716,0.00028239758,0.00004714897,0.00016297799,0.00020391862,0.00003198679],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046564074,0.0006004906,0.00063759886,0.001096071,0.00049239397,0.0011337078,0.00088752416,0.0006731087,0.0071793287],"category_scores_gemma":[0.0017969803,0.0005789238,0.00055148744,0.0010640656,0.00032000465,0.00047869794,0.00081230083,0.0004640794,0.0019628026],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052008417,0.00021803519,0.0050645918,0.00031583756,0.00007521439,0.0008967701,0.0008185795,0.24068044,0.024224175,0.009063348,0.015153554,0.7029694],"study_design_scores_gemma":[0.000039750747,0.00007823778,0.003073723,0.000027006196,0.000028173685,0.0002944306,0.0002826477,0.9565731,0.022262145,0.004770347,0.012542549,0.00002779817],"about_ca_topic_score_codex":0.004632976,"about_ca_topic_score_gemma":0.008137172,"teacher_disagreement_score":0.0071793287,"about_ca_system_score_codex":0.0004138673,"about_ca_system_score_gemma":0.00093269243,"threshold_uncertainty_score":0.024017215},"labels":[],"label_agreement":null},{"id":"W1977137067","doi":"10.1061/(asce)co.1943-7862.0000705","title":"Hands-On Exercise for Enhancing Students’ Construction Management Skills","year":2013,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Schedule; Project management; Procurement; Computer science; Construction management; Interdependence; Engineering management; Project planning; Project management triangle; Knowledge management; Engineering; Systems engineering","score_opus":0.0026592082836023436,"score_gpt":0.18874731535874578,"score_spread":0.18608810707514345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977137067","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8957008,0.00048556124,0.04819031,0.0013755679,0.0004780249,0.001970408,0.00018457414,0.0021677795,0.049446944],"genre_scores_gemma":[0.7631044,0.0009927293,0.1891943,0.00084382715,0.00028093377,0.0019743713,0.0004114835,0.00022681993,0.042971216],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99910647,0.00020245576,0.000047553523,0.00015409898,0.00022603673,0.0002633854],"domain_scores_gemma":[0.998705,0.0004056587,0.00008418428,0.00015054128,0.00014954408,0.00050508813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001087534,0.001753807,0.0008981653,0.0010449219,0.000776563,0.001225972,0.0014155458,0.0014839161,0.02142823],"category_scores_gemma":[0.0025847615,0.00034857815,0.00062470004,0.0003603644,0.0005364323,0.0011984863,0.002815732,0.0015925302,0.0054652067],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013169445,0.08942504,0.0066269436,0.0015050739,0.000060275448,0.0014596276,0.0073105795,0.0022878747,0.09628129,0.0024347634,0.020407377,0.7708842],"study_design_scores_gemma":[0.0046451096,0.083173305,0.16426153,0.002658391,0.00063761417,0.011767386,0.018209223,0.02660838,0.23668817,0.025255471,0.4253639,0.000731568],"about_ca_topic_score_codex":0.00017129644,"about_ca_topic_score_gemma":0.0005000443,"teacher_disagreement_score":0.02142823,"about_ca_system_score_codex":0.00025290114,"about_ca_system_score_gemma":0.000580615,"threshold_uncertainty_score":0.07168454},"labels":[],"label_agreement":null},{"id":"W1977950491","doi":"10.1061/(asce)co.1943-7862.0000220","title":"Role of Simulation in Construction Engineering and Management","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":356,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Software deployment; Key (lock); Computer science; Construction management; Systems engineering; Construction industry; Management science; Engineering management; Construction engineering; Engineering; Software engineering; Civil engineering; Computer security","score_opus":0.002317563432346137,"score_gpt":0.17324124150140063,"score_spread":0.1709236780690545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1977950491","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01932659,0.07343151,0.5494333,0.051213995,0.0021542374,0.00016449946,0.00018017678,0.00068808696,0.3034076],"genre_scores_gemma":[0.73460466,0.080937386,0.15675907,0.003066582,0.0019463727,0.00035887994,0.00024305831,0.00025954086,0.021824436],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99408543,0.004272273,0.00021203814,0.0003763733,0.0008741791,0.00017964236],"domain_scores_gemma":[0.9924892,0.005699442,0.00029828542,0.0006102719,0.0005223263,0.00038050365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052412525,0.00074812025,0.00093488203,0.0017034555,0.0016568541,0.007766622,0.0013189826,0.0026484518,0.00456223],"category_scores_gemma":[0.008905742,0.00038977194,0.0005491831,0.0017863249,0.008775595,0.005871517,0.0037061982,0.0034017186,0.0007838446],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001618865,0.000024658957,0.0005523492,0.00013996895,0.000020247877,0.000049376762,0.00055676914,0.023483505,0.00020280994,0.9346272,0.0029109963,0.03741605],"study_design_scores_gemma":[0.000012974082,0.00006446013,0.00038907403,0.00056905154,0.00001658148,0.00010487176,0.000641724,0.047269132,0.0005207657,0.76888525,0.18148361,0.000042525247],"about_ca_topic_score_codex":0.003739047,"about_ca_topic_score_gemma":0.0023044883,"teacher_disagreement_score":0.007766622,"about_ca_system_score_codex":0.0030480016,"about_ca_system_score_gemma":0.004396655,"threshold_uncertainty_score":0.027718782},"labels":[],"label_agreement":null},{"id":"W1978216279","doi":"10.1061/9780784413586.084","title":"Key Components for the Effective Management of Airport Assets","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Asset management; Best practice; Business; Process (computing); Key (lock); Asset (computer security); Engineering management; Process management; International airport; Computer science; Engineering; Transport engineering; Finance; Computer security; Management; Economics","score_opus":0.0068172728147281895,"score_gpt":0.20465657036246085,"score_spread":0.19783929754773266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978216279","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06707522,0.005099613,0.36685967,0.016558938,0.0004940666,0.0033650466,0.0011304521,0.0030980285,0.53631896],"genre_scores_gemma":[0.41110587,0.004918035,0.51661533,0.00091549975,0.00012069709,0.0011515917,0.0013989604,0.00037801423,0.06339598],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9948644,0.0011201865,0.00050574617,0.0003007925,0.0025351902,0.0006737667],"domain_scores_gemma":[0.9953868,0.00088025496,0.00062670367,0.000543775,0.0018573202,0.00070504396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004026802,0.0009621172,0.00040810226,0.0033408264,0.0032454606,0.009720307,0.0014869891,0.0019108597,0.019373218],"category_scores_gemma":[0.00888736,0.0008552192,0.00043132075,0.003950749,0.0024105809,0.0059266123,0.0048639653,0.0019127232,0.009675757],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039639704,0.00024504028,0.0074419347,0.0012800022,0.000040012066,0.00059950456,0.007166551,0.005591585,0.009971652,0.20467032,0.040865082,0.7220887],"study_design_scores_gemma":[0.000019186236,0.0002193344,0.044866223,0.0026258263,0.00007862427,0.0012673301,0.015898889,0.004577036,0.0069573927,0.100285254,0.8230613,0.0001436015],"about_ca_topic_score_codex":0.009040899,"about_ca_topic_score_gemma":0.012182788,"teacher_disagreement_score":0.019373218,"about_ca_system_score_codex":0.003183741,"about_ca_system_score_gemma":0.010363114,"threshold_uncertainty_score":0.06480986},"labels":[],"label_agreement":null},{"id":"W1978709380","doi":"10.1061/(asce)co.1943-7862.0000959","title":"Setting Baseline Rates for On-Site Work Categories in the Construction Industry","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Baseline (sea); Flexibility (engineering); Work (physics); Computer science; Installation; Inference; Construction industry; Industrial engineering; Operations research; Engineering; Construction engineering; Artificial intelligence; Statistics; Mathematics","score_opus":0.00493514479746501,"score_gpt":0.2023066663861754,"score_spread":0.19737152158871038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978709380","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66492796,0.000294965,0.32191467,0.00013088842,0.000066807035,0.00045823262,0.002099437,0.0007485163,0.009358515],"genre_scores_gemma":[0.8905729,0.00011813428,0.10582571,0.000020220206,0.000007885866,0.0005404972,0.0018768462,0.000065713946,0.00097214227],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9959031,0.001311567,0.0003692649,0.0008445966,0.0013178901,0.00025357693],"domain_scores_gemma":[0.99054176,0.0034298636,0.0013588842,0.0015156701,0.0029093167,0.00024450247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049592415,0.00062917575,0.0005194259,0.0015458172,0.0005338073,0.0011021402,0.0011248864,0.00083406793,0.0012091157],"category_scores_gemma":[0.016837697,0.00031718446,0.00040242175,0.0015298831,0.00041942336,0.0015201966,0.00086707954,0.0007220405,0.00076770195],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014676646,0.0016119318,0.29133573,0.000808427,0.00009727615,0.00025247483,0.0030205052,0.13738708,0.030907806,0.00833914,0.005347368,0.51942456],"study_design_scores_gemma":[0.000096232034,0.0024035857,0.47307646,0.000539956,0.0000741811,0.00047134416,0.004856129,0.43335977,0.054070704,0.012211274,0.018581672,0.0002586549],"about_ca_topic_score_codex":0.0059919087,"about_ca_topic_score_gemma":0.008787607,"teacher_disagreement_score":0.0059919087,"about_ca_system_score_codex":0.0010966209,"about_ca_system_score_gemma":0.0009974536,"threshold_uncertainty_score":0.026227295},"labels":[],"label_agreement":null},{"id":"W1978951516","doi":"10.2749/222137908796294153","title":"Offsite/Accelerated Construction of a Busy Interchange Bridge","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Schedule; Transport engineering; Modular design; Engineering; Quarter (Canadian coin); Civil engineering; Computer science; Geography","score_opus":0.03619922417992151,"score_gpt":0.21605945711087582,"score_spread":0.17986023293095432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1978951516","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3644425,0.00023632601,0.20093948,0.00059997855,0.00049420807,0.0006455001,0.00034688844,0.0018279239,0.4304671],"genre_scores_gemma":[0.6836054,0.00020833527,0.1777428,0.00019112178,0.00006707214,0.000166584,0.0008524241,0.00037646043,0.1367899],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99921405,0.00009098969,0.000020646507,0.00006286284,0.00048542023,0.0001260815],"domain_scores_gemma":[0.99964833,0.00001260843,0.000023895376,0.000098688215,0.00013286957,0.00008353153],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006578671,0.00053279195,0.0002543918,0.00095743896,0.00096693897,0.0009304982,0.0009930752,0.00056416256,0.020095455],"category_scores_gemma":[0.0006170425,0.000331865,0.0004317749,0.00040556333,0.00045207987,0.000764304,0.0017172341,0.00072002586,0.0033844698],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051393086,0.00079029915,0.009424382,0.00018877779,0.000031468935,0.0022861422,0.00094047,0.017808868,0.16983867,0.031108959,0.044845864,0.7222222],"study_design_scores_gemma":[0.0003321935,0.0034691335,0.047211684,0.00019403062,0.00009901734,0.00611301,0.0017452901,0.072093815,0.09118199,0.006675066,0.7707268,0.00015800715],"about_ca_topic_score_codex":0.0058977017,"about_ca_topic_score_gemma":0.02300024,"teacher_disagreement_score":0.020095455,"about_ca_system_score_codex":0.0008020855,"about_ca_system_score_gemma":0.0022399344,"threshold_uncertainty_score":0.06722605},"labels":[],"label_agreement":null},{"id":"W1979530329","doi":"10.1139/l11-005","title":"Lean construction implementation and its implication on sustainability: a contractor’s case study","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Lean construction; Lean project management; Sustainability; Lean manufacturing; Construction industry; Lean laboratory; Construction management; Scheduling (production processes); Process management; Work (physics); Lean software development; Manufacturing engineering; Engineering; Operations management; Computer science; Construction engineering; Civil engineering","score_opus":0.012551596372692648,"score_gpt":0.22360704831333603,"score_spread":0.21105545194064337,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979530329","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97390294,0.00010352025,0.008689382,0.0012405849,0.000017478675,0.0002521449,0.00010263376,0.0000527375,0.015638549],"genre_scores_gemma":[0.9783303,0.0002489563,0.013010565,0.00016843168,0.00000986791,0.00012869206,0.000080222984,0.000038495666,0.00798449],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9947306,0.0029220807,0.00017356183,0.00023539958,0.0010919357,0.0008463913],"domain_scores_gemma":[0.99488246,0.0020623514,0.00045957282,0.00045555067,0.0010576815,0.0010823808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062888856,0.00043993435,0.00034407244,0.00096546515,0.0060037067,0.0023111724,0.0015411878,0.0022925963,0.0035379804],"category_scores_gemma":[0.0051518674,0.00037340316,0.0005000319,0.0018711007,0.0025116678,0.0014342928,0.001861116,0.0013755077,0.00056526624],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002967109,0.024179025,0.17324963,0.0009930677,0.0002472025,0.074700564,0.15580228,0.07811977,0.025711637,0.09424488,0.022745047,0.3470398],"study_design_scores_gemma":[0.0008666793,0.013013054,0.084248595,0.00087288383,0.00019971337,0.024524687,0.31635353,0.17475256,0.04838197,0.015599417,0.32051748,0.0006693737],"about_ca_topic_score_codex":0.03432315,"about_ca_topic_score_gemma":0.051138088,"teacher_disagreement_score":0.03432315,"about_ca_system_score_codex":0.0044420934,"about_ca_system_score_gemma":0.0063733947,"threshold_uncertainty_score":0.06824672},"labels":[],"label_agreement":null},{"id":"W1979573995","doi":"10.1108/14714171011060088","title":"Analysis of labour productivity of formwork operations in building construction","year":2010,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Crew; Originality; Formwork; Work (physics); Procurement; Engineering; Civil engineering; Business; Economics; Mechanical engineering; Qualitative research; Marketing; Economic growth","score_opus":0.007299542001483548,"score_gpt":0.23010995295389394,"score_spread":0.2228104109524104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1979573995","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9980867,0.000039076087,0.0010007329,0.000013979965,0.0000020338587,0.000011958486,0.0002059392,0.000007125914,0.00063246296],"genre_scores_gemma":[0.9989052,0.000027940421,0.00038882694,0.000001972674,0.0000017829037,0.000008677027,0.00021823522,0.0000016105811,0.00044569327],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99939585,0.0001634338,0.000033004566,0.00008142155,0.00023641791,0.00008989385],"domain_scores_gemma":[0.99780923,0.00095592963,0.0005412289,0.0001078897,0.00039293614,0.00019281758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093753566,0.00028772783,0.0001897563,0.00097240816,0.00028847466,0.0006049766,0.0003340174,0.00019244647,0.0020978465],"category_scores_gemma":[0.0041530775,0.00013396703,0.00029209824,0.00101138,0.00026397195,0.0003399583,0.0004135609,0.00021599204,0.0002526941],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003383412,0.00023304136,0.9421957,0.00009882791,0.0000935459,0.00017056533,0.000813077,0.011308849,0.0034156002,0.00013526685,0.00023632821,0.040960904],"study_design_scores_gemma":[0.0000018777804,0.0001453521,0.99080807,0.000007820922,0.000013028215,0.00003323998,0.000558695,0.0075857183,0.0005918659,0.000066269204,0.00018146206,0.0000067191922],"about_ca_topic_score_codex":0.029605089,"about_ca_topic_score_gemma":0.056436326,"teacher_disagreement_score":0.029605089,"about_ca_system_score_codex":0.0013245322,"about_ca_system_score_gemma":0.00079837913,"threshold_uncertainty_score":0.058865547},"labels":[],"label_agreement":null},{"id":"W1981172092","doi":"10.1061/(asce)cp.1943-5487.0000123","title":"Near Real-Time Motion Planning and Simulation of Cranes in Construction: Framework and System Architecture","year":2012,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":87,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Planner; Motion planning; Motion (physics); Engineering; Automation; Architecture; Systems engineering; Computer science; Simulation; Artificial intelligence; Robot","score_opus":0.005447623349515008,"score_gpt":0.209963585215207,"score_spread":0.204515961865692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981172092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010487633,0.00013252116,0.9846393,0.00011902822,0.000014064645,0.00009914186,0.00009917448,0.002110521,0.0022986128],"genre_scores_gemma":[0.38847595,0.00065996905,0.60768574,0.000049385413,0.000021736534,0.0004961576,0.00047244443,0.00017532893,0.001963299],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997117,0.000078031255,0.000020707756,0.00006111697,0.00009531302,0.000033093616],"domain_scores_gemma":[0.999803,0.000067862566,0.000022095992,0.000029777899,0.000049079074,0.000028277647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005920291,0.00055497186,0.0006161859,0.0006178269,0.0005505219,0.0013831405,0.001717876,0.00091494754,0.0024654756],"category_scores_gemma":[0.00088013517,0.00043517048,0.0006985785,0.0005568808,0.00096939114,0.001012341,0.0012013573,0.000775782,0.0004654712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000068173475,0.00005576077,0.0010228446,0.000112502974,0.000031222244,0.00011156404,0.0001949517,0.93850183,0.004541952,0.026048187,0.0008002439,0.028510729],"study_design_scores_gemma":[0.000010749462,0.000022780212,0.00012189899,0.00001119584,0.000008456045,0.000027883443,0.000023580342,0.99318826,0.0010274381,0.0031892338,0.0023591176,0.000009432986],"about_ca_topic_score_codex":0.017995177,"about_ca_topic_score_gemma":0.014137059,"teacher_disagreement_score":0.017995177,"about_ca_system_score_codex":0.0009748525,"about_ca_system_score_gemma":0.0018498,"threshold_uncertainty_score":0.035780847},"labels":[],"label_agreement":null},{"id":"W1981921521","doi":"10.1061/40754(183)131","title":"Situation Based Modeling for Construction Productivity","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"Industry Canada","keywords":"Productivity; Construction industry; Computer science; Construction management; Risk analysis (engineering); Engineering; Construction engineering; Business; Civil engineering; Economics","score_opus":0.014046059575211212,"score_gpt":0.21066634935449757,"score_spread":0.19662028977928636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1981921521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02004534,0.0005450581,0.9444668,0.00088317395,0.00012442553,0.0001780076,0.00076981646,0.0007180913,0.03226935],"genre_scores_gemma":[0.6714473,0.0015449692,0.31403518,0.00014455756,0.000101547186,0.0009720016,0.0010166633,0.00016538128,0.010572417],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99897885,0.0005147436,0.00006195362,0.00012764112,0.0002245765,0.00009225686],"domain_scores_gemma":[0.9976076,0.0017510902,0.00016577289,0.000117110714,0.00027775424,0.00008055114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017122942,0.0011773563,0.00066519907,0.0016257942,0.00086265715,0.0023953437,0.0017868715,0.0014205234,0.0097250305],"category_scores_gemma":[0.005749655,0.00059258204,0.0017207584,0.0018405345,0.00092722283,0.0022455289,0.0013426617,0.0014868617,0.0010933169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002235577,0.000049502374,0.0007488706,0.00005963307,0.000040062412,0.00008257193,0.00020499622,0.861737,0.00016505845,0.12604365,0.0011728811,0.009673484],"study_design_scores_gemma":[0.000008931511,0.00001352723,0.00014037397,0.000019990559,0.000014985036,0.000027690216,0.00006659422,0.9610627,0.00007900887,0.035348773,0.0032050987,0.000012235423],"about_ca_topic_score_codex":0.017104635,"about_ca_topic_score_gemma":0.010724508,"teacher_disagreement_score":0.017104635,"about_ca_system_score_codex":0.0027450402,"about_ca_system_score_gemma":0.002039674,"threshold_uncertainty_score":0.034010112},"labels":[],"label_agreement":null},{"id":"W1982161115","doi":"10.1061/(asce)0733-9364(2000)126:2(137)","title":"Project Performance Control in Reconstruction Projects","year":2000,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":105,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Schedule; Control (management); Quality (philosophy); Earned value management; Process management; Performance indicator; Engineering; Project planning; Construction engineering; Engineering management; Computer science; Project management; Transport engineering; Operations management; Systems engineering; Business; Project charter; Artificial intelligence; Marketing","score_opus":0.004215611017472729,"score_gpt":0.17087970827404322,"score_spread":0.1666640972565705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1982161115","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96578383,0.0005335917,0.025302906,0.00018442635,0.000017411123,0.0002710421,0.000061883235,0.0001800854,0.007664823],"genre_scores_gemma":[0.99327636,0.00013350244,0.0055713495,0.000009980099,0.000008947314,0.00011510036,0.000061857,0.00001845169,0.0008043247],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9730819,0.0148314005,0.0016863358,0.0018274041,0.007600849,0.0009722],"domain_scores_gemma":[0.9413124,0.028878141,0.0123566305,0.0045999964,0.011165074,0.0016878094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019748414,0.00054392905,0.00037240775,0.0026914096,0.00097314315,0.002304907,0.0009331044,0.000300246,0.00088542013],"category_scores_gemma":[0.051409684,0.00031657872,0.00019521234,0.0024887684,0.0012460557,0.0012180331,0.0014927527,0.0004834344,0.00019553874],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012294677,0.0008936698,0.2335302,0.0005931493,0.00012214639,0.00019469223,0.017017122,0.0126830535,0.011422959,0.0028978272,0.0015623006,0.71785355],"study_design_scores_gemma":[0.00016394752,0.005139755,0.90456903,0.00037425317,0.00012814456,0.0006514741,0.016244706,0.028677301,0.022129742,0.00196794,0.01974098,0.00021263381],"about_ca_topic_score_codex":0.0050892276,"about_ca_topic_score_gemma":0.0036876353,"teacher_disagreement_score":0.019748414,"about_ca_system_score_codex":0.002308558,"about_ca_system_score_gemma":0.0023902662,"threshold_uncertainty_score":0.10444087},"labels":[],"label_agreement":null},{"id":"W1984686034","doi":"10.1007/bf02483137","title":"Optimization of ternary cementitious mortar blends using factorial experimental plans","year":2002,"lang":"en","type":"article","venue":"Materials and Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Mortar; Cementitious; Materials science; Factorial experiment; Ternary operation; Solid mechanics; Composite material; Cement; Mathematics; Computer science; Statistics","score_opus":0.013262008324287136,"score_gpt":0.21045959812394788,"score_spread":0.19719758979966073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1984686034","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9876302,0.0003211297,0.009413348,0.000020190051,0.000014700375,0.00011515596,0.00021008785,0.00010024417,0.0021748613],"genre_scores_gemma":[0.9903978,0.00019291881,0.008627665,0.0000071547856,0.0000030392123,0.00011540887,0.00010045647,0.000032553373,0.000522926],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994406,0.00007961519,0.00005896895,0.000104574574,0.00022502018,0.00009117278],"domain_scores_gemma":[0.9994624,0.00020758536,0.00013244576,0.000058757258,0.00010144621,0.000037373826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094178197,0.00068090175,0.001062614,0.0007192721,0.00049385015,0.00087738596,0.0006016295,0.00044774284,0.0022090573],"category_scores_gemma":[0.0014296134,0.00038016948,0.0004730156,0.0011043698,0.00035473553,0.0006843008,0.00037252775,0.00044139344,0.00028430374],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003197704,0.0021578947,0.001932354,0.000541573,0.00006259308,0.000091165886,0.000086140615,0.09483958,0.86699915,0.0020766216,0.00018666073,0.027828498],"study_design_scores_gemma":[0.00020545082,0.0022856689,0.0020239595,0.000012708155,0.00011643095,0.000025818219,0.000050601615,0.047389057,0.9464192,0.00021765384,0.0012201004,0.00003338454],"about_ca_topic_score_codex":0.0010782229,"about_ca_topic_score_gemma":0.0022247466,"teacher_disagreement_score":0.0022090573,"about_ca_system_score_codex":0.00097344455,"about_ca_system_score_gemma":0.00062359095,"threshold_uncertainty_score":0.007390082},"labels":[],"label_agreement":null},{"id":"W1985282346","doi":"10.5555/1030818.1031026","title":"Construction engineering and project management II: an application of lean concepts and simulation for drainage operations maintenance crews","year":2003,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Drainage; Engineering; Crew; Productivity; Maintenance engineering; Work (physics); Lean construction; Construction engineering; Reliability engineering; Construction industry","score_opus":0.01680683118234449,"score_gpt":0.2695450519253714,"score_spread":0.25273822074302693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1985282346","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6334949,0.00018994216,0.33748627,0.00077358575,0.00006426013,0.0007180693,0.00023193832,0.00083751447,0.026203489],"genre_scores_gemma":[0.8176938,0.00022000152,0.17901182,0.000059926242,0.000012577154,0.0005016625,0.00015321276,0.00007680935,0.0022702052],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99935085,0.0004234143,0.000024582687,0.0000378292,0.000112665926,0.0000506396],"domain_scores_gemma":[0.9980046,0.0015728441,0.000073753756,0.00010612522,0.00014981219,0.00009289161],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017298787,0.00066444004,0.0003862224,0.0006099944,0.00067301927,0.001499116,0.0007373355,0.001019462,0.0016621216],"category_scores_gemma":[0.0031932509,0.00039880743,0.0004174031,0.0008202153,0.00057499495,0.0006774576,0.0010128687,0.00071312056,0.00013341021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028691004,0.00066330686,0.00652374,0.000082204155,0.000047295915,0.0002231121,0.0015876116,0.9182371,0.0026408504,0.014310693,0.00085447426,0.054542705],"study_design_scores_gemma":[0.00006523709,0.00015051747,0.0008901678,0.000018607878,0.0000111517165,0.00002339283,0.00035977125,0.9923185,0.0011129797,0.0031807877,0.0018567911,0.000012122541],"about_ca_topic_score_codex":0.012868956,"about_ca_topic_score_gemma":0.011629803,"teacher_disagreement_score":0.012868956,"about_ca_system_score_codex":0.0012425919,"about_ca_system_score_gemma":0.0017268164,"threshold_uncertainty_score":0.025588095},"labels":[],"label_agreement":null},{"id":"W1986507000","doi":"10.1139/l10-007","title":"A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":119,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Korea Institute of Construction Technology","keywords":"Duration (music); Case-based reasoning; Genetic algorithm; Process (computing); Project management; Project planning; Computer science; Artificial neural network; Operations research; Engineering; Machine learning; Systems engineering","score_opus":0.016598489944070382,"score_gpt":0.20555184988719563,"score_spread":0.18895335994312526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986507000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5324341,0.0005237374,0.4567132,0.00070529623,0.000088425455,0.00031852844,0.000633946,0.0010994253,0.007483399],"genre_scores_gemma":[0.9385098,0.00018739456,0.059271995,0.000064062835,0.000014800318,0.00019495486,0.00027919392,0.000021081805,0.0014566944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918705,0.0003494796,0.00006269244,0.0001331174,0.00018091816,0.00008672248],"domain_scores_gemma":[0.99820733,0.0012331239,0.0001438068,0.000076988625,0.0002804503,0.000058259342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017833768,0.0006906735,0.0008288817,0.0016459158,0.0004408203,0.0015612979,0.0017185222,0.0013984451,0.0016300024],"category_scores_gemma":[0.0047665644,0.000469584,0.0007869026,0.0014654386,0.0003745779,0.0013687687,0.00055982615,0.0006466715,0.00030240547],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001821844,0.00019808112,0.004559341,0.000054942855,0.00006861985,0.00020392908,0.00009772771,0.96065724,0.0008942762,0.0016465184,0.0004130261,0.03102407],"study_design_scores_gemma":[0.000014491978,0.000030444397,0.0005357052,0.0000058009086,0.000017795272,0.000027143944,0.000018513687,0.99860966,0.00015857228,0.0004756924,0.00009848438,0.000007677446],"about_ca_topic_score_codex":0.026891405,"about_ca_topic_score_gemma":0.013829621,"teacher_disagreement_score":0.026891405,"about_ca_system_score_codex":0.0017030509,"about_ca_system_score_gemma":0.0011209645,"threshold_uncertainty_score":0.053469777},"labels":[],"label_agreement":null},{"id":"W1986519255","doi":"10.1108/02632770010315733","title":"Accommodating future business intelligence: new work‐space and work‐time challenges for management and design","year":2000,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Agile software development; Facility management; Work (physics); Space (punctuation); Knowledge management; Process management; Engineering management; Business intelligence; Duration (music); Quality (philosophy); Computer science; Engineering; Business; Marketing","score_opus":0.023454132478267456,"score_gpt":0.20261664009764066,"score_spread":0.1791625076193732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986519255","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036441617,0.018937208,0.5507301,0.14793958,0.0018116812,0.00010522285,0.000096647644,0.0006629266,0.243275],"genre_scores_gemma":[0.68152183,0.019475006,0.2531229,0.009429374,0.0021074307,0.0005136848,0.00019531837,0.00042702243,0.033207506],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9946755,0.002359635,0.00023164792,0.0004384563,0.0016466602,0.00064803724],"domain_scores_gemma":[0.9955472,0.0018258024,0.00036185482,0.0007429929,0.00056552334,0.0009566274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008638913,0.0006722263,0.0008285594,0.0016733492,0.0055773146,0.022193344,0.0025713474,0.0047042714,0.004412182],"category_scores_gemma":[0.0055757463,0.0008256166,0.0006144353,0.0019741566,0.014078359,0.029454071,0.010661399,0.0051233526,0.0016116067],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002220483,0.000044853492,0.0005435843,0.00017427167,0.000016803995,0.00013624372,0.005937325,0.002510504,0.00041959557,0.89075685,0.011281061,0.088156775],"study_design_scores_gemma":[0.000009388151,0.000033096625,0.0003535762,0.00017548284,0.000008469621,0.0002142046,0.007917975,0.0042086514,0.00026250456,0.718294,0.2684835,0.000039100923],"about_ca_topic_score_codex":0.0016922074,"about_ca_topic_score_gemma":0.0024919382,"teacher_disagreement_score":0.022193344,"about_ca_system_score_codex":0.003473246,"about_ca_system_score_gemma":0.0048779584,"threshold_uncertainty_score":0.045687497},"labels":[],"label_agreement":null},{"id":"W1986999660","doi":"10.1139/l06-073","title":"A hybrid approach for developing special purpose simulation tools","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Simulation modeling; Key (lock); Systems engineering; Automation; Modeling and simulation; Industrial engineering; Construction management; Simulation; Software engineering; Engineering; Civil engineering","score_opus":0.012056505322784941,"score_gpt":0.1832137220702825,"score_spread":0.17115721674749756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1986999660","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032092428,0.000043525033,0.99213,0.00003430907,0.000015213715,0.00006455561,0.000020667498,0.0011075552,0.0033749433],"genre_scores_gemma":[0.049980193,0.00013283228,0.94561946,0.00003449949,0.000009650027,0.0002692519,0.00017503151,0.00020282666,0.0035762817],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99857783,0.0003461208,0.00010697636,0.00014482046,0.00075186376,0.000072318886],"domain_scores_gemma":[0.9986633,0.00041210258,0.00006650983,0.0004648187,0.00031944146,0.00007381517],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010989504,0.0005949439,0.00044358303,0.0011637505,0.00046326703,0.0014226753,0.0018866739,0.00070513645,0.0045607006],"category_scores_gemma":[0.0019119341,0.0006416613,0.0010149451,0.0008423168,0.0006720511,0.0013615594,0.0017778407,0.001085738,0.0012704005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022348344,0.00025653112,0.0021807745,0.0006711367,0.00021830811,0.0004631497,0.0013043936,0.18126349,0.07534079,0.24481598,0.0065304614,0.4867315],"study_design_scores_gemma":[0.000067184556,0.00023316269,0.0006025966,0.0000973451,0.00008326471,0.000605113,0.0001818405,0.79931927,0.029504634,0.034572568,0.13466221,0.00007078597],"about_ca_topic_score_codex":0.001125868,"about_ca_topic_score_gemma":0.002114369,"teacher_disagreement_score":0.0045607006,"about_ca_system_score_codex":0.00056821696,"about_ca_system_score_gemma":0.0010468549,"threshold_uncertainty_score":0.01525712},"labels":[],"label_agreement":null},{"id":"W1988285173","doi":"10.1111/1467-8667.00274","title":"Information Population of an Integrated Construction Management System","year":2002,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of New Brunswick","funders":"","keywords":"Computer science; Information system; Management information systems; Construction management; Systems engineering; Information management; Knowledge management; Engineering","score_opus":0.002722841995804883,"score_gpt":0.14785803208072462,"score_spread":0.14513519008491974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1988285173","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7846976,0.00026514736,0.15186924,0.00074953155,0.000047434936,0.00067203277,0.004045259,0.0053243525,0.05232938],"genre_scores_gemma":[0.9471306,0.00015025886,0.03584924,0.00013526528,0.00004212034,0.00029030017,0.004419541,0.00017369565,0.011809057],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985819,0.00029424045,0.00012893703,0.00026858255,0.0005439936,0.00018234036],"domain_scores_gemma":[0.9977094,0.00080032286,0.00012827467,0.00034659734,0.0008211727,0.00019418442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015245577,0.00028962383,0.00068612106,0.0026721137,0.0010267474,0.0030317786,0.0009314238,0.00054515374,0.012716947],"category_scores_gemma":[0.0055609336,0.0003134939,0.0003195583,0.002980748,0.00040501566,0.0028854746,0.0013806499,0.00040416658,0.0021305294],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044272374,0.002283598,0.0918272,0.00036508066,0.00014070135,0.0013996641,0.004512383,0.101402014,0.049660165,0.09352887,0.023949694,0.6265034],"study_design_scores_gemma":[0.00032135347,0.001053595,0.03481494,0.00006295994,0.00025193798,0.0005318122,0.0016651362,0.8590976,0.038900603,0.0190999,0.044076372,0.00012382475],"about_ca_topic_score_codex":0.013315064,"about_ca_topic_score_gemma":0.004959992,"teacher_disagreement_score":0.013315064,"about_ca_system_score_codex":0.0014786843,"about_ca_system_score_gemma":0.0021066612,"threshold_uncertainty_score":0.042542458},"labels":[],"label_agreement":null},{"id":"W1989707769","doi":"10.1061/9780784413517.203","title":"Dimensions of Interoperability in the AEC Industry","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Interoperability; Construct (python library); Knowledge management; Cross-domain interoperability; Computer science; Dimension (graph theory); Semantic interoperability; Domain (mathematical analysis); Conceptual framework; Information system; Process (computing); Process management; Systems engineering; Engineering; Engineering management; World Wide Web","score_opus":0.03174179331005929,"score_gpt":0.30880099517769743,"score_spread":0.27705920186763816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1989707769","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16201098,0.064028285,0.27311197,0.067905135,0.00051767356,0.00050121965,0.000336284,0.00025225003,0.4313361],"genre_scores_gemma":[0.92044765,0.017746964,0.056377232,0.0019237167,0.00024264163,0.0004605008,0.00023410872,0.00005718852,0.0025100957],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9555823,0.025317583,0.0042361,0.002151,0.01091991,0.0017930525],"domain_scores_gemma":[0.96151745,0.028950796,0.0027184333,0.0025002097,0.003549034,0.0007639738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021513728,0.0006080742,0.0008918539,0.01326476,0.004231258,0.021582115,0.0017790748,0.0043957867,0.0028233563],"category_scores_gemma":[0.031223495,0.00064597366,0.0009426789,0.015453726,0.024822876,0.026913272,0.012371118,0.0045290957,0.00029520245],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009891256,0.000031112984,0.0022547322,0.0003585698,0.000027764429,0.00015513929,0.009762972,0.00084076246,0.00022980377,0.94991904,0.0007095398,0.035700686],"study_design_scores_gemma":[0.000009949439,0.000045463992,0.0055426825,0.0017612448,0.000047343605,0.0006331056,0.044360153,0.0019476659,0.000461805,0.85283464,0.092293285,0.0000627278],"about_ca_topic_score_codex":0.0032941895,"about_ca_topic_score_gemma":0.0017076074,"teacher_disagreement_score":0.021582115,"about_ca_system_score_codex":0.00781955,"about_ca_system_score_gemma":0.008739533,"threshold_uncertainty_score":0.11377686},"labels":[],"label_agreement":null},{"id":"W1990630350","doi":"10.2118/2006-019","title":"Alternative Real-Time and Historical Visualization of Cementing Operations Data","year":2006,"lang":"en","type":"article","venue":"Canadian International Petroleum Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Visualization; Data visualization; Real-time computing; Computer graphics (images); Data mining","score_opus":0.02272969835358207,"score_gpt":0.23658632602127014,"score_spread":0.21385662766768807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1990630350","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6850577,0.002763299,0.20458676,0.0022606438,0.00093723816,0.00028569583,0.03216935,0.020896638,0.05104269],"genre_scores_gemma":[0.8898169,0.00079884497,0.09766022,0.00010755186,0.000114725095,0.000085406515,0.0071098497,0.0004330576,0.0038733666],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995542,0.00008767224,0.00003516999,0.000086087675,0.00017597614,0.000060868115],"domain_scores_gemma":[0.9984464,0.00044098005,0.00018644288,0.00016500699,0.00060590485,0.00015528227],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007479934,0.0005753705,0.0002617128,0.006548093,0.00030380642,0.0022194013,0.0004355008,0.00068695133,0.008610177],"category_scores_gemma":[0.002020523,0.00019994198,0.00029808262,0.0039634393,0.00023974126,0.001235642,0.00087654527,0.0006840915,0.0012060824],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029585527,0.00075502717,0.09092602,0.0015368522,0.00030865686,0.0023338997,0.0063784304,0.078369066,0.088315986,0.019927375,0.051581033,0.6566091],"study_design_scores_gemma":[0.00019141292,0.00056422706,0.1694662,0.0006669906,0.00019067359,0.0016630728,0.006691923,0.63881433,0.039970487,0.011132531,0.13024336,0.00040475422],"about_ca_topic_score_codex":0.0058532506,"about_ca_topic_score_gemma":0.008012824,"teacher_disagreement_score":0.008610177,"about_ca_system_score_codex":0.00049759255,"about_ca_system_score_gemma":0.00040298223,"threshold_uncertainty_score":0.028803945},"labels":[],"label_agreement":null},{"id":"W1991371878","doi":"10.5555/1030453.1030703","title":"CEPM 1: optimal construction project planning","year":2002,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Component (thermodynamics); Work (physics); Computer science; Pre-construction services; Production (economics); Industry 4.0; Systems engineering; Process management; Project planning; Engineering management; Project management; Construction engineering; Risk analysis (engineering); Engineering; Business","score_opus":0.04683132176019348,"score_gpt":0.2603667320102238,"score_spread":0.21353541025003034,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991371878","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013956745,0.00020115843,0.965725,0.00038337955,0.000053665193,0.00025516187,0.0006554802,0.0011105333,0.01765893],"genre_scores_gemma":[0.3222104,0.00037992725,0.6658791,0.000108188826,0.000043826945,0.0005919217,0.001363138,0.0002929666,0.009130467],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936754,0.000171578,0.000030314557,0.00011732594,0.00018679525,0.00012649728],"domain_scores_gemma":[0.9995758,0.00015348848,0.00003922361,0.000048092756,0.00012882065,0.00005466629],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001151365,0.0007787751,0.0011922596,0.00095437246,0.0007207017,0.0018849263,0.0016393836,0.0013753604,0.008949569],"category_scores_gemma":[0.002424139,0.00083086727,0.0006590114,0.0011713058,0.00072014425,0.0011664246,0.0017292793,0.00095693185,0.0013077409],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011298467,0.00003773416,0.000514219,0.00008706376,0.000013743063,0.00010243201,0.00005243608,0.9159829,0.00076640554,0.021539288,0.0063697943,0.05442099],"study_design_scores_gemma":[0.000018363397,0.000027353264,0.00017742802,0.000011618887,0.0000060315483,0.000030801242,0.000032856395,0.9846638,0.00060841435,0.01065242,0.003761767,0.000009174463],"about_ca_topic_score_codex":0.01677748,"about_ca_topic_score_gemma":0.019980647,"teacher_disagreement_score":0.01677748,"about_ca_system_score_codex":0.0014120768,"about_ca_system_score_gemma":0.0045546414,"threshold_uncertainty_score":0.033359647},"labels":[],"label_agreement":null},{"id":"W1991412404","doi":"10.1061/41109(373)26","title":"A Simulation Driven Visualization Framework for Construction Operations: Development and Application","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Visualization; Computer science; Component (thermodynamics); High-level architecture; Construction industry; Systems engineering; Data visualization; Architecture; Software engineering; Construction engineering; Engineering; Interoperability; Data mining; Operating system","score_opus":0.007830445393437012,"score_gpt":0.2597025157271291,"score_spread":0.2518720703336921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1991412404","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012107675,0.000076679455,0.98904467,0.00013371055,0.000030112416,0.0001044953,0.00017668081,0.0069551244,0.0022676284],"genre_scores_gemma":[0.038969137,0.00060226064,0.95429367,0.00006803371,0.000034317723,0.00048118492,0.0012006072,0.001772756,0.0025780143],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934083,0.0001891203,0.00006378249,0.00007035157,0.00028469108,0.000051209685],"domain_scores_gemma":[0.9991565,0.00030099743,0.00005335001,0.00012645958,0.00026713396,0.000095519084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019680415,0.0011506353,0.00074216264,0.0014302037,0.00064086093,0.0021531896,0.0023771406,0.0012973542,0.0066076573],"category_scores_gemma":[0.002454954,0.0008470809,0.0011628312,0.0011235378,0.0008083339,0.0017729806,0.0018403174,0.001976329,0.0018318526],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017446882,0.00037666043,0.0024377985,0.00070408,0.00015767636,0.0008070809,0.0018323103,0.36247382,0.027008861,0.24050406,0.034041073,0.3294821],"study_design_scores_gemma":[0.00005684645,0.00007564337,0.0005491683,0.00020842269,0.000038396614,0.00039756796,0.00014608171,0.79059476,0.011856454,0.032440417,0.16352661,0.000109654684],"about_ca_topic_score_codex":0.0058662198,"about_ca_topic_score_gemma":0.0051539377,"teacher_disagreement_score":0.0066076573,"about_ca_system_score_codex":0.0008817658,"about_ca_system_score_gemma":0.0019693775,"threshold_uncertainty_score":0.0221048},"labels":[],"label_agreement":null},{"id":"W1992421768","doi":"10.1139/l02-043","title":"Contractor integrated technical information service in construction","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction management; Building information modeling; Process (computing); Service (business); Key (lock); Integrated project delivery; Engineering management; Construction industry; Pre-construction services; Process management; Information sharing; Computer science; Engineering; Project management; Construction engineering; Systems engineering; Operations management; Project planning; Computer security; Business; World Wide Web","score_opus":0.00526877139542775,"score_gpt":0.15514180988648843,"score_spread":0.14987303849106068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1992421768","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04850728,0.0021313084,0.31481916,0.014978991,0.0007865911,0.0027275675,0.001482002,0.004151793,0.61041534],"genre_scores_gemma":[0.56145746,0.0026708026,0.23370229,0.0035875335,0.00038417306,0.004580948,0.0032724324,0.0008945014,0.18944974],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9679437,0.011078716,0.0026991563,0.0014969951,0.01501842,0.0017629798],"domain_scores_gemma":[0.9769677,0.007468019,0.0018310823,0.0059041358,0.00649937,0.001329719],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02420293,0.00037796836,0.00037462363,0.0024181919,0.003461296,0.006635752,0.002016909,0.00377423,0.015303033],"category_scores_gemma":[0.02634065,0.00042603118,0.0003306583,0.006227053,0.0036580958,0.0067357384,0.0050060595,0.002394338,0.00485152],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000169127,0.00021059641,0.0040446967,0.00018770943,0.000012107676,0.00016735027,0.0026966766,0.003108609,0.0019926615,0.72139126,0.06905959,0.19695964],"study_design_scores_gemma":[0.00009310838,0.0002779024,0.0036747654,0.00030557375,0.000024174453,0.00037639873,0.0014971308,0.0120100165,0.005954136,0.030716859,0.9449819,0.000088008506],"about_ca_topic_score_codex":0.049365386,"about_ca_topic_score_gemma":0.02611638,"teacher_disagreement_score":0.049365386,"about_ca_system_score_codex":0.008581724,"about_ca_system_score_gemma":0.03306353,"threshold_uncertainty_score":0.12799883},"labels":[],"label_agreement":null},{"id":"W1993372756","doi":"10.1139/l08-005","title":"Production prediction of conventional and global positioning system–based earthmoving systems using simulation and multiple regression analysis","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Inha University","keywords":"Global Positioning System; Production (economics); Productivity; Process (computing); Industrial engineering; Regression analysis; Engineering; Estimation; Data collection; Cost estimate; Selection (genetic algorithm); Computer science; Operations research; Systems engineering; Machine learning","score_opus":0.0110056174314461,"score_gpt":0.1883001692069025,"score_spread":0.17729455177545642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993372756","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.927417,0.00006197407,0.070065424,0.000045454195,0.000010514938,0.000053926276,0.00019762771,0.00026545973,0.0018826233],"genre_scores_gemma":[0.98597276,0.000043381573,0.013430068,0.0000028539937,0.0000011929369,0.000028691713,0.00010598855,0.000015148553,0.00039995613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950385,0.00015879709,0.000033105483,0.0000891031,0.00015547474,0.000059590155],"domain_scores_gemma":[0.99815553,0.0011803174,0.0001950015,0.00010502711,0.00033281365,0.000031324293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011752364,0.00068138994,0.00043614226,0.0007745115,0.00027193752,0.0006212489,0.00050197146,0.00053399894,0.000896343],"category_scores_gemma":[0.0024069909,0.0003677173,0.0005386735,0.0008713669,0.00029863388,0.00070724013,0.00026855402,0.00038604572,0.00019202198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010722409,0.000068374786,0.00794039,0.000024222605,0.00001965072,0.000049569633,0.000031040894,0.9792837,0.0020304313,0.00035234558,0.00007815969,0.010014854],"study_design_scores_gemma":[0.0000052161813,0.00004140895,0.0023316364,0.0000014357239,0.0000045324928,0.0000049725227,0.000009296276,0.9958496,0.0016102134,0.000065697444,0.00007150405,0.0000045491697],"about_ca_topic_score_codex":0.019589677,"about_ca_topic_score_gemma":0.015426442,"teacher_disagreement_score":0.019589677,"about_ca_system_score_codex":0.0012089296,"about_ca_system_score_gemma":0.00058064127,"threshold_uncertainty_score":0.038951278},"labels":[],"label_agreement":null},{"id":"W1993417500","doi":"10.1139/cjce-2014-0303","title":"The constructs of site layout modeling: an overview","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Site planning; Construct (python library); Systems engineering; Engineering; Engineering drawing","score_opus":0.02913142268579655,"score_gpt":0.20977067711530273,"score_spread":0.18063925442950618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993417500","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003937579,0.035977226,0.9019836,0.0031350413,0.0003297063,0.00021216867,0.00034310395,0.00056387513,0.053517777],"genre_scores_gemma":[0.12343441,0.11620411,0.7481938,0.00058042735,0.0005496424,0.00058641465,0.0008079101,0.00044757687,0.009195785],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9978416,0.00093286566,0.00014936806,0.00026220887,0.000688609,0.00012532958],"domain_scores_gemma":[0.9977616,0.0012304223,0.0002069313,0.0003149998,0.0003823173,0.00010372545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032003894,0.0016784519,0.00088457094,0.0046717497,0.0012794537,0.0066352678,0.0032915822,0.0021698477,0.0039731925],"category_scores_gemma":[0.0038299668,0.0015626492,0.0016517461,0.008303056,0.0048618587,0.0067730644,0.0021436887,0.00324402,0.0014985236],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020823869,0.000077782875,0.0015437567,0.001317743,0.000033540764,0.0002363605,0.001072495,0.050147884,0.0007466747,0.8193618,0.0049499087,0.120491296],"study_design_scores_gemma":[0.000011589455,0.00008907107,0.0020935938,0.0027873577,0.000064512074,0.0011616909,0.001414479,0.12172464,0.001604357,0.40856192,0.46036524,0.00012143148],"about_ca_topic_score_codex":0.010278353,"about_ca_topic_score_gemma":0.008300825,"teacher_disagreement_score":0.010278353,"about_ca_system_score_codex":0.0039290925,"about_ca_system_score_gemma":0.0046098544,"threshold_uncertainty_score":0.02850771},"labels":[],"label_agreement":null},{"id":"W1993588702","doi":"10.1016/s1389-1286(00)00198-5","title":"MSC and SDL in project life cycles","year":2001,"lang":"en","type":"article","venue":"Computer Networks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Computer science","score_opus":0.009946228646182725,"score_gpt":0.2016596295578581,"score_spread":0.19171340091167538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1993588702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27987024,0.005451174,0.5949334,0.0071233124,0.00017747591,0.00009790343,0.0007494046,0.00056246924,0.11103458],"genre_scores_gemma":[0.9586818,0.0007516003,0.027806573,0.00014076168,0.00010352681,0.00009483416,0.00020244451,0.00009355739,0.01212482],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99768186,0.0010623037,0.00014054037,0.00031009965,0.0005594923,0.00024568973],"domain_scores_gemma":[0.9830935,0.012611984,0.0013966932,0.00092465215,0.0012633206,0.0007098518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033756658,0.00041994144,0.0008078449,0.0025147588,0.0008511348,0.002865383,0.00089380366,0.0010843958,0.009624057],"category_scores_gemma":[0.020376567,0.00049995806,0.0005212402,0.0029509512,0.002744487,0.005944309,0.0020006772,0.0012290358,0.00085700525],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000093385606,0.000045549117,0.002470921,0.00007101117,0.000014520075,0.000064927175,0.00036237514,0.055091996,0.0001547454,0.8645651,0.0022279609,0.074837506],"study_design_scores_gemma":[0.000013539873,0.00003073629,0.00047068135,0.00004138024,0.000009983714,0.000054575426,0.00018483626,0.1389963,0.00031260404,0.8522493,0.0076249335,0.000011055792],"about_ca_topic_score_codex":0.006305927,"about_ca_topic_score_gemma":0.0045046643,"teacher_disagreement_score":0.009624057,"about_ca_system_score_codex":0.0030321951,"about_ca_system_score_gemma":0.001789959,"threshold_uncertainty_score":0.032195687},"labels":[],"label_agreement":null},{"id":"W1994082041","doi":"10.5555/2431518.2431939","title":"Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Task (project management); Simulation modeling; Productivity; Real-time computing; Data mining; Systems engineering; Engineering","score_opus":0.027703407505942607,"score_gpt":0.23624791773201415,"score_spread":0.20854451022607154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994082041","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011726319,0.00013265634,0.9860093,0.000096798605,0.000014737821,0.000034714856,0.000036143134,0.00017311898,0.0017763497],"genre_scores_gemma":[0.43303975,0.0009089213,0.5635342,0.00005390619,0.000025295316,0.0002771024,0.00021940273,0.000093345894,0.0018481404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885046,0.0005902982,0.00006774886,0.000116669,0.00031737372,0.00005752233],"domain_scores_gemma":[0.9988427,0.00063859223,0.0001492481,0.00011559095,0.00019680131,0.00005709793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016822281,0.00064001285,0.0006955821,0.0006903211,0.00029117343,0.0014657638,0.001462449,0.0011262542,0.0011977684],"category_scores_gemma":[0.0038133343,0.00048392476,0.0010210065,0.0011812566,0.0008892179,0.0014969513,0.0010840007,0.0009265486,0.00031541256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003670452,0.000025136951,0.0006745698,0.000077971745,0.000019299436,0.00006257419,0.00018789874,0.96775883,0.0031309067,0.018051408,0.00016650191,0.009808168],"study_design_scores_gemma":[0.000010996224,0.000017311371,0.0001367218,0.000015598082,0.000009332107,0.000031772717,0.000042975622,0.9912804,0.0014644123,0.004685666,0.0022951346,0.000009750145],"about_ca_topic_score_codex":0.005309573,"about_ca_topic_score_gemma":0.0035319955,"teacher_disagreement_score":0.005309573,"about_ca_system_score_codex":0.0008304806,"about_ca_system_score_gemma":0.0015420911,"threshold_uncertainty_score":0.0105573535},"labels":[],"label_agreement":null},{"id":"W1994119669","doi":"10.1680/mpal.12.00009","title":"The chronographical approach for construction project modelling","year":2013,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Planner; Graphics; Schedule; Set (abstract data type); Scheduling (production processes); Statistical graphics; Representation (politics); Human–computer interaction; Artificial intelligence; Programming language; Engineering; Computer graphics (images)","score_opus":0.010420659588965583,"score_gpt":0.1831383901782016,"score_spread":0.172717730589236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1994119669","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007932652,0.00086831907,0.97212505,0.0003817295,0.00024350622,0.00017493726,0.00068765326,0.0006533017,0.024072211],"genre_scores_gemma":[0.045167275,0.0032519987,0.92891204,0.0002661041,0.000215166,0.0010434579,0.0020917885,0.00046586705,0.018586216],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975891,0.0011920342,0.00027721561,0.0003346152,0.00049957086,0.00010747212],"domain_scores_gemma":[0.9981475,0.00077866745,0.00018065824,0.00032574442,0.0004894109,0.00007812597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023360793,0.0012888109,0.00059840205,0.003629068,0.0010541776,0.0046406277,0.0021876863,0.0011875712,0.018662628],"category_scores_gemma":[0.00648996,0.000530163,0.0018940333,0.0057011507,0.0019497604,0.0039358037,0.0017832308,0.0018724308,0.0058580553],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004305163,0.000020188327,0.0004208891,0.00033748124,0.000022647791,0.00025532136,0.00092960097,0.025727505,0.0008556048,0.8933542,0.011044904,0.06698867],"study_design_scores_gemma":[0.000023773311,0.000045086294,0.00032954031,0.00041018586,0.000033525615,0.000508384,0.0006620421,0.06331788,0.0009763422,0.27930564,0.6543198,0.000067674795],"about_ca_topic_score_codex":0.010870212,"about_ca_topic_score_gemma":0.012486653,"teacher_disagreement_score":0.018662628,"about_ca_system_score_codex":0.0022415451,"about_ca_system_score_gemma":0.0026943947,"threshold_uncertainty_score":0.062432706},"labels":[],"label_agreement":null},{"id":"W1996097716","doi":"10.1061/41109(373)28","title":"An Optimization Model for Dynamic Multi-Project Environment in Construction","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Profitability index; Computer science; Mathematical optimization; Profit (economics); Discrete event simulation; Industrial engineering; Operations research; Engineering; Simulation; Mathematics","score_opus":0.009346053719204333,"score_gpt":0.22523193853102902,"score_spread":0.2158858848118247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1996097716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070242574,0.0002572723,0.9823073,0.0004012949,0.000034068275,0.000046947593,0.00017364573,0.0001336325,0.009621595],"genre_scores_gemma":[0.68419397,0.0018170563,0.28737393,0.00022311893,0.00008729509,0.0010626051,0.00067726534,0.00023094736,0.024333887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918836,0.00033345586,0.000029219973,0.00014198145,0.00022277463,0.00008433159],"domain_scores_gemma":[0.999632,0.00020128209,0.000057160978,0.000020635869,0.000065472974,0.000023501701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010692521,0.00096559717,0.000952498,0.0006634093,0.00065090554,0.001786636,0.0016476216,0.0016268867,0.004542635],"category_scores_gemma":[0.0012267984,0.0006270891,0.000977362,0.0011222247,0.00091027934,0.0018861684,0.000952106,0.0014345127,0.0007284963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008886201,0.000011665116,0.000086501765,0.000028907174,0.0000074473132,0.000038621474,0.000017391769,0.9721253,0.00033179604,0.024299143,0.00039639766,0.0026479403],"study_design_scores_gemma":[0.000006908981,0.000017263928,0.000080093356,0.0000060691973,0.000005580744,0.000021181499,0.000013751659,0.98936266,0.00011703968,0.008703036,0.0016596006,0.0000069370135],"about_ca_topic_score_codex":0.006991334,"about_ca_topic_score_gemma":0.0059618233,"teacher_disagreement_score":0.006991334,"about_ca_system_score_codex":0.0018563176,"about_ca_system_score_gemma":0.002068728,"threshold_uncertainty_score":0.015196681},"labels":[],"label_agreement":null},{"id":"W1997159502","doi":"10.1016/j.autcon.2004.02.004","title":"A CAD-based model for site planning","year":2004,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"CAD; Interconnectivity; Computer Aided Design; Interface (matter); Engineering drawing; Object (grammar); Feature (linguistics); Set (abstract data type); Computer science; Engineering; Artificial intelligence; Programming language","score_opus":0.013572251697161742,"score_gpt":0.23587580195922345,"score_spread":0.2223035502620617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997159502","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0050877235,0.00024862122,0.9772735,0.0001750245,0.0000656586,0.00007271752,0.0013641677,0.0012557182,0.014456807],"genre_scores_gemma":[0.27413225,0.0012072364,0.6998644,0.00010868112,0.00003555687,0.00043906603,0.00398946,0.0004539491,0.019769426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972004,0.00003860992,0.000023360284,0.00004371036,0.00015354517,0.000020774749],"domain_scores_gemma":[0.9997937,0.000058593167,0.000015693726,0.000041238964,0.00007625158,0.000014522062],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002639936,0.00062639173,0.0006533356,0.0010426049,0.00048581988,0.0020917002,0.0015390143,0.0013235675,0.009612783],"category_scores_gemma":[0.0009600249,0.0007113615,0.0010084651,0.0016719206,0.00059897354,0.0011576617,0.00068009726,0.00077993295,0.003482223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028557946,0.000032243734,0.00041155558,0.00010326589,0.00001700205,0.00014856523,0.00007674296,0.89564496,0.002094809,0.053211223,0.0030409335,0.045190122],"study_design_scores_gemma":[0.000008578466,0.000010191038,0.00014505294,0.000017735829,0.00001228074,0.00006020634,0.000014646377,0.9738582,0.00094685814,0.011003164,0.013911332,0.000011744253],"about_ca_topic_score_codex":0.017793404,"about_ca_topic_score_gemma":0.025451263,"teacher_disagreement_score":0.017793404,"about_ca_system_score_codex":0.0009139342,"about_ca_system_score_gemma":0.0014351631,"threshold_uncertainty_score":0.035379708},"labels":[],"label_agreement":null},{"id":"W1997300884","doi":"10.1139/l05-124","title":"Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Inha University","keywords":"Global Positioning System; Productivity; Truck; Engineering; Work (physics); Transport engineering; Industrial engineering; Operations research; Telecommunications; Automotive engineering; Mechanical engineering","score_opus":0.003070543290038536,"score_gpt":0.19453128681888876,"score_spread":0.19146074352885023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1997300884","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9926407,0.000031546333,0.005520879,0.000032945703,0.0000053691424,0.000012627254,0.0001419633,0.000056130793,0.0015578124],"genre_scores_gemma":[0.99858594,0.000021864962,0.0009999714,0.0000027743279,5.6692744e-7,0.0000092657865,0.00009406493,0.0000054756692,0.00028006188],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971086,0.000102021695,0.000015289315,0.000036576283,0.000060716062,0.000074662596],"domain_scores_gemma":[0.9977812,0.0015525712,0.0002003702,0.000099451114,0.00028795938,0.00007841748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007679372,0.00039390684,0.00031557557,0.00057198445,0.0002913148,0.0005696184,0.00045130396,0.00054822234,0.001252826],"category_scores_gemma":[0.0027252315,0.00025713438,0.0005685,0.00075831544,0.0003096171,0.00043058087,0.00029929032,0.0004289927,0.00013304624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010138245,0.000054870296,0.01167898,0.000013635769,0.000016328284,0.00004535397,0.000044163,0.9844617,0.00067596004,0.0002697552,0.00008372101,0.0025541272],"study_design_scores_gemma":[0.0000133350295,0.00011002891,0.0058466014,0.000003391981,0.000017499755,0.000012178108,0.0000731263,0.9926133,0.0010333052,0.00012384789,0.00014605225,0.000007391357],"about_ca_topic_score_codex":0.030342631,"about_ca_topic_score_gemma":0.015130308,"teacher_disagreement_score":0.030342631,"about_ca_system_score_codex":0.00092916447,"about_ca_system_score_gemma":0.0006183703,"threshold_uncertainty_score":0.06033206},"labels":[],"label_agreement":null},{"id":"W1999129289","doi":"10.1155/2014/847430","title":"Hybrid Simulation Environment for Construction Projects: Identification of System Design Criteria","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Schedule; Identification (biology); Process (computing); Systems engineering; Computer science; Simulation modeling; Risk analysis (engineering); Modeling and simulation; System lifecycle; Process management; Engineering; Software engineering; Application lifecycle management; Software","score_opus":0.011200375293203455,"score_gpt":0.2072075331829719,"score_spread":0.19600715788976844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W1999129289","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043952156,0.000069087946,0.94897795,0.00010636463,0.000011498932,0.00019835478,0.00010866281,0.00041766572,0.0061582937],"genre_scores_gemma":[0.6464239,0.00017412294,0.34937945,0.000033457534,0.000012498447,0.00093319366,0.0002424962,0.00013515636,0.0026657658],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984181,0.0008862283,0.00006908278,0.000100190315,0.00041573856,0.00011072768],"domain_scores_gemma":[0.99740016,0.0017802829,0.0001988237,0.00013177752,0.00039145313,0.000097586584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027128393,0.00076733995,0.00072839117,0.0008661741,0.00058406283,0.0018315582,0.0007822656,0.0009309567,0.0032585955],"category_scores_gemma":[0.0054826564,0.000486614,0.000624044,0.0006000223,0.0006351785,0.0013269502,0.0019847448,0.000646531,0.00040200207],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013254295,0.00007428854,0.0017651969,0.00008794111,0.000027316693,0.00009801525,0.00018176748,0.9428797,0.0032591573,0.036889624,0.00036221318,0.014242305],"study_design_scores_gemma":[0.00001302309,0.00003500142,0.00014282859,0.000012025359,0.0000047790622,0.000014747639,0.000030237057,0.9942795,0.0007206472,0.0036196632,0.0011212914,0.0000062115496],"about_ca_topic_score_codex":0.0019925304,"about_ca_topic_score_gemma":0.0018139239,"teacher_disagreement_score":0.0032585955,"about_ca_system_score_codex":0.00085084134,"about_ca_system_score_gemma":0.0015273403,"threshold_uncertainty_score":0.014347076},"labels":[],"label_agreement":null},{"id":"W2000118605","doi":"10.1016/j.autcon.2010.10.002","title":"On-site visualization of building component erection enabled by integration of four-dimensional modeling and automated surveying","year":2011,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Component (thermodynamics); Building model; Software; Visualization; Model building; Position (finance); Computer science; Orientation (vector space); Controller (irrigation); Engineering; Simulation; Data mining","score_opus":0.02104407410854345,"score_gpt":0.23569148847566906,"score_spread":0.21464741436712562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000118605","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56765276,0.0006196671,0.38442847,0.0005891176,0.00014551003,0.00011304592,0.0028886357,0.02582641,0.017736401],"genre_scores_gemma":[0.8837783,0.00033971222,0.11182409,0.000058513517,0.00002497884,0.000049601276,0.0010449289,0.00057954306,0.0023002867],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999778,0.00003347246,0.000007876989,0.000025882291,0.00011757432,0.000037235255],"domain_scores_gemma":[0.99957436,0.00013916174,0.000035731442,0.00009776602,0.00010953327,0.00004344982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029713975,0.0006161891,0.0006903063,0.0012064518,0.00023855534,0.0010564774,0.000572543,0.00056151353,0.007885379],"category_scores_gemma":[0.0005698017,0.00035889022,0.00037159136,0.0011851962,0.00022681271,0.00062229164,0.0010148252,0.0006836649,0.000606264],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014350679,0.0006158623,0.01919531,0.0009260305,0.00019181402,0.001176014,0.002206748,0.10840121,0.34311244,0.006200927,0.023734154,0.49280438],"study_design_scores_gemma":[0.000120356475,0.0001851268,0.052671123,0.00011062905,0.00009970788,0.0007442152,0.0008115107,0.8124312,0.104445785,0.0049393475,0.023264684,0.00017632876],"about_ca_topic_score_codex":0.0031101156,"about_ca_topic_score_gemma":0.006971846,"teacher_disagreement_score":0.007885379,"about_ca_system_score_codex":0.00023811699,"about_ca_system_score_gemma":0.00057461363,"threshold_uncertainty_score":0.026379168},"labels":[],"label_agreement":null},{"id":"W2000923597","doi":"10.1061/(asce)0733-9364(2001)127:4(322)","title":"Improving Design Coordination for Building Projects. I: Information Model","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Component (thermodynamics); Consistency (knowledge bases); Computer science; Process (computing); Set (abstract data type); Design process; Systems engineering; Building information modeling; Conceptual design; Engineering design process; Information model; Hierarchy; Software engineering; Process management; Human–computer interaction; Engineering; Work in process; Artificial intelligence","score_opus":0.008737578101451553,"score_gpt":0.19057015039278882,"score_spread":0.18183257229133726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2000923597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01110437,0.00025965276,0.9740918,0.0007843482,0.00006104314,0.00033131448,0.00036013135,0.0019060916,0.011101266],"genre_scores_gemma":[0.18209936,0.0004448199,0.8093338,0.000105226725,0.000039091534,0.00071765407,0.0014766328,0.00028759244,0.005495895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99325925,0.002246529,0.0007191646,0.0009118709,0.0024576378,0.00040544354],"domain_scores_gemma":[0.99238175,0.00264475,0.00075875066,0.0025701355,0.0012809169,0.0003635543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067560356,0.0010217042,0.0012025698,0.0024906097,0.0016977523,0.007306747,0.0035496172,0.0022503436,0.0056385817],"category_scores_gemma":[0.019533426,0.001018434,0.0015891378,0.0033944873,0.0015598647,0.007969474,0.0036812692,0.0015391763,0.0016561372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038510424,0.00038095555,0.0029461978,0.00048766052,0.000098194694,0.00037142693,0.0014959173,0.5041969,0.0046512885,0.26324072,0.013508965,0.20823675],"study_design_scores_gemma":[0.00009906721,0.00015860364,0.0007185157,0.00013110675,0.00009474251,0.00019197521,0.00034080495,0.90152895,0.004695033,0.054425914,0.037552796,0.000062413965],"about_ca_topic_score_codex":0.011680173,"about_ca_topic_score_gemma":0.010874109,"teacher_disagreement_score":0.011680173,"about_ca_system_score_codex":0.00386997,"about_ca_system_score_gemma":0.006141645,"threshold_uncertainty_score":0.035729766},"labels":[],"label_agreement":null},{"id":"W2004170337","doi":"10.1139/l07-112","title":"Sustainable precast concrete foundation system for residential construction","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Alberta Conservation Association; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Constructability; Precast concrete; Engineering; Civil engineering; Foundation (evidence); Framing (construction); Construction engineering; Architectural engineering; Standardization; Structural system; Expanded polystyrene; Structural engineering; Computer science","score_opus":0.006524337346697619,"score_gpt":0.17009054777254654,"score_spread":0.16356621042584893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2004170337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31933016,0.0027689657,0.4352163,0.00051800674,0.00019691998,0.00075509894,0.001204612,0.0035687827,0.23644121],"genre_scores_gemma":[0.8036269,0.0014956254,0.15579002,0.000060947383,0.000027290129,0.00016580147,0.0009918569,0.00014134572,0.037700295],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99957174,0.000040449708,0.000011127522,0.000032585616,0.00029787555,0.000046198278],"domain_scores_gemma":[0.99986684,0.000010992446,0.000013991443,0.000032430748,0.000053114825,0.000022583446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023778692,0.00032273482,0.00016245873,0.0010603135,0.00072586956,0.0006137278,0.0005583357,0.0004550894,0.007091679],"category_scores_gemma":[0.00034361612,0.00013508432,0.0002479025,0.0009945248,0.0003061374,0.0004925141,0.00066040654,0.00032439842,0.002224048],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014901497,0.00015529146,0.006741692,0.0005466105,0.000030722338,0.00090009737,0.00043777347,0.05251767,0.11645159,0.07231345,0.011843383,0.7379128],"study_design_scores_gemma":[0.000088525354,0.0010905255,0.05539135,0.00034461683,0.00012167247,0.0065738796,0.0014965192,0.095753066,0.13671325,0.026476918,0.6757514,0.0001983603],"about_ca_topic_score_codex":0.008264134,"about_ca_topic_score_gemma":0.027418504,"teacher_disagreement_score":0.008264134,"about_ca_system_score_codex":0.00087621,"about_ca_system_score_gemma":0.0019665314,"threshold_uncertainty_score":0.02372402},"labels":[],"label_agreement":null},{"id":"W2005451988","doi":"10.1139/l09-091","title":"Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Emissions Reduction Alberta; Canadian Natural Resources","funders":"","keywords":"Discrete event simulation; Expert system; Computer science; Fuzzy logic; Event (particle physics); Probabilistic logic; Relevance (law); Industrial engineering; Systems engineering; Simulation modeling; Data mining; Machine learning; Engineering; Artificial intelligence; Simulation","score_opus":0.017738548686402577,"score_gpt":0.242917076871011,"score_spread":0.22517852818460843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005451988","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00047207208,0.00004697007,0.9982418,0.000043790482,0.000015473717,0.000057659352,0.000012512559,0.000059542675,0.0010501776],"genre_scores_gemma":[0.03853752,0.00018299947,0.9599345,0.00004071236,0.000023786655,0.0003637906,0.000053933516,0.000027776076,0.0008350679],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965193,0.0017941529,0.00026532286,0.00027848323,0.0010414191,0.00010125693],"domain_scores_gemma":[0.9964503,0.0024108621,0.00022197483,0.00033400382,0.0004982693,0.0000845315],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005423532,0.000976755,0.0010411002,0.0023270515,0.00068166567,0.0019345308,0.002295211,0.0013092809,0.003447827],"category_scores_gemma":[0.008364215,0.0008827308,0.001706157,0.0016066984,0.0014266566,0.0016748603,0.0018154979,0.00185447,0.000698276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034851822,0.00015010992,0.0007040803,0.00032174683,0.0002412915,0.00029903723,0.0004008973,0.41959453,0.0024988598,0.47222298,0.0010851698,0.10244643],"study_design_scores_gemma":[0.00003597698,0.000081912476,0.00017380723,0.00010693003,0.000050486808,0.00014725444,0.00006974925,0.80789506,0.0019634704,0.17472892,0.014699319,0.000047102167],"about_ca_topic_score_codex":0.0029526534,"about_ca_topic_score_gemma":0.0034185573,"teacher_disagreement_score":0.005423532,"about_ca_system_score_codex":0.0014599492,"about_ca_system_score_gemma":0.0021895398,"threshold_uncertainty_score":0.028682709},"labels":[],"label_agreement":null},{"id":"W2005733202","doi":"10.1108/09699981211237111","title":"Modelling industrial construction operations using a multi‐agent resource allocation framework","year":2012,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Resource allocation; Schedule; Scheduling (production processes); Process (computing); Set (abstract data type); Resource (disambiguation); Function (biology); Operations research; Industrial engineering; Mathematical optimization; Distributed computing; Engineering","score_opus":0.028777039970409566,"score_gpt":0.22301367396733698,"score_spread":0.19423663399692742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005733202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05476692,0.00027386093,0.930097,0.00029943,0.000033245542,0.00023736586,0.00015639927,0.00025781355,0.013877923],"genre_scores_gemma":[0.6963807,0.0007100101,0.294791,0.000055863875,0.000024055367,0.0006043166,0.0001764879,0.00006605635,0.007191534],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957556,0.00020560286,0.000021097525,0.00005801452,0.00009105638,0.00004865051],"domain_scores_gemma":[0.9997002,0.0001561854,0.00005702924,0.000022424443,0.00003974022,0.000024437237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060956314,0.0005857085,0.00052076764,0.0005901803,0.00067001075,0.0015019629,0.0013291795,0.0010024833,0.0025755554],"category_scores_gemma":[0.000788846,0.0004339046,0.000839816,0.00071910385,0.00071530946,0.001264964,0.00087223575,0.0007015153,0.00028287424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000119445185,0.000019378032,0.0001907787,0.000020927167,0.000010706589,0.00003749901,0.000040886942,0.9847401,0.0005709843,0.011631168,0.000105952386,0.0026196195],"study_design_scores_gemma":[0.0000106106645,0.000017176291,0.00011742556,0.0000083752075,0.000008172166,0.000013019155,0.000035829715,0.99399525,0.00018404015,0.004107803,0.0014966697,0.0000056547215],"about_ca_topic_score_codex":0.01597164,"about_ca_topic_score_gemma":0.013807372,"teacher_disagreement_score":0.01597164,"about_ca_system_score_codex":0.0013954072,"about_ca_system_score_gemma":0.0019930853,"threshold_uncertainty_score":0.031757355},"labels":[],"label_agreement":null},{"id":"W2005746601","doi":"10.1061/(asce)cp.1943-5487.0000181","title":"Multiagent Approach for Real-Time Collision Avoidance and Path Replanning for Cranes","year":2011,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":79,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Collision avoidance; Real-time locating system; Multi-agent system; SAFER; Motion planning; Computer science; Collision; Path (computing); Real-time computing; Collision detection; Collision avoidance system; Engineering; State (computer science); Simulation; Artificial intelligence; Computer security; Computer network; Robot","score_opus":0.014768518578219663,"score_gpt":0.20919335986865426,"score_spread":0.19442484129043458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005746601","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013453006,0.00045585012,0.9792448,0.00014711254,0.00007870657,0.00012523845,0.000018091656,0.00043307658,0.0060440055],"genre_scores_gemma":[0.6251436,0.0005075955,0.36401352,0.0001225213,0.000063536725,0.0003739335,0.000077334036,0.000064663574,0.009633302],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995204,0.00013605834,0.000033106066,0.000096252814,0.00015864699,0.00005560643],"domain_scores_gemma":[0.999729,0.00007852238,0.000051004157,0.000023704053,0.00008311424,0.00003474246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051115657,0.00071528595,0.0005472956,0.0004773893,0.0008771114,0.0010160931,0.0011559712,0.0009190802,0.0018731055],"category_scores_gemma":[0.00067033165,0.00034184242,0.00061039825,0.00026547798,0.0004625791,0.00068387314,0.001145299,0.0008230566,0.0003614603],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015900507,0.00016738735,0.0015547266,0.00034203107,0.00019140131,0.0008542418,0.00061063096,0.79304266,0.02996839,0.03662982,0.0028318374,0.13364783],"study_design_scores_gemma":[0.000024559447,0.00007744459,0.00024269306,0.000013883447,0.000033243923,0.00009530127,0.000094170944,0.9852651,0.0025635231,0.0036714943,0.007902807,0.000015824593],"about_ca_topic_score_codex":0.0046922243,"about_ca_topic_score_gemma":0.0044659097,"teacher_disagreement_score":0.0046922243,"about_ca_system_score_codex":0.0005480113,"about_ca_system_score_gemma":0.0009760872,"threshold_uncertainty_score":0.009329855},"labels":[],"label_agreement":null},{"id":"W2005915515","doi":"10.1016/j.autcon.2014.06.001","title":"Automating motion trajectory Of crane-lifted loads","year":2014,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Payload (computing); Rotation (mathematics); Trajectory; Computer science; Path (computing); Lift (data mining); Constant (computer programming); Control theory (sociology); Translation (biology); Function (biology); Motion (physics); Simulation; Artificial intelligence; Physics; Control (management)","score_opus":0.005433267552173013,"score_gpt":0.1955430761779907,"score_spread":0.19010980862581767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2005915515","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2709782,0.00015417907,0.7160093,0.00007935823,0.000047028912,0.00013340478,0.00034108298,0.003711484,0.008545849],"genre_scores_gemma":[0.91481715,0.00010032515,0.08066868,0.000012535939,0.000005325869,0.000053015672,0.0004103074,0.00011870719,0.0038138388],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982315,0.000016433929,0.000004973858,0.00004791972,0.00007396704,0.000033496453],"domain_scores_gemma":[0.99986005,0.0000211309,0.000017001725,0.000029007644,0.00005815114,0.000014619326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019261536,0.0005925987,0.00040276293,0.00064954156,0.0006745032,0.00038354474,0.0004320329,0.00036178468,0.0030763727],"category_scores_gemma":[0.0005112082,0.00029996992,0.00025525744,0.00046260667,0.00024355402,0.0004046014,0.0007184504,0.00041796235,0.0010738745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005738426,0.00011954364,0.007159751,0.00024970758,0.000047044094,0.00037787698,0.00074051495,0.28844234,0.12431727,0.005367261,0.0035697652,0.56903505],"study_design_scores_gemma":[0.000018241952,0.00009635315,0.008308055,0.000021882199,0.000013540632,0.00009830331,0.00019572818,0.95125055,0.03415686,0.0013185643,0.0045022937,0.000019606941],"about_ca_topic_score_codex":0.014237603,"about_ca_topic_score_gemma":0.015841309,"teacher_disagreement_score":0.014237603,"about_ca_system_score_codex":0.0003470077,"about_ca_system_score_gemma":0.0011541278,"threshold_uncertainty_score":0.028309464},"labels":[],"label_agreement":null},{"id":"W2006902389","doi":"10.1139/l09-094","title":"Large-scale simulation modeling system for industrial construction","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Systems engineering; Plan (archaeology); Engineering; Production (economics); Supply chain; Scale (ratio); Industrial engineering; Computer science; Manufacturing engineering","score_opus":0.013377203913686611,"score_gpt":0.19084621518696118,"score_spread":0.17746901127327458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2006902389","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020114876,0.000100537865,0.9368883,0.00017004536,0.00010932605,0.000427683,0.0022836858,0.023633072,0.016272573],"genre_scores_gemma":[0.485889,0.0004761228,0.48031098,0.00011906759,0.000052362546,0.002563553,0.009264178,0.0029568328,0.018367898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995285,0.00014677101,0.00004785359,0.00007618681,0.00016273999,0.00003789688],"domain_scores_gemma":[0.999453,0.0001697468,0.000030755393,0.00012656649,0.00017490846,0.000045064597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007676263,0.0008429254,0.0008254494,0.0006149509,0.0007018128,0.0010590944,0.0016973788,0.0009062889,0.015328706],"category_scores_gemma":[0.001461327,0.0005450077,0.001073317,0.00069780194,0.00034371638,0.0009914766,0.001138462,0.0010569888,0.0033904454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014854869,0.00016267247,0.0020987636,0.00013972782,0.000066756445,0.00016321946,0.00025598318,0.9304651,0.009570599,0.019962164,0.010738718,0.026227755],"study_design_scores_gemma":[0.000037631115,0.000019253132,0.0002419405,0.00000833762,0.000013798542,0.00002184295,0.00001420272,0.97605467,0.0023755657,0.0019546482,0.019243905,0.0000142399895],"about_ca_topic_score_codex":0.009156868,"about_ca_topic_score_gemma":0.006603971,"teacher_disagreement_score":0.015328706,"about_ca_system_score_codex":0.0011609105,"about_ca_system_score_gemma":0.0017174353,"threshold_uncertainty_score":0.051279604},"labels":[],"label_agreement":null},{"id":"W2013284030","doi":"10.3850/978-981-08-7920-4_s1-cp25-cd","title":"Cost and Experience based Method for Project Acceleration","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Acceleration; Computer science; Physics","score_opus":0.09677556336801335,"score_gpt":0.31439143953105536,"score_spread":0.217615876163042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2013284030","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030562105,0.00021455098,0.95520204,0.00008082646,0.00009214479,0.00015575593,0.00022462696,0.00069804,0.01276986],"genre_scores_gemma":[0.5034921,0.00030849304,0.48115516,0.00004189473,0.00007367783,0.0004174201,0.0004404309,0.00022194389,0.013848752],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99805707,0.00042412864,0.000083446306,0.0002064217,0.0011073394,0.000121572855],"domain_scores_gemma":[0.9984295,0.00056902814,0.000107435626,0.00022870017,0.0006106725,0.000054572833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009188321,0.00067041157,0.00063813536,0.0023653202,0.0003200382,0.0009033547,0.0009146577,0.00043923332,0.0103871925],"category_scores_gemma":[0.0031626248,0.00028496832,0.0005621457,0.0019306974,0.0003401617,0.0012005824,0.0010427802,0.00048192436,0.0012490959],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000427128,0.00032000997,0.003959423,0.00032804147,0.00008165808,0.0001142796,0.00026938086,0.05594865,0.017752605,0.0450536,0.004140131,0.8716051],"study_design_scores_gemma":[0.00008682437,0.0007619847,0.012902979,0.00007563285,0.0001530207,0.00058527454,0.00032858065,0.91552263,0.02650767,0.02070742,0.022245623,0.00012233158],"about_ca_topic_score_codex":0.002347201,"about_ca_topic_score_gemma":0.0028246737,"teacher_disagreement_score":0.0103871925,"about_ca_system_score_codex":0.0006308056,"about_ca_system_score_gemma":0.00076336466,"threshold_uncertainty_score":0.034748614},"labels":[],"label_agreement":null},{"id":"W2014164765","doi":"10.1061/40571(304)6","title":"Optimal Maintenance Planning of Reinforced Concrete Decks on Highway Network","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Ottawa","keywords":"Computer science; Genetic algorithm; Scheduling (production processes); Reinforced concrete; Transport engineering; Engineering; Structural engineering","score_opus":0.009578426595386125,"score_gpt":0.20783338035511506,"score_spread":0.19825495375972893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2014164765","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60393703,0.0004674375,0.38811755,0.00015216731,0.000020936071,0.00011473766,0.00023898382,0.00030180273,0.006649353],"genre_scores_gemma":[0.9597584,0.00013061191,0.03863412,0.0000076222123,0.000004858484,0.000036275043,0.0001292871,0.000018306828,0.0012805872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998393,0.00004232511,0.0000056952567,0.00003546446,0.000032245032,0.000044827437],"domain_scores_gemma":[0.9998258,0.00007962119,0.00003095989,0.000009244693,0.000030946754,0.000023394661],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026508773,0.00039756048,0.00050513726,0.000580389,0.00029910376,0.0005289039,0.00038093477,0.00046096672,0.0010086318],"category_scores_gemma":[0.00066785846,0.00037968595,0.000275027,0.00038296473,0.0003739186,0.0003946672,0.00021339278,0.0002468859,0.000098267556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027940023,0.000008888008,0.0002947034,0.000012926698,0.0000045214083,0.000036045352,0.000015033578,0.9910353,0.0011037065,0.0012407582,0.00011459112,0.0061055436],"study_design_scores_gemma":[0.000005586127,0.000020119756,0.00030896635,0.0000023586654,0.0000044566486,0.000007881812,0.000014897163,0.9975674,0.0006282638,0.0012545943,0.00018252812,0.000002968077],"about_ca_topic_score_codex":0.017395834,"about_ca_topic_score_gemma":0.015608436,"teacher_disagreement_score":0.017395834,"about_ca_system_score_codex":0.0010713266,"about_ca_system_score_gemma":0.0010806384,"threshold_uncertainty_score":0.03458911},"labels":[],"label_agreement":null},{"id":"W2015560731","doi":"10.1061/(asce)0887-3801(2004)18:2(115)","title":"Framework for Managing Life-Cycle Cost of Smart Infrastructure Systems","year":2004,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Activity-based costing; Life cycle costing; Computer science; System lifecycle; Cost driver; Risk analysis (engineering); Systems engineering; Engineering; Construction engineering; Business; Application lifecycle management; Software","score_opus":0.006303854287841952,"score_gpt":0.2135090053000524,"score_spread":0.20720515101221046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2015560731","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006759947,0.000623207,0.97574264,0.00081168656,0.00005703322,0.00027441737,0.0005673861,0.0003071553,0.014856525],"genre_scores_gemma":[0.38855323,0.0020296425,0.59546465,0.00019166694,0.00013983046,0.0018678088,0.0011886121,0.00029510245,0.010269369],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997552,0.00069318543,0.00012246084,0.0002693554,0.001057926,0.00030511784],"domain_scores_gemma":[0.9983537,0.0006503554,0.00014657684,0.00014606696,0.0005882351,0.00011502249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003897256,0.002577537,0.001740016,0.0032246846,0.0010957631,0.0045594024,0.004451988,0.0022357353,0.00565084],"category_scores_gemma":[0.004949418,0.0009617823,0.002032921,0.0024868583,0.001256116,0.0044680005,0.0020541942,0.0024708821,0.0008806587],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011487183,0.000042824227,0.00020750267,0.00006464459,0.00002937969,0.00006899472,0.000041584244,0.79632455,0.00026561593,0.19005866,0.0013591095,0.011525515],"study_design_scores_gemma":[0.000014056161,0.00002505514,0.00012816278,0.00003805947,0.000018980081,0.000040397495,0.00003652796,0.91031194,0.0002903365,0.08243104,0.006644935,0.00002053867],"about_ca_topic_score_codex":0.019104127,"about_ca_topic_score_gemma":0.015983598,"teacher_disagreement_score":0.019104127,"about_ca_system_score_codex":0.005882547,"about_ca_system_score_gemma":0.0050572627,"threshold_uncertainty_score":0.04268104},"labels":[],"label_agreement":null},{"id":"W2016010091","doi":"10.1061/(asce)0733-9364(2005)131:8(938)","title":"Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":118,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Relevance (law); Expert system; Fuzzy logic; Productivity; Computer science; Data mining; Industrial engineering; Artificial intelligence; Machine learning; Engineering; Economics","score_opus":0.011977122586400246,"score_gpt":0.20138050444172867,"score_spread":0.18940338185532843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2016010091","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5914377,0.00012929252,0.4022873,0.0002848677,0.000023879926,0.00010193623,0.00019064765,0.0005063634,0.0050380663],"genre_scores_gemma":[0.93991446,0.00008788864,0.05897087,0.000022258848,0.000006987978,0.000052922594,0.00013060996,0.0000074048876,0.0008066681],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99929833,0.00028606312,0.000048079266,0.00011535377,0.00019776897,0.000054310123],"domain_scores_gemma":[0.9976497,0.0017028167,0.0001637799,0.00011880532,0.0003215815,0.000043335567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017956028,0.0004898623,0.0005259782,0.0010697101,0.0004173118,0.0011400199,0.000643696,0.0009556691,0.001099993],"category_scores_gemma":[0.0073643196,0.00032704353,0.00040560318,0.00077844714,0.00036113273,0.0010049839,0.00040291535,0.00047680415,0.00021054593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006171897,0.00007627238,0.00530915,0.000026001924,0.000024089371,0.00008234735,0.00012795166,0.95747524,0.0012587032,0.0013593646,0.00028989752,0.033909258],"study_design_scores_gemma":[0.0000056424096,0.000021182488,0.0011426349,0.0000064172555,0.0000046602054,0.0000087596445,0.000032984673,0.9967001,0.0005970139,0.0013112578,0.00016114749,0.000008237892],"about_ca_topic_score_codex":0.012812111,"about_ca_topic_score_gemma":0.0106716445,"teacher_disagreement_score":0.012812111,"about_ca_system_score_codex":0.0009710685,"about_ca_system_score_gemma":0.0008530831,"threshold_uncertainty_score":0.025475085},"labels":[],"label_agreement":null},{"id":"W2019060119","doi":"10.1016/j.autcon.2008.08.001","title":"Visualizing high-rise building construction strategies using linear scheduling and 4D CAD","year":2008,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Scheduling (production processes); Computer science; Visualization; CAD; Project management; Software engineering; Systems engineering; Industrial engineering; Engineering; Engineering drawing; Operations management; Artificial intelligence","score_opus":0.0170725969977628,"score_gpt":0.2583357278586067,"score_spread":0.2412631308608439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019060119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3853173,0.0005729191,0.5764759,0.00071846927,0.00012503307,0.00021236797,0.0015471332,0.008249111,0.026781771],"genre_scores_gemma":[0.7839554,0.00041790275,0.2100412,0.000055087483,0.00002370289,0.00010223211,0.00049595174,0.0005421665,0.0043663695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998561,0.00003091725,0.000007754992,0.000018693301,0.000050424092,0.00003610555],"domain_scores_gemma":[0.9996216,0.00019319911,0.000034769357,0.000039252278,0.000057122732,0.000054029308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027754073,0.0009276921,0.0004728245,0.0012390877,0.0003519942,0.0012779289,0.0006250961,0.000577188,0.013285335],"category_scores_gemma":[0.00062602863,0.00058991736,0.00050575443,0.0013551745,0.00041343705,0.0006255157,0.0006424127,0.00065391714,0.0007661606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00096072257,0.00050300854,0.006120149,0.00059664826,0.000086075874,0.0005790267,0.0018330686,0.71177137,0.07051379,0.023057723,0.007825032,0.17615333],"study_design_scores_gemma":[0.00008512747,0.00012872017,0.0036773821,0.000039352348,0.000029734896,0.00010994461,0.0004682625,0.970456,0.012612246,0.0054619648,0.0068650246,0.00006623553],"about_ca_topic_score_codex":0.0092525575,"about_ca_topic_score_gemma":0.014888385,"teacher_disagreement_score":0.013285335,"about_ca_system_score_codex":0.0007526686,"about_ca_system_score_gemma":0.0012531888,"threshold_uncertainty_score":0.044443905},"labels":[],"label_agreement":null},{"id":"W2019386889","doi":"10.1061/(asce)0733-9364(2002)128:2(174)","title":"Unified Modeling Methodology for Construction Simulation","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":193,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Flexibility (engineering); Systems engineering; Software engineering; Software; Management science; Industrial engineering; Engineering; Programming language","score_opus":0.040046077586934486,"score_gpt":0.24185171052688742,"score_spread":0.20180563293995293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2019386889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005409058,0.0011988332,0.98968107,0.00028589283,0.00019049055,0.00014358209,0.00014608398,0.00049639976,0.007316805],"genre_scores_gemma":[0.041942213,0.003518362,0.9442558,0.00022278164,0.0001659238,0.0017782083,0.00088665244,0.0003244941,0.0069054766],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971553,0.0013182692,0.0002695011,0.00020091746,0.0009121809,0.00014374926],"domain_scores_gemma":[0.9989679,0.0004158965,0.00008565772,0.00018831051,0.00027805634,0.00006424969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037130427,0.0016975438,0.0016469494,0.0030347435,0.0011393115,0.0028835959,0.0033858872,0.001770947,0.0073370594],"category_scores_gemma":[0.0034499478,0.0008750361,0.0031106537,0.0027040425,0.0012928821,0.0027102756,0.0026970124,0.0024535425,0.001833737],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001505545,0.000027118913,0.00016554134,0.00024624055,0.0000692437,0.00012685898,0.00025615888,0.085587464,0.000698729,0.87631994,0.005028534,0.03145909],"study_design_scores_gemma":[0.000051318028,0.00009098121,0.00017829401,0.00039678952,0.000089925015,0.00027170364,0.00016068888,0.33426148,0.0010612924,0.352218,0.31115678,0.00006267393],"about_ca_topic_score_codex":0.004499467,"about_ca_topic_score_gemma":0.004099125,"teacher_disagreement_score":0.0073370594,"about_ca_system_score_codex":0.0020160011,"about_ca_system_score_gemma":0.0034950036,"threshold_uncertainty_score":0.024544895},"labels":[],"label_agreement":null},{"id":"W2021332829","doi":"10.1016/j.ejor.2011.06.011","title":"Models and algorithms to improve earthwork operations in road design using mixed integer linear programming","year":2011,"lang":"en","type":"article","venue":"European Journal of Operational Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":85,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Earthworks; Integer programming; Linear programming; Integer (computer science); Mathematical optimization; Computer science; Set (abstract data type); Process (computing); Linear model; Algorithm; Mathematics; Engineering","score_opus":0.16808669972142634,"score_gpt":0.33526374380344826,"score_spread":0.16717704408202191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2021332829","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012460021,0.00016531342,0.98446554,0.00014830589,0.000044768545,0.000048297243,0.00005634438,0.0002756668,0.0023358096],"genre_scores_gemma":[0.3465164,0.00026691085,0.6477633,0.00012266528,0.000065645465,0.00042090123,0.00026444695,0.00021444188,0.004365206],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919623,0.00038685367,0.000033122986,0.00011314408,0.00017962132,0.000090994756],"domain_scores_gemma":[0.9976921,0.0016585437,0.00017866414,0.00009460959,0.000314828,0.00006127522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018646562,0.0013427102,0.0015376674,0.0010610835,0.0006268851,0.0017391507,0.0018960823,0.0016373588,0.004355662],"category_scores_gemma":[0.004641324,0.0011636602,0.0012983698,0.0012529232,0.0007140488,0.0021000528,0.0012053548,0.0018896789,0.0005612596],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017696479,0.000033391745,0.00007604846,0.000018786854,0.000008622536,0.000005083063,0.0000090215135,0.9875466,0.000102362006,0.001782539,0.00021752714,0.010182418],"study_design_scores_gemma":[0.0000029246446,0.000005930287,0.0000073612628,0.000001956655,0.0000020231969,7.748066e-7,0.0000024743615,0.9990646,0.00006996879,0.0007626181,0.00007830619,9.764052e-7],"about_ca_topic_score_codex":0.010042385,"about_ca_topic_score_gemma":0.009637179,"teacher_disagreement_score":0.010042385,"about_ca_system_score_codex":0.0010036238,"about_ca_system_score_gemma":0.0015160599,"threshold_uncertainty_score":0.019967914},"labels":[],"label_agreement":null},{"id":"W2022308534","doi":"10.1061/40754(183)119","title":"Case Study of Constructability Reasoning in MEP Coordination","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Process (computing); Computer science; Building information modeling; Table (database); Overlay; Systems engineering; Iterative and incremental development; Body of knowledge; Knowledge management; Process management; Software engineering; Engineering; Data mining; Operations management","score_opus":0.009826469734514141,"score_gpt":0.22945843912910036,"score_spread":0.2196319693945862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022308534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60663885,0.00036153564,0.30522484,0.0036583932,0.00006459828,0.0007763036,0.0007002665,0.0005889495,0.08198635],"genre_scores_gemma":[0.91417205,0.000124094,0.08055438,0.000113050315,0.000014911295,0.00018146285,0.0003178852,0.000063206084,0.0044590184],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.98874414,0.0063760537,0.0006131168,0.00081690605,0.0025658484,0.0008838527],"domain_scores_gemma":[0.98084176,0.013617195,0.0011234599,0.0026136998,0.0011790596,0.00062488177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0080701485,0.0006071945,0.0005472565,0.0023645777,0.0054691816,0.0033687635,0.0027623905,0.003929029,0.005320695],"category_scores_gemma":[0.023423985,0.00047795498,0.00091131986,0.0028735471,0.0046137595,0.003973653,0.0038098183,0.0022583446,0.00062822603],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001143796,0.0015033016,0.034125198,0.0009033746,0.00014321583,0.10473428,0.10528237,0.15300764,0.010450237,0.41506284,0.013077948,0.16056582],"study_design_scores_gemma":[0.000317304,0.00089229026,0.021833586,0.00083036226,0.00020429099,0.028048672,0.10101678,0.36039022,0.03834641,0.17641295,0.2714157,0.00029138298],"about_ca_topic_score_codex":0.012734674,"about_ca_topic_score_gemma":0.013137168,"teacher_disagreement_score":0.012734674,"about_ca_system_score_codex":0.0032911224,"about_ca_system_score_gemma":0.0028513232,"threshold_uncertainty_score":0.04267955},"labels":[],"label_agreement":null},{"id":"W2022776917","doi":"10.1061/(asce)cp.1943-5487.0000467","title":"3D Visualization-Based Motion Planning of Mobile Crane Operations in Heavy Industrial Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Visualization; Modular design; Collision; Computer science; Set (abstract data type); Rotation (mathematics); Simulation; Engineering; Artificial intelligence","score_opus":0.014383784901511125,"score_gpt":0.2397754236961703,"score_spread":0.22539163879465918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2022776917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12516727,0.00022840028,0.8695206,0.000109021115,0.000013444468,0.000120329234,0.00015890459,0.0017928927,0.0028891081],"genre_scores_gemma":[0.6970374,0.00039956256,0.30113786,0.000013040782,0.0000073473357,0.00012489,0.00020515786,0.00014067211,0.00093412405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998079,0.00006536183,0.000009476751,0.000033414457,0.00006071061,0.000023164772],"domain_scores_gemma":[0.99970067,0.00015701704,0.000034093668,0.000030991017,0.000049095812,0.000028141001],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030611115,0.0006868852,0.0003857746,0.000798173,0.00029628375,0.000647539,0.0005247074,0.00044159882,0.0014757835],"category_scores_gemma":[0.0009000316,0.00051253993,0.00045332676,0.00042289027,0.00041313216,0.00038662786,0.00073076587,0.0003519439,0.00021717863],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024313125,0.00006668859,0.0028578294,0.00016996395,0.000027126547,0.00034846214,0.0007257015,0.8347666,0.0338862,0.0041009234,0.0009357634,0.12187169],"study_design_scores_gemma":[0.000014188089,0.000043265554,0.001276673,0.000017838891,0.000008357109,0.000071271235,0.00011379567,0.98914194,0.006980946,0.00089221814,0.0014214506,0.000018076731],"about_ca_topic_score_codex":0.0062289652,"about_ca_topic_score_gemma":0.0073817163,"teacher_disagreement_score":0.0062289652,"about_ca_system_score_codex":0.0003250442,"about_ca_system_score_gemma":0.00070932053,"threshold_uncertainty_score":0.012385368},"labels":[],"label_agreement":null},{"id":"W2023346663","doi":"10.1061/(asce)0733-9364(2005)131:3(354)","title":"Change Orders Impact on Labor Productivity","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"National Evidence-based Healthcare Collaborating Agency","keywords":"Productivity; Change order; Field (mathematics); Computer science; Work (physics); Artificial neural network; Operations research; Industrial engineering; Engineering; Economics; Systems engineering; Project management; Economic growth; Artificial intelligence; Mathematics","score_opus":0.006143367867799938,"score_gpt":0.20308804547351975,"score_spread":0.19694467760571982,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023346663","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97422045,0.00011957953,0.019390767,0.00017644299,0.000024741574,0.000073729716,0.00020563086,0.00006505333,0.0057236976],"genre_scores_gemma":[0.99718285,0.0000641714,0.0015194268,0.000012149527,0.000004996032,0.000021183432,0.00008129319,0.0000061447677,0.0011078196],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9979791,0.00050988287,0.00010400423,0.00021359748,0.00090149866,0.00029187882],"domain_scores_gemma":[0.99252725,0.0052914685,0.0009099584,0.0003346509,0.00074847136,0.00018818998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014219317,0.00050186936,0.00042599626,0.00074755657,0.00037181162,0.0012343639,0.00056820887,0.00068448833,0.0033581643],"category_scores_gemma":[0.011375075,0.00027024382,0.00041861465,0.0007297397,0.00057190005,0.0010016337,0.00070204464,0.0007607558,0.00036706706],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090231193,0.0006389888,0.117376916,0.00015250899,0.0000700287,0.00070282037,0.0007168419,0.80073446,0.005960921,0.0026305206,0.0005514365,0.06956223],"study_design_scores_gemma":[0.000033304656,0.00080650835,0.1453893,0.000024682788,0.00004939428,0.0001524488,0.0007612654,0.840105,0.0076087927,0.0032076095,0.0018000304,0.00006166671],"about_ca_topic_score_codex":0.0118954405,"about_ca_topic_score_gemma":0.012798632,"teacher_disagreement_score":0.0118954405,"about_ca_system_score_codex":0.0022280929,"about_ca_system_score_gemma":0.0011007965,"threshold_uncertainty_score":0.023652434},"labels":[],"label_agreement":null},{"id":"W2023617898","doi":"10.1558/rsth.v23i1.6","title":"Hybrid Constructions","year":2004,"lang":"en","type":"article","venue":"Religious Studies and Theology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Wilfrid Laurier University","funders":"","keywords":"Computer science; Linguistics; Mathematics; Physics; Philosophy","score_opus":0.006888747682465781,"score_gpt":0.21759885975733106,"score_spread":0.21071011207486529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2023617898","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037963092,0.000309508,0.027935145,0.0010569987,0.00036358612,0.00004084405,0.00020793104,0.00016472653,0.96612495],"genre_scores_gemma":[0.4557995,0.0006913404,0.03464157,0.00097199867,0.00028083325,0.00025029643,0.0008073159,0.0005418383,0.5060153],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990792,0.00030520983,0.000036691094,0.00022680317,0.00022125959,0.00013075848],"domain_scores_gemma":[0.99954456,0.000093135444,0.000029452454,0.00018451425,0.00010418149,0.000044186396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065768935,0.0006327179,0.00027650304,0.00088375714,0.002990893,0.0039878855,0.0007965887,0.0013949522,0.08059123],"category_scores_gemma":[0.0014602887,0.00034594542,0.0005345466,0.0007032808,0.004932131,0.004391888,0.0030512502,0.0024325738,0.018050736],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000067440155,0.000004165743,0.000030232539,0.000010184228,0.0000016676078,0.000019319747,0.0005550453,0.00003381653,0.00014313885,0.9906075,0.00390964,0.004678557],"study_design_scores_gemma":[0.000014552362,0.000018346851,0.00026942586,0.000048471014,0.000008273155,0.0002696567,0.0015362343,0.0005556231,0.00096746976,0.45815182,0.53814673,0.000013367377],"about_ca_topic_score_codex":0.0014746268,"about_ca_topic_score_gemma":0.0019358479,"teacher_disagreement_score":0.08059123,"about_ca_system_score_codex":0.0012934858,"about_ca_system_score_gemma":0.00045943836,"threshold_uncertainty_score":0.2696045},"labels":[],"label_agreement":null},{"id":"W2024292964","doi":"10.1061/41109(373)90","title":"Developing a Framework for Construction Contractor Qualification for Surety Bonding","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Surety; Process (computing); Construction industry; Risk analysis (engineering); Project management; Construction engineering; Bond; Engineering management; Fuzzy logic; Computer science; Engineering; Business; Systems engineering; Finance; Artificial intelligence","score_opus":0.023282076237972245,"score_gpt":0.2775408541685669,"score_spread":0.25425877793059465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2024292964","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000788157,0.00014503469,0.98938304,0.00044077198,0.000035128065,0.00017317178,0.000039520568,0.00013048288,0.008864762],"genre_scores_gemma":[0.03886606,0.0003092775,0.95640653,0.00012160113,0.000042090207,0.0004905127,0.00012958725,0.000070059315,0.0035642192],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.994155,0.0027210996,0.0004908971,0.0007263982,0.0014913467,0.00041527342],"domain_scores_gemma":[0.9970324,0.0013874193,0.00028392594,0.00035603158,0.0007511649,0.0001889629],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009376326,0.0014039744,0.00096786756,0.0031857481,0.0028731166,0.006248592,0.0050830985,0.004252731,0.008075945],"category_scores_gemma":[0.0092549315,0.0012920942,0.0029252488,0.002709866,0.0066307588,0.006750889,0.0043966593,0.0037276503,0.0020515546],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000043326354,0.000027210092,0.00012487739,0.00005721417,0.000008924224,0.00018512127,0.00051514903,0.023832727,0.00025792638,0.96346074,0.00086132996,0.010664394],"study_design_scores_gemma":[0.000023975395,0.000043260912,0.00018082508,0.00031507236,0.000021952625,0.00027663825,0.00055429654,0.21946698,0.0010172038,0.7109295,0.06711012,0.00006020784],"about_ca_topic_score_codex":0.019022347,"about_ca_topic_score_gemma":0.017457912,"teacher_disagreement_score":0.019022347,"about_ca_system_score_codex":0.005163796,"about_ca_system_score_gemma":0.008067282,"threshold_uncertainty_score":0.04958737},"labels":[],"label_agreement":null},{"id":"W20251927","doi":"","title":"Accelerated Construction of Bridges: The Path Toward a Holistic Decision-Making System","year":2007,"lang":"en","type":"article","venue":"Transportation Research Board 86th Annual MeetingTransportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Work (physics); Transport engineering; Risk analysis (engineering); Action (physics); Order (exchange); Engineering; Quality (philosophy); State (computer science); Construction engineering; Computer science; Operations research; Business","score_opus":0.057854339021741766,"score_gpt":0.3588176772054708,"score_spread":0.30096333818372906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W20251927","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048798036,0.0030559956,0.8750755,0.027471935,0.0003556544,0.0011817749,0.00027556234,0.0012509135,0.042534497],"genre_scores_gemma":[0.19926153,0.0018734767,0.79486966,0.0009758073,0.00013044657,0.0005513269,0.00032835026,0.00008363641,0.001925729],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9741374,0.016296187,0.0017342612,0.0016308471,0.0052675074,0.00093386654],"domain_scores_gemma":[0.9816809,0.009773608,0.0017394776,0.0014756328,0.0033248826,0.0020054723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04636785,0.0013845296,0.0017598665,0.0044822763,0.003318705,0.016428355,0.0037162916,0.0028979806,0.0033193124],"category_scores_gemma":[0.020550953,0.0008867106,0.0014043475,0.003973098,0.0065487297,0.011162336,0.008082154,0.0046520885,0.00083432946],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023422186,0.0008141683,0.010687385,0.0017867141,0.00043741756,0.00047988858,0.012316728,0.07877172,0.0045859925,0.35084864,0.014059117,0.52497804],"study_design_scores_gemma":[0.00013204408,0.00071957783,0.00742105,0.0023182957,0.00023325052,0.00038667658,0.020871557,0.11051593,0.0034156418,0.70993996,0.14365935,0.0003867079],"about_ca_topic_score_codex":0.0040178727,"about_ca_topic_score_gemma":0.005415002,"teacher_disagreement_score":0.04636785,"about_ca_system_score_codex":0.007136809,"about_ca_system_score_gemma":0.020015007,"threshold_uncertainty_score":0.24521959},"labels":[],"label_agreement":null},{"id":"W2026358429","doi":"10.1108/02632770010315698","title":"The future of workspace management","year":2000,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":56,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Software deployment; Variety (cybernetics); Workspace; Work (physics); Facility management; Service (business); Process management; Order (exchange); Space (punctuation); Business; Computer science; Core (optical fiber); Knowledge management; Engineering management; Engineering; Marketing; Telecommunications","score_opus":0.003226411343080875,"score_gpt":0.16431108475683945,"score_spread":0.16108467341375857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026358429","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015905984,0.28354746,0.114128985,0.29189655,0.008061648,0.00007336821,0.00036775164,0.0013745402,0.28464377],"genre_scores_gemma":[0.5101652,0.21718422,0.1366715,0.024919363,0.010597157,0.00048714847,0.0009055652,0.0005688034,0.09850112],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99528027,0.002539458,0.00020127193,0.00051627506,0.0009370022,0.00052588264],"domain_scores_gemma":[0.994017,0.002039907,0.0005372748,0.0011537963,0.00088270556,0.0013693923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008169328,0.0005994753,0.0005745378,0.0019975614,0.0032366277,0.017698847,0.0020250818,0.004368513,0.016222555],"category_scores_gemma":[0.0072498415,0.00035018194,0.00057026924,0.0024821751,0.0071469196,0.024067733,0.007350985,0.003506133,0.004467627],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042871423,0.000045581066,0.00059294485,0.00043081108,0.0000145265185,0.000059018694,0.002860335,0.00061812584,0.00034193954,0.6583535,0.04416484,0.2924755],"study_design_scores_gemma":[0.000006109502,0.00003085829,0.00044920802,0.0007241989,0.0000056110152,0.00015693314,0.0028250066,0.00067091244,0.00014526738,0.25856707,0.7363935,0.000025429617],"about_ca_topic_score_codex":0.0018409822,"about_ca_topic_score_gemma":0.0016475588,"teacher_disagreement_score":0.017698847,"about_ca_system_score_codex":0.0032276623,"about_ca_system_score_gemma":0.0059980582,"threshold_uncertainty_score":0.05426991},"labels":[],"label_agreement":null},{"id":"W2026615304","doi":"10.1108/02632770310500310","title":"Facilities – 20th anniversary issue","year":2003,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"","keywords":"Facility management; Engineering; Business; Architectural engineering; Marketing","score_opus":0.009221766953614253,"score_gpt":0.18419242322267984,"score_spread":0.17497065626906558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2026615304","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020326243,0.015638847,0.0026157897,0.03731442,0.67806387,0.00008328611,0.0015072251,0.0012997871,0.26144412],"genre_scores_gemma":[0.007869363,0.009232504,0.0011441286,0.0063562705,0.15258151,0.000052548865,0.0019437668,0.00061947556,0.8202005],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99921644,0.000054631942,0.000058652444,0.00012915918,0.00042340418,0.00011774453],"domain_scores_gemma":[0.9965933,0.00026818705,0.00018549335,0.00021283027,0.0019959386,0.00074428524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013037726,0.0011401452,0.00078312523,0.002404122,0.0017762394,0.005106401,0.0013415208,0.002971537,0.18573363],"category_scores_gemma":[0.00316824,0.00043274823,0.0008282539,0.0012289768,0.0006150338,0.0033170194,0.0023300636,0.0033742497,0.07785051],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023129607,0.000014642702,0.000118875905,0.000084494124,0.0000033344757,0.00009191749,0.000019093586,0.000037769194,0.00020727087,0.0016085682,0.96835506,0.02943584],"study_design_scores_gemma":[0.0000019183549,0.000017023105,0.00030453003,0.000039805174,0.0000023406446,0.00008420786,0.000020007321,0.000016982358,0.000064081025,0.00028798167,0.9991573,0.0000037411244],"about_ca_topic_score_codex":0.0021961168,"about_ca_topic_score_gemma":0.006235509,"teacher_disagreement_score":0.18573363,"about_ca_system_score_codex":0.0010631188,"about_ca_system_score_gemma":0.0011186256,"threshold_uncertainty_score":0.6213409},"labels":[],"label_agreement":null},{"id":"W2027536824","doi":"10.1108/09699980910988384","title":"Data acquisition from construction sites for tracking purposes","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Process (computing); Data acquisition; Identification (biology); Software; Tracking system; Data collection; Radio-frequency identification; Systems engineering; Real-time computing; Engineering; Artificial intelligence","score_opus":0.0157010747044208,"score_gpt":0.22204554246731106,"score_spread":0.20634446776289025,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2027536824","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10226593,0.0006654631,0.8446215,0.00044055938,0.00034250386,0.0019430218,0.0064291935,0.016183237,0.027108677],"genre_scores_gemma":[0.4284813,0.0010156151,0.54521805,0.0002857784,0.00015468177,0.0019657838,0.0076111304,0.00097231445,0.014295306],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99680614,0.00058953546,0.0003115543,0.0006434046,0.0014944127,0.00015499805],"domain_scores_gemma":[0.99299,0.0014703912,0.0008997335,0.001898662,0.0025402328,0.00020093792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020518496,0.00083732815,0.0009034967,0.0036808217,0.00090173795,0.0023159964,0.0013865782,0.00054797105,0.008059498],"category_scores_gemma":[0.0063950187,0.00045757668,0.0004153756,0.0038857185,0.00046279412,0.0016796667,0.0014327051,0.0006466962,0.0051775584],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005814134,0.00028650012,0.029901324,0.00091776997,0.00007322482,0.00035393663,0.0014604378,0.011444522,0.06415765,0.0043055685,0.015749544,0.8707681],"study_design_scores_gemma":[0.0003058701,0.0014869648,0.1397513,0.0013811076,0.00034559713,0.0021310719,0.003406075,0.14420593,0.3961462,0.008400242,0.3018563,0.00058337627],"about_ca_topic_score_codex":0.0048387605,"about_ca_topic_score_gemma":0.0032971387,"teacher_disagreement_score":0.008059498,"about_ca_system_score_codex":0.00058845594,"about_ca_system_score_gemma":0.002079282,"threshold_uncertainty_score":0.026961744},"labels":[],"label_agreement":null},{"id":"W2028972000","doi":"10.9753/icce.v33.management.30","title":"COASTAL ENGINEERING EDUCATION AND COASTAL MODELS","year":2012,"lang":"en","type":"article","venue":"Coastal Engineering Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Coastal engineering; Coastal management; Order (exchange); Oceanography; Environmental resource management; Computer science; Engineering; Environmental science; Geology; Business","score_opus":0.007127495352082786,"score_gpt":0.18523064895516142,"score_spread":0.17810315360307863,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2028972000","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0387631,0.011168707,0.0533386,0.05406294,0.0010197586,0.000019616175,0.000081842794,0.0001802219,0.8413653],"genre_scores_gemma":[0.86481464,0.015205328,0.018652238,0.0038009568,0.00040633144,0.00004043196,0.00010857107,0.00011653554,0.096855044],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99905187,0.00045946077,0.000034111792,0.00007878579,0.00027182873,0.000104012914],"domain_scores_gemma":[0.9981645,0.0009961786,0.00016964601,0.00016163808,0.00030840858,0.00019962151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001081193,0.0003379902,0.0002174457,0.00063449604,0.0012867354,0.00390568,0.00045517727,0.0013196486,0.011573522],"category_scores_gemma":[0.0041564824,0.00016685057,0.00023133565,0.0010968753,0.004936912,0.0042437306,0.0034331735,0.001998204,0.0014670765],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010998047,0.00007869938,0.0015812938,0.00014374992,0.000006071446,0.00018767164,0.0028464834,0.0027400076,0.00025626805,0.8818387,0.013052562,0.09725751],"study_design_scores_gemma":[0.000008815408,0.00005117192,0.0030424024,0.0007122465,0.0000099373065,0.00049366534,0.008235379,0.004106162,0.0006148421,0.53154397,0.45114365,0.000037740014],"about_ca_topic_score_codex":0.00525641,"about_ca_topic_score_gemma":0.009071456,"teacher_disagreement_score":0.011573522,"about_ca_system_score_codex":0.0016212658,"about_ca_system_score_gemma":0.0021757125,"threshold_uncertainty_score":0.03871727},"labels":[],"label_agreement":null},{"id":"W2029178229","doi":"10.1108/09699980410558575","title":"Innovative 3D‐modelling for selecting and locating mobile cranes","year":2004,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Concordia University","funders":"","keywords":"Lift (data mining); Animation; Computer science; Selection (genetic algorithm); Graphics; Industrial engineering; Engineering; Systems engineering; Data mining; Artificial intelligence; Computer graphics (images)","score_opus":0.005183567148387535,"score_gpt":0.18664152059786188,"score_spread":0.18145795344947435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2029178229","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004401433,0.000055862096,0.9917923,0.000031214255,0.000013247461,0.00005281382,0.00018330719,0.0016641865,0.0018057253],"genre_scores_gemma":[0.09685624,0.00034639722,0.8984164,0.000031092168,0.000009671391,0.00023371045,0.00067565957,0.00028169606,0.0031491227],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995435,0.00009783668,0.000031389158,0.000072680676,0.0002284868,0.00002607427],"domain_scores_gemma":[0.99971217,0.00009611047,0.000023364535,0.000087562585,0.00006314365,0.000017572745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048732196,0.00077194953,0.0007509302,0.0014610953,0.0005170078,0.0014891246,0.0014267246,0.0009898291,0.006176747],"category_scores_gemma":[0.0010079171,0.0007540585,0.001012341,0.0012514365,0.0005168252,0.000993493,0.0013626323,0.0005983331,0.001979813],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019556173,0.00010327614,0.0036614935,0.0006701455,0.0001066541,0.00042247493,0.0011218609,0.42901877,0.058419034,0.034173153,0.0066352985,0.46547237],"study_design_scores_gemma":[0.00003647968,0.00004775481,0.00097593374,0.000075029624,0.00004729654,0.00033097313,0.00013055469,0.92683524,0.020228565,0.004158117,0.047070142,0.000063816085],"about_ca_topic_score_codex":0.0046192682,"about_ca_topic_score_gemma":0.007216549,"teacher_disagreement_score":0.006176747,"about_ca_system_score_codex":0.0004759761,"about_ca_system_score_gemma":0.00095300627,"threshold_uncertainty_score":0.020663261},"labels":[],"label_agreement":null},{"id":"W2030212035","doi":"10.1016/j.autcon.2012.12.004","title":"Building Information Modeling (BIM) partnering framework for public construction projects","year":2013,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":473,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Department for Business, Innovation and Skills","keywords":"Building information modeling; Procurement; Rework; Construction industry; Integrated project delivery; Construction management; Productivity; Competition (biology); Pre-construction services; Process management; Project management; Business; Construction engineering; Engineering; Operations management; Project planning; Systems engineering; Marketing; Civil engineering","score_opus":0.022112080141336317,"score_gpt":0.24119654176182134,"score_spread":0.21908446162048503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2030212035","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007859994,0.00029487262,0.96347725,0.00046333048,0.000051369952,0.00022483806,0.0017728484,0.0077572907,0.018098189],"genre_scores_gemma":[0.20593457,0.0008312642,0.77828246,0.00015234642,0.000029673562,0.0006103922,0.007839849,0.0007904084,0.005528992],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975407,0.00074785156,0.00021277615,0.00022545578,0.0010248274,0.0002484779],"domain_scores_gemma":[0.9991573,0.00015701674,0.00008506019,0.0002710376,0.00023435194,0.00009514531],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032515484,0.00084655645,0.0009214683,0.0029345723,0.0012902447,0.0039547365,0.0024363562,0.0014478099,0.0049781017],"category_scores_gemma":[0.0031728563,0.0005375107,0.0011994763,0.004004435,0.000697337,0.0033503168,0.00444438,0.0013818877,0.0017312322],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011233111,0.00032517896,0.0028305408,0.00042669618,0.000106413216,0.00047427983,0.0014072699,0.15994,0.0043093143,0.5074927,0.03112186,0.29145327],"study_design_scores_gemma":[0.00004879287,0.00008921927,0.0019497088,0.00038583358,0.00013087584,0.00048412054,0.001162845,0.49216905,0.009067044,0.20750147,0.28688827,0.00012270879],"about_ca_topic_score_codex":0.0126655465,"about_ca_topic_score_gemma":0.018366255,"teacher_disagreement_score":0.0126655465,"about_ca_system_score_codex":0.0015424847,"about_ca_system_score_gemma":0.004166812,"threshold_uncertainty_score":0.025183618},"labels":[],"label_agreement":null},{"id":"W2031303073","doi":"10.1089/ees.2010.2707","title":"<i>Selected Proceedings from IT3:</i> The International Conference on Thermal Treatment Technologies &amp; Hazardous Waste Combustors, Montreal, Canada, May 12–16, 2008, and Cincinnati, Ohio, May 12–22, 2009 <i>Guest Editor: Paul M. Lemieux, Ph.D.</i> Introduction","year":2010,"lang":"en","type":"article","venue":"Environmental Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Hazardous waste; Library science; Download; Waste management; Engineering; Environmental science; Computer science","score_opus":0.0038244221099251793,"score_gpt":0.16144252567066747,"score_spread":0.1576181035607423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2031303073","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017698868,0.049313862,0.0114690475,0.058956325,0.3895086,0.00023796917,0.0025360489,0.0011289509,0.4850793],"genre_scores_gemma":[0.007855318,0.031790804,0.0023111117,0.008209578,0.08301385,0.00007920292,0.0017354161,0.00073054904,0.86427426],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994991,0.00004727633,0.000035267603,0.00005257765,0.00032118516,0.00004460016],"domain_scores_gemma":[0.99777263,0.0004201646,0.000110829715,0.00007843774,0.0013640476,0.00025384763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010268047,0.00087520917,0.00058517035,0.0019230593,0.00097485335,0.0027347682,0.0009178192,0.0014373959,0.12480651],"category_scores_gemma":[0.0020489157,0.00024256887,0.0005497194,0.0020804736,0.00040397263,0.0012933107,0.00085500855,0.0017747892,0.055242844],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011906387,0.000007751949,0.00006441666,0.000074362564,0.0000017228698,0.000033700566,0.000013551848,0.000059857168,0.00027944357,0.0003371408,0.97824425,0.020871937],"study_design_scores_gemma":[0.0000033890585,0.000015455858,0.00043016367,0.00008060182,0.000003879613,0.000082745544,0.000035206114,0.000082317296,0.00043176636,0.00024023638,0.99858665,0.0000075335392],"about_ca_topic_score_codex":0.004654381,"about_ca_topic_score_gemma":0.018291088,"teacher_disagreement_score":0.9953456,"about_ca_system_score_codex":0.0009556714,"about_ca_system_score_gemma":0.0013272674,"threshold_uncertainty_score":0.4175194},"labels":[],"label_agreement":null},{"id":"W2032593626","doi":"10.1109/simul.2010.36","title":"Simulation-Based Scheduling of Modular Construction Using Multi-agent Resource Allocation","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; PCL Construction (Canada)","funders":"","keywords":"Computer science; Modular design; Scheduling (production processes); Distributed computing; Processor scheduling; Resource allocation; Resource (disambiguation); Computer network; Engineering; Operating system; Operations management","score_opus":0.018094440133185306,"score_gpt":0.24313558914500336,"score_spread":0.22504114901181804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032593626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19750288,0.0002087764,0.7875501,0.00031109582,0.000094687864,0.00030235166,0.00018639218,0.0008884237,0.012955294],"genre_scores_gemma":[0.91772115,0.00013343901,0.07928932,0.000033176086,0.00001132459,0.00025307064,0.0001432512,0.00003839285,0.0023768425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956185,0.0001985986,0.000021391614,0.000055637272,0.00008842899,0.00007407433],"domain_scores_gemma":[0.9987741,0.00075973803,0.00013884055,0.00006895342,0.00012689384,0.00013139057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009816838,0.0006875992,0.0007836967,0.00052683474,0.0006211196,0.0008604693,0.0010772902,0.0007789959,0.0023390406],"category_scores_gemma":[0.0015113889,0.0004451469,0.00071723986,0.0005041468,0.0006214846,0.00058052427,0.00088710483,0.0006634602,0.00019683993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023263874,0.000017024744,0.00017535752,0.0000059773984,0.0000061085484,0.000015006957,0.000009900583,0.9970669,0.00022921174,0.0010872259,0.000049368453,0.0013145771],"study_design_scores_gemma":[0.000005403188,0.000007997237,0.000028923043,6.8703326e-7,0.0000015359029,0.0000014167534,0.0000032891724,0.99948287,0.00008565717,0.00026279097,0.00011818706,0.0000012199698],"about_ca_topic_score_codex":0.0139223505,"about_ca_topic_score_gemma":0.012968573,"teacher_disagreement_score":0.0139223505,"about_ca_system_score_codex":0.0012943378,"about_ca_system_score_gemma":0.0021178296,"threshold_uncertainty_score":0.027682662},"labels":[],"label_agreement":null},{"id":"W2032824002","doi":"10.4018/ij3dim.2014100104","title":"Using Building Information Modeling to Evaluate the Costs and Benefits of Adopting Sustainable Universal Houses in Canada","year":2014,"lang":"en","type":"article","venue":"International Journal of 3-D Information Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Sustainability; Building information modeling; Risk analysis (engineering); Computer science; Process (computing); Compatibility (geochemistry); Universal design; Population; Construction engineering; Systems engineering; Architectural engineering; Engineering; Business","score_opus":0.013949376779782368,"score_gpt":0.22422587031050625,"score_spread":0.2102764935307239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2032824002","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96974325,0.00031095027,0.0028313922,0.0005677046,0.000011127519,0.00020516268,0.0020420162,0.000078367586,0.024210077],"genre_scores_gemma":[0.9907418,0.00025865418,0.0058249305,0.000021759968,0.0000011456635,0.00004242725,0.00076880463,0.000012667518,0.0023276967],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.997497,0.00039976125,0.00008451432,0.000141301,0.0013402104,0.0005371194],"domain_scores_gemma":[0.99704784,0.0004991277,0.00024690584,0.00012969854,0.0017412243,0.00033518564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001867014,0.00054903526,0.00044398234,0.0025411353,0.003210419,0.0032906174,0.0012819989,0.00050278776,0.0023055146],"category_scores_gemma":[0.006539519,0.00031808202,0.000772787,0.0061158324,0.0009128142,0.0010536385,0.0014393651,0.0005409502,0.00014445506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00089712813,0.00083946425,0.5861353,0.0004088948,0.0003561281,0.0007736332,0.004589204,0.18765698,0.0025624905,0.030372191,0.0077213775,0.1776872],"study_design_scores_gemma":[0.00007687759,0.0004066642,0.55102307,0.0002031099,0.00040655464,0.0001732417,0.01691269,0.40216613,0.004371842,0.0039237966,0.020125797,0.00021017795],"about_ca_topic_score_codex":0.99295115,"about_ca_topic_score_gemma":0.9963799,"teacher_disagreement_score":0.11326868,"about_ca_system_score_codex":0.11326868,"about_ca_system_score_gemma":0.06443313,"threshold_uncertainty_score":0.8218256},"labels":[],"label_agreement":null},{"id":"W2034099894","doi":"10.1145/1094855.1094872","title":"Agile environments...","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Professional Engineers Ontario","funders":"","keywords":"Agile software development; Work (physics); Culture change; Organizational culture; Business; Restructuring; Sample (material); Engineering; Engineering management; Operations management; Computer science; Knowledge management; Process management; Management; Software engineering; Finance; Sociology","score_opus":0.004107342676813589,"score_gpt":0.16599578985404737,"score_spread":0.16188844717723377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034099894","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040729875,0.002900569,0.030692985,0.031124983,0.0055439235,0.00020762501,0.00057007134,0.0031317736,0.9217551],"genre_scores_gemma":[0.051304817,0.0037015772,0.0294534,0.015728928,0.00078377145,0.00031973558,0.0005988748,0.0014915734,0.8966173],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989085,0.0004116913,0.00004073144,0.00009040924,0.0003771369,0.00017150523],"domain_scores_gemma":[0.9988444,0.00022981118,0.00007753846,0.00017689906,0.00026053537,0.00041078363],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001414273,0.0005415528,0.00015196302,0.0004115306,0.0021292262,0.004107342,0.0005833652,0.0011176969,0.09422307],"category_scores_gemma":[0.0027859597,0.0002937238,0.00030353921,0.00043097738,0.00089444005,0.00339207,0.0038466144,0.0026330336,0.049272828],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018514866,0.00004312289,0.0005644939,0.00012929745,0.000006961043,0.00017488321,0.0058795502,0.0001087176,0.0008285676,0.04863058,0.74507415,0.19854136],"study_design_scores_gemma":[0.0000026028547,0.000007606449,0.00016280577,0.000037546524,8.508073e-7,0.00009316911,0.00062475546,0.000033578835,0.000060330993,0.0014992559,0.9974734,0.0000041081366],"about_ca_topic_score_codex":0.0019466283,"about_ca_topic_score_gemma":0.005272881,"teacher_disagreement_score":0.9057769,"about_ca_system_score_codex":0.00043996033,"about_ca_system_score_gemma":0.0011023601,"threshold_uncertainty_score":0.31520754},"labels":[],"label_agreement":null},{"id":"W2034659495","doi":"10.1108/ecam-02-2012-0015","title":"A case productivity model for automatic climbing system","year":2014,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SNC-Lavalin (Canada); Concordia University","funders":"","keywords":"Productivity; Formwork; Bottleneck; Originality; Engineering; Scheduling (production processes); Benchmarking; Futures studies; Industrial engineering; Computer science; Operations research; Operations management; Civil engineering; Artificial intelligence; Business","score_opus":0.006901710517178255,"score_gpt":0.1804127465982569,"score_spread":0.17351103608107865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2034659495","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30231965,0.0006180709,0.56695837,0.0014559533,0.00017478205,0.0007115768,0.0031957163,0.0011760421,0.12338981],"genre_scores_gemma":[0.9460102,0.00033683275,0.027491095,0.000045531564,0.000027341965,0.00054715184,0.0009872651,0.00006930814,0.024485348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992493,0.00018835657,0.000043396107,0.00016350366,0.00019555952,0.00015990296],"domain_scores_gemma":[0.99861014,0.00063291565,0.00019589048,0.00005621345,0.00043310426,0.00007166507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011466302,0.0010061599,0.00046044655,0.0016214957,0.0007572774,0.0021671392,0.0016244936,0.0014610202,0.013796643],"category_scores_gemma":[0.0032791095,0.00043007042,0.0010439561,0.0011813286,0.0005377126,0.0012995185,0.0009173034,0.0010914094,0.0014220915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005521288,0.00009986641,0.0027394036,0.00008938591,0.00001476326,0.0003385717,0.00016638584,0.96970886,0.00074462796,0.0143420575,0.0013137725,0.010387029],"study_design_scores_gemma":[0.000009272715,0.000025769286,0.0005968245,0.000014612506,0.000010262139,0.000033603585,0.00007647372,0.99585056,0.00018881669,0.0017851286,0.0014009844,0.000007739247],"about_ca_topic_score_codex":0.03431347,"about_ca_topic_score_gemma":0.017903615,"teacher_disagreement_score":0.03431347,"about_ca_system_score_codex":0.0032065911,"about_ca_system_score_gemma":0.0020024306,"threshold_uncertainty_score":0.06822747},"labels":[],"label_agreement":null},{"id":"W2035798461","doi":"10.5555/2429759.2430169","title":"Integrating discrete event simulation (DES) and system dynamics (SD) on single platform for simulating construction operations","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Discrete event simulation; Computer science; Context (archaeology); Interfacing; System dynamics; Industrial engineering; Simulation modeling; Synchronization (alternating current); Operations research; Event (particle physics); Systems engineering; Simulation; Engineering; Artificial intelligence","score_opus":0.02973839544439359,"score_gpt":0.2682123121038019,"score_spread":0.23847391665940834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2035798461","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050179914,0.00008076418,0.9380746,0.00012232838,0.00006384836,0.0002560705,0.00017786081,0.00197913,0.0090656215],"genre_scores_gemma":[0.59118074,0.00029890225,0.40283045,0.000057537993,0.000024135123,0.00044389718,0.0004297091,0.00017181324,0.004562839],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945813,0.00016728578,0.000051898045,0.00009755712,0.00017533908,0.000049691105],"domain_scores_gemma":[0.99931395,0.00031715722,0.00006646074,0.0001284148,0.000108978515,0.00006505462],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010027407,0.0007558164,0.00061369146,0.0007021761,0.0004448417,0.0011982636,0.001059595,0.0007250161,0.0034822412],"category_scores_gemma":[0.001869099,0.0004327346,0.0010964167,0.00046275635,0.00053490774,0.0014180623,0.002090971,0.0010943073,0.00054815365],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000116996045,0.0001102244,0.003187974,0.00008781689,0.00006311162,0.00014226981,0.00019860592,0.9410801,0.0051848744,0.019555908,0.0004573801,0.029814752],"study_design_scores_gemma":[0.000010542526,0.00004013655,0.00019553857,0.000009870634,0.000015023242,0.000018226174,0.000029076107,0.9920866,0.0017897827,0.0028699923,0.0029247927,0.000010386951],"about_ca_topic_score_codex":0.006380087,"about_ca_topic_score_gemma":0.005359876,"teacher_disagreement_score":0.006380087,"about_ca_system_score_codex":0.0007243103,"about_ca_system_score_gemma":0.0015476024,"threshold_uncertainty_score":0.012685895},"labels":[],"label_agreement":null},{"id":"W2036087515","doi":"10.1108/14630010210811840","title":"Strategic facility management and technology: The case study of the University of Calgary","year":2002,"lang":"en","type":"article","venue":"Journal of Corporate Real Estate","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Alberta Energy","funders":"","keywords":"Facility management; Business; Strategic planning; Order (exchange); Engineering management; University campus; Process management; Operations management; Marketing; Finance; Computer science; Engineering; Library science","score_opus":0.025296048185912027,"score_gpt":0.18716332774159958,"score_spread":0.16186727955568755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036087515","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9729969,0.00051068724,0.0013042922,0.0026965318,0.000026175367,0.0001207505,0.00005779121,0.000028737542,0.02225805],"genre_scores_gemma":[0.99092454,0.0006238846,0.0013429633,0.00035575448,0.0000096429185,0.000028467128,0.00004403583,0.000018221708,0.006652517],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9972933,0.0010196457,0.000047238176,0.00013522978,0.0004350774,0.0010695348],"domain_scores_gemma":[0.99793184,0.0006676773,0.0001923237,0.000088025845,0.00027064834,0.00084948615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015820294,0.00041962872,0.00037545597,0.0014363861,0.014584854,0.004665353,0.0024477094,0.0037680315,0.004735931],"category_scores_gemma":[0.00372815,0.00043995175,0.00031593197,0.0038992965,0.0051767505,0.001783887,0.004250952,0.0025561566,0.0005698167],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004932134,0.0027140067,0.11608881,0.0006696731,0.00012481125,0.09769041,0.5227109,0.016198618,0.004882392,0.056265783,0.025108557,0.15705287],"study_design_scores_gemma":[0.0000644218,0.0005857089,0.0481892,0.00029072343,0.000039568033,0.0048260447,0.86315656,0.004202987,0.0013127185,0.0021767558,0.07507423,0.00008106284],"about_ca_topic_score_codex":0.41138688,"about_ca_topic_score_gemma":0.6941217,"teacher_disagreement_score":0.41138688,"about_ca_system_score_codex":0.017378628,"about_ca_system_score_gemma":0.013136086,"threshold_uncertainty_score":0.8179847},"labels":[],"label_agreement":null},{"id":"W2036178893","doi":"10.1061/(asce)0733-9364(2001)127:4(330)","title":"Improving Design Coordination for Building Projects. II: A Collaborative System","year":2001,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science; Process (computing); The Internet; Domain (mathematical analysis); Collaborative design; Information sharing; Building information modeling; Design technology; Systems design; Systems engineering; Engineering management; Knowledge management; Software engineering; World Wide Web; Engineering","score_opus":0.006750662511390033,"score_gpt":0.19213729165913487,"score_spread":0.18538662914774484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2036178893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050903365,0.00028342532,0.920798,0.0005622442,0.000115399904,0.0010471847,0.00020318064,0.0131981,0.012889053],"genre_scores_gemma":[0.21466082,0.0002251718,0.7761601,0.00010339837,0.00004320475,0.0007905842,0.00075153966,0.000424639,0.006840527],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99370813,0.0022819967,0.00057218905,0.001392665,0.0016443606,0.00040063562],"domain_scores_gemma":[0.99346256,0.001808881,0.0007172431,0.0022028454,0.0010511739,0.0007573336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0077027837,0.001112857,0.0010173963,0.00252744,0.0023859285,0.005113009,0.0021460555,0.0018743469,0.005620021],"category_scores_gemma":[0.015548933,0.000967875,0.0007676233,0.0024750484,0.0010251934,0.0042355736,0.0058366503,0.0011218196,0.0019457752],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067345955,0.0014734707,0.006402096,0.00051836506,0.00012280868,0.00035476813,0.0052564032,0.05357281,0.025509037,0.021370573,0.017567052,0.86717933],"study_design_scores_gemma":[0.0013180838,0.002852958,0.011854783,0.00048262687,0.00054814754,0.0011670707,0.0038278033,0.6595561,0.07034935,0.03244726,0.21522687,0.00036886215],"about_ca_topic_score_codex":0.003963697,"about_ca_topic_score_gemma":0.0030995465,"teacher_disagreement_score":0.0077027837,"about_ca_system_score_codex":0.0015863156,"about_ca_system_score_gemma":0.0047870157,"threshold_uncertainty_score":0.040736675},"labels":[],"label_agreement":null},{"id":"W2037640517","doi":"10.1061/41109(373)5","title":"Automated Materials Tracking and Locating: Impact Modeling and Estimation","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Global Positioning System; Computer science; Schedule; Supply chain; Software; Tracking system; Automation; Productivity; Track (disk drive); Systems engineering; Field (mathematics); Tracking (education); Yard; Visibility; Software engineering; Real-time computing; Engineering; Kalman filter; Artificial intelligence; Telecommunications","score_opus":0.009000092575239418,"score_gpt":0.24431604165257725,"score_spread":0.23531594907733783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2037640517","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80342317,0.00020528787,0.18808454,0.0001867961,0.000017349046,0.00030848352,0.00042743093,0.00049793435,0.0068490044],"genre_scores_gemma":[0.97506046,0.00014831059,0.023016037,0.000013238383,0.000005013743,0.00019290733,0.00016962236,0.000024376901,0.0013701237],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993406,0.00021727331,0.00003598919,0.00008563199,0.00024776973,0.00007271708],"domain_scores_gemma":[0.9962807,0.0027183185,0.0003494605,0.00021906523,0.00039172257,0.00004078329],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019273381,0.0008675969,0.0007585157,0.0012166081,0.0005868456,0.00091559155,0.0016545895,0.0016466249,0.0017636963],"category_scores_gemma":[0.0040388717,0.00083430484,0.0006358514,0.0014204362,0.0006166377,0.0017062227,0.00068712555,0.0007355199,0.0002972783],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006394711,0.000096930555,0.003998048,0.00003679265,0.000014670922,0.000024021369,0.000044824443,0.9853864,0.0005190662,0.000610488,0.00010493653,0.009099876],"study_design_scores_gemma":[0.0000068166187,0.000061996194,0.0012653176,0.0000028179359,0.000009596495,0.000009842497,0.000025721703,0.99775463,0.00047371598,0.00027342266,0.00011060841,0.0000054853626],"about_ca_topic_score_codex":0.032369602,"about_ca_topic_score_gemma":0.021132788,"teacher_disagreement_score":0.032369602,"about_ca_system_score_codex":0.0017638325,"about_ca_system_score_gemma":0.0010385247,"threshold_uncertainty_score":0.06436241},"labels":[],"label_agreement":null},{"id":"W2038212705","doi":"10.1061/40937(261)35","title":"Sensitivity Analysis of Construction Simulation Considering Site Layout Patterns","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"DEVS; Sensitivity (control systems); Computer science; Animation; Simulation modeling; Discrete event simulation; Modeling and simulation; Simulation; Data mining; Engineering; Computer graphics (images); Electronic engineering","score_opus":0.01034676925464319,"score_gpt":0.23098678072830184,"score_spread":0.22064001147365864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038212705","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61117566,0.00020989084,0.37288398,0.0003041235,0.000055392953,0.00014086634,0.00038072438,0.00046112243,0.014388342],"genre_scores_gemma":[0.98896307,0.0000623709,0.010332553,0.000019091603,0.0000040676982,0.000046603338,0.00009590175,0.000031576703,0.00044471383],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99864024,0.0006938073,0.00005110146,0.00011588515,0.0003426684,0.00015631811],"domain_scores_gemma":[0.9913549,0.007424291,0.0003012399,0.00038590288,0.00043913577,0.000094568124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002075328,0.00063131895,0.00072369695,0.00095511106,0.00040692982,0.0007835493,0.0005536629,0.00075625227,0.0015023893],"category_scores_gemma":[0.008362538,0.000453338,0.0008013261,0.00069676066,0.0006515566,0.0006460198,0.0009145182,0.00062860607,0.00010472438],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018625271,0.000007389611,0.0007345437,0.000008829012,0.000010536322,0.0000228738,0.000011298964,0.99652135,0.0005721025,0.0008304838,0.00002799709,0.0012340256],"study_design_scores_gemma":[0.0000021607464,0.000011285175,0.00028046186,0.0000018912589,0.00000522881,0.000007873816,0.000009215321,0.998175,0.0009118164,0.0004757078,0.000114791415,0.00000450139],"about_ca_topic_score_codex":0.008070332,"about_ca_topic_score_gemma":0.002708928,"teacher_disagreement_score":0.008070332,"about_ca_system_score_codex":0.0012041981,"about_ca_system_score_gemma":0.00062343286,"threshold_uncertainty_score":0.016046703},"labels":[],"label_agreement":null},{"id":"W2038591776","doi":"10.1016/j.asej.2014.09.006","title":"Reducing the operational energy demand in buildings using building information modeling tools and sustainability approaches","year":2014,"lang":"en","type":"article","venue":"Ain Shams Engineering Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":147,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Sustainability; Building information modeling; Architectural engineering; Energy consumption; Energy demand; Engineering; Efficient energy use; Sustainable design; Energy analysis; Energy modeling; Architecture; Energy (signal processing); Environmental economics; Civil engineering; Operations management","score_opus":0.013488662266586357,"score_gpt":0.19523871004702306,"score_spread":0.1817500477804367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038591776","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27160716,0.0023433194,0.6459589,0.0024141308,0.00010315267,0.00030658353,0.0009933865,0.0015136808,0.074759774],"genre_scores_gemma":[0.7331412,0.0020177248,0.2599284,0.00009954955,0.000016164597,0.00018686877,0.0008089744,0.00012733212,0.0036737986],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992411,0.00023774047,0.000037085305,0.00004676109,0.000377796,0.00005952406],"domain_scores_gemma":[0.9995296,0.00022092446,0.000055894096,0.000054817665,0.00011928532,0.000019509504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008521545,0.0007762948,0.00040662597,0.0020195665,0.00052059913,0.0025454017,0.00083862286,0.00068578374,0.0017770672],"category_scores_gemma":[0.0013847861,0.00044576434,0.0006583786,0.0024700593,0.00043570844,0.0034763338,0.0014269929,0.0005959814,0.00036874463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115456736,0.00044839177,0.0068915915,0.0006575905,0.00008889642,0.00031952164,0.0007542617,0.638662,0.016593212,0.06240738,0.0027036923,0.270358],"study_design_scores_gemma":[0.000018694109,0.00011711274,0.0036412124,0.00018990718,0.00008576023,0.00013850989,0.0014662691,0.92836624,0.014405607,0.029100396,0.022392573,0.0000776553],"about_ca_topic_score_codex":0.0048553525,"about_ca_topic_score_gemma":0.01081474,"teacher_disagreement_score":0.0048553525,"about_ca_system_score_codex":0.0012986541,"about_ca_system_score_gemma":0.0014927925,"threshold_uncertainty_score":0.009654224},"labels":[],"label_agreement":null},{"id":"W2038899743","doi":"10.1108/14714170410815024","title":"Survey of information technology applications in construction","year":2004,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Key (lock); Computer science; Data science; Engineering management; Systems engineering; Knowledge management; Engineering; Computer security","score_opus":0.00838549975092018,"score_gpt":0.2136044261473876,"score_spread":0.2052189263964674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2038899743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5821495,0.33702353,0.010434145,0.005792862,0.00034213514,0.00023465746,0.0020618488,0.00020877812,0.061752573],"genre_scores_gemma":[0.6083688,0.37155542,0.009500406,0.0011702338,0.0003137896,0.00017638988,0.0024289745,0.000066601075,0.006419364],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99053556,0.0027163117,0.0016527354,0.00045650615,0.0042689145,0.00036996594],"domain_scores_gemma":[0.9354013,0.046181772,0.0044865673,0.0016833745,0.0114879785,0.00075898756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073127057,0.00028494906,0.00056948623,0.017212195,0.0006455933,0.0024864103,0.00058298005,0.0007687653,0.002999866],"category_scores_gemma":[0.02329762,0.0003206921,0.00048117916,0.04367841,0.0007839466,0.0039508543,0.00096800126,0.00058255927,0.00084609195],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016064297,0.00018203026,0.10655609,0.0073004668,0.00012166463,0.00037249335,0.0062061218,0.0007898533,0.0020719224,0.0052093463,0.012591744,0.85843766],"study_design_scores_gemma":[0.000016750098,0.0007950085,0.60017955,0.0064331978,0.00031499768,0.0041143512,0.016783006,0.0016643192,0.0052383365,0.0022806185,0.36208144,0.00009845791],"about_ca_topic_score_codex":0.0019252634,"about_ca_topic_score_gemma":0.0035585824,"teacher_disagreement_score":0.017212195,"about_ca_system_score_codex":0.0011055124,"about_ca_system_score_gemma":0.002153159,"threshold_uncertainty_score":0.0386737},"labels":[],"label_agreement":null},{"id":"W2041525256","doi":"10.1139/l03-006","title":"Constraint-based genetic algorithm for earthmoving fleet selection","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Tournament selection; Crossover; Genetic algorithm; Computer science; Normalization (sociology); Selection (genetic algorithm); Fitness proportionate selection; Algorithm; Roulette; Ranking (information retrieval); Context (archaeology); Chromosome; Mathematical optimization; Fitness function; Artificial intelligence; Machine learning; Mathematics","score_opus":0.005276082128401014,"score_gpt":0.16784105657834475,"score_spread":0.16256497444994372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2041525256","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010792208,0.00012445684,0.9858436,0.00007996717,0.000019013241,0.00006480109,0.00004626247,0.00024264665,0.0027870017],"genre_scores_gemma":[0.27069846,0.00034827937,0.72412705,0.00010506003,0.000028394668,0.00060508086,0.00032476446,0.00010396932,0.0036589648],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996351,0.00014481293,0.000015522586,0.000057929734,0.000111246256,0.00003539435],"domain_scores_gemma":[0.9994271,0.00037559855,0.000038359638,0.000023903305,0.00011787362,0.000017269824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076325197,0.00078397576,0.00087011576,0.0010306058,0.0005514194,0.00071327377,0.0012048268,0.0010399425,0.0022032568],"category_scores_gemma":[0.002201115,0.00028646164,0.0005360602,0.0012283238,0.00055101037,0.0005191866,0.0005393483,0.000726948,0.00037145606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002147311,0.000020245627,0.00030054752,0.000022974118,0.000019138453,0.000036900678,0.00003343617,0.957341,0.00063179014,0.008429821,0.000604468,0.032538135],"study_design_scores_gemma":[0.000011109119,0.000010045569,0.000048343976,0.000004097791,0.0000045322995,0.000011526181,0.0000041278317,0.9974705,0.00024401821,0.001591386,0.0005966173,0.0000037312127],"about_ca_topic_score_codex":0.010638258,"about_ca_topic_score_gemma":0.0064199036,"teacher_disagreement_score":0.010638258,"about_ca_system_score_codex":0.0010480983,"about_ca_system_score_gemma":0.001512455,"threshold_uncertainty_score":0.021152675},"labels":[],"label_agreement":null},{"id":"W2042378286","doi":"10.1109/simul.2010.15","title":"Integrated Simulation-Based Look-Ahead Scheduling for Steel Fabrication Projects","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Doors; Computer science; Systems engineering; Architecture; Industrial engineering; Dynamic priority scheduling; Distributed computing; Engineering; Manufacturing engineering","score_opus":0.018092592152540766,"score_gpt":0.2486628561256225,"score_spread":0.23057026397308172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2042378286","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20113564,0.00019803182,0.78800493,0.00025483724,0.00007089246,0.00017883965,0.00021364169,0.0055374713,0.0044057867],"genre_scores_gemma":[0.9153679,0.00008534664,0.08333247,0.00002047163,0.000007825527,0.000095038784,0.00019929315,0.00006227899,0.0008293981],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995524,0.00016117845,0.000031295614,0.00008414361,0.00010941727,0.000061478175],"domain_scores_gemma":[0.99938166,0.000220661,0.000075256765,0.00008158067,0.0001253284,0.00011544792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010706894,0.0005421475,0.00072789466,0.00049863,0.0005936889,0.0008979573,0.0010182163,0.00047983666,0.0016407742],"category_scores_gemma":[0.0013750507,0.00046598067,0.00038071457,0.0004569534,0.0003576499,0.00068120874,0.00073003396,0.0005387384,0.00023938084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028161003,0.00009013828,0.0016052321,0.000021672005,0.000028199363,0.000045182733,0.00007625164,0.9702279,0.003858168,0.0014895549,0.00051143894,0.021764634],"study_design_scores_gemma":[0.000015706408,0.000021304299,0.00016446656,0.0000015181814,0.0000059906597,0.00000452853,0.000008897823,0.9982293,0.0008722205,0.0003238914,0.00034669114,0.0000055133623],"about_ca_topic_score_codex":0.014534036,"about_ca_topic_score_gemma":0.013940424,"teacher_disagreement_score":0.014534036,"about_ca_system_score_codex":0.0009996716,"about_ca_system_score_gemma":0.0022674343,"threshold_uncertainty_score":0.028898835},"labels":[],"label_agreement":null},{"id":"W2043222413","doi":"10.1061/(asce)0733-9364(2008)134:8(653)","title":"New Mathematical Optimization Model for Construction Site Layout","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":77,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Adjacency list; Object (grammar); Process (computing); Function (biology); Visibility; Genetic algorithm; Orientation (vector space); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics; Machine learning","score_opus":0.00806788335009506,"score_gpt":0.18390310381856115,"score_spread":0.17583522046846609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043222413","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016970821,0.00055293686,0.9843513,0.00037892343,0.00008165664,0.0000374529,0.00017632957,0.00010550599,0.012618796],"genre_scores_gemma":[0.33628607,0.0053766267,0.58378327,0.00055208075,0.00040900274,0.0012832908,0.001205542,0.00037230694,0.070731744],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918073,0.0002438624,0.000041058014,0.0001643079,0.00028753123,0.00008248088],"domain_scores_gemma":[0.9994129,0.00030693263,0.00007781133,0.00003299198,0.00014595399,0.000023445267],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001359408,0.0014390224,0.0013083895,0.0012885899,0.00066140713,0.002381885,0.0022751107,0.002166364,0.0072300253],"category_scores_gemma":[0.002361817,0.00082525914,0.001644704,0.0020747574,0.0012497999,0.002542031,0.0012515063,0.0020794037,0.0018682273],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011353889,0.000019359903,0.000112823756,0.00008421035,0.00001724025,0.00007431013,0.00003989094,0.8691697,0.00051774026,0.119307235,0.0021377543,0.008508286],"study_design_scores_gemma":[0.000007838647,0.000012365299,0.000046402944,0.000010658151,0.00000779996,0.00003558892,0.000008934873,0.97392243,0.00012399716,0.020375868,0.0054398086,0.000008255073],"about_ca_topic_score_codex":0.0059495573,"about_ca_topic_score_gemma":0.005864919,"teacher_disagreement_score":0.0072300253,"about_ca_system_score_codex":0.0023081407,"about_ca_system_score_gemma":0.0018981689,"threshold_uncertainty_score":0.02418679},"labels":[],"label_agreement":null},{"id":"W2043266505","doi":"10.1061/(asce)co.1943-7862.0000298","title":"Construction Engineering Today","year":2011,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Linnaeus Plant Sciences (Canada)","funders":"","keywords":"Work (physics); Plan (archaeology); Process (computing); Construction engineering; Key (lock); Field (mathematics); Engineering; Engineering management; Computer science; Civil engineering; Computer security; Mechanical engineering; Geography; Archaeology","score_opus":0.006036222721732598,"score_gpt":0.160348930259966,"score_spread":0.1543127075382334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043266505","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034042932,0.016164692,0.010235857,0.036515597,0.00474234,0.00006201384,0.00035826585,0.0008180712,0.9276989],"genre_scores_gemma":[0.021132173,0.01016658,0.0059868577,0.0050035696,0.0008093782,0.00005574833,0.00050524203,0.00022417544,0.9561163],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.996999,0.00027885093,0.00013432471,0.00033120497,0.0019889819,0.00026761243],"domain_scores_gemma":[0.99760145,0.00024072302,0.000112348745,0.00045951142,0.0010372617,0.0005486755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002248565,0.0009088529,0.000459722,0.0013485099,0.0030312252,0.006415427,0.0009215758,0.0031341177,0.23497027],"category_scores_gemma":[0.0031309356,0.0004010127,0.00036343222,0.0024613591,0.0017521383,0.0037201669,0.003576297,0.0029887864,0.14510806],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019010557,0.00011257278,0.0012222975,0.00021659835,0.000007873104,0.00011231167,0.00081164367,0.00037305712,0.0018472676,0.073195234,0.52081364,0.40126857],"study_design_scores_gemma":[6.142127e-7,0.000005472101,0.00030536024,0.000033607233,5.580244e-7,0.00006816693,0.00014355237,0.000028328508,0.000071906805,0.0022166248,0.9971228,0.0000028701756],"about_ca_topic_score_codex":0.003442546,"about_ca_topic_score_gemma":0.009554737,"teacher_disagreement_score":0.23497027,"about_ca_system_score_codex":0.002534776,"about_ca_system_score_gemma":0.004147482,"threshold_uncertainty_score":0.7860539},"labels":[],"label_agreement":null},{"id":"W2043303247","doi":"10.1145/1878537.1878742","title":"BIM-based building dashboard","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Dashboard; Computer science; Occupancy; Visualization; Context (archaeology); Data visualization; Set (abstract data type); Human–computer interaction; Database; Data mining; Architectural engineering; Engineering","score_opus":0.004479858944589057,"score_gpt":0.19696841121006128,"score_spread":0.19248855226547223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2043303247","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032658916,0.000424945,0.67235565,0.0009662461,0.0008130709,0.00060317834,0.03000708,0.14723897,0.11493193],"genre_scores_gemma":[0.450238,0.0014075317,0.41969845,0.00043056483,0.00020545047,0.0010753394,0.05485731,0.010314671,0.061772678],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938524,0.00008266985,0.000026481875,0.000059234986,0.0003947683,0.00005156904],"domain_scores_gemma":[0.99923027,0.0001296968,0.000033363063,0.00017539776,0.00031497073,0.000116323885],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00074166735,0.0011652107,0.0007067373,0.0013091767,0.00044161145,0.0020896252,0.0011477447,0.00060644554,0.03369491],"category_scores_gemma":[0.002225509,0.0004379101,0.00040618374,0.0016347574,0.00027879968,0.0013269995,0.0020068677,0.0011985074,0.010750806],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008640233,0.00043335295,0.0031838082,0.00072912185,0.00010701122,0.00087677094,0.0010346154,0.12870926,0.024325699,0.03249653,0.3547165,0.45252338],"study_design_scores_gemma":[0.00011589376,0.00012335955,0.0041921134,0.00016107189,0.000046038018,0.00019156677,0.000461895,0.50617063,0.02539369,0.016358443,0.44665757,0.00012772312],"about_ca_topic_score_codex":0.0048031383,"about_ca_topic_score_gemma":0.0073877703,"teacher_disagreement_score":0.03369491,"about_ca_system_score_codex":0.00040783762,"about_ca_system_score_gemma":0.0005690175,"threshold_uncertainty_score":0.11272073},"labels":[],"label_agreement":null},{"id":"W2044130816","doi":"10.1111/j.1467-8667.2006.00456.x","title":"Mobile Model-Based Bridge Lifecycle Management System","year":2006,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Bridge (graph theory); Computer science; Application lifecycle management; System lifecycle; Java; Systems engineering; Software engineering; Database; Embedded system; Operating system; Engineering; Software","score_opus":0.0024965107397700538,"score_gpt":0.15683243461842353,"score_spread":0.15433592387865347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2044130816","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052197095,0.00030143542,0.80867696,0.00024646265,0.00014829355,0.00035352723,0.003427107,0.11827117,0.01637803],"genre_scores_gemma":[0.7417218,0.00046304453,0.21714592,0.00041534362,0.00006788347,0.0007998075,0.012903555,0.0020415077,0.024441076],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997011,0.000035755333,0.000025263767,0.00006292708,0.00014374785,0.00003123154],"domain_scores_gemma":[0.9995431,0.00007726477,0.000038766004,0.00016740167,0.00011784245,0.000055703862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005522186,0.00051635987,0.0008536499,0.0013917133,0.00045602155,0.0010493811,0.0013635189,0.00069447723,0.011884102],"category_scores_gemma":[0.0010209185,0.00034968354,0.00040246814,0.0007572158,0.00020970547,0.0013292896,0.0013794767,0.0004948298,0.0042271335],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022619732,0.0010171039,0.007230142,0.00040191133,0.00023487075,0.0006407402,0.00046010158,0.06391753,0.06757258,0.02328984,0.09322337,0.7397497],"study_design_scores_gemma":[0.0004479564,0.00034420047,0.00390497,0.00007042805,0.00020868336,0.00042988357,0.00015135603,0.8407042,0.043091383,0.011384439,0.0991323,0.00013008616],"about_ca_topic_score_codex":0.0030306329,"about_ca_topic_score_gemma":0.003471583,"teacher_disagreement_score":0.011884102,"about_ca_system_score_codex":0.00051867956,"about_ca_system_score_gemma":0.0005994415,"threshold_uncertainty_score":0.03975624},"labels":[],"label_agreement":null},{"id":"W2045053213","doi":"10.1016/j.aei.2015.01.005","title":"Joint probability for evaluating the schedule and cost of stochastic simulation models","year":2015,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Computer science; Joint probability distribution; Joint (building); Conditional probability; Operations research; Reliability engineering; Engineering; Statistics; Mathematics","score_opus":0.062428956612674606,"score_gpt":0.28021842896793586,"score_spread":0.21778947235526125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045053213","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05409001,0.00014628786,0.9425889,0.00013788854,0.000027953682,0.00007808941,0.0001694994,0.00045278447,0.00230854],"genre_scores_gemma":[0.87178135,0.00025294334,0.12468179,0.000042990996,0.000067597706,0.00032343587,0.0005486054,0.00026914975,0.0020321382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953616,0.0023153154,0.00024066634,0.00039349328,0.001342918,0.00034601777],"domain_scores_gemma":[0.9630308,0.031271473,0.001745854,0.0017389316,0.001611954,0.00060101575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0076603517,0.0012556363,0.0018566941,0.003199609,0.0007295276,0.0023528791,0.0017145363,0.0014929781,0.0039394824],"category_scores_gemma":[0.038042534,0.0015218664,0.0017695018,0.001819368,0.0015222541,0.00297723,0.0016275235,0.0015457835,0.000375029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049842005,0.000017995837,0.000568606,0.0000133763415,0.000026210893,0.0000140620305,0.000008077124,0.98467124,0.00016969627,0.011271941,0.000089648645,0.0030993165],"study_design_scores_gemma":[0.0000028342529,0.000011693373,0.00014648696,0.0000026330886,0.000008330332,0.0000049197356,0.0000022253498,0.9956741,0.00012785339,0.0039615827,0.000053859178,0.0000034173956],"about_ca_topic_score_codex":0.008903781,"about_ca_topic_score_gemma":0.0059860954,"teacher_disagreement_score":0.008903781,"about_ca_system_score_codex":0.0033090082,"about_ca_system_score_gemma":0.0025885345,"threshold_uncertainty_score":0.040512264},"labels":[],"label_agreement":null},{"id":"W2045216131","doi":"10.1016/j.autcon.2005.12.002","title":"Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot","year":2006,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Robot; Clearing; Control engineering; Computer science; Control (management); Simulation; Engineering; Artificial intelligence; Business","score_opus":0.011480873834064202,"score_gpt":0.22435559485731763,"score_spread":0.21287472102325342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2045216131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041889805,0.00010150542,0.94761753,0.00016666546,0.000050865296,0.000094278934,0.00008215222,0.001823376,0.0081737805],"genre_scores_gemma":[0.9469111,0.00010171396,0.048075613,0.000047640377,0.000009572357,0.00019948842,0.00008687073,0.00011666224,0.0044512628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963665,0.00012110214,0.000016616019,0.000051133422,0.00013248577,0.000041989544],"domain_scores_gemma":[0.99953175,0.00021993312,0.000064586326,0.000043191416,0.00011020861,0.000030309884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054006564,0.00067611603,0.00072117883,0.0004449388,0.00056066585,0.001037864,0.0012023287,0.0011652951,0.0044038934],"category_scores_gemma":[0.0011029253,0.00048069062,0.000777977,0.0002746929,0.0007257848,0.00053826516,0.0007788267,0.0006498521,0.0005464074],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006461069,0.000018079252,0.0001409816,0.000024883379,0.000008715915,0.000041861415,0.000041457137,0.98894775,0.0027712388,0.002868775,0.00014894702,0.0049227155],"study_design_scores_gemma":[0.000012308804,0.000019782135,0.00005174758,0.000002957682,0.0000053991166,0.000005361179,0.000004159762,0.998166,0.000854332,0.000497044,0.00037782567,0.0000030813123],"about_ca_topic_score_codex":0.010553401,"about_ca_topic_score_gemma":0.007260351,"teacher_disagreement_score":0.010553401,"about_ca_system_score_codex":0.00064668816,"about_ca_system_score_gemma":0.00089411036,"threshold_uncertainty_score":0.020983934},"labels":[],"label_agreement":null},{"id":"W2046011793","doi":"10.5555/1639809.1655402","title":"Developing a general purpose simulation model for steel pipe-rack installation","year":2009,"lang":"en","type":"article","venue":"Spring Simulation Multiconference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Rack; Piping; Engineering; Resource (disambiguation); Software; Duration (music); Instrumentation (computer programming); Computer science; Mechanical engineering","score_opus":0.048276606315324246,"score_gpt":0.2933228073973925,"score_spread":0.2450462010820683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2046011793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12229601,0.00022006952,0.8368335,0.0003242905,0.00013119676,0.00037016493,0.0017783326,0.004366493,0.03368002],"genre_scores_gemma":[0.7559357,0.0005589311,0.22406366,0.000091142894,0.000029808818,0.00093488436,0.002443267,0.00059901905,0.015343508],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999759,0.000067110326,0.000016523534,0.00003845488,0.00007849218,0.000040274128],"domain_scores_gemma":[0.99959034,0.00018153344,0.000036484296,0.000036206482,0.00012485682,0.000030546107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050703884,0.0007770579,0.00086406345,0.0005459475,0.0006568766,0.0009682937,0.0014017506,0.0014314831,0.0056107626],"category_scores_gemma":[0.0011891082,0.0006904339,0.0011205646,0.0008253594,0.00044412224,0.0008779655,0.0006885122,0.00089926005,0.00083351816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015405625,0.000013800431,0.0003269819,0.00001594235,0.000005487579,0.00002626395,0.000021470874,0.995308,0.00061639055,0.001578951,0.00021127409,0.0018600838],"study_design_scores_gemma":[0.0000070892233,0.000006022028,0.00006201659,0.0000027882177,0.000003011989,0.000005357216,0.0000055853907,0.99824095,0.00038210265,0.00026673626,0.0010149674,0.0000033677195],"about_ca_topic_score_codex":0.024114357,"about_ca_topic_score_gemma":0.015566687,"teacher_disagreement_score":0.024114357,"about_ca_system_score_codex":0.0012641912,"about_ca_system_score_gemma":0.002513317,"threshold_uncertainty_score":0.047948003},"labels":[],"label_agreement":null},{"id":"W2048925155","doi":"10.1117/12.470731","title":"&lt;title&gt;Re-engineering organizations for optimal deployment of smart materials and intelligent devices in civil infrastructure&lt;/title&gt;","year":2002,"lang":"en","type":"article","venue":"Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Software deployment; Scope (computer science); Business process reengineering; Computer science; Building automation; Data collection; Domain (mathematical analysis); Systems engineering; Engineering management; Engineering; Software engineering; Manufacturing engineering","score_opus":0.008136071057903394,"score_gpt":0.2008822047774641,"score_spread":0.1927461337195607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2048925155","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048370358,0.0078553,0.51826817,0.10288657,0.003411256,0.0025576442,0.0015697584,0.0057798433,0.3093011],"genre_scores_gemma":[0.3427555,0.0061827134,0.5081234,0.0028763064,0.0007831951,0.0007234565,0.0019809264,0.00079636776,0.1357782],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976375,0.0008919396,0.00014385993,0.00018705468,0.0008384928,0.00030121874],"domain_scores_gemma":[0.9970848,0.00073415734,0.0003468266,0.00037058146,0.0010351072,0.0004285617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004487503,0.00046059868,0.00040144063,0.0016636549,0.002590951,0.0073319455,0.0011812454,0.0020659193,0.027633341],"category_scores_gemma":[0.004364999,0.0002433066,0.00044651324,0.0016609455,0.0015942977,0.0058690375,0.0020348916,0.0012079478,0.0080753835],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007298401,0.00028580285,0.0039763153,0.0005277635,0.000018242681,0.0003715232,0.0012801602,0.006001942,0.0058054877,0.3344608,0.26199302,0.38520595],"study_design_scores_gemma":[0.00007350883,0.0002883938,0.008445852,0.00095813774,0.000032686672,0.0005798591,0.006826206,0.037875444,0.014131899,0.15642214,0.7742277,0.0001381897],"about_ca_topic_score_codex":0.008450668,"about_ca_topic_score_gemma":0.017485792,"teacher_disagreement_score":0.027633341,"about_ca_system_score_codex":0.0049776905,"about_ca_system_score_gemma":0.008392559,"threshold_uncertainty_score":0.09244275},"labels":[],"label_agreement":null},{"id":"W2050255150","doi":"10.1061/41109(373)11","title":"Real Time Information Integration via \"i-Booth\"","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Interface (matter); Productivity; Computer science; Process (computing); Automation; Information system; Point (geometry); Office automation; System integration; User interface; Graphical user interface; Management information systems; Information technology; Information management; Software engineering; Engineering; Knowledge management; Database; Operating system","score_opus":0.0021742284984112153,"score_gpt":0.17064928456159922,"score_spread":0.16847505606318802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2050255150","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07637956,0.00030742772,0.82235307,0.0007338182,0.0003297213,0.00066925015,0.0002996192,0.033798553,0.06512896],"genre_scores_gemma":[0.5919559,0.00029843074,0.38092437,0.00041541134,0.00011633285,0.00034878976,0.00043110407,0.00089275313,0.024616882],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99882716,0.00029052352,0.000058706137,0.000193962,0.00051162305,0.00011794765],"domain_scores_gemma":[0.9990441,0.0002760783,0.000088965935,0.00033125383,0.00019028496,0.00006921165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001026194,0.00052746356,0.0003977201,0.00084366667,0.00044169373,0.0017194459,0.0011649638,0.0006730433,0.010285111],"category_scores_gemma":[0.0022069844,0.00026917923,0.00032098667,0.0006433431,0.00083846226,0.0021442305,0.001990061,0.00066879124,0.0023246561],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010483108,0.00056591723,0.005087493,0.00063769263,0.0000724423,0.0012842652,0.005291152,0.005450338,0.10964129,0.08252209,0.035632323,0.7527667],"study_design_scores_gemma":[0.00023216683,0.0024922516,0.012141759,0.0005492672,0.00021822934,0.0043429523,0.00211733,0.14140607,0.29532585,0.039470393,0.5013836,0.000320181],"about_ca_topic_score_codex":0.00097150163,"about_ca_topic_score_gemma":0.00068115554,"teacher_disagreement_score":0.010285111,"about_ca_system_score_codex":0.00028700728,"about_ca_system_score_gemma":0.0006269759,"threshold_uncertainty_score":0.03440714},"labels":[],"label_agreement":null},{"id":"W2051170580","doi":"10.1061/(asce)cp.1943-5487.0000398","title":"Erratum for “Tracking the Built Status of MEP Works: Assessing the Value of a Scan-vs.-BIM System” by Frédéric Bosché, Adrien Guillemet, Yelda Turkan, Carl T. Haas, and Ralph Haas","year":2014,"lang":"en","type":"erratum","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Value (mathematics); Engineering; Computer science; Machine learning","score_opus":0.008265015002356432,"score_gpt":0.2350079744955059,"score_spread":0.22674295949314946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051170580","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005427887,0.001749251,0.0019466543,0.11797911,0.84991443,0.00013082381,0.0043356875,0.0011753915,0.022225907],"genre_scores_gemma":[0.012839443,0.008141395,0.007688031,0.15583311,0.14593017,0.00061449927,0.012891826,0.0028495404,0.653212],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943165,0.00071213534,0.0009466571,0.00043697108,0.0033204085,0.00026726068],"domain_scores_gemma":[0.96777445,0.0069779996,0.0012600442,0.0010807556,0.022174083,0.00073262304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030586307,0.0017664882,0.0013397902,0.004054796,0.0051008514,0.0037373477,0.0024104787,0.0062683336,0.058797],"category_scores_gemma":[0.047563706,0.0009915876,0.001071321,0.0022813776,0.0017961261,0.002484982,0.0024992751,0.006761903,0.043985073],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014237994,0.000005321908,0.000038781065,0.000034826666,0.0000020985908,0.000056908706,0.000016534297,0.000024311006,0.000021712563,0.00025998152,0.99679035,0.002735003],"study_design_scores_gemma":[0.00002390505,0.00003206182,0.0008310064,0.0003413531,0.000019072202,0.00020140236,0.00018116614,0.00021196107,0.0003984747,0.0005925402,0.9971322,0.000034799657],"about_ca_topic_score_codex":0.04914105,"about_ca_topic_score_gemma":0.045503642,"teacher_disagreement_score":0.058797,"about_ca_system_score_codex":0.0041378904,"about_ca_system_score_gemma":0.0074982215,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W2051592596","doi":"10.3992/jgb.1.1.63","title":"Compressive Testing and Analysis of Plastered Straw Bales","year":2006,"lang":"en","type":"article","venue":"Journal of Green Building","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"","keywords":"Compressive strength; Straw; Structural engineering; Engineering; Materials science; Composite material; Chemistry","score_opus":0.012153958329760128,"score_gpt":0.21485742796837676,"score_spread":0.20270346963861663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2051592596","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9930917,0.00018818912,0.0043523223,0.000015304182,0.000023459645,0.000045294877,0.00016197347,0.00004947323,0.0020723075],"genre_scores_gemma":[0.9954993,0.00007524309,0.002440779,0.00001143081,0.0000035560277,0.000013744184,0.00011667992,0.000013874191,0.0018253168],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999479,0.000032369142,0.000021390371,0.000054817916,0.0003670989,0.00004533345],"domain_scores_gemma":[0.9989742,0.00024075789,0.0001044334,0.00008212384,0.0005026962,0.000095831376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004796089,0.000356707,0.00022904675,0.0007195697,0.00038193873,0.0002330172,0.00034555912,0.00035407735,0.0036478685],"category_scores_gemma":[0.0011201467,0.0001856232,0.00017119259,0.00062482746,0.0005347395,0.0003045285,0.00029259964,0.00037971762,0.00033457222],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014795066,0.00003713342,0.002493485,0.00008592824,0.000009690149,0.0002587155,0.00021514215,0.0015787582,0.9856308,0.00015575359,0.00005894434,0.009327794],"study_design_scores_gemma":[0.000015271344,0.0010453425,0.06344199,0.00005469108,0.000028394688,0.00039848778,0.00074271305,0.0060212193,0.92487746,0.0002073543,0.0031394467,0.00002753667],"about_ca_topic_score_codex":0.0008617001,"about_ca_topic_score_gemma":0.0028754591,"teacher_disagreement_score":0.0036478685,"about_ca_system_score_codex":0.00014478822,"about_ca_system_score_gemma":0.00019576035,"threshold_uncertainty_score":0.012203336},"labels":[],"label_agreement":null},{"id":"W2052621624","doi":"10.1061/(asce)co.1943-7862.0000224","title":"SuretyAssist: Fuzzy Expert System to Assist Surety Underwriters in Evaluating Construction Contractors for Bonding","year":2010,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Surety; Underwriting; Fuzzy logic; Process (computing); Work (physics); Expert system; Risk analysis (engineering); Actuarial science; Computer science; Engineering; Construction engineering; Business; Artificial intelligence; Finance","score_opus":0.009430282465756085,"score_gpt":0.23643158085498223,"score_spread":0.22700129838922614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052621624","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15582943,0.00031154466,0.80924886,0.00051377155,0.000113500435,0.00094069145,0.0016532298,0.020657176,0.01073179],"genre_scores_gemma":[0.43528217,0.00017698719,0.5566326,0.00022309423,0.000029583623,0.00039705815,0.0011981413,0.00016055518,0.0058999113],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923646,0.00023072747,0.00009993621,0.00015065745,0.00024032783,0.000041899188],"domain_scores_gemma":[0.9974891,0.0012176083,0.00016820918,0.0001649411,0.0008538633,0.000106211104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027545004,0.0006329233,0.0008608379,0.0015982898,0.0006412413,0.0010656959,0.0010334364,0.0012340706,0.007270917],"category_scores_gemma":[0.0070379195,0.00040639154,0.00034055658,0.00051691465,0.00030083797,0.0011172668,0.000795918,0.00053295266,0.001529704],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020212152,0.0007429699,0.012435268,0.0006535476,0.00018131944,0.0010702496,0.0014828361,0.13511308,0.05338603,0.0060858545,0.04004658,0.7467811],"study_design_scores_gemma":[0.00017743805,0.00023435072,0.0045154644,0.00010455056,0.00006171102,0.00040022907,0.0002806716,0.96242875,0.01603754,0.0038138279,0.011845905,0.00009958755],"about_ca_topic_score_codex":0.007046909,"about_ca_topic_score_gemma":0.010088825,"teacher_disagreement_score":0.007270917,"about_ca_system_score_codex":0.00087437977,"about_ca_system_score_gemma":0.0014464498,"threshold_uncertainty_score":0.024323583},"labels":[],"label_agreement":null},{"id":"W2052764147","doi":"10.1061/(asce)0733-9364(2006)132:2(143)","title":"Computer-Aided Site Layout Planning","year":2006,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Representation (politics); Reuse; Interconnectivity; Computer Aided Design; Visualization; Object (grammar); Domain (mathematical analysis); Knowledge base; Process (computing); Engineering drawing; Data mining; Programming language; Artificial intelligence; Engineering","score_opus":0.003312205326125199,"score_gpt":0.16839096680295146,"score_spread":0.16507876147682626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2052764147","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011070868,0.00019235686,0.96225387,0.000108463886,0.000034619366,0.00013010876,0.0009457363,0.005055385,0.020208538],"genre_scores_gemma":[0.3094526,0.00067045813,0.66392016,0.000052802494,0.000015856496,0.00051229005,0.0024924465,0.0006569738,0.022226457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943393,0.00008986265,0.000024155868,0.00008118909,0.00033556702,0.000035133547],"domain_scores_gemma":[0.9996184,0.00015893925,0.000025487698,0.00007911229,0.00009756187,0.000020359126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037515792,0.00073187053,0.0008136577,0.0010044896,0.00045675284,0.0016020302,0.0016677505,0.001008565,0.016242947],"category_scores_gemma":[0.00090633857,0.0005617381,0.0007527479,0.0010689701,0.000420081,0.00097563997,0.00083871436,0.00046344992,0.002774387],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007938891,0.000055492943,0.00079432427,0.00016462148,0.000021124544,0.00017080516,0.00017152863,0.8709279,0.00545225,0.015548228,0.0063021365,0.10031234],"study_design_scores_gemma":[0.00002691801,0.000030293639,0.000423111,0.000026984917,0.000015548683,0.00015720024,0.000043780128,0.95742506,0.0038291828,0.003580747,0.03441134,0.000029824094],"about_ca_topic_score_codex":0.011645111,"about_ca_topic_score_gemma":0.017826676,"teacher_disagreement_score":0.016242947,"about_ca_system_score_codex":0.0010299747,"about_ca_system_score_gemma":0.0015714467,"threshold_uncertainty_score":0.054338098},"labels":[],"label_agreement":null},{"id":"W2053187089","doi":"10.18260/1-2--8497","title":"Internet Based Interactive Construction Management Learning System","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Arizona State University; Western Michigan University; University of Alberta; National Science Foundation","keywords":"Computer science; The Internet; Session (web analytics); VRML; Curriculum; Mentorship; Multimedia; Construction management; Engineering management; World Wide Web; Engineering","score_opus":0.008006505658001973,"score_gpt":0.17796971701876815,"score_spread":0.16996321136076617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2053187089","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08929224,0.00054621976,0.40937,0.0011182275,0.00022881562,0.0026070243,0.010809949,0.22811368,0.2579139],"genre_scores_gemma":[0.47907954,0.00082843885,0.24238203,0.0009050046,0.00021157197,0.0038712786,0.029396245,0.0041603823,0.23916543],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955744,0.00009807561,0.000038118542,0.000096298056,0.00015927458,0.00005068641],"domain_scores_gemma":[0.9991418,0.00028069413,0.000042664,0.00018012717,0.00019876387,0.0001558838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007403691,0.0005297925,0.0004579092,0.0012706443,0.0004990372,0.0014603594,0.0013659396,0.00076843495,0.07476732],"category_scores_gemma":[0.0013620768,0.00024403004,0.00032391417,0.0009930804,0.00019895897,0.0010885996,0.002011052,0.0006969423,0.020659823],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019291352,0.0019561558,0.007479606,0.00039917068,0.000054741427,0.0007927951,0.0006900959,0.009696014,0.022087902,0.011881651,0.15569367,0.7873391],"study_design_scores_gemma":[0.0008620374,0.0011392147,0.014263366,0.0001499099,0.0001587012,0.0010473516,0.00029549867,0.14051764,0.03447515,0.01292663,0.79397285,0.00019164226],"about_ca_topic_score_codex":0.0011031202,"about_ca_topic_score_gemma":0.00094189687,"teacher_disagreement_score":0.07476732,"about_ca_system_score_codex":0.0005564977,"about_ca_system_score_gemma":0.00088619953,"threshold_uncertainty_score":0.2501216},"labels":[],"label_agreement":null},{"id":"W2055331093","doi":"10.3141/2456-06","title":"New and Innovative Concrete Pavements with Structural Dome Formwork System","year":2014,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Formwork; Truck; Engineering; Civil engineering; Interlocking; Slab; Forensic engineering; Structural engineering","score_opus":0.028450089863455406,"score_gpt":0.3018075542387965,"score_spread":0.2733574643753411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055331093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92255294,0.00048166202,0.07111042,0.000054942127,0.000055895383,0.00021592288,0.00021509318,0.00083729654,0.004475857],"genre_scores_gemma":[0.9445429,0.00017131995,0.051064946,0.000020519657,0.0000057644897,0.000047224858,0.00019193401,0.000028111128,0.0039273105],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995994,0.00005486992,0.000020702983,0.0000708272,0.00018746794,0.000066729175],"domain_scores_gemma":[0.9996674,0.000024058734,0.00006720902,0.0000712437,0.00009223025,0.000077811994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003396097,0.00040479936,0.00028070618,0.0007197264,0.00025473765,0.00048567334,0.00057341467,0.00046429402,0.0010233184],"category_scores_gemma":[0.000381172,0.00022472342,0.00027862538,0.00039056217,0.00037108743,0.00044845496,0.00048173324,0.00032941575,0.0004850113],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023421962,0.00022517722,0.0062564714,0.0002400673,0.00002405597,0.000550576,0.00013060687,0.016493788,0.9308533,0.002037698,0.00045908187,0.042494867],"study_design_scores_gemma":[0.000098271696,0.0053110137,0.043763563,0.00006276775,0.00008491359,0.0022732324,0.0002998657,0.045462873,0.8604344,0.00090574403,0.041155297,0.00014806847],"about_ca_topic_score_codex":0.00083781936,"about_ca_topic_score_gemma":0.0026464185,"teacher_disagreement_score":0.0010233184,"about_ca_system_score_codex":0.00026068976,"about_ca_system_score_gemma":0.0004227063,"threshold_uncertainty_score":0.0034233332},"labels":[],"label_agreement":null},{"id":"W2055720265","doi":"10.1139/l03-002","title":"Data acquisition and analysis for highway construction using geographic information systems","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Earthworks; Terrain; Geographic information system; Interface (matter); Software; Computer science; Data acquisition; Key (lock); Information system; Data mining; Transport engineering; Engineering; Remote sensing","score_opus":0.010822040198297167,"score_gpt":0.18431591202702685,"score_spread":0.1734938718287297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055720265","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030726157,0.0003564233,0.9320773,0.0006241396,0.00008065255,0.0010222138,0.013793341,0.011821531,0.009498318],"genre_scores_gemma":[0.21850492,0.0009152831,0.75188017,0.00009914666,0.00003724821,0.0015424023,0.022235679,0.00047265954,0.0043124473],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9990938,0.00020015829,0.00010867918,0.000067773435,0.00049523497,0.000034520508],"domain_scores_gemma":[0.99828655,0.00046675917,0.00013175269,0.00033349055,0.0007344872,0.000046907448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012296255,0.00053649826,0.00055100326,0.0024614,0.00073133956,0.001280557,0.00066137844,0.00034870947,0.0061158584],"category_scores_gemma":[0.005368516,0.0003756697,0.000621516,0.003773631,0.00023073607,0.0010482939,0.00080449786,0.00046118695,0.0020786459],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017841946,0.00018238043,0.017666798,0.00060305366,0.00010277907,0.00039514145,0.00050249294,0.2164611,0.0066879494,0.02186011,0.035777535,0.6995823],"study_design_scores_gemma":[0.00010819292,0.00018298303,0.02530511,0.00022174757,0.000111542955,0.00037697016,0.0006221859,0.77804667,0.017509859,0.01404941,0.16332361,0.00014171813],"about_ca_topic_score_codex":0.0352697,"about_ca_topic_score_gemma":0.025455404,"teacher_disagreement_score":0.0352697,"about_ca_system_score_codex":0.0014868532,"about_ca_system_score_gemma":0.003409527,"threshold_uncertainty_score":0.07012886},"labels":[],"label_agreement":null},{"id":"W2055836158","doi":"10.1139/l05-004","title":"Modeling uncertainty with an integrated simulation system","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Duration (music); Computer science; Reliability (semiconductor); Key (lock); Simulation modeling; Industrial engineering; Reliability engineering; Uncertainty analysis; Simulation; Data mining; Engineering; Machine learning","score_opus":0.007462476721214755,"score_gpt":0.17761648831458887,"score_spread":0.17015401159337412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2055836158","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01570429,0.00008162909,0.9802988,0.0001599867,0.000026990188,0.000073226714,0.000098769335,0.0010638428,0.0024924462],"genre_scores_gemma":[0.6208797,0.0004104462,0.37520587,0.00008322037,0.00005521575,0.0005606019,0.00045059057,0.00012348559,0.0022308594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99840313,0.00068265066,0.0001404621,0.0002599161,0.00042923723,0.00008468585],"domain_scores_gemma":[0.9972373,0.0016726783,0.0002515067,0.00025560427,0.0005078021,0.00007492883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022987877,0.0009507273,0.0010287586,0.0013113156,0.00077410124,0.002744457,0.0013523555,0.001280837,0.0025800574],"category_scores_gemma":[0.0074555855,0.0006903073,0.00085814926,0.001152302,0.00073131657,0.0025897967,0.001724313,0.0013126688,0.00042232807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050606355,0.000039687377,0.0009588679,0.0000229516,0.000049787388,0.000042816308,0.000083915686,0.97056556,0.00044461494,0.009798625,0.00025115846,0.017691307],"study_design_scores_gemma":[0.000005528093,0.000011248329,0.000053081607,0.000004767223,0.00000990427,0.000007067774,0.00000815639,0.9950204,0.00016621409,0.004060354,0.00064860575,0.0000045772845],"about_ca_topic_score_codex":0.01127784,"about_ca_topic_score_gemma":0.004933463,"teacher_disagreement_score":0.01127784,"about_ca_system_score_codex":0.0013895035,"about_ca_system_score_gemma":0.0018973895,"threshold_uncertainty_score":0.0224244},"labels":[],"label_agreement":null},{"id":"W2056014594","doi":"10.3141/1974-03","title":"Analytic Hierarchy Process as a Tool for Infrastructure Management","year":2006,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Analytic hierarchy process; Process (computing); Hierarchy; Process management; Engineering; Computer science; Management science; Transport engineering; Operations research; Business; Economics","score_opus":0.022982463188394087,"score_gpt":0.3261378533297715,"score_spread":0.30315539014137743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056014594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010447666,0.003513059,0.97580713,0.002838133,0.000342202,0.00091738545,0.0004621479,0.0017560789,0.013319053],"genre_scores_gemma":[0.010560755,0.0015735575,0.9849069,0.00022289311,0.00014180114,0.0011403145,0.00031985075,0.0001081337,0.0010257293],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.95628613,0.028563295,0.003498531,0.0014517965,0.009688788,0.00051144965],"domain_scores_gemma":[0.97024405,0.022569874,0.0011967033,0.0016517875,0.0036558507,0.0006817023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031672314,0.0019522086,0.0022102376,0.0112396525,0.002568502,0.009915509,0.0032144391,0.0022617867,0.008394453],"category_scores_gemma":[0.03530906,0.0012854676,0.002053473,0.013538032,0.0038652213,0.0053752214,0.0038901318,0.0052608773,0.0024401625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011863344,0.00023402732,0.00090904825,0.002627114,0.00029746795,0.0006414762,0.0030273243,0.035859805,0.0015556952,0.53344244,0.034940638,0.38634637],"study_design_scores_gemma":[0.00015547383,0.00036291944,0.0010714156,0.0020879703,0.00011894541,0.00046501023,0.0018179896,0.101296,0.0014862741,0.6080703,0.2828757,0.00019196514],"about_ca_topic_score_codex":0.0046817493,"about_ca_topic_score_gemma":0.0040121735,"teacher_disagreement_score":0.031672314,"about_ca_system_score_codex":0.00461469,"about_ca_system_score_gemma":0.00978412,"threshold_uncertainty_score":0.16750121},"labels":[],"label_agreement":null},{"id":"W2056939082","doi":"10.1139/l05-126","title":"Geographic information system based roadway construction planning","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Information system; Computer science; Geographic information system; Plan (archaeology); Earthworks; Process (computing); Construction management; Integrated business planning; Information integration; Systems engineering; Transport engineering; Engineering; Database; Civil engineering; Operations management","score_opus":0.0029130582655594347,"score_gpt":0.14026369327163948,"score_spread":0.13735063500608005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2056939082","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05628794,0.00049661414,0.88880736,0.0005022778,0.000096717886,0.0006487752,0.003945281,0.010741837,0.038473144],"genre_scores_gemma":[0.5024376,0.00067081716,0.48103324,0.000055609562,0.000028972667,0.0004511634,0.006642322,0.00032987425,0.008350353],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99948263,0.00016255694,0.000051858497,0.00007840076,0.00017858426,0.000045933433],"domain_scores_gemma":[0.9994815,0.00013869544,0.000051013907,0.00007545618,0.00021202306,0.000041285974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006328404,0.00045708497,0.00033923629,0.0020759266,0.0006962333,0.0014931998,0.00076004164,0.00034377867,0.0070431298],"category_scores_gemma":[0.0011057237,0.00025799952,0.00039565723,0.0027276585,0.00042699274,0.0010919262,0.00074523885,0.0003029757,0.001352785],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021178769,0.00012870195,0.0068412274,0.0003197499,0.00009456045,0.00032913842,0.00065828464,0.41026235,0.008976699,0.0340551,0.021676358,0.5164461],"study_design_scores_gemma":[0.0001297403,0.00016692701,0.007392973,0.00008380141,0.00014516583,0.00021503013,0.0007655238,0.7814609,0.02246561,0.021199947,0.1658439,0.00013052813],"about_ca_topic_score_codex":0.024601683,"about_ca_topic_score_gemma":0.030909052,"teacher_disagreement_score":0.9753983,"about_ca_system_score_codex":0.0013514741,"about_ca_system_score_gemma":0.0028967063,"threshold_uncertainty_score":0.048916996},"labels":[],"label_agreement":null},{"id":"W2058787072","doi":"10.1080/01446190500039911","title":"Deterministic models for assessing productivity and cost of bored piles","year":2005,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Pile; Productivity; Engineering; Scheduling (production processes); Process (computing); Cost estimate; Civil engineering; Operations research; Operations management; Computer science; Geotechnical engineering; Economics","score_opus":0.016615757420088497,"score_gpt":0.20985470128868106,"score_spread":0.19323894386859256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2058787072","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3533258,0.0005893613,0.63531196,0.000235369,0.000046358666,0.00017343574,0.0016394474,0.0006697127,0.008008436],"genre_scores_gemma":[0.96980613,0.000360361,0.026252685,0.000015951571,0.000011553092,0.00020125377,0.00056179956,0.0000364077,0.0027538382],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991398,0.00024072846,0.00005682885,0.00017173254,0.00023392314,0.00015696276],"domain_scores_gemma":[0.99663925,0.0021198252,0.0005941373,0.00022778206,0.00035146796,0.0000675401],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00150858,0.0010383149,0.00063260365,0.0011108806,0.0003511114,0.0013876408,0.0016020606,0.0010347678,0.0018407388],"category_scores_gemma":[0.0054031834,0.000795615,0.0010421184,0.0012057964,0.0005555244,0.0009367615,0.00060298137,0.00079350075,0.00028820938],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000113956785,0.000008252487,0.00056603714,0.0000071348923,0.0000053510803,0.000006857255,0.0000055287237,0.99693406,0.00010467574,0.001186179,0.000035551617,0.001129016],"study_design_scores_gemma":[0.0000025365189,0.0000098277715,0.00038744687,0.0000023788564,0.0000048119296,0.0000039068545,0.0000043660116,0.9985096,0.0001460197,0.0008005131,0.00012417007,0.000004463738],"about_ca_topic_score_codex":0.02252085,"about_ca_topic_score_gemma":0.014723771,"teacher_disagreement_score":0.02252085,"about_ca_system_score_codex":0.0022847608,"about_ca_system_score_gemma":0.0013731465,"threshold_uncertainty_score":0.04477948},"labels":[],"label_agreement":null},{"id":"W2060249893","doi":"10.1061/41109(373)35","title":"Simulation-Based Multiple Heavy Lift Planning in Industrial Construction","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Schedule; Lift (data mining); Process (computing); Lifting equipment; Engineering; Computer science; Construction engineering; Systems engineering; Operating system; Mechanical engineering","score_opus":0.020413991150754138,"score_gpt":0.23576834644544578,"score_spread":0.21535435529469166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060249893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2626648,0.00031938608,0.7191649,0.00031889335,0.000058928494,0.0003592965,0.0002213251,0.0016434803,0.015248941],"genre_scores_gemma":[0.83635306,0.00021481194,0.16027492,0.000031905474,0.000007659505,0.00023549607,0.00019045173,0.0000819815,0.0026096879],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995889,0.00019052385,0.000018116194,0.000048715225,0.00009835895,0.000055393175],"domain_scores_gemma":[0.9988331,0.000817949,0.00006608263,0.000051785766,0.00013156133,0.00009947671],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094465644,0.0006572655,0.0009153844,0.00065925356,0.00075873215,0.001048655,0.0010998746,0.0010228335,0.0035124912],"category_scores_gemma":[0.00143531,0.00082543254,0.00072234886,0.0006609339,0.0010099934,0.00059990765,0.0008980369,0.0007112544,0.0002507795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026626867,0.000019716053,0.0002313902,0.000009178519,0.0000049155738,0.000011348819,0.000018644188,0.9966607,0.00019780814,0.0005355882,0.000043760796,0.0022403519],"study_design_scores_gemma":[0.000010690336,0.000011919758,0.000055002878,0.0000031044178,0.0000025091215,0.000002184768,0.000010269949,0.9991912,0.00019109392,0.00032264864,0.00019629255,0.0000030308183],"about_ca_topic_score_codex":0.063055806,"about_ca_topic_score_gemma":0.056196902,"teacher_disagreement_score":0.063055806,"about_ca_system_score_codex":0.002049723,"about_ca_system_score_gemma":0.003024904,"threshold_uncertainty_score":0.1253776},"labels":[],"label_agreement":null},{"id":"W2060590051","doi":"10.1139/l06-086","title":"Nonlinear cash flow optimization model","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cash flow; Outflow; Inflow; Nonlinear programming; Linear programming; Profit (economics); Profit margin; Nonlinear system; Cash flow forecasting; Payment; Computer science; Cash; Operations research; Mathematical optimization; Economics; Finance; Mathematics; Microeconomics; Geology","score_opus":0.004369439984908432,"score_gpt":0.1541945033115943,"score_spread":0.14982506332668585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060590051","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08297498,0.0017579275,0.74858314,0.006220049,0.0005104345,0.00051855325,0.006809351,0.0007446054,0.151881],"genre_scores_gemma":[0.754945,0.0015377332,0.064450316,0.00048526048,0.00017731589,0.00096625293,0.0017066059,0.00014328028,0.17558834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936336,0.00015463625,0.000027550006,0.00016283634,0.00015488717,0.00013675303],"domain_scores_gemma":[0.9991897,0.00039214425,0.000120744764,0.00002415729,0.00020794671,0.00006521636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010300478,0.0012802491,0.001190258,0.0009406713,0.00089526834,0.0021058274,0.0025987765,0.0031457713,0.017847309],"category_scores_gemma":[0.0020910962,0.00078381965,0.00078218326,0.0011293585,0.0012591681,0.0016426758,0.0011639273,0.0015348829,0.0017961604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005723392,0.000046219666,0.0004044284,0.0000922167,0.000013883313,0.00017688736,0.000049985865,0.9473646,0.0004151689,0.04287686,0.002593351,0.005909123],"study_design_scores_gemma":[0.00002117951,0.000018729572,0.00018242796,0.000009238323,0.000008951648,0.00003435319,0.000017873586,0.9873055,0.0001360657,0.009052781,0.0032009003,0.000011943358],"about_ca_topic_score_codex":0.028019173,"about_ca_topic_score_gemma":0.01476983,"teacher_disagreement_score":0.028019173,"about_ca_system_score_codex":0.0035940602,"about_ca_system_score_gemma":0.00303144,"threshold_uncertainty_score":0.05970514},"labels":[],"label_agreement":null},{"id":"W2060710173","doi":"10.1061/41098(368)115","title":"Construction Management of a Marine Terminal Expansion","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Shell (Canada); Victoria General Hospital","funders":"","keywords":"Terminal (telecommunication); Submarine pipeline; Downtime; Aggregate (composite); Civil engineering; Engineering; Environmental science; Computer science; Telecommunications; Geology; Oceanography","score_opus":0.004036953948311921,"score_gpt":0.19032344485802904,"score_spread":0.18628649090971713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060710173","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5426639,0.00044378953,0.15974692,0.0014740598,0.00017631368,0.0011344209,0.00038797577,0.0037154413,0.29025733],"genre_scores_gemma":[0.8863279,0.00025565474,0.05680541,0.000073363895,0.000059486167,0.00027035503,0.00065833755,0.00024713372,0.0553023],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99800307,0.00028531658,0.00008948778,0.00026526194,0.000991107,0.00036568497],"domain_scores_gemma":[0.9980063,0.00016703433,0.00028184504,0.00033412268,0.0006227802,0.00058792444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001900163,0.00045662987,0.00021800413,0.0016792733,0.0030732944,0.0022278503,0.0017940669,0.00065980764,0.01218327],"category_scores_gemma":[0.0026956007,0.00043228499,0.00033724413,0.0009980848,0.0007164942,0.0011591414,0.0022781368,0.00095830957,0.003336268],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004168087,0.00073444535,0.049721323,0.00018295062,0.000037094098,0.002796839,0.004608487,0.08300963,0.04745315,0.015454962,0.036666024,0.7589182],"study_design_scores_gemma":[0.00009670784,0.0031136652,0.19634773,0.00027364527,0.000117858595,0.003824397,0.014778996,0.21257047,0.029867627,0.00700985,0.5316871,0.00031196958],"about_ca_topic_score_codex":0.008613227,"about_ca_topic_score_gemma":0.015241219,"teacher_disagreement_score":0.01218327,"about_ca_system_score_codex":0.0026613798,"about_ca_system_score_gemma":0.003763241,"threshold_uncertainty_score":0.04075712},"labels":[],"label_agreement":null},{"id":"W2060851341","doi":"10.1108/09699980610669705","title":"A knowledge‐based automated development permit approval process in the housing industry","year":2006,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Husky Energy (Canada); University of Alberta","funders":"","keywords":"Process (computing); Computer science; Context (archaeology); Productivity; Process management; Automation; Engineering management; Systems engineering; Risk analysis (engineering); Software engineering; Engineering; Business","score_opus":0.00657935767341986,"score_gpt":0.20934954724409463,"score_spread":0.20277018957067477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2060851341","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29109094,0.0001693266,0.6729371,0.0004286881,0.000039005445,0.0023371696,0.00043127456,0.01144408,0.021122407],"genre_scores_gemma":[0.48709095,0.00014480125,0.50629646,0.00006175601,0.000007987322,0.00038906094,0.0005655962,0.00010594492,0.0053374185],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986021,0.0004373422,0.000101655874,0.0002938572,0.0004807084,0.00008441943],"domain_scores_gemma":[0.9973706,0.0010332634,0.00018030203,0.000641202,0.0006655718,0.00010903973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016973474,0.00035551656,0.0003355556,0.00086761557,0.0008107295,0.0020579277,0.0017077789,0.0008234591,0.005661084],"category_scores_gemma":[0.00471759,0.00045199582,0.00036547065,0.00057242025,0.00069679355,0.0016431849,0.0010739159,0.00043442962,0.0009602843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008935389,0.0022260796,0.007915719,0.00069351756,0.000056518275,0.0018058796,0.0042998926,0.055981874,0.08752966,0.011116925,0.0058623073,0.8216181],"study_design_scores_gemma":[0.00072258007,0.002512966,0.028483588,0.00041191874,0.000248025,0.0018663607,0.0036793235,0.7616935,0.11613183,0.0064702607,0.07749523,0.00028446596],"about_ca_topic_score_codex":0.015998116,"about_ca_topic_score_gemma":0.013084971,"teacher_disagreement_score":0.015998116,"about_ca_system_score_codex":0.001293121,"about_ca_system_score_gemma":0.0030971179,"threshold_uncertainty_score":0.031809986},"labels":[],"label_agreement":null},{"id":"W2061577898","doi":"10.1061/(asce)0733-9364(2008)134:5(311)","title":"Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study","year":2008,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Truck; Robustness (evolution); Duration (music); Resource (disambiguation); Discrete event simulation; Operations research; Resource allocation; Transport engineering; Engineering; Productivity; Computer science; Simulation; Automotive engineering","score_opus":0.009381056740152972,"score_gpt":0.2097687753113331,"score_spread":0.20038771857118012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061577898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9637313,0.0002651584,0.010663829,0.0008352039,0.000026890326,0.00033927866,0.00028360338,0.00009257908,0.023762189],"genre_scores_gemma":[0.9715612,0.00039292834,0.01598903,0.00009410013,0.000018838089,0.00024087934,0.00026557545,0.00003108033,0.011406386],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99875915,0.00046413371,0.000047471072,0.00012056792,0.00035004626,0.00025856518],"domain_scores_gemma":[0.99895155,0.0004879691,0.00010176566,0.00006673592,0.0001916828,0.00020011989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015426596,0.00084497646,0.00061978464,0.0012945357,0.0025486422,0.001592891,0.0016014156,0.0024280874,0.0045995843],"category_scores_gemma":[0.0020778251,0.00043135183,0.00074465456,0.0013900799,0.00074251567,0.0009682194,0.000997321,0.0008470462,0.00039890173],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00089452695,0.0037764192,0.030049823,0.0003559562,0.00014395619,0.024836777,0.0025647783,0.83319515,0.009955183,0.027677536,0.010128613,0.056421276],"study_design_scores_gemma":[0.000406748,0.0027212815,0.027605716,0.00010980504,0.00013061278,0.0035486412,0.0063616717,0.90269965,0.009488911,0.0057864874,0.04099097,0.0001495288],"about_ca_topic_score_codex":0.042819712,"about_ca_topic_score_gemma":0.07442326,"teacher_disagreement_score":0.95718026,"about_ca_system_score_codex":0.0033646917,"about_ca_system_score_gemma":0.0032810331,"threshold_uncertainty_score":0.08514094},"labels":[],"label_agreement":null},{"id":"W2061904488","doi":"10.1007/s12273-013-0120-0","title":"Integrating building information modelling with sustainability to design building projects at the conceptual stage","year":2013,"lang":"en","type":"article","venue":"Building Simulation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":205,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Sustainability; Certification; Interoperability; Sustainable design; Systems engineering; Engineering; Construction engineering; Building design; Conceptual design; Information model; Computer science; Architectural engineering; Software engineering; World Wide Web; Operations management","score_opus":0.01957850118422395,"score_gpt":0.24282782820809679,"score_spread":0.22324932702387285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2061904488","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015128379,0.00020785468,0.9530069,0.0006161216,0.000039233477,0.000075405864,0.00012888253,0.0006887709,0.030108524],"genre_scores_gemma":[0.41721207,0.0007443887,0.5741884,0.00012758232,0.000027313727,0.00017058793,0.0006143357,0.0002671501,0.006648149],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983223,0.000761426,0.00010772716,0.00011436588,0.00058259914,0.00011163183],"domain_scores_gemma":[0.9984503,0.00074712274,0.00011356037,0.00034910606,0.0002639074,0.00007604868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022175184,0.0007584098,0.0006831738,0.0020063098,0.0007542152,0.0045824912,0.0014970397,0.0012453384,0.0071571143],"category_scores_gemma":[0.004831014,0.00080561097,0.0013655871,0.0024918541,0.0012625837,0.0051716473,0.0026542924,0.0010747013,0.001434133],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063192594,0.00024042824,0.0046505295,0.00036204318,0.000116837764,0.00018410844,0.00085647905,0.5247752,0.0043235957,0.32555425,0.0020093964,0.13686399],"study_design_scores_gemma":[0.000019091345,0.00008817921,0.0013193389,0.00023858027,0.00008535454,0.00013629021,0.0006867502,0.7719685,0.0073845,0.17567883,0.042334206,0.000060375252],"about_ca_topic_score_codex":0.005133512,"about_ca_topic_score_gemma":0.009361168,"teacher_disagreement_score":0.0071571143,"about_ca_system_score_codex":0.0014835027,"about_ca_system_score_gemma":0.0026346755,"threshold_uncertainty_score":0.023942947},"labels":[],"label_agreement":null},{"id":"W2062268729","doi":"10.1139/l04-061","title":"Collaborative work model under distributed construction environments","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Building information modeling; Database; Information system; Schedule; Information model; Software engineering; Systems engineering; Scheduling (production processes); Engineering","score_opus":0.0043761449000442225,"score_gpt":0.1611488104281886,"score_spread":0.15677266552814437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062268729","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03089546,0.00027008713,0.86425626,0.0016249851,0.0001456673,0.00035170227,0.00030421262,0.00093632005,0.10121521],"genre_scores_gemma":[0.7270017,0.0005566327,0.196572,0.00020287123,0.00019211989,0.0016131889,0.0008268944,0.00019538928,0.07283923],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9954432,0.0011839642,0.00037308168,0.001023695,0.0014263804,0.00054961187],"domain_scores_gemma":[0.99593544,0.0012327239,0.00041198387,0.0010758146,0.0007721015,0.00057199254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028825116,0.0008262966,0.0007791244,0.0013579929,0.0022294098,0.0060545597,0.0027557125,0.0024229854,0.016701171],"category_scores_gemma":[0.006472747,0.00049572374,0.0010939222,0.0017716317,0.0032527822,0.008347683,0.004682858,0.001453134,0.005019747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010964386,0.00011943501,0.00070162734,0.00005345037,0.000026963693,0.0004545431,0.0012035014,0.07041895,0.0006273065,0.8993825,0.0032752238,0.02362674],"study_design_scores_gemma":[0.00025676892,0.000106955886,0.00033937584,0.00004177379,0.000033058208,0.00028754864,0.0007296885,0.45896846,0.00066196156,0.4976227,0.040915083,0.000036687597],"about_ca_topic_score_codex":0.0073960265,"about_ca_topic_score_gemma":0.003933191,"teacher_disagreement_score":0.016701171,"about_ca_system_score_codex":0.0026534307,"about_ca_system_score_gemma":0.0027455115,"threshold_uncertainty_score":0.05587095},"labels":[],"label_agreement":null},{"id":"W2062635160","doi":"10.13167/2013.6.7","title":"CONSTRUCTABILITY-BUILDABILITY-IZGRADIVOST","year":2013,"lang":"hr","type":"article","venue":"Elektronički časopis građevinskog fakulteta Osijek","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Constructability; Business; Engineering; Structural engineering","score_opus":0.006191138046828159,"score_gpt":0.19544669103340465,"score_spread":0.18925555298657648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062635160","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.079262905,0.008150394,0.21507902,0.0050856886,0.0012571717,0.00039115731,0.0004919983,0.0009688935,0.68931276],"genre_scores_gemma":[0.91736984,0.003076325,0.038064018,0.00079235266,0.00019366672,0.00030827007,0.00055096456,0.0002895163,0.03935508],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99495393,0.0010968143,0.0004625414,0.00079984294,0.0022290763,0.00045771277],"domain_scores_gemma":[0.99743927,0.0006745507,0.000326025,0.00063428143,0.0007607735,0.00016514487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003516556,0.0007612184,0.0005735043,0.0027397652,0.0021725728,0.0071435086,0.0007576448,0.0012161174,0.007821052],"category_scores_gemma":[0.0047922255,0.00032683933,0.00073000195,0.0019492806,0.010660792,0.0053980197,0.0051799044,0.0035060516,0.0019970255],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038468545,0.00004545164,0.0015637011,0.00021913044,0.000015514277,0.00016029738,0.0017518919,0.00075907796,0.0014191556,0.93355066,0.0018872927,0.058589473],"study_design_scores_gemma":[0.000039467217,0.0001805574,0.008186295,0.00064292806,0.000057512316,0.0014327709,0.0039868443,0.0023144067,0.0053563635,0.645496,0.332248,0.000058838963],"about_ca_topic_score_codex":0.0025938102,"about_ca_topic_score_gemma":0.0018727455,"teacher_disagreement_score":0.007821052,"about_ca_system_score_codex":0.0035282685,"about_ca_system_score_gemma":0.003574929,"threshold_uncertainty_score":0.026164055},"labels":[],"label_agreement":null},{"id":"W2062801531","doi":"10.1680/mpal.11.00049","title":"Simulation of scheduling logic using dynamic functions","year":2013,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Management Procurement and Law","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Critical path method; Probabilistic logic; Interdependence; Scheduling (production processes); Schedule; Dynamic priority scheduling; Function (biology); Mathematical optimization; Distributed computing; Systems engineering; Engineering; Artificial intelligence; Mathematics","score_opus":0.011204330017663227,"score_gpt":0.20484038485609066,"score_spread":0.19363605483842744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062801531","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2879903,0.00008510307,0.6970624,0.00014810622,0.000052258056,0.00012642128,0.0004165778,0.0011147093,0.013004228],"genre_scores_gemma":[0.9140495,0.00008720322,0.08287553,0.000027177766,0.0000075479365,0.00018579295,0.00022728815,0.000081420985,0.0024584979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99945563,0.00020324533,0.00003314274,0.0000805707,0.00013006224,0.00009732604],"domain_scores_gemma":[0.99805754,0.0013660281,0.00012649722,0.0001482878,0.00024214857,0.000059527767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089245394,0.0005754854,0.00035288712,0.0007226022,0.000382845,0.0008874138,0.00090155925,0.000590836,0.0032864362],"category_scores_gemma":[0.002657751,0.00029143866,0.0005620637,0.00049168227,0.00069971016,0.0007203305,0.00053788227,0.0005825587,0.0002092018],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047806683,0.000021477319,0.00047013766,0.000014036961,0.0000051388643,0.000023192219,0.000038982824,0.9881613,0.0010876638,0.007408781,0.00007031766,0.0026511555],"study_design_scores_gemma":[0.000005157724,0.000013624127,0.000050776373,0.0000016546297,0.0000021311394,0.0000040773803,0.000006107555,0.9978369,0.00072999985,0.0010847204,0.0002627235,0.0000020955993],"about_ca_topic_score_codex":0.007884036,"about_ca_topic_score_gemma":0.0038210968,"teacher_disagreement_score":0.007884036,"about_ca_system_score_codex":0.0011605778,"about_ca_system_score_gemma":0.0011570139,"threshold_uncertainty_score":0.01567626},"labels":[],"label_agreement":null},{"id":"W2062942589","doi":"10.1139/l07-058","title":"Monitoring of concrete building construction","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Council","keywords":"Structural engineering; Stress (linguistics); Reinforced concrete; Forensic engineering; Deformation (meteorology); Building construction; Geotechnical engineering; Environmental science; Engineering; Materials science; Composite material","score_opus":0.0059901814417033855,"score_gpt":0.18556352276156762,"score_spread":0.17957334131986424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2062942589","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9226312,0.00068636116,0.05980879,0.00006883168,0.000034749453,0.0001527287,0.0021663571,0.0013517553,0.013099201],"genre_scores_gemma":[0.9791555,0.00027255778,0.017847897,0.000013651902,0.000011866568,0.000037432746,0.0007167121,0.000023093206,0.0019212649],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99931085,0.00009026676,0.00002571339,0.00011619434,0.00040250528,0.0000544106],"domain_scores_gemma":[0.9993493,0.0000890443,0.00013686552,0.00006563862,0.00029233028,0.00006674658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040844188,0.00035199604,0.00027921094,0.0018060027,0.0002860607,0.00026502024,0.00035775354,0.00029460553,0.0010549714],"category_scores_gemma":[0.00085095887,0.0001366982,0.00013733683,0.0010609506,0.00014931525,0.00037087136,0.0003231517,0.00024642592,0.0003925577],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027049237,0.00018091548,0.32749364,0.00040486388,0.00007839682,0.00040035738,0.00081808,0.008082201,0.3758004,0.0006714912,0.0019814488,0.2838177],"study_design_scores_gemma":[0.000017447706,0.00054844347,0.7887407,0.000063878535,0.000069941074,0.0011459151,0.00058257085,0.02971487,0.16907,0.00044258873,0.009527007,0.0000766734],"about_ca_topic_score_codex":0.003478087,"about_ca_topic_score_gemma":0.0077617443,"teacher_disagreement_score":0.003478087,"about_ca_system_score_codex":0.0002680948,"about_ca_system_score_gemma":0.0003953245,"threshold_uncertainty_score":0.0069156885},"labels":[],"label_agreement":null},{"id":"W2064272282","doi":"10.4015/s1016237207000446","title":"APPLICATION OF RELEVANT CONSTRUCTION REGULATIONS FOR AN ERGONOMICAL AND SAFE WORK ENVIRONMENT","year":2007,"lang":"en","type":"article","venue":"Biomedical Engineering Applications Basis and Communications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"British Columbia Institute of Technology","funders":"","keywords":"Work (physics); Working environment; Architectural engineering; Productivity; Occupational safety and health; Work environment; Foundation (evidence); Engineering; Risk analysis (engineering); Business; Law; Mechanical engineering; Political science","score_opus":0.008494541129778379,"score_gpt":0.21369047794576235,"score_spread":0.20519593681598397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2064272282","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08515619,0.006189922,0.24888298,0.024510685,0.00320455,0.0033912119,0.0014790616,0.0015149958,0.6256703],"genre_scores_gemma":[0.54131067,0.005159506,0.31909204,0.010534193,0.0011325675,0.0064835157,0.001981833,0.00054580567,0.11375994],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9568035,0.008931444,0.0053535546,0.0013895098,0.02535409,0.0021678957],"domain_scores_gemma":[0.9619626,0.0105546275,0.0044877143,0.0049307086,0.017265197,0.0007992274],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017578457,0.0006789089,0.0005937005,0.0018961944,0.0040903827,0.0048450786,0.002053722,0.004612737,0.0034492544],"category_scores_gemma":[0.03413505,0.0006670102,0.0008159847,0.0011251738,0.0047159935,0.0015833639,0.002705555,0.0032396151,0.0020861567],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013902505,0.0009914542,0.015190407,0.0015990238,0.00003811049,0.001170017,0.016413879,0.008286277,0.021016175,0.70560056,0.06987507,0.15968001],"study_design_scores_gemma":[0.000054976983,0.00039441447,0.034305695,0.0025326968,0.000080903,0.0012281833,0.004619943,0.0028744426,0.011924179,0.04818135,0.89353484,0.00026828866],"about_ca_topic_score_codex":0.012244792,"about_ca_topic_score_gemma":0.014744434,"teacher_disagreement_score":0.017578457,"about_ca_system_score_codex":0.0030791014,"about_ca_system_score_gemma":0.022591256,"threshold_uncertainty_score":0.09296483},"labels":[],"label_agreement":null},{"id":"W2065594418","doi":"10.1061/(asce)0887-3801(2010)24:2(203)","title":"Automated Code Compliance Checking for Building Envelope Design","year":2010,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":139,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Envelope (radar); Building code; Building envelope; Building design; Computer science; Code (set theory); Representation (politics); Process (computing); Building information modeling; Software; Building model; Software engineering; Engineering; Programming language; Architectural engineering; Simulation; Set (abstract data type)","score_opus":0.022570997127181008,"score_gpt":0.2565851507594705,"score_spread":0.23401415363228953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2065594418","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032383904,0.00011052693,0.9463596,0.000096976946,0.00002558417,0.0002486652,0.00022536659,0.017337486,0.0032119406],"genre_scores_gemma":[0.39803526,0.00011804449,0.5973414,0.00007275625,0.000015448712,0.00029904686,0.001208764,0.000892904,0.0020164058],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99194884,0.0030417712,0.00054811256,0.0006431853,0.0035352951,0.00028277075],"domain_scores_gemma":[0.98741525,0.005218765,0.001245486,0.003769078,0.0022130636,0.00013840714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036500583,0.0007363917,0.00067374826,0.002366305,0.0008013506,0.0016913571,0.0012408149,0.000749829,0.0030593085],"category_scores_gemma":[0.016457219,0.0005535437,0.00079899945,0.0011394911,0.0011318373,0.0018158504,0.0018561727,0.0008292521,0.00108736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006712934,0.00044287412,0.007134707,0.0004811908,0.00013450289,0.0006687608,0.0011793601,0.19655308,0.052210115,0.058523707,0.009645704,0.6723546],"study_design_scores_gemma":[0.00008491692,0.000129654,0.0013587174,0.00012070568,0.000043551827,0.00025917657,0.0001478931,0.88261175,0.075603776,0.023748761,0.015822347,0.00006871426],"about_ca_topic_score_codex":0.003972445,"about_ca_topic_score_gemma":0.0031568964,"teacher_disagreement_score":0.003972445,"about_ca_system_score_codex":0.0010075455,"about_ca_system_score_gemma":0.0029163144,"threshold_uncertainty_score":0.01930356},"labels":[],"label_agreement":null},{"id":"W2066517487","doi":"10.1061/41098(368)113","title":"Rapid Pier Delivery Using Precast Concrete Components","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Vancouver Coastal Health","funders":"","keywords":"Pier; Precast concrete; Engineering; Schedule; Civil engineering; Computer science","score_opus":0.017835412807951468,"score_gpt":0.20028754108900057,"score_spread":0.1824521282810491,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066517487","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20003565,0.00042551948,0.616718,0.00043430252,0.0005041794,0.0019399561,0.00067723164,0.01622766,0.16303758],"genre_scores_gemma":[0.5286684,0.0005044552,0.34993035,0.00013716602,0.00005295786,0.00041523736,0.0010327756,0.0014160296,0.11784274],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987847,0.00005042976,0.000034463847,0.00007936105,0.0009210615,0.0001299758],"domain_scores_gemma":[0.9992028,0.000085744636,0.00009591603,0.00019416283,0.00029147102,0.00012991145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006794747,0.00089822896,0.00029355107,0.0011694011,0.0005140339,0.0008374853,0.0012056511,0.00051876984,0.024233827],"category_scores_gemma":[0.0013306458,0.00078779616,0.0004051698,0.00054893974,0.00037498772,0.00089066965,0.0015655705,0.0012427168,0.010893132],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037974116,0.00040895503,0.003354219,0.00066390395,0.000030062669,0.0022415842,0.0009785222,0.035653505,0.47814497,0.02311402,0.020192705,0.43483776],"study_design_scores_gemma":[0.00014349716,0.0024129036,0.008405204,0.00018998867,0.00005345167,0.0030651344,0.00067636,0.053013075,0.5836255,0.0033783899,0.34487915,0.00015735149],"about_ca_topic_score_codex":0.0013036384,"about_ca_topic_score_gemma":0.004040274,"teacher_disagreement_score":0.024233827,"about_ca_system_score_codex":0.0006054305,"about_ca_system_score_gemma":0.0017364126,"threshold_uncertainty_score":0.081070185},"labels":[],"label_agreement":null},{"id":"W2066635672","doi":"10.1061/(asce)co.1943-7862.0000907","title":"Identification of Invariant Average Weighted Haul Distance to Simplify Earthmoving Simulation Modeling in Planning Site Grading Operations","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Grid; Grading (engineering); Computer science; Heuristic; Simulation modeling; Industrial engineering; Simulation; Data mining; Operations research; Engineering; Artificial intelligence; Mathematics; Civil engineering","score_opus":0.007575520161491659,"score_gpt":0.20808722381658107,"score_spread":0.2005117036550894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066635672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.056141075,0.0000457617,0.941559,0.000030134894,0.000014140762,0.00005412871,0.000029024062,0.00013824584,0.0019884955],"genre_scores_gemma":[0.8068275,0.000090024485,0.19229269,0.000011402176,0.000006473806,0.000087976485,0.000058715686,0.000051645904,0.0005736114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934214,0.00025603923,0.000042546784,0.00010016997,0.00019929519,0.0000597535],"domain_scores_gemma":[0.9985097,0.0007907517,0.00021979521,0.0001993804,0.00021933559,0.000060916936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013248503,0.0005208781,0.0006658568,0.0006167908,0.00036101262,0.0011322313,0.0010570735,0.0004934387,0.0008726706],"category_scores_gemma":[0.0035524652,0.00040614078,0.00059471314,0.00071940373,0.00059881544,0.0011978386,0.0009725022,0.00076596934,0.00015458092],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018257984,0.00002397169,0.0011203886,0.00001840608,0.0000075953103,0.000022506072,0.000029192288,0.9785942,0.0012424234,0.0054498683,0.000059913546,0.01341328],"study_design_scores_gemma":[0.0000012437173,0.000011130767,0.00014377858,0.0000016736587,0.0000018922636,0.000004837187,0.0000068115223,0.9986797,0.000404955,0.0005854387,0.00015592198,0.0000026187208],"about_ca_topic_score_codex":0.008516093,"about_ca_topic_score_gemma":0.0064452956,"teacher_disagreement_score":0.008516093,"about_ca_system_score_codex":0.0008894492,"about_ca_system_score_gemma":0.0014159967,"threshold_uncertainty_score":0.016933084},"labels":[],"label_agreement":null},{"id":"W2066650466","doi":"10.1016/j.protcy.2014.10.127","title":"Building Information Modeling Implementation through Maturity Evaluation and Critical Success Factors Management","year":2014,"lang":"en","type":"article","venue":"Procedia Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Maturity (psychological); Building information modeling; Capability Maturity Model; Critical success factor; Engineering; Process management; Computer science; Knowledge management; Engineering management; Systems engineering; Operations management","score_opus":0.012447094419317703,"score_gpt":0.2925543820750289,"score_spread":0.2801072876557112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2066650466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59022176,0.0006287063,0.37515873,0.0010963433,0.000040663912,0.00294979,0.00043659622,0.00083235267,0.028635057],"genre_scores_gemma":[0.7949158,0.0002554424,0.20198976,0.00002173991,0.000007968659,0.001134504,0.0003993052,0.000056918736,0.001218677],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9813726,0.008394712,0.0015498836,0.0010253367,0.0064806943,0.0011768425],"domain_scores_gemma":[0.9487179,0.022083806,0.0065458277,0.0021337387,0.01913931,0.0013793944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02735069,0.0012517065,0.0006273591,0.010284985,0.0010959253,0.004960882,0.0011065982,0.0008541633,0.0019529224],"category_scores_gemma":[0.050589945,0.00044257738,0.0008453936,0.0056790314,0.0009497817,0.0050770207,0.002501153,0.0010893283,0.0004832959],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005398902,0.0013842748,0.18782671,0.0012982752,0.00022216591,0.00040423663,0.017849388,0.030228663,0.012384926,0.07726942,0.002724344,0.6678677],"study_design_scores_gemma":[0.000166643,0.003981935,0.19390386,0.0020543656,0.00074082246,0.0005065981,0.048862994,0.5860498,0.06474599,0.06093494,0.037464656,0.00058741646],"about_ca_topic_score_codex":0.0058078268,"about_ca_topic_score_gemma":0.0046050805,"teacher_disagreement_score":0.02735069,"about_ca_system_score_codex":0.005779334,"about_ca_system_score_gemma":0.008012748,"threshold_uncertainty_score":0.14464605},"labels":[],"label_agreement":null},{"id":"W2067302756","doi":"10.1139/l02-030","title":"Computer-assisted construction methods knowledge management and selection","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Computer science; Construction management; Building information modeling; Key (lock); Context (archaeology); Project management; Automation; Systems engineering; Domain (mathematical analysis); Domain knowledge; Software engineering; Engineering management; Scheduling (production processes); Engineering; Database","score_opus":0.011122516540374898,"score_gpt":0.20464216745555233,"score_spread":0.19351965091517742,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067302756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003627946,0.00045763946,0.96910065,0.00041104972,0.00004653583,0.00063417753,0.0004503679,0.001790245,0.023481496],"genre_scores_gemma":[0.06904337,0.00075897237,0.9096173,0.00015246708,0.00006074144,0.0010186019,0.0013284757,0.00019516259,0.017824965],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9962243,0.0012299527,0.00025035042,0.0005040418,0.0016287746,0.00016262174],"domain_scores_gemma":[0.99580956,0.0022250873,0.00019598508,0.0006877532,0.0009344986,0.00014709587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040867943,0.0006252141,0.0008838253,0.0041997023,0.0014457399,0.0049344394,0.0025110669,0.00082982995,0.020848384],"category_scores_gemma":[0.007972872,0.0003923504,0.0008621575,0.0038060416,0.0013092059,0.002727852,0.0023561488,0.0008335928,0.0036354442],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010954098,0.00015181306,0.0011376755,0.00038178088,0.000059255457,0.00018685244,0.00093833485,0.014322834,0.0021137767,0.111528836,0.020055281,0.849014],"study_design_scores_gemma":[0.00026143808,0.00014999359,0.0027906166,0.00048245472,0.000112327696,0.0007685797,0.0014786553,0.2425958,0.010662412,0.27497467,0.46559322,0.00012989966],"about_ca_topic_score_codex":0.0064131394,"about_ca_topic_score_gemma":0.00930195,"teacher_disagreement_score":0.020848384,"about_ca_system_score_codex":0.0015018171,"about_ca_system_score_gemma":0.0037679027,"threshold_uncertainty_score":0.069744825},"labels":[],"label_agreement":null},{"id":"W2067503067","doi":"10.3763/aedm.2010.idds1","title":"Challenges for Integrated Design and Delivery Solutions","year":2010,"lang":"en","type":"article","venue":"Architectural Engineering and Design Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":109,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Interoperability; Process (computing); Bridge (graph theory); Knowledge management; Workforce; Engineering; Process management; Integrated project delivery; Engineering management; Isolation (microbiology); Systems engineering; Project management; Computer science","score_opus":0.022808098381623735,"score_gpt":0.194623944328585,"score_spread":0.17181584594696128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067503067","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019717703,0.016626293,0.34437236,0.44358006,0.0027845148,0.00055415626,0.00025041998,0.0013971542,0.17071734],"genre_scores_gemma":[0.39805982,0.01567272,0.50157416,0.030961173,0.0019694425,0.0020146722,0.00091024506,0.00057980133,0.048257906],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9653184,0.014891631,0.0023479927,0.0026047092,0.011868749,0.00296856],"domain_scores_gemma":[0.9670192,0.012762406,0.0018115455,0.0043452946,0.010384371,0.0036772364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0507648,0.0012036075,0.0013516505,0.0024990304,0.0036819149,0.020893248,0.0068763164,0.012991673,0.013175818],"category_scores_gemma":[0.039892,0.001087745,0.0016599497,0.002262893,0.0073409704,0.023284603,0.015673386,0.008858292,0.005213252],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040721097,0.0003038861,0.00074859103,0.00064161624,0.00007166294,0.00019533024,0.0024716596,0.008928448,0.0009379331,0.77975535,0.037785426,0.16811946],"study_design_scores_gemma":[0.00006562102,0.00014532664,0.00052170287,0.0007741236,0.00004126252,0.0002843288,0.007813914,0.013417107,0.0005745824,0.59248227,0.38382158,0.00005818287],"about_ca_topic_score_codex":0.004075248,"about_ca_topic_score_gemma":0.0017978374,"teacher_disagreement_score":0.0507648,"about_ca_system_score_codex":0.008168339,"about_ca_system_score_gemma":0.02447355,"threshold_uncertainty_score":0.26847315},"labels":[],"label_agreement":null},{"id":"W2067740563","doi":"10.5539/mas.v5n4p123","title":"Development of Production Rates Database for Substructure Activities by Work Sampling","year":2011,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Database; Production (economics); Sampling (signal processing); Work (physics); Duration (music); Scheduling (production processes); Statistics; Operations management; Mathematics; Engineering","score_opus":0.03904838676862325,"score_gpt":0.23481465772881505,"score_spread":0.19576627096019178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2067740563","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25061637,0.000607686,0.48292467,0.0002533082,0.00018760929,0.008410243,0.2097088,0.014339175,0.032952145],"genre_scores_gemma":[0.24576415,0.0005305184,0.5565213,0.00005491664,0.00007022431,0.011633555,0.17754929,0.00057126686,0.0073048417],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9930949,0.0010177303,0.0022529862,0.00091078057,0.0025015983,0.00022200006],"domain_scores_gemma":[0.97653484,0.006329514,0.003462184,0.0040894994,0.00901114,0.0005728695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0066376003,0.00079010683,0.0009850928,0.012110992,0.00056126574,0.0017352691,0.0016710033,0.00062499335,0.004720286],"category_scores_gemma":[0.019527111,0.00059332803,0.00071393274,0.008711002,0.00020231666,0.0019794737,0.0010418543,0.00076266046,0.0034014357],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008431804,0.0010518542,0.15691774,0.0015402983,0.00012301058,0.00045587725,0.002657106,0.0124192415,0.010715093,0.00632114,0.032088228,0.7748673],"study_design_scores_gemma":[0.00024795448,0.0013947327,0.50842744,0.0007943613,0.0002956268,0.0013563462,0.004305566,0.09609972,0.054913405,0.0070751654,0.3246301,0.00045963805],"about_ca_topic_score_codex":0.0053858063,"about_ca_topic_score_gemma":0.0049272147,"teacher_disagreement_score":0.012110992,"about_ca_system_score_codex":0.0012848342,"about_ca_system_score_gemma":0.0018725645,"threshold_uncertainty_score":0.03510344},"labels":[],"label_agreement":null},{"id":"W2068600822","doi":"10.1139/l08-083","title":"Geographic information system–based visualization system for planning and monitoring of repetitive construction projects","year":2008,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visualization; Schedule; Geographic information system; Computer science; Pipeline (software); Systems engineering; Information system; Representation (politics); Software engineering; Engineering; Data mining; Geography; Cartography","score_opus":0.008442333832449469,"score_gpt":0.18271228440431966,"score_spread":0.1742699505718702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068600822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024427127,0.0004988795,0.8898569,0.0004701697,0.00015514344,0.00034281047,0.0037701565,0.06744014,0.013038717],"genre_scores_gemma":[0.2819282,0.00080100016,0.70313567,0.0001506797,0.000101184334,0.00064465374,0.006169754,0.0015238972,0.005544999],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994123,0.00018736083,0.000052914118,0.00012277736,0.00018879106,0.000035852412],"domain_scores_gemma":[0.99841297,0.00041192857,0.00014708741,0.0003810416,0.0005009615,0.00014593164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012319625,0.0006918477,0.0007032298,0.0030494884,0.0006273492,0.0013226211,0.0012893798,0.00070631,0.009712392],"category_scores_gemma":[0.0022563653,0.00046537427,0.00042938525,0.0026380096,0.0002585304,0.0016291304,0.001112301,0.00069710007,0.002529673],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00076399324,0.00038720947,0.0080186585,0.0006950455,0.00022498814,0.00067185966,0.0016582736,0.050418235,0.045383755,0.020019706,0.0904536,0.7813047],"study_design_scores_gemma":[0.0003382829,0.00038693368,0.01700587,0.0002731164,0.00030053174,0.00097803,0.00066760764,0.5592723,0.046326168,0.013721144,0.3603329,0.00039721603],"about_ca_topic_score_codex":0.0049676728,"about_ca_topic_score_gemma":0.0056528174,"teacher_disagreement_score":0.009712392,"about_ca_system_score_codex":0.00056936033,"about_ca_system_score_gemma":0.0012672987,"threshold_uncertainty_score":0.032491207},"labels":[],"label_agreement":null},{"id":"W2068765329","doi":"10.1016/j.aei.2008.05.003","title":"IT-based approach for effective management of project changes: A change management system (CMS)","year":2008,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Control (management); Project management; Knowledge base; Selection (genetic algorithm); Knowledge management; Project management triangle; Change control; Computer science; Engineering; Process management; Project planning; Risk analysis (engineering); Engineering management; Systems engineering; Business; Artificial intelligence","score_opus":0.014111106241306666,"score_gpt":0.20906966946286737,"score_spread":0.19495856322156072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2068765329","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11760272,0.00055415527,0.7436821,0.0041796663,0.00072678714,0.0014010225,0.0008157134,0.033181295,0.0978567],"genre_scores_gemma":[0.4724453,0.0003711752,0.504519,0.0011450875,0.0002348541,0.00065275584,0.00093210046,0.00048353715,0.019216161],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99768436,0.0006319061,0.00022842358,0.00028118133,0.0010368038,0.00013721037],"domain_scores_gemma":[0.99660516,0.00080998725,0.00037232507,0.0006514324,0.0010532618,0.00050793873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024237484,0.00039890438,0.00038630716,0.00209875,0.0010332168,0.0030939318,0.0009522417,0.00086639484,0.007290582],"category_scores_gemma":[0.0037790218,0.0002478496,0.00036140188,0.002218089,0.0005241892,0.0021027306,0.001588957,0.00091028976,0.0020892078],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029772636,0.0012471314,0.008850856,0.00026770864,0.00009126822,0.00039004828,0.0015827826,0.007058809,0.025618397,0.029124178,0.03490223,0.89056885],"study_design_scores_gemma":[0.000697941,0.0019835406,0.048877884,0.00059515133,0.0006358123,0.0018622777,0.0021479365,0.34931543,0.06197602,0.039039403,0.49248844,0.0003801779],"about_ca_topic_score_codex":0.002669614,"about_ca_topic_score_gemma":0.003578857,"teacher_disagreement_score":0.007290582,"about_ca_system_score_codex":0.0012563511,"about_ca_system_score_gemma":0.003166161,"threshold_uncertainty_score":0.024389386},"labels":[],"label_agreement":null},{"id":"W2070160092","doi":"10.1115/jrc2014-3750","title":"Validation of the Accessible Lavatory Recommendations for the Next Generation of Accessible Passenger Rail Cars","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Computer science; Work (physics); Scale (ratio); Engineering","score_opus":0.07397941889198047,"score_gpt":0.273512157439299,"score_spread":0.19953273854731857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2070160092","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15725768,0.0010802797,0.6542329,0.004138901,0.001273229,0.0050418167,0.010772474,0.005731255,0.16047151],"genre_scores_gemma":[0.43975484,0.0019345506,0.4486758,0.0010767869,0.00012998086,0.0052481005,0.026419638,0.0023135243,0.074446835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.97178155,0.00565526,0.002070094,0.0012069513,0.018039692,0.0012465557],"domain_scores_gemma":[0.94644743,0.0065584253,0.002320362,0.006673335,0.037140917,0.000859477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021175766,0.0015504771,0.00094827206,0.0025124312,0.0011904576,0.00410033,0.0054053133,0.0025401856,0.00929281],"category_scores_gemma":[0.044585653,0.0011751871,0.0019085057,0.00084668596,0.0012416702,0.0037228828,0.0029953541,0.0028323655,0.0048699514],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00076165266,0.0009577608,0.022997232,0.0021263475,0.00016281908,0.0010186189,0.005094858,0.38448644,0.066535786,0.09270332,0.1258459,0.29730937],"study_design_scores_gemma":[0.00023804097,0.0024030982,0.023197897,0.002907709,0.0003437434,0.00060759985,0.005696107,0.16894998,0.09697851,0.016746122,0.6813677,0.0005635206],"about_ca_topic_score_codex":0.036657903,"about_ca_topic_score_gemma":0.033143125,"teacher_disagreement_score":0.036657903,"about_ca_system_score_codex":0.0040398464,"about_ca_system_score_gemma":0.010099765,"threshold_uncertainty_score":0.1119895},"labels":[],"label_agreement":null},{"id":"W2071095200","doi":"10.1108/09699980910970851","title":"Integrating numerical tools in underground construction process","year":2009,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Process (computing); Frame (networking); Reduction (mathematics); Computer science; Cost reduction; Pre-construction services; Construction management; Quality (philosophy); Excavation; Control (management); Industrial engineering; Project management; Construction engineering; Systems engineering; Engineering; Civil engineering; Project planning","score_opus":0.006681775821354997,"score_gpt":0.21145156237560617,"score_spread":0.20476978655425118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2071095200","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10521859,0.00027864793,0.8784444,0.00022816769,0.00002986032,0.0001224648,0.00004677687,0.0005875065,0.015043508],"genre_scores_gemma":[0.68889827,0.00031541724,0.30895126,0.000020773174,0.000008501392,0.00010061794,0.000039947703,0.00008700087,0.0015782757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99833554,0.0007173551,0.00010114317,0.00015820238,0.0006005879,0.00008723062],"domain_scores_gemma":[0.9967809,0.0019715535,0.00035968542,0.00047332497,0.0003632689,0.00005124698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016706175,0.00045927175,0.00039807038,0.0009363676,0.0006731062,0.0016305145,0.00062731985,0.0004874922,0.0027545504],"category_scores_gemma":[0.005251719,0.0003994158,0.00039399412,0.0011078618,0.00137349,0.0011046113,0.001485914,0.00047376327,0.0004897831],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018540374,0.00018230108,0.011799892,0.00047952222,0.00003486059,0.00044385385,0.0013856088,0.6953066,0.019041339,0.066672474,0.00051271403,0.20395537],"study_design_scores_gemma":[0.000036092377,0.00013199676,0.0041489652,0.00012592731,0.0000392381,0.00038584854,0.00073814014,0.93078285,0.01374613,0.030798279,0.019017896,0.00004856241],"about_ca_topic_score_codex":0.0048487335,"about_ca_topic_score_gemma":0.0039466606,"teacher_disagreement_score":0.0048487335,"about_ca_system_score_codex":0.0009773718,"about_ca_system_score_gemma":0.0021974307,"threshold_uncertainty_score":0.009640992},"labels":[],"label_agreement":null},{"id":"W2072049602","doi":"10.1139/l00-075","title":"A fuzzy expert system for design performance prediction and evaluation","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Fuzzy logic; Expert system; Computer science; Key (lock); Data mining; Context (archaeology); Machine learning; Measure (data warehouse); Artificial intelligence; Industrial engineering; Engineering","score_opus":0.01601565219101328,"score_gpt":0.191659534505783,"score_spread":0.1756438823147697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072049602","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0049549295,0.00018506205,0.9878076,0.00009135219,0.0000480326,0.00025625096,0.00031396496,0.0019573562,0.004385528],"genre_scores_gemma":[0.12734269,0.0003221147,0.86554253,0.000086494496,0.000048651622,0.0007455939,0.0008143442,0.00011061337,0.004987084],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99751866,0.00072191464,0.00022672549,0.00027466196,0.0011589368,0.00009911121],"domain_scores_gemma":[0.9973609,0.0010782537,0.00013908868,0.00022892166,0.001117114,0.00007572138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003604377,0.0008936649,0.0012044143,0.0019065014,0.00084128405,0.0017078983,0.0014428818,0.0014167238,0.006168834],"category_scores_gemma":[0.0086332625,0.00036486285,0.0006558904,0.000995827,0.0003817871,0.0012866344,0.0009465164,0.0010593149,0.0025123274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035195716,0.00023568768,0.0022056624,0.0005296774,0.00011796882,0.00028998125,0.00042511345,0.21583469,0.01675684,0.01969529,0.01239661,0.7311606],"study_design_scores_gemma":[0.000085640604,0.00014898628,0.00090287614,0.000112549154,0.00006315929,0.0001626944,0.000067884335,0.9570316,0.0076558646,0.011687034,0.022012385,0.00006925393],"about_ca_topic_score_codex":0.006366662,"about_ca_topic_score_gemma":0.005437029,"teacher_disagreement_score":0.006366662,"about_ca_system_score_codex":0.0010421402,"about_ca_system_score_gemma":0.001732181,"threshold_uncertainty_score":0.020636857},"labels":[],"label_agreement":null},{"id":"W2072631216","doi":"10.1016/j.aei.2007.03.003","title":"A geometric modelling framework for conceptual structural design from early digital architectural models","year":2007,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":58,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Process (computing); Conceptual design; Representation (politics); Architectural geometry; Computer science; Design process; Conceptual model; Systems engineering; Architectural technology; Hierarchy; Interdependence; Software engineering; Architecture; Engineering; Work in process; Software; Software development; Human–computer interaction; Programming language; Database","score_opus":0.016351385556920506,"score_gpt":0.2081436789079392,"score_spread":0.1917922933510187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072631216","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005179025,0.0001027559,0.9967579,0.00006676399,0.000018593448,0.00002855971,0.00009467635,0.0002862285,0.0021265836],"genre_scores_gemma":[0.028326638,0.00047668707,0.9670671,0.00005443254,0.000028802078,0.0001648952,0.0008281905,0.00026517746,0.0027879963],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993436,0.00012758389,0.00007615244,0.000101089485,0.0003104977,0.00004116477],"domain_scores_gemma":[0.9994535,0.00015566646,0.000040370935,0.00014602204,0.00017874756,0.000025696445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001350567,0.0010681282,0.0007508744,0.0026175515,0.0011079499,0.0038953421,0.0029927036,0.0013132684,0.0057542147],"category_scores_gemma":[0.0024039655,0.0010406531,0.001982131,0.0025175477,0.002131431,0.0025687157,0.0026506924,0.0020760351,0.00296859],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000110501205,0.000025432697,0.00016364563,0.0001612478,0.000020815885,0.0001645527,0.00046952875,0.06570372,0.0023043142,0.8623603,0.002571088,0.06604433],"study_design_scores_gemma":[0.000013792504,0.000029971945,0.00023804966,0.00016807951,0.000047000787,0.00023256238,0.00020726807,0.30415606,0.002543065,0.561808,0.13051617,0.00003997176],"about_ca_topic_score_codex":0.008353203,"about_ca_topic_score_gemma":0.014222633,"teacher_disagreement_score":0.008353203,"about_ca_system_score_codex":0.0012129373,"about_ca_system_score_gemma":0.0017646066,"threshold_uncertainty_score":0.019249737},"labels":[],"label_agreement":null},{"id":"W2072810478","doi":"10.3846/13923730.2011.574343","title":"APPLICATION OF NEW INFORMATION TECHNOLOGY ON CONCRETE: AN OVERVIEW / NAUJŲ INFORMACINIŲ TECHNOLOGIJŲ NAUDOJIMAS RUOŠIANT BETONĄ. APŽVALGA","year":2011,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Information technology; Variety (cybernetics); Computer science; Liquid desiccant; Engineering; Artificial intelligence; Mechanical engineering; Air conditioning","score_opus":0.011239761826034601,"score_gpt":0.20237907764385163,"score_spread":0.19113931581781704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2072810478","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021776638,0.9672094,0.0060897777,0.002667698,0.0006664581,0.000030389429,0.0000512103,0.0000667159,0.021040635],"genre_scores_gemma":[0.013094013,0.9662189,0.009188566,0.00070289307,0.0008218014,0.00004242523,0.00016615202,0.000031074975,0.009734287],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99890053,0.0002296381,0.00012081923,0.00016790479,0.0004932117,0.00008779239],"domain_scores_gemma":[0.9986413,0.0007890561,0.00010830402,0.00006479469,0.00030765237,0.00008892065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010828406,0.0005148263,0.00057885895,0.0061153485,0.00064894446,0.004367088,0.00065840053,0.0016440715,0.004790432],"category_scores_gemma":[0.0011339686,0.0004808226,0.00050035375,0.006682762,0.0011827676,0.0051294975,0.001290155,0.0014323266,0.001808078],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004650457,0.000105926665,0.001601278,0.0062966337,0.00005431338,0.00057784625,0.0011708476,0.00076147355,0.0026514493,0.05043592,0.022227447,0.9140704],"study_design_scores_gemma":[0.0000034933496,0.00006394722,0.0025879147,0.003473287,0.00004319662,0.0013992375,0.00074919255,0.0005844536,0.0012161784,0.010538359,0.9792986,0.000042009422],"about_ca_topic_score_codex":0.001725033,"about_ca_topic_score_gemma":0.001702447,"teacher_disagreement_score":0.0061153485,"about_ca_system_score_codex":0.0015146472,"about_ca_system_score_gemma":0.0019116738,"threshold_uncertainty_score":0.016025543},"labels":[],"label_agreement":null},{"id":"W2073954953","doi":"10.1139/l07-029","title":"Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Truck; Decision support system; Computer science; Software; Key (lock); Tracking (education); Discrete event simulation; Tracking system; Simulation software; Event (particle physics); Real-time computing; Simulation; Engineering; Artificial intelligence","score_opus":0.007138230938801997,"score_gpt":0.2180601060527754,"score_spread":0.2109218751139734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2073954953","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05224456,0.00006175542,0.9418591,0.000088088294,0.000021543283,0.000077216,0.00013132318,0.002446153,0.003070171],"genre_scores_gemma":[0.6027832,0.00016061787,0.39406347,0.000029306395,0.000012485579,0.0002012086,0.0003075365,0.00011102093,0.0023311255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977607,0.00006832975,0.000019167486,0.000042963504,0.0000699404,0.000023450053],"domain_scores_gemma":[0.9994425,0.00032235205,0.000051770534,0.000053571854,0.00009179562,0.000037986578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062141236,0.00059455785,0.0004945252,0.0003714906,0.00029347997,0.0006637163,0.00059792463,0.0003866114,0.0026207878],"category_scores_gemma":[0.0014309209,0.0003538307,0.00035556537,0.0003728772,0.00036326234,0.00058161304,0.0004887578,0.0004465479,0.00036583177],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001286344,0.000056573368,0.0013369957,0.000054415472,0.000027195581,0.00007226652,0.000070439004,0.9364604,0.0046100933,0.0040048454,0.0006905535,0.052487656],"study_design_scores_gemma":[0.00001722308,0.0000187587,0.00015104344,0.0000044339004,0.0000063101957,0.000009601238,0.000008405305,0.99596655,0.0021369613,0.00064412627,0.0010314181,0.000005233816],"about_ca_topic_score_codex":0.01497305,"about_ca_topic_score_gemma":0.013968137,"teacher_disagreement_score":0.01497305,"about_ca_system_score_codex":0.00071828056,"about_ca_system_score_gemma":0.0016879395,"threshold_uncertainty_score":0.029771805},"labels":[],"label_agreement":null},{"id":"W2077325571","doi":"10.1504/ijspm.2010.032658","title":"SPS tools for capital project planning analysis","year":2010,"lang":"en","type":"article","venue":"International Journal of Simulation and Process Modelling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Restructuring; Duration (music); Planner; Operations research; Capital (architecture); Scale (ratio); Engineering; Computer science; Transport engineering; Business; Finance; Artificial intelligence","score_opus":0.0397510319046815,"score_gpt":0.3270855069535241,"score_spread":0.28733447504884263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077325571","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017321563,0.000041104824,0.98522085,0.00005284728,0.000022707147,0.00008706041,0.0005740784,0.007849094,0.004420064],"genre_scores_gemma":[0.06686574,0.00032430433,0.92319137,0.00006674274,0.000029258914,0.0007706033,0.0031942462,0.0022747752,0.0032829114],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867177,0.00043045395,0.00019492752,0.000120581404,0.00051104167,0.00007124317],"domain_scores_gemma":[0.99588436,0.0025068517,0.00021621358,0.0007520953,0.00053574244,0.000104730294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021666877,0.0014029819,0.00088958483,0.0018812224,0.0004959291,0.0020330865,0.0019884752,0.00082194916,0.019316986],"category_scores_gemma":[0.0073748543,0.0012405573,0.0020753597,0.0016917943,0.00056477886,0.0018682665,0.0021812816,0.0015022748,0.006617715],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011251643,0.0001239872,0.0017711822,0.00054226763,0.00012443,0.00043331872,0.0006212488,0.69225496,0.0032033129,0.077962495,0.017339995,0.20551032],"study_design_scores_gemma":[0.000036853944,0.000028351264,0.00021642362,0.00013017016,0.000027677634,0.00016996343,0.00010952011,0.8994124,0.002616801,0.041927006,0.055295523,0.000029241495],"about_ca_topic_score_codex":0.0035632302,"about_ca_topic_score_gemma":0.0038808081,"teacher_disagreement_score":0.019316986,"about_ca_system_score_codex":0.0007946369,"about_ca_system_score_gemma":0.0015658888,"threshold_uncertainty_score":0.064621806},"labels":[],"label_agreement":null},{"id":"W2077547847","doi":"10.1061/41109(373)36","title":"Spatial Trajectory Analysis for Cranes Operations on Construction Sites","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Trajectory; Lift (data mining); Object (grammar); Computer science; Position (finance); Process (computing); Boom; Path (computing); Point (geometry); Set (abstract data type); Mathematics; Artificial intelligence; Engineering; Data mining; Geometry","score_opus":0.008653787106465183,"score_gpt":0.2145366242066289,"score_spread":0.2058828371001637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2077547847","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.111122146,0.00017645313,0.88245976,0.000096721626,0.000012805196,0.00006096516,0.00022204842,0.00027508166,0.005573998],"genre_scores_gemma":[0.884057,0.00035931685,0.110004924,0.00001020532,0.0000074835016,0.00010032456,0.0003202906,0.00008878132,0.005051687],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999861,0.000028930648,0.000005916456,0.00002088416,0.00006555984,0.000017627515],"domain_scores_gemma":[0.99984956,0.00005300461,0.000027064953,0.000012360009,0.000049724647,0.0000083033265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027590053,0.00035747996,0.00024096959,0.0009865452,0.00039859593,0.0004914156,0.00042912195,0.00032563973,0.002934151],"category_scores_gemma":[0.00073742575,0.0002212617,0.00039540234,0.00088403886,0.0004416329,0.00046148378,0.00048120573,0.00030184322,0.000363448],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025268697,0.0000106652205,0.0012051901,0.0000289286,0.0000071611366,0.00004230899,0.000038241546,0.97112817,0.0015349893,0.009868007,0.00024275178,0.015868364],"study_design_scores_gemma":[0.0000014286807,0.000006636311,0.0003318369,0.0000027453477,0.000001662797,0.000009792448,0.000023476416,0.99705017,0.00046201915,0.0015586576,0.00054891675,0.0000025960076],"about_ca_topic_score_codex":0.025248844,"about_ca_topic_score_gemma":0.01938811,"teacher_disagreement_score":0.025248844,"about_ca_system_score_codex":0.0009759138,"about_ca_system_score_gemma":0.0012040541,"threshold_uncertainty_score":0.0502038},"labels":[],"label_agreement":null},{"id":"W2078284897","doi":"10.5555/2429759.2430281","title":"Towards the smart construction site: improving productivity and safety of construction projects using multi-agent systems, real-time simulation and automated machine control","year":2012,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Building information modeling; Control (management); Construction site safety; Computer science; Construction management; Systems engineering; Construction industry; Engineering; Risk analysis (engineering); Construction engineering; Civil engineering; Artificial intelligence; Operations management","score_opus":0.015681307414351024,"score_gpt":0.23515451093214135,"score_spread":0.21947320351779032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078284897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05335984,0.00027622387,0.9415324,0.00070806534,0.000030175082,0.00007555964,0.000040161234,0.0005112179,0.0034663784],"genre_scores_gemma":[0.5172893,0.00057809765,0.4796246,0.0000926517,0.000028910394,0.00012628312,0.0001441093,0.00008463561,0.0020313875],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863166,0.000659603,0.000052252217,0.00015405586,0.00043015924,0.00007229651],"domain_scores_gemma":[0.9982759,0.00057170115,0.0003891143,0.00029989582,0.0003057058,0.0001576697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002057442,0.00077468087,0.00057157414,0.0007772463,0.0005838897,0.0027538054,0.0012122142,0.0016718388,0.0018397719],"category_scores_gemma":[0.0032946952,0.00048416093,0.00046678956,0.001001159,0.0015073194,0.0033678655,0.0021687816,0.001081773,0.00061957556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023153305,0.00037270467,0.0073647327,0.00038744547,0.000075293974,0.00024138794,0.0010673337,0.708374,0.025921145,0.050340552,0.0025032102,0.2031206],"study_design_scores_gemma":[0.000043398948,0.0002137029,0.0023543541,0.000051651434,0.000026952544,0.00009343951,0.00040231203,0.94208854,0.009007213,0.035351384,0.010319756,0.000047246558],"about_ca_topic_score_codex":0.0026584615,"about_ca_topic_score_gemma":0.0027247288,"teacher_disagreement_score":0.0027538054,"about_ca_system_score_codex":0.0007948626,"about_ca_system_score_gemma":0.0017373329,"threshold_uncertainty_score":0.010880947},"labels":[],"label_agreement":null},{"id":"W2078805444","doi":"10.2316/journal.206.2008.3.206-3065","title":"AUTOMATED REAL-TIME MOTION PLANNING AND CONTROL OF CONSTRUCTION EQUIPMENT MECHANISM","year":2008,"lang":"en","type":"article","venue":"International Journal of Robotics and Automation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Mechanism (biology); Computer science; Motion (physics); Control (management); Real-time computing; Artificial intelligence","score_opus":0.008226281094036055,"score_gpt":0.22200889318183334,"score_spread":0.21378261208779728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2078805444","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13120443,0.00021798808,0.86293095,0.000080107726,0.000056819626,0.00007883607,0.00006621218,0.0014978767,0.0038667938],"genre_scores_gemma":[0.9581642,0.00004077704,0.040795416,0.000009511632,0.0000047556637,0.00004544385,0.000031901858,0.000019676334,0.00088826753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974936,0.000054867898,0.0000097961365,0.000057008496,0.00009180988,0.000037263744],"domain_scores_gemma":[0.99968946,0.00012502243,0.000058107067,0.000048136633,0.000057408637,0.000021862192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048855285,0.00043944165,0.0005754991,0.0004341886,0.0004274234,0.0005330304,0.00077557424,0.0004492118,0.0016208066],"category_scores_gemma":[0.00071994006,0.00043687105,0.00030517604,0.00032861842,0.0004474022,0.0003524492,0.000482375,0.00034746472,0.00022040977],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041415342,0.00008928621,0.0005703194,0.00009431492,0.00003186222,0.00012065445,0.00013177386,0.8063893,0.027953345,0.004503904,0.0009089098,0.15879218],"study_design_scores_gemma":[0.000029492823,0.00005932999,0.00067434914,0.0000035651603,0.000005883059,0.000019455902,0.000011691137,0.9939023,0.0035247393,0.0011153815,0.00064781023,0.0000060827874],"about_ca_topic_score_codex":0.007318638,"about_ca_topic_score_gemma":0.0071137827,"teacher_disagreement_score":0.007318638,"about_ca_system_score_codex":0.00040982835,"about_ca_system_score_gemma":0.0010545524,"threshold_uncertainty_score":0.014552116},"labels":[],"label_agreement":null},{"id":"W2080802427","doi":"10.1111/0885-9507.00215","title":"A Hybrid AL‐Based System for Site Layout Planning in Construction","year":2001,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Vagueness; Closeness; Process (computing); Computer science; Knowledge base; Plan (archaeology); Fuzzy logic; Genetic algorithm; Artificial intelligence; Machine learning; Mathematics","score_opus":0.0046856972557643385,"score_gpt":0.18210162589440074,"score_spread":0.1774159286386364,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080802427","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020451266,0.00015586875,0.92279124,0.00008280765,0.00012324896,0.00013705585,0.00094526104,0.0466485,0.008664803],"genre_scores_gemma":[0.31579497,0.00017867696,0.66654354,0.00020840461,0.000057587673,0.0003152338,0.0023166349,0.0011914864,0.013393489],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999464,0.00006719541,0.00003579813,0.00012473429,0.00026661315,0.00004172333],"domain_scores_gemma":[0.9994375,0.00010366331,0.000032359338,0.00013391256,0.00024500195,0.000047540798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005151073,0.000941315,0.0008714346,0.0020123436,0.00070158346,0.0019536251,0.0020994293,0.0009445196,0.018960174],"category_scores_gemma":[0.0010624637,0.000711064,0.00050603214,0.0021164194,0.00029830038,0.0012589121,0.001432641,0.00045124718,0.0059863683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009381142,0.00027760924,0.0032024183,0.00032722377,0.00018021894,0.00021196519,0.00028195648,0.076160595,0.05938574,0.004162245,0.02423547,0.8306363],"study_design_scores_gemma":[0.000118962365,0.0001321807,0.0017875227,0.000021861579,0.000119201984,0.00012276895,0.00009903967,0.92679816,0.03618957,0.0028347617,0.03169927,0.00007656375],"about_ca_topic_score_codex":0.009322327,"about_ca_topic_score_gemma":0.012631055,"teacher_disagreement_score":0.018960174,"about_ca_system_score_codex":0.0006272039,"about_ca_system_score_gemma":0.0010422346,"threshold_uncertainty_score":0.063428104},"labels":[],"label_agreement":null},{"id":"W2080988885","doi":"10.1139/l04-115","title":"The application of knowledge management to support the sustainable analysis of urban transportation infrastructure","year":2005,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Monorail; Status quo; Cost–benefit analysis; Transport engineering; Sustainability; Sample (material); Computer science; Risk analysis (engineering); Business; Environmental economics; Engineering; Civil engineering; Economics","score_opus":0.0022149493239353936,"score_gpt":0.17470679046894463,"score_spread":0.17249184114500923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2080988885","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039869893,0.0015320575,0.90121305,0.0059758285,0.00009886359,0.00030903728,0.00038236764,0.00049356354,0.05012537],"genre_scores_gemma":[0.50576943,0.0016935642,0.48921517,0.00027187495,0.0000746393,0.00021283867,0.0005439166,0.000044646335,0.0021739565],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99772006,0.0009973912,0.0001932871,0.00015711434,0.00081020506,0.00012195499],"domain_scores_gemma":[0.99562484,0.002637398,0.000414721,0.0006278185,0.00057348306,0.00012182954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047559016,0.000558415,0.0004999056,0.004407554,0.001177168,0.0045564813,0.0015117631,0.0013030184,0.0019564843],"category_scores_gemma":[0.007508655,0.00033981717,0.0009807191,0.0042367284,0.0021951841,0.006518845,0.0024384558,0.0010177138,0.00031051695],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058305242,0.0002543103,0.002702444,0.00079822855,0.00017910734,0.0006066788,0.0013825867,0.089517936,0.0022085372,0.5925201,0.0041624573,0.30560935],"study_design_scores_gemma":[0.000040923984,0.000082152204,0.002341724,0.0005356103,0.00012312083,0.0004399359,0.0014771478,0.24957404,0.0043963436,0.67470455,0.066193804,0.00009059843],"about_ca_topic_score_codex":0.005829177,"about_ca_topic_score_gemma":0.0063887867,"teacher_disagreement_score":0.005829177,"about_ca_system_score_codex":0.0024288185,"about_ca_system_score_gemma":0.0031329766,"threshold_uncertainty_score":0.025151908},"labels":[],"label_agreement":null},{"id":"W2081977149","doi":"10.1061/(asce)0887-3801(2005)19:3(277)","title":"Framework for Building Intelligent Simulation Models of Construction Operations","year":2005,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Simulation modeling; Obstacle; Randomness; Systems engineering; Modeling and simulation; Industrial engineering; Engineering; Simulation","score_opus":0.018094006715734925,"score_gpt":0.2641517412842484,"score_spread":0.2460577345685135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2081977149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00068940537,0.000068345056,0.9957112,0.00013857684,0.000021787468,0.0000778846,0.00009062456,0.00045453027,0.0027476933],"genre_scores_gemma":[0.057139356,0.00038972177,0.93904245,0.00006716039,0.000051204144,0.0006329514,0.0004767031,0.00012619045,0.0020742614],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99879825,0.00042632758,0.00011667358,0.00015841707,0.00039078557,0.00010955955],"domain_scores_gemma":[0.9989723,0.0004165628,0.00011683155,0.0002096234,0.00020845857,0.00007626686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027156014,0.0012494809,0.0012777866,0.0020586848,0.0012094837,0.00295103,0.0041727778,0.00205745,0.005474594],"category_scores_gemma":[0.0035576883,0.0009061637,0.0038294918,0.0012633632,0.0020279402,0.0029209673,0.00254779,0.0026991384,0.0014025611],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019022744,0.000052476615,0.0003200661,0.00007425698,0.000049303424,0.00007609511,0.00017661507,0.3453032,0.0008434416,0.63944954,0.0011280212,0.012507932],"study_design_scores_gemma":[0.000024988429,0.00002531872,0.00008534986,0.000043207154,0.000030106206,0.000051242667,0.00003870243,0.8376302,0.0005534,0.13597985,0.025514275,0.000023315335],"about_ca_topic_score_codex":0.011205551,"about_ca_topic_score_gemma":0.011715608,"teacher_disagreement_score":0.011205551,"about_ca_system_score_codex":0.001965883,"about_ca_system_score_gemma":0.0037791852,"threshold_uncertainty_score":0.022280633},"labels":[],"label_agreement":null},{"id":"W2082550304","doi":"10.1139/l08-145","title":"Integration of four-dimensional computer-aided design modeling and three-dimensional animation of operations simulation for visualizing construction of the main stadium for the Beijing 2008 Olympic games","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Hong Kong Polytechnic University","keywords":"Animation; Beijing; Stadium; Plan (archaeology); Computer science; Zoom; Interactive design; CAD; Schedule; Computer Aided Design; Computer animation; Floor plan; Computer graphics (images); Engineering drawing; Human–computer interaction; Engineering","score_opus":0.022719398722112073,"score_gpt":0.22153709465181148,"score_spread":0.19881769592969942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2082550304","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0046063093,0.00044450833,0.9853676,0.00020334157,0.00006907938,0.000070973896,0.000077606215,0.0013274314,0.007833064],"genre_scores_gemma":[0.15503776,0.001882234,0.8375596,0.00011023483,0.000033845816,0.0002912225,0.00040430797,0.0004351614,0.0042457245],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991099,0.00022264181,0.00006880736,0.000071414186,0.0004954962,0.000031727137],"domain_scores_gemma":[0.9987587,0.0005414593,0.00006709447,0.00025675408,0.0003314072,0.0000445147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001389976,0.00084707607,0.00051387394,0.0018347627,0.00044070563,0.0019903954,0.0010588645,0.0008254632,0.005817786],"category_scores_gemma":[0.0025523955,0.0007039533,0.0010998385,0.0010614668,0.00063746306,0.0010495036,0.0010217329,0.00089612784,0.0010914806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012110402,0.00015054113,0.0034866154,0.0010317017,0.00015512088,0.00039083336,0.0013980053,0.35062256,0.052013613,0.10036138,0.01006356,0.480205],"study_design_scores_gemma":[0.00003239587,0.00007869828,0.0015737023,0.00019173509,0.0000695867,0.00035657609,0.00016327141,0.8269895,0.024742717,0.010251177,0.13544367,0.00010693722],"about_ca_topic_score_codex":0.004134023,"about_ca_topic_score_gemma":0.0059802025,"teacher_disagreement_score":0.005817786,"about_ca_system_score_codex":0.00078279176,"about_ca_system_score_gemma":0.001135165,"threshold_uncertainty_score":0.019462466},"labels":[],"label_agreement":null},{"id":"W2083365345","doi":"10.1007/s00158-004-0470-4","title":"Design optimization of simply supported concrete slabs by finite element modelling","year":2005,"lang":"en","type":"article","venue":"Structural and Multidisciplinary Optimization","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Finite element method; Parametric statistics; Chart; Reliability (semiconductor); Structural engineering; Displacement (psychology); Process (computing); Engineering design process; Computer science; Set (abstract data type); Engineering; Mechanical engineering; Mathematics","score_opus":0.012069522911936638,"score_gpt":0.22079184202485289,"score_spread":0.20872231911291625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2083365345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13347854,0.00036233355,0.8509021,0.0001883841,0.0000423706,0.000094818024,0.00015713279,0.00035806547,0.014416277],"genre_scores_gemma":[0.78873503,0.0003458864,0.20029962,0.00005630773,0.000019373347,0.00027920125,0.00025747114,0.00027625257,0.0097309],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954766,0.0001569731,0.000016121034,0.00003887944,0.0001841562,0.000056175504],"domain_scores_gemma":[0.99955326,0.00025242852,0.000045630608,0.000038800164,0.00008301061,0.000026775318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071149744,0.0008461089,0.0014051922,0.00083119824,0.0004790031,0.0010757698,0.0010928067,0.0014923334,0.003151703],"category_scores_gemma":[0.0016767556,0.0012012132,0.0007330676,0.0007228626,0.0008678024,0.00076654146,0.0010208839,0.0006346143,0.0005334503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021025848,0.000019520443,0.00009719667,0.000025795975,0.0000091134925,0.000016178958,0.000016331125,0.9927899,0.001920981,0.0017234191,0.00010468024,0.003255774],"study_design_scores_gemma":[0.000004712598,0.000009391974,0.00004454335,0.0000023231255,0.0000027543683,0.0000044325934,0.0000071678946,0.99874395,0.0004027151,0.0005867598,0.0001891635,0.0000022463762],"about_ca_topic_score_codex":0.0041629258,"about_ca_topic_score_gemma":0.0064769923,"teacher_disagreement_score":0.0041629258,"about_ca_system_score_codex":0.0007024271,"about_ca_system_score_gemma":0.0012219697,"threshold_uncertainty_score":0.010543525},"labels":[],"label_agreement":null},{"id":"W2090252087","doi":"10.1061/(asce)0733-9364(2005)131:9(993)","title":"Technical Knowledge Consolidation using Theory of Inventive Problem Solving","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Consolidation (business); Profitability index; Contradiction; Process (computing); Asset (computer security); Domain knowledge; Domain (mathematical analysis); Knowledge management; Management science; Engineering; Mathematics; Business","score_opus":0.0086191784857593,"score_gpt":0.2112510238382955,"score_spread":0.2026318453525362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090252087","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01412578,0.00057266426,0.9703311,0.0006783647,0.000037309863,0.0002650455,0.000034703164,0.00013238285,0.013822686],"genre_scores_gemma":[0.2288685,0.001139182,0.76573074,0.00019086016,0.000053881424,0.0007259505,0.0001860893,0.000038058624,0.0030666636],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99537164,0.0018769195,0.0004924541,0.0006359387,0.0014294492,0.00019363781],"domain_scores_gemma":[0.9880822,0.008698109,0.0006930811,0.0012688392,0.001122156,0.00013565838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064884573,0.0008835547,0.0011607419,0.0075216326,0.0012218282,0.0066459873,0.002715489,0.0014801592,0.0036209028],"category_scores_gemma":[0.01472247,0.00069393346,0.0022671346,0.003408698,0.0064870925,0.010449424,0.0044114827,0.0022240279,0.00047647973],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003131489,0.0001766421,0.0017248668,0.00050373084,0.00013761914,0.0003135794,0.0050772983,0.035436995,0.0013318416,0.8009957,0.0010000864,0.1532703],"study_design_scores_gemma":[0.000050777766,0.00006729931,0.0006600749,0.00027775762,0.00006210976,0.00035067878,0.0019637803,0.18794985,0.0028633187,0.78728926,0.018405596,0.000059383],"about_ca_topic_score_codex":0.001588498,"about_ca_topic_score_gemma":0.0017569857,"teacher_disagreement_score":0.0075216326,"about_ca_system_score_codex":0.00264964,"about_ca_system_score_gemma":0.0029279958,"threshold_uncertainty_score":0.034314632},"labels":[],"label_agreement":null},{"id":"W2090853541","doi":"10.1111/0885-9507.00196","title":"A Multiobjective and Stochastic System for Building Maintenance Management","year":2000,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":55,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Maximization; Multi-objective optimization; Computer science; Stochastic programming; Minification; Prioritization; Stochastic optimization; Mathematical optimization; Reliability engineering; Preventive maintenance; Risk analysis (engineering); Decision support system; Operations research; Engineering; Management science; Business; Mathematics","score_opus":0.00219760042188058,"score_gpt":0.16235287211637445,"score_spread":0.16015527169449387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2090853541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01703851,0.000080239435,0.98064786,0.00009293701,0.000028987033,0.00009243653,0.0001226345,0.00057729625,0.0013191521],"genre_scores_gemma":[0.6128671,0.00018586521,0.38154262,0.00010768241,0.000065886234,0.0008504545,0.00045091155,0.000096961,0.0038324525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99912816,0.00028040993,0.00006532973,0.00017820658,0.00026108252,0.00008674144],"domain_scores_gemma":[0.9990546,0.0004404488,0.00013265951,0.000056185396,0.0002462414,0.00006975043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002315503,0.000964872,0.0014717502,0.001155696,0.0008473114,0.0013311545,0.0013320309,0.001776531,0.0031558042],"category_scores_gemma":[0.0027084039,0.0007114449,0.0008657446,0.0011081077,0.0005684404,0.0008601213,0.0016543043,0.0009360955,0.0005255332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002586646,0.000032537388,0.00017747884,0.000020062571,0.000022453354,0.000017429335,0.000013856031,0.98019695,0.00048374868,0.0017460254,0.00022323933,0.017040376],"study_design_scores_gemma":[0.0000049632004,0.000013466927,0.000047393958,0.0000015250374,0.000004855742,0.000003158791,0.0000012055298,0.9993081,0.000076003475,0.00042804156,0.00010878629,0.0000024417952],"about_ca_topic_score_codex":0.00981186,"about_ca_topic_score_gemma":0.011529741,"teacher_disagreement_score":0.00981186,"about_ca_system_score_codex":0.0014626273,"about_ca_system_score_gemma":0.002047697,"threshold_uncertainty_score":0.019509494},"labels":[],"label_agreement":null},{"id":"W2091603450","doi":"10.1061/41109(373)18","title":"An IDP-BIM Framework for Reshaping Professional Design Practices","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Knowledge management; Situated; Building information modeling; Process (computing); Fragmentation (computing); Knowledge transfer; Best practice; Human–computer interaction; Process management; Engineering; Artificial intelligence","score_opus":0.03922652413426811,"score_gpt":0.32844613500839115,"score_spread":0.28921961087412307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091603450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022394396,0.00047750658,0.97698,0.0011807727,0.000059978192,0.00029042212,0.00012529471,0.00042025448,0.018226417],"genre_scores_gemma":[0.03796767,0.00034727872,0.95892006,0.000096676435,0.000015616988,0.0005451948,0.0002423987,0.000050891533,0.001814213],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99132454,0.0049099303,0.0007625164,0.00088473735,0.001726596,0.0003918424],"domain_scores_gemma":[0.99716103,0.0010865774,0.0002930601,0.000656661,0.0005366375,0.0002661186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008846632,0.0014174985,0.00090608734,0.006488506,0.002674453,0.008727017,0.0044774273,0.0027896452,0.0038325253],"category_scores_gemma":[0.0065602674,0.0009025223,0.0017168141,0.006088925,0.0071212635,0.009129863,0.008330077,0.0028647033,0.0013352401],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012949579,0.00006902692,0.00061598874,0.00028182234,0.000017620734,0.00032798637,0.0057432763,0.009181432,0.0005138814,0.912011,0.0028368416,0.068388164],"study_design_scores_gemma":[0.000036007863,0.00007609645,0.00093433145,0.0007128231,0.000049540467,0.0010247629,0.00706151,0.093470246,0.0011508705,0.6571697,0.23823221,0.00008189331],"about_ca_topic_score_codex":0.008450421,"about_ca_topic_score_gemma":0.009399807,"teacher_disagreement_score":0.008846632,"about_ca_system_score_codex":0.0051859724,"about_ca_system_score_gemma":0.006603812,"threshold_uncertainty_score":0.04678601},"labels":[],"label_agreement":null},{"id":"W2091875401","doi":"10.1139/l02-110","title":"Integrated three-dimensional computer-aided design and discrete-event simulation models","year":2003,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"CAD; Computer Aided Design; Component (thermodynamics); Context (archaeology); Computer science; Key (lock); Engineering drawing; Software; Systems engineering; Engineering","score_opus":0.013076039179299764,"score_gpt":0.18504306794136605,"score_spread":0.1719670287620663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2091875401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005709974,0.00015345069,0.98510504,0.00014911241,0.000041714353,0.00016068127,0.00022090072,0.0007880759,0.0076709804],"genre_scores_gemma":[0.28513464,0.0009931311,0.7023652,0.000115486546,0.00004121131,0.001246414,0.0011563848,0.0002057522,0.008741742],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99830353,0.0004514959,0.00013161806,0.00014380422,0.0009061669,0.00006344513],"domain_scores_gemma":[0.99763453,0.0013839909,0.00015258936,0.00024676713,0.00052792626,0.00005418553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015799265,0.0008761445,0.0009775343,0.0011749783,0.00042536703,0.0021551226,0.0020921691,0.0012528922,0.005183626],"category_scores_gemma":[0.0035497642,0.00071633543,0.0011588064,0.0010269075,0.000730376,0.0010945762,0.001042394,0.0010177376,0.0010017095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003576072,0.000035751138,0.0005007238,0.00008732094,0.00003436642,0.000059115704,0.00006426503,0.95686436,0.0011486444,0.023167724,0.0006052059,0.017396659],"study_design_scores_gemma":[0.00001701742,0.000025801473,0.00010111044,0.000013918119,0.000014028993,0.000025521676,0.000010823814,0.98810726,0.0011604463,0.00417423,0.0063376203,0.000012258872],"about_ca_topic_score_codex":0.008324949,"about_ca_topic_score_gemma":0.0068300306,"teacher_disagreement_score":0.008324949,"about_ca_system_score_codex":0.001170311,"about_ca_system_score_gemma":0.0023298531,"threshold_uncertainty_score":0.017341018},"labels":[],"label_agreement":null},{"id":"W2092364284","doi":"10.3992/jgb.7.3.16","title":"FROM YOUR CAR TO YOUR PATIO: USING RECYCLED TIRE PRODUCTS IN BUILDING PROJECTS","year":2012,"lang":"en","type":"article","venue":"Journal of Green Building","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Environmental science; Civil engineering; Automotive engineering; Waste management","score_opus":0.043221712524864724,"score_gpt":0.2797438039893068,"score_spread":0.23652209146444209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2092364284","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30283484,0.014095283,0.014319606,0.06852869,0.001105836,0.00033664252,0.0005387716,0.00075546757,0.5974848],"genre_scores_gemma":[0.7477019,0.018254604,0.02604015,0.0045557935,0.00010945369,0.000113229544,0.0002900797,0.00017610642,0.20275874],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99872655,0.0003732813,0.000019785053,0.000062360275,0.0005515514,0.00026646245],"domain_scores_gemma":[0.9990765,0.00013945767,0.00005600602,0.000033522036,0.00032702638,0.00036748196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014053863,0.00031960738,0.000128473,0.0005085296,0.006922767,0.0046505057,0.0009101984,0.0013169446,0.01277506],"category_scores_gemma":[0.0021766475,0.00024369408,0.00015673049,0.0013078288,0.00231789,0.0017787886,0.0023358848,0.0010855647,0.0020804459],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063413856,0.00029577987,0.02829453,0.000754787,0.000012806121,0.00301586,0.2032949,0.0007730829,0.0034443699,0.04027496,0.20252444,0.51725113],"study_design_scores_gemma":[0.0000066222697,0.00007150435,0.026360953,0.0005942985,0.000014331153,0.0016036583,0.22961892,0.00041030315,0.0015494222,0.0030697659,0.73665047,0.00004969673],"about_ca_topic_score_codex":0.36559933,"about_ca_topic_score_gemma":0.7549556,"teacher_disagreement_score":0.36559933,"about_ca_system_score_codex":0.008053645,"about_ca_system_score_gemma":0.018174103,"threshold_uncertainty_score":0.72694266},"labels":[],"label_agreement":null},{"id":"W2094872154","doi":"10.1139/l99-057","title":"A preliminary study of the factors affecting the cost escalation of construction projects","year":2000,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Set (abstract data type); Fuzzy logic; Fuzzy set; Control (management); Operations research; Engineering; Risk analysis (engineering); Cost estimate; Cost contingency; Cost overrun; Computer science; Construction engineering; Systems engineering; Construction industry; Cost engineering; Business; Artificial intelligence","score_opus":0.008374325636464968,"score_gpt":0.17856033596485849,"score_spread":0.1701860103283935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2094872154","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9986222,0.000032705088,0.00048857176,0.00006651495,4.8922044e-7,0.00004816478,0.000042231884,0.0000017441905,0.0006974042],"genre_scores_gemma":[0.9983058,0.00009294305,0.00075231807,0.00001938137,0.0000014277432,0.000047481935,0.000073526244,8.2573297e-7,0.0007062738],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99798214,0.0008992367,0.00009190456,0.00008716358,0.0005508781,0.0003886327],"domain_scores_gemma":[0.9882633,0.0069897803,0.002109955,0.00014974075,0.0019590738,0.0005282015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029282016,0.00027829615,0.00020142777,0.0014508484,0.0013509883,0.0011120288,0.0004955128,0.000557866,0.002108326],"category_scores_gemma":[0.013905393,0.000321314,0.00015542457,0.0022505096,0.0007181263,0.0008108114,0.0005522291,0.0006311788,0.00012995869],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024838958,0.0005180896,0.86360604,0.0002734277,0.000026117377,0.0008159199,0.093679145,0.0016852873,0.0036142438,0.00094292674,0.00050696026,0.034083523],"study_design_scores_gemma":[0.0000069475227,0.00041464003,0.8503024,0.000042347645,0.000010742047,0.00015420202,0.14389826,0.0022407533,0.00060619024,0.00013095894,0.002174061,0.000018507393],"about_ca_topic_score_codex":0.08910494,"about_ca_topic_score_gemma":0.1888722,"teacher_disagreement_score":0.08910494,"about_ca_system_score_codex":0.0035965918,"about_ca_system_score_gemma":0.0038543255,"threshold_uncertainty_score":0.1771726},"labels":[],"label_agreement":null},{"id":"W2095258717","doi":"10.5555/1218112.1218546","title":"Conspace simulation application","year":2006,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Space (punctuation); Systems engineering; Space technology; Industrial engineering; Distributed computing; Engineering; Aerospace engineering; Operating system","score_opus":0.012256144250304418,"score_gpt":0.23663059618888466,"score_spread":0.22437445193858024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2095258717","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035328418,0.00047220688,0.5986846,0.00076171634,0.0010000215,0.0008460307,0.010878027,0.14784348,0.2041854],"genre_scores_gemma":[0.5056648,0.0010542832,0.2971184,0.0011419182,0.00024075534,0.0023686201,0.027780281,0.018761046,0.14586988],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993793,0.000118884345,0.000034392797,0.00008738513,0.00032862482,0.000051450104],"domain_scores_gemma":[0.9990702,0.0002596026,0.000031595588,0.00015920437,0.00042515033,0.000054297674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000692546,0.0009907878,0.0006659117,0.00078798167,0.0006098723,0.001174543,0.0016154404,0.0010345343,0.06366279],"category_scores_gemma":[0.0023487504,0.00030616485,0.0006299852,0.0007468655,0.000277908,0.0010279944,0.0017056195,0.00081543316,0.012650319],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012397349,0.00047101793,0.006285904,0.0013310979,0.00015580295,0.0008399309,0.0006252883,0.19729838,0.032921262,0.07262736,0.29444438,0.39175978],"study_design_scores_gemma":[0.0001757673,0.00012071973,0.0013038625,0.000082877705,0.00003778598,0.0002772923,0.0000985031,0.59049845,0.02818732,0.009999506,0.3691526,0.00006532731],"about_ca_topic_score_codex":0.002831926,"about_ca_topic_score_gemma":0.002265169,"teacher_disagreement_score":0.06366279,"about_ca_system_score_codex":0.00043977168,"about_ca_system_score_gemma":0.0009728947,"threshold_uncertainty_score":0.2129733},"labels":[],"label_agreement":null},{"id":"W2096080276","doi":"10.14359/20198","title":"Design of Green Engineered Cementitious Composites for Improved Sustainability","year":2008,"lang":"en","type":"article","venue":"ACI Materials Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":122,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Composite material; Materials science; Sustainability; Cementitious; Cement","score_opus":0.013077516015558602,"score_gpt":0.21111284346785877,"score_spread":0.19803532745230018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096080276","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80548316,0.0036706019,0.14871688,0.00032968205,0.00044850976,0.00021756838,0.00055493164,0.0009779789,0.039600693],"genre_scores_gemma":[0.93797123,0.00091986894,0.049258854,0.000083542625,0.000017555847,0.00010452233,0.00016123407,0.00008667156,0.011396484],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998913,0.000009220002,0.000004738244,0.000016919636,0.000058499496,0.000019228875],"domain_scores_gemma":[0.9999014,0.000014513409,0.000027713186,0.000007913019,0.00003598553,0.0000125306615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015655394,0.0002905373,0.00015812863,0.0004262739,0.00016996184,0.00040142745,0.00022305496,0.00037333125,0.0015235222],"category_scores_gemma":[0.00018754155,0.00016379423,0.0002355817,0.0002133047,0.00016287054,0.00036280995,0.00022080331,0.0002905221,0.00047684734],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061242165,0.00006728857,0.0004570742,0.00026019843,0.000011316559,0.00014131088,0.000039989543,0.015895862,0.95413077,0.0029101323,0.0008085305,0.025216298],"study_design_scores_gemma":[0.00003054227,0.0006015581,0.003584243,0.00006096561,0.000044014178,0.0002691268,0.00013465268,0.07636298,0.87935114,0.0018721864,0.03765458,0.000034088156],"about_ca_topic_score_codex":0.0002651891,"about_ca_topic_score_gemma":0.0016617213,"teacher_disagreement_score":0.0015235222,"about_ca_system_score_codex":0.00026397445,"about_ca_system_score_gemma":0.00026647103,"threshold_uncertainty_score":0.005096674},"labels":[],"label_agreement":null},{"id":"W2096483370","doi":"10.5555/1516744.1517168","title":"Optimization of multi-project environment (OPMPE)","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Project planning; Project management; Work (physics); Project management triangle; Scheduling (production processes); Operations research; Process management; Systems engineering; Engineering; Operations management","score_opus":0.041310247869666056,"score_gpt":0.24016777781376553,"score_spread":0.19885752994409947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096483370","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055554926,0.00025971222,0.92932636,0.00024027792,0.000045452445,0.00015237424,0.00032821624,0.0004023635,0.013690246],"genre_scores_gemma":[0.8664253,0.0003979733,0.12702799,0.000053213815,0.00001510972,0.0005393572,0.00032828774,0.00016481924,0.005048117],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991949,0.0003392323,0.000027343987,0.00011118581,0.00021024037,0.00011701449],"domain_scores_gemma":[0.99935085,0.00034280127,0.00011012762,0.00005955206,0.00009077211,0.00004592208],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096421083,0.00081173173,0.00086408405,0.0005551695,0.00041197354,0.0010485158,0.0007925716,0.00075196533,0.0027726197],"category_scores_gemma":[0.0020945629,0.0005248389,0.00091957295,0.00063359085,0.00052378216,0.0011935971,0.0011770581,0.00074450235,0.0002919103],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009607102,0.000007842733,0.0002525245,0.000015819141,0.0000075503285,0.000016537548,0.0000070872516,0.9941399,0.00023228554,0.0021616176,0.000110458226,0.003038736],"study_design_scores_gemma":[0.000006137448,0.000036796955,0.00021733313,0.0000049634596,0.000005315806,0.000018411178,0.000010608383,0.9955146,0.0003267567,0.0029681183,0.00088585407,0.000005133554],"about_ca_topic_score_codex":0.003882348,"about_ca_topic_score_gemma":0.0028121837,"teacher_disagreement_score":0.003882348,"about_ca_system_score_codex":0.00075595436,"about_ca_system_score_gemma":0.0014407728,"threshold_uncertainty_score":0.009275377},"labels":[],"label_agreement":null},{"id":"W2096696486","doi":"10.1139/cjce-2014-0199","title":"Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Unavailability; Software deployment; Production (economics); Revenue; Capacity management; Computer science; Capacity planning; Productivity; Capacity utilization; Service (business); Stability (learning theory); Work (physics); Operations research; Operations management; Reliability engineering; Engineering; Business; Economics; Computer network","score_opus":0.010122234727204233,"score_gpt":0.18349908955392938,"score_spread":0.17337685482672516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096696486","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023487924,0.00016103649,0.97157514,0.00023092526,0.00003538484,0.00022479246,0.000112618494,0.0016608671,0.0025113777],"genre_scores_gemma":[0.45803967,0.00023883845,0.5392823,0.00007181633,0.00002003003,0.00038116987,0.00026281676,0.0003152791,0.001388055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985411,0.00039759252,0.000086822605,0.00031175627,0.0003487511,0.00031398365],"domain_scores_gemma":[0.9981218,0.0007784525,0.00026299813,0.0002602908,0.00030908055,0.00026733748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034082101,0.0012340442,0.0009543493,0.0012064931,0.00089076464,0.0028179125,0.0033141233,0.0011985599,0.0035086882],"category_scores_gemma":[0.006403885,0.0008993646,0.0010559623,0.0008784659,0.0014144442,0.0018397052,0.0030576654,0.0013887811,0.0005799941],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001251587,0.00010099091,0.0013192547,0.00011090222,0.000029471876,0.0001438544,0.00022273297,0.9489337,0.004816989,0.017761294,0.000867422,0.025568191],"study_design_scores_gemma":[0.000028182749,0.000047327074,0.00016673403,0.000016416841,0.000012874695,0.000020220094,0.00006841381,0.99245596,0.0016779795,0.004036725,0.0014560863,0.000013021142],"about_ca_topic_score_codex":0.0142828,"about_ca_topic_score_gemma":0.011016059,"teacher_disagreement_score":0.0142828,"about_ca_system_score_codex":0.0026553946,"about_ca_system_score_gemma":0.0052686986,"threshold_uncertainty_score":0.028399289},"labels":[],"label_agreement":null},{"id":"W2096817884","doi":"10.5555/1516744.1517175","title":"An integrated CAD and simulation model for concrete operations","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Visual Basic for Applications; Downtown; Slab; CAD; Computer science; Software; Engineering drawing; Civil engineering; Software engineering; Engineering; Structural engineering; Operating system","score_opus":0.04144232926489277,"score_gpt":0.2749843824160165,"score_spread":0.23354205315112375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096817884","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026025644,0.0002592487,0.9453809,0.00022202056,0.00007730468,0.00015491495,0.0008878299,0.0014297855,0.025562296],"genre_scores_gemma":[0.7131075,0.0010402491,0.24898045,0.00012671106,0.000055724453,0.00092568493,0.0022236852,0.00033989706,0.033200018],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961156,0.000066194014,0.000031669737,0.0000663357,0.0001730004,0.00005120446],"domain_scores_gemma":[0.9997396,0.00008806579,0.000030165815,0.000030476664,0.000094353665,0.000017280183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00037964253,0.00074907264,0.000725051,0.00078727346,0.00041069504,0.0015925241,0.0014263586,0.0016440497,0.007895928],"category_scores_gemma":[0.000880918,0.0006215027,0.0010260919,0.0008803978,0.0005233061,0.00094067404,0.0006873823,0.0007880537,0.0013346582],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027020842,0.000024404128,0.00032113746,0.000027548343,0.000009471902,0.00005092528,0.000040065897,0.9819271,0.0014974547,0.010695979,0.00034019802,0.005038743],"study_design_scores_gemma":[0.000008534911,0.000012764561,0.00010368844,0.000006396804,0.000008639958,0.000020875394,0.000007989084,0.994522,0.00059504266,0.0013163285,0.003391607,0.0000061393157],"about_ca_topic_score_codex":0.01377979,"about_ca_topic_score_gemma":0.008535945,"teacher_disagreement_score":0.01377979,"about_ca_system_score_codex":0.0009655497,"about_ca_system_score_gemma":0.001560748,"threshold_uncertainty_score":0.027399182},"labels":[],"label_agreement":null},{"id":"W2096833878","doi":"10.1139/l2012-077","title":"Post simulation visualization model for effective scheduling of modular building construction<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Schedule; Scheduling (production processes); Computer science; Construction management; Factory (object-oriented programming); ASCII; Animation; Engineering; Industrial engineering; Civil engineering; Computer graphics (images); Operating system; Mechanical engineering; Operations management","score_opus":0.0050525624977264,"score_gpt":0.19928570742520027,"score_spread":0.19423314492747387,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096833878","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02625821,0.00011051724,0.95183384,0.00021668292,0.00011025512,0.0001385684,0.00067917624,0.010245461,0.0104071805],"genre_scores_gemma":[0.49475747,0.00046224226,0.48891386,0.000058130005,0.000049326718,0.00049168704,0.0020326618,0.0013698007,0.011864847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998323,0.000042886826,0.000011677515,0.000023838584,0.00007316239,0.000016065469],"domain_scores_gemma":[0.9995383,0.000203793,0.00003817074,0.000048715177,0.00014599544,0.000025075225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042035538,0.000711089,0.00036892467,0.00056997256,0.0002750548,0.0009396837,0.0007625747,0.00045070745,0.012093468],"category_scores_gemma":[0.0011946992,0.0003049745,0.0006204791,0.0004258919,0.0001696534,0.0006560154,0.000491248,0.0005504545,0.0010249555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040796684,0.00017224312,0.0037359195,0.0003115635,0.000037503407,0.00025206505,0.00057689514,0.7944912,0.030933382,0.029703438,0.012922875,0.12645496],"study_design_scores_gemma":[0.000015114376,0.000043929318,0.00038794283,0.000014149399,0.000012167337,0.000024983881,0.000025615387,0.98207515,0.00648719,0.0011230167,0.00978096,0.000009872523],"about_ca_topic_score_codex":0.0046818694,"about_ca_topic_score_gemma":0.0041541797,"teacher_disagreement_score":0.012093468,"about_ca_system_score_codex":0.0005402461,"about_ca_system_score_gemma":0.00091353897,"threshold_uncertainty_score":0.040456653},"labels":[],"label_agreement":null},{"id":"W2096858734","doi":"","title":"Whole life building management: occupancy to dismantling","year":2000,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Standardization; Demolition; Scope (computer science); Building information modeling; Process (computing); Work (physics); Asset (computer security); Session (web analytics); Engineering management; Computer science; Engineering; Process management; Knowledge management; Operations management; Civil engineering; World Wide Web","score_opus":0.006414178199136263,"score_gpt":0.20621491390085173,"score_spread":0.19980073570171547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096858734","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26693773,0.004502762,0.4995549,0.008168404,0.0012671541,0.00031180307,0.0005224957,0.0034103915,0.21532425],"genre_scores_gemma":[0.88755715,0.0009925263,0.055812262,0.0003449816,0.00013254661,0.000074102456,0.00035989177,0.0005285162,0.054198027],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99885654,0.00027250435,0.000044670593,0.0001517382,0.00043677835,0.0002377519],"domain_scores_gemma":[0.99908006,0.0001635321,0.00011156856,0.00018787422,0.00026434724,0.00019255398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000904187,0.0005252508,0.0005802822,0.0005932997,0.0011660308,0.002927475,0.0016432179,0.00062508567,0.015184071],"category_scores_gemma":[0.0019702006,0.00033627052,0.00031647462,0.0009093527,0.00087896996,0.0032622712,0.0024218098,0.00077288575,0.0018195559],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020036679,0.00022908674,0.0074032214,0.00023795095,0.000028815346,0.0001248932,0.002239815,0.016655423,0.0046662553,0.03198672,0.016174056,0.9200534],"study_design_scores_gemma":[0.00006207469,0.0010823623,0.04842657,0.0006091726,0.00023256452,0.001405866,0.025157858,0.28193173,0.020102909,0.06359962,0.55718595,0.00020341747],"about_ca_topic_score_codex":0.010058672,"about_ca_topic_score_gemma":0.026882233,"teacher_disagreement_score":0.015184071,"about_ca_system_score_codex":0.0009462599,"about_ca_system_score_gemma":0.0016545636,"threshold_uncertainty_score":0.050795794},"labels":[],"label_agreement":null},{"id":"W2096916326","doi":"10.14288/1.0076445","title":"Améliorer les processus de communication sur les chantiers de construction à l'aide des technologies mobiles et des technologies infonuagiques","year":2015,"lang":"fr","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.01792366991227897,"score_gpt":0.1925150873681029,"score_spread":0.17459141745582393,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2096916326","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24150644,0.0032871747,0.6791778,0.0032472396,0.00037816665,0.00047584134,0.00014212159,0.0015350287,0.07025018],"genre_scores_gemma":[0.70146203,0.003039357,0.25538838,0.00032205912,0.00009857382,0.0004352754,0.00025607637,0.00042508077,0.038573086],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99458545,0.0018001989,0.0002220762,0.00059132423,0.0022684417,0.00053251674],"domain_scores_gemma":[0.9915936,0.0038732495,0.0007935248,0.0012820913,0.0020822424,0.0003753334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044982876,0.00093150546,0.00060300063,0.0015754985,0.0019404921,0.0064646597,0.001480518,0.002152443,0.0074168327],"category_scores_gemma":[0.012838631,0.00062684505,0.0007461484,0.0017372924,0.0020776826,0.005337172,0.003545149,0.001898394,0.0024984386],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051269185,0.00042983875,0.010342541,0.0017978043,0.00008214107,0.0012992949,0.026826557,0.036842946,0.086116426,0.16774704,0.005732099,0.6622706],"study_design_scores_gemma":[0.00013792401,0.0018219927,0.026711192,0.0020336153,0.000306859,0.0021522131,0.037728544,0.14344732,0.16507119,0.08772416,0.53249156,0.00037334498],"about_ca_topic_score_codex":0.0041979537,"about_ca_topic_score_gemma":0.0040094857,"teacher_disagreement_score":0.0074168327,"about_ca_system_score_codex":0.0017539606,"about_ca_system_score_gemma":0.00409279,"threshold_uncertainty_score":0.024811804},"labels":[],"label_agreement":null},{"id":"W2097590915","doi":"10.1139/l2012-059","title":"Estimating productivity of earthmoving operations using spatial technologies<sup>1</sup>This paper is one of a selection of papers in this Special Issue on Construction Engineering and Management.","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Global Positioning System; Excavator; Process (computing); Software; Computer science; Automation; Industrial engineering; Data mining; Engineering; Simulation; Civil engineering","score_opus":0.006218157431427157,"score_gpt":0.17896066064854804,"score_spread":0.1727425032171209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097590915","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0977266,0.0005392851,0.89061743,0.000096846394,0.00007564022,0.0001223246,0.0016006432,0.002981273,0.006240012],"genre_scores_gemma":[0.48434854,0.0007927777,0.50940174,0.00003232816,0.00004917572,0.00013651628,0.0020434223,0.00028860214,0.0029068808],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.998801,0.00017165777,0.00008778858,0.00018925876,0.000691097,0.000059222042],"domain_scores_gemma":[0.9978733,0.0007609253,0.00038564464,0.00020573795,0.00073755375,0.00003688741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007259972,0.0010177342,0.0005234341,0.004725821,0.00026122693,0.0013991399,0.0007037219,0.00046955014,0.0028481472],"category_scores_gemma":[0.0033366692,0.00034245648,0.00056723296,0.0044903196,0.00022840124,0.0012939317,0.0006517429,0.0002445791,0.0011430901],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012921733,0.00009535898,0.064904794,0.00048474918,0.0001522609,0.00018086498,0.0002345789,0.163609,0.017478483,0.0022869115,0.0034542594,0.7469895],"study_design_scores_gemma":[0.000011474298,0.00015896787,0.074993275,0.00011931559,0.000102900725,0.00042728373,0.0005642276,0.8608878,0.043642957,0.0035193507,0.015481924,0.00009049634],"about_ca_topic_score_codex":0.0042147995,"about_ca_topic_score_gemma":0.008578073,"teacher_disagreement_score":0.004725821,"about_ca_system_score_codex":0.0006144535,"about_ca_system_score_gemma":0.000537505,"threshold_uncertainty_score":0.009527981},"labels":[],"label_agreement":null},{"id":"W2097666093","doi":"","title":"A Survey on the Impact of Information Technology in the Canadian Architecture, Engineering and Construction Industry","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":138,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Work (physics); Architecture; Investment (military); The Internet; Quality (philosophy); Information technology; Engineering; Business; Enterprise architecture; Engineering management; Marketing; Operations management; Industrial organization; Computer science; Economics","score_opus":0.005663437810450658,"score_gpt":0.18790680709214122,"score_spread":0.18224336928169055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097666093","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9695836,0.0010486435,0.00020604864,0.001836862,0.0000210963,0.00008638568,0.002376446,0.000017747814,0.024823193],"genre_scores_gemma":[0.98212576,0.0042817476,0.0004067615,0.00079620024,0.000013826507,0.00004557257,0.0017677054,0.000009209306,0.010553278],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.996819,0.00017366634,0.00010202689,0.00010531849,0.0020932902,0.0007066478],"domain_scores_gemma":[0.992156,0.0011440476,0.0010542445,0.0000783619,0.0042767692,0.0012904592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015030046,0.00019282154,0.00020588153,0.0040939837,0.0027259337,0.0017848441,0.00043496292,0.00050131854,0.0042121727],"category_scores_gemma":[0.0052274726,0.00022802179,0.00021195851,0.010183231,0.0007613683,0.0007053699,0.0010046661,0.0006564998,0.00037274373],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009890284,0.00013607406,0.8746679,0.0003877735,0.000027447939,0.00036076846,0.027282506,0.000267954,0.002328591,0.0012250807,0.013065688,0.08015145],"study_design_scores_gemma":[0.000002238556,0.000055513778,0.94794136,0.000075134,0.0000075527782,0.00006042831,0.028453862,0.00012587257,0.00017988471,0.0000280921,0.023053978,0.000016226397],"about_ca_topic_score_codex":0.9629414,"about_ca_topic_score_gemma":0.98060143,"teacher_disagreement_score":0.03705859,"about_ca_system_score_codex":0.01529114,"about_ca_system_score_gemma":0.031271458,"threshold_uncertainty_score":0.11094552},"labels":[],"label_agreement":null},{"id":"W2097911660","doi":"10.5555/2693848.2694271","title":"Material and facility layout planning in construction projects using simulation","year":2014,"lang":"en","type":"article","venue":"Northumbria Research Link (Northumbria University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Haulage; Material handling; Yard; Computer science; Process (computing); Genetic algorithm; Position (finance); Page layout; Domain (mathematical analysis); Industrial engineering; Engineering; Algorithm","score_opus":0.05344946049712605,"score_gpt":0.2797444416843364,"score_spread":0.2262949811872103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2097911660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10631154,0.00024258105,0.8812642,0.00015307363,0.000028085375,0.00014894047,0.0001444181,0.0005950067,0.011112072],"genre_scores_gemma":[0.77497834,0.00033084865,0.2211721,0.00002423216,0.000010535024,0.00030653612,0.00019140255,0.00008385955,0.0029021525],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942636,0.00033361482,0.000023773884,0.000049321836,0.00012086969,0.000045979144],"domain_scores_gemma":[0.9989126,0.0007657141,0.00008627644,0.000061326136,0.00012242081,0.000051670202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008481398,0.0006198431,0.0008512732,0.0009317159,0.0006065773,0.0010357049,0.0007447916,0.0009500604,0.0026705728],"category_scores_gemma":[0.001723878,0.00087882334,0.0007713189,0.001288537,0.0006000012,0.0006862882,0.0007403176,0.00055058906,0.00028328664],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009479388,0.0000076742335,0.00022517068,0.00000750483,0.0000043941964,0.000009432413,0.0000115217745,0.99668604,0.00018898591,0.0006532549,0.000033233682,0.0021633676],"study_design_scores_gemma":[0.000004056072,0.000008021966,0.00008309985,0.000003495079,0.000002128121,0.0000037204638,0.0000077013965,0.99914885,0.00014615666,0.00033274034,0.00025698036,0.0000030497067],"about_ca_topic_score_codex":0.022451,"about_ca_topic_score_gemma":0.02386963,"teacher_disagreement_score":0.022451,"about_ca_system_score_codex":0.0014971751,"about_ca_system_score_gemma":0.001976488,"threshold_uncertainty_score":0.04464066},"labels":[],"label_agreement":null},{"id":"W2098559241","doi":"10.5555/2693848.2694254","title":"Lifecycle evaluation of building sustainability using BIM and RTLS","year":2014,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Real-time locating system; Building information modeling; Sustainability; Interoperability; Systems engineering; Computer science; Information model; Engineering; Process management; Software engineering; Operations management; Real-time computing; World Wide Web","score_opus":0.03651234318839945,"score_gpt":0.30665295611210847,"score_spread":0.270140612923709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2098559241","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23238806,0.00049912283,0.71027976,0.0003373767,0.00007062182,0.0005755891,0.0009749888,0.0052182684,0.049656227],"genre_scores_gemma":[0.7591601,0.0004212533,0.23554206,0.00005195301,0.000013673541,0.0003947732,0.001082437,0.00028088424,0.0030528961],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953419,0.0016943036,0.00016760269,0.00019832714,0.0024306446,0.00016720263],"domain_scores_gemma":[0.9979486,0.00061506627,0.00021313861,0.00035833736,0.000811853,0.000053021064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034186158,0.0006078627,0.00056547154,0.0028961871,0.0004018785,0.0019616298,0.0006739897,0.00047768536,0.0027475294],"category_scores_gemma":[0.004783324,0.00033327306,0.0005059545,0.0019192365,0.0005975466,0.0024168922,0.0015926833,0.00039025006,0.0006820263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004643797,0.0006547236,0.01976311,0.00084772916,0.00012966749,0.00030834717,0.0014264261,0.34515807,0.03115568,0.04617129,0.0044253846,0.5494952],"study_design_scores_gemma":[0.000049894894,0.00036417876,0.009572277,0.00017528381,0.000076427285,0.00017961313,0.00089862564,0.8883979,0.06003513,0.011365245,0.02877723,0.000108252265],"about_ca_topic_score_codex":0.002761168,"about_ca_topic_score_gemma":0.0024675746,"teacher_disagreement_score":0.0034186158,"about_ca_system_score_codex":0.0014386709,"about_ca_system_score_gemma":0.0010440308,"threshold_uncertainty_score":0.018079579},"labels":[],"label_agreement":null},{"id":"W2099066387","doi":"10.14796/jwmm.r215-03","title":"Continuous Modeling for Design, Construction and Monitoring: A Case Study","year":2003,"lang":"en","type":"article","venue":"Journal of Water Management Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Philips (Canada)","funders":"","keywords":"Computer science; Engineering; Systems engineering","score_opus":0.03337072385201464,"score_gpt":0.23811971025151843,"score_spread":0.20474898639950379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099066387","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6471889,0.0027403214,0.24059755,0.009360483,0.0002596541,0.0015042777,0.0005216543,0.0005964648,0.0972307],"genre_scores_gemma":[0.8407908,0.0016303093,0.14403877,0.00040217597,0.00004437345,0.00101486,0.00020358886,0.000102317426,0.011772756],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.993068,0.004790393,0.00019236752,0.00026772125,0.001272674,0.00040888196],"domain_scores_gemma":[0.9909967,0.0069645005,0.00033928364,0.0008492281,0.0003908208,0.00045949596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0070767235,0.00062213384,0.0005743579,0.0009256199,0.0036938146,0.0046210205,0.0023018967,0.00497813,0.0032207018],"category_scores_gemma":[0.008819404,0.00048293994,0.0007020867,0.0023853406,0.0028598597,0.002964765,0.0029131046,0.0025454694,0.0005189224],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007745093,0.005872362,0.017989986,0.0014374875,0.00008900644,0.015156423,0.0704214,0.17713518,0.0084726475,0.3791251,0.033026762,0.29049918],"study_design_scores_gemma":[0.00044919958,0.0029612686,0.009894887,0.0011283839,0.00013753597,0.0062428797,0.07396322,0.3471807,0.017865224,0.07890766,0.46099904,0.00026990776],"about_ca_topic_score_codex":0.0076542613,"about_ca_topic_score_gemma":0.014774854,"teacher_disagreement_score":0.0076542613,"about_ca_system_score_codex":0.003958719,"about_ca_system_score_gemma":0.003181402,"threshold_uncertainty_score":0.037425756},"labels":[],"label_agreement":null},{"id":"W2099845834","doi":"10.1109/aim.2008.4601654","title":"Development of an operation skill-training simulator for double-front work machine","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Department of Family and Community Medicine, University of Toronto; Waseda University","keywords":"Operability; Simulation; Computer science; Joystick; Driving simulator; Task (project management); Computer architecture simulator; Training (meteorology); Work (physics); Set (abstract data type); Engineering; Software engineering; Systems engineering","score_opus":0.029633581080054892,"score_gpt":0.24012766848156875,"score_spread":0.21049408740151385,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2099845834","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17956628,0.000111885936,0.80957717,0.00011335843,0.00012712309,0.001028875,0.00033028645,0.0042707874,0.004874184],"genre_scores_gemma":[0.44161516,0.000225324,0.54979265,0.000065637716,0.000027128288,0.0008644688,0.0008706136,0.00025852994,0.0062804455],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975747,0.000036979698,0.000020324322,0.00003251257,0.00012493343,0.00002773508],"domain_scores_gemma":[0.999527,0.000116239964,0.000028361816,0.00008663889,0.00013621555,0.000105570856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00042348733,0.0005808198,0.00039900592,0.0004263556,0.00016784116,0.0002659545,0.0013471146,0.00059232593,0.0036829226],"category_scores_gemma":[0.00092465075,0.0003071337,0.000492482,0.00011904832,0.00021400444,0.00047788504,0.0008648117,0.0005741012,0.0008753676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052290666,0.0018969752,0.0071347863,0.0006883092,0.0001027592,0.00055234303,0.0007059681,0.09835591,0.598919,0.003147828,0.003946473,0.28402683],"study_design_scores_gemma":[0.00038082147,0.005339514,0.015010174,0.00012823162,0.00015826129,0.001592198,0.0001864363,0.6970126,0.21519797,0.0011968078,0.063604355,0.00019265129],"about_ca_topic_score_codex":0.0009871578,"about_ca_topic_score_gemma":0.000986471,"teacher_disagreement_score":0.0036829226,"about_ca_system_score_codex":0.00018605698,"about_ca_system_score_gemma":0.00090940297,"threshold_uncertainty_score":0.012320578},"labels":[],"label_agreement":null},{"id":"W2100176012","doi":"10.1061/(asce)0887-3801(2008)22:3(192)","title":"Linear Scheduling and 4D Visualization","year":2008,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"CAD; Computer science; Schedule; Scheduling (production processes); Software; Visualization; Computer Aided Design; Software engineering; Engineering drawing; Industrial engineering; Systems engineering; Data mining; Engineering; Programming language","score_opus":0.009215984172002756,"score_gpt":0.21678498056297366,"score_spread":0.2075689963909709,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100176012","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0054365275,0.00030836588,0.97631186,0.00043105843,0.0001171812,0.000057531237,0.00013335489,0.0023973729,0.014806765],"genre_scores_gemma":[0.14128245,0.0008797978,0.8468575,0.00020778827,0.00008470455,0.00020570401,0.00037649248,0.0007240312,0.00938149],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907994,0.00038090578,0.00004356634,0.00012747508,0.00029653092,0.00007150622],"domain_scores_gemma":[0.99887985,0.0005671213,0.00010410625,0.00023036024,0.0001584114,0.000060239086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085712736,0.0008918581,0.00048621112,0.0011616517,0.0006873348,0.0025459721,0.0012313044,0.0007846529,0.013690669],"category_scores_gemma":[0.0021007513,0.0005470395,0.0008553467,0.0012483329,0.0011414808,0.0018509597,0.0021836753,0.001152285,0.0018790424],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028515415,0.00009134593,0.0014082828,0.00041677203,0.000046757115,0.00036566152,0.0018585683,0.31225246,0.017659852,0.32175037,0.011424661,0.33244008],"study_design_scores_gemma":[0.000058329744,0.00012948019,0.0005152902,0.00012593927,0.000025477155,0.0003531492,0.0004199173,0.6825914,0.01405025,0.12305391,0.17857468,0.00010216347],"about_ca_topic_score_codex":0.0059748534,"about_ca_topic_score_gemma":0.00589044,"teacher_disagreement_score":0.013690669,"about_ca_system_score_codex":0.0013604434,"about_ca_system_score_gemma":0.0016113234,"threshold_uncertainty_score":0.04579991},"labels":[],"label_agreement":null},{"id":"W2100463969","doi":"","title":"Information technology as boundary object for transformational learning","year":2009,"lang":"en","type":"article","venue":"University of Huddersfield Repository (University of Huddersfield)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"","keywords":"Knowledge management; Transformational leadership; Boundary object; Fragmentation (computing); Computer science; Collaborative learning; Knowledge sharing; Boundary (topology); Psychology; Sociology","score_opus":0.0025488375527246113,"score_gpt":0.14620605112761062,"score_spread":0.143657213574886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2100463969","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062417753,0.0030047866,0.56676626,0.0050127506,0.00050409633,0.0002665519,0.000063822976,0.0009484281,0.3610155],"genre_scores_gemma":[0.7458637,0.0018538191,0.22923365,0.00040336305,0.000084629355,0.00037170216,0.0001045726,0.00025101265,0.021833505],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9968911,0.0013740697,0.0002484781,0.00032069982,0.00092724065,0.00023834502],"domain_scores_gemma":[0.9966574,0.001637546,0.00026835784,0.0008746473,0.00026511832,0.00029701614],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002750417,0.00039426543,0.00048460258,0.002042546,0.0023671417,0.013875916,0.0013068857,0.002277543,0.007587998],"category_scores_gemma":[0.0069911256,0.00042667578,0.00055463344,0.0019031587,0.008454712,0.012678224,0.0079395,0.0015249634,0.0017289747],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030780346,0.000036331738,0.00046261473,0.00014316656,0.0000067525684,0.00027618982,0.0062529305,0.0013257181,0.0023446488,0.93247205,0.0010257348,0.055623002],"study_design_scores_gemma":[0.00004904132,0.0001105196,0.0009289636,0.00065384165,0.00003850256,0.0010745534,0.0062675662,0.013541287,0.008917391,0.7456369,0.22271365,0.0000678345],"about_ca_topic_score_codex":0.00075037475,"about_ca_topic_score_gemma":0.00041293292,"teacher_disagreement_score":0.013875916,"about_ca_system_score_codex":0.0017845436,"about_ca_system_score_gemma":0.0020564124,"threshold_uncertainty_score":0.025384367},"labels":[],"label_agreement":null},{"id":"W2101131792","doi":"10.5555/2429759.2430111","title":"Construction operations simulation under structural adequacy constraints: the Stonecutters Bridge case study","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bridge (graph theory); Perspective (graphical); Resource (disambiguation); Sequence (biology); Resource allocation; Computer science; Engineering; Bridge maintenance; Construction management; Construction engineering; Civil engineering; Structural engineering","score_opus":0.04768751709199122,"score_gpt":0.3056269249822584,"score_spread":0.2579394078902672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101131792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9839484,0.000030453342,0.010272296,0.00008864901,0.000005201374,0.000088869085,0.00022182161,0.00005898008,0.0052853147],"genre_scores_gemma":[0.98921037,0.000043642398,0.00946032,0.000009628598,0.0000022115107,0.00009744275,0.0001749419,0.00001344499,0.0009880072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932265,0.00036138343,0.000030909625,0.00006118158,0.00010901969,0.00011492087],"domain_scores_gemma":[0.9968304,0.002474259,0.00013206358,0.00018779814,0.00024948758,0.000125944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013435199,0.0005982322,0.00075300684,0.0006917327,0.0007022986,0.0011507071,0.0010226931,0.0016336045,0.0033643031],"category_scores_gemma":[0.0033353518,0.00045734688,0.00071680086,0.0012239808,0.0008133929,0.0008087187,0.00084116624,0.0008367052,0.000166324],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013024065,0.00021509534,0.0045505357,0.00003367636,0.000023246585,0.00042621462,0.0002928361,0.9877082,0.00066924375,0.0023195453,0.00015992411,0.0034712194],"study_design_scores_gemma":[0.000044432585,0.00011394914,0.0013576578,0.000006022376,0.0000131201,0.000028954999,0.00040985757,0.9963336,0.00070629735,0.00064698095,0.00032929005,0.00000994717],"about_ca_topic_score_codex":0.043954853,"about_ca_topic_score_gemma":0.04424669,"teacher_disagreement_score":0.043954853,"about_ca_system_score_codex":0.0016258346,"about_ca_system_score_gemma":0.001954888,"threshold_uncertainty_score":0.08739799},"labels":[],"label_agreement":null},{"id":"W2101483070","doi":"10.1061/9780784413616.003","title":"Interoperability between Building Design and Building Energy Analysis","year":2014,"lang":"en","type":"article","venue":"Computing in Civil and Building Engineering (2014)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Interoperability; Computer science; Parametric design; Software engineering; Building information modeling; Efficient energy use; Software; Engineering design process; Systems engineering; Engineering; Parametric statistics; World Wide Web; Operating system","score_opus":0.007568368117697864,"score_gpt":0.2034124421689871,"score_spread":0.19584407405128923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2101483070","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013586063,0.0002710994,0.9477477,0.0006410228,0.00012321271,0.00020539301,0.0014982492,0.012442638,0.023484642],"genre_scores_gemma":[0.26298812,0.0007527196,0.70549244,0.00068641274,0.00011324326,0.000742863,0.009834646,0.004555392,0.014834221],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9934104,0.0018352983,0.00066343724,0.0008149596,0.0030307965,0.00024507497],"domain_scores_gemma":[0.9854595,0.0034817674,0.00054863066,0.008620453,0.0017454178,0.00014416916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006450085,0.0010456936,0.00084083405,0.0030341418,0.00074387155,0.005030442,0.0027203916,0.0013660463,0.008304815],"category_scores_gemma":[0.015314946,0.000720451,0.0015858149,0.003157414,0.0013425888,0.0059148585,0.00514971,0.0020134777,0.0047357036],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032084863,0.0003576169,0.0061996127,0.00073345273,0.00022898962,0.0005816959,0.0022519848,0.044347484,0.013880622,0.1345669,0.023561897,0.7729688],"study_design_scores_gemma":[0.000111394555,0.00022005277,0.007035953,0.0007427671,0.0002009547,0.0013748059,0.0014177499,0.19263658,0.06667087,0.24803442,0.4812475,0.00030698793],"about_ca_topic_score_codex":0.0020214606,"about_ca_topic_score_gemma":0.0014280233,"teacher_disagreement_score":0.008304815,"about_ca_system_score_codex":0.0012279078,"about_ca_system_score_gemma":0.0020778023,"threshold_uncertainty_score":0.03411174},"labels":[],"label_agreement":null},{"id":"W2102242875","doi":"10.1109/wsc.2002.1166454","title":"Optimal construction project planning","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Component (thermodynamics); Computer science; Work (physics); Pre-construction services; Systems engineering; Construction management; Production (economics); Project planning; Engineering management; Construction engineering; Process management; Project management; Engineering","score_opus":0.013061123548307976,"score_gpt":0.22578593178838732,"score_spread":0.21272480824007933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102242875","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0437171,0.0008332591,0.9222015,0.00063601404,0.0000642228,0.00033183992,0.00048025593,0.00035687294,0.03137879],"genre_scores_gemma":[0.6266846,0.0010775388,0.3605901,0.000063169115,0.000028499204,0.00048800977,0.00075953425,0.00014802848,0.010160605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991899,0.0003058045,0.000037676116,0.00014695614,0.00016821745,0.00015154861],"domain_scores_gemma":[0.99942255,0.00029396403,0.000056315974,0.000037847934,0.00011776859,0.00007165132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011602654,0.0007172573,0.0011718649,0.0013339974,0.00074034475,0.0018465539,0.001025993,0.0012111536,0.009700503],"category_scores_gemma":[0.002407537,0.0008873275,0.0006029282,0.0015895958,0.00082202285,0.0013754672,0.00140336,0.00074918865,0.000951901],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005423553,0.000026513835,0.0005222529,0.00007708144,0.000013922249,0.00006343189,0.000064337284,0.9418242,0.0003961963,0.021804988,0.0019911414,0.033161655],"study_design_scores_gemma":[0.00002307715,0.000047443988,0.0005238866,0.00003071247,0.000013989179,0.00004095271,0.00014846347,0.9548427,0.00041262494,0.03920481,0.0046944097,0.00001703346],"about_ca_topic_score_codex":0.011252209,"about_ca_topic_score_gemma":0.017806316,"teacher_disagreement_score":0.011252209,"about_ca_system_score_codex":0.0016370184,"about_ca_system_score_gemma":0.0035710826,"threshold_uncertainty_score":0.03245145},"labels":[],"label_agreement":null},{"id":"W2102270393","doi":"10.1108/09699980310478412","title":"Photo‐net: an integrated system for controlling construction progress","year":2003,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Network for Business Sustainability","funders":"","keywords":"Computer science; Critical path method; Animation; Scheduling (production processes); Path (computing); Real-time computing; Systems engineering; Operating system; Computer graphics (images); Engineering","score_opus":0.00492735959806024,"score_gpt":0.18732480764713247,"score_spread":0.18239744804907224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102270393","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029397437,0.00044403,0.7940639,0.00018516263,0.0004576386,0.00084751524,0.00340183,0.14638174,0.02482084],"genre_scores_gemma":[0.25632042,0.00063980295,0.65864897,0.0003801972,0.00019447957,0.0015889439,0.0050756405,0.004608444,0.07254309],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993488,0.00006151978,0.000030171628,0.0001932129,0.0003283476,0.000038008486],"domain_scores_gemma":[0.9992223,0.00022412922,0.00007548806,0.00015186096,0.0002095697,0.000116618525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062670885,0.00073558267,0.00059909775,0.0013504878,0.00036663815,0.0009592117,0.0017137652,0.00055856776,0.029068038],"category_scores_gemma":[0.0012176121,0.0005955007,0.00024632583,0.000855826,0.00028679008,0.0012947657,0.0010304482,0.00051437115,0.004951114],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024054952,0.00057992333,0.005862892,0.0007764074,0.00011547346,0.0003323134,0.00046018825,0.00990274,0.1303611,0.0053620157,0.09205127,0.75179017],"study_design_scores_gemma":[0.0006409742,0.0011431348,0.024271583,0.00019027978,0.00035939526,0.0014312848,0.00025940835,0.33326545,0.21022396,0.0046820207,0.42302877,0.0005037231],"about_ca_topic_score_codex":0.003060779,"about_ca_topic_score_gemma":0.0046294476,"teacher_disagreement_score":0.029068038,"about_ca_system_score_codex":0.0005941327,"about_ca_system_score_gemma":0.0007464223,"threshold_uncertainty_score":0.097242236},"labels":[],"label_agreement":null},{"id":"W2102693609","doi":"10.1139/cjce-2014-0153","title":"Construction knowledge discovery system using fuzzy approach","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Data mining; Computer science; Knowledge base; Task (project management); Fuzzy logic; Knowledge extraction; Process (computing); Relation (database); Machine learning; Fuzzy set; Artificial intelligence; Industrial engineering; Engineering; Systems engineering","score_opus":0.0076849655397098725,"score_gpt":0.16889098319261575,"score_spread":0.16120601765290588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102693609","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024338938,0.0003953279,0.94890386,0.00066144316,0.000095633506,0.0011371657,0.0022697216,0.0082247425,0.013973204],"genre_scores_gemma":[0.18615735,0.0005558555,0.80210745,0.00020185178,0.00004531245,0.0009170256,0.003915233,0.00009903607,0.006000933],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981851,0.00020851193,0.0003326122,0.0004775121,0.0006797043,0.00011657172],"domain_scores_gemma":[0.997785,0.0008361005,0.00015673305,0.00022646443,0.00090151845,0.00009415231],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022546635,0.0006949062,0.0009784512,0.0062127607,0.0018477311,0.0030585176,0.002146699,0.001192179,0.006468397],"category_scores_gemma":[0.0055415593,0.00050511945,0.0013835409,0.0040590307,0.0004737493,0.002734148,0.0018829762,0.0008771991,0.0015977535],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047322028,0.0006687425,0.007801291,0.00089718483,0.00028437213,0.0012276116,0.0012333398,0.05606597,0.007896417,0.030896809,0.016783735,0.87577134],"study_design_scores_gemma":[0.00015201839,0.00016407412,0.003508357,0.00024454156,0.000328853,0.00079573895,0.00074674055,0.8766517,0.017893404,0.038090006,0.061281864,0.00014278422],"about_ca_topic_score_codex":0.015180598,"about_ca_topic_score_gemma":0.012140088,"teacher_disagreement_score":0.015180598,"about_ca_system_score_codex":0.0019333767,"about_ca_system_score_gemma":0.00420131,"threshold_uncertainty_score":0.030184448},"labels":[],"label_agreement":null},{"id":"W2102934494","doi":"10.1260/1478-0771.9.2.167","title":"Aviva Stadium: A Parametric Success","year":2011,"lang":"en","type":"article","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Stadium; Documentation; Identification (biology); Software; Parametric statistics; Engineering; Construction engineering; Computer science; Parametric model; Architectural engineering; Software engineering; Engineering drawing; Systems engineering; Programming language","score_opus":0.016932431879183828,"score_gpt":0.23228867149734,"score_spread":0.21535623961815617,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2102934494","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24531914,0.0116224475,0.10553036,0.010292672,0.001796365,0.00040822563,0.001958589,0.0039098905,0.6191623],"genre_scores_gemma":[0.6605813,0.0039103534,0.07977667,0.00065703853,0.00039002902,0.0002204959,0.0035761052,0.0020434314,0.2488445],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99638027,0.00043674264,0.00008778344,0.00032629565,0.0023734383,0.0003954746],"domain_scores_gemma":[0.99812394,0.00028931617,0.00006108266,0.000480333,0.00069824985,0.00034713608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003154162,0.0010822446,0.00053600577,0.0015068896,0.0028612781,0.005068821,0.0020751592,0.0013541913,0.016737938],"category_scores_gemma":[0.0038198142,0.00045910146,0.00061896764,0.001917043,0.0025338093,0.0018205581,0.0053474903,0.002188038,0.0061906776],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032572818,0.0002549779,0.010988773,0.00051621284,0.00004698381,0.0016430026,0.0069348034,0.00963843,0.017280767,0.1281034,0.07963009,0.7446369],"study_design_scores_gemma":[0.000021360069,0.0002828971,0.0066574975,0.00011271954,0.000012266593,0.00090522406,0.0009810141,0.002823261,0.00478194,0.0040189247,0.9793489,0.000053935448],"about_ca_topic_score_codex":0.030014599,"about_ca_topic_score_gemma":0.0469602,"teacher_disagreement_score":0.030014599,"about_ca_system_score_codex":0.004636973,"about_ca_system_score_gemma":0.00460477,"threshold_uncertainty_score":0.059679806},"labels":[],"label_agreement":null},{"id":"W2103542225","doi":"10.1061/9780784412329.060","title":"A Semantic Approach to Representation, Sharing, and Discovery of Construction Simulation Models","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Composability; Computer science; Interoperability; Reuse; Structuring; Metadata; Ontology; Building information modeling; Semantic Web; Information model; Data modeling; Representation (politics); Software engineering; Data science; Information retrieval; World Wide Web; Distributed computing; Engineering","score_opus":0.07197037850791876,"score_gpt":0.33439199062289715,"score_spread":0.2624216121149784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2103542225","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022561557,0.0002841318,0.98826724,0.0007729759,0.000050398008,0.00009491264,0.00018359821,0.0004988899,0.0075917984],"genre_scores_gemma":[0.101894476,0.0010718841,0.8904518,0.00031149815,0.00010878901,0.00033225882,0.0015101514,0.00022847272,0.0040906454],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9924825,0.002938814,0.00095549406,0.0008295351,0.00243323,0.0003604749],"domain_scores_gemma":[0.99484295,0.0013840267,0.00033967983,0.002350801,0.0008776037,0.00020501537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072397143,0.000806771,0.0010010855,0.008401073,0.0026174306,0.008577384,0.0031801835,0.0019459308,0.0025780997],"category_scores_gemma":[0.009357008,0.0012222519,0.00298841,0.00716519,0.005953981,0.015763212,0.0073086396,0.0028552986,0.00075116206],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030226844,0.0000491752,0.00038782158,0.00010315328,0.00004342685,0.0001809397,0.0010990798,0.0061101792,0.0009606937,0.9643882,0.0016470946,0.024999965],"study_design_scores_gemma":[0.000027705999,0.00005677593,0.0004591245,0.00027527133,0.00012546753,0.0005261811,0.0012087488,0.08178628,0.0040253047,0.7885717,0.12286283,0.000074614545],"about_ca_topic_score_codex":0.0071519553,"about_ca_topic_score_gemma":0.0075185467,"teacher_disagreement_score":0.008577384,"about_ca_system_score_codex":0.0032020388,"about_ca_system_score_gemma":0.004754345,"threshold_uncertainty_score":0.0382877},"labels":[],"label_agreement":null},{"id":"W2104308428","doi":"10.7492/ijaec.2012.003","title":"Factors Affecting Productivity of Pipe Spool Fabrication","year":2012,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Fabrication; Marine engineering; Engineering; Environmental science; Manufacturing engineering; Automotive engineering; Economics; Medicine","score_opus":0.0059267918303271515,"score_gpt":0.19951011227014834,"score_spread":0.19358332043982118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104308428","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98329663,0.00019158673,0.010986091,0.000095689684,0.000010455788,0.000074672884,0.00038980637,0.00011956034,0.0048354818],"genre_scores_gemma":[0.99675876,0.00006575128,0.0022834772,0.0000029926218,0.0000029093999,0.000014494613,0.0001402694,0.000014384668,0.0007169982],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99702686,0.0007831474,0.0002518234,0.0002618389,0.0013001614,0.00037619928],"domain_scores_gemma":[0.9716177,0.016655082,0.0052425656,0.0010242532,0.004723437,0.000736948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029410184,0.00064944965,0.000249024,0.0021061532,0.00059695175,0.0018033733,0.00055094576,0.0004954318,0.0036433497],"category_scores_gemma":[0.017939677,0.00029529,0.00039393743,0.0016688728,0.000709526,0.0010123238,0.0007346783,0.00044815475,0.0007552051],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000817342,0.0002554603,0.79523313,0.00049039884,0.00013092032,0.0013271933,0.0020021633,0.066566184,0.023100683,0.0015997698,0.0012983184,0.10717852],"study_design_scores_gemma":[0.00001549452,0.00044191044,0.9134898,0.000073567324,0.00007502889,0.0005695291,0.002669659,0.04488034,0.03262803,0.0010951797,0.003988726,0.00007258539],"about_ca_topic_score_codex":0.007475835,"about_ca_topic_score_gemma":0.0047030128,"teacher_disagreement_score":0.007475835,"about_ca_system_score_codex":0.0023729617,"about_ca_system_score_gemma":0.0015187323,"threshold_uncertainty_score":0.01721716},"labels":[],"label_agreement":null},{"id":"W2104466993","doi":"10.5555/2431518.2431928","title":"Integrating realtime project progress input into a construction simulation model","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Simulation modeling; Systems engineering; Project management; Data modeling; Industrial engineering; Constraint (computer-aided design); Project planning; Simulation; Software engineering; Engineering","score_opus":0.048601560744603374,"score_gpt":0.2811105876522935,"score_spread":0.23250902690769015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104466993","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08296647,0.000060511866,0.8943536,0.00021101067,0.00006507696,0.00032427686,0.0010955251,0.0069659627,0.0139574325],"genre_scores_gemma":[0.7751258,0.00026573727,0.21109386,0.0000456944,0.000022910901,0.0007373134,0.0021897927,0.00052133383,0.009997574],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99884415,0.00026723518,0.000116963936,0.00019297705,0.00050081656,0.00007784734],"domain_scores_gemma":[0.9981142,0.00080854294,0.00015699932,0.0002848076,0.0005677926,0.000067665416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014818587,0.00085957936,0.00065537175,0.0010099846,0.00037036082,0.0018850734,0.0013695485,0.0008341717,0.005373575],"category_scores_gemma":[0.0038867395,0.00065801694,0.0006814945,0.00082329515,0.0004056805,0.0016416385,0.0010306283,0.00086952065,0.00090576144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092720846,0.00008418531,0.0021708831,0.00004164456,0.000016048305,0.000058835874,0.00012620105,0.97681844,0.002381506,0.004630001,0.00059376523,0.012985889],"study_design_scores_gemma":[0.000013277377,0.000026515945,0.00026668093,0.000007670627,0.000011079601,0.000012599548,0.000019657735,0.9942425,0.0019877253,0.0009036713,0.0024961887,0.000012424539],"about_ca_topic_score_codex":0.010743125,"about_ca_topic_score_gemma":0.0056842524,"teacher_disagreement_score":0.010743125,"about_ca_system_score_codex":0.001327368,"about_ca_system_score_gemma":0.0023104225,"threshold_uncertainty_score":0.021361172},"labels":[],"label_agreement":null},{"id":"W2104775765","doi":"","title":"IMPLEMENTATION OF A DISTRIBUTED, MODEL-BASED INTEGRATED ASSET MANAGEMENT SYSTEM","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Public Works and Government Services Canada","keywords":"Interoperability; Computer science; Software engineering; Systems engineering; Asset management; Data exchange; Reference architecture; Software architecture; Database; Software; Engineering; Operating system","score_opus":0.007817523708784089,"score_gpt":0.2219679602187689,"score_spread":0.21415043650998483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2104775765","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040418316,0.0000629336,0.9190714,0.00027481662,0.00007197366,0.00037067317,0.00026151407,0.025307879,0.014160526],"genre_scores_gemma":[0.36334348,0.0001431041,0.6263866,0.00016750442,0.000023800787,0.00041344189,0.001553676,0.000625098,0.0073433025],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990097,0.00012220269,0.00008673215,0.00018200492,0.00051864743,0.000080734695],"domain_scores_gemma":[0.99924195,0.00010085264,0.000042169002,0.00031286056,0.00022518153,0.00007705284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014457585,0.0003588252,0.00067108654,0.00070141634,0.0005379261,0.0017430893,0.0020095147,0.0007766781,0.004151289],"category_scores_gemma":[0.0019438622,0.00035417848,0.00041418622,0.00049469585,0.00042469005,0.0015803213,0.0015518264,0.0010367162,0.0013393513],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006216544,0.0017332259,0.0073019643,0.00042430806,0.00019812315,0.0013918881,0.0018916376,0.15341812,0.096783705,0.06377296,0.020704692,0.6517577],"study_design_scores_gemma":[0.0003928775,0.0005459367,0.0029886405,0.000104891835,0.00013466504,0.00056424673,0.0002599326,0.828659,0.051899116,0.012590623,0.101753615,0.00010639419],"about_ca_topic_score_codex":0.0026373975,"about_ca_topic_score_gemma":0.0022487394,"teacher_disagreement_score":0.004151289,"about_ca_system_score_codex":0.0009079458,"about_ca_system_score_gemma":0.0018673633,"threshold_uncertainty_score":0.013887405},"labels":[],"label_agreement":null},{"id":"W2105004520","doi":"10.1061/9780784413517.170","title":"An Automatic Scheduling Approach: Building Information Modeling-based Onsite Scheduling for Panelized Construction","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Schedule; Scheduling (production processes); Modular design; Computer science; Application programming interface; Construction management; Software engineering; Systems engineering; User interface; Engineering; Construction engineering; Operating system; Civil engineering; Operations management","score_opus":0.03457006351762062,"score_gpt":0.3043029006371238,"score_spread":0.2697328371195032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105004520","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059164083,0.000030081477,0.98767614,0.000045880544,0.000019050036,0.00008029059,0.00018249523,0.0024885358,0.0035611326],"genre_scores_gemma":[0.15407321,0.0001246007,0.8410799,0.000036227,0.000012908317,0.0002547572,0.0010567387,0.00053057616,0.0028310043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995034,0.000118100244,0.000027988017,0.00008723277,0.00020988911,0.000053321983],"domain_scores_gemma":[0.99966025,0.00009535631,0.000044415014,0.00009017767,0.000087237975,0.000022537237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064560404,0.0008569971,0.0005425856,0.00092388276,0.00060302735,0.0011863642,0.0014339807,0.0006335552,0.004316167],"category_scores_gemma":[0.0011843449,0.0005582585,0.0010262429,0.0009317301,0.00039665116,0.00097385637,0.0011165204,0.00071075873,0.000956093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000120319375,0.00017638269,0.0010469946,0.00021058708,0.000049181064,0.00022467495,0.00047533892,0.76463544,0.014863905,0.037654925,0.006166471,0.17437583],"study_design_scores_gemma":[0.0000112564,0.000022842163,0.00016199518,0.000011304974,0.000013614039,0.00003174458,0.000052252482,0.98199993,0.004483593,0.003894479,0.009305699,0.0000112353155],"about_ca_topic_score_codex":0.011130135,"about_ca_topic_score_gemma":0.01621122,"teacher_disagreement_score":0.011130135,"about_ca_system_score_codex":0.001007201,"about_ca_system_score_gemma":0.0019937113,"threshold_uncertainty_score":0.022130668},"labels":[],"label_agreement":null},{"id":"W2105280861","doi":"10.1061/9780784412329.019","title":"A Conceptual Model to Develop a Worker Performance Measurement Tool to Improve Construction Productivity","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Productivity; Index (typography); Construction industry; Supervisor; Knowledge management; Computer science; Performance management; Business; Process management; Engineering; Marketing; Economics; Construction engineering; Management; Economic growth","score_opus":0.06915757848174153,"score_gpt":0.2981003998236081,"score_spread":0.22894282134186655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105280861","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02785962,0.0015394292,0.867282,0.0130032245,0.00027896097,0.0027093152,0.0013187121,0.0005420114,0.08546671],"genre_scores_gemma":[0.21782285,0.0014766224,0.7661845,0.0008052898,0.000057751073,0.0050071278,0.0014475614,0.00004856917,0.0071496787],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9972938,0.0014713616,0.00020920893,0.00029251823,0.0005782099,0.00015485958],"domain_scores_gemma":[0.9967997,0.0016570713,0.0002924651,0.00013297146,0.0009075539,0.00021014063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069271354,0.0013497042,0.0005150489,0.00405214,0.0013578449,0.0045504794,0.0029855457,0.0025514404,0.0065228855],"category_scores_gemma":[0.0054657483,0.00051534816,0.0012114558,0.0036332945,0.0021662628,0.0063082846,0.002057077,0.0022276645,0.0013938773],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060150767,0.00037123958,0.0049349833,0.0008717719,0.00005465212,0.00046927246,0.010270887,0.022973357,0.0013059811,0.8834099,0.008694277,0.066583596],"study_design_scores_gemma":[0.0001805944,0.000781031,0.0087537,0.004933308,0.00019293683,0.0010240008,0.022407824,0.24303193,0.0020622965,0.44452292,0.2719041,0.0002053753],"about_ca_topic_score_codex":0.009548718,"about_ca_topic_score_gemma":0.0074048047,"teacher_disagreement_score":0.009548718,"about_ca_system_score_codex":0.005197843,"about_ca_system_score_gemma":0.008239241,"threshold_uncertainty_score":0.03771311},"labels":[],"label_agreement":null},{"id":"W2105945972","doi":"10.5555/2433508.2433904","title":"3D CAD modeling and visualization of the tunnel construction process in a distributed simulation environment","year":2010,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; University of Alberta","funders":"","keywords":"Visualization; Computer science; Process (computing); CAD; Building information modeling; Animation; Systems engineering; Software engineering; Computer animation; Computer Aided Design; Solid modeling; Simulation modeling; Engineering; Engineering drawing; Data mining","score_opus":0.013846908139745628,"score_gpt":0.24258463882657424,"score_spread":0.22873773068682862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2105945972","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1157684,0.00016695024,0.86008656,0.00034007314,0.000049057635,0.00013179159,0.00045533423,0.0039796494,0.01902218],"genre_scores_gemma":[0.79169434,0.00036785807,0.19949235,0.000046297464,0.000014703169,0.00019678514,0.00042501435,0.00021060665,0.0075519825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997718,0.0000656616,0.0000094544375,0.000024204903,0.00010847907,0.000020520447],"domain_scores_gemma":[0.9997228,0.00012457372,0.000020728061,0.000049311115,0.000059211496,0.000023379247],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040268825,0.0004499871,0.00035879202,0.00064614974,0.00042688777,0.0012596402,0.00059658516,0.0007698547,0.0048957393],"category_scores_gemma":[0.00072576577,0.00029790477,0.0005164544,0.0005862184,0.0005354632,0.0004578156,0.0008026907,0.00046947433,0.00044082451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013909912,0.00009826855,0.0020762973,0.000097398064,0.000019863737,0.0003352511,0.0008899352,0.91906667,0.017593158,0.016590485,0.0017751831,0.041318428],"study_design_scores_gemma":[0.000040915493,0.000042996264,0.0012398114,0.000022511926,0.000014321493,0.00011062755,0.00011832382,0.98427147,0.005014506,0.0023878263,0.0067101726,0.000026589507],"about_ca_topic_score_codex":0.0167573,"about_ca_topic_score_gemma":0.019360982,"teacher_disagreement_score":0.0167573,"about_ca_system_score_codex":0.00064867456,"about_ca_system_score_gemma":0.0014247254,"threshold_uncertainty_score":0.033319533},"labels":[],"label_agreement":null},{"id":"W2106145744","doi":"10.5555/510378.510656","title":"Simphony: an integrated environment for construction simulation","year":2000,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":92,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Animation; Software engineering; Systems engineering; Representation (politics); User Friendly; Computer animation; Human–computer interaction; Engineering; Programming language","score_opus":0.019761290839140116,"score_gpt":0.2403198047283354,"score_spread":0.22055851388919528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106145744","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037303409,0.0002562056,0.9139564,0.00011628834,0.000112073416,0.0002012746,0.0016418502,0.061574098,0.018411487],"genre_scores_gemma":[0.08145536,0.0012091686,0.86535764,0.0003048598,0.00012766708,0.0017891141,0.010550787,0.021308703,0.017896844],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988821,0.00030672047,0.00007793275,0.00011028812,0.0005119499,0.00011111327],"domain_scores_gemma":[0.9990608,0.00044361278,0.00005028817,0.00020344851,0.0001372882,0.00010451211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017426542,0.00091842416,0.0011769504,0.0014261303,0.0005538672,0.0017438037,0.0028193775,0.0012321408,0.033056475],"category_scores_gemma":[0.0026598298,0.0011480948,0.0013018858,0.0013832459,0.0006849882,0.00247101,0.0034617074,0.0017497245,0.009737217],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010953407,0.00038899493,0.0028868527,0.0012031485,0.00025059175,0.0009278508,0.0014906189,0.25637445,0.021601476,0.119680725,0.14302391,0.451076],"study_design_scores_gemma":[0.00028210913,0.00015997187,0.0009537069,0.00018488223,0.000058473415,0.0005059181,0.00011521177,0.4726362,0.016308133,0.027763277,0.4809012,0.00013092758],"about_ca_topic_score_codex":0.0012896421,"about_ca_topic_score_gemma":0.0015077515,"teacher_disagreement_score":0.033056475,"about_ca_system_score_codex":0.00053803634,"about_ca_system_score_gemma":0.0010641757,"threshold_uncertainty_score":0.110584915},"labels":[],"label_agreement":null},{"id":"W2106384226","doi":"","title":"CASE STUDIES ON THE USE OF INFORMATION TECHNOLOGY IN THE CANADIAN CONSTRUCTION INDUSTRY","year":2004,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Compendium; Engineering; Engineering management; Workflow; Architecture; Computer science; World Wide Web","score_opus":0.01800397573966054,"score_gpt":0.2245304942905523,"score_spread":0.20652651855089177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2106384226","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94291335,0.0019199715,0.0038657573,0.0013193305,0.000034279725,0.0008614803,0.0004794725,0.000021451335,0.048584945],"genre_scores_gemma":[0.978109,0.0027098954,0.008165573,0.00023374765,0.000006379305,0.00030017484,0.00038192258,0.000014871576,0.010078426],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99203897,0.0028368959,0.00030121958,0.00030762644,0.0027431864,0.0017721234],"domain_scores_gemma":[0.9900557,0.0044781677,0.00058924465,0.00038344672,0.0035569875,0.00093644677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004169698,0.00067370717,0.0004926517,0.0045962385,0.018783601,0.0033858921,0.0023157452,0.0018865059,0.002972649],"category_scores_gemma":[0.010755726,0.00053262134,0.0004642261,0.011448051,0.003703748,0.0011801353,0.002699389,0.0010709,0.0002586024],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059109105,0.0010300095,0.12921129,0.0019348515,0.0001425675,0.061781935,0.5511186,0.016828695,0.0051129335,0.035973404,0.018954966,0.17731977],"study_design_scores_gemma":[0.00006186064,0.00036508346,0.08971134,0.0012665761,0.00012149683,0.0070898016,0.6940855,0.005529271,0.003952581,0.0020270746,0.19561309,0.00017637404],"about_ca_topic_score_codex":0.9322919,"about_ca_topic_score_gemma":0.9814657,"teacher_disagreement_score":0.067708075,"about_ca_system_score_codex":0.05758501,"about_ca_system_score_gemma":0.039309897,"threshold_uncertainty_score":0.41781044},"labels":[],"label_agreement":null},{"id":"W2107426637","doi":"10.1139/l01-004","title":"Performance measurement indices for simulated construction operations","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Process (computing); Key (lock); Probabilistic logic; Range (aeronautics); Industrial engineering; Performance prediction; Reliability engineering; Artificial intelligence; Machine learning; Simulation; Engineering","score_opus":0.01261772601370272,"score_gpt":0.18037044343119316,"score_spread":0.16775271741749043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107426637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25117514,0.00021555246,0.71671087,0.0002705176,0.0001017298,0.00082212244,0.0022020913,0.0023639707,0.026138082],"genre_scores_gemma":[0.8218984,0.0001248202,0.17374392,0.000027478207,0.000010991633,0.00078386074,0.001768717,0.0001461459,0.001495732],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99711776,0.0012001095,0.00025018526,0.00023290447,0.0010817113,0.000117299285],"domain_scores_gemma":[0.98933893,0.0056678387,0.0012788625,0.0010143841,0.0024972667,0.00020274258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004922478,0.00075339875,0.00045338552,0.002606255,0.0004106978,0.0011568498,0.0007033592,0.0004623243,0.0025678962],"category_scores_gemma":[0.022518225,0.00021624366,0.00045480428,0.0022181144,0.00044847676,0.001272455,0.0008205586,0.00093442464,0.0005338361],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033173422,0.00040030453,0.013059624,0.00014750347,0.00005516366,0.00003740842,0.00027850352,0.8848821,0.0023173299,0.019043365,0.0021820054,0.07726501],"study_design_scores_gemma":[0.000027988874,0.00036778775,0.0060314448,0.000031253247,0.000022405111,0.000025329115,0.00012098396,0.97966856,0.0044485005,0.005797328,0.0034187622,0.00003966539],"about_ca_topic_score_codex":0.0042891,"about_ca_topic_score_gemma":0.0036532816,"teacher_disagreement_score":0.004922478,"about_ca_system_score_codex":0.0020956115,"about_ca_system_score_gemma":0.0010195903,"threshold_uncertainty_score":0.026032865},"labels":[],"label_agreement":null},{"id":"W2107642345","doi":"10.5555/2675983.2676364","title":"Location-aware real-time simulation framework for earthmoving projects using automated machine guidance","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Context (archaeology); Identification (biology); Retrofitting; Computer science; Construction industry; Systems engineering; Engineering; Industrial engineering; Construction engineering","score_opus":0.01528824604090179,"score_gpt":0.26300224463466065,"score_spread":0.24771399859375887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107642345","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009636779,0.000059232596,0.9858342,0.000073794086,0.000020551255,0.00005330855,0.00008560338,0.0021296665,0.0021069827],"genre_scores_gemma":[0.55597234,0.00034681687,0.4391391,0.000059823484,0.000031929907,0.00046557622,0.00043341238,0.00034176558,0.0032092424],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996655,0.000097065866,0.000024599223,0.000056354005,0.0001169318,0.000039584065],"domain_scores_gemma":[0.99961025,0.00015113653,0.000053171883,0.000050279177,0.000085852924,0.000049373743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008371725,0.0008416685,0.0009728145,0.00073360396,0.0006621939,0.0015842099,0.002214095,0.0011428217,0.0034567774],"category_scores_gemma":[0.0012748246,0.0006037479,0.0010759605,0.00051628257,0.0006844851,0.001147154,0.0012215129,0.0010097375,0.00053032854],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003710149,0.00003941238,0.00049130985,0.00003535205,0.000020793797,0.0000789457,0.00009965824,0.9753414,0.0016624817,0.012042265,0.00050859933,0.009642733],"study_design_scores_gemma":[0.0000063826087,0.000005963731,0.000034557306,0.0000032500338,0.000004240412,0.000010612172,0.000008379777,0.9973918,0.00027437467,0.0011224814,0.0011337635,0.0000040720965],"about_ca_topic_score_codex":0.015739119,"about_ca_topic_score_gemma":0.014845296,"teacher_disagreement_score":0.015739119,"about_ca_system_score_codex":0.0010629477,"about_ca_system_score_gemma":0.0017002852,"threshold_uncertainty_score":0.031295},"labels":[],"label_agreement":null},{"id":"W2107712205","doi":"10.22260/isarc2009/0045","title":"Impact of Fast Automated Tracking of Construction Components on Labor Productivity","year":2009,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Productivity; Tracking (education); Computer science; Automation; Engineering; Economics; Mechanical engineering","score_opus":0.010635980976854153,"score_gpt":0.23468409556212086,"score_spread":0.22404811458526672,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2107712205","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9954691,0.0001256533,0.0020701867,0.00006193965,0.000014649123,0.000031493535,0.00011007755,0.00007366544,0.002043293],"genre_scores_gemma":[0.99716115,0.000060501694,0.0019888026,0.00001420425,0.000007302816,0.00002063937,0.000096953074,0.00001602336,0.0006344761],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9955859,0.0016249733,0.00021105474,0.00040140937,0.0017167688,0.0004599228],"domain_scores_gemma":[0.97483975,0.016604498,0.0032453137,0.0023353216,0.002535947,0.00043920692],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027534072,0.00056072226,0.00033419285,0.001017998,0.00061259314,0.0014177887,0.0005881991,0.0007169703,0.0034178216],"category_scores_gemma":[0.013765193,0.00025211173,0.00038118506,0.00098545,0.0006820533,0.0006833998,0.0010718808,0.0004184491,0.00067962584],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005937376,0.0033033194,0.19676474,0.0006428852,0.00023160328,0.00056671834,0.0011788423,0.1468588,0.055601016,0.0011824865,0.0018920449,0.5858402],"study_design_scores_gemma":[0.00022117374,0.011541267,0.8501254,0.00014231801,0.00024151504,0.0003642743,0.0021472813,0.07021987,0.056564514,0.001984844,0.006301847,0.00014576621],"about_ca_topic_score_codex":0.005472845,"about_ca_topic_score_gemma":0.005664346,"teacher_disagreement_score":0.005472845,"about_ca_system_score_codex":0.0013539683,"about_ca_system_score_gemma":0.0013449212,"threshold_uncertainty_score":0.0145615935},"labels":[],"label_agreement":null},{"id":"W2109097342","doi":"10.5555/2675983.2676375","title":"Simulation and optimization of temporary road network in mass earthmoving projects","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"North American Construction Group (Canada); University of Alberta","funders":"","keywords":"Haulage; Linear programming; Duration (music); Transport engineering; Engineering; Total cost; Computer science; Operations research; Algorithm","score_opus":0.02046858000852035,"score_gpt":0.23057036856741417,"score_spread":0.21010178855889383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109097342","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8338506,0.0002600154,0.14183778,0.00031020225,0.00005514464,0.00013390816,0.000569342,0.00028975488,0.022693109],"genre_scores_gemma":[0.9807341,0.00015372416,0.015450446,0.000015795762,0.0000036259844,0.00010863502,0.00016113106,0.000030047642,0.0033424913],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997725,0.000083201216,0.000008258149,0.000029655866,0.000032562522,0.00007392077],"domain_scores_gemma":[0.99937856,0.00038560346,0.00006296686,0.000027269318,0.00007576768,0.00006972861],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050763146,0.0005801788,0.0007855091,0.0005644342,0.0005976483,0.000891328,0.0006768358,0.0011090782,0.0033440574],"category_scores_gemma":[0.0011816774,0.00043252096,0.00078652287,0.0008085781,0.0006180621,0.0006247471,0.0007188661,0.0006277541,0.00018300745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011384301,0.000007599782,0.0002117502,0.000003932055,0.0000017752391,0.000012913162,0.000004860582,0.99884653,0.00007841545,0.00033341587,0.00002974317,0.00045772427],"study_design_scores_gemma":[0.0000045658653,0.000014429494,0.00011611901,0.0000013595238,0.0000021122303,0.0000024632452,0.000015876742,0.99945575,0.000108257744,0.0001768553,0.00010048774,0.0000017325326],"about_ca_topic_score_codex":0.027007455,"about_ca_topic_score_gemma":0.020964168,"teacher_disagreement_score":0.027007455,"about_ca_system_score_codex":0.0010658111,"about_ca_system_score_gemma":0.0013759945,"threshold_uncertainty_score":0.053700507},"labels":[],"label_agreement":null},{"id":"W2109368067","doi":"10.5555/2675983.2676379","title":"A discrete event simulation model of asphalt paving operations","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Computer science; Simulation modeling; Construction industry; Asphalt; Construction engineering; Engineering; Risk analysis (engineering); Systems engineering; Simulation","score_opus":0.02602556855087651,"score_gpt":0.2619071963162307,"score_spread":0.2358816277653542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109368067","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09933497,0.00031727826,0.849108,0.0010871979,0.00022766663,0.00031373324,0.0037538696,0.0018524893,0.044004764],"genre_scores_gemma":[0.8912066,0.00061530614,0.07166302,0.00010611363,0.00005540607,0.0005947558,0.0020288553,0.00013963574,0.03359027],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955827,0.0001318423,0.00003498781,0.000089809226,0.00012315487,0.00006187498],"domain_scores_gemma":[0.99934,0.00034866715,0.00006673832,0.000061233826,0.0001124439,0.00007090991],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058415,0.00079653366,0.0008772204,0.0008053865,0.00066195003,0.0023407803,0.0019579988,0.0021665455,0.01015848],"category_scores_gemma":[0.0016420401,0.0006216126,0.0010999894,0.0011237534,0.00070802786,0.001927529,0.00088053744,0.0015338339,0.0013021587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044457844,0.000036463494,0.00038980247,0.000015270263,0.00001160799,0.0000614601,0.000033936183,0.98643655,0.00041347032,0.010707493,0.0002997817,0.00154968],"study_design_scores_gemma":[0.000017648295,0.000018036138,0.00010027567,0.0000037086802,0.0000066692546,0.000013480272,0.000012743697,0.99556077,0.0001896119,0.0026575653,0.0014120153,0.0000073979786],"about_ca_topic_score_codex":0.025382303,"about_ca_topic_score_gemma":0.012863548,"teacher_disagreement_score":0.025382303,"about_ca_system_score_codex":0.001306735,"about_ca_system_score_gemma":0.0023378313,"threshold_uncertainty_score":0.05046916},"labels":[],"label_agreement":null},{"id":"W2109524929","doi":"10.1016/j.autcon.2006.07.009","title":"Cell-based representation and analysis of spatial resources in construction simulation","year":2006,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Representation (politics); Visualization; Discrete event simulation; Computer science; Resource (disambiguation); Space (punctuation); Industrial engineering; Simulation modeling; Data mining; Systems engineering; Operations research; Simulation; Engineering; Mathematics","score_opus":0.005391978941744774,"score_gpt":0.21942441947591912,"score_spread":0.21403244053417433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109524929","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11672027,0.00023009564,0.8713132,0.00018075733,0.000040792856,0.000039868984,0.00034918342,0.0004033524,0.010722379],"genre_scores_gemma":[0.9203335,0.00030616342,0.076294586,0.000029932464,0.0000122857355,0.00008308518,0.00028260454,0.000095974996,0.0025617594],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998386,0.00004451505,0.000008891598,0.000018706527,0.00006190779,0.000027417656],"domain_scores_gemma":[0.9997029,0.00013763976,0.000022137436,0.00003921745,0.000075250944,0.000022894805],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031042815,0.00026753763,0.00071377936,0.0007100384,0.0005033828,0.0017185246,0.0009972516,0.00074311625,0.0022710327],"category_scores_gemma":[0.0011048081,0.00032894127,0.0004842703,0.0012989857,0.0007107825,0.0008450831,0.00072215375,0.00048167887,0.000420372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014657621,0.000015663172,0.0004600143,0.0000127761705,0.000008604347,0.00002286622,0.00005844509,0.9648851,0.0011068961,0.027857492,0.00018625481,0.0053711827],"study_design_scores_gemma":[0.0000013913118,0.000002389489,0.00006418014,0.0000015490122,0.0000020931886,0.0000044673557,0.000013514455,0.9957826,0.00032444252,0.0033262065,0.00047460455,0.0000025636307],"about_ca_topic_score_codex":0.02719322,"about_ca_topic_score_gemma":0.016695855,"teacher_disagreement_score":0.02719322,"about_ca_system_score_codex":0.0010566969,"about_ca_system_score_gemma":0.0010402843,"threshold_uncertainty_score":0.054069877},"labels":[],"label_agreement":null},{"id":"W2109702797","doi":"10.5555/1030453.1030716","title":"CEPM 1: selecting earthmoving equipment fleets using genetic algorithms","year":2002,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Genetic algorithm; Computer science; Algorithm; Engineering; Mathematical optimization; Mathematics; Machine learning","score_opus":0.04712280526830158,"score_gpt":0.25262500817074635,"score_spread":0.20550220290244475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109702797","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08538768,0.00014738204,0.9018036,0.00018644914,0.000035631027,0.00023098697,0.00014130728,0.00092474825,0.011142288],"genre_scores_gemma":[0.40331292,0.00018310662,0.5906695,0.000106257234,0.000020519557,0.0003733512,0.00037465864,0.00017382258,0.0047859102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997117,0.00009686783,0.00000971961,0.00004626952,0.00009447042,0.000040920695],"domain_scores_gemma":[0.999665,0.00015760522,0.000035148576,0.000035753226,0.0000851799,0.000021258573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006600642,0.00073690875,0.00067235954,0.0008571036,0.00046781386,0.0007915553,0.0010261803,0.0009916396,0.0024833395],"category_scores_gemma":[0.0019712474,0.00031677017,0.00046168416,0.0006836932,0.00039001746,0.00054847426,0.00067811034,0.0005091844,0.00036903072],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005163746,0.0000658049,0.0013893733,0.000037531994,0.000028312159,0.00008419433,0.00004414916,0.92196953,0.0026333972,0.0062382175,0.001122133,0.06633573],"study_design_scores_gemma":[0.000017509692,0.00004140978,0.0002840761,0.000009443664,0.00001035849,0.000027215743,0.000018109877,0.99431616,0.00178431,0.001820477,0.0016647491,0.0000060826105],"about_ca_topic_score_codex":0.0057516233,"about_ca_topic_score_gemma":0.0051100575,"teacher_disagreement_score":0.0057516233,"about_ca_system_score_codex":0.0007032272,"about_ca_system_score_gemma":0.0012589187,"threshold_uncertainty_score":0.011436284},"labels":[],"label_agreement":null},{"id":"W2109838160","doi":"10.1520/stp10930s","title":"Connectivity of the Air Barrier and Building Envelope System: Materials, Process, and Quality Assurance","year":2003,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Quality assurance; Building envelope; Envelope (radar); Process (computing); Architectural engineering; Quality (philosophy); Computer science; Environmental science; Engineering; Telecommunications; Physics; Operations management; Meteorology; Operating system","score_opus":0.01009407873205208,"score_gpt":0.21035844285060004,"score_spread":0.20026436411854795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2109838160","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011514025,0.016024664,0.33050665,0.0012139529,0.0005364332,0.0002040384,0.00013441636,0.0011014024,0.6387644],"genre_scores_gemma":[0.10407103,0.019948782,0.29325503,0.0005251953,0.00024934704,0.00033180072,0.00061331876,0.0011113217,0.57989424],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995757,0.00005627687,0.000017639988,0.000049531674,0.00027705042,0.000023858072],"domain_scores_gemma":[0.99971896,0.000120120225,0.00002041994,0.00004235062,0.0000801483,0.000017919047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005179447,0.00064910844,0.0003758877,0.00078611827,0.0005496513,0.0032664118,0.00093015167,0.0007334072,0.009431567],"category_scores_gemma":[0.00090142264,0.00052322354,0.00026815818,0.0012109256,0.0010907566,0.0025144694,0.0010299463,0.0013419043,0.0037311283],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028533574,0.000057085737,0.00037538793,0.0005245351,0.000007660141,0.00045308875,0.0017352689,0.0063645435,0.013159662,0.51487464,0.028982846,0.43343675],"study_design_scores_gemma":[0.0000054421157,0.000063087675,0.0011375188,0.000272025,0.000011631424,0.001682626,0.0003162162,0.0057383445,0.010720655,0.076114945,0.9039169,0.000020531515],"about_ca_topic_score_codex":0.001442348,"about_ca_topic_score_gemma":0.0018703181,"teacher_disagreement_score":0.009431567,"about_ca_system_score_codex":0.0010247461,"about_ca_system_score_gemma":0.0010487235,"threshold_uncertainty_score":0.03155172},"labels":[],"label_agreement":null},{"id":"W2110126810","doi":"10.5555/2431518.2431944","title":"Loosely coupled visualization of industrial construction simulation using a gaming engine","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Computer science; Pipeline (software); Distributed Interactive Simulation; Interactive simulation; Window (computing); Data visualization; Virtual reality; Distributed computing; Human–computer interaction; Simulation; Data mining; World Wide Web; Operating system","score_opus":0.08870577620897836,"score_gpt":0.2772172643071387,"score_spread":0.18851148809816037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110126810","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12088813,0.000083495805,0.8563359,0.00018063169,0.000050027422,0.00021114136,0.00025294282,0.008201613,0.013796105],"genre_scores_gemma":[0.6226167,0.00018522741,0.36834952,0.000071048176,0.000016279497,0.00026296917,0.00049808586,0.0008045007,0.0071956934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996037,0.000169854,0.000025558493,0.000045765966,0.00011800198,0.000037225425],"domain_scores_gemma":[0.99947256,0.0002130356,0.000025020883,0.000116604475,0.00009127644,0.000081586855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054588896,0.00063689676,0.00035552977,0.00054315507,0.0003945632,0.0015628559,0.00095513347,0.00051810243,0.0040177144],"category_scores_gemma":[0.0012220418,0.00037005925,0.0006520035,0.00042862276,0.00039306658,0.0007014885,0.0017061244,0.0007301665,0.0004904465],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008334581,0.0004412204,0.008241782,0.00025817024,0.0001563064,0.001133704,0.0036128922,0.6236176,0.15804201,0.055343885,0.0056410595,0.14267792],"study_design_scores_gemma":[0.00005398865,0.00013445666,0.0027686104,0.000031988406,0.00003090763,0.00014237213,0.0001537174,0.9499962,0.022483665,0.0076348553,0.016502813,0.00006639242],"about_ca_topic_score_codex":0.005637721,"about_ca_topic_score_gemma":0.0057855295,"teacher_disagreement_score":0.005637721,"about_ca_system_score_codex":0.00059731025,"about_ca_system_score_gemma":0.0008439192,"threshold_uncertainty_score":0.013440609},"labels":[],"label_agreement":null},{"id":"W2110449433","doi":"10.1007/bf02480835","title":"International Conference on Performance of Construction Materials in the New Millennium (ICPCM)","year":2003,"lang":"en","type":"article","venue":"Materials and Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; Stantec (Canada)","funders":"","keywords":"Solid mechanics; Engineering; Construction engineering; Forensic engineering; Engineering physics; Materials science; Composite material","score_opus":0.012065011124676858,"score_gpt":0.21059047905816966,"score_spread":0.1985254679334928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2110449433","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0378412,0.06618064,0.1149828,0.05328728,0.032549985,0.0004464887,0.0025172576,0.0019218079,0.69027257],"genre_scores_gemma":[0.18538631,0.04079701,0.12135211,0.003481185,0.0040709735,0.0004992027,0.005300762,0.0008544906,0.63825786],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971802,0.00049864326,0.00006406515,0.00024401235,0.0016641523,0.00034900094],"domain_scores_gemma":[0.998145,0.0002010858,0.000065595224,0.00025824213,0.0009430317,0.00038719404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005567501,0.00087257294,0.0006676348,0.0012882149,0.0008189693,0.0032890877,0.0014625131,0.0017854738,0.033865027],"category_scores_gemma":[0.0024174028,0.000265716,0.0004987293,0.0020984015,0.000856322,0.0025894272,0.0033935306,0.0017621113,0.0062926235],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023906628,0.0002953143,0.0015339024,0.00035894656,0.000026985457,0.00017889713,0.00022511174,0.0036004726,0.005144674,0.07459529,0.45487568,0.4589257],"study_design_scores_gemma":[0.000011756803,0.00009183304,0.0018152406,0.00013024763,0.0000110271385,0.00018223374,0.00013283503,0.002627147,0.0032901843,0.00560478,0.9860925,0.000010231071],"about_ca_topic_score_codex":0.004827224,"about_ca_topic_score_gemma":0.005155741,"teacher_disagreement_score":0.033865027,"about_ca_system_score_codex":0.00220651,"about_ca_system_score_gemma":0.0064703887,"threshold_uncertainty_score":0.11328983},"labels":[],"label_agreement":null},{"id":"W2111346917","doi":"10.5555/1516744.1517176","title":"Simulation of modular building construction","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Modular construction; Process (computing); Construction management; Quality (philosophy); Software; Systems engineering; Software engineering; Engineering; Civil engineering; Operating system","score_opus":0.026359222299043944,"score_gpt":0.24473669673426554,"score_spread":0.2183774744352216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2111346917","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49387574,0.00025899516,0.43385583,0.00037551767,0.000096527176,0.00017606237,0.0012210747,0.0012958535,0.06884438],"genre_scores_gemma":[0.964583,0.00015301799,0.02798758,0.000022840797,0.000008665611,0.0001516301,0.00042904456,0.000097279815,0.0065670805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997242,0.00008971626,0.0000113662045,0.000035850062,0.00008053289,0.000058347654],"domain_scores_gemma":[0.9992945,0.00039389313,0.00006294943,0.000065944965,0.00011263713,0.00007005193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044864672,0.00053523335,0.0005875595,0.0005667493,0.0004072888,0.0007438163,0.0008002948,0.0009220673,0.005421824],"category_scores_gemma":[0.0016796171,0.00039870405,0.0007453571,0.00073918473,0.00070514175,0.00052316074,0.0008795019,0.00042365934,0.00055068906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015939811,0.000007580394,0.00038192084,0.00000754691,0.0000032342427,0.000013173974,0.000017451217,0.9964057,0.00029618375,0.0016738395,0.00007437808,0.001103025],"study_design_scores_gemma":[0.0000069435387,0.00001078604,0.00015402072,0.0000024638412,0.0000019895563,0.000006119213,0.0000097464845,0.99812585,0.00025087563,0.00087059604,0.0005575572,0.0000029588887],"about_ca_topic_score_codex":0.010655808,"about_ca_topic_score_gemma":0.0067662094,"teacher_disagreement_score":0.010655808,"about_ca_system_score_codex":0.00088064023,"about_ca_system_score_gemma":0.0010369982,"threshold_uncertainty_score":0.021187603},"labels":[],"label_agreement":null},{"id":"W2112215065","doi":"10.1139/l08-072","title":"Impacts of automation technology on quality of project deliverables in the Taiwanese construction industry","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Council","keywords":"Deliverable; Automation; Quality (philosophy); Process management; Computer science; Systems engineering; Procurement; Project management; Correctness; Risk analysis (engineering); Operations management; Engineering management; Engineering; Business","score_opus":0.010910806690220728,"score_gpt":0.22533980027148004,"score_spread":0.2144289935812593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112215065","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99858725,0.00008565064,0.00044544155,0.00008810374,0.0000014217478,0.000010343727,0.000017051354,0.0000076078372,0.0007571921],"genre_scores_gemma":[0.9995048,0.000051509196,0.00024745506,0.00000883253,0.0000020879932,0.000008008335,0.000021803502,0.0000028260895,0.00015266897],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9922111,0.003027005,0.0005651092,0.0003123752,0.0032659944,0.0006183631],"domain_scores_gemma":[0.95056236,0.023672514,0.013722837,0.0017197789,0.008891152,0.0014313837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005459342,0.00021037998,0.0001728024,0.0012810694,0.00042986116,0.0014323231,0.00031110397,0.00030067685,0.0010536686],"category_scores_gemma":[0.03218125,0.00017104557,0.0002907094,0.0012400274,0.00061281736,0.0007255819,0.0009453902,0.00043588417,0.00014071017],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002835158,0.00032286666,0.9131242,0.00018089634,0.000090242895,0.00077504665,0.0099759605,0.0027870575,0.0061448794,0.0004010941,0.0002470481,0.06566714],"study_design_scores_gemma":[0.000008134292,0.0004543395,0.9898679,0.000043701653,0.000023771372,0.00015124213,0.0052522994,0.001827454,0.001334569,0.0001295618,0.0008874352,0.000019553425],"about_ca_topic_score_codex":0.011331444,"about_ca_topic_score_gemma":0.012852902,"teacher_disagreement_score":0.011331444,"about_ca_system_score_codex":0.0017221826,"about_ca_system_score_gemma":0.0019036642,"threshold_uncertainty_score":0.028872073},"labels":[],"label_agreement":null},{"id":"W2112272364","doi":"10.1061/(asce)0887-3801(2005)19:2(172)","title":"Building Integrated Architecture/Engineering/Construction Systems Using Smart Objects: Methodology and Implementation","year":2005,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"BC Innovation Council; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Systems engineering; Building information modeling; Information model; Computer science; Integrated design; Engineering; System lifecycle; Architecture; Software engineering; Product lifecycle; New product development","score_opus":0.01613792735970042,"score_gpt":0.265734142334077,"score_spread":0.24959621497437656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112272364","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005222829,0.00010820646,0.99116945,0.00017140525,0.000013249624,0.00017758226,0.000017415621,0.00025718613,0.0028627706],"genre_scores_gemma":[0.032644268,0.00032823082,0.9652676,0.000024468472,0.000006383713,0.00041482807,0.00007382873,0.00005131936,0.0011889767],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998314,0.0005892814,0.00015883346,0.00019871836,0.00064030517,0.000098887045],"domain_scores_gemma":[0.9987576,0.00043200218,0.00010455873,0.00036081034,0.00026604868,0.000078987876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004088833,0.00069358497,0.000577116,0.0011948075,0.0008527608,0.004092005,0.0028919121,0.0015758204,0.0033693544],"category_scores_gemma":[0.003014091,0.0009531599,0.00093008165,0.0014345399,0.0027182861,0.0044309814,0.0022573383,0.0013970389,0.0009313355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032613643,0.00042374193,0.0020643815,0.0005520729,0.00007055129,0.00033729055,0.0024099336,0.11648419,0.0069261077,0.6053248,0.0016853354,0.263689],"study_design_scores_gemma":[0.0001347435,0.000415541,0.0010721978,0.0005246022,0.00008223472,0.0005209696,0.0011227207,0.6324512,0.015721073,0.23137945,0.11645257,0.00012270045],"about_ca_topic_score_codex":0.0030836451,"about_ca_topic_score_gemma":0.0028235859,"teacher_disagreement_score":0.004092005,"about_ca_system_score_codex":0.0013631774,"about_ca_system_score_gemma":0.0030793182,"threshold_uncertainty_score":0.021624088},"labels":[],"label_agreement":null},{"id":"W2112414195","doi":"10.1061/9780784412329.129","title":"Integrated Building Information Model to Identify Possible Crane Instability Caused by Strong Winds","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Process (computing); Plan (archaeology); Selection (genetic algorithm); Systems engineering; Building information modeling; Computer science; Engineering; Risk analysis (engineering); Stability (learning theory); Construction engineering; Operations research; Operations management; Scheduling (production processes)","score_opus":0.04403308173752693,"score_gpt":0.3415100007979205,"score_spread":0.29747691906039353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112414195","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061643504,0.00010585346,0.9214453,0.00027506068,0.000033404693,0.00015457343,0.0012338562,0.0016787109,0.013429591],"genre_scores_gemma":[0.7654012,0.00019600338,0.22683457,0.000050322764,0.0000099905155,0.0003696925,0.0019609735,0.000088981,0.0050883675],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994796,0.00013195921,0.000045240275,0.00008245206,0.00019723222,0.00006351394],"domain_scores_gemma":[0.99924123,0.00039184428,0.00009985704,0.00007885884,0.00015318765,0.000035113946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084100914,0.0007361959,0.0006754462,0.0012571944,0.0005475813,0.0016098246,0.0012365587,0.0011192199,0.0039390293],"category_scores_gemma":[0.0024530734,0.0005598128,0.0011248823,0.0012227987,0.00039011118,0.0016440011,0.001091292,0.00070723245,0.00044989982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040375624,0.00003306229,0.0013716943,0.00002269741,0.000022486054,0.00007751842,0.000059514165,0.982547,0.0004960763,0.007356694,0.00034193636,0.0076309126],"study_design_scores_gemma":[0.000004845518,0.000008655354,0.00016705213,0.0000038457747,0.000010789426,0.000011152171,0.000017805236,0.9974446,0.00022893696,0.0015513232,0.00054772926,0.0000032660587],"about_ca_topic_score_codex":0.022693142,"about_ca_topic_score_gemma":0.025409825,"teacher_disagreement_score":0.022693142,"about_ca_system_score_codex":0.0011210329,"about_ca_system_score_gemma":0.001777877,"threshold_uncertainty_score":0.045122147},"labels":[],"label_agreement":null},{"id":"W2112946342","doi":"10.1108/17538370910971063","title":"Building information modelling demystified: does it make business sense to adopt BIM?","year":2009,"lang":"en","type":"article","venue":"International Journal of Managing Projects in Business","topic":"BIM and Construction Integration","field":"Engineering","cited_by":260,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Originality; Business; Value (mathematics); Process (computing); Project management; Knowledge management; Marketing; Process management; Engineering; Management; Operations management; Computer science; Qualitative research; Sociology; Economics","score_opus":0.012686509838911607,"score_gpt":0.24049607770912104,"score_spread":0.22780956787020942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2112946342","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7041813,0.004758289,0.044496838,0.10622283,0.0003433406,0.00027373864,0.00011223631,0.00030539805,0.13930596],"genre_scores_gemma":[0.98306054,0.0013039665,0.012291548,0.0012930664,0.00003430915,0.000048835405,0.000047767415,0.00005954618,0.0018603739],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97715795,0.012526181,0.00087319,0.0010208986,0.006742964,0.0016789048],"domain_scores_gemma":[0.97116303,0.014423042,0.0033567902,0.004529707,0.0049544894,0.0015730198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025455004,0.00041820525,0.0004306507,0.0027124688,0.0028691522,0.01782004,0.0019470192,0.0025092342,0.0025510143],"category_scores_gemma":[0.0349645,0.00061660184,0.0005230391,0.0038926087,0.013834856,0.01840975,0.0100001125,0.00419468,0.0006164696],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001501838,0.0003167434,0.05356218,0.001331559,0.000096832606,0.0016839931,0.1976779,0.0019457272,0.004944429,0.3190211,0.0073424005,0.41192698],"study_design_scores_gemma":[0.000029893115,0.00029824648,0.043277342,0.0037126371,0.00011464931,0.0023488945,0.43281722,0.0077601513,0.0056890086,0.17759912,0.32618338,0.00016948846],"about_ca_topic_score_codex":0.0052887113,"about_ca_topic_score_gemma":0.0055674324,"teacher_disagreement_score":0.025455004,"about_ca_system_score_codex":0.007217653,"about_ca_system_score_gemma":0.009278496,"threshold_uncertainty_score":0.13462049},"labels":[],"label_agreement":null},{"id":"W2113721707","doi":"10.1109/isuma.1993.366724","title":"Construction simulation and distribution fitting in a data deficient environment","year":2002,"lang":"en","type":"article","venue":"1993 (2nd) International Symposium on Uncertainty Modeling and Analysis","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Duration (music); Computer science; Distribution (mathematics); Artificial intelligence; Machine learning; Data mining; Mathematics","score_opus":0.021756484635682718,"score_gpt":0.23276987737803764,"score_spread":0.21101339274235492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2113721707","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023797974,0.000007724799,0.97331786,0.0000620461,0.000009375952,0.000025703135,0.00016052362,0.00080380536,0.0018149595],"genre_scores_gemma":[0.52263224,0.000055624667,0.4728413,0.000036272377,0.000011415416,0.00030570428,0.0007438521,0.0005158592,0.0028577896],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988657,0.00048805142,0.000076569166,0.00012990642,0.00037891316,0.000060865357],"domain_scores_gemma":[0.99491537,0.003565663,0.0001717047,0.0006037514,0.0006673063,0.000076276105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022120334,0.0005667177,0.000692514,0.0007154867,0.0004846162,0.0011968988,0.0010491967,0.0009588178,0.0043406547],"category_scores_gemma":[0.009167176,0.00057792733,0.00072757073,0.00091563206,0.0005462455,0.0013862646,0.001305105,0.00088524295,0.0006427039],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004790617,0.000027840213,0.0007826757,0.000025962707,0.000009572922,0.000077374425,0.00013753367,0.9779759,0.0012462194,0.010053191,0.00033417926,0.009281577],"study_design_scores_gemma":[0.0000038421595,0.0000065800814,0.0000637225,0.0000022116988,0.0000013990508,0.000011606312,0.000013650144,0.9959293,0.0010299007,0.002337837,0.0005956847,0.0000042311904],"about_ca_topic_score_codex":0.0044354703,"about_ca_topic_score_gemma":0.0026659642,"teacher_disagreement_score":0.0044354703,"about_ca_system_score_codex":0.00078489777,"about_ca_system_score_gemma":0.000812492,"threshold_uncertainty_score":0.014520943},"labels":[],"label_agreement":null},{"id":"W2115163594","doi":"10.1186/2213-7459-1-9","title":"Review and analysis of augmented reality literature for construction industry","year":2013,"lang":"en","type":"article","venue":"Visualization in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":178,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Augmented reality; Maturity (psychological); Schedule; Virtual reality; Field (mathematics); Building information modeling; Engineering management; Engineering; Computer science; Operations management; Human–computer interaction; Political science","score_opus":0.009240237484538819,"score_gpt":0.2582947414295159,"score_spread":0.2490545039449771,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115163594","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006253957,0.99712855,0.00027194837,0.00049773563,0.00024417244,0.000022271104,0.000085620755,0.000006086543,0.0011182819],"genre_scores_gemma":[0.0050785476,0.9937703,0.0004557615,0.0002755202,0.00015004507,0.000033310884,0.000086671884,0.0000036583363,0.00014614037],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99619377,0.0010643062,0.0010236114,0.00030332175,0.0012899542,0.00012517991],"domain_scores_gemma":[0.96927565,0.02279972,0.0026326263,0.00042087748,0.004618309,0.00025281575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043334826,0.0008845958,0.0017873188,0.025869036,0.0006196337,0.0027487853,0.0012601502,0.001422928,0.0048762853],"category_scores_gemma":[0.018395869,0.0006050976,0.0019792195,0.026396744,0.000899812,0.002519645,0.0011847703,0.0010041556,0.0007185257],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010971658,0.00005548755,0.0014115612,0.33434802,0.0007570703,0.0006180908,0.0015647439,0.00051701296,0.00085598533,0.004211086,0.022715533,0.63283575],"study_design_scores_gemma":[0.000022208967,0.00018130885,0.012427118,0.44032916,0.003049691,0.002098244,0.0028051753,0.00032928935,0.0007380875,0.0020716363,0.5358647,0.00008343877],"about_ca_topic_score_codex":0.0036820618,"about_ca_topic_score_gemma":0.0069694794,"teacher_disagreement_score":0.025869036,"about_ca_system_score_codex":0.0022498276,"about_ca_system_score_gemma":0.0074665635,"threshold_uncertainty_score":0.022917926},"labels":[],"label_agreement":null},{"id":"W2115467569","doi":"10.5555/2433508.2433888","title":"An HLA-based bidding game with intelligent virtual player","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; High-level architecture; Architecture; Process (computing); Game theory; Virtual machine; Fuzzy logic; Software engineering; Operating system; Artificial intelligence","score_opus":0.005722538136415866,"score_gpt":0.20178767298202124,"score_spread":0.19606513484560537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2115467569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16415635,0.000052386677,0.79696023,0.00045348116,0.00010914636,0.00072240864,0.00013882194,0.005823583,0.031583596],"genre_scores_gemma":[0.61611414,0.00006447343,0.3625121,0.00017411647,0.000016159547,0.00064580725,0.00028813607,0.0002218991,0.019963067],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99944776,0.00023015492,0.000038461425,0.000060435883,0.00014693114,0.00007626555],"domain_scores_gemma":[0.99941266,0.00021590233,0.000031997657,0.000075330754,0.00009437752,0.00016974998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009167787,0.00036896404,0.0003128466,0.0002456286,0.00047488348,0.000991736,0.0010796589,0.00072620966,0.006323862],"category_scores_gemma":[0.0017270434,0.00028646024,0.00024763722,0.00018248906,0.00052570936,0.0013224632,0.0015825605,0.00075370463,0.0009708035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002143705,0.0046577333,0.010706368,0.00040885067,0.000118993106,0.0021033569,0.004578795,0.31177476,0.12198657,0.19289955,0.021033796,0.32758754],"study_design_scores_gemma":[0.0002800679,0.0007400979,0.0016518942,0.000027685295,0.000037569967,0.0005080027,0.00027716748,0.88949203,0.027558835,0.014632392,0.06473816,0.00005622488],"about_ca_topic_score_codex":0.0015777174,"about_ca_topic_score_gemma":0.0016113996,"teacher_disagreement_score":0.006323862,"about_ca_system_score_codex":0.0004048395,"about_ca_system_score_gemma":0.0008659698,"threshold_uncertainty_score":0.021155477},"labels":[],"label_agreement":null},{"id":"W2116340790","doi":"10.1061/41109(373)3","title":"Resource Performance Indicators in Controlling Industrial Steel Projects","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Resource (disambiguation); Systems engineering; Performance indicator; Computer science; Control (management); Process (computing); Markov chain; Engineering; Industrial engineering; Business","score_opus":0.011304692620435033,"score_gpt":0.19197177816869937,"score_spread":0.18066708554826433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2116340790","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4660375,0.0003141492,0.52449965,0.00014977297,0.00004106692,0.000111798094,0.00016417698,0.0010784589,0.0076034046],"genre_scores_gemma":[0.9845464,0.000075940006,0.014904128,0.0000063234615,0.0000059911717,0.000034292912,0.00006545557,0.0000136068675,0.00034786208],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.998223,0.0006290944,0.00010755918,0.00022247685,0.0006857817,0.00013211824],"domain_scores_gemma":[0.9964825,0.0016749483,0.00089007133,0.000121579855,0.0006974999,0.00013328546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028659552,0.0006514002,0.0005039844,0.0014483511,0.0002796377,0.001163392,0.00044496468,0.0004464824,0.00044909897],"category_scores_gemma":[0.0073359828,0.00027818422,0.00022372653,0.0017750433,0.00046625326,0.0010428146,0.0006669241,0.00045607937,0.00014030769],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005468045,0.00019059386,0.028730275,0.00011045296,0.000044206823,0.00007426097,0.0002499977,0.8735167,0.008618553,0.0053862003,0.0005191423,0.08201284],"study_design_scores_gemma":[0.000014474528,0.00018034426,0.009068149,0.000018315499,0.000018412347,0.000022410657,0.00008115639,0.9789331,0.0097531965,0.0012389667,0.00063309993,0.000038377406],"about_ca_topic_score_codex":0.0052669095,"about_ca_topic_score_gemma":0.00338745,"teacher_disagreement_score":0.0052669095,"about_ca_system_score_codex":0.0010299825,"about_ca_system_score_gemma":0.0007305148,"threshold_uncertainty_score":0.0151568055},"labels":[],"label_agreement":null},{"id":"W2118371895","doi":"10.1061/9780784479070.039","title":"Overview of Building Information Modeling Applications in Construction Projects","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Building information modeling; Construction engineering; Systems engineering; Data science; Engineering","score_opus":0.0406964215009775,"score_gpt":0.2561759752365242,"score_spread":0.2154795537355467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2118371895","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02763689,0.47350526,0.23601277,0.0033855159,0.00058998313,0.00061153556,0.0028836469,0.0030113182,0.25236315],"genre_scores_gemma":[0.11371891,0.5663518,0.28551653,0.0008806397,0.0005509048,0.0005177256,0.0054255445,0.00049307727,0.026544914],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99759513,0.0006711414,0.00034729642,0.00021750072,0.0010244069,0.00014450392],"domain_scores_gemma":[0.99685055,0.0017144588,0.0002741646,0.00022300181,0.0008493883,0.00008839811],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002237009,0.000902779,0.0005594618,0.010283738,0.00081010937,0.0026533776,0.0010849176,0.0012490543,0.00587029],"category_scores_gemma":[0.0030864843,0.00075877085,0.0008806369,0.018961119,0.00039424287,0.0033291627,0.0013414499,0.000808923,0.0028226275],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004809287,0.00008730147,0.0029640351,0.0065228054,0.000037698665,0.0003500266,0.0011065311,0.0042045712,0.002332159,0.021994388,0.01740767,0.94294465],"study_design_scores_gemma":[0.0000059582208,0.00006104594,0.006566935,0.005088535,0.000082678685,0.0011691671,0.0009195443,0.0053252326,0.00328764,0.010992105,0.9664295,0.0000716859],"about_ca_topic_score_codex":0.003415305,"about_ca_topic_score_gemma":0.0040399362,"teacher_disagreement_score":0.010283738,"about_ca_system_score_codex":0.0010355889,"about_ca_system_score_gemma":0.0014737331,"threshold_uncertainty_score":0.019638062},"labels":[],"label_agreement":null},{"id":"W2120078372","doi":"","title":"A Review of Quantitative Approaches to Intelligent Building Assessment","year":2006,"lang":"en","type":"review","venue":"OakTrust (Texas A&M University Libraries)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Christian ministry; Architecture; Strengths and weaknesses; China; Engineering; Process (computing); Architectural engineering; Engineering management; Construction engineering; Computer science; Geography; Political science","score_opus":0.10458108242602554,"score_gpt":0.2744937573972693,"score_spread":0.16991267497124374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2120078372","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010959917,0.88186234,0.06822355,0.0021248166,0.0009210136,0.00020979278,0.00033417664,0.00012007996,0.04510828],"genre_scores_gemma":[0.017906057,0.92298996,0.051571846,0.0007898173,0.0006819958,0.00049256225,0.0003143651,0.00006050552,0.0051928926],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99266124,0.002904747,0.0006699155,0.00046472295,0.0031902483,0.000109047854],"domain_scores_gemma":[0.9872569,0.0091385115,0.0005278683,0.0004284809,0.0025777877,0.00007051085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071660383,0.0016184895,0.002021683,0.014473554,0.0008614607,0.0036441353,0.0023250133,0.0014410568,0.007992183],"category_scores_gemma":[0.017733982,0.0008100611,0.0010038696,0.017587278,0.0021735497,0.004627934,0.0014916273,0.0014386737,0.0023567001],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032560194,0.00007240438,0.0005965574,0.018011555,0.00009606212,0.00008878762,0.00044311924,0.0022761854,0.000405235,0.058391187,0.016244708,0.9033416],"study_design_scores_gemma":[0.000019378003,0.00015022125,0.003781157,0.017634526,0.00018293656,0.00083349244,0.0012165336,0.0028200168,0.0011548628,0.06789045,0.90420204,0.00011442355],"about_ca_topic_score_codex":0.0042566117,"about_ca_topic_score_gemma":0.005721926,"teacher_disagreement_score":0.014473554,"about_ca_system_score_codex":0.0030458956,"about_ca_system_score_gemma":0.0034728718,"threshold_uncertainty_score":0.037898123},"labels":[],"label_agreement":null},{"id":"W2122351176","doi":"10.1061/(asce)0733-9364(2005)131:2(168)","title":"Graphical Approach for Manpower Planning in Infrastructure Networks","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Computer science; Scheduling (production processes); Operations research; Engineering; Operations management","score_opus":0.0034224390620060416,"score_gpt":0.18411934413907768,"score_spread":0.18069690507707165,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2122351176","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00081119826,0.000120900506,0.99540305,0.00011868743,0.000025140665,0.00003213008,0.000104256455,0.00019767179,0.0031868706],"genre_scores_gemma":[0.14334735,0.0012864029,0.84464884,0.00025470424,0.00015211332,0.00053543557,0.000578099,0.000259877,0.008937236],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9985446,0.00088992587,0.000052973046,0.00019842335,0.00022638345,0.00008774621],"domain_scores_gemma":[0.9981844,0.0013274814,0.00011600482,0.000115927294,0.00018491822,0.000071265604],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013620205,0.0012921516,0.0008696305,0.0020036995,0.0006983116,0.0024058644,0.0016066832,0.0012230129,0.011254108],"category_scores_gemma":[0.004215552,0.0009065412,0.0017373303,0.0022123693,0.0013796877,0.0018619037,0.0013151158,0.0015925765,0.0017200403],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052639632,0.000030324114,0.00039377486,0.00015650142,0.00004241314,0.00021794128,0.00012774029,0.67944676,0.0011548022,0.2703146,0.0038944175,0.04416813],"study_design_scores_gemma":[0.000019455441,0.000025899664,0.000135566,0.000028686203,0.000019999134,0.00007097235,0.0000401961,0.8428604,0.000505686,0.14547342,0.010793741,0.000025954183],"about_ca_topic_score_codex":0.008085737,"about_ca_topic_score_gemma":0.012812894,"teacher_disagreement_score":0.011254108,"about_ca_system_score_codex":0.0019194202,"about_ca_system_score_gemma":0.001302305,"threshold_uncertainty_score":0.037648737},"labels":[],"label_agreement":null},{"id":"W2123303660","doi":"10.1061/9780784412329.249","title":"Improving Concrete Trade Labor Productivity through the Use of Innovations","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Formwork; Productivity; Schedule; Modular design; Engineering; Construction industry; Unit (ring theory); Civil engineering; Computer science; Construction engineering; Economics; Mathematics","score_opus":0.08499638239499882,"score_gpt":0.3161857194941928,"score_spread":0.23118933709919395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123303660","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9882697,0.00016166085,0.003898701,0.00007529882,0.0000035166508,0.000087288034,0.00004496083,0.000019356714,0.0074394913],"genre_scores_gemma":[0.9891016,0.00025778063,0.009339683,0.000012884913,0.0000040149707,0.00004130981,0.00003940201,0.0000067568894,0.0011966542],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99711525,0.0008811497,0.000151271,0.00026827175,0.0012323859,0.00035158114],"domain_scores_gemma":[0.9928464,0.0031476866,0.002048937,0.0006605546,0.0010703405,0.00022606461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024654896,0.0003625612,0.00030566406,0.0014871979,0.00045314856,0.0012858204,0.0007145236,0.0003194246,0.0014361906],"category_scores_gemma":[0.00696808,0.0001861063,0.0003182953,0.0015627675,0.0007827243,0.0010219398,0.0011836027,0.0003446399,0.00014207592],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007841299,0.0018361018,0.3038072,0.0008367499,0.000171927,0.0005336588,0.004973908,0.023040982,0.047934517,0.008578429,0.0007730945,0.6067293],"study_design_scores_gemma":[0.00008470764,0.0076705515,0.8808253,0.00029857297,0.00027212637,0.00045875303,0.0089217955,0.010498594,0.06234986,0.00464412,0.023894023,0.00008167849],"about_ca_topic_score_codex":0.002792278,"about_ca_topic_score_gemma":0.011627628,"teacher_disagreement_score":0.002792278,"about_ca_system_score_codex":0.0024489963,"about_ca_system_score_gemma":0.0025962612,"threshold_uncertainty_score":0.01776874},"labels":[],"label_agreement":null},{"id":"W2123593214","doi":"10.5555/1351542.1351906","title":"Agent-based simulation for collaborative cranes","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Kinematics; Computer science; Motion planning; Control (management); Action (physics); Control engineering; Simulation; Systems engineering; Distributed computing; Engineering; Artificial intelligence; Robot","score_opus":0.03286624200636735,"score_gpt":0.2850389930759678,"score_spread":0.25217275106960046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2123593214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036455322,0.00038040619,0.93804204,0.0005326275,0.00013094545,0.00024986936,0.0002809528,0.0015359301,0.02239195],"genre_scores_gemma":[0.7031324,0.0007170088,0.2835498,0.000104770894,0.000046340017,0.00092469645,0.00040264666,0.00022650529,0.010895842],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994393,0.00027248397,0.000032495034,0.00006457185,0.00014640998,0.00004466598],"domain_scores_gemma":[0.9989845,0.00061669934,0.00006848778,0.00009856355,0.00013514337,0.000096549724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000740367,0.0009151506,0.0011197547,0.0005787108,0.0011595096,0.0017282811,0.0017173134,0.0018849083,0.0064222547],"category_scores_gemma":[0.0019406963,0.0007163938,0.00096789293,0.0004983722,0.0012209876,0.0012508461,0.0018042385,0.0014656843,0.00063863763],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024659186,0.000018048946,0.0001717002,0.000021679607,0.000017094868,0.000048301714,0.00004780258,0.9818225,0.00028923017,0.014984201,0.00024873114,0.0023060432],"study_design_scores_gemma":[0.0000186075,0.0000066193247,0.00002267717,0.000004728936,0.0000034211293,0.00000608579,0.000009376474,0.99457884,0.00012281301,0.0036874628,0.0015356715,0.0000038417757],"about_ca_topic_score_codex":0.023016235,"about_ca_topic_score_gemma":0.01612424,"teacher_disagreement_score":0.023016235,"about_ca_system_score_codex":0.0015037662,"about_ca_system_score_gemma":0.0018675544,"threshold_uncertainty_score":0.045764565},"labels":[],"label_agreement":null},{"id":"W2124910353","doi":"10.5555/564124.564352","title":"On the use of fuzzy clustering in construction simulation","year":2001,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cluster analysis; Computer science; Fuzzy clustering; Fuzzy logic; Discrete event simulation; Data mining; Fuzzy set; Simulation; Artificial intelligence","score_opus":0.062464998529263016,"score_gpt":0.2579908976892235,"score_spread":0.1955258991599605,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124910353","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016378792,0.00015127959,0.9792138,0.00010729939,0.000017436494,0.000047431175,0.000022409835,0.00015909644,0.0039025885],"genre_scores_gemma":[0.5860846,0.0003979313,0.41199604,0.000060116065,0.00002468255,0.00014489195,0.00006809918,0.00007452326,0.0011491855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984445,0.00090913504,0.00006664858,0.00014804312,0.00036250532,0.0000690989],"domain_scores_gemma":[0.99557614,0.0031637845,0.00020810978,0.00033589412,0.00062545366,0.00009053211],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032946279,0.0007139736,0.00092772214,0.0013716036,0.0010331706,0.0013376724,0.0011634501,0.001040774,0.0014994964],"category_scores_gemma":[0.010120346,0.0005503548,0.00089306047,0.0015038485,0.0012415283,0.0012698766,0.0009921154,0.00076412776,0.00025601228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028237137,0.000018100036,0.00045609195,0.000025247526,0.00003142327,0.000028533392,0.00007487432,0.9497745,0.0004964402,0.029418765,0.00012141,0.019526292],"study_design_scores_gemma":[0.0000051660054,0.000015135707,0.00011556625,0.000010075826,0.0000058641153,0.000013604149,0.000015197874,0.9869666,0.0003997605,0.0118739465,0.00056933245,0.0000096696385],"about_ca_topic_score_codex":0.018651623,"about_ca_topic_score_gemma":0.011312516,"teacher_disagreement_score":0.018651623,"about_ca_system_score_codex":0.0016557012,"about_ca_system_score_gemma":0.001330586,"threshold_uncertainty_score":0.03708613},"labels":[],"label_agreement":null},{"id":"W2124960278","doi":"10.1109/ifsa-nafips.2013.6608554","title":"Developing a fuzzy discrete event simulation framework within a traditional simulation engine","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Fuzzy logic; Computer science; Event (particle physics); Variable (mathematics); Fuzzy set; Simulation modeling; Artificial intelligence; Simulation; Mathematics","score_opus":0.023000583797560092,"score_gpt":0.24691504052437674,"score_spread":0.22391445672681665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2124960278","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017253604,0.00003016988,0.99628687,0.000035202236,0.00001117144,0.000045530836,0.000019035982,0.00017149956,0.0016751857],"genre_scores_gemma":[0.12992162,0.00024023702,0.86686826,0.000038282004,0.000025423366,0.00019844358,0.00013419634,0.000059818944,0.0025136834],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992719,0.00019244391,0.000067198765,0.0001113851,0.00030777475,0.00004929132],"domain_scores_gemma":[0.999426,0.00025006873,0.00004240189,0.00006168009,0.0001834224,0.000036437516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016673052,0.00062409573,0.00057717727,0.00081677147,0.00048684768,0.0011750337,0.0015004177,0.0008348019,0.0024025252],"category_scores_gemma":[0.0016670823,0.00033164676,0.0011096821,0.00043772085,0.00070950435,0.0012718467,0.0009733008,0.0010706797,0.00056170224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004359497,0.00007157082,0.0006265932,0.00012483708,0.00005252603,0.00017091105,0.00017134564,0.76121396,0.0057400945,0.1909657,0.0005512929,0.040267617],"study_design_scores_gemma":[0.0000099169365,0.000021532556,0.000054267955,0.000018685592,0.000011017501,0.000030220946,0.000017401248,0.9817892,0.0017773715,0.010497264,0.005762939,0.000010203184],"about_ca_topic_score_codex":0.007808774,"about_ca_topic_score_gemma":0.005708391,"teacher_disagreement_score":0.007808774,"about_ca_system_score_codex":0.00083967514,"about_ca_system_score_gemma":0.0018387889,"threshold_uncertainty_score":0.015526652},"labels":[],"label_agreement":null},{"id":"W2125053417","doi":"10.1061/9780784412329.128","title":"Integrated BIM/Lean Base Production Line Schedule Model for Modular Construction Manufacturing","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Modular design; Schedule; Factory (object-oriented programming); Value stream mapping; Manufacturing engineering; Process (computing); Lean manufacturing; Building information modeling; Engineering; Systems engineering; Production line; Computer science; Industrial engineering; Scheduling (production processes); Operations management; Mechanical engineering","score_opus":0.06540056605725332,"score_gpt":0.3119252680356477,"score_spread":0.24652470197839438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2125053417","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034972865,0.000108407636,0.94175255,0.00015509393,0.000038365273,0.00017486291,0.00069639715,0.0006300425,0.021471383],"genre_scores_gemma":[0.6571876,0.00034819698,0.32694247,0.000050375336,0.00001833976,0.0007576278,0.0013065353,0.00014326407,0.01324559],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997162,0.00007625352,0.000013464708,0.000037805876,0.000119407654,0.000036782127],"domain_scores_gemma":[0.99981254,0.00006646233,0.000028423729,0.000015367312,0.00006337599,0.000013830839],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057067187,0.00057430676,0.0004912714,0.00080260343,0.00047892318,0.0010674213,0.0012953226,0.00067391136,0.0053567016],"category_scores_gemma":[0.0006962151,0.00047391845,0.00084351236,0.0009279776,0.0003265279,0.0005991431,0.0005636415,0.00053113466,0.00071026006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001432146,0.000014626172,0.0001331071,0.000013105389,0.0000036562951,0.000030550586,0.000016602004,0.9899496,0.0002965652,0.005157543,0.0002170419,0.004153332],"study_design_scores_gemma":[0.0000053932627,0.000010566457,0.000062072846,0.000003239813,0.0000037814625,0.000008008953,0.00000840859,0.9973463,0.0002015963,0.0013603126,0.0009874565,0.0000028680001],"about_ca_topic_score_codex":0.016168408,"about_ca_topic_score_gemma":0.016652595,"teacher_disagreement_score":0.016168408,"about_ca_system_score_codex":0.0013731531,"about_ca_system_score_gemma":0.0021224096,"threshold_uncertainty_score":0.0321486},"labels":[],"label_agreement":null},{"id":"W2127202902","doi":"10.1061/9780784412329.079","title":"Rethinking the Cost Estimating Process through 5D BIM: A Case Study","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":78,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Building information modeling; Workflow; Predictability; Computer science; Process (computing); Software; Cost estimate; Systems engineering; Work (physics); Process management; Software engineering; Risk analysis (engineering); Engineering; Operations management; Scheduling (production processes); Business; Database","score_opus":0.11367742315030975,"score_gpt":0.38238080314851874,"score_spread":0.268703379998209,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127202902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9610941,0.00014904492,0.030072296,0.00069039105,0.000025760943,0.00042591034,0.00011484022,0.0001224672,0.007305226],"genre_scores_gemma":[0.9265432,0.00023588637,0.070898086,0.00009486781,0.000011332754,0.00021816714,0.00009037118,0.0000782972,0.0018297231],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99144495,0.005519837,0.00038788488,0.0004491194,0.0016197676,0.0005783898],"domain_scores_gemma":[0.981979,0.011993766,0.0010915454,0.00265356,0.0017392724,0.0005427698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010651486,0.0006315822,0.00052227214,0.0021956842,0.003144012,0.0030710076,0.0024048483,0.0025214422,0.0018820874],"category_scores_gemma":[0.016650628,0.00068512955,0.00068491604,0.0029412585,0.0021702638,0.0031835802,0.0026104965,0.0017013897,0.000487597],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013931923,0.008422716,0.10373,0.001306721,0.0001772293,0.03061674,0.13555206,0.09630709,0.031815857,0.041296076,0.005536008,0.54384625],"study_design_scores_gemma":[0.0005640998,0.0066754143,0.13133465,0.0013082902,0.0005737322,0.016450943,0.20675595,0.36306015,0.07960417,0.020141998,0.17264357,0.0008870588],"about_ca_topic_score_codex":0.008817136,"about_ca_topic_score_gemma":0.018415645,"teacher_disagreement_score":0.010651486,"about_ca_system_score_codex":0.0037547392,"about_ca_system_score_gemma":0.0026337951,"threshold_uncertainty_score":0.056331098},"labels":[],"label_agreement":null},{"id":"W2127396715","doi":"10.1061/(asce)0733-9364(2003)129:4(396)","title":"Genetic Optimization for Dynamic Project Control","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":69,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"USable; Schedule; Computer science; Earned value management; Cash flow; Scheduling (production processes); Resource leveling; Genetic algorithm; Project management; Operations research; Project planning; Industrial engineering; Mathematical optimization; Systems engineering; Engineering; Operations management","score_opus":0.002866054542077819,"score_gpt":0.17880501614989378,"score_spread":0.17593896160781597,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2127396715","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041598827,0.00036627185,0.9863511,0.00027029455,0.000044751705,0.00003368408,0.000070312315,0.00011806234,0.008585758],"genre_scores_gemma":[0.71335495,0.001932575,0.25796363,0.00028537674,0.00013078527,0.0007525154,0.00034684586,0.00014454867,0.025088757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946874,0.00019122192,0.000018128138,0.000098942335,0.00015868586,0.00006426571],"domain_scores_gemma":[0.99958044,0.0002474523,0.000053779717,0.000024055675,0.00007273981,0.0000216777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010139737,0.0009815983,0.00093884976,0.0006709593,0.00041912796,0.0011614298,0.0010251718,0.001194841,0.0037715235],"category_scores_gemma":[0.0019601143,0.0003669929,0.0006912127,0.0008963788,0.0013021041,0.00088967255,0.00065350626,0.0012549541,0.00054434943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061803735,0.000008302552,0.000049272054,0.000010581579,0.000008419122,0.000014576546,0.0000115311295,0.9512468,0.00010034891,0.043133,0.00034088167,0.0050701033],"study_design_scores_gemma":[0.0000070870724,0.000008199436,0.000030436808,0.000004108452,0.0000031159532,0.0000057764996,0.000003571303,0.9717782,0.00004861576,0.026666438,0.0014407637,0.0000038197963],"about_ca_topic_score_codex":0.010701943,"about_ca_topic_score_gemma":0.0063903523,"teacher_disagreement_score":0.010701943,"about_ca_system_score_codex":0.0022612507,"about_ca_system_score_gemma":0.0015487146,"threshold_uncertainty_score":0.021279335},"labels":[],"label_agreement":null},{"id":"W2129112673","doi":"10.5555/1351542.1351865","title":"A simulation-based framework for quantifying the cold regions weather impacts on construction schedules","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Baseline (sea); Schedule; Cold weather; Computer science; Scheduling (production processes); Operations research; Meteorology; Engineering; Operations management; Geography","score_opus":0.058261378241718266,"score_gpt":0.3153611289114695,"score_spread":0.2570997506697512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129112673","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041895114,0.000101541715,0.9499201,0.0001484567,0.0000344942,0.00013996995,0.00031250753,0.00041169245,0.0070361122],"genre_scores_gemma":[0.7880015,0.00032098874,0.20799707,0.000038767197,0.00003731919,0.00051201973,0.0005641765,0.00012457087,0.0024036912],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99941623,0.000267402,0.000033985067,0.000075775315,0.00013281491,0.00007384808],"domain_scores_gemma":[0.99877757,0.0006541281,0.00016541031,0.000113788854,0.0001955763,0.0000934972],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013288605,0.00088829745,0.00063736737,0.0010913024,0.0005745485,0.0013543707,0.0015004856,0.0010888018,0.003035208],"category_scores_gemma":[0.0037957605,0.0007092576,0.0009188867,0.0010477528,0.00072063645,0.0010934726,0.000926091,0.0008472274,0.00027909543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004577526,0.0000068062636,0.00012867819,0.0000032449893,0.00000494523,0.0000052038727,0.000008945402,0.9968957,0.00011071404,0.0020952947,0.000030995805,0.00070496486],"study_design_scores_gemma":[0.0000031014856,0.000006929969,0.000078415374,0.0000023519642,0.000003431346,0.0000026346554,0.000006146473,0.9983675,0.00006440174,0.0012329749,0.00022913392,0.0000029925736],"about_ca_topic_score_codex":0.033317905,"about_ca_topic_score_gemma":0.021033928,"teacher_disagreement_score":0.033317905,"about_ca_system_score_codex":0.0018163854,"about_ca_system_score_gemma":0.0028857149,"threshold_uncertainty_score":0.06624794},"labels":[],"label_agreement":null},{"id":"W2129994225","doi":"10.5555/2675983.2676380","title":"Assessment of construction operations productivity rate as computed by simulation models","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Discrete event simulation; Credibility; Productivity; Duration (music); Simulation modeling; Process (computing); Computer science; Industrial engineering; Simulation; Operations research; Engineering; Mathematics","score_opus":0.02129100070408434,"score_gpt":0.2661875941416046,"score_spread":0.24489659343752024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2129994225","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8521918,0.00010868962,0.13604738,0.00016731184,0.000026573678,0.00016598415,0.0003796847,0.000560141,0.0103523815],"genre_scores_gemma":[0.98675007,0.00006213106,0.012509999,0.000006910328,0.0000033887695,0.00006431512,0.00014900685,0.000022141261,0.00043201353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99617034,0.0018307832,0.00023068028,0.00020516131,0.0013246344,0.00023826562],"domain_scores_gemma":[0.98166615,0.012094382,0.0012948769,0.00201505,0.0027050579,0.00022456996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007427796,0.0006831979,0.00061356777,0.0013556128,0.00031377946,0.0016253616,0.00077472813,0.0006346684,0.0012100835],"category_scores_gemma":[0.02496169,0.00031350943,0.000602589,0.0012175743,0.00038374003,0.0014396248,0.0007217598,0.0007354775,0.00017238571],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026051555,0.00008630234,0.012179608,0.00005424686,0.000046124846,0.000049687133,0.00018166202,0.9679703,0.0026161778,0.0038878429,0.00016588191,0.012501629],"study_design_scores_gemma":[0.000018278515,0.00026838674,0.0047140596,0.000022669494,0.000023503004,0.000029398738,0.00014716062,0.98949474,0.0034036576,0.0011888903,0.0006682335,0.000020922555],"about_ca_topic_score_codex":0.005373144,"about_ca_topic_score_gemma":0.0024495882,"teacher_disagreement_score":0.007427796,"about_ca_system_score_codex":0.001477148,"about_ca_system_score_gemma":0.001187871,"threshold_uncertainty_score":0.03928244},"labels":[],"label_agreement":null},{"id":"W2130363290","doi":"10.1109/citcon.1988.13243","title":"Computerized production planning and energy management","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"St. Lawrence College","funders":"","keywords":"Production (economics); Energy management; Initialization; Computer science; Function (biology); Cost reduction; Production planning; Energy (signal processing); Control (management); Operations research; Operations management; Engineering management; Manufacturing engineering; Systems engineering; Engineering; Business; Artificial intelligence; Economics; Mathematics","score_opus":0.006544199207077037,"score_gpt":0.17861581411276,"score_spread":0.17207161490568296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130363290","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005107946,0.0016893237,0.873813,0.0017293304,0.0002557751,0.0003089453,0.0011788388,0.008258935,0.10765786],"genre_scores_gemma":[0.2379938,0.005190869,0.68492466,0.0004998698,0.00033798735,0.0010899081,0.0053223427,0.00080608105,0.06383449],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9984951,0.00041366377,0.00010213336,0.00032133138,0.0005827934,0.000084972606],"domain_scores_gemma":[0.9983297,0.0007486721,0.000117704,0.000422734,0.00031849867,0.00006275913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016853414,0.0010850262,0.00075787265,0.0023554976,0.00084501994,0.0050095734,0.0017217065,0.0009877251,0.036341164],"category_scores_gemma":[0.004140054,0.0005750087,0.0005671124,0.0032511142,0.0010665674,0.0028614972,0.0013336209,0.00079843425,0.009816262],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000112179005,0.00014191767,0.0012249227,0.00021790122,0.00003668726,0.00012733872,0.00019936962,0.14848635,0.0022601138,0.11823253,0.045715123,0.6832456],"study_design_scores_gemma":[0.00013660516,0.00012223389,0.0017111338,0.00019789554,0.000054360476,0.00021740251,0.00026292691,0.3767932,0.00728528,0.22182646,0.3913095,0.00008310069],"about_ca_topic_score_codex":0.008265064,"about_ca_topic_score_gemma":0.010170277,"teacher_disagreement_score":0.036341164,"about_ca_system_score_codex":0.0023161143,"about_ca_system_score_gemma":0.0031509495,"threshold_uncertainty_score":0.12157327},"labels":[],"label_agreement":null},{"id":"W2130488785","doi":"10.1061/41020(339)75","title":"A Prediction Model for Construction Project Time Contingency","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Contingency","score_opus":0.04671138233417803,"score_gpt":0.3137268235767139,"score_spread":0.26701544124253584,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2130488785","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5373567,0.0003030353,0.4518139,0.0005885433,0.00008421505,0.00023661612,0.0019216026,0.0008277279,0.006867644],"genre_scores_gemma":[0.97928226,0.00013136762,0.017736264,0.000015852815,0.000013409187,0.00015334167,0.00063093874,0.00001924371,0.0020173178],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993086,0.00018796399,0.0000428907,0.00019137497,0.00016703934,0.00010219386],"domain_scores_gemma":[0.9983021,0.0009849853,0.00023639463,0.00005074548,0.00036184938,0.00006394935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013950717,0.00061581185,0.0005254972,0.0011620346,0.0003686912,0.0009809667,0.00095778017,0.00061801,0.0032553042],"category_scores_gemma":[0.0036426662,0.00037044854,0.00055618666,0.0013346195,0.00032413594,0.00080973044,0.0004230828,0.0008421599,0.00037771155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009068144,0.0000784252,0.012593535,0.000043006756,0.000030894025,0.00008643407,0.000102440186,0.9669825,0.0005709286,0.0032442422,0.0006863699,0.015490584],"study_design_scores_gemma":[0.0000032756157,0.000018278997,0.0014129044,0.000003295396,0.000006037519,0.000009419906,0.000018404098,0.997687,0.00006871107,0.00065331074,0.000114315124,0.000005087176],"about_ca_topic_score_codex":0.03892327,"about_ca_topic_score_gemma":0.027023798,"teacher_disagreement_score":0.03892327,"about_ca_system_score_codex":0.0015990213,"about_ca_system_score_gemma":0.0015920548,"threshold_uncertainty_score":0.07739341},"labels":[],"label_agreement":null},{"id":"W2131093447","doi":"10.1061/41138(386)145","title":"Integrated Decision-Support Framework for Municipal Infrastructure Asset","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University; Aecom (Canada)","funders":"","keywords":"Algorism; Decision support system; Asset (computer security); Asset management; Computer science; Process (computing); Business; Data mining; Computer security","score_opus":0.007582721223570563,"score_gpt":0.24727842744984818,"score_spread":0.23969570622627762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131093447","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011798055,0.00015979543,0.97146827,0.0008462607,0.00003645153,0.00040890294,0.00068951485,0.0009948107,0.01359795],"genre_scores_gemma":[0.26353446,0.00027170204,0.7303103,0.00010735223,0.000022245265,0.0008952134,0.0010848655,0.000065425076,0.0037084515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99847835,0.00062029716,0.00013440248,0.0001556974,0.00044388298,0.00016745139],"domain_scores_gemma":[0.99886024,0.00057030114,0.00008809312,0.00006961884,0.000321136,0.000090610556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003077325,0.00095790887,0.00075456203,0.0015935769,0.001153453,0.0037705007,0.00230791,0.0013751272,0.0064156493],"category_scores_gemma":[0.0039137937,0.00045711154,0.001191483,0.0016454316,0.0007837307,0.0016346321,0.0015079144,0.0011643621,0.0007153725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046515604,0.000100820784,0.0005441221,0.00012623963,0.000053787295,0.00021164377,0.00025675292,0.84465873,0.0006551978,0.109397754,0.0020612278,0.0418871],"study_design_scores_gemma":[0.000031821364,0.000030157504,0.000104347106,0.000048480113,0.000027654081,0.00003196429,0.00016010886,0.9591022,0.00051211775,0.031395763,0.008540874,0.000014387909],"about_ca_topic_score_codex":0.042388894,"about_ca_topic_score_gemma":0.051266786,"teacher_disagreement_score":0.042388894,"about_ca_system_score_codex":0.00422676,"about_ca_system_score_gemma":0.0076225917,"threshold_uncertainty_score":0.084284306},"labels":[],"label_agreement":null},{"id":"W2131814871","doi":"10.5555/2431518.2431923","title":"Defining background tasks in SimFC","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Process (computing); Simplicity; Resource (disambiguation); Industrial engineering; Construction management; Simulation modeling; Estimator; Systems engineering; Simulation; Engineering; Civil engineering","score_opus":0.0475899128239266,"score_gpt":0.25295781974913323,"score_spread":0.20536790692520662,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2131814871","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029105097,0.00010197644,0.9568005,0.000118386604,0.000027594348,0.00040797616,0.00046684543,0.0021043809,0.010867186],"genre_scores_gemma":[0.22920336,0.00022586383,0.7625774,0.000122057456,0.00001769129,0.0010792854,0.0015181889,0.0007966443,0.0044594384],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99825317,0.0005635331,0.00014809749,0.0002702521,0.00047500245,0.00028981347],"domain_scores_gemma":[0.99751127,0.0009907848,0.00018032781,0.0006832716,0.00046763755,0.00016672094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002186221,0.001127021,0.0006699721,0.0011175899,0.0008157141,0.002318906,0.0018061796,0.0014709067,0.004200656],"category_scores_gemma":[0.0057917098,0.00068427046,0.000766115,0.000883894,0.0014334285,0.00233747,0.0028540944,0.0014788525,0.00127662],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034797072,0.00021502783,0.0054281424,0.00040133428,0.000033058146,0.00037185257,0.0024421471,0.6686011,0.0076545537,0.21865848,0.0041220314,0.09172433],"study_design_scores_gemma":[0.00004658618,0.000076331664,0.00056582195,0.000107425454,0.000016016109,0.00012947395,0.00029567408,0.8955777,0.007194607,0.039846748,0.05611087,0.0000327167],"about_ca_topic_score_codex":0.010933826,"about_ca_topic_score_gemma":0.008198131,"teacher_disagreement_score":0.010933826,"about_ca_system_score_codex":0.0017114182,"about_ca_system_score_gemma":0.0037075821,"threshold_uncertainty_score":0.021740377},"labels":[],"label_agreement":null},{"id":"W2132272389","doi":"10.1061/9780784412329.123","title":"Data Management for Construction Processes Using Fuzzy Approach","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Fuzzy logic; Data mining; Artificial intelligence","score_opus":0.14654049767711463,"score_gpt":0.36312860545628944,"score_spread":0.2165881077791748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2132272389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007400671,0.00030815107,0.9854138,0.00032620423,0.000053725613,0.00049053534,0.0012130584,0.001538475,0.003255328],"genre_scores_gemma":[0.12990628,0.0005656885,0.86418676,0.00009450083,0.00003974233,0.0006820523,0.0027519478,0.00008935486,0.0016837239],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99474347,0.00091481605,0.0011324936,0.0009796104,0.0019947567,0.00023479927],"domain_scores_gemma":[0.99313,0.0028434752,0.00065662194,0.0011441516,0.002072712,0.00015303367],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064455336,0.0007235276,0.001109521,0.005315847,0.00221264,0.0059002214,0.0022920596,0.0011295802,0.003397045],"category_scores_gemma":[0.014838172,0.00060515595,0.002017677,0.00518218,0.0008223899,0.004759065,0.0021211053,0.0015434816,0.0010062347],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003974086,0.00036946358,0.008045782,0.0011543425,0.00028555177,0.0007890723,0.0024016178,0.15005693,0.011031419,0.10818051,0.0074890447,0.70979893],"study_design_scores_gemma":[0.00007665522,0.00014480967,0.003502762,0.00047045806,0.00018666312,0.00045377424,0.0015315348,0.8021793,0.01984379,0.10016222,0.07129688,0.0001512169],"about_ca_topic_score_codex":0.013453116,"about_ca_topic_score_gemma":0.008559581,"teacher_disagreement_score":0.013453116,"about_ca_system_score_codex":0.0025487975,"about_ca_system_score_gemma":0.004233209,"threshold_uncertainty_score":0.0340876},"labels":[],"label_agreement":null},{"id":"W2134842528","doi":"10.1139/l06-051","title":"Cost management for concrete batch plant using stochastic mathematical models","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Total cost; Computer science; Unit (ring theory); Stochastic modelling; Unit cost; Operations research; Value (mathematics); Operations management; Engineering; Statistics; Mathematics; Economics; Accounting","score_opus":0.01661622597421017,"score_gpt":0.19157299030549907,"score_spread":0.1749567643312889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134842528","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16742161,0.0006492665,0.8190668,0.0006974221,0.00005811709,0.00022550588,0.0005610254,0.00020485406,0.0111153815],"genre_scores_gemma":[0.96088666,0.00066800334,0.031237694,0.000050086735,0.000031191754,0.00032214608,0.00030128603,0.00004241674,0.006460455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988637,0.00038130232,0.00006125713,0.00017567605,0.0003594645,0.00015864168],"domain_scores_gemma":[0.99677175,0.0020207923,0.0007155344,0.00005693332,0.000370892,0.00006404135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019542463,0.001230911,0.0007903034,0.0012539905,0.00047226346,0.0016127671,0.0014373056,0.0010939586,0.00205195],"category_scores_gemma":[0.004578643,0.0007420672,0.0012353114,0.0010225261,0.00061255874,0.001616139,0.00066910614,0.0010833766,0.00020741625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007924004,0.0000104271385,0.00043997698,0.000012359092,0.000008597645,0.0000155954,0.000012120692,0.99411446,0.0001252395,0.0037900168,0.00008846744,0.0013747308],"study_design_scores_gemma":[0.0000026254677,0.000011034483,0.00020356728,0.0000033880362,0.0000064043156,0.0000063088332,0.00001154393,0.9983388,0.00007810146,0.0012104687,0.00012313547,0.0000045953534],"about_ca_topic_score_codex":0.027122872,"about_ca_topic_score_gemma":0.018745355,"teacher_disagreement_score":0.027122872,"about_ca_system_score_codex":0.0035387722,"about_ca_system_score_gemma":0.0023077466,"threshold_uncertainty_score":0.053930044},"labels":[],"label_agreement":null},{"id":"W2134977903","doi":"10.1061/(asce)1052-3928(2004)130:2(109)","title":"Lessons Learned in Designing Research Methodology in Field-Based Construction Research","year":2004,"lang":"en","type":"article","venue":"Journal of Professional Issues in Engineering Education and Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bridge (graph theory); Data collection; Field (mathematics); Computer science; Management science; Construction management; Engineering; Construction industry; Systems engineering; Construction engineering; Engineering management; Civil engineering","score_opus":0.2645780431505085,"score_gpt":0.5352989676198172,"score_spread":0.27072092446930873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2134977903","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047045564,0.005511491,0.9461362,0.028364113,0.0014168117,0.0027362944,0.00008677092,0.0003151114,0.010728756],"genre_scores_gemma":[0.042829223,0.0033337323,0.94425046,0.0029997753,0.0005348359,0.004401964,0.00006066044,0.00012806334,0.0014612587],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.6669548,0.28746,0.017469605,0.006550509,0.01903117,0.002533855],"domain_scores_gemma":[0.48550236,0.42784363,0.0065087755,0.032406956,0.043740965,0.003997281],"candidate_categories":["metaresearch"],"consensus_categories":["metaresearch"],"category_scores_codex":[0.3068559,0.0024270848,0.0030968778,0.0070447205,0.0052554403,0.017505432,0.007691948,0.007990727,0.0048263283],"category_scores_gemma":[0.31531256,0.0023636366,0.002724003,0.0073125777,0.030343452,0.025897078,0.0076176263,0.015402951,0.0027328387],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016709373,0.00071625476,0.0052467254,0.006538713,0.00024615708,0.0010722219,0.04367456,0.008491472,0.0011487476,0.6795952,0.009039961,0.24406295],"study_design_scores_gemma":[0.00022150668,0.0004124008,0.0015634544,0.009032854,0.000105909945,0.0010293608,0.016183166,0.011396942,0.0018693791,0.86612344,0.091842204,0.00021934861],"about_ca_topic_score_codex":0.005942348,"about_ca_topic_score_gemma":0.008704301,"teacher_disagreement_score":0.6931441,"about_ca_system_score_codex":0.010385428,"about_ca_system_score_gemma":0.017222783,"threshold_uncertainty_score":0.85477006},"labels":[],"label_agreement":null},{"id":"W2135413109","doi":"10.1139/l02-023","title":"Bid preparation for earthmoving operations","year":2002,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scope (computer science); Plan (archaeology); Key (lock); Work (physics); Engineering; Duration (music); Cost estimate; Computer science; Operations research; Construction engineering; Transport engineering; Systems engineering; Computer security","score_opus":0.0091790690364937,"score_gpt":0.1813414417311084,"score_spread":0.17216237269461468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135413109","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17467916,0.00038926405,0.6351527,0.00064607494,0.0004277052,0.004541296,0.011032787,0.08803186,0.08509906],"genre_scores_gemma":[0.616113,0.00036797833,0.3241474,0.00012606478,0.00012187582,0.0013357073,0.020543545,0.0029186187,0.0343259],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99877745,0.00030187974,0.00012910552,0.00023009973,0.00046632846,0.00009513636],"domain_scores_gemma":[0.99666685,0.0009945531,0.00033607104,0.00096431986,0.00070148736,0.00033666962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019457473,0.00082371966,0.00069248,0.0021738934,0.0011881562,0.0027272254,0.0017271215,0.0004827487,0.039635602],"category_scores_gemma":[0.0064395363,0.0006686399,0.00042618837,0.0013448502,0.00020189675,0.0016235969,0.0013799511,0.00082027126,0.010574505],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020794584,0.0010230158,0.02112592,0.00036246394,0.00008172057,0.0005185069,0.0011386377,0.050961856,0.010763009,0.013335678,0.09163287,0.8069768],"study_design_scores_gemma":[0.00062755693,0.0007728688,0.024371687,0.00013309368,0.00012600108,0.00073492795,0.0011323227,0.5939141,0.046402026,0.008363234,0.3231175,0.00030475616],"about_ca_topic_score_codex":0.0054166582,"about_ca_topic_score_gemma":0.004846171,"teacher_disagreement_score":0.039635602,"about_ca_system_score_codex":0.0009991394,"about_ca_system_score_gemma":0.0017545252,"threshold_uncertainty_score":0.13259429},"labels":[],"label_agreement":null},{"id":"W2135572933","doi":"10.1061/(asce)co.1943-7862.0000648","title":"Enhancing Construction As-Built Documentation Using Interactive Voice Response","year":2012,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Documentation; Interactive voice response; Computer science; Schedule; Scheduling (production processes); Multimedia; Service (business); Human–computer interaction; Engineering; Telecommunications; Operations management; Operating system","score_opus":0.00606252945336838,"score_gpt":0.23629850217153672,"score_spread":0.23023597271816834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135572933","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15242063,0.00038796855,0.8045968,0.0003015565,0.00012578347,0.00045302245,0.0001855845,0.018134179,0.02339448],"genre_scores_gemma":[0.54940695,0.00039422075,0.4369899,0.00013261233,0.00009345636,0.0003208691,0.00030637727,0.000745922,0.0116096875],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9963062,0.0018813227,0.0001697669,0.00032574162,0.0010603665,0.00025670443],"domain_scores_gemma":[0.99431384,0.0033431163,0.00046093354,0.0007553162,0.0009692489,0.00015754704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026310019,0.00077017717,0.0004453912,0.0015386166,0.00029395855,0.0013091667,0.00096551614,0.0006719979,0.005290292],"category_scores_gemma":[0.0061260234,0.0002640384,0.0003726649,0.0007706371,0.00030458425,0.0013354962,0.0014275842,0.00045225723,0.0018586931],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005319038,0.0007171063,0.0036907115,0.0007827552,0.000036735324,0.00050657324,0.0043747937,0.012475536,0.099020146,0.003728089,0.0056209527,0.86851466],"study_design_scores_gemma":[0.00051071384,0.0034420479,0.024903333,0.0008708265,0.00033646784,0.0030946098,0.005703936,0.26534754,0.41277725,0.008261159,0.27419287,0.0005591891],"about_ca_topic_score_codex":0.0005345283,"about_ca_topic_score_gemma":0.0007966327,"teacher_disagreement_score":0.005290292,"about_ca_system_score_codex":0.00028006008,"about_ca_system_score_gemma":0.0006447512,"threshold_uncertainty_score":0.017697811},"labels":[],"label_agreement":null},{"id":"W2135726511","doi":"10.1139/l10-108","title":"Scheduling model for repetitive construction processes for high-rise buildings","year":2010,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Computer science; Industrial engineering; Construction management; Two-level scheduling; Distributed computing; Engineering; Dynamic priority scheduling; Schedule; Operations management; Civil engineering","score_opus":0.006114717840400141,"score_gpt":0.1843259221754707,"score_spread":0.17821120433507057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135726511","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039895453,0.00013494372,0.9515989,0.00019281943,0.00005432812,0.00013486871,0.00013965841,0.0002941727,0.0075549623],"genre_scores_gemma":[0.8654712,0.00048934965,0.11603852,0.00007283077,0.000055044064,0.0005390434,0.0003781985,0.000106209765,0.016849615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999275,0.0001697444,0.00003984283,0.00016946554,0.00021749848,0.00012841324],"domain_scores_gemma":[0.9993529,0.0002640787,0.00013756259,0.000044691682,0.00014954379,0.000051265026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012093299,0.0007726078,0.0007235583,0.0005043184,0.000739863,0.0011803445,0.0017705719,0.0010139341,0.0045668203],"category_scores_gemma":[0.0014819192,0.00040278846,0.0010762074,0.0006924133,0.00073177397,0.001132541,0.00061908294,0.0011667619,0.00075273425],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039215556,0.000040842413,0.00021284244,0.000039973074,0.000008847764,0.00007352721,0.00006996345,0.9687118,0.0016290596,0.02464052,0.0002638948,0.0042696362],"study_design_scores_gemma":[0.000011587147,0.000023417866,0.00006490903,0.0000022723268,0.000006199031,0.000009620816,0.000010153779,0.9958734,0.00028262174,0.0032936423,0.0004177574,0.000004335561],"about_ca_topic_score_codex":0.015401071,"about_ca_topic_score_gemma":0.0090788705,"teacher_disagreement_score":0.015401071,"about_ca_system_score_codex":0.0017926167,"about_ca_system_score_gemma":0.0029381756,"threshold_uncertainty_score":0.03062284},"labels":[],"label_agreement":null},{"id":"W2135736703","doi":"10.1109/wsc.2003.1261599","title":"An application of lean concepts and simulation for drainage operations maintenance crews","year":2004,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Drainage; Engineering; Productivity; Work (physics); Maintenance engineering; Computer science; Reliability engineering; Aeronautics; Mechanical engineering","score_opus":0.008117259914974266,"score_gpt":0.26438792448717036,"score_spread":0.2562706645721961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135736703","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38559234,0.00012983107,0.5934245,0.00049915357,0.00006779886,0.00045391507,0.00019652181,0.0009548096,0.018681053],"genre_scores_gemma":[0.73981446,0.00014299066,0.25792634,0.00004196699,0.000008213969,0.0003582201,0.00012324836,0.000056199402,0.0015284661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99927074,0.00045501333,0.000027814845,0.000045452998,0.00015451343,0.000046532743],"domain_scores_gemma":[0.9972595,0.0021303296,0.00009908792,0.00014221085,0.0002913542,0.00007752928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017419014,0.0005571866,0.00031263666,0.000649315,0.00064161205,0.0011204152,0.0008151504,0.0007834071,0.0015884088],"category_scores_gemma":[0.0042345943,0.00033915497,0.0003549116,0.0007917095,0.00064701826,0.00066338363,0.001012035,0.00061918626,0.00012923847],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002508514,0.00037522087,0.005656122,0.00008177777,0.00003821725,0.00014933835,0.0010291951,0.91456723,0.0026530474,0.025381334,0.0005594661,0.049258344],"study_design_scores_gemma":[0.00003026834,0.00008793671,0.00044851418,0.000015182403,0.000008747563,0.000014677364,0.00019598861,0.992336,0.0011673382,0.0038573924,0.0018294108,0.000008635382],"about_ca_topic_score_codex":0.012283222,"about_ca_topic_score_gemma":0.0106444685,"teacher_disagreement_score":0.012283222,"about_ca_system_score_codex":0.001227232,"about_ca_system_score_gemma":0.0014183377,"threshold_uncertainty_score":0.02442348},"labels":[],"label_agreement":null},{"id":"W2135975163","doi":"10.1061/41084(364)50","title":"Guide for Seismic Rehabilitation of Existing Concrete Buildings: Vision","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Construction engineering; Resource (disambiguation); Rehabilitation; Computer science; Civil engineering; Engineering; Architectural engineering","score_opus":0.011118216446530839,"score_gpt":0.26962813094573324,"score_spread":0.2585099144992024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2135975163","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0049252002,0.011036229,0.4285985,0.012655458,0.0027634618,0.001978933,0.010375939,0.019650016,0.5080163],"genre_scores_gemma":[0.013512027,0.01383482,0.44309536,0.0028264103,0.00035553682,0.0015521258,0.013524003,0.0016172742,0.5096824],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99884474,0.00012674608,0.00008061243,0.00006269785,0.0008049444,0.0000803016],"domain_scores_gemma":[0.9984408,0.000104210645,0.00006754814,0.00011092192,0.0011102903,0.00016623981],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001353276,0.0016988316,0.000563417,0.0032609797,0.00083428493,0.0023000578,0.0019094124,0.0028549249,0.02946279],"category_scores_gemma":[0.0019577623,0.00086022547,0.00051921105,0.0015187965,0.00082107715,0.0023333547,0.002342438,0.0021724447,0.039502397],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026987156,0.00018420017,0.00049631036,0.00044608358,0.000005583835,0.00015906736,0.0005159222,0.005653712,0.0025281394,0.035036318,0.5589044,0.39604324],"study_design_scores_gemma":[0.000007103606,0.000026714248,0.00040952512,0.00014693187,0.0000022728689,0.00014472441,0.00014732826,0.00088773406,0.00024245934,0.0034488926,0.9945229,0.000013369875],"about_ca_topic_score_codex":0.015471504,"about_ca_topic_score_gemma":0.028140804,"teacher_disagreement_score":0.02946279,"about_ca_system_score_codex":0.0013018579,"about_ca_system_score_gemma":0.007596984,"threshold_uncertainty_score":0.09856284},"labels":[],"label_agreement":null},{"id":"W2136062440","doi":"10.5555/1351542.1351908","title":"Process flowcharting and simulation of house structure components production process","year":2007,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Flowchart; Production (economics); Manufacturing engineering; Lean manufacturing; Factory (object-oriented programming); Computer science; Construct (python library); Productivity; Process management; Chart; Plan (archaeology); Process modeling; Work in process; Engineering; Industrial engineering; Systems engineering; Operations management","score_opus":0.020523619329051803,"score_gpt":0.2702818307865388,"score_spread":0.24975821145748697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2136062440","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16314416,0.00009241553,0.8223945,0.0001527546,0.000059187063,0.0004066764,0.00084671384,0.0056091193,0.007294481],"genre_scores_gemma":[0.7696504,0.00025384838,0.22526535,0.000025893938,0.000009806921,0.0006006778,0.0010800719,0.00014989714,0.0029640645],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996,0.00017854052,0.000027175813,0.000056225716,0.00009785844,0.000040297222],"domain_scores_gemma":[0.9983779,0.0011984772,0.00008776001,0.000103883984,0.00018689045,0.00004513528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011059669,0.00054224074,0.00036036185,0.00070760597,0.00038339192,0.0008691032,0.0005847229,0.00063204987,0.004018623],"category_scores_gemma":[0.0022851177,0.00029610613,0.0005227809,0.00057835184,0.0004312184,0.00068038085,0.00038458672,0.00051093154,0.00023978445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014544143,0.00008490904,0.0018079154,0.00007282693,0.0000124041135,0.00008575006,0.0002861985,0.9659465,0.0038908024,0.0071812067,0.00042376155,0.020062324],"study_design_scores_gemma":[0.000022297652,0.000032159674,0.0002814697,0.000010222423,0.0000062145923,0.000008585368,0.000018407734,0.9944194,0.0028373753,0.0009163741,0.0014376271,0.00000982229],"about_ca_topic_score_codex":0.014021599,"about_ca_topic_score_gemma":0.006551497,"teacher_disagreement_score":0.014021599,"about_ca_system_score_codex":0.00093049515,"about_ca_system_score_gemma":0.001773573,"threshold_uncertainty_score":0.027879953},"labels":[],"label_agreement":null},{"id":"W2138204878","doi":"10.1061/40754(183)135","title":"Selecting Pile Construction Method Using Fuzzy Approach","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Pile; Robustness (evolution); Fuzzy logic; Sensitivity (control systems); Computer science; Fuzzy set; Engineering; Data mining; Artificial intelligence; Algorithm","score_opus":0.016877043817336224,"score_gpt":0.24610738118204334,"score_spread":0.2292303373647071,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138204878","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06617944,0.000077497316,0.9269292,0.000056917877,0.000018501294,0.00013156062,0.00007531942,0.00045877852,0.006072772],"genre_scores_gemma":[0.5977797,0.00012424268,0.39921987,0.00001914958,0.000010644196,0.000105979125,0.00013532964,0.000037306694,0.0025678102],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993599,0.00017352536,0.00003651908,0.000076952376,0.000308601,0.0000445122],"domain_scores_gemma":[0.99945587,0.00018277638,0.000044574375,0.000055231412,0.00023299865,0.000028470471],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082392374,0.00040733014,0.0004330154,0.0013335389,0.00038287745,0.0007844712,0.00045969267,0.0004686516,0.0025298933],"category_scores_gemma":[0.0023849665,0.00020374784,0.00041337244,0.00069755234,0.0002538411,0.0007055723,0.00045348043,0.00021844357,0.00051900774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004705613,0.00015292404,0.007854968,0.00047019435,0.00008382728,0.00055227743,0.0006872381,0.28502485,0.064152166,0.015943892,0.0033973223,0.62120974],"study_design_scores_gemma":[0.000048440343,0.00017156749,0.0033533734,0.0000722239,0.00004569558,0.00037777043,0.00039336717,0.94768286,0.03093145,0.008636187,0.008212612,0.00007439766],"about_ca_topic_score_codex":0.0021166902,"about_ca_topic_score_gemma":0.002782888,"teacher_disagreement_score":0.0025298933,"about_ca_system_score_codex":0.00034953223,"about_ca_system_score_gemma":0.00053859875,"threshold_uncertainty_score":0.008463323},"labels":[],"label_agreement":null},{"id":"W2138349055","doi":"10.5555/2675983.2676387","title":"Effective simulation of earth moving projects","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Context (archaeology); Process (computing); Task (project management); Earth observation; Resource (disambiguation); Systems engineering; Software engineering; Industrial engineering; Simulation; Engineering; Programming language; Aerospace engineering; Geology","score_opus":0.015447538257242828,"score_gpt":0.23656339037135962,"score_spread":0.2211158521141168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138349055","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44387904,0.00014657718,0.4961744,0.00025919444,0.000049685517,0.00026882917,0.00086631725,0.0018173887,0.05653844],"genre_scores_gemma":[0.93181485,0.00018599424,0.06268439,0.000024062798,0.000005890491,0.00022820919,0.00039634123,0.000120587836,0.004539657],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996276,0.00012243008,0.000023648838,0.000041363503,0.0001377473,0.000047298014],"domain_scores_gemma":[0.9994715,0.00028080872,0.000046756977,0.00007494323,0.00009143403,0.0000346969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006075829,0.00040402985,0.0004889486,0.00053459196,0.00038897595,0.0009487067,0.0008329394,0.0009585301,0.0032062847],"category_scores_gemma":[0.0017828004,0.00026674452,0.00040045546,0.00070298795,0.0004463528,0.0009212967,0.00086639205,0.00044652706,0.00030723005],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012935656,0.000014915794,0.00056324346,0.000012773665,0.000003817192,0.00003305003,0.00004323567,0.99186665,0.00043476187,0.0036358503,0.00013149247,0.0032473064],"study_design_scores_gemma":[0.000008643099,0.0000128799,0.00023213367,0.000005153864,0.0000028795675,0.000010336596,0.0000318887,0.99626225,0.0008122128,0.0013223046,0.0012957554,0.0000035971534],"about_ca_topic_score_codex":0.0102943,"about_ca_topic_score_gemma":0.0061130105,"teacher_disagreement_score":0.0102943,"about_ca_system_score_codex":0.00074687833,"about_ca_system_score_gemma":0.0011455483,"threshold_uncertainty_score":0.020468712},"labels":[],"label_agreement":null},{"id":"W2138906600","doi":"10.1061/(asce)0742-597x(2009)25:1(12)","title":"Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance","year":2008,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":212,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Construction management; Process (computing); Engineering; Construction industry; Quality (philosophy); Project management; Integrated project delivery; Simulation modeling; Construction engineering; Computer science; Operations research; Systems engineering; Civil engineering","score_opus":0.011925511758755848,"score_gpt":0.20372588228247263,"score_spread":0.1918003705237168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138906600","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9889599,0.00006192442,0.0030135375,0.00010245797,0.0000051320912,0.000027059457,0.00001978259,0.000026128911,0.0077840807],"genre_scores_gemma":[0.9974632,0.000046380497,0.0011405121,0.000010500577,0.0000025433362,0.00001697832,0.000038731596,0.000011685018,0.0012695696],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9815655,0.0112608895,0.0006940518,0.00074801093,0.004013247,0.0017183042],"domain_scores_gemma":[0.9019159,0.063179724,0.013449801,0.005403545,0.008561256,0.0074897483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0145806875,0.0005869852,0.00036196012,0.0012236545,0.001494784,0.0024424025,0.00105414,0.00088518986,0.0054960568],"category_scores_gemma":[0.047162283,0.00041372117,0.00033815895,0.00095694966,0.0011492656,0.0013369444,0.0019238144,0.0012440622,0.00077094603],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005037501,0.0071365004,0.575343,0.0003694275,0.0002233397,0.0021389052,0.025721997,0.06617775,0.026598616,0.009408455,0.0014691846,0.28037536],"study_design_scores_gemma":[0.00024218057,0.0076208482,0.83466625,0.0002535638,0.00017442649,0.001306158,0.03231038,0.08430506,0.018340576,0.0042260434,0.01626192,0.0002925672],"about_ca_topic_score_codex":0.0076187225,"about_ca_topic_score_gemma":0.008877306,"teacher_disagreement_score":0.0145806875,"about_ca_system_score_codex":0.0026064978,"about_ca_system_score_gemma":0.0034962012,"threshold_uncertainty_score":0.077110946},"labels":[],"label_agreement":null},{"id":"W2138951297","doi":"10.5555/1516744.1517174","title":"A simulation template for modeling tunnel shaft construction","year":2008,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; University of Alberta","funders":"","keywords":"Visualization; Tunnel construction; Template; Code (set theory); Computer science; Engineering; Systems engineering; Construction engineering; Data mining; Structural engineering","score_opus":0.05861605281988389,"score_gpt":0.2692427108025743,"score_spread":0.2106266579826904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2138951297","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00936857,0.000037826907,0.9788452,0.00005887322,0.000035950263,0.00019066867,0.0007346415,0.003075627,0.0076526375],"genre_scores_gemma":[0.17048033,0.00032878923,0.81837445,0.00003441939,0.000017935205,0.0010774971,0.0022745489,0.0010527268,0.006359353],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995221,0.00014342158,0.000055354616,0.00005793827,0.00019225101,0.000028984485],"domain_scores_gemma":[0.9991278,0.00036542385,0.00006124529,0.00017831226,0.00022010227,0.000047124475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010113987,0.00067950704,0.00058373425,0.00083321764,0.0004680333,0.0010787253,0.0014721748,0.0008060533,0.008270937],"category_scores_gemma":[0.002536806,0.00058936636,0.001135637,0.00075991714,0.00041750778,0.0009415106,0.0009287826,0.0007017182,0.0015278363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006138203,0.000052522464,0.0015917259,0.00012244271,0.00003191198,0.00014254054,0.00027550186,0.9224252,0.0045271004,0.03562586,0.0028672058,0.03227654],"study_design_scores_gemma":[0.000012581086,0.000016327673,0.00013247273,0.00002267407,0.000008469482,0.00003940751,0.00002441311,0.98040926,0.0021323133,0.003333828,0.013855751,0.000012535264],"about_ca_topic_score_codex":0.005642869,"about_ca_topic_score_gemma":0.0052586393,"teacher_disagreement_score":0.008270937,"about_ca_system_score_codex":0.0007386513,"about_ca_system_score_gemma":0.0015769815,"threshold_uncertainty_score":0.027669072},"labels":[],"label_agreement":null},{"id":"W2140690096","doi":"10.1061/9780784412329.057","title":"A Framework for an Integrated and Evolutionary Body of Knowledge","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; École de Technologie Supérieure; Cégep Marie-Victorin","funders":"","keywords":"Knowledge management; Computer science; Situated; Process (computing); Sustainability; Context (archaeology); Fragmentation (computing); Body of knowledge; Process management; Engineering; Artificial intelligence","score_opus":0.05392149397242824,"score_gpt":0.3539983836410189,"score_spread":0.30007688966859064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2140690096","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006200737,0.0018173838,0.87926084,0.01277198,0.00018445999,0.00053798466,0.00018526072,0.00034696693,0.0986945],"genre_scores_gemma":[0.15646449,0.0013070103,0.83030206,0.00087072625,0.00012729407,0.0012523282,0.0004133885,0.00009547934,0.009167285],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.988982,0.0061165746,0.0010043514,0.0016025242,0.0016460787,0.0006484111],"domain_scores_gemma":[0.99079293,0.0042976695,0.0006816191,0.0019643896,0.0014658708,0.00079744915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01624434,0.000920087,0.0010937784,0.007004362,0.004198484,0.013270448,0.0042463248,0.004786523,0.0057740672],"category_scores_gemma":[0.01086754,0.0008733041,0.0020613766,0.0055807508,0.023102056,0.017006038,0.008398721,0.0033975665,0.001583155],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000028765103,0.000011149188,0.00012357392,0.000054112603,0.000009099511,0.00008298758,0.0018853719,0.0010797819,0.00012676051,0.99015206,0.00048742906,0.005984835],"study_design_scores_gemma":[0.000015898528,0.000022471548,0.00016764358,0.00023658405,0.000014469205,0.00015286672,0.0015425872,0.0038214372,0.00014457763,0.9210007,0.07286091,0.000019920084],"about_ca_topic_score_codex":0.0098726135,"about_ca_topic_score_gemma":0.0069318465,"teacher_disagreement_score":0.01624434,"about_ca_system_score_codex":0.0072972486,"about_ca_system_score_gemma":0.013027755,"threshold_uncertainty_score":0.08590931},"labels":[],"label_agreement":null},{"id":"W2141122753","doi":"10.1061/(asce)0733-9364(2004)130:5(638)","title":"Planning and Scheduling Highway Construction","year":2004,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Unavailability; Scheduling (production processes); Computer science; Software; Project planning; Operations research; Transport engineering; Software engineering; Systems engineering; Industrial engineering; Project management; Engineering; Operations management; Operating system; Reliability engineering","score_opus":0.004811195081526139,"score_gpt":0.18399221063971358,"score_spread":0.17918101555818744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141122753","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07603765,0.00025435738,0.88492185,0.00040753317,0.000073752126,0.00042817733,0.0018460096,0.0013078949,0.034722827],"genre_scores_gemma":[0.56442213,0.0009086438,0.41511688,0.000051294064,0.000025649832,0.0007534575,0.0024420533,0.0003258862,0.015953958],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996345,0.000096735545,0.000021645468,0.00007814318,0.000114571594,0.000054411354],"domain_scores_gemma":[0.9997831,0.00007884113,0.000031620184,0.000031055115,0.00004389023,0.000031626518],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052068697,0.00050076836,0.00046626703,0.00049788883,0.00054914254,0.0015266888,0.0011330831,0.0006590403,0.005557939],"category_scores_gemma":[0.0007980095,0.00049421395,0.00056695513,0.0007284234,0.00045173182,0.00094126665,0.00058320124,0.00051897083,0.0007606119],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036259462,0.00003471831,0.0007567098,0.00004400985,0.000008010448,0.000048955477,0.00007182798,0.9639121,0.0007376989,0.01865865,0.0008444087,0.014846698],"study_design_scores_gemma":[0.000023778555,0.00003941486,0.0004490096,0.000018411813,0.000012271149,0.000030301284,0.00008554254,0.97185016,0.001017835,0.012210737,0.014246591,0.000015994905],"about_ca_topic_score_codex":0.023759812,"about_ca_topic_score_gemma":0.020658841,"teacher_disagreement_score":0.023759812,"about_ca_system_score_codex":0.0014827308,"about_ca_system_score_gemma":0.0031276986,"threshold_uncertainty_score":0.04724306},"labels":[],"label_agreement":null},{"id":"W2141452637","doi":"10.5555/2675983.2676355","title":"Utilizing simulation derived quantitative formulas for accurate excavator Hauler fleet selection","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Excavator; Earthworks; Granularity; Computer science; Selection (genetic algorithm); Discrete event simulation; Field (mathematics); Production (economics); Duration (music); Industrial engineering; Operations research; Engineering; Simulation; Civil engineering; Artificial intelligence; Mathematics","score_opus":0.055052437493833185,"score_gpt":0.29979217662287627,"score_spread":0.2447397391290431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2141452637","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071414635,0.00005306799,0.9856711,0.000053672396,0.000019705449,0.00003078794,0.00018499422,0.00029304007,0.0065522534],"genre_scores_gemma":[0.53011537,0.0005689794,0.46293762,0.00007911789,0.000032196072,0.00032363416,0.00083938113,0.0004772239,0.004626498],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999332,0.00018903821,0.00006485509,0.00007452967,0.0002837729,0.00005583367],"domain_scores_gemma":[0.99708986,0.0016631774,0.00030553836,0.00025050007,0.0006541004,0.00003673139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001489528,0.00076875434,0.0005523623,0.001374722,0.00031948063,0.0011755942,0.0008820721,0.00046564784,0.004071294],"category_scores_gemma":[0.00737852,0.0004177307,0.00052107224,0.0011239632,0.00039172365,0.0016517083,0.0005958851,0.0007838902,0.00079358614],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008423484,0.000014876894,0.0006656215,0.000040950512,0.0000057022025,0.000020692869,0.000029771483,0.95386225,0.0010263172,0.024639556,0.0004931707,0.019192623],"study_design_scores_gemma":[0.0000021432643,0.000007988957,0.0001262957,0.000013082578,0.0000033901522,0.000014485182,0.000013228891,0.990712,0.001032828,0.006210134,0.0018581845,0.0000063056373],"about_ca_topic_score_codex":0.006547355,"about_ca_topic_score_gemma":0.0074625965,"teacher_disagreement_score":0.006547355,"about_ca_system_score_codex":0.0012075796,"about_ca_system_score_gemma":0.0011945724,"threshold_uncertainty_score":0.01361984},"labels":[],"label_agreement":null},{"id":"W2142329171","doi":"10.5555/2693848.2694258","title":"Simulation-based multiobjective optimization of bridge construction processes using parallel computing","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Sorting; Bridge (graph theory); Multi-objective optimization; Convergence (economics); Discrete event simulation; Mathematical optimization; Genetic algorithm; Computation; Distributed computing; sort; Range (aeronautics); Pareto principle; Resource (disambiguation); Algorithm; Simulation; Engineering; Mathematics","score_opus":0.014473997031874882,"score_gpt":0.23870869202765216,"score_spread":0.22423469499577728,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2142329171","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066762954,0.00036774352,0.9201853,0.00018782592,0.000054664208,0.00012828871,0.000064264765,0.0003094913,0.011939404],"genre_scores_gemma":[0.8624816,0.0005094997,0.1333161,0.000038532624,0.000022899014,0.00041208262,0.000109118584,0.000059131868,0.0030510814],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968624,0.00013293861,0.000012555162,0.000038500475,0.00009314135,0.000036629874],"domain_scores_gemma":[0.9996624,0.00019988124,0.000041302817,0.000023735818,0.000051879004,0.000020757667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007316439,0.0008125621,0.0010803543,0.0006056481,0.000656651,0.0009576073,0.0007054755,0.00074775144,0.0013190736],"category_scores_gemma":[0.0008819527,0.0005213773,0.001038134,0.0009370088,0.0006267041,0.00051937316,0.00076325116,0.00061302824,0.00015323432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000061461787,0.0000058495707,0.00006962591,0.0000070555993,0.0000048068546,0.000008906805,0.0000040979917,0.9977049,0.00023805076,0.0006075695,0.000019178651,0.0013237776],"study_design_scores_gemma":[0.000003101535,0.000006000265,0.000027800246,0.000001077696,0.0000016898347,0.0000019983047,0.0000018141733,0.99932647,0.00012979812,0.00040799464,0.00009118914,0.0000010715164],"about_ca_topic_score_codex":0.00997794,"about_ca_topic_score_gemma":0.006192183,"teacher_disagreement_score":0.00997794,"about_ca_system_score_codex":0.0010124361,"about_ca_system_score_gemma":0.0019054572,"threshold_uncertainty_score":0.019839704},"labels":[],"label_agreement":null},{"id":"W2143380513","doi":"10.1061/40704(2003)8","title":"A Unified Approach to Project Management","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Interdependence; Task (project management); Project management; Work (physics); Focus (optics); Representation (politics); Project management triangle; Process management; Knowledge management; Management science; Systems engineering; Engineering","score_opus":0.014555246321302515,"score_gpt":0.20486451401495934,"score_spread":0.19030926769365683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143380513","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021211386,0.0033739477,0.9150287,0.0072815823,0.00031202083,0.00018208884,0.00010647324,0.00036401712,0.07123003],"genre_scores_gemma":[0.11170879,0.006017034,0.86334383,0.0009637106,0.0003863259,0.0009877223,0.00032178953,0.00017313793,0.016097598],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9890765,0.005277738,0.00086804165,0.0011716881,0.00305583,0.0005502543],"domain_scores_gemma":[0.9978346,0.0004659536,0.00020205001,0.0006664068,0.0005549732,0.0002759056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008125554,0.0011897365,0.0011639433,0.004368291,0.0032918483,0.015137167,0.004858017,0.00292082,0.004337482],"category_scores_gemma":[0.005139589,0.000983455,0.0014734905,0.005832991,0.008089742,0.01292692,0.008260184,0.0042743874,0.0018035484],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003528773,0.000015328202,0.000083155996,0.000069837566,0.000009906453,0.000036046866,0.00074886665,0.0028657264,0.0001075385,0.97265506,0.0022926324,0.021112408],"study_design_scores_gemma":[0.000012015223,0.00003441646,0.00016174749,0.00028946376,0.000019685456,0.00012916693,0.0011471043,0.010759499,0.0002177325,0.8080719,0.1791297,0.000027583257],"about_ca_topic_score_codex":0.0040888153,"about_ca_topic_score_gemma":0.0043904954,"teacher_disagreement_score":0.015137167,"about_ca_system_score_codex":0.0055865124,"about_ca_system_score_gemma":0.008165651,"threshold_uncertainty_score":0.042972565},"labels":[],"label_agreement":null},{"id":"W2143383694","doi":"10.5267/j.msl.2013.06.033","title":"An ABC analysis for power generation project","year":2013,"lang":"en","type":"article","venue":"Management Science Letters","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Power (physics); Operations management; Process management; Business; Engineering","score_opus":0.011514354845714806,"score_gpt":0.2277844279597255,"score_spread":0.2162700731140107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143383694","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43967244,0.0017528038,0.42537507,0.00078246644,0.00010198169,0.0003157124,0.0012971838,0.000493995,0.13020837],"genre_scores_gemma":[0.95510036,0.0005333074,0.036600497,0.0000380299,0.00001988248,0.00010420566,0.00038285978,0.000059823506,0.0071610655],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988997,0.00029081042,0.00006871782,0.000097765274,0.00055436837,0.000088550776],"domain_scores_gemma":[0.99751365,0.001110567,0.00019651095,0.00015495239,0.0009843499,0.000039893173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085552194,0.0003758877,0.0003310955,0.0035419585,0.0003108321,0.0012423085,0.00040342097,0.00046463293,0.008652894],"category_scores_gemma":[0.0060728407,0.00018701192,0.0005228641,0.0033128303,0.00039884905,0.000979625,0.00043636558,0.00043517773,0.0008675969],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016702595,0.000090833644,0.037436087,0.00037888394,0.000075768156,0.0008262129,0.00042058647,0.53794175,0.0033433265,0.17710562,0.0071145366,0.23509939],"study_design_scores_gemma":[0.000010925418,0.00007243888,0.014676801,0.00005091591,0.00004309522,0.0003292825,0.000300142,0.95452607,0.00087422354,0.019864382,0.009231387,0.000020422816],"about_ca_topic_score_codex":0.011060701,"about_ca_topic_score_gemma":0.0057439604,"teacher_disagreement_score":0.011060701,"about_ca_system_score_codex":0.001494226,"about_ca_system_score_gemma":0.00062193914,"threshold_uncertainty_score":0.028946817},"labels":[],"label_agreement":null},{"id":"W2143401283","doi":"","title":"Framework Of A Virtual Laboratory For Construction Project Management","year":2006,"lang":"en","type":"article","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Schedule; Project management; Computer science; Task (project management); Process (computing); Takeoff; Duration (music); Project planning; Project management triangle; Construction management; Systems engineering; Engineering management; Operations research; Construction engineering; Engineering; Civil engineering","score_opus":0.00545001794329291,"score_gpt":0.21901619818341764,"score_spread":0.21356618024012472,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143401283","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003208068,0.00026638436,0.9779951,0.00035291875,0.0001006395,0.0002779538,0.00007879061,0.0016647498,0.01605539],"genre_scores_gemma":[0.11813636,0.00043095514,0.8715889,0.00011124212,0.00010381175,0.0010478253,0.0003797372,0.000204416,0.007996688],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9954131,0.0022181752,0.0003266399,0.00051559776,0.0011460285,0.00038038485],"domain_scores_gemma":[0.9978091,0.0005849775,0.00022054354,0.0005625158,0.00031416665,0.0005087435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0050617247,0.00096888014,0.0009211172,0.0020273814,0.0015646904,0.0067920196,0.004057485,0.002016316,0.011015498],"category_scores_gemma":[0.004097107,0.0006629523,0.001216297,0.0011824883,0.002507954,0.004501787,0.0059197024,0.0016622641,0.0032015138],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017018018,0.0003116189,0.0010556328,0.00027978545,0.00007481686,0.000624767,0.001365061,0.08132788,0.004634619,0.77795535,0.006500124,0.12570012],"study_design_scores_gemma":[0.00017762255,0.000436896,0.00074038096,0.00047658948,0.000083261366,0.000805368,0.0007880236,0.3664848,0.004728058,0.28579342,0.33930153,0.0001840775],"about_ca_topic_score_codex":0.0029650552,"about_ca_topic_score_gemma":0.0018726278,"teacher_disagreement_score":0.011015498,"about_ca_system_score_codex":0.0020285,"about_ca_system_score_gemma":0.0037529315,"threshold_uncertainty_score":0.036850512},"labels":[],"label_agreement":null},{"id":"W2143561132","doi":"10.5555/2433508.2433913","title":"Advanced simulation of tower crane operation utilizing system dynamics modeling and lean principles","year":2010,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Tower crane; Swing; Tower; Process (computing); Computer science; Engineering; Simulation; Mechanical engineering; Civil engineering; Structural engineering","score_opus":0.02329628047343545,"score_gpt":0.24950429191002682,"score_spread":0.22620801143659136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143561132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46729937,0.00013367039,0.50529724,0.00022121637,0.00005063671,0.00021703883,0.0003711169,0.0010984354,0.025311295],"genre_scores_gemma":[0.9585875,0.00013294446,0.03760667,0.000014965328,0.0000060069383,0.00015251464,0.00016072342,0.00004084204,0.003297757],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998847,0.000035146542,0.000005855367,0.000012383641,0.000042583735,0.000019387156],"domain_scores_gemma":[0.99977285,0.00011845756,0.000020474045,0.000019810466,0.000047791484,0.000020568923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024408313,0.0005581851,0.00055253424,0.00034016656,0.00042955944,0.0006222267,0.0005456047,0.0008159641,0.003098141],"category_scores_gemma":[0.0005677216,0.00029318157,0.0005278871,0.00037988345,0.00043847127,0.00055888353,0.0005298768,0.0005862483,0.00023102158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016972801,0.00001692925,0.00037854092,0.000010799048,0.000004127629,0.000021618798,0.00002122262,0.99604046,0.0010357274,0.00083379657,0.000045281096,0.0015744579],"study_design_scores_gemma":[0.000006712723,0.000010397314,0.00007613519,0.0000014802408,0.0000013396669,0.0000035057305,0.000005850983,0.9993249,0.00024972507,0.00013956861,0.00017872936,0.0000017530315],"about_ca_topic_score_codex":0.023858309,"about_ca_topic_score_gemma":0.014652835,"teacher_disagreement_score":0.023858309,"about_ca_system_score_codex":0.0005506494,"about_ca_system_score_gemma":0.0011180856,"threshold_uncertainty_score":0.04743886},"labels":[],"label_agreement":null},{"id":"W2143679217","doi":"10.5555/1218112.1218481","title":"Sensitivity analysis of construction simulation using Cell-DEVS and microcyclone","year":2006,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Sensitivity (control systems); DEVS; Computer science; Visualization; Resource (disambiguation); Discrete event simulation; Modeling and simulation; Simulation modeling; Resource allocation; Space (punctuation); Distributed computing; Data visualization; Industrial engineering; Mathematical optimization; Data mining; Simulation; Engineering; Mathematics; Computer network","score_opus":0.014024211744141361,"score_gpt":0.2329424468883221,"score_spread":0.21891823514418074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2143679217","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.743891,0.00067030033,0.23314461,0.00047104098,0.00011011046,0.00022800299,0.00095620286,0.0005863701,0.01994233],"genre_scores_gemma":[0.98515075,0.000117629446,0.013811237,0.000026360965,0.000005543092,0.00009053122,0.00014587601,0.000033634453,0.000618399],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99870086,0.0007307163,0.000053703905,0.000084548315,0.0002915539,0.00013854522],"domain_scores_gemma":[0.9909738,0.007915754,0.00024038358,0.0003157066,0.00046640701,0.00008800933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002438822,0.00074745895,0.000856948,0.0013708972,0.00048297376,0.00080172904,0.00065097533,0.0009042826,0.0016785398],"category_scores_gemma":[0.0061507965,0.0004758216,0.0008203107,0.00111724,0.00064326334,0.0006336298,0.00093187526,0.0007559817,0.000095284624],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004991692,0.00001783805,0.00089651364,0.00002414743,0.00002097773,0.000027454213,0.000019451638,0.99446106,0.00044328254,0.0016199494,0.00007217717,0.0023471706],"study_design_scores_gemma":[0.0000036371125,0.000021013479,0.00029721533,0.000003136263,0.0000064847686,0.0000065727577,0.000012755642,0.99808514,0.00095009874,0.00041269066,0.0001944407,0.0000069104963],"about_ca_topic_score_codex":0.018732183,"about_ca_topic_score_gemma":0.008157718,"teacher_disagreement_score":0.018732183,"about_ca_system_score_codex":0.0015511748,"about_ca_system_score_gemma":0.0007321516,"threshold_uncertainty_score":0.037246287},"labels":[],"label_agreement":null},{"id":"W2144127793","doi":"10.1061/9780784412329.107","title":"A Hybrid Framework for Modeling Construction Operations Using Discrete Event Simulation and System Dynamics","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Discrete event simulation; Computer science; Identification (biology); System dynamics; Event (particle physics); Systems engineering; Simulation modeling; Interface (matter); Computation; Industrial engineering; Simulation; Engineering; Artificial intelligence","score_opus":0.055370316662297026,"score_gpt":0.35740741732702436,"score_spread":0.30203710066472733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144127793","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036948326,0.000079929225,0.993001,0.00005625515,0.000017119488,0.00006441755,0.00008445221,0.00019289885,0.0028092135],"genre_scores_gemma":[0.313964,0.000658951,0.68066025,0.000047031277,0.000033434782,0.0007412799,0.00045744076,0.000070886344,0.0033667414],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994411,0.00027850686,0.000039359962,0.00005996917,0.00014777682,0.000033397162],"domain_scores_gemma":[0.9994992,0.00030913923,0.000041632826,0.0000485141,0.000073205636,0.000028431356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009570473,0.0008269496,0.0006170698,0.0010894975,0.00042112241,0.0013711837,0.0013611328,0.0007740765,0.0026239268],"category_scores_gemma":[0.0012582031,0.00042827113,0.0011442984,0.00094316487,0.0005366481,0.0010980745,0.0009263486,0.0008305621,0.0003363855],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018013041,0.000042885316,0.0005667952,0.00006041331,0.000050077848,0.000055331624,0.000058471225,0.9227424,0.001028214,0.062162418,0.00026705625,0.012947757],"study_design_scores_gemma":[0.000008642705,0.000021977798,0.00009243305,0.000013079699,0.000010600206,0.000019082954,0.000018599223,0.9864781,0.00029849965,0.00971891,0.0033116739,0.000008407843],"about_ca_topic_score_codex":0.008616595,"about_ca_topic_score_gemma":0.008004936,"teacher_disagreement_score":0.008616595,"about_ca_system_score_codex":0.00085123413,"about_ca_system_score_gemma":0.0015243152,"threshold_uncertainty_score":0.017132878},"labels":[],"label_agreement":null},{"id":"W2144244610","doi":"10.1139/l2012-104","title":"Advanced formwork method integrated with a layout planning model for tall building construction","year":2012,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formwork; Heuristic; Table (database); Engineering; Construction engineering; Civil engineering; Computer science; Engineering drawing; Data mining; Artificial intelligence","score_opus":0.010227092181245371,"score_gpt":0.21702511137806912,"score_spread":0.20679801919682375,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144244610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032968635,0.000020375186,0.9946201,0.000021058702,0.00000906662,0.00003265436,0.000020530115,0.00017314003,0.0018062409],"genre_scores_gemma":[0.12366536,0.00013371964,0.872661,0.0000144053365,0.000008826506,0.00020768915,0.00011397011,0.00011240378,0.003082608],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995109,0.00014585184,0.000021693171,0.00006580054,0.00022792743,0.000027859203],"domain_scores_gemma":[0.999572,0.00018614644,0.00004385448,0.00008759399,0.00008711671,0.00002328803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005303288,0.0005823383,0.00044181774,0.00066389854,0.00035281564,0.0007732872,0.001030892,0.0005621334,0.0051631783],"category_scores_gemma":[0.0010596006,0.0005189642,0.00090275455,0.00078977935,0.0005910765,0.0009986983,0.00075102434,0.000633576,0.00084992894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003878229,0.000054551674,0.0006691506,0.000108318985,0.000016551372,0.00011614506,0.00020797971,0.8245901,0.0063478127,0.03308698,0.001283099,0.1334806],"study_design_scores_gemma":[0.0000085886595,0.000035198787,0.000169675,0.000011893461,0.0000074805525,0.0000707835,0.000034189252,0.9845206,0.0016721833,0.0072984872,0.006157477,0.000013332462],"about_ca_topic_score_codex":0.0049809795,"about_ca_topic_score_gemma":0.0070414464,"teacher_disagreement_score":0.0051631783,"about_ca_system_score_codex":0.0005846304,"about_ca_system_score_gemma":0.0014665875,"threshold_uncertainty_score":0.017272592},"labels":[],"label_agreement":null},{"id":"W2144433307","doi":"10.1016/s0926-5805(99)00002-3","title":"A development framework for data models for computer-integrated facilities management","year":2000,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":100,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Interoperability; Engineering management; Facility management; Data management; Architecture; Construction management; Computer science; Systems engineering; Engineering; Data sharing; Software engineering; Database; Business; World Wide Web","score_opus":0.030962210141640918,"score_gpt":0.24504336583325712,"score_spread":0.2140811556916162,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144433307","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00053751253,0.000079639794,0.99360645,0.00013888752,0.00003661686,0.00014820427,0.000429003,0.003953388,0.0010702618],"genre_scores_gemma":[0.020471903,0.0003374253,0.97267514,0.00012311885,0.000029320647,0.000497068,0.0030645072,0.0011549407,0.0016466052],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957151,0.0008261047,0.000825148,0.00045750124,0.0019147833,0.000261373],"domain_scores_gemma":[0.99519145,0.0013539563,0.0002734132,0.0014600663,0.0014483159,0.0002728277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075730043,0.0014845902,0.0015504498,0.0029472795,0.0015879172,0.0074859075,0.005668072,0.002280414,0.0053178696],"category_scores_gemma":[0.011492635,0.0021129167,0.0034657759,0.003189865,0.0014488223,0.0062269312,0.004298194,0.0043846047,0.0031780377],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014448474,0.00026404468,0.0017318677,0.00087230565,0.00030581089,0.00064537884,0.0012557561,0.11418962,0.005629489,0.61524844,0.034102924,0.22560994],"study_design_scores_gemma":[0.000076122684,0.000083905215,0.00034958276,0.00046537325,0.00021670737,0.00045850995,0.00022856751,0.51682806,0.011612178,0.17667793,0.29287878,0.00012430936],"about_ca_topic_score_codex":0.012665068,"about_ca_topic_score_gemma":0.015941465,"teacher_disagreement_score":0.012665068,"about_ca_system_score_codex":0.0021144946,"about_ca_system_score_gemma":0.004586704,"threshold_uncertainty_score":0.040050387},"labels":[],"label_agreement":null},{"id":"W2144574033","doi":"10.1061/9780784413517.148","title":"Spatially Constrained Scheduling with Multidirectional Singularity Functions","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Singularity; Workspace; Scheduling (production processes); Computer science; Mathematical optimization; Schedule; Dimension (graph theory); Gravitational singularity; Mathematics; Artificial intelligence; Geometry; Mathematical analysis","score_opus":0.020237187328199683,"score_gpt":0.2708542371218359,"score_spread":0.2506170497936362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2144574033","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02566144,0.000054593802,0.9698183,0.000048795802,0.000024028364,0.000047256235,0.000037535512,0.00015221075,0.0041557937],"genre_scores_gemma":[0.533662,0.00024461022,0.45984504,0.000034166027,0.000023986564,0.00017553323,0.00015072945,0.00016503256,0.0056988904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997031,0.00008627418,0.000019938172,0.000049569557,0.00009392476,0.00004715386],"domain_scores_gemma":[0.9997048,0.000119535594,0.000045026365,0.00004030398,0.0000612164,0.000029087068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005467992,0.00076121953,0.00052700524,0.00051020854,0.00040036102,0.0007393136,0.00070855464,0.00042981323,0.0025153414],"category_scores_gemma":[0.0012749217,0.0003357252,0.0006930233,0.00073529244,0.0006401534,0.000873975,0.0011420203,0.00063764566,0.0004622635],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059633167,0.00004539045,0.0003647954,0.000051774332,0.000011055671,0.00011585387,0.00012971196,0.88282365,0.0039912337,0.070080824,0.0005707985,0.041755278],"study_design_scores_gemma":[0.000009526317,0.000033856028,0.000083108454,0.0000052321125,0.0000036841552,0.000023280716,0.000026507258,0.9806804,0.0012170225,0.01623102,0.0016779277,0.0000083148925],"about_ca_topic_score_codex":0.004117515,"about_ca_topic_score_gemma":0.003388928,"teacher_disagreement_score":0.004117515,"about_ca_system_score_codex":0.0008739812,"about_ca_system_score_gemma":0.0014334236,"threshold_uncertainty_score":0.008414686},"labels":[],"label_agreement":null},{"id":"W2145109616","doi":"10.1061/(asce)cp.1943-5487.0000199","title":"Automated Real-Time Monitoring System to Measure Shift Production of Tunnel Construction Projects","year":2012,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Calgary","funders":"","keywords":"Productivity; Measure (data warehouse); Interface (matter); Production (economics); Plan (archaeology); Computer science; User interface; Management system; Construction management; Real-time computing; Engineering; Database; Civil engineering; Operations management","score_opus":0.010468377703278884,"score_gpt":0.2132118205383111,"score_spread":0.2027434428350322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145109616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23798098,0.00023586636,0.71930665,0.00012579204,0.000099834106,0.00033114996,0.0011082486,0.035969477,0.0048420825],"genre_scores_gemma":[0.8190092,0.00011750237,0.17698528,0.00005529751,0.000056141213,0.00033556574,0.0009391198,0.00016873,0.002333212],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9994729,0.000102668746,0.000032717904,0.00014725677,0.00020496274,0.00003945374],"domain_scores_gemma":[0.9989543,0.00023553158,0.00018255142,0.0001662427,0.00038794026,0.00007335262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055849616,0.00046774495,0.0005702233,0.0019210269,0.00026937615,0.0005947633,0.00086344784,0.00043093055,0.002681098],"category_scores_gemma":[0.0011905018,0.00024979538,0.00017585336,0.0011084033,0.00018462412,0.0005553542,0.00045283095,0.00025367827,0.00081991614],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013457397,0.00067091006,0.031156158,0.0003853142,0.00014214718,0.00036645052,0.00065738877,0.045271933,0.12903261,0.002206005,0.01653514,0.7722302],"study_design_scores_gemma":[0.0002257367,0.0006537193,0.068299726,0.00006256931,0.00014474428,0.000656077,0.00028284878,0.8127306,0.09891675,0.001382768,0.01651359,0.00013090593],"about_ca_topic_score_codex":0.0014961524,"about_ca_topic_score_gemma":0.0014128098,"teacher_disagreement_score":0.002681098,"about_ca_system_score_codex":0.0004110975,"about_ca_system_score_gemma":0.00053209485,"threshold_uncertainty_score":0.008969188},"labels":[],"label_agreement":null},{"id":"W2145294919","doi":"","title":"Integrating Decision Support System (DSS) and Building Information Modeling (BIM) to Optimize the Selection of Sustainable Building Components","year":2015,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":75,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Multiple-criteria decision analysis; Decision support system; Sustainability; Conceptual design; TOPSIS; Engineering; Systems engineering; Sustainable design; Building design; Integrated design; Computer science; Risk analysis (engineering); Management science; Process management; Construction engineering; Architectural engineering; Operations research; Operations management; Civil engineering; Business; Scheduling (production processes)","score_opus":0.0072608382084449336,"score_gpt":0.216921002667138,"score_spread":0.20966016445869307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145294919","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059964534,0.00072638755,0.9265046,0.0007634942,0.0000892218,0.0005923936,0.00043790834,0.00095273444,0.009968697],"genre_scores_gemma":[0.3767009,0.0009656403,0.6196845,0.0001494436,0.0000396847,0.00051740214,0.0005809968,0.000046576988,0.001314812],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99695814,0.0013012725,0.00029370852,0.0002000526,0.0010898638,0.0001570812],"domain_scores_gemma":[0.9978606,0.0011739804,0.00024311928,0.00015761916,0.0004680173,0.000096689386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004085048,0.001085436,0.0010550809,0.0036295557,0.0006999439,0.0026823566,0.0010994944,0.0009539829,0.001697235],"category_scores_gemma":[0.0042476594,0.00053205504,0.0008467012,0.003905632,0.00045092017,0.0025307576,0.0019288219,0.001004713,0.00041536367],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031947216,0.00068077235,0.00580001,0.0011903634,0.00026707017,0.00042416542,0.0006962704,0.4647443,0.016401552,0.033132855,0.0040185153,0.47232473],"study_design_scores_gemma":[0.00008099325,0.00040141857,0.0022132506,0.0002162058,0.00014877146,0.00013404542,0.0006946208,0.94393367,0.011559455,0.022678014,0.017840946,0.000098665034],"about_ca_topic_score_codex":0.0017743373,"about_ca_topic_score_gemma":0.002411635,"teacher_disagreement_score":0.004085048,"about_ca_system_score_codex":0.0010030736,"about_ca_system_score_gemma":0.0022743747,"threshold_uncertainty_score":0.021604061},"labels":[],"label_agreement":null},{"id":"W2145599564","doi":"10.1109/iis.1997.645279","title":"Development of an object oriented framework for the simulation of earth moving operations","year":2002,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Graphical user interface; Object-oriented programming; Interface (matter); Object (grammar); Object-oriented modeling; Systems engineering; Visualization; Human–computer interaction; Software engineering; Engineering; Programming language; Artificial intelligence; Operating system","score_opus":0.019160052085981618,"score_gpt":0.2431395510051827,"score_spread":0.22397949891920108,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145599564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002187861,0.000084853455,0.99361694,0.00006609402,0.000048162354,0.00023508737,0.00008800371,0.0021658018,0.0015071916],"genre_scores_gemma":[0.02110269,0.00029685732,0.97589296,0.00005576145,0.000018109138,0.00041877208,0.00047778361,0.0004022931,0.0013346953],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988192,0.00023661047,0.00012491942,0.000109128654,0.0006024086,0.00010780174],"domain_scores_gemma":[0.99917394,0.00023545625,0.000057159035,0.000116881885,0.00030043657,0.00011617288],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003166929,0.0010555775,0.000917999,0.0011700965,0.0010528383,0.0026384539,0.0030693756,0.0014163805,0.0022086482],"category_scores_gemma":[0.0030272664,0.001084978,0.0018511342,0.00093165686,0.00078052364,0.0018215005,0.0013810437,0.0024547894,0.0010562637],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016396138,0.000404084,0.0030499839,0.00070971384,0.00020851147,0.0010270403,0.0014859092,0.50762177,0.017281275,0.23617917,0.010036571,0.22183199],"study_design_scores_gemma":[0.00013222656,0.00012858098,0.0006049776,0.00036564816,0.000107714215,0.00038080176,0.00014432461,0.7894029,0.009965078,0.037476216,0.1611569,0.00013462224],"about_ca_topic_score_codex":0.014270144,"about_ca_topic_score_gemma":0.011034824,"teacher_disagreement_score":0.014270144,"about_ca_system_score_codex":0.001264139,"about_ca_system_score_gemma":0.004611467,"threshold_uncertainty_score":0.028374195},"labels":[],"label_agreement":null},{"id":"W2145704802","doi":"10.1061/9780784412329.130","title":"Integrating Building Information Modeling with Universal Design Requirements for Highly Accessible Homes","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Adaptability; Universal design; Computer science; Process (computing); Population; Architectural engineering; Built environment; Systems engineering; Design process; Software engineering; Engineering; World Wide Web; Work in process; Civil engineering; Operations management","score_opus":0.0717595086824617,"score_gpt":0.3276354536967646,"score_spread":0.2558759450143029,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2145704802","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04422742,0.00022171368,0.9176585,0.0009041813,0.000036215002,0.00030590943,0.00043705132,0.0010955886,0.035113476],"genre_scores_gemma":[0.40415677,0.00043071603,0.5889087,0.000096545766,0.0000141143,0.000340951,0.0010309545,0.00016719248,0.0048540933],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970642,0.0008786602,0.0002908125,0.00022823848,0.0013121448,0.00022604738],"domain_scores_gemma":[0.9983834,0.0006485727,0.00015822295,0.00030521813,0.00043224037,0.000072366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024895496,0.0005870535,0.000470418,0.0014244668,0.00096674374,0.0040242053,0.0017092525,0.0011053465,0.0023489334],"category_scores_gemma":[0.004246228,0.0006204909,0.0009094064,0.0014746723,0.0011142131,0.0034088986,0.0022074338,0.00074035284,0.00054838747],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000088002205,0.00019025723,0.0054256725,0.00046927726,0.000041714207,0.0012678755,0.004671458,0.27885583,0.009863518,0.579239,0.005800667,0.114086784],"study_design_scores_gemma":[0.000029939893,0.00010119074,0.0024436652,0.0004246591,0.00008987448,0.0011743483,0.0033288023,0.6929277,0.013812526,0.10678456,0.17879614,0.00008646343],"about_ca_topic_score_codex":0.010165636,"about_ca_topic_score_gemma":0.014691894,"teacher_disagreement_score":0.010165636,"about_ca_system_score_codex":0.001726722,"about_ca_system_score_gemma":0.00227077,"threshold_uncertainty_score":0.020212948},"labels":[],"label_agreement":null},{"id":"W2146323859","doi":"10.1061/40794(179)18","title":"From Architectural Sketch to Feasible Structural System Solution","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University; Hôpital Notre-Dame","funders":"","keywords":"Sketch; Process (computing); Conceptual design; Architectural design; Computer science; Engineering design process; Software engineering; Architectural engineering; Architecture; Engineering; Systems engineering; Human–computer interaction; Mechanical engineering; Programming language","score_opus":0.006980508684538688,"score_gpt":0.20373259911387478,"score_spread":0.19675209042933609,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2146323859","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03618065,0.001613933,0.8879584,0.0027813169,0.00027967704,0.00029221093,0.0010824449,0.0030894475,0.06672186],"genre_scores_gemma":[0.37741983,0.0027655722,0.6019915,0.0002073038,0.00006548959,0.00028007283,0.001389037,0.0007094054,0.015171832],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981718,0.0007001451,0.00013354274,0.00025094175,0.00066794234,0.00007571294],"domain_scores_gemma":[0.9941572,0.0036431416,0.00029075408,0.0011095066,0.00064464856,0.0001548234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002195016,0.0009945452,0.00049048767,0.0015486681,0.00094894134,0.0057449494,0.0014764548,0.0018822368,0.043308053],"category_scores_gemma":[0.020933282,0.0011318986,0.00066268985,0.00089624693,0.0031151224,0.007220862,0.0047407406,0.0021607473,0.0045741987],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031419293,0.000065335684,0.0011470112,0.0014265999,0.000039895393,0.00089338527,0.004012841,0.09252204,0.01138913,0.69250137,0.012246155,0.18344209],"study_design_scores_gemma":[0.00015231528,0.00023863994,0.0012667861,0.0007763558,0.00006703423,0.0009019371,0.0040920135,0.22881067,0.013340344,0.57989573,0.1703209,0.00013734122],"about_ca_topic_score_codex":0.001833628,"about_ca_topic_score_gemma":0.0026238968,"teacher_disagreement_score":0.043308053,"about_ca_system_score_codex":0.0010424893,"about_ca_system_score_gemma":0.0014069002,"threshold_uncertainty_score":0.14487988},"labels":[],"label_agreement":null},{"id":"W2151848589","doi":"10.1139/l09-026","title":"A novel solution for construction on-site communication – the information booth","year":2009,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of Calgary","funders":"University of Calgary","keywords":"Unavailability; Productivity; Construction management; Information and Communications Technology; Information technology; Engineering; Engineering management; Computer science; Construction engineering; Transport engineering; Civil engineering; Reliability engineering; World Wide Web","score_opus":0.006703936349958971,"score_gpt":0.17273312767731944,"score_spread":0.16602919132736046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2151848589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16560304,0.0008585843,0.75876796,0.005409988,0.00093530427,0.0021736824,0.0003022855,0.0032079618,0.0627411],"genre_scores_gemma":[0.42913964,0.00046491658,0.554016,0.00081445737,0.0003199319,0.0020029184,0.0002746856,0.00016470444,0.012802764],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9940194,0.0031124572,0.00033320903,0.0005933191,0.0014762242,0.00046539272],"domain_scores_gemma":[0.98955077,0.005689064,0.00095049554,0.0020790987,0.0012595719,0.00047087233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004424062,0.00075828226,0.0005004692,0.0021358551,0.0012243481,0.003014336,0.0017030647,0.0018253982,0.0078070704],"category_scores_gemma":[0.010387182,0.00040008425,0.0004719626,0.0020280173,0.0018257023,0.0053053033,0.0036738263,0.0015211651,0.0017827385],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004806844,0.0014116599,0.0075584524,0.0014147718,0.00007587174,0.0006481171,0.011811305,0.0017429825,0.03962971,0.09548051,0.015087553,0.82465845],"study_design_scores_gemma":[0.0008645908,0.009582578,0.0350795,0.0020501225,0.00044541713,0.006585124,0.029731268,0.04725953,0.0769714,0.10195031,0.68880504,0.0006750517],"about_ca_topic_score_codex":0.00033057632,"about_ca_topic_score_gemma":0.00043634354,"teacher_disagreement_score":0.0078070704,"about_ca_system_score_codex":0.0005046966,"about_ca_system_score_gemma":0.0015200842,"threshold_uncertainty_score":0.026117265},"labels":[],"label_agreement":null},{"id":"W2152933467","doi":"10.1061/(asce)0733-9364(2005)131:3(360)","title":"Quantifying Engineering Project Scope for Productivity Modeling","year":2005,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scope (computer science); Rework; Work breakdown structure; Productivity; Computer science; Statement of work; Project management; Systems engineering; Estimation; Engineering management; Project planning; Engineering; Risk analysis (engineering); Management science; Project charter; Business","score_opus":0.018504629679681514,"score_gpt":0.22978327418486275,"score_spread":0.21127864450518125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2152933467","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07387789,0.00023793323,0.91678107,0.0001549759,0.000030821506,0.00019405957,0.0007622051,0.0003672527,0.0075938925],"genre_scores_gemma":[0.61470777,0.00030364067,0.3818389,0.0000348109,0.000018715155,0.00067018706,0.0013306701,0.00011097445,0.00098435],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9929242,0.0034219194,0.0005478359,0.00061081134,0.0022823121,0.00021294202],"domain_scores_gemma":[0.9836399,0.009842989,0.0015751313,0.0025697243,0.0021855233,0.00018671114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071166866,0.0008949238,0.0006004279,0.0054085106,0.0005802543,0.002514246,0.0009791221,0.0006471071,0.0021359895],"category_scores_gemma":[0.03617884,0.0004290303,0.0009351292,0.0045686327,0.0008999745,0.0038123582,0.002148065,0.00076925004,0.00039957062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015069105,0.0002529062,0.070883505,0.0005679552,0.00010621192,0.00012516863,0.0017610522,0.46312234,0.006920536,0.08812224,0.002481416,0.36550602],"study_design_scores_gemma":[0.000037185564,0.0003307282,0.04594696,0.00028772058,0.000040593583,0.00022449518,0.0012871668,0.8491447,0.0090040155,0.0729434,0.020596681,0.00015635714],"about_ca_topic_score_codex":0.0028473025,"about_ca_topic_score_gemma":0.0033052596,"teacher_disagreement_score":0.0071166866,"about_ca_system_score_codex":0.001757741,"about_ca_system_score_gemma":0.0015324216,"threshold_uncertainty_score":0.037637115},"labels":[],"label_agreement":null},{"id":"W2153602116","doi":"10.1061/9780784412329.114","title":"Assessing Productivity Improvement of Quick Connection Systems in the Steel Construction Industry Using Building Information Modeling (BIM)","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Productivity; Building information modeling; Schedule; Work (physics); Engineering; Construction industry; Computer science; Construction engineering; Manufacturing engineering; Mechanical engineering; Scheduling (production processes); Operations management","score_opus":0.08006876967882427,"score_gpt":0.34362589806443095,"score_spread":0.2635571283856067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2153602116","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9921051,0.000019659146,0.006547534,0.000016691998,0.0000018873654,0.000043085107,0.00007260845,0.00006057107,0.0011328245],"genre_scores_gemma":[0.98933053,0.00003775456,0.010065982,0.0000025734673,0.0000012465215,0.00003017284,0.00012242304,0.000011405484,0.00039787058],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9975745,0.0009800458,0.000105904204,0.00018083956,0.00097303867,0.0001856372],"domain_scores_gemma":[0.99676585,0.0013443151,0.000615841,0.00037395788,0.0007485352,0.00015143823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003079053,0.0005296796,0.00033730458,0.0017878846,0.00042533624,0.00090011343,0.00057925907,0.00045118912,0.0015050705],"category_scores_gemma":[0.00669593,0.00028040953,0.0003836846,0.0015943432,0.00031638955,0.0010084262,0.0009382734,0.00023702162,0.0002774304],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026143405,0.0017537078,0.2939981,0.00031977348,0.00014270948,0.0003018571,0.0018574694,0.22707501,0.047586396,0.001697667,0.0009262629,0.42172667],"study_design_scores_gemma":[0.000116039286,0.009449659,0.5330211,0.000044158995,0.00019239633,0.00020162962,0.0032069478,0.3995933,0.050055575,0.0013126191,0.0027248908,0.000081686594],"about_ca_topic_score_codex":0.004783335,"about_ca_topic_score_gemma":0.007090034,"teacher_disagreement_score":0.004783335,"about_ca_system_score_codex":0.0012950974,"about_ca_system_score_gemma":0.00093146873,"threshold_uncertainty_score":0.01628381},"labels":[],"label_agreement":null},{"id":"W2154572638","doi":"10.1139/cjce-2013-0192","title":"Analysis of rigging assembly for lifting heavy industrial modules","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; PCL Construction (Canada); University of Alberta","funders":"","keywords":"Engineering; Engineering drawing; Computer science","score_opus":0.011863337256502616,"score_gpt":0.1892268188010503,"score_spread":0.17736348154454767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2154572638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95369774,0.00030744745,0.027796831,0.000043353462,0.000025760039,0.00005415639,0.00046390938,0.0005325226,0.017078223],"genre_scores_gemma":[0.99108326,0.000070382805,0.00485991,0.000007036995,0.0000031348607,0.0000131051665,0.00039948095,0.00006721088,0.0034964131],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995845,0.00003946725,0.00001072939,0.000041114818,0.00022760122,0.00009664522],"domain_scores_gemma":[0.9994771,0.00017096156,0.000060807663,0.00005000986,0.00022155087,0.000019731195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005519294,0.0005961964,0.00036319706,0.0013380666,0.00043647582,0.0006581866,0.00058938883,0.0004988672,0.0058349604],"category_scores_gemma":[0.0009287099,0.00033597878,0.00078553904,0.0007392495,0.00033812347,0.00037069214,0.00024852587,0.00024616806,0.0012979462],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012340466,0.0002713444,0.029943202,0.00063174515,0.000075916745,0.0007212733,0.00032928315,0.7151075,0.149858,0.0045811147,0.002785882,0.09446068],"study_design_scores_gemma":[0.00001651051,0.00058867066,0.04815642,0.00002708352,0.000059624137,0.00015425023,0.00025711255,0.9139279,0.033324577,0.00049020245,0.0029651867,0.00003255976],"about_ca_topic_score_codex":0.007817442,"about_ca_topic_score_gemma":0.008543628,"teacher_disagreement_score":0.007817442,"about_ca_system_score_codex":0.0005628633,"about_ca_system_score_gemma":0.00051243836,"threshold_uncertainty_score":0.019519925},"labels":[],"label_agreement":null},{"id":"W2156011880","doi":"10.1139/cjce-2014-0313","title":"From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Animation; Lift (data mining); Modular programming; Computer science; Modular design; Process (computing); Engineering drawing; Computer animation; Computer graphics (images); Engineering; Operating system; Programming language","score_opus":0.03083602972281139,"score_gpt":0.24916137637725275,"score_spread":0.21832534665444137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156011880","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040057236,0.00007970269,0.9577048,0.0000928557,0.000059393813,0.00020998,0.00085905334,0.027449684,0.009538704],"genre_scores_gemma":[0.05826853,0.0004815151,0.91926396,0.00011445377,0.00002524393,0.0006150255,0.0024770878,0.008667566,0.010086678],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993789,0.00009275847,0.00004537744,0.00007273943,0.0003638555,0.000046371915],"domain_scores_gemma":[0.9990151,0.00045104753,0.00005128784,0.0001749037,0.00024865943,0.000058946094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011276256,0.0011561073,0.0005950913,0.0017499935,0.0005446998,0.0015365492,0.0022874495,0.00069394894,0.028456233],"category_scores_gemma":[0.0021046053,0.0010914977,0.0011354403,0.0007139722,0.0006412782,0.0010411022,0.0019401865,0.0013821226,0.004160128],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034124154,0.0003281883,0.00233704,0.0012495203,0.00012148106,0.0009691676,0.002743271,0.106622,0.0993099,0.058758892,0.09001855,0.6372008],"study_design_scores_gemma":[0.00013229196,0.00011430214,0.0017699506,0.00029967434,0.00007102158,0.0007641313,0.0003195653,0.4658168,0.08960304,0.01537399,0.4255669,0.00016831623],"about_ca_topic_score_codex":0.003787906,"about_ca_topic_score_gemma":0.006215131,"teacher_disagreement_score":0.028456233,"about_ca_system_score_codex":0.0007861328,"about_ca_system_score_gemma":0.0012746748,"threshold_uncertainty_score":0.09519559},"labels":[],"label_agreement":null},{"id":"W2156128289","doi":"10.1061/(asce)0742-597x(2004)20:1(25)","title":"In-House Delivery of Multiple-Small Reconstruction Projects","year":2003,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Public Health","funders":"","keywords":"Scope (computer science); Dilemma; Integrated project delivery; Outsourcing; Prioritization; Business; Operations management; Process management; Procurement; Engineering management; Risk analysis (engineering); Project management; Engineering; Marketing; Computer science; Systems engineering","score_opus":0.010534095056898223,"score_gpt":0.1843697805794448,"score_spread":0.17383568552254658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156128289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9903842,0.000032303047,0.0059514293,0.0000566116,0.0000070578512,0.00029050934,0.00007819064,0.00006482807,0.0031348343],"genre_scores_gemma":[0.9874821,0.00008353639,0.008546791,0.000015418542,0.0000059919253,0.00008920917,0.000098671466,0.000027144022,0.0036510816],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986265,0.0006732167,0.000059235303,0.00011622178,0.00029067238,0.00023408831],"domain_scores_gemma":[0.9960168,0.0017454857,0.0006547076,0.00047250724,0.0006303059,0.00048012397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015297113,0.0004158054,0.00034074739,0.0007467424,0.0012661881,0.0007719918,0.00088047964,0.000496083,0.0060340683],"category_scores_gemma":[0.004970813,0.00033096864,0.00024596913,0.00061711506,0.00038313217,0.00064828055,0.0010402239,0.00041659517,0.0007179015],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023895183,0.010416711,0.17669807,0.0012837211,0.00017299083,0.015322895,0.01865542,0.057536628,0.058137823,0.0043728175,0.006165256,0.6488482],"study_design_scores_gemma":[0.00057304447,0.028999949,0.54119813,0.00038501012,0.00030029332,0.014183555,0.07033746,0.1476713,0.10692089,0.0030206046,0.086155616,0.00025420898],"about_ca_topic_score_codex":0.004058661,"about_ca_topic_score_gemma":0.009944838,"teacher_disagreement_score":0.0060340683,"about_ca_system_score_codex":0.001330764,"about_ca_system_score_gemma":0.0013612432,"threshold_uncertainty_score":0.020186007},"labels":[],"label_agreement":null},{"id":"W2156344559","doi":"10.5555/2429759.2430112","title":"Simulation of mobile falsework utilization methods in bridge construction","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bridge (graph theory); Engineering; Construction engineering; Shoring; Construction management; Sequence (biology); Civil engineering; Computer science; Structural engineering","score_opus":0.06989636271862627,"score_gpt":0.3584415132555854,"score_spread":0.2885451505369591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156344559","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9212734,0.00013976247,0.063712135,0.00015389803,0.00003438337,0.00013548441,0.00030548134,0.000189178,0.014056303],"genre_scores_gemma":[0.98365146,0.000084698244,0.014475542,0.000012409657,0.0000026477783,0.0001232672,0.00011611199,0.000019874726,0.001513936],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99962544,0.00017360589,0.000018996845,0.000037114503,0.000068305824,0.00007657174],"domain_scores_gemma":[0.99820805,0.0013306685,0.00010613167,0.00010403623,0.0001316224,0.000119502314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078074646,0.0004947334,0.00054001674,0.0005918742,0.00052049075,0.0009151171,0.0010323352,0.0012557422,0.0030023356],"category_scores_gemma":[0.0018956601,0.00043569744,0.00061955693,0.0006160881,0.0007013297,0.0006810017,0.0009429987,0.0005899483,0.00023516003],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007798312,0.000064078864,0.0012529186,0.000017833694,0.0000064148107,0.000037533002,0.0000716704,0.9943271,0.0005674702,0.0016384248,0.00006819124,0.0018703324],"study_design_scores_gemma":[0.000021236383,0.00006153472,0.00030192817,0.000005333098,0.0000044042417,0.000007469523,0.0000462862,0.9984225,0.00044024823,0.00042389767,0.00025939618,0.0000058865503],"about_ca_topic_score_codex":0.01069273,"about_ca_topic_score_gemma":0.009744562,"teacher_disagreement_score":0.01069273,"about_ca_system_score_codex":0.0010195451,"about_ca_system_score_gemma":0.0010453869,"threshold_uncertainty_score":0.021260977},"labels":[],"label_agreement":null},{"id":"W2156710275","doi":"10.5555/1162708.1162978","title":"Representation and analysis of spatial resources in construction simulation","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Concordia University","funders":"","keywords":"Representation (politics); Computer science; Space (punctuation); Discrete event simulation; Productivity; Theoretical computer science; Industrial engineering; Data science; Simulation; Engineering","score_opus":0.018695832496966318,"score_gpt":0.26642566720633365,"score_spread":0.24772983470936732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156710275","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04786364,0.00013541718,0.94366837,0.00015377635,0.000023401348,0.00006084366,0.00012528786,0.00033008668,0.007639136],"genre_scores_gemma":[0.77700645,0.0003837518,0.21829684,0.000037187318,0.000015139601,0.00028980398,0.00030459723,0.00013527382,0.003531052],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928087,0.00030734428,0.000043244083,0.000054162127,0.00024523167,0.00006918264],"domain_scores_gemma":[0.9991359,0.00048083172,0.000065872206,0.00010728386,0.0001638902,0.000046273803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081153907,0.00046947878,0.00066870364,0.0008787564,0.00067086244,0.0017824874,0.0009936851,0.0008527198,0.0020005],"category_scores_gemma":[0.0026583564,0.00043015712,0.0006828178,0.0012336158,0.0009095191,0.0013148616,0.0014556202,0.0006240901,0.0003060974],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020837773,0.000012404343,0.0005419863,0.00001884607,0.000008295082,0.00003852015,0.00010790487,0.969354,0.0008848624,0.023703419,0.00014748944,0.0051614577],"study_design_scores_gemma":[0.000002898675,0.0000047736225,0.00008176828,0.000003876644,0.000003076303,0.000008624893,0.000028107635,0.9947838,0.00040421993,0.0037973023,0.00087716663,0.00000444788],"about_ca_topic_score_codex":0.016785592,"about_ca_topic_score_gemma":0.00922102,"teacher_disagreement_score":0.016785592,"about_ca_system_score_codex":0.001443395,"about_ca_system_score_gemma":0.0013064656,"threshold_uncertainty_score":0.0333758},"labels":[],"label_agreement":null},{"id":"W2156885087","doi":"10.1061/9780784412329.032","title":"Continuous Process Planning and Controlling Techniques for Construction Productivity Performance Enhancement","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Productivity; Mainstream; Documentation; Objectivity (philosophy); Process (computing); Accountability; Process management; Control (management); Knowledge management; Computer science; Engineering; Management science; Political science; Economics; Artificial intelligence","score_opus":0.031137011344921767,"score_gpt":0.32280438448980214,"score_spread":0.2916673731448804,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2156885087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0142556755,0.00059149606,0.9793244,0.000114689115,0.000021307125,0.00011310568,0.000023668093,0.00097054534,0.004585044],"genre_scores_gemma":[0.39347047,0.0009722069,0.6028278,0.00003712122,0.00002930504,0.0002251184,0.000080913196,0.00012721398,0.0022299],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981559,0.0005314802,0.00009817852,0.0003116134,0.00079606596,0.0001067671],"domain_scores_gemma":[0.9973109,0.0015132342,0.00040481862,0.00037543577,0.00034178077,0.000053830794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002594759,0.0008739304,0.00040978912,0.0018426498,0.00062856916,0.0019634191,0.0009835276,0.00044861634,0.0024269128],"category_scores_gemma":[0.003932298,0.000422188,0.0005554042,0.0020906047,0.0012155303,0.0015082612,0.0009920369,0.0010840151,0.00042059406],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025652166,0.00029680043,0.0025167468,0.0006665008,0.000048071008,0.00010572985,0.0015969566,0.059129804,0.049065877,0.043919977,0.0015982464,0.84079874],"study_design_scores_gemma":[0.0002946635,0.002689542,0.015216644,0.0006771068,0.0005052584,0.00077896874,0.002353937,0.59441274,0.2256254,0.069934875,0.08719815,0.00031271303],"about_ca_topic_score_codex":0.002648748,"about_ca_topic_score_gemma":0.0030846524,"teacher_disagreement_score":0.002648748,"about_ca_system_score_codex":0.0008346416,"about_ca_system_score_gemma":0.0022776243,"threshold_uncertainty_score":0.013722539},"labels":[],"label_agreement":null},{"id":"W2157566671","doi":"10.2118/141043-ms","title":"Implementing Craft Productivity to Improve Project Performance","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Nexen (Canada)","funders":"","keywords":"Productivity; Craft; Computer science; Geography; Economics","score_opus":0.018211384153464558,"score_gpt":0.2206185972517135,"score_spread":0.20240721309824894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157566671","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7388361,0.00067241344,0.16019322,0.0019253884,0.00013026841,0.0005299754,0.00009250444,0.0045740227,0.09304611],"genre_scores_gemma":[0.9355448,0.00023795401,0.057298124,0.00015883613,0.00003256631,0.00010494903,0.00009366962,0.00014872997,0.0063804504],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9918887,0.0030024755,0.00035729838,0.00050561305,0.0031689995,0.0010769276],"domain_scores_gemma":[0.9912828,0.0019825937,0.0014866552,0.0013056841,0.0029691579,0.0009730917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049645975,0.0008292071,0.00026484948,0.00122523,0.00069602433,0.0025927976,0.0011919389,0.00045191098,0.0063675307],"category_scores_gemma":[0.013250625,0.00026734333,0.00016955653,0.0010370269,0.0005509269,0.001534994,0.0023457254,0.00089060765,0.0010707475],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034496334,0.0020221614,0.023318848,0.00034539867,0.000045582063,0.00013227032,0.0015065884,0.021206172,0.015721375,0.0075104972,0.0072914227,0.9205549],"study_design_scores_gemma":[0.0008729909,0.013574871,0.33806726,0.0016749232,0.00041942604,0.0015968176,0.013422662,0.22214699,0.17924881,0.0266704,0.20202738,0.00027751835],"about_ca_topic_score_codex":0.0025148059,"about_ca_topic_score_gemma":0.0030134073,"teacher_disagreement_score":0.0063675307,"about_ca_system_score_codex":0.0018534501,"about_ca_system_score_gemma":0.003728931,"threshold_uncertainty_score":0.026255667},"labels":[],"label_agreement":null},{"id":"W2157838605","doi":"10.1155/2014/672896","title":"An Automated BIM Model to Conceptually Design, Analyze, Simulate, and Assess Sustainable Building Projects","year":2014,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":102,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Embodied energy; Sustainability; Energy consumption; Certification; Systems engineering; Environmental design; Energy modeling; Building design; Conceptual design; Sustainable design; Architectural engineering; Design tool; Computer science; Life-cycle assessment; Engineering; Civil engineering; Operations management; Production (economics); Human–computer interaction","score_opus":0.012402703447853028,"score_gpt":0.2478339491887843,"score_spread":0.23543124574093127,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157838605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016688144,0.000057938836,0.96034884,0.00015479262,0.00004431678,0.00021985534,0.0013470129,0.0032148685,0.017924279],"genre_scores_gemma":[0.33018976,0.00031534702,0.6542208,0.00008483913,0.000024549166,0.0012464392,0.00326814,0.0005384463,0.01011158],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995648,0.00010571138,0.00003329279,0.000051924475,0.00020045177,0.00004391544],"domain_scores_gemma":[0.9995801,0.00014368398,0.00004639076,0.000086856766,0.00011847132,0.000024547533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006914295,0.0006985911,0.00053332926,0.0012795122,0.0007236462,0.0016105842,0.0012835945,0.00091624,0.006238181],"category_scores_gemma":[0.001462545,0.0005548346,0.0009863221,0.0012184677,0.0003898004,0.0013935539,0.0010073646,0.0005730608,0.0019408291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041709864,0.00012293033,0.001966531,0.00007707596,0.000026677793,0.00011201264,0.0001265397,0.91027963,0.001968303,0.033265453,0.0036769304,0.04833626],"study_design_scores_gemma":[0.000011606369,0.000016855261,0.00038542273,0.000014925218,0.000012292931,0.000049168957,0.0000368767,0.9787476,0.0013169438,0.006512903,0.0128823845,0.000013094534],"about_ca_topic_score_codex":0.0074093128,"about_ca_topic_score_gemma":0.009573975,"teacher_disagreement_score":0.0074093128,"about_ca_system_score_codex":0.00093629974,"about_ca_system_score_gemma":0.0020084383,"threshold_uncertainty_score":0.020868838},"labels":[],"label_agreement":null},{"id":"W2157892415","doi":"","title":"CONVR2006 Visualizing Crane Selection and Operation in Virtual Environment","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Animation; Virtual machine; Virtual reality; Selection (genetic algorithm); Inverse kinematics; Kinematics; Computer animation; Human–computer interaction; Artificial intelligence; Robot; Computer graphics (images)","score_opus":0.00301493584589587,"score_gpt":0.1733729118679741,"score_spread":0.17035797602207822,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2157892415","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07561507,0.0002526641,0.886062,0.00021782043,0.00009060748,0.00011332742,0.00067672087,0.01580876,0.021163022],"genre_scores_gemma":[0.41351146,0.00042620252,0.5621163,0.00007346439,0.000028250775,0.00015155038,0.0013364349,0.0017590977,0.020597186],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976486,0.000073806725,0.000010459468,0.000030729043,0.00009556886,0.000024515572],"domain_scores_gemma":[0.99971884,0.00010520996,0.000019605066,0.000061590996,0.000052442618,0.000042200398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046829326,0.00069361704,0.0002747183,0.0009052796,0.0002082255,0.00091576605,0.00062975974,0.00052055396,0.012139517],"category_scores_gemma":[0.0008132496,0.0003042708,0.00038990963,0.000394216,0.00028782,0.00066631165,0.0008709946,0.000430014,0.0014427698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008143595,0.00045172052,0.0030895884,0.00070548797,0.00010917915,0.0012952245,0.0016271068,0.14341348,0.24355085,0.022995558,0.03819989,0.54374766],"study_design_scores_gemma":[0.00030124417,0.0004628074,0.009743473,0.00016972722,0.000080475125,0.0019056746,0.00054562005,0.70633245,0.11382198,0.0067590876,0.15970828,0.00016916776],"about_ca_topic_score_codex":0.0028198184,"about_ca_topic_score_gemma":0.0039825444,"teacher_disagreement_score":0.012139517,"about_ca_system_score_codex":0.00025446943,"about_ca_system_score_gemma":0.00044088086,"threshold_uncertainty_score":0.04061079},"labels":[],"label_agreement":null},{"id":"W2159071750","doi":"10.2165/00115677-200210020-00008","title":"The Development of a Tool to Assess Quality of Cost Estimates","year":2002,"lang":"en","type":"article","venue":"Disease Management & Health Outcomes","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute of Health Economics","funders":"Canadian Blood Services","keywords":"Medicine; Health care; Pharmacoeconomics; Quality (philosophy); Productivity; Unit (ring theory); Estimation; Cost estimate; Ambulatory care; Public health; Pharmacy; Unit cost; Nursing","score_opus":0.06470458835416765,"score_gpt":0.33681053797341665,"score_spread":0.272105949619249,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159071750","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":"evaluation","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":"evaluation","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05808267,0.0007458805,0.92239195,0.0011344211,0.0001697216,0.0011606268,0.003532163,0.0049420716,0.00784043],"genre_scores_gemma":[0.25652683,0.00031289656,0.73765576,0.00015537496,0.00006272539,0.001198834,0.0029121295,0.00022947323,0.0009459594],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.96154654,0.014602929,0.0061004423,0.0016150109,0.015619189,0.000515876],"domain_scores_gemma":[0.75965244,0.15325701,0.018147025,0.012068646,0.05540523,0.0014696649],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.04129568,0.0010702697,0.0015608483,0.014887261,0.00073781307,0.0063642096,0.0017409622,0.001480487,0.0038399966],"category_scores_gemma":[0.2017327,0.0005923324,0.0015040253,0.009361991,0.00058118225,0.0051025073,0.0026001995,0.001144559,0.0009269764],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005979051,0.0005480373,0.100682914,0.0007249881,0.00071797066,0.00012818028,0.00083573925,0.023307407,0.0022845257,0.018410452,0.010604,0.8411579],"study_design_scores_gemma":[0.00055382174,0.0018811865,0.14681897,0.0012190669,0.0012633653,0.0012370311,0.0018252735,0.72542953,0.023613308,0.046515953,0.049047697,0.0005947885],"about_ca_topic_score_codex":0.0053750738,"about_ca_topic_score_gemma":0.004463951,"teacher_disagreement_score":0.9587043,"about_ca_system_score_codex":0.0021964472,"about_ca_system_score_gemma":0.0032074982,"threshold_uncertainty_score":0.21839505},"labels":[],"label_agreement":null},{"id":"W2159096491","doi":"10.5539/mas.v2n6p41","title":"Effective Resources Management in Construction Industries for Success","year":2008,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Business; Profit (economics); Productivity; Control (management); Quality (philosophy); Product (mathematics); Environmental economics; Process (computing); Operations management; Computer science; Economics; Economic growth","score_opus":0.01009847185842623,"score_gpt":0.2095554180421051,"score_spread":0.19945694618367887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159096491","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043733977,0.011974766,0.2559917,0.047595438,0.00079276273,0.00037253398,0.0000902136,0.0006478769,0.6388008],"genre_scores_gemma":[0.7088826,0.008103533,0.17410545,0.0019244088,0.0004552587,0.00040230996,0.00012671288,0.00020216225,0.1057977],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9971635,0.0009752533,0.00013685638,0.000199014,0.0012125296,0.00031295474],"domain_scores_gemma":[0.9985038,0.00042382712,0.00020095312,0.00017245981,0.0003817958,0.00031712293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025798143,0.00049674,0.00031828496,0.0016193289,0.002917306,0.0069918605,0.0007808704,0.0012528899,0.009751963],"category_scores_gemma":[0.0034942015,0.0003196918,0.00020386929,0.0018418088,0.0039649266,0.00342114,0.00326556,0.0012646194,0.0025630484],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000210256,0.000119256576,0.0022179396,0.0003199529,0.00001188088,0.00029303462,0.003294008,0.0032528988,0.001804457,0.668358,0.032210033,0.28809747],"study_design_scores_gemma":[0.0000136835715,0.00009382584,0.0048802006,0.00056268263,0.000014319665,0.00040406347,0.008103673,0.004595133,0.001674133,0.5204997,0.45911393,0.000044610664],"about_ca_topic_score_codex":0.0016258036,"about_ca_topic_score_gemma":0.004765445,"teacher_disagreement_score":0.009751963,"about_ca_system_score_codex":0.0024834268,"about_ca_system_score_gemma":0.0076268166,"threshold_uncertainty_score":0.03262359},"labels":[],"label_agreement":null},{"id":"W2159421027","doi":"10.7492/ijaec.2013.008","title":"A Weather Generator for Use in Construction Simulation Models","year":2013,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Generator (circuit theory); Computer science; Meteorology; Environmental science; Geography; Physics; Power (physics)","score_opus":0.007503177386820845,"score_gpt":0.19802012193507604,"score_spread":0.19051694454825518,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159421027","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03267307,0.000063150605,0.93634206,0.00011281865,0.00008217952,0.0002666492,0.0017588153,0.016638635,0.012062663],"genre_scores_gemma":[0.5957854,0.00028188204,0.38745797,0.00005801165,0.00003192167,0.00071817666,0.002845012,0.0020459213,0.010775712],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997875,0.00005497433,0.000018765355,0.000037370726,0.00007412371,0.000027332402],"domain_scores_gemma":[0.9996227,0.00014617732,0.000025663176,0.000073473275,0.00010493642,0.000027021164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006636793,0.0005853516,0.00040811702,0.0005331313,0.00038879632,0.00066839013,0.0009670651,0.0005502879,0.008851781],"category_scores_gemma":[0.0015896972,0.0003942735,0.0004359658,0.00063879864,0.000330658,0.0007357996,0.0005847162,0.0007235887,0.0011494752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006945992,0.000043138472,0.0017059508,0.000086796164,0.000018625338,0.00013924793,0.00012660398,0.9386374,0.0057458924,0.017027114,0.003991771,0.032408062],"study_design_scores_gemma":[0.00001891919,0.000015224602,0.00027405002,0.000008313404,0.0000071568834,0.000028030488,0.000015504802,0.9824144,0.002625008,0.0024904483,0.012091476,0.000011413394],"about_ca_topic_score_codex":0.010549374,"about_ca_topic_score_gemma":0.008811412,"teacher_disagreement_score":0.010549374,"about_ca_system_score_codex":0.000666052,"about_ca_system_score_gemma":0.0012867992,"threshold_uncertainty_score":0.029612124},"labels":[],"label_agreement":null},{"id":"W2159559240","doi":"","title":"U.S. and Canada Railroads","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Feature (linguistics); Class (philosophy); Generalization; Set (abstract data type); Computer science; Base (topology); Artificial intelligence; Mathematics; Linguistics; Programming language","score_opus":0.004495868400710243,"score_gpt":0.14301556985293465,"score_spread":0.13851970145222442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2159559240","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01371683,0.0005949228,0.00095243356,0.0008427791,0.00020865459,0.000090184956,0.7994214,0.0010418756,0.183131],"genre_scores_gemma":[0.072412565,0.0014548422,0.0030128162,0.00041050214,0.000050247705,0.00014928951,0.78125316,0.00037558805,0.1408809],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986162,0.00004252103,0.000047478272,0.0001583166,0.00087344606,0.00026195962],"domain_scores_gemma":[0.9965402,0.000082394574,0.000113833514,0.00011899925,0.002930982,0.00021372117],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003770758,0.0010188862,0.00062337465,0.0064365254,0.0028124056,0.0026280694,0.0010898977,0.000511319,0.060213294],"category_scores_gemma":[0.0024896658,0.0003316512,0.00045647536,0.01910024,0.0004925179,0.00095595414,0.0009494048,0.000998831,0.021916043],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007050911,0.00002834814,0.015159044,0.00010639879,0.000022358812,0.00009696732,0.00020192695,0.000682704,0.00013004539,0.005500328,0.9448364,0.033164944],"study_design_scores_gemma":[0.00001662907,0.000011072976,0.044049036,0.0001081689,0.000014450177,0.000066550994,0.00088426017,0.0005869084,0.00033750615,0.00057197094,0.95331734,0.000036272904],"about_ca_topic_score_codex":0.97374535,"about_ca_topic_score_gemma":0.98743963,"teacher_disagreement_score":0.060213294,"about_ca_system_score_codex":0.012559506,"about_ca_system_score_gemma":0.02302328,"threshold_uncertainty_score":0.20143354},"labels":[],"label_agreement":null},{"id":"W2162237076","doi":"10.1061/9780784412329.011","title":"A Decision-Support Model Utilizing a Linear Cost Optimization Approach for Heavy Equipment Selection","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Earthworks; Visual Basic for Applications; Task (project management); Selection (genetic algorithm); Computer science; Operations research; Decision support system; Renting; Heavy equipment; Linear programming; Industrial engineering; Systems engineering; Engineering; Civil engineering; Data mining","score_opus":0.07869549746287131,"score_gpt":0.34664906066889806,"score_spread":0.26795356320602676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162237076","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0646778,0.00022015901,0.9184626,0.00067726045,0.00007871534,0.0002714847,0.00063039904,0.00066612556,0.014315457],"genre_scores_gemma":[0.8412794,0.00038117552,0.14224492,0.00016023552,0.000053817537,0.0011304743,0.0006549993,0.00011456584,0.013980416],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993356,0.00027635883,0.000034891327,0.00011111348,0.00013422235,0.000107745116],"domain_scores_gemma":[0.99891675,0.00070768874,0.00008004809,0.000026631918,0.0002104773,0.000058349528],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013170526,0.0010702652,0.0014241759,0.00090115133,0.0007889832,0.0025388678,0.0019631614,0.0021793575,0.008311171],"category_scores_gemma":[0.0021913366,0.0008765958,0.0010517641,0.0010544434,0.00057230133,0.0010682412,0.00096114643,0.001418539,0.00087982713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001896997,0.000019033576,0.00010930558,0.00001365462,0.000005793155,0.000023820076,0.000008858385,0.99644405,0.00008428682,0.0011394738,0.00015537723,0.0019774837],"study_design_scores_gemma":[0.0000046247474,0.0000082693,0.000020106372,0.0000017393869,0.0000026385744,0.0000025446218,0.0000043582636,0.9995523,0.000035408837,0.00026723367,0.00009894297,0.0000018819567],"about_ca_topic_score_codex":0.0272388,"about_ca_topic_score_gemma":0.0157439,"teacher_disagreement_score":0.0272388,"about_ca_system_score_codex":0.0019945768,"about_ca_system_score_gemma":0.0030163028,"threshold_uncertainty_score":0.054160476},"labels":[],"label_agreement":null},{"id":"W2162239134","doi":"10.1108/14714171111124149","title":"House construction CO<sub>2</sub> footprint quantification: a BIM approach","year":2011,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Carbon footprint; Greenhouse gas; Framing (construction); Building information modeling; Construction industry; Engineering; Architectural engineering; Process (computing); Originality; Civil engineering; Environmental science; Computer science; Construction engineering; Compatibility (geochemistry)","score_opus":0.03518559669408424,"score_gpt":0.2161228232726665,"score_spread":0.18093722657858224,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162239134","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09723882,0.00051305944,0.8561935,0.00034671696,0.00003752601,0.00027460366,0.0017469891,0.0020215637,0.041627184],"genre_scores_gemma":[0.58308816,0.0005899622,0.4114462,0.0000759112,0.000015354319,0.00028851232,0.0015248938,0.00024496176,0.0027260887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986206,0.00037496636,0.000048084246,0.00012333116,0.00074375723,0.00008919177],"domain_scores_gemma":[0.99932003,0.00016332089,0.00009135402,0.00014495975,0.00024792395,0.000032406213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009318579,0.0008193026,0.00066168356,0.0032355678,0.00054645044,0.0027709394,0.0010458087,0.0008861742,0.0024653173],"category_scores_gemma":[0.002046683,0.0005062314,0.00058521883,0.0034868359,0.00072781695,0.002056705,0.0016122804,0.0005633552,0.0008116343],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018382286,0.0003020466,0.02134894,0.0006174892,0.00020181175,0.00028633274,0.00057640695,0.50298834,0.016926577,0.055116117,0.005091919,0.39636016],"study_design_scores_gemma":[0.000014744158,0.000066911154,0.013252746,0.0001357786,0.00005926276,0.0003044748,0.0007413878,0.9249562,0.020664178,0.020731904,0.018993188,0.000079237165],"about_ca_topic_score_codex":0.004865025,"about_ca_topic_score_gemma":0.0053547,"teacher_disagreement_score":0.004865025,"about_ca_system_score_codex":0.0014226448,"about_ca_system_score_gemma":0.0011174467,"threshold_uncertainty_score":0.010322034},"labels":[],"label_agreement":null},{"id":"W2162271698","doi":"","title":"SAIT Polytechnic | Calgary AB | Timberframing at Sait","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Geography","score_opus":0.004180664526994387,"score_gpt":0.1699745760838083,"score_spread":0.16579391155681392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2162271698","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21593289,0.0039987024,0.0044166436,0.009912403,0.003267268,0.0003317237,0.0028891466,0.0019726877,0.75727856],"genre_scores_gemma":[0.118849255,0.0007492217,0.00377711,0.00037568415,0.00012107702,0.000062767765,0.0009079647,0.00049706263,0.87465984],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984231,0.00010715335,0.000026774673,0.00042371487,0.0005707985,0.00044840187],"domain_scores_gemma":[0.99916506,0.00006668707,0.00003748727,0.00006886946,0.00028344642,0.00037844843],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00086085795,0.001258794,0.00054604874,0.0014334524,0.007716006,0.0043398202,0.001020063,0.0025069139,0.2055034],"category_scores_gemma":[0.0009197942,0.0008236655,0.000571585,0.0012863054,0.0022212637,0.00085128244,0.0034860156,0.0028205065,0.06112439],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015876166,0.0013548462,0.027265053,0.000829894,0.000098945384,0.009594074,0.0060666017,0.007349338,0.04868402,0.027265975,0.3847883,0.48511535],"study_design_scores_gemma":[0.00006975592,0.00046966426,0.054805692,0.00032653796,0.000024733085,0.0012710103,0.0036629885,0.002093588,0.01244226,0.002010036,0.92273164,0.00009214898],"about_ca_topic_score_codex":0.09216044,"about_ca_topic_score_gemma":0.3248535,"teacher_disagreement_score":0.7944966,"about_ca_system_score_codex":0.0059578265,"about_ca_system_score_gemma":0.0091003105,"threshold_uncertainty_score":0.68747735},"labels":[],"label_agreement":null},{"id":"W2163340299","doi":"10.1139/l07-048","title":"Equipment workspace analysis in infrastructure projects","year":2007,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workspace; Bridge (graph theory); Computer science; Constructive; Key (lock); Representation (politics); Construction engineering; Flexibility (engineering); Risk analysis (engineering); Systems engineering; Engineering; Civil engineering; Robot; Process (computing); Business; Computer security; Artificial intelligence","score_opus":0.004661458230198203,"score_gpt":0.18176360873067757,"score_spread":0.17710215050047937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163340299","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2811116,0.00026466217,0.71192056,0.000045495904,0.0000067720885,0.00012236903,0.00020774423,0.00056773506,0.0057530184],"genre_scores_gemma":[0.7760585,0.00016952532,0.22239275,0.00000503775,0.0000031973032,0.000073048555,0.00026750492,0.00005921251,0.00097108237],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99930596,0.0002896287,0.00005250085,0.00010323199,0.00019495258,0.00005368287],"domain_scores_gemma":[0.9988287,0.0005637521,0.0002008744,0.00018004839,0.00018063522,0.000045989837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008345951,0.00038632646,0.00029972175,0.0019828284,0.00036865516,0.0009722618,0.0005711616,0.00039087873,0.001540196],"category_scores_gemma":[0.0032369492,0.00028638734,0.0004461548,0.0013281994,0.00056254555,0.0009909228,0.0014413656,0.00025118008,0.0002398302],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052405277,0.000113252514,0.034193248,0.0005817466,0.000064792024,0.001638735,0.0059049227,0.41782865,0.043038856,0.035599776,0.0015965849,0.45891538],"study_design_scores_gemma":[0.000039118604,0.000250342,0.029476775,0.00016396111,0.000050033457,0.0012338916,0.0032338183,0.9000452,0.03229134,0.021992492,0.011148431,0.000074542026],"about_ca_topic_score_codex":0.0029848022,"about_ca_topic_score_gemma":0.0027450246,"teacher_disagreement_score":0.0029848022,"about_ca_system_score_codex":0.0003929126,"about_ca_system_score_gemma":0.0006000607,"threshold_uncertainty_score":0.0059348345},"labels":[],"label_agreement":null},{"id":"W2163787508","doi":"10.1139/l11-025","title":"Schematic cost estimating model for super tall buildings using a high-rise premium ratio","year":2011,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schematic; Cost estimate; Unit cost; Productivity; Cost database; Computer science; Industrial engineering; Engineering; Economics; Systems engineering; Mechanical engineering","score_opus":0.021321499207405045,"score_gpt":0.1958483158564268,"score_spread":0.17452681664902175,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163787508","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.154912,0.00037771306,0.82258046,0.00027793797,0.000035155546,0.00016565819,0.0003819909,0.00052325916,0.02074582],"genre_scores_gemma":[0.9471647,0.00038545686,0.044632554,0.000035091107,0.000013807821,0.00026291164,0.0002983327,0.00006129542,0.0071458956],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994961,0.00011664459,0.000027052005,0.00009704071,0.00018743175,0.00007570119],"domain_scores_gemma":[0.99940515,0.00027135055,0.00011172158,0.00003806758,0.00015030039,0.00002332626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007387833,0.00074782304,0.00054309424,0.00095764827,0.0004029701,0.0013066927,0.0018417904,0.0010551236,0.0042126426],"category_scores_gemma":[0.0015450286,0.00047059965,0.0011867185,0.0007870679,0.0003728477,0.0012964625,0.00064542104,0.0006823891,0.00042550964],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014397327,0.00001478216,0.0009624479,0.000021837579,0.0000056220147,0.00005868182,0.000018695298,0.99078923,0.0006389725,0.0029517685,0.00014679643,0.0043769144],"study_design_scores_gemma":[0.0000026823125,0.000012150114,0.00031708166,0.000002853276,0.000007094415,0.000018370232,0.000009295059,0.99865675,0.00018439449,0.00049404893,0.0002911884,0.000004151702],"about_ca_topic_score_codex":0.018714668,"about_ca_topic_score_gemma":0.009603931,"teacher_disagreement_score":0.018714668,"about_ca_system_score_codex":0.0013824248,"about_ca_system_score_gemma":0.0011682676,"threshold_uncertainty_score":0.037211478},"labels":[],"label_agreement":null},{"id":"W2163804292","doi":"10.1139/cjce-2014-0079","title":"Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Welding; Productivity; Schedule; Engineering; Computer science; Mechanical engineering","score_opus":0.019833775053201462,"score_gpt":0.25749811356283314,"score_spread":0.23766433850963167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2163804292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9971993,0.000013752078,0.000825734,0.000018518842,0.00000163517,0.000044508528,0.00015281151,0.000014684314,0.0017290763],"genre_scores_gemma":[0.9971199,0.000053273878,0.0019460886,0.0000031498307,0.0000010476887,0.000050461545,0.00013532546,0.0000056927706,0.0006850748],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902153,0.00044916812,0.000054653905,0.00008536473,0.00020541756,0.00018382492],"domain_scores_gemma":[0.99489504,0.0037274542,0.0004515578,0.00022882505,0.00050816097,0.00018895115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016316723,0.0005644371,0.00043522255,0.0015157126,0.000540686,0.0009808125,0.00087241665,0.0009134375,0.003056372],"category_scores_gemma":[0.003150921,0.0005180933,0.00064735353,0.0018832907,0.00050909247,0.0006754787,0.00053096836,0.0005390713,0.00031781406],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00083558273,0.0017722577,0.08533978,0.00020638402,0.000096562864,0.0008973047,0.0008625617,0.8779423,0.005108222,0.0016124599,0.00076902536,0.024557596],"study_design_scores_gemma":[0.00012840489,0.002262212,0.08263305,0.00003498437,0.00012798666,0.00018518082,0.002981472,0.90336055,0.0061097792,0.000542237,0.0015668608,0.00006726585],"about_ca_topic_score_codex":0.026972167,"about_ca_topic_score_gemma":0.031703185,"teacher_disagreement_score":0.026972167,"about_ca_system_score_codex":0.0026613441,"about_ca_system_score_gemma":0.0013780541,"threshold_uncertainty_score":0.053630352},"labels":[],"label_agreement":null},{"id":"W2164919587","doi":"","title":"Toronto Takes Off","year":2004,"lang":"en","type":"article","venue":"Civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Redevelopment; International airport; Terminal (telecommunication); Engineering; Transport engineering; Civil engineering; State (computer science); Architectural engineering; Computer science; Telecommunications","score_opus":0.004255881539214431,"score_gpt":0.17003143846295957,"score_spread":0.16577555692374513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2164919587","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024270716,0.0044720634,0.0003187385,0.020425098,0.019367002,0.00009413179,0.0047870832,0.0008110038,0.9472978],"genre_scores_gemma":[0.0028836916,0.00067771185,0.00008489154,0.0010801795,0.00035215804,0.000008848263,0.0007078979,0.0001274762,0.9940771],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994141,0.000022543574,0.000015464522,0.00008716627,0.0002784972,0.0001822238],"domain_scores_gemma":[0.9987012,0.0000310549,0.00001896871,0.000074613155,0.00039600002,0.00077823544],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0004285435,0.00080299325,0.0005076182,0.0007727407,0.004967847,0.0053997273,0.0005733737,0.0020676248,0.56994647],"category_scores_gemma":[0.0009608512,0.00034479107,0.0004532959,0.0008237958,0.00088072586,0.001341634,0.0023856745,0.0021133157,0.19088055],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031317653,0.000007965232,0.00019907538,0.000041750995,0.0000030294636,0.00016609197,0.00011179861,0.000028790979,0.00020574131,0.0033724266,0.98217803,0.013653874],"study_design_scores_gemma":[0.000001844788,0.000004235713,0.00042311082,0.00001301438,0.0000010057994,0.000017828186,0.00010316692,0.000006116068,0.00002929621,0.000093215545,0.9993049,0.0000022347836],"about_ca_topic_score_codex":0.29729995,"about_ca_topic_score_gemma":0.6885,"teacher_disagreement_score":0.7027,"about_ca_system_score_codex":0.0071117184,"about_ca_system_score_gemma":0.010378456,"threshold_uncertainty_score":0.6134192},"labels":[],"label_agreement":null},{"id":"W2165255956","doi":"10.1139/l06-022","title":"Factors affecting buildability of building designs","year":2006,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Respondent; Key (lock); Engineering; Construction engineering; Sustainable development; Questionnaire; Linear discriminant analysis; Risk analysis (engineering); Transport engineering; Computer science; Business; Mathematics; Artificial intelligence; Statistics","score_opus":0.011818510156577556,"score_gpt":0.18676635050816787,"score_spread":0.1749478403515903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2165255956","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96733886,0.00017618084,0.02052313,0.00011626277,0.000010563544,0.00020492547,0.00014123046,0.00008895561,0.011399807],"genre_scores_gemma":[0.99506927,0.000032807762,0.004345767,0.000005156202,0.00000313396,0.00003798736,0.00008706454,0.000010161219,0.00040868568],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9920636,0.0023982238,0.0007335559,0.00036541474,0.0040530995,0.00038600844],"domain_scores_gemma":[0.9450554,0.036429837,0.007140138,0.0029106073,0.0077678505,0.00069606863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005814673,0.00046266,0.00022148967,0.0024293906,0.00055554265,0.0014702716,0.00027461906,0.00033745595,0.0024897002],"category_scores_gemma":[0.0637594,0.00021570228,0.0004440634,0.001365885,0.0010575656,0.001222911,0.0008950121,0.000449553,0.00029749237],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006068545,0.00030838238,0.6424047,0.0007535869,0.00017629832,0.00042094119,0.015322646,0.012017411,0.024933793,0.0067058075,0.00088794867,0.2954617],"study_design_scores_gemma":[0.000024338107,0.00056964136,0.96199906,0.000119918994,0.00007808981,0.00058664434,0.0065958193,0.009418401,0.008622513,0.0057509383,0.0061570923,0.00007755959],"about_ca_topic_score_codex":0.00201669,"about_ca_topic_score_gemma":0.0029940584,"teacher_disagreement_score":0.005814673,"about_ca_system_score_codex":0.0010485381,"about_ca_system_score_gemma":0.00084351073,"threshold_uncertainty_score":0.030751288},"labels":[],"label_agreement":null},{"id":"W2166536971","doi":"10.5555/1162708.1162971","title":"Modeling scheduling uncertainty in capital construction projects","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Scheduling (production processes); Monte Carlo method; Work (physics); Inflation (cosmology); Cost accounting; Operations research; Industrial engineering; Engineering; Economics; Operations management; Accounting","score_opus":0.025572965103551195,"score_gpt":0.24786615402994097,"score_spread":0.22229318892638977,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166536971","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49927476,0.00049466034,0.48528767,0.0006623815,0.0000661468,0.00010572649,0.00077475293,0.0003367889,0.012997036],"genre_scores_gemma":[0.9900478,0.00016545806,0.008360143,0.000016561095,0.000016989294,0.000048059377,0.00017370575,0.000027981292,0.0011431379],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989832,0.00047295596,0.000050531162,0.00014804491,0.00016649248,0.00017885304],"domain_scores_gemma":[0.9966286,0.0023870133,0.00047259146,0.000119300144,0.00020541078,0.00018699476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002179432,0.0006165871,0.00074899127,0.00073151174,0.00049994903,0.0017746886,0.0010050179,0.0011405858,0.001669762],"category_scores_gemma":[0.007896201,0.00071355834,0.0006790455,0.0012463067,0.0006387672,0.0012733077,0.00075554784,0.00082233344,0.00016526546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010991044,0.000004218949,0.00027998004,0.0000026387615,0.0000035039152,0.00001005561,0.000010978295,0.9973435,0.000030025287,0.0016956613,0.000035004832,0.00057352055],"study_design_scores_gemma":[0.0000039041593,0.000007893866,0.00017439049,0.0000022478105,0.000003724622,0.0000037460993,0.000009416318,0.9970921,0.000044302516,0.0025276637,0.0001271494,0.0000034216198],"about_ca_topic_score_codex":0.02742079,"about_ca_topic_score_gemma":0.014160559,"teacher_disagreement_score":0.02742079,"about_ca_system_score_codex":0.0026190323,"about_ca_system_score_gemma":0.0019055767,"threshold_uncertainty_score":0.054522336},"labels":[],"label_agreement":null},{"id":"W2166792774","doi":"10.1061/9780784412329.140","title":"Structural Steel Fabrication Special Purpose Simulation","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Set (abstract data type); Productivity; Computer science; Fabrication; Manufacturing engineering; Industrial engineering; Simulation modeling; Systems engineering; Process management; Engineering drawing; Engineering; Programming language","score_opus":0.05320733784896644,"score_gpt":0.3312695568173818,"score_spread":0.2780622189684154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2166792774","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03919992,0.0000872355,0.88203657,0.000219383,0.00016417901,0.0005164172,0.002801907,0.008196683,0.066777684],"genre_scores_gemma":[0.4595225,0.00040785372,0.48853293,0.00012607017,0.00003224106,0.0014356676,0.007336076,0.0018352666,0.040771395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993339,0.00016835675,0.00005412147,0.00006410367,0.0003096233,0.000069844486],"domain_scores_gemma":[0.9988011,0.0003419561,0.000069589434,0.0003471014,0.00037922413,0.000061059436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010171124,0.0005662002,0.0005854317,0.0006177497,0.00041900313,0.0010508923,0.0015680201,0.001119631,0.022966214],"category_scores_gemma":[0.0020314867,0.0004748357,0.001276629,0.00068815734,0.00047993887,0.00082199,0.0011113621,0.00075829995,0.0035319019],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024050262,0.00021894339,0.0044039264,0.0003940932,0.00006602182,0.0003867161,0.00056292274,0.8041032,0.019478248,0.06531878,0.018956114,0.08587056],"study_design_scores_gemma":[0.000052806157,0.00008566309,0.0009387838,0.00003335703,0.000016942207,0.00014032885,0.00007125198,0.9175221,0.010757467,0.005510387,0.064839706,0.000031126798],"about_ca_topic_score_codex":0.0049554547,"about_ca_topic_score_gemma":0.0045441743,"teacher_disagreement_score":0.022966214,"about_ca_system_score_codex":0.00073001167,"about_ca_system_score_gemma":0.0016680651,"threshold_uncertainty_score":0.07682961},"labels":[],"label_agreement":null},{"id":"W21669223","doi":"10.1016/j.jinf.2011.05.015","title":"A Layered Approach for Planning Releases under Uncertain Capacities.","year":2009,"lang":"en","type":"article","venue":"Software Engineering and Knowledge Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science","score_opus":0.01480296806451505,"score_gpt":0.21737391622697158,"score_spread":0.20257094816245652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W21669223","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071002827,0.0012375999,0.83045924,0.0219698,0.0006243865,0.0013277148,0.0012219776,0.0029136473,0.13314538],"genre_scores_gemma":[0.12844348,0.0018689256,0.8272033,0.0018167188,0.00021840341,0.0010782463,0.0017189245,0.0008108721,0.036841284],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9916114,0.0043370887,0.00053742714,0.0012695735,0.0014800724,0.0007644568],"domain_scores_gemma":[0.98888636,0.003958604,0.00085702457,0.0020894003,0.0026126995,0.0015959494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011357292,0.0020191032,0.0010905811,0.002850285,0.003139651,0.013055066,0.0057786815,0.0039833896,0.059821915],"category_scores_gemma":[0.023338128,0.0012752982,0.0021998347,0.0029003324,0.0036496366,0.011075873,0.011657399,0.0037822435,0.008761918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023362799,0.00023741959,0.0043910425,0.00071657903,0.00033095703,0.0018590644,0.003206345,0.13254544,0.0013544383,0.5319292,0.05908982,0.26410607],"study_design_scores_gemma":[0.000061825325,0.00017909058,0.0008603339,0.00078780996,0.00014285932,0.0006303409,0.006360564,0.13682052,0.0009565413,0.5791272,0.27391943,0.00015346738],"about_ca_topic_score_codex":0.012449167,"about_ca_topic_score_gemma":0.016049126,"teacher_disagreement_score":0.059821915,"about_ca_system_score_codex":0.0056744935,"about_ca_system_score_gemma":0.020310102,"threshold_uncertainty_score":0.20012426},"labels":[],"label_agreement":null},{"id":"W2167484719","doi":"10.1061/9780784412329.020","title":"A Framework for Construction Strategy Formulation and Visualization","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Adaptation (eye); Visualization; Plan (archaeology); Scheduling (production processes); Project management; Work (physics); Representation (politics); Management science; Project planning; Process management; Operations research; Systems engineering; Engineering; Artificial intelligence; Operations management","score_opus":0.063021331179069,"score_gpt":0.3706618633868529,"score_spread":0.3076405322077839,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167484719","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006944315,0.00038726573,0.9844787,0.00121127,0.000057561196,0.00019283261,0.00027122017,0.0009061626,0.011800574],"genre_scores_gemma":[0.022999179,0.00049754203,0.9729735,0.000088548746,0.000034457204,0.00050157175,0.00047062727,0.00015443235,0.0022800823],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99715,0.0014600713,0.00029150952,0.00032317484,0.00059200573,0.00018338537],"domain_scores_gemma":[0.9974722,0.0011250041,0.00018577403,0.00044152583,0.000558339,0.0002170885],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006063965,0.0019757252,0.0009329377,0.004610281,0.002141983,0.013052566,0.0041950867,0.0028408964,0.010643921],"category_scores_gemma":[0.007227445,0.0011116952,0.002376744,0.0035295514,0.0047055087,0.0067248875,0.0041486286,0.0030814824,0.0023406623],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016957034,0.000032932472,0.00023948497,0.00018822776,0.00001973166,0.00013590664,0.0017386405,0.01706019,0.00078521034,0.9314922,0.005662423,0.04262801],"study_design_scores_gemma":[0.000032076463,0.000036173424,0.00023608062,0.00051570626,0.000024954841,0.00020746901,0.001471855,0.11576912,0.00095399714,0.6604161,0.22027828,0.000058252557],"about_ca_topic_score_codex":0.014006089,"about_ca_topic_score_gemma":0.012218648,"teacher_disagreement_score":0.014006089,"about_ca_system_score_codex":0.004396645,"about_ca_system_score_gemma":0.0054614968,"threshold_uncertainty_score":0.035607517},"labels":[],"label_agreement":null},{"id":"W2167786059","doi":"10.1061/41109(373)37","title":"State-Based Simulation Mechanism for Facilitating Project Schedule Updating","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Schedule; Scheduling (production processes); Discrete event simulation; Project management; Industrial engineering; Process (computing); Operations research; Distributed computing; Systems engineering; Simulation; Engineering; Operations management","score_opus":0.015350360960934157,"score_gpt":0.25773890528645865,"score_spread":0.2423885443255245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167786059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012933848,0.000055699955,0.96468437,0.000111407295,0.00009654075,0.00013896658,0.00015897067,0.014376803,0.007443395],"genre_scores_gemma":[0.53146774,0.00025670076,0.4572206,0.00015786442,0.00009605884,0.0008026931,0.0006207178,0.0007277309,0.008649877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989925,0.00031517702,0.00014064733,0.00017657335,0.00029957696,0.00007548085],"domain_scores_gemma":[0.9968957,0.0014513038,0.00022405136,0.0008475834,0.00043297303,0.00014850101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018222304,0.000612782,0.00069521094,0.0014378497,0.0007447646,0.0015940602,0.0021152322,0.00091984635,0.009040557],"category_scores_gemma":[0.0050088894,0.00056326983,0.0006462732,0.0008504778,0.0007303641,0.0020094058,0.0016762464,0.0011484277,0.0014737739],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011563745,0.0006406981,0.004370659,0.00027922282,0.00017009085,0.0008676428,0.0019471871,0.4606679,0.03903775,0.26491505,0.011954656,0.21399266],"study_design_scores_gemma":[0.000113146234,0.00009676332,0.000307507,0.000026445776,0.000072073235,0.00011933267,0.000036439556,0.9308595,0.018085912,0.015433903,0.034789182,0.000059822247],"about_ca_topic_score_codex":0.002711084,"about_ca_topic_score_gemma":0.002693617,"teacher_disagreement_score":0.009040557,"about_ca_system_score_codex":0.0006898594,"about_ca_system_score_gemma":0.0014252912,"threshold_uncertainty_score":0.030243695},"labels":[],"label_agreement":null},{"id":"W2167981124","doi":"10.5555/2431518.2431936","title":"Integration of construction and traffic engineering in simulating pipe-jacking operations in urban areas","year":2011,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Jacking; Transport engineering; Plan (archaeology); Sizing; Engineering; Truck; Scheduling (production processes); Construction management; Traffic engineering; Civil engineering; Site plan; Urban planning; Regional planning; Operations management","score_opus":0.026096545429864074,"score_gpt":0.22615925140052237,"score_spread":0.20006270597065828,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2167981124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9687843,0.000032252803,0.02030372,0.00010485588,0.000017324888,0.000116455376,0.00017267281,0.00013289833,0.010335559],"genre_scores_gemma":[0.9916609,0.000054918048,0.0066605215,0.000010934477,0.0000027894687,0.000073402596,0.00008800872,0.000019072615,0.0014295073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997334,0.000114561175,0.000012166972,0.000023269853,0.000043313248,0.00007329706],"domain_scores_gemma":[0.9994894,0.00029148735,0.000045126617,0.000037190657,0.0000789948,0.00005777769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005400834,0.0005125109,0.00047362922,0.00047983273,0.0006689114,0.0009380056,0.00074196357,0.0009179596,0.0020551318],"category_scores_gemma":[0.0011034345,0.0005209451,0.00045747985,0.0008767166,0.00086527376,0.00060618174,0.000738921,0.0005424194,0.00018946415],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002363782,0.000041384857,0.0020633778,0.0000075944417,0.0000038330973,0.000032617205,0.000038130976,0.9961116,0.0003377491,0.0005458857,0.00003174101,0.00076262787],"study_design_scores_gemma":[0.000014725847,0.00003975084,0.0009408212,0.0000030564024,0.00000618995,0.000007047759,0.000100226905,0.9980724,0.0003997638,0.00016750404,0.00024180693,0.000006640657],"about_ca_topic_score_codex":0.087169856,"about_ca_topic_score_gemma":0.071917996,"teacher_disagreement_score":0.087169856,"about_ca_system_score_codex":0.0014961931,"about_ca_system_score_gemma":0.0021018353,"threshold_uncertainty_score":0.17332494},"labels":[],"label_agreement":null},{"id":"W2168057526","doi":"10.1017/s0890060403172034","title":"A feature ontology to support construction cost estimating","year":2003,"lang":"en","type":"article","venue":"Artificial intelligence for engineering design analysis and manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Computer science; Ontology; Feature (linguistics); Component (thermodynamics); Estimator; Product (mathematics); Similarity (geometry); Data mining; Artificial intelligence; Mathematics; Statistics","score_opus":0.025893494142698117,"score_gpt":0.25168374273809546,"score_spread":0.22579024859539734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168057526","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003389812,0.000070336464,0.9869401,0.0003469272,0.000031671458,0.00019913608,0.0016336252,0.0027858636,0.00460252],"genre_scores_gemma":[0.04697679,0.00023800401,0.9456157,0.00012573018,0.00002123284,0.00040141007,0.0043360083,0.0005322563,0.0017529052],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9970246,0.00047376181,0.00052564626,0.00044538794,0.0013576825,0.00017283908],"domain_scores_gemma":[0.99582565,0.0013362509,0.00042338605,0.0013530425,0.00090883084,0.00015283302],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003083651,0.0007778721,0.0007641187,0.0036411781,0.0012656485,0.0039274152,0.0030802728,0.0016726292,0.004034784],"category_scores_gemma":[0.010566435,0.0012116688,0.0024572203,0.003913595,0.0013670479,0.008589131,0.0028679618,0.0026313986,0.0011131888],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006801575,0.00023470772,0.0037581339,0.00043700676,0.00009625076,0.00044540418,0.0012700817,0.07837096,0.004665424,0.6781944,0.018672623,0.2137871],"study_design_scores_gemma":[0.00004679283,0.000059905353,0.0017503541,0.0004077614,0.00011204289,0.0007562214,0.00059056113,0.4456436,0.007325915,0.21809345,0.3250922,0.00012119542],"about_ca_topic_score_codex":0.01853742,"about_ca_topic_score_gemma":0.02538028,"teacher_disagreement_score":0.01853742,"about_ca_system_score_codex":0.003012846,"about_ca_system_score_gemma":0.0048213517,"threshold_uncertainty_score":0.036859035},"labels":[],"label_agreement":null},{"id":"W2168260347","doi":"10.2172/889402","title":"Process for Converting Waste Glass Fiber into Value Added Products, Final Report","year":2005,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Waste management; Tile; Pozzolan; Municipal solid waste; Glass recycling; Fiber; Glass fiber; Environmental science; Portland cement; Engineering; Cement; Materials science; Metallurgy; Composite material","score_opus":0.03099688200241368,"score_gpt":0.2825210563841249,"score_spread":0.2515241743817112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168260347","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5524138,0.0039420803,0.14437608,0.0051192218,0.0013596973,0.0056556775,0.009117523,0.00436909,0.27364686],"genre_scores_gemma":[0.6964022,0.0036601536,0.06778633,0.00048397566,0.00014408457,0.0011797899,0.0063873096,0.00046830598,0.22348782],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996933,0.000018106306,0.000011219197,0.00003382755,0.00019728491,0.00004643621],"domain_scores_gemma":[0.99989593,0.0000059533163,0.000014745059,0.00001373222,0.000050789477,0.000018823997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006393693,0.00040878053,0.00013772369,0.00042689813,0.00065998465,0.0007150089,0.0003275259,0.00049266085,0.010015414],"category_scores_gemma":[0.00031739954,0.00018720387,0.00025269095,0.0002771354,0.00021342328,0.0005874422,0.0005018433,0.0006708637,0.003275807],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006200001,0.00094059756,0.0019210253,0.00083532714,0.000022823686,0.00094169885,0.00039958302,0.0016672068,0.7102405,0.0043181167,0.054701325,0.22339176],"study_design_scores_gemma":[0.0001316683,0.0010144856,0.0066827387,0.00006982009,0.000025182042,0.0004665648,0.00025777312,0.0018521651,0.7639465,0.00068596995,0.22483759,0.000029571524],"about_ca_topic_score_codex":0.0043607196,"about_ca_topic_score_gemma":0.007064815,"teacher_disagreement_score":0.010015414,"about_ca_system_score_codex":0.00067906553,"about_ca_system_score_gemma":0.001657302,"threshold_uncertainty_score":0.033504963},"labels":[],"label_agreement":null},{"id":"W2168852977","doi":"10.1061/(asce)0733-9364(2002)128:5(438)","title":"Enhancing Project Evaluation and Review Technique Simulation through Artificial Neural Network-based Input Modeling","year":2002,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Artificial neural network; Computer science; Beta distribution; Probability distribution; Merge (version control); Sampling (signal processing); Artificial intelligence; Data mining; Statistics; Machine learning; Mathematics","score_opus":0.026660590404711422,"score_gpt":0.2570156965044356,"score_spread":0.2303551060997242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168852977","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13072056,0.00005341399,0.8631389,0.00016446158,0.000020794978,0.0001949191,0.00011131031,0.00063247996,0.004963157],"genre_scores_gemma":[0.8175995,0.0001107075,0.18056189,0.000037321497,0.000013627747,0.0003756252,0.00014532839,0.000046766974,0.0011092204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99684227,0.0019353197,0.00017850156,0.000217053,0.00072046596,0.00010641822],"domain_scores_gemma":[0.9915418,0.0052609956,0.00081414095,0.00053979945,0.0017602821,0.000083057785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040434105,0.0005598409,0.0005147829,0.0007419933,0.00029335494,0.001044465,0.00088454265,0.00047347954,0.0009920227],"category_scores_gemma":[0.017258784,0.0002871129,0.00037536523,0.00079446007,0.00028707896,0.0011294967,0.0005697097,0.0005008989,0.00017874567],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008929667,0.00009172149,0.004796565,0.00007814053,0.000032947795,0.000055818855,0.00015442123,0.9418415,0.0013646119,0.0035658546,0.00026823144,0.047660887],"study_design_scores_gemma":[0.000006862431,0.000034186698,0.0005579045,0.000007727693,0.0000068881654,0.000010574115,0.000014929522,0.9968125,0.0012112985,0.0010220458,0.00030853797,0.00000648811],"about_ca_topic_score_codex":0.0043372926,"about_ca_topic_score_gemma":0.0048050713,"teacher_disagreement_score":0.0043372926,"about_ca_system_score_codex":0.0012236516,"about_ca_system_score_gemma":0.001121113,"threshold_uncertainty_score":0.021383882},"labels":[],"label_agreement":null},{"id":"W2168920618","doi":"10.1109/icsmc.2006.384558","title":"Computational Intelligence Techniques for Building Transparent Construction Performance Models","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Artificial neural network; Cluster analysis; Transparency (behavior); Fuzzy logic; Data mining; Artificial intelligence; Data modeling; Machine learning; Computational intelligence; Genetic algorithm; Model building; Database","score_opus":0.018744125721664187,"score_gpt":0.23262362215500385,"score_spread":0.21387949643333964,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2168920618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029219966,0.000097413584,0.9952722,0.000100105586,0.000010146092,0.000017071583,0.000030261215,0.00013657559,0.0014141959],"genre_scores_gemma":[0.3506034,0.0008696022,0.6445745,0.00010045077,0.00006298626,0.00052052556,0.00031862984,0.00012182745,0.002828091],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903893,0.00037186255,0.00007107579,0.00012056661,0.0003447826,0.000052731968],"domain_scores_gemma":[0.99829715,0.0011428652,0.00019440078,0.00015945408,0.00018535103,0.000020845053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018199274,0.0010446969,0.0008360493,0.0013953395,0.00040388503,0.0014615572,0.001142935,0.0009154476,0.0015353946],"category_scores_gemma":[0.0067309192,0.0006089746,0.0011477252,0.0013724491,0.0008974339,0.0018370837,0.0013195424,0.001654718,0.00042601253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006948782,0.000010082456,0.00016982033,0.000032755943,0.00001749004,0.000033325217,0.000038058344,0.95225894,0.0003069532,0.032190364,0.00021433669,0.014720895],"study_design_scores_gemma":[0.0000015015945,0.0000033750998,0.000032439595,0.000005331983,0.0000026464218,0.0000059669605,0.000004521115,0.98476624,0.0000883307,0.014740758,0.0003461598,0.0000028240008],"about_ca_topic_score_codex":0.004241438,"about_ca_topic_score_gemma":0.0028478953,"teacher_disagreement_score":0.004241438,"about_ca_system_score_codex":0.0007971647,"about_ca_system_score_gemma":0.00086690445,"threshold_uncertainty_score":0.009624779},"labels":[],"label_agreement":null},{"id":"W2169010058","doi":"10.1061/9780784412329.085","title":"Activity-Based Data Fusion for Automated Progress Tracking of Construction Projects","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sensor fusion; Computer science; Scope (computer science); Systems engineering; Piping; Field (mathematics); Object (grammar); Identification (biology); Scalability; Engineering; Database; Artificial intelligence","score_opus":0.1224683887234326,"score_gpt":0.3809785777175685,"score_spread":0.2585101889941359,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169010058","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024179816,0.00020886048,0.9726562,0.000054717068,0.000038489416,0.000048748865,0.00025347818,0.0015990167,0.00096073677],"genre_scores_gemma":[0.64680755,0.0004645259,0.34993622,0.00004336269,0.00003532786,0.00018432051,0.0012912853,0.00009877112,0.0011387079],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99876887,0.00021271249,0.0001043539,0.00033373063,0.00048649366,0.00009388247],"domain_scores_gemma":[0.99883527,0.00027629134,0.00019025007,0.00024221111,0.00040379513,0.000052201398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016026687,0.0009791488,0.0013437606,0.0029656952,0.00045571124,0.001061752,0.0010310133,0.00069199776,0.00085310626],"category_scores_gemma":[0.0033720566,0.0005319648,0.00089154416,0.002879291,0.00041688618,0.0020135983,0.0013603106,0.000806663,0.0006611969],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042987507,0.00028629712,0.011016216,0.00028350943,0.00016124574,0.00018814376,0.0005170642,0.37020823,0.025387205,0.007217266,0.0022346184,0.58207023],"study_design_scores_gemma":[0.000011051634,0.00008671389,0.0042795744,0.00002676278,0.0000369758,0.00008978041,0.0001008619,0.9765474,0.012553155,0.0032260916,0.0030047833,0.000036809175],"about_ca_topic_score_codex":0.004271557,"about_ca_topic_score_gemma":0.0036353495,"teacher_disagreement_score":0.004271557,"about_ca_system_score_codex":0.00075850595,"about_ca_system_score_gemma":0.0007962688,"threshold_uncertainty_score":0.008493423},"labels":[],"label_agreement":null},{"id":"W2169101793","doi":"10.3141/1907-10","title":"Evaluation of Dowel Bars Installed in Airfield Concrete Pavement Construction Joints by Using Plastic Sleeves","year":2005,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Dowel; Structural engineering; Engineering; Drilling; Bar (unit); Consolidation (business); Installation; Geotechnical engineering; Forensic engineering; Mechanical engineering; Geology","score_opus":0.07483710276364233,"score_gpt":0.3494602198399551,"score_spread":0.2746231170763128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169101793","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9956584,0.00021036234,0.0036182713,0.0000061305072,0.000017851866,0.000039440212,0.000030123545,0.000048092366,0.00037146176],"genre_scores_gemma":[0.98974365,0.0001776257,0.009253656,0.000006838679,0.000009594619,0.000010920844,0.000078884244,0.000019586148,0.0006993151],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99705315,0.0005719664,0.00020184017,0.00027771585,0.0016688491,0.0002264162],"domain_scores_gemma":[0.9946926,0.0015846427,0.0011162047,0.00043685047,0.0018799084,0.0002898553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021665948,0.00084265403,0.0005219877,0.0009638962,0.00044252185,0.00034210845,0.0005667663,0.0005885485,0.0010843751],"category_scores_gemma":[0.004444401,0.00050049875,0.00042216489,0.00039684027,0.0004756611,0.00072564406,0.0005177334,0.00041922944,0.00031262715],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018847089,0.0006062927,0.017084384,0.0005529679,0.00006195235,0.00036869376,0.0003591206,0.0057448205,0.9268321,0.00009862236,0.00006379056,0.046342462],"study_design_scores_gemma":[0.0000738394,0.022874493,0.06942948,0.000033252618,0.00015783655,0.0009192329,0.00033173352,0.004240006,0.9005264,0.000041057825,0.0013141324,0.00005853491],"about_ca_topic_score_codex":0.0009237498,"about_ca_topic_score_gemma":0.0028706628,"teacher_disagreement_score":0.0021665948,"about_ca_system_score_codex":0.00032200397,"about_ca_system_score_gemma":0.00033851425,"threshold_uncertainty_score":0.011458218},"labels":[],"label_agreement":null},{"id":"W2169188219","doi":"10.1061/9780784413517.081","title":"Testing the Application of Google Fusion Tables as a Collaborative Productivity Database and Benchmarking System for the Construction Industry","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"Google","keywords":"Benchmarking; Upload; Database; World Wide Web; Computer science; The Internet; Publication; Business","score_opus":0.028691096176073082,"score_gpt":0.29674722201503506,"score_spread":0.268056125838962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2169188219","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94318116,0.00012542612,0.031879935,0.00048399557,0.00013947142,0.002001968,0.0039036635,0.00776682,0.0105176205],"genre_scores_gemma":[0.90217984,0.00012168251,0.089368194,0.00008640308,0.000029507499,0.00070888235,0.0052244314,0.00033036558,0.0019506753],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99219346,0.0028497116,0.000859723,0.0009404806,0.0026673037,0.0004892396],"domain_scores_gemma":[0.9866002,0.005188957,0.0006297501,0.0030448195,0.0037886507,0.00074761204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010373942,0.0005836867,0.00054104044,0.0028492024,0.0009357094,0.0023955149,0.002096168,0.0009165686,0.0019337216],"category_scores_gemma":[0.02023228,0.00038295248,0.00067160255,0.0037090795,0.0007983312,0.003324614,0.0028948549,0.0006387718,0.00070823403],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0062423013,0.008167597,0.23328252,0.0017570644,0.0005283876,0.0017646898,0.02032947,0.05117151,0.040722083,0.020976242,0.0300744,0.5849837],"study_design_scores_gemma":[0.0017958536,0.0123540675,0.36102417,0.0004489176,0.0005720384,0.0013790603,0.021791024,0.4085737,0.07441755,0.008804228,0.10812273,0.0007166045],"about_ca_topic_score_codex":0.027213763,"about_ca_topic_score_gemma":0.017161237,"teacher_disagreement_score":0.027213763,"about_ca_system_score_codex":0.0019863273,"about_ca_system_score_gemma":0.003301448,"threshold_uncertainty_score":0.054863274},"labels":[],"label_agreement":null},{"id":"W2171106967","doi":"10.5555/2429759.2429834","title":"Simulation of mobile crane operations in 3D space","year":2012,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Visualization; Lift (data mining); Schedule; Process (computing); Computer science; Engineering; Industrial engineering; Simulation; Operations research; Artificial intelligence; Data mining","score_opus":0.020845654736853087,"score_gpt":0.26657029769668655,"score_spread":0.24572464295983346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171106967","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5983727,0.00013687469,0.37100482,0.00033602255,0.00008958024,0.00035148358,0.0017199119,0.0018452004,0.026143352],"genre_scores_gemma":[0.94169945,0.0001779102,0.053187776,0.000028384575,0.000008183931,0.0002821572,0.00059480424,0.000072185445,0.0039492184],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99983394,0.00004673407,0.000009891352,0.000019726496,0.00006322372,0.000026464068],"domain_scores_gemma":[0.9996712,0.00017759425,0.000024439467,0.000036098943,0.00005266339,0.00003795677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024616922,0.00050627074,0.00035725406,0.00042063196,0.0004690657,0.0008844079,0.00069601805,0.00085615105,0.004894125],"category_scores_gemma":[0.000714982,0.00031283285,0.0006462347,0.0004265989,0.0005065403,0.00044866488,0.0008836195,0.000380652,0.00042395305],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007401227,0.00003587526,0.0012825486,0.000034156525,0.000009633427,0.00010156782,0.00014982521,0.9900067,0.0023228729,0.0014650071,0.00026713277,0.004250662],"study_design_scores_gemma":[0.000026668173,0.000045270262,0.0005268825,0.0000069204534,0.00000436607,0.000024068182,0.00007819807,0.9966306,0.0010041124,0.00045536776,0.0011870812,0.000010556831],"about_ca_topic_score_codex":0.01795943,"about_ca_topic_score_gemma":0.015823552,"teacher_disagreement_score":0.01795943,"about_ca_system_score_codex":0.0004091472,"about_ca_system_score_gemma":0.0009509904,"threshold_uncertainty_score":0.03570974},"labels":[],"label_agreement":null},{"id":"W2171373484","doi":"10.5555/2675983.2676371","title":"Development of a distributed construction project management game with COTS in the loop","year":2013,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Game programming; Game development tool; Interface (matter); User interface; Graphical user interface; Game Developer; Human–computer interaction; Game design; Game design document; Software engineering; Operating system","score_opus":0.019781264212493332,"score_gpt":0.23081850892737749,"score_spread":0.21103724471488416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171373484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11351969,0.000086859865,0.8449281,0.00031820868,0.00015496957,0.0035354027,0.00033637884,0.007297713,0.029822707],"genre_scores_gemma":[0.2306123,0.00012423228,0.75459725,0.000091334296,0.00001012543,0.0018279459,0.00040543612,0.00033396098,0.011997376],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994661,0.00014950498,0.000045338486,0.00007722066,0.00020114583,0.000060681286],"domain_scores_gemma":[0.99921143,0.0002839325,0.000029117888,0.00008246139,0.00022613035,0.00016699808],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011848222,0.00086400745,0.00057257875,0.00055447145,0.00037435442,0.0009013446,0.0017892809,0.0007136117,0.0060986457],"category_scores_gemma":[0.002312174,0.00055237545,0.0005209953,0.00021201026,0.0004436511,0.00096639013,0.0015182811,0.000905862,0.00089033827],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018425585,0.00566554,0.009113696,0.0017593071,0.00021688388,0.0023093324,0.006880665,0.21983784,0.16379474,0.07797597,0.02009348,0.49051002],"study_design_scores_gemma":[0.0007845515,0.002447012,0.0049770116,0.0003209726,0.00011638814,0.001140927,0.00065019494,0.8226635,0.041370254,0.0069651003,0.118400306,0.00016391317],"about_ca_topic_score_codex":0.0032484266,"about_ca_topic_score_gemma":0.0030008901,"teacher_disagreement_score":0.0060986457,"about_ca_system_score_codex":0.00064013177,"about_ca_system_score_gemma":0.0013097953,"threshold_uncertainty_score":0.020402014},"labels":[],"label_agreement":null},{"id":"W2171490605","doi":"10.1109/nafips.2012.6291023","title":"Modeling construction labour productivity using fuzzy logic and exploring the use of fuzzy hybrid techniques","year":2012,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Fuzzy set operations; Neuro-fuzzy; Computer science; Defuzzification; Fuzzy set; Artificial intelligence; Fuzzy classification; Machine learning; Data mining; Fuzzy number; Fuzzy control system","score_opus":0.0881530043387268,"score_gpt":0.2420936888796831,"score_spread":0.1539406845409563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171490605","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14182901,0.00022437557,0.850676,0.00014950741,0.000016712951,0.00004672508,0.000065903725,0.0001060043,0.0068857684],"genre_scores_gemma":[0.9321827,0.00027963222,0.065505564,0.000019441557,0.000011782749,0.000072822564,0.00005057846,0.00001324251,0.0018642123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961984,0.0001536411,0.0000205535,0.000055742636,0.00010661312,0.00004358344],"domain_scores_gemma":[0.99944395,0.00037518193,0.00006537444,0.000030336138,0.00006949377,0.000015612834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011009523,0.0006216919,0.00037613913,0.0011908165,0.00032788643,0.0013237768,0.0007947785,0.00065172394,0.0011538446],"category_scores_gemma":[0.0019924755,0.00031224528,0.0007668454,0.0010951535,0.0004152831,0.0011238074,0.0005233769,0.00035349774,0.00012658497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014512339,0.000023684066,0.0017270832,0.00002558383,0.000027315937,0.000039688322,0.000083192084,0.9756389,0.0008599597,0.007142215,0.00006210818,0.014355651],"study_design_scores_gemma":[0.0000019810984,0.000010477623,0.0005169478,0.000006525868,0.000006178721,0.000009373852,0.000028619801,0.9947902,0.0002854208,0.0041402667,0.00019737553,0.000006690354],"about_ca_topic_score_codex":0.012740418,"about_ca_topic_score_gemma":0.008769798,"teacher_disagreement_score":0.012740418,"about_ca_system_score_codex":0.00091897865,"about_ca_system_score_gemma":0.00072558015,"threshold_uncertainty_score":0.02533257},"labels":[],"label_agreement":null},{"id":"W2171954146","doi":"","title":"Accessibility Assessment Via Workspace Estimation","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Workspace; Degrees of freedom (physics and chemistry); Process (computing); Kinematics; Computer science; Motion (physics); Motion planning; Artificial intelligence","score_opus":0.012284116226607172,"score_gpt":0.2542663783538581,"score_spread":0.24198226212725096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2171954146","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067645865,0.00013874815,0.9902749,0.000053064054,0.000010625773,0.000030176336,0.00006503416,0.00043970507,0.0022231336],"genre_scores_gemma":[0.44819793,0.00049828563,0.54801893,0.000030248055,0.000032892152,0.00014838208,0.0005270683,0.00014599806,0.0024002679],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982936,0.00071382825,0.00007588158,0.00027610594,0.00052004715,0.000120506535],"domain_scores_gemma":[0.9976191,0.0010939958,0.00026584705,0.0002740752,0.0006475575,0.00009945838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013827987,0.0010430138,0.001004467,0.0037558384,0.00049144845,0.0018271505,0.0009627582,0.0008954906,0.0053918175],"category_scores_gemma":[0.010736752,0.0004812493,0.0006176458,0.0017158687,0.0008754819,0.003170084,0.0032389066,0.00087196904,0.0015349479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021785143,0.00008954915,0.0058913,0.00033647963,0.000067431574,0.0001955411,0.00039931946,0.36706635,0.008721732,0.042059124,0.0030478812,0.57190746],"study_design_scores_gemma":[0.000020821797,0.00010684123,0.0032393348,0.00010475006,0.000039457926,0.0002681494,0.00026182533,0.928988,0.008563303,0.05361317,0.004730352,0.00006404415],"about_ca_topic_score_codex":0.0022950582,"about_ca_topic_score_gemma":0.0023481383,"teacher_disagreement_score":0.0053918175,"about_ca_system_score_codex":0.0004650599,"about_ca_system_score_gemma":0.0007701093,"threshold_uncertainty_score":0.018037379},"labels":[],"label_agreement":null},{"id":"W2172197475","doi":"10.5539/cis.v4n2p132","title":"Service Oriented Application in Agent Based Virtual Knowledge Community","year":2011,"lang":"en","type":"article","venue":"Computer and Information Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Virtual community; Knowledge management; Cyberspace; Serviceability (structure); Knowledge sharing; The Internet; Service (business); Construct (python library); Architecture; World Wide Web; Business","score_opus":0.017919460007538197,"score_gpt":0.21691704228586875,"score_spread":0.19899758227833056,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2172197475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057738464,0.00040277932,0.8984301,0.0019245219,0.00018804736,0.00041040158,0.00005432379,0.0020259016,0.03882542],"genre_scores_gemma":[0.72042716,0.00049026235,0.263757,0.00031533497,0.000086506414,0.00043337894,0.000112605165,0.00012670201,0.014251087],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987973,0.00063188194,0.00006388596,0.00011566145,0.00031179312,0.00007935131],"domain_scores_gemma":[0.9988305,0.00053238746,0.00008555009,0.00014638361,0.00023817118,0.00016714838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016862176,0.00034718408,0.0003923534,0.0010601969,0.0013952844,0.002264876,0.0010847538,0.0014705816,0.00405264],"category_scores_gemma":[0.003921605,0.00022889656,0.00055053155,0.00111214,0.0013469883,0.0024347664,0.0025175812,0.00081462006,0.0009865692],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026298652,0.0005228074,0.0030550177,0.00042000366,0.000093225965,0.0016361894,0.0035235798,0.12175029,0.013506898,0.6727873,0.008525084,0.17391656],"study_design_scores_gemma":[0.000077856384,0.00012163157,0.00041074998,0.000058628964,0.00004741036,0.00035739012,0.0005319856,0.74163747,0.0030575274,0.2058754,0.047787238,0.000036671227],"about_ca_topic_score_codex":0.0029658165,"about_ca_topic_score_gemma":0.0021232045,"teacher_disagreement_score":0.00405264,"about_ca_system_score_codex":0.0009548245,"about_ca_system_score_gemma":0.0013424942,"threshold_uncertainty_score":0.013557434},"labels":[],"label_agreement":null},{"id":"W2174622052","doi":"","title":"1.0 Introduction : Directives concernant l'exposition à la silice sur les chantiers de construction | Ministère du Travail de l'Ontario","year":2006,"lang":"fr","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Exposition (narrative); Political science; Humanities; Art; Literature","score_opus":0.004181251236417405,"score_gpt":0.17114924133966083,"score_spread":0.16696799010324342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2174622052","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0069134,0.035444967,0.005579432,0.10074122,0.018162124,0.00038874373,0.011419639,0.0012570699,0.8200934],"genre_scores_gemma":[0.014773641,0.012319007,0.002102228,0.0075866724,0.0019729557,0.000099427074,0.0020665862,0.00048441152,0.9585951],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99812824,0.00011357008,0.000083062005,0.00017086,0.001301504,0.00020281963],"domain_scores_gemma":[0.9985348,0.00028549964,0.00011610555,0.000077563825,0.00084501336,0.0001409928],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012713543,0.0006551757,0.0004398249,0.0017180428,0.0038086856,0.0045574224,0.0011299131,0.0038123582,0.07221189],"category_scores_gemma":[0.0021842604,0.00071970373,0.00037169678,0.0029618922,0.002224536,0.0015177708,0.0014222771,0.0032801977,0.021786394],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038681865,0.000027509657,0.0006805483,0.00047849596,0.0000029402825,0.00012900241,0.0022453137,0.00021903569,0.001545883,0.036743533,0.9277228,0.030166294],"study_design_scores_gemma":[0.0000017579172,0.0000046116347,0.001268971,0.0000835579,9.2757097e-7,0.000015850628,0.00012884056,0.000012796652,0.00008201993,0.00035204628,0.9980432,0.000005380247],"about_ca_topic_score_codex":0.6832643,"about_ca_topic_score_gemma":0.7833008,"teacher_disagreement_score":0.31673568,"about_ca_system_score_codex":0.017656766,"about_ca_system_score_gemma":0.016339691,"threshold_uncertainty_score":0.637202},"labels":[],"label_agreement":null},{"id":"W2175616469","doi":"10.3390/buildings5041265","title":"Evaluating the Alignment of Organizational and Project Contexts for BIM Adoption: A Case Study of a Large Owner Organization","year":2015,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Knowledge management; Process management; Facility management; Work (physics); Information exchange; Organizational structure; Order (exchange); Computer science; Business; Engineering; Operations management; Marketing","score_opus":0.04047435413144313,"score_gpt":0.31350886171713294,"score_spread":0.2730345075856898,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2175616469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981548,0.000013310695,0.0010147075,0.00007006946,0.0000012174708,0.00005264663,0.000012661051,0.000004711004,0.000675823],"genre_scores_gemma":[0.9970186,0.000036701138,0.0025342463,0.000022983706,0.0000016814474,0.000053867858,0.000021818509,0.0000068814993,0.00030328438],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9932682,0.0047891065,0.00020281882,0.00037139436,0.00074812956,0.00062039425],"domain_scores_gemma":[0.97896373,0.013956365,0.0025401479,0.0011791562,0.0022498819,0.0011107707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008123406,0.0002930072,0.00034139788,0.0014211939,0.003068769,0.0027208598,0.0012370958,0.0011263749,0.0012322053],"category_scores_gemma":[0.018982245,0.00037992097,0.0002777427,0.0016008293,0.002370846,0.0021980654,0.0026302787,0.000877587,0.00017652956],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060849637,0.00806442,0.43314126,0.0004138207,0.00011777603,0.009025146,0.40372348,0.007134307,0.008767133,0.0061122356,0.0011580448,0.12173386],"study_design_scores_gemma":[0.000080898026,0.0034580838,0.2366868,0.0001698211,0.000091178765,0.001477862,0.7294936,0.01386531,0.0049254526,0.0015999199,0.008041057,0.00010998699],"about_ca_topic_score_codex":0.009782587,"about_ca_topic_score_gemma":0.029923622,"teacher_disagreement_score":0.009782587,"about_ca_system_score_codex":0.003497685,"about_ca_system_score_gemma":0.0028862937,"threshold_uncertainty_score":0.04296124},"labels":[],"label_agreement":null},{"id":"W2176047745","doi":"10.22260/isarc2013/0049","title":"Dynamic Planning of Construction Activities Using Hybrid Simulation","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Process (computing); Computer science; System dynamics; Scheduling (production processes); Representation (politics); Dimension (graph theory); Discrete event simulation; Project planning; Project management; Industrial engineering; Systems engineering; Operations research; Simulation; Engineering; Operations management; Artificial intelligence","score_opus":0.010347453201509062,"score_gpt":0.22047614149626132,"score_spread":0.21012868829475226,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2176047745","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031325627,0.00011869445,0.95846003,0.00007616327,0.000020898571,0.000077147015,0.000103859806,0.00043486778,0.009382728],"genre_scores_gemma":[0.87514704,0.0002848165,0.12053861,0.000028743205,0.0000111856525,0.00034952385,0.00021418445,0.000060447965,0.0033654983],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999561,0.00015852263,0.000026969783,0.00007409229,0.00012974467,0.00004970736],"domain_scores_gemma":[0.99935704,0.0004149379,0.00006029845,0.000044704488,0.00008767017,0.00003535944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006465744,0.00064152404,0.0007021945,0.0009784348,0.00045831877,0.0013291485,0.0010593235,0.00078760134,0.002614976],"category_scores_gemma":[0.0011949315,0.00054767216,0.00093852857,0.00088811584,0.0006608271,0.00078778417,0.0011986346,0.00052985305,0.00027597995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012508674,0.000007558455,0.00021679039,0.000011013336,0.000007942812,0.00001680477,0.000018764264,0.99437124,0.0002883747,0.002065232,0.00003745675,0.0029463742],"study_design_scores_gemma":[0.0000026406337,0.0000071919103,0.000045788194,0.0000024355209,0.0000022181932,0.000004097944,0.0000068629156,0.9986738,0.0001299139,0.00088398554,0.00023841059,0.0000026529087],"about_ca_topic_score_codex":0.010363167,"about_ca_topic_score_gemma":0.006879886,"teacher_disagreement_score":0.010363167,"about_ca_system_score_codex":0.00093967834,"about_ca_system_score_gemma":0.0010848984,"threshold_uncertainty_score":0.020605683},"labels":[],"label_agreement":null},{"id":"W2177894083","doi":"10.1139/cjce-2014-0484","title":"Assessing the performance of the building information modeling (BIM) implementation process within a small specialty contracting enterprise","year":2015,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia; École de Technologie Supérieure","funders":"Industry Canada","keywords":"Building information modeling; Integrated project delivery; Process (computing); Scope (computer science); Process management; Enabling; Quality (philosophy); Business; Project management; Engineering management; Operations management; Engineering; Systems engineering; Computer science","score_opus":0.015692255746020147,"score_gpt":0.2335851830228926,"score_spread":0.21789292727687246,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2177894083","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9986223,0.000009388717,0.0003609699,0.00004128299,7.643881e-7,0.000027261261,0.000008597563,0.0000044095614,0.0009251503],"genre_scores_gemma":[0.99806994,0.0000365437,0.0014711684,0.000011995955,0.0000012365545,0.00002386543,0.000030124856,0.000003081709,0.0003521835],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99161714,0.003266132,0.0004693813,0.00076776906,0.0026875755,0.0011919695],"domain_scores_gemma":[0.97314996,0.0119513655,0.004521805,0.0013503614,0.0070037856,0.0020227286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012481056,0.0003204513,0.00031068988,0.001719293,0.002078897,0.0030852228,0.0009614822,0.00073291984,0.0008742686],"category_scores_gemma":[0.03113898,0.00033091533,0.00023670091,0.0020657405,0.0014983538,0.0017428849,0.0021315385,0.00073285564,0.00030231092],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090061687,0.0028550038,0.6744503,0.00026417678,0.00009796463,0.0012349518,0.08447559,0.009572578,0.014043591,0.002177888,0.0006219192,0.20930548],"study_design_scores_gemma":[0.000023142988,0.0035897077,0.88346696,0.00009350403,0.000053612977,0.000309879,0.08985501,0.014555811,0.0050559156,0.00053902564,0.0023582054,0.00009931171],"about_ca_topic_score_codex":0.033967122,"about_ca_topic_score_gemma":0.06287822,"teacher_disagreement_score":0.033967122,"about_ca_system_score_codex":0.005439438,"about_ca_system_score_gemma":0.0059003388,"threshold_uncertainty_score":0.06753886},"labels":[],"label_agreement":null},{"id":"W2178405569","doi":"10.1016/j.autcon.2015.09.006","title":"A hybrid simulation approach for quantitatively analyzing the impact of facility size on construction projects","year":2015,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Sizing; Process (computing); Flexibility (engineering); Industrial engineering; Discrete event simulation; Simulation modeling; Computer science; Operations research; Project management; Interdependence; Task (project management); Facility management; Engineering; Systems engineering; Simulation","score_opus":0.04389776266904169,"score_gpt":0.29872320346662223,"score_spread":0.2548254407975805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178405569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40971464,0.00020159782,0.5719055,0.0001775761,0.000053348333,0.00012430479,0.0006276819,0.0012335151,0.01596183],"genre_scores_gemma":[0.96274066,0.00006676574,0.03551642,0.000027793903,0.00000824393,0.00011324096,0.00017085932,0.00005226373,0.0013037771],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995789,0.00017982656,0.000017298014,0.000049597304,0.000116990486,0.000057436842],"domain_scores_gemma":[0.9986123,0.0009403647,0.000095195945,0.00012763262,0.00016718885,0.00005729277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00078755565,0.0006026329,0.00090995326,0.001349237,0.00047026935,0.0008999535,0.001147107,0.0011695203,0.0026469876],"category_scores_gemma":[0.0018497716,0.0005515492,0.0008388602,0.0013508699,0.00051219616,0.0007471214,0.00069469167,0.0004833109,0.00021056902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003250249,0.000031685504,0.00074825983,0.000008487713,0.000017791866,0.000012900664,0.000012499043,0.99510103,0.0007440359,0.0012146162,0.000049118265,0.002027073],"study_design_scores_gemma":[0.0000037256639,0.000012282052,0.00016723508,9.654927e-7,0.000003718111,0.0000042083607,0.0000043347122,0.9992066,0.0001986799,0.00032281858,0.00007231579,0.0000030304109],"about_ca_topic_score_codex":0.017301247,"about_ca_topic_score_gemma":0.011498964,"teacher_disagreement_score":0.017301247,"about_ca_system_score_codex":0.0012194419,"about_ca_system_score_gemma":0.0011951437,"threshold_uncertainty_score":0.03440112},"labels":[],"label_agreement":null},{"id":"W2178688148","doi":"10.1007/1-4020-4891-2_48","title":"Interactive Knowledge-Based Assistance For Conceptual Design of Building Structures","year":2007,"lang":"en","type":"book-chapter","venue":"Solid mechanics and its applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Conceptual design; Knowledge base; Computer science; Engineering; Systems engineering; Software engineering; Architectural design; Architectural technology; Construction engineering; Human–computer interaction; Architecture; Artificial intelligence","score_opus":0.03279335887861892,"score_gpt":0.27961576885262823,"score_spread":0.2468224099740093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2178688148","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006261209,0.00027029647,0.9607895,0.00009436006,0.000030907104,0.00004210383,0.00012233714,0.0034627889,0.028926466],"genre_scores_gemma":[0.17633961,0.0010915669,0.772194,0.000100044395,0.000027818895,0.00022959063,0.0010720345,0.0007849741,0.048160393],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981886,0.000036999325,0.0000061794644,0.000029835051,0.000091368864,0.000016708966],"domain_scores_gemma":[0.99978703,0.00014529897,0.000005028133,0.000029837121,0.000024526546,0.000008298137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00023904716,0.0007451405,0.0004668536,0.0003761673,0.00033211568,0.0011025502,0.0019523454,0.0009579103,0.019325348],"category_scores_gemma":[0.00086230616,0.00038332012,0.0004659664,0.00038608658,0.0004803927,0.0009988577,0.0016333704,0.0006812558,0.0029963823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012371717,0.00016017599,0.00024243748,0.0006511791,0.00003491327,0.00058936555,0.002195239,0.107772596,0.04190749,0.07265128,0.035564654,0.7381069],"study_design_scores_gemma":[0.00005649662,0.000072239134,0.0007190591,0.00023168651,0.000051833784,0.0007524447,0.00056457176,0.628577,0.03411893,0.07238069,0.2624197,0.00005533993],"about_ca_topic_score_codex":0.0021330146,"about_ca_topic_score_gemma":0.0039081224,"teacher_disagreement_score":0.019325348,"about_ca_system_score_codex":0.00030676174,"about_ca_system_score_gemma":0.00044499143,"threshold_uncertainty_score":0.0646497},"labels":[],"label_agreement":null},{"id":"W2180715974","doi":"10.1155/2015/579486","title":"An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study","year":2015,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Schedule; Building information modeling; Earned value management; Project management; Process (computing); Project planning; Construction management; Pre-construction services; Systems engineering; Cost estimate; Project management triangle; Track (disk drive); Computer science; Engineering management; Engineering; Operations management; Scheduling (production processes); Project charter; Civil engineering","score_opus":0.012136623610980522,"score_gpt":0.22200720299923216,"score_spread":0.20987057938825163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2180715974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9571358,0.00017977606,0.032863863,0.0003798308,0.000024597173,0.00038967314,0.00060935837,0.0003267476,0.008090386],"genre_scores_gemma":[0.9428911,0.00022909857,0.053442743,0.000039601353,0.000011327306,0.0002313583,0.0005088235,0.00007754108,0.002568374],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9974685,0.0012238341,0.00017801407,0.00020238695,0.0007453602,0.00018196188],"domain_scores_gemma":[0.99641246,0.001673211,0.00030337705,0.00061771454,0.00069889106,0.00029433938],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034044855,0.00050436286,0.0004860733,0.0021794848,0.0012603446,0.0015963772,0.0011602793,0.001592493,0.002223501],"category_scores_gemma":[0.005136969,0.00050143927,0.00048529988,0.0038546734,0.0007047024,0.0015460108,0.0011334782,0.00070330926,0.000605776],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017029326,0.008952032,0.1790502,0.0011919889,0.00022948695,0.018941758,0.022559084,0.17272745,0.024544451,0.019860629,0.01181826,0.53842187],"study_design_scores_gemma":[0.00046759326,0.0046542506,0.19737536,0.00037033652,0.00038037545,0.009344501,0.026903337,0.6255554,0.044861812,0.0067410823,0.08291039,0.00043555978],"about_ca_topic_score_codex":0.008188433,"about_ca_topic_score_gemma":0.012690243,"teacher_disagreement_score":0.008188433,"about_ca_system_score_codex":0.0015163298,"about_ca_system_score_gemma":0.0015373952,"threshold_uncertainty_score":0.018004835},"labels":[],"label_agreement":null},{"id":"W2181076214","doi":"10.22260/isarc2009/0048","title":"Integrating Automated Data Acquisition Technologies for Progress Reporting of Construction Projects","year":2009,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Data acquisition; Automation; Software; Data collection; Data management; Coding (social sciences); Schedule; Photogrammetry; Bar chart; Software engineering; Systems engineering; Database; Engineering; Operating system; Artificial intelligence","score_opus":0.025918574307384444,"score_gpt":0.2721018466850441,"score_spread":0.24618327237765966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2181076214","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03773652,0.0009207331,0.9454095,0.00024495405,0.0000928656,0.0005966123,0.00044020053,0.008158052,0.0064006266],"genre_scores_gemma":[0.5093943,0.0013207181,0.4829486,0.00008230898,0.00008228064,0.0006473674,0.0014134389,0.00024251043,0.0038684746],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9957248,0.0010161846,0.00044801473,0.00044457195,0.0022470094,0.00011952536],"domain_scores_gemma":[0.9958163,0.0016053276,0.00049118034,0.00064874487,0.001366659,0.000071759874],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033998017,0.00067789,0.00042233974,0.003241727,0.00027964465,0.0022195955,0.0010557214,0.00042812375,0.0016168592],"category_scores_gemma":[0.0048087756,0.0004440105,0.00047080423,0.0019849667,0.00035712807,0.0018189567,0.00078771665,0.00042999722,0.0006136017],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002677687,0.000320905,0.009567133,0.00035680959,0.00011472618,0.00015834793,0.00046222928,0.047535352,0.026321977,0.007660596,0.005182079,0.90205204],"study_design_scores_gemma":[0.00017185094,0.0010230709,0.016655115,0.0003300487,0.00029288974,0.00053885527,0.00057803723,0.75348634,0.12759584,0.006826811,0.092264585,0.0002365422],"about_ca_topic_score_codex":0.0050479136,"about_ca_topic_score_gemma":0.0027348981,"teacher_disagreement_score":0.0050479136,"about_ca_system_score_codex":0.00093082944,"about_ca_system_score_gemma":0.0012031817,"threshold_uncertainty_score":0.017980099},"labels":[],"label_agreement":null},{"id":"W2182544120","doi":"","title":"INTEGRATING BAR CODING AND RFID TO AUTOMATE DATA COLLECTION FROM CONSTRUCTION SITES","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Coding (social sciences); Data collection; Computer science; Data acquisition; Real-time computing; Operating system","score_opus":0.013053787473384012,"score_gpt":0.22664539932216443,"score_spread":0.21359161184878042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182544120","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005396425,0.00028785062,0.98997283,0.000104925246,0.00009611235,0.0003465064,0.00009280423,0.00087334996,0.0028292332],"genre_scores_gemma":[0.034919187,0.00037281547,0.96185976,0.00008856402,0.000039680832,0.0003022848,0.00020290185,0.00007552588,0.002139206],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99026674,0.0023296203,0.0007569433,0.0013169461,0.004934229,0.0003955017],"domain_scores_gemma":[0.98577166,0.0046182093,0.002104541,0.00247486,0.0048739323,0.00015672744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00597555,0.0011624205,0.000837878,0.0054346905,0.0006106476,0.0024451995,0.0021353706,0.0014954631,0.0019769121],"category_scores_gemma":[0.011080419,0.0008507364,0.000915421,0.0058180317,0.0011004893,0.0036159086,0.0023690173,0.0013505279,0.0023023875],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015154952,0.00031788554,0.0063208146,0.0012912495,0.0000666222,0.00020547598,0.0010143415,0.008441573,0.06881284,0.020360883,0.0024493341,0.8905673],"study_design_scores_gemma":[0.000110307796,0.003318263,0.028499806,0.0017759315,0.0003465409,0.0036089167,0.0020257272,0.18291724,0.49043185,0.050680388,0.23539704,0.00088805],"about_ca_topic_score_codex":0.0013162374,"about_ca_topic_score_gemma":0.0022126199,"teacher_disagreement_score":0.00597555,"about_ca_system_score_codex":0.00080060866,"about_ca_system_score_gemma":0.0017726743,"threshold_uncertainty_score":0.031602085},"labels":[],"label_agreement":null},{"id":"W2182695012","doi":"10.12821/ijispm030103","title":"Defining Building Information Modeling implementation activities based on capability maturity evaluation: a theoretical model","year":2022,"lang":"en","type":"article","venue":"International journal of information systems and project management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"Centre interuniversitaire de recherche sur les reseaux d'entreprise, la logistique et le transport; Polytechnique Montréal","keywords":"Building information modeling; Maturity (psychological); Capability Maturity Model; Process management; Computer science; Service Integration Maturity Model; Architecture; Knowledge management; Information model; Systems engineering; Engineering; Engineering management; Risk analysis (engineering); Software engineering; Business; Operations management; Software","score_opus":0.012334280257843711,"score_gpt":0.2794577903471058,"score_spread":0.26712351008926205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182695012","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.078147605,0.0004871498,0.81162536,0.0030576729,0.000024181008,0.0017045484,0.00023151589,0.00034891875,0.10437315],"genre_scores_gemma":[0.62304085,0.00060948386,0.3710375,0.00011691777,0.000012729966,0.0015341514,0.00032626605,0.0000414237,0.0032807682],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9944956,0.002674737,0.000461992,0.0004942475,0.0013476474,0.0005257986],"domain_scores_gemma":[0.9888337,0.0062334538,0.0015152645,0.00070405356,0.0021791228,0.00053446606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007229269,0.0011374577,0.00039564798,0.006583925,0.0012045985,0.006024287,0.0016186761,0.0019190283,0.0035193528],"category_scores_gemma":[0.013213095,0.0006327427,0.0010182797,0.003690943,0.003017037,0.008914425,0.0029032738,0.0018489292,0.0008408789],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053899188,0.0005609388,0.019000886,0.00052937074,0.00005706652,0.00030244037,0.007732832,0.031549186,0.0022660757,0.81358594,0.0011608677,0.12320059],"study_design_scores_gemma":[0.00012211931,0.00084744964,0.01898967,0.0021629564,0.00018848653,0.0006733815,0.015659485,0.4683516,0.008959385,0.43962452,0.044184808,0.00023625168],"about_ca_topic_score_codex":0.0068074386,"about_ca_topic_score_gemma":0.0042552114,"teacher_disagreement_score":0.007229269,"about_ca_system_score_codex":0.00525644,"about_ca_system_score_gemma":0.009535235,"threshold_uncertainty_score":0.038232505},"labels":[],"label_agreement":null},{"id":"W2182852836","doi":"","title":"Acquisition And Modeling Of Conceptual Structural Design Knowledge","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Conceptual design; Computer science; Knowledge acquisition; Process (computing); Knowledge representation and reasoning; Design knowledge; Component (thermodynamics); Procedural knowledge; Human–computer interaction; Software engineering; Conceptual model; Knowledge management; Knowledge engineering; Artificial intelligence; Programming language","score_opus":0.01656420565880361,"score_gpt":0.23053253962528486,"score_spread":0.21396833396648124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2182852836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025744803,0.00013158153,0.955597,0.000303903,0.000013066013,0.00031584885,0.00028642773,0.0005748972,0.01703256],"genre_scores_gemma":[0.3055941,0.0004595746,0.68755484,0.00005855023,0.000010029075,0.0006671821,0.0010481622,0.00012022644,0.0044874647],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99735284,0.00092580443,0.00017902219,0.0003365314,0.0010911253,0.000114687566],"domain_scores_gemma":[0.9939966,0.0032730794,0.00033662177,0.0013772041,0.0009460484,0.000070373535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036171544,0.0006507228,0.00047128287,0.0027243826,0.0006795598,0.0045150896,0.002428689,0.001266328,0.0051040733],"category_scores_gemma":[0.013102279,0.00093785994,0.00097036053,0.0016358638,0.0015429043,0.0042920006,0.001829771,0.0011556267,0.0010871901],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015147634,0.0004102037,0.0040162927,0.00088875944,0.00007121965,0.0006279568,0.008531908,0.32029104,0.007124025,0.3639245,0.0026045104,0.29135826],"study_design_scores_gemma":[0.000054716227,0.00013287405,0.0014518573,0.00041674334,0.000062857864,0.0003118334,0.0015957687,0.82622445,0.0075984295,0.124480106,0.037609298,0.000061138475],"about_ca_topic_score_codex":0.004416346,"about_ca_topic_score_gemma":0.006373464,"teacher_disagreement_score":0.0051040733,"about_ca_system_score_codex":0.002131943,"about_ca_system_score_gemma":0.002624617,"threshold_uncertainty_score":0.019129574},"labels":[],"label_agreement":null},{"id":"W2183555822","doi":"10.1109/wsc.2008.4736355","title":"An integrated CAD and simulation model for concrete operations","year":2008,"lang":"en","type":"article","venue":"2008 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Visual Basic for Applications; Downtown; Slab; CAD; Computer science; Software; Engineering drawing; 3d model; Civil engineering; Engineering; Architectural engineering; Structural engineering; Programming language; Geography; Artificial intelligence","score_opus":0.03987809268743568,"score_gpt":0.2723750604807495,"score_spread":0.2324969677933138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183555822","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029107466,0.00023568963,0.94156504,0.00022215019,0.00007687108,0.00015906394,0.00089587684,0.0015177266,0.026220076],"genre_scores_gemma":[0.72399205,0.00093260536,0.24106763,0.00012176007,0.00004950671,0.00090825994,0.0021024637,0.00033766133,0.030487929],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996196,0.000063459556,0.000030719923,0.000063205815,0.00017325622,0.0000497281],"domain_scores_gemma":[0.99973863,0.0000882814,0.000029526856,0.000030606134,0.0000956714,0.000017266675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003756912,0.000738449,0.0007226784,0.00076853565,0.00041419055,0.0015340479,0.0014027595,0.0016351762,0.007896212],"category_scores_gemma":[0.0008876561,0.00062587555,0.0009979336,0.0008612494,0.00051787164,0.00095422973,0.00066396495,0.0007870192,0.0012540784],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002647982,0.000023882929,0.00031943826,0.000025688925,0.00000880722,0.0000484236,0.00003936064,0.98337495,0.0014928263,0.009722148,0.0003187362,0.004599314],"study_design_scores_gemma":[0.000008641476,0.000012193619,0.00010160977,0.000005828787,0.00000809605,0.000019756517,0.000007872079,0.99496245,0.0006135639,0.0011525721,0.0031013058,0.000006019011],"about_ca_topic_score_codex":0.013966521,"about_ca_topic_score_gemma":0.008627179,"teacher_disagreement_score":0.013966521,"about_ca_system_score_codex":0.0009588813,"about_ca_system_score_gemma":0.001584151,"threshold_uncertainty_score":0.02777046},"labels":[],"label_agreement":null},{"id":"W2183649514","doi":"10.5539/ijms.v7n6p162","title":"Critical Barriers to BIM Implementation in the AEC Industry","year":2015,"lang":"en","type":"article","venue":"International Journal of Marketing Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":165,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Business; Construction industry; Process management; Engineering management; Knowledge management; Construction engineering; Computer science; Operations management; Engineering","score_opus":0.029005603909908178,"score_gpt":0.3598112690651132,"score_spread":0.330805665155205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2183649514","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9781114,0.00039569443,0.0016770575,0.0051790536,0.000030751755,0.00014059665,0.00004384583,0.000024717085,0.014396849],"genre_scores_gemma":[0.9965838,0.00035130698,0.0010912248,0.00041941457,0.000007482736,0.000100366844,0.000030040497,0.0000097433685,0.0014066243],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9767667,0.010542175,0.0018648611,0.00096911256,0.0062263194,0.0036309105],"domain_scores_gemma":[0.9311788,0.04305472,0.008183189,0.001361338,0.012322221,0.0038997594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017838493,0.0002766201,0.00042704277,0.0022455372,0.00425569,0.006714951,0.0013098078,0.0018159274,0.006072553],"category_scores_gemma":[0.05948394,0.00059652433,0.00028672966,0.0026989935,0.002092473,0.0035771262,0.003185371,0.0022041616,0.00067141507],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006057387,0.0018114968,0.4019733,0.0015046141,0.00007265056,0.0023766777,0.31977883,0.0015046707,0.005520021,0.04605443,0.008982301,0.20981526],"study_design_scores_gemma":[0.00003014218,0.00044438144,0.25552973,0.0016636974,0.000050443276,0.000782597,0.66016084,0.003884495,0.0022921048,0.006475804,0.06857575,0.000109933906],"about_ca_topic_score_codex":0.012097376,"about_ca_topic_score_gemma":0.008874861,"teacher_disagreement_score":0.017838493,"about_ca_system_score_codex":0.005152391,"about_ca_system_score_gemma":0.00955637,"threshold_uncertainty_score":0.094340086},"labels":[],"label_agreement":null},{"id":"W2186564068","doi":"","title":"Virtual steel model concept for information and fabrication integration","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Engineering; Brace; Bracing; Connection (principal bundle); Construction engineering; Mechanical engineering; Computer science","score_opus":0.009074912286222139,"score_gpt":0.21383504171344803,"score_spread":0.20476012942722588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2186564068","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005878355,0.00030468943,0.9418896,0.00076398475,0.00036979644,0.00011570652,0.000108529355,0.0009745116,0.049594887],"genre_scores_gemma":[0.25060362,0.0008239518,0.71445924,0.00053261424,0.00013317693,0.0004946274,0.0005866755,0.00042943246,0.031936765],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99710387,0.00088264636,0.00015883725,0.00022292408,0.0014800383,0.00015166884],"domain_scores_gemma":[0.99848205,0.00046593588,0.00012220246,0.0005079736,0.00031021496,0.000111682486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001995174,0.001016812,0.00048774248,0.0012740283,0.0011021538,0.0039757728,0.0023073535,0.001824949,0.012006253],"category_scores_gemma":[0.00353089,0.0004891873,0.00088980485,0.0011719235,0.0022738858,0.0074280174,0.0040242304,0.0016138363,0.0024501896],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059859216,0.000050609444,0.00022376131,0.00015459042,0.000013833253,0.00025484493,0.0011862727,0.010082924,0.0043810797,0.89777887,0.006135148,0.07967824],"study_design_scores_gemma":[0.000050612085,0.00025324392,0.0003424074,0.00031086264,0.00006321583,0.0016448201,0.00091247185,0.11288136,0.011241062,0.32228243,0.54992956,0.000088001834],"about_ca_topic_score_codex":0.0015847777,"about_ca_topic_score_gemma":0.0017743321,"teacher_disagreement_score":0.012006253,"about_ca_system_score_codex":0.0013854627,"about_ca_system_score_gemma":0.0017876398,"threshold_uncertainty_score":0.040164888},"labels":[],"label_agreement":null},{"id":"W2187318879","doi":"10.14288/1.0076339","title":"BIM maturity assessment and certification in construction project team selection","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Maturity (psychological); Capability Maturity Model; Certification; Process management; Audit; Project team; Work (physics); Engineering management; Knowledge management; Engineering; Business; Computer science; Operations management","score_opus":0.012847876909424422,"score_gpt":0.19576829291534315,"score_spread":0.1829204160059187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187318879","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4761965,0.005058226,0.3331136,0.010784103,0.0010574878,0.0077655837,0.0007833408,0.0016246715,0.1636164],"genre_scores_gemma":[0.8471241,0.0009470046,0.1396732,0.00024685048,0.00006522523,0.0016020422,0.0006885831,0.00006897882,0.009584116],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97990817,0.0110556865,0.0014467235,0.0010286712,0.00541329,0.0011473745],"domain_scores_gemma":[0.96054363,0.012291708,0.0050317817,0.0018713273,0.01773808,0.0025235238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024879562,0.00044546337,0.00047159227,0.005107809,0.002027588,0.0040505677,0.001381672,0.001143645,0.0063115084],"category_scores_gemma":[0.051936634,0.00057079917,0.00049435295,0.0037913923,0.0009161753,0.004210069,0.004032154,0.0014869474,0.0017300196],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037765078,0.0010674055,0.08432803,0.0007839769,0.000042049847,0.0003906213,0.0110429125,0.006190195,0.002979936,0.020903843,0.018430449,0.8534629],"study_design_scores_gemma":[0.00032097363,0.0032748429,0.4055273,0.0056645735,0.0003081304,0.0017564152,0.079255305,0.16336145,0.024025984,0.05641269,0.25949237,0.00059993],"about_ca_topic_score_codex":0.006440164,"about_ca_topic_score_gemma":0.010815892,"teacher_disagreement_score":0.024879562,"about_ca_system_score_codex":0.0041825576,"about_ca_system_score_gemma":0.009915701,"threshold_uncertainty_score":0.13157725},"labels":[],"label_agreement":null},{"id":"W2187366549","doi":"10.7492/ijaec.2013.021","title":"A Simulation Based Decision Tool for Transportation of Ready Mixed Concrete","year":2013,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Operations research; Engineering","score_opus":0.00410180547691293,"score_gpt":0.20387069412581701,"score_spread":0.19976888864890407,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187366549","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0235792,0.00010622159,0.9624671,0.00014175088,0.000074066484,0.00021463448,0.0007548101,0.003892382,0.008769804],"genre_scores_gemma":[0.5085754,0.00040353872,0.47993973,0.00013752948,0.00002952635,0.0011484915,0.00122696,0.00052369304,0.008015168],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960226,0.00015042412,0.00002920399,0.000045384593,0.00013323166,0.000039591225],"domain_scores_gemma":[0.99924845,0.00053393026,0.000038293318,0.000039405848,0.00010144847,0.00003845075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086965534,0.000868333,0.0009005904,0.00076693494,0.00049346336,0.0009707286,0.0013612923,0.0011795892,0.009974997],"category_scores_gemma":[0.0016103666,0.00062521617,0.0009144542,0.00057196105,0.00044564472,0.0008104008,0.000721338,0.0009953371,0.0008861025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058177713,0.00004608626,0.00028082175,0.000054756354,0.000021343438,0.000062275314,0.00003502068,0.9829994,0.0015575892,0.0057902066,0.00061165285,0.008482618],"study_design_scores_gemma":[0.00001574141,0.00001197203,0.000034524703,0.000007288176,0.0000047863073,0.0000073268957,0.000004535476,0.99700695,0.0006036619,0.00091798214,0.0013803187,0.0000049412088],"about_ca_topic_score_codex":0.007006874,"about_ca_topic_score_gemma":0.005268941,"teacher_disagreement_score":0.009974997,"about_ca_system_score_codex":0.0009603099,"about_ca_system_score_gemma":0.0014556458,"threshold_uncertainty_score":0.03336966},"labels":[],"label_agreement":null},{"id":"W2187426288","doi":"","title":"Development of CAD-Spreadsheet integrated solution to Optimazing Site Grading Design for industrial Construction","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Engineering; Oil refinery; Solver; Civil engineering; Computer science; Waste management","score_opus":0.08398845623587482,"score_gpt":0.23091521601980478,"score_spread":0.14692675978392994,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2187426288","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009631002,0.000034397668,0.9816927,0.000041144285,0.00001604921,0.00014256405,0.00017809668,0.0033677316,0.0048963325],"genre_scores_gemma":[0.07705569,0.000112532456,0.91723186,0.000034879788,0.0000070108917,0.0003697202,0.00055057206,0.00054251513,0.004095297],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995678,0.000069283335,0.000031170097,0.00005160764,0.00024572658,0.00003431596],"domain_scores_gemma":[0.9993974,0.0002413837,0.000044202396,0.00006390392,0.00023034182,0.000022804057],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007996888,0.0010592676,0.0005998462,0.0007223805,0.000329597,0.0009782079,0.0015321238,0.000779026,0.009678623],"category_scores_gemma":[0.0017934856,0.0006595731,0.00067098776,0.00066624756,0.00024380238,0.0006494187,0.0005643457,0.00079619297,0.0016889266],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009148476,0.00020848309,0.001244598,0.00028145046,0.00004757777,0.00018576697,0.00022965138,0.6969306,0.018530747,0.009795086,0.005260065,0.26719445],"study_design_scores_gemma":[0.00004119191,0.00005728308,0.00029364522,0.000032802927,0.000014725842,0.00006622115,0.00003974488,0.97399455,0.012057982,0.0021752482,0.011208415,0.000018123015],"about_ca_topic_score_codex":0.003255077,"about_ca_topic_score_gemma":0.005082662,"teacher_disagreement_score":0.009678623,"about_ca_system_score_codex":0.00052445586,"about_ca_system_score_gemma":0.0012912281,"threshold_uncertainty_score":0.032378256},"labels":[],"label_agreement":null},{"id":"W2203773648","doi":"","title":"Adaptable effectiveness of industrialised building (IBS) in construction projects","year":2013,"lang":"en","type":"other","venue":"UMP Institutional Repository (Universiti Malaysia Pahang)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Construction waste; Construction management; Government (linguistics); Quality (philosophy); Productivity; Construction industry; Business; Engineering; Building construction; Construction engineering; Pre-construction services; Urban construction; Transport engineering; Civil engineering; Project management; Architectural engineering; Program management; Economic growth; Economics","score_opus":0.009042453486398011,"score_gpt":0.18433042970681118,"score_spread":0.17528797622041317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2203773648","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9718631,0.00020326264,0.0007856284,0.00013580183,0.0000053637928,0.00008371384,0.00004048909,0.000035321344,0.026847307],"genre_scores_gemma":[0.9971501,0.00015868747,0.0010978241,0.00001112164,0.0000018434577,0.000020896374,0.000024541303,0.000004051179,0.001530884],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99260664,0.004009361,0.00037042156,0.00027769024,0.0020886918,0.0006472412],"domain_scores_gemma":[0.99470997,0.0018321607,0.0013732971,0.00050605455,0.0009374778,0.0006411225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00426985,0.00030906088,0.00019889353,0.0016475839,0.0006849859,0.001763098,0.00073122943,0.00037607944,0.004164241],"category_scores_gemma":[0.008683527,0.00020164147,0.00030962448,0.0012775218,0.000950279,0.0010381052,0.0028779267,0.00032947763,0.00031588197],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037312973,0.0018328661,0.4367372,0.0013380843,0.0001360735,0.0013344078,0.041615956,0.007014739,0.010180109,0.00659068,0.002088475,0.4907583],"study_design_scores_gemma":[0.00002142217,0.0013785026,0.92459244,0.00035301797,0.00007156834,0.0004716277,0.04789784,0.0024732258,0.002532745,0.00088672485,0.01927696,0.000043880133],"about_ca_topic_score_codex":0.0031705662,"about_ca_topic_score_gemma":0.008736732,"teacher_disagreement_score":0.00426985,"about_ca_system_score_codex":0.0015664904,"about_ca_system_score_gemma":0.0012749765,"threshold_uncertainty_score":0.022581398},"labels":[],"label_agreement":null},{"id":"W222089776","doi":"","title":"Windsor Regional Construction Traffic Management System","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Windsor; Transport engineering; Government (linguistics); Gateway (web page); Relocation; Business; Service (business); Engineering; Environmental planning; Computer science; Geography","score_opus":0.010229224694275531,"score_gpt":0.1723563698603275,"score_spread":0.16212714516605198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W222089776","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035589855,0.0005015751,0.05449879,0.0013032892,0.00031542368,0.002398482,0.11559939,0.08318478,0.7066083],"genre_scores_gemma":[0.22967395,0.00092065,0.06338428,0.0003511409,0.0002131739,0.001947916,0.29944876,0.0032350495,0.40082514],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985819,0.00013926454,0.000121024204,0.00030000953,0.0006866386,0.00017118972],"domain_scores_gemma":[0.99832135,0.000065931905,0.0001485161,0.00029354327,0.0010296454,0.00014096883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019272335,0.00079022924,0.0006053818,0.0024398214,0.0016818325,0.0025437798,0.0012542598,0.00052470964,0.065839835],"category_scores_gemma":[0.0020526797,0.0004223432,0.00026795478,0.0027806105,0.00028069734,0.0009980054,0.0011646448,0.00045022502,0.0362664],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005728139,0.00014511027,0.019402113,0.00015546696,0.00004349541,0.00012487607,0.0005621932,0.004720038,0.003291256,0.007947726,0.6813635,0.2816714],"study_design_scores_gemma":[0.00007926987,0.000066569286,0.012513445,0.000049495993,0.00001953877,0.000054854205,0.00018990046,0.01659594,0.002064805,0.000627361,0.96767545,0.00006345298],"about_ca_topic_score_codex":0.26395306,"about_ca_topic_score_gemma":0.29449213,"teacher_disagreement_score":0.7360469,"about_ca_system_score_codex":0.003926925,"about_ca_system_score_gemma":0.0069585345,"threshold_uncertainty_score":0.5248333},"labels":[],"label_agreement":null},{"id":"W2233210616","doi":"","title":"An Integrated Condition Assessment Model for Educational Buildings Using BIM","year":2012,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Analytic hierarchy process; Building information modeling; Process (computing); Facility management; Asset (computer security); Engineering; Service (business); Asset management; Architectural engineering; Quality (philosophy); Computer science; Civil engineering; Risk analysis (engineering); Operations research; Business; Operations management","score_opus":0.030671734693819088,"score_gpt":0.3184123173711249,"score_spread":0.28774058267730585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2233210616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05998292,0.00019987412,0.9236726,0.00029698285,0.00003792675,0.00023460858,0.00045796364,0.0006317871,0.014485346],"genre_scores_gemma":[0.8246779,0.0003652566,0.16774318,0.00005273761,0.000021946642,0.00068261824,0.00061711017,0.000052912015,0.0057862583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992335,0.00022029104,0.000058822057,0.00016004704,0.00023253507,0.00009480194],"domain_scores_gemma":[0.9993319,0.0002813568,0.00009239029,0.000029532555,0.00022382506,0.00004090913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013340471,0.0007962032,0.0006671717,0.0015591704,0.00072088133,0.002781232,0.0016591477,0.001350016,0.0036611247],"category_scores_gemma":[0.002253784,0.0005483517,0.0011938069,0.0013963291,0.0005648402,0.0019445679,0.0014859013,0.0007478469,0.00047402756],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018673263,0.00004010786,0.0011262902,0.00002789955,0.000012980585,0.000061177314,0.0000839405,0.9806157,0.00039487763,0.006239437,0.0002396347,0.011139316],"study_design_scores_gemma":[0.0000026315702,0.000010458966,0.00018440429,0.0000046108657,0.0000065027407,0.000010189663,0.000026792271,0.99798137,0.000085880354,0.001311642,0.00037070713,0.0000047869257],"about_ca_topic_score_codex":0.020603037,"about_ca_topic_score_gemma":0.014570312,"teacher_disagreement_score":0.020603037,"about_ca_system_score_codex":0.0021475898,"about_ca_system_score_gemma":0.002019155,"threshold_uncertainty_score":0.040966213},"labels":[],"label_agreement":null},{"id":"W2234801407","doi":"","title":"BIM, tendances actuelles et grands enjeux au Québec et de par le monde","year":2011,"lang":"fr","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science","score_opus":0.023970456719550687,"score_gpt":0.2400100662235302,"score_spread":0.2160396095039795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2234801407","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41000277,0.017614728,0.044722453,0.02495189,0.00084110006,0.00016661725,0.011766845,0.0013801224,0.48855343],"genre_scores_gemma":[0.73584414,0.0048203184,0.023670126,0.00044188742,0.000058276484,0.00007538042,0.0029614777,0.00026096893,0.23186743],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99812037,0.0002583801,0.000067668225,0.00023920242,0.0011049353,0.00020946581],"domain_scores_gemma":[0.99818027,0.00018578341,0.00014885639,0.000109945664,0.0011469808,0.00022824264],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016395538,0.0006713012,0.00035106187,0.00391049,0.0050043617,0.005684341,0.000922355,0.00072666095,0.016302295],"category_scores_gemma":[0.003997678,0.00043440537,0.00031770955,0.007821493,0.0026812828,0.0023639186,0.0020197462,0.0013642417,0.0010777772],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026549274,0.00013389696,0.06808138,0.00039411368,0.00008562845,0.0007627099,0.018725343,0.010970214,0.0036884437,0.35434422,0.08465666,0.45789185],"study_design_scores_gemma":[0.00001666547,0.000049574395,0.19749339,0.00043696107,0.000049856928,0.0004272814,0.01806467,0.0095465435,0.0015356818,0.015853567,0.75639176,0.00013394459],"about_ca_topic_score_codex":0.97986984,"about_ca_topic_score_gemma":0.98849213,"teacher_disagreement_score":0.9576617,"about_ca_system_score_codex":0.042338297,"about_ca_system_score_gemma":0.030508133,"threshold_uncertainty_score":0.30718726},"labels":[],"label_agreement":null},{"id":"W2242924137","doi":"","title":"Cash flow optimization and visualization of residence housing for builders","year":2013,"lang":"en","type":"article","venue":"Deakin Research Online (Deakin University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Cash flow; Cash flow forecasting; Net present value; Visualization; Computer science; Discounted cash flow; Cash; Operations research; Payment; Procurement; Finance; Business; Engineering; Production (economics); Economics; Marketing","score_opus":0.036739221024255524,"score_gpt":0.2950364268264285,"score_spread":0.25829720580217297,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2242924137","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47908375,0.00092514197,0.47735715,0.0011384799,0.00010285916,0.00025057868,0.0015354007,0.005847775,0.033758797],"genre_scores_gemma":[0.8325476,0.0004842441,0.16220929,0.000029659359,0.000018671293,0.00009444116,0.0003629921,0.0001335334,0.004119542],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998423,0.00005589319,0.000007579724,0.000024521587,0.00004511208,0.000024537445],"domain_scores_gemma":[0.9997131,0.00014960398,0.000034649398,0.00001947336,0.000061471874,0.000021636582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050742517,0.0007023511,0.00030043986,0.0013567719,0.00041120473,0.0013145374,0.0003634525,0.00042051688,0.0046205204],"category_scores_gemma":[0.0011095142,0.00018851415,0.0003882056,0.0007793263,0.00024986136,0.00061101554,0.0005446167,0.00028326883,0.00023350136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00087858236,0.00021509039,0.011377549,0.00048128984,0.000054796255,0.0009261626,0.0024425301,0.6284491,0.041207373,0.02639704,0.008591149,0.27897936],"study_design_scores_gemma":[0.000032833384,0.000105881176,0.006015328,0.000057609384,0.00002523711,0.000113532406,0.0006278636,0.9666334,0.01204062,0.004911668,0.00938526,0.000050798713],"about_ca_topic_score_codex":0.008661529,"about_ca_topic_score_gemma":0.009349555,"teacher_disagreement_score":0.008661529,"about_ca_system_score_codex":0.00068277353,"about_ca_system_score_gemma":0.00082528783,"threshold_uncertainty_score":0.017222226},"labels":[],"label_agreement":null},{"id":"W2243253930","doi":"","title":"Creation of an Evolutive Conceptual Know-how Framework for Integrative Building Design","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université de Montréal","funders":"","keywords":"Multidisciplinary approach; Building information modeling; Process management; Knowledge management; Productivity; Process (computing); Conceptual framework; Building design; Sustainable design; Computer science; Engineering; Engineering management; Architectural engineering; Sustainability; Operations management; Sociology","score_opus":0.03384762083512895,"score_gpt":0.254374445830927,"score_spread":0.22052682499579807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2243253930","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032815847,0.00094628055,0.9364035,0.004388353,0.00016928687,0.00032759423,0.000115996394,0.00017885354,0.05418859],"genre_scores_gemma":[0.08772588,0.0010811206,0.90484285,0.0005325796,0.00006730482,0.00096711796,0.00026282208,0.00011062917,0.004409656],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9946826,0.0031480044,0.00035346812,0.00065682456,0.0008120309,0.00034711405],"domain_scores_gemma":[0.9955989,0.0021373872,0.00033720603,0.000801111,0.00075450586,0.00037084532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011792803,0.0013198089,0.0011522735,0.0055091437,0.00417583,0.012051314,0.005852984,0.004758557,0.0050763893],"category_scores_gemma":[0.0074538914,0.0010474594,0.0026562575,0.0037680888,0.015952308,0.014765902,0.00942775,0.0064495876,0.0012132423],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000412743,0.000018202465,0.00017525443,0.00006775205,0.0000087440385,0.000102397906,0.0025109907,0.002704393,0.00012939137,0.9848968,0.0005977438,0.00878426],"study_design_scores_gemma":[0.000013197639,0.00002240199,0.0002419775,0.00045894086,0.000027148943,0.00025820176,0.0023158207,0.013588602,0.00032658287,0.8631424,0.11956643,0.000038271068],"about_ca_topic_score_codex":0.005507383,"about_ca_topic_score_gemma":0.0064644725,"teacher_disagreement_score":0.012051314,"about_ca_system_score_codex":0.0064601195,"about_ca_system_score_gemma":0.0077181356,"threshold_uncertainty_score":0.06236708},"labels":[],"label_agreement":null},{"id":"W2245927609","doi":"10.18260/1-2--6135","title":"Interactive And Immersive Training In A Virtual Environment For Construction Students","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Division of Undergraduate Education","keywords":"Government (linguistics); Bridge (graph theory); Session (web analytics); Construction industry; Training (meteorology); Construction site safety; Work (physics); Tower; Engineering; Forensic engineering; Business; Civil engineering; Construction engineering; Medicine; Advertising; Geography; Mechanical engineering","score_opus":0.012794977955970252,"score_gpt":0.21926296224996975,"score_spread":0.20646798429399948,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2245927609","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43705222,0.003280407,0.22959886,0.0068708137,0.005690344,0.00261799,0.007929335,0.020859392,0.28610072],"genre_scores_gemma":[0.5873984,0.003397536,0.22776009,0.0019124477,0.0013540925,0.0046279896,0.0052718483,0.0017950123,0.16648254],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997793,0.00008599939,0.000010826836,0.00002731373,0.000054980694,0.00004164791],"domain_scores_gemma":[0.99923205,0.00040218403,0.000022505572,0.00005339543,0.00004654124,0.00024324756],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007912747,0.00065388,0.0003415589,0.00050693325,0.00035961423,0.0012297736,0.0009827253,0.00063967955,0.086678036],"category_scores_gemma":[0.0016598665,0.00016245859,0.0005866175,0.00024407964,0.00023420325,0.00092941424,0.003033885,0.00068373134,0.011003708],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001015757,0.00251255,0.0029160047,0.0013587789,0.00005268291,0.0012337595,0.0034440109,0.0029856053,0.021843417,0.0022075612,0.29271656,0.6677132],"study_design_scores_gemma":[0.0008977569,0.0061189625,0.040566597,0.0013943511,0.00016834226,0.0032704675,0.00465032,0.024890177,0.012974838,0.007243332,0.8974848,0.00033997765],"about_ca_topic_score_codex":0.00014690874,"about_ca_topic_score_gemma":0.00049515045,"teacher_disagreement_score":0.086678036,"about_ca_system_score_codex":0.00012718607,"about_ca_system_score_gemma":0.00030727603,"threshold_uncertainty_score":0.28996688},"labels":[],"label_agreement":null},{"id":"W2247240453","doi":"","title":"Housing construction analysis in Olivette Park, East St. Louis","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"St louis; Quarter (Canadian coin); Work (physics); East coast; Geography; Politics; Economy; History; Political science; Archaeology; Engineering; Economics","score_opus":0.0076686785309680915,"score_gpt":0.1905302428098452,"score_spread":0.18286156427887712,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2247240453","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966543,0.000047007183,0.00009252049,0.000020609332,6.320792e-7,0.000006557479,0.00049891387,0.0000033872711,0.0026761265],"genre_scores_gemma":[0.9929997,0.00011812533,0.00036783106,0.000011547895,0.0000013655097,0.000008737199,0.0013208892,0.0000036785386,0.0051681576],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998859,0.000011528491,0.000005076652,0.000017450102,0.000051933283,0.000027982527],"domain_scores_gemma":[0.9998535,0.000014334965,0.000036486348,0.000007970245,0.000066168686,0.000021497794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010357947,0.00008131552,0.00005994769,0.0009814944,0.0005031166,0.00035423232,0.00015168781,0.00009552525,0.0019250518],"category_scores_gemma":[0.00021511139,0.00009269501,0.00008834579,0.0010989127,0.00022649851,0.00015588809,0.00037541514,0.0001248937,0.00027097293],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007149987,0.00004564106,0.95748705,0.00003871741,0.000019783256,0.00046882467,0.003231677,0.0007350333,0.0037595334,0.0004232405,0.0017453552,0.031973697],"study_design_scores_gemma":[0.0000010860604,0.00003155288,0.9918568,0.000009073391,0.000003830618,0.00011091023,0.002351201,0.0003520091,0.0006801187,0.00002038445,0.004580217,0.0000027662174],"about_ca_topic_score_codex":0.21810758,"about_ca_topic_score_gemma":0.72544193,"teacher_disagreement_score":0.21810758,"about_ca_system_score_codex":0.00140753,"about_ca_system_score_gemma":0.0008214312,"threshold_uncertainty_score":0.43367612},"labels":[],"label_agreement":null},{"id":"W2255928510","doi":"","title":"A Strategy For Collecting And Evaluating Information On Engineering Consultant Offices Using Neural Networks: A Case Study","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Standardization; Artificial neural network; Computer science; Process (computing); Field (mathematics); The Internet; Software engineering; Interface (matter); Information engineering; Information system; Artificial intelligence; Engineering management; Engineering; World Wide Web","score_opus":0.02475945567403902,"score_gpt":0.26877695228378196,"score_spread":0.24401749660974292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2255928510","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7321902,0.00058361306,0.22245705,0.0033860884,0.00007003203,0.0024412782,0.00073764665,0.00082808477,0.037306007],"genre_scores_gemma":[0.6929254,0.0003505406,0.29913783,0.00035009795,0.000042174994,0.0005486555,0.0004386863,0.00007584639,0.006130793],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98353875,0.0103707025,0.00079824467,0.00090108236,0.00374518,0.0006460057],"domain_scores_gemma":[0.98119074,0.009585404,0.0013143223,0.0016099028,0.00549354,0.00080600963],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008707971,0.0007282659,0.0005835273,0.0052886386,0.0023876217,0.0023547648,0.0016969717,0.0019717868,0.0023996604],"category_scores_gemma":[0.018689303,0.00049559714,0.0005858048,0.0037604836,0.00095404376,0.003123993,0.0019218881,0.0010534233,0.00058747944],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013532417,0.005200464,0.093632236,0.0008335789,0.00023645179,0.009225192,0.017929772,0.06594157,0.02043566,0.029879468,0.015351273,0.73998106],"study_design_scores_gemma":[0.0005600119,0.00469255,0.064200096,0.0008222179,0.0004442438,0.0052501014,0.062944,0.66280735,0.09163162,0.017874267,0.08811398,0.00065957464],"about_ca_topic_score_codex":0.014336518,"about_ca_topic_score_gemma":0.025706101,"teacher_disagreement_score":0.014336518,"about_ca_system_score_codex":0.004056306,"about_ca_system_score_gemma":0.003233849,"threshold_uncertainty_score":0.046052694},"labels":[],"label_agreement":null},{"id":"W2260725742","doi":"10.14288/1.0074315","title":"Construction waste management at source : a Building Information Modeling based system dynamic approach","year":2013,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Information system; System dynamics; Computer science; Construction engineering; Risk analysis (engineering); Architectural engineering; Business; Systems engineering; Engineering; Artificial intelligence","score_opus":0.0031605070534608958,"score_gpt":0.12849298908018453,"score_spread":0.12533248202672362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2260725742","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043446742,0.0009490003,0.9277036,0.001304226,0.0000743935,0.00020809824,0.00073732145,0.0010802147,0.024496347],"genre_scores_gemma":[0.6965736,0.0017467121,0.29220313,0.00016685246,0.00005736609,0.0005791191,0.0012172771,0.00013431185,0.0073216343],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965715,0.000109666624,0.00001942501,0.00006177861,0.000109508284,0.00004240899],"domain_scores_gemma":[0.9996364,0.0001956504,0.00003746034,0.000019924373,0.00008463616,0.000026006785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060005207,0.0008129985,0.00064900727,0.0010893937,0.0006817517,0.0025157114,0.0012749685,0.0012001701,0.0032918577],"category_scores_gemma":[0.00095634814,0.0005057614,0.0011552882,0.0012448499,0.00042113572,0.001396939,0.0013529808,0.0010950676,0.00045140745],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002391232,0.00005182731,0.0010793619,0.000092536335,0.000049109745,0.00010117956,0.00018410842,0.9586619,0.00095866085,0.016857306,0.0008809159,0.021059064],"study_design_scores_gemma":[0.0000028989139,0.000009803635,0.00014979177,0.000011774856,0.000012433359,0.000009835878,0.000057282647,0.99440104,0.0001454584,0.0032619159,0.001931386,0.00000638561],"about_ca_topic_score_codex":0.021226604,"about_ca_topic_score_gemma":0.018006895,"teacher_disagreement_score":0.021226604,"about_ca_system_score_codex":0.0017470954,"about_ca_system_score_gemma":0.0017201337,"threshold_uncertainty_score":0.04220611},"labels":[],"label_agreement":null},{"id":"W2263281101","doi":"","title":"Business Model for BIM-based Services","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Business; Process management; Process (computing); Business process; Business model; Industrialization of services business model; Knowledge management; Marketing; Business process modeling; Engineering; Operations management; Computer science; Work in process","score_opus":0.007985104225038914,"score_gpt":0.18328671077335645,"score_spread":0.17530160654831753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2263281101","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077844933,0.0009580859,0.61440575,0.013057986,0.0006787881,0.0009906978,0.00059764984,0.0015607885,0.35996586],"genre_scores_gemma":[0.29664788,0.0023710374,0.5658338,0.0042058416,0.00048797156,0.0025305024,0.0025646675,0.0007473739,0.12461083],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9950075,0.0016100743,0.00031797963,0.00044157755,0.002219897,0.0004029019],"domain_scores_gemma":[0.99814093,0.00057555607,0.00013285862,0.00027600687,0.0006017872,0.00027281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033453957,0.0010754102,0.00052164897,0.0030016364,0.002366733,0.009686414,0.002749052,0.0052913106,0.017495872],"category_scores_gemma":[0.004787236,0.00064387335,0.0016004073,0.0028822387,0.0023128,0.007651639,0.004192665,0.003327124,0.011384801],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019226993,0.0000657102,0.00023022796,0.000060099457,0.000011794141,0.0003967637,0.00029384016,0.004238253,0.0008692703,0.9669348,0.009202504,0.017677544],"study_design_scores_gemma":[0.000058190322,0.000064768574,0.00030000368,0.00026281129,0.000030096064,0.0013870739,0.0006680145,0.075022064,0.0018229388,0.37612686,0.5441852,0.00007183943],"about_ca_topic_score_codex":0.004254199,"about_ca_topic_score_gemma":0.0024535754,"teacher_disagreement_score":0.017495872,"about_ca_system_score_codex":0.004007171,"about_ca_system_score_gemma":0.004233903,"threshold_uncertainty_score":0.058529496},"labels":[],"label_agreement":null},{"id":"W2263603748","doi":"10.2495/bim150201","title":"Streamlining Building Information Model creation using Agile project management","year":2015,"lang":"en","type":"article","venue":"WIT transactions on the built environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Agile software development; Process management; Systems engineering; Project management; Application lifecycle management; Computer science; Product lifecycle; Engineering management; Knowledge management; Engineering; New product development; Software; Software engineering; Operations management; Business","score_opus":0.03142618444686427,"score_gpt":0.22735728310884212,"score_spread":0.19593109866197786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2263603748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010887922,0.000040350275,0.9858343,0.00007819434,0.000021992653,0.00017386184,0.00003770443,0.0010828493,0.0018427926],"genre_scores_gemma":[0.062586114,0.00008441237,0.93554145,0.00003082876,0.0000063907705,0.00019095364,0.00016695299,0.00029111095,0.0011017658],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99659073,0.0012252645,0.00023879507,0.0004464978,0.0012553637,0.00024338714],"domain_scores_gemma":[0.99186486,0.0024653582,0.00048381477,0.0033770418,0.0015255454,0.00028335414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045662825,0.0009859768,0.00069938053,0.0013696913,0.0006802194,0.0025239836,0.0016528505,0.0007930551,0.0033031271],"category_scores_gemma":[0.010689057,0.0013210023,0.0008524404,0.0010935882,0.00079796073,0.0026475654,0.004156974,0.001967327,0.0013219115],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016806439,0.00040258843,0.0037865464,0.00038789064,0.00009797221,0.00045085017,0.0037363835,0.19078937,0.048556603,0.026522953,0.0056606876,0.7194401],"study_design_scores_gemma":[0.000096660515,0.00021522521,0.0010862328,0.0001452518,0.000055408298,0.0004997883,0.00097051985,0.88968664,0.04148642,0.021747265,0.043910258,0.00010027312],"about_ca_topic_score_codex":0.0020986623,"about_ca_topic_score_gemma":0.003504564,"teacher_disagreement_score":0.0045662825,"about_ca_system_score_codex":0.00069881557,"about_ca_system_score_gemma":0.0020782195,"threshold_uncertainty_score":0.02414912},"labels":[],"label_agreement":null},{"id":"W2264686095","doi":"","title":"IT And Systemic Approach For Managing Sustainable Urban Infrastructure Rehabilitation","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Asset (computer security); Process management; Task (project management); Risk analysis (engineering); Process (computing); Computer science; Sustainability; Asset management; Business; Engineering; Computer security; Systems engineering","score_opus":0.005180981412948721,"score_gpt":0.20287718776690375,"score_spread":0.19769620635395502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264686095","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011517685,0.0016909642,0.9027086,0.0060010375,0.00014166239,0.00021736474,0.0001320339,0.00036527525,0.07722541],"genre_scores_gemma":[0.6363108,0.0034409163,0.333706,0.00074895436,0.00021134072,0.0006197904,0.00027053288,0.00008506954,0.024606546],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99805945,0.00086313934,0.000117139854,0.00025168207,0.00054354,0.00016500143],"domain_scores_gemma":[0.9991806,0.00027806914,0.00012381065,0.000095715164,0.00021024879,0.00011157862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021172513,0.000671537,0.0004414372,0.0017283289,0.0011410019,0.005668529,0.0012461732,0.0014469485,0.0037604375],"category_scores_gemma":[0.001448963,0.00033867886,0.0007770786,0.0018417088,0.003247666,0.0038416132,0.0024117345,0.0013612263,0.00045869598],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001611068,0.00006648708,0.001243535,0.00025452272,0.000052030467,0.00028734683,0.001149696,0.046482768,0.0014317404,0.8858114,0.003636815,0.059567574],"study_design_scores_gemma":[0.000032609216,0.00017805632,0.0011857054,0.0003327906,0.0001007494,0.00027866472,0.00259194,0.17678423,0.0015572677,0.675635,0.14126033,0.00006261922],"about_ca_topic_score_codex":0.00470732,"about_ca_topic_score_gemma":0.004616585,"teacher_disagreement_score":0.005668529,"about_ca_system_score_codex":0.0039954837,"about_ca_system_score_gemma":0.005973551,"threshold_uncertainty_score":0.028989375},"labels":[],"label_agreement":null},{"id":"W2264919365","doi":"","title":"An Enhanced Scheduling Technique for Modular Construction Manufacturing","year":2014,"lang":"en","type":"article","venue":"22nd Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Lean manufacturing; Manufacturing engineering; Advanced manufacturing; Lean project management; Manufacturing; Scheduling (production processes); Engineering; Computer science; Operations management; Business","score_opus":0.010165625758298496,"score_gpt":0.2254929933385704,"score_spread":0.2153273675802719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2264919365","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011255937,0.00008236731,0.9848728,0.000042603784,0.00007750646,0.000058236303,0.000021574575,0.00046450316,0.0031243672],"genre_scores_gemma":[0.25516394,0.00016870868,0.73979425,0.000059450027,0.00009558066,0.00008380231,0.00010469008,0.00017395387,0.0043555605],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946815,0.000099727804,0.000029225088,0.000101527694,0.00023426082,0.00006714585],"domain_scores_gemma":[0.9995024,0.00013576593,0.0000777333,0.00011996211,0.0001250174,0.000039164745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006028782,0.0004986592,0.00036931035,0.00059186626,0.00048238505,0.0003794446,0.00080541946,0.00029970834,0.0031591288],"category_scores_gemma":[0.0011082877,0.00021933769,0.0005885908,0.0007579217,0.000406446,0.00053670723,0.0007310006,0.00076443155,0.0007376113],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004142213,0.00024421452,0.0010043556,0.0002511482,0.000043849963,0.00036371348,0.00031736298,0.25831014,0.18628383,0.06671826,0.0038453988,0.48220345],"study_design_scores_gemma":[0.000065204615,0.0004891356,0.0009776929,0.000029584618,0.00004387536,0.00044673576,0.000068762034,0.87561023,0.06552236,0.018359125,0.03834318,0.000044070068],"about_ca_topic_score_codex":0.0014003622,"about_ca_topic_score_gemma":0.0019166981,"teacher_disagreement_score":0.0031591288,"about_ca_system_score_codex":0.0005043754,"about_ca_system_score_gemma":0.0010007517,"threshold_uncertainty_score":0.01056838},"labels":[],"label_agreement":null},{"id":"W2266839731","doi":"","title":"Using Interactive Workspaces for Team Design Project Meetings","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Workspace; Context (archaeology); Quality (philosophy); Work (physics); Sustainability; Project team; Knowledge management; Computer science; Engineering management; Engineering","score_opus":0.04143388139701694,"score_gpt":0.2939929762028603,"score_spread":0.2525590948058434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266839731","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22377774,0.0012487327,0.7208028,0.0009881048,0.00026958776,0.0011991573,0.00032838236,0.007343851,0.044041578],"genre_scores_gemma":[0.51426935,0.0005923215,0.47641703,0.0001292154,0.00013053525,0.0014402963,0.00055695325,0.0005565763,0.0059078056],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98706985,0.009576072,0.0004922633,0.0009037605,0.0012491171,0.0007090052],"domain_scores_gemma":[0.9710773,0.018699018,0.0014985816,0.0059126397,0.0010952874,0.001717137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011811172,0.0011806311,0.0006610948,0.0032020388,0.0020597489,0.0054632267,0.0033008123,0.0011744301,0.011634809],"category_scores_gemma":[0.024321267,0.0007754904,0.0010561454,0.0019915323,0.0012791728,0.005041248,0.007702762,0.0011765491,0.0030279458],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015785301,0.0021609205,0.0076461867,0.0013652886,0.00015278037,0.0018143222,0.04184538,0.015694764,0.024533251,0.024468118,0.013057098,0.8656833],"study_design_scores_gemma":[0.0032390296,0.011226903,0.017953897,0.0039849333,0.0006451262,0.005789391,0.048801985,0.08620391,0.069773436,0.078261614,0.67319775,0.0009220063],"about_ca_topic_score_codex":0.00049866945,"about_ca_topic_score_gemma":0.00086584454,"teacher_disagreement_score":0.011811172,"about_ca_system_score_codex":0.00072026876,"about_ca_system_score_gemma":0.0016243082,"threshold_uncertainty_score":0.062464178},"labels":[],"label_agreement":null},{"id":"W2266859455","doi":"10.1007/978-3-319-07977-6_20","title":"Interoperable ICT Platform for Energy Efficient Smart Buildings","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Building automation; Energy consumption; Systems engineering; Efficient energy use; Information and Communications Technology; Engineering; Scope (computer science); Architectural engineering; Renewable energy; Automation; Architecture; Building information modeling; Computer science; Operations management; World Wide Web; Mechanical engineering","score_opus":0.009561186734784682,"score_gpt":0.18054105310410862,"score_spread":0.17097986636932394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2266859455","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0043047485,0.01700413,0.21714206,0.0021457574,0.0019839827,0.0000884714,0.00046041122,0.0011281265,0.7557423],"genre_scores_gemma":[0.07246407,0.041313987,0.13682601,0.0011309027,0.0006159953,0.00018492313,0.002402578,0.00091303966,0.7441485],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999706,0.000035231467,0.0000112864345,0.000028159298,0.0001888253,0.000030545212],"domain_scores_gemma":[0.9999318,0.000019303865,0.0000033551778,0.000016841917,0.000021583603,0.000007181794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003226213,0.00079063367,0.0003525201,0.00088304834,0.0005660386,0.0032504592,0.00094033487,0.0011022981,0.01657027],"category_scores_gemma":[0.0002952444,0.00034620278,0.00034456054,0.0019529504,0.00058694434,0.0042924816,0.0023416413,0.0016176277,0.006228091],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000107507885,0.000043286367,0.000062769985,0.00022819986,0.000009885002,0.00012689467,0.0003700808,0.0045864787,0.0033312687,0.6830365,0.056362707,0.2518312],"study_design_scores_gemma":[0.0000019895333,0.00000785894,0.00013732658,0.00019938088,0.0000066751977,0.00017431639,0.00019737627,0.003861384,0.0021016526,0.078435205,0.91486657,0.000010246344],"about_ca_topic_score_codex":0.0015557277,"about_ca_topic_score_gemma":0.002745325,"teacher_disagreement_score":0.01657027,"about_ca_system_score_codex":0.0009586095,"about_ca_system_score_gemma":0.0009735651,"threshold_uncertainty_score":0.055433095},"labels":[],"label_agreement":null},{"id":"W2267552416","doi":"","title":"Spatio-Temporal Representation And Analysis In Infrastructure Systems","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Bridge (graph theory); Computer science; Visualization; Representation (politics); Data science; Data mining; Artificial intelligence","score_opus":0.004305465751746044,"score_gpt":0.19980798662286553,"score_spread":0.1955025208711195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2267552416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032244187,0.000668413,0.9560488,0.00027439737,0.000022930551,0.0000421408,0.00026802896,0.00083511637,0.009595905],"genre_scores_gemma":[0.5906257,0.0013859762,0.40220296,0.000049329086,0.000036065365,0.00019683802,0.0006968405,0.00014686676,0.004659367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957746,0.00016518321,0.00003212506,0.000046588513,0.00014253391,0.000036028494],"domain_scores_gemma":[0.9995741,0.00022367208,0.000059572296,0.000058082805,0.00006476695,0.000019687397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055519777,0.00038837403,0.00027475547,0.0017626323,0.00037158604,0.0019002968,0.00054090406,0.000519369,0.0032118384],"category_scores_gemma":[0.0017252031,0.0002707369,0.0005957641,0.0016950801,0.0007340022,0.0017848101,0.00090988225,0.00037656553,0.0004325742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007704099,0.000050030987,0.0028893321,0.00016376331,0.000044544933,0.00039812576,0.0012819108,0.5677111,0.0075540193,0.31043926,0.002735252,0.10665555],"study_design_scores_gemma":[0.000005856636,0.000012100147,0.0006823101,0.00002343202,0.000010836566,0.000096806216,0.00027049647,0.9210064,0.0018797191,0.063961074,0.012035853,0.00001512732],"about_ca_topic_score_codex":0.009753129,"about_ca_topic_score_gemma":0.004568902,"teacher_disagreement_score":0.009753129,"about_ca_system_score_codex":0.0009530504,"about_ca_system_score_gemma":0.0007227069,"threshold_uncertainty_score":0.019392729},"labels":[],"label_agreement":null},{"id":"W2268437379","doi":"","title":"Engineering Analysis With Uncertainties And Complexities, Using Reasoning Approaches","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Leverage (statistics); Computer science; Constraint (computer-aided design); Engineering design process; Qualitative reasoning; Domain (mathematical analysis); Interval arithmetic; Computation; Artificial intelligence; Mathematics; Engineering; Algorithm","score_opus":0.01765781039109354,"score_gpt":0.17184963734792275,"score_spread":0.1541918269568292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2268437379","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012698303,0.00077336474,0.9915057,0.0007124696,0.000048918773,0.000061306186,0.00003363315,0.00013027166,0.0054644705],"genre_scores_gemma":[0.05274349,0.0020090926,0.9424007,0.0002233852,0.00017732116,0.00023708085,0.00011854217,0.00008023925,0.0020101343],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9905625,0.0038426223,0.0008560924,0.001169313,0.0033421263,0.00022738142],"domain_scores_gemma":[0.9873374,0.00906986,0.00071566,0.0017220444,0.0009836535,0.00017148195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012031421,0.002235884,0.0015866056,0.0038949281,0.0020473318,0.010535606,0.0040709516,0.0019429374,0.0052545704],"category_scores_gemma":[0.019437233,0.001012035,0.003278681,0.0024981033,0.009105257,0.01139914,0.0054747425,0.0035832159,0.0013805783],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002262605,0.000030608844,0.00030580847,0.0005063831,0.00011120589,0.00020046729,0.0011078876,0.057672445,0.00082831236,0.87545955,0.0014505351,0.062304188],"study_design_scores_gemma":[0.000013813468,0.000013269114,0.0000697021,0.00018620247,0.00003354524,0.00007827213,0.00022307206,0.05467955,0.0005978843,0.926191,0.017884698,0.000029027247],"about_ca_topic_score_codex":0.0031100546,"about_ca_topic_score_gemma":0.002578101,"teacher_disagreement_score":0.012031421,"about_ca_system_score_codex":0.0025665653,"about_ca_system_score_gemma":0.003793398,"threshold_uncertainty_score":0.06362897},"labels":[],"label_agreement":null},{"id":"W2271222151","doi":"","title":"Evaluation of a case-based Reasoning Energy Prediction Tool for Commercial Buildings","year":2013,"lang":"en","type":"article","venue":"OakTrust (Texas A&M University Libraries)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Case-based reasoning; Artificial intelligence","score_opus":0.012215117525635952,"score_gpt":0.18299563406142805,"score_spread":0.1707805165357921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2271222151","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6005173,0.00023795385,0.35908237,0.0008476556,0.00012139297,0.0011545146,0.0027226727,0.01655617,0.018759985],"genre_scores_gemma":[0.7591428,0.00013269123,0.23589002,0.00006224667,0.000012685481,0.00020254677,0.0018784563,0.00013477862,0.0025436485],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908686,0.00031225284,0.00007548251,0.00014264925,0.00033190552,0.000050763727],"domain_scores_gemma":[0.99593794,0.0027707845,0.00015248248,0.000355338,0.00067563227,0.000107815926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023386914,0.0008971294,0.00044719884,0.001574023,0.00052011904,0.0014317136,0.0016398779,0.0010284455,0.0065658973],"category_scores_gemma":[0.0076139076,0.00036036476,0.00057631504,0.0010492902,0.00034038766,0.0013615283,0.0006092083,0.00056616106,0.0009213788],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008816792,0.001446722,0.01090378,0.0003143994,0.00013430488,0.00073026324,0.00042947487,0.72643507,0.009695873,0.0054435595,0.005218508,0.2383664],"study_design_scores_gemma":[0.000037376187,0.00005505666,0.00089309894,0.000011794129,0.000015298863,0.000041272553,0.00008146902,0.9949909,0.002264449,0.0004111163,0.0011878756,0.000010324753],"about_ca_topic_score_codex":0.03385179,"about_ca_topic_score_gemma":0.023045482,"teacher_disagreement_score":0.03385179,"about_ca_system_score_codex":0.0015445123,"about_ca_system_score_gemma":0.0012953972,"threshold_uncertainty_score":0.0673095},"labels":[],"label_agreement":null},{"id":"W2276297183","doi":"","title":"LOWELL and NELB, Architectural Records: Managing Design and Construction Records","year":2007,"lang":"en","type":"article","venue":"Archivaria","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Historical record; History; Architectural engineering; Engineering; Art history","score_opus":0.00812352889441691,"score_gpt":0.19827073070030768,"score_spread":0.19014720180589076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2276297183","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076283826,0.059901886,0.025445912,0.35677475,0.006304689,0.00046588565,0.00062683696,0.001655372,0.54119635],"genre_scores_gemma":[0.067122586,0.08183396,0.06499656,0.045488007,0.0022914289,0.0007597069,0.00108844,0.0010962787,0.73532313],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99291843,0.0020317836,0.00063522346,0.00057779835,0.003421813,0.0004148714],"domain_scores_gemma":[0.9916141,0.003141286,0.00064190093,0.00068676315,0.0029246323,0.0009913383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053212307,0.00062647235,0.00037303203,0.0036825133,0.015201807,0.02163775,0.0020460892,0.0047256076,0.009233479],"category_scores_gemma":[0.018196957,0.0009929381,0.00028456977,0.0054410324,0.009399177,0.020782683,0.005567773,0.005067318,0.004944794],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009134881,0.000027494738,0.0008189717,0.00019236008,0.000004326092,0.00015507314,0.027423829,0.00011399295,0.0002453678,0.090143785,0.73906344,0.14180216],"study_design_scores_gemma":[0.0000020544278,0.0000050472904,0.00049196684,0.00027876446,0.0000034742957,0.00009524511,0.00694033,0.00004859358,0.000110900284,0.0052499366,0.9867573,0.000016387927],"about_ca_topic_score_codex":0.15546504,"about_ca_topic_score_gemma":0.30295807,"teacher_disagreement_score":0.15546504,"about_ca_system_score_codex":0.010501006,"about_ca_system_score_gemma":0.02323542,"threshold_uncertainty_score":0.30912024},"labels":[],"label_agreement":null},{"id":"W2277459328","doi":"","title":"Enhanced earned value management on practical construction projects through constrained project scheduling simulations","year":2011,"lang":"en","type":"article","venue":"PolyU Institutional Research Archive (Hong Kong Polytechnic University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earned value management; Project management; Scheduling (production processes); Computer science; Operations research; Operations management; Engineering; Project management triangle; Systems engineering; Project charter","score_opus":0.09012750692421444,"score_gpt":0.3121417691437903,"score_spread":0.22201426221957588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2277459328","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8372487,0.00012292575,0.13494687,0.0002893557,0.000050736526,0.00013147295,0.000678127,0.0003975074,0.02613438],"genre_scores_gemma":[0.9863739,0.000035933303,0.01169312,0.0000152298235,0.0000051990805,0.000053517746,0.0001692929,0.0000610784,0.001592634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967253,0.00013394647,0.000016197857,0.000042271913,0.00007060604,0.000064489555],"domain_scores_gemma":[0.9964323,0.0024703597,0.00024983115,0.00024571642,0.00043828465,0.00016350955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001013574,0.00050556834,0.0008892158,0.0005828247,0.000555697,0.0013574363,0.0011150499,0.0010925567,0.005038809],"category_scores_gemma":[0.004580121,0.00065432297,0.0004961861,0.0010404369,0.0006223577,0.0009997031,0.0007164369,0.0008010562,0.00025767504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000150470605,0.000013800336,0.00016273577,0.000004208018,0.0000018110303,0.0000079922565,0.0000073781425,0.99848324,0.0000631518,0.00048406058,0.000040928568,0.00071569125],"study_design_scores_gemma":[0.000006377176,0.0000075663124,0.00007041406,0.0000014981164,0.0000014304849,9.193223e-7,0.0000074352106,0.99947625,0.00007665324,0.00030527113,0.00004435254,0.0000018905862],"about_ca_topic_score_codex":0.029699476,"about_ca_topic_score_gemma":0.020713603,"teacher_disagreement_score":0.029699476,"about_ca_system_score_codex":0.0015720894,"about_ca_system_score_gemma":0.0020599174,"threshold_uncertainty_score":0.059053183},"labels":[],"label_agreement":null},{"id":"W2279728478","doi":"","title":"Improving Efficiency and Productivity in the Construction Sector through the use of Information Technology. CEFRIO Phase 4 - Final Report","year":2013,"lang":"en","type":"article","venue":"Open Repository and Bibliography (University of Liège)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Productivity; Phase (matter); Information technology; Business; Computer science; Economics; Economic growth","score_opus":0.017454537495069214,"score_gpt":0.2000559391700115,"score_spread":0.18260140167494227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2279728478","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3053675,0.050049495,0.052973334,0.02658224,0.0015234535,0.004700128,0.02456967,0.0013711507,0.5328631],"genre_scores_gemma":[0.6579861,0.033047143,0.0992899,0.0015582572,0.00026316164,0.0033391952,0.026183873,0.00070814136,0.17762432],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9964097,0.0011667958,0.00011804838,0.00018583737,0.0015100713,0.00060952385],"domain_scores_gemma":[0.996795,0.0009499036,0.00019238587,0.00024619434,0.0015944444,0.0002220675],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063884086,0.00093137735,0.0005358696,0.0022600342,0.0006527764,0.0022658685,0.0013615128,0.0015625063,0.010231301],"category_scores_gemma":[0.0057405466,0.00035235734,0.0006478084,0.0029047679,0.0004659076,0.0017763459,0.002578903,0.00074594934,0.002248488],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022180062,0.003763366,0.01959862,0.0028692652,0.00018982199,0.00022713582,0.0016892516,0.020960785,0.015217582,0.053478595,0.21843888,0.66134864],"study_design_scores_gemma":[0.0007545903,0.0024456878,0.07608636,0.0032474387,0.00032665674,0.0002138183,0.002841045,0.0056901537,0.07721706,0.011233599,0.8198555,0.000088080276],"about_ca_topic_score_codex":0.03811341,"about_ca_topic_score_gemma":0.041240707,"teacher_disagreement_score":0.03811341,"about_ca_system_score_codex":0.003938433,"about_ca_system_score_gemma":0.016790433,"threshold_uncertainty_score":0.07578313},"labels":[],"label_agreement":null},{"id":"W2280906953","doi":"10.14288/1.0106085","title":"Social effects of subdivision design : a study in micro-ecology.","year":2012,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ecology; Social ecology; Geography; Biology; Political science","score_opus":0.007558465048464831,"score_gpt":0.17358724542455828,"score_spread":0.16602878037609345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2280906953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99817085,0.00006436757,0.000103110804,0.00012265748,0.0000072603534,0.000023215322,0.000016491118,0.0000015462844,0.0014905102],"genre_scores_gemma":[0.9982633,0.000099617464,0.00029803198,0.00013727519,0.0000072979374,0.000053991716,0.000023706983,0.000003715302,0.0011130187],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99787736,0.0013552136,0.000029056335,0.00017055204,0.00022809266,0.0003398005],"domain_scores_gemma":[0.99686676,0.0016614221,0.00041547912,0.0001348682,0.00027909383,0.0006423135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015330915,0.00021055277,0.00032521685,0.00066154584,0.0027068714,0.0015518381,0.00051010086,0.00060652354,0.002334896],"category_scores_gemma":[0.004072417,0.00029422186,0.00037799266,0.00061537477,0.002287443,0.00066213333,0.0015638124,0.000991418,0.00031500927],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040864854,0.0078056715,0.77001035,0.00015939119,0.00014544559,0.002499608,0.15737519,0.0003242433,0.004896224,0.0021509102,0.0021664193,0.05205789],"study_design_scores_gemma":[0.000033041262,0.0019811736,0.90318316,0.000031944408,0.000036899233,0.00033137592,0.08705169,0.00064695947,0.00032876735,0.0006236076,0.0057259765,0.000025374673],"about_ca_topic_score_codex":0.013593813,"about_ca_topic_score_gemma":0.054475345,"teacher_disagreement_score":0.013593813,"about_ca_system_score_codex":0.001451393,"about_ca_system_score_gemma":0.0008506448,"threshold_uncertainty_score":0.027029395},"labels":[],"label_agreement":null},{"id":"W2281887716","doi":"10.7492/ijaec.2017.001","title":"Design Change Management Using BIM-based Visualization Model","year":2017,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Visualization; Computer science; Building information modeling; Systems engineering; Process management; Construction engineering; Business; Engineering; Operations management; Data mining","score_opus":0.021989146083959837,"score_gpt":0.24751584277380267,"score_spread":0.22552669668984285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2281887716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07543381,0.0003787054,0.8729343,0.0008024743,0.00012200655,0.00034725489,0.00362737,0.009532172,0.036821805],"genre_scores_gemma":[0.63249433,0.00095646916,0.3493578,0.00007756253,0.000036086098,0.00072832307,0.004431121,0.0006200143,0.011298163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949825,0.00013740832,0.000037879836,0.00009270135,0.00018961896,0.00004420888],"domain_scores_gemma":[0.9992467,0.0002888194,0.000081718135,0.00013925416,0.00020688584,0.000036639685],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006881472,0.00085197267,0.0005023971,0.0015436852,0.0005174576,0.0023733962,0.0014238558,0.0011208027,0.0071160085],"category_scores_gemma":[0.002145301,0.0005359128,0.0012484768,0.0013180797,0.0004481934,0.0018140596,0.0011136883,0.00076408806,0.0011275933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067147856,0.00006589068,0.0020608518,0.00012292345,0.00002347259,0.00017919879,0.00035992955,0.9464636,0.0021382752,0.013582732,0.0024769679,0.032459047],"study_design_scores_gemma":[0.000011368116,0.000017952056,0.00041587066,0.00001804354,0.000013077885,0.000043956898,0.00006446204,0.98791903,0.001065788,0.003035545,0.007377025,0.000017847156],"about_ca_topic_score_codex":0.012386997,"about_ca_topic_score_gemma":0.010981659,"teacher_disagreement_score":0.012386997,"about_ca_system_score_codex":0.0011364109,"about_ca_system_score_gemma":0.001423952,"threshold_uncertainty_score":0.024629831},"labels":[],"label_agreement":null},{"id":"W2284147050","doi":"","title":"Upbrella and BIM: Rethinking the construction process in residential construction","year":2013,"lang":"fr","type":"article","venue":"Open Repository and Bibliography (University of Liège)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Process (computing); Construction engineering; Architectural engineering; Building information modeling; Environmental planning; Business; Engineering; Computer science; Operations management; Environmental science","score_opus":0.008816503493312667,"score_gpt":0.19643621596887778,"score_spread":0.1876197124755651,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284147050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050235942,0.007566352,0.7016765,0.014868478,0.0034615044,0.0003886333,0.0009337456,0.009385707,0.21148308],"genre_scores_gemma":[0.3260363,0.0073114056,0.54612184,0.0016999478,0.00062476716,0.00049331284,0.0015538795,0.008618334,0.10754028],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9885435,0.004347146,0.00048475017,0.0006955095,0.0055477545,0.00038135427],"domain_scores_gemma":[0.98453695,0.006195675,0.0005226871,0.0039351606,0.00437046,0.00043911423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01270691,0.0007372248,0.00088492164,0.005665775,0.003334881,0.01525155,0.0026705472,0.0026023437,0.026773917],"category_scores_gemma":[0.031524774,0.0011304041,0.00082760234,0.0059535378,0.004730793,0.014718231,0.008057878,0.002758581,0.008647039],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007731223,0.00014227668,0.0022662708,0.00073668815,0.000032761916,0.0003393165,0.018747024,0.0036595527,0.0031524263,0.14875087,0.041515637,0.7805799],"study_design_scores_gemma":[0.000021280182,0.000055495657,0.0039950507,0.0013037942,0.000062417705,0.00046518975,0.011489945,0.012943126,0.006233136,0.09166029,0.87165344,0.000116790805],"about_ca_topic_score_codex":0.006404516,"about_ca_topic_score_gemma":0.015954576,"teacher_disagreement_score":0.026773917,"about_ca_system_score_codex":0.0020135525,"about_ca_system_score_gemma":0.005676226,"threshold_uncertainty_score":0.08956772},"labels":[],"label_agreement":null},{"id":"W2284574175","doi":"","title":"Decision making tool for seismic retrofitting of non-ductile reinforced concrete building","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Seismic retrofit; Retrofitting; Reinforced concrete; Construction engineering; Forensic engineering; Geology; Structural engineering; Engineering","score_opus":0.013266945142890599,"score_gpt":0.23324326226135478,"score_spread":0.2199763171184642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284574175","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10211915,0.00011804148,0.879986,0.00031374602,0.000062206986,0.00033385446,0.0006406201,0.004065344,0.012361073],"genre_scores_gemma":[0.5742412,0.00009031462,0.42065987,0.000059572216,0.000015727725,0.00021613922,0.0005356517,0.00013882363,0.0040427037],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986619,0.0005041565,0.000107246255,0.00015029823,0.00042407739,0.00015237766],"domain_scores_gemma":[0.9976762,0.0014825284,0.00014637179,0.00010949514,0.00043535614,0.00014992224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028744817,0.00093741773,0.001151602,0.0019643642,0.0010083709,0.00246373,0.0015146927,0.00095847895,0.012521758],"category_scores_gemma":[0.004402263,0.00068577786,0.00089952874,0.00084408844,0.00038274264,0.0015453405,0.0012547373,0.00081329147,0.001313246],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017531238,0.00090290775,0.007529188,0.0003989669,0.00020067189,0.0011176707,0.0008204034,0.46125755,0.017571565,0.03338857,0.008242607,0.46681678],"study_design_scores_gemma":[0.000044573233,0.00010341492,0.0005438849,0.000030450763,0.00004796639,0.00006614825,0.00021389603,0.9836981,0.0068774316,0.005478726,0.0028725653,0.000022839391],"about_ca_topic_score_codex":0.0031638637,"about_ca_topic_score_gemma":0.004625802,"teacher_disagreement_score":0.012521758,"about_ca_system_score_codex":0.00081942085,"about_ca_system_score_gemma":0.001929527,"threshold_uncertainty_score":0.04188943},"labels":[],"label_agreement":null},{"id":"W2284936075","doi":"","title":"Efficiency in the provision of production specifications for the South African construction industry : : commentary","year":2005,"lang":"en","type":"article","venue":"Acta Structilia","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Workmanship; Inefficiency; Production (economics); System requirements specification; Computer science; National standard; Engineering; Operations management; Software engineering; Economics","score_opus":0.02173846815063285,"score_gpt":0.22735401901067662,"score_spread":0.20561555086004377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2284936075","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004359036,0.010173289,0.00012916142,0.97674304,0.00876148,0.00001173687,0.000052285264,0.000011775943,0.003681339],"genre_scores_gemma":[0.012793543,0.00726367,0.00027589063,0.9633751,0.010124884,0.00006446836,0.000029220208,0.00006048618,0.0060127103],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9765594,0.010122456,0.0023061254,0.002599011,0.0055842604,0.0028286648],"domain_scores_gemma":[0.86409765,0.1084156,0.0065051815,0.0021264076,0.016349018,0.00250618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031465255,0.0008182833,0.0008508895,0.0018552947,0.0080134645,0.007986952,0.0066270567,0.036325768,0.008473124],"category_scores_gemma":[0.12004494,0.0009965522,0.0011379333,0.0034596534,0.019751804,0.012497629,0.0071004243,0.035264112,0.0025298258],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007087407,0.000014293647,0.00034573214,0.0019959796,0.000021018699,0.0005125693,0.010414948,0.00014775201,0.00018653431,0.062326513,0.91044754,0.013516322],"study_design_scores_gemma":[0.000033377746,0.000017312284,0.0012097142,0.0034861357,0.00003136378,0.00025928722,0.0051687006,0.0000692642,0.00025897188,0.0058780736,0.9835374,0.00005035806],"about_ca_topic_score_codex":0.13583542,"about_ca_topic_score_gemma":0.12096063,"teacher_disagreement_score":0.13583542,"about_ca_system_score_codex":0.020011809,"about_ca_system_score_gemma":0.03727491,"threshold_uncertainty_score":0.2700895},"labels":[],"label_agreement":null},{"id":"W2288806340","doi":"10.1016/j.buildenv.2016.03.002","title":"Sustainability and resiliency metrics for buildings – Critical review","year":2016,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":155,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada; McMaster University; U.S. Environmental Protection Agency","keywords":"Sustainability; Certification; Architectural engineering; Engineering; Life-cycle assessment; Construction engineering; Environmental resource management; Risk analysis (engineering); Environmental economics; Business; Production (economics); Environmental science","score_opus":0.009710414519837993,"score_gpt":0.23470749236380328,"score_spread":0.22499707784396528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2288806340","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003869872,0.99280506,0.0018114778,0.0026832332,0.0006813606,0.000010131525,0.000038889553,0.000010080147,0.0015726914],"genre_scores_gemma":[0.008873243,0.98561513,0.003124792,0.0006455815,0.0012277365,0.000031949014,0.000089011475,0.00001779004,0.00037470995],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99688655,0.0010487015,0.00039891884,0.00038823497,0.0011164508,0.00016113352],"domain_scores_gemma":[0.9761016,0.016852932,0.0011850954,0.0005438421,0.004996157,0.00032036676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009154351,0.0017886882,0.0026400415,0.0074439645,0.000579554,0.003310624,0.0026096362,0.0022647895,0.0022583394],"category_scores_gemma":[0.018612575,0.00067792006,0.0008528502,0.009737539,0.0030638725,0.0068902415,0.0021149695,0.0029242907,0.00065829925],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007793394,0.00008944659,0.0011592461,0.02238727,0.00020950753,0.00012798955,0.0003586267,0.00500331,0.00069570885,0.10130404,0.052847896,0.815739],"study_design_scores_gemma":[0.000010429773,0.0001493195,0.002091583,0.032540172,0.00024874753,0.00049270334,0.00093547185,0.0017768972,0.0010699952,0.05841624,0.90216964,0.000098828845],"about_ca_topic_score_codex":0.0049195266,"about_ca_topic_score_gemma":0.005770376,"teacher_disagreement_score":0.009154351,"about_ca_system_score_codex":0.0034255616,"about_ca_system_score_gemma":0.005456319,"threshold_uncertainty_score":0.048413396},"labels":[],"label_agreement":null},{"id":"W2290179840","doi":"","title":"Investigating the impact of building information modeling on collaboration in the architecture, engineering, construction and operations industry","year":2015,"lang":"en","type":"article","venue":"Espace École de technologie supérieure (École de technologie supérieure)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Artifact (error); Context (archaeology); Building information modeling; Knowledge management; Design science research; Project management; Design science; Computer science; Process (computing); Management science; Engineering; Process management; Information system; Systems engineering; Operations management","score_opus":0.01429177910919271,"score_gpt":0.26242109027971755,"score_spread":0.24812931117052484,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290179840","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9393966,0.0004924515,0.025096793,0.0016882863,0.00003065766,0.00019632888,0.000065100496,0.000035418336,0.03299831],"genre_scores_gemma":[0.9912985,0.00036682797,0.007527464,0.000069834605,0.000007967854,0.000115038245,0.000047246504,0.000013865565,0.0005532855],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97659063,0.017961146,0.0007303889,0.0012749591,0.0023418441,0.0011009817],"domain_scores_gemma":[0.80504286,0.1738497,0.009570468,0.0046231677,0.005211958,0.00170181],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019606229,0.00043729294,0.00050012534,0.00231493,0.0025593976,0.0078513855,0.0009006535,0.0010627882,0.0047807074],"category_scores_gemma":[0.07706544,0.0003592265,0.00078649697,0.0028156142,0.0037351772,0.008239534,0.0077356957,0.0018452668,0.00040908167],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009707042,0.0019154947,0.26627037,0.002314526,0.00042367875,0.001015252,0.18804365,0.032292116,0.005837027,0.2852441,0.0020737138,0.21359935],"study_design_scores_gemma":[0.00020384075,0.003982429,0.25610173,0.0029152792,0.0009931986,0.0007597418,0.3624239,0.15062852,0.018400943,0.15624641,0.04706436,0.0002796388],"about_ca_topic_score_codex":0.0035866464,"about_ca_topic_score_gemma":0.0040542996,"teacher_disagreement_score":0.019606229,"about_ca_system_score_codex":0.0032747951,"about_ca_system_score_gemma":0.0049582487,"threshold_uncertainty_score":0.103688896},"labels":[],"label_agreement":null},{"id":"W2290402900","doi":"","title":"A Decision-Making Model For Surety Underwriters In The Construction Industry Based On Fuzzy Expert Systems","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Joint CIB W78, W102, ICCCBE, ICCC, and DMUCE International Conference on Computing and Decision Making in Civil and Building Engineering, Montreal, Canada, 14-16 June","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Underwriting; Surety; Process (computing); Computer science; Fuzzy logic; Decision-making models; Risk analysis (engineering); Decision-making; Operations research; Management science; Actuarial science; Artificial intelligence; Business; Engineering; Operations management; Finance","score_opus":0.014159491194868633,"score_gpt":0.2353643139504429,"score_spread":0.22120482275557427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290402900","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07391328,0.00025223216,0.9118551,0.0015028549,0.000048341593,0.0002705981,0.00032346134,0.00022417057,0.011609913],"genre_scores_gemma":[0.7912474,0.00044325704,0.19925685,0.00017740422,0.000044225908,0.0005317409,0.0002830925,0.000022801616,0.007993254],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885786,0.00045382534,0.00008345402,0.00022894407,0.0002314975,0.0001444187],"domain_scores_gemma":[0.99833125,0.0011010023,0.00015719018,0.000046304485,0.00024151077,0.00012276076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022612389,0.00075288414,0.00093304884,0.0009292583,0.0013039067,0.0035843654,0.0020843816,0.002720706,0.0053556603],"category_scores_gemma":[0.0031845868,0.00065641885,0.0010902544,0.0008746981,0.001186146,0.0024923673,0.0011752001,0.0015474049,0.0005501843],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012389918,0.00009418762,0.00074686186,0.00006710033,0.000046655703,0.00037574672,0.00037322336,0.9098351,0.0010980556,0.07804267,0.0005241491,0.008672333],"study_design_scores_gemma":[0.000034392775,0.000036364003,0.00010300545,0.000012377493,0.000017905197,0.000034286444,0.0000590803,0.98451555,0.00021261537,0.014192876,0.0007680978,0.000013400247],"about_ca_topic_score_codex":0.017375803,"about_ca_topic_score_gemma":0.015050155,"teacher_disagreement_score":0.017375803,"about_ca_system_score_codex":0.0033024445,"about_ca_system_score_gemma":0.0031616522,"threshold_uncertainty_score":0.034549296},"labels":[],"label_agreement":null},{"id":"W2290474416","doi":"","title":"Framework for Lifecycle Status Tracking and Visualization of Constructed Facility Components","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Visualization; Schedule; Component (thermodynamics); Computer science; Process (computing); Identification (biology); Real-time computing; Systems engineering; Radio-frequency identification; Tracking system; Engineering; Data mining; Artificial intelligence","score_opus":0.021451929122587626,"score_gpt":0.2746289220915752,"score_spread":0.25317699296898755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290474416","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020405427,0.00010872587,0.9917625,0.00011344236,0.000017506012,0.00012505882,0.0002630021,0.004201732,0.0013674949],"genre_scores_gemma":[0.052557338,0.0003191251,0.94409716,0.000033087297,0.00001405659,0.0004150374,0.00096258626,0.00023840855,0.0013631718],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988933,0.00030993487,0.00013237298,0.00014482008,0.00044369051,0.00007590203],"domain_scores_gemma":[0.9991296,0.00025643533,0.000113482754,0.00020089909,0.00022659104,0.00007305361],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021040435,0.0012942257,0.0007233894,0.003325066,0.0007856244,0.0035133024,0.0023516673,0.001415533,0.0048242062],"category_scores_gemma":[0.0029670575,0.0008336,0.0018631933,0.001632262,0.0008981464,0.0018747725,0.0024137248,0.0011817759,0.0011910343],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034137696,0.00036624333,0.0035797106,0.0014058326,0.0002853963,0.001364123,0.0035859707,0.26474187,0.039468586,0.21748485,0.020756284,0.4466198],"study_design_scores_gemma":[0.00008295974,0.000109994595,0.0010911681,0.0003816375,0.000094860705,0.0005958263,0.0003671368,0.8450842,0.01659832,0.032912165,0.10252769,0.00015411898],"about_ca_topic_score_codex":0.010472806,"about_ca_topic_score_gemma":0.010032932,"teacher_disagreement_score":0.010472806,"about_ca_system_score_codex":0.001146172,"about_ca_system_score_gemma":0.0021446692,"threshold_uncertainty_score":0.020823717},"labels":[],"label_agreement":null},{"id":"W2290795325","doi":"10.3963/jmpm.v3i3.164","title":"Implementation of a BIM Solution in a Small Construction Company","year":2016,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Process (computing); Building information modeling; Software deployment; Process management; Business; Quality (philosophy); Operations management; Risk analysis (engineering); Computer science; Engineering","score_opus":0.019137847860295615,"score_gpt":0.25206122372659634,"score_spread":0.2329233758663007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2290795325","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9710386,0.000096713644,0.009687626,0.001567601,0.000030004865,0.00063308334,0.000059246067,0.0001767577,0.016710477],"genre_scores_gemma":[0.97799647,0.00016663174,0.016131785,0.00019152329,0.000007643183,0.00021630854,0.00009063223,0.000031216518,0.0051677492],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9964018,0.0018854945,0.00014897683,0.00031517108,0.0006644322,0.0005841274],"domain_scores_gemma":[0.9961385,0.0014751913,0.00027300164,0.00038007024,0.0009297626,0.0008033904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003965053,0.00034297368,0.00025133556,0.001373989,0.003505072,0.002634097,0.0009174009,0.0013218411,0.0031633466],"category_scores_gemma":[0.005209069,0.00048057863,0.00039761848,0.001000401,0.0012443246,0.0015960572,0.002400349,0.00085390575,0.0007133659],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016864343,0.011556151,0.10570127,0.001693192,0.00015812222,0.03468132,0.17618687,0.027159762,0.08698966,0.036358155,0.013483981,0.5043452],"study_design_scores_gemma":[0.0005735951,0.013454144,0.16693325,0.0014544744,0.0003765452,0.007324257,0.42088005,0.069556884,0.055883657,0.007151668,0.25591594,0.00049560127],"about_ca_topic_score_codex":0.007930284,"about_ca_topic_score_gemma":0.012856907,"teacher_disagreement_score":0.007930284,"about_ca_system_score_codex":0.0037671565,"about_ca_system_score_gemma":0.00484486,"threshold_uncertainty_score":0.027332783},"labels":[],"label_agreement":null},{"id":"W2291225526","doi":"10.5555/2888619.2889076","title":"Online simulation modeling of prefabricated wall panel production using RFID system","year":2015,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Prefabrication; Discrete event simulation; Frame (networking); Computer science; Real-time computing; Production (economics); Radio-frequency identification; Event (particle physics); Simulation modeling; Modeling and simulation; Control (management); Simulation; Engineering; Embedded system; Civil engineering; Operating system","score_opus":0.1344940826086737,"score_gpt":0.28602735082417036,"score_spread":0.15153326821549665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2291225526","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6466061,0.0002836796,0.3059661,0.00035762566,0.000087675544,0.00021238893,0.0010850792,0.0017677469,0.0436336],"genre_scores_gemma":[0.98548526,0.00012072871,0.009035854,0.00001698742,0.0000049377977,0.00012106054,0.00028117906,0.00004215203,0.0048918803],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998029,0.0000535069,0.00001098665,0.00003394282,0.000052589316,0.00004612953],"domain_scores_gemma":[0.9996265,0.00020066784,0.00004170322,0.000025486786,0.00007592567,0.00002974676],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034049232,0.00059551885,0.0006125062,0.0004770235,0.00063439447,0.0010319985,0.0009097613,0.001182112,0.004389533],"category_scores_gemma":[0.00063306716,0.0003417652,0.0008839656,0.00046288632,0.0005205634,0.00053927116,0.00063497794,0.00057762774,0.00035393765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022130142,0.000016560016,0.00046446043,0.000010176083,0.0000034701056,0.000029785495,0.000021491654,0.9977755,0.0004039734,0.0005077778,0.000042625164,0.0007020413],"study_design_scores_gemma":[0.0000045014585,0.000008302165,0.00011220747,0.000001402834,0.0000019953814,0.0000029603468,0.0000087896315,0.9993923,0.0002482651,0.00009802369,0.00011913093,0.000002138206],"about_ca_topic_score_codex":0.030060083,"about_ca_topic_score_gemma":0.012754324,"teacher_disagreement_score":0.030060083,"about_ca_system_score_codex":0.00091219204,"about_ca_system_score_gemma":0.0011389294,"threshold_uncertainty_score":0.059770226},"labels":[],"label_agreement":null},{"id":"W2292918313","doi":"10.5555/2888619.2889077","title":"Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction","year":2015,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Task (project management); Ambiguity; Process (computing); Computer science; Control (management); Order (exchange); Cost estimate; Work (physics); Operations research; Industrial engineering; Engineering; Systems engineering; Business","score_opus":0.05085340466961483,"score_gpt":0.28873144677474805,"score_spread":0.23787804210513322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2292918313","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62053514,0.00033067487,0.35907024,0.00036717285,0.00003985162,0.00021028335,0.00020322415,0.00023732362,0.019005999],"genre_scores_gemma":[0.9803728,0.00009912234,0.017512377,0.00001583562,0.000003136908,0.00012692083,0.000059005826,0.0000230182,0.0017877321],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949193,0.0003053755,0.000013134293,0.000034704295,0.00006753541,0.000087296685],"domain_scores_gemma":[0.9981881,0.0014228756,0.00011757176,0.000049834176,0.00013097942,0.000090628804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014789883,0.0008347263,0.0010056946,0.0007660219,0.0005108765,0.0011042572,0.0008203158,0.0010708965,0.0041491864],"category_scores_gemma":[0.0020323503,0.0007005715,0.0010817451,0.000710963,0.00062805775,0.00073806057,0.00088753266,0.00081391865,0.0001486062],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019745978,0.000013514332,0.0001427234,0.000004916508,0.000004720658,0.0000086263535,0.000004879438,0.99879515,0.00008250426,0.0004430653,0.000016705759,0.00046352035],"study_design_scores_gemma":[0.000004739968,0.00001641468,0.000061124476,0.0000012412015,0.000002385523,0.0000016428388,0.000005544032,0.9995952,0.000064567765,0.00020567808,0.00003965908,0.0000017064943],"about_ca_topic_score_codex":0.014970201,"about_ca_topic_score_gemma":0.011973986,"teacher_disagreement_score":0.014970201,"about_ca_system_score_codex":0.0018032427,"about_ca_system_score_gemma":0.0014582361,"threshold_uncertainty_score":0.029766142},"labels":[],"label_agreement":null},{"id":"W2295128706","doi":"10.5555/2873021.2873029","title":"Digital campus innovation project: integration of building information modelling with building performance simulation and building diagnostics","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada); Carleton University","funders":"","keywords":"Building information modeling; Interoperability; Systems engineering; Building science; Facility management; Computer science; Building design; Asset management; Construction engineering; Engineering management; Engineering; Architectural engineering","score_opus":0.02088980364241859,"score_gpt":0.2358411866974149,"score_spread":0.21495138305499634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2295128706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08789626,0.0017554505,0.6842147,0.0047607296,0.00070509315,0.0013362669,0.0070040287,0.016741991,0.19558544],"genre_scores_gemma":[0.24298337,0.0015228115,0.70604336,0.00034802052,0.00012986518,0.00096760626,0.014062242,0.0020371932,0.031905487],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953466,0.0011489547,0.00014628928,0.00044309205,0.0026374434,0.00027761597],"domain_scores_gemma":[0.9961133,0.0011281,0.0001743654,0.0008985338,0.0011471343,0.00053866365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061723487,0.00091569277,0.00074063725,0.0025881247,0.00090634846,0.0050779,0.0021413115,0.0013277492,0.0070187147],"category_scores_gemma":[0.0063012852,0.0004971111,0.00092071964,0.0028932558,0.0015966963,0.0041491943,0.005117469,0.0018581094,0.0023322639],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004549878,0.0016872218,0.008982679,0.0006501646,0.00016874324,0.0003572269,0.0022401256,0.12153431,0.010352196,0.18714564,0.053584162,0.61284256],"study_design_scores_gemma":[0.00021412494,0.0005080632,0.007538985,0.0003658943,0.00013531686,0.00036999094,0.001261426,0.40999603,0.042415984,0.046973567,0.49002177,0.0001988024],"about_ca_topic_score_codex":0.014744218,"about_ca_topic_score_gemma":0.013581972,"teacher_disagreement_score":0.014744218,"about_ca_system_score_codex":0.0029903727,"about_ca_system_score_gemma":0.0050392803,"threshold_uncertainty_score":0.03264284},"labels":[],"label_agreement":null},{"id":"W2296373031","doi":"10.4271/2016-01-1190","title":"Development of the HyStEP Device","year":2016,"lang":"en","type":"article","venue":"SAE technical papers on CD-ROM/SAE technical paper series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Powertech Labs (Canada)","funders":"National Renewable Energy Laboratory; California Energy Commission","keywords":"Computer science","score_opus":0.010388881765293638,"score_gpt":0.2146721967079864,"score_spread":0.20428331494269275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2296373031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09291531,0.0016972203,0.69673157,0.0022630605,0.002196162,0.005502797,0.016782507,0.033787202,0.14812419],"genre_scores_gemma":[0.32137284,0.0018909834,0.51268196,0.0012029242,0.0003827905,0.0037558256,0.01286466,0.0022956876,0.14355242],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992499,0.00003264535,0.000035495144,0.00013205351,0.0004992643,0.000050633327],"domain_scores_gemma":[0.99944514,0.00009424926,0.0000321895,0.00009671168,0.00028478762,0.000047017948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006292798,0.00059456524,0.00065005064,0.0007133136,0.0004851706,0.00095505425,0.0017374635,0.00078715273,0.020842005],"category_scores_gemma":[0.0012344298,0.0006332075,0.00036710873,0.0003524275,0.0003309317,0.00094995176,0.0011432334,0.0010153353,0.012872198],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040847372,0.00019543461,0.004892314,0.0013615998,0.0000595997,0.0015745489,0.000642951,0.0040744636,0.45411694,0.020255487,0.117888875,0.3945293],"study_design_scores_gemma":[0.000118853,0.0009895301,0.007283379,0.00019767758,0.00006565645,0.002336024,0.00025398744,0.027472489,0.33709383,0.0016041148,0.62242734,0.00015711026],"about_ca_topic_score_codex":0.0006931498,"about_ca_topic_score_gemma":0.0006042243,"teacher_disagreement_score":0.020842005,"about_ca_system_score_codex":0.00044749543,"about_ca_system_score_gemma":0.00088613713,"threshold_uncertainty_score":0.06972349},"labels":[],"label_agreement":null},{"id":"W2296875920","doi":"10.7492/ijaec.2015.013","title":"A Methodology to Ensure the Consideration of Flexibility and Robustness in the Selection of Facility Renewal Projects","year":2015,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Robustness (evolution); Flexibility (engineering); Selection (genetic algorithm); Computer science; Operations research; Engineering; Operations management; Engineering management; Risk analysis (engineering); Systems engineering; Reliability engineering; Business; Management; Economics; Artificial intelligence","score_opus":0.03431796222631273,"score_gpt":0.26162363603079425,"score_spread":0.22730567380448152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2296875920","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056068446,0.000040814437,0.99172723,0.00008514892,0.00001086725,0.00056673744,0.000069216214,0.0003666375,0.0015265037],"genre_scores_gemma":[0.03959895,0.000034413304,0.9594078,0.000024516661,0.0000040671534,0.00048645618,0.00008787939,0.000023400768,0.000332621],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9900152,0.0044219038,0.001303069,0.001128778,0.0027543188,0.0003767101],"domain_scores_gemma":[0.978922,0.008921736,0.003368515,0.0026561113,0.0057669263,0.00036461029],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014913163,0.0009909568,0.00073645066,0.004325491,0.0012798315,0.0027267872,0.0016641548,0.0012595664,0.002374922],"category_scores_gemma":[0.03102036,0.0007875977,0.0012379687,0.00234498,0.0012556621,0.0018528248,0.001865988,0.0010062893,0.00059672137],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017318629,0.00055505824,0.014484557,0.0010479515,0.00028628437,0.00072140596,0.0018320794,0.21097118,0.02506652,0.1163339,0.0033048438,0.6252231],"study_design_scores_gemma":[0.0002633221,0.0012066191,0.0075745406,0.00077217206,0.000288715,0.0016666023,0.0014848053,0.8253236,0.033923544,0.0742363,0.053005427,0.00025443456],"about_ca_topic_score_codex":0.0032017147,"about_ca_topic_score_gemma":0.0052323374,"teacher_disagreement_score":0.014913163,"about_ca_system_score_codex":0.0015572506,"about_ca_system_score_gemma":0.007675983,"threshold_uncertainty_score":0.07886922},"labels":[],"label_agreement":null},{"id":"W2299109757","doi":"10.1061/ciegag.0000941","title":"Research Briefs: Canadian Research Center Seeks Best Ways of Reinforcing Masonry","year":2008,"lang":"en","type":"article","venue":"Civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Masonry; Center (category theory); Engineering; Research center; Forensic engineering; Civil engineering; Political science; Law","score_opus":0.06568011536768528,"score_gpt":0.2623629009636148,"score_spread":0.19668278559592953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2299109757","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007855027,0.029761452,0.0023687687,0.59385926,0.052385345,0.0018216544,0.0085489135,0.0003835177,0.30301607],"genre_scores_gemma":[0.04131169,0.028637493,0.004557819,0.0767414,0.006867904,0.0006222945,0.0041409023,0.00019944858,0.8369211],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99208415,0.00043394434,0.00027472398,0.0005138908,0.0055280384,0.0011652191],"domain_scores_gemma":[0.9443465,0.0026258887,0.0006394287,0.0006538876,0.045841288,0.0058930055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0074773813,0.0009479929,0.00088031933,0.0048189205,0.018994592,0.007709365,0.002550364,0.0067955395,0.07354711],"category_scores_gemma":[0.01854541,0.0009722452,0.0007839332,0.0056774514,0.0029505866,0.0043225,0.0020478014,0.0067639733,0.007950482],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016743234,0.00003144705,0.00044288597,0.00011347697,0.0000029018563,0.00003589825,0.0004754596,0.000050964125,0.00025602247,0.0035477132,0.98139864,0.013627792],"study_design_scores_gemma":[0.00001772369,0.00003591898,0.0034860417,0.0002984337,0.00001807493,0.00004514733,0.0045431904,0.00008666846,0.00037623805,0.0009266782,0.99013245,0.000033497963],"about_ca_topic_score_codex":0.9250513,"about_ca_topic_score_gemma":0.98165834,"teacher_disagreement_score":0.08574666,"about_ca_system_score_codex":0.08574666,"about_ca_system_score_gemma":0.22042802,"threshold_uncertainty_score":0.6221385},"labels":[],"label_agreement":null},{"id":"W2301628738","doi":"10.14288/1.0063135","title":"Integrating data models, analysis and multidimensional visualizations : a unified construction project management arena","year":2010,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Data science; Process management; Engineering","score_opus":0.011883905924690168,"score_gpt":0.19421912648053857,"score_spread":0.18233522055584842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2301628738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013867894,0.005456524,0.9422056,0.016437925,0.00027594465,0.00019793907,0.00014608758,0.002778633,0.018633349],"genre_scores_gemma":[0.13560677,0.0041324385,0.85326916,0.0009704893,0.0006008965,0.00048979657,0.0003780502,0.00066477724,0.0038875868],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9769528,0.0114112375,0.0014620229,0.0019341899,0.00742877,0.0008109505],"domain_scores_gemma":[0.98505545,0.0061090807,0.00086803123,0.004532875,0.0019845893,0.0014499695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.032031458,0.0014283838,0.0020614443,0.007914638,0.0031153327,0.027073348,0.005269898,0.004865517,0.0027690306],"category_scores_gemma":[0.018586807,0.0027885616,0.0025891033,0.008786536,0.0097562475,0.039781563,0.020603495,0.009276673,0.000981486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007185352,0.00021823354,0.0019465066,0.00030403363,0.00007169738,0.00047266603,0.0060931128,0.010092706,0.0029143991,0.7623143,0.009205495,0.20629506],"study_design_scores_gemma":[0.00008200936,0.00021891177,0.0020495215,0.001272631,0.00007735296,0.0010694391,0.0058122743,0.13843091,0.0032793847,0.61310583,0.23437417,0.00022758426],"about_ca_topic_score_codex":0.0026888524,"about_ca_topic_score_gemma":0.0020493143,"teacher_disagreement_score":0.032031458,"about_ca_system_score_codex":0.0037389372,"about_ca_system_score_gemma":0.0064467704,"threshold_uncertainty_score":0.16940057},"labels":[],"label_agreement":null},{"id":"W2305381679","doi":"10.14288/1.0089967","title":"The integral building-landscape : developing a language of integration","year":2009,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Linguistics; Computer science; Philosophy","score_opus":0.004209850121915747,"score_gpt":0.1651786989913875,"score_spread":0.16096884886947177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2305381679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020782033,0.012543621,0.73463106,0.032098103,0.0019814672,0.00033665705,0.00017445345,0.000426517,0.19702609],"genre_scores_gemma":[0.52737486,0.010165691,0.43898568,0.005363046,0.0015008623,0.0015274166,0.00039140237,0.0006544213,0.014036593],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9866132,0.010223797,0.0006651713,0.00089560763,0.0011481836,0.00045397918],"domain_scores_gemma":[0.99281704,0.0047998317,0.00060105044,0.0006391974,0.0008525111,0.0002904469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013969096,0.0012389236,0.0008835765,0.0053110663,0.004515911,0.012357335,0.003119037,0.0036327234,0.0039681685],"category_scores_gemma":[0.010904858,0.0007676273,0.00097093306,0.004827433,0.02935961,0.024956504,0.0078618415,0.0076348293,0.0010452962],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000042691386,0.0000055173937,0.000085506304,0.00005311096,0.0000018379626,0.000049657538,0.008504778,0.00013809266,0.00010751386,0.9858372,0.0008036229,0.004408751],"study_design_scores_gemma":[0.00001434619,0.000057475183,0.00042160228,0.0006931881,0.0000132147925,0.00051859696,0.015424174,0.003640567,0.00053839176,0.70797306,0.270672,0.000033326032],"about_ca_topic_score_codex":0.0022980156,"about_ca_topic_score_gemma":0.0018930446,"teacher_disagreement_score":0.013969096,"about_ca_system_score_codex":0.004726895,"about_ca_system_score_gemma":0.0041463776,"threshold_uncertainty_score":0.0738765},"labels":[],"label_agreement":null},{"id":"W2307011503","doi":"10.1016/j.aei.2016.03.001","title":"Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry","year":2016,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":129,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Ontology; Information model; Computer science; Domain (mathematical analysis); Frame (networking); Building model; Semantics (computer science); Vocabulary; Building design; Systems engineering; Software engineering; Engineering; Architectural engineering; Simulation","score_opus":0.009765036172923854,"score_gpt":0.20954577400709343,"score_spread":0.19978073783416958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2307011503","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013168494,0.0002717804,0.97352594,0.0004894882,0.00006858041,0.00011390334,0.00033721278,0.000539738,0.011484871],"genre_scores_gemma":[0.41229445,0.00091864617,0.5793722,0.00023047786,0.000055757486,0.00026561331,0.0020082768,0.00023653377,0.0046180626],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983126,0.0004160516,0.00018652248,0.00019943478,0.0007539349,0.00013147572],"domain_scores_gemma":[0.9993674,0.00015648775,0.000058947655,0.00015733246,0.00021782852,0.000042078962],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017544784,0.0006041247,0.0006911323,0.0034270333,0.0012850239,0.0034458435,0.001495041,0.0010214658,0.0024204336],"category_scores_gemma":[0.0021727402,0.00057139515,0.0023791918,0.0034428453,0.0015600913,0.005441489,0.003816609,0.0015673775,0.0006369025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097928714,0.0002657157,0.0020135727,0.00033088695,0.0001289255,0.00088785694,0.0023783874,0.03183024,0.007160537,0.8265985,0.0038766908,0.12443066],"study_design_scores_gemma":[0.00003304235,0.000049223097,0.0019721629,0.00029725328,0.00027553955,0.0005946146,0.0026140271,0.4465537,0.008544565,0.4725612,0.06639397,0.00011073825],"about_ca_topic_score_codex":0.009880877,"about_ca_topic_score_gemma":0.011258183,"teacher_disagreement_score":0.009880877,"about_ca_system_score_codex":0.0014274,"about_ca_system_score_gemma":0.0025221282,"threshold_uncertainty_score":0.019646704},"labels":[],"label_agreement":null},{"id":"W2308998501","doi":"","title":"Improving Efficiency and Productivity in the Construction Sector through the use of Information Technology. CEFRIO Phase 3 - RESEARCH PROTOCOL FOR THE PILOT PROJECTS : Final Report","year":2012,"lang":"en","type":"article","venue":"Open Repository and Bibliography (University of Liège)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Productivity; Phase (matter); Protocol (science); Engineering management; Business; Operations management; Engineering; Process management; Economics; Economic growth; Medicine","score_opus":0.10682483258345468,"score_gpt":0.30839774940512976,"score_spread":0.20157291682167508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2308998501","genre_codex":"protocol","genre_gemma":"protocol","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"protocol","genre_consensus":"protocol","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15445161,0.0022780637,0.08115935,0.0068139606,0.00076519855,0.4281921,0.0992489,0.0011164886,0.22597438],"genre_scores_gemma":[0.2586491,0.0017480439,0.18757196,0.00096787536,0.000074566946,0.45587698,0.03735058,0.0002501977,0.057510685],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9847799,0.008136413,0.00095219107,0.0008461587,0.0037483221,0.0015370544],"domain_scores_gemma":[0.9719135,0.00833469,0.001426633,0.0039458787,0.013227263,0.0011519835],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02835156,0.0008482897,0.00070457085,0.0020155406,0.0020604783,0.0016619453,0.0023109722,0.0022306948,0.025098152],"category_scores_gemma":[0.032637313,0.0007659332,0.0007384064,0.0022178423,0.0011206992,0.0015515249,0.0035549658,0.001066636,0.004781052],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.024138575,0.0106297,0.022946985,0.012846494,0.00022445386,0.000362269,0.007099897,0.013759028,0.03529448,0.05208336,0.24700531,0.5736096],"study_design_scores_gemma":[0.010431157,0.01732861,0.15025541,0.008137091,0.00059498346,0.00024651398,0.009559533,0.0038185657,0.09299373,0.015493615,0.6907886,0.0003522613],"about_ca_topic_score_codex":0.026371352,"about_ca_topic_score_gemma":0.041757252,"teacher_disagreement_score":0.02835156,"about_ca_system_score_codex":0.0050221435,"about_ca_system_score_gemma":0.043305166,"threshold_uncertainty_score":0.14993918},"labels":[],"label_agreement":null},{"id":"W2312795577","doi":"10.1108/ci-07-2015-0040","title":"System model for analysing construction labour productivity","year":2016,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Regression analysis; Variance (accounting); Work (physics); Computer science; Engineering; Predictive modelling; Operations research; Reliability engineering; Machine learning","score_opus":0.015638254349887606,"score_gpt":0.21988066819164787,"score_spread":0.20424241384176026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2312795577","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08306723,0.00065495673,0.8940045,0.0006153265,0.00014645954,0.0006783979,0.0024365897,0.0012061166,0.017190399],"genre_scores_gemma":[0.8544706,0.0007865065,0.13384417,0.000077902354,0.000061295315,0.0016232012,0.0021287452,0.00009945607,0.0069080847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983517,0.0006747474,0.000113500864,0.00037359912,0.00037105693,0.000115340474],"domain_scores_gemma":[0.99716103,0.0018387592,0.00032121834,0.000113136746,0.00050134014,0.000064551095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021893785,0.0014855879,0.00083507394,0.0022597117,0.00072823843,0.0023991435,0.0014226651,0.0011860653,0.007178173],"category_scores_gemma":[0.0058796303,0.00048776387,0.0015117762,0.0025353536,0.0005723903,0.0017857534,0.00151124,0.001278274,0.0010004453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001334098,0.00014573702,0.017554034,0.00044935348,0.00028100386,0.00024613825,0.0006968101,0.9100043,0.0014574416,0.027973969,0.0018479623,0.03920984],"study_design_scores_gemma":[0.000016762648,0.000110616085,0.002891917,0.00006322617,0.00006257932,0.000039339724,0.00020819587,0.9835698,0.0002493911,0.009202702,0.003559876,0.000025623322],"about_ca_topic_score_codex":0.01983583,"about_ca_topic_score_gemma":0.015150317,"teacher_disagreement_score":0.01983583,"about_ca_system_score_codex":0.002795905,"about_ca_system_score_gemma":0.0028926479,"threshold_uncertainty_score":0.03944075},"labels":[],"label_agreement":null},{"id":"W2313173268","doi":"10.1061/40937(261)36","title":"Towards Supporting Construction Equipment Operation Using Collaborative Agent-Based Systems","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Bridge (graph theory); Lift (data mining); Computer science; Task (project management); Multi-agent system; Kinematics; Systems engineering; Engineering; Artificial intelligence","score_opus":0.016264232457012726,"score_gpt":0.262367563427994,"score_spread":0.24610333097098128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313173268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005648918,0.0002832781,0.9885356,0.00020370547,0.00005385122,0.000102566584,0.000008435075,0.000498845,0.0046648197],"genre_scores_gemma":[0.19285819,0.0008079654,0.8014528,0.00013225597,0.0000697174,0.00039392826,0.000086593915,0.00006186464,0.004136637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980404,0.0006916015,0.0001354478,0.00024717237,0.0007337818,0.00015180492],"domain_scores_gemma":[0.9986903,0.00047704944,0.00011407857,0.0002849095,0.0003164917,0.000117251904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021543682,0.0008204479,0.00079161336,0.0007916892,0.00093577534,0.003216342,0.0024529358,0.002342407,0.0017891369],"category_scores_gemma":[0.0033279096,0.000616271,0.00076554174,0.0009213674,0.0011594064,0.0026149773,0.0031091282,0.0017902086,0.0008513165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001719871,0.00047889882,0.002215874,0.00083722,0.00020242164,0.0011803148,0.002500822,0.39842358,0.03817269,0.23173359,0.006103331,0.31797928],"study_design_scores_gemma":[0.00008079228,0.00013506645,0.00027996724,0.00008858069,0.00008024217,0.00024986512,0.00025104263,0.90822494,0.007397753,0.03345953,0.04970383,0.00004853349],"about_ca_topic_score_codex":0.0027870054,"about_ca_topic_score_gemma":0.0025141276,"teacher_disagreement_score":0.003216342,"about_ca_system_score_codex":0.00051371084,"about_ca_system_score_gemma":0.0015008327,"threshold_uncertainty_score":0.011393487},"labels":[],"label_agreement":null},{"id":"W2313374887","doi":"10.1061/41000(315)6","title":"Implementation of Building Information Modeling (BIM) on the Renovation of the Art Gallery of Alberta in Edmonton, Alberta","year":2008,"lang":"en","type":"article","venue":"Structures Congress 2008","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; LEAPS; Architecture; Argument (complex analysis); Architectural engineering; Upgrade; Exhibition; Computer science; Information model; Engineering; Software engineering; Business; Operations management; Visual arts","score_opus":0.01095569078014433,"score_gpt":0.2247394657942013,"score_spread":0.21378377501405696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313374887","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19628698,0.0019383524,0.044067454,0.0058154366,0.0006662108,0.0004816676,0.0033119833,0.0075335754,0.7398984],"genre_scores_gemma":[0.4346304,0.0016910933,0.0759696,0.0004783724,0.00004065727,0.000102191894,0.004678041,0.001597293,0.48081234],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.998577,0.00016105066,0.000021584949,0.00015320032,0.0008702746,0.00021689826],"domain_scores_gemma":[0.99915934,0.00012715676,0.000015916628,0.00013113987,0.00037621072,0.0001901507],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017776848,0.00041019713,0.0002432688,0.0011708601,0.004877984,0.003584018,0.0019247028,0.0006784177,0.02541771],"category_scores_gemma":[0.0014820788,0.00044835688,0.00034828685,0.0017970804,0.0019494012,0.0009953282,0.003109508,0.001162142,0.0029421886],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054363365,0.00022616897,0.013155491,0.0002805601,0.00004940411,0.0022673989,0.020617075,0.018499566,0.014446071,0.11871763,0.19722117,0.6139758],"study_design_scores_gemma":[0.00002545149,0.00005147161,0.02401479,0.0001074782,0.000018887913,0.00014331676,0.0055957413,0.009916026,0.004270554,0.0023531576,0.9534364,0.000066653694],"about_ca_topic_score_codex":0.9328933,"about_ca_topic_score_gemma":0.9781315,"teacher_disagreement_score":0.067106724,"about_ca_system_score_codex":0.019718383,"about_ca_system_score_gemma":0.021318838,"threshold_uncertainty_score":0.14306754},"labels":[],"label_agreement":null},{"id":"W2313811027","doi":"10.3141/2573-13","title":"Innovative Design, Traffic Management, and Construction of Concrete Overlay Technology: Canadian Municipal Application","year":2016,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Regional Municipality of Waterloo; Cement Association of Canada; University of Waterloo","funders":"","keywords":"Overlay; Transport engineering; Access management; Heavy traffic; Engineering; Civil engineering; Computer science","score_opus":0.036116180982500364,"score_gpt":0.30252692430844624,"score_spread":0.2664107433259459,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2313811027","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85566556,0.0022171244,0.018504174,0.0013673885,0.00006567024,0.00058618834,0.00018533347,0.00035843693,0.12105007],"genre_scores_gemma":[0.92977554,0.0035688444,0.046180855,0.00005937433,0.000008067768,0.00009859356,0.00014992703,0.000040907482,0.020117855],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987471,0.00019570054,0.00003938803,0.00010337932,0.0007034502,0.00021098292],"domain_scores_gemma":[0.99916613,0.00011591721,0.000048572543,0.00007169348,0.00047617697,0.00012144475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014675907,0.00049101043,0.00018647434,0.0012257647,0.0035613633,0.0021866257,0.0011699894,0.0006511013,0.0030589756],"category_scores_gemma":[0.0022564137,0.00022140668,0.00022944195,0.0027955368,0.0014979158,0.0007920465,0.001430431,0.00045470803,0.00028846672],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019380474,0.001085074,0.03004787,0.001168172,0.000045150355,0.001317034,0.019068483,0.022938859,0.042593844,0.038780592,0.009190207,0.83357096],"study_design_scores_gemma":[0.0001260759,0.0024666616,0.16800882,0.00077920285,0.00031829032,0.002069341,0.055042572,0.043947466,0.054007094,0.009066638,0.6639029,0.00026499567],"about_ca_topic_score_codex":0.7381511,"about_ca_topic_score_gemma":0.9120713,"teacher_disagreement_score":0.26184893,"about_ca_system_score_codex":0.020081254,"about_ca_system_score_gemma":0.027913382,"threshold_uncertainty_score":0.526782},"labels":[],"label_agreement":null},{"id":"W2314499624","doi":"10.1061/9780784412480.135","title":"Design-Build of Wastewater Force-Main in North Bay Village: Lessons Learned from the Design-Build Team's Perspective","year":2012,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Miami; Bay; Civil engineering; Geography; Engineering; Environmental science","score_opus":0.028777681745738602,"score_gpt":0.24165515895354964,"score_spread":0.21287747720781103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2314499624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36093014,0.0048668813,0.23219486,0.07316535,0.0017978821,0.0020210403,0.00027022965,0.0011463757,0.3236072],"genre_scores_gemma":[0.65403897,0.0036789197,0.22860366,0.0041927444,0.0002569673,0.00066914834,0.00038445825,0.00079432724,0.10738082],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9888602,0.005461358,0.0002881791,0.0009865089,0.0029437565,0.0014599895],"domain_scores_gemma":[0.986192,0.0037895197,0.00042497108,0.0009888387,0.0040174164,0.0045872787],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015739238,0.0009421504,0.00040464444,0.0011301587,0.006891338,0.007533567,0.0043149893,0.0029220867,0.008297019],"category_scores_gemma":[0.014102486,0.0008188409,0.0004976281,0.0008183292,0.004194045,0.0038923337,0.0048589115,0.005123486,0.0019605723],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015474066,0.0031906727,0.017906748,0.0013020366,0.00006391861,0.0034694094,0.2379695,0.017606832,0.008016043,0.052332155,0.111421995,0.54656595],"study_design_scores_gemma":[0.00010373778,0.0015245625,0.007843286,0.0009057862,0.000037784484,0.0015530196,0.24976346,0.007571068,0.003397215,0.01624081,0.7109175,0.00014181058],"about_ca_topic_score_codex":0.021183245,"about_ca_topic_score_gemma":0.075007185,"teacher_disagreement_score":0.021183245,"about_ca_system_score_codex":0.009982443,"about_ca_system_score_gemma":0.019785715,"threshold_uncertainty_score":0.083238006},"labels":[],"label_agreement":null},{"id":"W2315420192","doi":"10.1061/40475(278)97","title":"Assessing the Quality of a Construction Schedule","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Computer science; Scheduling (production processes); Quality (philosophy); Work (physics); Production schedule; Operations research; Risk analysis (engineering); Operations management; Engineering; Business","score_opus":0.023000472512406868,"score_gpt":0.29126839913270774,"score_spread":0.26826792662030086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315420192","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3261916,0.00083263795,0.653586,0.0004501269,0.00023300287,0.0003529429,0.0010231523,0.0020938497,0.015236676],"genre_scores_gemma":[0.7973066,0.0005009028,0.19752654,0.00005312746,0.00006683163,0.00012865082,0.0015977913,0.0004624846,0.0023571122],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99062914,0.0022689404,0.0009305889,0.0004701737,0.005466473,0.00023470883],"domain_scores_gemma":[0.961831,0.012301839,0.007015091,0.0029899855,0.014846374,0.0010157189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072099688,0.0005691664,0.00053585967,0.00434569,0.0006424883,0.0025561056,0.000559477,0.00070401636,0.002806074],"category_scores_gemma":[0.042543128,0.00038797123,0.0003413678,0.0026020948,0.0007400538,0.0020490754,0.0009370217,0.00057296694,0.00064032857],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013785864,0.00022037365,0.091374345,0.0009881229,0.0002701969,0.0003091983,0.0026739966,0.15662093,0.031112831,0.023534663,0.0072703757,0.6842463],"study_design_scores_gemma":[0.00018983285,0.0031048525,0.18093674,0.0006740288,0.00035529598,0.0014738018,0.0057684393,0.6203583,0.06770081,0.0341604,0.0847275,0.0005500271],"about_ca_topic_score_codex":0.003945632,"about_ca_topic_score_gemma":0.003719328,"teacher_disagreement_score":0.0072099688,"about_ca_system_score_codex":0.0010838907,"about_ca_system_score_gemma":0.0015394664,"threshold_uncertainty_score":0.038130403},"labels":[],"label_agreement":null},{"id":"W2315497027","doi":"10.1061/40475(278)11","title":"Creating Special Purpose Simulation Tools with Simphony","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Implementation; Computer science; Flexibility (engineering); Domain (mathematical analysis); Systems engineering; Software engineering; Point (geometry); Engineering","score_opus":0.008198032639244242,"score_gpt":0.20034719952359772,"score_spread":0.1921491668843535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315497027","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0051317317,0.000069121146,0.9802657,0.000045045555,0.000037216192,0.00010113844,0.000114594586,0.008303442,0.005932032],"genre_scores_gemma":[0.091313235,0.00035609215,0.89769375,0.00008698911,0.000026272757,0.00047589972,0.0013446797,0.0041470337,0.004555976],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985721,0.00040771952,0.00013160199,0.00016385021,0.0005749364,0.00014969711],"domain_scores_gemma":[0.9983791,0.0006544336,0.000093367256,0.0004716847,0.00028790697,0.0001135278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002547205,0.00089905143,0.00091750536,0.001236849,0.00079959317,0.0023013614,0.002125663,0.00091676303,0.009009613],"category_scores_gemma":[0.0041228877,0.0008748765,0.0015530444,0.0007877718,0.0010716342,0.002541372,0.0034743918,0.0015326206,0.0026245108],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004783363,0.00031530226,0.004743598,0.0010059397,0.00022160653,0.0007192981,0.0028428843,0.25060678,0.02709945,0.33078966,0.02291574,0.35826132],"study_design_scores_gemma":[0.000096987,0.000108330125,0.0005258466,0.00022774037,0.000068166104,0.00045120207,0.00027597573,0.61149764,0.041053172,0.038571343,0.307024,0.00009953188],"about_ca_topic_score_codex":0.0012668292,"about_ca_topic_score_gemma":0.002080412,"teacher_disagreement_score":0.009009613,"about_ca_system_score_codex":0.0007394566,"about_ca_system_score_gemma":0.0013472448,"threshold_uncertainty_score":0.030140102},"labels":[],"label_agreement":null},{"id":"W2315595975","doi":"10.1061/40937(261)100","title":"Design of a Distributed Mixed Reality System for Construction Simulation","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Bridge (graph theory); Virtual reality; Animation; Human–computer interaction; Computer animation; Virtual machine; Simulation; Computer graphics (images); Operating system","score_opus":0.024338066969811497,"score_gpt":0.24514022631060858,"score_spread":0.22080215934079708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2315595975","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010030824,0.000051525694,0.9816149,0.00007289212,0.000052299984,0.00026057608,0.000056452667,0.0038093275,0.0040511927],"genre_scores_gemma":[0.35172406,0.00015532189,0.63774884,0.00012678842,0.000047931815,0.0011526851,0.0003608843,0.00041428814,0.00826913],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991623,0.00023849879,0.00006173978,0.00018243608,0.00028193803,0.00007310326],"domain_scores_gemma":[0.99945,0.00014363488,0.00003150029,0.000110840854,0.00018250654,0.00008154908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007680729,0.00063965673,0.0007238307,0.0004953801,0.00057570316,0.0011195318,0.0019412736,0.0008687393,0.007488051],"category_scores_gemma":[0.0014162408,0.0005390283,0.0005319615,0.00027371306,0.00035109988,0.0008326454,0.0011717799,0.0006252421,0.0020454903],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017839383,0.00083922583,0.005458987,0.0008903799,0.00028949123,0.0013873717,0.0025496774,0.25476184,0.25078422,0.03820531,0.010848129,0.43220153],"study_design_scores_gemma":[0.00032359172,0.00082016876,0.0014112873,0.00006143878,0.00015113746,0.0006280187,0.00022171212,0.84828645,0.062125716,0.0035209532,0.08234105,0.00010843934],"about_ca_topic_score_codex":0.0011685827,"about_ca_topic_score_gemma":0.00086759607,"teacher_disagreement_score":0.007488051,"about_ca_system_score_codex":0.00048712056,"about_ca_system_score_gemma":0.00067712646,"threshold_uncertainty_score":0.025049984},"labels":[],"label_agreement":null},{"id":"W2316164171","doi":"10.1061/40513(279)104","title":"IFC-Based Data Model for Integrated Maintenance Management","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; University of British Columbia","funders":"National Research Council Canada; Public Works and Government Services Canada","keywords":"Interoperability; Computer science; Information model; Systems engineering; Data modeling; Domain (mathematical analysis); Software engineering; Object model; Object (grammar); Engineering; World Wide Web","score_opus":0.022019512377449414,"score_gpt":0.22339314494210366,"score_spread":0.20137363256465424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316164171","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040789745,0.0003109977,0.9612878,0.0011596774,0.00022914067,0.00054664945,0.0062571694,0.0041656373,0.021963866],"genre_scores_gemma":[0.09861959,0.00078335125,0.8543761,0.0008940195,0.00015551946,0.002038548,0.027548647,0.0011231571,0.014461054],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9954627,0.0008373443,0.0009668078,0.00073008,0.0016214038,0.00038166856],"domain_scores_gemma":[0.99400795,0.0008993649,0.00041406564,0.0028979296,0.001569394,0.00021143322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0053837253,0.0009750345,0.00118584,0.0041722627,0.0017617843,0.008702984,0.0039277975,0.003262417,0.0066105407],"category_scores_gemma":[0.008865994,0.00067457743,0.0026370725,0.0060489266,0.0018815687,0.008492661,0.0030132327,0.0034894494,0.003991694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099599536,0.00012466042,0.0021680477,0.00030139022,0.00008050186,0.0004750785,0.00078392343,0.06273197,0.0021935566,0.84947336,0.02535865,0.056209296],"study_design_scores_gemma":[0.00005972255,0.000067065506,0.0007423932,0.00031721086,0.00012357511,0.00055556936,0.00024242645,0.24343328,0.0042773187,0.13338006,0.6166957,0.000105655665],"about_ca_topic_score_codex":0.024029626,"about_ca_topic_score_gemma":0.016656196,"teacher_disagreement_score":0.024029626,"about_ca_system_score_codex":0.005485288,"about_ca_system_score_gemma":0.0060934625,"threshold_uncertainty_score":0.0477795},"labels":[],"label_agreement":null},{"id":"W2316255756","doi":"10.1061/40513(279)71","title":"Visual Representation of Project Planning and Control Data","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Project management; Project planning; Scheduling (production processes); Construction management; Control (management); Pre-construction services; Work breakdown structure; Representation (politics); Process (computing); Construction engineering; Systems engineering; Engineering; Civil engineering; Project charter; Artificial intelligence; Operations management; Programming language","score_opus":0.027864971812588433,"score_gpt":0.3007425413240152,"score_spread":0.2728775695114267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316255756","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013839273,0.00045243013,0.95738703,0.0006089086,0.00014799774,0.00020248134,0.0043323436,0.004951156,0.018078322],"genre_scores_gemma":[0.36273867,0.001398689,0.6161527,0.00029833562,0.000073303956,0.00067125197,0.008917141,0.0013941027,0.008355791],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99928963,0.00019377144,0.000056274985,0.00009430589,0.00030778756,0.000058259135],"domain_scores_gemma":[0.9983954,0.0006589355,0.000120092256,0.00032231942,0.00040686727,0.0000963091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011281025,0.0007597708,0.0004419614,0.002679879,0.0003355417,0.0035101653,0.00080951786,0.00067999354,0.008474118],"category_scores_gemma":[0.0044941325,0.00038152898,0.00043661377,0.0022335346,0.0006524356,0.0022170066,0.0016440831,0.0010428529,0.0016883124],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011538621,0.00021420138,0.0032097087,0.0016950867,0.0000677109,0.00107235,0.004309988,0.18808043,0.024363074,0.16987874,0.049961932,0.55599296],"study_design_scores_gemma":[0.00013991733,0.00020709606,0.0033394645,0.0009150687,0.000093395545,0.0009275839,0.0024809104,0.49644366,0.034209374,0.11121135,0.34980783,0.00022441294],"about_ca_topic_score_codex":0.004698024,"about_ca_topic_score_gemma":0.0032024921,"teacher_disagreement_score":0.008474118,"about_ca_system_score_codex":0.00064433436,"about_ca_system_score_gemma":0.00093493273,"threshold_uncertainty_score":0.028348744},"labels":[],"label_agreement":null},{"id":"W2316944648","doi":"10.1061/40937(261)24","title":"Building Intelligent Applications for Construction Equipment Management","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Data management; Construction management; Decision support system; Knowledge extraction; Information management; Knowledge management; Data science; Systems engineering; Risk analysis (engineering); Engineering; Data mining; Business","score_opus":0.010980341257005692,"score_gpt":0.2492954399004515,"score_spread":0.2383150986434458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2316944648","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00611308,0.0023226659,0.9343809,0.00092391984,0.00013396823,0.00014441804,0.00027741873,0.0062549273,0.04944868],"genre_scores_gemma":[0.11532385,0.004464586,0.86398923,0.00037298352,0.00017534173,0.00020672542,0.0009915745,0.00026567548,0.014210105],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996278,0.00010045637,0.000029773535,0.00005569276,0.00016074513,0.00002546459],"domain_scores_gemma":[0.99964213,0.00013987785,0.000030500558,0.00008062002,0.00008597062,0.00002096171],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069151283,0.0007006183,0.00044869012,0.0010751483,0.00045080303,0.0015798827,0.0010072067,0.0009115461,0.010219023],"category_scores_gemma":[0.0015887688,0.0002692506,0.0005125893,0.0014647704,0.00040580682,0.0014132417,0.0012765657,0.00069269945,0.0042934944],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061888364,0.0001466205,0.0015664283,0.000540274,0.000053410415,0.00049898506,0.0004698012,0.02680234,0.012296631,0.14401376,0.029035622,0.7845143],"study_design_scores_gemma":[0.000028190632,0.00007820917,0.0018527017,0.00025893885,0.00007829454,0.0006319408,0.00018408107,0.17825802,0.010043534,0.19545577,0.61309046,0.000039795825],"about_ca_topic_score_codex":0.0006375743,"about_ca_topic_score_gemma":0.0010891878,"teacher_disagreement_score":0.010219023,"about_ca_system_score_codex":0.0003599169,"about_ca_system_score_gemma":0.00028538267,"threshold_uncertainty_score":0.034186006},"labels":[],"label_agreement":null},{"id":"W2317345966","doi":"10.1061/40513(279)93","title":"A Computer Model for Scheduling of Highway Construction","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Duration (music); Scheduling (production processes); Computer science; Construction management; Transport engineering; Operations research; Engineering; Civil engineering; Operations management","score_opus":0.010341392935148514,"score_gpt":0.20001911964364144,"score_spread":0.18967772670849292,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2317345966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043531593,0.00038010793,0.9155847,0.0006439172,0.000118182994,0.0002763257,0.0011512969,0.0010312567,0.037282646],"genre_scores_gemma":[0.6481933,0.0012848346,0.30866084,0.00020763162,0.00008966427,0.001619492,0.0019011627,0.0003304425,0.037712652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959,0.000112094465,0.000020630474,0.00008941434,0.00012208083,0.000065720014],"domain_scores_gemma":[0.99944,0.00030126979,0.00005904353,0.000043294753,0.00011047145,0.00004580751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005009312,0.00075141195,0.0007626775,0.00050999876,0.00071105483,0.0016841706,0.0016509017,0.0013139847,0.010550698],"category_scores_gemma":[0.0014412784,0.00048916397,0.00085730787,0.0009958138,0.0007694433,0.0011743865,0.00050991564,0.0009822348,0.0012205272],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020662894,0.00001744328,0.00015287654,0.000020983163,0.0000059209556,0.000023846686,0.00001957951,0.9799565,0.00030524458,0.0166565,0.00050892925,0.002311535],"study_design_scores_gemma":[0.00001999722,0.0000128402635,0.000057936813,0.0000040812356,0.0000064147976,0.00000851653,0.000007457095,0.9932371,0.00012850093,0.0042212247,0.002291779,0.000004193888],"about_ca_topic_score_codex":0.030205654,"about_ca_topic_score_gemma":0.019520087,"teacher_disagreement_score":0.030205654,"about_ca_system_score_codex":0.0022530798,"about_ca_system_score_gemma":0.0035631373,"threshold_uncertainty_score":0.060059726},"labels":[],"label_agreement":null},{"id":"W2318705081","doi":"10.1061/9780784413029.068","title":"Spatio-Temporal Progress Estimation for Highway Construction","year":2013,"lang":"en","type":"article","venue":"Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Computer science; Global Positioning System; Scheduling (production processes); Track (disk drive); Transport engineering; Project management; Operations research; Systems engineering; Engineering; Telecommunications; Operations management","score_opus":0.007240007372470643,"score_gpt":0.2043342078940571,"score_spread":0.19709420052158647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318705081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13101237,0.00040883952,0.8611797,0.00012673208,0.00003603988,0.00010339024,0.0017830582,0.002482148,0.002867757],"genre_scores_gemma":[0.81652045,0.00039027628,0.17889363,0.000010971005,0.000028154907,0.00013178805,0.0021332256,0.00009737182,0.0017941011],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995396,0.00008293517,0.00003679724,0.00012869542,0.00017748028,0.000034579614],"domain_scores_gemma":[0.9988544,0.00033139315,0.00029685866,0.00012662212,0.00032634588,0.00006436215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009347087,0.00076138094,0.0004161022,0.003321394,0.00034261125,0.00064849807,0.0005561657,0.00037984108,0.001709683],"category_scores_gemma":[0.0034550782,0.00038398596,0.0005123851,0.0025025548,0.0002693841,0.00093258714,0.0007381109,0.00042437378,0.0006629889],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000182314,0.00008287249,0.02683199,0.00015251583,0.00007549858,0.0001409117,0.00016055693,0.81163186,0.0052390518,0.0055667497,0.0015627529,0.14837292],"study_design_scores_gemma":[0.0000029149212,0.0000196423,0.0035740344,0.000007673644,0.00001064332,0.000029770898,0.00003890982,0.99312747,0.0011629257,0.0009550356,0.0010620254,0.000009058568],"about_ca_topic_score_codex":0.014713316,"about_ca_topic_score_gemma":0.013870802,"teacher_disagreement_score":0.014713316,"about_ca_system_score_codex":0.0006061416,"about_ca_system_score_gemma":0.0008209371,"threshold_uncertainty_score":0.02925533},"labels":[],"label_agreement":null},{"id":"W2318836624","doi":"10.1061/40704(2003)23","title":"Changes and the Unchangeable: Computers in Construction","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Sketch; Computer science; Engineering ethics; Architectural engineering; Data science; Construction engineering; Risk analysis (engineering); Engineering; Business","score_opus":0.006713060257665344,"score_gpt":0.1711554156367186,"score_spread":0.16444235537905325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2318836624","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05582897,0.17324182,0.0148693,0.20872574,0.0029303955,0.00004553343,0.0000792684,0.00024249806,0.5440365],"genre_scores_gemma":[0.85426056,0.07616095,0.0077960426,0.016136272,0.0017667665,0.0000727107,0.000059404145,0.0001260417,0.04362141],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99784565,0.0010570437,0.00007312922,0.0002493062,0.00058813876,0.00018671386],"domain_scores_gemma":[0.9986203,0.0007126447,0.0001064725,0.00015188238,0.00026659397,0.00014218532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016456329,0.00027633912,0.00021204604,0.0010531297,0.0032021378,0.0074790586,0.00060731574,0.0021410792,0.0044331485],"category_scores_gemma":[0.0027070208,0.00021546117,0.00016834364,0.0018580792,0.016786506,0.01185062,0.0034903784,0.0030538172,0.0006170371],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057252888,0.000046430774,0.0023122674,0.00021326363,0.000011537931,0.00041430583,0.024754936,0.0007922232,0.00060362,0.7692744,0.02701847,0.17450139],"study_design_scores_gemma":[0.000005780859,0.000036104157,0.0030876459,0.00035433864,0.000008793103,0.0005861991,0.014250898,0.0003674254,0.0003123564,0.12723903,0.8537258,0.000025575035],"about_ca_topic_score_codex":0.0112792,"about_ca_topic_score_gemma":0.0127986865,"teacher_disagreement_score":0.0112792,"about_ca_system_score_codex":0.0042018406,"about_ca_system_score_gemma":0.0024260343,"threshold_uncertainty_score":0.030486643},"labels":[],"label_agreement":null},{"id":"W2319056016","doi":"10.1061/9780784413517.008","title":"Estimating the Size of Temporary Facilities in Construction Site Layout Planning Using Simulation","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Duration (music); Process (computing); Task (project management); Estimation; Resource (disambiguation); Economic shortage; Work (physics); Space (punctuation); Site planning; Productivity; Simulation modeling; Industrial engineering; Operations research; Systems engineering; Engineering; Civil engineering","score_opus":0.04771770382829251,"score_gpt":0.3299777864641125,"score_spread":0.28226008263582003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2319056016","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09357744,0.0001142751,0.90415967,0.00004379658,0.000008664964,0.000058219917,0.00013272805,0.00029684437,0.0016084012],"genre_scores_gemma":[0.8155033,0.00018421233,0.18354441,0.000007223555,0.0000047186695,0.00013632774,0.00018999896,0.00004843876,0.00038128608],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989988,0.00047544567,0.00006134856,0.00014029173,0.00020765692,0.00011646687],"domain_scores_gemma":[0.9966536,0.0022880188,0.00039820085,0.00028006855,0.00026079977,0.00011930415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016488039,0.0006444446,0.0007479706,0.0014353059,0.00043035933,0.0008905174,0.0010206404,0.00069895544,0.00091851735],"category_scores_gemma":[0.004895219,0.00069114065,0.00079784985,0.0014526767,0.0005990641,0.0012519301,0.0010107524,0.0005198479,0.00014799769],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019764786,0.000011716672,0.001961308,0.000018644823,0.00000718567,0.0000144041405,0.0000309205,0.98993087,0.0007939599,0.0011645145,0.0000379786,0.0060087475],"study_design_scores_gemma":[0.0000021596836,0.000022711918,0.00086624036,0.000007661667,0.0000071634017,0.00001545329,0.000023940755,0.9972017,0.0008012112,0.0007359487,0.00030631165,0.000009570929],"about_ca_topic_score_codex":0.010939355,"about_ca_topic_score_gemma":0.010550803,"teacher_disagreement_score":0.010939355,"about_ca_system_score_codex":0.00097537175,"about_ca_system_score_gemma":0.0013573548,"threshold_uncertainty_score":0.021751344},"labels":[],"label_agreement":null},{"id":"W2320184521","doi":"10.22260/isarc2011/0051","title":"Multi-Agent-Based Approach for Real-Time Collision Avoidance and Path Re-Planning on Construction Sites","year":2011,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Institut de Recherche Robert-Sauvé en Santé et en Sécurité du Travail","keywords":"Collision avoidance; Computer science; Negotiation; Motion planning; Collision; Path (computing); Download; Multi-agent system; Operations research; Control (management); Work (physics); Distributed computing; Computer security; Artificial intelligence; Engineering; Computer network; World Wide Web; Robot","score_opus":0.02949921104512663,"score_gpt":0.22026230240551437,"score_spread":0.19076309136038774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320184521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023363302,0.00017516452,0.9716082,0.000120782584,0.000049214847,0.000107386404,0.000030353836,0.0007980261,0.0037475282],"genre_scores_gemma":[0.43544957,0.00018884824,0.55734557,0.000053908716,0.000017350432,0.00024080354,0.00009472325,0.000089095825,0.006520094],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969196,0.00010691018,0.00001926224,0.000052116884,0.00009541491,0.000034255023],"domain_scores_gemma":[0.9997434,0.000084438645,0.000031579482,0.000037252757,0.000069833135,0.000033513017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00056363473,0.0005493881,0.000727878,0.0005719275,0.0008613614,0.0009795611,0.0014810284,0.0010024604,0.002046132],"category_scores_gemma":[0.00068768667,0.00042909864,0.00062398834,0.00042413818,0.00043746782,0.0007108583,0.0010619254,0.0006624903,0.00041356444],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015758796,0.00018373068,0.00071530405,0.000119335076,0.00008816923,0.00036715606,0.00026116334,0.8608379,0.017449528,0.012233734,0.001906488,0.10567994],"study_design_scores_gemma":[0.000015580155,0.000022723625,0.00010909618,0.0000043515834,0.000013155816,0.00002890932,0.000028924516,0.9942222,0.0017097119,0.0013462701,0.0024913957,0.000007658337],"about_ca_topic_score_codex":0.005745028,"about_ca_topic_score_gemma":0.007710956,"teacher_disagreement_score":0.005745028,"about_ca_system_score_codex":0.00061691774,"about_ca_system_score_gemma":0.0011001225,"threshold_uncertainty_score":0.011423171},"labels":[],"label_agreement":null},{"id":"W2320721741","doi":"10.3130/aija.77.775","title":"METHODS OF ESTIMATING EXTERIOR LIFE CYCLE REPAIR COST AND OPTIMIZING THE ANNUAL RENEWAL INVESTMENT FOR A GROUP OF FACILITIES","year":2012,"lang":"en","type":"article","venue":"Journal of Architecture and Planning (Transactions of AIJ)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Bell (Canada)","funders":"","keywords":"Investment (military); Order (exchange); Operations management; Reliability engineering; Appropriation; Flexibility (engineering); Engineering; Business; Mathematics; Finance; Statistics","score_opus":0.015790620829954347,"score_gpt":0.27343381077760903,"score_spread":0.25764318994765467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2320721741","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005613175,0.00008985384,0.9931803,0.00002018449,0.0000068753693,0.000049460803,0.000039631028,0.00015572403,0.00084486994],"genre_scores_gemma":[0.13214248,0.00027875951,0.8657041,0.0000119539445,0.000016286756,0.00029026045,0.00020536686,0.00011331813,0.0012374528],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99861443,0.00044306205,0.000101265636,0.0002456409,0.0005112283,0.00008434652],"domain_scores_gemma":[0.9985259,0.00051428116,0.00021890366,0.00017002787,0.0005306543,0.000040293715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019578778,0.0010638746,0.00090064964,0.0024631768,0.0004359982,0.0010652777,0.0013336404,0.0005821014,0.0018363562],"category_scores_gemma":[0.004623668,0.00057822425,0.0007640022,0.0016518539,0.00034240686,0.0013061714,0.0004786425,0.0006137866,0.000371759],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009476896,0.00009006563,0.00565198,0.00022988056,0.000072593524,0.000040190553,0.00010273162,0.6266781,0.0062888237,0.016281223,0.0013488712,0.34312075],"study_design_scores_gemma":[0.00001373627,0.000049852184,0.0030491978,0.00002597217,0.000055238936,0.000085318476,0.000039964514,0.9801853,0.008664627,0.0047946307,0.002998374,0.000037872265],"about_ca_topic_score_codex":0.0059284694,"about_ca_topic_score_gemma":0.0063200067,"teacher_disagreement_score":0.0059284694,"about_ca_system_score_codex":0.0015401241,"about_ca_system_score_gemma":0.0017093006,"threshold_uncertainty_score":0.011787891},"labels":[],"label_agreement":null},{"id":"W2321010814","doi":"10.1139/cjce-2013-0103","title":"Modeling the impact of work-zone traffic flows upon concrete construction: a high level architecture based simulation framework","year":2013,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Stantec (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Computer science; Work (physics); Domain (mathematical analysis); Traffic flow (computer networking); Architecture; Resource (disambiguation); Traffic congestion; Transport engineering; Construction engineering; Civil engineering; Engineering; Computer network","score_opus":0.010078878819094516,"score_gpt":0.19296333697321963,"score_spread":0.1828844581541251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2321010814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22631039,0.00020119373,0.7482655,0.00039781138,0.000045509325,0.00014181109,0.0002570159,0.00034203747,0.0240387],"genre_scores_gemma":[0.89712447,0.00034443854,0.09806505,0.0000374711,0.00002057993,0.0002006536,0.0002000504,0.000056065535,0.00395123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978215,0.00008249991,0.000009316766,0.000025971463,0.00004710338,0.0000530027],"domain_scores_gemma":[0.9997737,0.000099422454,0.000033238004,0.000017294986,0.000039886632,0.000036424786],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046392818,0.00064609246,0.00051997846,0.00076375576,0.0006226069,0.0012170218,0.0013461398,0.0011434545,0.0021925026],"category_scores_gemma":[0.000752698,0.0003888651,0.00094055437,0.0007225815,0.0010114363,0.00094641215,0.0012879868,0.00089310604,0.00021080686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000004048194,0.000011669527,0.00030888958,0.000005268955,0.0000046409414,0.000012861331,0.000012192656,0.99331677,0.0003427805,0.0052326014,0.000033833912,0.00071438967],"study_design_scores_gemma":[0.0000022699755,0.0000061476558,0.00007900272,0.0000017473294,0.0000029627306,0.0000029443431,0.00000824515,0.998492,0.00008439201,0.0010933456,0.00022486708,0.000002052008],"about_ca_topic_score_codex":0.023974612,"about_ca_topic_score_gemma":0.019389361,"teacher_disagreement_score":0.023974612,"about_ca_system_score_codex":0.0014512091,"about_ca_system_score_gemma":0.0024662884,"threshold_uncertainty_score":0.047670126},"labels":[],"label_agreement":null},{"id":"W2322013815","doi":"10.3722/cadaps.2012.795-810","title":"Conceptual Design of Hemp Fibre Production Lines in Virtual Environments","year":2012,"lang":"en","type":"article","venue":"Computer-Aided Design and Applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; McGill University","funders":"University of Minnesota","keywords":"Conceptual design; Production (economics); Computer science; Human–computer interaction","score_opus":0.022673958385139963,"score_gpt":0.2145165645416944,"score_spread":0.19184260615655443,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322013815","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058711845,0.00007916244,0.92255783,0.000096870564,0.000039172704,0.0002595149,0.0000794428,0.00080919365,0.017366985],"genre_scores_gemma":[0.55729485,0.00018069733,0.42911854,0.00002179149,0.00000785804,0.00038583262,0.000109822904,0.00019012776,0.012690468],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993304,0.00015102926,0.00003250457,0.000103728154,0.00031922804,0.000063074345],"domain_scores_gemma":[0.99959725,0.00010589816,0.00006639,0.00007973846,0.00009071711,0.000060068523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008057645,0.0007125414,0.0002493257,0.0005062319,0.00065697863,0.0016926064,0.0013456745,0.00083454937,0.007396314],"category_scores_gemma":[0.0010904543,0.0005229087,0.00044630026,0.0003052127,0.0008705404,0.0011226739,0.0011104881,0.00044646705,0.0010455995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020525811,0.00023134088,0.0015507508,0.00030388864,0.000027350157,0.0012175848,0.001417136,0.71659654,0.07888901,0.07890994,0.0018007716,0.118850395],"study_design_scores_gemma":[0.000085318294,0.0006788018,0.002046128,0.0001137685,0.00003672102,0.0006927215,0.00074084266,0.8680928,0.041254397,0.019257328,0.0669018,0.0000993783],"about_ca_topic_score_codex":0.0016068744,"about_ca_topic_score_gemma":0.0019918147,"teacher_disagreement_score":0.007396314,"about_ca_system_score_codex":0.00073035265,"about_ca_system_score_gemma":0.00086827093,"threshold_uncertainty_score":0.02474314},"labels":[],"label_agreement":null},{"id":"W2322082723","doi":"10.1139/cjce-2014-0019","title":"Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization","year":2014,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Documentation; Computer science; Visualization; 3D printing; Computer Aided Design; CAD; Rework; Information model; Identification (biology); Engineering drawing; Human–computer interaction; Software engineering; Engineering; Artificial intelligence; Mechanical engineering","score_opus":0.00470539608065611,"score_gpt":0.16914281480783974,"score_spread":0.16443741872718362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322082723","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.81379825,0.0021163356,0.123282835,0.0011538545,0.00023400856,0.00040902972,0.00043317233,0.0016318033,0.05694071],"genre_scores_gemma":[0.928646,0.0008028904,0.066375636,0.000109416,0.000044902394,0.000111467256,0.00019977213,0.00016814866,0.0035417485],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.98899764,0.004223819,0.0005027947,0.00099192,0.0049139345,0.00036980247],"domain_scores_gemma":[0.967202,0.022697374,0.0026267876,0.0038257425,0.0029657532,0.0006823672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062938225,0.0011288298,0.000640198,0.0022654235,0.0008092403,0.007335073,0.0017029236,0.0015273227,0.0055862498],"category_scores_gemma":[0.035855267,0.00056885317,0.0006760661,0.0024808685,0.0018903483,0.0047345194,0.003167189,0.0010190274,0.0015184308],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039602458,0.0017166019,0.036017522,0.001940811,0.00020559145,0.00053395523,0.015161221,0.03175557,0.14259145,0.027685309,0.005332095,0.7330996],"study_design_scores_gemma":[0.00067296455,0.011192408,0.26263252,0.0015886615,0.0007026211,0.0026553818,0.012654658,0.27776852,0.30854395,0.034834694,0.085571125,0.0011823947],"about_ca_topic_score_codex":0.0055513093,"about_ca_topic_score_gemma":0.0039448505,"teacher_disagreement_score":0.007335073,"about_ca_system_score_codex":0.0014155417,"about_ca_system_score_gemma":0.0015985628,"threshold_uncertainty_score":0.03328532},"labels":[],"label_agreement":null},{"id":"W2322368403","doi":"10.1061/40794(179)78","title":"A Hybrid Neural Network for Predicting Construction Labour Productivity","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Artificial neural network; Productivity; Computer science; Artificial intelligence; Machine learning; Fuzzy logic; Computational intelligence; Neuro-fuzzy; Construction industry; Genetic algorithm; Fuzzy control system; Engineering; Economics","score_opus":0.007080383583689841,"score_gpt":0.19785762190178346,"score_spread":0.19077723831809362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322368403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15560631,0.00078826136,0.83583343,0.00026063467,0.00010213378,0.00006486448,0.00041704907,0.00093134894,0.0059959413],"genre_scores_gemma":[0.88612324,0.00044629344,0.10923273,0.000054805863,0.000044880584,0.00016436783,0.00032526988,0.000028719793,0.003579614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997485,0.00006488113,0.00001449639,0.00006205377,0.00008139392,0.000028573426],"domain_scores_gemma":[0.999655,0.00019113923,0.00003402335,0.00001757459,0.00008959283,0.000012564078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007434127,0.00060449215,0.0004212939,0.0010006359,0.00021429276,0.0006063788,0.0007891569,0.0007911918,0.0015401571],"category_scores_gemma":[0.0020132966,0.00021999303,0.00034105484,0.0011132546,0.00021369758,0.00087586907,0.00034387174,0.000498224,0.0003295794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011999146,0.000060271257,0.003493603,0.000049681676,0.000055414665,0.000050462844,0.0000272928,0.89969206,0.0020354001,0.0018821033,0.00066695595,0.091866754],"study_design_scores_gemma":[0.0000029340958,0.000011233828,0.00042581325,0.000003575352,0.000005472201,0.000005883605,0.0000031464028,0.9985875,0.00030055273,0.0004985704,0.00015194491,0.0000034679915],"about_ca_topic_score_codex":0.009514156,"about_ca_topic_score_gemma":0.0072187698,"teacher_disagreement_score":0.009514156,"about_ca_system_score_codex":0.0007383311,"about_ca_system_score_gemma":0.00043760712,"threshold_uncertainty_score":0.01891756},"labels":[],"label_agreement":null},{"id":"W2322800104","doi":"10.1061/40937(261)29","title":"Hybrid System Dynamics and Discrete Event Simulation for Construction Management","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Computer science; Context (archaeology); Event (particle physics); Representation (politics); Context model; Construction management; Construction industry; Simulation modeling; Realm; Systems engineering; Industrial engineering; Construction engineering; Simulation; Engineering; Civil engineering; Artificial intelligence; Mathematics","score_opus":0.004086516114753595,"score_gpt":0.2120911575931887,"score_spread":0.2080046414784351,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2322800104","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006150429,0.00073779316,0.9800229,0.0007050429,0.00015361108,0.000058315254,0.00008007703,0.00034452105,0.011747332],"genre_scores_gemma":[0.6652158,0.0026954769,0.3218962,0.00028710102,0.00019137657,0.0005991156,0.0003258183,0.00011725232,0.008671937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99925166,0.00041480633,0.000035238972,0.00006365163,0.00019908624,0.00003555487],"domain_scores_gemma":[0.99918884,0.00056937186,0.000048359005,0.000064129024,0.000084913336,0.000044399447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00094998756,0.0006465351,0.0007494186,0.00063415535,0.0004992868,0.0014484125,0.000930356,0.0011334912,0.004272624],"category_scores_gemma":[0.0021083732,0.00029800137,0.00074250397,0.000721359,0.00096693204,0.0014582229,0.0013310221,0.0013040048,0.00048516807],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034294702,0.000035176043,0.0005425335,0.000076383556,0.00005045848,0.000087736174,0.000091514215,0.75194544,0.0007247373,0.22861241,0.0011705662,0.016628725],"study_design_scores_gemma":[0.000011836417,0.00002165351,0.00008928621,0.000016724944,0.000008264553,0.000017927578,0.000028780232,0.9432862,0.00025417135,0.050047297,0.0062063,0.000011557485],"about_ca_topic_score_codex":0.0053993743,"about_ca_topic_score_gemma":0.0036927706,"teacher_disagreement_score":0.0053993743,"about_ca_system_score_codex":0.0011917964,"about_ca_system_score_gemma":0.001251762,"threshold_uncertainty_score":0.014293313},"labels":[],"label_agreement":null},{"id":"W2323174041","doi":"10.1061/40704(2003)18","title":"A Tale of Two SITIES","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Royal Academy of Engineering; York University","keywords":"Acronym; Information and Communications Technology; Architecture; Computer science; Business; Geography; World Wide Web","score_opus":0.005898392242679815,"score_gpt":0.19391154470638816,"score_spread":0.18801315246370834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323174041","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028950676,0.010823055,0.02403576,0.2289854,0.019052535,0.00018055698,0.0010199451,0.0010033838,0.6859488],"genre_scores_gemma":[0.3468213,0.0065610707,0.01657872,0.07052673,0.0042560017,0.0004665657,0.0013196926,0.0017523248,0.5517176],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.994218,0.0017271035,0.00026699883,0.0013825322,0.001323364,0.0010819426],"domain_scores_gemma":[0.99545884,0.0010709345,0.00027869354,0.0008584521,0.0011670539,0.0011659703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041535525,0.0012101706,0.0010067736,0.0032662025,0.011608354,0.012384256,0.0017828575,0.005154158,0.047497924],"category_scores_gemma":[0.011564634,0.00081942166,0.001174613,0.0033254595,0.01630062,0.018415421,0.012962496,0.010630637,0.012146007],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015847808,0.000054831904,0.0025864365,0.00026073807,0.00003841598,0.0004947102,0.02407505,0.00014583183,0.000567451,0.654542,0.25634417,0.060731906],"study_design_scores_gemma":[0.000013061384,0.000054657692,0.0012003926,0.00027726276,0.000011010491,0.00032823265,0.016320778,0.00013329728,0.0001777376,0.053052083,0.92838556,0.00004595832],"about_ca_topic_score_codex":0.0077896193,"about_ca_topic_score_gemma":0.01250679,"teacher_disagreement_score":0.047497924,"about_ca_system_score_codex":0.0044368138,"about_ca_system_score_gemma":0.0041639996,"threshold_uncertainty_score":0.15889639},"labels":[],"label_agreement":null},{"id":"W2323581470","doi":"10.1061/41052(346)51","title":"Developing a Bidding Game Using High Level Architecture","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Bidding; Computer science; Architecture; Construction bidding; Process (computing); High-level architecture; Real-time bidding; Simulation; Operations research; Process management; Software engineering; Systems engineering; Engineering; Project management; Operating system; Business; Marketing","score_opus":0.03398810860710106,"score_gpt":0.23771920005261485,"score_spread":0.2037310914455138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323581470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051423628,0.000031297095,0.93293065,0.00016178393,0.0000334792,0.0004171613,0.00004335456,0.0023079617,0.01265061],"genre_scores_gemma":[0.28782305,0.00010352798,0.7019848,0.00007631899,0.000007105206,0.0004504977,0.0001722498,0.00030337815,0.009079044],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995395,0.00018148423,0.000032292777,0.0000483608,0.00014638876,0.000051915686],"domain_scores_gemma":[0.9995515,0.00022339777,0.00002251206,0.00005682576,0.000094147625,0.000051666182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010497181,0.0005846881,0.0003522799,0.00033820796,0.00055826816,0.0010953294,0.0009873845,0.0008552701,0.0040436005],"category_scores_gemma":[0.001706992,0.00053733605,0.00065035676,0.00021550676,0.0005630616,0.0015392269,0.0012717678,0.0009481849,0.0007250665],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030276395,0.0010196288,0.0043426114,0.0004683099,0.00012042865,0.00097282766,0.002270483,0.6053687,0.067312874,0.15681799,0.0046957666,0.15630767],"study_design_scores_gemma":[0.000075508266,0.00016736815,0.00037632347,0.00002865271,0.000025271464,0.00014887594,0.000106062005,0.95376074,0.012285306,0.010856779,0.022142995,0.000026145177],"about_ca_topic_score_codex":0.0026661085,"about_ca_topic_score_gemma":0.003367848,"teacher_disagreement_score":0.0040436005,"about_ca_system_score_codex":0.0005512875,"about_ca_system_score_gemma":0.0011797228,"threshold_uncertainty_score":0.0135272145},"labels":[],"label_agreement":null},{"id":"W2323843643","doi":"10.1061/41020(339)50","title":"Virtual Supervision in Construction Projects","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia; University of Calgary","funders":"","keywords":"Popularity; Key (lock); Computer science; Focus (optics); Information flow; Construction industry; Construction management; Engineering management; Process management; Knowledge management; Engineering; Construction engineering; Computer security","score_opus":0.03109051985310798,"score_gpt":0.30286011757956055,"score_spread":0.2717695977264526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2323843643","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.633031,0.0015218394,0.26992503,0.0014988249,0.0001570451,0.00019756152,0.00012605998,0.0007206325,0.09282197],"genre_scores_gemma":[0.9840374,0.0002092262,0.012565836,0.000013651187,0.000009467413,0.000037386973,0.000031813295,0.000015707925,0.0030794644],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978356,0.0013093833,0.000056287015,0.00015819405,0.0004678703,0.00017280276],"domain_scores_gemma":[0.9990395,0.00024595673,0.00023330661,0.00012241419,0.00013738402,0.00022139959],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015335543,0.00020888091,0.00019223776,0.0004788705,0.00086548115,0.002104906,0.00048966106,0.0004687269,0.0033594894],"category_scores_gemma":[0.0028805428,0.00026058836,0.00019700178,0.00062880653,0.000993866,0.0013699555,0.002140299,0.00038488826,0.00033919862],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007664595,0.00047962298,0.03237943,0.0003414831,0.00004515937,0.0006988987,0.006136604,0.24577607,0.007851453,0.13636534,0.012905552,0.5562539],"study_design_scores_gemma":[0.0001789332,0.0015200693,0.05257857,0.000474606,0.000104197556,0.0014537645,0.013145548,0.6403786,0.009008969,0.13165623,0.14934234,0.00015813104],"about_ca_topic_score_codex":0.005181551,"about_ca_topic_score_gemma":0.005890815,"teacher_disagreement_score":0.005181551,"about_ca_system_score_codex":0.0012607895,"about_ca_system_score_gemma":0.0019470757,"threshold_uncertainty_score":0.011238635},"labels":[],"label_agreement":null},{"id":"W2324253937","doi":"10.1061/9780784413517.175","title":"Crew Cost and Productivity Performance Benchmarking Based on Commercial Cost Estimating Databases","year":2014,"lang":"en","type":"article","venue":"Construction Research Congress 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Drainage Services Department; National Science Council","keywords":"Benchmarking; Crew; Productivity; Computer science; Production (economics); Database; Operations research; Business; Engineering; Aeronautics; Marketing","score_opus":0.04578847942345049,"score_gpt":0.31607486575645144,"score_spread":0.27028638633300095,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2324253937","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35684457,0.0016079707,0.5647171,0.00078466104,0.00015403921,0.00097486586,0.017326456,0.005380018,0.052210446],"genre_scores_gemma":[0.8511749,0.00045415986,0.12716396,0.0000761917,0.00005925124,0.00075108063,0.018237775,0.00031963113,0.0017630267],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9843264,0.0052785813,0.0019182048,0.001578268,0.006324546,0.0005739597],"domain_scores_gemma":[0.963904,0.010526451,0.0039791744,0.00802989,0.013171091,0.00038928824],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011159489,0.0011338724,0.00088159944,0.008928887,0.0005787933,0.0039239414,0.002213042,0.00082014495,0.003505197],"category_scores_gemma":[0.044985555,0.00037277164,0.0006368455,0.015112341,0.00054925744,0.0039915596,0.0019421135,0.000726536,0.0009337518],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00072047213,0.0009942704,0.117193505,0.00096190005,0.00038623277,0.0002179156,0.00095857814,0.15371898,0.0063605667,0.05230734,0.023553807,0.6426265],"study_design_scores_gemma":[0.000110365116,0.0007831793,0.22305512,0.0005590136,0.00020599834,0.0004915944,0.0026005206,0.67561567,0.021765118,0.021728938,0.05283029,0.0002541313],"about_ca_topic_score_codex":0.013925081,"about_ca_topic_score_gemma":0.007891323,"teacher_disagreement_score":0.013925081,"about_ca_system_score_codex":0.0023241893,"about_ca_system_score_gemma":0.0019382742,"threshold_uncertainty_score":0.059017777},"labels":[],"label_agreement":null},{"id":"W2324386762","doi":"10.1061/41020(339)100","title":"Stakeholder Views on IT in Construction: A North American Perspective","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Resistance (ecology); Business; Productivity; Stakeholder; Work (physics); Construction industry; Unavailability; Knowledge management; Perspective (graphical); Information technology; Information and Communications Technology; Key (lock); Public relations; Engineering; Computer science; Construction engineering; Political science","score_opus":0.07589979151414869,"score_gpt":0.3389094073999082,"score_spread":0.26300961588575955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2324386762","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7343992,0.0062530874,0.0027133485,0.094948664,0.0003110745,0.00004401982,0.000060015464,0.000022310414,0.16124836],"genre_scores_gemma":[0.9885278,0.0032642728,0.00032992268,0.00402241,0.000047985726,0.00002130408,0.000013253246,0.0000075045846,0.0037656333],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9907449,0.005547013,0.00021429393,0.000261011,0.0017882905,0.0014446552],"domain_scores_gemma":[0.9927487,0.0034700178,0.0008095019,0.00014534888,0.0017320686,0.0010943493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007854503,0.00040597707,0.00037430858,0.0021427413,0.015105609,0.008072542,0.0010048901,0.0030005677,0.0033811165],"category_scores_gemma":[0.004087563,0.00035482785,0.00029022008,0.004342493,0.008344474,0.004743988,0.005400096,0.002820831,0.0002569589],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052122556,0.00015821171,0.021654531,0.00027963406,0.000019820694,0.0019602822,0.885494,0.0003268505,0.0012982736,0.05033154,0.009815766,0.02860891],"study_design_scores_gemma":[0.0000030818237,0.000035885885,0.009053572,0.0002679834,0.000012566701,0.0004481501,0.9336151,0.00019187103,0.00017975812,0.0028557666,0.05331034,0.00002588049],"about_ca_topic_score_codex":0.08345947,"about_ca_topic_score_gemma":0.12280257,"teacher_disagreement_score":0.08345947,"about_ca_system_score_codex":0.006967292,"about_ca_system_score_gemma":0.0069637,"threshold_uncertainty_score":0.16594738},"labels":[],"label_agreement":null},{"id":"W2325466647","doi":"10.1061/40475(278)59","title":"Multi-Dimensional Utility Model for Selection of a Trenchless Construction Method","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Western University","funders":"","keywords":"Trenchless technology; Computer science; Process (computing); Preference; Rank (graph theory); Modular design; Analytic hierarchy process; Selection (genetic algorithm); Ranking (information retrieval); Industrial engineering; Data mining; Operations research; Engineering; Machine learning; Mathematics","score_opus":0.022826677023372648,"score_gpt":0.2646715942432622,"score_spread":0.24184491721988954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2325466647","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026880546,0.000129094,0.9685602,0.00018520257,0.000013118714,0.00014729644,0.00014089186,0.00011594799,0.0038276708],"genre_scores_gemma":[0.7352338,0.00044763394,0.25432235,0.00007022469,0.000029775414,0.00089875347,0.0004072929,0.000083845014,0.0085063595],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99562424,0.0023868126,0.00015391113,0.0005033584,0.0010392495,0.0002924265],"domain_scores_gemma":[0.9962209,0.00261771,0.00034727145,0.00018042115,0.00049632834,0.00013743533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005447549,0.0009946437,0.0011598051,0.0024712144,0.00073470554,0.0028949124,0.0020109958,0.0010911411,0.0063179256],"category_scores_gemma":[0.0099448655,0.00058128196,0.0011982168,0.002663868,0.0011222631,0.002437135,0.0012635117,0.0010791138,0.0008444392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001222076,0.000070573224,0.0018391488,0.000062403065,0.000044563578,0.000120661454,0.00015303434,0.8975466,0.00052812387,0.07149886,0.0005051234,0.027508605],"study_design_scores_gemma":[0.000011650071,0.000028010894,0.00022180018,0.000008250438,0.0000087063745,0.000020146612,0.000021640146,0.9897814,0.0001491347,0.0091453595,0.0005920199,0.000011897763],"about_ca_topic_score_codex":0.007660142,"about_ca_topic_score_gemma":0.006007191,"teacher_disagreement_score":0.007660142,"about_ca_system_score_codex":0.0028779595,"about_ca_system_score_gemma":0.0015424443,"threshold_uncertainty_score":0.028809726},"labels":[],"label_agreement":null},{"id":"W2326381641","doi":"10.1061/40754(183)111","title":"Hierarchical Clustering for Interpretation of Spatial Configuration","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Cluster analysis; Outlier; Data mining; Field (mathematics); Set (abstract data type); Selection (genetic algorithm); Similarity (geometry); Silhouette; Reuse; Artificial intelligence; Machine learning; Engineering","score_opus":0.007229680297894978,"score_gpt":0.22254804318358382,"score_spread":0.21531836288568884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326381641","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00065993756,0.0003061736,0.9946641,0.00018868907,0.00004856248,0.00006605952,0.0004460164,0.0020114505,0.0016089862],"genre_scores_gemma":[0.037657205,0.0003287806,0.95785064,0.00016032733,0.000105158164,0.0002421822,0.0016744989,0.00057921774,0.0014019886],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9968466,0.0010727457,0.00021251763,0.0009003116,0.0008140528,0.00015381847],"domain_scores_gemma":[0.9963135,0.001603905,0.00038123867,0.00082517794,0.00079658214,0.000079608435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027292648,0.0018204075,0.0012234463,0.006216695,0.001864981,0.0032055778,0.0039648945,0.0023841395,0.008703272],"category_scores_gemma":[0.011365009,0.0010310663,0.0029835748,0.006493017,0.002200846,0.0028511432,0.0025473975,0.0031353184,0.0053873775],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017339567,0.0000838713,0.002449868,0.0009615392,0.00033460476,0.00036425464,0.001964777,0.14859906,0.007189769,0.41627392,0.04600796,0.37559703],"study_design_scores_gemma":[0.000027864535,0.000033076383,0.0018172825,0.00018460739,0.00004875802,0.00029005395,0.00039522498,0.5031777,0.0028372845,0.44341817,0.047676716,0.00009323775],"about_ca_topic_score_codex":0.015410337,"about_ca_topic_score_gemma":0.015213104,"teacher_disagreement_score":0.015410337,"about_ca_system_score_codex":0.003024322,"about_ca_system_score_gemma":0.0020544424,"threshold_uncertainty_score":0.030641258},"labels":[],"label_agreement":null},{"id":"W2326439135","doi":"10.1061/40652(2003)15","title":"Construction Schedule Visualization","year":2002,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Schedule; Visualization; Bar chart; Representation (politics); Drill; Data visualization; Artificial intelligence; Engineering","score_opus":0.01036873158125117,"score_gpt":0.19854771142778369,"score_spread":0.1881789798465325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326439135","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011099882,0.0004679768,0.7507192,0.00078215415,0.00042062334,0.00033594298,0.02274403,0.13496616,0.07846406],"genre_scores_gemma":[0.1833006,0.0016592364,0.70793253,0.00023679875,0.00017394811,0.00091036654,0.040533207,0.02211268,0.04314067],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994431,0.0001059972,0.00003241883,0.00006837862,0.00029817031,0.0000518171],"domain_scores_gemma":[0.9988387,0.00040925317,0.00007556891,0.00023340437,0.00035055494,0.000092443384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008492946,0.0011035915,0.0005198813,0.0026317341,0.0006234923,0.0018408728,0.0011615062,0.0006551785,0.06695702],"category_scores_gemma":[0.003041066,0.0005488874,0.0005378238,0.0021467274,0.00017977755,0.0014031549,0.0015161891,0.0012429772,0.0077664023],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004391443,0.00022662088,0.0029302333,0.0007940994,0.00005917168,0.00050662813,0.0015821292,0.043086607,0.013392947,0.036776625,0.4119436,0.48826218],"study_design_scores_gemma":[0.00011694585,0.000095848314,0.0030445575,0.00023335821,0.000043294112,0.00054916035,0.00049499125,0.15331653,0.015904112,0.020795977,0.80526716,0.00013815629],"about_ca_topic_score_codex":0.0050840583,"about_ca_topic_score_gemma":0.0065160906,"teacher_disagreement_score":0.06695702,"about_ca_system_score_codex":0.00042306143,"about_ca_system_score_gemma":0.0013473013,"threshold_uncertainty_score":0.22399354},"labels":[],"label_agreement":null},{"id":"W2326791358","doi":"10.1061/40475(278)42","title":"Reasoning about Construction Methods","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Schedule; Computer science; Process (computing); Context (archaeology); Selection (genetic algorithm); Operations research; Management science; Systems engineering; Risk analysis (engineering); Artificial intelligence; Engineering","score_opus":0.006900866195357872,"score_gpt":0.25329925611797577,"score_spread":0.2463983899226179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2326791358","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006641955,0.0013256175,0.9583723,0.0038856573,0.00022238406,0.0004762832,0.00062096736,0.00048916356,0.02796562],"genre_scores_gemma":[0.115065485,0.0018320809,0.873393,0.0008544924,0.00032794566,0.0006522379,0.0016501495,0.00021293765,0.006011661],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97151357,0.0120050525,0.003575737,0.0032535323,0.008091638,0.0015604278],"domain_scores_gemma":[0.9529386,0.035628468,0.0022379132,0.004858283,0.0036446645,0.00069200195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025713345,0.0021209822,0.0016246298,0.005510821,0.0038513478,0.013424687,0.0065193363,0.005904625,0.014169768],"category_scores_gemma":[0.053610336,0.001617338,0.0056280578,0.004509093,0.010364874,0.020150026,0.0068832072,0.0057775206,0.0022063544],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007587501,0.00008761054,0.0012758308,0.0007275936,0.00014075833,0.00067836716,0.0017051895,0.019655364,0.0006817649,0.9254014,0.005103348,0.04446699],"study_design_scores_gemma":[0.000054792574,0.000031007057,0.00015852005,0.00033318947,0.00005811257,0.00032438876,0.00065435783,0.03043421,0.0010891531,0.92310464,0.043716665,0.000040899038],"about_ca_topic_score_codex":0.004565431,"about_ca_topic_score_gemma":0.004838464,"teacher_disagreement_score":0.025713345,"about_ca_system_score_codex":0.004065594,"about_ca_system_score_gemma":0.0036965548,"threshold_uncertainty_score":0.13598675},"labels":[],"label_agreement":null},{"id":"W2327441640","doi":"10.1061/41020(339)95","title":"Mapping Actors and Roles in Construction Knowledge","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Process (computing); Knowledge management; Computer science; Product (mathematics); Root (linguistics); Data science","score_opus":0.027117524557713477,"score_gpt":0.30201813461459853,"score_spread":0.27490061005688504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2327441640","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07884422,0.0013984604,0.8142405,0.0035395527,0.000117923104,0.00034809188,0.00027776056,0.00022538399,0.10100813],"genre_scores_gemma":[0.67577684,0.0014812318,0.3140323,0.00021565951,0.00002424909,0.0004730393,0.0005079559,0.00007673241,0.0074120103],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9947114,0.0033114397,0.0003974874,0.00053086464,0.00072706334,0.0003217717],"domain_scores_gemma":[0.99660385,0.0021217735,0.00027220475,0.0005119053,0.00034489,0.00014544706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005564991,0.0006325696,0.00035988243,0.0073163793,0.002682534,0.0065532573,0.0008949673,0.0017051444,0.0031870082],"category_scores_gemma":[0.008529229,0.000598119,0.00075094163,0.005238782,0.006474783,0.013960948,0.004465176,0.0014355431,0.00043510203],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002299776,0.000017339897,0.0017110193,0.00007960796,0.000008087938,0.00013853282,0.009858601,0.0027294776,0.0006487986,0.9575149,0.0005481293,0.026722457],"study_design_scores_gemma":[0.000016253862,0.000019192976,0.0024358553,0.00039665424,0.000038588725,0.00031203005,0.026467092,0.024134824,0.0015580449,0.8626655,0.081919074,0.000036956397],"about_ca_topic_score_codex":0.013135815,"about_ca_topic_score_gemma":0.012586395,"teacher_disagreement_score":0.013135815,"about_ca_system_score_codex":0.00402881,"about_ca_system_score_gemma":0.0035594092,"threshold_uncertainty_score":0.029430807},"labels":[],"label_agreement":null},{"id":"W2327525975","doi":"10.1061/41020(339)131","title":"Modeling Architecture for Hybrid System Dynamics and Discrete Event Simulation","year":2009,"lang":"en","type":"article","venue":"Construction Research Congress 2009","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"High-level architecture; Computer science; Context (archaeology); Architecture; Hybrid system; Discrete event simulation; Systems engineering; Set (abstract data type); Systems architecture; Event (particle physics); Distributed computing; System dynamics; Software engineering; Industrial engineering; Simulation; Engineering; Artificial intelligence; Interoperability; Operating system","score_opus":0.018150031172450697,"score_gpt":0.3002952469232337,"score_spread":0.28214521575078305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2327525975","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025715495,0.00004526451,0.9930205,0.00009510655,0.000022045271,0.00006261789,0.000044366927,0.0007688615,0.0033696375],"genre_scores_gemma":[0.2643437,0.00036683067,0.7263997,0.00009994035,0.000049352435,0.00096320594,0.0004971611,0.00023656231,0.0070434776],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989779,0.00042752444,0.000089918845,0.00014209226,0.00029809517,0.00006447781],"domain_scores_gemma":[0.99923587,0.00032082142,0.00006447368,0.00013278562,0.0001984865,0.000047691898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016943394,0.0008192389,0.0006199651,0.0007212699,0.00056696945,0.0017046634,0.001865061,0.0011947431,0.0061926143],"category_scores_gemma":[0.0024020497,0.0006022786,0.0012196986,0.0005542952,0.00082491274,0.0016745493,0.001937021,0.0012880873,0.0011220681],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043500168,0.000043703458,0.0008418722,0.000081395985,0.00005994796,0.00008412855,0.00015588843,0.80844104,0.0021249761,0.16414571,0.0009993038,0.022978503],"study_design_scores_gemma":[0.000014091289,0.000019733627,0.00007361927,0.0000117609425,0.000012468663,0.00002032446,0.000016035554,0.9719089,0.0006590217,0.019874696,0.0073808795,0.000008414261],"about_ca_topic_score_codex":0.004409902,"about_ca_topic_score_gemma":0.0034052427,"teacher_disagreement_score":0.0061926143,"about_ca_system_score_codex":0.0010676973,"about_ca_system_score_gemma":0.001477383,"threshold_uncertainty_score":0.02071637},"labels":[],"label_agreement":null},{"id":"W2328463100","doi":"10.1061/40937(261)57","title":"Sustainability, Whole Life Costs, and Information and Communication Technologies: A Review of Published Works","year":2007,"lang":"en","type":"review","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Sustainability; Information and Communications Technology; Process (computing); Process management; Work (physics); Computer science; Knowledge management; Business; Risk analysis (engineering); Management science; Engineering","score_opus":0.013092416625493597,"score_gpt":0.2744787536745247,"score_spread":0.2613863370490311,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328463100","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013520493,0.99883944,0.00008121993,0.00012883813,0.00008289422,0.0000035451153,0.000011985469,0.0000027219062,0.000714082],"genre_scores_gemma":[0.0008818626,0.9985507,0.00016894429,0.00008618574,0.00007574348,0.0000073510587,0.000016087102,0.0000012566035,0.00021181551],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9987061,0.00026367008,0.0002064933,0.0001692746,0.00059893046,0.000055480432],"domain_scores_gemma":[0.9959715,0.0027495308,0.00044108502,0.00006456245,0.0006973018,0.000075981225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017190793,0.0011631597,0.0025293808,0.009018967,0.000599381,0.0025117944,0.0011098387,0.001678161,0.0046473304],"category_scores_gemma":[0.0034827192,0.0006509173,0.0009016937,0.01778651,0.0008805702,0.0034755592,0.00079093245,0.0010101666,0.0014086445],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006722813,0.00008951453,0.0006102705,0.071231715,0.00022291314,0.00023585197,0.0003364723,0.0005557941,0.0005475513,0.004343811,0.016756715,0.9050022],"study_design_scores_gemma":[0.000019862044,0.00014584398,0.0047822543,0.0520776,0.00066136674,0.0017470726,0.0010130918,0.00017892658,0.0005588564,0.0045142756,0.93424135,0.00005945073],"about_ca_topic_score_codex":0.0039409907,"about_ca_topic_score_gemma":0.0070517724,"teacher_disagreement_score":0.009018967,"about_ca_system_score_codex":0.0013335071,"about_ca_system_score_gemma":0.003914394,"threshold_uncertainty_score":0.015546918},"labels":[],"label_agreement":null},{"id":"W2328576025","doi":"10.1142/9789812701480_0091","title":"INNOVATIVE DESIGN AND CONSTRUCTION TECHNOLOGIES FOR BUILDING INTERNAL PARTITIONS FOR SUPER HI-RISE BUILDINGS ON AN INTERNATIONAL BASIS","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Basis (linear algebra); Architectural engineering; Computer science; Construction engineering; Engineering; Mathematics; Geometry","score_opus":0.017404854726745335,"score_gpt":0.25650745394721464,"score_spread":0.2391025992204693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328576025","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.101624936,0.00061407895,0.84000874,0.0002497325,0.00014506199,0.00008686692,0.000089624875,0.000508874,0.056671973],"genre_scores_gemma":[0.6056206,0.00048087636,0.3803234,0.000056648547,0.00003105796,0.000101937345,0.00022528585,0.00015550514,0.013004765],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99940217,0.00013728614,0.000021013751,0.000060221864,0.00030338299,0.00007601295],"domain_scores_gemma":[0.9998241,0.000025578958,0.000015427313,0.000044698092,0.00007315642,0.00001710983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000678775,0.0005695104,0.00030341337,0.0007429655,0.00043634253,0.0014067328,0.00083153456,0.0005076438,0.0037847564],"category_scores_gemma":[0.0004965707,0.00030416116,0.00046391686,0.0007762749,0.0006119702,0.0014208509,0.0010771875,0.00062610046,0.00082704495],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002725686,0.00025359273,0.005083356,0.0005728975,0.00006339474,0.00039605243,0.001941392,0.09815814,0.21607476,0.19258577,0.005076191,0.47952187],"study_design_scores_gemma":[0.00012019333,0.0012724794,0.022436269,0.00032674504,0.00039076997,0.003958645,0.0033617336,0.35674813,0.2611874,0.062266245,0.28773347,0.00019791449],"about_ca_topic_score_codex":0.00060015643,"about_ca_topic_score_gemma":0.0022456048,"teacher_disagreement_score":0.0037847564,"about_ca_system_score_codex":0.00042140693,"about_ca_system_score_gemma":0.00065642165,"threshold_uncertainty_score":0.012661219},"labels":[],"label_agreement":null},{"id":"W2328794983","doi":"10.1061/40937(261)32","title":"Automated Code Compliance Checking of Building Envelope Performance","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Building envelope; Computer science; Envelope (radar); XML; Code (set theory); Building code; Building design; Building model; Building information modeling; Scheme (mathematics); Building automation; Software engineering; Architectural engineering; Engineering; Set (abstract data type); Programming language; Simulation; World Wide Web; Compatibility (geochemistry)","score_opus":0.021908408640592777,"score_gpt":0.25384597680307297,"score_spread":0.23193756816248018,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2328794983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.232218,0.00016463923,0.70100063,0.00017577311,0.00005316457,0.00036705306,0.00120631,0.05940103,0.005413434],"genre_scores_gemma":[0.73395735,0.00009499307,0.25878787,0.00008631617,0.000017651246,0.00024042958,0.0032173586,0.0015778398,0.0020201146],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99102074,0.0023252212,0.00070646073,0.0011950297,0.0044139274,0.00033866166],"domain_scores_gemma":[0.9720686,0.011676084,0.0035012625,0.0063449936,0.006184744,0.00022428592],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004083917,0.000730699,0.00090318214,0.0029113533,0.00063687214,0.0013309859,0.0012988991,0.00076096493,0.0023367174],"category_scores_gemma":[0.024732446,0.00038332396,0.00053095346,0.001419683,0.0007239008,0.0015288207,0.0011082962,0.0006339426,0.0013586676],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011059497,0.00058633543,0.033934187,0.00043884187,0.0001553504,0.00095898,0.0014656975,0.13181253,0.09050148,0.010309923,0.011408442,0.7173223],"study_design_scores_gemma":[0.00009320839,0.00020245514,0.011097742,0.00007201384,0.000055579727,0.00043583798,0.00021546715,0.7908775,0.17964226,0.005379374,0.011809284,0.00011914851],"about_ca_topic_score_codex":0.0056554284,"about_ca_topic_score_gemma":0.0030278594,"teacher_disagreement_score":0.0056554284,"about_ca_system_score_codex":0.00081992976,"about_ca_system_score_gemma":0.00220344,"threshold_uncertainty_score":0.0215981},"labels":[],"label_agreement":null},{"id":"W2330380178","doi":"10.1108/f-06-2014-0050","title":"Automated building information modeling for fault detection and diagnostics in commercial HVAC systems","year":2016,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"HVAC; Facility management; Building information modeling; Process (computing); Engineering; Fault detection and isolation; Benchmarking; Systems engineering; Computer science; Air conditioning; Operations management; Artificial intelligence","score_opus":0.011301135295024621,"score_gpt":0.20781817193504412,"score_spread":0.1965170366400195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2330380178","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07913991,0.00016940931,0.9095231,0.0002678923,0.000026870068,0.0002117045,0.0007673764,0.0034593444,0.0064343098],"genre_scores_gemma":[0.6713615,0.0002077393,0.32478806,0.000046573787,0.000009097359,0.00023273086,0.0011185142,0.00016295958,0.0020728433],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946445,0.00016627209,0.00003589722,0.00007834059,0.0002098043,0.000045228157],"domain_scores_gemma":[0.9991498,0.0004497312,0.00008996297,0.000119220895,0.00016737028,0.000023918745],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007346013,0.0006298859,0.00043507302,0.0013886767,0.0006503791,0.0016896712,0.00092313834,0.00081655715,0.0027622131],"category_scores_gemma":[0.002488689,0.0005692233,0.000963612,0.0008843109,0.00042539687,0.001174759,0.000993044,0.0006382628,0.00048349774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000067021414,0.00007121048,0.0021967657,0.00006625113,0.000019905445,0.00007750699,0.00017231697,0.9408503,0.002409045,0.0061320136,0.00072183803,0.04721581],"study_design_scores_gemma":[0.0000035810465,0.000009244104,0.00034972612,0.000007067242,0.0000045666334,0.000013619439,0.000030880667,0.99649435,0.00083384285,0.0012990384,0.0009491658,0.000004898156],"about_ca_topic_score_codex":0.023423845,"about_ca_topic_score_gemma":0.02428548,"teacher_disagreement_score":0.023423845,"about_ca_system_score_codex":0.0017094283,"about_ca_system_score_gemma":0.0018319085,"threshold_uncertainty_score":0.04657501},"labels":[],"label_agreement":null},{"id":"W2332618398","doi":"10.1061/9780784412329.078","title":"Providing Query Support to Leverage BIM for Construction","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Building information modeling; Leverage (statistics); Ontology; Flexibility (engineering); Software engineering; Systems engineering; Database; Data mining; Engineering; Artificial intelligence","score_opus":0.06356479648402116,"score_gpt":0.33905957800296765,"score_spread":0.27549478151894646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2332618398","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008054517,0.00012229977,0.9715595,0.0005065347,0.000022229153,0.0002653079,0.00060076267,0.013555126,0.005313757],"genre_scores_gemma":[0.21186268,0.00037769187,0.7790027,0.00040886886,0.00005806927,0.0003911744,0.0039684614,0.0018340086,0.0020963661],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9925251,0.0019924855,0.0008452761,0.0008212222,0.003376429,0.0004393936],"domain_scores_gemma":[0.99140817,0.0037380734,0.0005644551,0.0025527622,0.0015365855,0.0001999146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008202852,0.0011931146,0.0011532563,0.0027612112,0.0010771387,0.00515643,0.0029627008,0.0015703308,0.0042043654],"category_scores_gemma":[0.014703025,0.0008718399,0.0015486674,0.0023767496,0.0011593882,0.007167307,0.004527467,0.0014941791,0.0017340537],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008761508,0.00077051576,0.008735723,0.0013787211,0.00028957377,0.0020480084,0.009678379,0.06716257,0.070118375,0.26752922,0.040730976,0.53068185],"study_design_scores_gemma":[0.00013230817,0.00023251941,0.0019348561,0.00028678327,0.00016021202,0.0011283493,0.0018236069,0.67407006,0.061497528,0.091155775,0.16736248,0.00021540202],"about_ca_topic_score_codex":0.006453365,"about_ca_topic_score_gemma":0.006886644,"teacher_disagreement_score":0.008202852,"about_ca_system_score_codex":0.0013463597,"about_ca_system_score_gemma":0.002381784,"threshold_uncertainty_score":0.043381333},"labels":[],"label_agreement":null},{"id":"W2335275950","doi":"10.1061/40513(279)178","title":"Case-Based Reasoning System for Bridge Management","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministère des Transports","keywords":"Bridge (graph theory); Case-based reasoning; Computer science; Matching (statistics); Reliability (semiconductor); Similarity (geometry); Representation (politics); Adaptation (eye); Markov process; Data mining; Artificial intelligence; Machine learning; Image (mathematics)","score_opus":0.009529951091890657,"score_gpt":0.1966276123306065,"score_spread":0.18709766123871585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335275950","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032825305,0.0005177445,0.9596768,0.0009429075,0.00017734405,0.0008369562,0.0014533852,0.014816379,0.018295879],"genre_scores_gemma":[0.058356885,0.0006227673,0.92918575,0.00029038172,0.00009153575,0.0009627394,0.004041849,0.0002282349,0.0062199067],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972373,0.0009494098,0.00051226927,0.00040187218,0.00078240567,0.00011674716],"domain_scores_gemma":[0.99743444,0.0012227809,0.0001716971,0.0005096454,0.00049826095,0.0001632232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045479573,0.0009383775,0.0011149293,0.003356958,0.0014914648,0.0050135134,0.0038323416,0.0024413574,0.019432109],"category_scores_gemma":[0.010844902,0.0006252844,0.001259801,0.0023340709,0.0009321029,0.0044755763,0.0027316266,0.0016858893,0.006077545],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040795963,0.00058414583,0.0017675689,0.0007966252,0.00023060184,0.0026197748,0.0011768732,0.0768634,0.0065714032,0.33467954,0.101890974,0.47241113],"study_design_scores_gemma":[0.00032654277,0.000120389166,0.00078968686,0.00038866248,0.000199348,0.001590083,0.00027083172,0.5599776,0.005360421,0.17844464,0.25237992,0.00015189573],"about_ca_topic_score_codex":0.0047768224,"about_ca_topic_score_gemma":0.004127348,"teacher_disagreement_score":0.019432109,"about_ca_system_score_codex":0.0017767595,"about_ca_system_score_gemma":0.0022089572,"threshold_uncertainty_score":0.06500685},"labels":[],"label_agreement":null},{"id":"W2335770678","doi":"10.3166/jesa.47.339-360","title":"Outils d’aide à la décision pour le diagnostic des structures immergées","year":2013,"lang":"fr","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.01603326735907842,"score_gpt":0.23362450375112384,"score_spread":0.21759123639204542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335770678","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03773209,0.0011991055,0.93693954,0.00071802805,0.0007386743,0.00025535972,0.00041071465,0.0056665055,0.01634003],"genre_scores_gemma":[0.38713932,0.0014590687,0.58362925,0.00041736016,0.00027732406,0.0003410282,0.000765955,0.00082916016,0.025141528],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.994772,0.0015479148,0.00022576896,0.000575875,0.002578065,0.0003004005],"domain_scores_gemma":[0.9919369,0.0049994504,0.00017672748,0.00076924515,0.0018504576,0.0002671691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002625914,0.0025689688,0.0017714099,0.002083778,0.0011694155,0.005996756,0.0017979076,0.0029584793,0.02715595],"category_scores_gemma":[0.008833207,0.0011829884,0.0014562121,0.0007184059,0.0015725273,0.003026078,0.0020463704,0.0023073864,0.0062623248],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030563707,0.0007787389,0.004625601,0.0019098846,0.00022750597,0.0019854358,0.0014585822,0.0666214,0.19429412,0.027285753,0.018362086,0.6793944],"study_design_scores_gemma":[0.000360708,0.0008411208,0.0063142623,0.00085541746,0.00024307819,0.0030187976,0.0011951516,0.64027774,0.24221973,0.018397229,0.08591727,0.00035946368],"about_ca_topic_score_codex":0.005640133,"about_ca_topic_score_gemma":0.005057308,"teacher_disagreement_score":0.02715595,"about_ca_system_score_codex":0.00090662064,"about_ca_system_score_gemma":0.0016188502,"threshold_uncertainty_score":0.09084576},"labels":[],"label_agreement":null},{"id":"W2335773252","doi":"10.1061/40671(2003)98","title":"Construction Methods Feasibility Reasoning in an Integrated Environment","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Pace; Reuse; Exploit; Modular design; Computer science; Process (computing); Schedule; Architecture; Product (mathematics); Systems engineering; Engineering management; Knowledge management; Engineering","score_opus":0.019172855103187333,"score_gpt":0.2738537474135827,"score_spread":0.25468089231039537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335773252","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016741342,0.00015277065,0.9939575,0.0002427955,0.000016931881,0.0000816228,0.00012369479,0.0006898573,0.0030607006],"genre_scores_gemma":[0.040580254,0.00026497105,0.95592487,0.000094612136,0.000048705915,0.00028681036,0.000603822,0.0001913857,0.0020044781],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9825386,0.007745454,0.0020996851,0.0025674456,0.004343102,0.0007058029],"domain_scores_gemma":[0.98164153,0.013320283,0.0008021189,0.0025375504,0.0014235998,0.00027496333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016656883,0.0015259753,0.0014451322,0.005775053,0.0019940443,0.009330062,0.005333726,0.0032566402,0.011211792],"category_scores_gemma":[0.029238967,0.002933377,0.00512661,0.005534446,0.0052613365,0.014092968,0.010212639,0.003804261,0.0019806176],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009145312,0.00015590338,0.0010299275,0.0005253176,0.00026324295,0.00077006733,0.0014072399,0.08913499,0.0015971876,0.80664945,0.0040736697,0.09430158],"study_design_scores_gemma":[0.00010313083,0.00004285019,0.00023014638,0.00016806762,0.00017174093,0.0002355345,0.0002875472,0.22455157,0.0023279355,0.72893566,0.0428942,0.000051656745],"about_ca_topic_score_codex":0.008846594,"about_ca_topic_score_gemma":0.010532341,"teacher_disagreement_score":0.016656883,"about_ca_system_score_codex":0.00223476,"about_ca_system_score_gemma":0.0030142155,"threshold_uncertainty_score":0.088091135},"labels":[],"label_agreement":null},{"id":"W2335854605","doi":"","title":"OTTAWA DECISION SUPPORT TUTORIAL FOR ENHANCING UNDERSTANDING OF SHARED DECISION MAKING: WHAT DO THE USERS THINK?","year":2015,"lang":"en","type":"article","venue":"37th Annual Meeting of the Society for Medical Decision Making","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Decision support system; R-CAST; Computer science; Business decision mapping; Decision analysis; Decision aids; Knowledge management; Management science; Data science; Artificial intelligence; Engineering; Medicine; Mathematics","score_opus":0.025929664096791916,"score_gpt":0.29610330021762626,"score_spread":0.27017363612083434,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2335854605","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007174523,0.012628503,0.36471447,0.0850837,0.008988739,0.0018174694,0.021674432,0.024174094,0.473744],"genre_scores_gemma":[0.049812905,0.011041526,0.4511601,0.00590944,0.0006576852,0.0022957704,0.011300959,0.00329434,0.46452728],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.99765825,0.0007300195,0.00027033815,0.00016310561,0.00097285217,0.00020541328],"domain_scores_gemma":[0.9889292,0.0043424973,0.00022035676,0.00046275972,0.004939913,0.0011052073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040520686,0.0015010908,0.000922163,0.0020593393,0.002453286,0.0044866847,0.0026738935,0.0024292562,0.14798805],"category_scores_gemma":[0.013902765,0.0011560841,0.0012338914,0.0021760934,0.001607896,0.003923388,0.0028557016,0.003273961,0.039759364],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001335723,0.000115210685,0.00035308333,0.00039618686,0.00002212566,0.00016356118,0.0008432064,0.0013342341,0.0006393142,0.017351542,0.81663436,0.16201344],"study_design_scores_gemma":[0.000058396345,0.000025811163,0.00054476276,0.00039607188,0.00002735403,0.00009683521,0.00055882795,0.0019962192,0.0007305794,0.012639604,0.982844,0.00008153153],"about_ca_topic_score_codex":0.21739954,"about_ca_topic_score_gemma":0.502737,"teacher_disagreement_score":0.21739954,"about_ca_system_score_codex":0.009445805,"about_ca_system_score_gemma":0.029862108,"threshold_uncertainty_score":0.49506932},"labels":[],"label_agreement":null},{"id":"W2337285428","doi":"","title":"Adoption of a Management System Approach to Geometric Design Process for Better and Safer Roads","year":2015,"lang":"en","type":"article","venue":"TAC 2015: Getting You There Safely - 2015 Conference and Exhibition of the Transportation Association of Canada // ATC: Destination sÃ©curitÃ© routiÃ¨re - 2015 CongrÃ¨s et Exposition de l'Association des transports du Canada","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"SAFER; Geometric design; Transport engineering; Process (computing); Asset (computer security); Engineering; Construction engineering; Systems engineering; Computer science; Risk analysis (engineering); Computer security; Business","score_opus":0.013138104471593987,"score_gpt":0.2127801697716791,"score_spread":0.1996420653000851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2337285428","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004862996,0.00030410624,0.9371624,0.0028144028,0.00020551698,0.00042350384,0.00007525342,0.0010115147,0.05314031],"genre_scores_gemma":[0.05711151,0.0005566793,0.92145455,0.00047327188,0.00008961757,0.00040615856,0.00024927076,0.00041051008,0.019248454],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9883279,0.004104956,0.0007866245,0.0015309476,0.004811693,0.00043789388],"domain_scores_gemma":[0.99099344,0.00145314,0.0007589804,0.0016926173,0.004641743,0.00045992804],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011256745,0.0012486998,0.0006156256,0.0040011653,0.0030022955,0.011767436,0.0033720583,0.0021533996,0.011706948],"category_scores_gemma":[0.009540866,0.0010898095,0.0012568622,0.0037036953,0.0049264524,0.006448255,0.005330117,0.0041810167,0.0036853675],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032920303,0.00028423104,0.0026129037,0.0006577641,0.000064670756,0.00020447923,0.006822706,0.03557301,0.007064792,0.6456755,0.015842492,0.2851645],"study_design_scores_gemma":[0.000045393597,0.00029098388,0.0028770668,0.00066386216,0.00006686288,0.0004935967,0.003440495,0.08058693,0.0074007856,0.14994542,0.7540674,0.000121140474],"about_ca_topic_score_codex":0.0109194275,"about_ca_topic_score_gemma":0.017045213,"teacher_disagreement_score":0.011767436,"about_ca_system_score_codex":0.0083004255,"about_ca_system_score_gemma":0.014840904,"threshold_uncertainty_score":0.060224056},"labels":[],"label_agreement":null},{"id":"W2339012944","doi":"10.60164/b1e4b3f8i","title":"Generic Implementation of Lean Concepts in Simulation Models","year":2004,"lang":"en","type":"article","venue":"Lean Construction Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Standards Association","funders":"","keywords":"Lean manufacturing; Lean project management; Lean construction; Process (computing); Production (economics); Computer science; Lean laboratory; Manufacturing engineering; Lean software development; Product (mathematics); Industrial engineering; Process management; Systems engineering; Engineering; Construction industry; Construction engineering; Software","score_opus":0.0176654575413583,"score_gpt":0.2755998956761529,"score_spread":0.2579344381347946,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2339012944","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037439014,0.000070119066,0.9907348,0.00007662889,0.00001892369,0.00010789198,0.00008806332,0.0008587477,0.004300946],"genre_scores_gemma":[0.12826505,0.0005996669,0.86755645,0.00006438491,0.000024984094,0.00056501146,0.0003738164,0.00036402364,0.002186602],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99800974,0.0007652775,0.00025634782,0.00018710681,0.00065757224,0.0001239967],"domain_scores_gemma":[0.99830127,0.0007077755,0.00011903391,0.000553505,0.00026564248,0.000052791413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031991333,0.0011546348,0.00092444813,0.0010945168,0.0005217012,0.0021787903,0.0022302712,0.0013049012,0.0035149173],"category_scores_gemma":[0.004910641,0.0008522284,0.0019191817,0.0011422798,0.0015250746,0.0019860005,0.002126285,0.0017441672,0.00085194584],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004350818,0.000074938456,0.00070617883,0.00027680388,0.00008018505,0.00016932604,0.00041248932,0.51375294,0.00436631,0.44914034,0.0007933602,0.030183632],"study_design_scores_gemma":[0.000042095573,0.00006266829,0.00013928757,0.0001276737,0.00005312323,0.00008693563,0.000057438647,0.8504044,0.0074133975,0.11134734,0.030233854,0.000031918695],"about_ca_topic_score_codex":0.0014276154,"about_ca_topic_score_gemma":0.001706763,"teacher_disagreement_score":0.0035149173,"about_ca_system_score_codex":0.001183304,"about_ca_system_score_gemma":0.00131968,"threshold_uncertainty_score":0.016918838},"labels":[],"label_agreement":null},{"id":"W2340495110","doi":"","title":"Development of the Detectable Warning Surface Tiles Standard Specification for the City of Winnipeg","year":2015,"lang":"en","type":"article","venue":"TAC 2015: Getting You There Safely - 2015 Conference and Exhibition of the Transportation Association of Canada // ATC: Destination sÃ©curitÃ© routiÃ¨re - 2015 CongrÃ¨s et Exposition de l'Association des transports du Canada","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rationalization (economics); SAFER; Engineering; National standard; Architectural engineering; Computer security; Computer science; Political science","score_opus":0.013456146656362128,"score_gpt":0.21413614644970558,"score_spread":0.20067999979334344,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2340495110","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17683393,0.0019808568,0.4403607,0.006411589,0.0010596378,0.011172847,0.020143002,0.0031029219,0.3389345],"genre_scores_gemma":[0.2850996,0.0019518182,0.56563365,0.0011463718,0.000053105246,0.0041708755,0.018718582,0.001297944,0.12192804],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99210405,0.000804372,0.00061738014,0.00050928374,0.005190824,0.0007741489],"domain_scores_gemma":[0.99034005,0.0003744096,0.00031673955,0.00043012618,0.008108826,0.00042982068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004941323,0.0009341999,0.00050778536,0.0032070484,0.002208641,0.0039381334,0.0027292273,0.0009916311,0.004704015],"category_scores_gemma":[0.009043266,0.001136387,0.0006740896,0.0018909007,0.0012623179,0.0012511207,0.002327984,0.0012144829,0.0021418037],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006255781,0.0004282085,0.04592081,0.0017882282,0.000073756746,0.002977207,0.011891304,0.053137165,0.065179646,0.23125376,0.1764606,0.4102638],"study_design_scores_gemma":[0.000049262675,0.00012600196,0.03246258,0.0005649491,0.00004683155,0.00047283803,0.0038877958,0.010795481,0.015064806,0.0035142344,0.9328555,0.00015964516],"about_ca_topic_score_codex":0.78304225,"about_ca_topic_score_gemma":0.8569347,"teacher_disagreement_score":0.21695775,"about_ca_system_score_codex":0.021643415,"about_ca_system_score_gemma":0.043358974,"threshold_uncertainty_score":0.43647087},"labels":[],"label_agreement":null},{"id":"W2341522343","doi":"10.14288/1.0062461","title":"Enhancing the performance and productivity of the New Brunswick construction industry through appropriate digital technology adoption : final report","year":2014,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Business; Industry 4.0; Industrial organization; Marketing; Engineering management; Operations management; Computer science; Engineering; Economics; Economic growth","score_opus":0.0049680621440849415,"score_gpt":0.1507651603075884,"score_spread":0.14579709816350347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2341522343","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95510274,0.0008130815,0.0018983607,0.002557905,0.000060613398,0.0020655137,0.0024973026,0.00011845117,0.03488599],"genre_scores_gemma":[0.9585398,0.002459558,0.007966583,0.0004266297,0.000028299595,0.001005238,0.0037383137,0.000056917816,0.025778653],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99555343,0.0006590662,0.00024507253,0.00023199417,0.0023846542,0.0009257571],"domain_scores_gemma":[0.9911083,0.0008273641,0.00058970356,0.0005130755,0.0062892325,0.0006723716],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042894725,0.00053103163,0.0002617063,0.001352684,0.0015765347,0.0024347594,0.000965193,0.00042626922,0.0024734512],"category_scores_gemma":[0.0057749627,0.0002492102,0.00028742405,0.0024134654,0.00073335617,0.00088878337,0.0016222439,0.0006902997,0.0006379617],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010031802,0.0035110263,0.4541267,0.0015618152,0.00016879431,0.001915422,0.022786431,0.0072525567,0.04650814,0.0029724296,0.021317132,0.4368764],"study_design_scores_gemma":[0.00015322096,0.0016756265,0.82716227,0.0003108905,0.000110942055,0.00017613254,0.03828763,0.0014052967,0.043371167,0.0003232062,0.0869,0.00012361853],"about_ca_topic_score_codex":0.66401947,"about_ca_topic_score_gemma":0.8113957,"teacher_disagreement_score":0.9799041,"about_ca_system_score_codex":0.020095877,"about_ca_system_score_gemma":0.053672533,"threshold_uncertainty_score":0.67591834},"labels":[],"label_agreement":null},{"id":"W2344774270","doi":"10.14288/1.0098891","title":"Adopting computers in architectural firms","year":2008,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Business; Software engineering; Programming language","score_opus":0.006487521682712006,"score_gpt":0.1434317194288764,"score_spread":0.1369441977461644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2344774270","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9915324,0.00045000712,0.00016025847,0.0005932678,0.00000517039,0.000015705862,0.000009128757,0.000006027977,0.007228077],"genre_scores_gemma":[0.99758685,0.00038742987,0.00013351093,0.000079281606,0.0000038299436,0.0000046774835,0.000014516814,0.0000019954728,0.0017878352],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9954346,0.0017987407,0.00015404097,0.0003208488,0.0009149044,0.0013768787],"domain_scores_gemma":[0.986509,0.0051848562,0.0030354878,0.00054850156,0.0019614329,0.0027606587],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023406001,0.00018593088,0.0001913242,0.002166631,0.005238302,0.006749697,0.00078124955,0.0011242293,0.0041514332],"category_scores_gemma":[0.009554082,0.00033962962,0.000164877,0.0054778643,0.0035333284,0.0019545038,0.00293208,0.0010536029,0.0003564923],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021040722,0.00045538897,0.6064909,0.00030672515,0.000029917603,0.0032797952,0.23528422,0.0009383812,0.0036245766,0.018993631,0.0025369865,0.1278491],"study_design_scores_gemma":[0.000022575408,0.0004465319,0.4366412,0.00020393422,0.000027722608,0.0009142209,0.49636292,0.0008889553,0.0010943084,0.0017553701,0.061576232,0.0000661375],"about_ca_topic_score_codex":0.061663378,"about_ca_topic_score_gemma":0.13233368,"teacher_disagreement_score":0.061663378,"about_ca_system_score_codex":0.0068295705,"about_ca_system_score_gemma":0.0057023186,"threshold_uncertainty_score":0.12260896},"labels":[],"label_agreement":null},{"id":"W2346222113","doi":"10.7492/ijaec.2016.003","title":"Modeling Infrastructure Bridges Maintenance Work Zones","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Construction engineering; Bridge (graph theory); Computer science; Geology; Business; Engineering; Mechanical engineering","score_opus":0.002788475860728361,"score_gpt":0.17281133658599027,"score_spread":0.1700228607252619,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2346222113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7543875,0.00034418664,0.20607364,0.00037902186,0.000069502916,0.00011121066,0.0009075291,0.0004710422,0.03725634],"genre_scores_gemma":[0.9816658,0.00010937358,0.012040295,0.000013485171,0.0000092279515,0.000047581743,0.0003002307,0.000055736546,0.0057582264],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984205,0.000042194486,0.000007821275,0.000035483576,0.00002527321,0.000047067224],"domain_scores_gemma":[0.999605,0.00022662581,0.00004593135,0.000028802402,0.00006324602,0.000030387417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034192862,0.00052340137,0.0005177833,0.00078973843,0.0005850716,0.0015995617,0.0016177924,0.0015907162,0.006722741],"category_scores_gemma":[0.0011228658,0.00080123526,0.0008735961,0.0008655088,0.0005896296,0.0010415765,0.0006615165,0.00053557986,0.00049075374],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012576077,0.000023349297,0.0007130893,0.000008104577,0.000006528989,0.000024115036,0.000023733446,0.99415225,0.00018737558,0.0031728437,0.00009822016,0.001577808],"study_design_scores_gemma":[0.0000041096205,0.0000051275892,0.00020548819,0.000002202427,0.000004610403,0.0000037133598,0.000029267505,0.99867046,0.0000711709,0.00069149653,0.00031019302,0.0000020397756],"about_ca_topic_score_codex":0.08178256,"about_ca_topic_score_gemma":0.052394923,"teacher_disagreement_score":0.08178256,"about_ca_system_score_codex":0.0015600749,"about_ca_system_score_gemma":0.0015255916,"threshold_uncertainty_score":0.16261303},"labels":[],"label_agreement":null},{"id":"W2351475691","doi":"","title":"Probe into the Problems Existing in Current Intellectualized Construction of Residential Quarter and the Countermeasures","year":2008,"lang":"en","type":"article","venue":"Sci-Tech Information Development & Economy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Current (fluid); Engineering; Architectural engineering; Risk analysis (engineering); Electrical engineering; Business; Geography","score_opus":0.014862588401724146,"score_gpt":0.20398595965566038,"score_spread":0.18912337125393625,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2351475691","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29082352,0.006924322,0.26341522,0.040243827,0.0010006079,0.00026164472,0.0001664875,0.001441082,0.39572322],"genre_scores_gemma":[0.941884,0.00215082,0.035581205,0.0009302454,0.00015297266,0.00007503346,0.00009219412,0.000094514646,0.019039137],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99625266,0.00095256063,0.00018756207,0.0003180695,0.0019564854,0.00033262616],"domain_scores_gemma":[0.9966672,0.0006486299,0.0005384782,0.0008041204,0.0011151092,0.00022650215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025873873,0.0003878858,0.00027102022,0.0018729683,0.0023458784,0.004833833,0.001329572,0.0011459286,0.006188924],"category_scores_gemma":[0.0047784727,0.00025307093,0.00028973015,0.0015426978,0.005804133,0.007218066,0.003300293,0.0018332134,0.00072325673],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008598782,0.000076868666,0.012062938,0.00037445885,0.000024055616,0.0005153864,0.0056606964,0.005671679,0.0029862963,0.7771369,0.008752575,0.18665217],"study_design_scores_gemma":[0.000047581234,0.0003149972,0.022440381,0.00073989865,0.00007711906,0.002787753,0.025546735,0.0257208,0.014903151,0.44828802,0.45895445,0.000179173],"about_ca_topic_score_codex":0.002802832,"about_ca_topic_score_gemma":0.0036126648,"teacher_disagreement_score":0.006188924,"about_ca_system_score_codex":0.0036312893,"about_ca_system_score_gemma":0.0035248818,"threshold_uncertainty_score":0.026346982},"labels":[],"label_agreement":null},{"id":"W23564366","doi":"10.22260/isarc2013/0037","title":"Conflict Impact Assessment between Objects in a BIM System","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Seriousness; Computer science; Building information modeling; Conflict analysis; Operations research; Engineering; Operations management; Conflict resolution; Sociology; Political science","score_opus":0.009546662019823189,"score_gpt":0.23058896385580382,"score_spread":0.22104230183598064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W23564366","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20641208,0.0006320056,0.77104753,0.00028644662,0.00009111858,0.0011168219,0.0008587602,0.0023261833,0.017229104],"genre_scores_gemma":[0.66788906,0.00032345438,0.32861874,0.00006393531,0.000025431129,0.00036943032,0.0010768326,0.000104776474,0.0015282414],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.987789,0.0037544295,0.0010467407,0.00085873506,0.006014023,0.0005371898],"domain_scores_gemma":[0.99484164,0.0022320568,0.00069768046,0.00048186388,0.0014286867,0.0003180221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005624435,0.0013371998,0.0010893325,0.007896496,0.0011066082,0.0047289683,0.0016214054,0.00095611846,0.0028353094],"category_scores_gemma":[0.011900413,0.00074649585,0.0010171734,0.0048151263,0.0009429852,0.0042772195,0.0043150135,0.0007697311,0.0008141758],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016171864,0.0008928724,0.07074201,0.0015605689,0.0006381902,0.0018733579,0.0059421887,0.23779766,0.02798943,0.03252112,0.006316324,0.61210907],"study_design_scores_gemma":[0.00006342702,0.0004112723,0.019192029,0.0002609727,0.00032436204,0.000550116,0.0028251659,0.9224918,0.022946445,0.016588619,0.014152387,0.00019337959],"about_ca_topic_score_codex":0.0034118432,"about_ca_topic_score_gemma":0.0026021493,"teacher_disagreement_score":0.007896496,"about_ca_system_score_codex":0.0013424539,"about_ca_system_score_gemma":0.0016772026,"threshold_uncertainty_score":0.029745162},"labels":[],"label_agreement":null},{"id":"W2369018680","doi":"","title":"Taking Huatai residential quarter in Handan as example to discuss energy-efficiency design of residential buildings","year":2007,"lang":"en","type":"article","venue":"Shanxi Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Energy consumption; Architectural engineering; Compatibility (geochemistry); Efficient energy use; Engineering; Environmental science; Civil engineering; Geography","score_opus":0.009214995333350733,"score_gpt":0.22941619825519577,"score_spread":0.22020120292184503,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2369018680","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16204476,0.0080859335,0.08434567,0.0030157608,0.0010994315,0.00025918154,0.0003127746,0.00036344098,0.7404731],"genre_scores_gemma":[0.60781175,0.006971237,0.074056506,0.0009472088,0.00017140755,0.00019577578,0.0003573602,0.0000976269,0.3093911],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9999478,0.000014356922,0.0000026958703,0.0000064404744,0.00001633452,0.000012371862],"domain_scores_gemma":[0.99998295,0.0000030647393,0.0000026751457,0.0000014635988,0.000006532713,0.000003397907],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00007318927,0.0003862644,0.00019358825,0.00053509156,0.00106318,0.00058844354,0.00025634203,0.00036601108,0.007884249],"category_scores_gemma":[0.00005273981,0.00015866193,0.00019234116,0.00087001425,0.00034944457,0.0003306851,0.00049552246,0.0003652991,0.0010836786],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019828486,0.00028680632,0.015538429,0.00085394096,0.00002011232,0.00950028,0.007570338,0.04336572,0.03423109,0.46881604,0.062599815,0.35701922],"study_design_scores_gemma":[0.000010229668,0.00024014768,0.031959362,0.00015766283,0.000018930357,0.0028756831,0.0051740315,0.020927675,0.0064922925,0.026030265,0.9060519,0.00006196563],"about_ca_topic_score_codex":0.012584937,"about_ca_topic_score_gemma":0.04707883,"teacher_disagreement_score":0.012584937,"about_ca_system_score_codex":0.0010605878,"about_ca_system_score_gemma":0.0004923752,"threshold_uncertainty_score":0.026375413},"labels":[],"label_agreement":null},{"id":"W2376967410","doi":"","title":"Design Idea of a Intelligent Residential Quarter","year":2002,"lang":"en","type":"article","venue":"Jiangsu Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architectural engineering; Engineering; Civil engineering; Geography; Archaeology","score_opus":0.01555799708740064,"score_gpt":0.19764651726436266,"score_spread":0.18208852017696203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2376967410","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07602182,0.00016226442,0.8040445,0.0007978332,0.0001833414,0.00015549421,0.00014993674,0.0012075212,0.11727734],"genre_scores_gemma":[0.75466686,0.00013207528,0.20186813,0.00012770374,0.000036889433,0.0001411749,0.00011241681,0.00010483066,0.042809933],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997286,0.000063588195,0.000011221852,0.00007163978,0.00008566622,0.000039297385],"domain_scores_gemma":[0.99992454,0.000006029136,0.0000057259094,0.00001834104,0.000029247527,0.000016104399],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002771351,0.00040244876,0.00038135608,0.0005252283,0.0013954963,0.0014482733,0.0008463225,0.00080443383,0.007235339],"category_scores_gemma":[0.00025380237,0.00031373365,0.00050259463,0.0005850716,0.0008985877,0.0011248769,0.0011729242,0.0003743473,0.0010048456],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045440998,0.0001500065,0.004557395,0.0002517434,0.000043436063,0.0012165966,0.0033801922,0.13078392,0.044607103,0.6562024,0.0101665035,0.14818637],"study_design_scores_gemma":[0.00013546094,0.0005937351,0.0035924914,0.000061861116,0.00013273212,0.0013280481,0.003058787,0.6559905,0.018243179,0.14178255,0.17495939,0.000121313795],"about_ca_topic_score_codex":0.002805991,"about_ca_topic_score_gemma":0.0024531307,"teacher_disagreement_score":0.007235339,"about_ca_system_score_codex":0.0007698041,"about_ca_system_score_gemma":0.0008506933,"threshold_uncertainty_score":0.024204671},"labels":[],"label_agreement":null},{"id":"W2380825133","doi":"","title":"Research on Intelligent Residential Quarter Facility Management","year":2005,"lang":"en","type":"article","venue":"Journal of Jilin Architectural and Civil Engineering Institute","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facility management; Quarter (Canadian coin); Building automation; Process (computing); Engineering management; Architectural engineering; Building management; Management system; Point (geometry); Engineering; Operations management; Business; Computer science; Marketing; Geography","score_opus":0.018551809593358986,"score_gpt":0.2551523108305689,"score_spread":0.2366005012372099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2380825133","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12484945,0.016464604,0.53931123,0.008946128,0.00034411802,0.0001268031,0.00014455648,0.00082011096,0.30899307],"genre_scores_gemma":[0.87879866,0.0078942245,0.08767266,0.00050006644,0.0001980622,0.00006732265,0.00015678772,0.000069247384,0.024642814],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987596,0.00032349068,0.00006913277,0.00022435257,0.00043578318,0.00018758197],"domain_scores_gemma":[0.9986412,0.00041869978,0.00023462549,0.00021377222,0.00039948686,0.000092181785],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012247441,0.00025971726,0.00027723316,0.0008930196,0.0008259837,0.002857992,0.0014465118,0.0010645422,0.0057803974],"category_scores_gemma":[0.002047977,0.00021626014,0.00031100283,0.002147325,0.001696358,0.0060901195,0.001024998,0.00070994504,0.00073772314],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007092617,0.00010753283,0.0034925237,0.0003591319,0.000025967018,0.00014110666,0.001905845,0.026279552,0.0019360664,0.61952007,0.005957888,0.34020334],"study_design_scores_gemma":[0.000034814315,0.0002784885,0.008592689,0.00042690308,0.000053390835,0.00073037436,0.006058326,0.11382313,0.008885478,0.2327363,0.6282849,0.00009522993],"about_ca_topic_score_codex":0.0039319005,"about_ca_topic_score_gemma":0.0025207503,"teacher_disagreement_score":0.0057803974,"about_ca_system_score_codex":0.0028002372,"about_ca_system_score_gemma":0.0014271635,"threshold_uncertainty_score":0.020317256},"labels":[],"label_agreement":null},{"id":"W2381975180","doi":"","title":"Combined Thermal Storage Construction of Concrete Used in A9 Housing Project of Beijing Fulicheng Residential Quarter","year":2004,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Beijing; Quarter (Canadian coin); Plan (archaeology); Civil engineering; Architectural engineering; Engineering; Transport engineering; China; Geography","score_opus":0.008746843033676906,"score_gpt":0.2111575432327838,"score_spread":0.2024107001991069,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2381975180","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98390096,0.000056349243,0.007306248,0.00004256276,0.000009462997,0.00006597563,0.00012395682,0.00008820773,0.008406192],"genre_scores_gemma":[0.9862037,0.000046514146,0.009391592,0.0000030117849,0.0000015726831,0.00002312809,0.00009499261,0.000011226191,0.0042243386],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997173,0.000046450386,0.000018310535,0.000042684584,0.0001255483,0.000049691807],"domain_scores_gemma":[0.99989104,0.000006047892,0.0000135042565,0.00003348758,0.000031290692,0.00002462151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002893004,0.0002655595,0.00017339693,0.0006127447,0.0009499635,0.00035115445,0.00031361944,0.0002344785,0.0023079496],"category_scores_gemma":[0.00021669277,0.00020047779,0.0002774333,0.00074191514,0.00033590736,0.00035313296,0.0007002775,0.00019369202,0.00032057078],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011820485,0.00053662364,0.14882019,0.000495739,0.000073557516,0.0055372207,0.004923084,0.08660064,0.38614732,0.01820922,0.0028344134,0.34463993],"study_design_scores_gemma":[0.00023014484,0.0036274989,0.43060064,0.00012313224,0.00024890262,0.005923941,0.008659346,0.10032796,0.3613612,0.0057571097,0.08296049,0.00017964377],"about_ca_topic_score_codex":0.00779394,"about_ca_topic_score_gemma":0.023782214,"teacher_disagreement_score":0.00779394,"about_ca_system_score_codex":0.0006970958,"about_ca_system_score_gemma":0.0016505254,"threshold_uncertainty_score":0.015497148},"labels":[],"label_agreement":null},{"id":"W2385982178","doi":"","title":"Study on the Problems in and Countermeasures for the Protection of Earthen Building in Fujian Province","year":2013,"lang":"en","type":"article","venue":"Sci-Tech Information Development & Economy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Popularity; Tourism; Reputation; Business; Environmental planning; Geography; Engineering; Civil engineering; Political science; Archaeology; Law","score_opus":0.01766171698253818,"score_gpt":0.19116201071893615,"score_spread":0.17350029373639797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2385982178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9886777,0.0008860737,0.0010962364,0.0009880629,0.000014179835,0.000053028052,0.000029935089,0.000008558228,0.008246255],"genre_scores_gemma":[0.9966271,0.00058000383,0.00069619215,0.000032723714,0.0000034837453,0.000007237064,0.000028329145,0.0000015143403,0.0020234676],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992455,0.00014275998,0.0000420304,0.00007214901,0.00030152046,0.00019600896],"domain_scores_gemma":[0.9993637,0.00012376676,0.00014852251,0.000026054693,0.00026283384,0.000075066826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010877433,0.00032783923,0.00016950237,0.0013909275,0.0018884544,0.00095061184,0.00064766576,0.0005464793,0.0012997072],"category_scores_gemma":[0.0013441375,0.00020846447,0.00022968819,0.0014288232,0.00073370355,0.0010954958,0.0005512168,0.00038975268,0.00005519302],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002057826,0.000342284,0.67878234,0.001030937,0.00011112918,0.0053367275,0.0465086,0.01114841,0.011451365,0.018833745,0.0052747107,0.22097397],"study_design_scores_gemma":[0.000011859098,0.0001944532,0.84143955,0.00028850028,0.00014033681,0.0007216856,0.1126718,0.00911141,0.0042915046,0.0016374266,0.029443625,0.000047847072],"about_ca_topic_score_codex":0.15402986,"about_ca_topic_score_gemma":0.25087014,"teacher_disagreement_score":0.15402986,"about_ca_system_score_codex":0.0039183395,"about_ca_system_score_gemma":0.0058181966,"threshold_uncertainty_score":0.3062666},"labels":[],"label_agreement":null},{"id":"W2387807980","doi":"","title":"Mensuration of Thermal Conductivity Coefficient and Linear Thermal Expansion Coefficient of Shale CeramicsGrain Concrete Products","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Thermal conductivity; Thermal expansion; Oil shale; Materials science; Roof; Ceramic; Thermal; Composite material; Mineralogy; Structural engineering; Geology; Thermodynamics; Engineering; Waste management; Physics","score_opus":0.011335647690349669,"score_gpt":0.21271711780021285,"score_spread":0.20138147010986318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2387807980","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.995116,0.00022853189,0.002472761,0.000015397089,0.0000066634534,0.0000058181117,0.00018646609,0.000054880198,0.0019134559],"genre_scores_gemma":[0.99769956,0.0000722342,0.0007992312,0.000005862037,0.0000015054153,0.0000058158753,0.00012823926,0.000012817428,0.0012747304],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995047,0.00007421398,0.0000300884,0.00010957327,0.00021471028,0.00006668875],"domain_scores_gemma":[0.99895203,0.00034150516,0.00023073725,0.00013149343,0.0002880384,0.00005612415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046026925,0.00036174554,0.00017193166,0.0005276187,0.00016699843,0.0002118298,0.00028355364,0.00031794014,0.002241748],"category_scores_gemma":[0.0010490128,0.00022875583,0.00022455699,0.00055439776,0.00036915828,0.00058131595,0.000218736,0.00036090592,0.00041012125],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055467954,0.00006510736,0.009406541,0.00007981548,0.000028430577,0.00012735504,0.00051877176,0.003841135,0.9698472,0.000582843,0.00022732676,0.014720783],"study_design_scores_gemma":[0.0000048237107,0.00030426303,0.020221904,0.0000073273663,0.000020565634,0.00007924136,0.0001506622,0.0044982303,0.97378254,0.00006569014,0.0008428107,0.000021874037],"about_ca_topic_score_codex":0.0012052062,"about_ca_topic_score_gemma":0.00195846,"teacher_disagreement_score":0.002241748,"about_ca_system_score_codex":0.00024927792,"about_ca_system_score_gemma":0.00016753608,"threshold_uncertainty_score":0.0074994564},"labels":[],"label_agreement":null},{"id":"W2392852446","doi":"","title":"Research on Energy-saving Retrofit Method of Existed Buildings Based on Actual Conditions","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"CAE (Canada)","funders":"","keywords":"Payback period; Energy (signal processing); Energy consumption; Architectural engineering; Foundation (evidence); Process (computing); Engineering; Consumption (sociology); Civil engineering; Computer science; Production (economics); Economics; Mathematics","score_opus":0.04044882490353085,"score_gpt":0.34215741989326265,"score_spread":0.3017085949897318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2392852446","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19291201,0.00063827424,0.78464437,0.00015132867,0.00007330894,0.00020173182,0.000096760334,0.0006704784,0.020611838],"genre_scores_gemma":[0.8386972,0.0008296935,0.1559308,0.000018361774,0.000024636493,0.00008490188,0.00010708455,0.00006293123,0.004244509],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99893266,0.00029402482,0.00005210035,0.00017359878,0.00050046894,0.000047095684],"domain_scores_gemma":[0.99905926,0.00030842464,0.00007565007,0.00018281852,0.00033621208,0.000037717524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012041877,0.00043442985,0.00036408973,0.0016506959,0.00032836632,0.0010128894,0.000779352,0.0003424702,0.0048319404],"category_scores_gemma":[0.003524053,0.00038509668,0.00046122278,0.0011054677,0.0007716502,0.0032396442,0.00051067903,0.00040073748,0.00039409858],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046593594,0.0003024839,0.011065852,0.0007074837,0.00008094838,0.00016414675,0.0011263189,0.0573178,0.06725008,0.06476153,0.0011781121,0.7955794],"study_design_scores_gemma":[0.00013382587,0.0013422268,0.038773872,0.00021361423,0.00024643118,0.0015755049,0.0024120104,0.7111562,0.17877269,0.0331535,0.03193967,0.00028035502],"about_ca_topic_score_codex":0.001031029,"about_ca_topic_score_gemma":0.0015280342,"teacher_disagreement_score":0.0048319404,"about_ca_system_score_codex":0.0003896625,"about_ca_system_score_gemma":0.00044192222,"threshold_uncertainty_score":0.016164422},"labels":[],"label_agreement":null},{"id":"W2394706375","doi":"10.1016/j.proeng.2016.04.056","title":"Achieving Sustainable Structural Steel Design by Estimating Fabrication Labor Cost Based on BIM Data","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Cost estimate; Estimation; Engineering; Activity-based costing; Production (economics); Matching (statistics); Set (abstract data type); Operations research; Manufacturing engineering; Computer science; Business; Economics; Marketing; Systems engineering","score_opus":0.012469442899851187,"score_gpt":0.21569187876420826,"score_spread":0.20322243586435706,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2394706375","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6273522,0.0001924777,0.35514516,0.00016890114,0.000017663915,0.00028921355,0.0048939185,0.0007396245,0.01120087],"genre_scores_gemma":[0.76216906,0.00020265278,0.23076776,0.000012812141,0.0000069183916,0.00028697893,0.005331598,0.00007783436,0.0011443621],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985936,0.00040047523,0.00008512862,0.00018880072,0.00062976807,0.00010226391],"domain_scores_gemma":[0.99721885,0.0009179824,0.00049482635,0.0005157015,0.0007686719,0.00008400451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018681012,0.00085216836,0.00050593883,0.0041154507,0.00040087063,0.0010632479,0.0008028593,0.0006274266,0.0014463362],"category_scores_gemma":[0.0064810864,0.0005953486,0.0005632355,0.003995459,0.00030303694,0.0015042258,0.0008418037,0.00042199326,0.00088624266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011622816,0.00028833805,0.10888232,0.00020263747,0.00007220612,0.00018535694,0.0004443273,0.69525576,0.004456435,0.004727533,0.0021582376,0.18321072],"study_design_scores_gemma":[0.000009324202,0.00008509404,0.048859876,0.000045354365,0.000027612556,0.00006262747,0.00046129065,0.93837637,0.0042344336,0.0031166503,0.004686186,0.00003522161],"about_ca_topic_score_codex":0.011969716,"about_ca_topic_score_gemma":0.024446238,"teacher_disagreement_score":0.011969716,"about_ca_system_score_codex":0.0014243231,"about_ca_system_score_gemma":0.0016974283,"threshold_uncertainty_score":0.023800075},"labels":[],"label_agreement":null},{"id":"W2397323803","doi":"10.1177/0037549715608373","title":"Special issue on simulation related to design","year":2015,"lang":"en","type":"article","venue":"SIMULATION","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Computer science; Management science; Engineering","score_opus":0.030647872019218682,"score_gpt":0.2699014064517079,"score_spread":0.23925353443248923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2397323803","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006418732,0.03831892,0.006251453,0.023046548,0.83461493,0.00009572858,0.00035689867,0.0003958485,0.096277736],"genre_scores_gemma":[0.0053461934,0.035853576,0.0015269875,0.006853025,0.7985628,0.00012127859,0.00095845753,0.00064693234,0.15013061],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99716467,0.00056942157,0.0003085928,0.0004352724,0.0012707179,0.0002513315],"domain_scores_gemma":[0.9890323,0.0045821634,0.0006484317,0.0012812809,0.0027163262,0.001739501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032108356,0.0028168582,0.0034403396,0.0076806378,0.0024673631,0.006843496,0.0025679597,0.006199091,0.13141741],"category_scores_gemma":[0.009747066,0.0008412011,0.0022770392,0.0039028411,0.0019765086,0.005409211,0.004976099,0.005273349,0.036020476],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042239026,0.000077939396,0.00017231458,0.0005380229,0.00003083928,0.00013837972,0.00003903164,0.0004172448,0.0003079366,0.0075022816,0.9473595,0.043374185],"study_design_scores_gemma":[0.000008448077,0.000048967144,0.00037268497,0.00042703754,0.000018863453,0.0002553514,0.00003094218,0.0004981365,0.000116951225,0.0056520705,0.99255896,0.000011492835],"about_ca_topic_score_codex":0.0008111932,"about_ca_topic_score_gemma":0.0021253584,"teacher_disagreement_score":0.13141741,"about_ca_system_score_codex":0.0019489301,"about_ca_system_score_gemma":0.0026954713,"threshold_uncertainty_score":0.43963504},"labels":[],"label_agreement":null},{"id":"W2397726616","doi":"10.1061/9780784479827.004","title":"Design Change Time Ripple Effect Analysis Using a BIM-Based Quantification Model","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Scope (computer science); Computer science; Ripple; Risk analysis (engineering); Plan (archaeology); Work (physics); Project management; Frame (networking); Operations research; Systems engineering; Business; Engineering","score_opus":0.10438790563905705,"score_gpt":0.3354859888109263,"score_spread":0.23109808317186925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2397726616","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061167467,0.00019155172,0.91759884,0.00024746027,0.00003695911,0.00025474926,0.00056807534,0.0007529139,0.019182045],"genre_scores_gemma":[0.7853584,0.00040461976,0.20789732,0.000055327986,0.000013035414,0.0005680437,0.00060056965,0.00017169988,0.004931003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985794,0.00043608574,0.00008413154,0.00015857382,0.00062631123,0.00011548622],"domain_scores_gemma":[0.99782157,0.0011445562,0.00025940576,0.00019164337,0.00053532806,0.000047488516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028237968,0.00090191665,0.0005657257,0.0023601367,0.000560954,0.0017594126,0.001246828,0.00085603405,0.003015309],"category_scores_gemma":[0.004965302,0.0006231905,0.0011459799,0.0015744338,0.00062391435,0.0018174535,0.0011485837,0.00072829885,0.00032196284],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026695518,0.000031919466,0.0009016309,0.00005263193,0.000013558026,0.000041247342,0.00007568293,0.974147,0.00079928915,0.009473698,0.00035791108,0.014078784],"study_design_scores_gemma":[0.000004150156,0.000020248548,0.00049144414,0.000010597158,0.000016373584,0.000016707227,0.000036820686,0.9952306,0.000782281,0.002032275,0.001346234,0.000012258781],"about_ca_topic_score_codex":0.018640118,"about_ca_topic_score_gemma":0.01312486,"teacher_disagreement_score":0.018640118,"about_ca_system_score_codex":0.00266557,"about_ca_system_score_gemma":0.0026846232,"threshold_uncertainty_score":0.03706324},"labels":[],"label_agreement":null},{"id":"W2400396649","doi":"10.1061/9780784479827.250","title":"Random Generation of Complex Data Structures for the Simulation of Construction Operations","year":2016,"lang":"en","type":"article","venue":"Construction Research Congress 2016","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Randomness; Parametric statistics; Markov chain; Set (abstract data type); Process (computing); Pipeline (software); Data mining; Industrial engineering; Interdependence; Distributed computing; Engineering; Machine learning","score_opus":0.16323952456608698,"score_gpt":0.37708499350766844,"score_spread":0.21384546894158146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2400396649","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07710153,0.00008445843,0.92014784,0.00014740505,0.000039407387,0.00015656448,0.00031398825,0.0006796643,0.00132911],"genre_scores_gemma":[0.68762004,0.00016934858,0.31016973,0.000049795082,0.000018250339,0.00043180696,0.0006755515,0.00011802857,0.00074737985],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992428,0.00034223,0.000056184406,0.00009497041,0.00021233821,0.00005146555],"domain_scores_gemma":[0.995675,0.0029874989,0.00034304083,0.00055066077,0.0003484798,0.00009524982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001820657,0.000505477,0.00059574365,0.000872068,0.00038136513,0.00067331694,0.0010718942,0.0008090783,0.0017676583],"category_scores_gemma":[0.006820637,0.0004011369,0.00084413186,0.0009240276,0.00065485603,0.00095334277,0.0008059864,0.0009793208,0.0002379368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035326295,0.0000395784,0.00097122637,0.000026556587,0.000013797269,0.00002681042,0.00003634933,0.9852819,0.0009225994,0.006463493,0.00016704276,0.006015352],"study_design_scores_gemma":[0.0000044614876,0.000010230364,0.00009269414,0.0000020049831,0.0000015889941,0.000005870362,0.0000044997096,0.9981993,0.00048195926,0.0010167613,0.00017772926,0.0000029800858],"about_ca_topic_score_codex":0.0040261364,"about_ca_topic_score_gemma":0.0038491054,"teacher_disagreement_score":0.0040261364,"about_ca_system_score_codex":0.0008332042,"about_ca_system_score_gemma":0.0008756713,"threshold_uncertainty_score":0.0096286535},"labels":[],"label_agreement":null},{"id":"W2404039472","doi":"","title":"Bicircular Matroid Designs.","year":2013,"lang":"en","type":"article","venue":"Ars Combinatoria","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Matroid; Mathematics; Combinatorics","score_opus":0.008514013380461477,"score_gpt":0.19002088874504447,"score_spread":0.181506875364583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2404039472","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052754622,0.0011783015,0.6639845,0.00052551314,0.00032066982,0.00011818066,0.0010466157,0.00095147477,0.27912018],"genre_scores_gemma":[0.5517563,0.0010622172,0.33426917,0.0004687786,0.00013340263,0.00020534942,0.0018574531,0.00041141603,0.109835945],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99919766,0.00015299118,0.0000502019,0.00017405137,0.00033589185,0.000089227564],"domain_scores_gemma":[0.9994802,0.0000900249,0.00006881423,0.00014091782,0.00014982795,0.000070113],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000498243,0.00061593635,0.00048638726,0.0012697309,0.0008866607,0.0017298196,0.0009710662,0.0006184304,0.02173482],"category_scores_gemma":[0.0012441634,0.00040663802,0.0004838901,0.0011563122,0.0010204585,0.0018116677,0.002359241,0.0012792363,0.005213768],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005769439,0.000044320106,0.0003297027,0.00015757156,0.000022918011,0.00010457132,0.00014321967,0.004668444,0.00481381,0.8798906,0.008362762,0.1014043],"study_design_scores_gemma":[0.000033536104,0.0001250578,0.0008932456,0.00014446999,0.00005200756,0.00094711094,0.0004297887,0.027709221,0.009921274,0.7856242,0.17407793,0.000042177093],"about_ca_topic_score_codex":0.0009664595,"about_ca_topic_score_gemma":0.0025741044,"teacher_disagreement_score":0.02173482,"about_ca_system_score_codex":0.0007836138,"about_ca_system_score_gemma":0.00055118056,"threshold_uncertainty_score":0.072710276},"labels":[],"label_agreement":null},{"id":"W2406231571","doi":"10.1016/j.proeng.2016.04.166","title":"Analysis of Costs and Benefits of Panelized and Modular Prefabricated Homes","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":123,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Modular design; Engineering; Cost–benefit analysis; Quality (philosophy); Prefabrication; Cost analysis; Quantitative analysis (chemistry); Risk analysis (engineering); Transport engineering; Construction engineering; Work (physics); Architectural engineering; Operations management; Computer science; Operations research; Civil engineering; Business","score_opus":0.006088195311162842,"score_gpt":0.17547429097875775,"score_spread":0.1693860956675949,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2406231571","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9530234,0.00085176213,0.019587804,0.00025667116,0.000024266667,0.0003182053,0.000615348,0.000042160278,0.02528036],"genre_scores_gemma":[0.98479813,0.00032653837,0.0126365265,0.000010067043,0.0000072295798,0.00011238468,0.00020167814,0.000017162318,0.0018901909],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9966499,0.0011998783,0.00009104557,0.00014446094,0.001627433,0.00028727623],"domain_scores_gemma":[0.99417555,0.0037273136,0.0005036655,0.0003286116,0.0011150116,0.0001498328],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026491561,0.0006750858,0.000438301,0.0036326835,0.00055197073,0.0015039744,0.00073996355,0.0005473183,0.0046032052],"category_scores_gemma":[0.0080487095,0.00039669866,0.0008407339,0.0031798026,0.000583129,0.0016907098,0.0011536139,0.00054391817,0.0002450284],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0025045637,0.0008589026,0.09364446,0.0012352143,0.00044055856,0.0014991546,0.0015642979,0.30440834,0.01429092,0.038225207,0.0022193308,0.53910905],"study_design_scores_gemma":[0.00014722432,0.0037306983,0.5480745,0.0007634362,0.0015517863,0.0019167266,0.014512689,0.35780162,0.025153909,0.02107754,0.024990175,0.00027967815],"about_ca_topic_score_codex":0.0039927084,"about_ca_topic_score_gemma":0.010356827,"teacher_disagreement_score":0.0046032052,"about_ca_system_score_codex":0.0031339165,"about_ca_system_score_gemma":0.0011139123,"threshold_uncertainty_score":0.022738338},"labels":[],"label_agreement":null},{"id":"W2409080671","doi":"10.1061/40475(278)14","title":"Strategy: A Construction Simulation Environment","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"University of Toronto; Microsoft Research","keywords":"Session (web analytics); Economic shortage; Process (computing); Control (management); Computer science; Construction industry; Construction management; Process management; Engineering management; Operations research; Engineering; Construction engineering; Civil engineering","score_opus":0.006933019976336167,"score_gpt":0.18574715760726276,"score_spread":0.1788141376309266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2409080671","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02356841,0.0003809577,0.65539753,0.001280329,0.0003564129,0.0013689721,0.017851537,0.12988137,0.16991448],"genre_scores_gemma":[0.27924433,0.0013399719,0.5472657,0.0009636708,0.00012555956,0.0065512643,0.039136395,0.028939793,0.09643336],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994623,0.0001737576,0.00004009167,0.000059103895,0.00019828473,0.00006651062],"domain_scores_gemma":[0.9988624,0.00059552287,0.00003862657,0.00013004779,0.00021731498,0.00015621667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013475798,0.0011096657,0.00067098363,0.00071553246,0.00046987075,0.0018307196,0.0025559766,0.0014959403,0.08235229],"category_scores_gemma":[0.0026158728,0.00075624796,0.00069248,0.0006855439,0.0005100573,0.0012917202,0.001999808,0.0016015626,0.014527358],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001382605,0.0012230991,0.0047386503,0.00079345686,0.0001818408,0.0006621366,0.0013141023,0.35244387,0.012897766,0.122086816,0.36181015,0.14046551],"study_design_scores_gemma":[0.00087155594,0.00017344061,0.0010728788,0.000111287336,0.000066994595,0.0001900302,0.00013072595,0.43222,0.0067333374,0.026043799,0.532299,0.00008703693],"about_ca_topic_score_codex":0.0024994393,"about_ca_topic_score_gemma":0.0032547242,"teacher_disagreement_score":0.08235229,"about_ca_system_score_codex":0.00082549895,"about_ca_system_score_gemma":0.0013807162,"threshold_uncertainty_score":0.27549583},"labels":[],"label_agreement":null},{"id":"W2410994761","doi":"10.1061/40475(278)4","title":"An Activity-Based Data Acquisition and Job Costing Model: A Case Study","year":2000,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Activity-based costing; Job costing; Computer science; Data acquisition; Data modeling; Data model (GIS); Field (mathematics); Product cost management; Database; Artificial intelligence; Accounting; Business","score_opus":0.030024388147896975,"score_gpt":0.2733688871723672,"score_spread":0.2433444990244702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2410994761","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.66356707,0.00016481131,0.30160052,0.0017035716,0.00006226796,0.0015016084,0.001279229,0.00080905715,0.029311933],"genre_scores_gemma":[0.7734975,0.00021133873,0.21746257,0.00009051003,0.000011685952,0.0009665062,0.00066078856,0.00010707991,0.006991883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9979498,0.0011235983,0.00009552972,0.00016355113,0.0004939641,0.00017365173],"domain_scores_gemma":[0.99577844,0.0028508133,0.00016330721,0.00044400652,0.00044942414,0.0003139743],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028842224,0.00052705046,0.00045277638,0.0010267562,0.0013037397,0.0021513852,0.0019144425,0.0017203555,0.0032902185],"category_scores_gemma":[0.004318016,0.0005276848,0.00054478494,0.001607247,0.001108131,0.0021104247,0.001121793,0.0012453805,0.0006155754],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013177823,0.0046782666,0.048958056,0.000552349,0.000100580306,0.0061026975,0.006794304,0.64912605,0.007317652,0.09071034,0.009088806,0.1752531],"study_design_scores_gemma":[0.00023451728,0.0006353089,0.006863699,0.00010092448,0.000048084803,0.0009917993,0.002853482,0.9521047,0.006335099,0.007578842,0.022132445,0.00012106839],"about_ca_topic_score_codex":0.022892341,"about_ca_topic_score_gemma":0.026945679,"teacher_disagreement_score":0.022892341,"about_ca_system_score_codex":0.0029242882,"about_ca_system_score_gemma":0.0028390142,"threshold_uncertainty_score":0.04551822},"labels":[],"label_agreement":null},{"id":"W2418800452","doi":"","title":"ระบบการจดระบบความรดานวฒนธรรม (Cultural Knowledge Organization System)","year":2016,"lang":"th","type":"article","venue":"Journal of Information Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Knowledge management; Asset (computer security); Knowledge economy; Knowledge organization; Cultural knowledge; Cultural system; Value (mathematics); Process (computing); Dewey Decimal Classification; Business; Sociology; Computer science; Library classification; Library science; Social science","score_opus":0.007419785131254673,"score_gpt":0.22031633355555225,"score_spread":0.21289654842429756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2418800452","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05170012,0.0026692676,0.2422596,0.007896065,0.0011998537,0.0054276674,0.09143145,0.0760079,0.5214081],"genre_scores_gemma":[0.3814826,0.0031714763,0.30423182,0.002284466,0.00042938135,0.004978463,0.17001823,0.0023300278,0.13107347],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9969512,0.00067925785,0.0007752694,0.00043577745,0.0008161393,0.00034231864],"domain_scores_gemma":[0.9925305,0.0011508575,0.00090485223,0.0016092722,0.002973899,0.00083049596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004037092,0.00053089927,0.00048045907,0.0057554804,0.0020412917,0.007880505,0.0016165591,0.001453615,0.02060203],"category_scores_gemma":[0.011280711,0.0004127535,0.00076526345,0.0086475415,0.0008102595,0.0062973155,0.0033385488,0.0011980833,0.015331508],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036711368,0.0003568202,0.019872228,0.00111741,0.00016459117,0.00055916735,0.0026204812,0.004578201,0.0023953011,0.15465763,0.30366567,0.5096454],"study_design_scores_gemma":[0.00008189678,0.00009910607,0.007777276,0.00046927127,0.000087349945,0.0004666407,0.0012720977,0.0119425785,0.0031966185,0.03163334,0.942853,0.00012081072],"about_ca_topic_score_codex":0.0156249665,"about_ca_topic_score_gemma":0.007913395,"teacher_disagreement_score":0.02060203,"about_ca_system_score_codex":0.0031860117,"about_ca_system_score_gemma":0.0073230243,"threshold_uncertainty_score":0.06892061},"labels":[],"label_agreement":null},{"id":"W24300061","doi":"10.1016/j.jaging.2013.09.004","title":"Effective and Innovative Practices for Stronger Facilities Management.","year":2002,"lang":"en","type":"article","venue":"Facilities manager","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facility management; Business; Higher education; Process management; Operations management; Knowledge management; Environmental planning; Environmental resource management; Engineering management; Public relations; Marketing; Economic growth; Engineering; Computer science; Economics; Political science; Environmental science","score_opus":0.016078186429610147,"score_gpt":0.2183495313882825,"score_spread":0.20227134495867236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W24300061","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086808294,0.0072907447,0.116845354,0.14008962,0.0031814019,0.0030510803,0.00095300126,0.0039018888,0.63787866],"genre_scores_gemma":[0.53086823,0.0064523956,0.23525053,0.022859972,0.0011039115,0.0018068624,0.0010256164,0.00041776127,0.20021474],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99438477,0.002711702,0.00026320879,0.0005931609,0.0014477568,0.00059947907],"domain_scores_gemma":[0.99104816,0.001453555,0.0013824584,0.0020524096,0.0015986629,0.0024646844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006484124,0.0006475365,0.00024230721,0.0021844504,0.003355347,0.004284738,0.0028453993,0.002055077,0.04878224],"category_scores_gemma":[0.013743291,0.0003383626,0.00082963787,0.0012930527,0.0017547624,0.0050602886,0.007076174,0.0026448183,0.009050341],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004130391,0.0013303707,0.013294549,0.0008575305,0.000059051705,0.0003416751,0.0061592846,0.0009416195,0.0016646698,0.05368476,0.1453947,0.7762305],"study_design_scores_gemma":[0.00006707056,0.00038297728,0.03408469,0.0014436522,0.000055441422,0.00066313735,0.013892787,0.0012185604,0.0015856795,0.036693767,0.9098384,0.000073881754],"about_ca_topic_score_codex":0.005736093,"about_ca_topic_score_gemma":0.016354643,"teacher_disagreement_score":0.04878224,"about_ca_system_score_codex":0.0036142252,"about_ca_system_score_gemma":0.012692364,"threshold_uncertainty_score":0.16319281},"labels":[],"label_agreement":null},{"id":"W24670910","doi":"10.1097/hp.0000000000000005","title":"Contribution à l'évaluation de la vulnérabilité sismique d'un bâtiment hospitalier","year":2011,"lang":"en","type":"dissertation","venue":"Health Physics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.009410836879159615,"score_gpt":0.26351405445963044,"score_spread":0.25410321758047083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W24670910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9235972,0.028191697,0.014419807,0.003500506,0.00047346196,0.00045002846,0.0056962026,0.00016702584,0.023504134],"genre_scores_gemma":[0.97476894,0.006802796,0.0105255805,0.00034903467,0.00022234593,0.00040209407,0.0017625643,0.000075419885,0.0050912704],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9899837,0.0049894634,0.0006236178,0.00085510756,0.0031527556,0.00039532213],"domain_scores_gemma":[0.9788311,0.008467974,0.00362711,0.0010148258,0.007301842,0.00075717975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013197257,0.0013479623,0.0011087413,0.0041407067,0.00070174795,0.0041724606,0.0014073418,0.0011477475,0.008069248],"category_scores_gemma":[0.036507733,0.00042176605,0.0033362887,0.002729231,0.0008871551,0.0013198791,0.0017639407,0.0011144483,0.0010977586],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012544962,0.00034266498,0.80842614,0.001453831,0.0041450756,0.00013018728,0.0019550761,0.003280921,0.0004671287,0.0020668507,0.004048123,0.17242949],"study_design_scores_gemma":[0.00012504398,0.0012052752,0.9561234,0.0015319352,0.003622952,0.00054807705,0.0031125187,0.008012835,0.0010922598,0.0022951928,0.0221836,0.00014689531],"about_ca_topic_score_codex":0.085668035,"about_ca_topic_score_gemma":0.07459158,"teacher_disagreement_score":0.085668035,"about_ca_system_score_codex":0.0054164142,"about_ca_system_score_gemma":0.0053471625,"threshold_uncertainty_score":0.17033875},"labels":[],"label_agreement":null},{"id":"W2467360950","doi":"10.1007/978-3-319-30337-6_2","title":"Improving the Delivery of a Building","year":2016,"lang":"en","type":"book-chapter","venue":"Studies in computational intelligence","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Product (mathematics); Order (exchange); Computer science; New product development; Risk analysis (engineering); Manufacturing engineering; Process management; Business; Engineering; Marketing; Finance","score_opus":0.04317774568115721,"score_gpt":0.2815628624929318,"score_spread":0.23838511681177457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2467360950","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02253633,0.0075290827,0.45083594,0.007946546,0.0014587492,0.00012221461,0.00033215262,0.0027378574,0.5065011],"genre_scores_gemma":[0.38101774,0.019304277,0.29897162,0.0015230281,0.00047483694,0.00012088962,0.00076943653,0.0028895673,0.2949286],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988734,0.00021828678,0.000046240642,0.00012107109,0.00061018363,0.00013081134],"domain_scores_gemma":[0.9993723,0.00015943471,0.000045441404,0.00017837137,0.00019768273,0.000046937643],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014724355,0.00090084184,0.00044764302,0.0010311459,0.00091588515,0.0038470493,0.0017839812,0.001968241,0.024868727],"category_scores_gemma":[0.003973098,0.0004255157,0.00045142765,0.0016885294,0.0011278393,0.0055735684,0.0037517154,0.0018797008,0.008047586],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005994388,0.0000959355,0.00067505584,0.00039195584,0.000023663977,0.00018545102,0.0019455474,0.013346378,0.008978399,0.286197,0.029174853,0.65892583],"study_design_scores_gemma":[0.000017540802,0.00014361754,0.0017478213,0.0006120763,0.00006208894,0.00047044436,0.001977505,0.017710868,0.015487415,0.09290516,0.86882377,0.00004179664],"about_ca_topic_score_codex":0.0067167697,"about_ca_topic_score_gemma":0.006032922,"teacher_disagreement_score":0.024868727,"about_ca_system_score_codex":0.0017761835,"about_ca_system_score_gemma":0.0020853402,"threshold_uncertainty_score":0.083194196},"labels":[],"label_agreement":null},{"id":"W2471628524","doi":"","title":"Pinchin Limited – Acoustics and Vibration Team","year":2016,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reputation; Engineering; Engineering management; Management; Acoustics; Sociology; Physics","score_opus":0.0055719474810550645,"score_gpt":0.17074687558720567,"score_spread":0.1651749281061506,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2471628524","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04498807,0.0015110526,0.020455696,0.009047681,0.002292505,0.0009827643,0.002511421,0.004062898,0.9141478],"genre_scores_gemma":[0.098859675,0.0007020416,0.01505606,0.0016493112,0.00014729112,0.00044091302,0.0026027479,0.00088280876,0.8796591],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99527127,0.00021805016,0.000091499554,0.0006687429,0.0031243076,0.00062622706],"domain_scores_gemma":[0.9950283,0.0001639595,0.00007591666,0.0002793397,0.002508882,0.0019435757],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019909285,0.0008307501,0.00043448468,0.0015687174,0.00489198,0.00306607,0.0016150252,0.0009877754,0.19323067],"category_scores_gemma":[0.003012296,0.000669658,0.0003108487,0.0009903518,0.0011036578,0.0012081492,0.0047557033,0.0015836775,0.034973048],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048046923,0.0002828633,0.007877013,0.00025589103,0.000016216765,0.0010456251,0.002254512,0.00084595743,0.008445991,0.008747342,0.55734646,0.41240168],"study_design_scores_gemma":[0.000031088926,0.00011750193,0.005360906,0.000067966255,0.000010245138,0.00060620485,0.0012635576,0.0010329657,0.0011789484,0.00070278626,0.989594,0.000033935696],"about_ca_topic_score_codex":0.24930978,"about_ca_topic_score_gemma":0.48974138,"teacher_disagreement_score":0.24930978,"about_ca_system_score_codex":0.0058910158,"about_ca_system_score_gemma":0.030443855,"threshold_uncertainty_score":0.646421},"labels":[],"label_agreement":null},{"id":"W2474331869","doi":"10.3846/13923730.2014.914103","title":"EVALUATING MOTIVATION OF CONSTRUCTION WORKERS: A COMPARISON OF FUZZY RULE-BASED MODEL WITH THE TRADITIONAL EXPECTANCY THEORY","year":2016,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Expectancy theory; Fuzzy logic; Psychology; Productivity; Field (mathematics); Social psychology; Econometrics; Computer science; Mathematics; Artificial intelligence; Economics","score_opus":0.024623283852349673,"score_gpt":0.230449837680233,"score_spread":0.20582655382788334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2474331869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.759222,0.000491135,0.22430195,0.0003603596,0.00004475156,0.00033969642,0.00014521301,0.0001640817,0.014930898],"genre_scores_gemma":[0.9743833,0.00011447343,0.024729587,0.00002687413,0.0000072587513,0.00011877703,0.00007495547,0.00000419902,0.0005406205],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988079,0.00045890984,0.000081905506,0.00013559955,0.00041637712,0.00009927868],"domain_scores_gemma":[0.99686146,0.0020854794,0.00021919458,0.000098303615,0.00066922046,0.000066207416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029139456,0.00040864377,0.0005256572,0.0016588807,0.00042408702,0.0016800258,0.0010129826,0.00073715387,0.0013464334],"category_scores_gemma":[0.007278383,0.00016370804,0.001040438,0.0009123929,0.00040631348,0.0011232524,0.0003954875,0.00037539206,0.00015723702],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095382956,0.0017812874,0.14900495,0.00064361736,0.00049013016,0.00050502166,0.003996378,0.46697006,0.0051551,0.046153504,0.0018492823,0.3224969],"study_design_scores_gemma":[0.000064537075,0.00042340375,0.024256375,0.00009332167,0.0001349344,0.00008988551,0.00071912626,0.9624255,0.00086236163,0.010024112,0.00085694337,0.00004953158],"about_ca_topic_score_codex":0.009893335,"about_ca_topic_score_gemma":0.0050821174,"teacher_disagreement_score":0.009893335,"about_ca_system_score_codex":0.0016459862,"about_ca_system_score_gemma":0.0011004579,"threshold_uncertainty_score":0.0196715},"labels":[],"label_agreement":null},{"id":"W2475055653","doi":"","title":"KR Moeller Associates Ltd","year":2016,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Sound (geography); Telecommunications; Masking (illustration); Paging; Launched; Computer science; Operating system; Electrical engineering; Acoustics; Art; Visual arts","score_opus":0.005110296443099889,"score_gpt":0.16679909156581643,"score_spread":0.16168879512271656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2475055653","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026107489,0.008565449,0.010343764,0.0047729793,0.0024286828,0.0003095431,0.0031419813,0.0045567825,0.96327],"genre_scores_gemma":[0.0049075247,0.0032218143,0.003646794,0.00060547993,0.00011722929,0.000072850366,0.0014476045,0.0005885582,0.98539215],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966577,0.00020281538,0.00022273978,0.00074229774,0.0018992015,0.00027520515],"domain_scores_gemma":[0.9957028,0.00047774447,0.00026412203,0.00064441125,0.002103275,0.00080764754],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0018284955,0.0019306199,0.0009289383,0.004195202,0.0032798452,0.0066532884,0.0020278601,0.0030099999,0.6352098],"category_scores_gemma":[0.0038678474,0.0014091347,0.0009816987,0.0029636375,0.0014725729,0.0044965544,0.004290373,0.0031515711,0.49425608],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024474092,0.00011797823,0.0010748471,0.00067053677,0.000017043381,0.00083560025,0.00034765992,0.00044117356,0.0038256547,0.018332133,0.35497653,0.6191161],"study_design_scores_gemma":[0.000016544653,0.000031262647,0.0005157095,0.00018301606,0.0000075506478,0.0004907145,0.00013794636,0.00017344493,0.00052383577,0.0010883615,0.99681747,0.00001407046],"about_ca_topic_score_codex":0.01587856,"about_ca_topic_score_gemma":0.03406351,"teacher_disagreement_score":0.3647902,"about_ca_system_score_codex":0.002411449,"about_ca_system_score_gemma":0.007858621,"threshold_uncertainty_score":0.52032894},"labels":[],"label_agreement":null},{"id":"W2475332182","doi":"10.18564/jasss.3137","title":"Using Computational Modeling for Building Theory: A Double Edged Sword","year":2016,"lang":"en","type":"article","venue":"Journal of Artificial Societies and Social Simulation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; University of Saskatchewan","funders":"","keywords":"SWORD; Computer science; World Wide Web","score_opus":0.05917228946589022,"score_gpt":0.3056728969161877,"score_spread":0.2465006074502975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2475332182","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":"methods","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":"methods","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010689757,0.01161549,0.72763,0.20312025,0.0016417947,0.00021310982,0.00009156748,0.00045824758,0.044539727],"genre_scores_gemma":[0.39832187,0.010895256,0.56404114,0.01475818,0.0020531386,0.001285745,0.00010719513,0.0007868743,0.0077505964],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.92829764,0.05664311,0.0017889035,0.0023693142,0.01020768,0.0006933467],"domain_scores_gemma":[0.8342969,0.12364762,0.0025498834,0.0318959,0.0054226634,0.00218717],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.0631934,0.0020511388,0.0026783287,0.005759534,0.0061435895,0.018945172,0.0074941847,0.008107009,0.0058247456],"category_scores_gemma":[0.09601855,0.001853999,0.0022445708,0.0031729362,0.062373936,0.04214883,0.014978782,0.0149741825,0.0017249237],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021538912,0.000029593279,0.00035231296,0.0002069439,0.000048986887,0.00005678575,0.0023389503,0.0023485145,0.00008180916,0.97896886,0.0028847496,0.012660837],"study_design_scores_gemma":[0.00001784003,0.000021947211,0.00007905605,0.00028092938,0.000012620339,0.000081589904,0.00080017163,0.008067955,0.00015871087,0.9729164,0.01753258,0.000030230847],"about_ca_topic_score_codex":0.003764398,"about_ca_topic_score_gemma":0.0031744959,"teacher_disagreement_score":0.9368066,"about_ca_system_score_codex":0.00672176,"about_ca_system_score_gemma":0.0070153857,"threshold_uncertainty_score":0.3342026},"labels":[],"label_agreement":null},{"id":"W2476289924","doi":"10.1201/b17017-49","title":"Parallel processing of excavation in soils with randomly generated material properties","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Soil water; Excavation; Geology; Materials science; Environmental science; Geotechnical engineering; Soil science","score_opus":0.012429922533897764,"score_gpt":0.1708347779106173,"score_spread":0.15840485537671953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2476289924","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.066604145,0.0005200296,0.9164035,0.00019350792,0.000072508126,0.000055695687,0.0002633264,0.0013801206,0.014507172],"genre_scores_gemma":[0.38855413,0.0005957426,0.5950905,0.000060626982,0.00003447813,0.00015675869,0.0007725482,0.0005959476,0.014139332],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998122,0.00003588934,0.000008629606,0.000041992353,0.00007941445,0.000021955206],"domain_scores_gemma":[0.99966407,0.0001968026,0.000020920068,0.000043875883,0.00006344925,0.000010901903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032387374,0.0005916249,0.0006015965,0.00027245056,0.00040017176,0.00058829976,0.00069498277,0.00046271208,0.003700735],"category_scores_gemma":[0.0007994499,0.00037658744,0.0006212809,0.0007312333,0.00034484893,0.0005119774,0.0004982119,0.0004498685,0.00077162625],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001282595,0.000045411074,0.0005709236,0.00019677421,0.000023492232,0.00022640583,0.00013553804,0.8782883,0.012725805,0.009946848,0.0038887816,0.09382353],"study_design_scores_gemma":[0.000016788465,0.00002276241,0.0002605256,0.0000066590374,0.0000054384323,0.000070236965,0.000025744308,0.98348963,0.004938193,0.007379313,0.0037774385,0.0000072126577],"about_ca_topic_score_codex":0.0028476326,"about_ca_topic_score_gemma":0.004629235,"teacher_disagreement_score":0.003700735,"about_ca_system_score_codex":0.00042085673,"about_ca_system_score_gemma":0.00048750194,"threshold_uncertainty_score":0.012380183},"labels":[],"label_agreement":null},{"id":"W2477021807","doi":"10.1142/9789813143401_0061","title":"Numerical simulation of dust concentration distribution in construction industries","year":2016,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Distribution (mathematics); Computer simulation; Environmental science; Computer science; Mining engineering; Geology; Simulation; Mathematics","score_opus":0.00957749326127136,"score_gpt":0.21279902698253683,"score_spread":0.20322153372126547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2477021807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96976894,0.00025393226,0.013435654,0.0003745192,0.00007009847,0.000031584226,0.0003214186,0.00016495,0.01557896],"genre_scores_gemma":[0.9969066,0.000058981834,0.0018239843,0.000020487549,0.0000062627273,0.000013839228,0.00007444301,0.000010043856,0.0010852491],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977344,0.00004942369,0.000013488741,0.000035309124,0.000056246306,0.00007206201],"domain_scores_gemma":[0.9990945,0.00051420333,0.000084655476,0.000054715787,0.000161292,0.00009068195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040898361,0.00043889869,0.0008368152,0.0007718385,0.0008866823,0.0009956681,0.0010222436,0.0020550448,0.0024385056],"category_scores_gemma":[0.0015338361,0.00052791025,0.00067186763,0.0012651471,0.0009070989,0.00058169675,0.00074306567,0.0007685393,0.00018124036],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054850792,0.00007981733,0.0032254271,0.000019255302,0.000010014511,0.000066656234,0.000026608477,0.99381196,0.0004965724,0.00097626605,0.00012664073,0.0011058499],"study_design_scores_gemma":[0.000011240981,0.000011766469,0.00073100405,0.0000028127656,0.0000032531589,0.000006912171,0.000025601597,0.9986822,0.00023576336,0.00019158052,0.00009339845,0.000004426207],"about_ca_topic_score_codex":0.041136928,"about_ca_topic_score_gemma":0.018054366,"teacher_disagreement_score":0.041136928,"about_ca_system_score_codex":0.0012422127,"about_ca_system_score_gemma":0.0010245778,"threshold_uncertainty_score":0.08179498},"labels":[],"label_agreement":null},{"id":"W2477850933","doi":"10.1007/978-3-319-33681-7_42","title":"BIM for Corporate Real Estate Data Visualization from Disparate Systems","year":2016,"lang":"en","type":"book-chapter","venue":"Lecture notes of the Institute for Computer Sciences, Social Informatics and Telecommunications Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Property management; Corporate Real Estate; Real estate; Facility management; Visualization; Context (archaeology); Computer science; Data science; Building information modeling; Data management; Management information systems; Information visualization; Information system; Knowledge management; Systems engineering; Engineering; Business; Data mining; Finance; Scheduling (production processes); Operations management","score_opus":0.048771580604293006,"score_gpt":0.2537880483949996,"score_spread":0.20501646779070656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2477850933","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027288676,0.0032309424,0.96218204,0.00047012555,0.00026300485,0.000051040646,0.00039963526,0.0043472354,0.026327064],"genre_scores_gemma":[0.07920838,0.0054110033,0.8722135,0.00023105061,0.0001449748,0.00013449354,0.0019804947,0.0019456607,0.038730487],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993717,0.00011003796,0.000029240387,0.000073429685,0.0003773186,0.00003834486],"domain_scores_gemma":[0.99963653,0.00014362634,0.000014915909,0.00009994714,0.00008862082,0.000016380578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007382136,0.0011715273,0.0007756567,0.0016332896,0.00047760454,0.0030622724,0.0016084205,0.0010854118,0.01496053],"category_scores_gemma":[0.0014407919,0.0010030819,0.0008278918,0.0024103252,0.0006369383,0.0026750178,0.0025261622,0.00172234,0.005261928],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000371686,0.000057059093,0.00041285512,0.0005345945,0.00006465649,0.00028908727,0.0006061506,0.031309344,0.009386261,0.14014478,0.06116338,0.75599474],"study_design_scores_gemma":[0.000016429713,0.000049744624,0.001148198,0.00042721862,0.00006357655,0.0013883978,0.00040484118,0.32235664,0.017688313,0.16306038,0.4933126,0.00008367873],"about_ca_topic_score_codex":0.0018631713,"about_ca_topic_score_gemma":0.0038704239,"teacher_disagreement_score":0.01496053,"about_ca_system_score_codex":0.00056508824,"about_ca_system_score_gemma":0.0006188715,"threshold_uncertainty_score":0.050047934},"labels":[],"label_agreement":null},{"id":"W2485420449","doi":"10.1061/(asce)co.1943-7862.0001214","title":"Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Work breakdown structure; Computer science; Flow network; Network planning and design; Industrial engineering; Operations research; Reliability engineering; Engineering; Systems engineering; Project management; Project planning; Mathematical optimization","score_opus":0.013858113457767695,"score_gpt":0.2069908226303679,"score_spread":0.1931327091726002,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2485420449","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010279611,0.000049162933,0.98728,0.000055685265,0.000008737031,0.00007908466,0.000126155,0.0002726942,0.0018488015],"genre_scores_gemma":[0.42854565,0.00025913102,0.5667556,0.000055220185,0.000020026242,0.0007027774,0.000711855,0.00016541261,0.0027843844],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965763,0.00010156196,0.000016166226,0.000073643365,0.00010594233,0.000044964338],"domain_scores_gemma":[0.99953127,0.00023993722,0.00007566747,0.00003329529,0.000095097,0.000024795872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069530436,0.000987146,0.00072961283,0.0012223102,0.00045408795,0.0009907925,0.0010717334,0.00072944356,0.002879495],"category_scores_gemma":[0.0014960663,0.0006653947,0.0008914134,0.0009887632,0.00043264986,0.0012407121,0.0008553035,0.0007385422,0.00036911215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000670483,0.000012553155,0.0001963848,0.000018832661,0.0000046184973,0.000014312425,0.00001306961,0.98950523,0.00029049267,0.0017363116,0.00014408283,0.008057419],"study_design_scores_gemma":[0.0000016565765,0.0000040709224,0.000034411216,0.0000020605498,0.0000013768134,0.0000030370672,0.000005036419,0.9988803,0.000121998346,0.00078966655,0.000155015,0.0000013754511],"about_ca_topic_score_codex":0.0128180105,"about_ca_topic_score_gemma":0.013597593,"teacher_disagreement_score":0.0128180105,"about_ca_system_score_codex":0.0014486422,"about_ca_system_score_gemma":0.002224006,"threshold_uncertainty_score":0.025486827},"labels":[],"label_agreement":null},{"id":"W2487401600","doi":"","title":"CIVCAP 2012: Laying Concrete Foundations","year":2012,"lang":"en","type":"article","venue":"BIBSYS Brage (BIBSYS (Norway))","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Laying; Engineering; Structural engineering","score_opus":0.017122887083368867,"score_gpt":0.22785389338858558,"score_spread":0.2107310063052167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2487401600","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004974063,0.014614949,0.031922087,0.6014231,0.04151615,0.0024236746,0.004549637,0.003633614,0.29494274],"genre_scores_gemma":[0.115858294,0.03201046,0.19523838,0.26934382,0.014695694,0.010275129,0.018233001,0.003921934,0.34042332],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9827663,0.005916796,0.00094663916,0.0012834303,0.0040422943,0.0050445404],"domain_scores_gemma":[0.95848817,0.007510398,0.0017290413,0.0036262244,0.007994487,0.020651715],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04440928,0.002108358,0.000965681,0.0030537725,0.00989768,0.031903,0.005037636,0.035303235,0.095074095],"category_scores_gemma":[0.040103566,0.002108338,0.0021191179,0.0020899174,0.007238666,0.02273831,0.023045717,0.03263757,0.042706426],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000113160146,0.00042741557,0.0006379476,0.0015219072,0.000019334491,0.00056721806,0.001397963,0.0013596328,0.0008133277,0.19774516,0.7291197,0.06627714],"study_design_scores_gemma":[0.000032118747,0.00008067332,0.0008515817,0.0019253605,0.000006990038,0.000068741014,0.0014033797,0.000396152,0.00038612657,0.019788869,0.97498727,0.00007274138],"about_ca_topic_score_codex":0.026410881,"about_ca_topic_score_gemma":0.029987194,"teacher_disagreement_score":0.095074095,"about_ca_system_score_codex":0.011401607,"about_ca_system_score_gemma":0.09880615,"threshold_uncertainty_score":0.3180545},"labels":[],"label_agreement":null},{"id":"W2491560895","doi":"10.1061/(asce)co.1943-7862.0001213","title":"Genetic Algorithm–Simulation Framework for Decision Making in Construction Site Layout Planning","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"","keywords":"Closeness; Genetic algorithm; Heuristic; Computer science; Function (biology); Mathematical optimization; Industrial engineering; Algorithm; Machine learning; Engineering; Artificial intelligence; Mathematics","score_opus":0.006844433011699463,"score_gpt":0.23554017794394233,"score_spread":0.22869574493224287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2491560895","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0040753633,0.0002204159,0.9895834,0.00023558126,0.000032816683,0.00006786553,0.000057875,0.00016981977,0.0055568507],"genre_scores_gemma":[0.31167284,0.0008930417,0.6816213,0.00016557875,0.00006149776,0.000827925,0.00025920212,0.00012044238,0.004378119],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988374,0.000721215,0.000039959603,0.00010967068,0.00021813864,0.00007357017],"domain_scores_gemma":[0.99861145,0.0010021202,0.00008824899,0.000048995105,0.0001957785,0.00005335677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019728455,0.0013242131,0.0013513718,0.0013892892,0.00081251876,0.0016759193,0.002425461,0.0019038954,0.0033336545],"category_scores_gemma":[0.0036941462,0.00067883584,0.0012830183,0.0016643949,0.0014879325,0.001254024,0.00113653,0.0015884361,0.0004481748],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000052453856,0.000007826253,0.000094884745,0.00001372581,0.000012763056,0.000019868088,0.000015455793,0.98073065,0.00007693886,0.016444873,0.00012350756,0.0024543095],"study_design_scores_gemma":[0.000006678141,0.0000068314507,0.000020753352,0.0000068941035,0.000003909795,0.0000056662047,0.000006216264,0.99129945,0.000046877267,0.008029738,0.0005631351,0.00000383827],"about_ca_topic_score_codex":0.023300858,"about_ca_topic_score_gemma":0.014018693,"teacher_disagreement_score":0.023300858,"about_ca_system_score_codex":0.0023668716,"about_ca_system_score_gemma":0.0034367286,"threshold_uncertainty_score":0.046330452},"labels":[],"label_agreement":null},{"id":"W2499344398","doi":"10.1090/fim/027/07","title":"Lift-and-project procedures for combinatorial optimization problems","year":2010,"lang":"en","type":"book-chapter","venue":"American Mathematical Society eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Lift (data mining); Computer science; Operations research; Engineering; Data mining","score_opus":0.010604323546826094,"score_gpt":0.2209967224266219,"score_spread":0.21039239887979583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499344398","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016378098,0.0010021451,0.9671705,0.00018970201,0.00015881367,0.00004723935,0.00006028168,0.00033991935,0.029393606],"genre_scores_gemma":[0.045051362,0.002610682,0.9045875,0.00019818316,0.00031108403,0.0003400859,0.00032723136,0.000886409,0.045687344],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99925476,0.0002353572,0.000034909735,0.000085229025,0.0003443257,0.000045378813],"domain_scores_gemma":[0.9993723,0.00040645193,0.000018927429,0.0000940987,0.00008699637,0.00002122128],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010584021,0.0016599149,0.0013464001,0.0013499632,0.0010457619,0.0017896761,0.0014974873,0.0010856356,0.0129417805],"category_scores_gemma":[0.0035955464,0.00085867435,0.0016142082,0.0023902785,0.0019438631,0.002553289,0.0020194906,0.005380315,0.0040201577],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035477267,0.00010405653,0.00010991555,0.00023787982,0.000039230225,0.00006683171,0.00015783118,0.035988733,0.0020415701,0.61202735,0.023533767,0.32565737],"study_design_scores_gemma":[0.000025265803,0.000035612622,0.00015932896,0.00006787961,0.000025525209,0.00012896665,0.00004989193,0.15689199,0.0018313625,0.7981884,0.042564347,0.000031534215],"about_ca_topic_score_codex":0.0017250758,"about_ca_topic_score_gemma":0.0036589634,"teacher_disagreement_score":0.0129417805,"about_ca_system_score_codex":0.0010020493,"about_ca_system_score_gemma":0.0012483109,"threshold_uncertainty_score":0.04329455},"labels":[],"label_agreement":null},{"id":"W2499962443","doi":"","title":"Design and Construction of Building Components with Fibre Reinforced Polymer - A New Canadian Standard","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Architectural engineering; Forensic engineering","score_opus":0.009436331957811826,"score_gpt":0.1854103358008165,"score_spread":0.17597400384300468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2499962443","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22556943,0.00081107335,0.53467584,0.00079209555,0.00017994302,0.00040416812,0.0007945059,0.0014364846,0.23533642],"genre_scores_gemma":[0.5208649,0.00096058275,0.3865801,0.00008814908,0.000010074013,0.0001062552,0.0007486093,0.00039099596,0.09025037],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980761,0.00008118153,0.000044998906,0.000106076055,0.0015526747,0.00013895937],"domain_scores_gemma":[0.9994679,0.000021155127,0.000019398823,0.00006647789,0.00038534254,0.00003967525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011412209,0.0004958721,0.0003105874,0.0010578189,0.0013778284,0.0020599167,0.0015100202,0.0005413048,0.0039204652],"category_scores_gemma":[0.0010276517,0.00035782738,0.0004503772,0.0014198857,0.0013262433,0.00089976564,0.0009697275,0.0006848146,0.0006736279],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023278085,0.00019320141,0.006828366,0.00029721577,0.00003294747,0.0003200908,0.0013263788,0.15437222,0.06725887,0.29289162,0.01283649,0.46340984],"study_design_scores_gemma":[0.00007439541,0.0004442768,0.026241593,0.00017428146,0.00012624817,0.00072705914,0.0014209119,0.31521273,0.09888093,0.031602662,0.52486783,0.0002271048],"about_ca_topic_score_codex":0.49619976,"about_ca_topic_score_gemma":0.7622846,"teacher_disagreement_score":0.5038003,"about_ca_system_score_codex":0.008582831,"about_ca_system_score_gemma":0.01647907,"threshold_uncertainty_score":0.9866231},"labels":[],"label_agreement":null},{"id":"W2503295872","doi":"10.1007/978-3-319-62274-3","title":"Engineering Asset Management 2016","year":2017,"lang":"en","type":"book","venue":"Lecture notes in mechanical engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Asset management; Asset (computer security); Engineering management; Business; Engineering; Computer science; Computer security; Finance","score_opus":0.005742518098853264,"score_gpt":0.1950162841404571,"score_spread":0.18927376604160384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2503295872","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018401021,0.042947605,0.03873027,0.0027246114,0.005235843,0.000053596188,0.001191573,0.0015400634,0.90573627],"genre_scores_gemma":[0.006905558,0.016457379,0.003645038,0.0002161908,0.000590966,0.000033023225,0.0010307464,0.00036790062,0.97075313],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966884,0.000019959309,0.000017024431,0.00006438649,0.00020394873,0.000025918689],"domain_scores_gemma":[0.9997495,0.00003596476,0.000015952934,0.000056226516,0.000103743456,0.000038713668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039378615,0.0012754501,0.0009974207,0.001967284,0.00064763863,0.0031230084,0.0007908236,0.0008290783,0.10350188],"category_scores_gemma":[0.00089208205,0.000616311,0.0003706598,0.0027975303,0.00054852734,0.0025199638,0.001589396,0.0015079675,0.07893627],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017888795,0.000042368727,0.00013191043,0.00015635038,0.000008616821,0.000035027766,0.000073189985,0.0028862932,0.000808636,0.026359618,0.36754522,0.60193485],"study_design_scores_gemma":[0.000003138057,0.000012760409,0.000505816,0.00024146936,0.0000074839077,0.00009114371,0.000057451278,0.0022818102,0.00053272245,0.028563589,0.9676935,0.0000090976055],"about_ca_topic_score_codex":0.0032422137,"about_ca_topic_score_gemma":0.009031641,"teacher_disagreement_score":0.10350188,"about_ca_system_score_codex":0.001537844,"about_ca_system_score_gemma":0.0013773699,"threshold_uncertainty_score":0.34624833},"labels":[],"label_agreement":null},{"id":"W2504132119","doi":"10.1155/2016/2312057","title":"An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations","year":2016,"lang":"en","type":"article","venue":"Journal of Construction Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Scheduling (production processes); Schedule; Operations research; Parametric statistics; Randomness; Conceptual design; Industrial engineering; Engineering; Computer science; Systems engineering; Operations management","score_opus":0.008098464830622399,"score_gpt":0.21725553795565705,"score_spread":0.20915707312503465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2504132119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018935356,0.00005393411,0.97071236,0.000054047025,0.000025499057,0.00019355945,0.00023971345,0.0058716866,0.003913754],"genre_scores_gemma":[0.30187783,0.000106509586,0.6923855,0.000077682635,0.00002085797,0.00040686876,0.00055889745,0.00016256237,0.004403267],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995172,0.000088449495,0.000049528448,0.00016178522,0.00013799309,0.00004506091],"domain_scores_gemma":[0.9990796,0.0003603769,0.00007998536,0.000107550084,0.00031361054,0.000058802456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009328587,0.0006524576,0.00059907633,0.00067180616,0.00043462802,0.0008244252,0.0011009648,0.00086326845,0.008391183],"category_scores_gemma":[0.0025075937,0.00035657763,0.000368723,0.00038299797,0.00018050945,0.0006072552,0.0006076417,0.0005988348,0.0013820574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006262047,0.0004842605,0.0024212725,0.0003189714,0.000087964436,0.0004931528,0.0004056193,0.42829412,0.051455107,0.0054679965,0.008301876,0.5016434],"study_design_scores_gemma":[0.000060592738,0.00008458904,0.0004995501,0.000017710292,0.000029334791,0.00006998441,0.000047622012,0.98869073,0.0048853448,0.0012209909,0.004375976,0.000017560944],"about_ca_topic_score_codex":0.004244579,"about_ca_topic_score_gemma":0.0055269394,"teacher_disagreement_score":0.008391183,"about_ca_system_score_codex":0.0005361545,"about_ca_system_score_gemma":0.0014963277,"threshold_uncertainty_score":0.028071284},"labels":[],"label_agreement":null},{"id":"W2507978271","doi":"10.1136/oemed-2016-103951.443","title":"P126 A task-based silica exposure modelling tool for construction companies","year":2016,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Task (project management); Computer science; Engineering; Systems engineering","score_opus":0.01232358746627903,"score_gpt":0.19352111432038285,"score_spread":0.1811975268541038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2507978271","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013434144,0.00026120056,0.8151132,0.0008091193,0.00015559501,0.0011089619,0.051493645,0.09354021,0.024083849],"genre_scores_gemma":[0.10358567,0.0007668938,0.7558916,0.00051032775,0.00007238255,0.0035537155,0.09576841,0.014114783,0.025736095],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992488,0.00017716388,0.0000966053,0.000125064,0.00030993545,0.000042344393],"domain_scores_gemma":[0.99632674,0.0023651924,0.00019546792,0.00035601345,0.000651988,0.000104585735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020704288,0.001514601,0.0006363055,0.0020450952,0.0005381933,0.0020938723,0.00220852,0.001168099,0.043246325],"category_scores_gemma":[0.008088429,0.0009831594,0.002028827,0.0014581596,0.00027699457,0.0017774979,0.0021856232,0.0012299881,0.011735765],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005475882,0.00079333637,0.013809385,0.0028722312,0.0003338918,0.0012154008,0.0015443307,0.33221352,0.0078028245,0.02737951,0.32490897,0.28657904],"study_design_scores_gemma":[0.00025617584,0.00016174598,0.0042322804,0.00047035425,0.00008256773,0.00041150142,0.00024722307,0.6362647,0.004690105,0.026119394,0.32694107,0.0001228463],"about_ca_topic_score_codex":0.009638894,"about_ca_topic_score_gemma":0.010932619,"teacher_disagreement_score":0.043246325,"about_ca_system_score_codex":0.0009548063,"about_ca_system_score_gemma":0.0019384846,"threshold_uncertainty_score":0.1446734},"labels":[],"label_agreement":null},{"id":"W2513817582","doi":"","title":"Changing Standards for Building Acoustics Regulation","year":2016,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ceiling (cloud); Flanking maneuver; Transmission (telecommunications); Sound transmission class; Architectural acoustics; Engineering; European standard; National standard; Class (philosophy); Structural engineering; Computer science; Acoustics; Engineering drawing; Architectural engineering; Telecommunications; Civil engineering; Electrical engineering","score_opus":0.007509003998366023,"score_gpt":0.21127605355599044,"score_spread":0.20376704955762442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2513817582","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0156334,0.008145701,0.11939982,0.06315271,0.016127793,0.0010842725,0.00270818,0.0042861933,0.7694619],"genre_scores_gemma":[0.19266869,0.010717012,0.27078754,0.05485012,0.003210027,0.002261821,0.010162831,0.0034756414,0.45186627],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.82185054,0.009344991,0.00801048,0.0067804046,0.14735667,0.006656887],"domain_scores_gemma":[0.82916504,0.008995064,0.0018341445,0.010517282,0.14684024,0.0026481843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.04225275,0.0010782146,0.0010622764,0.0045746244,0.005594475,0.011018527,0.008183667,0.0075321626,0.006664081],"category_scores_gemma":[0.06816796,0.001062365,0.0016737593,0.0044209966,0.007819621,0.004497748,0.0042500906,0.009641153,0.005574068],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049060367,0.00016375633,0.0023084427,0.00037275298,0.000021567557,0.00018561776,0.0032209281,0.0022959379,0.003657698,0.6273793,0.24532709,0.115017794],"study_design_scores_gemma":[0.000012865104,0.000027442491,0.00308287,0.00044676807,0.000023235298,0.00011496906,0.0005695348,0.0010480668,0.0014117606,0.013684904,0.9794862,0.00009127759],"about_ca_topic_score_codex":0.6420905,"about_ca_topic_score_gemma":0.50742865,"teacher_disagreement_score":0.3579095,"about_ca_system_score_codex":0.04192395,"about_ca_system_score_gemma":0.11702894,"threshold_uncertainty_score":0.7200346},"labels":[],"label_agreement":null},{"id":"W2515918935","doi":"","title":"Opzetten van een begrotingsprogramma voor hout-gestookte warmtekrachtkoppelingen in Excel","year":2015,"lang":"nl","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Art; Humanities","score_opus":0.027416961460970567,"score_gpt":0.23839849379551845,"score_spread":0.2109815323345479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2515918935","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06178581,0.0008832785,0.4516568,0.0029664526,0.0008590537,0.0016155232,0.009472048,0.08180422,0.38895676],"genre_scores_gemma":[0.1332292,0.0019909737,0.39459974,0.0017352264,0.0003283874,0.00224718,0.01743128,0.028006896,0.42043117],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99734604,0.0005904428,0.00023853863,0.0005585386,0.00093399134,0.00033241976],"domain_scores_gemma":[0.99590486,0.0018523701,0.00023853836,0.00073720363,0.0007800688,0.00048691023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002216031,0.0013344149,0.0005990324,0.0011115612,0.0009751516,0.0051000337,0.0015955004,0.0008600837,0.071425095],"category_scores_gemma":[0.006726337,0.00086437963,0.0010313842,0.0009570637,0.0008250924,0.003726997,0.0031892024,0.0028840443,0.054404076],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017421759,0.00087742903,0.0065036407,0.0018246567,0.00007988926,0.001093412,0.011653545,0.0035911212,0.05541512,0.08152957,0.17561167,0.66007763],"study_design_scores_gemma":[0.00012314889,0.00023463211,0.004121444,0.0004177129,0.000057981564,0.0004566696,0.0014989943,0.004137656,0.042686716,0.017540004,0.92860395,0.00012114765],"about_ca_topic_score_codex":0.001962895,"about_ca_topic_score_gemma":0.0024696388,"teacher_disagreement_score":0.071425095,"about_ca_system_score_codex":0.0009728336,"about_ca_system_score_gemma":0.002222768,"threshold_uncertainty_score":0.23894078},"labels":[],"label_agreement":null},{"id":"W2522637456","doi":"10.11159/mhci16.107","title":"Comparing Simulation Use Cases in Building Design for Developing an User-centric Simulation Platform","year":2016,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Electrical Engineering and Computer Systems and Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation of Korea; Ministry of Trade, Industry and Energy; National Research Foundation","keywords":"Computer science; User-centered design; Human–computer interaction","score_opus":0.03347910385449664,"score_gpt":0.2447680538223828,"score_spread":0.21128894996788614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2522637456","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.634385,0.00015431755,0.33426806,0.00024469415,0.000059110083,0.001056317,0.0007392031,0.0026640743,0.02642915],"genre_scores_gemma":[0.8494685,0.00009265274,0.14747709,0.000023843191,0.0000058537066,0.00038773267,0.0008937863,0.00028635346,0.0013641462],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972389,0.0015925035,0.00019709881,0.00012635044,0.0006690034,0.00017610007],"domain_scores_gemma":[0.9920019,0.0051924554,0.00027864656,0.0010808846,0.001243594,0.0002025417],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038258808,0.0010629472,0.0005457225,0.002959879,0.0006466019,0.0021983196,0.00166538,0.0013118933,0.004920052],"category_scores_gemma":[0.012021393,0.00083726103,0.0009802651,0.0013456849,0.00057447725,0.002116533,0.0014766059,0.00064999517,0.00069284503],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069519173,0.0015129109,0.016420541,0.0003513739,0.00014914361,0.00034295424,0.0012706425,0.8603763,0.011251157,0.018581644,0.0018741558,0.08717403],"study_design_scores_gemma":[0.000045178465,0.00014453332,0.0016107658,0.000043991895,0.000043871234,0.000043057495,0.0002890384,0.98460776,0.008571838,0.0018696734,0.0027083114,0.000022007729],"about_ca_topic_score_codex":0.006646941,"about_ca_topic_score_gemma":0.0109661175,"teacher_disagreement_score":0.006646941,"about_ca_system_score_codex":0.0014600111,"about_ca_system_score_gemma":0.0013307312,"threshold_uncertainty_score":0.020233452},"labels":[],"label_agreement":null},{"id":"W2523796925","doi":"","title":"Proceedings of the Sixth International Conference on Computer Supported Cooperative Work in Design","year":2001,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Engineering ethics; Engineering; Computer science; Library science; Political science; Mechanical engineering","score_opus":0.02304660526378758,"score_gpt":0.2195747848954352,"score_spread":0.19652817963164762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2523796925","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034601036,0.009942173,0.2905187,0.004930802,0.02516086,0.00080652774,0.001349656,0.0069265584,0.6257637],"genre_scores_gemma":[0.051641863,0.005607466,0.065544605,0.000499222,0.00097340695,0.0003500137,0.00318197,0.0009266739,0.87127477],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99940526,0.00014783187,0.000031375723,0.00007493055,0.00027142846,0.00006920624],"domain_scores_gemma":[0.99883956,0.0002714345,0.00001888664,0.00019152994,0.00043846908,0.00024016686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016292692,0.00069645763,0.0009518489,0.0006586745,0.00095196813,0.0034491215,0.0011325183,0.00090583134,0.1572794],"category_scores_gemma":[0.001881131,0.0003816121,0.0005095772,0.0005705084,0.0005823589,0.001383105,0.0014229504,0.0013392013,0.06229381],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00076476886,0.0008202386,0.0012140557,0.00029695744,0.000044192777,0.00019764714,0.00065238087,0.0008166256,0.010563069,0.006643432,0.45247898,0.5255075],"study_design_scores_gemma":[0.00010514355,0.00020119954,0.002342389,0.0001412759,0.00005592083,0.00025701046,0.0004091538,0.005852999,0.0055914884,0.0035015375,0.9815134,0.000028480945],"about_ca_topic_score_codex":0.0035434023,"about_ca_topic_score_gemma":0.010332925,"teacher_disagreement_score":0.1572794,"about_ca_system_score_codex":0.0005096734,"about_ca_system_score_gemma":0.0015205157,"threshold_uncertainty_score":0.526152},"labels":[],"label_agreement":null},{"id":"W2525860097","doi":"10.1139/cjce-2015-0001","title":"Building information modeling utilization for optimizing milling quantity and hot mix asphalt pavement overlay quality","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Overlay; Asphalt pavement; Slab; Asphalt; Visualization; Quality (philosophy); Engineering; Civil engineering; Computer science; Structural engineering; Materials science; Mechanical engineering; Composite material","score_opus":0.0263410954656055,"score_gpt":0.2314885274591873,"score_spread":0.2051474319935818,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2525860097","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2717846,0.00012818913,0.7144231,0.00014104717,0.000017475193,0.00015271199,0.0003343033,0.0022355805,0.010783027],"genre_scores_gemma":[0.81376755,0.00010591605,0.18458496,0.000013847831,0.000002013262,0.0000807125,0.00030063975,0.00012353943,0.0010207904],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99945,0.00010048601,0.000026477757,0.000062720064,0.0002955322,0.00006486869],"domain_scores_gemma":[0.9994802,0.00016316102,0.00006691269,0.00008959878,0.00017475666,0.000025286772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008145028,0.0008678061,0.00060737506,0.0009886976,0.00040062386,0.0010789349,0.0008035007,0.0004571647,0.0011949382],"category_scores_gemma":[0.0015029903,0.000488541,0.0005820503,0.0009008393,0.0002588118,0.0010358193,0.00072985096,0.00043759547,0.00027052354],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000075369775,0.00010770367,0.0022897217,0.000056047033,0.000018197472,0.000055375473,0.00009016589,0.9290981,0.0209355,0.0027676015,0.00029935755,0.044206847],"study_design_scores_gemma":[0.000006302231,0.000043012602,0.0006438936,0.0000041307394,0.000021087184,0.000012280822,0.000028500472,0.9847713,0.013092527,0.00051279966,0.00085428276,0.000009820013],"about_ca_topic_score_codex":0.0106631955,"about_ca_topic_score_gemma":0.016957626,"teacher_disagreement_score":0.0106631955,"about_ca_system_score_codex":0.0010200144,"about_ca_system_score_gemma":0.0017000919,"threshold_uncertainty_score":0.021202207},"labels":[],"label_agreement":null},{"id":"W2531194942","doi":"10.1016/j.rser.2016.12.061","title":"Application of nD BIM Integrated Knowledge-based Building Management System (BIM-IKBMS) for inspecting post-construction energy efficiency","year":2017,"lang":"en","type":"article","venue":"Renewable and Sustainable Energy Reviews","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Construction engineering; Efficient energy use; Architectural engineering; Engineering; Systems engineering; Computer science; Manufacturing engineering; Operations management","score_opus":0.007858286542553961,"score_gpt":0.22844925319257448,"score_spread":0.2205909666500205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531194942","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46526203,0.001706025,0.48159423,0.00036352148,0.0002479435,0.00027192236,0.0015184985,0.0037098997,0.045325875],"genre_scores_gemma":[0.81722605,0.00076846057,0.17689496,0.000060357783,0.000016284088,0.00007552368,0.0005979163,0.0000883182,0.0042721927],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99933904,0.00009107791,0.000035374793,0.00009998746,0.00038515215,0.00004931405],"domain_scores_gemma":[0.99968076,0.00005672719,0.000032559165,0.00006344322,0.00015043981,0.000016159665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007971681,0.00047126328,0.00035822397,0.0015710719,0.00035609235,0.001130807,0.00059594586,0.00070190546,0.0025791666],"category_scores_gemma":[0.0009858974,0.0002166275,0.00048171994,0.0013481003,0.00022396384,0.00080103753,0.0010222114,0.00031376598,0.00054134533],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035180472,0.00039233515,0.036588617,0.00069102074,0.000092092174,0.000364308,0.000770796,0.036664266,0.121995784,0.0056105433,0.0038076488,0.79267085],"study_design_scores_gemma":[0.000050335533,0.0004470333,0.09930931,0.00027423978,0.00031547813,0.0010490231,0.0015335397,0.5796056,0.25546545,0.0052575306,0.056556966,0.00013559432],"about_ca_topic_score_codex":0.0032844502,"about_ca_topic_score_gemma":0.0060879267,"teacher_disagreement_score":0.0032844502,"about_ca_system_score_codex":0.0005168146,"about_ca_system_score_gemma":0.0009485639,"threshold_uncertainty_score":0.00862813},"labels":[],"label_agreement":null},{"id":"W2531535670","doi":"10.5539/mas.v11n1p48","title":"The Importance and Use of Risk Management in Various Stages of Construction Projects Life Cycle (PLC)","year":2016,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Risk analysis (engineering); Process (computing); Risk management; Business; Product life-cycle management; Balance (ability); Construction management; Process management; Order (exchange); Risk management plan; Operations management; Computer science; IT risk management; Engineering; Marketing; Civil engineering; Finance","score_opus":0.00972740312757443,"score_gpt":0.2021196966113639,"score_spread":0.19239229348378947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2531535670","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56649995,0.0050416547,0.32335114,0.0034516747,0.000107688196,0.00086860365,0.00027088614,0.00053175143,0.0998765],"genre_scores_gemma":[0.9220244,0.0011773469,0.073534034,0.00006815049,0.000019267198,0.00015804775,0.00008519185,0.000036727954,0.0028967592],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9922018,0.0037191862,0.0007743884,0.00044742937,0.0024649121,0.00039229312],"domain_scores_gemma":[0.98527664,0.006845063,0.0035221556,0.00094944966,0.002933132,0.00047357447],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006511731,0.0005313663,0.00025130992,0.003094619,0.001109224,0.0046820827,0.0006651449,0.00071798527,0.0012373746],"category_scores_gemma":[0.014713724,0.00039105542,0.0004909442,0.0017701936,0.0014123296,0.003346474,0.0020432014,0.0008551585,0.00027584002],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002374154,0.00027949878,0.11967741,0.0012035214,0.000107686166,0.0010539844,0.03325946,0.014398607,0.015037575,0.07531039,0.0019821161,0.7374524],"study_design_scores_gemma":[0.000046247835,0.0020424798,0.47208917,0.0047353404,0.000520687,0.007821845,0.07782507,0.076272205,0.03674059,0.1317379,0.18943024,0.0007382378],"about_ca_topic_score_codex":0.0017261124,"about_ca_topic_score_gemma":0.0023349337,"teacher_disagreement_score":0.006511731,"about_ca_system_score_codex":0.0019051913,"about_ca_system_score_gemma":0.0033973227,"threshold_uncertainty_score":0.034437776},"labels":[],"label_agreement":null},{"id":"W2548384983","doi":"","title":"VRML AS AN EFFECTIVE CONSTRUCTION COMMUNICATION TECHNIQUE","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"VRML; Computer science; Software; Virtual reality; Order (exchange); Multimedia; Software engineering; Human–computer interaction; Operating system","score_opus":0.00553185541560938,"score_gpt":0.21010346879746108,"score_spread":0.2045716133818517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2548384983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026385617,0.00019908058,0.987694,0.00016819128,0.00004605054,0.00010203925,0.000071416354,0.0018511659,0.0072293966],"genre_scores_gemma":[0.10003231,0.00069709145,0.8921027,0.00008702494,0.000042184813,0.0003971536,0.00030547375,0.000537245,0.0057987394],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99382186,0.003121387,0.00028080255,0.00032244687,0.0022939397,0.0001595272],"domain_scores_gemma":[0.99530065,0.0029400103,0.00028794757,0.0007915791,0.0006168347,0.00006296545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032201982,0.0009398207,0.00047080935,0.0017916971,0.00053119945,0.002730702,0.001781925,0.0012700061,0.0077222963],"category_scores_gemma":[0.008070407,0.00063003413,0.0006431401,0.0016845745,0.0014037398,0.0028309622,0.001852226,0.0011606783,0.0018344834],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002878911,0.00013899854,0.0005804066,0.0011322837,0.00006124746,0.00066100917,0.004714541,0.061147943,0.049077325,0.21160309,0.012885188,0.6577102],"study_design_scores_gemma":[0.00021862051,0.0005732981,0.0012915579,0.0005933508,0.00019780803,0.0025510418,0.0012725859,0.3033262,0.08492844,0.052898705,0.55189866,0.00024973723],"about_ca_topic_score_codex":0.0017962654,"about_ca_topic_score_gemma":0.001229109,"teacher_disagreement_score":0.0077222963,"about_ca_system_score_codex":0.0006770974,"about_ca_system_score_gemma":0.001032469,"threshold_uncertainty_score":0.025833607},"labels":[],"label_agreement":null},{"id":"W2550094450","doi":"","title":"De nouvelles plateformes pour améliorer la gestion de l'information sur le chantier","year":2016,"lang":"fr","type":"article","venue":"Espace École de technologie supérieure (École de technologie supérieure)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Mitacs","keywords":"Political science; Humanities; Art","score_opus":0.008816959619368481,"score_gpt":0.21157764424663042,"score_spread":0.20276068462726193,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550094450","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012294439,0.004305429,0.94266045,0.0016067316,0.0004589178,0.0005677901,0.00034048175,0.005198557,0.032567233],"genre_scores_gemma":[0.09719255,0.007836943,0.8174239,0.00081709045,0.00010628,0.00078221626,0.00093857484,0.0014649458,0.07343751],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99662966,0.0006928322,0.00020464452,0.0005942787,0.0016305067,0.00024815986],"domain_scores_gemma":[0.99367875,0.0018574356,0.000431559,0.0012949703,0.0025518537,0.00018541074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040035374,0.002581357,0.0009594854,0.0030232465,0.0018180487,0.005890706,0.0031499327,0.0031955284,0.028869458],"category_scores_gemma":[0.009130718,0.0014107414,0.0017356772,0.0025364393,0.0023537513,0.005008754,0.002639208,0.0025183249,0.012889064],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003384342,0.000297747,0.0026523164,0.0027033405,0.00012535599,0.0002769266,0.0024006548,0.028210783,0.059699222,0.033109874,0.015848259,0.85433704],"study_design_scores_gemma":[0.00017457978,0.0010888338,0.0093787955,0.0030783354,0.0004925628,0.001143622,0.004653226,0.20271756,0.14824817,0.02271236,0.60576993,0.0005420883],"about_ca_topic_score_codex":0.036424424,"about_ca_topic_score_gemma":0.04831519,"teacher_disagreement_score":0.036424424,"about_ca_system_score_codex":0.0024671461,"about_ca_system_score_gemma":0.004614754,"threshold_uncertainty_score":0.09657794},"labels":[],"label_agreement":null},{"id":"W2550258110","doi":"10.1139/tcsme-2013-0037","title":"AN EXPERIMENTAL STUDY ON THE CONNECTION OF CROSSBEAMS IN A MODULAR BRIDGE","year":2013,"lang":"en","type":"article","venue":"Transactions of the Canadian Society for Mechanical Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Bridge (graph theory); Structural engineering; Engineering; Computer science","score_opus":0.013298508714501141,"score_gpt":0.21641391997070594,"score_spread":0.2031154112562048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550258110","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99547845,0.000055100558,0.0032993404,0.000015285705,0.000038789603,0.0000391968,0.00006576391,0.000038206992,0.0009698642],"genre_scores_gemma":[0.99473935,0.00007392859,0.0034471226,0.000016936767,0.0000106490215,0.00004284526,0.0000854433,0.000008553817,0.0015751785],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992493,0.00009350176,0.000049888913,0.00019108951,0.0002600694,0.00015610231],"domain_scores_gemma":[0.9989097,0.000191573,0.00014960211,0.0002946474,0.00031544289,0.00013901218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007516999,0.0005683082,0.0003584515,0.00053349725,0.0005011908,0.0002623186,0.00070542167,0.0011094903,0.005174786],"category_scores_gemma":[0.00089863816,0.00039382518,0.0003585612,0.00036189717,0.0006489853,0.0007649536,0.0008008964,0.0005645983,0.0004889612],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00055570627,0.0009574837,0.0031985568,0.00012928786,0.000020066045,0.00045336247,0.00050558464,0.0037920175,0.9812338,0.00058662804,0.0001621726,0.008405319],"study_design_scores_gemma":[0.00017745198,0.025000362,0.04057898,0.00006048766,0.00011083818,0.0005640218,0.0010683301,0.026094986,0.9015405,0.00046623507,0.0042679957,0.00006986577],"about_ca_topic_score_codex":0.00042530583,"about_ca_topic_score_gemma":0.0006823074,"teacher_disagreement_score":0.005174786,"about_ca_system_score_codex":0.00014666031,"about_ca_system_score_gemma":0.00024443222,"threshold_uncertainty_score":0.017311394},"labels":[],"label_agreement":null},{"id":"W2550273880","doi":"10.1139/cjce-2014-0296","title":"Benchmark Alberta’s architectural, engineering, and construction industry knowledge of building information modelling (BIM)","year":2016,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Integrated project delivery; Benchmark (surveying); Globe; Construction industry; Building industry; Project management; Engineering management; Construction engineering; Engineering; Business; Systems engineering; Operations management","score_opus":0.005163455256950599,"score_gpt":0.1649396795862343,"score_spread":0.15977622432928368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550273880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8671554,0.00063656823,0.0014513442,0.0042812983,0.000025949314,0.0001597305,0.0010500036,0.000053382835,0.12518632],"genre_scores_gemma":[0.9867051,0.00058607006,0.0030813336,0.00039535368,0.0000070932197,0.000046180965,0.00068841566,0.000009448922,0.008481009],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99577373,0.0005232409,0.00014925169,0.00021045996,0.002617732,0.000725685],"domain_scores_gemma":[0.9905563,0.0021733686,0.0005796014,0.00031239985,0.004958097,0.0014203379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004073717,0.00015645217,0.00014625992,0.0024350525,0.0034177192,0.0031113399,0.00073753396,0.00055202044,0.004550477],"category_scores_gemma":[0.0080841845,0.00017667741,0.00009553555,0.0042131487,0.0021582453,0.0009904999,0.002002203,0.00063011615,0.0003829638],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021420253,0.00046171682,0.5358521,0.0006899495,0.000029464705,0.0010844418,0.11502209,0.0023526805,0.006306291,0.04349281,0.03385373,0.2606405],"study_design_scores_gemma":[0.000008914713,0.00012429521,0.7453956,0.00034828266,0.000019181201,0.00022049414,0.122471005,0.0021080892,0.0013291222,0.002228232,0.12569547,0.000051409064],"about_ca_topic_score_codex":0.90378237,"about_ca_topic_score_gemma":0.9598661,"teacher_disagreement_score":0.09621763,"about_ca_system_score_codex":0.03387411,"about_ca_system_score_gemma":0.04376787,"threshold_uncertainty_score":0.24577504},"labels":[],"label_agreement":null},{"id":"W2550837389","doi":"10.1002/9781119163404.app5a","title":"Synchro <scp>HARBORcenter</scp> Case Study","year":2016,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Synchro; Citation; Computer science; Library science; Engineering","score_opus":0.006846567101724657,"score_gpt":0.21924064554589237,"score_spread":0.21239407844416772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2550837389","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50144434,0.0005586815,0.08114589,0.004502923,0.00038490043,0.0019113894,0.0054331506,0.0019124433,0.40270633],"genre_scores_gemma":[0.8312874,0.0006161169,0.044394985,0.0005558975,0.000062051404,0.0010273807,0.0031668379,0.00064730743,0.11824216],"study_design_codex":"not_applicable","study_design_gemma":"case_report","domain_scores_codex":[0.99836296,0.00051834824,0.00008382271,0.00012751049,0.00065210665,0.0002553051],"domain_scores_gemma":[0.99819994,0.0005196598,0.00014023048,0.00021098662,0.00048986624,0.0004392806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013500275,0.0005669557,0.00029008507,0.00095800875,0.0023252578,0.0024266439,0.0016007478,0.0017875895,0.034390282],"category_scores_gemma":[0.0031068379,0.000348626,0.0004802384,0.0013399305,0.001185093,0.001918358,0.0019225121,0.0009879138,0.0051510856],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011577886,0.0023847166,0.04431261,0.0017225379,0.00008389432,0.059774734,0.017877199,0.09519429,0.012349038,0.123869315,0.3761101,0.2651638],"study_design_scores_gemma":[0.00018358359,0.0006941728,0.011176714,0.0005210633,0.000048135425,0.011177246,0.027317021,0.043030426,0.0100969,0.0114682205,0.88414633,0.00014022677],"about_ca_topic_score_codex":0.017144267,"about_ca_topic_score_gemma":0.033598926,"teacher_disagreement_score":0.034390282,"about_ca_system_score_codex":0.0024475663,"about_ca_system_score_gemma":0.0025615687,"threshold_uncertainty_score":0.11504692},"labels":[],"label_agreement":null},{"id":"W2559373721","doi":"10.1016/j.proeng.2016.11.591","title":"Comparing Time and Quantity Scales for Relationship and Float Calculations","year":2016,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Scale (ratio); Schedule; Point (geometry); Work (physics); Margin (machine learning); Computer science; Probabilistic logic; Industrial engineering; Section (typography); Mathematics; Engineering; Statistics; Geometry; Mechanical engineering; Physics","score_opus":0.015951286683706933,"score_gpt":0.20380093731705715,"score_spread":0.1878496506333502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2559373721","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043401886,0.0007796274,0.9112397,0.0006582339,0.0004699415,0.00025317256,0.00055561884,0.0017379572,0.040903937],"genre_scores_gemma":[0.38317356,0.00074327213,0.60747916,0.00016308535,0.0001577357,0.00047222772,0.00069465,0.0015334302,0.00558295],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98876816,0.0044186716,0.0008885742,0.00092044816,0.0046970886,0.00030696765],"domain_scores_gemma":[0.96269155,0.025174968,0.0022241517,0.0039014386,0.005578614,0.00042930522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009921662,0.0010398627,0.0006356997,0.0037023984,0.0007562073,0.004465049,0.0019429807,0.00070762646,0.009617724],"category_scores_gemma":[0.07478617,0.0005260006,0.0012789682,0.004419618,0.001239597,0.008208334,0.0025908167,0.0013333204,0.0019168375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047209754,0.00013865725,0.012382601,0.0005481778,0.00012002669,0.00016853292,0.0021611515,0.12683557,0.002252157,0.454314,0.00983809,0.390769],"study_design_scores_gemma":[0.00017650472,0.00035931237,0.014201292,0.00042287447,0.00015647282,0.00025413214,0.0021393062,0.70224077,0.010123068,0.17547008,0.09422466,0.00023163146],"about_ca_topic_score_codex":0.008692134,"about_ca_topic_score_gemma":0.0056115664,"teacher_disagreement_score":0.009921662,"about_ca_system_score_codex":0.0023470367,"about_ca_system_score_gemma":0.002009049,"threshold_uncertainty_score":0.05247134},"labels":[],"label_agreement":null},{"id":"W2563258340","doi":"","title":"TRA-901: OPTIMIZING THE LOCATION OF ROAD WEATHER INFORMATION SYSTEMS (RWIS) STATIONS – A SAMPLING DESIGN OPTIMIZATION APPROACH","year":2016,"lang":"en","type":"article","venue":"Scholarship@Western (Western University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Minnesota Department of Transportation; U.S. Department of Transportation","keywords":"Computer science; Sampling (signal processing); Telecommunications","score_opus":0.0715822363726277,"score_gpt":0.2553466699988335,"score_spread":0.1837644336262058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2563258340","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051524423,0.000120499964,0.94296116,0.0001264117,0.000015905382,0.00018665126,0.00009199795,0.00023586674,0.004737153],"genre_scores_gemma":[0.6221371,0.00013982126,0.37417522,0.00007050946,0.000019823856,0.0004786917,0.00020647065,0.00008252697,0.002689765],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918956,0.0004670384,0.00002664158,0.00010898573,0.00014453115,0.00006319984],"domain_scores_gemma":[0.99917114,0.00044399445,0.000115265415,0.000049989212,0.0001879824,0.000031604806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019775133,0.00086225936,0.00081451255,0.000797072,0.0003169091,0.0007400929,0.00090562727,0.0007132367,0.0018519291],"category_scores_gemma":[0.0027503385,0.000710517,0.00074759824,0.0005708712,0.00051640766,0.000626521,0.0006066542,0.00061331637,0.000265182],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030952695,0.000036293128,0.0005241939,0.000033497417,0.000021783178,0.000009040315,0.000017270278,0.98472995,0.0008977574,0.0011891143,0.00012552964,0.012384659],"study_design_scores_gemma":[0.000012228226,0.00007874507,0.00020742387,0.000004776911,0.00000994511,0.0000054922216,0.000011164474,0.9983222,0.0005867436,0.0003693714,0.0003887253,0.0000031065042],"about_ca_topic_score_codex":0.0076536383,"about_ca_topic_score_gemma":0.010180343,"teacher_disagreement_score":0.0076536383,"about_ca_system_score_codex":0.0011696662,"about_ca_system_score_gemma":0.0022138015,"threshold_uncertainty_score":0.015218139},"labels":[],"label_agreement":null},{"id":"W2565304470","doi":"10.1108/ohi-01-2016-b0011","title":"The Dry Construction Systems on the Rehabilitation of Built Heritage","year":2016,"lang":"en","type":"article","venue":"Open House International","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Context (archaeology); Quality (philosophy); Architectural engineering; Work (physics); Process (computing); Engineering; Economic shortage; Production (economics); Factory (object-oriented programming); Civil engineering; Computer science; Economics; Geography; Mechanical engineering; Government (linguistics)","score_opus":0.011710797556409264,"score_gpt":0.23156203457388497,"score_spread":0.2198512370174757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565304470","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14348505,0.0113012595,0.11756745,0.0043540294,0.00042636515,0.0005817088,0.00019347797,0.0005460033,0.72154456],"genre_scores_gemma":[0.8193561,0.007271494,0.07409288,0.00070488994,0.00013208439,0.00027269623,0.00013626173,0.00016610109,0.09786745],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988424,0.0005112404,0.00003843307,0.000118133634,0.00037114287,0.00011860765],"domain_scores_gemma":[0.99952066,0.00020244179,0.00006657975,0.000088342065,0.000069649715,0.000052243944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093542284,0.00042067425,0.00017647687,0.0017000191,0.0017185492,0.0032507232,0.00072909676,0.0006185212,0.011042267],"category_scores_gemma":[0.0012578514,0.00015805161,0.00029339184,0.0014443892,0.003764171,0.001759446,0.0040192986,0.0006352817,0.001306562],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011645116,0.00020188364,0.0042098905,0.0010938151,0.000022076714,0.00068180327,0.023724414,0.0028089925,0.0076767667,0.3869774,0.013263505,0.55922294],"study_design_scores_gemma":[0.00002586687,0.00030424565,0.017129418,0.0012383625,0.000039193143,0.0010328997,0.01992488,0.0027858762,0.006293607,0.05268226,0.8984947,0.00004880541],"about_ca_topic_score_codex":0.0032137414,"about_ca_topic_score_gemma":0.007087172,"teacher_disagreement_score":0.011042267,"about_ca_system_score_codex":0.0022888072,"about_ca_system_score_gemma":0.001990422,"threshold_uncertainty_score":0.03694004},"labels":[],"label_agreement":null},{"id":"W2565347129","doi":"10.1016/j.enbuild.2016.12.030","title":"An integrated simulation and optimization approach for reducing CO 2 emissions from on-site construction process in cold regions","year":2016,"lang":"en","type":"article","venue":"Energy and Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Northern Alberta Institute of Technology; University of Alberta","funders":"","keywords":"Greenhouse gas; Process (computing); Crew; Volume (thermodynamics); Genetic algorithm; Engineering; Discrete event simulation; Environmental science; Environmental economics; Computer science; Simulation; Economics","score_opus":0.009395779470427457,"score_gpt":0.2310339135814912,"score_spread":0.22163813411106373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565347129","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45411655,0.00027649177,0.5186207,0.00039387264,0.00011931215,0.00015666096,0.00025516743,0.0007603024,0.025300883],"genre_scores_gemma":[0.96723896,0.000084899984,0.030247206,0.000040065304,0.000013094773,0.00008551431,0.00009726603,0.00005184628,0.0021410866],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997334,0.00010606065,0.000009287145,0.000036652913,0.00005406122,0.000060438168],"domain_scores_gemma":[0.99972016,0.00013298535,0.000026828895,0.000020442878,0.00006698163,0.000032656724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050287927,0.0008886504,0.0013210828,0.0006731122,0.00078949454,0.0011389913,0.001176143,0.0013884591,0.0021569068],"category_scores_gemma":[0.00067570794,0.0007676727,0.0012045221,0.00065549853,0.00050571654,0.0007170212,0.0009351185,0.0007933529,0.0001607664],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021050231,0.000036003377,0.00022329298,0.00000505062,0.000009086531,0.000012050527,0.0000063557495,0.99749655,0.0003548704,0.00033367414,0.0000373546,0.0014647264],"study_design_scores_gemma":[0.000004079104,0.0000090989815,0.00006928683,7.6231925e-7,0.0000036228057,0.0000012735098,0.00000502082,0.9996019,0.00013473438,0.00011954906,0.000049153503,0.00000162634],"about_ca_topic_score_codex":0.03937583,"about_ca_topic_score_gemma":0.027772807,"teacher_disagreement_score":0.03937583,"about_ca_system_score_codex":0.0010935267,"about_ca_system_score_gemma":0.0020153557,"threshold_uncertainty_score":0.07829332},"labels":[],"label_agreement":null},{"id":"W2565626477","doi":"10.1139/cjce-2011-0486","title":"Performance de la conception intégrée et intégration des technologies de l’information dans un contexte de travail multidisciplinaire: une étude exploratoire","year":2016,"lang":"fr","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"","keywords":"Humanities; Sociology; Political science; Library science; Philosophy; Computer science","score_opus":0.005752845379904197,"score_gpt":0.19052169185706858,"score_spread":0.18476884647716438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2565626477","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79483354,0.0083494745,0.07084635,0.005507619,0.00010754258,0.00044556634,0.00027993027,0.00022743244,0.11940254],"genre_scores_gemma":[0.97088045,0.002826501,0.020451628,0.00014432616,0.000024720368,0.00017517175,0.00011478845,0.00005972152,0.005322718],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.97982615,0.009466395,0.0006253904,0.0013887773,0.0074696434,0.0012236797],"domain_scores_gemma":[0.96287584,0.023510378,0.0027181725,0.002448324,0.0075065964,0.0009406775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019875739,0.0008270871,0.0007870972,0.0031802154,0.002697832,0.016943125,0.0014101295,0.0023283903,0.003961585],"category_scores_gemma":[0.035855547,0.0005296332,0.0009076318,0.0055035115,0.0048637576,0.01038211,0.005159376,0.002213259,0.0008659567],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058461487,0.00081916497,0.061279144,0.004277011,0.00037784828,0.00091410737,0.19725013,0.028713139,0.017672395,0.21232502,0.004016112,0.47177136],"study_design_scores_gemma":[0.00012840766,0.0030109799,0.1500237,0.0068162805,0.0009313448,0.0016563423,0.37052897,0.081729025,0.053490717,0.10042341,0.23075102,0.00050980947],"about_ca_topic_score_codex":0.021681588,"about_ca_topic_score_gemma":0.012829262,"teacher_disagreement_score":0.021681588,"about_ca_system_score_codex":0.010524711,"about_ca_system_score_gemma":0.010029584,"threshold_uncertainty_score":0.10511416},"labels":[],"label_agreement":null},{"id":"W2566200771","doi":"","title":"Proceedings of the 3rd ISPIM Innovation Symposium, Quebec City (Canada)","year":2010,"lang":"en","type":"article","venue":"University of Groningen research database (University of Groningen / Centre for Information Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Regional science; Political science; Geography","score_opus":0.009377677039245129,"score_gpt":0.1910542774848882,"score_spread":0.18167660044564307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2566200771","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05469303,0.037335776,0.02347514,0.048989836,0.023221802,0.000711261,0.020472527,0.0017772252,0.7893234],"genre_scores_gemma":[0.03685052,0.0053280457,0.0063481233,0.00062577653,0.00034703402,0.000066104054,0.0038174815,0.0002939902,0.946323],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987043,0.00011899183,0.000031020718,0.00012683682,0.0007661454,0.00025265876],"domain_scores_gemma":[0.9979766,0.00009554705,0.000027749827,0.000075286254,0.0015139164,0.0003109845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026758309,0.0010343322,0.00085028127,0.0014591904,0.0040107616,0.006923649,0.0013801568,0.001864139,0.13110489],"category_scores_gemma":[0.0016005763,0.00052268995,0.00078884,0.0026014538,0.0012945882,0.0011265395,0.0015644536,0.0013455541,0.022512747],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022725978,0.00012014311,0.0038238415,0.00017686187,0.000039043312,0.00021512073,0.00058031187,0.0011371667,0.0015109068,0.0044656447,0.84900635,0.13869733],"study_design_scores_gemma":[0.000023028746,0.00003845241,0.010593375,0.00013804866,0.000038745864,0.000065137094,0.0009074661,0.0012162304,0.0011131954,0.0006644944,0.98516417,0.000037636604],"about_ca_topic_score_codex":0.9193193,"about_ca_topic_score_gemma":0.97255003,"teacher_disagreement_score":0.13110489,"about_ca_system_score_codex":0.018700225,"about_ca_system_score_gemma":0.036768723,"threshold_uncertainty_score":0.4385895},"labels":[],"label_agreement":null},{"id":"W2567106578","doi":"","title":"STR-999: INTELLIGENT MONITORING SYSTEM REVEALS NEW INFORMATION ABOUT THE CHAMPLAIN BRIDGE","year":2016,"lang":"en","type":"article","venue":"Scholarship@Western (Western University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Computer science; Forensic engineering; Engineering","score_opus":0.06440425078136475,"score_gpt":0.26983076977481496,"score_spread":0.2054265189934502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2567106578","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59166664,0.00069255335,0.114798374,0.00089383166,0.0003575514,0.00056439906,0.06018648,0.15366852,0.07717173],"genre_scores_gemma":[0.8522745,0.0002837998,0.055570222,0.00045132198,0.00011699655,0.00031666705,0.04802462,0.001165406,0.04179644],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995376,0.000026332882,0.000028513938,0.00014022691,0.0002174766,0.000049925824],"domain_scores_gemma":[0.9996158,0.0000339166,0.000044827248,0.000049965885,0.00019903992,0.000056435798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004219631,0.00078945776,0.00058816856,0.0028292884,0.00036536722,0.00095646473,0.00068354566,0.00073597394,0.011968172],"category_scores_gemma":[0.0007720657,0.0002067189,0.00019036522,0.0010126734,0.0001566053,0.00085138914,0.000789064,0.00041179665,0.0059327087],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028501272,0.00079803774,0.083501495,0.00046292454,0.0001854241,0.0019390341,0.0011325255,0.010194133,0.15666574,0.0025295247,0.24582884,0.49391222],"study_design_scores_gemma":[0.0002473288,0.00095526193,0.20904586,0.00020056556,0.00018095222,0.0014932988,0.0007767684,0.48347604,0.14666086,0.0025615934,0.15411757,0.0002839054],"about_ca_topic_score_codex":0.007879949,"about_ca_topic_score_gemma":0.014156565,"teacher_disagreement_score":0.011968172,"about_ca_system_score_codex":0.00042183098,"about_ca_system_score_gemma":0.00048389175,"threshold_uncertainty_score":0.040037513},"labels":[],"label_agreement":null},{"id":"W2573050985","doi":"10.1609/socs.v7i1.18385","title":"A Multi-Phase Search Approach to the LEGO Construction Problem","year":2021,"lang":"en","type":"article","venue":"Proceedings of the International Symposium on Combinatorial Search","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Heuristics; Component (thermodynamics); Computer science; Construct (python library); Search problem; Task (project management); Search algorithm; Connected component; Brick; Selection (genetic algorithm); Beam search; Local search (optimization); Phase (matter); Mathematical optimization; Algorithm; Artificial intelligence; Mathematics; Engineering","score_opus":0.017194737550558642,"score_gpt":0.2538083237308843,"score_spread":0.23661358618032566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2573050985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012509147,0.00030061914,0.97862214,0.0004193253,0.00003489517,0.00020688403,0.000099328536,0.00020494992,0.0076028695],"genre_scores_gemma":[0.16748242,0.0004118086,0.8247681,0.00021450073,0.000036382262,0.0005440954,0.0002797697,0.00012399396,0.006138887],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99899966,0.0005178346,0.000035862944,0.0001362233,0.00021513579,0.00009537912],"domain_scores_gemma":[0.99871767,0.00095405633,0.00007317094,0.000081171,0.000112940084,0.000060954848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015525876,0.0011338973,0.0013211311,0.001749707,0.0011373417,0.0015281666,0.0022835135,0.0021074915,0.008150006],"category_scores_gemma":[0.0033150387,0.0008163712,0.0013965494,0.001708897,0.0014253679,0.0021612328,0.0019214968,0.0013837314,0.00074604433],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001267452,0.00020995349,0.00065193797,0.00022851763,0.00007088752,0.00017333252,0.00015538243,0.82778144,0.0019274383,0.08932042,0.003260475,0.07609346],"study_design_scores_gemma":[0.00007352996,0.000120275516,0.00012955617,0.000028543647,0.000021754535,0.000091969705,0.00007292853,0.9482819,0.00058904727,0.046440348,0.004130538,0.000019621486],"about_ca_topic_score_codex":0.002858439,"about_ca_topic_score_gemma":0.004778103,"teacher_disagreement_score":0.008150006,"about_ca_system_score_codex":0.0013231302,"about_ca_system_score_gemma":0.0020205353,"threshold_uncertainty_score":0.027264476},"labels":[],"label_agreement":null},{"id":"W2573273784","doi":"","title":"Innovative Design, Traffic Management and Construction of Concrete Overlay Technology: A Canadian Municipal Application","year":2016,"lang":"en","type":"article","venue":"Transportation Research Board 95th Annual Meeting","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Overlay; Transport engineering; Construction engineering; Engineering; Computer science; Civil engineering","score_opus":0.016469053633928695,"score_gpt":0.26480497986613133,"score_spread":0.24833592623220263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2573273784","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75496995,0.002001008,0.056654163,0.0022641881,0.000086176355,0.00058335956,0.0005809961,0.0008052796,0.18205486],"genre_scores_gemma":[0.9092179,0.002057224,0.058766555,0.00006058192,0.000008194532,0.00009090426,0.00022007823,0.000075688265,0.029502865],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99885345,0.00012895204,0.00002203832,0.000089913294,0.00070437,0.00020128764],"domain_scores_gemma":[0.99950063,0.00006163313,0.000025680483,0.000052976764,0.00028950616,0.00006948174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009865218,0.0006448458,0.00032269422,0.0011508458,0.0038384267,0.003134353,0.0012585884,0.0009192664,0.004067688],"category_scores_gemma":[0.0015051169,0.0002808438,0.0003956327,0.0031496584,0.0013383873,0.00087102246,0.0013445466,0.00054044387,0.0003964259],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040335231,0.00097084785,0.024983894,0.00073020457,0.00007056059,0.000974084,0.008666691,0.11701396,0.059557956,0.11631835,0.014900836,0.6554093],"study_design_scores_gemma":[0.00020281336,0.0016358367,0.1312964,0.0004113962,0.0005680522,0.0013243424,0.034676544,0.29219192,0.057712466,0.030367337,0.44921535,0.00039756368],"about_ca_topic_score_codex":0.8351275,"about_ca_topic_score_gemma":0.9418008,"teacher_disagreement_score":0.16487253,"about_ca_system_score_codex":0.021739855,"about_ca_system_score_gemma":0.038474966,"threshold_uncertainty_score":0.33168697},"labels":[],"label_agreement":null},{"id":"W2574160338","doi":"10.7492/ijaec.2016.013","title":"Functional Units based Model for Construction Organizations Performance","year":2016,"lang":"en","type":"article","venue":"International Journal of Architecture Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Process management; Computer science; Knowledge management","score_opus":0.005417452169990675,"score_gpt":0.1712415511934854,"score_spread":0.1658240990234947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2574160338","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15130627,0.00035226165,0.7450912,0.0014648896,0.00016484456,0.00023330028,0.0009681545,0.0009981842,0.09942092],"genre_scores_gemma":[0.96428406,0.00013744477,0.023030665,0.000055455654,0.000027340506,0.00028909527,0.000343446,0.000046160894,0.011786204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990068,0.00037769123,0.000043151365,0.0001461285,0.0002540712,0.00017223005],"domain_scores_gemma":[0.99896765,0.00044634895,0.000102631915,0.000094904346,0.0003213207,0.00006710166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013476941,0.0009181026,0.00050353544,0.001571075,0.00050047226,0.0018287845,0.0019975072,0.001665786,0.012885746],"category_scores_gemma":[0.002922912,0.0002614589,0.00078648835,0.0013036602,0.00063736155,0.002571608,0.0009713975,0.00084952975,0.002331688],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001020873,0.0001760361,0.0024736037,0.00007320062,0.000066819084,0.000091588954,0.00022338654,0.85006267,0.0009303447,0.119258516,0.002269797,0.024272049],"study_design_scores_gemma":[0.000007950427,0.00005178736,0.00065633515,0.000012029174,0.000016064761,0.000014748366,0.000082269034,0.97777265,0.00016887546,0.020249464,0.0009589827,0.000008881887],"about_ca_topic_score_codex":0.0066399802,"about_ca_topic_score_gemma":0.0040954147,"teacher_disagreement_score":0.012885746,"about_ca_system_score_codex":0.002080639,"about_ca_system_score_gemma":0.0012140729,"threshold_uncertainty_score":0.043107152},"labels":[],"label_agreement":null},{"id":"W2575656890","doi":"10.5555/3042094.3042502","title":"A prototype for simulating the kinematics of crane rigging oscillatory motion using Simphony.NET","year":2016,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Kinematics; Computer science; Virtual prototyping; Automation; Motion (physics); Simulation; Perspective (graphical); Double pendulum; Work (physics); Scope (computer science); Equations of motion; Motion control; Pendulum; Control engineering; Inverted pendulum; Engineering; Mechanical engineering; Artificial intelligence; Programming language","score_opus":0.03841010037464632,"score_gpt":0.27195150130117324,"score_spread":0.23354140092652692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2575656890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17188105,0.00016207823,0.7695564,0.0002437072,0.00028757026,0.00072401343,0.0017358011,0.020646714,0.034762785],"genre_scores_gemma":[0.7328812,0.00021561164,0.25261417,0.00009969349,0.0000144747,0.0007845442,0.0011978167,0.0013725915,0.010819898],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99982363,0.000038546554,0.00001123247,0.000025041967,0.00007585719,0.000025754229],"domain_scores_gemma":[0.9996345,0.0001913788,0.000021356556,0.000049433555,0.0000645426,0.000038738246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00063946686,0.00053822383,0.00036484495,0.00037388934,0.0002635208,0.0005670951,0.0017624426,0.0007341275,0.016411683],"category_scores_gemma":[0.00096003816,0.000369426,0.0005137843,0.0002463935,0.0005104776,0.00056573085,0.0006571988,0.0006157825,0.0011617175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007139137,0.00044118476,0.005784309,0.00085541396,0.000080817015,0.0005986357,0.0007465234,0.82991016,0.051834133,0.015344057,0.007813325,0.085877545],"study_design_scores_gemma":[0.00012977397,0.00019387467,0.0008185339,0.00004751932,0.000021257429,0.000102719685,0.000088026776,0.9671154,0.0143196415,0.0016942583,0.015441964,0.00002709445],"about_ca_topic_score_codex":0.0031794067,"about_ca_topic_score_gemma":0.0038041635,"teacher_disagreement_score":0.016411683,"about_ca_system_score_codex":0.00047116316,"about_ca_system_score_gemma":0.0008406811,"threshold_uncertainty_score":0.054902554},"labels":[],"label_agreement":null},{"id":"W2579284964","doi":"10.5555/3042094.3042501","title":"Heavy lift analysis at feed stage for industrial project","year":2016,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Modular design; Automation; Lift (data mining); Prefabrication; Project planning; Engineering; Project management; Systems engineering; Computer science; Construction engineering; Civil engineering","score_opus":0.06340274180476257,"score_gpt":0.283105620664349,"score_spread":0.21970287885958645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2579284964","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.678189,0.000082494145,0.27629083,0.000114017384,0.000029669101,0.00020468168,0.0025014204,0.0024516808,0.040136103],"genre_scores_gemma":[0.93109196,0.00006403946,0.060031053,0.000012681101,0.0000031928098,0.00007974234,0.001434803,0.00018150856,0.007100979],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998197,0.000014081419,0.000005609824,0.000020627287,0.00010551823,0.000034510285],"domain_scores_gemma":[0.99977976,0.00005448163,0.000017282871,0.000019842519,0.000111616035,0.000016966056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025494612,0.00038461256,0.0002941966,0.0014311117,0.0005782529,0.0010274593,0.0004248682,0.00043336023,0.009962177],"category_scores_gemma":[0.0005728888,0.0003350108,0.0003415354,0.0011487938,0.00021439268,0.0003673904,0.0004139239,0.00033492455,0.0009429514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035688668,0.00020149372,0.041621014,0.00014559003,0.000020787287,0.00050747656,0.0004047544,0.75674325,0.048506558,0.0064542806,0.0042543327,0.14078353],"study_design_scores_gemma":[0.000008959429,0.00004658148,0.010565632,0.000008435151,0.000006264014,0.000029279503,0.00016620113,0.9759325,0.0096443,0.00092834735,0.002645955,0.000017472506],"about_ca_topic_score_codex":0.03910044,"about_ca_topic_score_gemma":0.04799103,"teacher_disagreement_score":0.03910044,"about_ca_system_score_codex":0.00094409357,"about_ca_system_score_gemma":0.0015325821,"threshold_uncertainty_score":0.077745676},"labels":[],"label_agreement":null},{"id":"W2581170436","doi":"10.18260/1-2--21021","title":"BIMing Construction Engineering Curricula","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"AUG Signals (Canada)","funders":"","keywords":"Software engineering; Building information modeling; Software; Construction management; Engineering; Engineering management; Suite; Curriculum; Computer science; Construction engineering; Scheduling (production processes); Civil engineering; Operations management","score_opus":0.007012835131492153,"score_gpt":0.16595389797483054,"score_spread":0.1589410628433384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2581170436","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17813745,0.005063418,0.11249528,0.036306925,0.0029018754,0.0009878002,0.0019118689,0.00545326,0.6567421],"genre_scores_gemma":[0.5548249,0.005761018,0.26449737,0.0025144764,0.0006466673,0.0007196463,0.0033461954,0.0011485271,0.16654119],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99590695,0.0013357325,0.00024130577,0.00038795944,0.0016857632,0.00044226824],"domain_scores_gemma":[0.9904383,0.0017018993,0.0009584808,0.0014367434,0.0035200901,0.0019444308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005653686,0.0006468876,0.00034905737,0.0046642325,0.0022078615,0.0062628267,0.0016051664,0.0007988887,0.0538975],"category_scores_gemma":[0.013004923,0.00038036722,0.00038346212,0.0038189269,0.0010559035,0.003846859,0.0063497643,0.0012061094,0.010217967],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039232273,0.0004349304,0.01012194,0.00028091692,0.000004904223,0.0000853015,0.0020533707,0.0040992484,0.0013092592,0.039636847,0.057701293,0.8842328],"study_design_scores_gemma":[0.000021697253,0.00014639663,0.016016811,0.0010508911,0.000010519971,0.00011314748,0.008243037,0.011090358,0.0049206433,0.031737298,0.9266007,0.00004839186],"about_ca_topic_score_codex":0.0056854216,"about_ca_topic_score_gemma":0.011627402,"teacher_disagreement_score":0.0538975,"about_ca_system_score_codex":0.0053470233,"about_ca_system_score_gemma":0.010896786,"threshold_uncertainty_score":0.18030512},"labels":[],"label_agreement":null},{"id":"W2583128632","doi":"","title":"Editorial - Technology Strategies for Collaborative Working","year":2010,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interoperability; Context (archaeology); Productivity; Workforce; Business; Information and Communications Technology; Knowledge management; Best practice; Engineering; Process management; Engineering management; Management; Political science; Economic growth; Computer science; Economics","score_opus":0.003260751857332548,"score_gpt":0.21704751225111155,"score_spread":0.213786760393779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2583128632","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000030626736,0.0065609403,0.00011578235,0.032586116,0.9581465,0.000010203923,0.000018114533,0.000021643318,0.0025100969],"genre_scores_gemma":[0.0009963199,0.009975342,0.00014423428,0.020058254,0.9570874,0.000023605946,0.000029429502,0.000033386626,0.011651944],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9944834,0.0009466128,0.00071156304,0.0006110005,0.0028899948,0.00035735458],"domain_scores_gemma":[0.98081183,0.008685587,0.0009653409,0.0006090001,0.0066921306,0.0022361758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005102478,0.003145517,0.0018037742,0.0034205331,0.0035182172,0.009713139,0.0034353684,0.014952604,0.013983822],"category_scores_gemma":[0.022536349,0.00062907056,0.0018465874,0.0017703857,0.0037180914,0.008156846,0.0020100551,0.015232991,0.009300553],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016028425,0.000010707447,0.000015776493,0.00020589946,0.000005555146,0.000092732815,0.000030084784,0.00003231803,0.000039249968,0.0012374,0.99244267,0.0058716726],"study_design_scores_gemma":[0.000015923028,0.000013319613,0.000092849456,0.00033520666,0.000010934921,0.00018939286,0.00007190009,0.000067330424,0.000047266192,0.0017552873,0.9973929,0.000007672986],"about_ca_topic_score_codex":0.0013861503,"about_ca_topic_score_gemma":0.002891215,"teacher_disagreement_score":0.014952604,"about_ca_system_score_codex":0.0042956476,"about_ca_system_score_gemma":0.0038774752,"threshold_uncertainty_score":0.046780527},"labels":[],"label_agreement":null},{"id":"W2585603905","doi":"10.5430/jms.v8n1p1","title":"Impact Analysis of Complexity Drivers in the Supply Chain of Prefabricated Houses","year":2017,"lang":"en","type":"article","venue":"Journal of Management and Strategy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Status quo; Supply chain; Modular design; Production (economics); Order (exchange); Business; Exploit; Prefabrication; Supply chain management; Industrial organization; Value (mathematics); Operations management; Risk analysis (engineering); Engineering; Computer science; Marketing; Civil engineering; Economics; Economic growth","score_opus":0.030101478397203934,"score_gpt":0.2690674120083419,"score_spread":0.23896593361113797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2585603905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99411196,0.000095346026,0.0015609899,0.000072375406,0.0000068416857,0.000069159294,0.00012371353,0.000010335406,0.0039492687],"genre_scores_gemma":[0.99863666,0.00009080089,0.000547483,0.0000042391666,0.0000022459528,0.000018225239,0.00012433447,0.000002946559,0.0005730805],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99812526,0.0006807585,0.000061534345,0.000109323686,0.0006630807,0.00036007233],"domain_scores_gemma":[0.992342,0.0040810495,0.000956946,0.00020496779,0.0017777716,0.0006373434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021625813,0.00059216394,0.0003530313,0.0024753567,0.00077744224,0.0024412037,0.0004233812,0.0005317671,0.006387449],"category_scores_gemma":[0.0057851397,0.00025113652,0.0010246738,0.002600588,0.000631436,0.002063526,0.0015522963,0.0006381983,0.000373045],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015913096,0.0009873497,0.81698865,0.0005137042,0.0005520816,0.0013126244,0.0023446435,0.093205616,0.007022583,0.01524311,0.00072394736,0.059514392],"study_design_scores_gemma":[0.000052506104,0.002162353,0.8088867,0.00020213593,0.00060243806,0.0002497079,0.017192721,0.15343274,0.0064838184,0.005973093,0.0046558264,0.00010588645],"about_ca_topic_score_codex":0.010623157,"about_ca_topic_score_gemma":0.011202148,"teacher_disagreement_score":0.010623157,"about_ca_system_score_codex":0.0026204586,"about_ca_system_score_gemma":0.0021229691,"threshold_uncertainty_score":0.021368146},"labels":[],"label_agreement":null},{"id":"W2586320347","doi":"10.4018/ij3dim.2016070102","title":"A Comparative Analysis of the Complexities of Building Information Model(ling) Guides to Support Standardization","year":2016,"lang":"en","type":"article","venue":"International Journal of 3-D Information Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Public Works and Government Services Canada","funders":"","keywords":"Standardization; Scope (computer science); Leverage (statistics); Computer science; Process (computing); Building information modeling; Knowledge management; Context (archaeology); Process management; Engineering management; Data science; World Wide Web; Engineering; Compatibility (geochemistry)","score_opus":0.024272861912765547,"score_gpt":0.28059501771770506,"score_spread":0.2563221558049395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2586320347","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47448435,0.005553815,0.19181548,0.011275827,0.0003141556,0.0046065496,0.0007708172,0.0026612221,0.30851778],"genre_scores_gemma":[0.6440002,0.00337245,0.3315558,0.0012835244,0.000061842926,0.0017433191,0.0015324332,0.0009461815,0.015504061],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.872144,0.07183922,0.008278447,0.0022849385,0.041885484,0.0035679566],"domain_scores_gemma":[0.58798003,0.3002308,0.012993344,0.026384324,0.068430685,0.003980794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.1321905,0.0007168958,0.00097227853,0.012396399,0.0034674676,0.015910102,0.0038417592,0.002886246,0.0064007603],"category_scores_gemma":[0.2788715,0.0014313066,0.0015209747,0.011943485,0.005784435,0.01676053,0.008804395,0.0027441487,0.001281709],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007912111,0.00062837463,0.03497722,0.002810166,0.00013771221,0.0014515341,0.09443079,0.009840865,0.0022838758,0.3605054,0.014156557,0.47798625],"study_design_scores_gemma":[0.0003415713,0.0015901192,0.06266099,0.009817437,0.0005765833,0.0028567223,0.13940562,0.049083896,0.00971728,0.10073793,0.62266797,0.0005439966],"about_ca_topic_score_codex":0.014048236,"about_ca_topic_score_gemma":0.023215694,"teacher_disagreement_score":0.1321905,"about_ca_system_score_codex":0.012324126,"about_ca_system_score_gemma":0.024568196,"threshold_uncertainty_score":0.6990985},"labels":[],"label_agreement":null},{"id":"W2586320484","doi":"10.22260/isarc2013/0035","title":"BIM for Facility Management: Design for Maintainability with BIM Tools","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maintainability; Facility management; Building information modeling; Software; Systems engineering; Computer science; Engineering management; Engineering; Software engineering; Operations management; Business; Operating system","score_opus":0.016923488167238484,"score_gpt":0.19768131257478844,"score_spread":0.18075782440754995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2586320484","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015725229,0.0008239388,0.9778566,0.000844034,0.00016567737,0.00021782737,0.00024604276,0.0015484195,0.016724931],"genre_scores_gemma":[0.034503765,0.0013438041,0.95309126,0.0002025581,0.000083315164,0.0006173236,0.0009736527,0.00080179056,0.008382381],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99575174,0.0014498949,0.00035218257,0.00026719406,0.0019833418,0.00019563253],"domain_scores_gemma":[0.997431,0.00064303604,0.00019937327,0.00041705888,0.0011507986,0.00015879149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052045267,0.001138482,0.0006307037,0.003072605,0.0010489933,0.004841353,0.0033206441,0.0018222088,0.010120457],"category_scores_gemma":[0.0070481338,0.0011006084,0.001777443,0.0024534576,0.0019383683,0.003859715,0.003994873,0.0021939382,0.005105313],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000084981744,0.00011771214,0.0015301509,0.001654808,0.000119257675,0.00051647937,0.0022905425,0.0498519,0.011202681,0.41957486,0.042396285,0.47066033],"study_design_scores_gemma":[0.000040384886,0.00012752255,0.0011988966,0.0008338345,0.00010698149,0.0010058242,0.00075375295,0.08371616,0.0073101716,0.09687501,0.80792326,0.00010826248],"about_ca_topic_score_codex":0.002457971,"about_ca_topic_score_gemma":0.0018483477,"teacher_disagreement_score":0.010120457,"about_ca_system_score_codex":0.0013227636,"about_ca_system_score_gemma":0.0024020234,"threshold_uncertainty_score":0.033856273},"labels":[],"label_agreement":null},{"id":"W2589032174","doi":"10.1109/nafips.2016.7851610","title":"Overview of fuzzy simulation techniques in construction engineering and management","year":2016,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Fuzzy logic; Systems engineering; Construction engineering; Engineering; Artificial intelligence","score_opus":0.011327619986843456,"score_gpt":0.22511272574249858,"score_spread":0.21378510575565512,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2589032174","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022452613,0.015647812,0.9564155,0.00065534253,0.00012134359,0.00009492883,0.00010296873,0.00024206088,0.024474869],"genre_scores_gemma":[0.12441411,0.054057695,0.8091753,0.00027719312,0.0003463236,0.0003418885,0.0003846354,0.00010916705,0.010893737],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99890816,0.0003714474,0.0001145743,0.00012350733,0.00043571292,0.000046582987],"domain_scores_gemma":[0.99929607,0.00040618883,0.000050217666,0.00007173934,0.00015419954,0.000021512873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015861501,0.0008698377,0.00072742486,0.002549874,0.00075320277,0.0018154278,0.0012122766,0.0012324196,0.004428443],"category_scores_gemma":[0.0014295508,0.0005883634,0.0013981548,0.0027521348,0.0009944893,0.0019032358,0.001018202,0.0013718199,0.001067163],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032848755,0.0000725925,0.0007367687,0.000838832,0.00009581873,0.00017963699,0.0004246136,0.14505742,0.0028371408,0.6116005,0.0036098317,0.23451397],"study_design_scores_gemma":[0.000021674556,0.00009037803,0.00079347886,0.00081368856,0.00006815173,0.00043472444,0.00019245245,0.34966558,0.004226136,0.3715165,0.2720915,0.00008562641],"about_ca_topic_score_codex":0.00484503,"about_ca_topic_score_gemma":0.0032589717,"teacher_disagreement_score":0.00484503,"about_ca_system_score_codex":0.0017199477,"about_ca_system_score_gemma":0.0013189851,"threshold_uncertainty_score":0.014814615},"labels":[],"label_agreement":null},{"id":"W2590775636","doi":"10.1061/(asce)cp.1943-5487.0000660","title":"Automated Schedule and Progress Updating of IFC-Based 4D BIMs","year":2017,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":101,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Computer science; Schedule; Exploit; Field (mathematics); Task (project management); Hierarchy; Systems engineering; Data mining; Scheduling (production processes); Engineering","score_opus":0.007272320727445325,"score_gpt":0.23239998591886832,"score_spread":0.225127665191423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2590775636","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07899791,0.00013595686,0.85532707,0.00015962886,0.00012387574,0.00033870348,0.0036094328,0.051351856,0.009955643],"genre_scores_gemma":[0.33945403,0.00018863747,0.64746517,0.000060000537,0.000032725366,0.0003001252,0.006969657,0.0021946544,0.0033350457],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998473,0.00012862675,0.00009220653,0.00030258973,0.00090255827,0.00010093854],"domain_scores_gemma":[0.99733424,0.00043839467,0.00039396976,0.0007384377,0.00097048865,0.00012439703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013127964,0.0011871266,0.0009859091,0.005895756,0.0005985812,0.0015618756,0.0017007759,0.00047358093,0.004393623],"category_scores_gemma":[0.0055283103,0.00072292937,0.0005730759,0.0030985156,0.00043214983,0.0015179226,0.0017293239,0.0006879475,0.0027078616],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004105845,0.0002491853,0.01772906,0.0002819517,0.00006810502,0.00028012836,0.0013667649,0.061950002,0.027948843,0.007257712,0.015307077,0.8671505],"study_design_scores_gemma":[0.000040850053,0.0000872816,0.012242741,0.000058442336,0.000044237688,0.00024140881,0.0005162978,0.89069074,0.051990177,0.0053838473,0.038592037,0.00011201229],"about_ca_topic_score_codex":0.009675026,"about_ca_topic_score_gemma":0.012288569,"teacher_disagreement_score":0.009675026,"about_ca_system_score_codex":0.0009353814,"about_ca_system_score_gemma":0.0014642376,"threshold_uncertainty_score":0.0192374},"labels":[],"label_agreement":null},{"id":"W2591926082","doi":"10.4028/www.scientific.net/aef.21.102","title":"Case Study on Modeling Fire Action Complexity in Fire Safety Engineering of Structures","year":2017,"lang":"en","type":"article","venue":"Advanced engineering forum","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Fire safety; Fire protection engineering; Fire protection; Action (physics); Restructuring; Engineering; Modular design; Architectural engineering; Field (mathematics); Construction engineering; Civil engineering; Risk analysis (engineering); Business; Computer science","score_opus":0.03461258873090577,"score_gpt":0.27190254257617397,"score_spread":0.2372899538452682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2591926082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8195346,0.0007699684,0.15034002,0.00088560634,0.0000942354,0.00050926226,0.000992378,0.00032643936,0.026547506],"genre_scores_gemma":[0.9062734,0.00040763456,0.084653154,0.000052722888,0.000021938047,0.0002530112,0.0005307332,0.00007934474,0.007728116],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991315,0.00045203007,0.00004200052,0.00011540856,0.00015881714,0.00010024374],"domain_scores_gemma":[0.99680555,0.0024673676,0.00013539793,0.00018449732,0.00026022634,0.00014697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014488403,0.0008234571,0.0005272924,0.0010646909,0.0014858581,0.0016868453,0.0015550132,0.0029153035,0.0057452293],"category_scores_gemma":[0.0031041955,0.00043944354,0.001427557,0.00093924825,0.0014129727,0.0016181523,0.0015614139,0.0017290901,0.0003992751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003052385,0.0007913042,0.013348682,0.00042128452,0.00008678845,0.004080721,0.0023283488,0.9162529,0.004717171,0.03556447,0.0022764092,0.019826712],"study_design_scores_gemma":[0.00008069937,0.00022497406,0.0038900385,0.00009684128,0.000067613204,0.000438469,0.0015211739,0.9675102,0.0043862583,0.0105298525,0.011220259,0.000033647946],"about_ca_topic_score_codex":0.018871166,"about_ca_topic_score_gemma":0.02843496,"teacher_disagreement_score":0.018871166,"about_ca_system_score_codex":0.0018181413,"about_ca_system_score_gemma":0.0010572285,"threshold_uncertainty_score":0.037522614},"labels":[],"label_agreement":null},{"id":"W2591945424","doi":"10.1139/cjce-2016-0401","title":"Optimizing profit and logistics for precast concrete production","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Profit (economics); Production (economics); Production planning; Decision maker; Computer science; Operations research; Operations management; Business; Engineering; Civil engineering; Economics","score_opus":0.016413656999444384,"score_gpt":0.2009657009332642,"score_spread":0.18455204393381983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2591945424","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34779218,0.00075231696,0.6175737,0.0013392149,0.000057894293,0.00042549835,0.00032825948,0.00032048995,0.031410433],"genre_scores_gemma":[0.96900654,0.00034272482,0.02616898,0.000024016654,0.0000082053575,0.00010441915,0.00007937255,0.000032520296,0.0042332755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930644,0.00024164296,0.000024593577,0.00016549585,0.000105910556,0.00015601286],"domain_scores_gemma":[0.99954176,0.00022231489,0.000104665676,0.000027927977,0.000055218305,0.000048198053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008912312,0.00091842323,0.0006819223,0.0007300124,0.00065817503,0.0021680582,0.0008564077,0.0011219836,0.0037637758],"category_scores_gemma":[0.0022715696,0.0005485307,0.0007422567,0.0010337594,0.00068775704,0.0026199603,0.0009617098,0.0006859439,0.00043165084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053832464,0.0000810267,0.001881161,0.00006683955,0.000017093056,0.00012851092,0.0000590676,0.9708447,0.0011819961,0.012236653,0.00040391585,0.013045142],"study_design_scores_gemma":[0.000013378347,0.00009671743,0.0013016919,0.00001588179,0.000022470356,0.000054851585,0.00018805679,0.9851627,0.0013319419,0.010744179,0.0010485655,0.000019533218],"about_ca_topic_score_codex":0.0071422616,"about_ca_topic_score_gemma":0.007206055,"teacher_disagreement_score":0.0071422616,"about_ca_system_score_codex":0.0030135894,"about_ca_system_score_gemma":0.004140469,"threshold_uncertainty_score":0.021865249},"labels":[],"label_agreement":null},{"id":"W2601047779","doi":"","title":"Proceedings of the 2013 IEEE 17th International Conference on Computer Supported Cooperative Work in Design","year":2013,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Work (physics); Computer science; Engineering management; Engineering; Mechanical engineering","score_opus":0.02026961814773091,"score_gpt":0.21149251353809712,"score_spread":0.19122289539036622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2601047779","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043171063,0.024905387,0.6623947,0.008675069,0.025217103,0.00065281923,0.0007374448,0.0027389706,0.23150747],"genre_scores_gemma":[0.22472426,0.020134063,0.20709738,0.0013139044,0.0024589654,0.0007666465,0.0044700108,0.0016551228,0.53737956],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99742705,0.0009544427,0.00011448497,0.00027904144,0.0009816856,0.00024326013],"domain_scores_gemma":[0.9958431,0.0009071206,0.000082661805,0.001020064,0.0015260391,0.0006210435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057421993,0.0010440601,0.0015304768,0.0014358384,0.0015054467,0.0049130437,0.0016871835,0.0014999469,0.04965801],"category_scores_gemma":[0.004730295,0.0005397198,0.0010121217,0.0013351064,0.0016023619,0.0020076719,0.0033994818,0.0022346494,0.01167216],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005218217,0.000876054,0.0025418273,0.0005766144,0.00013823695,0.0002527845,0.0019923053,0.0037040287,0.01066567,0.033508,0.23720694,0.7080157],"study_design_scores_gemma":[0.00006165408,0.0002646193,0.0050485567,0.00054207473,0.0001403114,0.0003958939,0.0016951422,0.021916874,0.009489356,0.02777076,0.93260455,0.0000702709],"about_ca_topic_score_codex":0.00605679,"about_ca_topic_score_gemma":0.011851752,"teacher_disagreement_score":0.04965801,"about_ca_system_score_codex":0.0012552871,"about_ca_system_score_gemma":0.0035601147,"threshold_uncertainty_score":0.16612262},"labels":[],"label_agreement":null},{"id":"W2602378149","doi":"10.5278/ojs.td.v1i1.5677","title":"Framework for Railway Phase-based Planning","year":2020,"lang":"en","type":"article","venue":"Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Phase (matter); Computer science; Chemistry","score_opus":0.02541469337198768,"score_gpt":0.23454411603484707,"score_spread":0.2091294226628594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2602378149","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00050779013,0.00045361533,0.98400867,0.00036485604,0.00006795207,0.00022283259,0.00045656832,0.00035286788,0.013564891],"genre_scores_gemma":[0.03307098,0.0011709691,0.95778394,0.00012387882,0.00008275973,0.0009163774,0.0012829801,0.00022849126,0.005339624],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99780947,0.00084934797,0.00020116512,0.00030790575,0.00061814894,0.00021395808],"domain_scores_gemma":[0.99877506,0.0005075657,0.000097635864,0.00016842461,0.0003738857,0.00007749456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003790121,0.0017112716,0.0013277675,0.0026139102,0.0012300073,0.0051185326,0.0043297876,0.0018752089,0.015945626],"category_scores_gemma":[0.004711949,0.0011211006,0.0036682615,0.0038425254,0.0017487321,0.0028061047,0.003260625,0.00254557,0.0041905553],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021481492,0.000039364397,0.00026985115,0.00021415619,0.00004079983,0.00016849517,0.00019002486,0.2567313,0.00034230843,0.6962336,0.0042248713,0.041523796],"study_design_scores_gemma":[0.000042094834,0.000042487223,0.00015619915,0.00025708316,0.000042304753,0.00014901432,0.0001558058,0.3908555,0.00037324132,0.49537733,0.112505004,0.00004390884],"about_ca_topic_score_codex":0.021738088,"about_ca_topic_score_gemma":0.019847222,"teacher_disagreement_score":0.021738088,"about_ca_system_score_codex":0.0044361567,"about_ca_system_score_gemma":0.005072003,"threshold_uncertainty_score":0.053343415},"labels":[],"label_agreement":null},{"id":"W2603912831","doi":"10.1061/9780784480434.004","title":"Automation of Large-Scale Geotextile and Geomembrane Fabrication","year":2017,"lang":"en","type":"article","venue":"Geotechnical Frontiers 2017","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"TC Scientific (Canada); DSM (Canada); Greenfield Research (Canada)","funders":"","keywords":"Geomembrane; Geotextile; Fabrication; Scale (ratio); Automation; Scope (computer science); Welding; Engineering; Computer science; Manufacturing engineering; Construction engineering; Mechanical engineering; Geotechnical engineering","score_opus":0.006746331917608263,"score_gpt":0.22270102184652824,"score_spread":0.21595468992891997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2603912831","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.113210775,0.00023135953,0.86167467,0.00021859894,0.00016999082,0.000613898,0.000414199,0.008733562,0.0147330165],"genre_scores_gemma":[0.39007935,0.0002374936,0.60367733,0.00005409016,0.000031833555,0.0003571422,0.000568934,0.0004562463,0.0045374823],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99801886,0.00023719121,0.00014792895,0.0003288777,0.0010608349,0.00020630752],"domain_scores_gemma":[0.9975079,0.0006950745,0.00023032549,0.0011490406,0.0003176334,0.000099969046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015015941,0.00066409947,0.00064066437,0.0007486659,0.0006882197,0.0011129419,0.000911151,0.0006328914,0.0045738276],"category_scores_gemma":[0.0027662197,0.00055971736,0.00042004633,0.00074412714,0.00058150414,0.0009873159,0.001657325,0.0009656418,0.0025659073],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017998718,0.000381114,0.0048503084,0.00047404892,0.00002368342,0.0009129937,0.0008022178,0.026874702,0.54835033,0.0081528975,0.004969926,0.4040279],"study_design_scores_gemma":[0.00006303509,0.0006244954,0.02482681,0.00008710855,0.00003152408,0.0025294623,0.0005011618,0.09284346,0.7473406,0.009584797,0.12141345,0.00015402584],"about_ca_topic_score_codex":0.00063837925,"about_ca_topic_score_gemma":0.0015132092,"teacher_disagreement_score":0.0045738276,"about_ca_system_score_codex":0.00031664665,"about_ca_system_score_gemma":0.0009498513,"threshold_uncertainty_score":0.01530093},"labels":[],"label_agreement":null},{"id":"W26051266","doi":"10.1039/c5cp01993a","title":"Using 3-D blueprints at a construction site","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science","score_opus":0.013403270543075588,"score_gpt":0.2026513050801605,"score_spread":0.1892480345370849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W26051266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28521052,0.00055133697,0.56177145,0.0005127438,0.00079356943,0.00030899016,0.009222213,0.055295724,0.08633358],"genre_scores_gemma":[0.4907037,0.00050464587,0.44602424,0.00023102661,0.000037647238,0.00070702203,0.0057300557,0.0032849975,0.052776735],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998067,0.000015211208,0.000010511725,0.00006142313,0.000068533955,0.000037701135],"domain_scores_gemma":[0.99957186,0.00005143769,0.000042837444,0.00020458305,0.000071925824,0.000057242585],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028412408,0.00056967896,0.00034741024,0.00044491063,0.00026801432,0.0007046483,0.0011130918,0.0006992062,0.024475839],"category_scores_gemma":[0.00040038905,0.0004133945,0.00046456206,0.0006130075,0.0002774672,0.00062827306,0.0010333734,0.0008503931,0.013870235],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006977493,0.0002025097,0.0030868032,0.00048450934,0.0000373508,0.0005492255,0.0002601333,0.01986314,0.7716502,0.020442799,0.016297141,0.1664284],"study_design_scores_gemma":[0.00005499759,0.00035914994,0.0017871186,0.000026548825,0.000035540623,0.00034734397,0.00008757683,0.043326415,0.6954232,0.0028770808,0.25561428,0.000060837665],"about_ca_topic_score_codex":0.00097393856,"about_ca_topic_score_gemma":0.0014356825,"teacher_disagreement_score":0.024475839,"about_ca_system_score_codex":0.0004977543,"about_ca_system_score_gemma":0.0005328976,"threshold_uncertainty_score":0.081879854},"labels":[],"label_agreement":null},{"id":"W2605404504","doi":"10.7712/120113.4701.c1063","title":"A NEW PERFORMANCE-BASED DESIGN METHODOLOGY FOR CONTROLLED ROCKING STEEL FRAMES","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Engineering drawing; Engineering","score_opus":0.04772252239349974,"score_gpt":0.25316429970901716,"score_spread":0.2054417773155174,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2605404504","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019874948,0.000033902397,0.996523,0.000010937436,0.000012676665,0.000026531412,0.0000086334385,0.00008194242,0.0013148446],"genre_scores_gemma":[0.32817107,0.0002804689,0.66485715,0.000049013106,0.000049811733,0.00031918235,0.0001141427,0.0002496201,0.005909457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999435,0.00010368194,0.00002830749,0.00007307204,0.00032290624,0.00003693063],"domain_scores_gemma":[0.9997129,0.000060886254,0.000040826413,0.000030929747,0.0001415934,0.000012800569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000977519,0.0010287865,0.00069591624,0.0006937661,0.00032187844,0.00071922276,0.0013139122,0.00059769186,0.0033991716],"category_scores_gemma":[0.0007635207,0.00045682664,0.0007245395,0.00033359413,0.00049169164,0.0006195174,0.0006953865,0.0006993685,0.0005852381],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005018799,0.00007830433,0.00021563415,0.0002489425,0.000039530594,0.00006383496,0.00007562905,0.81520677,0.057760164,0.034310263,0.00065004197,0.09130067],"study_design_scores_gemma":[0.000013417308,0.000108802094,0.0000766925,0.000013108308,0.000015238901,0.000021235246,0.0000070971896,0.9866023,0.0060206656,0.0031625223,0.003951103,0.000007839483],"about_ca_topic_score_codex":0.0012876979,"about_ca_topic_score_gemma":0.0015669134,"teacher_disagreement_score":0.0033991716,"about_ca_system_score_codex":0.0005154946,"about_ca_system_score_gemma":0.00067887333,"threshold_uncertainty_score":0.0113713145},"labels":[],"label_agreement":null},{"id":"W2607494137","doi":"10.1186/s40327-017-0044-3","title":"Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization","year":2017,"lang":"en","type":"article","venue":"Visualization in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Duration (music); Supply chain; Prefabrication; Gantt chart; Scheduling (production processes); Schedule; Modular design; Reservation; Computer science; Engineering; Systems engineering; Manufacturing engineering; Construction engineering; Operations research; Operations management; Civil engineering; Business","score_opus":0.010852543148798388,"score_gpt":0.238328426565875,"score_spread":0.2274758834170766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2607494137","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17958301,0.00017549051,0.8076242,0.0003020995,0.000029247469,0.00014166339,0.00019869814,0.0006345601,0.011310957],"genre_scores_gemma":[0.8609935,0.0001101641,0.13632785,0.000031333177,0.000008745198,0.00012537694,0.00014627592,0.00009656471,0.0021602549],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997609,0.00009730044,0.00000734855,0.000031965672,0.000053622556,0.000048831713],"domain_scores_gemma":[0.99956566,0.00026568788,0.00005820269,0.000022203914,0.000054274784,0.00003405637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007250959,0.00059320586,0.00054213585,0.0004691522,0.00024925795,0.000803632,0.00058115454,0.00053809356,0.0022504206],"category_scores_gemma":[0.0013517289,0.0003067726,0.00037264853,0.0004852777,0.00034024016,0.00045282426,0.00045618237,0.0004622082,0.00015684859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024832236,0.00001709994,0.00024438684,0.000019334202,0.000004113707,0.000012959602,0.000015744114,0.9923874,0.0005851322,0.0010318288,0.00014609493,0.005511049],"study_design_scores_gemma":[0.0000033953331,0.000013687148,0.00011789167,0.0000022824731,0.00000207546,0.000002432592,0.000009828378,0.99872154,0.00037458623,0.0005516073,0.00019868214,0.0000019014877],"about_ca_topic_score_codex":0.007821774,"about_ca_topic_score_gemma":0.0053727594,"teacher_disagreement_score":0.007821774,"about_ca_system_score_codex":0.0007706706,"about_ca_system_score_gemma":0.0014848539,"threshold_uncertainty_score":0.015552461},"labels":[],"label_agreement":null},{"id":"W2608455727","doi":"10.4224/20377989","title":"PERD 079 Project - Task 4 - Review of work plan and selection of wall assemblies","year":2008,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Task (project management); Selection (genetic algorithm); Work (physics); Plan (archaeology); Computer science; Operations research; Systems engineering; Engineering; Artificial intelligence; Geology; Mechanical engineering","score_opus":0.01767616870318328,"score_gpt":0.22163137260728033,"score_spread":0.20395520390409705,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2608455727","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07855174,0.027607035,0.25929987,0.012369582,0.004154564,0.03319691,0.03299651,0.006010496,0.54581326],"genre_scores_gemma":[0.099311896,0.024958955,0.3494797,0.001458664,0.0006205787,0.019425498,0.07049676,0.0021939345,0.432054],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98708063,0.003774605,0.00093819195,0.0007597688,0.0065462575,0.0009005474],"domain_scores_gemma":[0.98587114,0.0007315099,0.0007509354,0.0009896856,0.010909377,0.00074734323],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02348885,0.0010290189,0.0008217268,0.0065521053,0.0022363383,0.004450532,0.0028309692,0.0012795129,0.02029266],"category_scores_gemma":[0.009531228,0.0008010249,0.00056724134,0.003912998,0.0007764457,0.0022820744,0.0022259864,0.0012109396,0.015581161],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004563708,0.0009162218,0.0046045687,0.0040072273,0.000032138174,0.0005840936,0.0015992225,0.0073338537,0.02019056,0.018667268,0.26289383,0.67871463],"study_design_scores_gemma":[0.00003664502,0.0005773002,0.006083121,0.0011841048,0.000022819318,0.00028211076,0.0012701785,0.0012019181,0.01122521,0.0009478762,0.9771178,0.00005081959],"about_ca_topic_score_codex":0.019942144,"about_ca_topic_score_gemma":0.024653276,"teacher_disagreement_score":0.02348885,"about_ca_system_score_codex":0.0049232184,"about_ca_system_score_gemma":0.01985315,"threshold_uncertainty_score":0.1242224},"labels":[],"label_agreement":null},{"id":"W2610527462","doi":"","title":"Proc. 19th IEEE International Conference on Computer Supported Cooperative Work in Design, CSCWD 2015","year":2015,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Work (physics); Computer science; Engineering; Engineering management; Library science; Mechanical engineering","score_opus":0.03822328292050867,"score_gpt":0.2529316685281148,"score_spread":0.2147083856076061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2610527462","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0481602,0.050178908,0.6276984,0.017272009,0.040597647,0.0008809259,0.002115523,0.006690869,0.20640549],"genre_scores_gemma":[0.19013669,0.029799655,0.21673161,0.002329684,0.0031145392,0.0007603899,0.011128885,0.0022695614,0.543729],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99769187,0.00082655915,0.00013572733,0.00030517168,0.0008289052,0.00021183587],"domain_scores_gemma":[0.99591404,0.0007517201,0.00008031254,0.001060122,0.0015941857,0.00059959793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005591041,0.0011891038,0.0013076258,0.0018785936,0.0017329406,0.004844214,0.001941998,0.0016688211,0.05353906],"category_scores_gemma":[0.005620239,0.0005977278,0.00073742785,0.0013843792,0.0018181128,0.0033538998,0.0037693044,0.0024988402,0.019608451],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047257962,0.00058861036,0.0021824515,0.0005441304,0.00009564692,0.00030446547,0.0016411395,0.0018344482,0.009262725,0.014415798,0.46087372,0.5077843],"study_design_scores_gemma":[0.000063786654,0.00026876555,0.0051709325,0.00055248494,0.00012511913,0.00043731654,0.0016825225,0.011748858,0.008250799,0.01824741,0.9533863,0.000065588974],"about_ca_topic_score_codex":0.00895777,"about_ca_topic_score_gemma":0.024126582,"teacher_disagreement_score":0.05353906,"about_ca_system_score_codex":0.0014374946,"about_ca_system_score_gemma":0.0031234242,"threshold_uncertainty_score":0.179106},"labels":[],"label_agreement":null},{"id":"W2617402647","doi":"10.4236/ti.2017.82011","title":"Research on Selection of Technological Innovation Mode for Large and Medium-Sized Construction Enterprises in China","year":2017,"lang":"en","type":"article","venue":"Technology and Investment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"China; Selection (genetic algorithm); Mode (computer interface); Industrial organization; Business; Computer science; Political science","score_opus":0.024100001003872884,"score_gpt":0.3098014457884637,"score_spread":0.2857014447845908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2617402647","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9964923,0.000094580384,0.0006341321,0.00008134892,0.000001576378,0.000022355001,0.000028338824,0.0000050442795,0.0026402953],"genre_scores_gemma":[0.999281,0.00007805635,0.00022595271,0.0000060970474,9.98211e-7,0.000011442631,0.000024662142,9.3913764e-7,0.0003709289],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986494,0.0002124979,0.00009577281,0.00022664938,0.00039036738,0.00042533092],"domain_scores_gemma":[0.9978811,0.0007170717,0.00043370863,0.000098688,0.0004475729,0.000421819],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002170681,0.00030073817,0.00032024208,0.0038392618,0.0013232316,0.0021047937,0.0006598982,0.0004303591,0.0015669902],"category_scores_gemma":[0.0029608856,0.00022494979,0.0006513781,0.0035185833,0.0008594663,0.0023295118,0.0013045085,0.00035330452,0.00011899044],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012103635,0.000220227,0.9224503,0.00014585548,0.00007825015,0.0004942332,0.008833898,0.003160139,0.0021419635,0.015203976,0.000398488,0.046751615],"study_design_scores_gemma":[0.000020993895,0.00013577973,0.9580726,0.00007435676,0.0000780987,0.0001985424,0.015390235,0.019410128,0.0011870143,0.0033844924,0.0020139473,0.000033724646],"about_ca_topic_score_codex":0.020282194,"about_ca_topic_score_gemma":0.025446363,"teacher_disagreement_score":0.020282194,"about_ca_system_score_codex":0.0040898873,"about_ca_system_score_gemma":0.0047280733,"threshold_uncertainty_score":0.040328324},"labels":[],"label_agreement":null},{"id":"W2619168597","doi":"10.1111/cgf.13105","title":"Design Transformations for Rule-based Procedural Modeling","year":2017,"lang":"en","type":"article","venue":"Computer Graphics Forum","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kootenay Association for Science & Technology","funders":"","keywords":"Computer science; Transformation (genetics); Rule-based machine translation; Procedural modeling; Variety (cybernetics); Theoretical computer science; Grammar; Programming language; Algorithm; Artificial intelligence","score_opus":0.027901779223121034,"score_gpt":0.23249221616099958,"score_spread":0.20459043693787854,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2619168597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0004750053,0.00006607748,0.99513006,0.000082474144,0.000028179322,0.000054209166,0.000048697537,0.0005842713,0.0035310627],"genre_scores_gemma":[0.029511243,0.00024915565,0.9655597,0.0001804424,0.000038764614,0.00032609818,0.00036164033,0.00051702716,0.0032558825],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9968941,0.00079317426,0.00028443913,0.000410787,0.0014639947,0.00015354455],"domain_scores_gemma":[0.9976852,0.00078173424,0.00013638608,0.0009832506,0.0003462259,0.000067148714],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024130128,0.0010888812,0.0005973035,0.0011412905,0.0008824394,0.0022706792,0.0022997984,0.0016758881,0.0074430937],"category_scores_gemma":[0.0056045623,0.00082122226,0.0022161598,0.0011669069,0.0029176653,0.0025225254,0.0027128998,0.003926563,0.0033916382],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024146824,0.00007218569,0.0002516925,0.00020443028,0.000039814233,0.00022738957,0.00042600263,0.056122858,0.007886772,0.8324672,0.004428189,0.09784937],"study_design_scores_gemma":[0.000032372194,0.00005570592,0.00009685238,0.00012864795,0.00004935954,0.00030358776,0.00007625738,0.18198004,0.011990357,0.5965413,0.20870827,0.000037294296],"about_ca_topic_score_codex":0.0013944249,"about_ca_topic_score_gemma":0.0017708282,"teacher_disagreement_score":0.0074430937,"about_ca_system_score_codex":0.0011309416,"about_ca_system_score_gemma":0.0016267427,"threshold_uncertainty_score":0.024899662},"labels":[],"label_agreement":null},{"id":"W2619588521","doi":"10.34626/33w9-m815","title":"Proposta de uma Estrutura para o Código da Construção em Portugal no Domínio da Higrotérmica","year":2011,"lang":"pt","type":"dissertation","venue":"Open Repository of the University of Porto (University of Porto)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.01377033913553965,"score_gpt":0.19923764818908393,"score_spread":0.18546730905354428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2619588521","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.121789314,0.009960903,0.115935825,0.037823368,0.0021774827,0.0007931355,0.00031367937,0.0007940226,0.71041226],"genre_scores_gemma":[0.7618787,0.0068894457,0.12362027,0.002613075,0.00043393232,0.00043022237,0.00034362852,0.00042175848,0.10336893],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9956691,0.0018524536,0.00023934837,0.00051908725,0.0012336465,0.00048625676],"domain_scores_gemma":[0.9936207,0.0026376788,0.0005037551,0.0011373825,0.0014586644,0.0006417218],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004770631,0.00055422075,0.00030007114,0.0021758315,0.007053592,0.011137873,0.001915984,0.0030159743,0.005032311],"category_scores_gemma":[0.01085327,0.0003574929,0.0006733946,0.0016488557,0.010261326,0.005186036,0.00454139,0.0024019948,0.000977416],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005720329,0.00008895614,0.003063097,0.0009228178,0.0000132569485,0.0032381103,0.10513182,0.0008772576,0.0027111575,0.7159727,0.014485244,0.15343836],"study_design_scores_gemma":[0.000011411198,0.000054839034,0.0024598432,0.0016987101,0.000022828764,0.0014540353,0.03570216,0.0014225771,0.0014745664,0.038508527,0.9171488,0.000041711777],"about_ca_topic_score_codex":0.02880265,"about_ca_topic_score_gemma":0.05502523,"teacher_disagreement_score":0.02880265,"about_ca_system_score_codex":0.007973162,"about_ca_system_score_gemma":0.015982436,"threshold_uncertainty_score":0.057849646},"labels":[],"label_agreement":null},{"id":"W2624855859","doi":"10.1061/9780784480830.031","title":"Planning Rough-Grading Projects: CAT Handbook vs. RS Means","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Grading (engineering); Computer science; Hoist (device); Productivity; Operations research; Industrial engineering; Engineering; Civil engineering","score_opus":0.02366660187588807,"score_gpt":0.24291896015364334,"score_spread":0.21925235827775527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2624855859","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04662331,0.0013593283,0.8864502,0.0008521249,0.000091108064,0.0006463959,0.002879249,0.0042327526,0.056865565],"genre_scores_gemma":[0.24525782,0.0015927874,0.73822385,0.00013917779,0.00003542293,0.0009012634,0.0038436798,0.00076839153,0.009237641],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961696,0.0015693482,0.00030215696,0.0002732769,0.0015776661,0.00010797674],"domain_scores_gemma":[0.98697716,0.0076218667,0.000916673,0.0017798552,0.002541251,0.00016315014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004557457,0.00068113283,0.0007854571,0.0031518587,0.00042583505,0.0031131757,0.0019054292,0.0008129951,0.008245006],"category_scores_gemma":[0.014991746,0.0007122176,0.0007186353,0.00475323,0.0007371742,0.00231609,0.001238687,0.0008926079,0.0017476586],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027505966,0.0002090229,0.004027786,0.0013224651,0.00010111895,0.00016324138,0.001064166,0.40041527,0.0019719787,0.12139904,0.03002385,0.43902698],"study_design_scores_gemma":[0.00009435763,0.00060490414,0.0072010662,0.00065570045,0.00009886407,0.00043007568,0.0018436742,0.7633711,0.0040329923,0.07898999,0.14243774,0.00023958657],"about_ca_topic_score_codex":0.010542359,"about_ca_topic_score_gemma":0.02124283,"teacher_disagreement_score":0.010542359,"about_ca_system_score_codex":0.0018324369,"about_ca_system_score_gemma":0.003154008,"threshold_uncertainty_score":0.027582347},"labels":[],"label_agreement":null},{"id":"W2625069236","doi":"10.19255/jmpm01304","title":"Building Information Modeling (BIM) in Brazil's Architecture, Engineering and Construction (AEC) Industry: A Review and a Bibliometric Study","year":2017,"lang":"en","type":"review","venue":"Swinburne Research Bank (Swinburne University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Building information modeling; Scope (computer science); Interoperability; Architecture; Process (computing); Engineering management; Engineering; Construction industry; Work (physics); Sustainability; Construction engineering; Facility management; Architectural engineering; Process management; Knowledge management; Systems engineering; Computer science; Business; Operations management; World Wide Web","score_opus":0.055250643404401494,"score_gpt":0.3341857389141401,"score_spread":0.2789350955097386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625069236","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00035425895,0.9986828,0.00008855477,0.00018688192,0.000031772513,0.0000059827935,0.00003624447,0.000002919704,0.00061064225],"genre_scores_gemma":[0.0037090802,0.9958974,0.00019771491,0.00007042841,0.000032436157,0.000008601934,0.000035307603,0.0000017230072,0.000047358397],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99787104,0.00054646516,0.00050116394,0.00022818042,0.00078315154,0.00006990246],"domain_scores_gemma":[0.9887229,0.008206299,0.0012396922,0.00021930333,0.0014303006,0.00018146605],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0042288476,0.0007467734,0.0020276178,0.020464366,0.00059171993,0.0022549897,0.0010262713,0.0012587521,0.0020575272],"category_scores_gemma":[0.0105348155,0.0006226769,0.00084011006,0.03573015,0.0012070311,0.0029005473,0.0014723149,0.0009378456,0.0004036593],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044243086,0.00005002834,0.001509185,0.14147583,0.00030576214,0.00014458878,0.0006193186,0.000373034,0.00033528567,0.0055992897,0.007075955,0.8424675],"study_design_scores_gemma":[0.000020177355,0.00019751977,0.018745981,0.18221092,0.0024264746,0.0017527415,0.002116667,0.000466421,0.0008734721,0.003733858,0.7873589,0.000096906086],"about_ca_topic_score_codex":0.008613597,"about_ca_topic_score_gemma":0.016698917,"teacher_disagreement_score":0.97953564,"about_ca_system_score_codex":0.002111984,"about_ca_system_score_gemma":0.0074797133,"threshold_uncertainty_score":0.022364557},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"not_applicable","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"design_other","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"split"},{"id":"W2625207554","doi":"10.1061/9780784480823.007","title":"BIM to Facilities Management: Presenting a Proven Workflow for Information Exchange","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Merck Canada Inc. (Canada)","funders":"","keywords":"Workflow; Asset management; Deliverable; Computer science; Asset (computer security); Process management; Building information modeling; Leverage (statistics); Knowledge management; Information system; Data exchange; Information exchange; Engineering management; Systems engineering; Business; Database; Operations management; Scheduling (production processes); Engineering; Computer security; Finance","score_opus":0.014510449497048477,"score_gpt":0.22268896847860895,"score_spread":0.20817851898156048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2625207554","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053286743,0.0001616826,0.9665981,0.002447393,0.0001412564,0.00045894747,0.00036949667,0.0042971116,0.020197354],"genre_scores_gemma":[0.061050795,0.00034638314,0.93111557,0.00042554483,0.00008180254,0.00045004033,0.000977893,0.0007522618,0.0047997963],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9815393,0.009997243,0.0015785289,0.001500168,0.004560876,0.0008238074],"domain_scores_gemma":[0.9759269,0.0077368654,0.0012077064,0.010239985,0.004000118,0.0008884342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020527443,0.0014694569,0.00083338795,0.0043941154,0.003520567,0.011463674,0.0040040663,0.0026901874,0.008773961],"category_scores_gemma":[0.037602663,0.0013820963,0.0015877215,0.004965714,0.0034259537,0.012502356,0.010805103,0.003732059,0.006466779],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021435588,0.0005690511,0.0035759213,0.00067521376,0.000100317215,0.0007242415,0.014715856,0.017722657,0.0064799073,0.3101521,0.024655605,0.6204147],"study_design_scores_gemma":[0.00013635009,0.00033318228,0.002503292,0.0015941913,0.000097516684,0.0010985951,0.006914629,0.088196725,0.020369545,0.33829868,0.5400886,0.00036874574],"about_ca_topic_score_codex":0.0063101384,"about_ca_topic_score_gemma":0.0045641246,"teacher_disagreement_score":0.020527443,"about_ca_system_score_codex":0.0027499774,"about_ca_system_score_gemma":0.008017597,"threshold_uncertainty_score":0.10856074},"labels":[],"label_agreement":null},{"id":"W2626000505","doi":"10.1061/9780784480823.015","title":"3D Model-Based Quantity Take-Off for Construction Estimates","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Component (thermodynamics); Estimator; Industrial engineering; Building information modeling; Data modeling; Estimation; Data mining; Software engineering; Systems engineering; Engineering; Operations management","score_opus":0.022070255942967514,"score_gpt":0.2555505215299778,"score_spread":0.2334802655870103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2626000505","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010500532,0.00006058775,0.98394877,0.000044930715,0.00003073734,0.00012875695,0.00034357232,0.0017449042,0.0031973044],"genre_scores_gemma":[0.26040888,0.00016692877,0.734801,0.00003338251,0.0000331647,0.00041439134,0.0015085744,0.00045107753,0.0021826096],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988655,0.00016978799,0.0000860081,0.00017864002,0.00063344446,0.000066673885],"domain_scores_gemma":[0.9976719,0.00079476077,0.0002600787,0.00039766566,0.00081795926,0.00005753073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001308832,0.0014402906,0.0010625907,0.0033558656,0.0006002148,0.00184334,0.0017651393,0.0011080655,0.008583562],"category_scores_gemma":[0.0073855496,0.0010480173,0.0011034781,0.0026566514,0.00050347496,0.0015411422,0.0018416676,0.0010827653,0.0019626587],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013990913,0.00019175815,0.00513591,0.0003588219,0.000054775774,0.00017100631,0.00028414128,0.6517882,0.007881441,0.01060179,0.004365723,0.31902665],"study_design_scores_gemma":[0.000009594413,0.000027086417,0.0010073013,0.00002332471,0.000010363108,0.00004381173,0.00005411033,0.99068564,0.0027092295,0.002545287,0.002862068,0.000022309125],"about_ca_topic_score_codex":0.008695504,"about_ca_topic_score_gemma":0.010757431,"teacher_disagreement_score":0.008695504,"about_ca_system_score_codex":0.0009230724,"about_ca_system_score_gemma":0.001552873,"threshold_uncertainty_score":0.028714895},"labels":[],"label_agreement":null},{"id":"W2626097300","doi":"10.1061/9780784480847.013","title":"Towards Developing an Ontology for Earthwork Operations","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Computer science; Earthworks; Domain (mathematical analysis); Knowledge management; Information exchange; Data exchange; Software engineering; World Wide Web; Engineering; Telecommunications","score_opus":0.03314021745691838,"score_gpt":0.28476674120211415,"score_spread":0.2516265237451958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2626097300","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035213253,0.00034171622,0.9845316,0.0013348171,0.0001530665,0.0005742472,0.000484976,0.00049382704,0.008564458],"genre_scores_gemma":[0.022794858,0.0008190191,0.9717022,0.0003163951,0.000047100017,0.0005534266,0.0016135497,0.00014038997,0.0020129574],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.994932,0.0014654336,0.0009884996,0.0006405242,0.0015995532,0.0003740537],"domain_scores_gemma":[0.9958242,0.0012057052,0.00048321206,0.0007664564,0.0013969449,0.0003235322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008058405,0.0010700235,0.0011693481,0.005913465,0.0027952085,0.006923052,0.0030415403,0.0025519584,0.0017478373],"category_scores_gemma":[0.008328844,0.0012670181,0.0036905431,0.0049967407,0.0035273384,0.012986524,0.006046135,0.006021104,0.0011810057],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025734103,0.00024563159,0.0012809087,0.0004894663,0.000073267,0.0007101278,0.0043391176,0.014414401,0.004884842,0.8778319,0.0071552857,0.08854943],"study_design_scores_gemma":[0.00005848359,0.00007159596,0.0016373879,0.0014683261,0.00015295435,0.0011025592,0.0060167355,0.12533598,0.0054002097,0.4567657,0.40181622,0.00017376852],"about_ca_topic_score_codex":0.02047825,"about_ca_topic_score_gemma":0.017313808,"teacher_disagreement_score":0.02047825,"about_ca_system_score_codex":0.0037577478,"about_ca_system_score_gemma":0.01266455,"threshold_uncertainty_score":0.04261738},"labels":[],"label_agreement":null},{"id":"W2641878396","doi":"10.1061/(asce)co.1943-7862.0001364","title":"The University of Alberta’s Hole School of Construction Engineering: 25 Years of Impact and Innovation","year":2017,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Speculation; Relevance (law); Audience measurement; Editorial board; Engineering; Political science; Engineering ethics; Library science; Media studies; Sociology; Management; Law; Economics; Computer science","score_opus":0.004403314453956561,"score_gpt":0.18529836120196835,"score_spread":0.1808950467480118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2641878396","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06292492,0.31231007,0.0038965677,0.2838021,0.01514955,0.00013161004,0.00083692704,0.00042503854,0.3205233],"genre_scores_gemma":[0.5259373,0.19390006,0.0051024854,0.010591377,0.0046949494,0.00009467493,0.0008602565,0.00030724946,0.2585115],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9915063,0.0008324493,0.00016242928,0.00036919778,0.005478244,0.0016513366],"domain_scores_gemma":[0.9799216,0.003210103,0.000637147,0.0009896798,0.0052942405,0.009947351],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0156129785,0.0007995394,0.0009003346,0.0061727203,0.008352105,0.025678938,0.0016832559,0.0038225858,0.016650995],"category_scores_gemma":[0.012472497,0.00055743865,0.0004395062,0.01103358,0.012503863,0.006921777,0.008370216,0.004036919,0.0027188524],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020892678,0.00027179124,0.008442811,0.00059922406,0.000031612628,0.00035480835,0.013096698,0.0006869991,0.00089792244,0.17127658,0.26905197,0.5350807],"study_design_scores_gemma":[0.000012285235,0.00006610347,0.018069115,0.00089674664,0.000015122515,0.000061724255,0.009340399,0.0001818932,0.0004866768,0.014575847,0.9562485,0.00004552624],"about_ca_topic_score_codex":0.21946399,"about_ca_topic_score_gemma":0.44704938,"teacher_disagreement_score":0.9586084,"about_ca_system_score_codex":0.041391622,"about_ca_system_score_gemma":0.071052246,"threshold_uncertainty_score":0.43637317},"labels":[],"label_agreement":null},{"id":"W26532961","doi":"","title":"Bringing a construction site into the lab: a context-relevant lab-based evaluation of a multimodal mobile application","year":2006,"lang":"en","type":"book-chapter","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Context (archaeology); Modalities; Stylus; Computer science; Mobile apps; Engineering; Human–computer interaction; Work (physics); Systems engineering; Mobile device; Multimedia; World Wide Web; Mechanical engineering","score_opus":0.007881218495077245,"score_gpt":0.2268628822886017,"score_spread":0.21898166379352446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W26532961","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9257961,0.0009979248,0.02820204,0.0002545826,0.000058182657,0.0012800058,0.00030070313,0.00033051078,0.042779986],"genre_scores_gemma":[0.91019726,0.0009829173,0.067180976,0.0002940529,0.000039901533,0.0010397488,0.00050977856,0.0001902046,0.019565236],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9971259,0.0019403951,0.00006674534,0.00014570476,0.0006426983,0.00007845362],"domain_scores_gemma":[0.9970049,0.002021265,0.00009910288,0.00018387755,0.00054119347,0.00014972695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033824537,0.00062305713,0.00038953326,0.000626275,0.00055663614,0.0015315652,0.000857709,0.00089134916,0.0037859466],"category_scores_gemma":[0.005031285,0.00019577416,0.00021834571,0.00052757293,0.00062963465,0.0012575717,0.0013983966,0.0007147602,0.0008099805],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021388042,0.009265846,0.011071842,0.0027726053,0.00010848398,0.0016352148,0.040253583,0.009234133,0.21453474,0.0056628794,0.012206486,0.69111544],"study_design_scores_gemma":[0.00083399186,0.067755125,0.1593721,0.0016183612,0.0006358732,0.0054682265,0.06553132,0.052776843,0.4174036,0.006605376,0.22147241,0.0005268031],"about_ca_topic_score_codex":0.00044010906,"about_ca_topic_score_gemma":0.0013755123,"teacher_disagreement_score":0.0037859466,"about_ca_system_score_codex":0.00062860246,"about_ca_system_score_gemma":0.00041761645,"threshold_uncertainty_score":0.017888367},"labels":[],"label_agreement":null},{"id":"W2683943887","doi":"","title":"Fusing 4D modeling and laser scanning for automated construction progress control","year":2010,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Laser scanning; Computer science; Control (management); Artificial intelligence; Computer vision; Laser; Optics; Physics","score_opus":0.00597748130636891,"score_gpt":0.21757849487057734,"score_spread":0.21160101356420843,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2683943887","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027421912,0.00011651521,0.9689752,0.00004599092,0.00003704292,0.000039824907,0.00008111291,0.0019480906,0.0013343275],"genre_scores_gemma":[0.55594337,0.00025017507,0.44163245,0.00007329638,0.000021225856,0.00011097006,0.00036687375,0.00027984206,0.001321756],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985613,0.00017893528,0.00007939296,0.00020941849,0.0008578693,0.00011302906],"domain_scores_gemma":[0.9991522,0.00024464418,0.00014457137,0.00022674642,0.00020430768,0.000027610407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010210474,0.0010315891,0.0013027448,0.0024698256,0.0004475914,0.0010511145,0.0009762513,0.00097401836,0.0025482217],"category_scores_gemma":[0.0022383356,0.0015017692,0.00097143353,0.0025439179,0.0006719553,0.0017908504,0.002327849,0.00074950425,0.000897362],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039695075,0.00016582037,0.003767256,0.00018343756,0.00013819378,0.00018874266,0.00047093254,0.27043352,0.12415714,0.005081825,0.0016900987,0.5933261],"study_design_scores_gemma":[0.000010826626,0.000075609896,0.0021409465,0.000018173789,0.00003437054,0.00011331171,0.00006193054,0.9552448,0.036670193,0.0031120009,0.0024727588,0.000045153723],"about_ca_topic_score_codex":0.0042389557,"about_ca_topic_score_gemma":0.006942684,"teacher_disagreement_score":0.0042389557,"about_ca_system_score_codex":0.00064035755,"about_ca_system_score_gemma":0.0012624755,"threshold_uncertainty_score":0.008524656},"labels":[],"label_agreement":null},{"id":"W270424157","doi":"10.17226/23126","title":"Emerging Technologies for Construction Delivery","year":2007,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Computer science; Engineering; Systems engineering; Project management","score_opus":0.030994054816382868,"score_gpt":0.2921208527542026,"score_spread":0.26112679793781973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W270424157","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00225794,0.09979308,0.03430163,0.005581909,0.0029202683,0.00012648772,0.0002017451,0.00037631686,0.8544407],"genre_scores_gemma":[0.03651492,0.21969964,0.040236916,0.002886689,0.0016602569,0.00039430722,0.00060176215,0.0004349369,0.6975706],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984812,0.00024286227,0.00009145815,0.00012696713,0.0009694815,0.00008813143],"domain_scores_gemma":[0.9994789,0.00023515777,0.00003744358,0.000062120744,0.00015332318,0.000033110813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085257116,0.0010457654,0.00035287804,0.0028664225,0.0012014975,0.006546831,0.0011374285,0.0014728422,0.0455171],"category_scores_gemma":[0.0015305934,0.00036210247,0.00044804392,0.004802988,0.0017528431,0.0065774564,0.002189241,0.002455051,0.013483661],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011510475,0.000044408524,0.00015354085,0.0009399981,0.000005145427,0.00020202235,0.0021386608,0.00080053555,0.00080375007,0.4376835,0.10292553,0.45429146],"study_design_scores_gemma":[0.0000016129195,0.000009560284,0.00014262175,0.00051134266,0.000002195498,0.00025306974,0.000355454,0.00015471039,0.00015971003,0.015204146,0.98320043,0.0000051533107],"about_ca_topic_score_codex":0.002028947,"about_ca_topic_score_gemma":0.003672797,"teacher_disagreement_score":0.0455171,"about_ca_system_score_codex":0.0032624265,"about_ca_system_score_gemma":0.0027666735,"threshold_uncertainty_score":0.15226984},"labels":[],"label_agreement":null},{"id":"W2729889382","doi":"10.18260/1-2--11886","title":"Using Computer Simulation To Teach Technical Aspects Of Construction In A Liberal Arts Setting","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Liberal arts education; Curriculum; Session (web analytics); Reading (process); Mathematics education; The arts; Vocational education; Engineering education; Liberal education; Computer science; Engineering ethics; Engineering; Engineering management; Pedagogy; Sociology; Higher education; Psychology; Political science; World Wide Web; Law","score_opus":0.02141888291545729,"score_gpt":0.2523638229465474,"score_spread":0.23094494003109012,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2729889382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.353351,0.0010510905,0.47622186,0.002045566,0.00044425638,0.0014598015,0.00051813514,0.0020027221,0.16290553],"genre_scores_gemma":[0.7335624,0.0015072802,0.23940282,0.00028596862,0.000047660524,0.0013314327,0.00052973034,0.00015333299,0.02317937],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996605,0.00016127476,0.000015263764,0.000032838936,0.00008950494,0.00004068024],"domain_scores_gemma":[0.9987509,0.0009641887,0.00002996635,0.000072252216,0.00006643844,0.00011618263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007482151,0.0008402214,0.00035965093,0.0005416199,0.0005996316,0.0014886927,0.00089507556,0.0012653659,0.0072191427],"category_scores_gemma":[0.001780526,0.00035751399,0.00050103816,0.00054871745,0.0007213428,0.0008669697,0.0009765774,0.0012419033,0.0008106738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004746372,0.002220176,0.0059765084,0.0004088918,0.00005464383,0.0004564059,0.0019311872,0.80969894,0.01446491,0.037826613,0.007381963,0.11910522],"study_design_scores_gemma":[0.00028264424,0.0008087223,0.0021462848,0.00015618492,0.000028753622,0.00018230983,0.0006599384,0.9017568,0.011270464,0.025288692,0.057351556,0.000067639645],"about_ca_topic_score_codex":0.003036602,"about_ca_topic_score_gemma":0.0053694937,"teacher_disagreement_score":0.0072191427,"about_ca_system_score_codex":0.000946994,"about_ca_system_score_gemma":0.0014194227,"threshold_uncertainty_score":0.024150431},"labels":[],"label_agreement":null},{"id":"W2731290591","doi":"10.1016/j.aei.2017.06.005","title":"A method for clustering unlabeled BIM objects using entropy and TF-IDF with RDF encoding","year":2017,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Computer science; RDF; Cluster analysis; tf–idf; Information model; Data mining; Entropy (arrow of time); Information retrieval; Database; Artificial intelligence; Engineering; Term (time); Semantic Web","score_opus":0.009529279703391041,"score_gpt":0.24410464314865013,"score_spread":0.2345753634452591,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731290591","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024119052,0.0001474004,0.9945269,0.000056441357,0.000041128114,0.00007077415,0.00056844903,0.0015335015,0.000643382],"genre_scores_gemma":[0.04334451,0.00021623366,0.9490545,0.00006975367,0.00007126904,0.0002096662,0.004340762,0.00029415605,0.0023991172],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9981201,0.00026453132,0.00016650402,0.00047715715,0.0008101038,0.00016161549],"domain_scores_gemma":[0.9985942,0.00042789488,0.000076466786,0.00028269234,0.00057461334,0.00004416333],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019343097,0.0011256991,0.0015165652,0.0060552373,0.001430816,0.0018101016,0.0018556366,0.0012998687,0.0032105776],"category_scores_gemma":[0.0037635467,0.00069916155,0.0017027557,0.0050034453,0.00077077484,0.0024382144,0.0018406563,0.0014394918,0.00293951],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002036401,0.00016060233,0.0013759506,0.00021179905,0.00010431037,0.0001447637,0.00028649086,0.020516396,0.019047592,0.016012449,0.010472647,0.93146336],"study_design_scores_gemma":[0.000049554437,0.00008694155,0.002677747,0.00011743016,0.000121182304,0.0006499378,0.00036485388,0.88791215,0.04072095,0.039512068,0.027664833,0.00012236476],"about_ca_topic_score_codex":0.014651258,"about_ca_topic_score_gemma":0.018946134,"teacher_disagreement_score":0.014651258,"about_ca_system_score_codex":0.0013077628,"about_ca_system_score_gemma":0.0018334725,"threshold_uncertainty_score":0.029131949},"labels":[],"label_agreement":null},{"id":"W2731633638","doi":"10.4050/f-0073-2017-12087","title":"Integrated Hybrid Structural Management System (IHSMS) - Usage and Loads Monitoring","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lockheed Martin (Canada)","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.009909695440013059,"score_gpt":0.21342762551807856,"score_spread":0.2035179300780655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2731633638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35324708,0.0001642467,0.5953935,0.00037272074,0.000102528415,0.00039109626,0.0012750915,0.014486809,0.034566864],"genre_scores_gemma":[0.8782989,0.0000772622,0.11455106,0.00007689188,0.000020566102,0.00013168438,0.0011461835,0.00012844417,0.005569031],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99926287,0.000098136414,0.000025575255,0.00010570202,0.00043498067,0.00007263408],"domain_scores_gemma":[0.9993531,0.000087980385,0.00008187671,0.00021516287,0.00020562788,0.000056278557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009930085,0.00042076327,0.00034607772,0.000726356,0.00030156018,0.0007570317,0.0006728544,0.0003719616,0.0030521676],"category_scores_gemma":[0.0008252512,0.00021455403,0.00019405324,0.00047294595,0.00042814255,0.0012215466,0.0011809428,0.00039949996,0.0007030228],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005504428,0.00049867696,0.028613523,0.00022710183,0.00009341579,0.00016995861,0.00058856315,0.1188348,0.12624638,0.013880931,0.011459697,0.69883657],"study_design_scores_gemma":[0.0001687324,0.0023581162,0.062104896,0.00009434048,0.00008770325,0.0004613708,0.0005398381,0.7440881,0.10906879,0.007827526,0.07308154,0.000119068434],"about_ca_topic_score_codex":0.0014537334,"about_ca_topic_score_gemma":0.0033868768,"teacher_disagreement_score":0.0030521676,"about_ca_system_score_codex":0.0005283595,"about_ca_system_score_gemma":0.0009544216,"threshold_uncertainty_score":0.010210514},"labels":[],"label_agreement":null},{"id":"W2736183088","doi":"10.5539/mas.v11n8p47","title":"An Educational Tool based on Virtual Construction Site Visit Game","year":2017,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Process (computing); SAFER; Quality (philosophy); Domain (mathematical analysis); Active learning (machine learning); Architecture; Human–computer interaction; Engineering management; Multimedia; Engineering; Artificial intelligence","score_opus":0.00807803237893988,"score_gpt":0.23229083759216038,"score_spread":0.22421280521322048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2736183088","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18781991,0.00060700194,0.73035115,0.00043719166,0.0003555048,0.0033795072,0.0012247729,0.02568322,0.050141774],"genre_scores_gemma":[0.42838016,0.00056016666,0.52512133,0.00036938422,0.00007469059,0.0033591706,0.0015274286,0.0007098534,0.039897833],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996519,0.00008350857,0.000021836722,0.000062625666,0.00012187399,0.000058293765],"domain_scores_gemma":[0.99962354,0.00017900676,0.000022426253,0.00003833781,0.000040417523,0.00009628183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036619155,0.0010671275,0.00056939805,0.0010916616,0.00033466442,0.0007861257,0.0014034155,0.0007958695,0.008392794],"category_scores_gemma":[0.001063934,0.0003295169,0.0006202089,0.00037118758,0.0003265245,0.00090327894,0.0015905723,0.00064991094,0.0014955876],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017555034,0.0056374595,0.007562649,0.0020541302,0.00013741093,0.0023821145,0.0028474054,0.017134741,0.1812174,0.027520094,0.036909018,0.7148421],"study_design_scores_gemma":[0.0019145653,0.007372109,0.044413015,0.0007861393,0.00043870017,0.008489616,0.0011453672,0.2859122,0.123078,0.017685166,0.50809014,0.00067498087],"about_ca_topic_score_codex":0.0005641475,"about_ca_topic_score_gemma":0.0008901542,"teacher_disagreement_score":0.008392794,"about_ca_system_score_codex":0.00019250372,"about_ca_system_score_gemma":0.00049703434,"threshold_uncertainty_score":0.028076649},"labels":[],"label_agreement":null},{"id":"W2740039981","doi":"10.2495/sdp-v13-n1-49-61","title":"The role of BIM for safety and security management","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Security management; Process management; Construction engineering; Risk analysis (engineering); Engineering management; Engineering; Computer science; Computer security","score_opus":0.004418400734150634,"score_gpt":0.21363017138485105,"score_spread":0.2092117706507004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740039981","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009449976,0.0077473023,0.8774639,0.00548779,0.00066289445,0.00019011053,0.00050052884,0.0011493355,0.097348295],"genre_scores_gemma":[0.2821348,0.012765427,0.6861473,0.0009745995,0.0005285729,0.00039156998,0.0013145235,0.00042145,0.015321803],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99028945,0.0041852165,0.00057659176,0.00076385634,0.0037196246,0.00046535497],"domain_scores_gemma":[0.996482,0.001006641,0.00027885364,0.00089885184,0.0011157183,0.00021799108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061873607,0.0014323968,0.0009269994,0.0054771286,0.0019214848,0.0101149455,0.0027560885,0.0025817452,0.004660659],"category_scores_gemma":[0.0059070354,0.00062496983,0.001140268,0.0046535307,0.0037819545,0.008527833,0.007169259,0.0020961154,0.0023355403],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049516762,0.000080637445,0.001537492,0.0007978578,0.00008714672,0.00033384172,0.0015607764,0.033507302,0.004474022,0.65502673,0.009391955,0.29315266],"study_design_scores_gemma":[0.000019657526,0.00013767833,0.0021871815,0.0015353438,0.00014051046,0.0012865395,0.0024338954,0.06825283,0.007162098,0.41154543,0.50513536,0.00016345871],"about_ca_topic_score_codex":0.0021885128,"about_ca_topic_score_gemma":0.0011850309,"teacher_disagreement_score":0.0101149455,"about_ca_system_score_codex":0.0023974788,"about_ca_system_score_gemma":0.0042624846,"threshold_uncertainty_score":0.032722294},"labels":[],"label_agreement":null},{"id":"W2740118187","doi":"10.2495/sdp-v13-n1-62-72","title":"Enhancing learning outcomes by introducing BIM in civil engineering studies – experiences from a university college in Norway","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Civil engineering; Engineering management; Engineering ethics; Architectural engineering; Construction engineering","score_opus":0.006388667193519865,"score_gpt":0.2148709632356418,"score_spread":0.20848229604212196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740118187","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99097997,0.00018220686,0.0003864381,0.0003532824,0.000036531423,0.000044407654,0.000025047528,0.000022875238,0.007969287],"genre_scores_gemma":[0.99364096,0.00025387498,0.0008923722,0.00011443292,0.000012992429,0.000028886632,0.00003896887,0.000024042944,0.0049934457],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99626863,0.0015147569,0.00013760965,0.0004994576,0.0006590131,0.0009204627],"domain_scores_gemma":[0.9955165,0.0012195465,0.00030360126,0.00020313101,0.00048549502,0.0022718322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046882597,0.00055060955,0.00064360094,0.0008291451,0.0051265154,0.0040277313,0.0014973732,0.00087128597,0.0060304715],"category_scores_gemma":[0.0038847516,0.00036054468,0.00040831958,0.001100341,0.0034719903,0.0022131454,0.0063387984,0.0010305429,0.0009510326],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036781412,0.0053093107,0.04591858,0.00035477543,0.000015081543,0.004729996,0.83102745,0.0010975342,0.0056093917,0.0029910791,0.0051485174,0.09743043],"study_design_scores_gemma":[0.00005093457,0.0015838828,0.07738138,0.0003394924,0.0000186915,0.0007924132,0.82727826,0.0009696663,0.0030294054,0.000999294,0.08745938,0.00009727455],"about_ca_topic_score_codex":0.016552843,"about_ca_topic_score_gemma":0.047598418,"teacher_disagreement_score":0.016552843,"about_ca_system_score_codex":0.0047759293,"about_ca_system_score_gemma":0.0047328635,"threshold_uncertainty_score":0.034651935},"labels":[],"label_agreement":null},{"id":"W2740384963","doi":"","title":"Integration of Data and Processes of AEC Projects Using the Industry Foundation Classes","year":2005,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interoperability; Software deployment; System integration; Systems engineering; Data exchange; Engineering; Engineering management; Project management; Computer science; Software engineering; Database; World Wide Web","score_opus":0.05777940166266098,"score_gpt":0.2888420883696197,"score_spread":0.23106268670695873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740384963","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0534676,0.00016821694,0.905084,0.0004546967,0.0000766133,0.00050043745,0.002273387,0.008678979,0.02929617],"genre_scores_gemma":[0.25922823,0.00034782488,0.7160705,0.00013685945,0.00004729353,0.0006355328,0.011079404,0.001700881,0.010753462],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9948749,0.00090370124,0.0007630876,0.0007429834,0.0023883872,0.00032706285],"domain_scores_gemma":[0.9945938,0.0013593478,0.00050844287,0.0020358926,0.0013224736,0.00018007119],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038495937,0.0004494701,0.0006590422,0.003115155,0.0009181813,0.0056407717,0.0012803954,0.0008466549,0.0031409438],"category_scores_gemma":[0.008882196,0.00058782386,0.0009912683,0.003588561,0.0007863452,0.004863296,0.0025036882,0.0019232259,0.0010301984],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004219468,0.0006825926,0.02557421,0.0003630017,0.000109414665,0.000424116,0.004945107,0.036120653,0.011563595,0.30728647,0.016990686,0.5955182],"study_design_scores_gemma":[0.000105574385,0.0001584291,0.017357133,0.00026564364,0.00012700439,0.0006712544,0.0013442748,0.22434387,0.039695196,0.07986072,0.63587624,0.00019459479],"about_ca_topic_score_codex":0.014529105,"about_ca_topic_score_gemma":0.011298926,"teacher_disagreement_score":0.014529105,"about_ca_system_score_codex":0.0026364217,"about_ca_system_score_gemma":0.004452349,"threshold_uncertainty_score":0.02888906},"labels":[],"label_agreement":null},{"id":"W2740586905","doi":"10.2495/sdp-v13-n1-73-83","title":"Using BIM models for the design of large rail infrastructure projects: key factors for a successful implementation","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":25,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Key (lock); Building information modeling; Construction engineering; Transport engineering; Systems engineering; Engineering; Computer science; Business; Process management; Operations management; Computer security","score_opus":0.03661727406135868,"score_gpt":0.30262833926179106,"score_spread":0.2660110652004324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740586905","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048993845,0.0014018302,0.9084767,0.0036578919,0.00010872729,0.0009881806,0.0002335076,0.0011223532,0.035016995],"genre_scores_gemma":[0.26179543,0.0009838653,0.73311543,0.0001721045,0.000027127464,0.00087307324,0.00037594023,0.00038994895,0.0022671046],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9669858,0.016746499,0.0019683293,0.001199785,0.012018722,0.0010809043],"domain_scores_gemma":[0.97561467,0.012034853,0.0022543892,0.004436183,0.005097277,0.0005626449],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.030562602,0.001784253,0.00090400176,0.0034797965,0.002032684,0.008800009,0.0021800532,0.0026561173,0.0042346166],"category_scores_gemma":[0.048767403,0.0017558485,0.0013735043,0.0037786178,0.0024995985,0.008926254,0.0055149803,0.0028498662,0.0027005905],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021934285,0.0007668079,0.014627795,0.0020800857,0.0001661056,0.00068213337,0.010540558,0.35933954,0.016677452,0.17989865,0.006182815,0.4088186],"study_design_scores_gemma":[0.00020156198,0.0011799303,0.017498551,0.0041365107,0.00030821827,0.0013867804,0.0127318585,0.49142253,0.021653578,0.16982289,0.27906168,0.00059586973],"about_ca_topic_score_codex":0.004225843,"about_ca_topic_score_gemma":0.006988845,"teacher_disagreement_score":0.030562602,"about_ca_system_score_codex":0.0035175537,"about_ca_system_score_gemma":0.008587848,"threshold_uncertainty_score":0.16163236},"labels":[],"label_agreement":null},{"id":"W2740950201","doi":"10.2495/sdp-v13-n1-24-35","title":"Implementing a BIM collaborative workflow in the UK construction market","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Building information modeling; Business; Construction engineering; Process management; Engineering; Computer science; Operations management; Database","score_opus":0.007170011977266574,"score_gpt":0.23697621337003402,"score_spread":0.22980620139276745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2740950201","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.75714284,0.00037195935,0.13032755,0.010088042,0.00019953246,0.0017204054,0.00020825428,0.0011094058,0.0988319],"genre_scores_gemma":[0.87351096,0.00030301328,0.11199117,0.00030084964,0.000024407487,0.00058625196,0.00027363558,0.00013793066,0.012871826],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9859346,0.007049721,0.0007391699,0.0010355888,0.0030879374,0.002152913],"domain_scores_gemma":[0.9897404,0.0043372978,0.0009190693,0.001749638,0.0020597614,0.0011937094],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023641469,0.0004719039,0.0004933054,0.0021346798,0.0070660533,0.010550832,0.0030215369,0.0040718117,0.00510189],"category_scores_gemma":[0.016647436,0.0008477067,0.00062304677,0.0035051752,0.0045426106,0.011036932,0.006971773,0.0020413334,0.0016246778],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006505622,0.0021954065,0.016714683,0.0007872613,0.000052583204,0.007485268,0.12785888,0.063446015,0.011632571,0.24134745,0.024902554,0.50292677],"study_design_scores_gemma":[0.00043974142,0.001621777,0.026407374,0.0011349124,0.00008510447,0.002391837,0.20302631,0.17239606,0.015777046,0.0829214,0.49303246,0.000765983],"about_ca_topic_score_codex":0.030877309,"about_ca_topic_score_gemma":0.040717226,"teacher_disagreement_score":0.030877309,"about_ca_system_score_codex":0.014439939,"about_ca_system_score_gemma":0.021272698,"threshold_uncertainty_score":0.1250295},"labels":[],"label_agreement":null},{"id":"W2741022164","doi":"10.2495/sdp-v13-n1-139-150","title":"Investigating benefits and criticisms of BIM for construction scheduling in SMES: An Italian case study","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scheduling (production processes); Business; Architectural engineering; Construction engineering; Operations management; Computer science; Process management; Engineering; Operations research; Risk analysis (engineering); Environmental economics; Economics","score_opus":0.024193725942218268,"score_gpt":0.27705826179947163,"score_spread":0.2528645358572534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741022164","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.977433,0.00029675924,0.0050450796,0.0012431174,0.000017752245,0.00014016802,0.00008420744,0.000029410785,0.015710551],"genre_scores_gemma":[0.9951137,0.00034462565,0.0032441,0.00009362724,0.00001012252,0.00008089243,0.00004247765,0.000011838634,0.001058696],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99437284,0.0039651156,0.00029247988,0.00024255665,0.0007334663,0.00039346173],"domain_scores_gemma":[0.9900693,0.006889507,0.00087768194,0.0008710964,0.0009173394,0.00037513618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075274054,0.0003549165,0.00035660857,0.0014003129,0.0021105814,0.0021418964,0.0009985903,0.0016706468,0.0019377207],"category_scores_gemma":[0.013403678,0.00022677853,0.00048048657,0.0030876466,0.0019841895,0.0010298608,0.0021514578,0.0008154813,0.00036765178],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024099825,0.0036793132,0.2866073,0.003011273,0.00019025571,0.055979557,0.26470566,0.055457473,0.0178786,0.06437481,0.01124351,0.23446226],"study_design_scores_gemma":[0.00036165514,0.0045121135,0.28825492,0.0027513022,0.00042537117,0.010416696,0.4305071,0.06936914,0.020201411,0.011822861,0.1610691,0.00030836463],"about_ca_topic_score_codex":0.009770396,"about_ca_topic_score_gemma":0.015933555,"teacher_disagreement_score":0.009770396,"about_ca_system_score_codex":0.0034718304,"about_ca_system_score_gemma":0.0017430028,"threshold_uncertainty_score":0.039809227},"labels":[],"label_agreement":null},{"id":"W2741242532","doi":"10.2495/sdp-v13-n1-84-95","title":"BIM – Towards the entire lifecycle","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"System lifecycle; Application lifecycle management; Business; Process management; Systems engineering; Product lifecycle; Environmental resource management; Computer science; Engineering; Environmental science; Marketing; New product development","score_opus":0.011679923045136648,"score_gpt":0.2315935351688054,"score_spread":0.21991361212366875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741242532","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005737725,0.039585497,0.803167,0.033204384,0.0027440863,0.0003177847,0.0011485675,0.0046688076,0.10942612],"genre_scores_gemma":[0.06764821,0.04738667,0.8357404,0.0052324105,0.0013338417,0.0005950607,0.005419358,0.0023041675,0.034339868],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.98718333,0.005074213,0.0006694573,0.0009601228,0.0055238055,0.00058904244],"domain_scores_gemma":[0.99366415,0.0013848095,0.00023859023,0.001865176,0.0022260859,0.0006212189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015118504,0.0017621331,0.0013070636,0.004462703,0.0020633708,0.013243382,0.0041309027,0.004319523,0.007195992],"category_scores_gemma":[0.011095303,0.0014669829,0.0016591721,0.005128831,0.005454151,0.017755907,0.013985671,0.0060746768,0.0070204493],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049307004,0.00008226714,0.00064906885,0.00074833725,0.0000600035,0.0002033525,0.0021351133,0.0054780236,0.0015134967,0.6595743,0.05621379,0.27329308],"study_design_scores_gemma":[0.0000065305294,0.000019993196,0.0002715329,0.0006755528,0.000013048849,0.00024971424,0.0005803362,0.003320065,0.00075705955,0.17611474,0.8179649,0.000026406125],"about_ca_topic_score_codex":0.0036473626,"about_ca_topic_score_gemma":0.0017544668,"teacher_disagreement_score":0.015118504,"about_ca_system_score_codex":0.0029622905,"about_ca_system_score_gemma":0.0072357194,"threshold_uncertainty_score":0.07995528},"labels":[],"label_agreement":null},{"id":"W2741576914","doi":"10.2495/sdp-v13-n1-1-11","title":"Building information modelling in operations of maintenance at the university of Alicante","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universidad de Alicante","keywords":"Civil engineering; Environmental science; Computer science; Transport engineering; Engineering","score_opus":0.007543946305218075,"score_gpt":0.20044717284081864,"score_spread":0.19290322653560057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741576914","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67586887,0.0023744034,0.21357876,0.0032739998,0.00012170569,0.0004040052,0.0031480885,0.0018382315,0.09939189],"genre_scores_gemma":[0.94322085,0.0010188348,0.047158338,0.00003669234,0.000008096471,0.00010594048,0.0013099263,0.0000606627,0.0070806723],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9991211,0.0002966382,0.000065050255,0.00010952015,0.00026801226,0.00013967101],"domain_scores_gemma":[0.9992386,0.0003248896,0.00010375266,0.00011231311,0.00017654797,0.00004397607],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010071382,0.0005107608,0.00034109614,0.0018304591,0.0012003004,0.0041501517,0.0008047344,0.0012009048,0.0067071603],"category_scores_gemma":[0.002073566,0.00032693625,0.00042066383,0.0033251261,0.00052047806,0.0017515486,0.0013169346,0.00068366976,0.0007643408],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003743206,0.00034701967,0.036722057,0.00071611936,0.000046846046,0.0013614489,0.005555874,0.58564943,0.006838171,0.051483057,0.0069719544,0.30393365],"study_design_scores_gemma":[0.000042676827,0.00019169816,0.050989207,0.00059305376,0.00008950306,0.00044347628,0.011434694,0.7968104,0.0059672156,0.020583792,0.11271327,0.00014096597],"about_ca_topic_score_codex":0.09136522,"about_ca_topic_score_gemma":0.09010204,"teacher_disagreement_score":0.09136522,"about_ca_system_score_codex":0.0044894414,"about_ca_system_score_gemma":0.005190097,"threshold_uncertainty_score":0.18166685},"labels":[],"label_agreement":null},{"id":"W2741962626","doi":"10.2495/sdp-v13-n1-151-159","title":"BIM and genetic algorithm optimisation for sustainable building envelope design","year":2018,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universiti Teknologi Malaysia; Ministério da Ciência, Tecnologia e Inovação; Kementerian Sains, Teknologi dan Inovasi; Ministry of Higher Education, Malaysia","keywords":"Building information modeling; Building envelope; Sustainability; Genetic algorithm; Envelope (radar); Process (computing); Building design; Building model; Engineering; Design tool; Sustainable design; Computer science; Systems engineering; Architectural engineering; Simulation; Thermal; Mechanical engineering; Machine learning; Operations management","score_opus":0.013325720960766086,"score_gpt":0.23855505703326707,"score_spread":0.22522933607250098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2741962626","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021731831,0.00054965063,0.9661877,0.00013541253,0.000043447064,0.00007323009,0.00009762314,0.00037763306,0.010803485],"genre_scores_gemma":[0.36691624,0.0006623749,0.6274103,0.00007726968,0.000023941711,0.00038514496,0.000339057,0.00015945386,0.004026221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994148,0.0002467849,0.000020014002,0.000060467442,0.00021338786,0.000044511886],"domain_scores_gemma":[0.9995702,0.00025223402,0.000035825193,0.000039091345,0.00008716509,0.000015341742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001324121,0.000746462,0.00079853856,0.0013187709,0.0004209432,0.0011071444,0.0008318761,0.0010679705,0.0022733503],"category_scores_gemma":[0.0020859365,0.0005290194,0.0009839911,0.0015611174,0.0005184601,0.0007328573,0.0010092205,0.00071665365,0.00048929267],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014022751,0.000017538474,0.0002499715,0.000034429886,0.0000148718245,0.000017355449,0.000019152576,0.9715256,0.00066287606,0.0052566547,0.00021980777,0.021967592],"study_design_scores_gemma":[0.0000043014334,0.000009398501,0.000099009034,0.000007834654,0.0000039171346,0.000008604093,0.0000069352564,0.99608755,0.00039639306,0.0023013058,0.0010709092,0.00000390727],"about_ca_topic_score_codex":0.00452795,"about_ca_topic_score_gemma":0.0034392723,"teacher_disagreement_score":0.00452795,"about_ca_system_score_codex":0.0009255674,"about_ca_system_score_gemma":0.0013714248,"threshold_uncertainty_score":0.009003222},"labels":[],"label_agreement":null},{"id":"W2744206887","doi":"","title":"Data-Driven Scenario Generation for Enhanced Realism of Equipment Training Simulators","year":2017,"lang":"en","type":"article","venue":"University of Twente Research Information","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Training (meteorology); Virtual reality; Computer science; Dynamism; Popularity; Carving; Heavy equipment; Risk analysis (engineering); Simulation; Engineering management; Human–computer interaction; Engineering","score_opus":0.16552962067498364,"score_gpt":0.3324728220942302,"score_spread":0.16694320141924654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2744206887","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03166523,0.00020302781,0.9574236,0.0003034722,0.00012982903,0.00053860596,0.0013977145,0.004234337,0.0041041677],"genre_scores_gemma":[0.5029228,0.00026275025,0.48839182,0.00015669872,0.000033441156,0.00068093115,0.0050212955,0.00057574734,0.0019545516],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993844,0.00019772472,0.000040135248,0.00012083166,0.00020123128,0.000055662153],"domain_scores_gemma":[0.99874985,0.00068144576,0.000065929264,0.0001809896,0.00023077286,0.000090984555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009781492,0.0010771808,0.0006180592,0.00083120575,0.00030056507,0.001045114,0.001763541,0.0009146054,0.004834218],"category_scores_gemma":[0.003919989,0.00056518195,0.001004702,0.0005133298,0.00039482754,0.0009474154,0.0019672578,0.0012618401,0.0008708817],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004556318,0.0002564538,0.0022685395,0.00035435165,0.00009534481,0.00060205004,0.00040638162,0.872244,0.016098332,0.010562589,0.0071047563,0.08955153],"study_design_scores_gemma":[0.000030237241,0.000038842423,0.0002000622,0.000011904344,0.000008792896,0.00004557148,0.00003732868,0.99106115,0.0028129364,0.0029555566,0.0027868792,0.0000108379645],"about_ca_topic_score_codex":0.0026183508,"about_ca_topic_score_gemma":0.0036295904,"teacher_disagreement_score":0.004834218,"about_ca_system_score_codex":0.0005360791,"about_ca_system_score_gemma":0.00069544086,"threshold_uncertainty_score":0.016172051},"labels":[],"label_agreement":null},{"id":"W2745822044","doi":"10.1007/978-3-319-66805-5_23","title":"Research Issues in Attempting to Support an Architecture Firm Transition from Fragmented CAD to BIM Collaborative Design","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Multidisciplinary approach; Computer science; Knowledge management; Architecture; Originality; Engineering management; CAD; Process management; Systems engineering; Engineering; Sociology; Qualitative research","score_opus":0.036752794071263195,"score_gpt":0.3107328956839023,"score_spread":0.2739801016126391,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2745822044","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3594389,0.0077301045,0.08894418,0.20698103,0.0014071976,0.00095482136,0.00023471078,0.00044686365,0.33386213],"genre_scores_gemma":[0.8963152,0.0034439578,0.071564645,0.0038297484,0.00013981435,0.00042925417,0.00021723441,0.00010990798,0.023950143],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9770865,0.012712267,0.0009777822,0.0017392726,0.004769324,0.0027148833],"domain_scores_gemma":[0.96279925,0.021161854,0.0015509609,0.003061986,0.007945848,0.0034800821],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.038383085,0.0004007975,0.0004308077,0.0015080953,0.0066375462,0.024273591,0.00534804,0.0053211474,0.015349342],"category_scores_gemma":[0.044741057,0.0006503224,0.000547568,0.0037264659,0.0054105604,0.018072398,0.0052232444,0.0056161815,0.0025419248],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033832225,0.001928798,0.0111783855,0.0010534415,0.000061528,0.00060922164,0.03935394,0.0058632684,0.0041557555,0.56762594,0.015838837,0.35199255],"study_design_scores_gemma":[0.00017843745,0.0014077909,0.017418182,0.002894556,0.000118171156,0.0009135413,0.39507526,0.02402923,0.0131357,0.24635346,0.2982948,0.00018081738],"about_ca_topic_score_codex":0.011450588,"about_ca_topic_score_gemma":0.013751649,"teacher_disagreement_score":0.9933624,"about_ca_system_score_codex":0.008796986,"about_ca_system_score_gemma":0.026496286,"threshold_uncertainty_score":0.20299155},"labels":[],"label_agreement":null},{"id":"W2746274752","doi":"10.1016/j.proeng.2017.08.017","title":"Method to Enable LCA Analysis through Each Level of Development of a BIM Model","year":2017,"lang":"en","type":"article","venue":"Procedia Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; École de Technologie Supérieure","funders":"Hydro-Québec","keywords":"Building information modeling; Life-cycle assessment; Information model; Engineering; Computer science; Data model (GIS); Systems engineering; Database; Production (economics); Operations management; Artificial intelligence","score_opus":0.06305483547226176,"score_gpt":0.28742425542208255,"score_spread":0.2243694199498208,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2746274752","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008317178,0.000022895121,0.9921336,0.000076301134,0.000051610452,0.00016675287,0.00047969323,0.0035249523,0.0027124197],"genre_scores_gemma":[0.012464655,0.000057836944,0.98277456,0.00004608794,0.000010897337,0.0004977443,0.0012782114,0.00052069017,0.0023493443],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979761,0.0003238111,0.00023528794,0.00041753222,0.000945003,0.000102317696],"domain_scores_gemma":[0.99647,0.0006990924,0.00019042214,0.0012413757,0.0012966376,0.00010243898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028344737,0.0011427422,0.0005192289,0.003045328,0.0007584839,0.0033672317,0.0019972108,0.0009686619,0.015095056],"category_scores_gemma":[0.007576503,0.0009253624,0.0011494976,0.002078358,0.0007426795,0.0030260866,0.0033940503,0.001500735,0.008212648],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024900373,0.00032935233,0.00507129,0.00095096976,0.00013101842,0.00055459153,0.0015700134,0.022337144,0.051593788,0.1623569,0.04103441,0.71382153],"study_design_scores_gemma":[0.0001290695,0.00014925135,0.0025601687,0.00037121467,0.00010590018,0.0012965138,0.0009115448,0.33099946,0.13997385,0.056614168,0.4666696,0.0002193558],"about_ca_topic_score_codex":0.0017939995,"about_ca_topic_score_gemma":0.001955696,"teacher_disagreement_score":0.015095056,"about_ca_system_score_codex":0.00067298335,"about_ca_system_score_gemma":0.0022610247,"threshold_uncertainty_score":0.05049801},"labels":[],"label_agreement":null},{"id":"W2747572841","doi":"10.1007/978-3-319-66805-5_21","title":"Digital Synchronous Collaboration Workspace and 3D Interactions for an AEC Project. Decision-Making Scenario Evaluation","year":2017,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Agence Nationale de la Recherche","keywords":"Session (web analytics); Workspace; Multidisciplinary approach; Architecture; Adaptation (eye); Computer science; Engineering management; Systems engineering; Process management; Engineering; Knowledge management; World Wide Web","score_opus":0.018571225497222572,"score_gpt":0.29600973639956957,"score_spread":0.277438510902347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2747572841","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53627074,0.0014204406,0.26278266,0.00075276685,0.0001878777,0.0013361225,0.0011598894,0.0010841601,0.19500534],"genre_scores_gemma":[0.90952635,0.00037372703,0.07515188,0.000026513058,0.000012374162,0.00047380422,0.0005008428,0.000075515636,0.01385902],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99782854,0.0014740669,0.000062613646,0.00011581791,0.0004174408,0.000101614336],"domain_scores_gemma":[0.9976445,0.0015409804,0.000099709454,0.00020994818,0.0003494856,0.00015540485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024087215,0.00059210014,0.00026307348,0.0012781023,0.00086775026,0.002179656,0.0008963533,0.0010048476,0.015837934],"category_scores_gemma":[0.005471101,0.0002471294,0.00036478494,0.0011817787,0.0006015701,0.0022121063,0.0021066915,0.0004417245,0.0013156044],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0023209408,0.00176643,0.006362627,0.0012345589,0.000053158285,0.0011351769,0.012184699,0.064472295,0.026364258,0.08210989,0.016382286,0.7856137],"study_design_scores_gemma":[0.000630391,0.0042323177,0.04542155,0.0018898073,0.00033945462,0.002000098,0.032127343,0.5267838,0.08995627,0.09610525,0.20013362,0.0003799977],"about_ca_topic_score_codex":0.0023074448,"about_ca_topic_score_gemma":0.0035075194,"teacher_disagreement_score":0.015837934,"about_ca_system_score_codex":0.0010343879,"about_ca_system_score_gemma":0.0012422866,"threshold_uncertainty_score":0.052983165},"labels":[],"label_agreement":null},{"id":"W2749766199","doi":"10.11159/rtese17.109","title":"Development of a Model for Energy Management Decisions in Refurbishment of Buildings","year":2017,"lang":"en","type":"article","venue":"Proceedings of the International Conference of Recent Trends in Environmental Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Architectural engineering; Computer science; Facility management; Construction engineering; Systems engineering; Engineering; Business","score_opus":0.03220794864399251,"score_gpt":0.24463820448459317,"score_spread":0.21243025584060066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2749766199","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08828504,0.00023473006,0.8723981,0.001389284,0.00014275778,0.00026008653,0.0012201311,0.0009763715,0.035093613],"genre_scores_gemma":[0.84430647,0.00031760818,0.14134064,0.000115075156,0.00003976015,0.00039978625,0.00096228975,0.00018028347,0.012338029],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99948454,0.00018575582,0.000033226745,0.00010237506,0.00011025954,0.0000838596],"domain_scores_gemma":[0.9988175,0.0007088409,0.00007540726,0.000065800305,0.0002566375,0.000075920965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011020829,0.00089721626,0.0010470643,0.0008560267,0.0008075674,0.0027741985,0.002741904,0.002205814,0.008516885],"category_scores_gemma":[0.002934762,0.00075071916,0.001277624,0.0008411638,0.00067397597,0.002543447,0.0012181057,0.0014073558,0.0008812127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018455357,0.000031798805,0.00037480413,0.000017023762,0.0000097901975,0.00005416924,0.000033276785,0.98415977,0.00019085001,0.010910778,0.00029737927,0.0039018278],"study_design_scores_gemma":[0.000005000278,0.000005721634,0.000041173418,0.0000036243196,0.0000040097825,0.0000042512233,0.000010472245,0.9967282,0.00009412662,0.0027000655,0.00040021955,0.0000031600064],"about_ca_topic_score_codex":0.04398077,"about_ca_topic_score_gemma":0.030909453,"teacher_disagreement_score":0.04398077,"about_ca_system_score_codex":0.0025124766,"about_ca_system_score_gemma":0.003136022,"threshold_uncertainty_score":0.08744955},"labels":[],"label_agreement":null},{"id":"W2752201218","doi":"10.1016/j.autcon.2017.08.006","title":"Developing owner information requirements for BIM-enabled project delivery and asset management","year":2017,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":199,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Process management; Documentation; Requirements analysis; Asset (computer security); Interoperability; Process (computing); Asset management; Requirements management; Facility management; Integrated project delivery; Usability; Knowledge management; Requirements elicitation; Information model; Systems engineering; Engineering management; Computer science; Project management; Engineering; Business; Software engineering; Operations management; Software","score_opus":0.0240650905787071,"score_gpt":0.2669994118936201,"score_spread":0.242934321314913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2752201218","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07676319,0.000108062566,0.8891988,0.00060744514,0.000040293864,0.00074983184,0.00089898764,0.0015047272,0.030128654],"genre_scores_gemma":[0.54278123,0.00019449274,0.4481018,0.000108988635,0.00001833733,0.0007199873,0.0029477787,0.00061057,0.004516861],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9875493,0.0038365219,0.0009107708,0.00045809208,0.0064513083,0.00079402747],"domain_scores_gemma":[0.9796052,0.010576047,0.0013627975,0.002024925,0.0061367163,0.00029438798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0077386787,0.0008369476,0.0006687195,0.002565373,0.0007100327,0.0027571386,0.0017174524,0.0014802472,0.0045863665],"category_scores_gemma":[0.034599952,0.0011257216,0.00094772375,0.0013371649,0.0006815159,0.004269347,0.0023022199,0.0012564773,0.001661794],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038061917,0.00089416216,0.015672904,0.0011755176,0.000098789795,0.0019963332,0.003581644,0.35772547,0.05660558,0.24435802,0.018209701,0.29930118],"study_design_scores_gemma":[0.000030134173,0.00013926117,0.0036815754,0.00027890602,0.000054397755,0.0004863354,0.0012693292,0.9039871,0.04195458,0.019200826,0.028856905,0.000060585673],"about_ca_topic_score_codex":0.0056965435,"about_ca_topic_score_gemma":0.007865431,"teacher_disagreement_score":0.0077386787,"about_ca_system_score_codex":0.0014994321,"about_ca_system_score_gemma":0.0032496636,"threshold_uncertainty_score":0.040926516},"labels":[],"label_agreement":null},{"id":"W2755056305","doi":"","title":"The ACR: Advanced Design Features for a Short Construction Schedule (S494)","year":2003,"lang":"en","type":"article","venue":"NCSU Libraries Repository (North Carolina State University Libraries)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Schedule; Computer science","score_opus":0.006331406127469621,"score_gpt":0.16391070116881046,"score_spread":0.15757929504134083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2755056305","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070120655,0.00056544907,0.03412817,0.0012974208,0.0027195613,0.0037947975,0.009876609,0.017173318,0.92343265],"genre_scores_gemma":[0.015445026,0.00036781965,0.026524378,0.0003372124,0.00051277573,0.0014723032,0.008178725,0.0041023092,0.94305944],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99831474,0.000172182,0.00008624117,0.0001010224,0.0011440833,0.0001817871],"domain_scores_gemma":[0.995952,0.00027617905,0.00020283341,0.00050563266,0.0021467994,0.00091660646],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0019293838,0.0019284328,0.00064723974,0.0022707647,0.001318995,0.0018144879,0.0014987177,0.001338799,0.630834],"category_scores_gemma":[0.002876393,0.0009842423,0.000705295,0.0012194522,0.0003400205,0.0010023715,0.0016903742,0.0014530994,0.5209102],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001972423,0.00019868428,0.0004390291,0.00017309813,0.000003989198,0.000112935144,0.000051999607,0.00080320076,0.007848132,0.0021795349,0.78591925,0.20207287],"study_design_scores_gemma":[0.000054202894,0.0002401291,0.0018259168,0.000023532195,0.0000029298312,0.00013774878,0.000030301957,0.0004142863,0.000717237,0.00029158028,0.9962483,0.000013833929],"about_ca_topic_score_codex":0.0039841444,"about_ca_topic_score_gemma":0.009542371,"teacher_disagreement_score":0.630834,"about_ca_system_score_codex":0.0011736522,"about_ca_system_score_gemma":0.0036062477,"threshold_uncertainty_score":0.5265705},"labels":[],"label_agreement":null},{"id":"W2756246172","doi":"","title":"Computer Science Building","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.015151511499566575,"score_gpt":0.22205601167830608,"score_spread":0.20690450017873951,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2756246172","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00069178565,0.0003077702,0.0011300289,0.00094251,0.0005217828,0.00006639337,0.005462237,0.0015727261,0.9893048],"genre_scores_gemma":[0.004651203,0.00037124005,0.0010834768,0.00024990473,0.00009017659,0.000040017905,0.0065132575,0.0004241953,0.98657644],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994721,0.000035808698,0.00001600151,0.000114024675,0.00026631495,0.000095834155],"domain_scores_gemma":[0.99892694,0.00006430118,0.00002375616,0.00018153671,0.0004302889,0.00037327362],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00031008563,0.0009756186,0.000686141,0.0014538973,0.0028452359,0.0038070523,0.0006895271,0.00086374406,0.7994071],"category_scores_gemma":[0.0009241773,0.00034964705,0.00038696948,0.0019159673,0.00042095047,0.0011543845,0.001964451,0.0009855519,0.61914617],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027192826,0.000026434904,0.0002762322,0.00004452745,0.000002349758,0.000044207485,0.00002975565,0.000079267775,0.0005077048,0.0058573247,0.94435763,0.04874739],"study_design_scores_gemma":[0.0000041184335,0.000007103336,0.00040267388,0.000010793575,0.0000013579689,0.000032902084,0.00001889869,0.000053466705,0.000117448035,0.00031774753,0.9990308,0.0000026935397],"about_ca_topic_score_codex":0.040671844,"about_ca_topic_score_gemma":0.13018516,"teacher_disagreement_score":0.7994071,"about_ca_system_score_codex":0.0038640758,"about_ca_system_score_gemma":0.0043132585,"threshold_uncertainty_score":0.2861213},"labels":[],"label_agreement":null},{"id":"W2763963636","doi":"10.5281/zenodo.1011129","title":"An Innovative Raft To Boost The Mollusk Farming Industry","year":2017,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Research & Development Corporation","funders":"European Commission","keywords":"Context (archaeology); Tourism; Business; Agriculture; Reinforced concrete; Engineering; Environmental resource management; Environmental science; Geography","score_opus":0.029780416853016804,"score_gpt":0.25563551268047247,"score_spread":0.22585509582745567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2763963636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5035985,0.0029522432,0.35194606,0.0014989611,0.0007270254,0.0003546139,0.00082682655,0.0046111844,0.13348462],"genre_scores_gemma":[0.6685771,0.0017119381,0.26981196,0.00028748653,0.00012872393,0.00015277484,0.0009150062,0.00038732385,0.058027744],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995565,0.000033854867,0.0000071072973,0.000049672115,0.00029066962,0.000062145],"domain_scores_gemma":[0.9998419,0.000014163309,0.000016398153,0.000027412283,0.000056143086,0.00004387846],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032973374,0.00041452964,0.00016583562,0.00078170194,0.00040058108,0.0007991049,0.0005336211,0.00060765276,0.0049687685],"category_scores_gemma":[0.0002488768,0.00013902294,0.00033708953,0.0003878174,0.00025495392,0.0009990204,0.0015314907,0.00044322945,0.0019442276],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002899811,0.0002701398,0.00466418,0.0005145295,0.000046008212,0.0012517421,0.0005078645,0.016528059,0.32954395,0.018385304,0.012914209,0.6150841],"study_design_scores_gemma":[0.00010885376,0.0017349989,0.018999059,0.00025536178,0.00010408029,0.0053370404,0.001061873,0.054179404,0.17556345,0.009472241,0.7330357,0.00014788701],"about_ca_topic_score_codex":0.00058946776,"about_ca_topic_score_gemma":0.0017828082,"teacher_disagreement_score":0.0049687685,"about_ca_system_score_codex":0.00028609426,"about_ca_system_score_gemma":0.00053598,"threshold_uncertainty_score":0.016622186},"labels":[],"label_agreement":null},{"id":"W2765802497","doi":"10.18162/ritpu-2017-v14n2-01","title":"Les enjeux liés à l’intégration de l’approche BIM de modélisation des données du bâtiment à l’enseignement universitaire : cas d’une école d’ingénierie","year":2017,"lang":"fr","type":"article","venue":"Revue internationale des technologies en pédagogie universitaire","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.03668338961680805,"score_gpt":0.2553447994559417,"score_spread":0.21866140983913362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2765802497","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35351112,0.0028729422,0.5228798,0.03093347,0.0004373903,0.00023374916,0.00010286871,0.0006284458,0.08840034],"genre_scores_gemma":[0.79810584,0.0013627246,0.18758321,0.00055447506,0.000089089815,0.00013455664,0.00009950105,0.00022482392,0.0118458085],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9789725,0.010545677,0.0010152084,0.0010812952,0.007103833,0.0012814959],"domain_scores_gemma":[0.9788386,0.01137388,0.001163215,0.0033259247,0.0046746098,0.00062367215],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.030091658,0.0010007594,0.0006878049,0.0022561797,0.0029751118,0.012407677,0.0028311212,0.00469551,0.0038446651],"category_scores_gemma":[0.032825526,0.0013248376,0.0010386711,0.0028204594,0.005201057,0.009650632,0.006496165,0.00374324,0.0006940624],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003682401,0.00066290103,0.05518861,0.00091702765,0.00025853454,0.0026012266,0.038439713,0.068782374,0.01393971,0.36705336,0.0064037265,0.4453845],"study_design_scores_gemma":[0.00010659639,0.0007954764,0.046613574,0.0016000364,0.00039993838,0.006047061,0.072004706,0.365773,0.04747733,0.1742036,0.28451657,0.00046212398],"about_ca_topic_score_codex":0.018461505,"about_ca_topic_score_gemma":0.021461727,"teacher_disagreement_score":0.030091658,"about_ca_system_score_codex":0.003661793,"about_ca_system_score_gemma":0.004629261,"threshold_uncertainty_score":0.15914178},"labels":[],"label_agreement":null},{"id":"W2768018811","doi":"10.4018/ij3dim.2017040102","title":"Minimizing Construction Emissions Using Building Information Modeling and Decision-Making Techniques","year":2017,"lang":"en","type":"article","venue":"International Journal of 3-D Information Modeling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Building information modeling; Greenhouse gas; Multiple-criteria decision analysis; Life-cycle assessment; Order (exchange); Computer science; Environmental impact assessment; Engineering; Operations research; Environmental economics; Operations management; Production (economics); Business; Machine learning","score_opus":0.016067031512932723,"score_gpt":0.28645043827290395,"score_spread":0.27038340675997125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2768018811","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01545314,0.0002840914,0.978734,0.00018745393,0.000015307562,0.0000721168,0.00007617852,0.00013681267,0.0050408943],"genre_scores_gemma":[0.62946576,0.0008523321,0.36695877,0.0000599418,0.000025030247,0.0004271338,0.0002105007,0.000064930704,0.0019356003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998808,0.0005335458,0.00005452905,0.000099976176,0.00039353358,0.000110442554],"domain_scores_gemma":[0.9991862,0.0005247089,0.00009559227,0.000056072888,0.00010946536,0.000027884997],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015142708,0.0013111051,0.0012810699,0.0014129909,0.0006510746,0.002268725,0.0011563578,0.0011588471,0.0014291975],"category_scores_gemma":[0.0019983174,0.0006667236,0.0014695527,0.0019618014,0.00059500284,0.0017491925,0.001375851,0.0008562877,0.00020981667],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013701312,0.000022306633,0.00014430449,0.00004168986,0.000019494748,0.000026013864,0.000028103455,0.9803237,0.00061654823,0.0070451787,0.00012486358,0.011594032],"study_design_scores_gemma":[0.000004289431,0.000014641684,0.00005579068,0.0000116587935,0.000012358647,0.000007822531,0.000016191572,0.99215513,0.00054117054,0.006687639,0.00048591767,0.0000074984864],"about_ca_topic_score_codex":0.0061789686,"about_ca_topic_score_gemma":0.005738868,"teacher_disagreement_score":0.0061789686,"about_ca_system_score_codex":0.0015785078,"about_ca_system_score_gemma":0.0021999308,"threshold_uncertainty_score":0.012286007},"labels":[],"label_agreement":null},{"id":"W2769859124","doi":"10.5539/emr.v7n1p1","title":"A Framework for Building Design Management in an Imperfect BIM Environment","year":2017,"lang":"en","type":"article","venue":"Engineering Management Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Building information modeling; Multidisciplinary approach; Design process; Process management; Software; Scheme (mathematics); Information flow; Computer science; Imperfect; Engineering; Systems engineering; Knowledge management; Engineering management; Operations management; Work in process","score_opus":0.06319024100301474,"score_gpt":0.3370511263560789,"score_spread":0.2738608853530642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2769859124","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007173665,0.00022280084,0.98894453,0.00033665623,0.000036342877,0.00014637521,0.00006405493,0.00056126877,0.008970666],"genre_scores_gemma":[0.03072085,0.0004129281,0.9631833,0.00007489612,0.000041675157,0.00045686445,0.00025357603,0.00012447528,0.0047315047],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9962948,0.001611017,0.00037223217,0.0004966192,0.00094587746,0.00027949366],"domain_scores_gemma":[0.9982249,0.0006136954,0.00017994881,0.00045751402,0.00032190958,0.00020210995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062750205,0.0012028189,0.0008433022,0.0034185199,0.0021585987,0.0080939215,0.004675188,0.0028109376,0.008025834],"category_scores_gemma":[0.005021819,0.0010466051,0.0024015503,0.0027662814,0.004366783,0.006326793,0.006737439,0.0028762794,0.002724485],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013243564,0.00003823924,0.0002491085,0.00012256631,0.000018717503,0.00024211039,0.00093495764,0.016013686,0.00049352425,0.95539564,0.0017424882,0.024735628],"study_design_scores_gemma":[0.000032365504,0.00007028545,0.00031271673,0.00039673824,0.000054648233,0.00054543867,0.0010247288,0.19044259,0.001068827,0.58806187,0.21792017,0.00006947707],"about_ca_topic_score_codex":0.008107263,"about_ca_topic_score_gemma":0.0086183995,"teacher_disagreement_score":0.008107263,"about_ca_system_score_codex":0.002451572,"about_ca_system_score_gemma":0.0031845898,"threshold_uncertainty_score":0.03318584},"labels":[],"label_agreement":null},{"id":"W2770918708","doi":"10.1061/(asce)ps.1949-1204.0000297","title":"Productivity Analysis of Lateral CIPP Rehabilitation Process Using <i>Simphony</i> Simulation Modeling","year":2017,"lang":"en","type":"article","venue":"Journal of Pipeline Systems Engineering and Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Process (computing); Productivity; Resource (disambiguation); Engineering; Resource allocation; Duration (music); Computer science; Operations research; Systems engineering; Construction engineering; Aeronautics","score_opus":0.021019469487072985,"score_gpt":0.2979930630387638,"score_spread":0.27697359355169077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2770918708","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69742364,0.0002112548,0.2752671,0.00024402952,0.000046008292,0.00015431091,0.000931812,0.0010406679,0.024681231],"genre_scores_gemma":[0.97906554,0.00015403799,0.017948804,0.000011390608,0.000004067043,0.00009886243,0.0002909214,0.000041925392,0.0023844123],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969256,0.000072680974,0.000024910902,0.000051446452,0.00009079206,0.000067594716],"domain_scores_gemma":[0.99927884,0.0003896253,0.00008887853,0.000047206137,0.0001622466,0.000033170487],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064903323,0.0005722326,0.00054652645,0.0010585252,0.0004753581,0.00089270825,0.0007020416,0.00072490727,0.0039459784],"category_scores_gemma":[0.001091202,0.0003334345,0.0010881496,0.0010965598,0.00031184484,0.00066058314,0.00046135645,0.0004144554,0.00035086414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040121442,0.000048896312,0.0024337613,0.000041876396,0.000008805975,0.00004509646,0.000047580324,0.98943746,0.0012859165,0.0012546055,0.00018163373,0.005174246],"study_design_scores_gemma":[0.0000017245029,0.000013260404,0.00024809907,0.0000021266317,0.000002553472,0.000004115877,0.000014578448,0.99896777,0.00050944474,0.00010111721,0.00013239408,0.0000029000046],"about_ca_topic_score_codex":0.028085323,"about_ca_topic_score_gemma":0.010516559,"teacher_disagreement_score":0.028085323,"about_ca_system_score_codex":0.0012120283,"about_ca_system_score_gemma":0.0012465026,"threshold_uncertainty_score":0.05584371},"labels":[],"label_agreement":null},{"id":"W2772066927","doi":"10.29173/mocs158","title":"Design Breakdown in Industrialized Construction: Supporting Lean Manufacturing","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"VINNOVA","keywords":"Standardization; Lean manufacturing; Modular design; Context (archaeology); Manufacturing engineering; Lean construction; Lean project management; Process (computing); Supply chain; Process management; Engineering; Computer science; Business; Construction engineering; Construction industry; Marketing","score_opus":0.024378436996921063,"score_gpt":0.21786821238787568,"score_spread":0.19348977539095463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2772066927","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6834624,0.0005135092,0.2758725,0.002112874,0.00006286281,0.00026686836,0.000057517846,0.0010653276,0.036586173],"genre_scores_gemma":[0.9254696,0.00014838208,0.07098262,0.00013149733,0.000010145616,0.000106532956,0.00007438426,0.00007758632,0.002999256],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9919191,0.003639864,0.0003485478,0.00062400685,0.0025917378,0.0008767757],"domain_scores_gemma":[0.99049765,0.0039189337,0.0017197351,0.0017997455,0.0013934106,0.00067045214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072962204,0.00065250054,0.00043479854,0.0020558909,0.0032085855,0.0065860176,0.0019172681,0.0014199778,0.002284924],"category_scores_gemma":[0.012209293,0.0005919839,0.00037422028,0.0020482526,0.0033840647,0.0034026303,0.0059738536,0.002252038,0.00051616895],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053639454,0.0013316566,0.03582461,0.00060071796,0.000069906055,0.0033814984,0.10860716,0.04054228,0.029544782,0.108752325,0.0058506313,0.66495806],"study_design_scores_gemma":[0.0003107525,0.0023203879,0.04771282,0.0013562534,0.000119439,0.003897342,0.16057178,0.2281173,0.07001256,0.25102207,0.23416445,0.0003947841],"about_ca_topic_score_codex":0.003857188,"about_ca_topic_score_gemma":0.004608824,"teacher_disagreement_score":0.0072962204,"about_ca_system_score_codex":0.005449319,"about_ca_system_score_gemma":0.0070951553,"threshold_uncertainty_score":0.039537787},"labels":[],"label_agreement":null},{"id":"W2781025201","doi":"10.4322/rae.v12n2.e201716","title":"SUPORTES DE SIMULAÇÃO COMO OBJETOS INTERMEDIÁRIOS DE CONCEPÇÃO: EXPERIÊNCIAS NA INDÚSTRIA DE REFINO DE PETRÓLEO","year":2017,"lang":"pt","type":"article","venue":"Revista Ação Ergonômica","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Humanities; Art","score_opus":0.021765040611141522,"score_gpt":0.2859634841043981,"score_spread":0.26419844349325655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2781025201","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95200986,0.00018528091,0.013349645,0.0012882171,0.000022401904,0.00009231788,0.000041629748,0.000115207346,0.032895554],"genre_scores_gemma":[0.9839281,0.00019116298,0.00782187,0.00007280119,0.000004861132,0.000042126383,0.000029174471,0.000041671985,0.007868226],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99701,0.0017169592,0.00007450954,0.0002685813,0.00073228177,0.00019767828],"domain_scores_gemma":[0.99426067,0.003941637,0.00031316557,0.0005506667,0.000549298,0.0003846008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003945761,0.0005723057,0.00032692036,0.00050662167,0.0023119266,0.0040267827,0.0013485805,0.0016322628,0.0068462514],"category_scores_gemma":[0.008886428,0.00041033697,0.00044119614,0.00060435216,0.0044654515,0.0029283648,0.00341298,0.0015031535,0.0007566322],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012827357,0.0020737925,0.045213394,0.001388314,0.00010454314,0.006424598,0.5971273,0.019219225,0.10619525,0.07055262,0.003473078,0.14694516],"study_design_scores_gemma":[0.00022539926,0.004497771,0.044119813,0.0010448266,0.00017680413,0.0032078067,0.5754373,0.046434764,0.07590008,0.049723998,0.19881108,0.0004203846],"about_ca_topic_score_codex":0.007826161,"about_ca_topic_score_gemma":0.011046486,"teacher_disagreement_score":0.007826161,"about_ca_system_score_codex":0.0016779582,"about_ca_system_score_gemma":0.0026786013,"threshold_uncertainty_score":0.022902966},"labels":[],"label_agreement":null},{"id":"W2782111846","doi":"10.52842/conf.ecaade.2017.1.103","title":"Improving Proactive Collaborative Design Through the Integration of BIM and Agent-Based Simulations","year":2017,"lang":"en","type":"article","venue":"eCAADe proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of North Carolina at Charlotte; Politechnika Lódzka; Zayed University; University of Melbourne; Southeast University; Rangsit University; Arab Academy for Science, Technology and Maritime Transport; Istanbul Teknik Üniversitesi; Università di Pisa; Universidade Federal de Santa Catarina; Austrian Institute of Technology; Bilkent Üniversitesi; University of Cyprus; Univerza v Ljubljani; Università di Bologna; Universidade de Lisboa; Hague University of Applied Sciences; National Cheng Kung University; University of British Columbia; Korea Advanced Institute of Science and Technology; Politechnika Bialostocka; Technische Universiteit Eindhoven; University of Crete; Simon Fraser University; National University of Singapore; Orta Doğu Teknik Üniversitesi; KU Leuven; Nottingham Trent University; Aalto-Yliopisto; TU Graz, Internationale Beziehungen und Mobilitätsprogramme; University of Southern California; Yonsei University; Aalborg Universitet; Technische Universiteit Delft; Curtin University of Technology; Trent University; Università degli Studi di Palermo; Tianjin University; Deakin University; Nanjing Institute of Technology; RMIT University; University of Patras; Eidgenössische Technische Hochschule Zürich; University of Technology Sydney; George Mason University; Technische Universität Wien; Sapienza Università di Roma; Universidad de Alicante; Tulane University; České Vysoké Učení Technické v Praze","keywords":"Computer science; Collaborative design; Systems engineering; Process management; Human–computer interaction; Knowledge management; Computer architecture; Software engineering; Engineering; Systems design","score_opus":0.028687033786477422,"score_gpt":0.25455082038131416,"score_spread":0.22586378659483675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782111846","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01251288,0.00025496143,0.9775662,0.00030887543,0.000046888024,0.000103327984,0.000025568104,0.0011190692,0.008062232],"genre_scores_gemma":[0.27462885,0.00044554487,0.72061217,0.000096388,0.00003221965,0.00025617616,0.00019283584,0.00024952064,0.0034863425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9930964,0.0033683933,0.00036976696,0.0006073777,0.002272627,0.00028540668],"domain_scores_gemma":[0.9946688,0.0019438548,0.00032885995,0.002107782,0.0006589432,0.00029186407],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061703604,0.0013894916,0.0011761569,0.0016883196,0.0009803791,0.0048011416,0.0026016976,0.0018364473,0.0041981493],"category_scores_gemma":[0.010338452,0.0011631537,0.0010362511,0.0013162199,0.0016185729,0.0053676143,0.009588151,0.0020513409,0.0013275228],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019022834,0.0007846243,0.002860107,0.00042557268,0.0002564078,0.00029384042,0.0026130334,0.5615188,0.02133616,0.12769426,0.0032035634,0.27882347],"study_design_scores_gemma":[0.00005126452,0.00014674476,0.00071629323,0.00012067383,0.0000838902,0.000112427195,0.00060497044,0.90208155,0.007793905,0.05281931,0.03540391,0.00006499773],"about_ca_topic_score_codex":0.002551388,"about_ca_topic_score_gemma":0.0032467488,"teacher_disagreement_score":0.0061703604,"about_ca_system_score_codex":0.0011969159,"about_ca_system_score_gemma":0.0025680403,"threshold_uncertainty_score":0.03263241},"labels":[],"label_agreement":null},{"id":"W2782433133","doi":"10.1139/cjce-2017-0540","title":"Construction productivity fuzzy knowledge base management system","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Knowledge base; Productivity; Fuzzy logic; Computer science; Fuzzy set; Data mining; Process (computing); Function (biology); Operations research; Industrial engineering; Artificial intelligence; Engineering","score_opus":0.0061411202440411605,"score_gpt":0.1710154705746404,"score_spread":0.16487435033059925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2782433133","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089760065,0.00038883602,0.85229504,0.00067163253,0.00009711778,0.0009489679,0.004590211,0.019250654,0.03199744],"genre_scores_gemma":[0.66208756,0.0005258408,0.31789574,0.00016445907,0.000040866456,0.0007178866,0.005937634,0.00013539442,0.01249463],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99928135,0.00006429278,0.00010166664,0.00016917274,0.00031974007,0.000063812404],"domain_scores_gemma":[0.9980635,0.00057315297,0.00016810538,0.0002355178,0.0008930023,0.000066668974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013990673,0.0005406569,0.00059312925,0.0030663526,0.00094172545,0.0026432953,0.0017579844,0.0009010681,0.0053704944],"category_scores_gemma":[0.0051243925,0.00026500432,0.0006103427,0.0016741977,0.00027821763,0.0020222613,0.0008699052,0.00067629904,0.001975495],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000565146,0.00083726086,0.0094969915,0.0004348499,0.00016905925,0.00062832364,0.00085891975,0.1730446,0.009993725,0.017846735,0.012446725,0.7736777],"study_design_scores_gemma":[0.0000721095,0.00013514614,0.0054493016,0.00013482536,0.00015082235,0.00020770695,0.000256557,0.9447842,0.016075732,0.011671445,0.020984478,0.00007766498],"about_ca_topic_score_codex":0.020940471,"about_ca_topic_score_gemma":0.010136022,"teacher_disagreement_score":0.020940471,"about_ca_system_score_codex":0.0021488224,"about_ca_system_score_gemma":0.0022679672,"threshold_uncertainty_score":0.041637182},"labels":[],"label_agreement":null},{"id":"W278338962","doi":"10.1007/978-3-319-07977-6_21","title":"Software Interoperability for Energy Efficient Building Operations Based on the IFC Data Model Standard","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Computer science; Software engineering; Software; Database; Systems engineering; Programming language; Operating system; Engineering","score_opus":0.03129992098616422,"score_gpt":0.2324877924081429,"score_spread":0.2011878714219787,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W278338962","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035572995,0.004947139,0.80042845,0.003372705,0.0012820428,0.00018490534,0.00097326504,0.0030807126,0.18217346],"genre_scores_gemma":[0.07583914,0.012512983,0.77472115,0.0015671772,0.0008348758,0.00077144604,0.011922807,0.003496203,0.118334234],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.996323,0.00049985485,0.00035897255,0.00030526813,0.0022627832,0.00025010292],"domain_scores_gemma":[0.998437,0.00042263797,0.000055256933,0.0006070927,0.00042692595,0.00005105852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028246173,0.0012276471,0.0010050582,0.003548624,0.0010637287,0.005414134,0.002803392,0.0030098625,0.0068894387],"category_scores_gemma":[0.004067197,0.00085482723,0.0015857272,0.00477437,0.0022859669,0.0074270684,0.0027794933,0.0050911233,0.0040180082],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014439217,0.000040731044,0.00008367181,0.00014077904,0.000015420681,0.00008411144,0.00023834789,0.0050678593,0.0018527722,0.86826557,0.02392817,0.10026802],"study_design_scores_gemma":[0.000010243087,0.00002314737,0.00025823066,0.00047141826,0.000028420396,0.00043035424,0.000118887925,0.028350849,0.0053984514,0.41026255,0.55459553,0.000051937594],"about_ca_topic_score_codex":0.0066990266,"about_ca_topic_score_gemma":0.004753059,"teacher_disagreement_score":0.0068894387,"about_ca_system_score_codex":0.0027275432,"about_ca_system_score_gemma":0.0029409511,"threshold_uncertainty_score":0.023047447},"labels":[],"label_agreement":null},{"id":"W2783414237","doi":"10.5555/3242181.3242381","title":"Criticality visualization using 4D simulation for major capital projects","year":2017,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; Hydro-Québec","funders":"","keywords":"Criticality; Visualization; Critical path method; Computer science; Coding (social sciences); Scheduling (production processes); Float (project management); Failure mode, effects, and criticality analysis; Dimension (graph theory); Graphical user interface; Industrial engineering; Distributed computing; Real-time computing; Operations research; Data mining; Systems engineering; Engineering","score_opus":0.07710769506396908,"score_gpt":0.35177122524420595,"score_spread":0.27466353018023687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783414237","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083159216,0.00022836636,0.8951968,0.00038780243,0.00008040348,0.00026869978,0.001189933,0.0075029633,0.011985865],"genre_scores_gemma":[0.445293,0.0006561108,0.5473677,0.00006573876,0.000023946677,0.00047476206,0.0011398122,0.0009100644,0.0040688505],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995876,0.00015968761,0.000030744668,0.000038356506,0.00014675155,0.000036798167],"domain_scores_gemma":[0.9985864,0.000982314,0.000074853444,0.000092173745,0.0001775029,0.00008671343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087249227,0.0010606347,0.0005073456,0.0019729675,0.00057906366,0.0017549227,0.00075732794,0.0010013507,0.009978072],"category_scores_gemma":[0.002110511,0.0006917149,0.0011061913,0.0011819905,0.0004586514,0.00069157215,0.001579688,0.00075856305,0.00075663725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032264792,0.00021020604,0.0044754427,0.00046112575,0.00006880612,0.00049093465,0.0022350906,0.85861546,0.025702585,0.01535748,0.0045470977,0.08751302],"study_design_scores_gemma":[0.000037990692,0.00004322278,0.000660406,0.000054124655,0.000013661436,0.00008998071,0.00017115723,0.9777745,0.006311631,0.0030400802,0.01175307,0.000050092174],"about_ca_topic_score_codex":0.00718735,"about_ca_topic_score_gemma":0.007732596,"teacher_disagreement_score":0.009978072,"about_ca_system_score_codex":0.0007672913,"about_ca_system_score_gemma":0.0012608176,"threshold_uncertainty_score":0.03338003},"labels":[],"label_agreement":null},{"id":"W2783699638","doi":"10.5555/3242181.3242394","title":"Synthesizing engineering design, material takeoff and simulation-based estimating on a bridge deck reinforcement case","year":2017,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Takeoff; Cost estimate; Bridge (graph theory); Lapping; Computer science; Discrete event simulation; Reinforcement; Benchmark (surveying); Reliability engineering; Operations research; Industrial engineering; Engineering; Simulation; Structural engineering; Automotive engineering; Systems engineering; Aeronautics; Mechanical engineering","score_opus":0.04693528544244396,"score_gpt":0.2720019628086853,"score_spread":0.22506667736624136,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2783699638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6950226,0.00030548457,0.2761536,0.0003042083,0.000028652128,0.0003328344,0.00055314135,0.0003026974,0.026996769],"genre_scores_gemma":[0.9266211,0.0001708838,0.07111155,0.000016884871,0.0000043308355,0.00019252342,0.00026950176,0.00004045633,0.0015727892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99933916,0.00026202205,0.00004143549,0.000070224494,0.00021182494,0.00007524352],"domain_scores_gemma":[0.9973834,0.0018986512,0.00016565109,0.00019977677,0.00030578426,0.00004674516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014631726,0.00060676644,0.00070849154,0.0013590616,0.00042599646,0.0014444964,0.0007855278,0.0013601837,0.0028017156],"category_scores_gemma":[0.004373956,0.0006089877,0.00067867443,0.00095487596,0.00052513694,0.0006735823,0.00059704814,0.00069086795,0.00023925008],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000307006,0.000043456654,0.0013934479,0.000036145495,0.000006429141,0.00008197154,0.000050501207,0.9899226,0.0007117344,0.0027034585,0.000070545786,0.0049490267],"study_design_scores_gemma":[0.0000076194456,0.000029543882,0.0005939692,0.000010684321,0.000008816444,0.000014004499,0.00007500848,0.9973003,0.00081136316,0.00062387635,0.0005174695,0.0000073937367],"about_ca_topic_score_codex":0.025628729,"about_ca_topic_score_gemma":0.024139637,"teacher_disagreement_score":0.025628729,"about_ca_system_score_codex":0.0018851749,"about_ca_system_score_gemma":0.001807529,"threshold_uncertainty_score":0.05095905},"labels":[],"label_agreement":null},{"id":"W2784939162","doi":"","title":"Evaluating Unbonded Concrete Overlay for Usage on Ontario Residential Streets","year":2018,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Overlay; Civil engineering; Engineering; Architectural engineering; Transport engineering; Forensic engineering; Construction engineering; Computer science","score_opus":0.01788732872061647,"score_gpt":0.2340416379077353,"score_spread":0.21615430918711884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2784939162","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99293077,0.00005351664,0.0008545128,0.00001311179,0.0000024614599,0.00006827436,0.00031439023,0.000041446052,0.005721443],"genre_scores_gemma":[0.9889916,0.00015002914,0.004910417,0.000005739484,0.0000010074967,0.00002962507,0.0004931624,0.0000287825,0.0053895568],"study_design_codex":"observational","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989548,0.000046866873,0.000018944203,0.00008527725,0.00077115785,0.00012293388],"domain_scores_gemma":[0.99933463,0.00004074598,0.00005614961,0.000038140333,0.0004662161,0.000064051645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041777056,0.00044926084,0.00028003097,0.00091850414,0.0008054295,0.0009212664,0.00053524354,0.00032596308,0.0018759525],"category_scores_gemma":[0.00097463693,0.00024241305,0.00018699282,0.0010889984,0.00046576062,0.0003343911,0.00049009226,0.0001915162,0.0005052643],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011100888,0.0010639507,0.358187,0.0007318771,0.00009133688,0.0022569615,0.009998533,0.05368199,0.35194045,0.0017735902,0.0041799927,0.21498433],"study_design_scores_gemma":[0.00002460755,0.0009870427,0.8461757,0.00009303547,0.00014348277,0.00037647184,0.009822719,0.048853375,0.07420008,0.00017174293,0.019097934,0.00005389833],"about_ca_topic_score_codex":0.5157999,"about_ca_topic_score_gemma":0.8899037,"teacher_disagreement_score":0.48420012,"about_ca_system_score_codex":0.005801333,"about_ca_system_score_gemma":0.0042548133,"threshold_uncertainty_score":0.97410333},"labels":[],"label_agreement":null},{"id":"W2786387705","doi":"10.1139/cjce-2017-0359","title":"Location-based planning and scheduling of highway construction projects in hilly terrain using GIS","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Terrain; Plan (archaeology); Geographic information system; Transport engineering; Computer science; Scheduling (production processes); Variety (cybernetics); Engineering; Geography; Remote sensing; Cartography; Operations management","score_opus":0.01118526872841732,"score_gpt":0.2001879219254669,"score_spread":0.18900265319704956,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2786387705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29731938,0.00024714565,0.68117625,0.00022844749,0.000025577865,0.0007385967,0.0009182864,0.0017539746,0.017592246],"genre_scores_gemma":[0.7448286,0.00025836215,0.25166896,0.0000098506325,0.0000046951886,0.00024836307,0.0004485899,0.00005577188,0.0024767832],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996557,0.00012720477,0.000024087149,0.000044279474,0.000092758324,0.000055998586],"domain_scores_gemma":[0.9996532,0.00011079448,0.00007005288,0.000036996546,0.0000829147,0.000045963843],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005352206,0.0003342531,0.00032520044,0.0010489827,0.0006316837,0.0007050819,0.00047810606,0.00024093948,0.0019652187],"category_scores_gemma":[0.00079583947,0.00034049168,0.0003493485,0.0011697008,0.00044380932,0.00053461286,0.0006741079,0.00022457392,0.00030138227],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000063573236,0.000051109673,0.0044045704,0.00008136556,0.000020149839,0.00030381724,0.000391881,0.9292754,0.004323424,0.00617219,0.0011342011,0.053778224],"study_design_scores_gemma":[0.000024495706,0.00011044414,0.0056975875,0.000022623584,0.000022821167,0.000088176595,0.0011838174,0.9793819,0.0036886598,0.0041630594,0.0055882125,0.000028107348],"about_ca_topic_score_codex":0.030321376,"about_ca_topic_score_gemma":0.05423283,"teacher_disagreement_score":0.030321376,"about_ca_system_score_codex":0.0011981513,"about_ca_system_score_gemma":0.0032109881,"threshold_uncertainty_score":0.0602898},"labels":[],"label_agreement":null},{"id":"W2789648104","doi":"10.1080/15623599.2017.1411458","title":"A BIM-based automation of design and drafting for manufacturing of wood panels for modular residential buildings","year":2018,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":74,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer Aided Design; Engineering; Automation; Software; Manufacturing engineering; Building information modeling; CAD; Engineering drawing; Construction engineering; Systems engineering; Architectural engineering; Computer science; Mechanical engineering; Operations management; Scheduling (production processes)","score_opus":0.011479142267023464,"score_gpt":0.24176380262227326,"score_spread":0.2302846603552498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2789648104","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017108029,0.000067566194,0.974533,0.000031062533,0.000016118398,0.00012964825,0.00017355886,0.0035667846,0.0043742186],"genre_scores_gemma":[0.11833677,0.000123765,0.8787937,0.000015067528,0.000006006128,0.00011600208,0.00055307045,0.00023487114,0.0018206802],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993741,0.00014391945,0.000027150816,0.00008686488,0.00032078044,0.00004716968],"domain_scores_gemma":[0.99968493,0.000057899924,0.000029296258,0.00013298688,0.00007797627,0.000016931748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006843846,0.0006311962,0.000358189,0.0010246519,0.0004710814,0.0006862813,0.00072991155,0.00041635078,0.0033968238],"category_scores_gemma":[0.0010305214,0.0005115143,0.0005451979,0.0007199198,0.0003202891,0.00060053583,0.00095880136,0.0005175398,0.0014025344],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014470215,0.00020401702,0.0025815107,0.00030707446,0.00003141463,0.00043956615,0.000642861,0.08941495,0.1176907,0.017339926,0.007059585,0.76414376],"study_design_scores_gemma":[0.00007129798,0.00042547876,0.009526134,0.00012567877,0.00006677149,0.0016811441,0.00025954444,0.70613134,0.18072245,0.009118748,0.09176733,0.00010403588],"about_ca_topic_score_codex":0.0011476534,"about_ca_topic_score_gemma":0.0019766968,"teacher_disagreement_score":0.0033968238,"about_ca_system_score_codex":0.00023808001,"about_ca_system_score_gemma":0.0011701483,"threshold_uncertainty_score":0.011363447},"labels":[],"label_agreement":null},{"id":"W2790301752","doi":"10.1061/9780784414866.ch05","title":"Formalizing a Construction Planning Framework to Facilitate Construction-Centric BIM Education and Practical Application","year":2018,"lang":"en","type":"book-chapter","venue":"American Society of Civil Engineers eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Computer science; Construction engineering; Process management; Engineering management; Systems engineering; Knowledge management; Engineering; Operations management","score_opus":0.01621837524170043,"score_gpt":0.24156205605327888,"score_spread":0.22534368081157846,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2790301752","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00096362387,0.0004259112,0.957056,0.0005590771,0.00010144778,0.0001852361,0.00008532419,0.00075415906,0.039869267],"genre_scores_gemma":[0.020586679,0.00079219526,0.96376485,0.00015128059,0.00004452097,0.00037098935,0.00034595927,0.00023628984,0.013707306],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988864,0.00033809355,0.00009100064,0.00015507774,0.0004358329,0.00009365072],"domain_scores_gemma":[0.99939895,0.0002179289,0.000046515423,0.00010577541,0.00017279462,0.00005815914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002388585,0.0012628867,0.00051562313,0.0017680117,0.0017909799,0.0041320506,0.00283316,0.0015791196,0.013673341],"category_scores_gemma":[0.002058012,0.0010582902,0.0011361467,0.001915074,0.0024870383,0.005616592,0.003531967,0.0034285937,0.004471499],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005533665,0.00005391518,0.0001244153,0.000174173,0.000004160872,0.00014074551,0.0008399311,0.012104048,0.0010686426,0.91833436,0.006938111,0.060211986],"study_design_scores_gemma":[0.000015289637,0.000042566993,0.00026956637,0.00064985146,0.000015973816,0.0006906772,0.00064406596,0.078910016,0.0027521031,0.29994735,0.6160127,0.00004981595],"about_ca_topic_score_codex":0.006741601,"about_ca_topic_score_gemma":0.011760901,"teacher_disagreement_score":0.013673341,"about_ca_system_score_codex":0.0025751267,"about_ca_system_score_gemma":0.0046228296,"threshold_uncertainty_score":0.045741856},"labels":[],"label_agreement":null},{"id":"W2791664214","doi":"10.14428/rcompro.vi3.513","title":"La communication organisationnelle et numérique : formation en mutation, profession en construction","year":2016,"lang":"fr","type":"article","venue":"Revue Communication & professionnalisation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Musée de la Civilisation","funders":"","keywords":"Philosophy; Sociology; Political science","score_opus":0.014896528911770516,"score_gpt":0.26908908853448343,"score_spread":0.2541925596227129,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2791664214","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58464336,0.007737853,0.04949579,0.02962268,0.00071702147,0.00025536484,0.00021009815,0.00027616817,0.32704166],"genre_scores_gemma":[0.96530735,0.0018247373,0.008699658,0.00091214856,0.00014554021,0.00020233908,0.00006441085,0.00007014933,0.022773506],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9895767,0.005164133,0.00042109957,0.0010762772,0.0028928216,0.00086891395],"domain_scores_gemma":[0.9755372,0.012579392,0.0038704542,0.0015341849,0.0037692063,0.0027095652],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006487012,0.0004492782,0.00047534474,0.002859631,0.0046881773,0.010406974,0.001078323,0.0019232706,0.011460794],"category_scores_gemma":[0.025457846,0.00039412954,0.0005022608,0.0025121574,0.0138094565,0.008208606,0.00697793,0.0024797926,0.0017548609],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013990274,0.00016348777,0.062907256,0.00071367715,0.00006416824,0.00068155624,0.2350126,0.0011461242,0.0023961603,0.46953443,0.00647802,0.22076264],"study_design_scores_gemma":[0.000043996675,0.00040223522,0.25089574,0.001860307,0.00007117222,0.0019529589,0.21799643,0.0028958453,0.002311912,0.15813382,0.36319026,0.00024537125],"about_ca_topic_score_codex":0.012018402,"about_ca_topic_score_gemma":0.008284081,"teacher_disagreement_score":0.012018402,"about_ca_system_score_codex":0.006683436,"about_ca_system_score_gemma":0.008999124,"threshold_uncertainty_score":0.048491955},"labels":[],"label_agreement":null},{"id":"W2792045066","doi":"10.1680/jmaen.2017.25","title":"Briefing: Design and construction of Canary Wharf temporary floating road, London, UK","year":2017,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Maritime Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Wharf; Modular design; Constructability; Engineering; Deck; Civil engineering; Truck; Transport engineering; Marine engineering; Structural engineering; Computer science","score_opus":0.008119535470759632,"score_gpt":0.1807588723347878,"score_spread":0.17263933686402816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792045066","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.093275815,0.0018951485,0.100185886,0.0011199305,0.0012441056,0.0016847282,0.0031315046,0.0024373615,0.79502547],"genre_scores_gemma":[0.20091633,0.0012361115,0.060306437,0.00012209945,0.00005495707,0.0004337583,0.0021096612,0.00098439,0.7338363],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99873894,0.00010201693,0.00007883717,0.00012103136,0.0008010597,0.00015820052],"domain_scores_gemma":[0.99942505,0.000034213987,0.000028994193,0.00008563596,0.0003153234,0.000110841465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005151692,0.0009290888,0.00028210695,0.0015279017,0.001725966,0.0025086305,0.0011823812,0.0012100177,0.058311723],"category_scores_gemma":[0.0010702703,0.000674302,0.0004299851,0.0008176106,0.00081027957,0.0010897705,0.0015842936,0.0005933749,0.02084199],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048330886,0.00016743343,0.0073437057,0.0020742586,0.000050123846,0.007093311,0.005539977,0.045568395,0.06653003,0.03076645,0.19115299,0.64322996],"study_design_scores_gemma":[0.00003094527,0.00033449387,0.0071614007,0.00016332374,0.00004547598,0.0019149628,0.002639626,0.0047367495,0.01028811,0.000950264,0.9716618,0.000072756324],"about_ca_topic_score_codex":0.058989946,"about_ca_topic_score_gemma":0.18328363,"teacher_disagreement_score":0.058989946,"about_ca_system_score_codex":0.0027619242,"about_ca_system_score_gemma":0.0029975036,"threshold_uncertainty_score":0.19507217},"labels":[],"label_agreement":null},{"id":"W2792975990","doi":"","title":"Building information modelling demystified: Does it make business sense to adopt BIM","year":2008,"lang":"en","type":"article","venue":"RMIT Research Repository (RMIT University Library)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Documentation; Engineering; Process (computing); Architecture; Construction industry; Engineering management; Process management; Knowledge management; Construction engineering; Computer science; Operations management","score_opus":0.02306894783828476,"score_gpt":0.21157856944156037,"score_spread":0.1885096216032756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2792975990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42743546,0.007770556,0.06618926,0.16297106,0.00061853975,0.00038408808,0.00033979822,0.00056300615,0.33372825],"genre_scores_gemma":[0.9657372,0.002551465,0.024074866,0.002640692,0.00007876465,0.00007548394,0.00021265078,0.00015036964,0.004478471],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9794652,0.010721018,0.00094521104,0.00120212,0.0059890226,0.0016774458],"domain_scores_gemma":[0.96713525,0.014810933,0.0030993023,0.008351226,0.004861067,0.0017423097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02557624,0.00047449663,0.00055613654,0.004415493,0.00305055,0.024469977,0.0027776172,0.0033072443,0.003615369],"category_scores_gemma":[0.036108032,0.0006837757,0.00088725996,0.006940114,0.015180257,0.03565254,0.010310368,0.005159398,0.0011049823],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011816429,0.0002179444,0.028853398,0.00081871444,0.000083133884,0.0007172706,0.09672051,0.0023638653,0.0022626868,0.5723717,0.009629064,0.28584358],"study_design_scores_gemma":[0.000038203514,0.00018531033,0.02548391,0.0032595997,0.00012253219,0.0011499604,0.19356059,0.010790502,0.0027399594,0.35956556,0.40295315,0.00015078725],"about_ca_topic_score_codex":0.01073957,"about_ca_topic_score_gemma":0.010347261,"teacher_disagreement_score":0.02557624,"about_ca_system_score_codex":0.009465091,"about_ca_system_score_gemma":0.01179067,"threshold_uncertainty_score":0.13526165},"labels":[],"label_agreement":null},{"id":"W2794251541","doi":"10.6028/nist.bss.180","title":"Database-assisted design for wind :","year":2006,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Standards and Technology; Università degli Studi di Perugia; Concordia University; Florida Institute of Technology; Johns Hopkins University","keywords":"Database; Computer science; Environmental science","score_opus":0.058262075025438294,"score_gpt":0.2650594403282623,"score_spread":0.206797365302824,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2794251541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020149972,0.00023435926,0.97517145,0.00009546841,0.00009333091,0.0001928261,0.0013346826,0.014135089,0.006727761],"genre_scores_gemma":[0.09625366,0.0007604523,0.8740813,0.00023227348,0.00006390257,0.0012446305,0.008874908,0.0032424,0.015246442],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983411,0.00035531007,0.00015395274,0.00017814433,0.00085573073,0.00011577346],"domain_scores_gemma":[0.99843293,0.00031316944,0.00009059952,0.00043962308,0.00064952904,0.0000741876],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026471133,0.0009595055,0.00074565795,0.0008276035,0.0004013616,0.00221286,0.0028481146,0.0007600714,0.037698388],"category_scores_gemma":[0.0043153334,0.0005793361,0.000783073,0.0010326761,0.0003798005,0.0013558419,0.001558711,0.00090508815,0.011305111],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008131533,0.0002678221,0.0021662384,0.00092848897,0.00018366742,0.0002985087,0.00035184575,0.115083456,0.022170823,0.052609555,0.12980141,0.67532504],"study_design_scores_gemma":[0.00031409872,0.0002870224,0.0010104529,0.00012604916,0.00009564818,0.00049557333,0.00013235588,0.5332547,0.024005665,0.02461699,0.4155924,0.000068964124],"about_ca_topic_score_codex":0.0016820033,"about_ca_topic_score_gemma":0.0020623116,"teacher_disagreement_score":0.037698388,"about_ca_system_score_codex":0.00035912995,"about_ca_system_score_gemma":0.0011125061,"threshold_uncertainty_score":0.12611365},"labels":[],"label_agreement":null},{"id":"W2797021855","doi":"10.29173/mocs51","title":"Prefabrication in the Australian context","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Context (archaeology); Architectural engineering; Engineering; Settlement (finance); Interpretation (philosophy); Product (mathematics); Civil engineering; Construction engineering; Computer science; History; Archaeology; World Wide Web","score_opus":0.013321409691143605,"score_gpt":0.21645898710042966,"score_spread":0.20313757740928606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2797021855","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44460806,0.018181732,0.016943177,0.029867483,0.00077012496,0.00015498362,0.00015028664,0.00015964796,0.48916453],"genre_scores_gemma":[0.849797,0.016373305,0.010412669,0.0033656417,0.00014648584,0.000060989827,0.00010769508,0.000087329325,0.11964889],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984352,0.00033970154,0.00007538135,0.00018160454,0.0007022687,0.00026585124],"domain_scores_gemma":[0.9991861,0.00014611836,0.00009348872,0.00009529408,0.00029716405,0.00018181602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001872733,0.00028537997,0.000223059,0.0010347161,0.0043353946,0.0035678009,0.0009057347,0.0015631886,0.009035014],"category_scores_gemma":[0.0017051186,0.0003138605,0.00021866447,0.0021170336,0.003865366,0.0024339443,0.0053525595,0.0021897044,0.0006074431],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007423004,0.0002898974,0.009708895,0.00107439,0.000015131141,0.004953614,0.126855,0.0018272297,0.012842724,0.44546214,0.0260032,0.3708935],"study_design_scores_gemma":[0.0000035230169,0.00017708745,0.03773167,0.00064974814,0.00001367461,0.0027221213,0.028306868,0.0013101263,0.001844824,0.0215213,0.90566903,0.000050026993],"about_ca_topic_score_codex":0.061209485,"about_ca_topic_score_gemma":0.10096301,"teacher_disagreement_score":0.061209485,"about_ca_system_score_codex":0.0059053167,"about_ca_system_score_gemma":0.006379583,"threshold_uncertainty_score":0.121706426},"labels":[],"label_agreement":null},{"id":"W2800225083","doi":"10.7939/r3154dt9g","title":"Developing and Optimizing Context-Specific and Universal Construction Labour Productivity Models","year":2015,"lang":"en","type":"article","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Context (archaeology); Computer science; Economics; Risk analysis (engineering); Labour economics; Business; Economic growth; Geology","score_opus":0.01542777285286997,"score_gpt":0.15909950938828876,"score_spread":0.1436717365354188,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800225083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14276183,0.00076070795,0.837299,0.00063462864,0.000075537966,0.000293464,0.0014634287,0.0006576507,0.016053766],"genre_scores_gemma":[0.8605811,0.0006770007,0.13305627,0.00008404316,0.00002721333,0.000529933,0.0010409908,0.000080869155,0.0039226473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906844,0.00025363124,0.00006188276,0.00024045615,0.00019990084,0.0001756829],"domain_scores_gemma":[0.99866796,0.0007165733,0.0001830602,0.000065021,0.0003007223,0.00006661481],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017646024,0.0010905302,0.0008278524,0.0014746084,0.0005062109,0.0020028614,0.0019170656,0.001193027,0.0025652046],"category_scores_gemma":[0.0046864576,0.00078582915,0.0014756247,0.0013568572,0.0006726412,0.0013528642,0.0018986586,0.0011902455,0.00035947195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001178579,0.000018169883,0.0016422678,0.000038451526,0.000019882482,0.000039981314,0.000076560464,0.98606074,0.00020928323,0.004270194,0.00021180352,0.007400884],"study_design_scores_gemma":[0.0000024577885,0.000008242778,0.00039395748,0.000014818658,0.0000091416205,0.000007956729,0.00005490279,0.99612397,0.000101122394,0.0028583962,0.00041982593,0.0000051851125],"about_ca_topic_score_codex":0.04502275,"about_ca_topic_score_gemma":0.037222467,"teacher_disagreement_score":0.04502275,"about_ca_system_score_codex":0.00276441,"about_ca_system_score_gemma":0.003006156,"threshold_uncertainty_score":0.08952141},"labels":[],"label_agreement":null},{"id":"W2800605709","doi":"10.1155/2018/5802918","title":"Context Adaptation of Fuzzy Inference System-Based Construction Labor Productivity Models","year":2018,"lang":"en","type":"article","venue":"Advances in Fuzzy Systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Context (archaeology); Computer science; Fuzzy logic; Adaptation (eye); Inference; Machine learning; Artificial intelligence; Industrial engineering; Data mining; Engineering","score_opus":0.014444037182669164,"score_gpt":0.23507153452697405,"score_spread":0.22062749734430487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2800605709","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47352913,0.0003806468,0.5175156,0.00021791634,0.00006307621,0.00019399227,0.00030618955,0.00047769654,0.007315727],"genre_scores_gemma":[0.9810563,0.00008319709,0.01797571,0.000017442768,0.000006373156,0.00009421785,0.00008944108,0.00000786309,0.0006695222],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995746,0.00013721347,0.000027321685,0.00011828687,0.00007764415,0.00006487022],"domain_scores_gemma":[0.9994141,0.0003172543,0.000072681105,0.000032758566,0.00014198305,0.000021257069],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00097884,0.0007478348,0.00052177155,0.00079723535,0.0003914627,0.0009789482,0.001236392,0.0008282627,0.0012340953],"category_scores_gemma":[0.0026346594,0.00034669606,0.00091849634,0.00056313566,0.00035413526,0.00073041563,0.0007042506,0.00081062206,0.0001288956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028321787,0.000027522425,0.0015827946,0.000015843583,0.00002097205,0.00005060232,0.00006223723,0.98957753,0.0003934921,0.0010988758,0.000074494186,0.0070673055],"study_design_scores_gemma":[0.0000019659074,0.000008299986,0.00041521984,0.000002756776,0.0000048835836,0.0000030197848,0.000012024464,0.9989937,0.0001131751,0.00038329422,0.0000585364,0.0000031367927],"about_ca_topic_score_codex":0.027434785,"about_ca_topic_score_gemma":0.01636577,"teacher_disagreement_score":0.027434785,"about_ca_system_score_codex":0.0013501587,"about_ca_system_score_gemma":0.0008625465,"threshold_uncertainty_score":0.05455023},"labels":[],"label_agreement":null},{"id":"W2801128291","doi":"10.1016/j.buildenv.2018.04.019","title":"Life cycle sustainability performance assessment framework for residential modular buildings: Aggregated sustainability indices","year":2018,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":148,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Multiple-criteria decision analysis; Process (computing); Life-cycle assessment; ELECTRE; Engineering; Computer science; Operations research; Economics","score_opus":0.005157188246402178,"score_gpt":0.2363628578111186,"score_spread":0.23120566956471642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801128291","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18822253,0.00050674815,0.7676364,0.0003089317,0.00004033075,0.00031066922,0.0024933435,0.00094775565,0.039533302],"genre_scores_gemma":[0.84412825,0.00029671684,0.14935333,0.00004993701,0.000027394268,0.0002763364,0.0020111061,0.00010376013,0.0037531957],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988226,0.00029326297,0.00006640824,0.00011083816,0.00057560706,0.00013122451],"domain_scores_gemma":[0.999181,0.0000951748,0.00013675807,0.000110642795,0.00042548994,0.000050948252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021031457,0.00095653767,0.0006056738,0.0037927255,0.00038465182,0.0020463043,0.0010676084,0.0005202221,0.0020113545],"category_scores_gemma":[0.0019245755,0.00025897176,0.00083576655,0.0025118014,0.00042633098,0.0015068938,0.0016126259,0.0005532008,0.00044851736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007983725,0.00046271013,0.024902618,0.00024200272,0.00030366692,0.00011153207,0.00032604535,0.70677686,0.008025528,0.07671276,0.0049787224,0.17707768],"study_design_scores_gemma":[0.000010992823,0.000247607,0.020313837,0.00011806142,0.00014200267,0.0001317417,0.00048868806,0.9228879,0.0043900195,0.03741639,0.013792536,0.000060299764],"about_ca_topic_score_codex":0.0057387077,"about_ca_topic_score_gemma":0.010866884,"teacher_disagreement_score":0.0057387077,"about_ca_system_score_codex":0.0015557314,"about_ca_system_score_gemma":0.0012185503,"threshold_uncertainty_score":0.011410594},"labels":[],"label_agreement":null},{"id":"W2801749318","doi":"10.7939/r3wd3q64h","title":"A Conceptual Cost Comparison Study between Alberta and Overseas Module Assembly Strategies for Industrial Construction Projects","year":2016,"lang":"en","type":"article","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construction engineering; Computer science; Engineering; Operations management; Engineering management; Engineering drawing; Business","score_opus":0.029883102563609033,"score_gpt":0.2113735887995482,"score_spread":0.18149048623593916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801749318","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96722925,0.0002208621,0.0099575855,0.0001181466,0.00001002065,0.00042372762,0.000110069,0.000024667454,0.021905623],"genre_scores_gemma":[0.9847503,0.00021560384,0.013091859,0.00001479754,0.000001723558,0.00014019579,0.00013384121,0.000007717264,0.0016438983],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99696857,0.0013226524,0.00010428289,0.00015372378,0.0011003293,0.00035060738],"domain_scores_gemma":[0.9964965,0.0017059395,0.0003677823,0.00013880337,0.0010866157,0.00020441823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035749532,0.0007146209,0.00038342882,0.0035181572,0.0012112977,0.0024947678,0.0012715983,0.0005796349,0.00420419],"category_scores_gemma":[0.007258268,0.0002703907,0.00056685304,0.0045125317,0.0007683647,0.0017272178,0.0011225626,0.00047591943,0.00016530753],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0024024623,0.0032467921,0.17712401,0.0010685239,0.0002677689,0.0015365995,0.013387826,0.2624692,0.011673696,0.11901998,0.0029977828,0.40480536],"study_design_scores_gemma":[0.00034245962,0.0076388735,0.4049781,0.00051590556,0.0005311782,0.0005153174,0.0923826,0.4415985,0.011793502,0.013433293,0.025980141,0.00029010916],"about_ca_topic_score_codex":0.13819976,"about_ca_topic_score_gemma":0.22573952,"teacher_disagreement_score":0.86180025,"about_ca_system_score_codex":0.018492788,"about_ca_system_score_gemma":0.010690332,"threshold_uncertainty_score":0.27479064},"labels":[],"label_agreement":null},{"id":"W2801904618","doi":"10.1080/15623599.2018.1462446","title":"Framework for target cost modelling in construction projects","year":2018,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Activity-based costing; Computer science; Compatibility (geochemistry); Target costing; Cost estimate; Project management; Intuition; Construction management; Earned value management; Simulated annealing; Process (computing); Project planning; Systems engineering; Operations research; Risk analysis (engineering); Engineering","score_opus":0.0204039321566213,"score_gpt":0.26796112155436264,"score_spread":0.24755718939774135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2801904618","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010498783,0.00010899437,0.9923768,0.00014363964,0.000014675967,0.000056874353,0.0000919462,0.00010084081,0.00605634],"genre_scores_gemma":[0.13732232,0.00088125234,0.85330397,0.000078485675,0.000060245507,0.0010759021,0.00041198413,0.00020445247,0.006661314],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99814963,0.0008874428,0.00012417597,0.00018352772,0.00053387694,0.00012129251],"domain_scores_gemma":[0.99885523,0.000627449,0.00012393652,0.0001305592,0.00021671406,0.000046080313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029414236,0.0012721355,0.00074689504,0.0026395419,0.0007738021,0.0030899283,0.0032183619,0.0015985004,0.005412786],"category_scores_gemma":[0.0048100883,0.00075070484,0.0019206747,0.002905975,0.0012549064,0.0024963845,0.0017565021,0.001694926,0.0012521298],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000006810614,0.000024429786,0.00025327667,0.000051660674,0.000015726764,0.00006588554,0.000081607766,0.37643275,0.00024223347,0.6093819,0.0009891456,0.0124546625],"study_design_scores_gemma":[0.000009293947,0.000017247969,0.00011569666,0.000043451673,0.000012352951,0.000060663424,0.000043548956,0.80297965,0.00021847093,0.18205148,0.0144329015,0.0000153275],"about_ca_topic_score_codex":0.007933823,"about_ca_topic_score_gemma":0.0069574835,"teacher_disagreement_score":0.007933823,"about_ca_system_score_codex":0.002466062,"about_ca_system_score_gemma":0.0025046386,"threshold_uncertainty_score":0.018107593},"labels":[],"label_agreement":null},{"id":"W2802224221","doi":"10.7939/r39h5q","title":"New Quantitative Methods for Planning Earthwork Operations","year":2014,"lang":"en","type":"article","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earthworks; Computer science; Geography; Cartography","score_opus":0.013698036902936434,"score_gpt":0.23706472570702877,"score_spread":0.22336668880409233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2802224221","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00059587957,0.000090051064,0.99765426,0.00004097114,0.000013960827,0.000028012193,0.00008449782,0.000087212415,0.0014052195],"genre_scores_gemma":[0.081360705,0.0007518172,0.914317,0.00005489478,0.000055474207,0.00045589928,0.0004553692,0.00015922278,0.002389613],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979091,0.0008168611,0.000118592805,0.000212734,0.000873807,0.00006887309],"domain_scores_gemma":[0.995805,0.0027192018,0.00038532843,0.00037661183,0.00064554805,0.00006828992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037707589,0.0014804708,0.00077279075,0.0031446815,0.00060578814,0.0026976846,0.0017980789,0.00071264565,0.0043891077],"category_scores_gemma":[0.00950348,0.0008835281,0.0011272008,0.0030448602,0.0014942532,0.0024023855,0.0015805998,0.0018679642,0.000696161],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013096624,0.000026617594,0.00058688247,0.00014406005,0.000032668995,0.000026597576,0.00010517348,0.80178374,0.00065812835,0.122597806,0.0013557845,0.0726694],"study_design_scores_gemma":[0.0000072954435,0.000017321796,0.00024385251,0.000042285672,0.0000103715665,0.000022625753,0.000057586654,0.9352384,0.00043101632,0.056877166,0.0070323884,0.000019725256],"about_ca_topic_score_codex":0.012289002,"about_ca_topic_score_gemma":0.013235022,"teacher_disagreement_score":0.012289002,"about_ca_system_score_codex":0.0025537931,"about_ca_system_score_gemma":0.0025558078,"threshold_uncertainty_score":0.024434924},"labels":[],"label_agreement":null},{"id":"W2803759846","doi":"","title":"Experience In Geotechnical Design Of Overseas Port Facilities","year":2000,"lang":"en","type":"article","venue":"ISRM International Symposium","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Port (circuit theory); Civil engineering; Engineering; Geotechnical engineering","score_opus":0.014523629252375289,"score_gpt":0.23321004721342137,"score_spread":0.21868641796104607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2803759846","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8687346,0.00061131176,0.03743483,0.0006673608,0.0000619215,0.00009718162,0.00013140425,0.00023651659,0.092024945],"genre_scores_gemma":[0.9413931,0.0008112842,0.024529394,0.000100607955,0.000020219155,0.000025581354,0.00013983225,0.00011666653,0.03286331],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99775594,0.0012609224,0.000097161734,0.0001372782,0.0005273655,0.00022125794],"domain_scores_gemma":[0.99778664,0.0008290049,0.00010084289,0.00035346474,0.0005023474,0.0004276683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003340377,0.0008096849,0.00034834797,0.0007063631,0.0019801192,0.0022971467,0.0010600146,0.0011570603,0.009264756],"category_scores_gemma":[0.0034224049,0.00035641433,0.00039833668,0.0014391649,0.0011125024,0.0013448187,0.0014956169,0.0009207275,0.0011909832],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011735942,0.0035206918,0.04271524,0.00064748636,0.00007172911,0.004351778,0.115876116,0.058259636,0.03483559,0.025244866,0.010255095,0.7030481],"study_design_scores_gemma":[0.00019672795,0.0076453527,0.052968435,0.00046732315,0.00016491108,0.007098635,0.14232579,0.054024376,0.040646553,0.010578085,0.68365914,0.00022479576],"about_ca_topic_score_codex":0.007149095,"about_ca_topic_score_gemma":0.021395294,"teacher_disagreement_score":0.009264756,"about_ca_system_score_codex":0.0015593315,"about_ca_system_score_gemma":0.0018571607,"threshold_uncertainty_score":0.03099376},"labels":[],"label_agreement":null},{"id":"W2804574988","doi":"10.1080/24751448.2017.1354625","title":"Disrupting the Status Quo with Early-Stage BIM-Based Energy Modeling","year":2017,"lang":"en","type":"article","venue":"Technology|Architecture + Design","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Schematic; Building information modeling; Status quo; Process (computing); Computer science; Systems engineering; Software; Fidelity; Conceptual design; Engineering design process; Energy (signal processing); Engineering; Software engineering; Human–computer interaction; Operations management; Mechanical engineering","score_opus":0.01409326529873526,"score_gpt":0.21438712174826352,"score_spread":0.20029385644952827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804574988","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06922864,0.0005552488,0.8924164,0.007555976,0.00036979097,0.00014275193,0.0003562168,0.0025029746,0.026872033],"genre_scores_gemma":[0.68092155,0.00061849575,0.31011766,0.00060201896,0.00010693554,0.00022953315,0.00037596826,0.00095091364,0.006076933],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9871372,0.0064112623,0.00060266047,0.0007998415,0.0045335824,0.0005154496],"domain_scores_gemma":[0.9567335,0.016884634,0.0020606215,0.016391391,0.0073802876,0.0005496552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021290785,0.0011246883,0.00097576965,0.0012868446,0.0012608021,0.0061447397,0.0038639582,0.0019847495,0.0049311696],"category_scores_gemma":[0.052207258,0.0012247156,0.0010786051,0.0011022615,0.0031744733,0.012717468,0.0052662524,0.0040341406,0.0028087518],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050156406,0.0005867699,0.014130984,0.00058450515,0.00014801258,0.00023140245,0.0030251935,0.3251115,0.0072827754,0.3940107,0.008907675,0.24547899],"study_design_scores_gemma":[0.00008916606,0.00040462363,0.0038797944,0.0006699615,0.000062329265,0.00022252975,0.0013936658,0.7103301,0.012985964,0.20607045,0.06370859,0.00018282884],"about_ca_topic_score_codex":0.0052569457,"about_ca_topic_score_gemma":0.0050397613,"teacher_disagreement_score":0.021290785,"about_ca_system_score_codex":0.002443638,"about_ca_system_score_gemma":0.0033941793,"threshold_uncertainty_score":0.11259776},"labels":[],"label_agreement":null},{"id":"W2804760574","doi":"10.29173/mocs2","title":"A comparison between Volumetric Timber Manufacturing Strategies in the UK and mainland Europe","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Strathclyde","keywords":"Context (archaeology); Variety (cybernetics); Flexibility (engineering); Productivity; Prefabrication; Mainland; Production (economics); Quality (philosophy); Factory (object-oriented programming); Greenhouse gas; Legislation; Engineering; Business; Architectural engineering; Environmental economics; Operations management; Civil engineering; Computer science; Economics","score_opus":0.011403069545361544,"score_gpt":0.21569144283581632,"score_spread":0.20428837329045477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2804760574","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98098904,0.0010418463,0.0010339064,0.00007825907,0.00001004338,0.00005241559,0.00013952878,0.000015873282,0.016639158],"genre_scores_gemma":[0.9906669,0.0010862949,0.0020010099,0.000071877526,0.0000034801765,0.00003211057,0.0003267759,0.000020975363,0.005790592],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9978041,0.00040504974,0.00021305593,0.00029181677,0.0008376338,0.0004483496],"domain_scores_gemma":[0.9982326,0.00048811437,0.0004128398,0.00016139096,0.0005501395,0.00015493014],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018366091,0.00030397272,0.00021447343,0.0021620586,0.00081089715,0.0022157317,0.00048475416,0.00047878534,0.0026881502],"category_scores_gemma":[0.0026771482,0.00026199193,0.00046539912,0.002747579,0.0008078903,0.00085372996,0.001475695,0.00019386847,0.0005049437],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021309592,0.00045369417,0.4116709,0.0011699218,0.00021598359,0.0033464702,0.029500993,0.0060445843,0.033414435,0.011804546,0.0034318792,0.49681565],"study_design_scores_gemma":[0.000034381108,0.0012465,0.92383903,0.00035208874,0.00010408914,0.0013993528,0.02715568,0.0010115424,0.006611427,0.0003700144,0.037816882,0.00005906307],"about_ca_topic_score_codex":0.022033956,"about_ca_topic_score_gemma":0.08282086,"teacher_disagreement_score":0.022033956,"about_ca_system_score_codex":0.0032619177,"about_ca_system_score_gemma":0.0010481452,"threshold_uncertainty_score":0.04381144},"labels":[],"label_agreement":null},{"id":"W2805325611","doi":"10.1061/(asce)la.1943-4170.0000267","title":"Visualization of Delay Claim Analysis Using 4D Simulation","year":2018,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Critical path method; Context (archaeology); Computer science; Visualization; Schedule; Path (computing); Operations research; Data mining; Systems engineering; Engineering","score_opus":0.006555455917501233,"score_gpt":0.23057001709491212,"score_spread":0.2240145611774109,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2805325611","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16629097,0.0005246092,0.7841896,0.0011857932,0.00029629,0.00033127572,0.0029693963,0.0071456134,0.037066463],"genre_scores_gemma":[0.7595933,0.0006767366,0.22989035,0.00014527435,0.000044438748,0.00034479972,0.0015221057,0.0005835136,0.0071994006],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996489,0.00008900562,0.000026923044,0.00003634741,0.00016261221,0.00003612979],"domain_scores_gemma":[0.9988881,0.0006606812,0.000076144664,0.00010036796,0.00022256373,0.000052206102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00065658335,0.00077865156,0.00043346433,0.0022288128,0.00043192008,0.0015754348,0.00062175863,0.0010346683,0.01171101],"category_scores_gemma":[0.0020055445,0.00029679234,0.00071631663,0.0010537389,0.00044674784,0.0007610132,0.0012002342,0.0006315991,0.00077643874],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004495726,0.0001883939,0.0061833514,0.00070634746,0.00008251587,0.0009435402,0.0029545068,0.80323476,0.029744174,0.04752796,0.008881086,0.099103704],"study_design_scores_gemma":[0.000045557197,0.00006762667,0.001681455,0.00011442728,0.000029837276,0.00016553508,0.0004954411,0.95193994,0.009964691,0.009886768,0.02554061,0.00006814498],"about_ca_topic_score_codex":0.0042777434,"about_ca_topic_score_gemma":0.0026874433,"teacher_disagreement_score":0.01171101,"about_ca_system_score_codex":0.0007135801,"about_ca_system_score_gemma":0.0011589145,"threshold_uncertainty_score":0.03917718},"labels":[],"label_agreement":null},{"id":"W2805339209","doi":"10.11159/iccste18.137","title":"Design Optimization of Building Structures Using a Metamodeling Method","year":2018,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Metamodeling; Computer science; Software engineering","score_opus":0.027119365001486415,"score_gpt":0.25375788998607973,"score_spread":0.2266385249845933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2805339209","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041735475,0.00006482724,0.9937662,0.000031283744,0.0000087998,0.00002731103,0.000021686963,0.00014042428,0.0017659059],"genre_scores_gemma":[0.25066727,0.00032611523,0.7446839,0.00007822609,0.00002078585,0.00046741325,0.0001573556,0.00017611684,0.0034227434],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996973,0.00011397405,0.000013128539,0.000047609425,0.00010350453,0.000024393743],"domain_scores_gemma":[0.9998129,0.00009295739,0.000019537381,0.000025759773,0.000041244595,0.000007665358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075573684,0.00073421345,0.0008801675,0.00058493833,0.00031465056,0.0005490075,0.00068201165,0.0009916291,0.0016949204],"category_scores_gemma":[0.0007165898,0.00048295234,0.001118599,0.0004237405,0.00045414641,0.00046244462,0.00062949274,0.0007482026,0.00043778785],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012458539,0.00001897068,0.00013312319,0.000043751086,0.000014369068,0.000024005027,0.000027008167,0.96954376,0.0070775175,0.0066979486,0.00017059011,0.01623649],"study_design_scores_gemma":[0.000004676967,0.00001830424,0.00005103462,0.000007494299,0.0000050125545,0.000012042316,0.0000050669178,0.9960594,0.0011650756,0.0012566159,0.0014109971,0.0000042144657],"about_ca_topic_score_codex":0.0020556932,"about_ca_topic_score_gemma":0.002113167,"teacher_disagreement_score":0.0020556932,"about_ca_system_score_codex":0.00049733033,"about_ca_system_score_gemma":0.0009032531,"threshold_uncertainty_score":0.0056700706},"labels":[],"label_agreement":null},{"id":"W2807801518","doi":"10.14288/1.0365783","title":"Quality control and quality assurance in hybrid mass timber high-rise construction : a case study of the Brock Commons","year":2018,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Quality (philosophy); Quality assurance; Control (management); Business; Operations management; Engineering; Environmental science; Economics; Service (business); Marketing; Management","score_opus":0.008679589358911855,"score_gpt":0.1925286385221926,"score_spread":0.18384904916328074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2807801518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97829354,0.00035116318,0.004670071,0.0020260648,0.000016328979,0.00022574306,0.000023258297,0.000022919865,0.014370968],"genre_scores_gemma":[0.99057454,0.0003153014,0.003699103,0.00021461883,0.000008569563,0.00004308774,0.000016557697,0.000017906414,0.0051102852],"study_design_codex":"qualitative","study_design_gemma":"case_report","domain_scores_codex":[0.99343044,0.003962183,0.0001619328,0.00033563157,0.0013386736,0.00077116385],"domain_scores_gemma":[0.99227214,0.0046887277,0.00078682124,0.00032731344,0.0009979485,0.0009270101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064281938,0.00029615412,0.00026257258,0.0008455761,0.009651789,0.0028411394,0.0017318124,0.0021478299,0.00215861],"category_scores_gemma":[0.008777964,0.00039385483,0.0002948503,0.0011998306,0.005708527,0.0013281154,0.0021444897,0.0019905865,0.00018200581],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002843579,0.0025216583,0.058546204,0.0008709121,0.000048678205,0.060723674,0.7185678,0.0076847067,0.009179707,0.0313553,0.008457015,0.10176005],"study_design_scores_gemma":[0.000040288523,0.0011543791,0.054359853,0.00049091014,0.000037926875,0.0066963816,0.8574452,0.0063464283,0.004451004,0.0022221277,0.06667596,0.00007955082],"about_ca_topic_score_codex":0.0808885,"about_ca_topic_score_gemma":0.19982472,"teacher_disagreement_score":0.9191115,"about_ca_system_score_codex":0.009472595,"about_ca_system_score_gemma":0.007233517,"threshold_uncertainty_score":0.16083539},"labels":[],"label_agreement":null},{"id":"W2808239110","doi":"10.1061/(asce)co.1943-7862.0001534","title":"Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains","year":2018,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Rework; Computer science; Quality (philosophy); Reliability engineering; Markov chain; Cost estimate; Control (management); Decision support system; Systems engineering; Industrial engineering; Engineering; Data mining","score_opus":0.04038355625375099,"score_gpt":0.2943404203671337,"score_spread":0.2539568641133827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808239110","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031866007,0.00008145145,0.962948,0.00023039767,0.000029036924,0.00010172075,0.00037086234,0.00039154378,0.0039809337],"genre_scores_gemma":[0.9249833,0.0002769148,0.06850735,0.00007404941,0.000026426707,0.0006177729,0.00067660114,0.00007745354,0.0047601005],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990212,0.00030468375,0.00006341461,0.00021032011,0.00025542564,0.00014496369],"domain_scores_gemma":[0.99751794,0.0015170159,0.0003144997,0.00013929087,0.00041212467,0.00009914233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018537854,0.00093829446,0.0011214761,0.00094960333,0.0005862883,0.001799591,0.0022773305,0.0015100216,0.003121452],"category_scores_gemma":[0.0041534835,0.00079405174,0.0011838812,0.0009464019,0.0009872952,0.001360873,0.0012568353,0.001607831,0.00039391304],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010794724,0.0000072481957,0.00017872646,0.0000054218085,0.000004156525,0.0000127195,0.000009675341,0.9953141,0.00013751899,0.003664413,0.000042990137,0.00061222137],"study_design_scores_gemma":[0.0000028641105,0.0000030442682,0.000027767073,0.0000012654397,0.0000019036378,0.0000017907067,0.00000178531,0.9989378,0.00008577227,0.00085732236,0.000076729004,0.0000019166534],"about_ca_topic_score_codex":0.025392195,"about_ca_topic_score_gemma":0.012918082,"teacher_disagreement_score":0.025392195,"about_ca_system_score_codex":0.002191566,"about_ca_system_score_gemma":0.0025495673,"threshold_uncertainty_score":0.05048883},"labels":[],"label_agreement":null},{"id":"W2808806300","doi":"10.1016/j.jobe.2018.06.010","title":"Energy-based target cost modelling for construction projects","year":2018,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Energy consumption; Activity-based costing; Energy accounting; Process (computing); Reliability engineering; Computer science; Energy (signal processing); Set (abstract data type); Capital cost; Cost estimate; Risk analysis (engineering); Industrial engineering; Efficient energy use; Systems engineering; Operations research; Engineering","score_opus":0.013445565789680267,"score_gpt":0.21118844441778348,"score_spread":0.19774287862810322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2808806300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35958537,0.0006753649,0.59464586,0.00032226817,0.00006300328,0.00007735048,0.0011109905,0.00035187253,0.043167826],"genre_scores_gemma":[0.9819441,0.00022241595,0.013121966,0.000011376965,0.000005311199,0.00005216109,0.0002869755,0.000086463246,0.0042691403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967,0.00010790242,0.000019253222,0.000038744056,0.00011049687,0.000053556254],"domain_scores_gemma":[0.9995577,0.00025174493,0.000029931838,0.00003683688,0.00010522601,0.00001861817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059827376,0.00059512875,0.00070430763,0.00090577785,0.00034028108,0.0013773266,0.001169361,0.0011960013,0.0037901592],"category_scores_gemma":[0.0019443247,0.0005443697,0.0007111351,0.0017852451,0.00031703542,0.0012886475,0.0005583011,0.00054186385,0.0004986171],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000094791485,0.000008603102,0.00023146394,0.000009547264,0.0000041505596,0.000011551949,0.000008003556,0.99437755,0.00010055443,0.002506679,0.00008545672,0.0026470858],"study_design_scores_gemma":[0.0000014663384,0.0000036922077,0.00017469822,0.0000030743759,0.0000027777003,0.0000055460287,0.000008039006,0.9980326,0.00010517565,0.0014075581,0.00025291322,0.000002506389],"about_ca_topic_score_codex":0.020715106,"about_ca_topic_score_gemma":0.015899653,"teacher_disagreement_score":0.020715106,"about_ca_system_score_codex":0.0013329827,"about_ca_system_score_gemma":0.0009159851,"threshold_uncertainty_score":0.041189075},"labels":[],"label_agreement":null},{"id":"W2809473643","doi":"10.1139/cjce-2017-0327","title":"Optimizing planning of build–operate–transfer projects to maximize investor profit","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Profit (economics); Operations research; Schedule; Critical path method; Computer science; Scheduling (production processes); Project management; Operations management; Engineering; Systems engineering; Economics","score_opus":0.013749784649060157,"score_gpt":0.19492939485394714,"score_spread":0.181179610204887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2809473643","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2462568,0.00039230796,0.72644746,0.0005525542,0.000037013637,0.00039989906,0.00035308237,0.0004011582,0.02515966],"genre_scores_gemma":[0.8931767,0.00035460797,0.10140528,0.000033970642,0.0000075868743,0.00025417068,0.0001796872,0.00006563035,0.004522459],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995827,0.00015933391,0.0000118330545,0.000057207184,0.00008968783,0.00009918206],"domain_scores_gemma":[0.9995634,0.0002373787,0.00007023087,0.00001660902,0.000066544,0.000045896377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00090058864,0.00080660684,0.0006748427,0.0005712607,0.00046935753,0.0012225272,0.0006777153,0.0008447161,0.002566968],"category_scores_gemma":[0.0013358638,0.00063296495,0.000609824,0.00073423487,0.0004880469,0.00081312715,0.0005458229,0.00084564823,0.00023161308],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017974424,0.000015682266,0.0002543145,0.000020424468,0.0000047708218,0.000027150978,0.000015122694,0.9939243,0.00039710524,0.0012824688,0.00013241362,0.0039083576],"study_design_scores_gemma":[0.0000056992867,0.000033537737,0.0001918496,0.00000429729,0.0000045006063,0.000006123767,0.00003478136,0.99784803,0.00038556848,0.001176138,0.0003057173,0.000003816989],"about_ca_topic_score_codex":0.03425664,"about_ca_topic_score_gemma":0.03540096,"teacher_disagreement_score":0.03425664,"about_ca_system_score_codex":0.0022578677,"about_ca_system_score_gemma":0.0046915426,"threshold_uncertainty_score":0.06811446},"labels":[],"label_agreement":null},{"id":"W2810316557","doi":"10.1177/875697280003100406","title":"Resource Optimization in a Design Office Using Simulation","year":2000,"lang":"en","type":"article","venue":"Project Management Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada); University of Waterloo","funders":"","keywords":"Teamwork; Productivity; Computer science; Work (physics); Industrial engineering; Simulation modeling; Resource (disambiguation); Engineering management; Manufacturing engineering; Operations research; Systems engineering; Engineering","score_opus":0.027662595099991225,"score_gpt":0.2522000646184353,"score_spread":0.22453746951844408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2810316557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65678525,0.00042983913,0.32357687,0.00029668756,0.00004268703,0.00020039977,0.00026231885,0.0005944357,0.017811516],"genre_scores_gemma":[0.95020366,0.00025800476,0.047130596,0.000033342334,0.000007035819,0.00020760608,0.00016271087,0.000056147666,0.0019408539],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993799,0.00030632303,0.000029579609,0.00006689468,0.000110943474,0.000106447755],"domain_scores_gemma":[0.9986106,0.0010323033,0.00008575725,0.00009663673,0.00011169261,0.000063024345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009054668,0.00066388963,0.0010102151,0.0005537273,0.0005583304,0.0010743574,0.00082835776,0.0010310202,0.0022843068],"category_scores_gemma":[0.0017462807,0.0005238671,0.00064751273,0.00075111666,0.0007121548,0.0009017762,0.00068931945,0.00060081977,0.00021291291],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056322024,0.00003269557,0.0005791726,0.000014583368,0.0000070070864,0.000017373777,0.000027824792,0.99578506,0.00050807477,0.0009801227,0.000053617223,0.0019381933],"study_design_scores_gemma":[0.000022697204,0.000032527565,0.0001798814,0.000005311311,0.0000054516586,0.0000057313737,0.000029540495,0.998066,0.00046410033,0.000723252,0.0004593761,0.0000062416893],"about_ca_topic_score_codex":0.015373338,"about_ca_topic_score_gemma":0.0071310843,"teacher_disagreement_score":0.015373338,"about_ca_system_score_codex":0.0011094825,"about_ca_system_score_gemma":0.0016413719,"threshold_uncertainty_score":0.030567706},"labels":[],"label_agreement":null},{"id":"W2822730844","doi":"","title":"Microsoft Project 2013 et exploitation agile","year":2015,"lang":"fr","type":"book","venue":"Loze-Dion éditeur eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Library science; Art; Computer science","score_opus":0.029919820297010617,"score_gpt":0.2543026875978066,"score_spread":0.22438286730079599,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2822730844","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012227502,0.0024066702,0.7788215,0.0036018759,0.0009136206,0.0010112539,0.0018793186,0.015893875,0.18324429],"genre_scores_gemma":[0.06293768,0.0027879993,0.7741601,0.0008469977,0.00017888729,0.0024769893,0.003967999,0.009076051,0.14356735],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9893378,0.004148508,0.0007796793,0.0014340612,0.0036086694,0.000691294],"domain_scores_gemma":[0.992968,0.00223417,0.0005739406,0.0016548138,0.0018479021,0.000721091],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010028448,0.0016045612,0.0005571608,0.0021510546,0.0016361877,0.007460364,0.001726949,0.0020787953,0.026033843],"category_scores_gemma":[0.018767642,0.001382997,0.0012560819,0.002361791,0.0017369424,0.0048582056,0.0067745526,0.00362918,0.010874021],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035210646,0.00015688819,0.0018645144,0.0009513894,0.000076290395,0.0005911132,0.007393487,0.004729494,0.0057760677,0.37926516,0.08069602,0.5181475],"study_design_scores_gemma":[0.00010052587,0.00010653289,0.0008685261,0.0007892288,0.00003230402,0.00071508717,0.0012453253,0.007115783,0.005330324,0.06383716,0.91977,0.00008920498],"about_ca_topic_score_codex":0.00586399,"about_ca_topic_score_gemma":0.0060667386,"teacher_disagreement_score":0.026033843,"about_ca_system_score_codex":0.0017755073,"about_ca_system_score_gemma":0.006188413,"threshold_uncertainty_score":0.08709192},"labels":[],"label_agreement":null},{"id":"W2847174986","doi":"10.1139/cjce-2018-0047","title":"A framework for building information modeling implementation in engineering education","year":2018,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Computer science; Engineering management; Engineering education; Subject (documents); Management science; Engineering; Operations management","score_opus":0.0073114268020109535,"score_gpt":0.2306581101728075,"score_spread":0.22334668337079655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2847174986","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014006266,0.00037624995,0.9634477,0.004183892,0.0000910149,0.0006117991,0.00012161256,0.00081404886,0.028953023],"genre_scores_gemma":[0.032751884,0.00041033627,0.9617548,0.00030598504,0.000027288823,0.0008890074,0.00026931794,0.00009148238,0.003499857],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9872929,0.007836166,0.0011889776,0.0008672658,0.002045796,0.00076902896],"domain_scores_gemma":[0.99257153,0.0038518575,0.00046781436,0.0008721764,0.001459064,0.00077754946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019446366,0.0016488691,0.000959537,0.006277239,0.0033982254,0.011125969,0.006545947,0.006345124,0.008332941],"category_scores_gemma":[0.012218625,0.0012860096,0.002725571,0.0048455824,0.008415703,0.010581251,0.007829623,0.005139377,0.002375668],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000010175861,0.000098095625,0.0003673538,0.00016366766,0.000018069175,0.00023283929,0.0022416527,0.010835242,0.0003003155,0.95848763,0.002359951,0.024885017],"study_design_scores_gemma":[0.00005276573,0.000101880054,0.0003779164,0.0013011291,0.000050856463,0.00042974175,0.0037154765,0.075951874,0.0010367295,0.6920188,0.22486575,0.00009701495],"about_ca_topic_score_codex":0.023886312,"about_ca_topic_score_gemma":0.022022428,"teacher_disagreement_score":0.023886312,"about_ca_system_score_codex":0.0075776577,"about_ca_system_score_gemma":0.01599925,"threshold_uncertainty_score":0.102843404},"labels":[],"label_agreement":null},{"id":"W2886644990","doi":"10.1061/9780784481271.062","title":"Chaos and Complexity in Modeling and Detection of Spatial Temporal Clashes in Construction Processes","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Chaotic; Crew; Sensitivity (control systems); Variable (mathematics); Stochastic process; Scheduling (production processes); Stochastic modelling; Mathematical optimization; Simulation; Industrial engineering; Operations research; Artificial intelligence; Mathematics; Engineering","score_opus":0.07628720370253153,"score_gpt":0.31401790003296814,"score_spread":0.2377306963304366,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886644990","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.531224,0.00069379376,0.45965078,0.0009816183,0.000043264296,0.00011488112,0.00022499314,0.00013914969,0.0069275643],"genre_scores_gemma":[0.98807526,0.00020173634,0.010729326,0.000018225193,0.000015831938,0.00005373582,0.000045017714,0.0000136462,0.0008470892],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991804,0.00036370015,0.000053048454,0.00014172692,0.00014843226,0.000112722686],"domain_scores_gemma":[0.99532807,0.0033852088,0.00074852695,0.00018190713,0.0002009684,0.00015527368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016800265,0.0005773489,0.0007304066,0.001599947,0.0006568149,0.0019445033,0.0007325598,0.0009919108,0.00073307916],"category_scores_gemma":[0.006839378,0.00047310782,0.0012914219,0.0008936372,0.0018515086,0.0016205367,0.0016725194,0.0009067048,0.0000647452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020194706,0.000013760447,0.003848677,0.000017963239,0.000027166345,0.00006736238,0.00016792152,0.9752313,0.0003273947,0.018436885,0.00006868705,0.0017726562],"study_design_scores_gemma":[0.0000018674449,0.000008652255,0.0007743169,0.0000047952703,0.000005511138,0.000012399682,0.000029958755,0.9910279,0.00006298406,0.007961772,0.00010281321,0.000007027227],"about_ca_topic_score_codex":0.018894875,"about_ca_topic_score_gemma":0.0071346713,"teacher_disagreement_score":0.018894875,"about_ca_system_score_codex":0.002176108,"about_ca_system_score_gemma":0.001111673,"threshold_uncertainty_score":0.03756982},"labels":[],"label_agreement":null},{"id":"W2886659502","doi":"10.1155/2018/4896748","title":"Simulation and Optimization for Railway Operations Management","year":2018,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Transport engineering; Engineering; Operations research","score_opus":0.007504623912327204,"score_gpt":0.24323847854805133,"score_spread":0.23573385463572413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2886659502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009690292,0.004011358,0.95286435,0.0019303157,0.000440846,0.00014360649,0.00051084126,0.0007562055,0.029652158],"genre_scores_gemma":[0.49579674,0.008912148,0.46671364,0.00061672943,0.0006631763,0.001283108,0.0013946389,0.0006320229,0.023987798],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999275,0.00037358355,0.000049140992,0.00008360711,0.00016602098,0.00005248136],"domain_scores_gemma":[0.99878746,0.000825727,0.00012123825,0.000076313285,0.00014625394,0.000043083342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011774314,0.0011546918,0.001311606,0.0006933708,0.0005355835,0.0015778427,0.0008587881,0.0015730971,0.006364644],"category_scores_gemma":[0.0029378652,0.00051801134,0.0012548604,0.0011028312,0.00093592564,0.00091135065,0.001380619,0.0016302909,0.0010329275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012558917,0.000016773487,0.00021317006,0.000056050274,0.000023319817,0.000015320164,0.000017357374,0.95813084,0.00021907706,0.030935297,0.0011905005,0.009169734],"study_design_scores_gemma":[0.0000053281474,0.0000049179985,0.00004295124,0.000012590701,0.0000031355141,0.0000030026563,0.0000051791817,0.9838495,0.00007284844,0.012866481,0.0031303142,0.0000037586],"about_ca_topic_score_codex":0.010453192,"about_ca_topic_score_gemma":0.005992991,"teacher_disagreement_score":0.010453192,"about_ca_system_score_codex":0.0013040358,"about_ca_system_score_gemma":0.0016961875,"threshold_uncertainty_score":0.021291852},"labels":[],"label_agreement":null},{"id":"W2887697636","doi":"10.1061/9780784481264.003","title":"Recommender System for Improving BIM Efficiency: An Interior Finishing Case Study","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Recommender system; Computer science; World Wide Web","score_opus":0.06519546889621741,"score_gpt":0.3512973582163273,"score_spread":0.2861018893201099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887697636","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.548412,0.0007768683,0.43487647,0.0006681904,0.000051663377,0.00045062008,0.00022865734,0.0017548586,0.012780622],"genre_scores_gemma":[0.6833721,0.00047791252,0.30720657,0.00007437781,0.000019167566,0.00013179213,0.00027842447,0.000095391035,0.008344343],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983851,0.0006640407,0.00010334284,0.00021415317,0.0005403282,0.00009304462],"domain_scores_gemma":[0.9976579,0.0011267755,0.000105969135,0.0004095865,0.0006172446,0.000082461265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002494329,0.00063007465,0.0009934836,0.0008742918,0.00083046115,0.0010484583,0.0013915793,0.0014937373,0.0033441957],"category_scores_gemma":[0.0038650853,0.0003703854,0.00076702813,0.0011821334,0.000435627,0.0013651015,0.0008800677,0.00063184835,0.0008038542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011451404,0.0026814875,0.022492107,0.0010815297,0.00032061784,0.0031824945,0.0029979136,0.20762846,0.04995655,0.015014041,0.0082665365,0.6852331],"study_design_scores_gemma":[0.00015066881,0.00096461707,0.010043827,0.00006121015,0.00019153192,0.0013238149,0.0011450584,0.9263311,0.035453442,0.0022391763,0.02197761,0.00011794358],"about_ca_topic_score_codex":0.008594241,"about_ca_topic_score_gemma":0.012570333,"teacher_disagreement_score":0.008594241,"about_ca_system_score_codex":0.0006582873,"about_ca_system_score_gemma":0.000531835,"threshold_uncertainty_score":0.017088413},"labels":[],"label_agreement":null},{"id":"W2887795122","doi":"10.1155/2018/7259659","title":"Practices and Processes in BIM Projects: An Exploratory Case Study","year":2018,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":52,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Exploratory research; Building information modeling; Process management; Knowledge management; Business; Perception; Project management; Engineering management; Computer science; Engineering; Systems engineering; Operations management; Sociology; Psychology","score_opus":0.018728696894623555,"score_gpt":0.2787540057842128,"score_spread":0.26002530888958925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2887795122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9824839,0.00020954416,0.009252768,0.00041774556,0.000009830222,0.0003455603,0.000053891246,0.000021458342,0.007205235],"genre_scores_gemma":[0.98494613,0.0004653911,0.011384199,0.000104611834,0.000011687484,0.00033328155,0.00005111899,0.000019151092,0.002684307],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.980981,0.014174327,0.0005149338,0.0008645636,0.0022819487,0.0011831471],"domain_scores_gemma":[0.986743,0.00961227,0.0011086647,0.00088255614,0.0007565861,0.0008969379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01154855,0.0005975306,0.000491987,0.0024648963,0.007758098,0.0039193984,0.0019078765,0.003335827,0.0018972687],"category_scores_gemma":[0.014876837,0.0007125815,0.0004301446,0.0032552409,0.0052098944,0.0037501422,0.004532115,0.0018818239,0.00051072484],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029859744,0.0029154792,0.031420913,0.00059262995,0.000032868385,0.017411679,0.8774925,0.002464404,0.0048353504,0.015295234,0.0010923657,0.046148032],"study_design_scores_gemma":[0.000056132438,0.0013614385,0.023256218,0.00049185246,0.000045695793,0.011070329,0.89895505,0.004585879,0.006484109,0.0052463138,0.04834092,0.000106079664],"about_ca_topic_score_codex":0.002111152,"about_ca_topic_score_gemma":0.003920013,"teacher_disagreement_score":0.01154855,"about_ca_system_score_codex":0.002688319,"about_ca_system_score_gemma":0.0023379447,"threshold_uncertainty_score":0.06107527},"labels":[],"label_agreement":null},{"id":"W2888490855","doi":"10.1080/10298436.2018.1511785","title":"Risk analysis in paving operations using discrete event simulation: a case study of Taiwan permeable asphalt concrete pavement pilot road project","year":2018,"lang":"en","type":"article","venue":"International Journal of Pavement Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Excavator; Truck; Engineering; Discrete event simulation; Software; Sensitivity (control systems); Total cost; Cost analysis; Simulation software; Data collection; Transport engineering; Event (particle physics); Civil engineering; Operations research; Computer science; Simulation; Statistics; Mathematics","score_opus":0.02283878285775297,"score_gpt":0.30289023650639746,"score_spread":0.2800514536486445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888490855","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9868601,0.000069443406,0.011128369,0.000092332884,0.000006876615,0.000073526564,0.0001644816,0.000045353423,0.0015594888],"genre_scores_gemma":[0.99608105,0.000058010355,0.0033921408,0.0000051832726,0.0000020136647,0.000039530172,0.00008182886,0.000004361611,0.0003358807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894255,0.0005898751,0.000051855095,0.00009919174,0.00015863437,0.00015799618],"domain_scores_gemma":[0.99655104,0.0025269138,0.00030942404,0.0001605664,0.00031058292,0.00014143056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018624646,0.0010288248,0.0007803474,0.0011928498,0.00058399356,0.0010650757,0.0011383757,0.0013763476,0.0010497401],"category_scores_gemma":[0.0027942888,0.00049915235,0.0011616272,0.00096650334,0.0005514743,0.0008811085,0.0006307509,0.00082305743,0.000078448065],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009825043,0.00014776463,0.004757254,0.00002781525,0.00003663582,0.00035934523,0.000053438675,0.9917424,0.0005824733,0.0006461888,0.0000746454,0.0014738451],"study_design_scores_gemma":[0.00002699652,0.00013729655,0.0016945627,0.000005483954,0.000027328895,0.000040275863,0.00016333922,0.99661595,0.0008057566,0.00035846583,0.00010899869,0.000015581889],"about_ca_topic_score_codex":0.022304777,"about_ca_topic_score_gemma":0.011200865,"teacher_disagreement_score":0.022304777,"about_ca_system_score_codex":0.0017216589,"about_ca_system_score_gemma":0.0012977349,"threshold_uncertainty_score":0.04434991},"labels":[],"label_agreement":null},{"id":"W2888947374","doi":"10.1016/j.autcon.2018.07.009","title":"Automated Crane Planning and Optimization for modular construction","year":2018,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":82,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Modular design; Lift (data mining); Engineering; Plan (archaeology); Modular construction; Lifting equipment; Computer science; Operating system; Mechanical engineering","score_opus":0.008868786673722838,"score_gpt":0.23415949695181468,"score_spread":0.22529071027809183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2888947374","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0626241,0.00023947355,0.92909396,0.000094446405,0.000022409275,0.000072013485,0.00016934317,0.0009868194,0.0066974163],"genre_scores_gemma":[0.7790719,0.0001593919,0.21659362,0.000022213411,0.000012251476,0.000094338735,0.00025544682,0.00016142911,0.0036293538],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996631,0.00008213151,0.000009987142,0.00006501631,0.00012371957,0.000056092267],"domain_scores_gemma":[0.9996669,0.0001783032,0.000027540429,0.000051417224,0.00005832461,0.00001753074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036358627,0.0006469955,0.0010445969,0.000637525,0.0005443072,0.00074934255,0.00088316156,0.00061378855,0.0041746013],"category_scores_gemma":[0.0012721888,0.00069276517,0.0006628901,0.0007897644,0.00067552185,0.0007035271,0.001020545,0.00078065717,0.0004014332],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004385724,0.000025246873,0.00025442132,0.000028448938,0.00001108558,0.000018821596,0.000027714834,0.9597967,0.0011160554,0.0036997613,0.00051461614,0.034463286],"study_design_scores_gemma":[0.0000037420173,0.000008684733,0.00009643144,0.0000016624574,0.000002315846,0.000003980166,0.0000055487326,0.99779105,0.00035302434,0.0014353157,0.00029601654,0.0000022279323],"about_ca_topic_score_codex":0.030714504,"about_ca_topic_score_gemma":0.039862696,"teacher_disagreement_score":0.030714504,"about_ca_system_score_codex":0.0008513896,"about_ca_system_score_gemma":0.0021451183,"threshold_uncertainty_score":0.061071455},"labels":[],"label_agreement":null},{"id":"W2889342920","doi":"10.11159/ijci.2018.004","title":"Structural Design Developed in a BIM Environment: Benefits and Limitations","year":2018,"lang":"en","type":"article","venue":"International Journal of Civil Infrastructure","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Systems engineering; Construction engineering; Engineering","score_opus":0.02065791858393398,"score_gpt":0.22162707401152593,"score_spread":0.20096915542759194,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2889342920","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1695366,0.0060114404,0.63007927,0.0075734346,0.000301706,0.0006846006,0.0009786487,0.0012447243,0.18358964],"genre_scores_gemma":[0.56094307,0.0038168826,0.42480093,0.00044669735,0.00009011395,0.0005148199,0.00064332946,0.00028343598,0.00846067],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9766143,0.014314546,0.000770324,0.0005715896,0.0074063432,0.00032278203],"domain_scores_gemma":[0.9771763,0.013145907,0.0006818049,0.0045346003,0.0042550657,0.00020626537],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015630195,0.0007826952,0.00055653055,0.0024922926,0.0008835484,0.003762984,0.0024739278,0.0016168068,0.00444499],"category_scores_gemma":[0.026457105,0.0005820531,0.00066923373,0.0041741948,0.0016027237,0.0048718494,0.0022086273,0.0009258938,0.0017081529],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031805175,0.0004370656,0.014202061,0.003184067,0.00013217377,0.00046649127,0.0072170356,0.055283822,0.0077643297,0.18008764,0.0062559666,0.72465134],"study_design_scores_gemma":[0.00012552408,0.0011538407,0.026903927,0.0035427485,0.00025243606,0.0036603613,0.026567718,0.24869458,0.021505829,0.18370463,0.4836599,0.00022851341],"about_ca_topic_score_codex":0.002190241,"about_ca_topic_score_gemma":0.0025272414,"teacher_disagreement_score":0.015630195,"about_ca_system_score_codex":0.0012672481,"about_ca_system_score_gemma":0.0027512398,"threshold_uncertainty_score":0.08266139},"labels":[],"label_agreement":null},{"id":"W2890974131","doi":"10.1007/978-3-030-00560-3_12","title":"Integrating Construction Specifications and Building Information Modeling","year":2018,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Software engineering","score_opus":0.01618171138215881,"score_gpt":0.21077274715354305,"score_spread":0.19459103577138423,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2890974131","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024413879,0.0019104666,0.9267124,0.0006427872,0.0001203393,0.000040211857,0.00039101433,0.0010688163,0.066672616],"genre_scores_gemma":[0.1258804,0.010143744,0.790062,0.0004005156,0.0001274545,0.00019441868,0.0061342386,0.0015741554,0.06548313],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99872154,0.0002664621,0.00011018462,0.00009696996,0.0007454338,0.000059419854],"domain_scores_gemma":[0.99907494,0.0003946051,0.000041850762,0.00025499667,0.00021140168,0.00002226632],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013220974,0.0011285864,0.00063315255,0.0021943904,0.00056098844,0.004310282,0.0023182298,0.0012274687,0.0079541765],"category_scores_gemma":[0.0027567872,0.0011602787,0.001367301,0.0038781217,0.0011484666,0.005364723,0.0021831205,0.0020607726,0.0037178686],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000113909155,0.000029572342,0.00021795141,0.00035818675,0.00002608267,0.00013399954,0.00051667704,0.037149705,0.0014406746,0.7653005,0.009207699,0.18560757],"study_design_scores_gemma":[0.000005937256,0.000020772566,0.0002060713,0.00043438227,0.000045855042,0.00029798705,0.00029726553,0.14429884,0.005068312,0.46070406,0.3885821,0.00003841038],"about_ca_topic_score_codex":0.006008617,"about_ca_topic_score_gemma":0.0071772286,"teacher_disagreement_score":0.0079541765,"about_ca_system_score_codex":0.0013984005,"about_ca_system_score_gemma":0.0013985843,"threshold_uncertainty_score":0.026609361},"labels":[],"label_agreement":null},{"id":"W2891549375","doi":"10.1155/2018/8370931","title":"A Framework for Visualizing Heterogeneous Construction Data Using Semantic Web Standards","year":2018,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Computer science; Process (computing); Scope (computer science); Ontology; Data visualization; Web application; Semantic Web; Reusability; Data science; Data mining; Information retrieval; World Wide Web","score_opus":0.02114504344089685,"score_gpt":0.3116526671792647,"score_spread":0.29050762373836786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2891549375","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007025571,0.00020748861,0.9908784,0.00041393514,0.00006375889,0.00030852592,0.00039792855,0.0033687127,0.003658707],"genre_scores_gemma":[0.012566498,0.00067739043,0.98138386,0.00013020875,0.000047579146,0.0007214113,0.0018229198,0.0005422696,0.0021078526],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99089265,0.002601468,0.0018174178,0.0007864711,0.0034471839,0.00045473655],"domain_scores_gemma":[0.99492764,0.0013358744,0.00043443547,0.0016125789,0.0012729899,0.00041652465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0135151455,0.0020866443,0.0017178728,0.009657593,0.0031153623,0.012654138,0.0050678155,0.004276052,0.0039625354],"category_scores_gemma":[0.009660685,0.0022568742,0.0049435766,0.0076413597,0.003925379,0.012867459,0.00712333,0.0055210586,0.0025242115],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008057876,0.00019809832,0.0007298943,0.0005685436,0.00016027047,0.0010265212,0.0022187675,0.023374356,0.006030249,0.8577623,0.013266719,0.094583735],"study_design_scores_gemma":[0.000073652605,0.000090474154,0.0006980987,0.0009773017,0.00011898457,0.0010018096,0.0011314033,0.14405032,0.0083978465,0.4668742,0.37635452,0.00023144313],"about_ca_topic_score_codex":0.018861314,"about_ca_topic_score_gemma":0.018850967,"teacher_disagreement_score":0.018861314,"about_ca_system_score_codex":0.002996814,"about_ca_system_score_gemma":0.006957428,"threshold_uncertainty_score":0.071475744},"labels":[],"label_agreement":null},{"id":"W2894668980","doi":"10.1108/978-1-78743-868-220181004","title":"Fuzzy Simulation Techniques in Construction Engineering and Management","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Computer science; Systems engineering; Process (computing); Discrete event simulation; Simulation modeling; Industrial engineering; Engineering; Control engineering; Simulation; Artificial intelligence; Mathematics","score_opus":0.007184235666520729,"score_gpt":0.19461971802902697,"score_spread":0.18743548236250623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2894668980","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006168234,0.04416133,0.58749086,0.0036701702,0.0010248957,0.00013502954,0.00018504517,0.00063303276,0.3565314],"genre_scores_gemma":[0.23907171,0.092059284,0.41976908,0.0009602219,0.0007175541,0.00039342314,0.00054293586,0.0002821252,0.24620366],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957436,0.0001216546,0.000023579187,0.000044986584,0.00021467938,0.000020723246],"domain_scores_gemma":[0.99973565,0.00015109626,0.000012913494,0.000029497218,0.00005965584,0.000011181219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073602085,0.0007237583,0.0004190477,0.0011090655,0.0007120028,0.0017010926,0.0008205938,0.0009224069,0.008823969],"category_scores_gemma":[0.00095249113,0.00031669918,0.00063788117,0.0014040674,0.0011141198,0.0016975008,0.0008525537,0.0012894229,0.0018319993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012151544,0.000030148994,0.00015501968,0.00028775833,0.000022681494,0.00009050992,0.00047698015,0.048147134,0.000990352,0.7863498,0.019858032,0.14357938],"study_design_scores_gemma":[0.000009911912,0.00003349733,0.00027177398,0.00040202838,0.000016714017,0.00023280158,0.00023685837,0.07689906,0.0013495552,0.4248466,0.4956732,0.000028006787],"about_ca_topic_score_codex":0.0033531555,"about_ca_topic_score_gemma":0.0035295796,"teacher_disagreement_score":0.008823969,"about_ca_system_score_codex":0.0018274366,"about_ca_system_score_gemma":0.0013201853,"threshold_uncertainty_score":0.029519081},"labels":[],"label_agreement":null},{"id":"W2895430233","doi":"10.1061/9780784481301.057","title":"Improved Target-Value Design Approach through the Integration of Environmental Performance and Reliability Theory","year":2018,"lang":"en","type":"article","venue":"Construction Research Congress 2018","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Military College Saint-Jean; University of Alberta","funders":"","keywords":"Interdependence; Computer science; Stakeholder; Process management; Building information modeling; Value engineering; Activity-based costing; Systems engineering; Risk analysis (engineering); Engineering; Business; Operations management; Scheduling (production processes)","score_opus":0.028512684103118083,"score_gpt":0.2715133520780976,"score_spread":0.24300066797497955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895430233","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047261715,0.000280389,0.9567154,0.0008463995,0.00006918473,0.00012594892,0.000026980348,0.0000835964,0.037125908],"genre_scores_gemma":[0.31621563,0.000944505,0.67400354,0.0002828172,0.00009247727,0.00055203034,0.00009040364,0.00017621719,0.0076424065],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99249274,0.0031733345,0.00031692078,0.0005174821,0.003198391,0.00030115168],"domain_scores_gemma":[0.9942433,0.0028548203,0.00042723367,0.0005668331,0.0017325882,0.00017512693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0082059475,0.0014836362,0.0009123399,0.003657427,0.0013110171,0.005807604,0.0025865508,0.0016574498,0.0038668038],"category_scores_gemma":[0.009710246,0.0008010135,0.0012770565,0.0018839757,0.004421828,0.0057321866,0.0037092983,0.002786299,0.00060042395],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022621378,0.00008152893,0.00071053713,0.00017990611,0.000034277215,0.00011519822,0.00067860057,0.072256505,0.0011824806,0.8788419,0.0010565846,0.044839825],"study_design_scores_gemma":[0.00003258151,0.00019060358,0.00053611916,0.00022454288,0.00006330739,0.00017395781,0.00063605397,0.21697268,0.0023989908,0.7422109,0.03649274,0.00006751065],"about_ca_topic_score_codex":0.002519645,"about_ca_topic_score_gemma":0.00414111,"teacher_disagreement_score":0.0082059475,"about_ca_system_score_codex":0.005239649,"about_ca_system_score_gemma":0.005064874,"threshold_uncertainty_score":0.043397725},"labels":[],"label_agreement":null},{"id":"W2895994267","doi":"10.1007/978-3-030-00220-6_103","title":"Lessons Learned from a Multi-year Initiative to Integrate Data-Driven Design Using BIM into Undergraduate Architectural Education","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Curriculum; Building information modeling; Engineering management; Studio; Design studio; Engineering; Computer science; Systems engineering; Software engineering; Pedagogy; Psychology","score_opus":0.17810457182510084,"score_gpt":0.32544082002835256,"score_spread":0.14733624820325172,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2895994267","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18398581,0.010130884,0.056342084,0.26539108,0.0071745533,0.000526479,0.00038847973,0.0010413763,0.4750193],"genre_scores_gemma":[0.4156188,0.008668038,0.109361805,0.024218783,0.00058988685,0.0004110029,0.00058177725,0.00059118634,0.4399587],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99654984,0.0014562425,0.00009773706,0.00031076864,0.0011125677,0.0004728458],"domain_scores_gemma":[0.9970571,0.0005525242,0.00007781663,0.00017485047,0.0006844726,0.0014531539],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007869142,0.00046605416,0.00027470992,0.0006098888,0.003520003,0.007657235,0.0016230451,0.0021296428,0.008120067],"category_scores_gemma":[0.0047595934,0.00028818796,0.00030904028,0.0009022085,0.001904304,0.004478841,0.006282083,0.003955687,0.0025440739],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009210123,0.0023809012,0.0042838203,0.00040362377,0.000012855479,0.00205728,0.060288213,0.0011623417,0.0035658386,0.06328107,0.1853175,0.6771544],"study_design_scores_gemma":[0.000025998437,0.0002424864,0.0036236322,0.00050281954,0.0000073275614,0.0010569823,0.05283969,0.0006402975,0.00223823,0.01912949,0.9196439,0.000049183167],"about_ca_topic_score_codex":0.0054322476,"about_ca_topic_score_gemma":0.026956396,"teacher_disagreement_score":0.008120067,"about_ca_system_score_codex":0.0036247787,"about_ca_system_score_gemma":0.0075392057,"threshold_uncertainty_score":0.0416165},"labels":[],"label_agreement":null},{"id":"W2896343837","doi":"10.1121/1.5068403","title":"Compatibility study between building information modeling and acoustic simulation software","year":2018,"lang":"en","type":"article","venue":"The Journal of the Acoustical Society of America","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Reverberation; Interoperability; Software; Process (computing); Visualization; Simulation software; Building information modeling; Acoustics; Human–computer interaction; Compatibility (geochemistry); Data mining; Engineering; World Wide Web","score_opus":0.015356875680017548,"score_gpt":0.25808836315870287,"score_spread":0.24273148747868534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896343837","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.60096323,0.00020507553,0.37949896,0.0003109566,0.00008722938,0.000624816,0.00032508987,0.0021555508,0.015829118],"genre_scores_gemma":[0.9022863,0.00010597415,0.09486299,0.000047346595,0.000017498021,0.00024430035,0.0005590411,0.00029006018,0.0015865674],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9878714,0.0060682623,0.0014963393,0.0008965317,0.0032260602,0.00044143756],"domain_scores_gemma":[0.96606547,0.02345174,0.0013683119,0.0029796478,0.0058040363,0.0003308428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015945371,0.000557859,0.00046370423,0.003030407,0.0005812246,0.0028843938,0.0011908171,0.0007844069,0.004067987],"category_scores_gemma":[0.04907021,0.000616864,0.0009330711,0.002047739,0.00068496855,0.0037855513,0.002451824,0.00067669747,0.0009890298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039427453,0.0024129094,0.32309374,0.0011706946,0.00049973215,0.0025261717,0.013689638,0.065669335,0.09305645,0.06696886,0.0033983293,0.42357135],"study_design_scores_gemma":[0.00019495937,0.0025397446,0.0948313,0.00032642763,0.0005378039,0.0012093943,0.0060992455,0.73464483,0.12071277,0.010095616,0.02863406,0.00017383376],"about_ca_topic_score_codex":0.002154525,"about_ca_topic_score_gemma":0.0010786924,"teacher_disagreement_score":0.015945371,"about_ca_system_score_codex":0.00057616923,"about_ca_system_score_gemma":0.0012953392,"threshold_uncertainty_score":0.084328234},"labels":[],"label_agreement":null},{"id":"W2896377197","doi":"10.1007/978-3-319-97846-8_7","title":"The Entries of EDMs","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Matrix (chemical analysis); Current (fluid); Value (mathematics); Zero (linguistics); Mathematics; Computer science; Algorithm; Combinatorics; Pure mathematics; Engineering; Statistics; Electrical engineering; Materials science","score_opus":0.00632551423250638,"score_gpt":0.17086861082310056,"score_spread":0.16454309659059418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896377197","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00068615586,0.008237012,0.0075571076,0.002318451,0.0022740136,0.000021400643,0.00041766043,0.00034895868,0.9781392],"genre_scores_gemma":[0.006370637,0.0051646177,0.00393064,0.00066904275,0.00042252493,0.000030255256,0.0005415754,0.00038589304,0.9824849],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955314,0.00009152507,0.000026358694,0.00006801476,0.0002184851,0.000042450945],"domain_scores_gemma":[0.99970824,0.00009288545,0.00001118392,0.00005580171,0.00010268919,0.000029152152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050077745,0.00076878397,0.00044269869,0.0021686535,0.0012563572,0.0046342053,0.0008673663,0.0011549768,0.13681917],"category_scores_gemma":[0.0016199766,0.00030312192,0.000297112,0.0031062074,0.0011534321,0.005169504,0.0020521786,0.0019880428,0.041426018],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019115767,0.000018174896,0.000074334435,0.00015003531,0.0000023195876,0.000058806247,0.0005365321,0.00024846545,0.00029171273,0.4095238,0.38714275,0.20193386],"study_design_scores_gemma":[5.718844e-7,0.0000016920849,0.000032142405,0.000059782902,5.5339046e-7,0.000029244287,0.000071177536,0.000046792396,0.000068400775,0.009944447,0.98974353,0.0000018231702],"about_ca_topic_score_codex":0.002172976,"about_ca_topic_score_gemma":0.00579877,"teacher_disagreement_score":0.13681917,"about_ca_system_score_codex":0.0016048859,"about_ca_system_score_gemma":0.0012315572,"threshold_uncertainty_score":0.45770574},"labels":[],"label_agreement":null},{"id":"W2896896777","doi":"10.22260/isarc2018/0170","title":"Utilization of Virtual Reality Visualizations on Heavy Mobile Crane Planning for Modular Construction","year":2018,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Lift (data mining); Modular design; Virtual reality; Visualization; Computer science; Virtual machine; Process (computing); Human–computer interaction; Heavy equipment; Engineering; Construction engineering; Simulation; Automotive engineering","score_opus":0.029810655025678194,"score_gpt":0.2850040056296489,"score_spread":0.2551933506039707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2896896777","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15704957,0.00032000907,0.8240906,0.00019683344,0.00006674286,0.00012070297,0.00027598953,0.0038119382,0.014067677],"genre_scores_gemma":[0.7842883,0.0005676525,0.21216452,0.000025049907,0.000013551381,0.000091283546,0.00020986857,0.00020504901,0.002434677],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997938,0.00008141833,0.000008762633,0.000028804328,0.00006526574,0.000021783968],"domain_scores_gemma":[0.9997179,0.00013606706,0.000022782087,0.000055308305,0.000045658977,0.000022291873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030483032,0.00067790423,0.00028602415,0.00061595306,0.00023256107,0.00085842196,0.00051194476,0.00050983665,0.004571928],"category_scores_gemma":[0.00079922297,0.00041116378,0.0005629521,0.00040091897,0.00035827144,0.00055414706,0.0008907201,0.00037890617,0.0005311655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027546447,0.00026539812,0.002200575,0.0003885917,0.000047476242,0.0006348575,0.0012100607,0.730338,0.055205923,0.008169379,0.002341169,0.19892319],"study_design_scores_gemma":[0.00005141581,0.00031181145,0.0035391955,0.000087790155,0.000049311984,0.00034717505,0.00031640692,0.9566192,0.023579616,0.0020945726,0.012912486,0.00009096672],"about_ca_topic_score_codex":0.0023438793,"about_ca_topic_score_gemma":0.0028220734,"teacher_disagreement_score":0.004571928,"about_ca_system_score_codex":0.0001836425,"about_ca_system_score_gemma":0.00041783167,"threshold_uncertainty_score":0.015294552},"labels":[],"label_agreement":null},{"id":"W2897432083","doi":"10.22260/isarc2018/0124","title":"BIM-based Surface-Specific Solar Simulation of Buildings","year":2018,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Photovoltaic system; Photovoltaic mounting system; Architectural engineering; Building envelope; Computer science; Building-integrated photovoltaics; Solar energy; Building information modeling; Rooftop photovoltaic power station; Electricity generation; Environmental science; Engineering; Power (physics); Meteorology; Electrical engineering","score_opus":0.012807934224371448,"score_gpt":0.21198934416108395,"score_spread":0.1991814099367125,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897432083","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.23911804,0.00044614833,0.70580125,0.0003961886,0.00017386176,0.00029194582,0.00447792,0.005486991,0.043807708],"genre_scores_gemma":[0.8703374,0.00031125318,0.12097692,0.00009679968,0.000021168284,0.0003517807,0.0026428227,0.0003313017,0.004930493],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975866,0.00005828426,0.000013490664,0.000030288847,0.00009716197,0.000042149786],"domain_scores_gemma":[0.9995933,0.0002032464,0.000025842466,0.000039521383,0.00009120445,0.000046864152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041098782,0.00079602073,0.00093150407,0.00075926236,0.0005961813,0.0013414666,0.0013288528,0.001297484,0.005892001],"category_scores_gemma":[0.00095833064,0.00053519075,0.0012015862,0.0010424679,0.0005020136,0.0005513521,0.0011635881,0.00079187774,0.0008355022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017615803,0.000021892423,0.0004353644,0.000024235385,0.000008790275,0.00003216266,0.000021569402,0.9946683,0.00042447387,0.0009836258,0.00028682456,0.0030751764],"study_design_scores_gemma":[0.000003647881,0.0000031079417,0.00007523092,0.0000020370835,0.0000016197226,0.0000055450823,0.000008418382,0.9989374,0.00020614127,0.00031612412,0.00043817615,0.0000025944853],"about_ca_topic_score_codex":0.016824229,"about_ca_topic_score_gemma":0.016773462,"teacher_disagreement_score":0.016824229,"about_ca_system_score_codex":0.0008178564,"about_ca_system_score_gemma":0.0010423398,"threshold_uncertainty_score":0.03345257},"labels":[],"label_agreement":null},{"id":"W2897513707","doi":"10.3311/ccc2018-075","title":"Involving knowledge of construction and facilities management in design through the BIM approach","year":2018,"lang":"en","type":"article","venue":"Creative Construction Conference 2018 - Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; Queen's University; Queen's University Belfast","keywords":"Computer science; Systems engineering; Knowledge management; Construction engineering; Engineering management; Engineering","score_opus":0.041962756246215836,"score_gpt":0.24421850918863858,"score_spread":0.20225575294242273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897513707","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16084544,0.0051831575,0.40520066,0.008852217,0.00019221206,0.0009677508,0.0002612575,0.00015423875,0.41834304],"genre_scores_gemma":[0.78514725,0.0029728597,0.19266276,0.0008288971,0.00004634365,0.0006563191,0.00019366363,0.000057619585,0.017434346],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9817228,0.0146578215,0.00038181312,0.0005767637,0.0020059166,0.0006549278],"domain_scores_gemma":[0.9908167,0.0071443575,0.0004585541,0.00081362517,0.0005039124,0.00026285878],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010268079,0.0007333286,0.00044848528,0.004174577,0.0033822288,0.008110975,0.0018903076,0.0020983177,0.005457838],"category_scores_gemma":[0.009901317,0.0005593899,0.000554602,0.003841779,0.008773049,0.00758165,0.0068469094,0.002088023,0.0007605361],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009626796,0.0004492487,0.004761149,0.0014171657,0.00004769534,0.0010811896,0.2860415,0.007029647,0.0034391691,0.43963072,0.004094288,0.25191194],"study_design_scores_gemma":[0.00004124277,0.00022866207,0.0071329135,0.0030429123,0.00006932111,0.0018421069,0.27542967,0.007920564,0.00405251,0.2756945,0.42444032,0.00010523988],"about_ca_topic_score_codex":0.0034603144,"about_ca_topic_score_gemma":0.0062511386,"teacher_disagreement_score":0.010268079,"about_ca_system_score_codex":0.0069436934,"about_ca_system_score_gemma":0.007950418,"threshold_uncertainty_score":0.054303408},"labels":[],"label_agreement":null},{"id":"W2897628261","doi":"10.1016/j.aei.2018.10.003","title":"Random generation of industrial pipelines’ data using Markov chain model","year":2018,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Pipeline transport; Markov chain; Pipeline (software); Computer science; Process (computing); Markov process; Data mining; Markov model; Engineering; Statistics; Machine learning; Mathematics; Mechanical engineering","score_opus":0.048902363377067194,"score_gpt":0.2463009613770248,"score_spread":0.19739859799995763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897628261","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1687974,0.00029724676,0.8233059,0.0005704017,0.00012441637,0.00028449105,0.0032972377,0.0018300515,0.001492902],"genre_scores_gemma":[0.8929088,0.0002484132,0.09417128,0.00008941339,0.00005096614,0.00034374124,0.00950152,0.00011274771,0.002573013],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983742,0.0005029122,0.00008960144,0.0004868044,0.00039544416,0.00015093412],"domain_scores_gemma":[0.99085945,0.006093467,0.00047543194,0.0014196659,0.0009560965,0.00019596667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035372204,0.0005666491,0.0007323003,0.0019347867,0.00046119836,0.00089692866,0.0018935031,0.0012560706,0.0032055276],"category_scores_gemma":[0.011470879,0.0009161098,0.0012497219,0.0021111288,0.00091135636,0.0019277115,0.0013126875,0.0015313384,0.0009403859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004904479,0.00015168883,0.009927872,0.00012232989,0.00007649196,0.000301749,0.00012857984,0.9191213,0.002445026,0.023937052,0.002874967,0.0404225],"study_design_scores_gemma":[0.000016941027,0.00002073709,0.00070424326,0.000007985214,0.000008865342,0.000030896645,0.000010097703,0.992481,0.0007890367,0.0054602847,0.00045743652,0.000012435344],"about_ca_topic_score_codex":0.009335948,"about_ca_topic_score_gemma":0.008487911,"teacher_disagreement_score":0.009335948,"about_ca_system_score_codex":0.001182784,"about_ca_system_score_gemma":0.0015497392,"threshold_uncertainty_score":0.018706858},"labels":[],"label_agreement":null},{"id":"W2897774673","doi":"10.1007/978-3-030-00220-6_41","title":"Towards Automated Analysis of Ambiguity in Modular Construction Contract Documents (A Qualitative &amp; Quantitative Study)","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ambiguity; Modular design; Computer science; Programming language","score_opus":0.034627910572905395,"score_gpt":0.33285407371235065,"score_spread":0.2982261631394453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2897774673","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5375405,0.0015139685,0.42846644,0.0009112926,0.000043167667,0.0006375711,0.0017394217,0.00090916065,0.028238406],"genre_scores_gemma":[0.7136796,0.0005119277,0.27715087,0.000103922575,0.000015895406,0.00038973326,0.0012550827,0.00023919053,0.006653826],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9921187,0.0032234956,0.00037121706,0.00064400653,0.0033345877,0.00030791975],"domain_scores_gemma":[0.97782886,0.015207156,0.0014240042,0.0015972665,0.0037998133,0.00014293213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071051493,0.00036203486,0.00031321694,0.003723845,0.0010784997,0.0046467483,0.0009718534,0.0008552811,0.0028337245],"category_scores_gemma":[0.021886481,0.00043541822,0.0003342601,0.004330708,0.0019707473,0.004222439,0.0023135154,0.0011147286,0.0009246027],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033572828,0.0007121042,0.0462346,0.0014293845,0.000059312933,0.0005581606,0.06663358,0.015614618,0.045316588,0.08311302,0.00973995,0.7302529],"study_design_scores_gemma":[0.00009523306,0.00058133306,0.17659594,0.0016220367,0.00016078344,0.0029458783,0.09008813,0.286617,0.1650149,0.1543322,0.121565074,0.00038151446],"about_ca_topic_score_codex":0.00631309,"about_ca_topic_score_gemma":0.0059730974,"teacher_disagreement_score":0.0071051493,"about_ca_system_score_codex":0.002107334,"about_ca_system_score_gemma":0.0024926234,"threshold_uncertainty_score":0.03757614},"labels":[],"label_agreement":null},{"id":"W2898328996","doi":"10.29173/mocs172","title":"Permanent Modular Construction: Construction Performance","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Modular construction; Sample (material); Construction industry; Computer science; Construction management; Test (biology); Engineering; Construction engineering; Civil engineering","score_opus":0.011126353265989914,"score_gpt":0.1857710283249126,"score_spread":0.1746446750589227,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898328996","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9763035,0.000098249584,0.0030962403,0.000060236587,0.000012732733,0.00006715098,0.00033895657,0.00009720705,0.019925745],"genre_scores_gemma":[0.99585515,0.0000621865,0.00165044,0.00000578135,0.0000057977923,0.000014565881,0.00029310587,0.000033637953,0.0020791763],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946753,0.00093253196,0.00023630077,0.00038353956,0.0033354084,0.00043698327],"domain_scores_gemma":[0.98955125,0.0030629789,0.0025981804,0.0010517791,0.0030449566,0.00069088617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044776015,0.0006078065,0.00033010426,0.0017732641,0.00061456684,0.0015548837,0.00086010207,0.0004489451,0.007630033],"category_scores_gemma":[0.014802755,0.00021649576,0.00034994082,0.0018756909,0.0010972244,0.0013321565,0.0014925238,0.00040151222,0.0016232089],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019116262,0.0013486602,0.55745184,0.0007398616,0.00015575695,0.0004716582,0.004010737,0.031162659,0.02525477,0.0041588433,0.004421465,0.36891207],"study_design_scores_gemma":[0.000032784275,0.006520517,0.9338955,0.00010610827,0.000101216116,0.001126292,0.0051387344,0.0141087845,0.022627972,0.0015972267,0.014646469,0.00009838159],"about_ca_topic_score_codex":0.0033646773,"about_ca_topic_score_gemma":0.0053057964,"teacher_disagreement_score":0.007630033,"about_ca_system_score_codex":0.0015391038,"about_ca_system_score_gemma":0.0011130123,"threshold_uncertainty_score":0.025524974},"labels":[],"label_agreement":null},{"id":"W2898373675","doi":"10.1111/mice.12420","title":"Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects","year":2018,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":26,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Earthworks; Automated planning and scheduling; Testbed; Planner; Plan (archaeology); Computer science; Robotics; Site plan; Project management; Scheduling (production processes); Project planning; Systems engineering; Engineering; Software engineering; Artificial intelligence; Robot; Urban planning; Regional planning; Civil engineering; Operations management","score_opus":0.010095544581944556,"score_gpt":0.20389085064382864,"score_spread":0.19379530606188408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2898373675","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006024093,0.000116743,0.986356,0.00007849244,0.000026880225,0.000057937108,0.00022737635,0.00053149427,0.0065809786],"genre_scores_gemma":[0.35280645,0.00039965613,0.63833064,0.0000842618,0.00002132785,0.00036222738,0.0006337343,0.00013363142,0.007228033],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995726,0.00009198363,0.000021798329,0.00009328268,0.00017681981,0.000043518252],"domain_scores_gemma":[0.9997669,0.00009079258,0.000020419518,0.000031111824,0.0000762496,0.00001458727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00044892114,0.0006678524,0.0009273147,0.0012935571,0.0005607989,0.0014169276,0.0016820529,0.0007507742,0.0050557028],"category_scores_gemma":[0.0008162993,0.0007490034,0.0011570052,0.0019394848,0.00063510466,0.0009530793,0.000843524,0.0007872412,0.0007090917],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020390342,0.00002618911,0.00023519518,0.00007487618,0.00002601342,0.0000590447,0.000040998137,0.94128937,0.00088973617,0.019353274,0.0008351633,0.037149716],"study_design_scores_gemma":[0.0000035785795,0.000009280942,0.00007784909,0.000007354135,0.000011035034,0.000012424771,0.000010918428,0.9918527,0.00050370686,0.006306811,0.0011998813,0.0000044783505],"about_ca_topic_score_codex":0.038573697,"about_ca_topic_score_gemma":0.04853211,"teacher_disagreement_score":0.038573697,"about_ca_system_score_codex":0.0017631425,"about_ca_system_score_gemma":0.0031842268,"threshold_uncertainty_score":0.0766983},"labels":[],"label_agreement":null},{"id":"W2900196809","doi":"10.1108/f-04-2017-0045","title":"Lean-Agile FM-BIM: a demonstrated approach","year":2018,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":39,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Agile software development; Facility management; Building information modeling; Asset (computer security); Computer science; Systems engineering; Asset management; Ontology; Process management; Engineering; Software engineering; Operations management","score_opus":0.01294135172526372,"score_gpt":0.19135132395433413,"score_spread":0.1784099722290704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2900196809","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028024655,0.00022687744,0.9232241,0.0013890587,0.000064850945,0.00039277054,0.00010437599,0.0011030765,0.045470353],"genre_scores_gemma":[0.21415944,0.0002561114,0.77824956,0.00032221904,0.000018339162,0.00035938388,0.00018944195,0.00017911407,0.006266386],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9932017,0.0033549864,0.000232348,0.0005736605,0.0022099528,0.00042749383],"domain_scores_gemma":[0.99577016,0.0014442423,0.000252222,0.0013339922,0.000836459,0.0003628493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00703609,0.000866731,0.00033768508,0.0015136199,0.001419762,0.0045739883,0.0027556575,0.0014952153,0.0040275627],"category_scores_gemma":[0.0077558197,0.0005485836,0.0008246526,0.0012367106,0.0031595358,0.0035038798,0.009300008,0.0019488827,0.0014411507],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022966233,0.0006951362,0.007993315,0.0009765426,0.00009759164,0.0018412236,0.012813257,0.051262937,0.019714436,0.46825796,0.008155748,0.4279623],"study_design_scores_gemma":[0.0001699248,0.0010207844,0.0044073164,0.0013023803,0.00013223317,0.00385919,0.012511761,0.26828837,0.039112695,0.29602146,0.37295276,0.00022113297],"about_ca_topic_score_codex":0.0018806563,"about_ca_topic_score_gemma":0.0028130622,"teacher_disagreement_score":0.00703609,"about_ca_system_score_codex":0.0019074287,"about_ca_system_score_gemma":0.0033483813,"threshold_uncertainty_score":0.037210822},"labels":[],"label_agreement":null},{"id":"W2901090113","doi":"10.1108/bepam-01-2018-0002","title":"BIM-based energy consumption assessment of the on-site construction of building structural systems","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Energy consumption; Structural system; Building information modeling; Key (lock); Productivity; Consumption (sociology); Environmental impact assessment; Computer science; Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","score_opus":0.011006315260174745,"score_gpt":0.23596213145226239,"score_spread":0.22495581619208765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901090113","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68188554,0.0001865737,0.2803039,0.00010944164,0.00003236209,0.00034955874,0.0043616886,0.0017110658,0.03105983],"genre_scores_gemma":[0.9331816,0.0001240237,0.0627722,0.000013742731,0.000004338147,0.0001409687,0.0018809964,0.00008967739,0.0017925157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989743,0.00020963223,0.000036806672,0.00007679104,0.0006446157,0.000057810837],"domain_scores_gemma":[0.99932814,0.0001781972,0.00007402898,0.000115719056,0.0002778345,0.00002615439],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007788939,0.00068062736,0.00038594494,0.0029506288,0.00031158718,0.0010153425,0.00063358934,0.00039183776,0.0029627457],"category_scores_gemma":[0.001631886,0.00024543592,0.0005748481,0.0020299444,0.0002132392,0.0010394447,0.00081775314,0.00023062411,0.00090784376],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033803182,0.00062931055,0.06849751,0.0005648392,0.0001506237,0.00025571426,0.0004515035,0.52857924,0.026301906,0.006055966,0.0038885805,0.36428678],"study_design_scores_gemma":[0.0000132423875,0.00017644145,0.05525029,0.00005875077,0.000050063973,0.00016699694,0.00044087676,0.9074187,0.028643932,0.0023694125,0.0053632213,0.000048052934],"about_ca_topic_score_codex":0.0035657843,"about_ca_topic_score_gemma":0.0060722274,"teacher_disagreement_score":0.0035657843,"about_ca_system_score_codex":0.00071129133,"about_ca_system_score_gemma":0.0006492395,"threshold_uncertainty_score":0.009911358},"labels":[],"label_agreement":null},{"id":"W2901529558","doi":"10.1108/978-1-78769-793-520181011","title":"Analyzing the Documents Accompanying Decisions","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Computer science; Information retrieval; Data science; History","score_opus":0.02004260240634036,"score_gpt":0.23652716681718255,"score_spread":0.21648456441084218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901529558","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05405282,0.0047587743,0.16410436,0.010165266,0.0011240699,0.00052629865,0.0045193695,0.0018775217,0.7588715],"genre_scores_gemma":[0.3775717,0.00880192,0.2663339,0.0012732712,0.00046625317,0.00033816395,0.01072362,0.00312366,0.33136743],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9954723,0.0014404325,0.0002357776,0.00046182255,0.0020990283,0.00029060774],"domain_scores_gemma":[0.99083763,0.005748764,0.0005252473,0.0011088945,0.0016614299,0.00011802797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003707762,0.0008291463,0.00038642832,0.005354855,0.002647461,0.013381696,0.0012887954,0.0016402182,0.028252514],"category_scores_gemma":[0.02076502,0.00045442226,0.0004172221,0.009995025,0.002945027,0.009093485,0.0023380604,0.002085876,0.008572199],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099522906,0.00007755858,0.0019080408,0.00050548365,0.000019337034,0.0009830337,0.019818855,0.0015851316,0.0032001263,0.44623512,0.071044825,0.45452294],"study_design_scores_gemma":[0.000009126685,0.000015498712,0.0018454881,0.0005651519,0.00002520052,0.0003465979,0.0134511525,0.0024095322,0.0052356543,0.1126231,0.86344284,0.000030695293],"about_ca_topic_score_codex":0.00743323,"about_ca_topic_score_gemma":0.010635875,"teacher_disagreement_score":0.028252514,"about_ca_system_score_codex":0.004169435,"about_ca_system_score_gemma":0.004694097,"threshold_uncertainty_score":0.09451407},"labels":[],"label_agreement":null},{"id":"W2901878489","doi":"10.1108/jchmsd-09-2018-0067","title":"Level of detail, information and accuracy in building information modelling of existing and heritage buildings","year":2018,"lang":"en","type":"article","venue":"Journal of Cultural Heritage Management and Sustainable Development","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Building information modeling; Documentation; Context (archaeology); Information model; Architecture; Engineering management; Benchmark (surveying); Computer science; Integrated project delivery; Construction engineering; Work (physics); Originality; Architectural engineering; Systems engineering; Engineering; Facility management; Software engineering; Project management; Operations management; Business","score_opus":0.03416205905837242,"score_gpt":0.2396245467576982,"score_spread":0.2054624876993258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2901878489","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49529433,0.002760779,0.40496442,0.0022011336,0.0001644226,0.0008250839,0.0026172968,0.0016045935,0.08956794],"genre_scores_gemma":[0.8822311,0.0005749865,0.11410071,0.0000863983,0.0000140076745,0.00014580444,0.0011950452,0.00015641192,0.0014956611],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9811963,0.005797856,0.0013821322,0.00087516377,0.010069102,0.0006796232],"domain_scores_gemma":[0.97946596,0.009984922,0.0016143633,0.003559926,0.004961247,0.00041361173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013493533,0.0006526604,0.0006590638,0.005331513,0.0010584207,0.009918202,0.0013475529,0.0010746513,0.0021438673],"category_scores_gemma":[0.039232288,0.00054657937,0.0010808752,0.0050810254,0.0033118734,0.006589329,0.0041960687,0.0012181927,0.00043970818],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007264316,0.0002881694,0.18822613,0.001727749,0.00030124732,0.00043643362,0.017533848,0.2552127,0.0084231105,0.1724559,0.006356564,0.34831166],"study_design_scores_gemma":[0.0000583064,0.00085024675,0.21797931,0.0044113738,0.0006062747,0.00089908164,0.025106298,0.45752394,0.038470834,0.09664151,0.15669136,0.00076146063],"about_ca_topic_score_codex":0.03388018,"about_ca_topic_score_gemma":0.030803405,"teacher_disagreement_score":0.03388018,"about_ca_system_score_codex":0.0055510965,"about_ca_system_score_gemma":0.003967394,"threshold_uncertainty_score":0.07136148},"labels":[],"label_agreement":null},{"id":"W2902687294","doi":"10.29173/mocs52","title":"Manufacturing of modular buildings: a literature review","year":2017,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Factory (object-oriented programming); Process (computing); Field (mathematics); Manufacturing engineering; Productivity; Engineering; Systems engineering; Advanced manufacturing; Computer science; Process management; Engineering management","score_opus":0.020615670465966136,"score_gpt":0.2617338821326967,"score_spread":0.2411182116667306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2902687294","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00024000072,0.99819046,0.0001683045,0.0002164123,0.00008338306,0.00001599104,0.000048595513,0.000005689483,0.0010311956],"genre_scores_gemma":[0.0012355879,0.99816173,0.00029958287,0.00009340828,0.000039384213,0.000012050159,0.00004212201,0.0000015324983,0.000114661336],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989642,0.00022129847,0.00025302498,0.00013660941,0.00036475583,0.000060081227],"domain_scores_gemma":[0.9958859,0.0028174638,0.0005030505,0.000075613214,0.00063653797,0.000081452075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016633983,0.0011873133,0.0016077383,0.009405292,0.0005896956,0.002146277,0.0015493673,0.0013814252,0.0062892823],"category_scores_gemma":[0.0047500706,0.00060872827,0.0015173972,0.011506652,0.000700642,0.002558543,0.0010545915,0.0009807934,0.0009820202],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058731806,0.00007488451,0.00055420096,0.29321906,0.00031173596,0.00039082425,0.0005803502,0.0006836573,0.0005358928,0.00594133,0.020697407,0.67695194],"study_design_scores_gemma":[0.000013866483,0.000100302874,0.003170385,0.21501395,0.0011785702,0.0014254018,0.0007757235,0.00018486475,0.00040199587,0.002477316,0.775216,0.000041701074],"about_ca_topic_score_codex":0.00540224,"about_ca_topic_score_gemma":0.009665254,"teacher_disagreement_score":0.009405292,"about_ca_system_score_codex":0.0013651457,"about_ca_system_score_gemma":0.005797201,"threshold_uncertainty_score":0.021039724},"labels":[],"label_agreement":null},{"id":"W2903256777","doi":"10.1108/bepam-02-2018-0046","title":"Analysis of BIM use for asset management in three public organizations in Québec, Canada","year":2018,"lang":"en","type":"article","venue":"Built Environment Project and Asset Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; HEC Montréal","funders":"","keywords":"Asset (computer security); Building information modeling; Originality; Asset management; Knowledge management; Nuclear decommissioning; Process management; Engineering; Engineering management; Computer science; Business; Operations management","score_opus":0.014407438424904159,"score_gpt":0.21106674948479606,"score_spread":0.1966593110598919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903256777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.988636,0.0001844123,0.0008619734,0.0003922579,0.0000057446696,0.00017459989,0.0005194387,0.000038968312,0.009186599],"genre_scores_gemma":[0.99441624,0.00014208819,0.0011777284,0.000066193505,0.0000015724069,0.000061444414,0.00035134397,0.000014117786,0.0037693456],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99742305,0.00047058586,0.00007031835,0.0002579781,0.00093185244,0.00084635126],"domain_scores_gemma":[0.9934995,0.0012767464,0.00059775275,0.00026896,0.003401074,0.00095601863],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025223035,0.00041741625,0.00035684387,0.0021458974,0.007541361,0.002685314,0.0014258709,0.0006269941,0.0037133622],"category_scores_gemma":[0.0053343275,0.0003449997,0.0002651944,0.0046912776,0.0021522462,0.0007075924,0.0019322543,0.0006132664,0.00023194039],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005641785,0.00094295875,0.544431,0.0005371501,0.00012292562,0.0032149341,0.20185046,0.0051107933,0.006311601,0.0077194963,0.010802454,0.21839198],"study_design_scores_gemma":[0.000019454405,0.0001860433,0.7257034,0.00020769463,0.000039511793,0.00017492326,0.23537219,0.004765762,0.0012191935,0.00022598982,0.032021247,0.00006446738],"about_ca_topic_score_codex":0.98883724,"about_ca_topic_score_gemma":0.9960062,"teacher_disagreement_score":0.08468747,"about_ca_system_score_codex":0.08468747,"about_ca_system_score_gemma":0.07149328,"threshold_uncertainty_score":0.6144535},"labels":[],"label_agreement":null},{"id":"W2903887606","doi":"10.3390/buildings8120178","title":"Automation of Measuring Actual Productivity of Earthwork in Urban Area, a Case Study from Montreal","year":2018,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Earthworks; Global Positioning System; Productivity; Automation; Duration (music); Engineering; Transport engineering; Operations research; Civil engineering; Computer science; Industrial engineering; Telecommunications","score_opus":0.014332748805983704,"score_gpt":0.21043914308601125,"score_spread":0.19610639428002755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903887606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97479033,0.00008592645,0.019751979,0.00010493767,0.0000071602403,0.00027600583,0.0008198378,0.00024042453,0.0039233314],"genre_scores_gemma":[0.98409134,0.00007877904,0.014222943,0.000007366472,0.0000020939235,0.000053106065,0.0003282147,0.000013777128,0.0012024903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99936754,0.0001383565,0.000039182545,0.00014759159,0.00022275551,0.0000845146],"domain_scores_gemma":[0.99886835,0.0003391292,0.00016064613,0.00010133235,0.0004579932,0.00007265653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096241065,0.00060038955,0.00026674758,0.0011694763,0.00079856894,0.0008680248,0.00087174104,0.00037690403,0.0008292731],"category_scores_gemma":[0.0024318437,0.00021173754,0.00026604353,0.00212929,0.00049836934,0.00038179933,0.00043071,0.00021023379,0.00009278672],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005015935,0.00069687655,0.28638676,0.00066941534,0.00017579677,0.006032307,0.0070327725,0.3900784,0.054496147,0.005418233,0.0035435755,0.24496813],"study_design_scores_gemma":[0.00009342589,0.00060535705,0.42031166,0.000072571114,0.000102175094,0.00036256947,0.0064305756,0.54300207,0.020683939,0.0005309525,0.007689774,0.00011480047],"about_ca_topic_score_codex":0.71782404,"about_ca_topic_score_gemma":0.8192417,"teacher_disagreement_score":0.28217596,"about_ca_system_score_codex":0.0065465923,"about_ca_system_score_gemma":0.0043271626,"threshold_uncertainty_score":0.5676755},"labels":[],"label_agreement":null},{"id":"W2903926597","doi":"10.1007/978-3-030-01614-2_3","title":"Environmental Factors on Concept Maps Design","year":2018,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; École de Technologie Supérieure","funders":"McGill University","keywords":"Computer science; Knowledge management; Building information modeling; Work (physics); Quality (philosophy); Ontology; Data science; Engineering","score_opus":0.007490954964346386,"score_gpt":0.20051893267809245,"score_spread":0.19302797771374608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2903926597","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050907124,0.017250502,0.23934059,0.0027705573,0.00074260536,0.00008514723,0.0001288562,0.0001682847,0.6886063],"genre_scores_gemma":[0.80551267,0.015097304,0.06442034,0.00020621336,0.00026697674,0.00012007848,0.000117452575,0.00034357863,0.11391545],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993351,0.00032566674,0.000016468524,0.000050508388,0.00021184974,0.00006039162],"domain_scores_gemma":[0.99850696,0.0011706465,0.000036316724,0.00005157667,0.00020017239,0.00003423423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011096215,0.00074394175,0.00023330908,0.0011059117,0.0009427102,0.0036118822,0.0007410079,0.0007330205,0.01402322],"category_scores_gemma":[0.0041514644,0.00044904655,0.00025460048,0.0019683046,0.0024013002,0.0025177367,0.0011141776,0.0009329853,0.0010795015],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042341715,0.000029102672,0.0005205913,0.00019583634,0.000012170735,0.00017594143,0.0020781413,0.021499136,0.0006854604,0.79398155,0.005626406,0.17515337],"study_design_scores_gemma":[0.000013282576,0.00004932563,0.0016499328,0.0004030762,0.000025492856,0.00017998947,0.0028270262,0.015818704,0.0027202016,0.69604367,0.28023237,0.00003701065],"about_ca_topic_score_codex":0.0048838155,"about_ca_topic_score_gemma":0.00754598,"teacher_disagreement_score":0.01402322,"about_ca_system_score_codex":0.0019146649,"about_ca_system_score_gemma":0.00091008417,"threshold_uncertainty_score":0.046912313},"labels":[],"label_agreement":null},{"id":"W2905178858","doi":"","title":"An integrated simulation model for site layout planning of tunnelling projects","year":2014,"lang":"en","type":"article","venue":"Northumbria Research Link (Northumbria University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Quantum tunnelling; Geology; Computer science; Construction engineering; Engineering","score_opus":0.06467313376961577,"score_gpt":0.29899372809522323,"score_spread":0.23432059432560748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905178858","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06397273,0.00028438246,0.9015384,0.00029379755,0.00007196502,0.00015045788,0.0010585652,0.0012570214,0.031372715],"genre_scores_gemma":[0.80106795,0.00070748513,0.1768476,0.00007197729,0.000029424984,0.00069510384,0.0014824088,0.000248844,0.018849226],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972075,0.00009348943,0.00002088834,0.00004705155,0.000078733945,0.000039089777],"domain_scores_gemma":[0.999655,0.00015974954,0.00003591478,0.000029871044,0.000087976754,0.000031513304],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004560039,0.0006379356,0.0007827869,0.00074100896,0.0006063675,0.001307835,0.001261279,0.0011620605,0.005602676],"category_scores_gemma":[0.0009806084,0.0006887144,0.0010530445,0.001027111,0.0004793786,0.0009129777,0.0009064763,0.000741431,0.000670733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011870214,0.000010885512,0.00018846302,0.000008872871,0.000005547234,0.000022682965,0.000017769764,0.9942801,0.00030952963,0.0032906379,0.0001340802,0.001719454],"study_design_scores_gemma":[0.0000050712283,0.0000062059908,0.000047183406,0.0000033406793,0.0000037074558,0.0000057468383,0.0000053097688,0.9982768,0.00012708505,0.000682166,0.0008338603,0.0000033937176],"about_ca_topic_score_codex":0.01877118,"about_ca_topic_score_gemma":0.0143832015,"teacher_disagreement_score":0.01877118,"about_ca_system_score_codex":0.0012277302,"about_ca_system_score_gemma":0.002026446,"threshold_uncertainty_score":0.037323833},"labels":[],"label_agreement":null},{"id":"W2905893137","doi":"","title":"A conceptual framework for tracking design completeness of Track Line discipline in MRT projects","year":2018,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Completeness (order theory); Tracking (education); Computer science; Track (disk drive); Conceptual framework; Sociology; Mathematics; Epistemology; Philosophy","score_opus":0.07465494436732617,"score_gpt":0.2961617520021516,"score_spread":0.22150680763482544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2905893137","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055511435,0.0001496609,0.98699147,0.0004646251,0.00003102775,0.00015572085,0.00020050233,0.0005422611,0.0059136376],"genre_scores_gemma":[0.1569488,0.00022686285,0.8400334,0.00010871418,0.000035201047,0.00031776802,0.0005798562,0.00013765243,0.0016117913],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.985887,0.0046429266,0.0019958632,0.0028324032,0.0035746063,0.0010672495],"domain_scores_gemma":[0.9713208,0.007644536,0.0042512966,0.0061713704,0.009296531,0.0013154249],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019442433,0.001171086,0.00092723564,0.010784628,0.0029769554,0.013401396,0.0053559016,0.0028680244,0.0061830077],"category_scores_gemma":[0.03701047,0.0014418084,0.0025477938,0.007875399,0.008988821,0.017379735,0.006602423,0.0035774456,0.0013080394],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038280854,0.00007434332,0.0030112262,0.00021893122,0.000048652426,0.00014834198,0.0029349271,0.019066997,0.0009045796,0.91963,0.0015469063,0.052376907],"study_design_scores_gemma":[0.000059384412,0.00027328308,0.003707749,0.0011041929,0.00022570185,0.00056922657,0.006693977,0.2621574,0.0050740438,0.64316386,0.076805346,0.00016586976],"about_ca_topic_score_codex":0.025200214,"about_ca_topic_score_gemma":0.020118214,"teacher_disagreement_score":0.025200214,"about_ca_system_score_codex":0.0047333874,"about_ca_system_score_gemma":0.008135572,"threshold_uncertainty_score":0.10282266},"labels":[],"label_agreement":null},{"id":"W2909176525","doi":"","title":"RESILIENCE-BASED BLAST DESIGN OF REINFORCED CONCRETE MASONRY SYSTEMS","year":2018,"lang":"en","type":"dissertation","venue":"MacSphere (McMaster University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"U.S. Department of Homeland Security; Federal Emergency Management Agency; Graduate School, University of Maryland; Canada Masonry Design Centre; Natural Sciences and Engineering Research Council of Canada; McMaster University","keywords":"Resilience (materials science); Masonry; Unreinforced masonry building; Engineering; Structural engineering; Forensic engineering; Geotechnical engineering; Civil engineering; Materials science; Composite material","score_opus":0.009681655805914546,"score_gpt":0.18020822207963072,"score_spread":0.17052656627371618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909176525","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25281364,0.00047932754,0.7192716,0.00029640127,0.000050287763,0.00015374631,0.00015692244,0.00028982107,0.026488246],"genre_scores_gemma":[0.977698,0.00019438188,0.017511413,0.000019225683,0.000007362486,0.000060614886,0.000042845375,0.000032890686,0.004433249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981076,0.000053404754,0.0000074960763,0.000027296779,0.000066730165,0.000034306206],"domain_scores_gemma":[0.99982625,0.00004608422,0.000042446554,0.00001192854,0.00004796788,0.00002538165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038681825,0.0005429946,0.00037893417,0.00057294784,0.00026401423,0.0007279921,0.00059490843,0.0006302927,0.0027056218],"category_scores_gemma":[0.000603192,0.00032177015,0.00042492757,0.0002016255,0.00066127564,0.00040263796,0.0008868508,0.00039622185,0.00035413355],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037494152,0.000008950837,0.00039664537,0.000035835357,0.0000073505366,0.000079436,0.00003853757,0.97711515,0.0065445113,0.010023913,0.0001526946,0.0055594486],"study_design_scores_gemma":[0.0000041367102,0.000050518345,0.00021289453,0.000009263375,0.000004946303,0.000021385022,0.00003073018,0.9955271,0.0009638406,0.002420544,0.0007506062,0.0000040267346],"about_ca_topic_score_codex":0.0026742914,"about_ca_topic_score_gemma":0.0021528024,"teacher_disagreement_score":0.0027056218,"about_ca_system_score_codex":0.0007614739,"about_ca_system_score_gemma":0.0006404335,"threshold_uncertainty_score":0.009051263},"labels":[],"label_agreement":null},{"id":"W2909687747","doi":"10.18280/mmep.050408","title":"Energy savings in transportation: Setting up an innovative SHM method","year":2018,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Transport engineering; Computer science; Engineering; Mathematics","score_opus":0.015989762700554237,"score_gpt":0.22495417581633861,"score_spread":0.20896441311578437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909687747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023671407,0.00022925144,0.9719606,0.00017199312,0.000032209657,0.000055017405,0.000022293709,0.00016490724,0.003692331],"genre_scores_gemma":[0.3898747,0.00040457494,0.6053986,0.00006566426,0.000039701637,0.00015964734,0.000055120578,0.000057390833,0.0039445646],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965906,0.000097708864,0.000012400793,0.000061004623,0.0001523266,0.00001757875],"domain_scores_gemma":[0.99987197,0.000049698316,0.000016335509,0.000026484315,0.0000293342,0.0000061862024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003998848,0.00040141866,0.00033036558,0.00047431298,0.00023289591,0.00047054444,0.0005405433,0.0004747244,0.0017346893],"category_scores_gemma":[0.0004345054,0.00020934905,0.00034858446,0.00035926607,0.0004401021,0.0009694702,0.00078537024,0.00038932485,0.00034352264],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013142927,0.00028167694,0.0020263842,0.00042919218,0.00005344017,0.00011160185,0.00023034704,0.18997037,0.21214566,0.03953216,0.0014083458,0.5536793],"study_design_scores_gemma":[0.00002726662,0.000326826,0.0014492937,0.000030249807,0.000032120974,0.00011926971,0.00013840136,0.9063834,0.06371353,0.013836843,0.013912782,0.000030067256],"about_ca_topic_score_codex":0.00046802373,"about_ca_topic_score_gemma":0.0007389336,"teacher_disagreement_score":0.0017346893,"about_ca_system_score_codex":0.000344441,"about_ca_system_score_gemma":0.0003540502,"threshold_uncertainty_score":0.005803168},"labels":[],"label_agreement":null},{"id":"W2909948712","doi":"10.3390/app9020310","title":"Data Sensing and Processing Tensioning System Based on the Internet of Things","year":2019,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Petroleum Technology Research Centre; Guizhou Science and Technology Department; National Natural Science Foundation of China","keywords":"Precast concrete; Data acquisition; Computer science; Application layer; Real-time computing; Android (operating system); Process (computing); Data processing; Engineering; Database; Structural engineering; Operating system; Software","score_opus":0.018580586424551307,"score_gpt":0.20849206592769645,"score_spread":0.18991147950314513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2909948712","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074244976,0.0009135857,0.89382726,0.00060742744,0.00049091363,0.0005509469,0.0006836264,0.010211073,0.018470174],"genre_scores_gemma":[0.83276033,0.0010173182,0.15507351,0.000640541,0.00018704147,0.0005594111,0.0018068315,0.00019922806,0.0077557415],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992466,0.000082653016,0.00008440136,0.00015982537,0.0003426016,0.00008390107],"domain_scores_gemma":[0.9996675,0.00005631796,0.000037853963,0.00007149643,0.00013789936,0.000028894225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055329705,0.0006648854,0.00056937203,0.001041569,0.0005509623,0.0008460927,0.0009319214,0.00062255264,0.0013863649],"category_scores_gemma":[0.0007225991,0.00026377017,0.00054829917,0.0008376385,0.00028999188,0.0014993058,0.0010506916,0.00052587973,0.00044530607],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001027044,0.00057493994,0.019257084,0.0013546682,0.0004008713,0.0025043741,0.001225338,0.025275815,0.30784595,0.027844299,0.024087504,0.5886022],"study_design_scores_gemma":[0.00024844243,0.0013153777,0.03137678,0.00024342623,0.00056856184,0.003684873,0.0011270598,0.59665555,0.25043544,0.024461927,0.08946952,0.00041296985],"about_ca_topic_score_codex":0.0011725499,"about_ca_topic_score_gemma":0.0010487165,"teacher_disagreement_score":0.0013863649,"about_ca_system_score_codex":0.00027151653,"about_ca_system_score_gemma":0.00050385663,"threshold_uncertainty_score":0.004637897},"labels":[],"label_agreement":null},{"id":"W2911311605","doi":"10.1016/j.autcon.2019.01.010","title":"Building information modelling for off-site construction: Review and future directions","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":410,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Data science; Computer science; Scopus; Prefabrication; Engineering; Civil engineering","score_opus":0.005405755476567432,"score_gpt":0.2094625117056206,"score_spread":0.20405675622905317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2911311605","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008572819,0.97358364,0.020321868,0.0011074991,0.00031912798,0.000022403075,0.00012975103,0.00013324947,0.003525092],"genre_scores_gemma":[0.00839352,0.9760878,0.013891498,0.00026620633,0.00035841198,0.000022006681,0.00027383695,0.00003359576,0.00067303365],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99855715,0.0004160761,0.00015630302,0.000248608,0.00055601,0.00006579307],"domain_scores_gemma":[0.9933514,0.004724562,0.0003659807,0.00039966978,0.0010477592,0.00011059894],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034843,0.001595707,0.0032558166,0.0039521586,0.0003243372,0.0036842981,0.0045131226,0.0024781665,0.003640126],"category_scores_gemma":[0.005796632,0.00092772656,0.0015351387,0.007139662,0.0016049157,0.0056124628,0.001560508,0.001736597,0.0020853619],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039263326,0.00009305455,0.0008424166,0.01946978,0.00015886172,0.000086730346,0.00017090738,0.011383438,0.0006400095,0.02569725,0.011483764,0.9299345],"study_design_scores_gemma":[0.000023006723,0.000115708404,0.002064864,0.01973912,0.00054203183,0.0010956686,0.00051760935,0.02798498,0.0020272522,0.04945749,0.89624953,0.00018271997],"about_ca_topic_score_codex":0.005149693,"about_ca_topic_score_gemma":0.0044618114,"teacher_disagreement_score":0.005149693,"about_ca_system_score_codex":0.0013679503,"about_ca_system_score_gemma":0.0030205445,"threshold_uncertainty_score":0.018426955},"labels":[],"label_agreement":null},{"id":"W2912791728","doi":"","title":"Proceedings of the 10th international conference on Mathematics of program construction","year":2010,"lang":"en","type":"article","venue":"Mathematics of Program Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Computer science; Mathematics education; Software engineering; Engineering; Mathematics","score_opus":0.015977880914499677,"score_gpt":0.2525470684546176,"score_spread":0.23656918754011794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2912791728","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019862939,0.07400798,0.37870136,0.023935502,0.066871434,0.0001308618,0.0011262767,0.00078259094,0.4345811],"genre_scores_gemma":[0.23279321,0.050132763,0.23744589,0.002756913,0.025844907,0.0003643106,0.00395601,0.0014145363,0.44529155],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99854064,0.00043376232,0.00011099397,0.00035774833,0.00043721814,0.00011975117],"domain_scores_gemma":[0.99818146,0.00052571093,0.000069510184,0.0003677001,0.000621954,0.0002336776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026798742,0.001083996,0.0018875513,0.0017258183,0.0013076949,0.007244311,0.001418695,0.0012006635,0.035799],"category_scores_gemma":[0.0036727462,0.00062679726,0.0016924146,0.0015557684,0.00230183,0.004266595,0.0024727255,0.005379769,0.005982164],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022570389,0.00017636489,0.0010386201,0.0003411497,0.0001263257,0.00012892023,0.00047299007,0.0036290511,0.0016024268,0.6664095,0.17164199,0.15420695],"study_design_scores_gemma":[0.000048538182,0.000076407254,0.0020052388,0.0002905643,0.00010006802,0.00035144622,0.00023296573,0.018170144,0.0014856262,0.3163189,0.6608709,0.000049251987],"about_ca_topic_score_codex":0.004095203,"about_ca_topic_score_gemma":0.0054655075,"teacher_disagreement_score":0.035799,"about_ca_system_score_codex":0.0040731886,"about_ca_system_score_gemma":0.0023837404,"threshold_uncertainty_score":0.11975956},"labels":[],"label_agreement":null},{"id":"W2913423770","doi":"10.1139/cjce-2018-0349","title":"Framework for developing labour-hour prediction models from project design features: case study in structural steel fabrication","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Computer science; Regression analysis; Range (aeronautics); Linear regression; Work (physics); Predictive modelling; Industrial engineering; Point (geometry); Regression; Data mining; Operations research; Engineering; Machine learning; Mathematics; Statistics; Mechanical engineering","score_opus":0.021644773565291445,"score_gpt":0.2281888556729337,"score_spread":0.20654408210764225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2913423770","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008741406,0.00012135446,0.9880023,0.00026854122,0.0000147993605,0.00013342437,0.00045092695,0.00043000554,0.0018372036],"genre_scores_gemma":[0.30529454,0.0004269585,0.6894055,0.000077054676,0.00004251064,0.00094189617,0.0016578804,0.00012652225,0.0020271922],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837327,0.0008247858,0.00009303891,0.00031212627,0.00028965104,0.00010701504],"domain_scores_gemma":[0.9973036,0.0017555411,0.0002994872,0.00013646246,0.0004406772,0.00006412411],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004269061,0.0012429536,0.0007331511,0.0027192107,0.00050104986,0.0017488834,0.0022670664,0.0010340603,0.0025059388],"category_scores_gemma":[0.007837781,0.0006457,0.0013015276,0.002366402,0.00063239026,0.0014057176,0.0013862184,0.001083867,0.00076369493],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050093964,0.00019903107,0.0060873893,0.00020839387,0.00009426863,0.00018142581,0.00038781317,0.8507257,0.00082706654,0.052824304,0.0020557325,0.08635883],"study_design_scores_gemma":[0.000008482064,0.000033732616,0.0011809968,0.000040869752,0.000018436942,0.000038198406,0.000113196926,0.97999305,0.00031145057,0.01612827,0.0021103446,0.000022948583],"about_ca_topic_score_codex":0.02464022,"about_ca_topic_score_gemma":0.02782169,"teacher_disagreement_score":0.02464022,"about_ca_system_score_codex":0.0019159629,"about_ca_system_score_gemma":0.002789556,"threshold_uncertainty_score":0.048993647},"labels":[],"label_agreement":null},{"id":"W2914120926","doi":"10.29173/mocs57","title":"Modelling and analysis of two production solutions for precast concrete elements: a petri-nets approach","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Production (economics); Upgrade; Automation; Productivity; Computer science; Factory (object-oriented programming); Lead time; Operations research; Industrial engineering; Risk analysis (engineering); Engineering; Civil engineering; Operations management; Business; Mechanical engineering","score_opus":0.025329505509203997,"score_gpt":0.23162227908016897,"score_spread":0.20629277357096498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914120926","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.040804714,0.00027306587,0.94877476,0.0001338377,0.000040501316,0.00012736548,0.00015309984,0.0002112659,0.0094813695],"genre_scores_gemma":[0.7601746,0.00085342093,0.22542791,0.000039829967,0.000018887495,0.00042428347,0.0003559933,0.00008569274,0.01261944],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99951684,0.00012447647,0.000031859214,0.00008823968,0.00015377962,0.000084780884],"domain_scores_gemma":[0.99949217,0.00028241225,0.00008433897,0.000019925925,0.00009024896,0.00003096955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007755964,0.0010029371,0.00054484024,0.0011330006,0.0007199154,0.0017815526,0.0012752995,0.0013171466,0.003267457],"category_scores_gemma":[0.0011381209,0.00071199634,0.0016336808,0.0007552339,0.00093810126,0.0010089364,0.00081431697,0.00087699183,0.00038438293],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017389313,0.00001563161,0.00032811478,0.000040526487,0.000010088291,0.000096691954,0.000050513092,0.984444,0.0014728971,0.01055549,0.000059632082,0.0029091295],"study_design_scores_gemma":[0.000004494858,0.00001824798,0.00011573625,0.000013453818,0.000011139893,0.000021214064,0.000028398763,0.99344504,0.000932466,0.004553802,0.0008488738,0.000007197561],"about_ca_topic_score_codex":0.021058457,"about_ca_topic_score_gemma":0.017099256,"teacher_disagreement_score":0.021058457,"about_ca_system_score_codex":0.0018899956,"about_ca_system_score_gemma":0.0027204535,"threshold_uncertainty_score":0.041871786},"labels":[],"label_agreement":null},{"id":"W2914157240","doi":"","title":"Proceedings of the Symposium on Simulation for Architecture & Urban Design","year":2013,"lang":"en","type":"article","venue":"Spring Simulation Multiconference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Privilege (computing); Presentation (obstetrics); Honor; Architecture; Computer science; Panel discussion; Work (physics); Operations research; Library science; Engineering ethics; Engineering; History; Medicine; Computer security; Internet privacy","score_opus":0.01876415900115818,"score_gpt":0.2278807952504878,"score_spread":0.2091166362493296,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2914157240","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008335963,0.05405894,0.5467589,0.014926632,0.042255282,0.00023040599,0.0024617007,0.005196007,0.32577628],"genre_scores_gemma":[0.1400435,0.062314384,0.27625492,0.001990822,0.0075295484,0.00057019864,0.00927146,0.004725664,0.49729943],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989531,0.00034550755,0.00008710247,0.00012227877,0.00042747142,0.00006446466],"domain_scores_gemma":[0.99839467,0.00040813294,0.000042203137,0.0003698048,0.00058030017,0.00020474436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002106505,0.0011246395,0.0011293547,0.0010110221,0.00065374176,0.0037325073,0.0010960798,0.0011975544,0.066911116],"category_scores_gemma":[0.0037781242,0.00058175944,0.0014069786,0.00087396416,0.0007062582,0.0018120368,0.0020705084,0.0023733275,0.020235425],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022390405,0.00010606336,0.0012379698,0.00044915066,0.0001739133,0.00015220502,0.0003353851,0.027375827,0.0044850605,0.1018119,0.5316155,0.33203304],"study_design_scores_gemma":[0.000014270661,0.000036088783,0.00045420413,0.00016665814,0.000032348016,0.00010988706,0.000068171306,0.018632628,0.00076790503,0.017360475,0.96234024,0.000017168551],"about_ca_topic_score_codex":0.0035052137,"about_ca_topic_score_gemma":0.0047802944,"teacher_disagreement_score":0.066911116,"about_ca_system_score_codex":0.0009272233,"about_ca_system_score_gemma":0.002145009,"threshold_uncertainty_score":0.22384},"labels":[],"label_agreement":null},{"id":"W2915459067","doi":"","title":"Transportation Research and Analysis Computing Center (TRACC) Year 6 Quarter 4 Progress Report","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Center (category theory); Computer science; Transport engineering; Engineering; Geography; Archaeology","score_opus":0.016284628334663317,"score_gpt":0.2728734423810821,"score_spread":0.25658881404641876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2915459067","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021213176,0.0028414333,0.09552117,0.015135281,0.019955996,0.0030706592,0.15828437,0.039110847,0.64486706],"genre_scores_gemma":[0.03454473,0.00404423,0.06310476,0.0005902446,0.0010961322,0.0011681718,0.20762342,0.0046805856,0.6831477],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9941269,0.0005218094,0.00014704549,0.00042250485,0.004160613,0.0006211041],"domain_scores_gemma":[0.97925067,0.0011102728,0.0002857171,0.0023186707,0.015513674,0.0015209072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008522755,0.001884843,0.0017542879,0.004596409,0.0021381034,0.007330505,0.002847917,0.0015156039,0.17440216],"category_scores_gemma":[0.008324103,0.0010418296,0.0013126645,0.0046465695,0.00058938464,0.0036225785,0.003222558,0.0024267258,0.14569925],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019438643,0.0003590377,0.0013809779,0.000090938425,0.000025770014,0.00002137585,0.000032491153,0.0019982753,0.0008510904,0.0023882661,0.9067985,0.08585883],"study_design_scores_gemma":[0.000082877625,0.0002575722,0.0044665593,0.00012034232,0.000070670554,0.000027977296,0.00020465533,0.01497179,0.0071291267,0.0022241138,0.97039706,0.0000473254],"about_ca_topic_score_codex":0.09744485,"about_ca_topic_score_gemma":0.08525289,"teacher_disagreement_score":0.17440216,"about_ca_system_score_codex":0.0030782132,"about_ca_system_score_gemma":0.015907638,"threshold_uncertainty_score":0.5834334},"labels":[],"label_agreement":null},{"id":"W2918609961","doi":"10.1139/cjce-2018-0020","title":"A framework for total productivity measurement of industrial construction projects","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs","keywords":"Productivity; Project management; Construction industry; Construction management; Metric (unit); Earned value management; Session (web analytics); Project management triangle; Engineering; Engineering management; Computer science; Operations management; Process management; Systems engineering; Construction engineering; OPM3; Civil engineering; Economics","score_opus":0.02229212532759527,"score_gpt":0.1917701409583028,"score_spread":0.16947801563070752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918609961","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012414194,0.0018880542,0.9559872,0.0015395968,0.00018834314,0.0021233156,0.0023493338,0.00084305764,0.022666927],"genre_scores_gemma":[0.0781596,0.00097577134,0.91273236,0.00015891227,0.000057031106,0.00462022,0.0018708019,0.00013107144,0.0012942199],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9632378,0.017520027,0.0054481346,0.0033343474,0.009277494,0.0011821474],"domain_scores_gemma":[0.9674019,0.015525035,0.0045715566,0.0025820504,0.009073951,0.0008455413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.028075822,0.0025309632,0.0013384612,0.021340637,0.0023602422,0.008123291,0.0033881054,0.0020814845,0.0032714086],"category_scores_gemma":[0.042604323,0.0009293154,0.0026221967,0.019846499,0.0040496406,0.008526624,0.0051152213,0.0027916355,0.0011629874],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082092534,0.0004717537,0.018364403,0.002339086,0.00018466698,0.0003234837,0.017195249,0.020126784,0.0032191772,0.6102404,0.018018188,0.30943477],"study_design_scores_gemma":[0.00009579113,0.0008135129,0.049687825,0.0048771687,0.0001896337,0.000981238,0.020346863,0.06623952,0.0032978535,0.51680577,0.33620346,0.0004613741],"about_ca_topic_score_codex":0.016689649,"about_ca_topic_score_gemma":0.011671451,"teacher_disagreement_score":0.028075822,"about_ca_system_score_codex":0.008750681,"about_ca_system_score_gemma":0.011927108,"threshold_uncertainty_score":0.14848095},"labels":[],"label_agreement":null},{"id":"W2918813191","doi":"","title":"Framework for Scheduling, Controlling, and Delivery Planning for Scattered Repetitive Infrastructure Rehabilitation Projects","year":2019,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rehabilitation; Scheduling (production processes); Infrastructure planning; Computer science; Process management; Engineering; Engineering management; Operations management; Systems engineering; Medicine; Construction engineering; Physical therapy","score_opus":0.007979555117976225,"score_gpt":0.21001979232751775,"score_spread":0.2020402372095415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2918813191","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00386699,0.0001761637,0.9897792,0.0002127515,0.000039022674,0.0002000053,0.00018909611,0.00027960565,0.005257138],"genre_scores_gemma":[0.33651018,0.001170582,0.65154606,0.000119954486,0.00010477924,0.0014734871,0.0007570267,0.00023134847,0.008086569],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990239,0.00026208704,0.000045250104,0.00018481322,0.00029791452,0.00018597378],"domain_scores_gemma":[0.99926883,0.00031247595,0.000120228506,0.000032253327,0.00018862018,0.000077643126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022042633,0.0015430298,0.001236644,0.0012112407,0.0009485648,0.0019425055,0.0024085152,0.0012539608,0.0055245105],"category_scores_gemma":[0.0022433097,0.00087848265,0.001343703,0.0012387583,0.00085347827,0.001098416,0.0015148412,0.0016856503,0.00081360183],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015299043,0.000025555459,0.00014475214,0.000046161724,0.000009052134,0.000038757615,0.000039477214,0.97769326,0.00032074386,0.013496759,0.00069754495,0.0074726073],"study_design_scores_gemma":[0.000010862981,0.000024706787,0.000057102476,0.000009828927,0.000005848102,0.000007137936,0.000022907536,0.99457055,0.00011464456,0.0037415023,0.0014294515,0.0000055049436],"about_ca_topic_score_codex":0.041547824,"about_ca_topic_score_gemma":0.03336768,"teacher_disagreement_score":0.041547824,"about_ca_system_score_codex":0.0032220217,"about_ca_system_score_gemma":0.006502939,"threshold_uncertainty_score":0.08261198},"labels":[],"label_agreement":null},{"id":"W2919200533","doi":"10.7202/1056303ar","title":"Comprendre l’impact du numérique sur la gestion de projet en construction","year":2019,"lang":"fr","type":"article","venue":"Lien social et Politiques","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.00902906843565926,"score_gpt":0.26627580519415134,"score_spread":0.2572467367584921,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2919200533","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20293775,0.005589872,0.51103663,0.0057279463,0.00065228035,0.00019052392,0.00044657328,0.0010949287,0.27232355],"genre_scores_gemma":[0.77155185,0.0030782102,0.19496131,0.00029270182,0.00009453502,0.00026038382,0.00034569908,0.00055082527,0.028864458],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99076533,0.0034324883,0.00041583643,0.0010402919,0.003983946,0.00036205482],"domain_scores_gemma":[0.9809476,0.012312219,0.001285342,0.0017343317,0.0031668148,0.00055364624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068778214,0.0010318392,0.0008147493,0.0021915608,0.0018111418,0.010091335,0.0014775251,0.001688642,0.018893246],"category_scores_gemma":[0.026712252,0.0007264616,0.000961631,0.002313248,0.0034459368,0.0060326383,0.004857424,0.001751954,0.0025274663],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005696376,0.00027077287,0.02557593,0.0023445722,0.00017279746,0.0005073434,0.010951104,0.08670446,0.014721083,0.41807464,0.004980574,0.43512705],"study_design_scores_gemma":[0.00017689234,0.0011302808,0.07843123,0.0034600843,0.0004028484,0.001265482,0.018117394,0.15620998,0.025989836,0.35445526,0.35989073,0.00047000026],"about_ca_topic_score_codex":0.01191537,"about_ca_topic_score_gemma":0.0140597075,"teacher_disagreement_score":0.018893246,"about_ca_system_score_codex":0.0040993257,"about_ca_system_score_gemma":0.0048000896,"threshold_uncertainty_score":0.06320417},"labels":[],"label_agreement":null},{"id":"W2920370767","doi":"10.1007/978-3-030-10510-5_13","title":"Achieving Quality in Concrete Construction","year":2019,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"IBI Group (Canada)","funders":"","keywords":"Quality assurance; Quality (philosophy); Quality control; Control (management); Construction engineering; Engineering; Plan (archaeology); Civil engineering; Reliability engineering; Risk analysis (engineering); Computer science; Operations management; Business","score_opus":0.014649543088671585,"score_gpt":0.22068574936695648,"score_spread":0.2060362062782849,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2920370767","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015203066,0.011077646,0.039932523,0.0021345972,0.00038453433,0.000025511661,0.000030787265,0.00011610285,0.94477797],"genre_scores_gemma":[0.06702816,0.01784847,0.030998943,0.00066627725,0.00024808542,0.00006667209,0.00013788926,0.00027667065,0.8827288],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99927324,0.0001370803,0.000019173402,0.00005490535,0.00045355142,0.00006208558],"domain_scores_gemma":[0.99985397,0.000046426845,0.000009560066,0.000026109723,0.000051270632,0.00001270815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006052156,0.0007563291,0.0003492246,0.0008333518,0.001226775,0.004103533,0.0007745853,0.0011973634,0.018156582],"category_scores_gemma":[0.0009466513,0.00036189318,0.00025882266,0.0015060209,0.0031399508,0.0034557793,0.0028003424,0.0020121674,0.00454199],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000046602104,0.00001656729,0.000054200445,0.000110677676,0.0000026446935,0.000023306655,0.0007571078,0.0015870712,0.00036577016,0.8478002,0.033943307,0.11533447],"study_design_scores_gemma":[0.0000024913697,0.000012067641,0.00029078522,0.00025003336,0.0000039581687,0.00009309596,0.00053694326,0.001357332,0.00070210453,0.29937485,0.6973684,0.000007872743],"about_ca_topic_score_codex":0.005307843,"about_ca_topic_score_gemma":0.011594017,"teacher_disagreement_score":0.018156582,"about_ca_system_score_codex":0.0028251077,"about_ca_system_score_gemma":0.0016605351,"threshold_uncertainty_score":0.060739815},"labels":[],"label_agreement":null},{"id":"W2921270821","doi":"10.1139/cjce-2018-0462","title":"Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Context (archaeology); Prefabrication; Build to order; Engineering; Lean construction; Production (economics); Order (exchange); Construction engineering; Set (abstract data type); Quality (philosophy); Systems engineering; Manufacturing engineering; Architectural engineering; Computer science; Civil engineering; Construction industry; Operations management; Business","score_opus":0.02174191597938278,"score_gpt":0.19712275131129162,"score_spread":0.17538083533190885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921270821","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04046401,0.00022557292,0.93351054,0.0008339456,0.00004682275,0.00023434564,0.00042729115,0.0003908125,0.02386658],"genre_scores_gemma":[0.72410953,0.000694917,0.260495,0.000096177515,0.000021089952,0.00093593204,0.000535772,0.00008154015,0.013030092],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999551,0.00012767769,0.000024738825,0.00009849273,0.0001312392,0.0000667982],"domain_scores_gemma":[0.99936205,0.0003698884,0.00009120665,0.000033213673,0.000104146864,0.00003952189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010920407,0.0009272772,0.00060597813,0.0007984978,0.00084969937,0.00231214,0.0019548687,0.0015742877,0.0056397477],"category_scores_gemma":[0.001234886,0.0005585331,0.0010028583,0.00088591164,0.0012016847,0.001390493,0.0011894879,0.0012856422,0.0005824144],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025940311,0.00005198654,0.00037005523,0.000044471024,0.0000113037395,0.00006165382,0.00010144195,0.961777,0.0006170414,0.03183025,0.00025084434,0.0048581],"study_design_scores_gemma":[0.00001900049,0.000028556102,0.00014029437,0.000010599254,0.000012734058,0.000010545967,0.000047635487,0.9913652,0.00029684036,0.0066870763,0.0013737925,0.000007671593],"about_ca_topic_score_codex":0.03353392,"about_ca_topic_score_gemma":0.027420029,"teacher_disagreement_score":0.03353392,"about_ca_system_score_codex":0.0027214459,"about_ca_system_score_gemma":0.0041817734,"threshold_uncertainty_score":0.06667751},"labels":[],"label_agreement":null},{"id":"W2921337194","doi":"","title":"Gérer en mode gestion de projet : Microsoft Office Project 2010","year":2011,"lang":"fr","type":"book","venue":"Loze-Dion éditeur eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.01823271612243796,"score_gpt":0.2272560052414302,"score_spread":0.20902328911899223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921337194","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21668664,0.009481168,0.14801984,0.02277331,0.0029199389,0.0039488766,0.014526358,0.0456707,0.5359733],"genre_scores_gemma":[0.24916048,0.005408982,0.20663309,0.0011717499,0.00037021516,0.0015553143,0.029921954,0.00808164,0.49769658],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.993947,0.0011680842,0.0004757464,0.0008485814,0.0029394971,0.0006210918],"domain_scores_gemma":[0.99156404,0.0009955274,0.0005041776,0.0010834183,0.0037765456,0.0020763646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008953575,0.0008231508,0.00043576243,0.0025934402,0.001913896,0.0067778514,0.0011182352,0.0015122779,0.019133676],"category_scores_gemma":[0.012025029,0.00063508685,0.0003756115,0.0026359342,0.00067959836,0.003916739,0.0022374527,0.0012808728,0.01269243],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005938911,0.0004922234,0.0049520154,0.00035427551,0.000027184546,0.00040349006,0.005285077,0.0011085701,0.00667554,0.021093477,0.26441917,0.6945951],"study_design_scores_gemma":[0.00016821835,0.00033745772,0.010995,0.0003174639,0.00002671758,0.00041673347,0.0023562235,0.0020846154,0.0060040043,0.0037202025,0.97347486,0.00009849046],"about_ca_topic_score_codex":0.05438697,"about_ca_topic_score_gemma":0.07047563,"teacher_disagreement_score":0.05438697,"about_ca_system_score_codex":0.004908148,"about_ca_system_score_gemma":0.010760964,"threshold_uncertainty_score":0.108140826},"labels":[],"label_agreement":null},{"id":"W2921875200","doi":"","title":"Quelle place pour la planification et l'improvisation en gestion de projet? : une exploration à partir de projets en arts visuels","year":2018,"lang":"fr","type":"article","venue":"Archipelago (University of Quebec in Montreal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Art; Political science","score_opus":0.012755556333840264,"score_gpt":0.22083763540932755,"score_spread":0.2080820790754873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2921875200","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2651974,0.005642295,0.29974025,0.025848545,0.0007207182,0.00047359255,0.0001942749,0.000715158,0.40146777],"genre_scores_gemma":[0.881381,0.0026617353,0.051456917,0.0007431766,0.00007587818,0.00036684438,0.00010934776,0.00030729666,0.0628978],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9936494,0.0037492367,0.00015899107,0.0006047056,0.0011758219,0.0006617815],"domain_scores_gemma":[0.99452436,0.003189846,0.00039467058,0.0005454568,0.00057169003,0.0007740293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005516115,0.0006759089,0.00041544682,0.001246752,0.006317411,0.0148842605,0.001887935,0.0028140668,0.014480603],"category_scores_gemma":[0.007558897,0.00064056175,0.0009207408,0.0021298858,0.014505352,0.011839607,0.007890864,0.004295901,0.0021123015],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001565476,0.00015173013,0.003084833,0.0006994605,0.000020688507,0.0009606834,0.38877985,0.0021453884,0.0036492427,0.49188825,0.0039956546,0.10446769],"study_design_scores_gemma":[0.00005146796,0.00027519497,0.0072304215,0.0016424706,0.000033747496,0.0009612772,0.4447632,0.0035752126,0.0033754737,0.12958395,0.40840104,0.00010652751],"about_ca_topic_score_codex":0.008447975,"about_ca_topic_score_gemma":0.011193638,"teacher_disagreement_score":0.0148842605,"about_ca_system_score_codex":0.0047014793,"about_ca_system_score_gemma":0.010305031,"threshold_uncertainty_score":0.048442423},"labels":[],"label_agreement":null},{"id":"W2922438643","doi":"10.1139/cjce-2018-0149","title":"Optimized material management in construction using multi-layer perceptron","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Unavailability; Genetic algorithm; Computer science; Schedule; Perceptron; Component (thermodynamics); Multilayer perceptron; Mathematical optimization; Total cost; Artificial neural network; Reliability engineering; Engineering; Machine learning","score_opus":0.009365840395599269,"score_gpt":0.18982156391672678,"score_spread":0.18045572352112751,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2922438643","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13163155,0.00067391765,0.8603037,0.00031335762,0.00011504671,0.00007724651,0.00013416003,0.0012381538,0.0055128597],"genre_scores_gemma":[0.90196,0.00017318116,0.09508258,0.0000965873,0.000020935613,0.00008422293,0.00014878207,0.000050430226,0.0023832163],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966073,0.00008875924,0.000022240718,0.00007856834,0.00007767772,0.00007192982],"domain_scores_gemma":[0.9996037,0.00022266731,0.00005231425,0.000020422689,0.000078383644,0.000022482469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087181834,0.0008610742,0.00087518495,0.0005598507,0.0004340908,0.0010126155,0.0008965915,0.0012484328,0.001741219],"category_scores_gemma":[0.001006554,0.00060034497,0.0007774382,0.0006924598,0.0004907369,0.000808469,0.00046746887,0.00087495736,0.0002747686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003627998,0.000028136215,0.00028030574,0.000023741564,0.000012586103,0.000024978588,0.0000074108516,0.98510855,0.00088878843,0.00033368132,0.00019080039,0.013064737],"study_design_scores_gemma":[0.0000029097685,0.000010605859,0.00007313911,0.000001270408,0.0000024039186,0.0000022389384,0.000001857546,0.9994332,0.00022543609,0.00019977844,0.000045542703,0.0000016436727],"about_ca_topic_score_codex":0.011208504,"about_ca_topic_score_gemma":0.011221475,"teacher_disagreement_score":0.011208504,"about_ca_system_score_codex":0.001108597,"about_ca_system_score_gemma":0.0013349055,"threshold_uncertainty_score":0.022286534},"labels":[],"label_agreement":null},{"id":"W2923839026","doi":"10.1139/cjce-2018-0408","title":"Lean construction and BIM in small and medium-sized enterprises (SMEs) in construction: a systematic literature review","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Lean construction; Business; Construction industry; Building information modeling; Small and medium-sized enterprises; Systematic review; Process management; Knowledge management; Operations management; Construction engineering; Computer science; Engineering","score_opus":0.0037709008377199258,"score_gpt":0.1653101364662113,"score_spread":0.16153923562849137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2923839026","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055135675,0.9919219,0.00045642065,0.0005416091,0.000085382846,0.0001928475,0.00024620685,0.0000060635502,0.0010360013],"genre_scores_gemma":[0.02745978,0.9698193,0.0015594248,0.0004415758,0.00005788034,0.00030553885,0.00020260474,0.0000040842706,0.00014975539],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9933356,0.0023585823,0.00225622,0.0003814517,0.0014812128,0.00018679221],"domain_scores_gemma":[0.9628797,0.029295957,0.0035173122,0.00039015073,0.003547596,0.0003692015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0085890135,0.00072692067,0.0024207341,0.020350432,0.00095438067,0.0026725752,0.00091376225,0.0015522608,0.0023127308],"category_scores_gemma":[0.028840398,0.0006996981,0.0018135873,0.023440229,0.0011297265,0.0031266182,0.0015934494,0.00082043814,0.0002596623],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011482423,0.00008829861,0.0051315767,0.7060449,0.0011896398,0.00080551987,0.00359013,0.0003139199,0.0005696648,0.002219934,0.0033573494,0.27657413],"study_design_scores_gemma":[0.000041113028,0.00022747304,0.014660932,0.8605118,0.0062164282,0.0018387656,0.007249376,0.00018928557,0.00045691468,0.0011965944,0.10734863,0.00006279388],"about_ca_topic_score_codex":0.00873407,"about_ca_topic_score_gemma":0.030968154,"teacher_disagreement_score":0.020350432,"about_ca_system_score_codex":0.0027287365,"about_ca_system_score_gemma":0.01795584,"threshold_uncertainty_score":0.045423567},"labels":[],"label_agreement":null},{"id":"W2926743677","doi":"10.11159/icgre19.134","title":"Integrating BIM Models with 3D Scenery from UAV-Assisted Survey on Embankment","year":2019,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Levee; Computer science; Construction engineering; Systems engineering; Engineering; Geotechnical engineering","score_opus":0.006582562205163554,"score_gpt":0.1700372901665629,"score_spread":0.16345472796139934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2926743677","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5126359,0.0007413912,0.4594194,0.00047698955,0.0002607816,0.00025940978,0.0043700007,0.006832371,0.015003862],"genre_scores_gemma":[0.880278,0.0004941689,0.11290102,0.000087942695,0.000023852845,0.00007495456,0.0034516747,0.00043417932,0.0022542463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995548,0.000072604875,0.000021443302,0.00007917586,0.00019081538,0.00008118869],"domain_scores_gemma":[0.9996761,0.000044807468,0.000028493043,0.000086125685,0.00014210129,0.000022484248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039942266,0.0009004428,0.00065447454,0.002128435,0.00032823673,0.0013805664,0.000670617,0.00075926527,0.0036202148],"category_scores_gemma":[0.0009858354,0.0008121031,0.0009464939,0.0020466978,0.00029275895,0.0011809343,0.0012425256,0.0005040615,0.0018317918],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035791582,0.0005359969,0.023668008,0.0004030868,0.00025300647,0.00078936334,0.00070895493,0.49738,0.069421366,0.0026187242,0.008541983,0.3953216],"study_design_scores_gemma":[0.00002050538,0.00006467413,0.019740079,0.000059726928,0.00007193691,0.00016694948,0.0003378046,0.9610026,0.011874025,0.0010801563,0.0055225715,0.000058936756],"about_ca_topic_score_codex":0.010004527,"about_ca_topic_score_gemma":0.021940865,"teacher_disagreement_score":0.010004527,"about_ca_system_score_codex":0.00043719416,"about_ca_system_score_gemma":0.0009466111,"threshold_uncertainty_score":0.019892573},"labels":[],"label_agreement":null},{"id":"W2929470925","doi":"10.1108/ci-11-2018-0094","title":"BIM-based draft schedule generation in reinforced concrete-framed buildings","year":2019,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Schedule; Scope (computer science); Building information modeling; Computer science; Scheduling (production processes); Statement of work; Work breakdown structure; Architecture; Project management; Work (physics); Integrated project delivery; Originality; Construction management; Construction engineering; Software; Systems engineering; Software engineering; Project planning; Engineering; Civil engineering; Operations management","score_opus":0.009586889634625805,"score_gpt":0.20947308872613907,"score_spread":0.19988619909151326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2929470925","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05259174,0.00006057045,0.93444425,0.000053561726,0.000035243742,0.00030599296,0.00049359124,0.00643246,0.005582663],"genre_scores_gemma":[0.3170402,0.00012664459,0.6772104,0.000018933359,0.0000101373125,0.0002674354,0.0015492806,0.00048794932,0.0032890846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992969,0.00018895586,0.000048139485,0.00011731629,0.0003014773,0.000047130474],"domain_scores_gemma":[0.9990268,0.0002961859,0.00011520821,0.000176606,0.00032147212,0.0000638904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013523722,0.0006195496,0.000485388,0.0014197539,0.00045024607,0.0008624828,0.000836331,0.0003636537,0.0042023454],"category_scores_gemma":[0.0036271838,0.000517764,0.0006339227,0.0009089819,0.0003309437,0.0006959279,0.00073626323,0.00033462263,0.0014765412],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003424194,0.00020325491,0.0042576906,0.00022757098,0.00004047858,0.00038702568,0.0008325622,0.54767525,0.016729537,0.011425517,0.004691636,0.4131871],"study_design_scores_gemma":[0.000035164096,0.00007578023,0.0012709108,0.000021858095,0.000016823044,0.000058465626,0.00013251507,0.97450215,0.013935055,0.0028531167,0.0070733735,0.000024758974],"about_ca_topic_score_codex":0.0074034836,"about_ca_topic_score_gemma":0.0069301627,"teacher_disagreement_score":0.0074034836,"about_ca_system_score_codex":0.00072267314,"about_ca_system_score_gemma":0.0014262336,"threshold_uncertainty_score":0.014720798},"labels":[],"label_agreement":null},{"id":"W2930776121","doi":"10.11159/icsect19.134","title":"3D Model Generation of CFS Members from Surface Data","year":2019,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Computer science; Data modeling; Database","score_opus":0.011388869745481906,"score_gpt":0.1870707467830088,"score_spread":0.1756818770375269,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2930776121","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065787606,0.00011089664,0.9091505,0.00020617302,0.00011525225,0.000392181,0.00755847,0.012124347,0.0045545283],"genre_scores_gemma":[0.45506883,0.00031581565,0.5212147,0.00009630488,0.000030357909,0.0007896299,0.017550072,0.0012749305,0.003659255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955016,0.000032146923,0.00002529848,0.00007681391,0.00026935397,0.000046225046],"domain_scores_gemma":[0.9995783,0.00010130269,0.000030165378,0.0000914547,0.00017412067,0.000024668469],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036240052,0.0011742231,0.00080765865,0.0017335314,0.00038440694,0.0012700061,0.0012813666,0.0013458219,0.0052173804],"category_scores_gemma":[0.0012085198,0.00091021776,0.001545659,0.0016626345,0.0005189941,0.00069334934,0.0013734677,0.0009572164,0.0026114378],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021145862,0.00025781835,0.0055786893,0.0002895834,0.00007627175,0.00059379626,0.0004862794,0.72136045,0.051122967,0.005332844,0.013849063,0.20084086],"study_design_scores_gemma":[0.000014438419,0.00003589853,0.0009856895,0.000011666034,0.000009499346,0.0000843929,0.000108798165,0.98289376,0.00950308,0.0012616025,0.005061865,0.000029368683],"about_ca_topic_score_codex":0.007675384,"about_ca_topic_score_gemma":0.011681779,"teacher_disagreement_score":0.007675384,"about_ca_system_score_codex":0.00055437634,"about_ca_system_score_gemma":0.0016337305,"threshold_uncertainty_score":0.01745385},"labels":[],"label_agreement":null},{"id":"W29325392","doi":"10.7874/jao.2017.00192","title":"Software agents in bridge management","year":2005,"lang":"en","type":"article","venue":"Journal of Audiology & Otology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Acadia University","funders":"","keywords":"Bridge (graph theory); Software; Computer science; Business; Risk analysis (engineering); Programming language","score_opus":0.01429297126567346,"score_gpt":0.24891744199511737,"score_spread":0.2346244707294439,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W29325392","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22982083,0.011432738,0.516405,0.01471222,0.001029504,0.00024457532,0.00013096923,0.0013179085,0.22490624],"genre_scores_gemma":[0.86079824,0.0021195672,0.106878124,0.00032538982,0.00018526844,0.00011106956,0.00008756087,0.00011636117,0.029378435],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914706,0.00044661923,0.00007169581,0.00008933297,0.00017334816,0.00007193874],"domain_scores_gemma":[0.99800843,0.0011975226,0.00016093608,0.00014041782,0.00027748029,0.00021527291],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001942511,0.00030141647,0.0002920946,0.0007624243,0.0008765295,0.0034538896,0.0005966574,0.0017217211,0.0049837404],"category_scores_gemma":[0.004062294,0.00034307636,0.00028589956,0.0005107774,0.001341326,0.0030279357,0.0013423669,0.0012691602,0.00092379085],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022524958,0.00032063553,0.0041861674,0.00023547809,0.00005957021,0.00067220686,0.0019866969,0.07014507,0.003145117,0.7264254,0.012062982,0.18053536],"study_design_scores_gemma":[0.00012352654,0.00020797072,0.0023465496,0.00027156045,0.000093439,0.00046449786,0.0017311426,0.5237402,0.0032345208,0.3167183,0.15102302,0.00004525414],"about_ca_topic_score_codex":0.005020921,"about_ca_topic_score_gemma":0.0035981797,"teacher_disagreement_score":0.005020921,"about_ca_system_score_codex":0.0009741769,"about_ca_system_score_gemma":0.0011715585,"threshold_uncertainty_score":0.016672313},"labels":[],"label_agreement":null},{"id":"W2936215202","doi":"10.29173/mocs9","title":"Key Factors Affecting Construction Organizations' Acceptance of BIM: A Comparative Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Process (computing); Business; Structural equation modeling; Process management; Knowledge management; Construction industry; Key (lock); Questionnaire; Technology acceptance model; Usability; Engineering; Operations management; Construction engineering; Computer science","score_opus":0.010323544486848208,"score_gpt":0.21288204685320283,"score_spread":0.20255850236635461,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936215202","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99916244,0.000035929763,0.000049733662,0.000034545403,5.8124414e-7,0.000010533915,0.000009479308,9.707161e-7,0.0006958065],"genre_scores_gemma":[0.9996468,0.000081909115,0.000085726875,0.000012907766,9.4733576e-7,0.000015665611,0.00001768288,9.463623e-7,0.00013743817],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9962748,0.0016407131,0.00022088189,0.00026032998,0.00070955086,0.0008937317],"domain_scores_gemma":[0.9866803,0.0069067003,0.0027508847,0.0004359332,0.0020473998,0.001178653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006253963,0.00024640313,0.00033100304,0.002938297,0.0024953838,0.0023384432,0.00055167015,0.0005668595,0.0020720668],"category_scores_gemma":[0.011758606,0.00039167382,0.00035490686,0.004319568,0.0015805027,0.0018507413,0.0021724561,0.00058690493,0.00023458048],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019738043,0.00075833563,0.7447253,0.00019999505,0.000033998072,0.00067665684,0.2203605,0.00020049061,0.0007475997,0.0008542083,0.00030428497,0.030941365],"study_design_scores_gemma":[0.000008968799,0.00038872514,0.65069926,0.00007542521,0.00003172059,0.00018018353,0.34623754,0.00040505468,0.00021465526,0.00010951219,0.0016282347,0.00002060259],"about_ca_topic_score_codex":0.022840478,"about_ca_topic_score_gemma":0.033362012,"teacher_disagreement_score":0.022840478,"about_ca_system_score_codex":0.0037776611,"about_ca_system_score_gemma":0.0033520432,"threshold_uncertainty_score":0.045415044},"labels":[],"label_agreement":null},{"id":"W2936307821","doi":"10.29173/mocs42","title":"Training for Manufactured Construction (TRAMCON) – Benefits and Challenges for Workforce Development at Manufactured Housing Industry","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workforce; SAFER; Factory (object-oriented programming); Work (physics); Productivity; Training (meteorology); Curriculum; Quality (philosophy); Workforce development; Process (computing); Engineering; Engineering management; Business; Operations management; Economic growth; Computer science; Mechanical engineering","score_opus":0.04463706442607094,"score_gpt":0.22799795541332174,"score_spread":0.1833608909872508,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936307821","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.44999853,0.012089711,0.016291307,0.22798343,0.002280693,0.0004942339,0.00025199077,0.00044623535,0.2901639],"genre_scores_gemma":[0.8579705,0.0062580793,0.027745767,0.008088708,0.00040890154,0.00025867598,0.00022146903,0.00006673601,0.09898118],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989969,0.00027537762,0.000020203348,0.000058086036,0.0003003097,0.00034909204],"domain_scores_gemma":[0.9982331,0.0002864157,0.000114500035,0.00007390923,0.00034566785,0.00094644504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023016634,0.00021527964,0.00009883989,0.0004217727,0.0017186685,0.0017604077,0.0006950946,0.0011335507,0.0100697465],"category_scores_gemma":[0.0021158282,0.00010713155,0.00016384109,0.00031153552,0.00066715456,0.00087334524,0.0019940748,0.0012213466,0.0011615526],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065336804,0.00066971465,0.014451951,0.0005641714,0.000005586078,0.00031395702,0.0032207367,0.0010793258,0.0052627376,0.030766202,0.087648824,0.8559515],"study_design_scores_gemma":[0.00003169269,0.0011157556,0.11190201,0.0021142468,0.000016886395,0.0009727413,0.015433173,0.002595057,0.0042902175,0.009006057,0.85247403,0.000048186965],"about_ca_topic_score_codex":0.0074032033,"about_ca_topic_score_gemma":0.035828695,"teacher_disagreement_score":0.0100697465,"about_ca_system_score_codex":0.0023527816,"about_ca_system_score_gemma":0.010386188,"threshold_uncertainty_score":0.033686697},"labels":[],"label_agreement":null},{"id":"W2936431890","doi":"10.29173/mocs66","title":"Application of machine learning approach for logistics cost estimation in panelized construction","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cost estimate; Computer science; Integrated logistics support; Overhead (engineering); Learning effect; Cost driver; Operations research; Operations management; Industrial engineering; Business; Engineering; Systems engineering; Marketing; Economics","score_opus":0.013702169269918383,"score_gpt":0.2271460182649391,"score_spread":0.21344384899502072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936431890","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5137032,0.00094185915,0.4765398,0.00069673895,0.00014510233,0.00020884375,0.0012690718,0.0011453481,0.005349986],"genre_scores_gemma":[0.93819195,0.00026457882,0.058089487,0.00005807304,0.000039677565,0.00012317981,0.0011543913,0.00003343229,0.0020452847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99931526,0.00019676564,0.000068024776,0.00015097368,0.00015830554,0.00011066432],"domain_scores_gemma":[0.99781907,0.0013128001,0.00023815475,0.00010967197,0.0004627272,0.000057567322],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012237226,0.0009883308,0.0008898676,0.003052105,0.0004112206,0.0012069162,0.00095951464,0.0011680289,0.001809887],"category_scores_gemma":[0.0035743008,0.0003439288,0.00077478355,0.002429469,0.00024554852,0.0011208294,0.0004987182,0.0009217045,0.00043073198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011998268,0.00021654836,0.011242812,0.000060261154,0.0000544517,0.0001227596,0.000038587557,0.8709943,0.00053540396,0.00084555254,0.0014205273,0.11434883],"study_design_scores_gemma":[0.0000019909874,0.000015056773,0.0015780102,0.0000047375615,0.000004111518,0.000010232958,0.000018510666,0.9975425,0.0002250783,0.00044242627,0.00015222182,0.0000050815615],"about_ca_topic_score_codex":0.014220695,"about_ca_topic_score_gemma":0.007643233,"teacher_disagreement_score":0.014220695,"about_ca_system_score_codex":0.0012692708,"about_ca_system_score_gemma":0.0012042738,"threshold_uncertainty_score":0.028275847},"labels":[],"label_agreement":null},{"id":"W2936647771","doi":"10.29173/mocs64","title":"Construction industrialization and it integration: how tall wood buildings can show the right path towards construction 4.0","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Supply chain; Architectural engineering; Construction industry; Industrialisation; Path (computing); Order (exchange); Construction engineering; Computer science; Engineering; Business; Operations management; Marketing; Economics","score_opus":0.012123822031777934,"score_gpt":0.2026194617216751,"score_spread":0.1904956396898972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936647771","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09371895,0.007931463,0.06505383,0.052403163,0.0007056233,0.00007462607,0.00005369535,0.0005566635,0.77950203],"genre_scores_gemma":[0.92256993,0.005214416,0.02771137,0.0030984064,0.0002391456,0.00006895969,0.000092604365,0.00022831204,0.040776838],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9960834,0.0021524397,0.00008701558,0.00020835883,0.00087570644,0.00059300184],"domain_scores_gemma":[0.9983358,0.0006734002,0.00015133864,0.00022492842,0.00025994692,0.00035458326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003905923,0.000596154,0.00026461878,0.0017315471,0.0036983413,0.014097142,0.0007931277,0.0020857072,0.0109278355],"category_scores_gemma":[0.0035140323,0.0004076411,0.00042528537,0.002500388,0.010910137,0.014298907,0.008723544,0.0025041539,0.0015944828],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000532295,0.00009181554,0.004154573,0.00018220284,0.000021251319,0.00058736565,0.032977827,0.0010958585,0.0015307582,0.78852063,0.015763331,0.15502115],"study_design_scores_gemma":[0.000013892784,0.00013746881,0.0071615176,0.00077437575,0.000038725302,0.00074062427,0.053664092,0.00253008,0.001695077,0.30412754,0.629062,0.000054525408],"about_ca_topic_score_codex":0.0050519793,"about_ca_topic_score_gemma":0.007134181,"teacher_disagreement_score":0.014097142,"about_ca_system_score_codex":0.0035262003,"about_ca_system_score_gemma":0.0042442544,"threshold_uncertainty_score":0.036557198},"labels":[],"label_agreement":null},{"id":"W2936876376","doi":"10.29173/mocs8","title":"Integration of BIM and Computer Simulations in Modular Construction, A Case Study","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Chongqing Graduate Student Research Innovation Project","keywords":"Building information modeling; Modular design; Bridge (graph theory); Modular construction; Computer science; Discrete event simulation; Modularity (biology); Systems engineering; Productivity; Construction industry; Event (particle physics); Construction engineering; Software engineering; Engineering; Simulation; Operations management","score_opus":0.009325367435732571,"score_gpt":0.2080347975870605,"score_spread":0.19870943015132794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2936876376","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8787137,0.0005031316,0.076018184,0.0008346955,0.00003500762,0.00048359678,0.00024452698,0.00026326271,0.04290398],"genre_scores_gemma":[0.9424171,0.0003335545,0.053137597,0.000031606534,0.000008570764,0.00016991919,0.00011779684,0.00002976099,0.0037541229],"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","domain_scores_codex":[0.9980464,0.0012188412,0.000070619426,0.00009790559,0.00039717654,0.00016900072],"domain_scores_gemma":[0.9985051,0.000876172,0.000109293454,0.00018166871,0.0001809808,0.00014687644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002301473,0.00056904,0.00032446248,0.0013996277,0.0011939041,0.001648049,0.0010081937,0.0014415695,0.0035992258],"category_scores_gemma":[0.0028856394,0.00034113013,0.00049624377,0.0018748571,0.0012607354,0.001261145,0.0019930853,0.00057227374,0.00037065806],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010554178,0.0028103997,0.05814767,0.0008655332,0.000120145436,0.022020523,0.010681581,0.5255729,0.01606806,0.109383374,0.007241584,0.24603283],"study_design_scores_gemma":[0.00024770724,0.001737999,0.029429425,0.00039327936,0.00014180393,0.0043280395,0.014849407,0.8290724,0.01985108,0.019635784,0.08015876,0.0001542906],"about_ca_topic_score_codex":0.011073977,"about_ca_topic_score_gemma":0.01879137,"teacher_disagreement_score":0.011073977,"about_ca_system_score_codex":0.0016425132,"about_ca_system_score_gemma":0.0015254057,"threshold_uncertainty_score":0.022019029},"labels":[],"label_agreement":null},{"id":"W2937094644","doi":"10.29173/mocs40","title":"Mass Customisable Roofing Solutions for the New Build and Retrofit Markets in the UK","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Scottish Funding Council","keywords":"Roof; Truss; Scope (computer science); Architectural engineering; Architecture; Engineering; Factory (object-oriented programming); Multitude; Structural system; Civil engineering; Construction engineering; Computer science","score_opus":0.010084268500890062,"score_gpt":0.20075558669882732,"score_spread":0.19067131819793726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937094644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7670566,0.009220909,0.03334494,0.008336362,0.0006989435,0.0011793824,0.0006362464,0.0013446702,0.17818195],"genre_scores_gemma":[0.7234974,0.0081638675,0.06716382,0.0007523192,0.00010034443,0.00035163644,0.0008025021,0.00032051626,0.1988477],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991353,0.0000930161,0.000036397745,0.00010573037,0.00047852175,0.00015089642],"domain_scores_gemma":[0.99923563,0.00010524489,0.000095823365,0.0000937378,0.00029838373,0.00017119889],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010881148,0.00035943429,0.00017312384,0.00070207904,0.0007772227,0.0021193265,0.00051690795,0.0011400861,0.014713212],"category_scores_gemma":[0.0009960823,0.00031843822,0.00032011693,0.00047570828,0.0006533443,0.0015702567,0.001266673,0.0007579557,0.0024248704],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040744778,0.00087673176,0.006908385,0.00094270764,0.00001717819,0.0031406272,0.0055082887,0.007644493,0.26579008,0.04791544,0.041455213,0.61939335],"study_design_scores_gemma":[0.000102097016,0.0027610108,0.03683176,0.0005230699,0.00002946682,0.002341572,0.007331421,0.0083951615,0.04925672,0.003136247,0.88916713,0.00012440165],"about_ca_topic_score_codex":0.007988146,"about_ca_topic_score_gemma":0.022112506,"teacher_disagreement_score":0.014713212,"about_ca_system_score_codex":0.0029580407,"about_ca_system_score_gemma":0.0015701842,"threshold_uncertainty_score":0.049220562},"labels":[],"label_agreement":null},{"id":"W2937133234","doi":"10.29173/mocs48","title":"A New Graduate Course on Modular Construction: University of Nevada, Las Vegas","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Construction Industry Institute, University of Texas at Austin; University of Texas at Austin; University of Nevada, Las Vegas","keywords":"Modular programming; Las vegas; Modular design; Standardization; Engineering management; Engineering; Course (navigation); Computer science; Political science","score_opus":0.010951262123474227,"score_gpt":0.18782798710914742,"score_spread":0.1768767249856732,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937133234","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06500409,0.014556833,0.018196687,0.08160555,0.0255364,0.001017233,0.0020470268,0.0024257484,0.7896103],"genre_scores_gemma":[0.08875181,0.012228544,0.024634957,0.011513494,0.00231362,0.0008195294,0.0025939983,0.0006217396,0.85652226],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993773,0.00008489939,0.000024203824,0.00013072166,0.00021980751,0.0001631355],"domain_scores_gemma":[0.9990251,0.00006173437,0.00003665291,0.000023071309,0.00018964201,0.0006637976],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001114677,0.0010874666,0.0005393647,0.00086852786,0.0022696522,0.0022785997,0.0010131564,0.001546094,0.080816224],"category_scores_gemma":[0.0011089267,0.00037627295,0.0005440937,0.00039523726,0.00067865115,0.0017242909,0.0034308445,0.0033064366,0.017689018],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010880114,0.001807552,0.0046806573,0.00028050801,0.0000073965853,0.00081956375,0.0018301454,0.00084864855,0.0046724356,0.012525532,0.76828367,0.2041351],"study_design_scores_gemma":[0.000012158673,0.0001503946,0.0032279543,0.00023659329,0.000003333342,0.00023106458,0.00092999527,0.0003365985,0.0005010596,0.003183928,0.99117285,0.000014068976],"about_ca_topic_score_codex":0.005434268,"about_ca_topic_score_gemma":0.021792537,"teacher_disagreement_score":0.080816224,"about_ca_system_score_codex":0.0024523768,"about_ca_system_score_gemma":0.0067057493,"threshold_uncertainty_score":0.2703572},"labels":[],"label_agreement":null},{"id":"W2937193245","doi":"10.29173/mocs23","title":"Offsite Construction in the UK Housing Sector: Barriers and Challenges","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Salford Manchester","keywords":"Affordable housing; Business; Quality (philosophy); Production (economics); Manufacturing sector; Risk analysis (engineering); Engineering; Civil engineering; Economics","score_opus":0.011805641364467725,"score_gpt":0.18072909331786943,"score_spread":0.1689234519534017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937193245","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9226589,0.005596817,0.0023543611,0.02294454,0.00021318364,0.00014269419,0.00012314295,0.000040282423,0.045926075],"genre_scores_gemma":[0.9915891,0.0029739202,0.0009786646,0.00073271437,0.000017752744,0.000046026966,0.000051289284,0.000010318187,0.0036002353],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99148375,0.0029932216,0.0005227659,0.00047258288,0.0022360983,0.0022915425],"domain_scores_gemma":[0.99206793,0.003421932,0.0013330069,0.00034902705,0.0015498555,0.0012782849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048914994,0.00033471163,0.00036872335,0.0012643436,0.0041922806,0.0064137224,0.0012651942,0.001943135,0.006046049],"category_scores_gemma":[0.009741429,0.000485193,0.00023743282,0.002985381,0.0035608811,0.003375977,0.005769766,0.0013590539,0.0007203186],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036164728,0.00065652264,0.25139263,0.0028113488,0.00004642268,0.008790127,0.20613453,0.0019642042,0.0038543423,0.095346645,0.033410944,0.39523065],"study_design_scores_gemma":[0.000024759656,0.0003447653,0.23832141,0.0035607624,0.00003351918,0.0037088697,0.5386543,0.0021626074,0.00071475434,0.00843403,0.20393322,0.00010695972],"about_ca_topic_score_codex":0.10193099,"about_ca_topic_score_gemma":0.14180848,"teacher_disagreement_score":0.10193099,"about_ca_system_score_codex":0.010065949,"about_ca_system_score_gemma":0.008514486,"threshold_uncertainty_score":0.20267534},"labels":[],"label_agreement":null},{"id":"W2937277232","doi":"10.29173/mocs53","title":"Research and discussion over seismic performance of modular structure","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Key Research and Development Program of China; National Science Foundation","keywords":"Modular design; Modular construction; Connection (principal bundle); Frame (networking); Structural engineering; Steel frame; Computer science; Engineering; Mechanical engineering; Programming language","score_opus":0.012744022963956596,"score_gpt":0.24042617362512883,"score_spread":0.22768215066117223,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937277232","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57443714,0.034581576,0.2217636,0.0032005399,0.00065637095,0.000080738966,0.00046142412,0.00052047754,0.16429819],"genre_scores_gemma":[0.94914114,0.019339584,0.01761054,0.00019866873,0.00033150494,0.000035364195,0.00025240015,0.00011512448,0.012975651],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99936765,0.00010869622,0.000029428713,0.00012184085,0.00030249683,0.000069969385],"domain_scores_gemma":[0.99919695,0.0003024717,0.0000807616,0.00007381878,0.00029827433,0.000047777397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010451886,0.0005471092,0.00030952913,0.0008757626,0.0003444008,0.0007361727,0.00076457503,0.0007311281,0.0055785123],"category_scores_gemma":[0.0015582666,0.00021414467,0.00040930617,0.0013747764,0.0006026665,0.0014052063,0.00061517867,0.00046733604,0.00083008775],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035431402,0.00014806724,0.019937437,0.0025281697,0.00009613193,0.0010512428,0.002548052,0.107621424,0.14212736,0.08580232,0.0070684585,0.630717],"study_design_scores_gemma":[0.00005737928,0.0032764177,0.08846808,0.0013656558,0.00040626936,0.0039810566,0.0054039815,0.29605845,0.2689799,0.04884066,0.2828194,0.00034270284],"about_ca_topic_score_codex":0.0010561927,"about_ca_topic_score_gemma":0.0008040629,"teacher_disagreement_score":0.0055785123,"about_ca_system_score_codex":0.00055931177,"about_ca_system_score_gemma":0.0003117928,"threshold_uncertainty_score":0.018661976},"labels":[],"label_agreement":null},{"id":"W2937473149","doi":"10.29173/mocs17","title":"Measuring and Tracking Externalized Work to Support Industrialized Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Tacit knowledge; Work (physics); Explicit knowledge; Predictability; Computer science; Control (management); Industrialisation; Risk analysis (engineering); Externalization; Knowledge management; Industrial engineering; Operations research; Engineering; Business; Artificial intelligence; Economics; Civil engineering","score_opus":0.024475541612357102,"score_gpt":0.20583987920049232,"score_spread":0.18136433758813522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937473149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4281089,0.00021144266,0.5501796,0.0004068571,0.000028219414,0.00035963254,0.00013018482,0.000680278,0.01989491],"genre_scores_gemma":[0.94134504,0.00007873996,0.05783256,0.000009875512,0.000005933113,0.000065148924,0.000053059684,0.000026340047,0.00058332295],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99745375,0.0010112512,0.0001260885,0.00023884693,0.0010080752,0.00016205716],"domain_scores_gemma":[0.9929259,0.0028907857,0.00198559,0.000925629,0.0010918429,0.0001803486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034525227,0.0008696976,0.00040610417,0.002468348,0.00088633003,0.0025058065,0.0009563795,0.00049508037,0.0014156753],"category_scores_gemma":[0.008287428,0.00028691808,0.0002628,0.0014911473,0.0018158642,0.0028050349,0.0023335768,0.00063969573,0.00019798816],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053942355,0.0008055621,0.076073274,0.0004949708,0.000100501806,0.00035016873,0.006642441,0.30927828,0.0350165,0.05607118,0.001173626,0.5134541],"study_design_scores_gemma":[0.00005442183,0.0012921542,0.10553257,0.00035469356,0.00009388724,0.00019306476,0.0073536593,0.7796223,0.04940273,0.045562673,0.010299394,0.00023844905],"about_ca_topic_score_codex":0.0031090144,"about_ca_topic_score_gemma":0.005922161,"teacher_disagreement_score":0.0034525227,"about_ca_system_score_codex":0.0018985856,"about_ca_system_score_gemma":0.0020731408,"threshold_uncertainty_score":0.01825893},"labels":[],"label_agreement":null},{"id":"W2937517686","doi":"10.29173/mocs39","title":"Predictive Model for Siding Practice in Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Engineering; Bottleneck; Schedule; Industrial engineering; Duration (music); Workstation; Identification (biology); Lead time; Predictability; Operations research; Factory (object-oriented programming); Simulation; Reliability engineering; Operations management; Computer science; Mechanical engineering","score_opus":0.009971022277287269,"score_gpt":0.2220752535867429,"score_spread":0.21210423130945563,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937517686","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68597454,0.00022189734,0.30357912,0.00037089153,0.000053955933,0.00019728583,0.0014985343,0.0007122663,0.0073914737],"genre_scores_gemma":[0.98865426,0.000105883155,0.0068484386,0.000017845337,0.0000072515854,0.00013883636,0.00061181345,0.000019802235,0.0035958393],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938893,0.0001450595,0.000030200245,0.00019249636,0.00011854879,0.00012477643],"domain_scores_gemma":[0.99828583,0.0010346603,0.0002964962,0.000086534266,0.00024010698,0.000056379904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001477846,0.000830587,0.00066900515,0.0008039128,0.00041925322,0.0014759874,0.0013889173,0.0010992079,0.0037157496],"category_scores_gemma":[0.0028922171,0.0004960816,0.0008301661,0.00080842094,0.0005791793,0.00076921965,0.00069267536,0.0012722707,0.0006727175],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006384144,0.000066879606,0.006319043,0.000017125512,0.000016862388,0.000071666545,0.000053569136,0.9870565,0.0004093143,0.0011076647,0.00020777647,0.0046097115],"study_design_scores_gemma":[0.0000031206216,0.000018436873,0.0014390881,0.0000027297806,0.000004037487,0.0000064512956,0.000012981589,0.997917,0.000102620324,0.00040545326,0.00008354503,0.0000045747015],"about_ca_topic_score_codex":0.0320679,"about_ca_topic_score_gemma":0.019645529,"teacher_disagreement_score":0.0320679,"about_ca_system_score_codex":0.0015998214,"about_ca_system_score_gemma":0.0012342305,"threshold_uncertainty_score":0.063762486},"labels":[],"label_agreement":null},{"id":"W2937669126","doi":"10.29173/mocs11","title":"3d/4d Visualization Framework for Modelling Off-Site Productivity of Modular Construction Housing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Productivity; Computer science; Process (computing); Modular construction; Systems engineering; Construction engineering; Software; Building information modeling; Engineering; Software engineering; Engineering management; Operations management; Scheduling (production processes)","score_opus":0.011258894891506678,"score_gpt":0.2132279828235479,"score_spread":0.20196908793204124,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937669126","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011677292,0.00020244799,0.97779536,0.00023741952,0.000031422347,0.00010686925,0.00068754144,0.0021415933,0.007120171],"genre_scores_gemma":[0.20865163,0.0007457163,0.7852271,0.000044006134,0.000022429947,0.0003751217,0.0013647489,0.0005465687,0.0030226419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994717,0.00018671394,0.00005252489,0.00006151836,0.00017683301,0.00005076139],"domain_scores_gemma":[0.99947435,0.00021787987,0.00005221557,0.0000750098,0.00013703063,0.000043582415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012949328,0.0010889118,0.0006382016,0.0024951724,0.00076564495,0.003775134,0.0018307588,0.0014598047,0.0051156753],"category_scores_gemma":[0.0019320917,0.000695591,0.0017408014,0.0019767624,0.0009722146,0.0017205725,0.0022088543,0.0010396754,0.0008542796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007371989,0.000100413294,0.0024404083,0.00031059174,0.000056765442,0.00040970824,0.0020402893,0.8161334,0.008566502,0.100877956,0.004129849,0.064860456],"study_design_scores_gemma":[0.000013941637,0.000031646145,0.0008058158,0.00010622095,0.000022171445,0.00015542841,0.00034220953,0.9516993,0.0025977818,0.013417629,0.030749109,0.00005877928],"about_ca_topic_score_codex":0.02160566,"about_ca_topic_score_gemma":0.023503898,"teacher_disagreement_score":0.02160566,"about_ca_system_score_codex":0.0013126001,"about_ca_system_score_gemma":0.0017687567,"threshold_uncertainty_score":0.04295981},"labels":[],"label_agreement":null},{"id":"W2937847675","doi":"10.1061/(asce)me.1943-5479.0000698","title":"Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects","year":2019,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Rework; Risk analysis (engineering); Schedule; Modular programming; Modular design; Identification (biology); Risk management; Process (computing); Computer science; Engineering; Systems engineering; Reliability engineering; Business","score_opus":0.006958685917370178,"score_gpt":0.2139265249411759,"score_spread":0.20696783902380572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2937847675","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0071196537,0.0001990111,0.9883404,0.00039982912,0.000021104715,0.00020409923,0.00006798135,0.00022722167,0.0034206375],"genre_scores_gemma":[0.43080902,0.00061436306,0.56510067,0.00012765806,0.00007810645,0.0009273488,0.00032724775,0.000058636717,0.0019569846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99372053,0.0025195275,0.00053505786,0.0007283659,0.001968503,0.00052801264],"domain_scores_gemma":[0.9952545,0.0019673542,0.00094840897,0.0002195947,0.0013470433,0.0002630095],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009508935,0.0021583717,0.0015867499,0.0052921865,0.0013403,0.005015564,0.0032046135,0.0022143724,0.002435225],"category_scores_gemma":[0.008878502,0.0009151005,0.0017661586,0.002153786,0.0017269186,0.0034844077,0.004364085,0.0018000244,0.00039172627],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044890843,0.00015035253,0.0017106797,0.0001480081,0.00012958552,0.00022056824,0.000435767,0.881272,0.00114706,0.07645189,0.00085927587,0.037429936],"study_design_scores_gemma":[0.000018042361,0.000088201174,0.000423869,0.00008723589,0.00007040412,0.000068484835,0.00021524192,0.9596371,0.0005070247,0.036762815,0.0020842843,0.000037311733],"about_ca_topic_score_codex":0.008582234,"about_ca_topic_score_gemma":0.0076940595,"teacher_disagreement_score":0.009508935,"about_ca_system_score_codex":0.0035071846,"about_ca_system_score_gemma":0.0068531963,"threshold_uncertainty_score":0.050288677},"labels":[],"label_agreement":null},{"id":"W2938505096","doi":"10.29173/mocs24","title":"Lessons from Sweden: How Australia Can Learn from Swedish Industrialised Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Sustainability; Productivity; Politics; Quality (philosophy); Business; Political science; Economic growth; Geography; Economics","score_opus":0.02638576273885344,"score_gpt":0.23159322289459283,"score_spread":0.2052074601557394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938505096","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4750052,0.015679428,0.0017917763,0.10709194,0.0020111478,0.00008750716,0.00008589517,0.00008461165,0.39816248],"genre_scores_gemma":[0.8640394,0.016926564,0.0027138297,0.015217014,0.0003514888,0.00006515085,0.000120021534,0.00017615796,0.100390315],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.996707,0.0018747939,0.00010103781,0.0001884852,0.00044970767,0.00067903777],"domain_scores_gemma":[0.99795073,0.0007240718,0.00012993405,0.000117005846,0.0003521782,0.00072622043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004215734,0.0006943462,0.0005354469,0.0012831588,0.014761616,0.012172222,0.001423319,0.0025312786,0.0060620625],"category_scores_gemma":[0.0042358534,0.00045366332,0.00058214716,0.0013688711,0.006245333,0.0065549957,0.010587863,0.005746322,0.0017650393],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004848253,0.00015464627,0.0041198735,0.00033636348,0.000013799373,0.0040137256,0.8682155,0.00017845041,0.00032042048,0.033581376,0.027413785,0.061603513],"study_design_scores_gemma":[0.0000055533224,0.000054801803,0.0027052648,0.0008204286,0.000011303945,0.0006138661,0.6241243,0.0001258063,0.00018716378,0.006298819,0.3650309,0.000021877977],"about_ca_topic_score_codex":0.064253435,"about_ca_topic_score_gemma":0.19775653,"teacher_disagreement_score":0.064253435,"about_ca_system_score_codex":0.0077745677,"about_ca_system_score_gemma":0.011696074,"threshold_uncertainty_score":0.12775892},"labels":[],"label_agreement":null},{"id":"W2938571905","doi":"10.29173/mocs6","title":"Exploring the Benefits of Early Contractor Involvement (ECI) and the Mechanism for Automated 5D BIM Quantification Process in Offsite Modular Construction","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Building information modeling; Process (computing); Process management; Activity-based costing; Deliverable; Key (lock); Construction management; Risk analysis (engineering); Government (linguistics); Modular design; Cost reduction; Construction engineering; Engineering; Project management; Systems engineering; Operations management; Business; Computer science; Computer security; Civil engineering","score_opus":0.03177847418956445,"score_gpt":0.2128911346050904,"score_spread":0.18111266041552596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938571905","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6952568,0.00089565094,0.09232096,0.007641102,0.00018189834,0.000816522,0.00013767566,0.0002963875,0.2024529],"genre_scores_gemma":[0.9649696,0.00038346456,0.024231298,0.00043489123,0.000027634893,0.00019874726,0.000056354806,0.00008404213,0.009613994],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98468554,0.0078521455,0.0003380122,0.0009827148,0.0041640815,0.001977418],"domain_scores_gemma":[0.9694881,0.019019527,0.0025431851,0.0036560833,0.0032877915,0.0020053277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024696091,0.00043068535,0.00029289298,0.001022884,0.0023003926,0.008009754,0.0025786685,0.0019217316,0.014568012],"category_scores_gemma":[0.03345032,0.0007007001,0.0005524389,0.0009852313,0.0053905235,0.0091906795,0.008724274,0.0026436488,0.0014866897],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020397394,0.0034095254,0.05129717,0.000979774,0.00007457617,0.0013773028,0.039020035,0.016179144,0.012383157,0.50028706,0.0060906266,0.36686185],"study_design_scores_gemma":[0.0007079342,0.007766495,0.09036094,0.003176312,0.0002826307,0.002987508,0.11802668,0.15819944,0.041688535,0.26158178,0.31457806,0.0006437223],"about_ca_topic_score_codex":0.012758492,"about_ca_topic_score_gemma":0.0127811115,"teacher_disagreement_score":0.024696091,"about_ca_system_score_codex":0.004954585,"about_ca_system_score_gemma":0.008483702,"threshold_uncertainty_score":0.13060701},"labels":[],"label_agreement":null},{"id":"W2938668898","doi":"10.29173/mocs10","title":"Production Monitoring and Process Improvement for Floor Panel Manufacturing","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Installation; Process (computing); Factory (object-oriented programming); Modular design; Bridge (graph theory); Production (economics); Engineering; Production line; Computer science; Mechanical engineering","score_opus":0.011118841831716632,"score_gpt":0.2035844969300306,"score_spread":0.19246565509831398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938668898","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26535955,0.0014121307,0.7076324,0.0006890453,0.000111317895,0.0010081648,0.00036540587,0.0044337157,0.018988185],"genre_scores_gemma":[0.7973966,0.0006323148,0.1986443,0.00005247518,0.000020787646,0.00017319644,0.00031269,0.00008086947,0.0026866538],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99685234,0.0009344001,0.0001348791,0.0004259038,0.001470991,0.00018141295],"domain_scores_gemma":[0.9952305,0.0015752492,0.0007668821,0.0008281529,0.0014977646,0.000101491365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003726919,0.0007186558,0.0005430277,0.0013116953,0.00093896734,0.0017475554,0.0009701382,0.0007268071,0.0023917719],"category_scores_gemma":[0.0068984297,0.0004500761,0.0005400942,0.0012358932,0.0005026852,0.0017868774,0.00074203114,0.0006267026,0.0004484002],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071757083,0.0012321364,0.023107661,0.000656129,0.00005679287,0.00037040067,0.0011775688,0.1268781,0.06465326,0.004541303,0.0026081468,0.77400094],"study_design_scores_gemma":[0.00014890559,0.0024968265,0.050244305,0.0003023437,0.00018000438,0.00049456686,0.0013425271,0.7293242,0.17831668,0.0063696583,0.030623471,0.00015648823],"about_ca_topic_score_codex":0.0043059867,"about_ca_topic_score_gemma":0.00490559,"teacher_disagreement_score":0.0043059867,"about_ca_system_score_codex":0.0014615051,"about_ca_system_score_gemma":0.0020979354,"threshold_uncertainty_score":0.019710064},"labels":[],"label_agreement":null},{"id":"W2938947177","doi":"10.29173/mocs26","title":"Designing for Pre-Fabrication and Assembly in the Construction of UBCäó»s Tall Wood Building","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Procurement; Context (archaeology); Key (lock); Process (computing); Integrated project delivery; Engineering; Software deployment; Project team; Engineering design process; Construction engineering; Systems engineering; Computer science; Project management; Software engineering; Mechanical engineering; Operations management; Business","score_opus":0.00836181900101695,"score_gpt":0.211949529487032,"score_spread":0.20358771048601504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938947177","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68854475,0.0006876951,0.15762511,0.0011284552,0.00007555912,0.0006312451,0.000058244295,0.00081886054,0.15043001],"genre_scores_gemma":[0.7902534,0.0003366595,0.17267032,0.00009708015,0.000009383536,0.000100569065,0.000053581214,0.00013986288,0.036339138],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99807775,0.00069687044,0.000052967374,0.000120675286,0.00078186963,0.00026997123],"domain_scores_gemma":[0.99912065,0.0003517033,0.0000641564,0.000120043296,0.0001895202,0.00015394077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023595148,0.00046741206,0.00019132491,0.0007745089,0.0042899046,0.004012547,0.0009553895,0.0010116902,0.004029419],"category_scores_gemma":[0.0023221015,0.0006795271,0.00024745738,0.00046738036,0.0022774597,0.0011561821,0.0012726046,0.0012060129,0.0006511137],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004488209,0.0007522826,0.021421399,0.00060468714,0.000028975503,0.0054835626,0.039241657,0.098591715,0.113119856,0.113380454,0.009209213,0.59771734],"study_design_scores_gemma":[0.00013002452,0.003105428,0.08086677,0.0007093233,0.0001784102,0.0076766214,0.091620974,0.22732659,0.12867355,0.03370084,0.4254967,0.000514724],"about_ca_topic_score_codex":0.03594295,"about_ca_topic_score_gemma":0.1376668,"teacher_disagreement_score":0.03594295,"about_ca_system_score_codex":0.003107374,"about_ca_system_score_gemma":0.005734967,"threshold_uncertainty_score":0.07146746},"labels":[],"label_agreement":null},{"id":"W2938981478","doi":"","title":"Simulation of the environmental impact of a Canadian house","year":2005,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Environmental impact assessment; Computer science; Architectural engineering; Engineering; Political science; Law","score_opus":0.008801550303157945,"score_gpt":0.19852788306838762,"score_spread":0.18972633276522968,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2938981478","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9380382,0.00022137127,0.0071254317,0.00079004624,0.00010669174,0.000091178335,0.0034772013,0.00027768215,0.04987228],"genre_scores_gemma":[0.99132055,0.0001157462,0.0018730592,0.000037788315,0.00000417287,0.00002630859,0.0007831288,0.000028761653,0.0058105127],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997644,0.00003042448,0.000007165269,0.00003423683,0.00006951181,0.00009434458],"domain_scores_gemma":[0.9996101,0.00010697436,0.000022120821,0.000022890585,0.00012917964,0.00010873515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029753862,0.00074047,0.0007281784,0.0006818388,0.0018635428,0.0014464897,0.001774894,0.001963152,0.008222162],"category_scores_gemma":[0.001011751,0.00056837406,0.00072450395,0.001316951,0.0012183876,0.0005564659,0.0011265272,0.0010257429,0.00042885574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008145618,0.000049443897,0.0020829171,0.000018000092,0.00001388527,0.00014384638,0.000042516534,0.9940317,0.00049794023,0.0009776108,0.0007953511,0.0012652834],"study_design_scores_gemma":[0.000059283786,0.00004037636,0.0030938962,0.000010988026,0.000017588747,0.000012972369,0.00024125524,0.99445516,0.00040281974,0.00032760995,0.0013175964,0.000020372447],"about_ca_topic_score_codex":0.8783375,"about_ca_topic_score_gemma":0.8696217,"teacher_disagreement_score":0.1216625,"about_ca_system_score_codex":0.006690759,"about_ca_system_score_gemma":0.006943072,"threshold_uncertainty_score":0.24475795},"labels":[],"label_agreement":null},{"id":"W2939040710","doi":"10.29173/mocs19","title":"Applying the Flow-interception Location Model to Select the Location of Construction Industrial Yard","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Yard; Industrialisation; Material flow; Heuristic; Engineering; Transport engineering; Operations research; Civil engineering; Computer science; Economics","score_opus":0.015984891539291328,"score_gpt":0.20169534886597545,"score_spread":0.18571045732668412,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939040710","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041940298,0.0002305797,0.95053756,0.000327112,0.00006393661,0.0001464427,0.0003373052,0.00033204586,0.006084782],"genre_scores_gemma":[0.8324578,0.00061028823,0.15394437,0.00007509455,0.000042767184,0.00044208413,0.0009401085,0.000057713216,0.011429745],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934477,0.00015392392,0.000034938996,0.000220469,0.00011273059,0.00013328159],"domain_scores_gemma":[0.99949145,0.0002094551,0.000081915845,0.000028251747,0.0001368645,0.00005199524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009283774,0.0010311857,0.0010295787,0.0013999722,0.0008263072,0.0021917152,0.002503413,0.0016503611,0.00469146],"category_scores_gemma":[0.0015911964,0.00067914254,0.0015536131,0.0018276811,0.00073427014,0.002190019,0.001333556,0.0008877372,0.0006700375],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003503004,0.00003415731,0.0022048717,0.000044570224,0.000017427255,0.000084352585,0.0000670467,0.9723584,0.0004829326,0.009217827,0.00064269657,0.014810703],"study_design_scores_gemma":[0.000009485053,0.000025262909,0.0002609858,0.000006074048,0.000013124637,0.000018965451,0.00003065494,0.9963568,0.00013703824,0.002520615,0.0006097164,0.0000112119515],"about_ca_topic_score_codex":0.038840663,"about_ca_topic_score_gemma":0.024120886,"teacher_disagreement_score":0.038840663,"about_ca_system_score_codex":0.002333932,"about_ca_system_score_gemma":0.0028333946,"threshold_uncertainty_score":0.07722914},"labels":[],"label_agreement":null},{"id":"W2939173706","doi":"10.29173/mocs34","title":"Modular Industry Characteristics and Barriers to its Increased Market Share","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Work (physics); Engineering; Construction management; Business; Engineering management; Architectural engineering; Operations management; Construction engineering; Civil engineering; Marketing; Computer science","score_opus":0.0062029935869639735,"score_gpt":0.19105715839627652,"score_spread":0.18485416480931255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939173706","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.976583,0.00008086271,0.0002770952,0.00045738113,0.00000431859,0.000036295234,0.0001312381,0.000009572844,0.022420349],"genre_scores_gemma":[0.99678695,0.00006436746,0.00012802023,0.00003648816,0.000007530311,0.000009519368,0.00008907097,0.000005458355,0.0028725863],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979038,0.00021254408,0.00007459946,0.00019767688,0.0009665946,0.0006448658],"domain_scores_gemma":[0.9901073,0.002578076,0.0030094,0.0003411743,0.001786245,0.0021777186],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001931654,0.00010896609,0.00014703347,0.0019354692,0.00082779117,0.0023158411,0.0006525142,0.00047984763,0.017224824],"category_scores_gemma":[0.007151438,0.00016008143,0.00023997863,0.0018140656,0.00095059816,0.0014768322,0.0015193137,0.0006101034,0.001016473],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028177467,0.00049232395,0.9167467,0.00011290551,0.000022797218,0.0011271912,0.008668021,0.0007320667,0.0049510165,0.016560232,0.004029793,0.046275254],"study_design_scores_gemma":[0.000013510005,0.00012431736,0.9686992,0.00004437955,0.00000660236,0.000260421,0.011873486,0.0010861022,0.00070970855,0.0007480402,0.016414713,0.000019472673],"about_ca_topic_score_codex":0.026294822,"about_ca_topic_score_gemma":0.052863248,"teacher_disagreement_score":0.026294822,"about_ca_system_score_codex":0.002525971,"about_ca_system_score_gemma":0.0026122313,"threshold_uncertainty_score":0.05762273},"labels":[],"label_agreement":null},{"id":"W2939479925","doi":"10.1139/cjce-2017-0692","title":"Decision support method for estimating monetary value of post-renovation office buildings","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Value (mathematics); Architectural engineering; Engineering; Civil engineering; Computer science","score_opus":0.00584344617281284,"score_gpt":0.21039592933617954,"score_spread":0.2045524831633667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939479925","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16899015,0.00024411161,0.82688814,0.00026229996,0.00006303026,0.00023241327,0.0005512069,0.0007160587,0.0020526259],"genre_scores_gemma":[0.8795574,0.00017427627,0.11855828,0.00004870931,0.000031909844,0.00030540794,0.0005125984,0.000012128209,0.0007994392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930644,0.00021214205,0.000081987106,0.000132217,0.00019962931,0.0000675661],"domain_scores_gemma":[0.9983247,0.0010719103,0.00015888498,0.000041851257,0.00035147252,0.00005123363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016337165,0.0008332894,0.0009021527,0.002001398,0.0004174405,0.001216749,0.0010563617,0.0010091561,0.0026097156],"category_scores_gemma":[0.004330663,0.00031987653,0.0008109296,0.0011651608,0.0002276881,0.00093107997,0.0005626024,0.0007976146,0.0003624394],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005115611,0.00041973896,0.012518662,0.00021960566,0.00013131424,0.00031364048,0.00012143701,0.77978665,0.0032177488,0.0029052906,0.00130164,0.19855276],"study_design_scores_gemma":[0.000010909053,0.000040934923,0.0005655717,0.000007263919,0.0000101388505,0.000013312075,0.000016994332,0.99824786,0.00043450197,0.00051155844,0.00013547867,0.000005414296],"about_ca_topic_score_codex":0.007019336,"about_ca_topic_score_gemma":0.004115134,"teacher_disagreement_score":0.007019336,"about_ca_system_score_codex":0.0007380258,"about_ca_system_score_gemma":0.0013220494,"threshold_uncertainty_score":0.013956964},"labels":[],"label_agreement":null},{"id":"W2939569709","doi":"10.29173/mocs31","title":"Prefabricated Prefinished Volumetric Construction Joining Tech-niques Review","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation Singapore; National University of Singapore; National Research Foundation; Sembcorp Industries","keywords":"Constructability; Modular design; Computer science; Construction engineering; Engineering; Systems engineering","score_opus":0.008341770775595862,"score_gpt":0.19376896497600243,"score_spread":0.18542719420040657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939569709","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062262965,0.95675653,0.012019134,0.00028356106,0.0005473415,0.000074056734,0.00006851833,0.000065252956,0.023959309],"genre_scores_gemma":[0.032014996,0.9463419,0.011362741,0.00016817132,0.0003550804,0.0000737245,0.00026450751,0.000041502833,0.009377289],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988788,0.00010793893,0.00010203229,0.00015635934,0.000676083,0.000078757046],"domain_scores_gemma":[0.99865735,0.00051994255,0.00025452013,0.00008500563,0.00044706368,0.000036145102],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013075287,0.0007649744,0.000818001,0.0025287336,0.0003512363,0.0013526381,0.0012714396,0.0011361353,0.005001202],"category_scores_gemma":[0.0014940802,0.00049812335,0.00060732587,0.003173218,0.0005818548,0.0017054189,0.0006908028,0.00094787916,0.0027839323],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049521033,0.00011850171,0.00032955216,0.0115262745,0.000039486655,0.00017527671,0.00013569895,0.0033205468,0.009608751,0.011038657,0.008052517,0.95560515],"study_design_scores_gemma":[0.0000070993115,0.00025143276,0.0014423726,0.0020946309,0.000064542364,0.001402804,0.00013369841,0.0008761666,0.015113666,0.0020730519,0.9765053,0.00003522479],"about_ca_topic_score_codex":0.0013669989,"about_ca_topic_score_gemma":0.0017178489,"teacher_disagreement_score":0.005001202,"about_ca_system_score_codex":0.0006650428,"about_ca_system_score_gemma":0.0011214238,"threshold_uncertainty_score":0.016730726},"labels":[],"label_agreement":null},{"id":"W2939777093","doi":"10.29173/mocs35","title":"A BIM-based Supply Chain Integration for Prefabrication and Modularization","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Prefabrication; Supply chain; Schedule; Modular programming; Integrated project delivery; Precast concrete; Process (computing); Building information modeling; Manufacturing engineering; Systems engineering; Transport engineering; Computer science; Engineering; Operations management; Business; Civil engineering; Project management; Scheduling (production processes)","score_opus":0.006861548457437031,"score_gpt":0.1943483338728542,"score_spread":0.18748678541541716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939777093","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066526034,0.0001534918,0.9788286,0.0001924574,0.0000747682,0.00032064167,0.00018570153,0.0012871918,0.012304583],"genre_scores_gemma":[0.079689,0.00036417137,0.9116128,0.00006106932,0.000019459469,0.00036164073,0.0006992857,0.00015940299,0.007033083],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975764,0.0005712218,0.00013823502,0.0002914829,0.0012833972,0.00013935378],"domain_scores_gemma":[0.99915123,0.0001230668,0.000083192106,0.00017547808,0.00041247677,0.000054638742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002352303,0.0009745056,0.0005633947,0.0024579428,0.0012050569,0.0027167741,0.0013375016,0.000918324,0.00542076],"category_scores_gemma":[0.0022666126,0.00076583546,0.0010418454,0.0030993961,0.0005593152,0.0021878986,0.002423934,0.001136798,0.0016613251],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000098294855,0.0004669571,0.0029956235,0.00032087983,0.00010235944,0.00048174316,0.0008807402,0.25103736,0.025074227,0.08705034,0.010050607,0.62144095],"study_design_scores_gemma":[0.00003738373,0.00025682963,0.0028205295,0.00015810973,0.000075009746,0.00048478943,0.0003986748,0.83814734,0.025061518,0.01924914,0.11320883,0.000101738784],"about_ca_topic_score_codex":0.005819055,"about_ca_topic_score_gemma":0.006118778,"teacher_disagreement_score":0.005819055,"about_ca_system_score_codex":0.0015513352,"about_ca_system_score_gemma":0.0037447196,"threshold_uncertainty_score":0.018134296},"labels":[],"label_agreement":null},{"id":"W2939869739","doi":"10.29173/mocs46","title":"Addressing the Impact of Industrialized Components on the Cost of Temporary Heating in Cold-climate Regions","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuel efficiency; Schedule; Context (archaeology); Consumption (sociology); Cost estimate; Environmental science; Building envelope; Envelope (radar); Environmental economics; Engineering; Computer science; Meteorology; Automotive engineering; Economics; Telecommunications; Geography","score_opus":0.06484120816958823,"score_gpt":0.274656107593629,"score_spread":0.2098148994240408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939869739","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913551,0.00015547166,0.0038158898,0.000074096046,0.000005396412,0.000036552883,0.0003057761,0.000021975058,0.004229672],"genre_scores_gemma":[0.99816126,0.00012911092,0.0011447526,0.000004084132,0.0000010277591,0.000009622919,0.00013624495,0.000005005844,0.000408883],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996723,0.000092691684,0.0000073642864,0.000031805328,0.000072819785,0.00012306524],"domain_scores_gemma":[0.9993449,0.00036469445,0.000091695394,0.000029588391,0.00013038485,0.000038735405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005278171,0.0005852384,0.0002892593,0.0006328422,0.00042907876,0.0013583823,0.0009050614,0.00065146905,0.0012734291],"category_scores_gemma":[0.0012997617,0.00023745907,0.0006345335,0.0013343545,0.00043270446,0.0007474494,0.00046264613,0.00048527305,0.00009172629],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016688232,0.0001026357,0.030577201,0.00007054828,0.000038993956,0.00031446654,0.00008561789,0.9557546,0.0018453401,0.0022755845,0.00022357532,0.008544558],"study_design_scores_gemma":[0.000026821312,0.00027787234,0.09118085,0.000031817366,0.00009970136,0.000092943585,0.0015676187,0.8991786,0.005201007,0.0009077372,0.0013942942,0.000040751303],"about_ca_topic_score_codex":0.3144555,"about_ca_topic_score_gemma":0.3257825,"teacher_disagreement_score":0.3144555,"about_ca_system_score_codex":0.0049662967,"about_ca_system_score_gemma":0.002973842,"threshold_uncertainty_score":0.62525034},"labels":[],"label_agreement":null},{"id":"W2939946541","doi":"10.29173/mocs45","title":"Outcomes of the State-of-the-art Symposium: status, challenges and future directions of offsite construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Florida","keywords":"Bridge (graph theory); Modular design; Strengths and weaknesses; Construction industry; Economic shortage; Engineering; State (computer science); Factory (object-oriented programming); Adaptation (eye); Engineering management; Construction engineering; Architectural engineering; Business; Computer science","score_opus":0.005838141790964833,"score_gpt":0.18620917534503773,"score_spread":0.18037103355407288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2939946541","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27914318,0.08229743,0.02184652,0.33274058,0.034008414,0.00051179103,0.0015798619,0.00070791796,0.24716432],"genre_scores_gemma":[0.7956211,0.0547682,0.015891537,0.014118564,0.008379288,0.000339114,0.002735182,0.0004232789,0.10772377],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99270356,0.0020610008,0.00028327855,0.00049282075,0.0029511577,0.0015081378],"domain_scores_gemma":[0.98882324,0.0023872284,0.0007455875,0.00057919184,0.004112573,0.0033521312],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017661687,0.00084472564,0.0004849475,0.002041967,0.0039120913,0.009386589,0.0016654958,0.0030171203,0.0130207725],"category_scores_gemma":[0.010812302,0.00031034203,0.0007779959,0.0022796341,0.0030730944,0.005035172,0.009511985,0.004588324,0.0021843517],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045131514,0.0008832151,0.017444527,0.002199743,0.00005898737,0.00096414244,0.026819399,0.0016094829,0.007003384,0.048664328,0.3724438,0.5214577],"study_design_scores_gemma":[0.000011911436,0.00037552734,0.025798999,0.0014323826,0.0000294177,0.00042816057,0.03354094,0.0007307781,0.0030353372,0.0060713603,0.9284555,0.000089697314],"about_ca_topic_score_codex":0.0047977916,"about_ca_topic_score_gemma":0.014450724,"teacher_disagreement_score":0.017661687,"about_ca_system_score_codex":0.004393375,"about_ca_system_score_gemma":0.008024598,"threshold_uncertainty_score":0.09340507},"labels":[],"label_agreement":null},{"id":"W2940100037","doi":"10.29173/mocs37","title":"IoT-based Inventory Control System Framework for Panelized Construction","year":2018,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Schedule; Modular design; Computer science; Control (management); Inventory control; Frame (networking); Internet of Things; Production (economics); Systems engineering; Operations research; Engineering; Civil engineering; Computer security","score_opus":0.008280878571245565,"score_gpt":0.20135190700173664,"score_spread":0.19307102843049107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940100037","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0035526669,0.00024052591,0.9815424,0.00020533716,0.00010604341,0.000364305,0.00016746939,0.0027944073,0.011026865],"genre_scores_gemma":[0.52235425,0.0009786312,0.45509142,0.00029612487,0.00013281254,0.0016701126,0.0013477769,0.00024298132,0.01788599],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99942195,0.00009607441,0.00006682086,0.000113820905,0.00024486572,0.000056492594],"domain_scores_gemma":[0.9997782,0.00004062145,0.000028919507,0.000026718866,0.00009667906,0.000028845496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092640024,0.000626281,0.0005350171,0.00085122645,0.00076481915,0.0023675864,0.0020318774,0.0010204045,0.004540147],"category_scores_gemma":[0.000616175,0.000320254,0.00086272036,0.0005217825,0.0007788697,0.0015300243,0.001128595,0.0010554157,0.001029313],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027783512,0.00032508682,0.0027044145,0.00066631235,0.00014540134,0.002382812,0.0010295191,0.4609106,0.03322108,0.33588582,0.016760657,0.14569049],"study_design_scores_gemma":[0.00003826458,0.0000939115,0.00055121316,0.000087209926,0.000038804053,0.00019468083,0.00011193726,0.93756795,0.0044548227,0.0126136355,0.04420245,0.000045168897],"about_ca_topic_score_codex":0.011949303,"about_ca_topic_score_gemma":0.008909219,"teacher_disagreement_score":0.011949303,"about_ca_system_score_codex":0.001195716,"about_ca_system_score_gemma":0.0016760405,"threshold_uncertainty_score":0.023759484},"labels":[],"label_agreement":null},{"id":"W2940231597","doi":"10.29173/mocs54","title":"Design and static behavior of beam-to-beam-tied connection for modular steel buildings","year":2017,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Key Research and Development Program of China; National Science Foundation","keywords":"Structural engineering; Connection (principal bundle); Modular design; Diagonal; Beam (structure); Engineering; Computer science; Geometry; Mathematics","score_opus":0.015229061714965273,"score_gpt":0.2252084719210123,"score_spread":0.20997941020604702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940231597","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92800575,0.0001862015,0.06520438,0.00004933293,0.00003893077,0.00005094089,0.000071317736,0.00039089838,0.0060022264],"genre_scores_gemma":[0.99105513,0.000036545378,0.007802622,0.0000062301306,0.0000041151998,0.000018774617,0.000028866989,0.000017325736,0.0010303764],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997607,0.000037376245,0.0000101169435,0.000060853698,0.00010189298,0.000029021196],"domain_scores_gemma":[0.9997687,0.000018906065,0.00006733658,0.000032914108,0.00007443443,0.00003763583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00016127524,0.00043040482,0.00019137673,0.0005096904,0.00021225358,0.0002670514,0.0005599679,0.00039358158,0.0013097491],"category_scores_gemma":[0.000336105,0.00025646423,0.0001772163,0.00026032017,0.00018063617,0.00023709236,0.00028479504,0.000122041274,0.00038784326],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027196883,0.00015318146,0.010427884,0.0001920421,0.0000349271,0.000533579,0.00023350255,0.060463995,0.86449134,0.0018021263,0.0009580651,0.06043732],"study_design_scores_gemma":[0.000059167207,0.0039571743,0.052810084,0.00004871508,0.00015105936,0.0009055233,0.00024879863,0.5847623,0.34526876,0.0006346991,0.011047772,0.000105891995],"about_ca_topic_score_codex":0.00045534712,"about_ca_topic_score_gemma":0.0014408077,"teacher_disagreement_score":0.0013097491,"about_ca_system_score_codex":0.00022794765,"about_ca_system_score_gemma":0.00021933077,"threshold_uncertainty_score":0.0043815374},"labels":[],"label_agreement":null},{"id":"W2940370212","doi":"10.29173/mocs1","title":"Advancing Formwork Systems for the Production of Precast Concrete Building Elements: from Manual to Robotic","year":2016,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Technische Universität München; Deutscher Akademischer Austauschdienst","keywords":"Precast concrete; Formwork; Prefabrication; Production (economics); Flexibility (engineering); Engineering; Process (computing); Construction engineering; Productivity; Computer science; Civil engineering","score_opus":0.006812242377239999,"score_gpt":0.2075581749937642,"score_spread":0.20074593261652418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2940370212","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86209816,0.002521209,0.084161155,0.0005000361,0.00008141951,0.00040425512,0.000082016,0.00035396207,0.04979786],"genre_scores_gemma":[0.91931754,0.0017333067,0.06854478,0.000061327635,0.000017291954,0.000064208565,0.00007420178,0.00002172702,0.010165519],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993838,0.00009396625,0.000034512817,0.00009457626,0.0002925169,0.00010063155],"domain_scores_gemma":[0.9995962,0.00007099569,0.00007948282,0.00010379849,0.00011747819,0.00003205509],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068715075,0.0003826087,0.00017531878,0.0005806526,0.0004949041,0.0012443045,0.0005566807,0.00038361712,0.0026130937],"category_scores_gemma":[0.0006009841,0.00021223456,0.00044271155,0.00043664148,0.0010257561,0.0013258866,0.000984452,0.00041839704,0.0008048456],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00033091012,0.0003655033,0.030845841,0.0013667844,0.000056439003,0.0015018972,0.0047314307,0.022009013,0.22420135,0.028506927,0.001657824,0.68442607],"study_design_scores_gemma":[0.00014584156,0.0054730456,0.20610152,0.00077125395,0.0003002726,0.003785331,0.012902021,0.06439143,0.36998773,0.014042137,0.32176352,0.0003360182],"about_ca_topic_score_codex":0.011766377,"about_ca_topic_score_gemma":0.016810603,"teacher_disagreement_score":0.011766377,"about_ca_system_score_codex":0.0011483808,"about_ca_system_score_gemma":0.0013383368,"threshold_uncertainty_score":0.023395777},"labels":[],"label_agreement":null},{"id":"W2941209672","doi":"10.3390/buildings9050103","title":"Data-Driven Design as a Vehicle for BIM and Sustainability Education","year":2019,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Project-based learning; Design studio; Experiential learning; Curriculum; Competence (human resources); Computer science; Engineering management; Studio; Engineering education; Engineering; Mathematics education; Psychology; Pedagogy","score_opus":0.013736458038791838,"score_gpt":0.25711850122586705,"score_spread":0.2433820431870752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2941209672","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027596226,0.0008979772,0.9370623,0.0027326257,0.0001343308,0.00053137646,0.00015236427,0.00048660827,0.030406186],"genre_scores_gemma":[0.19359155,0.00086699234,0.7986024,0.00029673838,0.000019147416,0.000703967,0.00020286492,0.00015871806,0.005557632],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9925764,0.0043485896,0.00024224549,0.00037824677,0.0022602393,0.00019427693],"domain_scores_gemma":[0.99133,0.0052878214,0.00041654828,0.0011960143,0.0013473955,0.0004221159],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012893341,0.00067845685,0.0005293662,0.0025241768,0.0010715786,0.0045610927,0.0015254617,0.0010465612,0.0044502253],"category_scores_gemma":[0.014380504,0.0007244581,0.0005233807,0.0018079437,0.0023641335,0.0032453432,0.0040691635,0.0018020398,0.0010698951],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012875673,0.0010080814,0.007203021,0.0011329128,0.000058501926,0.00019477039,0.008911849,0.045881152,0.008374331,0.35304785,0.007814433,0.56624424],"study_design_scores_gemma":[0.0001095893,0.0009227261,0.003942052,0.0014433906,0.00005046815,0.000603775,0.0082298685,0.11388019,0.023090545,0.32953438,0.5180579,0.00013519816],"about_ca_topic_score_codex":0.0013566512,"about_ca_topic_score_gemma":0.0027818177,"teacher_disagreement_score":0.012893341,"about_ca_system_score_codex":0.0025759218,"about_ca_system_score_gemma":0.0048395866,"threshold_uncertainty_score":0.0681873},"labels":[],"label_agreement":null},{"id":"W2942550638","doi":"10.1139/cjce-2018-0287","title":"BIM-based building design coordination: processes, bottlenecks, and considerations","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Building information modeling; Process (computing); Documentation; Terminology; Systems engineering; Unavailability; Quality (philosophy); Risk analysis (engineering); Engineering design process; Computer science; Design process; Process management; Engineering; Work in process; Reliability engineering; Operations management; Business; Scheduling (production processes)","score_opus":0.008183486413252209,"score_gpt":0.175719144993077,"score_spread":0.1675356585798248,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942550638","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22572803,0.008796308,0.67659557,0.022142211,0.00024459846,0.0020560783,0.0007462575,0.0018314557,0.061859515],"genre_scores_gemma":[0.756524,0.003363053,0.23530556,0.0003078716,0.000084372026,0.0008028979,0.00050264125,0.00030233982,0.0028071238],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9576406,0.018716387,0.003221692,0.002797776,0.013621599,0.0040019383],"domain_scores_gemma":[0.9060706,0.04946604,0.009235156,0.008204684,0.023910614,0.0031129397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.059479944,0.0016989576,0.0013581631,0.005988547,0.004927563,0.01613014,0.0049485895,0.0022063241,0.003897319],"category_scores_gemma":[0.099428006,0.0019240681,0.00068276864,0.007416281,0.0053572357,0.021053722,0.0074512144,0.0028090656,0.0011890125],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041682232,0.00090662873,0.05389935,0.0029214716,0.00010050842,0.0009219868,0.022493578,0.08355621,0.0036995849,0.37485433,0.012660823,0.4435687],"study_design_scores_gemma":[0.00011028889,0.00055337476,0.035570547,0.0048140823,0.00017584125,0.0019876924,0.060278453,0.39255032,0.016978279,0.36874068,0.117736,0.0005044747],"about_ca_topic_score_codex":0.024491515,"about_ca_topic_score_gemma":0.014997881,"teacher_disagreement_score":0.059479944,"about_ca_system_score_codex":0.0099770585,"about_ca_system_score_gemma":0.01702747,"threshold_uncertainty_score":0.31456375},"labels":[],"label_agreement":null},{"id":"W2942955837","doi":"10.1139/cjce-2019-0019","title":"Introduction for Canadian Journal of Civil Engineering Special Issue of ICTIS 2017","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; University of Waterloo","funders":"","keywords":"Engineering; Civil engineering; Engineering ethics; Construction engineering; Forensic engineering","score_opus":0.004455960883173044,"score_gpt":0.1662300409362665,"score_spread":0.16177408005309346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2942955837","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007187042,0.016528798,0.0013800099,0.05082943,0.5986664,0.0004074022,0.011341581,0.001342368,0.3187853],"genre_scores_gemma":[0.0028500166,0.015666192,0.0010572128,0.009104932,0.10242265,0.00017364782,0.008220436,0.0008635767,0.8596413],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99665415,0.00009595812,0.00018985762,0.00021568537,0.0024315175,0.00041276176],"domain_scores_gemma":[0.97937495,0.0007838522,0.0005879696,0.00052214693,0.015348458,0.003382636],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002252564,0.0016008461,0.0016206516,0.00924616,0.003313805,0.007367984,0.002038987,0.0026292384,0.39308214],"category_scores_gemma":[0.008346444,0.0005113676,0.00114542,0.0057739248,0.0012348284,0.003065631,0.0026803468,0.0029872495,0.18459505],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064313517,0.0000065986196,0.00004545559,0.00005651836,7.9654643e-7,0.000013005385,0.0000047486756,0.00001667016,0.00003893633,0.00046764236,0.9904027,0.00894053],"study_design_scores_gemma":[0.000002670857,0.0000053911754,0.00046727425,0.00006989916,0.0000019800048,0.000029307133,0.000026241447,0.000024203937,0.000030258616,0.00032218255,0.9990151,0.0000054852153],"about_ca_topic_score_codex":0.08758996,"about_ca_topic_score_gemma":0.19438417,"teacher_disagreement_score":0.39308214,"about_ca_system_score_codex":0.005723204,"about_ca_system_score_gemma":0.022026831,"threshold_uncertainty_score":0.86569464},"labels":[],"label_agreement":null},{"id":"W2943191952","doi":"10.1139/cjce-2018-0411","title":"A visual dashboard to monitor BIM model dynamics","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Dashboard; Timeline; Building information modeling; Process (computing); Computer science; Track (disk drive); System dynamics; Systems engineering; Project management; Visibility; Information model; Process management; Engineering; Software engineering; Operations management; Artificial intelligence","score_opus":0.004052188704957662,"score_gpt":0.18080867815736243,"score_spread":0.17675648945240477,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2943191952","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38113332,0.0007045844,0.5341746,0.0010765896,0.0007690488,0.0023746614,0.007452047,0.046998687,0.025316482],"genre_scores_gemma":[0.6106918,0.0005382216,0.37280467,0.00025878925,0.0001150148,0.0017128987,0.005826333,0.00134436,0.0067080413],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9963631,0.0011176761,0.0004014979,0.00059524324,0.0013487387,0.00017381318],"domain_scores_gemma":[0.97774565,0.0098201325,0.0024233349,0.0029171624,0.005894707,0.0011990184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005078729,0.0016031631,0.0007057357,0.0049494114,0.0005343212,0.0029170658,0.0010360102,0.0007113154,0.005784191],"category_scores_gemma":[0.024119234,0.0005140623,0.00035898807,0.002691146,0.00048343875,0.0034917553,0.0022220132,0.0013765554,0.0012577742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022411135,0.0018840104,0.07124475,0.0016169123,0.00020433575,0.0007797699,0.011728908,0.017862827,0.05876049,0.009063735,0.04031132,0.7843019],"study_design_scores_gemma":[0.00059217674,0.004082814,0.18185644,0.001632863,0.00047154442,0.0010865611,0.013866875,0.4480858,0.11564279,0.013301607,0.21846294,0.000917581],"about_ca_topic_score_codex":0.0019746188,"about_ca_topic_score_gemma":0.0023172088,"teacher_disagreement_score":0.005784191,"about_ca_system_score_codex":0.0005208466,"about_ca_system_score_gemma":0.000988986,"threshold_uncertainty_score":0.026859224},"labels":[],"label_agreement":null},{"id":"W29448869","doi":"10.1080/00498254.2018.1438684","title":"Virtual design and construction in the AEC industry","year":2014,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Canadian Institutes of Health Research; Fondation du CHUM","keywords":"Construction industry; Engineering; Construction engineering; Architectural engineering; Business; Computer science","score_opus":0.00939402973206346,"score_gpt":0.18766757910364257,"score_spread":0.1782735493715791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W29448869","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010519559,0.00089705567,0.94940466,0.00067300873,0.0003032218,0.00034345905,0.00043399242,0.0031967578,0.03422829],"genre_scores_gemma":[0.17955853,0.002092508,0.7886875,0.0005290769,0.00010759392,0.0010539491,0.0020887984,0.0010184714,0.024863627],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977805,0.0009343875,0.00008439222,0.00026492495,0.00076158554,0.00017415144],"domain_scores_gemma":[0.9986092,0.0003116711,0.00008602762,0.00052929635,0.00031937176,0.00014436911],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034845995,0.0009114606,0.00070695183,0.0009694041,0.0006806124,0.0025199626,0.0018272229,0.0013428713,0.01860625],"category_scores_gemma":[0.0043112603,0.00051228644,0.0011741996,0.0010914505,0.00092665583,0.0019867169,0.0032844923,0.0014654407,0.007805675],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040632917,0.0003519792,0.0016821257,0.0005478449,0.00014430934,0.00037779042,0.00035723683,0.15253626,0.035217267,0.2845772,0.02482789,0.49897388],"study_design_scores_gemma":[0.00014948667,0.0006960988,0.00075175223,0.00018342496,0.00007700559,0.0004483512,0.00024754048,0.35418382,0.025896223,0.14588353,0.47141322,0.00006950357],"about_ca_topic_score_codex":0.0008338193,"about_ca_topic_score_gemma":0.00062427035,"teacher_disagreement_score":0.01860625,"about_ca_system_score_codex":0.0008792425,"about_ca_system_score_gemma":0.0014450043,"threshold_uncertainty_score":0.062244117},"labels":[],"label_agreement":null},{"id":"W2945333586","doi":"10.1061/(asce)cp.1943-5487.0000841","title":"Integrating Variance Reduction Techniques and Parallel Computing in Construction Simulation Optimization","year":2019,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Speedup; Computer science; Computation; Variance reduction; Reduction (mathematics); Simulation-based optimization; Mathematical optimization; Pareto principle; Software; Multi-objective optimization; Multi-core processor; Variance (accounting); Algorithm; Parallel computing; Mathematics","score_opus":0.004872380495895294,"score_gpt":0.21010894403770325,"score_spread":0.20523656354180794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2945333586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009135397,0.00019645932,0.9887136,0.00012611896,0.00002859239,0.00002984473,0.000012654325,0.00024929468,0.0015081458],"genre_scores_gemma":[0.55422795,0.00048709556,0.4435206,0.00009589779,0.0000703333,0.00019588556,0.000080211685,0.00017285223,0.001149168],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986395,0.0006171263,0.000060588096,0.00014084899,0.00043472013,0.00010716973],"domain_scores_gemma":[0.9988218,0.0006486648,0.000119651646,0.00014413334,0.00023091784,0.00003482015],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019256099,0.00093446695,0.0012737287,0.00089375384,0.000524112,0.00089470006,0.00093468284,0.00070726377,0.0009132413],"category_scores_gemma":[0.0034327852,0.00057808234,0.0013295017,0.0011642706,0.00083800656,0.00083454774,0.0011211926,0.001100416,0.00017164486],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015890366,0.000015353076,0.00024327126,0.00001953943,0.000027140048,0.000013565775,0.00000998044,0.98208237,0.00068630086,0.0047909953,0.0000997153,0.011995852],"study_design_scores_gemma":[0.0000026862024,0.000008434454,0.000038595663,0.0000016301998,0.0000040614677,0.000003726369,0.0000014377766,0.9975712,0.00023890442,0.001934101,0.00019280725,0.0000023670884],"about_ca_topic_score_codex":0.006999837,"about_ca_topic_score_gemma":0.005727799,"teacher_disagreement_score":0.006999837,"about_ca_system_score_codex":0.0010507547,"about_ca_system_score_gemma":0.0017544951,"threshold_uncertainty_score":0.013918221},"labels":[],"label_agreement":null},{"id":"W2946490062","doi":"10.5281/zenodo.3741343","title":"Reuse and recycling of CDW materials and structures in energy efficient prefabricated elements for building refurbishment and construction - RE4","year":2020,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"European Commission","keywords":"Reuse; Architectural engineering; Engineering; Construction engineering; Civil engineering; Waste management","score_opus":0.019480877925263394,"score_gpt":0.21757752074672632,"score_spread":0.19809664282146291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2946490062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91294265,0.0025305797,0.060723554,0.00023150403,0.00006914173,0.00033982837,0.0008288486,0.0004490884,0.021884756],"genre_scores_gemma":[0.92470783,0.0011305469,0.050085068,0.000050334056,0.0000065599575,0.00013921675,0.0012060128,0.00013189329,0.022542525],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99913484,0.00011270809,0.00003541677,0.00016053642,0.00042194672,0.00013454164],"domain_scores_gemma":[0.9997656,0.000020928379,0.000033246262,0.00007035147,0.00009093934,0.000018980709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011426591,0.00045324338,0.0003734163,0.0013412974,0.00059177465,0.0010575877,0.0005523831,0.0007319242,0.0016334372],"category_scores_gemma":[0.00042529267,0.0002223665,0.00053350977,0.0010791894,0.00047329566,0.00071738614,0.0009583873,0.00047358833,0.0009710348],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035014242,0.0003539326,0.0049273428,0.00040222012,0.000031606483,0.0004130883,0.00021598679,0.007948613,0.8778961,0.0048241722,0.0010234985,0.101613246],"study_design_scores_gemma":[0.000031099862,0.00037804266,0.0040095584,0.000022744682,0.000017833736,0.00020826927,0.00008706065,0.0022250214,0.97181576,0.0004128619,0.020779641,0.000012115767],"about_ca_topic_score_codex":0.0018978394,"about_ca_topic_score_gemma":0.004253187,"teacher_disagreement_score":0.0018978394,"about_ca_system_score_codex":0.0011303449,"about_ca_system_score_gemma":0.001228752,"threshold_uncertainty_score":0.0082012415},"labels":[],"label_agreement":null},{"id":"W2947500462","doi":"","title":"A new environment adapted to preliminary design in industry","year":2018,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.016418537229412326,"score_gpt":0.2048371305147428,"score_spread":0.18841859328533048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947500462","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034725198,0.00008574842,0.96332544,0.00010674872,0.00016107573,0.0001964921,0.00056306727,0.01917158,0.01291733],"genre_scores_gemma":[0.02832731,0.00029173688,0.9341036,0.00012513163,0.00006461817,0.00076048356,0.0019544743,0.012538189,0.021834444],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99788135,0.00054317305,0.00019178064,0.00034378766,0.0008924742,0.0001474036],"domain_scores_gemma":[0.996332,0.0013766625,0.00010386972,0.0013898052,0.0005182952,0.00027928324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030103533,0.0019977896,0.0012198136,0.0018939234,0.00089718297,0.0040466646,0.0030693132,0.0017495346,0.055506315],"category_scores_gemma":[0.00511938,0.0015887256,0.0023427042,0.0011435705,0.001330586,0.0033213967,0.0061649056,0.0027306294,0.018748878],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010762865,0.0011640617,0.0025225515,0.0020496603,0.00020971743,0.0020027368,0.006047104,0.0738626,0.116959676,0.13693312,0.0715375,0.58563507],"study_design_scores_gemma":[0.00023763598,0.0002972825,0.0015423121,0.00039538485,0.000103267936,0.001506726,0.00042955307,0.10089104,0.024662625,0.0444184,0.82531756,0.00019821346],"about_ca_topic_score_codex":0.0009576953,"about_ca_topic_score_gemma":0.001613171,"teacher_disagreement_score":0.055506315,"about_ca_system_score_codex":0.00043864918,"about_ca_system_score_gemma":0.0011516557,"threshold_uncertainty_score":0.18568712},"labels":[],"label_agreement":null},{"id":"W2947958109","doi":"","title":"The use of International Suppliers and the effects it has on Just-In-Time delivery and Industrial Construction Processes","year":2017,"lang":"en","type":"article","venue":"Student Research Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"MacEwan University","funders":"","keywords":"Supply chain; Business; Flexibility (engineering); Rationalization (economics); Lead time; Process management; Supply chain management; Risk analysis (engineering); Industrial organization; Operations management; Marketing; Engineering; Economics","score_opus":0.1042623942846613,"score_gpt":0.340098885532653,"score_spread":0.2358364912479917,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2947958109","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12676987,0.04588474,0.06970732,0.04792302,0.0024107248,0.00020378614,0.0006321586,0.0004456816,0.70602274],"genre_scores_gemma":[0.8402189,0.044924997,0.01899634,0.0071449825,0.0011708309,0.00020731534,0.00070281886,0.000614648,0.086019285],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.98901504,0.0039321543,0.00045718846,0.0011583654,0.004561635,0.00087560504],"domain_scores_gemma":[0.9804921,0.00775906,0.0032355865,0.0022792108,0.0045578894,0.0016761406],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00889611,0.0007716795,0.00035674253,0.0022269865,0.0029016633,0.011741922,0.001523647,0.001784631,0.019639954],"category_scores_gemma":[0.0139267575,0.00058341055,0.00062004075,0.0067123524,0.004543866,0.010186957,0.006867647,0.0029067793,0.0035679142],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023379036,0.00024001075,0.027723065,0.0014597845,0.0000890065,0.0014193808,0.020187674,0.0042443783,0.0040507456,0.49319398,0.048590366,0.3985679],"study_design_scores_gemma":[0.000018298573,0.00021647286,0.014491914,0.0016577967,0.000080618454,0.00090457697,0.018950548,0.0017639692,0.0029725025,0.04575752,0.9130636,0.00012224233],"about_ca_topic_score_codex":0.0058133444,"about_ca_topic_score_gemma":0.005142977,"teacher_disagreement_score":0.019639954,"about_ca_system_score_codex":0.0045905462,"about_ca_system_score_gemma":0.004568195,"threshold_uncertainty_score":0.06570214},"labels":[],"label_agreement":null},{"id":"W2948224781","doi":"10.11159/iccste19.143","title":"Comparative insight on building code paradigm shift practice and updates: International perspectives","year":2019,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Paradigm shift; Computer science; Code (set theory); Data science; Programming language; Software engineering; Epistemology","score_opus":0.012790167116247012,"score_gpt":0.2384150367254012,"score_spread":0.2256248696091542,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2948224781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6158199,0.036690142,0.009971862,0.023620842,0.00057541404,0.00007767538,0.0003625988,0.000052985062,0.31282857],"genre_scores_gemma":[0.9883642,0.007292022,0.0014925516,0.0005097324,0.000040546172,0.000020544489,0.00007584962,0.000019407289,0.0021850846],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946097,0.0023170852,0.00039205214,0.0005529037,0.0013852054,0.00074295537],"domain_scores_gemma":[0.98752254,0.0068044784,0.0018801605,0.0007406128,0.0025818823,0.00047039776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058525153,0.00023106764,0.00024745573,0.004304799,0.0022150984,0.0047007143,0.0005970977,0.0010095985,0.0028083979],"category_scores_gemma":[0.010937208,0.00018777826,0.00023240724,0.008982512,0.0059244465,0.005244473,0.0025663932,0.0021208175,0.00016626803],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012359569,0.000094669886,0.027949141,0.0011903477,0.0000325018,0.00092824106,0.16344038,0.001025282,0.0014384155,0.55803174,0.0047936854,0.24095194],"study_design_scores_gemma":[0.000010472964,0.00023904581,0.12474598,0.0034857618,0.000037971266,0.0011694753,0.4149349,0.00086072553,0.001989036,0.030160198,0.42227477,0.00009163882],"about_ca_topic_score_codex":0.007843463,"about_ca_topic_score_gemma":0.011763621,"teacher_disagreement_score":0.007843463,"about_ca_system_score_codex":0.0048681796,"about_ca_system_score_gemma":0.00464578,"threshold_uncertainty_score":0.035321295},"labels":[],"label_agreement":null},{"id":"W2950132006","doi":"10.57938/6a762b56-2213-4947-9be9-7fdea3c79bd3","title":"Headquarters of the future: The impact of digitalization on headquarters structures and value added","year":2019,"lang":"en","type":"article","venue":"WU Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Berger (Canada)","funders":"","keywords":"Value (mathematics); Business; Industrial organization; Political science; Operations management; Economics; Computer science","score_opus":0.014743233496333403,"score_gpt":0.29808266675846423,"score_spread":0.28333943326213085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2950132006","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9120692,0.00087595376,0.001180979,0.0022007155,0.000026730293,0.000026877224,0.00018090666,0.000027862568,0.083410695],"genre_scores_gemma":[0.9969965,0.00020916155,0.00025871416,0.000078856945,0.000012113338,0.0000044652706,0.000057912643,0.000005902083,0.0023762975],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99727196,0.0009375808,0.00010035265,0.00022621117,0.0008234785,0.0006404172],"domain_scores_gemma":[0.97777414,0.009318674,0.0064099156,0.0009968763,0.0031350728,0.0023651957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021443171,0.00017464506,0.0001463227,0.0017201263,0.001129671,0.0047651418,0.00060137146,0.0005194655,0.023646211],"category_scores_gemma":[0.01444082,0.00013967909,0.0002349431,0.002955204,0.0020402768,0.003899865,0.0031242617,0.00090467,0.0012819073],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024103206,0.0004135405,0.73465294,0.00025533262,0.00010110584,0.00063791865,0.015727468,0.002932736,0.0010793367,0.06077786,0.007400851,0.17577988],"study_design_scores_gemma":[0.0000136750505,0.00023835355,0.9043362,0.00020867847,0.000053422682,0.00022031277,0.043483973,0.0014608585,0.0014734314,0.008062589,0.040410686,0.000037812148],"about_ca_topic_score_codex":0.010756645,"about_ca_topic_score_gemma":0.015241412,"teacher_disagreement_score":0.023646211,"about_ca_system_score_codex":0.0041997563,"about_ca_system_score_gemma":0.0022452306,"threshold_uncertainty_score":0.07910442},"labels":[],"label_agreement":null},{"id":"W2952003046","doi":"10.1061/9780784482421.072","title":"Integrating Fuzzy Agent-Based Modeling and Multi-Criteria Decision-Making for Analyzing Construction Crew Performance","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources; University of Alberta","funders":"","keywords":"Crew; Decision support system; Multiple-criteria decision analysis; Fuzzy logic; Computer science; Operations research; Fuzzy set; Risk analysis (engineering); Management science; Engineering; Artificial intelligence; Business","score_opus":0.014300584952382208,"score_gpt":0.2539166227715008,"score_spread":0.23961603781911858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952003046","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023510825,0.00022105813,0.9722892,0.00030913044,0.00003247264,0.00011262498,0.00005134413,0.000071388014,0.003401966],"genre_scores_gemma":[0.579053,0.0004065229,0.41900387,0.00007541204,0.00003198962,0.00034156776,0.00007754364,0.000019980924,0.000990211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998242,0.0011120406,0.00008258095,0.00011316655,0.0003709343,0.00007925026],"domain_scores_gemma":[0.99790406,0.001476462,0.00023027374,0.000087963985,0.00022505489,0.00007617986],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032452368,0.0009146698,0.0009826148,0.0017303054,0.0007077715,0.0023439294,0.0013743208,0.0012933126,0.0012348313],"category_scores_gemma":[0.0046179965,0.00043958137,0.0009228887,0.0013379666,0.0007669309,0.0014230717,0.0010461858,0.0009869923,0.00015804828],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003475502,0.00007548759,0.0011797092,0.00009622359,0.00009084967,0.00008593135,0.00013761118,0.94692695,0.0008582317,0.031503584,0.00024083088,0.018769834],"study_design_scores_gemma":[0.000007807367,0.000024774945,0.00013923521,0.00001866487,0.000011997658,0.0000109687135,0.000050401446,0.98792565,0.00024545685,0.0109351715,0.0006179565,0.000012000243],"about_ca_topic_score_codex":0.0069922213,"about_ca_topic_score_gemma":0.008898098,"teacher_disagreement_score":0.0069922213,"about_ca_system_score_codex":0.0018330554,"about_ca_system_score_gemma":0.0020357033,"threshold_uncertainty_score":0.017162621},"labels":[],"label_agreement":null},{"id":"W2952447596","doi":"","title":"Analyzing BIM topics and clusters through ten years of scientific publications","year":2019,"lang":"en","type":"preprint","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Data science; Regional science; Library science; Engineering ethics; Engineering; Geography; Computer science","score_opus":0.015112203022045117,"score_gpt":0.24106079972884312,"score_spread":0.225948596706798,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2952447596","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6174549,0.25638303,0.016171385,0.005202258,0.0011129231,0.0017741587,0.064396694,0.0006584878,0.036846217],"genre_scores_gemma":[0.74969065,0.1387852,0.041063085,0.0009184218,0.0009498226,0.0037674455,0.05493568,0.0005639606,0.00932574],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97840905,0.0033920992,0.0054033645,0.0031339629,0.008486377,0.0011750881],"domain_scores_gemma":[0.876406,0.06846608,0.020005554,0.0030331048,0.029692866,0.002396415],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.01883083,0.0010270919,0.001899389,0.15712833,0.0022849338,0.0072761322,0.0013272756,0.0010687216,0.005363645],"category_scores_gemma":[0.0632397,0.00069063297,0.0019614748,0.17203283,0.0017794501,0.007372338,0.0055537843,0.0007647812,0.0015681022],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012051602,0.00017051061,0.20525406,0.09387628,0.0021921168,0.0027244568,0.07174908,0.0016709054,0.010886206,0.019154403,0.026970236,0.56414664],"study_design_scores_gemma":[0.00009362101,0.00042435978,0.45294845,0.035649844,0.003086718,0.0030559264,0.09398411,0.0020196198,0.005493957,0.012848503,0.39006978,0.0003251238],"about_ca_topic_score_codex":0.0034991577,"about_ca_topic_score_gemma":0.004865392,"teacher_disagreement_score":0.84287167,"about_ca_system_score_codex":0.0033338033,"about_ca_system_score_gemma":0.009174909,"threshold_uncertainty_score":0.099588156},"labels":[],"label_agreement":null},{"id":"W2953439837","doi":"10.29173/mocs126","title":"Consequences of the BC Energy Step Code on Offsite Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Sustainability; Efficient energy use; Building code; Building envelope; Architectural engineering; Construction industry; Norm (philosophy); Civil engineering; Engineering; Environmental economics; Construction engineering; Geography; Political science; Economics; Meteorology","score_opus":0.005395932876814841,"score_gpt":0.1748419891560745,"score_spread":0.16944605627925965,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953439837","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3462993,0.0010309116,0.005087543,0.01961803,0.0009948134,0.00017113388,0.0014710075,0.00039429413,0.62493294],"genre_scores_gemma":[0.83102816,0.0010436204,0.0037888784,0.00693123,0.000056220833,0.00007671853,0.0010127721,0.00027153778,0.15579078],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9887553,0.0005643175,0.00014856228,0.00040398588,0.008121729,0.002006086],"domain_scores_gemma":[0.9918875,0.0007315919,0.00032832185,0.00039157466,0.005616352,0.0010445501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023323747,0.00039691862,0.00022504377,0.0014306859,0.0071940464,0.0053743906,0.0012625458,0.0015979138,0.010458135],"category_scores_gemma":[0.007926295,0.00031185374,0.00044779602,0.0021751348,0.0032625517,0.00092827383,0.0036253643,0.0029991984,0.0010966088],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047742034,0.00046630626,0.08750699,0.0002820877,0.00004316477,0.004581634,0.011787713,0.011273071,0.00925144,0.35351968,0.24274287,0.2780676],"study_design_scores_gemma":[0.000031342886,0.000113703034,0.1354231,0.000518693,0.000033822515,0.0007626133,0.02231754,0.0043702773,0.0062778923,0.010394117,0.8195842,0.00017289462],"about_ca_topic_score_codex":0.92990756,"about_ca_topic_score_gemma":0.9684904,"teacher_disagreement_score":0.07009244,"about_ca_system_score_codex":0.044683143,"about_ca_system_score_gemma":0.05828339,"threshold_uncertainty_score":0.3242004},"labels":[],"label_agreement":null},{"id":"W2953527716","doi":"10.29173/mocs103","title":"Transfer Learning Enabled Process Recognition for Module Installation of High-rise Modular Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Automation; Computer science; Engineering; Convolutional neural network; Building automation; Embedded system; Software engineering; Systems engineering; Artificial intelligence; Operating system; Mechanical engineering","score_opus":0.006434172699105438,"score_gpt":0.1866436558455424,"score_spread":0.18020948314643698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953527716","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14612828,0.0019491108,0.8428632,0.00019064479,0.00010164542,0.000076148506,0.00020708806,0.002573862,0.005910053],"genre_scores_gemma":[0.9202591,0.0014920016,0.07361082,0.00006595134,0.000025096366,0.00005707569,0.00044662954,0.000053025036,0.003990317],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975497,0.000024308643,0.0000117677455,0.00006939233,0.000105325205,0.000034173518],"domain_scores_gemma":[0.99981517,0.00004324513,0.000036271314,0.000021689679,0.000075841206,0.000007902375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039410536,0.00062297017,0.00031115703,0.0007432357,0.00015337626,0.000552777,0.00065573474,0.0005383844,0.00093451195],"category_scores_gemma":[0.00074890174,0.00027548996,0.0007203089,0.0005739098,0.00024740666,0.00092446303,0.0004490074,0.00045757034,0.0003872169],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001664682,0.00018312987,0.006400959,0.00044978297,0.00009890201,0.0004164397,0.00016076515,0.35833693,0.04937719,0.0028167644,0.0021841584,0.5794085],"study_design_scores_gemma":[0.0000029226128,0.000060093524,0.0033189633,0.000017334423,0.000037952163,0.00009142298,0.000025080064,0.9740424,0.019572275,0.0008627919,0.0019551832,0.00001363543],"about_ca_topic_score_codex":0.006310919,"about_ca_topic_score_gemma":0.006252552,"teacher_disagreement_score":0.006310919,"about_ca_system_score_codex":0.0007561417,"about_ca_system_score_gemma":0.00055134814,"threshold_uncertainty_score":0.012548327},"labels":[],"label_agreement":null},{"id":"W2953581745","doi":"10.29173/mocs87","title":"Automatic Selection Tool of Quality Control Specifications for Off-site Construction Manufacturing Products: A BIM-based Ontology Model Approach","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Ontology; Information model; Quality (philosophy); Computer science; Quality assurance; Frame (networking); Product (mathematics); Control (management); Systems engineering; Engineering; Software engineering; Artificial intelligence","score_opus":0.01565666423060389,"score_gpt":0.20956941531777623,"score_spread":0.19391275108717235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953581745","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01480783,0.00010143899,0.9722101,0.00020142486,0.000030921572,0.00032288258,0.0010306783,0.0029310165,0.008363707],"genre_scores_gemma":[0.13710836,0.0003001934,0.8550305,0.00009618628,0.000009785349,0.00046810816,0.0036792092,0.00041792018,0.0028897221],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998669,0.0002434302,0.00012881614,0.0002067286,0.0006628914,0.00008913742],"domain_scores_gemma":[0.9987079,0.00041095435,0.00016468199,0.00022406105,0.00042630528,0.0000661336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017582765,0.000790674,0.00066147797,0.00333031,0.0008546766,0.0028209798,0.0013647486,0.0009646046,0.0027762423],"category_scores_gemma":[0.003649975,0.0006556145,0.001903376,0.0018359501,0.00062109623,0.0028106102,0.001795855,0.0009218709,0.0012042479],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031497123,0.001002464,0.012435303,0.0010019378,0.00023727822,0.0015193642,0.0036185752,0.18554094,0.044500068,0.17799374,0.023084229,0.54875106],"study_design_scores_gemma":[0.000045600733,0.0000547757,0.002167383,0.0001649535,0.00012188862,0.0003324988,0.00077888806,0.8989682,0.012237636,0.024750179,0.060312506,0.00006540924],"about_ca_topic_score_codex":0.010499976,"about_ca_topic_score_gemma":0.018205658,"teacher_disagreement_score":0.010499976,"about_ca_system_score_codex":0.0016889804,"about_ca_system_score_gemma":0.0030678804,"threshold_uncertainty_score":0.020877719},"labels":[],"label_agreement":null},{"id":"W2953662108","doi":"10.22260/isarc2019/0060","title":"Text Detection and Classification of Construction Documents","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Optical character recognition; Information retrieval; Set (abstract data type); Bounding overwatch; Task (project management); Minimum bounding box; Artificial intelligence; Class (philosophy); Character (mathematics); Document processing; Download; Deep learning; Document management system; Data set; Control (management); Natural language processing; Image (mathematics); World Wide Web","score_opus":0.0059783581220688164,"score_gpt":0.1911489674612615,"score_spread":0.1851706093391927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953662108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.84107316,0.00614418,0.09292684,0.0008793135,0.00041678542,0.000891416,0.035098042,0.010188487,0.0123817455],"genre_scores_gemma":[0.7441829,0.0013829342,0.18044007,0.00011209221,0.00017018535,0.00051740237,0.062355403,0.0002398886,0.0105990935],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988747,0.000109451794,0.00013361141,0.00028044893,0.00046699055,0.00013478115],"domain_scores_gemma":[0.99797875,0.0005848995,0.00032849275,0.00021274883,0.00078664324,0.00010847634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057906174,0.00084362255,0.00062225154,0.006203923,0.000440955,0.0010782742,0.00081588596,0.0008827914,0.0016835884],"category_scores_gemma":[0.0027415936,0.00016011592,0.00067691325,0.0030676501,0.0003177471,0.0008875115,0.0006012429,0.0005977084,0.0025756878],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069709733,0.00040857,0.02678534,0.0009198394,0.00008516471,0.00071832584,0.00032115733,0.007854677,0.04036494,0.000662526,0.026799342,0.894383],"study_design_scores_gemma":[0.000121342564,0.0006586679,0.1756923,0.00041617404,0.00018768024,0.002646853,0.002003676,0.51926273,0.2229759,0.002525126,0.0733788,0.00013075405],"about_ca_topic_score_codex":0.00531645,"about_ca_topic_score_gemma":0.0054259477,"teacher_disagreement_score":0.006203923,"about_ca_system_score_codex":0.00073012646,"about_ca_system_score_gemma":0.00065630814,"threshold_uncertainty_score":0.010571003},"labels":[],"label_agreement":null},{"id":"W2953682657","doi":"10.22260/isarc2019/0016","title":"Implementation Framework for BIM Adoption and Project Management in Public Organizations","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Government (linguistics); Corporate governance; Process management; Software deployment; Business; Public sector; Order (exchange); Knowledge management; Computer science; Operations management; Engineering; Economics; Finance","score_opus":0.011916885738890198,"score_gpt":0.24777421017786458,"score_spread":0.2358573244389744,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953682657","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010102689,0.0005256035,0.9255283,0.003514822,0.00010026297,0.0024048318,0.00037921037,0.0010838299,0.056360427],"genre_scores_gemma":[0.11699059,0.00049274217,0.87043715,0.00025951996,0.000038918028,0.0034502307,0.0009343316,0.00014217172,0.0072543267],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9823172,0.01021737,0.0018766479,0.0011631493,0.0032228262,0.0012027625],"domain_scores_gemma":[0.99149406,0.004124782,0.0007553455,0.0007408732,0.0024559177,0.0004290686],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019889705,0.0011631015,0.0007405106,0.006811386,0.0024468843,0.0072776764,0.0030949987,0.0038303977,0.009324625],"category_scores_gemma":[0.013275486,0.00095179817,0.001929685,0.00406039,0.0036870383,0.005934551,0.0048993644,0.0030209508,0.0021073772],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034246477,0.00024497608,0.0017310557,0.00035714926,0.000031689488,0.00030589028,0.0039856597,0.009971608,0.0010842477,0.9130131,0.0033335532,0.065906845],"study_design_scores_gemma":[0.00017451207,0.0004481732,0.0058267745,0.0033947283,0.00016957542,0.0010721904,0.01148889,0.16438597,0.0035963797,0.42063513,0.38858572,0.00022191706],"about_ca_topic_score_codex":0.012109783,"about_ca_topic_score_gemma":0.009629649,"teacher_disagreement_score":0.019889705,"about_ca_system_score_codex":0.0073352987,"about_ca_system_score_gemma":0.013658981,"threshold_uncertainty_score":0.10518801},"labels":[],"label_agreement":null},{"id":"W2953811449","doi":"10.29173/mocs131","title":"A Survey on Information Flow Tools in Alberta’s Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Digitization; Information flow; Supply chain; Schedule; Information exchange; Key (lock); Phone; Quality (philosophy); Construction industry; Business; Dissemination; Computer science; Process management; Knowledge management; Marketing; Engineering; Construction engineering; Telecommunications; Computer security","score_opus":0.009220101536522788,"score_gpt":0.19234379812503383,"score_spread":0.18312369658851105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953811449","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96251476,0.004092408,0.0015063399,0.0010915272,0.000049686587,0.00017792736,0.0012515902,0.00007716333,0.029238544],"genre_scores_gemma":[0.9593108,0.013843979,0.004898801,0.000603881,0.000028171798,0.000135808,0.002494904,0.000050610968,0.018632997],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9933294,0.0007096936,0.00046727277,0.00027182032,0.0042756223,0.00094624725],"domain_scores_gemma":[0.9857684,0.0051258854,0.0019823774,0.00040761422,0.005350551,0.0013652567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004794275,0.00035673947,0.00033687396,0.00810768,0.0018594719,0.003033787,0.0010349952,0.0008255128,0.0028504692],"category_scores_gemma":[0.007249045,0.00037608301,0.00031716964,0.014033833,0.0012372442,0.0015364768,0.0013810516,0.00065402064,0.0005611008],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018043985,0.0003100257,0.5401444,0.0017509399,0.000053707314,0.0012547089,0.1021816,0.00047304304,0.008338629,0.0030824272,0.010185041,0.33204496],"study_design_scores_gemma":[0.0000056966323,0.00020523177,0.76714396,0.00091778586,0.000033280823,0.0005678451,0.11559806,0.0003492755,0.0010240199,0.00019234231,0.11390582,0.000056590132],"about_ca_topic_score_codex":0.4110869,"about_ca_topic_score_gemma":0.54770833,"teacher_disagreement_score":0.5889131,"about_ca_system_score_codex":0.009120474,"about_ca_system_score_gemma":0.015780421,"threshold_uncertainty_score":0.8173882},"labels":[],"label_agreement":null},{"id":"W2953859525","doi":"10.22260/isarc2019/0007","title":"BIM-based Takt-Time Planning and Takt Control: Requirements for Digital Construction Process Management","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lean construction; Process management; Process (computing); Engineering; Building information modeling; Production planning; Computer science; Manufacturing engineering; Systems engineering; Construction engineering; Operations management; Production (economics); Construction industry","score_opus":0.0061414955240490345,"score_gpt":0.2037670396461865,"score_spread":0.19762554412213748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953859525","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018379271,0.0013607565,0.9801906,0.001334007,0.00020234578,0.00034518202,0.00010916391,0.00059413945,0.014025966],"genre_scores_gemma":[0.13019206,0.0040795417,0.8549534,0.00046504705,0.0003477746,0.0015798614,0.00085068215,0.00050583173,0.0070257415],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.991083,0.0012991563,0.00068949,0.000501999,0.0060775224,0.00034876566],"domain_scores_gemma":[0.98957753,0.0040899776,0.0007387046,0.0011861628,0.0039465884,0.00046109082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068951114,0.0014604792,0.0020177471,0.0021066864,0.0012263433,0.0066226325,0.0033128478,0.002680194,0.0053815804],"category_scores_gemma":[0.015703104,0.001042758,0.0015988126,0.0022874908,0.0025706347,0.005980713,0.0041009574,0.0034725184,0.0026347146],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001910175,0.00021115941,0.0007442025,0.0012029884,0.000059471025,0.0005808765,0.0007118167,0.30436233,0.0112195285,0.28445333,0.010297013,0.3859663],"study_design_scores_gemma":[0.0000810035,0.00022086753,0.00087810017,0.00064302026,0.000074014955,0.0008453076,0.00053539895,0.73874354,0.006149313,0.12623224,0.12538253,0.00021465479],"about_ca_topic_score_codex":0.004588335,"about_ca_topic_score_gemma":0.0021167828,"teacher_disagreement_score":0.0068951114,"about_ca_system_score_codex":0.0019281831,"about_ca_system_score_gemma":0.0042866627,"threshold_uncertainty_score":0.036465287},"labels":[],"label_agreement":null},{"id":"W2953903615","doi":"10.29173/mocs85","title":"Just-in-Time Delivery Requires Just-in-Time Production X2 – Sychronising Factory and Site for Successful Prefabrication","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Factory (object-oriented programming); Schedule; Production (economics); Work (physics); Critical path method; Production schedule; Operations management; Order (exchange); Computer science; Operations research; Engineering; Business; Scheduling (production processes); Civil engineering; Systems engineering; Finance","score_opus":0.007860013978445287,"score_gpt":0.2019397066099514,"score_spread":0.1940796926315061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953903615","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03546256,0.0005786086,0.7981864,0.0031881402,0.00070992735,0.001081147,0.00013814642,0.0042649275,0.15639013],"genre_scores_gemma":[0.39871025,0.0008240152,0.50535244,0.0007810031,0.00012246234,0.00064908393,0.00028176117,0.0017081964,0.09157075],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957171,0.0012321821,0.00030028244,0.00051044166,0.0016451179,0.0005947367],"domain_scores_gemma":[0.9916181,0.0025521524,0.0008998659,0.0027751464,0.0016277242,0.000527056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006737815,0.0010115048,0.0005977471,0.00088469236,0.0020797777,0.0052600815,0.0020193877,0.0018456648,0.02887529],"category_scores_gemma":[0.008958726,0.0010982042,0.00077565224,0.0008553817,0.0030683747,0.007938498,0.00493332,0.0021508909,0.011765711],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000554758,0.00054923486,0.0048827487,0.0013318645,0.000045160752,0.0012726932,0.011924433,0.020443033,0.03611794,0.26874176,0.028460838,0.6256756],"study_design_scores_gemma":[0.00015083488,0.00223167,0.011101676,0.0009771412,0.000089715635,0.003776834,0.011363036,0.032402765,0.046421316,0.18573761,0.7054176,0.00032982024],"about_ca_topic_score_codex":0.0028181148,"about_ca_topic_score_gemma":0.004303961,"teacher_disagreement_score":0.02887529,"about_ca_system_score_codex":0.001911933,"about_ca_system_score_gemma":0.005821872,"threshold_uncertainty_score":0.09659749},"labels":[],"label_agreement":null},{"id":"W2953915164","doi":"10.29173/mocs134","title":"Mass Timber in High-Rise Buildings: Modular Design and Construction; Permitting and Contracting Issues","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Documentation; Adaptability; Process (computing); Architectural engineering; Construction engineering; Engineering; Risk analysis (engineering); Order (exchange); Flexibility (engineering); Business; Computer science","score_opus":0.005312865482763209,"score_gpt":0.18984113200233252,"score_spread":0.1845282665195693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953915164","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46243006,0.08527172,0.1583238,0.009194843,0.00038563975,0.00059048674,0.00025584115,0.00020399125,0.28334358],"genre_scores_gemma":[0.91610897,0.020479757,0.040959876,0.0005549297,0.000106495296,0.00012771906,0.00010357298,0.00006839784,0.021490354],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9946523,0.0023723065,0.00024011669,0.0003145235,0.0020974283,0.00032337158],"domain_scores_gemma":[0.9952123,0.0027947437,0.0008376192,0.0002896195,0.00067976554,0.00018586342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046654884,0.00031709738,0.00016952112,0.0011996336,0.0019570487,0.0025731777,0.0011378163,0.000907028,0.003759255],"category_scores_gemma":[0.0052115405,0.00027117762,0.00024720718,0.0028092805,0.0035836587,0.0019525635,0.0012524918,0.0009029791,0.00049257564],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007608514,0.00013137686,0.018619554,0.0051267757,0.00003334566,0.005534149,0.055794492,0.007590664,0.011001335,0.3098692,0.007861637,0.57836133],"study_design_scores_gemma":[0.0000091932825,0.00023960373,0.05775122,0.0036517442,0.00005167882,0.0060141576,0.056937203,0.0026983868,0.009019998,0.036530696,0.8270099,0.00008615252],"about_ca_topic_score_codex":0.009213326,"about_ca_topic_score_gemma":0.03918813,"teacher_disagreement_score":0.009213326,"about_ca_system_score_codex":0.0036902768,"about_ca_system_score_gemma":0.005256111,"threshold_uncertainty_score":0.026774943},"labels":[],"label_agreement":null},{"id":"W2953959273","doi":"10.29173/mocs111","title":"Development of a Design-Driven Parametric Mass Timber Construction System for Modular High-Rise Urban Housing","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Modular design; Architectural engineering; Architecture; Process (computing); Engineering; Civil engineering; Sustainability; Construction engineering; Sustainable development; Parametric statistics; Retrofitting; Computer science; Systems engineering; Geography; Structural engineering","score_opus":0.009357393229763351,"score_gpt":0.1830701828570766,"score_spread":0.17371278962731326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953959273","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050391488,0.00003459036,0.93375474,0.000052410312,0.000030233903,0.000387511,0.00014252716,0.008153806,0.00705272],"genre_scores_gemma":[0.4278422,0.00009291193,0.5612718,0.000057533907,0.000020319732,0.0005766176,0.0006594682,0.0010638426,0.008415319],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99939454,0.00009470832,0.000030187686,0.00008969617,0.00034365762,0.000047152793],"domain_scores_gemma":[0.9994879,0.00013166967,0.000039905553,0.0001544583,0.00013357212,0.000052435298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085353106,0.00061424566,0.0004040381,0.0004144599,0.00032315784,0.00069857977,0.0013402776,0.0005037097,0.006926813],"category_scores_gemma":[0.0012035193,0.0003664454,0.0005481646,0.00017664101,0.00033516347,0.00063154346,0.0010532265,0.0005840821,0.0017243426],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046212538,0.00042188537,0.0060284557,0.000507409,0.000115017516,0.0008776375,0.0019812451,0.28263593,0.29301488,0.01284871,0.006951795,0.3941549],"study_design_scores_gemma":[0.00014041168,0.00093427586,0.0062312894,0.00007851849,0.000092238304,0.00087104103,0.000253983,0.7888486,0.114939526,0.0039061075,0.08355581,0.00014820418],"about_ca_topic_score_codex":0.000782844,"about_ca_topic_score_gemma":0.0010828344,"teacher_disagreement_score":0.006926813,"about_ca_system_score_codex":0.00037222283,"about_ca_system_score_gemma":0.0008011463,"threshold_uncertainty_score":0.023172498},"labels":[],"label_agreement":null},{"id":"W2953967953","doi":"10.22260/isarc2019/0137","title":"Simulating Wood-framing Wall Panels Production with Timed Coloured Petri Nets","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Framing (construction); Petri net; Computer science; Digitization; Building information modeling; Dataflow; Modular programming; Original equipment manufacturer; Context (archaeology); Compatibility (geochemistry); Systems engineering; Industrial engineering; Software engineering; Architectural engineering; Engineering; Programming language","score_opus":0.006493341614220795,"score_gpt":0.18416065318796065,"score_spread":0.17766731157373986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953967953","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71260273,0.00020206154,0.27175018,0.00014840771,0.000124784,0.0002113243,0.00081443536,0.00085622026,0.013289827],"genre_scores_gemma":[0.9803805,0.00008110301,0.017374648,0.000013490113,0.000003832466,0.000092060705,0.00022213339,0.000032353382,0.0017998314],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969375,0.0000994901,0.000016622422,0.00005495219,0.000069668036,0.000065594024],"domain_scores_gemma":[0.9985275,0.0011465163,0.00008092045,0.000050087678,0.000119633056,0.00007530957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070571253,0.0009131213,0.0004524131,0.0006334945,0.00041912298,0.0010795781,0.0008566595,0.0010583688,0.0033384173],"category_scores_gemma":[0.0017848706,0.00043816253,0.00095080613,0.00047772407,0.0007459725,0.00049438997,0.0006904316,0.00060811796,0.0002502025],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002787078,0.000018912164,0.0004750801,0.000012399706,0.000004857671,0.000038998565,0.00002147964,0.99764204,0.00054165424,0.0004357907,0.000028560193,0.0007523683],"study_design_scores_gemma":[0.0000044500066,0.000011919516,0.00014388414,0.0000029025148,0.0000036182162,0.0000029868922,0.00001200115,0.99900514,0.00047296254,0.0002593971,0.000078207864,0.0000025937159],"about_ca_topic_score_codex":0.024628138,"about_ca_topic_score_gemma":0.016163213,"teacher_disagreement_score":0.024628138,"about_ca_system_score_codex":0.0011275617,"about_ca_system_score_gemma":0.0011657187,"threshold_uncertainty_score":0.048969567},"labels":[],"label_agreement":null},{"id":"W2953983168","doi":"10.22260/isarc2019/0058","title":"A Chatbot System for Construction Daily Report Information Management","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Chatbot; Computer science; World Wide Web","score_opus":0.004110527566773909,"score_gpt":0.17399805556844855,"score_spread":0.16988752800167464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953983168","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074215814,0.0011169576,0.62017804,0.00060235005,0.0005522559,0.0027336264,0.0026423866,0.27888587,0.019072676],"genre_scores_gemma":[0.5081406,0.0007688907,0.4132507,0.00071124296,0.00055007054,0.0040620007,0.0124682775,0.006081933,0.053966265],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982192,0.00058808125,0.00016694781,0.00035596415,0.00052125263,0.00014858333],"domain_scores_gemma":[0.99587667,0.0018984246,0.00022694193,0.00051433715,0.00083544577,0.00064815994],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029064338,0.0010725209,0.0008675808,0.0021716591,0.0009256812,0.0014549154,0.002142515,0.0011808437,0.019142568],"category_scores_gemma":[0.004621893,0.0005067434,0.00045580204,0.000897215,0.0004517195,0.0018805598,0.0023624315,0.000961976,0.0066374806],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0031042374,0.0018143477,0.005974659,0.0015958875,0.00018791648,0.0030254314,0.0058196355,0.004193705,0.119688466,0.0066164327,0.16904514,0.6789341],"study_design_scores_gemma":[0.0012424662,0.0029187975,0.028281266,0.0007740939,0.00041574799,0.0036660305,0.00256454,0.35159376,0.10922121,0.0077008945,0.49080688,0.0008143363],"about_ca_topic_score_codex":0.001724574,"about_ca_topic_score_gemma":0.001046975,"teacher_disagreement_score":0.019142568,"about_ca_system_score_codex":0.00053190725,"about_ca_system_score_gemma":0.0010039796,"threshold_uncertainty_score":0.06403828},"labels":[],"label_agreement":null},{"id":"W2953985905","doi":"10.29173/mocs75","title":"Smart Construction Site: Ontology of Information System Architecture","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architecture; Ontology; Process (computing); Task (project management); Information system; Systems engineering; Software engineering; Engineering","score_opus":0.002756303758788829,"score_gpt":0.15644658311729176,"score_spread":0.15369027935850293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2953985905","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008185664,0.0010856044,0.8960459,0.0023052853,0.00023020295,0.00022563223,0.0004942391,0.00096534163,0.090462044],"genre_scores_gemma":[0.28653535,0.0035526939,0.6812277,0.0007800721,0.0002064816,0.0006813039,0.0018308233,0.00039182112,0.024793688],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99778396,0.00093295757,0.00023499105,0.00026448083,0.00057822705,0.00020537687],"domain_scores_gemma":[0.9987758,0.00040017714,0.00010246073,0.00032916985,0.0002726349,0.000119706856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026109782,0.0005301122,0.00062598946,0.0032421798,0.001717866,0.007788057,0.001400571,0.0019687882,0.0035772454],"category_scores_gemma":[0.0021930889,0.0005622427,0.0010358345,0.004123301,0.0045186104,0.010068434,0.0028365124,0.0024959405,0.0013531504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000058254172,0.00001716906,0.00027665496,0.000061320454,0.00001131133,0.00008246495,0.00093701726,0.0023077293,0.00057389,0.982242,0.0018695673,0.0116150845],"study_design_scores_gemma":[0.00001775093,0.000034137425,0.0008505983,0.0002771465,0.000033190092,0.0005446381,0.0015689632,0.030968066,0.0012123638,0.5869101,0.37753454,0.00004851333],"about_ca_topic_score_codex":0.007814173,"about_ca_topic_score_gemma":0.005719721,"teacher_disagreement_score":0.007814173,"about_ca_system_score_codex":0.002538031,"about_ca_system_score_gemma":0.004420602,"threshold_uncertainty_score":0.018414736},"labels":[],"label_agreement":null},{"id":"W2954089627","doi":"10.29173/mocs104","title":"An Efficiency-orientated Total Factor Productivity Measurement Model for Construction Projects","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Productivity; Risk analysis (engineering); Engineering; Computer science; Systems engineering; Manufacturing engineering; Business; Economics","score_opus":0.015141659327271514,"score_gpt":0.20590774227763148,"score_spread":0.19076608295035996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954089627","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.057214465,0.00015632286,0.9294662,0.00039320724,0.00003794554,0.00048023183,0.0006276217,0.00026330233,0.011360802],"genre_scores_gemma":[0.7844827,0.00033710795,0.20802605,0.000050511368,0.000019433533,0.0020632658,0.00058790145,0.000046921657,0.004386039],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99652594,0.0019556044,0.00019702723,0.00049172726,0.0005856572,0.00024391554],"domain_scores_gemma":[0.9961331,0.002274768,0.0005374013,0.00022581281,0.00072422915,0.00010458356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061895982,0.0013648863,0.0007456761,0.0024785849,0.00046551094,0.002452827,0.0025519247,0.0018712629,0.0044480124],"category_scores_gemma":[0.010341341,0.0006043769,0.0014556582,0.0035567705,0.0010068493,0.0025336165,0.0014226808,0.0013347714,0.00069735356],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041115298,0.00012324988,0.0025632093,0.00007013344,0.00003926618,0.000043520442,0.00010077952,0.9588356,0.00034088525,0.02321077,0.00036428985,0.01426719],"study_design_scores_gemma":[0.000014242542,0.0001131552,0.0009972987,0.000023240991,0.000019269937,0.000017085771,0.000084377076,0.98712313,0.00014486886,0.010407737,0.0010404959,0.000015082899],"about_ca_topic_score_codex":0.0085489005,"about_ca_topic_score_gemma":0.008142181,"teacher_disagreement_score":0.0085489005,"about_ca_system_score_codex":0.0030433033,"about_ca_system_score_gemma":0.002904182,"threshold_uncertainty_score":0.032734096},"labels":[],"label_agreement":null},{"id":"W2954092237","doi":"10.29173/mocs135","title":"Bridging the Gap between Academic and Practice Quantity Surveying in Nigerian Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Openness to experience; Bridging (networking); Bridge (graph theory); Curriculum; Body of knowledge; Knowledge management; Public relations; Medical education; Psychology; Sociology; Political science; Pedagogy; Computer science; Medicine; Social psychology","score_opus":0.01882426593830691,"score_gpt":0.2410966352264226,"score_spread":0.2222723692881157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954092237","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.985145,0.0010509474,0.0034835984,0.0025845845,0.000048255595,0.00012388555,0.000076159056,0.000010444229,0.007477021],"genre_scores_gemma":[0.99735874,0.00038224857,0.0011098424,0.00029079273,0.00001616971,0.00008575249,0.00003104334,0.000003881078,0.0007214579],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.978777,0.010706523,0.002386901,0.0012742169,0.005679271,0.0011761042],"domain_scores_gemma":[0.94710207,0.031516556,0.007802098,0.0021368575,0.009128652,0.002313722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018529901,0.00017677211,0.00034899067,0.0033961623,0.0018231049,0.002750289,0.0006625736,0.0006242546,0.002801641],"category_scores_gemma":[0.040845294,0.0003876551,0.00013549934,0.0035862,0.0021429628,0.002200738,0.002744333,0.00052392826,0.00029166523],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018902987,0.00042753565,0.6430628,0.0011678936,0.00002261549,0.0005904117,0.21796463,0.00034270895,0.0018993103,0.007348942,0.0017305412,0.12525359],"study_design_scores_gemma":[0.000018079732,0.00068456907,0.5497272,0.0014001507,0.00002167539,0.0009200917,0.4003754,0.0015422382,0.0010327707,0.0045086,0.039724268,0.000044918364],"about_ca_topic_score_codex":0.004826015,"about_ca_topic_score_gemma":0.007720473,"teacher_disagreement_score":0.018529901,"about_ca_system_score_codex":0.002192532,"about_ca_system_score_gemma":0.004873805,"threshold_uncertainty_score":0.09799671},"labels":[],"label_agreement":null},{"id":"W2954104000","doi":"10.22260/isarc2019/0095","title":"Ontology-Based Knowledge Modeling for Frame Assemblies Manufacturing","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Ontology; Computer science; Frame (networking); Modular design; Product (mathematics); Automation; Manufacturing engineering; Information model; Building information modeling; Process (computing); Download; Software engineering; Knowledge modeling; Engineering; World Wide Web; Domain knowledge; Operations management; Mechanical engineering","score_opus":0.012929366064684667,"score_gpt":0.21883262166325246,"score_spread":0.20590325559856779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954104000","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0061005335,0.00050297356,0.9830063,0.0005759843,0.000060502018,0.00031219318,0.00078289496,0.0007796717,0.00787895],"genre_scores_gemma":[0.13243684,0.001480459,0.8584538,0.00016024678,0.0000368997,0.0008277581,0.0026220614,0.00017627566,0.003805594],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99851936,0.0005537922,0.00020032577,0.00016837523,0.0004583688,0.000099701385],"domain_scores_gemma":[0.99898463,0.0005507039,0.000092468,0.000140181,0.0001749444,0.00005711454],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017174329,0.0008219014,0.0007443183,0.0027303682,0.0012774093,0.0036368088,0.0019573206,0.0015770542,0.003082376],"category_scores_gemma":[0.002977622,0.00074204523,0.0031857134,0.0024708186,0.0011814845,0.0033204674,0.0028813605,0.0018269568,0.00083346973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010423539,0.00030343185,0.0013713975,0.00056123495,0.0002480163,0.0010978031,0.001978272,0.39233893,0.005558399,0.46669406,0.007093606,0.122650705],"study_design_scores_gemma":[0.00003217811,0.000029359197,0.00042973435,0.00022944837,0.00010098873,0.00017875935,0.0003803532,0.84762686,0.0016665296,0.0995044,0.049773637,0.000047731275],"about_ca_topic_score_codex":0.035828583,"about_ca_topic_score_gemma":0.036143754,"teacher_disagreement_score":0.035828583,"about_ca_system_score_codex":0.0026956392,"about_ca_system_score_gemma":0.0037653977,"threshold_uncertainty_score":0.07124007},"labels":[],"label_agreement":null},{"id":"W2954113214","doi":"10.22260/isarc2019/0093","title":"Infographics on Unmanned Dozer Operation","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Infographic; Download; Computer science; Displacement (psychology); World Wide Web; Multimedia","score_opus":0.004343861119126034,"score_gpt":0.1732408418434384,"score_spread":0.16889698072431236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954113214","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028822575,0.02074929,0.13467084,0.009115098,0.0068981703,0.00018729329,0.0022658266,0.00554532,0.79174554],"genre_scores_gemma":[0.2937074,0.025547419,0.040174644,0.0012347248,0.0042128144,0.00013285856,0.003804415,0.0017276532,0.62945807],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99960095,0.000089724286,0.000018076891,0.00004210385,0.00021544007,0.00003369921],"domain_scores_gemma":[0.99922454,0.0002730085,0.000054781805,0.0001604737,0.00018077953,0.00010635065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049654517,0.0006793044,0.0002903274,0.0014847656,0.0007400837,0.0020589435,0.00046942063,0.00082244555,0.0909595],"category_scores_gemma":[0.0013187992,0.00017362226,0.000250423,0.0017108488,0.0013975878,0.002004363,0.0017874339,0.00071060297,0.009427273],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020089552,0.000053579926,0.0012784691,0.00075219845,0.000020842695,0.0008958773,0.004095301,0.00371011,0.009363401,0.05677971,0.35024536,0.5726042],"study_design_scores_gemma":[0.0000044193366,0.00004060626,0.0017482684,0.00021503729,0.00000823864,0.00029149395,0.00078880024,0.0014952413,0.001827228,0.0056487834,0.9879155,0.000016280195],"about_ca_topic_score_codex":0.0042321943,"about_ca_topic_score_gemma":0.006155153,"teacher_disagreement_score":0.0909595,"about_ca_system_score_codex":0.0010785809,"about_ca_system_score_gemma":0.0008123407,"threshold_uncertainty_score":0.30428982},"labels":[],"label_agreement":null},{"id":"W2954309327","doi":"10.29173/mocs108","title":"A Case Study for 3D Modeling Process Analysis based on BIM Log File","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Building information modeling; Framing (construction); Process (computing); Chart; Data file; Reading (process); Engineering drawing; Database; Software engineering; Programming language; Engineering","score_opus":0.010602408505400186,"score_gpt":0.21795297551684306,"score_spread":0.2073505670114429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954309327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6402692,0.0004191138,0.32323366,0.0012646856,0.00011002381,0.0010809045,0.0021701718,0.0016559705,0.029796343],"genre_scores_gemma":[0.82026756,0.00027670828,0.16801731,0.000079156394,0.000022335946,0.00043376585,0.001176653,0.00029798376,0.009428628],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974318,0.00090236636,0.00014648856,0.00028871853,0.0010300071,0.00020055159],"domain_scores_gemma":[0.9965945,0.0018999396,0.00017302636,0.00067610445,0.0004698666,0.0001866436],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024199686,0.0007252704,0.00045296462,0.0024925892,0.0019432609,0.0021026614,0.0016072631,0.0020547279,0.0051231114],"category_scores_gemma":[0.0038658346,0.00043535096,0.0010556037,0.0031250224,0.0012162392,0.0015717451,0.0012587557,0.0009833261,0.0012461892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012740645,0.0036752895,0.087776154,0.0020087853,0.00020442248,0.081111506,0.0488732,0.21837209,0.06752917,0.07764439,0.023662258,0.38786864],"study_design_scores_gemma":[0.00016993393,0.00105655,0.046664897,0.00045595187,0.00024548318,0.016076697,0.031291276,0.61503464,0.09112638,0.016834574,0.18067679,0.00036690716],"about_ca_topic_score_codex":0.008128795,"about_ca_topic_score_gemma":0.014340567,"teacher_disagreement_score":0.008128795,"about_ca_system_score_codex":0.0014249702,"about_ca_system_score_gemma":0.0017272226,"threshold_uncertainty_score":0.017138481},"labels":[],"label_agreement":null},{"id":"W2954311262","doi":"10.29173/mocs137","title":"Site-specific Modular Design Optimization for High-rise Residential Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Set (abstract data type); Genetic algorithm; Plan (archaeology); Computer science; Building design; Daylighting; Efficient energy use; Page layout; Reliability engineering; Engineering; Architectural engineering","score_opus":0.007363822194697756,"score_gpt":0.17986035166124598,"score_spread":0.17249652946654823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954311262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10252348,0.0003298002,0.885557,0.000054280594,0.000025883292,0.000083365085,0.00008385051,0.00037933284,0.010963084],"genre_scores_gemma":[0.7995012,0.00034306993,0.19565268,0.000029726447,0.000013634611,0.00017207031,0.00016693778,0.00012419221,0.003996425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973744,0.00008800742,0.000007548446,0.00004175975,0.00008940126,0.00003589446],"domain_scores_gemma":[0.99984837,0.000049055,0.000033166518,0.000020071036,0.000036588535,0.000012736226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045755273,0.0008558195,0.00054206146,0.0006042954,0.0002347879,0.00051627867,0.00058920233,0.00048486915,0.0022991823],"category_scores_gemma":[0.0005855051,0.00032577265,0.00087865,0.0005455098,0.0003285617,0.0003823739,0.00060023856,0.00042096668,0.0003977726],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016039798,0.000018531213,0.00034483869,0.000044191784,0.000011781132,0.000051544364,0.000014596007,0.97933793,0.0059923236,0.001523215,0.00018916298,0.01245599],"study_design_scores_gemma":[0.000008408235,0.000093502385,0.0006104871,0.000006570886,0.000015676162,0.000045037064,0.000020168116,0.99428815,0.0023773743,0.0012937374,0.0012343298,0.000006534628],"about_ca_topic_score_codex":0.0010958251,"about_ca_topic_score_gemma":0.00217909,"teacher_disagreement_score":0.0022991823,"about_ca_system_score_codex":0.00048704815,"about_ca_system_score_gemma":0.00051317003,"threshold_uncertainty_score":0.007691562},"labels":[],"label_agreement":null},{"id":"W2954585279","doi":"10.22260/isarc2019/0018","title":"Multi-objective Optimization Analysis for Selective Disassembly Planning of Buildings","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.009301348081987248,"score_gpt":0.2259789398981037,"score_spread":0.21667759181611645,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954585279","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04211262,0.0006949566,0.9482997,0.00021914292,0.00003150899,0.0001537766,0.0001067221,0.00009712082,0.008284368],"genre_scores_gemma":[0.74005824,0.0010586401,0.24878691,0.00010134939,0.00003768218,0.0007411957,0.00034951887,0.00015714945,0.008709394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943906,0.00023589886,0.000022033792,0.00006511982,0.00016639952,0.00007141019],"domain_scores_gemma":[0.99902296,0.00069606083,0.00007596483,0.00001878926,0.0001544682,0.00003173082],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017163124,0.0014890934,0.0009526532,0.0011625638,0.00047628427,0.0013958013,0.0005902934,0.0007853946,0.0029922056],"category_scores_gemma":[0.0020202422,0.0007291464,0.0015219447,0.00086076657,0.00059485063,0.00070744444,0.0009975572,0.0010893823,0.0002860157],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009441013,0.0000116220845,0.00014088262,0.000029981513,0.00001391698,0.000014805791,0.000011551189,0.99436814,0.00031303306,0.0011098288,0.00010657221,0.0038701734],"study_design_scores_gemma":[0.000002197872,0.000019161564,0.00012639338,0.000007527041,0.0000070387864,0.000003246275,0.00001209284,0.99856865,0.0001874197,0.0007826086,0.00028059492,0.0000029362461],"about_ca_topic_score_codex":0.010034742,"about_ca_topic_score_gemma":0.007326412,"teacher_disagreement_score":0.010034742,"about_ca_system_score_codex":0.0014696592,"about_ca_system_score_gemma":0.0016088668,"threshold_uncertainty_score":0.019952655},"labels":[],"label_agreement":null},{"id":"W2954660414","doi":"10.29173/mocs102","title":"Logistics Strategy for Industrialised House Building","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Government","keywords":"Supply chain; Flexibility (engineering); Product (mathematics); Process management; Integrated logistics support; Business; Standardization; Order (exchange); Process (computing); Usability; Modularity (biology); Computer science; Manufacturing engineering; Marketing; Engineering; Economics","score_opus":0.017378192125625427,"score_gpt":0.21797561409648544,"score_spread":0.20059742197086,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954660414","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.32076398,0.001787097,0.011047234,0.008598738,0.000078307254,0.00018821031,0.00010342129,0.00007285075,0.6573602],"genre_scores_gemma":[0.923896,0.0009415881,0.0025056365,0.00043212174,0.0000147666215,0.000052425064,0.00009466247,0.000013191963,0.07204956],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994666,0.0001750248,0.000022918313,0.000052696814,0.00009267209,0.00019007824],"domain_scores_gemma":[0.999798,0.00004589476,0.000034452652,0.000012921149,0.000052771327,0.000055995282],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005459748,0.0002410923,0.00010495771,0.001118981,0.0017000175,0.0064062155,0.000511525,0.0013856111,0.011719886],"category_scores_gemma":[0.00062746875,0.00013978862,0.0002881212,0.0012474004,0.0017656242,0.0017816824,0.002712491,0.0007261321,0.000874954],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022789593,0.00005169033,0.0018929143,0.000077773446,0.0000073168876,0.0011816903,0.004274178,0.0034874645,0.00073652336,0.96574515,0.0024350733,0.020087436],"study_design_scores_gemma":[0.00007019218,0.00033036328,0.016774802,0.00064435473,0.00004017466,0.0014017287,0.06594084,0.012922983,0.0038484307,0.20656338,0.69135743,0.000105369945],"about_ca_topic_score_codex":0.014704208,"about_ca_topic_score_gemma":0.0260801,"teacher_disagreement_score":0.014704208,"about_ca_system_score_codex":0.008324635,"about_ca_system_score_gemma":0.004648793,"threshold_uncertainty_score":0.06039977},"labels":[],"label_agreement":null},{"id":"W2954735062","doi":"10.29173/mocs98","title":"Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence.","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"University of Technology Sydney","keywords":"Productivity; Construction industry; Process (computing); Building industry; Engineering; Operations management; Business; Environmental resource management; Architectural engineering; Computer science; Environmental science; Construction engineering; Economics","score_opus":0.005849767701162874,"score_gpt":0.1888075885468773,"score_spread":0.1829578208457144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954735062","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8762328,0.051267955,0.008623854,0.0010226592,0.00016031522,0.00027767828,0.0012755817,0.00008664769,0.0610524],"genre_scores_gemma":[0.97520214,0.015162104,0.0032641976,0.000096941585,0.000034244888,0.00006220328,0.0003647577,0.000027280803,0.0057860906],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99839264,0.00030020307,0.00008811026,0.00016484837,0.0009421832,0.000112106994],"domain_scores_gemma":[0.99691004,0.0010041271,0.0011397252,0.000122052894,0.00070416735,0.00011997296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00172574,0.00030484746,0.00025191423,0.0014171468,0.00033476047,0.0016987644,0.00062044006,0.0003218195,0.0031712174],"category_scores_gemma":[0.0041562063,0.00016762508,0.00035680615,0.0017625056,0.00061724597,0.00085080846,0.00084555434,0.00034867605,0.0005712561],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024579777,0.00023860144,0.10925741,0.011230633,0.00022266436,0.0015085138,0.005643356,0.0018554666,0.041871496,0.004874737,0.0029806714,0.8200706],"study_design_scores_gemma":[0.000010439184,0.0013859301,0.8964198,0.002167326,0.00028909417,0.0020732584,0.011583276,0.00068755174,0.022161314,0.002561908,0.06060668,0.000053526845],"about_ca_topic_score_codex":0.003453433,"about_ca_topic_score_gemma":0.011261942,"teacher_disagreement_score":0.003453433,"about_ca_system_score_codex":0.0010648125,"about_ca_system_score_gemma":0.0012436073,"threshold_uncertainty_score":0.010608733},"labels":[],"label_agreement":null},{"id":"W2954838440","doi":"10.22260/isarc2019/0081","title":"Development of the Simulator for Carrying a Lifted Load in Large Plant Construction","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Animation; Computer science; Virtual reality; Simulation; Work (physics); Physics engine; Computer graphics (images); Human–computer interaction; Engineering; Mechanical engineering","score_opus":0.007546639378918208,"score_gpt":0.1931979601850155,"score_spread":0.1856513208060973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954838440","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06422826,0.00028047172,0.91299766,0.00027000526,0.00026322264,0.001475317,0.00087427406,0.009258927,0.010351845],"genre_scores_gemma":[0.35586798,0.00078007695,0.6252734,0.00013360819,0.000051849234,0.0018410677,0.0020971603,0.0007575298,0.013197403],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999608,0.000085043226,0.000032179825,0.00004402372,0.00019751977,0.000033207023],"domain_scores_gemma":[0.99939287,0.00018198323,0.000028709312,0.00008940165,0.00021768911,0.00008931286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073487574,0.00089856377,0.00048697554,0.00067441736,0.00030623435,0.0007012041,0.0018892814,0.0009075692,0.008967071],"category_scores_gemma":[0.0014857705,0.0004976087,0.000809862,0.00033031328,0.0003529877,0.0008286242,0.001479671,0.00074174476,0.0020835963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007612251,0.0010319117,0.0129236225,0.0020270734,0.00023539705,0.0024627123,0.003333712,0.21307309,0.29382187,0.010763473,0.022341162,0.43722475],"study_design_scores_gemma":[0.00028191958,0.0012064135,0.0079127615,0.0002922662,0.00020356744,0.0012550453,0.00061672396,0.80688715,0.07847658,0.0023491427,0.10025129,0.0002671891],"about_ca_topic_score_codex":0.002448676,"about_ca_topic_score_gemma":0.0022238789,"teacher_disagreement_score":0.008967071,"about_ca_system_score_codex":0.00030308694,"about_ca_system_score_gemma":0.0013856879,"threshold_uncertainty_score":0.029997826},"labels":[],"label_agreement":null},{"id":"W2954867402","doi":"10.22260/isarc2019/0148","title":"Implementing Collaborative Learning Platforms in Construction Management Education","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Class (philosophy); Engineering management; Project management; Construction management; Knowledge management; Computer science; Engineering; Systems engineering; Operations management","score_opus":0.0029069471526231355,"score_gpt":0.19495141145767103,"score_spread":0.1920444643050479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954867402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.537748,0.0017264518,0.23376635,0.01100095,0.00083888834,0.0021959683,0.00016284049,0.00468825,0.20787233],"genre_scores_gemma":[0.7897895,0.0010446553,0.18658772,0.00052466633,0.00014406009,0.001104713,0.0002207863,0.00020603191,0.020377869],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9947944,0.0026141976,0.000191472,0.00037295252,0.0011756548,0.0008511641],"domain_scores_gemma":[0.9923294,0.0032612947,0.0005017074,0.0008209241,0.0009122383,0.0021743644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0060186186,0.0004688987,0.00030461504,0.0011197985,0.0017294515,0.0049257185,0.0018097182,0.0018362795,0.011772338],"category_scores_gemma":[0.009149257,0.0003434542,0.00048733773,0.00090938556,0.00084980944,0.005320741,0.0099543445,0.0015232625,0.0041131782],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020668702,0.007225057,0.005960343,0.0005571321,0.000032275893,0.00043024102,0.0054294257,0.0048980564,0.0047273315,0.019002048,0.016121145,0.9354103],"study_design_scores_gemma":[0.001015509,0.010625113,0.036785424,0.005165881,0.00021901322,0.0016642552,0.036456194,0.0871989,0.042302594,0.097906716,0.6802213,0.0004391434],"about_ca_topic_score_codex":0.00065763015,"about_ca_topic_score_gemma":0.00093779515,"teacher_disagreement_score":0.011772338,"about_ca_system_score_codex":0.0011887691,"about_ca_system_score_gemma":0.0039487346,"threshold_uncertainty_score":0.039382398},"labels":[],"label_agreement":null},{"id":"W2954892287","doi":"10.29173/mocs119","title":"Strategies for a Safe Integration of Water-Bearing MEP Systems in Prefabricated CLT Room Modules","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Österreichische Forschungsförderungsgesellschaft","keywords":"Prefabrication; Piping; Modular design; Engineering; Bearing (navigation); Routing (electronic design automation); Architectural engineering; Civil engineering; Construction engineering; Computer science; Mechanical engineering; Embedded system","score_opus":0.009056262430301934,"score_gpt":0.19679581105613472,"score_spread":0.18773954862583278,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954892287","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5704068,0.00086250325,0.42343134,0.00013946852,0.000038129332,0.0002569626,0.00009837216,0.0012522449,0.0035141485],"genre_scores_gemma":[0.87774426,0.0002831874,0.11977517,0.000022923277,0.000012228896,0.00009633984,0.00013264136,0.00007057521,0.00186258],"study_design_codex":"bench_or_experimental","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992743,0.00015611813,0.00004326694,0.00008381078,0.0003078973,0.00013461213],"domain_scores_gemma":[0.9993994,0.00008427784,0.00019778615,0.000121701996,0.0001556392,0.000041263138],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007070346,0.00057251955,0.00035612783,0.00077133544,0.000261752,0.00049940124,0.000792142,0.0004042363,0.0012756281],"category_scores_gemma":[0.00093475677,0.00025447962,0.00040062598,0.00039194632,0.00031464457,0.0005812473,0.0006969513,0.00033613306,0.00063012395],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028579295,0.0002666219,0.012683789,0.0005868883,0.000037594265,0.0007564355,0.0005445408,0.045899544,0.7112089,0.0020365643,0.0007136499,0.2249797],"study_design_scores_gemma":[0.00009488779,0.0044531883,0.07460668,0.0001871425,0.00016856605,0.0025646326,0.0010556882,0.101991676,0.77925104,0.0019438812,0.033566255,0.00011635445],"about_ca_topic_score_codex":0.0004898522,"about_ca_topic_score_gemma":0.000850323,"teacher_disagreement_score":0.0012756281,"about_ca_system_score_codex":0.00023062387,"about_ca_system_score_gemma":0.0004521081,"threshold_uncertainty_score":0.0042673945},"labels":[],"label_agreement":null},{"id":"W2954896328","doi":"10.29173/mocs82","title":"A Knowledge-Based Approach Towards Automated Manufacturing-Centric BIM: Wood Frame Design and Modelling for Light-Frame Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Framing (construction); Modular design; Frame (networking); Field (mathematics); Engineering; Modular construction; Construction engineering; Systems engineering; Construction industry; Computer science; Context (archaeology); Architectural engineering; Best practice; Software engineering; Civil engineering; Compatibility (geochemistry); Mechanical engineering","score_opus":0.011602531409594576,"score_gpt":0.2007306233714876,"score_spread":0.189128091961893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954896328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023357107,0.000042161955,0.99363893,0.00009407097,0.000007702546,0.000100403115,0.00009978873,0.00083856384,0.0028427613],"genre_scores_gemma":[0.048398327,0.00016217875,0.94894236,0.000056667708,0.0000078764615,0.0002073133,0.0004959242,0.00013715908,0.0015921395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99789315,0.00057190424,0.00020387614,0.00044845697,0.0007703802,0.00011224503],"domain_scores_gemma":[0.9984982,0.00059857336,0.0001335613,0.0004209992,0.00028339666,0.00006531731],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020980013,0.0010975813,0.0008836906,0.0026985533,0.001222847,0.0052690962,0.0035832142,0.002064177,0.004069925],"category_scores_gemma":[0.004526564,0.0011292025,0.0018464167,0.0020547495,0.0016937677,0.0029423062,0.0034649363,0.0016949235,0.0015105782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010507962,0.00044460807,0.0017239549,0.00062036695,0.00011279204,0.0010476608,0.0036485442,0.48572,0.018154893,0.120698184,0.0054183854,0.36230552],"study_design_scores_gemma":[0.000026865428,0.000049261576,0.0006885842,0.00017837167,0.000052730687,0.0003323235,0.00064146717,0.9028514,0.010410026,0.048299827,0.036402017,0.00006714362],"about_ca_topic_score_codex":0.012997751,"about_ca_topic_score_gemma":0.019522497,"teacher_disagreement_score":0.012997751,"about_ca_system_score_codex":0.0021148156,"about_ca_system_score_gemma":0.002949571,"threshold_uncertainty_score":0.025844157},"labels":[],"label_agreement":null},{"id":"W2954899194","doi":"10.29173/mocs79","title":"Applying Virtual Reality to Improve the Construction Logistics of High-rise Modular Integrated Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Process (computing); Plan (archaeology); Virtual reality; Construction management; Modular construction; Construction engineering; Unit (ring theory); Engineering; Computer science; Architectural engineering; Transport engineering; Engineering management; Operations research; Operations management; Civil engineering; Artificial intelligence","score_opus":0.007034569385863198,"score_gpt":0.1939025671253843,"score_spread":0.18686799773952112,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2954899194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18847401,0.00040700263,0.79778844,0.00031302814,0.00008850583,0.00012055438,0.00006665631,0.0011115309,0.011630362],"genre_scores_gemma":[0.87699014,0.0004927927,0.12029887,0.000062293075,0.000012572339,0.00005825817,0.0000858504,0.00005827367,0.00194104],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994999,0.00019909375,0.000025341493,0.0000554052,0.00014094183,0.00007920466],"domain_scores_gemma":[0.9994804,0.00021025795,0.00008556984,0.00006826545,0.000115182294,0.000040321152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066658476,0.0008563261,0.0005397,0.0008881349,0.0004071584,0.0019074731,0.00081540865,0.00089167967,0.0020159916],"category_scores_gemma":[0.0019521576,0.00046004774,0.0010466485,0.0006843109,0.0004494191,0.0015558648,0.0013911097,0.00054350466,0.0003660701],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010732632,0.000171428,0.0019880175,0.00010651975,0.00003035743,0.00026170004,0.0003190507,0.9350874,0.008559923,0.0031243558,0.0004498828,0.049794044],"study_design_scores_gemma":[0.000015107064,0.00017066393,0.0012098128,0.000018677305,0.000033881603,0.00006377026,0.00018435017,0.9930675,0.0028654516,0.00087175414,0.0014686252,0.000030470052],"about_ca_topic_score_codex":0.007583343,"about_ca_topic_score_gemma":0.0064824377,"teacher_disagreement_score":0.007583343,"about_ca_system_score_codex":0.0006216846,"about_ca_system_score_gemma":0.0011314184,"threshold_uncertainty_score":0.015078425},"labels":[],"label_agreement":null},{"id":"W2955074025","doi":"10.29173/mocs109","title":"Assessing the Environmental Implications of Industrialized Housing: a Systematic Literature Review","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Environmental impact assessment; Prefabrication; Life-cycle assessment; Process (computing); Systematic review; Engineering; Business; Risk analysis (engineering); Architectural engineering; Operations management; Computer science; Civil engineering; Production (economics); Economics; Political science","score_opus":0.0095084233190437,"score_gpt":0.21796512665666148,"score_spread":0.2084567033376178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955074025","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025967418,0.9949704,0.0003456308,0.00043584438,0.00010086291,0.00027295886,0.0005133673,0.000008032758,0.00075624615],"genre_scores_gemma":[0.011684815,0.9864379,0.00082269375,0.00032810555,0.00004396808,0.0002812239,0.00027533618,0.0000039038036,0.00012199248],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9942472,0.001799917,0.0017585742,0.00054228806,0.0014432854,0.00020874792],"domain_scores_gemma":[0.97424763,0.019121708,0.0033349844,0.00034080644,0.0026798015,0.0002751131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006969318,0.0012742748,0.0032004123,0.020372016,0.00075461634,0.0029035222,0.0016454206,0.0017011509,0.0038089606],"category_scores_gemma":[0.025365675,0.000891904,0.0038642061,0.017642241,0.001040259,0.0032974228,0.0019348927,0.0009817824,0.00035917773],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058085236,0.000037101338,0.0014723205,0.8928749,0.0016866078,0.00036741977,0.00091340166,0.0002385322,0.0002647378,0.001089399,0.0027093785,0.09828821],"study_design_scores_gemma":[0.000027763697,0.00013070297,0.0049681086,0.9348249,0.00971727,0.00056212005,0.0018061455,0.00010317404,0.00022085271,0.0006109418,0.046988267,0.000039754494],"about_ca_topic_score_codex":0.009095418,"about_ca_topic_score_gemma":0.029560518,"teacher_disagreement_score":0.020372016,"about_ca_system_score_codex":0.0037203566,"about_ca_system_score_gemma":0.017598428,"threshold_uncertainty_score":0.036857724},"labels":[],"label_agreement":null},{"id":"W2955122893","doi":"10.22260/isarc2019/0079","title":"Information Exchange Process for AR based Smart Facility Maintenance System Using BIM Model","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Data exchange; Computer science; Information system; Process (computing); Information exchange; Information model; Systems engineering; Augmented reality; Field (mathematics); Software engineering; Database; Engineering; Human–computer interaction; Operating system","score_opus":0.015807402177863698,"score_gpt":0.20862227696018873,"score_spread":0.19281487478232504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955122893","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06935987,0.00042487725,0.8944151,0.0007188882,0.00011885175,0.0006472348,0.00038705347,0.0042641656,0.029664014],"genre_scores_gemma":[0.73259586,0.0005519827,0.25141186,0.00016230484,0.000051203595,0.0004417195,0.0015593251,0.00024558374,0.012980226],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9971215,0.0007716323,0.00027004458,0.000342519,0.0012477105,0.00024647728],"domain_scores_gemma":[0.9985453,0.0005040344,0.00015581658,0.00031820367,0.0004033827,0.000073258416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023115154,0.00070760556,0.0005949178,0.0021524122,0.001191781,0.002791467,0.0012361424,0.001042442,0.0063375947],"category_scores_gemma":[0.003509822,0.0005167348,0.001219184,0.0014653913,0.00052167184,0.0034591388,0.002127635,0.0008040851,0.0015582066],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001009154,0.0008911948,0.016737942,0.0006681036,0.00016593143,0.0027958092,0.007509692,0.23426723,0.041878387,0.09225732,0.018087126,0.5837321],"study_design_scores_gemma":[0.000100817575,0.000291185,0.004502782,0.00011453811,0.0001347769,0.0005817934,0.0011509354,0.9059166,0.031479735,0.012742567,0.042830568,0.00015378505],"about_ca_topic_score_codex":0.0046591195,"about_ca_topic_score_gemma":0.002084462,"teacher_disagreement_score":0.0063375947,"about_ca_system_score_codex":0.0008880333,"about_ca_system_score_gemma":0.0014132479,"threshold_uncertainty_score":0.021201313},"labels":[],"label_agreement":null},{"id":"W2955171787","doi":"10.29173/mocs92","title":"The Value Proposition of RFID Technology in Tall Prefabricated Timber Buildings","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Radio-frequency identification; Supply chain; Factory (object-oriented programming); Value proposition; Architectural engineering; Production (economics); Investment (military); Order (exchange); Engineering; Computer science; Operations management; Manufacturing engineering; Systems engineering; Business; Civil engineering; Computer security; Marketing","score_opus":0.002543184224073203,"score_gpt":0.17191218858594248,"score_spread":0.16936900436186927,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955171787","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9550818,0.00070232456,0.010364324,0.0007975216,0.00001229522,0.00015148937,0.000034092373,0.000008200699,0.032847814],"genre_scores_gemma":[0.99715745,0.00016807919,0.0021035422,0.000025182622,0.0000027642657,0.000023870185,0.000006775659,6.523303e-7,0.0005117185],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9963058,0.0024554562,0.00006934471,0.00015170593,0.0007880889,0.00022968708],"domain_scores_gemma":[0.98543996,0.01192831,0.0011975943,0.000394413,0.00071674393,0.00032291826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052193706,0.00027381536,0.00025581,0.0008326137,0.0009364987,0.003259297,0.0006123033,0.0010416544,0.0025353078],"category_scores_gemma":[0.010431601,0.00024832287,0.00022639983,0.00092777953,0.0030303667,0.003454571,0.0015581835,0.0009395208,0.00017720819],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022125163,0.0016643789,0.08288285,0.001504046,0.00012925008,0.0039433376,0.024500059,0.060622726,0.030465962,0.36857313,0.0012304552,0.42227122],"study_design_scores_gemma":[0.00026551363,0.011669745,0.24517892,0.004327714,0.0004081281,0.0025291347,0.1264748,0.13256845,0.046504356,0.38390824,0.04567093,0.0004940463],"about_ca_topic_score_codex":0.001386456,"about_ca_topic_score_gemma":0.0032269058,"teacher_disagreement_score":0.0052193706,"about_ca_system_score_codex":0.0026635714,"about_ca_system_score_gemma":0.0017712666,"threshold_uncertainty_score":0.02760297},"labels":[],"label_agreement":null},{"id":"W2955214881","doi":"10.29173/mocs113","title":"Research Trends in Off-Site Construction Management: Review of Literature at the Process Level","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Quality (philosophy); Process (computing); Excellence; Standardization; Process management; Project management; Engineering management; Business; Engineering; Operations management; Computer science; Systems engineering; Political science","score_opus":0.014465674163967854,"score_gpt":0.25808642755039835,"score_spread":0.2436207533864305,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955214881","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00081610173,0.99661356,0.00015989356,0.0011470802,0.00015321381,0.0000076026326,0.000040522304,0.000005372443,0.0010566923],"genre_scores_gemma":[0.0044511794,0.9941591,0.00036329363,0.00054690347,0.00023953986,0.000013477028,0.00006480008,0.0000048285533,0.00015686323],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99590576,0.0011032972,0.0009794286,0.0006463952,0.0011404065,0.00022465861],"domain_scores_gemma":[0.95441574,0.034244932,0.004321712,0.0004575645,0.0058469805,0.0007130057],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0064364797,0.0008872827,0.0014123282,0.020245746,0.0007988887,0.0046404144,0.0014751492,0.0022728767,0.003955321],"category_scores_gemma":[0.019174716,0.000801577,0.0014040767,0.026124572,0.0016554703,0.00669352,0.0013722623,0.0017835185,0.0008938378],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012722315,0.00014091453,0.0047756573,0.2000971,0.00034774258,0.00055164355,0.0038018255,0.00051167305,0.0008439019,0.011112884,0.02334894,0.75434047],"study_design_scores_gemma":[0.00002537771,0.00020811494,0.022501176,0.28668672,0.0012122341,0.001933754,0.007571787,0.00035433364,0.00061697984,0.0059905592,0.67279947,0.00009944449],"about_ca_topic_score_codex":0.005875632,"about_ca_topic_score_gemma":0.009373032,"teacher_disagreement_score":0.97975427,"about_ca_system_score_codex":0.0027610022,"about_ca_system_score_gemma":0.00932585,"threshold_uncertainty_score":0.034039795},"labels":[],"label_agreement":null},{"id":"W2955275722","doi":"10.1016/j.jclepro.2019.07.055","title":"Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings","year":2019,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":106,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Construction waste; Engineering; Building information modeling; Roof; Construction engineering; Construction industry; Sustainable design; Automation; Civil engineering; Sustainability; Architectural engineering; Waste management; Mechanical engineering; Operations management","score_opus":0.011622136090368464,"score_gpt":0.22257785405279532,"score_spread":0.21095571796242685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955275722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18474607,0.0003150712,0.7934476,0.00030008386,0.00003382242,0.00024246979,0.0005903111,0.0017677854,0.018556813],"genre_scores_gemma":[0.69660074,0.0002478358,0.2998326,0.000021250284,0.000004893274,0.00009682969,0.00057592726,0.00017924311,0.0024406642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992483,0.00020198307,0.000029791596,0.00007367192,0.00032992568,0.000116278854],"domain_scores_gemma":[0.9996369,0.000078895326,0.00004044378,0.000071573995,0.00013066287,0.00004158729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008547796,0.0008554649,0.0005566446,0.0011193906,0.00059490924,0.002251255,0.0010486955,0.0011020032,0.004174597],"category_scores_gemma":[0.0011941121,0.000788896,0.0007875597,0.0010225149,0.00065841817,0.0011916874,0.0018462832,0.0007181588,0.0011503481],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104045714,0.00017136642,0.0069237137,0.00019764563,0.00003530109,0.0002680766,0.000597444,0.8343439,0.019860914,0.009833406,0.0015057389,0.12615839],"study_design_scores_gemma":[0.000011327963,0.000106295214,0.004599615,0.000057303536,0.000023835146,0.00010134619,0.00048366142,0.9702828,0.009114931,0.0066243894,0.008545046,0.000049452425],"about_ca_topic_score_codex":0.007955693,"about_ca_topic_score_gemma":0.018956825,"teacher_disagreement_score":0.007955693,"about_ca_system_score_codex":0.0010440119,"about_ca_system_score_gemma":0.002422151,"threshold_uncertainty_score":0.015818775},"labels":[],"label_agreement":null},{"id":"W2955276466","doi":"10.29173/mocs73","title":"Data Analytics of Production Cycle Time for Offsite Construction Projects","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Productivity; Context (archaeology); Production (economics); Work (physics); Duration (music); Process (computing); Factory (object-oriented programming); Product (mathematics); Analytics; Computer science; Operations research; Engineering","score_opus":0.01515735602452109,"score_gpt":0.21053213920151176,"score_spread":0.19537478317699067,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955276466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8751442,0.00035511237,0.032280482,0.0002139084,0.00005190652,0.00028164426,0.07961617,0.0028361685,0.009220345],"genre_scores_gemma":[0.9159566,0.0002737578,0.030140454,0.00002002485,0.000015831085,0.0002610539,0.050056864,0.00013429948,0.0031412104],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99922824,0.00005660038,0.00006535653,0.00018073936,0.00040180355,0.00006725385],"domain_scores_gemma":[0.9973207,0.0008221925,0.0004816168,0.00027933333,0.00095748383,0.00013864553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007540297,0.0005972972,0.00033416515,0.0049156738,0.00028251443,0.0007652937,0.0005222659,0.0003355735,0.0022592184],"category_scores_gemma":[0.0032811938,0.00020728892,0.00042570152,0.0054158852,0.00016379703,0.00040895553,0.00031094917,0.00044233463,0.0009808658],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009614142,0.0006788616,0.53086144,0.0009144708,0.00014337631,0.0007144382,0.0018521108,0.087994665,0.01905005,0.0025812904,0.013917782,0.34033012],"study_design_scores_gemma":[0.00003418495,0.0003896781,0.7103535,0.00011936648,0.00006913523,0.0003566736,0.0016980947,0.23912023,0.017428832,0.0014016483,0.028936641,0.000091949696],"about_ca_topic_score_codex":0.036873426,"about_ca_topic_score_gemma":0.05108342,"teacher_disagreement_score":0.036873426,"about_ca_system_score_codex":0.0010467586,"about_ca_system_score_gemma":0.0012661013,"threshold_uncertainty_score":0.07331759},"labels":[],"label_agreement":null},{"id":"W2955324818","doi":"10.29173/mocs132","title":"Investigating Stakeholders' Perceptions of Feasibility and Implications of Modular Construction-Based Post-Disaster Reconstruction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Process (computing); Modular design; Natural disaster; Flooding (psychology); Emergency management; Construction engineering; Engineering; Civil engineering; Risk analysis (engineering); Forensic engineering; Architectural engineering; Business; Computer science; Geography; Political science","score_opus":0.018344549640802527,"score_gpt":0.2115309248818566,"score_spread":0.19318637524105406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955324818","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98725116,0.00014383087,0.0023099417,0.0013692768,0.000021420406,0.00011068597,0.000021836284,0.000010760066,0.0087610055],"genre_scores_gemma":[0.99801445,0.00017193923,0.0011157203,0.000106483945,0.000002834885,0.00003725798,0.000012329797,0.0000034903949,0.0005353473],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9925269,0.004835662,0.0002611772,0.00022595048,0.0010597659,0.0010905926],"domain_scores_gemma":[0.9902879,0.0049687303,0.001301924,0.0003365981,0.0017366132,0.001368276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0103145875,0.00033359285,0.00019586789,0.0007116724,0.002038338,0.0020256995,0.0008111336,0.0013079958,0.003444172],"category_scores_gemma":[0.018189514,0.00026702468,0.00040237416,0.00046154822,0.0022287322,0.0021185472,0.002655944,0.0011714972,0.0003167765],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005489468,0.0013816574,0.20062394,0.002046687,0.000091867136,0.0069478406,0.59548426,0.0041406755,0.023422122,0.016419314,0.005270151,0.14362259],"study_design_scores_gemma":[0.000031888496,0.0010706409,0.076256245,0.0006708306,0.000048868216,0.0008191495,0.8814024,0.003592186,0.0024062553,0.0021465688,0.03146852,0.000086518725],"about_ca_topic_score_codex":0.002447286,"about_ca_topic_score_gemma":0.0044530914,"teacher_disagreement_score":0.0103145875,"about_ca_system_score_codex":0.0016309167,"about_ca_system_score_gemma":0.002414971,"threshold_uncertainty_score":0.054549396},"labels":[],"label_agreement":null},{"id":"W2955374397","doi":"10.29173/mocs100","title":"The Legacies of Manufacturing and Factories of Industrialised Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Australian Government","keywords":"Automotive industry; Factory (object-oriented programming); Vision; Engineering; Production (economics); Manufacturing; Outsourcing; Business; Manufacturing engineering; Industrial organization; Marketing; Computer science; Economics; Sociology","score_opus":0.0058411985311016025,"score_gpt":0.17355343397249917,"score_spread":0.16771223544139757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955374397","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.122506626,0.028504977,0.034290075,0.05551766,0.00094185834,0.000083167506,0.000166413,0.00015361872,0.75783557],"genre_scores_gemma":[0.9406059,0.008465658,0.006774732,0.003975554,0.00025416535,0.00007242601,0.00007181265,0.00009245334,0.039687276],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99708086,0.001267635,0.00010768928,0.00060253125,0.00053062814,0.0004106869],"domain_scores_gemma":[0.99889237,0.0005035914,0.00015624131,0.00020718637,0.00012358645,0.000116990996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022927108,0.00043038782,0.0002790257,0.001415012,0.005161097,0.010243123,0.0006710421,0.0026569194,0.007599645],"category_scores_gemma":[0.0027417764,0.0003912922,0.00027544607,0.0021867235,0.032597013,0.00790504,0.0043859915,0.004220932,0.00094952417],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026041265,0.000011932797,0.00068247254,0.000051875646,0.0000037786556,0.00013671532,0.011032083,0.0002568213,0.0001274796,0.9697362,0.0024204105,0.015514157],"study_design_scores_gemma":[0.000016659487,0.000082994535,0.005324835,0.0004364986,0.000009638224,0.0007263244,0.015842551,0.00042943796,0.0003686506,0.42672768,0.5499927,0.000042026222],"about_ca_topic_score_codex":0.00685804,"about_ca_topic_score_gemma":0.009400712,"teacher_disagreement_score":0.010243123,"about_ca_system_score_codex":0.0071405745,"about_ca_system_score_gemma":0.002687753,"threshold_uncertainty_score":0.051808774},"labels":[],"label_agreement":null},{"id":"W2955398845","doi":"10.22260/isarc2019/0025","title":"An Analysis of the Problems of BIM-Based Drawings and Implementation During the Construction Document Phase","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Phase (matter); Engineering drawing; Engineering","score_opus":0.0037889256023634875,"score_gpt":0.2280575762540272,"score_spread":0.2242686506516637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955398845","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8104214,0.002134406,0.12634948,0.0036199805,0.00015031894,0.0021489004,0.00027110125,0.00038352938,0.05452088],"genre_scores_gemma":[0.91017854,0.0015428539,0.07693986,0.00019282705,0.00003559744,0.00078368466,0.00035477383,0.00023632312,0.00973555],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9136428,0.041064497,0.0059342934,0.0025721036,0.034031954,0.0027543178],"domain_scores_gemma":[0.80478376,0.10782419,0.022979772,0.011519488,0.051315207,0.0015776635],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.042106226,0.0010002475,0.00058644055,0.0081809275,0.00414385,0.009597801,0.0036165614,0.0026251152,0.0034618373],"category_scores_gemma":[0.14000244,0.0017661074,0.0009800858,0.01079956,0.0037449722,0.008778474,0.0033884498,0.002694911,0.0008695932],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006961718,0.0011110767,0.09223135,0.002234174,0.0001291983,0.0041115363,0.15437992,0.020680841,0.0096255075,0.05566443,0.008442825,0.65069294],"study_design_scores_gemma":[0.00013409331,0.0012594186,0.2420612,0.0044439156,0.0005430043,0.007468575,0.38754946,0.10682007,0.035841804,0.01613783,0.19703452,0.00070610305],"about_ca_topic_score_codex":0.008660181,"about_ca_topic_score_gemma":0.0077704308,"teacher_disagreement_score":0.042106226,"about_ca_system_score_codex":0.00891764,"about_ca_system_score_gemma":0.009147364,"threshold_uncertainty_score":0.22268164},"labels":[],"label_agreement":null},{"id":"W2955466431","doi":"10.29173/mocs112","title":"Data Analytics Application for Non-Conformance Reports in a Cabinet Manufacturing Facility","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Rework; Analytics; Computer science; Product (mathematics); Factory (object-oriented programming); Personalization; Database; Manufacturing engineering; Engineering; World Wide Web","score_opus":0.011121080700951908,"score_gpt":0.2086898818613051,"score_spread":0.1975688011603532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955466431","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31789201,0.0012024365,0.029290386,0.0016504374,0.00034209646,0.0012339752,0.5837292,0.058488008,0.006171435],"genre_scores_gemma":[0.2666025,0.0006302757,0.087959655,0.00023266353,0.00008648275,0.00054162816,0.6406635,0.0005849777,0.00269836],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9970041,0.00025369273,0.0003565515,0.000778417,0.0013835396,0.00022365151],"domain_scores_gemma":[0.9930473,0.0020286452,0.0008489265,0.0012930012,0.0022937153,0.00048840913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022439342,0.0011062013,0.00063048437,0.006365452,0.000861418,0.0021462485,0.0017063016,0.0009958327,0.001522599],"category_scores_gemma":[0.008423828,0.00028926812,0.00093099393,0.006522184,0.00045182116,0.0010481317,0.0011824173,0.0011909623,0.0015340421],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020298923,0.0021442694,0.27664068,0.004027106,0.00083970476,0.0062460564,0.005419637,0.04534829,0.049171735,0.0055042407,0.24182157,0.3608068],"study_design_scores_gemma":[0.00022991451,0.0004683667,0.42643064,0.0005457759,0.00022219839,0.0013075739,0.007017014,0.21916343,0.048190102,0.00368517,0.29246366,0.0002761517],"about_ca_topic_score_codex":0.115183555,"about_ca_topic_score_gemma":0.11466636,"teacher_disagreement_score":0.115183555,"about_ca_system_score_codex":0.0026626405,"about_ca_system_score_gemma":0.0036840441,"threshold_uncertainty_score":0.22902626},"labels":[],"label_agreement":null},{"id":"W2955467198","doi":"10.22260/isarc2019/0140","title":"Schedule Quality Assessment for nD Models using Industry Foundation Classes","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Schedule; Computer science; Quality (philosophy); Scheduling (production processes); Operations research; Software; Software engineering; Engineering; Operations management","score_opus":0.05298002145118099,"score_gpt":0.3041200264161804,"score_spread":0.25114000496499944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955467198","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17033197,0.00038179164,0.7960828,0.00025375906,0.00007301121,0.0007695025,0.0031631077,0.0023482873,0.02659571],"genre_scores_gemma":[0.661042,0.00048225743,0.3274524,0.000038151557,0.000024853027,0.00083544676,0.0053241192,0.00043896138,0.004361884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976388,0.0005220163,0.00022803358,0.00019761895,0.0013001943,0.00011333937],"domain_scores_gemma":[0.9927004,0.0033952158,0.0008111024,0.00065516337,0.0023294876,0.000108662956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035919875,0.0007532042,0.000619875,0.003017598,0.00045685712,0.0024141176,0.0012475942,0.0005241373,0.00556611],"category_scores_gemma":[0.012107798,0.00032345223,0.001706477,0.0018630631,0.00034061098,0.0011405976,0.0011943767,0.000684902,0.00061972433],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023825755,0.00017457965,0.016379138,0.00063189765,0.00009644679,0.00012450363,0.0005430594,0.7627345,0.0039359694,0.022406563,0.0036849254,0.18905017],"study_design_scores_gemma":[0.00001836601,0.00009461628,0.00455371,0.00012197533,0.000039072682,0.000036120095,0.0002409611,0.97561395,0.002472151,0.0031725797,0.013608214,0.000028286602],"about_ca_topic_score_codex":0.02405565,"about_ca_topic_score_gemma":0.016559543,"teacher_disagreement_score":0.02405565,"about_ca_system_score_codex":0.0029632205,"about_ca_system_score_gemma":0.0027758058,"threshold_uncertainty_score":0.047831297},"labels":[],"label_agreement":null},{"id":"W2955523957","doi":"10.22260/isarc2019/0165","title":"Case Study on Mobile Virtual Reality Construction Training","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Virtual reality; Lagging; Computer science; Craft; Download; Multimedia; Augmented reality; Mobile device; Human–computer interaction; World Wide Web","score_opus":0.0227026058004439,"score_gpt":0.2379289585506848,"score_spread":0.2152263527502409,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955523957","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7926056,0.0021656747,0.062225994,0.0051254705,0.00051156204,0.0016368643,0.0004596477,0.0002771774,0.134992],"genre_scores_gemma":[0.924698,0.0009613158,0.02691689,0.0003795095,0.00006860338,0.0003455236,0.00014170056,0.00007057308,0.046417966],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9968167,0.0017785486,0.000118436765,0.00022288602,0.0006408275,0.00042261195],"domain_scores_gemma":[0.9978871,0.0011174049,0.00015468668,0.00018000667,0.0002242626,0.0004366254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001633981,0.0006169839,0.0003659183,0.0013516911,0.0034727643,0.001878471,0.0019250959,0.0037150613,0.013174838],"category_scores_gemma":[0.0029762988,0.00032711055,0.00071337237,0.0012088214,0.0018492452,0.0013571513,0.0028168275,0.0013034845,0.0025519512],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001333192,0.0069851866,0.033588983,0.0038009647,0.00015028613,0.25780246,0.14757405,0.054952558,0.028737921,0.04707096,0.041371625,0.37663183],"study_design_scores_gemma":[0.0002660965,0.0041029006,0.030779507,0.0021398936,0.0001221666,0.093293235,0.19365239,0.037297197,0.02826917,0.0067177317,0.60306674,0.000293062],"about_ca_topic_score_codex":0.003667364,"about_ca_topic_score_gemma":0.008998877,"teacher_disagreement_score":0.013174838,"about_ca_system_score_codex":0.0013397818,"about_ca_system_score_gemma":0.0015021639,"threshold_uncertainty_score":0.044074178},"labels":[],"label_agreement":null},{"id":"W2955588086","doi":"10.29173/mocs91","title":"A Research Roadmap for Off-Site Construction: Automation and Robotics","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Robotics; Automation; Engineering management; Manufacturing engineering; Government (linguistics); Manufacturing; Engineering; Emerging technologies; Technology roadmap; Computer science; Artificial intelligence; Systems engineering; Robot; Process management; Business; Marketing","score_opus":0.012939396155194502,"score_gpt":0.236567965683315,"score_spread":0.2236285695281205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955588086","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006559593,0.20436881,0.11550499,0.31798017,0.0179647,0.004637142,0.0031794838,0.0035505733,0.32625458],"genre_scores_gemma":[0.08483787,0.32223436,0.42576164,0.024739292,0.0032390633,0.0051944484,0.012114152,0.0011146584,0.12076457],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9782478,0.0048392424,0.0015461956,0.0014513028,0.009607265,0.00430814],"domain_scores_gemma":[0.93705165,0.008277017,0.0017639836,0.0024717925,0.039538216,0.01089742],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031084679,0.0031012886,0.0021827673,0.012806496,0.007470826,0.020638913,0.0050550266,0.011384108,0.031934958],"category_scores_gemma":[0.017529977,0.0013686775,0.0021117276,0.014674186,0.0067074774,0.018208317,0.012976072,0.009794914,0.017087337],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012165666,0.0004798728,0.0015631404,0.005283759,0.000036040157,0.00040431565,0.0013810942,0.003087224,0.0020045314,0.21095325,0.23479684,0.53988844],"study_design_scores_gemma":[0.000019616411,0.00019711854,0.0021306595,0.0033597206,0.000020786052,0.0001683944,0.0027123957,0.0010030665,0.00049447163,0.028152885,0.961672,0.00006879676],"about_ca_topic_score_codex":0.13135532,"about_ca_topic_score_gemma":0.13378103,"teacher_disagreement_score":0.13135532,"about_ca_system_score_codex":0.02635758,"about_ca_system_score_gemma":0.19711591,"threshold_uncertainty_score":0.26118147},"labels":[],"label_agreement":null},{"id":"W2955620045","doi":"10.29173/mocs99","title":"Calibrating CII RT283’s Modularization Critical Success Factor Accomplishments","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Texas at Austin","keywords":"Modular programming; Modular design; Critical success factor; Computer science; Sample (material); Project management; Estimation; Operations management; Engineering; Systems engineering; Knowledge management","score_opus":0.0064484960170310135,"score_gpt":0.20363059842499423,"score_spread":0.19718210240796322,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955620045","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9681484,0.000029105362,0.014376913,0.000046758134,0.000008426291,0.0003078565,0.00048337912,0.00017687852,0.016422363],"genre_scores_gemma":[0.97474754,0.00004485315,0.022214025,0.000010265191,0.0000042390343,0.000380228,0.00097581936,0.00004423254,0.0015788588],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9956102,0.00078386103,0.00035301878,0.00040367089,0.002503177,0.0003461568],"domain_scores_gemma":[0.976523,0.0062221037,0.0023649822,0.0020611028,0.011999678,0.00082908984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008270245,0.00083436526,0.00032378573,0.0048164492,0.0005598473,0.0012844176,0.00082456577,0.00042267184,0.0027076325],"category_scores_gemma":[0.028572487,0.0003391983,0.0004750888,0.0033526933,0.0005706232,0.00093955535,0.00129672,0.0005889935,0.0012637483],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003711668,0.0005346996,0.74135345,0.00022620555,0.00009070655,0.00020440976,0.006287441,0.022493314,0.011691288,0.002195486,0.0029613054,0.21159054],"study_design_scores_gemma":[0.000023718449,0.0008050652,0.9294363,0.00006284785,0.000036343135,0.000207746,0.0038294916,0.045866705,0.010085865,0.000692486,0.008890191,0.00006317721],"about_ca_topic_score_codex":0.012350482,"about_ca_topic_score_gemma":0.013374269,"teacher_disagreement_score":0.012350482,"about_ca_system_score_codex":0.002833242,"about_ca_system_score_gemma":0.0018516443,"threshold_uncertainty_score":0.04373777},"labels":[],"label_agreement":null},{"id":"W2955632512","doi":"10.22260/isarc2019/0021","title":"The Benefits of and Barriers to BIM Adoption in Canada","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Download; Stakeholder; Asset (computer security); Benchmark (surveying); Process (computing); Business; Computer science; Engineering; Public relations; Political science; World Wide Web; Operations management; Geography","score_opus":0.004210997466046068,"score_gpt":0.1643606300440972,"score_spread":0.16014963257805115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955632512","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97619617,0.0006897525,0.00029177728,0.004807808,0.000028027707,0.00009849432,0.001617846,0.000030788022,0.016239326],"genre_scores_gemma":[0.9962542,0.0007748334,0.00037206334,0.00025205166,0.0000029579573,0.000040895855,0.00040304734,0.000009490283,0.0018902884],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9930704,0.00060398964,0.0002670617,0.0003582891,0.0037125936,0.0019876508],"domain_scores_gemma":[0.9874379,0.0017815313,0.0011628043,0.00024283335,0.006997683,0.0023772141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003312251,0.00028149007,0.0003930445,0.0024348474,0.0065889913,0.0041539907,0.0011336548,0.00055316155,0.0031636532],"category_scores_gemma":[0.011810365,0.0003486245,0.00040170347,0.007664855,0.0023597404,0.0012126432,0.0036192103,0.0014285423,0.00020352902],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023921105,0.00027071018,0.79143876,0.00047390405,0.000061431085,0.0006170026,0.074890815,0.0008339403,0.0008597558,0.008698825,0.015395648,0.1062201],"study_design_scores_gemma":[0.000008735273,0.000050652612,0.87198967,0.0002854256,0.000025913247,0.0000715906,0.10489523,0.0011711379,0.0003462921,0.00038123602,0.020685924,0.00008816265],"about_ca_topic_score_codex":0.9944108,"about_ca_topic_score_gemma":0.99611986,"teacher_disagreement_score":0.07779263,"about_ca_system_score_codex":0.07779263,"about_ca_system_score_gemma":0.17255639,"threshold_uncertainty_score":0.5644277},"labels":[],"label_agreement":null},{"id":"W2955648368","doi":"10.29173/mocs129","title":"RFID-Integrated Software Platform for Construction Materials Management","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Global Positioning System; Kanban; Computer science; Systems engineering; Software; System integration; Database; Telecommunications; Engineering; Operating system","score_opus":0.005944652689611979,"score_gpt":0.1822361675474688,"score_spread":0.17629151485785682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955648368","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014805535,0.00062000786,0.8780511,0.00021269523,0.00020596324,0.00027480637,0.0006323203,0.08653846,0.018659152],"genre_scores_gemma":[0.3306545,0.0015144519,0.5754627,0.00076862954,0.00017062381,0.0008833299,0.0064979824,0.0061540287,0.07789382],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991008,0.000118904616,0.00008191132,0.00016138966,0.00042496956,0.00011201258],"domain_scores_gemma":[0.999302,0.00012958692,0.00007396679,0.00020428805,0.00021048861,0.00007964196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010424644,0.000864878,0.0005989956,0.0012795122,0.00033111792,0.0017383891,0.0018483221,0.0010459004,0.009776187],"category_scores_gemma":[0.0016212711,0.00046765245,0.00068534305,0.00094255403,0.0003277883,0.0017655443,0.0017278707,0.0011706081,0.008815625],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00095334667,0.0007912092,0.0035766582,0.00072625524,0.00017566296,0.0010346808,0.0007950563,0.02493038,0.13555124,0.04443043,0.05088024,0.7361549],"study_design_scores_gemma":[0.00022639551,0.00077169325,0.00511905,0.0002927893,0.00021374824,0.0015632706,0.00024600583,0.34964234,0.1661816,0.026185887,0.44929573,0.00026156282],"about_ca_topic_score_codex":0.00084875745,"about_ca_topic_score_gemma":0.00051801826,"teacher_disagreement_score":0.009776187,"about_ca_system_score_codex":0.00040536816,"about_ca_system_score_gemma":0.00075945526,"threshold_uncertainty_score":0.03270459},"labels":[],"label_agreement":null},{"id":"W2955810178","doi":"10.29173/mocs114","title":"Case Study: Off-site manufacturing of EIFS Panelized Wall Assemblies to Gain Efficiency in Construction Sequencing","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Engineering; Envelope (radar); Quality (philosophy); Control (management); Transport engineering; Manufacturing engineering; Process (computing); Architectural engineering; Civil engineering; Construction engineering; Computer science; Operating system","score_opus":0.010688073499358868,"score_gpt":0.20870563810626339,"score_spread":0.1980175646069045,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955810178","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9834368,0.000029032484,0.009707773,0.000056040513,0.000008739733,0.00012691952,0.00014490738,0.00006905655,0.0064207497],"genre_scores_gemma":[0.96503454,0.00005172052,0.030716185,0.00001997298,0.0000043321993,0.000060572802,0.00016776158,0.000039267652,0.0039056398],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9984403,0.00048273007,0.00007296459,0.00017776863,0.00058539526,0.00024084642],"domain_scores_gemma":[0.9975171,0.0010890884,0.00022826508,0.0005885443,0.00037854683,0.00019844729],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017924886,0.00053423765,0.00038093605,0.0008727421,0.0013248445,0.00086887256,0.00096639834,0.0011997609,0.0038523395],"category_scores_gemma":[0.0029800665,0.00034713343,0.00059278595,0.0009573245,0.00076620036,0.0005937184,0.0009127246,0.00075436826,0.0006413079],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027504796,0.0057040416,0.16368048,0.0011627512,0.00013949363,0.034298092,0.02150599,0.267896,0.16355713,0.009587832,0.00570108,0.32401666],"study_design_scores_gemma":[0.0003666605,0.01456939,0.31512704,0.00033064227,0.00021935618,0.015591203,0.054289743,0.17116717,0.3521857,0.004652798,0.07124,0.00026035978],"about_ca_topic_score_codex":0.0053848587,"about_ca_topic_score_gemma":0.019368289,"teacher_disagreement_score":0.0053848587,"about_ca_system_score_codex":0.0011954387,"about_ca_system_score_gemma":0.0010626029,"threshold_uncertainty_score":0.012887359},"labels":[],"label_agreement":null},{"id":"W2955851017","doi":"10.29173/mocs88","title":"Lean as an Integrator of Modular Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Workflow; Lean construction; Lean project management; Factory (object-oriented programming); Process (computing); Manufacturing engineering; Lean manufacturing; Systems engineering; Engineering; Process management; Integrator; Lean laboratory; Computer science; Construction engineering; Construction industry","score_opus":0.004184313196084121,"score_gpt":0.18379407093432187,"score_spread":0.17960975773823776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955851017","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058760714,0.0016333775,0.742727,0.003028248,0.000311842,0.0002624343,0.000110191744,0.0015973543,0.19156888],"genre_scores_gemma":[0.55012465,0.0016796984,0.40561607,0.0005815992,0.00016236631,0.0002598655,0.00018492607,0.00042471246,0.040966075],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.996335,0.0010672398,0.00016500421,0.00038654517,0.0017339614,0.00031222065],"domain_scores_gemma":[0.99582386,0.0011180474,0.0005628801,0.0009441001,0.0010941286,0.0004568551],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004949197,0.00069172285,0.00035687638,0.0024929317,0.0010158994,0.005074928,0.0013371112,0.0009393481,0.0058966675],"category_scores_gemma":[0.0047659446,0.0005511338,0.0006333164,0.0017077447,0.0034869765,0.0055997567,0.004885971,0.0013151397,0.0012406347],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107380736,0.00011803594,0.0034120923,0.00033671613,0.000044906705,0.0003945712,0.0026382075,0.013670092,0.0048707966,0.8177329,0.0032805884,0.15339367],"study_design_scores_gemma":[0.000066133325,0.0005237208,0.0035254227,0.0006409022,0.00009314277,0.00088811404,0.002972833,0.061168905,0.00846223,0.6398107,0.28175732,0.000090632304],"about_ca_topic_score_codex":0.0014535257,"about_ca_topic_score_gemma":0.0018959028,"teacher_disagreement_score":0.0058966675,"about_ca_system_score_codex":0.0021129528,"about_ca_system_score_gemma":0.0040985392,"threshold_uncertainty_score":0.026174188},"labels":[],"label_agreement":null},{"id":"W2955865348","doi":"10.29173/mocs97","title":"Mass Timber Modular Construction: Developments in Oregon","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Food and Agriculture; TallWood Design Institute; U.S. Department of Agriculture","keywords":"Modular design; Architectural engineering; Engineering; Government (linguistics); Scale (ratio); Frame (networking); Civil engineering; Business; Computer science; Telecommunications; Geography","score_opus":0.0040666031071489445,"score_gpt":0.169194541185728,"score_spread":0.16512793807857906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955865348","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46154585,0.0019478999,0.0034647533,0.0030002345,0.00017470756,0.0001261576,0.00096409785,0.00027518297,0.5285011],"genre_scores_gemma":[0.7940595,0.0046973205,0.011866667,0.00068075943,0.000070968286,0.000102622194,0.0016774134,0.0002120272,0.18663278],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99969363,0.000023124428,0.00001354159,0.0000530673,0.00013699602,0.00007952416],"domain_scores_gemma":[0.99961144,0.00006394035,0.00004635869,0.000039363666,0.000096068616,0.00014293939],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058401696,0.00023096915,0.00006468584,0.0008730016,0.0019566184,0.0019969721,0.0007840037,0.00042935825,0.021313496],"category_scores_gemma":[0.0006162032,0.00020624936,0.0002816568,0.001166275,0.0011836585,0.001808338,0.0019612862,0.0011250114,0.001226379],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047537065,0.0017238415,0.10951902,0.00042994763,0.00002843335,0.008215427,0.01108925,0.0024941086,0.016329281,0.16791502,0.06062212,0.62115824],"study_design_scores_gemma":[0.000023273327,0.00031032346,0.098284766,0.0003372121,0.000019088513,0.0019079814,0.012379489,0.0010988783,0.0051839314,0.0045899414,0.87582374,0.000041456915],"about_ca_topic_score_codex":0.03293331,"about_ca_topic_score_gemma":0.17721336,"teacher_disagreement_score":0.03293331,"about_ca_system_score_codex":0.0031475455,"about_ca_system_score_gemma":0.0022835713,"threshold_uncertainty_score":0.071300745},"labels":[],"label_agreement":null},{"id":"W2955871541","doi":"10.29173/mocs138","title":"Developing an Analytical Solution that Mimics Simulation Modeling for Construction Planning: Earthwork Case","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta","keywords":"Earthworks; Benchmark (surveying); Plan (archaeology); Computer science; Field (mathematics); Industrial engineering; Operations research; Engineering; Mathematics; Geology","score_opus":0.04006334564664626,"score_gpt":0.26153334331250294,"score_spread":0.22146999766585668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955871541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041878138,0.000095306284,0.9413955,0.0004011278,0.000051568764,0.00018542698,0.00035888518,0.00050435436,0.015129623],"genre_scores_gemma":[0.5566831,0.00028090473,0.43553856,0.000097797485,0.000028353139,0.0005768921,0.0003247865,0.0001242633,0.0063452846],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994536,0.0002044087,0.000036709327,0.00009295448,0.00014381674,0.00006852877],"domain_scores_gemma":[0.9985293,0.00084522873,0.00017009949,0.00011781245,0.00028987983,0.000047627233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011353899,0.00072206423,0.00068684405,0.0011148719,0.00077070144,0.0016918089,0.0014995363,0.0020453872,0.0057311947],"category_scores_gemma":[0.003536251,0.00056978216,0.00077040587,0.0010338977,0.000510905,0.0009960058,0.001009647,0.0010794387,0.0007152512],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020196381,0.00006047211,0.000843322,0.00006311939,0.000011168765,0.00019358163,0.00008352508,0.9624229,0.00093710585,0.02200823,0.0006295797,0.012726802],"study_design_scores_gemma":[0.000005821516,0.000013894484,0.000118952696,0.000013471017,0.0000052083105,0.00003619047,0.000044311942,0.99428916,0.0005415404,0.0033392669,0.0015848966,0.0000073048886],"about_ca_topic_score_codex":0.014843825,"about_ca_topic_score_gemma":0.013032341,"teacher_disagreement_score":0.014843825,"about_ca_system_score_codex":0.0012414067,"about_ca_system_score_gemma":0.0025227712,"threshold_uncertainty_score":0.02951485},"labels":[],"label_agreement":null},{"id":"W2955909757","doi":"10.29173/mocs94","title":"A Pilot Study of Identifying Execution Plan Differences for Accelerated Bridge Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Plan (archaeology); Computer science; Preference; Process management; Operations management; Transport engineering; Engineering; Medicine","score_opus":0.038054593446177294,"score_gpt":0.23284344296574985,"score_spread":0.19478884951957257,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955909757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99784446,0.00002960246,0.0005478532,0.00005114676,0.000008937724,0.000630537,0.000055352164,0.000004170698,0.0008278982],"genre_scores_gemma":[0.9907244,0.00011777018,0.0057213963,0.000087644396,0.000008912292,0.0020491655,0.00014457603,0.000006324265,0.0011399485],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9944765,0.0026483946,0.0006053532,0.00053096557,0.0011133194,0.0006255206],"domain_scores_gemma":[0.95157766,0.026849143,0.006365133,0.0021175337,0.010842759,0.0022477317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015155169,0.00035892782,0.000504987,0.0015080078,0.001403441,0.0018984528,0.0008338971,0.0008490203,0.0033797575],"category_scores_gemma":[0.039745037,0.00048208493,0.00066158455,0.001367583,0.0009760676,0.001912249,0.0010383278,0.0015585248,0.0003996264],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00371316,0.041100524,0.5264823,0.0019612685,0.00017933208,0.00247803,0.2091479,0.0014448385,0.011902061,0.0039897817,0.0024122337,0.19518848],"study_design_scores_gemma":[0.00046801692,0.028069394,0.7078097,0.00041893157,0.00016397392,0.00043294666,0.24389002,0.0028342868,0.0040810187,0.00105206,0.010654196,0.00012549017],"about_ca_topic_score_codex":0.003652641,"about_ca_topic_score_gemma":0.008314626,"teacher_disagreement_score":0.015155169,"about_ca_system_score_codex":0.0028004344,"about_ca_system_score_gemma":0.0054927715,"threshold_uncertainty_score":0.080149114},"labels":[],"label_agreement":null},{"id":"W2955930255","doi":"10.29173/mocs117","title":"Decision-making for Cross-Laminated Timber Modular Construction Logistics Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Supply chain; Modular construction; Discrete event simulation; Process (computing); Modularity (biology); Event (particle physics); Work (physics); Engineering; Cross laminated timber; Construction engineering; Computer science; Civil engineering; Business; Simulation; Mechanical engineering","score_opus":0.009764285313812465,"score_gpt":0.2647800476268293,"score_spread":0.2550157623130168,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955930255","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3067875,0.00039845277,0.67715734,0.0012640138,0.0001274001,0.00060207973,0.00088518596,0.0003960802,0.012381922],"genre_scores_gemma":[0.9653404,0.00021897147,0.030567108,0.00007648043,0.000017249034,0.00033543026,0.00030858704,0.000023257355,0.0031126412],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998415,0.00092693354,0.00006619604,0.00019417376,0.00015436522,0.00024330492],"domain_scores_gemma":[0.9873022,0.010856387,0.0006527258,0.0001462275,0.00056000863,0.0004825054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004042205,0.0012803223,0.001758037,0.0011149368,0.0007339802,0.0027775115,0.0017140174,0.0021674156,0.0057196585],"category_scores_gemma":[0.0074442173,0.0011871199,0.0016769862,0.0009456813,0.0010714526,0.0012663165,0.0015367834,0.0022438308,0.0002564606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040540803,0.000019410107,0.00031607508,0.0000096544245,0.000011295996,0.000022381222,0.000007952442,0.99808455,0.000055411227,0.00087838416,0.000038898757,0.0005154172],"study_design_scores_gemma":[0.000007879809,0.000011644238,0.000043274817,0.0000016584203,0.000003244225,0.0000011488287,0.000008960325,0.9994467,0.000040291274,0.00039272406,0.0000401265,0.0000022387871],"about_ca_topic_score_codex":0.02563298,"about_ca_topic_score_gemma":0.013053026,"teacher_disagreement_score":0.02563298,"about_ca_system_score_codex":0.002225115,"about_ca_system_score_gemma":0.0030467978,"threshold_uncertainty_score":0.050967574},"labels":[],"label_agreement":null},{"id":"W2955960142","doi":"10.29173/mocs141","title":"Logistics Planning and Visualization of Modular Integrated Construction Projects Based on BIM-GIS Integration and Vehicle Routing Algorithm","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Visualization; Modular design; Vehicle routing problem; Computer science; Building information modeling; Integrated logistics support; Systems engineering; Routing (electronic design automation); Transport engineering; Operations research; Process management; Engineering; Operations management; Data mining; Embedded system","score_opus":0.009553049174982588,"score_gpt":0.21051484241603066,"score_spread":0.20096179324104807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955960142","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.086497605,0.00014203526,0.9034799,0.00021955531,0.000026642754,0.00011519635,0.00036387861,0.0023815269,0.0067736623],"genre_scores_gemma":[0.5618766,0.00027357126,0.43436742,0.000025051288,0.000007879987,0.00016361717,0.00063211255,0.00012354017,0.0025301895],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998123,0.000056792687,0.000010227701,0.00003262524,0.000060210965,0.000027876964],"domain_scores_gemma":[0.9998529,0.00004642595,0.00001778339,0.00001879725,0.00004619453,0.0000178711],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040229148,0.00070619624,0.00042479165,0.0011698746,0.00031380038,0.0011104039,0.0005840075,0.00041948294,0.0025175489],"category_scores_gemma":[0.00068898784,0.0004126083,0.0006495165,0.0010519375,0.00020248262,0.00071545294,0.0009651262,0.0003689115,0.0003574774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008625555,0.000069936534,0.0023886152,0.00005163154,0.000023496057,0.00013359751,0.00013329195,0.9037265,0.004519379,0.004962978,0.0015963436,0.08230805],"study_design_scores_gemma":[0.0000046681394,0.000012627379,0.0003912024,0.0000038857893,0.0000041430694,0.000018162436,0.000039254403,0.99697375,0.00089911063,0.0007551652,0.0008924608,0.000005675296],"about_ca_topic_score_codex":0.009389556,"about_ca_topic_score_gemma":0.009118806,"teacher_disagreement_score":0.009389556,"about_ca_system_score_codex":0.0005686317,"about_ca_system_score_gemma":0.0012246835,"threshold_uncertainty_score":0.018669784},"labels":[],"label_agreement":null},{"id":"W2955994317","doi":"10.29173/mocs133","title":"Strategies for Building Information Modelling Adoption in the South African Construction Industry","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Procurement; Building information modeling; Business; Work (physics); Construction industry; Questionnaire; Process management; Test (biology); Process (computing); Knowledge management; Marketing; Operations management; Engineering; Construction engineering; Computer science","score_opus":0.009374625203429156,"score_gpt":0.1903746049770553,"score_spread":0.18099997977362614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2955994317","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94255984,0.0010506889,0.009447713,0.007005975,0.000012588032,0.00022269327,0.000045756464,0.000058715326,0.039596092],"genre_scores_gemma":[0.9910787,0.0009372968,0.005874397,0.00013568907,0.0000018035295,0.00004715722,0.000024958552,0.000010583528,0.0018893935],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99527514,0.0026903325,0.00026997106,0.0002458809,0.00082223647,0.0006964691],"domain_scores_gemma":[0.9949772,0.0029620253,0.00088295416,0.0003467453,0.0004967735,0.00033439428],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004936964,0.000491712,0.00019616357,0.002976439,0.0025504294,0.0053055678,0.0007337655,0.00095932867,0.0030025141],"category_scores_gemma":[0.008977614,0.000526725,0.00035929555,0.0035154668,0.0017055179,0.0029515983,0.004755536,0.0010476026,0.00040733695],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014457444,0.00052537787,0.1064237,0.0011833478,0.00005725459,0.004489169,0.4366593,0.002273675,0.012226342,0.055836495,0.0025168788,0.37766385],"study_design_scores_gemma":[0.000049346632,0.00045076155,0.11426943,0.002846401,0.00014276688,0.0036409288,0.6444159,0.009325111,0.0116334725,0.016992228,0.19608189,0.00015176584],"about_ca_topic_score_codex":0.007858357,"about_ca_topic_score_gemma":0.009167318,"teacher_disagreement_score":0.007858357,"about_ca_system_score_codex":0.0033653534,"about_ca_system_score_gemma":0.0067315698,"threshold_uncertainty_score":0.026109457},"labels":[],"label_agreement":null},{"id":"W2956000842","doi":"10.29173/mocs71","title":"Automatic Material Estimation by Translating BIM Data into ERP Readable Data for Panelized Residential Construction","year":2019,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Schedule; Computer science; Prefabrication; Estimation; Process (computing); Cost estimate; Building information modeling; Production (economics); Resource (disambiguation); Systems engineering; Industrial engineering; Engineering; Scheduling (production processes); Civil engineering; Operations management","score_opus":0.014025071660805018,"score_gpt":0.22944036954830616,"score_spread":0.21541529788750113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956000842","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033094246,0.0001030034,0.9322078,0.00013595243,0.00007022139,0.00026592036,0.0011596555,0.02869723,0.0042660963],"genre_scores_gemma":[0.20814535,0.00019373116,0.7838018,0.00008622312,0.000033910997,0.0003525404,0.0035866613,0.0008120223,0.0029877846],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999252,0.00013729458,0.000071837356,0.00017789923,0.00031823432,0.000042661708],"domain_scores_gemma":[0.999035,0.00026500647,0.000091584996,0.00022540515,0.00035671692,0.00002637794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079164054,0.00065623055,0.00046572468,0.0022888798,0.0003674135,0.001134423,0.00078246545,0.0004006672,0.004633904],"category_scores_gemma":[0.002372674,0.00046018724,0.00040868274,0.0018495946,0.0001963507,0.001195413,0.0008788217,0.00047006476,0.002514606],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029643773,0.00023284824,0.004897373,0.00023956767,0.0000484836,0.0005829464,0.00036922898,0.018377982,0.07768651,0.0040470776,0.01752528,0.87569624],"study_design_scores_gemma":[0.00010862279,0.000262629,0.023947272,0.00012730405,0.00010260942,0.0008991552,0.00062650914,0.7065,0.18802339,0.005102631,0.07404317,0.00025675423],"about_ca_topic_score_codex":0.0021067464,"about_ca_topic_score_gemma":0.0019192976,"teacher_disagreement_score":0.004633904,"about_ca_system_score_codex":0.00035383625,"about_ca_system_score_gemma":0.0006648911,"threshold_uncertainty_score":0.015501976},"labels":[],"label_agreement":null},{"id":"W2956029429","doi":"10.22260/isarc2019/0107","title":"Application of Virtual Reality in Task Training in the Construction Manufacturing Industry","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":50,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Task (project management); Virtual reality; Automation; Computer science; Manufacturing; Quality (philosophy); Human–computer interaction; Virtual machine; Manufacturing engineering; Simulation; Engineering; Systems engineering; Operating system","score_opus":0.010830899780006707,"score_gpt":0.2117044826069254,"score_spread":0.2008735828269187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956029429","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.651626,0.018315705,0.25511533,0.0023013887,0.00032422435,0.00051726535,0.00025600265,0.0009921853,0.07055186],"genre_scores_gemma":[0.93266445,0.0051603937,0.05891298,0.0001669276,0.000057827434,0.00011229412,0.00008137185,0.00003947086,0.0028043373],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99863297,0.00083214993,0.000040804403,0.00008274789,0.00032300083,0.000088248875],"domain_scores_gemma":[0.9989214,0.0007136327,0.00006909539,0.00007283243,0.00016709839,0.000056084868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013370648,0.00036785335,0.0002268218,0.0011169806,0.00022305155,0.0010667314,0.00048101682,0.0006989484,0.0028544962],"category_scores_gemma":[0.0019771832,0.00018625808,0.00034143482,0.00066208007,0.00042593371,0.00047482463,0.0012506208,0.00033054766,0.00046404736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005684473,0.000796072,0.0071821893,0.0011038209,0.00008447366,0.00041252238,0.0028928325,0.020075323,0.043325607,0.003321758,0.0038417012,0.91639537],"study_design_scores_gemma":[0.00042844625,0.0141893,0.3012509,0.0041400827,0.0007060439,0.006343742,0.015852762,0.28000185,0.14299761,0.013390261,0.2199152,0.0007837806],"about_ca_topic_score_codex":0.0016362563,"about_ca_topic_score_gemma":0.0018342625,"teacher_disagreement_score":0.0028544962,"about_ca_system_score_codex":0.00037263325,"about_ca_system_score_gemma":0.0004110415,"threshold_uncertainty_score":0.00954926},"labels":[],"label_agreement":null},{"id":"W2956114766","doi":"10.22260/isarc2019/0024","title":"Automated Mathematical-Based Design Framework for The Selection of Rigging Configuration","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Offset (computer science); Modular programming; Row; Computer science; Engineering drawing; Engineering; Reliability engineering; Database","score_opus":0.013670427000141792,"score_gpt":0.22913067007729132,"score_spread":0.21546024307714953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2956114766","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015885999,0.0000925677,0.9934221,0.000040679693,0.000011599395,0.00022971744,0.00013551237,0.0028262427,0.0016530117],"genre_scores_gemma":[0.043070618,0.00020601682,0.95317066,0.00006177033,0.000019357261,0.00058913854,0.0009537224,0.00046792498,0.0014608083],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9959943,0.000733594,0.00038598705,0.0005234881,0.002049701,0.00031287083],"domain_scores_gemma":[0.9976476,0.0009263138,0.00023585492,0.00039183788,0.0007132374,0.00008525017],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0040021176,0.0025335564,0.0017660571,0.0038571844,0.0009647001,0.0036304232,0.0036931548,0.0012822944,0.008723729],"category_scores_gemma":[0.0064621023,0.001387602,0.0034498773,0.0012638374,0.0011635548,0.001875158,0.0027596492,0.001690623,0.0031836],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002590719,0.00038459987,0.0021932134,0.0013610843,0.00018624774,0.0008332128,0.000744965,0.5255439,0.0323252,0.08089846,0.008280927,0.3469891],"study_design_scores_gemma":[0.000069617374,0.0001268,0.00025577468,0.00015264355,0.00007730296,0.00027317222,0.00010269606,0.950367,0.009097773,0.015254678,0.024161119,0.00006149444],"about_ca_topic_score_codex":0.0049325526,"about_ca_topic_score_gemma":0.0063812267,"teacher_disagreement_score":0.008723729,"about_ca_system_score_codex":0.0014387605,"about_ca_system_score_gemma":0.0033450255,"threshold_uncertainty_score":0.029183805},"labels":[],"label_agreement":null},{"id":"W2958067827","doi":"10.1139/cjce-2018-0460","title":"A semantic-based framework for automated rule checking in healthcare construction projects","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universidade Federal do Rio Grande do Sul; Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Computer science; Redevelopment; Context (archaeology); Health care; Software engineering; Taxonomy (biology); Rule-based system; Systems engineering; Management science; Data science; Process management; Artificial intelligence; Engineering","score_opus":0.008341263069765991,"score_gpt":0.20901017998344232,"score_spread":0.20066891691367633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2958067827","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015229243,0.00007275159,0.99487454,0.00021394446,0.000016104412,0.00026366688,0.00015081812,0.0015435367,0.0013417574],"genre_scores_gemma":[0.0401613,0.0001459536,0.9577799,0.00009419635,0.000022640696,0.00036467685,0.00051930227,0.00015556057,0.0007564142],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9871737,0.0051055574,0.0021690598,0.001658244,0.0031076379,0.00078589877],"domain_scores_gemma":[0.98939043,0.0053855637,0.00093257456,0.0020601398,0.001840708,0.0003905423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013335935,0.0014501261,0.0014966483,0.008091973,0.0025920332,0.009486743,0.004812819,0.0032175942,0.004993042],"category_scores_gemma":[0.019810138,0.0016719525,0.005331816,0.004121257,0.005463807,0.0076157195,0.0057627405,0.003653436,0.0017315372],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013620208,0.00034414334,0.001931576,0.0007125292,0.00017792924,0.0014094065,0.0027857206,0.11461568,0.0046132477,0.7365204,0.003773563,0.13297962],"study_design_scores_gemma":[0.00007345172,0.00011503186,0.0006900346,0.0005424109,0.00015003912,0.00061934715,0.0009320096,0.582767,0.0065137087,0.3633654,0.044088908,0.00014265724],"about_ca_topic_score_codex":0.018178187,"about_ca_topic_score_gemma":0.018013842,"teacher_disagreement_score":0.018178187,"about_ca_system_score_codex":0.003244504,"about_ca_system_score_gemma":0.0062079164,"threshold_uncertainty_score":0.07052797},"labels":[],"label_agreement":null},{"id":"W2959463108","doi":"10.1139/cjce-2018-0382","title":"Design-related questions in the construction phase: the effect of using the Last Planner System in design management","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Tekes; Academy of Finland","keywords":"Planner; Phase (matter); Knowledge management; Engineering; Engineering management; Construction management; Design management; Collaborative design; Computer science; Construction engineering; Process management; Systems engineering; Systems design; Civil engineering; Information management","score_opus":0.0070712230067670615,"score_gpt":0.18812743259134243,"score_spread":0.18105620958457536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959463108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96011573,0.00042858327,0.021995421,0.0012725046,0.00011421384,0.00074147986,0.00009473276,0.00079971825,0.014437708],"genre_scores_gemma":[0.9662713,0.000213572,0.028107038,0.00047561977,0.000058284193,0.0008326664,0.00014218077,0.00020924429,0.0036902267],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.904988,0.07558352,0.004352432,0.0053187413,0.007137038,0.0026203664],"domain_scores_gemma":[0.37436256,0.57277894,0.021801358,0.015514724,0.0100421,0.005500308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.045370556,0.0015115774,0.0012675407,0.0022015173,0.0030952427,0.0054195025,0.002893703,0.0033282961,0.0076201707],"category_scores_gemma":[0.28801537,0.0014525088,0.001072784,0.0013406837,0.0035336977,0.007146719,0.0076231724,0.0039222236,0.0013033771],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009996718,0.008695467,0.14187531,0.00440772,0.00039346077,0.0021602106,0.29277274,0.008331753,0.06728006,0.004324603,0.0051435824,0.45461842],"study_design_scores_gemma":[0.0027636488,0.026278034,0.3913139,0.0028636835,0.0014317351,0.0028182645,0.3400733,0.038217038,0.044029906,0.011303039,0.1376545,0.0012530428],"about_ca_topic_score_codex":0.002930635,"about_ca_topic_score_gemma":0.0034239648,"teacher_disagreement_score":0.045370556,"about_ca_system_score_codex":0.0026507415,"about_ca_system_score_gemma":0.0034776307,"threshold_uncertainty_score":0.23994535},"labels":[],"label_agreement":null},{"id":"W2959608112","doi":"10.4224/20373962","title":"Entertainment-based system for visual construction technology transfer: design and implementation","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scope (computer science); Computer science; Entertainment; Representation (politics); Human–computer interaction; Multimedia; Engineering; Political science","score_opus":0.005461950992025521,"score_gpt":0.2295097673858054,"score_spread":0.22404781639377988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2959608112","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09225068,0.00015376082,0.8809262,0.00022694598,0.000058341542,0.002951211,0.00037656532,0.0060451175,0.017011127],"genre_scores_gemma":[0.31356776,0.00022258138,0.669141,0.00013837748,0.00001927701,0.0025155393,0.0007144088,0.00041858933,0.0132624535],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991761,0.0002766411,0.000060239083,0.00009971692,0.00032214445,0.00006510063],"domain_scores_gemma":[0.9995322,0.00013885267,0.00001698698,0.000070502465,0.00018132893,0.000059995233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018704631,0.00048333532,0.00038540555,0.0008656448,0.00041915633,0.0011960139,0.0017130238,0.00096049235,0.010489418],"category_scores_gemma":[0.0017082823,0.0003773745,0.0003097937,0.0004800052,0.00057857326,0.001020992,0.0012583445,0.0005654314,0.0018240276],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010856269,0.0020913018,0.00840837,0.0012671922,0.00010488509,0.00088325347,0.0043508275,0.023853974,0.11957442,0.03666561,0.010776691,0.7909378],"study_design_scores_gemma":[0.001157166,0.007750559,0.03325636,0.00069142005,0.0004827166,0.0029659392,0.00463776,0.41450685,0.24696955,0.012260761,0.27494577,0.00037517076],"about_ca_topic_score_codex":0.0016062342,"about_ca_topic_score_gemma":0.0014382416,"teacher_disagreement_score":0.010489418,"about_ca_system_score_codex":0.0006682284,"about_ca_system_score_gemma":0.0010509879,"threshold_uncertainty_score":0.035090566},"labels":[],"label_agreement":null},{"id":"W2960085298","doi":"10.1108/ci-06-2018-0052","title":"BIM-based framework for temporary facility layout planning in construction site","year":2019,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Computer science; Solver; Process (computing); Page layout; Building information modeling; Data collection; Industrial engineering; Engineering","score_opus":0.017487760616347145,"score_gpt":0.24519119676363743,"score_spread":0.22770343614729027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2960085298","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017598224,0.00015152391,0.9911969,0.00014490455,0.000017994553,0.00009466972,0.00028516163,0.00026835044,0.0060807723],"genre_scores_gemma":[0.1093756,0.0006130404,0.88449025,0.000053496726,0.00001851504,0.0006318177,0.0010334215,0.00011190421,0.0036719847],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99833137,0.00061646424,0.00011217914,0.0002385599,0.0005878614,0.000113499205],"domain_scores_gemma":[0.99936455,0.00019793492,0.000092887174,0.00010647252,0.00018834614,0.000049831135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020371976,0.00087084854,0.0007415031,0.0031977922,0.00078207115,0.0039421045,0.0024871815,0.0010917422,0.0061265226],"category_scores_gemma":[0.0024795013,0.00070205337,0.0017335238,0.0037714841,0.0011638347,0.0021035632,0.002646498,0.0011187856,0.0011684601],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023127059,0.00006374828,0.001234766,0.0003293744,0.000042877622,0.00023695898,0.0004543893,0.6601054,0.0014795277,0.25109455,0.003167981,0.08176728],"study_design_scores_gemma":[0.00001063354,0.000044292985,0.0007279472,0.00019643079,0.0000347111,0.00016622666,0.00050000765,0.87741375,0.0011060834,0.07415416,0.045598883,0.000046832934],"about_ca_topic_score_codex":0.01078793,"about_ca_topic_score_gemma":0.015233793,"teacher_disagreement_score":0.01078793,"about_ca_system_score_codex":0.0023676215,"about_ca_system_score_gemma":0.0036642218,"threshold_uncertainty_score":0.021450281},"labels":[],"label_agreement":null},{"id":"W2960998055","doi":"10.1139/cjce-2018-0571","title":"A reality-based energy analysis of high-performance residences: Part I","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Read Jones Christoffersen (Canada); University of Victoria","funders":"","keywords":"Residence; Energy performance; Building code; Benchmark (surveying); Architectural engineering; Code (set theory); Floor plan; Energy (signal processing); Plan (archaeology); Efficient energy use; Civil engineering; Engineering; Computer science; Engineering drawing; Statistics; Mathematics; Geography","score_opus":0.006347113355765993,"score_gpt":0.16792674821574252,"score_spread":0.16157963485997653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2960998055","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9459097,0.00016463932,0.02143674,0.00023190251,0.000014654773,0.00018831869,0.0020491288,0.00007490121,0.029929971],"genre_scores_gemma":[0.98618954,0.00013345113,0.008584655,0.000023698154,0.0000044487824,0.00005876497,0.0012394779,0.00003272373,0.0037331867],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99745363,0.0005943615,0.00009715406,0.00025097674,0.0013602792,0.00024356514],"domain_scores_gemma":[0.9979962,0.0006397934,0.00030475715,0.00023411354,0.00077781884,0.00004732271],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013829654,0.00052220887,0.0003707851,0.0018311301,0.0006421403,0.002475922,0.0013338756,0.0006672633,0.003704612],"category_scores_gemma":[0.0033253187,0.00036303588,0.0008950956,0.0026291807,0.0009192716,0.0018140906,0.0009166263,0.0008031065,0.0006035966],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007909931,0.0016541904,0.3695202,0.0011756093,0.0003590532,0.0017713723,0.004381413,0.369103,0.019433912,0.092773065,0.00660833,0.13242888],"study_design_scores_gemma":[0.00006642817,0.002695016,0.6205952,0.00021817631,0.00014608575,0.0009967719,0.020721817,0.27733603,0.031417158,0.008052107,0.03749602,0.000259136],"about_ca_topic_score_codex":0.05145682,"about_ca_topic_score_gemma":0.07216849,"teacher_disagreement_score":0.05145682,"about_ca_system_score_codex":0.0048053907,"about_ca_system_score_gemma":0.0013052511,"threshold_uncertainty_score":0.10231459},"labels":[],"label_agreement":null},{"id":"W2962985295","doi":"10.35490/ec3.2019.172","title":"Construction progress visualisation for varied stages of the individual elements with BIM: A case study","year":2019,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Schedule; Visualization; Building information modeling; Computer science; Construction management; Critical path method; Plan (archaeology); Process (computing); Systems engineering; Resource (disambiguation); Construct (python library); Facility management; Scheduling (production processes); Project management; Construction engineering; Engineering; Civil engineering; Operations management; Data mining","score_opus":0.018356767750097,"score_gpt":0.2630730913886951,"score_spread":0.2447163236385981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2962985295","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8331114,0.00072623446,0.13221309,0.00085432996,0.00009322807,0.0006370575,0.0015892854,0.0013578279,0.029417576],"genre_scores_gemma":[0.8469255,0.0005299956,0.14315793,0.00005286929,0.000020301604,0.00025292093,0.00075811107,0.00028430385,0.008018123],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99885225,0.00047913633,0.000060302544,0.000118783246,0.00035971485,0.00012979668],"domain_scores_gemma":[0.9978611,0.001258093,0.00015384672,0.0003139952,0.0002534045,0.00015961168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019210314,0.00060778763,0.00038891143,0.0022429288,0.000893306,0.0016277343,0.0012336752,0.0017289328,0.0045517],"category_scores_gemma":[0.0030134977,0.0004936059,0.0008602951,0.002424183,0.0007655867,0.001271404,0.0012407717,0.00085499586,0.00078946794],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001908665,0.0039212247,0.09059013,0.0026557238,0.00015350808,0.04525498,0.038125258,0.20387521,0.06294301,0.03882673,0.024896003,0.48684964],"study_design_scores_gemma":[0.00029034112,0.0015901395,0.088471144,0.00081894046,0.0003405719,0.01827167,0.02877482,0.54642737,0.104929134,0.012264577,0.1973233,0.00049795985],"about_ca_topic_score_codex":0.0051169232,"about_ca_topic_score_gemma":0.01163278,"teacher_disagreement_score":0.0051169232,"about_ca_system_score_codex":0.00083709235,"about_ca_system_score_gemma":0.000882376,"threshold_uncertainty_score":0.01522696},"labels":[],"label_agreement":null},{"id":"W2963803687","doi":"10.35490/ec3.2019.162","title":"Planning and scheduling bridge girders fabrication through shop-floor operations simulation","year":2019,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Computer science; Bridge (graph theory); Modular design; Workflow; Job shop; Production (economics); Production planning; Industrial engineering; Job shop scheduling; Manufacturing engineering; Operations research; Systems engineering; Flow shop scheduling; Engineering; Schedule; Operations management","score_opus":0.018520114141961676,"score_gpt":0.2631673357793539,"score_spread":0.24464722163739225,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2963803687","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21579243,0.000089863104,0.775177,0.00012288593,0.000026873275,0.00022617322,0.00021407973,0.00085367536,0.0074970066],"genre_scores_gemma":[0.8278015,0.00012216774,0.17031802,0.000013399067,0.0000052118608,0.00019382288,0.00029052494,0.00006297893,0.0011923966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995542,0.00019308293,0.000024536881,0.000055090804,0.00009060315,0.00008248087],"domain_scores_gemma":[0.9990376,0.00067124894,0.00006265138,0.00006201993,0.00008113144,0.000085421074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084326486,0.00051905494,0.0005333163,0.0004021071,0.00050573127,0.001053992,0.0008285026,0.00071647094,0.0023897158],"category_scores_gemma":[0.001461542,0.0004292418,0.0005274485,0.00040258904,0.00071624335,0.0005626338,0.00084616937,0.00055267435,0.0002826322],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041361116,0.000032081316,0.0005151912,0.00001929679,0.000006511266,0.00005281386,0.00006874255,0.99072015,0.0008225871,0.0035278227,0.00009845938,0.0040949555],"study_design_scores_gemma":[0.0000075318644,0.00001802637,0.00010022347,0.000002230087,0.00000248317,0.000005253788,0.000035137953,0.9977222,0.0005512937,0.0012643092,0.00028819838,0.0000029706534],"about_ca_topic_score_codex":0.008063353,"about_ca_topic_score_gemma":0.008186265,"teacher_disagreement_score":0.008063353,"about_ca_system_score_codex":0.00076177646,"about_ca_system_score_gemma":0.001988551,"threshold_uncertainty_score":0.016032815},"labels":[],"label_agreement":null},{"id":"W2965227583","doi":"10.1139/cjce-2018-0424","title":"Using the Last Planner System to tackle the social aspects of BIM-enabled MEP coordination","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Process management; CLARITY; Building information modeling; Rework; Accountability; Knowledge management; Action research; Teamwork; Engineering; Engineering management; Computer science; Systems engineering; Operations management; Management","score_opus":0.007582796381624694,"score_gpt":0.18654511435929985,"score_spread":0.17896231797767514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965227583","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06226652,0.00007270798,0.90607285,0.0006752785,0.000088346096,0.00048609986,0.00023809946,0.009782007,0.020318238],"genre_scores_gemma":[0.48225027,0.00009190355,0.5089701,0.0001247366,0.000028743014,0.00041849623,0.00054275093,0.0007519675,0.0068209735],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9970656,0.0013878461,0.00017423574,0.00041937808,0.0007409826,0.00021201061],"domain_scores_gemma":[0.9959443,0.0015905355,0.0004162308,0.0010282906,0.0006622528,0.0003582849],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004700763,0.0010028888,0.0006269842,0.0015760267,0.001393773,0.0025648884,0.0014261554,0.0009987359,0.00574899],"category_scores_gemma":[0.008032328,0.0006196234,0.0005999323,0.0008733206,0.0013230935,0.0039490117,0.0059686373,0.0012966667,0.0011952171],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010709554,0.0012420143,0.026549766,0.0010460356,0.0002789601,0.0018468881,0.019335333,0.17626958,0.050742444,0.08740819,0.016334007,0.61787575],"study_design_scores_gemma":[0.00021526824,0.0006445658,0.0077302954,0.00024061651,0.00018400948,0.0004991937,0.0042667543,0.77804494,0.034228604,0.023858272,0.14983375,0.0002538343],"about_ca_topic_score_codex":0.0068953107,"about_ca_topic_score_gemma":0.00977644,"teacher_disagreement_score":0.0068953107,"about_ca_system_score_codex":0.0012271275,"about_ca_system_score_gemma":0.0039439136,"threshold_uncertainty_score":0.024860322},"labels":[],"label_agreement":null},{"id":"W2965824033","doi":"","title":"Integrated Parcel Maintenance: Trends and Directions","year":2019,"lang":"en","type":"article","venue":"GEOMATICA","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Geography; Cartography; Regional science; Computer science","score_opus":0.004778738992552531,"score_gpt":0.18676127381412175,"score_spread":0.18198253482156923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2965824033","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20893171,0.6429507,0.013722523,0.04842088,0.0009187871,0.00006657836,0.0019032464,0.00071591866,0.08236971],"genre_scores_gemma":[0.69540477,0.27919674,0.0115651805,0.0026583213,0.0007006452,0.00003246552,0.0022154832,0.00008636616,0.008140003],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931526,0.000064857646,0.00005837887,0.00020556363,0.00026694057,0.000088975146],"domain_scores_gemma":[0.9969311,0.0004936637,0.0006211717,0.000097384815,0.0016566276,0.0001999335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015356088,0.00027673354,0.00035125588,0.0022337672,0.00031503898,0.0030333947,0.0011725593,0.00096218183,0.005281058],"category_scores_gemma":[0.0021172322,0.00023199501,0.00022044488,0.0071629477,0.0010281325,0.0042560133,0.0006889484,0.00092113076,0.00096780993],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025853867,0.00025221554,0.046900235,0.0031425904,0.00006890161,0.00014529382,0.001293564,0.0020631074,0.002094212,0.040861074,0.035869572,0.8670507],"study_design_scores_gemma":[0.00003287275,0.0005245839,0.17435108,0.0029604558,0.00018989934,0.0012349087,0.011462,0.010262845,0.0043108137,0.012566202,0.7820227,0.00008157185],"about_ca_topic_score_codex":0.013263924,"about_ca_topic_score_gemma":0.020247107,"teacher_disagreement_score":0.013263924,"about_ca_system_score_codex":0.0023560333,"about_ca_system_score_gemma":0.0017481095,"threshold_uncertainty_score":0.026373386},"labels":[],"label_agreement":null},{"id":"W2967043432","doi":"10.1080/19386362.2019.1655622","title":"Improve the design process of pile foundations using construction control techniques","year":2019,"lang":"en","type":"article","venue":"International Journal of Geotechnical Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Pile; Load testing; Engineering; Process (computing); Control (management); Plan (archaeology); Dynamic load testing; Static analysis; Structural engineering; Civil engineering; Reliability engineering; Computer science","score_opus":0.007398493236170634,"score_gpt":0.23736875133851273,"score_spread":0.2299702581023421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2967043432","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06149137,0.00006775636,0.9345218,0.0000335812,0.000011878944,0.00007403038,0.000015558078,0.0010131745,0.0027707743],"genre_scores_gemma":[0.6646691,0.00013203754,0.3330261,0.000030322937,0.000010016785,0.000077909506,0.00008858345,0.00017681488,0.0017891182],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991073,0.00011705479,0.00004903374,0.00012283135,0.00052139314,0.00008225668],"domain_scores_gemma":[0.9990827,0.00024415704,0.00015608134,0.00013510174,0.0003531457,0.000028813087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008218482,0.0008667735,0.0004980749,0.0014899649,0.00042588238,0.00069297844,0.0006876857,0.00048882345,0.0026007944],"category_scores_gemma":[0.002437479,0.0004829966,0.00065353117,0.000550392,0.00053028454,0.00078343466,0.00061788014,0.00046242168,0.0005732712],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015592975,0.00018271487,0.0037375367,0.00032980266,0.000023226596,0.000283629,0.00031883287,0.4377223,0.2491348,0.0068049897,0.00067418534,0.3006321],"study_design_scores_gemma":[0.000052029576,0.00042155877,0.0030307025,0.000036008023,0.000046197576,0.0002618587,0.00012448723,0.8590247,0.12908778,0.0027899537,0.0050696013,0.000055275705],"about_ca_topic_score_codex":0.0027296552,"about_ca_topic_score_gemma":0.0025190064,"teacher_disagreement_score":0.0027296552,"about_ca_system_score_codex":0.00042612563,"about_ca_system_score_gemma":0.0012041447,"threshold_uncertainty_score":0.00870049},"labels":[],"label_agreement":null},{"id":"W2967842370","doi":"10.1139/cjce-2019-0107","title":"An application framework for development of a maintenance management system based on building information modeling and radio-frequency identification: case study of a stadium building","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Facility management; Radio-frequency identification; Stadium; Building information modeling; Identification (biology); Management system; Computerized maintenance management system; Computer science; The Internet; Workload; Engineering; Systems engineering; Preventive maintenance; Computer security; Reliability engineering; Operations management; World Wide Web","score_opus":0.006821878601667883,"score_gpt":0.201666183574578,"score_spread":0.1948443049729101,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2967842370","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024972644,0.00023563612,0.9567237,0.00028282864,0.000033845783,0.0006265965,0.00025715496,0.00790416,0.008963417],"genre_scores_gemma":[0.16560891,0.00047264705,0.8250367,0.00007756091,0.000015722178,0.00056967384,0.0009061439,0.00051835,0.0067942142],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994548,0.00013907715,0.00005125476,0.00008766619,0.00020578514,0.00006148735],"domain_scores_gemma":[0.9995326,0.00016625869,0.000034129833,0.000071264745,0.00014276954,0.000053106334],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011975795,0.0006591282,0.00045272394,0.0011029546,0.00067912665,0.0014338052,0.001548113,0.0012158384,0.003388585],"category_scores_gemma":[0.00151218,0.00048802057,0.0008654585,0.0006878154,0.0004689852,0.0012561118,0.0012077873,0.0008642903,0.0009253103],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003685304,0.0010656802,0.011613521,0.0018599774,0.00018666143,0.007766131,0.006670984,0.20853215,0.116099484,0.183437,0.021348549,0.44105136],"study_design_scores_gemma":[0.000105019375,0.00031771287,0.003863473,0.0004280283,0.00012979531,0.002557982,0.00069641863,0.75414443,0.033850577,0.015174427,0.1885971,0.00013505062],"about_ca_topic_score_codex":0.008247276,"about_ca_topic_score_gemma":0.008546779,"teacher_disagreement_score":0.99175274,"about_ca_system_score_codex":0.00081603247,"about_ca_system_score_gemma":0.0015208618,"threshold_uncertainty_score":0.01639855},"labels":[],"label_agreement":null},{"id":"W2968234261","doi":"10.5267/j.esm.2019.6.004","title":"Optimization of steel buildings by changing structural system and using lightweight materials","year":2019,"lang":"en","type":"article","venue":"Engineering Solid Mechanics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Materials science; Structural engineering; Computer science; Mechanical engineering; Engineering; Construction engineering","score_opus":0.003306788348041413,"score_gpt":0.17613617268569953,"score_spread":0.17282938433765813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968234261","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9701155,0.00021627451,0.024832452,0.000022511253,0.000012701427,0.000022934766,0.00010275297,0.00012930413,0.004545584],"genre_scores_gemma":[0.98151314,0.00010196352,0.017385086,0.000005608486,0.000002459575,0.0000143817315,0.000113214985,0.000036025707,0.0008282069],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998281,0.000034488403,0.000014445086,0.000026775453,0.00005860088,0.000037568643],"domain_scores_gemma":[0.99985313,0.000021894379,0.00004393091,0.000020669724,0.00004429067,0.000015958254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018560815,0.00054740725,0.00023106388,0.0006046322,0.00019391766,0.00032312085,0.00023919762,0.00017409174,0.0021530658],"category_scores_gemma":[0.00034416348,0.00016001366,0.00025524065,0.00047452576,0.0001457747,0.0002662333,0.00028039297,0.00012911887,0.00048506266],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020383681,0.00020822478,0.012893522,0.00039872923,0.00003795217,0.00015996894,0.00012373779,0.069978796,0.838964,0.0014513812,0.0003948658,0.075185],"study_design_scores_gemma":[0.000089078116,0.0043472974,0.17246597,0.00009800499,0.00042944824,0.0007641802,0.0009534133,0.1470458,0.6438823,0.0020056008,0.027809259,0.000109657536],"about_ca_topic_score_codex":0.000833863,"about_ca_topic_score_gemma":0.004965474,"teacher_disagreement_score":0.0021530658,"about_ca_system_score_codex":0.00017293477,"about_ca_system_score_gemma":0.00022770022,"threshold_uncertainty_score":0.0072027445},"labels":[],"label_agreement":null},{"id":"W2968752924","doi":"","title":"Architectures temporaires pour chantiers de construction éphémères / Temporary Architectures for Ephemeral Construction Sites","year":2014,"lang":"fr","type":"article","venue":"Esse/Esse arts + opinions","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ephemeral key; Computer science; Geology; Computer security","score_opus":0.014339472923837044,"score_gpt":0.24494416494253637,"score_spread":0.23060469201869932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968752924","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06336914,0.00041767012,0.9058226,0.00014072747,0.00014259382,0.00010760867,0.00034757628,0.0015028376,0.028149333],"genre_scores_gemma":[0.46523875,0.0006468067,0.4968618,0.000058571644,0.00006870941,0.00025024015,0.0015868436,0.0009145577,0.034373783],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982851,0.0002678452,0.0001134354,0.0004181505,0.0006516098,0.0002639387],"domain_scores_gemma":[0.9977584,0.000638698,0.0001667683,0.00067683985,0.00058246776,0.00017678797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016554089,0.0009803846,0.00070729037,0.0015964737,0.0019363528,0.006354965,0.0015636054,0.0013632845,0.0116596315],"category_scores_gemma":[0.0040233955,0.00085023796,0.0016133523,0.0012386002,0.0021924826,0.0038977452,0.002756799,0.003654585,0.0029101158],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045794708,0.000118085205,0.0037575928,0.00023387428,0.00007442705,0.0005612225,0.0015804749,0.14648487,0.018405132,0.7097466,0.0038425913,0.114737146],"study_design_scores_gemma":[0.00015035871,0.0002422443,0.0043670544,0.0002450615,0.00010342767,0.0011101658,0.0026750339,0.5759842,0.03363523,0.24476674,0.13650486,0.00021566296],"about_ca_topic_score_codex":0.013863029,"about_ca_topic_score_gemma":0.02307771,"teacher_disagreement_score":0.013863029,"about_ca_system_score_codex":0.0019899209,"about_ca_system_score_gemma":0.0019027893,"threshold_uncertainty_score":0.03900534},"labels":[],"label_agreement":null},{"id":"W2968879609","doi":"10.1139/cjce-2018-0703","title":"Owner requirements in as-built BIM deliverables and a system architecture for FM-specific BIM representation","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Facility management; Task (project management); Deliverable; Computer science; Task management; Systems engineering; Representation (politics); Architecture; Information model; Plan (archaeology); Process management; Engineering; Software engineering; Operations management","score_opus":0.01071361609259655,"score_gpt":0.1997464291636206,"score_spread":0.18903281307102404,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2968879609","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03411066,0.00009979677,0.92375845,0.0009153775,0.00004312392,0.0005656663,0.00081593485,0.006552142,0.033138894],"genre_scores_gemma":[0.3540422,0.00031392684,0.6271327,0.00020274887,0.000028312703,0.0006305124,0.0036202832,0.001049555,0.012979761],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9941239,0.0017041969,0.00049049314,0.000601188,0.0026898228,0.00039046284],"domain_scores_gemma":[0.99624985,0.00077638077,0.00038490965,0.0011910637,0.0012138262,0.00018391747],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007146317,0.00074663037,0.00060710305,0.0031850275,0.0013335968,0.0066125956,0.0024211877,0.0014156218,0.0067971577],"category_scores_gemma":[0.011499387,0.0011963967,0.00066554785,0.0039134347,0.0012451296,0.006712569,0.0042800573,0.0011601787,0.0032042556],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004342665,0.00070362276,0.014638211,0.0007428471,0.00011258575,0.0013738545,0.01134353,0.1741235,0.03417405,0.33460912,0.03318009,0.3945644],"study_design_scores_gemma":[0.00004945411,0.00024362466,0.0077330954,0.00046748164,0.00011604888,0.000951124,0.0051165996,0.7052819,0.031509146,0.06267704,0.18565588,0.00019860546],"about_ca_topic_score_codex":0.008556563,"about_ca_topic_score_gemma":0.008845102,"teacher_disagreement_score":0.008556563,"about_ca_system_score_codex":0.0024393455,"about_ca_system_score_gemma":0.0026436097,"threshold_uncertainty_score":0.037793756},"labels":[],"label_agreement":null},{"id":"W2969409284","doi":"10.18059/jmi.v3i2.43","title":"Associating Knowledge-in-Use with Technology-in-Use While Comparing Building Information Modeling (BIM) in Finland and in Quebec","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal; Université du Québec en Outaouais","funders":"","keywords":"Building information modeling; Knowledge management; Work (physics); Order (exchange); Information technology; Business; Construction industry; Engineering; Computer science; Engineering management; Construction engineering; Operations management","score_opus":0.017730612414635024,"score_gpt":0.22339967010297782,"score_spread":0.2056690576883428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2969409284","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97520304,0.0005464453,0.00043576892,0.00050970167,0.000008000251,0.000049812003,0.00051914627,0.000011874273,0.022716265],"genre_scores_gemma":[0.9982425,0.00013372795,0.00012343269,0.000024900593,0.0000012488755,0.000014829752,0.00019274461,0.0000048990296,0.0012617665],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9942807,0.0011795618,0.0003566431,0.00062457216,0.0019563946,0.0016020619],"domain_scores_gemma":[0.9839914,0.005388766,0.0018960425,0.00051269465,0.006686187,0.0015250234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004231485,0.00033359506,0.0006087222,0.0048911097,0.004632602,0.0067436066,0.0017555043,0.0008303282,0.0027536862],"category_scores_gemma":[0.01543081,0.00025386165,0.00045478562,0.009507238,0.00435467,0.002528178,0.0036955294,0.0011890823,0.00015957485],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002347996,0.00025358854,0.8958251,0.00017259525,0.00012913183,0.0007798988,0.05794982,0.0020053722,0.0005941929,0.0078117843,0.0014851224,0.032758612],"study_design_scores_gemma":[0.000009489467,0.000051181458,0.90519834,0.00016495837,0.000057926714,0.000102831444,0.08312153,0.0022068534,0.0005166937,0.00029946544,0.008221912,0.000048773694],"about_ca_topic_score_codex":0.97962475,"about_ca_topic_score_gemma":0.9866992,"teacher_disagreement_score":0.057946622,"about_ca_system_score_codex":0.057946622,"about_ca_system_score_gemma":0.031678487,"threshold_uncertainty_score":0.42043412},"labels":[],"label_agreement":null},{"id":"W2970484310","doi":"10.29173/aar56","title":"A Walk Through the City of Edmonton","year":2019,"lang":"en","type":"article","venue":"Alberta Academic Review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Architecture; Multidisciplinary approach; Engineering; Work (physics); Downtown; Engineering management; Geomatics; Statement of work; Architectural engineering; Civil engineering; Construction engineering; Computer science; Mechanical engineering; Geography","score_opus":0.01448575639864925,"score_gpt":0.2538665778529669,"score_spread":0.23938082145431766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970484310","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42017546,0.020602189,0.0020521209,0.045709524,0.005029574,0.00046535986,0.0026496714,0.0006230131,0.50269324],"genre_scores_gemma":[0.4136472,0.008510187,0.0054679876,0.010988913,0.00046748883,0.00021875036,0.0014657514,0.0003123781,0.5589214],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994804,0.000104741936,0.0000050182666,0.00006534653,0.000097709206,0.00024676652],"domain_scores_gemma":[0.9994455,0.000051770294,0.000020584946,0.000018069843,0.000087639964,0.0003763944],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060399796,0.000809759,0.0004260598,0.0010382121,0.020038282,0.003054565,0.0011458063,0.0017908197,0.036771037],"category_scores_gemma":[0.0006733753,0.00068105326,0.0002774119,0.0010046432,0.0019063335,0.0012515248,0.004960762,0.0026539478,0.0032204832],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039753,0.0005063775,0.013379642,0.00076944206,0.000073726194,0.02993054,0.23203827,0.0011038863,0.0072092344,0.022518229,0.56863946,0.12343361],"study_design_scores_gemma":[0.000012412328,0.00009218901,0.028718663,0.00036281196,0.000010727028,0.0010866515,0.10613082,0.000079736164,0.00022715997,0.0006300838,0.86258954,0.000059330716],"about_ca_topic_score_codex":0.4514816,"about_ca_topic_score_gemma":0.8359949,"teacher_disagreement_score":0.5485184,"about_ca_system_score_codex":0.0068662195,"about_ca_system_score_gemma":0.00785944,"threshold_uncertainty_score":0.8977074},"labels":[],"label_agreement":null},{"id":"W2970787930","doi":"10.35199/epde2019","title":"DS 95: Proceedings of the 21st International Conference on Engineering and Product Design Education (E&amp;PDE 2019), University of Strathclyde, Glasgow. 12th -13th September 2019","year":2019,"lang":"en","type":"paratext","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Nottingham Ningbo China; City, University of London; Indian Institute of Technology Guwahati; Universidade Federal do Rio de Janeiro; Technische Universiteit Delft; Åbo Akademi; Trent University; Universidade Federal do Rio Grande do Sul; Università della Calabria; Bulgarian Academy of Sciences; Brigham Young University; University of Waterloo; RWTH Aachen University; Loughborough University; Universiti Teknologi Malaysia; Instituto Tecnológico y de Estudios Superiores de Monterrey; Aston University; Aalborg Universitet; Edith Cowan University; Universidade de São Paulo; Royal College of Art; University of Nottingham; University of Bristol; University of Bath; Høgskolen i Oslo og Akershus; University of Derby; Cardiff Metropolitan University; University of Dammam; University of Leeds; Bucks New University; Technische Universität Clausthal; University of Brighton; Nottingham Trent University; Imperial College London; Liverpool John Moores University; Oklahoma State University; Universidad de San Buenaventura; Robert Gordon University; University of Hertfordshire; Ariel University; De Montfort University; Universität des Saarlandes; Bournemouth University; Arts University Bournemouth; Blekinge Tekniska Högskola; Coventry University; Dalian University of Technology; North Carolina State University; Norges Teknisk-Naturvitenskapelige Universitet; Arizona State University; London South Bank University; Northumbria University; Università Politecnica delle Marche; Universidad Pontificia Bolivariana; Sveučilište u Zagrebu","keywords":"Engineering; Product design; Library science; Engineering education; Product (mathematics); Management; Institution; Engineering management; Sociology; Computer science; Mathematics; Social science","score_opus":0.014885064746818754,"score_gpt":0.20920906147499382,"score_spread":0.19432399672817507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970787930","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02466187,0.054678954,0.077449344,0.0442702,0.05523458,0.0006833567,0.00986844,0.008992832,0.72416043],"genre_scores_gemma":[0.03032256,0.013830152,0.011094213,0.0013423646,0.0015754099,0.00024310198,0.011115129,0.0016508847,0.92882615],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99757165,0.00059134624,0.00014315044,0.00026807556,0.0012315913,0.00019423579],"domain_scores_gemma":[0.99695504,0.0006156478,0.000074678646,0.00029867358,0.0011212279,0.0009347691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003444164,0.0009737882,0.00084531354,0.0016966898,0.0011849626,0.007305343,0.0014564146,0.0014480719,0.1466427],"category_scores_gemma":[0.004091746,0.00039174067,0.00039797914,0.0017912188,0.001522215,0.0035103022,0.0035533363,0.0020657543,0.045360584],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008390355,0.000060862447,0.00038225987,0.00025926763,0.000009490156,0.00010767123,0.0005847279,0.00027140998,0.0013086066,0.009303518,0.8549928,0.1326356],"study_design_scores_gemma":[0.000005007288,0.000019251618,0.00064521265,0.000059076763,0.0000035815178,0.00004834902,0.00016871233,0.00015796318,0.0003567994,0.00079399906,0.99773717,0.0000048937577],"about_ca_topic_score_codex":0.014612922,"about_ca_topic_score_gemma":0.03029665,"teacher_disagreement_score":0.1466427,"about_ca_system_score_codex":0.0043276334,"about_ca_system_score_gemma":0.005166067,"threshold_uncertainty_score":0.4905687},"labels":[],"label_agreement":null},{"id":"W2970844161","doi":"10.1061/9780784482308.001","title":"A Framework for the Contract Management System in Cloud-Based ERP for SMEs in the Construction Industry","year":2019,"lang":"en","type":"article","venue":"ICCREM 2019","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Cloud computing; Business; Enterprise resource planning; Contract management; Construction industry; Process management; Industrial organization; Computer science; Engineering; Construction engineering; Operating system; Marketing","score_opus":0.009959230430971109,"score_gpt":0.22998827360710591,"score_spread":0.2200290431761348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2970844161","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006168028,0.00037615112,0.980467,0.00092888734,0.00008994902,0.00068900693,0.00012661687,0.00073715183,0.010417326],"genre_scores_gemma":[0.14368998,0.00088065007,0.847201,0.00027126822,0.000065364045,0.0010776632,0.00039803179,0.00014108338,0.006275011],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983386,0.0006208766,0.00021398396,0.00020859332,0.00044484166,0.00017309246],"domain_scores_gemma":[0.99940693,0.00015635864,0.00006313696,0.00008634359,0.00018461347,0.00010257203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00279096,0.0004810798,0.00049865467,0.0011365819,0.0014490437,0.004268587,0.00228937,0.0022686557,0.0024600143],"category_scores_gemma":[0.001965533,0.0005567107,0.0013354523,0.0010754818,0.001290029,0.0024854098,0.0031641661,0.0017814212,0.0009203026],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006375943,0.00021701258,0.0015326054,0.00037319856,0.000053941687,0.0022263068,0.0022187622,0.06202391,0.008277604,0.8549109,0.0062624677,0.061839633],"study_design_scores_gemma":[0.00005993316,0.00013387027,0.001244613,0.0005485141,0.00007997892,0.0012353419,0.0012491959,0.7445677,0.0042457855,0.08913649,0.15737672,0.00012182495],"about_ca_topic_score_codex":0.011998269,"about_ca_topic_score_gemma":0.011750651,"teacher_disagreement_score":0.011998269,"about_ca_system_score_codex":0.0015982257,"about_ca_system_score_gemma":0.0041114287,"threshold_uncertainty_score":0.023856878},"labels":[],"label_agreement":null},{"id":"W2971031665","doi":"","title":"A Cloud-Based Architecture for BIM as an Asset for Project Management","year":2019,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cloud computing; Architecture; Asset management; Systems engineering; Engineering management; Asset (computer security); Computer science; Engineering; Data science; Software engineering; Construction engineering; Business; Operating system; Computer security; Geography; Finance","score_opus":0.008258892364082398,"score_gpt":0.20875585355414897,"score_spread":0.20049696119006657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971031665","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004428466,0.0006255656,0.97057223,0.0011501918,0.00018252732,0.00026148948,0.0010408057,0.0065404805,0.015198215],"genre_scores_gemma":[0.10154304,0.0015475313,0.8821914,0.00039546005,0.00010179614,0.00040604256,0.0037440744,0.0008425192,0.0092281485],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99843866,0.00035911132,0.00016070357,0.0002529944,0.00061851984,0.00016997832],"domain_scores_gemma":[0.9988728,0.00012592143,0.000079694044,0.0004256525,0.00030257466,0.00019333279],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001644917,0.00070635346,0.000848179,0.0022207724,0.0019383543,0.0063582603,0.0037308624,0.0015951693,0.0076600946],"category_scores_gemma":[0.0022445142,0.0007581876,0.0014558135,0.004715927,0.00092652254,0.0045613893,0.00528392,0.0018880283,0.0056520454],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027264698,0.00041186195,0.003759103,0.00048667655,0.00020580288,0.0007172373,0.0016227775,0.12567405,0.012570961,0.31555894,0.08438289,0.45433697],"study_design_scores_gemma":[0.000038993945,0.00007698281,0.0018116351,0.0002443561,0.00007330369,0.00044472917,0.0006598591,0.5698987,0.004602798,0.11469949,0.30732876,0.00012032213],"about_ca_topic_score_codex":0.018419528,"about_ca_topic_score_gemma":0.02444045,"teacher_disagreement_score":0.018419528,"about_ca_system_score_codex":0.0025769693,"about_ca_system_score_gemma":0.0028000788,"threshold_uncertainty_score":0.03662467},"labels":[],"label_agreement":null},{"id":"W2971142046","doi":"10.5539/ies.v12n9p70","title":"Establishing the Architectural Talents Cultivating System of Practice and Innovation Ability Under the Background of New Engineering","year":2019,"lang":"en","type":"article","venue":"International Education Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Architecture; Engineering management; Face (sociological concept); Field (mathematics); Architectural technology; Engineering; Key (lock); Engineering education; Teaching method; Knowledge management; Architectural engineering; Computer science; Construction engineering; Mathematics education; Operations management; Sociology","score_opus":0.028498780771223038,"score_gpt":0.3131834280686336,"score_spread":0.28468464729741055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971142046","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45057356,0.0018109193,0.06798866,0.013988413,0.0006258943,0.00082389556,0.00009620027,0.0006535152,0.46343893],"genre_scores_gemma":[0.86269915,0.0016955455,0.05959093,0.001258475,0.00024231683,0.00032559378,0.000106317486,0.00010390696,0.073977776],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99800116,0.0005067982,0.00007990923,0.00025363686,0.00072109513,0.0004374214],"domain_scores_gemma":[0.9960514,0.00043886315,0.00025523553,0.0003470258,0.0010655423,0.0018419165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029265594,0.00038236956,0.00027813436,0.0013868172,0.002513018,0.005485366,0.0006804328,0.00082558,0.0073207854],"category_scores_gemma":[0.0038835006,0.00028707896,0.0004356046,0.0007757151,0.002585424,0.0030864726,0.0042137527,0.0018326209,0.0026960736],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007045135,0.0014544714,0.05273986,0.0008286001,0.00006542803,0.0012791045,0.049059656,0.002242739,0.033429306,0.32408762,0.041845717,0.49289712],"study_design_scores_gemma":[0.000067420624,0.0006428117,0.089308195,0.0007298547,0.00009365006,0.0018667814,0.035783835,0.0071988963,0.011088462,0.14618054,0.7068958,0.00014369753],"about_ca_topic_score_codex":0.0011390896,"about_ca_topic_score_gemma":0.0024111439,"teacher_disagreement_score":0.0073207854,"about_ca_system_score_codex":0.001340434,"about_ca_system_score_gemma":0.006005622,"threshold_uncertainty_score":0.024490476},"labels":[],"label_agreement":null},{"id":"W2971588297","doi":"10.11575/prism/32372","title":"Regional Transportation Infrastructure Project Prioritization: The Calgary Region Part A Report","year":2017,"lang":"en","type":"article","venue":"Open MIND","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Prioritization; Environmental planning; Transportation infrastructure; Business; Transport infrastructure; Regional science; Transport engineering; Environmental resource management; Geography; Engineering; Process management; Environmental science","score_opus":0.03375908893183913,"score_gpt":0.277078303971617,"score_spread":0.24331921503977785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2971588297","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41278577,0.0057880017,0.048382696,0.021626115,0.0017016459,0.018041508,0.04994746,0.003801947,0.43792483],"genre_scores_gemma":[0.53284216,0.0057750223,0.16200374,0.004081645,0.0001928129,0.009937542,0.059728492,0.001475877,0.22396268],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99080956,0.0011277063,0.00035659154,0.0006848487,0.0051508876,0.0018703581],"domain_scores_gemma":[0.9876611,0.00096135965,0.00073440315,0.00053632143,0.0084683765,0.0016384164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010147679,0.001054696,0.0006519678,0.006258558,0.004338106,0.0057417634,0.0019741575,0.0012520977,0.01324454],"category_scores_gemma":[0.010292293,0.00077398913,0.000630105,0.0062283454,0.0006530343,0.0013158771,0.0035643699,0.0021928155,0.0023654995],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006495317,0.00094626436,0.0636862,0.0020315973,0.00018994683,0.0029890286,0.01199475,0.017754888,0.01871515,0.019462965,0.41064897,0.45093066],"study_design_scores_gemma":[0.00017595215,0.0006369919,0.27090675,0.0013770249,0.00013233017,0.0004804884,0.02779216,0.005174529,0.016683329,0.00457262,0.6718433,0.00022442898],"about_ca_topic_score_codex":0.57038605,"about_ca_topic_score_gemma":0.67449456,"teacher_disagreement_score":0.9726186,"about_ca_system_score_codex":0.027381409,"about_ca_system_score_gemma":0.091379225,"threshold_uncertainty_score":0.8642881},"labels":[],"label_agreement":null},{"id":"W2973020604","doi":"10.1504/ijpqm.2020.10023977","title":"Modeling Construction labour productivity using Evolutionary Polynomial Regression","year":2019,"lang":"en","type":"article","venue":"International Journal of Productivity and Quality Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Productivity; Schedule; Interdependence; Artificial neural network; Regression analysis; Evolutionary algorithm; Engineering; Regression; Industrial engineering; Econometrics; Computer science; Economics; Statistics; Mathematics; Machine learning","score_opus":0.024468356726526332,"score_gpt":0.2769901287661152,"score_spread":0.25252177203958887,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2973020604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.53330433,0.000260458,0.4604605,0.00021248314,0.00002859697,0.000069914575,0.0003129758,0.00027990725,0.0050708465],"genre_scores_gemma":[0.98157114,0.00013859409,0.016158957,0.0000100012,0.0000059826666,0.000041619565,0.00011852026,0.000020244852,0.0019349487],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996443,0.000106867774,0.000016066202,0.000092931165,0.00008009242,0.00005977413],"domain_scores_gemma":[0.9992887,0.00043916143,0.000106063526,0.000031726187,0.000115261384,0.000019050703],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007588736,0.0005889202,0.00037902378,0.0007640892,0.00019148224,0.0007020633,0.00080448715,0.00068496633,0.0011459766],"category_scores_gemma":[0.0024127983,0.00023954292,0.00065364264,0.0012510557,0.0002257056,0.00050227303,0.0004849436,0.0004996003,0.00021212429],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017433164,0.000028507167,0.0032191635,0.000020795811,0.000016455924,0.00003801407,0.000028303646,0.98261017,0.0007478116,0.00061494793,0.00007408434,0.012584198],"study_design_scores_gemma":[9.264398e-7,0.000007945959,0.0008324976,0.0000014339745,0.000002538986,0.0000048839993,0.000005924933,0.9987815,0.00013060411,0.0001646087,0.00006487168,0.000002246148],"about_ca_topic_score_codex":0.015339982,"about_ca_topic_score_gemma":0.009201846,"teacher_disagreement_score":0.015339982,"about_ca_system_score_codex":0.000703385,"about_ca_system_score_gemma":0.0006622214,"threshold_uncertainty_score":0.030501366},"labels":[],"label_agreement":null},{"id":"W2974593349","doi":"","title":"Framework for life-cycle infrastructure information modeling and management","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Process management; Business","score_opus":0.004857091498580967,"score_gpt":0.1909660981547585,"score_spread":0.18610900665617755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974593349","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006186149,0.00012140461,0.9930999,0.000220844,0.000033016444,0.00014633093,0.0006144128,0.0018143883,0.0033310421],"genre_scores_gemma":[0.042051088,0.0005693131,0.9497888,0.00014146128,0.000036837293,0.00055073627,0.00281592,0.0003784372,0.0036674214],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9980799,0.00041942913,0.0003043514,0.00026314985,0.0007504966,0.00018261248],"domain_scores_gemma":[0.9985507,0.0003410128,0.000101274054,0.00042749938,0.00045756515,0.00012185276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032845298,0.0014130655,0.0012658072,0.003970327,0.001467952,0.0061476026,0.0045659295,0.0020097233,0.0061203525],"category_scores_gemma":[0.004414837,0.0010444899,0.0028228853,0.0034320657,0.0012648592,0.0041549946,0.003396007,0.0024439145,0.003912736],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032025535,0.0001446204,0.0010104155,0.00028893616,0.00015816677,0.00028933957,0.0003378958,0.1330964,0.0015829677,0.7744038,0.012126866,0.07652853],"study_design_scores_gemma":[0.000018981358,0.000022262975,0.0002409286,0.00020429256,0.00009829745,0.00018287728,0.00017647116,0.63678056,0.0027160489,0.24788195,0.11162268,0.000054634074],"about_ca_topic_score_codex":0.028346121,"about_ca_topic_score_gemma":0.03352723,"teacher_disagreement_score":0.028346121,"about_ca_system_score_codex":0.0030413452,"about_ca_system_score_gemma":0.0059430297,"threshold_uncertainty_score":0.05636227},"labels":[],"label_agreement":null},{"id":"W2974685136","doi":"10.1080/15623599.2019.1661572","title":"Integrating an expert system with BrIMS, cost estimation, and linear scheduling at conceptual design stage of bridge projects","year":2019,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Cost estimate; Bridge (graph theory); Computer science; Scheduling (production processes); Conceptual design; Interoperability; Decision support system; Software deployment; Operations research; Systems engineering; Industrial engineering; Engineering; Software engineering; Data mining; Operations management","score_opus":0.019171946870997107,"score_gpt":0.2499096707881216,"score_spread":0.2307377239171245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2974685136","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041003764,0.00006626134,0.94444036,0.00019782943,0.000040775034,0.0003239204,0.00025271735,0.008580848,0.0050935005],"genre_scores_gemma":[0.3591614,0.00011239402,0.63496333,0.000113408154,0.000046459863,0.00040567614,0.00059226836,0.00015156525,0.004453465],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99842536,0.0004931477,0.00020715609,0.00031284467,0.00045959474,0.000102056896],"domain_scores_gemma":[0.9975097,0.000999374,0.00021676152,0.00047655005,0.0006659669,0.00013169083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031640653,0.0005897077,0.0006599416,0.0014434549,0.00046671813,0.0017710625,0.0011242449,0.0008498029,0.0050466713],"category_scores_gemma":[0.005797022,0.00035534782,0.00043994925,0.0007545412,0.00026180764,0.0012682435,0.0010428434,0.0006768749,0.0015272894],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008439557,0.0009259472,0.0063598347,0.0003963796,0.00014147672,0.0005763088,0.0010611886,0.15548153,0.039238594,0.014771608,0.007758253,0.77244484],"study_design_scores_gemma":[0.00011152788,0.00024366431,0.0030467224,0.00006912123,0.00011565388,0.00016295476,0.0002952838,0.9485166,0.022240367,0.008651162,0.016478792,0.00006815131],"about_ca_topic_score_codex":0.002658091,"about_ca_topic_score_gemma":0.002211261,"teacher_disagreement_score":0.0050466713,"about_ca_system_score_codex":0.00068109325,"about_ca_system_score_gemma":0.0017744976,"threshold_uncertainty_score":0.016882777},"labels":[],"label_agreement":null},{"id":"W2975132213","doi":"10.1061/(asce)cp.1943-5487.0000862","title":"Bayesian Inference with Markov Chain Monte Carlo–Based Numerical Approach for Input Model Updating","year":2019,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Markov chain Monte Carlo; Randomness; Stochastic simulation; Bayesian inference; Monte Carlo method; Probability distribution; Discrete event simulation; Markov chain; Inference; Bayesian probability; Data mining; Mathematical optimization; Machine learning; Artificial intelligence; Simulation; Mathematics; Statistics","score_opus":0.006382082863049515,"score_gpt":0.20018570175580216,"score_spread":0.19380361889275266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2975132213","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001462729,0.00004634053,0.99774677,0.000049180337,0.000012044346,0.000017871302,0.000020367263,0.00015087392,0.0004938339],"genre_scores_gemma":[0.29289132,0.0003404313,0.7037671,0.00016753987,0.000097499666,0.00041529402,0.00033749596,0.00018637239,0.0017969178],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99799454,0.00092803244,0.00012106289,0.00029508607,0.00054774806,0.000113549024],"domain_scores_gemma":[0.99407023,0.0042853802,0.0004249736,0.00035060794,0.0007630654,0.000105810526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036487475,0.00089669536,0.0014960258,0.0017794195,0.00081675086,0.0016316714,0.0024098079,0.0012972683,0.0032376554],"category_scores_gemma":[0.015950968,0.0010500897,0.0011462588,0.0016276055,0.0011471295,0.0018161088,0.0015950098,0.0024840438,0.00061020255],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036800313,0.00004020173,0.0007470436,0.00006796984,0.000046176818,0.000040254516,0.000064163985,0.9386739,0.0005820656,0.029181365,0.00049067783,0.03002931],"study_design_scores_gemma":[0.0000035636133,0.0000036343426,0.000035903115,0.000005490327,0.0000039531847,0.0000054886987,0.000002569184,0.9943374,0.00013957148,0.0052054524,0.0002524504,0.000004600378],"about_ca_topic_score_codex":0.015619626,"about_ca_topic_score_gemma":0.015588711,"teacher_disagreement_score":0.015619626,"about_ca_system_score_codex":0.0015216056,"about_ca_system_score_gemma":0.0033932212,"threshold_uncertainty_score":0.031057417},"labels":[],"label_agreement":null},{"id":"W2977620183","doi":"10.1007/978-3-030-30949-7_14","title":"Automating the Integration of 4D Models in Game Engines for a Virtual Reality-Based Construction Simulation","year":2019,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Workflow; Schedule; Process (computing); Constructability; Software engineering; Game engine; Virtual reality; Software; Work (physics); Human–computer interaction; Systems engineering; Database","score_opus":0.022622889016887245,"score_gpt":0.24836560073700165,"score_spread":0.2257427117201144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2977620183","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04861854,0.000098260396,0.932167,0.00006149488,0.00006498035,0.00023207882,0.00027746413,0.010426446,0.008053729],"genre_scores_gemma":[0.37817684,0.00022886824,0.60604054,0.000076286975,0.000010596051,0.0002752904,0.0013391674,0.0020611526,0.011791304],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993305,0.00007930204,0.000043312433,0.000112444766,0.0003576254,0.00007680802],"domain_scores_gemma":[0.9996238,0.00014014193,0.000023961788,0.00009552503,0.00008856909,0.000028050606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005238416,0.001498047,0.0010634952,0.0009197749,0.0004239284,0.0017365434,0.002079837,0.0010015855,0.01050388],"category_scores_gemma":[0.0014845647,0.0014721538,0.001435714,0.00056682277,0.0004166708,0.0011488638,0.003069179,0.00083937636,0.0034801501],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006484591,0.00069965335,0.0038292948,0.00052834215,0.00022295908,0.00074685755,0.0013351953,0.35513875,0.1322596,0.016832523,0.008252929,0.47950536],"study_design_scores_gemma":[0.00003236652,0.000095286116,0.0010543969,0.000044410564,0.00006474245,0.00019264265,0.00012504273,0.92638534,0.052508794,0.0028097269,0.01663483,0.000052450992],"about_ca_topic_score_codex":0.005624835,"about_ca_topic_score_gemma":0.006119787,"teacher_disagreement_score":0.01050388,"about_ca_system_score_codex":0.00055810827,"about_ca_system_score_gemma":0.0007975484,"threshold_uncertainty_score":0.035139024},"labels":[],"label_agreement":null},{"id":"W2978270781","doi":"10.1007/978-3-030-30949-7_16","title":"Implementing Mobile Technology on Construction Sites: An Ethnographic Action Research Approach","year":2019,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Action (physics); Work (physics); Ethnography; Action research; Knowledge management; Building information modeling; Preference; Information technology; Engineering management; Process management; Business; Management; Operations management; Engineering; Sociology","score_opus":0.04531371501625905,"score_gpt":0.3089224841253742,"score_spread":0.2636087691091152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978270781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9086455,0.00042486197,0.051985577,0.0006882144,0.00004323936,0.0030951535,0.00035744294,0.00009410252,0.034665946],"genre_scores_gemma":[0.94129646,0.0005999153,0.049414396,0.00019609151,0.000010503037,0.002136449,0.00013054106,0.00006262449,0.0061530205],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9832683,0.013299305,0.000452056,0.0009077719,0.0010906089,0.0009819445],"domain_scores_gemma":[0.97829425,0.018285802,0.0007097706,0.0011437389,0.0011872536,0.00037926665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013223289,0.0012666791,0.0007216735,0.0032255522,0.0069184215,0.00525932,0.0024251265,0.0025466671,0.004511454],"category_scores_gemma":[0.01583017,0.0010588398,0.00056701404,0.0036382645,0.00647429,0.0052683363,0.0056882934,0.0023401615,0.0005812232],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018422226,0.001415001,0.01273182,0.0011876957,0.000038675524,0.0011988382,0.86653084,0.001779444,0.008025521,0.012827041,0.0012089734,0.09287197],"study_design_scores_gemma":[0.00008523291,0.0012401646,0.010952178,0.0010644516,0.0000866322,0.0006206532,0.9533999,0.0024341748,0.0071195243,0.004074583,0.018838573,0.00008399003],"about_ca_topic_score_codex":0.0051064347,"about_ca_topic_score_gemma":0.015040855,"teacher_disagreement_score":0.013223289,"about_ca_system_score_codex":0.0034916026,"about_ca_system_score_gemma":0.004386668,"threshold_uncertainty_score":0.06993228},"labels":[],"label_agreement":null},{"id":"W2978753974","doi":"10.22260/isarc2019/0026","title":"Identification of the Structural State in Automated Modular Construction","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Identification (biology); Modular design; Computer science; Frame (networking); Scope (computer science); State (computer science); Strain gauge; Artificial intelligence; Machine learning; Accelerometer; Reliability engineering; Engineering; Programming language; Structural engineering","score_opus":0.0033597052930829465,"score_gpt":0.1863410040561371,"score_spread":0.18298129876305416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2978753974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71406627,0.000101297795,0.28387907,0.000044370536,0.000009245757,0.000044363085,0.000070701884,0.00057956413,0.0012050619],"genre_scores_gemma":[0.98308265,0.000023453227,0.016526503,0.0000029123103,0.0000021141307,0.00001646954,0.000045821464,0.00000856709,0.00029148057],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995617,0.00013531718,0.000015004044,0.000088417,0.0001561821,0.000043352626],"domain_scores_gemma":[0.9989096,0.0005523158,0.00023513594,0.000088461085,0.0001779745,0.000036396363],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004702498,0.00035225015,0.0004160203,0.00078248675,0.00018989766,0.0003971567,0.00043762737,0.00039734982,0.00073738326],"category_scores_gemma":[0.0018196236,0.0002645073,0.00023848418,0.00045299547,0.0004001891,0.00043201662,0.00060244085,0.0002555324,0.0001836504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000686596,0.00024685758,0.022630269,0.0001763267,0.00006161463,0.00031921305,0.00065046037,0.5264709,0.08353427,0.0023295777,0.00061401085,0.36227992],"study_design_scores_gemma":[0.0000072031207,0.00015246775,0.011981521,0.000007970589,0.000007686542,0.000050981736,0.00007261683,0.9790283,0.0073544956,0.0011148818,0.00020898145,0.000012877448],"about_ca_topic_score_codex":0.00222116,"about_ca_topic_score_gemma":0.002413355,"teacher_disagreement_score":0.00222116,"about_ca_system_score_codex":0.00041181003,"about_ca_system_score_gemma":0.00030443678,"threshold_uncertainty_score":0.0044164658},"labels":[],"label_agreement":null},{"id":"W2979275617","doi":"10.29173/aar70","title":"Using Computer Simulations to Plan Construction Projects Accurately","year":2019,"lang":"en","type":"article","venue":"Alberta Academic Review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Integrated project delivery; Plan (archaeology); Project planning; Computer science; Work (physics); Quality (philosophy); Duration (music); Operations research; Construction management; Project management; Construction engineering; Transport engineering; Engineering; Civil engineering; Systems engineering","score_opus":0.06837778238064965,"score_gpt":0.31301317225809505,"score_spread":0.2446353898774454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979275617","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12356516,0.00045375407,0.83305013,0.0004840016,0.00013114704,0.00053494726,0.0009222936,0.0022395402,0.03861909],"genre_scores_gemma":[0.64178145,0.00072965695,0.34724206,0.00009432198,0.000027089964,0.0009736079,0.0011823527,0.0003713954,0.0075980537],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992324,0.00030329154,0.000059304715,0.00010246975,0.00023025635,0.00007229697],"domain_scores_gemma":[0.9967969,0.0022764667,0.00020065455,0.0002666386,0.00036643585,0.00009281053],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011152746,0.00096958154,0.0008427459,0.0009440347,0.000649385,0.0017739572,0.001188219,0.001190008,0.0051958365],"category_scores_gemma":[0.0051308605,0.0011794217,0.00079273817,0.0012588444,0.00074658694,0.0014763873,0.0009049023,0.0012225524,0.00058542803],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000082514225,0.000008115784,0.00022480157,0.000011829834,0.000005556368,0.0000112172365,0.000016982503,0.9964064,0.00010379716,0.0014543987,0.00010860953,0.0016400332],"study_design_scores_gemma":[0.000012070989,0.000010456557,0.00007787736,0.000009998586,0.0000045767656,0.0000059478557,0.000022279834,0.996424,0.0002129484,0.0019412885,0.0012730084,0.0000055890605],"about_ca_topic_score_codex":0.033211533,"about_ca_topic_score_gemma":0.029230842,"teacher_disagreement_score":0.033211533,"about_ca_system_score_codex":0.0020050749,"about_ca_system_score_gemma":0.0026848172,"threshold_uncertainty_score":0.06603646},"labels":[],"label_agreement":null},{"id":"W2979441038","doi":"10.1109/fuzz-ieee.2019.8858820","title":"Feature Selection for Construction Organizational Competencies Impacting Performance","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Curse of dimensionality; Feature selection; Computer science; Cluster analysis; Data mining; Fuzzy set; Fitness function; Feature (linguistics); Artificial intelligence; Fuzzy logic; Mean squared error; Machine learning; Genetic algorithm; Mathematics; Statistics","score_opus":0.0037695019693893173,"score_gpt":0.17458410425990722,"score_spread":0.1708146022905179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979441038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7828894,0.0004151809,0.21252514,0.00037180143,0.000043686945,0.00012139419,0.00055918144,0.0006758831,0.0023983375],"genre_scores_gemma":[0.9815315,0.00003602913,0.017789982,0.00001329273,0.000007378677,0.000039824965,0.0003192946,0.000012284239,0.00025040266],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993524,0.00022451891,0.000049240927,0.000096969045,0.00018447562,0.000092482805],"domain_scores_gemma":[0.99800116,0.0011743244,0.00017390496,0.000097670156,0.00048847374,0.000064394066],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014822863,0.00063138275,0.0006319872,0.0021451244,0.00040840774,0.0009073535,0.0004291958,0.0005792403,0.0015204548],"category_scores_gemma":[0.004955798,0.00015192869,0.00072662113,0.0014165713,0.00027874013,0.0005068045,0.00044825065,0.00036560342,0.00020141165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010142269,0.00082326576,0.11522808,0.00020140891,0.00038457479,0.00034524253,0.00018142894,0.38853982,0.021220269,0.002136992,0.0029832283,0.4669415],"study_design_scores_gemma":[0.000027753835,0.0002698117,0.041104224,0.000023381126,0.00007340802,0.00008361772,0.00012656389,0.95037377,0.0060824403,0.0012885001,0.0005207779,0.000025836503],"about_ca_topic_score_codex":0.0047687185,"about_ca_topic_score_gemma":0.0031868704,"teacher_disagreement_score":0.0047687185,"about_ca_system_score_codex":0.00070945127,"about_ca_system_score_gemma":0.00086740224,"threshold_uncertainty_score":0.0094819665},"labels":[],"label_agreement":null},{"id":"W2979793080","doi":"10.1016/j.jclepro.2019.118758","title":"Stochastic-based noise exposure assessment in modular and off-site construction","year":2019,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Noise (video); Noise exposure; Productivity; Risk analysis (engineering); Noise control; Construction industry; Factory (object-oriented programming); Engineering; Computer science; Construction engineering; Business; Noise reduction; Artificial intelligence; Medicine","score_opus":0.004323462391661307,"score_gpt":0.2013059711858827,"score_spread":0.19698250879422138,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2979793080","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9115177,0.00006567875,0.08625194,0.000023894947,0.000010004699,0.000015881938,0.0001280742,0.00011031003,0.0018764674],"genre_scores_gemma":[0.99502426,0.000031876785,0.0043759835,0.0000039105207,0.0000026335945,0.000008162951,0.00014665475,0.000011986729,0.00039454468],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992931,0.00016659148,0.000024170784,0.00013262806,0.00030224447,0.00008120724],"domain_scores_gemma":[0.9992723,0.00031569705,0.00009533312,0.000060285056,0.00021993036,0.00003648998],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008698869,0.0005474558,0.0005614183,0.00094323134,0.00022290421,0.00087987364,0.0005858216,0.00059134443,0.00072733476],"category_scores_gemma":[0.001686021,0.0002837002,0.00055890327,0.0007459689,0.00033638228,0.00059938815,0.00078105787,0.00027325988,0.0001978502],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006172434,0.00029954317,0.06124594,0.00010391853,0.00011491876,0.00015129779,0.00019991964,0.8472756,0.026132977,0.0013615242,0.00029901273,0.062197994],"study_design_scores_gemma":[0.000006692626,0.00016603434,0.044341646,0.000010524451,0.000045259512,0.000065414424,0.00010666444,0.94913137,0.0051398757,0.0007103686,0.00025667044,0.000019462903],"about_ca_topic_score_codex":0.003845206,"about_ca_topic_score_gemma":0.006068361,"teacher_disagreement_score":0.003845206,"about_ca_system_score_codex":0.00049628544,"about_ca_system_score_gemma":0.0005762327,"threshold_uncertainty_score":0.0076456666},"labels":[],"label_agreement":null},{"id":"W2980846909","doi":"10.1139/cjce-2018-0415","title":"Building information modeling and field operations: opportunities and challenges","year":2019,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Field (mathematics); Plan (archaeology); Engineering; Engineering management; Systems engineering; Architecture; Process management; Construction engineering; Lean construction; Computer science; Construction industry; Risk analysis (engineering); Operations management; Business","score_opus":0.01848736600849919,"score_gpt":0.1786818757294637,"score_spread":0.16019450972096452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2980846909","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19792119,0.09078495,0.13994233,0.39871085,0.0013312736,0.00037885216,0.00085479364,0.0007084988,0.16936725],"genre_scores_gemma":[0.8663892,0.048007015,0.07323678,0.0038697093,0.00071404164,0.00024884005,0.00049026037,0.00016218805,0.0068818317],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9838288,0.009964059,0.000604372,0.00071588263,0.0038768586,0.0010101395],"domain_scores_gemma":[0.9429557,0.043797802,0.002529215,0.0032868735,0.0051401397,0.0022903136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020788401,0.0008436462,0.00087264105,0.0035080947,0.0035030474,0.011693886,0.0042314646,0.0034715517,0.0056649884],"category_scores_gemma":[0.022459963,0.0008602926,0.00051047123,0.008480161,0.007849581,0.019208329,0.0062619094,0.0036754764,0.00092781533],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008657333,0.0004659068,0.02069926,0.0020797157,0.00004909863,0.0005028649,0.019935703,0.008953493,0.0007884941,0.22005664,0.026966657,0.69941545],"study_design_scores_gemma":[0.000025260533,0.00015714484,0.018051628,0.0044267355,0.000043733868,0.0013371127,0.19175284,0.039567765,0.0016323961,0.28212193,0.46065485,0.00022858138],"about_ca_topic_score_codex":0.026430722,"about_ca_topic_score_gemma":0.027942292,"teacher_disagreement_score":0.026430722,"about_ca_system_score_codex":0.0062379064,"about_ca_system_score_gemma":0.014851525,"threshold_uncertainty_score":0.10994089},"labels":[],"label_agreement":null},{"id":"W2983521989","doi":"10.1108/ecam-03-2019-0119","title":"The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms","year":2019,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Knowledge management; Organizational structure; Informal organization; Perspective (graphical); Social network analysis; Architecture; Organizational network analysis; Digital transformation; Business; Computer science; Organizational learning; Social media; Management; World Wide Web","score_opus":0.0017285913169389174,"score_gpt":0.17155000174461318,"score_spread":0.16982141042767426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2983521989","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98811626,0.000108304856,0.00052759435,0.0006931044,0.000007604578,0.00002922108,0.000029256327,0.000008941705,0.010479697],"genre_scores_gemma":[0.99945194,0.00003464966,0.00013832451,0.000030808464,0.000003152558,0.000007507427,0.00001846266,0.0000018118576,0.00031338356],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9915035,0.0037821864,0.0003444398,0.00066659483,0.0018938085,0.0018094904],"domain_scores_gemma":[0.9686322,0.014827486,0.007031082,0.0019369961,0.0030518759,0.0045202947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045234673,0.00021421532,0.00017915742,0.0025103958,0.002599752,0.0064536463,0.00078883325,0.0007239618,0.0036138063],"category_scores_gemma":[0.020801254,0.00016856272,0.00022124482,0.001993778,0.0044538076,0.0033406424,0.0057056556,0.0009971248,0.00029052235],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003454647,0.0008839659,0.69469136,0.00020654577,0.000095155454,0.0019725913,0.101106755,0.0041328464,0.0043357173,0.048149984,0.0017090592,0.14237052],"study_design_scores_gemma":[0.000023638797,0.0003106399,0.8054691,0.00011053399,0.000023854049,0.0003068872,0.17163128,0.0030281679,0.00097522046,0.007182124,0.010889652,0.00004885537],"about_ca_topic_score_codex":0.013468732,"about_ca_topic_score_gemma":0.024373116,"teacher_disagreement_score":0.013468732,"about_ca_system_score_codex":0.007874203,"about_ca_system_score_gemma":0.0038841204,"threshold_uncertainty_score":0.057131648},"labels":[],"label_agreement":null},{"id":"W2985572923","doi":"10.1080/15623599.2019.1686836","title":"BIM-integrated TOPSIS-Fuzzy framework to optimize selection of sustainable building components","year":2019,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":67,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Multiple-criteria decision analysis; TOPSIS; Sustainability; Computer science; Decision support system; Ideal solution; Process (computing); Fuzzy logic; Building information modeling; Analytic hierarchy process; Management science; Selection (genetic algorithm); Systems engineering; Operations research; Risk analysis (engineering); Engineering; Data mining; Machine learning; Artificial intelligence; Operations management","score_opus":0.004976882418034429,"score_gpt":0.22471981180531414,"score_spread":0.2197429293872797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985572923","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008348871,0.0003926019,0.98222315,0.00015946003,0.000029337703,0.00017063016,0.00014436572,0.00027449123,0.008257079],"genre_scores_gemma":[0.30017635,0.0007425984,0.695185,0.00006237941,0.000020750615,0.0005756064,0.00041007836,0.00004177333,0.0027854796],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983095,0.0006888859,0.00010386884,0.00011596295,0.00067791867,0.000103928585],"domain_scores_gemma":[0.99968994,0.000108868866,0.000041952117,0.000019187397,0.00012240619,0.000017689075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021363685,0.0012124452,0.0010152352,0.0026904498,0.0009056419,0.0021658465,0.0012170543,0.00065975107,0.0035197006],"category_scores_gemma":[0.001558729,0.0005175203,0.001564397,0.0025465956,0.00055140385,0.0009798585,0.0014188355,0.00077878777,0.00054610753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000092443945,0.00016004872,0.0017569358,0.00072650134,0.00021306773,0.00037411603,0.0003936545,0.74857694,0.006400628,0.06441409,0.002830694,0.17406091],"study_design_scores_gemma":[0.000023630868,0.00010692104,0.00062489405,0.00010170855,0.00006517764,0.00012370123,0.0002624831,0.962839,0.0025729148,0.02626509,0.0069824187,0.00003211644],"about_ca_topic_score_codex":0.006997345,"about_ca_topic_score_gemma":0.007694974,"teacher_disagreement_score":0.006997345,"about_ca_system_score_codex":0.0014991581,"about_ca_system_score_gemma":0.0028705853,"threshold_uncertainty_score":0.013913214},"labels":[],"label_agreement":null},{"id":"W2985845493","doi":"","title":"Adopting the Principles of Building Physics, Smart Materials and New Technologies in the Design of Energy Efficient Buildings","year":2017,"lang":"en","type":"article","venue":"Environmental Reviews","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Efficient energy use; Architectural engineering; Environmentally friendly; Building automation; Climate change; Embodied energy; Global warming; Quality (philosophy); Environmental economics; Emerging technologies; Environmental quality; Building design; Environmental resource management; Engineering; Risk analysis (engineering); Computer science; Business; Environmental science; Ecology; Economics","score_opus":0.03491782709854111,"score_gpt":0.22931271173163,"score_spread":0.1943948846330889,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2985845493","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011464994,0.6924152,0.14424022,0.013056743,0.0018598139,0.00012244163,0.00003255035,0.00019364849,0.13661441],"genre_scores_gemma":[0.18636273,0.6290278,0.14359133,0.0025794043,0.0016839772,0.00022175015,0.00004450166,0.00010852393,0.03638003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986125,0.00044985063,0.00007806389,0.00011093052,0.000676518,0.00007208734],"domain_scores_gemma":[0.99972755,0.00015381671,0.000033593118,0.000022021264,0.00004709614,0.000015929065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013350416,0.0006375447,0.00054617756,0.0013022833,0.0007403193,0.0024477516,0.00077953323,0.0019173631,0.001426167],"category_scores_gemma":[0.0007176282,0.0005446029,0.0004438954,0.0013936802,0.0038182593,0.0026114439,0.0016997892,0.0022067921,0.00079953717],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021110267,0.00008670741,0.00036791686,0.0020374125,0.00002929057,0.00019978729,0.00088764855,0.0063357484,0.004747877,0.7340176,0.0050122566,0.24625668],"study_design_scores_gemma":[0.0000117855325,0.00013878391,0.00074723753,0.0012645426,0.000028113502,0.0007109427,0.0005043012,0.0037357302,0.004715576,0.23230794,0.75577956,0.00005558426],"about_ca_topic_score_codex":0.00076899753,"about_ca_topic_score_gemma":0.0013083902,"teacher_disagreement_score":0.0024477516,"about_ca_system_score_codex":0.0009621786,"about_ca_system_score_gemma":0.0010560926,"threshold_uncertainty_score":0.007060468},"labels":[],"label_agreement":null},{"id":"W2989704363","doi":"10.36680/j.itcon.2019.025","title":"A lean approach to optimize BIM information flow using value stream mapping","year":2019,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Value stream mapping; Building information modeling; Identification (biology); Process (computing); Productivity; Lean construction; Architecture; Process management; Engineering; Systems engineering; Information flow; Lean manufacturing; Computer science; Construction engineering; Knowledge management; Manufacturing engineering; Construction industry; Operations management","score_opus":0.0057682021033280215,"score_gpt":0.18820795976969387,"score_spread":0.18243975766636586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2989704363","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008532057,0.00008168382,0.9885932,0.00015311336,0.000010968424,0.00013274167,0.000055454355,0.00025226607,0.0021885256],"genre_scores_gemma":[0.17183113,0.00016378514,0.8261304,0.000050792925,0.000010225741,0.0002749498,0.00020287393,0.00009785581,0.0012380212],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9962773,0.0015465048,0.00019796148,0.0003748625,0.001302392,0.00030093515],"domain_scores_gemma":[0.9961196,0.0020375997,0.00044338248,0.0004273842,0.00083808624,0.00013392957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058156596,0.0014775123,0.0011597129,0.0036503216,0.0011789943,0.0038804305,0.0019345105,0.0010511421,0.0025332817],"category_scores_gemma":[0.007805912,0.0010668276,0.0012344698,0.0040974105,0.0013135286,0.0028199942,0.003621601,0.0014162497,0.00046579013],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011080131,0.000278064,0.0029647576,0.00036891174,0.00015513417,0.0002443555,0.00092484645,0.7035094,0.00653933,0.059168965,0.0013295263,0.22440591],"study_design_scores_gemma":[0.000025831454,0.0001277858,0.00043175198,0.0000723825,0.000044316763,0.00007893517,0.00042224085,0.9491365,0.004427045,0.040719446,0.004487616,0.00002611203],"about_ca_topic_score_codex":0.0052712183,"about_ca_topic_score_gemma":0.00737735,"teacher_disagreement_score":0.0058156596,"about_ca_system_score_codex":0.0020741718,"about_ca_system_score_gemma":0.005985701,"threshold_uncertainty_score":0.030756474},"labels":[],"label_agreement":null},{"id":"W2990810198","doi":"10.1061/(asce)co.1943-7862.0001747","title":"Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory","year":2019,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":34,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular programming; Risk analysis (engineering); Modular design; Risk management; Schedule; Process (computing); Computer science; Risk assessment; Systems engineering; Engineering","score_opus":0.009643938416521142,"score_gpt":0.23844107743330767,"score_spread":0.22879713901678653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2990810198","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019522404,0.00003803037,0.9971655,0.00006740328,0.000004289603,0.000049596416,0.000017667004,0.000091300884,0.0006139896],"genre_scores_gemma":[0.268612,0.00030318755,0.72844666,0.00010458344,0.00005468585,0.00059131876,0.00019176696,0.00009174625,0.0016041268],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99569726,0.0016543233,0.0002464134,0.00064714457,0.0014716178,0.00028329002],"domain_scores_gemma":[0.9897452,0.006246025,0.001537658,0.00053572404,0.0016680459,0.00026732392],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0090187285,0.0014686546,0.0012818535,0.00319599,0.00090685947,0.0025389958,0.00352299,0.001758022,0.002277735],"category_scores_gemma":[0.017624093,0.0013686026,0.0017177395,0.0015098397,0.001744992,0.0029679718,0.0032484713,0.0023324003,0.00038910354],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003827429,0.00007813497,0.0019968501,0.00014592092,0.00008995613,0.00013233555,0.0003198541,0.8986252,0.0022041127,0.04489735,0.0005448116,0.05092722],"study_design_scores_gemma":[0.00000936259,0.000040484727,0.0003283436,0.000035056066,0.000027722957,0.00004329581,0.000047307254,0.97582597,0.0008548129,0.021899458,0.00085919286,0.000029024388],"about_ca_topic_score_codex":0.0066832844,"about_ca_topic_score_gemma":0.0064759213,"teacher_disagreement_score":0.0090187285,"about_ca_system_score_codex":0.002429648,"about_ca_system_score_gemma":0.0045188507,"threshold_uncertainty_score":0.047696173},"labels":[],"label_agreement":null},{"id":"W2991942790","doi":"10.5381/jot","title":"The Journal of Object Technology","year":2017,"lang":"en","type":"paratext","venue":"The Journal of Object Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto; University of Victoria; Université de Montréal","funders":"","keywords":"Computer science; Object (grammar); Artificial intelligence","score_opus":0.007350684574505722,"score_gpt":0.23718608365782987,"score_spread":0.22983539908332415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2991942790","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002741066,0.13311885,0.043105867,0.029357579,0.021212611,0.00022009722,0.0011617866,0.0010402871,0.76804173],"genre_scores_gemma":[0.050768536,0.1080184,0.036443967,0.005279271,0.01066197,0.00036442463,0.0038417038,0.0017544049,0.78286725],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99524397,0.0010276361,0.0005970694,0.0006492015,0.002254849,0.0002271976],"domain_scores_gemma":[0.99576855,0.0010353074,0.0002261165,0.0012917151,0.001288413,0.0003898862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035688605,0.0010363582,0.001113629,0.0033725922,0.0022147472,0.018030582,0.0015972013,0.0030652187,0.115100585],"category_scores_gemma":[0.0076459064,0.00056742685,0.00086005044,0.0051645846,0.003690154,0.00934551,0.004968165,0.0037392925,0.047079008],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027806782,0.0000611844,0.00070021703,0.00059283467,0.000032531007,0.00015624237,0.00059828744,0.0002695122,0.00064387964,0.5411424,0.19484279,0.2609323],"study_design_scores_gemma":[0.000002120122,0.0000057901552,0.00017097851,0.00017889011,0.0000052932764,0.00013856882,0.00012700132,0.00009657642,0.00008822296,0.03616992,0.9630127,0.00000406455],"about_ca_topic_score_codex":0.0018626614,"about_ca_topic_score_gemma":0.0018814775,"teacher_disagreement_score":0.115100585,"about_ca_system_score_codex":0.0027645468,"about_ca_system_score_gemma":0.005092029,"threshold_uncertainty_score":0.38504982},"labels":[],"label_agreement":null},{"id":"W2992543799","doi":"10.1016/j.resconrec.2019.104605","title":"A selective disassembly multi-objective optimization approach for adaptive reuse of building components","year":2019,"lang":"en","type":"article","venue":"Resources Conservation and Recycling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":95,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Energy Council of Canada; Consejo Nacional de Ciencia y Tecnología","keywords":"Deconstruction (building); Reuse; Adaptive reuse; Component (thermodynamics); Key (lock); Process (computing); Sustainability; Asset (computer security); Risk analysis (engineering); Resource (disambiguation); Resource efficiency; Computer science; Engineering; Business; Civil engineering","score_opus":0.020639012312985927,"score_gpt":0.22690611816140988,"score_spread":0.20626710584842395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2992543799","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03012911,0.0003381637,0.9642135,0.00008425439,0.00004258374,0.000065822394,0.000050483188,0.0002181455,0.0048579285],"genre_scores_gemma":[0.5784534,0.00036331787,0.41366208,0.00012715497,0.000042387437,0.00036309529,0.00020279331,0.00017000001,0.006615699],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972576,0.00007832581,0.000014294148,0.000044255306,0.00009446211,0.00004280908],"domain_scores_gemma":[0.9997104,0.00013552082,0.000033754073,0.000025082318,0.000077466524,0.000017755572],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000866111,0.001095703,0.0011823693,0.00090116076,0.0004639989,0.0008243313,0.0015087359,0.0010666471,0.002279018],"category_scores_gemma":[0.000887011,0.0007447728,0.0011273539,0.0008585479,0.00047342383,0.00060686294,0.0012149852,0.00070295547,0.00027188179],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023800625,0.00003725717,0.00019296174,0.00004199752,0.00003988459,0.000032390184,0.000019360366,0.9782204,0.0014511175,0.0019132507,0.00023117303,0.017796367],"study_design_scores_gemma":[0.0000034573663,0.000017791253,0.000055213823,0.0000024832136,0.000007328402,0.000005773854,0.0000048403235,0.9991805,0.00021169739,0.00031127298,0.00019774151,0.0000019031636],"about_ca_topic_score_codex":0.007299474,"about_ca_topic_score_gemma":0.0086524645,"teacher_disagreement_score":0.007299474,"about_ca_system_score_codex":0.00057423173,"about_ca_system_score_gemma":0.0012499599,"threshold_uncertainty_score":0.014513969},"labels":[],"label_agreement":null},{"id":"W2993309745","doi":"","title":"Architecture of a Distributed, Model-Based Asset Management System","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Asset management; Architecture; Business; Finance; Geography","score_opus":0.00545467557402318,"score_gpt":0.1830666826185672,"score_spread":0.17761200704454402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2993309745","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034056082,0.00035512727,0.91793114,0.00097560807,0.00010175182,0.00030130596,0.00063232216,0.031587075,0.014059601],"genre_scores_gemma":[0.46052125,0.0006247756,0.5162423,0.00047462588,0.000074064956,0.0005364408,0.0035472605,0.0010653413,0.016914055],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99938667,0.000109074,0.00008079597,0.00012987305,0.00023290432,0.000060661656],"domain_scores_gemma":[0.99939525,0.00010188255,0.00004636445,0.00018297978,0.0001408717,0.0001327393],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012247452,0.00042015285,0.00064175884,0.0010144864,0.0008345136,0.0031134333,0.0020943666,0.0011962781,0.0057444125],"category_scores_gemma":[0.0014890735,0.00053384114,0.00045838387,0.0008711378,0.00057374703,0.0020014294,0.0023588324,0.0010590582,0.0027484153],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007525909,0.0012115139,0.008675134,0.0005451394,0.00034787072,0.0011695222,0.0018429321,0.33131075,0.087354146,0.108882576,0.04029036,0.41761756],"study_design_scores_gemma":[0.0001600226,0.0001933301,0.0016090036,0.00008260716,0.00015417603,0.00028014486,0.00016439414,0.8899129,0.013629527,0.029529927,0.064203225,0.00008081401],"about_ca_topic_score_codex":0.0063897613,"about_ca_topic_score_gemma":0.0056397608,"teacher_disagreement_score":0.0063897613,"about_ca_system_score_codex":0.000992728,"about_ca_system_score_gemma":0.0022814027,"threshold_uncertainty_score":0.019217014},"labels":[],"label_agreement":null},{"id":"W2997759392","doi":"10.1007/978-3-030-33570-0_16","title":"The Impact of Digitalization on Processes and Organizational Structures of Architecture and Engineering Firms","year":2019,"lang":"en","type":"book-chapter","venue":"Research for development","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Process (computing); Architecture; Digital transformation; Work (physics); Engineering; Knowledge management; Process management; Business; Organizational structure; Engineering management; Computer science; Management; Mechanical engineering; Geography","score_opus":0.020305853392573164,"score_gpt":0.2692571799490969,"score_spread":0.24895132655652377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2997759392","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7662178,0.0018912056,0.001677457,0.0014983034,0.000018304434,0.00004135074,0.000085483625,0.000015614622,0.22855449],"genre_scores_gemma":[0.99330163,0.00062012556,0.00054297474,0.000058934507,0.000007842609,0.000013876701,0.000053366628,0.0000045386378,0.0053968024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99846613,0.0006945046,0.000036550642,0.00015391682,0.00032464278,0.00032440326],"domain_scores_gemma":[0.9969319,0.0017017603,0.0004461781,0.00024867323,0.00023686804,0.00043462828],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013628004,0.00012286071,0.00009607099,0.001607958,0.0015600667,0.005949949,0.000496223,0.0004587734,0.005722604],"category_scores_gemma":[0.003075928,0.00010764232,0.00014078117,0.0029691276,0.0035529702,0.0028043545,0.002851681,0.00057555694,0.0004158831],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029918915,0.000620047,0.111271136,0.00021409853,0.000030991672,0.0009793269,0.06073483,0.0056685507,0.0022584454,0.5683621,0.0031204706,0.2464408],"study_design_scores_gemma":[0.00007347381,0.0003531202,0.54806715,0.0004351841,0.000057891444,0.0007022946,0.14334458,0.0066961613,0.0030488896,0.10589148,0.19127584,0.00005400328],"about_ca_topic_score_codex":0.012937335,"about_ca_topic_score_gemma":0.016427523,"teacher_disagreement_score":0.012937335,"about_ca_system_score_codex":0.0077209407,"about_ca_system_score_gemma":0.0032476748,"threshold_uncertainty_score":0.056019664},"labels":[],"label_agreement":null},{"id":"W2998429966","doi":"10.1016/j.autcon.2019.103065","title":"BIM-based decision support system for automated manufacturability check of wood frame assemblies","year":2019,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":53,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Design for manufacturability; Manufacturing engineering; Frame (networking); Automation; Product (mathematics); Process (computing); Factory (object-oriented programming); Building information modeling; Engineering; Software; Systems engineering; Computer science; Mechanical engineering; Operations management","score_opus":0.007398810980768447,"score_gpt":0.23277141251110978,"score_spread":0.22537260153034133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998429966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15116495,0.00047046907,0.73728704,0.00032281253,0.00021146207,0.0004911601,0.0038386467,0.09514034,0.011073119],"genre_scores_gemma":[0.77071136,0.00024846426,0.21566182,0.00025516964,0.000062428735,0.00041946466,0.004634722,0.00066050515,0.007346134],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99926287,0.0001295035,0.00006854895,0.00013474342,0.0003292707,0.0000750881],"domain_scores_gemma":[0.9992052,0.00018261973,0.00007755707,0.00014458319,0.00030538192,0.00008467228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009861623,0.00092818897,0.0012130783,0.0018961366,0.00055063545,0.0011718927,0.0014318124,0.00087093486,0.009149884],"category_scores_gemma":[0.0017519472,0.00052674813,0.00046676595,0.0008613392,0.00022451652,0.00088285573,0.0010131182,0.00043299785,0.0031539116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030735945,0.0012678899,0.0077262903,0.0005249827,0.000196015,0.0013583526,0.00047987123,0.09240079,0.10801744,0.0051858677,0.051901724,0.72786725],"study_design_scores_gemma":[0.00018880493,0.00024804712,0.0050985166,0.000051203922,0.00009697486,0.0003423628,0.00011494938,0.9266389,0.05041113,0.0021776967,0.014546266,0.00008509651],"about_ca_topic_score_codex":0.0024507479,"about_ca_topic_score_gemma":0.0020531593,"teacher_disagreement_score":0.009149884,"about_ca_system_score_codex":0.00043150087,"about_ca_system_score_gemma":0.00096109987,"threshold_uncertainty_score":0.03060937},"labels":[],"label_agreement":null},{"id":"W2998899296","doi":"10.1139/cjce-2019-0439","title":"Construction and resource short-term planning using a BIM-based ontological decision support system","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Resource (disambiguation); Process (computing); Resource planning; Term (time); Decision support system; Process management; Knowledge management; Management science; Engineering; Data mining","score_opus":0.018531453945450273,"score_gpt":0.20262093744248025,"score_spread":0.18408948349702997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2998899296","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025393898,0.00012337869,0.96126115,0.00040663147,0.00004087623,0.00022970734,0.00065921585,0.003873908,0.008011257],"genre_scores_gemma":[0.31842947,0.0002675572,0.6762901,0.00010525895,0.000018472276,0.00035243933,0.0016425643,0.00012493969,0.0027691817],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99916744,0.0002162433,0.00012671435,0.00012738489,0.00028501055,0.000077194054],"domain_scores_gemma":[0.99944776,0.00016473391,0.00006123862,0.00012356674,0.00014787988,0.000054839056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019380482,0.0005790866,0.00065257424,0.0018529175,0.0011245474,0.00274972,0.0013733911,0.0008620683,0.0026180283],"category_scores_gemma":[0.0021436051,0.0004888801,0.0009184207,0.0016751145,0.0005114821,0.0028072617,0.0026005954,0.0008132325,0.0007870158],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003855087,0.00072834594,0.0050646123,0.0003713275,0.00019634562,0.0012100778,0.0017101602,0.4006338,0.017879903,0.10185538,0.010367267,0.45959723],"study_design_scores_gemma":[0.000038729308,0.000045035486,0.0010178796,0.000049670834,0.000084901076,0.00012349818,0.0003349694,0.9577593,0.004556787,0.017635578,0.01830061,0.000052940624],"about_ca_topic_score_codex":0.010142473,"about_ca_topic_score_gemma":0.012845244,"teacher_disagreement_score":0.010142473,"about_ca_system_score_codex":0.0012035737,"about_ca_system_score_gemma":0.002888044,"threshold_uncertainty_score":0.020166874},"labels":[],"label_agreement":null},{"id":"W2999206313","doi":"10.1109/iesm45758.2019.8948082","title":"Multi-domain BIM interoperability: queries as data-exchange vectors","year":2019,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Interoperability; Computer science; Domain (mathematical analysis); Data exchange; Field (mathematics); World Wide Web; Software engineering; Database","score_opus":0.03939527235954288,"score_gpt":0.26391631602603605,"score_spread":0.22452104366649317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999206313","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008124458,0.00035599386,0.9805306,0.001030773,0.00007762006,0.00018559134,0.0007300445,0.002860049,0.0061048428],"genre_scores_gemma":[0.4316808,0.001057682,0.553158,0.0006871695,0.00019082808,0.00056574965,0.00353503,0.0018216274,0.007303105],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9870384,0.0050336933,0.001691368,0.0017659563,0.0038463192,0.0006242829],"domain_scores_gemma":[0.99008393,0.00429425,0.00065308646,0.0035377732,0.0011165531,0.00031439628],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011118757,0.00093331333,0.0012021535,0.003306221,0.0010300124,0.0108616175,0.002618443,0.0018461355,0.0049764034],"category_scores_gemma":[0.023730133,0.0008409134,0.001219594,0.005880536,0.0027416982,0.017556772,0.006101522,0.0022728767,0.001794787],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036362134,0.00019218543,0.0020143376,0.00035238618,0.00008228143,0.00027569055,0.002349202,0.025905263,0.0048983525,0.8129353,0.01080619,0.13982512],"study_design_scores_gemma":[0.00007912702,0.000098858975,0.0010998262,0.00020275264,0.000073568044,0.00041065025,0.001623625,0.257289,0.019211955,0.62203664,0.09776151,0.00011252772],"about_ca_topic_score_codex":0.0028243046,"about_ca_topic_score_gemma":0.0012682804,"teacher_disagreement_score":0.011118757,"about_ca_system_score_codex":0.0018213444,"about_ca_system_score_gemma":0.001616499,"threshold_uncertainty_score":0.058802307},"labels":[],"label_agreement":null},{"id":"W2999234604","doi":"10.1016/j.autcon.2020.103083","title":"Automated rigging design for heavy industrial lifts","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; North Carolina Space Grant","keywords":"Modular design; Lift (data mining); Engineering; Offset (computer science); Lifting equipment; Reliability engineering; Computer science; Simulation; Mechanical engineering; Operating system","score_opus":0.04070489391244067,"score_gpt":0.2403540588214327,"score_spread":0.19964916490899204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W2999234604","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10556074,0.00020181613,0.8786302,0.0000625323,0.000042775784,0.00014774974,0.00010375288,0.0026184896,0.012631848],"genre_scores_gemma":[0.7854578,0.00011604305,0.20855112,0.000019634437,0.000009610782,0.000061665094,0.00019344206,0.00024435416,0.0053463457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990115,0.00019749042,0.000033575274,0.00009573484,0.000548083,0.000113605354],"domain_scores_gemma":[0.9995059,0.00011032975,0.000052340863,0.00017929338,0.00012659346,0.000025652052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007667102,0.000953608,0.0008052349,0.00067273807,0.00065859297,0.0011422227,0.0009587813,0.0007700091,0.0059597353],"category_scores_gemma":[0.0008592264,0.00060398417,0.00065809226,0.000406608,0.00057817134,0.0006417258,0.0012282529,0.0007765094,0.0012063656],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005214662,0.00017540746,0.0019459408,0.0003242469,0.00004128449,0.00023371552,0.00037461318,0.5430322,0.11467227,0.012502378,0.0021145802,0.32406187],"study_design_scores_gemma":[0.000049711947,0.0004447568,0.0017794758,0.00005050992,0.00002675561,0.00015901284,0.000115384406,0.9433546,0.035222072,0.0055299145,0.0132292025,0.000038568443],"about_ca_topic_score_codex":0.0021407786,"about_ca_topic_score_gemma":0.0036002917,"teacher_disagreement_score":0.0059597353,"about_ca_system_score_codex":0.0004532801,"about_ca_system_score_gemma":0.0012129233,"threshold_uncertainty_score":0.019937336},"labels":[],"label_agreement":null},{"id":"W3000512602","doi":"10.1061/9780784482438.032","title":"The Design of Future Robotic Construction Lab","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Sandbox (software development); Computer science; Construct (python library); Virtual machine; Economic shortage; Automation; Construction engineering; Engineering management; Systems engineering; Software engineering; Engineering; Operating system","score_opus":0.0053662408753958795,"score_gpt":0.17340664180034215,"score_spread":0.16804040092494626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3000512602","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02616353,0.00022647453,0.94389474,0.000696641,0.00024312722,0.0005831713,0.00014293967,0.0039814706,0.024067959],"genre_scores_gemma":[0.30951345,0.00029401228,0.6658606,0.00039205057,0.000090938935,0.0015508881,0.0003264145,0.00018115954,0.021790436],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986848,0.0002792937,0.00007598172,0.00027997108,0.00047896375,0.00020094661],"domain_scores_gemma":[0.99900144,0.00008760453,0.00009366133,0.00017388546,0.00039139643,0.0002520583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001590801,0.0008735042,0.0006851478,0.00087164267,0.0014600446,0.0018434391,0.003028837,0.0014321369,0.010181049],"category_scores_gemma":[0.0011523718,0.00060578604,0.0006661726,0.00039764252,0.0010076108,0.0023811858,0.002307415,0.000696514,0.0043423017],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009344738,0.00088036625,0.008214031,0.0013658695,0.00011335308,0.001781361,0.00096836226,0.15951641,0.23181131,0.110736735,0.02297986,0.46069783],"study_design_scores_gemma":[0.00033269505,0.0036186245,0.0061452934,0.0002532628,0.0001867328,0.0030767636,0.00106072,0.5063432,0.10320926,0.022468919,0.3529251,0.00037951348],"about_ca_topic_score_codex":0.0012400362,"about_ca_topic_score_gemma":0.00120835,"teacher_disagreement_score":0.010181049,"about_ca_system_score_codex":0.0010056285,"about_ca_system_score_gemma":0.002398858,"threshold_uncertainty_score":0.034058988},"labels":[],"label_agreement":null},{"id":"W3003348403","doi":"10.1002/eng2.12107","title":"Predicting construction labor productivity using lower upper decomposition radial base function neural network","year":2020,"lang":"en","type":"article","venue":"Engineering Reports","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa; Concordia University","funders":"","keywords":"Artificial neural network; Radial basis function; Productivity; Computer science; Function (biology); Productivity model; Artificial intelligence; Engineering; Industrial engineering; Operations research; Economics; Total factor productivity","score_opus":0.006348048161758056,"score_gpt":0.1871221640785342,"score_spread":0.18077411591677614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003348403","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68766016,0.00023507667,0.30805364,0.00015528953,0.00004346209,0.00007386913,0.00040079004,0.0006060259,0.002771656],"genre_scores_gemma":[0.98382634,0.00006890526,0.015250781,0.000008418566,0.0000044941903,0.000034573313,0.00013901018,0.0000067527058,0.0006607191],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978226,0.000062345454,0.000011731379,0.000053534997,0.000055095494,0.00003515367],"domain_scores_gemma":[0.999584,0.00019208112,0.000047918587,0.000022432554,0.00013873505,0.0000148578265],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068052777,0.00057740894,0.0003704602,0.00081657583,0.00019205034,0.00066131854,0.0005275976,0.000482375,0.0009252676],"category_scores_gemma":[0.001608847,0.00020334049,0.0003736467,0.0007503329,0.00015067139,0.00039239437,0.0002717561,0.00036617584,0.00021054954],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006388559,0.00008389158,0.011544927,0.000027656222,0.000029051631,0.000036715952,0.000026713,0.949099,0.0012354281,0.00027577856,0.00030189348,0.037275124],"study_design_scores_gemma":[7.8523874e-7,0.000006197398,0.0010776456,0.0000015074218,0.0000015894753,0.0000012833306,0.0000041873786,0.99865973,0.00016773229,0.000055272005,0.000022450124,0.000001623582],"about_ca_topic_score_codex":0.045781538,"about_ca_topic_score_gemma":0.022644376,"teacher_disagreement_score":0.045781538,"about_ca_system_score_codex":0.00090444164,"about_ca_system_score_gemma":0.0007425468,"threshold_uncertainty_score":0.09103012},"labels":[],"label_agreement":null},{"id":"W3003823130","doi":"10.1007/s11356-020-07826-0","title":"Correction to: From legacy pollutants to emerging contaminants: recent inputs from the 2018 conference of EcoBIM network","year":2020,"lang":"en","type":"erratum","venue":"Environmental Science and Pollution Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski","funders":"","keywords":"Mistake; Ecotoxicology; Pollutant; Environmental science; Computer science; Environmental chemistry; Political science; Ecology; Law; Biology; Chemistry","score_opus":0.03156030181129232,"score_gpt":0.2754345219682191,"score_spread":0.24387422015692678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3003823130","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009843685,0.00074903877,0.00058879814,0.06919827,0.90938914,0.000046416444,0.0088530965,0.00061497197,0.010461839],"genre_scores_gemma":[0.007887785,0.008183087,0.008261462,0.13093412,0.20110874,0.00066394894,0.022973765,0.004113899,0.6158732],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9926213,0.0006118415,0.00094308663,0.0007104495,0.0045292345,0.00058414123],"domain_scores_gemma":[0.94549656,0.0056792875,0.0019744455,0.002256459,0.042640038,0.0019531455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004506131,0.0028784617,0.0017992363,0.0050881244,0.003491,0.007470116,0.003449928,0.0077772303,0.11954663],"category_scores_gemma":[0.06076291,0.0011693125,0.0014425884,0.004937615,0.0024842292,0.0041837376,0.0038300594,0.013076753,0.089559235],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008035587,0.000001921944,0.00001946617,0.000038047107,0.000001285814,0.000016019158,0.0000065962226,0.000017594339,0.000008880057,0.00022055171,0.9978508,0.0018108805],"study_design_scores_gemma":[0.000016145426,0.0000049034575,0.00044953148,0.00022321171,0.000006106748,0.000036761172,0.000079795915,0.00008362094,0.000111452326,0.00068718096,0.9982857,0.000015521337],"about_ca_topic_score_codex":0.08621768,"about_ca_topic_score_gemma":0.0885439,"teacher_disagreement_score":0.11954663,"about_ca_system_score_codex":0.005491037,"about_ca_system_score_gemma":0.014722761,"threshold_uncertainty_score":0.39992326},"labels":[],"label_agreement":null},{"id":"W3005260446","doi":"10.1016/j.autcon.2020.103076","title":"Chronographical spatiotemporal dynamic 4D planning","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Gantt chart; Building information modeling; Process (computing); Computer science; Schedule; Set (abstract data type); Dimension (graph theory); Project management; Industrial engineering; Simulation modeling; Systems engineering; Software engineering; Simulation; Scheduling (production processes); Engineering","score_opus":0.009941865573041726,"score_gpt":0.22209299910106778,"score_spread":0.21215113352802606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3005260446","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014851938,0.0014279584,0.8609032,0.00046904234,0.000794183,0.00037670464,0.009254062,0.003802841,0.10812003],"genre_scores_gemma":[0.21501735,0.0033073495,0.7335008,0.00017078489,0.00009529155,0.00045833475,0.013097375,0.001112523,0.03324024],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993536,0.00010235559,0.00005968971,0.00015980133,0.00025513544,0.0000693486],"domain_scores_gemma":[0.9992648,0.00013703418,0.00005555537,0.00021900004,0.0002812204,0.000042456064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005068229,0.000773953,0.00047160508,0.0028655843,0.0013427825,0.0025376398,0.0010312059,0.00058747997,0.035534132],"category_scores_gemma":[0.0021561165,0.00068104616,0.0006450855,0.005058453,0.001042671,0.0020910765,0.0022383044,0.0008265801,0.005715782],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047871188,0.00007643839,0.0041389433,0.0008029407,0.00006514955,0.0007587958,0.0013896909,0.103576615,0.010336709,0.48810694,0.048561193,0.34170786],"study_design_scores_gemma":[0.00004441476,0.00011145335,0.0030950515,0.00037337167,0.000068252724,0.0007225878,0.0012087026,0.12765731,0.012406725,0.17798582,0.67620206,0.00012414847],"about_ca_topic_score_codex":0.021172727,"about_ca_topic_score_gemma":0.04331993,"teacher_disagreement_score":0.035534132,"about_ca_system_score_codex":0.0009357963,"about_ca_system_score_gemma":0.0022873844,"threshold_uncertainty_score":0.11887354},"labels":[],"label_agreement":null},{"id":"W3006990853","doi":"10.1007/s42524-019-0086-4","title":"Investigating the challenges related to combining BIM and Last Planner System on construction sites","year":2020,"lang":"en","type":"article","venue":"Frontiers of Engineering Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Planner; Lean construction; Work (physics); Plan (archaeology); Process management; Action plan; Productivity; Building information modeling; Action research; Computer science; Control (management); Action (physics); Engineering management; Service (business); Resistance (ecology); Production (economics); Knowledge management; Construction industry; Business; Risk analysis (engineering); Operations management; Construction engineering; Engineering; Marketing; Management","score_opus":0.009420885512817783,"score_gpt":0.16841130426798936,"score_spread":0.1589904187551716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3006990853","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.558159,0.0016098717,0.36206296,0.008983661,0.0004214999,0.0007340723,0.0011659659,0.0014837489,0.06537917],"genre_scores_gemma":[0.84732085,0.00042346204,0.14818208,0.00021499771,0.000044523098,0.00012753849,0.00053892046,0.00015094121,0.0029965804],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.98902905,0.0065152673,0.0003400296,0.0007469723,0.0024592252,0.00090956164],"domain_scores_gemma":[0.9865904,0.006975692,0.0007702849,0.0017548524,0.003236335,0.00067258725],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013890115,0.00087606185,0.0011243402,0.0018952362,0.0016890864,0.008046676,0.00301007,0.0028335846,0.007138232],"category_scores_gemma":[0.023565322,0.0010717497,0.0007598121,0.0031436638,0.0014869998,0.010989586,0.0050519,0.001922675,0.0015429447],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000986434,0.0012460714,0.0649051,0.0009902742,0.0004384653,0.00079723896,0.0028770126,0.43497297,0.015922435,0.07198106,0.011218885,0.393664],"study_design_scores_gemma":[0.00004910951,0.00042783187,0.016052404,0.00020938896,0.00018507436,0.00034558985,0.009619298,0.92104065,0.008316719,0.022326082,0.02132604,0.00010182143],"about_ca_topic_score_codex":0.02116831,"about_ca_topic_score_gemma":0.030557059,"teacher_disagreement_score":0.02116831,"about_ca_system_score_codex":0.0022703898,"about_ca_system_score_gemma":0.0046794475,"threshold_uncertainty_score":0.07345885},"labels":[],"label_agreement":null},{"id":"W3007839499","doi":"10.1109/wsc40007.2019.9004896","title":"On-site Assembly of Modular Building Using Discrete Event Simulation","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Prefabrication; Discrete event simulation; Computer science; Modular construction; Factory (object-oriented programming); Process (computing); Event (particle physics); Quality (philosophy); Simulation modeling; Systems engineering; Industrial engineering; Engineering; Simulation; Civil engineering","score_opus":0.008816264278268217,"score_gpt":0.2456691707494386,"score_spread":0.23685290647117038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3007839499","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19165838,0.0001401598,0.7823629,0.00010242112,0.000075414086,0.00024068885,0.00065202493,0.0016781003,0.023089908],"genre_scores_gemma":[0.9232822,0.0001526219,0.07139598,0.000022657372,0.000010031766,0.0002451273,0.00050103414,0.0000975917,0.004292792],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963176,0.000116618045,0.000020655021,0.000060028106,0.000108888074,0.0000620005],"domain_scores_gemma":[0.9993771,0.0003556554,0.00006358511,0.000080389385,0.00007647099,0.000046778336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006654746,0.0007116008,0.00090385147,0.0006328609,0.00043442522,0.001069836,0.0011817039,0.0008819544,0.0045775217],"category_scores_gemma":[0.0010321185,0.00044975642,0.0010801413,0.0005779711,0.0004979287,0.00063861266,0.0008830951,0.00052292366,0.00040609125],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019784178,0.000020685806,0.00029621573,0.000015093801,0.000007350542,0.000027704384,0.000014262912,0.99628145,0.00036823231,0.0010892907,0.00005590598,0.0018040857],"study_design_scores_gemma":[0.0000040033997,0.000007293199,0.00004622143,0.0000015213767,0.000002210742,0.0000032092382,0.000003956291,0.99917275,0.00029152533,0.00026408926,0.00020130111,0.0000019137233],"about_ca_topic_score_codex":0.009426845,"about_ca_topic_score_gemma":0.0067052925,"teacher_disagreement_score":0.009426845,"about_ca_system_score_codex":0.0006535324,"about_ca_system_score_gemma":0.000834889,"threshold_uncertainty_score":0.018743932},"labels":[],"label_agreement":null},{"id":"W3009200285","doi":"10.1108/ecam-04-2019-0222","title":"Revolutionising cost structure for integrated project delivery: a BIM-based solution","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Activity-based costing; Integrated project delivery; Building information modeling; Computer science; Estimation; Risk analysis (engineering); Work breakdown structure; Profit (economics); Project management; Reliability engineering; Systems engineering; Operations research; Operations management; Project planning; Engineering; Business; Scheduling (production processes)","score_opus":0.011215618689256033,"score_gpt":0.1998241615331839,"score_spread":0.1886085428439279,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009200285","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004365174,0.0007063133,0.983993,0.0009598786,0.000054229207,0.00018449777,0.00011619982,0.00027305802,0.0093477],"genre_scores_gemma":[0.1301446,0.0018660353,0.8633281,0.00013106356,0.000051478364,0.00046728918,0.00038516542,0.00013179767,0.0034945433],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9909923,0.0032199495,0.00049852196,0.0006188824,0.004313805,0.00035649238],"domain_scores_gemma":[0.99444205,0.0017378854,0.00074324326,0.0008069445,0.0020769509,0.0001928605],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0069076545,0.001461712,0.0009997978,0.0064945985,0.0010152545,0.005733445,0.003338365,0.0017891123,0.004798199],"category_scores_gemma":[0.013164484,0.0009930993,0.0013451031,0.0063256333,0.0013003615,0.0061292523,0.005056543,0.0020781404,0.0011877386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048349186,0.00018887692,0.0021273512,0.00083702157,0.00008605606,0.00016834015,0.000530835,0.22271575,0.0020885486,0.31564623,0.00420166,0.45136088],"study_design_scores_gemma":[0.000045259956,0.00020459208,0.0027353058,0.0010750408,0.00013230374,0.0004781054,0.0014836851,0.66758996,0.0044656536,0.23266603,0.08899636,0.00012766919],"about_ca_topic_score_codex":0.004236191,"about_ca_topic_score_gemma":0.003526909,"teacher_disagreement_score":0.0069076545,"about_ca_system_score_codex":0.0038994465,"about_ca_system_score_gemma":0.0058586136,"threshold_uncertainty_score":0.036531627},"labels":[],"label_agreement":null},{"id":"W3009442424","doi":"10.1061/(asce)co.1943-7862.0001826","title":"Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":40,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","funders":"","keywords":"Monte Carlo method; Crew; Fuzzy logic; Computer science; Scope (computer science); Industrial engineering; Artificial intelligence; Engineering; Mathematics; Statistics","score_opus":0.00796218826544233,"score_gpt":0.18291965233514895,"score_spread":0.17495746406970664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3009442424","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29503077,0.00020936201,0.6782474,0.0004941929,0.000061467676,0.00012292743,0.00031282258,0.00027243412,0.025248649],"genre_scores_gemma":[0.96800363,0.000098273355,0.028479533,0.00003043861,0.00000725352,0.000108139764,0.00009504255,0.000016655158,0.0031610325],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996126,0.00016492348,0.00001846091,0.0000518377,0.000101961,0.000050105493],"domain_scores_gemma":[0.9992105,0.0004898326,0.00008478917,0.00004837407,0.00011845519,0.000048057344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00081964344,0.00043616307,0.0005908456,0.0005524784,0.00053471274,0.0011150541,0.00087023556,0.0014113568,0.0020111764],"category_scores_gemma":[0.0021794569,0.0003111962,0.0005388865,0.00070769223,0.0007155819,0.0007249999,0.00068207434,0.0007030777,0.0001743253],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000073118663,0.0000065274794,0.00018073943,0.0000030532967,0.0000039274073,0.000011220262,0.000012842839,0.99574596,0.00010728829,0.0032402815,0.000034327157,0.0006464289],"study_design_scores_gemma":[0.000002651346,0.0000036802921,0.000059105165,0.000001061735,0.0000014020517,0.0000019794172,0.0000042063098,0.9989568,0.000052421332,0.0008289144,0.00008552599,0.000002228983],"about_ca_topic_score_codex":0.027802035,"about_ca_topic_score_gemma":0.013317953,"teacher_disagreement_score":0.027802035,"about_ca_system_score_codex":0.0012354685,"about_ca_system_score_gemma":0.0012703986,"threshold_uncertainty_score":0.055280447},"labels":[],"label_agreement":null},{"id":"W3010695679","doi":"10.5267/j.ijdns.2019.12.001","title":"Ranking of building maintenance contractors using multi-criteria decision making methods and an artificial neural network model","year":2020,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Ranking (information retrieval); Computer science; Artificial intelligence; Decision model; Machine learning","score_opus":0.09401472220213036,"score_gpt":0.40928366360032864,"score_spread":0.3152689413981983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3010695679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36803856,0.00071766035,0.62324345,0.00067184167,0.00010693235,0.00093361054,0.00027843556,0.00016884733,0.005840695],"genre_scores_gemma":[0.8527692,0.00022286017,0.14477886,0.000078337136,0.000036954436,0.00048587323,0.00020415607,0.00001356697,0.0014100835],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99570185,0.0025914023,0.0002950653,0.00037153164,0.0007381971,0.0003019929],"domain_scores_gemma":[0.99422544,0.004129519,0.00046767332,0.00009291145,0.0008394774,0.00024502355],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007029327,0.0013175977,0.0014573587,0.002995294,0.0007383241,0.0021911478,0.0013012233,0.0012386629,0.002581049],"category_scores_gemma":[0.00770114,0.00043051172,0.0012690894,0.0019982897,0.00057005184,0.0010576784,0.00096186507,0.0009242209,0.00019355907],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007049792,0.0005804406,0.008806754,0.0003911053,0.00038287224,0.00018711986,0.00023928886,0.8818904,0.0012049495,0.0036133386,0.00094924314,0.101049505],"study_design_scores_gemma":[0.000024789992,0.00017136965,0.0010260175,0.000022838174,0.000028262448,0.000010575125,0.00009940244,0.9970048,0.00033009064,0.0011153381,0.00014934773,0.000017221892],"about_ca_topic_score_codex":0.008073982,"about_ca_topic_score_gemma":0.0071787476,"teacher_disagreement_score":0.008073982,"about_ca_system_score_codex":0.002212505,"about_ca_system_score_gemma":0.0024309834,"threshold_uncertainty_score":0.03717506},"labels":[],"label_agreement":null},{"id":"W3010730395","doi":"10.19255/jmpm02215","title":"Industry 4.0 in Construction Site Logistics: A Comparative Analysis of Research and Practice","year":2020,"lang":"en","type":"article","venue":"Journal of Modern Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Industry 4.0; Business; Construction industry; Supply chain; Supply chain management; Digital transformation; Emerging technologies; Industrial organization; Engineering management; Engineering; Computer science; Marketing; Construction engineering","score_opus":0.12696708095813614,"score_gpt":0.3761409864316774,"score_spread":0.2491739054735413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3010730395","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.82226473,0.071060024,0.0043714563,0.013789258,0.00012636132,0.00031267095,0.00018704904,0.000023582057,0.08786493],"genre_scores_gemma":[0.9643316,0.030558277,0.0028373487,0.0005965199,0.00005020594,0.00013391327,0.00008526784,0.000013901378,0.001392926],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9729065,0.017546667,0.0015315148,0.0010518737,0.005528454,0.0014349356],"domain_scores_gemma":[0.9255263,0.05748199,0.006746208,0.0015297289,0.006834823,0.0018808927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02825133,0.00024205136,0.00048824487,0.018982716,0.002463595,0.007100193,0.0011141017,0.0017471479,0.0034386085],"category_scores_gemma":[0.03693572,0.00033996053,0.0003799336,0.035643656,0.0067239674,0.0065751756,0.004975056,0.0009658005,0.00034057884],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002813358,0.0005744742,0.08380168,0.007375466,0.00014091475,0.0015693805,0.30755648,0.001311823,0.0008214395,0.25461242,0.0054324316,0.33652213],"study_design_scores_gemma":[0.00003462438,0.00045123513,0.12791681,0.011972939,0.00010602408,0.0008605968,0.7203965,0.0010398088,0.0006035499,0.010873777,0.12567526,0.00006883451],"about_ca_topic_score_codex":0.00664351,"about_ca_topic_score_gemma":0.012686535,"teacher_disagreement_score":0.02825133,"about_ca_system_score_codex":0.012268865,"about_ca_system_score_gemma":0.019648243,"threshold_uncertainty_score":0.14940912},"labels":[],"label_agreement":null},{"id":"W3011216540","doi":"10.1061/(asce)la.1943-4170.0000391","title":"Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects","year":2020,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Viewpoints; Argument (complex analysis); Computer science; Scope (computer science); Stakeholder; Dispute resolution; Event (particle physics); Risk analysis (engineering); Operations research; Law; Engineering; Business; Political science","score_opus":0.013300325486150347,"score_gpt":0.21569715941777448,"score_spread":0.20239683393162414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011216540","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029833626,0.98898214,0.0023004324,0.0007199462,0.00017843385,0.00007674856,0.00015370213,0.000031860836,0.0045733377],"genre_scores_gemma":[0.0152575895,0.98097265,0.0028416163,0.00027132442,0.00011230313,0.000063221254,0.00015647411,0.00001625058,0.00030852793],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9939032,0.0026323935,0.0013224467,0.00043513783,0.0015571698,0.00014947953],"domain_scores_gemma":[0.9575374,0.035259992,0.0021166764,0.0007165398,0.004068825,0.00030069202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075938865,0.00072171545,0.0011673766,0.012556899,0.0007883204,0.0026424984,0.0020815132,0.0019959498,0.00426552],"category_scores_gemma":[0.02757688,0.0007379287,0.0013690275,0.012500478,0.0013188174,0.0026446623,0.0013423279,0.00083616324,0.000993063],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013547996,0.00007811266,0.004760972,0.06950381,0.00021314518,0.0005929498,0.0020955359,0.001116508,0.0007166654,0.0036446382,0.012599288,0.9045429],"study_design_scores_gemma":[0.000028427941,0.00029530472,0.019929098,0.17063755,0.0013316249,0.005338804,0.0049950485,0.0015862178,0.0022916375,0.0036205947,0.7897744,0.00017123653],"about_ca_topic_score_codex":0.0064619128,"about_ca_topic_score_gemma":0.009146724,"teacher_disagreement_score":0.012556899,"about_ca_system_score_codex":0.0015357893,"about_ca_system_score_gemma":0.0045699473,"threshold_uncertainty_score":0.040160775},"labels":[],"label_agreement":null},{"id":"W3011942206","doi":"10.18280/ijsse.100110","title":"Using BIM for the Assessment of the Seismic Performance of Educational Buildings","year":2020,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Comisión Nacional de Investigación Científica y Tecnológica; Pontificia Universidad Católica de Valparaíso; Corporación de Fomento de la Producción","keywords":"Construction engineering; Computer science; Engineering; Forensic engineering","score_opus":0.010560548922388325,"score_gpt":0.24420222333665892,"score_spread":0.23364167441427058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3011942206","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5310438,0.0009582166,0.4396431,0.00026239868,0.00007055208,0.00037344196,0.0015973141,0.0009427915,0.025108306],"genre_scores_gemma":[0.87099177,0.0005418184,0.12626098,0.000020473573,0.000014637665,0.000122045545,0.00073442626,0.00004622146,0.0012676402],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99813676,0.0008234085,0.00007633749,0.00010793396,0.0007364625,0.000119029166],"domain_scores_gemma":[0.9990452,0.0003955773,0.00007550845,0.0001777939,0.00024410526,0.00006178709],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002104338,0.00093001255,0.0006268546,0.0055154483,0.0005622979,0.001990185,0.0005544791,0.00076805684,0.0018853265],"category_scores_gemma":[0.003491468,0.00039319327,0.00055587135,0.0038988725,0.00054352975,0.0016390365,0.0016936461,0.00045425314,0.00075707206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004057707,0.00041539306,0.03337565,0.00039631905,0.00014428083,0.0004647366,0.0012966546,0.5017596,0.024477648,0.016086947,0.0011601757,0.42001686],"study_design_scores_gemma":[0.000021940297,0.00037323093,0.03570814,0.00012380668,0.00008358362,0.0005327909,0.0012757073,0.9248336,0.018537736,0.008954596,0.009463284,0.00009145645],"about_ca_topic_score_codex":0.0023505767,"about_ca_topic_score_gemma":0.003093426,"teacher_disagreement_score":0.0055154483,"about_ca_system_score_codex":0.000772522,"about_ca_system_score_gemma":0.0010209248,"threshold_uncertainty_score":0.011128962},"labels":[],"label_agreement":null},{"id":"W3013060269","doi":"10.1016/j.autcon.2020.103175","title":"Evaluating industrial modularization strategies: Local vs. overseas fabrication","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Modular programming; Modular design; Quality (philosophy); Automation; Fabrication; Engineering; Manufacturing engineering; Systems engineering; Outsourcing; Computer science; Mechanical engineering; Business","score_opus":0.04111430657511869,"score_gpt":0.26990582990104506,"score_spread":0.22879152332592637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3013060269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9928185,0.00013139678,0.002689431,0.000022240385,0.0000059177205,0.00009717166,0.0000650088,0.000025276348,0.004145034],"genre_scores_gemma":[0.9950311,0.000119992284,0.004061591,0.000012655732,0.000003829721,0.000050434126,0.00010411488,0.000011997139,0.0006041836],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99720097,0.0013912934,0.00012877666,0.0003036302,0.0007167415,0.00025865395],"domain_scores_gemma":[0.9921279,0.0044480325,0.001056778,0.00054913375,0.0013910822,0.0004270903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062784827,0.0009343414,0.0005527491,0.0013600626,0.00040115928,0.0017888244,0.000640548,0.0008832668,0.002801609],"category_scores_gemma":[0.011168822,0.00021214936,0.0005532467,0.001336637,0.0006204028,0.001954222,0.0009195085,0.0004729056,0.0004754907],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.017239815,0.0065250644,0.23492531,0.0010366783,0.0010535732,0.00026118333,0.0019687542,0.23140392,0.04033876,0.009296301,0.0012671197,0.45468357],"study_design_scores_gemma":[0.0016612975,0.06312696,0.4598874,0.00040371035,0.0026346606,0.00031332608,0.009190881,0.3643312,0.082933605,0.006605675,0.008731681,0.00017957369],"about_ca_topic_score_codex":0.0044229887,"about_ca_topic_score_gemma":0.011663989,"teacher_disagreement_score":0.0062784827,"about_ca_system_score_codex":0.0019423751,"about_ca_system_score_gemma":0.0014693743,"threshold_uncertainty_score":0.033204198},"labels":[],"label_agreement":null},{"id":"W30149090","doi":"10.1016/j.plipres.2018.08.002","title":"Tulsa office buildings | Paradigm Realty Advisors","year":2014,"lang":"en","type":"article","venue":"Progress in Lipid Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Institute of Diabetes and Digestive and Kidney Diseases; Canadian Institutes of Health Research; National Institutes of Health; Natural Sciences and Engineering Research Council of Canada; Naito Foundation","keywords":"Architectural engineering; Business; Public relations; Engineering; Political science","score_opus":0.027709718706184782,"score_gpt":0.32079063347113784,"score_spread":0.29308091476495307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W30149090","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011608084,0.00061622914,0.0011292784,0.007122763,0.0032054451,0.00017646229,0.0031309118,0.0016091634,0.98184896],"genre_scores_gemma":[0.0016619018,0.0002680275,0.0005965944,0.00066718936,0.00013763558,0.000045114448,0.0005804808,0.0002860041,0.99575716],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991254,0.00010692503,0.000034638768,0.00022681322,0.00035005045,0.0001561927],"domain_scores_gemma":[0.998047,0.00019468988,0.00006836885,0.0001605324,0.0006243631,0.0009049203],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0011378049,0.0012422772,0.00056667987,0.0011872923,0.003662506,0.004421001,0.001332121,0.0020744246,0.8877183],"category_scores_gemma":[0.0020858808,0.00052292016,0.00044161777,0.0008365067,0.0004973943,0.0015595537,0.0031230992,0.0024012201,0.6468512],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011972862,0.00016973478,0.00035101292,0.0000825364,0.000003596779,0.00015729626,0.00008725033,0.00006240569,0.00062398874,0.0034730337,0.90748507,0.0873842],"study_design_scores_gemma":[0.000007879118,0.000017307506,0.0002827489,0.00002840948,0.000001050528,0.000034660945,0.00011213163,0.000058067366,0.00010694421,0.0002485783,0.9990988,0.0000034580034],"about_ca_topic_score_codex":0.00823301,"about_ca_topic_score_gemma":0.024536032,"teacher_disagreement_score":0.11228168,"about_ca_system_score_codex":0.0018681384,"about_ca_system_score_gemma":0.0038914795,"threshold_uncertainty_score":0.16015613},"labels":[],"label_agreement":null},{"id":"W3016837706","doi":"10.1061/(asce)co.1943-7862.0001854","title":"Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":104,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Fuzzy logic; Construction management; Computer science; Face (sociological concept); Management science; Engineering management; Construction industry; Systems engineering; Construction engineering; Engineering; Artificial intelligence","score_opus":0.0070153483480315075,"score_gpt":0.18949988606198395,"score_spread":0.18248453771395245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3016837706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004004223,0.024400935,0.91000175,0.005288415,0.000876715,0.00009408887,0.000115419476,0.0002540264,0.054964438],"genre_scores_gemma":[0.2620988,0.030794943,0.6781926,0.001483335,0.0014008841,0.0003827774,0.00021869826,0.00007387387,0.02535406],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9982553,0.0006815599,0.00010748513,0.00016214332,0.0007225373,0.00007098333],"domain_scores_gemma":[0.9987208,0.00075258774,0.0001308862,0.00011250977,0.00024391271,0.000039302722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002910055,0.000798969,0.0007450737,0.0029286053,0.0011449532,0.0029629203,0.0011415754,0.0016867924,0.0049142023],"category_scores_gemma":[0.0030744781,0.00033585227,0.0012440657,0.0027530014,0.002826786,0.0028230182,0.0014407666,0.0019711815,0.00079996657],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022974293,0.00003757233,0.00045165743,0.00035516036,0.00007166159,0.00015232067,0.00048795587,0.03145836,0.0010384307,0.82486564,0.0075600413,0.13349822],"study_design_scores_gemma":[0.000018127368,0.000068735295,0.00063162064,0.00045956377,0.00003915015,0.00028649403,0.0004795784,0.09426321,0.00088689616,0.79996973,0.1028249,0.00007201241],"about_ca_topic_score_codex":0.005800274,"about_ca_topic_score_gemma":0.0064609116,"teacher_disagreement_score":0.005800274,"about_ca_system_score_codex":0.0028627368,"about_ca_system_score_gemma":0.0018717776,"threshold_uncertainty_score":0.020770729},"labels":[],"label_agreement":null},{"id":"W3018138076","doi":"10.1080/15623599.2020.1756028","title":"Construction workspace management: critical review and roadmap","year":2020,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Interdependence; Computer science; Task (project management); Space (punctuation); Process management; Work (physics); Scheduling (production processes); Management science; Construction engineering; Systems engineering; Operations management; Engineering; Artificial intelligence; Sociology","score_opus":0.01092682600490038,"score_gpt":0.2418711242796373,"score_spread":0.23094429827473692,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3018138076","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000106308755,0.9926462,0.00045684975,0.00455045,0.001503502,0.00003693504,0.000039607225,0.000014724228,0.00064548774],"genre_scores_gemma":[0.0013108394,0.9948396,0.0010826039,0.0014914488,0.000921456,0.00008563172,0.000068628244,0.000006921727,0.00019294019],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9938474,0.002064649,0.0015770107,0.00055346166,0.001644298,0.0003130685],"domain_scores_gemma":[0.92092323,0.05041629,0.004708471,0.0014774696,0.021140505,0.0013340202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018573081,0.0014996971,0.0026444457,0.018090377,0.0015749533,0.0050291894,0.0035453765,0.00425221,0.007588559],"category_scores_gemma":[0.043640345,0.0010431723,0.0023384609,0.01528737,0.003321318,0.008747596,0.0029075753,0.0042241695,0.0021108093],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013536462,0.00012307576,0.0005948891,0.13515289,0.00023375353,0.00035139217,0.0008625693,0.0007086082,0.00030831198,0.01323862,0.10010323,0.74818724],"study_design_scores_gemma":[0.000019126852,0.000118823125,0.0016220015,0.19733818,0.000443788,0.0007626203,0.001332837,0.00027665147,0.0001997223,0.010000173,0.78780735,0.00007872589],"about_ca_topic_score_codex":0.005323626,"about_ca_topic_score_gemma":0.008260555,"teacher_disagreement_score":0.018573081,"about_ca_system_score_codex":0.00535644,"about_ca_system_score_gemma":0.019198624,"threshold_uncertainty_score":0.098225},"labels":[],"label_agreement":null},{"id":"W3020815684","doi":"10.1016/j.promfg.2020.02.215","title":"Towards Sustainable Building Design: The Impact of Architectural Design Features on Cooling Energy Consumption and Cost in Saudi Arabia","year":2020,"lang":"en","type":"article","venue":"Procedia Manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Energy consumption; Architectural engineering; Key (lock); Engineering; Architectural design; Process (computing); Systems engineering; Design process; Building design; Computer science; Architecture; Operations management; Work in process","score_opus":0.02231019897234563,"score_gpt":0.24295533750427012,"score_spread":0.2206451385319245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020815684","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97301334,0.0013850589,0.009005022,0.00044381752,0.000010723818,0.00006740115,0.00015956235,0.00002628881,0.015888846],"genre_scores_gemma":[0.9870962,0.00090917334,0.010389629,0.000022534457,0.000001915675,0.000017139879,0.000100324694,0.0000087446815,0.001454395],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986444,0.0005240897,0.00004564293,0.00005277835,0.0006377091,0.000095409145],"domain_scores_gemma":[0.9989145,0.00031014896,0.00014123107,0.000051345898,0.000522347,0.0000604389],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020227174,0.00047187755,0.00018258583,0.001291855,0.00061238534,0.0021507065,0.00044650663,0.0004347772,0.002004409],"category_scores_gemma":[0.0022184628,0.0001894721,0.0003392439,0.0015769086,0.00052181905,0.00094030984,0.001047643,0.0003319821,0.00025290306],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006259252,0.00034711976,0.19331089,0.0011589611,0.00020259795,0.000815076,0.0069713993,0.25385803,0.020278942,0.044921312,0.0032754766,0.47423422],"study_design_scores_gemma":[0.000054096756,0.0013810935,0.44405648,0.00078979164,0.00028517877,0.00079710805,0.045532636,0.36132613,0.03930638,0.023306372,0.08296656,0.00019814057],"about_ca_topic_score_codex":0.033241954,"about_ca_topic_score_gemma":0.066052675,"teacher_disagreement_score":0.033241954,"about_ca_system_score_codex":0.0036945464,"about_ca_system_score_gemma":0.0019587146,"threshold_uncertainty_score":0.06609696},"labels":[],"label_agreement":null},{"id":"W3020990666","doi":"10.1016/j.jobe.2020.101431","title":"Maintenance workflow management in hospitals: An automated multi-agent facility management system","year":2020,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workflow; Schedule; Computerized maintenance management system; Facility management; Computer science; Process management; Unified Modeling Language; Process (computing); Workflow management system; Management system; Risk analysis (engineering); Systems engineering; Operations management; Preventive maintenance; Business; Reliability engineering; Engineering; Database","score_opus":0.009965288480925986,"score_gpt":0.22034915103794434,"score_spread":0.21038386255701835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3020990666","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.38163698,0.0004868485,0.5571613,0.0013794613,0.00022761578,0.0011475303,0.00177551,0.04590073,0.010284124],"genre_scores_gemma":[0.78355306,0.00018647761,0.21152678,0.00016157512,0.00004042118,0.0002795274,0.0011310544,0.00016829379,0.002952727],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995066,0.0001230195,0.00006273665,0.00011468056,0.00012944087,0.00006353085],"domain_scores_gemma":[0.9992982,0.00015705774,0.000113040645,0.00012207952,0.00014962634,0.0001600026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009381911,0.0006318932,0.0006436577,0.00084779836,0.0007964677,0.0014318048,0.0014436315,0.0010206603,0.0023159944],"category_scores_gemma":[0.0013812918,0.0003283516,0.00039193023,0.00060297304,0.0002195038,0.0009179871,0.0012011548,0.00050309044,0.00078322453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022920277,0.0028621291,0.025741367,0.0004965753,0.00048149977,0.001839953,0.0011385892,0.32206473,0.055110827,0.0072445963,0.029631954,0.5510957],"study_design_scores_gemma":[0.00015547103,0.00016784588,0.0031940679,0.00002124728,0.00009680401,0.00013089353,0.00015750318,0.9821582,0.005353306,0.0013028907,0.007220088,0.000041676994],"about_ca_topic_score_codex":0.006689181,"about_ca_topic_score_gemma":0.0057491832,"teacher_disagreement_score":0.006689181,"about_ca_system_score_codex":0.0008690482,"about_ca_system_score_gemma":0.0019179893,"threshold_uncertainty_score":0.013300538},"labels":[],"label_agreement":null},{"id":"W3021152059","doi":"10.2478/otmcj-2020-0005","title":"Qualitative analysis of Request For Information to identify design flaws in steel construction projects","year":2020,"lang":"en","type":"article","venue":"Organization Technology and Management in Construction An International Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Context (archaeology); Process (computing); Construction engineering; Implementation; Phase (matter); Construction management; Risk analysis (engineering); Engineering; Software engineering; Civil engineering; Business","score_opus":0.022118449603977755,"score_gpt":0.3127989345497795,"score_spread":0.29068048494580173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3021152059","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93497086,0.00020148292,0.041506283,0.0019823394,0.00003693001,0.0009212684,0.0006345703,0.00009260293,0.019653687],"genre_scores_gemma":[0.9853872,0.00011989912,0.011313443,0.00012549105,0.000005489536,0.0006715409,0.0001928687,0.000041545314,0.0021425248],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9581106,0.030103717,0.0012965167,0.00088880496,0.008143399,0.0014570584],"domain_scores_gemma":[0.7684174,0.19507846,0.008971748,0.0040332573,0.02236963,0.0011295169],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031719007,0.00049631664,0.00058155763,0.006815306,0.0034027013,0.0033408105,0.0017032495,0.0014557095,0.0031698248],"category_scores_gemma":[0.09073922,0.0005774887,0.00038012234,0.0059709805,0.0066007343,0.0034611926,0.0037630694,0.0013647388,0.00032548702],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016463034,0.00013552277,0.011972043,0.00068368734,0.000012775293,0.0009697122,0.9343679,0.0010456635,0.0035220273,0.01858415,0.0015428386,0.026999123],"study_design_scores_gemma":[0.000023857465,0.000108311346,0.01260887,0.000679403,0.000016288257,0.00024860475,0.9484621,0.0049020597,0.0047973506,0.008997495,0.01909193,0.00006359285],"about_ca_topic_score_codex":0.007948816,"about_ca_topic_score_gemma":0.007300393,"teacher_disagreement_score":0.031719007,"about_ca_system_score_codex":0.012392249,"about_ca_system_score_gemma":0.006783998,"threshold_uncertainty_score":0.16774821},"labels":[],"label_agreement":null},{"id":"W3022835966","doi":"10.18280/ijsdp.150318","title":"Development and Analysis of Prefabricated Concrete Buildings in Chengdu, China","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Fundamental Research Funds for the Central Universities","keywords":"China; Architectural engineering; Civil engineering; Engineering; Forensic engineering; Environmental science; Geography; Archaeology","score_opus":0.010211234676220586,"score_gpt":0.21960844593547585,"score_spread":0.20939721125925526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3022835966","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99775475,0.00022216179,0.00013974591,0.000019330719,0.0000011650923,0.00001639557,0.00029875187,0.000006143743,0.0015414667],"genre_scores_gemma":[0.9982679,0.0001768381,0.00033447298,0.0000031527807,0.000001183625,0.000009397477,0.00047236812,0.0000014376478,0.00073322986],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9996094,0.000038046324,0.000032858658,0.000056190875,0.00014450228,0.00011896174],"domain_scores_gemma":[0.99960023,0.0000446825,0.00012393178,0.000027529954,0.00013334883,0.000070290545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027128702,0.00031115112,0.00017368983,0.0046007065,0.00060542015,0.0006780664,0.00038175256,0.00019853392,0.0011231547],"category_scores_gemma":[0.00056700787,0.00020177418,0.0003006112,0.006409625,0.00026270104,0.000354895,0.00067266944,0.00013475587,0.00011365465],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008727339,0.00006617197,0.91668177,0.00021651725,0.000044424272,0.0023646601,0.0047178715,0.0052077775,0.0044883597,0.0020511264,0.00056050054,0.06351352],"study_design_scores_gemma":[0.0000015461923,0.000028095808,0.99585426,0.000009806499,0.000008402852,0.000080232385,0.0012552433,0.0011692804,0.00025456276,0.00005340655,0.0012801241,0.0000049988007],"about_ca_topic_score_codex":0.12767838,"about_ca_topic_score_gemma":0.2173834,"teacher_disagreement_score":0.12767838,"about_ca_system_score_codex":0.002625817,"about_ca_system_score_gemma":0.002129894,"threshold_uncertainty_score":0.25387043},"labels":[],"label_agreement":null},{"id":"W3024415211","doi":"10.1016/j.asoc.2020.106400","title":"Neuro-fuzzy system dynamics technique for modeling construction systems","year":2020,"lang":"en","type":"article","venue":"Applied Soft Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Probabilistic logic; System dynamics; Fuzzy logic; Neuro-fuzzy; Complex system; Industrial engineering; Fuzzy control system; Reliability engineering; Artificial intelligence; Engineering","score_opus":0.01081686977004623,"score_gpt":0.19088033237968324,"score_spread":0.18006346260963701,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3024415211","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005149187,0.00026602912,0.99011225,0.0000689411,0.000039357616,0.000020126994,0.00004744646,0.00014497282,0.0041517373],"genre_scores_gemma":[0.76740414,0.0009828974,0.22113791,0.000071135895,0.000070098125,0.00028490718,0.00013717636,0.00005698415,0.009854762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99987984,0.00003289103,0.000007881564,0.000020088826,0.00005030425,0.000008989344],"domain_scores_gemma":[0.9998853,0.00005208105,0.000010939688,0.000008436269,0.000039260834,0.000003963733],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035550335,0.00048387214,0.00066030776,0.0005045081,0.00059202226,0.00059929903,0.00067227177,0.00067189353,0.0018205747],"category_scores_gemma":[0.00059788954,0.00030885116,0.0006510498,0.0005616931,0.00029798373,0.0006596395,0.00041905008,0.0009624152,0.0005489732],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015089444,0.000014205764,0.00015984551,0.00005842059,0.000029629895,0.00005563872,0.000050310286,0.95728815,0.0019772605,0.015087149,0.00037343954,0.024890892],"study_design_scores_gemma":[9.66395e-7,0.000005258818,0.000041974665,0.0000043336768,0.0000042708652,0.000007767132,0.000004110782,0.9971661,0.00025843532,0.0019385016,0.00056599855,0.0000023622267],"about_ca_topic_score_codex":0.012455547,"about_ca_topic_score_gemma":0.012107221,"teacher_disagreement_score":0.012455547,"about_ca_system_score_codex":0.0005006989,"about_ca_system_score_gemma":0.00079042686,"threshold_uncertainty_score":0.024766088},"labels":[],"label_agreement":null},{"id":"W3027860668","doi":"10.23977/engsm.2019.11001","title":"Numerical Simulation of Construction Process of Large Building Project Based on Discrete Element Method","year":2019,"lang":"en","type":"article","venue":"Engineering Solid Mechanics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Vibration; Structural engineering; Discrete element method; Process (computing); Engineering; Finite element method; Aggregate (composite); Stadium; Mechanical engineering; Materials science; Computer science; Composite material","score_opus":0.006433851530521069,"score_gpt":0.2749914713416064,"score_spread":0.26855761981108534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3027860668","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20612603,0.0006593091,0.74800026,0.00057111634,0.0002792609,0.0002182216,0.0009589827,0.0013425619,0.04184424],"genre_scores_gemma":[0.92280596,0.00040481816,0.06506206,0.00007159592,0.000032515476,0.0004088497,0.00065009313,0.000099218494,0.010464855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997489,0.00005490886,0.000015349724,0.000039578837,0.000094955285,0.00004620973],"domain_scores_gemma":[0.9997092,0.00012928316,0.000031245436,0.00002153963,0.00008039279,0.000028296035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033301645,0.0005145199,0.00083478756,0.0006241996,0.00067115336,0.00080726936,0.0010046015,0.0014635797,0.0054049776],"category_scores_gemma":[0.00080636324,0.0004518272,0.0007592827,0.00063875964,0.0005940367,0.0005892742,0.00063059677,0.00067067135,0.00046168594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021989568,0.00002308072,0.00085350964,0.000044697765,0.000010286772,0.000054165706,0.000042760097,0.99243647,0.0010937913,0.0020661603,0.00027619384,0.0030769955],"study_design_scores_gemma":[0.0000053143954,0.0000055841388,0.00010549155,0.0000031067136,0.0000020232148,0.0000058801274,0.000009556958,0.9990971,0.00018032518,0.00023261177,0.00035044068,0.000002594457],"about_ca_topic_score_codex":0.013982114,"about_ca_topic_score_gemma":0.006082014,"teacher_disagreement_score":0.013982114,"about_ca_system_score_codex":0.0005578274,"about_ca_system_score_gemma":0.0007647364,"threshold_uncertainty_score":0.027801454},"labels":[],"label_agreement":null},{"id":"W3029097617","doi":"10.1108/ecam-01-2020-0017","title":"BIM-based life-cycle environmental assessment of prefabricated buildings","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":73,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Prefabrication; Building information modeling; Resource consumption; Life-cycle assessment; Apartment; Environmental impact assessment; Architectural engineering; Resource (disambiguation); Engineering; Construction engineering; Civil engineering; Environmental resource management; Computer science; Environmental science; Operations management; Production (economics)","score_opus":0.004704900180745781,"score_gpt":0.1798748500605162,"score_spread":0.17516994987977041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3029097617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6330246,0.0008138352,0.33890867,0.00015438319,0.000034830744,0.0003614802,0.0017318027,0.000612,0.024358405],"genre_scores_gemma":[0.9321291,0.00035267227,0.06475039,0.0000140583925,0.0000046436567,0.00012658213,0.0010962166,0.0000414704,0.0014849197],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99889827,0.00034440446,0.00004147844,0.00008151664,0.0005540225,0.00008033118],"domain_scores_gemma":[0.99941576,0.00013671521,0.00010524107,0.00009143085,0.00022606057,0.000024929765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010259378,0.00078066497,0.00040955478,0.0028109658,0.00035623106,0.0014740946,0.0006495032,0.00045835134,0.0016439877],"category_scores_gemma":[0.001910584,0.00031240607,0.00071831205,0.0024728114,0.0003164677,0.0014060108,0.001174147,0.00031507536,0.00033675996],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002232058,0.00028364218,0.03694229,0.00037611858,0.00012895316,0.0002546595,0.00031854032,0.7382524,0.011333213,0.0072263433,0.0008962027,0.20376444],"study_design_scores_gemma":[0.000012215382,0.00023797147,0.04307639,0.0000866309,0.00006737427,0.00020663512,0.0006280066,0.93553853,0.009953618,0.0044970913,0.0056434767,0.000052069903],"about_ca_topic_score_codex":0.005238859,"about_ca_topic_score_gemma":0.009472993,"teacher_disagreement_score":0.005238859,"about_ca_system_score_codex":0.0010816396,"about_ca_system_score_gemma":0.0008547853,"threshold_uncertainty_score":0.010416746},"labels":[],"label_agreement":null},{"id":"W3030530198","doi":"10.3311/ppar.14655","title":"Enabling Automatic LCA at Any Stage of the Building Based on Its BIM Model","year":2020,"lang":"en","type":"article","venue":"Periodica Polytechnica Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Hôpital Notre-Dame","funders":"Hydro-Québec","keywords":"Building information modeling; Interoperability; Process (computing); Computer science; Information model; Life-cycle assessment; Domain (mathematical analysis); Software engineering; Systems engineering; Process management; Construction engineering; Engineering; Production (economics); World Wide Web; Operations management","score_opus":0.015541562279188641,"score_gpt":0.21904321525177303,"score_spread":0.20350165297258438,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3030530198","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008512548,0.00007293284,0.97366524,0.00013416256,0.00002635974,0.00013715577,0.0002945667,0.0051448653,0.012012191],"genre_scores_gemma":[0.21278761,0.0002755525,0.7798659,0.00009122042,0.000022895476,0.00037851176,0.0019532042,0.0010931339,0.0035319624],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972825,0.00054996694,0.0001442685,0.0003295603,0.0014919976,0.0002016484],"domain_scores_gemma":[0.9978048,0.00062239147,0.00013479363,0.0008351616,0.0005265169,0.00007636947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023004077,0.00095362985,0.0007701577,0.0029353062,0.00093577843,0.0035019158,0.0014635231,0.0008409559,0.004839982],"category_scores_gemma":[0.0055523016,0.00067577104,0.0011556349,0.0017918888,0.0010817838,0.0038367,0.0040768133,0.0013227995,0.002404081],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037442893,0.00035366102,0.0049167397,0.000533805,0.00008245288,0.00060007407,0.0032426985,0.18473865,0.059838045,0.14792044,0.015174804,0.58222425],"study_design_scores_gemma":[0.000038077676,0.000107410866,0.0031860694,0.000337822,0.00006759552,0.00044367343,0.0009076622,0.7276009,0.07920336,0.05029028,0.13764443,0.00017269453],"about_ca_topic_score_codex":0.0050365864,"about_ca_topic_score_gemma":0.0050644125,"teacher_disagreement_score":0.0050365864,"about_ca_system_score_codex":0.0012799255,"about_ca_system_score_gemma":0.0020431126,"threshold_uncertainty_score":0.016191363},"labels":[],"label_agreement":null},{"id":"W303161768","doi":"10.5957/jsp.2008.24.4.221","title":"A Computer Simulation Approach to Improving Tugboat Shipbuilding Design and Development Productivity","year":2008,"lang":"en","type":"article","venue":"Journal of Ship Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dalhousie University","funders":"","keywords":"Shipbuilding; Shipyard; Vendor; Naval architecture; Piping; Manufacturing engineering; Productivity; Engineering; Process (computing); Operations research; Computer science; Engineering drawing; Marine engineering; Mechanical engineering","score_opus":0.03919690532133227,"score_gpt":0.22074021172357128,"score_spread":0.181543306402239,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W303161768","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20094994,0.00030876245,0.7521431,0.0005570457,0.00007418348,0.00028533483,0.00024139833,0.0021980817,0.04324219],"genre_scores_gemma":[0.71004397,0.00053264713,0.2816357,0.000054908865,0.000013600868,0.00052265724,0.00026773158,0.00014412083,0.0067846063],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995136,0.00024084885,0.00001729898,0.00004937024,0.00013170083,0.000047241097],"domain_scores_gemma":[0.9990256,0.00055737206,0.000052372274,0.00009412134,0.00022461894,0.00004594081],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00067191274,0.00059339305,0.00051490066,0.0008262974,0.0005879864,0.0011834403,0.00096170156,0.00069330964,0.0039627426],"category_scores_gemma":[0.0026237085,0.00049258576,0.00046412568,0.0011235381,0.00047848333,0.00071196345,0.00066439004,0.00071586727,0.00030036655],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007509335,0.00006436153,0.0008799121,0.000028503768,0.000015306869,0.000030733627,0.00008500066,0.9711623,0.0013995721,0.0075816824,0.0003684768,0.018309051],"study_design_scores_gemma":[0.00001299573,0.000025407036,0.00014522215,0.000006125987,0.0000084648245,0.000008115769,0.00002220418,0.99676573,0.0006138309,0.0009485871,0.001439137,0.000004229683],"about_ca_topic_score_codex":0.030318746,"about_ca_topic_score_gemma":0.023819882,"teacher_disagreement_score":0.030318746,"about_ca_system_score_codex":0.0018541683,"about_ca_system_score_gemma":0.0032634854,"threshold_uncertainty_score":0.060284495},"labels":[],"label_agreement":null},{"id":"W3033110589","doi":"10.1016/j.autcon.2020.103257","title":"Building automation system - BIM integration using a linked data structure","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":88,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University; Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada; Ontario Research Foundation","keywords":"Building information modeling; Automation; Systems engineering; Engineering; System integration; Building automation; Computer science; Construction engineering; Manufacturing engineering; Software engineering; Database; Operations management; Mechanical engineering","score_opus":0.030483981159701218,"score_gpt":0.25483156291155845,"score_spread":0.22434758175185723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033110589","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030038785,0.00017551478,0.9306874,0.00031848313,0.000116800264,0.00037149995,0.002212237,0.017485842,0.018593334],"genre_scores_gemma":[0.42220247,0.00032416187,0.5535091,0.00024987574,0.000065163906,0.00043257742,0.01116247,0.0009034417,0.011150679],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9973049,0.0004925751,0.00024803024,0.00032425718,0.0014759626,0.00015426594],"domain_scores_gemma":[0.9985807,0.00026533572,0.000097673015,0.00051323435,0.0004726083,0.00007043039],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022147852,0.00062622194,0.00069082424,0.0036262032,0.0010535747,0.004138236,0.0012575621,0.0011233991,0.0051640794],"category_scores_gemma":[0.0035676518,0.0006459893,0.0010705598,0.0031144666,0.0006617425,0.0032416803,0.0031612706,0.0010187577,0.0031069044],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069811504,0.0012840643,0.015606233,0.0006543234,0.0004724683,0.0009158687,0.0017112899,0.11979127,0.049944967,0.20993415,0.03258815,0.56639916],"study_design_scores_gemma":[0.00015889002,0.0002999715,0.009658393,0.00024575475,0.0003460724,0.0005906527,0.00048160198,0.6764261,0.11596935,0.061950512,0.13368116,0.00019152019],"about_ca_topic_score_codex":0.00541625,"about_ca_topic_score_gemma":0.0051304325,"teacher_disagreement_score":0.00541625,"about_ca_system_score_codex":0.0011506934,"about_ca_system_score_gemma":0.002723902,"threshold_uncertainty_score":0.017275572},"labels":[],"label_agreement":null},{"id":"W3033566057","doi":"10.1108/f-08-2019-0088","title":"Critical lifting simulation of heavy industrial construction in gaming environment","year":2020,"lang":"en","type":"article","venue":"Facilities","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Lifting equipment; Process (computing); Dimension (graph theory); Visualization; Industrial engineering; Engineering; Computer science; Simulation; Systems engineering; Mechanical engineering","score_opus":0.034178894995787336,"score_gpt":0.22130999115793953,"score_spread":0.1871310961621522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3033566057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.844977,0.00012201551,0.1337638,0.00010937514,0.000053240008,0.0004647546,0.0005772037,0.0008550554,0.019077493],"genre_scores_gemma":[0.9691306,0.00006868795,0.027666535,0.000017408092,0.0000036078677,0.0001725141,0.00025604118,0.000041195228,0.0026435002],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997993,0.00007269262,0.000010781346,0.000024029458,0.000057867685,0.000035310175],"domain_scores_gemma":[0.9996418,0.00020084475,0.00002572853,0.000028994285,0.000052008316,0.000050670435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036420499,0.0006271668,0.00034864433,0.0004140652,0.00040193537,0.0007374539,0.001049702,0.00061161333,0.004094765],"category_scores_gemma":[0.0006307933,0.00019513606,0.00053542113,0.00020926404,0.0005070021,0.0003328466,0.0009578523,0.00034043973,0.00024959492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004235722,0.00035259983,0.005345977,0.00020050786,0.000035691304,0.00049793307,0.0006007474,0.96379596,0.011380727,0.003578285,0.00075360807,0.0130344],"study_design_scores_gemma":[0.00003131592,0.00015424693,0.0017663133,0.000019460489,0.000012999345,0.000049327744,0.0001424024,0.99270236,0.0027545008,0.0008502234,0.0015028897,0.000013967066],"about_ca_topic_score_codex":0.009617502,"about_ca_topic_score_gemma":0.009169856,"teacher_disagreement_score":0.009617502,"about_ca_system_score_codex":0.00046768162,"about_ca_system_score_gemma":0.0006046324,"threshold_uncertainty_score":0.019123077},"labels":[],"label_agreement":null},{"id":"W3034366985","doi":"10.48550/arxiv.2004.12485","title":"Learning To Navigate The Synthetically Accessible Chemical Space Using\\n Reinforcement Learning","year":2020,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; HEC Montréal","funders":"","keywords":"Reinforcement learning; Space (punctuation); Chemical space; Computer science; Reinforcement; Human–computer interaction; Artificial intelligence; Engineering; Biology; Bioinformatics","score_opus":0.04460590330305823,"score_gpt":0.1891779005994102,"score_spread":0.14457199729635198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034366985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.052991442,0.000460011,0.9404779,0.00036384177,0.000057303485,0.00008887296,0.000058517227,0.0011807157,0.0043213894],"genre_scores_gemma":[0.7952604,0.000421531,0.1994325,0.00033903786,0.000045939654,0.00023677011,0.0002254743,0.00012429415,0.0039140405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976903,0.000066116554,0.000011255307,0.000069746864,0.000053668013,0.000030265282],"domain_scores_gemma":[0.9992009,0.0005579097,0.00006882512,0.00006532178,0.00006608825,0.00004094857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00066473964,0.0008719492,0.00064416986,0.00027597393,0.00023507193,0.0005604113,0.0010855668,0.0010011676,0.0022368769],"category_scores_gemma":[0.00193089,0.0004158046,0.00053459883,0.0001912826,0.0010970007,0.00070894475,0.0009059815,0.0013736769,0.00038783293],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037331098,0.000041941996,0.00036858395,0.000066921566,0.000019796244,0.000041152067,0.000029105671,0.9614254,0.0025481537,0.0059048817,0.00042248928,0.029094256],"study_design_scores_gemma":[0.00000662541,0.00002055568,0.000022018645,0.0000028883278,0.0000020788812,0.0000053181657,0.0000021649087,0.9974251,0.00063225836,0.0016450176,0.00023409897,0.0000019059008],"about_ca_topic_score_codex":0.0027948658,"about_ca_topic_score_gemma":0.0033992704,"teacher_disagreement_score":0.0027948658,"about_ca_system_score_codex":0.00080195634,"about_ca_system_score_gemma":0.0011815452,"threshold_uncertainty_score":0.007483065},"labels":[],"label_agreement":null},{"id":"W3034774777","doi":"10.1108/ci-11-2019-0133","title":"Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies","year":2020,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":94,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Workflow; Building information modeling; Workflow technology; Computer science; Workflow engine; Systems engineering; Process (computing); Information flow; Business process; Workflow management system; Process management; Software engineering; Engineering; Database; Operations management; Work in process","score_opus":0.03393388412887537,"score_gpt":0.2387419833636484,"score_spread":0.20480809923477303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3034774777","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27499416,0.00035795633,0.7052849,0.00073631335,0.000046759134,0.0011281251,0.0003793941,0.002562584,0.014509874],"genre_scores_gemma":[0.4762068,0.0002881048,0.52136797,0.000039098097,0.000005571938,0.0003005321,0.0003328424,0.00010976758,0.0013493128],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9968142,0.0014628334,0.0002618942,0.00033840016,0.0008534256,0.0002692643],"domain_scores_gemma":[0.9929824,0.003332748,0.0011098946,0.0014152378,0.0008357997,0.00032389723],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005807048,0.000958669,0.0004770649,0.0019442156,0.0015038471,0.003113676,0.0014750747,0.0007846308,0.0038434872],"category_scores_gemma":[0.010584671,0.00072132796,0.0008167747,0.0020144791,0.00094563304,0.0037018831,0.0023647074,0.0009500088,0.0007099626],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004224462,0.00080973294,0.018665498,0.00067869306,0.00005706593,0.00049503864,0.0049619596,0.4810909,0.015397872,0.021106808,0.0022244875,0.4540895],"study_design_scores_gemma":[0.00016641633,0.0008369934,0.020640124,0.0006021986,0.00016033954,0.0004128144,0.0063969693,0.8572935,0.04102965,0.031394184,0.04075646,0.0003104021],"about_ca_topic_score_codex":0.008470733,"about_ca_topic_score_gemma":0.012925394,"teacher_disagreement_score":0.008470733,"about_ca_system_score_codex":0.0023376124,"about_ca_system_score_gemma":0.006458941,"threshold_uncertainty_score":0.030710936},"labels":[],"label_agreement":null},{"id":"W3035558579","doi":"10.1061/(asce)me.1943-5479.0000815","title":"Fuzzy Agent-Based Multicriteria Decision-Making Model for Analyzing Construction Crew Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Crew; Multiple-criteria decision analysis; Scope (computer science); Process (computing); Computer science; Operations research; Fuzzy logic; Decision support system; Decision-making models; Management science; Risk analysis (engineering); Engineering; Artificial intelligence; Business","score_opus":0.014321942958857596,"score_gpt":0.22967911140850905,"score_spread":0.21535716844965144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035558579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044651903,0.00034138575,0.9423035,0.00085805135,0.00008430833,0.00018075346,0.00024460422,0.00019349268,0.011141996],"genre_scores_gemma":[0.8459791,0.00044234112,0.14460653,0.00014199741,0.00005148994,0.00053894933,0.0002132748,0.000025645468,0.008000521],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99906915,0.00041154237,0.000045319615,0.00018198449,0.00017126687,0.00012076383],"domain_scores_gemma":[0.99885035,0.0006597547,0.00016686515,0.00003548146,0.0002041558,0.00008334872],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001968598,0.0010594598,0.0012130153,0.0010290615,0.00087175885,0.0021324686,0.0019765603,0.0021989243,0.0037965812],"category_scores_gemma":[0.0028523973,0.00055044895,0.0010147884,0.0011032011,0.0008346642,0.0013491394,0.0010484587,0.0015158021,0.00041615794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003428211,0.000035891728,0.0004843704,0.000024587485,0.00003476043,0.000076746226,0.00007265175,0.9798747,0.00027379053,0.015175623,0.00028597063,0.0036266858],"study_design_scores_gemma":[0.0000065165796,0.000010792176,0.000057179965,0.0000035873109,0.00000627594,0.0000046719847,0.000013223795,0.9969408,0.000045954817,0.002677769,0.00022897303,0.000004237484],"about_ca_topic_score_codex":0.0154606495,"about_ca_topic_score_gemma":0.013018144,"teacher_disagreement_score":0.0154606495,"about_ca_system_score_codex":0.0025193167,"about_ca_system_score_gemma":0.0022932203,"threshold_uncertainty_score":0.030741274},"labels":[],"label_agreement":null},{"id":"W3035817401","doi":"10.36680/j.itcon.2020.019","title":"Change management practices for adopting new technologies in the design and construction industry","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Change management (ITSM); Context (archaeology); Change order; Business; Order (exchange); Critical success factor; Knowledge management; Best practice; Marketing; Operations management; Process management; Engineering; Computer science; Project management; Program management; Management; OPM3; Economics","score_opus":0.0348342904175412,"score_gpt":0.25000134206153457,"score_spread":0.21516705164399336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3035817401","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.987166,0.00053401385,0.0034267309,0.0015887592,0.000017568376,0.00013457745,0.000016765316,0.00004228682,0.007073277],"genre_scores_gemma":[0.9961481,0.0002878716,0.0028569377,0.0001302595,0.000005858852,0.000038757185,0.000018951028,0.0000047284266,0.00050856185],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.98965245,0.004751874,0.0008166177,0.0006788803,0.0034138479,0.00068632455],"domain_scores_gemma":[0.95625985,0.02075849,0.012495037,0.0017740384,0.006428424,0.0022842386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008840007,0.00018776608,0.00017064142,0.0030416125,0.0020827705,0.0026686813,0.0006784093,0.00095115264,0.0008812761],"category_scores_gemma":[0.044810887,0.00022187288,0.0003384562,0.002191469,0.0016287992,0.0017351956,0.0018971395,0.001070389,0.00013338159],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041301097,0.0007162497,0.65863544,0.00032926444,0.000051806543,0.00048093824,0.10958909,0.0005144752,0.0033089805,0.0032774657,0.000977547,0.22207755],"study_design_scores_gemma":[0.000014950267,0.00043056151,0.8368561,0.00048285164,0.000046151094,0.0006962822,0.13997203,0.002525578,0.0018152524,0.0016599919,0.0154258115,0.00007448761],"about_ca_topic_score_codex":0.005527983,"about_ca_topic_score_gemma":0.010830309,"teacher_disagreement_score":0.008840007,"about_ca_system_score_codex":0.0031438428,"about_ca_system_score_gemma":0.0048271897,"threshold_uncertainty_score":0.046751022},"labels":[],"label_agreement":null},{"id":"W3036097659","doi":"10.1520/stp161720190154","title":"Unintended Consequences: A Review of Critical Details, Serviceability, and Durability of Modern High-Performance Facades","year":2020,"lang":"en","type":"review","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Intertek (Canada)","funders":"","keywords":"Serviceability (structure); Durability; Unintended consequences; Architectural engineering; Engineering; Computer science; Civil engineering; Political science; Law","score_opus":0.0345478144276214,"score_gpt":0.2888057958446752,"score_spread":0.2542579814170538,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036097659","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00067593245,0.9915549,0.0009821575,0.0018873354,0.00081690226,0.000014422558,0.000019423282,0.000014523052,0.004034328],"genre_scores_gemma":[0.0077794218,0.98747116,0.001014803,0.0015792839,0.000847361,0.000027128739,0.000039530736,0.000019064219,0.001222309],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99567574,0.0010823061,0.00067599537,0.0003791396,0.001958886,0.00022796848],"domain_scores_gemma":[0.97014576,0.020846274,0.0026314703,0.00058861135,0.005378053,0.0004097371],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0058389865,0.0013590299,0.0009945784,0.007378468,0.0016934911,0.00433496,0.0019318617,0.0026870742,0.002338086],"category_scores_gemma":[0.021016188,0.0006844185,0.00085741444,0.0051861224,0.0055458657,0.006108223,0.0017302955,0.0034051957,0.0007950584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008900589,0.00010894242,0.002495481,0.028661726,0.0001493092,0.00093185564,0.0040067937,0.0023490137,0.0012463223,0.07739223,0.104169406,0.7783998],"study_design_scores_gemma":[0.0000035811343,0.00009537991,0.002831047,0.028009506,0.0000936966,0.00084379315,0.001301369,0.00024411925,0.0005806887,0.011157275,0.9547895,0.000050082446],"about_ca_topic_score_codex":0.010104758,"about_ca_topic_score_gemma":0.0135720465,"teacher_disagreement_score":0.010104758,"about_ca_system_score_codex":0.004958729,"about_ca_system_score_gemma":0.006577587,"threshold_uncertainty_score":0.035978317},"labels":[],"label_agreement":null},{"id":"W3036302401","doi":"10.1108/jedt-02-2020-0044","title":"BIM-based integrated solution for analysis and management of mismatches during construction","year":2020,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Reliability (semiconductor); Process (computing); Building information modeling; Computer science; Project management; Risk analysis (engineering); Software; Reliability engineering; Engineering; Systems engineering; Operations management","score_opus":0.010150996734554395,"score_gpt":0.18808213663088366,"score_spread":0.17793113989632928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3036302401","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033462632,0.00029905405,0.95108515,0.0005566445,0.00006709867,0.0006727465,0.0007425294,0.0023667233,0.010747383],"genre_scores_gemma":[0.28571117,0.00030220635,0.7097389,0.00010852693,0.000013580213,0.0006888277,0.0011807666,0.00013645261,0.0021195465],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9932227,0.0026104283,0.00051478366,0.00064458395,0.0026380825,0.00036935066],"domain_scores_gemma":[0.9959858,0.0012660418,0.0006531319,0.00067064556,0.0012269968,0.00019740085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006100629,0.001423237,0.0013144723,0.0071096146,0.0015170022,0.004170906,0.002155135,0.0018027554,0.006016648],"category_scores_gemma":[0.011319409,0.0009984404,0.0013378813,0.006167811,0.00093744276,0.004307097,0.0053751627,0.0012052836,0.0012429713],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048561775,0.0010388839,0.021772683,0.001336272,0.00032640994,0.0008528854,0.0046934523,0.25187972,0.013251499,0.043877028,0.011464685,0.6490209],"study_design_scores_gemma":[0.000060063998,0.00028123832,0.009662706,0.00038395217,0.00019574727,0.00038878867,0.005257437,0.9203568,0.007938675,0.028251428,0.02707746,0.00014559636],"about_ca_topic_score_codex":0.005202254,"about_ca_topic_score_gemma":0.00858211,"teacher_disagreement_score":0.0071096146,"about_ca_system_score_codex":0.0017169717,"about_ca_system_score_gemma":0.004245871,"threshold_uncertainty_score":0.032263577},"labels":[],"label_agreement":null},{"id":"W3037746521","doi":"10.1108/ecam-06-2019-0314","title":"Exploring and verifying BIM-based energy simulation for building operations","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Building information modeling; Energy consumption; Unavailability; Simulation software; Computer science; Process (computing); Systems engineering; Schedule; Building energy simulation; Energy modeling; Software; Reliability engineering; Simulation; Engineering; Energy performance; Operating system","score_opus":0.03669529932917424,"score_gpt":0.21118488170000682,"score_spread":0.1744895823708326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3037746521","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29101422,0.0002053822,0.6750347,0.00050764804,0.00013595962,0.0004370565,0.0011181105,0.00507765,0.026469164],"genre_scores_gemma":[0.8876849,0.00013998042,0.10972565,0.000056787554,0.000009814062,0.00023415251,0.00074963004,0.00017404338,0.00122494],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974268,0.0009962292,0.00017098176,0.00020185055,0.0010461443,0.00015795999],"domain_scores_gemma":[0.9968811,0.0014014301,0.00022704608,0.0007999739,0.0006189187,0.00007150899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037593674,0.00083088945,0.00059237477,0.0010897808,0.0007220729,0.0019795331,0.0014993007,0.0010733958,0.002911889],"category_scores_gemma":[0.0077133863,0.00047598497,0.001016232,0.00076252787,0.0012720665,0.0018821573,0.0019128954,0.0008422723,0.00057157414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013020466,0.00015681853,0.004021726,0.0001188927,0.00003678673,0.00016102819,0.00019915415,0.94886863,0.00354933,0.02454197,0.0005855995,0.017629765],"study_design_scores_gemma":[0.000018811055,0.000044566823,0.00075487985,0.000028906608,0.000011796358,0.000033416847,0.000098070814,0.9881344,0.004676346,0.0032023625,0.0029815843,0.000014800408],"about_ca_topic_score_codex":0.011682187,"about_ca_topic_score_gemma":0.0063556395,"teacher_disagreement_score":0.011682187,"about_ca_system_score_codex":0.0016178117,"about_ca_system_score_gemma":0.002866331,"threshold_uncertainty_score":0.023228347},"labels":[],"label_agreement":null},{"id":"W3038353914","doi":"10.1177/1478077120934126","title":"Generative systems in the architecture, engineering and construction industry: A systematic review and analysis","year":2020,"lang":"en","type":"review","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":49,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"LEAPS; Architecture; Generative grammar; Generative Design; Systems engineering; Engineering; Engineering management; Computer science; Software engineering; Management science; Artificial intelligence; Operations management; Business","score_opus":0.013808157388896325,"score_gpt":0.2622755155685924,"score_spread":0.2484673581796961,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3038353914","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00049946975,0.9981856,0.00032391673,0.0002846216,0.000053544903,0.00008254124,0.00010423747,0.0000054507827,0.000460552],"genre_scores_gemma":[0.0056137717,0.9928289,0.0009307082,0.00025769658,0.00003153869,0.00013493652,0.000098519544,0.0000037807552,0.00010017623],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9954496,0.0016731849,0.0011982641,0.0003512244,0.001185743,0.00014192582],"domain_scores_gemma":[0.9725677,0.021699183,0.002437883,0.00048322562,0.002579826,0.0002321695],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007861819,0.0010531151,0.0028110044,0.0168092,0.0007191858,0.0023042087,0.0015843577,0.0012528623,0.0032464818],"category_scores_gemma":[0.02475531,0.0007768384,0.0028889421,0.016601436,0.0011772184,0.00292278,0.0016817118,0.0012274822,0.00046246164],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006911401,0.000058231206,0.0015751818,0.654585,0.002027526,0.00026510638,0.0013634247,0.00032278537,0.00031168872,0.004295008,0.0064511234,0.32867578],"study_design_scores_gemma":[0.000051720363,0.00016678653,0.0055835703,0.7667058,0.011735504,0.0010761253,0.0019494478,0.00021571848,0.00038694768,0.0028536548,0.20920272,0.00007203646],"about_ca_topic_score_codex":0.008330782,"about_ca_topic_score_gemma":0.02841982,"teacher_disagreement_score":0.0168092,"about_ca_system_score_codex":0.002619944,"about_ca_system_score_gemma":0.015550574,"threshold_uncertainty_score":0.041577816},"labels":[],"label_agreement":null},{"id":"W3039556242","doi":"10.1108/ecam-01-2019-0069","title":"A decision support tool for planning module installation in industrial construction","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Plan (archaeology); Heuristic; Swing; Systems engineering; Engineering; Computer science; Industrial engineering; Operations research; Mechanical engineering","score_opus":0.015953008632236886,"score_gpt":0.2118610136929956,"score_spread":0.1959080050607587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039556242","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017836234,0.00010831934,0.97193855,0.00014303268,0.000025718778,0.00034745727,0.00092679786,0.0039576027,0.0047164094],"genre_scores_gemma":[0.13769214,0.00013993,0.8590408,0.000051181705,0.000010140653,0.00048177244,0.00094767794,0.00013381636,0.001502544],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994024,0.00018333028,0.000059289752,0.000118313765,0.00017267035,0.000064009575],"domain_scores_gemma":[0.9984522,0.0010795037,0.00013684547,0.00007998142,0.00017450501,0.00007693133],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013842131,0.0012782728,0.00082167116,0.0015614704,0.000732473,0.0015946985,0.0018075797,0.0012548467,0.011072953],"category_scores_gemma":[0.0027964315,0.0008370497,0.0007218747,0.0012956194,0.00045583746,0.0009543715,0.0009930577,0.0008698807,0.0013191219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019670815,0.0002997788,0.0016336172,0.00050040457,0.00006433713,0.0004214287,0.00024375891,0.745897,0.004997343,0.010922068,0.0052837734,0.22953987],"study_design_scores_gemma":[0.000072103336,0.00008928513,0.0002990191,0.00006271506,0.00002799046,0.00007644868,0.00009935449,0.9850305,0.002253828,0.0054509826,0.006515815,0.000022050042],"about_ca_topic_score_codex":0.0073301615,"about_ca_topic_score_gemma":0.010425956,"teacher_disagreement_score":0.011072953,"about_ca_system_score_codex":0.00095440156,"about_ca_system_score_gemma":0.0023814815,"threshold_uncertainty_score":0.037042737},"labels":[],"label_agreement":null},{"id":"W3039813675","doi":"10.1108/jfm-04-2020-0024","title":"Information commissioning: bridging the gap between digital and physical built assets","year":2020,"lang":"en","type":"article","venue":"Journal of Facilities Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Project commissioning; Asset (computer security); Computer science; Process management; Building information modeling; Bridging (networking); Process (computing); Information system; Originality; Information model; Risk analysis (engineering); Business; Operations management; Publishing; Engineering; Computer security","score_opus":0.018364757950286935,"score_gpt":0.2147569941793794,"score_spread":0.19639223622909247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3039813675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7122434,0.004745411,0.14920342,0.029707529,0.00023557874,0.00053243287,0.00020038625,0.0005822198,0.10254968],"genre_scores_gemma":[0.96349084,0.0008664447,0.033216227,0.00051788625,0.000042618427,0.00008916145,0.00009986808,0.00006310717,0.0016138264],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9620515,0.02223456,0.0021106473,0.001602601,0.0097964145,0.0022042764],"domain_scores_gemma":[0.83159465,0.12573633,0.014400319,0.016060973,0.0088380175,0.003369807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.031379227,0.00045341108,0.00048046734,0.0035695303,0.0043891766,0.01304839,0.00208799,0.0022641218,0.0041400227],"category_scores_gemma":[0.08326717,0.0005169267,0.00040866327,0.004528666,0.009444989,0.017559148,0.0097020045,0.0024250802,0.00067453505],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026121287,0.00043862392,0.042729687,0.0023709838,0.000054816774,0.0021343832,0.17270298,0.004843371,0.005184175,0.17391141,0.0055462625,0.58982205],"study_design_scores_gemma":[0.00007850874,0.0011591939,0.06981059,0.007572274,0.00015240535,0.0042336415,0.38539997,0.015724458,0.015760684,0.14704956,0.352825,0.00023379756],"about_ca_topic_score_codex":0.005263443,"about_ca_topic_score_gemma":0.0042313808,"teacher_disagreement_score":0.031379227,"about_ca_system_score_codex":0.006410375,"about_ca_system_score_gemma":0.011451284,"threshold_uncertainty_score":0.16595119},"labels":[],"label_agreement":null},{"id":"W3041435860","doi":"10.1007/s11831-020-09457-7","title":"What is at the Root of Construction 4.0: A Systematic Review of the Recent Research Effort","year":2020,"lang":"en","type":"review","venue":"Archives of Computational Methods in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Data science; Emerging technologies; Computer science; Big data; Order (exchange); The Internet; Domain (mathematical analysis); Position (finance); Meaning (existential); Knowledge management; Business; World Wide Web; Data mining; Epistemology; Artificial intelligence","score_opus":0.05266108419311241,"score_gpt":0.3889398032345506,"score_spread":0.33627871904143813,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3041435860","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00020934397,0.998804,0.0001569883,0.0004134537,0.00007399834,0.000027103591,0.00010924248,0.000003627541,0.00020222296],"genre_scores_gemma":[0.003026218,0.9956234,0.00060258707,0.00045611698,0.00006152757,0.000067038076,0.00009975887,0.000004644156,0.000058730624],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.99272245,0.0029671942,0.0020364318,0.0006301638,0.0014428308,0.00020090792],"domain_scores_gemma":[0.9479191,0.042106774,0.0049947435,0.00071395247,0.0038207164,0.00044482606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012352657,0.0010072835,0.0039882245,0.011217619,0.00065965956,0.0034829807,0.0019430426,0.0016517328,0.0047480175],"category_scores_gemma":[0.040765405,0.0009550879,0.00407392,0.011328448,0.0016878246,0.0033227722,0.0019771822,0.0018472422,0.0007231454],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013200431,0.00003180472,0.0008287209,0.72206277,0.0022096264,0.000076040524,0.00058282865,0.00019996979,0.0002908567,0.002661861,0.0063426,0.26458102],"study_design_scores_gemma":[0.000050156785,0.00010797609,0.002550463,0.8596071,0.010647837,0.0002852825,0.0006386865,0.00009538886,0.00022495503,0.0018909252,0.12385812,0.00004304021],"about_ca_topic_score_codex":0.008272642,"about_ca_topic_score_gemma":0.030739494,"teacher_disagreement_score":0.012352657,"about_ca_system_score_codex":0.0029304286,"about_ca_system_score_gemma":0.017816968,"threshold_uncertainty_score":0.06532788},"labels":[],"label_agreement":null},{"id":"W3042131196","doi":"10.3390/buildings10070121","title":"Fire Safety in Tall Timber Building: A BIM-Based Automated Code-Checking Approach","year":2020,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":72,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"FPInnovations; École de Technologie Supérieure; Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"National Research Council Canada","keywords":"Building information modeling; Context (archaeology); Building code; Fire safety; Code (set theory); Set (abstract data type); Domain (mathematical analysis); Engineering; Field (mathematics); Information model; Architectural engineering; Computer science; Building design; Fire protection; Construction engineering; Software engineering; Civil engineering","score_opus":0.013861484472442849,"score_gpt":0.21588104913060552,"score_spread":0.20201956465816268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042131196","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020335102,0.00008998063,0.9688913,0.00013065526,0.000017292023,0.00027741847,0.0004808583,0.0047287876,0.0050485684],"genre_scores_gemma":[0.17753193,0.0001412504,0.81713945,0.000049931292,0.000008369022,0.00020576465,0.0020262878,0.00052946055,0.0023676266],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9979791,0.00041709945,0.000111240675,0.0002713383,0.0010333364,0.00018785558],"domain_scores_gemma":[0.99761665,0.00073874614,0.00023617037,0.00054564275,0.00076237484,0.000100434074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001951408,0.0010559467,0.0006966561,0.0032981748,0.0010908206,0.0022212225,0.0019725272,0.0008986819,0.004105893],"category_scores_gemma":[0.0054202713,0.0007222559,0.001649403,0.001768201,0.0011496433,0.0017219712,0.002901135,0.0010478557,0.0013165672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022583344,0.00047192996,0.009250816,0.0005730216,0.0001357706,0.0011669534,0.0022154136,0.42107707,0.024823777,0.06529223,0.007860168,0.466907],"study_design_scores_gemma":[0.0000224471,0.000037051035,0.0014949549,0.00007586835,0.000046287874,0.00016064013,0.00038513134,0.96311736,0.009620863,0.012826998,0.012176928,0.000035488658],"about_ca_topic_score_codex":0.044998195,"about_ca_topic_score_gemma":0.054684907,"teacher_disagreement_score":0.044998195,"about_ca_system_score_codex":0.0016980005,"about_ca_system_score_gemma":0.0045180228,"threshold_uncertainty_score":0.08947253},"labels":[],"label_agreement":null},{"id":"W3042358698","doi":"10.1061/(asce)co.1943-7862.0001909","title":"Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance","year":2020,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; St. Joseph’s Healthcare Hamilton; Concordia University; University of New Brunswick; Alberta Energy","funders":"","keywords":"Modular design; Productivity; Value stream mapping; Process (computing); Lean manufacturing; Performance indicator; Manufacturing engineering; Production line; Engineering; Lean construction; Production (economics); Quality (philosophy); Prefabrication; Systems engineering; Computer science; Construction industry; Construction engineering; Civil engineering; Mechanical engineering; Business","score_opus":0.003026643427788348,"score_gpt":0.1731532312349105,"score_spread":0.17012658780712214,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3042358698","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008256442,0.000096941985,0.98579586,0.00016101092,0.000016909475,0.00010996883,0.00004025745,0.00044565802,0.0050769052],"genre_scores_gemma":[0.2534202,0.00029802663,0.743891,0.000051536706,0.000016364038,0.00020591497,0.00022635597,0.000093448005,0.0017971122],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99798954,0.0006899365,0.000119023636,0.00019969659,0.00082259096,0.0001792809],"domain_scores_gemma":[0.99890995,0.00030020686,0.00020682618,0.00012942667,0.0003739838,0.000079577316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034285139,0.0012591957,0.00045673866,0.0026333116,0.00053145067,0.0030015376,0.0014764168,0.00080938404,0.0016899745],"category_scores_gemma":[0.0029166816,0.0003249553,0.0007526087,0.0022620212,0.00090158335,0.0026285683,0.0020384116,0.0010570267,0.00042081263],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009491372,0.00053819205,0.0049559083,0.00046491498,0.000100974146,0.0004741579,0.001407454,0.31716117,0.01668968,0.41245657,0.0022469782,0.24340901],"study_design_scores_gemma":[0.000025828913,0.00023301355,0.0017792418,0.00017499474,0.00007492963,0.0001947707,0.0007208473,0.86230993,0.011689409,0.09715487,0.025600297,0.00004193018],"about_ca_topic_score_codex":0.00331666,"about_ca_topic_score_gemma":0.0033400438,"teacher_disagreement_score":0.0034285139,"about_ca_system_score_codex":0.0017648267,"about_ca_system_score_gemma":0.0033085586,"threshold_uncertainty_score":0.018131971},"labels":[],"label_agreement":null},{"id":"W3044390034","doi":"10.29173/ijic217","title":"Development of Automated Top-Down Construction System for Low-rise Building Structures","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Education, India; Division of Human Resource Development; Indian Institute of Technology Madras; Curtin University of Technology; Department of Science and Technology, Ministry of Science and Technology, India","keywords":"Automation; Construct (python library); Structural system; Frame (networking); Function (biology); Computer science; Engineering; Systems engineering; Mechanical engineering; Civil engineering","score_opus":0.021304602436279317,"score_gpt":0.2601773538175763,"score_spread":0.23887275138129696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044390034","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14531225,0.00019406214,0.8381719,0.00013555655,0.00008793276,0.0005189946,0.0002865063,0.009969838,0.005323054],"genre_scores_gemma":[0.5731455,0.00016169754,0.42005977,0.00007529746,0.000037114256,0.0003084735,0.0006684878,0.000195434,0.0053482186],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99921346,0.000086419794,0.00003301705,0.00012646076,0.00048373823,0.00005693204],"domain_scores_gemma":[0.99917275,0.000105863175,0.000095033516,0.00023491812,0.00034350407,0.00004790627],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004943892,0.00058160943,0.00043699416,0.0005517106,0.0003565346,0.00052916916,0.0010324966,0.0004364409,0.004516438],"category_scores_gemma":[0.0008051946,0.00024824313,0.00038999665,0.00030792152,0.0002884612,0.0007302215,0.0004858301,0.00042212804,0.0017040183],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027096635,0.00029874354,0.0077950316,0.0005190635,0.000050523002,0.0002702529,0.0002920047,0.032161962,0.41282848,0.0032907156,0.005366874,0.5368554],"study_design_scores_gemma":[0.0001993805,0.0032323296,0.037565537,0.00011302813,0.00019863219,0.0013686531,0.0002907262,0.4466151,0.41528744,0.0022025174,0.092748486,0.00017817777],"about_ca_topic_score_codex":0.0013952305,"about_ca_topic_score_gemma":0.0016205619,"teacher_disagreement_score":0.004516438,"about_ca_system_score_codex":0.00036994304,"about_ca_system_score_gemma":0.0010081081,"threshold_uncertainty_score":0.015109062},"labels":[],"label_agreement":null},{"id":"W3044904954","doi":"10.29173/ijic212","title":"Benchmarking and Improving Dimensional Quality on Modular Construction Projects – A Case Study","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Rework; Benchmarking; Modular design; Quality (philosophy); Benchmark (surveying); Quality management; Key (lock); Construction management; Engineering; Systems engineering; Process management; Computer science; Construction engineering; Operations management; Business; Civil engineering; Management system","score_opus":0.045777543687967735,"score_gpt":0.28270067444928976,"score_spread":0.23692313076132201,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044904954","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98583776,0.00007013224,0.009105116,0.00007421492,0.000006310572,0.00019348369,0.000102604,0.000056516892,0.0045537115],"genre_scores_gemma":[0.9864711,0.00007967123,0.012523441,0.000008211419,0.0000042577453,0.00008038222,0.00008711704,0.000018664017,0.00072714605],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99267197,0.0031505958,0.00031831785,0.0005566547,0.002586067,0.00071631634],"domain_scores_gemma":[0.98920035,0.0042166486,0.0016015708,0.0017209437,0.002673793,0.0005866647],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00788801,0.0006615852,0.0006370771,0.0023914021,0.0014491306,0.0016278838,0.0015317322,0.0013513789,0.0012187057],"category_scores_gemma":[0.013671141,0.00031307753,0.0005644183,0.004162669,0.0015842875,0.0010594426,0.0023902727,0.00081674586,0.00021076466],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013085103,0.0036646165,0.17231068,0.0009514752,0.00016238971,0.008361036,0.017782044,0.35394207,0.023539137,0.017783854,0.003162357,0.39703184],"study_design_scores_gemma":[0.00018419593,0.010402908,0.50562626,0.00053863187,0.00019801293,0.0033187203,0.035884213,0.35247537,0.055575397,0.011343981,0.024101121,0.0003511432],"about_ca_topic_score_codex":0.0069232425,"about_ca_topic_score_gemma":0.011611741,"teacher_disagreement_score":0.00788801,"about_ca_system_score_codex":0.0030474537,"about_ca_system_score_gemma":0.0018632421,"threshold_uncertainty_score":0.041716278},"labels":[],"label_agreement":null},{"id":"W3044979530","doi":"10.29173/ijic208","title":"Towards Dynamic Vertical Urbanism","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Urbanism; Horizontal and vertical; Landmark; Function (biology); Process (computing); Computer science; Roof; Obstacle; Civil engineering; Architecture; Engineering; Geography; Artificial intelligence","score_opus":0.01942932704328958,"score_gpt":0.24728784148406566,"score_spread":0.22785851444077607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3044979530","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.060892243,0.0019703265,0.42155948,0.007838561,0.00049258326,0.00012472343,0.00013248915,0.00045896473,0.5065307],"genre_scores_gemma":[0.86720777,0.0014809088,0.09090701,0.00073401805,0.00012329314,0.0002210614,0.00019289924,0.00019204277,0.03894103],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9988921,0.0004070868,0.000031331627,0.00018073525,0.00028162322,0.00020717012],"domain_scores_gemma":[0.999554,0.0000926035,0.000037579335,0.00012475907,0.00009713272,0.000094040806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001253729,0.00044500607,0.00022650973,0.0008960578,0.001773108,0.0052346657,0.00067906943,0.0010506726,0.0050733415],"category_scores_gemma":[0.0010579026,0.00026159454,0.00044297287,0.0008165875,0.007301292,0.0048441566,0.0072089895,0.0015888694,0.0008929018],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000049546807,0.0000047876442,0.00018647224,0.000021301536,0.0000017072681,0.000026265534,0.0007664309,0.0007287387,0.00026581876,0.98980206,0.001009868,0.007181485],"study_design_scores_gemma":[0.000011002626,0.000030108164,0.00068214,0.00007834318,0.0000073314473,0.00016290466,0.003215655,0.0066677425,0.00080877217,0.6768862,0.31143412,0.00001568948],"about_ca_topic_score_codex":0.0022892938,"about_ca_topic_score_gemma":0.0033055076,"teacher_disagreement_score":0.0052346657,"about_ca_system_score_codex":0.0025617164,"about_ca_system_score_gemma":0.0018803853,"threshold_uncertainty_score":0.018586636},"labels":[],"label_agreement":null},{"id":"W3045107745","doi":"10.1016/j.buildenv.2020.107099","title":"A review of ontologies within the domain of smart and ongoing commissioning","year":2020,"lang":"en","type":"review","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Bio-oriented Technology Research Advancement Institution; Natural Sciences and Engineering Research Council of Canada","keywords":"Ontology; Computer science; Identification (biology); Key (lock); Domain (mathematical analysis); Project commissioning; Data science; Readability; Information retrieval; Publishing","score_opus":0.02015607492006178,"score_gpt":0.24118066167259913,"score_spread":0.22102458675253736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3045107745","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011040661,0.9965765,0.0005009191,0.0006894447,0.00025951062,0.0000096693275,0.000058577876,0.000008166779,0.0017868336],"genre_scores_gemma":[0.00074611156,0.99744993,0.000771289,0.00046259043,0.0001214236,0.000011687928,0.00008250991,0.0000037143573,0.00035065424],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99858546,0.0003607981,0.0003214233,0.00017843042,0.00047047203,0.000083440966],"domain_scores_gemma":[0.9956092,0.002733628,0.0005175583,0.00012753504,0.0008994188,0.00011267041],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032715672,0.0011090782,0.0017755472,0.008409399,0.00050676946,0.0024726314,0.0013120451,0.0018166663,0.003384116],"category_scores_gemma":[0.0063093104,0.0005586657,0.00085197587,0.011592051,0.0012649598,0.0044870935,0.0015484211,0.0017767432,0.0012695851],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045274428,0.000051865027,0.00021287914,0.048409905,0.00012903684,0.0001276098,0.00025648435,0.00038564933,0.00075975334,0.021735217,0.038661785,0.8892245],"study_design_scores_gemma":[0.000007042546,0.000027897593,0.00057217473,0.022728685,0.0001617052,0.00031923022,0.00013847442,0.00006827044,0.00022597471,0.0035879514,0.97214544,0.000017166878],"about_ca_topic_score_codex":0.005112061,"about_ca_topic_score_gemma":0.010131559,"teacher_disagreement_score":0.008409399,"about_ca_system_score_codex":0.0018751543,"about_ca_system_score_gemma":0.0070599373,"threshold_uncertainty_score":0.017301917},"labels":[],"label_agreement":null},{"id":"W3047400308","doi":"10.46421/2706-6568.37.2020.paper002","title":"Automatic Generation of Architectural Layouts using Genetic Algorithms in BIM","year":2020,"lang":"en","type":"article","venue":"CIB W78 conference series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Genetic algorithm; Engineering drawing; Algorithm; Engineering; Machine learning","score_opus":0.04684001078597686,"score_gpt":0.23161949747871965,"score_spread":0.1847794866927428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047400308","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06266503,0.0002155817,0.92563206,0.00021000113,0.000079688594,0.00020419997,0.00024392942,0.0044393395,0.006310179],"genre_scores_gemma":[0.31474948,0.00015728174,0.6812708,0.000095220414,0.000019629802,0.0002387102,0.0006932154,0.00048903696,0.0022866242],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995448,0.00013872539,0.000019710977,0.00010529904,0.00013741,0.000054055923],"domain_scores_gemma":[0.9993698,0.00031358947,0.000040739134,0.00008234509,0.00015918197,0.00003433293],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009822376,0.0009201119,0.0010220862,0.0017061051,0.000767522,0.0012961298,0.0013256625,0.0012263685,0.003435757],"category_scores_gemma":[0.0024606637,0.0008426801,0.0011818227,0.0014472998,0.00080240925,0.00076562155,0.0011125501,0.0009259657,0.0011480838],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008285083,0.0001118396,0.0010631011,0.00008052901,0.00004513883,0.000113475326,0.00016986532,0.80996233,0.0060886308,0.005963934,0.0020955424,0.17422275],"study_design_scores_gemma":[0.000018825585,0.000027850978,0.00021311983,0.0000124660655,0.000014206598,0.000021646532,0.00004139664,0.99322456,0.002104056,0.003249579,0.0010637501,0.00000865586],"about_ca_topic_score_codex":0.011273289,"about_ca_topic_score_gemma":0.0130158765,"teacher_disagreement_score":0.011273289,"about_ca_system_score_codex":0.0010572599,"about_ca_system_score_gemma":0.0014809769,"threshold_uncertainty_score":0.02241534},"labels":[],"label_agreement":null},{"id":"W3047783999","doi":"10.1061/9780784483190.003","title":"Risk-Based and Condition-Based Assessment Framework for Large Diameter Sewers","year":2020,"lang":"en","type":"article","venue":"Pipelines 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Sanitary sewer; Computer science; Environmental science; Reliability engineering; Engineering; Environmental engineering","score_opus":0.010959506694653183,"score_gpt":0.2587086627762036,"score_spread":0.2477491560815504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3047783999","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0038821786,0.00019784017,0.99158365,0.00027177666,0.000014567057,0.00020215784,0.000076441596,0.00011157947,0.0036598328],"genre_scores_gemma":[0.35292235,0.00068657106,0.64075565,0.00009124123,0.0000731592,0.0009403333,0.0002620183,0.00006333146,0.0042053387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9955355,0.0016352707,0.00032819298,0.0006084445,0.0016305895,0.0002619931],"domain_scores_gemma":[0.9970003,0.0010839149,0.00050283736,0.00014612374,0.0010602141,0.00020665751],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00707025,0.00183459,0.000981675,0.004217276,0.0008784914,0.0043776473,0.003565415,0.0019283318,0.003056843],"category_scores_gemma":[0.0067011747,0.00077840895,0.0015677193,0.0015594683,0.0026838148,0.0035497656,0.0032100056,0.0016339335,0.00051343575],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020629675,0.000087649074,0.0014695526,0.00016753002,0.00006736946,0.00039231707,0.00055394234,0.76034456,0.002207996,0.20521441,0.00085476204,0.028619274],"study_design_scores_gemma":[0.0000100141315,0.000063895364,0.00057231507,0.00008415332,0.000033883443,0.000110408764,0.0002405077,0.92222726,0.00052687444,0.07214961,0.003938372,0.00004258984],"about_ca_topic_score_codex":0.013178522,"about_ca_topic_score_gemma":0.009938891,"teacher_disagreement_score":0.013178522,"about_ca_system_score_codex":0.0041733347,"about_ca_system_score_gemma":0.0055848095,"threshold_uncertainty_score":0.037391484},"labels":[],"label_agreement":null},{"id":"W3048897867","doi":"10.3311/ccc2020-030","title":"Implementation of the Common Vulnerability Scoring System to Assess the Cyber Vulnerability in Construction Projects","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"York University; New York University Abu Dhabi","keywords":"Vulnerability (computing); Vulnerability assessment; Computer science; Computer security; Digitization; Process (computing); Risk analysis (engineering); Vulnerability management; Confidentiality; Construction industry; Engineering; Construction engineering; Business; Telecommunications","score_opus":0.03637205381733042,"score_gpt":0.2850880011760495,"score_spread":0.24871594735871907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3048897867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45489794,0.00033371095,0.4870962,0.0006796639,0.00023658111,0.005483752,0.0028246706,0.0026435568,0.04580387],"genre_scores_gemma":[0.5702067,0.00019579835,0.421825,0.00005499759,0.000022028436,0.0023281318,0.0017261561,0.000111936766,0.0035292322],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9797912,0.00626046,0.0034683363,0.0013001201,0.008294264,0.0008855926],"domain_scores_gemma":[0.9613902,0.0076109897,0.0056970636,0.0031731378,0.021040821,0.0010877677],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017205302,0.0013336565,0.0009845837,0.016507603,0.0018736395,0.0036710629,0.0015077579,0.000953727,0.0026649346],"category_scores_gemma":[0.033889364,0.00042381263,0.0010840307,0.008849491,0.001324058,0.0035542296,0.004259254,0.0011552343,0.00087622216],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043101923,0.0006790611,0.3036169,0.0010129538,0.00035543682,0.0004443668,0.0065713753,0.02714481,0.01580117,0.026821055,0.009153405,0.60796833],"study_design_scores_gemma":[0.00017679694,0.003944924,0.52456677,0.0013249241,0.00054073706,0.001621547,0.02139529,0.2962767,0.04668418,0.040093772,0.062336776,0.0010377059],"about_ca_topic_score_codex":0.007263555,"about_ca_topic_score_gemma":0.013469043,"teacher_disagreement_score":0.017205302,"about_ca_system_score_codex":0.0033364408,"about_ca_system_score_gemma":0.0059948517,"threshold_uncertainty_score":0.09099138},"labels":[],"label_agreement":null},{"id":"W3081146706","doi":"10.29173/ijic220","title":"Feasibility and Implications of the Modular Construction Approach for Rapid Post-Disaster Recovery","year":2020,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Demolition; Prefabrication; Process (computing); Engineering; Population; Government (linguistics); Disaster recovery; Emergency management; Architectural engineering; Construction engineering; Civil engineering; Risk analysis (engineering); Environmental planning; Forensic engineering; Business; Computer science; Political science; Geography","score_opus":0.039385484879517735,"score_gpt":0.24985082266287503,"score_spread":0.2104653377833573,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3081146706","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63864434,0.009183164,0.19432823,0.008393367,0.0006274688,0.002187851,0.00034802943,0.00049960526,0.14578791],"genre_scores_gemma":[0.8398061,0.004631661,0.1461901,0.00035544822,0.000067524066,0.0005415117,0.00014608809,0.00004916741,0.008212423],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99824107,0.0008521353,0.000068626745,0.000104656654,0.0005794895,0.00015389828],"domain_scores_gemma":[0.9980849,0.00071595516,0.000249326,0.0002001105,0.0006228453,0.00012681728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003089106,0.0004850832,0.00016973946,0.0011625389,0.0007583498,0.0010138337,0.0012071242,0.0008814382,0.0057771537],"category_scores_gemma":[0.0061203646,0.00020836292,0.00052993564,0.0007969539,0.0006801951,0.001348054,0.0012804321,0.0004982803,0.0010368105],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046794672,0.00093159155,0.012894193,0.0027850883,0.000059745056,0.0021942684,0.0029192516,0.011528,0.019950707,0.022950336,0.006422448,0.9168964],"study_design_scores_gemma":[0.0006511762,0.01331782,0.17058013,0.0076367385,0.0007652584,0.009812052,0.040816233,0.08005831,0.06085416,0.077691525,0.53739166,0.00042486508],"about_ca_topic_score_codex":0.0012145767,"about_ca_topic_score_gemma":0.0040940535,"teacher_disagreement_score":0.0057771537,"about_ca_system_score_codex":0.000715956,"about_ca_system_score_gemma":0.001889741,"threshold_uncertainty_score":0.019326508},"labels":[],"label_agreement":null},{"id":"W3082354722","doi":"10.1016/j.autcon.2020.103368","title":"Rule-based compliance checking and generative design for building interiors using BIM","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":110,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta; Athabasca University","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates - Technology Futures; CRDF Global","keywords":"Building information modeling; Generative Design; Computer science; Process (computing); Building design; Design language; Set (abstract data type); Modeling language; Representation (politics); Software engineering; Engineering design process; Design process; Systems engineering; Human–computer interaction; Engineering; Programming language; Architectural engineering; Software; Work in process","score_opus":0.06662640949856635,"score_gpt":0.2762750582442213,"score_spread":0.20964864874565498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3082354722","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010102472,0.000026979593,0.98646253,0.00003374666,0.000012503354,0.00006660005,0.00004629028,0.0016955389,0.0015533114],"genre_scores_gemma":[0.35397205,0.000062918116,0.64347136,0.000061985564,0.000008941968,0.00014717043,0.00033934353,0.0005504119,0.0013858518],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9944252,0.0018457783,0.00038033217,0.00071059575,0.0022901667,0.00034802628],"domain_scores_gemma":[0.9925476,0.0034847509,0.00044191093,0.0022850328,0.0011263388,0.000114471826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004896069,0.0008941473,0.0013978054,0.0015376236,0.0010768053,0.0033842027,0.0029695553,0.0015591356,0.003785995],"category_scores_gemma":[0.013422723,0.0013113748,0.0026734828,0.0010471187,0.00339673,0.0024962728,0.0037383174,0.0017950167,0.00086483604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000352433,0.0002800856,0.0026948533,0.00030101027,0.00015066059,0.00042466665,0.0009461805,0.66095394,0.0156214,0.12043665,0.0017332605,0.19610482],"study_design_scores_gemma":[0.000028797442,0.000034786368,0.0001794337,0.00003615275,0.000035591645,0.00006059871,0.00005423575,0.95234215,0.008884722,0.036561485,0.0017617925,0.000020216441],"about_ca_topic_score_codex":0.0044385414,"about_ca_topic_score_gemma":0.0062949318,"teacher_disagreement_score":0.004896069,"about_ca_system_score_codex":0.0007923511,"about_ca_system_score_gemma":0.0021461658,"threshold_uncertainty_score":0.025893211},"labels":[],"label_agreement":null},{"id":"W3083247486","doi":"10.35784/bud-arch.2160","title":"Time-Cost Relationship for Predicting Construction Duration","year":2013,"lang":"en","type":"article","venue":"Budownictwo i Architektura","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomechanica (Canada)","funders":"","keywords":"Duration (music); Function (biology); Construction management; Construction engineering; Computer science; Pre-construction services; Operations research; Project management; Engineering; Operations management; Transport engineering; Risk analysis (engineering); Civil engineering; Project planning; Business; Systems engineering","score_opus":0.010152214787963583,"score_gpt":0.20461385570411528,"score_spread":0.1944616409161517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3083247486","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7706097,0.0011140777,0.2189358,0.00027034563,0.000074365154,0.00007940468,0.0027378737,0.00067285687,0.005505589],"genre_scores_gemma":[0.9822525,0.0003407617,0.014410566,0.000011596923,0.000018138175,0.00005296711,0.0011250377,0.00006197587,0.0017263867],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991248,0.00026961963,0.000071140086,0.00017754271,0.00024653878,0.000110380475],"domain_scores_gemma":[0.9927631,0.0050420486,0.0008910988,0.0004391688,0.0006450905,0.0002194251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016443375,0.00072427443,0.00040402327,0.0029021574,0.00020647877,0.00085859175,0.00075783115,0.0010304208,0.004177274],"category_scores_gemma":[0.010860198,0.00030751957,0.0006828617,0.0021062403,0.00028399355,0.0014921053,0.00047472076,0.00053083984,0.0012527597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035035532,0.00015926205,0.14352418,0.00013390122,0.000095268646,0.00015461372,0.00011908104,0.79876524,0.002797854,0.0044508395,0.000993602,0.04845579],"study_design_scores_gemma":[0.000008249691,0.0001516149,0.034223057,0.000023362592,0.000038493356,0.00017642083,0.0000603411,0.9612037,0.0010856215,0.0017807384,0.0012161,0.000032286407],"about_ca_topic_score_codex":0.009192287,"about_ca_topic_score_gemma":0.0060851825,"teacher_disagreement_score":0.009192287,"about_ca_system_score_codex":0.00060346775,"about_ca_system_score_gemma":0.00045469482,"threshold_uncertainty_score":0.018277586},"labels":[],"label_agreement":null},{"id":"W3083778987","doi":"10.36680/j.itcon.2020.024","title":"Construction 4.0: a survey of research trends","year":2020,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":83,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Digitization; Structuring; Construction industry; Quality (philosophy); Engineering; Emerging technologies; Industry 4.0; Construction management; Construction engineering; Business; Engineering management; Computer science; Civil engineering; Telecommunications","score_opus":0.025717033543118405,"score_gpt":0.27746792897006844,"score_spread":0.25175089542695006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3083778987","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0074694715,0.97182083,0.0015941429,0.0037259876,0.00040074627,0.00004334239,0.00046865837,0.00006988475,0.014407019],"genre_scores_gemma":[0.02034208,0.97280246,0.0034041693,0.0009729136,0.00033788764,0.00005139544,0.0006787023,0.000043053133,0.001367359],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9953738,0.00094044855,0.0008461732,0.0008163682,0.0017417772,0.00028154056],"domain_scores_gemma":[0.9643468,0.024510397,0.0030759575,0.000681486,0.006663387,0.0007220105],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.008504594,0.0007758267,0.0009422609,0.03204299,0.0011167742,0.004814187,0.0014646944,0.00202875,0.0046414933],"category_scores_gemma":[0.012814094,0.0008816398,0.0013978026,0.047093537,0.0016571545,0.007876826,0.0015069563,0.001616987,0.001743557],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001123236,0.00011742104,0.010849848,0.040210176,0.00015631874,0.00033496242,0.0030825625,0.000809196,0.0017097816,0.026415091,0.02886857,0.8873337],"study_design_scores_gemma":[0.000009903687,0.00013351045,0.022893295,0.037260424,0.00022866367,0.0010537148,0.005715693,0.000508222,0.0010995531,0.0054975115,0.92552346,0.00007614337],"about_ca_topic_score_codex":0.0066534835,"about_ca_topic_score_gemma":0.007617388,"teacher_disagreement_score":0.967957,"about_ca_system_score_codex":0.0036474804,"about_ca_system_score_gemma":0.007938125,"threshold_uncertainty_score":0.04497713},"labels":[],"label_agreement":null},{"id":"W3084234387","doi":"10.1139/cjce-2019-0825","title":"4D-based automation of heavy lift planning in industrial construction projects","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; PCL Construction (Canada); University of New Brunswick; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Lift (data mining); Engineering; Lifting equipment; Process (computing); Automation; Visualization; Transport engineering; Computer science; Construction engineering","score_opus":0.019825054788540273,"score_gpt":0.1897154481543923,"score_spread":0.16989039336585204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3084234387","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.120479956,0.00016613709,0.79039824,0.00017996319,0.000052906806,0.00039787308,0.0034383757,0.07570995,0.009176644],"genre_scores_gemma":[0.5394081,0.00022913876,0.45223078,0.00007262745,0.000012716444,0.00030935518,0.002592243,0.0014565343,0.003688479],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994394,0.00010165344,0.000032808985,0.00012023962,0.0002477801,0.000058042144],"domain_scores_gemma":[0.9992501,0.00022789036,0.000093609706,0.00016705904,0.00018679505,0.000074469426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064334465,0.0008381404,0.0007506855,0.0015285886,0.0004557777,0.0010464261,0.0009932687,0.0004865171,0.007676517],"category_scores_gemma":[0.0013242308,0.00075736584,0.00046298432,0.0010054158,0.0003531476,0.0005236187,0.0017209706,0.00041817894,0.0022774627],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008943928,0.00037454296,0.017023081,0.0007427633,0.00009392434,0.00080083066,0.0024647932,0.16911617,0.09338891,0.002545634,0.01696653,0.6955884],"study_design_scores_gemma":[0.00008438671,0.000121380064,0.017930048,0.000100380516,0.0000311153,0.00027080573,0.0005434759,0.9096083,0.046000637,0.0024070197,0.0227912,0.00011114713],"about_ca_topic_score_codex":0.012323488,"about_ca_topic_score_gemma":0.020342465,"teacher_disagreement_score":0.012323488,"about_ca_system_score_codex":0.00055652315,"about_ca_system_score_gemma":0.0010698482,"threshold_uncertainty_score":0.025680482},"labels":[],"label_agreement":null},{"id":"W3086115252","doi":"10.19083/tesis/625159","title":"Optimización del planeamiento y control de un proyecto inmobiliario, a través de LPS y un modelo BIM para el secuenciamiento e identificación de restricciones","year":2018,"lang":"es","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"College of Physicians and Surgeons of Ontario","funders":"","keywords":"Humanities; Philosophy; Political science","score_opus":0.008611485110410932,"score_gpt":0.24533355190955983,"score_spread":0.2367220667991489,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086115252","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033763174,0.0004952971,0.9575909,0.00017238292,0.00004627533,0.000063033134,0.000053172243,0.000446423,0.007369303],"genre_scores_gemma":[0.6558082,0.0018488253,0.33258417,0.000060758335,0.000042619336,0.00027985012,0.00020157608,0.00021896303,0.008955004],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994005,0.00016167195,0.00002397728,0.0001265035,0.00021596045,0.0000714088],"domain_scores_gemma":[0.99955195,0.00016053853,0.000083534076,0.00005703775,0.00011369737,0.00003327484],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013404321,0.0012975945,0.000731904,0.0007354666,0.00042012162,0.002417152,0.0005939835,0.0007442119,0.002065596],"category_scores_gemma":[0.0017077187,0.00047553916,0.00054813037,0.00070855435,0.0007396089,0.0013032655,0.0011837938,0.00085311197,0.0006033447],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021583033,0.00014633297,0.0011935219,0.0002434081,0.000027308122,0.00012305207,0.00034627732,0.8212907,0.021743363,0.022772685,0.0009405049,0.13095708],"study_design_scores_gemma":[0.000029623561,0.0001934728,0.0009384727,0.000053855554,0.000040806393,0.00004836336,0.00017785821,0.9634509,0.014221332,0.010813984,0.010006654,0.00002473801],"about_ca_topic_score_codex":0.0035674446,"about_ca_topic_score_gemma":0.002749716,"teacher_disagreement_score":0.0035674446,"about_ca_system_score_codex":0.001001961,"about_ca_system_score_gemma":0.0019774062,"threshold_uncertainty_score":0.00726974},"labels":[],"label_agreement":null},{"id":"W3086133385","doi":"10.1111/mice.12619","title":"A tribute to 35 years of high-impact research and outstanding leadership","year":2020,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Tribute; Citation; Library science; Sociology; Political science; Law; Computer science","score_opus":0.03579524849168424,"score_gpt":0.24244965778109756,"score_spread":0.2066544092894133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3086133385","genre_codex":"commentary","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00084843155,0.0072750263,0.001789891,0.7274261,0.23944218,0.0000848205,0.00011775487,0.00026088685,0.02275494],"genre_scores_gemma":[0.02301654,0.0050940127,0.003011593,0.63911337,0.079907104,0.0002553227,0.00028112135,0.0006574969,0.24866344],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.94713604,0.00880948,0.0024763294,0.004463746,0.026856305,0.010258171],"domain_scores_gemma":[0.81844395,0.012462366,0.0039097057,0.008959243,0.06929225,0.0869325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.037268072,0.002341014,0.0037298168,0.0037966515,0.015905555,0.0277601,0.0039615026,0.015145921,0.03452416],"category_scores_gemma":[0.106837526,0.0010109041,0.0020817977,0.002251346,0.015629139,0.010492413,0.019531066,0.04483718,0.03288684],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060125283,0.00008350395,0.00035055887,0.000045069646,0.000031203323,0.00010963372,0.00027870483,0.00006125545,0.0001617322,0.017161192,0.96976197,0.011895024],"study_design_scores_gemma":[0.000057475238,0.00006536174,0.0006514612,0.00028092938,0.000010688089,0.00015640174,0.0006928554,0.00015294022,0.00008720141,0.015144962,0.9826486,0.00005110686],"about_ca_topic_score_codex":0.0065608886,"about_ca_topic_score_gemma":0.012894058,"teacher_disagreement_score":0.037268072,"about_ca_system_score_codex":0.008534722,"about_ca_system_score_gemma":0.04016454,"threshold_uncertainty_score":0.19709474},"labels":[],"label_agreement":null},{"id":"W3087452701","doi":"10.11575/prism/38188","title":"Learning design with data: towards a pedagogical framework for the use of Building Information Modeling technology as support for design in architecture curricula","year":2020,"lang":"en","type":"dissertation","venue":"Open MIND","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Calgary","keywords":"Architecture; Curriculum; Learning design; Computer science; Engineering management; Engineering; Systems engineering; Knowledge management; Data science; Software engineering; Mathematics education; Pedagogy; Sociology; Psychology; Geography","score_opus":0.15706509092723672,"score_gpt":0.3577731028936449,"score_spread":0.20070801196640817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3087452701","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0097249225,0.0036531046,0.87329966,0.04124186,0.00039673023,0.0006540645,0.00013971239,0.00053667667,0.070353314],"genre_scores_gemma":[0.21580227,0.003040692,0.76759577,0.0026347416,0.00021575888,0.0017453168,0.00021930126,0.00020879543,0.008537389],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97509664,0.019345451,0.0011149219,0.0015588835,0.0020717806,0.0008122612],"domain_scores_gemma":[0.9762515,0.017520484,0.0010075459,0.0020705226,0.0013188872,0.0018309365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.034505147,0.0013477183,0.0010541355,0.008043077,0.0058218697,0.022104487,0.0073650302,0.0069045345,0.003293288],"category_scores_gemma":[0.018497268,0.0013148517,0.0012598058,0.005034983,0.04726036,0.019160686,0.014463824,0.009316005,0.001025954],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013906026,0.00011025217,0.0006633287,0.00020695599,0.000008420102,0.00015610138,0.02887104,0.0013960787,0.00030375423,0.9343678,0.001866377,0.032036033],"study_design_scores_gemma":[0.000039709383,0.00007852065,0.00047001746,0.0010943658,0.000018324652,0.00023921161,0.019548526,0.009803263,0.0007902108,0.7410135,0.2268475,0.000056748588],"about_ca_topic_score_codex":0.00950098,"about_ca_topic_score_gemma":0.010720836,"teacher_disagreement_score":0.034505147,"about_ca_system_score_codex":0.011286744,"about_ca_system_score_gemma":0.016817335,"threshold_uncertainty_score":0.18248284},"labels":[],"label_agreement":null},{"id":"W3088815354","doi":"10.1108/jedt-04-2020-0146","title":"Critical success factors for adopting building information modelling (BIM) and lean construction practices on construction mega-projects: a Delphi survey","year":2020,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":63,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Building information modeling; Delphi method; Lean construction; Critical success factor; Questionnaire; Mega-; Engineering; Knowledge management; Construction management; Originality; Delphi; Project management; Construction industry; Engineering management; Integrated project delivery; Business; Process management; Construction engineering; Operations management; Systems engineering; Qualitative research; Civil engineering; Computer science","score_opus":0.04584129129515402,"score_gpt":0.2558299264686255,"score_spread":0.2099886351734715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088815354","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9937966,0.00012874203,0.0021608442,0.0004277195,0.00001293408,0.000845966,0.00013656323,0.000013357384,0.0024773339],"genre_scores_gemma":[0.9923408,0.00049191935,0.0039140424,0.00024137173,0.000007964337,0.0019674774,0.00012644858,0.000008895593,0.0009010182],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.98531264,0.007752932,0.001274889,0.00065503485,0.0026189291,0.0023855797],"domain_scores_gemma":[0.9674771,0.019019373,0.0025368691,0.00074911845,0.00833417,0.0018834029],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02331907,0.00055085204,0.0005063897,0.003572893,0.002478836,0.0021064628,0.00066726364,0.0011095448,0.0028008579],"category_scores_gemma":[0.03974016,0.0007718219,0.00065651577,0.0016628965,0.0015817938,0.002263271,0.004322986,0.0012476423,0.00059445814],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046827432,0.00055974966,0.24569006,0.0020821553,0.0000761079,0.0017038748,0.6109509,0.0012064837,0.008642137,0.0025482844,0.0032589792,0.12281299],"study_design_scores_gemma":[0.000029625473,0.0014118671,0.13717477,0.0011386025,0.000042596203,0.0009838163,0.8363302,0.002262003,0.003070528,0.001250221,0.016159862,0.00014592295],"about_ca_topic_score_codex":0.002585938,"about_ca_topic_score_gemma":0.0023263576,"teacher_disagreement_score":0.02331907,"about_ca_system_score_codex":0.0032239,"about_ca_system_score_gemma":0.004607429,"threshold_uncertainty_score":0.123324454},"labels":[],"label_agreement":null},{"id":"W3088827038","doi":"10.1080/15623599.2020.1819583","title":"Scheduling tools for the construction industry: overview and decision support system for tool selection","year":2020,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Lagging; Automation; Process management; Computer science; Productivity; Schedule; Process (computing); Enterprise resource planning; Identification (biology); Engineering management; Operations management; Engineering","score_opus":0.02677347746712758,"score_gpt":0.2663400199148266,"score_spread":0.239566542447699,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3088827038","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05103627,0.034052078,0.8463929,0.0028697464,0.00044913913,0.005412591,0.011305161,0.029890321,0.018591736],"genre_scores_gemma":[0.1136702,0.0159348,0.8576212,0.0002801514,0.00016063964,0.0023848142,0.006084406,0.00029945065,0.0035643727],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970585,0.00077580847,0.0007578029,0.00035468294,0.0009328049,0.00012043415],"domain_scores_gemma":[0.9944364,0.0031825614,0.00069306645,0.0002776058,0.0011968389,0.0002135317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005501951,0.0014395529,0.0013562255,0.0088904435,0.0009795635,0.003780295,0.0015719922,0.0014022592,0.005855854],"category_scores_gemma":[0.009185102,0.0009264356,0.0016231701,0.006766437,0.00033908384,0.0028032507,0.0013682859,0.0008402238,0.0025028072],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00076176575,0.0003791012,0.0071240114,0.0071473387,0.0002288453,0.00071226823,0.001165042,0.011865479,0.011721103,0.004277439,0.017195674,0.937422],"study_design_scores_gemma":[0.0009613957,0.0016801957,0.037555903,0.011528202,0.0018311541,0.003624821,0.0044236644,0.35948655,0.056099698,0.023519007,0.4984149,0.00087447505],"about_ca_topic_score_codex":0.003213616,"about_ca_topic_score_gemma":0.004944855,"teacher_disagreement_score":0.0088904435,"about_ca_system_score_codex":0.0011261833,"about_ca_system_score_gemma":0.0030496132,"threshold_uncertainty_score":0.029097497},"labels":[],"label_agreement":null},{"id":"W3090386987","doi":"10.1109/aparm49247.2020.9209516","title":"Simulation-based approach for risk assessment in onshore wind farm construction projects","year":2020,"lang":"en","type":"article","venue":"2020 Asia-Pacific International Symposium on Advanced Reliability and Maintenance Modeling (APARM)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Wind power; Risk assessment; Renewable energy; Risk analysis (engineering); Critical path method; Cost estimate; Computer science; Engineering; Operations research; Systems engineering; Business","score_opus":0.012467528594616646,"score_gpt":0.2426844412363086,"score_spread":0.23021691264169197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3090386987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10434291,0.00033830243,0.8802218,0.00026730474,0.000036072102,0.00018985463,0.0002458922,0.0005639323,0.01379396],"genre_scores_gemma":[0.87230814,0.0005450158,0.12139178,0.00005425982,0.000020379786,0.00040179046,0.00026541008,0.00010384175,0.0049094125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99940646,0.00032610307,0.000029429826,0.000053422835,0.00012459014,0.000059988826],"domain_scores_gemma":[0.9991303,0.0005618486,0.00008014137,0.00003192224,0.00014878748,0.000046979298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010160664,0.00078883325,0.0007601221,0.0012396933,0.00069634645,0.0013092059,0.0009760197,0.0012662502,0.0024452785],"category_scores_gemma":[0.0019409521,0.0005912678,0.0009763323,0.0008936363,0.0005103851,0.0007486488,0.00087949395,0.00074030383,0.00022878287],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000085659885,0.000008930277,0.00027713348,0.000005634839,0.0000070481587,0.000020821417,0.000016040609,0.9960912,0.00013325941,0.0018373077,0.000052040315,0.001542083],"study_design_scores_gemma":[0.0000020830526,0.000005380843,0.000062642655,0.0000028968739,0.0000030467913,0.0000054626407,0.000008917792,0.9989023,0.000067953166,0.0007457753,0.00019123917,0.0000022679217],"about_ca_topic_score_codex":0.021776443,"about_ca_topic_score_gemma":0.013428968,"teacher_disagreement_score":0.021776443,"about_ca_system_score_codex":0.001364672,"about_ca_system_score_gemma":0.0018768,"threshold_uncertainty_score":0.043299377},"labels":[],"label_agreement":null},{"id":"W3092708273","doi":"10.3390/su12208665","title":"Remote Teaching of Building Information Modeling During the COVID-19 Pandemic: A Case Study","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Work (physics); Computer science; CLIPS; Coronavirus disease 2019 (COVID-19); Distance education; Pandemic; Software; Knowledge management; Multimedia; Engineering; Mathematics education; Psychology; Artificial intelligence","score_opus":0.022315739933321546,"score_gpt":0.2848206841298385,"score_spread":0.262504944196517,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3092708273","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98902553,0.00018313206,0.0025656424,0.0011212392,0.000046340276,0.00019163615,0.000053276577,0.000029704366,0.0067834356],"genre_scores_gemma":[0.98760986,0.0004959007,0.0037708527,0.0003302368,0.000045062556,0.0001044339,0.00006272022,0.00003382276,0.0075471015],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99769044,0.0011732898,0.000061882456,0.00018776757,0.00027179634,0.00061491976],"domain_scores_gemma":[0.99737835,0.0012103011,0.00016840767,0.0001295824,0.00016157057,0.0009518251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026701945,0.0006329719,0.0005180044,0.00074250967,0.006227138,0.001942599,0.0018913958,0.0038407315,0.0037322396],"category_scores_gemma":[0.004509917,0.00039984533,0.0006341617,0.000646772,0.0027811723,0.0015660655,0.0036498846,0.0027584643,0.0007520882],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005429424,0.01672677,0.035745658,0.0012500107,0.000060957907,0.12219068,0.65967447,0.006513609,0.01174057,0.008859948,0.0076795015,0.12901485],"study_design_scores_gemma":[0.00014391498,0.0052632955,0.029717641,0.0006195863,0.00005252364,0.042328093,0.80364597,0.00682998,0.012996387,0.0025713772,0.09562517,0.0002060241],"about_ca_topic_score_codex":0.0045813993,"about_ca_topic_score_gemma":0.013932488,"teacher_disagreement_score":0.006227138,"about_ca_system_score_codex":0.0020977706,"about_ca_system_score_gemma":0.0020006325,"threshold_uncertainty_score":0.015220463},"labels":[],"label_agreement":null},{"id":"W3094400457","doi":"","title":"Modelo estocástico del aprendizaje de la mano de obra en actividades de colocación de muros en bloques de concreto, en construcción masiva de vivienda en México","year":2004,"lang":"es","type":"article","venue":"Revista ingeniería de construcción","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Humanities; Art","score_opus":0.004529202694280266,"score_gpt":0.24345704647238253,"score_spread":0.23892784377810228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3094400457","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8404277,0.000769611,0.04022956,0.0028369585,0.000067077926,0.00014415482,0.00080853543,0.00024953415,0.11446685],"genre_scores_gemma":[0.98858124,0.00023487431,0.004354877,0.0000184212,0.000004060463,0.00005091585,0.00011071793,0.000015725082,0.0066292416],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995228,0.00015088153,0.000016405478,0.000078907986,0.000099591925,0.00013131725],"domain_scores_gemma":[0.99861264,0.0006147256,0.0002055306,0.00010236977,0.0003631995,0.000101434794],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014509914,0.0004460051,0.00024171005,0.0013619569,0.0011452041,0.003927986,0.00071456004,0.001129124,0.0070627853],"category_scores_gemma":[0.0035305794,0.0003283059,0.00048685903,0.0012900585,0.0013088732,0.0024799611,0.0014149231,0.00072781276,0.00048128323],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014769273,0.00083246926,0.22275072,0.0006578563,0.00017618123,0.0014457887,0.039472483,0.12915467,0.009732371,0.4472709,0.009162681,0.13786691],"study_design_scores_gemma":[0.00019246091,0.00065818673,0.24414122,0.0008846339,0.00077240024,0.0008452498,0.084379695,0.43296775,0.009062043,0.12300731,0.102924,0.00016505842],"about_ca_topic_score_codex":0.073713005,"about_ca_topic_score_gemma":0.07958778,"teacher_disagreement_score":0.073713005,"about_ca_system_score_codex":0.0041952757,"about_ca_system_score_gemma":0.0035507577,"threshold_uncertainty_score":0.14656788},"labels":[],"label_agreement":null},{"id":"W3094862917","doi":"10.1007/978-3-030-61814-8_7","title":"Design and Implementation of a Serious Game to Make Construction Workers Aware of Exposure to Silica Dust in the Workplace","year":2020,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Centre Intégré Universitaire de Santé et de Services Sociaux du Saguenay–Lac-Saint-Jean; Université du Québec à Chicoutimi","funders":"","keywords":"Silicosis; Computer science; Work (physics); Risk analysis (engineering); Business; Medicine; Engineering; Pathology","score_opus":0.010782416865345158,"score_gpt":0.2305440920370108,"score_spread":0.21976167517166564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3094862917","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2626388,0.00017611009,0.7067253,0.00046522846,0.00021551053,0.0037493217,0.00028154714,0.0072485353,0.018499613],"genre_scores_gemma":[0.49660555,0.00013306845,0.48241892,0.00031049416,0.000010437786,0.0025314947,0.00035645807,0.0004089545,0.017224696],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934083,0.0002093231,0.000046385274,0.00013942728,0.00015165753,0.000112435846],"domain_scores_gemma":[0.9990538,0.00043114333,0.000050806015,0.000059057882,0.00020071378,0.00020453143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008693517,0.0013116729,0.0005013174,0.00039332878,0.0005480706,0.0015407864,0.003091421,0.0014701155,0.009048738],"category_scores_gemma":[0.0019123581,0.0006214032,0.00051796396,0.00011778411,0.0005653794,0.0008805085,0.0015347652,0.00072755065,0.0013505489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005146982,0.0143512385,0.015520388,0.0031267172,0.00046262884,0.0028430545,0.012646425,0.078862615,0.347013,0.017006794,0.013753591,0.48926654],"study_design_scores_gemma":[0.0025593073,0.014361388,0.017123332,0.00057238026,0.00087882945,0.0016932783,0.0068692868,0.693934,0.14850499,0.010148771,0.10295098,0.00040344213],"about_ca_topic_score_codex":0.0026319106,"about_ca_topic_score_gemma":0.0026948163,"teacher_disagreement_score":0.009048738,"about_ca_system_score_codex":0.00047865164,"about_ca_system_score_gemma":0.001374974,"threshold_uncertainty_score":0.030270994},"labels":[],"label_agreement":null},{"id":"W3096234675","doi":"10.3390/modelling1020010","title":"Stochastic Earthmoving Fleet Arrangement Optimization Considering Project Duration and Cost","year":2020,"lang":"en","type":"article","venue":"Modelling—International Open Access Journal of Modelling in Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Duration (music); Operations research; Resource (disambiguation); Engineering; Cost estimate; Industrial engineering; Project management; Estimation; Computer science; Systems engineering","score_opus":0.07008758711287291,"score_gpt":0.3040871298391307,"score_spread":0.2339995427262578,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096234675","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6110917,0.0004164301,0.37904868,0.00036037905,0.000032071148,0.00014297798,0.00039704592,0.00018401787,0.008326692],"genre_scores_gemma":[0.9777868,0.00016956459,0.019073525,0.000021750846,0.0000057452744,0.00009392177,0.00017829443,0.000030688472,0.0026397635],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952996,0.00019716145,0.0000163956,0.000081454615,0.000059879916,0.00011502466],"domain_scores_gemma":[0.9989899,0.00060837495,0.00014687487,0.00004063508,0.00010020984,0.00011415296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012824233,0.0009151829,0.0009899216,0.00078975275,0.00041400065,0.0011333714,0.0008548745,0.0010586375,0.0022981896],"category_scores_gemma":[0.0020216617,0.0006780434,0.00094270706,0.0008808765,0.000501041,0.0010564991,0.0007453699,0.0007378475,0.00015993664],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001077895,0.000005689405,0.0001637068,0.0000046145274,0.000003876553,0.000014231512,0.000002859007,0.9986786,0.000081501355,0.00029478862,0.000024563316,0.00071479887],"study_design_scores_gemma":[0.0000029705063,0.000018527284,0.00019521211,0.0000017945797,0.0000039073725,0.0000056872923,0.000009352861,0.99932694,0.00006091356,0.00031784203,0.0000545008,0.0000023786429],"about_ca_topic_score_codex":0.012928045,"about_ca_topic_score_gemma":0.009230378,"teacher_disagreement_score":0.012928045,"about_ca_system_score_codex":0.001457519,"about_ca_system_score_gemma":0.0016430957,"threshold_uncertainty_score":0.025705576},"labels":[],"label_agreement":null},{"id":"W3096288126","doi":"10.1007/978-3-030-60816-3_30","title":"Challenges Related to 4D BIM Simulation in the Construction Industry","year":2020,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Perspective (graphical); Computer science; Construction industry; Knowledge management; Software; Engineering management; Qualitative property; Construction engineering; Engineering; Artificial intelligence","score_opus":0.023101771775548573,"score_gpt":0.2391388738017311,"score_spread":0.21603710202618254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3096288126","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042114537,0.031773876,0.6899355,0.04488365,0.002831349,0.00017491185,0.00094887207,0.0031234757,0.18421386],"genre_scores_gemma":[0.456428,0.04702633,0.42765713,0.0034609989,0.0009716646,0.00038973815,0.0018541105,0.0013104556,0.06090149],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99812955,0.0007337826,0.000055966702,0.00009633517,0.0008827887,0.000101695994],"domain_scores_gemma":[0.99631494,0.0026060315,0.00008320029,0.00028909964,0.0005081135,0.00019860738],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004060903,0.0006794073,0.0013299754,0.0010103601,0.0012179886,0.006686549,0.0031464247,0.0030940499,0.016958302],"category_scores_gemma":[0.005462437,0.0009779461,0.0008822293,0.0017879835,0.002071565,0.0049873735,0.003862767,0.0028126612,0.0035870587],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089714114,0.000105578685,0.0011361098,0.00069475704,0.00005481855,0.00026058932,0.0006501987,0.524394,0.002295397,0.23170018,0.029010119,0.20960863],"study_design_scores_gemma":[0.000016419048,0.00004547665,0.00038405502,0.00046017478,0.000018481005,0.0003158991,0.0008989607,0.6296383,0.0019352965,0.18778546,0.17843898,0.00006245524],"about_ca_topic_score_codex":0.0068454016,"about_ca_topic_score_gemma":0.007838986,"teacher_disagreement_score":0.016958302,"about_ca_system_score_codex":0.0020280695,"about_ca_system_score_gemma":0.0022676976,"threshold_uncertainty_score":0.056731164},"labels":[],"label_agreement":null},{"id":"W3097054013","doi":"10.1155/2020/8834389","title":"Collaboration-Based BIM Model Development Management System for General Contractors in Infrastructure Projects","year":2020,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and Technology, Taiwan","keywords":"Building information modeling; Process (computing); Construction engineering; Construction management; Process management; Engineering management; Systems engineering; Information model; Project management; Facility management; Engineering; Computer science; Software engineering; Operations management; Business; Civil engineering","score_opus":0.007255022294394344,"score_gpt":0.21144659993231932,"score_spread":0.20419157763792498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097054013","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15634911,0.00079679023,0.72703147,0.0012647387,0.00024846467,0.0022693854,0.0054443954,0.07227424,0.034321446],"genre_scores_gemma":[0.6311744,0.00067235867,0.34663236,0.00021210848,0.00008510989,0.00195835,0.009156373,0.0007396027,0.009369404],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9963977,0.0008304366,0.0006229483,0.00085351773,0.001019523,0.00027585818],"domain_scores_gemma":[0.99722916,0.000376102,0.00032412063,0.0005952765,0.0010013158,0.00047402625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004870959,0.001191772,0.0009994493,0.0038153674,0.0019416661,0.0032945434,0.0022245634,0.0011515443,0.006362108],"category_scores_gemma":[0.0057382067,0.0006515715,0.0007568121,0.0029457987,0.000446084,0.0038255574,0.004959908,0.00085448235,0.002761014],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021860222,0.001568641,0.04470921,0.0010812465,0.00024278366,0.0020171104,0.008889822,0.0626028,0.023230048,0.020318318,0.084702805,0.7484511],"study_design_scores_gemma":[0.00041484885,0.00049134344,0.023920866,0.00029153793,0.000312058,0.00094474375,0.0030632378,0.7806833,0.027573105,0.009409138,0.15242834,0.00046751733],"about_ca_topic_score_codex":0.0063397684,"about_ca_topic_score_gemma":0.0049232603,"teacher_disagreement_score":0.006362108,"about_ca_system_score_codex":0.001389902,"about_ca_system_score_gemma":0.004199172,"threshold_uncertainty_score":0.025760412},"labels":[],"label_agreement":null},{"id":"W3097564098","doi":"10.3390/su12219266","title":"Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication","year":2020,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Prefabrication; Scheduling (production processes); Engineering; Simulated annealing; Construction management; Transport engineering; Computer science; Operations research; Operations management; Civil engineering","score_opus":0.005096007846219207,"score_gpt":0.2251658062655857,"score_spread":0.22006979841936647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3097564098","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3518123,0.00022157886,0.63730186,0.00018831894,0.0000521243,0.00013899124,0.000103517115,0.00024234445,0.009938894],"genre_scores_gemma":[0.95969075,0.00010044703,0.03778583,0.000012288537,0.000006255194,0.00006123946,0.00007191316,0.000030174338,0.0022411137],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99906987,0.000333575,0.000038540937,0.00016905936,0.00019816398,0.00019072316],"domain_scores_gemma":[0.9986883,0.00066988025,0.00021736539,0.00015507879,0.00014467811,0.00012468122],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014359197,0.00048432712,0.0007502168,0.00045377534,0.0006529363,0.0011563844,0.0010261128,0.00088438933,0.0027932357],"category_scores_gemma":[0.002527555,0.00048525733,0.0006580348,0.0007001248,0.0005346847,0.0010969343,0.00089153106,0.0008395139,0.00027799758],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097125965,0.0000826053,0.001327804,0.000026233904,0.000015811196,0.00006463953,0.00012289494,0.9733425,0.0020476738,0.003924846,0.00016115441,0.01878674],"study_design_scores_gemma":[0.0000170309,0.00014574575,0.0013306399,0.000006779691,0.00001582436,0.000022775195,0.00011957956,0.99214786,0.0012693617,0.003699599,0.0012118977,0.000012919692],"about_ca_topic_score_codex":0.011538945,"about_ca_topic_score_gemma":0.012617265,"teacher_disagreement_score":0.011538945,"about_ca_system_score_codex":0.0011911228,"about_ca_system_score_gemma":0.0022924645,"threshold_uncertainty_score":0.022943556},"labels":[],"label_agreement":null},{"id":"W3098264249","doi":"10.1061/9780784482889.112","title":"Constraints of Modular Construction for Fully Serviced and Finished Homes: Lessons Learned from Canada","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modular design; Computer science; Modular construction; Architectural engineering; Programming language; Engineering","score_opus":0.05990698903139564,"score_gpt":0.298302155809413,"score_spread":0.23839516677801736,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3098264249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7942543,0.0193228,0.006853406,0.044404786,0.00024805975,0.0003078966,0.00047207414,0.00006449634,0.13407224],"genre_scores_gemma":[0.9737222,0.010896443,0.0067159114,0.001404631,0.000011246708,0.0000709487,0.00013924,0.000037533882,0.0070019155],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9890282,0.0026746946,0.00064968684,0.0006687508,0.004947398,0.0020313552],"domain_scores_gemma":[0.97758216,0.010402744,0.0011929084,0.0004824914,0.00862709,0.001712678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011894745,0.000436716,0.00069002406,0.002299443,0.013251735,0.0085523855,0.0031070255,0.0015771887,0.0038287987],"category_scores_gemma":[0.022252697,0.00060261454,0.0005226187,0.0065547195,0.0058597527,0.003460724,0.003889417,0.0024518322,0.00020134405],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015969039,0.00019651509,0.037147768,0.004143632,0.0000870573,0.01049896,0.5502892,0.003871129,0.003225012,0.11293454,0.027474675,0.24997176],"study_design_scores_gemma":[0.0000147744,0.00009088465,0.035022445,0.003734829,0.00007286703,0.00085107645,0.73498803,0.0018456891,0.0010252851,0.004832209,0.2173926,0.00012927986],"about_ca_topic_score_codex":0.9609753,"about_ca_topic_score_gemma":0.9844749,"teacher_disagreement_score":0.105191454,"about_ca_system_score_codex":0.105191454,"about_ca_system_score_gemma":0.22988056,"threshold_uncertainty_score":0.763221},"labels":[],"label_agreement":null},{"id":"W3099037304","doi":"10.1061/9780784482865.134","title":"BIM-Based Automated Drafting System in Cabinet Manufacturing","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Rework; Building information modeling; Cabinet (room); Architecture; Automation; Engineering; Systems engineering; Manufacturing engineering; Information model; Information exchange; Computer science; Software engineering; Embedded system; Compatibility (geochemistry); Mechanical engineering","score_opus":0.02753022825820589,"score_gpt":0.2800486264023961,"score_spread":0.2525183981441902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099037304","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023935406,0.00016270396,0.9424959,0.00009813592,0.000049059232,0.00022781234,0.0004371349,0.025481584,0.0071123093],"genre_scores_gemma":[0.37735844,0.00036914073,0.61222565,0.00006461268,0.000021806749,0.00036280602,0.001793876,0.00069375004,0.007109917],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9989986,0.00023161822,0.00007322545,0.00018109685,0.00044034852,0.00007508071],"domain_scores_gemma":[0.99942255,0.00012382834,0.00004896084,0.00018085795,0.0001767884,0.000047021193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010342494,0.00089126086,0.0009655282,0.0014054471,0.0007419692,0.0015135212,0.0014640605,0.0008385006,0.007133475],"category_scores_gemma":[0.001680772,0.0007066237,0.00076916174,0.0010183909,0.00044363632,0.0013767843,0.0014973226,0.0006091705,0.0023172882],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007960951,0.00055258925,0.0038355868,0.000517988,0.000090860536,0.0011830494,0.0012080761,0.32112893,0.070516706,0.019003738,0.015676327,0.56549],"study_design_scores_gemma":[0.000051518182,0.000114169205,0.001629227,0.000033503515,0.00003441014,0.00029328026,0.00013815807,0.9260222,0.037562698,0.0035367534,0.030522272,0.00006172167],"about_ca_topic_score_codex":0.0029801656,"about_ca_topic_score_gemma":0.0025790809,"teacher_disagreement_score":0.007133475,"about_ca_system_score_codex":0.0006399494,"about_ca_system_score_gemma":0.0014430885,"threshold_uncertainty_score":0.023863852},"labels":[],"label_agreement":null},{"id":"W3099049182","doi":"10.1061/9780784482865.001","title":"Adoption and Implementation of BIM in Canadian Construction Projects: Benefits, Challenges, and Limitations","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Construction industry; Business; Construction engineering; Engineering management; Engineering","score_opus":0.08331154799407293,"score_gpt":0.30802405219841145,"score_spread":0.22471250420433853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099049182","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97047937,0.0023286026,0.0016849192,0.0033303357,0.00004421594,0.00035040092,0.0005526506,0.000038314127,0.021191157],"genre_scores_gemma":[0.99007624,0.002843175,0.0042584953,0.00024545033,0.0000060098096,0.00020381933,0.00030359408,0.000017166918,0.002046152],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9842817,0.0030734257,0.0007283684,0.0011623015,0.008195219,0.0025589252],"domain_scores_gemma":[0.98061717,0.004028418,0.001652782,0.0006011535,0.011581941,0.0015184899],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013459251,0.00065109663,0.00071466726,0.004402735,0.008762162,0.005916415,0.0021944875,0.0007952823,0.0014593252],"category_scores_gemma":[0.02673573,0.0006165765,0.000744308,0.012358191,0.0025327057,0.0022090361,0.004382538,0.0012343669,0.000161018],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042980487,0.0004090023,0.47595927,0.002042914,0.00011286455,0.0012437233,0.14668658,0.002405793,0.0017870928,0.008943499,0.005865648,0.35411382],"study_design_scores_gemma":[0.000025245568,0.00022512744,0.7360055,0.0015211428,0.00014806744,0.000359263,0.21115887,0.003944683,0.0015175386,0.0011190877,0.043787777,0.00018774634],"about_ca_topic_score_codex":0.9773521,"about_ca_topic_score_gemma":0.98661995,"teacher_disagreement_score":0.07839527,"about_ca_system_score_codex":0.07839527,"about_ca_system_score_gemma":0.14820741,"threshold_uncertainty_score":0.56880015},"labels":[],"label_agreement":null},{"id":"W3099645286","doi":"10.1051/shsconf/20208202003","title":"Rétro-BIM ou la question de l’intégration : une revue anachronique","year":2020,"lang":"fr","type":"article","venue":"SHS Web of Conferences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Humanities; Philosophy; Political science","score_opus":0.015600524414763357,"score_gpt":0.2390588068294195,"score_spread":0.22345828241465612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3099645286","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009407275,0.6793876,0.05057726,0.14545862,0.007413027,0.000063073996,0.00012382027,0.00023315415,0.107336126],"genre_scores_gemma":[0.26336282,0.63282984,0.03723012,0.02131728,0.011164385,0.0002988753,0.00020636845,0.0008556211,0.03273464],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9803617,0.0097632855,0.0010200501,0.0021913326,0.0059299464,0.00073378044],"domain_scores_gemma":[0.95400727,0.035655614,0.0014190683,0.0037980075,0.0044305283,0.0006894183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02800377,0.0012535314,0.0017632298,0.006973464,0.0038293914,0.020543147,0.0036845375,0.009834549,0.008795444],"category_scores_gemma":[0.0322473,0.0012287158,0.0010181061,0.010473557,0.037456367,0.041623313,0.009886653,0.010658569,0.002483173],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041785814,0.000045594956,0.00051817717,0.0016382469,0.000027813965,0.00012775575,0.010676795,0.0007095764,0.00024004145,0.8089778,0.010018783,0.16697761],"study_design_scores_gemma":[0.000008932938,0.000050145165,0.00064500107,0.0056919656,0.00001937911,0.00045786132,0.013110237,0.00090786925,0.00042747345,0.20644239,0.77219474,0.00004396615],"about_ca_topic_score_codex":0.006872104,"about_ca_topic_score_gemma":0.005647189,"teacher_disagreement_score":0.02800377,"about_ca_system_score_codex":0.010231866,"about_ca_system_score_gemma":0.013676222,"threshold_uncertainty_score":0.14809984},"labels":[],"label_agreement":null},{"id":"W3100011212","doi":"10.1061/9780784482889.050","title":"Constructability Concepts, Significance, and Implementation","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Constructability; Computer science; Construction engineering; Engineering; Systems engineering","score_opus":0.03454713601727984,"score_gpt":0.3460452894964649,"score_spread":0.3114981534791851,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3100011212","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.098351926,0.01673017,0.5073401,0.022426182,0.0006143022,0.0018690018,0.00041757032,0.00057960744,0.3516712],"genre_scores_gemma":[0.8004395,0.008747434,0.17712077,0.0014534232,0.00022402317,0.0019784188,0.00037818498,0.0001878341,0.0094704265],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.96678,0.013724126,0.0032343268,0.002625852,0.012219727,0.0014158776],"domain_scores_gemma":[0.9597576,0.023542743,0.0040429058,0.0030404928,0.008542767,0.0010735061],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024493106,0.0012392458,0.0005859729,0.009227671,0.0027641144,0.009116308,0.0015692583,0.0022315618,0.0040575047],"category_scores_gemma":[0.044154648,0.00062179513,0.0008454545,0.005011511,0.022323808,0.010087001,0.004868658,0.0030657374,0.0005575438],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002459381,0.00007735676,0.0049787676,0.0012961826,0.000034283043,0.00013954379,0.011237822,0.0015192914,0.001011855,0.85573405,0.0019073038,0.12203896],"study_design_scores_gemma":[0.00003094072,0.00031064675,0.022352766,0.0056076148,0.00009297867,0.0010706633,0.031749446,0.0038999545,0.0027794263,0.68037635,0.2516082,0.00012110224],"about_ca_topic_score_codex":0.004306289,"about_ca_topic_score_gemma":0.0028959147,"teacher_disagreement_score":0.024493106,"about_ca_system_score_codex":0.008634388,"about_ca_system_score_gemma":0.01179531,"threshold_uncertainty_score":0.12953353},"labels":[],"label_agreement":null},{"id":"W3101390094","doi":"10.1061/9780784482858.060","title":"A Building Information Modeling Approach for Adaptive Reuse Building Projects","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reuse; Adaptive reuse; Building information modeling; Context (archaeology); Computer science; Circular economy; Sustainability; Resource (disambiguation); Key (lock); Systems engineering; Risk analysis (engineering); Process management; Engineering; Architectural engineering; Business; Operations management","score_opus":0.07656517656907294,"score_gpt":0.30877127726536685,"score_spread":0.2322061006962939,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101390094","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003362276,0.00023347845,0.9690673,0.0007588844,0.000035443263,0.000114152215,0.00025737847,0.00036213687,0.025808947],"genre_scores_gemma":[0.13727584,0.0008745684,0.85059077,0.00017089481,0.00004247827,0.0005465474,0.0009964319,0.0002153424,0.009287147],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99847347,0.0006139925,0.00013749908,0.00017113735,0.00049672293,0.00010723236],"domain_scores_gemma":[0.99884725,0.00050453487,0.00009794024,0.00026165263,0.00021270363,0.00007590875],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020887405,0.0009275228,0.00064429967,0.002948807,0.0012126629,0.0049827257,0.002617223,0.0020233488,0.006129473],"category_scores_gemma":[0.0033872456,0.0007848032,0.0020467287,0.0036876549,0.0015856542,0.0049092686,0.0034985975,0.0019849327,0.0016186638],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015302488,0.000051419927,0.00050058943,0.00009542863,0.000022352046,0.00021208264,0.00079679064,0.12470002,0.0008045535,0.8421356,0.0021968887,0.028468966],"study_design_scores_gemma":[0.000017067034,0.00002900671,0.00029109896,0.00016265416,0.000043517037,0.00021152952,0.00057701085,0.57630324,0.0011575115,0.29855037,0.12261631,0.000040656563],"about_ca_topic_score_codex":0.009935931,"about_ca_topic_score_gemma":0.011403289,"teacher_disagreement_score":0.009935931,"about_ca_system_score_codex":0.002282233,"about_ca_system_score_gemma":0.0023678637,"threshold_uncertainty_score":0.02050513},"labels":[],"label_agreement":null},{"id":"W3101474751","doi":"10.1504/ijspm.2021.10033514","title":"Discrete-event simulation and data analysis for process flow improvements in a cabinet manufacturing facility","year":2020,"lang":"en","type":"article","venue":"International Journal of Simulation and Process Modelling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Cabinet (room); Process (computing); Computer science; Event (particle physics); Engineering; Manufacturing engineering; Engineering drawing; Reliability engineering; Simulation; Operating system; Mechanical engineering","score_opus":0.05267938806846174,"score_gpt":0.3334885804854536,"score_spread":0.28080919241699187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3101474751","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71205616,0.00011873662,0.27775767,0.00029964387,0.000033011678,0.00027869057,0.0008291303,0.0018259707,0.006800999],"genre_scores_gemma":[0.96399474,0.000062249186,0.034765054,0.000011860134,0.0000024157976,0.00011042664,0.00024018902,0.000028126573,0.00078491506],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957854,0.00016380948,0.000029580522,0.000060298582,0.00012129494,0.000046538204],"domain_scores_gemma":[0.9982462,0.0013053517,0.0000911467,0.00009617321,0.00019607006,0.00006508025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011496476,0.000572471,0.00060913863,0.000793193,0.00058891263,0.001051959,0.0007302006,0.00085283525,0.0020537816],"category_scores_gemma":[0.0022544651,0.00036805662,0.00059425447,0.0007010167,0.0004314941,0.0005292378,0.00045232143,0.0006343255,0.00015548224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001398468,0.00008041801,0.0020748586,0.00003197136,0.000009931061,0.000061023275,0.000079872516,0.99052835,0.0012646806,0.00090032513,0.00010072807,0.00472791],"study_design_scores_gemma":[0.000006804776,0.000015988993,0.00023718918,0.0000019031404,0.0000021673195,0.000003726893,0.000019161116,0.99865013,0.00077053753,0.00016322525,0.00012579386,0.0000033575916],"about_ca_topic_score_codex":0.016788434,"about_ca_topic_score_gemma":0.009326594,"teacher_disagreement_score":0.016788434,"about_ca_system_score_codex":0.001174391,"about_ca_system_score_gemma":0.0015153454,"threshold_uncertainty_score":0.033381402},"labels":[],"label_agreement":null},{"id":"W3102924148","doi":"10.1061/9780784482865.100","title":"The Performance Evaluation of Different Modular Construction Supply Chain Configurations Using Discrete Event Simulation","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Supply chain; Discrete event simulation; Context (archaeology); Computer science; Supply chain management; Event (particle physics); Prefabrication; Service management; Systems engineering; Key (lock); Engineering; Business; Simulation; Civil engineering","score_opus":0.057320993484668264,"score_gpt":0.33704914291914795,"score_spread":0.27972814943447966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3102924148","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96433204,0.00009371196,0.02992166,0.00008366938,0.00002510917,0.00014337199,0.00036057257,0.0002167354,0.0048231306],"genre_scores_gemma":[0.9952957,0.00004644592,0.004150076,0.0000045858533,0.0000011822368,0.000057335554,0.00012448005,0.000004932004,0.00031523642],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991289,0.00038999223,0.0000549855,0.00009673419,0.00017675111,0.00015264911],"domain_scores_gemma":[0.99699616,0.002057143,0.00026342753,0.00019316067,0.0003531039,0.0001370335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019782514,0.00097005453,0.00076929404,0.0012610027,0.0005220693,0.0013578902,0.0007863082,0.0010692338,0.0016792478],"category_scores_gemma":[0.003300516,0.0003230377,0.00087250135,0.0010120859,0.0005504886,0.00085708156,0.000640093,0.00065615145,0.00014923753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010417957,0.00006636965,0.001989235,0.000029187595,0.000017395945,0.00004165826,0.000028192735,0.99421376,0.00084427634,0.0005680398,0.000041050243,0.0020566173],"study_design_scores_gemma":[0.00001328115,0.00014484418,0.00065547193,0.0000053399367,0.000011782358,0.000007442608,0.000043152322,0.9974221,0.0013829843,0.00020710015,0.00009790614,0.000008609896],"about_ca_topic_score_codex":0.011035016,"about_ca_topic_score_gemma":0.0050970637,"teacher_disagreement_score":0.011035016,"about_ca_system_score_codex":0.0014058287,"about_ca_system_score_gemma":0.0009016009,"threshold_uncertainty_score":0.021941602},"labels":[],"label_agreement":null},{"id":"W3103651076","doi":"10.1061/9780784482889.052","title":"A Comparative Study of Offsite Construction Manufacturing Techniques","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Construction industry; Factory (object-oriented programming); Automation; Variance (accounting); Risk analysis (engineering); Manufacturing engineering; Engineering; Construction engineering; Computer science; Business","score_opus":0.056000744286547645,"score_gpt":0.33063580278886495,"score_spread":0.2746350585023173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3103651076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90304404,0.0014233557,0.016144646,0.00018775013,0.000051282816,0.0006072028,0.0001883669,0.00009157693,0.07826184],"genre_scores_gemma":[0.93937147,0.0017107419,0.046487797,0.00006611673,0.000022882019,0.00026896977,0.00030506187,0.00009463904,0.011672461],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9883194,0.004749573,0.0005164652,0.00057173433,0.00516649,0.0006763211],"domain_scores_gemma":[0.98409545,0.008004247,0.0013781937,0.0026094785,0.0033697519,0.0005429326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005654697,0.0006792436,0.0007082033,0.007128198,0.0020194347,0.0032585987,0.0016905747,0.0011288143,0.008548396],"category_scores_gemma":[0.013658338,0.0004696554,0.0010710398,0.006653736,0.0015622845,0.0018305323,0.002869248,0.00096847076,0.0010920261],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016501722,0.002516729,0.04178096,0.003377975,0.00020781181,0.0029830516,0.04135154,0.007581101,0.042753592,0.019121058,0.0023204552,0.8343556],"study_design_scores_gemma":[0.00024587917,0.021216476,0.46312577,0.0035155197,0.0006816634,0.01355232,0.16303058,0.012815702,0.049607176,0.009867677,0.2619122,0.00042898103],"about_ca_topic_score_codex":0.002464446,"about_ca_topic_score_gemma":0.011711645,"teacher_disagreement_score":0.008548396,"about_ca_system_score_codex":0.0030970208,"about_ca_system_score_gemma":0.0023743731,"threshold_uncertainty_score":0.02990526},"labels":[],"label_agreement":null},{"id":"W3104880028","doi":"10.1061/9780784482865.121","title":"BIM-Based Automated Drainage System Design in Prefabrication Construction","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Prefabrication; Construction management; Schedule; Engineering; Building information modeling; Drainage; Plan (archaeology); Process (computing); Construction engineering; Systems engineering; Computer science; Civil engineering; Scheduling (production processes)","score_opus":0.04206526126104443,"score_gpt":0.2903254104353058,"score_spread":0.24826014917426137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3104880028","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026513165,0.000056091387,0.9647369,0.000056013017,0.000013958922,0.00009758974,0.0001389638,0.0024332085,0.0059541026],"genre_scores_gemma":[0.411408,0.00013350621,0.5840293,0.000032597607,0.000006214513,0.00020392702,0.0004754921,0.00035106088,0.0033598708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992526,0.00020564091,0.000038146587,0.00010431148,0.00033123422,0.000067983936],"domain_scores_gemma":[0.99962044,0.00012431461,0.000036462334,0.00008679445,0.000111344816,0.000020610672],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073355954,0.0006533842,0.00067777827,0.00088084163,0.00056639966,0.0011940235,0.0010291345,0.0006134786,0.004277569],"category_scores_gemma":[0.001210631,0.00066942704,0.0008642726,0.00071010843,0.0005096394,0.0009655709,0.0011201788,0.0005408113,0.0009387187],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007796515,0.000090507245,0.0013087147,0.000098785,0.000021716374,0.00015189973,0.00026242118,0.82886624,0.01122522,0.009278581,0.0013433612,0.14727454],"study_design_scores_gemma":[0.000010503197,0.000030794163,0.00044099896,0.0000092623495,0.00000825988,0.000054217136,0.00004518797,0.9859351,0.005226061,0.0028612579,0.0053671673,0.000011187411],"about_ca_topic_score_codex":0.006027837,"about_ca_topic_score_gemma":0.007412554,"teacher_disagreement_score":0.006027837,"about_ca_system_score_codex":0.0006813146,"about_ca_system_score_gemma":0.0015217048,"threshold_uncertainty_score":0.014309883},"labels":[],"label_agreement":null},{"id":"W3105029984","doi":"10.1061/9780784482865.112","title":"Implementation of Building Information Modeling on Construction Site: Addressing the Technology Gap","year":2020,"lang":"en","type":"article","venue":"Construction Research Congress 2020","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Building information modeling; Computer science; Virtual reality; Visualization; Leverage (statistics); Field (mathematics); Human–computer interaction; Engineering","score_opus":0.07878585115898361,"score_gpt":0.3558098308802662,"score_spread":0.27702397972128256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105029984","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.043017585,0.00037471834,0.8995455,0.0012146763,0.00009196715,0.0001166463,0.00005114507,0.0022947334,0.053292997],"genre_scores_gemma":[0.476978,0.0007478883,0.5121878,0.00019127615,0.000043309825,0.00017156672,0.0003564518,0.000557211,0.0087664565],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9957974,0.0015504165,0.00015133843,0.00030377845,0.0018393442,0.00035766247],"domain_scores_gemma":[0.9967505,0.0007852031,0.00014039417,0.0016321794,0.00044644714,0.0002452727],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033823636,0.0004999185,0.00043963984,0.0010054566,0.0009834873,0.0050453567,0.0026993027,0.0012372761,0.0040863366],"category_scores_gemma":[0.0041761994,0.00051245984,0.000615865,0.00087479973,0.0018050873,0.00534321,0.0055316063,0.0013798638,0.0012581503],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019421308,0.00058625464,0.0047239214,0.00054457755,0.00006182662,0.0006879531,0.007352471,0.07479228,0.028466405,0.40549448,0.005416522,0.47167915],"study_design_scores_gemma":[0.000103002116,0.0006114975,0.0041799247,0.0005689593,0.00011047627,0.0010097775,0.005380211,0.32555225,0.06045515,0.08150672,0.5203691,0.00015299676],"about_ca_topic_score_codex":0.002282548,"about_ca_topic_score_gemma":0.0026162136,"teacher_disagreement_score":0.0050453567,"about_ca_system_score_codex":0.0013435622,"about_ca_system_score_gemma":0.002792485,"threshold_uncertainty_score":0.01788789},"labels":[],"label_agreement":null},{"id":"W3105746603","doi":"10.1016/j.autcon.2020.103447","title":"An A-Star algorithm for semi-optimization of crane location and configuration in modular construction","year":2020,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"University of Tehran","keywords":"Lift (data mining); Modular design; Plan (archaeology); Renting; A* search algorithm; Engineering; Computer science; Industrial engineering; Transport engineering; Algorithm; Civil engineering; Data mining","score_opus":0.007463724938484093,"score_gpt":0.20980891541327293,"score_spread":0.20234519047478883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3105746603","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055289124,0.000090081805,0.99199027,0.000051453066,0.000040011735,0.00005614111,0.000054386903,0.00049658946,0.0016921771],"genre_scores_gemma":[0.14753038,0.00011719913,0.8481839,0.00012811625,0.00004346827,0.00035484385,0.00030198233,0.00038595818,0.002954157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993001,0.0002739031,0.00004289966,0.00012667174,0.00018860378,0.00006787891],"domain_scores_gemma":[0.9979863,0.0012724577,0.00010019399,0.00014930867,0.00037290718,0.000118882475],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019335295,0.001306353,0.0021125618,0.0010230113,0.00088018307,0.0012169367,0.0021294623,0.0020421448,0.005883227],"category_scores_gemma":[0.0034224177,0.0014188915,0.0015414732,0.0013788023,0.0011389528,0.001427931,0.0023179695,0.0017015226,0.0014564943],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013375437,0.000097763594,0.00025852266,0.00008420349,0.00004515146,0.00003570072,0.000055131808,0.91006035,0.0010274729,0.0071717896,0.0022076543,0.07882258],"study_design_scores_gemma":[0.000011023578,0.000021446158,0.0000211,0.0000036494523,0.0000022254617,0.0000043486575,0.000004892098,0.99820566,0.00017376435,0.0012869311,0.0002623483,0.0000025826298],"about_ca_topic_score_codex":0.012481292,"about_ca_topic_score_gemma":0.012785029,"teacher_disagreement_score":0.012481292,"about_ca_system_score_codex":0.00083571,"about_ca_system_score_gemma":0.0033002023,"threshold_uncertainty_score":0.024817288},"labels":[],"label_agreement":null},{"id":"W3106331011","doi":"10.18280/ijsdp.150702","title":"Integration of Life Cycle Data in a BIM Object Library to Support Green and Digital Public Procurements","year":2020,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Procurement; Workflow; Building information modeling; Sustainability; Life-cycle assessment; Process (computing); Environmental impact assessment; Decision support system; Sustainable design; Environmental economics; Process management; Computer science; Business; Database; Environmental resource management; Engineering; Operations management; Production (economics); Environmental science; Economics","score_opus":0.02726781322083916,"score_gpt":0.2385612398149807,"score_spread":0.21129342659414155,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3106331011","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065788426,0.0005532015,0.8240903,0.0005448184,0.00017970128,0.0013226687,0.014437745,0.07282672,0.020256408],"genre_scores_gemma":[0.38570943,0.0009666026,0.5553971,0.00025955835,0.0001014634,0.0015569796,0.044202995,0.0041139047,0.0076918863],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9960311,0.00090910675,0.00064701645,0.00045512576,0.0017710687,0.00018659273],"domain_scores_gemma":[0.99438184,0.0013086459,0.00050722866,0.0019082753,0.0015754453,0.00031865036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055053513,0.0012215541,0.0012784104,0.0091091385,0.000871489,0.0050530126,0.0017697832,0.0008335786,0.0057531013],"category_scores_gemma":[0.009444383,0.0007160416,0.0009921376,0.006798878,0.00048724897,0.00425346,0.0031335396,0.00092829455,0.003994947],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012441279,0.002267182,0.022995047,0.0017410554,0.00050637504,0.0010468807,0.0040676952,0.077486746,0.022484053,0.023837628,0.0335842,0.8087389],"study_design_scores_gemma":[0.00021291767,0.0004970898,0.028459897,0.00075440534,0.00046049422,0.00084210694,0.0024289994,0.5871235,0.07969492,0.033732485,0.26522672,0.0005665154],"about_ca_topic_score_codex":0.0035232932,"about_ca_topic_score_gemma":0.003257835,"teacher_disagreement_score":0.0091091385,"about_ca_system_score_codex":0.0012370022,"about_ca_system_score_gemma":0.0026964585,"threshold_uncertainty_score":0.029115438},"labels":[],"label_agreement":null},{"id":"W3108037149","doi":"10.1108/ecam-01-2020-0027","title":"An integrated BIM-based approach for cost estimation in construction projects","year":2020,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":81,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cost estimate; Agile software development; Process (computing); Estimation; Building information modeling; Computer science; Systems engineering; Cost engineering; TRACE (psycholinguistics); Scheme (mathematics); Industrial engineering; Reliability engineering; Risk analysis (engineering); Engineering; Software engineering; Operations management","score_opus":0.011558966832562047,"score_gpt":0.2072388985586022,"score_spread":0.19567993172604015,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3108037149","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0190926,0.00025296398,0.9672953,0.00018356912,0.000035420013,0.00029281795,0.00076978555,0.0014335519,0.010644037],"genre_scores_gemma":[0.27838224,0.0005122532,0.7157244,0.00006146326,0.00002378715,0.00066248083,0.0017021664,0.00019658454,0.0027345885],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99545336,0.0014555132,0.00030667672,0.0003747878,0.0022419656,0.0001676448],"domain_scores_gemma":[0.99748445,0.0006053863,0.00035193848,0.00037305287,0.0011083655,0.00007670767],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026992399,0.0013431829,0.00086306204,0.0070561375,0.0006670643,0.0036076733,0.0017471128,0.00082967815,0.0035161884],"category_scores_gemma":[0.0069676256,0.0008227602,0.0010369637,0.005438267,0.000492192,0.0032081415,0.0024692628,0.000856706,0.0013046527],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011324158,0.00033356954,0.013784847,0.0006188773,0.0001811111,0.00033440228,0.00086622156,0.33515692,0.006068013,0.040734686,0.0072254734,0.5945826],"study_design_scores_gemma":[0.000019635065,0.00010198859,0.013765034,0.00022422997,0.00007343448,0.0003259333,0.000944595,0.9386917,0.004850193,0.016846905,0.024042638,0.00011373842],"about_ca_topic_score_codex":0.006935978,"about_ca_topic_score_gemma":0.008096096,"teacher_disagreement_score":0.0070561375,"about_ca_system_score_codex":0.0016475995,"about_ca_system_score_gemma":0.0020184172,"threshold_uncertainty_score":0.014275134},"labels":[],"label_agreement":null},{"id":"W3110450806","doi":"10.1201/9781003078678-31","title":"Tele-operated shotcrete spraying with the Meyco Robojet Logica","year":2020,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Shotcrete; Computer science; Geology; Geotechnical engineering","score_opus":0.01346413688596095,"score_gpt":0.16832434258339782,"score_spread":0.15486020569743686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110450806","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42078334,0.0020980495,0.35230818,0.001577176,0.0004401441,0.003462497,0.00202955,0.025410613,0.19189042],"genre_scores_gemma":[0.5653797,0.0007283309,0.2779519,0.0006739996,0.00008140472,0.001012492,0.0021079318,0.00091307703,0.1511512],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99902177,0.00006696299,0.00002206736,0.0001784078,0.00060882734,0.000102058184],"domain_scores_gemma":[0.99931455,0.0001255857,0.000052792006,0.0000842392,0.00033045045,0.00009237345],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010504894,0.00050224504,0.00048399667,0.0008854235,0.0005789558,0.0008698409,0.0010259476,0.00053275994,0.0147765335],"category_scores_gemma":[0.0009321918,0.00037892192,0.00027797345,0.00040229113,0.00053499057,0.00073477277,0.0009707309,0.00078332715,0.002420125],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019066168,0.00073054084,0.0053715757,0.00047470332,0.00004160038,0.00070763717,0.0013340041,0.0028891454,0.33929047,0.0078060767,0.028642824,0.61080474],"study_design_scores_gemma":[0.000900829,0.0064717666,0.0511877,0.00029364845,0.0001288644,0.0022017094,0.0008166717,0.074125834,0.23514903,0.0012372048,0.62713784,0.0003489384],"about_ca_topic_score_codex":0.019894479,"about_ca_topic_score_gemma":0.03535564,"teacher_disagreement_score":0.019894479,"about_ca_system_score_codex":0.0014190787,"about_ca_system_score_gemma":0.0017599864,"threshold_uncertainty_score":0.049432397},"labels":[],"label_agreement":null},{"id":"W3110637868","doi":"10.1139/cjce-2020-0346","title":"Optimizing the prefabrication finishing level in modular construction","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Modular construction; Engineering; Range (aeronautics); Frame (networking); Computer science; Civil engineering; Mechanical engineering","score_opus":0.01642939992951922,"score_gpt":0.1735212052624965,"score_spread":0.15709180533297729,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3110637868","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4223689,0.00027267466,0.56586844,0.00014266114,0.00001598658,0.00022475107,0.00016299689,0.00018196349,0.010761669],"genre_scores_gemma":[0.9228818,0.000166193,0.0748766,0.000011558225,0.0000024719009,0.00012507969,0.00006832286,0.00004179317,0.0018262728],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992762,0.0002790327,0.000019530115,0.00010719153,0.00016274763,0.00015526527],"domain_scores_gemma":[0.9994481,0.00032909814,0.00010334499,0.000030786025,0.000056165572,0.000032570526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013915389,0.0011316049,0.0009376875,0.00091506355,0.00061231176,0.0013848369,0.000875014,0.0012863304,0.0019125938],"category_scores_gemma":[0.0022814125,0.00097391807,0.0008316602,0.0010336151,0.0008363301,0.001355871,0.00073748967,0.00080910267,0.00022944021],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020657397,0.000026828864,0.00038589488,0.00002077233,0.000003818447,0.000024955363,0.000015794092,0.9934482,0.0009196312,0.001072216,0.00003925307,0.004021999],"study_design_scores_gemma":[0.000015960319,0.00015242455,0.00089653,0.000013365711,0.000013329242,0.000024699348,0.00006331064,0.9944323,0.0012205138,0.0027909959,0.00036380364,0.000012658396],"about_ca_topic_score_codex":0.013048721,"about_ca_topic_score_gemma":0.018409302,"teacher_disagreement_score":0.013048721,"about_ca_system_score_codex":0.0018485677,"about_ca_system_score_gemma":0.0021594092,"threshold_uncertainty_score":0.025945485},"labels":[],"label_agreement":null},{"id":"W3112129799","doi":"10.1061/(asce)cp.1943-5487.0000948","title":"Numerical-Based Approach for Updating Simulation Input in Real Time","year":2020,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Probabilistic logic; Markov chain Monte Carlo; Monte Carlo method; Reliability (semiconductor); Stochastic simulation; Markov chain; Stochastic modelling; Data mining; Mathematical optimization; Algorithm; Bayesian probability; Machine learning; Artificial intelligence; Mathematics; Statistics","score_opus":0.013217769158576573,"score_gpt":0.22581069349179042,"score_spread":0.21259292433321386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112129799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022109456,0.00002331551,0.99646497,0.000030411942,0.000019003684,0.000022460938,0.000016276057,0.00037049665,0.00084211415],"genre_scores_gemma":[0.23958719,0.00010069206,0.75834703,0.000098979915,0.000039263654,0.00023816281,0.00016687761,0.00025486125,0.0011669762],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987915,0.00032736926,0.00008831349,0.00021967155,0.0005070733,0.00006598737],"domain_scores_gemma":[0.9976376,0.000986585,0.00024648852,0.00035908012,0.0007066079,0.0000636262],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017846437,0.0008774666,0.00086917484,0.0011925175,0.00054034294,0.0012205528,0.0020100733,0.0010978596,0.0035095902],"category_scores_gemma":[0.007350466,0.00064960594,0.0006531797,0.00092846976,0.0007495879,0.001379584,0.0014480884,0.0014670414,0.0008134173],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044736655,0.000049950675,0.00063893036,0.000064834036,0.000033064065,0.000053209704,0.00009702844,0.9198287,0.0049889334,0.015395343,0.00054141815,0.05826385],"study_design_scores_gemma":[0.0000031771174,0.0000076278566,0.000032910866,0.0000035441446,0.0000038941075,0.000009657791,0.000004239359,0.9965054,0.0007814073,0.0019678196,0.000676418,0.0000038968938],"about_ca_topic_score_codex":0.004604545,"about_ca_topic_score_gemma":0.0048571383,"teacher_disagreement_score":0.004604545,"about_ca_system_score_codex":0.0008697751,"about_ca_system_score_gemma":0.0016488526,"threshold_uncertainty_score":0.011740744},"labels":[],"label_agreement":null},{"id":"W3112371688","doi":"10.1007/s00371-021-02155-w","title":"Graph-based generative representation learning of semantically and behaviorally augmented floorplans","year":2021,"lang":"en","type":"article","venue":"The Visual Computer","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Rehabilitation Institute; York University","funders":"National Science Foundation","keywords":"Floorplan; Embedding; Autoencoder; Representation (politics); Node (physics); Graph; Semantics (computer science); Generative model; Enhanced Data Rates for GSM Evolution","score_opus":0.013271570323956065,"score_gpt":0.2607217686973074,"score_spread":0.24745019837335133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3112371688","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07167786,0.00018443294,0.9200527,0.00021078256,0.00005298201,0.00009219532,0.00057387963,0.0040021706,0.003153065],"genre_scores_gemma":[0.8215194,0.00018257549,0.172469,0.00014065632,0.000027144255,0.00014532302,0.0024803216,0.00046703633,0.0025686473],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994454,0.00014836363,0.000018959183,0.00021553393,0.000103683116,0.00006814935],"domain_scores_gemma":[0.9980404,0.0012489585,0.00009453463,0.00030360563,0.00022589786,0.00008654353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064142066,0.0010974376,0.0010031058,0.0015123355,0.00042007334,0.0012624165,0.002174817,0.0012205737,0.0064427406],"category_scores_gemma":[0.0038586373,0.0008816969,0.001656175,0.0013848565,0.0011213805,0.0018184892,0.0017495537,0.001982401,0.0010744649],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034231687,0.00022668764,0.0025675786,0.0001882047,0.00012676443,0.00023747001,0.00036147833,0.6415582,0.006955452,0.026292386,0.0044386485,0.31670484],"study_design_scores_gemma":[0.000011498862,0.0000232058,0.00019382949,0.000009502375,0.000010853885,0.00001628165,0.00002986312,0.98711187,0.0007279768,0.011533924,0.00032523856,0.0000059784647],"about_ca_topic_score_codex":0.012195924,"about_ca_topic_score_gemma":0.023323525,"teacher_disagreement_score":0.012195924,"about_ca_system_score_codex":0.0010422434,"about_ca_system_score_gemma":0.0012552285,"threshold_uncertainty_score":0.024249852},"labels":[],"label_agreement":null},{"id":"W3113011181","doi":"10.29173/mocs188","title":"A Framework for Comparative Evaluation of the Life Cycle Sustainability of Modular and Conventional Buildings","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Sustainability; Analytic hierarchy process; Modular design; Process (computing); Multiple-criteria decision analysis; Engineering; Factory (object-oriented programming); Modular construction; Life-cycle assessment; Architectural engineering; Construction engineering; Key (lock); Systems engineering; Computer science; Operations research; Production (economics)","score_opus":0.03029052058977919,"score_gpt":0.27301491978421866,"score_spread":0.24272439919443947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3113011181","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034117945,0.0078333635,0.86405003,0.0018410785,0.00017177292,0.0017688915,0.00077755033,0.00028830543,0.0891511],"genre_scores_gemma":[0.41415897,0.0031451636,0.57810974,0.000150207,0.000058021626,0.002067459,0.00047523557,0.00004674518,0.0017884627],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9883083,0.0075729834,0.0005581436,0.00058989454,0.002414105,0.0005565729],"domain_scores_gemma":[0.9925247,0.0044085872,0.0007216745,0.00030495584,0.0017884423,0.000251683],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015862027,0.0015757527,0.0011067427,0.014362131,0.0013500866,0.0059704906,0.0024583556,0.0013245903,0.0039043264],"category_scores_gemma":[0.013983942,0.0003500885,0.0016158834,0.009085028,0.0036945147,0.005325106,0.0036277114,0.0013907294,0.00033163253],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000076004704,0.00023810154,0.0027823446,0.0012292102,0.000107037435,0.0002572567,0.0015268784,0.06797484,0.0015358974,0.8294611,0.0022868495,0.09252448],"study_design_scores_gemma":[0.000076640965,0.0010091967,0.0075034406,0.0032524993,0.00022801169,0.0005041296,0.011286854,0.24983357,0.0030813464,0.6225955,0.10041417,0.00021465932],"about_ca_topic_score_codex":0.01035734,"about_ca_topic_score_gemma":0.009027686,"teacher_disagreement_score":0.015862027,"about_ca_system_score_codex":0.010487359,"about_ca_system_score_gemma":0.0074747773,"threshold_uncertainty_score":0.08388746},"labels":[],"label_agreement":null},{"id":"W3114067184","doi":"10.29173/mocs242","title":"Front matter, 2016 MOC Summit proceedings","year":2016,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Modular design; Political science; Geography; Computer science; Meteorology; Physical geography; Operating system","score_opus":0.005974345350090887,"score_gpt":0.19114914004325637,"score_spread":0.18517479469316547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114067184","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012594323,0.0016256863,0.00048207724,0.009785788,0.01100601,0.00007701843,0.0033862265,0.00044328315,0.9719345],"genre_scores_gemma":[0.0030235837,0.00095667347,0.00025400202,0.00045056114,0.00081253215,0.000025251244,0.0016670185,0.0001424333,0.992668],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99913543,0.000043838256,0.000030677205,0.00008171909,0.0006004378,0.0001078583],"domain_scores_gemma":[0.9980539,0.0000942386,0.000058037014,0.00009956694,0.0010117663,0.00068242784],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0009012651,0.0007011554,0.0003807447,0.0016289024,0.0022593464,0.0055818385,0.0007918047,0.0017133362,0.54892474],"category_scores_gemma":[0.0029495445,0.00018114396,0.0002626254,0.0011975146,0.0008060034,0.0017439548,0.0026270172,0.001393728,0.38526657],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022358478,0.000023006805,0.00016783114,0.000067233595,9.92011e-7,0.00003925731,0.000040051942,0.000046976646,0.000120547964,0.0016510544,0.95175785,0.046062957],"study_design_scores_gemma":[0.0000022146723,0.000004127173,0.00044396854,0.000070949754,6.0553054e-7,0.000013500704,0.00006785567,0.00003322166,0.00008794191,0.00045987286,0.9988133,0.0000024803537],"about_ca_topic_score_codex":0.022028808,"about_ca_topic_score_gemma":0.095410794,"teacher_disagreement_score":0.54892474,"about_ca_system_score_codex":0.003019917,"about_ca_system_score_gemma":0.0045275115,"threshold_uncertainty_score":0.6434041},"labels":[],"label_agreement":null},{"id":"W3114351658","doi":"10.29173/mocs240","title":"Front Matter, 2018 MOC Summit proceedings","year":2018,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Summit; Hollywood; Front (military); Modular design; Engineering; Political science; History; Computer science; Geography; Art history; Physical geography; Operating system; Mechanical engineering","score_opus":0.007392005693353505,"score_gpt":0.19658651180212025,"score_spread":0.18919450610876676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114351658","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011490041,0.0011333338,0.0006622212,0.0084304875,0.0076874634,0.000069587346,0.0031052814,0.0006297227,0.9771329],"genre_scores_gemma":[0.0032702328,0.00077085436,0.0003693758,0.00052112126,0.00082079874,0.00004156419,0.0019530293,0.00021218802,0.9920407],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99930227,0.00004107359,0.000022148812,0.0000727503,0.0004666267,0.00009513798],"domain_scores_gemma":[0.99830246,0.00010126741,0.000055063545,0.00008837343,0.00089388335,0.00055889215],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0008087611,0.00065849285,0.00036251696,0.0017422803,0.0020071885,0.005284276,0.00085755135,0.0016989075,0.6143345],"category_scores_gemma":[0.0027171373,0.00015173657,0.0002262408,0.0010143791,0.0006657226,0.0020609745,0.002607388,0.0014392807,0.4414699],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017814478,0.000025693198,0.00011185744,0.000054927383,7.452483e-7,0.000034417517,0.000032724747,0.000031391945,0.000108688204,0.0014853346,0.95202184,0.04607461],"study_design_scores_gemma":[0.0000024307305,0.000004592065,0.00034275802,0.000058601225,6.2807607e-7,0.000012937657,0.00006008212,0.000041518004,0.000094767136,0.00050904736,0.99887043,0.0000020721916],"about_ca_topic_score_codex":0.007992035,"about_ca_topic_score_gemma":0.037583128,"teacher_disagreement_score":0.6143345,"about_ca_system_score_codex":0.0022131242,"about_ca_system_score_gemma":0.00272101,"threshold_uncertainty_score":0.550105},"labels":[],"label_agreement":null},{"id":"W3114576278","doi":"10.1201/9780203752005-26","title":"The Development of High Performance Concrete in North America","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Development (topology); Mathematics","score_opus":0.007544196079012059,"score_gpt":0.17109736295162525,"score_spread":0.1635531668726132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114576278","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017405165,0.03313448,0.0020107385,0.002482069,0.00039913162,0.000017462353,0.000040829116,0.00006640796,0.94444376],"genre_scores_gemma":[0.211219,0.0505873,0.0066693393,0.0014146499,0.00020807207,0.000049092207,0.00013923054,0.00011562679,0.72959775],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99971324,0.000032480453,0.0000067189894,0.00004257984,0.00016053871,0.00004445907],"domain_scores_gemma":[0.99988365,0.000020526404,0.000012961221,0.00000856058,0.00005533341,0.000018990953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020571101,0.00028984566,0.00013192871,0.0006361439,0.0023893293,0.0021884984,0.0003407633,0.0006895507,0.009723658],"category_scores_gemma":[0.00021207193,0.00026265543,0.00015267149,0.0010753385,0.0011473293,0.0012636412,0.0010431579,0.00097417476,0.0019343043],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029935676,0.00008154357,0.0025082803,0.0005802715,0.000007626171,0.0011679291,0.017886352,0.0018474512,0.0071912655,0.42969796,0.14588875,0.39311272],"study_design_scores_gemma":[8.9190473e-7,0.000006172222,0.0015085355,0.00013703623,0.000001812195,0.00019106363,0.0010297511,0.00007518166,0.000420896,0.003390389,0.99323326,0.0000049147666],"about_ca_topic_score_codex":0.062127095,"about_ca_topic_score_gemma":0.28806597,"teacher_disagreement_score":0.9378729,"about_ca_system_score_codex":0.0060322727,"about_ca_system_score_gemma":0.0041929795,"threshold_uncertainty_score":0.123530924},"labels":[],"label_agreement":null},{"id":"W3114709915","doi":"10.29173/mocs177","title":"Modularization Business Case Analysis Tool: Learning from Industry Practices","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Process (computing); Computer science; Process management; Software engineering; Scope (computer science); Business case; Business process; Business analysis; Operations management; Engineering; Business model; Work in process; Business; Marketing; Programming language","score_opus":0.020773948248158272,"score_gpt":0.2196472760852575,"score_spread":0.1988733278370992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3114709915","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.024638016,0.0007062187,0.9162015,0.0046822103,0.00019960119,0.0017723251,0.0017308302,0.011232746,0.038836654],"genre_scores_gemma":[0.03945631,0.0006619293,0.9519542,0.0002551461,0.000046911704,0.00093568966,0.0020757013,0.00083447224,0.0037795922],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98845685,0.0049552363,0.0012379752,0.0011293826,0.003774398,0.00044612118],"domain_scores_gemma":[0.9396512,0.04114269,0.00213408,0.0058873934,0.010047895,0.0011367301],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019502815,0.002091141,0.0009901989,0.008261633,0.0018451808,0.008066889,0.00479329,0.0017643992,0.009315956],"category_scores_gemma":[0.05847605,0.0012617944,0.0014722084,0.0055087935,0.0017633061,0.008875418,0.0059119603,0.0037776541,0.0052877907],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000119743454,0.0011871075,0.006218824,0.001654217,0.00009546435,0.0011365695,0.018580182,0.011415986,0.0051753703,0.0744422,0.06979261,0.8101817],"study_design_scores_gemma":[0.00034910307,0.00048764006,0.0068629645,0.006108875,0.00014394152,0.002151412,0.016401267,0.11650912,0.015503622,0.19448769,0.6405821,0.00041232718],"about_ca_topic_score_codex":0.002373166,"about_ca_topic_score_gemma":0.00429739,"teacher_disagreement_score":0.019502815,"about_ca_system_score_codex":0.002860073,"about_ca_system_score_gemma":0.004428433,"threshold_uncertainty_score":0.10314202},"labels":[],"label_agreement":null},{"id":"W3116558508","doi":"10.18280/ijdne.150601","title":"Assessing the Applicability of Green Building Information Modelling for Existing Green Buildings","year":2020,"lang":"en","type":"article","venue":"International Journal of Design & Nature and Ecodynamics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Green building; Building information modeling; Architectural engineering; Sustainability; Construction engineering; Engineering; Efficient energy use; Systems engineering; Computer science; Operations management","score_opus":0.02280853003981419,"score_gpt":0.26853049929075856,"score_spread":0.24572196925094436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3116558508","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7281499,0.0022886633,0.1731696,0.002118185,0.000110716595,0.0013194234,0.0011560299,0.0004228612,0.09126454],"genre_scores_gemma":[0.9144963,0.0015701678,0.08111276,0.000103752755,0.00002087062,0.00039761155,0.0007355927,0.00005638691,0.001506572],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9865715,0.0057295584,0.0008885749,0.00067660486,0.0055580125,0.00057575427],"domain_scores_gemma":[0.9635484,0.021588854,0.0022802055,0.004029835,0.008137184,0.00041551396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0147842895,0.0006699743,0.0004893468,0.005531987,0.0010468005,0.004997561,0.0014794405,0.0014563417,0.0035006145],"category_scores_gemma":[0.047739103,0.00047337558,0.0010487775,0.0045728963,0.0012845204,0.0069977427,0.0031428584,0.0010896875,0.0007940616],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005511099,0.0010588664,0.14250064,0.0045785825,0.0002798005,0.0014333854,0.018184869,0.1204108,0.011204537,0.09075076,0.0036947075,0.60535187],"study_design_scores_gemma":[0.00009936917,0.002663936,0.17535298,0.00768302,0.0008738568,0.001862297,0.076640725,0.4856451,0.031865973,0.062205713,0.15460059,0.0005063943],"about_ca_topic_score_codex":0.005724235,"about_ca_topic_score_gemma":0.0067830025,"teacher_disagreement_score":0.0147842895,"about_ca_system_score_codex":0.0028198843,"about_ca_system_score_gemma":0.0028181432,"threshold_uncertainty_score":0.07818776},"labels":[],"label_agreement":null},{"id":"W3118571087","doi":"10.1108/ci-05-2020-0081","title":"Tracking major resources for automated progress monitoring of construction activities: masonry work case","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Field (mathematics); Computer science; Data collection; Heuristics; Work (physics); Proof of concept; Systems engineering; Engineering; Construction engineering; Data mining; Mechanical engineering","score_opus":0.016623825842240727,"score_gpt":0.2540318101950187,"score_spread":0.23740798435277796,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118571087","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83128315,0.00022142973,0.15877038,0.0002813266,0.000029360266,0.00075015763,0.0002986513,0.0010431663,0.0073223608],"genre_scores_gemma":[0.8894292,0.00010422713,0.10809971,0.000023302373,0.000006138945,0.000155274,0.00015399602,0.00003106185,0.0019971507],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985543,0.00047340212,0.00008254323,0.00024909878,0.0005073132,0.00013335371],"domain_scores_gemma":[0.99811363,0.0007921922,0.00025093215,0.00040046868,0.00029493304,0.00014780225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014260353,0.00055180927,0.00031079416,0.0010048241,0.0007050044,0.00096046354,0.0012032017,0.0010790295,0.0016274513],"category_scores_gemma":[0.0022516074,0.0003090665,0.0003067919,0.0007529376,0.00074464176,0.00094374106,0.00083614606,0.00044860097,0.00056224613],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011865709,0.0030444642,0.1336014,0.001384722,0.00010647019,0.018806497,0.007972842,0.16154805,0.131083,0.01518437,0.0059223934,0.52015924],"study_design_scores_gemma":[0.00017800587,0.001604103,0.07260849,0.00034444276,0.00016904429,0.0057671294,0.006778381,0.7542472,0.12212995,0.004498571,0.031493247,0.0001814904],"about_ca_topic_score_codex":0.005746941,"about_ca_topic_score_gemma":0.012419181,"teacher_disagreement_score":0.005746941,"about_ca_system_score_codex":0.0010102913,"about_ca_system_score_gemma":0.0012757782,"threshold_uncertainty_score":0.011426985},"labels":[],"label_agreement":null},{"id":"W3118671466","doi":"","title":"The Financial Impact of Unmanned Aerial Vehicles on Construction Project Management","year":2017,"lang":"en","type":"article","venue":"URSCA Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"SAIT Polytechnic","funders":"","keywords":"Systems engineering; Engineering; Project management; Construction management; Construction engineering; Engineering management; Risk analysis (engineering); Process management; Computer science; Business; Civil engineering","score_opus":0.009982670753267397,"score_gpt":0.24345007051365677,"score_spread":0.23346739976038938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118671466","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96009773,0.0006992887,0.00089217606,0.001780946,0.000033486558,0.00007992882,0.00024622344,0.000011717002,0.03615854],"genre_scores_gemma":[0.9984829,0.00024344659,0.00044420786,0.000050108178,0.000013525009,0.000019230578,0.000046758283,0.0000021104784,0.0006976136],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9910027,0.0030867031,0.00036825475,0.00016963377,0.004532971,0.00083964283],"domain_scores_gemma":[0.9610304,0.018296357,0.010089127,0.00066315004,0.00780074,0.0021200706],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062437644,0.00022300732,0.00013484187,0.0021212434,0.0012145552,0.0021934311,0.00038000464,0.00032212219,0.0033352645],"category_scores_gemma":[0.027679259,0.0000986303,0.00012628501,0.0019430214,0.0012890877,0.001447038,0.0014315267,0.0004618008,0.00027411315],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035808512,0.00056070555,0.5369052,0.00044550747,0.00007464084,0.000934483,0.0054957643,0.0060009505,0.002441054,0.013670094,0.006114843,0.42699865],"study_design_scores_gemma":[0.000011056184,0.0008309725,0.93955004,0.00049984205,0.000043187792,0.0003974357,0.028131299,0.0054261093,0.0017389144,0.0031466433,0.020170564,0.00005400982],"about_ca_topic_score_codex":0.0052077547,"about_ca_topic_score_gemma":0.009771618,"teacher_disagreement_score":0.0062437644,"about_ca_system_score_codex":0.0037207187,"about_ca_system_score_gemma":0.0034890913,"threshold_uncertainty_score":0.033020556},"labels":[],"label_agreement":null},{"id":"W3118835968","doi":"10.1139/cjce-2020-0230","title":"Integrating 3D modeling, sustainability and cost estimating at the conceptual design stage of bridges","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Bridge (graph theory); Sustainability; Conceptual design; Conceptual model; Systems engineering; Computer science; Process (computing); Footprint; Interoperability; Engineering; Conceptual framework; Software engineering; Database","score_opus":0.01363741765953633,"score_gpt":0.2053487243678734,"score_spread":0.19171130670833708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118835968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029864538,0.00017614878,0.95418924,0.00023432531,0.000025522239,0.00018485833,0.0005101048,0.0013889375,0.013426318],"genre_scores_gemma":[0.40162617,0.00075909996,0.59089667,0.00009502157,0.00001746104,0.00038318863,0.001020382,0.00042700884,0.004775038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986456,0.00029748888,0.000080294085,0.00012253829,0.0007797626,0.00007440259],"domain_scores_gemma":[0.9987004,0.00042736757,0.000115501316,0.00027419857,0.00044921497,0.000033305107],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018884805,0.0011088834,0.00061620935,0.0026571557,0.0004696522,0.003134648,0.0015119129,0.0013266817,0.0033251652],"category_scores_gemma":[0.0036252595,0.0009678201,0.0011864246,0.0013829838,0.0005804661,0.002229045,0.0016972658,0.00066544925,0.0010485906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028460592,0.000055787637,0.0032977737,0.00015279539,0.000039557206,0.00014811484,0.00024646067,0.8376643,0.006847393,0.018431257,0.0016751557,0.13141298],"study_design_scores_gemma":[0.000010220383,0.000052290117,0.0025094363,0.00007199202,0.00004549791,0.0001429893,0.00013433446,0.96662146,0.006507307,0.008609665,0.015226418,0.00006834658],"about_ca_topic_score_codex":0.0147704035,"about_ca_topic_score_gemma":0.019518558,"teacher_disagreement_score":0.0147704035,"about_ca_system_score_codex":0.0019043032,"about_ca_system_score_gemma":0.0023364795,"threshold_uncertainty_score":0.029368818},"labels":[],"label_agreement":null},{"id":"W3118889388","doi":"","title":"Construction data preparation framework using fuzzy approach","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Fuzzy logic; Data mining; Artificial intelligence","score_opus":0.07756464800044906,"score_gpt":0.2624573120774001,"score_spread":0.18489266407695104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3118889388","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020986996,0.000055237466,0.99507046,0.000055586665,0.000011100572,0.000055691828,0.00011289288,0.00045818588,0.0020821297],"genre_scores_gemma":[0.09342962,0.0001663346,0.9032408,0.00003621091,0.000014494873,0.00015540299,0.0006741485,0.00008434365,0.002198604],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856514,0.00023777889,0.00011613798,0.00024439272,0.00071516965,0.000121316145],"domain_scores_gemma":[0.9992493,0.00014824711,0.000042462292,0.0001222918,0.0003946141,0.000043137064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001964341,0.0006350209,0.0006577643,0.0032943333,0.0013298696,0.0024669783,0.0019875944,0.00079604465,0.0039259363],"category_scores_gemma":[0.0022119514,0.0005099343,0.0014676158,0.0024278644,0.00074701145,0.0024986903,0.0016419447,0.0008856543,0.0010530811],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012711319,0.00020634613,0.002395523,0.00045694248,0.00014075544,0.00046556778,0.00092455914,0.12940149,0.013353912,0.3988224,0.009190759,0.44451472],"study_design_scores_gemma":[0.000027746095,0.00008263468,0.0014234044,0.00015561708,0.00014135678,0.0003754231,0.0006693575,0.77603835,0.017528152,0.14964657,0.053812712,0.000098688855],"about_ca_topic_score_codex":0.011594979,"about_ca_topic_score_gemma":0.012299263,"teacher_disagreement_score":0.011594979,"about_ca_system_score_codex":0.001149772,"about_ca_system_score_gemma":0.0026429987,"threshold_uncertainty_score":0.023054957},"labels":[],"label_agreement":null},{"id":"W3119149896","doi":"","title":"Comparative study of life-cycle costing for sustainable infrastructure rehabilitation using Markov Decision Process and directed genetic algorithms","year":2008,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Markov decision process; Activity-based costing; Process (computing); Computer science; Genetic algorithm; Life cycle costing; Markov chain; Markov process; Operations research; Algorithm; Operations management; Machine learning; Engineering; Business; Mathematics; Statistics","score_opus":0.009865473563501977,"score_gpt":0.25762550499077963,"score_spread":0.24776003142727765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119149896","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6358956,0.00062978035,0.34934804,0.00035480663,0.00004702758,0.00015508295,0.0001302428,0.00019577211,0.013243756],"genre_scores_gemma":[0.9679892,0.0001241096,0.030891174,0.000016324117,0.00000394751,0.000051643707,0.000050470866,0.000020374382,0.000852735],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993894,0.0003384858,0.000019336885,0.000042927728,0.00013929198,0.0000706387],"domain_scores_gemma":[0.99591833,0.0035445916,0.00010765423,0.00007312543,0.00029414598,0.00006213092],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024802457,0.00037566468,0.0007214239,0.0015953523,0.00045579684,0.0008148511,0.0008135007,0.0008409988,0.0017062561],"category_scores_gemma":[0.005470097,0.00029851575,0.00064513413,0.0014299789,0.0003926256,0.0009767988,0.00037023306,0.00044820085,0.00007828919],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055280227,0.000051268078,0.0005680493,0.000018081239,0.000013305214,0.000007847614,0.000015345173,0.98301375,0.00017600015,0.0043194126,0.00007408508,0.011687617],"study_design_scores_gemma":[0.000006471215,0.000025478597,0.00028136245,0.0000029355274,0.0000095257965,0.0000030365081,0.000010440651,0.99807286,0.00016950964,0.001341987,0.000073600204,0.000002793012],"about_ca_topic_score_codex":0.024859656,"about_ca_topic_score_gemma":0.01674472,"teacher_disagreement_score":0.024859656,"about_ca_system_score_codex":0.0027393964,"about_ca_system_score_gemma":0.0023952618,"threshold_uncertainty_score":0.049429953},"labels":[],"label_agreement":null},{"id":"W3119469403","doi":"","title":"Constructability assessment framework using BIM technology","year":2009,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Constructability; Construction engineering; Engineering; Computer science; Systems engineering; Forensic engineering","score_opus":0.008873200495029942,"score_gpt":0.26274492559071,"score_spread":0.25387172509568007,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119469403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006322802,0.0001217062,0.98327404,0.00016749036,0.000013069022,0.00010624599,0.00006756769,0.00021564763,0.009711467],"genre_scores_gemma":[0.30305168,0.00027277414,0.6911182,0.000060742284,0.00002681086,0.00039167274,0.0003459296,0.000064655374,0.0046675126],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9958513,0.00088084216,0.0003267575,0.0004331136,0.0022734154,0.00023463008],"domain_scores_gemma":[0.9977975,0.00062047265,0.00021324072,0.00020592862,0.0010409559,0.000121912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035262455,0.001171048,0.0006580543,0.006748729,0.0012030837,0.0038584652,0.0019856573,0.0010590224,0.0030780903],"category_scores_gemma":[0.0051303445,0.0004744853,0.0011524984,0.0022779221,0.0019438594,0.0038596678,0.0022789347,0.0011646771,0.00067862595],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000041331015,0.00019145984,0.0039442247,0.00024463132,0.00010670603,0.0002822669,0.0008407803,0.06544869,0.005850793,0.7490158,0.0022994678,0.17173381],"study_design_scores_gemma":[0.000025214438,0.00015356709,0.0046142456,0.00026177755,0.00017549715,0.00042495556,0.0015289057,0.45131624,0.008021964,0.50615084,0.027230563,0.000096247306],"about_ca_topic_score_codex":0.007843604,"about_ca_topic_score_gemma":0.0068818904,"teacher_disagreement_score":0.007843604,"about_ca_system_score_codex":0.0019023691,"about_ca_system_score_gemma":0.0025990028,"threshold_uncertainty_score":0.018648744},"labels":[],"label_agreement":null},{"id":"W3119677942","doi":"","title":"An evaluation of architects' readiness for conducting energy modelling using BIM tools to achieve high energy performance buildings in the UK and Canada","year":2020,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Architectural engineering; Energy consumption; Engineering; Process (computing); Building design; Zero-energy building; Efficient energy use; Work (physics); Energy (signal processing); Engineering design process; Civil engineering; Computer science; Mechanical engineering","score_opus":0.04846247594753966,"score_gpt":0.25756853283578623,"score_spread":0.20910605688824657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119677942","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97914106,0.0001384778,0.0012309701,0.0014932259,0.000029853367,0.00022539523,0.00020488638,0.00008553781,0.017450638],"genre_scores_gemma":[0.99360704,0.0002470227,0.0031776973,0.00011408132,0.000003026562,0.00005762633,0.00012388229,0.00002597987,0.002643446],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.97919524,0.0050797043,0.0011390183,0.0007961627,0.01184934,0.0019405663],"domain_scores_gemma":[0.93050504,0.01153866,0.0032077676,0.0021786809,0.04761294,0.0049570166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02159683,0.00043027478,0.00027798748,0.0017363292,0.00532926,0.0056247255,0.001579485,0.0008472226,0.0028796648],"category_scores_gemma":[0.048688818,0.00052271836,0.0005849888,0.0021107623,0.0032263845,0.0013387449,0.0024610339,0.0011703672,0.00062831887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018845886,0.0008524073,0.5789065,0.0009953157,0.00011602571,0.0024027883,0.16885996,0.01753903,0.012531519,0.011294361,0.017156929,0.18746057],"study_design_scores_gemma":[0.00007497091,0.0010799832,0.6457008,0.00062183215,0.00011551846,0.0004483314,0.25790966,0.020699017,0.0061049005,0.00061666715,0.06617794,0.00045036807],"about_ca_topic_score_codex":0.8809443,"about_ca_topic_score_gemma":0.9398072,"teacher_disagreement_score":0.11905569,"about_ca_system_score_codex":0.041889377,"about_ca_system_score_gemma":0.053835098,"threshold_uncertainty_score":0.3039301},"labels":[],"label_agreement":null},{"id":"W3119776155","doi":"","title":"Construction space simulation application-CSSA","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Space (punctuation); Computer science","score_opus":0.0032482734114195775,"score_gpt":0.18685785630137144,"score_spread":0.18360958288995186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119776155","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03799577,0.000069842026,0.81415755,0.00024173512,0.00020914806,0.00026192772,0.0053431243,0.07344433,0.06827657],"genre_scores_gemma":[0.46163863,0.0003028667,0.47976908,0.00020754531,0.00006761615,0.0007572087,0.010408259,0.00831497,0.03853378],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978596,0.000035372894,0.000013664428,0.00003065859,0.00011670602,0.00001763623],"domain_scores_gemma":[0.99965036,0.00007497751,0.000012130162,0.00009125054,0.00013921785,0.00003205524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039724773,0.0006463853,0.00061084726,0.0006145908,0.00053577725,0.00091686693,0.001102253,0.00063724193,0.029427052],"category_scores_gemma":[0.0010026959,0.0004742913,0.0007852172,0.0006906281,0.00031957022,0.00066871254,0.0011075452,0.0005925865,0.007639166],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000665569,0.00057334336,0.008624289,0.00069983036,0.00021874216,0.0008606336,0.0007296608,0.43615693,0.05975306,0.07372252,0.086347006,0.33164844],"study_design_scores_gemma":[0.0001397472,0.00005615474,0.0017191699,0.000058337024,0.00004910339,0.00024520035,0.000098865465,0.81442505,0.03262869,0.011507533,0.13902266,0.000049542297],"about_ca_topic_score_codex":0.005813871,"about_ca_topic_score_gemma":0.0058757267,"teacher_disagreement_score":0.029427052,"about_ca_system_score_codex":0.00041779203,"about_ca_system_score_gemma":0.0008403767,"threshold_uncertainty_score":0.09844327},"labels":[],"label_agreement":null},{"id":"W3119926992","doi":"","title":"Synthèse comparative des Méthodes d’évaluation de la vulnérabilité sismique des bâtiments","year":2020,"lang":"fr","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.07418289552947421,"score_gpt":0.3098975114119336,"score_spread":0.2357146158824594,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3119926992","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058546808,0.0058068703,0.8963324,0.0010586029,0.0006729779,0.002293091,0.0033901003,0.005470669,0.026428618],"genre_scores_gemma":[0.11782817,0.0026425952,0.86417216,0.0001885172,0.00007355076,0.002528967,0.0024608967,0.0010223379,0.009082817],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9745709,0.00995077,0.0028874653,0.0025198327,0.009658769,0.0004122692],"domain_scores_gemma":[0.90370566,0.055679545,0.005009686,0.006120355,0.028927349,0.0005574512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019055258,0.0019354019,0.0012937258,0.0066869226,0.0010950493,0.006455432,0.0018284086,0.001421925,0.01673203],"category_scores_gemma":[0.08155592,0.0009827965,0.0023335912,0.004327689,0.0016201392,0.0041310596,0.0021459218,0.0016898601,0.00345504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011566932,0.00029986817,0.01581653,0.011397757,0.00082369946,0.00029956407,0.012166752,0.015943216,0.029520173,0.0355857,0.012596594,0.8643934],"study_design_scores_gemma":[0.0006491858,0.0033316207,0.07360371,0.016365979,0.0022343523,0.002083122,0.023995591,0.14759512,0.16034587,0.04292415,0.5255055,0.001365851],"about_ca_topic_score_codex":0.009467429,"about_ca_topic_score_gemma":0.011188556,"teacher_disagreement_score":0.019055258,"about_ca_system_score_codex":0.002602022,"about_ca_system_score_gemma":0.005511148,"threshold_uncertainty_score":0.10077506},"labels":[],"label_agreement":null},{"id":"W3120006218","doi":"10.1016/j.jobe.2021.102159","title":"The dynamic evolution of synergies between BIM and sustainability: A text mining and network theory approach","year":2021,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":42,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sustainability; Building information modeling; Certification; Computer science; Social sustainability; Knowledge management; Process management; Engineering; Business; Operations management; Management; Economics","score_opus":0.0032260887627596204,"score_gpt":0.1915197053558742,"score_spread":0.18829361659311458,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120006218","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8100884,0.0012575145,0.15527411,0.0033002761,0.000094707466,0.00021544333,0.0060013146,0.00039660707,0.023371624],"genre_scores_gemma":[0.9545428,0.00036565543,0.0419802,0.000052998646,0.00004344426,0.000078391786,0.0013723822,0.00004280565,0.0015213328],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9991208,0.00028809503,0.00008062825,0.00020296847,0.00025221801,0.000055239754],"domain_scores_gemma":[0.9847637,0.012554807,0.0011670286,0.00039819,0.0009579394,0.00015836835],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0017224154,0.0003093262,0.0003076545,0.0067183864,0.0006119577,0.002314134,0.00068143144,0.0006329501,0.0034325258],"category_scores_gemma":[0.01540188,0.00026798926,0.00049167615,0.0065219924,0.00068994414,0.005951633,0.0009496663,0.0007310591,0.0005467888],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059829996,0.0006236007,0.2711289,0.0009576242,0.0004942392,0.0013943111,0.0060172495,0.09727273,0.009945805,0.10548947,0.01030636,0.49577147],"study_design_scores_gemma":[0.000028823213,0.00010448074,0.12892734,0.0002678416,0.00025576618,0.00040976223,0.0040316544,0.73059493,0.0038276853,0.116227604,0.015257124,0.000066954526],"about_ca_topic_score_codex":0.0067046923,"about_ca_topic_score_gemma":0.009042134,"teacher_disagreement_score":0.9932816,"about_ca_system_score_codex":0.0011484786,"about_ca_system_score_gemma":0.0008804724,"threshold_uncertainty_score":0.013331354},"labels":[],"label_agreement":null},{"id":"W3120018482","doi":"10.1108/ohi-01-2013-b0003","title":"A Computer-Based System for Mass Customization of Prefabricated Housing","year":2013,"lang":"en","type":"article","venue":"Open House International","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Mass customization; Housing industry; Architectural engineering; Prefabrication; Globe; Personalization; Engineering; Business; Modularity (biology); Marketing; Telecommunications; Civil engineering","score_opus":0.01368458525468981,"score_gpt":0.22610366295886314,"score_spread":0.21241907770417334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120018482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061000727,0.00020977491,0.77008015,0.00020346785,0.00009422134,0.0012138854,0.0010568701,0.14261256,0.02352835],"genre_scores_gemma":[0.6548038,0.0003327347,0.30971807,0.00021344832,0.000047925605,0.0008193305,0.0024217505,0.0024852562,0.029157663],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992593,0.00009887463,0.000066029104,0.00017761793,0.00032201278,0.00007619323],"domain_scores_gemma":[0.99875975,0.00028112627,0.00008788069,0.00043115544,0.00031127397,0.00012885698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011031344,0.00078430196,0.00059414207,0.001426372,0.0006189175,0.0014562933,0.0016063773,0.0007756563,0.013701613],"category_scores_gemma":[0.0021577752,0.00032779016,0.00032893592,0.00092498865,0.0005968567,0.0011624055,0.0019093417,0.0006865479,0.003041348],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017136815,0.00081475434,0.011819172,0.00042500556,0.00012880238,0.0016354818,0.002768729,0.030078536,0.1205901,0.017477077,0.036324285,0.7762244],"study_design_scores_gemma":[0.00033980256,0.00088260294,0.026073817,0.00026823257,0.00018117565,0.0022052187,0.0007124874,0.54910284,0.13648249,0.009952933,0.27340117,0.00039721257],"about_ca_topic_score_codex":0.009691914,"about_ca_topic_score_gemma":0.008631973,"teacher_disagreement_score":0.013701613,"about_ca_system_score_codex":0.0009715007,"about_ca_system_score_gemma":0.0009824,"threshold_uncertainty_score":0.04583645},"labels":[],"label_agreement":null},{"id":"W3120180031","doi":"","title":"Enhancing construction claims analysis using computer simulation","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science","score_opus":0.008542091541658109,"score_gpt":0.21440711842962362,"score_spread":0.2058650268879655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120180031","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19264051,0.000049692608,0.7875779,0.00024944908,0.00003986685,0.00013931282,0.00011627307,0.0021415874,0.017045466],"genre_scores_gemma":[0.83005154,0.00004953859,0.16793041,0.00002702637,0.0000072414623,0.00005699851,0.00013139014,0.00012832863,0.0016175396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989104,0.00042195898,0.000055558554,0.000101196005,0.00043817415,0.0000725535],"domain_scores_gemma":[0.9942597,0.004207927,0.00019054177,0.00053014705,0.0007376266,0.00007405668],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018432671,0.00068447134,0.00064328173,0.0015928638,0.00060394045,0.0021391038,0.0010701035,0.0010534909,0.007393409],"category_scores_gemma":[0.008872709,0.0004089774,0.000556148,0.00094005355,0.0005891852,0.0019350437,0.0015069792,0.0007431021,0.0007070198],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003940212,0.00067348836,0.0050506573,0.0001536482,0.000059499427,0.00018200174,0.0007617437,0.80947244,0.017293029,0.02993412,0.0013413889,0.13468401],"study_design_scores_gemma":[0.00000803341,0.000022598,0.00019089016,0.0000056739327,0.000006480873,0.000019000374,0.00006169344,0.9929998,0.0026479876,0.0034384585,0.00059437816,0.0000050019685],"about_ca_topic_score_codex":0.005833356,"about_ca_topic_score_gemma":0.005836158,"teacher_disagreement_score":0.007393409,"about_ca_system_score_codex":0.00094511785,"about_ca_system_score_gemma":0.0014734735,"threshold_uncertainty_score":0.024733424},"labels":[],"label_agreement":null},{"id":"W3120476599","doi":"10.29173/mocs162","title":"Implementation of Prefabrication and Modular Offsite Construction using BIM and Lean Construction Techniques","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Modular design; Lean construction; Engineering; Construction management; Schedule; Construction engineering; Productivity; Construction waste; Building information modeling; Construction industry; Architectural engineering; Transport engineering; Operations management; Civil engineering; Computer science; Waste management","score_opus":0.01466718059163039,"score_gpt":0.23346497834709798,"score_spread":0.2187977977554676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120476599","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35687584,0.00083979627,0.5245908,0.002412656,0.000067371235,0.0032058826,0.00008269089,0.0003991319,0.11152585],"genre_scores_gemma":[0.5404357,0.0006797286,0.45256868,0.00021311238,0.000011588337,0.00064933865,0.00013825191,0.000040661456,0.0052630026],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9816914,0.010354066,0.00075973466,0.0006146053,0.005462718,0.0011175522],"domain_scores_gemma":[0.99254805,0.0029809095,0.00088564685,0.0012557162,0.0019714292,0.00035830305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016911099,0.00081998407,0.0003825502,0.0024497362,0.0016656893,0.0024762165,0.0018390784,0.0010589729,0.0014827895],"category_scores_gemma":[0.010422419,0.00041614703,0.00073672127,0.0015878894,0.0022227776,0.0036747847,0.0043410854,0.001437277,0.00033588204],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010460618,0.0011307622,0.0128848,0.0012704701,0.000042165997,0.00093316927,0.027879799,0.021855038,0.021686768,0.06831826,0.0023418635,0.8415523],"study_design_scores_gemma":[0.00016536175,0.0071176942,0.10870257,0.0074314964,0.00016863746,0.005973471,0.13090475,0.11890548,0.07969602,0.12392358,0.41653025,0.0004807201],"about_ca_topic_score_codex":0.0027018867,"about_ca_topic_score_gemma":0.007475368,"teacher_disagreement_score":0.016911099,"about_ca_system_score_codex":0.0031378907,"about_ca_system_score_gemma":0.01016637,"threshold_uncertainty_score":0.08943552},"labels":[],"label_agreement":null},{"id":"W3120988520","doi":"","title":"Agent-based modeling and simulation of earthmoving operations","year":2015,"lang":"en","type":"article","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Task (project management); Engineering; Constraint (computer-aided design); Set (abstract data type); Resource (disambiguation); Representation (politics); Truck; Industrial engineering; Computer science; Simulation; Systems engineering","score_opus":0.04116181705861633,"score_gpt":0.26121885866326977,"score_spread":0.22005704160465345,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3120988520","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055256315,0.000699242,0.8999759,0.00070982723,0.00013721958,0.00020200116,0.0005065631,0.0006222442,0.041890576],"genre_scores_gemma":[0.8168867,0.0020549651,0.1589312,0.00012171946,0.000058592534,0.0005085491,0.00062039605,0.00011617521,0.020701628],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999647,0.0001268192,0.000025986928,0.000056490335,0.00010060585,0.000043153985],"domain_scores_gemma":[0.9996562,0.00016389003,0.000049830094,0.000032479158,0.00006196028,0.000035687674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047220293,0.00048463422,0.0005700057,0.000523728,0.0005679257,0.0018892967,0.0012713319,0.0012347791,0.0029130091],"category_scores_gemma":[0.0010151999,0.0003530254,0.00079857995,0.0006386866,0.00071339554,0.001213819,0.0011786132,0.0010234349,0.00041218958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008554579,0.0000115641715,0.00033683973,0.000020977068,0.0000114267095,0.00005034964,0.000039798975,0.96796286,0.0003822912,0.027856583,0.0003046787,0.003014046],"study_design_scores_gemma":[0.0000063627604,0.000008727895,0.0001073931,0.00000769122,0.0000051627944,0.000010241155,0.000018691386,0.9903949,0.00016826933,0.0065273084,0.0027401124,0.000005169366],"about_ca_topic_score_codex":0.015099196,"about_ca_topic_score_gemma":0.007954876,"teacher_disagreement_score":0.015099196,"about_ca_system_score_codex":0.0009768802,"about_ca_system_score_gemma":0.0015882401,"threshold_uncertainty_score":0.030022621},"labels":[],"label_agreement":null},{"id":"W3121023415","doi":"","title":"A comparison of des and SD for simulating construction operation","year":2013,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Mathematics","score_opus":0.02152620729274591,"score_gpt":0.2680055662489356,"score_spread":0.24647935895618972,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121023415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5878599,0.00030591796,0.37728873,0.00022787625,0.00022206607,0.00014471538,0.001303066,0.0038980015,0.028749697],"genre_scores_gemma":[0.9339657,0.000114084454,0.063197486,0.000030381854,0.000007841332,0.00004643601,0.00049690576,0.00018859786,0.0019525611],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996865,0.00009351796,0.000022075219,0.00005111335,0.00011527307,0.000031638607],"domain_scores_gemma":[0.9982992,0.00094111124,0.000049761406,0.00022209506,0.00042305505,0.00006481464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071707653,0.00048185157,0.0005974797,0.00062903157,0.0002814466,0.0006522251,0.0008484562,0.0006062883,0.004966235],"category_scores_gemma":[0.0030565246,0.00025689055,0.0003919766,0.00074523175,0.00030796204,0.000686521,0.00041258158,0.00043775776,0.0005333165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00052150287,0.00017259017,0.004800479,0.00016615335,0.000045132587,0.000046601283,0.00009973789,0.92554075,0.0072453097,0.004850434,0.0007233062,0.055788066],"study_design_scores_gemma":[0.0000102981985,0.00005451499,0.00039188593,0.0000044290987,0.000006547644,0.000010246346,0.000033487428,0.9949715,0.003261925,0.00037095972,0.00087913795,0.0000049862697],"about_ca_topic_score_codex":0.013471748,"about_ca_topic_score_gemma":0.012996308,"teacher_disagreement_score":0.013471748,"about_ca_system_score_codex":0.0006600268,"about_ca_system_score_gemma":0.00080581754,"threshold_uncertainty_score":0.026786685},"labels":[],"label_agreement":null},{"id":"W3121749086","doi":"10.29173/mocs241","title":"Front matter, 2015 MOC Summit proceedings","year":2015,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Summit; Front (military); Modular design; Political science; Engineering; Computer science; Geography; Operating system; Physical geography; Mechanical engineering","score_opus":0.009094887801055232,"score_gpt":0.20975921333359598,"score_spread":0.20066432553254077,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3121749086","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012424985,0.0015830301,0.00054092245,0.00977031,0.0094113685,0.000071209695,0.0032474622,0.0004609161,0.9736723],"genre_scores_gemma":[0.0040208073,0.00088391267,0.00030071064,0.0007344054,0.00078819896,0.000030027975,0.0019276671,0.00014179891,0.9911725],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991854,0.000044596498,0.000025678899,0.000078660494,0.0005595118,0.00010614666],"domain_scores_gemma":[0.99827063,0.00009808236,0.000045856174,0.0000792137,0.00092884083,0.00057742],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00090966246,0.0006249707,0.00035428567,0.0017493456,0.0023655635,0.0055614477,0.00084341434,0.0017708171,0.547028],"category_scores_gemma":[0.0028777542,0.00017069903,0.00025109103,0.0011095433,0.0008011746,0.0016539855,0.002504198,0.0013463713,0.34065214],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001572649,0.000018809778,0.0001191591,0.000050895254,8.9636444e-7,0.000030715742,0.000031927928,0.000035653382,0.00008260327,0.0016606032,0.96317977,0.03477322],"study_design_scores_gemma":[0.0000022251625,0.0000045881116,0.0005059525,0.00006997119,7.2662476e-7,0.000011361533,0.000072183706,0.00003889977,0.000083332416,0.0005064268,0.9987017,0.0000026152666],"about_ca_topic_score_codex":0.022204723,"about_ca_topic_score_gemma":0.10274546,"teacher_disagreement_score":0.452972,"about_ca_system_score_codex":0.0032301315,"about_ca_system_score_gemma":0.004356508,"threshold_uncertainty_score":0.6461096},"labels":[],"label_agreement":null},{"id":"W3122925454","doi":"10.29173/ijic236","title":"Combined Application of 4D BIM Schedule and an Immersive Virtual Reality on a Modular Project: UNLV Solar Decathlon Case","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Nevada, Las Vegas","keywords":"Schedule; Virtual reality; Modular design; Computer science; Plan (archaeology); Systems engineering; Engineering management; Construction engineering; Human–computer interaction; Engineering; Operating system","score_opus":0.023343636918016084,"score_gpt":0.288660164596957,"score_spread":0.26531652767894087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3122925454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96102405,0.000060948423,0.019608716,0.00025124438,0.000021553273,0.00017527644,0.000032226944,0.000088693894,0.018737325],"genre_scores_gemma":[0.96944267,0.00012525433,0.024359664,0.000027471595,0.0000063400817,0.00010800174,0.000033218545,0.000021433396,0.00587586],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986236,0.0006781074,0.000050296327,0.00011007677,0.00034341187,0.00019448104],"domain_scores_gemma":[0.9991831,0.00031314362,0.00010165607,0.00013586177,0.00011072548,0.00015546147],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012159571,0.00046817586,0.00020421385,0.00079995516,0.00081765617,0.0008695401,0.000883109,0.00077737455,0.0029722913],"category_scores_gemma":[0.0021071055,0.00028073884,0.00037411947,0.0005059931,0.0012096178,0.00074564724,0.0017387121,0.0004860844,0.00039098982],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009593723,0.0039856415,0.078773625,0.0011299168,0.00010713493,0.13978866,0.14317314,0.048981853,0.09588842,0.035563353,0.0067380425,0.44491088],"study_design_scores_gemma":[0.0004043284,0.010570626,0.18980117,0.00081889867,0.00032548228,0.09041192,0.2163809,0.20751818,0.09651339,0.010031842,0.17664698,0.00057624513],"about_ca_topic_score_codex":0.0042557265,"about_ca_topic_score_gemma":0.009307954,"teacher_disagreement_score":0.0042557265,"about_ca_system_score_codex":0.000678279,"about_ca_system_score_gemma":0.0009671753,"threshold_uncertainty_score":0.009943366},"labels":[],"label_agreement":null},{"id":"W3123138904","doi":"10.1155/2021/8833058","title":"Digital Twins and Road Construction Using Secondary Raw Materials","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":66,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Horizon 2020 Framework Programme; European Commission","keywords":"Demolition; Raw material; Construction engineering; Work (physics); Road construction; Parallels; Engineering; Civil engineering; Computer science; Transport engineering; Operations management; Mechanical engineering","score_opus":0.005829596639802246,"score_gpt":0.20940272963017922,"score_spread":0.20357313299037696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3123138904","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4792771,0.00026141858,0.4423817,0.00036156017,0.00006585617,0.0004539121,0.0005157703,0.0010957951,0.07558682],"genre_scores_gemma":[0.8558717,0.0001486864,0.13432032,0.000029735436,0.00000792813,0.00008353988,0.00032859136,0.00008829143,0.009121237],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99842656,0.00036894597,0.00010515978,0.00027952224,0.00064921804,0.00017046505],"domain_scores_gemma":[0.99868554,0.00026639382,0.00014954331,0.0005333806,0.00024663116,0.00011848151],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014460145,0.00039269993,0.00024216127,0.001627349,0.00082746235,0.002364208,0.0009603593,0.0007524007,0.0035855288],"category_scores_gemma":[0.0028157707,0.0003062676,0.000503037,0.0017369434,0.0019023601,0.0043117166,0.0040675043,0.0006324038,0.0008000859],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038135468,0.00033731599,0.040231116,0.0006535403,0.0000608462,0.0032361804,0.009208331,0.045837313,0.054224804,0.42642045,0.0032768406,0.41613188],"study_design_scores_gemma":[0.000048959348,0.0014642114,0.04576094,0.00049865677,0.00017595345,0.008054014,0.013862406,0.21693389,0.19898604,0.106920816,0.4070522,0.00024196345],"about_ca_topic_score_codex":0.002565916,"about_ca_topic_score_gemma":0.004058736,"teacher_disagreement_score":0.0035855288,"about_ca_system_score_codex":0.0010451991,"about_ca_system_score_gemma":0.001331187,"threshold_uncertainty_score":0.011994779},"labels":[],"label_agreement":null},{"id":"W3124916602","doi":"10.1007/s11831-021-09545-2","title":"Integration of BIM and GIS for Construction Automation, a Systematic Literature Review (SLR) Combining Bibliometric and Qualitative Analysis","year":2021,"lang":"en","type":"article","venue":"Archives of Computational Methods in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":71,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Automation; Computer science; Systems engineering; Geographic information system; Robot; Construction engineering; Data science; Engineering management; Engineering; Artificial intelligence; Operations management; Remote sensing","score_opus":0.020745270271691228,"score_gpt":0.3570799097212898,"score_spread":0.33633463944959857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3124916602","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025611367,0.945473,0.010400559,0.003111077,0.0005569851,0.0029692715,0.0049514603,0.00008946001,0.006836864],"genre_scores_gemma":[0.21376331,0.7276336,0.045798175,0.0021987355,0.0003565333,0.004880755,0.0040692827,0.000052061907,0.0012475819],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9596836,0.017772444,0.010474217,0.0017343424,0.009792986,0.00054241996],"domain_scores_gemma":[0.9063176,0.06719422,0.009391946,0.0026087072,0.013891806,0.00059583265],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.04174751,0.0011361873,0.0034602042,0.09154178,0.0015128222,0.0053725024,0.0016383007,0.0013834198,0.0032847668],"category_scores_gemma":[0.09686887,0.0008813349,0.002978728,0.048872203,0.001531288,0.005393557,0.0032055276,0.00085362146,0.00045868856],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018955076,0.00014236027,0.011606659,0.6456772,0.0047953213,0.00042742142,0.0035155094,0.00080593,0.0021236658,0.006101421,0.0049174707,0.31969738],"study_design_scores_gemma":[0.00011681103,0.0006185149,0.032037485,0.74486506,0.032621525,0.0012816788,0.012917903,0.0015623748,0.0034527052,0.0063091493,0.16404046,0.00017637873],"about_ca_topic_score_codex":0.0077040703,"about_ca_topic_score_gemma":0.028892279,"teacher_disagreement_score":0.90845823,"about_ca_system_score_codex":0.0054061026,"about_ca_system_score_gemma":0.0390674,"threshold_uncertainty_score":0.2207846},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"systematic_review","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"systematic_review","genre":"review","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"agree"},{"id":"W3125454972","doi":"10.14488/bjopm.2021.007","title":"A Multi-Objective Scheduling Algorithm for Multi-Mode Resource Constrained Projects in the Presence of Uncertain Resource Availability","year":2021,"lang":"en","type":"article","venue":"Brazilian Journal of Operations & Production Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Scheduling (production processes); Schedule; Fair-share scheduling; Dynamic priority scheduling; Genetic algorithm scheduling; Mathematical optimization; Job shop scheduling; Heuristic; Rate-monotonic scheduling; Operations research; Industrial engineering; Engineering; Mathematics; Artificial intelligence","score_opus":0.027289861930830592,"score_gpt":0.28336254524699805,"score_spread":0.25607268331616745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125454972","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020609308,0.00035692414,0.9743825,0.00018254516,0.00006306691,0.00015455339,0.00007636688,0.00038199432,0.0037927148],"genre_scores_gemma":[0.3604282,0.00033929438,0.6343427,0.00011677385,0.000051380423,0.00058986765,0.00026059846,0.00010260353,0.0037686077],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956113,0.00013783999,0.00002590433,0.000096508214,0.000102438855,0.000076151584],"domain_scores_gemma":[0.9994629,0.00027547276,0.00008164023,0.000018928442,0.00012335704,0.00003781519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011387386,0.0010583395,0.0011714095,0.00095579843,0.0007217151,0.00096622115,0.0012906085,0.0014172898,0.0031738442],"category_scores_gemma":[0.0013954192,0.00063170894,0.001013223,0.0008713786,0.00040448824,0.0007396565,0.00082297507,0.0011084408,0.00038209333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052618867,0.00004146144,0.00039151715,0.000098041055,0.00003954445,0.000072179755,0.000055021123,0.9571809,0.0011271087,0.0023896543,0.00076386024,0.037788086],"study_design_scores_gemma":[0.000018938585,0.000032257336,0.000073792085,0.00001015205,0.0000080962745,0.000015647483,0.000013758351,0.9984585,0.00022114447,0.00068768114,0.0004558535,0.000004177573],"about_ca_topic_score_codex":0.0084852595,"about_ca_topic_score_gemma":0.006732182,"teacher_disagreement_score":0.0084852595,"about_ca_system_score_codex":0.00087097014,"about_ca_system_score_gemma":0.0025154147,"threshold_uncertainty_score":0.01687175},"labels":[],"label_agreement":null},{"id":"W3125617660","doi":"10.1108/jfm-08-2020-0055","title":"Integrating BIM into sensor-based facilities management operations","year":2021,"lang":"en","type":"article","venue":"Journal of Facilities Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":59,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Building information modeling; Facility management; Workflow; Computer science; Systems engineering; Building automation; Information model; Database; Engineering; Scheduling (production processes); Operations management","score_opus":0.010639114642672262,"score_gpt":0.212513856490712,"score_spread":0.20187474184803975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3125617660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03356459,0.00010765777,0.9436761,0.00027679023,0.000040282437,0.00028449757,0.0006351802,0.0045457687,0.016869167],"genre_scores_gemma":[0.47843808,0.00030797152,0.51524824,0.000060869566,0.000013713158,0.00031886637,0.0013508807,0.00037623092,0.0038851877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9991375,0.00019316265,0.000055420405,0.00012033016,0.00038167613,0.00011198476],"domain_scores_gemma":[0.99932945,0.00012943015,0.00008435283,0.00019209961,0.00019527013,0.0000694495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012527263,0.00065792544,0.0004716979,0.0010810178,0.0005499853,0.0020655685,0.0019027648,0.00056436664,0.0024687157],"category_scores_gemma":[0.001862143,0.000494467,0.0007762582,0.0011556387,0.0006810176,0.0023640785,0.001972547,0.00073562854,0.0008647417],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015482085,0.00027874002,0.0062452555,0.00042952772,0.00008009718,0.00045886674,0.0009663228,0.69779783,0.017094767,0.05851326,0.0048462288,0.21313432],"study_design_scores_gemma":[0.000028516462,0.00011922724,0.0032201242,0.00012085523,0.000047676363,0.00021580288,0.00059710204,0.91312766,0.018921444,0.019094631,0.04443182,0.00007515051],"about_ca_topic_score_codex":0.004003256,"about_ca_topic_score_gemma":0.0043864846,"teacher_disagreement_score":0.004003256,"about_ca_system_score_codex":0.0010320806,"about_ca_system_score_gemma":0.0019381155,"threshold_uncertainty_score":0.008258641},"labels":[],"label_agreement":null},{"id":"W3127370760","doi":"","title":"Transformer le secteur de la construction par le numérique : Un chantier ambitieux et nécessaire","year":2021,"lang":"fr","type":"preprint","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Humanities; Art","score_opus":0.00578896271993426,"score_gpt":0.21216906251094583,"score_spread":0.20638009979101157,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3127370760","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022991255,0.0005603331,0.9472564,0.00092370796,0.00021694617,0.0000429398,0.000096431926,0.00073947315,0.027172476],"genre_scores_gemma":[0.42023036,0.0025538788,0.47451258,0.0004716258,0.00046720283,0.000191966,0.0005487917,0.0018061032,0.09921746],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99800485,0.00043046035,0.00006718144,0.00039792398,0.0009729294,0.00012654955],"domain_scores_gemma":[0.9987565,0.0004962259,0.0000523757,0.0002650147,0.00032629867,0.00010348387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022712543,0.0015261605,0.0013496566,0.0015839956,0.0013202765,0.0049396493,0.0014086551,0.002142139,0.014607788],"category_scores_gemma":[0.0033680513,0.0009633556,0.0020747771,0.0013898165,0.0041255336,0.0056030503,0.0028772794,0.0047591235,0.0051934635],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023735303,0.000108960885,0.0009332086,0.00031486538,0.0000718054,0.00078549236,0.00074946205,0.046203554,0.037464257,0.8016693,0.0028083138,0.108653426],"study_design_scores_gemma":[0.00013850347,0.00021859983,0.0025505938,0.000232999,0.00008502157,0.0018884145,0.00075534993,0.2530097,0.046937887,0.56445384,0.12959753,0.00013142805],"about_ca_topic_score_codex":0.0069138496,"about_ca_topic_score_gemma":0.0052698306,"teacher_disagreement_score":0.014607788,"about_ca_system_score_codex":0.0023765767,"about_ca_system_score_gemma":0.0018006295,"threshold_uncertainty_score":0.04886794},"labels":[],"label_agreement":null},{"id":"W3128497859","doi":"10.46354/i3m.2019.mas.016","title":"An integrated simulation-based construction crew allocation and trade-off with energy and carbon footprint","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Crew; Environmental science; Carbon footprint; Energy consumption; Framing (construction); Environmental engineering; Engineering; Civil engineering","score_opus":0.004124298135839496,"score_gpt":0.18390281920555968,"score_spread":0.17977852106972017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128497859","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6002414,0.00019825643,0.3769367,0.00026683445,0.00003611747,0.00027425154,0.000310704,0.00067657395,0.021059098],"genre_scores_gemma":[0.97445405,0.000048485897,0.024034921,0.0000146744005,0.0000036027554,0.00008388661,0.00008746609,0.000027249167,0.001245793],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995684,0.00016412775,0.000012751131,0.000058829653,0.00009984659,0.000096037824],"domain_scores_gemma":[0.99944514,0.00027566418,0.000057055593,0.00004573105,0.000109263405,0.00006718421],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082253135,0.0006712519,0.00080136466,0.00066608307,0.00042753687,0.0013102569,0.0009867925,0.0008652572,0.0023779494],"category_scores_gemma":[0.0012399984,0.00052162807,0.0005660194,0.00076858513,0.0004780812,0.00085170433,0.0009795909,0.0005037419,0.00017140165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003931506,0.000044903958,0.00066859217,0.000007555225,0.000011165845,0.00001226596,0.00001087942,0.99534637,0.00051512703,0.0005548015,0.00004504477,0.0027438838],"study_design_scores_gemma":[0.0000072330786,0.000024785075,0.00025460424,0.0000016084035,0.000006441644,0.0000036480112,0.000011748712,0.9990779,0.00024488274,0.00024095472,0.00012307127,0.000002978951],"about_ca_topic_score_codex":0.023782922,"about_ca_topic_score_gemma":0.022033483,"teacher_disagreement_score":0.023782922,"about_ca_system_score_codex":0.0014888452,"about_ca_system_score_gemma":0.002238395,"threshold_uncertainty_score":0.047288954},"labels":[],"label_agreement":null},{"id":"W3128757296","doi":"10.1061/(asce)ae.1943-5568.0000459","title":"Application of Multiagent Simulation for Maintenance Workflow Management and Resource Allocation in Hospital Buildings","year":2021,"lang":"en","type":"article","venue":"Journal of Architectural Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workflow; Resource allocation; Process (computing); Computerized maintenance management system; Discrete event simulation; Preventive maintenance; Computer science; Component (thermodynamics); Predictive maintenance; Resource (disambiguation); Proactive maintenance; Process management; Operations research; Operations management; Risk analysis (engineering); Systems engineering; Engineering; Reliability engineering; Simulation; Business","score_opus":0.0036182559128587408,"score_gpt":0.19577046341580534,"score_spread":0.1921522075029466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128757296","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5000532,0.0005280871,0.48569006,0.0005900261,0.00010203369,0.00024890242,0.00026044264,0.0006701698,0.011857094],"genre_scores_gemma":[0.95136225,0.00020691204,0.046851795,0.000027431672,0.000009160697,0.00012742169,0.00010091429,0.000021843402,0.0012922942],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994228,0.00036938017,0.000027402595,0.000055787532,0.00006958004,0.000055073477],"domain_scores_gemma":[0.9987897,0.00083628745,0.000107233696,0.000061925355,0.00010414412,0.00010059619],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010203935,0.0005537307,0.00053917454,0.0005375084,0.0005937308,0.0011205241,0.0007543474,0.0010391062,0.0012515164],"category_scores_gemma":[0.0018031955,0.00036022175,0.00064832164,0.00051109196,0.00045347327,0.0005212933,0.00091004954,0.00059376983,0.000111173744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028625183,0.000029663885,0.00064832834,0.000012230533,0.000013213732,0.000033296896,0.000041784144,0.99539953,0.00034111014,0.0015350432,0.000049185037,0.0018679748],"study_design_scores_gemma":[0.0000060578154,0.000012593583,0.00011035838,0.0000025700797,0.0000039065935,0.0000035564744,0.000017756125,0.9990495,0.00016467125,0.00041909353,0.0002069409,0.0000029283794],"about_ca_topic_score_codex":0.016311787,"about_ca_topic_score_gemma":0.009254502,"teacher_disagreement_score":0.016311787,"about_ca_system_score_codex":0.0014432693,"about_ca_system_score_gemma":0.0016105974,"threshold_uncertainty_score":0.03243369},"labels":[],"label_agreement":null},{"id":"W3128993237","doi":"","title":"Cost management-based BIM: skills, implementation and teaching map","year":2021,"lang":"en","type":"book-chapter","venue":"BCU Open Access Repository (Birmingham City University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Building information modeling; Process (computing); Engineering management; Facility management; Engineering; Process management; Knowledge management; Computer science; Construction engineering; Systems engineering; Operations management; Business","score_opus":0.02954533593008739,"score_gpt":0.28162181703746947,"score_spread":0.25207648110738207,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3128993237","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016995948,0.0065378305,0.30803698,0.008276344,0.0009983667,0.00044578244,0.00037967268,0.0036568418,0.65467227],"genre_scores_gemma":[0.10689258,0.013783519,0.50204223,0.001290349,0.00041382274,0.00061418314,0.00091037137,0.0011558416,0.37289706],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999318,0.00016451268,0.0000207123,0.00006270903,0.0003861466,0.00004801194],"domain_scores_gemma":[0.99940264,0.00023797968,0.000024818728,0.00008950951,0.00015939852,0.00008568191],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012639831,0.0006069845,0.00028439888,0.0012423393,0.0006664565,0.0039334004,0.0015174948,0.0010166009,0.028590908],"category_scores_gemma":[0.0028635308,0.0004399595,0.00031038758,0.0016766335,0.00066224945,0.0038103973,0.0026300272,0.001721699,0.0108194845],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011585375,0.00021843746,0.00044766543,0.00027851586,0.0000035899268,0.00010823941,0.0021242765,0.0025292677,0.0016662166,0.07876489,0.06560694,0.8482404],"study_design_scores_gemma":[0.000008866871,0.000085129635,0.0016086966,0.0005246426,0.0000056995996,0.0005853841,0.0022017853,0.010289989,0.003558685,0.06815365,0.9129543,0.000023168177],"about_ca_topic_score_codex":0.0011409199,"about_ca_topic_score_gemma":0.0020977627,"teacher_disagreement_score":0.028590908,"about_ca_system_score_codex":0.0013727524,"about_ca_system_score_gemma":0.002007387,"threshold_uncertainty_score":0.09564614},"labels":[],"label_agreement":null},{"id":"W3129015247","doi":"10.1108/ci-05-2020-0068","title":"A hybrid simulation approach for microtunneling construction planning","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Plan (archaeology); Interdependence; Discrete event simulation; Process (computing); Computer science; Industrial engineering; Engineering; Operations research; Systems engineering; Simulation","score_opus":0.024398989342731554,"score_gpt":0.24914816127401412,"score_spread":0.22474917193128258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129015247","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034774058,0.00013102812,0.95351744,0.0001731788,0.000027881992,0.00010962228,0.00013074765,0.0004078837,0.01072822],"genre_scores_gemma":[0.758799,0.00033651272,0.23593196,0.00004849907,0.0000125666,0.00036235742,0.00021542472,0.00006944945,0.004224212],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957806,0.00019461384,0.000022987044,0.00005877347,0.00010847718,0.000037126512],"domain_scores_gemma":[0.99935263,0.00041266892,0.00005069579,0.00004870148,0.00009548373,0.0000398701],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000591703,0.00052732334,0.00049496547,0.0007235242,0.0004958601,0.0011763844,0.0009843572,0.00078952877,0.003594048],"category_scores_gemma":[0.0009066132,0.0003645925,0.00097611407,0.00069971883,0.00059663266,0.0008280492,0.0010150278,0.00067355955,0.0002764851],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022990725,0.000019965415,0.00049986015,0.000024029363,0.000018288423,0.00003915467,0.000054058182,0.9836353,0.0009096882,0.008166548,0.000097088196,0.0065130116],"study_design_scores_gemma":[0.000005881939,0.00001608262,0.00008443358,0.0000059171703,0.000005703309,0.000010350421,0.000023451681,0.99605286,0.00033803095,0.0024234822,0.0010284134,0.0000053547087],"about_ca_topic_score_codex":0.009974902,"about_ca_topic_score_gemma":0.009963545,"teacher_disagreement_score":0.009974902,"about_ca_system_score_codex":0.0011612893,"about_ca_system_score_gemma":0.001554114,"threshold_uncertainty_score":0.019833684},"labels":[],"label_agreement":null},{"id":"W3129431246","doi":"10.1016/j.procs.2021.01.264","title":"Simulation of ground bearing pressure profile under hydraulic crane outrigger mats for the verification of 16-point combined loading","year":2021,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Outrigger; Finite element method; Computer science; Modular design; Structural engineering; Point (geometry); Bearing (navigation); Hydraulic pressure; Marine engineering; Mechanical engineering; Mathematics; Engineering; Artificial intelligence; Geometry","score_opus":0.016421453650551754,"score_gpt":0.23381779564716576,"score_spread":0.217396341996614,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3129431246","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98726857,0.000028752802,0.0077199703,0.000046619156,0.000016359088,0.00003219467,0.00022999817,0.00019347186,0.0044640386],"genre_scores_gemma":[0.9973563,0.000019336934,0.0017641935,0.0000033202427,9.301781e-7,0.00001617141,0.00006275537,0.000009686062,0.0007673074],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998368,0.000023784873,0.000008175193,0.000021714199,0.000058704536,0.000050746625],"domain_scores_gemma":[0.99960476,0.00017322953,0.000051489496,0.00004236461,0.00007895616,0.000049212464],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026661306,0.00048854237,0.00045070532,0.00050766586,0.00044761505,0.0005006216,0.00087903935,0.0010070364,0.0033036405],"category_scores_gemma":[0.0006445908,0.00026593904,0.00040840506,0.00041795615,0.00065465603,0.0004289747,0.00043288743,0.00041271705,0.0002621928],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021411692,0.000107570326,0.0055188127,0.000097565215,0.000014548234,0.0006338759,0.00021301728,0.97159284,0.01446282,0.0008814018,0.00040426524,0.0058592497],"study_design_scores_gemma":[0.00001254941,0.00008710718,0.002480835,0.0000062438226,0.0000051028337,0.00002790314,0.00012058577,0.9936481,0.003322177,0.00008772509,0.000193996,0.0000076450815],"about_ca_topic_score_codex":0.009373651,"about_ca_topic_score_gemma":0.009766129,"teacher_disagreement_score":0.009373651,"about_ca_system_score_codex":0.00039378126,"about_ca_system_score_gemma":0.00064407376,"threshold_uncertainty_score":0.018638194},"labels":[],"label_agreement":null},{"id":"W3130658053","doi":"10.22215/etd/2016-11404","title":"Urban Systems: How Can a Parametric Building Information Model Serve to Democratize, Optimize and Challenge the Master Planning Process at Carleton University?","year":2016,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Parametric statistics; Computer science; Process (computing); Visualization; Resource (disambiguation); Variety (cybernetics); Parametric model; Building information modeling; Architectural engineering; Data science; Operations research; Industrial engineering; Engineering; Data mining; Artificial intelligence; Operations management; Programming language","score_opus":0.01144243084999849,"score_gpt":0.19743130849423957,"score_spread":0.18598887764424107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3130658053","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042755134,0.0017812054,0.8521621,0.02864829,0.0004194046,0.00017181605,0.0015322153,0.0018266183,0.07070317],"genre_scores_gemma":[0.54734325,0.0034519415,0.43528536,0.00073250954,0.00015309273,0.00018152787,0.0018654568,0.0008274292,0.010159448],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980108,0.0010552153,0.00006201921,0.00023151127,0.00049902336,0.00014157372],"domain_scores_gemma":[0.99658054,0.0016098862,0.00018432394,0.0008179486,0.0005896854,0.00021757043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049980856,0.00075771887,0.00089409074,0.0011225572,0.0010383204,0.009980775,0.0018885498,0.0013927269,0.0062305266],"category_scores_gemma":[0.014000783,0.00077932,0.00092483574,0.0019168494,0.0019891246,0.009695099,0.0031596706,0.0023987999,0.0016958686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006505738,0.00010179011,0.0030932992,0.00023821955,0.000092113216,0.000077825105,0.0010647194,0.43725437,0.00098614,0.4116052,0.015655084,0.12976615],"study_design_scores_gemma":[0.000016275748,0.00004859773,0.00093888777,0.00027121732,0.000033345128,0.00005261567,0.0018919022,0.54025894,0.001232903,0.3652542,0.089923844,0.000077268],"about_ca_topic_score_codex":0.017245898,"about_ca_topic_score_gemma":0.025390107,"teacher_disagreement_score":0.017245898,"about_ca_system_score_codex":0.0025863452,"about_ca_system_score_gemma":0.0044260956,"threshold_uncertainty_score":0.03429103},"labels":[],"label_agreement":null},{"id":"W3131928659","doi":"","title":"Projects For Sale - 2473 Atkins Avenue- Coquitlam- British Columbia - Price $0","year":2018,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Business; Economics","score_opus":0.010081871353932736,"score_gpt":0.20382618369806088,"score_spread":0.19374431234412814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3131928659","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015176057,0.00032026638,0.00046290338,0.00035340397,0.0002676615,0.00014907484,0.0035340434,0.0011857211,0.9922092],"genre_scores_gemma":[0.0012744846,0.00010522025,0.00014700736,0.000031568812,0.0000059630775,0.0000149170155,0.00083333964,0.00022420993,0.9973634],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.999332,0.000025922956,0.000013785682,0.00009655274,0.0003918965,0.00013977128],"domain_scores_gemma":[0.99822134,0.000090254376,0.000020603151,0.00013589808,0.0010701983,0.00046171364],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.00045911002,0.0013317524,0.0009261809,0.0018556523,0.00424841,0.004463597,0.0014545053,0.0014641596,0.8997672],"category_scores_gemma":[0.0017849639,0.0010736577,0.0008429359,0.0023158675,0.000774912,0.0015243203,0.002152407,0.0017646722,0.711158],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000922248,0.000068482535,0.0005194396,0.000083703555,0.0000043724303,0.000049951937,0.00007885374,0.00009664007,0.0006518725,0.0010413093,0.93063986,0.06667321],"study_design_scores_gemma":[0.0000355853,0.00004670704,0.0038731028,0.000091394235,0.000008520077,0.00005746801,0.00037927928,0.0001671237,0.00028239604,0.00027057045,0.9947678,0.000020099409],"about_ca_topic_score_codex":0.5055749,"about_ca_topic_score_gemma":0.82852817,"teacher_disagreement_score":0.49442512,"about_ca_system_score_codex":0.00507532,"about_ca_system_score_gemma":0.010501773,"threshold_uncertainty_score":0.9946738},"labels":[],"label_agreement":null},{"id":"W3133047794","doi":"10.29173/mocs243","title":"Front matter, 2017 MOC Summit proceedings","year":2017,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Summit; Front (military); Geology; Geography; Physical geography; Oceanography","score_opus":0.01020518121897918,"score_gpt":0.2128277905106247,"score_spread":0.20262260929164552,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3133047794","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023451447,0.0021045732,0.0010311274,0.016765103,0.014200675,0.000102688646,0.0044911355,0.0007189857,0.9582405],"genre_scores_gemma":[0.0074538854,0.0016229934,0.00056244544,0.000945242,0.0016771401,0.00006398581,0.00335835,0.00031616713,0.9839998],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99903524,0.00006537626,0.000029786323,0.00007907164,0.00064929295,0.00014127293],"domain_scores_gemma":[0.9975854,0.00016210359,0.00007586949,0.00012388868,0.0012097929,0.0008428818],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0011084777,0.0007300357,0.00041133096,0.0020248313,0.0022439181,0.0060996977,0.00083638675,0.0016989277,0.45357096],"category_scores_gemma":[0.0030380054,0.00017079509,0.00027477226,0.0013264561,0.0009701137,0.002266553,0.0030161364,0.0016297518,0.2773125],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000020784153,0.000025658639,0.00020345535,0.00007403305,0.0000013910259,0.000039373066,0.000049566595,0.000047470432,0.00011774676,0.0022037416,0.956166,0.04105066],"study_design_scores_gemma":[0.00000298322,0.000006025385,0.0005804617,0.00008375577,0.0000013010321,0.000016026817,0.00014595332,0.00007522956,0.00015954161,0.0008321366,0.99809283,0.0000036336942],"about_ca_topic_score_codex":0.011016922,"about_ca_topic_score_gemma":0.04922509,"teacher_disagreement_score":0.54642904,"about_ca_system_score_codex":0.0027684565,"about_ca_system_score_gemma":0.005013335,"threshold_uncertainty_score":0.7794147},"labels":[],"label_agreement":null},{"id":"W3134427693","doi":"10.1155/2021/8839362","title":"Procedural Modeling-Based BIM Approach for Railway Design","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Interoperability; Information model; Process (computing); Parametric statistics; Computer science; Systems engineering; Architecture; Software engineering; Engineering; Scheduling (production processes); Construction engineering; Parametric model; World Wide Web","score_opus":0.017264058187884075,"score_gpt":0.22784127549832284,"score_spread":0.21057721731043877,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3134427693","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001276431,0.00024728847,0.9861093,0.00013538612,0.0000344639,0.000048329093,0.00014725189,0.00043675132,0.011564715],"genre_scores_gemma":[0.10381386,0.00158598,0.8791566,0.00015280486,0.00006686559,0.00038524045,0.0011688446,0.00045222958,0.013217591],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922454,0.00018226728,0.00004783753,0.000112646856,0.0003853112,0.000047362388],"domain_scores_gemma":[0.999757,0.00006328846,0.000023469607,0.000061393956,0.00007968764,0.000015130965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006812883,0.0007980825,0.0007821706,0.002234103,0.0006933605,0.003046082,0.0021236532,0.001158548,0.007047052],"category_scores_gemma":[0.0009760653,0.00071756495,0.0022303488,0.0022798227,0.00089021656,0.0015556618,0.0019915549,0.001296142,0.0026223774],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036694433,0.00008278466,0.00070422684,0.00046166885,0.00008552452,0.0003936586,0.00068464753,0.42046338,0.0079863705,0.43261284,0.0068973736,0.12959075],"study_design_scores_gemma":[0.000014860818,0.000047363523,0.00036479213,0.00014247085,0.000063760184,0.00046054233,0.00023151273,0.7567343,0.0034953847,0.08674795,0.15164776,0.000049350372],"about_ca_topic_score_codex":0.0037587048,"about_ca_topic_score_gemma":0.004092615,"teacher_disagreement_score":0.007047052,"about_ca_system_score_codex":0.00078491913,"about_ca_system_score_gemma":0.0016185435,"threshold_uncertainty_score":0.02357477},"labels":[],"label_agreement":null},{"id":"W3135984895","doi":"10.5555/1161734.3259863","title":"Session details: Construction engineering and project management: construction engineering II","year":2004,"lang":"en","type":"article","venue":"Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Session (web analytics); Computer science; Project management; Construction engineering; Software engineering; Engineering management; Systems engineering; Engineering; World Wide Web","score_opus":0.012255600832211678,"score_gpt":0.21960053074658714,"score_spread":0.20734492991437548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3135984895","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009094612,0.004946216,0.009308873,0.020689853,0.07355406,0.0013897662,0.0064794314,0.0035541877,0.870983],"genre_scores_gemma":[0.015278338,0.001722143,0.00086235395,0.0009964128,0.004956873,0.00039319717,0.0027727184,0.00072909,0.9722889],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992994,0.0001118812,0.000028704246,0.0001371532,0.00018750303,0.00023535245],"domain_scores_gemma":[0.9975528,0.00021393773,0.000045790257,0.00013773724,0.0006609729,0.0013887559],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.001916002,0.0024717613,0.0022915134,0.0011236619,0.0041434704,0.0060083694,0.0013010281,0.0041538663,0.66521657],"category_scores_gemma":[0.0013465105,0.0005632838,0.0013467246,0.001868761,0.00043698918,0.0026516884,0.0041180155,0.0031989126,0.3762811],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045467896,0.00034589722,0.00040742505,0.00020163982,0.000012633247,0.00006984181,0.00017296964,0.0004730389,0.0017909836,0.0012352202,0.958732,0.03610376],"study_design_scores_gemma":[0.000084055544,0.00018456447,0.0022815221,0.00012273909,0.000012456135,0.000053599568,0.00028326898,0.00075952127,0.00087853003,0.0008178561,0.9944969,0.000025000294],"about_ca_topic_score_codex":0.00256757,"about_ca_topic_score_gemma":0.007280425,"teacher_disagreement_score":0.33478343,"about_ca_system_score_codex":0.0013146013,"about_ca_system_score_gemma":0.0026065116,"threshold_uncertainty_score":0.47752792},"labels":[],"label_agreement":null},{"id":"W3136771914","doi":"10.1155/2021/8843277","title":"Development of a Semiautomatic Parametric Method for Creation of an I-BIM Model of a Tunnel for Use in FEM Software","year":2021,"lang":"en","type":"article","venue":"Journal of Advanced Transportation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Javna Agencija za Raziskovalno Dejavnost RS","keywords":"Finite element method; Software; Parametric statistics; Process (computing); Quantum tunnelling; Parametric model; Engineering; Computer science; Structural engineering; Mechanical engineering; Physics","score_opus":0.0239057441577804,"score_gpt":0.28295582124422575,"score_spread":0.25905007708644534,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3136771914","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000803971,0.000010384565,0.99727935,0.000011018211,0.000008472225,0.000037283375,0.00003854002,0.0012575916,0.0005534216],"genre_scores_gemma":[0.025898954,0.000050485316,0.97158337,0.000019919391,0.000007013668,0.0002056359,0.00030117782,0.0007852915,0.0011483043],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99855953,0.0001895558,0.00009713209,0.00022128984,0.0008511488,0.00008134815],"domain_scores_gemma":[0.99866176,0.00037022808,0.00009718207,0.00031719604,0.00050699076,0.00004658429],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017779457,0.0008139621,0.0006425606,0.0014941812,0.0006351286,0.0016251365,0.002114853,0.00092623295,0.006967721],"category_scores_gemma":[0.002868005,0.0010654447,0.0013522955,0.00073290063,0.00074567285,0.0012958272,0.0016328924,0.001503467,0.0030383666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014108181,0.0001708634,0.0025673336,0.00077797874,0.00008505908,0.0004889344,0.0011786516,0.24030578,0.10035849,0.057556942,0.009703737,0.58666515],"study_design_scores_gemma":[0.00003411529,0.00014723763,0.0012366055,0.00014053748,0.00003631308,0.00076189666,0.00025343907,0.85324895,0.061737604,0.011378903,0.07090301,0.00012136506],"about_ca_topic_score_codex":0.0021515675,"about_ca_topic_score_gemma":0.002588943,"teacher_disagreement_score":0.006967721,"about_ca_system_score_codex":0.00044253372,"about_ca_system_score_gemma":0.0018874623,"threshold_uncertainty_score":0.02330935},"labels":[],"label_agreement":null},{"id":"W3138039968","doi":"10.29173/mocs153","title":"Defined Variables for Modular Construction Multi Project Scheduling","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Scheduling (production processes); Schedule; Modular construction; Computer science; Engineering; Manufacturing engineering; Systems engineering; Operations research; Industrial engineering; Operations management; Operating system","score_opus":0.02627763193702548,"score_gpt":0.22907776078354458,"score_spread":0.2028001288465191,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138039968","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.048142917,0.0010959657,0.9318584,0.00032802002,0.0001643367,0.0008527591,0.0011972117,0.00022206422,0.016138399],"genre_scores_gemma":[0.44616064,0.0010809832,0.54460096,0.000090475085,0.0000830555,0.0017537356,0.0017813181,0.000102347134,0.0043465607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9966534,0.0016147599,0.00032863236,0.00043354594,0.0007042117,0.00026550287],"domain_scores_gemma":[0.99589753,0.0022136024,0.0007922517,0.0001547223,0.00081748,0.00012447032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038841614,0.0012116521,0.00069812825,0.0019264413,0.00064131,0.002148112,0.0011948028,0.00057120976,0.004493996],"category_scores_gemma":[0.007363699,0.0002827637,0.00086572894,0.003409417,0.0005730341,0.0018757657,0.00088002544,0.0012458753,0.00044016525],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028856975,0.00034270252,0.011896124,0.0013131851,0.00015124698,0.00022030284,0.00087310217,0.53136355,0.003890398,0.2600179,0.0055609355,0.18408193],"study_design_scores_gemma":[0.000086024374,0.000746623,0.009137619,0.00044193884,0.00015151505,0.00019044032,0.001295977,0.8192035,0.006608373,0.09322087,0.06880966,0.00010751478],"about_ca_topic_score_codex":0.0035192638,"about_ca_topic_score_gemma":0.0035417073,"teacher_disagreement_score":0.004493996,"about_ca_system_score_codex":0.0023950464,"about_ca_system_score_gemma":0.002991159,"threshold_uncertainty_score":0.020541668},"labels":[],"label_agreement":null},{"id":"W3138296130","doi":"10.29173/mocs50","title":"Near Optimum Selection of Module Configuration for Efficient Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Index (typography); Scheduling (production processes); Computer science; Selection (genetic algorithm); Reliability engineering; Engineering; Transport engineering; Systems engineering; Industrial engineering; Operations management","score_opus":0.011036560272583427,"score_gpt":0.20388319248715936,"score_spread":0.19284663221457593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3138296130","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.62354255,0.00019354126,0.35991266,0.00004515438,0.000018626006,0.00011902213,0.00016440066,0.00042328844,0.015580651],"genre_scores_gemma":[0.921294,0.00010322045,0.07717641,0.000010379718,0.000005744988,0.00005555262,0.00019544493,0.000091337126,0.001067938],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992599,0.00017908608,0.000043459273,0.00010758386,0.0003036087,0.00010629732],"domain_scores_gemma":[0.99945146,0.0001227899,0.00013216809,0.000079233236,0.00016200896,0.00005233163],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00086878985,0.0007582104,0.0005488215,0.0016077124,0.00034425454,0.00069574354,0.00036751543,0.00034767346,0.002295342],"category_scores_gemma":[0.0015350465,0.00023987136,0.00038286266,0.00089659705,0.00031879425,0.00083445315,0.0009076578,0.0002227948,0.0006525932],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034028024,0.00022578832,0.05831761,0.00034008134,0.00009957275,0.00048411012,0.00029388198,0.3553134,0.22277407,0.01151819,0.0021785963,0.3481144],"study_design_scores_gemma":[0.000056092707,0.0017821303,0.117607415,0.00009453641,0.00017653493,0.0012643929,0.0010098686,0.59957635,0.2440626,0.015933461,0.018279396,0.00015720385],"about_ca_topic_score_codex":0.00038469143,"about_ca_topic_score_gemma":0.0014236111,"teacher_disagreement_score":0.002295342,"about_ca_system_score_codex":0.0002899413,"about_ca_system_score_gemma":0.00049549696,"threshold_uncertainty_score":0.0076786876},"labels":[],"label_agreement":null},{"id":"W3139789382","doi":"10.1109/wsc.2008.4736356","title":"Simulation of modular building construction","year":2008,"lang":"en","type":"article","venue":"2008 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"University of Alberta","keywords":"Modular design; Computer science; Process (computing); Modular construction; Quality (philosophy); Software; Construction management; Systems engineering; Engineering; Civil engineering; Operating system","score_opus":0.025515000818642976,"score_gpt":0.24314240046497587,"score_spread":0.2176273996463329,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3139789382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4910523,0.0002505723,0.44239742,0.0003433029,0.000090933856,0.00017344681,0.0011386137,0.0013036593,0.06324979],"genre_scores_gemma":[0.9635434,0.00015120415,0.029390698,0.000022000924,0.000008375189,0.00015351396,0.0004212063,0.00009898051,0.0062106224],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973017,0.000087737775,0.000011152191,0.00003486212,0.00008033623,0.00005565227],"domain_scores_gemma":[0.99928975,0.00040025977,0.00006323307,0.00006534192,0.00011277588,0.00006857505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004532453,0.0005344572,0.0005762922,0.00056461256,0.00039828976,0.00072479504,0.0007747735,0.00089936587,0.005215443],"category_scores_gemma":[0.0016705976,0.00039155042,0.000731655,0.0007311281,0.0006902201,0.0005176508,0.00085327256,0.0004173476,0.00052132417],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001609119,0.0000075671846,0.00038722414,0.000007593977,0.0000031857019,0.000013089819,0.000017214647,0.9964468,0.00031375507,0.0015841214,0.000072005896,0.0011312664],"study_design_scores_gemma":[0.000006766171,0.0000107304295,0.0001552469,0.0000023685218,0.0000019606432,0.0000060822435,0.000009459434,0.99817705,0.0002675655,0.00081849523,0.0005414137,0.0000028873537],"about_ca_topic_score_codex":0.010043547,"about_ca_topic_score_gemma":0.006439222,"teacher_disagreement_score":0.010043547,"about_ca_system_score_codex":0.0008605997,"about_ca_system_score_gemma":0.0010405509,"threshold_uncertainty_score":0.019970179},"labels":[],"label_agreement":null},{"id":"W3142666957","doi":"10.1109/wsc.2007.4419839","title":"Construction noise prediction and barrier optimization using special purpose simulation","year":2007,"lang":"en","type":"article","venue":"2007 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Noise barrier; Noise (video); Noise control; Plan (archaeology); Computer science; Simulation software; Software; Point (geometry); Noise pollution; Control (management); Simulation modeling; Roadway noise; Systems engineering; Simulation; Industrial engineering; Construction engineering; Transport engineering; Engineering; Noise reduction; Artificial intelligence","score_opus":0.01777994714528297,"score_gpt":0.24531387557983944,"score_spread":0.22753392843455647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3142666957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35929224,0.00012482128,0.62095785,0.00013410296,0.000050059312,0.000072589144,0.00026016278,0.0013779224,0.017730182],"genre_scores_gemma":[0.9655896,0.0001002833,0.03146353,0.000014902656,0.0000064690826,0.0000905193,0.00020646854,0.00010566381,0.002422509],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996884,0.0001379275,0.000013734608,0.000032577052,0.00008003105,0.00004739721],"domain_scores_gemma":[0.99944514,0.0002904646,0.000056313704,0.0000500013,0.00011785923,0.00004024175],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004541401,0.00071107823,0.0007439258,0.0006103619,0.00041144865,0.00079618575,0.0008565533,0.0010302024,0.0022939185],"category_scores_gemma":[0.0011489016,0.00053054694,0.0010185107,0.0006158518,0.00051881134,0.00044757177,0.0006837333,0.00043156074,0.00027589474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013883441,0.000007391069,0.0003268009,0.0000057891466,0.000004480781,0.000012482989,0.00000754405,0.998042,0.0003295299,0.00033200296,0.000034628178,0.0008834115],"study_design_scores_gemma":[0.0000027620483,0.000006218344,0.000068142625,9.715696e-7,0.0000018974575,0.000002699283,0.000003285671,0.999464,0.00022482232,0.00013567024,0.000088140056,0.0000014332011],"about_ca_topic_score_codex":0.017860712,"about_ca_topic_score_gemma":0.010864476,"teacher_disagreement_score":0.017860712,"about_ca_system_score_codex":0.00065150537,"about_ca_system_score_gemma":0.0009645467,"threshold_uncertainty_score":0.03551352},"labels":[],"label_agreement":null},{"id":"W3144893049","doi":"10.1109/wsc.2007.4419841","title":"Special purpose simulation template for workflow analysis in construction","year":2007,"lang":"en","type":"article","venue":"2007 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of Alberta","keywords":"Workflow; Computer science; Software engineering; Crew; Process (computing); Software; Workflow technology; Component (thermodynamics); Systems engineering; Database; Programming language; Engineering","score_opus":0.022093894050951288,"score_gpt":0.2739410176458618,"score_spread":0.2518471235949105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3144893049","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005559839,0.000022050697,0.97882676,0.00008157884,0.00007415296,0.0004396773,0.0005836213,0.0076393387,0.0067728953],"genre_scores_gemma":[0.11976031,0.0001634507,0.8627949,0.00015089686,0.00003366055,0.002207135,0.0037340757,0.0025442569,0.008611314],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988875,0.00032920632,0.00015560028,0.000116605916,0.00043967937,0.00007146232],"domain_scores_gemma":[0.99732286,0.0009702379,0.00014790447,0.0009367742,0.00054084434,0.00008146387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015747029,0.0007909167,0.0006255595,0.0007013936,0.00048133443,0.0010887297,0.0017557123,0.0010703462,0.010891217],"category_scores_gemma":[0.0047623836,0.0006257712,0.001393148,0.00060739653,0.00058583386,0.00091112586,0.0010194984,0.0011424593,0.0030831147],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00063384935,0.00047508924,0.005342196,0.00078163546,0.00014453134,0.0014671105,0.0013776214,0.5288319,0.060622483,0.20460792,0.03342026,0.16229539],"study_design_scores_gemma":[0.0000616023,0.00008380398,0.00047767648,0.00007694907,0.000031686028,0.00039380288,0.000052422292,0.8481337,0.036154862,0.014618685,0.09986982,0.000045028224],"about_ca_topic_score_codex":0.0016929714,"about_ca_topic_score_gemma":0.0015977123,"teacher_disagreement_score":0.010891217,"about_ca_system_score_codex":0.0008817469,"about_ca_system_score_gemma":0.0019162319,"threshold_uncertainty_score":0.03643477},"labels":[],"label_agreement":null},{"id":"W3145116359","doi":"10.1109/wsc.2006.322989","title":"Sensitivity Analysis of Construction Simulation using Cell-Devs and Microcyclone","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Sensitivity (control systems); DEVS; Visualization; Resource (disambiguation); Discrete event simulation; Modeling and simulation; Space (punctuation); Distributed computing; Resource allocation; Simulation modeling; Data visualization; Industrial engineering; Data mining; Theoretical computer science; Simulation; Mathematics; Engineering; Computer network","score_opus":0.005729441481799581,"score_gpt":0.19863846316700792,"score_spread":0.19290902168520835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145116359","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7491876,0.0005943606,0.22995639,0.00043207512,0.00009279338,0.0001985688,0.00078608084,0.00050373556,0.018248303],"genre_scores_gemma":[0.98741186,0.00010474518,0.0116792815,0.000023686174,0.000004747809,0.00007475456,0.00011859046,0.000026644038,0.0005556533],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998804,0.0006653686,0.000048456965,0.000080224454,0.00027276063,0.00012922955],"domain_scores_gemma":[0.9909916,0.007985898,0.00023692391,0.00028306848,0.00042191325,0.00008058969],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023168372,0.0007484444,0.00085164275,0.0013322643,0.00045625327,0.00077956624,0.00060692284,0.0008746802,0.0015027468],"category_scores_gemma":[0.0060083927,0.00044215695,0.00079624343,0.001062656,0.00065093156,0.0006156849,0.0009068849,0.0006905566,0.000087387925],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004690412,0.00001593364,0.0008397484,0.00002190155,0.000019972667,0.00002678101,0.000017403434,0.99480295,0.00045497264,0.0015129829,0.000059017788,0.0021815395],"study_design_scores_gemma":[0.0000034763182,0.000020938067,0.00029246637,0.00000285874,0.0000065791255,0.0000064935894,0.000012128649,0.9980673,0.0010062875,0.00040674326,0.00016804799,0.000006712125],"about_ca_topic_score_codex":0.016812008,"about_ca_topic_score_gemma":0.0072286017,"teacher_disagreement_score":0.016812008,"about_ca_system_score_codex":0.0014631427,"about_ca_system_score_gemma":0.0006799864,"threshold_uncertainty_score":0.03342825},"labels":[],"label_agreement":null},{"id":"W3145353663","doi":"10.1109/wsc48552.2020.9384073","title":"A Simulation-Based Decision-Support System for Reducing Duration, Cost, and Environmental Impacts of Earthmoving Operations","year":2020,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Research and Development","keywords":"Scheduling (production processes); Operations research; Decision support system; Discrete event simulation; Duration (music); Control (management); Computer science; Engineering; Operations management; Simulation","score_opus":0.011057735725893783,"score_gpt":0.22147167057185313,"score_spread":0.21041393484595936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145353663","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18292682,0.00016440808,0.79868174,0.00058176543,0.00010788295,0.00036820516,0.0005856191,0.006289668,0.010293901],"genre_scores_gemma":[0.8750167,0.00016058094,0.12179935,0.000059507955,0.000014759554,0.00024258818,0.00043447773,0.000058137655,0.0022139924],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997389,0.00010045449,0.000023417133,0.00004236108,0.00006782579,0.00002709571],"domain_scores_gemma":[0.99919146,0.00043719777,0.00006905919,0.000063832835,0.00015488651,0.00008359645],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089512503,0.00064773957,0.00048266773,0.00058983895,0.00047398574,0.0008500305,0.0008282232,0.00059167313,0.0033706324],"category_scores_gemma":[0.0019503745,0.00031507446,0.00032420675,0.00036718065,0.00031134934,0.00077553466,0.00075275754,0.00045014906,0.00033625597],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027409312,0.00014791051,0.0013859909,0.000038488768,0.000026592441,0.000069764516,0.00005661914,0.9633686,0.004721922,0.0028591598,0.0010278826,0.026022958],"study_design_scores_gemma":[0.000018052648,0.000029112818,0.0001190557,0.000003690617,0.000007600205,0.0000051587117,0.000008720096,0.9974923,0.0009543664,0.00048795843,0.00086929323,0.000004607534],"about_ca_topic_score_codex":0.0060244263,"about_ca_topic_score_gemma":0.0061340383,"teacher_disagreement_score":0.0060244263,"about_ca_system_score_codex":0.0008135104,"about_ca_system_score_gemma":0.0016941217,"threshold_uncertainty_score":0.011978686},"labels":[],"label_agreement":null},{"id":"W3145372498","doi":"10.1109/wsc.2008.4736349","title":"Distributed agent-based simulation of construction projects with HLA","year":2008,"lang":"en","type":"article","venue":"2008 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"High-level architecture; Interoperability; Schedule; Computer science; Reuse; Systems engineering; Process (computing); Resource (disambiguation); Distributed computing; Software engineering; Engineering; Computer network; Operating system","score_opus":0.028782903285659106,"score_gpt":0.23301223187130074,"score_spread":0.20422932858564163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145372498","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19835718,0.00009257751,0.7827314,0.00031116494,0.000036304453,0.00021346168,0.0001483981,0.0009526348,0.017156849],"genre_scores_gemma":[0.8994939,0.00011026715,0.09669528,0.000030373185,0.000007865417,0.0003120308,0.0001257598,0.000048863414,0.0031757406],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934596,0.00039794677,0.000032327134,0.000051408417,0.00011965577,0.00005278989],"domain_scores_gemma":[0.99908113,0.00050401257,0.00006707051,0.00015819467,0.00011858497,0.000070914524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011021921,0.00026765832,0.00043798026,0.00040407508,0.0005254726,0.0013210286,0.0010051654,0.0008518582,0.0023295195],"category_scores_gemma":[0.002220691,0.00037211212,0.00043069955,0.00071209035,0.0007586451,0.0010332838,0.0012807876,0.0007462198,0.00025066928],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032825254,0.0000328066,0.0005680213,0.000007247829,0.000008596674,0.000049997576,0.0000724706,0.9846372,0.0005346544,0.011156729,0.00012277212,0.0027767427],"study_design_scores_gemma":[0.000014417273,0.000011441724,0.00009513059,0.0000018833395,0.0000024660576,0.0000065128606,0.000016839882,0.9966446,0.000241549,0.0024070956,0.0005551144,0.0000029331388],"about_ca_topic_score_codex":0.009332496,"about_ca_topic_score_gemma":0.005011865,"teacher_disagreement_score":0.009332496,"about_ca_system_score_codex":0.0010212585,"about_ca_system_score_gemma":0.001522476,"threshold_uncertainty_score":0.018556356},"labels":[],"label_agreement":null},{"id":"W3145698671","doi":"","title":"A Quarter Century of Work to Revolutionize Architecture, Engineering and Construction Enterprise Information Systems","year":2017,"lang":"en","type":"article","venue":"土木工程与建筑：英文版","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architecture; Work (physics); Engineering; Engineering management; Computer science; Architectural engineering; Construction engineering; Geography; Mechanical engineering","score_opus":0.0028663609175127273,"score_gpt":0.16738457735145115,"score_spread":0.16451821643393844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3145698671","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039469186,0.17719956,0.03405197,0.34959826,0.017725764,0.0000953408,0.0004708875,0.0004159148,0.38097307],"genre_scores_gemma":[0.5648599,0.11768287,0.044078764,0.098137066,0.01790796,0.0002470147,0.00058350636,0.0007276434,0.15577531],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99584705,0.001409939,0.00018431163,0.0006157708,0.0014612302,0.00048169857],"domain_scores_gemma":[0.9942457,0.0026643788,0.000319296,0.00088411686,0.0012704721,0.000616068],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006679927,0.0006425783,0.0006113068,0.002528682,0.0027958122,0.01122029,0.0011353726,0.0056304224,0.015016392],"category_scores_gemma":[0.00843102,0.00041873762,0.00074125297,0.0047599818,0.011724942,0.011832139,0.0057138363,0.0055271126,0.0024304169],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011271024,0.00012639548,0.00074245944,0.00042509512,0.000035193945,0.00008465066,0.0031266164,0.0007954636,0.0011128669,0.81972104,0.05069068,0.12302685],"study_design_scores_gemma":[0.00001867261,0.000031314903,0.001029451,0.0005644919,0.00001076105,0.000089646994,0.002363239,0.0006931655,0.00056079996,0.12469157,0.8699209,0.000025889909],"about_ca_topic_score_codex":0.0051398547,"about_ca_topic_score_gemma":0.0067083607,"teacher_disagreement_score":0.015016392,"about_ca_system_score_codex":0.007676626,"about_ca_system_score_gemma":0.0072459434,"threshold_uncertainty_score":0.055698097},"labels":[],"label_agreement":null},{"id":"W3148011496","doi":"10.1108/ci-03-2020-0039","title":"Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Workflow; Process (computing); Computer science; Process management; Systems engineering; Dissemination; Materials management; Engineering management; Engineering; Operations management; Database","score_opus":0.013551025085248835,"score_gpt":0.2246535651735792,"score_spread":0.21110254008833038,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148011496","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08346875,0.0005155284,0.87446105,0.0012090985,0.00010449281,0.0004892844,0.00040073917,0.00405353,0.035297535],"genre_scores_gemma":[0.60761744,0.00049722014,0.3871864,0.000201818,0.000036507052,0.00020780164,0.0004411445,0.00019843249,0.0036131819],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9979526,0.00049185957,0.00016064954,0.000542811,0.0006767947,0.00017530218],"domain_scores_gemma":[0.99396,0.0019356073,0.0011429328,0.001945143,0.0007908661,0.00022532795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033587373,0.0006256656,0.0003825296,0.0031163103,0.0010170295,0.0036561394,0.0012582504,0.0007249746,0.0066983597],"category_scores_gemma":[0.008071336,0.0004701615,0.0005806759,0.0026841725,0.0015028636,0.0057949033,0.0028148834,0.0011549806,0.0010869623],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036689933,0.00049174624,0.016080234,0.00059102837,0.00006937892,0.00033348188,0.0028410803,0.052388206,0.03304325,0.06648273,0.0046446393,0.82266724],"study_design_scores_gemma":[0.00019972367,0.001218443,0.052528195,0.0011245419,0.00035174188,0.0010893198,0.006231558,0.46098962,0.13766514,0.0869516,0.25123078,0.00041930843],"about_ca_topic_score_codex":0.0044033583,"about_ca_topic_score_gemma":0.0048690275,"teacher_disagreement_score":0.0066983597,"about_ca_system_score_codex":0.0019160213,"about_ca_system_score_gemma":0.003080926,"threshold_uncertainty_score":0.022408307},"labels":[],"label_agreement":null},{"id":"W3148219949","doi":"10.1109/wsc.2009.5429307","title":"An overview of the COSYE environment for construction simulation","year":2009,"lang":"en","type":"article","venue":"Proceedings of the 2009 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; Discrete event simulation; Architecture; Systems engineering; High-level architecture; Process (computing); Event (particle physics); Software engineering; Construction management; Simulation; Engineering; Civil engineering; Interoperability","score_opus":0.037698618953365785,"score_gpt":0.27077258136018756,"score_spread":0.23307396240682177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148219949","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016465879,0.0013315761,0.93590635,0.00058654125,0.00021905953,0.000306981,0.0009835268,0.010706227,0.048313227],"genre_scores_gemma":[0.040571652,0.0059048636,0.925208,0.00031774628,0.00028424794,0.0018302883,0.004013345,0.004432334,0.017437557],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977895,0.00081630604,0.0002456956,0.00017842292,0.00083040935,0.00013962915],"domain_scores_gemma":[0.997982,0.00093508174,0.00007591,0.0004763085,0.00036706892,0.0001636797],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028790955,0.001204689,0.0012389189,0.0019258537,0.0010162871,0.0044943565,0.0023581188,0.0017590818,0.036301337],"category_scores_gemma":[0.005330726,0.0012444941,0.0016528339,0.002753978,0.0012917491,0.003910412,0.003914948,0.0032442391,0.010911031],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029154232,0.00022548692,0.0020388956,0.0008936135,0.00010533302,0.00044237098,0.0007945667,0.14870907,0.0055090515,0.541576,0.064696215,0.2347178],"study_design_scores_gemma":[0.00009688233,0.000051912004,0.0004844634,0.00033433284,0.000017184451,0.0002602007,0.000121708574,0.21031652,0.0024129471,0.06838299,0.71744347,0.00007737529],"about_ca_topic_score_codex":0.003960906,"about_ca_topic_score_gemma":0.0039870124,"teacher_disagreement_score":0.036301337,"about_ca_system_score_codex":0.0011450032,"about_ca_system_score_gemma":0.002057873,"threshold_uncertainty_score":0.12144011},"labels":[],"label_agreement":null},{"id":"W3148677849","doi":"10.1109/wsc.2011.6148052","title":"Loosely coupled visualization of industrial construction simulation using a gaming engine","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Computer science; Pipeline (software); Interactive simulation; Window (computing); Distributed Interactive Simulation; Virtual reality; Human–computer interaction; Distributed computing; Simulation; Operating system; Artificial intelligence","score_opus":0.05648870252293158,"score_gpt":0.250925514789634,"score_spread":0.1944368122667024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148677849","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.112104796,0.000085511965,0.8659418,0.00017595399,0.000046845835,0.00020039441,0.0002489246,0.007866666,0.013329078],"genre_scores_gemma":[0.6114815,0.00019289812,0.3798522,0.00006802137,0.000016075448,0.00025480735,0.0004956373,0.00077764335,0.0068612825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996081,0.00017046866,0.000024805891,0.0000448832,0.000116624506,0.000035177658],"domain_scores_gemma":[0.99949694,0.0002039576,0.000024400462,0.00011316302,0.000084563755,0.000076918455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00054196484,0.0006283233,0.0003609694,0.0005422524,0.00038369797,0.0015210342,0.00090418087,0.0005020081,0.003958668],"category_scores_gemma":[0.0012016704,0.0003619025,0.00064696744,0.0004337487,0.00038919644,0.00069133926,0.0017062942,0.00071030774,0.0004961246],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008549046,0.0004289782,0.008186021,0.00027084874,0.0001635203,0.0011823036,0.0037393651,0.5935341,0.16879217,0.060540035,0.005868676,0.15643908],"study_design_scores_gemma":[0.000056533456,0.00013554843,0.0030098415,0.000034062105,0.000033107764,0.00016602578,0.00016402442,0.9446668,0.024660513,0.008537291,0.018467087,0.00006917698],"about_ca_topic_score_codex":0.005068684,"about_ca_topic_score_gemma":0.0051986324,"teacher_disagreement_score":0.005068684,"about_ca_system_score_codex":0.0005545394,"about_ca_system_score_gemma":0.0007760248,"threshold_uncertainty_score":0.013243079},"labels":[],"label_agreement":null},{"id":"W3148877989","doi":"10.1109/wsc.2011.6148036","title":"Defining background tasks in SimFC","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Process (computing); Simplicity; Resource (disambiguation); Industrial engineering; Simulation modeling; Construction management; Simulation; Systems engineering; Engineering; Civil engineering","score_opus":0.021860961115652784,"score_gpt":0.20787554132672473,"score_spread":0.18601458021107195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148877989","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026523838,0.000097219505,0.96125376,0.00010598736,0.000024430528,0.00035972864,0.0004074771,0.0019343323,0.009293243],"genre_scores_gemma":[0.21605399,0.00021310685,0.77667904,0.00011021686,0.000016673202,0.00095526397,0.0013531215,0.00067488267,0.003943637],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.998195,0.00058718555,0.0001545306,0.00029089194,0.0004948589,0.00027753058],"domain_scores_gemma":[0.99739397,0.0010640745,0.00019207565,0.0007251169,0.00046372414,0.00016105788],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022010994,0.0011210274,0.0006826854,0.0010923112,0.00080689404,0.002261524,0.001769037,0.0014691623,0.0038875926],"category_scores_gemma":[0.0058881734,0.00067673717,0.00078219594,0.00087799726,0.0015110342,0.002375306,0.002889088,0.0014203206,0.0012173929],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035837406,0.00021725615,0.005781278,0.00044804363,0.00003521932,0.0004058746,0.0025949294,0.63179624,0.008764931,0.2443278,0.0039681923,0.10130178],"study_design_scores_gemma":[0.00004577564,0.000084833984,0.0006204007,0.00011367621,0.00001786287,0.00015487248,0.0003145155,0.8869864,0.00832495,0.04452218,0.058778964,0.00003558892],"about_ca_topic_score_codex":0.010041124,"about_ca_topic_score_gemma":0.0076352884,"teacher_disagreement_score":0.010041124,"about_ca_system_score_codex":0.0016367065,"about_ca_system_score_gemma":0.0036047124,"threshold_uncertainty_score":0.01996535},"labels":[],"label_agreement":null},{"id":"W3148923809","doi":"10.1109/wsc.2011.6148048","title":"Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Computer science; Task (project management); Simulation modeling; Productivity; Data mining; Real-time computing; Systems engineering; Engineering","score_opus":0.027703407505942607,"score_gpt":0.23624791773201415,"score_spread":0.20854451022607154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3148923809","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011726319,0.00013265634,0.9860093,0.000096798605,0.000014737821,0.000034714856,0.000036143134,0.00017311898,0.0017763497],"genre_scores_gemma":[0.43303975,0.0009089213,0.5635342,0.00005390619,0.000025295316,0.0002771024,0.00021940273,0.000093345894,0.0018481404],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99885046,0.0005902982,0.00006774886,0.000116669,0.00031737372,0.00005752233],"domain_scores_gemma":[0.9988427,0.00063859223,0.0001492481,0.00011559095,0.00019680131,0.00005709793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016822281,0.00064001285,0.0006955821,0.0006903211,0.00029117343,0.0014657638,0.001462449,0.0011262542,0.0011977684],"category_scores_gemma":[0.0038133343,0.00048392476,0.0010210065,0.0011812566,0.0008892179,0.0014969513,0.0010840007,0.0009265486,0.00031541256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003670452,0.000025136951,0.0006745698,0.000077971745,0.000019299436,0.00006257419,0.00018789874,0.96775883,0.0031309067,0.018051408,0.00016650191,0.009808168],"study_design_scores_gemma":[0.000010996224,0.000017311371,0.0001367218,0.000015598082,0.000009332107,0.000031772717,0.000042975622,0.9912804,0.0014644123,0.004685666,0.0022951346,0.000009750145],"about_ca_topic_score_codex":0.005309573,"about_ca_topic_score_gemma":0.0035319955,"teacher_disagreement_score":0.005309573,"about_ca_system_score_codex":0.0008304806,"about_ca_system_score_gemma":0.0015420911,"threshold_uncertainty_score":0.0105573535},"labels":[],"label_agreement":null},{"id":"W3153916170","doi":"10.1016/j.autcon.2021.103700","title":"A computational methodology for generating modular design options for building extensions","year":2021,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"University of Waterloo","keywords":"Modular design; Computer science; Efficient energy use; Demolition; Architectural engineering; Systems engineering; Building design; Pareto principle; Axiomatic design; Risk analysis (engineering); Engineering; Civil engineering; Manufacturing engineering; Operations management","score_opus":0.06617196106758301,"score_gpt":0.30674792226728026,"score_spread":0.24057596119969726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153916170","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004043954,0.000025543126,0.9928953,0.00003753175,0.000012178454,0.000041480598,0.00006496208,0.00016470512,0.0027143455],"genre_scores_gemma":[0.13479425,0.000070693015,0.8621801,0.000043197993,0.000018749264,0.00020614015,0.00026197644,0.00014715968,0.0022776872],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956053,0.00010720025,0.000024753455,0.00007440978,0.00019331613,0.000039745206],"domain_scores_gemma":[0.99906296,0.000581325,0.000052681058,0.00014660547,0.00012631217,0.00003015437],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010760459,0.0007857105,0.0008797592,0.0013411894,0.00083743467,0.0014629861,0.0019315014,0.0011282541,0.008367712],"category_scores_gemma":[0.0032855896,0.000674971,0.0018199724,0.0010977497,0.001312602,0.0013109354,0.0019907353,0.0013679842,0.00095847575],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039974053,0.000099523466,0.0004908284,0.00018440293,0.000042923377,0.00017075248,0.00014566147,0.63007855,0.0032728778,0.26791924,0.0019052478,0.09565011],"study_design_scores_gemma":[0.000012144407,0.000014450532,0.000057270103,0.000021487249,0.000012501635,0.000032256703,0.000022654902,0.91563654,0.0008462859,0.08073331,0.0026036422,0.000007412726],"about_ca_topic_score_codex":0.002026446,"about_ca_topic_score_gemma":0.005100266,"teacher_disagreement_score":0.008367712,"about_ca_system_score_codex":0.0006357245,"about_ca_system_score_gemma":0.000981191,"threshold_uncertainty_score":0.027992785},"labels":[],"label_agreement":null},{"id":"W3153970484","doi":"10.1007/978-3-030-70566-4_65","title":"Industry 4.0 and BIM: Do They Share the Same Objectives?","year":2021,"lang":"en","type":"book-chapter","venue":"Lecture notes in mechanical engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Software deployment; Emerging technologies; Business; Engineering; Digital transformation; Architectural engineering; Computer science; World Wide Web","score_opus":0.008419968299929324,"score_gpt":0.19762310569134733,"score_spread":0.189203137391418,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3153970484","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008861703,0.6029652,0.021823157,0.063207075,0.005952695,0.00006411781,0.00009933205,0.00019408936,0.2968327],"genre_scores_gemma":[0.20902091,0.55584437,0.036158655,0.03564568,0.0049628895,0.0002668097,0.0005287633,0.0003828172,0.15718915],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99573743,0.0017861798,0.0001924275,0.0002879179,0.0016994312,0.00029664012],"domain_scores_gemma":[0.99702746,0.0014513385,0.00030360714,0.0001839003,0.0007568383,0.00027690842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005388732,0.0006403234,0.0009566959,0.002591311,0.0010260992,0.011463122,0.001647889,0.0029661916,0.009718953],"category_scores_gemma":[0.003058039,0.00038061044,0.00069701637,0.005051953,0.005894463,0.013935162,0.0041342746,0.004245879,0.003127834],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003945802,0.00007307466,0.0010491882,0.003148476,0.000052443203,0.00030170963,0.005226025,0.00040262032,0.0006776886,0.5817016,0.031279966,0.3760478],"study_design_scores_gemma":[0.000008615809,0.00008503361,0.002083584,0.0063206926,0.000036425958,0.0006777651,0.01006249,0.00047736507,0.00044160508,0.15180047,0.82796586,0.000040028262],"about_ca_topic_score_codex":0.0019951428,"about_ca_topic_score_gemma":0.0021238008,"teacher_disagreement_score":0.011463122,"about_ca_system_score_codex":0.0026679793,"about_ca_system_score_gemma":0.0053783604,"threshold_uncertainty_score":0.03251314},"labels":[],"label_agreement":null},{"id":"W3154051909","doi":"10.1108/ci-11-2019-0118","title":"Construction productivity assessment on Brock Commons Tallwood House","year":2021,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria; École de Technologie Supérieure; University of British Columbia","funders":"","keywords":"Schedule; Productivity; Prefabrication; Originality; Engineering; Integrated project delivery; Architectural engineering; Process (computing); Project management; Construction management; Construction engineering; Civil engineering; Computer science; Systems engineering; Qualitative research","score_opus":0.01418041334257206,"score_gpt":0.23688407603316036,"score_spread":0.2227036626905883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154051909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.990388,0.000039475384,0.001561421,0.000024831272,0.0000043950686,0.00013224875,0.000284421,0.00006231012,0.007502942],"genre_scores_gemma":[0.99137676,0.000059801543,0.0037022275,0.000006435099,0.0000029736998,0.000054363274,0.00044067967,0.000019790124,0.004336914],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.998456,0.00020913557,0.00006022352,0.0001611651,0.00093045685,0.00018301385],"domain_scores_gemma":[0.9960639,0.00080651423,0.00040982748,0.00020341181,0.0021829344,0.00033347908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015899832,0.00043461227,0.00026601183,0.0036128312,0.0012735595,0.0013512045,0.0006672585,0.000276175,0.0043611745],"category_scores_gemma":[0.003901651,0.00021510727,0.00026240162,0.0023900976,0.0005667563,0.0004557154,0.00077761087,0.0003480409,0.0005551129],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001252011,0.0013339593,0.50860834,0.0006073642,0.000094965086,0.002468252,0.016148811,0.026699949,0.0418721,0.0018579073,0.0038200174,0.39523622],"study_design_scores_gemma":[0.00001405551,0.0009957842,0.9423965,0.00008028046,0.000047571226,0.00022633749,0.019050134,0.0175744,0.012603671,0.00020024242,0.006761979,0.000049053313],"about_ca_topic_score_codex":0.08405946,"about_ca_topic_score_gemma":0.2145585,"teacher_disagreement_score":0.9159405,"about_ca_system_score_codex":0.004776827,"about_ca_system_score_gemma":0.0021214604,"threshold_uncertainty_score":0.16714036},"labels":[],"label_agreement":null},{"id":"W3154708143","doi":"10.29173/mocs150","title":"Learning from Previous BIM-Based Modular Construction Cases: Qualitative Comparative Analysis Approach","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Modular construction; Computer science; Building information modeling; Causality (physics); Risk analysis (engineering); Management science; Process management; Engineering; Operations management; Business","score_opus":0.035834368538964316,"score_gpt":0.25765509462239666,"score_spread":0.22182072608343234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3154708143","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.65796494,0.0017346202,0.20496348,0.0030293195,0.00012180037,0.0062017976,0.001568582,0.00012421238,0.12429127],"genre_scores_gemma":[0.88445705,0.0011987884,0.10663745,0.0002339773,0.000013194408,0.0032443344,0.00059542916,0.000029402725,0.0035903542],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9809131,0.01403664,0.0007270187,0.0008387105,0.0027884338,0.00069615967],"domain_scores_gemma":[0.9584782,0.033424657,0.0015280173,0.0014062573,0.0048272954,0.00033548358],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026643937,0.00060426636,0.0007473607,0.008915525,0.0034104262,0.004515908,0.0027573826,0.0013206651,0.0053949202],"category_scores_gemma":[0.03795321,0.00045079316,0.000693739,0.00997241,0.005451937,0.006081308,0.004171752,0.0010766299,0.00040347115],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032816763,0.00081304065,0.016178492,0.0030212405,0.000098606455,0.0020159732,0.38374978,0.008923355,0.003267265,0.32962665,0.0040016402,0.24797584],"study_design_scores_gemma":[0.00011062502,0.0005295757,0.012950777,0.0030173867,0.00015171345,0.00051818625,0.79681134,0.017308675,0.006834425,0.09746005,0.06416873,0.0001385129],"about_ca_topic_score_codex":0.0065549864,"about_ca_topic_score_gemma":0.013101503,"teacher_disagreement_score":0.026643937,"about_ca_system_score_codex":0.014489362,"about_ca_system_score_gemma":0.0064906306,"threshold_uncertainty_score":0.14090824},"labels":[],"label_agreement":null},{"id":"W3155372619","doi":"10.32722/cmj.v3i1.3506","title":"PERBANDINGAN METODE KONVENSIONAL DENGAN BIM TERHADAP EFISIENSI BIAYA, MUTU, WAKTU","year":2021,"lang":"id","type":"article","venue":"Construction and Material Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Humanities; Physics; Art","score_opus":0.009545628354322693,"score_gpt":0.2043541926168292,"score_spread":0.1948085642625065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155372619","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11271059,0.005469776,0.62394536,0.0027668318,0.0010985144,0.00048081152,0.00121095,0.0071887197,0.24512847],"genre_scores_gemma":[0.54898447,0.00523962,0.25738886,0.0009651083,0.0002777657,0.0006382578,0.0016687682,0.0021813735,0.1826558],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9978416,0.00031469748,0.00013333709,0.0003351514,0.0011625777,0.00021255006],"domain_scores_gemma":[0.99860746,0.0002762818,0.00011817547,0.00028921355,0.000597859,0.00011101473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016871507,0.0015433186,0.0009490891,0.0016811267,0.0015867883,0.0046140724,0.0014309317,0.0015754708,0.02812976],"category_scores_gemma":[0.0023168381,0.0008093004,0.0008873246,0.0016722254,0.0010389794,0.004183952,0.0035827344,0.0014454762,0.009804168],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005491676,0.0003067055,0.0058137714,0.0019361993,0.00009551762,0.0007816203,0.0030767713,0.0094174165,0.12538566,0.033812467,0.017944574,0.8008802],"study_design_scores_gemma":[0.00008502584,0.0008482368,0.019580603,0.0009337366,0.00034215907,0.0026947001,0.00537024,0.03831252,0.1393907,0.028078012,0.76405823,0.00030580282],"about_ca_topic_score_codex":0.0027597148,"about_ca_topic_score_gemma":0.003956142,"teacher_disagreement_score":0.02812976,"about_ca_system_score_codex":0.0009435383,"about_ca_system_score_gemma":0.0017550897,"threshold_uncertainty_score":0.094103396},"labels":[],"label_agreement":null},{"id":"W3155731923","doi":"","title":"THE INCLUSION OF INDIVIDUALS WITH COLOUR VISION DEFICIENCIES","year":2016,"lang":"en","type":"article","venue":"TSpace (University of Toronto)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Inclusion (mineral); Artificial intelligence; Computer science; Psychology; Social psychology","score_opus":0.00529960363153216,"score_gpt":0.19050368911441531,"score_spread":0.18520408548288314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3155731923","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7930804,0.0015229761,0.01370785,0.007819627,0.0017487928,0.0013009146,0.0070937183,0.0004727484,0.1732531],"genre_scores_gemma":[0.89121324,0.0006976048,0.013703981,0.002372794,0.00018596879,0.0009125647,0.0028017173,0.00030313482,0.0878091],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.996095,0.000849953,0.0005105112,0.0006573856,0.0011518842,0.0007352652],"domain_scores_gemma":[0.98567826,0.0035440447,0.0016251929,0.0033516567,0.004583134,0.0012177426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041069426,0.00045708928,0.0005392889,0.0028070589,0.0029259876,0.002602388,0.0010772066,0.0010591253,0.04477502],"category_scores_gemma":[0.02811355,0.00024428032,0.0005049264,0.0024871542,0.0010680774,0.0025510192,0.003846428,0.00082236365,0.0072163097],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016854285,0.000713704,0.32675406,0.0014003649,0.00011223884,0.013420362,0.034777626,0.0003935138,0.0062434115,0.024367575,0.10724828,0.48288345],"study_design_scores_gemma":[0.00012174375,0.00046330242,0.19546394,0.0027381885,0.00050195743,0.043318115,0.03830791,0.001667674,0.009983006,0.027575979,0.6796584,0.00019976897],"about_ca_topic_score_codex":0.009133047,"about_ca_topic_score_gemma":0.01289552,"teacher_disagreement_score":0.04477502,"about_ca_system_score_codex":0.0010445043,"about_ca_system_score_gemma":0.0041117216,"threshold_uncertainty_score":0.1497873},"labels":[],"label_agreement":null},{"id":"W3156968881","doi":"10.1139/cjce-2020-0762","title":"Digitalization Opportunities Road Mapping Tool (DORMT©): A framework to assess digitalization opportunities in construction organizations","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta; Canadian Natural Resources","funders":"","keywords":"Judgement; Process management; Rank (graph theory); Knowledge management; Computer science; Engineering management; Engineering","score_opus":0.031433220750274805,"score_gpt":0.20319197925005075,"score_spread":0.17175875849977595,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3156968881","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13576956,0.0003132295,0.76759845,0.0012075021,0.00008043977,0.002135991,0.0057324297,0.005336678,0.08182579],"genre_scores_gemma":[0.35902444,0.0001972409,0.6324933,0.00008682238,0.000012440154,0.0016848342,0.0027548713,0.00023643991,0.0035095897],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99663585,0.0013086911,0.00038452228,0.00023458885,0.0011264369,0.00030996042],"domain_scores_gemma":[0.9929724,0.0033288153,0.0011709337,0.00040633426,0.0017874822,0.0003340031],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005299426,0.0009258056,0.00045300688,0.014030079,0.001290421,0.0039841034,0.0011633975,0.0009731886,0.0066444012],"category_scores_gemma":[0.014802839,0.00042664932,0.00096380664,0.004430138,0.0011111235,0.0052786293,0.004030504,0.0009219351,0.0008684952],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031521326,0.00070870045,0.037339624,0.0015457763,0.00017753249,0.0005888352,0.013185284,0.06310598,0.009510142,0.22381175,0.028498704,0.62121236],"study_design_scores_gemma":[0.0001802287,0.00096335384,0.059141334,0.0022642931,0.00027100206,0.0011297333,0.028758347,0.43055823,0.02062095,0.21609937,0.23931462,0.000698586],"about_ca_topic_score_codex":0.009367986,"about_ca_topic_score_gemma":0.012826326,"teacher_disagreement_score":0.014030079,"about_ca_system_score_codex":0.0023438793,"about_ca_system_score_gemma":0.0035956658,"threshold_uncertainty_score":0.028026342},"labels":[],"label_agreement":null},{"id":"W3158234369","doi":"10.19255/jmpm02511","title":"Exploring the Influence of Risks in BIM Implementation: A Review Exploring BIM Critical Success Factors and BIM Implementation Phases","year":2021,"lang":"en","type":"review","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Building information modeling; Interoperability; Risk analysis (engineering); Process management; Risk management; Computer science; Interface (matter); Knowledge management; Business; Engineering; Operations management","score_opus":0.18653038775283998,"score_gpt":0.41543041067447434,"score_spread":0.22890002292163436,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158234369","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00038479615,0.9988105,0.00012347136,0.00021427203,0.000046938247,0.000008052341,0.000019763746,0.0000024124543,0.00038969622],"genre_scores_gemma":[0.002968451,0.99655235,0.00022851567,0.00010794902,0.000035787474,0.000013374498,0.000023653218,0.0000013718701,0.000068486275],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99786735,0.0006545861,0.0005731226,0.00025962258,0.0005763462,0.000068902125],"domain_scores_gemma":[0.9801895,0.01566453,0.0016932406,0.00020808136,0.0020699585,0.00017465567],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0037642783,0.0009167437,0.0016732527,0.010840427,0.0005415985,0.0022574102,0.0009486742,0.0014001842,0.0018992128],"category_scores_gemma":[0.012571813,0.00063413783,0.0014506709,0.011773088,0.00082834077,0.0025174697,0.00095089164,0.0010548874,0.00039380227],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007303987,0.00008068517,0.0020185513,0.24426484,0.0007670951,0.00028116725,0.0010634721,0.00034683448,0.0005895956,0.003300842,0.0057258923,0.74148786],"study_design_scores_gemma":[0.000026946653,0.00027602585,0.015491676,0.37139675,0.006474281,0.0027062455,0.0027728265,0.00031543575,0.0014504171,0.0036891599,0.5952867,0.00011348927],"about_ca_topic_score_codex":0.0055565005,"about_ca_topic_score_gemma":0.011443988,"teacher_disagreement_score":0.010840427,"about_ca_system_score_codex":0.001600405,"about_ca_system_score_gemma":0.007813755,"threshold_uncertainty_score":0.019907594},"labels":[],"label_agreement":null},{"id":"W3158653109","doi":"10.1155/2021/5554551","title":"Design for Manufacturing and Assembly: A BIM‐Enabled Generative Framework for Building Panelization Design","year":2021,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":41,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Generative grammar; Generative Design; Manufacturing engineering; Engineering drawing; Architectural engineering; Construction engineering; Computer science; Design elements and principles; Engineering; Software engineering; Operations management; Artificial intelligence","score_opus":0.016603959134953,"score_gpt":0.24767472843085442,"score_spread":0.23107076929590142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3158653109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019430638,0.00010226272,0.9933883,0.00006692229,0.0000115993325,0.00007378151,0.0000930928,0.0004918296,0.0038291258],"genre_scores_gemma":[0.07835496,0.00030071926,0.91819835,0.000043941916,0.000009094844,0.00035553955,0.0005984869,0.0002517931,0.0018870755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99915135,0.00030620274,0.000042360374,0.00009531803,0.00034130597,0.00006335202],"domain_scores_gemma":[0.9995629,0.00018727792,0.000035608195,0.00009586097,0.000088845314,0.000029431712],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014714404,0.0013481433,0.0006019323,0.0015364981,0.00074526086,0.0020467357,0.0020028746,0.0012693626,0.0042123846],"category_scores_gemma":[0.0017127107,0.00085023796,0.0020731585,0.0010374705,0.0014977405,0.001126008,0.0020319112,0.0012458544,0.0010169569],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028924906,0.00007131379,0.0007680812,0.00020228972,0.000046517045,0.00020558998,0.00042710485,0.80619925,0.004393155,0.13049123,0.0020104144,0.05515614],"study_design_scores_gemma":[0.000012953915,0.000021932601,0.00014517047,0.000056210512,0.00001709351,0.000078554374,0.00006409202,0.9543749,0.0017166716,0.024995863,0.018498635,0.000017815797],"about_ca_topic_score_codex":0.006528859,"about_ca_topic_score_gemma":0.009815122,"teacher_disagreement_score":0.006528859,"about_ca_system_score_codex":0.0011508348,"about_ca_system_score_gemma":0.0014424126,"threshold_uncertainty_score":0.01409179},"labels":[],"label_agreement":null},{"id":"W3160008510","doi":"10.1108/ecam-11-2020-0986","title":"A BIM-lean framework for digitalisation of premanufacturing phases in offsite construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":68,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Building information modeling; Context (archaeology); Lean construction; Procurement; Systems engineering; Engineering; Process management; Computer science; Modular design; Bidding; Construction engineering; Construction industry; Operations management; Business","score_opus":0.006971102520801377,"score_gpt":0.20443454892908347,"score_spread":0.1974634464082821,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3160008510","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010453044,0.0006557816,0.9688891,0.0010054904,0.000053187272,0.0006268191,0.0002912087,0.00038321156,0.017642196],"genre_scores_gemma":[0.16933538,0.0006680654,0.8269354,0.00011255213,0.000017385173,0.000593092,0.0004669269,0.000052337058,0.0018188484],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99401593,0.0030839886,0.00042836054,0.00046026072,0.0016973581,0.0003141248],"domain_scores_gemma":[0.99743205,0.00092762307,0.00041362474,0.00038896824,0.00067133247,0.00016637781],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006889272,0.0013861788,0.00057806337,0.00581868,0.001475773,0.0051150564,0.0024763506,0.0013601617,0.0031285016],"category_scores_gemma":[0.0053332197,0.00061420817,0.0012450336,0.0043959497,0.0025452867,0.0040448722,0.0043738666,0.0015655004,0.00065981236],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008173505,0.00039216178,0.005444002,0.00077201874,0.000064286316,0.00044725375,0.00207241,0.23005474,0.0030931784,0.5545095,0.003089832,0.19997881],"study_design_scores_gemma":[0.000051853753,0.00036374707,0.0058880486,0.0018660534,0.000115648254,0.00064168294,0.004896417,0.5237022,0.008267586,0.33044958,0.123585664,0.00017154771],"about_ca_topic_score_codex":0.00929457,"about_ca_topic_score_gemma":0.013147879,"teacher_disagreement_score":0.00929457,"about_ca_system_score_codex":0.005008378,"about_ca_system_score_gemma":0.00782458,"threshold_uncertainty_score":0.036434352},"labels":[],"label_agreement":null},{"id":"W3161035279","doi":"10.1088/1757-899x/989/1/012001","title":"Status of building information modelling (BIM) in construction practice-UK context","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Anglia Ruskin University","keywords":"Building information modeling; Construction industry; Context (archaeology); Process (computing); Business; Building construction; Construction engineering; Questionnaire; Process management; Knowledge management; Engineering management; Architectural engineering; Engineering; Operations management; Computer science; Sociology","score_opus":0.0174436461093593,"score_gpt":0.21036165473288165,"score_spread":0.19291800862352235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3161035279","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80417496,0.050158124,0.0030347866,0.038945623,0.00036136308,0.00005890295,0.0005128267,0.0000622468,0.10269124],"genre_scores_gemma":[0.9867209,0.0106463395,0.0007039274,0.00065771694,0.00003591856,0.000019473277,0.00008117441,0.000007694367,0.0011269043],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9892426,0.0049575535,0.0010258539,0.000872809,0.0024677133,0.0014334257],"domain_scores_gemma":[0.9802659,0.010040529,0.0034505306,0.0009628131,0.0041578873,0.0011222903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073123523,0.00026008053,0.00044359273,0.0022326473,0.0019306182,0.008558364,0.00081194215,0.0015780922,0.0064098616],"category_scores_gemma":[0.013087195,0.0003747742,0.0001766412,0.007500496,0.006323524,0.004670916,0.0057890713,0.0015562411,0.0004678689],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00057844,0.00037391033,0.14404604,0.0070226737,0.00007686566,0.0034875954,0.14439707,0.0029224106,0.003511841,0.12074767,0.017047124,0.5557884],"study_design_scores_gemma":[0.000039892006,0.0004158861,0.3617781,0.008738472,0.00007187173,0.0022409242,0.21683674,0.001843153,0.001555905,0.010301898,0.39599395,0.00018320684],"about_ca_topic_score_codex":0.074698046,"about_ca_topic_score_gemma":0.0678955,"teacher_disagreement_score":0.074698046,"about_ca_system_score_codex":0.012623522,"about_ca_system_score_gemma":0.0064394814,"threshold_uncertainty_score":0.14852649},"labels":[],"label_agreement":null},{"id":"W3163887902","doi":"","title":"Construction Management Project Delivery Method: A Case Study of the Centre Block Rehabilitation Project","year":2021,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Rehabilitation; Project management; Block (permutation group theory); Engineering; Construction engineering; Engineering management; Operations management; Medicine; Systems engineering; Physical therapy; Mathematics","score_opus":0.007999340084644273,"score_gpt":0.21168987977283335,"score_spread":0.20369053968818907,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163887902","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93385214,0.0007158572,0.014138076,0.005347758,0.00008282043,0.0010589758,0.00024186634,0.00008627589,0.044476245],"genre_scores_gemma":[0.9597061,0.0011898878,0.014482873,0.00075788813,0.000033084918,0.00064951135,0.00014077895,0.00011691494,0.022922948],"study_design_codex":"qualitative","study_design_gemma":"case_report","domain_scores_codex":[0.98871684,0.007290615,0.00031909347,0.0005237009,0.0018668359,0.0012829504],"domain_scores_gemma":[0.9932066,0.0032443802,0.00072895,0.0003607109,0.0010608021,0.0013985207],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008293092,0.0006175269,0.00049058377,0.0022121514,0.012528628,0.003898091,0.002634137,0.0031847353,0.005701078],"category_scores_gemma":[0.012036449,0.0006487843,0.0004228923,0.0029947164,0.0037198616,0.0026207503,0.0037354433,0.0025777747,0.0012501898],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003578852,0.0036244604,0.041160706,0.0011901285,0.00006104054,0.053123157,0.6707447,0.0040519745,0.0054097963,0.041027762,0.020458959,0.15878943],"study_design_scores_gemma":[0.00006500479,0.0010553065,0.026741192,0.0007409514,0.000032954198,0.009259923,0.7935986,0.0048297555,0.0020488752,0.0029021676,0.15863083,0.0000943416],"about_ca_topic_score_codex":0.040621515,"about_ca_topic_score_gemma":0.10394485,"teacher_disagreement_score":0.9593785,"about_ca_system_score_codex":0.009401445,"about_ca_system_score_gemma":0.010314933,"threshold_uncertainty_score":0.080770135},"labels":[],"label_agreement":null},{"id":"W3163912362","doi":"","title":"Building SMARTer : an introduction to open BIM as the foundation for a Canadian National BIM Standard","year":2018,"lang":"en","type":"article","venue":"Espace ÉTS (ETS)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"National standard; Foundation (evidence); Building information modeling; Engineering; Architectural engineering; Construction engineering; Political science; Operations management; Law","score_opus":0.012393464637209719,"score_gpt":0.26805843450365735,"score_spread":0.25566496986644766,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3163912362","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005157033,0.034357455,0.42237657,0.03291734,0.007066358,0.00061459746,0.0020405788,0.0033752497,0.49209484],"genre_scores_gemma":[0.056075886,0.059457626,0.44627306,0.0068537886,0.00244662,0.00041514344,0.0026309674,0.0034657172,0.4223813],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99545383,0.0004062487,0.00021259038,0.000357741,0.0029962356,0.0005734403],"domain_scores_gemma":[0.99763644,0.00038740408,0.000064240405,0.00017765294,0.0014374588,0.00029684216],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0056414995,0.0014164223,0.0006354086,0.0055308407,0.0034582138,0.009417006,0.0032540963,0.0037228046,0.014287802],"category_scores_gemma":[0.0048817676,0.0011879072,0.0008560361,0.0063409554,0.0077782357,0.007926002,0.00452243,0.0057379403,0.00444504],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019038405,0.000056271652,0.00038214252,0.00022316934,0.000008058125,0.00017291514,0.0017597902,0.0030678425,0.0018214594,0.7470342,0.09496683,0.15048833],"study_design_scores_gemma":[0.0000017523416,0.000010873125,0.00057006895,0.00016918418,0.000004343822,0.000110917084,0.00037176194,0.0024158733,0.00052050955,0.0283296,0.96744174,0.000053332104],"about_ca_topic_score_codex":0.6800183,"about_ca_topic_score_gemma":0.80098814,"teacher_disagreement_score":0.97057766,"about_ca_system_score_codex":0.029422315,"about_ca_system_score_gemma":0.032312408,"threshold_uncertainty_score":0.64373225},"labels":[],"label_agreement":null},{"id":"W3165117314","doi":"10.3389/fbuil.2021.612668","title":"Cybersecurity in Construction: Where Do We Stand and How Do We Get Better Prepared","year":2021,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"York University; New York University Abu Dhabi","keywords":"Domain (mathematical analysis); Computer security; Engineering; Architecture; Computer science; Engineering management","score_opus":0.004494003992980958,"score_gpt":0.17274716502923926,"score_spread":0.16825316103625831,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165117314","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10940516,0.11401356,0.015115382,0.6167334,0.007667355,0.00023605506,0.00076409307,0.0005168041,0.1355483],"genre_scores_gemma":[0.85619587,0.07800856,0.011364785,0.03245182,0.0016419232,0.0002454459,0.00069937896,0.00053301884,0.018859215],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98226845,0.007609196,0.00075054925,0.001451965,0.004817576,0.0031022965],"domain_scores_gemma":[0.9729413,0.007585461,0.003818279,0.0017293298,0.0068627624,0.007062903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01630218,0.000998294,0.0010902898,0.0054344535,0.013963685,0.025262764,0.0020720116,0.005033025,0.016756263],"category_scores_gemma":[0.043381456,0.0007125153,0.0009394465,0.007870195,0.020290254,0.035465643,0.013652964,0.007880106,0.004697536],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015100293,0.00031860292,0.09055949,0.0041219024,0.00018239809,0.00081074744,0.105439305,0.00089674396,0.0010674422,0.15320678,0.19564532,0.4476003],"study_design_scores_gemma":[0.000018697761,0.00013177951,0.043477498,0.0069481614,0.000080494225,0.00062022026,0.1822727,0.00046627756,0.00088681275,0.064194895,0.7007254,0.00017704551],"about_ca_topic_score_codex":0.019607076,"about_ca_topic_score_gemma":0.02927976,"teacher_disagreement_score":0.025262764,"about_ca_system_score_codex":0.012767942,"about_ca_system_score_gemma":0.03026308,"threshold_uncertainty_score":0.092638314},"labels":[],"label_agreement":null},{"id":"W3165549301","doi":"10.11159/iccste21.147","title":"A Methodology Proposal of an Accessible Design for an UrbanIntersection to Improve Mobility of People with Physical Disabilities","year":2021,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Intersection (aeronautics); Computer science; Transport engineering; Engineering","score_opus":0.03044178241201941,"score_gpt":0.26549018369222477,"score_spread":0.23504840128020535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3165549301","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004910587,0.00011256338,0.9790419,0.0005167137,0.00006373091,0.0012642421,0.00017639749,0.00037159503,0.013542296],"genre_scores_gemma":[0.046955753,0.0001573476,0.94706386,0.00009389706,0.000008813586,0.0016415647,0.00025619759,0.000053756605,0.0037687207],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9944946,0.0027479213,0.0003615195,0.0007145819,0.0014574934,0.0002239615],"domain_scores_gemma":[0.9967296,0.0008335654,0.00020193428,0.00043695886,0.0016020512,0.00019580935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063360087,0.00104138,0.00037656393,0.002627897,0.001567429,0.0039047252,0.0019420718,0.0013910804,0.006126705],"category_scores_gemma":[0.0057195444,0.0004934641,0.0011661162,0.0015193346,0.0020064607,0.0025112294,0.0027794933,0.00089030986,0.0010301803],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011072694,0.0003883276,0.00583544,0.001501174,0.00007826432,0.0004965967,0.008874289,0.02429514,0.010718195,0.6167217,0.007818052,0.32316205],"study_design_scores_gemma":[0.00024150252,0.0010924042,0.0057768677,0.0018179924,0.00028281615,0.0013498651,0.013331652,0.1547234,0.017115042,0.26850075,0.53559023,0.00017756372],"about_ca_topic_score_codex":0.0035632267,"about_ca_topic_score_gemma":0.0045345193,"teacher_disagreement_score":0.0063360087,"about_ca_system_score_codex":0.0021223298,"about_ca_system_score_gemma":0.008593208,"threshold_uncertainty_score":0.03350836},"labels":[],"label_agreement":null},{"id":"W3166475402","doi":"10.1155/2021/9953732","title":"A Dynamic Just‐in‐Time Component Delivery Framework for Off‐Site Construction","year":2021,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick","funders":"","keywords":"Component (thermodynamics); Computer science; Physics","score_opus":0.004130429474527127,"score_gpt":0.2135312342633691,"score_spread":0.20940080478884196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3166475402","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003711053,0.00029961203,0.9835278,0.00014805951,0.000060036127,0.00007254693,0.000071576425,0.00022331964,0.011885991],"genre_scores_gemma":[0.46580192,0.0016107636,0.49788693,0.00013574853,0.00009378497,0.00056061626,0.00040973257,0.0004310633,0.033069484],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998776,0.00033589918,0.000054761498,0.0002393075,0.0004080031,0.00018593206],"domain_scores_gemma":[0.99954563,0.00014139891,0.00006931438,0.00005448258,0.00012483029,0.00006417768],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001296702,0.0014344786,0.00085000956,0.0009145875,0.0008481664,0.0023983857,0.0032300071,0.0015813457,0.009438857],"category_scores_gemma":[0.0014303242,0.00084705587,0.0014935903,0.0012495231,0.001195223,0.002179968,0.0022320154,0.001645239,0.001657366],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052526826,0.00006400661,0.00028150986,0.00013984609,0.000025534306,0.00032392255,0.00014910253,0.80020183,0.0028911626,0.16747063,0.0017317331,0.026668226],"study_design_scores_gemma":[0.000014553095,0.000044779987,0.000090911584,0.000019808578,0.000019729132,0.000084043786,0.000035507222,0.97040594,0.0004693061,0.01981106,0.00898742,0.000016986081],"about_ca_topic_score_codex":0.010453272,"about_ca_topic_score_gemma":0.007353417,"teacher_disagreement_score":0.010453272,"about_ca_system_score_codex":0.001956086,"about_ca_system_score_gemma":0.003154582,"threshold_uncertainty_score":0.031576097},"labels":[],"label_agreement":null},{"id":"W3167790180","doi":"10.1108/ecam-12-2020-1060","title":"Mixed qualitative–quantitative approach for bidding decisions in construction","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Bidding; Computer science; Quantitative analysis (chemistry); Decision support system; Reuse; Qualitative property; Operations research; Management science; Knowledge management; Data mining; Machine learning; Business; Engineering; Marketing","score_opus":0.02858960551835073,"score_gpt":0.2619158157200169,"score_spread":0.23332621020166613,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3167790180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020093078,0.00025184103,0.9657578,0.00047360998,0.00004258236,0.00041970547,0.00012769063,0.000099215744,0.0127344895],"genre_scores_gemma":[0.4612977,0.00024412012,0.5349624,0.00015460586,0.000026262587,0.0007227738,0.000111632115,0.000039012164,0.0024414575],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9850675,0.010762229,0.0005423906,0.0007085673,0.0026331502,0.00028625363],"domain_scores_gemma":[0.9831907,0.01207778,0.0013095337,0.0006618374,0.0023517753,0.00040832546],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012613513,0.0011777394,0.0007897689,0.0034270575,0.0010827462,0.004183509,0.0021036253,0.0010645868,0.0052434406],"category_scores_gemma":[0.020692758,0.0007124063,0.0013172997,0.0022436355,0.0018604004,0.0029473451,0.0024046758,0.0014557823,0.0005927351],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004198886,0.00061403203,0.011732491,0.0013246243,0.0004629431,0.0010408494,0.0065071178,0.38467225,0.0064587737,0.36902094,0.0026471613,0.21509895],"study_design_scores_gemma":[0.00004714835,0.00027019446,0.0021385294,0.0002323992,0.00011051038,0.00027276456,0.002880037,0.8189739,0.0017769937,0.1644198,0.008760138,0.00011756747],"about_ca_topic_score_codex":0.0045341123,"about_ca_topic_score_gemma":0.007238912,"teacher_disagreement_score":0.012613513,"about_ca_system_score_codex":0.0036669613,"about_ca_system_score_gemma":0.0038060648,"threshold_uncertainty_score":0.06670749},"labels":[],"label_agreement":null},{"id":"W3168304808","doi":"10.1108/ecam-10-2020-0810","title":"Formalizing knowledge representation in earthwork operations through development of domain ontology","year":2021,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Earthworks; Computer science; Context (archaeology); Domain (mathematical analysis); Interoperability; Software engineering; Engineering; World Wide Web; Mathematics","score_opus":0.010687857085148515,"score_gpt":0.22995428899990153,"score_spread":0.219266431914753,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3168304808","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006860312,0.00042944902,0.97522426,0.0014364979,0.00007683951,0.00034642222,0.00036053074,0.00034366277,0.014922088],"genre_scores_gemma":[0.116499625,0.0010410058,0.8768278,0.00032812761,0.000046558504,0.0005609013,0.0015068644,0.00009916693,0.0030899793],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99392116,0.0027224608,0.00093369564,0.00077190687,0.0012653182,0.00038556292],"domain_scores_gemma":[0.9946307,0.0025533827,0.0006176323,0.0012504596,0.0007642984,0.000183569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008011596,0.00073995715,0.00063773344,0.0048712087,0.0021158264,0.007447988,0.0025499493,0.0014291554,0.002288305],"category_scores_gemma":[0.00930555,0.0006131784,0.0019522439,0.004522005,0.0048469063,0.012318869,0.005336532,0.002950686,0.0005081972],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017115333,0.00006208327,0.0009091646,0.00030058308,0.000039043676,0.00041086052,0.0034883684,0.012045165,0.0012639232,0.9328982,0.001899673,0.04666574],"study_design_scores_gemma":[0.000037204998,0.000049515376,0.0011776163,0.0016152863,0.00009939716,0.0006976387,0.007097649,0.08368755,0.0040056542,0.69940716,0.20204017,0.00008527899],"about_ca_topic_score_codex":0.016769223,"about_ca_topic_score_gemma":0.012113509,"teacher_disagreement_score":0.016769223,"about_ca_system_score_codex":0.0028672596,"about_ca_system_score_gemma":0.007277441,"threshold_uncertainty_score":0.042369843},"labels":[],"label_agreement":null},{"id":"W3169345524","doi":"10.3390/laws10020043","title":"Building Information Modeling in Quebec’s Procurement for Public Infrastructure: A Case for Integrated Project Delivery","year":2021,"lang":"en","type":"article","venue":"Laws","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Building information modeling; Normative; Process (computing); Business; Adjudication; Integrated project delivery; Legislation; Process management; Legislature; Risk analysis (engineering); Computer science; Operations management; Engineering; Marketing; Construction management; Law","score_opus":0.02299288409809637,"score_gpt":0.2351190224829935,"score_spread":0.21212613838489713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169345524","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5862022,0.00092244614,0.024784483,0.025061943,0.00009355599,0.0005664105,0.00035879947,0.00015548378,0.36185464],"genre_scores_gemma":[0.9488595,0.00028426378,0.0072351787,0.0007639318,0.000011565416,0.00010055728,0.00010331724,0.000028449034,0.042613186],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99661887,0.0010975719,0.00006311183,0.00020655559,0.0007853986,0.001228409],"domain_scores_gemma":[0.99684566,0.0010289851,0.00012968857,0.00021482492,0.0011786334,0.000602307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036237026,0.00047012567,0.00027554852,0.0010822038,0.01214935,0.0062080957,0.0020509816,0.0036082356,0.0073953373],"category_scores_gemma":[0.0042567593,0.00041376374,0.0006429165,0.0018385218,0.0042643533,0.0018027982,0.0027849015,0.0019530831,0.0005280972],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025508256,0.00080196006,0.042019222,0.00026031514,0.00007776975,0.031977534,0.040886357,0.054394968,0.006208067,0.6993464,0.027859196,0.095913164],"study_design_scores_gemma":[0.00029641,0.00043857386,0.058829863,0.00079221366,0.00019705732,0.004904757,0.12032451,0.17069432,0.004627969,0.035345472,0.6032264,0.00032242638],"about_ca_topic_score_codex":0.9717039,"about_ca_topic_score_gemma":0.97958714,"teacher_disagreement_score":0.91569304,"about_ca_system_score_codex":0.084306926,"about_ca_system_score_gemma":0.06014013,"threshold_uncertainty_score":0.6116924},"labels":[],"label_agreement":null},{"id":"W3169371903","doi":"10.5430/ijhe.v10n6p57","title":"Computing Competency for Civil Engineering Graduates: Recent Updates and Developments in Saudi Arabia and the US","year":2021,"lang":"en","type":"article","venue":"International Journal of Higher Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Curriculum; Engineering education; Engineering management; Informatics engineering; Computer science; Civil engineering; Engineering; Mechanical engineering; Political science; Law","score_opus":0.008227102617932623,"score_gpt":0.24536778838991935,"score_spread":0.23714068577198671,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3169371903","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.87120396,0.06416263,0.0009461559,0.026582768,0.0009034881,0.000060375187,0.0026407645,0.000073038376,0.033426717],"genre_scores_gemma":[0.9589997,0.03198781,0.0010191114,0.0016200767,0.00025898867,0.000021057584,0.0012650383,0.000017711916,0.0048105298],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989255,0.00011516742,0.00013151931,0.00012663464,0.00050916505,0.00019205292],"domain_scores_gemma":[0.9911084,0.0011118632,0.0016344112,0.00011130998,0.0046982397,0.0013357821],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018098466,0.0002611114,0.00018900441,0.0034057784,0.00056212937,0.0018098268,0.0004011853,0.00044481817,0.003041199],"category_scores_gemma":[0.0061890204,0.00011409856,0.00017408277,0.004307708,0.00060522027,0.00131816,0.0010653519,0.0007118854,0.000420382],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015695642,0.0002222062,0.37197343,0.0011675429,0.000033294524,0.00037333803,0.0064177667,0.0004116698,0.0013217075,0.004276235,0.018171147,0.5954748],"study_design_scores_gemma":[0.0000067545066,0.00013918774,0.85574806,0.0006541912,0.000029288045,0.00059666554,0.01400644,0.0004434097,0.0012317981,0.00031767128,0.12679419,0.00003246743],"about_ca_topic_score_codex":0.053151675,"about_ca_topic_score_gemma":0.05628817,"teacher_disagreement_score":0.053151675,"about_ca_system_score_codex":0.00409586,"about_ca_system_score_gemma":0.0043606716,"threshold_uncertainty_score":0.10568458},"labels":[],"label_agreement":null},{"id":"W3177167349","doi":"10.1109/icitm52822.2021.00010","title":"The Formation of Clusters for the Assignment of Multiple Project Managers Problem","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Bridge (graph theory); Project portfolio management; Dependency (UML); Portfolio; Computer science; Project manager; Project management; Design structure matrix; Operations research; Software engineering; Systems engineering; Engineering; Business","score_opus":0.013155508905857252,"score_gpt":0.21259234218671086,"score_spread":0.1994368332808536,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3177167349","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013807437,0.00005997148,0.982467,0.00028069457,0.00001954639,0.0001584872,0.00006490093,0.00007982365,0.0030621751],"genre_scores_gemma":[0.24641965,0.00019588188,0.7465732,0.000089677924,0.00007864272,0.00085278274,0.00029485187,0.00015621026,0.0053390805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99645233,0.0019196251,0.00014244173,0.00068547454,0.00046752347,0.00033261732],"domain_scores_gemma":[0.9919801,0.005826321,0.00063709397,0.00050508685,0.0007127435,0.00033868087],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004796421,0.001205956,0.0011676863,0.0014594828,0.0014347716,0.0019499543,0.002007219,0.0015179139,0.0058679585],"category_scores_gemma":[0.015397304,0.0009208078,0.0016824814,0.0016544226,0.0022270891,0.0025359702,0.002723397,0.0028164848,0.0005710078],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022682233,0.00018235717,0.0024758475,0.00024917972,0.0001244828,0.00017667265,0.0008334096,0.6781789,0.0014310726,0.2567997,0.0040227426,0.055298727],"study_design_scores_gemma":[0.00003406282,0.000059549788,0.0005522552,0.000029398789,0.000028381977,0.000050098384,0.00022480391,0.86221254,0.000779837,0.13264808,0.0033523503,0.000028628378],"about_ca_topic_score_codex":0.006562365,"about_ca_topic_score_gemma":0.0045737014,"teacher_disagreement_score":0.006562365,"about_ca_system_score_codex":0.0018978394,"about_ca_system_score_gemma":0.0028499274,"threshold_uncertainty_score":0.025366187},"labels":[],"label_agreement":null},{"id":"W3177629667","doi":"10.5430/ijhe.v11n1p31","title":"Introducing BIM in Curricular Programs of Civil Engineering","year":2021,"lang":"en","type":"article","venue":"International Journal of Higher Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bachelor; Building information modeling; Architecture; Principal (computer security); Engineering; Engineering management; Engineering ethics; Engineering education; Subject (documents); Construction engineering; Computer science; Political science; Library science","score_opus":0.005290554951063708,"score_gpt":0.23987252878361337,"score_spread":0.23458197383254967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3177629667","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90600747,0.0036143393,0.023500625,0.0023122032,0.0004012774,0.002021857,0.001400161,0.00036508212,0.06037709],"genre_scores_gemma":[0.8916521,0.0021467756,0.07058752,0.0007722085,0.000121765974,0.0016561403,0.0016511908,0.000082438295,0.03132985],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99785113,0.0006889394,0.00016208897,0.00032007144,0.00057626376,0.00040149936],"domain_scores_gemma":[0.99434185,0.0016481089,0.0006475407,0.00039367462,0.0015738382,0.0013950457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027103224,0.00038596627,0.00031638774,0.0027802244,0.0012469793,0.0017260966,0.0005955594,0.0005240998,0.009745819],"category_scores_gemma":[0.0071583744,0.00023508763,0.00024254552,0.0030154912,0.00050139456,0.0007955157,0.0026107074,0.0006672057,0.0019005528],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027729778,0.0032571945,0.10612269,0.0011716561,0.000016035341,0.00019077619,0.011229635,0.0014292368,0.0058230027,0.009111501,0.008371161,0.85299987],"study_design_scores_gemma":[0.000074139956,0.0021049858,0.6100659,0.0022152422,0.000063388725,0.00069304067,0.024446307,0.0024950607,0.01591307,0.008609495,0.33323714,0.00008231902],"about_ca_topic_score_codex":0.0010489853,"about_ca_topic_score_gemma":0.0037984306,"teacher_disagreement_score":0.009745819,"about_ca_system_score_codex":0.0022000137,"about_ca_system_score_gemma":0.0063730213,"threshold_uncertainty_score":0.032602966},"labels":[],"label_agreement":null},{"id":"W3178654013","doi":"10.3390/buildings11070291","title":"A Taxonomy of Sources of Waste in BIM Information Flows","year":2021,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Taxonomy (biology); Design science research; Computer science; Process (computing); Work (physics); Data science; Construction engineering; Systems engineering; Process management; Management science; Engineering; Knowledge management; Information system; Compatibility (geochemistry)","score_opus":0.007247556843511987,"score_gpt":0.17608787174049173,"score_spread":0.16884031489697973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3178654013","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16501902,0.005256143,0.7690748,0.0045503546,0.0001652725,0.0017937457,0.0014624323,0.0010327862,0.051645406],"genre_scores_gemma":[0.57503563,0.00619957,0.4036868,0.00063473143,0.000091537666,0.0024889342,0.0030223194,0.00051704113,0.008323487],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9584182,0.014852334,0.006723939,0.0019578398,0.01547792,0.0025697453],"domain_scores_gemma":[0.9478394,0.03065634,0.005782802,0.0061323904,0.008937479,0.0006516233],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020919893,0.0017008268,0.001200177,0.03481182,0.0055201375,0.015039613,0.0026854493,0.003968928,0.0035465015],"category_scores_gemma":[0.043200053,0.0015994293,0.0018651063,0.028393378,0.0071430695,0.028194705,0.010290851,0.0026321046,0.00075955153],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002205243,0.00017398695,0.02729111,0.0027766044,0.000113851354,0.0022302784,0.11839554,0.0076223924,0.0036944542,0.58620816,0.0038439424,0.24742918],"study_design_scores_gemma":[0.000060850372,0.0002589064,0.01658452,0.0072326935,0.00026624865,0.0068002013,0.108035654,0.033906214,0.012201498,0.5128839,0.30142972,0.0003395739],"about_ca_topic_score_codex":0.004389118,"about_ca_topic_score_gemma":0.0029122003,"teacher_disagreement_score":0.03481182,"about_ca_system_score_codex":0.0055887457,"about_ca_system_score_gemma":0.007373859,"threshold_uncertainty_score":0.110636294},"labels":[],"label_agreement":null},{"id":"W3180630644","doi":"10.1155/2021/6638236","title":"Building Information Modelling‐ (BIM‐) Based Generative Design for Drywall Installation Planning in Prefabricated Construction","year":2021,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":35,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Construction engineering; Architectural engineering; Computer science; Engineering; Civil engineering; Operations management","score_opus":0.014433801678058212,"score_gpt":0.2274941224769639,"score_spread":0.2130603207989057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3180630644","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.027427336,0.00019834361,0.962558,0.00011032727,0.000014620889,0.00014134239,0.000100893856,0.00043290883,0.009016217],"genre_scores_gemma":[0.4341002,0.00039297217,0.5625689,0.000046028024,0.000005446863,0.00035741882,0.0003402641,0.00017638945,0.002012308],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99879456,0.00053708075,0.000048976293,0.00010910339,0.00040229922,0.000108021784],"domain_scores_gemma":[0.9994228,0.0003039424,0.000057853398,0.00011286062,0.0000754652,0.000027094817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016172696,0.001008504,0.0006079235,0.0013800465,0.00067746727,0.0018717491,0.0011586447,0.0011098508,0.0032117912],"category_scores_gemma":[0.0017557816,0.0008520891,0.0013041184,0.0013052921,0.0009885578,0.0013127476,0.0020944134,0.0010156605,0.00055811915],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038631886,0.000075353026,0.0011265504,0.00012584645,0.000024465691,0.00013002289,0.00028912665,0.91838855,0.004263167,0.021679373,0.0005043026,0.053354554],"study_design_scores_gemma":[0.000014588119,0.000064644846,0.00063441216,0.00004874867,0.00002870012,0.00010217687,0.000142509,0.97644335,0.0040496187,0.011846567,0.0065922993,0.000032351425],"about_ca_topic_score_codex":0.0032731926,"about_ca_topic_score_gemma":0.007000722,"teacher_disagreement_score":0.0032731926,"about_ca_system_score_codex":0.0012319261,"about_ca_system_score_gemma":0.0016295849,"threshold_uncertainty_score":0.010744512},"labels":[],"label_agreement":null},{"id":"W3182197800","doi":"10.3390/a14070214","title":"Hybrid Artificial Intelligence HFS-RF-PSO Model for Construction Labor Productivity Prediction and Optimization","year":2021,"lang":"en","type":"article","venue":"Algorithms","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Random forest; Computer science; Feature selection; Selection (genetic algorithm); Artificial intelligence; Productivity; Mathematical optimization; Machine learning; Mathematics","score_opus":0.016254053047665435,"score_gpt":0.2224982946134684,"score_spread":0.20624424156580295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3182197800","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062051967,0.0005719947,0.9291872,0.00028536812,0.000072543975,0.00006386288,0.0001547382,0.00032318747,0.0072892434],"genre_scores_gemma":[0.9146566,0.000348062,0.080232345,0.0000857037,0.000046912606,0.00021061697,0.00023811309,0.000029398258,0.0041523934],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968266,0.00009040771,0.000018301698,0.000073957846,0.00009018321,0.000044449363],"domain_scores_gemma":[0.99976116,0.000116777155,0.00003216546,0.000014285932,0.00006342595,0.000012169004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00059891987,0.0007056164,0.00073293835,0.00069317623,0.00028854783,0.0007616567,0.0009631031,0.00075351796,0.0012609102],"category_scores_gemma":[0.00090553716,0.00031291458,0.0008557254,0.0007499858,0.00030886,0.00055129564,0.00050139433,0.0005181807,0.00019724386],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000235217,0.000034245873,0.0014445923,0.000028420245,0.00004766463,0.000028083461,0.00001579636,0.971556,0.00048968825,0.002037362,0.00041692052,0.023877734],"study_design_scores_gemma":[0.000002545181,0.0000125158895,0.00021134508,0.0000021125682,0.0000049743717,0.0000049493297,0.0000024666292,0.9991647,0.00007695172,0.0003579166,0.0001574556,0.000002112014],"about_ca_topic_score_codex":0.010797002,"about_ca_topic_score_gemma":0.0066301404,"teacher_disagreement_score":0.010797002,"about_ca_system_score_codex":0.0004681292,"about_ca_system_score_gemma":0.00079149194,"threshold_uncertainty_score":0.021468282},"labels":[],"label_agreement":null},{"id":"W3183380919","doi":"10.29173/mocs173","title":"Productivity-Based Management System for Offsite Manufacturing: Case Study of Noralta Lodge","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Duration (music); Modular design; Task (project management); Quality (philosophy); Engineering; Workforce; Project management; Control (management); Operations management; Construction management; Computer science; Civil engineering; Systems engineering","score_opus":0.017461549440775877,"score_gpt":0.2129587948924664,"score_spread":0.19549724545169053,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183380919","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9761579,0.00012978751,0.006422808,0.00029774779,0.000018084796,0.0003133174,0.00012529643,0.00022858416,0.016306577],"genre_scores_gemma":[0.9761614,0.00012247833,0.009666084,0.00005054902,0.000008072747,0.00008552723,0.00019424116,0.000040055616,0.013671709],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9990839,0.00026132283,0.000040718474,0.00014073573,0.00020768035,0.00026559122],"domain_scores_gemma":[0.9990054,0.00031065563,0.00008298125,0.00010653722,0.00017548242,0.00031891975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011258144,0.00047882274,0.00027951988,0.00066970265,0.002542083,0.0016005855,0.0018427655,0.001156267,0.003923118],"category_scores_gemma":[0.0013619686,0.00020699958,0.00031448534,0.00052652246,0.0009779386,0.0008353107,0.0014409203,0.00062320207,0.00066511414],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020481483,0.014026859,0.1653686,0.0015213413,0.00021056015,0.081410944,0.051471144,0.14221688,0.065270565,0.021110948,0.016684351,0.43865976],"study_design_scores_gemma":[0.0007176213,0.0072025657,0.21445058,0.0003939132,0.00023732375,0.0069134673,0.12337755,0.37018648,0.03978899,0.0053562555,0.23098311,0.000392118],"about_ca_topic_score_codex":0.07434038,"about_ca_topic_score_gemma":0.16016789,"teacher_disagreement_score":0.07434038,"about_ca_system_score_codex":0.0038685182,"about_ca_system_score_gemma":0.0027063529,"threshold_uncertainty_score":0.14781535},"labels":[],"label_agreement":null},{"id":"W3183638180","doi":"10.1108/sasbe-04-2021-0068","title":"A generative design approach for modular construction in congested urban areas","year":2021,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":38,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Modular design; Generative Design; Constructability; Systems engineering; Building information modeling; Computer science; Iterative design; Parametric design; Engineering design process; Modularity (biology); Engineering; Parametric statistics; Industrial engineering","score_opus":0.009990784575022924,"score_gpt":0.181723473065796,"score_spread":0.17173268849077308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3183638180","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008826852,0.000052677588,0.9785785,0.00007653952,0.000013383995,0.00015077688,0.000041201944,0.0002823469,0.011977655],"genre_scores_gemma":[0.19947642,0.00020205669,0.79421705,0.00007292871,0.000008414719,0.00052124273,0.00011395265,0.00017757349,0.0052103284],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989448,0.0004386935,0.000037182734,0.00012003007,0.00039300421,0.000066404966],"domain_scores_gemma":[0.9992354,0.0003271068,0.000069220405,0.00018181509,0.00014796482,0.000038595583],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018405172,0.00075366127,0.00030795086,0.0011531261,0.00077378115,0.0016658612,0.001467697,0.0007611651,0.0074482462],"category_scores_gemma":[0.0018540191,0.0005834256,0.0012308687,0.00094661023,0.0018367053,0.0009253677,0.002160027,0.0008974112,0.0008853821],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000073746254,0.00014273674,0.0032073762,0.0004992537,0.00006819373,0.00045131953,0.0024991652,0.563804,0.017012248,0.26170978,0.003041594,0.14749062],"study_design_scores_gemma":[0.00007477983,0.00034445335,0.0022031467,0.00027710883,0.0001232369,0.000737809,0.0012324883,0.789456,0.011759668,0.10753541,0.08615263,0.000103202845],"about_ca_topic_score_codex":0.0018852593,"about_ca_topic_score_gemma":0.004868877,"teacher_disagreement_score":0.0074482462,"about_ca_system_score_codex":0.0012844978,"about_ca_system_score_gemma":0.001408509,"threshold_uncertainty_score":0.024916887},"labels":[],"label_agreement":null},{"id":"W3184099511","doi":"10.29173/mocs179","title":"Construction-Centric Building Information Modelling to Facilitate Building Panel Prefabrication","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Building information modeling; Engineering; Construction engineering; Architecture; Architectural engineering; Interface (matter); Construction industry; Application programming interface; Production (economics); Civil engineering; Computer science; Operations management","score_opus":0.033752157743767164,"score_gpt":0.2027848462149963,"score_spread":0.16903268847122913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184099511","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018428296,0.000105852494,0.92497534,0.00009947754,0.000034157405,0.00024621442,0.0018620057,0.040638756,0.013609824],"genre_scores_gemma":[0.33806318,0.00040108443,0.6351228,0.00009959592,0.000021324604,0.0004317833,0.009835706,0.0032220818,0.012802464],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995503,0.00006359637,0.000029172686,0.000093924114,0.00022747018,0.000035464527],"domain_scores_gemma":[0.9995284,0.00009504487,0.000047395362,0.000194399,0.000105813124,0.000028950108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00051691977,0.0010097293,0.00063868996,0.001170917,0.0003521533,0.0013656197,0.0014980535,0.0005705786,0.00956828],"category_scores_gemma":[0.0012206935,0.0005967876,0.0009017212,0.00096319633,0.00025145517,0.0013047291,0.0016891662,0.0007190833,0.003766029],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00066378573,0.000540626,0.0072203767,0.0010145946,0.00014034177,0.0010642345,0.0024155416,0.25619775,0.077731416,0.02395396,0.045941845,0.5831155],"study_design_scores_gemma":[0.000051692306,0.00009859918,0.004313777,0.000095304844,0.00006716227,0.0005936998,0.00027281622,0.8404715,0.046247642,0.006580934,0.1011125,0.00009437317],"about_ca_topic_score_codex":0.0030908142,"about_ca_topic_score_gemma":0.0049881404,"teacher_disagreement_score":0.00956828,"about_ca_system_score_codex":0.00053196837,"about_ca_system_score_gemma":0.0008758348,"threshold_uncertainty_score":0.032009065},"labels":[],"label_agreement":null},{"id":"W3184732091","doi":"10.29173/mocs183","title":"Modular Home off-site Construction Production Line Improvement","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Productivity; Factory (object-oriented programming); Production line; Manufacturing engineering; Production (economics); Lean construction; Upstream (networking); Resource (disambiguation); Engineering; Lean manufacturing; Systems engineering; Computer science; Construction engineering; Construction industry","score_opus":0.00998583704053503,"score_gpt":0.19080182529070538,"score_spread":0.18081598825017037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3184732091","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31974244,0.00024216728,0.63107127,0.0002530834,0.000043274755,0.00040458926,0.0002710552,0.0042037843,0.043768346],"genre_scores_gemma":[0.6869902,0.00019973579,0.3026938,0.000047870526,0.000013772099,0.00012667727,0.00043597343,0.00031296944,0.009178988],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985789,0.00035195018,0.00003976415,0.00013644944,0.0007520661,0.0001407941],"domain_scores_gemma":[0.9985904,0.00032417887,0.00018583477,0.00044174958,0.00039425312,0.000063556996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015003263,0.0009155811,0.00041287902,0.0015014546,0.0004049989,0.001122005,0.00119959,0.0005224008,0.0054839747],"category_scores_gemma":[0.00220428,0.0002690445,0.0006020267,0.0010560392,0.0003561657,0.00086178584,0.0015876021,0.00041686115,0.0011979236],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025935972,0.0011221401,0.013131632,0.00040036044,0.000034567343,0.0007444775,0.0012677498,0.10746776,0.073613755,0.011252704,0.0053980737,0.7853074],"study_design_scores_gemma":[0.00021128674,0.003244894,0.076373905,0.00035433748,0.00022994267,0.0022902535,0.0030548088,0.5052337,0.23323485,0.014566965,0.16104627,0.00015885053],"about_ca_topic_score_codex":0.0016617958,"about_ca_topic_score_gemma":0.003571917,"teacher_disagreement_score":0.0054839747,"about_ca_system_score_codex":0.0008596661,"about_ca_system_score_gemma":0.0011573909,"threshold_uncertainty_score":0.018345773},"labels":[],"label_agreement":null},{"id":"W3185252534","doi":"10.37394/232015.2021.17.73","title":"On the Exploration of Building Information Modeling Capabilities for Promoting Sustainability-related Practices in Construction Projects: Case Studies in China and USA","year":2021,"lang":"en","type":"article","venue":"WSEAS TRANSACTIONS ON ENVIRONMENT AND DEVELOPMENT","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Certification; Sustainability; Building information modeling; Green building; Environmental design; Architectural engineering; Sustainable design; Process (computing); China; Engineering; Engineering management; Systems engineering; Construction engineering; Computer science; Civil engineering; Operations management; Political science","score_opus":0.02864168849830251,"score_gpt":0.2492484376405293,"score_spread":0.2206067491422268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185252534","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99203473,0.000047183265,0.0009891075,0.00020957195,0.0000012651014,0.00008926501,0.000024068308,0.000014624668,0.006590171],"genre_scores_gemma":[0.9957171,0.00014253141,0.0028935138,0.000021298118,9.155389e-7,0.00005962067,0.000031758504,0.000005453084,0.0011277077],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99708694,0.0020519467,0.00006868789,0.00009388495,0.00041165738,0.00028697465],"domain_scores_gemma":[0.9955154,0.0028061324,0.00036787847,0.00038256796,0.00062228896,0.00030562837],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005914166,0.00038402638,0.00027777976,0.0019251379,0.0019430325,0.0020399224,0.0010880723,0.0009102204,0.0014493929],"category_scores_gemma":[0.006343467,0.00027685968,0.0004087961,0.0029713318,0.0019033417,0.0019651551,0.0022208083,0.0006167796,0.00012944815],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006066552,0.0040922384,0.3643905,0.0009193274,0.00014583388,0.010335434,0.2675135,0.042344462,0.00882926,0.044172518,0.0038683729,0.25278187],"study_design_scores_gemma":[0.00017769585,0.0029261145,0.29009977,0.00081548863,0.00027899284,0.0016451939,0.47852707,0.13759977,0.013010094,0.005684039,0.0690167,0.00021917517],"about_ca_topic_score_codex":0.1101802,"about_ca_topic_score_gemma":0.2247526,"teacher_disagreement_score":0.1101802,"about_ca_system_score_codex":0.006257688,"about_ca_system_score_gemma":0.0055437754,"threshold_uncertainty_score":0.21907777},"labels":[],"label_agreement":null},{"id":"W3185283405","doi":"10.1139/cjce-2021-0190","title":"Formwork systems selection criteria for building construction projects: a critical review of the literature","year":2021,"lang":"en","type":"review","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formwork; Selection (genetic algorithm); Multiple-criteria decision analysis; Construction engineering; Computer science; Operations research; Risk analysis (engineering); Engineering; Management science; Civil engineering; Business; Artificial intelligence","score_opus":0.019837073169072884,"score_gpt":0.26228933447620206,"score_spread":0.24245226130712919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185283405","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014522381,0.9909305,0.002861161,0.0021513386,0.00037151613,0.00047250546,0.00008458353,0.000016055183,0.0016601419],"genre_scores_gemma":[0.014978709,0.96684974,0.016224205,0.00066900183,0.00016987212,0.00066140515,0.000137332,0.00001532804,0.0002944303],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9802781,0.008384402,0.004470606,0.0007338529,0.0058386377,0.00029441493],"domain_scores_gemma":[0.94099814,0.038944628,0.0036002493,0.0006036748,0.0154319685,0.0004212292],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03546613,0.0016317345,0.0035489714,0.020334681,0.0019894019,0.004472537,0.0029816905,0.002059752,0.00186691],"category_scores_gemma":[0.05251617,0.0011763878,0.00192445,0.017950727,0.0021724766,0.004911191,0.002012442,0.002260146,0.00046535433],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000096205884,0.00011207861,0.0012721784,0.21003397,0.00044111948,0.00054689805,0.0038779993,0.0010845269,0.00085807085,0.008487553,0.014226982,0.75896245],"study_design_scores_gemma":[0.00006164699,0.00035274864,0.0066201906,0.4719561,0.0023781592,0.0016093017,0.010695527,0.0015071874,0.0013775113,0.008774485,0.49440935,0.00025773773],"about_ca_topic_score_codex":0.011134155,"about_ca_topic_score_gemma":0.030930512,"teacher_disagreement_score":0.03546613,"about_ca_system_score_codex":0.007047623,"about_ca_system_score_gemma":0.023093633,"threshold_uncertainty_score":0.18756509},"labels":[],"label_agreement":null},{"id":"W3185388864","doi":"10.29173/mocs151","title":"Development of Conceptual Modular Building Unit Design Framework for Inexperienced Designers at the Pre-Design Stage","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Process (computing); Design process; Systems engineering; Engineering design process; Unit (ring theory); Architectural engineering; Engineering; Modular construction; Conceptual design; Computer science; Building design; Construction engineering; Engineering management; Process management; Work in process; Operations management; Human–computer interaction; Mechanical engineering","score_opus":0.050631562472005835,"score_gpt":0.2567080131264988,"score_spread":0.20607645065449298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185388864","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033736785,0.00018536467,0.97915834,0.00025332166,0.000034284996,0.00045727298,0.00020212827,0.0009452984,0.015390274],"genre_scores_gemma":[0.030964172,0.00032823306,0.9625019,0.000059568254,0.000011145485,0.0007229641,0.00060497236,0.00014673277,0.0046602017],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9983558,0.00045013597,0.00016693611,0.00021776248,0.000680369,0.0001288562],"domain_scores_gemma":[0.9989403,0.00024502515,0.00010090991,0.0001493236,0.0004808194,0.000083643776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033306726,0.0011161105,0.00053224247,0.0025534544,0.0012011245,0.0031588087,0.0024241253,0.0011685431,0.0059804716],"category_scores_gemma":[0.0027471518,0.00068928825,0.0013263936,0.0011442886,0.0012537218,0.0030020073,0.0019702981,0.0017301653,0.0018738429],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060947234,0.00018941991,0.002538386,0.0010428713,0.00003933811,0.00082865515,0.0075507495,0.05064708,0.011296884,0.66775954,0.012770874,0.24527517],"study_design_scores_gemma":[0.000066509245,0.0002371486,0.0019314064,0.0016717608,0.00010016684,0.0015818987,0.0042942725,0.25757238,0.012789536,0.15456182,0.5650373,0.00015592328],"about_ca_topic_score_codex":0.0077266237,"about_ca_topic_score_gemma":0.0119399,"teacher_disagreement_score":0.0077266237,"about_ca_system_score_codex":0.0017894963,"about_ca_system_score_gemma":0.004520666,"threshold_uncertainty_score":0.020006657},"labels":[],"label_agreement":null},{"id":"W3185791341","doi":"10.26168/ajce.34.1.4","title":"La recherche action collaborative : une nouvelle approche pour l'intégration du BIM","year":2020,"lang":"fr","type":"article","venue":"Dépôt institutionnel de l'Université libre de Bruxelles (Université Libre de Bruxelles)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Humanities; Political science; Sociology; Philosophy","score_opus":0.04155244893514295,"score_gpt":0.2297301837267506,"score_spread":0.18817773479160765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3185791341","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010881304,0.0009123772,0.98061,0.0015707153,0.00018072227,0.00027573918,0.00008697014,0.00182467,0.013450643],"genre_scores_gemma":[0.026838671,0.0014285257,0.95598,0.00063576427,0.00011538138,0.0005244988,0.0004809172,0.0010692839,0.012926916],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9393182,0.029091842,0.0040259566,0.007587105,0.018516535,0.0014603996],"domain_scores_gemma":[0.9651195,0.011308036,0.0014374176,0.011959543,0.008723376,0.0014520892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.042189494,0.0028624744,0.002502024,0.008524915,0.004834913,0.020728735,0.0073348125,0.00737617,0.012440014],"category_scores_gemma":[0.037072524,0.0028540904,0.0054290956,0.007132945,0.010109685,0.017337976,0.016832575,0.008730726,0.0071279556],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020881012,0.00027134447,0.0016425635,0.0019267793,0.00034828644,0.0006231422,0.017854767,0.014289386,0.007852205,0.60214996,0.0131000625,0.33973268],"study_design_scores_gemma":[0.00012445374,0.0002809585,0.0012288792,0.0014868758,0.0003147308,0.0012915861,0.0037385293,0.057076376,0.010567446,0.16998766,0.7536138,0.00028868005],"about_ca_topic_score_codex":0.0212291,"about_ca_topic_score_gemma":0.021282902,"teacher_disagreement_score":0.042189494,"about_ca_system_score_codex":0.00551005,"about_ca_system_score_gemma":0.0148735875,"threshold_uncertainty_score":0.22312206},"labels":[],"label_agreement":null},{"id":"W3186492530","doi":"10.29173/mocs166","title":"Risk Mitigation through Tolerance Strategies for Design in Modularization","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Rework; Risk analysis (engineering); Modular programming; Maintainability; Reliability engineering; Computer science; Engineering; Business; Embedded system","score_opus":0.01632201230720975,"score_gpt":0.21418602635848605,"score_spread":0.1978640140512763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186492530","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014332157,0.00019936009,0.97952855,0.00010966913,0.000013799284,0.00009013491,0.000005469464,0.00013641802,0.0055844374],"genre_scores_gemma":[0.4949102,0.0004710523,0.5012149,0.00009900014,0.000018994997,0.000304251,0.000029353245,0.00008317605,0.0028690076],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9973653,0.0010395925,0.00015434151,0.00025911408,0.0009953473,0.00018623569],"domain_scores_gemma":[0.99756324,0.00089383457,0.0005506414,0.00040942893,0.0004994651,0.000083494386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036178692,0.0015218917,0.00064204115,0.0018439377,0.00064859545,0.0016455561,0.0011872279,0.00082274457,0.002093663],"category_scores_gemma":[0.00597534,0.000467609,0.00080831884,0.00072671566,0.0017835431,0.0018691362,0.0027489003,0.0009594073,0.00027273645],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000640165,0.00015379037,0.0015986958,0.00035094126,0.00009168524,0.00013453486,0.0007824128,0.6353445,0.017326815,0.14575434,0.0005987598,0.19779949],"study_design_scores_gemma":[0.00005196457,0.0008275704,0.001136209,0.00038327256,0.0001379751,0.00036988265,0.0006241714,0.7258986,0.02374379,0.23029831,0.016452076,0.000076177756],"about_ca_topic_score_codex":0.0006544346,"about_ca_topic_score_gemma":0.0008394447,"teacher_disagreement_score":0.0036178692,"about_ca_system_score_codex":0.0009777504,"about_ca_system_score_gemma":0.0016332516,"threshold_uncertainty_score":0.01913333},"labels":[],"label_agreement":null},{"id":"W3186564867","doi":"10.29173/mocs149","title":"BIM-Integrated Simulation of Construction Operations for Lean Production Management","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Research Foundation of Korea; Ministry of Science, ICT and Future Planning; National Research Foundation","keywords":"Procurement; Productivity; Schedule; Production (economics); Computer science; Plan (archaeology); Supply chain; Reliability (semiconductor); Lean manufacturing; Simulation modeling; Reliability engineering; Operations management; Engineering; Business","score_opus":0.01666541407334009,"score_gpt":0.22140367666189392,"score_spread":0.20473826258855382,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186564867","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10624959,0.000093840805,0.8671685,0.00021538777,0.00009858303,0.000196322,0.0013896583,0.004009925,0.020578196],"genre_scores_gemma":[0.75034493,0.00020042845,0.2430746,0.000045632834,0.000014018252,0.00040383832,0.0016792867,0.00029351114,0.0039436813],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996313,0.00011690839,0.000026261365,0.00003693711,0.00014321772,0.000045423112],"domain_scores_gemma":[0.9995609,0.00017386707,0.000033193304,0.00008607347,0.00010522285,0.000040726958],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008129253,0.0006517119,0.00053003925,0.00073866436,0.0005106817,0.0010779877,0.0009071706,0.0007309901,0.005154806],"category_scores_gemma":[0.0012811036,0.00046706348,0.0007761225,0.00082553126,0.00044049494,0.00083818624,0.0009648862,0.0006656227,0.0007259035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048871483,0.00007880673,0.0012869618,0.000032705608,0.000012953262,0.000045138946,0.00007614936,0.9812354,0.0015218605,0.006757003,0.0006143761,0.00828976],"study_design_scores_gemma":[0.0000066147436,0.000010332512,0.00018222426,0.0000037652455,0.000003013696,0.0000065137074,0.000014808984,0.99672,0.00076450285,0.0011126469,0.0011713202,0.000004174573],"about_ca_topic_score_codex":0.008460779,"about_ca_topic_score_gemma":0.008865483,"teacher_disagreement_score":0.008460779,"about_ca_system_score_codex":0.0008215002,"about_ca_system_score_gemma":0.0016044689,"threshold_uncertainty_score":0.017244577},"labels":[],"label_agreement":null},{"id":"W3186607705","doi":"10.36680/j.itcon.2021.021","title":"Maturity-based mapping of technology and method innovation in off-site construction: conceptual frameworks","year":2021,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Benchmarking; Maturity (psychological); Scope (computer science); Context (archaeology); Capability Maturity Model; Conceptual framework; Process management; Technology roadmap; Knowledge management; Computer science; Systems engineering; Engineering; Business; Marketing; Geography","score_opus":0.00559397306745559,"score_gpt":0.22390091633950168,"score_spread":0.21830694327204608,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3186607705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07504248,0.0064970236,0.7935074,0.0090865595,0.00011685678,0.0016210033,0.0005577606,0.00039953744,0.113171406],"genre_scores_gemma":[0.60022444,0.003332626,0.39109665,0.00021936519,0.00003544787,0.0015597547,0.0005659831,0.00008810165,0.0028776403],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9875159,0.0068104477,0.0011456853,0.0011338985,0.002473279,0.00092073675],"domain_scores_gemma":[0.9840328,0.010078997,0.0016800764,0.0010979598,0.0024321256,0.00067806494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019543976,0.0014821464,0.0006510743,0.022303758,0.002607388,0.014079829,0.003178367,0.0031867947,0.00395146],"category_scores_gemma":[0.022673696,0.00097565993,0.0020899712,0.015420896,0.009969474,0.019039065,0.00674645,0.0034863784,0.00065057375],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015244969,0.0001009434,0.0034738649,0.0005310967,0.000029053568,0.00015643815,0.009917965,0.008197411,0.00036418255,0.9287804,0.000816145,0.047617204],"study_design_scores_gemma":[0.000021566839,0.00011340626,0.009459801,0.002531785,0.00005635651,0.0004381373,0.029656397,0.05914601,0.0011474967,0.8374201,0.05988351,0.00012543797],"about_ca_topic_score_codex":0.012304141,"about_ca_topic_score_gemma":0.008502363,"teacher_disagreement_score":0.022303758,"about_ca_system_score_codex":0.017076438,"about_ca_system_score_gemma":0.01258319,"threshold_uncertainty_score":0.123898804},"labels":[],"label_agreement":null},{"id":"W3189873253","doi":"10.29173/ijic249","title":"Overview of the Characteristics of the Modular Industry and Barriers to its Increased Market Share","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta; Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Procurement; Modular design; Context (archaeology); Work (physics); Engineering; Construction management; Business; Engineering management; Operations management; Civil engineering; Marketing; Computer science","score_opus":0.0198415928146441,"score_gpt":0.24666073306717726,"score_spread":0.22681914025253316,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3189873253","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8616885,0.013646664,0.003369259,0.004173092,0.000044212742,0.00027308456,0.006227123,0.000104244704,0.11047381],"genre_scores_gemma":[0.9694564,0.015577117,0.0026373619,0.00029682764,0.000065177395,0.0000840008,0.0032067534,0.000026236508,0.008650048],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984719,0.0001137357,0.000095172036,0.00013686408,0.0007628419,0.00041945724],"domain_scores_gemma":[0.9944178,0.0009092292,0.0017607245,0.000100826604,0.0018053699,0.0010059653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011911069,0.00021837611,0.00016184461,0.0064762,0.0010231102,0.0026957456,0.000489891,0.0004002532,0.0063717677],"category_scores_gemma":[0.0027485145,0.00018121219,0.0002794922,0.011949523,0.0006224197,0.0016357749,0.0007801199,0.00046744122,0.00068804756],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015363915,0.00018250427,0.71258324,0.0012525494,0.00003859279,0.0007565227,0.0054551167,0.0015397236,0.004043086,0.01148115,0.01103723,0.25147673],"study_design_scores_gemma":[0.000001511245,0.000048112972,0.94795895,0.00015396606,0.000008027407,0.00032040814,0.0048671346,0.00025942296,0.0003006301,0.00046168308,0.045603644,0.000016494196],"about_ca_topic_score_codex":0.19131505,"about_ca_topic_score_gemma":0.32597575,"teacher_disagreement_score":0.19131505,"about_ca_system_score_codex":0.0049426476,"about_ca_system_score_gemma":0.006337453,"threshold_uncertainty_score":0.38040298},"labels":[],"label_agreement":null},{"id":"W3191066931","doi":"10.1061/(asce)la.1943-4170.0000489","title":"Ontology for Linking Delay Claims with 4D Simulation to Analyze Effects-Causes and Responsibilities","year":2021,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Computer science; GRASP; Causality (physics); Negotiation; Workbench; Taxonomy (biology); Multidisciplinary approach; Liability; Risk analysis (engineering); Knowledge management; Data mining; Visualization; Software engineering; Law; Accounting; Business","score_opus":0.004404616675288333,"score_gpt":0.21025981862314624,"score_spread":0.20585520194785792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191066931","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0062588556,0.0002181198,0.9668161,0.00058473623,0.000095068826,0.0003810253,0.002010984,0.0018647251,0.021770502],"genre_scores_gemma":[0.07799211,0.0008839706,0.9103291,0.00018601266,0.000030235295,0.00075682654,0.0050103753,0.0004472019,0.0043641943],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99807394,0.00045654876,0.00034107096,0.00027355243,0.0007166824,0.00013806703],"domain_scores_gemma":[0.99823964,0.00067673123,0.00020098466,0.0004116103,0.00034744327,0.00012354268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020432002,0.0010267709,0.00058517925,0.0068578157,0.0017508785,0.004500193,0.0016236625,0.0014737066,0.006023793],"category_scores_gemma":[0.0050783646,0.00057162537,0.0031265705,0.0047822595,0.0019526725,0.006147294,0.0048923697,0.0020023172,0.0010271373],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007860439,0.00023559725,0.005165191,0.00082933245,0.00014341206,0.0008346537,0.0073096287,0.03236512,0.0061538466,0.779272,0.014496535,0.15311594],"study_design_scores_gemma":[0.000047919177,0.00004147953,0.0026257918,0.00069835223,0.00022854353,0.00081613765,0.00424956,0.21496633,0.0062451563,0.3795106,0.39042974,0.00014024637],"about_ca_topic_score_codex":0.015480803,"about_ca_topic_score_gemma":0.017480854,"teacher_disagreement_score":0.015480803,"about_ca_system_score_codex":0.0026037893,"about_ca_system_score_gemma":0.0045741075,"threshold_uncertainty_score":0.030781388},"labels":[],"label_agreement":null},{"id":"W3191965077","doi":"10.1139/cjce-2020-0790","title":"Modeling earthmoving operations in real time using hybrid fuzzy simulation","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fuzzy logic; Probabilistic logic; System dynamics; Industrial engineering; Engineering; Truck; Dynamism; Computer science; Operations research; Simulation; Artificial intelligence","score_opus":0.011699611184720786,"score_gpt":0.1996708265390634,"score_spread":0.1879712153543426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3191965077","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21885008,0.0001204273,0.77064955,0.00013287846,0.000026846626,0.00008126509,0.00023375136,0.00034691746,0.009558403],"genre_scores_gemma":[0.977523,0.00008852803,0.020837577,0.000011972811,0.0000042563943,0.00006306043,0.0000843623,0.0000130583085,0.0013739967],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99981445,0.000054176573,0.000013141865,0.000039895833,0.000048214508,0.00003010097],"domain_scores_gemma":[0.9996062,0.00023599838,0.000053509746,0.000024317334,0.000059387585,0.000020672485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004530341,0.00053927087,0.00048900873,0.00055310037,0.00041668213,0.0010167481,0.000737013,0.0007570122,0.0015470558],"category_scores_gemma":[0.00085247605,0.0002828039,0.00073045044,0.00039033435,0.0004768819,0.00079834904,0.0005480452,0.00050981063,0.00014871392],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008005559,0.0000061493242,0.0002672239,0.000003931594,0.000004770191,0.000009461828,0.000012206996,0.99748176,0.00021850152,0.00087853585,0.000014257793,0.001095141],"study_design_scores_gemma":[0.0000012455374,0.000004494902,0.00006295647,9.610826e-7,0.0000015358905,0.0000015814293,0.0000046752643,0.99948525,0.00008633043,0.000296765,0.00005245962,0.0000016079639],"about_ca_topic_score_codex":0.031726424,"about_ca_topic_score_gemma":0.019342009,"teacher_disagreement_score":0.031726424,"about_ca_system_score_codex":0.00087507616,"about_ca_system_score_gemma":0.0008788895,"threshold_uncertainty_score":0.06308353},"labels":[],"label_agreement":null},{"id":"W3192315988","doi":"10.29173/ijic252","title":"Construction stakeholders’ perceived benefits and barriers for environment-friendly modular construction in a hospitality centric environment","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrialized Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Schedule; Business; Sustainability; Hospitality; Process management; Documentation; Quality (philosophy); Marketing; Operations management; Engineering management; Engineering; Tourism; Computer science","score_opus":0.022736039882881972,"score_gpt":0.216109268364984,"score_spread":0.19337322848210203,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3192315988","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.997598,0.000019529192,0.00044567345,0.0003214458,0.0000021968792,0.000015757847,0.0000046519913,0.0000040554105,0.0015887287],"genre_scores_gemma":[0.99937755,0.000027346037,0.00030242628,0.000054379267,8.035623e-7,0.000011132216,0.0000042685197,0.0000015240703,0.00022068406],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9946261,0.0029445759,0.00023409147,0.00020489153,0.0008006993,0.0011896526],"domain_scores_gemma":[0.99142796,0.0036111188,0.001334073,0.00020858584,0.0014512858,0.0019669016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006693526,0.000247868,0.00019539187,0.0006968862,0.002423014,0.0019987472,0.00057568535,0.0010302009,0.0027097953],"category_scores_gemma":[0.010465584,0.00034249274,0.00023734909,0.0004739512,0.0018373101,0.0011996924,0.002834428,0.0007769731,0.00022478128],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031364732,0.00079438835,0.6058632,0.000455218,0.000043561464,0.002846722,0.33079723,0.0010388936,0.0118857045,0.004519717,0.0014849565,0.039956737],"study_design_scores_gemma":[0.000018590754,0.0005475715,0.21752968,0.00020089641,0.000027948407,0.00066706305,0.76900625,0.0018187806,0.0010467917,0.000766316,0.008316601,0.00005350883],"about_ca_topic_score_codex":0.007833124,"about_ca_topic_score_gemma":0.015193351,"teacher_disagreement_score":0.007833124,"about_ca_system_score_codex":0.0022692594,"about_ca_system_score_gemma":0.0033942885,"threshold_uncertainty_score":0.0353992},"labels":[],"label_agreement":null},{"id":"W3196414549","doi":"","title":"Building Information Modeling (BIM) 'Best practices' project report: An investigation of 'best practices' through case studies at regional, national, and international levels","year":2011,"lang":"en","type":"article","venue":"QUT ePrints (Queensland University of Technology)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Integrated project delivery; Best practice; Process management; Work (physics); Scope (computer science); Business; Project team; Process (computing); Real estate; Project management; Knowledge management; Engineering; Operations management; Computer science; Systems engineering; Finance","score_opus":0.17419984135298358,"score_gpt":0.32488009276158203,"score_spread":0.15068025140859845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196414549","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7329525,0.0023043375,0.06585804,0.016796995,0.00016230984,0.0048989286,0.0022783761,0.0009587544,0.17378972],"genre_scores_gemma":[0.84502983,0.0024177155,0.13484947,0.00068371755,0.000016384927,0.0015317856,0.001584782,0.00035282006,0.013533459],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.96005726,0.01778578,0.0017967122,0.0012481653,0.017089898,0.0020221523],"domain_scores_gemma":[0.97471946,0.009162843,0.0020567467,0.003907522,0.009172758,0.0009807157],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03277838,0.0006701113,0.00043075232,0.0035143094,0.0072208378,0.0072634583,0.0026642694,0.0018820846,0.0016277148],"category_scores_gemma":[0.03269062,0.000942978,0.0005804183,0.0067858943,0.005275163,0.0047411933,0.0039019734,0.0023545038,0.00046934682],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014194293,0.0017126943,0.03838636,0.0017487733,0.00010530513,0.0026907497,0.32995442,0.008362199,0.0052664643,0.065685876,0.04327709,0.50266814],"study_design_scores_gemma":[0.00012755071,0.0013012642,0.050976273,0.002190954,0.00021276553,0.002792365,0.392745,0.008704539,0.021160511,0.010588456,0.50876594,0.00043439778],"about_ca_topic_score_codex":0.15443495,"about_ca_topic_score_gemma":0.25393897,"teacher_disagreement_score":0.15443495,"about_ca_system_score_codex":0.017413987,"about_ca_system_score_gemma":0.027540691,"threshold_uncertainty_score":0.3070721},"labels":[],"label_agreement":null},{"id":"W3196481044","doi":"10.1007/978-981-19-0968-9_2","title":"A Faceted Classification System for Innovation in the Construction Industry","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Scope (computer science); Conceptualization; Knowledge management; Class (philosophy); Computer science; Scale (ratio); Management science; Data science; Process management; Engineering; Business; Artificial intelligence; Geography","score_opus":0.01757988222757798,"score_gpt":0.20914848622635246,"score_spread":0.19156860399877448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196481044","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03298343,0.0028956996,0.80743617,0.001846144,0.0015204487,0.0010496755,0.018719146,0.0060500987,0.12749913],"genre_scores_gemma":[0.14939627,0.0013892141,0.7840364,0.000536805,0.000267333,0.0011510757,0.028537694,0.0007828337,0.03390241],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9979747,0.00039850894,0.00039671684,0.00039300916,0.0005143233,0.00032277132],"domain_scores_gemma":[0.9972089,0.00059848157,0.00018344606,0.00059218897,0.0012134074,0.00020363418],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017394074,0.00065869145,0.00060802087,0.006042319,0.0018042506,0.0046055987,0.0011883865,0.0012016773,0.015470428],"category_scores_gemma":[0.0041539967,0.00023363007,0.0018160561,0.0070595257,0.0015585315,0.0046079513,0.0022408275,0.0016873041,0.007838081],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012857626,0.000100167475,0.009130002,0.00038723642,0.000050231232,0.00023056619,0.0021093735,0.0022541853,0.0054612528,0.4980138,0.07650635,0.40562832],"study_design_scores_gemma":[0.000030532316,0.00018590427,0.011191094,0.00056263164,0.00009563674,0.0010214312,0.002833288,0.042333655,0.0035111348,0.46297574,0.47515604,0.000102944134],"about_ca_topic_score_codex":0.008912993,"about_ca_topic_score_gemma":0.006900547,"teacher_disagreement_score":0.015470428,"about_ca_system_score_codex":0.0018021249,"about_ca_system_score_gemma":0.002576669,"threshold_uncertainty_score":0.0517537},"labels":[],"label_agreement":null},{"id":"W3196605555","doi":"10.3390/su131810060","title":"Simulation-Based Approach for Lookahead Scheduling of Onshore Wind Projects Subject to Weather Risk","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Canada First Research Excellence Fund","keywords":"Scheduling (production processes); Wind speed; Computer science; Environmental science; Decision support system; Operations research; Meteorology; Engineering; Operations management; Data mining; Geography","score_opus":0.012776686077661947,"score_gpt":0.2577541714799061,"score_spread":0.24497748540224415,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196605555","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06211533,0.00012562722,0.93246305,0.00010185884,0.000036580463,0.00013001048,0.00018455143,0.00080864684,0.00403436],"genre_scores_gemma":[0.8063189,0.000121753976,0.19164394,0.000028976663,0.000017887383,0.00023420599,0.00026389456,0.00009785362,0.001272568],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995567,0.0001821843,0.000027221895,0.00007606633,0.00009662788,0.000061228006],"domain_scores_gemma":[0.9989635,0.00059337437,0.00013369326,0.00006889511,0.00015684695,0.000083669736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011375037,0.00074050284,0.00075639825,0.0008285046,0.00039245607,0.0008545805,0.0010384385,0.0007027344,0.002342769],"category_scores_gemma":[0.0020644963,0.0006161771,0.00068039674,0.0006223856,0.0003055816,0.0004988334,0.0008164513,0.0005976756,0.00024788975],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025662994,0.00001467041,0.00038069737,0.000012710331,0.000012495389,0.000017561399,0.000023084262,0.9942363,0.0003776515,0.0007439379,0.00007942185,0.004075839],"study_design_scores_gemma":[0.0000031830434,0.0000056343124,0.00006130105,0.0000016218186,0.0000028941008,0.0000023919508,0.0000056095955,0.9994167,0.000095392184,0.00028218926,0.00012119957,0.0000018743832],"about_ca_topic_score_codex":0.01593831,"about_ca_topic_score_gemma":0.014281907,"teacher_disagreement_score":0.01593831,"about_ca_system_score_codex":0.00081945246,"about_ca_system_score_gemma":0.0016836622,"threshold_uncertainty_score":0.031691074},"labels":[],"label_agreement":null},{"id":"W3196745607","doi":"","title":"Framework to establish the relationship between factors influencing construction productivity using fuzzy interpretive structural modeling","year":2019,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Fuzzy logic; Fuzzy set; Computer science; Management science; Risk analysis (engineering); Business; Engineering; Economics; Artificial intelligence; Economic growth","score_opus":0.03002855157534349,"score_gpt":0.2626140417166365,"score_spread":0.232585490141293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3196745607","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03809457,0.00014580117,0.94997144,0.00039855126,0.000016744434,0.00014385207,0.00019272276,0.00011543263,0.010920941],"genre_scores_gemma":[0.6911404,0.00024158436,0.30610463,0.00006680629,0.00001579528,0.0004321646,0.00025080104,0.000016073132,0.0017317804],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991406,0.000364719,0.000049376013,0.000113603885,0.0002647513,0.00006677364],"domain_scores_gemma":[0.9985428,0.00086138677,0.00017372909,0.000075531316,0.00030303365,0.000043625423],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020975021,0.0008376238,0.00050379033,0.0036791868,0.0005872443,0.0015620855,0.0012335542,0.0006161295,0.0033301488],"category_scores_gemma":[0.0043182867,0.00033404474,0.000734589,0.0020661298,0.0008805786,0.0014370141,0.00086319196,0.00071632664,0.0003492621],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010052157,0.00059600215,0.01620985,0.0003287098,0.00025801308,0.00036493893,0.0016231107,0.21888079,0.0055468893,0.6544859,0.0014024852,0.100202926],"study_design_scores_gemma":[0.00003312425,0.00013400197,0.0065818527,0.00013834481,0.000119813,0.00012595224,0.00097494555,0.8352572,0.001574925,0.15116985,0.0038376744,0.000052480427],"about_ca_topic_score_codex":0.008476502,"about_ca_topic_score_gemma":0.0070544104,"teacher_disagreement_score":0.008476502,"about_ca_system_score_codex":0.0012905274,"about_ca_system_score_gemma":0.0025580234,"threshold_uncertainty_score":0.016854286},"labels":[],"label_agreement":null},{"id":"W3197063582","doi":"10.29173/mocs146","title":"A Study on Freeform Optimization using BIM Technology","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Construction engineering; Visualization; Computer science; Process (computing); Quality (philosophy); Engineering; Systems engineering; Risk analysis (engineering); Mechanical engineering","score_opus":0.021864561917337523,"score_gpt":0.22342238909860235,"score_spread":0.20155782718126483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197063582","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.103061736,0.002498591,0.8399414,0.00047254714,0.000120000215,0.0001360066,0.00010074778,0.00022662996,0.05344241],"genre_scores_gemma":[0.73710084,0.0047733365,0.24481456,0.00013003635,0.000075475546,0.0001396564,0.00019965327,0.00014145796,0.012625011],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989411,0.0003588674,0.000036356363,0.00010636632,0.0004878151,0.00006952986],"domain_scores_gemma":[0.9993199,0.00035901307,0.00004267535,0.000099753626,0.00015701397,0.000021734868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010370525,0.0005517435,0.0004897441,0.00086801575,0.0004588764,0.0012697127,0.00057132577,0.000677611,0.0025311739],"category_scores_gemma":[0.0017823745,0.0003716238,0.0010181556,0.0014890658,0.00050900265,0.0017793755,0.0007398764,0.0005195727,0.00032280435],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000112858084,0.00030900358,0.00562176,0.0005783745,0.00006419357,0.00040935405,0.00057290506,0.49893898,0.013443914,0.108667426,0.0032288425,0.36805233],"study_design_scores_gemma":[0.000011884758,0.00018111008,0.0028090447,0.00007375872,0.00002965982,0.0002724801,0.00032747124,0.95267737,0.010961065,0.011589924,0.021027766,0.00003845898],"about_ca_topic_score_codex":0.0022143945,"about_ca_topic_score_gemma":0.0016895649,"teacher_disagreement_score":0.0025311739,"about_ca_system_score_codex":0.00049359864,"about_ca_system_score_gemma":0.0006410332,"threshold_uncertainty_score":0.008467615},"labels":[],"label_agreement":null},{"id":"W3197450189","doi":"10.1007/978-981-19-1029-6_11","title":"Applying ISO 19650 Guidelines on Digital Deliverables Intended for BIM-Centric Facility Management (FM) in Quebec’s Context","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Facility management; Deliverable; Context (archaeology); Digitization; Process management; Work (physics); Process (computing); Knowledge management; Project management; Information management; Engineering; Engineering management; Business; Systems engineering; Computer science; Operations management","score_opus":0.016097323374345985,"score_gpt":0.2109582346142138,"score_spread":0.19486091123986782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197450189","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030190991,0.0034450847,0.07860547,0.006991339,0.0008469454,0.00078123953,0.0049680327,0.0012403936,0.87293047],"genre_scores_gemma":[0.16744576,0.0043690377,0.15194309,0.001452434,0.00007928503,0.00046049082,0.0065992656,0.0009979923,0.6666526],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99603695,0.00049033284,0.00020147876,0.00028619662,0.0025354782,0.00044954382],"domain_scores_gemma":[0.99696976,0.00025979284,0.00011025264,0.00022187439,0.0023012145,0.00013705573],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031195665,0.00089406,0.0002813637,0.005236047,0.0038141278,0.0065513393,0.0020671408,0.0015797473,0.015377783],"category_scores_gemma":[0.0049334257,0.0005286348,0.0004940609,0.00634485,0.0022504968,0.0020087804,0.0016727652,0.0016988671,0.0039136764],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004826556,0.00011452957,0.0042469525,0.00056150113,0.000018461602,0.0010348054,0.013672164,0.006581687,0.010946876,0.32461205,0.2440818,0.3940809],"study_design_scores_gemma":[0.00000393947,0.000017037859,0.005259933,0.0004517523,0.000010125548,0.00017375284,0.0022996485,0.0013627169,0.0021863177,0.0033370745,0.98486024,0.00003753969],"about_ca_topic_score_codex":0.94698584,"about_ca_topic_score_gemma":0.96962535,"teacher_disagreement_score":0.05569846,"about_ca_system_score_codex":0.05569846,"about_ca_system_score_gemma":0.05697615,"threshold_uncertainty_score":0.40412253},"labels":[],"label_agreement":null},{"id":"W3197682149","doi":"10.17762/de.vi.3550","title":"Factors Affecting Selection of Excavation Support System","year":2021,"lang":"en","type":"article","venue":"Design Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Selection (genetic algorithm); Decision support system; Excavation; Risk analysis (engineering); Set (abstract data type); Process (computing); Computer science; Operations research; Engineering; Business; Data mining; Artificial intelligence","score_opus":0.01653442342973657,"score_gpt":0.18882005645369646,"score_spread":0.17228563302395988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197682149","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9752456,0.0013058673,0.0063739377,0.00050977885,0.000047093356,0.00028175613,0.00014218129,0.000045446905,0.01604831],"genre_scores_gemma":[0.993364,0.0004695463,0.0044016023,0.000046370318,0.000011681552,0.000048258764,0.00008183821,0.000015662263,0.0015609709],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9934435,0.0022509822,0.00082834053,0.00037729228,0.0022865895,0.0008133756],"domain_scores_gemma":[0.9706479,0.020591063,0.0030137359,0.00038094012,0.0040881676,0.0012781996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004355797,0.00042094043,0.0002874194,0.0023649468,0.0011854108,0.0026348336,0.00042776152,0.0008242245,0.005896254],"category_scores_gemma":[0.029019488,0.00025031273,0.0003280675,0.0017012722,0.0005744214,0.0014072184,0.0007911692,0.00047162193,0.0010973362],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012153564,0.000624786,0.626116,0.0024150223,0.00021219296,0.0052369703,0.010876295,0.0073509715,0.028567249,0.004527662,0.004665642,0.3081918],"study_design_scores_gemma":[0.000056093384,0.0014616621,0.8543007,0.0009882092,0.00038049,0.0042987047,0.05937448,0.011090302,0.013918496,0.0029670047,0.05094085,0.00022310184],"about_ca_topic_score_codex":0.002505791,"about_ca_topic_score_gemma":0.00358205,"teacher_disagreement_score":0.005896254,"about_ca_system_score_codex":0.0008982517,"about_ca_system_score_gemma":0.0015400529,"threshold_uncertainty_score":0.023035944},"labels":[],"label_agreement":null},{"id":"W3197803345","doi":"10.5539/eer.v11n2p31","title":"A Review of Embedding Artificial Intelligence in Internet of Things and Building Information Modelling for Healthcare Facility Maintenance Management","year":2021,"lang":"en","type":"review","venue":"Energy and Environment Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Monash University","keywords":"Computer science; Facility management; Process (computing); Exploit; Internet of Things; Health care; Engineering management; Knowledge management; Data science; Process management; Systems engineering; Risk analysis (engineering); World Wide Web; Computer security; Business; Engineering","score_opus":0.07520946588291194,"score_gpt":0.3386164137042602,"score_spread":0.26340694782134827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3197803345","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00013420479,0.995917,0.0007683969,0.00031239013,0.0002950019,0.000012240754,0.000034191806,0.00001270368,0.0025139584],"genre_scores_gemma":[0.00081864384,0.99729353,0.00084965315,0.00017018344,0.00016511792,0.00001130898,0.000042833693,0.0000031957788,0.0006455168],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996038,0.000074836295,0.000071179755,0.0000699703,0.00015583412,0.000024397044],"domain_scores_gemma":[0.99898356,0.0006066307,0.00011779266,0.000031224066,0.0002259055,0.00003482961],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007378187,0.0010334615,0.0011142058,0.0038112483,0.00035943944,0.001281709,0.0008334558,0.0012402176,0.0044608265],"category_scores_gemma":[0.0014457413,0.0004319505,0.0007667161,0.00558572,0.00047065745,0.0021881568,0.0006906695,0.0012387708,0.0018161295],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000033001867,0.00008434413,0.000227357,0.045691885,0.00011575562,0.00020924085,0.00017836149,0.0009226736,0.0012196418,0.013614291,0.03256382,0.9051396],"study_design_scores_gemma":[0.000004913223,0.0000736004,0.0007273021,0.010797383,0.00015239643,0.0006118091,0.000107529035,0.00025059996,0.00040875722,0.0034437755,0.983393,0.000028894357],"about_ca_topic_score_codex":0.002161495,"about_ca_topic_score_gemma":0.003179215,"teacher_disagreement_score":0.0044608265,"about_ca_system_score_codex":0.00068574713,"about_ca_system_score_gemma":0.0019355771,"threshold_uncertainty_score":0.0149229765},"labels":[],"label_agreement":null},{"id":"W3198401240","doi":"10.1088/1757-899x/1218/1/012052","title":"BIM and Lean for value generation in the built asset industry: an information management perspective","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Operationalization; Asset (computer security); Productivity; Perspective (graphical); Asset management; Popularity; Business; Knowledge management; Process management; Lean manufacturing; Building information modeling; Work (physics); Computer science; Risk analysis (engineering); Industrial organization; Engineering; Operations management; Marketing; Economics; Finance; Computer security","score_opus":0.018602877532650854,"score_gpt":0.22722332359120698,"score_spread":0.20862044605855612,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3198401240","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.063555464,0.03199523,0.39220318,0.074802205,0.0008438295,0.00016904666,0.00020176954,0.00022376588,0.4360054],"genre_scores_gemma":[0.88939387,0.0131153995,0.085909024,0.0016993133,0.0006903316,0.00014313412,0.00009669803,0.000050821218,0.008901464],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.99584347,0.0021884341,0.00013797963,0.00016541425,0.0013312817,0.00033347425],"domain_scores_gemma":[0.99528015,0.0030692513,0.00040058044,0.00035048526,0.00055886427,0.00034074445],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005136786,0.00073684973,0.000500452,0.005053756,0.001814951,0.012727501,0.0013894481,0.002418637,0.003523782],"category_scores_gemma":[0.0039332733,0.00054052344,0.000552107,0.0046102703,0.011490571,0.008967371,0.0051260656,0.0032563626,0.00042942518],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000007341547,0.000027783497,0.00020464427,0.000051575556,0.0000058322858,0.000062432024,0.00037202457,0.0017471014,0.00012132903,0.98800814,0.0007068103,0.008685072],"study_design_scores_gemma":[0.0000090572485,0.000029484878,0.00052095845,0.000424357,0.000015120967,0.000118572876,0.0020870073,0.013756151,0.0008475901,0.9441797,0.037987612,0.000024328774],"about_ca_topic_score_codex":0.002596565,"about_ca_topic_score_gemma":0.0030163398,"teacher_disagreement_score":0.012727501,"about_ca_system_score_codex":0.0065997466,"about_ca_system_score_gemma":0.0042366437,"threshold_uncertainty_score":0.047884703},"labels":[],"label_agreement":null},{"id":"W3199586433","doi":"10.1007/s11356-021-16285-0","title":"RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates","year":2021,"lang":"en","type":"article","venue":"Environmental Science and Pollution Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":72,"is_retracted":true,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Tardiness; Metaheuristic; Computer science; Scheduling (production processes); Differential evolution; Mathematical optimization; Job shop scheduling; Industrial engineering; Engineering; Algorithm; Schedule; Mathematics","score_opus":0.03915713156073838,"score_gpt":0.2773286640349963,"score_spread":0.2381715324742579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3199586433","genre_codex":"editorial","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004449118,0.0033986743,0.022703424,0.07798249,0.8751566,0.000102641985,0.0020390141,0.0017649948,0.012402952],"genre_scores_gemma":[0.111728415,0.013630059,0.044956863,0.05199205,0.28958547,0.00031664746,0.01088057,0.0042030765,0.47270688],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99575186,0.0005709029,0.00046889813,0.00051590527,0.0023309893,0.00036146754],"domain_scores_gemma":[0.97673655,0.0061386703,0.00073036994,0.0012440674,0.013981027,0.001169293],"candidate_categories":["research_integrity"],"consensus_categories":[],"category_scores_codex":[0.0038980427,0.0013240958,0.0015291593,0.0020559847,0.002218732,0.0032843768,0.0041212845,0.0053066174,0.055728402],"category_scores_gemma":[0.02566143,0.00082654937,0.0011534514,0.0017309495,0.0014933037,0.0022737873,0.0022831692,0.004279527,0.021384375],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022033595,0.00005090905,0.0003847654,0.0002991786,0.00003670774,0.0013854632,0.00010540215,0.0009947933,0.0010446463,0.0020430868,0.95532453,0.03811013],"study_design_scores_gemma":[0.00007619311,0.00015240475,0.0025671402,0.00029686667,0.00009512665,0.0016334963,0.0002528537,0.005406537,0.003391863,0.0044524907,0.98159045,0.00008455706],"about_ca_topic_score_codex":0.012219753,"about_ca_topic_score_gemma":0.014309597,"teacher_disagreement_score":0.9946934,"about_ca_system_score_codex":0.0027949135,"about_ca_system_score_gemma":0.004255862,"threshold_uncertainty_score":0.1864301},"labels":[],"label_agreement":null},{"id":"W3200509981","doi":"","title":"Proceedings of the Thirtieth International Conference on Automated Planning and Scheduling, Nancy, France, October 26-30, 2020.","year":2020,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Scheduling (production processes); Computer science; Operations research; History; Library science; Engineering; Operations management","score_opus":0.013159162006999903,"score_gpt":0.2242178395830673,"score_spread":0.2110586775760674,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3200509981","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017628632,0.046878725,0.57664996,0.023389561,0.04595485,0.000901591,0.020638617,0.025583785,0.24237438],"genre_scores_gemma":[0.06631071,0.024581084,0.27408096,0.0019096633,0.0051942486,0.00081271515,0.059186287,0.0052243024,0.5627],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99876535,0.0003898351,0.000053051957,0.00024758745,0.00040465905,0.00013944642],"domain_scores_gemma":[0.9967084,0.0009169282,0.00006758287,0.00067433866,0.0011848253,0.00044785105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044003865,0.0020666244,0.0018569113,0.0017867687,0.00092626264,0.0034002527,0.0020705834,0.0012051245,0.10897541],"category_scores_gemma":[0.004360477,0.00067786477,0.0009933487,0.00168642,0.0008788882,0.0024243374,0.0017526738,0.0019430409,0.04574252],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005485201,0.00020839726,0.000595353,0.00024959852,0.000079292106,0.000083283696,0.00006874317,0.007447371,0.002016827,0.0068980744,0.7260367,0.25576782],"study_design_scores_gemma":[0.000107077896,0.00020168723,0.0023991482,0.00020453558,0.000060470637,0.00018491418,0.00013457361,0.052104708,0.0026534724,0.019969651,0.9219459,0.00003391199],"about_ca_topic_score_codex":0.022877552,"about_ca_topic_score_gemma":0.032499507,"teacher_disagreement_score":0.10897541,"about_ca_system_score_codex":0.0023346038,"about_ca_system_score_gemma":0.004585962,"threshold_uncertainty_score":0.36455905},"labels":[],"label_agreement":null},{"id":"W3201902753","doi":"10.3390/buildings11100456","title":"Framing and Evaluating the Best Practices of IFC-Based Automated Rule Checking: A Case Study","year":2021,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"National Natural Science Foundation of China","keywords":"Computer science; Framing (construction); Rule-based system; Software engineering; Systems engineering; Engineering; Artificial intelligence","score_opus":0.04849163021983045,"score_gpt":0.34372690978734505,"score_spread":0.2952352795675146,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3201902753","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6483925,0.0018915212,0.29654953,0.0031188931,0.00015361863,0.0031152898,0.00044348725,0.0010736174,0.045261543],"genre_scores_gemma":[0.59834224,0.00079085515,0.39701098,0.00025290102,0.00002569624,0.00080376526,0.00037183223,0.00022512002,0.0021765635],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.93667316,0.042925548,0.0030570482,0.0028059445,0.012130481,0.0024077306],"domain_scores_gemma":[0.8647038,0.094708,0.0047033574,0.019075666,0.015610318,0.0011988174],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.051234648,0.0010457304,0.0010051511,0.0062561412,0.003332758,0.007212758,0.004426163,0.0039070086,0.0021410985],"category_scores_gemma":[0.08289246,0.00083291443,0.0010001466,0.004536702,0.0058272122,0.006268432,0.0046805316,0.0025973853,0.00075296673],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010450993,0.0048204996,0.043253332,0.0029362629,0.00019572518,0.0063707647,0.080139905,0.072781466,0.016785942,0.1379555,0.0067414357,0.62697417],"study_design_scores_gemma":[0.0007481789,0.004502582,0.028021669,0.007121069,0.00059821666,0.0073312065,0.119892135,0.42361367,0.11147767,0.079675786,0.2160887,0.0009290969],"about_ca_topic_score_codex":0.007989673,"about_ca_topic_score_gemma":0.0100274775,"teacher_disagreement_score":0.051234648,"about_ca_system_score_codex":0.006126447,"about_ca_system_score_gemma":0.005451058,"threshold_uncertainty_score":0.27095795},"labels":[],"label_agreement":null},{"id":"W3202151048","doi":"10.1007/978-3-030-88207-5_11","title":"Integrating 4D Simulations and Virtual Reality Environments: An Innovative Prototype","year":2021,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science; Virtual reality; Human–computer interaction; Computer graphics (images)","score_opus":0.015445849310168557,"score_gpt":0.2409989838705758,"score_spread":0.22555313456040724,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202151048","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.074466415,0.0003778861,0.8857358,0.0004954202,0.00037635883,0.0006868131,0.00031878226,0.010566611,0.026975935],"genre_scores_gemma":[0.2602941,0.00049137214,0.6945844,0.0003208823,0.00005580673,0.00072795176,0.0005866147,0.0012696442,0.04166918],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993869,0.00015113606,0.000026157526,0.00008098391,0.00028946824,0.000065194836],"domain_scores_gemma":[0.9994772,0.00019230509,0.000016125727,0.0001218649,0.00010933738,0.000083139916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00089063693,0.0009657601,0.00058894715,0.0005610778,0.00044676915,0.0017418896,0.0043186843,0.0019252617,0.017532656],"category_scores_gemma":[0.0010806739,0.0009281072,0.00088748947,0.00042628753,0.00062299124,0.0017393287,0.0025553908,0.0008857939,0.003263808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015526755,0.0026570887,0.0021538804,0.0008235218,0.0002208264,0.0022292056,0.0037768157,0.035265706,0.3311123,0.03378413,0.021529071,0.5648948],"study_design_scores_gemma":[0.0009168622,0.0041802777,0.004416674,0.00040681596,0.00045427398,0.0047958894,0.0012187527,0.37891173,0.25319308,0.016979354,0.33416006,0.0003662063],"about_ca_topic_score_codex":0.0010852856,"about_ca_topic_score_gemma":0.0009657121,"teacher_disagreement_score":0.017532656,"about_ca_system_score_codex":0.00029559166,"about_ca_system_score_gemma":0.0006558657,"threshold_uncertainty_score":0.05865252},"labels":[],"label_agreement":null},{"id":"W3202501389","doi":"10.3390/logistics5040065","title":"Construction Site Layout Planning Using a Simulation-Based Decision Support Tool","year":2021,"lang":"en","type":"article","venue":"Logistics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Site planning; Site plan; Computer science; Page layout; Building information modeling; Engineering; Transport engineering; Construction engineering; Operations research; Urban planning; Regional planning; Civil engineering; Operations management","score_opus":0.03348528335128486,"score_gpt":0.2787379319780557,"score_spread":0.24525264862677082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3202501389","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03114618,0.000083624065,0.9554689,0.00019713123,0.00005080305,0.00022995447,0.0005581449,0.0045409133,0.0077244397],"genre_scores_gemma":[0.3849801,0.00032746312,0.6094472,0.00009427829,0.000022965036,0.00071145484,0.0010406553,0.00032177576,0.003054167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994803,0.00016568272,0.000052526644,0.00007328074,0.00017836616,0.00004979244],"domain_scores_gemma":[0.99865687,0.00079999916,0.00009910768,0.000113580616,0.00023064092,0.0000998369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010413622,0.0009906414,0.00077474175,0.0009099563,0.0005728012,0.0015146183,0.0015861674,0.0010967959,0.007967571],"category_scores_gemma":[0.0021705602,0.00066159683,0.0011569721,0.00073155115,0.0005427299,0.00093498704,0.001162705,0.000959987,0.000856504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055789187,0.00008200425,0.0007675054,0.000090419395,0.000029391464,0.00011281975,0.00009680818,0.97036964,0.002105173,0.0050257416,0.00093454175,0.020330073],"study_design_scores_gemma":[0.000024159393,0.0000149020525,0.00007571641,0.000013490489,0.000009053891,0.00001836732,0.000016487958,0.9954046,0.0009094135,0.0011331139,0.002370522,0.000010078388],"about_ca_topic_score_codex":0.0065288926,"about_ca_topic_score_gemma":0.005925061,"teacher_disagreement_score":0.007967571,"about_ca_system_score_codex":0.00090090407,"about_ca_system_score_gemma":0.0021359732,"threshold_uncertainty_score":0.026654124},"labels":[],"label_agreement":null},{"id":"W3204087375","doi":"10.22215/etd/2020-14216","title":"Geometric Accuracy of BIM-BEM Transformation Workflows: Bridging the State-of-the-Art and Practice","year":2020,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Workflow; Bridging (networking); Transformation (genetics); Building information modeling; Computer science; Domain (mathematical analysis); Stakeholder; Data exchange; Software engineering; Systems engineering; Database; Engineering; Operations management; Scheduling (production processes)","score_opus":0.009769552308510792,"score_gpt":0.23546798153970733,"score_spread":0.22569842923119654,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3204087375","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07482209,0.0028403245,0.85717845,0.004537419,0.00043566452,0.00020337578,0.00076738803,0.0032409863,0.055974316],"genre_scores_gemma":[0.62312424,0.0023760297,0.36374947,0.00020560654,0.000107218824,0.00013819577,0.0020575572,0.0018051178,0.0064366614],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98122555,0.0052992487,0.001122712,0.0013389096,0.010366247,0.00064736954],"domain_scores_gemma":[0.9640946,0.014958211,0.0015044501,0.010272637,0.008776272,0.0003938691],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018500136,0.0006919212,0.0009065851,0.002260871,0.0010626379,0.008549539,0.0029303227,0.0013868839,0.009281122],"category_scores_gemma":[0.084975235,0.0009036891,0.00089618715,0.0031355764,0.0020424488,0.0065822783,0.0049572866,0.0023257968,0.0033187084],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003014469,0.00016814744,0.009957463,0.0005600461,0.000086674336,0.00007099626,0.0034577493,0.20034644,0.003651261,0.10321095,0.011799412,0.6663894],"study_design_scores_gemma":[0.000066278524,0.00027476402,0.015026117,0.00082200265,0.00008155011,0.00027757118,0.0035170463,0.7236484,0.026859323,0.119660854,0.109540895,0.00022514323],"about_ca_topic_score_codex":0.010628356,"about_ca_topic_score_gemma":0.009706098,"teacher_disagreement_score":0.018500136,"about_ca_system_score_codex":0.003151511,"about_ca_system_score_gemma":0.0039388086,"threshold_uncertainty_score":0.097839236},"labels":[],"label_agreement":null},{"id":"W3205038720","doi":"10.54216/ijbes.010101","title":"An Exploratory Study of Building Information Modelling Maturity in the Construction Industry","year":2018,"lang":"en","type":"article","venue":"International Journal of BIM and Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Maturity (psychological); Capability Maturity Model; Building information modeling; Context (archaeology); Service Integration Maturity Model; Process (computing); Construction industry; Process management; Engineering; Business; Operations management; Computer science; Construction engineering; Geography; Political science","score_opus":0.011538917329220843,"score_gpt":0.23970903006106595,"score_spread":0.2281701127318451,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205038720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.991678,0.0030035027,0.00085865177,0.000404751,0.000007868221,0.00034983043,0.00020187596,0.0000036894205,0.0034917763],"genre_scores_gemma":[0.9916585,0.0042512,0.0023921926,0.0002468088,0.000008090819,0.0005341436,0.00017289039,0.0000072006546,0.0007289739],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99379575,0.0035845186,0.0007190475,0.00033095575,0.0011367488,0.00043308194],"domain_scores_gemma":[0.95043415,0.038478006,0.005398911,0.0006700592,0.0041517685,0.0008670855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013792498,0.00024204722,0.0006395939,0.0066710194,0.0015889247,0.0031175073,0.0005780771,0.0007854836,0.0024458438],"category_scores_gemma":[0.034096695,0.0005338068,0.0005768165,0.0084764175,0.0013442432,0.0049777613,0.0022255322,0.0010255704,0.00026667689],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026884986,0.0007797005,0.13839117,0.010300443,0.00015279106,0.0026176842,0.74809086,0.0003019176,0.0024486214,0.0069519966,0.0011541666,0.088541776],"study_design_scores_gemma":[0.000038051163,0.001027134,0.15951388,0.0061139413,0.0001751058,0.0009995013,0.80511165,0.0005313751,0.0010294523,0.0014669255,0.02393076,0.00006224066],"about_ca_topic_score_codex":0.0030552172,"about_ca_topic_score_gemma":0.008244995,"teacher_disagreement_score":0.013792498,"about_ca_system_score_codex":0.003201593,"about_ca_system_score_gemma":0.0059124674,"threshold_uncertainty_score":0.072942555},"labels":[],"label_agreement":null},{"id":"W3205073250","doi":"10.29173/mocs163","title":"Design and Specification Compilation of a Modularized Prefabricated High-rise Steel Frame Structure with Inclined Braces Part I: Integral Structural Design","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Natural Science Foundation of China; National Science Foundation","keywords":"Structural engineering; Steel frame; Structural system; Displacement (psychology); Frame (networking); Finite element method; High rise; Engineering; Computer science; Mechanical engineering","score_opus":0.01893120030751462,"score_gpt":0.1994693870305877,"score_spread":0.1805381867230731,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3205073250","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026912013,0.00011551483,0.9610213,0.00004268037,0.000038371414,0.0002675107,0.00033016788,0.0012135031,0.010059],"genre_scores_gemma":[0.30801445,0.00025511245,0.6768278,0.000053521155,0.000022664315,0.0005867164,0.0012901103,0.0003722808,0.012577392],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99955815,0.00005167067,0.000034621105,0.00006273127,0.00025155404,0.000041208415],"domain_scores_gemma":[0.9997739,0.000019513884,0.000030585736,0.000035928373,0.00012696674,0.000013131848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00039257845,0.00059020333,0.0003277408,0.00056686974,0.00020563552,0.00044557612,0.0008361931,0.00037099936,0.0027672653],"category_scores_gemma":[0.00030898253,0.00034610974,0.0006272714,0.00023133545,0.00029249114,0.00023823873,0.00036819102,0.00031974085,0.0010038051],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012843075,0.00010045894,0.0026961453,0.0009179009,0.00005858461,0.0008521194,0.0003878515,0.42521873,0.2864374,0.0379529,0.007400794,0.23784868],"study_design_scores_gemma":[0.000108133354,0.00087420037,0.0046093557,0.000111518966,0.00011635408,0.0012759675,0.00016741059,0.69573087,0.13027187,0.005314159,0.1613392,0.00008095292],"about_ca_topic_score_codex":0.0020246857,"about_ca_topic_score_gemma":0.0020045473,"teacher_disagreement_score":0.0027672653,"about_ca_system_score_codex":0.00031629213,"about_ca_system_score_gemma":0.0009287648,"threshold_uncertainty_score":0.009257436},"labels":[],"label_agreement":null},{"id":"W3206056695","doi":"10.32920/ryerson.14654898.v1","title":"The Use of Aerogel-Enhanced Blanket for Thermal Bridging Correction in Concrete and Steel Buildings","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Blanket; Aerogel; Thermal; Bridging (networking); Roof; Materials science; Structural engineering; Environmental science; Civil engineering; Computer science; Composite material; Engineering; Meteorology","score_opus":0.018379961113977418,"score_gpt":0.21968138277461793,"score_spread":0.20130142166064052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206056695","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8921705,0.00067018473,0.099843875,0.000057560883,0.00005517925,0.000025995894,0.00014624889,0.0004007252,0.0066297404],"genre_scores_gemma":[0.9818796,0.00018447904,0.01632414,0.000007826802,0.0000020965304,0.000008375356,0.000056435372,0.000039678474,0.0014973965],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99983394,0.00002760844,0.0000064884166,0.000028189048,0.000084605585,0.000019219942],"domain_scores_gemma":[0.99987483,0.000043914857,0.000020225923,0.000026646912,0.000026707643,0.000007688046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002735946,0.00032237777,0.00022749692,0.0003736597,0.00014234429,0.00043399291,0.00032590807,0.00038647585,0.00089547905],"category_scores_gemma":[0.0004582225,0.00015667849,0.000350963,0.0003372798,0.00020345548,0.000680844,0.0003723165,0.00021529071,0.00014140287],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003876539,0.00013998753,0.003948589,0.00048070314,0.000050896426,0.000490723,0.00021001686,0.33455774,0.573219,0.003982783,0.00047479567,0.08205719],"study_design_scores_gemma":[0.000023064831,0.0005290371,0.006853506,0.000047173562,0.000075180535,0.0003445742,0.00017073071,0.31784248,0.6638154,0.0011266997,0.009112357,0.000059865335],"about_ca_topic_score_codex":0.0006263413,"about_ca_topic_score_gemma":0.0015943721,"teacher_disagreement_score":0.00089547905,"about_ca_system_score_codex":0.00021099388,"about_ca_system_score_gemma":0.0001546955,"threshold_uncertainty_score":0.0029956698},"labels":[],"label_agreement":null},{"id":"W3206345388","doi":"10.5267/j.ijiec.2021.7.001","title":"MILP of multitask scheduling of geographically distributed maintenance tasks","year":2021,"lang":"en","type":"article","venue":"International Journal of Industrial Engineering Computations","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Computer science; Scheduling (production processes); Solver; Integer programming; Operations research; Vehicle routing problem; Mathematical optimization; Routing (electronic design automation); Distributed computing; Engineering; Computer network; Mathematics","score_opus":0.013708939168181906,"score_gpt":0.2302422794096966,"score_spread":0.2165333402415147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206345388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038764358,0.0009955378,0.9189234,0.0009812228,0.0002979615,0.0003461403,0.0021701972,0.00056928885,0.036951933],"genre_scores_gemma":[0.7539136,0.00096198515,0.22093527,0.00038491408,0.00012470348,0.0012644388,0.0018203802,0.00022576145,0.020368965],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992143,0.00029487725,0.000030320316,0.00012262538,0.00015523151,0.00018257297],"domain_scores_gemma":[0.9990344,0.00058966776,0.0001226393,0.000031111627,0.0001471182,0.000075072516],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010075815,0.0013662128,0.0011810586,0.0007525585,0.0005896102,0.0017016028,0.0012169541,0.0013572566,0.0072081126],"category_scores_gemma":[0.0022752783,0.00074344454,0.0009786782,0.0012089665,0.0005581689,0.00070866715,0.0011325119,0.0014699824,0.0007433957],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004393479,0.000016777794,0.00019285697,0.00008258375,0.000017001455,0.000096069176,0.000022567841,0.99066025,0.00027544747,0.004623869,0.0010898415,0.00287879],"study_design_scores_gemma":[0.000012746296,0.00002412565,0.00012345155,0.000016528236,0.000009975425,0.000017106408,0.00002435683,0.9951525,0.00016710433,0.0032255591,0.0012223674,0.000004262806],"about_ca_topic_score_codex":0.008861466,"about_ca_topic_score_gemma":0.0067376303,"teacher_disagreement_score":0.008861466,"about_ca_system_score_codex":0.0013149155,"about_ca_system_score_gemma":0.0018311361,"threshold_uncertainty_score":0.024113536},"labels":[],"label_agreement":null},{"id":"W3206861418","doi":"10.29173/mocs182","title":"Automation of Quantity Take-off for Modular Construction","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automation; Modular design; Computer science; Takeoff; Interface (matter); Process (computing); Purchasing; Building information modeling; Exploit; Modular programming; Industrial engineering; Software engineering; Database; Engineering drawing; Engineering; Operations management; Mechanical engineering; Operating system","score_opus":0.015974160699347744,"score_gpt":0.2132640815437478,"score_spread":0.19728992084440006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3206861418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06770469,0.00022398571,0.9004654,0.00014185651,0.0000689285,0.00042322878,0.00075326435,0.017591618,0.012627044],"genre_scores_gemma":[0.4265025,0.00032000328,0.56465614,0.000055292403,0.000041947307,0.00022146975,0.001983557,0.0014164342,0.004802724],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99809223,0.00034328335,0.00015338727,0.00029995994,0.0010036554,0.000107498025],"domain_scores_gemma":[0.99688643,0.000922389,0.00035447546,0.0010151631,0.0007456012,0.00007586775],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016051029,0.00096091756,0.0007891219,0.0026841776,0.00066387194,0.001961012,0.0011363941,0.00035327827,0.0074063963],"category_scores_gemma":[0.006794567,0.0005952147,0.0005052581,0.0018614968,0.000463931,0.0015757903,0.0017500577,0.00062453694,0.0028822112],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034874454,0.0002280782,0.008096271,0.000391213,0.000031438507,0.0003451845,0.001206895,0.010889966,0.05569239,0.0069192788,0.0086439485,0.9072066],"study_design_scores_gemma":[0.00016121498,0.0008372382,0.06736894,0.00039181052,0.00015941505,0.0026707577,0.002081278,0.44401112,0.31352624,0.028348671,0.14003102,0.00041235588],"about_ca_topic_score_codex":0.0016832255,"about_ca_topic_score_gemma":0.0021498546,"teacher_disagreement_score":0.0074063963,"about_ca_system_score_codex":0.0004330127,"about_ca_system_score_gemma":0.0010792449,"threshold_uncertainty_score":0.024776816},"labels":[],"label_agreement":null},{"id":"W3208380864","doi":"10.46421/sibragec.v11i00.33","title":"Sistema Last Planner X Advanced Work Packaging","year":2021,"lang":"en","type":"article","venue":"Simpósio Brasileiro de Gestão e Economia da Construção/Anais do ... Simpósio Brasileiro de Gestão e Economia da Construção","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Planner; Work (physics); General partnership; Consolidation (business); Engineering management; Process management; Process (computing); Computer science; Field (mathematics); Work systems; Work in process; Knowledge management; Engineering; Construction engineering; Architectural engineering; Operations research; Business; Operations management; Artificial intelligence; Mechanical engineering","score_opus":0.012430653590184968,"score_gpt":0.220360127099606,"score_spread":0.20792947350942104,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3208380864","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0341242,0.001131032,0.5817856,0.0014011567,0.0004349963,0.0017800829,0.0025052477,0.021751987,0.35508576],"genre_scores_gemma":[0.16505834,0.0015522091,0.705614,0.00034318547,0.00015530664,0.0014844664,0.0057534645,0.0013873349,0.11865171],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9966633,0.0009835436,0.00024850972,0.0006042004,0.00132298,0.0001774089],"domain_scores_gemma":[0.9981523,0.00050526997,0.00022480109,0.0005515257,0.00043904243,0.00012704325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038185022,0.001004002,0.00062261435,0.0028147455,0.0014697228,0.0059490614,0.0009569985,0.00095525983,0.038140487],"category_scores_gemma":[0.0035061697,0.00072352594,0.0007372529,0.0032772867,0.0013489756,0.0039109187,0.003403295,0.0011621485,0.023962775],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027994218,0.00027269372,0.00556152,0.00050518126,0.000031071864,0.0003213718,0.0024596117,0.0044533317,0.004438701,0.10559156,0.030689657,0.8453954],"study_design_scores_gemma":[0.00017906456,0.00052194396,0.0076738247,0.00052260014,0.000046937737,0.000887061,0.0021171977,0.02476874,0.010987655,0.036176197,0.9159953,0.00012346367],"about_ca_topic_score_codex":0.005034255,"about_ca_topic_score_gemma":0.005028891,"teacher_disagreement_score":0.038140487,"about_ca_system_score_codex":0.0014409531,"about_ca_system_score_gemma":0.0039173737,"threshold_uncertainty_score":0.12759262},"labels":[],"label_agreement":null},{"id":"W3209474283","doi":"10.46421/sibragec.v11i00.72","title":"Resultados obtidos com a aplicação da polivalência da mão de obra na construção civil: revisão sistemática","year":2021,"lang":"en","type":"article","venue":"Simpósio Brasileiro de Gestão e Economia da Construção/Anais do ... Simpósio Brasileiro de Gestão e Economia da Construção","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Workforce; Context (archaeology); Relevance (law); Economic shortage; Productivity; Work (physics); Resistance (ecology); Knowledge management; Computer science; Political science; Engineering; Economics; Economic growth; Geography; Mechanical engineering","score_opus":0.018130672120923595,"score_gpt":0.24029072196194365,"score_spread":0.22216004984102006,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3209474283","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26642486,0.44271562,0.031483907,0.014603983,0.0024649163,0.0021420794,0.010666903,0.00055030436,0.22894748],"genre_scores_gemma":[0.7529266,0.20732976,0.026935523,0.0013188845,0.000567723,0.0010512888,0.0026929963,0.00028338397,0.00689385],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9773727,0.010432134,0.0033783212,0.0019947975,0.00606944,0.00075260294],"domain_scores_gemma":[0.85828316,0.110457785,0.0059296098,0.003346765,0.021312768,0.00066989387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029227119,0.0012966224,0.0026223762,0.02050434,0.0022301695,0.010580502,0.0012290118,0.0013387519,0.014442048],"category_scores_gemma":[0.101387344,0.0008138671,0.003974476,0.032242794,0.003458552,0.0052702334,0.0030533164,0.0019088492,0.00176096],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006539721,0.00026896622,0.08672502,0.108711116,0.00208324,0.0016867528,0.072557494,0.0025129835,0.002234917,0.04607009,0.015280665,0.6612148],"study_design_scores_gemma":[0.00018955325,0.00087418925,0.16229302,0.14112121,0.014645378,0.003031798,0.16301234,0.004466272,0.006786713,0.03594212,0.46735838,0.00027901345],"about_ca_topic_score_codex":0.023749014,"about_ca_topic_score_gemma":0.028691627,"teacher_disagreement_score":0.029227119,"about_ca_system_score_codex":0.007604441,"about_ca_system_score_gemma":0.012212993,"threshold_uncertainty_score":0.15456963},"labels":[],"label_agreement":null},{"id":"W3210522541","doi":"10.1139/cjce-2020-0429","title":"Generating labour cost budget for a construction-oriented fabrication facility: simulation-based resource scheduling approach","year":2021,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Scheduling (production processes); Crew; Productivity; Operations research; Procurement; Discrete event simulation; Resource (disambiguation); Computer science; Resource planning; Operations management; Engineering; Economics; Simulation; Environmental resource management","score_opus":0.009984921706282481,"score_gpt":0.1969567984652056,"score_spread":0.18697187675892313,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3210522541","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018970463,0.00007002423,0.9782226,0.00007078212,0.000017235687,0.00006631994,0.00007841916,0.00021747088,0.0022867594],"genre_scores_gemma":[0.6044012,0.0002538006,0.39246112,0.000032885608,0.000021146641,0.0004178931,0.0002718288,0.0001249068,0.0020152554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955624,0.0001614546,0.000026087115,0.00006165849,0.00012671303,0.00006782712],"domain_scores_gemma":[0.99926764,0.0003776148,0.0000970773,0.000050540824,0.0001513892,0.00005566823],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010094437,0.00069705787,0.0007820372,0.001108988,0.0003820327,0.0008693214,0.001122663,0.0005788421,0.0022794239],"category_scores_gemma":[0.0021542504,0.0006327671,0.0006950728,0.001221143,0.00027527937,0.00072169787,0.00063360773,0.0005429467,0.00020729523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023281895,0.000016647662,0.00042458437,0.000024524423,0.00001164102,0.000021526792,0.000027031305,0.9840157,0.00087002775,0.0024482778,0.00017226879,0.011944422],"study_design_scores_gemma":[0.00000382033,0.000006919011,0.00009140471,0.0000037593231,0.0000042165148,0.000004475987,0.000009373867,0.99866045,0.00029457192,0.00062421506,0.00029328838,0.0000034685524],"about_ca_topic_score_codex":0.015628692,"about_ca_topic_score_gemma":0.0127490945,"teacher_disagreement_score":0.015628692,"about_ca_system_score_codex":0.0013476915,"about_ca_system_score_gemma":0.0026188442,"threshold_uncertainty_score":0.031075478},"labels":[],"label_agreement":null},{"id":"W3211426857","doi":"10.32920/ryerson.14649519.v1","title":"Investigating building information model to building energy model data transfer integrity and simulation results","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Sciencetech (Canada); University of Waterloo","funders":"Lawrence Berkeley National Laboratory; Construction Industry Council; U.S. General Services Administration; U.S. Department of Energy","keywords":"Building information modeling; Reliability (semiconductor); Building energy simulation; Computer science; Process (computing); Energy modeling; Reliability engineering; Energy (signal processing); Efficient energy use; Energy performance; Simulation; Engineering; Operating system","score_opus":0.058715359176305736,"score_gpt":0.27941112992775324,"score_spread":0.2206957707514475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3211426857","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8806947,0.00017865053,0.09690685,0.00035837007,0.00006999786,0.00018986662,0.0023915959,0.006441622,0.012768255],"genre_scores_gemma":[0.96780896,0.00007809546,0.027156722,0.00003415032,0.000006715048,0.00007743526,0.003041095,0.00076185353,0.0010350419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99529856,0.0014498621,0.0003522016,0.0005396179,0.0020845148,0.00027533167],"domain_scores_gemma":[0.9787346,0.009500478,0.0008343412,0.0054051676,0.0052811904,0.0002443067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006858784,0.00085804577,0.0007641092,0.001311764,0.0006224007,0.0019498856,0.0013878358,0.0007257671,0.0046368497],"category_scores_gemma":[0.032794446,0.0005863757,0.0008541462,0.0015047244,0.0007138178,0.0021857698,0.0015075317,0.0011646193,0.0013235058],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018177618,0.0009842898,0.06037707,0.00040180373,0.00023093692,0.00030062717,0.0010919519,0.81059855,0.020420672,0.009107496,0.0032104994,0.091458276],"study_design_scores_gemma":[0.0000558919,0.00026440757,0.013797936,0.000045740355,0.00005939406,0.00007341402,0.0003759868,0.93163,0.048900288,0.0012259762,0.003535326,0.00003570653],"about_ca_topic_score_codex":0.0125966985,"about_ca_topic_score_gemma":0.005350877,"teacher_disagreement_score":0.0125966985,"about_ca_system_score_codex":0.0014168472,"about_ca_system_score_gemma":0.0013290828,"threshold_uncertainty_score":0.03627312},"labels":[],"label_agreement":null},{"id":"W3212254029","doi":"10.5281/zenodo.4762238","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212254029","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034711196,0.00033953076,0.030935701,0.00078744086,0.00021081883,0.0008859111,0.9299632,0.008294851,0.025111444],"genre_scores_gemma":[0.009928906,0.0004457564,0.07022657,0.00025508978,0.000046846675,0.0014280237,0.90864307,0.0010461608,0.00797958],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99707687,0.0003446625,0.0007623473,0.00049025397,0.0011110997,0.00021479976],"domain_scores_gemma":[0.98979026,0.0014057495,0.0008410464,0.0027559288,0.004442826,0.0007640988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029069022,0.0007381218,0.0010195854,0.008231574,0.0012581934,0.003633481,0.0027215313,0.0013414781,0.044899315],"category_scores_gemma":[0.010806245,0.0006667201,0.0012641348,0.014887295,0.00038637267,0.0054587284,0.0029125009,0.0019955568,0.030614028],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018900775,0.00014425677,0.0104836505,0.0010881562,0.0000635002,0.0001534481,0.00083881395,0.0016517016,0.0019535753,0.016651979,0.8390946,0.12768729],"study_design_scores_gemma":[0.00002610555,0.000017878356,0.012323842,0.00022131324,0.000022050477,0.000078631696,0.00055891793,0.0019579378,0.0009900011,0.004243125,0.979508,0.000052141368],"about_ca_topic_score_codex":0.0687276,"about_ca_topic_score_gemma":0.090087146,"teacher_disagreement_score":0.0687276,"about_ca_system_score_codex":0.0042837025,"about_ca_system_score_gemma":0.007737712,"threshold_uncertainty_score":0.15020317},"labels":[],"label_agreement":null},{"id":"W3212424951","doi":"10.18280/ijsse.110506","title":"Numerical and Experimental Predication of the Structural Cracking Within Reinforced Concrete Structure due to Conventional State of Loading","year":2021,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cracking; Structural engineering; Finite element method; Service life; Deformation (meteorology); Ultimate load; Engineering; Computer science; Materials science; Mechanical engineering","score_opus":0.003372532241752602,"score_gpt":0.20807920609142402,"score_spread":0.20470667384967142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3212424951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9953772,0.000034388093,0.003352355,0.000011792509,0.000010425847,0.0000073876263,0.00006705857,0.000051377705,0.0010880686],"genre_scores_gemma":[0.9983766,0.000027178039,0.001094873,0.0000023335579,0.000001728793,0.000007476791,0.000044124157,0.000004053671,0.00044155834],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999688,0.000032689142,0.00001715642,0.000049616105,0.00016201563,0.000050421677],"domain_scores_gemma":[0.9994617,0.00016669427,0.00008376273,0.00011761169,0.00012611672,0.000044095046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041058482,0.000261619,0.00016460932,0.00037484028,0.00019124303,0.0001713729,0.00025367027,0.00045476807,0.0013771848],"category_scores_gemma":[0.0007294606,0.00015712433,0.00021187344,0.00023422782,0.00050108973,0.00023000661,0.0002510673,0.00034438403,0.00017742155],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003463579,0.00040898283,0.014307254,0.00016422693,0.000019955503,0.00027102302,0.00056267926,0.0637767,0.90100414,0.0011049785,0.0003148474,0.017718773],"study_design_scores_gemma":[0.000030230214,0.0032698847,0.060008697,0.000042034426,0.00004795051,0.0003506345,0.00051399943,0.3226375,0.61068004,0.00056298217,0.0018080558,0.000048007383],"about_ca_topic_score_codex":0.0004887021,"about_ca_topic_score_gemma":0.00067268993,"teacher_disagreement_score":0.0013771848,"about_ca_system_score_codex":0.00011145035,"about_ca_system_score_gemma":0.000101962876,"threshold_uncertainty_score":0.0046072006},"labels":[],"label_agreement":null},{"id":"W3213414280","doi":"10.29173/mocs175","title":"BIM-enabled Modular and Industrialized Construction in China","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Industrialisation; China; Modular design; Productivity; Sustainable development; Business; Quality (philosophy); Resource (disambiguation); Industry of China; Engineering; Industrial organization; Economic growth; Computer science; Economics; Political science","score_opus":0.011775746094134386,"score_gpt":0.19460622450448378,"score_spread":0.18283047841034938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3213414280","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8554572,0.0047104014,0.044686504,0.0014874513,0.00008578982,0.00024740273,0.0005005092,0.000700932,0.09212383],"genre_scores_gemma":[0.9759798,0.0017343562,0.014264506,0.00007447895,0.000015896565,0.000045788896,0.00036517758,0.00002558701,0.00749433],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99907804,0.00012252203,0.000064123255,0.00011026527,0.00044738766,0.0001777794],"domain_scores_gemma":[0.99965835,0.00004103731,0.00005337706,0.00009136744,0.00009789422,0.00005807446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011607966,0.00045798358,0.00027096106,0.00212043,0.0008245225,0.001226868,0.00077847386,0.00037323518,0.0025440862],"category_scores_gemma":[0.0007407128,0.00027893556,0.00047680232,0.0040733805,0.0010667879,0.0011059301,0.0023483748,0.00024207422,0.00023121241],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000347304,0.00041241135,0.068124935,0.00086599967,0.00009959751,0.0026189436,0.005151788,0.07994948,0.016406765,0.124725215,0.008515859,0.6927817],"study_design_scores_gemma":[0.00017197173,0.00069859286,0.32969564,0.00035632518,0.00023913597,0.0016278842,0.004062984,0.26890984,0.022207506,0.032509904,0.33931488,0.00020538495],"about_ca_topic_score_codex":0.039341614,"about_ca_topic_score_gemma":0.044962335,"teacher_disagreement_score":0.039341614,"about_ca_system_score_codex":0.003991857,"about_ca_system_score_gemma":0.006809047,"threshold_uncertainty_score":0.078225255},"labels":[],"label_agreement":null},{"id":"W3214511002","doi":"10.1007/s12205-021-0972-2","title":"SEMA: A Site Equipment Management Assistant for Construction Management","year":2021,"lang":"en","type":"article","venue":"KSCE Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Usability; Interface (matter); Process (computing); Chatbot; Computer science; Engineering; Management system; Information management; Database; World Wide Web; Human–computer interaction; Operations management; Operating system","score_opus":0.005755252153903207,"score_gpt":0.19184277388290716,"score_spread":0.18608752172900395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3214511002","genre_codex":"software","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06635389,0.0006346205,0.3726288,0.0012150927,0.00048628813,0.0010395598,0.009192971,0.39603502,0.15241368],"genre_scores_gemma":[0.2225344,0.0006126915,0.49335924,0.0010081549,0.0002967436,0.0009270528,0.0135337915,0.015886107,0.25184175],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99920315,0.00013960736,0.000052790656,0.00014835977,0.00038660332,0.00006952436],"domain_scores_gemma":[0.9970305,0.00073638855,0.0001856696,0.00058301893,0.0009967474,0.00046769952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012816259,0.00074214884,0.00068367796,0.0020314308,0.00056186074,0.0010713842,0.0009820019,0.00047371068,0.08189033],"category_scores_gemma":[0.0036781419,0.00053684023,0.00029606774,0.0009841402,0.00022892538,0.0017914643,0.0017369053,0.00068833743,0.044951405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044291103,0.000421661,0.008871531,0.00022551115,0.00003586438,0.0004616002,0.0007217431,0.0006856735,0.020886883,0.001770303,0.22401255,0.74146384],"study_design_scores_gemma":[0.00026375023,0.00040002863,0.023472052,0.00015470161,0.00009411617,0.0025754948,0.001203744,0.03444702,0.031151298,0.003505304,0.9026025,0.0001299901],"about_ca_topic_score_codex":0.0007765523,"about_ca_topic_score_gemma":0.0022130895,"teacher_disagreement_score":0.08189033,"about_ca_system_score_codex":0.00031172298,"about_ca_system_score_gemma":0.0012192954,"threshold_uncertainty_score":0.27395046},"labels":[],"label_agreement":null},{"id":"W3215358485","doi":"10.1109/iri51335.2021.00039","title":"A Methodology and Tool for the Predictive Analysis of Cost Growth in Construction Projects","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science","score_opus":0.03260400988542194,"score_gpt":0.2671505703585518,"score_spread":0.23454656047312983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215358485","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037951781,0.000041499596,0.9891944,0.000087188004,0.000017663639,0.00009592043,0.000537297,0.0049273605,0.0013035099],"genre_scores_gemma":[0.09727611,0.00015878328,0.8991171,0.00005362522,0.000023243261,0.0006860412,0.0011351143,0.00038276365,0.0011672886],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9989631,0.0002709172,0.00009397571,0.00022458262,0.00038861463,0.00005884042],"domain_scores_gemma":[0.99463576,0.0039291997,0.00046657686,0.00035276095,0.0005485238,0.00006712298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027065342,0.0017666599,0.00062956987,0.0043440005,0.00058769423,0.001692213,0.0012756967,0.0009426146,0.0063976557],"category_scores_gemma":[0.012357185,0.0006874448,0.001312994,0.003141959,0.00051887834,0.0019270612,0.0011636169,0.0012609042,0.0013386691],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011121529,0.0002815501,0.008028108,0.00047138,0.00021532278,0.00039623844,0.00048481365,0.5347953,0.0050200275,0.037172724,0.011716276,0.40130717],"study_design_scores_gemma":[0.000016629105,0.000041693882,0.0014975789,0.000070276714,0.000025823863,0.00011215728,0.000074277355,0.96924746,0.002877959,0.018013258,0.00798539,0.000037546994],"about_ca_topic_score_codex":0.0056404592,"about_ca_topic_score_gemma":0.005281219,"teacher_disagreement_score":0.0063976557,"about_ca_system_score_codex":0.0009261303,"about_ca_system_score_gemma":0.0015947175,"threshold_uncertainty_score":0.0214023},"labels":[],"label_agreement":null},{"id":"W3215511319","doi":"10.1016/j.istruc.2021.11.018","title":"The twenty-first century of structural engineering research: A topic modeling approach","year":2021,"lang":"en","type":"article","venue":"Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Latent Dirichlet allocation; Topic model; Similarity (geometry); Theme (computing); Computer science; Data science; Political science; Library science; Information retrieval; World Wide Web; Artificial intelligence","score_opus":0.026256507621909186,"score_gpt":0.25096511795616727,"score_spread":0.2247086103342581,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3215511319","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03381923,0.13426243,0.40570617,0.08101937,0.0039171455,0.00018506902,0.00067125657,0.0004713471,0.33994797],"genre_scores_gemma":[0.65853465,0.10594793,0.14360352,0.008303526,0.004475915,0.0006686157,0.00053307606,0.0006319258,0.077300884],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99752766,0.001484734,0.00010964737,0.0003193531,0.00043230315,0.00012641898],"domain_scores_gemma":[0.99601525,0.00280669,0.00017086585,0.0003163096,0.00043215562,0.00025864618],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0049320753,0.0009439456,0.0011341225,0.006966338,0.0031110442,0.011645572,0.00210353,0.0029711232,0.008455928],"category_scores_gemma":[0.004950938,0.0006651734,0.0007640808,0.00678432,0.014948048,0.013215489,0.0031476559,0.0033116515,0.0010143076],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000088910465,0.000018083776,0.00018777371,0.000107806445,0.000008366021,0.000051705676,0.0029846374,0.0009165662,0.00008007423,0.9823682,0.0023176612,0.0109501695],"study_design_scores_gemma":[0.000009181638,0.000025166339,0.000478318,0.0003552641,0.000016284335,0.00015137407,0.004548053,0.0040192115,0.00018533388,0.73513913,0.25505465,0.000018111272],"about_ca_topic_score_codex":0.005789752,"about_ca_topic_score_gemma":0.0063396273,"teacher_disagreement_score":0.99303365,"about_ca_system_score_codex":0.0075462232,"about_ca_system_score_gemma":0.0053801564,"threshold_uncertainty_score":0.054751873},"labels":[],"label_agreement":null},{"id":"W3216806283","doi":"10.22260/isarc2021/0138","title":"Towards an Ontology for BIM-Based Robotic Navigation and Inspection Tasks","year":2021,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Building information modeling; Computer science; Scope (computer science); Robotics; Process (computing); Software engineering; Domain (mathematical analysis); Robot; Systems engineering; Artificial intelligence; Download; Human–computer interaction; World Wide Web; Engineering","score_opus":0.012603748065067347,"score_gpt":0.22960319666651893,"score_spread":0.2169994486014516,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3216806283","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005835405,0.00033819326,0.98097044,0.00088635535,0.00010796252,0.00037519675,0.000627926,0.00086005195,0.009998375],"genre_scores_gemma":[0.053180363,0.0008386456,0.9393072,0.0003349849,0.000037104546,0.0005265576,0.0026199329,0.00022330262,0.0029318207],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99673295,0.0009154524,0.0005246675,0.0003642383,0.0012378253,0.0002248641],"domain_scores_gemma":[0.99835,0.00040449307,0.00019836974,0.00033579115,0.0005675232,0.00014377841],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004105232,0.00080202246,0.00076203066,0.0030457738,0.0015910685,0.004259266,0.0019170638,0.0016305022,0.0016060843],"category_scores_gemma":[0.004044895,0.0008095468,0.002198777,0.0032329638,0.002175611,0.0060092895,0.0039675147,0.0028322847,0.0012323809],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009303872,0.00053833,0.0028262467,0.0011145428,0.00013006221,0.0011945012,0.006172116,0.038055353,0.01629521,0.69526005,0.013779673,0.22454089],"study_design_scores_gemma":[0.00005709419,0.00010614369,0.0036641986,0.0014725979,0.00023193446,0.0015665425,0.004316868,0.21245266,0.0102348095,0.2105449,0.55518115,0.00017108856],"about_ca_topic_score_codex":0.016515145,"about_ca_topic_score_gemma":0.016610064,"teacher_disagreement_score":0.016515145,"about_ca_system_score_codex":0.0023450714,"about_ca_system_score_gemma":0.0061297314,"threshold_uncertainty_score":0.032837987},"labels":[],"label_agreement":null},{"id":"W3217612868","doi":"10.29173/mocs169","title":"Analyzing Obstacles and Exploring Opportunities to Improve Modular Industrialized Construction in Lebanon","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Modular design; Flexibility (engineering); Engineering; Prefabrication; Quality (philosophy); Construction engineering; Construction management; Integrated project delivery; Sustainability; Investment (military); Architectural engineering; Business; Civil engineering; Computer science; Management","score_opus":0.06086250026510988,"score_gpt":0.22258994585369488,"score_spread":0.16172744558858498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217612868","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9848341,0.0008691664,0.00089350546,0.0017790614,0.000016122203,0.000039308634,0.000016156157,0.000005399417,0.011547271],"genre_scores_gemma":[0.99617624,0.0006251798,0.0011128308,0.0001541997,0.0000069699563,0.000021717302,0.000020906788,0.000003766279,0.0018781277],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9974982,0.0011385056,0.00006514676,0.00013411697,0.00041443718,0.0007495586],"domain_scores_gemma":[0.9983954,0.0006735374,0.00040243022,0.00004351453,0.00026738117,0.00021772562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036687753,0.00034870798,0.00021105062,0.0013582589,0.0039348598,0.0028279824,0.00075565756,0.00070987403,0.0028507188],"category_scores_gemma":[0.002451382,0.00028416092,0.00014160242,0.0016512988,0.0019405041,0.001777393,0.0023974925,0.00072031753,0.000143757],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003160941,0.00076084916,0.2709294,0.0012339917,0.000050050738,0.011660176,0.3531128,0.003711323,0.014160993,0.08480109,0.005414243,0.253849],"study_design_scores_gemma":[0.000018045695,0.00023864167,0.19186173,0.00080276397,0.00002232066,0.0004964612,0.711349,0.002173733,0.0020356243,0.004572073,0.08638265,0.00004698461],"about_ca_topic_score_codex":0.024391327,"about_ca_topic_score_gemma":0.08324306,"teacher_disagreement_score":0.024391327,"about_ca_system_score_codex":0.0097437715,"about_ca_system_score_gemma":0.007943445,"threshold_uncertainty_score":0.070696294},"labels":[],"label_agreement":null},{"id":"W3217648101","doi":"","title":"Planning for the Rehabilitation of Centre Block: The House’s Experience","year":2021,"lang":"en","type":"article","venue":"Canadian parliamentary review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Block (permutation group theory); Rehabilitation; Physical medicine and rehabilitation; Medicine; Physical therapy; Mathematics; Combinatorics","score_opus":0.01575758264006146,"score_gpt":0.23914664115309556,"score_spread":0.2233890585130341,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W3217648101","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058503866,0.45631066,0.0021244215,0.22661561,0.0055848607,0.0003640123,0.001979447,0.0000934148,0.24842367],"genre_scores_gemma":[0.55311936,0.33155748,0.0050896923,0.03569275,0.000838432,0.00018293619,0.0014511751,0.00015726486,0.07191102],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9896741,0.0014893343,0.00040927803,0.0003662351,0.0062476643,0.0018133868],"domain_scores_gemma":[0.9876374,0.0023587903,0.00045677897,0.0002772717,0.0076831086,0.0015866599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012005631,0.00044657965,0.00072134763,0.0027595034,0.007198145,0.0055243373,0.0028589692,0.0028687827,0.007038052],"category_scores_gemma":[0.014737045,0.000536633,0.0004265493,0.0066790474,0.0030888738,0.0013099562,0.002304941,0.0038210899,0.000486544],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019987985,0.00011826542,0.004959762,0.0052946806,0.00009060083,0.0012151761,0.013922756,0.0015780427,0.0009657869,0.08103214,0.39104092,0.49958205],"study_design_scores_gemma":[0.00001728514,0.0000327671,0.016888266,0.002732052,0.000067120716,0.00027251407,0.009105255,0.00012043295,0.00040974762,0.00083912537,0.9694686,0.00004677807],"about_ca_topic_score_codex":0.9568752,"about_ca_topic_score_gemma":0.989096,"teacher_disagreement_score":0.93011063,"about_ca_system_score_codex":0.06988938,"about_ca_system_score_gemma":0.26038268,"threshold_uncertainty_score":0.5070853},"labels":[],"label_agreement":null},{"id":"W334879000","doi":"","title":"Evaluation of Work Zone Strategies and User Delay Costs Associated with Strategies and Treatments","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto; University of Waterloo","funders":"","keywords":"Work (physics); Work zone; General partnership; Transport engineering; Agency (philosophy); Christian ministry; Key (lock); Plan (archaeology); Risk analysis (engineering); Public transport; Cost–benefit analysis; Ministry of Transport; Computer science; Engineering management; Operations research; Engineering; Business; Computer security; Finance","score_opus":0.012546642347738632,"score_gpt":0.2238502282136227,"score_spread":0.21130358586588405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W334879000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8673472,0.0011480366,0.11365474,0.0007294651,0.00005108546,0.0021663182,0.00062187255,0.00015790148,0.014123434],"genre_scores_gemma":[0.97788036,0.00023324613,0.020284683,0.000017386898,0.0000059438917,0.00042272435,0.00012550363,0.000015344733,0.0010147908],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9909565,0.0055890097,0.00045053693,0.00041261976,0.0019393113,0.00065199536],"domain_scores_gemma":[0.9548355,0.03778068,0.0026740176,0.001142136,0.002804762,0.0007629254],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0106662735,0.0008297758,0.0010793596,0.002618616,0.00045381603,0.0022067335,0.0012585345,0.0012359617,0.0053837686],"category_scores_gemma":[0.04713802,0.0003876797,0.0008740074,0.0015300739,0.0006132828,0.001577079,0.00093823986,0.0008961734,0.00030370505],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019776693,0.0012157847,0.018047646,0.00029979134,0.00020345283,0.00006832283,0.0002152607,0.7722488,0.0015129985,0.0125760045,0.0004623029,0.19117199],"study_design_scores_gemma":[0.00032270458,0.005328146,0.021007951,0.00016523291,0.00043410072,0.00011097075,0.0016127384,0.9454603,0.008164457,0.014624496,0.002684965,0.000083873274],"about_ca_topic_score_codex":0.004903409,"about_ca_topic_score_gemma":0.005671029,"teacher_disagreement_score":0.0106662735,"about_ca_system_score_codex":0.004343883,"about_ca_system_score_gemma":0.0037784688,"threshold_uncertainty_score":0.0564093},"labels":[],"label_agreement":null},{"id":"W34485052","doi":"10.1016/j.ijppaw.2021.08.006","title":"Evaluation of process simulate line simulation usage in early project phases","year":2008,"lang":"en","type":"dissertation","venue":"International Journal for Parasitology Parasites and Wildlife","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"U.S. Geological Survey","keywords":"Process (computing); Computer science; Line (geometry); Systems engineering; Engineering; Programming language; Mathematics","score_opus":0.03804212686690266,"score_gpt":0.40080368523167526,"score_spread":0.3627615583647726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W34485052","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77641046,0.00021028215,0.17665215,0.0004059395,0.00020839652,0.0019036663,0.0025105304,0.020067578,0.021630881],"genre_scores_gemma":[0.8858019,0.00007234159,0.109883964,0.00005764318,0.000008940531,0.00066644605,0.0013338102,0.00051306037,0.0016618362],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9975357,0.0013345693,0.00017110401,0.00030408686,0.00043161868,0.00022280207],"domain_scores_gemma":[0.98369724,0.009100253,0.0007684144,0.0018675115,0.003420449,0.0011461348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0074469205,0.00095235603,0.0005257139,0.0008908101,0.0004485757,0.0013693816,0.0016841631,0.0007901227,0.006318028],"category_scores_gemma":[0.022325829,0.0006203449,0.00057330396,0.00062682177,0.000274968,0.0013252394,0.0008727742,0.0008953998,0.0012831533],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0041235583,0.0025068389,0.055214163,0.00049080676,0.00022581502,0.00027008986,0.00074268633,0.7023327,0.007743472,0.0061995112,0.00648433,0.21366602],"study_design_scores_gemma":[0.0002952802,0.0006488255,0.0052818805,0.00005010821,0.00005551617,0.000028361268,0.00024798609,0.9837415,0.003798559,0.0010175497,0.004805959,0.000028481614],"about_ca_topic_score_codex":0.012101537,"about_ca_topic_score_gemma":0.0069354484,"teacher_disagreement_score":0.012101537,"about_ca_system_score_codex":0.0011604461,"about_ca_system_score_gemma":0.0024484047,"threshold_uncertainty_score":0.03938353},"labels":[],"label_agreement":null},{"id":"W367064978","doi":"10.22260/isarc2004/0076","title":"Integrated 3D Object Transformation and Simulation for Tower Crane Operations on Construction Sites","year":2004,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Neurosurgery Research and Education Foundation","keywords":"Lift (data mining); Computer science; Tower; Animation; Transformation (genetics); Computer graphics (images); 3D modeling; Engineering drawing; Model transformation; Simulation; Engineering; Structural engineering; Artificial intelligence","score_opus":0.011054884688218532,"score_gpt":0.22015913644642057,"score_spread":0.20910425175820205,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W367064978","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03682679,0.000038356353,0.9563624,0.00006014228,0.000020307863,0.00006876676,0.00012666611,0.0013485859,0.0051479843],"genre_scores_gemma":[0.60495114,0.00020921398,0.39048365,0.000033283937,0.00000928875,0.00022556087,0.00051355094,0.00043422967,0.0031400584],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999577,0.00010736326,0.000020464566,0.000035083092,0.00023398979,0.000026029504],"domain_scores_gemma":[0.99975044,0.000101388476,0.000021695865,0.00005343444,0.000057243364,0.000015798296],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00049683684,0.00051862915,0.0005337221,0.0006168622,0.0004305688,0.0009963205,0.0007586476,0.00067736174,0.0027983433],"category_scores_gemma":[0.0009487577,0.00046645734,0.0007656629,0.0005871399,0.00058607175,0.0007122739,0.0009184145,0.0004985701,0.0005933902],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006058382,0.000044543536,0.000938461,0.000035454996,0.000014841919,0.00007286606,0.00015774622,0.9598768,0.005395801,0.009941215,0.00031268923,0.023148995],"study_design_scores_gemma":[0.000008640176,0.00001943717,0.00018913689,0.000004976715,0.000004088779,0.000024463496,0.000023482424,0.99163014,0.003801217,0.0014530396,0.0028319217,0.00000947621],"about_ca_topic_score_codex":0.0072674616,"about_ca_topic_score_gemma":0.0073576756,"teacher_disagreement_score":0.0072674616,"about_ca_system_score_codex":0.00073600654,"about_ca_system_score_gemma":0.00097352563,"threshold_uncertainty_score":0.014450371},"labels":[],"label_agreement":null},{"id":"W39517586","doi":"10.3390/ma17215313","title":"Sustainable Tactical Planning for Road Infrastructure Management","year":2012,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"European Social Fund; Concordia University","keywords":"Business; Environmental planning; Transport engineering; Engineering; Geography","score_opus":0.005275889103929094,"score_gpt":0.2397005408172364,"score_spread":0.2344246517133073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W39517586","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021369543,0.0023626555,0.05496743,0.009374484,0.0005820283,0.00043542898,0.0020025019,0.0007024818,0.9082035],"genre_scores_gemma":[0.40393758,0.009524219,0.10953813,0.00072347425,0.00013244974,0.0004545845,0.0033769868,0.000366287,0.47194633],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997397,0.00006527652,0.000007508565,0.000026070313,0.000088889676,0.0000725246],"domain_scores_gemma":[0.9997948,0.000015285394,0.000015572607,0.000020588805,0.0001044599,0.00004930197],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036343484,0.00058682356,0.00021509765,0.0012125266,0.0023208957,0.0034741291,0.000727499,0.0007576423,0.043264885],"category_scores_gemma":[0.00072632596,0.00017285514,0.0002394411,0.0017302082,0.0005236152,0.001777146,0.0021169088,0.0010528127,0.0077144597],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003081573,0.00018033368,0.0045792665,0.00034632685,0.00003377478,0.00053243415,0.0019681351,0.018763253,0.0029773866,0.17229857,0.1478253,0.6504644],"study_design_scores_gemma":[0.0000044152953,0.00004719274,0.0041272603,0.00044204778,0.000017310715,0.00009492407,0.009679851,0.0056553413,0.0013090943,0.037690647,0.9409041,0.000027871323],"about_ca_topic_score_codex":0.026162805,"about_ca_topic_score_gemma":0.07653951,"teacher_disagreement_score":0.043264885,"about_ca_system_score_codex":0.0023973524,"about_ca_system_score_gemma":0.008094411,"threshold_uncertainty_score":0.14473552},"labels":[],"label_agreement":null},{"id":"W39773279","doi":"10.22260/isarc2013/0127","title":"Automatic Generation of BIM Using Parametric Family","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Caisson; Parametric statistics; Computer science; Process (computing); Parametric model; Parametric design; Engineering; Engineering drawing; Structural engineering; Operating system","score_opus":0.02715872810437804,"score_gpt":0.21026161080028583,"score_spread":0.1831028826959078,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W39773279","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008308721,0.00003866459,0.97894555,0.00003267805,0.000025798354,0.000089122936,0.0003469893,0.008685425,0.0035270078],"genre_scores_gemma":[0.21127072,0.00020177723,0.7752249,0.000053736465,0.000020339925,0.00040170734,0.0034681293,0.0052981116,0.004060522],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989636,0.00018246801,0.00006592036,0.00019250896,0.0005143957,0.00008103998],"domain_scores_gemma":[0.9987779,0.0004302674,0.00007546925,0.00030302728,0.00037257353,0.000040738858],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013146126,0.0013705081,0.00091354153,0.0020827923,0.00072429446,0.0013342623,0.0015038935,0.0007492561,0.009992878],"category_scores_gemma":[0.0032660782,0.0010748262,0.0019199209,0.0010507125,0.0005880267,0.0012942275,0.0021798282,0.0008980604,0.00396837],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002465886,0.0001600748,0.0035784035,0.000607669,0.00011545137,0.0008958268,0.0009754415,0.40372193,0.050353874,0.03020135,0.020141853,0.48900163],"study_design_scores_gemma":[0.000024223262,0.000059695838,0.0004347894,0.00004133299,0.0000291475,0.0003421239,0.00011833525,0.937038,0.022475353,0.0067641027,0.032624785,0.000048173064],"about_ca_topic_score_codex":0.0016390551,"about_ca_topic_score_gemma":0.0018775951,"teacher_disagreement_score":0.009992878,"about_ca_system_score_codex":0.0005837813,"about_ca_system_score_gemma":0.0009028582,"threshold_uncertainty_score":0.033429444},"labels":[],"label_agreement":null},{"id":"W41663545","doi":"10.22260/isarc2013/0030","title":"Simulation Applications in Construction Site Layout Planning","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Interdependence; Simulation modeling; Site planning; Download; Industrial engineering; Engineering; Engineering drawing; World Wide Web","score_opus":0.008611407247806728,"score_gpt":0.213155691069491,"score_spread":0.20454428382168427,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W41663545","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011389487,0.003294867,0.96239233,0.00064711756,0.00017098639,0.00011939825,0.00021889106,0.002089222,0.019677773],"genre_scores_gemma":[0.36905584,0.011585322,0.6037263,0.00018855032,0.0002440134,0.0005504481,0.00087884,0.0008233976,0.012947324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989214,0.0006419577,0.00007792913,0.000091763155,0.0002217493,0.000045294164],"domain_scores_gemma":[0.9981384,0.0013286963,0.000058063077,0.00015646295,0.00023151503,0.000086841246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012007047,0.00096105726,0.0011185127,0.0013408241,0.00057683105,0.0016346166,0.0009848276,0.0014199872,0.010311176],"category_scores_gemma":[0.0026674324,0.00079273817,0.0010472669,0.0029218683,0.0007304588,0.0010198423,0.0019482586,0.0012742329,0.002157151],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007623337,0.00008418323,0.0013818813,0.0002728835,0.00005726515,0.0002019208,0.00025613868,0.83748835,0.0024423043,0.035500597,0.004266168,0.117972136],"study_design_scores_gemma":[0.000022121529,0.000033570428,0.00030630437,0.00010229252,0.00001664788,0.000092708164,0.00007075927,0.9423703,0.0014026618,0.019653782,0.03590353,0.000025366426],"about_ca_topic_score_codex":0.0048185526,"about_ca_topic_score_gemma":0.0032235289,"teacher_disagreement_score":0.010311176,"about_ca_system_score_codex":0.0006971931,"about_ca_system_score_gemma":0.00096502603,"threshold_uncertainty_score":0.03449434},"labels":[],"label_agreement":null},{"id":"W4200190812","doi":"10.3390/su14010288","title":"Bim Machine Learning and Design Rules to Improve the Assembly Time in Steel Construction Projects","year":2021,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Duration (music); Parametric statistics; Camber (aerodynamics); Engineering; Construction engineering; Computer science; Manufacturing engineering; Industrial engineering; Systems engineering; Operations management; Structural engineering","score_opus":0.00610832271846377,"score_gpt":0.21942038119084675,"score_spread":0.213312058472383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200190812","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59405535,0.00035569406,0.38535196,0.00050785276,0.000026022215,0.00025041233,0.00054907106,0.0008281157,0.018075522],"genre_scores_gemma":[0.827445,0.00014719082,0.17051443,0.000031709023,0.000004270687,0.00012952632,0.00045294446,0.00005824056,0.0012168348],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.996079,0.002003238,0.00032079328,0.0004440622,0.0009809462,0.00017195506],"domain_scores_gemma":[0.9919532,0.0050979885,0.0011338365,0.0006591678,0.0010518965,0.000103907005],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005157981,0.0006489773,0.0006099481,0.0022931492,0.0006165122,0.0016606728,0.0012141631,0.0007045527,0.0018337946],"category_scores_gemma":[0.018760886,0.0005130757,0.00047974772,0.00292474,0.00068439636,0.0018276054,0.0009808177,0.0006995514,0.00041016666],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029522393,0.0008275975,0.039167553,0.0003650095,0.00007611954,0.00015559886,0.0018535996,0.4986718,0.0039769104,0.013589007,0.0018313039,0.4391903],"study_design_scores_gemma":[0.000023207353,0.00022435014,0.019590154,0.00011002969,0.00004614422,0.000076522614,0.0011703187,0.9578721,0.007138868,0.008644764,0.005061339,0.000042167772],"about_ca_topic_score_codex":0.007295342,"about_ca_topic_score_gemma":0.011567561,"teacher_disagreement_score":0.007295342,"about_ca_system_score_codex":0.0020163197,"about_ca_system_score_gemma":0.002488998,"threshold_uncertainty_score":0.027278304},"labels":[],"label_agreement":null},{"id":"W4200209404","doi":"10.2118/207380-ms","title":"Digitally Enabled Organizations- Leveraging New Age Technologies","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Arbutus Biopharma (Canada)","funders":"","keywords":"Computer science; Asset (computer security); Leverage (statistics); Context (archaeology); Process (computing); Process management; Risk analysis (engineering); Engineering; Computer security; Business","score_opus":0.0068351791014226925,"score_gpt":0.17580296657166916,"score_spread":0.16896778747024646,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200209404","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25795302,0.013508815,0.2265822,0.036026444,0.0014184382,0.00030261124,0.00020312142,0.0009588397,0.46304646],"genre_scores_gemma":[0.9202604,0.008542804,0.05087001,0.0011314974,0.00046348144,0.00010253153,0.000108480934,0.00007370308,0.018447043],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99828404,0.00064737455,0.00013065452,0.0001878379,0.00049846835,0.00025151746],"domain_scores_gemma":[0.99501556,0.0021747928,0.0006246509,0.0011597998,0.00040321573,0.00062207977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002828512,0.00034039075,0.00018849294,0.002517842,0.0013645601,0.011223231,0.0011231236,0.0018401545,0.005247146],"category_scores_gemma":[0.0045828503,0.0002856459,0.00042978371,0.0017695768,0.004163102,0.016119275,0.008100869,0.0011683912,0.0011179913],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005181423,0.0001280447,0.004495429,0.00032011254,0.0000321456,0.0011835984,0.0073751784,0.0047424035,0.0024806815,0.76585764,0.0049053105,0.20842767],"study_design_scores_gemma":[0.000028714612,0.00017926091,0.002793833,0.0006645171,0.00003494173,0.0009881065,0.008234304,0.010726167,0.0028601957,0.39441872,0.5790089,0.00006227445],"about_ca_topic_score_codex":0.00083445985,"about_ca_topic_score_gemma":0.0010303854,"teacher_disagreement_score":0.011223231,"about_ca_system_score_codex":0.0019800682,"about_ca_system_score_gemma":0.0016305713,"threshold_uncertainty_score":0.017553449},"labels":[],"label_agreement":null},{"id":"W4200505084","doi":"10.1108/jedt-05-2021-0287","title":"A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects","year":2021,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Plan (archaeology); Site planning; Engineering; Simple (philosophy); Computer science; Systems engineering; Construction engineering; Transport engineering; Civil engineering","score_opus":0.012456056153206494,"score_gpt":0.2337221742568084,"score_spread":0.22126611810360192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200505084","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0769497,0.00014856366,0.8930997,0.00029385352,0.000096747106,0.0005655571,0.0019816158,0.009424388,0.017439757],"genre_scores_gemma":[0.5076207,0.0003726771,0.48347428,0.00007974121,0.000020175448,0.0008486275,0.0019209293,0.0005487554,0.005114146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995234,0.00015859073,0.000054104847,0.00006662878,0.00015461678,0.00004266979],"domain_scores_gemma":[0.998659,0.0007544138,0.000102377744,0.00016208981,0.00022254643,0.00009953708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00096961757,0.0007413091,0.0005082185,0.0010376435,0.00048510495,0.0010755371,0.001287552,0.00074069016,0.009945458],"category_scores_gemma":[0.002637292,0.00050494855,0.0008450219,0.0007951288,0.00035737702,0.00091267325,0.0011088267,0.00071807625,0.0010531638],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001889461,0.00020762479,0.00439479,0.00034054308,0.000050522493,0.00045500978,0.0003311642,0.8831682,0.008348604,0.011102195,0.00472534,0.086687036],"study_design_scores_gemma":[0.00006704408,0.00007668118,0.0007118219,0.00008345577,0.000032873242,0.00009482164,0.000105406165,0.976791,0.0043474124,0.0032108875,0.014439847,0.00003868841],"about_ca_topic_score_codex":0.004482674,"about_ca_topic_score_gemma":0.0044204197,"teacher_disagreement_score":0.009945458,"about_ca_system_score_codex":0.0005852208,"about_ca_system_score_gemma":0.0017228606,"threshold_uncertainty_score":0.033270836},"labels":[],"label_agreement":null},{"id":"W4200618909","doi":"10.18280/mmep.080605","title":"Durability Control of Brickwork's Material Including Operation Parameters of the Building Enclosure","year":2021,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Durability; Brickwork; Brick; Enclosure; Building material; Corrosion; Material properties; Process (computing); Process engineering; Mechanical engineering; Construction engineering; Computer science; Materials science; Engineering; Forensic engineering; Environmental science; Civil engineering; Composite material","score_opus":0.01629526987443526,"score_gpt":0.19366930281186656,"score_spread":0.17737403293743131,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4200618909","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.524946,0.00055537076,0.46873683,0.000039003673,0.00003495213,0.000040959825,0.00006003429,0.0006006083,0.004986322],"genre_scores_gemma":[0.9824441,0.00010602722,0.016597394,0.0000057434204,0.00000669873,0.000015134524,0.000021932368,0.000025392836,0.0007776446],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999739,0.00003079904,0.000012718243,0.00007779161,0.00011763535,0.000022033219],"domain_scores_gemma":[0.99954695,0.00018688262,0.00007932776,0.00009407961,0.00007862925,0.00001410327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038992282,0.00028842792,0.0003991469,0.00029014703,0.00017188954,0.00044926532,0.00041916012,0.00026075018,0.000873173],"category_scores_gemma":[0.00095211464,0.00016769911,0.00026689997,0.00015590206,0.00024987446,0.00036049332,0.00022239049,0.00020637996,0.00021359224],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020350031,0.00007827982,0.0031827749,0.00021002657,0.00001972768,0.00006745344,0.000191591,0.04293887,0.83312887,0.0009900355,0.00016652035,0.11882233],"study_design_scores_gemma":[0.000015251109,0.0004687373,0.014959773,0.000019631952,0.000047057165,0.00024559107,0.00010032038,0.32649308,0.65390015,0.0007175734,0.0029909215,0.00004182103],"about_ca_topic_score_codex":0.00033687634,"about_ca_topic_score_gemma":0.00058756646,"teacher_disagreement_score":0.000873173,"about_ca_system_score_codex":0.00019081026,"about_ca_system_score_gemma":0.00014495813,"threshold_uncertainty_score":0.0029210448},"labels":[],"label_agreement":null},{"id":"W4206504907","doi":"10.4236/ojapps.2022.121006","title":"Building Information Modeling for Environmental Impact Assessment in Early Design Phases: A Literature Review","year":2022,"lang":"en","type":"review","venue":"Open Journal of Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Building information modeling; Process (computing); Life-cycle assessment; Bridge (graph theory); Environmental impact assessment; Relation (database); Architectural engineering; Engineering; Engineering design process; Systems engineering; Computer science; Construction engineering; Operations management; Mechanical engineering","score_opus":0.05630698621511863,"score_gpt":0.3582986963300026,"score_spread":0.30199171011488396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206504907","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00060124206,0.99305254,0.0023502668,0.0005422862,0.00014815964,0.000059147624,0.00011219795,0.000025520772,0.0031086085],"genre_scores_gemma":[0.0034609155,0.99329823,0.002529627,0.00020008667,0.00008242799,0.00005570606,0.00012938207,0.000007662151,0.00023608257],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99823844,0.00055026344,0.00032617018,0.00016417439,0.0006463746,0.00007457374],"domain_scores_gemma":[0.9911675,0.0066599282,0.00055624405,0.00015831242,0.0013612217,0.000096799],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003009462,0.0014013528,0.0017887139,0.008325615,0.00060450454,0.0028359718,0.0018029631,0.0017948664,0.004608601],"category_scores_gemma":[0.0069424706,0.0007409758,0.0019173075,0.013948488,0.0007151077,0.0033991716,0.0011393782,0.0011572129,0.0013823017],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005017215,0.00013931566,0.00086682563,0.11621041,0.00030287128,0.0003402978,0.00058935955,0.0028305233,0.00064857415,0.009515012,0.015792955,0.85271364],"study_design_scores_gemma":[0.000025284735,0.00017421246,0.003933531,0.13889167,0.0020404041,0.0013865626,0.0011478751,0.0030870005,0.0013592935,0.00822486,0.8396173,0.000112041715],"about_ca_topic_score_codex":0.0056678546,"about_ca_topic_score_gemma":0.006803339,"teacher_disagreement_score":0.008325615,"about_ca_system_score_codex":0.0012990179,"about_ca_system_score_gemma":0.0057490636,"threshold_uncertainty_score":0.015915751},"labels":[],"label_agreement":null},{"id":"W4206790465","doi":"10.3390/buildings12020098","title":"Selecting Appropriate Risk Response Strategies Considering Utility Function and Budget Constraints: A Case Study of a Construction Company in Iran","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Solver; Metaheuristic; Project management; Mathematical optimization; Computer science; Engineering; Operations research; Algorithm; Mathematics; Systems engineering","score_opus":0.015423267962186099,"score_gpt":0.22964972910791157,"score_spread":0.21422646114572547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4206790465","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9704121,0.0003072754,0.020730743,0.00043360904,0.000016651482,0.0002108321,0.000142462,0.0000391948,0.0077070585],"genre_scores_gemma":[0.98998356,0.00018782103,0.008479918,0.00001868446,0.000006209753,0.000060165443,0.00006012586,0.000010172962,0.0011932252],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99856097,0.0007486871,0.000040710824,0.00010890377,0.00023200212,0.00030870622],"domain_scores_gemma":[0.99730194,0.0018796235,0.00028166495,0.00008380257,0.00028203533,0.00017099098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025473784,0.0010711811,0.0006282404,0.0011749526,0.0011184099,0.0014964339,0.0012821516,0.0018091783,0.0018669777],"category_scores_gemma":[0.0032799917,0.0003868677,0.00093038566,0.0012420038,0.0008293711,0.0009981409,0.0009068901,0.0011153967,0.00014838275],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003530633,0.001008917,0.024697095,0.0003133814,0.00012819452,0.004797244,0.00061976066,0.92985356,0.0032053199,0.008166814,0.001685425,0.025171252],"study_design_scores_gemma":[0.00013959433,0.0007563437,0.016346548,0.00006322228,0.00014333533,0.00066515984,0.0039014323,0.9675331,0.0036478913,0.004138837,0.0025938232,0.00007069117],"about_ca_topic_score_codex":0.019752158,"about_ca_topic_score_gemma":0.02211774,"teacher_disagreement_score":0.019752158,"about_ca_system_score_codex":0.0024934807,"about_ca_system_score_gemma":0.0020322353,"threshold_uncertainty_score":0.039274335},"labels":[],"label_agreement":null},{"id":"W4207013828","doi":"10.1061/(asce)co.1943-7862.0002250","title":"Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Canadian Natural Resources","funders":"","keywords":"Adaptive neuro fuzzy inference system; Computer science; Machine learning; Artificial intelligence; Artificial neural network; Fuzzy logic; Neuro-fuzzy; Inference; Data mining; Fuzzy control system","score_opus":0.0044025748185134534,"score_gpt":0.1593667130382603,"score_spread":0.15496413821974686,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4207013828","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09391422,0.001275537,0.8741572,0.0008098745,0.00014023115,0.00013234129,0.00031552973,0.0003770318,0.028878026],"genre_scores_gemma":[0.9462358,0.0004523779,0.043631006,0.00008687685,0.000028020702,0.0002278946,0.00015418636,0.00001946849,0.0091644935],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99970156,0.000090298614,0.000013264804,0.00007932262,0.00007185885,0.000043705673],"domain_scores_gemma":[0.9997936,0.00009571882,0.00002631969,0.000009725839,0.000063283594,0.000011343452],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046401724,0.0007525155,0.0006237208,0.0007444949,0.00046946894,0.0010221364,0.0013954897,0.0014530988,0.002271855],"category_scores_gemma":[0.0008562253,0.00026779386,0.00074189535,0.00067010813,0.00048786617,0.0005594568,0.0006457831,0.00075035973,0.00029168106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000110330475,0.000013156284,0.00056917925,0.000016048474,0.00002077849,0.000062495266,0.00002557173,0.9898261,0.00035820837,0.003530402,0.00018264777,0.0053842827],"study_design_scores_gemma":[0.0000019727345,0.000009573384,0.00015761376,0.0000037087962,0.000004701001,0.000008299965,0.0000068058207,0.9986577,0.00007189439,0.00087736023,0.00019687916,0.0000034819525],"about_ca_topic_score_codex":0.020388076,"about_ca_topic_score_gemma":0.016227907,"teacher_disagreement_score":0.020388076,"about_ca_system_score_codex":0.0010806894,"about_ca_system_score_gemma":0.0010617656,"threshold_uncertainty_score":0.040538788},"labels":[],"label_agreement":null},{"id":"W4210503480","doi":"10.1007/978-981-16-6932-3_44","title":"VPL Prototypes for Determining Disassembly Parameters of BIM Models","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Building information modeling; Reuse; Computer science; Interface (matter); Systems engineering; Information model; Engineering; Software engineering; Scheduling (production processes)","score_opus":0.01566586439022928,"score_gpt":0.20586542830894747,"score_spread":0.19019956391871817,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210503480","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011755273,0.00013235537,0.95802665,0.00005946638,0.00008174749,0.00011847524,0.0007053338,0.019702729,0.009417922],"genre_scores_gemma":[0.16385241,0.00021878484,0.8167492,0.00007420779,0.000019222838,0.0004610401,0.003937994,0.0058088377,0.008878389],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99843055,0.0002790533,0.00009186365,0.00018596332,0.0009197195,0.000092840375],"domain_scores_gemma":[0.99668103,0.0012184466,0.00014804416,0.0010094556,0.0008624127,0.00008047831],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016072844,0.001151908,0.0007836217,0.0015361506,0.0005700608,0.002536795,0.0037345898,0.0013259692,0.024258342],"category_scores_gemma":[0.007292604,0.0014614571,0.0006760622,0.0010607106,0.00060419086,0.0023834975,0.001888725,0.0011957302,0.008897593],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005910541,0.0002900119,0.001757037,0.00088306575,0.00006942704,0.00054576836,0.0010881708,0.11458396,0.09385202,0.039272472,0.036759827,0.7103071],"study_design_scores_gemma":[0.00008746455,0.00019001897,0.0012853483,0.00015952734,0.00003634317,0.00060840114,0.00029404397,0.7679981,0.13884437,0.01159655,0.078799576,0.00010035034],"about_ca_topic_score_codex":0.0015184719,"about_ca_topic_score_gemma":0.0018483564,"teacher_disagreement_score":0.024258342,"about_ca_system_score_codex":0.00074054126,"about_ca_system_score_gemma":0.00059633906,"threshold_uncertainty_score":0.08115226},"labels":[],"label_agreement":null},{"id":"W4210517762","doi":"10.1109/wsc.2001.977484","title":"On the use of fuzzy clustering in construction simulation","year":2002,"lang":"en","type":"article","venue":"Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Cluster analysis; Computer science; Fuzzy clustering; Fuzzy logic; Discrete event simulation; Data mining; Fuzzy set; Object (grammar); Simulation; Artificial intelligence","score_opus":0.09102927008037776,"score_gpt":0.251150373096839,"score_spread":0.16012110301646126,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210517762","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0151801,0.00016502813,0.9803656,0.00011242603,0.00001819654,0.00004645648,0.000021687152,0.00015156114,0.003938937],"genre_scores_gemma":[0.5736296,0.00043364937,0.42439204,0.00006415847,0.00002767391,0.00014320503,0.00006896853,0.000074292235,0.0011664738],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983032,0.0009951766,0.000072409755,0.00016031181,0.00039787628,0.00007114926],"domain_scores_gemma":[0.99521565,0.0034488866,0.00022471887,0.00035403934,0.00066138554,0.000095274365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035028793,0.0007056614,0.00091229426,0.0014364319,0.0010657187,0.0013442342,0.0011694924,0.0010384545,0.001488206],"category_scores_gemma":[0.01057937,0.00054621376,0.0009051852,0.0015264663,0.0013092646,0.0012975496,0.0010490862,0.00078126596,0.0002619432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029419078,0.000019035204,0.000479909,0.000026781086,0.000032701722,0.000030300707,0.00008053847,0.9442043,0.000499629,0.03280676,0.00013685365,0.021653788],"study_design_scores_gemma":[0.0000053328936,0.000015756947,0.00012104918,0.000010982209,0.0000060893626,0.0000145494505,0.00001565323,0.98489213,0.00039397556,0.013888263,0.000625848,0.000010348541],"about_ca_topic_score_codex":0.017838594,"about_ca_topic_score_gemma":0.010650255,"teacher_disagreement_score":0.017838594,"about_ca_system_score_codex":0.0016867764,"about_ca_system_score_gemma":0.0013395337,"threshold_uncertainty_score":0.035469532},"labels":[],"label_agreement":null},{"id":"W4210537281","doi":"10.1007/s12205-022-0708-y","title":"Dynamic Multi-objective Construction Site Layout Planning Based on BIM","year":2022,"lang":"en","type":"article","venue":"KSCE Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Plan (archaeology); Building information modeling; Particle swarm optimization; Quality (philosophy); Order (exchange); Transport engineering; Engineering; Construction management; Computer science; Construction engineering; Operations research; Systems engineering; Civil engineering; Operations management; Scheduling (production processes)","score_opus":0.0057563601497910176,"score_gpt":0.20089978128841868,"score_spread":0.19514342113862765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210537281","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04822107,0.0002493784,0.94229907,0.000104693034,0.00003639884,0.00012730726,0.00022896368,0.0005966854,0.008136534],"genre_scores_gemma":[0.77400386,0.0002657241,0.22131278,0.000046024867,0.000016390293,0.00035481597,0.0004688534,0.00012640501,0.00340517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993942,0.00013102654,0.000022035494,0.000111194415,0.00022931531,0.00011219581],"domain_scores_gemma":[0.99968505,0.00012478101,0.00004371625,0.000029392277,0.00007502718,0.00004197108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00075652974,0.0012584692,0.0018852046,0.0016610491,0.0006747562,0.0014479492,0.001356803,0.00088446855,0.0025332433],"category_scores_gemma":[0.00089580845,0.0012329186,0.001312857,0.0020636842,0.0005185493,0.0012738239,0.001644798,0.00066625705,0.00043225574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001991931,0.000030240799,0.00027386268,0.000027779695,0.000016877653,0.000036044446,0.000019635901,0.982927,0.00088466663,0.0012983163,0.00022527523,0.014240339],"study_design_scores_gemma":[0.0000028706322,0.000013557418,0.00012578114,0.0000025956517,0.0000058341707,0.000007290231,0.000011508983,0.9988815,0.00017705974,0.00060613675,0.00016190777,0.0000039150027],"about_ca_topic_score_codex":0.014591077,"about_ca_topic_score_gemma":0.017452065,"teacher_disagreement_score":0.014591077,"about_ca_system_score_codex":0.0011241036,"about_ca_system_score_gemma":0.0018250262,"threshold_uncertainty_score":0.029012263},"labels":[],"label_agreement":null},{"id":"W4210645327","doi":"10.1088/1757-899x/1218/1/012023","title":"Assessment of existing BIM implementation processes of a public organization to improve building assets management and maintenance","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Asset (computer security); Asset management; Process management; Control (management); Quality (philosophy); Computer science; Engineering management; Knowledge management; Risk analysis (engineering); Construction engineering; Business; Engineering; Operations management; Computer security","score_opus":0.01762772329096488,"score_gpt":0.2570089446521149,"score_spread":0.23938122136115,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210645327","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97745425,0.00013966562,0.006585692,0.00075548835,0.0000149572425,0.00031091343,0.0001326669,0.00021303452,0.014393373],"genre_scores_gemma":[0.9883535,0.00011701601,0.00935135,0.000035341924,0.000006185414,0.00011356885,0.0002015118,0.000035678884,0.0017858568],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98816586,0.0059658363,0.0006433386,0.00062763935,0.0031583342,0.0014391033],"domain_scores_gemma":[0.970144,0.008134173,0.004714744,0.004012498,0.010542508,0.0024520634],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02221628,0.00031641367,0.00032652885,0.0035088914,0.002231628,0.0051666596,0.0014323539,0.0010700597,0.00345777],"category_scores_gemma":[0.026817301,0.00044775187,0.00038521603,0.003543239,0.001119327,0.0037857415,0.0027843255,0.00076510746,0.0007695738],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010299302,0.0056810468,0.28176573,0.0007192616,0.0001227936,0.00069655076,0.034872074,0.02042416,0.007902245,0.017018236,0.0050363527,0.6247317],"study_design_scores_gemma":[0.00014712804,0.0040864823,0.7006009,0.0009067239,0.00023870921,0.00045930114,0.13118522,0.07678158,0.01149559,0.004448419,0.06946952,0.00018037336],"about_ca_topic_score_codex":0.006971249,"about_ca_topic_score_gemma":0.010307975,"teacher_disagreement_score":0.02221628,"about_ca_system_score_codex":0.006027837,"about_ca_system_score_gemma":0.007984927,"threshold_uncertainty_score":0.11749232},"labels":[],"label_agreement":null},{"id":"W4210789919","doi":"10.5703/1288284315866","title":"Stroboscope","year":2007,"lang":"ca","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Purdue Pharma (Canada)","funders":"","keywords":"Acronym; Stroboscope; Computer science; State (computer science); Programming language; Engineering drawing; Engineering; Electrical engineering; Linguistics","score_opus":0.02192975702297884,"score_gpt":0.26653771908640755,"score_spread":0.24460796206342872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4210789919","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012214881,0.0020259905,0.3188347,0.0013724248,0.001517247,0.0006581265,0.009776633,0.04106829,0.61253184],"genre_scores_gemma":[0.24215813,0.005755906,0.30775034,0.0012843083,0.00043484833,0.0017372341,0.0336231,0.022971015,0.38428506],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99853086,0.00024393167,0.00005575891,0.00017854682,0.0008097302,0.00018114087],"domain_scores_gemma":[0.9985846,0.00031268338,0.0000747555,0.00040087014,0.00047451397,0.00015254137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010206685,0.0010278613,0.0009974944,0.0014792589,0.0011166576,0.002586718,0.0015715611,0.0010836187,0.119271666],"category_scores_gemma":[0.0034598163,0.00065486325,0.00084341236,0.0017489592,0.00067174534,0.0024491886,0.0029633853,0.0017020304,0.04091958],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006152729,0.00016064066,0.0019253675,0.0006498447,0.0000766707,0.0004455745,0.00040423474,0.024857836,0.01748052,0.18337874,0.47366506,0.2963403],"study_design_scores_gemma":[0.00012827016,0.00008916642,0.0006059131,0.0001387013,0.000032884338,0.00036367768,0.00006601749,0.03414062,0.015968459,0.020544775,0.9278715,0.000049919185],"about_ca_topic_score_codex":0.0037036915,"about_ca_topic_score_gemma":0.0037442644,"teacher_disagreement_score":0.119271666,"about_ca_system_score_codex":0.0010634997,"about_ca_system_score_gemma":0.0028438966,"threshold_uncertainty_score":0.39900345},"labels":[],"label_agreement":null},{"id":"W4212893074","doi":"10.1109/wsc.2012.6465165","title":"Simulation of mobile crane operations in 3D space","year":2012,"lang":"en","type":"article","venue":"Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Lift (data mining); Schedule; Process (computing); Computer science; Industrial engineering; Engineering; Simulation; Operations research; Artificial intelligence; Data mining","score_opus":0.01754669030034026,"score_gpt":0.24892054442089367,"score_spread":0.23137385412055342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4212893074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6044874,0.00013942728,0.36566824,0.0003521118,0.00009344499,0.0003595051,0.0017890207,0.0018472075,0.025263604],"genre_scores_gemma":[0.9414151,0.00017883649,0.053570334,0.000029622648,0.000008325021,0.00029467978,0.00063032325,0.00007276161,0.0038000545],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998248,0.000048391812,0.000010630473,0.000021011416,0.00006729682,0.000027904975],"domain_scores_gemma":[0.9996387,0.00019627859,0.000026591732,0.000039120652,0.000058222933,0.00004106575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026495103,0.0005290131,0.0003799447,0.00044658987,0.0004916506,0.0009275816,0.00072580006,0.0008925446,0.004814032],"category_scores_gemma":[0.00077631517,0.00032614087,0.00067324215,0.00046347157,0.00052689476,0.00046887435,0.0009464807,0.0004039975,0.00043004373],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007623609,0.00003728509,0.001347556,0.00003524669,0.000010065635,0.00009835752,0.00015204202,0.99009925,0.0022172218,0.0014264893,0.00026433755,0.0042359],"study_design_scores_gemma":[0.000026707665,0.00004463518,0.00053279183,0.0000069982557,0.0000043593573,0.00002220237,0.00008180062,0.9967206,0.0009605178,0.00046363918,0.0011251959,0.000010505737],"about_ca_topic_score_codex":0.017863221,"about_ca_topic_score_gemma":0.016314136,"teacher_disagreement_score":0.017863221,"about_ca_system_score_codex":0.0004244361,"about_ca_system_score_gemma":0.0009984367,"threshold_uncertainty_score":0.035518467},"labels":[],"label_agreement":null},{"id":"W4212900071","doi":"10.1177/14780771211069999","title":"The use of reinforced learning to support multidisciplinary design in the AEC industry: Assessing the utilization of Markov Decision Process","year":2022,"lang":"en","type":"article","venue":"International Journal of Architectural Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Multidisciplinary approach; Markov decision process; Process (computing); Engineering design process; Engineering; Risk analysis (engineering); Systems engineering; Decision support system; Management science; Architecture; Computer science; Engineering management; Artificial intelligence; Markov process; Business; Mechanical engineering","score_opus":0.04876883625864213,"score_gpt":0.3259206915831386,"score_spread":0.27715185532449643,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4212900071","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5468705,0.00053070934,0.44288757,0.0010493565,0.00004285175,0.00035199054,0.00017745135,0.00056309544,0.007526443],"genre_scores_gemma":[0.9265607,0.00018657389,0.07249037,0.00005918676,0.000007454597,0.00012955074,0.00008519464,0.000019256384,0.00046177921],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99762005,0.0014418988,0.00011869975,0.0002604852,0.00041373266,0.00014514037],"domain_scores_gemma":[0.9627943,0.031789146,0.0020553805,0.0011128986,0.0016411021,0.00060719455],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005741284,0.00084660965,0.00066780817,0.0013540838,0.00057683437,0.002048672,0.0012793673,0.0013564954,0.0015623106],"category_scores_gemma":[0.030039646,0.00042082748,0.0006997735,0.00083736685,0.0009399712,0.0025813757,0.00175728,0.0019095642,0.00023114916],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035415433,0.00045797043,0.013846317,0.00016324651,0.000085572625,0.00007970087,0.00037288593,0.91012937,0.0009231026,0.006767461,0.00026876558,0.0665514],"study_design_scores_gemma":[0.000016456703,0.00019962002,0.0008187672,0.000025463447,0.000015934205,0.000013006002,0.00006225775,0.99299663,0.0006638513,0.004891911,0.00028372943,0.0000124330045],"about_ca_topic_score_codex":0.009678046,"about_ca_topic_score_gemma":0.009772652,"teacher_disagreement_score":0.009678046,"about_ca_system_score_codex":0.002161819,"about_ca_system_score_gemma":0.0024728442,"threshold_uncertainty_score":0.030363142},"labels":[],"label_agreement":null},{"id":"W4213250542","doi":"10.1007/s13296-022-00585-3","title":"Achieving Improved Construction Efficiency for Multi-Story Steel Concentrically Braced Frames","year":2022,"lang":"en","type":"article","venue":"International Journal of Steel Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Structural engineering; Braced frame; Finite element method; Engineering; Seismic loading; Seismic analysis; Structural load; Wind engineering; Frame (networking); Mechanical engineering","score_opus":0.012075508252872232,"score_gpt":0.25266804073832677,"score_spread":0.24059253248545454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213250542","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5922373,0.0002042697,0.39461353,0.000054754964,0.000031561078,0.000039235758,0.00009961674,0.0007715986,0.011948088],"genre_scores_gemma":[0.91038144,0.00005751809,0.08652268,0.0000124599355,0.000003702788,0.000016319062,0.00011936327,0.0000932077,0.0027932634],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99959785,0.00004736558,0.000013442112,0.00006511892,0.00017467242,0.00010154678],"domain_scores_gemma":[0.9996555,0.000056131597,0.000053155025,0.00008644228,0.00012568859,0.000023043545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003922152,0.00070480385,0.00050023576,0.0005458476,0.00029814488,0.0005839404,0.0011712349,0.0004449191,0.0032091895],"category_scores_gemma":[0.0006492733,0.00030609305,0.00028436308,0.0005280758,0.00024349272,0.00062178826,0.00076237344,0.00031178122,0.001032231],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000684014,0.00038999246,0.002839398,0.00020176357,0.000056448007,0.00027362193,0.00024713823,0.17842817,0.5929958,0.012843342,0.0018488055,0.2091915],"study_design_scores_gemma":[0.00004983296,0.0006478033,0.0058896313,0.000030025862,0.000057575227,0.00035822802,0.00018868616,0.65623754,0.3262924,0.0026203387,0.0075902324,0.00003775163],"about_ca_topic_score_codex":0.0009777714,"about_ca_topic_score_gemma":0.0032070195,"teacher_disagreement_score":0.0032091895,"about_ca_system_score_codex":0.00037212615,"about_ca_system_score_gemma":0.00045450887,"threshold_uncertainty_score":0.010735869},"labels":[],"label_agreement":null},{"id":"W4213423733","doi":"10.1016/j.jobe.2022.104254","title":"Parametric-based design optimization of air distribution system in panelized construction","year":2022,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"HVAC; Parametric statistics; Air conditioning; Context (archaeology); Engineering; Atmospheric duct; Automotive engineering; Systems design; Parametric design; Reliability engineering; Computer science; Simulation; Systems engineering; Mechanical engineering","score_opus":0.008494862316628405,"score_gpt":0.18892052254252312,"score_spread":0.1804256602258947,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4213423733","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21930492,0.00047196,0.7478718,0.00028944932,0.00007462836,0.00013170218,0.00022377461,0.00041901562,0.031212738],"genre_scores_gemma":[0.97429216,0.000097581324,0.02266835,0.0000243139,0.000010233717,0.00008134585,0.00007132697,0.000071034454,0.0026836554],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996954,0.00012687991,0.00000741534,0.000037775822,0.000078519675,0.00005402902],"domain_scores_gemma":[0.99966204,0.0001825759,0.00003129069,0.000023873426,0.00008026444,0.000019798448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071523414,0.0006465979,0.0013629638,0.0006421483,0.00067235704,0.0011975848,0.00087192754,0.0012370993,0.0046436745],"category_scores_gemma":[0.0011836935,0.0008253562,0.00082199345,0.0006238052,0.0005712596,0.0007058299,0.0007847927,0.0006684137,0.00043179345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017695595,0.000013926874,0.00010406926,0.000013054011,0.00000482412,0.000012448292,0.000008689115,0.9968304,0.00045236974,0.00044896072,0.00007705302,0.002016413],"study_design_scores_gemma":[0.0000033958943,0.000014350745,0.0000678927,0.0000015418868,0.0000030164447,0.0000030226188,0.000008056888,0.99948126,0.00015339156,0.00014133708,0.00012091519,0.0000017714813],"about_ca_topic_score_codex":0.006723636,"about_ca_topic_score_gemma":0.006668423,"teacher_disagreement_score":0.006723636,"about_ca_system_score_codex":0.000848183,"about_ca_system_score_gemma":0.0012024941,"threshold_uncertainty_score":0.015534639},"labels":[],"label_agreement":null},{"id":"W4220659750","doi":"10.3390/buildings12030354","title":"Towards Automated Construction Quantity Take-Off: An Integrated Approach to Information Extraction from Work Descriptions","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer science; Hidden Markov model; Conditional random field; Information extraction; Artificial intelligence; Process (computing); Machine learning; Natural language processing; Named-entity recognition; Field (mathematics); Engineering","score_opus":0.015444921178924256,"score_gpt":0.2254504924078148,"score_spread":0.21000557122889055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220659750","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00783155,0.000476029,0.9788319,0.0002454239,0.000061912375,0.00037397988,0.002953808,0.0065650255,0.0026603814],"genre_scores_gemma":[0.05242142,0.0006923743,0.9321684,0.00010235082,0.000038204846,0.00043572029,0.01126357,0.00040255135,0.0024754733],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99738497,0.00052956387,0.00034544631,0.00074397057,0.00084147806,0.00015469734],"domain_scores_gemma":[0.9963536,0.001304357,0.0003707067,0.00062572,0.0012611044,0.0000844366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019667428,0.002080432,0.0011556427,0.007652914,0.0007513851,0.002145689,0.0020666982,0.0012811664,0.0031323854],"category_scores_gemma":[0.0067464146,0.00093415985,0.0021688784,0.0050539477,0.0005912035,0.005064439,0.0026619849,0.0017617246,0.004033154],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015121927,0.00025304424,0.0035557556,0.0011765374,0.00010196395,0.0006538682,0.00094238215,0.014255232,0.020864993,0.008790572,0.014654181,0.9346003],"study_design_scores_gemma":[0.00007777822,0.0002857175,0.016241362,0.00071928743,0.00040514203,0.0011929395,0.0027677035,0.7267727,0.08543365,0.045399763,0.120399214,0.0003047107],"about_ca_topic_score_codex":0.007889371,"about_ca_topic_score_gemma":0.008318874,"teacher_disagreement_score":0.007889371,"about_ca_system_score_codex":0.0011190436,"about_ca_system_score_gemma":0.002898463,"threshold_uncertainty_score":0.01568687},"labels":[],"label_agreement":null},{"id":"W4220678549","doi":"10.1061/9780784483978.068","title":"A Framework for Estimating the Reuse Value of In Situ Building Materials","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reuse; Demolition; Deconstruction (building); Raw material; Circular economy; Natural resource; Consumption (sociology); Environmental economics; Population; Production (economics); Work (physics); Building material; Sustainability; Business; Civil engineering; Engineering; Waste management; Mechanical engineering; Economics","score_opus":0.03695221047992209,"score_gpt":0.34200908174528605,"score_spread":0.30505687126536396,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220678549","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021869553,0.0003944015,0.9676857,0.00016111557,0.000029363666,0.00013023669,0.00042586873,0.00020260658,0.009101139],"genre_scores_gemma":[0.4721706,0.0008614096,0.52147907,0.00006359179,0.000044971533,0.0004973319,0.0007329121,0.00010967115,0.004040383],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99688005,0.0011823297,0.00016799655,0.00043702545,0.0010925444,0.00023999604],"domain_scores_gemma":[0.99681747,0.0018039221,0.0005314498,0.000245467,0.0005296554,0.00007207968],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047250604,0.0013856344,0.0007672548,0.006163469,0.0005649175,0.003797754,0.0027174654,0.0022278267,0.0032880534],"category_scores_gemma":[0.009598367,0.0006187683,0.0015854691,0.0034976003,0.0014088341,0.0034054937,0.0022212807,0.0013414634,0.0006890607],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055551853,0.00028365143,0.01115526,0.0002508927,0.0001388801,0.00031770693,0.00033865735,0.66043687,0.005382214,0.24625452,0.0016360697,0.07374972],"study_design_scores_gemma":[0.000007053211,0.00009772454,0.003601559,0.00008505927,0.000038743157,0.00018667009,0.00021155055,0.93568075,0.0018661928,0.053035654,0.0051308805,0.00005820665],"about_ca_topic_score_codex":0.01314663,"about_ca_topic_score_gemma":0.009112694,"teacher_disagreement_score":0.01314663,"about_ca_system_score_codex":0.002352522,"about_ca_system_score_gemma":0.0018031665,"threshold_uncertainty_score":0.026140213},"labels":[],"label_agreement":null},{"id":"W4220683549","doi":"10.1061/9780784483961.068","title":"A Framework to Enhance Utilization of Automated Progress Measurements in Construction Projects","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Baseline (sea); Automation; Process (computing); Computer science; Work (physics); Systems engineering; Measure (data warehouse); Engineering; Data mining","score_opus":0.07787637593503761,"score_gpt":0.3790247827063963,"score_spread":0.3011484067713587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220683549","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023194763,0.000092870374,0.9922025,0.00025437734,0.000018284678,0.00037040867,0.00009478348,0.0014711936,0.0031760815],"genre_scores_gemma":[0.029196655,0.00012833625,0.96928746,0.000037745973,0.000011203527,0.00039429404,0.0002933676,0.00009427251,0.0005566029],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9868794,0.0061635473,0.0017350235,0.0018581148,0.0026399293,0.00072399207],"domain_scores_gemma":[0.988896,0.004732597,0.0013838302,0.0019929872,0.00246131,0.0005332524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020446071,0.0019314307,0.000937729,0.007346946,0.0017178614,0.0059690336,0.0038183515,0.0024198475,0.0023760037],"category_scores_gemma":[0.020983398,0.0014539002,0.002396048,0.004416931,0.0032729045,0.009829874,0.0060129105,0.0022007758,0.0012160074],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012238289,0.000501064,0.0072476864,0.0011859365,0.00012527125,0.0011708273,0.009132911,0.062206786,0.00840924,0.60452694,0.006906139,0.2984648],"study_design_scores_gemma":[0.000115567556,0.0004653137,0.005455447,0.002332994,0.00028849393,0.0019363607,0.0038191963,0.49896395,0.014724535,0.21186872,0.25964877,0.00038074152],"about_ca_topic_score_codex":0.010737792,"about_ca_topic_score_gemma":0.011884907,"teacher_disagreement_score":0.020446071,"about_ca_system_score_codex":0.0026576852,"about_ca_system_score_gemma":0.006621227,"threshold_uncertainty_score":0.108130455},"labels":[],"label_agreement":null},{"id":"W4220695606","doi":"10.36680/j.itcon.2022.013","title":"Evaluating the use of virtual reality for maintainability-focused design reviews","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Maintainability; Usability; Virtual reality; Engineering; Human–computer interaction; Computer science; Systems engineering; Reliability engineering; Software engineering","score_opus":0.07157249765784443,"score_gpt":0.3037117611674438,"score_spread":0.23213926350959938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220695606","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9863229,0.0010378608,0.007358556,0.00014975648,0.000031175325,0.001754887,0.000085938314,0.00008733211,0.0031715983],"genre_scores_gemma":[0.93707275,0.0013579467,0.057394844,0.00010467587,0.000033030676,0.0029865855,0.00017102239,0.000043470332,0.00083564623],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.8952849,0.08157556,0.007705591,0.0023083466,0.011879665,0.0012458423],"domain_scores_gemma":[0.55568,0.3653779,0.029285569,0.009279305,0.03740209,0.002975238],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06451371,0.00092802313,0.0011005208,0.0034388897,0.00089601637,0.0026946587,0.0018081856,0.001082689,0.0015529245],"category_scores_gemma":[0.23618694,0.0008540175,0.0010903002,0.0019391112,0.00091946695,0.0022226444,0.0023285632,0.00077074475,0.00041069093],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005165005,0.007943581,0.1152775,0.017912043,0.0008885734,0.0010816222,0.16125442,0.009046083,0.036066696,0.0014496775,0.0022573643,0.6416574],"study_design_scores_gemma":[0.0033354845,0.10839898,0.6304974,0.01028423,0.0033069453,0.0020113965,0.118380204,0.028755657,0.046838176,0.0017830116,0.0453144,0.0010940274],"about_ca_topic_score_codex":0.0013878214,"about_ca_topic_score_gemma":0.0036313187,"teacher_disagreement_score":0.06451371,"about_ca_system_score_codex":0.0028370696,"about_ca_system_score_gemma":0.0027023738,"threshold_uncertainty_score":0.3411852},"labels":[],"label_agreement":null},{"id":"W4220841884","doi":"10.1016/j.jclepro.2022.131290","title":"Economic sustainability benchmarking of modular homes: A life cycle thinking approach","year":2022,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Benchmarking; Sustainability; Benchmark (surveying); Modular design; Performance indicator; Environmental economics; Set (abstract data type); Computer science; Engineering; Process management; Business; Economics; Marketing","score_opus":0.005503446186944524,"score_gpt":0.19740071570632686,"score_spread":0.19189726951938235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220841884","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42768922,0.00097018736,0.44109482,0.0019503605,0.00013327811,0.0005328146,0.0010697433,0.0002910456,0.12626855],"genre_scores_gemma":[0.9718203,0.0001722373,0.026177166,0.000033856624,0.000012554626,0.00011405218,0.00028912784,0.000044395594,0.0013362832],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9941088,0.0035273463,0.00015393429,0.0002915034,0.0015118363,0.0004066631],"domain_scores_gemma":[0.99414176,0.0029427295,0.00043969502,0.0005503917,0.0017840898,0.0001414083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009605845,0.00079333736,0.001154175,0.0039472696,0.0005704516,0.003649961,0.0019416072,0.0010924923,0.0037866663],"category_scores_gemma":[0.018631946,0.00041031544,0.0010072946,0.004698675,0.0009840778,0.0041146106,0.0014497753,0.0009037352,0.00020417996],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014192186,0.00027064857,0.0080194995,0.00017231358,0.00012970569,0.00008607363,0.00017418839,0.6859014,0.00092909724,0.21933213,0.0016380105,0.08320507],"study_design_scores_gemma":[0.00001750728,0.00023408917,0.005828711,0.00011749771,0.00004842719,0.00003098519,0.00055171474,0.8917674,0.0017499379,0.09602626,0.0035844226,0.00004300735],"about_ca_topic_score_codex":0.00548765,"about_ca_topic_score_gemma":0.007347791,"teacher_disagreement_score":0.009605845,"about_ca_system_score_codex":0.005087796,"about_ca_system_score_gemma":0.0030758888,"threshold_uncertainty_score":0.050801158},"labels":[],"label_agreement":null},{"id":"W4220876383","doi":"10.1061/9780784483978.031","title":"Machine Learning Framework to Predict Last Planner System Performance Metrics","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Computer science; Machine learning; Control (management); Artificial intelligence; Lean construction; Industrial engineering; Construction industry; Engineering; Construction engineering","score_opus":0.020761813411311954,"score_gpt":0.2685951538534851,"score_spread":0.24783334044217314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220876383","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015359718,0.00038315268,0.97970015,0.00045775843,0.000050291637,0.00008904825,0.00023600289,0.0008225449,0.002901218],"genre_scores_gemma":[0.8125364,0.00068239786,0.17923866,0.00016184336,0.00013497048,0.0005734213,0.0008009188,0.00009253006,0.0057789204],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991856,0.0002483821,0.000049068793,0.00016982133,0.0002284978,0.00011859534],"domain_scores_gemma":[0.9985032,0.0008399154,0.00019197867,0.000053157793,0.00036413543,0.000047622172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019469163,0.0012113762,0.0010884051,0.001389231,0.00043524784,0.0013623474,0.0013872762,0.0011882087,0.0023734334],"category_scores_gemma":[0.0034201383,0.00044057454,0.00072752294,0.0009865904,0.0005880626,0.0010355045,0.0006335504,0.00157402,0.00060239376],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016219527,0.00003422699,0.00048034402,0.00001774466,0.00001693446,0.000018916959,0.000011336021,0.98332584,0.00022611237,0.0031729566,0.00040172215,0.0122778],"study_design_scores_gemma":[0.0000012580971,0.0000075715966,0.00006243382,0.000002346672,0.000002483809,0.0000025023064,0.0000015294017,0.9988341,0.00006683896,0.0009026647,0.00011421246,0.0000020591817],"about_ca_topic_score_codex":0.019763997,"about_ca_topic_score_gemma":0.011925901,"teacher_disagreement_score":0.019763997,"about_ca_system_score_codex":0.0016678285,"about_ca_system_score_gemma":0.0023099058,"threshold_uncertainty_score":0.03929794},"labels":[],"label_agreement":null},{"id":"W4220891812","doi":"10.1016/j.autcon.2022.104201","title":"Integrating off-site and on-site panelized construction schedules using fleet dispatching","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea","keywords":"Schedule; Factory (object-oriented programming); Truck; Bridge (graph theory); Discrete event simulation; Engineering; Transport engineering; Operations research; Fleet management; Computer science; Operations management; Simulation; Automotive engineering","score_opus":0.010102974649408082,"score_gpt":0.2246264265965721,"score_spread":0.21452345194716402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220891812","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16042401,0.00007965227,0.80116624,0.00010184989,0.0002041032,0.00024450655,0.0006671534,0.006196434,0.030916061],"genre_scores_gemma":[0.7512515,0.00009224754,0.23648748,0.000026270896,0.000025770387,0.00008880823,0.0011743426,0.000992891,0.009860634],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990766,0.00021632553,0.000040507013,0.00015191383,0.00039307182,0.00012164227],"domain_scores_gemma":[0.9987992,0.00026945927,0.000111032765,0.00035068468,0.0003553704,0.00011419246],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011575641,0.00088492705,0.0007873598,0.0014002796,0.0004711539,0.0016402754,0.0010203535,0.00039960374,0.010298274],"category_scores_gemma":[0.0025402918,0.000553731,0.00058412243,0.0012499004,0.00026872024,0.0013196901,0.0011569081,0.00077156635,0.002382899],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050906744,0.00043282597,0.005786341,0.00012685178,0.000084911226,0.00016695929,0.0004822013,0.5432309,0.029408623,0.0065177158,0.004885405,0.40836823],"study_design_scores_gemma":[0.00004450326,0.0002676582,0.009040124,0.000046810077,0.00006101844,0.00010244621,0.00039772745,0.9476047,0.020598926,0.0054112887,0.016324993,0.00009977896],"about_ca_topic_score_codex":0.009488925,"about_ca_topic_score_gemma":0.013180464,"teacher_disagreement_score":0.010298274,"about_ca_system_score_codex":0.0007657475,"about_ca_system_score_gemma":0.0016146655,"threshold_uncertainty_score":0.034451187},"labels":[],"label_agreement":null},{"id":"W4220900789","doi":"10.1061/9780784483978.039","title":"Integrated DEMATEL and ANP-Based Framework to Model Construction Labor Productivity","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Process (computing); Computer science; Analytic network process; Subjectivity; Quality (philosophy); Decision support system; Risk analysis (engineering); Management science; Knowledge management; Industrial engineering; Operations research; Engineering; Artificial intelligence; Business; Economics","score_opus":0.028657043361318663,"score_gpt":0.297533011739239,"score_spread":0.2688759683779204,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220900789","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006937344,0.00006396135,0.9856425,0.0001461859,0.000016853573,0.0001229758,0.00025669814,0.00032582562,0.0064877216],"genre_scores_gemma":[0.3242573,0.0003290003,0.66836244,0.00007105079,0.000029191095,0.0011742425,0.0006499162,0.00010691792,0.0050199674],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991671,0.00036770603,0.000049122005,0.00010924853,0.00023916592,0.00006776218],"domain_scores_gemma":[0.99905235,0.0005452172,0.00008967444,0.000058744576,0.00021777439,0.000036202982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021195547,0.0008836308,0.0005483373,0.0019818095,0.0006854211,0.0016535548,0.0014659426,0.00091557926,0.0048376303],"category_scores_gemma":[0.003314309,0.00043953676,0.00093030237,0.0018547208,0.00064833986,0.0013108305,0.0014971287,0.0010677471,0.0005726751],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014245202,0.00004882494,0.00075576484,0.00004519942,0.000017696768,0.000051246134,0.00006514715,0.9505815,0.0004254262,0.032274824,0.0004986833,0.015221452],"study_design_scores_gemma":[0.0000030001163,0.000006271358,0.000073218675,0.000005757441,0.0000035774583,0.0000063839957,0.000018508923,0.9931584,0.00012417983,0.0055778646,0.0010193326,0.0000034540776],"about_ca_topic_score_codex":0.018946497,"about_ca_topic_score_gemma":0.02074992,"teacher_disagreement_score":0.018946497,"about_ca_system_score_codex":0.0022883595,"about_ca_system_score_gemma":0.0025639555,"threshold_uncertainty_score":0.03767246},"labels":[],"label_agreement":null},{"id":"W4220955353","doi":"10.1080/23744731.2022.2052668","title":"A methodology to integrate maintenance management systems and BIM to improve building management","year":2022,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":24,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Workflow; Interoperability; Facility management; Computer science; Context (archaeology); Process (computing); Building information modeling; Data management; Process management; Systems engineering; Engineering; Database; Scheduling (production processes); Operations management","score_opus":0.0140295200681891,"score_gpt":0.2316001002445175,"score_spread":0.21757058017632838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220955353","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017591488,0.000051161303,0.9946694,0.00020641123,0.000026506315,0.0003503854,0.00011420656,0.0006039493,0.0022188495],"genre_scores_gemma":[0.011956167,0.00004953756,0.98704183,0.000028044858,0.0000058017076,0.00020487761,0.00018824344,0.00003227143,0.0004931529],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9952301,0.0015930407,0.0006134414,0.0006817968,0.0016471163,0.00023455998],"domain_scores_gemma":[0.99491066,0.0014282797,0.0006686278,0.0010444153,0.0017300001,0.0002178982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007392758,0.0011659197,0.00050331565,0.0057967114,0.0011527175,0.0044115186,0.0021632912,0.0011299923,0.0027423666],"category_scores_gemma":[0.009169047,0.000987028,0.0015576304,0.0041484395,0.0012586981,0.0031997126,0.00323258,0.00134711,0.0010950279],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000704989,0.0007421667,0.0070396247,0.0010922182,0.0002758712,0.0011094621,0.0034358245,0.05298137,0.021231204,0.25638717,0.008828459,0.6468061],"study_design_scores_gemma":[0.00010162627,0.0007092942,0.0067098774,0.001219556,0.0003509776,0.0027428707,0.0037958056,0.48629126,0.0427414,0.1666043,0.28843802,0.0002949837],"about_ca_topic_score_codex":0.0027943898,"about_ca_topic_score_gemma":0.0044526113,"teacher_disagreement_score":0.007392758,"about_ca_system_score_codex":0.0013201282,"about_ca_system_score_gemma":0.004654613,"threshold_uncertainty_score":0.03909713},"labels":[],"label_agreement":null},{"id":"W4220957888","doi":"10.1111/cgf.14275","title":"Issue Information","year":2022,"lang":"en","type":"paratext","venue":"Computer Graphics Forum","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University; University of Toronto; Simon Fraser University","funders":"","keywords":"Computer science; Citation; Graphics; Information retrieval; World Wide Web; Computer graphics (images)","score_opus":0.0055985584128917226,"score_gpt":0.19670507342689056,"score_spread":0.19110651501399883,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220957888","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00042714595,0.0004796201,0.0017429414,0.005789716,0.010088001,0.0011118662,0.06928514,0.0029984422,0.90807706],"genre_scores_gemma":[0.0035683168,0.00078321586,0.0018268335,0.0038345351,0.0017286406,0.00085324806,0.040357392,0.0017406897,0.94530714],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977774,0.0003028719,0.00024527498,0.00030964793,0.0011755831,0.00018929609],"domain_scores_gemma":[0.9889438,0.003054383,0.00043000648,0.0011210502,0.00517933,0.0012715253],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.002592767,0.0010397745,0.0010908471,0.005831109,0.002684516,0.0072783376,0.0018696291,0.0037367672,0.859621],"category_scores_gemma":[0.01754304,0.0005614913,0.0006830286,0.005357159,0.00057296833,0.004989596,0.0031644655,0.0023170102,0.6832522],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014300846,0.0000169079,0.000060769464,0.00017112681,8.356917e-7,0.00002817657,0.000046392706,0.000016336533,0.000061516235,0.0015316136,0.9799053,0.018146772],"study_design_scores_gemma":[0.000005681653,0.000005632548,0.0001169979,0.00007906356,8.3323283e-7,0.00002216793,0.00005422244,0.000024773119,0.00004077201,0.0006150214,0.99903226,0.000002626159],"about_ca_topic_score_codex":0.0024321736,"about_ca_topic_score_gemma":0.003943468,"teacher_disagreement_score":0.14037901,"about_ca_system_score_codex":0.0013568423,"about_ca_system_score_gemma":0.0030048387,"threshold_uncertainty_score":0.20023364},"labels":[],"label_agreement":null},{"id":"W4220981506","doi":"10.1061/9780784483961.092","title":"Framework for Simulating Crew Motivation Impact on Productivity—A Hybrid Modeling Approach","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Productivity; Dynamism; Computer science; Fuzzy logic; Track (disk drive); Identification (biology); Industrial engineering; Industrial organization; Business; Engineering; Artificial intelligence; Economics","score_opus":0.0757413966445981,"score_gpt":0.34700515897443446,"score_spread":0.27126376232983634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220981506","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06556737,0.0001673772,0.9172303,0.00030910026,0.000036447054,0.00012815888,0.0003032443,0.0003501653,0.015907833],"genre_scores_gemma":[0.83049023,0.00033010065,0.16368522,0.000066246415,0.000025743188,0.00056545535,0.00024066599,0.00006538683,0.004531024],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996125,0.00015465445,0.000022601786,0.00006452437,0.000091921625,0.000053784417],"domain_scores_gemma":[0.99940336,0.00034467014,0.00007322941,0.000041290026,0.00009810913,0.000039353217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009969216,0.00073787145,0.0005657204,0.0011875468,0.00052253925,0.0014407885,0.0016428314,0.001475837,0.0032363879],"category_scores_gemma":[0.0017988639,0.000445612,0.0011632883,0.000828366,0.00058828515,0.00092583906,0.0012813848,0.0007196067,0.00031405778],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019098285,0.000051594787,0.00091920653,0.00002588109,0.000025633999,0.000039456238,0.00007623724,0.9801174,0.00090886274,0.013153096,0.00011187388,0.0045516198],"study_design_scores_gemma":[0.000005130937,0.000011250839,0.00011108702,0.0000040340765,0.0000054923953,0.0000047863737,0.000019695282,0.9972319,0.0001042448,0.002117892,0.00038000802,0.0000045341985],"about_ca_topic_score_codex":0.01929862,"about_ca_topic_score_gemma":0.008859653,"teacher_disagreement_score":0.01929862,"about_ca_system_score_codex":0.0012222251,"about_ca_system_score_gemma":0.0015671417,"threshold_uncertainty_score":0.038372576},"labels":[],"label_agreement":null},{"id":"W4220989846","doi":"10.1061/9780784483954.003","title":"Transitioning to the Next Era of Modular Construction: Reconfiguration, Reuse, and Building Stock Agility","year":2022,"lang":"en","type":"article","venue":"Construction Research Congress 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular design; Agile software development; Reuse; Control reconfiguration; Architectural engineering; Process (computing); Stock (firearms); Engineering; Asset (computer security); Computer science; Systems engineering; Construction engineering; Process management; Business; Software engineering; Computer security; Mechanical engineering","score_opus":0.03765020142108328,"score_gpt":0.2915060947260926,"score_spread":0.25385589330500935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4220989846","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26066267,0.12991865,0.16854307,0.039950117,0.000627748,0.0001920275,0.00020306272,0.000392116,0.39951065],"genre_scores_gemma":[0.90570647,0.048943546,0.03168301,0.0014258969,0.00025334823,0.000070921626,0.00012168877,0.00009197585,0.011703135],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9981493,0.0004113246,0.00010297394,0.00017372423,0.0008739627,0.0002888207],"domain_scores_gemma":[0.9977452,0.0010580779,0.00042937676,0.00015520047,0.00041856113,0.00019353896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029712233,0.000316117,0.00027718928,0.0025583827,0.0011230727,0.008388069,0.0006893602,0.0012301748,0.0038209357],"category_scores_gemma":[0.00339865,0.000282668,0.00034006964,0.0031306231,0.004607131,0.009539591,0.002942883,0.001841779,0.0005323967],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028549293,0.000046790236,0.0057268934,0.00081563124,0.000019164476,0.0002717116,0.004069886,0.0029486576,0.0013840464,0.7614018,0.0032632407,0.22002356],"study_design_scores_gemma":[0.000006017899,0.00018741463,0.02633172,0.00257011,0.000049952287,0.0016401288,0.022148043,0.0059193503,0.004177772,0.41851166,0.5183657,0.00009213218],"about_ca_topic_score_codex":0.002066301,"about_ca_topic_score_gemma":0.0037295618,"teacher_disagreement_score":0.008388069,"about_ca_system_score_codex":0.0043316563,"about_ca_system_score_gemma":0.0033023956,"threshold_uncertainty_score":0.031428576},"labels":[],"label_agreement":null},{"id":"W4221017932","doi":"10.18280/ria.360113","title":"An Effective Optimization of Time and Cost Estimation for Prefabrication Construction Management Using Artificial Neural Networks","year":2022,"lang":"en","type":"article","venue":"Revue d intelligence artificielle","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Prefabrication; Procurement; Process (computing); Artificial neural network; Cost estimate; Key (lock); Industrial engineering; Engineering; Computer science; Operations research; Construction engineering; Systems engineering; Artificial intelligence; Civil engineering; Business","score_opus":0.01584629501571994,"score_gpt":0.24403591710165037,"score_spread":0.22818962208593044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221017932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08229028,0.00067344913,0.91264254,0.00020077032,0.0000505069,0.000064466,0.00008829181,0.0003386825,0.0036509524],"genre_scores_gemma":[0.9038787,0.0004108139,0.092790835,0.00004590123,0.000024042552,0.00015256827,0.000174838,0.0000343703,0.002487888],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995827,0.00010908925,0.00003176326,0.000092385984,0.000121036486,0.00006290043],"domain_scores_gemma":[0.9995121,0.00028068197,0.00006242665,0.000020377005,0.00011000546,0.000014434283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007803496,0.00090539904,0.00090720557,0.0007314622,0.00037089348,0.0011058336,0.00069021643,0.0011834336,0.0014914953],"category_scores_gemma":[0.0015976067,0.0005061624,0.0006967424,0.00088224857,0.00027200414,0.001019992,0.00053966476,0.00071422063,0.00017704976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037283142,0.000029333221,0.00041177412,0.00002928255,0.000015886384,0.000018883458,0.000011371463,0.9704817,0.00079169875,0.0005750521,0.00017645495,0.027421251],"study_design_scores_gemma":[0.000001467952,0.0000103493885,0.000115796676,0.0000026770501,0.0000036094555,0.0000026312216,0.0000030699175,0.9993463,0.00025078724,0.00018498892,0.00007612063,0.0000021971728],"about_ca_topic_score_codex":0.010093288,"about_ca_topic_score_gemma":0.0075704525,"teacher_disagreement_score":0.010093288,"about_ca_system_score_codex":0.0008590079,"about_ca_system_score_gemma":0.0011680601,"threshold_uncertainty_score":0.020069122},"labels":[],"label_agreement":null},{"id":"W4221072189","doi":"10.3390/buildings12040390","title":"Barriers, Strategies, and Best Practices for BIM Adoption in Quebec Prefabrication Small and Medium-Sized Enterprises (SMEs)","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Best practice; Building information modeling; Stakeholder; Business; Work (physics); Small and medium-sized enterprises; Process management; Knowledge management; Engineering; Operations management; Computer science; Civil engineering; Public relations; Management","score_opus":0.01675846535763414,"score_gpt":0.24400956279689415,"score_spread":0.22725109743926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4221072189","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9618071,0.0030381195,0.0018704804,0.008782936,0.00003368255,0.00020973402,0.0005439334,0.00005737742,0.023656579],"genre_scores_gemma":[0.9938929,0.0015250839,0.001205016,0.00039273995,0.0000023077048,0.000082638035,0.0001613781,0.0000073120536,0.0027306078],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9966286,0.00078319904,0.00022545701,0.00029059369,0.0012747551,0.00079725287],"domain_scores_gemma":[0.98881334,0.004436564,0.00095596426,0.00017388619,0.0047277743,0.0008925101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042936904,0.00025653225,0.0003279546,0.0016794254,0.005906055,0.0029025644,0.0011248067,0.0006159146,0.0028707804],"category_scores_gemma":[0.010611371,0.00021911903,0.00027707408,0.0037517832,0.0016385043,0.0013261064,0.0015502652,0.0006434384,0.00012826418],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028659205,0.00024652117,0.37976012,0.0028617748,0.00011368008,0.004959263,0.2616555,0.0024366213,0.0071001127,0.022870585,0.018436333,0.29927292],"study_design_scores_gemma":[0.000023473252,0.00012230458,0.49644524,0.0028529267,0.00013390463,0.00037744024,0.39930505,0.0033245974,0.0020584234,0.0010927679,0.0940921,0.0001717],"about_ca_topic_score_codex":0.96875405,"about_ca_topic_score_gemma":0.9817578,"teacher_disagreement_score":0.052199546,"about_ca_system_score_codex":0.052199546,"about_ca_system_score_gemma":0.06797098,"threshold_uncertainty_score":0.37873596},"labels":[],"label_agreement":null},{"id":"W4223627082","doi":"10.1016/j.dibe.2022.100075","title":"Development of quality improvement procedures and tools for facility management BIM","year":2022,"lang":"en","type":"article","venue":"Developments in the Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":60,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Mitacs","keywords":"Building information modeling; Maintainability; Facility management; Quality (philosophy); Checklist; Systems engineering; Process (computing); Interoperability; Process management; Quality assurance; Computer science; Documentation; Quality function deployment; Engineering; Engineering management; Construction engineering; Risk analysis (engineering); Software engineering; Operations management","score_opus":0.023807002306515425,"score_gpt":0.23523993505536686,"score_spread":0.21143293274885144,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4223627082","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036669502,0.000091701775,0.9854196,0.0001615546,0.000034337474,0.00086455554,0.00023527652,0.0070534847,0.0024725092],"genre_scores_gemma":[0.019440502,0.000102174556,0.97809225,0.00003765727,0.000011457983,0.0007148491,0.0005605716,0.00046179994,0.00057871867],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97098285,0.010044056,0.0031955412,0.0021536164,0.01249494,0.0011290516],"domain_scores_gemma":[0.94064677,0.01979496,0.005938731,0.014330303,0.01845353,0.0008356902],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029307738,0.0017234187,0.0010588126,0.00917026,0.0016142318,0.0063672075,0.0044846362,0.0018310472,0.0041489047],"category_scores_gemma":[0.07048852,0.0016101717,0.0019011488,0.0050819726,0.0016892336,0.0050291414,0.004335586,0.0032087106,0.0020442498],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001424234,0.0008091406,0.0037103654,0.0013129141,0.00010534947,0.0004853448,0.0052571255,0.043688655,0.019329425,0.06228149,0.010326968,0.8525508],"study_design_scores_gemma":[0.0002665002,0.0012417326,0.016678613,0.0037303173,0.00031315777,0.0016691581,0.0047499468,0.47541553,0.1470007,0.06986011,0.27831823,0.0007561846],"about_ca_topic_score_codex":0.004801199,"about_ca_topic_score_gemma":0.0024217444,"teacher_disagreement_score":0.029307738,"about_ca_system_score_codex":0.0031415888,"about_ca_system_score_gemma":0.008858154,"threshold_uncertainty_score":0.15499598},"labels":[],"label_agreement":null},{"id":"W4224117591","doi":"10.1061/9780784484180.036","title":"An Overview of the Upcoming ASCE Report on Design of Modular Structures for Industrial Facilities","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dow Chemical (Canada)","funders":"","keywords":"Modular programming; Modular design; Engineering; Task (project management); Construction engineering; Engineering management; Prefabrication; Manufacturing engineering; Systems engineering; Architectural engineering; Civil engineering; Computer science","score_opus":0.09646837664802987,"score_gpt":0.27292426223225863,"score_spread":0.17645588558422876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224117591","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01008727,0.036623124,0.36692595,0.0053461464,0.0030878366,0.0012567869,0.006772673,0.0043511516,0.565549],"genre_scores_gemma":[0.047280144,0.08504206,0.4092885,0.0016190866,0.0009736069,0.0010866743,0.018732911,0.001866484,0.4341105],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99645704,0.000356668,0.00017013139,0.00011876405,0.0027232291,0.00017417423],"domain_scores_gemma":[0.9976706,0.00027763832,0.00015272314,0.0002116912,0.001554603,0.00013280324],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036388487,0.0011143809,0.000377039,0.0031133147,0.00051691465,0.001955318,0.001179843,0.0011848306,0.030340478],"category_scores_gemma":[0.0024685888,0.0006070793,0.00062349526,0.0027367298,0.00039008365,0.0020242918,0.0010660478,0.0010946904,0.01670772],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044323428,0.00022532007,0.0010182151,0.001394738,0.000018120953,0.00024464118,0.00032493577,0.029402021,0.009510606,0.037840337,0.2763992,0.6435776],"study_design_scores_gemma":[0.0000029551115,0.000050627266,0.0006575457,0.00033236467,0.000004538863,0.00014512226,0.000068704445,0.0011379642,0.0017071303,0.0017489393,0.99412894,0.000015274782],"about_ca_topic_score_codex":0.004279728,"about_ca_topic_score_gemma":0.007847082,"teacher_disagreement_score":0.030340478,"about_ca_system_score_codex":0.001690441,"about_ca_system_score_gemma":0.0040755747,"threshold_uncertainty_score":0.10149896},"labels":[],"label_agreement":null},{"id":"W4224210734","doi":"10.36680/j.itcon.2022.022","title":"Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"Istanbul Teknik Üniversitesi; Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Facility management; Building information modeling; Software deployment; Occupancy; Process (computing); Post-occupancy evaluation; Systems engineering; Resource (disambiguation); System deployment; Engineering; Computer science; Architectural engineering; Process management; Software engineering; Operations management","score_opus":0.005306839171041152,"score_gpt":0.2184612841904609,"score_spread":0.21315444501941974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224210734","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18739793,0.0004191753,0.5448023,0.00034505417,0.00017320582,0.0030967088,0.019881291,0.21712095,0.026763463],"genre_scores_gemma":[0.67007846,0.00032800544,0.29737604,0.0002316545,0.000067059096,0.002760338,0.012382602,0.0031247823,0.013651004],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989837,0.00021918057,0.00006993944,0.00013948251,0.0005112969,0.000076486685],"domain_scores_gemma":[0.999057,0.00023870416,0.000121804725,0.00013156397,0.00033474603,0.00011613236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013956286,0.0009634904,0.00071006885,0.0011329408,0.00022040747,0.00081214565,0.0010886551,0.00042084733,0.010949932],"category_scores_gemma":[0.002268687,0.00031500656,0.0003155834,0.0006043351,0.00017350013,0.000982583,0.0011173477,0.000347883,0.0027105052],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0029187016,0.0011447199,0.014720161,0.0013030206,0.00016461524,0.000733293,0.0025850397,0.017524404,0.09941979,0.0036382745,0.117032126,0.73881584],"study_design_scores_gemma":[0.00086379633,0.0030501182,0.09507095,0.00044729054,0.00026068973,0.0014356372,0.0027348255,0.43652242,0.16665949,0.0048666205,0.28751272,0.0005754742],"about_ca_topic_score_codex":0.0018859952,"about_ca_topic_score_gemma":0.0025865235,"teacher_disagreement_score":0.010949932,"about_ca_system_score_codex":0.00043622815,"about_ca_system_score_gemma":0.0006394159,"threshold_uncertainty_score":0.036631227},"labels":[],"label_agreement":null},{"id":"W4224434769","doi":"10.18280/ijsdp.170228","title":"Monitoring the Construction Industry Towards a Construction Revolution 4.0","year":2022,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Dashboard; Key (lock); Productivity; Industry 4.0; Construction industry; Construction management; Engineering; Process management; Business; Environmental economics; Computer science; Construction engineering; Data science; Civil engineering; Computer security","score_opus":0.011547741599606141,"score_gpt":0.22898601087997245,"score_spread":0.2174382692803663,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224434769","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36643904,0.011432913,0.08246097,0.05558443,0.00084888324,0.00068242644,0.00094575447,0.0022215685,0.4793841],"genre_scores_gemma":[0.8859242,0.01223149,0.06462071,0.0043242797,0.00025797295,0.00035846952,0.00072149106,0.00027507887,0.031286236],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9937364,0.0022350654,0.00024528868,0.0003937241,0.0029660142,0.00042336035],"domain_scores_gemma":[0.9941742,0.0017614099,0.0010168591,0.00042738527,0.0022730355,0.00034723483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005798465,0.00048138993,0.00023301807,0.0035326097,0.0016061967,0.007710587,0.00076297997,0.0014616193,0.004620617],"category_scores_gemma":[0.007719184,0.0002902328,0.00032607437,0.004969615,0.0032468138,0.007648128,0.0040634302,0.0019581367,0.0012091283],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013414143,0.0003535177,0.026606252,0.0024618432,0.000045206525,0.00057750347,0.04007267,0.0029310668,0.013552346,0.24539363,0.045298904,0.62257296],"study_design_scores_gemma":[0.000015474623,0.00030770636,0.057292975,0.0022477256,0.000059276863,0.00042482436,0.04991406,0.0037105768,0.007445721,0.037091296,0.84138143,0.00010906937],"about_ca_topic_score_codex":0.0042791124,"about_ca_topic_score_gemma":0.004666841,"teacher_disagreement_score":0.007710587,"about_ca_system_score_codex":0.0041394527,"about_ca_system_score_gemma":0.0057396106,"threshold_uncertainty_score":0.030665576},"labels":[],"label_agreement":null},{"id":"W4224920910","doi":"10.18280/ijdne.170210","title":"Constraint-Based Design Formation - A Case Study of Wind Effects on High-Rise Building Designs","year":2022,"lang":"en","type":"article","venue":"International Journal of Design & Nature and Ecodynamics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Constraint (computer-aided design); Process (computing); Engineering design process; Design process; Computer science; Control (management); Industrial engineering; Systems engineering; Engineering; Artificial intelligence; Work in process; Mechanical engineering; Operations management","score_opus":0.011257823974884361,"score_gpt":0.23846209133054933,"score_spread":0.22720426735566496,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224920910","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9488201,0.00017337786,0.032824274,0.00026952606,0.000025001733,0.00025071827,0.000105899904,0.00010192718,0.017429117],"genre_scores_gemma":[0.9782672,0.00012255844,0.018190539,0.00002402056,0.000004546889,0.00006881957,0.000058155187,0.00003562938,0.003228426],"study_design_codex":"simulation_or_modeling","study_design_gemma":"qualitative","domain_scores_codex":[0.9957854,0.002548413,0.0001414295,0.00023904874,0.0009655932,0.0003201823],"domain_scores_gemma":[0.9920249,0.005551355,0.00044715314,0.0011664426,0.000494141,0.00031608486],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003951136,0.00056872034,0.0003954828,0.0008026868,0.0031270017,0.0021464466,0.001623722,0.0030222796,0.0034292683],"category_scores_gemma":[0.007634919,0.0004463643,0.0009700333,0.0012193234,0.0032047888,0.0016376504,0.0019234327,0.0013825295,0.00044565002],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013353118,0.0021419958,0.040272146,0.0012847331,0.00018178509,0.04710684,0.07588118,0.55212814,0.03665556,0.09190433,0.0055262586,0.14558174],"study_design_scores_gemma":[0.00063937606,0.0046917573,0.049716234,0.00071673334,0.00033076399,0.013119223,0.10181926,0.52206886,0.07116158,0.0497944,0.18543014,0.0005116881],"about_ca_topic_score_codex":0.0046245065,"about_ca_topic_score_gemma":0.0137328245,"teacher_disagreement_score":0.0046245065,"about_ca_system_score_codex":0.001980791,"about_ca_system_score_gemma":0.00127563,"threshold_uncertainty_score":0.020895839},"labels":[],"label_agreement":null},{"id":"W4224983266","doi":"10.18280/mmep.090207","title":"Investigating the Optimal Design Variables of Concrete Slabs with Impact Resistance by Development a Multi-Objective Model to Save Cost-Time of Construction","year":2022,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Deflection (physics); Slab; Minification; Structural engineering; Total cost; Engineering; Computer science; Mathematical optimization; Mathematics","score_opus":0.02093996832522581,"score_gpt":0.2020222355901973,"score_spread":0.18108226726497148,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4224983266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.090463884,0.0007223237,0.8943201,0.00031906253,0.000059807942,0.00017887395,0.00021804603,0.00016110766,0.013556869],"genre_scores_gemma":[0.871169,0.0008431785,0.11697413,0.00008031586,0.000025070167,0.000695106,0.00025325525,0.00006145998,0.0098984605],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996866,0.00011058272,0.000012793227,0.000054873246,0.00006828565,0.00006687101],"domain_scores_gemma":[0.9996911,0.00017645265,0.00004759959,0.000009506274,0.000057123547,0.000018332283],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008532473,0.0010530073,0.0010275631,0.000818997,0.0004644567,0.0016595894,0.001088075,0.0017819749,0.0034955747],"category_scores_gemma":[0.001103096,0.0008959289,0.0013228328,0.00080051675,0.00063974294,0.0008536559,0.0007906917,0.0011313758,0.0002747432],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000602046,0.000009114697,0.00012570397,0.000026864673,0.0000056105678,0.000017767103,0.00000781852,0.9976138,0.000283962,0.00084239186,0.000052400406,0.0010086471],"study_design_scores_gemma":[0.0000031142827,0.000011732104,0.000064849155,0.000004982232,0.000005142607,0.0000032565392,0.000010313594,0.9992778,0.0001471403,0.00032037473,0.00014921644,0.0000021402316],"about_ca_topic_score_codex":0.013295321,"about_ca_topic_score_gemma":0.011185719,"teacher_disagreement_score":0.013295321,"about_ca_system_score_codex":0.0011271429,"about_ca_system_score_gemma":0.0020308006,"threshold_uncertainty_score":0.026435852},"labels":[],"label_agreement":null},{"id":"W4225088704","doi":"10.36680/j.itcon.2022.007","title":"A simulation-based statistical method for planning modular construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workstation; Modular design; Process (computing); Engineering; Production line; Crew; Wafer fabrication; Production (economics); Reliability engineering; Industrial engineering; Computer science; Mechanical engineering; Operating system","score_opus":0.007430963568854501,"score_gpt":0.2555881924478268,"score_spread":0.24815722887897232,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225088704","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018146917,0.000041509058,0.9804992,0.000042997108,0.000010680955,0.000047641595,0.000078092766,0.00034401147,0.00078891474],"genre_scores_gemma":[0.69845873,0.00017926894,0.29912075,0.0000395424,0.000021225738,0.00041028165,0.00043035098,0.000072879375,0.0012669169],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957865,0.00014798489,0.000023719074,0.00007883824,0.00012952047,0.000041295338],"domain_scores_gemma":[0.9981285,0.0014002327,0.00014497717,0.0000722368,0.00021052713,0.000043605123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010610971,0.0005897139,0.0005815695,0.0009740476,0.00039788752,0.00063042575,0.0008467509,0.0006020158,0.001545559],"category_scores_gemma":[0.0034606005,0.00057915115,0.00069660693,0.0010041336,0.00041417277,0.00057273655,0.0004435612,0.0007423285,0.0001867733],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009880576,0.000007620561,0.0003521703,0.000006122107,0.000005323221,0.000006886363,0.0000060618777,0.9931995,0.0002464264,0.0010036044,0.00005133972,0.005104981],"study_design_scores_gemma":[0.0000010916871,0.000003935668,0.000041608815,6.571417e-7,8.4401046e-7,0.0000013431387,0.0000012043251,0.9995832,0.00008787787,0.00022053423,0.000056578596,0.0000011593231],"about_ca_topic_score_codex":0.020773835,"about_ca_topic_score_gemma":0.0152778635,"teacher_disagreement_score":0.020773835,"about_ca_system_score_codex":0.0011793504,"about_ca_system_score_gemma":0.0021265158,"threshold_uncertainty_score":0.04130584},"labels":[],"label_agreement":null},{"id":"W4225296624","doi":"10.36834/cmej.75247","title":"Arscience 2.0","year":2022,"lang":"en","type":"article","venue":"Canadian Medical Education Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Computer science","score_opus":0.004741862397707122,"score_gpt":0.21448261253930243,"score_spread":0.2097407501415953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4225296624","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0008285336,0.004101216,0.00935206,0.0044282996,0.0033694413,0.0003347773,0.008558721,0.02180998,0.9472169],"genre_scores_gemma":[0.00870434,0.0045582526,0.012802535,0.0036794543,0.0008668764,0.0004826914,0.013104157,0.0073005445,0.94850105],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9977227,0.0002640402,0.00014377786,0.000534279,0.0010224046,0.00031277598],"domain_scores_gemma":[0.99257964,0.0009942289,0.0004970578,0.0012407557,0.002065773,0.0026224237],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002953031,0.0018869154,0.0017759105,0.004991914,0.001627605,0.009284596,0.0035079012,0.0040037753,0.8769591],"category_scores_gemma":[0.010549543,0.000860815,0.0014544583,0.0026106008,0.0020082623,0.0023940804,0.0055087805,0.0031312795,0.883941],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017646192,0.00015653086,0.0005890873,0.0014590912,0.00003925513,0.00041080566,0.00023634847,0.0004356734,0.0019593593,0.015589369,0.6684494,0.31049857],"study_design_scores_gemma":[0.00002789836,0.000025285395,0.00055642705,0.00047315445,0.000010249354,0.00031923753,0.000079808015,0.00014326847,0.0002267246,0.002669294,0.9954535,0.000015116508],"about_ca_topic_score_codex":0.0076187253,"about_ca_topic_score_gemma":0.0066169812,"teacher_disagreement_score":0.8769591,"about_ca_system_score_codex":0.0020916935,"about_ca_system_score_gemma":0.0062309373,"threshold_uncertainty_score":0.17550284},"labels":[],"label_agreement":null},{"id":"W4226047702","doi":"10.1016/j.procs.2022.01.310","title":"Modular Robotic Prefabrication of Discrete Aggregations Driven by BIM and Computational Design","year":2022,"lang":"en","type":"article","venue":"Procedia Computer Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Mitacs","keywords":"Prefabrication; Modular design; Computer science; Adaptability; Process (computing); Architecture; Design process; Engineering design process; Systems engineering; Distributed computing; Work in process; Engineering; Operating system","score_opus":0.008630916063125722,"score_gpt":0.19822316044246377,"score_spread":0.18959224437933805,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226047702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037890505,0.000096144206,0.9523968,0.000070744936,0.000020125726,0.000069186375,0.000042725707,0.0003514489,0.009062405],"genre_scores_gemma":[0.5170905,0.00016286691,0.47940725,0.000024345201,0.0000076117512,0.00017645255,0.00014218136,0.00012208817,0.0028667583],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991941,0.00020724718,0.000031319767,0.00012303382,0.00036532685,0.00007901832],"domain_scores_gemma":[0.99943143,0.00021246806,0.00006701001,0.00019107953,0.00006946567,0.000028603888],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009904158,0.0006433523,0.00065249583,0.0006445346,0.0007045084,0.0014503822,0.0011475519,0.0006753098,0.0026405978],"category_scores_gemma":[0.0012497689,0.0004656128,0.001086263,0.00067175296,0.0014221105,0.0012424948,0.002037116,0.00087318465,0.00042916962],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053460823,0.000070614806,0.00076724746,0.00015264789,0.00002606643,0.00021994232,0.00045269288,0.8466678,0.019225668,0.0851086,0.0005142763,0.04674096],"study_design_scores_gemma":[0.000013697811,0.00007831765,0.0006029167,0.000027292082,0.000015199547,0.000119662174,0.00012408261,0.95882165,0.007983127,0.02367302,0.008519505,0.000021537497],"about_ca_topic_score_codex":0.0017854671,"about_ca_topic_score_gemma":0.0021375166,"teacher_disagreement_score":0.0026405978,"about_ca_system_score_codex":0.0008774775,"about_ca_system_score_gemma":0.0011236751,"threshold_uncertainty_score":0.008833706},"labels":[],"label_agreement":null},{"id":"W4226396538","doi":"10.2139/ssrn.4083982","title":"Integrated Framework of Knowledge-Based Decision Support System for User-Centered Residential Design","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Decision support system; Computer science; Knowledge management; User-centered design; Human–computer interaction; Process management; Engineering; Artificial intelligence","score_opus":0.011068348169527592,"score_gpt":0.2353176399110334,"score_spread":0.22424929174150582,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4226396538","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011514082,0.00032950396,0.9713225,0.00037219818,0.00003876571,0.0002675255,0.00042121374,0.004126569,0.011607553],"genre_scores_gemma":[0.33185202,0.00062231434,0.66015404,0.00014527743,0.000032554286,0.00045913307,0.0018642396,0.00013852266,0.0047319187],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99857366,0.00033841393,0.00017351852,0.0002644724,0.00052522507,0.00012471863],"domain_scores_gemma":[0.9994454,0.00014234977,0.000041705527,0.0000865612,0.00021633769,0.00006761101],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014805251,0.00078769034,0.00094335136,0.0026673463,0.00077838864,0.0045221425,0.002397513,0.0012516004,0.005156697],"category_scores_gemma":[0.0017465001,0.00029835018,0.0009961392,0.0018975693,0.0006240806,0.0022603946,0.0023370464,0.0006935645,0.0012881322],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043396023,0.00092031225,0.0069467914,0.00091819285,0.00043077208,0.0012887636,0.0026156518,0.28313664,0.015930632,0.21871889,0.01391385,0.45474553],"study_design_scores_gemma":[0.000058986974,0.00012783371,0.0016214357,0.00022856056,0.00021418963,0.0003078365,0.0006084135,0.890806,0.0065490254,0.0594757,0.039910566,0.000091421905],"about_ca_topic_score_codex":0.011234662,"about_ca_topic_score_gemma":0.008253433,"teacher_disagreement_score":0.011234662,"about_ca_system_score_codex":0.0014001556,"about_ca_system_score_gemma":0.0035095667,"threshold_uncertainty_score":0.02233857},"labels":[],"label_agreement":null},{"id":"W4229557843","doi":"10.29173/mocs245","title":"Estimation Formulas for Embedded-length of Connection Embedded-type Foundation Unit Modular System","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Land, Infrastructure and Transport","keywords":"Modular design; Connection (principal bundle); Embedment; Column (typography); Unit (ring theory); Structural engineering; Foundation (evidence); Engineering; Computer science; Mathematics","score_opus":0.01889241507092315,"score_gpt":0.22775456898491067,"score_spread":0.20886215391398752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229557843","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035725176,0.0002735984,0.96164167,0.000040203337,0.000029862966,0.000043884123,0.00010351045,0.00036942176,0.0017726428],"genre_scores_gemma":[0.7032516,0.0007151069,0.29071835,0.000040909345,0.000053245993,0.0002372849,0.0005896732,0.00012710785,0.00426672],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999329,0.00009238561,0.000055329834,0.00022475893,0.00024604253,0.000052637322],"domain_scores_gemma":[0.99869734,0.00043771946,0.00021542705,0.000095358715,0.00051364023,0.00004065237],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007156664,0.0009588133,0.0004603693,0.0018084274,0.00041134076,0.000790784,0.001208202,0.00083664147,0.0051017157],"category_scores_gemma":[0.0041838307,0.00042217874,0.00065794203,0.00091413053,0.0005002109,0.0022639623,0.0008349093,0.0006365682,0.0011555579],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015636132,0.00007703464,0.02521433,0.000610645,0.00006969629,0.00040540533,0.0004604579,0.55231565,0.028711375,0.026007097,0.0028947075,0.3630773],"study_design_scores_gemma":[0.0000069301113,0.000056696204,0.0055309343,0.000041945972,0.000030943953,0.00019794017,0.00007973228,0.98163164,0.006222622,0.0044702752,0.0016877304,0.000042545948],"about_ca_topic_score_codex":0.0031786028,"about_ca_topic_score_gemma":0.0031339256,"teacher_disagreement_score":0.0051017157,"about_ca_system_score_codex":0.0009938901,"about_ca_system_score_gemma":0.0006229743,"threshold_uncertainty_score":0.017066896},"labels":[],"label_agreement":null},{"id":"W4229701415","doi":"10.1177/0361198105190700110","title":"Evaluation of Dowel Bars Installed in Airfield Concrete Pavement Construction Joints by Using Plastic Sleeves","year":2005,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Dowel; Structural engineering; Drilling; Bar (unit); Engineering; Consolidation (business); Installation; Geotechnical engineering; Forensic engineering; Geology; Mechanical engineering","score_opus":0.07483710276364233,"score_gpt":0.3494602198399551,"score_spread":0.2746231170763128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4229701415","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9956584,0.00021036234,0.0036182713,0.0000061305072,0.000017851866,0.000039440212,0.000030123545,0.000048092366,0.00037146176],"genre_scores_gemma":[0.98974365,0.0001776257,0.009253656,0.000006838679,0.000009594619,0.000010920844,0.000078884244,0.000019586148,0.0006993151],"study_design_codex":"bench_or_experimental","study_design_gemma":"observational","domain_scores_codex":[0.99705315,0.0005719664,0.00020184017,0.00027771585,0.0016688491,0.0002264162],"domain_scores_gemma":[0.9946926,0.0015846427,0.0011162047,0.00043685047,0.0018799084,0.0002898553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021665948,0.00084265403,0.0005219877,0.0009638962,0.00044252185,0.00034210845,0.0005667663,0.0005885485,0.0010843751],"category_scores_gemma":[0.004444401,0.00050049875,0.00042216489,0.00039684027,0.0004756611,0.00072564406,0.0005177334,0.00041922944,0.00031262715],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018847089,0.0006062927,0.017084384,0.0005529679,0.00006195235,0.00036869376,0.0003591206,0.0057448205,0.9268321,0.00009862236,0.00006379056,0.046342462],"study_design_scores_gemma":[0.0000738394,0.022874493,0.06942948,0.000033252618,0.00015783655,0.0009192329,0.00033173352,0.004240006,0.9005264,0.000041057825,0.0013141324,0.00005853491],"about_ca_topic_score_codex":0.0009237498,"about_ca_topic_score_gemma":0.0028706628,"teacher_disagreement_score":0.0021665948,"about_ca_system_score_codex":0.00032200397,"about_ca_system_score_gemma":0.00033851425,"threshold_uncertainty_score":0.011458218},"labels":[],"label_agreement":null},{"id":"W4230082142","doi":"10.29173/mocs191","title":"The Impact of Building Information Modelling (BIM) for Contractor Costing in Offsite Construction Projects in the UK","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Productivity; Status quo; Activity-based costing; Construction industry; Integrated project delivery; Construction management; Value (mathematics); Risk analysis (engineering); Building construction; Business; Construction engineering; Engineering management; Engineering; Operations management; Computer science; Marketing; Civil engineering; Economics","score_opus":0.019206303532829896,"score_gpt":0.2318636703462559,"score_spread":0.212657366813426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230082142","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9123141,0.001315138,0.0027350918,0.0074225226,0.000109905945,0.00017033966,0.00033507578,0.00011781677,0.07547994],"genre_scores_gemma":[0.99077046,0.0010026051,0.002285996,0.00016895669,0.000009029324,0.000030082452,0.00015150307,0.000038019803,0.0055433856],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9891889,0.004844091,0.00045238956,0.00040031475,0.003867285,0.0012470136],"domain_scores_gemma":[0.9898746,0.004231723,0.00090078346,0.0008183792,0.002936591,0.0012378807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009719393,0.00037759598,0.000330272,0.0015080143,0.0020583067,0.006084597,0.0008776828,0.0011824713,0.009826617],"category_scores_gemma":[0.021201223,0.00051220396,0.00042546986,0.0022913432,0.0016348563,0.0025875806,0.0055641965,0.0016104693,0.00076837785],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016519299,0.001384426,0.15549622,0.001233746,0.00007915452,0.003008395,0.050153967,0.024713308,0.0048331767,0.03424124,0.031290296,0.69191414],"study_design_scores_gemma":[0.00016156954,0.0020573642,0.558533,0.0021206182,0.00013483982,0.0017919979,0.11816019,0.048082072,0.0046039014,0.005545297,0.25846192,0.00034725948],"about_ca_topic_score_codex":0.23023453,"about_ca_topic_score_gemma":0.254814,"teacher_disagreement_score":0.23023453,"about_ca_system_score_codex":0.012864686,"about_ca_system_score_gemma":0.008951841,"threshold_uncertainty_score":0.45778883},"labels":[],"label_agreement":null},{"id":"W4230397293","doi":"10.5383/ijtee.04.0x.00xx","title":"A Standard Process for Sustainable Design","year":2015,"lang":"en","type":"article","venue":"International Journal of Thermal and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainable design; Sustainability; Process (computing); Design process; Building information modeling; Process management; Engineering design process; Exploratory research; Computer science; Knowledge management; Architectural engineering; Systems engineering; Business; Engineering; Work in process; Marketing; Operations management","score_opus":0.009071675924966952,"score_gpt":0.20139605159256213,"score_spread":0.1923243756675952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230397293","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014384643,0.00060082687,0.7495079,0.0058311247,0.0005904723,0.0022669693,0.00030474947,0.0009946353,0.22551863],"genre_scores_gemma":[0.20783311,0.00076984084,0.7396689,0.0013650337,0.00008664279,0.00293581,0.0007296545,0.00064971065,0.045961343],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.94230187,0.023138596,0.0043489435,0.0045716166,0.024456637,0.0011823818],"domain_scores_gemma":[0.96438974,0.007641754,0.0015788304,0.012888318,0.012794687,0.00070667866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.041069973,0.00093327294,0.0006422514,0.003960402,0.004125445,0.009996534,0.0024874299,0.0026194693,0.0077338587],"category_scores_gemma":[0.044857115,0.000678332,0.001226893,0.004328741,0.009180915,0.0073808744,0.008208269,0.0041591045,0.005594096],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028211338,0.00015601882,0.0012398548,0.00036748216,0.000028079945,0.00011402787,0.01589182,0.002761407,0.0025524413,0.8105043,0.010663584,0.15569268],"study_design_scores_gemma":[0.000029116636,0.0001703032,0.0010741815,0.0009997883,0.000019537621,0.00027229404,0.009388279,0.0042353855,0.005082659,0.34242794,0.636228,0.000072399154],"about_ca_topic_score_codex":0.0043075974,"about_ca_topic_score_gemma":0.004669072,"teacher_disagreement_score":0.041069973,"about_ca_system_score_codex":0.0062383083,"about_ca_system_score_gemma":0.019331291,"threshold_uncertainty_score":0.21720135},"labels":[],"label_agreement":null},{"id":"W4230732195","doi":"10.32920/ryerson.14665020","title":"Climate Change Impact on Design and Building Criteria of Infrastructure Assets - Simulation Model","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"","keywords":"Climate change; Investment (military); Asset (computer security); Contingency plan; Simulation modeling; Computer science; Environmental resource management; Risk analysis (engineering); Environmental economics; Environmental science; Business; Operations research; Engineering; Economics; Microeconomics","score_opus":0.03574128903893163,"score_gpt":0.30658048957534156,"score_spread":0.2708392005364099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230732195","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8572205,0.00018729913,0.090220176,0.00025612916,0.000047407248,0.00022479368,0.0020097857,0.00033884068,0.04949507],"genre_scores_gemma":[0.98544717,0.000112892005,0.008664568,0.000020051868,0.0000056104514,0.0001417883,0.0004348052,0.000030847892,0.0051423134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977404,0.00007497636,0.000010748407,0.000033450437,0.00004774681,0.000059072678],"domain_scores_gemma":[0.9994394,0.00031222485,0.00006105652,0.00004364657,0.00011146403,0.00003213472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048162398,0.0004883715,0.0005074941,0.0006072159,0.0003928143,0.000761561,0.0007872191,0.0010213421,0.0046492545],"category_scores_gemma":[0.0010847698,0.00031688283,0.000901552,0.00062208314,0.000453539,0.00054395787,0.0004518375,0.00053784845,0.00038593647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014374162,0.00001589781,0.00051674765,0.000007220714,0.00000351623,0.000015931655,0.000007588056,0.9979304,0.00028958084,0.00067930634,0.000050860275,0.00046853456],"study_design_scores_gemma":[0.000010008568,0.000020885487,0.00047236256,0.0000029280693,0.000005330938,0.000009583663,0.000011744647,0.9983323,0.00040259806,0.00036255067,0.000364555,0.0000052078053],"about_ca_topic_score_codex":0.023390107,"about_ca_topic_score_gemma":0.010751912,"teacher_disagreement_score":0.023390107,"about_ca_system_score_codex":0.0010373964,"about_ca_system_score_gemma":0.0009979003,"threshold_uncertainty_score":0.046507955},"labels":[],"label_agreement":null},{"id":"W4230746207","doi":"10.32920/ryerson.14649519","title":"Investigating building information model to building energy model data transfer integrity and simulation results","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Sciencetech (Canada); University of Waterloo","funders":"Lawrence Berkeley National Laboratory; Construction Industry Council; U.S. General Services Administration; U.S. Department of Energy","keywords":"Building information modeling; Reliability (semiconductor); Building energy simulation; Energy modeling; Computer science; Process (computing); Energy (signal processing); Reliability engineering; Efficient energy use; Energy performance; Simulation; Engineering; Operating system","score_opus":0.058715359176305736,"score_gpt":0.27941112992775324,"score_spread":0.2206957707514475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230746207","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8806947,0.00017865053,0.09690685,0.00035837007,0.00006999786,0.00018986662,0.0023915959,0.006441622,0.012768255],"genre_scores_gemma":[0.96780896,0.00007809546,0.027156722,0.00003415032,0.000006715048,0.00007743526,0.003041095,0.00076185353,0.0010350419],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99529856,0.0014498621,0.0003522016,0.0005396179,0.0020845148,0.00027533167],"domain_scores_gemma":[0.9787346,0.009500478,0.0008343412,0.0054051676,0.0052811904,0.0002443067],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006858784,0.00085804577,0.0007641092,0.001311764,0.0006224007,0.0019498856,0.0013878358,0.0007257671,0.0046368497],"category_scores_gemma":[0.032794446,0.0005863757,0.0008541462,0.0015047244,0.0007138178,0.0021857698,0.0015075317,0.0011646193,0.0013235058],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018177618,0.0009842898,0.06037707,0.00040180373,0.00023093692,0.00030062717,0.0010919519,0.81059855,0.020420672,0.009107496,0.0032104994,0.091458276],"study_design_scores_gemma":[0.0000558919,0.00026440757,0.013797936,0.000045740355,0.00005939406,0.00007341402,0.0003759868,0.93163,0.048900288,0.0012259762,0.003535326,0.00003570653],"about_ca_topic_score_codex":0.0125966985,"about_ca_topic_score_gemma":0.005350877,"teacher_disagreement_score":0.0125966985,"about_ca_system_score_codex":0.0014168472,"about_ca_system_score_gemma":0.0013290828,"threshold_uncertainty_score":0.03627312},"labels":[],"label_agreement":null},{"id":"W4230974727","doi":"10.21432/t2q10v","title":"Project Management for Computer-Based Training Development","year":2017,"lang":"en","type":"article","venue":"Canadian Journal of Learning and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Project management; Project management triangle; Computer science; Mandate; Project charter; Project manager; Engineering management; OPM3; Estimation; Management development; Process management; Knowledge management; Business; Management; Engineering; Political science; Systems engineering","score_opus":0.0170514334088074,"score_gpt":0.22478283236163535,"score_spread":0.20773139895282794,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4230974727","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011694666,0.0045189126,0.77254474,0.007507294,0.0008129956,0.0036091926,0.0005429352,0.0027267933,0.19604252],"genre_scores_gemma":[0.122366905,0.0043860367,0.8018108,0.0006545286,0.00040577966,0.0053567975,0.0010482705,0.0006244701,0.06334639],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9746609,0.013112117,0.002048488,0.0012339402,0.008247777,0.00069678016],"domain_scores_gemma":[0.9714494,0.010343765,0.0033820148,0.0051588365,0.0075931433,0.002072923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020708112,0.0007303384,0.00042830355,0.0041704997,0.0029095819,0.005790765,0.0018230372,0.00092257344,0.024185283],"category_scores_gemma":[0.044830177,0.00051181205,0.00034283838,0.007692076,0.0017849853,0.003240054,0.004474355,0.0018017483,0.006470067],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054735687,0.000112057205,0.0015878003,0.000490283,0.00001241896,0.00012203514,0.0019459351,0.0027634506,0.0010041684,0.10745404,0.040417038,0.8440361],"study_design_scores_gemma":[0.00003676362,0.00026223873,0.00562507,0.0009061185,0.00001810645,0.000480512,0.0019728732,0.006679404,0.0014456332,0.05718812,0.9253223,0.00006284996],"about_ca_topic_score_codex":0.004952317,"about_ca_topic_score_gemma":0.006401328,"teacher_disagreement_score":0.024185283,"about_ca_system_score_codex":0.0050212876,"about_ca_system_score_gemma":0.011994793,"threshold_uncertainty_score":0.10951626},"labels":[],"label_agreement":null},{"id":"W4231392469","doi":"10.1109/wsc.2017.8247979","title":"Synthesizing engineering design, material takeoff and simulation-based estimating on a bridge deck reinforcement case","year":2017,"lang":"en","type":"article","venue":"2017 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Takeoff; Bridge (graph theory); Reinforcement; Computer science; Deck; Bridge deck; Structural engineering; Engineering; Aerospace engineering","score_opus":0.06019469213135643,"score_gpt":0.28410387024245454,"score_spread":0.22390917811109812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231392469","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6932518,0.00038349762,0.27480215,0.0003465802,0.000038174014,0.00038644593,0.0005664064,0.00031955194,0.02990542],"genre_scores_gemma":[0.9145742,0.00021875933,0.082606934,0.000020645977,0.0000059794666,0.00023686164,0.00032815716,0.00004929599,0.0019591255],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922335,0.00030031247,0.000048643706,0.00008430592,0.0002508769,0.0000925907],"domain_scores_gemma":[0.99678326,0.0023321446,0.00019685195,0.0002253368,0.00040223412,0.000060152848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017750536,0.00068879017,0.00077464397,0.0016078546,0.00048931205,0.001543165,0.00092576543,0.0015184603,0.0032894427],"category_scores_gemma":[0.0049434965,0.00066247483,0.00076789956,0.0011559047,0.0005462877,0.000764418,0.0006647517,0.00082201697,0.00027501414],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037224305,0.00005790441,0.0017187684,0.000048050973,0.000008003007,0.000110252746,0.00006059355,0.9882429,0.00072853855,0.0030617777,0.00009795465,0.005828125],"study_design_scores_gemma":[0.000008527429,0.000030519557,0.0006163232,0.000012623822,0.000010254485,0.000016061062,0.00008635913,0.99720156,0.0008060801,0.0005919799,0.0006116678,0.000008061358],"about_ca_topic_score_codex":0.029910626,"about_ca_topic_score_gemma":0.028564686,"teacher_disagreement_score":0.029910626,"about_ca_system_score_codex":0.0021556283,"about_ca_system_score_gemma":0.002069561,"threshold_uncertainty_score":0.059473038},"labels":[],"label_agreement":null},{"id":"W4231484164","doi":"10.1109/wsc.1999.816811","title":"Simphony: an environment for building special purpose construction simulation tools","year":2003,"lang":"en","type":"article","venue":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":30,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Process (computing); Set (abstract data type); Software engineering; Systems engineering; Identification (biology); Development environment; Engineering; Programming language","score_opus":0.02751389622759264,"score_gpt":0.2587370734141346,"score_spread":0.23122317718654195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231484164","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033675097,0.0001343645,0.9095964,0.00012301227,0.00007000611,0.0003084778,0.0013109145,0.07529139,0.009797952],"genre_scores_gemma":[0.061875943,0.0007210032,0.88029146,0.00024728203,0.00007826471,0.0020734319,0.009526396,0.030933242,0.014253086],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983443,0.00040128006,0.00015720453,0.00017698831,0.0007441601,0.00017598989],"domain_scores_gemma":[0.9983734,0.00078270753,0.000108347165,0.00032889794,0.0001846649,0.00022197033],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034953775,0.0012759222,0.0011751166,0.0015792127,0.00080113905,0.0025990447,0.004182552,0.001400463,0.02841678],"category_scores_gemma":[0.004338957,0.0018252999,0.0016162643,0.001023705,0.0012897673,0.0034006485,0.0056888866,0.0028051133,0.011388736],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017209859,0.0008269981,0.004300276,0.0016519161,0.00027558915,0.0023050515,0.003680609,0.13335195,0.04696913,0.21194214,0.1858974,0.40707794],"study_design_scores_gemma":[0.0005871426,0.00022660791,0.0012339785,0.00032118132,0.000062190724,0.0008532762,0.00023317462,0.29179978,0.032432802,0.05323579,0.61882085,0.0001931381],"about_ca_topic_score_codex":0.000975205,"about_ca_topic_score_gemma":0.0015190872,"teacher_disagreement_score":0.02841678,"about_ca_system_score_codex":0.00066771306,"about_ca_system_score_gemma":0.0015561057,"threshold_uncertainty_score":0.09506363},"labels":[],"label_agreement":null},{"id":"W4231934320","doi":"10.32920/ryerson.14654727","title":"Design of a Two Story ISO Shipping Container Building","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Container (type theory); Factory (object-oriented programming); Manufacturing engineering; Business; Architectural engineering; Computer science; Engineering; Mechanical engineering","score_opus":0.023170987559213797,"score_gpt":0.24244309872778408,"score_spread":0.2192721111685703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4231934320","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.61452836,0.00026692593,0.2542601,0.0010605117,0.0003973346,0.001343189,0.0011063308,0.0016755546,0.12536177],"genre_scores_gemma":[0.79823345,0.00021852339,0.15477434,0.00011072504,0.000014613497,0.00051733776,0.0005685283,0.0003531448,0.045209307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993926,0.00023918775,0.000024356952,0.00008120478,0.00017129716,0.00009139098],"domain_scores_gemma":[0.9997594,0.000044944096,0.000012533972,0.00004246088,0.00004257823,0.00009815615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005537051,0.0006853539,0.0005072936,0.00048305065,0.001199974,0.0022084077,0.0015282123,0.0017426801,0.013243544],"category_scores_gemma":[0.000550418,0.00046272442,0.0006062915,0.00042014022,0.0011201276,0.0007404883,0.0018487137,0.00072085793,0.0021796487],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020499313,0.0019974876,0.008855556,0.0014733066,0.00017845842,0.023607468,0.012224909,0.56564164,0.15183213,0.08137765,0.015819537,0.13494201],"study_design_scores_gemma":[0.00042387657,0.0034954117,0.017558418,0.00029449604,0.00022217585,0.0055442,0.015284047,0.64151746,0.043794982,0.012536755,0.2590165,0.000311748],"about_ca_topic_score_codex":0.0025876397,"about_ca_topic_score_gemma":0.004383987,"teacher_disagreement_score":0.013243544,"about_ca_system_score_codex":0.00066960603,"about_ca_system_score_gemma":0.0011083009,"threshold_uncertainty_score":0.044304132},"labels":[],"label_agreement":null},{"id":"W4232096617","doi":"10.1109/wsc.2013.6721688","title":"Assessment of construction operations productivity rate as computed by simulation models","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Natural Sciences and Engineering Research Council of Canada; Concordia University","keywords":"Discrete event simulation; Productivity; Credibility; Duration (music); Simulation modeling; Process (computing); Computer science; Industrial engineering; Simulation; Operations research; Engineering; Mathematics","score_opus":0.020094328326755326,"score_gpt":0.25853768443047775,"score_spread":0.23844335610372241,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232096617","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85826087,0.000105080806,0.13000388,0.00016935916,0.00002653433,0.00017361285,0.00041284552,0.0005501794,0.0102976905],"genre_scores_gemma":[0.9867128,0.000061288236,0.012538705,0.0000069766606,0.0000034014568,0.00006800662,0.00016052212,0.00002305131,0.00042531514],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961642,0.0018020103,0.00023389605,0.00021007196,0.0013486333,0.00024113274],"domain_scores_gemma":[0.9818029,0.01172826,0.001384299,0.0020616378,0.0027883798,0.00023454404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0074971,0.00071268366,0.000621769,0.0013809581,0.0003141662,0.0016579753,0.0007995222,0.0006624269,0.0012357809],"category_scores_gemma":[0.025333695,0.0003280928,0.00062019,0.0012459382,0.00038840162,0.0014670506,0.0007571713,0.0007615943,0.00017518793],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002637867,0.000091652415,0.01260983,0.00005494304,0.000047833455,0.00005279504,0.0001899276,0.9676033,0.0026448537,0.004003626,0.00017794706,0.01225937],"study_design_scores_gemma":[0.000018914867,0.00027009228,0.0050972267,0.00002391866,0.000024139132,0.000029718805,0.0001564573,0.9890063,0.003391768,0.0012561092,0.00070370716,0.000021649283],"about_ca_topic_score_codex":0.0054252474,"about_ca_topic_score_gemma":0.0024630034,"teacher_disagreement_score":0.0074971,"about_ca_system_score_codex":0.001527917,"about_ca_system_score_gemma":0.0012185618,"threshold_uncertainty_score":0.03964895},"labels":[],"label_agreement":null},{"id":"W4232777831","doi":"10.2172/823770","title":"ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM","year":2004,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Tsinghua University","keywords":"Combustion; Fluidized bed combustion; Engineering; Work (physics); Fluidized bed; Quarter (Canadian coin); National laboratory; Control (management); Environmental science; Waste management; Mechanical engineering; Computer science; Engineering physics","score_opus":0.00436543696027485,"score_gpt":0.18344140084284233,"score_spread":0.17907596388256747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232777831","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24113378,0.0009453066,0.6876089,0.0011914314,0.0006667626,0.00408951,0.001245863,0.011358001,0.05176047],"genre_scores_gemma":[0.31392473,0.00037105885,0.6513082,0.00023592022,0.00013327242,0.0015317437,0.0030852205,0.00032489185,0.0290851],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99371827,0.00073685934,0.00026539157,0.00053976406,0.004204414,0.0005352957],"domain_scores_gemma":[0.9964014,0.00028220264,0.00017351496,0.0003969612,0.0022392692,0.0005066377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008015189,0.0005656958,0.0006276437,0.001417726,0.0015841986,0.0021799183,0.002130708,0.00068920647,0.0056359996],"category_scores_gemma":[0.0029287196,0.00040391486,0.00033568454,0.0009274261,0.0009407431,0.0015936944,0.0017945076,0.0016602491,0.0023670504],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010960004,0.0035394498,0.018122476,0.00073992735,0.000047122234,0.00071664323,0.0016839487,0.026688144,0.39309835,0.051164206,0.026799832,0.47630394],"study_design_scores_gemma":[0.0005805274,0.00282495,0.012906213,0.00013948194,0.00007052803,0.0011223076,0.00061006955,0.062683165,0.5149766,0.0017198025,0.40218833,0.00017809821],"about_ca_topic_score_codex":0.008997721,"about_ca_topic_score_gemma":0.0073845778,"teacher_disagreement_score":0.008997721,"about_ca_system_score_codex":0.0025250583,"about_ca_system_score_gemma":0.014345125,"threshold_uncertainty_score":0.042388856},"labels":[],"label_agreement":null},{"id":"W4232991494","doi":"10.1061/9780784412329.119","title":"Change Management with Building Information Models: A Case Study","year":2012,"lang":"en","type":"article","venue":"Construction Research Congress 2012","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Computer science; Building information modeling; Context (archaeology); Ontology; Process (computing); Change management (ITSM); Process management; Information model; Position paper; Systems engineering; Software engineering; Engineering; World Wide Web","score_opus":0.0818108159702323,"score_gpt":0.32312618818141925,"score_spread":0.24131537221118693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4232991494","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8983939,0.0005320003,0.067705065,0.003364424,0.00008350998,0.0007148241,0.0003925368,0.00040876717,0.02840493],"genre_scores_gemma":[0.9290066,0.0005106179,0.06481754,0.00021987158,0.00002766966,0.00025529886,0.00031947042,0.00011839868,0.004724505],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99199134,0.004709094,0.00036278437,0.00040604855,0.0019193433,0.0006113395],"domain_scores_gemma":[0.98422897,0.010029321,0.0009901911,0.0029922791,0.0010287217,0.0007305422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006864539,0.00068560144,0.00053359236,0.0018840419,0.003945257,0.0037133251,0.0031967394,0.005179978,0.0021211659],"category_scores_gemma":[0.016072374,0.0007884973,0.000882049,0.003846152,0.0028895289,0.005016112,0.0035072498,0.0026339402,0.00054902345],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001212822,0.011276996,0.09558796,0.0014765118,0.0002491704,0.07052744,0.15478647,0.16620971,0.013239477,0.114336155,0.025217202,0.34588003],"study_design_scores_gemma":[0.00047700587,0.0028753271,0.039179564,0.0008651179,0.00037254803,0.022693915,0.12434196,0.3840496,0.03969324,0.03520734,0.34977198,0.0004723824],"about_ca_topic_score_codex":0.014845932,"about_ca_topic_score_gemma":0.027118886,"teacher_disagreement_score":0.014845932,"about_ca_system_score_codex":0.0041960725,"about_ca_system_score_gemma":0.0024264755,"threshold_uncertainty_score":0.03630358},"labels":[],"label_agreement":null},{"id":"W4234274816","doi":"10.1061/(asce)0733-9364(2003)129:4(471)","title":"Closure to “Improving Design Coordination for Building Projects. I: Information Model” by Tarek Hegazy, Essam Zaneldin, and Donald Grierson","year":2003,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Closure (psychology); Computer science; Sociology; Architectural engineering; Political science; Engineering","score_opus":0.005875316181565935,"score_gpt":0.18095947952348362,"score_spread":0.17508416334191768,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234274816","genre_codex":"methods","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009007164,0.017155452,0.74596614,0.13815328,0.012745009,0.00026562685,0.0004395849,0.00083682494,0.07543092],"genre_scores_gemma":[0.51444614,0.035076536,0.3181381,0.02675132,0.01301157,0.00125522,0.0022430513,0.001275784,0.08780228],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99257845,0.0034258715,0.00040138475,0.0010696113,0.0020785322,0.00044627892],"domain_scores_gemma":[0.98690003,0.00744552,0.0005789743,0.001990605,0.00248168,0.0006031662],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071231686,0.0013093051,0.0013453753,0.002035464,0.0024906928,0.00793176,0.0028647576,0.0048674056,0.013341007],"category_scores_gemma":[0.026575463,0.0009441336,0.0018259126,0.004781828,0.0051916996,0.014572359,0.0057976157,0.0055913245,0.0026947535],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015889421,0.00016309816,0.0007165309,0.00038505776,0.000073590556,0.00012921335,0.0015117583,0.027131915,0.00048958504,0.6627072,0.16774485,0.13878824],"study_design_scores_gemma":[0.00008807336,0.00012249262,0.0006705558,0.00063364854,0.0001181293,0.00016649945,0.0011555621,0.08192641,0.0017634894,0.64580065,0.2674451,0.000109329914],"about_ca_topic_score_codex":0.015219864,"about_ca_topic_score_gemma":0.0077834264,"teacher_disagreement_score":0.015219864,"about_ca_system_score_codex":0.00447825,"about_ca_system_score_gemma":0.0063044005,"threshold_uncertainty_score":0.04463011},"labels":[],"label_agreement":null},{"id":"W4234345597","doi":"10.1007/978-1-4614-6170-8_100151","title":"Virtual Settlement","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Settlement (finance); Computer science; World Wide Web","score_opus":0.0076023840723635425,"score_gpt":0.1800888076863955,"score_spread":0.17248642361403196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234345597","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007028497,0.00052032835,0.014577842,0.00029553217,0.00038718368,0.000015190633,0.00005105123,0.00014147398,0.98330855],"genre_scores_gemma":[0.03394829,0.0011935061,0.005969383,0.00016296483,0.0001416968,0.00003998831,0.00018766942,0.00017827336,0.9581782],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99961543,0.000073045165,0.000012784864,0.000066956476,0.00018392804,0.00004795465],"domain_scores_gemma":[0.9999044,0.000015590274,0.0000050671106,0.000031683427,0.000029016734,0.000014246289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00033648973,0.00086650724,0.0004477875,0.0011172045,0.0021697464,0.004975322,0.0012591819,0.0013010467,0.11948017],"category_scores_gemma":[0.0007684068,0.00031897452,0.00038436937,0.0011116046,0.0020038302,0.0032215593,0.0029307255,0.0013761498,0.031907808],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014098473,0.00002012296,0.000053277665,0.000056487446,0.0000021607723,0.00007501591,0.00045733387,0.001238379,0.00042177844,0.7946682,0.07385104,0.12914214],"study_design_scores_gemma":[0.0000033423387,0.0000098103565,0.000118042386,0.0000746459,0.0000025394115,0.0001784278,0.00034432192,0.0010448653,0.00040468056,0.08619561,0.9116166,0.000007105647],"about_ca_topic_score_codex":0.0024971694,"about_ca_topic_score_gemma":0.004595992,"teacher_disagreement_score":0.11948017,"about_ca_system_score_codex":0.0014866034,"about_ca_system_score_gemma":0.0011619609,"threshold_uncertainty_score":0.39970094},"labels":[],"label_agreement":null},{"id":"W4234390470","doi":"10.1139/cjce-28-1-1","title":"A fuzzy expert system for design performance prediction and evaluation","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Fuzzy logic; Computer science; Expert system; Engineering; Operations research; Data mining; Artificial intelligence","score_opus":0.01601565219101328,"score_gpt":0.191659534505783,"score_spread":0.1756438823147697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4234390470","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029241692,0.00034524553,0.95946056,0.00012320302,0.00006995243,0.00021069887,0.00047627615,0.003427148,0.006645164],"genre_scores_gemma":[0.4771169,0.0002835413,0.5133889,0.00010319613,0.000036571953,0.00042645956,0.00086017576,0.000074944655,0.0077093486],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993019,0.0001591622,0.00006492622,0.00014803043,0.00027979803,0.00004616599],"domain_scores_gemma":[0.999022,0.00031383362,0.000055586333,0.000091622256,0.00047679254,0.00004005933],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015176588,0.0006964477,0.0009068396,0.0013675503,0.00048924534,0.0011499259,0.0009031167,0.0012068413,0.0068639955],"category_scores_gemma":[0.0033742834,0.00028879638,0.0005088642,0.00070473464,0.00018291222,0.0007299891,0.00043783872,0.0005953974,0.0024256734],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046276939,0.00025080607,0.0020143967,0.00028324698,0.0001225942,0.00014770092,0.0001153539,0.24366298,0.01940012,0.0026834784,0.00615653,0.7247],"study_design_scores_gemma":[0.00003178906,0.00008753968,0.00075031235,0.000026837859,0.00003207614,0.000035385725,0.000019999685,0.99130124,0.004175243,0.00093716086,0.0025855873,0.000016747232],"about_ca_topic_score_codex":0.007895203,"about_ca_topic_score_gemma":0.010443307,"teacher_disagreement_score":0.007895203,"about_ca_system_score_codex":0.0007846899,"about_ca_system_score_gemma":0.001053493,"threshold_uncertainty_score":0.022962332},"labels":[],"label_agreement":null},{"id":"W4235729757","doi":"10.2172/1165978","title":"Fenestration system energy performance research, implementation, and international harmonization","year":2014,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Certification; Harmonization; Process (computing); Computer science; Engineering; Systems engineering","score_opus":0.04707988594072267,"score_gpt":0.3172516958618972,"score_spread":0.27017180992117457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235729757","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.094405934,0.0032091087,0.1282637,0.013582767,0.0007185211,0.0014445576,0.0012181158,0.0015100982,0.7556472],"genre_scores_gemma":[0.7463628,0.0036223829,0.11390369,0.0013851247,0.0001727268,0.0014494838,0.0038893695,0.0011378697,0.12807669],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9668141,0.007221757,0.0017153684,0.0023952506,0.019780172,0.0020733585],"domain_scores_gemma":[0.9692292,0.002152757,0.001123552,0.0049029174,0.021989686,0.000601878],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.040922105,0.0005522859,0.0005704856,0.0017718922,0.0019849355,0.00479362,0.0036184674,0.0017750105,0.013218132],"category_scores_gemma":[0.02777694,0.00029666506,0.0006718686,0.0023817194,0.0018409622,0.006379077,0.0029017807,0.0023569749,0.0028337543],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004252161,0.00082527945,0.015462368,0.0007838031,0.00005581591,0.00017549735,0.0020928173,0.022430541,0.012259031,0.28972062,0.06261593,0.59315306],"study_design_scores_gemma":[0.00011157247,0.0020531567,0.045088194,0.0011265595,0.000043750115,0.00047390134,0.0047896383,0.019302916,0.034477208,0.020683385,0.87171465,0.00013505602],"about_ca_topic_score_codex":0.03043369,"about_ca_topic_score_gemma":0.015332386,"teacher_disagreement_score":0.040922105,"about_ca_system_score_codex":0.010342667,"about_ca_system_score_gemma":0.021772364,"threshold_uncertainty_score":0.21641934},"labels":[],"label_agreement":null},{"id":"W4235972867","doi":"10.1109/wsc.1999.816807","title":"Product-based model representation for integrating 3D CAD with computer simulation","year":2003,"lang":"en","type":"article","venue":"WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"CAD; Computer Aided Design; Computer science; Representation (politics); Product design; Process (computing); Product (mathematics); Information model; Computer-aided manufacturing; Engineering design process; Solid modeling; Software engineering; Engineering drawing; Systems engineering; Building information modeling; Engineering; Artificial intelligence","score_opus":0.02925369710858671,"score_gpt":0.27043466367112967,"score_spread":0.24118096656254295,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4235972867","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.001408082,0.000049538914,0.9942689,0.000062267594,0.0000231628,0.00004054032,0.00015907167,0.0010173104,0.0029711844],"genre_scores_gemma":[0.0910297,0.00051563146,0.90201694,0.000075526485,0.000022638635,0.00036217464,0.0017095336,0.0004803785,0.0037875506],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991454,0.00026854736,0.00009416872,0.00007558101,0.00037994573,0.000036307905],"domain_scores_gemma":[0.9990086,0.000299036,0.00008742222,0.00033485144,0.00024220462,0.00002785915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013136982,0.0008891718,0.00063140556,0.0012348008,0.00032774266,0.0023927812,0.001504806,0.0011617341,0.006167571],"category_scores_gemma":[0.002940842,0.000597803,0.0014151784,0.0013236218,0.00057670433,0.0022823005,0.0014271098,0.0010621551,0.0024018725],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000115960596,0.00013109742,0.00076283945,0.00034277153,0.000074027455,0.00035575527,0.00050045527,0.4381484,0.014071902,0.3961759,0.007701089,0.14161982],"study_design_scores_gemma":[0.00002079154,0.00005257203,0.000112064496,0.000046773694,0.000038578455,0.00017811249,0.000039370538,0.917261,0.005415675,0.024996316,0.0518129,0.000025779775],"about_ca_topic_score_codex":0.0020078705,"about_ca_topic_score_gemma":0.0019577567,"teacher_disagreement_score":0.006167571,"about_ca_system_score_codex":0.0005931135,"about_ca_system_score_gemma":0.0008704218,"threshold_uncertainty_score":0.020632565},"labels":[],"label_agreement":null},{"id":"W4236037876","doi":"10.1109/wsc.2013.6721687","title":"A discrete event simulation model of asphalt paving operations","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Discrete event simulation; Computer science; Simulation modeling; Construction industry; Asphalt; Construction engineering; Systems engineering; Engineering; Simulation","score_opus":0.024427730599037304,"score_gpt":0.25422194873072623,"score_spread":0.22979421813168893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236037876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.099458426,0.00030612852,0.84915423,0.0010528334,0.00022523732,0.0003200407,0.0037547615,0.0018782511,0.043850183],"genre_scores_gemma":[0.8880535,0.0006016355,0.07624205,0.00010702624,0.000054122465,0.0006168111,0.002062185,0.00014585443,0.03211685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955934,0.00012898324,0.000035054312,0.0000904772,0.00012517902,0.00006092534],"domain_scores_gemma":[0.9993672,0.00032589096,0.00006582773,0.000060965525,0.00010952947,0.000070647104],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005700092,0.0008044166,0.0008709316,0.000807666,0.00066343235,0.0023280669,0.0019387973,0.002181507,0.009945166],"category_scores_gemma":[0.0016138862,0.00062141946,0.0010936804,0.0011257312,0.00069681276,0.0018955916,0.00090359664,0.0015145944,0.0012664861],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042781132,0.000036162324,0.00038856216,0.000015412079,0.000011284464,0.00006155632,0.000034471166,0.98648757,0.0004414915,0.010665038,0.00029978203,0.0015159931],"study_design_scores_gemma":[0.000017779521,0.0000176684,0.00010238562,0.0000038294897,0.0000065826084,0.000013749749,0.00001321699,0.99542856,0.00020758898,0.0026912105,0.0014897595,0.000007681324],"about_ca_topic_score_codex":0.024262274,"about_ca_topic_score_gemma":0.012293662,"teacher_disagreement_score":0.024262274,"about_ca_system_score_codex":0.0012807448,"about_ca_system_score_gemma":0.0023403352,"threshold_uncertainty_score":0.048242092},"labels":[],"label_agreement":null},{"id":"W4236303276","doi":"10.1088/1755-1315/491/1/011001","title":"Preface","year":2020,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Library science; State (computer science); Management; Computer science","score_opus":0.009763206059713219,"score_gpt":0.17009454990664552,"score_spread":0.1603313438469323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236303276","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016028959,0.011432822,0.005193576,0.031892877,0.10464518,0.0006300294,0.009002216,0.0018645468,0.8337359],"genre_scores_gemma":[0.006354779,0.006419271,0.0024138936,0.0057002157,0.012426821,0.00028983288,0.007069945,0.00068218866,0.9586431],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982331,0.00019004908,0.00012714228,0.00031778947,0.0009523937,0.00017958411],"domain_scores_gemma":[0.99502593,0.00046069894,0.00017785376,0.00039473127,0.0029229233,0.0010178263],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018656373,0.0011500057,0.0009802866,0.0023487546,0.0027335654,0.0052079274,0.0018608448,0.0019386839,0.555716],"category_scores_gemma":[0.008654956,0.00039596698,0.0006838161,0.002066825,0.00084182975,0.0035072712,0.0027484754,0.0033475682,0.4121599],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002737113,0.000022037704,0.00014446622,0.00013670643,0.0000022263937,0.0000609819,0.00010274501,0.000052424646,0.00014152103,0.0059433067,0.9481289,0.045237426],"study_design_scores_gemma":[0.0000029834039,0.000014271245,0.00023651478,0.00008741221,0.0000011303946,0.0000705617,0.00008874533,0.000018777258,0.00004782765,0.0012196673,0.99820864,0.0000034611953],"about_ca_topic_score_codex":0.002807577,"about_ca_topic_score_gemma":0.0032760112,"teacher_disagreement_score":0.555716,"about_ca_system_score_codex":0.0024122267,"about_ca_system_score_gemma":0.0048124217,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4236560597","doi":"10.1109/wsc.2009.5429239","title":"Meaningful Level of Change in hybrid simulation for construction analysis","year":2009,"lang":"en","type":"article","venue":"Proceedings of the 2009 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Hybrid system; Set (abstract data type); Limit (mathematics); Domain (mathematical analysis); Discrete event simulation; Event (particle physics); Industrial engineering; Construction industry; Data mining; Simulation; Machine learning; Engineering; Mathematics; Construction engineering","score_opus":0.10035144687889602,"score_gpt":0.2943295911029265,"score_spread":0.19397814422403048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236560597","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06433016,0.00013679113,0.92975277,0.0003292878,0.00004311974,0.00014460593,0.00006196205,0.0004270121,0.0047742794],"genre_scores_gemma":[0.8120601,0.00010096538,0.18666358,0.00008169505,0.000016982429,0.0002739891,0.00006762096,0.00012238059,0.0006127678],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9952192,0.0030692127,0.00018794448,0.0003156053,0.0009969514,0.00021108445],"domain_scores_gemma":[0.9863218,0.010333595,0.00074338267,0.0016539162,0.00072097173,0.00022630047],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005308785,0.00064118416,0.00074189075,0.0009303887,0.0007435601,0.0020139185,0.0011108535,0.0009983359,0.0017639886],"category_scores_gemma":[0.021510338,0.00058873446,0.0010446192,0.0009533909,0.002157733,0.0026982836,0.0027089268,0.0024966518,0.00019454768],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016053412,0.00015077982,0.0028009345,0.000082620994,0.000042165324,0.00006924506,0.0004394731,0.8632726,0.004092658,0.110047214,0.0004028665,0.018438894],"study_design_scores_gemma":[0.000016963742,0.00008090526,0.00025494717,0.000011139108,0.0000091905395,0.000011371726,0.00004666985,0.9797515,0.0015023011,0.017141698,0.001154804,0.000018532639],"about_ca_topic_score_codex":0.0037107135,"about_ca_topic_score_gemma":0.0036913322,"teacher_disagreement_score":0.005308785,"about_ca_system_score_codex":0.0019367039,"about_ca_system_score_gemma":0.0014681233,"threshold_uncertainty_score":0.028075933},"labels":[],"label_agreement":null},{"id":"W4236951425","doi":"10.1088/1757-899x/652/1/011001","title":"Preface","year":2019,"lang":"en","type":"article","venue":"IOP Conference Series Materials Science and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Political science; Engineering; Library science; Law; Computer science","score_opus":0.007874062229303962,"score_gpt":0.18468494945010255,"score_spread":0.1768108872207986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4236951425","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018147153,0.009223798,0.0058448142,0.030207718,0.1079297,0.0007535431,0.014617785,0.0023596599,0.8272483],"genre_scores_gemma":[0.007720478,0.005677978,0.0033796884,0.008406542,0.013534665,0.00043551798,0.014379731,0.0011143595,0.9453511],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99842083,0.00022487529,0.000117973796,0.00032211558,0.0007491134,0.00016513093],"domain_scores_gemma":[0.9951976,0.00067004096,0.00018144134,0.00047557653,0.0027084693,0.00076691346],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0018494389,0.0011174796,0.00087776146,0.0024519956,0.003443256,0.0051846537,0.0018883573,0.0020278522,0.5629902],"category_scores_gemma":[0.010588957,0.00037412898,0.0007335526,0.0021168261,0.0008633943,0.0041377232,0.0030089153,0.0034137603,0.40647003],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000031199044,0.000019379502,0.00012309442,0.00012166532,0.0000025077898,0.00005679582,0.00013317844,0.00004529864,0.000113832764,0.0052199634,0.9549814,0.039151724],"study_design_scores_gemma":[0.000003088542,0.0000115300645,0.00017110312,0.00008914465,0.0000012464659,0.00005802003,0.0001103052,0.000019265684,0.0000518452,0.0012961141,0.9981844,0.0000039210777],"about_ca_topic_score_codex":0.003646141,"about_ca_topic_score_gemma":0.004184417,"teacher_disagreement_score":0.4370098,"about_ca_system_score_codex":0.002280466,"about_ca_system_score_gemma":0.0037821177,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4237231591","doi":"10.11159/iccste20","title":"Proceedings of the 4th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'19)","year":2020,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Construction engineering; Computer science; Aeronautics; Civil engineering","score_opus":0.015782423134544258,"score_gpt":0.21919730837616042,"score_spread":0.20341488524161616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237231591","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02742263,0.03439759,0.27687255,0.010310646,0.08734644,0.0006095706,0.0021260253,0.0052694604,0.5556451],"genre_scores_gemma":[0.06789317,0.013228559,0.067102075,0.0012031674,0.003918554,0.00025666456,0.005253247,0.0010336797,0.84011096],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983637,0.00028322366,0.00009009112,0.00023789534,0.00081409607,0.00021100877],"domain_scores_gemma":[0.9979442,0.00018350237,0.000042772343,0.0002978157,0.00119598,0.00033574764],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0020693236,0.0011494927,0.0010997882,0.0019502058,0.0009461034,0.003012216,0.0012869445,0.001347037,0.09693951],"category_scores_gemma":[0.0018650895,0.0003072951,0.00078539044,0.0014295827,0.0007605271,0.0017467195,0.0017041733,0.0018755998,0.04952299],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019943182,0.00021710683,0.0015701614,0.00023838767,0.00005123186,0.00036213433,0.00017458621,0.0016331035,0.0066606863,0.0070835454,0.4461899,0.5356197],"study_design_scores_gemma":[0.000009373311,0.00010069794,0.0018773458,0.00013022547,0.000022075323,0.00047592883,0.00016428463,0.0057877325,0.0032538306,0.002872569,0.9852828,0.00002304903],"about_ca_topic_score_codex":0.003191204,"about_ca_topic_score_gemma":0.0066728117,"teacher_disagreement_score":0.9030605,"about_ca_system_score_codex":0.0007911922,"about_ca_system_score_gemma":0.0015522105,"threshold_uncertainty_score":0.32429492},"labels":[],"label_agreement":null},{"id":"W4237253441","doi":"10.22260/isarc2016","title":"Proceedings of the 33rd International Symposium on Automation and Robotics in Construction (ISARC)","year":2016,"lang":"en","type":"paratext","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Robotics; Automation; Artificial intelligence; Computer science; Robot; Engineering; Mechanical engineering","score_opus":0.006639652297666454,"score_gpt":0.20220904277787077,"score_spread":0.19556939048020433,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237253441","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036987517,0.113872014,0.3730736,0.0070427544,0.030564498,0.0007162769,0.0012660696,0.0067296335,0.42974755],"genre_scores_gemma":[0.18229653,0.056816276,0.19254382,0.0016766976,0.0042291614,0.0005911498,0.004377449,0.0013912128,0.5560778],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99836415,0.00043064484,0.00011486343,0.00029096263,0.0006155832,0.00018383925],"domain_scores_gemma":[0.9984505,0.00028630573,0.000057670917,0.0003258797,0.00066936994,0.00021019897],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028504531,0.00119296,0.0010903171,0.0017795094,0.00067794067,0.0040583448,0.0014023809,0.0022469042,0.058949206],"category_scores_gemma":[0.002306264,0.00038515104,0.0011587793,0.0012248323,0.0012164644,0.0017199444,0.0021112936,0.0015999387,0.03339398],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004052686,0.00031431759,0.002199672,0.00070653914,0.00015648379,0.00058799144,0.00045166526,0.004213387,0.01016339,0.009948076,0.17876832,0.7920849],"study_design_scores_gemma":[0.000034183027,0.00048096944,0.0060565537,0.00075165846,0.00015530732,0.0013896165,0.0006397954,0.0178233,0.0055896644,0.0063326573,0.9606675,0.00007879755],"about_ca_topic_score_codex":0.0041821804,"about_ca_topic_score_gemma":0.005399077,"teacher_disagreement_score":0.058949206,"about_ca_system_score_codex":0.0009321571,"about_ca_system_score_gemma":0.002067353,"threshold_uncertainty_score":0.19720471},"labels":[],"label_agreement":null},{"id":"W4237480379","doi":"10.1109/wsc.1994.717498","title":"A resource based simulation approach with application in earthmoving/strip mining","year":2005,"lang":"en","type":"article","venue":"Proceedings of Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Field (mathematics); Resource (disambiguation); Oil sands; Computer science; Construction engineering; Engineering; Systems engineering; Civil engineering; Industrial engineering; Mining engineering","score_opus":0.014747934390472107,"score_gpt":0.22188983619317618,"score_spread":0.20714190180270406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237480379","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03762534,0.00031228788,0.9414828,0.00048670053,0.000053533877,0.00011545796,0.00010926056,0.0006739683,0.019140545],"genre_scores_gemma":[0.51041,0.00095175917,0.47597578,0.00013529799,0.00004114359,0.00034450353,0.00018042252,0.0002567725,0.011704324],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996321,0.00017351122,0.000021310829,0.000040197687,0.00010114171,0.000031686286],"domain_scores_gemma":[0.99964345,0.0002008242,0.000027115871,0.000033578635,0.000053337903,0.00004162327],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005540232,0.0006071253,0.000756021,0.0006908156,0.0010800286,0.0013431554,0.0012579066,0.0016633391,0.0047261952],"category_scores_gemma":[0.0011835317,0.00055553927,0.0007863423,0.001065019,0.0010498591,0.0010156822,0.0016213738,0.0011096854,0.00055662106],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029655701,0.000041275078,0.0006713015,0.00003402855,0.000017546608,0.00020407049,0.00017569859,0.9471489,0.0012428077,0.038475357,0.00035026245,0.011609104],"study_design_scores_gemma":[0.000009724627,0.000015423917,0.000106100844,0.0000092053,0.0000064068995,0.000037530714,0.000049515795,0.9881335,0.00044001488,0.0069309175,0.004251976,0.000009584338],"about_ca_topic_score_codex":0.021652823,"about_ca_topic_score_gemma":0.017572677,"teacher_disagreement_score":0.021652823,"about_ca_system_score_codex":0.0010042833,"about_ca_system_score_gemma":0.0013579302,"threshold_uncertainty_score":0.043053567},"labels":[],"label_agreement":null},{"id":"W4237779927","doi":"10.11159/csee21","title":"Proceedings of the 6th World Congress on Civil, Structural, and Environmental Engineering","year":2021,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Science Foundation","keywords":"Computer science; Political science; Engineering ethics; Engineering","score_opus":0.004812022628021996,"score_gpt":0.1792163040976367,"score_spread":0.1744042814696147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237779927","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020222724,0.008522093,0.004030202,0.0153744435,0.045928564,0.00036310943,0.004681063,0.00048573522,0.91859263],"genre_scores_gemma":[0.0034929793,0.0031351354,0.00093079027,0.0007073124,0.0018709137,0.00013153758,0.002860087,0.00020885169,0.98666245],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99875224,0.00018842795,0.000050327944,0.00011306393,0.0007763238,0.00011966112],"domain_scores_gemma":[0.9981981,0.00021286542,0.0000684554,0.00012553205,0.0010264018,0.000368611],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0018752276,0.0011732113,0.0006812328,0.0014090355,0.0013600916,0.0065267463,0.00094661646,0.0019295602,0.27906713],"category_scores_gemma":[0.0020781416,0.00019885767,0.00041109713,0.0012112124,0.0008062922,0.0027307319,0.0023374388,0.0027792105,0.13982294],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002812765,0.000034751036,0.0001277591,0.000095693074,0.0000030194653,0.000026920905,0.000029966179,0.0001259714,0.00022763536,0.0032541512,0.95932406,0.036721963],"study_design_scores_gemma":[0.000002122027,0.000007481448,0.0003661237,0.000057374375,0.0000011435955,0.000015216868,0.000032776374,0.00008320573,0.00011077176,0.00046711255,0.9988537,0.000002954719],"about_ca_topic_score_codex":0.0044884915,"about_ca_topic_score_gemma":0.011475562,"teacher_disagreement_score":0.72093284,"about_ca_system_score_codex":0.001651835,"about_ca_system_score_gemma":0.003642424,"threshold_uncertainty_score":0.93357253},"labels":[],"label_agreement":null},{"id":"W4237870445","doi":"10.1139/l2012-096","title":"Special Issue on Construction Engineering and Management / Numéro spécial consacré à la gestion et au génie de la construction","year":2012,"lang":"fr","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Construction engineering; Civil engineering","score_opus":0.0060303010861157864,"score_gpt":0.1924436943755702,"score_spread":0.18641339328945442,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237870445","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012226684,0.04274322,0.0019930974,0.025726143,0.77761996,0.00013336158,0.00072776893,0.0002922167,0.14954159],"genre_scores_gemma":[0.005347474,0.033858355,0.0012275021,0.0054666842,0.47509766,0.00014860186,0.0011951843,0.00049543305,0.47716302],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972806,0.00026038836,0.00024015934,0.00034589256,0.00155799,0.0003149984],"domain_scores_gemma":[0.9953768,0.0008794084,0.00034492262,0.0004704955,0.001756981,0.0011713335],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002954874,0.0025964058,0.0031798996,0.006485964,0.002959377,0.007987251,0.0019326279,0.004962916,0.13878061],"category_scores_gemma":[0.004310325,0.0007276984,0.0016057732,0.003903746,0.0020183097,0.0048250463,0.0043050316,0.003391098,0.040220514],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037841837,0.000057709836,0.00028987334,0.00038283577,0.000010040226,0.0001417279,0.000045106688,0.00010247215,0.00044259525,0.0045339325,0.9519828,0.04197315],"study_design_scores_gemma":[0.000004327825,0.000021693346,0.00075391354,0.00013927722,0.0000054615944,0.00016225013,0.00003593086,0.00006824087,0.000073252486,0.0013059789,0.9974241,0.0000055745327],"about_ca_topic_score_codex":0.0032621315,"about_ca_topic_score_gemma":0.0101017,"teacher_disagreement_score":0.13878061,"about_ca_system_score_codex":0.0024198869,"about_ca_system_score_gemma":0.005431153,"threshold_uncertainty_score":0.46426737},"labels":[],"label_agreement":null},{"id":"W4237949447","doi":"10.18280/ijsdp.160420","title":"A Review on Key Performance Indicators for Measuring Real Estate Project Success","year":2021,"lang":"en","type":"review","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Real estate; Schedule; Systematic review; Performance indicator; Competence (human resources); Critical success factor; Business; Success factors; Project manager; Process management; Quality (philosophy); Project management; Computer science; Marketing; Operations management; Engineering management; Engineering; Management; Political science; Finance; Economics; Systems engineering","score_opus":0.03691884842189791,"score_gpt":0.30435272372898525,"score_spread":0.26743387530708734,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4237949447","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006117856,0.99757475,0.0003699613,0.0004257729,0.00014103533,0.00009129838,0.00014247005,0.000008647374,0.00063427445],"genre_scores_gemma":[0.0067817033,0.9913804,0.0012266588,0.00019238118,0.00005430119,0.0001314062,0.00013299956,0.0000037138964,0.00009648105],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9898645,0.0031163627,0.0028386905,0.0006070948,0.0033324936,0.00024089919],"domain_scores_gemma":[0.95652264,0.029400395,0.006135707,0.00047588872,0.007022296,0.0004429673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012028735,0.0014912048,0.0029610756,0.016653884,0.0006383036,0.0031395466,0.0016809321,0.0012978629,0.0030466705],"category_scores_gemma":[0.04139115,0.0006759021,0.003193169,0.017142393,0.0008912312,0.0035092684,0.0012559438,0.0013248407,0.0004908675],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010707075,0.00007688473,0.0024741918,0.45980173,0.0012519063,0.00010872047,0.00044320716,0.000360319,0.0003117909,0.002093167,0.0083283875,0.5246426],"study_design_scores_gemma":[0.000066331675,0.00053857965,0.019248404,0.73968214,0.011577863,0.0008911655,0.0015483986,0.000446836,0.0010208414,0.0022009325,0.22265616,0.00012239686],"about_ca_topic_score_codex":0.006446581,"about_ca_topic_score_gemma":0.014575735,"teacher_disagreement_score":0.016653884,"about_ca_system_score_codex":0.0031804997,"about_ca_system_score_gemma":0.013365199,"threshold_uncertainty_score":0.063614786},"labels":[],"label_agreement":null},{"id":"W4238377218","doi":"10.1108/pm.2002.11320bab.003","title":"Construction begins 2002 on back foot - RICS consstruction survey, fourth quarter 2001","year":2002,"lang":"en","type":"article","venue":"Property Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Foot (prosody); Geography; Art; Archaeology","score_opus":0.03208217496111675,"score_gpt":0.1984329297171701,"score_spread":0.16635075475605338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238377218","genre_codex":"dataset","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17080067,0.0009400846,0.0010761884,0.0019260357,0.00042642187,0.0003824386,0.594873,0.0008703055,0.22870481],"genre_scores_gemma":[0.11580673,0.0014994581,0.0010592185,0.00071285205,0.0000764062,0.0006574849,0.4722385,0.0002583438,0.4076911],"study_design_codex":"not_applicable","study_design_gemma":"observational","domain_scores_codex":[0.99891746,0.000072024,0.00007588079,0.000087222725,0.00057630823,0.00027105262],"domain_scores_gemma":[0.9969361,0.00027899136,0.0003598986,0.00019736074,0.0018564593,0.00037130105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007272672,0.00047698512,0.00032158766,0.005100656,0.0012839889,0.0017695936,0.0006917379,0.00068621885,0.03574134],"category_scores_gemma":[0.0027788258,0.00036635285,0.00022452339,0.0092033455,0.00024495996,0.0008044814,0.0014964439,0.0007079452,0.022421073],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001937148,0.00014288416,0.111928605,0.0002200788,0.000012992658,0.00010197224,0.0011911927,0.00032753785,0.0003115952,0.0011619664,0.8403334,0.044073984],"study_design_scores_gemma":[0.00001544254,0.00004494274,0.42892846,0.00012418666,0.00000827355,0.000041558575,0.0024437928,0.00019815714,0.00032561645,0.00009802794,0.56776017,0.000011374167],"about_ca_topic_score_codex":0.17292415,"about_ca_topic_score_gemma":0.45408228,"teacher_disagreement_score":0.17292415,"about_ca_system_score_codex":0.001845012,"about_ca_system_score_gemma":0.003854102,"threshold_uncertainty_score":0.34383523},"labels":[],"label_agreement":null},{"id":"W4238395569","doi":"10.1145/1094855.1094878","title":"Agile environments...","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Professional Engineers Ontario","funders":"","keywords":"Agile software development; Work (physics); Culture change; Organizational culture; Business; Engineering management; Computer science; Knowledge management; Operations management; Engineering; Process management; Public relations; Software engineering; Sociology; Political science","score_opus":0.004107342676813589,"score_gpt":0.16599578985404737,"score_spread":0.16188844717723377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238395569","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005601635,0.002969817,0.12065005,0.023304539,0.004725438,0.00053841504,0.0018080161,0.013921157,0.8264809],"genre_scores_gemma":[0.061085783,0.0048896493,0.1351197,0.012163936,0.0008663465,0.0008708794,0.002470336,0.0044332584,0.77810013],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979911,0.00077329867,0.000104333514,0.00017987372,0.000704697,0.00024676355],"domain_scores_gemma":[0.9973641,0.00046699276,0.00017988076,0.0005625846,0.000615921,0.0008105825],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026920713,0.0007099102,0.00023071561,0.00069192884,0.001715984,0.00473396,0.0009642255,0.0011677069,0.1082775],"category_scores_gemma":[0.0045309965,0.00042994044,0.00043653077,0.00074255455,0.00066166907,0.0038623728,0.0051557086,0.0023981358,0.088862054],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032889184,0.000093677365,0.0011206674,0.00020909036,0.000014365384,0.0001741835,0.002756011,0.0002835138,0.0012810885,0.044481628,0.5700807,0.3794723],"study_design_scores_gemma":[0.000006360665,0.000016440352,0.00027860102,0.00006375,0.0000018005526,0.00014570144,0.00039352657,0.00010281484,0.00015042546,0.0032028959,0.9956286,0.000009062944],"about_ca_topic_score_codex":0.0012598225,"about_ca_topic_score_gemma":0.0030101188,"teacher_disagreement_score":0.1082775,"about_ca_system_score_codex":0.0004449121,"about_ca_system_score_gemma":0.0016873257,"threshold_uncertainty_score":0.36222434},"labels":[],"label_agreement":null},{"id":"W4238980485","doi":"10.1109/wsc.1995.478892","title":"Applications of simulation in progress reporting and control","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference Proceedings, 1995.","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Control (management); Discrete event simulation; Resource (disambiguation); Data modeling; Software engineering; Systems engineering; Simulation; Engineering","score_opus":0.016018663581950577,"score_gpt":0.26920748382419774,"score_spread":0.25318882024224715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4238980485","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015787847,0.0008785396,0.9761478,0.0005087944,0.0002001027,0.00008087371,0.00006858669,0.0011154938,0.019421162],"genre_scores_gemma":[0.24354357,0.006392465,0.72768027,0.0007906358,0.00042646154,0.0006805545,0.0006327699,0.0007495833,0.019103764],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958528,0.0017645177,0.00035963205,0.0004126132,0.0014174148,0.00019300081],"domain_scores_gemma":[0.9937023,0.0039637536,0.00036722037,0.0008972596,0.00090861745,0.00016090553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004240802,0.0012536956,0.00085811364,0.0018880194,0.0008897374,0.0034572228,0.0017426552,0.0017528741,0.00765316],"category_scores_gemma":[0.008378555,0.00081498927,0.0011213281,0.0021147141,0.0019081307,0.0025197803,0.0019357052,0.0015796437,0.00192929],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008696296,0.00008188532,0.0016652491,0.00023099317,0.00008518658,0.00031091843,0.00056808983,0.34171855,0.002036882,0.49217048,0.0056822747,0.15536243],"study_design_scores_gemma":[0.0000469213,0.00009826506,0.0003138918,0.00020846841,0.00006013139,0.00031175162,0.00012154962,0.6344144,0.004636747,0.14919995,0.21051018,0.00007780904],"about_ca_topic_score_codex":0.0077287666,"about_ca_topic_score_gemma":0.0045326576,"teacher_disagreement_score":0.0077287666,"about_ca_system_score_codex":0.001992064,"about_ca_system_score_gemma":0.0023157056,"threshold_uncertainty_score":0.02560234},"labels":[],"label_agreement":null},{"id":"W4239115533","doi":"10.1109/wsc.2014.7020173","title":"BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication","year":2014,"lang":"en","type":"article","venue":"Proceedings of the Winter Simulation Conference 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Fabrication; Resource (disambiguation); Computer science; Plan (archaeology); Control (management); Job shop; Engineering; Manufacturing engineering; Job shop scheduling; Flow shop scheduling; Embedded system","score_opus":0.0475459947325544,"score_gpt":0.2793401753914601,"score_spread":0.23179418065890572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4239115533","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.36020768,0.00026991917,0.62730545,0.00038754157,0.000046584933,0.00040848507,0.00435382,0.002451135,0.004569342],"genre_scores_gemma":[0.7207835,0.00023221727,0.27276286,0.000043950058,0.000016440346,0.0004396681,0.004449363,0.00008739113,0.0011846288],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99907887,0.0002572664,0.00008953513,0.00017105616,0.00031372282,0.000089566485],"domain_scores_gemma":[0.9982436,0.0008680034,0.00018231718,0.0001828692,0.0004451112,0.0000782064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014025858,0.00093616557,0.0011112833,0.0037002622,0.000688719,0.0011133772,0.0015769821,0.00092164165,0.0011672532],"category_scores_gemma":[0.0043336228,0.0008340239,0.0010978004,0.0044752494,0.00033246417,0.0010410978,0.00093935884,0.0008136472,0.00059528474],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022306074,0.0008526204,0.026494816,0.00021240722,0.00011141625,0.00019098201,0.00030687737,0.8591693,0.0028377525,0.0020104963,0.0018203474,0.10576993],"study_design_scores_gemma":[0.0000052495147,0.00003162848,0.0038442393,0.0000074296463,0.0000087425815,0.000023470177,0.00014133434,0.99338406,0.0012743545,0.0006756988,0.0005912451,0.00001257938],"about_ca_topic_score_codex":0.019197129,"about_ca_topic_score_gemma":0.02671493,"teacher_disagreement_score":0.019197129,"about_ca_system_score_codex":0.0012018374,"about_ca_system_score_gemma":0.0017217973,"threshold_uncertainty_score":0.038170815},"labels":[],"label_agreement":null},{"id":"W4240105298","doi":"10.1109/ihtc.2017.8058164","title":"The 3rd IEEE Canada International Humanitarian Technology Conference (IHTC 2017) Student Design Competition","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Competition (biology); Computer science; Engineering; Aeronautics","score_opus":0.021533904899765012,"score_gpt":0.23534785063206493,"score_spread":0.21381394573229992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240105298","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05716262,0.0014523228,0.027704425,0.03364212,0.029220112,0.000844361,0.0054515707,0.002253519,0.84226894],"genre_scores_gemma":[0.068122044,0.0005855085,0.005187476,0.0014950469,0.0006030279,0.0002562035,0.004546999,0.00066735037,0.91853637],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972946,0.00025041847,0.000039134993,0.00017762255,0.0015292475,0.00070898357],"domain_scores_gemma":[0.9945686,0.00012584218,0.00003367976,0.00014651296,0.002301998,0.0028234043],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00506979,0.0014491922,0.0011074139,0.0013669495,0.0065947087,0.008665657,0.0020625778,0.00301142,0.11938705],"category_scores_gemma":[0.0022164222,0.0005056464,0.0009737757,0.00096321275,0.002097521,0.0012681289,0.004016303,0.0032484222,0.03571414],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002826522,0.0005742345,0.0015101252,0.00009146659,0.000023450006,0.00009723975,0.00048684835,0.002486923,0.0022346433,0.010435462,0.9196166,0.06216039],"study_design_scores_gemma":[0.00005805453,0.00020434553,0.0027877805,0.00006349599,0.000010978243,0.000035973557,0.0013034247,0.0036886332,0.002067606,0.004375392,0.98535943,0.00004488413],"about_ca_topic_score_codex":0.15809305,"about_ca_topic_score_gemma":0.5342669,"teacher_disagreement_score":0.15809305,"about_ca_system_score_codex":0.012610507,"about_ca_system_score_gemma":0.03208718,"threshold_uncertainty_score":0.3993895},"labels":[],"label_agreement":null},{"id":"W4240200891","doi":"10.2172/822911","title":"ESTABLISHMENT OF AN ENVIRONMENTAL CONTROL TECHNOLOGY LABORATORY WITH A CIRCULATING FLUIDIZED-BED COMBUSTION SYSTEM","year":2004,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Combustion; Quarter (Canadian coin); Fluidized bed combustion; Engineering; Waste management; Work (physics); Fluidized bed; Environmental science; Mechanical engineering","score_opus":0.00436543696027485,"score_gpt":0.18344140084284233,"score_spread":0.17907596388256747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4240200891","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31661108,0.0012176138,0.60731846,0.0014301058,0.0007343113,0.0050076325,0.0015066268,0.012612046,0.053562205],"genre_scores_gemma":[0.36679193,0.00041736662,0.5956509,0.00029616334,0.0001313464,0.0015974005,0.0031474126,0.00028272235,0.031684764],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9952407,0.00060733606,0.00025274267,0.00044393266,0.0029857217,0.00046955489],"domain_scores_gemma":[0.9968315,0.00028121384,0.00014866928,0.0003492236,0.0018977618,0.00049170025],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00650438,0.000495326,0.0006575882,0.0012746122,0.0013060533,0.0021825389,0.0019936545,0.00068161887,0.005473574],"category_scores_gemma":[0.0023694457,0.0003778837,0.0003587038,0.0007120215,0.00078166917,0.001603202,0.0014216162,0.0016206508,0.00207864],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011544611,0.004577049,0.01655161,0.0006788659,0.000050422834,0.0006050732,0.0013917844,0.020306082,0.42914844,0.03426257,0.022241522,0.46903214],"study_design_scores_gemma":[0.0005923658,0.0031772817,0.010770169,0.00013455036,0.00007670748,0.0008958333,0.000646534,0.05343138,0.62839407,0.0013433509,0.3003501,0.00018762812],"about_ca_topic_score_codex":0.008760117,"about_ca_topic_score_gemma":0.006558801,"teacher_disagreement_score":0.008760117,"about_ca_system_score_codex":0.0024057443,"about_ca_system_score_gemma":0.012260622,"threshold_uncertainty_score":0.034398913},"labels":[],"label_agreement":null},{"id":"W4241079325","doi":"10.1109/wsc.2016.7822358","title":"Modular construction system simulation incorporating off-shore fabrication and multi-mode transportation","year":2016,"lang":"en","type":"article","venue":"2016 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"University of Alberta; Suncor Energy Incorporated","keywords":"Modular design; Fabrication; Computer science; Shore; Modular construction; Mode (computer interface); Systems engineering; Marine engineering; Embedded system; Engineering; Operating system; Geology","score_opus":0.019399747818048093,"score_gpt":0.24343292996326366,"score_spread":0.22403318214521556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241079325","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8700907,0.00009465898,0.08749563,0.00023493968,0.00007920376,0.00021744662,0.0015670968,0.00075143424,0.03946881],"genre_scores_gemma":[0.98142046,0.00007706357,0.01336191,0.00002437477,0.0000049624873,0.00021102262,0.0004649689,0.000044308188,0.0043909852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978775,0.000060790033,0.000010137742,0.000030567873,0.000041429033,0.00006931577],"domain_scores_gemma":[0.99935883,0.00036252133,0.000054826593,0.000049956758,0.000104772844,0.000069222624],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047775044,0.0006313779,0.0006966999,0.0006658346,0.00061395386,0.00092748617,0.001148658,0.0014783604,0.006926324],"category_scores_gemma":[0.0010637692,0.00034087835,0.0009867037,0.0007726321,0.0006039773,0.0005514564,0.0009949052,0.0006918019,0.0004314546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023377734,0.000026248346,0.00059701124,0.000010659386,0.000005232969,0.000038471426,0.000028707263,0.9973327,0.00030188463,0.000843114,0.000091071975,0.0007014832],"study_design_scores_gemma":[0.000009733835,0.000020862759,0.00021179269,0.000002076168,0.0000031906748,0.0000057510797,0.000023725797,0.9990841,0.0001811165,0.00022883111,0.00022580072,0.0000029556318],"about_ca_topic_score_codex":0.019554669,"about_ca_topic_score_gemma":0.012484795,"teacher_disagreement_score":0.019554669,"about_ca_system_score_codex":0.0009530358,"about_ca_system_score_gemma":0.0014991502,"threshold_uncertainty_score":0.03888172},"labels":[],"label_agreement":null},{"id":"W4241686141","doi":"10.1109/acsos-c52956.2021.00017","title":"4th International Workshop on Self-Organized Construction (SOCO 2021) [Organizing Committee and Program Committee]","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Engineering management; Operations research; Computer science; Library science; Political science; Engineering","score_opus":0.007985454107059177,"score_gpt":0.2238736060543729,"score_spread":0.21588815194731373,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4241686141","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026584648,0.042689353,0.31087393,0.05485885,0.07495366,0.0027479355,0.011232541,0.005959746,0.47009936],"genre_scores_gemma":[0.10074701,0.027130893,0.17627062,0.0057439785,0.006205242,0.0024270085,0.04455215,0.0030408006,0.6338822],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99687374,0.0008054944,0.00013013255,0.00034634734,0.0012181954,0.0006261195],"domain_scores_gemma":[0.99590427,0.0004312931,0.00011412163,0.0004185376,0.0018977133,0.0012340473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008129964,0.001293235,0.0009932176,0.0021503486,0.0015629833,0.005194927,0.0021502217,0.002851254,0.045988105],"category_scores_gemma":[0.0032752112,0.0005396509,0.0010021753,0.0019361132,0.0010446471,0.002836665,0.005594295,0.0021233258,0.017995505],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039995357,0.00036403493,0.0013201956,0.0006529203,0.000031758704,0.00009246652,0.00037514427,0.0028109122,0.003560733,0.028535647,0.59870106,0.3631551],"study_design_scores_gemma":[0.0000225183,0.0000918633,0.0013617363,0.00035980038,0.000017453658,0.000076640485,0.00021810117,0.0024304984,0.0019806724,0.00527591,0.9881462,0.000018558321],"about_ca_topic_score_codex":0.009188595,"about_ca_topic_score_gemma":0.015776422,"teacher_disagreement_score":0.045988105,"about_ca_system_score_codex":0.0023549083,"about_ca_system_score_gemma":0.009444003,"threshold_uncertainty_score":0.15384555},"labels":[],"label_agreement":null},{"id":"W4242219550","doi":"10.1109/wsc.2013.6721681","title":"Development of a distributed construction project management game with COTS in the loop","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Loop (graph theory); Project management; Systems engineering; Engineering management; Process management; Software engineering; Engineering","score_opus":0.018801080195292356,"score_gpt":0.22456493363907987,"score_spread":0.2057638534437875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242219550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11672695,0.00009469947,0.83784837,0.0003264648,0.0001832582,0.0039151185,0.00040005747,0.007983497,0.032521605],"genre_scores_gemma":[0.23048206,0.0001234288,0.75426143,0.00009600652,0.0000109944285,0.002043187,0.00045313284,0.00037360744,0.012156234],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994622,0.00015005546,0.000045173954,0.000080081416,0.00019948817,0.000063120395],"domain_scores_gemma":[0.9992151,0.0002788941,0.00003058739,0.00008440997,0.00021985256,0.00017099778],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001160931,0.00092819246,0.0006020982,0.0005773594,0.00038734946,0.00094481255,0.0018854998,0.00076967577,0.006568853],"category_scores_gemma":[0.0023735825,0.00056877994,0.0005442605,0.00021709148,0.0004534383,0.0009767909,0.0015709334,0.00093388394,0.00094555825],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019906282,0.0061510457,0.0099118315,0.001926656,0.00024335616,0.0025360063,0.0072753234,0.24769753,0.15814465,0.08030275,0.02271937,0.46110088],"study_design_scores_gemma":[0.000801715,0.002237384,0.0049627814,0.0003112952,0.00011812616,0.0010452366,0.00064643,0.825646,0.039228324,0.007218949,0.1176161,0.00016765688],"about_ca_topic_score_codex":0.0030947367,"about_ca_topic_score_gemma":0.0028717932,"teacher_disagreement_score":0.006568853,"about_ca_system_score_codex":0.0006446599,"about_ca_system_score_gemma":0.0013356043,"threshold_uncertainty_score":0.02197498},"labels":[],"label_agreement":null},{"id":"W4242441237","doi":"10.1017/s0890060415000347","title":"AIE volume 29 issue 3 Cover and Front matter","year":2015,"lang":"en","type":"article","venue":"Artificial intelligence for engineering design analysis and manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of South Australia; George Mason University; Massachusetts Institute of Technology; Oregon State University; University of Toronto; Carnegie Mellon University; University College London; Drexel University; Boeing; Worcester Polytechnic Institute; Aalborg Universitet; Technische Universiteit Delft; Georgia Institute of Technology","keywords":"Cover (algebra); Scope (computer science); Front cover; Volume (thermodynamics); Computer science; Section (typography); Data science; Engineering; Artificial intelligence; Mechanical engineering","score_opus":0.023653263553407203,"score_gpt":0.2268657068199228,"score_spread":0.2032124432665156,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4242441237","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014367539,0.0029112503,0.0018183087,0.0056764437,0.0126461005,0.000100450496,0.0011096117,0.0013455556,0.9729556],"genre_scores_gemma":[0.003743392,0.0013709731,0.00085613044,0.00096983375,0.00135342,0.000023651066,0.00075446354,0.0002567751,0.9906713],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99907494,0.00005737116,0.00003356607,0.000114592556,0.00062201166,0.00009743298],"domain_scores_gemma":[0.99796,0.00021965221,0.000049917857,0.00024669446,0.0010861919,0.00043756815],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0011316404,0.00075107336,0.00068817905,0.0023259383,0.0013202872,0.006117177,0.00087172526,0.0022210565,0.7220856],"category_scores_gemma":[0.0022188195,0.00032875474,0.00057869044,0.0013771147,0.0007752924,0.002029591,0.0018641887,0.0018446258,0.6110955],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053929536,0.00011039881,0.0003302296,0.00018352144,0.000010753369,0.00010239622,0.00003661947,0.00015842279,0.0015277056,0.0029786697,0.8688093,0.12569806],"study_design_scores_gemma":[0.000004475887,0.000011854248,0.00056626886,0.000079902384,0.0000029893963,0.00007999052,0.000041698317,0.0001553466,0.00037644393,0.0005795626,0.99809724,0.000004320487],"about_ca_topic_score_codex":0.0019063144,"about_ca_topic_score_gemma":0.004163145,"teacher_disagreement_score":0.2779144,"about_ca_system_score_codex":0.0011726661,"about_ca_system_score_gemma":0.001678733,"threshold_uncertainty_score":0.39641112},"labels":[],"label_agreement":null},{"id":"W4243031019","doi":"10.26868/25222708.2019.210271","title":"Building Performance Optimization for Operational Rule Extraction","year":2020,"lang":"en","type":"article","venue":"Building Simulation Conference proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"National Research Council Canada; Concordia University; Carleton University","funders":"National Research Council Canada; Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Extraction (chemistry); Chromatography","score_opus":0.027662943291474465,"score_gpt":0.26505123461328256,"score_spread":0.2373882913218081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243031019","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06682,0.0002794797,0.92517173,0.00013584856,0.000020764144,0.0002323181,0.0005086823,0.0006511819,0.0061799306],"genre_scores_gemma":[0.6542307,0.00024436705,0.34276977,0.000053375865,0.00001788688,0.0003649802,0.0011161553,0.00007873245,0.001124007],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991217,0.00033185064,0.000057549973,0.00012179402,0.00026542076,0.00010179601],"domain_scores_gemma":[0.9975339,0.001911286,0.00012920008,0.000088930195,0.00030681634,0.000029854376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014449533,0.0012037216,0.0010954875,0.0013620341,0.00046585518,0.0011868536,0.00083638437,0.00073578843,0.0023452512],"category_scores_gemma":[0.0062140324,0.00051592593,0.0011572316,0.0014077721,0.0004186656,0.00076162483,0.0004851098,0.0010546794,0.00045099325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029285196,0.000053607895,0.0006840315,0.00006465595,0.000025433812,0.000052711697,0.000030855703,0.9559396,0.0010930396,0.0016299246,0.00033024175,0.040066574],"study_design_scores_gemma":[0.000004890585,0.00001919938,0.00019467543,0.0000115946805,0.00001228752,0.000010543001,0.0000147019455,0.997503,0.00080824975,0.0011452175,0.00027152846,0.0000041397657],"about_ca_topic_score_codex":0.012815307,"about_ca_topic_score_gemma":0.010033676,"teacher_disagreement_score":0.012815307,"about_ca_system_score_codex":0.0010718013,"about_ca_system_score_gemma":0.0018441806,"threshold_uncertainty_score":0.025481403},"labels":[],"label_agreement":null},{"id":"W4243299942","doi":"10.1109/wsc.2005.1574417","title":"Modeling Scheduling Uncertainty in Capital Construction Projects","year":2006,"lang":"en","type":"article","venue":"Proceedings of the Winter Simulation Conference, 2005.","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources; University of Alberta","funders":"","keywords":"Computer science; Scheduling (production processes); Monte Carlo method; Work (physics); Inflation (cosmology); Cost accounting; Operations research; Industrial engineering; Engineering; Economics; Operations management; Accounting","score_opus":0.014370303414607634,"score_gpt":0.2167913146356863,"score_spread":0.20242101122107867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4243299942","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.49894276,0.00049660093,0.4859915,0.0006562163,0.000066547924,0.00010777418,0.00077190873,0.00032864677,0.012637934],"genre_scores_gemma":[0.99023634,0.00016116173,0.008202272,0.000016374282,0.000016506312,0.00004761002,0.00016436153,0.000027494088,0.0011279146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989893,0.00046660777,0.000050541974,0.00014822042,0.00016398198,0.00018141876],"domain_scores_gemma":[0.9965592,0.0024342334,0.00048311488,0.000119834476,0.000207352,0.00019630682],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022434474,0.0006426359,0.0007667278,0.0007561129,0.0005069214,0.0017877844,0.0010349132,0.0011853747,0.0017001551],"category_scores_gemma":[0.008007784,0.0007324078,0.00068753364,0.0012548137,0.0006548648,0.0012897587,0.0007906672,0.00085437944,0.00016747523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011190938,0.000004401479,0.0002855858,0.000002607586,0.0000034819363,0.000010174481,0.000010998919,0.99747473,0.000029535891,0.0015742152,0.00003427119,0.0005589069],"study_design_scores_gemma":[0.0000038729268,0.000007854259,0.00016909323,0.0000022284892,0.000003629112,0.0000037595373,0.000009227076,0.99729544,0.000042589178,0.0023393992,0.00011962739,0.0000033778852],"about_ca_topic_score_codex":0.027057607,"about_ca_topic_score_gemma":0.014072053,"teacher_disagreement_score":0.027057607,"about_ca_system_score_codex":0.0026069556,"about_ca_system_score_gemma":0.0018917207,"threshold_uncertainty_score":0.053800225},"labels":[],"label_agreement":null},{"id":"W4244288987","doi":"10.1109/wsc.2012.6465326","title":"Effective strategies for simulating one-of-a-kind construction projects","year":2012,"lang":"en","type":"article","venue":"Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cumulative Environmental Management Association; University of Alberta","funders":"","keywords":"Computer science; Process (computing); Global Positioning System; Domain (mathematical analysis); Discrete event simulation; Systems engineering; Proof of concept; Event (particle physics); Software engineering; Product (mathematics); Simulation; Engineering","score_opus":0.028083989578565244,"score_gpt":0.2567512608775631,"score_spread":0.22866727129899786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244288987","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.088303834,0.00009819188,0.8931543,0.00015141873,0.000027009079,0.00044405824,0.00023225875,0.0013035925,0.016285345],"genre_scores_gemma":[0.55442035,0.0002644885,0.4406856,0.000034778644,0.000004870509,0.0008422756,0.00024782005,0.00015973982,0.0033400112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995834,0.00019922946,0.000027108374,0.00003756754,0.00012073362,0.000031971154],"domain_scores_gemma":[0.9994166,0.00030918856,0.000054843043,0.00011164532,0.00007119181,0.00003658578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008262513,0.0006171186,0.00054720906,0.0007061084,0.00052765897,0.0009714567,0.001291655,0.00087688904,0.0039964938],"category_scores_gemma":[0.0019224681,0.00049271487,0.00056878163,0.0006684956,0.00056313135,0.0010164954,0.0009625348,0.0005223841,0.0005470057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005117535,0.00008441832,0.0017351042,0.0000783888,0.000022766215,0.00008324946,0.0002644487,0.9545802,0.0029007513,0.01676231,0.00047028545,0.022966994],"study_design_scores_gemma":[0.000031345495,0.00006692717,0.0002593408,0.000020019263,0.000016387996,0.000041645093,0.00013574389,0.9866909,0.0027407736,0.0058370666,0.004144974,0.000014867068],"about_ca_topic_score_codex":0.004946148,"about_ca_topic_score_gemma":0.007344485,"teacher_disagreement_score":0.004946148,"about_ca_system_score_codex":0.00082216033,"about_ca_system_score_gemma":0.0010130237,"threshold_uncertainty_score":0.01336962},"labels":[],"label_agreement":null},{"id":"W4244707463","doi":"10.32920/ryerson.14665020.v1","title":"Climate Change Impact on Design and Building Criteria of Infrastructure Assets - Simulation Model","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; Western University","funders":"","keywords":"Climate change; Investment (military); Asset (computer security); Contingency plan; Simulation modeling; Computer science; Contingency; Control (management); Environmental resource management; Environmental science; Environmental economics; Operations research; Business; Risk analysis (engineering); Economics; Engineering; Microeconomics","score_opus":0.03574128903893163,"score_gpt":0.30658048957534156,"score_spread":0.2708392005364099,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4244707463","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8572205,0.00018729913,0.090220176,0.00025612916,0.000047407248,0.00022479368,0.0020097857,0.00033884068,0.04949507],"genre_scores_gemma":[0.98544717,0.000112892005,0.008664568,0.000020051868,0.0000056104514,0.0001417883,0.0004348052,0.000030847892,0.0051423134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977404,0.00007497636,0.000010748407,0.000033450437,0.00004774681,0.000059072678],"domain_scores_gemma":[0.9994394,0.00031222485,0.00006105652,0.00004364657,0.00011146403,0.00003213472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00048162398,0.0004883715,0.0005074941,0.0006072159,0.0003928143,0.000761561,0.0007872191,0.0010213421,0.0046492545],"category_scores_gemma":[0.0010847698,0.00031688283,0.000901552,0.00062208314,0.000453539,0.00054395787,0.0004518375,0.00053784845,0.00038593647],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014374162,0.00001589781,0.00051674765,0.000007220714,0.00000351623,0.000015931655,0.000007588056,0.9979304,0.00028958084,0.00067930634,0.000050860275,0.00046853456],"study_design_scores_gemma":[0.000010008568,0.000020885487,0.00047236256,0.0000029280693,0.000005330938,0.000009583663,0.000011744647,0.9983323,0.00040259806,0.00036255067,0.000364555,0.0000052078053],"about_ca_topic_score_codex":0.023390107,"about_ca_topic_score_gemma":0.010751912,"teacher_disagreement_score":0.023390107,"about_ca_system_score_codex":0.0010373964,"about_ca_system_score_gemma":0.0009979003,"threshold_uncertainty_score":0.046507955},"labels":[],"label_agreement":null},{"id":"W4245145790","doi":"10.1139/cjce-2019-0682","title":"Lean and BIM meet social sciences: new perspectives in construction engineering and management","year":2020,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Engineering; Lean construction; Construction engineering; Building information modeling; Engineering management; Architectural engineering; Construction industry; Operations management","score_opus":0.012621540946423298,"score_gpt":0.18514717013220397,"score_spread":0.17252562918578068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245145790","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021279994,0.21377988,0.19240054,0.3792799,0.00480348,0.00006692111,0.00028141207,0.0002345691,0.18787335],"genre_scores_gemma":[0.7445164,0.115720734,0.08988367,0.022683121,0.011356209,0.00026312278,0.00018061412,0.00026733289,0.015128799],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9901888,0.005876764,0.00032764862,0.00055441324,0.0024718128,0.00058046536],"domain_scores_gemma":[0.97337884,0.021267805,0.0009803878,0.00083280005,0.002168683,0.0013714898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016735584,0.0013807353,0.0017415879,0.0076114684,0.004829937,0.019153733,0.002196607,0.006792116,0.007891947],"category_scores_gemma":[0.012172887,0.0008796498,0.0008566664,0.008857727,0.05567572,0.023939634,0.0074744695,0.00690139,0.0006143329],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021235935,0.000043356184,0.0005966109,0.00020310377,0.00001783607,0.000081936305,0.003831452,0.0007076205,0.00008390609,0.95952994,0.0045654336,0.030317653],"study_design_scores_gemma":[0.0000151426175,0.000025084473,0.0008895513,0.00042242403,0.0000117418085,0.00009557459,0.0070984215,0.0015961026,0.00010076251,0.91934687,0.07035989,0.00003840478],"about_ca_topic_score_codex":0.029405357,"about_ca_topic_score_gemma":0.05589831,"teacher_disagreement_score":0.029405357,"about_ca_system_score_codex":0.013482653,"about_ca_system_score_gemma":0.017160641,"threshold_uncertainty_score":0.09782398},"labels":[],"label_agreement":null},{"id":"W4245837393","doi":"10.32920/ryerson.14656428","title":"The development of a geo-referencing system for machine controlled construction equipment","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Excavator; Real-time computing; Kinematics; Position (finance); Systems engineering; Engineering; Mechanical engineering","score_opus":0.01454661700909382,"score_gpt":0.2191094785004344,"score_spread":0.2045628614913406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245837393","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017292148,0.0002151627,0.9714224,0.000108984575,0.00015636023,0.0002775949,0.00012028271,0.0034744912,0.0069325306],"genre_scores_gemma":[0.31672248,0.00046155622,0.66436225,0.0001411701,0.000085568965,0.00038832752,0.0006512283,0.00020363009,0.01698378],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991986,0.000080460464,0.000038778042,0.00016984671,0.00045480178,0.000057434212],"domain_scores_gemma":[0.9994241,0.000069491725,0.000049941824,0.00011779483,0.00030726817,0.00003147287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084770017,0.0004674815,0.00048175166,0.0006192514,0.000378214,0.0008932703,0.0012488985,0.00092493487,0.0025607857],"category_scores_gemma":[0.0008618175,0.00033194255,0.00038575917,0.00049559237,0.00043099688,0.0009732234,0.0007654192,0.0008962823,0.00213646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028190968,0.00015742512,0.0033650566,0.0004841023,0.000053051564,0.0004680153,0.00071483105,0.036217395,0.33469132,0.038504664,0.007842951,0.57721925],"study_design_scores_gemma":[0.000113666596,0.0013401215,0.0072247153,0.00019317387,0.00010479169,0.001026405,0.00016493282,0.31625852,0.3721854,0.004061222,0.29716456,0.00016251311],"about_ca_topic_score_codex":0.0012278442,"about_ca_topic_score_gemma":0.00090835686,"teacher_disagreement_score":0.0025607857,"about_ca_system_score_codex":0.0005373173,"about_ca_system_score_gemma":0.0010870964,"threshold_uncertainty_score":0.008566737},"labels":[],"label_agreement":null},{"id":"W4245880842","doi":"10.32920/ryerson.14654898","title":"The Use of Aerogel-Enhanced Blanket for Thermal Bridging Correction in Concrete and Steel Buildings","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Blanket; Aerogel; Thermal; Bridging (networking); Roof; Structural engineering; Materials science; Civil engineering; Environmental science; Architectural engineering; Computer science; Mechanical engineering; Composite material; Engineering","score_opus":0.018379961113977418,"score_gpt":0.21968138277461793,"score_spread":0.20130142166064052,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4245880842","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8921705,0.00067018473,0.099843875,0.000057560883,0.00005517925,0.000025995894,0.00014624889,0.0004007252,0.0066297404],"genre_scores_gemma":[0.9818796,0.00018447904,0.01632414,0.000007826802,0.0000020965304,0.000008375356,0.000056435372,0.000039678474,0.0014973965],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99983394,0.00002760844,0.0000064884166,0.000028189048,0.000084605585,0.000019219942],"domain_scores_gemma":[0.99987483,0.000043914857,0.000020225923,0.000026646912,0.000026707643,0.000007688046],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002735946,0.00032237777,0.00022749692,0.0003736597,0.00014234429,0.00043399291,0.00032590807,0.00038647585,0.00089547905],"category_scores_gemma":[0.0004582225,0.00015667849,0.000350963,0.0003372798,0.00020345548,0.000680844,0.0003723165,0.00021529071,0.00014140287],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003876539,0.00013998753,0.003948589,0.00048070314,0.000050896426,0.000490723,0.00021001686,0.33455774,0.573219,0.003982783,0.00047479567,0.08205719],"study_design_scores_gemma":[0.000023064831,0.0005290371,0.006853506,0.000047173562,0.000075180535,0.0003445742,0.00017073071,0.31784248,0.6638154,0.0011266997,0.009112357,0.000059865335],"about_ca_topic_score_codex":0.0006263413,"about_ca_topic_score_gemma":0.0015943721,"teacher_disagreement_score":0.00089547905,"about_ca_system_score_codex":0.00021099388,"about_ca_system_score_gemma":0.0001546955,"threshold_uncertainty_score":0.0029956698},"labels":[],"label_agreement":null},{"id":"W4246061618","doi":"10.22260/isarc2019/0014","title":"Automatic Generation of the Vertical Transportation Demands During the Construction of High-Rise Buildings Using BIM","year":2019,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Transport engineering; Schedule; Elevator; Process (computing); Construction management; Engineering; Computer science; Construction engineering; Civil engineering; Scheduling (production processes); Operations management","score_opus":0.007704802908658045,"score_gpt":0.18836402889479292,"score_spread":0.18065922598613487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246061618","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07292869,0.00014173597,0.9102248,0.00009924497,0.00005716556,0.00027700872,0.0015520994,0.009458703,0.0052606114],"genre_scores_gemma":[0.44896793,0.00021713297,0.5421186,0.0000392113,0.000028815979,0.00028674977,0.005942336,0.0008959841,0.0015032467],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99913776,0.00014143977,0.00004441437,0.00013079918,0.0004609482,0.000084598774],"domain_scores_gemma":[0.99910295,0.00021416864,0.00012373092,0.0001548437,0.00029996948,0.00010434979],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008848141,0.0017469017,0.00096182624,0.0031721354,0.0006045443,0.0012858963,0.0011170284,0.00074503967,0.002681126],"category_scores_gemma":[0.0016430739,0.0009823228,0.001239591,0.002071979,0.000312009,0.0010502146,0.0016040449,0.0008210111,0.002040742],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007087514,0.00054827164,0.019960143,0.0006208343,0.00016417574,0.0010291511,0.001651863,0.3449649,0.09665578,0.0042733825,0.010886366,0.5185364],"study_design_scores_gemma":[0.000034198907,0.000090556445,0.010370419,0.000050195074,0.000040281637,0.00013642329,0.00038378165,0.95851415,0.021644264,0.0029256956,0.00575192,0.00005807087],"about_ca_topic_score_codex":0.00336265,"about_ca_topic_score_gemma":0.0048923464,"teacher_disagreement_score":0.00336265,"about_ca_system_score_codex":0.0004717096,"about_ca_system_score_gemma":0.001068458,"threshold_uncertainty_score":0.008969307},"labels":[],"label_agreement":null},{"id":"W4246413105","doi":"10.1017/s0890060414000717","title":"AIE volume 29 issue 1 Cover and Front matter","year":2015,"lang":"en","type":"article","venue":"Artificial intelligence for engineering design analysis and manufacturing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"University of South Australia; University of Cambridge; George Mason University; Massachusetts Institute of Technology; Oregon State University; University of Toronto; Carnegie Mellon University; University College London; Drexel University; Boeing; Worcester Polytechnic Institute; Aalborg Universitet; Technische Universiteit Delft; Georgia Institute of Technology","keywords":"Front cover; Volume (thermodynamics); Cover (algebra); Front (military); Environmental science; Physics; Geology; Engineering; Oceanography; Mechanical engineering; Thermodynamics","score_opus":0.02401772130387798,"score_gpt":0.22715617341201194,"score_spread":0.20313845210813397,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246413105","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015086534,0.0040747654,0.0017895537,0.006445899,0.0151236495,0.000114053626,0.0011797505,0.0012534796,0.9685102],"genre_scores_gemma":[0.0038007891,0.0018741818,0.0009080115,0.0010623641,0.0017406254,0.00002631945,0.0008827173,0.00025563303,0.9894493],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99894077,0.00007092526,0.000039681334,0.00012742987,0.00071281026,0.000108457134],"domain_scores_gemma":[0.997712,0.00025323208,0.000059998474,0.0002574388,0.0012288778,0.0004884766],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0012486367,0.0007973835,0.0007276513,0.002637138,0.001350142,0.0062848786,0.0009505081,0.002277749,0.7094799],"category_scores_gemma":[0.0024231845,0.0003451114,0.0005792856,0.0015157126,0.0007730953,0.0021590362,0.001997917,0.001884633,0.59228516],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005265988,0.0001208931,0.0003524011,0.00021971142,0.0000108205795,0.00010362747,0.00003895819,0.00015855583,0.0013987948,0.0029207724,0.85753375,0.13708915],"study_design_scores_gemma":[0.0000040595987,0.0000116957435,0.0005850541,0.00009082073,0.0000028151255,0.000079140416,0.000041478062,0.00012720216,0.00032543423,0.0005405554,0.99818736,0.000004257236],"about_ca_topic_score_codex":0.0017275508,"about_ca_topic_score_gemma":0.003944515,"teacher_disagreement_score":0.29052007,"about_ca_system_score_codex":0.0012257051,"about_ca_system_score_gemma":0.0017411222,"threshold_uncertainty_score":0.41439158},"labels":[],"label_agreement":null},{"id":"W4246626565","doi":"10.1520/stp47525s","title":"Development of a Canadian National Standard on Design for Disassembly and Adaptability for Buildings","year":2009,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; Natural Resources Canada","funders":"","keywords":"Adaptability; Architectural engineering; Engineering; Computer science; Economics; Management","score_opus":0.03662673246795301,"score_gpt":0.22780646892069065,"score_spread":0.19117973645273764,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246626565","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0045290543,0.007030747,0.08136163,0.006712671,0.0019781955,0.0004895079,0.0016213593,0.000998818,0.8952781],"genre_scores_gemma":[0.033840016,0.011552781,0.18974967,0.0023299165,0.00016463919,0.00030033637,0.0038574238,0.0009207645,0.75728446],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9950277,0.00023307596,0.00017766675,0.00024659032,0.003979368,0.00033555512],"domain_scores_gemma":[0.9966282,0.0001856248,0.000052774467,0.00013568717,0.0028352288,0.00016250192],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026322962,0.001055391,0.00046832516,0.004446505,0.0041988073,0.003944037,0.002098854,0.0017330964,0.009745703],"category_scores_gemma":[0.0031069177,0.00059329293,0.00060526695,0.004318961,0.002600604,0.0019550917,0.0017946246,0.0030972091,0.0036934037],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013918574,0.00005228545,0.0006874186,0.0002828906,0.0000059013973,0.00026373484,0.0033787885,0.002894451,0.0025962882,0.43771046,0.30986163,0.24225226],"study_design_scores_gemma":[0.0000011486335,0.000003905061,0.00060455326,0.0001181494,0.0000034732993,0.00012919235,0.00021744372,0.00052241265,0.0007244973,0.004537108,0.9931206,0.000017470735],"about_ca_topic_score_codex":0.8832147,"about_ca_topic_score_gemma":0.94341284,"teacher_disagreement_score":0.94423586,"about_ca_system_score_codex":0.05576413,"about_ca_system_score_gemma":0.090073995,"threshold_uncertainty_score":0.404599},"labels":[],"label_agreement":null},{"id":"W4246995314","doi":"10.1109/wsc.2012.6465160","title":"Towards the smart construction site: Improving productivity and safety of construction projects using multi-agent systems, real-time simulation and automated machine control","year":2012,"lang":"en","type":"article","venue":"Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Productivity; Building information modeling; Control (management); Computer science; Construction site safety; Systems engineering; Construction industry; Construction management; Risk analysis (engineering); Engineering; Construction engineering; Civil engineering; Artificial intelligence; Operations management","score_opus":0.023146256105421734,"score_gpt":0.24473743795098257,"score_spread":0.22159118184556084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4246995314","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11157088,0.00018422911,0.8820027,0.0009354445,0.000032873024,0.00009036577,0.000049318704,0.00058013434,0.0045540584],"genre_scores_gemma":[0.67577183,0.0003893399,0.321585,0.00009058577,0.00001715129,0.00012125831,0.000119715616,0.00007961732,0.00182542],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988954,0.00056401826,0.00003789947,0.00012375313,0.00031153156,0.00006744067],"domain_scores_gemma":[0.9985368,0.00051552616,0.00029465402,0.00026752622,0.0002360343,0.00014948269],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018902484,0.0006722542,0.00051968935,0.0006692417,0.0005231532,0.0026498619,0.0010881792,0.0015954929,0.0017757069],"category_scores_gemma":[0.0033906035,0.0004826049,0.0005629996,0.00083019055,0.0013968307,0.0033137645,0.002092208,0.0010718707,0.00047714743],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016842068,0.00027114185,0.0066087437,0.0001846785,0.00006364376,0.00015143823,0.000738377,0.85310936,0.012310962,0.03258357,0.0013098185,0.09249981],"study_design_scores_gemma":[0.000038438742,0.00014505399,0.0016507077,0.000031528787,0.000021684365,0.000042279113,0.00036490225,0.9636013,0.004683222,0.024168855,0.005219614,0.00003241553],"about_ca_topic_score_codex":0.0035210387,"about_ca_topic_score_gemma":0.003661069,"teacher_disagreement_score":0.0035210387,"about_ca_system_score_codex":0.00077884964,"about_ca_system_score_gemma":0.0018847721,"threshold_uncertainty_score":0.009996653},"labels":[],"label_agreement":null},{"id":"W4247774183","doi":"10.1109/wsc.2000.899185","title":"Simphony-an integrated environment for construction simulation","year":2002,"lang":"en","type":"article","venue":"2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Animation; Software engineering; Representation (politics); Systems engineering; User Friendly; Human–computer interaction; Engineering; Programming language; Computer graphics (images)","score_opus":0.02444812744051181,"score_gpt":0.22831695077220487,"score_spread":0.20386882333169307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4247774183","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036868951,0.00024645927,0.90915895,0.00010921345,0.00011152916,0.00018591322,0.0016637389,0.06341615,0.021421093],"genre_scores_gemma":[0.09427886,0.0012732623,0.8450797,0.00032207745,0.00014817936,0.0016913507,0.0105233155,0.023285184,0.023398077],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989705,0.00027042176,0.00006687124,0.00010703965,0.0004861605,0.000098980774],"domain_scores_gemma":[0.99913555,0.00039682357,0.000048964568,0.00019775429,0.00013282674,0.00008813488],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016468555,0.00087019574,0.001119613,0.0012696256,0.00051279675,0.0016578252,0.0026394227,0.0011836343,0.03837654],"category_scores_gemma":[0.002514918,0.001078603,0.0013420212,0.0012132318,0.0006196712,0.0023073151,0.0030309297,0.0016543872,0.010640883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000948128,0.000334923,0.0027826917,0.0010480297,0.0002355112,0.00092566217,0.0012394711,0.26279995,0.024418835,0.13300036,0.14231329,0.42995316],"study_design_scores_gemma":[0.00025139347,0.00015107355,0.000925638,0.00016656566,0.00004947706,0.0005269923,0.000094819945,0.47612137,0.01794837,0.030697651,0.47295472,0.000111944806],"about_ca_topic_score_codex":0.0010944584,"about_ca_topic_score_gemma":0.001236528,"teacher_disagreement_score":0.03837654,"about_ca_system_score_codex":0.0005144368,"about_ca_system_score_gemma":0.0010220353,"threshold_uncertainty_score":0.12838233},"labels":[],"label_agreement":null},{"id":"W4248061455","doi":"10.29173/mocs160","title":"Automatic Estimation System of Building Frames Integrated with Structural Design Information (AutoES)","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Korea Agency for Infrastructure Technology Advancement; Ministry of Land, Infrastructure and Transport","keywords":"Schedule; Cost estimate; Estimation; Task (project management); Computer science; Industrial engineering; Software; Mistake; Unavailability; Engineering drawing; Reliability engineering; Engineering; Systems engineering","score_opus":0.007573862904187757,"score_gpt":0.18564841675592483,"score_spread":0.17807455385173707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4248061455","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022567,0.00022074349,0.9398937,0.000067294524,0.00007324381,0.0002136086,0.0014444828,0.030818028,0.0047018575],"genre_scores_gemma":[0.3386492,0.00037899215,0.63972753,0.00010461978,0.000101394115,0.0006496997,0.0066716745,0.0010207194,0.01269611],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983132,0.0001839614,0.00011627688,0.0005576342,0.00073437195,0.00009457075],"domain_scores_gemma":[0.9985856,0.00019004205,0.00017052538,0.00023699252,0.00075418816,0.00006271758],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00097075175,0.0014361126,0.0009491235,0.003680584,0.00047609,0.00095143047,0.0012767994,0.00055563165,0.009714254],"category_scores_gemma":[0.0024268713,0.00067628996,0.00059374946,0.001416875,0.00022518971,0.0014530413,0.0011805405,0.0004859144,0.0035974786],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000479665,0.00017768207,0.010628597,0.0004093332,0.00008964091,0.00022744075,0.0003816741,0.021224905,0.04524468,0.0040484495,0.021223953,0.895864],"study_design_scores_gemma":[0.00021891267,0.00042453528,0.026531445,0.00015537304,0.00020609709,0.0006949528,0.0004737508,0.77884865,0.09643577,0.0055772634,0.09025791,0.00017528253],"about_ca_topic_score_codex":0.0036516523,"about_ca_topic_score_gemma":0.004078661,"teacher_disagreement_score":0.009714254,"about_ca_system_score_codex":0.0005659075,"about_ca_system_score_gemma":0.0008219594,"threshold_uncertainty_score":0.032497406},"labels":[],"label_agreement":null},{"id":"W4249106202","doi":"10.18260/1-2--35439","title":"Usage of Building Information Modeling for Sustainable Development Education","year":2020,"lang":"en","type":"article","venue":"2020 ASEE Virtual Annual Conference Content Access Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Sistema Nacional de Investigadores; Energy Council of Canada; Federation of Canadian Municipalities","keywords":"Building information modeling; Sustainable development; Architecture; Work (physics); Education for sustainable development; Computer science; Engineering management; Knowledge management; Engineering education; Engineering; Process management; Systems engineering; Political science","score_opus":0.037194676165786755,"score_gpt":0.25094872096447146,"score_spread":0.2137540447986847,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249106202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008539409,0.019945988,0.5429657,0.02727997,0.001886944,0.00016189582,0.0023940129,0.0041895937,0.39263648],"genre_scores_gemma":[0.337633,0.03782557,0.46464837,0.0031279826,0.0008872443,0.0004059804,0.0070668003,0.0014329704,0.14697215],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99895006,0.0003298429,0.000078604324,0.00011091427,0.00047503813,0.00005553009],"domain_scores_gemma":[0.99830025,0.00074403785,0.00007988701,0.00036260992,0.00040936505,0.000103945276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019005012,0.00078142935,0.0003703271,0.002921634,0.0007465453,0.0041981535,0.00073573936,0.0009357392,0.012663083],"category_scores_gemma":[0.0039911787,0.00035541932,0.0010990875,0.003830769,0.000826974,0.0039240685,0.0019319236,0.0017253351,0.003518535],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001766968,0.000071191294,0.001932528,0.00033103352,0.00005078941,0.0000966955,0.00041136422,0.02041809,0.0009445532,0.4891195,0.053220354,0.43338624],"study_design_scores_gemma":[0.000005881428,0.000018947065,0.0011406945,0.0005198754,0.000030010548,0.00013600916,0.00030224054,0.05645166,0.0019132035,0.15576951,0.78367627,0.00003579844],"about_ca_topic_score_codex":0.010097105,"about_ca_topic_score_gemma":0.013353659,"teacher_disagreement_score":0.012663083,"about_ca_system_score_codex":0.0024552331,"about_ca_system_score_gemma":0.0023156912,"threshold_uncertainty_score":0.042362273},"labels":[],"label_agreement":null},{"id":"W4249544461","doi":"10.1109/wsc.2010.5679011","title":"3D CAD modeling and visualization of the tunnel construction process in a distributed simulation environment","year":2010,"lang":"en","type":"article","venue":"Proceedings of the 2010 Winter Simulation Conference","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Public Works and Government Services Canada; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Visualization; Computer science; Process (computing); CAD; Animation; Systems engineering; Building information modeling; Software engineering; Computer animation; Solid modeling; Computer Aided Design; Simulation modeling; Process modeling; Simulation software; Software; Engineering drawing; Engineering; Work in process; Data mining; Artificial intelligence","score_opus":0.013234522916254342,"score_gpt":0.23134249177530578,"score_spread":0.21810796885905143,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249544461","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11822321,0.00016774294,0.8574085,0.00035465066,0.00004984638,0.00013576698,0.00047350817,0.004104164,0.01908258],"genre_scores_gemma":[0.78892887,0.00037383233,0.20232934,0.000047382353,0.0000145569475,0.00019845433,0.0004286532,0.00021999031,0.007458949],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997646,0.00006488558,0.000009654734,0.00002505045,0.000114280054,0.000021530677],"domain_scores_gemma":[0.99969935,0.00013607634,0.000022460103,0.000051995245,0.00006540749,0.000024776451],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004198684,0.00046384038,0.00037366204,0.0006648647,0.00044658838,0.0013100991,0.000623939,0.0007981981,0.0049122907],"category_scores_gemma":[0.0007706786,0.000311679,0.0005252235,0.0006090971,0.00055727875,0.00047170327,0.00082429795,0.00048556435,0.00044232683],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013954999,0.000097448436,0.0020722758,0.00009896254,0.000019376248,0.00033597436,0.00091804436,0.921193,0.01730688,0.016284604,0.0017575909,0.039776277],"study_design_scores_gemma":[0.00004152259,0.00004195215,0.0012289169,0.000022803812,0.000014298297,0.00011050664,0.00012010149,0.9846022,0.004928537,0.0023409678,0.006520931,0.00002727573],"about_ca_topic_score_codex":0.018559748,"about_ca_topic_score_gemma":0.021671416,"teacher_disagreement_score":0.018559748,"about_ca_system_score_codex":0.0006809297,"about_ca_system_score_gemma":0.0015172961,"threshold_uncertainty_score":0.03690344},"labels":[],"label_agreement":null},{"id":"W4249725610","doi":"10.1109/wsc.2013.6721676","title":"Location-aware real-time simulation framework for earthmoving projects using automated machine guidance","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Context (archaeology); Retrofitting; Identification (biology); Computer science; Systems engineering; Construction industry; Construction engineering; Engineering; Industrial engineering","score_opus":0.028289351410367494,"score_gpt":0.2809335381447453,"score_spread":0.25264418673437783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249725610","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017998228,0.000075218544,0.9754199,0.000107321655,0.00003165371,0.00008059144,0.00013346718,0.0023192046,0.003834434],"genre_scores_gemma":[0.62504464,0.00030580687,0.37010565,0.00005713718,0.000031627933,0.00048231892,0.00041023587,0.0003090675,0.003253499],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997067,0.00009056124,0.00001957669,0.00004559076,0.000100596015,0.000036981273],"domain_scores_gemma":[0.99961984,0.0001447722,0.00005112179,0.000047314068,0.00008669239,0.00005013386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073361763,0.00083526573,0.0009557825,0.0007032157,0.0006718164,0.0014836447,0.0021144697,0.0012125398,0.0040748375],"category_scores_gemma":[0.0011996472,0.00057776977,0.001072198,0.000512016,0.0006717623,0.0010308101,0.0011487468,0.0009676343,0.000495241],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000260539,0.000029684312,0.0003695574,0.000022636883,0.000014053443,0.000051401435,0.000068339155,0.98542136,0.0010517722,0.007309318,0.0003092657,0.005326636],"study_design_scores_gemma":[0.0000066933662,0.0000060446523,0.00003389396,0.0000028403188,0.0000036018446,0.000008451336,0.000007737113,0.99792874,0.00020719408,0.0008760103,0.00091514,0.0000035977864],"about_ca_topic_score_codex":0.01895249,"about_ca_topic_score_gemma":0.016221482,"teacher_disagreement_score":0.01895249,"about_ca_system_score_codex":0.0010476375,"about_ca_system_score_gemma":0.0017685621,"threshold_uncertainty_score":0.03768432},"labels":[],"label_agreement":null},{"id":"W4249847880","doi":"10.29173/mocs180","title":"Evaluation of the Impact of Dynamic Work Stations Versus Static Work Stations in Wood Framing Prefabrication using Hybrid Simulation","year":2015,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Modular design; Prefabrication; Production line; Work (physics); Workflow; Discrete event simulation; Factory (object-oriented programming); Production (economics); Work in process; Industrial engineering; Lead time; Work order; Manufacturing; Computer science; Manufacturing engineering; Engineering; Reliability engineering; Operations management; Simulation; Civil engineering; Mechanical engineering","score_opus":0.03782742012952542,"score_gpt":0.29143013190288475,"score_spread":0.25360271177335936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249847880","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96311516,0.00031017527,0.028197182,0.00010825908,0.000037072157,0.00010543314,0.00018429739,0.00021805457,0.007724351],"genre_scores_gemma":[0.99488443,0.00009001987,0.004375625,0.00000885518,0.0000021369615,0.00003713036,0.00006126686,0.000009725966,0.0005307626],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995202,0.00017619685,0.00002398976,0.00005955409,0.00010749557,0.00011261593],"domain_scores_gemma":[0.9980811,0.0013614348,0.00015032948,0.00009535788,0.00021081931,0.00010105559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010319316,0.0008746714,0.0007545875,0.00077017717,0.00048133187,0.0011985725,0.00086078746,0.0010350103,0.0017188314],"category_scores_gemma":[0.0019019564,0.00039051208,0.00081329566,0.0006493314,0.0004219034,0.0006288059,0.0006905549,0.00058210554,0.0001505298],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021076521,0.00011449176,0.0021008183,0.000054840573,0.0000178604,0.00003746621,0.000033962522,0.9906218,0.001841458,0.00031587057,0.00006110998,0.004589541],"study_design_scores_gemma":[0.000021347138,0.00037744423,0.0009718228,0.000009290029,0.000023146962,0.0000078680605,0.00007337389,0.99633706,0.0018320074,0.00012611705,0.00021140704,0.000009145373],"about_ca_topic_score_codex":0.014513124,"about_ca_topic_score_gemma":0.008906125,"teacher_disagreement_score":0.014513124,"about_ca_system_score_codex":0.0010391487,"about_ca_system_score_gemma":0.00080198044,"threshold_uncertainty_score":0.02885729},"labels":[],"label_agreement":null},{"id":"W4249851612","doi":"10.22215/etd/2013-07003","title":"Symbiotic office programming in urban high-rises : linked spaces as a means of inter-office communication","year":2013,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University; Canadian Heritage; Library and Archives Canada","funders":"","keywords":"Computer science; Humanities; Art","score_opus":0.00773628873354366,"score_gpt":0.22521021934329744,"score_spread":0.21747393060975378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4249851612","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40178415,0.00087036623,0.24923463,0.002359029,0.00014027768,0.00012114144,0.000086057364,0.00050839694,0.344896],"genre_scores_gemma":[0.9064031,0.00059805653,0.05832739,0.000077157885,0.000025276991,0.00007761012,0.00006260914,0.00012989865,0.034298886],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.999148,0.00045011356,0.000017811048,0.000085028005,0.0001645884,0.00013440478],"domain_scores_gemma":[0.9993125,0.00022333309,0.00006202753,0.00013928325,0.00007452488,0.00018826379],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073384173,0.0002812575,0.00015497424,0.000490645,0.0018222132,0.004577176,0.00079961173,0.00067563454,0.009385538],"category_scores_gemma":[0.0012354996,0.0002010381,0.00023125959,0.0011570752,0.0021713565,0.003791825,0.005659004,0.0011324487,0.0012177646],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015364528,0.00035965,0.0041539613,0.00019412268,0.000020621657,0.00071482797,0.05832068,0.0078835925,0.0058768396,0.62385327,0.0064184195,0.29205036],"study_design_scores_gemma":[0.000082682534,0.00040201194,0.008949987,0.00055741484,0.00006103958,0.0009209265,0.14056496,0.048640873,0.012279748,0.31015286,0.4773098,0.00007763973],"about_ca_topic_score_codex":0.0015911895,"about_ca_topic_score_gemma":0.0034910417,"teacher_disagreement_score":0.009385538,"about_ca_system_score_codex":0.0006637261,"about_ca_system_score_gemma":0.0016001193,"threshold_uncertainty_score":0.0313977},"labels":[],"label_agreement":null},{"id":"W4250016131","doi":"10.1109/wsc.2015.7408500","title":"Simulation based multi-objective cost-time trade-off for multi-family residential off-site construction","year":2015,"lang":"en","type":"article","venue":"2015 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Ambiguity; Task (project management); Process (computing); Computer science; Control (management); Order (exchange); Work (physics); Cost estimate; Operations research; Industrial engineering; Reliability engineering; Engineering; Systems engineering; Business","score_opus":0.05482280833876064,"score_gpt":0.3000320759504613,"score_spread":0.24520926761170064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250016131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6262864,0.00032883065,0.35188988,0.00036883206,0.000041085237,0.00021728907,0.00022948429,0.00025527866,0.020383032],"genre_scores_gemma":[0.9785816,0.00010146449,0.01923207,0.000016314949,0.0000031930126,0.00013349472,0.00006782199,0.000024340332,0.0018396367],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949265,0.00029332231,0.000013793528,0.000037016787,0.00007093359,0.0000923389],"domain_scores_gemma":[0.9982406,0.0013636283,0.00012070925,0.00005154531,0.00013230894,0.00009125177],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014972057,0.00086300366,0.0010353655,0.0008094828,0.00053436856,0.0011789213,0.0008632993,0.0011179578,0.004352446],"category_scores_gemma":[0.002014829,0.0006998062,0.0011284928,0.00076779013,0.000616774,0.000773246,0.0009231349,0.000828432,0.00015408895],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002055584,0.000015504173,0.00016303858,0.0000054207517,0.0000048930815,0.000009877653,0.0000054283355,0.9986759,0.00008712914,0.0004955394,0.000018557092,0.0004980592],"study_design_scores_gemma":[0.000004797246,0.000016939517,0.00006885058,0.0000013803992,0.000002619947,0.0000019663764,0.0000064207534,0.9995515,0.00007138002,0.00022715307,0.000045219283,0.0000018152482],"about_ca_topic_score_codex":0.014189205,"about_ca_topic_score_gemma":0.011578864,"teacher_disagreement_score":0.014189205,"about_ca_system_score_codex":0.0017740367,"about_ca_system_score_gemma":0.0014622604,"threshold_uncertainty_score":0.028213263},"labels":[],"label_agreement":null},{"id":"W4250280947","doi":"10.33423/jabe.v22i12.3895","title":"Data Templates – Traceability and Digital Record Through Project Life-Cycle","year":2020,"lang":"en","type":"article","venue":"Journal of Applied Business and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Traceability; TRACE (psycholinguistics); Computer science; Product (mathematics); Supply chain; Product lifecycle; Database; Business; New product development; Software engineering; Marketing","score_opus":0.03216187071559049,"score_gpt":0.21205949723574136,"score_spread":0.17989762652015087,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250280947","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13400194,0.0012716042,0.7626513,0.0042623985,0.0002562869,0.0008028964,0.003864464,0.0023264918,0.09056258],"genre_scores_gemma":[0.6718202,0.001278244,0.3040086,0.00029175132,0.000058098612,0.0006284166,0.004344233,0.00068993523,0.01688057],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98708993,0.0044438024,0.0013636656,0.0020047692,0.004641329,0.00045644],"domain_scores_gemma":[0.95118284,0.013285218,0.004307287,0.024451654,0.005851299,0.00092171394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011413033,0.0005397206,0.0004271906,0.0036200304,0.0010865834,0.008479264,0.002183324,0.0012452691,0.0055754636],"category_scores_gemma":[0.047526285,0.0007841898,0.00058458274,0.0046435557,0.002340001,0.016206786,0.004247192,0.0014603407,0.002408639],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001934793,0.00026125574,0.029650617,0.00038625769,0.000046531444,0.00020126703,0.0059817573,0.010153905,0.0039996034,0.2993545,0.005316509,0.6444543],"study_design_scores_gemma":[0.00005806621,0.0006532636,0.030346649,0.0014833363,0.0001262247,0.0014658424,0.008200461,0.042936783,0.0314357,0.3668521,0.5161208,0.00032075512],"about_ca_topic_score_codex":0.004408288,"about_ca_topic_score_gemma":0.003355398,"teacher_disagreement_score":0.011413033,"about_ca_system_score_codex":0.0023403773,"about_ca_system_score_gemma":0.0058193994,"threshold_uncertainty_score":0.060358644},"labels":[],"label_agreement":null},{"id":"W4250367747","doi":"10.32920/ryerson.14660328.v1","title":"Multidisciplinary design optimization of stamped and welded structures","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Multidisciplinary design optimization; Finite element method; Constraint (computer-aided design); Welding; Multidisciplinary approach; Computer science; Engineering design process; Engineering; Mechanical engineering; Structural engineering","score_opus":0.01676259080856053,"score_gpt":0.2278894630191357,"score_spread":0.2111268722105752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250367747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16261764,0.0005138814,0.8227979,0.00017356941,0.000048701662,0.00013218827,0.00012844132,0.0002147724,0.013372965],"genre_scores_gemma":[0.6739036,0.00032303095,0.32007378,0.0000496211,0.000014502336,0.00036234432,0.00018322439,0.00018084417,0.004909038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995054,0.00016903003,0.00001979089,0.000061110535,0.00019625916,0.00004845901],"domain_scores_gemma":[0.99946374,0.0002963878,0.000066540095,0.000060020535,0.00008620311,0.000027148693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013209317,0.0007613871,0.0008603447,0.00086745596,0.00034550525,0.00094684295,0.0006170795,0.0007976544,0.0021093595],"category_scores_gemma":[0.0017725046,0.00054090325,0.00087039894,0.0005502357,0.0005722294,0.00053813664,0.00093674543,0.0006323969,0.00030914164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002069989,0.000025743402,0.0003043138,0.00007737113,0.000016206535,0.00003295135,0.00003080638,0.9773393,0.0035678258,0.0033647998,0.00015732537,0.0150625445],"study_design_scores_gemma":[0.0000075721796,0.000068134475,0.00022805842,0.000009192253,0.000008393068,0.00001642741,0.00002752782,0.99479264,0.0016772554,0.0021331578,0.0010264562,0.000005145913],"about_ca_topic_score_codex":0.0009695418,"about_ca_topic_score_gemma":0.0013097498,"teacher_disagreement_score":0.0021093595,"about_ca_system_score_codex":0.00061482226,"about_ca_system_score_gemma":0.0009908114,"threshold_uncertainty_score":0.0070564747},"labels":[],"label_agreement":null},{"id":"W4250956078","doi":"10.1139/cjce-28-3-383","title":"Performance measurement indices for simulated construction operations","year":2001,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering; Reliability engineering; Civil engineering","score_opus":0.01261772601370272,"score_gpt":0.18037044343119316,"score_spread":0.16775271741749043,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4250956078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6176957,0.00018184453,0.3571314,0.00025285018,0.00007962691,0.00072275766,0.0025876923,0.0022016624,0.019146571],"genre_scores_gemma":[0.9448696,0.000042316537,0.052781224,0.000011483662,0.000004701182,0.00030071303,0.0012392589,0.000055325287,0.0006953654],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9972082,0.0011023869,0.00028917706,0.00025943326,0.0010045985,0.00013615069],"domain_scores_gemma":[0.9903542,0.004808989,0.0012261957,0.00074431056,0.0026142627,0.00025198862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046658623,0.0007249719,0.0004224048,0.002480858,0.00038481777,0.0012456403,0.000677599,0.00048164028,0.002563847],"category_scores_gemma":[0.01677089,0.00020562082,0.00041508026,0.0021731425,0.00048160975,0.0011289696,0.00086731295,0.0007876569,0.00050639256],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005446376,0.0004601674,0.022436725,0.00016610714,0.00006808773,0.00004600903,0.0002651933,0.9142411,0.0023296762,0.008446183,0.0015748292,0.049421325],"study_design_scores_gemma":[0.000033706572,0.0004527471,0.009994511,0.000022007538,0.00002087785,0.000024501269,0.00011217012,0.9787088,0.005837833,0.0030415156,0.0017187572,0.000032645297],"about_ca_topic_score_codex":0.004449349,"about_ca_topic_score_gemma":0.0029686252,"teacher_disagreement_score":0.0046658623,"about_ca_system_score_codex":0.0022294715,"about_ca_system_score_gemma":0.0010451708,"threshold_uncertainty_score":0.024675727},"labels":[],"label_agreement":null},{"id":"W4251186688","doi":"10.32920/ryerson.14660328","title":"Multidisciplinary design optimization of stamped and welded structures","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Multidisciplinary design optimization; Finite element method; Welding; Constraint (computer-aided design); Multidisciplinary approach; Engineering design process; Computer science; Engineering; Mechanical engineering; Structural engineering","score_opus":0.01676259080856053,"score_gpt":0.2278894630191357,"score_spread":0.2111268722105752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251186688","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16261764,0.0005138814,0.8227979,0.00017356941,0.000048701662,0.00013218827,0.00012844132,0.0002147724,0.013372965],"genre_scores_gemma":[0.6739036,0.00032303095,0.32007378,0.0000496211,0.000014502336,0.00036234432,0.00018322439,0.00018084417,0.004909038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995054,0.00016903003,0.00001979089,0.000061110535,0.00019625916,0.00004845901],"domain_scores_gemma":[0.99946374,0.0002963878,0.000066540095,0.000060020535,0.00008620311,0.000027148693],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013209317,0.0007613871,0.0008603447,0.00086745596,0.00034550525,0.00094684295,0.0006170795,0.0007976544,0.0021093595],"category_scores_gemma":[0.0017725046,0.00054090325,0.00087039894,0.0005502357,0.0005722294,0.00053813664,0.00093674543,0.0006323969,0.00030914164],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002069989,0.000025743402,0.0003043138,0.00007737113,0.000016206535,0.00003295135,0.00003080638,0.9773393,0.0035678258,0.0033647998,0.00015732537,0.0150625445],"study_design_scores_gemma":[0.0000075721796,0.000068134475,0.00022805842,0.000009192253,0.000008393068,0.00001642741,0.00002752782,0.99479264,0.0016772554,0.0021331578,0.0010264562,0.000005145913],"about_ca_topic_score_codex":0.0009695418,"about_ca_topic_score_gemma":0.0013097498,"teacher_disagreement_score":0.0021093595,"about_ca_system_score_codex":0.00061482226,"about_ca_system_score_gemma":0.0009908114,"threshold_uncertainty_score":0.0070564747},"labels":[],"label_agreement":null},{"id":"W4251639711","doi":"10.4018/978-1-5225-7314-2.ch022","title":"Minimizing Construction Emissions Using Building Information Modeling and Decision-Making Techniques","year":2018,"lang":"en","type":"book-chapter","venue":"IGI Global eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ranking (information retrieval); Building information modeling; Greenhouse gas; Multiple-criteria decision analysis; Life-cycle assessment; Order (exchange); Engineering; Computer science; Operations research; Environmental economics; Operations management; Production (economics); Business; Machine learning","score_opus":0.013605493774414721,"score_gpt":0.24830278339588005,"score_spread":0.23469728962146533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251639711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009473889,0.00085439766,0.9772285,0.0002486676,0.000025079355,0.00008161288,0.00010693541,0.00017547117,0.011805327],"genre_scores_gemma":[0.38881296,0.0023393347,0.6033754,0.000074047035,0.000038354472,0.00045394705,0.00032203452,0.000112434805,0.004471589],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99886984,0.0004926996,0.00004783355,0.00010767446,0.00038618478,0.00009573879],"domain_scores_gemma":[0.99932694,0.00044780012,0.000062283856,0.000058029305,0.00008410458,0.000020883776],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016127886,0.0016174774,0.0013372226,0.0013148912,0.0005753658,0.002837257,0.0015148268,0.0011536133,0.0022911462],"category_scores_gemma":[0.0016560947,0.0006518942,0.001485544,0.0023738816,0.0006228004,0.0020343736,0.001567988,0.0010506801,0.0003970755],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001689576,0.000043194566,0.00015457759,0.0001296735,0.000035364017,0.000040339513,0.000048917715,0.9361463,0.0010779802,0.023590507,0.00045180222,0.038264334],"study_design_scores_gemma":[0.0000064167166,0.0000240013,0.000083313695,0.00004690348,0.000022957962,0.000018771816,0.000036870053,0.9694616,0.0010217085,0.026718397,0.0025454354,0.000013681946],"about_ca_topic_score_codex":0.0038800803,"about_ca_topic_score_gemma":0.004537357,"teacher_disagreement_score":0.0038800803,"about_ca_system_score_codex":0.0016455037,"about_ca_system_score_gemma":0.001969744,"threshold_uncertainty_score":0.011939049},"labels":[],"label_agreement":null},{"id":"W4251944493","doi":"10.32920/ryerson.14645691","title":"Development of simulation model for evaluating operational performance of railroad networks","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Visual Basic for Applications; Computer science; Scheduling (production processes); Software; State (computer science); Blocking (statistics); Operations research; Engineering; Computer network; Operations management; Operating system","score_opus":0.05199394372312149,"score_gpt":0.29461880489115294,"score_spread":0.24262486116803145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4251944493","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1507188,0.0002779359,0.8122023,0.00028544344,0.00007849837,0.00043251438,0.0015885419,0.0022167282,0.032199174],"genre_scores_gemma":[0.85358715,0.00045402237,0.13669713,0.000045161487,0.000012920893,0.00091325684,0.0012386551,0.00017253196,0.006879157],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960977,0.00012922383,0.000028545765,0.00004772153,0.0001282599,0.000056438745],"domain_scores_gemma":[0.9993849,0.00032946828,0.000045213903,0.000051007028,0.00016447442,0.000024857916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071329315,0.0006889221,0.00080591155,0.0006339484,0.0005120099,0.0010515618,0.0012066225,0.0010410869,0.0031626758],"category_scores_gemma":[0.0013786409,0.00045465535,0.0010078389,0.00068113796,0.00038228754,0.00087042217,0.0004864972,0.000846273,0.0004963325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011328681,0.000012919918,0.00030592474,0.000011864806,0.000004063851,0.000016651065,0.00001102231,0.99552613,0.00038675847,0.0022180441,0.00009471079,0.0014006168],"study_design_scores_gemma":[0.000004870518,0.000009302522,0.000062143416,0.0000049886967,0.0000030631236,0.0000047497406,0.000005920197,0.9984611,0.00047915432,0.0005601593,0.0004012539,0.000003303827],"about_ca_topic_score_codex":0.017036354,"about_ca_topic_score_gemma":0.0070861275,"teacher_disagreement_score":0.017036354,"about_ca_system_score_codex":0.0013891046,"about_ca_system_score_gemma":0.0017202876,"threshold_uncertainty_score":0.033874393},"labels":[],"label_agreement":null},{"id":"W4252198646","doi":"10.1109/wsc.2013.6721693","title":"Effective simulation of earth moving projects","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Computer science; Context (archaeology); Process (computing); Task (project management); Resource (disambiguation); Earth observation; Systems engineering; Software engineering; Industrial engineering; Simulation; Engineering; Programming language; Aerospace engineering; Geology","score_opus":0.015410176669347362,"score_gpt":0.2325798939728802,"score_spread":0.21716971730353285,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252198646","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45646527,0.00014667677,0.48127127,0.00026476098,0.000053610474,0.00026611582,0.0009946199,0.001920886,0.05861669],"genre_scores_gemma":[0.9312879,0.00018497779,0.06315233,0.000024762856,0.0000060401244,0.00022507319,0.00045354108,0.00013757084,0.004527822],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996321,0.00011820234,0.000023254895,0.000041838142,0.00013692671,0.000047695023],"domain_scores_gemma":[0.9994904,0.0002600213,0.000047009988,0.000075001844,0.00009285875,0.000034753786],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006052595,0.00042753015,0.0005049177,0.00055026927,0.00039819977,0.0009856002,0.00085948844,0.0009896981,0.0033551892],"category_scores_gemma":[0.0017482508,0.00027779964,0.00041541498,0.0007535481,0.00045095177,0.0009229344,0.0008856247,0.00045890766,0.00031933963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012279703,0.000014671197,0.00056227547,0.000012776106,0.000003845797,0.000032590353,0.00004158927,0.9923193,0.00042679804,0.0034490589,0.00013418907,0.0029906945],"study_design_scores_gemma":[0.0000085872,0.000012463288,0.00024623115,0.0000052709006,0.000002984365,0.000010576991,0.000033513035,0.99617225,0.0008312581,0.0013434121,0.0013296348,0.0000037892637],"about_ca_topic_score_codex":0.01068068,"about_ca_topic_score_gemma":0.0064025195,"teacher_disagreement_score":0.01068068,"about_ca_system_score_codex":0.00076187303,"about_ca_system_score_gemma":0.0011534331,"threshold_uncertainty_score":0.021237016},"labels":[],"label_agreement":null},{"id":"W4252234187","doi":"10.1007/978-1-4939-7131-2_101426","title":"Virtual Settlement","year":2018,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Settlement (finance); Geography; Computer science; World Wide Web","score_opus":0.009552013253074395,"score_gpt":0.1904195967189135,"score_spread":0.18086758346583912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252234187","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006779906,0.0004867839,0.013318603,0.00030289043,0.00043344742,0.000015853455,0.000054758904,0.00014831804,0.9845613],"genre_scores_gemma":[0.03384104,0.0011910315,0.00585339,0.00017749677,0.00016647665,0.000046347992,0.00021967164,0.00019638652,0.95830816],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995994,0.00007439847,0.000013013114,0.00007056122,0.00019172757,0.00005095331],"domain_scores_gemma":[0.9998956,0.000016505332,0.0000054440643,0.000035488112,0.000031415522,0.000015498641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034922178,0.0009279404,0.00045990615,0.0011368359,0.0023056066,0.0055355113,0.0013422136,0.0014102162,0.12780723],"category_scores_gemma":[0.0008395175,0.00032742412,0.0004130152,0.0011220911,0.0020498324,0.0034637428,0.0031641193,0.0014829829,0.03599291],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014627673,0.000021100703,0.000049467326,0.000060754,0.0000021023302,0.000073549934,0.000451268,0.0011240226,0.0004020018,0.8118319,0.07233045,0.113638744],"study_design_scores_gemma":[0.000003466575,0.000009956177,0.00011037107,0.00007605685,0.0000025336258,0.00016240323,0.00033529403,0.0009189501,0.00037531118,0.086641334,0.91135776,0.0000065740196],"about_ca_topic_score_codex":0.0022232218,"about_ca_topic_score_gemma":0.004022411,"teacher_disagreement_score":0.12780723,"about_ca_system_score_codex":0.001525692,"about_ca_system_score_gemma":0.0011989418,"threshold_uncertainty_score":0.42755777},"labels":[],"label_agreement":null},{"id":"W4252575285","doi":"10.5703/1288284315875","title":"4D Modeling","year":2007,"lang":"en","type":"report","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Purdue Pharma (Canada)","funders":"","keywords":"Computer science; Schedule; Product (mathematics); Systems engineering; Software engineering; Engineering","score_opus":0.035770920634222395,"score_gpt":0.2603751006347322,"score_spread":0.2246041800005098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252575285","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027623603,0.0013782892,0.7380974,0.0009642908,0.00088797533,0.00031674147,0.003334242,0.005056743,0.24720193],"genre_scores_gemma":[0.15913169,0.006532456,0.5906758,0.0011736691,0.0003347979,0.0010738713,0.01456175,0.0034101903,0.22310577],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99845266,0.00020367108,0.00008324263,0.00020657227,0.0009331373,0.00012077267],"domain_scores_gemma":[0.9991953,0.00014540575,0.000042490297,0.00026781778,0.0002960619,0.00005286964],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00083285366,0.0015140069,0.00080586976,0.0021805668,0.001032143,0.005033326,0.0027333612,0.002317782,0.07781572],"category_scores_gemma":[0.0023117715,0.0007812618,0.0017553938,0.0020624902,0.0010027078,0.0032226143,0.00411128,0.0014054793,0.026080191],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016947708,0.00008376225,0.0011704188,0.0006993123,0.00006060508,0.00066754915,0.0006216394,0.1222226,0.011232201,0.4406168,0.116860315,0.30559534],"study_design_scores_gemma":[0.000022778639,0.00003664034,0.0002932375,0.00015157163,0.0000271276,0.0004993281,0.000118201126,0.096629135,0.005462371,0.047848895,0.84885454,0.000056133675],"about_ca_topic_score_codex":0.0060876813,"about_ca_topic_score_gemma":0.0045308312,"teacher_disagreement_score":0.07781572,"about_ca_system_score_codex":0.0011460225,"about_ca_system_score_gemma":0.0015530052,"threshold_uncertainty_score":0.26031947},"labels":[],"label_agreement":null},{"id":"W4252933484","doi":"10.1109/wsc.2014.7020162","title":"Simulation-based multiobjective optimization of bridge construction processes using parallel computing","year":2014,"lang":"en","type":"article","venue":"Proceedings of the Winter Simulation Conference 2014","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Sorting; Bridge (graph theory); Convergence (economics); Multi-objective optimization; Genetic algorithm; Discrete event simulation; Computation; Mathematical optimization; sort; Distributed computing; Pareto principle; Range (aeronautics); Resource (disambiguation); Algorithm; Simulation; Engineering; Mathematics; Machine learning","score_opus":0.020692885636552104,"score_gpt":0.24846018029559627,"score_spread":0.22776729465904416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4252933484","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08590183,0.00034209553,0.897586,0.0002247075,0.000059594797,0.00015128174,0.00008053138,0.000372876,0.015281013],"genre_scores_gemma":[0.87548286,0.00042273186,0.12026746,0.00004063727,0.000019809462,0.00040918883,0.00011102563,0.00006212461,0.0031840622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969006,0.00013711094,0.00001247948,0.0000357853,0.0000873608,0.000037262387],"domain_scores_gemma":[0.9996165,0.00023232201,0.00004325411,0.000027409686,0.000057499892,0.000022911523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000763097,0.00079157,0.0010511341,0.0006263789,0.00066278497,0.0010073277,0.0007558153,0.00080574764,0.0015823655],"category_scores_gemma":[0.0010216997,0.00053965964,0.0010392596,0.00093849725,0.0006525599,0.00055957196,0.00080214284,0.00064922904,0.00016486473],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000054174056,0.0000054052834,0.000063754305,0.000005290937,0.0000040309724,0.000007818559,0.0000038048656,0.9982345,0.00017053404,0.00052823266,0.00001563981,0.0009554933],"study_design_scores_gemma":[0.0000031551215,0.000005545946,0.000025281506,0.0000010176774,0.0000015233269,0.000001736697,0.0000018287265,0.9993741,0.00010731711,0.00039631897,0.00008122528,9.882386e-7],"about_ca_topic_score_codex":0.0112632485,"about_ca_topic_score_gemma":0.00687575,"teacher_disagreement_score":0.0112632485,"about_ca_system_score_codex":0.0010530871,"about_ca_system_score_gemma":0.0019272702,"threshold_uncertainty_score":0.022395372},"labels":[],"label_agreement":null},{"id":"W4254056783","doi":"10.22260/isarc2012/0020","title":"RFID Indoor Location Identification for Construction Projects","year":2012,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Concordia University","keywords":"Trilateration; Radio-frequency identification; Identification (biology); Computer science; Location tracking; Process (computing); Global Positioning System; Real-time locating system; Location awareness; Real-time computing; Location-based service; Telecommunications; Engineering; Computer security","score_opus":0.013727294355425667,"score_gpt":0.21460130086896942,"score_spread":0.20087400651354376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254056783","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01132207,0.00071981794,0.97731405,0.000088537985,0.00010182286,0.00010737419,0.00017000905,0.0014842693,0.008692025],"genre_scores_gemma":[0.34456462,0.0013597995,0.6344294,0.00012254347,0.000067112625,0.000287964,0.0007557919,0.000134348,0.018278513],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9986486,0.00039193936,0.00006627382,0.0002696266,0.0005288143,0.00009476769],"domain_scores_gemma":[0.999401,0.00011175756,0.000121180325,0.00012694103,0.00021819014,0.000021049009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006574224,0.00058916217,0.00036768382,0.0017407947,0.00039640168,0.0010412475,0.0007047491,0.0006039169,0.003043021],"category_scores_gemma":[0.0014266527,0.00025855654,0.0005753392,0.0016597954,0.00038280227,0.0009562597,0.0008777931,0.0004632485,0.0032773535],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014798986,0.00011701157,0.0071226936,0.000765497,0.000048048205,0.0005924949,0.00046478803,0.03660335,0.07392767,0.021037271,0.0056757396,0.8534975],"study_design_scores_gemma":[0.000058989175,0.0010391802,0.030733991,0.0007545737,0.0002115538,0.0058137085,0.0018725217,0.38467816,0.20153996,0.019239781,0.35371137,0.00034626477],"about_ca_topic_score_codex":0.001002035,"about_ca_topic_score_gemma":0.0009048273,"teacher_disagreement_score":0.003043021,"about_ca_system_score_codex":0.00043844435,"about_ca_system_score_gemma":0.0006212116,"threshold_uncertainty_score":0.010179937},"labels":[],"label_agreement":null},{"id":"W4254114611","doi":"10.1115/detc2006-99412","title":"Review of Metamodeling Techniques in Support of Engineering Design Optimization","year":2006,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":145,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Metamodeling; Scope (computer science); Computer science; Computation; Engineering design process; Process (computing); Systems engineering; Industrial engineering; Management science; Software engineering; Engineering; Algorithm","score_opus":0.010583060926884963,"score_gpt":0.20605810549389633,"score_spread":0.19547504456701137,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4254114611","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011780425,0.035660867,0.95609933,0.00039382567,0.00013296155,0.000051793133,0.00010991481,0.0006164542,0.0057568923],"genre_scores_gemma":[0.036107596,0.09817355,0.8610937,0.0002918111,0.00032896112,0.0002708953,0.00053408695,0.00032872122,0.0028706018],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983095,0.0006044275,0.00020651407,0.00018102233,0.000651102,0.00004750657],"domain_scores_gemma":[0.9975553,0.0014663222,0.0001769959,0.000409478,0.0003618305,0.000030061465],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025458205,0.0012741145,0.0015378578,0.0023969247,0.00043132284,0.0014461578,0.0021026114,0.0012459897,0.0030245923],"category_scores_gemma":[0.0040158145,0.0010429686,0.0018433497,0.0041553755,0.0006956944,0.0019524745,0.00086645316,0.0014692779,0.0018384298],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006227181,0.000078681864,0.0004636903,0.005085226,0.00018672645,0.00020321165,0.00020239894,0.17027691,0.009278672,0.120320454,0.007361317,0.68648046],"study_design_scores_gemma":[0.00006351707,0.00016054738,0.00090849394,0.0025673083,0.00026254883,0.0009933292,0.0001356043,0.34436488,0.014486966,0.14102533,0.49490184,0.00012961474],"about_ca_topic_score_codex":0.0012282449,"about_ca_topic_score_gemma":0.0010031578,"teacher_disagreement_score":0.0030245923,"about_ca_system_score_codex":0.0007175988,"about_ca_system_score_gemma":0.0011759475,"threshold_uncertainty_score":0.013463736},"labels":[],"label_agreement":null},{"id":"W4255096029","doi":"10.11159/iccste21","title":"Proceedings of the 6th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'21)","year":2021,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Lakehead University; Toronto Metropolitan University; University of British Columbia; University of Toronto","funders":"University of British Columbia","keywords":"Engineering; Civil engineering; Construction engineering","score_opus":0.01362511255324676,"score_gpt":0.21677144235946777,"score_spread":0.20314632980622102,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255096029","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029486978,0.034393493,0.3146317,0.013600407,0.08562728,0.0007137563,0.003403875,0.0049298247,0.5132126],"genre_scores_gemma":[0.04082142,0.013336053,0.05729675,0.0009616942,0.0034009789,0.00032762397,0.0061635147,0.0011548741,0.8765371],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984289,0.00039453537,0.000069387315,0.00021832429,0.0007193933,0.00016942526],"domain_scores_gemma":[0.9974432,0.00028898052,0.000059932107,0.00039721542,0.0013620233,0.0004485693],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0022048706,0.0012410189,0.0010415467,0.0014734967,0.0008298782,0.0028340938,0.0011919916,0.0012566833,0.09652554],"category_scores_gemma":[0.002120876,0.00032992274,0.00082563004,0.0011478531,0.0009949105,0.0016164097,0.0019434246,0.0021900316,0.04823956],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024187102,0.00030725505,0.0013210691,0.00027046064,0.00004841625,0.0001970116,0.00015929218,0.0019149217,0.0064439457,0.0064886236,0.6341393,0.34846768],"study_design_scores_gemma":[0.00001553204,0.00014814001,0.002793122,0.00017464797,0.00003211421,0.00032156336,0.00015516634,0.008886045,0.0029794867,0.0031909957,0.98127997,0.000023344008],"about_ca_topic_score_codex":0.0043260003,"about_ca_topic_score_gemma":0.012905856,"teacher_disagreement_score":0.90347445,"about_ca_system_score_codex":0.0008840144,"about_ca_system_score_gemma":0.0022671302,"threshold_uncertainty_score":0.32291013},"labels":[],"label_agreement":null},{"id":"W4255467053","doi":"10.1139/cjce-28-2-314","title":"Étude comparative de modèles phénoménologiques décrivant le comportement au jeune âge du béton. Partie 1.","year":2001,"lang":"fr","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Ton; Humanities; Art; Geography; Archaeology","score_opus":0.01990227485254114,"score_gpt":0.21285418236511858,"score_spread":0.19295190751257743,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255467053","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5005197,0.010199675,0.35969633,0.00199141,0.00049280067,0.00031711318,0.0027436414,0.0007376939,0.12330173],"genre_scores_gemma":[0.9268154,0.004271239,0.046764787,0.00010254831,0.000059981496,0.00027627798,0.0010484935,0.00017381797,0.020487463],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996112,0.0001703486,0.000019776871,0.00006346755,0.0001019694,0.000033254986],"domain_scores_gemma":[0.99840826,0.0012073874,0.000059550388,0.00010099246,0.00019610544,0.000027756483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011023937,0.0005930968,0.00064536656,0.001072603,0.0009432803,0.002718227,0.0009786558,0.0013482197,0.0072432724],"category_scores_gemma":[0.004581952,0.0004976694,0.001328641,0.0014498816,0.0009818432,0.0019592533,0.0007091265,0.0009629994,0.0007436657],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047384223,0.00028164635,0.015683847,0.00077782886,0.00029428504,0.00062277843,0.008636109,0.6095008,0.00490612,0.27542531,0.004883077,0.078514345],"study_design_scores_gemma":[0.00016035231,0.00019810104,0.012735046,0.00051003543,0.00031021703,0.0004597938,0.0041075666,0.8488882,0.0031480775,0.05465869,0.07465805,0.00016583594],"about_ca_topic_score_codex":0.079929784,"about_ca_topic_score_gemma":0.06477485,"teacher_disagreement_score":0.079929784,"about_ca_system_score_codex":0.0023498277,"about_ca_system_score_gemma":0.0017643748,"threshold_uncertainty_score":0.15892905},"labels":[],"label_agreement":null},{"id":"W4255964485","doi":"10.2307/j.ctv15wxr5j.24","title":"Implementing Collection Life Cycle Management","year":2016,"lang":"en","type":"book-chapter","venue":"Purdue University Press eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Purdue Pharma (Canada); University of Waterloo","funders":"","keywords":"Computer science","score_opus":0.009497029659596824,"score_gpt":0.16805593728228735,"score_spread":0.15855890762269054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4255964485","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019760117,0.0026449577,0.6644232,0.011810373,0.0011290594,0.004375253,0.0005033362,0.007627175,0.2877265],"genre_scores_gemma":[0.1444258,0.0026573883,0.7101785,0.002593018,0.00025319352,0.002715413,0.0015007522,0.0020782796,0.1335976],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9828614,0.006299758,0.0011805195,0.0015537997,0.007006787,0.0010977065],"domain_scores_gemma":[0.97399706,0.0065518934,0.0014539823,0.005339267,0.0112505425,0.0014072522],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029024528,0.0010330677,0.0005250178,0.003666261,0.0037555047,0.011987517,0.0048527084,0.0018788,0.011472414],"category_scores_gemma":[0.02796054,0.00094350957,0.0008041108,0.0032892912,0.0025930875,0.011344829,0.0072359997,0.0034418406,0.005533317],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006333362,0.00040676733,0.003046586,0.0007054337,0.000034297813,0.00018972048,0.009373497,0.0048839343,0.0027712893,0.11126666,0.06557534,0.80168325],"study_design_scores_gemma":[0.000025407708,0.00013885114,0.0023308976,0.0012206929,0.000025699412,0.00026827736,0.0069032614,0.0065565538,0.0071419873,0.051239066,0.9240331,0.00011615663],"about_ca_topic_score_codex":0.007812558,"about_ca_topic_score_gemma":0.009018643,"teacher_disagreement_score":0.029024528,"about_ca_system_score_codex":0.0074597145,"about_ca_system_score_gemma":0.022486417,"threshold_uncertainty_score":0.15349817},"labels":[],"label_agreement":null},{"id":"W4256255337","doi":"10.32920/ryerson.14656428.v1","title":"The development of a geo-referencing system for machine controlled construction equipment","year":2021,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Excavator; Real-time computing; Kinematics; Systems engineering; Engineering; Mechanical engineering","score_opus":0.01454661700909382,"score_gpt":0.2191094785004344,"score_spread":0.2045628614913406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256255337","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017292148,0.0002151627,0.9714224,0.000108984575,0.00015636023,0.0002775949,0.00012028271,0.0034744912,0.0069325306],"genre_scores_gemma":[0.31672248,0.00046155622,0.66436225,0.0001411701,0.000085568965,0.00038832752,0.0006512283,0.00020363009,0.01698378],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991986,0.000080460464,0.000038778042,0.00016984671,0.00045480178,0.000057434212],"domain_scores_gemma":[0.9994241,0.000069491725,0.000049941824,0.00011779483,0.00030726817,0.00003147287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00084770017,0.0004674815,0.00048175166,0.0006192514,0.000378214,0.0008932703,0.0012488985,0.00092493487,0.0025607857],"category_scores_gemma":[0.0008618175,0.00033194255,0.00038575917,0.00049559237,0.00043099688,0.0009732234,0.0007654192,0.0008962823,0.00213646],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028190968,0.00015742512,0.0033650566,0.0004841023,0.000053051564,0.0004680153,0.00071483105,0.036217395,0.33469132,0.038504664,0.007842951,0.57721925],"study_design_scores_gemma":[0.000113666596,0.0013401215,0.0072247153,0.00019317387,0.00010479169,0.001026405,0.00016493282,0.31625852,0.3721854,0.004061222,0.29716456,0.00016251311],"about_ca_topic_score_codex":0.0012278442,"about_ca_topic_score_gemma":0.00090835686,"teacher_disagreement_score":0.0025607857,"about_ca_system_score_codex":0.0005373173,"about_ca_system_score_gemma":0.0010870964,"threshold_uncertainty_score":0.008566737},"labels":[],"label_agreement":null},{"id":"W4256474920","doi":"10.1109/wsc.1995.478895","title":"Automating the process of building simulation models","year":2005,"lang":"en","type":"article","venue":"Winter Simulation Conference Proceedings, 1995.","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Process (computing); Implementation; Simulation modeling; Aggregate (composite); Modeling and simulation; Systems engineering; Data modeling; Simulation; Software engineering; Engineering; Programming language","score_opus":0.022377822523094944,"score_gpt":0.26999306509403626,"score_spread":0.2476152425709413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256474920","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0027200198,0.000043454143,0.98690003,0.00009039406,0.000027064429,0.00010325857,0.00007289674,0.0051785265,0.0048642],"genre_scores_gemma":[0.058458313,0.00024897247,0.9344986,0.000087326414,0.000022026952,0.0003267084,0.00091491285,0.0020328178,0.0034103147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973756,0.0008057247,0.00022012777,0.00033094577,0.0010933194,0.00017432947],"domain_scores_gemma":[0.99298555,0.0028611235,0.00021740918,0.0027255907,0.0010719916,0.0001382741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003156049,0.0015257363,0.0010410368,0.0016265335,0.0014127904,0.0030906745,0.0020984765,0.0013948951,0.011246697],"category_scores_gemma":[0.00841606,0.0015803175,0.0017187471,0.0010652463,0.001070465,0.0029149181,0.0032629117,0.0029594135,0.004897333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015076417,0.00034471892,0.0020192068,0.0004715626,0.00017596658,0.00045969995,0.0016319919,0.41395462,0.027169514,0.18628299,0.013453557,0.3538854],"study_design_scores_gemma":[0.000038234604,0.000056385907,0.0003790363,0.00013456783,0.00006300004,0.00025345327,0.00016508711,0.7799132,0.02491452,0.059003662,0.13500571,0.000073182455],"about_ca_topic_score_codex":0.006586895,"about_ca_topic_score_gemma":0.008523516,"teacher_disagreement_score":0.011246697,"about_ca_system_score_codex":0.0014634612,"about_ca_system_score_gemma":0.002602882,"threshold_uncertainty_score":0.037624},"labels":[],"label_agreement":null},{"id":"W4256564067","doi":"10.22360/simaud.2017.simaud.016","title":"Visualization of Building Performance using Sankey Diagrams to Enhance the Decision-Making Process","year":2017,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Carleton University","funders":"","keywords":"Visualization; Workflow; Computer science; Process (computing); Systems engineering; Relation (database); Upstream (networking); Efficient energy use; Architectural engineering; Engineering; Database","score_opus":0.012359194471432513,"score_gpt":0.3212843790567649,"score_spread":0.30892518458533236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256564067","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03305755,0.00032753698,0.9404215,0.0006980635,0.00015953091,0.00036333833,0.0025574933,0.008270545,0.01414443],"genre_scores_gemma":[0.20169932,0.0007858387,0.7905097,0.00008815937,0.000044634282,0.00048535474,0.0017675632,0.0012078785,0.0034115326],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985605,0.00075060053,0.00014771958,0.0001477486,0.00031345955,0.00008004587],"domain_scores_gemma":[0.99262404,0.0052132476,0.0003881416,0.0005836189,0.0009877714,0.0002031343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032917557,0.0015024986,0.00070076017,0.0035926192,0.0007901965,0.0038229416,0.0009081236,0.0007660259,0.013380354],"category_scores_gemma":[0.010360185,0.0004833019,0.0008592309,0.002429425,0.0005791081,0.0027161501,0.0019269427,0.0012971831,0.0016089596],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014209073,0.000526122,0.009393211,0.0027080812,0.0001682745,0.0016346014,0.016813768,0.2921464,0.047181066,0.18665974,0.036519546,0.4048283],"study_design_scores_gemma":[0.0001693273,0.00023072585,0.0041947155,0.00080320885,0.00011634509,0.0003945835,0.002696004,0.6564716,0.037553158,0.103317246,0.19382356,0.00022953896],"about_ca_topic_score_codex":0.0035304555,"about_ca_topic_score_gemma":0.004090645,"teacher_disagreement_score":0.013380354,"about_ca_system_score_codex":0.0008505936,"about_ca_system_score_gemma":0.0018349559,"threshold_uncertainty_score":0.044761717},"labels":[],"label_agreement":null},{"id":"W4256723869","doi":"10.1109/wsc.2013.6721669","title":"Utilizing simulation derived quantitative formulas for accurate excavator hauler fleet selection","year":2013,"lang":"en","type":"article","venue":"2013 Winter Simulations Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Natural Resources","funders":"","keywords":"Excavator; Earthworks; Granularity; Computer science; Selection (genetic algorithm); Discrete event simulation; Field (mathematics); Production (economics); Duration (music); Industrial engineering; Operations research; Simulation; Engineering; Civil engineering; Mathematics; Artificial intelligence","score_opus":0.051695394389955115,"score_gpt":0.292097995106046,"score_spread":0.24040260071609088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4256723869","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077948803,0.000056287507,0.9843933,0.000058885602,0.000020933448,0.000033297827,0.0002074561,0.00029136523,0.0071435533],"genre_scores_gemma":[0.5364255,0.0005711141,0.45639426,0.000081472164,0.000032898086,0.00034344077,0.00087669643,0.00049774186,0.0047768797],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993299,0.00019057369,0.0000643435,0.00007601354,0.00028153983,0.000057641344],"domain_scores_gemma":[0.99700505,0.0017073839,0.0003228417,0.00025734107,0.0006690137,0.00003836058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015588121,0.00079623505,0.0005732851,0.0013718454,0.00033430028,0.0012092561,0.0009169696,0.0004966867,0.004232504],"category_scores_gemma":[0.0076200673,0.00043227244,0.0005436287,0.0011424859,0.00040290577,0.0017126553,0.0006171012,0.00080836547,0.000792998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008152758,0.000014482654,0.00060567836,0.000039756505,0.000005411287,0.000020713755,0.000028962642,0.9573689,0.00093494874,0.023807775,0.00046569205,0.016699564],"study_design_scores_gemma":[0.0000021981627,0.000007743646,0.00012021381,0.000013074715,0.0000033928027,0.000014047496,0.000013687752,0.9904867,0.0009788335,0.0065640835,0.0017898066,0.000006298356],"about_ca_topic_score_codex":0.006826023,"about_ca_topic_score_gemma":0.0073939096,"teacher_disagreement_score":0.006826023,"about_ca_system_score_codex":0.0012483911,"about_ca_system_score_gemma":0.0012166852,"threshold_uncertainty_score":0.014159083},"labels":[],"label_agreement":null},{"id":"W4280519010","doi":"10.1007/978-981-19-0507-0_30","title":"Applications of Flow-Drilled Connections in Modular Construction","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Modular design; Engineering; Structural engineering; Drilling; Tension (geology); Shear (geology); Flow (mathematics); Modular construction; Tapping; Mechanical engineering; Engineering drawing; Computer science; Materials science; Mathematics; Geometry; Compression (physics); Composite material","score_opus":0.004694542318712294,"score_gpt":0.17888283487026085,"score_spread":0.17418829255154855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280519010","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026118232,0.012041263,0.75098705,0.00028168093,0.0006126402,0.00008032723,0.00012803025,0.0010977824,0.20865303],"genre_scores_gemma":[0.5001986,0.017902657,0.36734998,0.00014255718,0.00031069483,0.00015776421,0.00029417538,0.0003194672,0.113324046],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998354,0.000030102086,0.000008150783,0.00003403676,0.00007912289,0.000013222157],"domain_scores_gemma":[0.9998796,0.000056470508,0.00000965496,0.000025051566,0.000020243831,0.000008976936],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00026239263,0.00076871255,0.00037624582,0.0011877923,0.00040760246,0.0009491452,0.000732952,0.00079434086,0.0142810615],"category_scores_gemma":[0.0006506813,0.00048542948,0.000513287,0.0016922728,0.00082305196,0.0013103,0.001023546,0.0007249992,0.0019291772],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050736067,0.00006458021,0.00043256188,0.00042147347,0.000019140645,0.00039510822,0.00038829973,0.082908,0.023278791,0.36407125,0.0058877915,0.52208215],"study_design_scores_gemma":[0.000031497006,0.00030638208,0.0022942352,0.00047000137,0.00006325712,0.0024016153,0.00033138844,0.17431024,0.029212665,0.4234249,0.36707982,0.00007407492],"about_ca_topic_score_codex":0.00045267236,"about_ca_topic_score_gemma":0.00096297427,"teacher_disagreement_score":0.0142810615,"about_ca_system_score_codex":0.00035595658,"about_ca_system_score_gemma":0.00028133046,"threshold_uncertainty_score":0.04777491},"labels":[],"label_agreement":null},{"id":"W4280536417","doi":"10.48550/arxiv.2205.05521","title":"Comparison of Brick and Project Haystack to Support Smart Building Applications","year":2022,"lang":"en","type":"preprint","venue":"arXiv (Cornell University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Haystack; Ontology; Brick; Building automation; Computer science; Sustainability; Scalability; Architectural engineering; Engineering; Database; Data science; World Wide Web; Civil engineering","score_opus":0.07460629134241159,"score_gpt":0.2321261595624424,"score_spread":0.1575198682200308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280536417","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6238655,0.0014493738,0.25526482,0.0023666911,0.00025036995,0.0013836089,0.004711231,0.019691097,0.09101732],"genre_scores_gemma":[0.6153457,0.0014001863,0.34749722,0.00061044726,0.000033974477,0.0006891251,0.016715635,0.0033541955,0.014353472],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99197716,0.001749734,0.0006836672,0.00051763316,0.0045730327,0.0004987807],"domain_scores_gemma":[0.99032205,0.0032347818,0.0005108576,0.0027081189,0.0029008014,0.0003235027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00894043,0.00088943145,0.00060114486,0.0023946227,0.000810104,0.0030360492,0.0018828292,0.0011363432,0.004908453],"category_scores_gemma":[0.022099633,0.000665466,0.0010469551,0.002237818,0.0010764735,0.009842939,0.0051160413,0.001687296,0.0017150823],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0043227905,0.0016502687,0.027213588,0.005754382,0.00049913255,0.00084083073,0.01171658,0.06523598,0.07198629,0.12627947,0.042045265,0.64245546],"study_design_scores_gemma":[0.00050475966,0.0030084364,0.05406256,0.002352571,0.00065586605,0.0022706322,0.016439145,0.22865455,0.07961852,0.0502206,0.5616401,0.0005722623],"about_ca_topic_score_codex":0.007956235,"about_ca_topic_score_gemma":0.012573335,"teacher_disagreement_score":0.00894043,"about_ca_system_score_codex":0.0015488376,"about_ca_system_score_gemma":0.002787578,"threshold_uncertainty_score":0.0472821},"labels":[],"label_agreement":null},{"id":"W4280569001","doi":"10.3390/app12105037","title":"Cybersecurity Vulnerabilities in Off-Site Construction","year":2022,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Computer security; Internet of Things; Construction industry; Industry 4.0; Work (physics); Critical infrastructure; Computer science; Risk analysis (engineering); Business; Engineering; Construction engineering","score_opus":0.008351349716872505,"score_gpt":0.2004828659685329,"score_spread":0.1921315162516604,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280569001","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28235167,0.19855203,0.13782641,0.033628527,0.0010533637,0.0003314202,0.00037007785,0.00084618555,0.34504035],"genre_scores_gemma":[0.8806286,0.08601135,0.02029304,0.0022143018,0.00023203061,0.00009878536,0.00021758855,0.00008580312,0.010218537],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9969812,0.0007396456,0.00018251919,0.00022118399,0.0015231939,0.00035225978],"domain_scores_gemma":[0.9954065,0.0023913423,0.0008364155,0.0004964749,0.0007560612,0.00011311748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022102061,0.0005565266,0.00030989645,0.003920097,0.0012874526,0.003818778,0.0007309814,0.0019093052,0.0020744128],"category_scores_gemma":[0.004137287,0.00033574007,0.0005107263,0.0025518152,0.0031148011,0.0064787907,0.0031428507,0.0017888943,0.00043719562],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051171315,0.0001096058,0.016031204,0.0018343346,0.0000812693,0.0017620529,0.0068068476,0.00842023,0.002600732,0.59143806,0.014106618,0.35675785],"study_design_scores_gemma":[0.000008769328,0.0001857477,0.020833358,0.008225112,0.00020020102,0.009445894,0.014018367,0.012574817,0.011093016,0.34202957,0.58121175,0.00017340657],"about_ca_topic_score_codex":0.0016217567,"about_ca_topic_score_gemma":0.001740189,"teacher_disagreement_score":0.003920097,"about_ca_system_score_codex":0.0018463068,"about_ca_system_score_gemma":0.0016708426,"threshold_uncertainty_score":0.013396025},"labels":[],"label_agreement":null},{"id":"W4280619952","doi":"10.48550/arxiv.2205.07636","title":"A review of ontologies for smart and continuous commissioning","year":2022,"lang":"en","type":"review","venue":"arXiv (Cornell University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Computer science; Ontology; Identification (biology); Key (lock); Data science; Domain (mathematical analysis); Readability","score_opus":0.10428019026869542,"score_gpt":0.21526201137347828,"score_spread":0.11098182110478286,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280619952","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00017382715,0.99194044,0.001820729,0.0010474818,0.0004134693,0.000016911385,0.00008422599,0.000023577231,0.0044793193],"genre_scores_gemma":[0.0016625243,0.99451506,0.0024021927,0.000407566,0.00017777279,0.000023157005,0.00013537519,0.000012134901,0.00066431024],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976857,0.0005161403,0.00050426973,0.0002767168,0.00091249816,0.0001047142],"domain_scores_gemma":[0.9953557,0.002813489,0.00046541035,0.00018818658,0.0010773101,0.000100029625],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036315187,0.0012733211,0.0014946943,0.009994425,0.00077131344,0.0027305628,0.0017410318,0.0017806828,0.004967083],"category_scores_gemma":[0.006789913,0.0007293299,0.0011661723,0.013910429,0.0016775085,0.006174382,0.001812858,0.0021225752,0.0021123649],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002887868,0.000054687094,0.0002506439,0.038518444,0.000102384205,0.00013429315,0.00043579005,0.0007749377,0.00073633686,0.049697276,0.042934213,0.8663321],"study_design_scores_gemma":[0.0000030809895,0.000015365113,0.00042219143,0.012679756,0.000072200746,0.00027510402,0.0001639677,0.00012962616,0.0002828246,0.005863879,0.9800751,0.000016954335],"about_ca_topic_score_codex":0.006460437,"about_ca_topic_score_gemma":0.007079254,"teacher_disagreement_score":0.009994425,"about_ca_system_score_codex":0.0027630567,"about_ca_system_score_gemma":0.007132439,"threshold_uncertainty_score":0.020047545},"labels":[],"label_agreement":null},{"id":"W4280642564","doi":"10.3390/buildings12050672","title":"Assembly Solution for Modular Buildings: Development of an Automated Connecting Device for Light-Framed Structures","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Engineering; Prefabrication; Rapid prototyping; Process (computing); New product development; Timeline; Manufacturing engineering; Systems engineering; Mechanical engineering; Computer science; Civil engineering","score_opus":0.013916210474353423,"score_gpt":0.258282419130682,"score_spread":0.24436620865632858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4280642564","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.059100673,0.00011792942,0.9283617,0.00006326717,0.00009724414,0.00030447348,0.00014389306,0.0051804124,0.006630387],"genre_scores_gemma":[0.225971,0.00011168091,0.761605,0.000055867273,0.000023004804,0.00028742503,0.00035079443,0.0003711679,0.011224015],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99955124,0.000051014496,0.000028113083,0.00006699357,0.0002613513,0.000041331085],"domain_scores_gemma":[0.9997137,0.00005936498,0.000044009823,0.00006860657,0.00009131718,0.00002301594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043150355,0.0006957289,0.0003060852,0.00078235066,0.00032984442,0.0005363978,0.00095979444,0.0005199899,0.0048357667],"category_scores_gemma":[0.00065476116,0.00040508228,0.00039039782,0.00033544446,0.00028337067,0.00066120795,0.0006479019,0.0005018605,0.0015638712],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001562871,0.00034995118,0.0019299424,0.00040802523,0.00002698894,0.00051325833,0.0005978888,0.016356243,0.5814582,0.013476047,0.0053970288,0.37933013],"study_design_scores_gemma":[0.000121904945,0.0019324971,0.007017916,0.00008431339,0.00007519534,0.0025354563,0.00019897638,0.21540876,0.62065434,0.0021221717,0.14972278,0.00012567367],"about_ca_topic_score_codex":0.00043359475,"about_ca_topic_score_gemma":0.00064030994,"teacher_disagreement_score":0.0048357667,"about_ca_system_score_codex":0.0002536918,"about_ca_system_score_gemma":0.00051511417,"threshold_uncertainty_score":0.016177237},"labels":[],"label_agreement":null},{"id":"W4281479269","doi":"10.1007/978-981-19-0968-9_23","title":"Systematic Literature Review on the Combination of Digital Fabrication, BIM and Off-Site Manufacturing in Construction—A Research Road Map","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Productivity; Context (archaeology); Engineering; Construction industry; Construction engineering; Manufacturing engineering; Operations management; Geography","score_opus":0.01074992711317792,"score_gpt":0.21911182960659265,"score_spread":0.2083619024934147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281479269","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023954557,0.9951527,0.00042501444,0.0004148389,0.00015502113,0.00050871744,0.00046020892,0.00000934816,0.00047870565],"genre_scores_gemma":[0.02011377,0.9748594,0.0023126127,0.0010696569,0.00011263982,0.0008487905,0.00044969263,0.000008200268,0.00022518955],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.98383373,0.0059947968,0.0062821875,0.0011209506,0.0023990863,0.0003691616],"domain_scores_gemma":[0.9432953,0.041249406,0.008756857,0.0011071886,0.0049697114,0.00062148506],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.016056312,0.0015245634,0.0059546754,0.02412396,0.00084420067,0.0039229784,0.0020816154,0.0021790834,0.0051250807],"category_scores_gemma":[0.048731517,0.0014069879,0.0069154305,0.01779121,0.0017637005,0.004224938,0.0036078515,0.0012924414,0.000492451],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020079922,0.000042713455,0.0013222803,0.92699504,0.0079261195,0.00018440365,0.0004095054,0.00012350263,0.00039775198,0.0005868725,0.0018212071,0.059989743],"study_design_scores_gemma":[0.00017415662,0.00026907,0.0045439187,0.93212056,0.039944723,0.0004387135,0.00096238294,0.00007593668,0.00022275631,0.00056875224,0.02063711,0.000041977913],"about_ca_topic_score_codex":0.008706198,"about_ca_topic_score_gemma":0.04557575,"teacher_disagreement_score":0.02412396,"about_ca_system_score_codex":0.0039607272,"about_ca_system_score_gemma":0.022777457,"threshold_uncertainty_score":0.08491492},"labels":[],"label_agreement":null},{"id":"W4281482839","doi":"10.1007/978-981-19-0968-9_39","title":"Agent-Based Modelling as a Decision-Support System for Project Delivery Methods","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Integrated project delivery; Schedule; Process (computing); Futures contract; Selection (genetic algorithm); Computer science; Risk analysis (engineering); Operations research; Engineering; Sample (material); Decision support system; Project management; Process management; Systems engineering; Business; Data mining; Artificial intelligence","score_opus":0.021155544105486895,"score_gpt":0.25343638211494945,"score_spread":0.23228083800946256,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281482839","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0047456203,0.0002719898,0.98471004,0.00026808828,0.00008838439,0.000090892034,0.00017690344,0.0024470212,0.0072010043],"genre_scores_gemma":[0.1887733,0.0008762586,0.7966638,0.0001552422,0.000068228546,0.0004580039,0.0007479182,0.00045557998,0.011801733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99894065,0.00041654686,0.00012019246,0.00012421347,0.00035336954,0.000045112425],"domain_scores_gemma":[0.99876034,0.0008216455,0.000060187263,0.00012822892,0.00016824313,0.000061333914],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001657134,0.000804974,0.00087415817,0.0008424183,0.00067367894,0.003896264,0.0018368599,0.0015669925,0.0072741765],"category_scores_gemma":[0.0028367026,0.0006919437,0.0008190782,0.00091374747,0.0006161254,0.0022313963,0.0015024615,0.0014415667,0.0018186434],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032192504,0.00035974482,0.00096492853,0.00047869826,0.0001630071,0.00040979905,0.00074757496,0.58205634,0.010533377,0.16197015,0.012445012,0.22954942],"study_design_scores_gemma":[0.000029419154,0.000024468549,0.00008858097,0.000047540256,0.000036995873,0.00004441232,0.000030055407,0.9494412,0.0025466497,0.0253106,0.022378271,0.000021860853],"about_ca_topic_score_codex":0.0043967366,"about_ca_topic_score_gemma":0.004523757,"teacher_disagreement_score":0.0072741765,"about_ca_system_score_codex":0.0009369678,"about_ca_system_score_gemma":0.0011818109,"threshold_uncertainty_score":0.02433455},"labels":[],"label_agreement":null},{"id":"W4281485011","doi":"10.1007/978-981-19-0968-9_28","title":"An Overview of Modeling Spatial Relationships in Site Layout Planning Literature","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Closeness; Computer science; Field (mathematics); Spatial planning; Process (computing); Plan (archaeology); Operations research; Management science; Geography; Engineering; Environmental planning; Mathematics","score_opus":0.027819058922330303,"score_gpt":0.23448306876346958,"score_spread":0.20666400984113928,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281485011","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030070937,0.11130286,0.8049366,0.0015818035,0.0007070553,0.00010921305,0.0012593762,0.0013140452,0.07578198],"genre_scores_gemma":[0.036263224,0.20667395,0.71310997,0.0006256096,0.00070820743,0.00026409008,0.0031706167,0.00061644247,0.03856791],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995499,0.00010465824,0.00004583601,0.00010613538,0.00016553268,0.000027823702],"domain_scores_gemma":[0.9995473,0.00024146643,0.000027925338,0.00005290572,0.0001105302,0.000019895653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071968965,0.0013117514,0.0008873208,0.0032567035,0.00076143176,0.0034257632,0.0023160197,0.0011610028,0.015003385],"category_scores_gemma":[0.0013109623,0.0010599626,0.001524189,0.010836768,0.0006211261,0.0041257683,0.0012024415,0.0014042377,0.0056698113],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016505863,0.00009870696,0.00095031626,0.0019829962,0.00006284136,0.00028460237,0.0003448962,0.124855615,0.0011140524,0.328874,0.03704751,0.50436807],"study_design_scores_gemma":[0.0000074073955,0.00003575991,0.00071932154,0.001304163,0.000070103495,0.0005952651,0.0002596198,0.12252189,0.0010841954,0.2658211,0.60753834,0.000042899614],"about_ca_topic_score_codex":0.0088911075,"about_ca_topic_score_gemma":0.016862286,"teacher_disagreement_score":0.015003385,"about_ca_system_score_codex":0.0015433112,"about_ca_system_score_gemma":0.0015704399,"threshold_uncertainty_score":0.050191343},"labels":[],"label_agreement":null},{"id":"W4281486544","doi":"10.1007/978-981-19-0968-9_6","title":"Integrating Building Information Modeling (BIM) and Sustainability Indicators and Criteria to Select Associated Construction Method at the Conceptual Design Stage of Buildings","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Sustainability; Engineering; Systems engineering; Sustainable design; Conceptual design; Architectural engineering; Certification; Modular design; Built environment; Process (computing); Construction engineering; Computer science; Civil engineering; Operations management","score_opus":0.008902102324899722,"score_gpt":0.22904948708594366,"score_spread":0.22014738476104395,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281486544","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029987147,0.0031428526,0.7941275,0.0008020238,0.00014372576,0.00021752233,0.00037429715,0.0009161491,0.17028876],"genre_scores_gemma":[0.15982139,0.0020107157,0.8101988,0.0001303838,0.00003146994,0.00017419732,0.0011889687,0.00042231867,0.026021786],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981522,0.00058888976,0.0000946701,0.000111176705,0.0009589586,0.00009407062],"domain_scores_gemma":[0.9992173,0.00038972293,0.00005692216,0.000076447395,0.00022494524,0.000034669618],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019774456,0.0006820656,0.0004314219,0.0031171783,0.0004903098,0.0041678906,0.0008703579,0.00062478485,0.0038047961],"category_scores_gemma":[0.0026937362,0.00042310462,0.000547544,0.004671929,0.00068360305,0.0028381718,0.0017768922,0.0009776987,0.0012997005],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037971855,0.00017065556,0.0030122253,0.00047348975,0.00003399156,0.0001101314,0.0013867645,0.015008809,0.006899479,0.1873917,0.010322536,0.7751522],"study_design_scores_gemma":[0.000018565193,0.00030575847,0.017550075,0.001577445,0.00018101845,0.0008311571,0.004440729,0.20864849,0.038843546,0.31938297,0.40806663,0.00015367348],"about_ca_topic_score_codex":0.001744272,"about_ca_topic_score_gemma":0.005660853,"teacher_disagreement_score":0.0041678906,"about_ca_system_score_codex":0.0011597831,"about_ca_system_score_gemma":0.0017963656,"threshold_uncertainty_score":0.0127283335},"labels":[],"label_agreement":null},{"id":"W4281489976","doi":"10.1007/978-981-19-0968-9_12","title":"From Collaborative BIM to Value-Driven Asset Management: A Case Study","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Asset management; Building information modeling; Asset (computer security); Business; Process management; Portfolio; IT asset management; Knowledge management; Process (computing); Value (mathematics); Computer science; Operations management; Finance; Engineering; Computer security","score_opus":0.0072846678947106665,"score_gpt":0.21134138377888867,"score_spread":0.204056715884178,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281489976","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7187566,0.0011450791,0.080533616,0.003215122,0.00011040672,0.0004292941,0.00023139914,0.00027871924,0.19529973],"genre_scores_gemma":[0.95123255,0.0005520749,0.033157445,0.00015425218,0.000014375533,0.0001153896,0.00009561345,0.00006184806,0.014616329],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9968291,0.0019493514,0.00007965821,0.00017558172,0.0006474527,0.0003188234],"domain_scores_gemma":[0.9961389,0.002687627,0.00014663546,0.0004899908,0.00027889802,0.0002579626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003622713,0.00048624148,0.00033888654,0.0009088455,0.0028307885,0.0049462393,0.0017358515,0.0031778852,0.005678711],"category_scores_gemma":[0.005664929,0.0003640939,0.0004175774,0.0025504914,0.0020574715,0.003517816,0.0038168482,0.0014211525,0.0010242518],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009047972,0.0061150314,0.019144269,0.00088326633,0.00010409039,0.02880133,0.08222635,0.056994077,0.008259296,0.29613075,0.02677824,0.47365853],"study_design_scores_gemma":[0.000511434,0.0023995335,0.017351674,0.0011497041,0.00019274598,0.015762087,0.1868347,0.19354084,0.02178463,0.16169874,0.39856422,0.0002096906],"about_ca_topic_score_codex":0.0059559452,"about_ca_topic_score_gemma":0.01042725,"teacher_disagreement_score":0.0059559452,"about_ca_system_score_codex":0.0017101804,"about_ca_system_score_gemma":0.0016283325,"threshold_uncertainty_score":0.01915896},"labels":[],"label_agreement":null},{"id":"W4281490267","doi":"10.1007/978-981-19-0968-9","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2021","year":2022,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of Regina; Western University; Concordia University; Okanagan University College; University of Waterloo","funders":"","keywords":"Engineering ethics; Political science; Engineering; Civil society; Library science; Law; Computer science","score_opus":0.005025023668963167,"score_gpt":0.1690921060614327,"score_spread":0.16406708239246953,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281490267","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029895387,0.0121633345,0.0022124446,0.026098682,0.047579367,0.00013344528,0.0026953127,0.00044748114,0.90568036],"genre_scores_gemma":[0.0034704146,0.0033779591,0.00054296147,0.00048347935,0.0006945153,0.000019992798,0.0009234786,0.000106389,0.9903807],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99845445,0.000081417355,0.000025134037,0.00008990258,0.0011119669,0.00023719452],"domain_scores_gemma":[0.99798214,0.000057591005,0.00001954868,0.000050733423,0.0014390607,0.00045095774],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015644922,0.0011253688,0.0007472987,0.0018547059,0.0035742042,0.0057183355,0.0012510337,0.0018338696,0.2469943],"category_scores_gemma":[0.0014207804,0.00041587872,0.00048548402,0.002272081,0.0012491827,0.0012239657,0.0019307376,0.0017284318,0.07597203],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016028183,0.00001893057,0.00014370895,0.0000376339,0.0000024069884,0.00002763301,0.000039878152,0.00009695997,0.00017611636,0.001987059,0.9684208,0.029032864],"study_design_scores_gemma":[0.0000021874819,0.000003483825,0.00047357116,0.000030673964,0.0000021633086,0.000012052431,0.000108726665,0.00010367264,0.00009282854,0.0003121356,0.9988537,0.00000491269],"about_ca_topic_score_codex":0.5346932,"about_ca_topic_score_gemma":0.798119,"teacher_disagreement_score":0.5346932,"about_ca_system_score_codex":0.009575159,"about_ca_system_score_gemma":0.030112576,"threshold_uncertainty_score":0.9360942},"labels":[],"label_agreement":null},{"id":"W4281659795","doi":"10.1061/(asce)cp.1943-5487.0001023","title":"Physical Distancing Analytics for Construction Planning Using 4D BIM","year":2022,"lang":"en","type":"article","venue":"Journal of Computing in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Schedule; Computer science; Social distance; Building information modeling; Facility management; Relocation; Risk analysis (engineering); Operations research; Simulation; Engineering; Coronavirus disease 2019 (COVID-19); Operations management; Scheduling (production processes); Business; Artificial intelligence; Robot","score_opus":0.01325730190124799,"score_gpt":0.2387156639985258,"score_spread":0.22545836209727782,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4281659795","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0122115305,0.000102516824,0.9761361,0.00018925939,0.00003175036,0.00013314816,0.00084678,0.006158268,0.004190674],"genre_scores_gemma":[0.27464786,0.00030376582,0.72015846,0.00006832316,0.000016970072,0.0004010122,0.0021607263,0.00067373697,0.0015691462],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992224,0.00017809971,0.000058874495,0.00012589585,0.00034839232,0.00006637871],"domain_scores_gemma":[0.99899095,0.0004910824,0.00010443725,0.0001811896,0.00016809719,0.00006416924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010915659,0.0014489051,0.00088968145,0.0023024948,0.000846928,0.002675332,0.0022009832,0.0011706689,0.0072882944],"category_scores_gemma":[0.002899603,0.0011251898,0.0018356451,0.001614743,0.000886823,0.0016992253,0.0032712,0.0011944125,0.0014466116],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006431418,0.00007203321,0.001821436,0.00015579842,0.00003537322,0.0001691771,0.00030931723,0.92856973,0.002088886,0.013351817,0.0017174362,0.051644687],"study_design_scores_gemma":[0.000007465343,0.000014991661,0.00019394814,0.000020256886,0.0000060093425,0.00002755706,0.000069580245,0.98885185,0.0010766515,0.0063922624,0.0033264866,0.000012993047],"about_ca_topic_score_codex":0.01108681,"about_ca_topic_score_gemma":0.0153246205,"teacher_disagreement_score":0.01108681,"about_ca_system_score_codex":0.0012808851,"about_ca_system_score_gemma":0.0020056206,"threshold_uncertainty_score":0.024381816},"labels":[],"label_agreement":null},{"id":"W4282564378","doi":"10.1108/ecam-02-2022-0170","title":"The latest operational, contractual and organizational trends in IPD literature: review and future directions","year":2022,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal","funders":"","keywords":"Originality; Context (archaeology); Thematic analysis; Systematic review; Domain (mathematical analysis); Knowledge management; Management science; Computer science; Data science; Political science; Qualitative research; Engineering; Sociology; Social science; Geography; MEDLINE","score_opus":0.002117895599477319,"score_gpt":0.17350870817634415,"score_spread":0.17139081257686684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4282564378","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00074636727,0.99598396,0.00037363553,0.0018392309,0.00028555,0.000025973166,0.00006331824,0.0000073480815,0.00067452877],"genre_scores_gemma":[0.006330235,0.9915039,0.00089498557,0.00073405926,0.00025888672,0.00006910756,0.00007913812,0.0000055895325,0.00012400997],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99085,0.002871148,0.0027537586,0.0010132443,0.0021374421,0.0003744231],"domain_scores_gemma":[0.89811105,0.083106235,0.006982751,0.001284278,0.009733294,0.00078229734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014701437,0.0008863785,0.002217586,0.020100594,0.0012827299,0.0060604103,0.001737906,0.0027015551,0.0038972597],"category_scores_gemma":[0.04611504,0.0008217832,0.002488283,0.024266893,0.0024583053,0.0077257683,0.002283772,0.0023983526,0.000654375],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000121530524,0.00007967278,0.0025652635,0.34170684,0.0005370633,0.0003851275,0.0038652928,0.0004260762,0.00047181814,0.012124338,0.011911765,0.62580526],"study_design_scores_gemma":[0.000030526237,0.00015580551,0.008347881,0.6144457,0.0031694002,0.0015922108,0.00944779,0.00044148305,0.000570876,0.008122258,0.35356975,0.00010637849],"about_ca_topic_score_codex":0.007786952,"about_ca_topic_score_gemma":0.014549539,"teacher_disagreement_score":0.020100594,"about_ca_system_score_codex":0.0055699036,"about_ca_system_score_gemma":0.021603668,"threshold_uncertainty_score":0.07774961},"labels":[],"label_agreement":null},{"id":"W4282968354","doi":"10.1016/j.autcon.2022.104394","title":"Tolerance management domain model for semantic enrichment of BIMs","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"Natural Sciences and Engineering Research Council of Canada; Danmarks Frie Forskningsfond; Teknologi og Produktion, Det Frie Forskningsråd","keywords":"Computer science; Domain (mathematical analysis); Domain model; Natural language processing; Software engineering; Mathematics; Domain knowledge","score_opus":0.007508623054453583,"score_gpt":0.21126244725183455,"score_spread":0.20375382419738097,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4282968354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009161024,0.00016945924,0.9750308,0.00026226894,0.000056584566,0.0001279282,0.0008400593,0.0022022468,0.012149644],"genre_scores_gemma":[0.2573234,0.00053812703,0.7237712,0.0003011221,0.000056321078,0.00036593035,0.005474929,0.000534901,0.011634108],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9986136,0.00030241132,0.0001690592,0.00022202056,0.000536741,0.00015618655],"domain_scores_gemma":[0.99914646,0.0001581872,0.00007402992,0.00028895104,0.00028675215,0.00004554844],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001319499,0.0006585694,0.0005480706,0.0024204405,0.0007627586,0.002581755,0.0014583861,0.00096252386,0.003509295],"category_scores_gemma":[0.0022859776,0.00038365205,0.0015058331,0.002544799,0.0006588315,0.0030630105,0.0025787826,0.0013390381,0.0014484375],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020976986,0.00028304665,0.0022692208,0.00043414533,0.00011573262,0.0007749693,0.0009182236,0.12288386,0.010319771,0.683943,0.01462804,0.16322023],"study_design_scores_gemma":[0.000035043406,0.000053075793,0.000773982,0.00018775182,0.00015937543,0.00047979626,0.00037887687,0.6294114,0.014275311,0.22327192,0.13091907,0.00005434399],"about_ca_topic_score_codex":0.004862385,"about_ca_topic_score_gemma":0.007980962,"teacher_disagreement_score":0.004862385,"about_ca_system_score_codex":0.0009158354,"about_ca_system_score_gemma":0.0015688332,"threshold_uncertainty_score":0.011739731},"labels":[],"label_agreement":null},{"id":"W4283260199","doi":"10.1016/j.autcon.2022.104441","title":"Learning-driven construction productivity prediction for prefabricated external insulation wall system","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Institute for Advancement of Technology; Ministry of Trade, Industry and Energy","keywords":"Productivity; Engineering; Learning effect; Construction industry; Economic shortage; Industrial engineering; Computer science; Machine learning; Artificial intelligence; Construction engineering","score_opus":0.007856629503674932,"score_gpt":0.19978835231756842,"score_spread":0.19193172281389348,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283260199","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8886032,0.00021684132,0.10723382,0.00010989141,0.00003929877,0.00003879325,0.0006590687,0.0009003573,0.0021987965],"genre_scores_gemma":[0.9952271,0.000025351686,0.003681922,0.000008002667,0.000004119585,0.000013683228,0.00043142855,0.00001243657,0.0005958741],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978155,0.000025243065,0.000009207092,0.00006570986,0.00005736002,0.000061007675],"domain_scores_gemma":[0.9993268,0.00029914296,0.00007883055,0.000045019817,0.00020476067,0.00004539966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041042618,0.0006940862,0.00048526845,0.0006937016,0.00021533528,0.0004718825,0.0005291593,0.0005444187,0.001649428],"category_scores_gemma":[0.0013680377,0.00021871035,0.0004821587,0.00045968915,0.00018190137,0.0004043986,0.0003660446,0.0005046899,0.00045144552],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025935276,0.00018466226,0.010963966,0.00005384962,0.000026476999,0.00009103947,0.000019824682,0.942536,0.0030463114,0.00024963627,0.00071023667,0.041858587],"study_design_scores_gemma":[0.0000023005814,0.000018999719,0.0017421975,0.0000011877621,0.0000028887778,0.000004693338,0.000003524997,0.9974463,0.0006752454,0.000066997425,0.000033647513,0.0000019856855],"about_ca_topic_score_codex":0.013174541,"about_ca_topic_score_gemma":0.009079741,"teacher_disagreement_score":0.013174541,"about_ca_system_score_codex":0.0005611315,"about_ca_system_score_gemma":0.00048471274,"threshold_uncertainty_score":0.026195705},"labels":[],"label_agreement":null},{"id":"W4283367604","doi":"10.1061/(asce)co.1943-7862.0002330","title":"Implementing Construction Planning and Control Software: A Specialized Contractor Perspective","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Control (management); Software; Computer science; Order (exchange); Quality (philosophy); Process management; Digital transformation; Complementarity (molecular biology); Perspective (graphical); Knowledge management; Engineering management; Business; Engineering","score_opus":0.004252576246389947,"score_gpt":0.19895317556141334,"score_spread":0.1947005993150234,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283367604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5543852,0.0022338831,0.17643923,0.021719206,0.00015924752,0.001088768,0.00007929356,0.00028840182,0.2436067],"genre_scores_gemma":[0.9473062,0.0019606906,0.035016667,0.001166471,0.000048951373,0.00017679922,0.00007818588,0.000080040016,0.01416603],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.97389936,0.015776046,0.0008649702,0.0011090222,0.005485369,0.0028652307],"domain_scores_gemma":[0.9810946,0.0089578815,0.0011739851,0.0019133835,0.0036005795,0.003259501],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021518815,0.0005925173,0.00029678896,0.0022164918,0.0052655856,0.011692166,0.0024802585,0.003031509,0.005200265],"category_scores_gemma":[0.017035278,0.0005410799,0.000349061,0.001990422,0.010133631,0.008656626,0.00520647,0.0032024847,0.0007505453],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018286849,0.0015816313,0.022314781,0.00094344775,0.00006480212,0.0023449338,0.29222777,0.009774118,0.008208753,0.3600819,0.009473876,0.2928011],"study_design_scores_gemma":[0.000075841686,0.0021841282,0.017657584,0.0025238213,0.000065774744,0.0025720522,0.54169995,0.028601762,0.009360381,0.043829937,0.35124916,0.00017966772],"about_ca_topic_score_codex":0.012088444,"about_ca_topic_score_gemma":0.012782537,"teacher_disagreement_score":0.021518815,"about_ca_system_score_codex":0.008399976,"about_ca_system_score_gemma":0.019847937,"threshold_uncertainty_score":0.113803685},"labels":[],"label_agreement":null},{"id":"W4283641014","doi":"10.3390/jrfm15070282","title":"Identification of Risk Factors in Business Valuation","year":2022,"lang":"en","type":"article","venue":"Journal of risk and financial management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Valuation (finance); Business valuation; Actuarial science; Income approach; Risk analysis (engineering); Business; Pre-money valuation; Market value; Risk assessment; Computer science; Finance","score_opus":0.006847556807651239,"score_gpt":0.19631831266724767,"score_spread":0.18947075585959644,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283641014","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10916782,0.0020736407,0.8538093,0.0011370071,0.00011226449,0.00077913626,0.0001561861,0.00017807914,0.032586545],"genre_scores_gemma":[0.8291274,0.0016432877,0.16573943,0.00005149346,0.00005970533,0.00029816103,0.0001241005,0.000041899,0.0029145463],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99293363,0.0026280177,0.0004829791,0.00044079943,0.0030691414,0.00044551716],"domain_scores_gemma":[0.98644954,0.008866863,0.0015300428,0.0005658099,0.002356958,0.0002308448],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008325072,0.0012858663,0.0010690117,0.0055230753,0.0014226916,0.004992907,0.000986378,0.0009955064,0.0034714276],"category_scores_gemma":[0.024864407,0.0005763565,0.0013117109,0.004000151,0.0017526037,0.0048400024,0.0023351305,0.0018668124,0.00034831476],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002843377,0.0003600268,0.036490254,0.0010708155,0.0003115019,0.001452309,0.004021968,0.21960625,0.005721071,0.42501122,0.0023769578,0.30329323],"study_design_scores_gemma":[0.00003653068,0.0003126216,0.02371413,0.00090352714,0.00020813475,0.00076447264,0.0045529422,0.514846,0.004586788,0.4310401,0.018765952,0.00026871648],"about_ca_topic_score_codex":0.0044436497,"about_ca_topic_score_gemma":0.0030011467,"teacher_disagreement_score":0.008325072,"about_ca_system_score_codex":0.0026278158,"about_ca_system_score_gemma":0.003237086,"threshold_uncertainty_score":0.044027686},"labels":[],"label_agreement":null},{"id":"W4283715309","doi":"10.1139/cjce-2021-0649","title":"Knowing what is going on—a smart contract for modular construction","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Enforcement; Benchmark (surveying); Documentation; Computer science; Incentive; Reliability (semiconductor); Unit (ring theory); Schedule; Contract management; Productivity; Operations research; Engineering management; Engineering; Business; Operating system","score_opus":0.006076471834522953,"score_gpt":0.1719357941967915,"score_spread":0.16585932236226855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4283715309","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21245699,0.00028108663,0.7503881,0.0012712068,0.00019507269,0.0011358958,0.00041481105,0.014840063,0.01901679],"genre_scores_gemma":[0.76278776,0.0001420066,0.22900058,0.00024636002,0.00004234816,0.00031387547,0.00043933088,0.00056011905,0.0064676283],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99419373,0.0015713993,0.0005030974,0.0007422078,0.0026524612,0.0003371549],"domain_scores_gemma":[0.9895431,0.0035618653,0.0022440676,0.0024444065,0.0016020447,0.00060446496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055197626,0.0006742143,0.00056155183,0.00092139724,0.0009432929,0.0018637202,0.001569841,0.0009227976,0.004979807],"category_scores_gemma":[0.015748776,0.000474118,0.00039830364,0.0005008347,0.0009998613,0.0031332448,0.001967503,0.0013090096,0.0016688204],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015941772,0.0009543695,0.03474435,0.0005884045,0.00008851991,0.0011551346,0.002486096,0.054844733,0.059965186,0.03865393,0.016996609,0.7879285],"study_design_scores_gemma":[0.00013806061,0.0008256584,0.020229524,0.00030730825,0.00009293062,0.0017936367,0.00087110826,0.7991549,0.07159983,0.025287416,0.07938168,0.00031792652],"about_ca_topic_score_codex":0.0018403147,"about_ca_topic_score_gemma":0.0022803317,"teacher_disagreement_score":0.0055197626,"about_ca_system_score_codex":0.0006936491,"about_ca_system_score_gemma":0.0021611268,"threshold_uncertainty_score":0.029191673},"labels":[],"label_agreement":null},{"id":"W4284681806","doi":"10.3390/buildings12070955","title":"Mass Customization of Housing: A Framework for Harmonizing Individual Needs with Factory Produced Housing","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":18,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Mass customization; Flexibility (engineering); Agile software development; Personalization; Pace; Process (computing); Process management; Prefabrication; Housing industry; Production (economics); Factory (object-oriented programming); Computer science; Engineering; Systems engineering; Architectural engineering; Risk analysis (engineering); Manufacturing engineering; Business; Software engineering; World Wide Web","score_opus":0.025925038147180016,"score_gpt":0.21725381853999992,"score_spread":0.19132878039281992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284681806","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021751566,0.00085214316,0.76897526,0.007630146,0.0001517937,0.00052447774,0.00011024592,0.00037630802,0.19962803],"genre_scores_gemma":[0.48345336,0.0010894978,0.49365282,0.0006412308,0.00009494737,0.0009153063,0.00021253253,0.00021595974,0.019724326],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9953738,0.002735743,0.00021397487,0.00059072947,0.00071523414,0.00037055553],"domain_scores_gemma":[0.9980598,0.00078463467,0.00021147307,0.000457772,0.00027764757,0.00020861505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006528305,0.0009515655,0.00039280756,0.002572343,0.0027929526,0.007938749,0.0030815087,0.0029135535,0.0067938594],"category_scores_gemma":[0.004376405,0.0005974942,0.00085248175,0.0018772627,0.01718058,0.009361947,0.00847161,0.002277464,0.001004859],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000074701034,0.00003186531,0.0004338572,0.00006343438,0.0000049157065,0.00016979872,0.007393936,0.0016954201,0.00048865244,0.97674745,0.0007418951,0.012221281],"study_design_scores_gemma":[0.000017386445,0.00009494592,0.0017874757,0.0005003594,0.0000333118,0.00061024714,0.019216668,0.022015544,0.001301081,0.7422021,0.21217172,0.00004917534],"about_ca_topic_score_codex":0.004291353,"about_ca_topic_score_gemma":0.0069792983,"teacher_disagreement_score":0.007938749,"about_ca_system_score_codex":0.004622604,"about_ca_system_score_gemma":0.004646724,"threshold_uncertainty_score":0.034525394},"labels":[],"label_agreement":null},{"id":"W4284686519","doi":"10.3390/buildings12070960","title":"A Predictive Analytics Framework for Mobile Crane Configuration Selection in Heavy Industrial Construction Projects","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Heuristic; Analytics; Predictive analytics; Selection (genetic algorithm); Artificial neural network; Computer science; Variety (cybernetics); Engineering; Project management; Set (abstract data type); Industrial engineering; Systems engineering; Machine learning; Data mining; Artificial intelligence","score_opus":0.018047240846257816,"score_gpt":0.23900273816018433,"score_spread":0.22095549731392652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284686519","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037083402,0.0004572041,0.956193,0.00049279036,0.000037401645,0.00010800018,0.00038634034,0.0009791311,0.0042627263],"genre_scores_gemma":[0.84795296,0.00054124545,0.14897151,0.000077873985,0.00004911362,0.00019204641,0.0006920915,0.00005197549,0.0014711178],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992828,0.00018461025,0.000055168577,0.00015998197,0.00022718756,0.000090301764],"domain_scores_gemma":[0.9990244,0.00045755765,0.00017195588,0.00004802265,0.00024514485,0.000052966167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014715679,0.0010198108,0.00072553515,0.002207995,0.000536608,0.0016506212,0.0012858099,0.00070920284,0.0015206845],"category_scores_gemma":[0.002822892,0.00040466644,0.0007698166,0.001650971,0.0005873344,0.0012181365,0.0009959267,0.0009258077,0.00023042235],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029925692,0.00007378754,0.0024375855,0.000049545793,0.000031122367,0.000107372216,0.00008071273,0.9553574,0.00053852197,0.009788112,0.00073019334,0.030775784],"study_design_scores_gemma":[0.0000014863909,0.0000075882426,0.00023667509,0.0000074505047,0.000003975566,0.00000816141,0.000016296213,0.99698275,0.000109536486,0.0023763485,0.00024562178,0.000004078847],"about_ca_topic_score_codex":0.024542395,"about_ca_topic_score_gemma":0.023928028,"teacher_disagreement_score":0.024542395,"about_ca_system_score_codex":0.0014316768,"about_ca_system_score_gemma":0.0017138695,"threshold_uncertainty_score":0.048799098},"labels":[],"label_agreement":null},{"id":"W4284899645","doi":"10.36680/j.itcon.2022.031","title":"An earned-value-analysis (EVA)-based project control framework in large-scale scaffolding projects using linear regression modeling","year":2022,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Earned value management; Schedule; Productivity; Computer science; Project management; Scale (ratio); Scaffold; Engineering; Industrial engineering; Systems engineering; Operations research; Project planning; OPM3","score_opus":0.010298853933732635,"score_gpt":0.2622751645378014,"score_spread":0.2519763106040688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4284899645","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009730772,0.00012287786,0.98890543,0.00008492243,0.000013265126,0.00005364359,0.00004715075,0.00020957457,0.0008323376],"genre_scores_gemma":[0.7456494,0.0002795333,0.2515355,0.000047453424,0.000038756076,0.0004791244,0.00030848602,0.00010320308,0.0015584826],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9946727,0.002560987,0.0003294454,0.0011269004,0.0009531165,0.0003568584],"domain_scores_gemma":[0.995419,0.0023983007,0.00091276667,0.00017624603,0.00093522674,0.00015855298],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008570728,0.0015445688,0.0013326514,0.0025853158,0.0006949307,0.0031517718,0.0021957941,0.0010165544,0.0014397743],"category_scores_gemma":[0.009433919,0.0006749955,0.0014082782,0.0019717661,0.0013292549,0.002856041,0.001970344,0.0013348649,0.00024015327],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058769507,0.00012786433,0.0038021116,0.00010865529,0.00008795642,0.00011888727,0.00018116669,0.90880805,0.0011452779,0.030196035,0.0005646924,0.05480058],"study_design_scores_gemma":[0.0000034268808,0.000029090896,0.00036272843,0.00001050851,0.0000107214955,0.000009475538,0.000024859755,0.9939003,0.00021486226,0.005104901,0.00031642005,0.000012656657],"about_ca_topic_score_codex":0.0137717,"about_ca_topic_score_gemma":0.008004557,"teacher_disagreement_score":0.0137717,"about_ca_system_score_codex":0.0020471672,"about_ca_system_score_gemma":0.0026187182,"threshold_uncertainty_score":0.04532689},"labels":[],"label_agreement":null},{"id":"W4285014555","doi":"10.5539/mas.v16n3p19","title":"From Months to Days—An Efficient Microsoft-Excel Database: A Case of Dam Maintenance in United Arab Emirates","year":2022,"lang":"en","type":"article","venue":"Modern Applied Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Microsoft excel; Computer science; Duration (music); Work (physics); Software; Outcome (game theory); Engineering management; Database; Operations management; Operations research; Engineering; Operating system","score_opus":0.011600831129663243,"score_gpt":0.2281561626566065,"score_spread":0.21655533152694326,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285014555","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99337864,0.0001143245,0.0007573314,0.0007770056,0.0000064120422,0.00002744029,0.000033031254,0.000014055832,0.004891828],"genre_scores_gemma":[0.9954288,0.00018322848,0.0017400165,0.000092615555,0.0000076972965,0.000023578066,0.000046133864,0.000008142505,0.0024697671],"study_design_codex":"qualitative","study_design_gemma":"case_report","domain_scores_codex":[0.9973368,0.0012738387,0.00016666364,0.00022143534,0.0006014692,0.00039979728],"domain_scores_gemma":[0.9957991,0.0022157428,0.0007305155,0.00022606156,0.00057998503,0.00044856896],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022006093,0.00024088137,0.00017962334,0.0014611294,0.0034787331,0.0028984025,0.0011284373,0.0017029446,0.0017505419],"category_scores_gemma":[0.005288298,0.0003106096,0.0002332726,0.0019771445,0.0020095569,0.001873553,0.0013717656,0.0009319374,0.00027790482],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044157062,0.0024222748,0.25693408,0.00067124487,0.00007152983,0.15025273,0.40816456,0.008422344,0.007552277,0.05432227,0.010999156,0.09974596],"study_design_scores_gemma":[0.000048211106,0.0007345952,0.19980231,0.00040215426,0.000076854514,0.042408988,0.6406469,0.023507575,0.0058246395,0.004156886,0.08224004,0.000150849],"about_ca_topic_score_codex":0.022784034,"about_ca_topic_score_gemma":0.04186023,"teacher_disagreement_score":0.022784034,"about_ca_system_score_codex":0.0022661649,"about_ca_system_score_gemma":0.0019589998,"threshold_uncertainty_score":0.04530281},"labels":[],"label_agreement":null},{"id":"W4285079991","doi":"10.1109/cscwd49262.2021.9437725","title":"Proceedings of the 2021 IEEE 24th International Conference on Computer Supported Cooperative Work in Design (CSCWD)","year":2021,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":22,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Computer science; Work (physics); Software engineering; Engineering; Mechanical engineering","score_opus":0.02436899832137518,"score_gpt":0.21931362135582777,"score_spread":0.1949446230344526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285079991","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08472843,0.02210829,0.23767462,0.021927387,0.07207671,0.0012749096,0.0032064081,0.0035437064,0.5534595],"genre_scores_gemma":[0.08777642,0.0071695256,0.03699235,0.001349016,0.002722043,0.00041426654,0.007154776,0.000921549,0.85550004],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99847585,0.00046421675,0.00005582607,0.0001579317,0.0005988452,0.00024740526],"domain_scores_gemma":[0.997389,0.0003407358,0.00005244554,0.00023731453,0.0012911356,0.00068935106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033820549,0.0011770233,0.0011155795,0.0016355912,0.0023528277,0.0051882532,0.0013259099,0.0018778669,0.07724106],"category_scores_gemma":[0.0020523777,0.00035817176,0.0007168534,0.0012444787,0.0011407156,0.0017672443,0.0032161921,0.00205049,0.022646287],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047717433,0.00088907796,0.0032259854,0.00037006265,0.00007346319,0.00030777755,0.001191955,0.0013182967,0.010247903,0.011520886,0.59940505,0.37097242],"study_design_scores_gemma":[0.000036708436,0.00019270107,0.005947785,0.00027455814,0.00007061175,0.00024473542,0.0012995253,0.006151374,0.0060602087,0.006282409,0.9733975,0.00004193806],"about_ca_topic_score_codex":0.010703857,"about_ca_topic_score_gemma":0.027308695,"teacher_disagreement_score":0.07724106,"about_ca_system_score_codex":0.0012542037,"about_ca_system_score_gemma":0.0031717164,"threshold_uncertainty_score":0.2583971},"labels":[],"label_agreement":null},{"id":"W4285082882","doi":"10.35490/ec3.2022.144","title":"Utilizing simulation to predict optimum number of projects","year":2022,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interdependence; Computer science; Profit (economics); Discrete event simulation; Operations research; Software; Monte Carlo method; Work (physics); Capacity planning; Industrial engineering; Simulation; Engineering","score_opus":0.016806357826063018,"score_gpt":0.25699827949545556,"score_spread":0.24019192166939254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285082882","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5343048,0.0002848417,0.45015344,0.00024086927,0.000039089595,0.00013292929,0.0004514699,0.00062022323,0.013772309],"genre_scores_gemma":[0.9696333,0.00010562996,0.029106865,0.000010708664,0.0000035765006,0.00007115697,0.00022064967,0.00002635976,0.00082176685],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995427,0.00016263431,0.000025945588,0.000067950634,0.00013331982,0.00006738777],"domain_scores_gemma":[0.99875057,0.000797307,0.00015557479,0.000090690424,0.0001467042,0.000059128644],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079543726,0.0004723118,0.00047046682,0.00066343363,0.00028260064,0.0010394546,0.00041135645,0.00071412395,0.0015711592],"category_scores_gemma":[0.0027027503,0.00037366952,0.0003734476,0.00076017895,0.00034540612,0.00086534384,0.00031117751,0.0004207304,0.00027662696],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017425371,0.000009576896,0.001099859,0.0000051313377,0.0000045924035,0.000008211483,0.000005421727,0.99594104,0.00022455135,0.0007238469,0.00005286951,0.0019074207],"study_design_scores_gemma":[0.0000025462775,0.000008247815,0.00020483871,0.000001913698,0.000001766679,0.000003342999,0.0000048292027,0.998931,0.00021798813,0.00049350574,0.00012782868,0.0000021043895],"about_ca_topic_score_codex":0.009810906,"about_ca_topic_score_gemma":0.009366051,"teacher_disagreement_score":0.009810906,"about_ca_system_score_codex":0.00094850385,"about_ca_system_score_gemma":0.0013385727,"threshold_uncertainty_score":0.019507587},"labels":[],"label_agreement":null},{"id":"W4285157518","doi":"10.1109/tii.2022.3190566","title":"Multiobjective Evolutionary Model of the Construction Industry Based on Network Planning","year":2022,"lang":"en","type":"article","venue":"IEEE Transactions on Industrial Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Brandon University","funders":"","keywords":"Mathematical optimization; Particle swarm optimization; Computer science; Multi-objective optimization; Pareto principle; Genetic algorithm; Network planning and design; Scheduling (production processes); Flexibility (engineering); Mathematics","score_opus":0.02949107827831661,"score_gpt":0.2169477818313864,"score_spread":0.18745670355306981,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285157518","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029667092,0.0006954157,0.93681514,0.00053503714,0.00009164359,0.00008272631,0.00021619887,0.000110578694,0.03178613],"genre_scores_gemma":[0.82370603,0.0023603644,0.13691732,0.0001379541,0.00007660149,0.0006270223,0.00035867508,0.00009002625,0.035726134],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967134,0.00011480462,0.000010672396,0.00007356407,0.000087278226,0.00004235018],"domain_scores_gemma":[0.9998311,0.00007302066,0.00002990635,0.0000094754705,0.0000372181,0.000019340212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00046734742,0.0009471316,0.00062132796,0.00084332953,0.0006324023,0.0013970986,0.0015596887,0.0013016193,0.0036067462],"category_scores_gemma":[0.00065181596,0.00044704048,0.0008652396,0.001441078,0.0007330641,0.0014004189,0.00078485964,0.0008589182,0.00035178402],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000055270316,0.000008732371,0.00016661365,0.000016232289,0.000010451748,0.000057204557,0.000016542375,0.98392963,0.00025307827,0.012902365,0.0002019258,0.0024316595],"study_design_scores_gemma":[0.0000029186147,0.0000060136417,0.00006413725,0.0000025545085,0.000003976674,0.0000113366605,0.0000067370793,0.996349,0.000043224863,0.003015065,0.0004921987,0.000002840432],"about_ca_topic_score_codex":0.013761381,"about_ca_topic_score_gemma":0.008429342,"teacher_disagreement_score":0.013761381,"about_ca_system_score_codex":0.0013688039,"about_ca_system_score_gemma":0.0012022234,"threshold_uncertainty_score":0.027362525},"labels":[],"label_agreement":null},{"id":"W4285181045","doi":"10.5267/j.uscm.2022.5.007","title":"Discrete-event simulation-based decision making of Just-In-Time strategies for precast concrete supply chain using batch delivery and offsite inventory level","year":2022,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Kasetsart University","keywords":"Precast concrete; Supply chain; Lead time; Discrete event simulation; Operations management; Computer science; Supply chain management; Scheduling (production processes); Operations research; Decision support system; Risk analysis (engineering); Business; Engineering; Simulation; Marketing; Civil engineering","score_opus":0.025506970730764685,"score_gpt":0.2653178486600392,"score_spread":0.23981087792927452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285181045","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29346833,0.00023387675,0.68589246,0.0005537529,0.00011782054,0.0003389803,0.0004098725,0.0004798341,0.018505095],"genre_scores_gemma":[0.964673,0.00011691971,0.032787148,0.000038217986,0.00000805997,0.00015411928,0.00014651542,0.000018568813,0.0020574173],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952495,0.00021267222,0.000022854216,0.0000680061,0.00009073046,0.00008085865],"domain_scores_gemma":[0.99811757,0.001342035,0.00016423217,0.000065515844,0.00019310685,0.000117594405],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012242461,0.0007455677,0.0008210584,0.00044602426,0.0004721365,0.001215869,0.0009302572,0.00081796397,0.0034342029],"category_scores_gemma":[0.0020250722,0.00049880845,0.0008570713,0.00036155543,0.00053860515,0.0007834559,0.0006342917,0.0010700119,0.0001882623],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002814151,0.00002485356,0.0003525173,0.00001381603,0.000008025188,0.00001552667,0.000012552483,0.9966659,0.00019214569,0.0013344857,0.00005052855,0.0013014799],"study_design_scores_gemma":[0.0000062592967,0.000015853617,0.000050234677,0.0000022552238,0.0000030790966,0.0000015828954,0.00000907942,0.9991371,0.00013718168,0.0005278296,0.00010712123,0.0000024143476],"about_ca_topic_score_codex":0.01737897,"about_ca_topic_score_gemma":0.013909788,"teacher_disagreement_score":0.01737897,"about_ca_system_score_codex":0.0013352527,"about_ca_system_score_gemma":0.0024207537,"threshold_uncertainty_score":0.034555614},"labels":[],"label_agreement":null},{"id":"W4285796201","doi":"10.3390/buildings12071043","title":"Predictive Analytics for Early-Stage Construction Costs Estimation","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":37,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Predictive analytics; Analytics; Computer science; Activity-based costing; Cost estimate; Implementation; Data science; Estimation; Software analytics; Risk analysis (engineering); Engineering; Software; Business; Software engineering; Systems engineering; Marketing; Software development","score_opus":0.008180053047348129,"score_gpt":0.21752719434793674,"score_spread":0.20934714130058862,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4285796201","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.065981954,0.19592425,0.6769562,0.0070639974,0.0007233084,0.002012208,0.013714787,0.0016740432,0.035949223],"genre_scores_gemma":[0.52591974,0.10873785,0.3525744,0.0008836657,0.000366517,0.001912372,0.0075101876,0.0002745947,0.0018205586],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9821238,0.008987505,0.0018180452,0.0011586848,0.0055959877,0.00031600433],"domain_scores_gemma":[0.85518265,0.11555397,0.008970231,0.004869443,0.01510966,0.00031405533],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0240137,0.0014423068,0.0013732426,0.018923676,0.00049973675,0.0048742564,0.0019194202,0.0008215988,0.0034230652],"category_scores_gemma":[0.109580934,0.0006866254,0.0024578972,0.018068079,0.0008352228,0.005992233,0.0017117627,0.001719585,0.0008101352],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018981265,0.00014298025,0.025956385,0.038035598,0.001483011,0.00027662833,0.0021398242,0.029232774,0.0017292834,0.059296,0.010331925,0.8311858],"study_design_scores_gemma":[0.00015423824,0.0010482719,0.07936514,0.1268738,0.006033116,0.0014849228,0.013007936,0.14625005,0.014764163,0.263795,0.34649655,0.00072691013],"about_ca_topic_score_codex":0.0054457327,"about_ca_topic_score_gemma":0.008568063,"teacher_disagreement_score":0.0240137,"about_ca_system_score_codex":0.0018670114,"about_ca_system_score_gemma":0.005525598,"threshold_uncertainty_score":0.12699807},"labels":[],"label_agreement":null},{"id":"W4286789963","doi":"10.1061/(asce)co.1943-7862.0002343","title":"BIM Critical-Success Factors in the Design Phase and Risk Management: Exploring Knowledge and Maturity Mediating Effect","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":17,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Structural equation modeling; Maturity (psychological); Building information modeling; Critical success factor; Capability Maturity Model; Knowledge management; Path analysis (statistics); Process (computing); Process management; Sample (material); Phase (matter); Computer science; Engineering; Psychology; Operations management; Physics","score_opus":0.013489637352717493,"score_gpt":0.23430595284469022,"score_spread":0.22081631549197273,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4286789963","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9868155,0.00023070768,0.0042706556,0.0003325476,0.00000498005,0.00006619455,0.000028856026,0.000010453511,0.008240077],"genre_scores_gemma":[0.99804497,0.00009057538,0.0015625281,0.000012289531,0.0000020365837,0.00002055814,0.000012876494,0.0000015556319,0.00025272128],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99346596,0.003147381,0.0004464548,0.00047710398,0.0018101865,0.00065285154],"domain_scores_gemma":[0.9548972,0.030108074,0.008293662,0.0011914065,0.0033792849,0.0021304602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063766176,0.0006719525,0.00039449663,0.003139069,0.0007647987,0.0028760731,0.00049952243,0.00070294645,0.0032800667],"category_scores_gemma":[0.028431198,0.00037312042,0.0006857609,0.0014180297,0.0020398176,0.0025353152,0.0030390166,0.0012153942,0.0001621441],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002074899,0.0012784197,0.81349826,0.00047875178,0.0002580028,0.0006402272,0.03941089,0.0026439184,0.002673495,0.023120834,0.00027881938,0.11551083],"study_design_scores_gemma":[0.000034225835,0.0006586776,0.9057774,0.0007585452,0.0003078719,0.00048561406,0.057815127,0.011284325,0.003947237,0.013614889,0.005216555,0.000099623525],"about_ca_topic_score_codex":0.0046269414,"about_ca_topic_score_gemma":0.0044170152,"teacher_disagreement_score":0.0063766176,"about_ca_system_score_codex":0.002532643,"about_ca_system_score_gemma":0.005060166,"threshold_uncertainty_score":0.033723235},"labels":[],"label_agreement":null},{"id":"W4288820323","doi":"10.1007/978-3-662-53120-4_300375","title":"Life Cycle Cost Analysis","year":2019,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Life-cycle cost analysis; Computer science; Reliability engineering; Engineering","score_opus":0.008379556972199862,"score_gpt":0.1893258483321506,"score_spread":0.18094629135995074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4288820323","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011817513,0.004911859,0.18058483,0.0006893607,0.00040348188,0.000289523,0.006056874,0.00058140495,0.7946653],"genre_scores_gemma":[0.23399104,0.008062664,0.07669598,0.0003061299,0.00017069408,0.0005680458,0.010172295,0.0011899811,0.66884315],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99912554,0.00010777498,0.000020675534,0.0000886471,0.00059101026,0.00006633235],"domain_scores_gemma":[0.99951696,0.00011867393,0.00002231053,0.00005216668,0.00028094553,0.000008988782],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006061046,0.0011646798,0.00062463275,0.00408839,0.0005091691,0.0017621901,0.0012992065,0.00059046363,0.05358998],"category_scores_gemma":[0.0016807521,0.00035708142,0.0009839892,0.0039097136,0.00023133325,0.0016166592,0.0004871956,0.00081709964,0.012211216],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006242374,0.00011088011,0.0009769262,0.0005610355,0.000065316344,0.000089956135,0.000100641126,0.13072534,0.0031639943,0.19962244,0.08737527,0.5771459],"study_design_scores_gemma":[0.000009593963,0.00013935436,0.0056403205,0.0005106202,0.00010147668,0.00028679537,0.00037050777,0.24140301,0.011659574,0.1379438,0.60184854,0.0000864715],"about_ca_topic_score_codex":0.010955211,"about_ca_topic_score_gemma":0.01797508,"teacher_disagreement_score":0.05358998,"about_ca_system_score_codex":0.003376882,"about_ca_system_score_gemma":0.0015088689,"threshold_uncertainty_score":0.17927635},"labels":[],"label_agreement":null},{"id":"W4290641841","doi":"","title":"21st IEEE International Conference on Computer Supported Cooperative Work in Design","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Work (physics); Computer science; Computer-supported cooperative work; Engineering management; Software engineering; Engineering; Mechanical engineering","score_opus":0.037650827578654754,"score_gpt":0.24877214861475094,"score_spread":0.21112132103609618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4290641841","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02932525,0.04948877,0.7142875,0.0064459564,0.026049107,0.0004945335,0.0005700444,0.0036110315,0.16972777],"genre_scores_gemma":[0.23838685,0.037895516,0.29468638,0.0015772013,0.0029996545,0.0007288907,0.00483524,0.0016571087,0.41723326],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971119,0.0009796207,0.00015785832,0.0003393086,0.0011194872,0.00029183493],"domain_scores_gemma":[0.995845,0.0010914762,0.000085473526,0.0011765804,0.001337897,0.00046361063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0055434336,0.0011036868,0.0017223982,0.0020572913,0.0011752353,0.004139429,0.0023948264,0.0018143929,0.03618713],"category_scores_gemma":[0.005272551,0.00047089282,0.0011629919,0.0015319721,0.0014276509,0.0023222938,0.0030201164,0.0019611341,0.007710781],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003031269,0.00055739057,0.0016266777,0.0005872509,0.00011586872,0.0002379266,0.0008192583,0.004260859,0.009229653,0.034161184,0.14208269,0.80601805],"study_design_scores_gemma":[0.00004653223,0.00032739752,0.004110446,0.0006022643,0.00013813129,0.00047951646,0.0008547344,0.033255536,0.00782206,0.036072765,0.9162318,0.00005874562],"about_ca_topic_score_codex":0.0046401103,"about_ca_topic_score_gemma":0.006451207,"teacher_disagreement_score":0.03618713,"about_ca_system_score_codex":0.0012194726,"about_ca_system_score_gemma":0.0032938025,"threshold_uncertainty_score":0.12105805},"labels":[],"label_agreement":null},{"id":"W4290932114","doi":"10.1139/cjce-2021-0565","title":"Computational simulation as a decision-making support tool for prefabricated pillars production","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Production (economics); Productivity; Decision support system; Production line; Dashboard; Engineering; Computer science; Operations research; Construction engineering; Software engineering; Economics","score_opus":0.007431056533975132,"score_gpt":0.21341779301129032,"score_spread":0.2059867364773152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4290932114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09422972,0.00016623556,0.87959975,0.00062108337,0.0000843161,0.00035053282,0.0010682697,0.004119592,0.019760566],"genre_scores_gemma":[0.6136804,0.00037856543,0.38029894,0.00010459074,0.000025238887,0.0007370667,0.000992529,0.00030075642,0.0034819038],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994259,0.00024295485,0.000046681595,0.00007217937,0.00016734804,0.00004485221],"domain_scores_gemma":[0.99803716,0.0014521698,0.00010004078,0.00014462008,0.00017211967,0.00009387052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011325555,0.00080572226,0.0008028605,0.000817542,0.00073603843,0.002027833,0.0014384435,0.0013116035,0.0060627433],"category_scores_gemma":[0.0026378664,0.00055013766,0.00083447347,0.00082649506,0.00066601293,0.0010599853,0.0014411027,0.0011982791,0.0005462517],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006532686,0.00008396691,0.00081655034,0.00006424399,0.000027812888,0.000089424255,0.0001710525,0.97767776,0.0014331227,0.009457125,0.0005598386,0.009553778],"study_design_scores_gemma":[0.000013888232,0.000011305126,0.00008205354,0.000010813919,0.000005750074,0.00000876999,0.00002847882,0.994959,0.00062371296,0.0026185927,0.0016307895,0.000006855944],"about_ca_topic_score_codex":0.008824191,"about_ca_topic_score_gemma":0.008127657,"teacher_disagreement_score":0.008824191,"about_ca_system_score_codex":0.0009929579,"about_ca_system_score_gemma":0.001997529,"threshold_uncertainty_score":0.02028191},"labels":[],"label_agreement":null},{"id":"W4292176249","doi":"10.56748/ejse.331","title":"Qualitative &amp; Semi-Quantitative Reasoning Techniques for Engineering Projects at Conceptual Stage","year":2003,"lang":"en","type":"article","venue":"Electronic Journal of Structural Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Coquitlam College","funders":"","keywords":"Qualitative reasoning; Computer science; Abstraction; Management science; Artificial intelligence; Engineering; Epistemology","score_opus":0.01707063865030917,"score_gpt":0.2833095035985923,"score_spread":0.26623886494828314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292176249","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00030248173,0.00020208555,0.99787974,0.00016737446,0.000018799805,0.00010766318,0.000072516385,0.00015882675,0.0010904522],"genre_scores_gemma":[0.018345797,0.00044525584,0.9796434,0.000071116294,0.000026128664,0.0005988302,0.0001860054,0.000053097905,0.00063035206],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9813524,0.011090459,0.0016037362,0.00078395684,0.0049175685,0.00025191135],"domain_scores_gemma":[0.94789517,0.03939937,0.002846158,0.00513754,0.004410026,0.00031161777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022758117,0.0018684149,0.001127167,0.0034944392,0.0015322857,0.005966063,0.00385872,0.001862633,0.0071521522],"category_scores_gemma":[0.04550121,0.001365086,0.002723586,0.0031280792,0.0069946223,0.0055877995,0.0038165275,0.0036433688,0.002155221],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000861263,0.000108482694,0.00041847085,0.002235614,0.00013186758,0.00049938576,0.00282472,0.07114083,0.0051586884,0.8096083,0.0043962146,0.10339134],"study_design_scores_gemma":[0.00006581458,0.000054437984,0.00019407233,0.000682667,0.000050174494,0.0002694908,0.0005657015,0.1485096,0.004334657,0.8078367,0.037360497,0.00007619844],"about_ca_topic_score_codex":0.003117549,"about_ca_topic_score_gemma":0.0034815725,"teacher_disagreement_score":0.022758117,"about_ca_system_score_codex":0.0030445927,"about_ca_system_score_gemma":0.0039550224,"threshold_uncertainty_score":0.12035781},"labels":[],"label_agreement":null},{"id":"W4292315412","doi":"10.1061/9780784416051","title":"Anchorage Design for Petrochemical and Other Industrial Facilities","year":2022,"lang":"en","type":"book","venue":"American Society of Civil Engineers eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dow Chemical (Canada)","funders":"","keywords":"Petrochemical; Engineering; Code (set theory); Manufacturing engineering; Construction engineering; Systems engineering; Computer science; Waste management; Set (abstract data type); Programming language","score_opus":0.02268913325100241,"score_gpt":0.20626030688705646,"score_spread":0.18357117363605405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292315412","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013280243,0.0041212137,0.10621535,0.0009402622,0.0021594984,0.00013186461,0.0019540295,0.0034894426,0.8796603],"genre_scores_gemma":[0.0067638275,0.002577391,0.026986843,0.00021660229,0.00013213727,0.00011790735,0.0014575521,0.0013017224,0.96044594],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99908006,0.000060536433,0.000038175593,0.00007288271,0.000711674,0.000036624213],"domain_scores_gemma":[0.9995161,0.00007083669,0.000020973803,0.0000593888,0.00030955306,0.00002311728],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043562456,0.001458225,0.00041123884,0.0015680648,0.0009850356,0.0028208108,0.001130612,0.0014047882,0.1332189],"category_scores_gemma":[0.0013890736,0.0009880738,0.0004196361,0.0017950296,0.0004874836,0.0023094194,0.0013983279,0.0016155589,0.07833702],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014203926,0.000014733421,0.000112827096,0.00020067659,0.000004239027,0.00008425751,0.00014749625,0.002697135,0.0019255171,0.03993851,0.69902456,0.25583583],"study_design_scores_gemma":[0.000002266744,0.000008607485,0.00013786904,0.000041608255,0.0000024074063,0.0001282566,0.00003204846,0.0008136593,0.00037275584,0.0031487062,0.9953053,0.0000066078874],"about_ca_topic_score_codex":0.0062356717,"about_ca_topic_score_gemma":0.014297078,"teacher_disagreement_score":0.1332189,"about_ca_system_score_codex":0.0012341711,"about_ca_system_score_gemma":0.0015300289,"threshold_uncertainty_score":0.4456616},"labels":[],"label_agreement":null},{"id":"W4292830129","doi":"10.23919/annsim55834.2022.9859473","title":"Software Architecture For Integrating Devs Simulation Into BIM","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"DEVS; HVAC; Building information modeling; Building science; Computer science; Efficient energy use; Systems engineering; Discrete event simulation; Architecture; Building management system; Building automation; Building design; Architectural engineering; Software; Modeling and simulation; Simulation; Engineering; Artificial intelligence","score_opus":0.00805261867266238,"score_gpt":0.22437754497841528,"score_spread":0.2163249263057529,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4292830129","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018555141,0.00003391234,0.98282695,0.00015466489,0.000043017837,0.000093988805,0.000185563,0.010538572,0.0042678104],"genre_scores_gemma":[0.080963574,0.00034179827,0.90645146,0.00018720912,0.0000332403,0.0006515175,0.0025794692,0.0037287797,0.0050630607],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99834824,0.00046780007,0.00021284161,0.0001759191,0.0006751332,0.00012013286],"domain_scores_gemma":[0.9972746,0.00092382147,0.00014285978,0.00084204477,0.00064089143,0.00017579626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036627182,0.0012213442,0.0008771803,0.0014850321,0.0006648705,0.003375037,0.0031449504,0.0014927505,0.009664514],"category_scores_gemma":[0.007610733,0.0013831656,0.0021011303,0.00096705556,0.0010412753,0.0021579333,0.0035896352,0.0027292701,0.0039225104],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002537401,0.0005708064,0.005689477,0.0005564777,0.0003213117,0.0005128532,0.0009983319,0.455571,0.013863666,0.30509254,0.016761208,0.19980864],"study_design_scores_gemma":[0.000047043635,0.000053991378,0.00038624427,0.00010394751,0.000054217377,0.00013479135,0.00007482048,0.8747085,0.00654838,0.040503677,0.07732973,0.000054650583],"about_ca_topic_score_codex":0.0046574036,"about_ca_topic_score_gemma":0.004610957,"teacher_disagreement_score":0.009664514,"about_ca_system_score_codex":0.0010915721,"about_ca_system_score_gemma":0.002196026,"threshold_uncertainty_score":0.03233099},"labels":[],"label_agreement":null},{"id":"W4293069123","doi":"10.1007/978-981-19-1029-6_15","title":"Technology-Oriented Innovation in Construction: A Conceptual Mapping Framework","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Benchmarking; Maturity (psychological); Conceptual framework; Capability Maturity Model; Context (archaeology); Process management; Quality (philosophy); Conceptual model; The Conceptual Framework; Knowledge management; Engineering; Business; Computer science; Marketing; Geography; Political science","score_opus":0.008058545192238387,"score_gpt":0.1920477730640888,"score_spread":0.1839892278718504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069123","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012275995,0.0070902575,0.744103,0.0049488754,0.0002579327,0.00016775334,0.0002646808,0.00024733203,0.23064421],"genre_scores_gemma":[0.52742237,0.008352894,0.43768215,0.0004980557,0.00017561589,0.0007377807,0.00057170365,0.00018858712,0.024370937],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99867225,0.0007229066,0.00008791994,0.00018249553,0.00021582963,0.00011861096],"domain_scores_gemma":[0.99906534,0.00057817233,0.00008016895,0.00010149955,0.0001074315,0.00006741909],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024247263,0.0011741477,0.00058506156,0.0043343985,0.0016706572,0.008525636,0.0024904204,0.0019304327,0.007470338],"category_scores_gemma":[0.0019401312,0.0006572526,0.0014690924,0.0070804604,0.009214553,0.011578858,0.0028720063,0.002025716,0.0011599257],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000012646229,0.000007186797,0.00005216272,0.000028765562,0.0000038863664,0.000025222076,0.0006158137,0.0009360001,0.000047439335,0.99395365,0.00034533805,0.0039831516],"study_design_scores_gemma":[0.0000039406605,0.00001000528,0.00018563468,0.00012633353,0.000011354717,0.00009651527,0.0014451614,0.0063678827,0.00016771368,0.95914465,0.032429535,0.00001118099],"about_ca_topic_score_codex":0.0049194894,"about_ca_topic_score_gemma":0.003893167,"teacher_disagreement_score":0.008525636,"about_ca_system_score_codex":0.004348563,"about_ca_system_score_gemma":0.0030712336,"threshold_uncertainty_score":0.031551182},"labels":[],"label_agreement":null},{"id":"W4293069240","doi":"10.1007/978-981-19-1029-6_49","title":"Integrating Building Information Modeling and Virtual Reality to Facilitate the Implementation of Universal Design for Facilities at the Conceptual Stage","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Conceptual design; Usability; Universal design; Systems engineering; Process (computing); Engineering design process; Conceptual model; Engineering; Architectural engineering; Architecture; Virtual reality; Computer science; Design technology; Design for All; Human–computer interaction; World Wide Web; Operations management","score_opus":0.027643055800191763,"score_gpt":0.22912736903327988,"score_spread":0.2014843132330881,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069240","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004164648,0.00061427505,0.95459855,0.00034010143,0.00008973387,0.000031857977,0.000076427394,0.0019979903,0.03808645],"genre_scores_gemma":[0.14872806,0.0019518773,0.81821376,0.00017293819,0.00003480178,0.00008624965,0.0006477095,0.0006143702,0.029550286],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992631,0.00019069076,0.000034891957,0.00007076887,0.00036926518,0.00007129188],"domain_scores_gemma":[0.9995628,0.00017057247,0.000022450546,0.00013816517,0.00007875042,0.000027339815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010088739,0.00060204504,0.00044001927,0.0010392343,0.00043567503,0.0032286658,0.0014708353,0.0010631832,0.008979762],"category_scores_gemma":[0.0013502126,0.00060419954,0.0007620368,0.0011840808,0.0007993619,0.0037406038,0.0030040445,0.0011648062,0.0021955892],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039309634,0.00010840249,0.0004945751,0.00041549891,0.000040848667,0.0002955032,0.0020632215,0.06927079,0.01760725,0.36956632,0.015368901,0.5247295],"study_design_scores_gemma":[0.000019754247,0.00016103146,0.001326049,0.0005164223,0.0000970874,0.0009268727,0.0010373045,0.32527867,0.032559156,0.11947785,0.5184731,0.00012674171],"about_ca_topic_score_codex":0.0039645103,"about_ca_topic_score_gemma":0.0067392136,"teacher_disagreement_score":0.008979762,"about_ca_system_score_codex":0.00063555123,"about_ca_system_score_gemma":0.0010407552,"threshold_uncertainty_score":0.030040324},"labels":[],"label_agreement":null},{"id":"W4293069250","doi":"10.1007/978-981-19-1029-6_36","title":"A Case Study of the Impact of Modular Manufacturing on a Hospital Expansion Project","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Building information modeling; Modular design; Productivity; Process management; Product (mathematics); Knowledge management; Stakeholder; Information sharing; Business; Engineering; Operations management; Computer science","score_opus":0.009434570756719324,"score_gpt":0.21384386882647194,"score_spread":0.2044092980697526,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069250","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95096976,0.00020089372,0.006497173,0.0004787815,0.000025625579,0.00023429851,0.00015296428,0.00007543018,0.041364927],"genre_scores_gemma":[0.9801706,0.00027044877,0.006854073,0.00005016687,0.0000091414695,0.00007236372,0.00010415109,0.000034676745,0.012434397],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.998589,0.0006834667,0.000029250663,0.00008078863,0.00033899493,0.0002784579],"domain_scores_gemma":[0.9983284,0.0008965575,0.0001143932,0.00013315378,0.0001673394,0.0003602136],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014787038,0.00076346,0.00035932806,0.0014721125,0.0037324491,0.0018936881,0.0019588077,0.0027046055,0.0075331004],"category_scores_gemma":[0.0020680695,0.00041331173,0.00062170206,0.001753489,0.0015001884,0.0010914188,0.0021053215,0.0012159535,0.0008734164],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021344777,0.009532521,0.07823323,0.0018246103,0.00031744066,0.19360162,0.06600817,0.23842773,0.04761768,0.071892254,0.02018912,0.27022117],"study_design_scores_gemma":[0.00068080676,0.009811239,0.1934863,0.0013371104,0.0004828911,0.038257487,0.28662872,0.23919289,0.033413142,0.017926333,0.17832167,0.00046141155],"about_ca_topic_score_codex":0.011127452,"about_ca_topic_score_gemma":0.027530719,"teacher_disagreement_score":0.011127452,"about_ca_system_score_codex":0.002159292,"about_ca_system_score_gemma":0.0016050172,"threshold_uncertainty_score":0.025200725},"labels":[],"label_agreement":null},{"id":"W4293069260","doi":"10.1007/978-981-19-1029-6_34","title":"A Framework to Evaluate School Infrastructure Project Need Using Fuzzy Expert System","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Government of Alberta; University of Alberta","funders":"","keywords":"Process (computing); Context (archaeology); Work (physics); Domain (mathematical analysis); Investment (military); Engineering management; Prioritization; Process management; Computer science; Engineering; Management science; Knowledge management; Geography; Political science","score_opus":0.013833093759593393,"score_gpt":0.23820924424130474,"score_spread":0.22437615048171133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069260","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03666834,0.00013939569,0.95560265,0.00010206638,0.000020103505,0.0002249847,0.00023946047,0.0009384776,0.006064489],"genre_scores_gemma":[0.45212284,0.00011225201,0.5432825,0.000052969815,0.0000143718735,0.00033659214,0.0005267464,0.000033627173,0.0035180568],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999278,0.00017946717,0.00006398947,0.000110096706,0.000305779,0.00006270221],"domain_scores_gemma":[0.99941313,0.00015833207,0.000038725677,0.00003249025,0.00032707295,0.000030241845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013498585,0.00061684754,0.00057626097,0.0024341724,0.00056516443,0.0013155406,0.0009649359,0.0008113837,0.002523885],"category_scores_gemma":[0.0017084447,0.00023825374,0.0005262736,0.00092436926,0.00036890322,0.0010951776,0.0006188434,0.00039685692,0.00051071437],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031462224,0.0005961304,0.010592939,0.00030182683,0.00024845515,0.00043441268,0.00062873703,0.41687915,0.031463377,0.058046885,0.0072141965,0.47327927],"study_design_scores_gemma":[0.000017781049,0.000090196154,0.0017213633,0.00003803741,0.000056548433,0.00005677414,0.00018657255,0.9837706,0.004677602,0.006846075,0.0025076866,0.000030732215],"about_ca_topic_score_codex":0.015752444,"about_ca_topic_score_gemma":0.016888553,"teacher_disagreement_score":0.015752444,"about_ca_system_score_codex":0.0012239995,"about_ca_system_score_gemma":0.0015087266,"threshold_uncertainty_score":0.031321466},"labels":[],"label_agreement":null},{"id":"W4293069264","doi":"10.1007/978-981-19-1029-6_33","title":"Evaluation of the Return on Investment of BIM—The Case of an Architectural Firm","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Benchmarking; Return on investment; Process management; Workflow; Process (computing); Investment (military); Performance indicator; Productivity; Computer science; Systems engineering; Operations management; Business; Engineering; Production (economics); Database; Scheduling (production processes); Marketing","score_opus":0.01558051746200722,"score_gpt":0.22072154819827763,"score_spread":0.2051410307362704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069264","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.940919,0.00026173348,0.001656878,0.0007554657,0.000017923137,0.000041614756,0.00014651273,0.000019547368,0.056181256],"genre_scores_gemma":[0.99748284,0.00007274169,0.00050540076,0.000011879808,0.0000030781612,0.000007579186,0.000045929006,0.0000045322695,0.0018659465],"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","domain_scores_codex":[0.9979371,0.0010695589,0.000059666698,0.000110185676,0.0004586313,0.0003648965],"domain_scores_gemma":[0.9838976,0.012915389,0.00071218156,0.0005885972,0.0013582635,0.00052802055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042594783,0.00039284703,0.00037401036,0.0012171193,0.00083682284,0.0041609397,0.0010704298,0.0019062064,0.00781503],"category_scores_gemma":[0.0155473985,0.00027971825,0.0003655682,0.0017167488,0.0013566001,0.0030109633,0.0010949194,0.0012162072,0.0005985404],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.005605341,0.003906516,0.16453709,0.00052528456,0.00020809352,0.0058570364,0.0043489328,0.3385648,0.0053466265,0.27984688,0.010899106,0.18035427],"study_design_scores_gemma":[0.00031163447,0.0036741495,0.17449678,0.0002552521,0.00037162716,0.0012730641,0.035106767,0.7021322,0.006438403,0.054832764,0.020924484,0.00018289233],"about_ca_topic_score_codex":0.01254072,"about_ca_topic_score_gemma":0.013510562,"teacher_disagreement_score":0.01254072,"about_ca_system_score_codex":0.004414726,"about_ca_system_score_gemma":0.001289259,"threshold_uncertainty_score":0.03203118},"labels":[],"label_agreement":null},{"id":"W4293069330","doi":"10.1007/978-981-19-1029-6_17","title":"Towards Construction’s Digital Future: A Roadmap for Enhancing Data Value","year":2022,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Big data; Raw data; Computer science; Data science; Bridging (networking); Digital data; Process management; Knowledge management; Engineering; Data mining","score_opus":0.010316268770082212,"score_gpt":0.2035371152508214,"score_spread":0.1932208464807392,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293069330","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010610049,0.08370915,0.13790435,0.22842856,0.0051278127,0.00009124657,0.0006641999,0.0011619767,0.5323026],"genre_scores_gemma":[0.3819213,0.17323242,0.2673073,0.025058122,0.0041249967,0.00026028327,0.002553736,0.001253862,0.14428803],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9974252,0.00084722927,0.00009776984,0.00016953799,0.0011884148,0.00027186537],"domain_scores_gemma":[0.99501663,0.0022539804,0.00017865105,0.0007528316,0.0011176623,0.0006802168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005968148,0.00084757997,0.00059420377,0.0026004952,0.0016951745,0.016682733,0.0019574938,0.004579888,0.019039618],"category_scores_gemma":[0.0066342084,0.0004750376,0.0006447334,0.006251942,0.008249823,0.032054234,0.007644506,0.0045733606,0.0036969623],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016643218,0.000026133666,0.0002312685,0.0002703568,0.000008602023,0.000045190853,0.0008740423,0.00068112655,0.00035594613,0.85654855,0.049680512,0.0912616],"study_design_scores_gemma":[0.0000037355715,0.000008956155,0.00021521072,0.00030012644,0.0000049975033,0.000105486695,0.0010226773,0.00092672044,0.00031786703,0.2564387,0.74064326,0.000012220849],"about_ca_topic_score_codex":0.005978624,"about_ca_topic_score_gemma":0.006085584,"teacher_disagreement_score":0.019039618,"about_ca_system_score_codex":0.0066971513,"about_ca_system_score_gemma":0.009401148,"threshold_uncertainty_score":0.06369388},"labels":[],"label_agreement":null},{"id":"W4293074059","doi":"10.11159/iccste22","title":"Proceedings of the 7th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'22)","year":2022,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"Karadeniz Teknik Üniversitesi","keywords":"Engineering; Construction engineering; Computer science; Engineering ethics","score_opus":0.013244340646576154,"score_gpt":0.21587289094867743,"score_spread":0.20262855030210128,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293074059","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0559266,0.03398026,0.25447595,0.011740519,0.058829494,0.0006236519,0.0024581363,0.005323434,0.576642],"genre_scores_gemma":[0.07206913,0.009523008,0.04402988,0.00072080625,0.0019485169,0.00023861686,0.004618605,0.0008480369,0.8660035],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986987,0.00019741745,0.00006255528,0.00016836275,0.0006959746,0.00017693469],"domain_scores_gemma":[0.99820864,0.0001339483,0.00003270502,0.00022860421,0.0011098146,0.00028617008],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001862548,0.0012146392,0.0009201374,0.0015860157,0.0008229088,0.0029480457,0.0011348947,0.0011599687,0.08415639],"category_scores_gemma":[0.0014231734,0.00027293572,0.00069837715,0.0012525682,0.00091393024,0.0012670622,0.0016793422,0.0015545142,0.036537558],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002888635,0.00031577479,0.0024227104,0.0002508939,0.000050163017,0.00034445204,0.00021349567,0.0026740753,0.008360535,0.004673296,0.44843796,0.5319678],"study_design_scores_gemma":[0.000012582752,0.00017221717,0.0040302016,0.00016266986,0.000024940142,0.00042061013,0.00025808075,0.009696169,0.004097415,0.0018045934,0.97929525,0.000025174133],"about_ca_topic_score_codex":0.0058595054,"about_ca_topic_score_gemma":0.015308375,"teacher_disagreement_score":0.08415639,"about_ca_system_score_codex":0.0010303564,"about_ca_system_score_gemma":0.0020053927,"threshold_uncertainty_score":0.28153116},"labels":[],"label_agreement":null},{"id":"W4293103574","doi":"10.3390/buildings12091303","title":"Insights into Concrete Forming, Reinforcing, and Pouring in Building Construction","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; George Brown College","funders":"","keywords":"Formwork; Rebar; Engineering; Construction industry; Reinforced concrete; Hazard; Structural engineering; Construction engineering; Forensic engineering; Civil engineering","score_opus":0.004703633444355788,"score_gpt":0.19318805044179685,"score_spread":0.18848441699744106,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293103574","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94793105,0.0011525056,0.010252193,0.0038508668,0.000039704664,0.00004420505,0.000041963205,0.000027882008,0.036659602],"genre_scores_gemma":[0.99411833,0.00064841437,0.0019738139,0.0002665345,0.000010943932,0.000011844289,0.000014824645,0.00001665437,0.0029386482],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99474996,0.0037629823,0.000093495684,0.00015576175,0.00057774055,0.00066010846],"domain_scores_gemma":[0.99566036,0.0030171014,0.00041923916,0.000101221565,0.00022230115,0.00057980855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004220066,0.0006864691,0.0003040214,0.0011465881,0.0039989543,0.004140414,0.0007328741,0.00168355,0.0020706316],"category_scores_gemma":[0.003957243,0.00075815944,0.00034762706,0.0008414312,0.009376711,0.0038698101,0.0038856466,0.0023525557,0.00029316903],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018607328,0.00002997624,0.0029340324,0.00009212768,0.0000025259753,0.0013624278,0.97842044,0.00016389768,0.0015013558,0.008826411,0.00040638365,0.006241862],"study_design_scores_gemma":[0.0000031768757,0.000051580268,0.0039982884,0.000117920994,0.0000043777504,0.0009551515,0.96842426,0.00024793734,0.0004701651,0.0035272376,0.022186177,0.000013709577],"about_ca_topic_score_codex":0.0070560775,"about_ca_topic_score_gemma":0.02019004,"teacher_disagreement_score":0.0070560775,"about_ca_system_score_codex":0.002721935,"about_ca_system_score_gemma":0.0029556016,"threshold_uncertainty_score":0.022318125},"labels":[],"label_agreement":null},{"id":"W4293108473","doi":"10.5383/juspn.16.02.003","title":"Design and Study of a Digital Energy Building: Case of Morocco","year":2022,"lang":"en","type":"article","venue":"Journal of Ubiquitous Systems and Pervasive Networks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Industrial Revolution; Urbanization; Energy consumption; Work (physics); Consumption (sociology); Architectural engineering; Globalization; Quality (philosophy); Digital Revolution; Business; Production (economics); Energy (signal processing); Environmental economics; Operations management; Computer science; Economic growth; Engineering; Economics; Political science; Mechanical engineering; Telecommunications; Sociology; Market economy","score_opus":0.012304327759315257,"score_gpt":0.2095279771306033,"score_spread":0.19722364937128806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293108473","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92768186,0.000523845,0.014865991,0.0013087407,0.00006603037,0.0002477931,0.00018047268,0.00006856604,0.055056754],"genre_scores_gemma":[0.9770017,0.00022048524,0.010282629,0.0000622132,0.000006081908,0.00006693025,0.000054431242,0.000018057033,0.012287428],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99926096,0.00038493774,0.000025330119,0.0000744904,0.00010731928,0.00014687986],"domain_scores_gemma":[0.9996408,0.0001397754,0.00002785289,0.00003947271,0.000052407075,0.00009964415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008045615,0.00038386864,0.00022741665,0.00069948816,0.0031307882,0.00207254,0.0009686909,0.0014052498,0.0047078226],"category_scores_gemma":[0.0008300446,0.00019166873,0.00037951188,0.00048336966,0.0017575234,0.00083607994,0.0016892803,0.00050454895,0.0004874887],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015000266,0.002279,0.07170038,0.0019609013,0.00014109715,0.12209384,0.106024124,0.18915987,0.052809156,0.27536538,0.010497025,0.16646926],"study_design_scores_gemma":[0.00031257817,0.0016088788,0.060469892,0.0009310074,0.00024900783,0.011216462,0.22493848,0.2167081,0.02592039,0.022956956,0.43447608,0.00021218284],"about_ca_topic_score_codex":0.033805262,"about_ca_topic_score_gemma":0.059699923,"teacher_disagreement_score":0.033805262,"about_ca_system_score_codex":0.003620519,"about_ca_system_score_gemma":0.0017074122,"threshold_uncertainty_score":0.06721699},"labels":[],"label_agreement":null},{"id":"W4293169025","doi":"10.3390/su141610455","title":"Use of KROQI as a Level-2 Common Data Environment in the French Construction Industry","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Variety (cybernetics); Work (physics); Plan (archaeology); Government (linguistics); Construction industry; Computer science; Knowledge management; Business; Process management; Engineering; Construction engineering; Artificial intelligence","score_opus":0.038944876362880396,"score_gpt":0.25142612384866186,"score_spread":0.21248124748578145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293169025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88478506,0.00053605577,0.060975116,0.003843902,0.00005391062,0.0003900285,0.00014080261,0.00027596462,0.048999228],"genre_scores_gemma":[0.9690973,0.00019408051,0.027742218,0.00017420291,0.000004600955,0.00009849197,0.00008471168,0.000027717104,0.002576651],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9910114,0.0045135925,0.00043687053,0.00066282926,0.0024194415,0.0009559258],"domain_scores_gemma":[0.9946516,0.0017995496,0.00076833845,0.00085780345,0.0011188741,0.0008038656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008376749,0.00040588362,0.00028585267,0.0022725232,0.0032514266,0.008183876,0.00079915323,0.0008838737,0.0024210417],"category_scores_gemma":[0.009103863,0.00032078967,0.00047358137,0.0024796417,0.004901834,0.0045010797,0.006411344,0.0010593175,0.0005058417],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034061482,0.00050098606,0.07220851,0.0009363705,0.00006933617,0.0010680454,0.25077474,0.0054853987,0.02538551,0.36327955,0.004718301,0.27523264],"study_design_scores_gemma":[0.00010671558,0.001978405,0.14326836,0.000997145,0.000112616355,0.0021671846,0.41660196,0.026989734,0.013883525,0.05658997,0.3367879,0.00051648624],"about_ca_topic_score_codex":0.02088656,"about_ca_topic_score_gemma":0.030367333,"teacher_disagreement_score":0.02088656,"about_ca_system_score_codex":0.006627663,"about_ca_system_score_gemma":0.008398312,"threshold_uncertainty_score":0.0480873},"labels":[],"label_agreement":null},{"id":"W4293222198","doi":"10.1016/j.jcsr.2022.107464","title":"Structural performance of registration pin connection in VectorBloc modular construction system","year":2022,"lang":"en","type":"article","venue":"Journal of Constructional Steel Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Connection (principal bundle); Structural engineering; Modular construction; Computer science; Engineering; Engineering drawing; Programming language","score_opus":0.029506473824582824,"score_gpt":0.27273287649939837,"score_spread":0.24322640267481554,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293222198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9848798,0.00006030884,0.010058305,0.00001780585,0.000028720951,0.000015984244,0.000115273295,0.0004374376,0.0043864506],"genre_scores_gemma":[0.9983158,0.000014071277,0.0005459051,0.0000022048557,0.0000010038796,0.0000046093764,0.000083136976,0.000010908193,0.0010224141],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996092,0.00004956093,0.000016646823,0.00008170515,0.0001458495,0.000097095115],"domain_scores_gemma":[0.9994716,0.00008986827,0.000060461713,0.00008168673,0.00024986273,0.000046558704],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00038886658,0.0006123789,0.00043709288,0.0007182737,0.00048635274,0.00051701884,0.0008249493,0.00061233656,0.008045116],"category_scores_gemma":[0.0007373116,0.00026609504,0.0003614739,0.0006158336,0.0003333398,0.00059661816,0.0005246166,0.0002134013,0.0011143459],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006150927,0.00056846824,0.020418553,0.00053061027,0.00012083856,0.0007844847,0.00078528153,0.50420886,0.287359,0.0035548417,0.0036399318,0.17187813],"study_design_scores_gemma":[0.00011354087,0.0046595144,0.06522834,0.000048213602,0.0002866007,0.00035146644,0.000949792,0.766355,0.15657866,0.0008337936,0.0044915727,0.00010350592],"about_ca_topic_score_codex":0.0033906826,"about_ca_topic_score_gemma":0.002871807,"teacher_disagreement_score":0.008045116,"about_ca_system_score_codex":0.00037695165,"about_ca_system_score_gemma":0.00043078102,"threshold_uncertainty_score":0.026913583},"labels":[],"label_agreement":null},{"id":"W4293272017","doi":"10.1108/ci-08-2017-0070","title":"Innovation transfer in construction: re-interpreting factor-based research from the perspective of the social construction of technology (SCOT)","year":2022,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Royal Roads University","funders":"","keywords":"Context (archaeology); Knowledge management; Technological change; Set (abstract data type); Process (computing); Empirical research; Perspective (graphical); Management science; Business; Computer science; Engineering; Epistemology","score_opus":0.03774916421237179,"score_gpt":0.29467117066990417,"score_spread":0.2569220064575324,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293272017","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27514762,0.015088523,0.557137,0.012220504,0.0011048594,0.001246757,0.00035620306,0.0003450947,0.13735346],"genre_scores_gemma":[0.9356445,0.0032904118,0.058384493,0.00036625876,0.000103952494,0.00045390904,0.00008567453,0.000089589324,0.0015811633],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9751516,0.018844904,0.00094089395,0.0014450084,0.0027804603,0.00083704555],"domain_scores_gemma":[0.94550496,0.0442748,0.001946941,0.005404288,0.0025029287,0.00036618186],"candidate_categories":["sts"],"consensus_categories":[],"category_scores_codex":[0.02965133,0.0018709546,0.0015359318,0.011436314,0.0036623997,0.013993189,0.0026965034,0.0021103574,0.0031669557],"category_scores_gemma":[0.033443846,0.00073042436,0.0016532999,0.009225866,0.042263683,0.014309033,0.0070280456,0.003866488,0.00028880793],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008117083,0.00010616589,0.0064267195,0.0015633634,0.00011495231,0.0007564738,0.18971878,0.0050607855,0.0010308767,0.71710396,0.0010738785,0.076962925],"study_design_scores_gemma":[0.000045936813,0.0002051611,0.008061794,0.0025315732,0.00016082115,0.0007917593,0.19229668,0.009729709,0.0015563606,0.7054244,0.079080135,0.000115748786],"about_ca_topic_score_codex":0.0055616167,"about_ca_topic_score_gemma":0.0044054845,"teacher_disagreement_score":0.9963376,"about_ca_system_score_codex":0.010457286,"about_ca_system_score_gemma":0.0061562727,"threshold_uncertainty_score":0.15681309},"labels":[],"label_agreement":null},{"id":"W4293566659","doi":"10.1108/sasbe-03-2022-0050","title":"Industry 4.0 and the circular economy: using design-stage digital technology to reduce construction waste","year":2022,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":121,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Reuse; Circular economy; Originality; Big data; Analytics; Design technology; Engineering; Computer science; Engineering management; Manufacturing engineering; Systems engineering; Data science; Waste management","score_opus":0.007369698120115759,"score_gpt":0.18879370697762007,"score_spread":0.18142400885750432,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293566659","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4249131,0.0100021055,0.2785652,0.011193067,0.0002728287,0.0010646072,0.00014188481,0.0004970137,0.27335012],"genre_scores_gemma":[0.85860443,0.0050047017,0.123299524,0.0012023222,0.000037645783,0.00046554752,0.00013520075,0.0001396919,0.011110979],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9901265,0.0066053225,0.00035251945,0.00042144905,0.0019402258,0.0005539862],"domain_scores_gemma":[0.986778,0.008358852,0.0014474805,0.001667422,0.0014071396,0.00034103202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012168519,0.0007091481,0.00045056635,0.004262645,0.0020366053,0.0072244112,0.0017872032,0.0013623805,0.0053969906],"category_scores_gemma":[0.013404535,0.00045783632,0.0007133128,0.0035298613,0.008249242,0.007839776,0.006501494,0.0014110289,0.0007372466],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023864495,0.0005758898,0.016520018,0.0027998872,0.000086186104,0.00054035947,0.035473086,0.010219836,0.0060865865,0.3952998,0.0038663708,0.5282932],"study_design_scores_gemma":[0.0001229911,0.0017254093,0.016826898,0.0058946596,0.0002214974,0.00095146,0.095562585,0.016896551,0.027881097,0.3514589,0.48226622,0.00019178182],"about_ca_topic_score_codex":0.0022827836,"about_ca_topic_score_gemma":0.0034861132,"teacher_disagreement_score":0.012168519,"about_ca_system_score_codex":0.0055436804,"about_ca_system_score_gemma":0.0115237385,"threshold_uncertainty_score":0.064354},"labels":[],"label_agreement":null},{"id":"W4293762666","doi":"10.24928/2022/0213","title":"Framework for Using LPS in Design on IPD Projects","year":2022,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science","score_opus":0.05839863043142912,"score_gpt":0.2703512992626354,"score_spread":0.21195266883120628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293762666","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0015428836,0.000106938285,0.99012274,0.00023224308,0.000017430528,0.0003378582,0.0001448663,0.0014537746,0.0060413424],"genre_scores_gemma":[0.026808968,0.00026078415,0.9693666,0.000046017354,0.000012043262,0.0005566863,0.00039379502,0.00014199266,0.0024130843],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9935688,0.0026572836,0.0008554766,0.0008269133,0.0016310413,0.00046046474],"domain_scores_gemma":[0.99747306,0.0007682294,0.00033227445,0.0006467302,0.0005379923,0.00024184318],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006296716,0.0013843378,0.00069618056,0.0055843666,0.0014344935,0.0055826483,0.0034595171,0.0016379764,0.007832105],"category_scores_gemma":[0.0052804775,0.0011459963,0.00271485,0.0035169187,0.002221768,0.0045154863,0.005854347,0.0020392847,0.0027325114],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009478649,0.00028507304,0.0028789283,0.00093404885,0.00010106476,0.0007626459,0.0025037408,0.12658143,0.00560011,0.62933666,0.0050964765,0.22582498],"study_design_scores_gemma":[0.0001010878,0.00026515988,0.0013442956,0.0011241274,0.00015812964,0.00082640233,0.0017207459,0.4630482,0.0072940984,0.23539798,0.28851882,0.00020095974],"about_ca_topic_score_codex":0.0085525345,"about_ca_topic_score_gemma":0.0145257255,"teacher_disagreement_score":0.0085525345,"about_ca_system_score_codex":0.0030077014,"about_ca_system_score_gemma":0.0060740146,"threshold_uncertainty_score":0.03330058},"labels":[],"label_agreement":null},{"id":"W4293762779","doi":"10.24928/2022/0112","title":"Assembly Process in Off-Site Construction: Self-Lock Device as a Key to a Lean Approach","year":2022,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Natural Sciences and Engineering Research Council of Canada; Université Laval","funders":"","keywords":"Modular design; Timeline; Lock (firearm); Process (computing); Key (lock); Computer science; Plug and play; Engineering; Systems engineering; Manufacturing engineering; Mechanical engineering; Operating system","score_opus":0.013190068605602482,"score_gpt":0.23380815697481883,"score_spread":0.22061808836921634,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293762779","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07696373,0.00060299353,0.8985646,0.00028939592,0.00015147036,0.00022948862,0.000053774165,0.0017023492,0.021442214],"genre_scores_gemma":[0.54509425,0.0006518923,0.4422655,0.00016391726,0.000046234807,0.00021309571,0.00016425496,0.00036878078,0.011032077],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99779046,0.00050298066,0.00010002321,0.00028876396,0.0011607626,0.0001569412],"domain_scores_gemma":[0.9980326,0.00061810034,0.00027963938,0.00056458113,0.00039275095,0.00011240459],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018458008,0.0006458182,0.000495276,0.0010862682,0.0007787135,0.0024711406,0.001702348,0.0010768946,0.003435277],"category_scores_gemma":[0.0022032263,0.0004986283,0.00062308804,0.00069588306,0.0013746552,0.002288132,0.0019055579,0.001024914,0.0017024308],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008785887,0.001235486,0.0070520113,0.0012533166,0.000060069477,0.0010718575,0.0031136912,0.06939178,0.34099206,0.1085159,0.0029919914,0.46344322],"study_design_scores_gemma":[0.00014101267,0.0023626934,0.008231522,0.00056144345,0.00013178945,0.0017773906,0.0013223808,0.30836982,0.4892477,0.042896137,0.14471632,0.00024174551],"about_ca_topic_score_codex":0.000557673,"about_ca_topic_score_gemma":0.0006215616,"teacher_disagreement_score":0.003435277,"about_ca_system_score_codex":0.0006015853,"about_ca_system_score_gemma":0.0011275923,"threshold_uncertainty_score":0.011492193},"labels":[],"label_agreement":null},{"id":"W4293771037","doi":"10.3390/buildings12091337","title":"Integration of Building Information Modeling (BIM) and Virtual Design and Construction (VDC) with Stick-Built Construction to Implement Digital Construction: A Canadian General Contractor’s Perspective","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Building information modeling; Engineering; Perspective (graphical); Promotion (chess); Construction management; Benchmark (surveying); Construction industry; Construction engineering; Engineering management; Process management; Systems engineering; Civil engineering; Computer science; Operations management","score_opus":0.00897431499596008,"score_gpt":0.20584614462891218,"score_spread":0.1968718296329521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293771037","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30500978,0.008965339,0.03804092,0.032566756,0.00022478055,0.0006061191,0.00041468508,0.00027557532,0.61389595],"genre_scores_gemma":[0.9357345,0.0045192274,0.0373879,0.0009810579,0.000016795106,0.00007191705,0.00017316421,0.00004993163,0.021065468],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99033797,0.0019613148,0.00021628449,0.0004761357,0.005105441,0.0019029669],"domain_scores_gemma":[0.99583495,0.00063798064,0.00024421382,0.00028031663,0.0020442724,0.00095834414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005571431,0.0006918886,0.00033389704,0.0044500274,0.011034502,0.008303405,0.0021316337,0.0011616107,0.003704765],"category_scores_gemma":[0.0056643486,0.0004452963,0.0003745406,0.007974795,0.012326436,0.0024035012,0.005844758,0.002005926,0.00023811677],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011297651,0.00037312895,0.051614437,0.00063956674,0.00005881879,0.0014234068,0.09274412,0.0063318624,0.0054966235,0.4043084,0.018925317,0.41797134],"study_design_scores_gemma":[0.000030821226,0.00020195066,0.10735678,0.0009767158,0.00009625118,0.0008560725,0.16777243,0.00861468,0.004196422,0.018513607,0.6911708,0.0002134479],"about_ca_topic_score_codex":0.98520654,"about_ca_topic_score_gemma":0.99347806,"teacher_disagreement_score":0.12042053,"about_ca_system_score_codex":0.12042053,"about_ca_system_score_gemma":0.19675672,"threshold_uncertainty_score":0.8737162},"labels":[],"label_agreement":null},{"id":"W4293791618","doi":"10.35199/epde.2022.27","title":"PERFECTION VS IMPERFECTION - EVOLVING PERCEPTUAL QUALITIES OF CONCRETE","year":2022,"lang":"en","type":"article","venue":"DS 117: Proceedings of the 24th International Conference on Engineering and Product Design Education (E&amp;PDE 2022), London South Bank University in London, UK. 8th - 9th September 2022","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Perfection; Perception; Computer science; Artificial intelligence; Psychology; Epistemology","score_opus":0.017709684060276922,"score_gpt":0.21720000706236,"score_spread":0.19949032300208308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293791618","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9625962,0.0006671823,0.011843464,0.00024272513,0.000040524774,0.000022892633,0.00004009656,0.00005746323,0.02448943],"genre_scores_gemma":[0.9975091,0.00012690136,0.0013752076,0.000023788662,0.000005802766,0.000003962135,0.0000129541,0.000013343148,0.0009287951],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99931455,0.00016336687,0.000036299785,0.000100000645,0.00031082405,0.00007491831],"domain_scores_gemma":[0.99860364,0.0005065618,0.00029798865,0.00014647043,0.00027196106,0.00017337519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001112254,0.00024547082,0.0001468841,0.0007476734,0.0002867849,0.0015855898,0.00023538974,0.00047908188,0.0021563752],"category_scores_gemma":[0.0047427053,0.00022405933,0.0002607549,0.00025791148,0.001888795,0.002303128,0.0018139759,0.0005558838,0.00019431466],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017713833,0.00014687145,0.1411301,0.0012684437,0.00022132801,0.0019463514,0.31163657,0.0048244316,0.27479887,0.049998287,0.0022919402,0.20996547],"study_design_scores_gemma":[0.000056419565,0.0022847299,0.7449565,0.00041373933,0.00026632918,0.0065674623,0.13584346,0.0075239325,0.01832156,0.042502742,0.040939618,0.0003234687],"about_ca_topic_score_codex":0.0009221433,"about_ca_topic_score_gemma":0.00091251545,"teacher_disagreement_score":0.0021563752,"about_ca_system_score_codex":0.00032918158,"about_ca_system_score_gemma":0.00017915656,"threshold_uncertainty_score":0.0072137713},"labels":[],"label_agreement":null},{"id":"W4293842690","doi":"10.1139/cjce-2022-0185","title":"Optimization of earthworks planning: a systematic mapping study","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Transport Canada","funders":"","keywords":"Earthworks; Scheduling (production processes); Integer programming; Linear programming; Computer science; Operations research; Mathematical optimization; Engineering; Operations management; Mathematics","score_opus":0.008980381808298047,"score_gpt":0.1714537871525568,"score_spread":0.16247340534425875,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4293842690","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018304149,0.9594257,0.012942942,0.0013728982,0.00019946549,0.0012331974,0.0010977834,0.00007602133,0.005347988],"genre_scores_gemma":[0.15037894,0.8201727,0.025498146,0.00068104954,0.00015420679,0.0014349144,0.0010003017,0.00004853216,0.00063117483],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9878693,0.0061118896,0.0025398976,0.00091337477,0.0022535508,0.00031194367],"domain_scores_gemma":[0.9164612,0.0684095,0.005515455,0.0016062787,0.0075970874,0.0004104901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.018616496,0.0014128583,0.0030894128,0.025430344,0.00081416295,0.0033706133,0.0011888519,0.0011797673,0.003132722],"category_scores_gemma":[0.06744918,0.0010706016,0.004234458,0.027195761,0.00095158454,0.0028345776,0.0014383196,0.0010435793,0.00039221917],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003608109,0.00019604605,0.007873883,0.47018167,0.006343511,0.000734672,0.0021254474,0.008970543,0.0011357995,0.011728162,0.0060782065,0.48427126],"study_design_scores_gemma":[0.00046290303,0.0019600156,0.023034964,0.6978692,0.033272896,0.0020917132,0.007503941,0.011364955,0.003422578,0.018855345,0.19989574,0.00026579827],"about_ca_topic_score_codex":0.010407371,"about_ca_topic_score_gemma":0.017953325,"teacher_disagreement_score":0.025430344,"about_ca_system_score_codex":0.004029886,"about_ca_system_score_gemma":0.020650338,"threshold_uncertainty_score":0.098454654},"labels":[],"label_agreement":null},{"id":"W4296077643","doi":"10.29173/mocs286","title":"Operations management concepts applied to offsite construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Productivity; Construction management; Construction engineering; Construction industry; Production (economics); Risk analysis (engineering); Architecture; Engineering; Engineering management; Systems engineering; Computer science; Business; Civil engineering","score_opus":0.0052091785366271265,"score_gpt":0.1940127567568409,"score_spread":0.18880357822021376,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077643","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04110535,0.007557453,0.65736836,0.006156175,0.001068383,0.00045409132,0.0001072208,0.00016661413,0.28601635],"genre_scores_gemma":[0.6589696,0.009943976,0.2961486,0.0014300586,0.0007861979,0.00077250163,0.00015580212,0.00008343774,0.03170998],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99712616,0.001504183,0.0002255186,0.00023411543,0.0007080767,0.00020194468],"domain_scores_gemma":[0.9977216,0.0011882561,0.00043969083,0.00018112047,0.00034893013,0.00012033623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00287196,0.001194015,0.00042565344,0.0042995717,0.0016317602,0.0053143017,0.001164915,0.0014929425,0.0047606095],"category_scores_gemma":[0.0033438604,0.00031407125,0.00073977985,0.004480798,0.006711164,0.0038864329,0.003308186,0.0024867533,0.00046778374],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012159236,0.000041071646,0.0005208226,0.00016121165,0.000008444865,0.00021278538,0.0020784086,0.0039852257,0.00057907624,0.9451017,0.000862374,0.04643673],"study_design_scores_gemma":[0.000015729083,0.00016755957,0.0025957867,0.0007388589,0.000021760541,0.000590095,0.007109994,0.022436973,0.0012476416,0.79377997,0.17123994,0.00005570321],"about_ca_topic_score_codex":0.0038329803,"about_ca_topic_score_gemma":0.0032856443,"teacher_disagreement_score":0.0053143017,"about_ca_system_score_codex":0.0037829357,"about_ca_system_score_gemma":0.0038874685,"threshold_uncertainty_score":0.027447283},"labels":[],"label_agreement":null},{"id":"W4296077796","doi":"10.29173/mocs285","title":"VDC management in the industrialization process using prefabricated reinforcement cages. Case Study: Ovalo Monitor Bridge","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Constructability; Industrialisation; Bridge (graph theory); Prefabrication; Engineering; Construction engineering; Process (computing); Civil engineering; Structural engineering; Computer science","score_opus":0.026368304651567462,"score_gpt":0.24863909518441432,"score_spread":0.22227079053284687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077796","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94937307,0.000085143445,0.037178483,0.00016225189,0.0000057073676,0.00031898616,0.000051643787,0.00038755787,0.012437314],"genre_scores_gemma":[0.9684796,0.00005373431,0.028948886,0.000012869376,0.0000019990398,0.00008870932,0.00007151915,0.000026670674,0.0023160714],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99893314,0.00048913655,0.00003502333,0.00012645942,0.00020154631,0.00021471483],"domain_scores_gemma":[0.9989831,0.00031624924,0.00014523641,0.00020254914,0.00016590727,0.00018692545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015603014,0.00035727926,0.00013044065,0.00075717416,0.0008951277,0.00088253914,0.0007317948,0.0006956702,0.0020395517],"category_scores_gemma":[0.0017129871,0.00020929657,0.00028858363,0.0006932308,0.00075376505,0.0008344142,0.001597326,0.00035364754,0.00026734793],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000867834,0.0031323114,0.13126183,0.00054895034,0.00007945414,0.010312817,0.016825408,0.1799131,0.114295214,0.02369888,0.00290145,0.5161628],"study_design_scores_gemma":[0.00035032455,0.005661422,0.17746153,0.00027430733,0.00020010569,0.0045408644,0.027461767,0.58081454,0.09351035,0.007597756,0.10192861,0.00019846688],"about_ca_topic_score_codex":0.0083641,"about_ca_topic_score_gemma":0.013380902,"teacher_disagreement_score":0.0083641,"about_ca_system_score_codex":0.0015093266,"about_ca_system_score_gemma":0.0021426426,"threshold_uncertainty_score":0.016630828},"labels":[],"label_agreement":null},{"id":"W4296077905","doi":"10.29173/mocs270","title":"Automated BIM-based CNC file generator for wood panel framing machines in construction manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Framing (construction); Software; Automation; Numerical control; Computer science; Building information modeling; Information model; Software engineering; Manufacturing engineering; Engineering drawing; Engineering; Mechanical engineering; Operating system","score_opus":0.009069530823881115,"score_gpt":0.19347044105629005,"score_spread":0.18440091023240893,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077905","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008006817,0.00009407131,0.97204393,0.00008623097,0.000071243994,0.00036472504,0.00055024406,0.013048471,0.005734208],"genre_scores_gemma":[0.1345284,0.00015586008,0.8571525,0.000059656257,0.00002579742,0.0005694278,0.0016802319,0.0011960753,0.004632076],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985719,0.0001857011,0.00008007497,0.00022625085,0.0008455155,0.000090528694],"domain_scores_gemma":[0.9987796,0.00034932827,0.000097480006,0.00027734693,0.00045026178,0.00004587544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012382227,0.0009457235,0.000697923,0.0020658083,0.0005827922,0.0012809194,0.0022675034,0.00084928534,0.013082674],"category_scores_gemma":[0.0030342324,0.0006190375,0.00072312437,0.0011126922,0.0005375809,0.0011259527,0.0013052454,0.000720961,0.0041496],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00050196814,0.00021813539,0.0032040887,0.0006615612,0.000043856886,0.00078266644,0.0006658745,0.1322603,0.050148454,0.023516765,0.028727647,0.75926864],"study_design_scores_gemma":[0.000081899976,0.00015551463,0.0023929777,0.00010735193,0.000028700946,0.0006729445,0.00016739877,0.85757154,0.07456003,0.0053974995,0.05875904,0.000105047984],"about_ca_topic_score_codex":0.0022231108,"about_ca_topic_score_gemma":0.0023999515,"teacher_disagreement_score":0.013082674,"about_ca_system_score_codex":0.0006904454,"about_ca_system_score_gemma":0.0012540395,"threshold_uncertainty_score":0.043765962},"labels":[],"label_agreement":null},{"id":"W4296077909","doi":"10.29173/mocs288","title":"Front matter, 2022 Proceedings of the Modular and Offsite Construction Summit","year":2022,"lang":"en","type":"paratext","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Summit; Modular design; Front (military); Modular construction; Engineering; Library science; Computer science; Geography; Mechanical engineering; Physical geography; Operating system","score_opus":0.004970221250371859,"score_gpt":0.179135614013074,"score_spread":0.17416539276270215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296077909","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00089629926,0.0017544461,0.0005095577,0.007072384,0.013847722,0.000060196548,0.0021056423,0.00027949407,0.97347414],"genre_scores_gemma":[0.0020207195,0.000770434,0.0001948304,0.00046686066,0.00073919597,0.000017883409,0.000994852,0.00012566368,0.9946696],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990891,0.000051101128,0.00002731857,0.000077743476,0.00062958774,0.00012521181],"domain_scores_gemma":[0.99873275,0.000101107405,0.000024064153,0.00006696725,0.00056508067,0.0005100942],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0011162232,0.0008430816,0.00042456802,0.0013116584,0.0020956048,0.005602224,0.00074985897,0.0018011729,0.5999786],"category_scores_gemma":[0.0020370956,0.00021041006,0.00031003891,0.001297678,0.0007982532,0.0015433186,0.0023111987,0.0015041356,0.3550577],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001569069,0.000010861836,0.000098022116,0.00003619269,7.882317e-7,0.000023605699,0.00003416784,0.00003109522,0.00010932749,0.0008899857,0.975927,0.022823159],"study_design_scores_gemma":[0.0000020010784,0.0000035748412,0.00039090405,0.000034524313,6.9841997e-7,0.000013246878,0.00009046661,0.000022420281,0.00005886095,0.00026543858,0.9991154,0.0000023826956],"about_ca_topic_score_codex":0.032493524,"about_ca_topic_score_gemma":0.13504796,"teacher_disagreement_score":0.5999786,"about_ca_system_score_codex":0.0030136898,"about_ca_system_score_gemma":0.004163416,"threshold_uncertainty_score":0.5705819},"labels":[],"label_agreement":null},{"id":"W4296078332","doi":"10.29173/mocs263","title":"Iot-based architecture to improve workflow in bricks manufacturing","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Workflow; Automation; Internet of Things; Architecture; Computer science; Quality (philosophy); Production (economics); Manufacturing engineering; Process (computing); Business; Process management; Database; World Wide Web; Engineering; Operating system","score_opus":0.0037848789348729115,"score_gpt":0.17216495140487134,"score_spread":0.16838007246999842,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078332","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.050623305,0.00042767174,0.92105603,0.0008238417,0.00015596474,0.00029727735,0.000114152484,0.0043807956,0.022121],"genre_scores_gemma":[0.5218818,0.0011824919,0.46244568,0.00030415278,0.000054331478,0.00028879856,0.0006532352,0.00038388392,0.012805567],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99922395,0.00021142233,0.000081378676,0.00012809967,0.00023796524,0.00011717613],"domain_scores_gemma":[0.9995778,0.00007508398,0.00004589319,0.00011668116,0.000102249076,0.00008234504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012533242,0.0004433839,0.0002770387,0.00089621486,0.00078417256,0.0020036937,0.0010592731,0.00093779387,0.0021570718],"category_scores_gemma":[0.000971615,0.00030140384,0.0006896927,0.0007708766,0.00073439686,0.0019474641,0.0025171405,0.00084303226,0.0009651759],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071295653,0.0009105713,0.0071159154,0.0008108639,0.0001618754,0.00220797,0.005557107,0.2142861,0.12926932,0.21796834,0.013391744,0.40760714],"study_design_scores_gemma":[0.000097053395,0.0003551041,0.0065194373,0.00039710684,0.0001548581,0.0008253969,0.0013831025,0.64767283,0.047247507,0.095184885,0.20004527,0.00011739553],"about_ca_topic_score_codex":0.0026304917,"about_ca_topic_score_gemma":0.0029399698,"teacher_disagreement_score":0.0026304917,"about_ca_system_score_codex":0.0007649889,"about_ca_system_score_gemma":0.0015967208,"threshold_uncertainty_score":0.007216096},"labels":[],"label_agreement":null},{"id":"W4296078947","doi":"10.29173/mocs258","title":"A proposed conceptual framework for Computational Design Sustainability in Industrialized Building","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Underpinning; Mainstream; Context (archaeology); Satisficing; Management science; Conceptual framework; Computer science; Knowledge management; Process management; Risk analysis (engineering); Engineering; Business; Political science; Sociology; Civil engineering","score_opus":0.017388451956763723,"score_gpt":0.2360175156321324,"score_spread":0.2186290636753687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296078947","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015252169,0.0020380383,0.84268737,0.013330541,0.00021620389,0.00032978415,0.00036338513,0.00037046534,0.12541209],"genre_scores_gemma":[0.50726503,0.0018001221,0.47579095,0.0011459554,0.00014509184,0.0012700964,0.00054906117,0.00011830198,0.011915385],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9971866,0.0016297526,0.00015000108,0.00044643847,0.00037093385,0.00021630501],"domain_scores_gemma":[0.99719256,0.0014821503,0.00026897708,0.00030158498,0.0004636829,0.0002909734],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004982631,0.0010121593,0.0005777783,0.0043207007,0.0022548125,0.008167671,0.0041318582,0.0033623464,0.010156471],"category_scores_gemma":[0.00466977,0.00054600945,0.001586687,0.004101154,0.0131925745,0.008905064,0.004338572,0.0029737712,0.0009985898],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000014551771,0.0000064494407,0.00011742617,0.000027797212,0.000003046904,0.000031934982,0.0006066393,0.0012878348,0.000028702163,0.9958326,0.00025244744,0.0018036839],"study_design_scores_gemma":[0.000011626684,0.000013354109,0.0001978227,0.00015838347,0.000011794437,0.000110679204,0.0017814497,0.013403972,0.00008580509,0.94343597,0.04077706,0.000012054678],"about_ca_topic_score_codex":0.0064341873,"about_ca_topic_score_gemma":0.0067119584,"teacher_disagreement_score":0.010156471,"about_ca_system_score_codex":0.004988268,"about_ca_system_score_gemma":0.004958242,"threshold_uncertainty_score":0.036192596},"labels":[],"label_agreement":null},{"id":"W4296079369","doi":"10.29173/mocs278","title":"A principal component analysis of Organisational BIM Implementation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nonprobability sampling; Building information modeling; Status quo; Process management; Yardstick; Process (computing); Knowledge management; Principal (computer security); Construction industry; Business; Competitive advantage; Computer science; Operations management; Engineering; Construction engineering; Marketing","score_opus":0.007207543096686039,"score_gpt":0.20973705302531076,"score_spread":0.20252950992862473,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079369","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.83545667,0.00012526482,0.117910065,0.00073066086,0.00019993109,0.003966971,0.0026818225,0.001406489,0.037522182],"genre_scores_gemma":[0.90763426,0.0001223225,0.08017442,0.00004318852,0.000027803188,0.0029156257,0.0019063356,0.00020005356,0.0069759768],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99193513,0.003261622,0.0005056854,0.0007763872,0.0030624943,0.00045871592],"domain_scores_gemma":[0.9845946,0.006307049,0.00094458385,0.0013289958,0.006499154,0.00032559378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00611563,0.0009982451,0.0006830865,0.0037753223,0.0011388616,0.003023875,0.000716272,0.00055805163,0.00830223],"category_scores_gemma":[0.028341495,0.00046055362,0.000986778,0.0061817043,0.00080942037,0.0010740458,0.0019421745,0.001129458,0.0018318038],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011044618,0.0013845679,0.2317164,0.00088612264,0.00066756766,0.0003263132,0.021678723,0.013886416,0.009224275,0.022433694,0.013014703,0.6836767],"study_design_scores_gemma":[0.000115198214,0.0014890827,0.83946246,0.0002440142,0.000375267,0.00020272961,0.018118821,0.092839606,0.006540084,0.006591661,0.033795,0.00022611898],"about_ca_topic_score_codex":0.009277361,"about_ca_topic_score_gemma":0.005122633,"teacher_disagreement_score":0.009277361,"about_ca_system_score_codex":0.0015631634,"about_ca_system_score_gemma":0.004221904,"threshold_uncertainty_score":0.03234291},"labels":[],"label_agreement":null},{"id":"W4296079407","doi":"10.29173/mocs265","title":"Lessons Learned from adopting modular construction in Brazil: A startup journey","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Standardization; Business; Revenue; Variety (cybernetics); Scale (ratio); Investment (military); Product (mathematics); Marketing; New product development; Start up; Operations management; Process management; Engineering management; Engineering; Finance; Computer science; Political science; Business administration","score_opus":0.021997019170221628,"score_gpt":0.23070827472586747,"score_spread":0.20871125555564585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9387191,0.0022106778,0.0045058937,0.019710321,0.00016237283,0.00022872354,0.00006898838,0.000057729525,0.034336176],"genre_scores_gemma":[0.9819,0.0025757393,0.0040729544,0.0014364423,0.000024453215,0.000075883145,0.000048569058,0.000054493157,0.009811481],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9956333,0.0023071046,0.00013150957,0.0003476117,0.000706311,0.0008741399],"domain_scores_gemma":[0.99507904,0.0019916217,0.00040386242,0.00023338004,0.000800634,0.0014914202],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0064228354,0.0005558904,0.00046194502,0.0010395378,0.0069009685,0.0056900145,0.0014302955,0.0019461716,0.0033095132],"category_scores_gemma":[0.009175764,0.00062210095,0.0004595069,0.001150357,0.00606179,0.004391803,0.007807392,0.003460847,0.00047909352],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030325999,0.0002237075,0.013254706,0.0003347031,0.000008542119,0.0061769034,0.90467685,0.00032201747,0.001958965,0.021967325,0.003934258,0.047111575],"study_design_scores_gemma":[0.0000064128944,0.00015994515,0.007425288,0.000681116,0.0000079042375,0.0015084395,0.85540676,0.00035320708,0.0005678238,0.0034686448,0.13037466,0.00003982322],"about_ca_topic_score_codex":0.023402888,"about_ca_topic_score_gemma":0.06633037,"teacher_disagreement_score":0.023402888,"about_ca_system_score_codex":0.007121098,"about_ca_system_score_gemma":0.009625181,"threshold_uncertainty_score":0.05166745},"labels":[],"label_agreement":null},{"id":"W4296079452","doi":"10.29173/mocs283","title":"Layout modelling of the built environment for autonomous mobile robots using Building Information Modelling (BIM) and simulation","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Robot; Building information modeling; Mobile robot; Robotics; Computer science; A priori and a posteriori; Systems engineering; Artificial intelligence; Human–computer interaction; Control engineering; Simulation; Engineering","score_opus":0.01766596912926466,"score_gpt":0.19896615713084348,"score_spread":0.18130018800157882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079452","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02055761,0.00009482526,0.97212684,0.000071092734,0.00002602403,0.000078073994,0.00023397584,0.0012562546,0.0055553154],"genre_scores_gemma":[0.49957544,0.000453905,0.49345908,0.000039260314,0.000015248339,0.0004008579,0.0009102395,0.00034312706,0.00480283],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967194,0.00008491583,0.000022698869,0.000051257044,0.00014156722,0.000027735907],"domain_scores_gemma":[0.9997111,0.000116888405,0.000040134284,0.000051921626,0.00006138282,0.000018525148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003528886,0.00078865926,0.00067254156,0.0009184867,0.0005938148,0.0013671097,0.001078285,0.0008631179,0.0036996242],"category_scores_gemma":[0.00091368955,0.00065217627,0.00096068,0.00077665143,0.0005234498,0.0008181838,0.0012746159,0.0005107338,0.0009328933],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001884585,0.000023570978,0.0007310003,0.00007599508,0.000012581478,0.00010513928,0.00013070677,0.9706378,0.0025146261,0.0046215383,0.00040318194,0.020725062],"study_design_scores_gemma":[0.0000059474296,0.000014185615,0.00029215304,0.0000149658745,0.000007933624,0.00005215679,0.00005611585,0.9933119,0.0010786164,0.0019091201,0.0032458415,0.000011135172],"about_ca_topic_score_codex":0.009017015,"about_ca_topic_score_gemma":0.012459213,"teacher_disagreement_score":0.009017015,"about_ca_system_score_codex":0.00054342847,"about_ca_system_score_gemma":0.0013886627,"threshold_uncertainty_score":0.017929077},"labels":[],"label_agreement":null},{"id":"W4296079866","doi":"10.29173/mocs255","title":"Design-for-Manufacturing-and-Assembly (DfMA) for the construction industry: A review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal; Polytechnique Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Engineering; Systematic review; Construction industry; Computer science; Engineering management; Manufacturing engineering; Construction engineering","score_opus":0.04268418942031275,"score_gpt":0.2647113452291091,"score_spread":0.22202715580879637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296079866","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00011621179,0.9986035,0.00017344678,0.00020698429,0.000104362305,0.000010957239,0.000013016959,0.000004128833,0.00076748047],"genre_scores_gemma":[0.0010789097,0.9981845,0.00039346688,0.00011913649,0.000050126222,0.000015040464,0.000016474982,0.0000019070284,0.0001404691],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99824727,0.00042684565,0.00040292786,0.00017602413,0.0006753998,0.0000714533],"domain_scores_gemma":[0.9931953,0.0048349886,0.0006697782,0.00012174162,0.0010400097,0.00013815842],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002795699,0.0011733124,0.0014561747,0.008387399,0.0007295276,0.0022414844,0.0013024297,0.0019349775,0.0034708176],"category_scores_gemma":[0.006275892,0.0006228707,0.0012142978,0.01161127,0.0009145758,0.0026640033,0.0011697715,0.0014888012,0.0009458106],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028873294,0.000075514436,0.0004838317,0.20185004,0.0002526908,0.00019747167,0.0005064894,0.00043706238,0.0006990464,0.0065155337,0.017078498,0.771875],"study_design_scores_gemma":[0.000012361656,0.00012756971,0.0024981333,0.12190226,0.0007699494,0.0011566281,0.0006718414,0.00016016002,0.00048660138,0.0024268082,0.86974764,0.000039978153],"about_ca_topic_score_codex":0.0054488173,"about_ca_topic_score_gemma":0.012233418,"teacher_disagreement_score":0.008387399,"about_ca_system_score_codex":0.0018872566,"about_ca_system_score_gemma":0.00815523,"threshold_uncertainty_score":0.01478523},"labels":[],"label_agreement":null},{"id":"W4296168386","doi":"10.29173/mocs271","title":"Keyword identification framework for speech communication on construction sites","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Speech recognition; Identification (biology); Mel-frequency cepstrum; Convolutional neural network; Speaker identification; Artificial intelligence; Speaker recognition; Feature extraction","score_opus":0.01208817909986937,"score_gpt":0.21989485929685795,"score_spread":0.20780668019698859,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168386","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058607467,0.0014469924,0.92806935,0.0005054935,0.00014588078,0.00024423166,0.0011227961,0.004842834,0.005014882],"genre_scores_gemma":[0.7186874,0.001247144,0.25768712,0.0003616636,0.00022890729,0.00050158374,0.003536307,0.00030428043,0.017445559],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99937624,0.00009881645,0.0000372308,0.00020873487,0.00018468492,0.00009425121],"domain_scores_gemma":[0.9995115,0.00014391041,0.00007122804,0.000036467263,0.00019847273,0.00003843755],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062677095,0.00092487317,0.0007098453,0.00096681505,0.00046395333,0.00068134384,0.001211816,0.0011143597,0.0023685463],"category_scores_gemma":[0.0013717546,0.00021000722,0.0007606811,0.00050233264,0.00036557313,0.00104795,0.00090589345,0.0010243274,0.0018991585],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009774739,0.0006790163,0.00847731,0.0006779461,0.00021398763,0.0016258878,0.0008839242,0.2726462,0.08324345,0.013259339,0.01650712,0.6008084],"study_design_scores_gemma":[0.000015191347,0.00014295803,0.002364761,0.00002461173,0.000036292528,0.00025513547,0.00024403707,0.9809625,0.007845854,0.0035114922,0.0045583174,0.000038900715],"about_ca_topic_score_codex":0.016168233,"about_ca_topic_score_gemma":0.015553479,"teacher_disagreement_score":0.016168233,"about_ca_system_score_codex":0.0009215175,"about_ca_system_score_gemma":0.001619699,"threshold_uncertainty_score":0.032148242},"labels":[],"label_agreement":null},{"id":"W4296168686","doi":"10.29173/mocs282","title":"A systematic review of quality management of offsite construction","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Policy Innovation and Co-ordination Office","keywords":"Systematic review; Scopus; Quality (philosophy); Popularity; Quality management; Scope (computer science); Business; Knowledge management; Process management; Engineering; Computer science; Operations management; Political science; Management system; MEDLINE","score_opus":0.020881981109741925,"score_gpt":0.2611452180721949,"score_spread":0.24026323696245294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296168686","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00070322515,0.997846,0.0002023184,0.0002340859,0.00011551064,0.00023735264,0.00022101028,0.0000055081136,0.00043500026],"genre_scores_gemma":[0.007016129,0.9913805,0.00070904056,0.00024626142,0.000054413427,0.00031398554,0.00016950502,0.0000035421695,0.000106548614],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9899088,0.0034990571,0.0035749108,0.00065893005,0.0021155109,0.00024280153],"domain_scores_gemma":[0.9654527,0.022594774,0.005847158,0.0005649027,0.0051264353,0.00041407513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009823569,0.0014848051,0.0044296733,0.016450135,0.00093710475,0.0027421361,0.0018124318,0.0017731214,0.0039488752],"category_scores_gemma":[0.04606996,0.0009511065,0.0040816856,0.017319536,0.0009873181,0.0030329607,0.0016719947,0.0011792948,0.00041704913],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008669507,0.000025262016,0.0006198064,0.89359015,0.0020186356,0.00015444504,0.0004300114,0.00010350296,0.00022247956,0.0004124794,0.002900163,0.099436335],"study_design_scores_gemma":[0.000066905624,0.00017473988,0.00382622,0.9267595,0.01405548,0.0004932549,0.0005707533,0.00006892445,0.00026059514,0.00034222845,0.053346362,0.00003505686],"about_ca_topic_score_codex":0.009466137,"about_ca_topic_score_gemma":0.030693013,"teacher_disagreement_score":0.016450135,"about_ca_system_score_codex":0.0042274566,"about_ca_system_score_gemma":0.020887414,"threshold_uncertainty_score":0.05195266},"labels":[],"label_agreement":null},{"id":"W4296272403","doi":"10.29173/mocs284","title":"An holistic approach to product evaluation and selection in industrialised building: Benchmarking of long span, low carbon floor systems","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Melbourne; Monash University; Australian Government","keywords":"Benchmarking; Product (mathematics); Quality (philosophy); Selection (genetic algorithm); Key (lock); Systems engineering; New product development; Computer science; Risk analysis (engineering); Production (economics); Process management; Engineering; Architectural engineering; Construction engineering; Business; Marketing; Artificial intelligence","score_opus":0.017320336266655204,"score_gpt":0.2296527835737729,"score_spread":0.2123324473071177,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.40585038,0.0011146029,0.5473206,0.0013244923,0.000059852093,0.0008124401,0.0002758053,0.00037019418,0.04287174],"genre_scores_gemma":[0.8172139,0.00036541454,0.18100248,0.000062634164,0.000008531299,0.00026763687,0.00010936383,0.000034512243,0.0009355023],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9734072,0.019419724,0.00079560326,0.0006757602,0.0051333415,0.0005684196],"domain_scores_gemma":[0.99039817,0.004676159,0.0009351011,0.0010477371,0.0026082802,0.0003345744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01677096,0.0008233081,0.0010538172,0.004565804,0.0016002221,0.004875658,0.0015908942,0.0008401393,0.0016181313],"category_scores_gemma":[0.020546699,0.0003411514,0.00046256965,0.0059775785,0.00263433,0.0032748529,0.0034218845,0.0009937434,0.00020984748],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00064562995,0.00077356584,0.030237468,0.0013609267,0.00021824233,0.00052107696,0.014450149,0.1811947,0.028051374,0.087846786,0.0024097387,0.6522903],"study_design_scores_gemma":[0.00020442296,0.006747876,0.10163043,0.0015068749,0.00030116524,0.0012428979,0.057422694,0.50841594,0.07076593,0.19565074,0.055538785,0.000572242],"about_ca_topic_score_codex":0.0042131348,"about_ca_topic_score_gemma":0.008522985,"teacher_disagreement_score":0.01677096,"about_ca_system_score_codex":0.0038935721,"about_ca_system_score_gemma":0.004000882,"threshold_uncertainty_score":0.08869439},"labels":[],"label_agreement":null},{"id":"W4296272583","doi":"10.29173/mocs287","title":"Carbon emissions comparison in modular and site-built residential construction","year":2022,"lang":"en","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Modular design; Life-cycle assessment; Prefabrication; Construction waste; Environmental impact assessment; Productivity; Environmental economics; Engineering; Environmental resource management; Business; Production (economics); Environmental planning; Environmental science; Civil engineering; Waste management; Computer science; Economics","score_opus":0.007888409632422756,"score_gpt":0.2051085963982159,"score_spread":0.19722018676579314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272583","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9128108,0.036505558,0.009509415,0.00031206704,0.00009970686,0.00015731184,0.0013705316,0.000050229897,0.039184485],"genre_scores_gemma":[0.98006034,0.011928912,0.004988007,0.0000701198,0.000024224575,0.000072691575,0.0008141983,0.000020770867,0.0020207402],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99905246,0.00024181712,0.0000628757,0.00011190135,0.0004604594,0.00007055914],"domain_scores_gemma":[0.9989573,0.00042444034,0.00015436998,0.000042748074,0.0003955921,0.000025556343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009565677,0.00038522005,0.0002889594,0.0042415666,0.00025691433,0.0012539786,0.0004020155,0.00041588946,0.0015815105],"category_scores_gemma":[0.0013743123,0.00012060202,0.00069347984,0.0048876107,0.00031647072,0.0012057981,0.00053190294,0.00021699545,0.00016210454],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013692167,0.00042310244,0.21310872,0.011778907,0.0010379953,0.0031687561,0.00291784,0.036511105,0.031740718,0.03953196,0.0049534347,0.6534583],"study_design_scores_gemma":[0.000040164756,0.0015036911,0.76584953,0.0033480579,0.0017740992,0.0027846918,0.010589268,0.036192723,0.0529575,0.017790979,0.10698227,0.00018694393],"about_ca_topic_score_codex":0.0042938762,"about_ca_topic_score_gemma":0.01849857,"teacher_disagreement_score":0.0042938762,"about_ca_system_score_codex":0.0013677719,"about_ca_system_score_gemma":0.0006935929,"threshold_uncertainty_score":0.009923995},"labels":[],"label_agreement":null},{"id":"W4296272818","doi":"10.29173/mocs275","title":"Affordable wall panels using sustainable waste materials: a review","year":2022,"lang":"en","type":"review","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Carbon footprint; Modular design; Sustainability; Resource depletion; Population; Urbanization; Ecological footprint; Greenhouse gas; Engineering; Sustainable development; Business; Waste management; Economic growth; Computer science; Economics","score_opus":0.027773413603414267,"score_gpt":0.24862296377579834,"score_spread":0.22084955017238408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296272818","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0003215566,0.9972825,0.0001858395,0.00016366591,0.00014525437,0.00001505437,0.000030104562,0.0000053512863,0.0018506],"genre_scores_gemma":[0.0012459403,0.99796754,0.00026435294,0.00007707039,0.000057278503,0.000011073667,0.000026180704,0.0000017715552,0.000348798],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994161,0.000086586646,0.00010695777,0.00008642495,0.0002533926,0.000050528288],"domain_scores_gemma":[0.9990227,0.0005291342,0.00017397676,0.000021907847,0.00021645274,0.000035704023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008893539,0.0010357324,0.0012344756,0.004448815,0.000494603,0.002038563,0.0010689324,0.0014473047,0.004654158],"category_scores_gemma":[0.0012313237,0.000496245,0.001110781,0.0047988775,0.00046982354,0.0021370822,0.00090190774,0.00095361075,0.0012951567],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060286406,0.000171291,0.00037313337,0.13832612,0.00019052262,0.0004387065,0.00027625554,0.0008237975,0.0026281269,0.008609061,0.023870397,0.8242322],"study_design_scores_gemma":[0.000006078835,0.00012566682,0.0008188022,0.026797114,0.00029132995,0.0008773348,0.00021756082,0.0001603988,0.0014330356,0.0013863835,0.96785796,0.000028269225],"about_ca_topic_score_codex":0.0021852206,"about_ca_topic_score_gemma":0.003516691,"teacher_disagreement_score":0.004654158,"about_ca_system_score_codex":0.0006150376,"about_ca_system_score_gemma":0.0021796103,"threshold_uncertainty_score":0.0155697465},"labels":[],"label_agreement":null},{"id":"W4296450886","doi":"10.3390/su14159780","title":"Modeling and Performance Analysis for High-Rise Building Using ArchiCAD: Initiatives towards Energy-Efficient Building","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Ministry of Higher Education, Malaysia","keywords":"Retrofitting; Glazing; Energy consumption; Efficient energy use; Architectural engineering; Energy conservation; Cooling load; Audit; Building information modeling; Computer science; Environmental economics; Civil engineering; Engineering; Operations management; Mechanical engineering; Air conditioning; Business; Structural engineering; Scheduling (production processes)","score_opus":0.011366147113004462,"score_gpt":0.24910190588456194,"score_spread":0.23773575877155748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4296450886","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85353136,0.0006145067,0.10527393,0.0005132682,0.000069227266,0.00010579783,0.0011478488,0.00087919814,0.037864838],"genre_scores_gemma":[0.98449177,0.00031471957,0.011233424,0.000018005036,0.00000794494,0.000043024596,0.0003339859,0.000038371527,0.0035186517],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999824,0.000035414643,0.000010176429,0.000021120166,0.00008142506,0.000027953827],"domain_scores_gemma":[0.9998265,0.000066688335,0.00001945053,0.0000245071,0.000051674386,0.00001120414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035066967,0.0005433847,0.000516465,0.0004991079,0.0004961102,0.0011466771,0.00080021354,0.0009137749,0.0023314152],"category_scores_gemma":[0.0003544766,0.0003132429,0.0010781494,0.0005472054,0.00036080237,0.0004586461,0.0004888794,0.0006061407,0.0004315887],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035381854,0.00006750334,0.004041808,0.000078637364,0.000014216246,0.00010118348,0.000060701954,0.9844571,0.0043083066,0.001152724,0.00030389673,0.005378501],"study_design_scores_gemma":[0.0000049223822,0.00003948863,0.0015988762,0.000008900236,0.000010991017,0.000025621524,0.00004639693,0.9954556,0.0016244304,0.00019746141,0.0009776293,0.000009565457],"about_ca_topic_score_codex":0.017724216,"about_ca_topic_score_gemma":0.013568875,"teacher_disagreement_score":0.017724216,"about_ca_system_score_codex":0.00082590897,"about_ca_system_score_gemma":0.0007765923,"threshold_uncertainty_score":0.03524208},"labels":[],"label_agreement":null},{"id":"W4297154489","doi":"10.3390/app12199542","title":"BIM for Facilities Management: An Investigation into the Asset Information Delivery Process and the Associated Challenges","year":2022,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":47,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Fraser Health Authority","keywords":"Building information modeling; Asset (computer security); Process management; Process (computing); Context (archaeology); Business; Facility management; Asset management; Knowledge management; Risk analysis (engineering); Quality (philosophy); Computer science; Operations management; Engineering; Computer security; Marketing","score_opus":0.014898337113708731,"score_gpt":0.206171406099654,"score_spread":0.1912730689859453,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297154489","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72415704,0.002778834,0.16657946,0.010713497,0.00011025532,0.001346038,0.000286061,0.00025194336,0.093776904],"genre_scores_gemma":[0.94614154,0.0012475335,0.04990762,0.00022560729,0.000012417256,0.00027897465,0.00009653968,0.000040634786,0.0020491113],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9831381,0.0111524295,0.00062720757,0.0005507853,0.0035584862,0.00097298826],"domain_scores_gemma":[0.9731209,0.019937757,0.0018683561,0.0016005156,0.0029554148,0.0005169115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017547183,0.00047282875,0.00031050036,0.0033473186,0.0040418804,0.007915832,0.0016731039,0.0021681767,0.0026678538],"category_scores_gemma":[0.03786776,0.0006596699,0.0004961265,0.004920642,0.004127391,0.008478041,0.0049976134,0.0020392402,0.00042640863],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023876551,0.0007224266,0.05520637,0.0025213026,0.000056285902,0.0032657546,0.22599636,0.019839646,0.006334378,0.3220409,0.004992788,0.35878503],"study_design_scores_gemma":[0.00005987055,0.0008732261,0.0496669,0.0042848974,0.00012939206,0.0049531064,0.50540316,0.07353843,0.014204569,0.0910812,0.25549537,0.00030990664],"about_ca_topic_score_codex":0.0075809895,"about_ca_topic_score_gemma":0.009157345,"teacher_disagreement_score":0.017547183,"about_ca_system_score_codex":0.007862017,"about_ca_system_score_gemma":0.01176407,"threshold_uncertainty_score":0.092799425},"labels":[],"label_agreement":null},{"id":"W4297330760","doi":"10.1007/978-981-19-2145-2","title":"Recent Trends in Construction Technology and Management","year":2022,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Victoria","funders":"","keywords":"Computer science","score_opus":0.004641987600086576,"score_gpt":0.1856242688683406,"score_spread":0.18098228126825402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297330760","genre_codex":"review","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036672405,0.56224835,0.009155126,0.019170739,0.0047828373,0.00002674136,0.00015974324,0.00019246069,0.40059674],"genre_scores_gemma":[0.030724622,0.63446933,0.008879218,0.0040504425,0.0053255674,0.000059909005,0.0005633845,0.00015871921,0.31576884],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99916244,0.00013365742,0.000039007336,0.00007760007,0.00052069733,0.000066584325],"domain_scores_gemma":[0.9991819,0.0003705679,0.00006072429,0.000046624467,0.00024023085,0.00009982483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010079608,0.00072876783,0.0005853745,0.003390534,0.00070694165,0.004201793,0.0008062322,0.0013124669,0.029923977],"category_scores_gemma":[0.0014142994,0.00030475826,0.00031497082,0.013490939,0.0017013306,0.0044422727,0.0014091489,0.0016760838,0.008495041],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021716802,0.00006527638,0.00052969786,0.0010831675,0.00000872712,0.00007176786,0.00048933993,0.0006363428,0.00048986054,0.23543368,0.15700637,0.60416406],"study_design_scores_gemma":[0.0000022451648,0.0000135755545,0.0010265898,0.00024397545,0.0000045026086,0.0001345564,0.00025645844,0.00031177062,0.00007358822,0.018493537,0.9794333,0.0000059658687],"about_ca_topic_score_codex":0.003074015,"about_ca_topic_score_gemma":0.0083997855,"teacher_disagreement_score":0.029923977,"about_ca_system_score_codex":0.0024709313,"about_ca_system_score_gemma":0.0023854,"threshold_uncertainty_score":0.10010564},"labels":[],"label_agreement":null},{"id":"W4297825951","doi":"10.3390/buildings12081199","title":"Framework for BIM-Based Simulation of Construction Operations Implemented in a Game Engine","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Reuse; Computer science; Building information modeling; Interdependence; Task (project management); Systems engineering; Simulation modeling; Resource (disambiguation); Software engineering; Integration platform; Game engine; Simulation; Human–computer interaction; Engineering; Database","score_opus":0.014156980770158195,"score_gpt":0.2679132904491825,"score_spread":0.2537563096790243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4297825951","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029019942,0.000056047025,0.9854683,0.000102150385,0.000041151787,0.00042443737,0.00027165515,0.0035756738,0.0071585975],"genre_scores_gemma":[0.11712295,0.00028056148,0.8730578,0.00009351618,0.000021714553,0.0020232636,0.0010882011,0.0006480695,0.0056639696],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99900514,0.00032376312,0.00011863726,0.0001244074,0.0003274362,0.000100663856],"domain_scores_gemma":[0.9993432,0.00027062563,0.000040495688,0.00010634207,0.00016036087,0.00007894266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022081241,0.0013676259,0.0010402526,0.001606209,0.0009824656,0.0028415543,0.0039106123,0.0017603986,0.0112159],"category_scores_gemma":[0.0027222899,0.0009030711,0.0020043203,0.0006607673,0.0013187709,0.0014259862,0.0026808137,0.0018101989,0.001967816],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001609463,0.00029177498,0.0013062232,0.0003357658,0.00011216068,0.0005755107,0.00071405363,0.7327854,0.0067780255,0.2196215,0.00405936,0.03325924],"study_design_scores_gemma":[0.000059010854,0.00003322246,0.00013648736,0.00006278882,0.000025484862,0.00008728635,0.00005604427,0.9575432,0.0022196877,0.017686062,0.022059677,0.000030988358],"about_ca_topic_score_codex":0.014866896,"about_ca_topic_score_gemma":0.013675295,"teacher_disagreement_score":0.014866896,"about_ca_system_score_codex":0.0015803786,"about_ca_system_score_gemma":0.0029651185,"threshold_uncertainty_score":0.037520885},"labels":[],"label_agreement":null},{"id":"W4298284246","doi":"10.1007/978-3-642-20617-7_100256","title":"Life Cycle Cost Analysis","year":2014,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"","keywords":"Environmental science","score_opus":0.00784247285018043,"score_gpt":0.1870744570094033,"score_spread":0.17923198415922287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298284246","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011892401,0.0064508314,0.28611603,0.0009948793,0.000514259,0.00025134216,0.003936399,0.0005925645,0.68925124],"genre_scores_gemma":[0.27025414,0.011575711,0.11499544,0.00037617038,0.000249403,0.0005702536,0.008217497,0.0015927524,0.5921687],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99909604,0.00011937319,0.000023887664,0.000097097116,0.0005944554,0.000069152695],"domain_scores_gemma":[0.99952805,0.00012009912,0.000023503291,0.000056214703,0.0002623594,0.000009788943],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006644685,0.0013682462,0.00070042437,0.0038422388,0.00051469036,0.0017639366,0.0014491922,0.0006195729,0.042101976],"category_scores_gemma":[0.0018371878,0.0003681661,0.0010325226,0.0034894494,0.00027823224,0.0018940675,0.00056304946,0.0009427215,0.008614061],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004891909,0.000092078684,0.00076431234,0.00046197922,0.000060239887,0.000085722066,0.000092683586,0.13273284,0.0025900602,0.23742251,0.069572724,0.55607593],"study_design_scores_gemma":[0.000007964159,0.000097367854,0.0036326295,0.0005086767,0.000092293616,0.00026871057,0.00033606283,0.23598433,0.009896397,0.21535215,0.53373957,0.000083778155],"about_ca_topic_score_codex":0.009114106,"about_ca_topic_score_gemma":0.014384248,"teacher_disagreement_score":0.042101976,"about_ca_system_score_codex":0.0033426464,"about_ca_system_score_gemma":0.0016380169,"threshold_uncertainty_score":0.14084518},"labels":[],"label_agreement":null},{"id":"W4298286987","doi":"","title":"Environmental assessment of the reuse of marine sediments as fine aggregatesin cemented mortars","year":2015,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec en Abitibi-Témiscamingue","funders":"","keywords":"Mortar; Reuse; Environmental science; Geology; Geotechnical engineering; Engineering; Waste management; Oceanography","score_opus":0.009518395896857736,"score_gpt":0.21615090067404905,"score_spread":0.2066325047771913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298286987","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9981359,0.00009072265,0.00051091943,0.000012419968,0.0000026158923,0.00001015949,0.00010722474,0.0000065850886,0.0011233847],"genre_scores_gemma":[0.9984459,0.00013576349,0.0003575696,0.00000388502,0.000001205201,0.0000034552763,0.000057178328,0.0000054560746,0.0009895563],"study_design_codex":"bench_or_experimental","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966764,0.000052816857,0.000012293017,0.0000526521,0.00016763118,0.00004693182],"domain_scores_gemma":[0.99974936,0.000054408163,0.000042851712,0.000023033404,0.000107822314,0.000022457221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00043141103,0.00047901907,0.00030651852,0.00079984457,0.00043961013,0.0011077304,0.00037046496,0.0006172009,0.0010838474],"category_scores_gemma":[0.00040482404,0.0001460403,0.00046170002,0.0007086725,0.00039677278,0.00043561478,0.0004955173,0.0001934969,0.00018494391],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0030035684,0.0008600699,0.1926029,0.00036265986,0.00029983954,0.0012519304,0.00039299027,0.15578279,0.5806251,0.0012889673,0.0005316194,0.06299758],"study_design_scores_gemma":[0.00007219202,0.0037086993,0.43953782,0.000055675653,0.00045700534,0.00028614103,0.0010877788,0.09573289,0.45416936,0.0009970022,0.0038419594,0.000053486307],"about_ca_topic_score_codex":0.016225621,"about_ca_topic_score_gemma":0.027173623,"teacher_disagreement_score":0.016225621,"about_ca_system_score_codex":0.001424087,"about_ca_system_score_gemma":0.00055501424,"threshold_uncertainty_score":0.032262385},"labels":[],"label_agreement":null},{"id":"W4298326007","doi":"10.1016/j.autcon.2022.104596","title":"Spatial conflict simulator using game engine technology and Bayesian networks for workspace management","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Università Politecnica delle Marche; York University; New York University Abu Dhabi","keywords":"Workspace; Computer science; Simulation; Game engine; Bayesian network; Human–computer interaction; Artificial intelligence; Robot","score_opus":0.0065374399666457954,"score_gpt":0.21549301307792249,"score_spread":0.2089555731112767,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4298326007","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.109009385,0.0000406666,0.8793962,0.00018172692,0.0000775113,0.00027383113,0.0004031665,0.0016515699,0.008965931],"genre_scores_gemma":[0.7747238,0.000049983104,0.22077335,0.00006168571,0.000010118934,0.00047624332,0.0003120922,0.0001569313,0.003435805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999443,0.0002587452,0.000033808312,0.00007919139,0.00013398149,0.000051174928],"domain_scores_gemma":[0.9974721,0.001874727,0.00010021669,0.00015493411,0.00026184693,0.00013613088],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013413887,0.0006825377,0.0006801478,0.00074716663,0.0005107864,0.0010644367,0.0018989262,0.0011569847,0.0073460806],"category_scores_gemma":[0.0053209984,0.00056758075,0.00059697736,0.0005524418,0.00054519065,0.0013567124,0.0015962138,0.0011790751,0.0004730445],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019140476,0.00021366942,0.0011759228,0.00003665664,0.000045118202,0.00004958404,0.00011407858,0.9704716,0.0010235525,0.012861251,0.00058067,0.013236542],"study_design_scores_gemma":[0.000015792704,0.00001447318,0.000059020706,0.0000018950692,0.0000041285434,0.0000035715364,0.000008330039,0.9978709,0.00022864678,0.0016136956,0.0001761065,0.000003452206],"about_ca_topic_score_codex":0.017657775,"about_ca_topic_score_gemma":0.015439615,"teacher_disagreement_score":0.017657775,"about_ca_system_score_codex":0.0010791766,"about_ca_system_score_gemma":0.0017957413,"threshold_uncertainty_score":0.035109997},"labels":[],"label_agreement":null},{"id":"W4299330977","doi":"","title":"General Report of TC 307 – Sustainability in Geotechnical Engineering Rapport général du TC 307 -Développement durable en géotechnique","year":2017,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Sustainability; Geotechnical engineering; Geology","score_opus":0.009302613379655449,"score_gpt":0.22138276888171407,"score_spread":0.2120801555020586,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4299330977","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08507196,0.010342023,0.024058387,0.013197964,0.008090134,0.007909241,0.2595003,0.0032545286,0.5885755],"genre_scores_gemma":[0.15543513,0.008054482,0.028886696,0.0015909381,0.0017754087,0.0065447255,0.3148561,0.0029263406,0.47993016],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942259,0.000870767,0.0003841108,0.0004400798,0.0033996163,0.0006794708],"domain_scores_gemma":[0.98876756,0.0010738635,0.0005006805,0.0014079572,0.0069514094,0.0012985165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0071608117,0.0014115893,0.001175064,0.0047537787,0.0018304888,0.0028833011,0.0022110129,0.003085804,0.036006246],"category_scores_gemma":[0.0051545836,0.0005869539,0.0011691154,0.0038371577,0.00071873155,0.0015974385,0.0023326655,0.002476392,0.014397215],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018376817,0.0010091729,0.008129568,0.0019590072,0.0001543879,0.0009098551,0.0008171631,0.010337898,0.019516168,0.017001754,0.8375903,0.10073707],"study_design_scores_gemma":[0.00014953085,0.00037534698,0.021484531,0.0003957498,0.000049912847,0.0002323082,0.0005490634,0.0012996714,0.0110195065,0.0018584257,0.96253055,0.000055375403],"about_ca_topic_score_codex":0.1125808,"about_ca_topic_score_gemma":0.08798975,"teacher_disagreement_score":0.1125808,"about_ca_system_score_codex":0.0055313236,"about_ca_system_score_gemma":0.03802199,"threshold_uncertainty_score":0.22385103},"labels":[],"label_agreement":null},{"id":"W4300156632","doi":"10.1007/978-3-031-02202-9_4","title":"Collaborative Work Enabled by Surfaces","year":2013,"lang":"en","type":"book-chapter","venue":"Synthesis lectures on human-centered informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Work (physics); Computer science; Engineering; Mechanical engineering","score_opus":0.014559620536993502,"score_gpt":0.21563941052588798,"score_spread":0.20107978998889448,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300156632","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031240575,0.00520171,0.45262715,0.0014390117,0.00087573164,0.00008173637,0.00011888398,0.0020487285,0.5063665],"genre_scores_gemma":[0.64228845,0.0062027676,0.15076117,0.00022883562,0.00031831258,0.00038642625,0.0004952371,0.000710946,0.19860785],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99860615,0.00038924156,0.00004732563,0.000272262,0.0005141558,0.0001708186],"domain_scores_gemma":[0.99937767,0.00026352247,0.000025876838,0.00021275388,0.00006013889,0.000060105638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007647619,0.0011376761,0.00071736187,0.0010388052,0.0019117713,0.00603937,0.0015153439,0.0014579777,0.020219095],"category_scores_gemma":[0.0014858702,0.00059322506,0.0009773616,0.0014913717,0.003996803,0.0049459087,0.007920193,0.0014507531,0.004309807],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010617554,0.00004474625,0.00033026637,0.0003394605,0.00003728079,0.0003545311,0.008832757,0.011301957,0.011858951,0.7551526,0.014651617,0.19698969],"study_design_scores_gemma":[0.000037814112,0.00008955778,0.00093453965,0.00037352828,0.000035225123,0.00039514108,0.00424208,0.02282275,0.00925388,0.4060117,0.55574304,0.000060773065],"about_ca_topic_score_codex":0.0012894179,"about_ca_topic_score_gemma":0.0009327182,"teacher_disagreement_score":0.020219095,"about_ca_system_score_codex":0.0009055764,"about_ca_system_score_gemma":0.00084227027,"threshold_uncertainty_score":0.06763959},"labels":[],"label_agreement":null},{"id":"W4300962180","doi":"10.3389/fbuil.2022.980023","title":"Pull planning versus push planning: Investigating impacts on crew performance from a location-based perspective","year":2022,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; American University of Beirut","keywords":"Crew; Control (management); Productivity; Operations research; Computer science; Task (project management); Operations management; Engineering; Systems engineering; Aeronautics","score_opus":0.017068945532638307,"score_gpt":0.21938258641233394,"score_spread":0.20231364087969564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4300962180","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97196406,0.00012055425,0.019794565,0.000096112584,0.000010766435,0.00009547874,0.00011514123,0.00010254556,0.0077007366],"genre_scores_gemma":[0.99456114,0.00007325045,0.0046467665,0.000011220943,0.000002363221,0.000055245215,0.00006127721,0.000019977833,0.00056878966],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9985191,0.00065588317,0.000054513224,0.00015112958,0.00041722527,0.00020216819],"domain_scores_gemma":[0.9930674,0.005097205,0.0006146395,0.00038475866,0.00049858965,0.00033741526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002140289,0.00057590957,0.00035628385,0.0008147086,0.00037235522,0.0016845568,0.0005178928,0.00062633323,0.0023200205],"category_scores_gemma":[0.0076941834,0.00027060555,0.00042034616,0.00094577094,0.00054770685,0.0014062907,0.0009641016,0.0005985387,0.0003402154],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0033511037,0.0021163886,0.14661375,0.0011072266,0.00059416326,0.0005823395,0.0036996976,0.56038445,0.051316876,0.0067900927,0.0009365079,0.22250734],"study_design_scores_gemma":[0.0002522237,0.0125253815,0.28114924,0.00023197188,0.0005149064,0.00028381296,0.013303588,0.64095545,0.03739822,0.0073595373,0.0057945647,0.00023117418],"about_ca_topic_score_codex":0.0045671477,"about_ca_topic_score_gemma":0.004371326,"teacher_disagreement_score":0.0045671477,"about_ca_system_score_codex":0.00059300155,"about_ca_system_score_gemma":0.00087664265,"threshold_uncertainty_score":0.011319041},"labels":[],"label_agreement":null},{"id":"W4301423541","doi":"10.47893/ijatce.2012.1033","title":"EVALUATION OF DESIGN-BID-BUILD (D-B-B) PROJECTS WITH AND WITHOUT AGENCY CONSTRUCTION MANAGEMENT","year":2012,"lang":"en","type":"article","venue":"International Journal of Advanced Technology in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Integrated project delivery; Agency (philosophy); Schedule; Business; Pre-construction services; Construction management; Project management; Operations management; Design–build; Earned value management; Basis of estimate; Project charter; Project planning; Process management; Engineering; Computer science; Systems engineering; Civil engineering","score_opus":0.011855244730314688,"score_gpt":0.24917213533047397,"score_spread":0.23731689060015929,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4301423541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93759334,0.0087345885,0.006126801,0.0006587025,0.00009457753,0.006421022,0.0009666146,0.00007853969,0.039325867],"genre_scores_gemma":[0.9756152,0.0050762864,0.012508247,0.0001380485,0.000028907412,0.0032506485,0.00083292817,0.000022310942,0.0025273403],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9636209,0.01661732,0.003574784,0.0011185671,0.013756368,0.0013120103],"domain_scores_gemma":[0.9171947,0.029548196,0.009336858,0.0020943568,0.03940683,0.0024190948],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.038986612,0.0006077613,0.0011314615,0.00700042,0.0011395589,0.0030834386,0.0011932321,0.00062302157,0.0020626779],"category_scores_gemma":[0.06328213,0.000598007,0.001160077,0.007616718,0.0008126372,0.0027107412,0.0017289328,0.0006279381,0.00045641203],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0039303987,0.005617293,0.14093566,0.035687596,0.0010402896,0.0017316653,0.031273834,0.0073114056,0.0088012535,0.009174279,0.009861422,0.74463487],"study_design_scores_gemma":[0.0011127735,0.040640052,0.6523067,0.017606879,0.002846202,0.0013773905,0.11117717,0.007417217,0.019542146,0.0028268173,0.14266221,0.0004844848],"about_ca_topic_score_codex":0.006578812,"about_ca_topic_score_gemma":0.012595423,"teacher_disagreement_score":0.038986612,"about_ca_system_score_codex":0.008013844,"about_ca_system_score_gemma":0.011844557,"threshold_uncertainty_score":0.20618337},"labels":[],"label_agreement":null},{"id":"W4303684799","doi":"10.1016/j.rineng.2022.100690","title":"Digital mock-ups as support tools for preventing risks related to energy sources in the operation stage of industrial facilities through design","year":2022,"lang":"en","type":"article","venue":"Results in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Automation; Hazardous waste; Risk analysis (engineering); Product (mathematics); Systems engineering; Engineering; Computer science; Control (management); Software; Manufacturing engineering; Software engineering","score_opus":0.04682662701859045,"score_gpt":0.248593663783606,"score_spread":0.20176703676501556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4303684799","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.082088,0.0014216821,0.8727934,0.0003533072,0.00012552828,0.0009325673,0.0005695122,0.0045024073,0.037213616],"genre_scores_gemma":[0.2568046,0.0008073087,0.73216975,0.00010818722,0.000016400758,0.000562328,0.0009439403,0.0004259865,0.008161519],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.992218,0.0036087444,0.00062163896,0.0005936684,0.0027403892,0.00021754797],"domain_scores_gemma":[0.9884533,0.004961231,0.0009257589,0.0040178206,0.0014107121,0.00023111945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057320804,0.0011773973,0.00046224962,0.003662433,0.0009168722,0.0035788533,0.0022369917,0.0013484792,0.0051997197],"category_scores_gemma":[0.0153810335,0.00085061113,0.0011288901,0.001213656,0.0023323905,0.0035022302,0.0029241615,0.000887344,0.0012353554],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038540657,0.00039203255,0.010606609,0.00338482,0.00013481005,0.0014478152,0.014932856,0.07131441,0.045298066,0.28956363,0.008321107,0.5542184],"study_design_scores_gemma":[0.0001556642,0.0010872015,0.01646031,0.003021213,0.00042735803,0.0038340199,0.0066833403,0.1232906,0.11720787,0.08859724,0.63874114,0.0004939742],"about_ca_topic_score_codex":0.0013501266,"about_ca_topic_score_gemma":0.0016527993,"teacher_disagreement_score":0.0057320804,"about_ca_system_score_codex":0.0016064766,"about_ca_system_score_gemma":0.0020357904,"threshold_uncertainty_score":0.030314445},"labels":[],"label_agreement":null},{"id":"W4307850757","doi":"10.1139/cjce-2022-0041","title":"Assessing the assessor: a framework for BIM maturity, capacity, and competency evaluation at the organizational level","year":2022,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Relevance (law); Building information modeling; Computer science; Process management; Software deployment; Maturity (psychological); Capability Maturity Model; Knowledge management; Management science; Engineering; Software engineering; Operations management; Software; Psychology","score_opus":0.029657031612407972,"score_gpt":0.24098432886138724,"score_spread":0.21132729724897925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4307850757","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008691337,0.00250352,0.9492217,0.0066590956,0.00014729702,0.005349986,0.00036211917,0.00045414743,0.026610838],"genre_scores_gemma":[0.08237443,0.00075490907,0.90930474,0.0005808174,0.0000369368,0.0056591355,0.00023795906,0.00007479764,0.00097625656],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.7634988,0.19000137,0.01364594,0.0078094434,0.022715444,0.0023289924],"domain_scores_gemma":[0.85177284,0.089028224,0.011230348,0.009976122,0.03491492,0.0030775745],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.20835647,0.003211075,0.0024979701,0.024041556,0.0054342574,0.012823042,0.004901362,0.0045418516,0.0034958988],"category_scores_gemma":[0.17791456,0.0014030882,0.0028610972,0.010332331,0.014073952,0.015365118,0.010320965,0.0052033197,0.0012544666],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019448795,0.00050885504,0.01675734,0.0035948174,0.00037269678,0.00031736254,0.041852348,0.004623234,0.0020727823,0.5497942,0.006690809,0.373221],"study_design_scores_gemma":[0.00032005878,0.0014814152,0.016739544,0.013685334,0.0009457848,0.0008865151,0.038221464,0.05228945,0.0057700723,0.6819985,0.18709622,0.00056571065],"about_ca_topic_score_codex":0.011158679,"about_ca_topic_score_gemma":0.013273457,"teacher_disagreement_score":0.20835647,"about_ca_system_score_codex":0.0164149,"about_ca_system_score_gemma":0.028045319,"threshold_uncertainty_score":0.9762374},"labels":[],"label_agreement":null},{"id":"W4308565161","doi":"10.1061/(asce)co.1943-7862.0002393","title":"Optimizing Modularity of Prefabricated Residential Plumbing Systems for Construction in Remote Communities","year":2022,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval","funders":"","keywords":"Prefabrication; Modular programming; Modularity (biology); Computer science; Sorting; Context (archaeology); Multi-objective optimization; Piping; Systems engineering; Civil engineering; Engineering; Mechanical engineering; Algorithm","score_opus":0.009266445138573484,"score_gpt":0.1945422077129463,"score_spread":0.18527576257437284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4308565161","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7886862,0.00014225038,0.20329556,0.00009217034,0.000010242017,0.00017093131,0.00010105724,0.00018710966,0.007314337],"genre_scores_gemma":[0.95988876,0.00005193121,0.038498364,0.000007400285,0.0000013308455,0.000053426964,0.000060967115,0.000019374782,0.001418304],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999741,0.000058804304,0.000007992881,0.00004995666,0.00005570066,0.00008651384],"domain_scores_gemma":[0.999703,0.00009139444,0.00006644732,0.000023558618,0.00006901314,0.000046502555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000667092,0.0007742801,0.0004318383,0.0007485478,0.0006619599,0.00074316695,0.00077920343,0.00056329026,0.0019167656],"category_scores_gemma":[0.00094028283,0.00037228758,0.0004651532,0.00055611826,0.00042846057,0.0005322798,0.0007387756,0.00039476747,0.00017646022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043315693,0.00004729793,0.0024962153,0.00004651134,0.000011575347,0.000080442376,0.000047036767,0.9743542,0.007375566,0.0011346618,0.000103048806,0.014260105],"study_design_scores_gemma":[0.000013923309,0.00017275671,0.004588032,0.000011130131,0.000018919236,0.000037542955,0.00016613028,0.9900455,0.0030396748,0.0013690479,0.0005267358,0.00001059573],"about_ca_topic_score_codex":0.033385452,"about_ca_topic_score_gemma":0.06963975,"teacher_disagreement_score":0.033385452,"about_ca_system_score_codex":0.0023523509,"about_ca_system_score_gemma":0.002041314,"threshold_uncertainty_score":0.06638229},"labels":[],"label_agreement":null},{"id":"W4309582883","doi":"10.1007/978-3-031-20241-4_19","title":"Integrating Smart and Sustainable Construction: A Review of Present Status, and Possible Opportunities","year":2022,"lang":"en","type":"review","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Sustainability; Architectural engineering; Engineering; Risk analysis (engineering); Work (physics); Construction engineering; Environmental economics; Business","score_opus":0.022220260571815597,"score_gpt":0.24720293076119987,"score_spread":0.22498267018938428,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309582883","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00006210781,0.9991565,0.00006500072,0.00021282956,0.000103844905,0.0000024693695,0.00001093939,0.000002023686,0.00038429652],"genre_scores_gemma":[0.00039404607,0.9990459,0.00017342898,0.00017286441,0.00008646457,0.0000030175818,0.000014276351,8.4897863e-7,0.000109125234],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99932086,0.00010270248,0.00013446111,0.00011344172,0.00027653747,0.000052063762],"domain_scores_gemma":[0.9976955,0.0012463814,0.00029493577,0.000044892007,0.00059661473,0.00012171903],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023695761,0.0009300417,0.001876398,0.0038110223,0.00035912293,0.0022681,0.0011850327,0.0015927796,0.0032735409],"category_scores_gemma":[0.0025500318,0.00063389464,0.0006110677,0.0063583055,0.0008797512,0.0036649045,0.001259522,0.0015302977,0.0012144332],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007956165,0.00009110026,0.00034665718,0.04986323,0.00011264366,0.0000876574,0.000109413966,0.0004445382,0.00093463424,0.0068272827,0.019892767,0.9212106],"study_design_scores_gemma":[0.000017383254,0.00013378309,0.0015343889,0.020162547,0.00025397816,0.0005179015,0.0002941282,0.00015638667,0.00042996797,0.0030161915,0.9734442,0.000038936476],"about_ca_topic_score_codex":0.0026411642,"about_ca_topic_score_gemma":0.0076449476,"teacher_disagreement_score":0.0038110223,"about_ca_system_score_codex":0.001136163,"about_ca_system_score_gemma":0.0033079232,"threshold_uncertainty_score":0.012531698},"labels":[],"label_agreement":null},{"id":"W4309781265","doi":"10.1016/j.autcon.2022.104631","title":"Systematic search and mapping review of the concrete delivery problem (CDP): Formulations, objectives, and data","year":2022,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"Mitacs","keywords":"Computer science; Engineering; Information retrieval; Construction engineering; Data mining","score_opus":0.01617566056795186,"score_gpt":0.2368264143361466,"score_spread":0.22065075376819474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4309781265","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007187627,0.9731039,0.004841034,0.0014694149,0.00023641584,0.005262011,0.006103845,0.00006896266,0.0017267076],"genre_scores_gemma":[0.10082706,0.85769767,0.020794649,0.002223448,0.00014624305,0.012796803,0.004725881,0.00006195717,0.00072631415],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9478235,0.02130226,0.020767998,0.0031901405,0.006244506,0.00067155],"domain_scores_gemma":[0.842156,0.12626491,0.017030114,0.0041100704,0.009392186,0.0010467927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03697263,0.0024780498,0.012053638,0.039611075,0.0016769073,0.004698299,0.004440672,0.0033856828,0.008210144],"category_scores_gemma":[0.18140885,0.0016442913,0.008898073,0.030220868,0.0022962452,0.004520833,0.0050026337,0.0022894659,0.0007471649],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019283108,0.000035738194,0.0008553238,0.9555324,0.00887871,0.00014151348,0.00063957565,0.0003312133,0.0001889496,0.0009909878,0.0018251041,0.030387616],"study_design_scores_gemma":[0.00037096225,0.00029244923,0.0035060844,0.91115236,0.05755554,0.0003181262,0.0012395943,0.00024779118,0.00030692687,0.0017134311,0.023224922,0.000071884],"about_ca_topic_score_codex":0.018305609,"about_ca_topic_score_gemma":0.053373788,"teacher_disagreement_score":0.039611075,"about_ca_system_score_codex":0.008585108,"about_ca_system_score_gemma":0.046945177,"threshold_uncertainty_score":0.19553226},"labels":[],"label_agreement":null},{"id":"W4310191174","doi":"10.20944/preprints202211.0517.v1","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Software deployment; Bridge (graph theory); Productivity; Process (computing); Engineering; Plan (archaeology); Emerging technologies; Computer science; Engineering management; Knowledge management; Data science; Artificial intelligence; Software engineering","score_opus":0.11622924426170288,"score_gpt":0.3239801327102164,"score_spread":0.20775088844851353,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310191174","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6776287,0.0039056335,0.038007118,0.0118985325,0.00005645973,0.00010128287,0.000030358156,0.00017458704,0.26819736],"genre_scores_gemma":[0.99279505,0.000680024,0.0052714297,0.00012648763,0.000013565542,0.000013141581,0.000009220306,0.000011444944,0.0010796216],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9921401,0.0032467865,0.00039028877,0.00067251147,0.0027058441,0.00084449473],"domain_scores_gemma":[0.9881259,0.006635997,0.0018774692,0.0011533112,0.0016493651,0.00055795285],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007009031,0.0003030323,0.00021635459,0.0017912774,0.0012260355,0.0070675416,0.000791613,0.0013087378,0.0019693174],"category_scores_gemma":[0.013401145,0.00025791713,0.0002977753,0.0026188828,0.0033773058,0.0045239413,0.0025407341,0.0011064479,0.00046649083],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021421227,0.00050327193,0.075812615,0.0011148583,0.000082505736,0.00093668886,0.034803465,0.008821144,0.00996619,0.23116362,0.0031367175,0.6334447],"study_design_scores_gemma":[0.0001349203,0.0011077769,0.3123467,0.0025011299,0.00021091281,0.0016298281,0.08446791,0.027958458,0.0170689,0.26422793,0.28814945,0.00019609505],"about_ca_topic_score_codex":0.0024110728,"about_ca_topic_score_gemma":0.0037406534,"teacher_disagreement_score":0.0070675416,"about_ca_system_score_codex":0.0048449454,"about_ca_system_score_gemma":0.006089975,"threshold_uncertainty_score":0.03706771},"labels":[],"label_agreement":null},{"id":"W4310517097","doi":"10.1016/j.tws.2022.110364","title":"Experimental and numerical investigation of a novel vertically unconstrained steel inter-modular connection","year":2022,"lang":"en","type":"article","venue":"Thin-Walled Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":51,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Modular design; Structural engineering; Connection (principal bundle); Finite element method; Serviceability (structure); Engineering; Slip (aerodynamics); Computer science","score_opus":0.011135867796206428,"score_gpt":0.21660689132290523,"score_spread":0.2054710235266988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310517097","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9758514,0.00004984992,0.017653834,0.000036121648,0.000059114245,0.000046044457,0.00016421516,0.0002554599,0.005884031],"genre_scores_gemma":[0.9867237,0.000023704366,0.011166433,0.0000075011326,0.0000030013903,0.00002854252,0.000088819135,0.00001871832,0.0019394928],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996531,0.000031137548,0.000009892412,0.000074555326,0.000186087,0.000045174962],"domain_scores_gemma":[0.9994966,0.00007445761,0.00010163851,0.00014090333,0.00011048149,0.00007601273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035049822,0.00040825672,0.00028172394,0.00027201299,0.00041962313,0.0003441051,0.00088142185,0.0007075948,0.0044098054],"category_scores_gemma":[0.0009355258,0.0003351136,0.00017416378,0.0003151333,0.00064863404,0.0005081604,0.00053811615,0.00042217172,0.00065839925],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005150814,0.0004548717,0.0029064822,0.00019578272,0.000028715347,0.00066203455,0.00027134316,0.046693586,0.92629695,0.00655841,0.00093407254,0.014482571],"study_design_scores_gemma":[0.0001739346,0.004078255,0.027874993,0.00006411983,0.00010110358,0.00076408416,0.00037515705,0.31604058,0.6373776,0.0013406228,0.01173146,0.0000780766],"about_ca_topic_score_codex":0.00041877915,"about_ca_topic_score_gemma":0.00084868376,"teacher_disagreement_score":0.0044098054,"about_ca_system_score_codex":0.00021762408,"about_ca_system_score_gemma":0.0004800281,"threshold_uncertainty_score":0.014752328},"labels":[],"label_agreement":null},{"id":"W4310806108","doi":"10.18280/rcma.320505","title":"Study the Ideal Proportions of Matrix, Reinforcing Materials and Additives to Obtain a Composite Material with High Tensile Strength","year":2022,"lang":"en","type":"article","venue":"Revue des composites et des matériaux avancés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sawdust; Materials science; Ultimate tensile strength; Composite material; Composite number; Polyester; Matrix (chemical analysis); Glass fiber; Polyester resin; Mass fraction; Unsaturated polyester; Chemistry","score_opus":0.020037874408624944,"score_gpt":0.24370261477941552,"score_spread":0.22366474037079057,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310806108","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8626058,0.002120285,0.12890898,0.000108203865,0.00006539317,0.00025252643,0.00024704344,0.00021772439,0.00547397],"genre_scores_gemma":[0.87699455,0.00077762967,0.12043796,0.00004797057,0.000024287128,0.0002844048,0.00021768051,0.00008705961,0.0011284256],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985551,0.00040490757,0.00012440758,0.00034207455,0.0004900999,0.00008347162],"domain_scores_gemma":[0.99791914,0.001138341,0.00035526574,0.00013379125,0.00038686141,0.0000666599],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022602032,0.0005453476,0.00042045073,0.0009244375,0.00030526918,0.00048403037,0.0003324708,0.00046258242,0.0014817083],"category_scores_gemma":[0.004383949,0.00028358714,0.00024861854,0.0004384063,0.0003718717,0.00079937675,0.0002260239,0.00030884764,0.00064491126],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042193424,0.00032544008,0.010440848,0.0005562981,0.000040845433,0.00008706035,0.00010107492,0.00513246,0.9415418,0.0019381528,0.00014807867,0.03926603],"study_design_scores_gemma":[0.000026971202,0.0015084767,0.008602799,0.000048957823,0.00010363581,0.00020415637,0.00015634845,0.010134149,0.97248095,0.0007377705,0.0059736427,0.000022103668],"about_ca_topic_score_codex":0.00021881505,"about_ca_topic_score_gemma":0.0005699432,"teacher_disagreement_score":0.0022602032,"about_ca_system_score_codex":0.00020122336,"about_ca_system_score_gemma":0.0004883329,"threshold_uncertainty_score":0.011953294},"labels":[],"label_agreement":null},{"id":"W4310837982","doi":"10.1088/1755-1315/1101/1/011011","title":"Preface: CIB World Building Congress 2022","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Chemical Institute of Canada","funders":"","keywords":"Political science; Engineering; Library science; Public administration; Computer science","score_opus":0.0077308446427350516,"score_gpt":0.1863366629867707,"score_spread":0.17860581834403566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4310837982","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013181022,0.017942041,0.0019695316,0.04455866,0.2689786,0.0013925686,0.0242955,0.0018004556,0.6377445],"genre_scores_gemma":[0.004154264,0.006094615,0.0010504392,0.007892119,0.028738622,0.0010157924,0.015199834,0.0009966687,0.9348576],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971831,0.00023966913,0.00016630598,0.0002539673,0.0017120966,0.00044491148],"domain_scores_gemma":[0.9936752,0.0003875782,0.00026979783,0.00034110993,0.004037283,0.0012889977],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039283745,0.0015892999,0.00094390876,0.0050323633,0.0039684097,0.012138916,0.0017599529,0.004793647,0.29343995],"category_scores_gemma":[0.007005464,0.0006700484,0.0010007999,0.0048555345,0.00061967474,0.004125069,0.0036872467,0.0054942803,0.2644709],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011450938,0.000008060929,0.000039390707,0.000062607556,8.6078245e-7,0.000010854213,0.00001304288,0.000032071395,0.00005921615,0.00083919865,0.991546,0.0073772827],"study_design_scores_gemma":[0.0000015554552,0.0000030732144,0.0002892243,0.000050573086,6.1599667e-7,0.0000075202734,0.000023228225,0.00001063277,0.000029633007,0.00015339551,0.99942684,0.0000037246912],"about_ca_topic_score_codex":0.012697869,"about_ca_topic_score_gemma":0.012834039,"teacher_disagreement_score":0.29343995,"about_ca_system_score_codex":0.0035888797,"about_ca_system_score_gemma":0.0072193304,"threshold_uncertainty_score":0.98165447},"labels":[],"label_agreement":null},{"id":"W4311168223","doi":"10.1088/1755-1315/1101/5/052015","title":"Sources of challenges for sustainability in the building design – The relationship between designers and clients","year":2022,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Sustainability; Building information modeling; Scope (computer science); Process management; Business; Knowledge management; Design management; Sustainable design; Building design; Engineering; Architectural engineering; Computer science; Information management; Operations management","score_opus":0.037791763847122545,"score_gpt":0.22886447777208496,"score_spread":0.19107271392496242,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4311168223","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85054445,0.0028613638,0.011500832,0.063854374,0.00020216084,0.00016830646,0.000104059705,0.00010232475,0.07066203],"genre_scores_gemma":[0.99281454,0.00047536843,0.0011689067,0.0011464739,0.000021587222,0.0000741455,0.00002005778,0.000021310325,0.004257615],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9498539,0.034604948,0.001981984,0.0023690201,0.008004057,0.0031860536],"domain_scores_gemma":[0.9433597,0.03565527,0.0048129368,0.0027578918,0.008660713,0.004753545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02385025,0.00043219246,0.00073150056,0.0021851084,0.012522872,0.01808217,0.0024863784,0.005350121,0.011421154],"category_scores_gemma":[0.0450658,0.0008644208,0.0004997051,0.0025078622,0.007958316,0.0075766174,0.0131274965,0.005003692,0.0016166569],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009365583,0.000255574,0.06486177,0.0006170601,0.000050015362,0.0050895764,0.8152061,0.00060235045,0.0019436103,0.039866023,0.0092917215,0.062122587],"study_design_scores_gemma":[0.000007115578,0.000041797844,0.006045813,0.00050129485,0.000016294493,0.0013628765,0.9312244,0.0006315302,0.0005902735,0.009739018,0.049786992,0.000052625463],"about_ca_topic_score_codex":0.005143679,"about_ca_topic_score_gemma":0.0036898279,"teacher_disagreement_score":0.02385025,"about_ca_system_score_codex":0.010327119,"about_ca_system_score_gemma":0.011396443,"threshold_uncertainty_score":0.12613368},"labels":[],"label_agreement":null},{"id":"W4312125615","doi":"10.3390/buildings12122185","title":"Case-Study: Fully Prefabricated Wood Wall Connection to Improve Building Envelope and On-Site Efficiency","year":2022,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"Natural Sciences and Engineering Research Council of Canada; Ministère des Forêts, de la Faune et des Parcs","keywords":"Modular design; Joint (building); Engineering; Building envelope; Doors; Prefabrication; Elevator; Seal (emblem); Expansion joint; Structural engineering; Envelope (radar); Bridge (graph theory); Computer science; Thermal","score_opus":0.009013237547611304,"score_gpt":0.21319013644168183,"score_spread":0.20417689889407054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312125615","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9527267,0.00019678434,0.031017097,0.00013581869,0.000035270692,0.00030923673,0.00022013238,0.00021159508,0.015147307],"genre_scores_gemma":[0.9619499,0.00012363723,0.030928062,0.000026076248,0.000007063066,0.00009006671,0.00013845392,0.000062895655,0.006673871],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9989672,0.00024046823,0.00005941531,0.00013351857,0.00041283798,0.000186501],"domain_scores_gemma":[0.9992536,0.00022600536,0.00007857409,0.00018549358,0.00013149012,0.00012476536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085758447,0.0004864049,0.00033030353,0.0004441134,0.00073939783,0.0008507184,0.0010823007,0.001597373,0.004099215],"category_scores_gemma":[0.0014776693,0.00023010313,0.00047766618,0.00057184766,0.0005887053,0.00095561164,0.0008571146,0.00062182057,0.0010203113],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022411114,0.0049598194,0.11243291,0.0023237052,0.00018051124,0.11273288,0.009655201,0.133876,0.23829536,0.02991114,0.011512393,0.34187904],"study_design_scores_gemma":[0.00032514846,0.0085395835,0.14031824,0.00059981196,0.00031357422,0.09165298,0.017555114,0.14421308,0.4210384,0.009275529,0.16578366,0.0003849459],"about_ca_topic_score_codex":0.0012811011,"about_ca_topic_score_gemma":0.0029769454,"teacher_disagreement_score":0.004099215,"about_ca_system_score_codex":0.00038224235,"about_ca_system_score_gemma":0.00056518306,"threshold_uncertainty_score":0.013713241},"labels":[],"label_agreement":null},{"id":"W4312787304","doi":"10.4236/ojce.2022.124028","title":"Integrating Universal Design Standards and Building Information Modeling at the Conceptual Design Stage of Buildings","year":2022,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Conceptual design; Process (computing); Systems engineering; Information model; Engineering; Conceptual model; Architecture; Novelty; Engineering design process; Plug-in; Population; Computer science; Software engineering; Construction engineering; Database; Human–computer interaction; Operations management","score_opus":0.01586291960788792,"score_gpt":0.21999081791928204,"score_spread":0.20412789831139413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4312787304","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015298881,0.00035168082,0.96608645,0.00047476645,0.00004307879,0.00037543723,0.00049092475,0.0018964965,0.014982335],"genre_scores_gemma":[0.12915751,0.00056916807,0.86614513,0.0000651128,0.000013396773,0.00033481754,0.0012903097,0.00019548088,0.0022289846],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9925891,0.0021468208,0.000860259,0.0008461905,0.0032535978,0.00030404053],"domain_scores_gemma":[0.99432397,0.0015351813,0.0004396666,0.001999431,0.0015858631,0.000115969626],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00533617,0.0007315072,0.0006085876,0.003665815,0.0010824235,0.0066400967,0.0020900758,0.00084131333,0.0020565365],"category_scores_gemma":[0.010872385,0.0007551389,0.0010783133,0.0037673838,0.0017335272,0.0053573446,0.0034429007,0.0010901152,0.00071480346],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009388663,0.00023743317,0.010586278,0.00076156127,0.000086409884,0.00026108138,0.004556709,0.09948398,0.0074352366,0.38923422,0.005897095,0.48136616],"study_design_scores_gemma":[0.00003125193,0.00018986002,0.009754068,0.0008274938,0.00018387112,0.0006653159,0.0029256067,0.432326,0.028084986,0.1720527,0.3527565,0.0002024456],"about_ca_topic_score_codex":0.019202985,"about_ca_topic_score_gemma":0.024606138,"teacher_disagreement_score":0.019202985,"about_ca_system_score_codex":0.0030466253,"about_ca_system_score_gemma":0.0063052545,"threshold_uncertainty_score":0.038182378},"labels":[],"label_agreement":null},{"id":"W4313072567","doi":"10.1051/shsconf/202214701002","title":"Les environnements communs de données (CDE) : définitions, historique et classification","year":2022,"lang":"fr","type":"article","venue":"SHS Web of Conferences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Humanities; Political science; Philosophy","score_opus":0.056519712301231456,"score_gpt":0.2591617229863039,"score_spread":0.20264201068507245,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313072567","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041297816,0.13542452,0.7281505,0.00965446,0.0019260071,0.00053684576,0.004766843,0.0012805532,0.07696249],"genre_scores_gemma":[0.32987684,0.14437084,0.46574947,0.0021374838,0.0030148197,0.0013957006,0.009938281,0.0010101161,0.042506553],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9886142,0.0025919073,0.0016617615,0.0022342985,0.004397846,0.0004999964],"domain_scores_gemma":[0.9861268,0.006371176,0.0014992525,0.0020858657,0.003592314,0.0003245303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008238954,0.0013200534,0.0011470087,0.013104771,0.0021616993,0.010988202,0.0017502517,0.002683321,0.0030713053],"category_scores_gemma":[0.013452763,0.00089925196,0.0014388743,0.024379488,0.0071549998,0.011940964,0.0038922948,0.004326584,0.0011691805],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008625768,0.000073618095,0.0084759295,0.0016828649,0.00008618408,0.00044466715,0.0060863625,0.0057737925,0.0026741498,0.5604439,0.008014729,0.40615758],"study_design_scores_gemma":[0.000013102298,0.000060698465,0.007651011,0.0018723268,0.00007245945,0.00201547,0.0035795073,0.010944099,0.004012295,0.11768021,0.85192674,0.00017214248],"about_ca_topic_score_codex":0.018923936,"about_ca_topic_score_gemma":0.0068290047,"teacher_disagreement_score":0.018923936,"about_ca_system_score_codex":0.004667991,"about_ca_system_score_gemma":0.0048474288,"threshold_uncertainty_score":0.043572307},"labels":[],"label_agreement":null},{"id":"W4313170065","doi":"10.2139/ssrn.4234625","title":"An Integrated Framework for Vr-Based Collaborative Design Support System for Consensus-Building in Built Environment Design","year":2022,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Collaborative design; Computer science; Systems engineering; Human–computer interaction; Engineering; Systems design","score_opus":0.013973172728593747,"score_gpt":0.24250396683070005,"score_spread":0.2285307941021063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313170065","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00268447,0.00008763537,0.98207563,0.00006310099,0.000029673436,0.00020186462,0.00017149339,0.011440626,0.003245597],"genre_scores_gemma":[0.110717855,0.00024050199,0.8791961,0.00009822657,0.00002308701,0.00066894956,0.0017136176,0.0011198887,0.0062217284],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99844486,0.00038961763,0.00015411418,0.00026033603,0.00059022644,0.00016078458],"domain_scores_gemma":[0.9992482,0.00019778866,0.00004207539,0.00020309213,0.00020501166,0.0001037974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018869863,0.0010970483,0.0009884434,0.0014814121,0.0007457781,0.0032191498,0.003377288,0.0017680941,0.0106974915],"category_scores_gemma":[0.0025901343,0.00060379884,0.0013973542,0.00087532675,0.0006374515,0.0021316826,0.0038199646,0.0013062746,0.003249165],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00062428985,0.0008425763,0.002247196,0.0011048472,0.0003033923,0.0012893379,0.0042106523,0.16415448,0.06420131,0.12251342,0.024777293,0.6137312],"study_design_scores_gemma":[0.0001685218,0.00024374759,0.0009936857,0.0002024979,0.00017050665,0.00049146113,0.00055271294,0.8048077,0.025254697,0.034379926,0.13255909,0.00017550806],"about_ca_topic_score_codex":0.0065294276,"about_ca_topic_score_gemma":0.005457328,"teacher_disagreement_score":0.0106974915,"about_ca_system_score_codex":0.0007488646,"about_ca_system_score_gemma":0.0017607664,"threshold_uncertainty_score":0.03578663},"labels":[],"label_agreement":null},{"id":"W4313201678","doi":"10.1016/j.cscm.2022.e01755","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2022,"lang":"en","type":"article","venue":"Case Studies in Construction Materials","topic":"BIM and Construction Integration","field":"Engineering","cited_by":96,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Abbott (Canada)","funders":"King Khalid University; Najran University; Deanship of Scientific Research, King Faisal University","keywords":"Building information modeling; Energy consumption; Sustainability; Environmental economics; Energy management; Energy modeling; Consumption (sociology); Efficient energy use; Engineering; Green building; Civil engineering; Energy (signal processing); Architectural engineering; Environmental resource management; Operations management; Environmental science; Economics","score_opus":0.02881465003547695,"score_gpt":0.2713294658113661,"score_spread":0.24251481577588913,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313201678","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9071474,0.00014867887,0.052731227,0.00040439205,0.000020846344,0.00022228871,0.0013645174,0.00049520435,0.03746549],"genre_scores_gemma":[0.94921994,0.0001346192,0.046377845,0.000016619646,0.0000026380392,0.00009195522,0.00038576496,0.000044876768,0.0037257213],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99966586,0.00010272883,0.000016483673,0.000033632594,0.00011056735,0.00007070017],"domain_scores_gemma":[0.9997036,0.00017296633,0.000020665097,0.000035327,0.000043788703,0.000023702816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006207654,0.0005550248,0.00042824846,0.0009047786,0.00068313867,0.00094758836,0.000690201,0.0010545544,0.0039044728],"category_scores_gemma":[0.00070574513,0.0003789526,0.0008431495,0.0014150523,0.00054511323,0.00059447286,0.0006235868,0.00043096894,0.00039777128],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022585495,0.00040042587,0.0055166464,0.00016474321,0.000023333401,0.0015397235,0.00027418332,0.9519998,0.0043886653,0.0066949767,0.0018436593,0.02692797],"study_design_scores_gemma":[0.000053116204,0.00022912558,0.0047509987,0.000016994081,0.000021558943,0.00034517705,0.00081593107,0.978695,0.00828248,0.002232516,0.0045256866,0.00003139423],"about_ca_topic_score_codex":0.01392262,"about_ca_topic_score_gemma":0.024435524,"teacher_disagreement_score":0.01392262,"about_ca_system_score_codex":0.0013216522,"about_ca_system_score_gemma":0.000989898,"threshold_uncertainty_score":0.027683198},"labels":[],"label_agreement":null},{"id":"W4313259820","doi":"10.3390/su15010201","title":"Health and Safety Improvement through Industrial Revolution 4.0: Malaysian Construction Industry Case","year":2022,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":46,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Yayasan UTP; Universiti Teknologi Petronas","keywords":"Analytic hierarchy process; Engineering; Process (computing); Construction engineering; Building information modeling; Risk analysis (engineering); Occupational safety and health; Construction industry; Industry 4.0; Automation; Engineering management; Construction site safety; Transport engineering; Computer science; Operations management; Operations research; Business","score_opus":0.010202073993809223,"score_gpt":0.2381080489969394,"score_spread":0.22790597500313017,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313259820","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9819334,0.00014807815,0.001545058,0.001030837,0.000010976441,0.00014508794,0.00011528994,0.000014429815,0.015056905],"genre_scores_gemma":[0.99429506,0.00021891423,0.0013814229,0.0000532396,0.000004517716,0.00004102679,0.000053933174,0.0000021045607,0.0039497665],"study_design_codex":"observational","study_design_gemma":"case_report","domain_scores_codex":[0.9990952,0.00038033555,0.000037608577,0.0000444613,0.00014738206,0.000295095],"domain_scores_gemma":[0.9992655,0.00022475666,0.000107439286,0.000043544565,0.000115835915,0.00024297425],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012124261,0.00035257978,0.00015693088,0.0010033242,0.0018661764,0.001125224,0.0009343348,0.0016312042,0.0035438335],"category_scores_gemma":[0.0009237042,0.00021780594,0.00039570528,0.0010077097,0.0012351973,0.00066434854,0.0015824663,0.0007076558,0.00033476143],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017361167,0.008881622,0.40091616,0.0013415234,0.00017104912,0.15302657,0.04141804,0.11881714,0.009051415,0.07571658,0.015334393,0.17358944],"study_design_scores_gemma":[0.000545167,0.004977431,0.34851587,0.0010040764,0.00026757017,0.039026607,0.25883943,0.21228789,0.015199758,0.016305996,0.102745414,0.0002847843],"about_ca_topic_score_codex":0.038083736,"about_ca_topic_score_gemma":0.049448088,"teacher_disagreement_score":0.038083736,"about_ca_system_score_codex":0.00398262,"about_ca_system_score_gemma":0.0033336717,"threshold_uncertainty_score":0.075724125},"labels":[],"label_agreement":null},{"id":"W4313293271","doi":"10.3233/atde220925","title":"Construction-Oriented Architectural Design in Off-Site Construction Towards Lean Construction and Management","year":2022,"lang":"en","type":"book-chapter","venue":"Advances in transdisciplinary engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"China Scholarship Council; Nanjing Tech University; China Postdoctoral Science Foundation; University of British Columbia; National Natural Science Foundation of China","keywords":"Lean project management; Lean construction; Lean manufacturing; Engineering; Architecture; Lean software development; Design thinking; Process management; Design management; Manufacturing engineering; Systems engineering; Knowledge management; Computer science; Construction engineering; Construction industry; Mechanical engineering; Information management","score_opus":0.006195285989473222,"score_gpt":0.20401848933230177,"score_spread":0.19782320334282855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313293271","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007026986,0.015556176,0.25947437,0.0031277784,0.0008521881,0.000103867176,0.00006710135,0.00034135554,0.7134502],"genre_scores_gemma":[0.1417229,0.025090951,0.2825318,0.0012846576,0.0004495527,0.0002430393,0.00027926153,0.00049121375,0.54790664],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99940467,0.00025400665,0.000017616563,0.000045369394,0.00024564384,0.000032674518],"domain_scores_gemma":[0.99974734,0.00010606446,0.000015312067,0.000044565608,0.000061508465,0.00002533602],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007184805,0.00074051233,0.00021522873,0.0010747961,0.0008991409,0.0038657628,0.000826345,0.0009721558,0.008115814],"category_scores_gemma":[0.0004660637,0.00032055276,0.000376869,0.0014875521,0.0029790336,0.001698927,0.0015573262,0.001802425,0.002660838],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009477675,0.000031436874,0.000184329,0.00027274527,0.0000046062937,0.00012429149,0.0021678559,0.0052022687,0.0013777083,0.8585202,0.018585945,0.11351917],"study_design_scores_gemma":[0.0000029232729,0.000022554743,0.0003129847,0.0003680216,0.0000045589013,0.00030160934,0.0010185676,0.0038023307,0.0006742239,0.19221552,0.80126727,0.000009399704],"about_ca_topic_score_codex":0.0015392209,"about_ca_topic_score_gemma":0.0040039425,"teacher_disagreement_score":0.008115814,"about_ca_system_score_codex":0.0017619813,"about_ca_system_score_gemma":0.0014998405,"threshold_uncertainty_score":0.027150154},"labels":[],"label_agreement":null},{"id":"W4313891040","doi":"10.3390/buildings13010163","title":"Digital Technologies in Offsite and Prefabricated Construction: Theories and Applications","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":48,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; New Brunswick Innovation Foundation","keywords":"Emerging technologies; Current (fluid); Focus (optics); Computer science; Prefabrication; Architectural engineering; Digital transformation; Construction engineering; Construction industry; Systems engineering; Engineering; Manufacturing engineering; Civil engineering; World Wide Web; Artificial intelligence","score_opus":0.004467769802596306,"score_gpt":0.19266715991674035,"score_spread":0.18819939011414405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4313891040","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016578756,0.7875654,0.020613382,0.0057138596,0.0008608504,0.00009816964,0.00016324833,0.000058477115,0.1683478],"genre_scores_gemma":[0.12630455,0.85032934,0.011509295,0.0009956617,0.00050191605,0.00009971607,0.00015406769,0.000019314608,0.01008609],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931085,0.00017453718,0.00006176575,0.0001026241,0.0002842604,0.00006609073],"domain_scores_gemma":[0.9988236,0.00078008336,0.00011216052,0.000055517183,0.00018669448,0.000041941552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00093259016,0.00061334006,0.0005989302,0.0050378004,0.0008160772,0.0040953057,0.0008028096,0.001390744,0.0060640452],"category_scores_gemma":[0.0015206466,0.00029145897,0.0006387651,0.0066802367,0.003219332,0.0049778204,0.0016992537,0.0014688203,0.00088217674],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030776882,0.00010869403,0.0030456712,0.0070068943,0.00006438852,0.00055644795,0.0033054599,0.0015987605,0.00086612796,0.47223672,0.006669445,0.50451064],"study_design_scores_gemma":[0.000011300471,0.000120209006,0.00893347,0.013795963,0.00013495499,0.0022816285,0.008225923,0.0023116234,0.0019927619,0.21687454,0.7452341,0.00008346813],"about_ca_topic_score_codex":0.0019582747,"about_ca_topic_score_gemma":0.0024285817,"teacher_disagreement_score":0.0060640452,"about_ca_system_score_codex":0.0018404059,"about_ca_system_score_gemma":0.0021852416,"threshold_uncertainty_score":0.020286322},"labels":[],"label_agreement":null},{"id":"W4317401357","doi":"10.18280/mmep.090611","title":"Managing Cost and Schedule Evaluation of a Construction Project via BIM Technology and Experts’ Points of View","year":2022,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Schedule; Project management; Building information modeling; Software; Computer science; Software project management; Cost estimate; Project planning; Construction management; Engineering management; Pre-construction services; Resource (disambiguation); Facility management; Reliability (semiconductor); Construction engineering; Systems engineering; Operations research; Engineering; Operations management; Scheduling (production processes); Software development; Civil engineering; Business; Software construction","score_opus":0.02750985608775005,"score_gpt":0.23084212891141928,"score_spread":0.20333227282366922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317401357","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6294792,0.00097006623,0.32213724,0.0008222425,0.00011390255,0.00056821946,0.0002327502,0.0006280984,0.045048248],"genre_scores_gemma":[0.89134204,0.00040364743,0.10447204,0.00003087218,0.00003936197,0.00020775551,0.00020987216,0.000060735325,0.0032336635],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.98841673,0.0054468364,0.00060956023,0.0005733064,0.004477782,0.00047571032],"domain_scores_gemma":[0.988214,0.0040845894,0.0020286087,0.0009087895,0.004342139,0.0004218613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008130479,0.00084211415,0.00055109075,0.005610712,0.0009568772,0.0027204845,0.0009406292,0.00066293275,0.0020569752],"category_scores_gemma":[0.016737254,0.0004383984,0.00040469962,0.0022560703,0.00046487772,0.0026982375,0.0017634849,0.0004968366,0.0005332304],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005383829,0.00039520778,0.052433304,0.00062235334,0.000103311664,0.00083900476,0.00844236,0.058732115,0.017182244,0.013100552,0.004119521,0.8434917],"study_design_scores_gemma":[0.00013343817,0.00214006,0.24014486,0.0010188229,0.00045594483,0.0025458406,0.037583843,0.57177013,0.046407748,0.022217333,0.074970484,0.0006115007],"about_ca_topic_score_codex":0.0025080256,"about_ca_topic_score_gemma":0.0036598172,"teacher_disagreement_score":0.008130479,"about_ca_system_score_codex":0.0013888341,"about_ca_system_score_gemma":0.0021488173,"threshold_uncertainty_score":0.042998552},"labels":[],"label_agreement":null},{"id":"W4317792690","doi":"10.1109/wsc57314.2022.10015308","title":"Accelerating Training of Reinforcement Learning-Based Construction Robots in Simulation Using Demonstrations Collected in Virtual Reality","year":2022,"lang":"en","type":"article","venue":"2022 Winter Simulation Conference (WSC)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Reinforcement learning; Robot; Computer science; Flexibility (engineering); Task (project management); Economic shortage; Human–computer interaction; Virtual reality; Artificial intelligence; Simulation; Engineering; Systems engineering","score_opus":0.07354045546339771,"score_gpt":0.2889406442721747,"score_spread":0.21540018880877698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4317792690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.71058655,0.00020180963,0.28051516,0.00030786076,0.00010445292,0.00023843942,0.00011562634,0.002531691,0.0053984015],"genre_scores_gemma":[0.9603689,0.00005128398,0.038511034,0.000047379974,0.0000055737532,0.00010794348,0.000118721306,0.000034339602,0.0007547512],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99953485,0.0001913652,0.000027251379,0.00009001643,0.000074287185,0.00008232383],"domain_scores_gemma":[0.9973742,0.0016314884,0.00021868495,0.00031224362,0.00027364286,0.00018972952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001270821,0.00079545093,0.00046366203,0.0002604334,0.00022543526,0.0003856533,0.000996244,0.000692133,0.0018377528],"category_scores_gemma":[0.0051636337,0.00039427463,0.00030004542,0.000121294695,0.0005261475,0.0005924205,0.0008644686,0.0008990227,0.00030519467],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023810443,0.00045739685,0.002695691,0.00008698146,0.00003971777,0.000083999555,0.00014498715,0.95662117,0.007501225,0.00064323307,0.00050959457,0.0309779],"study_design_scores_gemma":[0.000036994817,0.00021757375,0.00081624865,0.000010695503,0.000008386691,0.0000149151465,0.000025739402,0.9940035,0.0039380253,0.0003661008,0.0005514738,0.000010307791],"about_ca_topic_score_codex":0.004526115,"about_ca_topic_score_gemma":0.004846355,"teacher_disagreement_score":0.004526115,"about_ca_system_score_codex":0.00044848165,"about_ca_system_score_gemma":0.00080628146,"threshold_uncertainty_score":0.0089995265},"labels":[],"label_agreement":null},{"id":"W4318339150","doi":"10.31586/wjcea.2023.569","title":"A framework for the evaluation of the decision between onsite and offsite construction using life cycle analysis (LCA) concepts and system dynamics modeling","year":2023,"lang":"en","type":"article","venue":"Trends journal of sciences research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Factory (object-oriented programming); Transport engineering; Engineering; Yard; Construction management; Civil engineering; Construction engineering; Computer science","score_opus":0.2048095338506021,"score_gpt":0.4577149916723511,"score_spread":0.252905457821749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318339150","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037629642,0.00037497972,0.9805413,0.00044133168,0.000054692457,0.00042843146,0.00026591972,0.0002638639,0.013866578],"genre_scores_gemma":[0.22237755,0.0012335685,0.76990265,0.00014179539,0.000048485694,0.002165199,0.00054987596,0.0000823,0.0034985342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99572396,0.0022374885,0.00021007666,0.00039663078,0.0011312857,0.00030043462],"domain_scores_gemma":[0.9974727,0.0012793242,0.00031406013,0.0001261385,0.00064179534,0.00016603792],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005097126,0.0030090928,0.0015423953,0.0039497265,0.0012199053,0.00532859,0.00288397,0.00225073,0.0056046178],"category_scores_gemma":[0.005486222,0.0007552142,0.002445019,0.0022743293,0.0017452327,0.0032753542,0.0028224932,0.0022090792,0.0007764028],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023233899,0.00012412448,0.0005635622,0.00020130989,0.00005342469,0.0001624225,0.00013076206,0.7081843,0.0009826038,0.26758677,0.0013481708,0.020639345],"study_design_scores_gemma":[0.000022443339,0.00015952828,0.0003272047,0.0002003182,0.000030141482,0.00005003244,0.00023961555,0.8971611,0.00063473394,0.089875236,0.011250361,0.000049280578],"about_ca_topic_score_codex":0.02666543,"about_ca_topic_score_gemma":0.017836062,"teacher_disagreement_score":0.02666543,"about_ca_system_score_codex":0.0059677744,"about_ca_system_score_gemma":0.009689305,"threshold_uncertainty_score":0.053020418},"labels":[],"label_agreement":null},{"id":"W4318474275","doi":"10.3311/ccc2022-019","title":"Clash Avoidance in BIM Based Multidisciplinary Coordination: A Literature Overview","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Multidisciplinary approach; Process (computing); Inefficiency; Computer science; Documentation; Situation awareness; Process management; Knowledge management; Principal (computer security); Situational ethics; Work (physics); Risk analysis (engineering); Systems engineering; Engineering; Business; Computer security; Political science","score_opus":0.010461600647491978,"score_gpt":0.22530862375404528,"score_spread":0.2148470231065533,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318474275","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0064642974,0.9408482,0.03164404,0.0023603747,0.0006380534,0.00012958207,0.00012087157,0.00012258501,0.017672086],"genre_scores_gemma":[0.08162073,0.8922458,0.021586213,0.0010061513,0.00096464227,0.00016434763,0.00030226412,0.000064466585,0.002045344],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9940327,0.002092269,0.0007303569,0.0011533635,0.0016851488,0.0003061704],"domain_scores_gemma":[0.9821169,0.013374938,0.0011408214,0.000646144,0.0024559498,0.0002653182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045952024,0.0015271584,0.0012586478,0.009938624,0.0018079,0.0072886394,0.002925231,0.0036224583,0.004132531],"category_scores_gemma":[0.012460216,0.001120277,0.0011950036,0.015665304,0.0038359382,0.006973008,0.0030707843,0.0020964025,0.0010533584],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000086370295,0.00021059511,0.003934403,0.026436048,0.00020358854,0.0004225549,0.0048612473,0.0041528414,0.00061748177,0.08528829,0.009977153,0.8638094],"study_design_scores_gemma":[0.000026655038,0.00030191863,0.012827285,0.08437547,0.00088319636,0.004092741,0.021243168,0.016395047,0.0030087684,0.09318871,0.76337296,0.000284138],"about_ca_topic_score_codex":0.0061873165,"about_ca_topic_score_gemma":0.0041673505,"teacher_disagreement_score":0.009938624,"about_ca_system_score_codex":0.0026838304,"about_ca_system_score_gemma":0.0047630304,"threshold_uncertainty_score":0.024302065},"labels":[],"label_agreement":null},{"id":"W4318474430","doi":"10.3311/ccc2022-032","title":"Chronographical Modelling for Repetitive Project","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Gantt chart; Schedule; Computer science; Resource (disambiguation); Project management; Industrial engineering; Operations research; Work (physics); Sequence (biology); Linear programming; Systems engineering; Construction engineering; Engineering; Algorithm","score_opus":0.018164692871136544,"score_gpt":0.21824276633803988,"score_spread":0.20007807346690334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318474430","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004152086,0.00039198287,0.9516678,0.00019472909,0.00014526164,0.00019026137,0.0010512278,0.0008985019,0.041308172],"genre_scores_gemma":[0.15980735,0.0020733806,0.77807015,0.00012077112,0.000093025854,0.0011196459,0.0034019265,0.00057908637,0.054734696],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990563,0.00028666423,0.00009283576,0.00022779203,0.00025713744,0.000079398684],"domain_scores_gemma":[0.99884343,0.0003841699,0.00016063539,0.00027874007,0.00026321586,0.000069677975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010357591,0.0008416381,0.00041381875,0.0016433288,0.00091109984,0.0022325611,0.0016172064,0.0010011017,0.029724909],"category_scores_gemma":[0.0028720528,0.00044624094,0.0012710565,0.002792363,0.0009066992,0.0023734674,0.0012888703,0.000930036,0.006121986],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010567416,0.00006761882,0.0015485655,0.00034975543,0.000028277458,0.00054182805,0.0010094993,0.23489091,0.0022550551,0.6639741,0.009030881,0.0861978],"study_design_scores_gemma":[0.000046792047,0.000089685826,0.0008629836,0.00025615035,0.00004923915,0.00061554724,0.00055346946,0.39775577,0.002129295,0.1747017,0.4228778,0.00006153597],"about_ca_topic_score_codex":0.016359698,"about_ca_topic_score_gemma":0.02087652,"teacher_disagreement_score":0.029724909,"about_ca_system_score_codex":0.0012392205,"about_ca_system_score_gemma":0.0025656377,"threshold_uncertainty_score":0.09943968},"labels":[],"label_agreement":null},{"id":"W4318618521","doi":"10.1007/978-3-031-25182-5_44","title":"The Importance of Preparing Customized TRIZ Matrix to Accelerate the Innovation for Design Buildings","year":2023,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"TRIZ; Architectural engineering; Matrix (chemical analysis); Engineering; Manufacturing engineering; Computer science; Materials science; Composite material","score_opus":0.015179267836863394,"score_gpt":0.26889710399927186,"score_spread":0.25371783616240845,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318618521","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0697178,0.008811093,0.47194648,0.0037941982,0.0022443924,0.00029284696,0.00026908843,0.0019596599,0.44096446],"genre_scores_gemma":[0.37065586,0.008063444,0.4189801,0.00052750506,0.00030902683,0.00020337781,0.00037690907,0.00080151326,0.2000823],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996555,0.00004133595,0.000010683999,0.00003742167,0.00021932901,0.000035735364],"domain_scores_gemma":[0.99967015,0.000078225305,0.000030285733,0.000058434707,0.00013483987,0.000028124365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004552391,0.0004187887,0.00022662962,0.00075392774,0.0005468198,0.0020045796,0.0005593877,0.0006785875,0.011045658],"category_scores_gemma":[0.00080114434,0.00022856987,0.00023573202,0.0007836863,0.00046865584,0.0020574715,0.0008932273,0.0010771372,0.0033921746],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005388503,0.00012726271,0.0007376187,0.0007200778,0.000012752652,0.00034094867,0.00067148876,0.015156772,0.1612939,0.2752005,0.020634823,0.5250499],"study_design_scores_gemma":[0.000021941009,0.00030563178,0.0034544808,0.00022380511,0.00004124463,0.0015408541,0.0009830329,0.040551413,0.17349581,0.0805564,0.6987551,0.000070311464],"about_ca_topic_score_codex":0.0008381978,"about_ca_topic_score_gemma":0.0021734568,"teacher_disagreement_score":0.011045658,"about_ca_system_score_codex":0.00065916654,"about_ca_system_score_gemma":0.0008858825,"threshold_uncertainty_score":0.036951423},"labels":[],"label_agreement":null},{"id":"W4318943137","doi":"10.37256/dmt.3120231856","title":"Building Information Modeling (BIM) and Robotic Manufacturing Technological Interoperability in Construction – A Cyclic Systematic Literature Review","year":2023,"lang":"en","type":"article","venue":"Digital Manufacturing Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Mitacs","keywords":"Interoperability; Building information modeling; Operationalization; Engineering; Bridge (graph theory); Systems engineering; Information model; Manufacturing engineering; Computer science; Engineering management; Knowledge management; Software engineering; Operations management; World Wide Web","score_opus":0.007623162048467395,"score_gpt":0.20685296142738654,"score_spread":0.19922979937891916,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4318943137","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013794604,0.9953537,0.0009778659,0.00061542436,0.00010651032,0.00016465425,0.00016371401,0.000007932407,0.0012306592],"genre_scores_gemma":[0.013920575,0.9820655,0.00289861,0.000377062,0.00007182148,0.00027674166,0.0002033515,0.000006496576,0.00017985662],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9930211,0.0029526197,0.0017901901,0.00047819896,0.0015706555,0.00018729434],"domain_scores_gemma":[0.96751046,0.02582991,0.0026711433,0.000604508,0.0031398092,0.00024412398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0099165905,0.0010201441,0.0021090354,0.020785274,0.0008908343,0.002909004,0.001304882,0.0017392393,0.0028272066],"category_scores_gemma":[0.026473239,0.00077967695,0.0019916042,0.02128754,0.0015577466,0.003636099,0.0020848042,0.0010527044,0.00044423642],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060574086,0.00009970438,0.0019980492,0.5531643,0.00097065105,0.0004538421,0.0028391655,0.00073270855,0.000504181,0.0103744585,0.006665339,0.42213696],"study_design_scores_gemma":[0.000023847959,0.00014726818,0.004922274,0.8043724,0.0042115594,0.0011758601,0.003890732,0.00044422585,0.00046918704,0.0041537317,0.17612198,0.00006697734],"about_ca_topic_score_codex":0.007490213,"about_ca_topic_score_gemma":0.021476021,"teacher_disagreement_score":0.020785274,"about_ca_system_score_codex":0.0028356963,"about_ca_system_score_gemma":0.020881107,"threshold_uncertainty_score":0.052444577},"labels":[],"label_agreement":null},{"id":"W4319157507","doi":"10.2138/gselements.18.5.291","title":"On the Path to Decarbonisation","year":2022,"lang":"en","type":"article","venue":"Elements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"LafargeHolcim (Canada)","funders":"","keywords":"Cement; Focus (optics); Architectural engineering; Key (lock); Sky; Embodied cognition; Path (computing); Civil engineering; Environmental science; Engineering; Computer science; Materials science; Geography; Meteorology; Composite material; Artificial intelligence; Physics","score_opus":0.008473131760718173,"score_gpt":0.20309224356545566,"score_spread":0.19461911180473748,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319157507","genre_codex":"commentary","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009771907,0.053613313,0.013289178,0.5803855,0.01433442,0.000047886067,0.0004940668,0.00057137676,0.3274923],"genre_scores_gemma":[0.37690789,0.11487736,0.02983379,0.22906895,0.0078389775,0.00025915194,0.0010863991,0.0015547323,0.23857279],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.997497,0.00066527986,0.0000618678,0.00038514953,0.00083190366,0.00055875984],"domain_scores_gemma":[0.998109,0.0004383237,0.00010270342,0.00027695938,0.00058344426,0.00048959226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038105117,0.000647655,0.00059117423,0.0006757501,0.0022369982,0.007544156,0.0012726076,0.0043782173,0.025938118],"category_scores_gemma":[0.005926008,0.00023189637,0.00040972463,0.001051049,0.005720548,0.013327399,0.008185115,0.00871809,0.006760677],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050664814,0.000039550214,0.00033403336,0.00018942542,0.000012311984,0.00007591407,0.00063515775,0.0005568622,0.0004145137,0.81216353,0.13539343,0.050134607],"study_design_scores_gemma":[0.000007891103,0.0000189536,0.00031570691,0.00034159276,0.0000041451185,0.00003466084,0.0007771513,0.00023050146,0.0003402414,0.30741298,0.6905022,0.0000139638505],"about_ca_topic_score_codex":0.0037807978,"about_ca_topic_score_gemma":0.0046235276,"teacher_disagreement_score":0.025938118,"about_ca_system_score_codex":0.0030749985,"about_ca_system_score_gemma":0.0067541455,"threshold_uncertainty_score":0.08677167},"labels":[],"label_agreement":null},{"id":"W4319653543","doi":"","title":"THE USE OF COMPUTER DYNAMIC SHAPING FOR MODELING OF ENGINEERING STRUCTURES AND BUILDINGS","year":2017,"lang":"en","type":"article","venue":"DOAJ (DOAJ: Directory of Open Access Journals)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill-Queen's University Press","funders":"","keywords":"Computer science; Computer modelling; Architectural engineering; Engineering; Software engineering; Computer software","score_opus":0.20719038561092676,"score_gpt":0.45905389232515675,"score_spread":0.25186350671422997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4319653543","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009631587,0.00020897266,0.98612076,0.000028951607,0.00001306504,0.000009512536,0.000015836524,0.000268392,0.0037028205],"genre_scores_gemma":[0.5719243,0.00095336704,0.42218646,0.00004464655,0.000028010352,0.00005437432,0.00014479752,0.00020147981,0.004462486],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968433,0.000082327344,0.000009803181,0.000053390617,0.00014958697,0.000020669055],"domain_scores_gemma":[0.99977845,0.00010372044,0.000018635143,0.000063893785,0.000028091277,0.0000072007097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027614922,0.00043307815,0.00031792404,0.00053018803,0.00026851406,0.00067592174,0.00055967196,0.00045335616,0.0012610332],"category_scores_gemma":[0.0005913433,0.00026198992,0.00060007384,0.00053740724,0.0007058094,0.00062113587,0.00053625286,0.00047792084,0.00039335203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000044277615,0.000022730213,0.00089070626,0.000110975576,0.000029570116,0.00016026973,0.0002141903,0.6535041,0.03372241,0.13778935,0.0006796105,0.17283182],"study_design_scores_gemma":[0.000004395669,0.00005735842,0.00041794273,0.000024639263,0.00001650228,0.0003764436,0.000035834466,0.93677264,0.014473913,0.02051059,0.027287927,0.000021779979],"about_ca_topic_score_codex":0.0015265703,"about_ca_topic_score_gemma":0.0014922865,"teacher_disagreement_score":0.0015265703,"about_ca_system_score_codex":0.00032473044,"about_ca_system_score_gemma":0.0003431503,"threshold_uncertainty_score":0.0042185783},"labels":[],"label_agreement":null},{"id":"W4320081667","doi":"10.1061/jcemd4.coeng-13385","title":"Modular Construction/Off-Site Construction","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; University of New Brunswick; University of Alberta","funders":"","keywords":"Modular design; Modular construction; Computer science; Construction engineering; Engineering; Programming language","score_opus":0.004072894585175111,"score_gpt":0.1744510038814622,"score_spread":0.17037810929628708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320081667","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45160544,0.00046217188,0.08455631,0.00025249863,0.00021215314,0.00017380936,0.00059495197,0.0011312019,0.46101153],"genre_scores_gemma":[0.91772306,0.0002693556,0.026792368,0.00007884166,0.000043489123,0.0000452246,0.0005967328,0.00029203246,0.054158762],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99945503,0.000059753696,0.00002690345,0.000070401686,0.00024266183,0.00014523632],"domain_scores_gemma":[0.9996124,0.000039022598,0.000055711025,0.0001435154,0.00008911609,0.000060166214],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000516277,0.0006958058,0.00023940638,0.0011532513,0.00043839417,0.0009699584,0.0005182128,0.00041974653,0.026590642],"category_scores_gemma":[0.0006449869,0.00023186897,0.0004873786,0.00077519857,0.00087489065,0.0010395932,0.0021786387,0.000417757,0.0051543904],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004967229,0.00042984376,0.027378187,0.0005349959,0.000048155256,0.0011369481,0.0011910052,0.015509516,0.062750645,0.14179394,0.0136239,0.73510617],"study_design_scores_gemma":[0.00010874881,0.0015834135,0.25849512,0.00073233753,0.00019738212,0.00876329,0.0054448326,0.051124427,0.089689225,0.10294204,0.48077255,0.00014664319],"about_ca_topic_score_codex":0.00086679996,"about_ca_topic_score_gemma":0.003119261,"teacher_disagreement_score":0.026590642,"about_ca_system_score_codex":0.0003464788,"about_ca_system_score_gemma":0.000585995,"threshold_uncertainty_score":0.08895457},"labels":[],"label_agreement":null},{"id":"W4320802102","doi":"10.1109/icdabi56818.2022.10041472","title":"Innovation in Construction: A new norm against Traditional Construction","year":2022,"lang":"en","type":"article","venue":"2022 International Conference on Data Analytics for Business and Industry (ICDABI)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Construction industry; Scopus; Norm (philosophy); Knowledge management; Computer science; Construction engineering; Engineering management; Engineering; Business; Political science","score_opus":0.1146396685007976,"score_gpt":0.2768311811639607,"score_spread":0.16219151266316312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4320802102","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01391526,0.6724555,0.044323422,0.18665926,0.018868418,0.00036327398,0.0007566942,0.0002112576,0.062446862],"genre_scores_gemma":[0.44758052,0.36912984,0.0773224,0.07942067,0.013195952,0.0022026459,0.00082460383,0.00048162197,0.009841681],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.8725269,0.06445313,0.012574136,0.010144186,0.03893741,0.0013642249],"domain_scores_gemma":[0.80824745,0.14850627,0.011957271,0.010950822,0.01845785,0.0018802523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06712538,0.0007507592,0.0029164613,0.010805301,0.003354161,0.021970615,0.0024756098,0.004752563,0.0034667875],"category_scores_gemma":[0.0865357,0.00043709853,0.001205469,0.013478988,0.0353428,0.022951474,0.009294839,0.007724233,0.0009022885],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024799278,0.00008243361,0.0041922787,0.042808305,0.00045707586,0.0003119858,0.03680487,0.00030321768,0.001892934,0.5794721,0.04207196,0.29135484],"study_design_scores_gemma":[0.000039862047,0.0001748077,0.0043534976,0.053894274,0.00030975332,0.0006883355,0.029016761,0.00024194912,0.0008025481,0.17636395,0.7340121,0.000102148886],"about_ca_topic_score_codex":0.0037975118,"about_ca_topic_score_gemma":0.006600891,"teacher_disagreement_score":0.06712538,"about_ca_system_score_codex":0.008114474,"about_ca_system_score_gemma":0.021346249,"threshold_uncertainty_score":0.35499716},"labels":[],"label_agreement":null},{"id":"W4321100518","doi":"10.1108/jedt-02-2022-0096","title":"Using the TOE theoretical framework to study the adoption of BIM-AR in a developing country: the case of Ghana","year":2023,"lang":"en","type":"article","venue":"Journal of Engineering Design and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":21,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College","funders":"","keywords":"Building information modeling; Context (archaeology); Business; Pace; Snowball sampling; Nonprobability sampling; Originality; Value (mathematics); Marketing; Developing country; Process management; Knowledge management; Operations management; Computer science; Engineering; Economics; Qualitative research","score_opus":0.01848475664339835,"score_gpt":0.25397976207050654,"score_spread":0.2354950054271082,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321100518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9674974,0.00056814565,0.0066859056,0.0032667858,0.000012782509,0.0001623532,0.00008027024,0.000009021062,0.021717245],"genre_scores_gemma":[0.99564594,0.00042910944,0.0030603553,0.0001055045,0.00000210451,0.00006512477,0.000021437481,0.000003006492,0.0006673961],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988135,0.0007925213,0.000041387048,0.00006830635,0.00008692534,0.0001973338],"domain_scores_gemma":[0.99688834,0.0022120464,0.00046705364,0.000084229156,0.0002141023,0.00013416182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017371088,0.0003158332,0.00018990564,0.0016638031,0.001709718,0.0017535699,0.00053938606,0.00062149705,0.0034250047],"category_scores_gemma":[0.0030137387,0.00024541182,0.00023338693,0.0023879465,0.0029178676,0.002315406,0.0018958858,0.0009742308,0.00018617125],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014432546,0.00070230465,0.29713994,0.0010835811,0.0000583137,0.027350806,0.27308458,0.00650052,0.0028525621,0.26186278,0.0034440127,0.1257762],"study_design_scores_gemma":[0.00005077787,0.00023058587,0.101586096,0.0014184979,0.00006105012,0.0028397704,0.8172731,0.010886627,0.00093465677,0.026016993,0.03865314,0.00004864955],"about_ca_topic_score_codex":0.021280658,"about_ca_topic_score_gemma":0.031151976,"teacher_disagreement_score":0.021280658,"about_ca_system_score_codex":0.0038112646,"about_ca_system_score_gemma":0.0032711723,"threshold_uncertainty_score":0.042313576},"labels":[],"label_agreement":null},{"id":"W4321275887","doi":"10.17148/ijarcce.2023.12205","title":"Role of Artificial Intelligence in the Construction Industry – A Systematic Review","year":2023,"lang":"en","type":"review","venue":"IJARCCE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Western University","funders":"Kalinga Institute of Industrial Technology","keywords":"Quality (philosophy); Reliability (semiconductor); Risk analysis (engineering); Applications of artificial intelligence; Engineering; Computer science; Systems engineering; Construction engineering; Engineering management; Artificial intelligence","score_opus":0.05259661013394831,"score_gpt":0.3098943277072032,"score_spread":0.2572977175732549,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321275887","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00009932235,0.999131,0.00008426718,0.00025789716,0.00006576801,0.000016141046,0.000032167787,0.0000030096303,0.00031025347],"genre_scores_gemma":[0.0008815832,0.9986324,0.0001918117,0.00014641765,0.000043995522,0.000020718231,0.000027449894,0.0000014099431,0.000054170716],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.9978623,0.0006218785,0.00055878906,0.00018279237,0.0007001062,0.00007420921],"domain_scores_gemma":[0.9846808,0.012343173,0.0011525073,0.00020053412,0.0014619175,0.00016116642],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0039687455,0.0010431702,0.0024291568,0.009653089,0.0005014548,0.002751767,0.0015073013,0.0017443307,0.005902406],"category_scores_gemma":[0.014613137,0.0005534015,0.0025230942,0.009089872,0.00092552864,0.0025555247,0.0010903723,0.001286518,0.00073808664],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008365571,0.00006117027,0.0006524794,0.39419055,0.0009428525,0.00015391834,0.0002585215,0.00042192894,0.00017417598,0.002776876,0.013706219,0.5865776],"study_design_scores_gemma":[0.000047900274,0.0001858346,0.004134747,0.59254026,0.0050648144,0.0012423522,0.0004065304,0.0002850162,0.00023361089,0.003376875,0.39241946,0.00006266295],"about_ca_topic_score_codex":0.004643137,"about_ca_topic_score_gemma":0.011841968,"teacher_disagreement_score":0.009653089,"about_ca_system_score_codex":0.0019180978,"about_ca_system_score_gemma":0.007994394,"threshold_uncertainty_score":0.020989},"labels":[],"label_agreement":null},{"id":"W4321768227","doi":"10.1016/j.autcon.2023.104808","title":"Optimized decision support for BIM maturity assessment","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":99,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Research Grants Council, University Grants Committee; National Social Science Fund of China; National Natural Science Foundation of China; City University of Hong Kong","keywords":"Maturity (psychological); Capability Maturity Model; Building information modeling; Process (computing); Function (biology); Engineering; Process management; Systems engineering; Risk analysis (engineering); Computer science; Operations management; Business; Software","score_opus":0.01209271287198242,"score_gpt":0.2770197122604636,"score_spread":0.2649269993884812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4321768227","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06306573,0.00016855722,0.9273599,0.0001767356,0.000049906455,0.00012084881,0.00056845386,0.0036551575,0.004834697],"genre_scores_gemma":[0.75906473,0.00009434682,0.23814288,0.000059605012,0.000022201657,0.000092056405,0.0008117122,0.0002082561,0.0015042974],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99825114,0.0005582623,0.00012231269,0.00020946251,0.0006651551,0.00019351396],"domain_scores_gemma":[0.997294,0.0014429274,0.00018040274,0.00026485082,0.0007287349,0.00008912427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014855809,0.00087854126,0.0008671531,0.0016235173,0.00044575793,0.0027792724,0.0010176197,0.0007357299,0.007697461],"category_scores_gemma":[0.007995691,0.00052921,0.00058142876,0.0012851714,0.0002668585,0.0015519216,0.001227871,0.0007736481,0.0017068004],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013680886,0.0003853629,0.004839398,0.000208626,0.00012584722,0.00022768631,0.0002139366,0.49876067,0.016632514,0.019954462,0.006462673,0.4508207],"study_design_scores_gemma":[0.000017172106,0.00003947154,0.0004366804,0.00000881392,0.000014111952,0.000016605029,0.000026356454,0.990761,0.004108812,0.0037456895,0.00081624195,0.0000090069625],"about_ca_topic_score_codex":0.005212369,"about_ca_topic_score_gemma":0.0055012885,"teacher_disagreement_score":0.007697461,"about_ca_system_score_codex":0.0007586455,"about_ca_system_score_gemma":0.0014507911,"threshold_uncertainty_score":0.025750577},"labels":[],"label_agreement":null},{"id":"W4322490938","doi":"10.1016/j.autcon.2023.104803","title":"Computer vision-based process time data acquisition for offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":28,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Alberta Innovates","keywords":"Workstation; Data acquisition; Factory (object-oriented programming); Process (computing); Engineering; Framing (construction); Real-time computing; Computer science; Frame (networking); Set (abstract data type); Simulation; Engineering drawing; Operating system; Mechanical engineering; Civil engineering","score_opus":0.012130677545308508,"score_gpt":0.2606846631337291,"score_spread":0.24855398558842062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322490938","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21689102,0.0004187441,0.76528907,0.00016395001,0.00015620278,0.00019158269,0.00074394635,0.004945402,0.011200168],"genre_scores_gemma":[0.7653108,0.00024227164,0.22781977,0.000078691,0.00003431309,0.00009133854,0.0011295468,0.00022386387,0.0050693816],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99946934,0.000054987293,0.000017658595,0.0000898786,0.00031471282,0.00005346009],"domain_scores_gemma":[0.99955374,0.000054415,0.000043706586,0.000059869293,0.00025736415,0.000030861953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036113945,0.00038138768,0.0004932318,0.0014929154,0.0002875515,0.0007793969,0.00060239836,0.00045772156,0.0036212415],"category_scores_gemma":[0.0007402908,0.00026540685,0.00023258236,0.0011638941,0.00020187271,0.00069325615,0.0005989715,0.00057554763,0.0011980457],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007249053,0.00048073026,0.0042368416,0.00017212573,0.00003978744,0.00011929307,0.00016782494,0.017383436,0.2462521,0.002293811,0.0071683507,0.72096074],"study_design_scores_gemma":[0.00004362985,0.00036460208,0.02572702,0.000034793407,0.000056312376,0.0004422212,0.00018095026,0.7899797,0.1666638,0.0018709232,0.014556991,0.00007917973],"about_ca_topic_score_codex":0.003487767,"about_ca_topic_score_gemma":0.005397006,"teacher_disagreement_score":0.0036212415,"about_ca_system_score_codex":0.00033225946,"about_ca_system_score_gemma":0.0009908275,"threshold_uncertainty_score":0.012114286},"labels":[],"label_agreement":null},{"id":"W4322747791","doi":"10.1007/978-3-031-23876-5_12","title":"Locating a New Fulfillment Center with the Domain Criterion","year":2023,"lang":"en","type":"book-chapter","venue":"International series in management science/operations research/International series in operations research & management science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Diversification (marketing strategy); Phenomenon; History; Advertising; Geography; Genealogy; Business; Marketing","score_opus":0.04286646769351254,"score_gpt":0.3503195925764155,"score_spread":0.30745312488290294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4322747791","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.123561725,0.00042291865,0.65152985,0.001548762,0.0002604017,0.00031401427,0.00038946915,0.0013477452,0.22062506],"genre_scores_gemma":[0.5948784,0.0003450851,0.32837182,0.0001648643,0.00015995036,0.00014601181,0.00073163776,0.00067536556,0.074526876],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990576,0.00012033132,0.000040591705,0.0002450623,0.00030251607,0.00023394472],"domain_scores_gemma":[0.999025,0.00022243656,0.000095210315,0.0001821836,0.00025053546,0.00022463915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010736263,0.00072008074,0.00091624213,0.002384683,0.002361855,0.0045394893,0.0017606247,0.0019303132,0.026781695],"category_scores_gemma":[0.0031549418,0.0004930541,0.0008842356,0.0019833643,0.0018214023,0.0058924453,0.0037548305,0.0016421435,0.0063611767],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006999169,0.0002510678,0.0036227936,0.00024534445,0.00003357828,0.0010224587,0.0012898555,0.027155805,0.019298533,0.662555,0.025136603,0.25868905],"study_design_scores_gemma":[0.00013217857,0.0005796419,0.0039374735,0.0002246787,0.00009040031,0.0016301825,0.0037194768,0.35507235,0.043921527,0.37558028,0.2149572,0.0001546062],"about_ca_topic_score_codex":0.0027223441,"about_ca_topic_score_gemma":0.0034153424,"teacher_disagreement_score":0.026781695,"about_ca_system_score_codex":0.0020278986,"about_ca_system_score_gemma":0.0025848167,"threshold_uncertainty_score":0.08959377},"labels":[],"label_agreement":null},{"id":"W4323566250","doi":"10.1201/9781003354222-41","title":"Predicting semantic building information (BIM) with Recurrent Neural Networks","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Computer science; Artificial neural network; Artificial intelligence; Engineering; Operations management","score_opus":0.009826756204418731,"score_gpt":0.18762392994834753,"score_spread":0.1777971737439288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4323566250","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17101656,0.00097598956,0.8213592,0.00035731195,0.000097106844,0.000048179045,0.00033848686,0.0014579848,0.004349193],"genre_scores_gemma":[0.8454839,0.00055406505,0.14807542,0.00007738466,0.00004674025,0.00009168698,0.0008419301,0.000078821125,0.0047499877],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984515,0.00003818217,0.000007210378,0.000050313538,0.000040044077,0.000019139128],"domain_scores_gemma":[0.9996569,0.0002026052,0.000039164184,0.000025939547,0.00006441393,0.000010853732],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000547645,0.0007654509,0.00043087796,0.00069657376,0.00015576788,0.0005974,0.0009042218,0.0006576609,0.0009958437],"category_scores_gemma":[0.0016247341,0.00042861523,0.0005125165,0.00087027706,0.0003068466,0.00094680366,0.0006257992,0.0007912781,0.0003750562],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074333584,0.00006630498,0.0016389309,0.00005275053,0.00004689591,0.00008113906,0.00006377923,0.8328923,0.0033408205,0.0032229247,0.001346813,0.1571731],"study_design_scores_gemma":[7.1010584e-7,0.0000051191632,0.00014705978,0.0000019278211,0.0000029058083,0.000003212724,0.0000023050302,0.9986205,0.00033511932,0.00078269927,0.00009648878,0.0000018458643],"about_ca_topic_score_codex":0.0070832563,"about_ca_topic_score_gemma":0.009503305,"teacher_disagreement_score":0.0070832563,"about_ca_system_score_codex":0.0005576419,"about_ca_system_score_gemma":0.0003096487,"threshold_uncertainty_score":0.014084101},"labels":[],"label_agreement":null},{"id":"W4324265153","doi":"10.2139/ssrn.4384337","title":"How Binding are Binding Guidelines? An Analytical Framework","year":2023,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Binding site; Chemistry; Biochemistry","score_opus":0.027390870290876865,"score_gpt":0.28220700910808794,"score_spread":0.25481613881721105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4324265153","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034949034,0.0014814757,0.53172064,0.029733144,0.0003204987,0.00038671485,0.0002986892,0.00025625923,0.40085357],"genre_scores_gemma":[0.83869773,0.00091691996,0.13846019,0.0021367858,0.00029641716,0.000828534,0.00025461146,0.00023827872,0.018170483],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.96189475,0.021011673,0.0017339673,0.0034628834,0.007882877,0.0040137866],"domain_scores_gemma":[0.92215234,0.05560104,0.004590493,0.0056491923,0.010430197,0.0015766477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.023760453,0.0016140454,0.002241061,0.013248331,0.009949561,0.02192001,0.007775256,0.010629926,0.025673354],"category_scores_gemma":[0.080615014,0.0022233191,0.0020294983,0.0121174585,0.040417798,0.044969056,0.0092076,0.008060078,0.0026173186],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000003135054,0.0000142623185,0.0001168369,0.000015023265,0.00000460206,0.000021966322,0.00073027273,0.00036998614,0.000015499267,0.9958229,0.0004594007,0.0024260583],"study_design_scores_gemma":[0.0000047365784,0.0000065650215,0.0001286608,0.000049170187,0.000011242504,0.00003438061,0.0019848223,0.0033247124,0.000049702747,0.9904937,0.0039009638,0.000011412132],"about_ca_topic_score_codex":0.016381498,"about_ca_topic_score_gemma":0.014813767,"teacher_disagreement_score":0.025673354,"about_ca_system_score_codex":0.007853292,"about_ca_system_score_gemma":0.011978744,"threshold_uncertainty_score":0.12565881},"labels":[],"label_agreement":null},{"id":"W4327963475","doi":"10.1016/j.autcon.2023.104782","title":"BIM-driven computational design for robotic manufacturing in off-site construction: an integrated Design-to-Manufacturing (DtM) approach","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":44,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Interoperability; Robotics; Systems engineering; Context (archaeology); Operationalization; Information exchange; Engineering; Robot; Artificial intelligence; Manufacturing engineering; Data exchange; Software engineering; Computer science; Database; World Wide Web","score_opus":0.02880983547325586,"score_gpt":0.24227575331367424,"score_spread":0.21346591784041838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4327963475","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010229435,0.000083321225,0.97879595,0.00018045919,0.000044629145,0.00005476949,0.00010992666,0.0003812754,0.010120233],"genre_scores_gemma":[0.45628932,0.00023371856,0.53613895,0.00023031463,0.00003694019,0.0003315095,0.00036650812,0.0004892457,0.0058834697],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995285,0.0001355772,0.000016409891,0.00005445215,0.00021331465,0.000051699797],"domain_scores_gemma":[0.9993401,0.0003247194,0.000059852217,0.00010521284,0.00013357491,0.000036542744],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008239881,0.00077371224,0.0012061031,0.00077659555,0.0006861221,0.0016382165,0.0021630875,0.0013292421,0.0064212875],"category_scores_gemma":[0.0019943377,0.0010649206,0.0012463126,0.000612971,0.00095198496,0.0010300644,0.0023109743,0.0013300532,0.00095543556],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021874628,0.000050270664,0.00025313636,0.000057353333,0.000016086418,0.000043140237,0.0000507577,0.9663588,0.0011676998,0.01931168,0.0005049714,0.012164174],"study_design_scores_gemma":[0.0000033771594,0.000007699155,0.000041376497,0.000004894861,0.0000026722332,0.000009454277,0.000012291734,0.9944535,0.00034390175,0.0042571872,0.0008609087,0.0000027346696],"about_ca_topic_score_codex":0.0042521353,"about_ca_topic_score_gemma":0.0066826288,"teacher_disagreement_score":0.0064212875,"about_ca_system_score_codex":0.0007922809,"about_ca_system_score_gemma":0.0019472528,"threshold_uncertainty_score":0.021481395},"labels":[],"label_agreement":null},{"id":"W4362561456","doi":"10.1007/s10098-023-02495-2","title":"Environmental sustainability assessment of single-family modular homes using performance benchmarks of conventional homes: case studies in British Columbia, Canada","year":2023,"lang":"en","type":"article","venue":"Clean Technologies and Environmental Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Benchmarking; Benchmark (surveying); Sustainability; Modular design; Environmental economics; Renewable energy; Performance indicator; Engineering; Environmental resource management; Computer science; Business; Environmental science; Economics","score_opus":0.01089352082885561,"score_gpt":0.22635192054585138,"score_spread":0.21545839971699576,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362561456","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9936087,0.00011730884,0.00038950457,0.00006521758,0.0000018223341,0.00004224572,0.00029218404,0.000010319352,0.005472707],"genre_scores_gemma":[0.99806637,0.00008443845,0.0007020729,0.00000780051,3.9655262e-7,0.000012588632,0.00017684608,0.0000045098714,0.000944992],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9988386,0.00018781019,0.0000343223,0.00012741171,0.00048024414,0.00033163672],"domain_scores_gemma":[0.9980388,0.00024580766,0.00011146674,0.00007293705,0.0014025554,0.00012840651],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013760581,0.00044990348,0.00044510872,0.0012615457,0.002637578,0.0020852438,0.0014440874,0.00049791473,0.0012427878],"category_scores_gemma":[0.0023926299,0.00020842512,0.00032887197,0.0037628568,0.0011575724,0.0006271477,0.0008785923,0.00054274907,0.0001095792],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013986977,0.0019031015,0.643355,0.0005683481,0.00028904417,0.003053282,0.009426271,0.13424923,0.006901124,0.01142113,0.008068324,0.17936642],"study_design_scores_gemma":[0.000083588704,0.0004910556,0.852585,0.00025391002,0.00015454314,0.0003081802,0.041909486,0.08971877,0.0039515025,0.0013620416,0.0090718465,0.000109997316],"about_ca_topic_score_codex":0.9859373,"about_ca_topic_score_gemma":0.99545765,"teacher_disagreement_score":0.058077004,"about_ca_system_score_codex":0.058077004,"about_ca_system_score_gemma":0.02142578,"threshold_uncertainty_score":0.42138016},"labels":[],"label_agreement":null},{"id":"W4362664836","doi":"10.3390/buildings13040974","title":"Simulation-Assisted Project Data Integration for Development and Analysis of As-Built Schedules","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Computer science; Process (computing); Duration (music); Systems engineering; Software engineering; Operations research; Engineering; Programming language","score_opus":0.06949791614775487,"score_gpt":0.32833481933901054,"score_spread":0.2588369031912557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362664836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022051178,0.000044168646,0.96640253,0.00006073832,0.000028491704,0.00026564472,0.0010782602,0.006105498,0.0039634025],"genre_scores_gemma":[0.27493304,0.00018654144,0.7186618,0.000019760651,0.000011724535,0.0005458069,0.003289214,0.00046021966,0.0018919385],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99896204,0.00031233503,0.00011482869,0.00016904257,0.00039145324,0.0000503044],"domain_scores_gemma":[0.99775153,0.00081902416,0.00022417592,0.00058425573,0.00052649673,0.00009446862],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002109785,0.0007044234,0.00048007822,0.0019528759,0.0004246022,0.0014077747,0.0010324307,0.000412497,0.0035795164],"category_scores_gemma":[0.0046441727,0.0005168922,0.00073876785,0.0017980882,0.000291224,0.0013446484,0.0008982439,0.0006719765,0.0008936798],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029865574,0.00039143907,0.016564908,0.00040016574,0.00014687913,0.0002859613,0.0012446898,0.670478,0.014958063,0.035048828,0.0063031535,0.2538793],"study_design_scores_gemma":[0.000024296962,0.000046966863,0.0018980799,0.000039577568,0.00002724062,0.0000711988,0.00015040278,0.96725726,0.008633357,0.004176282,0.017640874,0.000034394998],"about_ca_topic_score_codex":0.0067628194,"about_ca_topic_score_gemma":0.010001543,"teacher_disagreement_score":0.0067628194,"about_ca_system_score_codex":0.00086969056,"about_ca_system_score_gemma":0.0023030809,"threshold_uncertainty_score":0.013446927},"labels":[],"label_agreement":null},{"id":"W4362703390","doi":"10.1016/j.autcon.2023.104859","title":"Dynamic integration of unstructured data with BIM using a no-model approach based on machine learning and concept networks","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Unstructured data; Generalizability theory; Classifier (UML); Artificial intelligence; Parametric statistics; Machine learning; Data mining; Data science; Natural language processing; Big data","score_opus":0.014153410771090382,"score_gpt":0.2392545917782159,"score_spread":0.2251011810071255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4362703390","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013771812,0.00010630184,0.98388094,0.00009781271,0.000036326634,0.000033908233,0.00007507038,0.00026951995,0.001728379],"genre_scores_gemma":[0.5352337,0.00034541328,0.4603611,0.00007118031,0.000057905283,0.00017540347,0.00059130904,0.00021022657,0.0029537072],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987301,0.00035003843,0.000064558284,0.00029855152,0.00046885057,0.000087932334],"domain_scores_gemma":[0.99837875,0.00082132843,0.00016319864,0.00027686096,0.00030860692,0.000051256444],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001478352,0.0008559174,0.0012962439,0.0017256899,0.00075433234,0.0023916718,0.0015302917,0.00083659723,0.0020045168],"category_scores_gemma":[0.005531064,0.00095025136,0.001115155,0.0024150386,0.0010309927,0.005096691,0.0030343365,0.0012744082,0.00042768993],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000078517805,0.00009914247,0.0014741808,0.00009831175,0.000079408426,0.00015801878,0.00019958537,0.8730257,0.0024647808,0.035670627,0.000762093,0.08588964],"study_design_scores_gemma":[0.0000020440766,0.000009445776,0.00022509432,0.00000613912,0.000009614622,0.000014384599,0.000025712769,0.9892518,0.0006024988,0.009193803,0.0006530066,0.000006451044],"about_ca_topic_score_codex":0.0114294,"about_ca_topic_score_gemma":0.0120678125,"teacher_disagreement_score":0.0114294,"about_ca_system_score_codex":0.0010124067,"about_ca_system_score_gemma":0.0013338812,"threshold_uncertainty_score":0.022725761},"labels":[],"label_agreement":null},{"id":"W4365814559","doi":"10.1108/ecam-07-2022-0674","title":"Formalizing the information requirements for decision-making of field managers during indoor construction activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scope (computer science); Computer science; Decision support system; Field (mathematics); Quality (philosophy); Work (physics); Task (project management); Originality; Information system; Statement of work; Knowledge management; Information quality; Business decision mapping; Process management; Risk analysis (engineering); Management science; Systems engineering; Engineering; Business; Qualitative research","score_opus":0.005332218608330148,"score_gpt":0.21170978703372964,"score_spread":0.2063775684253995,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4365814559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.41831163,0.0005945051,0.52306455,0.004674179,0.00012853544,0.0035424663,0.00051932636,0.00050402235,0.048660778],"genre_scores_gemma":[0.71675676,0.00025443445,0.27959925,0.00020300309,0.000022872198,0.0013327459,0.00035802985,0.000052654817,0.0014201942],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9758306,0.016747586,0.0020266173,0.0010777396,0.0030297716,0.0012876388],"domain_scores_gemma":[0.92102337,0.06288349,0.005537373,0.0042821798,0.0054156915,0.00085783284],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021933688,0.0009915394,0.00041118,0.002249682,0.002517374,0.0065654125,0.0012913794,0.0013340743,0.004303603],"category_scores_gemma":[0.056419116,0.00080067775,0.0009981286,0.0011258068,0.0031062828,0.0050250604,0.0029466292,0.0018773424,0.000580587],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006908435,0.0012874999,0.032299947,0.0036393353,0.00013650775,0.0021521375,0.17043412,0.06774412,0.033338856,0.3660789,0.0058770496,0.31632072],"study_design_scores_gemma":[0.00034008114,0.0014617105,0.03891846,0.007591834,0.00037495108,0.0020324872,0.21818188,0.23155457,0.03931345,0.3109016,0.14883532,0.00049365655],"about_ca_topic_score_codex":0.0044600535,"about_ca_topic_score_gemma":0.005848766,"teacher_disagreement_score":0.021933688,"about_ca_system_score_codex":0.004627442,"about_ca_system_score_gemma":0.009905633,"threshold_uncertainty_score":0.11599785},"labels":[],"label_agreement":null},{"id":"W4366088320","doi":"10.3390/buildings13041050","title":"Developing a Construction-Oriented DfMA Deployment Framework","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Polytechnique Montréal; Université du Québec à Montréal","funders":"Fonds de recherche du Québec – Nature et technologies; National Research Council Canada; Polytechnique Montréal","keywords":"Context (archaeology); Construction industry; Engineering; Software deployment; Quality function deployment; Engineering management; Construction management; Systematic review; Process management; Computer science; Management science; Systems engineering; Construction engineering; Software engineering; Operations management; Civil engineering","score_opus":0.012566957154588061,"score_gpt":0.23626416641289644,"score_spread":0.22369720925830838,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366088320","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003776066,0.00062114175,0.9698158,0.0018636013,0.00006589475,0.000780599,0.00030088203,0.000879548,0.021896424],"genre_scores_gemma":[0.041090515,0.0006610387,0.9536509,0.00016041318,0.000024282692,0.0009376404,0.0007138758,0.0001534131,0.0026079842],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99291706,0.003320089,0.00078221655,0.0007751454,0.0016524249,0.00055306824],"domain_scores_gemma":[0.991829,0.004152254,0.00064828014,0.00104834,0.0018892736,0.00043278377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015492939,0.0013254529,0.00065645354,0.0071849218,0.0021958004,0.0068304897,0.003648281,0.0031000434,0.005292945],"category_scores_gemma":[0.013867353,0.0014867223,0.0018504779,0.004075832,0.0034572526,0.0076909726,0.0065315254,0.0032795116,0.0023158258],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026075053,0.00013913399,0.0026239166,0.0008514305,0.00005034574,0.00050683034,0.0065789125,0.027839625,0.0021356598,0.8469252,0.0056302967,0.106692545],"study_design_scores_gemma":[0.000043381275,0.00010846059,0.0018670855,0.0027494377,0.00008033685,0.00097131653,0.006389693,0.14901587,0.0025031432,0.32196417,0.51417553,0.00013157456],"about_ca_topic_score_codex":0.012021393,"about_ca_topic_score_gemma":0.01649444,"teacher_disagreement_score":0.015492939,"about_ca_system_score_codex":0.0044417833,"about_ca_system_score_gemma":0.008631463,"threshold_uncertainty_score":0.081935525},"labels":[],"label_agreement":null},{"id":"W4366492345","doi":"10.11159/icsect23.114","title":"Risk Analysis of Yard Stock Layout Management for InSitu Production of Steel-Connected Precast Concrete Members","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Education, India; National Research Foundation of Korea; National Research Foundation","keywords":"Precast concrete; Yard; Stock (firearms); Production (economics); Computer science; Engineering; Civil engineering; Mechanical engineering","score_opus":0.005878882801282305,"score_gpt":0.18721492650426313,"score_spread":0.18133604370298084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366492345","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.873847,0.0006942815,0.119639196,0.00024998924,0.000029840843,0.00023824448,0.00057298964,0.0002900869,0.004438552],"genre_scores_gemma":[0.9842046,0.00023475416,0.013725421,0.000011060151,0.0000074386885,0.000056995937,0.00032645333,0.00002250003,0.001410828],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9965031,0.0008480774,0.00018240644,0.000469718,0.0015835939,0.00041306752],"domain_scores_gemma":[0.99274594,0.0031401962,0.0021243559,0.00041612488,0.0013110564,0.0002623308],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044095544,0.0012267593,0.00064091955,0.003326762,0.0005817999,0.0017476487,0.0013980577,0.001042323,0.0018297466],"category_scores_gemma":[0.006603546,0.0006267435,0.0013994743,0.0012089164,0.0007286741,0.0017218089,0.0014409113,0.0006794413,0.00024874206],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00068722665,0.0003111674,0.16683523,0.00029452672,0.00040838204,0.0017091047,0.0008078103,0.746684,0.01083799,0.008875645,0.001428432,0.06112052],"study_design_scores_gemma":[0.000017470174,0.00061484374,0.066682786,0.00005966967,0.00026389988,0.00073370495,0.0010229573,0.91747123,0.008076225,0.003917731,0.0010476134,0.000091792965],"about_ca_topic_score_codex":0.006276076,"about_ca_topic_score_gemma":0.005379835,"teacher_disagreement_score":0.006276076,"about_ca_system_score_codex":0.002323367,"about_ca_system_score_gemma":0.0013743954,"threshold_uncertainty_score":0.023320198},"labels":[],"label_agreement":null},{"id":"W4366502783","doi":"10.11159/icsect23.109","title":"A Systematic Methodology for Prioritizing Seismic Retrofit Alternatives","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"United Arab Emirates University","keywords":"Computer science; Construction engineering; Engineering","score_opus":0.014047860051701543,"score_gpt":0.22373944811160967,"score_spread":0.20969158805990812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366502783","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026560216,0.00018246869,0.9921693,0.00017018791,0.000015242099,0.0007839144,0.00014101595,0.00039399296,0.0034878189],"genre_scores_gemma":[0.017340947,0.0001464815,0.98135054,0.000032005497,0.000009272777,0.00039783656,0.00019039509,0.00004552067,0.00048685737],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9918733,0.0030166244,0.0006973872,0.00073865795,0.0033719135,0.00030219756],"domain_scores_gemma":[0.99202347,0.0036088163,0.0008143342,0.0005539049,0.0028155078,0.00018401696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008319189,0.0028083378,0.0016688196,0.008463043,0.0015805245,0.0042474396,0.002707734,0.0012052297,0.006826263],"category_scores_gemma":[0.014856501,0.0012489983,0.001966638,0.0034286021,0.0015546852,0.0024539267,0.0025696957,0.00195529,0.0014065392],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007932088,0.00047351993,0.0030351628,0.0016148601,0.00030086248,0.0005195555,0.0009692908,0.16772403,0.012662538,0.121459074,0.0051265555,0.6860352],"study_design_scores_gemma":[0.00015822184,0.0005984633,0.0019242738,0.0015331035,0.0003050152,0.0007621894,0.0018478093,0.7268956,0.016239215,0.19111434,0.058426257,0.00019565944],"about_ca_topic_score_codex":0.0042478894,"about_ca_topic_score_gemma":0.009186027,"teacher_disagreement_score":0.008463043,"about_ca_system_score_codex":0.0026108713,"about_ca_system_score_gemma":0.008879236,"threshold_uncertainty_score":0.043996572},"labels":[],"label_agreement":null},{"id":"W4366506687","doi":"10.11159/icsect23.125","title":"Optimization of a Waffle Slab for a Reinforced Concrete Structure. Economic and Environmental Comparison","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Slab; Reinforced concrete; Computer science; Structural engineering; Engineering","score_opus":0.004992269206092888,"score_gpt":0.18296680311527558,"score_spread":0.1779745339091827,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366506687","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8074333,0.000714683,0.15310788,0.00012075064,0.000044462875,0.00023114416,0.0007929219,0.00035545108,0.037199367],"genre_scores_gemma":[0.9324823,0.000303366,0.06130979,0.000010047264,0.0000046395276,0.00009133916,0.00036151859,0.000078147015,0.005358859],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996283,0.00007885042,0.000010043404,0.0000362918,0.0001884219,0.000058108948],"domain_scores_gemma":[0.9997161,0.00009154069,0.00005085934,0.00004074824,0.0000761191,0.000024511664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004677017,0.00091598416,0.00051899976,0.0010903002,0.00027611235,0.00084258494,0.00046355597,0.00072667765,0.0060394183],"category_scores_gemma":[0.0008524181,0.0003228176,0.0008673741,0.00061661977,0.00028788176,0.00039449043,0.00043052732,0.0004116391,0.0008587226],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001840443,0.00010519874,0.0015448533,0.00021799514,0.0000362618,0.00016518547,0.0000356826,0.9101277,0.043297354,0.001895543,0.00035510465,0.042035107],"study_design_scores_gemma":[0.000051642484,0.0017796967,0.008393006,0.000071928196,0.00010343603,0.0003710855,0.00022220955,0.942256,0.037545316,0.0020041896,0.007159607,0.000041947103],"about_ca_topic_score_codex":0.0024000132,"about_ca_topic_score_gemma":0.0057060295,"teacher_disagreement_score":0.0060394183,"about_ca_system_score_codex":0.0006795893,"about_ca_system_score_gemma":0.0006296806,"threshold_uncertainty_score":0.020203829},"labels":[],"label_agreement":null},{"id":"W4366506758","doi":"10.11159/icgre23.123","title":"BIM and Tunnelling – a Norwegian application: the Sotra Link Project","year":2023,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Norwegian; Link (geometry); Quantum tunnelling; Computer science; Systems engineering; Engineering; Physics; Computer network; Optoelectronics","score_opus":0.005940201048052681,"score_gpt":0.18601696462170314,"score_spread":0.18007676357365046,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366506758","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54026407,0.0029321446,0.23983034,0.0028057597,0.0005767249,0.0010976557,0.021569801,0.012097007,0.17882656],"genre_scores_gemma":[0.62594634,0.0032413914,0.31547296,0.0001839453,0.00006278186,0.00062054995,0.02251826,0.0023602147,0.029593589],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9986682,0.00039190333,0.00007394074,0.00014388391,0.0006240926,0.00009798565],"domain_scores_gemma":[0.99923635,0.00024660298,0.00004074403,0.00013573226,0.00024715936,0.00009339058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028583019,0.00055992673,0.00032289268,0.0010018054,0.0006744646,0.0014972115,0.00069898006,0.00083993195,0.0044153105],"category_scores_gemma":[0.0021521582,0.0003301924,0.0005006407,0.0019470342,0.000653236,0.0009422653,0.0017022946,0.000488817,0.0010916174],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009571535,0.0014166055,0.025608214,0.0014075554,0.00009206373,0.0042806393,0.008292896,0.25219414,0.02256053,0.0489886,0.073757045,0.56044465],"study_design_scores_gemma":[0.0002885396,0.00053391996,0.040443294,0.00081792957,0.00007845843,0.0017205537,0.006237908,0.36345246,0.017099457,0.016004827,0.5530775,0.00024516217],"about_ca_topic_score_codex":0.033558786,"about_ca_topic_score_gemma":0.03691937,"teacher_disagreement_score":0.033558786,"about_ca_system_score_codex":0.000892932,"about_ca_system_score_gemma":0.0022732886,"threshold_uncertainty_score":0.06672692},"labels":[],"label_agreement":null},{"id":"W4366595889","doi":"10.11159/csee23","title":"Proceedings of the 8th World Congress on Civil, Structural, and Environmental Engineering","year":2023,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"National Water Research Institute","keywords":"Engineering; Computer science; Political science; Engineering ethics; Environmental ethics; Civil engineering; Philosophy","score_opus":0.005610067189781912,"score_gpt":0.18390953468720064,"score_spread":0.17829946749741873,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366595889","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025087572,0.013654701,0.004479728,0.016987927,0.06619719,0.0002751939,0.0028548462,0.00043776433,0.8926039],"genre_scores_gemma":[0.0041530225,0.0045156907,0.0011087689,0.00091059704,0.0026841997,0.00010999038,0.0017305632,0.00018791841,0.98459923],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991518,0.00013611639,0.00003580091,0.00009118825,0.00048446044,0.00010062566],"domain_scores_gemma":[0.9989279,0.00014539705,0.000044950673,0.00007300655,0.0005575127,0.00025129307],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001465512,0.0011153325,0.0006612568,0.0013001227,0.0013134754,0.0056449296,0.0007569235,0.0015366034,0.24238765],"category_scores_gemma":[0.0015454671,0.00017619239,0.00040302295,0.0011091004,0.00068061595,0.0024479143,0.0019135944,0.0025031916,0.113127],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030349536,0.00003474157,0.000110572444,0.00009803362,0.0000031105471,0.000035084915,0.00003961634,0.00010334802,0.0002749164,0.0031667606,0.95125544,0.044848092],"study_design_scores_gemma":[0.000002007919,0.000006995986,0.00028996516,0.000056897446,0.0000010938095,0.000021446256,0.000040971023,0.000075437485,0.000093403105,0.00050760794,0.9989015,0.0000026981525],"about_ca_topic_score_codex":0.0027150188,"about_ca_topic_score_gemma":0.00830397,"teacher_disagreement_score":0.75761235,"about_ca_system_score_codex":0.0014097798,"about_ca_system_score_gemma":0.0026299586,"threshold_uncertainty_score":0.8108675},"labels":[],"label_agreement":null},{"id":"W4366808596","doi":"10.5267/j.jpm.2023.4.001","title":"The time-cost trade-off problem and its extensions: A state-of-the-art survey and outlook","year":2023,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Heuristics; Computer science; Probabilistic logic; Operations research; Variety (cybernetics); Range (aeronautics); Scheduling (production processes); Table (database); Mathematical optimization; Total cost; Industrial engineering; Management science; Data mining; Mathematics; Artificial intelligence; Engineering","score_opus":0.016106731645807417,"score_gpt":0.23659227085878468,"score_spread":0.22048553921297726,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4366808596","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041779913,0.9413634,0.037236094,0.0014720133,0.00046265268,0.000041103784,0.00011004087,0.00008015659,0.015056526],"genre_scores_gemma":[0.03556642,0.93182456,0.027429024,0.00040072433,0.0014942028,0.00007217569,0.0002868817,0.000052533225,0.0028735353],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.998654,0.0003122888,0.00013546518,0.00034174338,0.00043335443,0.00012306598],"domain_scores_gemma":[0.9947155,0.0040215347,0.00029361487,0.00015099102,0.000717052,0.00010126699],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025878795,0.0015024794,0.001575254,0.00354728,0.00072592654,0.0044734864,0.001653776,0.0019411212,0.004588568],"category_scores_gemma":[0.0045425612,0.0008786371,0.0016531235,0.008947696,0.0010541476,0.0055925553,0.0011835317,0.002094006,0.0014285853],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009777886,0.00025106958,0.0025894297,0.010953518,0.00013758765,0.00025876757,0.00031961375,0.024447154,0.0007989673,0.07796094,0.015643036,0.8665422],"study_design_scores_gemma":[0.000031873293,0.00060331554,0.008289401,0.0124218995,0.0005319399,0.0027547206,0.00279589,0.10659544,0.0024825172,0.18704253,0.6761066,0.000343847],"about_ca_topic_score_codex":0.003905439,"about_ca_topic_score_gemma":0.0026575893,"teacher_disagreement_score":0.004588568,"about_ca_system_score_codex":0.0014101557,"about_ca_system_score_gemma":0.0021482797,"threshold_uncertainty_score":0.015350282},"labels":[],"label_agreement":null},{"id":"W4367317952","doi":"10.18280/mmep.100212","title":"Evaluation of Construction Project’s Cost Using BIM Technology","year":2023,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction engineering; Engineering; Building information modeling; Architectural engineering; Systems engineering; Computer science; Operations management","score_opus":0.0677439223874451,"score_gpt":0.2610895634976526,"score_spread":0.19334564111020752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367317952","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8349202,0.0010292808,0.12336631,0.00026014665,0.00007164603,0.00057848694,0.0012858663,0.00028891914,0.0381991],"genre_scores_gemma":[0.9281136,0.0006387343,0.06702401,0.000014150682,0.000012051037,0.0003485007,0.0008746827,0.00005072254,0.0029235594],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9918469,0.0027407245,0.00044523826,0.00028819125,0.0043651583,0.00031367797],"domain_scores_gemma":[0.9926292,0.0033417644,0.0009483134,0.00049567636,0.0024320155,0.00015297763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004339888,0.000871462,0.00061289035,0.007504015,0.0005532367,0.0017539181,0.00080386375,0.00050482125,0.0027715995],"category_scores_gemma":[0.012508992,0.00032455867,0.00050748343,0.006217169,0.00041081055,0.0019713917,0.0009703767,0.00027705057,0.00067510287],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007727556,0.000616505,0.20155351,0.0012969904,0.00020354408,0.0011632969,0.0018635687,0.1106621,0.011174793,0.018360639,0.0043983078,0.647934],"study_design_scores_gemma":[0.000051506053,0.0020041806,0.48787615,0.0005676069,0.0002948457,0.002165511,0.010927088,0.43259493,0.02467221,0.005940889,0.03264175,0.00026331228],"about_ca_topic_score_codex":0.0025810823,"about_ca_topic_score_gemma":0.005258405,"teacher_disagreement_score":0.007504015,"about_ca_system_score_codex":0.0013754383,"about_ca_system_score_gemma":0.0011856332,"threshold_uncertainty_score":0.022951782},"labels":[],"label_agreement":null},{"id":"W4367553863","doi":"10.1061/9780784484777.032","title":"Using Dimensional Control to Mitigate Risk for Pre-Assembled Units/Piperacks Installation","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Dow Chemical (Canada); Intertek (Canada)","funders":"","keywords":"Rework; Schedule; Computer science; Control (management); Systems engineering; Interface (matter); Reliability engineering; Risk analysis (engineering); Construction engineering; Engineering; Embedded system","score_opus":0.021469314530175764,"score_gpt":0.2603658607842072,"score_spread":0.23889654625403145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4367553863","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13835448,0.00091535377,0.8025421,0.0016705852,0.0006136797,0.0010651546,0.00028018758,0.007965775,0.04659272],"genre_scores_gemma":[0.548323,0.0004646148,0.43670896,0.0004945341,0.000095538235,0.00061384746,0.00028663795,0.0008332401,0.0121796],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98751974,0.0023636613,0.000783222,0.0009214773,0.0079042865,0.0005076022],"domain_scores_gemma":[0.974911,0.0062540662,0.0040090047,0.006289391,0.008095112,0.0004414795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009135983,0.0014359362,0.00058879424,0.0033403167,0.0017361069,0.0027936646,0.002199802,0.0010777679,0.0077423374],"category_scores_gemma":[0.034441732,0.0008540872,0.00043441635,0.0016394898,0.0012749437,0.002952457,0.003493717,0.001635145,0.0021266423],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040709384,0.00040392316,0.054850142,0.0008465264,0.00006385436,0.00096026063,0.007788117,0.029502844,0.06342527,0.015583902,0.020479787,0.80568826],"study_design_scores_gemma":[0.00014977448,0.0037471915,0.16457066,0.0017043981,0.00032315444,0.0050289533,0.0145582855,0.1756195,0.22464311,0.024006179,0.38487568,0.0007731107],"about_ca_topic_score_codex":0.00313631,"about_ca_topic_score_gemma":0.006920823,"teacher_disagreement_score":0.009135983,"about_ca_system_score_codex":0.0011831338,"about_ca_system_score_gemma":0.0024379522,"threshold_uncertainty_score":0.04831624},"labels":[],"label_agreement":null},{"id":"W4372311861","doi":"10.1016/j.jobe.2023.106780","title":"BIM and LCA integration methodologies: A critical analysis and proposed guidelines","year":2023,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":43,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Fundação de Amparo à Pesquisa e Inovação do Espírito Santo","keywords":"Building information modeling; Standardization; Context (archaeology); Best practice; Life-cycle assessment; Process (computing); Systematic review; Construction industry; Environmental impact assessment; Process management; Computer science; Engineering; Risk analysis (engineering); Management science; Construction engineering; Production (economics); Business; Operations management; MEDLINE","score_opus":0.051160412977094755,"score_gpt":0.33472480993366527,"score_spread":0.28356439695657054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4372311861","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041824296,0.08283709,0.6721181,0.08419312,0.0021370207,0.007309847,0.00079963525,0.000859659,0.10792125],"genre_scores_gemma":[0.1613287,0.015350802,0.81106704,0.0030178432,0.0003532945,0.0026215066,0.00035506274,0.00019989412,0.005705872],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9505565,0.02261753,0.005116558,0.0018780219,0.018500727,0.001330653],"domain_scores_gemma":[0.8736584,0.058770183,0.005056949,0.0044557075,0.056612346,0.0014464131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06717913,0.001966842,0.0013131903,0.015943374,0.0040424084,0.015486075,0.004527647,0.003807184,0.0040030433],"category_scores_gemma":[0.08103448,0.0015261997,0.0011318582,0.008768223,0.0071859565,0.014155428,0.0050111543,0.004764665,0.0011373352],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021841106,0.0004983102,0.009081643,0.002905236,0.00016709042,0.00062528334,0.007764638,0.0041913115,0.0045532566,0.48380524,0.016946914,0.46924263],"study_design_scores_gemma":[0.0001640736,0.0005662686,0.014403793,0.025646487,0.00075827696,0.0018469006,0.032060623,0.051037863,0.016965995,0.47767645,0.37838903,0.00048422124],"about_ca_topic_score_codex":0.011743051,"about_ca_topic_score_gemma":0.0152333,"teacher_disagreement_score":0.06717913,"about_ca_system_score_codex":0.012593282,"about_ca_system_score_gemma":0.022667885,"threshold_uncertainty_score":0.3552814},"labels":[],"label_agreement":null},{"id":"W4372403996","doi":"10.1155/2023/1058063","title":"Application of System Dynamics in Construction Engineering and Management: Content Analysis and Systematic Literature Review","year":2023,"lang":"en","type":"article","venue":"Advances in Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada First Research Excellence Fund","keywords":"Systematic review; Content analysis; Computer science; Dynamism; Abstraction; Management science; Data science; Domain (mathematical analysis); Engineering; MEDLINE; Sociology","score_opus":0.0035662357158555117,"score_gpt":0.1956973953945726,"score_spread":0.19213115967871708,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4372403996","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.032069083,0.89530313,0.02095232,0.005852611,0.0010464751,0.032768104,0.005462318,0.00014982982,0.0063961353],"genre_scores_gemma":[0.18577905,0.7049618,0.05728302,0.0030964832,0.00033946338,0.044679407,0.002884872,0.000083204315,0.0008928262],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.89783084,0.047871623,0.028736817,0.0038843553,0.020182783,0.0014934519],"domain_scores_gemma":[0.679826,0.25132504,0.022583317,0.0059899236,0.038973648,0.0013020891],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.09500882,0.0017289962,0.0062602777,0.07055819,0.0025178792,0.006665256,0.0027311617,0.002894841,0.0029561003],"category_scores_gemma":[0.2457169,0.0018501398,0.0053299046,0.045252062,0.0038033233,0.0075541553,0.005412085,0.0016966955,0.00045986712],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001113705,0.00013691778,0.006464551,0.7807415,0.0029325194,0.00049496675,0.011442146,0.0012700867,0.0006273681,0.006326376,0.0053745788,0.18407764],"study_design_scores_gemma":[0.00014265261,0.00033619272,0.009864767,0.906713,0.009826293,0.0004715496,0.014785365,0.0012520509,0.00095919915,0.004421487,0.05108554,0.00014181691],"about_ca_topic_score_codex":0.013006103,"about_ca_topic_score_gemma":0.02142384,"teacher_disagreement_score":0.09500882,"about_ca_system_score_codex":0.019789284,"about_ca_system_score_gemma":0.08251957,"threshold_uncertainty_score":0.50246066},"labels":[],"label_agreement":null},{"id":"W4375867750","doi":"10.1061/jcemd4.coeng-13427","title":"Functionality as a Key Concept for Integrated Project Planning and Scheduling Methods","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Computer science; Scheduling (production processes); Two-level scheduling; Automated planning and scheduling; Planner; Dynamic priority scheduling; Industrial engineering; Systems engineering; Schedule; Engineering; Operations management; Artificial intelligence","score_opus":0.01921588944281504,"score_gpt":0.28996288417762717,"score_spread":0.2707469947348121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4375867750","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013202409,0.00031410804,0.9703611,0.0005136505,0.00007063318,0.00020178841,0.00005649452,0.00019005503,0.015089844],"genre_scores_gemma":[0.23708417,0.00041919434,0.7591633,0.00014327015,0.000066542416,0.0005723542,0.00016978674,0.00009716774,0.002284313],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.992277,0.004093615,0.000713132,0.00068375585,0.00192526,0.00030709428],"domain_scores_gemma":[0.99251395,0.0041215164,0.0007920896,0.0010995639,0.0011649504,0.00030791815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073681967,0.00104489,0.00036140755,0.0031568108,0.0011164832,0.003743567,0.001448943,0.0009568941,0.0025270153],"category_scores_gemma":[0.009467451,0.000499051,0.001385379,0.0021122543,0.003912052,0.0051707793,0.0026172642,0.0018368039,0.0005463257],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065846114,0.00010655455,0.0033139554,0.0006222967,0.00007252626,0.0001599555,0.0040636356,0.015117068,0.004983031,0.79035705,0.0011041382,0.18003385],"study_design_scores_gemma":[0.00007547419,0.0008926771,0.0076372665,0.0015920262,0.00025727274,0.001188962,0.004961846,0.13804609,0.014239532,0.6666892,0.16425714,0.00016245575],"about_ca_topic_score_codex":0.0012706601,"about_ca_topic_score_gemma":0.0010156895,"teacher_disagreement_score":0.0073681967,"about_ca_system_score_codex":0.001543331,"about_ca_system_score_gemma":0.0034862908,"threshold_uncertainty_score":0.038967192},"labels":[],"label_agreement":null},{"id":"W4376278966","doi":"10.3389/fbuil.2023.1117066","title":"BIM for FM: understanding information quality issues in terms of compliance with owner’s Building Information Modeling Requirements","year":2023,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada; Fraser Health Authority","keywords":"Building information modeling; Enabling; Facility management; Process management; Information model; Information quality; Knowledge management; Computer science; Process (computing); Information system; Engineering; Risk analysis (engineering); Operations management; Database; Business; Psychology","score_opus":0.06524627948883693,"score_gpt":0.27719875872802696,"score_spread":0.21195247923919003,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4376278966","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3845371,0.0012716454,0.49881512,0.012910816,0.000100329795,0.0015586262,0.000641707,0.00055539137,0.099609196],"genre_scores_gemma":[0.86547107,0.00050074543,0.13105388,0.00039500638,0.000029659315,0.00059481466,0.00042873263,0.000083365456,0.0014427893],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.92222637,0.038141895,0.0074946503,0.002702885,0.026760306,0.0026738679],"domain_scores_gemma":[0.8409519,0.10749295,0.0173112,0.012093088,0.021030804,0.0011200453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.071157455,0.00080541795,0.0007293115,0.007326491,0.0027129813,0.010539514,0.0029398245,0.0026252572,0.0022161093],"category_scores_gemma":[0.15400276,0.0008879585,0.0007752166,0.008777951,0.008316679,0.016933318,0.0058995164,0.002267238,0.00038593353],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001944529,0.0006461157,0.06847298,0.0028361946,0.00011285993,0.0013376565,0.16436985,0.023964662,0.006426035,0.47213602,0.004876472,0.25462672],"study_design_scores_gemma":[0.0001236392,0.0010867034,0.09278575,0.004649071,0.00024109187,0.0036883822,0.22669281,0.14069724,0.018061494,0.32477707,0.18681204,0.00038468654],"about_ca_topic_score_codex":0.0072745145,"about_ca_topic_score_gemma":0.0036916744,"teacher_disagreement_score":0.071157455,"about_ca_system_score_codex":0.0075037307,"about_ca_system_score_gemma":0.011217877,"threshold_uncertainty_score":0.37632108},"labels":[],"label_agreement":null},{"id":"W4377826098","doi":"10.1007/s41062-023-01141-6","title":"Building information modeling (BIM)-based model checking to ensure occupant safety in institutional buildings","year":2023,"lang":"en","type":"article","venue":"Innovative Infrastructure Solutions","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Set (abstract data type); Engineering; Construction engineering; Architectural engineering; Building design; Building code; Information model; Built environment; Transport engineering; Computer science; Risk analysis (engineering); Civil engineering; Software engineering; Business; Operations management","score_opus":0.018319514384764143,"score_gpt":0.24843693068756456,"score_spread":0.23011741630280041,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377826098","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15822956,0.00020786627,0.83059543,0.000298507,0.00007341465,0.00017188895,0.00040408375,0.00549173,0.0045274682],"genre_scores_gemma":[0.86175746,0.00010029332,0.1358975,0.0001048776,0.000009626032,0.00011037675,0.00064565043,0.00027079246,0.0011034629],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99504745,0.0019602682,0.00020427306,0.000440505,0.0018185802,0.00052901346],"domain_scores_gemma":[0.99391127,0.0030485578,0.00051252235,0.0014591103,0.0009163182,0.00015216638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038832866,0.0009596513,0.0008804519,0.0012255885,0.00073790277,0.0020704356,0.0023110216,0.0010764545,0.002169511],"category_scores_gemma":[0.012241448,0.00082601956,0.0015022848,0.0007695547,0.001551485,0.002881552,0.0032834918,0.0015031399,0.0004152461],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035309285,0.0002915031,0.008135744,0.00019606572,0.00014125128,0.00020716013,0.00035730968,0.8990132,0.0101651335,0.027177973,0.0018111175,0.05215036],"study_design_scores_gemma":[0.000011699038,0.000034909957,0.0003371682,0.000014404314,0.000021999635,0.000019220766,0.000041508505,0.98926896,0.004953921,0.0047791563,0.0005097666,0.0000073159267],"about_ca_topic_score_codex":0.0182686,"about_ca_topic_score_gemma":0.023518251,"teacher_disagreement_score":0.0182686,"about_ca_system_score_codex":0.0014418296,"about_ca_system_score_gemma":0.0045752083,"threshold_uncertainty_score":0.0363245},"labels":[],"label_agreement":null},{"id":"W4377982347","doi":"10.54729/2789-8547.1227","title":"DEVELOPING A DESIGN FRAMEWORK FOR THE MASS CUSTOMISATION OF HOUSING IN SAUDI ARABIA - A CRITICAL REVIEW","year":2023,"lang":"en","type":"review","venue":"Architecture and Planning Journal (APJ)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"ASTER","funders":"McGill University; Harvard Business School","keywords":"Workflow; Context (archaeology); Scopus; Engineering; Computer science; Chart; Engineering management; Systems engineering; Geography; Database; Political science; MEDLINE; Mathematics","score_opus":0.10596800390616039,"score_gpt":0.35072175881983814,"score_spread":0.24475375491367773,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4377982347","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0011117251,0.98732984,0.003387356,0.0033486346,0.00048453631,0.000301129,0.000091578186,0.000017863154,0.0039273715],"genre_scores_gemma":[0.018353036,0.964887,0.01388194,0.0012109099,0.00018250712,0.00036682343,0.00013614925,0.000009066482,0.0009725649],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99620664,0.0015042132,0.0008103138,0.00027612294,0.0010433053,0.00015948266],"domain_scores_gemma":[0.9894581,0.0062626023,0.0010753927,0.00017664547,0.0028821367,0.000145085],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011425952,0.001302034,0.00144013,0.015457942,0.0010744311,0.004907508,0.0017832376,0.0020080388,0.0026892652],"category_scores_gemma":[0.0131409895,0.0005497841,0.0014402748,0.009502524,0.0016724588,0.005035891,0.0020984835,0.0015873308,0.0005820231],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006840225,0.00007474014,0.001275292,0.19606255,0.00044692034,0.0007402317,0.004162922,0.001936547,0.0015454672,0.077696264,0.015269895,0.7007208],"study_design_scores_gemma":[0.000030569372,0.00020181712,0.002902541,0.2035015,0.0013125881,0.0011662288,0.0059227226,0.0008803769,0.0011073827,0.0144939115,0.76839244,0.00008789948],"about_ca_topic_score_codex":0.008848869,"about_ca_topic_score_gemma":0.019113436,"teacher_disagreement_score":0.015457942,"about_ca_system_score_codex":0.0062733795,"about_ca_system_score_gemma":0.020715024,"threshold_uncertainty_score":0.06042695},"labels":[],"label_agreement":null},{"id":"W4378836433","doi":"10.18280/ijsdp.180518","title":"Modelling Design Standards for Iraqi Schools Using Building Information Modeling","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Building information modeling; Computer science; Environmental planning; Civil engineering; Environmental science; Construction engineering; Engineering; Systems engineering; Operations management","score_opus":0.03403824909058557,"score_gpt":0.2725954859099814,"score_spread":0.23855723681939583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4378836433","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020370608,0.00016751084,0.9573928,0.00018915886,0.00003290378,0.00030354518,0.0010860807,0.0013880868,0.019069294],"genre_scores_gemma":[0.17586172,0.0005258232,0.81513405,0.000032753593,0.000011022278,0.00067595823,0.0027624792,0.00024466089,0.00475145],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987105,0.00032452284,0.00015931409,0.00019422252,0.0005254095,0.00008607762],"domain_scores_gemma":[0.999019,0.0003724123,0.00014423071,0.00016467737,0.0002709034,0.000028757255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014677291,0.000923944,0.00048670982,0.0033959101,0.0010084267,0.0036979425,0.0017897314,0.0011414461,0.004804727],"category_scores_gemma":[0.003122118,0.0008741311,0.0017712691,0.003036182,0.0006822596,0.0022879567,0.0018920432,0.0011016263,0.00135896],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035365803,0.00011130016,0.0048304717,0.00043629544,0.000059457816,0.00024808114,0.0018073614,0.7788315,0.0039558224,0.11973756,0.0028518394,0.08709491],"study_design_scores_gemma":[0.000018591656,0.000048354428,0.0020270362,0.00015877261,0.000055913308,0.00017083646,0.0006953247,0.8953177,0.0035063012,0.026420528,0.071516074,0.00006462323],"about_ca_topic_score_codex":0.014928814,"about_ca_topic_score_gemma":0.018645464,"teacher_disagreement_score":0.014928814,"about_ca_system_score_codex":0.0021239987,"about_ca_system_score_gemma":0.0025656852,"threshold_uncertainty_score":0.029683828},"labels":[],"label_agreement":null},{"id":"W4379419119","doi":"10.1061/jcemd4.coeng-12891","title":"Crane Mat Layout Optimization Based on Agent-Based Greedy and Reinforcement-Learning Approach","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement learning; Modular design; Plan (archaeology); Computer science; Industrial engineering; Engineering; Transport engineering; Artificial intelligence","score_opus":0.006032767202855141,"score_gpt":0.17752665299140344,"score_spread":0.1714938857885483,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379419119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04156078,0.00024584922,0.9519189,0.00021336054,0.00003925811,0.000096007665,0.000036647063,0.00045775532,0.0054314733],"genre_scores_gemma":[0.8530863,0.00015380202,0.1425695,0.00012081583,0.0000268658,0.00020082534,0.000070714355,0.000048132533,0.0037232144],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99973375,0.00006774302,0.000010505067,0.00005660752,0.00006792553,0.00006342354],"domain_scores_gemma":[0.9995154,0.0002497286,0.000074366195,0.000024641193,0.00009029867,0.00004551957],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00052629894,0.00073487015,0.0010816441,0.0005067499,0.00039870042,0.00061258173,0.0012890913,0.00093258487,0.0020839432],"category_scores_gemma":[0.001055308,0.0004976094,0.00061323197,0.0003685243,0.0006762784,0.00044432742,0.0007358512,0.00071249827,0.000219549],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016447639,0.000023742243,0.00024410212,0.000017712251,0.000011481217,0.000031804433,0.000013052489,0.98869354,0.0004356798,0.0014909232,0.00021848333,0.0088029895],"study_design_scores_gemma":[0.000004160732,0.000009448867,0.000028862067,0.0000012985818,0.0000022852262,0.000003805499,0.0000023408961,0.99947625,0.00006911247,0.00031403112,0.00008695481,0.0000014179133],"about_ca_topic_score_codex":0.013904438,"about_ca_topic_score_gemma":0.0115250535,"teacher_disagreement_score":0.013904438,"about_ca_system_score_codex":0.00085445144,"about_ca_system_score_gemma":0.0017269161,"threshold_uncertainty_score":0.027647018},"labels":[],"label_agreement":null},{"id":"W4379624712","doi":"10.1016/j.autcon.2023.104952","title":"Operations planning and scheduling in off-site construction supply chain management: Scope definition and future directions","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":45,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Supply chain; Supply chain management; Procurement; Computer science; Scope (computer science); Process management; Integrated business planning; Operations research; Operations management; Systems engineering; Engineering; Business","score_opus":0.00918398281345273,"score_gpt":0.21978350245852346,"score_spread":0.21059951964507073,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379624712","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13346902,0.09287826,0.69082576,0.017118754,0.0005167765,0.00043512668,0.0003949835,0.00061381806,0.063747525],"genre_scores_gemma":[0.7241279,0.05234364,0.2142722,0.00064352393,0.00089645735,0.00017685782,0.0006069052,0.00011395823,0.006818561],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972861,0.0014151275,0.0002000007,0.00034129544,0.0004994516,0.00025804553],"domain_scores_gemma":[0.9900703,0.005658702,0.0009155643,0.00053671066,0.002267243,0.000551536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007225129,0.00080651697,0.0010966611,0.0026385102,0.0007438833,0.0077195163,0.0022307723,0.0016117386,0.0035893468],"category_scores_gemma":[0.0072199763,0.00052180834,0.0006652802,0.007977829,0.001985082,0.0077949543,0.0016164059,0.0009985024,0.00056624494],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025474557,0.00061390136,0.019875368,0.0013196907,0.000100693156,0.00012460702,0.0011804021,0.097114116,0.00208808,0.15731023,0.0041774805,0.71584064],"study_design_scores_gemma":[0.00005603352,0.0004950013,0.016111674,0.0020430062,0.00018015176,0.00031495374,0.010745526,0.60559773,0.004599825,0.26985398,0.08987726,0.0001248676],"about_ca_topic_score_codex":0.015405243,"about_ca_topic_score_gemma":0.010637882,"teacher_disagreement_score":0.015405243,"about_ca_system_score_codex":0.0029941937,"about_ca_system_score_gemma":0.0070117055,"threshold_uncertainty_score":0.03821057},"labels":[],"label_agreement":null},{"id":"W4379798983","doi":"10.3390/buildings13061474","title":"BIM-Based Checking Method for the Mass Timber Industry","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Building information modeling; Process (computing); Audit; Prefabrication; Interview; Engineering; Construction engineering; Factory (object-oriented programming); Computer science; Construction industry; Architectural engineering; Systems engineering; Software engineering; Risk analysis (engineering); Civil engineering; Operations management; Accounting; Business","score_opus":0.021011894904661797,"score_gpt":0.2755194760455381,"score_spread":0.2545075811408763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4379798983","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016180434,0.000024212148,0.992277,0.00003634494,0.000026715428,0.00018030965,0.00014561327,0.0034154276,0.0022762853],"genre_scores_gemma":[0.041708972,0.000059837006,0.9527013,0.00004532735,0.0000132145815,0.0004487528,0.00081774825,0.0009394701,0.0032655431],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.995784,0.00099076,0.0004809942,0.000738693,0.0018159266,0.00018954411],"domain_scores_gemma":[0.9949108,0.0019049434,0.00033738458,0.0010545867,0.0016687227,0.00012353342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004182091,0.0011122688,0.0007643091,0.0042959233,0.0014573782,0.0023985498,0.0021606663,0.001165576,0.01807798],"category_scores_gemma":[0.011613689,0.0008086344,0.0020488142,0.0020790554,0.0009908859,0.0023177906,0.0030021057,0.0016348936,0.004590936],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00039543107,0.00042774485,0.00541551,0.001109627,0.00017204358,0.0014393628,0.004276749,0.076046035,0.03625211,0.1315672,0.022939643,0.71995854],"study_design_scores_gemma":[0.0001382622,0.00016408101,0.002326602,0.00028844332,0.0001664792,0.0012830265,0.0009184807,0.75495523,0.04740849,0.040460084,0.15171458,0.00017628622],"about_ca_topic_score_codex":0.003403358,"about_ca_topic_score_gemma":0.0041666655,"teacher_disagreement_score":0.01807798,"about_ca_system_score_codex":0.00087775174,"about_ca_system_score_gemma":0.003124201,"threshold_uncertainty_score":0.06047684},"labels":[],"label_agreement":null},{"id":"W4380372743","doi":"10.1108/ecam-12-2022-1121","title":"Schedule compression and emerging waste in construction: an assessment of overlapping activities","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Schedule; Compression (physics); Computer science; Operations management; Engineering","score_opus":0.006656517620452095,"score_gpt":0.2399072260888694,"score_spread":0.2332507084684173,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380372743","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9531199,0.00028594912,0.042489544,0.00009953434,0.000010826242,0.00014389538,0.00011316828,0.000056567602,0.003680789],"genre_scores_gemma":[0.9873645,0.0001409625,0.01195665,0.000007034366,0.0000021674057,0.000044427325,0.00005850369,0.000013777467,0.00041210902],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9977729,0.0008844022,0.00010824978,0.00013584015,0.00095090666,0.00014762813],"domain_scores_gemma":[0.9875114,0.0076745567,0.002408849,0.0006521183,0.0015139903,0.00023915795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029072284,0.00044698638,0.00033347518,0.0015211471,0.00051099673,0.0012317308,0.0006295558,0.0004362558,0.001744242],"category_scores_gemma":[0.01083873,0.00030426847,0.0005766194,0.0015751543,0.0009117802,0.0010407561,0.0009738263,0.0005296877,0.00010232151],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067730865,0.0003143455,0.11266654,0.00043279267,0.00014207333,0.00062782766,0.0010717402,0.7689849,0.0068324646,0.010938033,0.0003674083,0.096944556],"study_design_scores_gemma":[0.000057010573,0.00311725,0.09625279,0.00023814403,0.00027697708,0.00055006956,0.003371567,0.8602245,0.017348897,0.014200359,0.0042687836,0.00009374452],"about_ca_topic_score_codex":0.00526422,"about_ca_topic_score_gemma":0.0076838876,"teacher_disagreement_score":0.00526422,"about_ca_system_score_codex":0.0019734935,"about_ca_system_score_gemma":0.0016669957,"threshold_uncertainty_score":0.015375078},"labels":[],"label_agreement":null},{"id":"W4380761118","doi":"10.52842/conf.caadria.2023.2.401","title":"Annotation on Interactive Design Data in Design Analytics Tools","year":2023,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Computer-Aided Architectural Design Research in Asia","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Analytics; Annotation; Data science; Visual analytics; Data analysis; Human–computer interaction; Artificial intelligence; Data mining; Visualization","score_opus":0.29582616041530807,"score_gpt":0.3757933936378712,"score_spread":0.0799672332225631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380761118","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029281333,0.0005387358,0.92440975,0.0018042543,0.00020330718,0.00076903804,0.003419031,0.01218204,0.02739253],"genre_scores_gemma":[0.22261187,0.0004853212,0.7588101,0.000507217,0.00008178825,0.001960316,0.0053600366,0.0030614021,0.0071219495],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.971162,0.01940449,0.0017104793,0.0023835984,0.004820519,0.0005189201],"domain_scores_gemma":[0.8688824,0.10147044,0.003151905,0.02012085,0.0054697855,0.0009046305],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021508887,0.0025088869,0.0015673132,0.0078329025,0.0028438496,0.008720584,0.003883735,0.0027319111,0.011751233],"category_scores_gemma":[0.07898921,0.0014382333,0.0018739143,0.006618173,0.0039555556,0.0117415795,0.010093683,0.0031015584,0.0031505434],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013728138,0.00091342255,0.009151826,0.0056362553,0.00031200759,0.0023652464,0.19157854,0.035527486,0.041824706,0.16153611,0.03992105,0.50986046],"study_design_scores_gemma":[0.0002958167,0.0004051823,0.004414395,0.0035582515,0.00022540137,0.00096975605,0.01989763,0.08975283,0.03536803,0.35120717,0.49341032,0.0004952495],"about_ca_topic_score_codex":0.0023630373,"about_ca_topic_score_gemma":0.00474413,"teacher_disagreement_score":0.021508887,"about_ca_system_score_codex":0.0021374677,"about_ca_system_score_gemma":0.003057686,"threshold_uncertainty_score":0.11375123},"labels":[],"label_agreement":null},{"id":"W4380929354","doi":"10.1016/j.autcon.2023.104980","title":"Computer vision applications in offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":62,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Alberta Innovates","keywords":"Field (mathematics); Computer science; Computer technology; Machine vision; Point (geometry); Computer Applications; Risk analysis (engineering); Engineering management; Engineering; Systems engineering; Artificial intelligence; Multimedia","score_opus":0.0059844435924937805,"score_gpt":0.22620193324628818,"score_spread":0.2202174896537944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380929354","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11436343,0.0155512225,0.7705565,0.0027041389,0.00096445886,0.00015681543,0.0002650205,0.0027859227,0.092652515],"genre_scores_gemma":[0.7623356,0.008404697,0.20219773,0.00059108663,0.00033288187,0.000050544917,0.0004164009,0.00023224179,0.025438838],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993554,0.00021928323,0.000027581806,0.00011594591,0.00020488215,0.00007679558],"domain_scores_gemma":[0.99894506,0.00037381207,0.000048271733,0.0001139338,0.00044018886,0.000078890065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007451014,0.00052431464,0.0005800309,0.002525553,0.00056886126,0.0022571706,0.00089659204,0.0015350897,0.006562875],"category_scores_gemma":[0.001988256,0.00035822194,0.0005693747,0.0028445323,0.00062964275,0.00096950255,0.0009183611,0.0008380708,0.0017557497],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001165169,0.0003159447,0.0039969576,0.00034852696,0.00004689851,0.00042073385,0.0004878997,0.027416397,0.018946897,0.02238945,0.013201584,0.91231215],"study_design_scores_gemma":[0.000035126934,0.000392542,0.021092022,0.00040099447,0.000120429424,0.002531771,0.0017590936,0.7221093,0.040987216,0.06462155,0.14582807,0.00012192514],"about_ca_topic_score_codex":0.008628831,"about_ca_topic_score_gemma":0.010260521,"teacher_disagreement_score":0.008628831,"about_ca_system_score_codex":0.0007119539,"about_ca_system_score_gemma":0.00083341176,"threshold_uncertainty_score":0.021955073},"labels":[],"label_agreement":null},{"id":"W4380990663","doi":"10.5539/jms.v13n2p29","title":"Modular Coordination—Architectural Design Associated to a BIM Application","year":2023,"lang":"en","type":"article","venue":"Journal of Management and Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Interoperability; Personalization; Systems engineering; Rationalization (economics); Flexibility (engineering); Process management; Computer science; Prefabrication; Process (computing); Manufacturing engineering; Software engineering; Engineering; Engineering management; World Wide Web; Operating system; Civil engineering","score_opus":0.006827844371734187,"score_gpt":0.22169617584327694,"score_spread":0.21486833147154275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4380990663","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022965271,0.0001825332,0.92702925,0.00035322204,0.00007589779,0.0002679686,0.00008277864,0.0014496306,0.047593523],"genre_scores_gemma":[0.33496034,0.00027935763,0.65269136,0.00010834108,0.000045936493,0.0004049822,0.00021652899,0.00042421016,0.010868949],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975904,0.00092902005,0.00015401459,0.00035268097,0.00072527246,0.00024862515],"domain_scores_gemma":[0.9986588,0.00029622702,0.00014699754,0.0005033464,0.00026270378,0.0001318868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025582972,0.00078574003,0.00033340463,0.0012426084,0.0009756274,0.0034860736,0.0012053354,0.00083100743,0.0051208325],"category_scores_gemma":[0.0028599289,0.00061996334,0.00068703975,0.001112672,0.002129815,0.0020378046,0.0035421483,0.0010924236,0.0018958127],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024252373,0.00015221827,0.0042253225,0.0006068554,0.00007264299,0.0013960883,0.0052319993,0.068386935,0.052572407,0.6812748,0.007153062,0.17868514],"study_design_scores_gemma":[0.00009465592,0.00052805763,0.0063223494,0.00045397636,0.00019866096,0.0031016807,0.0021068028,0.22682512,0.048881967,0.19988503,0.5114327,0.00016901268],"about_ca_topic_score_codex":0.0014706503,"about_ca_topic_score_gemma":0.0011969056,"teacher_disagreement_score":0.0051208325,"about_ca_system_score_codex":0.00087427103,"about_ca_system_score_gemma":0.0018385253,"threshold_uncertainty_score":0.017130911},"labels":[],"label_agreement":null},{"id":"W4381052724","doi":"10.1108/sasbe-01-2023-0006","title":"Modeling relational performance of the supply chains for prefabricated housebuilding in New Zealand","year":2023,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Originality; Supply chain; Sustainability; Quality (philosophy); Prefabrication; Business; Architectural engineering; Marketing; Engineering; Civil engineering; Creativity","score_opus":0.009964841075414387,"score_gpt":0.18513036520791765,"score_spread":0.17516552413250325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4381052724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9709584,0.00032559477,0.01353996,0.00025018744,0.000007573294,0.0002087046,0.0005534483,0.00004761674,0.014108578],"genre_scores_gemma":[0.9929792,0.00035262125,0.0044561927,0.0000053149547,0.0000029777796,0.00007809413,0.0003709517,0.0000071538884,0.0017475807],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995734,0.00013295238,0.000026692971,0.000092705675,0.000097408636,0.000076850134],"domain_scores_gemma":[0.99870694,0.0006605356,0.00026049628,0.00003934845,0.00025893515,0.000073697694],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001239283,0.0005677225,0.00031370408,0.0018491098,0.00065237586,0.0026327355,0.00085297297,0.0004423479,0.0062647914],"category_scores_gemma":[0.004176564,0.00030095302,0.0008231127,0.002349838,0.0007678113,0.0014822629,0.001068294,0.0007156824,0.0003255041],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003514006,0.00063809607,0.38264003,0.0007864229,0.00033840293,0.0017777024,0.011539951,0.4887934,0.0026848866,0.031256564,0.0012768373,0.07791629],"study_design_scores_gemma":[0.000034514655,0.00032249946,0.13787055,0.00020186677,0.0001899371,0.0001353265,0.00935337,0.839198,0.000667135,0.005370577,0.0066154003,0.000040815226],"about_ca_topic_score_codex":0.26342922,"about_ca_topic_score_gemma":0.19304504,"teacher_disagreement_score":0.26342922,"about_ca_system_score_codex":0.0075102933,"about_ca_system_score_gemma":0.004763091,"threshold_uncertainty_score":0.5237918},"labels":[],"label_agreement":null},{"id":"W4382042904","doi":"10.1007/978-3-031-35368-0_6","title":"Innovative Construction Practices","year":2023,"lang":"en","type":"book-chapter","venue":"The urban book series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Prefabrication; Mass customization; Adaptability; Architectural engineering; Demographics; Personalization; Resource (disambiguation); Product (mathematics); Engineering; Resource consumption; Consumption (sociology); Production (economics); Affordable housing; Business; Construction engineering; Computer science; Civil engineering; Marketing; Economics","score_opus":0.01885513633821258,"score_gpt":0.21489844744124895,"score_spread":0.19604331110303636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382042904","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0012954253,0.0013568912,0.00372248,0.00091435254,0.000114849834,0.0000175418,0.000016527047,0.000048432714,0.99251336],"genre_scores_gemma":[0.064719066,0.0035619684,0.0059183836,0.00060692354,0.000096558855,0.000105303276,0.00008334386,0.000110109424,0.9247983],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99888784,0.0002745879,0.0000318935,0.00014088722,0.00053592515,0.00012887166],"domain_scores_gemma":[0.9996711,0.00008021902,0.000020045329,0.00011010756,0.00007342486,0.000045200857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009513643,0.00071595976,0.00029504544,0.0012877488,0.002996056,0.008092214,0.0010066063,0.0014905134,0.045453187],"category_scores_gemma":[0.001238424,0.00032559596,0.0003021818,0.0021418384,0.0054466496,0.003643232,0.0039845137,0.0024611847,0.012463197],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000037087243,0.000027021524,0.00010410193,0.000047778794,0.0000015494153,0.000049336515,0.0048677097,0.00020167696,0.00019625542,0.8837444,0.034512818,0.07624366],"study_design_scores_gemma":[0.0000015773999,0.00000555454,0.00026284222,0.00013067755,0.0000017907162,0.00009147915,0.0021894134,0.00013352309,0.00013433222,0.08137136,0.9156733,0.0000040861687],"about_ca_topic_score_codex":0.0029776872,"about_ca_topic_score_gemma":0.009591443,"teacher_disagreement_score":0.045453187,"about_ca_system_score_codex":0.0037254712,"about_ca_system_score_gemma":0.0031552643,"threshold_uncertainty_score":0.1520561},"labels":[],"label_agreement":null},{"id":"W4382246289","doi":"10.18280/ijsdp.180619","title":"Exploring the Challenges and Opportunities of BIM Implementation in Major Architectural Projects in Iraq","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Building information modeling; Environmental planning; Engineering; Construction engineering; Business; Engineering management; Environmental resource management; Operations management; Environmental science","score_opus":0.09593294253108951,"score_gpt":0.2800778277186633,"score_spread":0.18414488518757377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382246289","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97743666,0.00034617458,0.0032928244,0.0031138263,0.000019950685,0.00010136375,0.000058829224,0.0000309393,0.015599369],"genre_scores_gemma":[0.99344665,0.0005567781,0.003806973,0.00015222396,0.000006327398,0.00007384977,0.000038675564,0.000010109417,0.0019085252],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9920942,0.0045682457,0.00025593163,0.00036348242,0.0013502918,0.0013679282],"domain_scores_gemma":[0.9940462,0.0025132736,0.0010371824,0.00038120436,0.0014572149,0.00056485273],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008980619,0.00042671844,0.0002861188,0.0012063484,0.005020688,0.004314655,0.0012892693,0.0013727158,0.0030540877],"category_scores_gemma":[0.010201685,0.00063181436,0.0003793021,0.002551103,0.0025292146,0.002347075,0.0032568753,0.0011262993,0.00051938725],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037824176,0.0008171542,0.24342841,0.0016038783,0.00008330697,0.01016927,0.26740834,0.012600705,0.010768732,0.03959415,0.009953779,0.4031941],"study_design_scores_gemma":[0.000025150559,0.0006695507,0.23940147,0.0010168104,0.00004740277,0.0021812166,0.62549114,0.0094411615,0.0027013393,0.0065383855,0.11238836,0.00009800308],"about_ca_topic_score_codex":0.014768899,"about_ca_topic_score_gemma":0.026019664,"teacher_disagreement_score":0.014768899,"about_ca_system_score_codex":0.004178032,"about_ca_system_score_gemma":0.007950222,"threshold_uncertainty_score":0.04749459},"labels":[],"label_agreement":null},{"id":"W4382400439","doi":"10.1061/jcemd4.coeng-12764","title":"Practitioners’ Concerns about Their Liability toward BIM Collaborative Digital Mockups: Case Study in Civil Engineering","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Liability; CLARITY; Asset (computer security); Context (archaeology); Process (computing); Work (physics); Building information modeling; Exploratory research; Legal liability; Knowledge management; Computer science; Business; Engineering ethics; Engineering; Computer security; Sociology; Operations management; Accounting","score_opus":0.010828764562692262,"score_gpt":0.22624843424984611,"score_spread":0.21541966968715384,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382400439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9897376,0.00014326816,0.0064841653,0.0014481911,0.000012085847,0.00016540464,0.000010399026,0.000014121541,0.0019849208],"genre_scores_gemma":[0.9906769,0.00027637332,0.0072692595,0.0005212669,0.000014275372,0.00019063476,0.000013477628,0.000013389845,0.0010243232],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.941057,0.048660465,0.0017696948,0.0018299676,0.0040977155,0.0025851708],"domain_scores_gemma":[0.87289315,0.10331972,0.00825941,0.004307626,0.007211399,0.0040086904],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.039088544,0.0007631639,0.0006853075,0.0020228722,0.01393733,0.004053485,0.0029536814,0.008540789,0.0019164243],"category_scores_gemma":[0.08011527,0.0010835418,0.0007106954,0.0017192251,0.010007913,0.0047768652,0.0072579766,0.0044222036,0.0004978077],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010366456,0.0011781725,0.0110796355,0.00026198674,0.000015285566,0.010725932,0.9536486,0.0008843756,0.0021544164,0.0036228134,0.00064781116,0.015677376],"study_design_scores_gemma":[0.00005237526,0.0010447562,0.006407661,0.0003593148,0.000030243233,0.0064094816,0.96635413,0.0025551931,0.0027574897,0.0023969302,0.011540203,0.00009223318],"about_ca_topic_score_codex":0.0044663996,"about_ca_topic_score_gemma":0.008262868,"teacher_disagreement_score":0.039088544,"about_ca_system_score_codex":0.004597993,"about_ca_system_score_gemma":0.0039891866,"threshold_uncertainty_score":0.20672244},"labels":[],"label_agreement":null},{"id":"W4382537193","doi":"10.1061/jcemd4.coeng-13637","title":"Measurement of Information Loss and Transfer Impacts of Technology Systems in Offsite Construction Processes","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Interoperability; Building information modeling; Documentation; Process (computing); Information transfer; Systems engineering; Information system; Risk analysis (engineering); Construction management; Productivity; Engineering; Information technology; Computer science; Construction engineering; Civil engineering; Operations management","score_opus":0.004386788376904425,"score_gpt":0.17144924000667444,"score_spread":0.16706245162977001,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382537193","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9662578,0.0001226915,0.025078114,0.0001283555,0.000007627441,0.00027449045,0.00015115179,0.00006358344,0.00791627],"genre_scores_gemma":[0.99485105,0.00007819912,0.004466173,0.000013509785,0.0000017311944,0.000090886264,0.0000921758,0.000009254083,0.00039688652],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9911184,0.0032557494,0.0004943404,0.00050655485,0.0039435634,0.0006814217],"domain_scores_gemma":[0.96470547,0.024618948,0.004293029,0.0025358987,0.0033715672,0.00047508866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005504487,0.000632869,0.00037262493,0.002641198,0.0008148863,0.0024507712,0.0008126213,0.0010924096,0.0019127933],"category_scores_gemma":[0.023757622,0.00029408638,0.00061846344,0.0027600243,0.0016575411,0.0036053513,0.0025465933,0.0010994567,0.00026354194],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0028153185,0.0041133496,0.29897216,0.0016511086,0.00037951977,0.0013487352,0.014815694,0.33069858,0.05174741,0.031784497,0.0010345097,0.26063913],"study_design_scores_gemma":[0.00013261837,0.0069681625,0.4020144,0.00049550243,0.0004698003,0.0009176036,0.024535678,0.36336556,0.173409,0.019766875,0.0076706465,0.00025416556],"about_ca_topic_score_codex":0.0022240577,"about_ca_topic_score_gemma":0.001427893,"teacher_disagreement_score":0.005504487,"about_ca_system_score_codex":0.0027967787,"about_ca_system_score_gemma":0.0013122595,"threshold_uncertainty_score":0.029110849},"labels":[],"label_agreement":null},{"id":"W4382539372","doi":"10.18280/mmep.100305","title":"A Comprehensive Analysis of BIM Technology's Critical Role in Assessing Cost for Complex Dam Construction Projects","year":2023,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Construction engineering; Engineering; Building information modeling; Systems engineering; Civil engineering; Computer science; Operations management","score_opus":0.04588149244804591,"score_gpt":0.27007489741616025,"score_spread":0.22419340496811435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382539372","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.69645965,0.028904924,0.13368073,0.00692565,0.0001911451,0.0006853713,0.0010593203,0.00024893932,0.13184425],"genre_scores_gemma":[0.91549623,0.012437021,0.06861199,0.00023525531,0.00005629562,0.00018419533,0.00033477508,0.00006323971,0.0025809829],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9922327,0.002974352,0.00042569116,0.0002636389,0.0038906592,0.00021294273],"domain_scores_gemma":[0.9732565,0.014874911,0.0023307307,0.0008165546,0.008433884,0.00028734206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009810878,0.0006300786,0.00038768098,0.0076055387,0.0010320452,0.0038655938,0.00066379475,0.00061155506,0.0017399971],"category_scores_gemma":[0.032951627,0.00048745042,0.00036531582,0.008666792,0.0010583738,0.0042757657,0.0013873805,0.00058264006,0.00024761198],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012471883,0.00013868231,0.068335384,0.0024862187,0.00009197286,0.0006165201,0.006106583,0.016695824,0.004214384,0.06277371,0.00450873,0.83390725],"study_design_scores_gemma":[0.00002844536,0.0008260115,0.5297444,0.009431149,0.00062588154,0.003829874,0.041347202,0.090374336,0.013079142,0.04937314,0.2609836,0.0003568897],"about_ca_topic_score_codex":0.0055425162,"about_ca_topic_score_gemma":0.011444711,"teacher_disagreement_score":0.009810878,"about_ca_system_score_codex":0.0041628843,"about_ca_system_score_gemma":0.005499462,"threshold_uncertainty_score":0.051885486},"labels":[],"label_agreement":null},{"id":"W4382582499","doi":"10.1088/1742-6596/2530/1/011001","title":"Preface","year":2023,"lang":"en","type":"article","venue":"Journal of Physics Conference Series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"China; Publishing; Library science; Engineering; Engineering ethics; Political science; Computer science; Law","score_opus":0.01922238055430596,"score_gpt":0.22180955488047238,"score_spread":0.2025871743261664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382582499","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014904405,0.011863645,0.006956627,0.021427177,0.12114087,0.0005743979,0.013102923,0.002670456,0.8207734],"genre_scores_gemma":[0.007621372,0.0083011035,0.0038086171,0.005621743,0.021851677,0.0003517002,0.015944602,0.0014864263,0.93501276],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984522,0.00021155742,0.00013960972,0.00030054495,0.0007576036,0.00013843966],"domain_scores_gemma":[0.9954684,0.0007069612,0.00019714255,0.0005651707,0.0023574352,0.00070490985],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001456457,0.0011612218,0.0009682983,0.0028439767,0.0023753582,0.006233264,0.0020238275,0.0018778936,0.54392374],"category_scores_gemma":[0.010048327,0.0003739182,0.0007655224,0.0023339586,0.00083056884,0.004353876,0.002830848,0.0029432925,0.39833686],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037407764,0.000022894597,0.00010168193,0.00019152729,0.000004230336,0.00006451498,0.00011999915,0.00007603505,0.00015383765,0.007031537,0.93767655,0.05451966],"study_design_scores_gemma":[0.0000034499312,0.000011984322,0.00012558415,0.000086457054,0.0000017126221,0.000058334583,0.0000644873,0.000020311869,0.00005293195,0.0014688578,0.998102,0.0000039333154],"about_ca_topic_score_codex":0.0021214616,"about_ca_topic_score_gemma":0.0021546448,"teacher_disagreement_score":0.45607626,"about_ca_system_score_codex":0.0019205175,"about_ca_system_score_gemma":0.002726367,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4382680959","doi":"10.11159/iccste23","title":"Proceedings of the 8th International Conferenceon Civil, Structural and Transportation Engineering (ICCSTE 2023)","year":2023,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Computer science; Engineering ethics; Construction engineering; Engineering management; Civil engineering; Aeronautics","score_opus":0.013058005742124812,"score_gpt":0.21553056280869307,"score_spread":0.20247255706656825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4382680959","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018092623,0.023818996,0.16291194,0.014695331,0.11089669,0.00078555365,0.008670862,0.005269797,0.65485823],"genre_scores_gemma":[0.019339237,0.0072947433,0.027028231,0.0011708176,0.0034523252,0.00024045362,0.0132822,0.0012110386,0.92698103],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981785,0.00037916377,0.00008410652,0.00016322054,0.0009693068,0.0002257396],"domain_scores_gemma":[0.99650407,0.00029934273,0.00009993923,0.00037556986,0.0019502385,0.00077096256],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029451612,0.0013828705,0.001229517,0.0016643672,0.0008983617,0.0046789683,0.0012816027,0.0017953151,0.20152695],"category_scores_gemma":[0.0021793293,0.00034776496,0.0008169397,0.0013394998,0.00068517914,0.0020448004,0.0030078313,0.0023009202,0.10213225],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024525324,0.0002574449,0.0007891265,0.0002198119,0.000024478484,0.00012309817,0.00006727319,0.00075261574,0.0031029668,0.0038633277,0.7737429,0.21681185],"study_design_scores_gemma":[0.000019899138,0.00008846166,0.0019551401,0.00013372785,0.00002042451,0.00019335555,0.00008046173,0.0030243313,0.0024160445,0.0023915728,0.98965865,0.000017943064],"about_ca_topic_score_codex":0.0043394184,"about_ca_topic_score_gemma":0.011159532,"teacher_disagreement_score":0.20152695,"about_ca_system_score_codex":0.0008990946,"about_ca_system_score_gemma":0.0025800413,"threshold_uncertainty_score":0.6741748},"labels":[],"label_agreement":null},{"id":"W4383682086","doi":"10.35490/ec3.2023.264","title":"A blockchain-based approach for managing construction claims","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Unavailability; Ambiguity; Blockchain; Computer science; Risk analysis (engineering); Quality (philosophy); Trustworthiness; Reliability (semiconductor); Process (computing); Computer security; Information management; Process management; Knowledge management; Business; Reliability engineering; Engineering","score_opus":0.014524235546994703,"score_gpt":0.22444583556680964,"score_spread":0.20992160001981494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682086","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029588122,0.0013190707,0.9317303,0.0019929165,0.0003329143,0.0008848114,0.00032942288,0.0011905655,0.03263185],"genre_scores_gemma":[0.7564885,0.0017599461,0.2129012,0.0003184798,0.0001674493,0.00062545546,0.000657255,0.0001206917,0.026961105],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99795556,0.00060799555,0.00014370475,0.0002652268,0.00080338883,0.00022405694],"domain_scores_gemma":[0.9981207,0.0006670342,0.00017586205,0.00032334076,0.000481741,0.00023119168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023290052,0.00047140237,0.00079977716,0.001287441,0.0025674931,0.0028564348,0.0020228655,0.0016352275,0.007715532],"category_scores_gemma":[0.003442729,0.00034995234,0.00057494757,0.0020511027,0.0012981435,0.004227555,0.00389365,0.0013483866,0.0015348091],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007900938,0.0006310902,0.0032406664,0.00073595025,0.00017584853,0.0024164803,0.0023009602,0.29583028,0.02010287,0.29737076,0.019208932,0.35719603],"study_design_scores_gemma":[0.000108049164,0.00018490522,0.0005608743,0.00011266514,0.000068526795,0.0004997186,0.0004458388,0.82937455,0.00487588,0.10481923,0.05887651,0.00007319545],"about_ca_topic_score_codex":0.0057894695,"about_ca_topic_score_gemma":0.0076995147,"teacher_disagreement_score":0.007715532,"about_ca_system_score_codex":0.0014251454,"about_ca_system_score_gemma":0.0035764517,"threshold_uncertainty_score":0.025811017},"labels":[],"label_agreement":null},{"id":"W4383682303","doi":"10.35490/ec3.2023.263","title":"Human-Data Interaction (HDI) and blockchain: an exploration of the open research challenges for the construction community","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Immutability; Blockchain; Transparency (behavior); Computer science; Corporate governance; Data science; Computer security; Business","score_opus":0.41693402393856127,"score_gpt":0.4230731833766217,"score_spread":0.006139159438060426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.17449974,0.0131280925,0.4144411,0.13320664,0.0006824105,0.00060663535,0.00031597746,0.00024632204,0.2628731],"genre_scores_gemma":[0.9558311,0.0044821925,0.030658826,0.0018346319,0.00015207392,0.00030873143,0.000089289206,0.00009970055,0.0065434594],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.955659,0.033942204,0.0008435521,0.0019893788,0.0053148945,0.0022510486],"domain_scores_gemma":[0.9101116,0.07484816,0.0020813642,0.0066297348,0.0044859475,0.0018430848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.049483046,0.0004648593,0.0007682417,0.002644241,0.0078026657,0.020192266,0.0024453343,0.005207856,0.007982963],"category_scores_gemma":[0.035189785,0.00058100413,0.0006541787,0.006018239,0.030164745,0.028977254,0.013672042,0.0048062047,0.00075470447],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040145715,0.00003841567,0.0015741842,0.00024503528,0.000010042374,0.00017376414,0.014826093,0.0015172003,0.0002589592,0.95531625,0.0014266219,0.024573294],"study_design_scores_gemma":[0.000019655856,0.00007857792,0.0014080281,0.0011070833,0.000014504879,0.00035593292,0.04280056,0.008369066,0.0010882271,0.7996835,0.14501938,0.00005546904],"about_ca_topic_score_codex":0.005581619,"about_ca_topic_score_gemma":0.005294042,"teacher_disagreement_score":0.049483046,"about_ca_system_score_codex":0.009299291,"about_ca_system_score_gemma":0.015015643,"threshold_uncertainty_score":0.2616945},"labels":[],"label_agreement":null},{"id":"W4383682627","doi":"10.35490/ec3.2023.237","title":"Comparative analysis of room generation methods using rule language-based evaluation in BIM","year":2023,"lang":"en","type":"article","venue":"Computing in construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Simulated annealing; Constraint (computer-aided design); Jump; Representation (politics); Search algorithm; Grid; Computer engineering; Algorithm; Engineering; Mathematics","score_opus":0.06852078058170981,"score_gpt":0.3937417046821252,"score_spread":0.3252209241004154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383682627","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2947518,0.001278003,0.6782865,0.00026383283,0.000078613586,0.00046384364,0.00037916927,0.0040331464,0.020465119],"genre_scores_gemma":[0.6999709,0.00036620797,0.29702988,0.00005236038,0.000012546027,0.00023944763,0.0004271992,0.00042225918,0.0014792993],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9939381,0.0027831993,0.00032787083,0.00044410402,0.002186408,0.0003203279],"domain_scores_gemma":[0.984092,0.012199684,0.00036438426,0.001353207,0.0017798821,0.00021085131],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006144279,0.0007696009,0.0010947405,0.0016171386,0.0004921711,0.0016634113,0.0017307715,0.00093969365,0.0035047107],"category_scores_gemma":[0.017065046,0.00040675802,0.0007084862,0.001603199,0.0007454594,0.0019895118,0.0011129391,0.0007856776,0.0005645453],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090258935,0.0005780904,0.0032011857,0.00060360157,0.000118031734,0.00010506523,0.00031294842,0.6148646,0.008014279,0.01080968,0.0013184438,0.3591715],"study_design_scores_gemma":[0.000047886704,0.00019367794,0.0008726753,0.00002048004,0.000029980138,0.0000359331,0.000097200704,0.98764753,0.008128435,0.0016887729,0.0012168856,0.000020518924],"about_ca_topic_score_codex":0.0056477324,"about_ca_topic_score_gemma":0.006204796,"teacher_disagreement_score":0.006144279,"about_ca_system_score_codex":0.0013613735,"about_ca_system_score_gemma":0.0014671896,"threshold_uncertainty_score":0.032494485},"labels":[],"label_agreement":null},{"id":"W4383823788","doi":"10.11159/iccste23.141","title":"Sustainability Cement Block Selection Based On IntervalValued Hesitant Fuzzy Group Analysis For Construction Industry Problems","year":2023,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Sustainability; Selection (genetic algorithm); Block (permutation group theory); Construction industry; Group (periodic table); Fuzzy set; Cement; Computer science; Fuzzy logic; Artificial intelligence; Engineering; Construction engineering; Mathematics; Chemistry; Materials science; Composite material","score_opus":0.01407349407508257,"score_gpt":0.22347070899502694,"score_spread":0.20939721491994437,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383823788","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028019505,0.00028649575,0.9684742,0.00013981834,0.000020443424,0.00006835382,0.000023601075,0.000037081118,0.002930495],"genre_scores_gemma":[0.79411745,0.00053989445,0.20197561,0.00006204246,0.000051422398,0.00030216208,0.00008318421,0.0000246428,0.0028435667],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9985,0.0007755731,0.00007082301,0.00017933804,0.00035720176,0.000117050826],"domain_scores_gemma":[0.99877757,0.0008309753,0.000103362065,0.000031860705,0.00019959276,0.00005665908],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002545864,0.00090945273,0.0010969599,0.001655312,0.0007914222,0.0015074163,0.00085813494,0.00093760807,0.0017176715],"category_scores_gemma":[0.0031461464,0.00034031627,0.0012909576,0.0011084366,0.0008855901,0.0011800369,0.00096618803,0.00080207177,0.00012361574],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008521882,0.000054096923,0.0011650719,0.00016770557,0.000108334425,0.000242949,0.00027919983,0.9381271,0.0018228919,0.031675644,0.0005568514,0.025714818],"study_design_scores_gemma":[0.000005297046,0.000024153029,0.00013452746,0.000008858236,0.000014411873,0.000022430013,0.000054484062,0.9910623,0.00037945074,0.007994496,0.0002906891,0.000008902324],"about_ca_topic_score_codex":0.0032844828,"about_ca_topic_score_gemma":0.0021468715,"teacher_disagreement_score":0.0032844828,"about_ca_system_score_codex":0.0011229011,"about_ca_system_score_gemma":0.0013898641,"threshold_uncertainty_score":0.013463974},"labels":[],"label_agreement":null},{"id":"W4383876955","doi":"10.24928/2023/0257","title":"Lean Construction and Building Information Modeling (BIM) in Design Management: Survey Results From French Companies","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Computer science; Construction engineering; Knowledge management; Business; Engineering; Operations management","score_opus":0.03741784460179708,"score_gpt":0.23262975154321286,"score_spread":0.19521190694141577,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383876955","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99841475,0.00023549599,0.0002894557,0.000074599586,0.0000019694448,0.000013619113,0.00005338973,0.0000053672165,0.00091121806],"genre_scores_gemma":[0.9988833,0.00018660632,0.00027626878,0.000058450103,0.0000027010178,0.000023290902,0.00009615596,0.0000020881405,0.00047106203],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99527586,0.0022734448,0.00034760934,0.0003574472,0.0011838425,0.0005618052],"domain_scores_gemma":[0.98963773,0.005767486,0.0017775777,0.0002782878,0.0019769697,0.0005618342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0060827755,0.00039097026,0.00025538087,0.0017508083,0.00064393715,0.0017746396,0.00025869193,0.0008209215,0.0011683388],"category_scores_gemma":[0.009425825,0.0002480751,0.00030365877,0.0018273498,0.0006539795,0.00084668025,0.000879124,0.00037997364,0.00025983417],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031632837,0.00052758184,0.86733115,0.000382024,0.00010170207,0.00046431035,0.047227077,0.0014578372,0.0037442103,0.00065178616,0.0013500224,0.07644608],"study_design_scores_gemma":[0.000018649765,0.0009789347,0.93297595,0.0001464681,0.000050263545,0.0003126471,0.051013596,0.0014225726,0.0018344913,0.00009993469,0.011091282,0.00005527166],"about_ca_topic_score_codex":0.020261835,"about_ca_topic_score_gemma":0.022669733,"teacher_disagreement_score":0.020261835,"about_ca_system_score_codex":0.002333779,"about_ca_system_score_gemma":0.0011336786,"threshold_uncertainty_score":0.040287793},"labels":[],"label_agreement":null},{"id":"W4383877022","doi":"10.24928/2023/0203","title":"Development of an Optimization Model Based on Business Process Re-Engineering to Minimize Construction Projects Delay","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Computer science; Process (computing); Industrial engineering; Manufacturing engineering; Systems engineering; Engineering; Operating system","score_opus":0.023694626744490528,"score_gpt":0.24078833681937115,"score_spread":0.21709371007488062,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383877022","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.021193385,0.00020158199,0.9688352,0.00023563682,0.000027706754,0.00014856849,0.00013331484,0.0002614383,0.008963242],"genre_scores_gemma":[0.7240454,0.00076703005,0.26405498,0.00008138144,0.00001990348,0.0011429264,0.0003533603,0.00011426692,0.009420704],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994924,0.00016813539,0.00002542535,0.00009620331,0.0001315765,0.00008632578],"domain_scores_gemma":[0.99958676,0.0002038297,0.000071447175,0.000015847929,0.00010004849,0.000021921596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011045556,0.0009494794,0.0009463194,0.0007062767,0.00060156465,0.0019818565,0.0014735402,0.0013628224,0.003568506],"category_scores_gemma":[0.0011718527,0.0007548947,0.001330455,0.0009278149,0.00040562113,0.0011024746,0.00092199433,0.0012882542,0.00045792203],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001191156,0.000014681808,0.00011341647,0.000026357384,0.0000067434016,0.000029061333,0.00001940242,0.9930569,0.0004996709,0.0031698588,0.00008907935,0.002962946],"study_design_scores_gemma":[0.0000058089254,0.000013763837,0.000034257748,0.000005390489,0.000006051888,0.0000043752707,0.000009093159,0.99838233,0.00030381657,0.0008731977,0.00035861332,0.0000032905396],"about_ca_topic_score_codex":0.01457344,"about_ca_topic_score_gemma":0.008837284,"teacher_disagreement_score":0.01457344,"about_ca_system_score_codex":0.0018696844,"about_ca_system_score_gemma":0.003902452,"threshold_uncertainty_score":0.028977275},"labels":[],"label_agreement":null},{"id":"W4383957461","doi":"10.24928/2023/0149","title":"Promoting the IPD Delivery Method in Construction Projects: A BIM-Based Smart Contract Approach","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Integrated project delivery; Construction engineering; Computer science; Smart contract; Process management; Systems engineering; Engineering management; Business; Engineering; Computer security; Project management; Blockchain","score_opus":0.02621325410979069,"score_gpt":0.2493493027006428,"score_spread":0.2231360485908521,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957461","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.030954814,0.00025604665,0.94495815,0.0009791953,0.000055488577,0.000661018,0.00015591971,0.0013207096,0.020658601],"genre_scores_gemma":[0.3631226,0.00049392966,0.627931,0.00013183634,0.000028377386,0.00058114144,0.0003709887,0.00014494533,0.00719511],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99273443,0.003143721,0.00053515966,0.00064201606,0.0025719367,0.00037273346],"domain_scores_gemma":[0.99616003,0.0011144673,0.0005918073,0.0010530686,0.0008164495,0.00026417404],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006416902,0.00060343643,0.000505301,0.0026146078,0.0015900703,0.0038635305,0.0019404701,0.0014072962,0.0045041316],"category_scores_gemma":[0.0075265504,0.0006251936,0.0006064912,0.002712593,0.0015332993,0.006647401,0.0055990107,0.0010467586,0.0012722325],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030026532,0.00073251064,0.011341635,0.0006699752,0.000082642924,0.00072946487,0.0036143898,0.10795397,0.0157029,0.16830213,0.005226923,0.68534315],"study_design_scores_gemma":[0.00009563029,0.00043387426,0.0052408427,0.00041387015,0.00010343887,0.0010961009,0.002492268,0.76324755,0.023185996,0.0809625,0.122549355,0.00017862426],"about_ca_topic_score_codex":0.0026859166,"about_ca_topic_score_gemma":0.003259762,"teacher_disagreement_score":0.006416902,"about_ca_system_score_codex":0.0015874684,"about_ca_system_score_gemma":0.004319068,"threshold_uncertainty_score":0.033936203},"labels":[],"label_agreement":null},{"id":"W4383957518","doi":"10.24928/2023/0123","title":"Factors Influencing Cycle Times in Offsite Construction","year":2023,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workstation; Computer science; Framing (construction); Process (computing); Schedule; Identification (biology); Process management; Reliability engineering; Operations management; Engineering; Operating system","score_opus":0.018240678264771784,"score_gpt":0.23057161489420955,"score_spread":0.21233093662943775,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4383957518","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98802376,0.00019367285,0.0058748107,0.000048397626,0.000009084543,0.000051462237,0.00006424632,0.000031470474,0.0057031675],"genre_scores_gemma":[0.9970317,0.00008434312,0.001756742,0.0000063115067,0.0000024235571,0.000019548082,0.00005814945,0.000025213712,0.0010155871],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9974516,0.00080251606,0.00018589052,0.00028409463,0.0010092601,0.00026660948],"domain_scores_gemma":[0.98720205,0.007839604,0.0025414238,0.00041688312,0.0015797331,0.00042036438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020921822,0.0003436823,0.00021965305,0.0029291848,0.0012106005,0.00198255,0.0005399588,0.00048530128,0.0030300755],"category_scores_gemma":[0.016135316,0.0003336154,0.00026462585,0.002790599,0.0008799005,0.0008258924,0.00081825163,0.00041316423,0.0002807423],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010531227,0.00040186456,0.6198041,0.0006920763,0.000057720532,0.0024142985,0.036828388,0.02759804,0.04415834,0.004930705,0.0012729121,0.26078847],"study_design_scores_gemma":[0.00001315799,0.00056260603,0.93569285,0.00017735595,0.000064424865,0.00092774327,0.026819112,0.0078073097,0.010936331,0.0029916961,0.013887975,0.000119420845],"about_ca_topic_score_codex":0.008707309,"about_ca_topic_score_gemma":0.020409703,"teacher_disagreement_score":0.008707309,"about_ca_system_score_codex":0.0023819811,"about_ca_system_score_gemma":0.0018172651,"threshold_uncertainty_score":0.017313242},"labels":[],"label_agreement":null},{"id":"W4384433961","doi":"10.5220/0012004900003546","title":"Managing Trade-off Between Cost and Time in Project Scheduling Problems Using Discrete Event Simulation","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Discrete event simulation; Computer science; Scheduling (production processes); Job shop scheduling; Distributed computing; Real-time computing; Parallel computing; Embedded system; Simulation; Mathematical optimization; Routing (electronic design automation); Mathematics","score_opus":0.027792388957515124,"score_gpt":0.2757980651736847,"score_spread":0.2480056762161696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384433961","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2579119,0.00033174653,0.7357541,0.00051221997,0.000072958974,0.00014552307,0.00009145365,0.00026733466,0.0049127555],"genre_scores_gemma":[0.9387623,0.00010503415,0.05989689,0.000042655687,0.000015720294,0.00008814011,0.00005880453,0.00004136642,0.0009891692],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99853086,0.00083421177,0.000071939714,0.00014111384,0.00023276922,0.0001891464],"domain_scores_gemma":[0.98809075,0.010429859,0.0004968893,0.00020879651,0.00034282537,0.0004310251],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041964613,0.0008301554,0.0017762199,0.0010095191,0.00064341753,0.0017973644,0.0016331311,0.0015487736,0.0018342616],"category_scores_gemma":[0.009261237,0.0012289241,0.00090782857,0.0010518037,0.0008366526,0.0017769007,0.0012659421,0.0015695064,0.000113491325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038086833,0.000030070147,0.00022970373,0.000009474587,0.000012299899,0.000008372905,0.000009722285,0.9967078,0.00012343453,0.0010113888,0.000031233736,0.0017882888],"study_design_scores_gemma":[0.000005045205,0.0000074109507,0.00002946452,0.0000010213346,0.0000032525616,0.0000012500341,0.0000039190827,0.9992705,0.00005894486,0.0005941029,0.000023962368,0.0000010784572],"about_ca_topic_score_codex":0.009573405,"about_ca_topic_score_gemma":0.008017184,"teacher_disagreement_score":0.009573405,"about_ca_system_score_codex":0.0017162217,"about_ca_system_score_gemma":0.0018090438,"threshold_uncertainty_score":0.022193313},"labels":[],"label_agreement":null},{"id":"W4384692292","doi":"10.3846/jcem.2023.19215","title":"EXPLORING EFFECT OF DIFFERENT RESOURCE QUALITIES ON PROCESS EFFICIENCY IN CONSTRUCTION PILE INSTALLATION","year":2023,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Pile; Work (physics); Process (computing); Resource (disambiguation); Engineering; Field (mathematics); Section (typography); Originality; Civil engineering; Construction engineering; Architectural engineering; Computer science; Mechanical engineering; Structural engineering","score_opus":0.01593281110756711,"score_gpt":0.2130934328799562,"score_spread":0.19716062177238908,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4384692292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9940566,0.000032755157,0.003877549,0.000020937367,0.0000018460453,0.00004589328,0.000047662605,0.000021769878,0.0018949314],"genre_scores_gemma":[0.9976083,0.000018723276,0.002107107,0.0000030739013,7.342506e-7,0.000015428572,0.000029056591,0.0000060879042,0.0002116031],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9949945,0.002232696,0.00024806522,0.00051312376,0.0015750936,0.00043661543],"domain_scores_gemma":[0.9808847,0.014140775,0.0024694747,0.0009741988,0.0012102185,0.0003206965],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030964655,0.0004519915,0.00036189993,0.0010857815,0.00049920427,0.0013630235,0.000497927,0.0004913707,0.0025816676],"category_scores_gemma":[0.017336037,0.0002732948,0.0004710264,0.0014252857,0.0010527255,0.0013975843,0.0010790208,0.00046238536,0.00026877713],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003973982,0.0025659474,0.6243545,0.001248857,0.00034243838,0.0011144091,0.0074701495,0.09047276,0.0773291,0.002921909,0.0003709102,0.18783519],"study_design_scores_gemma":[0.000025391704,0.003115968,0.93830025,0.000061208164,0.00014616098,0.00017527028,0.005082043,0.021815846,0.02937069,0.0008340421,0.0010097994,0.00006320221],"about_ca_topic_score_codex":0.003567352,"about_ca_topic_score_gemma":0.0048716525,"teacher_disagreement_score":0.003567352,"about_ca_system_score_codex":0.0011637217,"about_ca_system_score_gemma":0.0009004342,"threshold_uncertainty_score":0.01637584},"labels":[],"label_agreement":null},{"id":"W4385297687","doi":"10.1162/99608f92.9ba2bd43","title":"Reinforcing Reproducibility and Replicability: An Introduction","year":2023,"lang":"en","type":"article","venue":"Harvard Data Science Review","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"National Science Foundation","keywords":"Reproducibility; Computer science; Statistics; Mathematics","score_opus":0.052198051255793125,"score_gpt":0.3084426474261471,"score_spread":0.25624459617035394,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385297687","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":"reproducibility","model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":"reproducibility","domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014932613,0.24795419,0.12857345,0.4913547,0.08038438,0.00053116475,0.0004235283,0.0005564016,0.048728894],"genre_scores_gemma":[0.08644813,0.30886194,0.126915,0.22419345,0.21170343,0.002186368,0.00060748286,0.0023572915,0.03672697],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9301143,0.04375318,0.0052328305,0.0050472976,0.014389551,0.0014628682],"domain_scores_gemma":[0.72280943,0.23219325,0.0054934737,0.010431488,0.026842192,0.0022302037],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.06195481,0.0017525761,0.0017968537,0.006650229,0.005796846,0.018042933,0.0038263588,0.010550097,0.01059155],"category_scores_gemma":[0.17329612,0.0012165693,0.00210421,0.006616653,0.031198088,0.028713588,0.0073823,0.020566337,0.0039214804],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059194583,0.000046249894,0.0005535533,0.0023454148,0.00005138389,0.00018295973,0.005782756,0.00063944055,0.00048676,0.7134391,0.19531134,0.08110183],"study_design_scores_gemma":[0.000015300175,0.000054367607,0.00031875548,0.003015654,0.000022269161,0.00024051862,0.0010400859,0.0006830131,0.0002902753,0.26540995,0.7288497,0.000060095033],"about_ca_topic_score_codex":0.0047907364,"about_ca_topic_score_gemma":0.004032794,"teacher_disagreement_score":0.9380452,"about_ca_system_score_codex":0.0087470915,"about_ca_system_score_gemma":0.010852004,"threshold_uncertainty_score":0.32765228},"labels":[],"label_agreement":null},{"id":"W4385303665","doi":"10.18280/acsm.470307","title":"Characterization of Lightweight Mortars with Cork and Olive Stone Waste for Old Building Rehabilitation","year":2023,"lang":"en","type":"article","venue":"Annales de Chimie Science des Matériaux","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cork; Mortar; Characterization (materials science); Waste management; Engineering; Environmental science; Archaeology; Materials science; Geography; Composite material","score_opus":0.013604536626115816,"score_gpt":0.2374142748064994,"score_spread":0.22380973818038358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385303665","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9937441,0.00034277575,0.0044998,0.000015981977,0.000020768395,0.000028963976,0.00016335171,0.000053447708,0.0011308532],"genre_scores_gemma":[0.9941666,0.00017730845,0.002446615,0.00001677379,0.000003585608,0.000018019762,0.00016165995,0.00004410863,0.0029652868],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99943453,0.000032660784,0.000026213887,0.0000759113,0.00034880024,0.00008184839],"domain_scores_gemma":[0.99956805,0.00009050173,0.0000701599,0.00004527501,0.0001898287,0.00003611319],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005099397,0.0004708419,0.0005267757,0.0011749571,0.0005250115,0.000731829,0.00049857487,0.00071724906,0.0018923141],"category_scores_gemma":[0.00064384664,0.00029861167,0.0006698364,0.00077827804,0.0005533311,0.00042775212,0.00033490796,0.0003733238,0.0005235369],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019093987,0.000043362827,0.0018334346,0.00010016166,0.000012734126,0.00010527238,0.0001923433,0.0009101977,0.99022055,0.00011832335,0.00008968336,0.0061829514],"study_design_scores_gemma":[0.000008842704,0.00071698695,0.02572233,0.000033782722,0.0000902949,0.0002585622,0.00060624717,0.0025225221,0.96648073,0.00008297487,0.0034489646,0.000027758133],"about_ca_topic_score_codex":0.0016146532,"about_ca_topic_score_gemma":0.005750503,"teacher_disagreement_score":0.0018923141,"about_ca_system_score_codex":0.00036137985,"about_ca_system_score_gemma":0.0004241392,"threshold_uncertainty_score":0.00633049},"labels":[],"label_agreement":null},{"id":"W4385501671","doi":"10.3311/ccc2023-010","title":"SIMULATION-BASED OPTIMIZATION OF PATH PLANNING FOR CAMERA-EQUIPPED UAV CONSIDERING CONSTRUCTION ACTIVITIES","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Computer science; Motion planning; Zoom; Data collection; Schedule; Visibility; Path (computing); Real-time computing; Computer vision; Artificial intelligence; Robot; Engineering","score_opus":0.021502472318450278,"score_gpt":0.24998499718779787,"score_spread":0.2284825248693476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385501671","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11061267,0.00040765223,0.8805731,0.00019959832,0.00006476598,0.00012294398,0.00022889453,0.0004938605,0.007296451],"genre_scores_gemma":[0.8780613,0.00033723543,0.11824492,0.00004334878,0.000014023504,0.00027765415,0.0003855142,0.000070315735,0.002565651],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99975234,0.000067175126,0.000011754522,0.000054361488,0.000057199544,0.000057116038],"domain_scores_gemma":[0.99940205,0.0003454944,0.00008841502,0.000023461453,0.00009092093,0.00004965123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045667466,0.0011139727,0.0009975638,0.0006985971,0.00043034885,0.00078086666,0.0008017401,0.0008419493,0.0019910936],"category_scores_gemma":[0.0012283354,0.0007216536,0.0010132027,0.00066872174,0.00060050975,0.00047070076,0.00087825744,0.0006126551,0.00018302388],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014296168,0.000004453056,0.00018465848,0.000010040573,0.000005111739,0.000015178347,0.000006760378,0.99798465,0.00016246026,0.00026555697,0.00004307438,0.0013037098],"study_design_scores_gemma":[0.000003955684,0.000007009655,0.0000563352,0.0000014402787,0.0000024342667,0.0000026147393,0.0000058878672,0.9996074,0.000088247754,0.00013534451,0.00008786222,0.0000013953271],"about_ca_topic_score_codex":0.026074482,"about_ca_topic_score_gemma":0.015462906,"teacher_disagreement_score":0.026074482,"about_ca_system_score_codex":0.0008490482,"about_ca_system_score_gemma":0.0017371716,"threshold_uncertainty_score":0.05184537},"labels":[],"label_agreement":null},{"id":"W4385548192","doi":"10.3311/ccc2023-056","title":"AUTOMATE AND STANDARDIZE MULTI-STORY BUILDING SCHEDULES THROUGH REPETITIVE SPATIOTEMPORAL MODEL","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Schedule; Computer science; Standardization; Gantt chart; Representation (politics); Focus (optics); Construct (python library); Industrial engineering; Software engineering; Operations research; Systems engineering; Engineering; Programming language","score_opus":0.02372812014783634,"score_gpt":0.2624719724684359,"score_spread":0.23874385232059955,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385548192","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016733179,0.000039222523,0.97792095,0.000036701244,0.000013833194,0.00026130266,0.00044616492,0.0017064473,0.0028421308],"genre_scores_gemma":[0.12201728,0.000120926336,0.87408376,0.000012288765,0.0000036443116,0.0003775589,0.0018950087,0.00037936642,0.0011101943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99831605,0.00045085655,0.00022210897,0.0002982101,0.0006163701,0.00009649442],"domain_scores_gemma":[0.99727887,0.0006355115,0.00036130083,0.00092857843,0.00072299625,0.00007289473],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002190264,0.0006733544,0.0004033473,0.001933856,0.0005080657,0.0012882929,0.0012383821,0.0003385168,0.0027557793],"category_scores_gemma":[0.0053273793,0.0005289957,0.0008528885,0.002081442,0.0004960144,0.001764017,0.0015439778,0.00066156604,0.00092201284],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011056159,0.00019331067,0.008157088,0.0004008618,0.000073359406,0.00023538666,0.0018376496,0.56478614,0.017735284,0.026439574,0.0041712443,0.37585953],"study_design_scores_gemma":[0.000021228056,0.00009892041,0.0039280276,0.000080809354,0.000042467065,0.00014792905,0.00095893594,0.9261801,0.020711653,0.01207272,0.03570462,0.000052517495],"about_ca_topic_score_codex":0.013456345,"about_ca_topic_score_gemma":0.02359079,"teacher_disagreement_score":0.013456345,"about_ca_system_score_codex":0.0012656889,"about_ca_system_score_gemma":0.0028325256,"threshold_uncertainty_score":0.026756048},"labels":[],"label_agreement":null},{"id":"W4385602267","doi":"10.1007/978-3-031-34159-5_39","title":"Lateral Behavior of a 12-story Modular Building Structure with Vertically Unconstrained Inter-modular Connections, Including a Grouted Slip-resistant Mechanism","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Modular design; Structural engineering; Slip (aerodynamics); Engineering; Computer science","score_opus":0.009895611249299142,"score_gpt":0.19704743527991458,"score_spread":0.18715182403061545,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385602267","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96789056,0.00004825504,0.0079290215,0.00009242582,0.000013866181,0.000008860622,0.00009407312,0.0001669872,0.023755984],"genre_scores_gemma":[0.99567324,0.000015115462,0.0007895807,0.0000079898255,0.0000020578552,0.0000042479633,0.000042120224,0.000013892863,0.003451774],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99994373,0.000012085034,0.0000016786979,0.000008932505,0.000018636676,0.000014932734],"domain_scores_gemma":[0.99989367,0.000028948014,0.000020000196,0.000009384888,0.00001866066,0.000029264478],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00010308296,0.0002629827,0.0002045851,0.00029153036,0.0003506881,0.00045453382,0.00049233297,0.0006450413,0.006178058],"category_scores_gemma":[0.000281944,0.00018338721,0.00021656243,0.00020374688,0.00071047025,0.00027566808,0.00049360807,0.00019410466,0.0005488097],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003901717,0.00017650855,0.0028718296,0.000086115986,0.00003430328,0.0015557829,0.00044907033,0.8450902,0.12108612,0.016928703,0.0016207998,0.009710401],"study_design_scores_gemma":[0.00002201394,0.00018426497,0.0032513316,0.000011639251,0.00001556622,0.00011385618,0.0001971469,0.989297,0.004825459,0.0013691314,0.0006925786,0.000020128784],"about_ca_topic_score_codex":0.0025400913,"about_ca_topic_score_gemma":0.0026759123,"teacher_disagreement_score":0.006178058,"about_ca_system_score_codex":0.00033226135,"about_ca_system_score_gemma":0.0002824463,"threshold_uncertainty_score":0.020667613},"labels":[],"label_agreement":null},{"id":"W4385602292","doi":"10.1007/978-3-031-34159-5_7","title":"Behaviour of Beam–Column Connection of Modular Steel Buildings","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Modular design; Prefabrication; Structural engineering; Engineering; Structural system; Robustness (evolution); Process (computing); Computer science","score_opus":0.008012438800936918,"score_gpt":0.1887587897647091,"score_spread":0.1807463509637722,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385602292","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9839798,0.00008893848,0.0064799595,0.00005297845,0.000013575377,0.000010397679,0.00012454133,0.00016176084,0.009087844],"genre_scores_gemma":[0.99660325,0.00003375961,0.00065407116,0.0000062238764,0.00000273197,0.000004702502,0.00009743713,0.000030218485,0.002567654],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998815,0.000030183162,0.0000040374416,0.000021932701,0.00003488057,0.000027380394],"domain_scores_gemma":[0.999622,0.00011914343,0.000057458434,0.000037396123,0.000088096844,0.000075960386],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0001495766,0.00028415874,0.0002906243,0.000496722,0.0003481459,0.0006519526,0.00057948905,0.000800408,0.010680917],"category_scores_gemma":[0.00069196575,0.00032992146,0.00026302808,0.00042494858,0.0005216144,0.00036658676,0.00039803394,0.00028126233,0.0011840943],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008288423,0.00021186282,0.011075234,0.00016975764,0.00007364269,0.0012401763,0.00079661864,0.6875229,0.26389742,0.009901489,0.0031361487,0.021145841],"study_design_scores_gemma":[0.000019312763,0.0002771481,0.019602677,0.000026577522,0.000021310512,0.00018981105,0.00038412208,0.96401155,0.011926235,0.0017463851,0.001763524,0.000031328098],"about_ca_topic_score_codex":0.0033430434,"about_ca_topic_score_gemma":0.0026957248,"teacher_disagreement_score":0.010680917,"about_ca_system_score_codex":0.00031148826,"about_ca_system_score_gemma":0.00022059373,"threshold_uncertainty_score":0.035731196},"labels":[],"label_agreement":null},{"id":"W4385602321","doi":"10.1007/978-3-031-34159-5","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Victoria; University of Regina; University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Political science; Engineering; Engineering ethics; Civil society; Library science; Law; Computer science","score_opus":0.006193766170441778,"score_gpt":0.17616169732987416,"score_spread":0.16996793115943237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385602321","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029485177,0.010770124,0.0020665193,0.025424073,0.045095373,0.00013076085,0.002432824,0.00041645192,0.9107154],"genre_scores_gemma":[0.0034697526,0.0029507105,0.00052174064,0.00048442895,0.00064671115,0.00001875115,0.00079615595,0.000096655065,0.99101514],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850285,0.00007365868,0.00002432028,0.00008615876,0.0010818485,0.00023116816],"domain_scores_gemma":[0.9980508,0.000050567265,0.000017079714,0.000048771995,0.0013987764,0.00043395412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001518114,0.0010951776,0.00068282953,0.0017752673,0.0035726556,0.005716229,0.001207704,0.001865291,0.2470412],"category_scores_gemma":[0.001365625,0.00040768774,0.00048439173,0.0021837542,0.0012503833,0.0011954216,0.0019214774,0.0017020191,0.074291855],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016261116,0.000019831446,0.00015103705,0.00003363712,0.000002446339,0.000028842644,0.000039952647,0.00009565058,0.00018383616,0.0020258084,0.96886885,0.028533744],"study_design_scores_gemma":[0.0000022685754,0.0000035131693,0.0004953971,0.00002892624,0.000002171397,0.000012156881,0.000113805465,0.00010605711,0.00009234371,0.0003140595,0.9988243,0.0000049175796],"about_ca_topic_score_codex":0.55665463,"about_ca_topic_score_gemma":0.81606674,"teacher_disagreement_score":0.55665463,"about_ca_system_score_codex":0.009408144,"about_ca_system_score_gemma":0.030914258,"threshold_uncertainty_score":0.89191264},"labels":[],"label_agreement":null},{"id":"W4385720491","doi":"10.1061/9780784485033.043","title":"Inspection Prioritization Framework and Implementation for Combined, Sanitary, and Storm Sewers","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hamilton Health Sciences; Aecom (Canada)","funders":"","keywords":"Sanitary sewer; Prioritization; Storm; Computer science; Environmental science; Environmental planning; Engineering; Geology; Environmental engineering; Management science; Oceanography","score_opus":0.007661955119420242,"score_gpt":0.2494246872288251,"score_spread":0.24176273210940485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385720491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0388086,0.000070491515,0.9458094,0.0010825514,0.00002724819,0.0015157111,0.00024998185,0.0012048285,0.011231185],"genre_scores_gemma":[0.29150504,0.00008955302,0.70440567,0.00006896837,0.000009938092,0.0006650292,0.00032557375,0.000049820806,0.0028803556],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9964431,0.0011131766,0.00027527893,0.00048426804,0.0012080076,0.00047613695],"domain_scores_gemma":[0.99654156,0.00090148277,0.00044544143,0.00015164142,0.0016269317,0.00033282384],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072378432,0.0006871629,0.00047093662,0.003446268,0.0012717019,0.0026952098,0.0019491221,0.0009133261,0.0038345032],"category_scores_gemma":[0.0070015574,0.0005377129,0.00082194846,0.001440362,0.0009061931,0.0021505265,0.0020893498,0.0011438249,0.00040081504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012320407,0.0006971132,0.011412611,0.0003163136,0.00007319174,0.000556423,0.0023662876,0.6233078,0.008123777,0.1524374,0.0053717215,0.19521411],"study_design_scores_gemma":[0.000042513802,0.00020893682,0.002799228,0.00009870756,0.000033826687,0.00011169299,0.0015385017,0.95362055,0.0032511335,0.026105376,0.0121354675,0.000054060052],"about_ca_topic_score_codex":0.038711138,"about_ca_topic_score_gemma":0.037905004,"teacher_disagreement_score":0.038711138,"about_ca_system_score_codex":0.006223097,"about_ca_system_score_gemma":0.014576009,"threshold_uncertainty_score":0.07697159},"labels":[],"label_agreement":null},{"id":"W4385723933","doi":"10.1108/ecam-05-2022-0394","title":"Facilitating the building commissioning process using building information modeling: an action-research project","year":2023,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Project commissioning; Building information modeling; Process (computing); Action research; Action plan; Plan (archaeology); Process management; Engineering; Systems engineering; Computer science; Engineering management; Publishing; Operations management; Management","score_opus":0.06907814646562467,"score_gpt":0.34494219836169293,"score_spread":0.2758640518960683,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385723933","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72786075,0.0008055373,0.2045901,0.009555661,0.00025307838,0.020463547,0.00085245015,0.0011061102,0.034512788],"genre_scores_gemma":[0.5221156,0.0008956351,0.46510527,0.00075872906,0.000033784876,0.005613177,0.0007325226,0.00019774573,0.0045474973],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.95336944,0.03808659,0.0011163756,0.0013293286,0.0037048357,0.0023934864],"domain_scores_gemma":[0.96761906,0.0189815,0.0016361679,0.004090125,0.0042473986,0.0034257548],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05630069,0.0016133086,0.0006724176,0.0019586335,0.0046421015,0.005694867,0.0027705138,0.0033852682,0.0030092201],"category_scores_gemma":[0.027485615,0.00095677515,0.001101778,0.0022431016,0.0044738944,0.0053616837,0.007342548,0.0040487275,0.00074426824],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001325063,0.0362609,0.020217763,0.004652955,0.00018151106,0.0031210354,0.16852413,0.042448852,0.03356251,0.07107096,0.0149135655,0.6037208],"study_design_scores_gemma":[0.0022746108,0.017538553,0.027895149,0.0052493215,0.0005778983,0.0032590223,0.35809782,0.11787406,0.10486845,0.04416268,0.3174919,0.00071056],"about_ca_topic_score_codex":0.0057490417,"about_ca_topic_score_gemma":0.0060960045,"teacher_disagreement_score":0.05630069,"about_ca_system_score_codex":0.0060527376,"about_ca_system_score_gemma":0.026638135,"threshold_uncertainty_score":0.29775006},"labels":[],"label_agreement":null},{"id":"W4385753057","doi":"10.1016/j.autcon.2023.105052","title":"Digitalization-based process improvement and decision-making in offsite construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Process (computing); Tacit knowledge; Computer science; Building information modeling; Engineering; Industrial engineering; Knowledge management; Operations management","score_opus":0.005055209206338137,"score_gpt":0.23405203043466175,"score_spread":0.2289968212283236,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385753057","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.56112057,0.0010438666,0.38121006,0.0010085797,0.00008601652,0.0002107209,0.000101025376,0.00050549605,0.05471372],"genre_scores_gemma":[0.9713897,0.00018838636,0.026678761,0.00002173644,0.0000067965775,0.000020323232,0.00003855197,0.000016548232,0.001639141],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978744,0.00097356975,0.0001111056,0.0002757974,0.0005603183,0.00020489874],"domain_scores_gemma":[0.9971495,0.0015583759,0.00026823056,0.00048239526,0.00040953126,0.00013195867],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0024951585,0.0004196327,0.00046718796,0.0014198892,0.000778508,0.0038599828,0.0009249433,0.0007220422,0.0026871096],"category_scores_gemma":[0.0052854135,0.00023810656,0.00037151502,0.0016515913,0.002115168,0.0025539582,0.0018885903,0.00095875113,0.0002479408],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00078532717,0.0011389882,0.01341149,0.00030979412,0.000080683865,0.00022116942,0.0039006737,0.1483565,0.011668568,0.14369375,0.0013984719,0.6750346],"study_design_scores_gemma":[0.00013147831,0.0008637896,0.0343677,0.0003120423,0.00018122027,0.00026164745,0.0072916914,0.63291293,0.043158323,0.25424904,0.026142843,0.00012733486],"about_ca_topic_score_codex":0.0053757215,"about_ca_topic_score_gemma":0.0065726317,"teacher_disagreement_score":0.0053757215,"about_ca_system_score_codex":0.002211984,"about_ca_system_score_gemma":0.0021996943,"threshold_uncertainty_score":0.016049147},"labels":[],"label_agreement":null},{"id":"W4385859374","doi":"10.1007/978-3-031-34593-7_6","title":"Enhanced Activity-on-Node Network Diagramming Method for Construction Planning and Scheduling Applications","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Unavailability; Workflow; Computer science; Factoring; Duration (music); Distributed computing; Probabilistic logic; Operations research; Engineering; Industrial engineering; Artificial intelligence; Reliability engineering; Operations management","score_opus":0.012293146992358613,"score_gpt":0.24087647290257375,"score_spread":0.22858332591021513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859374","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0014867081,0.00003554878,0.9939725,0.000016543612,0.000018976987,0.000044460183,0.00014448895,0.0023811127,0.0018997242],"genre_scores_gemma":[0.046797086,0.000117678326,0.94670266,0.00002440593,0.000010540255,0.0001455502,0.00061015965,0.00054282614,0.005048979],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99959606,0.00009623274,0.000027066248,0.00008926118,0.00016624118,0.00002516359],"domain_scores_gemma":[0.9995134,0.00019742084,0.000024544468,0.000094121046,0.00014474975,0.000025780364],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00047043097,0.0008924905,0.00054904044,0.0010288497,0.0004688853,0.0007577603,0.001298726,0.0005007013,0.012584646],"category_scores_gemma":[0.0011748798,0.00042456618,0.0006627142,0.0009960885,0.00023897171,0.00087859854,0.0007593807,0.0008933094,0.0019312312],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016569647,0.00018766437,0.0009731843,0.0004513348,0.000076060016,0.00023609247,0.0005350972,0.17425822,0.029177438,0.03050689,0.011076518,0.7523558],"study_design_scores_gemma":[0.000034454468,0.000040929743,0.00036090155,0.000047408295,0.000045702902,0.00013228155,0.000064609834,0.9259682,0.014320914,0.014274996,0.044682883,0.00002681743],"about_ca_topic_score_codex":0.00566693,"about_ca_topic_score_gemma":0.012301591,"teacher_disagreement_score":0.012584646,"about_ca_system_score_codex":0.0004022543,"about_ca_system_score_gemma":0.0010078816,"threshold_uncertainty_score":0.042099893},"labels":[],"label_agreement":null},{"id":"W4385859382","doi":"10.1007/978-3-031-34593-7_8","title":"Envisioning Digital Twin-Enabled Post-occupancy Evaluations for UVic Engineering Expansion Project","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba; University of Victoria","funders":"","keywords":"Context (archaeology); Certification; Sustainability; Architectural engineering; Plan (archaeology); Process (computing); Systems engineering; Engineering management; Engineering; Computer science; Construction engineering","score_opus":0.014323624633849355,"score_gpt":0.2354696908345159,"score_spread":0.22114606620066657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859382","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31586513,0.0005971581,0.44174436,0.001596005,0.00028575404,0.0004878152,0.00089748274,0.004137111,0.23438919],"genre_scores_gemma":[0.8693519,0.0002501574,0.11114912,0.00007697851,0.000013165703,0.00012526521,0.0005502411,0.0002238113,0.018259289],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99931073,0.000170293,0.00001543612,0.00006469445,0.00024517957,0.00019368077],"domain_scores_gemma":[0.99958235,0.00008114782,0.000019833797,0.000068051915,0.00012751036,0.000121182784],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013248527,0.00048588036,0.0003452965,0.00048027412,0.0007138994,0.0029630908,0.0012318369,0.001101831,0.006887224],"category_scores_gemma":[0.0012954448,0.00029958494,0.00031880153,0.00050563534,0.0006877171,0.0027239088,0.0028004064,0.0009513399,0.0015048633],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013224288,0.00076730934,0.012091251,0.00038161137,0.00006057642,0.0020433639,0.0026746888,0.28661308,0.044615723,0.15280512,0.027286442,0.4693384],"study_design_scores_gemma":[0.000089966015,0.00081724406,0.007252976,0.0002596796,0.000056825706,0.0005430102,0.0056439876,0.79267794,0.025968112,0.05698652,0.10959755,0.000106106505],"about_ca_topic_score_codex":0.0046868203,"about_ca_topic_score_gemma":0.0103531275,"teacher_disagreement_score":0.006887224,"about_ca_system_score_codex":0.0008888151,"about_ca_system_score_gemma":0.0015102057,"threshold_uncertainty_score":0.023040056},"labels":[],"label_agreement":null},{"id":"W4385859424","doi":"10.1007/978-3-031-34593-7_26","title":"Gordie Howe International Bridge Managing a Pile of Paper on a Paperless Project","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Aecom (Canada)","funders":"","keywords":"Documentation; Workflow; Bridge (graph theory); Scope (computer science); Computer science; Process (computing); World Wide Web; Architectural engineering; Engineering; Construction engineering; Database","score_opus":0.012808012717697864,"score_gpt":0.2123447554653309,"score_spread":0.19953674274763306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859424","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00735802,0.004475295,0.015523231,0.006307281,0.0031642527,0.0000962536,0.00015865284,0.0011369543,0.96178013],"genre_scores_gemma":[0.0140449675,0.002163471,0.006977027,0.00043450997,0.00013043293,0.000023769648,0.00014321788,0.00034311126,0.9757396],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99956006,0.000031300777,0.00001201005,0.000064748565,0.00027567428,0.00005616929],"domain_scores_gemma":[0.99975795,0.000029537538,0.000008394667,0.000021906413,0.000111069836,0.00007115489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00068487,0.0005382531,0.00034600263,0.0014785843,0.0022665348,0.003374463,0.00062084314,0.0013999895,0.0727052],"category_scores_gemma":[0.0007498708,0.00034061473,0.00025264497,0.0008735258,0.00041029256,0.003159486,0.001761047,0.0017823237,0.018350245],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000038204966,0.00009443466,0.000342987,0.00009250264,0.000004964082,0.000312418,0.0010706744,0.0008693279,0.0021338202,0.046268385,0.6155756,0.33319667],"study_design_scores_gemma":[0.0000023399105,0.000032850843,0.0003013021,0.000060789665,0.000002511363,0.00015893471,0.0004710895,0.00049244956,0.0006151547,0.0019809129,0.99587244,0.000009186991],"about_ca_topic_score_codex":0.0047847265,"about_ca_topic_score_gemma":0.014570825,"teacher_disagreement_score":0.0727052,"about_ca_system_score_codex":0.0009891612,"about_ca_system_score_gemma":0.0018418438,"threshold_uncertainty_score":0.24322313},"labels":[],"label_agreement":null},{"id":"W4385859429","doi":"10.1007/978-3-031-34593-7_42","title":"An Interactive Decision-Support Tool to Improve Construction Cost Management with Building Information Modeling","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Computer science; Interactivity; Software; Facility management; Context (archaeology); Dimension (graph theory); Risk analysis (engineering); Systems engineering; Engineering; World Wide Web; Operations management","score_opus":0.005279538747388388,"score_gpt":0.2048220489249772,"score_spread":0.19954251017758884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859429","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01935233,0.00011635784,0.9190035,0.00023038723,0.000068382375,0.00015040186,0.0022496728,0.04347305,0.015355943],"genre_scores_gemma":[0.14051196,0.00024656128,0.83808625,0.00013750032,0.000037450227,0.00042314464,0.0044506704,0.0033563827,0.012750096],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996269,0.00007972166,0.000024779945,0.000052351697,0.00019012795,0.00002610979],"domain_scores_gemma":[0.9988298,0.00085672585,0.000033160737,0.000101882506,0.00013146657,0.000047013342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00087559037,0.0013249636,0.00077017315,0.0011663996,0.00038563818,0.0015713373,0.0016644995,0.00079771527,0.028198054],"category_scores_gemma":[0.0022360766,0.00068736396,0.00069576234,0.0011332456,0.00020325075,0.0016790321,0.0013281849,0.0008105086,0.0031316455],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006117181,0.0008139503,0.0020425627,0.00057691993,0.0001760705,0.0005178895,0.0007429682,0.21728204,0.023378719,0.025442453,0.080201596,0.648213],"study_design_scores_gemma":[0.000105390005,0.000059284594,0.0007162881,0.00006475216,0.00008340908,0.000097423166,0.00007815676,0.9277188,0.013077841,0.010522732,0.04742805,0.00004789301],"about_ca_topic_score_codex":0.0044742236,"about_ca_topic_score_gemma":0.0070629655,"teacher_disagreement_score":0.028198054,"about_ca_system_score_codex":0.0004825845,"about_ca_system_score_gemma":0.0005477786,"threshold_uncertainty_score":0.09433192},"labels":[],"label_agreement":null},{"id":"W4385859480","doi":"10.1007/978-3-031-34593-7","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Victoria; University of Regina; University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Civil society; Political science; Engineering ethics; Engineering; Library science; Computer science; Law","score_opus":0.006193766170441778,"score_gpt":0.17616169732987416,"score_spread":0.16996793115943237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859480","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029485177,0.010770124,0.0020665193,0.025424073,0.045095373,0.00013076085,0.002432824,0.00041645192,0.9107154],"genre_scores_gemma":[0.0034697526,0.0029507105,0.00052174064,0.00048442895,0.00064671115,0.00001875115,0.00079615595,0.000096655065,0.99101514],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99850285,0.00007365868,0.00002432028,0.00008615876,0.0010818485,0.00023116816],"domain_scores_gemma":[0.9980508,0.000050567265,0.000017079714,0.000048771995,0.0013987764,0.00043395412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001518114,0.0010951776,0.00068282953,0.0017752673,0.0035726556,0.005716229,0.001207704,0.001865291,0.2470412],"category_scores_gemma":[0.001365625,0.00040768774,0.00048439173,0.0021837542,0.0012503833,0.0011954216,0.0019214774,0.0017020191,0.074291855],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016261116,0.000019831446,0.00015103705,0.00003363712,0.000002446339,0.000028842644,0.000039952647,0.00009565058,0.00018383616,0.0020258084,0.96886885,0.028533744],"study_design_scores_gemma":[0.0000022685754,0.0000035131693,0.0004953971,0.00002892624,0.000002171397,0.000012156881,0.000113805465,0.00010605711,0.00009234371,0.0003140595,0.9988243,0.0000049175796],"about_ca_topic_score_codex":0.55665463,"about_ca_topic_score_gemma":0.81606674,"teacher_disagreement_score":0.44334537,"about_ca_system_score_codex":0.009408144,"about_ca_system_score_gemma":0.030914258,"threshold_uncertainty_score":0.89191264},"labels":[],"label_agreement":null},{"id":"W4385859491","doi":"10.1007/978-3-031-34593-7_38","title":"An Integrated BIM-GIS Dashboard to Improve BIM Coordination","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Building information modeling; Dashboard; Context (archaeology); Geographic information system; Engineering; Process management; Engineering management; Construction engineering; Computer science; Operations management; Software engineering; Geography","score_opus":0.007369437346524887,"score_gpt":0.2038492685354579,"score_spread":0.196479831188933,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859491","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019082092,0.00019167828,0.92175484,0.00028244153,0.0004790031,0.00021162834,0.0010388745,0.038822852,0.018136587],"genre_scores_gemma":[0.12930165,0.00030693816,0.84473723,0.00022930077,0.00007547603,0.00026776703,0.0044553867,0.0025500301,0.01807628],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989472,0.00014410238,0.00007298701,0.00014406844,0.00061895617,0.00007265589],"domain_scores_gemma":[0.998575,0.00025682393,0.00005735957,0.00037020896,0.0006047756,0.00013584696],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012200588,0.0010763099,0.00080365775,0.0011639196,0.00053091446,0.0021596209,0.0019164426,0.0008642544,0.015714856],"category_scores_gemma":[0.0025627958,0.00058938965,0.00038345513,0.0019537385,0.00032772735,0.0022066378,0.0030452644,0.0010650058,0.004429162],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048954965,0.0007393653,0.0021698372,0.00030896228,0.00009852235,0.00031838455,0.00059694547,0.04592072,0.056038093,0.015918614,0.07996998,0.797431],"study_design_scores_gemma":[0.00020476348,0.0003877105,0.0043905023,0.0001315442,0.00013675017,0.00037443722,0.0006189941,0.6794851,0.09002211,0.017787667,0.20630185,0.00015870105],"about_ca_topic_score_codex":0.0030158109,"about_ca_topic_score_gemma":0.004734324,"teacher_disagreement_score":0.015714856,"about_ca_system_score_codex":0.00033824955,"about_ca_system_score_gemma":0.0009246195,"threshold_uncertainty_score":0.052571416},"labels":[],"label_agreement":null},{"id":"W4385859504","doi":"10.1007/978-3-031-34593-7_10","title":"Adoption and Implementation of Common Data Environments in the Province of Quebec: Barriers, Challenges, and Trends","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Operationalization; Asset (computer security); Work (physics); Software deployment; Confusion; Scale (ratio); Knowledge management; Computer science; Frame (networking); Process management; Management science; Data science; Engineering; Computer security; Geography; Software engineering; Psychology","score_opus":0.015443199993396082,"score_gpt":0.22395950527346617,"score_spread":0.2085163052800701,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859504","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9092705,0.00581092,0.0028014432,0.031532943,0.00019812655,0.00028749875,0.004389367,0.00028475994,0.045424324],"genre_scores_gemma":[0.97816145,0.0022415128,0.0023934145,0.0011072287,0.000015245825,0.00010869334,0.0014143807,0.000047830614,0.014510231],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9938403,0.0008667183,0.0003041229,0.00058791414,0.0027461892,0.0016548971],"domain_scores_gemma":[0.9801471,0.003260323,0.0016452519,0.000554253,0.0106245205,0.003768523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046720356,0.00026969996,0.00041400045,0.0017909381,0.0049209245,0.0063331304,0.0027313433,0.0008232053,0.0036752773],"category_scores_gemma":[0.014332785,0.00038436282,0.00045771146,0.0074295686,0.0028854844,0.0026942,0.0027051766,0.0015683135,0.00027846976],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021315466,0.0004116406,0.51823527,0.000699792,0.00013018172,0.0008776257,0.059959248,0.0040114955,0.00266581,0.02796764,0.04346042,0.34136772],"study_design_scores_gemma":[0.000037496433,0.00015815822,0.78231466,0.0009173552,0.00006178639,0.0002020707,0.080517955,0.0043756305,0.0009092836,0.00097513426,0.12940197,0.00012853672],"about_ca_topic_score_codex":0.9974389,"about_ca_topic_score_gemma":0.9979017,"teacher_disagreement_score":0.10104778,"about_ca_system_score_codex":0.10104778,"about_ca_system_score_gemma":0.20055002,"threshold_uncertainty_score":0.7331563},"labels":[],"label_agreement":null},{"id":"W4385859505","doi":"10.1007/978-3-031-34593-7_39","title":"Overcoming Obstacles in BIM-Based Multidisciplinary Coordination: A Literature Overview","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Multidisciplinary approach; Scope (computer science); Context (archaeology); Process (computing); Process management; Knowledge management; Situational ethics; Task (project management); Work (physics); Computer science; Management science; Engineering; Systems engineering; Political science; Geography","score_opus":0.014561590291603636,"score_gpt":0.22303084600582035,"score_spread":0.2084692557142167,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859505","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0036742664,0.8756803,0.052212514,0.0042657875,0.0011882532,0.00008429948,0.000072455055,0.00012727287,0.062694766],"genre_scores_gemma":[0.0469759,0.9023723,0.038293272,0.0012517507,0.00094193313,0.00014091014,0.00022069999,0.00005362949,0.009749635],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981331,0.00063585385,0.00014287943,0.00022271049,0.0006961246,0.00016930467],"domain_scores_gemma":[0.99704295,0.0020969477,0.00019291439,0.000102635415,0.00049086177,0.00007370595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027156323,0.0008853058,0.0008226897,0.0050629256,0.0010494931,0.005975312,0.0023753513,0.0027731853,0.0049649766],"category_scores_gemma":[0.0041505224,0.0007588486,0.0005100075,0.014562248,0.0019689295,0.005955006,0.0033916284,0.001894447,0.0016143833],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025083964,0.00013451632,0.0007261779,0.010943434,0.000049800477,0.00030385604,0.0020480053,0.0039702435,0.00055886107,0.1596817,0.01879397,0.80276436],"study_design_scores_gemma":[0.000007911278,0.00006909339,0.0021096827,0.020358114,0.000095058065,0.0014111735,0.0055473377,0.006113672,0.0011884054,0.08551795,0.87752354,0.0000581539],"about_ca_topic_score_codex":0.0023059489,"about_ca_topic_score_gemma":0.0036004062,"teacher_disagreement_score":0.005975312,"about_ca_system_score_codex":0.001687975,"about_ca_system_score_gemma":0.002961767,"threshold_uncertainty_score":0.01660949},"labels":[],"label_agreement":null},{"id":"W4385859536","doi":"10.1007/978-3-031-34593-7_24","title":"Considerations for Site Layout Planning Decision-Making","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Sophistication; Process (computing); Task (project management); Set (abstract data type); Coding (social sciences); Computer science; Engineering; Management science; Process management; Systems engineering","score_opus":0.01649291157112646,"score_gpt":0.23535818400587338,"score_spread":0.21886527243474693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859536","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008645852,0.0053954315,0.6722464,0.010677047,0.0008800764,0.00019169974,0.0003275278,0.00030402327,0.3013319],"genre_scores_gemma":[0.40367752,0.0065546674,0.5039896,0.0012567108,0.00081101205,0.00037079176,0.0005662144,0.00053368096,0.08223985],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.997218,0.001447395,0.00009018534,0.0001570733,0.0009086533,0.00017863017],"domain_scores_gemma":[0.99447966,0.004075163,0.00015284827,0.00022554123,0.00085083186,0.0002159325],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003920862,0.0011162811,0.001182749,0.0015785829,0.00197353,0.0069554015,0.002293265,0.002619711,0.039744947],"category_scores_gemma":[0.012171019,0.001292378,0.00089003117,0.0025537433,0.0014138308,0.005155435,0.0017060392,0.0034968806,0.00476801],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000097716074,0.000113928334,0.00059883477,0.00051327795,0.00005196714,0.0004150959,0.00055724726,0.17243136,0.0016877966,0.5665382,0.029820757,0.2271738],"study_design_scores_gemma":[0.00002097353,0.00007813046,0.00084851997,0.0005735078,0.00006497114,0.00028359587,0.0012492132,0.12811312,0.0011472645,0.7701298,0.09743093,0.000059930586],"about_ca_topic_score_codex":0.007856175,"about_ca_topic_score_gemma":0.024341932,"teacher_disagreement_score":0.039744947,"about_ca_system_score_codex":0.0028434182,"about_ca_system_score_gemma":0.0028440969,"threshold_uncertainty_score":0.13296008},"labels":[],"label_agreement":null},{"id":"W4385859679","doi":"10.1007/978-3-031-34593-7_4","title":"Virtual Reality-Based Expert Demonstrations for Training Construction Robots via Imitation Learning","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Robot; Task (project management); Human–computer interaction; Computer science; Reinforcement learning; Control (management); Artificial intelligence; Engineering; Systems engineering","score_opus":0.024848157207348048,"score_gpt":0.23021523026941215,"score_spread":0.20536707306206411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859679","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08310434,0.0005856971,0.89141506,0.00013140905,0.00008706307,0.00010786357,0.00011982047,0.0023762826,0.022072386],"genre_scores_gemma":[0.7228571,0.00047128374,0.25459594,0.000067918685,0.000022852744,0.00024013406,0.00025427077,0.00019904698,0.021291438],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979895,0.00006296386,0.000009859382,0.000042559703,0.000064680644,0.000020902848],"domain_scores_gemma":[0.99960583,0.00024777334,0.00002179423,0.00005713131,0.00004269334,0.00002482678],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003479296,0.000546989,0.00046006482,0.00020314883,0.00017178353,0.00042436263,0.0010114812,0.0007846536,0.011484279],"category_scores_gemma":[0.0011542558,0.00036824896,0.00029381036,0.00016404338,0.00037879893,0.0006947827,0.0010360576,0.0006760744,0.0013780441],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043956222,0.00046340853,0.00041504274,0.0003827232,0.000056439105,0.00042076735,0.0004314169,0.34853083,0.1375006,0.009662198,0.00577159,0.4959254],"study_design_scores_gemma":[0.000062029605,0.00050588435,0.0013955504,0.000050918483,0.000021176404,0.00036226655,0.000083281666,0.95470357,0.029120546,0.0051301965,0.008521909,0.000042646596],"about_ca_topic_score_codex":0.0013743581,"about_ca_topic_score_gemma":0.0023141582,"teacher_disagreement_score":0.011484279,"about_ca_system_score_codex":0.0001898906,"about_ca_system_score_gemma":0.00021016785,"threshold_uncertainty_score":0.03841871},"labels":[],"label_agreement":null},{"id":"W4385859707","doi":"10.1007/978-3-031-34593-7_30","title":"Axiomatic Design-Based Optimization Framework for Factory Logistics Design in Precast Concrete Construction","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Precast concrete; Factory (object-oriented programming); Axiomatic design; Engineering; Production (economics); Manufacturing engineering; Construction engineering; Materials management; Computer science; Systems engineering; Lean manufacturing; Civil engineering; Operations management","score_opus":0.029998911942959512,"score_gpt":0.21944318824480216,"score_spread":0.18944427630184266,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859707","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0010129652,0.00009309601,0.99378645,0.00007801508,0.000017684648,0.00002574289,0.000047341648,0.000074386306,0.0048641693],"genre_scores_gemma":[0.07945198,0.0003065415,0.9124994,0.00009957547,0.000041740383,0.00023181573,0.0003329889,0.00010116863,0.006934752],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989672,0.00040739373,0.00006542394,0.00013243,0.00037472893,0.00005282532],"domain_scores_gemma":[0.9995746,0.0001777538,0.000027738019,0.000059956936,0.0001412018,0.000018707724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014643812,0.0008697216,0.00091873924,0.00084028667,0.00069146114,0.0017581142,0.0021697187,0.0008720697,0.0056813583],"category_scores_gemma":[0.0014907129,0.0006972828,0.0014124634,0.0011695275,0.0013199445,0.0015538083,0.0016611954,0.0019078121,0.0011121035],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023441768,0.000057246943,0.00015139395,0.00016189822,0.000026993923,0.00008071341,0.00010186545,0.26260006,0.0016994625,0.6889408,0.0023390644,0.043817077],"study_design_scores_gemma":[0.000018337678,0.000034759127,0.0000977665,0.000043092215,0.000027256434,0.000058989957,0.000043247135,0.7165286,0.00081174914,0.26655647,0.015764771,0.000014999957],"about_ca_topic_score_codex":0.0038027416,"about_ca_topic_score_gemma":0.00614455,"teacher_disagreement_score":0.0056813583,"about_ca_system_score_codex":0.0013097067,"about_ca_system_score_gemma":0.0016767852,"threshold_uncertainty_score":0.019006073},"labels":[],"label_agreement":null},{"id":"W4385859750","doi":"10.1007/978-3-031-34593-7_41","title":"Role of Electronic Document Management Systems in the Design Change Management Process","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Document management system; Traceability; Process (computing); Computer science; Process management; Change control; Engineering management; Engineering; Software engineering; Database; Control (management)","score_opus":0.010247605893592316,"score_gpt":0.1965011723764191,"score_spread":0.1862535664828268,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859750","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.022765901,0.018161736,0.3177121,0.0069171386,0.0015053664,0.00019585449,0.00019513762,0.0015460658,0.63100064],"genre_scores_gemma":[0.24159344,0.020944338,0.36581448,0.0015439219,0.0010207129,0.00033420985,0.0006435852,0.000847849,0.36725754],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9973563,0.0010358695,0.00015770152,0.00020112419,0.0011000551,0.00014912126],"domain_scores_gemma":[0.99434584,0.004021031,0.0002259425,0.00073146535,0.00051679654,0.00015892735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004896664,0.000505477,0.0003630683,0.0017857228,0.0010094604,0.0115882205,0.0014484118,0.0016685923,0.017086871],"category_scores_gemma":[0.007358027,0.00049616455,0.0003375381,0.002792987,0.0016462274,0.0074338177,0.0018782538,0.0021323338,0.004440021],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000717572,0.0001583066,0.0005910007,0.00033748956,0.00001774962,0.00015532167,0.0019155199,0.003185321,0.0033761493,0.27431038,0.017307786,0.6985732],"study_design_scores_gemma":[0.000045728153,0.00017743077,0.0013518932,0.000997543,0.000054902936,0.00053278706,0.0012145487,0.01800066,0.011185928,0.11052742,0.8558566,0.00005475318],"about_ca_topic_score_codex":0.0014223753,"about_ca_topic_score_gemma":0.0014870493,"teacher_disagreement_score":0.017086871,"about_ca_system_score_codex":0.0016527687,"about_ca_system_score_gemma":0.0022291234,"threshold_uncertainty_score":0.05716127},"labels":[],"label_agreement":null},{"id":"W4385859875","doi":"10.1007/978-3-031-34593-7_21","title":"Pull-Based Simulation Modelling for Modular Construction Supply Chain Analysis: A Case Study in Northern Canada","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick; University of Toronto","funders":"","keywords":"Modular design; Supply chain; Factory (object-oriented programming); Schedule; General partnership; Scheduling (production processes); Operations research; Work (physics); Engineering; Computer science; Operations management; Industrial engineering; Business; Marketing; Finance; Mechanical engineering","score_opus":0.012021091295034194,"score_gpt":0.20301764813196013,"score_spread":0.19099655683692593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385859875","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.925945,0.00018799865,0.04474364,0.0002928623,0.000020034511,0.00012587625,0.00074195524,0.00034364543,0.027598983],"genre_scores_gemma":[0.9748199,0.00016673167,0.012610961,0.00001769432,0.0000023142948,0.00004759349,0.00033380874,0.00007913046,0.011921881],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99977523,0.000041745003,0.000009902096,0.00003185666,0.00007126859,0.000070069786],"domain_scores_gemma":[0.99950266,0.00024212204,0.000023304456,0.00002403294,0.0001677796,0.000040034443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00053699454,0.0007163867,0.0006309797,0.0005828561,0.0023303884,0.0024781725,0.0014165262,0.0011694991,0.004765569],"category_scores_gemma":[0.0009868757,0.0004966867,0.00074479054,0.001530565,0.0010645088,0.00075900194,0.00083610223,0.0006736308,0.0003536489],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008900142,0.000070342154,0.005088785,0.000040514708,0.000015700381,0.00023477503,0.00049427693,0.9791083,0.0012223839,0.0048604556,0.00061146717,0.008163943],"study_design_scores_gemma":[0.000010114656,0.000020729281,0.0015189844,0.000008355019,0.000010228089,0.000014901709,0.0006325008,0.99523634,0.00054898846,0.0008416543,0.0011439933,0.000013249721],"about_ca_topic_score_codex":0.92236745,"about_ca_topic_score_gemma":0.9123493,"teacher_disagreement_score":0.07763255,"about_ca_system_score_codex":0.011644216,"about_ca_system_score_gemma":0.012451037,"threshold_uncertainty_score":0.15617943},"labels":[],"label_agreement":null},{"id":"W4385868267","doi":"10.59962/9780774850513-009","title":"The Culture of Construction: Or, Etiquette for the Nontraditional","year":2007,"lang":"en","type":"book-chapter","venue":"University of British Columbia Press eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Simon Fraser University","keywords":"Etiquette; History; Sociology; Philosophy; Linguistics","score_opus":0.015764340648727507,"score_gpt":0.17500422848657057,"score_spread":0.15923988783784307,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4385868267","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007182185,0.04279394,0.011148093,0.04845957,0.00559531,0.000047694422,0.000031686188,0.00016095163,0.8845806],"genre_scores_gemma":[0.4366994,0.028640078,0.007204,0.013893639,0.0028915158,0.00024078092,0.00009130272,0.00093644427,0.5094029],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99437547,0.0029144152,0.00018936628,0.00038822787,0.0014144013,0.0007180344],"domain_scores_gemma":[0.9975182,0.0009052218,0.00018019961,0.00034634557,0.0005752384,0.00047496383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00497689,0.0012079921,0.0009075432,0.0022149696,0.014882464,0.022526942,0.0016756554,0.0045813886,0.01319833],"category_scores_gemma":[0.0061166706,0.0006346409,0.0004486666,0.0045748693,0.0360943,0.01596512,0.0073885745,0.011181769,0.002768366],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008590297,0.00002127496,0.00007259204,0.000043242766,0.0000015167865,0.000025735635,0.0255077,0.000030912495,0.000058246966,0.933393,0.025221517,0.015615787],"study_design_scores_gemma":[0.000009367974,0.000017103215,0.00031919408,0.00041522112,0.000005149195,0.00012855188,0.029246964,0.00017998899,0.00014932588,0.13578458,0.8337245,0.000019998966],"about_ca_topic_score_codex":0.024246465,"about_ca_topic_score_gemma":0.049991332,"teacher_disagreement_score":0.024246465,"about_ca_system_score_codex":0.009688633,"about_ca_system_score_gemma":0.014955788,"threshold_uncertainty_score":0.07029629},"labels":[],"label_agreement":null},{"id":"W4386268037","doi":"10.1007/978-3-031-32515-1_5","title":"Modeling Drywall Construction Process Using a Spatiotemporal Chronographical Scheduling","year":2023,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Scheduling (production processes); Gantt chart; Computer science; Process (computing); Operations research; Partition (number theory); Engineering; Industrial engineering; Systems engineering; Operations management; Mathematics","score_opus":0.015922947689958968,"score_gpt":0.21907457338197722,"score_spread":0.20315162569201825,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386268037","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20471708,0.00044715218,0.7780422,0.00018985932,0.00013564597,0.0001043508,0.0011205942,0.001340505,0.013902637],"genre_scores_gemma":[0.90096486,0.0004430884,0.089916475,0.000028823346,0.000029692364,0.00011125704,0.00079610955,0.00015706975,0.007552661],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99984145,0.000026652047,0.000011540804,0.000054656368,0.000035366185,0.000030238767],"domain_scores_gemma":[0.99971586,0.00014015324,0.00004114603,0.000029448009,0.00004864035,0.00002483065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034311088,0.0004225393,0.00063944916,0.00065776054,0.0004637321,0.0011426362,0.0011928924,0.0007371475,0.0048120148],"category_scores_gemma":[0.0007667099,0.00044603428,0.00083290605,0.0011409139,0.00040297527,0.0008610582,0.00054090435,0.00041937397,0.0004997632],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022480948,0.000014517421,0.00046681604,0.000011348817,0.0000058553683,0.000031447984,0.000012305569,0.9927456,0.00044345655,0.0027186403,0.00012745413,0.0033999959],"study_design_scores_gemma":[0.0000023585076,0.000002895994,0.000090487825,8.8116616e-7,0.0000028982763,0.000003512712,0.0000048149996,0.99897623,0.00012958545,0.00057540217,0.00020902754,0.0000018501725],"about_ca_topic_score_codex":0.032748964,"about_ca_topic_score_gemma":0.021021178,"teacher_disagreement_score":0.032748964,"about_ca_system_score_codex":0.000809901,"about_ca_system_score_gemma":0.0013229417,"threshold_uncertainty_score":0.0651167},"labels":[],"label_agreement":null},{"id":"W4386432481","doi":"10.1007/978-981-19-9822-5_53","title":"Optimizing Prefabrication of Plumbing Systems for Residential Buildings from Remote High North Communities by Considering All Three Facets of Sustainable Development","year":2023,"lang":"en","type":"book-chapter","venue":"Environmental science and engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval","funders":"","keywords":"Prefabrication; Fuzzy logic; Sustainable development; Engineering; Computer science; Civil engineering; Architectural engineering","score_opus":0.011181160301071087,"score_gpt":0.17039944826572784,"score_spread":0.15921828796465676,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386432481","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.50086075,0.00087242504,0.38519606,0.00016062734,0.00007707645,0.00019985001,0.0002629143,0.00086372596,0.11150656],"genre_scores_gemma":[0.8553841,0.0004191326,0.11835063,0.000030036283,0.0000099783165,0.00005548377,0.0003022586,0.0002375448,0.025210787],"study_design_codex":"bench_or_experimental","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9997358,0.000024353027,0.0000072527596,0.000029653249,0.00015427312,0.00004878292],"domain_scores_gemma":[0.99988043,0.000028142169,0.000016660442,0.000020068866,0.000047734815,0.000006970666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002311681,0.0006155983,0.00026066566,0.0003301323,0.00059143605,0.00080100045,0.000584879,0.00038643437,0.0053676735],"category_scores_gemma":[0.0004584278,0.00030483207,0.00028992302,0.00042653058,0.00017713335,0.0006343711,0.00042034275,0.00053080416,0.00092268555],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000942217,0.00021750029,0.005347166,0.00045766513,0.00002205384,0.00025380272,0.0005601356,0.20410253,0.4076069,0.0063877935,0.004016987,0.3709332],"study_design_scores_gemma":[0.000030085197,0.0012706734,0.075000696,0.0001485319,0.00012012156,0.0013895768,0.0027988588,0.43994856,0.38171855,0.012883916,0.08458916,0.00010134068],"about_ca_topic_score_codex":0.0031558073,"about_ca_topic_score_gemma":0.017113263,"teacher_disagreement_score":0.0053676735,"about_ca_system_score_codex":0.0004895878,"about_ca_system_score_gemma":0.00061488204,"threshold_uncertainty_score":0.017956614},"labels":[],"label_agreement":null},{"id":"W4386460268","doi":"10.1007/s41693-023-00112-8","title":"Improving autonomous robotic navigation using IFC files","year":2023,"lang":"en","type":"article","venue":"Construction Robotics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Tamkeen; York University; New York University Abu Dhabi","keywords":"Waypoint; Computer science; Semantic mapping; Process (computing); JSON; Simultaneous localization and mapping; Building information modeling; Robot; CityGML; Schedule; Artificial intelligence; Real-time computing; Human–computer interaction; Mobile robot; Database; Engineering; Visualization; Operating system","score_opus":0.015868713293266414,"score_gpt":0.22335580328053672,"score_spread":0.2074870899872703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386460268","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13246863,0.000229097,0.7884026,0.00037124884,0.00019160326,0.00030024102,0.0037887085,0.059044298,0.015203487],"genre_scores_gemma":[0.3865955,0.00018404119,0.5966733,0.00008402581,0.00002819189,0.0002473026,0.008003856,0.0026547718,0.005529027],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9992849,0.000097443975,0.000032320477,0.00010072989,0.0004203392,0.00006431127],"domain_scores_gemma":[0.9979955,0.0005038883,0.00009483794,0.0005966032,0.0007697086,0.000039432103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006727092,0.00080552074,0.00034118575,0.0014505293,0.000525219,0.0009558498,0.0011511687,0.0005098962,0.006278334],"category_scores_gemma":[0.0034946618,0.0002283355,0.00041070092,0.0011618985,0.00032296503,0.0013852721,0.0010610982,0.0004261853,0.0029018924],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006188625,0.00038187893,0.007184191,0.00039839995,0.000050336344,0.00060832535,0.00091636216,0.12000102,0.06831208,0.0090102805,0.030756015,0.7617623],"study_design_scores_gemma":[0.00010155587,0.00023615915,0.0077475156,0.00013874253,0.000064893495,0.00058064185,0.00075690734,0.6170671,0.23322259,0.005166208,0.1347839,0.00013382267],"about_ca_topic_score_codex":0.009553044,"about_ca_topic_score_gemma":0.0065628663,"teacher_disagreement_score":0.009553044,"about_ca_system_score_codex":0.00059541897,"about_ca_system_score_gemma":0.00063807575,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4386494210","doi":"10.32920/24101475","title":"Material Innovations: Transparent, lightweight, malleable &amp; responsive","year":2023,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Software portability; Architecture; Systems engineering; Computer science; Generator (circuit theory); Architectural engineering; Software engineering; Construction engineering; Manufacturing engineering; Engineering; Operating system","score_opus":0.055105415571436105,"score_gpt":0.2640754225889942,"score_spread":0.20897000701755808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386494210","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04194052,0.007929617,0.21176678,0.022339016,0.0030555804,0.00021773519,0.0001257499,0.0009675426,0.7116576],"genre_scores_gemma":[0.68596554,0.0064276615,0.10309632,0.0052796365,0.0012242991,0.0003899477,0.0001022066,0.000504402,0.19701003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9985202,0.0002835605,0.000055421777,0.00018645579,0.0008189804,0.00013543993],"domain_scores_gemma":[0.9992268,0.0002469122,0.00012669894,0.00017952782,0.00012268164,0.00009728937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014236729,0.0004848731,0.0002125071,0.00081504707,0.00087721663,0.005506244,0.0007551134,0.0028418663,0.008689559],"category_scores_gemma":[0.0028671992,0.00031826796,0.000336151,0.0005806086,0.0066936244,0.006449945,0.003030437,0.0024452563,0.002597022],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030664018,0.00003189076,0.00014674394,0.00016710265,0.0000040805458,0.00018381047,0.001161395,0.00045276314,0.006767683,0.9422062,0.0067233634,0.042124353],"study_design_scores_gemma":[0.000026819309,0.0001517089,0.0011866997,0.00022937813,0.000022391196,0.0010770322,0.0015464653,0.0032574402,0.019733313,0.47402206,0.4986958,0.00005080352],"about_ca_topic_score_codex":0.00030711232,"about_ca_topic_score_gemma":0.000392527,"teacher_disagreement_score":0.008689559,"about_ca_system_score_codex":0.001159635,"about_ca_system_score_gemma":0.00058412325,"threshold_uncertainty_score":0.029069424},"labels":[],"label_agreement":null},{"id":"W4386523763","doi":"10.32920/24101475.v1","title":"Material Innovations: Transparent, lightweight, malleable &amp; responsive","year":2023,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Software portability; Architecture; Systems engineering; Computer science; Generator (circuit theory); Architectural engineering; Software engineering; Construction engineering; Engineering management; Engineering; Operating system","score_opus":0.055105415571436105,"score_gpt":0.2640754225889942,"score_spread":0.20897000701755808,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386523763","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04194052,0.007929617,0.21176678,0.022339016,0.0030555804,0.00021773519,0.0001257499,0.0009675426,0.7116576],"genre_scores_gemma":[0.68596554,0.0064276615,0.10309632,0.0052796365,0.0012242991,0.0003899477,0.0001022066,0.000504402,0.19701003],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985202,0.0002835605,0.000055421777,0.00018645579,0.0008189804,0.00013543993],"domain_scores_gemma":[0.9992268,0.0002469122,0.00012669894,0.00017952782,0.00012268164,0.00009728937],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014236729,0.0004848731,0.0002125071,0.00081504707,0.00087721663,0.005506244,0.0007551134,0.0028418663,0.008689559],"category_scores_gemma":[0.0028671992,0.00031826796,0.000336151,0.0005806086,0.0066936244,0.006449945,0.003030437,0.0024452563,0.002597022],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030664018,0.00003189076,0.00014674394,0.00016710265,0.0000040805458,0.00018381047,0.001161395,0.00045276314,0.006767683,0.9422062,0.0067233634,0.042124353],"study_design_scores_gemma":[0.000026819309,0.0001517089,0.0011866997,0.00022937813,0.000022391196,0.0010770322,0.0015464653,0.0032574402,0.019733313,0.47402206,0.4986958,0.00005080352],"about_ca_topic_score_codex":0.00030711232,"about_ca_topic_score_gemma":0.000392527,"teacher_disagreement_score":0.008689559,"about_ca_system_score_codex":0.001159635,"about_ca_system_score_gemma":0.00058412325,"threshold_uncertainty_score":0.029069424},"labels":[],"label_agreement":null},{"id":"W4386647162","doi":"10.4322/1809-7197.2023.111.0004","title":"Coretec Tools Concreto Armado : Uma plataforma online para auxílio no projeto de vigas de concreto armado conforme as prescrições da NBR 6118","year":2023,"lang":"pt","type":"article","venue":"CONCRETO & Construções","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ford Motor Company (Canada)","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.0416090316873835,"score_gpt":0.2900027133878326,"score_spread":0.24839368170044912,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386647162","genre_codex":"methods","genre_gemma":"software","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"software","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10452834,0.00020997488,0.73043287,0.00081297476,0.00014913622,0.0018750586,0.0030196488,0.058765534,0.10020651],"genre_scores_gemma":[0.3803638,0.00031078822,0.5360088,0.00029674204,0.000049682214,0.0018224433,0.0071839257,0.010164846,0.06379892],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.996682,0.0007138132,0.00029907198,0.0004045238,0.0016694806,0.00023114856],"domain_scores_gemma":[0.99224925,0.0027099303,0.00045179416,0.0027871458,0.0013626834,0.00043925198],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004630784,0.00074360543,0.0003486164,0.0018241223,0.0009450737,0.0028481078,0.0013236325,0.0010455527,0.017243521],"category_scores_gemma":[0.011678329,0.0007778906,0.0005397095,0.00095669896,0.0009987697,0.0040529557,0.0037502649,0.0014750101,0.005780463],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00089656556,0.0013206312,0.0095685655,0.0007916163,0.00006834693,0.0007076007,0.009427435,0.011636312,0.06472364,0.05201466,0.045977727,0.80286694],"study_design_scores_gemma":[0.0002772537,0.0010471811,0.0173368,0.00086601276,0.00014120682,0.0014221154,0.0033807193,0.16465427,0.07932181,0.033710618,0.69752693,0.0003151043],"about_ca_topic_score_codex":0.004130428,"about_ca_topic_score_gemma":0.008498328,"teacher_disagreement_score":0.017243521,"about_ca_system_score_codex":0.00078891625,"about_ca_system_score_gemma":0.0026307292,"threshold_uncertainty_score":0.057685375},"labels":[],"label_agreement":null},{"id":"W4386698028","doi":"10.1139/cjce-2023-0184","title":"Measuring the value and cost of BIM use—an empirical lesson learned from Taiwan’s social housing projects","year":2023,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Process (computing); Analytic hierarchy process; Cost estimate; Empirical research; Process management; Prioritization; Computer science; Value engineering; Risk analysis (engineering); Business; Operations research; Operations management; Systems engineering; Engineering","score_opus":0.06180903546058785,"score_gpt":0.23859208763710504,"score_spread":0.17678305217651719,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386698028","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9974999,0.00002926536,0.0010498436,0.0001288155,0.0000014828198,0.000018043595,0.000016007507,0.0000019376096,0.0012549061],"genre_scores_gemma":[0.99714977,0.000076923934,0.0023978893,0.00001661377,0.000002215239,0.000028770262,0.000034719553,0.0000042671113,0.00028875718],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99548703,0.002625485,0.00021835238,0.00028314165,0.0011516066,0.00023442952],"domain_scores_gemma":[0.9803182,0.0142607,0.0015508961,0.00089602807,0.0026878782,0.00028640582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007170938,0.00048047834,0.00030549132,0.0019200386,0.0009558011,0.0014481926,0.0008113385,0.0006706492,0.00068752345],"category_scores_gemma":[0.026312673,0.00039357916,0.00026805952,0.002484522,0.0017205743,0.0027393925,0.0016247985,0.0009102486,0.000087148],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012487658,0.0011112939,0.7530566,0.00031576437,0.00009036824,0.0014345535,0.07973061,0.007171981,0.002717827,0.006988593,0.001323274,0.14593433],"study_design_scores_gemma":[0.000028580369,0.0009571236,0.73603725,0.00038619616,0.000104193285,0.0007842329,0.20590249,0.0339336,0.005886385,0.006449599,0.009403215,0.00012715568],"about_ca_topic_score_codex":0.0210999,"about_ca_topic_score_gemma":0.046536386,"teacher_disagreement_score":0.0210999,"about_ca_system_score_codex":0.0028349657,"about_ca_system_score_gemma":0.0020787467,"threshold_uncertainty_score":0.04195416},"labels":[],"label_agreement":null},{"id":"W4386698635","doi":"10.3389/fbuil.2023.1256921","title":"A graph-based explanatory model for room-based energy efficiency analysis based on BIM data","year":2023,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lassonde Industries (Canada); York University","funders":"Natural Sciences and Engineering Research Council of Canada; York University","keywords":"Interpretability; Building information modeling; Computer science; Energy consumption; Transparency (behavior); Graph; Data mining; Energy modeling; Building model; Model building; Machine learning; Engineering; Theoretical computer science; Simulation","score_opus":0.01789370039520526,"score_gpt":0.21021759885234637,"score_spread":0.1923238984571411,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386698635","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044314682,0.00022298428,0.94929075,0.0007158985,0.000049786795,0.00006839818,0.0010362654,0.00072573614,0.0035755676],"genre_scores_gemma":[0.87346447,0.0005315185,0.115541704,0.00015088239,0.000059722362,0.00028954956,0.002009535,0.0001578165,0.0077947457],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996176,0.000094375355,0.00001552757,0.00016040979,0.00007255351,0.00003952664],"domain_scores_gemma":[0.9992243,0.00044190968,0.00011259806,0.00006177401,0.00012645358,0.000032893236],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080286124,0.0007337959,0.0005000581,0.001577824,0.0003777173,0.0010633771,0.0018471254,0.0010738325,0.005140611],"category_scores_gemma":[0.0025488725,0.00039963768,0.0010800445,0.0014983553,0.000671504,0.0016895642,0.0008533416,0.0010565036,0.00073256274],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043957414,0.000046674853,0.0045330226,0.000044632357,0.0000399484,0.00011044508,0.00008847048,0.9388545,0.0004969588,0.03021065,0.0011244564,0.02440623],"study_design_scores_gemma":[0.000002271969,0.000007624908,0.0004517042,0.000005829323,0.000010478441,0.000015474941,0.000010456738,0.9905008,0.00008444661,0.008252613,0.00065312657,0.000005175257],"about_ca_topic_score_codex":0.014601798,"about_ca_topic_score_gemma":0.017374761,"teacher_disagreement_score":0.014601798,"about_ca_system_score_codex":0.0012445718,"about_ca_system_score_gemma":0.0009067468,"threshold_uncertainty_score":0.029033601},"labels":[],"label_agreement":null},{"id":"W4386746109","doi":"10.1201/9781003323020-220","title":"Integrating unstructured data analytics and BIM to support predictive maintenance","year":2023,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Analytics; Computer science; Predictive analytics; Predictive maintenance; Data science; Engineering; Reliability engineering","score_opus":0.03128429033580181,"score_gpt":0.23406441892846272,"score_spread":0.20278012859266092,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386746109","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014372803,0.000829628,0.922781,0.0009739822,0.00014795877,0.00016026759,0.0020612185,0.0074563376,0.0512168],"genre_scores_gemma":[0.16751435,0.0015740558,0.8037479,0.00025968338,0.00014555504,0.00013404683,0.006819793,0.0007919629,0.019012697],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99957055,0.0000750153,0.000021215916,0.000070315546,0.00024491496,0.00001800793],"domain_scores_gemma":[0.99896634,0.0005507552,0.00005602014,0.00020366667,0.0001959725,0.00002727185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007181146,0.0007364984,0.00032441202,0.002958392,0.00032738477,0.0024234531,0.0010485972,0.00047237577,0.003309461],"category_scores_gemma":[0.0022194816,0.00029404517,0.00034577976,0.0031707545,0.00045212766,0.003037968,0.0015540259,0.00078312116,0.0020105718],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004796527,0.00012321737,0.0031928886,0.00035035243,0.000043391152,0.00042139075,0.00077783555,0.04650417,0.007992292,0.06508945,0.03793944,0.83751756],"study_design_scores_gemma":[0.00001134591,0.000049393082,0.0035371305,0.0002642397,0.000034755554,0.00044270244,0.00080844807,0.5882189,0.012198211,0.15721223,0.2371661,0.00005651291],"about_ca_topic_score_codex":0.0023713366,"about_ca_topic_score_gemma":0.0047520776,"teacher_disagreement_score":0.003309461,"about_ca_system_score_codex":0.00054385595,"about_ca_system_score_gemma":0.00047703716,"threshold_uncertainty_score":0.011071265},"labels":[],"label_agreement":null},{"id":"W4386755043","doi":"10.18280/rcma.330402","title":"Enhancing the Performance and Durability of Eco-Friendly Mortar with Diss Fibers (Ampelodesmos mauritanicus)","year":2023,"lang":"fr","type":"article","venue":"Revue des composites et des matériaux avancés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Durability; Mortar; Environmentally friendly; Composite material; Materials science; Ecology; Biology","score_opus":0.018053750897232095,"score_gpt":0.2312509141705765,"score_spread":0.2131971632733444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4386755043","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99586135,0.0010278187,0.0015059457,0.000018127383,0.000014625101,0.0000071620125,0.00005075594,0.00001961659,0.0014946254],"genre_scores_gemma":[0.9935049,0.0006005134,0.0024827814,0.000017656721,0.000006848386,0.0000053154517,0.00008164105,0.0000082584465,0.0032919955],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99992955,0.000007244763,0.00000490265,0.000016559532,0.000030633997,0.000011076208],"domain_scores_gemma":[0.9999318,0.00001095003,0.000021811798,0.0000056743415,0.000017070357,0.000012719519],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00013310247,0.0003578226,0.00012256794,0.00042195423,0.00015938612,0.00024246528,0.000113211594,0.0001825531,0.00092875026],"category_scores_gemma":[0.00011964135,0.000080371996,0.00020561865,0.00017852732,0.00013688132,0.00033681036,0.00020299548,0.0002229886,0.000266179],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051681032,0.000037908823,0.0007069027,0.0000787057,0.00000558976,0.00006564809,0.000026660691,0.0001661243,0.99238056,0.00013022854,0.00002786571,0.006322161],"study_design_scores_gemma":[0.0000026676876,0.000740203,0.011023566,0.00001594631,0.000029772085,0.0002996523,0.000054420954,0.00053956045,0.98180616,0.000072070136,0.005407962,0.000007998267],"about_ca_topic_score_codex":0.00039396973,"about_ca_topic_score_gemma":0.0013376315,"teacher_disagreement_score":0.00092875026,"about_ca_system_score_codex":0.00015282647,"about_ca_system_score_gemma":0.0000824668,"threshold_uncertainty_score":0.0031070113},"labels":[],"label_agreement":null},{"id":"W4387018542","doi":"10.46354/i3m.2023.mas.007","title":"Towards an advanced work packaging simulation-based approach for industrial construction projects","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Work (physics); Computer science; Manufacturing engineering; Systems engineering; Engineering; Mechanical engineering","score_opus":0.046026911238891514,"score_gpt":0.2653810932305068,"score_spread":0.21935418199161527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387018542","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010558187,0.0001477134,0.9812445,0.00014587796,0.000027868284,0.00012216312,0.00013070805,0.0006460369,0.0069770087],"genre_scores_gemma":[0.20312005,0.0006871785,0.7897359,0.00007764043,0.000029306038,0.0006202929,0.0006163163,0.0002762948,0.0048369477],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990747,0.00041356002,0.000059050555,0.00012943603,0.00025394774,0.00006923925],"domain_scores_gemma":[0.9991417,0.00042466246,0.00008336524,0.000099379315,0.00018492971,0.000065925575],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012993452,0.0010814675,0.0010641844,0.0013315292,0.00076805684,0.0026169987,0.0025642372,0.0017884959,0.0038625873],"category_scores_gemma":[0.001779843,0.0011747361,0.001783994,0.0014487851,0.00069959677,0.001338864,0.0016616073,0.0011924981,0.00081748795],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016053275,0.00003657168,0.00039351196,0.000038961774,0.000019317738,0.00004160608,0.00009881664,0.98382425,0.0007160176,0.0076510548,0.00022380918,0.00694002],"study_design_scores_gemma":[0.000007982543,0.000010069644,0.0000954324,0.000017484248,0.000007946639,0.000012197826,0.00004038389,0.99369156,0.00026403286,0.0031744628,0.002670903,0.000007586034],"about_ca_topic_score_codex":0.019342486,"about_ca_topic_score_gemma":0.01833601,"teacher_disagreement_score":0.019342486,"about_ca_system_score_codex":0.0017802565,"about_ca_system_score_gemma":0.0029980137,"threshold_uncertainty_score":0.038459778},"labels":[],"label_agreement":null},{"id":"W4387079747","doi":"10.1016/j.inffus.2023.102026","title":"Optimization-based probabilistic decision support for assessing building information modelling (BIM) maturity considering multiple objectives","year":2023,"lang":"en","type":"article","venue":"Information Fusion","topic":"BIM and Construction Integration","field":"Engineering","cited_by":32,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"National Natural Science Foundation of China","keywords":"Computer science; Probabilistic logic; Context (archaeology); Building information modeling; Maturity (psychological); Decision support system; Life-cycle assessment; Operations research; Risk analysis (engineering); Systems engineering; Production (economics); Data mining; Operations management; Artificial intelligence; Engineering; Business","score_opus":0.0161128075763634,"score_gpt":0.23842056606240125,"score_spread":0.22230775848603784,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387079747","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051612876,0.00014767602,0.9453728,0.000147551,0.000016240343,0.000053565316,0.00015710454,0.00069841725,0.0017937548],"genre_scores_gemma":[0.8817984,0.00010404658,0.1170707,0.00004424228,0.000017718367,0.000116396026,0.00029289292,0.00006996318,0.00048556243],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99832386,0.00063337205,0.00012527028,0.0002418674,0.00052679377,0.00014887213],"domain_scores_gemma":[0.9969035,0.0019895148,0.0003988309,0.00011021135,0.0005178902,0.0000800415],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026597248,0.0011542916,0.001698935,0.0022612324,0.00043485654,0.0018791722,0.0009758375,0.0010135348,0.0016040204],"category_scores_gemma":[0.007028149,0.0007352547,0.0010974584,0.0018442351,0.0005479617,0.0017271964,0.0013378571,0.00087290467,0.0003281219],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016574144,0.00007592133,0.0014908438,0.000053001128,0.000073090654,0.000033007716,0.00003861607,0.9519983,0.0015883273,0.003029792,0.00035608615,0.041097246],"study_design_scores_gemma":[0.0000031767984,0.000011869612,0.00021330215,0.000002708887,0.000007749498,0.0000041570606,0.0000043104656,0.99841905,0.00033445886,0.0009413926,0.000053700733,0.0000041868043],"about_ca_topic_score_codex":0.008889654,"about_ca_topic_score_gemma":0.005818489,"teacher_disagreement_score":0.008889654,"about_ca_system_score_codex":0.0010768648,"about_ca_system_score_gemma":0.0015836706,"threshold_uncertainty_score":0.017675817},"labels":[],"label_agreement":null},{"id":"W4387139999","doi":"10.18280/ijsse.130402","title":"Assessing and Mitigating Seismic Risk for a Hospital Structure in Zaruma, Ecuador: A Structural and Regulatory Evaluation","year":2023,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Escuela Superior Politécnica del Litoral","keywords":"Risk analysis (engineering); Structural integrity; Seismic risk; Environmental health; Forensic engineering; Environmental planning; Business; Civil engineering; Medicine; Engineering; Environmental science; Structural engineering","score_opus":0.005772578354498063,"score_gpt":0.2395193749131737,"score_spread":0.23374679655867564,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387139999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99722797,0.00018775625,0.000589402,0.00011231289,0.0000018788879,0.00006441804,0.00007907438,0.000007905874,0.0017291803],"genre_scores_gemma":[0.9983297,0.00029566043,0.00076755433,0.000017920222,0.0000028937307,0.000041934807,0.00008024251,0.0000016940213,0.00046240585],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9993782,0.00021679528,0.000049430542,0.000055263157,0.00016227555,0.00013805456],"domain_scores_gemma":[0.99902153,0.000267223,0.00029486397,0.000033668082,0.0003186978,0.0000640002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001009659,0.0005464603,0.00020332789,0.0018655208,0.0004304057,0.0014267014,0.0007075324,0.00056987855,0.0014683407],"category_scores_gemma":[0.0034165937,0.00017523438,0.00015384937,0.0009189126,0.0005906913,0.0007109048,0.001023334,0.00021701076,0.00011063734],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054004125,0.0008680924,0.7935346,0.00076492014,0.00015623184,0.0055513666,0.004992989,0.036640428,0.014786794,0.0026814411,0.00091896823,0.138564],"study_design_scores_gemma":[0.000094567746,0.002269124,0.8930531,0.00047479713,0.00023399426,0.0009139133,0.05315131,0.036558338,0.0056282743,0.0007065901,0.0068670176,0.000048847978],"about_ca_topic_score_codex":0.021234471,"about_ca_topic_score_gemma":0.030905124,"teacher_disagreement_score":0.021234471,"about_ca_system_score_codex":0.0023590995,"about_ca_system_score_gemma":0.0013672125,"threshold_uncertainty_score":0.042221785},"labels":[],"label_agreement":null},{"id":"W4387165148","doi":"10.1007/978-3-031-35399-4","title":"Advances in Information Technology in Civil and Building Engineering","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Construction engineering; Architectural engineering; Engineering; Civil engineering; Computer science","score_opus":0.002811891208733483,"score_gpt":0.18329795868318274,"score_spread":0.18048606747444926,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387165148","genre_codex":"other","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0016307624,0.36202103,0.045277376,0.0038052022,0.0065381587,0.000043424872,0.00017359086,0.00045823725,0.5800521],"genre_scores_gemma":[0.01716271,0.33810624,0.027020548,0.001377227,0.004466746,0.000070240014,0.00049047126,0.0003610476,0.6109448],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995321,0.00005812641,0.000024021547,0.000041205574,0.0003141346,0.000030391171],"domain_scores_gemma":[0.9993857,0.00035179846,0.000018912471,0.0000673208,0.00013601835,0.000040187504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005691105,0.0011909567,0.0010257195,0.0026882936,0.0005458952,0.0037190344,0.00084808766,0.0010472514,0.034162786],"category_scores_gemma":[0.0010268277,0.00047159698,0.0004528694,0.006311128,0.0009247868,0.0058605135,0.0015050462,0.0022260477,0.017249728],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015547488,0.00006862118,0.00012273187,0.0008119473,0.000016822534,0.000081545324,0.00022867727,0.0017214671,0.0016353594,0.22844547,0.19604158,0.5708102],"study_design_scores_gemma":[0.0000033437436,0.000019966474,0.00039600616,0.00040023003,0.000010836706,0.0001680856,0.00006964897,0.0018318039,0.0004951749,0.05295886,0.94363683,0.0000092396485],"about_ca_topic_score_codex":0.0011679216,"about_ca_topic_score_gemma":0.0020530685,"teacher_disagreement_score":0.034162786,"about_ca_system_score_codex":0.0011000198,"about_ca_system_score_gemma":0.0009875402,"threshold_uncertainty_score":0.114285946},"labels":[],"label_agreement":null},{"id":"W4387308622","doi":"10.54878/s2wcrx08","title":"Implementation Of Electronic Tendering In Malaysian Construction Industry: A Case Study In The Preparation And Application Of E-Tendering","year":2023,"lang":"en","type":"article","venue":"International Journal of Automation and Digital Transformation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Procurement; Business; Productivity; E-procurement; Construction industry; Process (computing); Phase (matter); Industrial organization; Operations management; Process management; Marketing; Engineering; Computer science; Construction engineering; Economics; Economic growth","score_opus":0.008853369505192155,"score_gpt":0.28651658254894363,"score_spread":0.27766321304375147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387308622","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9922767,0.000096480646,0.0010184821,0.00027791632,0.000006900973,0.00011169836,0.000016090968,0.0000073158867,0.0061885095],"genre_scores_gemma":[0.99499124,0.00020422784,0.001776837,0.00006731708,0.000004716252,0.000032364667,0.000016416108,0.000005539969,0.0029013027],"study_design_codex":"qualitative","study_design_gemma":"case_report","domain_scores_codex":[0.99636924,0.0020094651,0.00015513918,0.00017582993,0.0005852302,0.00070518884],"domain_scores_gemma":[0.9960217,0.001919339,0.0006946958,0.00023381843,0.0005308225,0.00059964525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046564867,0.00031222324,0.00025214945,0.0007131841,0.0031383352,0.0020504596,0.0013850327,0.0018859043,0.002021447],"category_scores_gemma":[0.004238271,0.0004105976,0.00033421296,0.0011207744,0.0020383864,0.0014578924,0.0014542263,0.0012037444,0.00031862225],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015209698,0.01413218,0.20033257,0.0017960181,0.00012456716,0.12682875,0.2908056,0.0343987,0.02759544,0.03812406,0.006990591,0.2573506],"study_design_scores_gemma":[0.00021084161,0.0065166675,0.20960611,0.0009779384,0.00011701399,0.018616587,0.6216701,0.038202472,0.020144768,0.0034998667,0.080176756,0.0002608609],"about_ca_topic_score_codex":0.008820451,"about_ca_topic_score_gemma":0.024246652,"teacher_disagreement_score":0.008820451,"about_ca_system_score_codex":0.003473847,"about_ca_system_score_gemma":0.0031156628,"threshold_uncertainty_score":0.025204659},"labels":[],"label_agreement":null},{"id":"W4387309213","doi":"10.56330/kltb8950","title":"Quay Quarter Tower, Sydney – conservation, life extension and upgrade using live digital twinning","year":2023,"lang":"en","type":"article","venue":"The Structural Engineer","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Tower; Upgrade; Quarter (Canadian coin); Reuse; Intervention (counseling); Architectural engineering; Stiffness; Engineering; Civil engineering; Computer science; Structural engineering; Geography; Waste management","score_opus":0.014204379225474377,"score_gpt":0.2174068445445568,"score_spread":0.20320246531908243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387309213","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9637647,0.000091587666,0.009886536,0.00013506276,0.000019755966,0.00013379524,0.00015905529,0.00011718822,0.02569229],"genre_scores_gemma":[0.96018595,0.00007358988,0.01762195,0.00002228913,0.0000039010692,0.00004143155,0.00016447902,0.000023931818,0.021862451],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.999647,0.00004240415,0.000008681931,0.00006270012,0.00019667354,0.000042569427],"domain_scores_gemma":[0.9997149,0.000028838003,0.000025370015,0.00007341729,0.00011480886,0.00004270924],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004849129,0.00019595439,0.00014473053,0.00050886057,0.0011597511,0.00059907604,0.00045458213,0.00026387282,0.0043079737],"category_scores_gemma":[0.00055729493,0.00024573,0.00019879475,0.00044357582,0.0008144753,0.00063653995,0.0009499545,0.0003338547,0.0005229384],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015407023,0.00063506776,0.117001906,0.000503814,0.00006148415,0.0056495974,0.010808128,0.03167383,0.29587883,0.011355246,0.005592776,0.5192988],"study_design_scores_gemma":[0.00011786096,0.0054647704,0.6091139,0.00014762027,0.00008351538,0.005294339,0.009366723,0.074061215,0.1462767,0.0037210311,0.14620161,0.00015073667],"about_ca_topic_score_codex":0.042933177,"about_ca_topic_score_gemma":0.1789926,"teacher_disagreement_score":0.042933177,"about_ca_system_score_codex":0.001617385,"about_ca_system_score_gemma":0.0017636099,"threshold_uncertainty_score":0.08536655},"labels":[],"label_agreement":null},{"id":"W4387380925","doi":"10.37256/dmt.3220232944","title":"Identification and Evaluation of the Key Decision Support Factors for Selecting Off-site Construction in Canada: A Building Information Modeling (BIM)-enabled Approach","year":2023,"lang":"en","type":"article","venue":"Digital Manufacturing Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure","funders":"Mitacs","keywords":"Prefabrication; Building information modeling; Identification (biology); Engineering; Factory (object-oriented programming); Quality (philosophy); Modular design; Productivity; Weighting; Function (biology); Key (lock); Computer science; Operations management; Civil engineering","score_opus":0.01289876203755141,"score_gpt":0.21097237809386898,"score_spread":0.19807361605631757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387380925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8874527,0.02623106,0.018749319,0.0070909257,0.00011277137,0.012183537,0.004198333,0.00015279939,0.043828458],"genre_scores_gemma":[0.8964124,0.013406963,0.08296843,0.00045113894,0.0000134867205,0.002789803,0.0015128241,0.000021819991,0.0024231295],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.98054296,0.0071158865,0.0025131823,0.00084602955,0.0070230914,0.0019588876],"domain_scores_gemma":[0.92872834,0.027837371,0.005380247,0.0008066499,0.034761824,0.0024855772],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.030606436,0.001171347,0.0014080509,0.018909259,0.006572482,0.007166496,0.0019389016,0.00093101745,0.0016447392],"category_scores_gemma":[0.06033835,0.00083643576,0.001487137,0.022364547,0.0023246186,0.0023665822,0.004074723,0.001164682,0.00017602245],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074840256,0.0008107069,0.23700069,0.04093693,0.0007117592,0.0021970202,0.10195666,0.006128563,0.004555773,0.013203591,0.00652473,0.58522516],"study_design_scores_gemma":[0.0003696415,0.0012987986,0.44332013,0.03105398,0.0037007127,0.0007273687,0.39895025,0.022298947,0.0090703685,0.0042903395,0.08444832,0.0004711479],"about_ca_topic_score_codex":0.9025387,"about_ca_topic_score_gemma":0.9590681,"teacher_disagreement_score":0.09746128,"about_ca_system_score_codex":0.09206167,"about_ca_system_score_gemma":0.30469644,"threshold_uncertainty_score":0.6679573},"labels":[],"label_agreement":null},{"id":"W4387511328","doi":"10.1061/jcemd4.coeng-13019","title":"Detecting Information Bottlenecks in Architecture Engineering Construction Projects for Integrative Project Management","year":2023,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Architecture; Engineering management; Systems engineering; Construction engineering; Engineering; Project management; Process management; Knowledge management; Computer science; Software engineering; Geography","score_opus":0.005720759321602127,"score_gpt":0.19959399173186743,"score_spread":0.1938732324102653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387511328","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4348429,0.00064228027,0.55551803,0.0009839355,0.000051873623,0.0005935841,0.0008307937,0.0023434563,0.0041931276],"genre_scores_gemma":[0.8853885,0.00020774636,0.11264413,0.000039099883,0.000010041153,0.00023820758,0.0007313285,0.00008885705,0.00065202214],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9913338,0.003952068,0.00074769114,0.0016521267,0.0016625947,0.00065169984],"domain_scores_gemma":[0.9531479,0.028228333,0.007695214,0.0035285645,0.0058341706,0.0015658656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012908504,0.0015738134,0.0013784578,0.005383095,0.0011121925,0.0056026992,0.002067241,0.0018971665,0.0020612373],"category_scores_gemma":[0.052582458,0.0012071668,0.0011201389,0.0034080807,0.0011803646,0.007131139,0.0029759293,0.0016488063,0.0005679444],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007157946,0.0008909601,0.2459087,0.0009330631,0.00030573353,0.00055493816,0.0046786773,0.52911663,0.0068810387,0.016966743,0.0034901616,0.18955755],"study_design_scores_gemma":[0.000027017259,0.00020058909,0.022611154,0.00013675442,0.000085531974,0.00011952858,0.0011228082,0.96255565,0.0027082695,0.008331244,0.0020409129,0.00006054942],"about_ca_topic_score_codex":0.018763248,"about_ca_topic_score_gemma":0.014251985,"teacher_disagreement_score":0.018763248,"about_ca_system_score_codex":0.0032855587,"about_ca_system_score_gemma":0.0047704503,"threshold_uncertainty_score":0.068267524},"labels":[],"label_agreement":null},{"id":"W4387541926","doi":"10.5614/jts.2023.30.2.7","title":"Evaluasi Nilai Faktor Performa Struktur Modular Komposit dengan Dinding Internal Pelat Baja Bergelombang","year":2023,"lang":"id","type":"article","venue":"Jurnal Teknik Sipil","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute for Clinical Evaluative Sciences","funders":"","keywords":"Modular design; Structural engineering; Humanities; Mathematics; Engineering; Computer science; Operating system; Art","score_opus":0.013583091681956127,"score_gpt":0.23717522367143723,"score_spread":0.2235921319894811,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387541926","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80395776,0.0013701929,0.056660347,0.0008973081,0.00018293304,0.0007490183,0.00099961,0.000819048,0.13436377],"genre_scores_gemma":[0.95403796,0.0007448993,0.018441038,0.0001336841,0.000029220197,0.00043085695,0.0005767216,0.00019523977,0.02541042],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99646664,0.00075654313,0.00024197526,0.00047129282,0.0017571863,0.000306363],"domain_scores_gemma":[0.9879931,0.0054580006,0.0011408275,0.0010806975,0.0037743025,0.0005530826],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0043213405,0.0011722344,0.00064999366,0.0015389615,0.0012118539,0.0038401405,0.00077384413,0.00086974323,0.027692294],"category_scores_gemma":[0.0151241785,0.00046037632,0.0007781969,0.0010825446,0.0010592605,0.002788303,0.0020846436,0.0009919121,0.004433306],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019053781,0.0013054304,0.25223336,0.0038406607,0.00044169324,0.00079204637,0.029396847,0.016372427,0.045546968,0.023132263,0.0149690425,0.6100639],"study_design_scores_gemma":[0.00019761198,0.00417634,0.65680134,0.0022141342,0.0014832733,0.0013464064,0.057845052,0.0445674,0.06915405,0.025863562,0.13589355,0.00045724958],"about_ca_topic_score_codex":0.003189683,"about_ca_topic_score_gemma":0.00486298,"teacher_disagreement_score":0.027692294,"about_ca_system_score_codex":0.0015621976,"about_ca_system_score_gemma":0.0017677516,"threshold_uncertainty_score":0.09263992},"labels":[],"label_agreement":null},{"id":"W4387583965","doi":"10.1088/1755-1315/1237/1/011001","title":"Preface","year":2023,"lang":"en","type":"article","venue":"IOP Conference Series Earth and Environmental Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Engineering; Library science; Governor; Sustainability; Management; Computer science; Ecology","score_opus":0.009352343361379543,"score_gpt":0.18113925008792262,"score_spread":0.17178690672654306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387583965","genre_codex":"other","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007556897,0.008450895,0.002976284,0.018253671,0.13838728,0.00049956806,0.0058235647,0.0014357179,0.8234173],"genre_scores_gemma":[0.0039287093,0.004854418,0.0014184685,0.004094037,0.016227152,0.00023755534,0.0068550156,0.0006553583,0.9617292],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984465,0.0001646615,0.000109203385,0.0003300806,0.00074787874,0.00020177384],"domain_scores_gemma":[0.9961677,0.0003104999,0.00012544049,0.00037682624,0.002095128,0.00092433667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014630028,0.0012413888,0.0009795089,0.0022573401,0.002713465,0.007355516,0.0021185784,0.0023518396,0.60257363],"category_scores_gemma":[0.0063077323,0.00037288805,0.0007842391,0.0020480247,0.0007358277,0.0040117884,0.0031580958,0.0036268681,0.44271052],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018775381,0.000016697195,0.00006607365,0.00009788269,0.000002105021,0.00003598448,0.00005147524,0.00004324988,0.000116673145,0.0038079575,0.9609784,0.03476474],"study_design_scores_gemma":[0.0000021643189,0.000008687795,0.00015417206,0.00006842153,9.884293e-7,0.00003471421,0.00005992909,0.000020612712,0.000038187456,0.00073849875,0.9988703,0.0000032934856],"about_ca_topic_score_codex":0.0038246398,"about_ca_topic_score_gemma":0.004438548,"teacher_disagreement_score":0.60257363,"about_ca_system_score_codex":0.0021926842,"about_ca_system_score_gemma":0.0040372782,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4387682529","doi":"10.1090/gsm/237/03","title":"Variational principles and applications","year":2023,"lang":"en","type":"book-chapter","venue":"Graduate studies in mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal","funders":"","keywords":"Computer science","score_opus":0.12764960333355446,"score_gpt":0.2861148112500686,"score_spread":0.15846520791651414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387682529","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029150583,0.021270206,0.13732883,0.003605667,0.0017254407,0.000031356794,0.00023217886,0.00017063627,0.83272046],"genre_scores_gemma":[0.10460672,0.018446112,0.035676938,0.0011782686,0.0021198269,0.000107831234,0.00031788385,0.00044957118,0.83709687],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9996847,0.00008487717,0.000009508099,0.000042157844,0.00015236856,0.000026372372],"domain_scores_gemma":[0.9998709,0.000048384074,0.000005929127,0.000023538521,0.000036662223,0.000014476569],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005037832,0.00088008656,0.0008840507,0.00096020877,0.0008766864,0.0020990106,0.00084015937,0.0011582099,0.020011576],"category_scores_gemma":[0.00083340495,0.00050075573,0.00052354985,0.0010920381,0.0024054125,0.00197996,0.0015225535,0.002703294,0.0057650604],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000001569228,0.000008510515,0.000019927658,0.00003005657,0.000004166406,0.000011226628,0.000058148777,0.0010702088,0.00015283839,0.9642166,0.018208878,0.016217778],"study_design_scores_gemma":[0.0000014278847,0.0000040588184,0.00007637525,0.000029291741,0.0000021957997,0.000037383616,0.000040228046,0.0032547358,0.00009435429,0.87275875,0.12369699,0.0000042783818],"about_ca_topic_score_codex":0.0022705293,"about_ca_topic_score_gemma":0.0029511617,"teacher_disagreement_score":0.020011576,"about_ca_system_score_codex":0.001342617,"about_ca_system_score_gemma":0.0007088775,"threshold_uncertainty_score":0.066945374},"labels":[],"label_agreement":null},{"id":"W4387717795","doi":"10.5267/j.msl.2023.10.099","title":"Building information modelling (BIM) and knowledge management in implementation for con-struction projects","year":2023,"lang":"en","type":"article","venue":"Management Science Letters","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Variety (cybernetics); Deliverable; Viewpoints; Computer science; Process management; Facility management; Construction management; Risk analysis (engineering); Knowledge management; Quality (philosophy); Construction engineering; Engineering management; Systems engineering; Business; Engineering; Operations management","score_opus":0.018150292422762546,"score_gpt":0.26389844127325446,"score_spread":0.2457481488504919,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387717795","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14858729,0.015060705,0.2337566,0.048869044,0.00067526463,0.0014403063,0.0004810345,0.0009508238,0.550179],"genre_scores_gemma":[0.7884552,0.010174435,0.17528315,0.0013477752,0.000084532265,0.0009870277,0.0004524162,0.00020536277,0.023010282],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97417337,0.0157055,0.0014785334,0.0007856915,0.0064425524,0.0014142682],"domain_scores_gemma":[0.9809777,0.011451402,0.0019400233,0.0016812752,0.002881858,0.0010676817],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022905597,0.00051816046,0.0004699617,0.004643825,0.0027418113,0.011529127,0.002307998,0.0028516743,0.008306912],"category_scores_gemma":[0.034671865,0.00071706594,0.000758998,0.00913471,0.0050804056,0.012159306,0.008398475,0.0030459259,0.0013235902],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010545597,0.0006134932,0.010453095,0.0018321325,0.000078997866,0.0005264127,0.023805657,0.006079269,0.0007889864,0.34418362,0.013463451,0.5980694],"study_design_scores_gemma":[0.00007808079,0.0009245061,0.036459506,0.009165508,0.00019450096,0.0010959784,0.09548832,0.019736618,0.004768929,0.19661283,0.6351988,0.0002763741],"about_ca_topic_score_codex":0.0070161065,"about_ca_topic_score_gemma":0.009086479,"teacher_disagreement_score":0.022905597,"about_ca_system_score_codex":0.0068122856,"about_ca_system_score_gemma":0.014971876,"threshold_uncertainty_score":0.12113786},"labels":[],"label_agreement":null},{"id":"W4387734407","doi":"10.20944/preprints202310.1151.v1","title":"Data- and Knowledge-Driven Cycle Time Estimation in Offsite Construction","year":2023,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Workstation; Computer science; Estimation; Factory (object-oriented programming); Simulation; Real-time computing; Industrial engineering; Machine learning; Engineering; Operating system; Systems engineering","score_opus":0.07656687188327758,"score_gpt":0.31705645109312236,"score_spread":0.24048957920984476,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387734407","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6627244,0.00018617607,0.3334545,0.0001135266,0.000024421242,0.000061307874,0.00032916793,0.0014725471,0.0016339741],"genre_scores_gemma":[0.9564364,0.000055628832,0.042506777,0.0000118564485,0.000005537928,0.000033257875,0.00039142853,0.000055746466,0.0005032318],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994673,0.000109434564,0.000027895794,0.0001518087,0.00018815114,0.000055486726],"domain_scores_gemma":[0.99828327,0.0008476816,0.00024161066,0.00018191576,0.00037066813,0.00007487783],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001056155,0.0005147792,0.0006003058,0.0014416635,0.00030297082,0.00083348475,0.00086490734,0.00064131554,0.00073148037],"category_scores_gemma":[0.004318957,0.00041046707,0.00027505402,0.0014529485,0.00036608998,0.00076057744,0.0004908899,0.00049791305,0.0002561969],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026991256,0.00020474674,0.013902696,0.00008145707,0.000028162303,0.00009023237,0.00013255396,0.8148366,0.008355934,0.0011238615,0.00055130885,0.16042249],"study_design_scores_gemma":[0.000003891668,0.000020562493,0.0031075072,0.000003830942,0.0000032722942,0.000011689571,0.000017659851,0.99241954,0.00361211,0.0005427681,0.00024970484,0.000007501565],"about_ca_topic_score_codex":0.01665954,"about_ca_topic_score_gemma":0.01596369,"teacher_disagreement_score":0.01665954,"about_ca_system_score_codex":0.0010975427,"about_ca_system_score_gemma":0.0012501642,"threshold_uncertainty_score":0.033125103},"labels":[],"label_agreement":null},{"id":"W4387738139","doi":"10.3390/su152014991","title":"Construction Simulation and Environmental Impact Analysis: Towards a 4D-Based Analysis of Road Project Variants","year":2023,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Plan (archaeology); Schedule; Computer science; Work (physics); Impact assessment; Project planning; Environmental impact assessment; Software deployment; Project management; Scale (ratio); Environmental resource management; Risk analysis (engineering); Systems engineering; Engineering; Environmental science; Geography; Business; Software engineering","score_opus":0.008490591080027664,"score_gpt":0.275720345974769,"score_spread":0.2672297548947414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387738139","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10884412,0.0004675685,0.8696476,0.00058360456,0.00004245038,0.00036422088,0.0021055387,0.0022772534,0.015667634],"genre_scores_gemma":[0.49935567,0.0008267735,0.49430168,0.00009534318,0.00002069788,0.00040516272,0.0021180524,0.0004628675,0.0024137073],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993672,0.00020367866,0.00003661818,0.00006681133,0.0002601244,0.00006572197],"domain_scores_gemma":[0.99893814,0.00043457194,0.00014172445,0.00014065858,0.00027699626,0.000067977184],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009866871,0.0011382971,0.00069237704,0.004179401,0.00068343885,0.0034102271,0.0013212181,0.0011437078,0.003373448],"category_scores_gemma":[0.002612722,0.0007829757,0.0014197452,0.003185112,0.0011132944,0.001733759,0.0020374302,0.000814872,0.00056353136],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003509356,0.000086597356,0.011814505,0.00016043599,0.000057494544,0.00014210494,0.00060548837,0.9339704,0.0036876285,0.012269819,0.0011629018,0.036007453],"study_design_scores_gemma":[0.00000507982,0.000016132955,0.0025000249,0.000043415606,0.000011662696,0.000038274407,0.0003406968,0.98624957,0.0009450813,0.0048840116,0.004938532,0.000027446691],"about_ca_topic_score_codex":0.08760093,"about_ca_topic_score_gemma":0.07889421,"teacher_disagreement_score":0.08760093,"about_ca_system_score_codex":0.0025254737,"about_ca_system_score_gemma":0.0025704133,"threshold_uncertainty_score":0.17418212},"labels":[],"label_agreement":null},{"id":"W4387775752","doi":"10.3390/su152015049","title":"Potential Integration of Bridge Information Modeling and Life Cycle Assessment/Life Cycle Costing Tools for Infrastructure Projects within Construction 4.0: A Review","year":2023,"lang":"en","type":"review","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Government of Canada; University of Ottawa","funders":"National Research Council Canada","keywords":"Building information modeling; Bridge (graph theory); Life-cycle assessment; Engineering; Asset (computer security); Sustainability; Construction engineering; Key (lock); Systems engineering; Component (thermodynamics); Computer science; Risk analysis (engineering); Business; Operations management; Production (economics)","score_opus":0.026981108302123608,"score_gpt":0.31388506360274737,"score_spread":0.28690395530062374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4387775752","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00031180363,0.9974897,0.00048306055,0.00021022935,0.00006936755,0.00002138378,0.00003823161,0.000006830874,0.0013694074],"genre_scores_gemma":[0.0029791163,0.99537283,0.00120459,0.00011413843,0.000043160286,0.000029573976,0.00005539338,0.0000036616505,0.00019759042],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983095,0.0005293429,0.00034163345,0.00017771889,0.0005742896,0.00006744515],"domain_scores_gemma":[0.9928827,0.0050564865,0.00061650685,0.0001350324,0.0012169386,0.000092219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003589009,0.0010387325,0.0017129512,0.010267817,0.0003903965,0.0021152322,0.0012258838,0.0015029366,0.0026606317],"category_scores_gemma":[0.0066305865,0.00070229487,0.001579603,0.011354475,0.00049415464,0.0025070119,0.0008489815,0.0010059917,0.00069267635],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034257024,0.00008297291,0.00058883114,0.15866297,0.00041568454,0.00014608755,0.0003602959,0.00092001277,0.0009241642,0.00842366,0.0064278743,0.82301325],"study_design_scores_gemma":[0.000017514738,0.0001928133,0.0038588762,0.13563731,0.0024032497,0.0008005658,0.00064028194,0.0009264753,0.0016341372,0.0035667543,0.8502388,0.00008335073],"about_ca_topic_score_codex":0.0052597295,"about_ca_topic_score_gemma":0.009411149,"teacher_disagreement_score":0.010267817,"about_ca_system_score_codex":0.0014189989,"about_ca_system_score_gemma":0.0061528115,"threshold_uncertainty_score":0.018980682},"labels":[],"label_agreement":null},{"id":"W4388107915","doi":"10.18280/ijsdp.181005","title":"Impact of Construction Systems on Project Timelines: A Case Study of Multi-Floor Affordable Residential Buildings","year":2023,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Timeline; Architectural engineering; Affordable housing; Civil engineering; Engineering; Construction engineering; Environmental planning; Environmental science; Geography","score_opus":0.022155660841764208,"score_gpt":0.29723349099295104,"score_spread":0.2750778301511868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388107915","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99854565,0.000025380004,0.00059976353,0.000022649954,0.0000015757895,0.000042650947,0.00004390276,0.0000051194584,0.0007133827],"genre_scores_gemma":[0.9971733,0.000079131976,0.0018328162,0.000005138505,0.0000028019508,0.000034245448,0.00005328948,0.0000063025977,0.00081279274],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9981446,0.0009181633,0.000092901806,0.00015782226,0.0003880782,0.000298463],"domain_scores_gemma":[0.9947918,0.0033047427,0.00067761017,0.00022007656,0.00053411396,0.00047159116],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018541719,0.0004689041,0.0003843439,0.0011990943,0.0012869255,0.0012412356,0.0011028795,0.0010785054,0.0024023445],"category_scores_gemma":[0.0036059136,0.00033453206,0.0006283003,0.0017724921,0.0008615469,0.0009687907,0.00091074704,0.00067379005,0.00025858442],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0032810168,0.013264619,0.43602598,0.0017772611,0.0004230856,0.053327356,0.03127061,0.30450445,0.034302358,0.008042237,0.0024838229,0.111297205],"study_design_scores_gemma":[0.00048230137,0.016733928,0.5542165,0.00026529268,0.00046501565,0.0072181737,0.11997365,0.25191483,0.032508045,0.0021609785,0.013749352,0.0003119405],"about_ca_topic_score_codex":0.013071264,"about_ca_topic_score_gemma":0.030807698,"teacher_disagreement_score":0.013071264,"about_ca_system_score_codex":0.0019353806,"about_ca_system_score_gemma":0.0010922982,"threshold_uncertainty_score":0.025990367},"labels":[],"label_agreement":null},{"id":"W4388177368","doi":"10.1016/j.autcon.2023.105155","title":"Automated system for high-accuracy quantity takeoff using BIM","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":36,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Takeoff; Building information modeling; Dashboard; Reliability (semiconductor); Computer science; Procurement; Reliability engineering; Track (disk drive); Quality (philosophy); Systems engineering; Engineering; Database; Automotive engineering; Power (physics)","score_opus":0.02178659303656006,"score_gpt":0.26267407209469285,"score_spread":0.2408874790581328,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388177368","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0463601,0.0003112406,0.8849775,0.00022380265,0.00035401422,0.0005084773,0.0013586616,0.055150177,0.01075603],"genre_scores_gemma":[0.47268122,0.00026188898,0.51120263,0.00031929507,0.00016884129,0.0007020456,0.0028823316,0.0011953195,0.010586427],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9980501,0.00023021695,0.00011750103,0.00029257708,0.0011720207,0.00013756666],"domain_scores_gemma":[0.99881846,0.00015673954,0.00008452973,0.00031226664,0.00054249814,0.0000854857],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011308948,0.0013713104,0.0017553788,0.0027361847,0.001160287,0.0016444691,0.0019946822,0.0010208928,0.015722575],"category_scores_gemma":[0.0018199795,0.0007569023,0.0005217509,0.0019061283,0.00043982553,0.0014469865,0.0022762213,0.00071237306,0.00601976],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013027977,0.00065369176,0.00879124,0.0005309499,0.00014695678,0.0005750724,0.0007075644,0.020735487,0.16510175,0.0071528424,0.040868152,0.7534334],"study_design_scores_gemma":[0.00040662955,0.00096508366,0.022373818,0.00018198453,0.00030114202,0.0013337282,0.00045739612,0.6414107,0.2091375,0.008305799,0.11469406,0.000432163],"about_ca_topic_score_codex":0.0019921502,"about_ca_topic_score_gemma":0.0015507516,"teacher_disagreement_score":0.015722575,"about_ca_system_score_codex":0.00049448654,"about_ca_system_score_gemma":0.0015876369,"threshold_uncertainty_score":0.052597225},"labels":[],"label_agreement":null},{"id":"W4388198700","doi":"10.48209/978-65-5417-162-5","title":"EL MÉTODO DEL DISEÑO DE MEZCLAS Y SU IMPACTO EN LAS PROPIEDADES DEL CONCRETO","year":2023,"lang":"es","type":"book","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Humanities; Physics; Philosophy","score_opus":0.012808357743145845,"score_gpt":0.24656304474715468,"score_spread":0.23375468700400884,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388198700","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083643615,0.019148935,0.74693364,0.00086932635,0.0008040783,0.00025551982,0.0010019215,0.0039252806,0.14341773],"genre_scores_gemma":[0.30095702,0.023286905,0.56231076,0.00034037937,0.00046041075,0.00042041967,0.0016367506,0.0022461868,0.10834122],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99862623,0.00025553492,0.0000401014,0.00022152085,0.0008125426,0.00004416622],"domain_scores_gemma":[0.9982665,0.00096871116,0.000105622006,0.00018827218,0.0004421012,0.000028710341],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018054792,0.0013656633,0.0011188516,0.0017717286,0.00049669197,0.004086985,0.0011534843,0.0011664118,0.011091411],"category_scores_gemma":[0.005306665,0.00092832505,0.00087555445,0.0018752187,0.000922207,0.0029759181,0.0011633143,0.0013827889,0.0044457386],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048871146,0.00010266473,0.0048669246,0.0016605742,0.00007406782,0.00023881102,0.0011662391,0.02577435,0.030564772,0.032678057,0.010385633,0.8919991],"study_design_scores_gemma":[0.00016192149,0.0007692026,0.025484465,0.0018426292,0.00050131744,0.002207471,0.002757195,0.343914,0.11904534,0.040057655,0.4629892,0.00026954533],"about_ca_topic_score_codex":0.002283657,"about_ca_topic_score_gemma":0.0036744724,"teacher_disagreement_score":0.011091411,"about_ca_system_score_codex":0.000671504,"about_ca_system_score_gemma":0.000834165,"threshold_uncertainty_score":0.037104487},"labels":[],"label_agreement":null},{"id":"W4388213156","doi":"10.1007/978-3-031-39663-2","title":"Proceedings of SECON’23","year":2023,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Engineering; Computer science","score_opus":0.00578306178442387,"score_gpt":0.181262018049728,"score_spread":0.17547895626530413,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388213156","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006007266,0.010895768,0.050876025,0.00639774,0.04300607,0.0002217841,0.0025728568,0.0018854425,0.87813705],"genre_scores_gemma":[0.015860904,0.0049535395,0.0134377275,0.0006793377,0.0029031844,0.00017507355,0.004791982,0.0021507808,0.9550475],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99831796,0.00045370852,0.00006796318,0.00023405126,0.0007520342,0.0001743972],"domain_scores_gemma":[0.99836713,0.00026003516,0.000041532483,0.00038810176,0.00067523937,0.0002679053],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0025986987,0.0014047561,0.001211786,0.0012731185,0.0012238654,0.0052162153,0.0011306842,0.0009582571,0.16042909],"category_scores_gemma":[0.002436917,0.00043088826,0.0006977497,0.0021196937,0.0009312149,0.0018773066,0.00231942,0.0017395937,0.07833185],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017379844,0.000090973896,0.00025706794,0.00018309968,0.000021168724,0.00011256985,0.00013634468,0.0011183723,0.0011755351,0.029996047,0.7778711,0.18886395],"study_design_scores_gemma":[0.000012601582,0.000029251452,0.00032604154,0.000086211425,0.000008167374,0.00006673838,0.000059874637,0.0010493435,0.0005913045,0.007585003,0.9901786,0.000006951626],"about_ca_topic_score_codex":0.0053674136,"about_ca_topic_score_gemma":0.0107379425,"teacher_disagreement_score":0.8395709,"about_ca_system_score_codex":0.0021207854,"about_ca_system_score_gemma":0.0026311495,"threshold_uncertainty_score":0.5366888},"labels":[],"label_agreement":null},{"id":"W4388541810","doi":"10.51483/ijaiml.3.2.2023.57-73","title":"Revolutionizing Construction: The Impact of Artificial Intelligence on Productivity","year":2023,"lang":"en","type":"article","venue":"International Journal of Artificial Intelligence and Machine Learning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Computer science; Engineering; Artificial intelligence; Economics; Economic growth","score_opus":0.04299398507410898,"score_gpt":0.3056058142472521,"score_spread":0.2626118291731431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388541810","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3219212,0.02340589,0.021112615,0.044834718,0.0003498163,0.000066178094,0.00012583716,0.00017805421,0.5880056],"genre_scores_gemma":[0.9901445,0.005251225,0.0018769525,0.00036091157,0.00011098316,0.0000134091715,0.000013622465,0.000018653542,0.002209828],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99502385,0.0024934043,0.00013504925,0.00037404188,0.0012730656,0.00070054305],"domain_scores_gemma":[0.97539526,0.020038655,0.001524869,0.0009859985,0.0013368898,0.00071833446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006679142,0.00052317494,0.0002495076,0.0019007553,0.0015508285,0.009356854,0.0009005222,0.0013064427,0.004865034],"category_scores_gemma":[0.01645279,0.00019214796,0.00041479032,0.0031187304,0.0073519037,0.00784801,0.0036124329,0.0013945983,0.00056638476],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027147334,0.00027111368,0.03594927,0.0009938101,0.00010781849,0.00074912916,0.014857916,0.0087118205,0.0015558138,0.45987296,0.0071442504,0.4695146],"study_design_scores_gemma":[0.000059566217,0.0004239784,0.10723499,0.0020425706,0.00015115758,0.0007284604,0.04960615,0.015782269,0.004685132,0.6238363,0.19532438,0.00012511223],"about_ca_topic_score_codex":0.004359585,"about_ca_topic_score_gemma":0.003457732,"teacher_disagreement_score":0.009356854,"about_ca_system_score_codex":0.004725399,"about_ca_system_score_gemma":0.0028765518,"threshold_uncertainty_score":0.035323143},"labels":[],"label_agreement":null},{"id":"W4388738020","doi":"10.1080/24751448.2023.2245712","title":"Automatic Generation of Architectural Plans with Machine Learning","year":2023,"lang":"en","type":"article","venue":"Technology|Architecture + Design","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"International Federation on Ageing","funders":"","keywords":"Computer science; Software engineering; Architectural engineering; Artificial intelligence; Engineering drawing; Systems engineering; Engineering","score_opus":0.014545803977257212,"score_gpt":0.19932557797806905,"score_spread":0.18477977400081183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388738020","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019255336,0.00007392755,0.9720505,0.000097249715,0.000025433277,0.0001502304,0.00014315629,0.0046902224,0.0035140337],"genre_scores_gemma":[0.22994547,0.00008281647,0.7676355,0.000044174933,0.000008772939,0.00018501203,0.00052571093,0.0002743983,0.0012981432],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99943215,0.00015577808,0.000029137933,0.00013403551,0.00020563747,0.000043147673],"domain_scores_gemma":[0.9985929,0.0007440722,0.00011178419,0.00026441572,0.00025653554,0.000030251309],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008355424,0.0009575165,0.0006712196,0.001427954,0.00051321334,0.0009768119,0.0009617525,0.0007208391,0.005175223],"category_scores_gemma":[0.0033083134,0.0005956378,0.00089708844,0.0009889313,0.00061413,0.0009781357,0.00088573527,0.00081440585,0.0011185143],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000107029206,0.00011878992,0.0013300473,0.00017195541,0.00005306669,0.00012558232,0.00021455997,0.41565734,0.008141852,0.009048884,0.0034100877,0.5616208],"study_design_scores_gemma":[0.000013218074,0.000029301227,0.0002115378,0.000015088131,0.0000088862635,0.000029649816,0.000052839427,0.98398626,0.0054008486,0.008555559,0.0016882289,0.0000085013235],"about_ca_topic_score_codex":0.0038038,"about_ca_topic_score_gemma":0.0054198448,"teacher_disagreement_score":0.005175223,"about_ca_system_score_codex":0.00085621636,"about_ca_system_score_gemma":0.0013632831,"threshold_uncertainty_score":0.017312884},"labels":[],"label_agreement":null},{"id":"W4388859628","doi":"10.3390/app132312563","title":"Exploring BIM Implementation Challenges in Complex Renovation Projects: A Case Study of UBC’s BRDF Expansion","year":2023,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"University of British Columbia","keywords":"Building information modeling; Process management; Workflow; Procurement; Knowledge management; Key (lock); Engineering management; Project management; CLARITY; Engineering; Business; Computer science; Systems engineering; Operations management","score_opus":0.3557410557898048,"score_gpt":0.3422381483836603,"score_spread":0.013502907406144515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388859628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98524994,0.00012052379,0.006989596,0.00052498595,0.000014783277,0.00020598249,0.000053614014,0.000039017264,0.006801537],"genre_scores_gemma":[0.985696,0.00024171403,0.011042903,0.00010720556,0.0000074980376,0.00018121666,0.00004948106,0.00004653913,0.0026274044],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99175006,0.00553683,0.00018900595,0.00049573544,0.0010886119,0.000939644],"domain_scores_gemma":[0.98980135,0.006408611,0.0007099275,0.0008925686,0.0010850347,0.0011024326],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009334017,0.00074071554,0.000712335,0.0016380473,0.008258172,0.0035841148,0.002503125,0.0027532002,0.0021455665],"category_scores_gemma":[0.012384543,0.0007166752,0.0006377681,0.0021045743,0.0040887883,0.0026008438,0.0040664594,0.002668572,0.0003443138],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005982373,0.004236304,0.060481157,0.0011213555,0.000116055206,0.07079019,0.63475287,0.019496331,0.009735479,0.023405505,0.006200609,0.16906592],"study_design_scores_gemma":[0.000094655545,0.001904187,0.05701907,0.0006958557,0.00009002006,0.011426075,0.791747,0.02421909,0.0085818935,0.007435483,0.09651227,0.0002745195],"about_ca_topic_score_codex":0.013714127,"about_ca_topic_score_gemma":0.039120078,"teacher_disagreement_score":0.013714127,"about_ca_system_score_codex":0.0043967823,"about_ca_system_score_gemma":0.004981128,"threshold_uncertainty_score":0.049363554},"labels":[],"label_agreement":null},{"id":"W4388962040","doi":"10.1007/978-3-031-44742-6_14","title":"The Multi-Objective Optimization Ratio Analysis (MOORA) in Uncertainty Environment","year":2023,"lang":"en","type":"book-chapter","venue":"Studies in computational intelligence","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Mathematical optimization; Computer science; Mathematics","score_opus":0.05129540939322504,"score_gpt":0.29185189545525436,"score_spread":0.2405564860620293,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388962040","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018646711,0.007767819,0.97437346,0.00024762683,0.00019034177,0.000017484384,0.00003939498,0.00018584316,0.015313402],"genre_scores_gemma":[0.14331818,0.011766528,0.8279443,0.00033438538,0.00052286725,0.00018333338,0.0001593954,0.00052791357,0.015243068],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999003,0.00042119398,0.00003728361,0.00012706427,0.00037609963,0.00003536883],"domain_scores_gemma":[0.999383,0.00043879088,0.000045688626,0.000048642523,0.0000722585,0.000011475492],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015146458,0.0011572763,0.001206226,0.0011222643,0.0003165618,0.0016328986,0.001046,0.0007780967,0.0029673623],"category_scores_gemma":[0.0031380248,0.0005006686,0.0010550783,0.0017328439,0.001124803,0.0019293039,0.0014604792,0.0018286104,0.00079334044],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045491586,0.0000349473,0.0002941692,0.00047763906,0.000127017,0.000085439206,0.00009156153,0.28089803,0.0026747093,0.3481415,0.008711882,0.35841766],"study_design_scores_gemma":[0.000006443743,0.00007779583,0.00047165647,0.000118630574,0.000052739135,0.00016919905,0.000047225356,0.7299815,0.0026935514,0.23612054,0.030217638,0.000043046275],"about_ca_topic_score_codex":0.0008601029,"about_ca_topic_score_gemma":0.00079572765,"teacher_disagreement_score":0.0029673623,"about_ca_system_score_codex":0.0005029284,"about_ca_system_score_gemma":0.00047187446,"threshold_uncertainty_score":0.009926796},"labels":[],"label_agreement":null},{"id":"W4388971245","doi":"10.3390/buildings13122933","title":"Identification of Occupant Dissatisfaction Factors in Newly Constructed Apartments: Text Mining and Semantic Network Analysis","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Apartment; Post-occupancy evaluation; Identification (biology); Computer science; Receipt; Lexical analysis; Engineering; World Wide Web; Architectural engineering; Artificial intelligence; Civil engineering","score_opus":0.008826616983771554,"score_gpt":0.22920857149073623,"score_spread":0.22038195450696468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4388971245","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95985615,0.0008124767,0.026678488,0.0005825267,0.00006532067,0.0002923859,0.008921154,0.0002497889,0.002541703],"genre_scores_gemma":[0.95319533,0.00061918347,0.030466456,0.00008757176,0.00006139641,0.00033187054,0.01369561,0.000018306564,0.0015242499],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.99915683,0.00013919132,0.00014227923,0.00022795971,0.00024701506,0.00008660622],"domain_scores_gemma":[0.9984029,0.0008007555,0.00039442314,0.00005932888,0.00026915513,0.000073530035],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000749047,0.0006094214,0.00042899678,0.004578339,0.0005255062,0.0007557372,0.0004810546,0.0006453715,0.0005283162],"category_scores_gemma":[0.0024629342,0.00013448912,0.00064855494,0.0033063092,0.0002698095,0.0009927168,0.0005593347,0.00038680938,0.00024337831],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011887491,0.0013676562,0.52862865,0.0025690394,0.0005058287,0.0049782563,0.007519502,0.018576777,0.04544847,0.002859324,0.013327797,0.37302995],"study_design_scores_gemma":[0.00003501353,0.00028364247,0.7007608,0.00026038452,0.00035430872,0.001480022,0.017499262,0.24418467,0.011777078,0.0026015902,0.02065862,0.00010458264],"about_ca_topic_score_codex":0.008991383,"about_ca_topic_score_gemma":0.013569801,"teacher_disagreement_score":0.008991383,"about_ca_system_score_codex":0.0007006166,"about_ca_system_score_gemma":0.00061947486,"threshold_uncertainty_score":0.017878115},"labels":[],"label_agreement":null},{"id":"W4389143464","doi":"10.3390/buildings13122973","title":"Analytical Hierarchical Process as a Multicriteria Decision Tool in Material Selection for Prefabricated Wood Buildings","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Analytic hierarchy process; Architectural engineering; Multiple-criteria decision analysis; Quality (philosophy); Process (computing); Computer science; Popularity; Material selection; Civil engineering; Construction engineering; Engineering; Operations research; Materials science","score_opus":0.01082374620698374,"score_gpt":0.2725178034097161,"score_spread":0.26169405720273237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389143464","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09439758,0.00041991624,0.89697164,0.00042398775,0.000057350353,0.001539298,0.00019495224,0.0002660334,0.0057292525],"genre_scores_gemma":[0.3815058,0.0002921339,0.61598563,0.00006900263,0.00002331371,0.0010200234,0.00023483793,0.00002872921,0.0008405079],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9793576,0.013334302,0.0010528833,0.0009275005,0.0044423817,0.00088541885],"domain_scores_gemma":[0.98318094,0.012443709,0.0011206288,0.00035194316,0.0025565727,0.00034620144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01922079,0.0013244061,0.0014835276,0.00670286,0.0020341189,0.003906979,0.0013776276,0.0008716908,0.0038827902],"category_scores_gemma":[0.024868922,0.0007423614,0.0019237358,0.005741197,0.0011238937,0.0023840545,0.0028899673,0.001713686,0.00045919998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010789107,0.0012535807,0.017114876,0.0024127283,0.00057351636,0.000639843,0.008444547,0.35761836,0.010449224,0.0650892,0.0032842124,0.53204095],"study_design_scores_gemma":[0.00013470015,0.0008004781,0.0049906983,0.00033206053,0.00016562776,0.00011743626,0.004057469,0.94005036,0.0046909056,0.039474383,0.005078077,0.00010779527],"about_ca_topic_score_codex":0.0062701544,"about_ca_topic_score_gemma":0.009066563,"teacher_disagreement_score":0.01922079,"about_ca_system_score_codex":0.0027389966,"about_ca_system_score_gemma":0.006488386,"threshold_uncertainty_score":0.10165042},"labels":[],"label_agreement":null},{"id":"W4389192008","doi":"10.22215/etd/2023-15650","title":"Towards Smart Building Maintenance: Leveraging Multi-Source Data and Digital Twins with Ecological Momentary Assessment","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Facility management; Workflow; Computer science; Data management; Analytics; Data science; Systems engineering; Engineering; Data mining; Database","score_opus":0.024479716622410566,"score_gpt":0.2736661860075656,"score_spread":0.24918646938515504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389192008","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0605805,0.0010894116,0.91651183,0.0016068186,0.00013978333,0.0005460112,0.002670184,0.0061457707,0.010709693],"genre_scores_gemma":[0.25548762,0.00080598117,0.73602325,0.00036244048,0.00007680446,0.0003029329,0.0038705878,0.0005111067,0.0025591846],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99598396,0.0011600952,0.0004087363,0.0008812402,0.0014133317,0.00015256181],"domain_scores_gemma":[0.99258476,0.0029011308,0.00067179854,0.002261149,0.0012635399,0.00031751496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004947824,0.0010274808,0.00087113486,0.0061249435,0.0005732775,0.005198906,0.001598999,0.0008921046,0.0022952657],"category_scores_gemma":[0.015567387,0.0006971376,0.0009674186,0.004086018,0.00095869455,0.009240121,0.007441082,0.0016106778,0.0010856543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042468202,0.0005071521,0.043168947,0.001305465,0.00029487195,0.00079174986,0.0068174875,0.014031385,0.018807815,0.049162157,0.010922424,0.85376585],"study_design_scores_gemma":[0.00009432686,0.00083799416,0.055067956,0.001685437,0.00057318056,0.002427577,0.0115589,0.41252166,0.048319057,0.21838014,0.24814345,0.00039035777],"about_ca_topic_score_codex":0.0025897129,"about_ca_topic_score_gemma":0.005640981,"teacher_disagreement_score":0.0061249435,"about_ca_system_score_codex":0.0006090242,"about_ca_system_score_gemma":0.0009582379,"threshold_uncertainty_score":0.026166916},"labels":[],"label_agreement":null},{"id":"W4389206928","doi":"10.22215/etd/2023-15781","title":"An Analysis of the National Digital Twin Programme in the United Kingdom","year":2023,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Government of the United Kingdom","keywords":"Engineering; Culmination; Architecture; Product (mathematics); Lean manufacturing; Twin cities; Kingdom; Engineering management; Manufacturing engineering; Geography","score_opus":0.025789296035665432,"score_gpt":0.2743078878510197,"score_spread":0.2485185918153543,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389206928","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6621011,0.0026860994,0.0012063402,0.0067764777,0.00016174892,0.00012288205,0.00084751507,0.000032467848,0.32606542],"genre_scores_gemma":[0.9632575,0.00094741804,0.0004951985,0.00056039327,0.000009634865,0.000051271327,0.00029595353,0.00003083427,0.03435178],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961696,0.00095035706,0.00022037087,0.00026025707,0.0014272088,0.00097212155],"domain_scores_gemma":[0.9961887,0.0010750719,0.00050939247,0.00029820672,0.0012966252,0.00063216395],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00206151,0.00012823334,0.0002219683,0.0018986679,0.0033114972,0.0057446496,0.00058315863,0.000703392,0.0107108215],"category_scores_gemma":[0.008390254,0.00025628068,0.00019395852,0.004779151,0.0022334792,0.0023370364,0.0058473987,0.0009514644,0.0006623874],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035908152,0.00010055148,0.07469948,0.0006673408,0.000029207002,0.0034377933,0.12820819,0.0012445074,0.0010405838,0.5949332,0.034674793,0.1606053],"study_design_scores_gemma":[0.000017571558,0.00009397787,0.22706722,0.00056733016,0.000019147154,0.0006453494,0.11646617,0.0007106657,0.00050847,0.0047504646,0.6491147,0.00003887127],"about_ca_topic_score_codex":0.24256714,"about_ca_topic_score_gemma":0.32053703,"teacher_disagreement_score":0.24256714,"about_ca_system_score_codex":0.02222423,"about_ca_system_score_gemma":0.010640779,"threshold_uncertainty_score":0.48231047},"labels":[],"label_agreement":null},{"id":"W4389333406","doi":"10.7202/1105859ar","title":"OBSERVATIONS CONCERNANT CERTAINS CHANGEMENTS APPORTÉS AU CODE CIVIL PAR LA LOI MODIFIANT LE CODE CIVIL ET D’AUTRES DISPOSITIONS LÉGISLATIVES EN MATIÈRE DE RECHERCHE","year":2013,"lang":"fr","type":"article","venue":"Revue de droit Université de Sherbrooke","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Université de Sherbrooke; Musée de la Civilisation","funders":"","keywords":"Humanities; Political science; Art","score_opus":0.049275345925272745,"score_gpt":0.25563878306749643,"score_spread":0.2063634371422237,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389333406","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88232595,0.000747177,0.009432591,0.0053219227,0.0003377728,0.00037306175,0.0018520738,0.00067823776,0.09893127],"genre_scores_gemma":[0.87989444,0.00068366865,0.008071588,0.0007468648,0.00007388798,0.00025104417,0.0011520225,0.00031189725,0.108814605],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99170905,0.0017970111,0.00041343554,0.001028962,0.004141488,0.00091002806],"domain_scores_gemma":[0.9680464,0.00936685,0.0036911967,0.0031859486,0.014257211,0.001452383],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073030614,0.00034492815,0.00040223013,0.003303091,0.005355114,0.0022041155,0.0010252002,0.0012295891,0.013262351],"category_scores_gemma":[0.026987325,0.00037762063,0.00051451917,0.0034495988,0.0029861478,0.001296815,0.001655167,0.0018109435,0.0020856417],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011894157,0.0006164425,0.22538498,0.0009665022,0.00014143334,0.004402509,0.3068894,0.004131621,0.05589062,0.029003045,0.05635446,0.3150295],"study_design_scores_gemma":[0.000027482849,0.0003914542,0.5879622,0.0003136747,0.00005876633,0.0008322979,0.08741554,0.0017316446,0.016418396,0.0019155261,0.30272108,0.00021189527],"about_ca_topic_score_codex":0.44942427,"about_ca_topic_score_gemma":0.62071687,"teacher_disagreement_score":0.44942427,"about_ca_system_score_codex":0.009629799,"about_ca_system_score_gemma":0.009044715,"threshold_uncertainty_score":0.8936167},"labels":[],"label_agreement":null},{"id":"W4389380616","doi":"10.1016/j.autcon.2023.105228","title":"Simulation-based comparison of push- and pull-based planning in panelized construction","year":2023,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Association for Canadian and Québec Literatures; University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Prefabrication; Factory (object-oriented programming); Discrete event simulation; Engineering; Reduction (mathematics); Construction management; Event (particle physics); Computer science; Construction engineering; Systems engineering; Operations research; Simulation; Civil engineering","score_opus":0.023004955165500683,"score_gpt":0.2858671143505609,"score_spread":0.26286215918506023,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389380616","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93762904,0.0001047489,0.046179384,0.00009975107,0.000038567614,0.00010940884,0.00067029346,0.00066879357,0.0145],"genre_scores_gemma":[0.99450654,0.000031141815,0.0047020814,0.0000052155883,9.4070265e-7,0.000028837474,0.0001893277,0.000023955354,0.0005119695],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99963903,0.00014753373,0.000019386978,0.00004580042,0.00008446817,0.00006375883],"domain_scores_gemma":[0.99766266,0.0017669022,0.00007250228,0.00014292327,0.00026284953,0.000092111666],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069549517,0.00046375152,0.00069244864,0.0006000123,0.0003902925,0.0010329024,0.0009282097,0.0010002198,0.0058183456],"category_scores_gemma":[0.0020631147,0.00043603085,0.00049627264,0.00085192226,0.00047144413,0.0005809388,0.00050701614,0.00059048354,0.00038434504],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022007576,0.000120632045,0.0008599096,0.000024788738,0.000012222122,0.000021560338,0.00003738197,0.9935859,0.0005857177,0.0005608788,0.00013055606,0.0038404502],"study_design_scores_gemma":[0.00001692961,0.00006890251,0.0005878237,0.0000041219896,0.0000073341266,0.0000040215455,0.000032261876,0.9982955,0.0006445316,0.0002018103,0.00012933915,0.0000074181307],"about_ca_topic_score_codex":0.03548301,"about_ca_topic_score_gemma":0.028045652,"teacher_disagreement_score":0.03548301,"about_ca_system_score_codex":0.0010696555,"about_ca_system_score_gemma":0.0014097616,"threshold_uncertainty_score":0.070552945},"labels":[],"label_agreement":null},{"id":"W4389583822","doi":"10.1063/5.0169643","title":"Influence of BIM on work breakdown structure in the construction industry","year":2023,"lang":"en","type":"article","venue":"AIP conference proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Construction industry; Work (physics); Computer science; Construction engineering; Engineering; Mechanical engineering","score_opus":0.012549111122422171,"score_gpt":0.21889038893788718,"score_spread":0.20634127781546502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389583822","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9830925,0.00018069889,0.003855564,0.00010063288,0.000018523479,0.000010187695,0.000077060984,0.00007354116,0.012591282],"genre_scores_gemma":[0.9988029,0.000035743316,0.00048767877,0.000007048432,0.0000021145963,0.0000026135247,0.000040410658,0.000014451208,0.0006069455],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9984621,0.0005408981,0.000046759047,0.000077392,0.0005745576,0.00029838344],"domain_scores_gemma":[0.99593735,0.002255082,0.0002965271,0.00031432434,0.00097424735,0.00022240372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020578718,0.00027508917,0.00038886155,0.0013782916,0.00084137666,0.002079629,0.000383182,0.0006253842,0.0063870708],"category_scores_gemma":[0.008536107,0.0003191814,0.00028821104,0.0011333956,0.00067790423,0.0010227379,0.0011640848,0.0004977686,0.0010146381],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0059442758,0.0017990106,0.21836245,0.00035792714,0.00013801895,0.0010904528,0.0020676155,0.49268624,0.057980567,0.022018308,0.003143594,0.1944116],"study_design_scores_gemma":[0.00010936543,0.001721639,0.4886412,0.00013624474,0.00014903316,0.00088574475,0.007695444,0.43396503,0.046011012,0.012416599,0.008170114,0.000098547556],"about_ca_topic_score_codex":0.0030760248,"about_ca_topic_score_gemma":0.0030731119,"teacher_disagreement_score":0.0063870708,"about_ca_system_score_codex":0.0009489729,"about_ca_system_score_gemma":0.0008164879,"threshold_uncertainty_score":0.021366954},"labels":[],"label_agreement":null},{"id":"W4389626402","doi":"10.3390/buildings13123087","title":"Towards Human–Robot Collaboration in Construction: Understanding Brickwork Production Rate Factors","year":2023,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Brickwork; Context (archaeology); Engineering; Productivity; Variance (accounting); Operations management; Production (economics); Mathematics; Operations research; Knowledge management; Marketing; Management; Statistics; Computer science; Business; Geography; Civil engineering; Economics; Accounting","score_opus":0.03158551655730162,"score_gpt":0.25943120301444195,"score_spread":0.22784568645714032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389626402","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9085742,0.0014222915,0.0759393,0.0006784736,0.000040653944,0.00012198946,0.0002160912,0.000086954264,0.012920001],"genre_scores_gemma":[0.99128854,0.00050130166,0.007453028,0.000023341043,0.000011017571,0.000055270244,0.00008355831,0.000014898998,0.00056912657],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99752396,0.0009269104,0.0001498815,0.0004812978,0.00062892336,0.0002890094],"domain_scores_gemma":[0.98807293,0.006487072,0.0031408898,0.000495764,0.0012744216,0.0005287789],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003358996,0.0007900925,0.00042663835,0.0024160875,0.0007105996,0.0032560301,0.000739345,0.00083929725,0.0040239454],"category_scores_gemma":[0.016798316,0.0004953421,0.0005518713,0.001814589,0.0014404784,0.003290453,0.00197728,0.0007273445,0.00074282987],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023269869,0.0003937784,0.7678348,0.0011842097,0.00017841389,0.0006615441,0.029687537,0.031824984,0.0047588605,0.009320157,0.0012402497,0.15268277],"study_design_scores_gemma":[0.0000131962515,0.00032526493,0.86240166,0.00067600067,0.00010539915,0.0004781789,0.04822744,0.062118407,0.0015881782,0.01388935,0.010078838,0.00009799241],"about_ca_topic_score_codex":0.0055418382,"about_ca_topic_score_gemma":0.0065208836,"teacher_disagreement_score":0.0055418382,"about_ca_system_score_codex":0.0010694925,"about_ca_system_score_gemma":0.0014857939,"threshold_uncertainty_score":0.01776427},"labels":[],"label_agreement":null},{"id":"W4389746675","doi":"10.1007/979-8-8688-0005-4_4","title":"Setting Up Your Workspace","year":2023,"lang":"en","type":"book-chapter","venue":"Apress eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Delta-Q Technologies (Canada)","funders":"","keywords":"Workspace; Workflow; Set (abstract data type); Section (typography); Computer science; Tracing; Engineering drawing; World Wide Web; Human–computer interaction; Computer graphics (images); Engineering; Artificial intelligence; Operating system; Database; Programming language","score_opus":0.024574578824021316,"score_gpt":0.21646331027137403,"score_spread":0.19188873144735272,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4389746675","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0043578297,0.006136108,0.20860069,0.0046604364,0.0036068829,0.00060282095,0.00049583195,0.008287986,0.7632514],"genre_scores_gemma":[0.03557401,0.0081041865,0.33478785,0.0026946254,0.0010733271,0.0009816826,0.002013595,0.006264801,0.60850596],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856573,0.00038830595,0.000081279875,0.0002126877,0.00060356327,0.00014841651],"domain_scores_gemma":[0.9986565,0.00025315583,0.000053991353,0.00024553091,0.000415227,0.0003754543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018344127,0.001095678,0.0006923292,0.0018833454,0.0035223288,0.008390925,0.0019691254,0.002246218,0.094369665],"category_scores_gemma":[0.004975334,0.0006953742,0.0006636692,0.0012913654,0.001513385,0.010210446,0.007806033,0.0033721097,0.07793485],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032919692,0.00011526329,0.00041745478,0.0005684233,0.000006610829,0.00053866603,0.009617117,0.000971551,0.003144168,0.19107696,0.40379933,0.38971153],"study_design_scores_gemma":[0.0000033259507,0.000013974213,0.00011354137,0.0003193826,0.000002061,0.0003443142,0.0010262456,0.00018165779,0.0005800943,0.009176867,0.9882274,0.000011125755],"about_ca_topic_score_codex":0.0009108585,"about_ca_topic_score_gemma":0.0015375562,"teacher_disagreement_score":0.094369665,"about_ca_system_score_codex":0.0012733581,"about_ca_system_score_gemma":0.0018554113,"threshold_uncertainty_score":0.31569797},"labels":[],"label_agreement":null},{"id":"W4390047559","doi":"10.1016/j.compind.2023.104063","title":"Neural semantic tagging for natural language-based search in building information models: Implications for practice","year":2023,"lang":"en","type":"article","venue":"Computers in Industry","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Computer science; Semantic search; Natural language; Information extraction; Artificial intelligence; Deep learning; Schema (genetic algorithms); Information retrieval; Data science; Natural language processing; Semantic Web","score_opus":0.029952105593646434,"score_gpt":0.30156472329395007,"score_spread":0.27161261770030365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390047559","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08507079,0.0016490482,0.8912869,0.0057726307,0.00015545102,0.00021067735,0.00084156566,0.002489986,0.012522955],"genre_scores_gemma":[0.773935,0.00060877536,0.22204259,0.00048301878,0.00007644129,0.00017030766,0.00090503815,0.00017598548,0.001602852],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99713814,0.0016486367,0.00023141695,0.0005154751,0.0003522403,0.00011405563],"domain_scores_gemma":[0.9617935,0.03278287,0.0005847755,0.0023923581,0.0020714474,0.00037510248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007865889,0.0007126392,0.0011254482,0.0020624266,0.0010375007,0.0043362305,0.0024035126,0.0026870538,0.006867722],"category_scores_gemma":[0.06064787,0.0005496963,0.0005963797,0.0026316263,0.0018167512,0.013345011,0.0024000476,0.0021749642,0.0012484643],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079545175,0.000993348,0.013230082,0.0008743088,0.00023755697,0.00019765852,0.0011753879,0.1523472,0.0043383,0.12666716,0.011295415,0.6878481],"study_design_scores_gemma":[0.000057994283,0.00005544973,0.0010856992,0.00012616445,0.000042605014,0.000088007786,0.00034396903,0.7732812,0.0022655844,0.22042716,0.0021898642,0.000036348665],"about_ca_topic_score_codex":0.0135907335,"about_ca_topic_score_gemma":0.015916994,"teacher_disagreement_score":0.0135907335,"about_ca_system_score_codex":0.0022390352,"about_ca_system_score_gemma":0.002518659,"threshold_uncertainty_score":0.041599333},"labels":[],"label_agreement":null},{"id":"W4390052999","doi":"10.47960/2232-9080.2023.26.13.64","title":"Time deviation analysis of the baseline plan on the case study: Implementation of reinforced concrete works on a school construction project in the Republic of Croatia","year":2023,"lang":"en","type":"article","venue":"E-Zbornik elektronički zbornik radova Građevinskog fakulteta","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Orthopaedic Innovation Centre","funders":"","keywords":"Baseline (sea); Plan (archaeology); Reinforced concrete; Engineering; Civil engineering; Political science; Geography; Structural engineering; Archaeology; Law","score_opus":0.017984442705895116,"score_gpt":0.2659995791787084,"score_spread":0.2480151364728133,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390052999","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98135227,0.000079789745,0.01442607,0.000069557034,0.000011863466,0.00015017585,0.00029485815,0.00004786967,0.0035674893],"genre_scores_gemma":[0.98632544,0.00007449776,0.012242446,0.0000054759666,0.0000029932055,0.000103012906,0.00038546615,0.000019410712,0.0008413684],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9959706,0.0010203542,0.0002463201,0.0004088439,0.002046804,0.000307147],"domain_scores_gemma":[0.9903127,0.0046606413,0.0015805262,0.0005753279,0.0025331432,0.00033779524],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004027209,0.000300496,0.0002725228,0.0017062138,0.00048722417,0.0010720785,0.00059191196,0.00037007369,0.0013626906],"category_scores_gemma":[0.009566856,0.00019064423,0.00035684457,0.0020629114,0.00055409345,0.00066158833,0.00065836485,0.0005314967,0.00017328719],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.001903744,0.0012951281,0.43949884,0.0010538449,0.00016340108,0.0040049325,0.01744099,0.11197532,0.03221756,0.010047384,0.0025622342,0.37783664],"study_design_scores_gemma":[0.00006037187,0.0024168552,0.7972182,0.00024925006,0.00013255372,0.0010020409,0.037165754,0.12126609,0.022354662,0.0018980997,0.0160904,0.00014563925],"about_ca_topic_score_codex":0.008120721,"about_ca_topic_score_gemma":0.011443428,"teacher_disagreement_score":0.008120721,"about_ca_system_score_codex":0.001607896,"about_ca_system_score_gemma":0.002162821,"threshold_uncertainty_score":0.02129811},"labels":[],"label_agreement":null},{"id":"W4390140118","doi":"10.47982/jfde.2023.2.a1","title":"Off-site prefabricated hybrid façade systems","year":2023,"lang":"en","type":"article","venue":"Journal of Facade Design and Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cascades (Canada)","funders":"Horizon 2020 Framework Programme; European Commission","keywords":"Architectural engineering; Popularity; Computer science; Engineering","score_opus":0.015051588708807483,"score_gpt":0.19672238100770703,"score_spread":0.18167079229889954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390140118","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76440895,0.00061928335,0.19171056,0.00008700317,0.00011032762,0.000250804,0.000510378,0.0023495418,0.03995316],"genre_scores_gemma":[0.9450267,0.00016767273,0.035013735,0.000030217394,0.0000092454675,0.000057023677,0.00037003518,0.00009731966,0.019228047],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99952066,0.00005007905,0.000018406334,0.000059749815,0.0002686144,0.00008256498],"domain_scores_gemma":[0.999653,0.000039318023,0.000040466464,0.00013081034,0.00010747019,0.000028825385],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004078236,0.0007548055,0.00033699922,0.0007604528,0.00028147374,0.00073091,0.0008426351,0.0005491564,0.010022376],"category_scores_gemma":[0.00054790004,0.00019200513,0.00041936958,0.00046361075,0.000310046,0.00070145313,0.001045618,0.00031824582,0.0020602862],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000871877,0.0003539114,0.012424063,0.00052276114,0.000059728383,0.0005563654,0.0008347177,0.044384003,0.2909843,0.005540566,0.00252877,0.6409389],"study_design_scores_gemma":[0.00018341954,0.0084321555,0.11414995,0.0003261417,0.00028110345,0.007191655,0.0026016783,0.17319594,0.40158093,0.00501522,0.28675064,0.00029123898],"about_ca_topic_score_codex":0.0015505494,"about_ca_topic_score_gemma":0.0032642737,"teacher_disagreement_score":0.010022376,"about_ca_system_score_codex":0.0002816697,"about_ca_system_score_gemma":0.00033512292,"threshold_uncertainty_score":0.03352815},"labels":[],"label_agreement":null},{"id":"W4390453510","doi":"10.17678/beuscitech.1279862","title":"Issues and Challenges in the Philippine Construction Industry: An Opportunity for BIM Adoption","year":2023,"lang":"en","type":"article","venue":"Bitlis Eren University Journal of Science and Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cronbach's alpha; Outsourcing; Building information modeling; Productivity; Quarter (Canadian coin); Business; Construction industry; Descriptive statistics; Reliability (semiconductor); Marketing; Operations management; Engineering; Economic growth; Economics; Construction engineering; Geography; Mathematics","score_opus":0.05630538412192636,"score_gpt":0.24343722330601197,"score_spread":0.1871318391840856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390453510","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8729254,0.013362362,0.0035335321,0.046754614,0.00021434805,0.0002020271,0.00019900159,0.00008047948,0.06272814],"genre_scores_gemma":[0.9816506,0.008951157,0.003544636,0.001747917,0.00007136995,0.000077235054,0.00009143663,0.000023418528,0.0038421603],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99476045,0.0022469321,0.00028119108,0.00035538155,0.001704433,0.0006516612],"domain_scores_gemma":[0.9911145,0.0031639545,0.0015759277,0.00024359969,0.0031177131,0.00078425655],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0077095446,0.00039483694,0.00031172595,0.0028466647,0.0040498385,0.008679944,0.0011514166,0.001960952,0.0039340616],"category_scores_gemma":[0.009851335,0.00046181137,0.0003569116,0.0058355164,0.0021506094,0.0075992066,0.0040353457,0.0020418824,0.0005495609],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014092964,0.0007043795,0.2025668,0.0042376984,0.00005099832,0.012081619,0.34380704,0.001235826,0.003723036,0.031109994,0.013880966,0.3864608],"study_design_scores_gemma":[0.0000075046323,0.0002553022,0.12655482,0.001877455,0.00004222763,0.0021544658,0.7138665,0.0016455607,0.0011726542,0.006352814,0.14596988,0.00010076888],"about_ca_topic_score_codex":0.0104718525,"about_ca_topic_score_gemma":0.021478698,"teacher_disagreement_score":0.0104718525,"about_ca_system_score_codex":0.0042555043,"about_ca_system_score_gemma":0.008758047,"threshold_uncertainty_score":0.040772498},"labels":[],"label_agreement":null},{"id":"W4390469579","doi":"10.11113/intrest.v17n2.308","title":"Bibliometric Review of Research Trends in Facilities Management Technologies from 2000 to 2023","year":2023,"lang":"en","type":"article","venue":"Malaysian journal of real estate/International journal of real estate studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Emerging technologies; The Internet; Mainland China; Citation; China; Bibliometrics; Computer science; Data science; Facility management; Interoperability; Engineering management; Business; World Wide Web; Geography; Engineering; Marketing","score_opus":0.05272011542931842,"score_gpt":0.3661777685448777,"score_spread":0.3134576531155593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390469579","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038077462,0.9033025,0.0012598933,0.004149549,0.00072723895,0.00022850659,0.03318759,0.00020611176,0.018861244],"genre_scores_gemma":[0.13966529,0.83220345,0.0019867672,0.00068775093,0.0008261295,0.00037221485,0.02248966,0.000066322464,0.0017024799],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98386294,0.0028478396,0.0047098417,0.0012090765,0.0067484993,0.0006218435],"domain_scores_gemma":[0.9259726,0.03896959,0.013202929,0.001628484,0.01916901,0.0010572552],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.010174857,0.0009291632,0.0028117907,0.17147839,0.0011701109,0.0044065304,0.0012799388,0.0008935457,0.004817887],"category_scores_gemma":[0.050734133,0.0005341247,0.0028064356,0.25855824,0.0009889808,0.0043175714,0.0017931183,0.0007711194,0.0012066477],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041511856,0.00010221449,0.083288096,0.24681768,0.0044547743,0.0011773218,0.00228645,0.0016742245,0.0010996914,0.0066217626,0.07193753,0.5801252],"study_design_scores_gemma":[0.000070482514,0.00024129826,0.38193688,0.12759013,0.011305233,0.002402244,0.004701475,0.0016194447,0.0018838228,0.0030120863,0.46503994,0.00019699638],"about_ca_topic_score_codex":0.015608444,"about_ca_topic_score_gemma":0.015843555,"teacher_disagreement_score":0.8285216,"about_ca_system_score_codex":0.0046688546,"about_ca_system_score_gemma":0.010087116,"threshold_uncertainty_score":0.053810418},"labels":[],"label_agreement":null},{"id":"W4390517059","doi":"10.35483/acsa.aia.inter.22.23","title":"Circular Economy Design towards a Resilient Zero Waste Future","year":2022,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"McGill University","funders":"","keywords":"Circular economy; Demolition waste; Demolition; Zero waste; Typology; Municipal solid waste; Waste management; Solid waste management; Stakeholder; Engineering; Construction waste; Stock (firearms); Business; Civil engineering; Environmental planning; Environmental economics; Environmental science; Geography; Economics; Mechanical engineering","score_opus":0.009305100071054331,"score_gpt":0.18394155569588064,"score_spread":0.1746364556248263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390517059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028875077,0.00063592946,0.81414354,0.002667093,0.00016345792,0.000219933,0.00026255695,0.00056130585,0.15247105],"genre_scores_gemma":[0.5463536,0.0011312047,0.4071517,0.0004587852,0.000065720356,0.0005099745,0.00036293312,0.00025083017,0.04371523],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999276,0.0002431059,0.00002267638,0.00012434398,0.00022436988,0.00010954956],"domain_scores_gemma":[0.99938416,0.000101118174,0.0000625852,0.000108449625,0.00024121828,0.00010245619],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013837242,0.00042294493,0.00023244003,0.00083420036,0.0011815885,0.002631221,0.0011893762,0.00080216804,0.009028646],"category_scores_gemma":[0.0013601934,0.00033936294,0.0004071743,0.0006515821,0.0021294116,0.0024297002,0.002661795,0.0007652926,0.001151002],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000043869633,0.00004216038,0.00090850296,0.00009534699,0.000010601023,0.00014968778,0.00043026538,0.06323922,0.0031845896,0.8789561,0.0044701835,0.04846953],"study_design_scores_gemma":[0.00003433658,0.00015518306,0.0011284587,0.00014113524,0.000038689577,0.00029603834,0.0014765387,0.24193618,0.0068649063,0.3767024,0.37117133,0.000054879318],"about_ca_topic_score_codex":0.009064164,"about_ca_topic_score_gemma":0.0118252225,"teacher_disagreement_score":0.009064164,"about_ca_system_score_codex":0.0036370372,"about_ca_system_score_gemma":0.003303581,"threshold_uncertainty_score":0.03020382},"labels":[],"label_agreement":null},{"id":"W4390520494","doi":"10.23977/jaip.2023.060810","title":"The current research status of knowledge graph in bridge and its application prospects","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Current (fluid); Computer science; Graph; Engineering; Theoretical computer science; Electrical engineering; Medicine","score_opus":0.10441379885104311,"score_gpt":0.40917963390742224,"score_spread":0.3047658350563791,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390520494","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038897507,0.5737964,0.23519427,0.041150987,0.0027397638,0.00026716638,0.0013723213,0.0011864399,0.10539521],"genre_scores_gemma":[0.28043917,0.57449126,0.12751776,0.0037558812,0.0025969478,0.0002022205,0.0024341918,0.00020459856,0.00835796],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9978405,0.00068817637,0.0001621967,0.0004768443,0.0006946276,0.00013752648],"domain_scores_gemma":[0.99010956,0.006585651,0.00050123525,0.0005592158,0.0018651107,0.00037926636],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00430251,0.0005555663,0.00073587464,0.006277819,0.0011059842,0.0050686817,0.0018360855,0.0017412497,0.0054970663],"category_scores_gemma":[0.009190819,0.00042197475,0.0008615604,0.009048933,0.0024392481,0.014258472,0.0019171486,0.0017872731,0.0012896777],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007081001,0.00011842828,0.005764973,0.00414944,0.000068231566,0.00028504748,0.0012904812,0.0046625077,0.0010363802,0.22894587,0.02227988,0.7313279],"study_design_scores_gemma":[0.00001639515,0.000120449215,0.004533655,0.0036122482,0.00019242297,0.001015847,0.005656173,0.036607657,0.0023170202,0.29547572,0.6503105,0.0001418972],"about_ca_topic_score_codex":0.007418788,"about_ca_topic_score_gemma":0.0047625285,"teacher_disagreement_score":0.007418788,"about_ca_system_score_codex":0.0023562573,"about_ca_system_score_gemma":0.004077528,"threshold_uncertainty_score":0.022754133},"labels":[],"label_agreement":null},{"id":"W4390556308","doi":"10.32970/cs.2023.1.1","title":"History of Fib International PhD symposia in civil engineering","year":2023,"lang":"en","type":"article","venue":"Vasbetonépítés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Danmarks Tekniske Universitet; Eidgenössische Technische Hochschule Zürich; Technische Universiteit Delft; Budapesti Műszaki és Gazdaságtudományi Egyetem; Université Laval","keywords":"Engineering; Engineering ethics; Library science; Political science; Advice (programming); Engineering management; Computer science","score_opus":0.012980695543062326,"score_gpt":0.19001253532842757,"score_spread":0.17703183978536524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390556308","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011085645,0.19897023,0.00986399,0.035053607,0.087872215,0.00023610715,0.001570062,0.0007954935,0.6545527],"genre_scores_gemma":[0.13734736,0.1288131,0.01154295,0.010467733,0.049568396,0.0004969691,0.002821065,0.00082924135,0.6581132],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9971878,0.0004829526,0.00021704873,0.0004246108,0.001150018,0.0005376267],"domain_scores_gemma":[0.9951155,0.00051356415,0.00026604396,0.0003016657,0.0017572545,0.0020459217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005698578,0.0011002587,0.0007794444,0.005505197,0.0026261942,0.0062967124,0.0013846087,0.0020693333,0.07064663],"category_scores_gemma":[0.005695712,0.00047596046,0.00088129414,0.0037647756,0.0017033014,0.0024930113,0.0058398284,0.002868356,0.027298272],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028499457,0.00024596506,0.0018099255,0.0017052335,0.000034975772,0.00044761685,0.00097242993,0.0006742515,0.001978812,0.06743233,0.5839582,0.3404553],"study_design_scores_gemma":[0.000005525996,0.000037110738,0.0010675343,0.00022736509,0.0000054378133,0.00014379341,0.00012720839,0.000055647793,0.0003550632,0.001400279,0.9965668,0.000008154589],"about_ca_topic_score_codex":0.0016730034,"about_ca_topic_score_gemma":0.002404287,"teacher_disagreement_score":0.07064663,"about_ca_system_score_codex":0.0033851375,"about_ca_system_score_gemma":0.0045099664,"threshold_uncertainty_score":0.23633653},"labels":[],"label_agreement":null},{"id":"W4390650925","doi":"10.23977/jaip.2023.060903","title":"The Role of Artificial Intelligence in Construction Management: A Case Study of Smart Worksite Systems","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering; Knowledge management","score_opus":0.03066380018887798,"score_gpt":0.29638175419797114,"score_spread":0.26571795400909315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390650925","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93626505,0.00028722253,0.007615091,0.0029332119,0.000019555715,0.00024347218,0.00009327944,0.000054418237,0.052488733],"genre_scores_gemma":[0.99000823,0.00029582265,0.0050837076,0.00011879269,0.000010460163,0.00006183866,0.000055850967,0.000019443949,0.004345768],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9956821,0.002925795,0.00012631017,0.00017394603,0.00060117146,0.0004906104],"domain_scores_gemma":[0.9950883,0.0033157251,0.00031859797,0.000428766,0.00039506727,0.00045364545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036121805,0.00038294666,0.00039719266,0.0016446335,0.007356418,0.0050107646,0.0017354814,0.0033455817,0.002739562],"category_scores_gemma":[0.004967331,0.00027195955,0.00045665857,0.003036566,0.0054950095,0.0035364004,0.0033573173,0.0017957182,0.00044169778],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054252613,0.0053479043,0.098683774,0.0008540207,0.00017592665,0.033232052,0.33339804,0.081634924,0.0050773723,0.31525734,0.01865681,0.107139274],"study_design_scores_gemma":[0.00018785923,0.0010565701,0.04501628,0.00040872238,0.00009103914,0.0036629813,0.5738111,0.11723704,0.0048010414,0.038332246,0.21526572,0.00012947344],"about_ca_topic_score_codex":0.022713909,"about_ca_topic_score_gemma":0.048896115,"teacher_disagreement_score":0.022713909,"about_ca_system_score_codex":0.004639331,"about_ca_system_score_gemma":0.0027949295,"threshold_uncertainty_score":0.045163393},"labels":[],"label_agreement":null},{"id":"W4390684474","doi":"10.1590/s1678-86212024000100717","title":"Curricular BIM implementation plan: protocol proposal and pilot application in Brazil","year":2024,"lang":"en","type":"article","venue":"Ambiente Construído","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"","keywords":"Scope (computer science); Engineering management; Plan (archaeology); Curriculum; Competence (human resources); Protocol (science); Action plan; Computer science; Maturity (psychological); Process management; Process (computing); Knowledge management; Engineering; Political science; Management; Pedagogy; Medicine; Psychology","score_opus":0.0073900331987254795,"score_gpt":0.2738910028876137,"score_spread":0.2665009696888882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390684474","genre_codex":"protocol","genre_gemma":"protocol","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"protocol","genre_consensus":"protocol","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031768195,0.00033739387,0.040324885,0.0025092517,0.00043726954,0.90481716,0.004872471,0.0003454633,0.01458794],"genre_scores_gemma":[0.020990929,0.00027975268,0.060354818,0.00043362196,0.00003519416,0.9147104,0.0010582726,0.000031509266,0.0021054272],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.95495194,0.030058421,0.0071649533,0.0016093311,0.0046248087,0.0015906318],"domain_scores_gemma":[0.89220816,0.049269117,0.006580618,0.010934544,0.038251683,0.0027559337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.11240783,0.0010817472,0.00091237505,0.004846426,0.0029038608,0.002585097,0.0020566364,0.0031142593,0.023645386],"category_scores_gemma":[0.102748804,0.0012480292,0.0016669816,0.002632862,0.0025098405,0.0016138202,0.0029502583,0.002818158,0.003773027],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.010105843,0.015900465,0.017954906,0.0346681,0.00030933105,0.0018298129,0.033567503,0.01169685,0.0155011155,0.07288883,0.069612965,0.7159644],"study_design_scores_gemma":[0.01685395,0.02779146,0.07097696,0.040421113,0.0011050077,0.0008212252,0.04047505,0.011893539,0.035517592,0.023849834,0.72964543,0.0006488359],"about_ca_topic_score_codex":0.004970773,"about_ca_topic_score_gemma":0.0074156206,"teacher_disagreement_score":0.11240783,"about_ca_system_score_codex":0.008260414,"about_ca_system_score_gemma":0.040739123,"threshold_uncertainty_score":0.5944766},"labels":[],"label_agreement":null},{"id":"W4390691624","doi":"10.2139/ssrn.4680842","title":"The Durability of Innovative Blocks Through Cyclic Testing and Actual Climate Exposure","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Durability; Forensic engineering; Reliability engineering; Computer science; Engineering; Programming language","score_opus":0.010464945793250685,"score_gpt":0.23333737594421564,"score_spread":0.22287243015096495,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390691624","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99471587,0.00014459535,0.0029673297,0.000018881636,0.000026890062,0.000014688941,0.00029171316,0.00007132707,0.0017486997],"genre_scores_gemma":[0.99852896,0.00003971013,0.0005747632,0.000008167256,0.000003456638,0.0000069718612,0.00010945368,0.000029822264,0.00069873536],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991891,0.00007248562,0.00004078374,0.00014224379,0.00040762644,0.0001478199],"domain_scores_gemma":[0.99806255,0.0005595105,0.00019063955,0.00047063752,0.000613593,0.00010307926],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009119388,0.00037493926,0.00030338904,0.00079696986,0.00043404507,0.0008105839,0.00075613876,0.0007373221,0.0047456096],"category_scores_gemma":[0.0030596938,0.00029643942,0.0003374062,0.0007182344,0.0009255625,0.00093525654,0.0006682968,0.00059883884,0.0004243776],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020744042,0.00045222123,0.022141976,0.00026445815,0.000080368474,0.0006093688,0.0021084594,0.045474585,0.8732441,0.0020100686,0.00091705594,0.050623033],"study_design_scores_gemma":[0.00004565802,0.0028491656,0.08848469,0.00005883009,0.00018652568,0.0006783748,0.0013171158,0.06784945,0.8317035,0.0016841359,0.0050209076,0.0001216954],"about_ca_topic_score_codex":0.0015751056,"about_ca_topic_score_gemma":0.0027421124,"teacher_disagreement_score":0.0047456096,"about_ca_system_score_codex":0.000443826,"about_ca_system_score_gemma":0.000313988,"threshold_uncertainty_score":0.015875638},"labels":[],"label_agreement":null},{"id":"W4390952031","doi":"10.23977/jaip.2023.060813","title":"The Role of Artificial Intelligence in Construction Management: A Case Study of Smart Worksite Systems","year":2023,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Digitization; Context (archaeology); Big data; Cloud computing; Knowledge management; Industry 4.0; Computer science; Quality (philosophy); Data science; Engineering; Telecommunications","score_opus":0.03066380018887798,"score_gpt":0.29638175419797114,"score_spread":0.26571795400909315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4390952031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93626505,0.00028722253,0.007615091,0.0029332119,0.000019555715,0.00024347218,0.00009327944,0.000054418237,0.052488733],"genre_scores_gemma":[0.99000823,0.00029582265,0.0050837076,0.00011879269,0.000010460163,0.00006183866,0.000055850967,0.000019443949,0.004345768],"study_design_codex":"qualitative","study_design_gemma":"case_report","domain_scores_codex":[0.9956821,0.002925795,0.00012631017,0.00017394603,0.00060117146,0.0004906104],"domain_scores_gemma":[0.9950883,0.0033157251,0.00031859797,0.000428766,0.00039506727,0.00045364545],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036121805,0.00038294666,0.00039719266,0.0016446335,0.007356418,0.0050107646,0.0017354814,0.0033455817,0.002739562],"category_scores_gemma":[0.004967331,0.00027195955,0.00045665857,0.003036566,0.0054950095,0.0035364004,0.0033573173,0.0017957182,0.00044169778],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00054252613,0.0053479043,0.098683774,0.0008540207,0.00017592665,0.033232052,0.33339804,0.081634924,0.0050773723,0.31525734,0.01865681,0.107139274],"study_design_scores_gemma":[0.00018785923,0.0010565701,0.04501628,0.00040872238,0.00009103914,0.0036629813,0.5738111,0.11723704,0.0048010414,0.038332246,0.21526572,0.00012947344],"about_ca_topic_score_codex":0.022713909,"about_ca_topic_score_gemma":0.048896115,"teacher_disagreement_score":0.022713909,"about_ca_system_score_codex":0.004639331,"about_ca_system_score_gemma":0.0027949295,"threshold_uncertainty_score":0.045163393},"labels":[],"label_agreement":null},{"id":"W4391039262","doi":"10.1109/smarttechcon57526.2023.10391656","title":"Multiple Target Research of Construction Progress on the Basis of on BIM and Decide Tree Algorithms","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Urbanization; Pace; Computer science; Field (mathematics); Population; Urban planning; Operations research; Architectural engineering; Civil engineering; Engineering; Geography; Economic growth; Economics; Mathematics","score_opus":0.04625676865955494,"score_gpt":0.2926245513470313,"score_spread":0.24636778268747636,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391039262","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051534433,0.0011298853,0.9315299,0.0005864759,0.00008350759,0.00010863466,0.00015156774,0.0004061749,0.014469483],"genre_scores_gemma":[0.68653625,0.0018734571,0.3046554,0.000102802034,0.00009204223,0.00018143031,0.00050395704,0.00015908493,0.0058955676],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99826366,0.0005658234,0.00008747875,0.0003675775,0.00057631894,0.00013914716],"domain_scores_gemma":[0.99600595,0.0024546904,0.00032269972,0.0002597628,0.0008635266,0.000093304996],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035903347,0.00089690124,0.0013012487,0.0042696656,0.0007769368,0.0027303682,0.0017363938,0.0010187916,0.0043330938],"category_scores_gemma":[0.011144098,0.00046576856,0.0011117873,0.0042002113,0.0010511611,0.004959804,0.0014360552,0.0009885108,0.0006105225],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014784491,0.00015074883,0.007417641,0.00030250673,0.00007334505,0.0000980167,0.00033423852,0.59580123,0.0012595325,0.09273582,0.002076943,0.29960215],"study_design_scores_gemma":[0.0000031754582,0.00003860904,0.0006610083,0.000026089323,0.000012584897,0.000028066153,0.000113581016,0.9853882,0.00048699966,0.012135609,0.0010996799,0.0000063210396],"about_ca_topic_score_codex":0.0056109433,"about_ca_topic_score_gemma":0.0044967164,"teacher_disagreement_score":0.0056109433,"about_ca_system_score_codex":0.0016395374,"about_ca_system_score_gemma":0.0018847253,"threshold_uncertainty_score":0.018987715},"labels":[],"label_agreement":null},{"id":"W4391060541","doi":"10.5267/j.uscm.2023.11.010","title":"The impact of digital marketing on the adoption of building information modeling system in Jordanian interior design companies: The moderating role of credibility","year":2024,"lang":"en","type":"article","venue":"Uncertain Supply Chain Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Credibility; Moderation; Structural equation modeling; Marketing; Digital marketing; Social media; Business; Building information modeling; Source credibility; Marketing strategy; Computer science; Engineering; World Wide Web; Operations management","score_opus":0.012316290951532083,"score_gpt":0.22468291579462588,"score_spread":0.2123666248430938,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391060541","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99461114,0.00013443899,0.00031287287,0.0003598951,0.0000035914454,0.00003557627,0.000020260622,0.000005326955,0.0045169406],"genre_scores_gemma":[0.9992418,0.00008431375,0.0002475471,0.000033719403,0.0000037292968,0.000013992955,0.000012946294,0.0000023258046,0.0003596217],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99418664,0.0024894301,0.0005125128,0.00046348677,0.0016390232,0.0007088504],"domain_scores_gemma":[0.9159874,0.05668657,0.015135542,0.0021400962,0.007463169,0.002587258],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00836969,0.00029150565,0.00027303878,0.001820812,0.0010058341,0.0043668705,0.00038863107,0.0008199821,0.0045382055],"category_scores_gemma":[0.039698094,0.0003365735,0.00045456804,0.0014269467,0.0014980942,0.0028280993,0.0016648592,0.0013837919,0.00036074285],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041172619,0.0010612909,0.8964487,0.0002908909,0.000107079446,0.0004932887,0.029601712,0.0009874414,0.0018394972,0.0034644047,0.0003783081,0.06491575],"study_design_scores_gemma":[0.000045514527,0.0009182651,0.9355967,0.00028149644,0.00017190227,0.0003105685,0.0449708,0.005570032,0.003988682,0.0017945012,0.00627608,0.000075442746],"about_ca_topic_score_codex":0.005022732,"about_ca_topic_score_gemma":0.0049941316,"teacher_disagreement_score":0.00836969,"about_ca_system_score_codex":0.0025578495,"about_ca_system_score_gemma":0.004300464,"threshold_uncertainty_score":0.04426366},"labels":[],"label_agreement":null},{"id":"W4391104463","doi":"10.3390/buildings14010285","title":"Design for Manufacturing and Assembly (DfMA) in Construction: A Holistic Review of Current Trends and Future Directions","year":2024,"lang":"en","type":"review","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Sustainability; Thematic analysis; Engineering; Transformative learning; Management science; Process management; Engineering management; Computer science; Qualitative research","score_opus":0.048258504884143315,"score_gpt":0.32543290861704,"score_spread":0.2771744037328967,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391104463","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00044513913,0.9941141,0.0004731726,0.0022976086,0.0003695764,0.0000071545146,0.00001605874,0.000007577378,0.0022696285],"genre_scores_gemma":[0.0046417597,0.99317545,0.0007852273,0.00057871325,0.0003052364,0.000014337222,0.000026129639,0.0000064203978,0.00046677195],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99405473,0.0019152088,0.0009753266,0.0005186247,0.0022639167,0.00027206785],"domain_scores_gemma":[0.9742302,0.020094976,0.0016385365,0.00037994157,0.0031799485,0.0004763397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0072650914,0.0009796917,0.0012599126,0.011135206,0.0013856937,0.0058996896,0.001140816,0.0029635543,0.0039786724],"category_scores_gemma":[0.012029953,0.0006195852,0.0010522914,0.02082524,0.0032487432,0.006579641,0.0020373634,0.002443927,0.00095176685],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045986108,0.00007749969,0.0012604785,0.06185898,0.00010944812,0.00022879444,0.0031551283,0.0011267931,0.0006361046,0.04510034,0.025550947,0.86084956],"study_design_scores_gemma":[0.0000059906492,0.00008928701,0.0031069135,0.054394864,0.00013302534,0.0007366474,0.0038532119,0.0003211071,0.00034739083,0.0117263645,0.92523676,0.000048469377],"about_ca_topic_score_codex":0.005894158,"about_ca_topic_score_gemma":0.009937399,"teacher_disagreement_score":0.011135206,"about_ca_system_score_codex":0.0048987297,"about_ca_system_score_gemma":0.012565552,"threshold_uncertainty_score":0.03842193},"labels":[],"label_agreement":null},{"id":"W4391319575","doi":"10.18280/mmep.110123","title":"A Novel Time Management Approach for the Construction Industry: A Mathematical Analysis","year":2024,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Management science; Operations research; Engineering","score_opus":0.0188388119743645,"score_gpt":0.20018107945758934,"score_spread":0.18134226748322485,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391319575","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002386845,0.0005050761,0.9904669,0.00047471316,0.00009692403,0.000018234427,0.00002628052,0.000024235651,0.0060006934],"genre_scores_gemma":[0.39963654,0.005257055,0.54284817,0.00071564544,0.0014548588,0.00040980816,0.0001735385,0.00036576745,0.049138635],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991937,0.00022029929,0.00004331266,0.00016685648,0.0003124781,0.00006328478],"domain_scores_gemma":[0.9993605,0.00027277498,0.00012285181,0.00004595385,0.00013622234,0.00006176646],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012099267,0.0011416255,0.0008521086,0.0014157136,0.0008609392,0.0023183632,0.0020012113,0.0015770904,0.0050662486],"category_scores_gemma":[0.0024568792,0.0005197983,0.0014628266,0.0016292211,0.0013678364,0.004292863,0.0023014983,0.0021558336,0.0008391636],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017023134,0.00006826718,0.00026906413,0.0001576547,0.000035837995,0.000103570404,0.00016033238,0.267932,0.002702343,0.6944324,0.002833993,0.031287506],"study_design_scores_gemma":[0.000004793903,0.000029697474,0.00010819812,0.000019998459,0.000018675595,0.0000871543,0.000034070537,0.8805326,0.00034945286,0.11283576,0.0059632617,0.000016271973],"about_ca_topic_score_codex":0.0024000052,"about_ca_topic_score_gemma":0.0026564354,"teacher_disagreement_score":0.0050662486,"about_ca_system_score_codex":0.0017564605,"about_ca_system_score_gemma":0.0017939865,"threshold_uncertainty_score":0.016948283},"labels":[],"label_agreement":null},{"id":"W4391381579","doi":"10.1109/wsc60868.2023.10407243","title":"Integrated Analysis and Simulation for Enhancing Wall Assembly Process Efficiency by Resolving Bottlenecks","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Bottleneck; Process (computing); Workflow; Computer science; Resource (disambiguation); sync; Workstation; Idle; Resource efficiency; Production (economics); Scope (computer science); Manufacturing engineering; Process engineering; Engineering; Operating system; Embedded system","score_opus":0.008264913984671683,"score_gpt":0.2494455242277185,"score_spread":0.24118061024304682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391381579","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30974638,0.00044463552,0.66689396,0.0004033367,0.000110179135,0.00023473128,0.0003463119,0.0019691493,0.019851439],"genre_scores_gemma":[0.9108543,0.00028145066,0.08595073,0.000031204905,0.000012984021,0.0002063259,0.00023001738,0.00010264396,0.0023302592],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968433,0.000107494154,0.000018257031,0.00003812473,0.00008885187,0.00006287275],"domain_scores_gemma":[0.9992685,0.00045842535,0.00005402557,0.000058267236,0.00012070466,0.000040086412],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008351766,0.00069427537,0.000839926,0.00085958675,0.00057637435,0.001281073,0.00076635485,0.0011114039,0.003079791],"category_scores_gemma":[0.0017182227,0.0004790974,0.0008923907,0.0007878457,0.00051778473,0.0008377251,0.000838652,0.0006476732,0.0002973988],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000051520277,0.000055703622,0.0008804407,0.00003478763,0.000011101376,0.000029335779,0.000044359622,0.99080163,0.001520173,0.0020742675,0.00010120695,0.0043954644],"study_design_scores_gemma":[0.000004888338,0.000012277098,0.000091249094,0.000003153209,0.00000385017,0.0000026787109,0.000010244828,0.9988702,0.00039021767,0.0003798157,0.00022916186,0.0000023392872],"about_ca_topic_score_codex":0.012704142,"about_ca_topic_score_gemma":0.007936864,"teacher_disagreement_score":0.012704142,"about_ca_system_score_codex":0.0008655034,"about_ca_system_score_gemma":0.0019013915,"threshold_uncertainty_score":0.025260389},"labels":[],"label_agreement":null},{"id":"W4391381690","doi":"10.1109/wsc60868.2023.10407712","title":"Simulation Modeling For Sustainable Construction: A Case Study To Highlight The Social Aspect","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Flexibility (engineering); Workload; Resource (disambiguation); Computer science; Idle; Component (thermodynamics); Discrete event simulation; Product (mathematics); Resource allocation; Manufacturing engineering; Operations research; Engineering; Simulation; Operating system; Computer network","score_opus":0.023815134682976257,"score_gpt":0.28320866307155784,"score_spread":0.2593935283885816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391381690","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8152943,0.00051875046,0.14410464,0.0015329067,0.00009740166,0.00038621668,0.0007406388,0.00034733588,0.03697781],"genre_scores_gemma":[0.95818347,0.0004887554,0.03600943,0.00004639538,0.000014337804,0.00022950686,0.00023956191,0.000053076423,0.00473541],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930286,0.00038104074,0.00002922725,0.000051957424,0.00014168808,0.00009325315],"domain_scores_gemma":[0.9981895,0.0013089762,0.00008483746,0.00010058916,0.00018156141,0.00013445562],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010276004,0.00060230447,0.00054484856,0.0006373865,0.001157203,0.0016449232,0.0011070727,0.001848068,0.003062734],"category_scores_gemma":[0.001707817,0.0003377034,0.0007872037,0.0011498558,0.0007572987,0.00075939985,0.00096742087,0.0009711787,0.00026425222],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006062527,0.00017551992,0.0034145536,0.00007410374,0.000025631094,0.0005395753,0.00033253428,0.9807748,0.0014561658,0.007440123,0.0005245905,0.0051818592],"study_design_scores_gemma":[0.0000270649,0.00007863768,0.000771981,0.000021012936,0.000016112528,0.00006031476,0.0004722042,0.99087346,0.0013501308,0.0024526664,0.003858573,0.000017805001],"about_ca_topic_score_codex":0.01643607,"about_ca_topic_score_gemma":0.025088351,"teacher_disagreement_score":0.01643607,"about_ca_system_score_codex":0.001485286,"about_ca_system_score_gemma":0.0019198816,"threshold_uncertainty_score":0.03268081},"labels":[],"label_agreement":null},{"id":"W4391382594","doi":"10.1109/wsc60868.2023.10407242","title":"Hybrid Approaches For Handling Mobile Crane Location Problems In Construction Sites","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Boom; Modular design; Heuristics; Lift (data mining); Bridge (graph theory); Computer science; Plan (archaeology); Grid; Engineering; Mathematical optimization; Mathematics","score_opus":0.02875393550814201,"score_gpt":0.21414572928714054,"score_spread":0.18539179377899853,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391382594","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018601248,0.00047747104,0.9758499,0.00014308143,0.000046892208,0.0001274976,0.000088743895,0.00024711105,0.004418019],"genre_scores_gemma":[0.36890805,0.00070323027,0.6256051,0.00011113225,0.00007908478,0.00046801878,0.00028511783,0.00016704356,0.0036732994],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993463,0.00023226255,0.00003408116,0.00011735119,0.00014565965,0.00012425326],"domain_scores_gemma":[0.9987754,0.0008066743,0.00012413468,0.000098742916,0.00011804878,0.000076985736],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012207237,0.0014199391,0.0014201656,0.0017903417,0.0007700444,0.0020152759,0.002480419,0.0018164954,0.004662194],"category_scores_gemma":[0.0021557258,0.000963702,0.0015761325,0.002171775,0.00084583036,0.0016452216,0.0020691454,0.0013042047,0.0006031716],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036485664,0.00007082751,0.00044509696,0.00013592925,0.000052261006,0.00009329672,0.00007229565,0.9600417,0.00095881405,0.011475694,0.00057112594,0.026046399],"study_design_scores_gemma":[0.0000138113,0.000041560084,0.00009732902,0.000016572993,0.000016068028,0.000035321573,0.0000627872,0.9916353,0.00032208988,0.006622635,0.0011286046,0.000007888271],"about_ca_topic_score_codex":0.005589395,"about_ca_topic_score_gemma":0.008232959,"teacher_disagreement_score":0.005589395,"about_ca_system_score_codex":0.0009882485,"about_ca_system_score_gemma":0.0014433998,"threshold_uncertainty_score":0.015596569},"labels":[],"label_agreement":null},{"id":"W4391409121","doi":"10.1109/wsc60868.2023.10407539","title":"A Hybrid Simulation-Based Optimization Framework For Managing Modular Bridge Construction Projects: A Cable-Stayed Bridge Case Study","year":2023,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Bridge (graph theory); Schedule; Performance indicator; Scalability; Key (lock); Discrete event simulation; Systems engineering; Computer science; Supply chain; Engineering; Industrial engineering; Reliability engineering; Simulation; Operating system","score_opus":0.030361656467051662,"score_gpt":0.27619528277036753,"score_spread":0.24583362630331587,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391409121","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.114149444,0.0007995841,0.8582235,0.00091608096,0.00006804805,0.00028085042,0.00036987927,0.0003616787,0.024830908],"genre_scores_gemma":[0.86862063,0.00062211294,0.12587863,0.00007185174,0.00002696795,0.00040655804,0.00024129199,0.00006532699,0.0040667593],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994306,0.00029034767,0.000021463735,0.00006114945,0.0000963619,0.00010006187],"domain_scores_gemma":[0.999448,0.00032459406,0.00005803711,0.000020470086,0.00009522365,0.00005373578],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011756842,0.0010863846,0.0009824286,0.00097503496,0.0006479446,0.001640522,0.0012237722,0.0014580757,0.0027064777],"category_scores_gemma":[0.001310836,0.0005609655,0.001126304,0.0009023091,0.0006947751,0.00063846534,0.001227819,0.0008494678,0.00016944032],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000113894575,0.000017004377,0.00017258977,0.00001370643,0.000009444067,0.000038349022,0.000013300003,0.99527884,0.00015498832,0.0030357467,0.00006885841,0.0011858251],"study_design_scores_gemma":[0.0000063864245,0.000010977589,0.00005707732,0.000004715175,0.0000052913874,0.000005648537,0.000015489239,0.9986222,0.000076082084,0.00087065436,0.00032204387,0.0000034854165],"about_ca_topic_score_codex":0.024359597,"about_ca_topic_score_gemma":0.01787694,"teacher_disagreement_score":0.024359597,"about_ca_system_score_codex":0.0016299776,"about_ca_system_score_gemma":0.0027277777,"threshold_uncertainty_score":0.04843557},"labels":[],"label_agreement":null},{"id":"W4391424974","doi":"10.1007/978-3-031-35471-7_29","title":"Lifting and Rigging Study for Precast Volumetric Modular Construction in Nunavut","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Modular design; Architectural engineering; Computer science; Engineering; Civil engineering; Geology; Construction engineering; Programming language","score_opus":0.007524085791174915,"score_gpt":0.19599478258015463,"score_spread":0.1884706967889797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391424974","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9346574,0.0007250895,0.01736287,0.000050911844,0.000023327977,0.000030484143,0.00008787169,0.000046577286,0.047015656],"genre_scores_gemma":[0.98078245,0.0002404848,0.004852528,0.000005928003,0.000002714532,0.0000061475453,0.00006320647,0.000019377465,0.0140271615],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99988496,0.00001453952,0.0000036820888,0.00002343137,0.000042167012,0.000031171458],"domain_scores_gemma":[0.99990594,0.000035297977,0.00000826278,0.000013642498,0.000029834153,0.0000070383526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00020566591,0.0002610524,0.00029920015,0.00060430117,0.0009107023,0.00072917074,0.00080894766,0.00031239088,0.0048637325],"category_scores_gemma":[0.00044471197,0.00023079437,0.0003670923,0.0007382041,0.0006646243,0.00048210265,0.0004233642,0.00034827308,0.00037613482],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00067582884,0.0004823967,0.03773274,0.00045966747,0.000048946866,0.0023116858,0.0054542394,0.39543992,0.09857576,0.1818784,0.0021758974,0.27476445],"study_design_scores_gemma":[0.000019296756,0.00068821304,0.12392489,0.00018747586,0.000100106394,0.0011810741,0.009702806,0.76232946,0.04100068,0.031209087,0.029555688,0.000101166115],"about_ca_topic_score_codex":0.061975457,"about_ca_topic_score_gemma":0.102670476,"teacher_disagreement_score":0.9380245,"about_ca_system_score_codex":0.0010016327,"about_ca_system_score_gemma":0.0011667768,"threshold_uncertainty_score":0.123229444},"labels":[],"label_agreement":null},{"id":"W4391425075","doi":"10.1007/978-3-031-35471-7","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Victoria; University of Regina; University of British Columbia, Okanagan Campus; University of British Columbia; University of Northern British Columbia","funders":"","keywords":"Political science; Engineering ethics; Library science; Engineering; Environmental ethics; Computer science; Philosophy","score_opus":0.0048875313991533055,"score_gpt":0.17312680135073075,"score_spread":0.16823926995157745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391425075","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030416942,0.011196141,0.0020287428,0.026434664,0.04682545,0.0001352289,0.0024906045,0.0004195633,0.90742785],"genre_scores_gemma":[0.0036492816,0.0030943728,0.0005358901,0.0005106552,0.0006778403,0.000019676289,0.0008326461,0.00009874296,0.990581],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984792,0.00007458554,0.000024775489,0.000086913155,0.0010943299,0.00024022427],"domain_scores_gemma":[0.99801815,0.000049783466,0.000017222814,0.000048985057,0.0014203578,0.0004455079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015486157,0.0010944282,0.0006827052,0.001818633,0.0036570514,0.0057662684,0.0012179821,0.0018787392,0.24419215],"category_scores_gemma":[0.0013980557,0.0004067677,0.00048519325,0.0022062652,0.0012538532,0.0011985285,0.0019474706,0.0017132276,0.07255723],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016326178,0.000019836629,0.0001554721,0.00003398883,0.0000024629762,0.000029067724,0.000040893738,0.0000927768,0.00018153075,0.0019969677,0.9691618,0.028268808],"study_design_scores_gemma":[0.0000022848665,0.0000035498153,0.0005073781,0.0000297011,0.0000022125273,0.000012135106,0.000118782315,0.00010135709,0.000090591755,0.0003035296,0.99882346,0.0000049482815],"about_ca_topic_score_codex":0.56322753,"about_ca_topic_score_gemma":0.8209518,"teacher_disagreement_score":0.9903417,"about_ca_system_score_codex":0.009658305,"about_ca_system_score_gemma":0.03211508,"threshold_uncertainty_score":0.8786894},"labels":[],"label_agreement":null},{"id":"W4391482388","doi":"10.1016/j.jobe.2024.108647","title":"An OpenBIM-based 4D approach to support coordination meetings in virtual reality environments","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":14,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Virtual reality; Visualization; Computer science; Human–computer interaction; Schedule; Building information modeling; Virtual machine; Engineering; Scheduling (production processes); Artificial intelligence","score_opus":0.010455276638327734,"score_gpt":0.23419643450127747,"score_spread":0.22374115786294974,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391482388","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009121714,0.0000867315,0.9786862,0.00008527073,0.000052296036,0.00016608366,0.000115021605,0.003592318,0.008094287],"genre_scores_gemma":[0.11959543,0.00014276226,0.8729389,0.000055923243,0.000017824863,0.00040449633,0.0004154549,0.00033156583,0.00609767],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989415,0.00033935913,0.00007137845,0.00014526334,0.00039507085,0.00010750303],"domain_scores_gemma":[0.9994431,0.00015799787,0.000043520748,0.00016058995,0.00011457991,0.00008015707],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009690366,0.00075193995,0.00062031945,0.0012973987,0.00077146303,0.002106514,0.0019767336,0.0012370616,0.010065873],"category_scores_gemma":[0.0017431712,0.00064946513,0.00088943786,0.0008746885,0.0006448123,0.0015576311,0.0038241588,0.0007526772,0.0022192672],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073723815,0.0007510411,0.0024639782,0.0010148599,0.00012315522,0.00095536624,0.00509015,0.14321113,0.084575854,0.09800326,0.0125672035,0.65050685],"study_design_scores_gemma":[0.00015122152,0.00035287268,0.0018112808,0.00017689151,0.00009040362,0.0005681079,0.00086568133,0.7800672,0.03558137,0.025009792,0.15516579,0.00015936057],"about_ca_topic_score_codex":0.0032234953,"about_ca_topic_score_gemma":0.0038191369,"teacher_disagreement_score":0.010065873,"about_ca_system_score_codex":0.000585288,"about_ca_system_score_gemma":0.0011043935,"threshold_uncertainty_score":0.033673763},"labels":[],"label_agreement":null},{"id":"W4391526629","doi":"","title":"Illustration et recommandations d’un chantier avec recyclage et abaissement de la température","year":2022,"lang":"fr","type":"article","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Art","score_opus":0.00803861649421637,"score_gpt":0.2166376959075715,"score_spread":0.20859907941335515,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391526629","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049086113,0.03430089,0.116447575,0.3440928,0.041133743,0.0015246879,0.0017660058,0.0046600904,0.40698808],"genre_scores_gemma":[0.3475339,0.027204875,0.120361164,0.08924119,0.010440154,0.0033343304,0.0026076175,0.0016939676,0.3975828],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.98143816,0.0049529015,0.0018601194,0.001732132,0.008557572,0.0014591399],"domain_scores_gemma":[0.976699,0.011357897,0.0012849843,0.0022082976,0.0074132853,0.001036521],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020290641,0.0009871188,0.00065273594,0.0018640636,0.0031497648,0.008143132,0.0038139755,0.015313981,0.017210148],"category_scores_gemma":[0.0445242,0.0006107748,0.00242178,0.0011233157,0.004100307,0.004524311,0.004165392,0.009567439,0.005483868],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013251865,0.0012778995,0.008940897,0.0034460588,0.00020050225,0.008177552,0.007934741,0.008083509,0.030456206,0.21140341,0.38069174,0.33806223],"study_design_scores_gemma":[0.00007323945,0.00028827292,0.0024827973,0.001373095,0.000074600684,0.0011746133,0.0008798332,0.001160835,0.0069680866,0.0070657455,0.978377,0.00008186878],"about_ca_topic_score_codex":0.020789351,"about_ca_topic_score_gemma":0.017781205,"teacher_disagreement_score":0.020789351,"about_ca_system_score_codex":0.0033327292,"about_ca_system_score_gemma":0.009276752,"threshold_uncertainty_score":0.10730845},"labels":[],"label_agreement":null},{"id":"W4391532795","doi":"10.1007/978-3-031-34027-7","title":"Proceedings of the Canadian Society of Civil Engineering Annual Conference 2022","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University; University of Northern British Columbia; University of Victoria; University of Regina; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Political science; Engineering ethics; Engineering; Environmental ethics; Library science; Computer science; Philosophy","score_opus":0.0048875313991533055,"score_gpt":0.17312680135073075,"score_spread":0.16823926995157745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391532795","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030416942,0.011196141,0.0020287428,0.026434664,0.04682545,0.0001352289,0.0024906045,0.0004195633,0.90742785],"genre_scores_gemma":[0.0036492816,0.0030943728,0.0005358901,0.0005106552,0.0006778403,0.000019676289,0.0008326461,0.00009874296,0.990581],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984792,0.00007458554,0.000024775489,0.000086913155,0.0010943299,0.00024022427],"domain_scores_gemma":[0.99801815,0.000049783466,0.000017222814,0.000048985057,0.0014203578,0.0004455079],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015486157,0.0010944282,0.0006827052,0.001818633,0.0036570514,0.0057662684,0.0012179821,0.0018787392,0.24419215],"category_scores_gemma":[0.0013980557,0.0004067677,0.00048519325,0.0022062652,0.0012538532,0.0011985285,0.0019474706,0.0017132276,0.07255723],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016326178,0.000019836629,0.0001554721,0.00003398883,0.0000024629762,0.000029067724,0.000040893738,0.0000927768,0.00018153075,0.0019969677,0.9691618,0.028268808],"study_design_scores_gemma":[0.0000022848665,0.0000035498153,0.0005073781,0.0000297011,0.0000022125273,0.000012135106,0.000118782315,0.00010135709,0.000090591755,0.0003035296,0.99882346,0.0000049482815],"about_ca_topic_score_codex":0.56322753,"about_ca_topic_score_gemma":0.8209518,"teacher_disagreement_score":0.9903417,"about_ca_system_score_codex":0.009658305,"about_ca_system_score_gemma":0.03211508,"threshold_uncertainty_score":0.8786894},"labels":[],"label_agreement":null},{"id":"W4391537168","doi":"10.54254/3006-1210/direct/0718","title":"How does artificial intelligence affect reliable engineering?","year":2024,"lang":"en","type":"article","venue":"Advances in Operation Research and Production Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"","keywords":"Affect (linguistics); Artificial intelligence; Computer science; Psychology","score_opus":0.021413498853558897,"score_gpt":0.30926826513267214,"score_spread":0.2878547662791132,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391537168","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010087217,0.12334088,0.061052702,0.5936823,0.010356648,0.00007279178,0.0001902468,0.00040340997,0.2008138],"genre_scores_gemma":[0.61850375,0.16711493,0.058259834,0.095559575,0.01898488,0.00036583425,0.00024690482,0.0006670389,0.040297266],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.98843956,0.005895052,0.00043936647,0.0012061584,0.0033381456,0.0006816941],"domain_scores_gemma":[0.96647257,0.024919014,0.0013494914,0.0023294117,0.0038925535,0.0010368917],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.015743848,0.0010736934,0.0010399737,0.0023475953,0.0029148157,0.010640271,0.0018662127,0.006995808,0.006113552],"category_scores_gemma":[0.041364226,0.00050692866,0.0007430522,0.001885479,0.0218877,0.016682575,0.0050543076,0.008082441,0.0028164391],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045208635,0.000056234516,0.0012015331,0.00044467242,0.000064662105,0.00015232166,0.0011396714,0.0034530952,0.00019899882,0.8946968,0.031983554,0.066563316],"study_design_scores_gemma":[0.000014261789,0.00003206269,0.0003461704,0.0004357923,0.000012909519,0.000091446964,0.0006222445,0.0018376007,0.000248714,0.86164784,0.13467857,0.000032369928],"about_ca_topic_score_codex":0.0030171403,"about_ca_topic_score_gemma":0.0015308412,"teacher_disagreement_score":0.015743848,"about_ca_system_score_codex":0.0039590327,"about_ca_system_score_gemma":0.0033355705,"threshold_uncertainty_score":0.08326244},"labels":[],"label_agreement":null},{"id":"W4391546788","doi":"10.1007/978-3-031-34027-7_33","title":"Prefabrication and Modular Construction—A Potential Solution to Affordable and Temporary Housing in Ontario?","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Prefabrication; Affordable housing; Modular design; Architectural engineering; Business; Civil engineering; Engineering; Construction engineering; Computer science; Programming language","score_opus":0.005897406704342116,"score_gpt":0.17094200283219266,"score_spread":0.16504459612785055,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391546788","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13988218,0.011441244,0.013279771,0.025014115,0.0009815797,0.00012837055,0.00059494405,0.00024059451,0.8084372],"genre_scores_gemma":[0.23791333,0.008540429,0.010570783,0.0007141667,0.000080009384,0.000030162948,0.00027808273,0.000083413965,0.74178964],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9996284,0.000016073318,0.000007411478,0.000038495607,0.00016453238,0.00014506989],"domain_scores_gemma":[0.99983895,0.000008032049,0.000012269378,0.000016432497,0.00006934338,0.00005496552],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030865072,0.00037040142,0.00015163966,0.00043729605,0.0034150244,0.0026628799,0.0009545061,0.000957417,0.025659053],"category_scores_gemma":[0.00036681382,0.0002780339,0.00028765542,0.0011781893,0.0016441655,0.001336082,0.001193435,0.00069279614,0.0016955999],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000133633,0.00009121769,0.010427721,0.00041468756,0.000013119154,0.0011574037,0.010003335,0.002136002,0.0096110385,0.3647387,0.1651716,0.43610162],"study_design_scores_gemma":[0.000007661707,0.00004695554,0.015394617,0.000114529714,0.000008395766,0.00041621795,0.0055016223,0.0011092314,0.0009389224,0.0070204837,0.9694175,0.000023841796],"about_ca_topic_score_codex":0.90991724,"about_ca_topic_score_gemma":0.9862938,"teacher_disagreement_score":0.090082765,"about_ca_system_score_codex":0.017763926,"about_ca_system_score_gemma":0.029368235,"threshold_uncertainty_score":0.18122649},"labels":[],"label_agreement":null},{"id":"W4391564779","doi":"10.36680/j.itcon.2024.002","title":"Construction 4.0: A comparative analysis of research and practice","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Engineering; Engineering ethics","score_opus":0.021983456786992893,"score_gpt":0.32980386802271755,"score_spread":0.3078204112357247,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391564779","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.39747095,0.38251746,0.012564806,0.016869193,0.00069032446,0.0006441479,0.0013684324,0.00013801493,0.18773668],"genre_scores_gemma":[0.8731712,0.11195659,0.0109119015,0.00091267296,0.00017133365,0.00042163453,0.00052026374,0.0000827747,0.0018516657],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9636128,0.018511627,0.003543878,0.0020145965,0.010861779,0.0014552746],"domain_scores_gemma":[0.8740549,0.10209628,0.006921738,0.0027608983,0.0127198845,0.00144637],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.036447316,0.0004680558,0.0010269622,0.044768237,0.0023463739,0.010856741,0.0012599011,0.0020415238,0.005111634],"category_scores_gemma":[0.0658357,0.0004803414,0.0008050347,0.059716165,0.006133974,0.010032326,0.005574073,0.0009834733,0.00049439067],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046220867,0.00026579978,0.045805685,0.024361601,0.00046818942,0.0006451034,0.14663142,0.0012340243,0.0010567629,0.26780194,0.009579061,0.5016882],"study_design_scores_gemma":[0.00008605404,0.00064904086,0.15429583,0.050635323,0.0005547603,0.0008933431,0.45666018,0.0018021711,0.0014397925,0.03137364,0.30145708,0.00015273697],"about_ca_topic_score_codex":0.006705397,"about_ca_topic_score_gemma":0.010146644,"teacher_disagreement_score":0.044768237,"about_ca_system_score_codex":0.013984376,"about_ca_system_score_gemma":0.018055331,"threshold_uncertainty_score":0.19275415},"labels":[],"label_agreement":null},{"id":"W4391696891","doi":"10.1109/tem.2024.3364168","title":"The Role of Smart Heuristics in Decision-Making Under Uncertainty: Migitating Rework and Its Consequences","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Rework; Heuristics; Computer science; Operations research; Management science; Knowledge management; Manufacturing engineering; Engineering; Risk analysis (engineering); Process management; Business","score_opus":0.0057650174844591975,"score_gpt":0.21283416492539647,"score_spread":0.20706914744093727,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391696891","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11099323,0.0009102577,0.8632473,0.004092938,0.00011357422,0.00024649687,0.00015945738,0.00014105278,0.020095602],"genre_scores_gemma":[0.8344698,0.00040349102,0.1639072,0.00025668566,0.000036474925,0.00018309489,0.000073719544,0.00003453413,0.0006349676],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9893299,0.0068959985,0.00056434935,0.0012549255,0.0012502341,0.0007046608],"domain_scores_gemma":[0.964355,0.025749842,0.004315425,0.003432208,0.0013509388,0.00079665496],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012983915,0.0010072154,0.0012535177,0.0034761655,0.0018862715,0.00794184,0.0022438916,0.0032828974,0.0023343696],"category_scores_gemma":[0.04460746,0.0007919529,0.0015879514,0.0033606533,0.015508242,0.009353879,0.0033492155,0.0029225172,0.0002309608],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010977277,0.00008427157,0.005383655,0.00024671707,0.00017578484,0.00055838947,0.003433874,0.18270175,0.0005215838,0.77343607,0.00047600226,0.032872085],"study_design_scores_gemma":[0.000023098282,0.00007107278,0.0011350837,0.00010998208,0.000038358918,0.00011980198,0.0012164845,0.095063664,0.00031791948,0.89929044,0.0025569578,0.000057084846],"about_ca_topic_score_codex":0.0052695386,"about_ca_topic_score_gemma":0.0069305706,"teacher_disagreement_score":0.012983915,"about_ca_system_score_codex":0.0043409,"about_ca_system_score_gemma":0.0042580324,"threshold_uncertainty_score":0.06866634},"labels":[],"label_agreement":null},{"id":"W4391707230","doi":"10.1061/jcemd4.coeng-13915","title":"Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Duration (music); Estimation; Scaffold; Statistics; Mathematics; Engineering; Art; Biomedical engineering; Systems engineering","score_opus":0.013689525768489887,"score_gpt":0.23306286990129885,"score_spread":0.21937334413280896,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391707230","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96718484,0.00014451431,0.030311532,0.00012562674,0.000009291248,0.00012679656,0.0005860878,0.0001172483,0.0013939439],"genre_scores_gemma":[0.9655289,0.00019071325,0.032118477,0.000012151715,0.00001167258,0.00012205228,0.0007343587,0.000035412933,0.0012462084],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985152,0.00054265466,0.00012599489,0.00028369107,0.00041826782,0.00011428701],"domain_scores_gemma":[0.9894462,0.006818761,0.0012331795,0.0006669853,0.0014790322,0.0003558422],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026684783,0.00063108915,0.0004964371,0.0020647882,0.00059716374,0.0008099484,0.0012423369,0.00082721206,0.0012314228],"category_scores_gemma":[0.008614985,0.0003198543,0.00053598714,0.0023239108,0.0004672757,0.000809327,0.0006248498,0.0006731132,0.00030763453],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009361315,0.0021310716,0.3852423,0.0011338011,0.00021813763,0.008361931,0.009145874,0.2850019,0.01407947,0.0041517993,0.004183341,0.28541422],"study_design_scores_gemma":[0.000069463305,0.0021766904,0.27490255,0.00023455382,0.00015752621,0.0020679228,0.011510806,0.6809951,0.014231764,0.0033213806,0.01011485,0.00021738038],"about_ca_topic_score_codex":0.013457618,"about_ca_topic_score_gemma":0.019921657,"teacher_disagreement_score":0.013457618,"about_ca_system_score_codex":0.0011572229,"about_ca_system_score_gemma":0.0010941166,"threshold_uncertainty_score":0.026758611},"labels":[],"label_agreement":null},{"id":"W4391747171","doi":"10.3390/buildings14020496","title":"Full-Scale Implementation of an Automated Connecting Device for Modular Construction","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Cable gland; Systems engineering; Process (computing); Modular construction; Scale (ratio); Engineering; Computer science; Field (mathematics); Embedded system; Mechanical engineering; Operating system","score_opus":0.00874303277083623,"score_gpt":0.2810730989304804,"score_spread":0.27233006615964417,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391747171","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7457247,0.000085115695,0.23781888,0.000084704014,0.00007597476,0.0007642627,0.0004720904,0.0028643236,0.012109892],"genre_scores_gemma":[0.80648714,0.000070453956,0.18960266,0.000024395138,0.0000079766405,0.000463364,0.0003191895,0.00011211324,0.002912734],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9987923,0.0002816501,0.00006193119,0.00015472723,0.00054772396,0.00016171862],"domain_scores_gemma":[0.998251,0.00029173374,0.0001555471,0.0008245464,0.00034353414,0.00013362468],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018460627,0.0006712477,0.00032695872,0.0007443236,0.00042599603,0.0008716787,0.0012799937,0.0006793199,0.0041145124],"category_scores_gemma":[0.0022443933,0.00029059578,0.0003870228,0.0005286714,0.00069366826,0.0009232501,0.0011457365,0.00057639304,0.001035361],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007107449,0.0022305406,0.01882698,0.00086904323,0.00006976565,0.0010374867,0.0012578296,0.082693845,0.5172987,0.014489066,0.0037810802,0.35673484],"study_design_scores_gemma":[0.00032345144,0.012601093,0.06911927,0.00022765399,0.0001965677,0.0018271051,0.0010565749,0.19457985,0.6122471,0.0041919085,0.103308834,0.00032061583],"about_ca_topic_score_codex":0.00057137583,"about_ca_topic_score_gemma":0.0010059894,"teacher_disagreement_score":0.0041145124,"about_ca_system_score_codex":0.00045781687,"about_ca_system_score_gemma":0.0010044867,"threshold_uncertainty_score":0.013764381},"labels":[],"label_agreement":null},{"id":"W4391909581","doi":"10.5267/j.jpm.2024.1.001","title":"Project management approaches and their selection in the digital age: Overview, challenges and decision models","year":2024,"lang":"en","type":"article","venue":"Journal of Project Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Selection (genetic algorithm); Computer science; Data science; Management science; Engineering; Artificial intelligence","score_opus":0.06321626924180404,"score_gpt":0.2553401872433735,"score_spread":0.19212391800156944,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4391909581","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08319872,0.013775051,0.8521396,0.01045646,0.00016457104,0.0014973616,0.0005417274,0.0003082913,0.037918195],"genre_scores_gemma":[0.36849657,0.011763754,0.613491,0.00032885204,0.00010736851,0.0013098943,0.00067950395,0.00008274969,0.0037403333],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.97569263,0.01329619,0.0023339991,0.0019023828,0.0059758117,0.0007989656],"domain_scores_gemma":[0.9645435,0.026590245,0.003015072,0.0013274392,0.0036915657,0.0008321983],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021404965,0.0010219817,0.0011177453,0.00580688,0.0014980508,0.012501621,0.0028352072,0.0019051342,0.0026726553],"category_scores_gemma":[0.025694124,0.0009986721,0.0015087166,0.0077302917,0.0033521324,0.010654773,0.0042931437,0.002817054,0.000856185],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000177265,0.00056469167,0.0138177015,0.002236033,0.0001672001,0.00032864817,0.004052667,0.089686304,0.0010395932,0.44905016,0.004368652,0.43451113],"study_design_scores_gemma":[0.00007600145,0.00030918114,0.0059318836,0.0021836401,0.00009128179,0.00058252667,0.007379076,0.3630036,0.0020956697,0.5429177,0.075229324,0.0002000131],"about_ca_topic_score_codex":0.003561548,"about_ca_topic_score_gemma":0.0028986684,"teacher_disagreement_score":0.021404965,"about_ca_system_score_codex":0.0063195396,"about_ca_system_score_gemma":0.0055171014,"threshold_uncertainty_score":0.11320162},"labels":[],"label_agreement":null},{"id":"W4392108726","doi":"10.5430/ijba.v15n1p21","title":"Analysis of Critical Factors and Strategies for Implementing and Using BIM in the Public Sector","year":2024,"lang":"en","type":"article","venue":"International Journal of Business Administration","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Public sector; Computer science; Business; Risk analysis (engineering); Process management; Industrial organization; Environmental economics; Economics; Economy","score_opus":0.045254711725430684,"score_gpt":0.32674000073798687,"score_spread":0.2814852890125562,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392108726","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9591126,0.0012828768,0.0072371443,0.004852269,0.00002681858,0.0004710858,0.000090113674,0.000052884643,0.026874116],"genre_scores_gemma":[0.9951337,0.0006323213,0.0033931383,0.00010971364,0.000002660777,0.00006499785,0.000032218395,0.000010179413,0.0006211008],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.97717106,0.0132024735,0.0012918235,0.0007956023,0.004425245,0.0031137357],"domain_scores_gemma":[0.9620515,0.024315713,0.0041957344,0.0010931827,0.0065168883,0.0018269859],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021317303,0.0005654878,0.0004060655,0.0035916138,0.003192964,0.008665448,0.0010769372,0.001553071,0.0026190819],"category_scores_gemma":[0.038371578,0.0004716653,0.0005248302,0.0036152918,0.0030016063,0.0048980694,0.0035283142,0.0013770235,0.00042216928],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019266145,0.0007251626,0.19664326,0.0036243752,0.00016042464,0.002203559,0.46052605,0.0017527619,0.004162877,0.04252594,0.0035500354,0.2839329],"study_design_scores_gemma":[0.00001363299,0.00021732428,0.07060724,0.0027482912,0.00012601694,0.0005698777,0.87346023,0.0021481647,0.0033387297,0.006196764,0.04049772,0.00007601632],"about_ca_topic_score_codex":0.0072009265,"about_ca_topic_score_gemma":0.010278153,"teacher_disagreement_score":0.021317303,"about_ca_system_score_codex":0.008307933,"about_ca_system_score_gemma":0.017024111,"threshold_uncertainty_score":0.11273801},"labels":[],"label_agreement":null},{"id":"W4392370325","doi":"10.18280/ijsse.140104","title":"Integrate Building Information Modeling (BIM) and Occupant Characteristics Simulator to Assess the Effectiveness of Emergency Requirements","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Building information modeling; Simulation; Engineering; Transport engineering; Operations management","score_opus":0.014298401225557884,"score_gpt":0.264075819770073,"score_spread":0.2497774185445151,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392370325","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8528336,0.00009225859,0.13914642,0.00009653599,0.00004287408,0.0001882899,0.0005614486,0.0010149814,0.006023513],"genre_scores_gemma":[0.95242935,0.00007200696,0.04626962,0.00001805483,0.0000028122554,0.00008133703,0.00037630848,0.000041661835,0.00070879003],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997397,0.00008976867,0.000016920263,0.000031005653,0.00009040149,0.00003218459],"domain_scores_gemma":[0.9996045,0.00019161393,0.00004226476,0.000053106207,0.00007067088,0.000037855294],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004976931,0.00060674764,0.00030188813,0.0006192063,0.0001894506,0.000467798,0.0005034555,0.0004323827,0.0012758297],"category_scores_gemma":[0.0012817652,0.0002366039,0.00044358385,0.00036585028,0.0001726206,0.0005389788,0.0007016012,0.00030977358,0.00019132711],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00046304587,0.0009650415,0.04328952,0.00018933359,0.00013614823,0.00021189677,0.00041028796,0.8560247,0.018844811,0.002693841,0.00095428206,0.07581701],"study_design_scores_gemma":[0.000016815313,0.00024652277,0.0064222775,0.000009326137,0.000030147748,0.000045273016,0.000103081846,0.9862714,0.005511618,0.00047975677,0.00084601383,0.00001784877],"about_ca_topic_score_codex":0.006175825,"about_ca_topic_score_gemma":0.0078270305,"teacher_disagreement_score":0.006175825,"about_ca_system_score_codex":0.00034828472,"about_ca_system_score_gemma":0.0007267524,"threshold_uncertainty_score":0.012279749},"labels":[],"label_agreement":null},{"id":"W4392400114","doi":"10.23977/jeis.2024.090107","title":"The Promotion of BIM Integrated Design in Building Engineering Construction","year":2024,"lang":"en","type":"article","venue":"Journal of Electronics and Information Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Promotion (chess); Construction engineering; Engineering; Architectural engineering; Political science","score_opus":0.005672506925393084,"score_gpt":0.20934018377241967,"score_spread":0.20366767684702658,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392400114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.006445583,0.000924962,0.9747868,0.0003701533,0.0001272584,0.00006125849,0.000030926803,0.00037002732,0.016882999],"genre_scores_gemma":[0.16360725,0.0015762029,0.82984453,0.00017517147,0.000092851515,0.00018254164,0.0001714274,0.0002023209,0.004147756],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9955343,0.0014113243,0.00014086247,0.00030506516,0.0024424447,0.00016598288],"domain_scores_gemma":[0.99869055,0.00032875652,0.00010851914,0.00037113437,0.00042755067,0.00007349561],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032510816,0.0010954911,0.0006166388,0.0021613005,0.0008432729,0.0022692075,0.0014107528,0.0011471043,0.0027078628],"category_scores_gemma":[0.0034987372,0.0006918461,0.00094795856,0.0017335387,0.0013860322,0.0034729622,0.0031492272,0.0015581672,0.0010687134],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114603536,0.00021026334,0.0027995654,0.0008144659,0.000080472644,0.0002532014,0.0014603051,0.084696084,0.03050637,0.33016664,0.0043881554,0.54450995],"study_design_scores_gemma":[0.000083977284,0.00057294604,0.0046879305,0.0006297384,0.00019267724,0.0017678773,0.00089021964,0.40655348,0.060001656,0.1590374,0.36539868,0.00018335383],"about_ca_topic_score_codex":0.0008556087,"about_ca_topic_score_gemma":0.00092082407,"teacher_disagreement_score":0.0032510816,"about_ca_system_score_codex":0.0009220783,"about_ca_system_score_gemma":0.0014668844,"threshold_uncertainty_score":0.017193556},"labels":[],"label_agreement":null},{"id":"W4392455782","doi":"10.1061/9780784485248.101","title":"Agile Project Planning Framework and Method for Allocating Limited Crews to Drainage Construction Projects","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Agile software development; Computer science; Drainage; Project management; Construction engineering; Engineering management; Systems engineering; Engineering; Software engineering","score_opus":0.026294119529623364,"score_gpt":0.31187372685180337,"score_spread":0.28557960732218,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392455782","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013468809,0.000067577384,0.99606687,0.00008508499,0.000011980365,0.00012749634,0.00003907731,0.0001221361,0.0021329955],"genre_scores_gemma":[0.031986568,0.00014981479,0.9656182,0.000018943323,0.0000067294573,0.00042444284,0.00007283295,0.000032876378,0.001689525],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.998231,0.00084808806,0.00009593943,0.00022681082,0.0004856304,0.00011263771],"domain_scores_gemma":[0.9991677,0.00038147147,0.00008681547,0.00009881033,0.00017660247,0.00008859244],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021473027,0.0007900304,0.000449381,0.00134344,0.00073304976,0.0015009214,0.0017467645,0.0006797875,0.004197651],"category_scores_gemma":[0.0020095818,0.000581926,0.0007365166,0.0016156666,0.0014255403,0.00082597265,0.001510095,0.0010467162,0.00069661625],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001127584,0.00017817429,0.0017011898,0.00046874315,0.00006028337,0.0006700306,0.0016507306,0.2670651,0.0068424474,0.40036517,0.006926888,0.3139586],"study_design_scores_gemma":[0.00013463509,0.00025434332,0.0006472791,0.00021561397,0.00004803855,0.0007784353,0.0010423627,0.79896194,0.004869394,0.10150816,0.091448806,0.00009099698],"about_ca_topic_score_codex":0.005272899,"about_ca_topic_score_gemma":0.008027949,"teacher_disagreement_score":0.005272899,"about_ca_system_score_codex":0.0011648856,"about_ca_system_score_gemma":0.003938294,"threshold_uncertainty_score":0.014042556},"labels":[],"label_agreement":null},{"id":"W4392456038","doi":"10.1061/9780784485231.029","title":"Expert Demonstration Collection of Long-Horizon Construction Tasks in Virtual Reality","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Virtual reality; Computer science; Human–computer interaction; Horizon; Mathematics","score_opus":0.01158095374483207,"score_gpt":0.23825916550267354,"score_spread":0.22667821175784147,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392456038","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.59551233,0.00021781061,0.39473507,0.00014153069,0.000053230742,0.0003118305,0.00039511148,0.004136172,0.004496858],"genre_scores_gemma":[0.8907238,0.00009995649,0.10640522,0.00004351834,0.0000084801195,0.00026002488,0.00056540704,0.00012658625,0.0017670202],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99919695,0.00031780006,0.000035494617,0.00015859657,0.0001796199,0.00011157481],"domain_scores_gemma":[0.9977939,0.0011272462,0.00018779816,0.00045425465,0.00021810243,0.0002186189],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013514857,0.0010126203,0.00068230944,0.0004381231,0.0003447352,0.0003982949,0.0013589057,0.00087132416,0.0029129288],"category_scores_gemma":[0.0035593282,0.00043435613,0.00043330013,0.00026784392,0.00052190485,0.0008451287,0.0015630763,0.0007539809,0.00056107674],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013045621,0.0018576884,0.0066827475,0.0008126661,0.00017268947,0.0016253152,0.0015683579,0.6313561,0.112303674,0.0029370585,0.004950422,0.23442867],"study_design_scores_gemma":[0.00012245223,0.0015584648,0.011256317,0.000060592414,0.000042075655,0.00035192765,0.00039991722,0.9395198,0.03831334,0.0020806124,0.0062158895,0.000078616074],"about_ca_topic_score_codex":0.0025410217,"about_ca_topic_score_gemma":0.0035808452,"teacher_disagreement_score":0.0029129288,"about_ca_system_score_codex":0.00034409016,"about_ca_system_score_gemma":0.0007858396,"threshold_uncertainty_score":0.009744763},"labels":[],"label_agreement":null},{"id":"W4392456081","doi":"10.1061/9780784485231.017","title":"Simulation-Based Approach for Master Planning and Scheduling in Offsite Construction Supply Chain Management","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Scheduling (production processes); Computer science; Supply chain management; Supply chain; Systems engineering; Operations management; Engineering; Business","score_opus":0.01586987261122653,"score_gpt":0.23001331381718054,"score_spread":0.21414344120595402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392456081","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026870081,0.00007045747,0.9685734,0.00006648005,0.000022404141,0.00009757286,0.00006848159,0.00067474146,0.0035563225],"genre_scores_gemma":[0.72529393,0.00020691827,0.27106738,0.000034149478,0.000018292518,0.00032424837,0.00021150807,0.00010774533,0.002735903],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995906,0.00017442944,0.000022087417,0.00006387746,0.00009831935,0.000050798524],"domain_scores_gemma":[0.9994972,0.000287534,0.000056364024,0.000044279546,0.000075886026,0.00003870759],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007299028,0.0005863332,0.00062682474,0.00071523554,0.0005697053,0.0009333289,0.0009992212,0.0007105664,0.0028721648],"category_scores_gemma":[0.0012178011,0.00050471275,0.00074379536,0.0005295431,0.0004899423,0.0007100932,0.0008804016,0.0006774505,0.0002895079],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002456729,0.000017877876,0.00035884744,0.000015331769,0.00001211482,0.000025695525,0.00005200023,0.98788154,0.0008752081,0.0031507567,0.00010474725,0.0074812598],"study_design_scores_gemma":[0.000003095864,0.0000071276654,0.00003654831,0.000002087535,0.0000025225281,0.0000029989837,0.0000072454077,0.9987424,0.00021834079,0.00063806854,0.00033780522,0.0000018588713],"about_ca_topic_score_codex":0.014193206,"about_ca_topic_score_gemma":0.013556174,"teacher_disagreement_score":0.014193206,"about_ca_system_score_codex":0.0010523144,"about_ca_system_score_gemma":0.0019805555,"threshold_uncertainty_score":0.02822119},"labels":[],"label_agreement":null},{"id":"W4392578434","doi":"10.1016/j.jobe.2024.109022","title":"BIM-based automated fault detection and diagnostics of HVAC systems in commercial buildings","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":27,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Building information modeling; HVAC; Facility management; Analytics; Systems engineering; Computer science; Reuse; Information model; Engineering; Software engineering; Data science","score_opus":0.005377088752462981,"score_gpt":0.21211051348323856,"score_spread":0.20673342473077558,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392578434","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24686493,0.00035447994,0.73638177,0.00030862787,0.00006053348,0.00021660783,0.0009779575,0.005721388,0.009113709],"genre_scores_gemma":[0.8818121,0.00016391043,0.116341576,0.000031373318,0.000008041229,0.00006351096,0.00074537785,0.000060057726,0.0007741344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99939895,0.000144956,0.000036102123,0.00007714731,0.00028024073,0.0000626689],"domain_scores_gemma":[0.9994043,0.00014515915,0.00008152,0.000117094285,0.00021360531,0.00003832399],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00070273574,0.000581444,0.00053011073,0.0023510712,0.00043579465,0.0011331636,0.00071864383,0.0005815529,0.0016188872],"category_scores_gemma":[0.0024114628,0.00034354886,0.00047848493,0.0013553178,0.0004243224,0.0013159649,0.0013349678,0.0003886894,0.000557112],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028659188,0.00028162016,0.0144122755,0.00018910106,0.00006050232,0.0002876665,0.00051045744,0.62462723,0.0132347485,0.006535931,0.0030598808,0.33651397],"study_design_scores_gemma":[0.00000732375,0.000032193842,0.0035934874,0.000016679136,0.000009130153,0.00004966395,0.00014683402,0.987038,0.005563022,0.0020450954,0.0014865918,0.000012024179],"about_ca_topic_score_codex":0.008521192,"about_ca_topic_score_gemma":0.01005937,"teacher_disagreement_score":0.008521192,"about_ca_system_score_codex":0.0009785034,"about_ca_system_score_gemma":0.0010781843,"threshold_uncertainty_score":0.016943216},"labels":[],"label_agreement":null},{"id":"W4392665696","doi":"10.14359/51740669","title":"SP-361: Concrete and Cement-Based Composites for Sustainable Built Environments","year":2024,"lang":"en","type":"paratext","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cement; Composite material; Materials science","score_opus":0.007510183215591169,"score_gpt":0.21546655996875275,"score_spread":0.2079563767531616,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392665696","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.080180354,0.009614181,0.119136535,0.0021369155,0.0017793251,0.0011611484,0.015333805,0.010426594,0.76023114],"genre_scores_gemma":[0.27480984,0.008083533,0.09405809,0.0002871028,0.00020553506,0.0005470465,0.012240558,0.0016831139,0.6080852],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994568,0.000044817727,0.00001638485,0.000058684236,0.00038182322,0.000041406634],"domain_scores_gemma":[0.99967766,0.000034636407,0.000023470655,0.000037609374,0.00018174297,0.000044881697],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000792459,0.00080913847,0.0002842566,0.0014740006,0.00067281595,0.0010129571,0.00073603704,0.000949654,0.042853937],"category_scores_gemma":[0.00054265023,0.00030659483,0.00042645028,0.001243326,0.0003306394,0.0009412828,0.0011112865,0.00059879944,0.017164527],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045168112,0.00025031573,0.0015775732,0.0014999672,0.000025866388,0.00035569663,0.00030145736,0.015171309,0.102421835,0.018993387,0.13149871,0.72745216],"study_design_scores_gemma":[0.000057624282,0.000412222,0.0069564455,0.0003369962,0.000028795346,0.00058348675,0.00026836435,0.009355129,0.06726707,0.006569068,0.90811235,0.000052347405],"about_ca_topic_score_codex":0.005800882,"about_ca_topic_score_gemma":0.011623962,"teacher_disagreement_score":0.042853937,"about_ca_system_score_codex":0.00076767855,"about_ca_system_score_gemma":0.0011165199,"threshold_uncertainty_score":0.14336067},"labels":[],"label_agreement":null},{"id":"W4392734748","doi":"10.1108/sasbe-12-2023-0379","title":"An advanced exploration of functionalities as the underlying principles of construction control metrics","year":2024,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Keele University; Agence Nationale de la Recherche","keywords":"Computer science; Control (management); Workflow; Context (archaeology); Process management; Lagging; Quality (philosophy); Process (computing); Sensemaking; Project management; Engineering management; Systems engineering; Knowledge management; Engineering; Artificial intelligence","score_opus":0.01809620566078199,"score_gpt":0.2246221243085475,"score_spread":0.2065259186477655,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392734748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20299022,0.003246201,0.73953235,0.003699019,0.0001328425,0.00052646914,0.00068776583,0.00061961386,0.04856547],"genre_scores_gemma":[0.8042678,0.0007893803,0.19259664,0.00012394175,0.000043634293,0.0002760959,0.00029438265,0.0001067538,0.0015013759],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99397016,0.002902232,0.0005217742,0.00070689654,0.001683198,0.00021576835],"domain_scores_gemma":[0.98076826,0.011600219,0.002675835,0.0015607843,0.00291537,0.00047957513],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0070927376,0.0014649957,0.0004942884,0.008784555,0.0010225265,0.0055726143,0.0010521575,0.0008056444,0.0028386319],"category_scores_gemma":[0.018516952,0.000454969,0.001022849,0.0055264914,0.0044839657,0.009123973,0.0022108457,0.0013402732,0.0002866895],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015608463,0.00016153442,0.03922092,0.0015401931,0.00017019214,0.00040932276,0.017030748,0.010838219,0.011026784,0.6591787,0.002213997,0.25805333],"study_design_scores_gemma":[0.000030681014,0.00067462516,0.081769116,0.0026484267,0.00025556237,0.0017394422,0.022652509,0.15272877,0.008703195,0.64452654,0.08396521,0.00030597023],"about_ca_topic_score_codex":0.0023689284,"about_ca_topic_score_gemma":0.0018007862,"teacher_disagreement_score":0.008784555,"about_ca_system_score_codex":0.0021459647,"about_ca_system_score_gemma":0.0018769,"threshold_uncertainty_score":0.037510455},"labels":[],"label_agreement":null},{"id":"W4392775857","doi":"10.1007/978-981-97-1514-5","title":"Proceedings of the 2nd International Conference on Advanced Civil Engineering and Smart Structures","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Mahasarakham University; Trakya Üniversitesi; Shandong Jianzhu University; Bauhaus-Universität Weimar; Beijing Technology and Business University; Universidade Federal do Rio Grande do Sul; Shandong University; Atatürk Üniversitesi; Universidad de Cádiz; Universiti Teknologi Malaysia; Zhejiang University; Iowa State University; King Mongkut's University of Technology Thonburi; University of Thessaly; Zhengzhou University; Università di Catania; Central South University; Saint Petersburg State University; Politechnika Bialostocka; Beijing University of Technology; Université de Sherbrooke; Central Queensland University; Đại học Đà Nẵng; Education University of Hong Kong; Wojskowa Akademia Techniczna; Politecnico di Torino; Università Degli Studi di Modena e Reggio Emila; University of Canterbury; City University of Hong Kong; Indian National Science Academy; Universitatea Tehnică „Gheorghe Asachi” din Iaşi; Auckland University of Technology, New Zealand","keywords":"Engineering; Engineering ethics; Political science; Engineering management; Library science; Computer science","score_opus":0.005953892740402382,"score_gpt":0.19366350843693622,"score_spread":0.18770961569653383,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392775857","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014332536,0.041856524,0.101223096,0.004323851,0.055156708,0.00022427809,0.0008955241,0.0013726074,0.78061473],"genre_scores_gemma":[0.020221073,0.013034129,0.016841257,0.0003867164,0.0022955858,0.0000704138,0.0013319874,0.0004447845,0.94537413],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994929,0.000075641336,0.000015877044,0.00006730747,0.0002802965,0.00006810958],"domain_scores_gemma":[0.99953544,0.000060520317,0.0000133410085,0.000060478083,0.00021169447,0.00011844761],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0007435261,0.00091750576,0.0011113537,0.0008708096,0.00060394075,0.0027221008,0.0010189435,0.0009615284,0.08615362],"category_scores_gemma":[0.00055469293,0.000304543,0.0007352445,0.0009637705,0.0005473582,0.0012378708,0.0013420761,0.0012785809,0.035859685],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002945917,0.00032165775,0.00059770455,0.0003334881,0.000046893234,0.00021707438,0.00018947112,0.0025825195,0.009987955,0.014927033,0.56175697,0.40874466],"study_design_scores_gemma":[0.000014500899,0.00009473953,0.0015255287,0.00013470455,0.00002856776,0.00023558964,0.000120112214,0.00422607,0.0033489645,0.004615579,0.98563725,0.00001838085],"about_ca_topic_score_codex":0.0028154282,"about_ca_topic_score_gemma":0.0074664894,"teacher_disagreement_score":0.9138464,"about_ca_system_score_codex":0.00056650816,"about_ca_system_score_gemma":0.001374366,"threshold_uncertainty_score":0.2882126},"labels":[],"label_agreement":null},{"id":"W4392869766","doi":"10.2139/ssrn.4760275","title":"Multi-Objective Optimization of Cement-Based Systems Containing Marine Dredged Sediment","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Cement; Sediment; Environmental science; Geotechnical engineering; Geology; Geomorphology; Materials science; Composite material","score_opus":0.008002816271353439,"score_gpt":0.21987576973649298,"score_spread":0.21187295346513954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392869766","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5603081,0.0013597518,0.4157171,0.0006529673,0.0001448422,0.00020093464,0.00070297637,0.00042618546,0.020487182],"genre_scores_gemma":[0.9839931,0.00020964158,0.0120558,0.000032187407,0.000013158059,0.00008574276,0.00013768746,0.000044163284,0.0034286524],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960345,0.00012560381,0.000019575173,0.00006407101,0.0000850499,0.00010225648],"domain_scores_gemma":[0.99923134,0.00046044303,0.00008894248,0.00003146386,0.00011704454,0.00007066168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011071576,0.0014893068,0.0019816114,0.00097634626,0.0007867137,0.0024006858,0.0011162929,0.0026027719,0.0026875995],"category_scores_gemma":[0.001723476,0.00096415845,0.0011214137,0.0010869519,0.00088856794,0.00086692756,0.0013008434,0.0010566054,0.00026466546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014113293,0.000008961703,0.00008700899,0.000011811592,0.0000065175027,0.000015993708,0.000003640248,0.99867034,0.00022041479,0.00015678162,0.00003021499,0.0007741804],"study_design_scores_gemma":[0.0000050745075,0.000026279555,0.0001282656,0.0000029075543,0.0000061485453,0.0000032102735,0.000008008377,0.9994216,0.00018935197,0.0001467097,0.000059905695,0.0000026058324],"about_ca_topic_score_codex":0.021711066,"about_ca_topic_score_gemma":0.013428464,"teacher_disagreement_score":0.021711066,"about_ca_system_score_codex":0.0016203969,"about_ca_system_score_gemma":0.0015757896,"threshold_uncertainty_score":0.04316938},"labels":[],"label_agreement":null},{"id":"W4392896973","doi":"10.1061/9780784485286.055","title":"Short-Term Planning of Municipal Infrastructure Maintenance Operations: Problem Statement and Optimization Formulation","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Scheduling (production processes); Computer science; Term (time); Operations research; Problem statement; Frame (networking); Job shop scheduling; Operations management; Management science; Schedule; Engineering","score_opus":0.010102853698857165,"score_gpt":0.24392913627790902,"score_spread":0.23382628257905186,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392896973","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.063222624,0.001282744,0.90583146,0.0017281746,0.000098417026,0.00051738846,0.0010017854,0.00037412948,0.02594328],"genre_scores_gemma":[0.75107485,0.0013554685,0.23281685,0.00024188659,0.00008175777,0.0012956947,0.00083021866,0.0001278206,0.012175403],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991321,0.00037119916,0.00003539611,0.00014839423,0.00017610172,0.00013675776],"domain_scores_gemma":[0.9984492,0.0010593266,0.00017397474,0.000041781503,0.00019899239,0.000076640375],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020133972,0.0009934476,0.0012770942,0.0007218523,0.00063028757,0.0024453006,0.001582978,0.002676816,0.005808295],"category_scores_gemma":[0.0032604001,0.00087211234,0.00087309437,0.0013609818,0.00089603773,0.0012646315,0.0012990785,0.0014747446,0.0006229485],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016410006,0.00002412692,0.00021761558,0.00007599888,0.000007693035,0.000059643273,0.000027016284,0.99189526,0.00018824979,0.0024413767,0.00038551606,0.004661025],"study_design_scores_gemma":[0.000007859093,0.000026683823,0.00018723305,0.000016528278,0.00000870989,0.000016975899,0.000060566825,0.9973858,0.00016478394,0.0013884744,0.00073040434,0.000005910382],"about_ca_topic_score_codex":0.019472962,"about_ca_topic_score_gemma":0.015502345,"teacher_disagreement_score":0.019472962,"about_ca_system_score_codex":0.0020373922,"about_ca_system_score_gemma":0.0038506433,"threshold_uncertainty_score":0.038719237},"labels":[],"label_agreement":null},{"id":"W4392897016","doi":"10.1061/9780784485286.011","title":"Results of a Groundbreaking Integrated Delivery Project: Multi-Stakeholder Assessments and Lessons Learned from the Waaban Crossing Bridge","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Kingston Health Sciences Centre","funders":"","keywords":"Project sponsorship; Project stakeholder; Integrated project delivery; Project team; Stakeholder; Bridge (graph theory); Project charter; Transparency (behavior); Business; Project management triangle; Project management; Stakeholder engagement; Project planning; Basis of estimate; Project manager; Process management; Public relations; Knowledge management; Engineering; Computer science; Political science; Computer security; Medicine","score_opus":0.15134616525734423,"score_gpt":0.33580129356703375,"score_spread":0.18445512830968952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392897016","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9844046,0.000080247264,0.0034853786,0.0009996877,0.0000090947115,0.0004059594,0.0001551577,0.00003075874,0.010428984],"genre_scores_gemma":[0.9918936,0.0001622224,0.0047717793,0.00016787046,0.0000051438806,0.00023881081,0.00016703717,0.000037589725,0.0025559478],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.97973514,0.012284763,0.00077327515,0.00096718967,0.004707507,0.001532149],"domain_scores_gemma":[0.9684599,0.016817717,0.0014890997,0.0011985336,0.010448713,0.0015859798],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026698638,0.00071641227,0.0005773027,0.0019120532,0.0045240643,0.0033115554,0.001448023,0.0016517305,0.0020816382],"category_scores_gemma":[0.030712547,0.00056563003,0.0003839773,0.0016008028,0.003621381,0.0028784699,0.0050641843,0.0016401558,0.00038580847],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041299913,0.0011270377,0.037705157,0.0008435175,0.000053192598,0.0035084374,0.82311404,0.0035273794,0.0061372616,0.0030071265,0.004909042,0.11565477],"study_design_scores_gemma":[0.0000367102,0.0010846063,0.062037393,0.0005235458,0.000049059257,0.0005273019,0.90767354,0.003347667,0.0034497357,0.0025845128,0.018581029,0.00010482605],"about_ca_topic_score_codex":0.023089161,"about_ca_topic_score_gemma":0.06219842,"teacher_disagreement_score":0.026698638,"about_ca_system_score_codex":0.0068315477,"about_ca_system_score_gemma":0.0062105525,"threshold_uncertainty_score":0.14119756},"labels":[],"label_agreement":null},{"id":"W4392919890","doi":"10.1061/9780784485262.122","title":"Prioritizing and Work Packaging of Multi-Facility Rehabilitation Using Text Mining","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Work (physics); Computer science; Engineering; Mechanical engineering","score_opus":0.016353685715238743,"score_gpt":0.24260724700156341,"score_spread":0.22625356128632468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392919890","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35656878,0.0009782391,0.5975661,0.0010856406,0.00017292547,0.0022096625,0.01882225,0.011768361,0.01082796],"genre_scores_gemma":[0.49104625,0.00040151452,0.48227674,0.00013850837,0.000056076235,0.0006613646,0.02050989,0.00037667432,0.0045329886],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9973226,0.00053933566,0.00040284498,0.0007116067,0.0008702489,0.00015342345],"domain_scores_gemma":[0.99562126,0.0018704009,0.0006887681,0.00047499238,0.0012252101,0.000119404016],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018122274,0.0012650621,0.0008558583,0.0063549383,0.000715274,0.00214395,0.0014971131,0.0009269922,0.0022522458],"category_scores_gemma":[0.0056275376,0.00040121304,0.001054256,0.0038607733,0.00030985393,0.0017905139,0.0009621213,0.0005765205,0.0019389127],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006740711,0.0010769545,0.05153448,0.0012816538,0.00016037372,0.0016584075,0.0013316545,0.033211462,0.04190723,0.0021761698,0.012941134,0.8520465],"study_design_scores_gemma":[0.00009458293,0.0008975982,0.0975362,0.0005600998,0.00034607627,0.0016040143,0.005306687,0.70623773,0.12699406,0.013415536,0.04681271,0.00019464562],"about_ca_topic_score_codex":0.0042839507,"about_ca_topic_score_gemma":0.007020746,"teacher_disagreement_score":0.0063549383,"about_ca_system_score_codex":0.00082020555,"about_ca_system_score_gemma":0.0013723545,"threshold_uncertainty_score":0.009584129},"labels":[],"label_agreement":null},{"id":"W4392941266","doi":"10.1109/apscon60364.2024.10465871","title":"ConstructNet: A Deep Learning Object Detector for Construction Site Surveillance","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Detector; Artificial intelligence; Object detection; Object (grammar); Deep learning; Computer vision; Pattern recognition (psychology); Telecommunications","score_opus":0.005016710404377465,"score_gpt":0.20131197939547835,"score_spread":0.1962952689911009,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4392941266","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20993051,0.0057718316,0.63918835,0.0018122393,0.0013384769,0.0008729526,0.034365393,0.08000636,0.02671392],"genre_scores_gemma":[0.49043912,0.002200061,0.3739477,0.00090822,0.00017419738,0.00062373676,0.1024903,0.0011456957,0.028070902],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99957114,0.00003914055,0.000018428324,0.00015328224,0.00014180709,0.000076156924],"domain_scores_gemma":[0.99971896,0.00005677894,0.000029878738,0.00006725173,0.00009539801,0.000031762866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006419485,0.0021895284,0.00086272944,0.0018579448,0.0005730456,0.0010213869,0.002526827,0.0013735056,0.003593647],"category_scores_gemma":[0.0012775492,0.00065738166,0.0008730432,0.0017115299,0.0006050731,0.0017205226,0.0015643612,0.0015535052,0.0023799401],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079400575,0.0006375797,0.009466151,0.00050929625,0.00036934152,0.0004117396,0.00009732176,0.14453202,0.014034432,0.0070848647,0.16978335,0.6522799],"study_design_scores_gemma":[0.00006227291,0.00019631788,0.002931793,0.0000666097,0.000083787454,0.00024116674,0.00005913631,0.9418143,0.017492304,0.0051804967,0.03183123,0.0000406002],"about_ca_topic_score_codex":0.027459433,"about_ca_topic_score_gemma":0.048702314,"teacher_disagreement_score":0.027459433,"about_ca_system_score_codex":0.0017430475,"about_ca_system_score_gemma":0.0020001344,"threshold_uncertainty_score":0.054599226},"labels":[],"label_agreement":null},{"id":"W4393144079","doi":"10.1007/978-3-031-47504-7_14","title":"Robust Cuts in Bricks","year":2024,"lang":"en","type":"book-chapter","venue":"Algorithms and computation in mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Computer science","score_opus":0.020292482528453032,"score_gpt":0.22150656287556925,"score_spread":0.20121408034711621,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393144079","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003726887,0.0029505999,0.9037555,0.00042841383,0.00033302692,0.000037925638,0.0001415359,0.0004068957,0.08821912],"genre_scores_gemma":[0.21600294,0.0058917073,0.5613809,0.0005628317,0.00062663504,0.00024946438,0.00089415134,0.0018903081,0.212501],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99916065,0.00018393048,0.000031523385,0.00019476107,0.00037738646,0.000051729632],"domain_scores_gemma":[0.99926406,0.00035059318,0.00006588531,0.000163136,0.00012216737,0.000034158526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008572797,0.0011327859,0.0012735127,0.00149286,0.0007475202,0.002823629,0.0015294382,0.0016645581,0.016150516],"category_scores_gemma":[0.0031905004,0.0011236998,0.0008236176,0.0015368521,0.0028616851,0.0034577977,0.0022705498,0.0038023444,0.0041267443],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025101379,0.000010707572,0.000035054913,0.00010996713,0.000012715786,0.000020051517,0.00006534796,0.024326488,0.0012615996,0.91565824,0.006921519,0.051553156],"study_design_scores_gemma":[0.00000770489,0.000020723048,0.000107831,0.00005974926,0.000010184286,0.00004913116,0.000042704825,0.052952833,0.0011622981,0.90364844,0.04192385,0.0000146100765],"about_ca_topic_score_codex":0.0015472458,"about_ca_topic_score_gemma":0.0014567849,"teacher_disagreement_score":0.016150516,"about_ca_system_score_codex":0.0012643503,"about_ca_system_score_gemma":0.0004898083,"threshold_uncertainty_score":0.05402881},"labels":[],"label_agreement":null},{"id":"W4393195174","doi":"10.1007/s44290-024-00002-0","title":"Unveiling a new horizon in civil engineering","year":2024,"lang":"en","type":"article","venue":"Discover Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Horizon; Mathematical economics; Economics; Mathematics; Geometry","score_opus":0.005152618983079885,"score_gpt":0.1863034706965655,"score_spread":0.1811508517134856,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393195174","genre_codex":"commentary","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010419057,0.24810581,0.038869496,0.5212006,0.05123647,0.000038788963,0.00013983661,0.00066614355,0.12932387],"genre_scores_gemma":[0.30233517,0.3545547,0.07933485,0.09772485,0.078303404,0.00015716853,0.00041189842,0.0011792543,0.08599869],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943452,0.001960805,0.00022704114,0.0003730887,0.0025285105,0.0005655121],"domain_scores_gemma":[0.982518,0.009254952,0.00065756676,0.0012263396,0.0028890502,0.0034541432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009144131,0.00058273034,0.0008043821,0.0027182049,0.004951605,0.014549471,0.0014577799,0.006509402,0.01503212],"category_scores_gemma":[0.013310773,0.00034683588,0.0005895767,0.0030348415,0.015445364,0.024240104,0.0071330126,0.008824487,0.0037419028],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000039364644,0.00011906733,0.00054106495,0.0009883157,0.000012928895,0.00021239238,0.0038879567,0.0006821907,0.0011772389,0.6023254,0.18459299,0.20542108],"study_design_scores_gemma":[0.000004053148,0.000033848155,0.00023233799,0.00064878486,0.00000422557,0.00017158984,0.002607602,0.00043162203,0.00035684544,0.21752764,0.7779582,0.000023327859],"about_ca_topic_score_codex":0.0010708036,"about_ca_topic_score_gemma":0.003401471,"teacher_disagreement_score":0.01503212,"about_ca_system_score_codex":0.0029631008,"about_ca_system_score_gemma":0.009385397,"threshold_uncertainty_score":0.050287426},"labels":[],"label_agreement":null},{"id":"W4393217421","doi":"10.3390/buildings14040918","title":"The Assessment of the Maturity of Informatization in Assembly-Building Projects Utilizing the CMM-CME Methodology, Taking a Project in China as an Illustration","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Informatization; China; Maturity (psychological); Engineering; Engineering management; Manufacturing engineering; Capability Maturity Model; Construction engineering; Systems engineering; Architectural engineering; Computer science; Political science; Telecommunications","score_opus":0.04127413801616046,"score_gpt":0.33437739654728793,"score_spread":0.29310325853112745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393217421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.89944535,0.00056723296,0.070998535,0.0005829611,0.000019071593,0.0013477398,0.0002459121,0.000066800814,0.026726328],"genre_scores_gemma":[0.9522632,0.00037065675,0.045361288,0.000022690043,0.0000032090852,0.0006279205,0.00016115964,0.0000043603454,0.0011856412],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9950311,0.0023563637,0.00060601067,0.0003045985,0.0013022785,0.00039956594],"domain_scores_gemma":[0.9898442,0.004512965,0.0015316946,0.00038943262,0.0032564886,0.00046506658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010894936,0.0006029972,0.00030330548,0.008071606,0.0012807656,0.0020638127,0.0005673933,0.0006309253,0.0010403789],"category_scores_gemma":[0.014425464,0.0003163229,0.00059147127,0.006080654,0.0011194737,0.0030603483,0.0023194256,0.00061084697,0.000085053856],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022160426,0.00042667822,0.38871792,0.0020674353,0.000107855645,0.00087413203,0.054620717,0.016661573,0.010200146,0.05305038,0.0015031785,0.47154838],"study_design_scores_gemma":[0.000071900606,0.0013491557,0.7062111,0.0016807351,0.00019397914,0.0007346209,0.13659327,0.09908752,0.015879745,0.016088756,0.021876728,0.00023245995],"about_ca_topic_score_codex":0.011713802,"about_ca_topic_score_gemma":0.015857277,"teacher_disagreement_score":0.011713802,"about_ca_system_score_codex":0.0070065917,"about_ca_system_score_gemma":0.008357292,"threshold_uncertainty_score":0.057618618},"labels":[],"label_agreement":null},{"id":"W4393220625","doi":"10.1016/j.autcon.2024.105389","title":"Vision-based real-time process monitoring and problem feedback for productivity-oriented analysis in off-site construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":23,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; China Postdoctoral Science Foundation","keywords":"Productivity; Process (computing); Computer science; Engineering; Industrial engineering; Real-time computing; Economics; Operating system","score_opus":0.004545355074329525,"score_gpt":0.2406561567034245,"score_spread":0.23611080162909498,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393220625","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25240645,0.00029400148,0.73944235,0.00011797437,0.00007225803,0.000098956225,0.00015113332,0.003888759,0.003528087],"genre_scores_gemma":[0.89757675,0.00008506079,0.10115728,0.000035897192,0.00001266959,0.000046344234,0.00014241606,0.000088618006,0.0008549304],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947745,0.00009504935,0.00001965274,0.00012479331,0.00020714272,0.000075910946],"domain_scores_gemma":[0.99933594,0.00019878734,0.00009510036,0.00007277238,0.00021616038,0.00008133597],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005579237,0.000573478,0.0007953365,0.0014779634,0.0002456581,0.00087136234,0.00085472455,0.00068839383,0.0018489038],"category_scores_gemma":[0.0014747258,0.00032388547,0.00037570836,0.0006780742,0.00030918288,0.0007745292,0.0009599677,0.0005739311,0.00043145093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011917551,0.0011458187,0.0063539236,0.00026067274,0.000079738595,0.00016937777,0.00037371676,0.08311334,0.17536889,0.0012442895,0.0033499945,0.7273485],"study_design_scores_gemma":[0.00002719354,0.00018933717,0.0071027987,0.000009623701,0.000021066071,0.000072944975,0.00009377912,0.9670029,0.024044957,0.00079126103,0.00062256586,0.00002163184],"about_ca_topic_score_codex":0.0031937214,"about_ca_topic_score_gemma":0.0039199255,"teacher_disagreement_score":0.0031937214,"about_ca_system_score_codex":0.00040629198,"about_ca_system_score_gemma":0.00074083346,"threshold_uncertainty_score":0.006350279},"labels":[],"label_agreement":null},{"id":"W4393373757","doi":"10.46299/isg.2024.1.13","title":"Proceedings of the XIII International Scientific and Practical Conference","year":2024,"lang":"en","type":"paratext","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Baki Dövlət Universiteti; Xidian University; Sumy State University; Kungliga Tekniska Högskolan; University of Miami; York University; Ohio State University; Lviv Polytechnic National University; Arizona State University; DePaul University; Southern Methodist University; Tianjin University; Carnegie Mellon University; Northwestern University; University of Southern California","keywords":"Computer science; Library science; Engineering ethics; Engineering","score_opus":0.017564915033718136,"score_gpt":0.25622394013054967,"score_spread":0.23865902509683154,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393373757","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002009552,0.010661238,0.005932508,0.009991404,0.04960092,0.00014978345,0.0009901266,0.0006063127,0.92005813],"genre_scores_gemma":[0.0045896624,0.0033916554,0.001892189,0.00040792036,0.0023297295,0.00006436814,0.0011556839,0.00019302184,0.9859759],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99897516,0.00018442392,0.000048429185,0.00013740518,0.0005298945,0.00012461575],"domain_scores_gemma":[0.9986823,0.00010839021,0.000034808316,0.00015681342,0.00068339566,0.00033435953],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0016362243,0.00094922207,0.0005870448,0.0015374392,0.0014452526,0.00643469,0.0011805097,0.0015113436,0.3666117],"category_scores_gemma":[0.0018964163,0.00021987624,0.0005484288,0.0015995039,0.000692413,0.0023094106,0.002632837,0.0017087839,0.20245746],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000074137075,0.00006860882,0.0001815388,0.00017994903,0.000007027037,0.00010517356,0.000118678894,0.00023614566,0.00084707583,0.007857239,0.87862325,0.111701205],"study_design_scores_gemma":[0.0000026385217,0.00001093374,0.00014141115,0.000049553426,0.0000017967621,0.000033700137,0.000058025944,0.00009604479,0.00013593907,0.000556569,0.9989109,0.000002474009],"about_ca_topic_score_codex":0.0023599593,"about_ca_topic_score_gemma":0.004454028,"teacher_disagreement_score":0.6333883,"about_ca_system_score_codex":0.0018131565,"about_ca_system_score_gemma":0.0025958281,"threshold_uncertainty_score":0.90345156},"labels":[],"label_agreement":null},{"id":"W4393446281","doi":"10.5281/zenodo.4742845","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393446281","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034711196,0.00033953076,0.030935701,0.00078744086,0.00021081883,0.0008859111,0.9299632,0.008294851,0.025111444],"genre_scores_gemma":[0.009928906,0.0004457564,0.07022657,0.00025508978,0.000046846675,0.0014280237,0.90864307,0.0010461608,0.00797958],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99707687,0.0003446625,0.0007623473,0.00049025397,0.0011110997,0.00021479976],"domain_scores_gemma":[0.98979026,0.0014057495,0.0008410464,0.0027559288,0.004442826,0.0007640988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029069022,0.0007381218,0.0010195854,0.008231574,0.0012581934,0.003633481,0.0027215313,0.0013414781,0.044899315],"category_scores_gemma":[0.010806245,0.0006667201,0.0012641348,0.014887295,0.00038637267,0.0054587284,0.0029125009,0.0019955568,0.030614028],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018900775,0.00014425677,0.0104836505,0.0010881562,0.0000635002,0.0001534481,0.00083881395,0.0016517016,0.0019535753,0.016651979,0.8390946,0.12768729],"study_design_scores_gemma":[0.00002610555,0.000017878356,0.012323842,0.00022131324,0.000022050477,0.000078631696,0.00055891793,0.0019579378,0.0009900011,0.004243125,0.979508,0.000052141368],"about_ca_topic_score_codex":0.0687276,"about_ca_topic_score_gemma":0.090087146,"teacher_disagreement_score":0.0687276,"about_ca_system_score_codex":0.0042837025,"about_ca_system_score_gemma":0.007737712,"threshold_uncertainty_score":0.15020317},"labels":[],"label_agreement":null},{"id":"W4393496068","doi":"10.5281/zenodo.5589803","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Construction engineering; Data science; Engineering","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393496068","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033659895,0.00032887032,0.028626291,0.00075254263,0.00020222427,0.0008423883,0.9346206,0.007826392,0.023434615],"genre_scores_gemma":[0.009557596,0.00042983555,0.065661475,0.0002451681,0.00004505478,0.0013911673,0.91427267,0.0009835066,0.0074136034],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970752,0.00034527053,0.0007651064,0.00049457507,0.0011038905,0.00021605179],"domain_scores_gemma":[0.98983765,0.0014038995,0.000846177,0.0027466356,0.0043998566,0.0007657443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028791819,0.0007408148,0.0010148745,0.008211277,0.0012466505,0.0035931228,0.0027002657,0.0013373406,0.044022687],"category_scores_gemma":[0.01083736,0.00066248997,0.0012639903,0.014820295,0.00038380807,0.005404803,0.0029183421,0.0019963288,0.030507905],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018869102,0.00014266692,0.010623542,0.0011007892,0.00006397208,0.00015135299,0.00082499656,0.0016353052,0.0019224855,0.016196499,0.8426201,0.124529704],"study_design_scores_gemma":[0.000026338093,0.000018010109,0.012723948,0.00022571831,0.000022188968,0.00007802379,0.0005640836,0.0019434148,0.0009813227,0.0042255563,0.97913915,0.000052219748],"about_ca_topic_score_codex":0.06823888,"about_ca_topic_score_gemma":0.089762546,"teacher_disagreement_score":0.06823888,"about_ca_system_score_codex":0.004247813,"about_ca_system_score_gemma":0.0076350817,"threshold_uncertainty_score":0.14727056},"labels":[],"label_agreement":null},{"id":"W4393609568","doi":"10.5281/zenodo.6048353","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393609568","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033659895,0.00032887032,0.028626291,0.00075254263,0.00020222427,0.0008423883,0.9346206,0.007826392,0.023434615],"genre_scores_gemma":[0.009557596,0.00042983555,0.065661475,0.0002451681,0.00004505478,0.0013911673,0.91427267,0.0009835066,0.0074136034],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970752,0.00034527053,0.0007651064,0.00049457507,0.0011038905,0.00021605179],"domain_scores_gemma":[0.98983765,0.0014038995,0.000846177,0.0027466356,0.0043998566,0.0007657443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028791819,0.0007408148,0.0010148745,0.008211277,0.0012466505,0.0035931228,0.0027002657,0.0013373406,0.044022687],"category_scores_gemma":[0.01083736,0.00066248997,0.0012639903,0.014820295,0.00038380807,0.005404803,0.0029183421,0.0019963288,0.030507905],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018869102,0.00014266692,0.010623542,0.0011007892,0.00006397208,0.00015135299,0.00082499656,0.0016353052,0.0019224855,0.016196499,0.8426201,0.124529704],"study_design_scores_gemma":[0.000026338093,0.000018010109,0.012723948,0.00022571831,0.000022188968,0.00007802379,0.0005640836,0.0019434148,0.0009813227,0.0042255563,0.97913915,0.000052219748],"about_ca_topic_score_codex":0.06823888,"about_ca_topic_score_gemma":0.089762546,"teacher_disagreement_score":0.06823888,"about_ca_system_score_codex":0.004247813,"about_ca_system_score_gemma":0.0076350817,"threshold_uncertainty_score":0.14727056},"labels":[],"label_agreement":null},{"id":"W4393640286","doi":"10.5281/zenodo.6110275","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Construction engineering; Data science; Engineering","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393640286","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034429813,0.00034804514,0.03379301,0.00090128375,0.00022470774,0.0008856312,0.92174697,0.009323956,0.02933346],"genre_scores_gemma":[0.0100909155,0.0004416377,0.07021961,0.00027450337,0.000049181494,0.0013183528,0.9074203,0.001159291,0.009026253],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970733,0.0003404883,0.0007619157,0.00047119785,0.0011399238,0.00021321503],"domain_scores_gemma":[0.9899962,0.0013285382,0.00084348436,0.0026927313,0.004412744,0.00072629796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028592206,0.0007327575,0.0009616797,0.0079225,0.0012131204,0.0036937548,0.0028055776,0.0013149751,0.045460843],"category_scores_gemma":[0.010579679,0.0006394757,0.0012003416,0.014940726,0.0003979336,0.005405239,0.0028959326,0.0019368773,0.030386152],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015944423,0.00011973729,0.009286177,0.0009868247,0.000056346966,0.0001470847,0.00079731666,0.0015993158,0.0018131082,0.016794808,0.8452627,0.12297719],"study_design_scores_gemma":[0.000021866548,0.000015310172,0.011041916,0.00020266914,0.000018791037,0.000073458345,0.0005014134,0.0018405624,0.00093926926,0.0040185326,0.98127866,0.00004758548],"about_ca_topic_score_codex":0.07409391,"about_ca_topic_score_gemma":0.099029474,"teacher_disagreement_score":0.07409391,"about_ca_system_score_codex":0.0044394983,"about_ca_system_score_gemma":0.0077812574,"threshold_uncertainty_score":0.15208167},"labels":[],"label_agreement":null},{"id":"W4393646936","doi":"10.5281/zenodo.4775963","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Data science","score_opus":0.1093999890298455,"score_gpt":0.2569136690517907,"score_spread":0.1475136800219452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393646936","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034711196,0.00033953076,0.030935701,0.00078744086,0.00021081883,0.0008859111,0.9299632,0.008294851,0.025111444],"genre_scores_gemma":[0.009928906,0.0004457564,0.07022657,0.00025508978,0.000046846675,0.0014280237,0.90864307,0.0010461608,0.00797958],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99707687,0.0003446625,0.0007623473,0.00049025397,0.0011110997,0.00021479976],"domain_scores_gemma":[0.98979026,0.0014057495,0.0008410464,0.0027559288,0.004442826,0.0007640988],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029069022,0.0007381218,0.0010195854,0.008231574,0.0012581934,0.003633481,0.0027215313,0.0013414781,0.044899315],"category_scores_gemma":[0.010806245,0.0006667201,0.0012641348,0.014887295,0.00038637267,0.0054587284,0.0029125009,0.0019955568,0.030614028],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018900775,0.00014425677,0.0104836505,0.0010881562,0.0000635002,0.0001534481,0.00083881395,0.0016517016,0.0019535753,0.016651979,0.8390946,0.12768729],"study_design_scores_gemma":[0.00002610555,0.000017878356,0.012323842,0.00022131324,0.000022050477,0.000078631696,0.00055891793,0.0019579378,0.0009900011,0.004243125,0.979508,0.000052141368],"about_ca_topic_score_codex":0.0687276,"about_ca_topic_score_gemma":0.090087146,"teacher_disagreement_score":0.0687276,"about_ca_system_score_codex":0.0042837025,"about_ca_system_score_gemma":0.007737712,"threshold_uncertainty_score":0.15020317},"labels":[],"label_agreement":null},{"id":"W4393668943","doi":"10.5281/zenodo.5586016","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Construction engineering; Engineering","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393668943","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033659895,0.00032887032,0.028626291,0.00075254263,0.00020222427,0.0008423883,0.9346206,0.007826392,0.023434615],"genre_scores_gemma":[0.009557596,0.00042983555,0.065661475,0.0002451681,0.00004505478,0.0013911673,0.91427267,0.0009835066,0.0074136034],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970752,0.00034527053,0.0007651064,0.00049457507,0.0011038905,0.00021605179],"domain_scores_gemma":[0.98983765,0.0014038995,0.000846177,0.0027466356,0.0043998566,0.0007657443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028791819,0.0007408148,0.0010148745,0.008211277,0.0012466505,0.0035931228,0.0027002657,0.0013373406,0.044022687],"category_scores_gemma":[0.01083736,0.00066248997,0.0012639903,0.014820295,0.00038380807,0.005404803,0.0029183421,0.0019963288,0.030507905],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018869102,0.00014266692,0.010623542,0.0011007892,0.00006397208,0.00015135299,0.00082499656,0.0016353052,0.0019224855,0.016196499,0.8426201,0.124529704],"study_design_scores_gemma":[0.000026338093,0.000018010109,0.012723948,0.00022571831,0.000022188968,0.00007802379,0.0005640836,0.0019434148,0.0009813227,0.0042255563,0.97913915,0.000052219748],"about_ca_topic_score_codex":0.06823888,"about_ca_topic_score_gemma":0.089762546,"teacher_disagreement_score":0.06823888,"about_ca_system_score_codex":0.004247813,"about_ca_system_score_gemma":0.0076350817,"threshold_uncertainty_score":0.14727056},"labels":[],"label_agreement":null},{"id":"W4393723798","doi":"10.5281/zenodo.5576147","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393723798","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033659895,0.00032887032,0.028626291,0.00075254263,0.00020222427,0.0008423883,0.9346206,0.007826392,0.023434615],"genre_scores_gemma":[0.009557596,0.00042983555,0.065661475,0.0002451681,0.00004505478,0.0013911673,0.91427267,0.0009835066,0.0074136034],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970752,0.00034527053,0.0007651064,0.00049457507,0.0011038905,0.00021605179],"domain_scores_gemma":[0.98983765,0.0014038995,0.000846177,0.0027466356,0.0043998566,0.0007657443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028791819,0.0007408148,0.0010148745,0.008211277,0.0012466505,0.0035931228,0.0027002657,0.0013373406,0.044022687],"category_scores_gemma":[0.01083736,0.00066248997,0.0012639903,0.014820295,0.00038380807,0.005404803,0.0029183421,0.0019963288,0.030507905],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018869102,0.00014266692,0.010623542,0.0011007892,0.00006397208,0.00015135299,0.00082499656,0.0016353052,0.0019224855,0.016196499,0.8426201,0.124529704],"study_design_scores_gemma":[0.000026338093,0.000018010109,0.012723948,0.00022571831,0.000022188968,0.00007802379,0.0005640836,0.0019434148,0.0009813227,0.0042255563,0.97913915,0.000052219748],"about_ca_topic_score_codex":0.06823888,"about_ca_topic_score_gemma":0.089762546,"teacher_disagreement_score":0.06823888,"about_ca_system_score_codex":0.004247813,"about_ca_system_score_gemma":0.0076350817,"threshold_uncertainty_score":0.14727056},"labels":[],"label_agreement":null},{"id":"W4393772064","doi":"10.5281/zenodo.5607822","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Computer science; Database; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393772064","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033659895,0.00032887032,0.028626291,0.00075254263,0.00020222427,0.0008423883,0.9346206,0.007826392,0.023434615],"genre_scores_gemma":[0.009557596,0.00042983555,0.065661475,0.0002451681,0.00004505478,0.0013911673,0.91427267,0.0009835066,0.0074136034],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970752,0.00034527053,0.0007651064,0.00049457507,0.0011038905,0.00021605179],"domain_scores_gemma":[0.98983765,0.0014038995,0.000846177,0.0027466356,0.0043998566,0.0007657443],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028791819,0.0007408148,0.0010148745,0.008211277,0.0012466505,0.0035931228,0.0027002657,0.0013373406,0.044022687],"category_scores_gemma":[0.01083736,0.00066248997,0.0012639903,0.014820295,0.00038380807,0.005404803,0.0029183421,0.0019963288,0.030507905],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018869102,0.00014266692,0.010623542,0.0011007892,0.00006397208,0.00015135299,0.00082499656,0.0016353052,0.0019224855,0.016196499,0.8426201,0.124529704],"study_design_scores_gemma":[0.000026338093,0.000018010109,0.012723948,0.00022571831,0.000022188968,0.00007802379,0.0005640836,0.0019434148,0.0009813227,0.0042255563,0.97913915,0.000052219748],"about_ca_topic_score_codex":0.06823888,"about_ca_topic_score_gemma":0.089762546,"teacher_disagreement_score":0.06823888,"about_ca_system_score_codex":0.004247813,"about_ca_system_score_gemma":0.0076350817,"threshold_uncertainty_score":0.14727056},"labels":[],"label_agreement":null},{"id":"W4393822399","doi":"10.5281/zenodo.4360526","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393822399","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034429813,0.00034804514,0.03379301,0.00090128375,0.00022470774,0.0008856312,0.92174697,0.009323956,0.02933346],"genre_scores_gemma":[0.0100909155,0.0004416377,0.07021961,0.00027450337,0.000049181494,0.0013183528,0.9074203,0.001159291,0.009026253],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970733,0.0003404883,0.0007619157,0.00047119785,0.0011399238,0.00021321503],"domain_scores_gemma":[0.9899962,0.0013285382,0.00084348436,0.0026927313,0.004412744,0.00072629796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028592206,0.0007327575,0.0009616797,0.0079225,0.0012131204,0.0036937548,0.0028055776,0.0013149751,0.045460843],"category_scores_gemma":[0.010579679,0.0006394757,0.0012003416,0.014940726,0.0003979336,0.005405239,0.0028959326,0.0019368773,0.030386152],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015944423,0.00011973729,0.009286177,0.0009868247,0.000056346966,0.0001470847,0.00079731666,0.0015993158,0.0018131082,0.016794808,0.8452627,0.12297719],"study_design_scores_gemma":[0.000021866548,0.000015310172,0.011041916,0.00020266914,0.000018791037,0.000073458345,0.0005014134,0.0018405624,0.00093926926,0.0040185326,0.98127866,0.00004758548],"about_ca_topic_score_codex":0.07409391,"about_ca_topic_score_gemma":0.099029474,"teacher_disagreement_score":0.07409391,"about_ca_system_score_codex":0.0044394983,"about_ca_system_score_gemma":0.0077812574,"threshold_uncertainty_score":0.15208167},"labels":[],"label_agreement":null},{"id":"W4393889390","doi":"10.5281/zenodo.7850125","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2022,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation); Information retrieval","score_opus":0.06907710335345368,"score_gpt":0.2400311327959961,"score_spread":0.17095402944254243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393889390","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0034429813,0.00034804514,0.03379301,0.00090128375,0.00022470774,0.0008856312,0.92174697,0.009323956,0.02933346],"genre_scores_gemma":[0.0100909155,0.0004416377,0.07021961,0.00027450337,0.000049181494,0.0013183528,0.9074203,0.001159291,0.009026253],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9970733,0.0003404883,0.0007619157,0.00047119785,0.0011399238,0.00021321503],"domain_scores_gemma":[0.9899962,0.0013285382,0.00084348436,0.0026927313,0.004412744,0.00072629796],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028592206,0.0007327575,0.0009616797,0.0079225,0.0012131204,0.0036937548,0.0028055776,0.0013149751,0.045460843],"category_scores_gemma":[0.010579679,0.0006394757,0.0012003416,0.014940726,0.0003979336,0.005405239,0.0028959326,0.0019368773,0.030386152],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015944423,0.00011973729,0.009286177,0.0009868247,0.000056346966,0.0001470847,0.00079731666,0.0015993158,0.0018131082,0.016794808,0.8452627,0.12297719],"study_design_scores_gemma":[0.000021866548,0.000015310172,0.011041916,0.00020266914,0.000018791037,0.000073458345,0.0005014134,0.0018405624,0.00093926926,0.0040185326,0.98127866,0.00004758548],"about_ca_topic_score_codex":0.07409391,"about_ca_topic_score_gemma":0.099029474,"teacher_disagreement_score":0.07409391,"about_ca_system_score_codex":0.0044394983,"about_ca_system_score_gemma":0.0077812574,"threshold_uncertainty_score":0.15208167},"labels":[],"label_agreement":null},{"id":"W4393928628","doi":"10.1007/s41693-024-00117-x","title":"Integrating lean and robotics in the construction sector: a scientometric analysis","year":2024,"lang":"en","type":"article","venue":"Construction Robotics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Robotics; Artificial intelligence; Manufacturing engineering; Engineering; Computer science; Robot","score_opus":0.014155584190876334,"score_gpt":0.23507196840438824,"score_spread":0.2209163842135119,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393928628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9585965,0.00045219195,0.011655708,0.00016898355,0.000020987998,0.00013545412,0.0026820286,0.00010138767,0.026186775],"genre_scores_gemma":[0.9925419,0.0003372967,0.0031328993,0.000014873061,0.00003132343,0.000069571994,0.0026535576,0.00003402212,0.0011844446],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9920644,0.002269395,0.00057503814,0.00039285052,0.0041584275,0.0005400062],"domain_scores_gemma":[0.9747897,0.012306575,0.0028805174,0.0019285608,0.007585347,0.0005094295],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.009648586,0.0006700337,0.001048361,0.037205372,0.0011688587,0.0029985914,0.00074669684,0.0005842374,0.0055018826],"category_scores_gemma":[0.035805337,0.00034737593,0.002316682,0.051889647,0.0014054518,0.002505207,0.0029339655,0.00047897728,0.0014185741],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000383014,0.00042363393,0.7934889,0.0004580466,0.0007757188,0.00026067166,0.0020645335,0.027200276,0.0013850823,0.012213172,0.005080036,0.15626687],"study_design_scores_gemma":[0.000015440879,0.00023582565,0.955048,0.00008374905,0.00022922842,0.00018447763,0.0036808122,0.02812291,0.0006337275,0.004010043,0.007706096,0.000049759274],"about_ca_topic_score_codex":0.02195993,"about_ca_topic_score_gemma":0.017831977,"teacher_disagreement_score":0.9627946,"about_ca_system_score_codex":0.0017703898,"about_ca_system_score_gemma":0.0030007001,"threshold_uncertainty_score":0.05102724},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"}],"label_agreement":"agree"},{"id":"W4393966878","doi":"10.5281/zenodo.4360527","title":"A Construction Classification System Database for Understanding Resource Use in Building Construction","year":2020,"lang":"en","type":"dataset","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Toronto","funders":"","keywords":"Database; Computer science; Resource (disambiguation)","score_opus":0.0761944262738567,"score_gpt":0.2391504150267769,"score_spread":0.1629559887529202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4393966878","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0019607572,0.00012239607,0.00075297634,0.00008339009,0.000032148364,0.00006176599,0.9937977,0.0009451621,0.0022437451],"genre_scores_gemma":[0.0012111241,0.00004782655,0.0010330377,0.00001892884,0.000002783531,0.00007985095,0.99712294,0.000034897777,0.0004485412],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989072,0.00013396537,0.00017556627,0.00027554625,0.00035845692,0.00014929603],"domain_scores_gemma":[0.998858,0.00012841779,0.00012563325,0.00032035713,0.0004171834,0.00015035212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088142813,0.001657886,0.0009982388,0.004343015,0.0007915269,0.0015455001,0.0026795592,0.0015592002,0.013567675],"category_scores_gemma":[0.002408292,0.0004932205,0.0011835655,0.006829099,0.00034306542,0.0015853817,0.0019961114,0.0013824683,0.023633707],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021399399,0.00014638617,0.008063324,0.0011048765,0.00008555259,0.00012256514,0.00015517758,0.0018493453,0.0009953125,0.0026583213,0.96475637,0.019848717],"study_design_scores_gemma":[0.00010503779,0.00003781616,0.033362415,0.0002806952,0.000043931195,0.00020164033,0.00037657542,0.0034039253,0.0013767373,0.0019602648,0.9587874,0.000063511055],"about_ca_topic_score_codex":0.038328204,"about_ca_topic_score_gemma":0.08114394,"teacher_disagreement_score":0.038328204,"about_ca_system_score_codex":0.002389459,"about_ca_system_score_gemma":0.0021168916,"threshold_uncertainty_score":0.0762102},"labels":[],"label_agreement":null},{"id":"W4394571638","doi":"10.1061/ppscfx.sceng-1425","title":"Universal Structural Design Criteria for Heavy Industrial Projects","year":2024,"lang":"en","type":"article","venue":"Practice Periodical on Structural Design and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Communications Research Centre Canada","funders":"","keywords":"Construction engineering; Engineering; Civil engineering; Business; Forensic engineering","score_opus":0.053530357362322506,"score_gpt":0.2943517418558906,"score_spread":0.24082138449356807,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394571638","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025022823,0.0011809842,0.85042304,0.0004725919,0.00016662988,0.00036647968,0.0003139464,0.0005255615,0.12152788],"genre_scores_gemma":[0.4573244,0.0012260611,0.51546746,0.00027363186,0.00016805377,0.00095598353,0.0006980758,0.0005347536,0.023351548],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9917685,0.002066322,0.0007968045,0.0004100329,0.0043113437,0.00064700656],"domain_scores_gemma":[0.99466646,0.0014662328,0.0006173359,0.00043314174,0.0024904106,0.00032647146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004700426,0.0014741276,0.00079375406,0.0031271933,0.0014006951,0.0020055892,0.0016371727,0.0015562522,0.0108711235],"category_scores_gemma":[0.009469956,0.00061609957,0.00063272455,0.0014027748,0.0021312595,0.0021540239,0.003164127,0.001191928,0.0023492342],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008318353,0.00007795746,0.0024004334,0.0006571119,0.000020960966,0.00073923357,0.0009090036,0.12123945,0.010662658,0.70639795,0.015874524,0.14093743],"study_design_scores_gemma":[0.00007760691,0.00043762077,0.0029911774,0.00108794,0.000064138,0.0028076635,0.0017714635,0.17333668,0.011642727,0.41928488,0.38633054,0.00016759544],"about_ca_topic_score_codex":0.002131514,"about_ca_topic_score_gemma":0.0028347352,"teacher_disagreement_score":0.0108711235,"about_ca_system_score_codex":0.001474579,"about_ca_system_score_gemma":0.0019069015,"threshold_uncertainty_score":0.036367476},"labels":[],"label_agreement":null},{"id":"W4394762557","doi":"10.3390/app14083244","title":"The Development of an Automated System for a Quality Evaluation of Engineering BIM Models: A Case Study","year":2024,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Building information modeling; Visualization; Computer science; Database; Systems engineering; Quality (philosophy); Software engineering; Engineering; Data mining; Operations management","score_opus":0.08244500862354975,"score_gpt":0.3419511979695829,"score_spread":0.25950618934603314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394762557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47032413,0.00016415124,0.5097371,0.00046661167,0.00006889496,0.0022179426,0.00090868236,0.010538158,0.0055744024],"genre_scores_gemma":[0.4802344,0.00011544336,0.514461,0.00006850786,0.000017223409,0.0009088026,0.0009872102,0.00043784652,0.0027695552],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99560815,0.0016565353,0.00031543762,0.00057060283,0.0016143883,0.00023482325],"domain_scores_gemma":[0.9936454,0.0020677485,0.0003043667,0.0014703167,0.002167173,0.00034493397],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0060245376,0.00076424284,0.00073035446,0.0015223244,0.0007074185,0.001555091,0.0019775257,0.0013063288,0.0026661581],"category_scores_gemma":[0.009081303,0.0005699087,0.00067126565,0.0011413182,0.0007231675,0.0017574783,0.0015401382,0.0007197919,0.0011664418],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012258893,0.0042282413,0.043510355,0.0012938109,0.00014793135,0.0045538065,0.008787647,0.08206262,0.11991529,0.009976338,0.012880278,0.71141773],"study_design_scores_gemma":[0.0004620227,0.0025763575,0.035054184,0.0003428002,0.00020134493,0.0024213626,0.0026508465,0.7052905,0.18797156,0.002806971,0.059935905,0.00028619095],"about_ca_topic_score_codex":0.0050310986,"about_ca_topic_score_gemma":0.0030150383,"teacher_disagreement_score":0.0060245376,"about_ca_system_score_codex":0.00119686,"about_ca_system_score_gemma":0.0019832077,"threshold_uncertainty_score":0.031861186},"labels":[],"label_agreement":null},{"id":"W4394770052","doi":"10.1016/j.inffus.2024.102423","title":"Artificial intelligence for production, operations and logistics management in modular construction industry: A systematic literature review","year":2024,"lang":"en","type":"article","venue":"Information Fusion","topic":"BIM and Construction Integration","field":"Engineering","cited_by":54,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Ministry of Education of the People's Republic of China; National Social Science Fund of China; National Natural Science Foundation of China; Hubei Provincial Department of Education","keywords":"Modular design; Computer science; Context (archaeology); Industry 4.0; Production (economics); Systematic review; Engineering management; Knowledge management; Management science; Engineering","score_opus":0.014744349078772314,"score_gpt":0.24467609475896554,"score_spread":0.22993174568019323,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394770052","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017509185,0.9967571,0.00045504025,0.00031319258,0.00004734403,0.00010323643,0.00014421382,0.000005068755,0.00042387526],"genre_scores_gemma":[0.01419011,0.9832424,0.0018474689,0.00034301347,0.000046033645,0.0001306502,0.00012389239,0.0000032543542,0.000073232644],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.995993,0.0013122804,0.0013130171,0.0003560889,0.0009055857,0.00011994219],"domain_scores_gemma":[0.97261184,0.023330001,0.0021368929,0.00030014655,0.0014352072,0.00018593846],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.00788175,0.0009916584,0.003195533,0.012157227,0.0005500813,0.0031623677,0.00129734,0.0017709503,0.002620025],"category_scores_gemma":[0.024850983,0.000689535,0.003404136,0.011835089,0.0010802561,0.0028002611,0.0015747794,0.001248472,0.00023036216],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015779198,0.00013322044,0.0037125105,0.63473886,0.0046718395,0.00024710552,0.0009245215,0.00069462485,0.0003665179,0.0016415778,0.0028181435,0.34989327],"study_design_scores_gemma":[0.000118734744,0.00033375286,0.013057996,0.8752465,0.0336567,0.00095785805,0.001870739,0.00078948005,0.0004895864,0.0025229736,0.070845164,0.00011035635],"about_ca_topic_score_codex":0.0068866177,"about_ca_topic_score_gemma":0.022035053,"teacher_disagreement_score":0.9878428,"about_ca_system_score_codex":0.0018774333,"about_ca_system_score_gemma":0.0110685425,"threshold_uncertainty_score":0.041683137},"labels":[],"label_agreement":null},{"id":"W4394834800","doi":"10.4322/rae.v12n2.e201716.en","title":"SIMULATION SUPPORTS AS INTERMEDIATE DESIGN OBJECTS: EXPERIENCES IN THE PETROLEUM REFINING INDUSTRY","year":2017,"lang":"en","type":"article","venue":"Revista Ação Ergonômica","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Discovery Air (Canada)","funders":"","keywords":"Refining (metallurgy); Oil refinery; Petroleum industry; Petroleum engineering; Petroleum; Computer science; Process engineering; Manufacturing engineering; Biochemical engineering; Engineering; Chemistry; Waste management; Metallurgy; Materials science; Environmental engineering; Organic chemistry","score_opus":0.02640431256823984,"score_gpt":0.2765881885410242,"score_spread":0.25018387597278435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394834800","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8005507,0.000929147,0.07469284,0.0035242792,0.00015731524,0.0002431699,0.00018318668,0.0005701021,0.11914934],"genre_scores_gemma":[0.9548472,0.00083129253,0.020847416,0.00022975511,0.000017440423,0.00011387551,0.00015762597,0.00017192082,0.022783576],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.996566,0.0025301795,0.000084767446,0.0001370963,0.00043635623,0.00024560245],"domain_scores_gemma":[0.99630773,0.002349554,0.00012132551,0.00035749597,0.00031756517,0.0005462182],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033242109,0.0008149418,0.00046867953,0.00064286223,0.0025651031,0.0053634997,0.0016244835,0.0027497304,0.010764948],"category_scores_gemma":[0.0061014183,0.0004191909,0.00084298366,0.000793947,0.00401819,0.0028107332,0.0043227216,0.0017873275,0.0015415759],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002050565,0.0036513521,0.019632144,0.0013453617,0.00013305775,0.0077915424,0.46891248,0.11406306,0.021960005,0.15332544,0.017475862,0.18965918],"study_design_scores_gemma":[0.0003586254,0.0030565541,0.005626286,0.001072975,0.00012456161,0.0022778462,0.21930897,0.09015886,0.017324239,0.052652005,0.60767317,0.00036591792],"about_ca_topic_score_codex":0.003739724,"about_ca_topic_score_gemma":0.005709988,"teacher_disagreement_score":0.010764948,"about_ca_system_score_codex":0.0020341412,"about_ca_system_score_gemma":0.0018996422,"threshold_uncertainty_score":0.03601235},"labels":[],"label_agreement":null},{"id":"W4394912932","doi":"10.5267/j.ijdns.2024.4.004","title":"Quantitative exploration of digital facility management adoption among United Arab Emirates facility managers","year":2024,"lang":"en","type":"article","venue":"International Journal of Data and Network Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Facility management; Business; Engineering management; Operations management; Engineering; Marketing","score_opus":0.04548565903498236,"score_gpt":0.291006665308699,"score_spread":0.24552100627371665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394912932","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9982291,0.00011455298,0.00031922187,0.000084796906,0.000001595118,0.000026029928,0.00006906397,0.0000026373843,0.0011531125],"genre_scores_gemma":[0.9982621,0.00022287165,0.0008875199,0.00004402696,0.0000034728907,0.00006984094,0.000063569554,0.0000015473108,0.00044507257],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9980116,0.0010803314,0.00015019979,0.00012332709,0.00045485082,0.00017970888],"domain_scores_gemma":[0.9893405,0.005699679,0.002443496,0.00024119335,0.0019917355,0.0002834222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045991237,0.00022307642,0.00020376727,0.0023203436,0.00068681914,0.0012628764,0.00034606023,0.00040262972,0.0016636598],"category_scores_gemma":[0.0121254,0.00021896156,0.00018842932,0.0018887592,0.0005768602,0.00095515116,0.0007897764,0.00037304946,0.00018096097],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010382338,0.00035117136,0.8244875,0.00056454714,0.000049165483,0.00039478965,0.084495686,0.00036295093,0.002722954,0.0010228021,0.00045079985,0.08499371],"study_design_scores_gemma":[0.000006055781,0.0006101339,0.790963,0.00038142828,0.000036140158,0.00022658902,0.19907953,0.0009490486,0.0011059684,0.00015909677,0.006450728,0.00003223677],"about_ca_topic_score_codex":0.006324548,"about_ca_topic_score_gemma":0.012926744,"teacher_disagreement_score":0.006324548,"about_ca_system_score_codex":0.0010311656,"about_ca_system_score_gemma":0.0013102064,"threshold_uncertainty_score":0.024322808},"labels":[],"label_agreement":null},{"id":"W4394927140","doi":"10.36680/j.itcon.2024.014","title":"Development of standard-based information requirements for the facility management of a canteen","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"MIT Portugal; Fundação para a Ciência e a Tecnologia; Ministério da Ciência, Tecnologia e Ensino Superior","keywords":"Systems engineering; Facility management; Engineering; Engineering management; Computer science; Software engineering; Business","score_opus":0.009104826860086975,"score_gpt":0.2316689763949585,"score_spread":0.22256414953487152,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394927140","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07649339,0.0009871391,0.7538494,0.0044913944,0.00055925845,0.008309837,0.0056464905,0.002809452,0.14685374],"genre_scores_gemma":[0.1919787,0.0011494325,0.7769692,0.0006249213,0.00010081572,0.0062840995,0.009965022,0.0005036824,0.012424062],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.95932466,0.011754954,0.0073027126,0.001596345,0.018244008,0.0017773072],"domain_scores_gemma":[0.948069,0.015589864,0.004332201,0.005490095,0.025627073,0.0008917339],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02909683,0.0016016465,0.0009993098,0.008917787,0.0023989128,0.006611086,0.0032661436,0.0033132776,0.004439184],"category_scores_gemma":[0.04361656,0.001023885,0.0014805977,0.0042149895,0.0022620051,0.005943655,0.0036920304,0.0028016958,0.0026671067],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002925772,0.0010388914,0.01139991,0.003250579,0.00007746851,0.0026254316,0.016248288,0.06717046,0.037798095,0.46511915,0.04475759,0.35022154],"study_design_scores_gemma":[0.00012901936,0.00069298747,0.018887915,0.0062599485,0.0001863289,0.002116437,0.015956083,0.086578056,0.04810321,0.06922456,0.75120467,0.00066073256],"about_ca_topic_score_codex":0.018148934,"about_ca_topic_score_gemma":0.016196648,"teacher_disagreement_score":0.02909683,"about_ca_system_score_codex":0.008255244,"about_ca_system_score_gemma":0.014349468,"threshold_uncertainty_score":0.1538806},"labels":[],"label_agreement":null},{"id":"W4394956535","doi":"10.3390/buildings14041151","title":"Design Analysis of Mass Timber and Volumetric Modular Strategies as Counterproposals for an Existing Reinforced Concrete Hotel","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Montréal; Université du Québec à Chicoutimi","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Modular design; Structural engineering; Engineering; Computer science; Architectural engineering; Civil engineering; Programming language","score_opus":0.01983606079689911,"score_gpt":0.26683355604903114,"score_spread":0.24699749525213202,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394956535","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.91241574,0.00010287505,0.06808495,0.000049618055,0.000012528622,0.0003604802,0.00007898452,0.00009005291,0.01880475],"genre_scores_gemma":[0.95787644,0.00006331695,0.03990262,0.000010184309,0.0000012913761,0.00011262821,0.00003409867,0.000023029228,0.0019763333],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995142,0.0002009772,0.000014726938,0.000050144103,0.00012379601,0.00009614396],"domain_scores_gemma":[0.9995908,0.0001657069,0.00006704882,0.00004146696,0.00007669011,0.000058178022],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092705153,0.0006608977,0.0002790071,0.00061091885,0.0002657193,0.0011378851,0.0007067416,0.0005451353,0.0027533222],"category_scores_gemma":[0.00079672993,0.00025807897,0.0004373046,0.00024079804,0.0005200352,0.00031705628,0.0004918128,0.0002894149,0.0002698777],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007977053,0.000628874,0.008685728,0.00052237016,0.00007414022,0.00044853578,0.0005141784,0.8239827,0.07420562,0.016380828,0.00032520187,0.07343402],"study_design_scores_gemma":[0.00009442596,0.0042342576,0.013412032,0.00005828277,0.00015728727,0.00017385473,0.0017300205,0.9508312,0.023257438,0.0021557696,0.0038477364,0.000047832353],"about_ca_topic_score_codex":0.0036095197,"about_ca_topic_score_gemma":0.008634299,"teacher_disagreement_score":0.0036095197,"about_ca_system_score_codex":0.0011301877,"about_ca_system_score_gemma":0.0012587431,"threshold_uncertainty_score":0.009210765},"labels":[],"label_agreement":null},{"id":"W4394970279","doi":"","title":"Exploring the Design of Animated Transitions between Abstract and Concrete Visualizations in Immersive Environments","year":2024,"lang":"en","type":"preprint","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada; Agence Nationale de la Recherche","keywords":"Computer science; Human–computer interaction; Computer graphics (images); Animation","score_opus":0.03679362608210144,"score_gpt":0.22818692153699724,"score_spread":0.1913932954548958,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394970279","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.16354482,0.00036915683,0.824701,0.0003864853,0.00006660757,0.00030612393,0.00013350988,0.0016277907,0.00886453],"genre_scores_gemma":[0.563504,0.00023617149,0.43333453,0.00008050886,0.000009067894,0.0003947023,0.00018011911,0.00039291778,0.0018679673],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977914,0.0014291983,0.00010554074,0.0002759023,0.0002474031,0.00015060221],"domain_scores_gemma":[0.9940977,0.004186163,0.00036145313,0.0007840172,0.00029276867,0.00027782188],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029858993,0.0010508667,0.0003817402,0.00059563067,0.0005847327,0.0032648877,0.0012267809,0.00097339955,0.005245511],"category_scores_gemma":[0.013366645,0.00074241596,0.00069987023,0.00031160115,0.0019509251,0.003865366,0.003318661,0.0010591873,0.00057192397],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019418844,0.0009257297,0.0114454115,0.0033624538,0.0002648432,0.002015036,0.08570046,0.1412168,0.22815628,0.23397176,0.0048557436,0.28614366],"study_design_scores_gemma":[0.0007324648,0.002858762,0.012992227,0.0017034928,0.00041395985,0.0018246153,0.022409104,0.49356464,0.093341604,0.18867968,0.1810657,0.00041375853],"about_ca_topic_score_codex":0.0004870004,"about_ca_topic_score_gemma":0.0010586022,"teacher_disagreement_score":0.005245511,"about_ca_system_score_codex":0.00044965307,"about_ca_system_score_gemma":0.0004965173,"threshold_uncertainty_score":0.017547965},"labels":[],"label_agreement":null},{"id":"W4394996194","doi":"10.1016/j.cie.2024.110173","title":"Digital twin for production estimation, scheduling and real-time monitoring in offsite construction","year":2024,"lang":"en","type":"article","venue":"Computers & Industrial Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Scheduling (production processes); Estimation; Production (economics); Computer science; Real-time computing; Engineering; Operations management; Systems engineering; Economics","score_opus":0.013939764796656328,"score_gpt":0.21233667397358585,"score_spread":0.19839690917692954,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4394996194","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08276738,0.00017694119,0.9115358,0.000048218735,0.000051447125,0.000053925385,0.0001620772,0.0019178104,0.0032863922],"genre_scores_gemma":[0.6896439,0.00018766352,0.30780852,0.000021615735,0.000015226156,0.000053922602,0.00029381335,0.00016586205,0.0018094889],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991788,0.00016017891,0.000038177688,0.00016522728,0.00041967936,0.000037905742],"domain_scores_gemma":[0.99903214,0.0002608539,0.00018637854,0.00021099605,0.00024553845,0.00006412472],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008348631,0.00050974387,0.00046524213,0.0013065733,0.00023721627,0.0007447007,0.00078404596,0.00031401677,0.0019058735],"category_scores_gemma":[0.002345394,0.00036575648,0.00024424586,0.001552685,0.00037755386,0.0010539743,0.00091110973,0.00034964303,0.00036381095],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008336063,0.00018957235,0.014439272,0.00021979226,0.000043279575,0.00017585878,0.00040340214,0.20744054,0.07944739,0.0075255237,0.0026148327,0.6866669],"study_design_scores_gemma":[0.000022889646,0.00028062303,0.0066386363,0.000019342835,0.000032890784,0.0002112994,0.0001348778,0.9363569,0.046650473,0.002424463,0.007181977,0.000045668556],"about_ca_topic_score_codex":0.0022170446,"about_ca_topic_score_gemma":0.0039079054,"teacher_disagreement_score":0.0022170446,"about_ca_system_score_codex":0.0006007502,"about_ca_system_score_gemma":0.0007870544,"threshold_uncertainty_score":0.0063758492},"labels":[],"label_agreement":null},{"id":"W4395016304","doi":"10.1007/978-3-031-53521-5_4","title":"The Role of CAD and PLM in Ecodesign: A Short Review","year":2024,"lang":"en","type":"review","venue":"Decision engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Ecodesign; CAD; Engineering; Systems engineering; Manufacturing engineering; Engineering drawing","score_opus":0.015501867868175392,"score_gpt":0.2715237901023975,"score_spread":0.25602192223422215,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395016304","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00003859307,0.9993886,0.000082613136,0.000121999445,0.00011150918,0.0000029325147,0.000014254945,0.000002315785,0.00023721386],"genre_scores_gemma":[0.00029133214,0.99905926,0.0002017387,0.0001693658,0.00013018523,0.00000444537,0.00001900757,0.0000012362866,0.00012355382],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99938583,0.00012616947,0.00012404918,0.00012584512,0.00019725508,0.000040797488],"domain_scores_gemma":[0.99696285,0.0020449585,0.0003250201,0.000059698734,0.00051413325,0.000093351446],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021005573,0.001395927,0.0024234843,0.0051528625,0.00034783027,0.0020633216,0.0013444679,0.0020623156,0.0056975703],"category_scores_gemma":[0.0036256106,0.0006402383,0.0010424843,0.006694338,0.00086521433,0.0029710352,0.0013192847,0.0017015251,0.0018781564],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000094136885,0.00008544948,0.00023979277,0.07768056,0.00020177351,0.0001409942,0.000083361774,0.0004553975,0.0007732143,0.003521964,0.01989312,0.8968303],"study_design_scores_gemma":[0.0000464845,0.0001995579,0.0015065597,0.03512364,0.0008136951,0.0008813514,0.00019158708,0.0002040348,0.00045944058,0.0024870092,0.9580283,0.000058161175],"about_ca_topic_score_codex":0.0025462566,"about_ca_topic_score_gemma":0.0059110667,"teacher_disagreement_score":0.0056975703,"about_ca_system_score_codex":0.0009529187,"about_ca_system_score_gemma":0.002824663,"threshold_uncertainty_score":0.019060314},"labels":[],"label_agreement":null},{"id":"W4395683654","doi":"10.18280/ijsse.140222","title":"An Artificial Neural Network Approach for Construction Project Risk Management","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Computer science; Risk management; Risk analysis (engineering); Construction engineering; Engineering; Artificial intelligence; Business","score_opus":0.007468874893476163,"score_gpt":0.22507957109454096,"score_spread":0.2176106962010648,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4395683654","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09295836,0.0018648055,0.8926636,0.0009502914,0.0001547048,0.0002311836,0.00026580106,0.0004746829,0.010436581],"genre_scores_gemma":[0.8655278,0.0012136218,0.12699729,0.00014841992,0.000085245185,0.0004939189,0.0003128648,0.000026421256,0.0051944912],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949443,0.00020040419,0.000049023045,0.000088604,0.00011536805,0.00005224322],"domain_scores_gemma":[0.9993412,0.000374757,0.00006966672,0.000014037776,0.00017744911,0.000022797078],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011089415,0.0008391021,0.00060783315,0.0012894382,0.00044209877,0.0013420698,0.0012093724,0.0014888126,0.001860134],"category_scores_gemma":[0.0023997552,0.00040227253,0.00057093136,0.0013340274,0.0003241814,0.0009060692,0.0007762697,0.0011451141,0.00021567494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000042580086,0.000064168315,0.0018333503,0.000050304894,0.00006185129,0.00008272673,0.000047919253,0.95491433,0.00028708452,0.0021735684,0.00040830247,0.040033784],"study_design_scores_gemma":[0.000002097714,0.000011492535,0.0002301126,0.000009555674,0.000006296051,0.000005738992,0.000014367602,0.9984724,0.00006578253,0.0010044571,0.0001735294,0.000004127748],"about_ca_topic_score_codex":0.013472097,"about_ca_topic_score_gemma":0.011458671,"teacher_disagreement_score":0.013472097,"about_ca_system_score_codex":0.0012434935,"about_ca_system_score_gemma":0.0011987688,"threshold_uncertainty_score":0.0267874},"labels":[],"label_agreement":null},{"id":"W4396230282","doi":"10.18280/ts.410206","title":"Optimizing Building Information Modeling System Design Elements for Enhanced User Experience: A Multidimensional Approach","year":2024,"lang":"en","type":"article","venue":"Traitement du signal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Building information modeling; Systems engineering; Human–computer interaction; Engineering; Operations management","score_opus":0.020833007963775508,"score_gpt":0.2357003749310742,"score_spread":0.2148673669672987,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396230282","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09718077,0.00016743425,0.89630175,0.00014714625,0.000011555365,0.00011787685,0.00010081994,0.00051988434,0.0054527726],"genre_scores_gemma":[0.67643946,0.00014707369,0.3212382,0.000030153555,0.00000511329,0.00012823127,0.0001605126,0.00016769966,0.0016835481],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9987803,0.00059671287,0.00006167658,0.00011386081,0.00036025743,0.00008717266],"domain_scores_gemma":[0.9987569,0.0006324135,0.00010931747,0.00017991084,0.0002906169,0.00003084882],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014005597,0.0010443128,0.000851566,0.0012212767,0.0004101602,0.0020795194,0.0007876202,0.00082137337,0.0033113663],"category_scores_gemma":[0.0030309155,0.0008163638,0.00074519904,0.0008463734,0.00044432786,0.00176097,0.0013974067,0.0005082706,0.00047588337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032149727,0.00037306699,0.00345397,0.00030836905,0.00011097814,0.00011584558,0.0005495318,0.77816904,0.056452952,0.012709104,0.0007063055,0.14672926],"study_design_scores_gemma":[0.000012033355,0.00012856956,0.0008962315,0.000015440231,0.00005192075,0.00003431438,0.0001689253,0.983036,0.012359941,0.001999842,0.001277095,0.000019684954],"about_ca_topic_score_codex":0.0023711629,"about_ca_topic_score_gemma":0.0032781668,"teacher_disagreement_score":0.0033113663,"about_ca_system_score_codex":0.0007303349,"about_ca_system_score_gemma":0.00080822146,"threshold_uncertainty_score":0.011077642},"labels":[],"label_agreement":null},{"id":"W4396709979","doi":"10.11159/csee24","title":"Proceedings of the 9th World Congress on Civil, Structural, and Environmental Engineering","year":2024,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Engineering; Political science","score_opus":0.00464622513290687,"score_gpt":0.18137927987041563,"score_spread":0.17673305473750878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396709979","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0024605123,0.015592727,0.005013058,0.018569952,0.075775474,0.00030000898,0.0031220317,0.0005107354,0.87865543],"genre_scores_gemma":[0.0041570626,0.005197783,0.0012060959,0.0009558626,0.003317034,0.00012193072,0.0019725615,0.00022353166,0.98284805],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99895954,0.00016879116,0.000043956155,0.000112376765,0.00059968635,0.00011562366],"domain_scores_gemma":[0.99867463,0.00018183753,0.000054505133,0.000094748735,0.00068283465,0.0003114036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017147027,0.001234635,0.00073768303,0.0014360298,0.0013648038,0.006176393,0.00090249523,0.0016586881,0.26096326],"category_scores_gemma":[0.0018847856,0.00018776215,0.00042639725,0.0012509259,0.00077882595,0.0028588534,0.002266028,0.0027838452,0.11880341],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029997222,0.000036212,0.00009761271,0.00011023742,0.0000034312027,0.00003502431,0.00003892371,0.00011194864,0.00028819434,0.0034193732,0.9524211,0.043407816],"study_design_scores_gemma":[0.0000018961105,0.0000075250027,0.00025546196,0.00006384265,0.0000011490537,0.000021478627,0.00004090585,0.00007558999,0.00009601025,0.0005321832,0.9989011,0.0000027479641],"about_ca_topic_score_codex":0.00260401,"about_ca_topic_score_gemma":0.0074356403,"teacher_disagreement_score":0.26096326,"about_ca_system_score_codex":0.0015426162,"about_ca_system_score_gemma":0.0028424393,"threshold_uncertainty_score":0.8730091},"labels":[],"label_agreement":null},{"id":"W4396721030","doi":"10.21814/uminho.ed.164.14","title":"Interoperabilidade BIM-FM: Desenvolvimento de interface customizada para visualização IFC integrada a plataforma de gestão","year":2024,"lang":"pt","type":"book-chapter","venue":"UMinho Editora eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Computer science","score_opus":0.01824542945123212,"score_gpt":0.26289446524338667,"score_spread":0.24464903579215455,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396721030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031157594,0.00033251737,0.91471124,0.0006076157,0.00009330172,0.00046634133,0.00056122075,0.012049622,0.040020525],"genre_scores_gemma":[0.48298568,0.0006126805,0.4923849,0.00040643525,0.00004050811,0.0008886282,0.0020854375,0.0033016289,0.017294073],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9930316,0.0016684197,0.0004503565,0.0009883344,0.0033273587,0.0005339154],"domain_scores_gemma":[0.9934929,0.0016748412,0.00036993893,0.0022237843,0.0019244148,0.0003140748],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062088487,0.0014031129,0.0007311782,0.0029736494,0.0010813593,0.0056672418,0.0018833957,0.0014125515,0.008411072],"category_scores_gemma":[0.014510498,0.000776461,0.0013167916,0.002209588,0.0016021042,0.005052063,0.006614907,0.002008121,0.0025786576],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005019213,0.0005162489,0.007945143,0.0012170665,0.00017273432,0.0008409215,0.0104154805,0.03885334,0.075757936,0.117815115,0.02011058,0.7258534],"study_design_scores_gemma":[0.000109067994,0.0004903232,0.013071439,0.0010086241,0.0003009846,0.001308985,0.0045697046,0.35478678,0.1286075,0.09108961,0.40428203,0.00037497166],"about_ca_topic_score_codex":0.008541411,"about_ca_topic_score_gemma":0.0051551685,"teacher_disagreement_score":0.008541411,"about_ca_system_score_codex":0.0017936409,"about_ca_system_score_gemma":0.0027896424,"threshold_uncertainty_score":0.03283596},"labels":[],"label_agreement":null},{"id":"W4396761923","doi":"10.2175/193864718825159350","title":"Delivering Projects using Community Based Partnership to meet Chesapeake Bay TMDL Requirements in Prince George's County, MD and Key Lessons Learned","year":2024,"lang":"en","type":"article","venue":"Proceedings of the Water Environment Federation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"George (robot); Chesapeake bay; General partnership; Key (lock); Computer science; Bay; Engineering; Aeronautics; Environmental science; Operations research; Political science; Computer security; Oceanography; Civil engineering; Estuary; Geology; Law","score_opus":0.05588441239115496,"score_gpt":0.25769198845676883,"score_spread":0.20180757606561386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396761923","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.068211414,0.006662332,0.035615284,0.679498,0.0073076566,0.0051210914,0.0008316784,0.0016410793,0.1951114],"genre_scores_gemma":[0.29129896,0.020637995,0.15514529,0.105178915,0.002492848,0.008745017,0.0025450229,0.00064490846,0.41331103],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.9934354,0.0016535446,0.00017881475,0.00041335187,0.002286621,0.0020323184],"domain_scores_gemma":[0.9785477,0.0010293454,0.00039212214,0.00042492792,0.003252263,0.016353663],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006355682,0.0008648212,0.00022097581,0.0006248198,0.0056238007,0.0041498053,0.0028688577,0.0037491554,0.029894145],"category_scores_gemma":[0.0065290006,0.0005334017,0.0006202709,0.0004886332,0.0011628711,0.0030062145,0.012232491,0.0051037804,0.0054334383],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006729495,0.001447336,0.006705242,0.0007472626,0.00002659092,0.0021949483,0.0060083913,0.0017392116,0.004272391,0.009440886,0.62661356,0.34073687],"study_design_scores_gemma":[0.00015307231,0.0007461789,0.014389012,0.0009026467,0.000013264579,0.001105542,0.014808629,0.0015620168,0.001370998,0.003423882,0.9614506,0.000074222604],"about_ca_topic_score_codex":0.051091153,"about_ca_topic_score_gemma":0.13938555,"teacher_disagreement_score":0.051091153,"about_ca_system_score_codex":0.0060930382,"about_ca_system_score_gemma":0.04543677,"threshold_uncertainty_score":0.101587534},"labels":[],"label_agreement":null},{"id":"W4396869504","doi":"10.20944/preprints202405.0681.v1","title":"Integrating Building Information Modeling (BIM) and Life Cycle Cost Analysis (LCCA) to Evaluate the Economic Benefits of Designing Aging-in-Place Homes at the Conceptual Stage","year":2024,"lang":"en","type":"preprint","venue":"Preprints.org","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Life-cycle cost analysis; Building information modeling; Stage (stratigraphy); Conceptual framework; Architectural engineering; Computer science; Operations management; Engineering; Risk analysis (engineering); Business; Sociology","score_opus":0.056295888800140755,"score_gpt":0.30074186254438334,"score_spread":0.2444459737442426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396869504","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.044958428,0.0006556088,0.9332315,0.00041250084,0.00006278757,0.0004911716,0.0008183426,0.000593222,0.018776491],"genre_scores_gemma":[0.50482273,0.0008935438,0.48949978,0.000119044445,0.00003027219,0.00079523656,0.001096315,0.00023391543,0.0025091048],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9976611,0.00091903884,0.000105383435,0.00017872948,0.0009965516,0.00013927511],"domain_scores_gemma":[0.9959403,0.0021413148,0.00040739818,0.0006634015,0.0007692195,0.000078461286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003564319,0.0018633414,0.0010652036,0.0043864204,0.00058437634,0.0029258553,0.0012162147,0.0012118564,0.0028057257],"category_scores_gemma":[0.007913193,0.0007928235,0.0015443277,0.003157006,0.00065706694,0.0034150132,0.0016177517,0.001125921,0.0005592875],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000057183235,0.00019640729,0.0045966324,0.0002883743,0.00017013478,0.00009727577,0.00013409034,0.84113675,0.0024034944,0.04195872,0.0011756285,0.10778527],"study_design_scores_gemma":[0.000010365358,0.00010218873,0.0016920477,0.00008660958,0.00006690053,0.00007261964,0.00014185524,0.9667566,0.0026029276,0.021431373,0.006989382,0.000047135625],"about_ca_topic_score_codex":0.0117237875,"about_ca_topic_score_gemma":0.013299106,"teacher_disagreement_score":0.0117237875,"about_ca_system_score_codex":0.0026980708,"about_ca_system_score_gemma":0.0033700028,"threshold_uncertainty_score":0.023311079},"labels":[],"label_agreement":null},{"id":"W4396899696","doi":"10.56238/seveniengineering-005","title":"Good sustainability practices applied in buildings that use BIM technology","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact; Adidas (Canada)","funders":"","keywords":"Building information modeling; Work (physics); Sustainability; Multidisciplinary approach; Computer science; Relevance (law); Anticipation (artificial intelligence); Risk analysis (engineering); Sustainable development; Construction engineering; Engineering; Business; Operations management","score_opus":0.012137302809965458,"score_gpt":0.24615657311394878,"score_spread":0.23401927030398334,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4396899696","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017352557,0.16583477,0.39746606,0.023824852,0.0011424728,0.0011291195,0.0013097903,0.00080045266,0.3911399],"genre_scores_gemma":[0.19789474,0.16065636,0.6104723,0.0038366895,0.00047233352,0.0014125884,0.0018196495,0.00041345632,0.023021815],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9865346,0.0055055227,0.0016960906,0.0008384023,0.0051333173,0.00029216477],"domain_scores_gemma":[0.99029887,0.0049296883,0.00085452537,0.0012105764,0.0026244458,0.00008177608],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011082707,0.0010377434,0.00077894656,0.013317276,0.0023363715,0.006325969,0.0016895658,0.0019862934,0.0038749767],"category_scores_gemma":[0.01919152,0.0006117442,0.00087928574,0.020443406,0.0053115273,0.007103202,0.0028277002,0.001885838,0.0022520048],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002003762,0.00010609256,0.0038927682,0.008521399,0.00007131132,0.00043713898,0.011885819,0.0035248478,0.0025725258,0.38838232,0.01576138,0.5648243],"study_design_scores_gemma":[0.0000066981875,0.000040245082,0.007983881,0.009057333,0.00006321913,0.00090716576,0.008410224,0.0007361573,0.0037068808,0.093962625,0.8750523,0.00007326173],"about_ca_topic_score_codex":0.00603424,"about_ca_topic_score_gemma":0.009183522,"teacher_disagreement_score":0.013317276,"about_ca_system_score_codex":0.004911354,"about_ca_system_score_gemma":0.006509454,"threshold_uncertainty_score":0.05861169},"labels":[],"label_agreement":null},{"id":"W4398252220","doi":"10.1061/jcemd4.coeng-14527","title":"Determining Factors Influencing BIM Adoption: A Competency-Driven Approach","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Process management; Building information modeling; Business; Knowledge management; Systems engineering; Computer science; Engineering; Operations management","score_opus":0.006709873202250552,"score_gpt":0.18520324016720616,"score_spread":0.1784933669649556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398252220","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99358857,0.000035679815,0.0037034012,0.00018426792,0.0000023303535,0.00035927212,0.00012324881,0.00000798285,0.0019952103],"genre_scores_gemma":[0.99372077,0.000035222438,0.0056096753,0.00003637179,0.0000013936312,0.00022433426,0.00015348992,0.0000034114005,0.00021538697],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99508166,0.0021497624,0.0003256843,0.00039221536,0.0014275098,0.0006231094],"domain_scores_gemma":[0.98119843,0.010303631,0.0024659266,0.00060107687,0.004430138,0.0010007529],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0075093545,0.00047156285,0.00035101184,0.0059429165,0.0013674052,0.0021546306,0.0010507266,0.00059710315,0.001571576],"category_scores_gemma":[0.02571566,0.0002994627,0.00077197264,0.003122538,0.0011836557,0.0015271599,0.0023087854,0.0010354152,0.00019936914],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004530412,0.00048354774,0.95770097,0.00008890416,0.000055520897,0.00015552877,0.010965715,0.0011426865,0.0005281902,0.0018888765,0.0002567155,0.026687916],"study_design_scores_gemma":[0.00001899637,0.00028365917,0.919678,0.000168151,0.000050077128,0.00019762511,0.04350204,0.030470405,0.0011539883,0.0026422108,0.0017827987,0.000052124342],"about_ca_topic_score_codex":0.05626733,"about_ca_topic_score_gemma":0.07360632,"teacher_disagreement_score":0.05626733,"about_ca_system_score_codex":0.006181675,"about_ca_system_score_gemma":0.0094941985,"threshold_uncertainty_score":0.11187965},"labels":[],"label_agreement":null},{"id":"W4398775382","doi":"10.1061/jcemd4.coeng-14227","title":"Sustainability in Prefabricated Construction: Enhancing Multicriteria Analysis and Prediction Using Machine Learning","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Sustainability; Computer science; Machine learning; Engineering; Artificial intelligence; Architectural engineering; Construction engineering; Ecology","score_opus":0.003752955277940804,"score_gpt":0.20285573293684428,"score_spread":0.19910277765890347,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4398775382","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4887808,0.00030348013,0.50593686,0.00035546822,0.000033811404,0.00016966333,0.00018956442,0.0005001839,0.0037301222],"genre_scores_gemma":[0.93449163,0.0001285454,0.064652726,0.000021851582,0.000010033803,0.0000643194,0.00018012279,0.000026767448,0.0004240209],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99837565,0.00063933973,0.00009836154,0.0003105972,0.00042239946,0.0001536386],"domain_scores_gemma":[0.9970927,0.0014996687,0.0005356589,0.0002226373,0.0005579786,0.00009131564],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003466412,0.0010275318,0.0009765625,0.0031099322,0.0005316928,0.0016984951,0.0008090213,0.0009257236,0.001177432],"category_scores_gemma":[0.006778783,0.00047758906,0.0014728856,0.002182001,0.00057350897,0.0019899113,0.0013900601,0.0009942316,0.00018548396],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000688001,0.00016325265,0.04056134,0.00007333084,0.000099347846,0.00010593613,0.0001754175,0.8821381,0.0013818857,0.0021142024,0.00031510956,0.07280328],"study_design_scores_gemma":[0.0000025926847,0.0000355007,0.00546662,0.000012638804,0.000012799671,0.000014288627,0.00007283223,0.9919978,0.00045740922,0.0017081632,0.00020760161,0.000011761409],"about_ca_topic_score_codex":0.011885927,"about_ca_topic_score_gemma":0.014117342,"teacher_disagreement_score":0.011885927,"about_ca_system_score_codex":0.00139744,"about_ca_system_score_gemma":0.001712868,"threshold_uncertainty_score":0.02363354},"labels":[],"label_agreement":null},{"id":"W4399043571","doi":"10.22260/isarc2024/0174","title":"Analysis of openBIM Adoptions and Implementations: Global Perspectives and Canadian Industry Adoption","year":2024,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Implementation; Computer science; Telecommunications; Data science; Business; Software engineering","score_opus":0.009728157840064202,"score_gpt":0.24550205306183906,"score_spread":0.23577389522177486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399043571","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.881768,0.0015431817,0.0015797275,0.004233769,0.00003660419,0.00022120799,0.0014056714,0.00009866595,0.10911322],"genre_scores_gemma":[0.9891094,0.0019716227,0.0022803457,0.00027353398,0.0000064354977,0.00007387794,0.0009108318,0.000049022157,0.0053250166],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9866583,0.0013973172,0.00048120393,0.0010666624,0.007157781,0.0032387376],"domain_scores_gemma":[0.98243195,0.0029242937,0.0018091456,0.00095277006,0.010304942,0.0015768966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00976138,0.00056052743,0.000499526,0.009623713,0.0070756683,0.008388664,0.0020414102,0.00088939455,0.0033325679],"category_scores_gemma":[0.02249329,0.00043363724,0.0006633938,0.028423574,0.0047150045,0.003670873,0.006530529,0.0016486243,0.00026254804],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021518451,0.00016638615,0.40084636,0.0008186085,0.000098668235,0.0008481393,0.24320427,0.0014864606,0.0020410374,0.09808643,0.009260484,0.24292795],"study_design_scores_gemma":[0.000019056186,0.00011633753,0.6610892,0.00066761614,0.00010140822,0.00028948442,0.21500812,0.0016884713,0.0011679147,0.0025305196,0.11717027,0.00015162265],"about_ca_topic_score_codex":0.95932,"about_ca_topic_score_gemma":0.9665737,"teacher_disagreement_score":0.07914398,"about_ca_system_score_codex":0.07914398,"about_ca_system_score_gemma":0.08784861,"threshold_uncertainty_score":0.57423246},"labels":[],"label_agreement":null},{"id":"W4399043768","doi":"10.22260/isarc2024/0037","title":"Performance Evaluation of Genetic Algorithm and Particle Swarm Optimization in Off-Site Construction Scheduling","year":2024,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Particle swarm optimization; Computer science; Genetic algorithm; Scheduling (production processes); Algorithm; Multi-swarm optimization; Metaheuristic; Mathematical optimization; Mathematics; Machine learning","score_opus":0.010348799172307572,"score_gpt":0.21619183396070887,"score_spread":0.2058430347884013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399043768","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9157929,0.0007813802,0.069027044,0.00039681385,0.00014813157,0.0001504844,0.00011865962,0.0005692648,0.013015332],"genre_scores_gemma":[0.977539,0.00014925814,0.021231834,0.000032629607,0.000009329007,0.000041013398,0.000117474825,0.00003115618,0.0008484055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989153,0.0005520109,0.00005217303,0.00011863168,0.00022152583,0.00014043045],"domain_scores_gemma":[0.99722666,0.0019047254,0.00015780077,0.000121494755,0.0004757347,0.0001136009],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002296219,0.0008865302,0.001018107,0.0010839269,0.00045008876,0.0011302996,0.00068792654,0.0011435008,0.0008677048],"category_scores_gemma":[0.0048339656,0.00025525625,0.0004963883,0.00085152296,0.00044879556,0.0006698958,0.0004066758,0.00054732664,0.00014870697],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030023197,0.0002208159,0.002799949,0.00005280491,0.00005410232,0.00003714046,0.000033900727,0.9669328,0.0009185618,0.0006407814,0.0003681943,0.027640784],"study_design_scores_gemma":[0.000019219386,0.00014826153,0.0009639566,0.0000032390276,0.000011147594,0.000005734099,0.000021320331,0.9980531,0.00056515326,0.00009338083,0.00011128649,0.0000042105717],"about_ca_topic_score_codex":0.032374665,"about_ca_topic_score_gemma":0.013223849,"teacher_disagreement_score":0.032374665,"about_ca_system_score_codex":0.0014465703,"about_ca_system_score_gemma":0.0017459474,"threshold_uncertainty_score":0.06437248},"labels":[],"label_agreement":null},{"id":"W4399102646","doi":"10.1201/9781032665443-70","title":"Performance-Based Seismic Design for Unreinforced Masonry: A Literature Review","year":2024,"lang":"en","type":"review","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Unreinforced masonry building; Masonry; Geology; Civil engineering; Architectural engineering; Engineering","score_opus":0.03205393249848904,"score_gpt":0.27328321108812764,"score_spread":0.2412292785896386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399102646","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0018158638,0.98849106,0.0045160977,0.00036942083,0.00024041723,0.00002644959,0.00007487368,0.000037020927,0.0044288775],"genre_scores_gemma":[0.008706775,0.9860261,0.003957277,0.00012008996,0.00018913858,0.000020127582,0.00010148121,0.000011530587,0.0008675291],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993864,0.00010229123,0.00010933381,0.00010927981,0.00026315558,0.000029414394],"domain_scores_gemma":[0.9974964,0.0015807372,0.00023865972,0.00005827062,0.0005774324,0.000048495076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00091175496,0.0011790735,0.0009937505,0.0037346128,0.00037229608,0.0014582598,0.0012174033,0.0012429955,0.0041345274],"category_scores_gemma":[0.0026507478,0.0005094276,0.000781712,0.005295921,0.00048513268,0.0014545269,0.00055967254,0.0007093979,0.00097469595],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005277289,0.00014052051,0.0009710286,0.042982016,0.00009757309,0.00023401211,0.0003595833,0.005256432,0.0017008652,0.010756977,0.014121999,0.9233262],"study_design_scores_gemma":[0.000016721811,0.000358924,0.004709231,0.03737866,0.0005883637,0.0017331068,0.0010306565,0.00478251,0.002565846,0.008582696,0.93816143,0.00009179298],"about_ca_topic_score_codex":0.0025881147,"about_ca_topic_score_gemma":0.0027169266,"teacher_disagreement_score":0.0041345274,"about_ca_system_score_codex":0.0005639185,"about_ca_system_score_gemma":0.0019886883,"threshold_uncertainty_score":0.013831377},"labels":[],"label_agreement":null},{"id":"W4399172511","doi":"10.7202/1111451ar","title":"Translations in Concrete","year":2023,"lang":"en","type":"article","venue":"Journal of the Society for the Study of Architecture in Canada","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Materials science","score_opus":0.00863143895776166,"score_gpt":0.2058758164551283,"score_spread":0.19724437749736665,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399172511","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.036670312,0.020795774,0.010734705,0.009164868,0.002197367,0.00016826094,0.007059768,0.00038811844,0.9128208],"genre_scores_gemma":[0.4249324,0.010329752,0.009086964,0.00050616165,0.00025449877,0.00009529407,0.0021091315,0.00048596683,0.55219984],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992724,0.00015195928,0.000028544133,0.00015585274,0.0002679759,0.00012313972],"domain_scores_gemma":[0.998971,0.0002254165,0.000091066344,0.0001431429,0.00046417638,0.00010515342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005009541,0.0007491676,0.00020793901,0.00250203,0.004829243,0.003589782,0.0007797442,0.0007540272,0.064949974],"category_scores_gemma":[0.003969028,0.00030527616,0.00023746745,0.0072865076,0.005509319,0.0034366387,0.002209588,0.001247672,0.0059995246],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011746165,0.00002009093,0.0044756774,0.00046422303,0.000018597577,0.0006310182,0.11013054,0.0007375381,0.0014258286,0.4586846,0.21878108,0.20451336],"study_design_scores_gemma":[0.000004950614,0.000010022618,0.009025714,0.0002217014,0.0000063761304,0.00011993016,0.012156955,0.00012268843,0.00052343815,0.008383925,0.96940863,0.000015776002],"about_ca_topic_score_codex":0.7207855,"about_ca_topic_score_gemma":0.87256056,"teacher_disagreement_score":0.7207855,"about_ca_system_score_codex":0.0184443,"about_ca_system_score_gemma":0.0132043315,"threshold_uncertainty_score":0.5617177},"labels":[],"label_agreement":null},{"id":"W4399178667","doi":"10.3389/fbuil.2024.1380106","title":"Modeling and categorizing standardized artifacts for scheduling occupancy on building construction sites","year":2024,"lang":"en","type":"article","venue":"Frontiers in Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Occupancy; Schedule; Plan (archaeology); Scheduling (production processes); Process (computing); Reuse; Construction management; Space (punctuation); Computer science; Transport engineering; Operations research; Work (physics); Engineering; Construction engineering; Systems engineering; Civil engineering; Operations management","score_opus":0.012199074836528542,"score_gpt":0.2227024203751494,"score_spread":0.21050334553862085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399178667","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.078215346,0.00010479086,0.9103218,0.00008252369,0.000036792524,0.00074063835,0.00080748036,0.001640617,0.008050007],"genre_scores_gemma":[0.29570803,0.00024363703,0.6991772,0.000015076846,0.00001070099,0.000868378,0.0020785036,0.00021430901,0.0016841227],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998387,0.0005809695,0.0002073084,0.00018808637,0.0005203389,0.00011635758],"domain_scores_gemma":[0.9965899,0.0013345074,0.00051807106,0.00069859566,0.0007626627,0.000096193915],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002225762,0.00083967834,0.00033664136,0.0020669538,0.00045458798,0.0024584315,0.0012832597,0.00049920945,0.0016644718],"category_scores_gemma":[0.0057019535,0.0005214598,0.0010348033,0.0019045323,0.0006705505,0.0012206942,0.00087995036,0.0005548978,0.00037095393],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001208643,0.00028124877,0.014386493,0.0003126365,0.00005537076,0.00025698682,0.0012753367,0.8135399,0.0057271263,0.06474926,0.001494164,0.097800575],"study_design_scores_gemma":[0.000026938129,0.00019849249,0.0051627113,0.00009957851,0.000056053683,0.00010566931,0.00064203166,0.9528528,0.008391824,0.0105883675,0.021826,0.000049567596],"about_ca_topic_score_codex":0.011191974,"about_ca_topic_score_gemma":0.013815094,"teacher_disagreement_score":0.011191974,"about_ca_system_score_codex":0.0015577726,"about_ca_system_score_gemma":0.0022638987,"threshold_uncertainty_score":0.022253633},"labels":[],"label_agreement":null},{"id":"W4399204586","doi":"10.36680/j.itcon.2024.018","title":"A cloud-based integration of Building Information Modeling and Virtual Reality through game engine to facilitate the design of Age-in-Place homes at the conceptual stage","year":2024,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Ottawa","funders":"","keywords":"Game engine; Building information modeling; Virtual reality; Conceptual model; Cloud computing; Conceptual design; Engineering; Architectural engineering; Stage (stratigraphy); Computer science; Human–computer interaction; Systems engineering; Operations management; Database; Operating system; Geology","score_opus":0.021914974288020417,"score_gpt":0.24152913631094464,"score_spread":0.21961416202292422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399204586","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.083657965,0.00030956135,0.8793226,0.00042183432,0.00013736098,0.0006770798,0.0011536643,0.011467718,0.022852229],"genre_scores_gemma":[0.583461,0.00037791196,0.4075004,0.00014163174,0.000017173572,0.00035008887,0.0017423012,0.00042624283,0.005983221],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996567,0.00008063173,0.000024521241,0.000052159994,0.0001399206,0.00004604627],"domain_scores_gemma":[0.9996915,0.000075962045,0.000019805284,0.0000839815,0.000074062256,0.000054805474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004133685,0.000574235,0.00037625356,0.00047695645,0.00034764098,0.0013035783,0.0013244584,0.0004579991,0.00430635],"category_scores_gemma":[0.00090392545,0.0002823257,0.0008249902,0.00045037075,0.00029523647,0.0011907814,0.0016326514,0.00057921495,0.0008981858],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0013897413,0.0021389902,0.014853362,0.0008740373,0.00040906997,0.0017253725,0.0023491855,0.39750785,0.09945717,0.06647103,0.033220377,0.3796038],"study_design_scores_gemma":[0.000083977015,0.00018433541,0.003193195,0.000046792073,0.00006814332,0.0002636394,0.00018270288,0.9461487,0.012446137,0.005521089,0.03179599,0.00006532202],"about_ca_topic_score_codex":0.010363824,"about_ca_topic_score_gemma":0.013068953,"teacher_disagreement_score":0.010363824,"about_ca_system_score_codex":0.00052634685,"about_ca_system_score_gemma":0.0008759658,"threshold_uncertainty_score":0.020606995},"labels":[],"label_agreement":null},{"id":"W4399293667","doi":"10.1080/09537287.2024.2360581","title":"From process-based to technology-driven: a study on functionalities as key elements of collaborative planning methods for construction projects","year":2024,"lang":"en","type":"article","venue":"Production Planning & Control","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale de la Recherche","keywords":"Process (computing); Process management; Key (lock); Knowledge management; Computer science; Project planning; Control (management); Project management; Engineering; Systems engineering","score_opus":0.022065475977545608,"score_gpt":0.34755955177335573,"score_spread":0.32549407579581013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399293667","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9381319,0.00067933346,0.039158795,0.0007345634,0.000012661457,0.0003470563,0.000022493185,0.00001751988,0.020895602],"genre_scores_gemma":[0.9892196,0.00038071215,0.009554965,0.000049078048,0.0000032779274,0.00013527306,0.00001138167,0.000010290978,0.0006353559],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.981124,0.014711582,0.0005641828,0.0007500012,0.0022185245,0.0006317987],"domain_scores_gemma":[0.9690953,0.02634689,0.0016998687,0.00069858605,0.0015683867,0.0005910543],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.017808443,0.0004841999,0.0002928173,0.0027355056,0.0025285557,0.0051990934,0.00092282007,0.00091624336,0.0012095954],"category_scores_gemma":[0.021626735,0.00045905114,0.00042234457,0.0022088364,0.004366321,0.007880217,0.0031867188,0.0012368431,0.00013331127],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016001519,0.0005426453,0.04779247,0.0011103558,0.000049532773,0.0007927501,0.75088084,0.0010917917,0.0039648865,0.050021708,0.00035248997,0.1432405],"study_design_scores_gemma":[0.000037531026,0.00083251967,0.07481253,0.0017453182,0.00011796181,0.001258916,0.85077435,0.009592904,0.004349604,0.018995523,0.037375905,0.000106945714],"about_ca_topic_score_codex":0.0022626487,"about_ca_topic_score_gemma":0.0035296082,"teacher_disagreement_score":0.017808443,"about_ca_system_score_codex":0.0026823399,"about_ca_system_score_gemma":0.00394018,"threshold_uncertainty_score":0.09418112},"labels":[],"label_agreement":null},{"id":"W4399301147","doi":"10.3390/su16114718","title":"An Integrated Building Information Modeling and Life-Cycle Assessment Approach to Facilitate Design Decisions on Sustainable Building Projects in Canada","year":2024,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":20,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Building information modeling; Life-cycle assessment; Building design; Sustainable design; Process management; Sustainability; Systems engineering; Architectural engineering; Construction engineering; Environmental resource management; Engineering; Computer science; Environmental planning; Business; Management science; Environmental science; Operations management; Economics","score_opus":0.02134393565045404,"score_gpt":0.2531024576235366,"score_spread":0.23175852197308258,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399301147","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42214915,0.00081408455,0.4576666,0.002426187,0.00004018971,0.001308197,0.0024534732,0.0014311371,0.11171102],"genre_scores_gemma":[0.72066444,0.00043566854,0.26847345,0.00006547159,0.000002895996,0.0002964796,0.00085114455,0.00006244919,0.009148022],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9986732,0.00040875323,0.000063474254,0.0001372352,0.0005213903,0.00019599198],"domain_scores_gemma":[0.999156,0.00019487648,0.000049251063,0.00007167081,0.0004507585,0.00007754002],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001577797,0.0007156736,0.00042563234,0.0022412979,0.0024027638,0.0035277507,0.0017077675,0.0005789701,0.004134357],"category_scores_gemma":[0.002620085,0.0005381315,0.00059836276,0.0028197223,0.0007651421,0.0014074744,0.0018987238,0.0006110257,0.00033360333],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021266058,0.00039081788,0.020578764,0.00030290926,0.0000974561,0.00041886175,0.0022140655,0.69194907,0.0050204867,0.061152868,0.004268588,0.21339335],"study_design_scores_gemma":[0.00002642396,0.000046510362,0.005069024,0.0000749255,0.000056583,0.00003914724,0.001955184,0.9642708,0.0025284127,0.0062775942,0.019601101,0.000054329626],"about_ca_topic_score_codex":0.90703195,"about_ca_topic_score_gemma":0.9496953,"teacher_disagreement_score":0.09296805,"about_ca_system_score_codex":0.028109401,"about_ca_system_score_gemma":0.04047789,"threshold_uncertainty_score":0.20394892},"labels":[],"label_agreement":null},{"id":"W4399398557","doi":"10.46254/an14.20240131","title":"Duration Estimation of Steel Framing Activities Using an Artificial Intelligent Algorithm and Top Risk Scores for High-Rise Buildings","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario Tech University","funders":"","keywords":"Framing (construction); Computer science; Top-down and bottom-up design; Algorithm; Artificial intelligence; Engineering; Structural engineering","score_opus":0.01509492028766787,"score_gpt":0.2526136799656671,"score_spread":0.2375187596779992,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399398557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77332634,0.00016947744,0.2247212,0.000050219893,0.00002149244,0.000030442512,0.00017593867,0.00027723153,0.0012276795],"genre_scores_gemma":[0.96182615,0.00004433613,0.03752088,0.000005497134,0.0000056071544,0.000021605892,0.00017942458,0.000008220309,0.00038823293],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99955803,0.000119133416,0.000050755367,0.00012708611,0.000097273376,0.000047688485],"domain_scores_gemma":[0.99892586,0.00049188774,0.00019529535,0.000060206366,0.0002643339,0.00006237504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010297912,0.00059157837,0.0004071475,0.001395584,0.00023575696,0.00055442256,0.00037905973,0.0005144417,0.0005651432],"category_scores_gemma":[0.0024083676,0.00024891004,0.00045506444,0.0007369196,0.00014552956,0.0005916503,0.0003361731,0.00035140425,0.00014834145],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00037997778,0.00019462693,0.053727686,0.00008128957,0.00010170987,0.00010692518,0.00012616251,0.78969777,0.0063761687,0.00058107637,0.00030787976,0.14831872],"study_design_scores_gemma":[0.000004053673,0.0000531112,0.01128118,0.0000056381477,0.000013916157,0.000021472417,0.000029871291,0.9869696,0.001282308,0.00021328178,0.00011579728,0.000009812981],"about_ca_topic_score_codex":0.0064967955,"about_ca_topic_score_gemma":0.0058374363,"teacher_disagreement_score":0.0064967955,"about_ca_system_score_codex":0.000552331,"about_ca_system_score_gemma":0.0005052786,"threshold_uncertainty_score":0.012917936},"labels":[],"label_agreement":null},{"id":"W4399422117","doi":"10.15554/pcij68.2-ps1","title":"Project Spotlight: 11 Hoyt makes complex facade panel design look easy","year":2023,"lang":"en","type":"article","venue":"PCI Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facade; Panel data; Architectural engineering; Engineering; Computer science; Civil engineering; Economics; Econometrics","score_opus":0.10319363257269198,"score_gpt":0.265454781484379,"score_spread":0.16226114891168703,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399422117","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24878517,0.00059617194,0.23031923,0.0015460314,0.0012333475,0.0010105976,0.004968547,0.015944416,0.49559644],"genre_scores_gemma":[0.41084585,0.0006253592,0.17250161,0.00031276475,0.00018264557,0.0005296165,0.006041951,0.0047185128,0.40424168],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996008,0.000054092474,0.0000062088193,0.000038752827,0.00022121282,0.00007895751],"domain_scores_gemma":[0.99949944,0.000041321775,0.000014749054,0.00007079729,0.00019209161,0.00018161943],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007906782,0.0006503202,0.0001950957,0.0003097789,0.00051583257,0.00082151504,0.00048224602,0.00062240043,0.08641634],"category_scores_gemma":[0.0006592598,0.00038995835,0.00023163296,0.00028636114,0.00026601157,0.00075896364,0.0014623113,0.0007975845,0.011329835],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000871886,0.00044582595,0.0038728283,0.00033066038,0.000016330418,0.00046769096,0.0007941016,0.0092623625,0.09497885,0.010694592,0.3188954,0.5593695],"study_design_scores_gemma":[0.00021763872,0.0011381018,0.019548327,0.00009106911,0.000017998345,0.00076937757,0.00038722315,0.011348455,0.028015386,0.0020248836,0.93639106,0.000050390314],"about_ca_topic_score_codex":0.005094438,"about_ca_topic_score_gemma":0.022915456,"teacher_disagreement_score":0.08641634,"about_ca_system_score_codex":0.00042876188,"about_ca_system_score_gemma":0.0012148549,"threshold_uncertainty_score":0.2890914},"labels":[],"label_agreement":null},{"id":"W4399931390","doi":"10.1016/j.jcsr.2024.108850","title":"Novel steel connection for modular houses in indigenous communities: An experimental study","year":2024,"lang":"en","type":"article","venue":"Journal of Constructional Steel Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Indigenous; Connection (principal bundle); Modular design; Structural engineering; Engineering; Architectural engineering; Forensic engineering; Civil engineering; Computer science","score_opus":0.08295323201204334,"score_gpt":0.36855344861338496,"score_spread":0.2856002166013416,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4399931390","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9988807,0.0000034449793,0.0002292823,0.000004338827,0.0000020652506,0.000040576855,0.000009389911,0.000002316302,0.0008279213],"genre_scores_gemma":[0.99552935,0.000022704404,0.0015285503,0.0000084621415,0.0000038468042,0.00008369248,0.000027131251,0.0000048417887,0.0027913437],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993056,0.00016325858,0.000022299388,0.00016527268,0.00018829641,0.0001552257],"domain_scores_gemma":[0.99918073,0.00020854005,0.00008443443,0.00012322358,0.00021223252,0.00019082255],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00092090917,0.00069817546,0.00046380897,0.00076576206,0.003038667,0.0007656267,0.0011792532,0.00091791066,0.006708872],"category_scores_gemma":[0.0020005743,0.00039596285,0.00042946733,0.00052796834,0.0019830284,0.0008179285,0.001627925,0.00078931445,0.0005649684],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.010816974,0.074311785,0.19654264,0.001331973,0.00023305809,0.012479241,0.23452032,0.006552375,0.31688726,0.009680602,0.0014941907,0.13514967],"study_design_scores_gemma":[0.0005681768,0.08069277,0.54032195,0.00022116926,0.0006091811,0.0033359355,0.28847116,0.013109053,0.05348345,0.0040977416,0.014856079,0.00023330096],"about_ca_topic_score_codex":0.014558033,"about_ca_topic_score_gemma":0.036901515,"teacher_disagreement_score":0.014558033,"about_ca_system_score_codex":0.00092393736,"about_ca_system_score_gemma":0.0013888387,"threshold_uncertainty_score":0.028946638},"labels":[],"label_agreement":null},{"id":"W4400013764","doi":"10.18280/jesa.570316","title":"Comparing the Effectiveness of PERT and CPM Techniques in a House Construction Project: A Case Study","year":2024,"lang":"en","type":"article","venue":"Journal Européen des Systèmes Automatisés","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Computer science; Operations research; Engineering management","score_opus":0.017988036804117844,"score_gpt":0.2614580457719381,"score_spread":0.24347000896782026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400013764","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98297703,0.00023435205,0.012478588,0.00007720081,0.000009544612,0.00048079403,0.000032760505,0.000033990862,0.0036758776],"genre_scores_gemma":[0.9662538,0.00038090252,0.03220298,0.000021208616,0.00000912159,0.00029722144,0.000032665794,0.000013985057,0.00078806677],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.9861059,0.0094691655,0.00063963124,0.00046167165,0.0027122537,0.0006113712],"domain_scores_gemma":[0.9591149,0.031076742,0.0025762825,0.0015799698,0.0048340713,0.00081796426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011913961,0.00052538526,0.0006124714,0.002860847,0.001103877,0.0012792094,0.001013982,0.0010455651,0.0010783585],"category_scores_gemma":[0.029879712,0.00040828844,0.00054318795,0.0025185188,0.0010679826,0.0013372991,0.0013470639,0.00068682665,0.00019424649],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00436956,0.009388901,0.1153402,0.0031399517,0.00034378658,0.006896349,0.024559094,0.05887489,0.027927468,0.011139881,0.0016315152,0.7363884],"study_design_scores_gemma":[0.0011117146,0.08557825,0.3927275,0.001276281,0.001297888,0.011220732,0.09470701,0.2742254,0.097968005,0.0071590617,0.0319726,0.0007556401],"about_ca_topic_score_codex":0.0030230053,"about_ca_topic_score_gemma":0.0063940925,"teacher_disagreement_score":0.011913961,"about_ca_system_score_codex":0.0015204772,"about_ca_system_score_gemma":0.0019267519,"threshold_uncertainty_score":0.06300777},"labels":[],"label_agreement":null},{"id":"W4400058454","doi":"10.4236/ojce.2024.142009","title":"An Integrated Building Information Modeling (BIM) and Circular Economy (CE) Model for the Management of Construction and Deconstruction Waste Based on Construction Methods","year":2024,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Deconstruction (building); Building information modeling; Circular economy; Construction engineering; Information model; Architectural engineering; Civil engineering; Engineering; Computer science; Waste management; Operations management; Database","score_opus":0.014173564736179983,"score_gpt":0.258368636831527,"score_spread":0.24419507209534702,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400058454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02274942,0.0003924374,0.9511735,0.0004972267,0.000059231665,0.00011735973,0.00045065055,0.0003990978,0.024161147],"genre_scores_gemma":[0.57533455,0.0012559858,0.4105188,0.00012178227,0.000038603954,0.0006923414,0.0011663764,0.0002092091,0.01066239],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99954396,0.0001400976,0.000029118912,0.00006893902,0.00015695649,0.000060927487],"domain_scores_gemma":[0.99971646,0.00011202624,0.000035599034,0.00003637033,0.000074358875,0.0000250952],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007011634,0.0006779717,0.0005506098,0.0012651471,0.0006418362,0.0019748546,0.0018031946,0.001388877,0.0025542837],"category_scores_gemma":[0.0009524784,0.0004900745,0.0013946807,0.0014899344,0.0007895913,0.0018837381,0.0014590666,0.0008534112,0.00044483744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026553249,0.000050099603,0.00091723975,0.00007863447,0.000024054196,0.00010917565,0.000117098665,0.88861424,0.0010199351,0.092089,0.00078648014,0.016167494],"study_design_scores_gemma":[0.000006843054,0.0000143508205,0.00018339904,0.000021728752,0.000016453358,0.00004220351,0.000042149168,0.9805381,0.00052792317,0.011897011,0.0066972114,0.000012651034],"about_ca_topic_score_codex":0.014010647,"about_ca_topic_score_gemma":0.011367704,"teacher_disagreement_score":0.014010647,"about_ca_system_score_codex":0.0014705894,"about_ca_system_score_gemma":0.0022302214,"threshold_uncertainty_score":0.027858198},"labels":[],"label_agreement":null},{"id":"W4400096285","doi":"10.1007/978-3-031-62578-7_25","title":"On Considering a PLM Platform for Design Change Management in Construction","year":2024,"lang":"en","type":"book-chapter","venue":"IFIP advances in information and communication technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Systems engineering; Computer science; Process management; Engineering; Construction engineering","score_opus":0.021514388264688548,"score_gpt":0.24172842301291142,"score_spread":0.22021403474822288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400096285","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026219187,0.0013154362,0.17242546,0.0129311755,0.0006141392,0.00016382424,0.000068602625,0.00024792601,0.78601426],"genre_scores_gemma":[0.5108669,0.00239459,0.19379014,0.0019323657,0.00026233908,0.0003209143,0.00017346848,0.00027393916,0.28998536],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99924916,0.00029794447,0.000017725848,0.00008147314,0.0002415736,0.000112062655],"domain_scores_gemma":[0.9996735,0.00015162282,0.000019196088,0.00004943741,0.000060494633,0.000045731245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014729797,0.00049502443,0.00025812452,0.0007640007,0.0023902194,0.006977821,0.001473839,0.002549725,0.013259495],"category_scores_gemma":[0.00169985,0.00031636603,0.00041879452,0.0009257363,0.0025913834,0.0076187076,0.003946155,0.0018532886,0.0016603044],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013350073,0.000027401087,0.00018774651,0.00006199938,0.00000342153,0.00026595825,0.0014101247,0.0061299284,0.0006623072,0.93907166,0.005589912,0.046576083],"study_design_scores_gemma":[0.000011984649,0.00010434397,0.00082995446,0.0003480847,0.000015385776,0.00038357882,0.005951766,0.032446362,0.0018314187,0.5141105,0.44393203,0.000034689117],"about_ca_topic_score_codex":0.004661062,"about_ca_topic_score_gemma":0.008318952,"teacher_disagreement_score":0.013259495,"about_ca_system_score_codex":0.0023447312,"about_ca_system_score_gemma":0.0021587312,"threshold_uncertainty_score":0.04435742},"labels":[],"label_agreement":null},{"id":"W4400135921","doi":"10.18280/ijsse.140327","title":"Assembly Algorithms for Seismic Vulnerability Estimation in Confined Masonry Dwellings","year":2024,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Masonry; Vulnerability (computing); Estimation; Computer science; Vulnerability assessment; Algorithm; Civil engineering; Forensic engineering; Engineering; Computer security; Systems engineering; Medicine","score_opus":0.007701791264262333,"score_gpt":0.24112411619773697,"score_spread":0.23342232493347465,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400135921","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18687654,0.00079663866,0.80813015,0.0001656479,0.000053634027,0.00010325085,0.0003575268,0.0022172346,0.0012994744],"genre_scores_gemma":[0.75840837,0.00032693773,0.23704836,0.00008756423,0.000053314085,0.00018063292,0.002135861,0.00017411172,0.0015848659],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988452,0.00046874408,0.00008219723,0.00024975018,0.00019754737,0.00015659224],"domain_scores_gemma":[0.99690884,0.0018172006,0.0003551756,0.0002423284,0.00056660746,0.00010981024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004207615,0.0013206154,0.0013137613,0.0022283113,0.0005779801,0.0009161098,0.0013745805,0.0008709863,0.0012037897],"category_scores_gemma":[0.008613959,0.000622636,0.0014298067,0.0012449091,0.00047234804,0.001080223,0.0013786941,0.001394302,0.0010431514],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032585004,0.00013730688,0.02698191,0.0000908916,0.00022715631,0.00013070503,0.00020902326,0.7253121,0.0023573027,0.0021522886,0.001946904,0.24012856],"study_design_scores_gemma":[0.00000593172,0.000039099097,0.0027350213,0.000013716241,0.000020441506,0.000027943477,0.00003462766,0.99414647,0.0007202441,0.0017001537,0.00054862717,0.000007612471],"about_ca_topic_score_codex":0.007785272,"about_ca_topic_score_gemma":0.0066205435,"teacher_disagreement_score":0.007785272,"about_ca_system_score_codex":0.0006417891,"about_ca_system_score_gemma":0.00090583175,"threshold_uncertainty_score":0.022252262},"labels":[],"label_agreement":null},{"id":"W4400184649","doi":"10.1080/23744731.2024.2363104","title":"An ontology for automated fault detection &amp; diagnostics of HVAC using BIM and machine learning concepts","year":2024,"lang":"en","type":"article","venue":"Science and Technology for the Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"HVAC; Ontology; Fault (geology); Fault detection and isolation; Computer science; Building information modeling; Artificial intelligence; Machine learning; Systems engineering; Engineering; Mechanical engineering; Operations management","score_opus":0.01485210876768663,"score_gpt":0.26679279868951955,"score_spread":0.25194068992183294,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400184649","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0137622915,0.0004067284,0.96183693,0.0013435888,0.000112663714,0.00060205074,0.0030325893,0.0023215164,0.016581615],"genre_scores_gemma":[0.11147889,0.00092538877,0.8760445,0.00039187123,0.000041980267,0.000626244,0.0063501764,0.00021979856,0.003921182],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975419,0.0005092834,0.0005263294,0.0003614478,0.0008796314,0.00018146508],"domain_scores_gemma":[0.99846184,0.00051942095,0.0002058318,0.00032696736,0.00037647475,0.00010945812],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002184386,0.00061111397,0.00052110606,0.0039992104,0.0013187263,0.003090378,0.0013230571,0.0011763788,0.0019820132],"category_scores_gemma":[0.003759144,0.0005108042,0.001681161,0.0032965576,0.0014800958,0.006111292,0.0027865309,0.0014414315,0.00061504176],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010844202,0.00042592667,0.00738059,0.0011757959,0.000118765776,0.0012981874,0.005773534,0.02540203,0.014872886,0.622418,0.021672681,0.29935318],"study_design_scores_gemma":[0.000054967928,0.000082140315,0.007387276,0.0012954202,0.00021701813,0.0021583722,0.003094799,0.1703748,0.015099278,0.20235135,0.5977147,0.00016988035],"about_ca_topic_score_codex":0.01885364,"about_ca_topic_score_gemma":0.016765317,"teacher_disagreement_score":0.01885364,"about_ca_system_score_codex":0.0022852328,"about_ca_system_score_gemma":0.004897519,"threshold_uncertainty_score":0.037487805},"labels":[],"label_agreement":null},{"id":"W4400216602","doi":"10.54254/2755-2721/70/20240977","title":"Aligning building information modeling and prefabricated construction with sustainable development goals: A framework for sustainable urbanization","year":2024,"lang":"en","type":"article","venue":"Applied and Computational Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Sustainable development; Urbanization; Construction engineering; Building information modeling; Architectural engineering; Environmental planning; Computer science; Business; Civil engineering; Engineering; Environmental science; Political science; Operations management; Economic growth; Economics","score_opus":0.003513634372817561,"score_gpt":0.17994127619075745,"score_spread":0.17642764181793988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400216602","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019547949,0.0055576144,0.7877749,0.03114862,0.00033538157,0.0002635389,0.00016269548,0.0002734921,0.15493587],"genre_scores_gemma":[0.56874025,0.005911633,0.4143539,0.0011584982,0.00014960745,0.0005541955,0.00032307522,0.00012512779,0.0086837225],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9951079,0.003004733,0.00022109688,0.00033706432,0.0009414139,0.00038776908],"domain_scores_gemma":[0.9977399,0.00088737806,0.00028282084,0.0003973315,0.00046228472,0.00023022026],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007845055,0.0011039785,0.0006403527,0.0040253485,0.0026434236,0.00867503,0.0027505844,0.0029240672,0.0021958402],"category_scores_gemma":[0.0042818035,0.0005773456,0.0009950048,0.004282759,0.014260542,0.009924155,0.009746417,0.0037385395,0.00047111802],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000024160122,0.000020035875,0.0002762198,0.00006522036,0.000006698287,0.000061705316,0.0010831546,0.007141485,0.00013562222,0.9803791,0.00052085385,0.010307495],"study_design_scores_gemma":[0.000005151545,0.000021009575,0.0005000315,0.00047994402,0.000013274211,0.00009613267,0.004592626,0.018590845,0.0005630537,0.87944746,0.0956597,0.000030791878],"about_ca_topic_score_codex":0.011390276,"about_ca_topic_score_gemma":0.011838642,"teacher_disagreement_score":0.011390276,"about_ca_system_score_codex":0.0065404302,"about_ca_system_score_gemma":0.010602459,"threshold_uncertainty_score":0.047454357},"labels":[],"label_agreement":null},{"id":"W4400235025","doi":"10.11159/iccste24.171","title":"Life Cycle Analysis of Light Weight Artificial Aggregates for Sustainable Construction","year":2024,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.008083448909523405,"score_gpt":0.2096009281644817,"score_spread":0.2015174792549583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235025","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9720296,0.000608286,0.023901457,0.000031918444,0.000007353006,0.00012280972,0.0006108601,0.00003727682,0.0026503864],"genre_scores_gemma":[0.9935135,0.000302435,0.005106391,0.000005198806,0.000001056564,0.000081611324,0.0003971047,0.0000063522507,0.0005864089],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99970514,0.000078967256,0.000016268299,0.000037556427,0.00012740666,0.000034546436],"domain_scores_gemma":[0.9996705,0.00014346489,0.00005969509,0.000024592471,0.00008876637,0.000012970141],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010276247,0.0004484201,0.00035783745,0.0006654321,0.00023321233,0.00063846656,0.00029469375,0.00033733645,0.00082135375],"category_scores_gemma":[0.00078502006,0.00013245535,0.0006989654,0.00062601815,0.0002015719,0.00040607594,0.00026385518,0.00021927766,0.00013420127],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004690561,0.00028296997,0.016772522,0.00031077638,0.000078069555,0.0001371251,0.00007484084,0.8257389,0.11323586,0.0030702702,0.0001823385,0.03964733],"study_design_scores_gemma":[0.000023617322,0.0016826612,0.01678638,0.000027461578,0.00010476571,0.00004898096,0.00016250032,0.87587994,0.09966618,0.0024925023,0.0030897285,0.000035302855],"about_ca_topic_score_codex":0.0037598338,"about_ca_topic_score_gemma":0.004861857,"teacher_disagreement_score":0.0037598338,"about_ca_system_score_codex":0.001385063,"about_ca_system_score_gemma":0.00077082,"threshold_uncertainty_score":0.010049403},"labels":[],"label_agreement":null},{"id":"W4400235038","doi":"10.11159/iccste24.145","title":"Integration of 4D BIM, PtD and databases to improve OHS and knowledge management in construction","year":2024,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Database; Building information modeling; Construction engineering; Engineering; Operations management","score_opus":0.013557192874358815,"score_gpt":0.23329106166221267,"score_spread":0.21973386878785386,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235038","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08918898,0.0012747599,0.8826187,0.0014105112,0.00010198424,0.0005749723,0.00037693296,0.0015966124,0.022856506],"genre_scores_gemma":[0.33014962,0.0006388459,0.6655925,0.00020854353,0.000022237218,0.00045355468,0.0005244242,0.000091404945,0.0023188936],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99312794,0.0029805102,0.00059259764,0.0005907098,0.0024288534,0.00027944642],"domain_scores_gemma":[0.99571407,0.0012652811,0.00050169183,0.0012150134,0.0010859718,0.00021795023],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005445622,0.0005205458,0.0005523649,0.00367929,0.00066485273,0.0042999657,0.0015682979,0.00071734824,0.0016786084],"category_scores_gemma":[0.0070558633,0.00043767077,0.00065070175,0.0039228927,0.00092687353,0.004716285,0.0051942077,0.00070894643,0.00036090042],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013456368,0.0004730549,0.012474695,0.00060986204,0.000116011324,0.00016645565,0.0030931649,0.017605407,0.007086229,0.047848336,0.0029607555,0.9074315],"study_design_scores_gemma":[0.00017008897,0.0019174111,0.06291207,0.0017648872,0.0007937866,0.0016347653,0.018637659,0.39815107,0.044813085,0.17369868,0.29507008,0.00043647608],"about_ca_topic_score_codex":0.0031334965,"about_ca_topic_score_gemma":0.0046076253,"teacher_disagreement_score":0.005445622,"about_ca_system_score_codex":0.0013349742,"about_ca_system_score_gemma":0.004666343,"threshold_uncertainty_score":0.028799534},"labels":[],"label_agreement":null},{"id":"W4400235337","doi":"10.11159/iccste24","title":"Proceedings of the 9th International Conference on Civil, Structural and Transportation Engineering (ICCSTE 2024)","year":2024,"lang":"en","type":"paratext","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Construction engineering; Engineering management; Computer science; Civil engineering; Engineering ethics; Transport engineering","score_opus":0.013032088030389206,"score_gpt":0.21971930163711964,"score_spread":0.20668721360673042,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400235337","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013378808,0.01767479,0.1564134,0.013682463,0.10068351,0.0005924048,0.0075680176,0.0052326573,0.6847739],"genre_scores_gemma":[0.019368505,0.006359745,0.03018351,0.0011297391,0.003539358,0.00023640125,0.013409588,0.0012194016,0.9245538],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99834716,0.00034869564,0.00007868075,0.00014986991,0.0008983504,0.00017732858],"domain_scores_gemma":[0.9962519,0.0003087405,0.00008010063,0.00039001185,0.0021992256,0.00077010173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027075578,0.0011309884,0.0011502359,0.0016445678,0.000818307,0.004356885,0.001282217,0.0017058768,0.18698993],"category_scores_gemma":[0.0025826711,0.00031187042,0.0007109864,0.0013004632,0.0006713994,0.0019813597,0.0027221062,0.002315093,0.11475697],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020544215,0.00019192792,0.0005853675,0.00019442878,0.000022182652,0.00010561599,0.00006246843,0.0008573297,0.0030233932,0.004873194,0.79374176,0.196137],"study_design_scores_gemma":[0.000014829992,0.00007679532,0.0012621023,0.0001028541,0.000018239114,0.00015206375,0.00007005463,0.002789422,0.0018045767,0.0025101637,0.99118465,0.000014297217],"about_ca_topic_score_codex":0.003419134,"about_ca_topic_score_gemma":0.007271994,"teacher_disagreement_score":0.18698993,"about_ca_system_score_codex":0.00077387877,"about_ca_system_score_gemma":0.002405488,"threshold_uncertainty_score":0.62554365},"labels":[],"label_agreement":null},{"id":"W4400286660","doi":"10.3390/rs16132445","title":"Simulation-Based Optimization of Path Planning for Camera-Equipped UAVs That Considers the Location and Time of Construction Activities","year":2024,"lang":"en","type":"article","venue":"Remote Sensing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Computer science; Zoom; Data collection; Path (computing); Field (mathematics); Computer vision; Motion planning; Real-time computing; Artificial intelligence; Robot; Engineering","score_opus":0.01455757268905029,"score_gpt":0.23367140653501914,"score_spread":0.21911383384596886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400286660","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08691849,0.00046608518,0.90501106,0.00018396786,0.000079211706,0.00014914591,0.00020931014,0.0005952892,0.0063874386],"genre_scores_gemma":[0.82668155,0.00044240186,0.16940635,0.000051627274,0.000016644799,0.0003675373,0.00045686544,0.0000785381,0.0024983825],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997787,0.000057109588,0.000011786781,0.000052054544,0.00004854007,0.00005181428],"domain_scores_gemma":[0.99927753,0.00046403243,0.00009285022,0.000027377822,0.00009015286,0.000048107344],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004761043,0.0012638369,0.0010241806,0.0007175588,0.00040900093,0.0007253782,0.00087002746,0.00093047833,0.0018560684],"category_scores_gemma":[0.0014031269,0.0006516376,0.0010542134,0.00064038415,0.00059266196,0.00045494345,0.0007326671,0.00074748526,0.00018277326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001583006,0.000006409766,0.00022530092,0.000014970545,0.0000075675107,0.000013610455,0.000009135589,0.99698395,0.00023114275,0.0003776297,0.00006192327,0.0020524804],"study_design_scores_gemma":[0.0000040882724,0.000008212983,0.00005454467,0.0000015136551,0.0000029632538,0.0000025724873,0.00000484468,0.9995945,0.00010788584,0.00010979725,0.000107612395,0.0000014406969],"about_ca_topic_score_codex":0.023765715,"about_ca_topic_score_gemma":0.017195297,"teacher_disagreement_score":0.023765715,"about_ca_system_score_codex":0.00074547465,"about_ca_system_score_gemma":0.0021050079,"threshold_uncertainty_score":0.04725474},"labels":[],"label_agreement":null},{"id":"W4400322366","doi":"10.3390/buildings14072041","title":"Factor Analysis for In Situ Reinforced Concrete Beam Production: A Principal Component Analysis Approach","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"EllisDon (Canada)","funders":"","keywords":"Principal component analysis; Ranking (information retrieval); Production (economics); Beam (structure); Productivity; Principal (computer security); Duration (music); Engineering; Environmental science; Mathematics; Structural engineering; Statistics; Computer science; Economics; Artificial intelligence; Economic growth","score_opus":0.014947815558178501,"score_gpt":0.23183733428323708,"score_spread":0.21688951872505857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400322366","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4482951,0.001386614,0.5210675,0.0009764765,0.00026938005,0.006854595,0.0043596514,0.0012417076,0.015548957],"genre_scores_gemma":[0.6352082,0.0008257253,0.35352382,0.00005858729,0.000056006094,0.005295683,0.0024191833,0.00012533214,0.0024874276],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9943522,0.0028704917,0.00041320457,0.0006898387,0.0014051433,0.00026914876],"domain_scores_gemma":[0.99053544,0.0053846305,0.000901054,0.00057557947,0.0024361357,0.00016714669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008720254,0.0019177938,0.0011558639,0.0070517156,0.0011638447,0.0025929087,0.00072622835,0.00046194304,0.0056932117],"category_scores_gemma":[0.02043952,0.0004626435,0.0022131042,0.010548015,0.0008927746,0.001305343,0.0013345814,0.0013347815,0.0010859014],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051177526,0.0011753552,0.18274109,0.0027754894,0.0017448441,0.0009340118,0.027062122,0.012685794,0.014344361,0.023642475,0.01261055,0.71977204],"study_design_scores_gemma":[0.00021560927,0.002572197,0.66124004,0.0018968415,0.001365711,0.00094585505,0.04511578,0.15281846,0.013602996,0.03756318,0.082087204,0.0005760756],"about_ca_topic_score_codex":0.0070455144,"about_ca_topic_score_gemma":0.006480998,"teacher_disagreement_score":0.008720254,"about_ca_system_score_codex":0.000971242,"about_ca_system_score_gemma":0.0039489144,"threshold_uncertainty_score":0.046117663},"labels":[],"label_agreement":null},{"id":"W4400423841","doi":"10.3390/buildings14072084","title":"Development of a Cloud-Based Building Information Modeling Design Configurator to Auto-Link Material Catalogs with Code-Compliant Designs of Residential Buildings","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Configurator; Systems engineering; Modular design; Computer science; Cloud computing; Software engineering; Supply chain; Certification; Building information modeling; Personalization; Engineering; Database; World Wide Web; Operating system","score_opus":0.02232136015867906,"score_gpt":0.2322101694418897,"score_spread":0.20988880928321066,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400423841","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04272893,0.0001832471,0.8955503,0.00032090678,0.00007400633,0.0007988569,0.0013785894,0.042632263,0.016332893],"genre_scores_gemma":[0.25003093,0.0002457964,0.7351649,0.00015548187,0.0000134828015,0.00048083081,0.0035123092,0.0020041545,0.008392123],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949443,0.0000821522,0.00003793283,0.00010600507,0.0002272608,0.00005225254],"domain_scores_gemma":[0.9992924,0.00011272865,0.00005684729,0.00029340677,0.00016499002,0.000079623045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00060889596,0.00077057985,0.0004568776,0.0007537266,0.0004818306,0.0013065664,0.0022714809,0.0005962808,0.0061197816],"category_scores_gemma":[0.0015755736,0.00051428017,0.0010727384,0.00070839335,0.00034122038,0.0014686972,0.0014863117,0.0009199485,0.0023875022],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007188464,0.0012267316,0.015295114,0.0007382495,0.0002890671,0.0018745183,0.0017588518,0.19845577,0.09875033,0.039371546,0.04919163,0.59232944],"study_design_scores_gemma":[0.00012745961,0.00021699647,0.004354948,0.00009986488,0.00008648868,0.00054522895,0.0003063576,0.8543478,0.04056803,0.0061986116,0.093037695,0.000110452886],"about_ca_topic_score_codex":0.008088705,"about_ca_topic_score_gemma":0.01343118,"teacher_disagreement_score":0.008088705,"about_ca_system_score_codex":0.0008467271,"about_ca_system_score_gemma":0.0012986759,"threshold_uncertainty_score":0.020472705},"labels":[],"label_agreement":null},{"id":"W4400447231","doi":"10.2139/ssrn.4890093","title":"Integrated Fuzzy System Dynamics–Fuzzy Agent-Based Modeling of Construction Crew Motivation and Productivity","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Crew; Productivity; Fuzzy logic; Computer science; Dynamics (music); Engineering; Artificial intelligence; Economics; Aeronautics; Psychology; Economic growth","score_opus":0.008824091317364202,"score_gpt":0.20140401590620602,"score_spread":0.19257992458884182,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400447231","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30582023,0.0002980049,0.66386205,0.0007045237,0.00008040248,0.000072486735,0.000291971,0.00015960586,0.028710825],"genre_scores_gemma":[0.9835354,0.00012375215,0.01104916,0.000014202421,0.000010649222,0.000052079868,0.00005251377,0.000012096945,0.0051500225],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99979275,0.00007336835,0.00000855532,0.000043399345,0.00004786355,0.00003404544],"domain_scores_gemma":[0.99962354,0.00018681014,0.000057989426,0.000016874532,0.000081613805,0.00003307833],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055289984,0.00040799682,0.0005769545,0.0005795032,0.00041667416,0.0014553609,0.0008861447,0.0009966543,0.0042064064],"category_scores_gemma":[0.0015342808,0.0003548676,0.00051008846,0.0007381443,0.0005673076,0.0009633106,0.00067734433,0.0006098249,0.0003772653],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025857142,0.00004045206,0.0010411091,0.00001713044,0.00002301449,0.000043482654,0.00008717727,0.9758069,0.00054332986,0.018321918,0.00019004259,0.0038595803],"study_design_scores_gemma":[0.000002943326,0.000006346668,0.00023575281,0.0000017498822,0.0000029364096,0.0000035405067,0.000013507278,0.99717194,0.00005109776,0.0023574035,0.00015028726,0.0000025462432],"about_ca_topic_score_codex":0.017504128,"about_ca_topic_score_gemma":0.008834733,"teacher_disagreement_score":0.017504128,"about_ca_system_score_codex":0.00102939,"about_ca_system_score_gemma":0.0011229246,"threshold_uncertainty_score":0.034804463},"labels":[],"label_agreement":null},{"id":"W4400564300","doi":"10.4236/ojce.2024.143015","title":"A Building Information Modeling-Life Cycle Cost Analysis Integrated Model to Enhance Decisions Related to the Selection of Construction Methods at the Conceptual Design Stage of Buildings","year":2024,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Life-cycle cost analysis; Modular design; Systems engineering; Engineering; Process (computing); Conceptual design; Product life-cycle management; Building design; Computer science; Risk analysis (engineering); Process management; Construction engineering; Architectural engineering; Operations management; Reliability engineering; Business","score_opus":0.02201787690699258,"score_gpt":0.3084261894161085,"score_spread":0.2864083125091159,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400564300","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03529292,0.00047559448,0.8987073,0.001574963,0.00014337992,0.0005512514,0.004215885,0.0021219898,0.05691684],"genre_scores_gemma":[0.43093738,0.0009403708,0.5389618,0.00028705766,0.00007483606,0.0015841034,0.0047626756,0.00040502122,0.022046708],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993917,0.00018253436,0.000031752734,0.00009434314,0.0002260521,0.000073622374],"domain_scores_gemma":[0.9992144,0.00037999207,0.000066835535,0.00007779231,0.00021501568,0.000045997593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010800071,0.0011195287,0.00078385137,0.0013433888,0.00072456955,0.0026031507,0.002229533,0.0018573956,0.0074773845],"category_scores_gemma":[0.0020332355,0.0007612754,0.001525031,0.0017714731,0.0003951003,0.0023109524,0.0014280411,0.0013984698,0.0015121368],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026788844,0.00006829116,0.0007553201,0.000065359876,0.000028161081,0.00007783521,0.000035692905,0.9619181,0.0005067593,0.023029013,0.0016426331,0.011845974],"study_design_scores_gemma":[0.000011863372,0.000016221524,0.00017307414,0.000021144107,0.000019233466,0.00002256601,0.000019619809,0.98787796,0.00040023896,0.0051793368,0.00624696,0.00001180858],"about_ca_topic_score_codex":0.02163507,"about_ca_topic_score_gemma":0.023194268,"teacher_disagreement_score":0.02163507,"about_ca_system_score_codex":0.0026749745,"about_ca_system_score_gemma":0.003687658,"threshold_uncertainty_score":0.04301822},"labels":[],"label_agreement":null},{"id":"W4400607694","doi":"10.1680/jfoen.2024.177.3.73","title":"Editorial: Themed issue on reuse of foundations and structures","year":2024,"lang":"en","type":"editorial","venue":"Proceedings of the Institution of Civil Engineers - Forensic Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reuse; Computer science; Engineering; Waste management","score_opus":0.0045611487871670305,"score_gpt":0.20428825809958115,"score_spread":0.1997271093124141,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400607694","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00003102108,0.0028694328,0.00006937286,0.02338624,0.9719534,0.00002113393,0.00007044315,0.000044547407,0.001554423],"genre_scores_gemma":[0.0003291242,0.003458169,0.00007583911,0.024575427,0.9596202,0.00003863175,0.000072957824,0.000053632317,0.011776025],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9943743,0.0006595163,0.0005167635,0.000940145,0.0029912314,0.00051816157],"domain_scores_gemma":[0.98924226,0.0035818033,0.0007315151,0.00041000854,0.004257449,0.0017770368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0049264315,0.003775652,0.00351471,0.0032459048,0.0033303415,0.0113925645,0.0049300888,0.019695356,0.05411079],"category_scores_gemma":[0.020914288,0.0014145075,0.0036057644,0.0015061169,0.0030704308,0.007321589,0.003398818,0.01678782,0.03623353],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003620129,0.000016160462,0.000023021148,0.00025766058,0.000010188436,0.000053809676,0.000014167142,0.000025414984,0.000064675885,0.00022278937,0.9951632,0.004112728],"study_design_scores_gemma":[0.00005041361,0.000030746127,0.00020210921,0.0005656985,0.00002067716,0.00014508469,0.000043093503,0.0000789331,0.000091862785,0.0008744913,0.99787855,0.00001839575],"about_ca_topic_score_codex":0.0016491864,"about_ca_topic_score_gemma":0.0029329055,"teacher_disagreement_score":0.05411079,"about_ca_system_score_codex":0.0033039828,"about_ca_system_score_gemma":0.0036455276,"threshold_uncertainty_score":0.18101865},"labels":[],"label_agreement":null},{"id":"W4400922350","doi":"10.51967/tepian.v4i4.2969","title":"Critical Path Analysis Using Microsoft Project 2016 on the Implementation Schedule of Residential House Construction Projects","year":2023,"lang":"en","type":"article","venue":"TEPIAN","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Kwantlen Polytechnic University","funders":"","keywords":"Schedule; Critical path method; Computer science; Path (computing); Transport engineering; Architectural engineering; Operations research; Engineering; Operating system; Systems engineering","score_opus":0.027037871511802862,"score_gpt":0.30832112155000974,"score_spread":0.28128325003820687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400922350","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5974032,0.00043952707,0.33467805,0.00040492442,0.00016615132,0.0035482347,0.014499559,0.0037453834,0.045114994],"genre_scores_gemma":[0.5091067,0.0003958475,0.47496936,0.00002025623,0.00001198671,0.0026563213,0.0066449842,0.0003648024,0.00582961],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975834,0.0010124096,0.00028758644,0.00028674104,0.0006572098,0.00017278067],"domain_scores_gemma":[0.98845714,0.007529486,0.0010982106,0.0002860806,0.002431743,0.00019738554],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005297473,0.00083961716,0.000542506,0.009394165,0.00094906555,0.0019627437,0.0005274902,0.00036545968,0.0105774775],"category_scores_gemma":[0.01668806,0.0005499371,0.00087132,0.008320459,0.00050373876,0.0019171231,0.0012069788,0.0008642359,0.0006129029],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017801417,0.0007164119,0.08787894,0.0027283367,0.0003829648,0.0010561631,0.017654425,0.12355397,0.0062618405,0.069793664,0.023133038,0.66506016],"study_design_scores_gemma":[0.00028790318,0.0016011822,0.14848644,0.0013517083,0.0005015852,0.0009011763,0.026898341,0.66467345,0.014962105,0.03835569,0.101520695,0.00045978773],"about_ca_topic_score_codex":0.015460786,"about_ca_topic_score_gemma":0.017864937,"teacher_disagreement_score":0.015460786,"about_ca_system_score_codex":0.0015866364,"about_ca_system_score_gemma":0.00413714,"threshold_uncertainty_score":0.03538519},"labels":[],"label_agreement":null},{"id":"W4400963000","doi":"10.34925/eip.2023.153.4.221","title":"ECONOMIC JUSTIFICATION FOR RENOVATION SERVICES OF A TYPICAL QUARTER","year":2023,"lang":"ru","type":"article","venue":"Экономика и предпринимательство","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Architectural engineering; Business; Engineering; History; Archaeology","score_opus":0.012709462405520448,"score_gpt":0.2369798363234249,"score_spread":0.22427037391790444,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400963000","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5458276,0.0011667468,0.015787417,0.02010317,0.000317052,0.00019343231,0.0019036315,0.00039762014,0.41430318],"genre_scores_gemma":[0.97496265,0.0002307495,0.0013598073,0.0003568694,0.000072788534,0.000036969457,0.00013003696,0.000036968082,0.022813125],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988564,0.00028220355,0.000050586463,0.00013889292,0.0002579259,0.00041401244],"domain_scores_gemma":[0.9981268,0.00042673043,0.00032212853,0.00023388707,0.000527135,0.00036342477],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014202251,0.00023104182,0.00029679434,0.0009422339,0.0019435781,0.004164233,0.00090902735,0.0018434331,0.014671835],"category_scores_gemma":[0.0069752773,0.00025456116,0.0006948787,0.0008052779,0.0013908751,0.0017147795,0.0014063168,0.0019080733,0.0009670648],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040009306,0.000086940265,0.018482586,0.00006548616,0.000044480865,0.0005639177,0.00075971946,0.008741224,0.0008211945,0.9283952,0.014512511,0.027126608],"study_design_scores_gemma":[0.00024072279,0.000403765,0.106829144,0.00032441944,0.00014087347,0.0010510469,0.008617199,0.05782616,0.003988938,0.3890292,0.43139142,0.00015710379],"about_ca_topic_score_codex":0.027819652,"about_ca_topic_score_gemma":0.02449364,"teacher_disagreement_score":0.027819652,"about_ca_system_score_codex":0.004024821,"about_ca_system_score_gemma":0.004068037,"threshold_uncertainty_score":0.055315495},"labels":[],"label_agreement":null},{"id":"W4400989880","doi":"10.69554/ajyh5686","title":"Understanding ORAT and how ADM's ORAT programme contributes to sustainability","year":2022,"lang":"en","type":"article","venue":"Journal of airport management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Sustainability; Deconstruction (building); Greenhouse gas; Project commissioning; Environmental economics; Process (computing); Business; Life-cycle assessment; Operations management; Engineering; Waste management; Economics; Computer science; Publishing; Production (economics); Political science","score_opus":0.027179754418163903,"score_gpt":0.21577515318538368,"score_spread":0.18859539876721979,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400989880","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15746368,0.0026955856,0.023047041,0.046900257,0.00027254975,0.00014735859,0.00022781068,0.000249113,0.7689966],"genre_scores_gemma":[0.9597314,0.002030334,0.009224933,0.0023491092,0.000069398324,0.00006481751,0.00010469155,0.00009278519,0.026332524],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974408,0.001140755,0.00003045174,0.00017431709,0.0004563871,0.00075734634],"domain_scores_gemma":[0.9978808,0.0007009801,0.00019508919,0.00016061134,0.00045738945,0.0006051595],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003515891,0.00034227714,0.00015256788,0.0009683412,0.002130872,0.0065291184,0.0009841706,0.0011932929,0.009316317],"category_scores_gemma":[0.0038276112,0.00016380048,0.00025219706,0.0011991176,0.0053986264,0.0036913147,0.004240236,0.0015015239,0.000775534],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046104677,0.0002507738,0.022469833,0.00038413442,0.000023936567,0.0004837891,0.017206995,0.0051487326,0.0015273335,0.7111394,0.02039569,0.22092324],"study_design_scores_gemma":[0.000014570413,0.0001093802,0.028149983,0.0009842509,0.000027900207,0.0003179033,0.03577383,0.0039305207,0.0016390929,0.12600125,0.8030056,0.000045759934],"about_ca_topic_score_codex":0.08180294,"about_ca_topic_score_gemma":0.11202276,"teacher_disagreement_score":0.08180294,"about_ca_system_score_codex":0.010238034,"about_ca_system_score_gemma":0.009049434,"threshold_uncertainty_score":0.16265357},"labels":[],"label_agreement":null},{"id":"W4400992377","doi":"10.69554/wzxv4814","title":"Intelligent design for facility asset management","year":2007,"lang":"en","type":"article","venue":"Journal of airport management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Facility management; Asset management; Asset (computer security); Business; Computer science; IT asset management; Computer security; Finance; Marketing","score_opus":0.023883279515413913,"score_gpt":0.24468006508530013,"score_spread":0.22079678556988622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4400992377","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0068512266,0.0020654895,0.79148805,0.0025527305,0.00023567844,0.00012227583,0.00009083545,0.0006711408,0.19592257],"genre_scores_gemma":[0.33978462,0.0026641705,0.5781635,0.00051404996,0.00011601801,0.00033230573,0.00023435477,0.00024542704,0.077945635],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9991474,0.00031409817,0.000036671696,0.000059733768,0.00035609808,0.00008593307],"domain_scores_gemma":[0.99963784,0.00008429932,0.000047364672,0.00008410651,0.000101881335,0.00004454271],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009889416,0.0005505132,0.00021220985,0.00062058226,0.0010220556,0.002705336,0.00078106945,0.00098964,0.009141026],"category_scores_gemma":[0.0011656326,0.0003428779,0.00033990285,0.00057973794,0.0018458052,0.0014636117,0.001674451,0.00073015643,0.0016479109],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000014003817,0.000019022993,0.00038783168,0.0001634999,0.000009918751,0.00011003485,0.00061160483,0.03337636,0.0025582712,0.8525808,0.01065355,0.09951507],"study_design_scores_gemma":[0.000013629695,0.00006288126,0.00060080487,0.00021497793,0.000020902164,0.00029587757,0.00063896057,0.04746255,0.0021947708,0.22997466,0.7184857,0.000034251032],"about_ca_topic_score_codex":0.0064120246,"about_ca_topic_score_gemma":0.011853121,"teacher_disagreement_score":0.009141026,"about_ca_system_score_codex":0.0034490759,"about_ca_system_score_gemma":0.0026357095,"threshold_uncertainty_score":0.030579805},"labels":[],"label_agreement":null},{"id":"W4401013860","doi":"10.15554/pcij60.1-ps1","title":"Project Spotlight: Precast concrete replaces cast stone at Boston College","year":2015,"lang":"en","type":"article","venue":"PCI Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Facade; Glory; Engineering; Arch; Pavilion; Forensic engineering; Civil engineering; Architectural engineering","score_opus":0.02651562424863152,"score_gpt":0.2390334027801721,"score_spread":0.21251777853154058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401013860","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42245337,0.0012382821,0.014473958,0.0053302795,0.0005163092,0.00058158033,0.0010362769,0.0020220838,0.55234784],"genre_scores_gemma":[0.64495355,0.00048793168,0.015205995,0.00035095404,0.000050311814,0.000092365575,0.00085152325,0.00051173323,0.33749565],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9992151,0.000099399986,0.0000074920536,0.000081405284,0.00044089823,0.00015572316],"domain_scores_gemma":[0.9995447,0.000017439655,0.000008173576,0.000039648112,0.000108463624,0.00028157939],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069894077,0.0003239407,0.00012309467,0.00054573163,0.0020278688,0.0019209115,0.0009616608,0.00068727223,0.044361103],"category_scores_gemma":[0.0007306228,0.0002154626,0.00014774488,0.00045748183,0.00070982834,0.00094574166,0.00210863,0.00069979555,0.004339651],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00079453824,0.0009705575,0.014520928,0.00023654118,0.000016784898,0.0012828286,0.013049466,0.0027790794,0.05287474,0.036493376,0.20125054,0.67573065],"study_design_scores_gemma":[0.00012300836,0.0010255806,0.021949891,0.0001439299,0.00001953328,0.00049813016,0.013234493,0.0032719201,0.021559404,0.0028201519,0.9353158,0.00003812482],"about_ca_topic_score_codex":0.105223976,"about_ca_topic_score_gemma":0.41098177,"teacher_disagreement_score":0.105223976,"about_ca_system_score_codex":0.0034693533,"about_ca_system_score_gemma":0.005763437,"threshold_uncertainty_score":0.20922303},"labels":[],"label_agreement":null},{"id":"W4401023482","doi":"10.24963/ijcai.2024/879","title":"KP-PINNs: Kernel Packet Accelerated Physics Informed Neural Networks","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada; Australian Government","keywords":"Computer science; Plan (archaeology); Geography","score_opus":0.01756495226819577,"score_gpt":0.2339171019009304,"score_spread":0.21635214963273464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401023482","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016384855,0.00030431926,0.9795759,0.00024450783,0.00009799252,0.000047281806,0.00007499831,0.00049569795,0.002774455],"genre_scores_gemma":[0.6645114,0.0008632405,0.32299662,0.00055129046,0.00013780672,0.000326263,0.0005637249,0.0003493761,0.009700307],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99972135,0.00007544356,0.000013213112,0.0000384881,0.00011646977,0.00003501672],"domain_scores_gemma":[0.99944574,0.00024001348,0.00006157558,0.000059588736,0.00015542036,0.000037658134],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007983384,0.00066506444,0.0007033428,0.00032504636,0.00035454435,0.0006630392,0.0019555534,0.00085891044,0.0023335402],"category_scores_gemma":[0.0029101341,0.0003742474,0.0004791588,0.0004022576,0.0007461815,0.0016146086,0.0016179865,0.0015396307,0.00044352195],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009666573,0.00005495942,0.00080777454,0.00010662791,0.0000471455,0.00008403208,0.000047654357,0.9057503,0.0022845478,0.034404,0.0027808049,0.05353555],"study_design_scores_gemma":[0.0000022905385,0.000006297369,0.000022294878,0.000001675404,0.0000016066831,0.000005001279,0.000002132203,0.9965209,0.00021870904,0.0029444767,0.0002730744,0.0000016906312],"about_ca_topic_score_codex":0.0038885083,"about_ca_topic_score_gemma":0.0037987626,"teacher_disagreement_score":0.0038885083,"about_ca_system_score_codex":0.0006372459,"about_ca_system_score_gemma":0.0013564567,"threshold_uncertainty_score":0.00780648},"labels":[],"label_agreement":null},{"id":"W4401032683","doi":"10.54254/2755-2721/72/20240986","title":"Maximizing project efficiency and collaboration in construction management through Building Information Modeling (BIM)","year":2024,"lang":"en","type":"article","venue":"Applied and Computational Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Building information modeling; Stakeholder; Workflow; Process management; Profitability index; Project management; Business; Return on investment; Knowledge management; Computer science; Systems engineering; Engineering; Operations management","score_opus":0.005383347659076168,"score_gpt":0.2061643089723207,"score_spread":0.20078096131324452,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401032683","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.30750865,0.0015106138,0.62979364,0.0031299724,0.00003589037,0.00023331103,0.00011272957,0.00041642712,0.057258736],"genre_scores_gemma":[0.8710425,0.00055563456,0.12697558,0.000054131,0.0000108159,0.00013441678,0.000057968617,0.000049578553,0.0011193571],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98941493,0.006993299,0.00030682707,0.00045363966,0.0022622596,0.0005691816],"domain_scores_gemma":[0.99482006,0.002763224,0.0010019165,0.00062495185,0.0005234197,0.00026642927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007678846,0.0006186444,0.00052951026,0.002402326,0.0014583603,0.0049467203,0.0011042621,0.0011296221,0.0015959145],"category_scores_gemma":[0.012029902,0.0005103185,0.00040285548,0.0041860207,0.0017558886,0.0050339014,0.0050377836,0.0008780308,0.0004018419],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017586001,0.0005393447,0.02869167,0.00052678393,0.00012985965,0.0002546542,0.005343897,0.34811932,0.006708004,0.20196341,0.003822811,0.4037243],"study_design_scores_gemma":[0.0000839148,0.000527574,0.02735458,0.00047025026,0.00017762899,0.00047834945,0.009189763,0.64801687,0.017169861,0.2462399,0.05013848,0.00015284316],"about_ca_topic_score_codex":0.00207254,"about_ca_topic_score_gemma":0.0033256032,"teacher_disagreement_score":0.007678846,"about_ca_system_score_codex":0.0021954286,"about_ca_system_score_gemma":0.003934962,"threshold_uncertainty_score":0.040610135},"labels":[],"label_agreement":null},{"id":"W4401054140","doi":"10.1061/jcemd4.coeng-14764","title":"Ontology-Based Design Features for Representing Constructability in Architectural Design: Toward BIM in Off-Site Construction","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Ontology; Construction engineering; Building information modeling; Engineering; Computer science; Architectural engineering; Systems engineering","score_opus":0.013213346052477279,"score_gpt":0.22449650179262517,"score_spread":0.2112831557401479,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401054140","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.089340694,0.00028827047,0.8803248,0.0013878042,0.000044003616,0.00047184865,0.00021916616,0.00018505908,0.027738413],"genre_scores_gemma":[0.4291413,0.00029991884,0.5674175,0.00012285929,0.000012238163,0.00056693517,0.00027710196,0.000068428526,0.002093724],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9945911,0.0029490066,0.0003711558,0.0003711742,0.001448446,0.00026912818],"domain_scores_gemma":[0.99517256,0.0019902205,0.0007544136,0.0010264624,0.00090785726,0.00014847072],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067826044,0.00068956194,0.0003938877,0.004383508,0.001930881,0.0051904516,0.0015380937,0.0013907492,0.0011172248],"category_scores_gemma":[0.010052445,0.00055383524,0.0011933834,0.0041418537,0.00560453,0.0078274235,0.0030166411,0.0017716374,0.00023589795],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008353551,0.00026767765,0.0101567395,0.0004220774,0.000059828206,0.0006510385,0.044705365,0.015397878,0.008460226,0.75739664,0.0021372673,0.16026166],"study_design_scores_gemma":[0.0000639766,0.0002636732,0.017710552,0.0011751639,0.00031875534,0.0019315751,0.074722774,0.14274032,0.014882224,0.49961644,0.24635336,0.00022125215],"about_ca_topic_score_codex":0.0078100925,"about_ca_topic_score_gemma":0.0125686,"teacher_disagreement_score":0.0078100925,"about_ca_system_score_codex":0.00351383,"about_ca_system_score_gemma":0.0052627963,"threshold_uncertainty_score":0.035870254},"labels":[],"label_agreement":null},{"id":"W4401065030","doi":"10.4236/ojce.2024.143016","title":"Integrating Virtual Reality and Energy Analysis with BIM to Optimize Window-to-Wall Ratio and Building&amp;#8217;s Orientation for Age-in-Place Design at the Conceptual Stage","year":2024,"lang":"en","type":"article","venue":"Open Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Stage (stratigraphy); Window (computing); Orientation (vector space); Conceptual design; Augmented reality; Computer science; Engineering; Human–computer interaction; Mathematics; Geometry; Geology","score_opus":0.01940961096708413,"score_gpt":0.25849754683280196,"score_spread":0.23908793586571783,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401065030","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14355612,0.00016020758,0.8371841,0.0001440511,0.00003822919,0.00014195837,0.00014397569,0.0007619721,0.017869357],"genre_scores_gemma":[0.72943705,0.00023332945,0.26634052,0.0000323185,0.0000073842916,0.00016718375,0.00016958753,0.00014269755,0.0034699193],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995414,0.00017086221,0.000020288793,0.000060056693,0.00016437129,0.000043087995],"domain_scores_gemma":[0.99969125,0.00013653215,0.000039529292,0.000063352294,0.000053630174,0.000015647374],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000649871,0.0007205949,0.00051657204,0.0006869906,0.00029541756,0.0017932593,0.00070368336,0.00062987895,0.002932858],"category_scores_gemma":[0.0011366431,0.00045905774,0.0007434063,0.00050180766,0.00040928545,0.0013284556,0.0010580724,0.00037895894,0.00057265494],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009112462,0.00026814756,0.0028222294,0.00014317906,0.00003221638,0.000096048076,0.00035336253,0.8877788,0.015840385,0.011755006,0.00045405782,0.08036535],"study_design_scores_gemma":[0.000013491702,0.00013724064,0.0010978248,0.000023446597,0.000026039786,0.00006980581,0.0001544073,0.9817479,0.009113012,0.0020410172,0.005540309,0.00003541171],"about_ca_topic_score_codex":0.00229151,"about_ca_topic_score_gemma":0.004224194,"teacher_disagreement_score":0.002932858,"about_ca_system_score_codex":0.0004812858,"about_ca_system_score_gemma":0.00085538864,"threshold_uncertainty_score":0.009811342},"labels":[],"label_agreement":null},{"id":"W4401215821","doi":"10.3390/buildings14082374","title":"Current Research and Future Directions for Off-Site Construction through LangChain with a Large Language Model","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":13,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Current (fluid); Architectural engineering; Engineering; Systems engineering; Computer science; Construction engineering; Electrical engineering","score_opus":0.016606830352894966,"score_gpt":0.2968478723084985,"score_spread":0.28024104195560356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401215821","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.049430948,0.059667356,0.69961464,0.112646796,0.0017652002,0.0011167133,0.0020622623,0.0060869884,0.06760909],"genre_scores_gemma":[0.2430987,0.04582435,0.6850105,0.004229671,0.0009491386,0.0015896962,0.0042165276,0.000961707,0.01411974],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9821931,0.012155735,0.001236346,0.001394318,0.0023917097,0.00062879553],"domain_scores_gemma":[0.88550264,0.075796366,0.0044479687,0.014190981,0.016198358,0.0038637144],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.033309054,0.0010099949,0.0010716282,0.0057724584,0.0015279839,0.011514166,0.0032856022,0.0024192308,0.025012743],"category_scores_gemma":[0.05809846,0.0006497304,0.0015478559,0.008466149,0.0034164623,0.030673627,0.004994456,0.0023034788,0.006979694],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000292861,0.000590221,0.010484836,0.003937211,0.00011549549,0.00033547712,0.0074473377,0.009177017,0.0035714847,0.2647775,0.025373988,0.67389655],"study_design_scores_gemma":[0.00011927666,0.00033424445,0.0027956283,0.005837088,0.0001817318,0.0004690218,0.013856189,0.07951244,0.004585672,0.36704072,0.52504545,0.0002225302],"about_ca_topic_score_codex":0.005388502,"about_ca_topic_score_gemma":0.007297083,"teacher_disagreement_score":0.033309054,"about_ca_system_score_codex":0.0037057472,"about_ca_system_score_gemma":0.016057277,"threshold_uncertainty_score":0.17615724},"labels":[],"label_agreement":null},{"id":"W4401536676","doi":"10.22178/pos.106-19","title":"Comparative Analysis of Digital Technology in Architectural, Engineering Construction Industries Across Six Continents of the World: A Global Perspective","year":2024,"lang":"en","type":"article","venue":"Path of Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Economic geography; Regional science; Engineering; Sociology; Geography; Computer science","score_opus":0.0099140800811458,"score_gpt":0.2721274676303608,"score_spread":0.26221338754921497,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401536676","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9785446,0.0019906613,0.00027472837,0.00032094936,0.000010814999,0.000006898653,0.0001487347,0.000003557213,0.01869899],"genre_scores_gemma":[0.9974969,0.0014581318,0.00025431046,0.00005056176,0.00000677164,0.00000599249,0.00015760843,0.0000026868581,0.00056690816],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9992163,0.00023693265,0.00005800783,0.00009659682,0.00021786997,0.00017427537],"domain_scores_gemma":[0.9979506,0.0008086837,0.00054069055,0.00011023531,0.00040822927,0.00018146377],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008623279,0.00017015317,0.00018997664,0.0072786617,0.00075889565,0.0021954232,0.00018519061,0.00026195493,0.003007561],"category_scores_gemma":[0.0024922616,0.000094283976,0.00026697555,0.014565478,0.00097612984,0.0021909403,0.001628686,0.00035126324,0.0002006415],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015425505,0.00013389646,0.7547706,0.0004952996,0.00012318358,0.0013439419,0.038661785,0.00061044097,0.0024750968,0.027441433,0.0011194956,0.1726706],"study_design_scores_gemma":[0.0000027668896,0.00009068446,0.9096095,0.00017045483,0.000049349535,0.0005501111,0.07121935,0.00022832381,0.0004404777,0.00097580464,0.016649563,0.000013518961],"about_ca_topic_score_codex":0.0039970707,"about_ca_topic_score_gemma":0.009232228,"teacher_disagreement_score":0.0072786617,"about_ca_system_score_codex":0.0007661314,"about_ca_system_score_gemma":0.00061981945,"threshold_uncertainty_score":0.010061264},"labels":[],"label_agreement":null},{"id":"W4401702875","doi":"10.2139/ssrn.4928724","title":"Quantifying the Impact of Geometry Consideration Using Reference Energy Models for Building Cluster Simulation","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Cluster (spacecraft); Geometry; Computer science; Energy (signal processing); Mathematics; Statistics","score_opus":0.05263392034918904,"score_gpt":0.32490933378586484,"score_spread":0.27227541343667583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401702875","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79556423,0.0003989362,0.16996902,0.00044123607,0.0000884679,0.0001016955,0.0008687323,0.000702668,0.031865027],"genre_scores_gemma":[0.99026674,0.000085480606,0.008720266,0.000025285326,0.000006495822,0.00002341291,0.00016114471,0.00011898871,0.0005921817],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99950385,0.00019947537,0.000017646038,0.00004784406,0.00015667891,0.00007454903],"domain_scores_gemma":[0.9983335,0.0009732359,0.00008010588,0.0003061678,0.00024307889,0.00006393978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00079207437,0.00067535223,0.0008599123,0.0005744841,0.00057785347,0.0010827725,0.0013229356,0.0012750238,0.0033124038],"category_scores_gemma":[0.0048819343,0.0004782421,0.0005321438,0.0010466874,0.00056824216,0.0011403468,0.001054259,0.0006905592,0.00035333482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002567348,0.000017844777,0.0004484528,0.000011504534,0.0000061054575,0.000011018652,0.000010528038,0.99577576,0.00043578655,0.0017173804,0.00006433418,0.0014755918],"study_design_scores_gemma":[0.000004535893,0.000021497177,0.00020708628,0.0000035145156,0.0000051118977,0.000004430684,0.000011578015,0.998168,0.0006544343,0.000741717,0.00017384267,0.0000041739368],"about_ca_topic_score_codex":0.027625777,"about_ca_topic_score_gemma":0.01984343,"teacher_disagreement_score":0.027625777,"about_ca_system_score_codex":0.0010384574,"about_ca_system_score_gemma":0.0011988721,"threshold_uncertainty_score":0.054929912},"labels":[],"label_agreement":null},{"id":"W4401710488","doi":"10.1007/978-3-031-60419-5","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 2","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering; Engineering ethics; Library science; Environmental ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005257388716667365,"score_gpt":0.17710796248959093,"score_spread":0.17185057377292356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401710488","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030915665,0.018950291,0.00346425,0.026857408,0.0664903,0.00020291923,0.005920286,0.0008160704,0.87420684],"genre_scores_gemma":[0.0032761097,0.0045594396,0.00080256315,0.00067137,0.00088684005,0.000026028241,0.0018569235,0.00018785891,0.9877329],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986098,0.000070631,0.000021982069,0.00007715567,0.0010195749,0.00020077426],"domain_scores_gemma":[0.9979583,0.0000678406,0.00002105588,0.000050927858,0.0014708391,0.00043102706],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014217496,0.0012144163,0.0008918046,0.0018834368,0.0025833885,0.0055253333,0.0012794611,0.0019302729,0.31163558],"category_scores_gemma":[0.001537961,0.00043899365,0.0005252035,0.0023327633,0.0009449296,0.001414189,0.0018040256,0.0018778819,0.11121627],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001862987,0.00001944322,0.00010578675,0.000046875168,0.000002506066,0.000017072349,0.000023686318,0.00008931777,0.00023760402,0.0011664237,0.9716589,0.026613867],"study_design_scores_gemma":[0.0000033997512,0.0000049627783,0.00058073486,0.00003855115,0.0000033943409,0.0000133789945,0.00008263326,0.00012617095,0.000138353,0.00044511605,0.99855727,0.000006030454],"about_ca_topic_score_codex":0.4244655,"about_ca_topic_score_gemma":0.71629834,"teacher_disagreement_score":0.9924985,"about_ca_system_score_codex":0.0075014904,"about_ca_system_score_gemma":0.02429813,"threshold_uncertainty_score":0.98186827},"labels":[],"label_agreement":null},{"id":"W4401794558","doi":"10.1108/sasbe-11-2023-0364","title":"The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (PRABS)","year":2024,"lang":"en","type":"article","venue":"Smart and Sustainable Built Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Trinity College","funders":"","keywords":"Brownfield; Decision support system; Systems engineering; Risk assessment; Computer science; Risk analysis (engineering); Engineering; Environmental science; Business; Civil engineering; Data mining; Redevelopment","score_opus":0.007792752009681021,"score_gpt":0.21943595466118312,"score_spread":0.2116432026515021,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401794558","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3121486,0.0004816349,0.65593964,0.0022718657,0.00034474113,0.006242081,0.0010543908,0.0037423475,0.017774766],"genre_scores_gemma":[0.395659,0.00021097508,0.59951264,0.0002378855,0.000030916286,0.0013098891,0.0008742656,0.0001276932,0.0020367908],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.978884,0.012752455,0.0018477316,0.0019148249,0.0040567005,0.0005443933],"domain_scores_gemma":[0.94032276,0.03578269,0.0038773771,0.006390085,0.012012484,0.0016146752],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.029614035,0.0009232633,0.00060949224,0.0023420625,0.0013364747,0.0048203776,0.0022564693,0.0016114739,0.0033893806],"category_scores_gemma":[0.04944743,0.00053189637,0.00079468376,0.0012639842,0.001989795,0.0038064173,0.003064633,0.0013833282,0.0010535652],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017027076,0.0019975083,0.04240682,0.0035364465,0.00031346612,0.0012422692,0.018137725,0.12532265,0.043788847,0.04566103,0.009871912,0.7060187],"study_design_scores_gemma":[0.0010930679,0.010034134,0.038123332,0.0058816103,0.00056172383,0.0012269526,0.030323302,0.52963763,0.11419938,0.051247012,0.21688305,0.0007888322],"about_ca_topic_score_codex":0.0026784446,"about_ca_topic_score_gemma":0.0018881658,"teacher_disagreement_score":0.029614035,"about_ca_system_score_codex":0.002151592,"about_ca_system_score_gemma":0.0069471044,"threshold_uncertainty_score":0.15661585},"labels":[],"label_agreement":null},{"id":"W4401847930","doi":"10.1108/ci-08-2023-0210","title":"Where lean construction and offsite construction meet: a bibliographic scientometric analysis","year":2024,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Lean construction; Computer science; Engineering; Construction engineering; Construction industry","score_opus":0.010108373769357018,"score_gpt":0.23181314956201535,"score_spread":0.22170477579265832,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4401847930","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70102614,0.09808735,0.024835251,0.008296634,0.0006513839,0.0048897984,0.031680416,0.00048812813,0.1300449],"genre_scores_gemma":[0.92060876,0.04178317,0.022232959,0.00030687012,0.00037353658,0.0022259657,0.00935478,0.00012793762,0.0029860507],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9699332,0.007761307,0.0066137854,0.0017412935,0.012841361,0.001109128],"domain_scores_gemma":[0.9180641,0.04667266,0.012758862,0.00325196,0.018129647,0.001122699],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.019435354,0.0008531282,0.0020400991,0.21644206,0.002789088,0.016070526,0.0011010645,0.0011448648,0.006109436],"category_scores_gemma":[0.09382231,0.00051351456,0.0021560253,0.28835714,0.0024156221,0.009366786,0.005499767,0.00078806345,0.001009269],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041832105,0.0002563523,0.26557446,0.042617563,0.0018399685,0.0026397435,0.053411994,0.0030465215,0.003662994,0.04563202,0.022250641,0.5586494],"study_design_scores_gemma":[0.00009558588,0.00042828778,0.5365254,0.029348306,0.0030822696,0.0030163596,0.166207,0.0070645483,0.005279686,0.029280609,0.21935728,0.0003146578],"about_ca_topic_score_codex":0.009191092,"about_ca_topic_score_gemma":0.009146483,"teacher_disagreement_score":0.78355795,"about_ca_system_score_codex":0.0060920855,"about_ca_system_score_gemma":0.011864307,"threshold_uncertainty_score":0.10278523},"labels":[{"model":"gemma","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":["bibliometrics"],"domain":null,"study_design":"observational","genre":"empirical","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"agree"},{"id":"W4402003757","doi":"10.1007/978-981-97-1257-1_112","title":"A BIM-Based Numerical Simulation Framework for Tunnels Under Complex Geological Conditions","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Geomechanica (Canada)","funders":"","keywords":"Geology; Computer science; Civil engineering; Engineering","score_opus":0.024348392902550458,"score_gpt":0.25787099678876674,"score_spread":0.2335226038862163,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402003757","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0044695437,0.00012174754,0.986128,0.0000896296,0.000074430296,0.00006368669,0.00041950858,0.0027001614,0.0059332973],"genre_scores_gemma":[0.15722547,0.0006455603,0.8288058,0.00013660786,0.000073594965,0.0005244241,0.0018508699,0.0017304171,0.009007211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99956685,0.000091436654,0.000031641695,0.000051433657,0.00021589547,0.00004260675],"domain_scores_gemma":[0.99963486,0.000108954264,0.000022242244,0.00006389332,0.00012714897,0.000042874108],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080853957,0.0010422743,0.0012916113,0.0009149554,0.0010631953,0.002284884,0.0029343504,0.0016254142,0.00831909],"category_scores_gemma":[0.0013259718,0.0011234981,0.0012861767,0.0011828003,0.0007580583,0.0014121569,0.0021331497,0.0014549133,0.0026672094],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002377778,0.00008344355,0.00031955942,0.00006712401,0.000031514293,0.00012148459,0.000078067016,0.93712425,0.0022032857,0.030883804,0.003221074,0.025842534],"study_design_scores_gemma":[0.000005331154,0.0000039600736,0.000040417526,0.00000859539,0.000003934919,0.000020888501,0.000009084647,0.9914596,0.00035058643,0.0045811734,0.0035090453,0.000007309904],"about_ca_topic_score_codex":0.010559074,"about_ca_topic_score_gemma":0.013471362,"teacher_disagreement_score":0.010559074,"about_ca_system_score_codex":0.00072070066,"about_ca_system_score_gemma":0.0015727639,"threshold_uncertainty_score":0.027830124},"labels":[],"label_agreement":null},{"id":"W4402005697","doi":"10.18280/ijsdp.190812","title":"The Role of Design Characteristics of Building Complexes in Achieving Integration","year":2024,"lang":"en","type":"article","venue":"International Journal of Sustainable Development and Planning","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Systems engineering; Architectural engineering; Computer science; Construction engineering; Engineering","score_opus":0.00985494919972035,"score_gpt":0.23236958322921628,"score_spread":0.22251463402949592,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402005697","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.85872,0.0003448231,0.09451475,0.0001611221,0.00003997148,0.00012839699,0.00013059395,0.00015739226,0.04580302],"genre_scores_gemma":[0.9931814,0.000045750927,0.005921113,0.000005494901,0.0000041919016,0.00001919261,0.000026028694,0.0000680563,0.00072867755],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99810827,0.00068236934,0.00014877795,0.00021571145,0.00061237405,0.00023244917],"domain_scores_gemma":[0.9887651,0.0068575004,0.0012816642,0.00084629015,0.0017643804,0.00048504357],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015192102,0.0006253032,0.0005600925,0.0016278822,0.001213741,0.00537832,0.00081396516,0.0011053844,0.008209095],"category_scores_gemma":[0.015057106,0.0006585484,0.00029993986,0.0013073831,0.0015989816,0.0035960656,0.0016599622,0.0004785214,0.0013170086],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015102121,0.0008580178,0.16422921,0.0013827218,0.00017117556,0.0019089069,0.00528427,0.31523985,0.16065697,0.13831407,0.0021466818,0.20829794],"study_design_scores_gemma":[0.0001530816,0.0018295738,0.3047335,0.00032196063,0.00041041055,0.004683713,0.014470858,0.4325098,0.118234575,0.08747108,0.034799732,0.0003817857],"about_ca_topic_score_codex":0.0012848097,"about_ca_topic_score_gemma":0.0022014324,"teacher_disagreement_score":0.008209095,"about_ca_system_score_codex":0.0010511646,"about_ca_system_score_gemma":0.000745274,"threshold_uncertainty_score":0.027462184},"labels":[],"label_agreement":null},{"id":"W4402030817","doi":"10.1002/9781119902317.ch13","title":"The Language of Digital Technologies","year":2024,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Computer science; Computer graphics (images); Linguistics; Philosophy","score_opus":0.0035078658981805223,"score_gpt":0.1909229669386404,"score_spread":0.18741510104045986,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402030817","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053345445,0.048685476,0.06779272,0.027544124,0.0046662167,0.000100451536,0.0002933437,0.00022525401,0.8453579],"genre_scores_gemma":[0.5486671,0.099628665,0.093106076,0.028931744,0.010754028,0.0014139988,0.0010344475,0.00094905315,0.2155149],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99361306,0.00347116,0.0004701162,0.00054710684,0.0014980396,0.00040050122],"domain_scores_gemma":[0.9962966,0.0024347235,0.00023353392,0.00041842167,0.00044799448,0.00016875577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00452572,0.00093197904,0.0007080022,0.0036319345,0.003991156,0.012305618,0.0014856467,0.0023727922,0.006941757],"category_scores_gemma":[0.0060727396,0.00029497006,0.00053335645,0.0048989463,0.022225019,0.014727603,0.005170608,0.004979179,0.0026494649],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000017762262,0.0000017674159,0.000018740633,0.000034717657,8.9951857e-7,0.000024642957,0.0018907228,0.000038836715,0.0000360672,0.99117833,0.0030272298,0.0037462777],"study_design_scores_gemma":[0.0000030452459,0.000006480269,0.00007015765,0.0002787092,0.0000024137805,0.00019025775,0.0023192896,0.00014603254,0.00010438605,0.26465875,0.73221195,0.000008622936],"about_ca_topic_score_codex":0.0033454369,"about_ca_topic_score_gemma":0.0020638264,"teacher_disagreement_score":0.012305618,"about_ca_system_score_codex":0.0047265003,"about_ca_system_score_gemma":0.0034942182,"threshold_uncertainty_score":0.034293294},"labels":[],"label_agreement":null},{"id":"W4402035630","doi":"10.32920/26882476.v1","title":"Experiments to Determine the Most Effective Way to Map BIM Information Into Athena Software for Embodied Carbon Calculations","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Embodied cognition; Software; Carbon fibers; Computer science; Operating system; Artificial intelligence","score_opus":0.010356432954566829,"score_gpt":0.2505767075328672,"score_spread":0.24022027457830036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402035630","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7193779,0.00035156248,0.23950492,0.0003746838,0.00026661562,0.0015672839,0.003547496,0.009195779,0.025813727],"genre_scores_gemma":[0.59937763,0.00024166261,0.38988888,0.00014194174,0.000020271527,0.0013075095,0.004020281,0.00071861676,0.004283162],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99812037,0.0008486797,0.00013012394,0.00033850834,0.0004223726,0.00013986445],"domain_scores_gemma":[0.9933727,0.003846212,0.0002446696,0.0014075857,0.00096984336,0.00015903596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030861453,0.00089240127,0.00045605653,0.00094867276,0.0004387307,0.0011872714,0.0012900911,0.0007389206,0.009820661],"category_scores_gemma":[0.013844788,0.00048337565,0.0007519926,0.0012084778,0.00047233386,0.002639603,0.001300849,0.0009211747,0.0023984553],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006105199,0.007317601,0.02195446,0.003045474,0.00048066786,0.000479488,0.0024588176,0.17898767,0.09137517,0.0263081,0.016281856,0.64520544],"study_design_scores_gemma":[0.0006336671,0.004068412,0.020948747,0.00037131787,0.00034471127,0.0003293687,0.0018746355,0.72066516,0.18980941,0.013525592,0.047201376,0.00022757378],"about_ca_topic_score_codex":0.003304685,"about_ca_topic_score_gemma":0.0024414617,"teacher_disagreement_score":0.009820661,"about_ca_system_score_codex":0.00043305216,"about_ca_system_score_gemma":0.0006125511,"threshold_uncertainty_score":0.032853425},"labels":[],"label_agreement":null},{"id":"W4402035631","doi":"10.32920/26882476","title":"Experiments to Determine the Most Effective Way to Map BIM Information Into Athena Software for Embodied Carbon Calculations","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University","funders":"","keywords":"Embodied cognition; Software; Carbon fibers; Computer science; Artificial intelligence; Algorithm; Programming language","score_opus":0.010356432954566829,"score_gpt":0.2505767075328672,"score_spread":0.24022027457830036,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402035631","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7193779,0.00035156248,0.23950492,0.0003746838,0.00026661562,0.0015672839,0.003547496,0.009195779,0.025813727],"genre_scores_gemma":[0.59937763,0.00024166261,0.38988888,0.00014194174,0.000020271527,0.0013075095,0.004020281,0.00071861676,0.004283162],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99812037,0.0008486797,0.00013012394,0.00033850834,0.0004223726,0.00013986445],"domain_scores_gemma":[0.9933727,0.003846212,0.0002446696,0.0014075857,0.00096984336,0.00015903596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030861453,0.00089240127,0.00045605653,0.00094867276,0.0004387307,0.0011872714,0.0012900911,0.0007389206,0.009820661],"category_scores_gemma":[0.013844788,0.00048337565,0.0007519926,0.0012084778,0.00047233386,0.002639603,0.001300849,0.0009211747,0.0023984553],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.006105199,0.007317601,0.02195446,0.003045474,0.00048066786,0.000479488,0.0024588176,0.17898767,0.09137517,0.0263081,0.016281856,0.64520544],"study_design_scores_gemma":[0.0006336671,0.004068412,0.020948747,0.00037131787,0.00034471127,0.0003293687,0.0018746355,0.72066516,0.18980941,0.013525592,0.047201376,0.00022757378],"about_ca_topic_score_codex":0.003304685,"about_ca_topic_score_gemma":0.0024414617,"teacher_disagreement_score":0.009820661,"about_ca_system_score_codex":0.00043305216,"about_ca_system_score_gemma":0.0006125511,"threshold_uncertainty_score":0.032853425},"labels":[],"label_agreement":null},{"id":"W4402053681","doi":"10.1007/978-3-031-63276-1_21","title":"Extended Reality in Civil Infrastructure: A Comprehensive Review","year":2024,"lang":"en","type":"review","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia; Kelowna General Hospital","funders":"","keywords":"Civil infrastructure; Environmental planning; Political science; Engineering ethics; Geography; Civil engineering; Engineering","score_opus":0.019695725200248433,"score_gpt":0.27828659635095554,"score_spread":0.2585908711507071,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402053681","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000058907328,0.99929726,0.00009870409,0.000118672746,0.00008934673,0.0000039817414,0.000021039117,0.0000035660455,0.0003085758],"genre_scores_gemma":[0.00035635597,0.99914074,0.00016212888,0.00013424392,0.000070953196,0.0000036356919,0.000027741135,0.0000013674734,0.00010266135],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995542,0.000088065586,0.000083712985,0.000080761296,0.00015512505,0.000038041144],"domain_scores_gemma":[0.9980798,0.0012108651,0.00019403841,0.00004276265,0.0003919852,0.000080548234],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018397148,0.001032321,0.0025058328,0.00404876,0.00025427807,0.001739818,0.0013108474,0.0015487478,0.0048009343],"category_scores_gemma":[0.002766205,0.00059229234,0.0010501072,0.0052696806,0.0006811107,0.003005237,0.001290501,0.001392925,0.0015624274],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008035069,0.000069270456,0.00029980097,0.078981765,0.00026468624,0.00016172201,0.00010215547,0.0004556929,0.00062590884,0.0036773705,0.03279456,0.88248664],"study_design_scores_gemma":[0.00005336348,0.00014766525,0.0018223604,0.034666214,0.00089436676,0.00090694864,0.00021248411,0.00019482002,0.0003956452,0.00222696,0.9584136,0.000065579006],"about_ca_topic_score_codex":0.0024835616,"about_ca_topic_score_gemma":0.0056309165,"teacher_disagreement_score":0.0048009343,"about_ca_system_score_codex":0.0007427768,"about_ca_system_score_gemma":0.0028211088,"threshold_uncertainty_score":0.01606077},"labels":[],"label_agreement":null},{"id":"W4402057467","doi":"10.1061/9780784485569.057","title":"Gravity Siphon Design Best Practices","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Manitoba Hydro; University of Victoria; Winnipeg Regional Health Authority","funders":"","keywords":"Siphon (mollusc); Computer science","score_opus":0.037473850241976955,"score_gpt":0.2721665286916353,"score_spread":0.23469267844965835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402057467","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015889276,0.0040518264,0.74407935,0.0041470053,0.00051178725,0.00060438283,0.0006828634,0.0057346486,0.2242989],"genre_scores_gemma":[0.17502134,0.007133288,0.7607953,0.00069105206,0.00011913981,0.00064483203,0.0013201588,0.0019396113,0.05233537],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99333924,0.0015388519,0.00050011097,0.00053520355,0.0036271147,0.00045961174],"domain_scores_gemma":[0.9963967,0.00052955403,0.00016075865,0.00086510787,0.0017933727,0.0002546235],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005912086,0.0021450417,0.0006925688,0.0039245193,0.0016411414,0.0062942044,0.0047685127,0.0029630542,0.019681253],"category_scores_gemma":[0.0071460092,0.0012001467,0.0011591116,0.0027208494,0.002164188,0.005027104,0.003989049,0.0018079652,0.007685105],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012452464,0.00029253514,0.0027330108,0.0020493877,0.000080970945,0.00069139176,0.0041139503,0.059081808,0.014710827,0.20941857,0.050433945,0.656269],"study_design_scores_gemma":[0.00004890784,0.00023106518,0.0021496385,0.001815227,0.000094668925,0.0012333828,0.002773791,0.040161997,0.015253924,0.08578228,0.85027736,0.00017775124],"about_ca_topic_score_codex":0.0042207516,"about_ca_topic_score_gemma":0.009761247,"teacher_disagreement_score":0.019681253,"about_ca_system_score_codex":0.0030112453,"about_ca_system_score_gemma":0.003567874,"threshold_uncertainty_score":0.065840304},"labels":[],"label_agreement":null},{"id":"W4402131202","doi":"10.3390/buildings14092738","title":"A Hybrid Decision Support System for Partition Walls","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Partition (number theory); Decision support system; Computer science; Systems engineering; Materials science; Engineering; Artificial intelligence; Mathematics; Combinatorics","score_opus":0.00806408844176938,"score_gpt":0.2227480292048036,"score_spread":0.21468394076303424,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402131202","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034836154,0.00016454946,0.9357918,0.0004709638,0.00011624145,0.00054838107,0.0016762537,0.018395929,0.007999751],"genre_scores_gemma":[0.32685593,0.00020675258,0.66389984,0.00025659415,0.00006565569,0.00083694153,0.002571419,0.0002925667,0.0050143017],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99860305,0.00040200542,0.00021596807,0.00027813241,0.0004188577,0.00008195449],"domain_scores_gemma":[0.9968766,0.001833128,0.00022767125,0.0003341209,0.0005612119,0.00016723092],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002732566,0.0008853665,0.00084316643,0.0015905123,0.0007347262,0.0034834128,0.0017953662,0.0012786412,0.011190402],"category_scores_gemma":[0.0067218463,0.0004049165,0.00083200133,0.0010722486,0.00044613585,0.0021495486,0.0021566614,0.000899869,0.0026334794],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0021253512,0.0008588976,0.0075677224,0.00071568764,0.00034065422,0.0012773613,0.0012031004,0.29147428,0.019923931,0.046253018,0.022364983,0.605895],"study_design_scores_gemma":[0.00015624311,0.00017749668,0.0006443692,0.00007916513,0.00007293325,0.00017204767,0.00018047867,0.9581871,0.0056959637,0.012500273,0.022073027,0.00006089997],"about_ca_topic_score_codex":0.0022751205,"about_ca_topic_score_gemma":0.0021110957,"teacher_disagreement_score":0.011190402,"about_ca_system_score_codex":0.0007105583,"about_ca_system_score_gemma":0.0015157337,"threshold_uncertainty_score":0.03743565},"labels":[],"label_agreement":null},{"id":"W4402135512","doi":"10.1007/978-3-031-61527-6","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 10","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Environmental ethics; Engineering ethics; Library science; Engineering; Law; Computer science; Philosophy; Thermodynamics; Physics","score_opus":0.005432970205725795,"score_gpt":0.1779182677958861,"score_spread":0.1724852975901603,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402135512","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031211984,0.017863415,0.0037624717,0.027223809,0.06043617,0.0001831502,0.0060168696,0.0008851808,0.88050765],"genre_scores_gemma":[0.0035866043,0.0046890937,0.0009229116,0.0006261394,0.000811748,0.000026265292,0.001989939,0.00019958203,0.98714775],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985159,0.000077839715,0.000023536435,0.00007705621,0.0010941917,0.00021147812],"domain_scores_gemma":[0.9978102,0.0000724025,0.00002244656,0.0000536467,0.0015692255,0.00047205453],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015649504,0.0012525986,0.0009222118,0.0018731313,0.002641781,0.0054296954,0.0013969437,0.001969983,0.29420233],"category_scores_gemma":[0.001574864,0.00046679782,0.0005248447,0.002358912,0.0010329433,0.0014930108,0.0018527174,0.0019789264,0.10287802],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001756268,0.000020377356,0.000104296596,0.000043658903,0.0000023507637,0.00001528161,0.000023270451,0.00008803576,0.00021055657,0.0012558564,0.97183347,0.026385356],"study_design_scores_gemma":[0.000003516478,0.000005465909,0.000614569,0.000040803516,0.0000035743149,0.000013337408,0.000093616065,0.0001547558,0.00015642302,0.00052016095,0.99838734,0.0000063959533],"about_ca_topic_score_codex":0.45309764,"about_ca_topic_score_gemma":0.73847383,"teacher_disagreement_score":0.9919789,"about_ca_system_score_codex":0.008021087,"about_ca_system_score_gemma":0.02610286,"threshold_uncertainty_score":0.9842048},"labels":[],"label_agreement":null},{"id":"W4402148723","doi":"10.1061/jcemd4.coeng-14837","title":"Critical Review of Virtual Reality Applications in Offsite Construction Research","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":9,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Virtual reality; Computer science; Architectural engineering; Human–computer interaction; Construction engineering; Engineering","score_opus":0.02029656381457495,"score_gpt":0.29956095905543323,"score_spread":0.2792643952408583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402148723","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00053525687,0.9932066,0.0007789015,0.0024251505,0.0010842845,0.000409369,0.0001749827,0.000013652728,0.0013717592],"genre_scores_gemma":[0.00696879,0.98763055,0.0021551906,0.0015634035,0.00048492392,0.00072675204,0.00017881594,0.00001582276,0.00027571907],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.96009296,0.01727591,0.013150406,0.0014378708,0.0074607595,0.0005820534],"domain_scores_gemma":[0.8036264,0.1397441,0.014559816,0.0033669064,0.037537295,0.0011653769],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03469009,0.0014662176,0.0037133428,0.0339988,0.0015523664,0.004927977,0.002683501,0.0032334016,0.0051864837],"category_scores_gemma":[0.1396601,0.0012463186,0.0044960505,0.022880532,0.002305486,0.0050738496,0.002954704,0.0023808358,0.0009935205],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016354785,0.000043773874,0.00063742173,0.6662847,0.0013105302,0.00033443564,0.00172747,0.00029730104,0.0005660454,0.0047852383,0.017695105,0.30615452],"study_design_scores_gemma":[0.000041417654,0.00013658399,0.0018483673,0.7916525,0.0035810901,0.0004175072,0.0012384802,0.00012625173,0.00034821345,0.0017487751,0.19881035,0.00005044637],"about_ca_topic_score_codex":0.008358485,"about_ca_topic_score_gemma":0.017370267,"teacher_disagreement_score":0.03469009,"about_ca_system_score_codex":0.0080008255,"about_ca_system_score_gemma":0.03200137,"threshold_uncertainty_score":0.18346095},"labels":[],"label_agreement":null},{"id":"W4402148851","doi":"10.1007/978-3-031-61527-6_20","title":"Evaluation of Perforated Steel Tubes for Use as an Internal Frame and Partial Rebar Replacement in Precast Concrete Wall Panels","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Rebar; Structural engineering; Materials science; Frame (networking); Steel frame; Composite material; Engineering; Mechanical engineering","score_opus":0.02410924791749763,"score_gpt":0.24607262689649112,"score_spread":0.2219633789789935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402148851","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9918715,0.0004047512,0.0033513224,0.000020222085,0.00002842588,0.00005729867,0.00025849612,0.00006746439,0.003940582],"genre_scores_gemma":[0.9928358,0.00021941063,0.0028337024,0.000006532044,0.000004097043,0.000021855718,0.00022701884,0.000035630077,0.0038158335],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99926406,0.0001449233,0.00002083017,0.00007218235,0.00042517504,0.000072809074],"domain_scores_gemma":[0.99931455,0.00017574376,0.000061627,0.000045627065,0.00034940537,0.000053101638],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006621668,0.00059829146,0.0003530567,0.00060222094,0.0004361273,0.0006336947,0.000823188,0.0007683409,0.0039937687],"category_scores_gemma":[0.0012260637,0.00024314011,0.0003977887,0.00042780413,0.0003819671,0.00048307827,0.0002926524,0.00025298845,0.00058427197],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00329721,0.0007477166,0.0075445543,0.0005570361,0.00004410123,0.0009005651,0.00047358838,0.065232106,0.8237153,0.001159927,0.0016250028,0.094702885],"study_design_scores_gemma":[0.00012548604,0.012890519,0.055801842,0.00010138752,0.00028708592,0.0006048522,0.0007824201,0.06677534,0.85140264,0.0004983774,0.010653178,0.00007687277],"about_ca_topic_score_codex":0.0020549735,"about_ca_topic_score_gemma":0.005178956,"teacher_disagreement_score":0.0039937687,"about_ca_system_score_codex":0.00058267696,"about_ca_system_score_gemma":0.0005715267,"threshold_uncertainty_score":0.0133605},"labels":[],"label_agreement":null},{"id":"W4402149055","doi":"10.1007/978-3-031-61539-9","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 13","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering ethics; Engineering; Environmental science; Environmental ethics; Library science; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005278546757023811,"score_gpt":0.1765926982219578,"score_spread":0.171314151464934,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402149055","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031067834,0.01678135,0.0034686003,0.02646863,0.057795003,0.00018948354,0.0060888026,0.0008660472,0.88523537],"genre_scores_gemma":[0.0034324364,0.0044363504,0.0008388676,0.00057753193,0.0007602679,0.000025293346,0.0018363514,0.00019234905,0.9879005],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99853957,0.00007097349,0.000023543189,0.00007915355,0.0010762629,0.00021042694],"domain_scores_gemma":[0.9978091,0.00006510575,0.000020820562,0.00005274617,0.0016033887,0.0004488687],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014876244,0.0012144262,0.00092977553,0.001918359,0.0028900332,0.005681221,0.001383987,0.0018532559,0.29745972],"category_scores_gemma":[0.0015969943,0.00045896237,0.00053147017,0.002528444,0.001066669,0.00143006,0.0018180523,0.001863386,0.105417885],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016787353,0.000018913737,0.000112817506,0.00004219942,0.0000024192045,0.000015795893,0.000024276622,0.00008562257,0.00019717142,0.0013103795,0.972011,0.026162485],"study_design_scores_gemma":[0.0000034879201,0.000005105564,0.00062796817,0.00003982204,0.0000035509042,0.000013069744,0.00009835186,0.00014287392,0.00014904632,0.0005083798,0.9984022,0.0000063302437],"about_ca_topic_score_codex":0.49717754,"about_ca_topic_score_gemma":0.76407444,"teacher_disagreement_score":0.99123204,"about_ca_system_score_codex":0.00876797,"about_ca_system_score_gemma":0.028821694,"threshold_uncertainty_score":0.9951019},"labels":[],"label_agreement":null},{"id":"W4402189015","doi":"10.32920/26883484.v1","title":"Improving Circularity in Ontario Building Design Through Design for Disassembly Principles","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Design elements and principles; Computer science; Engineering; Systems engineering","score_opus":0.06975336541624752,"score_gpt":0.26031609712765774,"score_spread":0.19056273171141022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402189015","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76020306,0.0017337551,0.069777824,0.00520536,0.000050543356,0.0004625228,0.00022234074,0.0003950233,0.16194962],"genre_scores_gemma":[0.92587876,0.0007769561,0.050106138,0.0001382442,0.000005804887,0.00011581841,0.00013226776,0.00005452768,0.022791408],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9961701,0.0012106565,0.000140817,0.0002759025,0.0018418173,0.00036060496],"domain_scores_gemma":[0.9969902,0.000994044,0.0003799717,0.00030957808,0.0010399803,0.00028626024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044523156,0.00032983153,0.00021205109,0.0010527731,0.0045122383,0.0029627245,0.00077698723,0.0005225739,0.0040517184],"category_scores_gemma":[0.0058709322,0.0004315583,0.0002257142,0.00156501,0.004143482,0.0012366899,0.0026577131,0.00048998086,0.000291663],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038290684,0.000459924,0.06630193,0.0013251744,0.000039124752,0.00083349727,0.1209362,0.032171387,0.023736948,0.10047528,0.0145992655,0.6387384],"study_design_scores_gemma":[0.00007575534,0.0006733776,0.1506897,0.0007323958,0.00008914829,0.0006152479,0.08740171,0.035303492,0.022251762,0.02678404,0.6751805,0.00020287358],"about_ca_topic_score_codex":0.54656684,"about_ca_topic_score_gemma":0.84877795,"teacher_disagreement_score":0.45343316,"about_ca_system_score_codex":0.037616696,"about_ca_system_score_gemma":0.038270414,"threshold_uncertainty_score":0.912207},"labels":[],"label_agreement":null},{"id":"W4402192846","doi":"10.32920/26883484","title":"Improving Circularity in Ontario Building Design Through Design for Disassembly Principles","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Design elements and principles; Computer science; Engineering; Systems engineering; Construction engineering","score_opus":0.06975336541624752,"score_gpt":0.26031609712765774,"score_spread":0.19056273171141022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402192846","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.76020306,0.0017337551,0.069777824,0.00520536,0.000050543356,0.0004625228,0.00022234074,0.0003950233,0.16194962],"genre_scores_gemma":[0.92587876,0.0007769561,0.050106138,0.0001382442,0.000005804887,0.00011581841,0.00013226776,0.00005452768,0.022791408],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9961701,0.0012106565,0.000140817,0.0002759025,0.0018418173,0.00036060496],"domain_scores_gemma":[0.9969902,0.000994044,0.0003799717,0.00030957808,0.0010399803,0.00028626024],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0044523156,0.00032983153,0.00021205109,0.0010527731,0.0045122383,0.0029627245,0.00077698723,0.0005225739,0.0040517184],"category_scores_gemma":[0.0058709322,0.0004315583,0.0002257142,0.00156501,0.004143482,0.0012366899,0.0026577131,0.00048998086,0.000291663],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00038290684,0.000459924,0.06630193,0.0013251744,0.000039124752,0.00083349727,0.1209362,0.032171387,0.023736948,0.10047528,0.0145992655,0.6387384],"study_design_scores_gemma":[0.00007575534,0.0006733776,0.1506897,0.0007323958,0.00008914829,0.0006152479,0.08740171,0.035303492,0.022251762,0.02678404,0.6751805,0.00020287358],"about_ca_topic_score_codex":0.54656684,"about_ca_topic_score_gemma":0.84877795,"teacher_disagreement_score":0.45343316,"about_ca_system_score_codex":0.037616696,"about_ca_system_score_gemma":0.038270414,"threshold_uncertainty_score":0.912207},"labels":[],"label_agreement":null},{"id":"W4402289902","doi":"10.1016/j.autcon.2024.105731","title":"Automated safety and practicality enhancement of lift plans in modular construction","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Lift (data mining); Modular design; Engineering; Construction engineering; Modular construction; Computer science; Architectural engineering; Engineering drawing; Civil engineering; Systems engineering; Transport engineering; Data mining; Programming language","score_opus":0.0068668339688412955,"score_gpt":0.23929298330853352,"score_spread":0.23242614933969222,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402289902","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28274548,0.000143825,0.7050623,0.00014759181,0.00002686993,0.00014093291,0.0000901974,0.0013536859,0.010289081],"genre_scores_gemma":[0.9298384,0.000051216244,0.068801574,0.000012157385,0.000007880946,0.000034810026,0.00010561195,0.00006859951,0.0010797943],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998589,0.00048312714,0.000039866314,0.00014799793,0.0006001177,0.00013991918],"domain_scores_gemma":[0.9979424,0.00081949175,0.00021597487,0.0005135274,0.00043967032,0.000068993126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012194152,0.0005676857,0.0003870237,0.00077353127,0.00048808995,0.00089562795,0.00057362864,0.00045277164,0.0026679162],"category_scores_gemma":[0.003705777,0.00033422123,0.00052909757,0.0003922846,0.00094014325,0.0011444625,0.0016320803,0.00061622995,0.00043414542],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010921994,0.00041591912,0.006668759,0.00026430347,0.000059976,0.00039628358,0.0009955254,0.4583197,0.07626808,0.04908855,0.0017410405,0.40468958],"study_design_scores_gemma":[0.000033401786,0.00032843652,0.0036340083,0.000027596778,0.000046009478,0.00017427401,0.00018895195,0.9347346,0.038619578,0.019244703,0.0029449547,0.00002342606],"about_ca_topic_score_codex":0.0013011823,"about_ca_topic_score_gemma":0.0012587137,"teacher_disagreement_score":0.0026679162,"about_ca_system_score_codex":0.00045838763,"about_ca_system_score_gemma":0.0012080162,"threshold_uncertainty_score":0.008925021},"labels":[],"label_agreement":null},{"id":"W4402444632","doi":"10.1139/cjce-2024-0180","title":"Multi-objective optimization and simulation of earthwork equipment configuration in the upper reservoir of a pumped storage power station","year":2024,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Department of Education of Guizhou Province; Guizhou Science and Technology Department","keywords":"Earthworks; Environmental science; Power station; Power (physics); Engineering; Hydro power; Petroleum engineering; Civil engineering; Environmental engineering; Electrical engineering; Geotechnical engineering","score_opus":0.008407861788444949,"score_gpt":0.2096204659611881,"score_spread":0.20121260417274317,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402444632","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9631508,0.000080475555,0.031703126,0.00014437191,0.00002583198,0.00006105412,0.00027461897,0.000088261535,0.004471431],"genre_scores_gemma":[0.993454,0.00004069555,0.0055265166,0.000011775417,0.0000021303997,0.000048881997,0.00009466196,0.0000073533743,0.00081395055],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997501,0.000086916945,0.000011426864,0.000034170484,0.000032133245,0.00008524371],"domain_scores_gemma":[0.99926406,0.0004674569,0.000079201985,0.000027272956,0.00008019079,0.00008184021],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069787947,0.0006287681,0.0008976062,0.0006069917,0.0006025884,0.001020006,0.0006721116,0.0012309479,0.0021400352],"category_scores_gemma":[0.0011497627,0.0004819094,0.0009857457,0.00069934316,0.0006219551,0.0005443834,0.0005740517,0.00085300626,0.000091231326],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021524651,0.000022531282,0.0004950363,0.00000729567,0.000004822792,0.000023911638,0.0000051279785,0.9987453,0.00018611563,0.0001233355,0.000018972627,0.00034599466],"study_design_scores_gemma":[0.0000069164107,0.000018548344,0.00023468993,0.0000012534068,0.0000030559547,0.0000017403789,0.000014018314,0.99948347,0.0001562652,0.000053827705,0.00002401417,0.0000021563735],"about_ca_topic_score_codex":0.034442596,"about_ca_topic_score_gemma":0.019719152,"teacher_disagreement_score":0.034442596,"about_ca_system_score_codex":0.0012722198,"about_ca_system_score_gemma":0.0015432972,"threshold_uncertainty_score":0.06848425},"labels":[],"label_agreement":null},{"id":"W4402477089","doi":"10.11159/icceia24.113","title":"Digital Twin Applications In Construction: Creation And Interaction Of Virtual And Data LayersDigital Twin Applications In Construction: Creation And Interaction Of Virtual And Data Layers","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Human–computer interaction","score_opus":0.01719106908412851,"score_gpt":0.27192052524229215,"score_spread":0.25472945615816367,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402477089","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06457679,0.0017749541,0.8346863,0.0013020143,0.000446106,0.00019384356,0.00009009475,0.0014161781,0.09551379],"genre_scores_gemma":[0.55252975,0.0021353723,0.40847635,0.00031914943,0.00010673328,0.00019913055,0.00018160237,0.0004984687,0.035553478],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99792385,0.0006573558,0.00013128822,0.00016947108,0.00088218227,0.00023572188],"domain_scores_gemma":[0.99882215,0.00030879342,0.00006893143,0.0003163328,0.0002660121,0.00021781206],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025281853,0.0005040764,0.00036011753,0.002140744,0.0015934372,0.0058774822,0.0011340431,0.0010855147,0.0035592134],"category_scores_gemma":[0.0031848836,0.0006049209,0.00062446285,0.0017572012,0.0026869667,0.006488675,0.008645179,0.0015447873,0.0008073997],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013622356,0.0001102827,0.005649415,0.00045125998,0.000042537482,0.0009868054,0.008502605,0.006398018,0.020344952,0.621594,0.006593796,0.32919022],"study_design_scores_gemma":[0.000034307417,0.00022599185,0.008662018,0.00073659036,0.00014449169,0.0031302522,0.007581394,0.057890177,0.03886737,0.21252501,0.6699934,0.0002090771],"about_ca_topic_score_codex":0.0018226512,"about_ca_topic_score_gemma":0.002652778,"teacher_disagreement_score":0.0058774822,"about_ca_system_score_codex":0.0012030527,"about_ca_system_score_gemma":0.0019624776,"threshold_uncertainty_score":0.013370514},"labels":[],"label_agreement":null},{"id":"W4402477124","doi":"10.11159/icceia24.131","title":"Assessment and Retrofitting Of a Multi-Storey Reinforced Concrete Building","year":2024,"lang":"en","type":"article","venue":"Proceedings of the World Congress on New Technologies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Retrofitting; Reinforced concrete; Architectural engineering; Construction engineering; Civil engineering; Computer science; Structural engineering; Engineering","score_opus":0.013034587527881003,"score_gpt":0.2567087066839989,"score_spread":0.24367411915611792,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402477124","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99623126,0.000021173835,0.002582928,0.000006785375,0.0000018533277,0.000014953309,0.000039147173,0.000022162496,0.0010795885],"genre_scores_gemma":[0.99800867,0.00002643496,0.001527537,0.0000015886664,0.0000010286717,0.000005034938,0.000032479016,0.0000028125635,0.00039438004],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9996636,0.00006928581,0.000017505954,0.00004381908,0.00016241852,0.000043348566],"domain_scores_gemma":[0.9997067,0.00006176907,0.000085352185,0.00004083823,0.00007988938,0.000025551137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004972761,0.00046845977,0.0002511844,0.000959692,0.00022159443,0.00056716107,0.00034037745,0.0005514149,0.0007901411],"category_scores_gemma":[0.00048326346,0.00023760718,0.00033038258,0.00041874457,0.00030918585,0.0003145129,0.00046774812,0.00017499729,0.00021307498],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005012896,0.00027569916,0.14105862,0.00018882935,0.000097097334,0.0020025326,0.00072577986,0.60782146,0.17595181,0.0010626428,0.00025577558,0.07005846],"study_design_scores_gemma":[0.000011298982,0.0018895313,0.41901952,0.000045521483,0.00016458677,0.00083783735,0.0011356045,0.5074199,0.06744583,0.00033587776,0.0016448266,0.000049631108],"about_ca_topic_score_codex":0.002798443,"about_ca_topic_score_gemma":0.0063824123,"teacher_disagreement_score":0.002798443,"about_ca_system_score_codex":0.00045982876,"about_ca_system_score_gemma":0.0003070854,"threshold_uncertainty_score":0.0055642724},"labels":[],"label_agreement":null},{"id":"W4402481486","doi":"10.1201/9781003483755-278","title":"A framework for an integrated &amp; digitally-supported bridge management","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Bridge (graph theory); Computer science; Engineering; Medicine; Internal medicine","score_opus":0.02841244653182656,"score_gpt":0.25189188598605405,"score_spread":0.2234794394542275,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402481486","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013681463,0.00085139356,0.9450282,0.0013925997,0.00011431787,0.00015459787,0.00013392519,0.00057416974,0.050382633],"genre_scores_gemma":[0.03221814,0.0010839155,0.9508128,0.0002592585,0.000067339046,0.00032986508,0.00033071684,0.00012338342,0.01477457],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9992279,0.00027091274,0.00005796857,0.00012314104,0.00025267384,0.000067405424],"domain_scores_gemma":[0.9996648,0.000127241,0.000025179172,0.00006797981,0.000065962544,0.000048887126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018600762,0.0009324659,0.00040214215,0.0014409471,0.0011503098,0.004507894,0.0027502573,0.002017528,0.0074458066],"category_scores_gemma":[0.0011822438,0.0005264881,0.0011443463,0.0013333553,0.0026373987,0.0034614278,0.0035169518,0.0022191014,0.0021303846],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000033704243,0.000025418467,0.000080448284,0.00007523375,0.00000565381,0.00010606169,0.00031567266,0.009846255,0.0009230341,0.9608817,0.0029517561,0.02478539],"study_design_scores_gemma":[0.000012203917,0.000044417386,0.00017327616,0.00040547614,0.000016954922,0.00037545373,0.00037000692,0.07769313,0.0011556041,0.57018816,0.3495348,0.000030515717],"about_ca_topic_score_codex":0.005104681,"about_ca_topic_score_gemma":0.004953398,"teacher_disagreement_score":0.0074458066,"about_ca_system_score_codex":0.0021737982,"about_ca_system_score_gemma":0.0025155114,"threshold_uncertainty_score":0.024908721},"labels":[],"label_agreement":null},{"id":"W4402534755","doi":"10.1007/978-3-031-61511-5","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 7","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering; Library science; Environmental ethics; Engineering ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.0053620730816654515,"score_gpt":0.17743084315095725,"score_spread":0.1720687700692918,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402534755","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003082269,0.017346147,0.0033152215,0.026241165,0.061972566,0.00019208936,0.0053246706,0.00082258217,0.8817033],"genre_scores_gemma":[0.0034705515,0.004818843,0.0008738072,0.00065621757,0.00088939065,0.000026930638,0.0018937746,0.00018741406,0.987183],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99848396,0.00007585668,0.000024336687,0.00007783196,0.0011272219,0.0002108471],"domain_scores_gemma":[0.99772555,0.000069722904,0.000022128273,0.000053316096,0.0016442598,0.00048503466],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014899026,0.0011961448,0.0009009269,0.0018869909,0.002625014,0.005409352,0.0013297582,0.0019263707,0.30505675],"category_scores_gemma":[0.0015720162,0.00045012613,0.00053927087,0.0023870948,0.0010072226,0.0013868542,0.0018038763,0.0019038554,0.11449165],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017353368,0.000021026512,0.000112520785,0.000046812555,0.0000025299123,0.00001728578,0.000023307588,0.000085653315,0.0002353624,0.0012456193,0.97072756,0.02746506],"study_design_scores_gemma":[0.0000034840095,0.000005543971,0.00063194754,0.000042667787,0.0000036168522,0.000014611057,0.000091619004,0.00013586953,0.00015044968,0.0004747546,0.998439,0.0000063572606],"about_ca_topic_score_codex":0.42179006,"about_ca_topic_score_gemma":0.7081057,"teacher_disagreement_score":0.57820994,"about_ca_system_score_codex":0.007488867,"about_ca_system_score_gemma":0.025536522,"threshold_uncertainty_score":0.9912522},"labels":[],"label_agreement":null},{"id":"W4402602403","doi":"10.1007/978-3-031-61499-6_26","title":"Integrating Building Information Modeling (BIM), GIS, and Circular Economy (CE) for the Construction and Deconstruction Waste Based on Construction Methods at the Conceptual Design Stage of Buildings","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Deconstruction (building); Building information modeling; Circular economy; Architectural engineering; Construction engineering; Conceptual design; Civil engineering; Engineering; Waste management; Mechanical engineering; Operations management","score_opus":0.013739701824206401,"score_gpt":0.2259225648366686,"score_spread":0.2121828630124622,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602403","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.009461132,0.005457114,0.8202231,0.0013671594,0.00024027632,0.00008383409,0.00014564813,0.00069150794,0.1623301],"genre_scores_gemma":[0.13692984,0.009952255,0.77753824,0.00028760615,0.0001300312,0.00017981238,0.0006071493,0.00058777386,0.07378737],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993818,0.0001923502,0.000026989568,0.000049804537,0.00031088025,0.000038173246],"domain_scores_gemma":[0.9994931,0.0003049463,0.000017599465,0.00008724253,0.00007666638,0.000020399018],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012915166,0.00082566263,0.00047039735,0.00222815,0.00056898006,0.0033717107,0.001083626,0.0008188581,0.0055312156],"category_scores_gemma":[0.0012199787,0.0005110345,0.000717472,0.0036582767,0.0017252784,0.004334065,0.002238281,0.001614487,0.0013855373],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013210319,0.000047931586,0.000626661,0.00027689978,0.00001497872,0.00009888087,0.0006674278,0.016112687,0.002009266,0.6722166,0.0067128153,0.3012027],"study_design_scores_gemma":[0.000006971266,0.000050257157,0.0015268115,0.00044213416,0.000047550537,0.00047555685,0.0010985315,0.13038664,0.0087155085,0.50215006,0.3550577,0.000042189236],"about_ca_topic_score_codex":0.0026790663,"about_ca_topic_score_gemma":0.0067308266,"teacher_disagreement_score":0.0055312156,"about_ca_system_score_codex":0.0012817517,"about_ca_system_score_gemma":0.0017433264,"threshold_uncertainty_score":0.018503785},"labels":[],"label_agreement":null},{"id":"W4402602549","doi":"10.1007/978-3-031-61499-6_29","title":"Design for Manufacturing and Assembly (DfMA) in Off-Site Construction (OSC) and On-Site Construction","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canam Group (Canada); École de Technologie Supérieure","funders":"","keywords":"Engineering; Manufacturing engineering; Construction engineering","score_opus":0.0089936592377682,"score_gpt":0.1941702166550414,"score_spread":0.18517655741727318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602549","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008546346,0.019700691,0.17992523,0.0013069262,0.0016309686,0.000075037824,0.000101009195,0.00031440353,0.7883993],"genre_scores_gemma":[0.1175685,0.01235604,0.10024891,0.00037880693,0.00040423163,0.00014716716,0.00028601562,0.000344512,0.7682658],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995259,0.00015216475,0.000019966603,0.000059549315,0.00019385625,0.000048503276],"domain_scores_gemma":[0.99984515,0.000066759836,0.000008169338,0.000032520384,0.000031211173,0.000016064098],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006768971,0.00073565205,0.0003484878,0.00081771816,0.0008852422,0.002158384,0.0007813691,0.00095837074,0.022483138],"category_scores_gemma":[0.0005112489,0.0005069419,0.00041483602,0.0009900413,0.001458684,0.000954176,0.0012867894,0.0010620017,0.00446393],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028866836,0.000053004842,0.00058151426,0.00026783132,0.0000068804884,0.000094462426,0.00084860175,0.009152272,0.0022814728,0.45909777,0.048048865,0.4795385],"study_design_scores_gemma":[0.000003939565,0.000060608738,0.001198361,0.0002230608,0.0000052198166,0.0003938851,0.00041102993,0.006422711,0.0012201712,0.091750175,0.89829797,0.000012890851],"about_ca_topic_score_codex":0.0026285744,"about_ca_topic_score_gemma":0.007862273,"teacher_disagreement_score":0.022483138,"about_ca_system_score_codex":0.0015340165,"about_ca_system_score_gemma":0.0011351325,"threshold_uncertainty_score":0.07521361},"labels":[],"label_agreement":null},{"id":"W4402602915","doi":"10.1007/978-3-031-61499-6","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 4","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering ethics; Environmental ethics; Library science; Engineering; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.0053885573219292675,"score_gpt":0.17753364734223762,"score_spread":0.17214509002030834,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402602915","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0033434888,0.0192743,0.003607041,0.029450685,0.06424202,0.0001980469,0.0060434076,0.0008195826,0.8730214],"genre_scores_gemma":[0.0034354737,0.004657345,0.000855394,0.00064218364,0.00082151504,0.000025379968,0.0018558186,0.00018219999,0.9875246],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998572,0.00007162659,0.000022789764,0.00007500607,0.0010554169,0.00020325027],"domain_scores_gemma":[0.9979206,0.00006677535,0.000021162523,0.000050939823,0.0015060361,0.00043446763],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014836362,0.0012256778,0.00089430116,0.001871921,0.002686135,0.0053900764,0.0013286999,0.001954049,0.29734567],"category_scores_gemma":[0.0015450683,0.00045844924,0.0005353178,0.0023926357,0.0010096398,0.0014203084,0.0018327076,0.0019448356,0.103849895],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018094854,0.000019697021,0.00011250679,0.00004507253,0.0000025232632,0.000016432918,0.000024376868,0.00009507147,0.00022701347,0.0012222324,0.97165424,0.026562812],"study_design_scores_gemma":[0.0000034848122,0.0000052243877,0.00062912947,0.000040373,0.0000036834554,0.000013559317,0.00009311085,0.00014215946,0.00015291754,0.0004971091,0.99841285,0.000006352542],"about_ca_topic_score_codex":0.4653555,"about_ca_topic_score_gemma":0.749733,"teacher_disagreement_score":0.99198407,"about_ca_system_score_codex":0.0080159325,"about_ca_system_score_gemma":0.026928358,"threshold_uncertainty_score":0.99472034},"labels":[],"label_agreement":null},{"id":"W4402603044","doi":"10.1007/978-3-031-61499-6_11","title":"Predicting Change Order Magnitude in Construction Projects—A Machine Learning Approach","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Order (exchange); Magnitude (astronomy); Computer science; Physics; Economics","score_opus":0.012265776825731245,"score_gpt":0.1931519364204829,"score_spread":0.18088615959475166,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402603044","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5644122,0.0020582525,0.4186523,0.00072987325,0.00016580641,0.00013236068,0.0030573013,0.0014702046,0.009321655],"genre_scores_gemma":[0.9258586,0.0005483571,0.06637543,0.00004806012,0.000094986404,0.000075187025,0.002541471,0.000080531165,0.0043772347],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995708,0.00008982577,0.00003804565,0.00014345482,0.00010632532,0.00005160942],"domain_scores_gemma":[0.99812025,0.0013651879,0.00015101448,0.000105097046,0.00020871345,0.000049800194],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000878784,0.0007847968,0.00081641244,0.0028041787,0.00034364482,0.0013124414,0.0010015444,0.00093052397,0.0025747886],"category_scores_gemma":[0.0030735224,0.00043476166,0.0008202501,0.0026855806,0.00033803083,0.0013121339,0.00055427145,0.001205899,0.0009151685],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018958715,0.00040231348,0.0679566,0.00010504998,0.00011707007,0.00014408478,0.00009784864,0.4824212,0.0019825872,0.0030365307,0.0036876523,0.4398595],"study_design_scores_gemma":[0.0000034446946,0.000023936564,0.012063031,0.000009367902,0.000008732944,0.000021098173,0.00003742379,0.9841876,0.00036459818,0.0028792827,0.00039285398,0.000008531248],"about_ca_topic_score_codex":0.009333091,"about_ca_topic_score_gemma":0.014471357,"teacher_disagreement_score":0.009333091,"about_ca_system_score_codex":0.0007388252,"about_ca_system_score_gemma":0.0005087332,"threshold_uncertainty_score":0.018557549},"labels":[],"label_agreement":null},{"id":"W4402603215","doi":"10.1007/978-3-031-61499-6_21","title":"Toward a Decision Support System for a Toolbox Meeting Pertaining to Roofing Activities in Construction","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Toolbox; Computer science; Engineering; Architectural engineering; Systems engineering; Programming language","score_opus":0.010438058850786523,"score_gpt":0.20820445258236103,"score_spread":0.1977663937315745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402603215","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.031730138,0.000179929,0.8807141,0.00058143167,0.00017370765,0.000557326,0.001374275,0.06934064,0.0153483255],"genre_scores_gemma":[0.22202937,0.00022310503,0.74721146,0.0005191618,0.00011417302,0.0005325665,0.0035370064,0.001409069,0.024424136],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999332,0.00013278562,0.00007296848,0.00018247856,0.00022698713,0.00005268942],"domain_scores_gemma":[0.9989145,0.00048762767,0.00004709703,0.00011514243,0.0002719041,0.00016371065],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014496082,0.0007893378,0.0007439166,0.0011114045,0.0008881324,0.0030851497,0.0019112898,0.0016722447,0.017643612],"category_scores_gemma":[0.002600077,0.00043775674,0.000520969,0.0007212679,0.000344951,0.0017520989,0.0018195013,0.000929195,0.0076423],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017942179,0.0011370359,0.0080980975,0.00041588928,0.00016553632,0.001991659,0.0021181072,0.033599574,0.10028768,0.021309314,0.078690514,0.7503924],"study_design_scores_gemma":[0.00033022353,0.00045147116,0.00424591,0.00021524295,0.00027749062,0.0006561125,0.0010344468,0.7718516,0.07297088,0.015058231,0.13276061,0.00014774567],"about_ca_topic_score_codex":0.004026995,"about_ca_topic_score_gemma":0.003422146,"teacher_disagreement_score":0.017643612,"about_ca_system_score_codex":0.0005902582,"about_ca_system_score_gemma":0.0011320102,"threshold_uncertainty_score":0.059023738},"labels":[],"label_agreement":null},{"id":"W4402603629","doi":"10.1007/978-3-031-61499-6_7","title":"Barriers to the Implementation of Integrated Design Processes—The Case of the Construction Industry in Quebec, Canada","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Polytechnique Montréal; Université de Montréal","funders":"","keywords":"Business; Construction industry; Engineering; Construction engineering","score_opus":0.005989672180618978,"score_gpt":0.20059323040303867,"score_spread":0.1946035582224197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402603629","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7713158,0.0021330614,0.0055471263,0.017048968,0.00009390703,0.00028726563,0.00026833182,0.000113050526,0.20319253],"genre_scores_gemma":[0.97348017,0.00044276126,0.0015366524,0.0004962463,0.000005970315,0.00005678291,0.000085543776,0.000026893347,0.023868978],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9903307,0.0016660779,0.0002885713,0.0005281684,0.0030637842,0.004122729],"domain_scores_gemma":[0.98864925,0.0037354038,0.0007705377,0.00040956624,0.0044961334,0.0019391166],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00609318,0.0003770683,0.00045852046,0.001359529,0.017427241,0.012560565,0.0033047572,0.0030515722,0.0071956064],"category_scores_gemma":[0.0118532935,0.00064204144,0.00047825673,0.003683736,0.006552279,0.0023071328,0.004477198,0.0031885384,0.0005220347],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00043408907,0.00074082706,0.13717283,0.0007701344,0.00012938464,0.007813444,0.2104751,0.026543006,0.004459007,0.3366895,0.046106257,0.22866642],"study_design_scores_gemma":[0.00015643878,0.00025348002,0.28298333,0.0016406836,0.00016659031,0.00085212494,0.32899994,0.017519305,0.0016467313,0.015152198,0.35037255,0.00025658097],"about_ca_topic_score_codex":0.98830765,"about_ca_topic_score_gemma":0.99441177,"teacher_disagreement_score":0.15535343,"about_ca_system_score_codex":0.15535343,"about_ca_system_score_gemma":0.20276755,"threshold_uncertainty_score":0.9796703},"labels":[],"label_agreement":null},{"id":"W4402673781","doi":"10.1109/tem.2024.3461508","title":"Exploring the Challenges in Building Information Modeling (BIM) During the Design Phase: Evidence From Cross-Country Studies","year":2024,"lang":"en","type":"article","venue":"IEEE Transactions on Engineering Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université du Québec à Trois-Rivières","funders":"Conselho Nacional de Desenvolvimento Científico e Tecnológico; Coordenação de Aperfeiçoamento de Pessoal de Nível Superior","keywords":"Building information modeling; Phase (matter); Systems engineering; Engineering; Computer science; Business; Operations management","score_opus":0.10988166376211268,"score_gpt":0.2813967210592218,"score_spread":0.17151505729710914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402673781","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9728599,0.004404757,0.0041140136,0.0017997212,0.00004484513,0.00010907842,0.00008112895,0.000008917886,0.016577696],"genre_scores_gemma":[0.9937069,0.0031923694,0.0021696913,0.0003307507,0.0000075099924,0.00008345606,0.00006096995,0.0000161503,0.0004323102],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9542663,0.032199357,0.0025812762,0.00234572,0.00634053,0.0022668724],"domain_scores_gemma":[0.77427596,0.17284654,0.022870325,0.011301685,0.016416213,0.002289303],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06669695,0.00056994596,0.0008106078,0.003224375,0.0040605366,0.008029324,0.0016327004,0.0016583935,0.0026682536],"category_scores_gemma":[0.10452133,0.0011547155,0.000660562,0.0069480115,0.007747222,0.007941288,0.0074381214,0.0023578517,0.00038247],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021564338,0.0005671694,0.29048842,0.0034079643,0.00032387636,0.0019457749,0.55207133,0.0021076184,0.0010333804,0.020768093,0.0021650163,0.124905735],"study_design_scores_gemma":[0.000026336937,0.00033194074,0.16798049,0.0046992726,0.00016905567,0.0011959369,0.7708149,0.001271343,0.001634691,0.0040702843,0.047700435,0.00010532071],"about_ca_topic_score_codex":0.014714491,"about_ca_topic_score_gemma":0.03048503,"teacher_disagreement_score":0.06669695,"about_ca_system_score_codex":0.0042902,"about_ca_system_score_gemma":0.00605584,"threshold_uncertainty_score":0.3527314},"labels":[],"label_agreement":null},{"id":"W4402685554","doi":"10.1061/jcemd4.coeng-15141","title":"Defining Information Requirements for Off-Site Construction Management: An Industry Case Study from Canada","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of New Brunswick","funders":"","keywords":"Construction industry; Business; Construction engineering; Process management; Computer science; Operations management; Engineering","score_opus":0.006128696407340709,"score_gpt":0.2059419381125638,"score_spread":0.1998132417052231,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402685554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.94676346,0.00030035095,0.008694209,0.0023585914,0.00001593685,0.0010496713,0.00019643057,0.000046768208,0.040574573],"genre_scores_gemma":[0.97193414,0.00054103835,0.016908899,0.0003385289,0.000005558959,0.00018483755,0.0002727718,0.00003259547,0.00978167],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.99182457,0.002064578,0.00040094065,0.00042765983,0.0035317405,0.0017504689],"domain_scores_gemma":[0.98833305,0.004456374,0.00069878175,0.0004648912,0.005082473,0.000964442],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0062487666,0.0005035378,0.00035165812,0.0024965033,0.011121797,0.004918721,0.002121704,0.0018212203,0.0013653615],"category_scores_gemma":[0.010012766,0.00048395098,0.00038238958,0.0043877494,0.003433216,0.0013996182,0.0025802033,0.0015108638,0.00020489041],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035511598,0.0019715526,0.14687692,0.0009822217,0.000051117506,0.035950076,0.50903666,0.016179794,0.01857298,0.039714392,0.015830608,0.2144785],"study_design_scores_gemma":[0.000058597972,0.00038428884,0.098277465,0.00060328166,0.00005728861,0.0026977453,0.72340775,0.019252243,0.007617542,0.002413967,0.14506528,0.0001644995],"about_ca_topic_score_codex":0.92330337,"about_ca_topic_score_gemma":0.9600533,"teacher_disagreement_score":0.076696634,"about_ca_system_score_codex":0.06553403,"about_ca_system_score_gemma":0.08021946,"threshold_uncertainty_score":0.4754849},"labels":[],"label_agreement":null},{"id":"W4402826711","doi":"10.1007/978-3-031-61531-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 11","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Library science; Engineering ethics; Engineering; Environmental ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005424163390262451,"score_gpt":0.1772019640249913,"score_spread":0.17177780063472886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402826711","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003033641,0.01762149,0.003653107,0.027218616,0.060691938,0.0001868841,0.0061160964,0.0008585624,0.8806197],"genre_scores_gemma":[0.0034266282,0.004513189,0.0008481572,0.0005920403,0.00076869375,0.000025395904,0.0018914185,0.0001874956,0.9877471],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99849415,0.00007758544,0.000024356368,0.0000796763,0.0011094578,0.00021472346],"domain_scores_gemma":[0.99773693,0.00007249965,0.000022073851,0.00005510493,0.0016375862,0.00047573217],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015453729,0.0012344703,0.00092740665,0.0018785462,0.002841673,0.0056058965,0.0013429436,0.0019280355,0.2898208],"category_scores_gemma":[0.0016252819,0.00046816026,0.00052115595,0.0024331026,0.0010738244,0.0014678284,0.001850403,0.001941281,0.10189699],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017062937,0.000019252704,0.00011138547,0.00004298787,0.000002355987,0.000016031501,0.000024293522,0.00009100385,0.00019656005,0.0012991735,0.97208685,0.026093049],"study_design_scores_gemma":[0.0000032685023,0.000005157183,0.000597768,0.00003915836,0.0000033820274,0.000013063951,0.00009384442,0.00014441727,0.00014825274,0.00050712907,0.9984384,0.000006283528],"about_ca_topic_score_codex":0.4734345,"about_ca_topic_score_gemma":0.7564601,"teacher_disagreement_score":0.99152356,"about_ca_system_score_codex":0.00847645,"about_ca_system_score_gemma":0.02776367,"threshold_uncertainty_score":0.96954715},"labels":[],"label_agreement":null},{"id":"W4402842510","doi":"10.1007/978-3-031-61515-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 8","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Engineering; Political science; Civil engineering; Engineering ethics; Library science; Environmental science; Environmental ethics; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005354157838802051,"score_gpt":0.17737853719040267,"score_spread":0.17202437935160061,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402842510","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032292632,0.017577799,0.0033235026,0.028193798,0.06276765,0.00019666187,0.0056716297,0.0008140998,0.8782257],"genre_scores_gemma":[0.0033806867,0.0043729465,0.0008111242,0.0006339054,0.0008296522,0.000025435509,0.0017993422,0.00017466345,0.9879722],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998596,0.0000697087,0.000022774084,0.00007439315,0.0010344242,0.0002027139],"domain_scores_gemma":[0.9978473,0.000064313754,0.00002094911,0.000050349096,0.0015586806,0.0004584274],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014611593,0.0011848097,0.00086162984,0.0018316923,0.0026443277,0.005269256,0.001300392,0.001925225,0.30557436],"category_scores_gemma":[0.001505985,0.00043520992,0.00051572436,0.0022665262,0.0009766713,0.00138952,0.0017656881,0.001909965,0.11044149],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001803888,0.000020299805,0.00011303194,0.00004491476,0.0000024125466,0.000016875321,0.000024188832,0.000083525636,0.0002344065,0.0011785817,0.97143203,0.02683161],"study_design_scores_gemma":[0.0000036012766,0.0000053797207,0.00065845053,0.000040766292,0.0000035271285,0.000013643022,0.00009346147,0.00012992583,0.00014471966,0.00044536195,0.9984549,0.0000062030267],"about_ca_topic_score_codex":0.43982425,"about_ca_topic_score_gemma":0.7287691,"teacher_disagreement_score":0.99253356,"about_ca_system_score_codex":0.007466444,"about_ca_system_score_gemma":0.025175715,"threshold_uncertainty_score":0.9905139},"labels":[],"label_agreement":null},{"id":"W4402956418","doi":"10.18280/mmep.110903","title":"Particle Swarm Optimization and Tree Models (M5P) as Cost Estimation Tool for Construction Project","year":2024,"lang":"en","type":"article","venue":"Mathematical Modelling and Engineering Problems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Particle swarm optimization; Estimation; Tree (set theory); Computer science; Data mining; Engineering; Machine learning; Mathematics; Systems engineering","score_opus":0.023668060134078225,"score_gpt":0.223355112125082,"score_spread":0.19968705199100378,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402956418","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019985171,0.0006482542,0.9750954,0.00020003648,0.000069233014,0.00006342778,0.00009461822,0.00021429142,0.0036295478],"genre_scores_gemma":[0.5936325,0.0016863111,0.39680153,0.00009696917,0.00006401366,0.00039855373,0.00033525762,0.000104880775,0.006879909],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952745,0.00020647106,0.000023673003,0.00005520577,0.00016742508,0.000019750414],"domain_scores_gemma":[0.9992951,0.00044013324,0.00010022707,0.000038565435,0.000110917674,0.000015087989],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009975268,0.0007698576,0.00085935293,0.0010041547,0.0003460546,0.0009134515,0.00064600655,0.00091332354,0.0014549397],"category_scores_gemma":[0.0024353769,0.00048126536,0.00075015915,0.0017442793,0.00028665998,0.0010304693,0.00047601128,0.000963406,0.00032624506],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000022814414,0.000022753009,0.00085510133,0.000058389025,0.000031489777,0.000026204068,0.000026770687,0.9561534,0.00045514962,0.0066504604,0.000659556,0.035037953],"study_design_scores_gemma":[0.000001783558,0.000014230977,0.00017995294,0.000006090064,0.0000035347875,0.000005715081,0.0000040795226,0.9978871,0.0001689449,0.0012263027,0.00049874483,0.000003538575],"about_ca_topic_score_codex":0.007856242,"about_ca_topic_score_gemma":0.0077283382,"teacher_disagreement_score":0.007856242,"about_ca_system_score_codex":0.0005906538,"about_ca_system_score_gemma":0.0008346841,"threshold_uncertainty_score":0.015621066},"labels":[],"label_agreement":null},{"id":"W4402977997","doi":"10.1145/3640310.3674085","title":"Toward Intelligent Generation of Tailored Graphical Concrete Syntax","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal; École de Technologie Supérieure; Université de Montréal","funders":"","keywords":"Computer science; Syntax; Programming language; Human–computer interaction; Natural language processing","score_opus":0.027476778726008615,"score_gpt":0.2280989242891074,"score_spread":0.2006221455630988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4402977997","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003632406,0.00007305891,0.98899543,0.00029107853,0.000032539785,0.00011108327,0.00017112866,0.0046727853,0.0020204317],"genre_scores_gemma":[0.042987436,0.00018845478,0.95233405,0.00016958754,0.000014055126,0.00016165791,0.0009667131,0.0017398171,0.0014382494],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9961604,0.0015108112,0.00028025746,0.00050974026,0.0013646465,0.00017412039],"domain_scores_gemma":[0.99322504,0.0027593737,0.00036012297,0.0021457106,0.0013363931,0.0001732841],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0059297285,0.0013164763,0.0008055142,0.0018915532,0.00085836067,0.003944985,0.002466732,0.0017681178,0.0046235346],"category_scores_gemma":[0.016191922,0.0011998878,0.0017865978,0.0012252307,0.0023549506,0.005405267,0.0055853124,0.0029594656,0.0025192543],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019503044,0.00032063187,0.0027109992,0.0010114948,0.00012969787,0.00076745934,0.0060556694,0.08929782,0.035665102,0.47558275,0.023201281,0.3650621],"study_design_scores_gemma":[0.00008230624,0.000108964035,0.00042478254,0.00034803394,0.000110997404,0.0005398674,0.0009384974,0.58213955,0.037767366,0.23474863,0.14264551,0.00014551745],"about_ca_topic_score_codex":0.0018653008,"about_ca_topic_score_gemma":0.0035034637,"teacher_disagreement_score":0.0059297285,"about_ca_system_score_codex":0.0010407552,"about_ca_system_score_gemma":0.0028878958,"threshold_uncertainty_score":0.031359732},"labels":[],"label_agreement":null},{"id":"W4403039909","doi":"10.1007/978-3-031-60415-7_10","title":"Reinforcement Learning for Design","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Reinforcement; Reinforcement learning; Computer science; Psychology; Artificial intelligence; Social psychology","score_opus":0.011314443200765516,"score_gpt":0.19830078458390796,"score_spread":0.18698634138314243,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403039909","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002496416,0.00512544,0.9373604,0.00071003166,0.00028428296,0.00003599873,0.00012447315,0.0010116538,0.052851345],"genre_scores_gemma":[0.26598108,0.006010419,0.5551364,0.0005263823,0.0004461473,0.00039736903,0.00078821694,0.00062818406,0.17008585],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99966025,0.00012229019,0.000013389813,0.00007740873,0.000108432934,0.000018293957],"domain_scores_gemma":[0.99954766,0.00026922693,0.00002193772,0.00008718806,0.00005950928,0.000014561225],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055767834,0.00090738887,0.00082919287,0.00037687944,0.0002938902,0.0009784106,0.00095218315,0.00091929175,0.019584343],"category_scores_gemma":[0.0016946921,0.00035825116,0.00045242236,0.0005015456,0.0008242819,0.001097157,0.0009626132,0.0016761387,0.0038926753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000388426,0.00008526604,0.00025874318,0.00027595126,0.00004450167,0.000050870072,0.00008689106,0.19917157,0.0010978305,0.21368168,0.03107656,0.5541314],"study_design_scores_gemma":[0.000020631089,0.000044468223,0.00026297563,0.00011375671,0.000014086177,0.000049217473,0.000035887526,0.5235732,0.0008915763,0.41584256,0.05913714,0.000014469937],"about_ca_topic_score_codex":0.0023652215,"about_ca_topic_score_gemma":0.0032036388,"teacher_disagreement_score":0.019584343,"about_ca_system_score_codex":0.0010016776,"about_ca_system_score_gemma":0.00054055,"threshold_uncertainty_score":0.065516114},"labels":[],"label_agreement":null},{"id":"W4403040008","doi":"10.1007/978-3-031-60415-7","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 1","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Engineering; Political science; Environmental science; Library science; Aeronautics; Environmental ethics; Computer science; Physics; Philosophy; Thermodynamics","score_opus":0.005435987979092571,"score_gpt":0.17748494713711885,"score_spread":0.1720489591580263,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403040008","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028949014,0.019588752,0.0035180012,0.024602467,0.06939781,0.00021829542,0.0064790114,0.0008742721,0.8724265],"genre_scores_gemma":[0.003034678,0.004858505,0.0008585079,0.00068287,0.000973667,0.000028493943,0.0021025292,0.00020805631,0.98725265],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985714,0.000077116514,0.000023801302,0.000082102946,0.0010445543,0.0002010018],"domain_scores_gemma":[0.99783474,0.00007629344,0.000024813442,0.00005464252,0.0015475582,0.00046188224],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014750797,0.001229041,0.00096683344,0.0019623581,0.0024948735,0.0055398704,0.0013760882,0.0019892363,0.3380415],"category_scores_gemma":[0.0016272701,0.00044410085,0.00053423614,0.0024538182,0.0009224091,0.0014644655,0.0018308347,0.0018760123,0.12862206],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018122033,0.000018654453,0.000097731165,0.000053709788,0.0000024696678,0.000015834908,0.000020602018,0.00008226618,0.00023504753,0.0010882525,0.9722287,0.026138596],"study_design_scores_gemma":[0.0000032422188,0.0000052535493,0.0005599261,0.00004121783,0.0000032449536,0.000012995432,0.000072417475,0.0001200997,0.00013489721,0.00042912035,0.99861157,0.000005921225],"about_ca_topic_score_codex":0.36686715,"about_ca_topic_score_gemma":0.66911674,"teacher_disagreement_score":0.99280703,"about_ca_system_score_codex":0.0071929977,"about_ca_system_score_gemma":0.022651179,"threshold_uncertainty_score":0.94420344},"labels":[],"label_agreement":null},{"id":"W4403040570","doi":"10.1007/978-3-031-60415-7_19","title":"BIM-Based Generative Design Processes for Targeted Value Design of Low-Carbon Buildings","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Generative Design; Generative grammar; Value (mathematics); Engineering; Architectural engineering; Computer science; Artificial intelligence; Chemical engineering; Machine learning","score_opus":0.012207681702561686,"score_gpt":0.1999629566577582,"score_spread":0.18775527495519653,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403040570","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013466607,0.00018984104,0.9589387,0.0001457715,0.000032590728,0.000079936166,0.00008006632,0.0005961051,0.026470387],"genre_scores_gemma":[0.35857362,0.00046659948,0.62666667,0.000062686195,0.000014261001,0.00021027325,0.0004249401,0.0005809467,0.012999946],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99918455,0.00027735936,0.000027063517,0.000074788215,0.00037274693,0.000063599546],"domain_scores_gemma":[0.99924743,0.00040735144,0.00002732556,0.00017287835,0.00011630392,0.00002883667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013486493,0.000734784,0.0003903111,0.0007577437,0.0007282725,0.003267072,0.0013380112,0.0010439547,0.0070569795],"category_scores_gemma":[0.0023268946,0.0006721814,0.0008700731,0.00088234985,0.0010913804,0.0016615045,0.0024809747,0.0012946799,0.0012540963],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053142023,0.00015083041,0.0007653287,0.00024646785,0.000038339163,0.00023227259,0.0020150759,0.45371723,0.01164691,0.36334935,0.0028761243,0.16490905],"study_design_scores_gemma":[0.000018318764,0.00004680377,0.0004055252,0.00010769021,0.000028558232,0.00015159868,0.00048245228,0.7450938,0.012701908,0.1951403,0.045793064,0.000030008769],"about_ca_topic_score_codex":0.0015325674,"about_ca_topic_score_gemma":0.003318306,"teacher_disagreement_score":0.0070569795,"about_ca_system_score_codex":0.0010780005,"about_ca_system_score_gemma":0.0010149489,"threshold_uncertainty_score":0.02360797},"labels":[],"label_agreement":null},{"id":"W4403042201","doi":"10.3390/buildings14103139","title":"Dynamic Spatiotemporal Scheduling for Construction Building Projects","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Scheduling (production processes); Computer science; Systems engineering; Engineering; Construction engineering; Architectural engineering; Operations management","score_opus":0.009689904598732053,"score_gpt":0.24149580656566075,"score_spread":0.23180590196692868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403042201","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026793696,0.00018244146,0.9565894,0.00016725349,0.00004276394,0.00011352359,0.000540962,0.00077515916,0.014794772],"genre_scores_gemma":[0.4866788,0.00054154196,0.50494194,0.000032480002,0.000021888985,0.00030312105,0.0011763084,0.0002505659,0.0060533043],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99949133,0.00019264483,0.000037712467,0.00010706318,0.00013457809,0.000036595397],"domain_scores_gemma":[0.99940825,0.0002466854,0.000102336104,0.000106291096,0.000089252244,0.00004720212],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00082938524,0.00041406462,0.00022109257,0.00072524586,0.00051326083,0.0015612163,0.0007598128,0.00035095296,0.00507479],"category_scores_gemma":[0.002571817,0.00028706447,0.0006780632,0.0010567518,0.000502769,0.0009861623,0.000947114,0.0004067361,0.0006285812],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007647814,0.000046844456,0.0032266176,0.00013290702,0.000020263493,0.00020572718,0.0006365383,0.73510045,0.0031410134,0.18979716,0.0028532606,0.06476278],"study_design_scores_gemma":[0.000014933396,0.00004228594,0.001093418,0.000034932127,0.000015071678,0.00009269188,0.0003313911,0.9156414,0.0015567681,0.045161627,0.03599143,0.000023961698],"about_ca_topic_score_codex":0.012543355,"about_ca_topic_score_gemma":0.016019035,"teacher_disagreement_score":0.012543355,"about_ca_system_score_codex":0.0015459579,"about_ca_system_score_gemma":0.0016422755,"threshold_uncertainty_score":0.02494067},"labels":[],"label_agreement":null},{"id":"W4403241049","doi":"10.1007/978-3-031-61519-1","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 9","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Engineering ethics; Library science; Environmental ethics; Engineering; Law; Computer science; Philosophy; Physics; Thermodynamics","score_opus":0.005358715726297616,"score_gpt":0.1774163197620674,"score_spread":0.17205760403576978,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403241049","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032128938,0.016555438,0.0032065911,0.02734555,0.064475104,0.00019887091,0.005341529,0.0008211429,0.8788429],"genre_scores_gemma":[0.003478335,0.0043740366,0.00081771484,0.00065412227,0.0008926299,0.000025547253,0.0017485981,0.0001775927,0.9878314],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99853575,0.00007265048,0.000023848666,0.00007707304,0.0010770658,0.00021363123],"domain_scores_gemma":[0.9977768,0.00006513569,0.000021301912,0.000051515413,0.0015920138,0.000493133],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014673413,0.0011659669,0.0008612301,0.0018747787,0.0027688912,0.00550277,0.0013466798,0.0019308507,0.30802345],"category_scores_gemma":[0.0015172751,0.0004361144,0.0005400327,0.0022808807,0.0010243558,0.0013662298,0.0018255302,0.001886076,0.113113165],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001790217,0.00002028953,0.00011347467,0.0000442745,0.0000025119457,0.000018190141,0.000023619665,0.00008077667,0.00024113091,0.0011948167,0.972409,0.025833983],"study_design_scores_gemma":[0.0000036162585,0.000005428771,0.00065062527,0.000039552087,0.0000034402124,0.000014069242,0.000091873,0.0001271891,0.0001455657,0.00042778158,0.99848455,0.000006337943],"about_ca_topic_score_codex":0.4492317,"about_ca_topic_score_gemma":0.7325376,"teacher_disagreement_score":0.99214923,"about_ca_system_score_codex":0.007850765,"about_ca_system_score_gemma":0.026186652,"threshold_uncertainty_score":0.98702055},"labels":[],"label_agreement":null},{"id":"W4403409717","doi":"10.1016/j.jclepro.2024.143892","title":"Building material reuse: An optimization framework for sourcing new and reclaimed building materials","year":2024,"lang":"en","type":"article","venue":"Journal of Cleaner Production","topic":"BIM and Construction Integration","field":"Engineering","cited_by":15,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Reuse; Building material; Construction engineering; Architectural engineering; Waste management; Business; Engineering; Civil engineering","score_opus":0.013435986115996598,"score_gpt":0.2628508933940405,"score_spread":0.24941490727804388,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403409717","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055345725,0.00020131034,0.98685235,0.00016740525,0.00001297338,0.00014162195,0.00008450441,0.00019835496,0.006806955],"genre_scores_gemma":[0.35630345,0.0006862996,0.6358683,0.00007138466,0.000031288844,0.0008335059,0.00032994305,0.00032325005,0.005552566],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9977729,0.00095211907,0.0000990737,0.00031500155,0.0006072821,0.00025362265],"domain_scores_gemma":[0.99883455,0.0006115122,0.00016431003,0.00008571508,0.00024332223,0.000060520633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005480582,0.002070345,0.0012297824,0.0023750532,0.000707378,0.0032232993,0.0022113496,0.0016628617,0.0035478466],"category_scores_gemma":[0.004621757,0.0010486755,0.0018475438,0.0020906914,0.0015772884,0.002185751,0.0025057863,0.0014101088,0.00051609613],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016097838,0.00003347928,0.00020193901,0.000050625385,0.000016047255,0.0000310574,0.000037383044,0.9599878,0.0005161456,0.030107807,0.00029637796,0.008705207],"study_design_scores_gemma":[0.0000048029106,0.000026836096,0.00006608177,0.0000121917765,0.000009010527,0.000008511012,0.000019123627,0.99066913,0.0003094555,0.007738432,0.001128059,0.000008385305],"about_ca_topic_score_codex":0.013615647,"about_ca_topic_score_gemma":0.008614839,"teacher_disagreement_score":0.013615647,"about_ca_system_score_codex":0.0032326642,"about_ca_system_score_gemma":0.004054765,"threshold_uncertainty_score":0.028984487},"labels":[],"label_agreement":null},{"id":"W4403439585","doi":"10.1007/978-3-031-62170-3_17","title":"Monte Carlo-Enabled Dynamic Multiple-Criteria Decision Analysis for Selecting Sustainable Construction Methods: A Wind Farm Case Study","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada)","funders":"","keywords":"Monte Carlo method; Computer science; Operations research; Mathematical optimization; Engineering; Mathematics; Statistics","score_opus":0.009546911689743368,"score_gpt":0.2668822892831484,"score_spread":0.257335377593405,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34799632,0.0006157224,0.6253967,0.0004703106,0.000047119793,0.00029887733,0.00025144857,0.0004203708,0.024502985],"genre_scores_gemma":[0.836786,0.00017248983,0.15886664,0.00002774896,0.000007785398,0.0001565688,0.0000994745,0.000052759166,0.0038304988],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990989,0.0004849731,0.00002957259,0.00006632938,0.00023483377,0.000085413114],"domain_scores_gemma":[0.99639493,0.0031413217,0.000080458514,0.000079897574,0.00024334747,0.000060076967],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023128758,0.00067153375,0.0008214391,0.0010134894,0.00088423304,0.0014267613,0.0008001011,0.0014120828,0.002917583],"category_scores_gemma":[0.0030893246,0.0005513642,0.0007242119,0.0012745793,0.00068410486,0.0009277725,0.0006713431,0.0008592215,0.00020709413],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000102807135,0.00014636526,0.00077215256,0.000039325623,0.000020322419,0.00020978136,0.00006494238,0.9647933,0.001155675,0.007989451,0.00044476113,0.024261096],"study_design_scores_gemma":[0.000010475283,0.000030942134,0.00016895049,0.000005856961,0.000005305067,0.000024815727,0.000022097447,0.9969934,0.00033008907,0.0020728267,0.00032731172,0.000007842916],"about_ca_topic_score_codex":0.011075461,"about_ca_topic_score_gemma":0.021538148,"teacher_disagreement_score":0.011075461,"about_ca_system_score_codex":0.0014364026,"about_ca_system_score_gemma":0.0013792817,"threshold_uncertainty_score":0.022022009},"labels":[],"label_agreement":null},{"id":"W4403439587","doi":"10.1007/978-3-031-62170-3_18","title":"The Use of BIM in Railway Projects","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Architectural engineering; Construction engineering; Transport engineering; Engineering","score_opus":0.016371024933627704,"score_gpt":0.19575082548165879,"score_spread":0.17937980054803107,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439587","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0055634,0.038942132,0.112629294,0.0015911569,0.0006916269,0.00004172126,0.00018980856,0.0004738069,0.83987707],"genre_scores_gemma":[0.1480863,0.09682649,0.18944839,0.0010177128,0.00067796645,0.00015382493,0.0010505844,0.0008508171,0.56188786],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99918777,0.00027046952,0.000025662923,0.000054358574,0.00042009674,0.00004172931],"domain_scores_gemma":[0.999572,0.00027072112,0.000013661634,0.000059866845,0.00006963949,0.000014116556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011801651,0.0005977417,0.00035619488,0.0017581442,0.0006419044,0.0039127693,0.00084595685,0.00094366464,0.01415443],"category_scores_gemma":[0.0013374736,0.00060886116,0.00043828346,0.0038982283,0.0010402258,0.0034199532,0.0020437613,0.0011684563,0.0042904806],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012675059,0.00004437789,0.00030537107,0.0003817976,0.000014281101,0.0002108764,0.0009418056,0.0049419804,0.0013394224,0.43975183,0.035177045,0.5168785],"study_design_scores_gemma":[0.0000031156405,0.00001962224,0.001044259,0.000648035,0.000013448321,0.000553228,0.00052498677,0.00669047,0.0011390988,0.09512613,0.8942216,0.00001600037],"about_ca_topic_score_codex":0.0016838282,"about_ca_topic_score_gemma":0.0035010888,"teacher_disagreement_score":0.01415443,"about_ca_system_score_codex":0.0008624599,"about_ca_system_score_gemma":0.00070895354,"threshold_uncertainty_score":0.0473513},"labels":[],"label_agreement":null},{"id":"W4403439604","doi":"10.1007/978-3-031-62170-3_31","title":"Applications of Travelling Salesman Optimization in Construction Scheduling","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Travelling salesman problem; Mathematical optimization; Computer science; Scheduling (production processes); Operations research; Mathematics","score_opus":0.005453663815352953,"score_gpt":0.18756405898391526,"score_spread":0.1821103951685623,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439604","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007078636,0.008515354,0.920938,0.000617431,0.0007453584,0.00007530452,0.0001448601,0.0004243323,0.061460823],"genre_scores_gemma":[0.25354415,0.016647397,0.6645988,0.00035035054,0.001124462,0.0002596475,0.0004940725,0.001146395,0.061834753],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993018,0.0003122965,0.00003005826,0.000102946455,0.00019180507,0.000061142266],"domain_scores_gemma":[0.9991374,0.00065159844,0.0000394674,0.000050321192,0.00008034014,0.000040886032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010801475,0.0018391651,0.0021258085,0.001260978,0.000759372,0.0017538513,0.0019391997,0.001663237,0.011220877],"category_scores_gemma":[0.0029374673,0.0011741711,0.0016324819,0.004645174,0.00095607026,0.0014573509,0.0012567515,0.0023620327,0.002204645],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000047421105,0.00009406372,0.00012865767,0.0002125078,0.00006006635,0.00006284313,0.00006507829,0.78727174,0.0008149558,0.086273536,0.007878387,0.11709073],"study_design_scores_gemma":[0.000009585225,0.000023426974,0.00007520354,0.000024924546,0.000012917926,0.000022674845,0.000021635498,0.9167634,0.00029200685,0.0734171,0.0093262,0.000010973553],"about_ca_topic_score_codex":0.0098897675,"about_ca_topic_score_gemma":0.008762443,"teacher_disagreement_score":0.011220877,"about_ca_system_score_codex":0.0019472176,"about_ca_system_score_gemma":0.0015362309,"threshold_uncertainty_score":0.037537575},"labels":[],"label_agreement":null},{"id":"W4403439699","doi":"10.1007/978-3-031-62170-3_20","title":"An Analysis of Extended Reality Research in the Construction Industry","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Ontario College of Art and Design; George Brown College","funders":"","keywords":"Business","score_opus":0.028645686129654836,"score_gpt":0.28810400139785464,"score_spread":0.2594583152681998,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439699","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.117682025,0.01305914,0.4582373,0.0047864644,0.00026226326,0.000115131515,0.0003330291,0.00022656638,0.40529814],"genre_scores_gemma":[0.8141908,0.0061712884,0.08081304,0.00041841576,0.00030408127,0.00013271025,0.0003552588,0.00019126995,0.09742303],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9982412,0.0008855441,0.000065591856,0.0002318962,0.00041278076,0.00016293886],"domain_scores_gemma":[0.99446976,0.004052378,0.00024044748,0.00037247365,0.00071008294,0.00015482347],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.0023524193,0.00053389405,0.00064696214,0.00249359,0.0010782604,0.00380023,0.0012148138,0.0010270972,0.023969386],"category_scores_gemma":[0.007042006,0.00042123243,0.0014411864,0.0033031271,0.0028504163,0.0073174527,0.001825956,0.001516384,0.0015524036],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025566302,0.0000303625,0.00031500202,0.000057264187,0.00001136564,0.00009828748,0.00038779958,0.0055331364,0.00031790344,0.97396684,0.0012870253,0.017969342],"study_design_scores_gemma":[0.000009669483,0.00007798618,0.0014302642,0.00008863427,0.000033273085,0.00018577183,0.001078645,0.04807648,0.00059934694,0.9245047,0.023895442,0.000019716039],"about_ca_topic_score_codex":0.0031690926,"about_ca_topic_score_gemma":0.0025797065,"teacher_disagreement_score":0.99750644,"about_ca_system_score_codex":0.0024386935,"about_ca_system_score_gemma":0.001271651,"threshold_uncertainty_score":0.08018559},"labels":[],"label_agreement":null},{"id":"W4403439763","doi":"10.1007/978-3-031-62170-3_25","title":"Development of a Machine-Learning Enhanced Modular Residential Construction Direct Cost Estimation Method","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Estimation; Computer science; Direct cost; Cost estimate; Artificial intelligence; Machine learning; Engineering; Indirect costs; Systems engineering; Economics; Programming language; Management","score_opus":0.006696607255699696,"score_gpt":0.21744406615007258,"score_spread":0.21074745889437288,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439763","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002790749,0.00008323079,0.99529064,0.00002407411,0.000040568015,0.000028265913,0.000064112464,0.0007215631,0.0009569196],"genre_scores_gemma":[0.088408396,0.0001712435,0.9019943,0.00008041253,0.0000709542,0.0001666617,0.00065486616,0.00017824177,0.008274989],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996685,0.000051356048,0.00001684937,0.00009318235,0.00014393755,0.000026211097],"domain_scores_gemma":[0.99956876,0.00011037362,0.000025753237,0.00004637029,0.00023607869,0.000012723816],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00058617373,0.0005918866,0.0007948678,0.00068314024,0.00024850524,0.000523939,0.001323168,0.00074330857,0.005449864],"category_scores_gemma":[0.0011624818,0.00043478506,0.0006749916,0.00070524396,0.00018187551,0.0007078666,0.0007462448,0.00075807597,0.0029873815],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000656587,0.00009363389,0.00076763565,0.000109829045,0.000076018405,0.00006336535,0.000031432384,0.21636942,0.019539734,0.004819354,0.00439663,0.7536673],"study_design_scores_gemma":[0.000005064062,0.000016039116,0.00029669667,0.0000048658176,0.000008220708,0.000029677574,0.0000044522667,0.9935063,0.0029249962,0.0006832694,0.0025138785,0.000006458739],"about_ca_topic_score_codex":0.0051520267,"about_ca_topic_score_gemma":0.0063570854,"teacher_disagreement_score":0.005449864,"about_ca_system_score_codex":0.00032142797,"about_ca_system_score_gemma":0.00090893556,"threshold_uncertainty_score":0.01823163},"labels":[],"label_agreement":null},{"id":"W4403439965","doi":"10.1007/978-3-031-62170-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 3","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Environmental ethics; Regional science; Environmental planning; Library science; Geography; Computer science; Law; Philosophy; Thermodynamics; Physics","score_opus":0.005347599011916901,"score_gpt":0.17724203849994952,"score_spread":0.17189443948803262,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439965","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032954754,0.018210651,0.0035956127,0.02707607,0.06541002,0.00020233373,0.005622073,0.0008346399,0.8757532],"genre_scores_gemma":[0.0034502952,0.0045482526,0.000837317,0.0006481336,0.0008761418,0.000025251866,0.0017463963,0.00018820373,0.9876801],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99857724,0.000069340604,0.000022458717,0.00007640236,0.0010540972,0.00020038323],"domain_scores_gemma":[0.9978204,0.00006914059,0.000021721635,0.00005280565,0.0015803829,0.0004555578],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014426243,0.0011916294,0.00089157774,0.0018590275,0.0026255508,0.0055921176,0.001317671,0.0019237844,0.30304274],"category_scores_gemma":[0.0015384465,0.00043606246,0.0005434422,0.0023673961,0.0009957815,0.001383997,0.001821966,0.0019109944,0.111133136],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018475881,0.0000203175,0.00011247693,0.00004664679,0.0000025969248,0.000017695487,0.000024751416,0.00009241386,0.0002469023,0.0012325475,0.97087693,0.027308222],"study_design_scores_gemma":[0.0000034485772,0.000005169073,0.00060497154,0.00003973964,0.0000035543396,0.000014130943,0.000089178044,0.00013513595,0.00015102042,0.0004623554,0.998485,0.0000062035215],"about_ca_topic_score_codex":0.43385756,"about_ca_topic_score_gemma":0.7165012,"teacher_disagreement_score":0.43385756,"about_ca_system_score_codex":0.007583343,"about_ca_system_score_gemma":0.02494251,"threshold_uncertainty_score":0.99412495},"labels":[],"label_agreement":null},{"id":"W4403439988","doi":"10.1007/978-3-031-62170-3_1","title":"Automated Identification and Impact Quantification of Financial Budget Items from Construction Data","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Identification (biology); Business; Finance; Computer science","score_opus":0.0118239432839572,"score_gpt":0.22974093036711188,"score_spread":0.21791698708315468,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403439988","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.34356585,0.0023966436,0.6108305,0.00049056445,0.00011609335,0.00029982688,0.020800674,0.010134827,0.0113650365],"genre_scores_gemma":[0.58845353,0.0011960865,0.36605003,0.000060390084,0.00009100153,0.00026150118,0.039264355,0.00033106824,0.004292058],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99902475,0.00017028714,0.000072919065,0.00014201303,0.00048145867,0.0001086176],"domain_scores_gemma":[0.9983323,0.0007998182,0.0002165465,0.00025202546,0.00036088313,0.000038394617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010237523,0.0008285958,0.000731233,0.005537714,0.00025795132,0.0017448821,0.0007641547,0.000630958,0.0016667243],"category_scores_gemma":[0.0035925338,0.00042789525,0.0007947243,0.004734133,0.0002510661,0.001475513,0.0012495779,0.00066727947,0.001706846],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017751535,0.00021146475,0.027629117,0.00035040177,0.00015689344,0.0001721311,0.00017686817,0.055903178,0.018788954,0.003952828,0.009343565,0.88313705],"study_design_scores_gemma":[0.000020552185,0.00009133454,0.06028893,0.0001311265,0.00009661011,0.0003017864,0.0004380341,0.88756967,0.02400279,0.010020525,0.016983017,0.000055653392],"about_ca_topic_score_codex":0.00509643,"about_ca_topic_score_gemma":0.010110287,"teacher_disagreement_score":0.005537714,"about_ca_system_score_codex":0.00051696657,"about_ca_system_score_gemma":0.00079529634,"threshold_uncertainty_score":0.0101335645},"labels":[],"label_agreement":null},{"id":"W4403440116","doi":"10.1007/978-3-031-62170-3_28","title":"Optimal Space Layout Generation for Modular Offsite Construction for Whole Life Cycle Costs—Gaps and Requirements","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Modular design; Modular construction; Space (punctuation); Computer science; Architectural engineering; Engineering; Programming language","score_opus":0.01067583669584899,"score_gpt":0.21078312832741217,"score_spread":0.20010729163156318,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403440116","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07757099,0.00039124768,0.90093976,0.000100457815,0.000051231476,0.00009694445,0.00021047475,0.00048167218,0.020157125],"genre_scores_gemma":[0.79206,0.00022328176,0.19958916,0.000029835337,0.000019637002,0.000114099916,0.00025895433,0.00025402685,0.0074509354],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99978215,0.000064657856,0.0000054944912,0.000036545174,0.00006786355,0.000043399996],"domain_scores_gemma":[0.9998004,0.00009953516,0.000019676458,0.00002250811,0.000045215544,0.000012727724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003500279,0.00080996804,0.0008842978,0.00069568184,0.00029762514,0.0009426254,0.0008279127,0.0007469936,0.009298107],"category_scores_gemma":[0.00083148695,0.00048078113,0.0007547321,0.0008110227,0.0003093958,0.0009538953,0.0006420133,0.0005135887,0.0008811384],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018531691,0.00008562232,0.0003953761,0.00012862126,0.000017741635,0.00006929133,0.0000632084,0.841609,0.010057568,0.00995546,0.0023926403,0.13504021],"study_design_scores_gemma":[0.000012883809,0.000101460566,0.00039333894,0.000014775165,0.000015587539,0.000038239054,0.000044228185,0.98873585,0.0024697634,0.006907143,0.0012589848,0.000007763232],"about_ca_topic_score_codex":0.001948318,"about_ca_topic_score_gemma":0.0038081664,"teacher_disagreement_score":0.009298107,"about_ca_system_score_codex":0.0007234011,"about_ca_system_score_gemma":0.00081240956,"threshold_uncertainty_score":0.03110528},"labels":[],"label_agreement":null},{"id":"W4403516385","doi":"","title":"L'interopérabilité BIM multi métiers : la collaboration par la requête","year":2020,"lang":"fr","type":"book-chapter","venue":"PolyPublie (École Polytechnique de Montréal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Polytechnique Montréal","funders":"","keywords":"Business","score_opus":0.010266359358560387,"score_gpt":0.21464959655231586,"score_spread":0.20438323719375548,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403516385","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012023244,0.012977663,0.4544916,0.0062761446,0.0011629531,0.00009489759,0.00030979904,0.0018764912,0.5107872],"genre_scores_gemma":[0.15232992,0.010810426,0.16442068,0.0008063281,0.00056057225,0.00021037766,0.00088560063,0.0016874289,0.6682886],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980147,0.00040248033,0.000050884417,0.00025706983,0.001114573,0.00016027129],"domain_scores_gemma":[0.9992811,0.00024197281,0.00002279147,0.00013766253,0.00026301222,0.00005345221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027158973,0.0011015203,0.00059524,0.0016950897,0.0018742862,0.008046498,0.0014033534,0.0020569505,0.019118791],"category_scores_gemma":[0.0023771352,0.0009226126,0.0007742189,0.0026061062,0.0021620276,0.005528127,0.0032797218,0.0021997008,0.004187196],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003519001,0.000052974585,0.00049016264,0.00017645872,0.000021856351,0.00040202076,0.0037452325,0.0046718,0.0064531425,0.5546853,0.058617257,0.37064865],"study_design_scores_gemma":[0.000008276504,0.00002392521,0.0011719111,0.00022072226,0.000017180106,0.00043039038,0.000743219,0.009604316,0.0036985993,0.029139841,0.9549108,0.00003074197],"about_ca_topic_score_codex":0.07725896,"about_ca_topic_score_gemma":0.0815005,"teacher_disagreement_score":0.07725896,"about_ca_system_score_codex":0.0049341675,"about_ca_system_score_gemma":0.0037570286,"threshold_uncertainty_score":0.15361851},"labels":[],"label_agreement":null},{"id":"W4403531947","doi":"10.5194/isprs-annals-x-4-2024-141-2024","title":"Semantic Segmentation Uncertainty Assessment of Different U-net Architectures for Extracting Building Footprints","year":2024,"lang":"en","type":"article","venue":"ISPRS annals of the photogrammetry, remote sensing and spatial information sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Segmentation; Computer science; Artificial intelligence; Natural language processing","score_opus":0.03155067032171511,"score_gpt":0.32457193545459223,"score_spread":0.29302126513287713,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403531947","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.67890394,0.0026643532,0.29974583,0.00092984334,0.00027971325,0.00022726043,0.0016124671,0.004753137,0.010883491],"genre_scores_gemma":[0.942266,0.0003627913,0.05248058,0.00021988797,0.000032470864,0.00010002722,0.0022798365,0.00012731481,0.0021310272],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99961025,0.00008571255,0.000028191102,0.00011402587,0.00007353938,0.000088323366],"domain_scores_gemma":[0.9992003,0.000391412,0.00006956879,0.00007484034,0.00021042203,0.000053474654],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001619854,0.0017244477,0.0008638634,0.0018303632,0.00057795644,0.0015571113,0.001569954,0.0015943972,0.001917333],"category_scores_gemma":[0.0026437931,0.00043956123,0.0011915029,0.0010435674,0.0006521058,0.0019112853,0.0010978851,0.001046141,0.0006435405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00058204815,0.00018547574,0.0073462063,0.0001317496,0.00012849798,0.000112260306,0.00008474798,0.865821,0.0020985322,0.0018842487,0.0019903427,0.11963493],"study_design_scores_gemma":[0.000004148002,0.00003927986,0.000625375,0.00001741694,0.000015716596,0.000016656566,0.000026888452,0.9971085,0.001180417,0.0007385093,0.00022103699,0.0000059461036],"about_ca_topic_score_codex":0.021523932,"about_ca_topic_score_gemma":0.021926098,"teacher_disagreement_score":0.021523932,"about_ca_system_score_codex":0.0020083934,"about_ca_system_score_gemma":0.001216183,"threshold_uncertainty_score":0.042797267},"labels":[],"label_agreement":null},{"id":"W4403658556","doi":"10.1007/978-981-97-8237-6_25","title":"Inclusive Approach in Advancing Sustainability in Road Construction","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"EXP (Canada); Ministry of Transportation of Ontario","funders":"","keywords":"Sustainability; Road construction; Construction engineering; Environmental planning; Transport engineering; Engineering; Architectural engineering; Environmental science; Ecology","score_opus":0.003199439227290568,"score_gpt":0.19566182640351973,"score_spread":0.19246238717622915,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403658556","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010357769,0.014730508,0.071952626,0.006785678,0.00084503746,0.000047780806,0.000030520452,0.000109498054,0.8951405],"genre_scores_gemma":[0.5709762,0.02423964,0.053388063,0.0024640467,0.00055116025,0.00023878433,0.000116165844,0.00030719256,0.3477188],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9981164,0.0007580963,0.00005405481,0.00012216422,0.0007607649,0.00018854481],"domain_scores_gemma":[0.9993255,0.00031776426,0.000036082674,0.00010680243,0.0001368115,0.00007704489],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022590507,0.0005869729,0.0005174157,0.0012269275,0.002829334,0.007033113,0.0014829703,0.0018729514,0.011512044],"category_scores_gemma":[0.0023562931,0.00033164964,0.0004203057,0.0022532244,0.0060322927,0.005886245,0.0076691327,0.0031078807,0.0015706568],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000050611525,0.00003456817,0.00014106133,0.00011858125,0.000007793546,0.000059720238,0.0024145078,0.0010055796,0.0001810481,0.94099486,0.005938451,0.04909883],"study_design_scores_gemma":[0.0000023776377,0.000018244704,0.0003862524,0.00027220554,0.000011264264,0.00011909608,0.0035207993,0.0009337485,0.0003965726,0.6547485,0.33958074,0.000010159289],"about_ca_topic_score_codex":0.0021477807,"about_ca_topic_score_gemma":0.0071947044,"teacher_disagreement_score":0.011512044,"about_ca_system_score_codex":0.002943332,"about_ca_system_score_gemma":0.0036336624,"threshold_uncertainty_score":0.038511634},"labels":[],"label_agreement":null},{"id":"W4403740748","doi":"10.1016/j.jobe.2024.111008","title":"Structural and embodied carbon performance optimization for low carbon buildings through BIM-based integrated design","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Embodied cognition; Carbon fibers; Architectural engineering; Building information modeling; Engineering; Computer science; Materials science; Composite material; Composite number; Compatibility (geochemistry)","score_opus":0.010179712833511273,"score_gpt":0.208708792839235,"score_spread":0.19852908000572372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403740748","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.37853009,0.0004503462,0.5863674,0.00020633457,0.00006915008,0.00007535606,0.0003114983,0.00044155467,0.03354827],"genre_scores_gemma":[0.9605245,0.00009034235,0.037480902,0.000023418846,0.0000055141936,0.000042219097,0.00014171524,0.000058741665,0.0016327394],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971706,0.00006788974,0.000008842782,0.000033517757,0.00012152435,0.000051187402],"domain_scores_gemma":[0.99977094,0.000091608075,0.000021733651,0.000025830966,0.00007283697,0.000017089793],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00055358326,0.0006835711,0.00089376024,0.00074737886,0.0003810835,0.0012408285,0.00070478703,0.0008857918,0.0026445198],"category_scores_gemma":[0.0008490498,0.00045114246,0.0006773121,0.00083383155,0.00036502373,0.0008172581,0.000773487,0.00052427663,0.00039079975],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024093548,0.000045533627,0.00037354615,0.000014701708,0.00001042561,0.000012658456,0.000008273127,0.99111664,0.0012796159,0.0010899937,0.000076819866,0.005947728],"study_design_scores_gemma":[0.0000030557799,0.000016799244,0.00020637046,0.0000024591636,0.0000052732776,0.0000038962294,0.000007442352,0.99858606,0.0005125308,0.0004884965,0.00016483408,0.0000029371374],"about_ca_topic_score_codex":0.004802789,"about_ca_topic_score_gemma":0.0067722523,"teacher_disagreement_score":0.004802789,"about_ca_system_score_codex":0.0007388565,"about_ca_system_score_gemma":0.0010218102,"threshold_uncertainty_score":0.009549677},"labels":[],"label_agreement":null},{"id":"W4403764198","doi":"10.24908/pceea.2023.17095","title":"Employing AI to Help Evaluate Accumulating Student Perspective in Curricular Design","year":2024,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Perspective (graphical); Mathematics education; Psychology; Engineering ethics; Cognitive science; Computer science; Engineering; Artificial intelligence","score_opus":0.010942900314812024,"score_gpt":0.26757223314826145,"score_spread":0.2566293328334494,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403764198","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9421789,0.00005848671,0.039701574,0.00021842643,0.00003468694,0.0005671751,0.00014999864,0.00034861962,0.016742107],"genre_scores_gemma":[0.94779956,0.00006825539,0.048155744,0.00006727098,0.000010656227,0.00057241716,0.00019893525,0.000043521064,0.0030836242],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.98671967,0.007177168,0.0013560506,0.0008117795,0.0033885152,0.0005469907],"domain_scores_gemma":[0.9203936,0.04457943,0.0075575644,0.0050792876,0.020324623,0.002065476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.020227244,0.00054729095,0.00044484975,0.004657194,0.00077940174,0.0037896372,0.0006303104,0.0004929782,0.0025752233],"category_scores_gemma":[0.06698197,0.00020375989,0.00039319944,0.0026497836,0.00077327696,0.0023080048,0.0022841883,0.0011519546,0.0006764373],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000603968,0.0027126304,0.5611885,0.0004752771,0.0001002937,0.00016968724,0.05626804,0.0026396227,0.019614693,0.007164193,0.0019835052,0.3470796],"study_design_scores_gemma":[0.00015431445,0.008734242,0.7502749,0.00036777704,0.00019961681,0.00045425535,0.1071764,0.05047058,0.04211269,0.010307114,0.02945513,0.00029300048],"about_ca_topic_score_codex":0.0012343063,"about_ca_topic_score_gemma":0.003422,"teacher_disagreement_score":0.020227244,"about_ca_system_score_codex":0.0013659865,"about_ca_system_score_gemma":0.0015192667,"threshold_uncertainty_score":0.10697311},"labels":[],"label_agreement":null},{"id":"W4403842269","doi":"10.1016/j.plas.2024.100160","title":"How does building information modeling influence decision-making process in the project design? An input, process and output analysis","year":2024,"lang":"en","type":"article","venue":"Project Leadership and Society","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; HEC Montréal","funders":"","keywords":"Decision analysis; Computer science; Decision-making; Process (computing); Design process; Management science; Engineering; Mathematics; Operations management; Work in process; Statistics","score_opus":0.03807971579096417,"score_gpt":0.2948443897710444,"score_spread":0.2567646739800802,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4403842269","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.43476406,0.0015029055,0.38642153,0.012688858,0.0001981669,0.0010073795,0.00050554785,0.00039528124,0.1625163],"genre_scores_gemma":[0.9567419,0.000551191,0.040150158,0.00025285035,0.00002490016,0.0002201569,0.00012937828,0.00013467796,0.0017947105],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9508717,0.033802655,0.001479179,0.0023042231,0.009015757,0.0025265343],"domain_scores_gemma":[0.8881439,0.089933075,0.0070112306,0.0057249954,0.0078072995,0.00137946],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.037852097,0.0013078955,0.0010021643,0.004074704,0.0023902273,0.017573442,0.0015071292,0.0023284347,0.005733847],"category_scores_gemma":[0.07048422,0.0011424109,0.0017556421,0.004392958,0.0054539284,0.013542286,0.005718227,0.003224062,0.00094261195],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0008714472,0.0010723498,0.12818463,0.002658622,0.00082258455,0.0018076724,0.059303686,0.09485072,0.00946335,0.43762434,0.004547941,0.2587928],"study_design_scores_gemma":[0.00018515617,0.0007666426,0.0811589,0.0029438739,0.0011155999,0.0007665228,0.06633927,0.30306667,0.022216521,0.42241988,0.0983645,0.0006564506],"about_ca_topic_score_codex":0.004250841,"about_ca_topic_score_gemma":0.0040754913,"teacher_disagreement_score":0.037852097,"about_ca_system_score_codex":0.006973163,"about_ca_system_score_gemma":0.008439072,"threshold_uncertainty_score":0.20018339},"labels":[],"label_agreement":null},{"id":"W4404014467","doi":"10.2118/222174-ms","title":"How to do Fast-Track Projects","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hatch (Canada)","funders":"","keywords":"Track (disk drive); Computer science; Operating system","score_opus":0.009240955506251447,"score_gpt":0.21077488447675097,"score_spread":0.20153392897049952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404014467","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11046694,0.01821393,0.4416765,0.11198619,0.009275633,0.006730953,0.00087423035,0.006623769,0.29415187],"genre_scores_gemma":[0.3308052,0.015664859,0.51471347,0.008210715,0.0011033195,0.0035196103,0.0012188145,0.0020159332,0.122748084],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9687743,0.015361006,0.0019167365,0.0022738874,0.009684499,0.001989528],"domain_scores_gemma":[0.9278245,0.018966258,0.0068092193,0.008648925,0.029651811,0.008099252],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03240869,0.001014862,0.0007023883,0.004619187,0.007132864,0.014316338,0.0033020896,0.0031905228,0.02589311],"category_scores_gemma":[0.07878203,0.0013092558,0.0009754225,0.003844302,0.0033166804,0.01591414,0.00655739,0.0038391175,0.017998502],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000102851154,0.00042196366,0.0066795303,0.0022894097,0.00007210189,0.0010894918,0.03232883,0.0017829017,0.0035275319,0.03555765,0.18571544,0.7304322],"study_design_scores_gemma":[0.00006645654,0.00041004174,0.0058628735,0.0033790884,0.00004707255,0.0008196734,0.04920684,0.0010733636,0.0033983167,0.030008264,0.9055666,0.0001613897],"about_ca_topic_score_codex":0.004680225,"about_ca_topic_score_gemma":0.008188561,"teacher_disagreement_score":0.03240869,"about_ca_system_score_codex":0.0043654004,"about_ca_system_score_gemma":0.019406976,"threshold_uncertainty_score":0.17139554},"labels":[],"label_agreement":null},{"id":"W4404198497","doi":"10.1016/j.engstruct.2024.119269","title":"Enhancing seismic resilience in modular steel building through three-dimensional isolation","year":2024,"lang":"en","type":"article","venue":"Engineering Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":16,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Resilience (materials science); Modular design; Seismic isolation; Isolation (microbiology); Structural engineering; Engineering; Forensic engineering; Geology; Architectural engineering; Civil engineering; Computer science; Materials science; Composite material; Biology","score_opus":0.004537438532838836,"score_gpt":0.20714550540981755,"score_spread":0.20260806687697872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404198497","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.72402126,0.00011245473,0.2532888,0.00015181916,0.000033865548,0.000019341313,0.00006911821,0.0009602014,0.02134321],"genre_scores_gemma":[0.99021554,0.000021484952,0.008927058,0.000012452669,0.0000026866678,0.0000051941297,0.000026544394,0.000027243417,0.0007619078],"study_design_codex":"simulation_or_modeling","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998159,0.000030708554,0.0000048241877,0.000024111003,0.00007168956,0.000052966538],"domain_scores_gemma":[0.99978393,0.00005753333,0.000039219623,0.000045025034,0.000039469174,0.000034897726],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021952932,0.0005994301,0.00028102458,0.00044444393,0.0002848518,0.00056353776,0.000608342,0.00040491569,0.002970852],"category_scores_gemma":[0.0006080229,0.00021869157,0.00028512758,0.00023388903,0.0005584554,0.0006905428,0.0017855581,0.0004156142,0.0006180303],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00036604563,0.0003532183,0.004975394,0.00009993387,0.00004886295,0.00040525518,0.00032203723,0.7193707,0.16614404,0.010920333,0.0008554812,0.09613867],"study_design_scores_gemma":[0.000017586668,0.00036857123,0.0059095877,0.000020776539,0.000046008336,0.00024335344,0.0002995526,0.94777536,0.038107347,0.0048810327,0.00230174,0.000029191762],"about_ca_topic_score_codex":0.0009173642,"about_ca_topic_score_gemma":0.0021653313,"teacher_disagreement_score":0.002970852,"about_ca_system_score_codex":0.0002669076,"about_ca_system_score_gemma":0.0004809095,"threshold_uncertainty_score":0.0099384785},"labels":[],"label_agreement":null},{"id":"W4404251702","doi":"10.20533/ijcdse.2042.6364.2024.0610","title":"A Transformative Investigation of an Inclusive and Positive IEP Framework","year":2024,"lang":"en","type":"article","venue":"International Journal for Cross-Disciplinary Subjects in Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Northern British Columbia","funders":"","keywords":"Transformative learning; Psychology; Pedagogy; Sociology; Mathematics education","score_opus":0.008748660055980245,"score_gpt":0.34001137156876715,"score_spread":0.3312627115127869,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404251702","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.55267507,0.00062759756,0.06304302,0.022901341,0.00032096118,0.0010760388,0.000069624555,0.00015227398,0.35913408],"genre_scores_gemma":[0.9863579,0.000102075704,0.0070120827,0.00069321477,0.000009786048,0.000240796,0.00001323002,0.000040400435,0.0055305366],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.95558816,0.033086054,0.00060848624,0.0024401643,0.005505003,0.0027719992],"domain_scores_gemma":[0.9678648,0.019582296,0.0017909971,0.003293135,0.0047476212,0.002721172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.034627143,0.00072052074,0.0005067895,0.0029269948,0.020350873,0.017258346,0.0036064275,0.0028061448,0.0038481439],"category_scores_gemma":[0.03142696,0.00061899767,0.00058356737,0.0018289019,0.06209825,0.011355851,0.021290714,0.008859439,0.00035345898],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045611698,0.00028403278,0.0023574086,0.00014404085,0.000010027904,0.00088006794,0.6591742,0.00026730713,0.0012981778,0.30692443,0.00105424,0.027560472],"study_design_scores_gemma":[0.00002854651,0.00017630665,0.0028834927,0.00029386167,0.000014957466,0.00039380902,0.8557142,0.0012323104,0.001969855,0.07169193,0.0655607,0.000040073395],"about_ca_topic_score_codex":0.018420847,"about_ca_topic_score_gemma":0.030683821,"teacher_disagreement_score":0.034627143,"about_ca_system_score_codex":0.02341263,"about_ca_system_score_gemma":0.02833785,"threshold_uncertainty_score":0.183128},"labels":[],"label_agreement":null},{"id":"W4404333792","doi":"10.1115/detc2024-143598","title":"Elicitron: A Framework for Simulating Design Requirements Elicitation Using Large Language Model Agents","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Computer science; Requirements elicitation; Software engineering; Systems engineering; Programming language; Requirements analysis; Engineering; Software","score_opus":0.06904279386059138,"score_gpt":0.3412249124392414,"score_spread":0.27218211857865005,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404333792","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056320233,0.00002092731,0.99172276,0.0001353101,0.000009847536,0.00021674189,0.00006817498,0.0008902686,0.0013039274],"genre_scores_gemma":[0.11316191,0.000051020812,0.88473594,0.000079981146,0.000009733202,0.0007973302,0.00021359712,0.00015825246,0.00079227146],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99244577,0.0057750707,0.0003146829,0.00045360898,0.00080604997,0.00020478563],"domain_scores_gemma":[0.97801685,0.01780048,0.00085534796,0.0021476534,0.0008090644,0.00037066688],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010291768,0.001094777,0.00059548364,0.0014171496,0.0011611837,0.0021003375,0.0028143506,0.0018748188,0.0052632457],"category_scores_gemma":[0.02743792,0.0009497992,0.0014849848,0.0005810651,0.0023779178,0.002250243,0.0042097173,0.0019919295,0.00068994844],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003469607,0.00034140196,0.0028477947,0.00040468568,0.000105012834,0.0004992345,0.003930011,0.71513724,0.00865744,0.2015373,0.0020056553,0.06418718],"study_design_scores_gemma":[0.00006270272,0.00007161784,0.00011799781,0.000052678213,0.000016401014,0.00005269303,0.00022328015,0.95438164,0.0018975083,0.0352776,0.007819649,0.000026141897],"about_ca_topic_score_codex":0.0054041776,"about_ca_topic_score_gemma":0.009066512,"teacher_disagreement_score":0.010291768,"about_ca_system_score_codex":0.0016702883,"about_ca_system_score_gemma":0.0024707806,"threshold_uncertainty_score":0.054428756},"labels":[],"label_agreement":null},{"id":"W4404384074","doi":"10.21275/sr22425235646","title":"A Case Study on Planning and Scheduling of a Project PIPLMC of a Package - 6A using Microsoft Project 2016","year":2022,"lang":"en","type":"article","venue":"International Journal of Science and Research (IJSR)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Project planning; Project management; Computer science; Scheduling (production processes); Software engineering; Engineering management; Engineering; Systems engineering; Operations management","score_opus":0.1146416689681861,"score_gpt":0.4184759198305548,"score_spread":0.3038342508623687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404384074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8756388,0.0011161092,0.058475204,0.0011981248,0.00013366481,0.0012428497,0.0019125461,0.0007552023,0.059527468],"genre_scores_gemma":[0.91748005,0.0008717875,0.06071226,0.00005828509,0.000018666398,0.00037166584,0.0010756139,0.00015048396,0.019261215],"study_design_codex":"simulation_or_modeling","study_design_gemma":"case_report","domain_scores_codex":[0.9986082,0.0005132494,0.000104308456,0.00017060472,0.00038084557,0.0002228443],"domain_scores_gemma":[0.9984107,0.000664079,0.00018840123,0.00013329103,0.00025804446,0.0003454199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013471165,0.00051053596,0.0003541459,0.0012324689,0.0016203522,0.0014210383,0.0010984312,0.0011625604,0.0075422963],"category_scores_gemma":[0.0017954705,0.00041945477,0.00058610446,0.001978871,0.00056331843,0.00088281615,0.000763209,0.00082632457,0.0009069074],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0026220079,0.0031552268,0.04762638,0.0030726744,0.00017098135,0.06430606,0.014984519,0.4045786,0.041329056,0.03546215,0.029014684,0.3536777],"study_design_scores_gemma":[0.00063499965,0.0067824437,0.0777552,0.0010081213,0.00029634073,0.016780803,0.043622814,0.40351555,0.06836225,0.015051019,0.36579755,0.00039288623],"about_ca_topic_score_codex":0.016272178,"about_ca_topic_score_gemma":0.030499952,"teacher_disagreement_score":0.016272178,"about_ca_system_score_codex":0.0018572127,"about_ca_system_score_gemma":0.0026953137,"threshold_uncertainty_score":0.03235495},"labels":[],"label_agreement":null},{"id":"W4404512570","doi":"10.1111/mice.13365","title":"Reinforcement learning‐based approach for urban road project scheduling considering alternative closure types","year":2024,"lang":"en","type":"article","venue":"Computer-Aided Civil and Infrastructure Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Office of Naval Research; Stanford Bio-X","keywords":"Reinforcement; Reinforcement learning; Computer science; Scheduling (production processes); Closure (psychology); Engineering; Artificial intelligence; Operations management; Structural engineering; Economics","score_opus":0.008398849816529172,"score_gpt":0.20520311828917964,"score_spread":0.19680426847265048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404512570","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08931807,0.00054196676,0.9032272,0.00043395188,0.00007779267,0.00017036768,0.00006576577,0.000289706,0.0058751637],"genre_scores_gemma":[0.9405255,0.00017841364,0.05645534,0.000113417635,0.000042436688,0.00018102009,0.00007144181,0.000029024102,0.002403483],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99936205,0.0002384407,0.00003078725,0.00013858895,0.00010453165,0.00012571942],"domain_scores_gemma":[0.99822587,0.0010933304,0.0002347284,0.000042381766,0.00025276444,0.0001509268],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014220495,0.0009525433,0.0016006839,0.0006378991,0.0004715619,0.0009827637,0.0014440379,0.0011695509,0.0026171843],"category_scores_gemma":[0.0026002182,0.00058970234,0.00076760503,0.00050101714,0.00067858613,0.0007508762,0.0008428303,0.0011665662,0.00021064452],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035359422,0.00004091162,0.00043679573,0.000029752486,0.00002315204,0.000048009493,0.000023346134,0.9907165,0.00023122443,0.0011288199,0.00014892466,0.0071372096],"study_design_scores_gemma":[0.0000066977846,0.000016734557,0.000046097448,0.0000019783668,0.0000038429584,0.0000028013521,0.000004896504,0.9994516,0.000031871838,0.00037993895,0.000051673684,0.0000017915835],"about_ca_topic_score_codex":0.016224526,"about_ca_topic_score_gemma":0.011094597,"teacher_disagreement_score":0.016224526,"about_ca_system_score_codex":0.0012172295,"about_ca_system_score_gemma":0.001974275,"threshold_uncertainty_score":0.03226018},"labels":[],"label_agreement":null},{"id":"W4404645866","doi":"10.1080/01446193.2024.2431280","title":"Development of a prefabricated construction productivity estimation model through BIM and data augmentation processes","year":2024,"lang":"en","type":"article","venue":"Construction Management and Economics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia, Okanagan Campus; University of British Columbia; University of New Brunswick","funders":"Mitacs","keywords":"Productivity; Estimation; Engineering; Construction industry; Construction engineering; Computer science; Industrial engineering; Architectural engineering; Business; Civil engineering; Economics; Systems engineering; Economic growth","score_opus":0.03252959761123006,"score_gpt":0.24141016539348428,"score_spread":0.20888056778225422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404645866","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053869873,0.00007952681,0.9415628,0.00015099946,0.000026768688,0.00007838248,0.00042060358,0.000926274,0.002884764],"genre_scores_gemma":[0.693251,0.00022144543,0.3017298,0.000045901077,0.000017982511,0.0002983232,0.0010645657,0.000081898484,0.0032890984],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995498,0.00007559199,0.00002959522,0.0001265551,0.00017691546,0.0000414882],"domain_scores_gemma":[0.9994167,0.00019277196,0.00008389782,0.00006979594,0.00021696184,0.000019888124],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010734546,0.000625758,0.00044163968,0.00091346627,0.0002874468,0.001119488,0.0011978962,0.00067536667,0.0014341049],"category_scores_gemma":[0.0017371709,0.00068762206,0.0006716688,0.0010672412,0.00036112618,0.0012360411,0.0008273232,0.00095964444,0.0004925001],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024943136,0.000046639478,0.002215653,0.000028151344,0.0000126617515,0.000038925064,0.000038764585,0.958703,0.0016657359,0.0017466486,0.000345004,0.035133887],"study_design_scores_gemma":[0.0000014171632,0.0000074674876,0.00039335422,0.0000034555385,0.0000033873,0.000006539954,0.000007125078,0.99795246,0.00060341373,0.0005366392,0.00048106298,0.0000035557757],"about_ca_topic_score_codex":0.009910174,"about_ca_topic_score_gemma":0.009580565,"teacher_disagreement_score":0.009910174,"about_ca_system_score_codex":0.00088411843,"about_ca_system_score_gemma":0.0015744794,"threshold_uncertainty_score":0.019704938},"labels":[],"label_agreement":null},{"id":"W4404647673","doi":"10.5109/7323308","title":"Scan to BIM for Building Asset Management","year":2024,"lang":"en","type":"article","venue":"Proceedings of International Exchange and Innovation Conference on Engineering & Sciences (IEICES)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Advanced Micro Devices (Canada)","funders":"Universiti Tun Hussein Onn Malaysia","keywords":"Asset management; Facility management; Business; Asset (computer security); Construction engineering; Engineering; Computer science; Finance; Marketing; Computer security","score_opus":0.02675941931741522,"score_gpt":0.2780022829575381,"score_spread":0.2512428636401229,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404647673","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020288605,0.0044519277,0.87741286,0.0023412616,0.0004609171,0.00026354898,0.002268627,0.0061394046,0.086372964],"genre_scores_gemma":[0.22477561,0.00692025,0.74300086,0.00069811876,0.00018641575,0.0003916573,0.0041247834,0.00075768225,0.019144624],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99842834,0.00042753667,0.00008126543,0.00012888745,0.00086337724,0.000070559465],"domain_scores_gemma":[0.9991387,0.00022084605,0.00007966693,0.0002216823,0.00029843987,0.000040570154],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001143124,0.00069917925,0.0004987419,0.0030294764,0.00046585538,0.0024867686,0.0008693144,0.0006343531,0.010287806],"category_scores_gemma":[0.0026439014,0.00044132656,0.0008707863,0.0042825458,0.0006927836,0.0025657353,0.0025696321,0.0010042604,0.0033348335],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00005870724,0.0000867525,0.0036237293,0.0005553476,0.00008528121,0.00032259157,0.00068119547,0.02948962,0.006085945,0.13166574,0.0286007,0.7987445],"study_design_scores_gemma":[0.000027139862,0.00017230569,0.0069226455,0.00070827606,0.00011527397,0.0011858321,0.0016268698,0.18251546,0.019929765,0.13157122,0.6551043,0.00012092388],"about_ca_topic_score_codex":0.002690437,"about_ca_topic_score_gemma":0.0036546078,"teacher_disagreement_score":0.010287806,"about_ca_system_score_codex":0.0009626546,"about_ca_system_score_gemma":0.0013561171,"threshold_uncertainty_score":0.03441608},"labels":[],"label_agreement":null},{"id":"W4404741823","doi":"10.1061/jcemd4.coeng-15470","title":"Enhancing the Production Performance of Prefabricated Buildings through the Integrated Optimization of Precast Component Layout and Worker Allocation","year":2024,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Component (thermodynamics); Prefabrication; Production (economics); Architectural engineering; Computer science; Construction engineering; Engineering; Structural engineering","score_opus":0.00527542911631025,"score_gpt":0.18407553737239837,"score_spread":0.17880010825608814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404741823","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47782433,0.0006638366,0.5120246,0.00009627479,0.000040033723,0.00009463857,0.000100033976,0.0005176788,0.008638601],"genre_scores_gemma":[0.9363981,0.00018858784,0.062292054,0.000011742053,0.0000053946596,0.00004869295,0.00007365533,0.00004197851,0.00093984377],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99971086,0.000050737908,0.000010511701,0.000053968415,0.00010321858,0.00007068312],"domain_scores_gemma":[0.9997296,0.00010882076,0.000064324806,0.00003219092,0.00004753134,0.000017507278],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000513208,0.0012468054,0.00060407055,0.0005843931,0.0003527366,0.000859348,0.0005434114,0.00055248424,0.001210766],"category_scores_gemma":[0.0007660219,0.00041137074,0.00064627716,0.00052415376,0.000296492,0.0006018451,0.0006024204,0.00045316797,0.00021102405],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056656238,0.000082235056,0.0015108791,0.00010249692,0.000021224885,0.0000640837,0.00003119624,0.9375638,0.02671165,0.0005883563,0.00012654303,0.03314091],"study_design_scores_gemma":[0.000015193061,0.00026891544,0.0023528493,0.000009731704,0.000036591107,0.000031277774,0.000046549507,0.98278975,0.013114981,0.00067393255,0.00064635114,0.0000138221785],"about_ca_topic_score_codex":0.0027184144,"about_ca_topic_score_gemma":0.0048248633,"teacher_disagreement_score":0.0027184144,"about_ca_system_score_codex":0.0005905019,"about_ca_system_score_gemma":0.0009234749,"threshold_uncertainty_score":0.005405128},"labels":[],"label_agreement":null},{"id":"W4404832897","doi":"10.1177/10591478241305339","title":"Learning to Balance the Performance and Deterioration of Aging Systems Through Derating","year":2024,"lang":"en","type":"article","venue":"Production and Operations Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Queen's University","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Derating; Balance (ability); Computer science; Operations management; Economics; Business; Physical medicine and rehabilitation; Medicine; Engineering","score_opus":0.007426865914368767,"score_gpt":0.21358605453188936,"score_spread":0.20615918861752058,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404832897","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.27154255,0.00029909558,0.72411317,0.0005237287,0.0000417672,0.00007851557,0.000052429292,0.00041191507,0.0029367849],"genre_scores_gemma":[0.98499197,0.000076493605,0.014322516,0.000051471194,0.0000120224495,0.000026778669,0.000021304784,0.000014150017,0.00048341852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994854,0.00017279918,0.00002609243,0.000104290426,0.00009296106,0.00011842452],"domain_scores_gemma":[0.9970912,0.0019109981,0.00046875168,0.00014757313,0.00026142437,0.000120067336],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021706624,0.0008039105,0.0009042917,0.00042296003,0.00035593673,0.0008422787,0.0007101724,0.0007768143,0.0008873689],"category_scores_gemma":[0.0051058754,0.00042944544,0.00033681822,0.0002813495,0.0010408711,0.0011036431,0.00080662104,0.00094804214,0.00015651723],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049528306,0.000046486246,0.0008689766,0.000022757495,0.000012488036,0.000015541358,0.000033403976,0.98441535,0.0017792769,0.002035597,0.0001799062,0.0105406055],"study_design_scores_gemma":[0.000005513071,0.000032122043,0.00020252445,0.0000027126207,0.0000042373463,0.0000054108123,0.000007924835,0.9969693,0.0006615171,0.0020351545,0.0000701438,0.0000034112713],"about_ca_topic_score_codex":0.0046862597,"about_ca_topic_score_gemma":0.004561591,"teacher_disagreement_score":0.0046862597,"about_ca_system_score_codex":0.0009508346,"about_ca_system_score_gemma":0.0015696677,"threshold_uncertainty_score":0.011479735},"labels":[],"label_agreement":null},{"id":"W4404911138","doi":"10.2139/ssrn.5041538","title":"Automated 4d Clash Resolution and Scenario Planning for Complex Construction Workspaces","year":2024,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Workspace; Resolution (logic); Computer science; Process management; Business; Systems engineering; Engineering; Artificial intelligence; Robot","score_opus":0.014547181064534419,"score_gpt":0.2533197998998998,"score_spread":0.23877261883536535,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404911138","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019827748,0.00016068769,0.9703727,0.00009918941,0.000033237222,0.00016528236,0.000635241,0.0048050187,0.0039010006],"genre_scores_gemma":[0.27473477,0.00021210403,0.7200151,0.00003387973,0.000011359441,0.00014628583,0.0018754326,0.00069486466,0.0022761095],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99865,0.00031496474,0.00007548606,0.00026936174,0.000534488,0.00015567755],"domain_scores_gemma":[0.9987269,0.00046075272,0.00011223804,0.0003956103,0.00021809018,0.000086338594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00095969066,0.001750016,0.0016896535,0.0026908747,0.0011047776,0.00261419,0.0021354975,0.0016862738,0.0126372],"category_scores_gemma":[0.0034503152,0.0016475697,0.001495525,0.0021169651,0.00091181585,0.002101445,0.005727745,0.0015359335,0.0029737698],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000465988,0.00017554767,0.0027066804,0.00049622403,0.00011684866,0.00052236754,0.0010640708,0.46404076,0.023074213,0.017602662,0.0077401996,0.48199442],"study_design_scores_gemma":[0.00001832719,0.00004194119,0.0006347976,0.00004492747,0.000017593982,0.00013597336,0.0002836421,0.97186816,0.008050613,0.01303472,0.005832949,0.00003640746],"about_ca_topic_score_codex":0.007711474,"about_ca_topic_score_gemma":0.011744943,"teacher_disagreement_score":0.0126372,"about_ca_system_score_codex":0.00076975196,"about_ca_system_score_gemma":0.0018205425,"threshold_uncertainty_score":0.042275667},"labels":[],"label_agreement":null},{"id":"W4404998357","doi":"10.15376/biores.20.1.625-671","title":"Using prefabricated wood light-frame in multi-storey and non-residential construction projects: Motivations and barriers of professionals in Quebec","year":2024,"lang":"en","type":"article","venue":"BioResources","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Prefabrication; Economic shortage; Business; Viewpoints; Construction industry; Sampling frame; Productivity; Thematic analysis; Perception; Sample (material); Quality (philosophy); Frame (networking); Architectural engineering; Engineering; Marketing; Qualitative research; Civil engineering; Construction engineering; Psychology; Sociology; Population","score_opus":0.018341455213061006,"score_gpt":0.2578032059131962,"score_spread":0.2394617507001352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4404998357","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99777573,0.00009231136,0.00019953618,0.00036877478,0.0000041999065,0.000025840263,0.000038947477,0.000004099436,0.0014905796],"genre_scores_gemma":[0.9968876,0.00014075107,0.00026763103,0.00010455683,0.0000013722623,0.000016699523,0.00004049674,0.000004846102,0.002535863],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99740654,0.0005678816,0.00006839447,0.00026869072,0.0005707837,0.0011176799],"domain_scores_gemma":[0.994528,0.0014436779,0.00059109635,0.00009768799,0.0014632888,0.0018763321],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026881285,0.00036794154,0.0003151913,0.001027089,0.007250926,0.0027514282,0.0012409538,0.0010870032,0.0036863203],"category_scores_gemma":[0.004746934,0.00042372497,0.00021956115,0.0015878448,0.0029003697,0.0009724415,0.002212561,0.0008923855,0.00025840645],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019535744,0.00047396112,0.31408617,0.0002837958,0.000019904806,0.0021892365,0.63099736,0.00032660054,0.0053629577,0.0020509262,0.0028564383,0.04115724],"study_design_scores_gemma":[0.000008074382,0.00013790972,0.18957944,0.0002177888,0.0000114074965,0.00027322097,0.7974407,0.0010612224,0.0004467892,0.00013466869,0.01064092,0.000047796242],"about_ca_topic_score_codex":0.9212231,"about_ca_topic_score_gemma":0.97233015,"teacher_disagreement_score":0.078776896,"about_ca_system_score_codex":0.022297155,"about_ca_system_score_gemma":0.029894019,"threshold_uncertainty_score":0.16177797},"labels":[],"label_agreement":null},{"id":"W4405076000","doi":"10.3390/infrastructures9120220","title":"Developing an Ontology for Concrete Surface Defects to Enhance Inspection, Diagnosis and Repair Information Modeling","year":2024,"lang":"en","type":"article","venue":"Infrastructures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Ontology; Building information modeling; Computer science; Information model; Asset (computer security); Field (mathematics); Asset management; Systems engineering; Knowledge management; Risk analysis (engineering); Data science; Construction engineering; Software engineering; Engineering; Business; Operations management","score_opus":0.009852343939144172,"score_gpt":0.2606218963007215,"score_spread":0.25076955236157733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405076000","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01886578,0.00034572158,0.9586584,0.0011958682,0.000097328324,0.00065375405,0.002582307,0.0009367261,0.016664067],"genre_scores_gemma":[0.08678998,0.0006650218,0.9036612,0.00019424355,0.000018788765,0.0006075448,0.004615174,0.00013284072,0.003315366],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9976572,0.0005489579,0.0005017766,0.00029634172,0.0008098871,0.00018577179],"domain_scores_gemma":[0.99718577,0.000997176,0.00030328523,0.00051486597,0.00086656655,0.00013237992],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003789468,0.00046052184,0.00053160463,0.004664988,0.0011368251,0.0028127132,0.0013487771,0.0011471994,0.0019513791],"category_scores_gemma":[0.0055991565,0.0005415182,0.001822169,0.0045656348,0.0012455875,0.0058900137,0.0022588808,0.0017738678,0.0005664012],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008275823,0.0003623085,0.009022087,0.0012667374,0.00010015686,0.0013611751,0.009259658,0.026879907,0.013821997,0.6731125,0.014319198,0.25041157],"study_design_scores_gemma":[0.000056813074,0.000104683255,0.007971769,0.0013584039,0.0002595904,0.0020117604,0.0068574036,0.1643571,0.013438052,0.15726201,0.64616066,0.00016177657],"about_ca_topic_score_codex":0.020454466,"about_ca_topic_score_gemma":0.027875206,"teacher_disagreement_score":0.020454466,"about_ca_system_score_codex":0.002477285,"about_ca_system_score_gemma":0.006295495,"threshold_uncertainty_score":0.040670812},"labels":[],"label_agreement":null},{"id":"W4405098744","doi":"10.22215/etd/2024-16282","title":"Advanced Visualization of Discrete-Event Systems Specification in 3D Building Information Modeling using Autodesk Forge Platform","year":2024,"lang":"en","type":"dissertation","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"DEVS; Building information modeling; Systems engineering; Discrete event simulation; Computer science; Information model; Efficient energy use; Energy performance; Engineering; Event (particle physics); Visualization; Architecture; Architectural engineering; Software engineering; Modeling and simulation; Simulation; Mechanical engineering","score_opus":0.014342433155362848,"score_gpt":0.27672069810880306,"score_spread":0.26237826495344024,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405098744","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03338245,0.00015566612,0.9333536,0.00035558938,0.00011552072,0.00017953289,0.0021670396,0.011645925,0.018644817],"genre_scores_gemma":[0.5171649,0.00074264564,0.4612363,0.00016425528,0.000034947494,0.000643521,0.0055038184,0.002021451,0.012488155],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99969983,0.000060460232,0.000021673157,0.000039169416,0.00015368374,0.000025161164],"domain_scores_gemma":[0.99956745,0.00020661109,0.000025188105,0.00008217356,0.00009366008,0.000024966172],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006851488,0.00081264804,0.00043432094,0.00055312726,0.00036403455,0.0019609046,0.0007909178,0.00067031564,0.010892608],"category_scores_gemma":[0.0012320352,0.00046991376,0.00089453213,0.00037484584,0.00034631585,0.0008507635,0.0011047097,0.0011325437,0.0014251331],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022865972,0.0002489467,0.0035758608,0.00061458565,0.000063748375,0.0006591529,0.0016106913,0.76150864,0.026046589,0.059158176,0.02127264,0.1250123],"study_design_scores_gemma":[0.000027904796,0.000037989084,0.00059609313,0.000040777097,0.000009771229,0.00009322994,0.00011047091,0.9537205,0.00863792,0.005977574,0.030716343,0.000031399588],"about_ca_topic_score_codex":0.0035601468,"about_ca_topic_score_gemma":0.004459406,"teacher_disagreement_score":0.010892608,"about_ca_system_score_codex":0.00041875357,"about_ca_system_score_gemma":0.0009216035,"threshold_uncertainty_score":0.03643936},"labels":[],"label_agreement":null},{"id":"W4405266280","doi":"10.31219/osf.io/vgbh6","title":"Utilizing Foundation Models to Enhance Autonomous Robotic Systems in Dynamic and Unstructured Environments","year":2024,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Robotics; Adaptability; Artificial intelligence; Foundation (evidence); Autonomy; Computer science; Benchmark (surveying); Robot; Generalization; Human–computer interaction; Management","score_opus":0.011230059683741741,"score_gpt":0.23182953879485205,"score_spread":0.2205994791111103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405266280","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.053886946,0.00046835293,0.9362086,0.00040035826,0.000048663554,0.000065750115,0.000106132655,0.0010985935,0.0077165305],"genre_scores_gemma":[0.7091143,0.00087463047,0.28612593,0.00010575489,0.000024274008,0.00014549009,0.00038297844,0.00022964827,0.0029970342],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932635,0.00022725163,0.000030810235,0.000094496165,0.0002401847,0.00008091123],"domain_scores_gemma":[0.99878734,0.0005351302,0.00013720024,0.0002861536,0.00017665581,0.00007755806],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009333867,0.0010302087,0.0005926713,0.00062254193,0.00057780417,0.0016667861,0.0010657965,0.0008615387,0.0024927575],"category_scores_gemma":[0.0029110084,0.0004892722,0.0007377807,0.00039397163,0.0011735992,0.0040380317,0.0032880455,0.0010827224,0.00059918285],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012858334,0.00021883259,0.0031667254,0.00047066587,0.000094337905,0.00028223786,0.00079693843,0.6879409,0.016742062,0.12264029,0.0024985687,0.16501988],"study_design_scores_gemma":[0.000014398782,0.00010184393,0.00055752543,0.00005342587,0.000029161944,0.000101026795,0.00020566957,0.91866386,0.0045277113,0.0684463,0.0072680213,0.000031121926],"about_ca_topic_score_codex":0.0032456997,"about_ca_topic_score_gemma":0.0057257167,"teacher_disagreement_score":0.0032456997,"about_ca_system_score_codex":0.0006710172,"about_ca_system_score_gemma":0.0015652812,"threshold_uncertainty_score":0.008339107},"labels":[],"label_agreement":null},{"id":"W4405327131","doi":"10.1007/978-3-031-61535-1_21","title":"Structural Performance of Novel Steel Connection for Indigenous Modular Houses","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Lakehead University","funders":"","keywords":"Indigenous; Modular design; Connection (principal bundle); Computer science; Structural engineering; Engineering; Programming language; Biology; Ecology","score_opus":0.01016942097514847,"score_gpt":0.19429315492048282,"score_spread":0.18412373394533435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405327131","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98963416,0.00006317912,0.0023239218,0.000012615907,0.000024214121,0.0000059450276,0.000077190976,0.00011741854,0.007741484],"genre_scores_gemma":[0.99593866,0.00003068454,0.00086705945,0.0000032055325,0.000003327776,0.0000026812925,0.000073821604,0.000020220812,0.003060378],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998148,0.000023050738,0.000005070446,0.000036136953,0.00008176351,0.000039106206],"domain_scores_gemma":[0.9997925,0.000032006643,0.000025247053,0.00003551811,0.000077296354,0.000037337424],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00024401632,0.00041649432,0.00026717008,0.00038555035,0.00035125704,0.0004031138,0.00078464125,0.0003940238,0.0077537135],"category_scores_gemma":[0.0004504562,0.00017568894,0.00025045668,0.00036093482,0.00029598814,0.00037376856,0.000391406,0.00021275648,0.0010655092],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022153864,0.00037028544,0.005820707,0.00028204534,0.000057061698,0.0006547106,0.00052926765,0.06918074,0.84571105,0.00250728,0.0024656558,0.07020589],"study_design_scores_gemma":[0.00019305007,0.011014846,0.104867615,0.00008369762,0.00037005765,0.00093192223,0.0014303839,0.26670915,0.59535146,0.0013953422,0.017546762,0.00010567946],"about_ca_topic_score_codex":0.0013597453,"about_ca_topic_score_gemma":0.0034961614,"teacher_disagreement_score":0.0077537135,"about_ca_system_score_codex":0.00033229683,"about_ca_system_score_gemma":0.00022105969,"threshold_uncertainty_score":0.02593869},"labels":[],"label_agreement":null},{"id":"W4405329716","doi":"10.1007/978-3-031-61535-1","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 12","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Engineering ethics; Library science; Engineering; Environmental ethics; Law; Computer science; Philosophy; Thermodynamics; Physics","score_opus":0.00569883840875154,"score_gpt":0.17677103569564137,"score_spread":0.17107219728688983,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405329716","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031364697,0.019121313,0.0036676985,0.028682733,0.063718826,0.00019367997,0.006678796,0.0008917035,0.8739088],"genre_scores_gemma":[0.0033375523,0.0046591186,0.0008559539,0.0006047331,0.0008084456,0.000025626006,0.0019299099,0.00019369637,0.98758507],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99856734,0.000071794566,0.000023402634,0.00007891335,0.0010518339,0.0002066346],"domain_scores_gemma":[0.99782073,0.00006866015,0.000021712158,0.000052430423,0.0015880396,0.00044835152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015164677,0.0012487699,0.00094342284,0.0019092298,0.0027493525,0.0055211973,0.001365593,0.0019140263,0.2929566],"category_scores_gemma":[0.0015968067,0.00046798133,0.00051803555,0.0024583263,0.0010161923,0.0014723074,0.0017745306,0.001911318,0.10250032],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001712327,0.000018676546,0.00010522828,0.00004196872,0.0000023082268,0.000014624535,0.000022936247,0.0000816847,0.00018767721,0.0011595935,0.97256166,0.025786467],"study_design_scores_gemma":[0.00000350151,0.0000051250754,0.00061614066,0.000039665672,0.000003557689,0.00001286645,0.00009333048,0.00014176106,0.00014514748,0.0004984672,0.9984341,0.000006282872],"about_ca_topic_score_codex":0.47775513,"about_ca_topic_score_gemma":0.75661904,"teacher_disagreement_score":0.5222449,"about_ca_system_score_codex":0.008142428,"about_ca_system_score_gemma":0.02723001,"threshold_uncertainty_score":0.98003745},"labels":[],"label_agreement":null},{"id":"W4405431381","doi":"10.1016/j.autcon.2024.105937","title":"Sensor adoption in the construction industry: Barriers, opportunities, and strategies","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Construction industry; Engineering; Construction engineering; Business; Manufacturing engineering; Computer science; Engineering management","score_opus":0.018231657081341373,"score_gpt":0.23212504588696073,"score_spread":0.21389338880561937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405431381","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6253263,0.26638016,0.016742064,0.06650988,0.0005891662,0.0010716787,0.00041592921,0.000077535,0.022887291],"genre_scores_gemma":[0.9145868,0.07350982,0.0072803246,0.0030947386,0.000071346985,0.00061814365,0.00011833982,0.00003001193,0.0006905529],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.93291277,0.038166393,0.008672983,0.002668955,0.014425923,0.0031529628],"domain_scores_gemma":[0.8141721,0.15112315,0.01660613,0.0015911362,0.014651113,0.0018563331],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.06710612,0.00055515073,0.0010978966,0.006951602,0.0022385132,0.0068206014,0.0016574836,0.0018589735,0.0013312319],"category_scores_gemma":[0.10125848,0.00080480915,0.0013844881,0.009367822,0.003998377,0.0083185155,0.0056350776,0.002196835,0.0001512884],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003107516,0.00035769917,0.16857822,0.0779104,0.0010091158,0.001933448,0.19141157,0.0016452718,0.0020545404,0.06091643,0.00537423,0.48849836],"study_design_scores_gemma":[0.000085547006,0.00071185676,0.10915321,0.11280082,0.0014047172,0.0023745198,0.5963949,0.0022646363,0.0028245945,0.025950972,0.1458008,0.00023342697],"about_ca_topic_score_codex":0.0118827475,"about_ca_topic_score_gemma":0.014895073,"teacher_disagreement_score":0.06710612,"about_ca_system_score_codex":0.007867579,"about_ca_system_score_gemma":0.022953019,"threshold_uncertainty_score":0.35489535},"labels":[],"label_agreement":null},{"id":"W4405495783","doi":"10.1007/978-3-031-61503-0_4","title":"Understanding Design Issue Management and Coordination Processes When Using Cloud-Based BIM","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Cloud computing; Systems engineering; Process management; Computer science; Engineering; Operating system","score_opus":0.03414662012955203,"score_gpt":0.21226919085818605,"score_spread":0.17812257072863402,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405495783","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11140998,0.0011287871,0.8048394,0.0033793333,0.00014563139,0.000292115,0.0004565355,0.0012658573,0.07708241],"genre_scores_gemma":[0.6307448,0.0011947261,0.35729772,0.00020611462,0.000035721598,0.00013095522,0.0007662894,0.00040064,0.009223038],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99808323,0.0006765503,0.00011739696,0.00023914858,0.0006329632,0.00025064778],"domain_scores_gemma":[0.9936293,0.0043521584,0.00053317985,0.00069754035,0.00061299576,0.00017483461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028897265,0.0004967831,0.00036654132,0.0012517644,0.0010056525,0.0085678315,0.0012386227,0.0012560466,0.0072007524],"category_scores_gemma":[0.012330686,0.00080474856,0.0005364039,0.0021493256,0.001228697,0.010241069,0.0020391888,0.0019025374,0.001127602],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018600881,0.00044407023,0.017046012,0.0005386852,0.00006760851,0.0008423381,0.015944604,0.059087936,0.014798777,0.45925918,0.012446369,0.4193384],"study_design_scores_gemma":[0.00003269348,0.00006477447,0.011103115,0.00047002014,0.0000875538,0.000587242,0.013697026,0.53229266,0.012308162,0.34287432,0.086415514,0.0000669233],"about_ca_topic_score_codex":0.011498411,"about_ca_topic_score_gemma":0.015415257,"teacher_disagreement_score":0.011498411,"about_ca_system_score_codex":0.0016518467,"about_ca_system_score_gemma":0.0029029164,"threshold_uncertainty_score":0.02408892},"labels":[],"label_agreement":null},{"id":"W4405495987","doi":"10.1007/978-3-031-61503-0_15","title":"Integrating Building Information Modeling (BIM), Universal Design (UD) Standards, and Age-In-Place Requirements at the Conceptual Design Stage of Houses","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Conceptual design; Systems engineering; Architectural engineering; Computer science; Engineering; Construction engineering; Engineering drawing; Software engineering; Mechanical engineering; Operations management","score_opus":0.019568001966087194,"score_gpt":0.2205850427103505,"score_spread":0.20101704074426333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405495987","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.023585446,0.0016267066,0.5745843,0.0010000843,0.00014728698,0.000086916145,0.00019988719,0.00076546514,0.3980039],"genre_scores_gemma":[0.40913248,0.0038738516,0.4634007,0.0002930429,0.00006696946,0.00010649593,0.0011868583,0.00066819316,0.12127134],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991499,0.00025016564,0.00004621676,0.000051802486,0.0004227748,0.00007902839],"domain_scores_gemma":[0.9996637,0.00013055713,0.000021786973,0.000080594866,0.00008409882,0.000019206667],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011821379,0.00036136605,0.00022075407,0.00089794234,0.0004415645,0.0029415383,0.0008763554,0.0005859332,0.0040288637],"category_scores_gemma":[0.0014404038,0.00051653193,0.00037361216,0.0012759094,0.0008280496,0.0029724496,0.0015817358,0.00085149705,0.0011200849],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013583494,0.000043316468,0.0010147183,0.00019409783,0.000010539453,0.00019631929,0.0020858347,0.017854113,0.0039778873,0.67125523,0.009320468,0.29403397],"study_design_scores_gemma":[0.000004262197,0.00007582302,0.0036646866,0.0004685556,0.000037483678,0.0006635997,0.0028476864,0.05051931,0.01552473,0.27646074,0.6496984,0.000034787117],"about_ca_topic_score_codex":0.0040489733,"about_ca_topic_score_gemma":0.010959345,"teacher_disagreement_score":0.0040489733,"about_ca_system_score_codex":0.0010355696,"about_ca_system_score_gemma":0.0013443213,"threshold_uncertainty_score":0.013477862},"labels":[],"label_agreement":null},{"id":"W4405496000","doi":"10.1007/978-3-031-61503-0_24","title":"Methods to Develop a Comprehensive Rule-Based Clash Avoidance System Based on Expert Opinion","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Expert opinion; Computer science; Rule-based system; Artificial intelligence; Medicine","score_opus":0.015724797161185144,"score_gpt":0.2529409520261787,"score_spread":0.2372161548649936,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496000","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032387434,0.00003792186,0.99158454,0.000046335837,0.000019317418,0.00022909408,0.00013154035,0.0028519295,0.0018605244],"genre_scores_gemma":[0.061222054,0.000067500136,0.9338805,0.00009981078,0.000018804,0.00040323837,0.00076042156,0.00018021146,0.003367352],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9981139,0.00023327103,0.00018713275,0.00046919577,0.00091193174,0.00008460401],"domain_scores_gemma":[0.99687,0.0011550897,0.00015220148,0.0002772883,0.0014629433,0.00008238718],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021843319,0.00091930485,0.001008911,0.0018737662,0.00065478554,0.0020437886,0.0026067435,0.0011585393,0.009504113],"category_scores_gemma":[0.006997428,0.00053918967,0.001116905,0.0010416737,0.00046976173,0.0016880287,0.0014522107,0.0011544714,0.00396821],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015016519,0.0004086731,0.0021880444,0.00034048365,0.00018877356,0.0002955748,0.0004906122,0.062253617,0.01988177,0.011659698,0.009563892,0.8925788],"study_design_scores_gemma":[0.00004209764,0.000084136074,0.0007950122,0.000069091,0.00011531414,0.00015270655,0.00014527017,0.96803576,0.013013417,0.0098047415,0.007705167,0.0000373473],"about_ca_topic_score_codex":0.0072202533,"about_ca_topic_score_gemma":0.010857766,"teacher_disagreement_score":0.009504113,"about_ca_system_score_codex":0.0006927176,"about_ca_system_score_gemma":0.001814513,"threshold_uncertainty_score":0.03179443},"labels":[],"label_agreement":null},{"id":"W4405496053","doi":"10.1007/978-3-031-61503-0_16","title":"A BIM-Centric Decision-Making Supporting Tool for Material Selection During Early Design Stages of Building Envelope","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Envelope (radar); Selection (genetic algorithm); Building envelope; Architectural engineering; Engineering; Construction engineering; Computer science; Systems engineering; Process management; Artificial intelligence; Geography; Aerospace engineering","score_opus":0.006705616666849951,"score_gpt":0.2160106053733731,"score_spread":0.20930498870652314,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496053","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053449012,0.000098865836,0.9725903,0.00008429573,0.000060838644,0.00009406245,0.000709914,0.013607179,0.007409672],"genre_scores_gemma":[0.088292874,0.00019083399,0.90142155,0.00012883752,0.00002639638,0.00022260087,0.0019542016,0.0010966584,0.0066660005],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932706,0.00010012557,0.000047259226,0.00009273693,0.0003826034,0.000050147723],"domain_scores_gemma":[0.9990908,0.00041554563,0.000058676625,0.00017280922,0.00019300502,0.000069123984],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012503517,0.001201069,0.000826924,0.0014911381,0.0004750648,0.0021303277,0.0019424953,0.0011293746,0.012630609],"category_scores_gemma":[0.0021220047,0.0007785844,0.00070661533,0.0011029247,0.00034947373,0.0014459161,0.0020383252,0.00086560694,0.0044707754],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048571336,0.0004886697,0.0014595636,0.0004880503,0.00009933629,0.000587456,0.0006695143,0.076093435,0.060741104,0.021080095,0.04270952,0.7950976],"study_design_scores_gemma":[0.00009021283,0.00017970896,0.0018602663,0.00017605098,0.00008843691,0.0005352817,0.00021765493,0.80824333,0.06504098,0.024932627,0.09851535,0.000120108554],"about_ca_topic_score_codex":0.0012062083,"about_ca_topic_score_gemma":0.00227572,"teacher_disagreement_score":0.012630609,"about_ca_system_score_codex":0.00029730157,"about_ca_system_score_gemma":0.0009986616,"threshold_uncertainty_score":0.042253613},"labels":[],"label_agreement":null},{"id":"W4405496074","doi":"10.1007/978-3-031-61503-0_34","title":"Comparative Analyses of Four BIM-Based Compliance Checking Tools","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université Laval; Natural Sciences and Engineering Research Council of Canada","funders":"","keywords":"Compliance (psychology); Computer science; Psychology; Social psychology","score_opus":0.07434731182979668,"score_gpt":0.28490797360839987,"score_spread":0.2105606617786032,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496074","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6562312,0.0016212418,0.30208096,0.00028158832,0.00012812602,0.00038266872,0.0016876304,0.009930231,0.027656285],"genre_scores_gemma":[0.86230105,0.00034968177,0.13120633,0.000055451776,0.000016782597,0.00018800466,0.0021431874,0.0007395781,0.0029999698],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9886275,0.0032682251,0.000588572,0.0006292598,0.0061350917,0.00075131404],"domain_scores_gemma":[0.94978184,0.03632261,0.0015557102,0.0043364987,0.00775971,0.00024369193],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006992052,0.0011260766,0.0009478773,0.0062555154,0.00083019736,0.0028813004,0.0025582425,0.0012672776,0.006170872],"category_scores_gemma":[0.030643875,0.0006882158,0.0011145253,0.005477482,0.0012728979,0.0035489933,0.0018779384,0.00075622025,0.0009592427],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0057208077,0.0011409074,0.031807005,0.0016810292,0.0005366084,0.0004053367,0.0016601008,0.1970827,0.039873503,0.037926998,0.0075744567,0.67459047],"study_design_scores_gemma":[0.00022008932,0.0011686276,0.022414207,0.00019762953,0.0006457648,0.00026711315,0.001051057,0.86477894,0.09167225,0.008056267,0.009394227,0.00013390699],"about_ca_topic_score_codex":0.005430769,"about_ca_topic_score_gemma":0.006016793,"teacher_disagreement_score":0.006992052,"about_ca_system_score_codex":0.0014551835,"about_ca_system_score_gemma":0.001888865,"threshold_uncertainty_score":0.036977947},"labels":[],"label_agreement":null},{"id":"W4405496145","doi":"10.1007/978-3-031-61503-0","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 5","year":2024,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Engineering ethics; Engineering; Library science; Environmental ethics; Computer science; Physics; Philosophy; Thermodynamics","score_opus":0.005352233019658831,"score_gpt":0.17737056693712064,"score_spread":0.1720183339174618,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405496145","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031263765,0.01803926,0.0034126113,0.02805362,0.06704014,0.0001986021,0.005371108,0.00081079704,0.8739473],"genre_scores_gemma":[0.003525643,0.0046276776,0.00085883157,0.00067959254,0.00091916515,0.000025814272,0.0018419491,0.00018276671,0.98733866],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9984723,0.00007749671,0.00002481585,0.000078404606,0.001129296,0.00021767452],"domain_scores_gemma":[0.997686,0.00007088253,0.000022568815,0.000055206845,0.0016719586,0.0004932739],"candidate_categories":["insufficient_payload"],"consensus_categories":["insufficient_payload"],"category_scores_codex":[0.0015426464,0.0012040014,0.00087829016,0.0019241276,0.0026850558,0.005547299,0.0013730695,0.0020180352,0.31473246],"category_scores_gemma":[0.0016266761,0.00044278248,0.00055685715,0.0023508507,0.0009872307,0.0014564873,0.0018850797,0.0019825103,0.11387769],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017616843,0.000020841544,0.00010840509,0.00004627269,0.0000025184395,0.000016958928,0.000023977374,0.00008691699,0.00022769526,0.0012256085,0.97142303,0.026800176],"study_design_scores_gemma":[0.0000034375264,0.0000054992424,0.00062965753,0.000043993834,0.000003613976,0.000013870564,0.00009501826,0.00013550097,0.00014666471,0.00046324695,0.99845314,0.0000064707865],"about_ca_topic_score_codex":0.4289583,"about_ca_topic_score_gemma":0.7208565,"teacher_disagreement_score":0.9922529,"about_ca_system_score_codex":0.007747138,"about_ca_system_score_gemma":0.02513385,"threshold_uncertainty_score":0.97745097},"labels":[],"label_agreement":null},{"id":"W4405505932","doi":"10.1016/j.autcon.2024.105933","title":"Egocentric-video-based construction quality supervision (EgoConQS): Application of automatic key activity queries","year":2024,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"National Key Research and Development Program of China; Natural Science Foundation of Hunan Province; National Natural Science Foundation of China","keywords":"Key (lock); Quality (philosophy); Computer science; Human–computer interaction; Engineering drawing; Computer vision; Computer graphics (images); Engineering; Computer security","score_opus":0.009394161564362132,"score_gpt":0.25239538147606716,"score_spread":0.24300121991170504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405505932","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15340151,0.00083231356,0.8128172,0.00030389518,0.00009370638,0.0011841084,0.007821835,0.013160977,0.010384377],"genre_scores_gemma":[0.6784043,0.00053292676,0.3068186,0.00011081135,0.000045799923,0.0005574007,0.009647978,0.00036562915,0.0035165434],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99841166,0.00032948065,0.00012470353,0.00040849092,0.0006125065,0.000113125556],"domain_scores_gemma":[0.99654007,0.0007940689,0.00066545466,0.0005587419,0.0012978362,0.0001438248],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013454842,0.0008876061,0.000532894,0.0034319356,0.00032036484,0.00082308415,0.00094519486,0.00057324005,0.0015878689],"category_scores_gemma":[0.0063011544,0.00020795368,0.00030274846,0.0022088953,0.0003208334,0.0019204216,0.001504213,0.00047649638,0.00092299544],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007114394,0.0003150689,0.05513154,0.0010976522,0.00012228174,0.00033730536,0.0021422734,0.01980897,0.03952678,0.007917448,0.021855341,0.8510339],"study_design_scores_gemma":[0.000077978424,0.00065898825,0.11405623,0.00028522834,0.00015540478,0.00094072905,0.003506243,0.7089145,0.08706161,0.016018182,0.06811349,0.00021144564],"about_ca_topic_score_codex":0.009819293,"about_ca_topic_score_gemma":0.013093594,"teacher_disagreement_score":0.009819293,"about_ca_system_score_codex":0.00067102164,"about_ca_system_score_gemma":0.0010540541,"threshold_uncertainty_score":0.019524276},"labels":[],"label_agreement":null},{"id":"W4405533087","doi":"10.3390/buildings14124021","title":"BIM-Based Automatic Extraction of Daily Concrete and Formwork Requirements for Site Work Planning","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Formwork; Work (physics); Engineering; Construction engineering; Extraction (chemistry); Civil engineering; Computer science; Mechanical engineering","score_opus":0.016560256404014793,"score_gpt":0.2649086260695112,"score_spread":0.24834836966549642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405533087","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019557571,0.00016620103,0.96126425,0.00005530777,0.000029415058,0.00026491814,0.003248556,0.010894408,0.0045193722],"genre_scores_gemma":[0.17805178,0.0003450613,0.8060131,0.0000345622,0.000018705641,0.0004138229,0.012130131,0.000854794,0.0021380296],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988514,0.0001335795,0.0000732053,0.0002296822,0.0005993502,0.00011274286],"domain_scores_gemma":[0.9993241,0.00014061444,0.00009232553,0.00012514132,0.0002687563,0.000049117167],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007914923,0.0012013746,0.0009405983,0.0048146234,0.00048521106,0.0015210885,0.0010273345,0.00065244583,0.0038287733],"category_scores_gemma":[0.00229775,0.0007580283,0.0013400913,0.0026687079,0.00034456432,0.001534199,0.0018369517,0.0007087654,0.0032168482],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022253627,0.0002990406,0.010394675,0.00075340754,0.00010707263,0.00052084273,0.0012115339,0.1419586,0.04990897,0.011502187,0.019084942,0.7640361],"study_design_scores_gemma":[0.000024421332,0.00007799139,0.014333804,0.00012223331,0.000052658495,0.00040297335,0.00057083124,0.9182432,0.026433539,0.006164472,0.03348363,0.00009030867],"about_ca_topic_score_codex":0.007944267,"about_ca_topic_score_gemma":0.01582835,"teacher_disagreement_score":0.007944267,"about_ca_system_score_codex":0.00056044845,"about_ca_system_score_gemma":0.0015111335,"threshold_uncertainty_score":0.015796006},"labels":[],"label_agreement":null},{"id":"W4405738502","doi":"10.1016/j.jobe.2024.111613","title":"Seismic properties, calculation method, and equivalent model of internal connection in modular steel building","year":2024,"lang":"en","type":"article","venue":"Journal of Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"National Natural Science Foundation of China","keywords":"Connection (principal bundle); Modular design; Structural engineering; Computer science; Engineering; Programming language","score_opus":0.017811585258465035,"score_gpt":0.24258660548369754,"score_spread":0.2247750202252325,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405738502","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14119095,0.00027210973,0.84236056,0.0001234425,0.000053564523,0.000034274362,0.00015865876,0.00029496165,0.0155114345],"genre_scores_gemma":[0.959385,0.0002679213,0.03268247,0.00002928236,0.000024383404,0.00005413049,0.00018623362,0.00011336822,0.007257303],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99985874,0.00004335678,0.00000613131,0.000024983523,0.000052974217,0.000013893984],"domain_scores_gemma":[0.99989426,0.000038230573,0.0000130148555,0.000012899762,0.00003481083,0.0000068476347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00022446108,0.00047427483,0.00040368544,0.00052401115,0.00030208763,0.00042252277,0.0008503218,0.00061434985,0.0020920339],"category_scores_gemma":[0.00047714042,0.000322261,0.00053891045,0.00068863074,0.0004197181,0.00080128486,0.00030251447,0.000377064,0.0004179904],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000036593625,0.00006502395,0.0014902786,0.000072369476,0.000018715005,0.00020447849,0.00009635355,0.9321379,0.010178098,0.026368685,0.00088631274,0.028445106],"study_design_scores_gemma":[0.0000021684996,0.0000072566017,0.00033529446,0.0000027228248,0.000005989658,0.00004082051,0.000017689672,0.9968828,0.00054360216,0.0017884322,0.0003693362,0.0000039728025],"about_ca_topic_score_codex":0.004491134,"about_ca_topic_score_gemma":0.0043014092,"teacher_disagreement_score":0.004491134,"about_ca_system_score_codex":0.00030146504,"about_ca_system_score_gemma":0.0005035431,"threshold_uncertainty_score":0.008929968},"labels":[],"label_agreement":null},{"id":"W4405801857","doi":"10.1016/j.buildenv.2024.112503","title":"Decarbonising construction equipment: Management practices and strategies for net zero in UK infrastructure projects","year":2024,"lang":"en","type":"article","venue":"Building and Environment","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan College","funders":"Northumbria University","keywords":"Zero emission; Zero (linguistics); Net (polyhedron); Business; Engineering; Waste management; Mathematics","score_opus":0.010246063324824754,"score_gpt":0.22756860703271709,"score_spread":0.21732254370789233,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405801857","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9232254,0.002765181,0.0094017275,0.0073379967,0.00008986544,0.00013671593,0.00014712407,0.00015053776,0.056745358],"genre_scores_gemma":[0.98615766,0.0012312006,0.0046560196,0.00017791832,0.0000070690908,0.000033313758,0.00008930422,0.000021461812,0.007626229],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99694663,0.00081392884,0.00027396283,0.00026312371,0.0010537663,0.00064853835],"domain_scores_gemma":[0.9961248,0.0008422627,0.0009063104,0.00033225882,0.0011168473,0.0006775553],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0042027906,0.00040077209,0.00024088412,0.0016506889,0.0016824924,0.004660316,0.0013049863,0.0009096131,0.004136768],"category_scores_gemma":[0.0064284224,0.00021751455,0.0002425298,0.0025027667,0.0015603557,0.0026539227,0.00557475,0.0010526679,0.00040178618],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004324037,0.0003133432,0.12998812,0.0020354688,0.0000713674,0.0011810695,0.053239837,0.009477277,0.012973652,0.09961408,0.010510276,0.68016315],"study_design_scores_gemma":[0.000030799914,0.0009420275,0.55545485,0.0038662744,0.0001150343,0.0010864303,0.14395005,0.007875519,0.007648047,0.025342131,0.25350726,0.00018153113],"about_ca_topic_score_codex":0.019039618,"about_ca_topic_score_gemma":0.05576008,"teacher_disagreement_score":0.019039618,"about_ca_system_score_codex":0.0082992315,"about_ca_system_score_gemma":0.009028693,"threshold_uncertainty_score":0.060215414},"labels":[],"label_agreement":null},{"id":"W4405857815","doi":"10.1007/978-3-031-70431-4_58","title":"An Investigation on the Benefits, Challenges and Solutions for BIM Adoption in the Indian Construction Industry","year":2024,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"EllisDon (Canada)","funders":"","keywords":"Construction engineering; Business; Engineering; Risk analysis (engineering)","score_opus":0.02850634703813267,"score_gpt":0.20482740834356078,"score_spread":0.1763210613054281,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405857815","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9146405,0.0007420349,0.0014503918,0.0050866394,0.000046964335,0.000081818485,0.000087166285,0.000038596674,0.0778258],"genre_scores_gemma":[0.99574214,0.00050138263,0.0008133045,0.0001525607,0.0000072528833,0.000014797984,0.000037081412,0.0000055919672,0.0027258985],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99456364,0.001451952,0.00019960961,0.00028013237,0.0024159597,0.0010887382],"domain_scores_gemma":[0.99394554,0.002504269,0.0008530753,0.0002354811,0.0019113786,0.0005502859],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004525782,0.0002671874,0.00017234775,0.0020297107,0.0026388338,0.0063173305,0.0012559574,0.0010549191,0.004646501],"category_scores_gemma":[0.009449162,0.00029539614,0.00044207304,0.0058217063,0.0024754521,0.0040859734,0.0028923976,0.0019308885,0.00055158156],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047567647,0.00083772524,0.3641923,0.00094572717,0.00005711011,0.0029090706,0.11045266,0.0025343304,0.008553348,0.12951939,0.008057024,0.37146568],"study_design_scores_gemma":[0.0000133348385,0.00040342452,0.5244625,0.00053306,0.00013047775,0.0010891703,0.39964017,0.005333788,0.002876119,0.010390791,0.055036772,0.00009038103],"about_ca_topic_score_codex":0.031311136,"about_ca_topic_score_gemma":0.06058386,"teacher_disagreement_score":0.031311136,"about_ca_system_score_codex":0.006670938,"about_ca_system_score_gemma":0.008676798,"threshold_uncertainty_score":0.062257767},"labels":[],"label_agreement":null},{"id":"W4405920332","doi":"10.1504/ijplm.2024.143541","title":"Comparing IT tools used by a sample of BIM- and PLM-supported industries for design/engineering change management","year":2024,"lang":"en","type":"article","venue":"International Journal of Product Lifecycle Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Sample (material); Engineering; Manufacturing engineering; Operations management; Engineering management; Systems engineering; Chemistry","score_opus":0.06541142170030666,"score_gpt":0.2648728478926646,"score_spread":0.1994614261923579,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405920332","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95358855,0.0006824693,0.031090397,0.00018772496,0.000017143659,0.00033051745,0.00033203437,0.00030619188,0.013464973],"genre_scores_gemma":[0.9505047,0.00057184295,0.0458111,0.00007328746,0.0000075577404,0.00035264622,0.000777855,0.00011924625,0.0017817585],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9918326,0.0031161748,0.00083636364,0.0006623712,0.0028985108,0.0006538737],"domain_scores_gemma":[0.98154837,0.010934439,0.0015373961,0.002511588,0.0028326393,0.0006354866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006646843,0.00053957506,0.00040080148,0.008269193,0.0008918155,0.003382513,0.00092950533,0.0008791626,0.0015593405],"category_scores_gemma":[0.022763276,0.00033089417,0.0005673995,0.006960736,0.0010769265,0.00271722,0.0027619412,0.0006242436,0.00057612476],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009219998,0.0011219492,0.16882144,0.0017318918,0.00017777648,0.0023459303,0.071024865,0.0071845152,0.028460877,0.0133958,0.0015580999,0.7032549],"study_design_scores_gemma":[0.00023134802,0.0041302135,0.45259893,0.0027893116,0.0005734028,0.009436561,0.19184063,0.039757423,0.0827283,0.015473718,0.20001647,0.00042371824],"about_ca_topic_score_codex":0.0013284929,"about_ca_topic_score_gemma":0.0018740151,"teacher_disagreement_score":0.008269193,"about_ca_system_score_codex":0.001303261,"about_ca_system_score_gemma":0.0015933841,"threshold_uncertainty_score":0.035152256},"labels":[],"label_agreement":null},{"id":"W4405931610","doi":"10.1007/978-3-031-61507-8","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2023, Volume 6","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Political science; Civil society; Engineering ethics; Environmental ethics; Regional science; Engineering; Sociology; Law; Physics; Philosophy; Thermodynamics","score_opus":0.004742387975787928,"score_gpt":0.1758014728463465,"score_spread":0.17105908487055857,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405931610","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030317712,0.018130157,0.0033462949,0.027584223,0.06670257,0.0002036829,0.0058240932,0.0007628969,0.8744143],"genre_scores_gemma":[0.0031588895,0.0045614135,0.00081529457,0.00065173605,0.0008814057,0.000026118052,0.0018633334,0.00017340736,0.9878684],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99853504,0.00007470832,0.000024716555,0.00007625145,0.0010861536,0.00020307826],"domain_scores_gemma":[0.99780864,0.00006736396,0.00002157225,0.00005022677,0.0015836292,0.0004685605],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015387726,0.0012042444,0.000882286,0.0018427673,0.0026109596,0.0053624925,0.001310247,0.0020004914,0.3183175],"category_scores_gemma":[0.0015456878,0.00043200012,0.0005412839,0.0023940043,0.0009297432,0.0014203299,0.001755876,0.0019762388,0.11941898],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017354268,0.000020097734,0.00010056623,0.00004516168,0.0000022755946,0.000015694806,0.00002068104,0.00008289576,0.00021262985,0.0011306922,0.97176164,0.026590303],"study_design_scores_gemma":[0.0000035263688,0.000005478806,0.00062963716,0.00004075635,0.0000033495166,0.000013663531,0.00008346063,0.00013082629,0.0001351591,0.00045861257,0.9984894,0.000006097495],"about_ca_topic_score_codex":0.40136918,"about_ca_topic_score_gemma":0.70189655,"teacher_disagreement_score":0.99271333,"about_ca_system_score_codex":0.007286659,"about_ca_system_score_gemma":0.02440368,"threshold_uncertainty_score":0.97233737},"labels":[],"label_agreement":null},{"id":"W4405931794","doi":"10.1007/978-3-031-61507-8_14","title":"Comparative Experimental Study of Three Concrete Workability Tests","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Memorial University of Newfoundland","funders":"","keywords":"Materials science; Structural engineering; Engineering","score_opus":0.0161349193569992,"score_gpt":0.23884564556712826,"score_spread":0.22271072621012905,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405931794","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.981991,0.00028493107,0.0127827795,0.000039374463,0.00010315839,0.00021441698,0.0004104964,0.00015152429,0.004022418],"genre_scores_gemma":[0.9920367,0.00013334486,0.0031093834,0.000027300342,0.000019917832,0.00015562841,0.0004615715,0.000055647248,0.0040005315],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99828255,0.00034142865,0.0001750567,0.0003241432,0.0005709016,0.00030595777],"domain_scores_gemma":[0.99278426,0.003499132,0.00037642595,0.0011134349,0.0018148756,0.0004118281],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013902553,0.0010764381,0.0006854946,0.0013205361,0.0008592444,0.00047115082,0.0015336688,0.0014128966,0.008525713],"category_scores_gemma":[0.004758911,0.00046282497,0.00071285246,0.0007992043,0.0010338037,0.0010351214,0.0010060669,0.0008471532,0.0011730208],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.008020655,0.006490727,0.0025388761,0.00030444484,0.00007274067,0.00022359514,0.0010042053,0.004114861,0.95365405,0.0011055405,0.00036091884,0.022109305],"study_design_scores_gemma":[0.00040145728,0.039337173,0.016602691,0.000040305313,0.00023454512,0.0002817165,0.0008553537,0.00832157,0.93070966,0.001072864,0.0020375038,0.00010515347],"about_ca_topic_score_codex":0.0020042134,"about_ca_topic_score_gemma":0.0018396116,"teacher_disagreement_score":0.008525713,"about_ca_system_score_codex":0.0003457265,"about_ca_system_score_gemma":0.0005174611,"threshold_uncertainty_score":0.0285213},"labels":[],"label_agreement":null},{"id":"W4405948438","doi":"10.3390/buildings15010103","title":"Integrating Design for Manufacturing and Assembly Principles in Modular Home Construction: A Comprehensive Framework for Enhanced Efficiency and Sustainability","year":2024,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Modular design; Sustainability; Modular construction; Manufacturing engineering; Engineering; Systems engineering; Sustainable design; Architectural engineering; Computer science; Construction engineering","score_opus":0.01491373195635825,"score_gpt":0.25457524049521,"score_spread":0.23966150853885176,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4405948438","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018439876,0.013054106,0.8611305,0.006639001,0.000203494,0.0006843941,0.00013494819,0.00029332633,0.09942028],"genre_scores_gemma":[0.2215007,0.008239158,0.76350707,0.0005762667,0.00006243769,0.0008515277,0.00013525657,0.00008885617,0.0050386917],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9919573,0.004984186,0.00048228362,0.00044349043,0.0017522096,0.0003805976],"domain_scores_gemma":[0.99631387,0.0019769508,0.00045179744,0.0004048322,0.0006855774,0.00016704504],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011193046,0.0013934241,0.000615799,0.006521662,0.002191958,0.006514739,0.0020813835,0.0021213,0.0021810057],"category_scores_gemma":[0.0051675667,0.000658592,0.0010881786,0.003742022,0.010767696,0.005390797,0.005199377,0.00215424,0.0005224942],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011198434,0.00007037164,0.0011464037,0.0011233407,0.000030248173,0.00020567248,0.006343156,0.011078814,0.0012378963,0.8848092,0.001707743,0.092235915],"study_design_scores_gemma":[0.000022933476,0.00020493768,0.0037573471,0.0052509825,0.00010525231,0.0006698077,0.011572228,0.016222375,0.0032018265,0.58340335,0.37548345,0.00010548101],"about_ca_topic_score_codex":0.004666994,"about_ca_topic_score_gemma":0.008777196,"teacher_disagreement_score":0.011193046,"about_ca_system_score_codex":0.006174259,"about_ca_system_score_gemma":0.010445949,"threshold_uncertainty_score":0.05919522},"labels":[],"label_agreement":null},{"id":"W4406098930","doi":"10.2139/ssrn.5071178","title":"Assessment of Technology Pathways for Net-Zero Concrete Production","year":2025,"lang":"en","type":"article","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Calgary","funders":"","keywords":"Zero (linguistics); Net (polyhedron); Production (economics); Mathematics; Economics; Philosophy","score_opus":0.00457120915369818,"score_gpt":0.22637545784046445,"score_spread":0.22180424868676626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406098930","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9726465,0.00012167648,0.008574133,0.00009159396,0.000007930105,0.00022009159,0.0005387454,0.000044576114,0.017754853],"genre_scores_gemma":[0.9940538,0.000119381795,0.00366818,0.00000419538,5.500202e-7,0.000043843116,0.00028456614,0.000009756782,0.0018157344],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.999244,0.00024595897,0.000028245076,0.00008578473,0.00028224196,0.000113856324],"domain_scores_gemma":[0.9977102,0.00095112814,0.00021493745,0.00012111893,0.00073897326,0.0002636356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018228387,0.0005587557,0.00025038817,0.0015282794,0.00067557115,0.0032455747,0.0005990963,0.0008567889,0.0061234394],"category_scores_gemma":[0.00398486,0.00025669174,0.0005871861,0.0012229163,0.00064990105,0.0021517016,0.0011514456,0.0007201301,0.0007828112],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0045855884,0.0011762169,0.1067374,0.00063948764,0.00020921182,0.0008417161,0.0007092896,0.6954233,0.028480295,0.06836695,0.00078668754,0.09204391],"study_design_scores_gemma":[0.0004169489,0.0093674585,0.15055104,0.00032534954,0.0003874346,0.00041097574,0.009866922,0.6629009,0.067161664,0.08527767,0.013169278,0.00016432726],"about_ca_topic_score_codex":0.008930042,"about_ca_topic_score_gemma":0.013785534,"teacher_disagreement_score":0.008930042,"about_ca_system_score_codex":0.0026659793,"about_ca_system_score_gemma":0.0040195812,"threshold_uncertainty_score":0.020484984},"labels":[],"label_agreement":null},{"id":"W4406211720","doi":"10.1016/j.pes.2025.100050","title":"The durability of innovative blocks through cyclic testing and actual climate exposure","year":2025,"lang":"en","type":"article","venue":"Progress in Engineering Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"York University","funders":"","keywords":"Durability; Environmental science; Materials science; Composite material","score_opus":0.008867596608893023,"score_gpt":0.24649967706557951,"score_spread":0.2376320804566865,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406211720","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9958165,0.00016554898,0.0021235778,0.000019334111,0.000029325427,0.000015551375,0.0002161403,0.00006023847,0.0015538122],"genre_scores_gemma":[0.9980088,0.000059385773,0.0008237023,0.000010558431,0.0000043999066,0.000010303602,0.000112687834,0.000028324816,0.0009418214],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9991254,0.00007542699,0.000047217214,0.00014853482,0.00045181118,0.00015172233],"domain_scores_gemma":[0.9983712,0.00036684854,0.00019534763,0.0003880852,0.00057615625,0.00010247365],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001004839,0.00037274693,0.0002558371,0.0007033759,0.00043154223,0.000659192,0.00075058214,0.0006516392,0.0036562993],"category_scores_gemma":[0.0023220354,0.00026326318,0.00033557575,0.00054969,0.0007721985,0.00090624794,0.0006006632,0.000566249,0.0003713842],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007389388,0.00028046177,0.009981374,0.00013979232,0.00004555334,0.00023865124,0.0009716872,0.011709306,0.95211077,0.000949447,0.00045793364,0.022376213],"study_design_scores_gemma":[0.000024793146,0.002380898,0.043590892,0.000030740226,0.000099823425,0.0003593261,0.000659768,0.018989408,0.9294901,0.0005343308,0.003776484,0.00006338232],"about_ca_topic_score_codex":0.001436408,"about_ca_topic_score_gemma":0.0031285314,"teacher_disagreement_score":0.0036562993,"about_ca_system_score_codex":0.00047148662,"about_ca_system_score_gemma":0.0003250086,"threshold_uncertainty_score":0.012231529},"labels":[],"label_agreement":null},{"id":"W4406321664","doi":"10.1109/twc.2024.3525410","title":"Diffusion-Based Deep Reinforcement Learning for Resource Management in Connected Construction Equipment Networks: A Hierarchical Framework","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Wireless Communications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Beijing Jiaotong University","keywords":"Reinforcement learning; Computer science; Diffusion; Resource management (computing); Artificial intelligence; Computer network; Distributed computing","score_opus":0.010948539652178459,"score_gpt":0.2441993846879054,"score_spread":0.23325084503572693,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406321664","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03333922,0.0005259667,0.96281064,0.0004301602,0.000048693564,0.000033775395,0.00004130615,0.00031699214,0.0024532813],"genre_scores_gemma":[0.93892056,0.0002743837,0.05704563,0.00021147236,0.000046353547,0.00010854917,0.00010476792,0.000054977525,0.0032334079],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9995732,0.00012011669,0.000020829182,0.0000986252,0.00009048596,0.000096743715],"domain_scores_gemma":[0.99882585,0.0007414248,0.00012238754,0.00003430138,0.00019663402,0.00007944953],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012936698,0.0008467226,0.0011316437,0.0004935236,0.00034855507,0.0008419481,0.0015073001,0.0010908241,0.0016114279],"category_scores_gemma":[0.0027606112,0.0005090308,0.00052558107,0.00043949045,0.0009709631,0.00085372746,0.0010547151,0.0015735975,0.00020391478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024969439,0.000019642823,0.00049909553,0.000026866817,0.000019756144,0.000030207952,0.000027539196,0.9843806,0.00043890823,0.004073792,0.00028966644,0.010168918],"study_design_scores_gemma":[0.0000016537936,0.000003902227,0.000021510648,0.00000118948,0.0000015745221,0.0000012167058,0.0000013709594,0.9993481,0.00003311858,0.0005531905,0.00003223977,9.621336e-7],"about_ca_topic_score_codex":0.015392879,"about_ca_topic_score_gemma":0.012640282,"teacher_disagreement_score":0.015392879,"about_ca_system_score_codex":0.0016209965,"about_ca_system_score_gemma":0.001672235,"threshold_uncertainty_score":0.030606568},"labels":[],"label_agreement":null},{"id":"W4406469549","doi":"10.3390/su17020673","title":"Developing an openBIM Information Delivery Specifications Framework for Operational Carbon Impact Assessment of Building Projects","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"National Research Council Canada","keywords":"Integrated project delivery; Business; Engineering; Computer science; Environmental resource management; Construction engineering; Systems engineering; Process management; Environmental science; Project management","score_opus":0.022169596546689777,"score_gpt":0.3352652333777578,"score_spread":0.31309563683106806,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406469549","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0022052007,0.00015705214,0.9816403,0.0006214122,0.000086963686,0.0005209457,0.00197824,0.0039082896,0.008881647],"genre_scores_gemma":[0.03159983,0.00045089016,0.9495179,0.0004005935,0.000053896463,0.0011566214,0.012106131,0.0011726528,0.003541446],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9832201,0.004652839,0.002984472,0.0012410574,0.0070185955,0.0008829035],"domain_scores_gemma":[0.9863776,0.002928023,0.0013706841,0.003488937,0.005324198,0.0005105966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022784326,0.0017098028,0.00093356107,0.009007561,0.0019605537,0.010129853,0.00518295,0.0026903,0.004362204],"category_scores_gemma":[0.025466431,0.001536193,0.00278574,0.0055214125,0.001839488,0.008251142,0.0077987015,0.0040253103,0.0032896071],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000066551176,0.00029730704,0.003919129,0.00061986415,0.00011492817,0.0005267286,0.0017997819,0.062324055,0.004435677,0.7569324,0.025694916,0.14326862],"study_design_scores_gemma":[0.00004883682,0.00009872971,0.0012054755,0.0010358213,0.00008588606,0.0006134854,0.001268771,0.22041629,0.01249293,0.18034093,0.5822038,0.00018901684],"about_ca_topic_score_codex":0.021071967,"about_ca_topic_score_gemma":0.030227002,"teacher_disagreement_score":0.022784326,"about_ca_system_score_codex":0.004965165,"about_ca_system_score_gemma":0.012532586,"threshold_uncertainty_score":0.12049645},"labels":[],"label_agreement":null},{"id":"W4406500059","doi":"10.1109/dasa63652.2024.10836395","title":"Leveraging BIM for Decision Support and Logistics Optimization in Bahrain's Engineering Application","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Computer science; Decision support system; Systems engineering; Engineering; Artificial intelligence","score_opus":0.00912783951052959,"score_gpt":0.22092693942635666,"score_spread":0.21179909991582707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406500059","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.26575267,0.0038287637,0.62727594,0.0049386118,0.00021237473,0.00038518416,0.0009939305,0.0032613883,0.093351096],"genre_scores_gemma":[0.8103747,0.0016983959,0.18371603,0.00013198436,0.000029037832,0.00009218546,0.00037804127,0.00007969272,0.0035000101],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9994388,0.00022308051,0.000042135904,0.000063730986,0.000134248,0.00009792351],"domain_scores_gemma":[0.9997538,0.00010751968,0.0000248468,0.00002715797,0.00006358179,0.000023193228],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011322184,0.0007049399,0.00053027447,0.0015218781,0.000996714,0.0027959025,0.0008195891,0.00086981774,0.0022305525],"category_scores_gemma":[0.0012916131,0.00033004698,0.0005650942,0.0020519334,0.00050966657,0.0014824322,0.0023368997,0.00058612507,0.0003963966],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002683311,0.00039368385,0.01129971,0.0007935639,0.00013430591,0.0020813146,0.0017135014,0.5207589,0.017600145,0.054499347,0.007849891,0.38260728],"study_design_scores_gemma":[0.00003289329,0.00011316115,0.005258825,0.00021083682,0.00009758944,0.00033307716,0.0017892336,0.9271847,0.0074691065,0.017115226,0.040337227,0.000058087775],"about_ca_topic_score_codex":0.019247036,"about_ca_topic_score_gemma":0.028282141,"teacher_disagreement_score":0.019247036,"about_ca_system_score_codex":0.0013578985,"about_ca_system_score_gemma":0.0019829406,"threshold_uncertainty_score":0.038269997},"labels":[],"label_agreement":null},{"id":"W4406568135","doi":"10.1016/b978-0-443-22282-5.00009-7","title":"Application of integrated MCDM methods in civil engineering","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Multiple-criteria decision analysis; Construction engineering; Civil engineering; Computer science; Systems engineering; Engineering; Operations research","score_opus":0.007810211435802939,"score_gpt":0.24043312317122176,"score_spread":0.23262291173541882,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406568135","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002061255,0.004456546,0.9592893,0.00029459244,0.00028425182,0.00006444675,0.00014499194,0.00021043696,0.033194132],"genre_scores_gemma":[0.044932898,0.0044097006,0.9351127,0.000083254905,0.0000753692,0.00015256742,0.00023671697,0.00013360791,0.014863131],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9986333,0.00054373604,0.00006379998,0.000110892215,0.000613688,0.000034574627],"domain_scores_gemma":[0.998638,0.0009597488,0.000037053203,0.00011421324,0.00023016764,0.00002096149],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015640395,0.00077646866,0.000988636,0.0020604734,0.0004865795,0.0021212576,0.0011852945,0.00081916247,0.014132422],"category_scores_gemma":[0.003482802,0.0007583282,0.0010280708,0.0036320123,0.0006022249,0.0010104409,0.0015911115,0.0012943791,0.0016760606],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026119342,0.0001176424,0.000717129,0.0009520464,0.00016687634,0.00011880912,0.0002581321,0.12462325,0.0021633776,0.16091543,0.01330566,0.6966355],"study_design_scores_gemma":[0.00002357199,0.0000676616,0.0016681794,0.00086473144,0.00009321223,0.00029623718,0.00029045602,0.59899604,0.003064289,0.24695835,0.14762531,0.0000520116],"about_ca_topic_score_codex":0.0035199765,"about_ca_topic_score_gemma":0.009177909,"teacher_disagreement_score":0.014132422,"about_ca_system_score_codex":0.0007915368,"about_ca_system_score_gemma":0.000920728,"threshold_uncertainty_score":0.04727763},"labels":[],"label_agreement":null},{"id":"W4406611423","doi":"10.1109/wsc63780.2024.10838906","title":"A Federated Simulation-Based Framework for Enhanced Construction Project Planning and Control","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Control (management); Systems engineering; Engineering; Artificial intelligence","score_opus":0.01298878791146181,"score_gpt":0.2749704926771835,"score_spread":0.2619817047657217,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406611423","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005017255,0.00010627365,0.9882112,0.0001719473,0.000037983926,0.00007965877,0.00009759084,0.0022636703,0.0040144515],"genre_scores_gemma":[0.27128142,0.0003837214,0.723404,0.000094848365,0.000028142777,0.00029829997,0.0007395588,0.00024840957,0.0035215614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990872,0.0003388669,0.00007922226,0.00015330594,0.00024566887,0.000095674186],"domain_scores_gemma":[0.9994373,0.00013493643,0.000052937343,0.00015626305,0.00012084957,0.0000977927],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002116235,0.00057815923,0.0007295746,0.0013441459,0.00096679066,0.002260811,0.00220737,0.0011044308,0.0029222937],"category_scores_gemma":[0.0016655339,0.00040191988,0.0012243924,0.0009011458,0.0010576401,0.001884225,0.0028394377,0.0009676459,0.000498135],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010778082,0.00011951226,0.0012169214,0.00010093219,0.0000731731,0.0003259483,0.00032844584,0.7348782,0.004086933,0.20654562,0.0026184325,0.04959817],"study_design_scores_gemma":[0.000019748744,0.000023029817,0.00015455864,0.00003801838,0.00001891105,0.000066713576,0.000042130454,0.951259,0.0013239557,0.028839314,0.018190635,0.000023977067],"about_ca_topic_score_codex":0.012774603,"about_ca_topic_score_gemma":0.0117634935,"teacher_disagreement_score":0.012774603,"about_ca_system_score_codex":0.0017119348,"about_ca_system_score_gemma":0.0042117126,"threshold_uncertainty_score":0.02540052},"labels":[],"label_agreement":null},{"id":"W4406612807","doi":"10.1109/wsc63780.2024.10838902","title":"How Do Different Minds Shape Performance in Construction? An Agent-Based Modelling Approach","year":2024,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Artificial intelligence","score_opus":0.017879376204477056,"score_gpt":0.1976169306819519,"score_spread":0.17973755447747486,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406612807","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6167283,0.0011916402,0.30573756,0.0039880075,0.00009278454,0.00024777467,0.0006785191,0.00017631761,0.07115904],"genre_scores_gemma":[0.9700693,0.0004206681,0.024437748,0.00011273385,0.000021670283,0.00025419603,0.00009411418,0.000029753506,0.0045598405],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996138,0.00021142072,0.000013215887,0.00006311505,0.00004794383,0.000050556937],"domain_scores_gemma":[0.99839944,0.0010679468,0.00021660834,0.00006397144,0.00010957096,0.00014241807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008775732,0.00066306704,0.0005524913,0.0008257453,0.00059487496,0.0034533446,0.0010778958,0.0012666018,0.0037030496],"category_scores_gemma":[0.003957927,0.00047328172,0.00092899316,0.0007569246,0.0011153963,0.001598079,0.0013306894,0.0008723093,0.00042036176],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023798393,0.0003558649,0.026115019,0.00017927586,0.00025329247,0.0003328159,0.003950305,0.7865202,0.0029601047,0.1596904,0.0011172633,0.01828751],"study_design_scores_gemma":[0.000072252406,0.00012195542,0.010252816,0.0000457434,0.00007535687,0.00008524105,0.00079155597,0.90951514,0.00023864122,0.0751611,0.0035852196,0.000054943466],"about_ca_topic_score_codex":0.009843511,"about_ca_topic_score_gemma":0.0069565084,"teacher_disagreement_score":0.009843511,"about_ca_system_score_codex":0.0015169032,"about_ca_system_score_gemma":0.0009919788,"threshold_uncertainty_score":0.019572377},"labels":[],"label_agreement":null},{"id":"W4406697304","doi":"10.33593/iccp.v11i1.339","title":"Long Term Evaluation of Unbonded Concrete Overlay Technology: A Municipal Case Study","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Concrete Pavements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"University of Waterloo","keywords":"Overlay; Term (time); Environmental science; Civil engineering; Forensic engineering; Computer science; Engineering; Geotechnical engineering; Physics","score_opus":0.039036285185506996,"score_gpt":0.30953787517993003,"score_spread":0.27050158999442303,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406697304","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9939122,0.000104090876,0.0007706054,0.00005819995,0.000004878476,0.00015004246,0.0001307077,0.000020296186,0.004849031],"genre_scores_gemma":[0.9936779,0.00018278272,0.0019240307,0.000011246444,0.0000042425404,0.00007338332,0.00015768867,0.00001703819,0.003951708],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9970011,0.0010219185,0.00014633582,0.00022497607,0.0011201552,0.00048548976],"domain_scores_gemma":[0.9950949,0.0010134238,0.00047181788,0.0005387373,0.0022272936,0.0006539525],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032128247,0.0005286479,0.0005068654,0.0011975819,0.002779792,0.002049882,0.0013346698,0.0013987342,0.00237981],"category_scores_gemma":[0.0071623647,0.0003119754,0.0003037242,0.002145636,0.00152361,0.0010589684,0.001454407,0.0007900444,0.0007584406],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0034881993,0.015369539,0.2765584,0.0023680867,0.00026859553,0.043536212,0.14540727,0.08934546,0.071069166,0.011184775,0.007507721,0.33389664],"study_design_scores_gemma":[0.00024373678,0.029115468,0.46625498,0.00070413604,0.0004402204,0.0069698007,0.2838326,0.03940241,0.051921617,0.0027167762,0.1180406,0.00035767263],"about_ca_topic_score_codex":0.055385534,"about_ca_topic_score_gemma":0.20483145,"teacher_disagreement_score":0.055385534,"about_ca_system_score_codex":0.007286028,"about_ca_system_score_gemma":0.0032656766,"threshold_uncertainty_score":0.11012632},"labels":[],"label_agreement":null},{"id":"W4406705249","doi":"10.33593/iccp.v7i1.231","title":"USING FIBER-REINFORCED POLYMER LOAD TRANSFER","year":2001,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Concrete Pavements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"North Carolina State University","keywords":"Transfer (computing); Fiber; Materials science; Composite material; Computer science; Parallel computing","score_opus":0.03810906958843497,"score_gpt":0.25417941647280645,"score_spread":0.2160703468843715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4406705249","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9534817,0.0011253057,0.03833795,0.000055440476,0.000052563126,0.00019967074,0.00009217641,0.0003201533,0.006335193],"genre_scores_gemma":[0.965208,0.00084294373,0.027618892,0.00003205233,0.000015006558,0.000048906375,0.000115769275,0.00002145613,0.006097056],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9995414,0.000046789686,0.00002229674,0.00008360954,0.00025356218,0.00005237918],"domain_scores_gemma":[0.9997719,0.000038039158,0.00008780615,0.00003366472,0.000048104805,0.000020473593],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00031848377,0.00061454397,0.00022894242,0.00050698157,0.00023856788,0.0005067637,0.0005153914,0.00047342858,0.0017106468],"category_scores_gemma":[0.0003548747,0.00019324689,0.0003193494,0.0004211927,0.00023388948,0.0009856574,0.0004728765,0.0002464722,0.0008544319],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011229609,0.0002239705,0.0011629974,0.00020494245,0.000016415415,0.0001266624,0.00004887566,0.0026691377,0.9430902,0.00033688976,0.00010265194,0.051904958],"study_design_scores_gemma":[0.0000190085,0.0016669856,0.0037692867,0.000013541611,0.000024203187,0.00034380515,0.00003030998,0.0033403984,0.98451173,0.000098681645,0.006159585,0.000022523305],"about_ca_topic_score_codex":0.0007278229,"about_ca_topic_score_gemma":0.0016759736,"teacher_disagreement_score":0.0017106468,"about_ca_system_score_codex":0.00032075573,"about_ca_system_score_gemma":0.00022735314,"threshold_uncertainty_score":0.0057227015},"labels":[],"label_agreement":null},{"id":"W4407040798","doi":"10.1108/ci-03-2024-0092","title":"Organizational competencies for BIM adoption: a cross-field analysis in the built asset industry","year":2025,"lang":"en","type":"article","venue":"Construction Innovation","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Business; Field (mathematics); Asset (computer security); Knowledge management; Industrial organization; Process management; Computer science; Mathematics","score_opus":0.014797644120468963,"score_gpt":0.2689009429311613,"score_spread":0.2541032988106923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407040798","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99927026,0.000026852675,0.00023020424,0.000018483157,9.91227e-7,0.00001924321,0.000024379486,0.00000124288,0.00040834927],"genre_scores_gemma":[0.99965453,0.000017662707,0.00019599944,0.0000053575473,0.0000010245137,0.000012987113,0.00003790206,7.5696795e-7,0.0000736985],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9968894,0.0013999703,0.00027804865,0.00032559058,0.000720272,0.0003867081],"domain_scores_gemma":[0.98103654,0.010327866,0.0038355335,0.0010291596,0.0022559252,0.0015149307],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0065114778,0.00016785797,0.00024841502,0.003970655,0.00072521815,0.0012809517,0.0004037576,0.0003481149,0.001808622],"category_scores_gemma":[0.015254438,0.00019279358,0.00040549145,0.0019989316,0.0009602037,0.0015866093,0.001988428,0.0003933393,0.00020352146],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089380366,0.00023041817,0.97901595,0.00004730519,0.00004188554,0.00007733514,0.006760158,0.0002633871,0.00041923768,0.00034703844,0.00008794423,0.012619916],"study_design_scores_gemma":[0.0000032623961,0.00016171717,0.9832902,0.000030120324,0.0000103240845,0.00007236172,0.014802504,0.00085581676,0.00021101734,0.00015954969,0.00039600162,0.000007086598],"about_ca_topic_score_codex":0.00393692,"about_ca_topic_score_gemma":0.004877329,"teacher_disagreement_score":0.0065114778,"about_ca_system_score_codex":0.0011866643,"about_ca_system_score_gemma":0.0015085973,"threshold_uncertainty_score":0.034436405},"labels":[],"label_agreement":null},{"id":"W4407080367","doi":"10.1007/s41062-025-01888-0","title":"Construction schedule planning to incorporate social distancing regulations during pandemics – a BIM-based approach","year":2025,"lang":"en","type":"article","venue":"Innovative Infrastructure Solutions","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Social distance; Pandemic; Schedule; Coronavirus disease 2019 (COVID-19); Environmental planning; Computer security; Environmental engineering science; Distancing; Computer science; Engineering; Internet privacy; Risk analysis (engineering); Business; Biogeosciences; Geography; Medicine; Infectious disease (medical specialty); Geology; Disease","score_opus":0.012036520127010205,"score_gpt":0.24025507851523523,"score_spread":0.22821855838822502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407080367","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.028346034,0.00016138131,0.9383962,0.00077786605,0.000114138275,0.00057026866,0.0007282965,0.00092734705,0.029978527],"genre_scores_gemma":[0.4360093,0.00029190435,0.555487,0.00009837244,0.000030531668,0.00044446366,0.0013046233,0.00025974077,0.0060740816],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9983139,0.0006566539,0.00009724092,0.00022265545,0.00047988616,0.00022973557],"domain_scores_gemma":[0.9987663,0.00038897296,0.00017701466,0.00016914634,0.00037399243,0.00012458803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002220536,0.0012687257,0.0009615801,0.0032026826,0.0011960423,0.0029382692,0.0021531866,0.0015196335,0.007919496],"category_scores_gemma":[0.003666662,0.0012238765,0.0012770194,0.0027263747,0.0008546432,0.0025488324,0.0026874128,0.0012516512,0.0014130183],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000069882146,0.00023541252,0.0021386477,0.00018328454,0.00006397738,0.00021349297,0.00057000614,0.8633222,0.0028521668,0.031874266,0.003808231,0.09466848],"study_design_scores_gemma":[0.000016616008,0.00007090973,0.0010819054,0.000070676404,0.000034407993,0.000053771004,0.00083714403,0.97002864,0.0014878281,0.0144919865,0.0117906695,0.000035396235],"about_ca_topic_score_codex":0.018510323,"about_ca_topic_score_gemma":0.032302827,"teacher_disagreement_score":0.018510323,"about_ca_system_score_codex":0.0017093584,"about_ca_system_score_gemma":0.0050406675,"threshold_uncertainty_score":0.036805153},"labels":[],"label_agreement":null},{"id":"W4407094064","doi":"10.2139/ssrn.5123363","title":"Strutgen - Coordinate-Driven Implicit Modeling of Strut and Plate-Type Lattice Structures","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Lattice (music); Type (biology); Geometry; Computer science; Physics; Mathematics; Geology; Acoustics","score_opus":0.008411269739100849,"score_gpt":0.23345175671158847,"score_spread":0.22504048697248763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407094064","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.061055854,0.00017278155,0.923078,0.00010718137,0.00005565393,0.000041494277,0.00027469537,0.00054283394,0.014671635],"genre_scores_gemma":[0.8406338,0.0002863487,0.1460276,0.000043391785,0.000018176961,0.00012471434,0.00042080795,0.00028214513,0.01216313],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99976164,0.00005272459,0.0000092227365,0.00003060625,0.00011820086,0.000027641876],"domain_scores_gemma":[0.9997789,0.000065895685,0.000029787976,0.00004393997,0.00006068118,0.00002079409],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030599997,0.00054967223,0.000832326,0.00051832496,0.00040566293,0.0016145379,0.0015185305,0.0013434675,0.0036398014],"category_scores_gemma":[0.000863993,0.00055342074,0.0006102976,0.000775336,0.0008331791,0.0009909208,0.0011215674,0.00092449394,0.0007963796],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016279704,0.000021955027,0.00023802281,0.000023235929,0.000008730458,0.000043527252,0.00003666166,0.9705509,0.0015945435,0.021526892,0.00019730772,0.005741859],"study_design_scores_gemma":[0.000001612093,0.0000042137726,0.00002610784,0.0000022819238,0.0000010850893,0.000007648975,0.0000066966895,0.9974468,0.0003950593,0.0016885902,0.00041790397,0.0000020263803],"about_ca_topic_score_codex":0.0060497206,"about_ca_topic_score_gemma":0.0073119337,"teacher_disagreement_score":0.0060497206,"about_ca_system_score_codex":0.0006760058,"about_ca_system_score_gemma":0.0013451333,"threshold_uncertainty_score":0.012176275},"labels":[],"label_agreement":null},{"id":"W4407175182","doi":"10.1139/cjce-2024-0154","title":"Assessing BIM adoption in the Canadian construction industry: a fuzzy Bayesian network approach","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Windsor","funders":"Canadian Network for Research and Innovation in Machining Technology, Natural Sciences and Engineering Research Council of Canada","keywords":"Building information modeling; Bayesian network; Construction industry; Economic shortage; Key (lock); Fuzzy logic; Process management; Computer science; Engineering; Risk analysis (engineering); Construction engineering; Business; Operations management; Artificial intelligence; Computer security","score_opus":0.009388516436730434,"score_gpt":0.19722799293643076,"score_spread":0.18783947649970031,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407175182","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8150558,0.0012782181,0.14518498,0.0023552736,0.00003083314,0.00062452594,0.002946471,0.00016147924,0.032362398],"genre_scores_gemma":[0.9494317,0.00061724836,0.047575455,0.000061681785,0.000004943975,0.0001405073,0.00072096364,0.0000079069705,0.0014395969],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9980888,0.00054168684,0.0001053672,0.0002789402,0.00073348323,0.00025166667],"domain_scores_gemma":[0.9937023,0.0028149174,0.00061542314,0.00012478708,0.0025305485,0.00021211656],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004546168,0.0005903274,0.00046667454,0.00818451,0.0021359152,0.0028402994,0.0013228756,0.0007743613,0.0014280526],"category_scores_gemma":[0.017285436,0.00044112338,0.0006310507,0.007149213,0.0009698337,0.0013645543,0.0014506273,0.00057276926,0.00012366739],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028415455,0.00027879476,0.40861386,0.0005261346,0.00042220138,0.0005925165,0.007160895,0.3019645,0.0015427653,0.054570943,0.0039950185,0.22004831],"study_design_scores_gemma":[0.00003092048,0.00009470072,0.13752626,0.00026020693,0.00033593987,0.00013974254,0.007008142,0.82534885,0.0009714912,0.019070841,0.009059903,0.00015301925],"about_ca_topic_score_codex":0.9159507,"about_ca_topic_score_gemma":0.91914225,"teacher_disagreement_score":0.084049284,"about_ca_system_score_codex":0.026067749,"about_ca_system_score_gemma":0.023919452,"threshold_uncertainty_score":0.18913561},"labels":[],"label_agreement":null},{"id":"W4407272856","doi":"10.2139/ssrn.5122800","title":"Mp-Mcwt: Message Passing Strategy for Multi-Camera Worker Tracking in Construction","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Tracking (education); Computer science; Computer vision; Artificial intelligence; Psychology","score_opus":0.020580886519634137,"score_gpt":0.2766104539018321,"score_spread":0.25602956738219795,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407272856","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002730467,0.000036675105,0.9950959,0.000041499767,0.000033407778,0.000027218286,0.000050673127,0.0014180924,0.00056601566],"genre_scores_gemma":[0.19779819,0.00014465996,0.7913745,0.000107523694,0.00007023582,0.0002757258,0.0005230857,0.00056624407,0.009139741],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989248,0.00024318043,0.000067915236,0.00025961976,0.00035518213,0.0001492659],"domain_scores_gemma":[0.9986749,0.00043908175,0.000088787805,0.00038425068,0.00032669393,0.00008618438],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012065007,0.001230724,0.0013245562,0.0011381252,0.00094442023,0.00140834,0.0026390348,0.0018179155,0.007112944],"category_scores_gemma":[0.0034494428,0.00062489085,0.0008361449,0.001203647,0.0006872932,0.0018866074,0.002295815,0.0016326802,0.002924648],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007443663,0.000231369,0.0010163444,0.00032959046,0.00011646175,0.00024148586,0.0004468337,0.28846404,0.030872641,0.047904905,0.012250295,0.6173817],"study_design_scores_gemma":[0.000026309885,0.000056500467,0.00018358584,0.000010014345,0.000014274674,0.000051359064,0.000029880295,0.97433496,0.00983456,0.012451502,0.0029921304,0.0000148294175],"about_ca_topic_score_codex":0.008474166,"about_ca_topic_score_gemma":0.005361058,"teacher_disagreement_score":0.008474166,"about_ca_system_score_codex":0.0007903173,"about_ca_system_score_gemma":0.0015186932,"threshold_uncertainty_score":0.023795187},"labels":[],"label_agreement":null},{"id":"W4407275696","doi":"10.1007/978-981-16-7408-2_44-1","title":"Structural Analysis and Design Principles of Performance-Based Seismic Design (PBSD)","year":2024,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"Seismic analysis; Computer science; Engineering; Geology; Structural engineering","score_opus":0.02785354738688222,"score_gpt":0.1983828207230349,"score_spread":0.17052927333615267,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407275696","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0005066902,0.0010391858,0.9430533,0.0004288893,0.00016453805,0.00002859979,0.00007969739,0.00024249153,0.054456636],"genre_scores_gemma":[0.08012763,0.0054818243,0.7921331,0.0005496364,0.0002855223,0.00037538752,0.00045692042,0.00048640525,0.12010349],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9995034,0.00008856881,0.000019849524,0.000053869553,0.00030778642,0.00002648743],"domain_scores_gemma":[0.99981195,0.00007578218,0.000012445724,0.00002648919,0.000065030334,0.000008335814],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00062382873,0.0011974045,0.00058563624,0.0013018444,0.0006141148,0.0023597965,0.0012188584,0.0009115135,0.013284747],"category_scores_gemma":[0.000735351,0.0008389621,0.0006898824,0.0013444622,0.0022106522,0.0012629523,0.0012921207,0.0017549838,0.005556213],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000008971784,0.000020163849,0.00010264461,0.00014025027,0.000010209307,0.000032749387,0.00012055269,0.042798053,0.0031955717,0.81431466,0.010981108,0.1282751],"study_design_scores_gemma":[0.000006470318,0.000024297839,0.00020919445,0.00009388654,0.000011910568,0.0001515023,0.00006704697,0.102242224,0.0024669366,0.7044734,0.19023532,0.000017942195],"about_ca_topic_score_codex":0.0015122434,"about_ca_topic_score_gemma":0.0021740154,"teacher_disagreement_score":0.013284747,"about_ca_system_score_codex":0.0009454956,"about_ca_system_score_gemma":0.0010692613,"threshold_uncertainty_score":0.04444188},"labels":[],"label_agreement":null},{"id":"W4407345698","doi":"10.5430/ijfr.v16n1p35","title":"Basic Stochastic Framework for Designing and Understanding Real Estate Models","year":2025,"lang":"en","type":"article","venue":"International Journal of Financial Research","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Real estate; Econometrics; Business; Economics; Finance","score_opus":0.10266400325212006,"score_gpt":0.3765987395876126,"score_spread":0.27393473633549253,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407345698","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0039578234,0.0002813376,0.9904034,0.00043132855,0.00004408299,0.000039474948,0.00024230113,0.00009976552,0.0045004226],"genre_scores_gemma":[0.43474796,0.0035216676,0.5416697,0.00047510694,0.00048093087,0.0009906102,0.0014237069,0.00031170325,0.016378509],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99934036,0.0002675544,0.000048090875,0.00010302507,0.00018131142,0.000059587226],"domain_scores_gemma":[0.9984079,0.00095950026,0.00020381661,0.00009411931,0.00026264656,0.0000720146],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017520832,0.001165183,0.0009387289,0.0011053423,0.0005712797,0.0021330155,0.0020402991,0.001693251,0.0046470216],"category_scores_gemma":[0.0051888465,0.00069003395,0.0016589456,0.0009669736,0.0010925371,0.0017049132,0.0014706488,0.002078089,0.00082727906],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005139705,0.00002040741,0.00034244382,0.000046945705,0.000016748014,0.000087484,0.000058302372,0.6847389,0.00049492496,0.30998862,0.00075940543,0.0034407424],"study_design_scores_gemma":[0.0000046949363,0.000008320493,0.00006894541,0.00001468312,0.000004841046,0.000018594885,0.000014401704,0.9096684,0.000094474584,0.087349474,0.0027456034,0.0000074981813],"about_ca_topic_score_codex":0.011011955,"about_ca_topic_score_gemma":0.0074256733,"teacher_disagreement_score":0.011011955,"about_ca_system_score_codex":0.001307964,"about_ca_system_score_gemma":0.0019638995,"threshold_uncertainty_score":0.021895707},"labels":[],"label_agreement":null},{"id":"W44074408","doi":"10.22260/isarc2013/0065","title":"Fuzzy Clustering-Based Model for Productivity Forcasting","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Cluster analysis; Computer science; Data mining; Fuzzy logic; Weighting; Artificial intelligence; Productivity; Genetic algorithm; Fuzzy clustering; Operations research; Industrial engineering; Machine learning; Engineering","score_opus":0.01613875031713675,"score_gpt":0.20342555860758593,"score_spread":0.1872868082904492,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W44074408","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.058608174,0.0011592194,0.92004555,0.00085703743,0.00022734972,0.00018332936,0.0007830617,0.00054762297,0.017588597],"genre_scores_gemma":[0.9423149,0.0008489394,0.039334983,0.00007800926,0.000067288216,0.00026460705,0.00065733626,0.00008531831,0.016348513],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993556,0.00012221935,0.000038095473,0.00021216889,0.00016145407,0.00011041567],"domain_scores_gemma":[0.99937075,0.0002053824,0.00008750264,0.000029611061,0.00027064988,0.000036182795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011143119,0.0009248128,0.0010063761,0.0014203206,0.0008783249,0.0018703884,0.0026648385,0.0020444908,0.004266162],"category_scores_gemma":[0.0020857786,0.00044970322,0.0015888233,0.0016786205,0.0006290666,0.0013853256,0.0009868405,0.0012321396,0.0006456588],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015670019,0.000011962577,0.0004265596,0.000023144128,0.000020287915,0.000041459993,0.00003828649,0.9894565,0.0002555644,0.0043684742,0.0004506895,0.0048914887],"study_design_scores_gemma":[0.0000019476106,0.000005100495,0.00014681836,0.000003665196,0.0000057078396,0.0000065270674,0.000009570554,0.998353,0.000051958654,0.0011386845,0.0002715531,0.0000055043465],"about_ca_topic_score_codex":0.053610444,"about_ca_topic_score_gemma":0.023878202,"teacher_disagreement_score":0.053610444,"about_ca_system_score_codex":0.0030699712,"about_ca_system_score_gemma":0.0015906844,"threshold_uncertainty_score":0.10659677},"labels":[],"label_agreement":null},{"id":"W4407577003","doi":"10.2139/ssrn.5135528","title":"Experimental Study on the Feasibility of Vr-Generated Synthetic Data for Automated Productivity Monitoring in Modular Construction","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Productivity; Computer science; Operating system; Economics","score_opus":0.04177875356451113,"score_gpt":0.30995589630459786,"score_spread":0.26817714274008675,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407577003","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.92908347,0.00009211149,0.066516235,0.000074861826,0.00006439832,0.00012312064,0.0007506082,0.0006812644,0.0026140402],"genre_scores_gemma":[0.98135895,0.00003243253,0.017668132,0.000014076746,0.0000073526135,0.000045898476,0.00042806123,0.000050343504,0.0003948339],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99923563,0.0002646227,0.000033763215,0.00014561242,0.00024087465,0.000079594916],"domain_scores_gemma":[0.99725693,0.0016189876,0.00012846249,0.00041809326,0.00048471373,0.000092834955],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010363207,0.00058066455,0.00036164245,0.00064749573,0.00027874493,0.000598636,0.001004091,0.0008196884,0.0028395066],"category_scores_gemma":[0.0036344684,0.00024175891,0.0003647446,0.0008165245,0.00049966335,0.0005560104,0.0005610746,0.00048189404,0.0003748898],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0046260105,0.0028725113,0.011164134,0.000823077,0.00015400944,0.0008435243,0.0017620034,0.2542194,0.59988993,0.0035207067,0.0019962327,0.11812839],"study_design_scores_gemma":[0.0003350945,0.0032957844,0.016518053,0.00005104163,0.00011795928,0.00037175402,0.0006187191,0.69097936,0.28292328,0.0012113153,0.003493004,0.00008469018],"about_ca_topic_score_codex":0.0015927615,"about_ca_topic_score_gemma":0.0008118675,"teacher_disagreement_score":0.0028395066,"about_ca_system_score_codex":0.00025199444,"about_ca_system_score_gemma":0.0003015622,"threshold_uncertainty_score":0.009499073},"labels":[],"label_agreement":null},{"id":"W4407657879","doi":"10.3390/app15042035","title":"A Conceptual Approach for the Knowledge-Based Computational Design of Prefabricated Façade Panels Using Constructability Features","year":2025,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Constructability; Construction engineering; Architectural engineering; Computer science; Engineering; Structural engineering","score_opus":0.04761257561995846,"score_gpt":0.2726457464376044,"score_spread":0.22503317081764596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407657879","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.007249306,0.00021980837,0.96907973,0.0012943236,0.000024788744,0.00020688311,0.00009891018,0.00010397915,0.021722266],"genre_scores_gemma":[0.18037374,0.0003325737,0.815479,0.00013806023,0.000018381295,0.0008427517,0.00019746817,0.000033120145,0.0025849598],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99804354,0.00090249535,0.00014802207,0.00026413568,0.00050528336,0.00013646853],"domain_scores_gemma":[0.9977144,0.0012062589,0.00019998585,0.0004112917,0.00031287063,0.00015517286],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034576335,0.00087530504,0.00043406905,0.0034836843,0.0017217,0.00604087,0.0035261705,0.0022271166,0.0041442756],"category_scores_gemma":[0.0041956306,0.0007010391,0.0015312895,0.0024421772,0.009038362,0.006335973,0.0032481009,0.002432405,0.00043978632],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005265205,0.00002474682,0.00022077581,0.00008209958,0.0000082500765,0.00009043865,0.0019771815,0.011040149,0.00034222208,0.9779162,0.00028366756,0.008009005],"study_design_scores_gemma":[0.000029869436,0.00006445955,0.00057354727,0.0003683093,0.000034023396,0.00029563552,0.003268792,0.11484508,0.0010096463,0.8153482,0.06412516,0.000037299673],"about_ca_topic_score_codex":0.0066300617,"about_ca_topic_score_gemma":0.0075901784,"teacher_disagreement_score":0.0066300617,"about_ca_system_score_codex":0.0037502616,"about_ca_system_score_gemma":0.004367165,"threshold_uncertainty_score":0.027210176},"labels":[],"label_agreement":null},{"id":"W4407871888","doi":"10.1016/j.autcon.2025.106066","title":"A data-driven and knowledge-based decision support system for optimized construction planning and control","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Agence Nationale pour le Développement de la Recherche en Santé; Agence Nationale de la Recherche; Université de Lorraine","keywords":"Decision support system; Computer science; Control (management); Engineering; Systems engineering; Construction engineering; Data mining; Operations research; Artificial intelligence","score_opus":0.012744519453692482,"score_gpt":0.26432564603905134,"score_spread":0.25158112658535886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407871888","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010625562,0.00006145288,0.9809895,0.00013396084,0.000023663677,0.0001734677,0.0003680963,0.006168155,0.0014561338],"genre_scores_gemma":[0.33967635,0.00014784311,0.6560312,0.000113041526,0.000031277035,0.00063823105,0.00111098,0.00021264672,0.0020384348],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99867046,0.00022093547,0.00017946413,0.00035426673,0.00049912184,0.000075811615],"domain_scores_gemma":[0.9979406,0.0009348223,0.00019726968,0.00024946834,0.0005668148,0.00011102866],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025689173,0.00079646613,0.0013230748,0.0020629594,0.0008331366,0.0028747646,0.001968598,0.0010535934,0.0041728355],"category_scores_gemma":[0.005563756,0.00054435956,0.0006984923,0.0013855479,0.00043652722,0.0019357962,0.0014720135,0.0009004917,0.0010759275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009495522,0.00061184284,0.0036054777,0.00039730442,0.00023349485,0.0005769625,0.0007177683,0.39318365,0.016666198,0.018853944,0.009977088,0.55422676],"study_design_scores_gemma":[0.000067329005,0.00007726637,0.0005845639,0.000040009832,0.00005232129,0.00007472897,0.00006351086,0.9812509,0.0066448017,0.0064529846,0.004650087,0.000041489297],"about_ca_topic_score_codex":0.0040975334,"about_ca_topic_score_gemma":0.0034550582,"teacher_disagreement_score":0.0041728355,"about_ca_system_score_codex":0.0010605287,"about_ca_system_score_gemma":0.0021072768,"threshold_uncertainty_score":0.013959527},"labels":[],"label_agreement":null},{"id":"W4407956844","doi":"10.1007/978-981-16-7408-2_47-1","title":"Performance-Based Seismic Design (PBSD) Practice in China","year":2025,"lang":"en","type":"book-chapter","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Golder Associates (Canada)","funders":"","keywords":"China; Geology; Seismology; Geography; Archaeology","score_opus":0.008832645769134357,"score_gpt":0.19649601389661184,"score_spread":0.18766336812747747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407956844","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25468186,0.026454091,0.041048467,0.0060400832,0.00044359863,0.00020469459,0.0004900015,0.0006631098,0.66997415],"genre_scores_gemma":[0.6152385,0.014813437,0.021253075,0.00040131208,0.000079165744,0.00009946556,0.00043912508,0.000111017944,0.34756497],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99939966,0.00008740241,0.000047109254,0.000088365414,0.00028313222,0.00009430503],"domain_scores_gemma":[0.99987555,0.000023693381,0.000010333867,0.000028569752,0.00003739423,0.000024416922],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000897965,0.0006321137,0.0003066217,0.0012946184,0.0024624728,0.0018024053,0.0008808185,0.00048295053,0.0074069463],"category_scores_gemma":[0.00042732683,0.00033499862,0.00025849344,0.003938777,0.001886338,0.0008098608,0.0016238728,0.00048749827,0.00067870837],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004460326,0.000088485256,0.008354355,0.0005781205,0.000016275682,0.00041893116,0.010133523,0.008136833,0.0050361827,0.29931867,0.023923613,0.6439504],"study_design_scores_gemma":[0.000016152739,0.00017663375,0.036264468,0.00030861062,0.000032056047,0.00047821825,0.0039791614,0.01192038,0.0041373987,0.02788743,0.9147522,0.000047255282],"about_ca_topic_score_codex":0.0632925,"about_ca_topic_score_gemma":0.124499075,"teacher_disagreement_score":0.0632925,"about_ca_system_score_codex":0.0074745687,"about_ca_system_score_gemma":0.010929891,"threshold_uncertainty_score":0.12584817},"labels":[],"label_agreement":null},{"id":"W4407983912","doi":"10.18280/ijsse.150116","title":"Design of Worker Rotation for a Precast Concrete Pole Factory Based on Mental Workload","year":2025,"lang":"en","type":"article","venue":"International Journal of Safety and Security Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Universitas Sumatera Utara","keywords":"Precast concrete; Factory (object-oriented programming); Workload; Engineering; Rotation (mathematics); Structural engineering; Computer science","score_opus":0.0070947580036629645,"score_gpt":0.21772827488164864,"score_spread":0.21063351687798568,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407983912","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.86767274,0.00021873155,0.124051206,0.00022607915,0.00009854811,0.00095954386,0.00014339869,0.0006404242,0.005989279],"genre_scores_gemma":[0.9346514,0.00016699199,0.06082605,0.00004010159,0.000017135337,0.00091911136,0.00016855504,0.000034811237,0.003175922],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.999323,0.00021969121,0.000039086746,0.000120829536,0.00016158575,0.0001358444],"domain_scores_gemma":[0.9995028,0.00008129014,0.00007566221,0.000046138295,0.0001396491,0.00015443895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007919989,0.0006658238,0.000381605,0.0006077297,0.0006728057,0.0007423724,0.00075091876,0.00041298606,0.0028445767],"category_scores_gemma":[0.0009133018,0.00028339203,0.000474986,0.00020568476,0.00023654525,0.00038250606,0.00078784087,0.00022154434,0.0006719301],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0068881493,0.007045034,0.11847808,0.0022941246,0.00018663387,0.0019951155,0.0067882044,0.062081646,0.30018818,0.0030545841,0.0053862757,0.48561394],"study_design_scores_gemma":[0.0018118193,0.03499069,0.52276856,0.00040617786,0.0011143335,0.0016327979,0.019098356,0.2672403,0.11006385,0.002879145,0.037370674,0.0006232829],"about_ca_topic_score_codex":0.0015217983,"about_ca_topic_score_gemma":0.0019722814,"teacher_disagreement_score":0.0028445767,"about_ca_system_score_codex":0.0003692401,"about_ca_system_score_gemma":0.0012283892,"threshold_uncertainty_score":0.00951606},"labels":[],"label_agreement":null},{"id":"W4407996454","doi":"10.1061/9780784486009.046","title":"Sustainable MSE Wall Design Using Multi-Objective Optimization","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor; University of Waterloo","funders":"","keywords":"Computer science; Multi-objective optimization; Mathematical optimization; Mathematics; Machine learning","score_opus":0.013341856194207153,"score_gpt":0.2299640176969597,"score_spread":0.21662216150275254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4407996454","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05835422,0.0007116534,0.92820704,0.00017316364,0.000040615683,0.00013685458,0.00010649538,0.00022344061,0.012046569],"genre_scores_gemma":[0.7362506,0.0007681485,0.25561425,0.00009871146,0.000024226298,0.00059322687,0.00025069315,0.000086722546,0.006313395],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99967456,0.000116787094,0.000014220241,0.00004621563,0.0001023828,0.00004586744],"domain_scores_gemma":[0.99978954,0.000106682484,0.00003436553,0.000011014325,0.00004226444,0.000016173895],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00071869756,0.0010794109,0.0008862046,0.0011484496,0.00033416643,0.0010118546,0.00076255033,0.0012039073,0.002103575],"category_scores_gemma":[0.0008363621,0.0005227423,0.00094871805,0.00070220017,0.00043575952,0.00066406716,0.0010987269,0.0005296892,0.00027774958],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00000766283,0.000009376706,0.00015152241,0.000027779904,0.000012101054,0.000028214037,0.000005629252,0.99207604,0.0008504024,0.0013395343,0.00008937564,0.005402423],"study_design_scores_gemma":[0.0000050723247,0.000031854048,0.000107682055,0.000008492003,0.000007814364,0.000010294803,0.000012172309,0.99771214,0.0003534613,0.0012457398,0.0005017445,0.0000034684228],"about_ca_topic_score_codex":0.0019258838,"about_ca_topic_score_gemma":0.0024764803,"teacher_disagreement_score":0.002103575,"about_ca_system_score_codex":0.0005018079,"about_ca_system_score_gemma":0.0010200862,"threshold_uncertainty_score":0.007037163},"labels":[],"label_agreement":null},{"id":"W4408093378","doi":"10.1016/j.rineng.2025.104550","title":"Uncovering key themes in modular construction waste management and exploring their impact and centrality","year":2025,"lang":"en","type":"article","venue":"Results in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Centrality; Key (lock); Modular design; Process management; Business; Knowledge management; Data science; Engineering; Computer science; Computer security","score_opus":0.00944785027446093,"score_gpt":0.20227941720822207,"score_spread":0.19283156693376113,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408093378","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8410541,0.04287875,0.05670032,0.006019507,0.0002852712,0.0011623353,0.015141556,0.00023667843,0.036521524],"genre_scores_gemma":[0.9374279,0.015345008,0.03667304,0.00038890386,0.00011382959,0.001018897,0.005335282,0.00010230893,0.00359477],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9967229,0.0010047121,0.0005764329,0.0006356365,0.0008227151,0.00023771034],"domain_scores_gemma":[0.97368014,0.019593945,0.003016107,0.00084642356,0.0025811766,0.0002821413],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008341595,0.00064841466,0.00054345257,0.030800806,0.0011610404,0.0042866813,0.0007304125,0.00075453724,0.0028732328],"category_scores_gemma":[0.0201676,0.00028092894,0.0009445542,0.031118058,0.0016613932,0.0050021326,0.0027732514,0.0006065195,0.0003816392],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00030574348,0.00008909122,0.1909256,0.034647226,0.0005980307,0.0035917752,0.18162332,0.0030649917,0.017863197,0.058071915,0.010570426,0.49864873],"study_design_scores_gemma":[0.000042201922,0.00024484057,0.30677778,0.021841342,0.0015082178,0.0025084196,0.3158064,0.0090019135,0.0124694,0.072761655,0.25687185,0.00016599914],"about_ca_topic_score_codex":0.005716782,"about_ca_topic_score_gemma":0.009865117,"teacher_disagreement_score":0.030800806,"about_ca_system_score_codex":0.002401676,"about_ca_system_score_gemma":0.0039139627,"threshold_uncertainty_score":0.044115126},"labels":[],"label_agreement":null},{"id":"W4408106460","doi":"10.1007/978-3-031-82481-4_26","title":"Augmented Human-AI Forecasting for Ship Refit Project Scheduling: A Predict-then-Optimize Approach","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Thales (Canada)","funders":"","keywords":"Computer science; Scheduling (production processes); Artificial intelligence; Operations research; Engineering; Operations management","score_opus":0.03552596327367583,"score_gpt":0.2562589204819664,"score_spread":0.2207329572082906,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408106460","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05015559,0.0006966883,0.93813133,0.0004629087,0.00017975419,0.000061876905,0.0004501797,0.002178955,0.007682792],"genre_scores_gemma":[0.87123024,0.000266836,0.122054115,0.00013235329,0.00017279417,0.000086639295,0.00038599205,0.0001356837,0.0055353334],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996377,0.00010193021,0.000018944864,0.00010174743,0.0000716517,0.00006805503],"domain_scores_gemma":[0.9994041,0.000339325,0.000059538368,0.000058891994,0.00010145643,0.00003669532],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00080609164,0.0011913254,0.0016684391,0.0009902249,0.000641627,0.0014398174,0.0015963757,0.0012133948,0.0042550457],"category_scores_gemma":[0.0013731531,0.000869785,0.00087585027,0.0014651931,0.00054557796,0.0010850137,0.00083643774,0.0011765183,0.00072613003],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009258222,0.00007064184,0.00048101365,0.000026542179,0.000052655505,0.000031503507,0.000027007842,0.94076526,0.0005002636,0.0014566819,0.000966367,0.05552945],"study_design_scores_gemma":[0.0000028015802,0.000010074427,0.00010806257,0.0000014340847,0.000004886261,0.0000027996143,0.0000034673703,0.99885345,0.0000967353,0.00076961465,0.00014372545,0.0000028384159],"about_ca_topic_score_codex":0.031977817,"about_ca_topic_score_gemma":0.035535906,"teacher_disagreement_score":0.031977817,"about_ca_system_score_codex":0.0006882413,"about_ca_system_score_gemma":0.0014274986,"threshold_uncertainty_score":0.063583374},"labels":[],"label_agreement":null},{"id":"W4408398184","doi":"10.1007/978-3-031-84208-5_26","title":"Comparative Analysis of Two BIM Model Transfer Processes in Cave Automatic Virtual Environments","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Cave; Computer science; Human–computer interaction; Geology; Geography; Archaeology","score_opus":0.009548044969818599,"score_gpt":0.21471224436444195,"score_spread":0.20516419939462335,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398184","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8820202,0.00012822892,0.10057932,0.0000636241,0.000022280592,0.000055733813,0.00033336994,0.00055880204,0.01623852],"genre_scores_gemma":[0.98813874,0.000045252185,0.009699708,0.000005275958,0.0000014266179,0.000024042103,0.00023784372,0.000057775083,0.0017898579],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9995534,0.0001133898,0.000014277243,0.000049615097,0.00018851904,0.00008078726],"domain_scores_gemma":[0.9984994,0.0009266902,0.00007512131,0.0001436471,0.00031983646,0.00003537245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009094896,0.0003368489,0.00035742746,0.0012020074,0.00056627224,0.0014319371,0.00081445975,0.00071290514,0.0055040126],"category_scores_gemma":[0.0032930532,0.00031322084,0.00052413804,0.0016551063,0.0004943197,0.0012832334,0.0005636383,0.00036061893,0.00047836473],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.002700516,0.0006111845,0.015272979,0.00041390402,0.000099562734,0.00046056666,0.0011931929,0.7396745,0.042760823,0.02898167,0.0023024587,0.16552858],"study_design_scores_gemma":[0.00002512688,0.00020441311,0.015089606,0.000014410616,0.000049348102,0.00009433626,0.00042973316,0.96437377,0.01582059,0.0023980136,0.001468944,0.000031697928],"about_ca_topic_score_codex":0.010348946,"about_ca_topic_score_gemma":0.0073921,"teacher_disagreement_score":0.010348946,"about_ca_system_score_codex":0.00084884436,"about_ca_system_score_gemma":0.00076046115,"threshold_uncertainty_score":0.02057743},"labels":[],"label_agreement":null},{"id":"W4408398227","doi":"10.1007/978-3-031-84208-5_34","title":"Using Change Orders to Measure the Impact of Building Information Modeling: A Case Study","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Montréal; Université du Québec à Montréal","funders":"","keywords":"Measure (data warehouse); Computer science; Data mining","score_opus":0.033877567998228914,"score_gpt":0.2600188530319226,"score_spread":0.2261412850336937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398227","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98498535,0.000090643516,0.006644597,0.0001619887,0.000017801203,0.0001930281,0.00032989643,0.00015437197,0.007422317],"genre_scores_gemma":[0.988123,0.0000637727,0.010456333,0.000025607686,0.000004559748,0.000049635546,0.0002432411,0.00004109958,0.0009927474],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99570054,0.002186624,0.00019400685,0.00028357588,0.0013607151,0.00027454123],"domain_scores_gemma":[0.946846,0.04374327,0.0015851007,0.0030049905,0.00406462,0.000756003],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004005158,0.00054681225,0.00043440476,0.0022676296,0.0010440069,0.0019698471,0.0012676042,0.0013664888,0.0032294774],"category_scores_gemma":[0.024279956,0.00039593736,0.0005334739,0.0032163756,0.00094924285,0.0024682085,0.00088887865,0.0013690711,0.00056196353],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004659763,0.021452615,0.33795795,0.0011937203,0.00037882393,0.0060973894,0.016755274,0.1767883,0.028238684,0.019103019,0.0068539553,0.38052055],"study_design_scores_gemma":[0.00046892697,0.006151477,0.18873146,0.0001790719,0.00043139595,0.0020374525,0.017661035,0.7091228,0.053037263,0.008272153,0.01365652,0.0002505452],"about_ca_topic_score_codex":0.018839285,"about_ca_topic_score_gemma":0.026545152,"teacher_disagreement_score":0.018839285,"about_ca_system_score_codex":0.0024107448,"about_ca_system_score_gemma":0.0009646832,"threshold_uncertainty_score":0.037459314},"labels":[],"label_agreement":null},{"id":"W4408398295","doi":"10.1007/978-3-031-84208-5_33","title":"The IPD Contract Methodology as a Strategic Element in the Management of Building Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Element (criminal law); Business; Process management; Engineering management; Construction engineering; Engineering; Political science","score_opus":0.025043093512556798,"score_gpt":0.2557257334948404,"score_spread":0.2306826399822836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398295","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008373182,0.0028131364,0.6175503,0.006902924,0.00062482076,0.00029584853,0.00014366869,0.00013873918,0.3631573],"genre_scores_gemma":[0.36624223,0.004002855,0.5177606,0.0009480506,0.00035101414,0.0008644505,0.00026308655,0.00021589357,0.10935183],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99230665,0.0035738281,0.00032469985,0.00035967916,0.0031301097,0.00030498626],"domain_scores_gemma":[0.99737704,0.0012698364,0.00015753794,0.0004740753,0.0004932307,0.00022830139],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009633365,0.00046642683,0.0004364093,0.0023156903,0.0017167723,0.008283098,0.0023810714,0.0016067812,0.008202949],"category_scores_gemma":[0.0077110655,0.0005297561,0.00060837215,0.0036904379,0.0046516713,0.006622943,0.0049887155,0.0027981515,0.0011666429],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005787509,0.000018675415,0.00018180163,0.00007888254,0.0000043296204,0.000031136602,0.00034829613,0.0031342572,0.0001410093,0.9222508,0.003013111,0.07079196],"study_design_scores_gemma":[0.000011042136,0.00006517592,0.0006161923,0.00048313645,0.000011949238,0.00024957192,0.0012570437,0.03103317,0.0006668371,0.73600745,0.2295735,0.000024981278],"about_ca_topic_score_codex":0.0023785208,"about_ca_topic_score_gemma":0.0041494365,"teacher_disagreement_score":0.009633365,"about_ca_system_score_codex":0.004776342,"about_ca_system_score_gemma":0.0072980095,"threshold_uncertainty_score":0.050946712},"labels":[],"label_agreement":null},{"id":"W4408398303","doi":"10.1007/978-3-031-84208-5_61","title":"Planning the Evolution of the Sectors of a Construction Project Over Time with the Dynamic Location Breakdown Structure","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Business; Computer science; Geography","score_opus":0.002416383737380928,"score_gpt":0.17345099134757344,"score_spread":0.1710346076101925,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398303","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15239827,0.00038406148,0.81686467,0.00034887352,0.000034435434,0.00028150517,0.00088240515,0.00031940022,0.02848631],"genre_scores_gemma":[0.6501314,0.00047037227,0.3394441,0.000022984916,0.000006855287,0.0001863982,0.00089369953,0.00010653223,0.008737729],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99962986,0.00010667002,0.000015155092,0.000100178935,0.00008192109,0.00006629605],"domain_scores_gemma":[0.9995402,0.000225351,0.000057002388,0.000042368134,0.00007480806,0.000060369064],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069065863,0.00040003465,0.00036046733,0.0008015991,0.0005308694,0.0017477666,0.00097539974,0.0006829889,0.0057637403],"category_scores_gemma":[0.001881369,0.0007425638,0.0005900366,0.0018965364,0.0007079691,0.001993553,0.0010374606,0.00078237074,0.0008097864],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010509375,0.000070161186,0.006952691,0.00015334904,0.000028258042,0.00022113892,0.00034862477,0.8321724,0.0047334963,0.040674996,0.0017504878,0.11278928],"study_design_scores_gemma":[0.000012805276,0.00011565864,0.004453742,0.000046468955,0.000032783006,0.00013154137,0.00089088985,0.9304386,0.0028294646,0.05337058,0.0076432964,0.0000342202],"about_ca_topic_score_codex":0.01627862,"about_ca_topic_score_gemma":0.03444187,"teacher_disagreement_score":0.01627862,"about_ca_system_score_codex":0.0014096039,"about_ca_system_score_gemma":0.0023933572,"threshold_uncertainty_score":0.032367766},"labels":[],"label_agreement":null},{"id":"W4408398310","doi":"10.1007/978-3-031-84208-5_30","title":"A Case-Study Investigating the Integration of ISO 19650 and OpenBIM Principles","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Psychology","score_opus":0.020371216491315687,"score_gpt":0.22106220957997888,"score_spread":0.2006909930886632,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398310","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.941233,0.000309125,0.01198465,0.00052646804,0.000048077043,0.00033804428,0.00018356947,0.000053798973,0.04532338],"genre_scores_gemma":[0.96875125,0.00030513108,0.013807824,0.00010955237,0.000011113963,0.00012614453,0.00019702094,0.0000463217,0.016645662],"study_design_codex":"design_other","study_design_gemma":"case_report","domain_scores_codex":[0.99752766,0.0012347241,0.000076280136,0.0001581582,0.0006571904,0.00034598538],"domain_scores_gemma":[0.9966523,0.0020505972,0.00024136987,0.000368753,0.00038480505,0.00030214398],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025667301,0.00043511012,0.00039807777,0.0012404982,0.0029328929,0.0025219747,0.0018181102,0.0030090855,0.006870435],"category_scores_gemma":[0.0064906767,0.00044172513,0.0005125634,0.0026494032,0.0016816581,0.0020417755,0.0022001027,0.0017261411,0.0012822334],"study_design_candidate":"case_report","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.004145711,0.021339143,0.093918204,0.0022649583,0.00019363112,0.1282569,0.12054259,0.05167424,0.03573546,0.15795538,0.020765804,0.36320803],"study_design_scores_gemma":[0.00082396786,0.008978904,0.11854072,0.0014032302,0.00044796153,0.03798311,0.34012386,0.09687986,0.04346429,0.03097409,0.3200624,0.00031763004],"about_ca_topic_score_codex":0.009560952,"about_ca_topic_score_gemma":0.019238202,"teacher_disagreement_score":0.009560952,"about_ca_system_score_codex":0.0019336003,"about_ca_system_score_gemma":0.0012964377,"threshold_uncertainty_score":0.022983968},"labels":[],"label_agreement":null},{"id":"W4408398312","doi":"10.1007/978-3-031-84208-5_27","title":"Comprehensive Clash Prevention in BIM Coordination Using a Rule-Based System","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Computer science; Systems engineering; Engineering","score_opus":0.011081868773196488,"score_gpt":0.21141787229591003,"score_spread":0.20033600352271352,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398312","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014606197,0.00014945402,0.9734495,0.000052929714,0.00005858187,0.00018351471,0.00011130677,0.007886038,0.0035023512],"genre_scores_gemma":[0.27449277,0.00017583158,0.7191809,0.00009011759,0.00002820583,0.00017450885,0.0005313803,0.00044547036,0.0048807263],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99655294,0.00049034413,0.00045534814,0.0009959342,0.0012656162,0.00023981686],"domain_scores_gemma":[0.9960718,0.0013829645,0.0002644158,0.0012020974,0.0008968732,0.00018179289],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003337938,0.0011063019,0.0022988336,0.0022397372,0.0016079029,0.003948725,0.0042274343,0.0019111662,0.0050141322],"category_scores_gemma":[0.00601796,0.0010738345,0.0012674442,0.0017303119,0.0013135668,0.0029932403,0.0036365811,0.0016047766,0.0019360101],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007853107,0.00083166925,0.003556171,0.00029228211,0.00018770994,0.0007024769,0.000789746,0.15546168,0.030302959,0.018718695,0.006722463,0.7816489],"study_design_scores_gemma":[0.0000625361,0.0001300878,0.00070711604,0.00005843109,0.00014239566,0.00024255352,0.00012932078,0.9600798,0.023764895,0.008888083,0.005725221,0.00006955506],"about_ca_topic_score_codex":0.008523512,"about_ca_topic_score_gemma":0.008444912,"teacher_disagreement_score":0.008523512,"about_ca_system_score_codex":0.0007098429,"about_ca_system_score_gemma":0.0022773058,"threshold_uncertainty_score":0.01765287},"labels":[],"label_agreement":null},{"id":"W4408398314","doi":"10.1007/978-3-031-84208-5_21","title":"Evaluating the Interoperability of 3D Visualization Platforms in Federated Construction Simulation Settings","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Interoperability; Visualization; Computer science; Software engineering; Systems engineering; World Wide Web; Engineering; Data mining","score_opus":0.015061642982590061,"score_gpt":0.2657143780324126,"score_spread":0.25065273504982255,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9789875,0.00007339503,0.016077247,0.0001343513,0.000024342347,0.0001929643,0.00026239868,0.0006713486,0.0035764629],"genre_scores_gemma":[0.98696935,0.000039643317,0.011905826,0.000018075343,0.0000038452486,0.00008433593,0.0005698857,0.000058116842,0.00035086164],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99062425,0.0054563805,0.0006348113,0.0006980491,0.0018793893,0.00070703257],"domain_scores_gemma":[0.9601275,0.029176513,0.0015084919,0.0050410973,0.003149519,0.0009968369],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.014847264,0.0009351443,0.0006462495,0.0015486062,0.0006785396,0.004097113,0.00227679,0.0022668175,0.002972338],"category_scores_gemma":[0.05534926,0.0006311472,0.00079805515,0.0015555301,0.0013337516,0.005483943,0.0041626315,0.0014109522,0.00047554597],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.009086335,0.0047745323,0.061777905,0.0005357661,0.0007572815,0.00041748537,0.0035139483,0.74842376,0.01354833,0.015103678,0.0019904266,0.14007051],"study_design_scores_gemma":[0.0002644218,0.0028003359,0.021296179,0.00013885499,0.00023762572,0.00011074993,0.0019148735,0.9512235,0.013176732,0.0065449825,0.0022128662,0.000078894685],"about_ca_topic_score_codex":0.010786414,"about_ca_topic_score_gemma":0.005008096,"teacher_disagreement_score":0.014847264,"about_ca_system_score_codex":0.0021686575,"about_ca_system_score_gemma":0.0015404995,"threshold_uncertainty_score":0.078520775},"labels":[],"label_agreement":null},{"id":"W4408398333","doi":"10.1007/978-3-031-84208-5_16","title":"A Design Thinking Approach for BIM Acceptance Based on Use Case Identification in a Manufacturer Company","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Identification (biology); Business; Engineering; Manufacturing engineering; Systems engineering; Engineering management; Construction engineering; Process management","score_opus":0.019182851683258437,"score_gpt":0.21457655194541583,"score_spread":0.1953937002621574,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398333","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28332537,0.00017113454,0.6228594,0.0020876708,0.000039091974,0.0007666215,0.00009810714,0.0007332217,0.08991939],"genre_scores_gemma":[0.6739693,0.00011064077,0.31352502,0.00017093729,0.0000061730652,0.00051004253,0.00013559403,0.00013512456,0.011437084],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99316335,0.0042185388,0.0002673895,0.00047045248,0.0015355289,0.0003448314],"domain_scores_gemma":[0.9922145,0.005170334,0.0002825448,0.0004187733,0.0016735332,0.00024020669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00735645,0.0008311337,0.0003564884,0.002609991,0.0022702417,0.004770518,0.0018045033,0.0016450438,0.0058660754],"category_scores_gemma":[0.0072289472,0.00084374513,0.0006908275,0.0013705316,0.0027998602,0.0045585106,0.0025781742,0.0015704047,0.00085595937],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041370504,0.0015935436,0.019375704,0.00049790024,0.0000719708,0.0021846397,0.12979917,0.0122313695,0.029689373,0.2500695,0.0058964966,0.5481766],"study_design_scores_gemma":[0.00019279201,0.0013175199,0.029630493,0.00135707,0.0003165264,0.004584243,0.21589789,0.42120036,0.051795963,0.18454063,0.08877796,0.0003885893],"about_ca_topic_score_codex":0.0049340203,"about_ca_topic_score_gemma":0.008535502,"teacher_disagreement_score":0.00735645,"about_ca_system_score_codex":0.003387455,"about_ca_system_score_gemma":0.005495515,"threshold_uncertainty_score":0.038905084},"labels":[],"label_agreement":null},{"id":"W4408398348","doi":"10.1007/978-3-031-84208-5_55","title":"Spatiotemporal Mapping for Buildings Construction Site Planning and Control","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Université du Québec à Montréal","funders":"","keywords":"Site planning; Geography; Control (management); Cartography; Architectural engineering; Environmental planning; Computer science; Engineering; Artificial intelligence","score_opus":0.006157371314594338,"score_gpt":0.1891771925065732,"score_spread":0.18301982119197885,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398348","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00320538,0.00048705787,0.9930738,0.000055600125,0.000032306245,0.0000135721475,0.00037774205,0.000759165,0.0019953647],"genre_scores_gemma":[0.30535316,0.0023958911,0.6791134,0.000061375125,0.00009185642,0.00018331513,0.0025842802,0.00041213955,0.009804622],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997187,0.000048807215,0.000019685436,0.000084245694,0.00010713637,0.000021394339],"domain_scores_gemma":[0.9998062,0.00007292601,0.000017085898,0.00005106188,0.000045666147,0.0000070775773],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00032811004,0.00058761274,0.000869836,0.0007845583,0.00026264443,0.0010857246,0.00096590765,0.0004142853,0.0032472382],"category_scores_gemma":[0.0008712872,0.00041423537,0.00060447113,0.0016387907,0.00033153108,0.0011822619,0.0010236411,0.00044329598,0.0008645097],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006928858,0.00004147888,0.0006301915,0.0001828194,0.000054003864,0.00007339868,0.00007173568,0.5001477,0.009097236,0.048374906,0.0057600765,0.43549728],"study_design_scores_gemma":[0.0000028661975,0.000012230643,0.0003486039,0.000011136637,0.000009575364,0.000048014954,0.000024380715,0.9689813,0.0025534502,0.019324033,0.008676734,0.000007674411],"about_ca_topic_score_codex":0.008516254,"about_ca_topic_score_gemma":0.008800658,"teacher_disagreement_score":0.008516254,"about_ca_system_score_codex":0.0004857317,"about_ca_system_score_gemma":0.00065414404,"threshold_uncertainty_score":0.016933382},"labels":[],"label_agreement":null},{"id":"W4408398360","doi":"10.1007/978-3-031-84208-5_25","title":"Analysis of the Rationality of Extending LOD Standards from the Design Phase to the Production and Construction Phases","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Rationality; Production (economics); Phase (matter); Computer science; Epistemology; Physics; Philosophy; Economics; Microeconomics; Quantum mechanics","score_opus":0.011010128785015316,"score_gpt":0.23473900825131977,"score_spread":0.22372887946630446,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398360","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.22431068,0.002001232,0.3956153,0.017071618,0.00017208522,0.00028093226,0.00046763738,0.000451941,0.35962847],"genre_scores_gemma":[0.93312407,0.00041995922,0.058167566,0.00061080634,0.00007861475,0.00015823789,0.00017124385,0.00015222162,0.0071172775],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9621412,0.01763338,0.0018508394,0.003983416,0.011428329,0.0029628682],"domain_scores_gemma":[0.8481993,0.11280468,0.0049525155,0.023816174,0.009025908,0.0012014476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.045268256,0.0007851584,0.001337824,0.0030123747,0.0029026584,0.012047744,0.0042642904,0.005034353,0.0064240685],"category_scores_gemma":[0.12237045,0.0016731317,0.0020053897,0.0030108672,0.015566575,0.020537857,0.006437291,0.007523623,0.0010434227],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014512098,0.000060726983,0.0011991907,0.00004350305,0.000024586278,0.0000739233,0.00055709557,0.00923021,0.0006812294,0.97312444,0.00077404163,0.014086107],"study_design_scores_gemma":[0.00007486609,0.00005827514,0.001209751,0.00009707574,0.00008382717,0.000095687545,0.0008878515,0.037516784,0.0021958135,0.95146227,0.0062798173,0.000037946727],"about_ca_topic_score_codex":0.011630165,"about_ca_topic_score_gemma":0.00978505,"teacher_disagreement_score":0.045268256,"about_ca_system_score_codex":0.007657569,"about_ca_system_score_gemma":0.008925596,"threshold_uncertainty_score":0.23940426},"labels":[],"label_agreement":null},{"id":"W4408398491","doi":"10.1007/978-3-031-84208-5_24","title":"Digital Configuration Platforms for Residential Modular Construction Projects: A Comparative Study","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Modular design; Computer science; Systems engineering; Architectural engineering; Engineering; Operating system","score_opus":0.01320393233437628,"score_gpt":0.2225163756408698,"score_spread":0.2093124433064935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408398491","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93530935,0.00071959477,0.00122665,0.00008786919,0.000010151905,0.000055927037,0.00009564937,0.000015331403,0.062479556],"genre_scores_gemma":[0.99429506,0.0006867082,0.0005647,0.000009274279,0.000004559089,0.000023247061,0.0000737383,0.000009190687,0.004333673],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.997509,0.0010862913,0.000078398174,0.00017510231,0.000861247,0.0002899896],"domain_scores_gemma":[0.9936307,0.0037253827,0.0007179558,0.000446389,0.0011615959,0.00031792658],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025727763,0.00044277424,0.00033771852,0.004688794,0.0016672284,0.0032109607,0.001040382,0.00078416103,0.017241502],"category_scores_gemma":[0.008468411,0.0003265413,0.00033177895,0.008272232,0.0020692458,0.0044030217,0.0024106107,0.0005943695,0.0014817711],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003314752,0.0026486283,0.18871678,0.0016058262,0.00012635218,0.0045730053,0.09563225,0.006713855,0.006587128,0.110300265,0.005868849,0.5739123],"study_design_scores_gemma":[0.00009527583,0.004239185,0.5172629,0.0013813064,0.0002808499,0.0038944823,0.35423753,0.0077618808,0.0044090096,0.011667852,0.09465838,0.000111352514],"about_ca_topic_score_codex":0.003345453,"about_ca_topic_score_gemma":0.008321167,"teacher_disagreement_score":0.017241502,"about_ca_system_score_codex":0.0029396177,"about_ca_system_score_gemma":0.0014606272,"threshold_uncertainty_score":0.05767858},"labels":[],"label_agreement":null},{"id":"W4408399022","doi":"10.1007/978-3-031-84208-5_62","title":"An Advanced Work Packaging Inspired Ontology for Industrial Construction Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"PCL Construction (Canada); University of Alberta","funders":"","keywords":"Ontology; Work (physics); Computer science; Systems engineering; Manufacturing engineering; Software engineering; Construction engineering; Architectural engineering; Engineering; Mechanical engineering; Philosophy; Epistemology","score_opus":0.013329347926616726,"score_gpt":0.21536711492111624,"score_spread":0.20203776699449952,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408399022","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0070003327,0.0005366238,0.92586744,0.00069887564,0.0002636454,0.00021873068,0.001585532,0.0020659363,0.06176291],"genre_scores_gemma":[0.0735298,0.0011524048,0.88887966,0.00032519968,0.00005606622,0.00035072834,0.005569592,0.0008527084,0.029283736],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9991779,0.0001679924,0.000117091644,0.00015340117,0.0002999997,0.00008352949],"domain_scores_gemma":[0.99962866,0.000081138336,0.00002502799,0.0001255835,0.00010048088,0.00003909617],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00088670716,0.0005772461,0.0004300366,0.0016277288,0.00096014934,0.0032635892,0.0014465208,0.0012908267,0.005787691],"category_scores_gemma":[0.0010607698,0.00059496146,0.0013136431,0.0028544855,0.001135172,0.005105526,0.002745915,0.0018015433,0.0025537277],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029324754,0.00011339914,0.00084379496,0.00032520384,0.000023476656,0.00040285217,0.0022040317,0.0074949334,0.0043141204,0.78585577,0.020597786,0.17779544],"study_design_scores_gemma":[0.000012268634,0.000019269966,0.00066295476,0.0002489664,0.000038467835,0.00060684525,0.0008590471,0.03674851,0.0024077403,0.18349758,0.7748665,0.000031832857],"about_ca_topic_score_codex":0.0075013875,"about_ca_topic_score_gemma":0.0119166225,"teacher_disagreement_score":0.0075013875,"about_ca_system_score_codex":0.0011770575,"about_ca_system_score_gemma":0.0021070784,"threshold_uncertainty_score":0.019361794},"labels":[],"label_agreement":null},{"id":"W4408399125","doi":"10.1007/978-3-031-84208-5_15","title":"Exploring the Potential of Digital Signature of Building Information Models to Improve Trust, Transparency, and Traceability in Construction Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Traceability; Transparency (behavior); Digital signature; Computer security; Signature (topology); Computer science; Business; Software engineering; Mathematics","score_opus":0.01218088641596167,"score_gpt":0.1830416333859824,"score_spread":0.17086074697002074,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408399125","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19730712,0.000947397,0.7580186,0.0032871272,0.00013901122,0.00012888193,0.00012139387,0.0007650796,0.03928544],"genre_scores_gemma":[0.8922734,0.00044608448,0.103185594,0.00010101971,0.000019590812,0.00004046509,0.00010262248,0.00010142689,0.0037296454],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99388015,0.0037520821,0.00022283998,0.00032763576,0.0014420627,0.00037524058],"domain_scores_gemma":[0.962711,0.028235067,0.0013373872,0.0055089835,0.0018224242,0.00038514158],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073764147,0.00051547616,0.00057848496,0.0010232389,0.0009516353,0.005409088,0.001625336,0.0018041279,0.00454199],"category_scores_gemma":[0.039523844,0.0005624758,0.00088786037,0.0023696732,0.0026129584,0.012400843,0.004635375,0.00292242,0.00045279882],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051807205,0.00040883094,0.0040353476,0.00027394615,0.0000784626,0.00024356318,0.0025376466,0.1896293,0.0054508713,0.54033387,0.0021460725,0.25434417],"study_design_scores_gemma":[0.00004576389,0.00024618785,0.0008768694,0.000090247275,0.00006394531,0.00013109643,0.0010735966,0.56181633,0.0087880455,0.42037767,0.0064363275,0.00005382496],"about_ca_topic_score_codex":0.0036756021,"about_ca_topic_score_gemma":0.0027018327,"teacher_disagreement_score":0.0073764147,"about_ca_system_score_codex":0.0018448471,"about_ca_system_score_gemma":0.0025669937,"threshold_uncertainty_score":0.039010704},"labels":[],"label_agreement":null},{"id":"W4408421119","doi":"10.1007/978-3-031-84208-5_32","title":"Re-modeling of Built Asset Information to Improve and Optimize Asset Management","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal","funders":"","keywords":"Asset (computer security); IT asset management; Asset management; Business; Computer science; Risk analysis (engineering); Finance; Computer security","score_opus":0.005329380067120061,"score_gpt":0.19517373444262703,"score_spread":0.18984435437550698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408421119","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0340565,0.00048638694,0.9371561,0.00038905963,0.00021423252,0.00007783757,0.001727982,0.0063215448,0.019570366],"genre_scores_gemma":[0.6332489,0.0009922744,0.342327,0.0002014642,0.00008164277,0.00009041989,0.004806235,0.0020445,0.01620742],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996232,0.0000588386,0.000024406338,0.00006910319,0.00018653966,0.000037944847],"domain_scores_gemma":[0.99938,0.00014260554,0.000043480497,0.00020665707,0.00020098047,0.00002626523],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005156725,0.001122376,0.0010393957,0.0010550402,0.0003248856,0.0028852155,0.0017070123,0.00080158195,0.0073984605],"category_scores_gemma":[0.0016330983,0.0006700053,0.0012757678,0.0012480636,0.00031699036,0.0029048352,0.0010633994,0.0010097558,0.0029224714],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049046088,0.00010946788,0.0026580766,0.00010906732,0.00009911126,0.00013439739,0.000104673374,0.8682928,0.007595133,0.0077251494,0.0062387884,0.10688434],"study_design_scores_gemma":[0.0000038125931,0.000010048112,0.00043003145,0.000018267005,0.000027983573,0.00003201779,0.000029207717,0.98489803,0.003978247,0.004392535,0.006166088,0.000013655076],"about_ca_topic_score_codex":0.01568023,"about_ca_topic_score_gemma":0.02727005,"teacher_disagreement_score":0.01568023,"about_ca_system_score_codex":0.0009769277,"about_ca_system_score_gemma":0.0010930342,"threshold_uncertainty_score":0.031177938},"labels":[],"label_agreement":null},{"id":"W4408421129","doi":"10.1007/978-3-031-84208-5_44","title":"Guidelines for Designing a Facility Management Digital Twin Dashboard","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Fuseforward (Canada); Toronto Metropolitan University","funders":"","keywords":"Dashboard; Computer science; Database","score_opus":0.01894341824324325,"score_gpt":0.22998022809627552,"score_spread":0.21103680985303228,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408421129","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021415257,0.00026680762,0.9334157,0.0003140151,0.00014422099,0.0010881105,0.0008950433,0.006680535,0.055053983],"genre_scores_gemma":[0.012935629,0.00039974842,0.9349175,0.00014011956,0.00001652057,0.0009060609,0.0016967739,0.0015417635,0.047446],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99772257,0.00043229695,0.0002511486,0.0001810906,0.0012570532,0.00015573394],"domain_scores_gemma":[0.9969404,0.00061133533,0.000106565705,0.00047596748,0.0016856466,0.00018004698],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0028686519,0.0016069417,0.0005301696,0.003066666,0.0013690986,0.005064115,0.002352172,0.0020044537,0.04938499],"category_scores_gemma":[0.0065955054,0.0012893522,0.0006378472,0.0025437507,0.0008173917,0.0040452294,0.0023972301,0.0020117231,0.023511296],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009304412,0.00030808322,0.0013803132,0.00096498645,0.00003301424,0.0007297746,0.0018611111,0.02426059,0.032820247,0.1678165,0.09435017,0.67538226],"study_design_scores_gemma":[0.000036392168,0.00010278906,0.00090327265,0.00070627226,0.00003604703,0.000544958,0.0009864169,0.03625478,0.026774121,0.03338187,0.9001912,0.00008191315],"about_ca_topic_score_codex":0.004561727,"about_ca_topic_score_gemma":0.00959936,"teacher_disagreement_score":0.04938499,"about_ca_system_score_codex":0.00094653445,"about_ca_system_score_gemma":0.0021956542,"threshold_uncertainty_score":0.16520923},"labels":[],"label_agreement":null},{"id":"W4408623108","doi":"10.51594/estj.v6i2.1830","title":"Building Information Modelling (BIM) for construction project management: A literature bibliometric analysis approach","year":2025,"lang":"en","type":"article","venue":"Engineering Science & Technology Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Computer science; Engineering; Construction engineering; Operations management","score_opus":0.005920087760094467,"score_gpt":0.22658058917839669,"score_spread":0.2206605014183022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408623108","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28096566,0.23412915,0.07984723,0.016069094,0.0010295693,0.0052783038,0.03629196,0.0011404883,0.34524858],"genre_scores_gemma":[0.73925936,0.14018545,0.092504084,0.00058862125,0.00072947727,0.004256499,0.013854781,0.00015608026,0.008465661],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98621535,0.0032422366,0.002058943,0.0006967709,0.007378691,0.00040797624],"domain_scores_gemma":[0.9735457,0.01655512,0.0034370837,0.0010153356,0.0050315727,0.00041513288],"candidate_categories":["bibliometrics"],"consensus_categories":[],"category_scores_codex":[0.011623831,0.0009354914,0.0016780819,0.2081809,0.0027302683,0.00909416,0.0012793989,0.001009559,0.0059564114],"category_scores_gemma":[0.03808434,0.000432911,0.0018541339,0.2500496,0.0016342144,0.006389335,0.0041719954,0.0006649985,0.0008153085],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114898015,0.0001728217,0.044549134,0.0346919,0.0009086065,0.0009880653,0.0106770145,0.0044137714,0.0017941683,0.089340895,0.025389062,0.78695965],"study_design_scores_gemma":[0.00008641536,0.0003156418,0.23521252,0.04122246,0.0037077204,0.0028991052,0.05101742,0.022917483,0.0054552224,0.11997211,0.51681507,0.00037873513],"about_ca_topic_score_codex":0.0077928375,"about_ca_topic_score_gemma":0.0083115995,"teacher_disagreement_score":0.7918191,"about_ca_system_score_codex":0.006465306,"about_ca_system_score_gemma":0.012457394,"threshold_uncertainty_score":0.06147343},"labels":[],"label_agreement":null},{"id":"W4408654474","doi":"10.5006/mp2014_53_11-32","title":"Cost Effective Cathodic Protection System for Concrete Structures","year":2014,"lang":"en","type":"article","venue":"Materials performance","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Barrie Urology Group","funders":"","keywords":"Cathodic protection; Forensic engineering; Galvanic anode; Materials science; Corrosion; Engineering; Metallurgy; Electrochemistry; Chemistry","score_opus":0.008985806292215487,"score_gpt":0.20351534764603105,"score_spread":0.19452954135381556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408654474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5699007,0.0021381811,0.41111693,0.0003086176,0.00017753747,0.00020215657,0.00044242648,0.002265406,0.013448041],"genre_scores_gemma":[0.8911617,0.00060469774,0.097700424,0.00007496135,0.000033066157,0.00009971896,0.00032778105,0.000060601433,0.009937104],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997714,0.00001652965,0.000009021811,0.000034204433,0.00014825995,0.00002058202],"domain_scores_gemma":[0.9998336,0.00001867859,0.000030888852,0.00002583431,0.00007111509,0.000019823103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015045101,0.00036839434,0.00025237844,0.00044054163,0.00024252747,0.00029622135,0.000695186,0.0003322325,0.0022357735],"category_scores_gemma":[0.0002400608,0.00024381542,0.00019138733,0.00023318522,0.00015018112,0.00042799072,0.00051207555,0.00038653385,0.0007740765],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000082412414,0.000029620185,0.0005985159,0.00015751224,0.00000936205,0.0001472712,0.000045796947,0.0007965974,0.9539227,0.0008976352,0.0006357667,0.04267678],"study_design_scores_gemma":[0.00002955745,0.00034217912,0.004241384,0.00001416306,0.00003644564,0.00090812653,0.00003311749,0.010099571,0.96696,0.00019748302,0.017115885,0.000022168544],"about_ca_topic_score_codex":0.00056692294,"about_ca_topic_score_gemma":0.0009907556,"teacher_disagreement_score":0.0022357735,"about_ca_system_score_codex":0.00034640037,"about_ca_system_score_gemma":0.00046418936,"threshold_uncertainty_score":0.0074793696},"labels":[],"label_agreement":null},{"id":"W4408727525","doi":"10.1680/jensu.23.00041","title":"Retrofitting of building components using Building Information Modelling for sustainability","year":2025,"lang":"en","type":"article","venue":"Proceedings of the Institution of Civil Engineers - Engineering Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Retrofitting; Sustainability; Architectural engineering; Construction engineering; Building information modeling; Computer science; Engineering; Structural engineering; Operations management","score_opus":0.006974280786642538,"score_gpt":0.2190565852055982,"score_spread":0.21208230441895567,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408727525","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0233097,0.00037187405,0.95956725,0.00023443738,0.00008556374,0.00016014755,0.0007429368,0.0026671397,0.012860856],"genre_scores_gemma":[0.45175812,0.0011874977,0.5375064,0.00006744592,0.000028154655,0.0005191158,0.0016849794,0.0005286215,0.0067195855],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995086,0.00014788395,0.000034076686,0.000049241436,0.00022387362,0.000036332192],"domain_scores_gemma":[0.9994479,0.00027761087,0.000048355025,0.00011103306,0.00009717532,0.000017929673],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008037952,0.0010428086,0.00067879795,0.00128924,0.0005027381,0.0022070894,0.0010693118,0.0010559874,0.004516095],"category_scores_gemma":[0.0018384571,0.0006437893,0.0018293904,0.0015246172,0.0004995755,0.0014094186,0.0011002597,0.0008912545,0.000894193],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021009957,0.00003797785,0.00071948813,0.000111463865,0.000038022496,0.000060960945,0.0001142388,0.9535876,0.0023870969,0.0129610915,0.00069720484,0.029263796],"study_design_scores_gemma":[0.0000061917713,0.000017787639,0.00023968311,0.00003709275,0.000018587674,0.000032656935,0.00003500085,0.9828147,0.0020144565,0.006981139,0.0077827885,0.000019856494],"about_ca_topic_score_codex":0.008787669,"about_ca_topic_score_gemma":0.009781783,"teacher_disagreement_score":0.008787669,"about_ca_system_score_codex":0.0011104532,"about_ca_system_score_gemma":0.0011406351,"threshold_uncertainty_score":0.017473042},"labels":[],"label_agreement":null},{"id":"W4408739210","doi":"10.23977/jaip.2025.080113","title":"Intelligent design and dynamic adaptation model of building facade based on artificial intelligence","year":2025,"lang":"en","type":"article","venue":"Journal of Artificial Intelligence Practice","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Facade; Adaptation (eye); Architectural engineering; Computer science; Artificial intelligence; Engineering; Civil engineering; Psychology","score_opus":0.06069280218206569,"score_gpt":0.32118288920734994,"score_spread":0.26049008702528426,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408739210","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02075884,0.00021032902,0.97189474,0.000118715034,0.00003087224,0.0000421603,0.00003921382,0.0004901518,0.0064149844],"genre_scores_gemma":[0.88183993,0.00045608237,0.11053109,0.000052548396,0.000023287364,0.00020982667,0.00014067483,0.000063816115,0.006682857],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996973,0.000051197716,0.00001404902,0.000085906024,0.0001142958,0.000037273643],"domain_scores_gemma":[0.99987674,0.000028532755,0.000021021426,0.000016123282,0.00004736759,0.0000103064485],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00027440756,0.0006918527,0.0005682411,0.00073463446,0.0004822961,0.000843266,0.0010871793,0.0007688715,0.0018730583],"category_scores_gemma":[0.00048404952,0.00043779117,0.0008508628,0.00059266755,0.00054470706,0.0009930563,0.0006946579,0.00048301014,0.0003196342],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000025514086,0.000024345361,0.0009139882,0.00004623155,0.00002527503,0.0000682638,0.000072109404,0.96032304,0.0037843157,0.007774003,0.0004195718,0.026523426],"study_design_scores_gemma":[0.0000031869185,0.00001377003,0.00019734206,0.00000312997,0.00000957316,0.000020848238,0.0000098540595,0.99730194,0.00045379045,0.0012264091,0.00075402507,0.0000061340306],"about_ca_topic_score_codex":0.011018215,"about_ca_topic_score_gemma":0.0087931575,"teacher_disagreement_score":0.011018215,"about_ca_system_score_codex":0.0007930414,"about_ca_system_score_gemma":0.0010028204,"threshold_uncertainty_score":0.021908164},"labels":[],"label_agreement":null},{"id":"W4408778588","doi":"10.3390/su17072877","title":"Integrating Building Information Modeling and Life Cycle Assessment to Enhance the Decisions Related to Selecting Construction Methods at the Conceptual Design Stage of Buildings","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":7,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Ottawa","funders":"","keywords":"Building information modeling; Stage (stratigraphy); Life-cycle assessment; Architectural engineering; Construction engineering; Conceptual design; Computer science; Systems engineering; Management science; Engineering; Process management; Risk analysis (engineering); Operations management; Business; Production (economics); Human–computer interaction","score_opus":0.010270131185869828,"score_gpt":0.33322496024491227,"score_spread":0.32295482905904244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408778588","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.025737137,0.00089086825,0.9461551,0.001336054,0.00005531751,0.00029921537,0.00039730727,0.0005030183,0.024625966],"genre_scores_gemma":[0.4390952,0.0017289277,0.5552187,0.00021276438,0.00003403373,0.00041547662,0.0010216178,0.00011349111,0.002159906],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974986,0.0012476129,0.00013487556,0.00016248663,0.00081959023,0.00013690865],"domain_scores_gemma":[0.99711764,0.0015061352,0.00028378103,0.0004092339,0.00060300186,0.000080224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033915865,0.0011014354,0.000536675,0.0033845278,0.00062447804,0.0034336238,0.001194446,0.0011779941,0.0023069114],"category_scores_gemma":[0.0059503694,0.0005725772,0.0012895868,0.0028512434,0.000855101,0.004178246,0.002179044,0.0009419071,0.00058881525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006421932,0.00032765645,0.008333503,0.0004677554,0.00015969005,0.0002076348,0.0005482234,0.6173887,0.004065781,0.14093977,0.0025252306,0.22497192],"study_design_scores_gemma":[0.000015374762,0.00010585685,0.0023713706,0.00030503713,0.00010225994,0.00010188837,0.00048298627,0.87638414,0.004690914,0.086305015,0.029061304,0.00007386553],"about_ca_topic_score_codex":0.006539975,"about_ca_topic_score_gemma":0.010987321,"teacher_disagreement_score":0.006539975,"about_ca_system_score_codex":0.0023307565,"about_ca_system_score_gemma":0.00422607,"threshold_uncertainty_score":0.017936647},"labels":[],"label_agreement":null},{"id":"W4408813104","doi":"10.3390/architecture5020022","title":"Life Cycle Homes for Adaptability, Circularity, and Sustainability","year":2025,"lang":"en","type":"article","venue":"Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Adaptability; Sustainability; Computer science; Biology; Ecology","score_opus":0.003997414508288337,"score_gpt":0.21834362843253283,"score_spread":0.2143462139242445,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408813104","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.10438729,0.014297166,0.2866878,0.021923311,0.0008720312,0.00024823964,0.0001365035,0.00046108922,0.5709867],"genre_scores_gemma":[0.8544074,0.0045214375,0.10463841,0.0014964151,0.00013833921,0.00027269212,0.00006474054,0.00009814913,0.034362413],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99898404,0.00055246655,0.000038006496,0.00011786116,0.00020321978,0.00010440824],"domain_scores_gemma":[0.9994381,0.00021105663,0.000056510853,0.000115442104,0.000094279705,0.000084680396],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001190313,0.00035797685,0.00017954886,0.0005695709,0.0020930395,0.0036256006,0.000635689,0.0010840498,0.0072149537],"category_scores_gemma":[0.0014741318,0.00014759085,0.0003148195,0.000676321,0.0070320033,0.0041212393,0.0039789747,0.0010488239,0.0005202504],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000011399271,0.000024521381,0.0005172923,0.000086515676,0.0000038405396,0.000098809665,0.0053226533,0.00067425246,0.0005524906,0.941931,0.004077909,0.04669933],"study_design_scores_gemma":[0.000010409878,0.000117494965,0.0026818474,0.00040786047,0.000014626382,0.00068555644,0.011837043,0.0026520279,0.0016068635,0.49108708,0.48885664,0.000042542735],"about_ca_topic_score_codex":0.0016298409,"about_ca_topic_score_gemma":0.0036897734,"teacher_disagreement_score":0.0072149537,"about_ca_system_score_codex":0.0019622077,"about_ca_system_score_gemma":0.0016454479,"threshold_uncertainty_score":0.024136484},"labels":[],"label_agreement":null},{"id":"W4408872967","doi":"10.1061/9780784485910.040","title":"Simulation-Based Modular Construction Shop Floor Design for Productivity Optimization","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Productivity; Computer science; Modular construction; Industrial engineering; Manufacturing engineering; Engineering; Programming language","score_opus":0.013283074590521709,"score_gpt":0.2291192954590902,"score_spread":0.2158362208685685,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408872967","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046816096,0.000139446,0.9451331,0.00008017736,0.000032284537,0.000112144226,0.00007477843,0.0004884798,0.00712354],"genre_scores_gemma":[0.81010544,0.00026398635,0.18625322,0.000026553631,0.00000934492,0.00027409248,0.00014284304,0.00007668657,0.0028478515],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996766,0.000104662926,0.000013583019,0.00004142277,0.00010652294,0.00005725153],"domain_scores_gemma":[0.9994949,0.0002520128,0.00007309335,0.000034375887,0.000110043446,0.000035532164],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007360686,0.00078866037,0.00072036625,0.0007176443,0.00042911293,0.00077278266,0.00076404767,0.0006848123,0.0036276162],"category_scores_gemma":[0.0009819574,0.0005005417,0.0009639316,0.00055377616,0.00044197906,0.00039246786,0.00071390724,0.00047189576,0.00031388746],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012746204,0.0000116635365,0.00017123121,0.000015945494,0.0000048387624,0.000013356124,0.000010264128,0.994947,0.0011180494,0.00087946845,0.00005258936,0.002762923],"study_design_scores_gemma":[0.000004487454,0.000015274487,0.000060501825,0.0000033398917,0.0000035364403,0.0000043936475,0.000006130816,0.99875844,0.0004370692,0.0004157038,0.00028881457,0.0000022749296],"about_ca_topic_score_codex":0.0048249797,"about_ca_topic_score_gemma":0.0053546797,"teacher_disagreement_score":0.0048249797,"about_ca_system_score_codex":0.0008167384,"about_ca_system_score_gemma":0.0017767882,"threshold_uncertainty_score":0.012135625},"labels":[],"label_agreement":null},{"id":"W4408963024","doi":"10.61091/jcmcc125-26","title":"Research on balancing strategies between modularization and personalization in prefabricated building design and simulation","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular programming; Personalization; Architectural engineering; Computer science; Mass customization; Engineering; Systems engineering; World Wide Web; Programming language","score_opus":0.02725382913677415,"score_gpt":0.30521743382505206,"score_spread":0.2779636046882779,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408963024","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11170937,0.0012466569,0.8590071,0.00043141897,0.00006793548,0.000116624,0.000039699913,0.00030372877,0.027077496],"genre_scores_gemma":[0.87081736,0.0013888488,0.12176868,0.000069232556,0.00003477429,0.00016637763,0.00008088772,0.00007090282,0.0056029805],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9993661,0.00023771192,0.000028930892,0.00011553897,0.00018196569,0.000069823094],"domain_scores_gemma":[0.99949455,0.00021546891,0.000054436226,0.00007004917,0.000113275375,0.000052153722],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009206986,0.00066429446,0.00045761248,0.0007616582,0.00059133564,0.0011234393,0.00079351355,0.0005466804,0.004316083],"category_scores_gemma":[0.0022131673,0.00032570586,0.0007973877,0.0006664304,0.00062070444,0.0017872391,0.00094523304,0.00053962955,0.00032138202],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007560791,0.00013654836,0.006180338,0.00025993556,0.000073614836,0.00008341082,0.00068592536,0.7613454,0.0078917565,0.062438197,0.0012959647,0.15953328],"study_design_scores_gemma":[0.000020523748,0.00010193218,0.0014992215,0.000036143905,0.000044013457,0.00005374436,0.00021679809,0.9729677,0.00251418,0.016061736,0.0064634085,0.000020708188],"about_ca_topic_score_codex":0.0035344905,"about_ca_topic_score_gemma":0.003096323,"teacher_disagreement_score":0.004316083,"about_ca_system_score_codex":0.0008431724,"about_ca_system_score_gemma":0.00089665945,"threshold_uncertainty_score":0.014438748},"labels":[],"label_agreement":null},{"id":"W4408994207","doi":"10.1061/jcemd4.coeng-15335","title":"Enhancing the Manufacturing Process in Light-Gauge Steel Off-Site Construction Using Semiautomation","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure","funders":"","keywords":"Gauge (firearms); Process (computing); Manufacturing engineering; Engineering; Materials science; Computer science; Metallurgy","score_opus":0.0029992384564745574,"score_gpt":0.1955731219444556,"score_spread":0.19257388348798105,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4408994207","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20229796,0.0003650772,0.78090614,0.00029126427,0.000056805133,0.0005949265,0.00017267473,0.0023465056,0.012968594],"genre_scores_gemma":[0.41523197,0.00028489443,0.58006537,0.0000675958,0.0000129992895,0.0002906253,0.00026849713,0.00016036397,0.0036176061],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99782526,0.0008013947,0.00013029666,0.00032021824,0.00073868997,0.0001842306],"domain_scores_gemma":[0.9965113,0.0011906385,0.00045708113,0.0012250348,0.00048691125,0.00012900855],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020768207,0.00066263904,0.00042360707,0.0011350234,0.0006526256,0.0013723609,0.0011859343,0.00059440825,0.0033235839],"category_scores_gemma":[0.003160674,0.00035218385,0.0006985682,0.0011306879,0.0007621486,0.0011614807,0.0014083043,0.00049432047,0.001095453],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004617357,0.0006589995,0.009328541,0.0010994961,0.00003664935,0.00057590124,0.0021435109,0.07478371,0.10654346,0.009819691,0.0022438494,0.79230434],"study_design_scores_gemma":[0.0003907923,0.004487897,0.07523419,0.00076088024,0.00022184075,0.0029230008,0.0045373593,0.4305377,0.23410082,0.035192925,0.21107481,0.0005378029],"about_ca_topic_score_codex":0.002967038,"about_ca_topic_score_gemma":0.0047185933,"teacher_disagreement_score":0.0033235839,"about_ca_system_score_codex":0.0009517364,"about_ca_system_score_gemma":0.002956265,"threshold_uncertainty_score":0.011118472},"labels":[],"label_agreement":null},{"id":"W4409198938","doi":"10.1016/b978-0-443-23718-8.00011-9","title":"Application of multicriteria decision making for ranking and selection of biocomposites for external strengthening of concrete: a case study","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"","keywords":"Ranking (information retrieval); Selection (genetic algorithm); Operations research; Computer science; Mathematics; Machine learning","score_opus":0.009585281841288984,"score_gpt":0.26126323020549747,"score_spread":0.2516779483642085,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409198938","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09278367,0.00039971306,0.89226425,0.00039961396,0.00008553009,0.00055735884,0.00028745175,0.0003175553,0.012904988],"genre_scores_gemma":[0.35247412,0.00019531141,0.6444215,0.000057879817,0.000019331701,0.00039409372,0.00016349614,0.00006033824,0.0022139843],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99404776,0.0032731667,0.00053775514,0.00060582097,0.0011792674,0.0003561478],"domain_scores_gemma":[0.9848141,0.012474208,0.00068477145,0.000508121,0.0013275419,0.00019127947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008049368,0.0015434368,0.0020702365,0.0024807279,0.0012927381,0.0040699774,0.0016140061,0.0015718297,0.005015588],"category_scores_gemma":[0.012550792,0.0009168159,0.0020802498,0.0028806634,0.001183349,0.0018721118,0.0021614311,0.0012812878,0.00052230747],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006720656,0.00069965684,0.003830721,0.0006120435,0.00034153947,0.0005913667,0.0010386681,0.66441333,0.0059916815,0.03674197,0.0021984451,0.2828686],"study_design_scores_gemma":[0.00004011076,0.00023562109,0.0006689863,0.00006564105,0.0000637826,0.0001337769,0.0004001658,0.97111356,0.0034716004,0.021944813,0.0018150271,0.000046907157],"about_ca_topic_score_codex":0.0045415866,"about_ca_topic_score_gemma":0.005762077,"teacher_disagreement_score":0.008049368,"about_ca_system_score_codex":0.0021626821,"about_ca_system_score_gemma":0.0026467156,"threshold_uncertainty_score":0.042569637},"labels":[],"label_agreement":null},{"id":"W4409253772","doi":"10.1007/978-3-031-87364-5_53","title":"Automated Stakeout Survey for Efficient Earthwork Construction Project Control","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Earthworks; Control (management); Engineering; Computer science; Construction engineering; Artificial intelligence; Geotechnical engineering","score_opus":0.009571778823065024,"score_gpt":0.2108342971736058,"score_spread":0.20126251835054076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409253772","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03202577,0.00011203834,0.9577923,0.000029094876,0.000030268548,0.000063958905,0.00031018173,0.005397586,0.004238782],"genre_scores_gemma":[0.75115293,0.0001255874,0.2410319,0.000028064354,0.00002019284,0.00011605613,0.0009939449,0.00036169085,0.0061695753],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99953675,0.00006146736,0.000017171878,0.00010698741,0.00021612074,0.00006148805],"domain_scores_gemma":[0.999602,0.000110237386,0.000044011365,0.0000909327,0.00012431611,0.000028554829],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002838119,0.0008427568,0.0010295337,0.00089199666,0.0004123421,0.0008245195,0.0009223317,0.00044569952,0.0074008172],"category_scores_gemma":[0.0007517504,0.0004450697,0.0003355326,0.000822957,0.00026993584,0.0008340791,0.0013230748,0.00039438327,0.0016262108],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047213017,0.0001480385,0.0039231726,0.00015689443,0.00003452823,0.00014245375,0.00018083701,0.14800742,0.08129757,0.005171417,0.008307178,0.75215846],"study_design_scores_gemma":[0.000016634416,0.000096635544,0.0033239783,0.000012663476,0.000011557539,0.00007803144,0.00008063437,0.96684974,0.019414883,0.0032543335,0.0068435846,0.000017308226],"about_ca_topic_score_codex":0.0028436615,"about_ca_topic_score_gemma":0.005096667,"teacher_disagreement_score":0.0074008172,"about_ca_system_score_codex":0.0004231782,"about_ca_system_score_gemma":0.00071955496,"threshold_uncertainty_score":0.02475816},"labels":[],"label_agreement":null},{"id":"W4409276712","doi":"10.1061/jcemd4.coeng-15014","title":"Evaluating the Potential Impact of Building Design Strategies on Material Recovery during Deconstruction","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Waterloo","funders":"","keywords":"Deconstruction (building); Architectural engineering; Construction engineering; Engineering; Waste management","score_opus":0.008487392371202229,"score_gpt":0.2564341499210844,"score_spread":0.24794675754988216,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409276712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9640021,0.00016852173,0.02418081,0.00008261334,0.0000037379475,0.000291596,0.00013397097,0.000033008942,0.011103612],"genre_scores_gemma":[0.980586,0.0001322087,0.018456329,0.000007647505,5.0609793e-7,0.000059944803,0.00006848733,0.000007730276,0.0006812914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.99877185,0.0005148007,0.000038270457,0.00007468764,0.00042862166,0.00017174215],"domain_scores_gemma":[0.99798214,0.0012057826,0.00023920806,0.00012230738,0.00040121327,0.00004936973],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027181623,0.0008429512,0.00034181032,0.0010305223,0.0004026228,0.0013456022,0.00059935363,0.0005537334,0.0014843238],"category_scores_gemma":[0.0040270044,0.00022615885,0.0004989885,0.0007320756,0.0007059769,0.0010658477,0.0006435301,0.00031764625,0.00013480008],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00048063346,0.00045177218,0.032097977,0.00035482977,0.000114339025,0.00021230188,0.00035330304,0.83638203,0.022563525,0.008658191,0.00024023709,0.09809089],"study_design_scores_gemma":[0.00008883926,0.003629221,0.045986615,0.00012423581,0.0002769345,0.00012660377,0.0023954904,0.87689954,0.057987403,0.0076292236,0.0047669057,0.00008892292],"about_ca_topic_score_codex":0.018757956,"about_ca_topic_score_gemma":0.049707983,"teacher_disagreement_score":0.018757956,"about_ca_system_score_codex":0.0038829674,"about_ca_system_score_gemma":0.002811959,"threshold_uncertainty_score":0.037297547},"labels":[],"label_agreement":null},{"id":"W4409602118","doi":"10.61091/jcmcc127b-037","title":"An overall structural performance modeling and multi-objective optimization design method for Huizhou architecture based on BIM platform","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architecture; Computer science; Building information modeling; Engineering; Systems engineering; Operations management","score_opus":0.015018149701936162,"score_gpt":0.2625219125733996,"score_spread":0.24750376287146342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409602118","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0077579604,0.000089325265,0.9864991,0.000042902404,0.000015042203,0.000047789483,0.00006203179,0.00027707205,0.0052088588],"genre_scores_gemma":[0.43571052,0.00052262243,0.5540764,0.000069725495,0.000026558084,0.00088613067,0.0005496459,0.00021080031,0.007947638],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996346,0.00008001416,0.000013709293,0.00007247887,0.00016244681,0.000036798247],"domain_scores_gemma":[0.99985194,0.00003846909,0.000019585475,0.000012387144,0.000069638736,0.000008081165],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00072302483,0.0011579246,0.0006735021,0.0008215506,0.0006110874,0.00090263586,0.0010589745,0.00066929497,0.0042841807],"category_scores_gemma":[0.0005544926,0.00060846494,0.0011246423,0.00067895773,0.00034992862,0.000698077,0.00088234653,0.00065748725,0.00063630973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015241318,0.000020372725,0.00041528343,0.00008323077,0.000016219241,0.000035753746,0.00004401113,0.9613292,0.0031002238,0.0046679173,0.00046931102,0.029803231],"study_design_scores_gemma":[0.0000038432822,0.000021021835,0.00014507251,0.000006294851,0.000008937654,0.000012509032,0.000014142265,0.9968741,0.0006468786,0.00082375354,0.001438868,0.0000045367406],"about_ca_topic_score_codex":0.009782481,"about_ca_topic_score_gemma":0.009541433,"teacher_disagreement_score":0.009782481,"about_ca_system_score_codex":0.0006527745,"about_ca_system_score_gemma":0.0017807598,"threshold_uncertainty_score":0.019451082},"labels":[],"label_agreement":null},{"id":"W4409604920","doi":"10.61091/jcmcc127b-277","title":"A study of enhancement strategies for artificial intelligence-based automated design tools in complex design tasks","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Artificial intelligence; Systems engineering; Human–computer interaction; Engineering","score_opus":0.0665637075668588,"score_gpt":0.30627180399233733,"score_spread":0.23970809642547852,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409604920","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.114559695,0.000701121,0.8748878,0.00022776765,0.000023743783,0.00010903218,0.000009411428,0.0003569557,0.009124519],"genre_scores_gemma":[0.8597487,0.00034634455,0.13628696,0.00007515312,0.000015122313,0.000082156635,0.000020522613,0.000038623064,0.0033863736],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99956936,0.0001541564,0.000023403565,0.000094363684,0.00012077418,0.00003787783],"domain_scores_gemma":[0.99891317,0.00059320783,0.00011892821,0.00013985546,0.00018963522,0.00004514639],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009850633,0.0005576616,0.00034092058,0.00044555936,0.00023833256,0.0006119171,0.00069998996,0.00045056912,0.0019626587],"category_scores_gemma":[0.0037178774,0.0003087602,0.0003613161,0.00021978126,0.00059439807,0.0018336803,0.0005472669,0.0005132921,0.0002247877],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019854907,0.0003207769,0.0025206057,0.00034205988,0.000056434958,0.00019659517,0.00091526966,0.3510353,0.046658237,0.06513843,0.0013650764,0.53125274],"study_design_scores_gemma":[0.000012961474,0.000132953,0.0004911953,0.000015084821,0.0000140196535,0.00005622261,0.00004895604,0.9861742,0.0052724564,0.0061333906,0.0016420763,0.000006418555],"about_ca_topic_score_codex":0.001379283,"about_ca_topic_score_gemma":0.0009204451,"teacher_disagreement_score":0.0019626587,"about_ca_system_score_codex":0.00055707456,"about_ca_system_score_gemma":0.0005789246,"threshold_uncertainty_score":0.0065657496},"labels":[],"label_agreement":null},{"id":"W4409718705","doi":"10.1139/cjce-2024-0525","title":"A decision support system for evaluating construction project recovery plans","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Decision support system; Computer science; Engineering; Construction engineering; Civil engineering; Operations research","score_opus":0.011555535386180277,"score_gpt":0.2275647429202217,"score_spread":0.2160092075340414,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409718705","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08672609,0.00021472372,0.8726134,0.00040663342,0.00013625638,0.00072297244,0.003636275,0.024991073,0.01055255],"genre_scores_gemma":[0.68397987,0.00019384276,0.31005463,0.00010943994,0.00003231671,0.0005675393,0.0024159234,0.000159195,0.002487256],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994041,0.00013739314,0.00009572717,0.00011080765,0.00021667624,0.000035288675],"domain_scores_gemma":[0.998257,0.00074943376,0.0001874064,0.00015705024,0.0005435133,0.00010562372],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014732518,0.0008689272,0.000795094,0.0025352417,0.0005906491,0.0016826334,0.0009718506,0.00072629337,0.009243264],"category_scores_gemma":[0.005135502,0.00030580166,0.00044492586,0.0009464208,0.00022218659,0.0011701767,0.0007628251,0.0004562987,0.0017694186],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0017478056,0.0005907009,0.014410502,0.0004219412,0.00023909964,0.0005248217,0.00033559048,0.45782894,0.020830568,0.011550634,0.015390506,0.47612888],"study_design_scores_gemma":[0.00008430656,0.00013302959,0.0012002187,0.000042094205,0.000054265976,0.000052331958,0.00005713238,0.9842451,0.0049515283,0.003282433,0.005863636,0.0000338351],"about_ca_topic_score_codex":0.006149989,"about_ca_topic_score_gemma":0.004335759,"teacher_disagreement_score":0.009243264,"about_ca_system_score_codex":0.0009466666,"about_ca_system_score_gemma":0.0014157203,"threshold_uncertainty_score":0.030921757},"labels":[],"label_agreement":null},{"id":"W4409729820","doi":"10.3390/app15094682","title":"An Integrated Planning and Control Framework (IPCF) for Construction Projects—Step 1: Development of the Construction Data Hub (CDH)","year":2025,"lang":"en","type":"article","venue":"Applied Sciences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Construction engineering; Process management; Engineering","score_opus":0.025481000999450575,"score_gpt":0.2703481707676143,"score_spread":0.24486716976816372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409729820","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002974918,0.00009374324,0.9868362,0.0006551392,0.00003675207,0.0009977123,0.00078966946,0.0016658999,0.005949958],"genre_scores_gemma":[0.0529321,0.00014962892,0.9427993,0.00008446653,0.000026004014,0.001109984,0.0017395663,0.00011769883,0.0010412696],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99154377,0.0025126971,0.0007889538,0.0012988014,0.0032889352,0.0005668437],"domain_scores_gemma":[0.9920649,0.0027408705,0.0008319319,0.0012020726,0.002804116,0.0003560515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01811306,0.0014914697,0.0010003286,0.007539655,0.0015463082,0.0068740114,0.0033801673,0.0015778817,0.0032485642],"category_scores_gemma":[0.013729905,0.000910632,0.0015771579,0.0041508772,0.0025173966,0.00564998,0.00339566,0.0021286346,0.000969478],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007153363,0.00033013592,0.008212023,0.00054197904,0.00010562401,0.00028189982,0.0014262091,0.24199066,0.0019814838,0.41664207,0.014306617,0.3141098],"study_design_scores_gemma":[0.000093008675,0.0003518951,0.008321755,0.0009990263,0.00009788456,0.00038387056,0.0023797497,0.62807643,0.006326952,0.17974712,0.17292705,0.00029522728],"about_ca_topic_score_codex":0.034283046,"about_ca_topic_score_gemma":0.022005143,"teacher_disagreement_score":0.034283046,"about_ca_system_score_codex":0.0064551905,"about_ca_system_score_gemma":0.018619064,"threshold_uncertainty_score":0.095792174},"labels":[],"label_agreement":null},{"id":"W4409787556","doi":"10.61091/jcmcc127a-361","title":"Optimized calculation of bearing capacity of short columns of steel-tube-concrete hybrid structures combined with genetic algorithm","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"West Anhui University; Anhui Provincial Department of Education; Anhui University","keywords":"Genetic algorithm; Bearing capacity; Structural engineering; Tube (container); Algorithm; Materials science; Bearing (navigation); Computer science; Engineering; Composite material; Mathematics; Mathematical optimization; Artificial intelligence","score_opus":0.007317211942678495,"score_gpt":0.21206953484547938,"score_spread":0.20475232290280088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787556","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24316151,0.00014078712,0.7512917,0.000054472628,0.000017908464,0.000051823023,0.000072333045,0.00037752552,0.004831949],"genre_scores_gemma":[0.8330374,0.0000663536,0.16537303,0.000016446864,0.0000066128423,0.000081177575,0.00010460711,0.000065329055,0.001249112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9999144,0.000020624675,0.000003138271,0.000015768972,0.000031963533,0.000014177783],"domain_scores_gemma":[0.99987304,0.0000625825,0.000016274382,0.000008366956,0.00003288849,0.0000068232075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00021402117,0.0003630437,0.00042404945,0.00045888816,0.00020228793,0.00031813813,0.00045755444,0.00048437747,0.00083188247],"category_scores_gemma":[0.00041584863,0.00024683247,0.00044511806,0.0003837113,0.00026885298,0.00030075337,0.00020848673,0.0002047016,0.00012755602],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013208357,0.000012637432,0.00037101752,0.000016867409,0.000009888932,0.000016461863,0.000006782649,0.9864168,0.0030143457,0.0010088689,0.00007325869,0.0090398],"study_design_scores_gemma":[0.0000021671365,0.000010904205,0.00012453759,0.0000010728452,0.0000019763586,0.000004030929,0.0000021984401,0.99871624,0.0008730567,0.00018326748,0.00007924301,0.0000012608264],"about_ca_topic_score_codex":0.00461913,"about_ca_topic_score_gemma":0.005149639,"teacher_disagreement_score":0.00461913,"about_ca_system_score_codex":0.00048323028,"about_ca_system_score_gemma":0.00073591154,"threshold_uncertainty_score":0.00918448},"labels":[],"label_agreement":null},{"id":"W4409787563","doi":"10.61091/jcmcc127a-406","title":"Intelligent Estimation of Construction Project Costs Based on Subtractive Clustering-based Self-Learning Convolutional Neural Network","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Convolutional neural network; Cluster analysis; Artificial intelligence; Estimation; Artificial neural network; Machine learning; Engineering; Systems engineering","score_opus":0.007968778674266588,"score_gpt":0.23875892288614595,"score_spread":0.23079014421187935,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787563","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.115611084,0.00021940026,0.88025457,0.00013930417,0.000027904227,0.000040788484,0.00006499719,0.0006763568,0.002965568],"genre_scores_gemma":[0.94298756,0.0001537733,0.054098256,0.000056352397,0.000013717395,0.00006270248,0.00013014454,0.000035368095,0.0024621042],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999637,0.000036933303,0.000022461209,0.000118253985,0.00014349537,0.00004192938],"domain_scores_gemma":[0.99963665,0.0000747754,0.00007142799,0.000032192325,0.00017129764,0.000013690689],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045793012,0.0008081836,0.0006565899,0.0010145502,0.0003280293,0.00071736804,0.0012009975,0.00051428017,0.000574474],"category_scores_gemma":[0.0010607768,0.00050644664,0.0006249254,0.0008608211,0.00035055756,0.0010339889,0.0006093099,0.00042243057,0.00016445525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000054664135,0.00006535082,0.0036168143,0.000034624874,0.000067241235,0.00004971415,0.000044272416,0.8983521,0.004329094,0.0013995613,0.0005026159,0.091484],"study_design_scores_gemma":[8.563607e-7,0.0000048262964,0.0005045787,0.0000012991412,0.0000049525897,0.000007546895,0.0000023608463,0.9984841,0.00069356227,0.00023236132,0.00006015656,0.0000034796808],"about_ca_topic_score_codex":0.01676002,"about_ca_topic_score_gemma":0.019661248,"teacher_disagreement_score":0.01676002,"about_ca_system_score_codex":0.00128762,"about_ca_system_score_gemma":0.0008960932,"threshold_uncertainty_score":0.033324957},"labels":[],"label_agreement":null},{"id":"W4409787762","doi":"10.61091/jcmcc127a-518","title":"Research on Civil Engineering Project Management Efficiency Improvement Based on BIM Technology","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Engineering; Engineering management; Construction engineering; Project management; Systems engineering","score_opus":0.011632025372123198,"score_gpt":0.2684301973533815,"score_spread":0.25679817198125826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409787762","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034016207,0.004149613,0.9341142,0.0006456799,0.000105230494,0.000120534074,0.000062075036,0.0004806144,0.026305811],"genre_scores_gemma":[0.6829832,0.009575842,0.29600677,0.00016593521,0.00010443827,0.00023073883,0.00024737246,0.00016753326,0.010518194],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99651897,0.00090950954,0.00015037402,0.0003947142,0.0018185403,0.00020790518],"domain_scores_gemma":[0.99874496,0.00044382497,0.00016923777,0.00017794689,0.0004118304,0.000052257245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002280488,0.0008513214,0.0006723118,0.0033134585,0.0005767876,0.0021238592,0.001191616,0.00052717736,0.0024649044],"category_scores_gemma":[0.004361593,0.0004451291,0.0009951455,0.004356603,0.0007823309,0.0039533637,0.0011548701,0.000853142,0.00045011195],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008392308,0.00019363512,0.0055333404,0.00056528574,0.00010167843,0.0001000675,0.00040572937,0.15637708,0.00741403,0.13933438,0.0031461886,0.6867447],"study_design_scores_gemma":[0.000043086704,0.0003918066,0.010062344,0.00026856712,0.00017151421,0.00051424926,0.00073081854,0.82646173,0.026169943,0.06777576,0.067305215,0.00010504559],"about_ca_topic_score_codex":0.0027510854,"about_ca_topic_score_gemma":0.0019490098,"teacher_disagreement_score":0.0033134585,"about_ca_system_score_codex":0.0016693933,"about_ca_system_score_gemma":0.002152823,"threshold_uncertainty_score":0.0121123195},"labels":[],"label_agreement":null},{"id":"W4409795131","doi":"10.61091/jcmcc127b-412","title":"Green Building Performance Prediction and Evaluation System under BIM – based Digital Construction Technology","year":2025,"lang":"en","type":"article","venue":"Journal of Combinatorial Mathematics and Combinatorial Computing","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Green building; Building information modeling; Architectural engineering; Construction engineering; Computer science; Systems engineering; Engineering; Operations management","score_opus":0.007209567207767159,"score_gpt":0.21998470863231998,"score_spread":0.2127751414245528,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409795131","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20959774,0.0002301954,0.7539167,0.00036355102,0.000120736375,0.00040612317,0.002393707,0.020502608,0.012468652],"genre_scores_gemma":[0.8898601,0.00029428359,0.10249239,0.00011291057,0.000040261388,0.0004257094,0.0032960211,0.00018864509,0.0032896323],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989371,0.00013751151,0.000068722155,0.00019753634,0.0005640047,0.00009524943],"domain_scores_gemma":[0.9994086,0.00006568848,0.000087742104,0.00013783158,0.00024054144,0.000059665224],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009649507,0.0010916246,0.00086427096,0.0024917924,0.00057299837,0.0015192355,0.00082776084,0.0005955396,0.0021470871],"category_scores_gemma":[0.00127249,0.00039409386,0.0007049211,0.0017663959,0.00034306687,0.0017492058,0.0014536497,0.0004247461,0.00089723634],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000717644,0.00094843446,0.03992714,0.00026321053,0.00018262376,0.0004178737,0.00042627568,0.4524513,0.039910134,0.008447261,0.011617236,0.4446908],"study_design_scores_gemma":[0.000028294116,0.00009043313,0.006677374,0.000012583728,0.00003906204,0.00006288799,0.000067011424,0.97344244,0.014649881,0.0016774576,0.0032095362,0.000043006825],"about_ca_topic_score_codex":0.0060021393,"about_ca_topic_score_gemma":0.0035533581,"teacher_disagreement_score":0.0060021393,"about_ca_system_score_codex":0.0012232763,"about_ca_system_score_gemma":0.0012670006,"threshold_uncertainty_score":0.0119344},"labels":[],"label_agreement":null},{"id":"W4409799836","doi":"10.11159/icsect25.139","title":"A Systematic Framework for the Seismic Risk Management of RC Bridges Using Hybrid Retrofit Strategies","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"United Arab Emirates University","keywords":"Computer science; Risk management; Construction engineering; Engineering; Business","score_opus":0.004962685979116521,"score_gpt":0.19800204617982986,"score_spread":0.19303936020071333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799836","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029288628,0.00025396567,0.99286485,0.00015696647,0.00001036891,0.00036025903,0.000052120187,0.00015813725,0.0032144575],"genre_scores_gemma":[0.09340684,0.00070772483,0.9033809,0.0000616065,0.000035680314,0.0008846797,0.00018804832,0.000045982295,0.0012885511],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99757844,0.00085498404,0.00021830213,0.00029988243,0.0008727514,0.00017561823],"domain_scores_gemma":[0.9982742,0.00056031544,0.00034321842,0.00015135414,0.00058477087,0.000086122935],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004072444,0.0022383002,0.0012221052,0.0034710963,0.00093224423,0.0031882825,0.002622254,0.0012485351,0.0026305052],"category_scores_gemma":[0.003785028,0.00080625224,0.0017091101,0.0013904017,0.0016496471,0.0019116548,0.0023475664,0.0013371852,0.00050716987],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026894268,0.0002547973,0.0018000279,0.00044906553,0.00011195243,0.00034537257,0.00034253375,0.7328128,0.005768363,0.12526664,0.0016357796,0.13118567],"study_design_scores_gemma":[0.000025196894,0.00017626061,0.0005495101,0.00025989654,0.000058120982,0.00012013638,0.0002476405,0.9516578,0.00203375,0.038494363,0.0063347737,0.000042634372],"about_ca_topic_score_codex":0.006228885,"about_ca_topic_score_gemma":0.010644146,"teacher_disagreement_score":0.006228885,"about_ca_system_score_codex":0.0020469723,"about_ca_system_score_gemma":0.007373458,"threshold_uncertainty_score":0.021537364},"labels":[],"label_agreement":null},{"id":"W4409799975","doi":"10.11159/icsect25.134","title":"Towards A Multidisciplinary Framework to Improve the Quality of Structural Masonry in Developing Countries: Case Study of South Africa","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Multidisciplinary approach; Masonry; Quality (philosophy); Developing country; Computer science; Environmental planning; Engineering; Civil engineering; Geography; Economic growth; Economics; Sociology; Social science","score_opus":0.00935155598394076,"score_gpt":0.23872846358188118,"score_spread":0.22937690759794044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799975","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9729927,0.00044581844,0.004977042,0.001555273,0.000009899463,0.00025892927,0.000030028112,0.00000460043,0.019725835],"genre_scores_gemma":[0.9931552,0.00042795818,0.0051771267,0.000059555296,0.0000017148055,0.0000569188,0.000009205434,0.0000029214368,0.001109494],"study_design_codex":"qualitative","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9975781,0.0017957977,0.00006212577,0.00006761134,0.00017122144,0.00032517107],"domain_scores_gemma":[0.99878687,0.00078109355,0.00013121242,0.000051765397,0.00012228897,0.0001268056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003925192,0.00040862898,0.0002712252,0.0017021706,0.005362098,0.0027318501,0.0008811866,0.0013000396,0.0015283222],"category_scores_gemma":[0.0025816038,0.00025872694,0.0002758077,0.0024072807,0.0033360762,0.0017031141,0.0030388678,0.00097328686,0.00010219669],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021759012,0.00091231347,0.052444197,0.0012162863,0.00004593768,0.042297546,0.644904,0.00790253,0.0106239505,0.14387141,0.0028975075,0.0926667],"study_design_scores_gemma":[0.000027353217,0.00015627118,0.021887247,0.0006117054,0.000024006116,0.0019989333,0.93251806,0.003038932,0.0023111107,0.0047967494,0.032600373,0.000029228357],"about_ca_topic_score_codex":0.016184738,"about_ca_topic_score_gemma":0.047129106,"teacher_disagreement_score":0.016184738,"about_ca_system_score_codex":0.0050651166,"about_ca_system_score_gemma":0.0033994187,"threshold_uncertainty_score":0.036750138},"labels":[],"label_agreement":null},{"id":"W4409799976","doi":"10.11159/icsect25.111","title":"Social Housing: Critical Evaluation of Prestress Losses in Precast Slabs","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Structural engineering; Computer science; Engineering; Geotechnical engineering","score_opus":0.009556308984183666,"score_gpt":0.23382103467522888,"score_spread":0.22426472569104522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799976","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9580181,0.00026235165,0.035377562,0.000038236263,0.00001852331,0.00009492065,0.00036928031,0.00013427292,0.0056866934],"genre_scores_gemma":[0.9940904,0.00005795132,0.004656995,0.0000030376425,0.0000026813645,0.000016648743,0.00015808592,0.000025859586,0.0009882952],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9993026,0.0001256248,0.000022074024,0.000046149737,0.0004212813,0.000082366656],"domain_scores_gemma":[0.99874616,0.000409396,0.00011482567,0.000080942715,0.0005773731,0.00007134898],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011468842,0.000892301,0.00036515878,0.001784371,0.00041440222,0.00061094156,0.0006140762,0.000562962,0.003081015],"category_scores_gemma":[0.0022667581,0.00022426022,0.00030690862,0.0006794604,0.0005048718,0.00071822247,0.00049821974,0.00031335285,0.0003012033],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0022620766,0.0004952467,0.05475907,0.00060487224,0.00014554973,0.0013500085,0.001050678,0.66349006,0.13499165,0.0061877067,0.001659342,0.1330037],"study_design_scores_gemma":[0.000024972655,0.0013188475,0.084412806,0.00006854313,0.000095814554,0.0006335151,0.001168569,0.8113025,0.09658334,0.0018389168,0.0024796391,0.00007258374],"about_ca_topic_score_codex":0.006717687,"about_ca_topic_score_gemma":0.0073331497,"teacher_disagreement_score":0.006717687,"about_ca_system_score_codex":0.0008430552,"about_ca_system_score_gemma":0.00051831856,"threshold_uncertainty_score":0.0133571625},"labels":[],"label_agreement":null},{"id":"W4409799991","doi":"10.11159/icsect25.162","title":"Impact of Errors and Omissions in Concrete Slab Penetrations in Construction Projects","year":2025,"lang":"en","type":"article","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Slab; Computer science; Engineering; Construction engineering; Structural engineering","score_opus":0.0046064211687044665,"score_gpt":0.20419453885986966,"score_spread":0.1995881176911652,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409799991","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9950251,0.00012845412,0.0019375705,0.00023305445,0.000013391687,0.000019826977,0.00013069107,0.000024738289,0.002487133],"genre_scores_gemma":[0.9981956,0.00012045014,0.0011956757,0.000023418967,0.0000060130146,0.0000112125435,0.00008694044,0.000011521674,0.00034912935],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.95804965,0.015744371,0.00506718,0.002037956,0.017225603,0.001875234],"domain_scores_gemma":[0.7886585,0.11227942,0.06917115,0.007816707,0.01955118,0.0025230173],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011956112,0.00046249776,0.000376331,0.0024025375,0.0010352505,0.0018483335,0.00098499,0.0008675643,0.0019808768],"category_scores_gemma":[0.11456124,0.0005343487,0.00047080644,0.0025676065,0.0019436226,0.0028659457,0.004159466,0.0013121926,0.0003067887],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035496295,0.00023263815,0.90253395,0.00029581797,0.000110690264,0.0009895775,0.01750135,0.011224586,0.0014331961,0.0010638686,0.00057832024,0.06368109],"study_design_scores_gemma":[0.000006974847,0.00039760096,0.9502775,0.00048028055,0.00009752249,0.0007985964,0.03668474,0.005517027,0.0020932215,0.0010294658,0.002539016,0.00007810761],"about_ca_topic_score_codex":0.00843423,"about_ca_topic_score_gemma":0.013882162,"teacher_disagreement_score":0.011956112,"about_ca_system_score_codex":0.0022664864,"about_ca_system_score_gemma":0.00271756,"threshold_uncertainty_score":0.06323069},"labels":[],"label_agreement":null},{"id":"W4409800006","doi":"10.11159/csee25","title":"Proceedings of the 10th World Congress on Civil, Structural, and Environmental Engineering","year":2025,"lang":"en","type":"paratext","venue":"Proceedings of the World Congress on Civil, Structural, and Environmental Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"New Jersey Department of Transportation; U.S. Department of Transportation","keywords":"Computer science; Engineering; Political science","score_opus":0.004222973071937359,"score_gpt":0.18015953047383604,"score_spread":0.17593655740189867,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409800006","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023838761,0.01492632,0.0045248596,0.01699748,0.07086706,0.00027750453,0.0030696923,0.0004789666,0.8864743],"genre_scores_gemma":[0.004260211,0.0048363176,0.0011121958,0.0009594455,0.0030731433,0.00011338843,0.0020465865,0.00020863679,0.98339003],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989429,0.00016828142,0.000044503857,0.00011873219,0.0006010984,0.00012445769],"domain_scores_gemma":[0.99869615,0.00017611773,0.000054696317,0.00008734005,0.0006436144,0.00034220918],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017307947,0.001266211,0.0007126266,0.0013854086,0.0013149625,0.0063631725,0.0008728843,0.0016428541,0.2715634],"category_scores_gemma":[0.0018197325,0.00018316772,0.0004109322,0.0011885976,0.0007663245,0.0028932628,0.002276048,0.0026998317,0.123288214],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003095464,0.000035291585,0.00009978967,0.00010906784,0.000003247521,0.000033555665,0.00004030214,0.00010499379,0.00028715003,0.003586915,0.95218176,0.043487024],"study_design_scores_gemma":[0.000001853318,0.0000075679473,0.00025855043,0.000063018524,0.0000010762989,0.000020398158,0.0000431081,0.00007033269,0.0000896295,0.00051017705,0.9989317,0.0000026441282],"about_ca_topic_score_codex":0.0025808648,"about_ca_topic_score_gemma":0.007841504,"teacher_disagreement_score":0.2715634,"about_ca_system_score_codex":0.0016089824,"about_ca_system_score_gemma":0.002936194,"threshold_uncertainty_score":0.9084701},"labels":[],"label_agreement":null},{"id":"W4409839744","doi":"10.1016/j.engstruct.2025.120438","title":"Performance-based seismic design method of stacked modular steel building based on three-dimensional seismic isolation","year":2025,"lang":"en","type":"article","venue":"Engineering Structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"China Scholarship Council; National Natural Science Foundation of China","keywords":"Seismic isolation; Structural engineering; Seismic analysis; Modular design; Modular construction; Seismic retrofit; Computer science; Geology; Engineering; Seismology; Reinforced concrete","score_opus":0.007498042350918382,"score_gpt":0.21600015858787688,"score_spread":0.2085021162369585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409839744","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017761989,0.000052992316,0.97613573,0.00003082751,0.000018394296,0.000025074494,0.000028044578,0.00028110304,0.005665804],"genre_scores_gemma":[0.71180105,0.00018955777,0.28182527,0.000045793953,0.000026845299,0.00015068222,0.00018550109,0.00017600883,0.0055993167],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9997162,0.000044207474,0.000012017128,0.000045175442,0.00015455844,0.000027711489],"domain_scores_gemma":[0.999858,0.000026009895,0.000020198133,0.000015334808,0.00006704085,0.000013487515],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000284336,0.00091455836,0.00066107535,0.0006493249,0.00034908782,0.00065093406,0.0010665181,0.000547347,0.0032297862],"category_scores_gemma":[0.0003907776,0.00050270004,0.0007788526,0.00042862442,0.00030634907,0.00055793644,0.0007980307,0.00038185317,0.0007047753],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006422081,0.00006811742,0.0009858593,0.00014796665,0.000043709297,0.00013273022,0.0001356815,0.87529266,0.047890294,0.009349186,0.000984968,0.06490472],"study_design_scores_gemma":[0.0000040856976,0.0000415813,0.00019518757,0.0000045993547,0.000015748126,0.000049805472,0.000022875942,0.9943514,0.0034892166,0.00085761317,0.00096114096,0.0000068381073],"about_ca_topic_score_codex":0.0015995427,"about_ca_topic_score_gemma":0.0024181332,"teacher_disagreement_score":0.0032297862,"about_ca_system_score_codex":0.0003739724,"about_ca_system_score_gemma":0.0008652848,"threshold_uncertainty_score":0.010804772},"labels":[],"label_agreement":null},{"id":"W4409875585","doi":"10.1016/j.resconrec.2025.108331","title":"Assembly restoration framework for modelling circular building strategies","year":2025,"lang":"en","type":"article","venue":"Resources Conservation and Recycling","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Circular economy; Engineering; Environmental science; Construction engineering; Architectural engineering; Waste management; Business; Environmental resource management; Civil engineering; Environmental planning; Ecology; Biology","score_opus":0.020633865811075174,"score_gpt":0.25936012135992653,"score_spread":0.23872625554885135,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409875585","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011611186,0.00026389663,0.94620234,0.0002825754,0.000043147862,0.00009735881,0.00022710898,0.00026425798,0.0410081],"genre_scores_gemma":[0.48882377,0.00084296754,0.48285055,0.00011069974,0.00004056767,0.00067718106,0.0005306432,0.0004079792,0.025715558],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99952435,0.00018265123,0.000030154863,0.00007914838,0.00010582592,0.000077914614],"domain_scores_gemma":[0.99942493,0.00024127115,0.00010498953,0.00006914011,0.00011619874,0.000043518132],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001200512,0.0008694026,0.0005728353,0.0015053806,0.00090926257,0.0021376386,0.0019743417,0.001907083,0.009313466],"category_scores_gemma":[0.0020164866,0.00070611143,0.0013902163,0.0012634908,0.0017753848,0.0020349815,0.0016812899,0.0011825653,0.0013143534],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000009231531,0.000018843552,0.00023977528,0.0000297737,0.000006586408,0.000075689066,0.00011853765,0.79541457,0.00028783956,0.19779202,0.000527258,0.00547984],"study_design_scores_gemma":[0.0000063816337,0.000013344516,0.00009770951,0.000020453153,0.0000070968845,0.00004970844,0.00010577317,0.9493029,0.0001593459,0.038111653,0.012115141,0.000010572834],"about_ca_topic_score_codex":0.02169904,"about_ca_topic_score_gemma":0.014640846,"teacher_disagreement_score":0.02169904,"about_ca_system_score_codex":0.0022538002,"about_ca_system_score_gemma":0.0018108772,"threshold_uncertainty_score":0.043145478},"labels":[],"label_agreement":null},{"id":"W4409950976","doi":"10.1016/b978-0-443-29861-5.00027-5","title":"Robotic construction and inspection: automation and efficiency in the building process","year":2025,"lang":"en","type":"book-chapter","venue":"Elsevier eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Automation; Process (computing); Process automation system; Computer science; Manufacturing engineering; Engineering; Architectural engineering; Construction engineering; Mechanical engineering; Operating system","score_opus":0.0060905111345767255,"score_gpt":0.21188692504882006,"score_spread":0.20579641391424333,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409950976","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0059594796,0.07489844,0.3021889,0.0020270722,0.00082859356,0.000047808164,0.00023536738,0.0012311653,0.6125831],"genre_scores_gemma":[0.09478457,0.07420822,0.16091612,0.00045961203,0.00051359873,0.00012195445,0.0005147945,0.00073549,0.66774577],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994635,0.000060854058,0.000018495619,0.000081082086,0.00034895013,0.00002718112],"domain_scores_gemma":[0.9997278,0.00014629994,0.000017758253,0.000043865628,0.000051422314,0.000012912456],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004075201,0.00080834463,0.00070089684,0.00093551865,0.00037661457,0.0037558936,0.0009711004,0.0013222377,0.031343635],"category_scores_gemma":[0.00063603424,0.0007643091,0.0003990489,0.0016836574,0.0014511815,0.0031930096,0.0014001335,0.0010652706,0.009809067],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000040675553,0.000061854465,0.00027400508,0.00056436774,0.000018552324,0.00008648444,0.00025041483,0.011065486,0.0062542213,0.25780952,0.042104885,0.6814695],"study_design_scores_gemma":[0.000007982824,0.0000667717,0.0014925989,0.00048580393,0.000019214594,0.00068650476,0.0002626225,0.017911322,0.004756824,0.15091707,0.8233609,0.000032284563],"about_ca_topic_score_codex":0.0014465813,"about_ca_topic_score_gemma":0.0021897075,"teacher_disagreement_score":0.031343635,"about_ca_system_score_codex":0.00078516785,"about_ca_system_score_gemma":0.000750107,"threshold_uncertainty_score":0.10485494},"labels":[],"label_agreement":null},{"id":"W4409978586","doi":"10.1016/j.autcon.2025.106198","title":"Simulation as a decision-support tool in construction project management: Simphony-Dynamic-as-a-Service","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Decision support system; Service (business); Construction management; Engineering; Engineering management; Process management; Project management; Computer science; Construction engineering; Systems engineering; Operations research; Operations management; Business; Civil engineering; Artificial intelligence","score_opus":0.005636206337668867,"score_gpt":0.2614255933201834,"score_spread":0.2557893869825145,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4409978586","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13157791,0.00041285172,0.82680166,0.00092902634,0.00024189828,0.00020093394,0.0003697091,0.0066103823,0.032855608],"genre_scores_gemma":[0.8725062,0.00033895482,0.12149283,0.00015136953,0.00003783188,0.00016177393,0.00025512264,0.00031236227,0.0047435276],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990571,0.00055404665,0.00004736471,0.00008693096,0.00019435034,0.000060174723],"domain_scores_gemma":[0.99851924,0.0009577764,0.00005537296,0.00015875054,0.00018124575,0.00012764178],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0014363616,0.0005517953,0.000567469,0.00059781177,0.00051963615,0.0018526124,0.0009325906,0.0009527634,0.007870758],"category_scores_gemma":[0.0023402448,0.00031562854,0.00039517132,0.000633044,0.0006629457,0.0013488819,0.0013830193,0.0007463966,0.000900137],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014602933,0.0008290978,0.004747255,0.00025434745,0.000113925795,0.00036437588,0.0011472175,0.6669462,0.011747669,0.05594788,0.006852714,0.2495891],"study_design_scores_gemma":[0.00007088276,0.00012197658,0.00039456316,0.000039032897,0.000023407578,0.000057304536,0.000122033365,0.97847056,0.0038030704,0.008362579,0.008508551,0.00002605518],"about_ca_topic_score_codex":0.005027066,"about_ca_topic_score_gemma":0.002947502,"teacher_disagreement_score":0.007870758,"about_ca_system_score_codex":0.0006971891,"about_ca_system_score_gemma":0.0012005233,"threshold_uncertainty_score":0.026330352},"labels":[],"label_agreement":null},{"id":"W4410106010","doi":"10.1016/j.aei.2025.103367","title":"Integrated fuzzy system dynamics–fuzzy agent-based modeling of construction crew motivation and productivity","year":2025,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Canada First Research Excellence Fund; University of Alberta","keywords":"Crew; Productivity; Fuzzy logic; Computer science; Engineering; Artificial intelligence; Aeronautics; Economics","score_opus":0.004842735871657765,"score_gpt":0.18137791623529667,"score_spread":0.1765351803636389,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410106010","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.35316914,0.00021032292,0.6218404,0.00051670376,0.000066726956,0.00007422493,0.00024211034,0.00017896289,0.0237014],"genre_scores_gemma":[0.9854908,0.00007700111,0.010549656,0.000010496451,0.0000067255937,0.000043236447,0.000044067812,0.000009627484,0.003768425],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998191,0.00006084472,0.000007655966,0.00003687759,0.000044746404,0.000030856252],"domain_scores_gemma":[0.9996736,0.00015721162,0.000048420035,0.000014736186,0.00007839301,0.000027655076],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004985411,0.00036115857,0.0004578378,0.0005580258,0.00040938324,0.0012253929,0.00075286365,0.0007824115,0.0032098836],"category_scores_gemma":[0.0013324954,0.00030996444,0.00046153678,0.0005904495,0.00046754838,0.0007930906,0.00057933864,0.0004929956,0.00031299336],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027773754,0.000048211587,0.0013882892,0.0000150087435,0.00002240305,0.000042480893,0.00008722143,0.98119223,0.00069649034,0.011757025,0.00016599332,0.0045569087],"study_design_scores_gemma":[0.0000024660505,0.0000056983877,0.00026248195,0.0000014026684,0.0000024889312,0.000002998767,0.000011654138,0.99831605,0.0000630844,0.0012049179,0.00012448638,0.000002243237],"about_ca_topic_score_codex":0.02063053,"about_ca_topic_score_gemma":0.011079597,"teacher_disagreement_score":0.02063053,"about_ca_system_score_codex":0.0009716867,"about_ca_system_score_gemma":0.0010854185,"threshold_uncertainty_score":0.04102093},"labels":[],"label_agreement":null},{"id":"W4410425913","doi":"10.70803/001c.138281","title":"Development of Self-Reinforced Concrete Block for Improved Shear Wall Ductility","year":2017,"lang":"en","type":"article","venue":"The Masonry Society Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Shear wall; Ductility (Earth science); Reinforced concrete; Materials science; Block (permutation group theory); Structural engineering; Shear (geology); Composite material; Engineering; Geometry; Mathematics; Creep","score_opus":0.014075215373346469,"score_gpt":0.2279919645266933,"score_spread":0.21391674915334682,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410425913","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9017353,0.00075750466,0.08936621,0.00009318653,0.000071506045,0.00010093534,0.00010768453,0.00059068954,0.007177029],"genre_scores_gemma":[0.89273155,0.0005630931,0.09850404,0.000032655924,0.000018437704,0.00006112041,0.00025280417,0.000082148195,0.007754254],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999859,0.000009494206,0.000007801547,0.000015897422,0.00009008634,0.000017796612],"domain_scores_gemma":[0.9998011,0.000011794759,0.000063794956,0.000017183645,0.00006408001,0.00004210754],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00018813687,0.00022865881,0.00016391203,0.0002802417,0.000110072775,0.00014767602,0.0003199467,0.00020187828,0.0008372639],"category_scores_gemma":[0.00013933734,0.00016397642,0.00021425373,0.00008581044,0.00013448195,0.0002448913,0.00024191086,0.00029950152,0.0005446089],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000016637048,0.000024035478,0.00037218447,0.00004876665,0.0000040124664,0.00009308171,0.000021681304,0.0016219052,0.99001676,0.00051726616,0.00007695102,0.007186736],"study_design_scores_gemma":[0.000020550924,0.0009206237,0.003191616,0.000013219061,0.000017436187,0.00047583992,0.000013288947,0.011046816,0.9689059,0.00009415429,0.015285695,0.000014879125],"about_ca_topic_score_codex":0.0003518466,"about_ca_topic_score_gemma":0.001299011,"teacher_disagreement_score":0.0008372639,"about_ca_system_score_codex":0.00013829376,"about_ca_system_score_gemma":0.00031527007,"threshold_uncertainty_score":0.0028009415},"labels":[],"label_agreement":null},{"id":"W4410505931","doi":"10.3390/buildings15101709","title":"Efficiency of Modular Bridge Configurations: A Study on the Structural Stability and Capacity of Single- and Double-Story Modular Bridges","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Western University","funders":"Ontario Ministry of Economic Development, Job Creation and Trade; Ministero dello Sviluppo Economico; Ontario Centre of Innovation","keywords":"Modular design; Bridge (graph theory); Structural engineering; Modular construction; Engineering; Computer science; Programming language; Medicine","score_opus":0.02508002053685749,"score_gpt":0.2282832931495231,"score_spread":0.2032032726126656,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410505931","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9974343,0.000073416115,0.0017669735,0.0000062509657,0.0000047604476,0.0000072627286,0.000050570547,0.000024847475,0.0006316112],"genre_scores_gemma":[0.9985092,0.000040189196,0.0010534737,0.0000037265697,0.0000025964716,0.000007036965,0.000100440746,0.000010097652,0.00027320755],"study_design_codex":"bench_or_experimental","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960107,0.000055857487,0.000028759086,0.000086787055,0.00016355248,0.00006395285],"domain_scores_gemma":[0.9989491,0.00023388631,0.00020566906,0.00018564444,0.00033135185,0.00009431764],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085029786,0.0006194002,0.00039155025,0.0013430357,0.0002977006,0.00037425576,0.0007679321,0.00050002075,0.002151239],"category_scores_gemma":[0.0015639911,0.0002118098,0.00032215257,0.00045165018,0.000444241,0.000893518,0.0006969078,0.00018854326,0.00051286345],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007937506,0.00039104643,0.051195536,0.00047579338,0.00012629316,0.0007730686,0.00050013216,0.06480502,0.7737085,0.0008892896,0.00045556814,0.105885945],"study_design_scores_gemma":[0.00010260198,0.010099304,0.24510756,0.0001247406,0.00026382113,0.0024624253,0.0011493118,0.22132725,0.51377356,0.0008594606,0.004601476,0.00012844196],"about_ca_topic_score_codex":0.000297466,"about_ca_topic_score_gemma":0.00075502234,"teacher_disagreement_score":0.002151239,"about_ca_system_score_codex":0.00021647841,"about_ca_system_score_gemma":0.0001475613,"threshold_uncertainty_score":0.007196665},"labels":[],"label_agreement":null},{"id":"W4410777652","doi":"10.3390/buildings15111840","title":"A Novel Framework for Natural Language Interaction with 4D BIM","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Natural (archaeology); Human–computer interaction; Building information modeling; Computer science; Systems engineering; Engineering; Architectural engineering; Geography; Operations management","score_opus":0.005064747679159862,"score_gpt":0.24341659454646988,"score_spread":0.23835184686731004,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410777652","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0007488898,0.000113294176,0.99007505,0.00021821579,0.00006684267,0.00013005367,0.0001275989,0.0013443115,0.0071756467],"genre_scores_gemma":[0.049522407,0.00031677083,0.9416534,0.0002811702,0.000115876814,0.00076847686,0.0004917647,0.00043610836,0.006413986],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99705136,0.0012398679,0.0002334649,0.0005426521,0.00077643717,0.0001563292],"domain_scores_gemma":[0.9981092,0.0010605819,0.00013154173,0.00031888112,0.0002886896,0.000091082584],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030645716,0.0012644371,0.0006591141,0.0018576017,0.001252066,0.0047958586,0.0029769086,0.002048124,0.014133232],"category_scores_gemma":[0.004895272,0.0008242151,0.0019825057,0.0011406683,0.0033003185,0.0051187756,0.0048876433,0.0019285978,0.003896956],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000099264435,0.000117580654,0.00042971128,0.0006742717,0.000049158156,0.0007573164,0.0042448128,0.015741462,0.014422141,0.83794093,0.009445259,0.11607826],"study_design_scores_gemma":[0.00005858451,0.00013947718,0.00052502076,0.00034536808,0.00005851935,0.0011741981,0.0011287761,0.22468784,0.00884428,0.4159569,0.34695154,0.00012944944],"about_ca_topic_score_codex":0.004381887,"about_ca_topic_score_gemma":0.0044031427,"teacher_disagreement_score":0.014133232,"about_ca_system_score_codex":0.0011380705,"about_ca_system_score_gemma":0.0014900381,"threshold_uncertainty_score":0.04728043},"labels":[],"label_agreement":null},{"id":"W4410873454","doi":"10.1080/13467581.2025.2507235","title":"Drivers for adopting augmented reality and virtual reality technologies in the construction project management in Gaza City","year":2025,"lang":"en","type":"article","venue":"Journal of Asian Architecture and Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Augmented reality; Virtual reality; Artificial reality; Architectural engineering; Engineering; Mixed reality; Computer-mediated reality; Computer science; Human–computer interaction","score_opus":0.008672896215308338,"score_gpt":0.24038732921379338,"score_spread":0.23171443299848504,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410873454","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9948931,0.00038857723,0.00048451315,0.00078569615,0.0000058137584,0.00002646057,0.000025053034,0.0000074984628,0.0033833892],"genre_scores_gemma":[0.9984945,0.00041959394,0.0005209215,0.000037751644,0.0000024893118,0.000015084659,0.000011775605,0.0000019801964,0.0004958547],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9976369,0.0010350237,0.00015753302,0.00016164636,0.00056829397,0.00044058493],"domain_scores_gemma":[0.99636865,0.0016069555,0.0011296382,0.00008307546,0.00043354757,0.0003780892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0021693192,0.00029593622,0.00018273894,0.0016104731,0.0015972462,0.004417728,0.00047524413,0.00078086887,0.0019185661],"category_scores_gemma":[0.00427232,0.0004908202,0.00024356077,0.0020829658,0.0013735482,0.001571844,0.0017245092,0.00079671206,0.00024547993],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019289993,0.00029694164,0.7757069,0.00083023997,0.00006826857,0.003580316,0.122596234,0.0009758019,0.0055278144,0.0070574237,0.0014226352,0.08174448],"study_design_scores_gemma":[0.000010211726,0.00023567361,0.5482988,0.00041457027,0.000053563508,0.0013973785,0.423749,0.0016082792,0.00087908097,0.0008003925,0.022465495,0.000087636676],"about_ca_topic_score_codex":0.010017891,"about_ca_topic_score_gemma":0.013744279,"teacher_disagreement_score":0.010017891,"about_ca_system_score_codex":0.0024263507,"about_ca_system_score_gemma":0.0030679724,"threshold_uncertainty_score":0.019919157},"labels":[],"label_agreement":null},{"id":"W4410894318","doi":"10.61552/jemit.2025.02.006","title":"CANADIAN BUILDING MAINTENANCE CODES AND STANDARDS WITH EXAMPLE CITY OF CALGARY","year":2025,"lang":"en","type":"article","venue":"Journal of Engineering Management and Information Technology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Computer science; Engineering","score_opus":0.0019920743378795706,"score_gpt":0.16634625018524712,"score_spread":0.16435417584736756,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410894318","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19454831,0.0034600825,0.006805046,0.0035974842,0.00038798546,0.00040791417,0.05569194,0.0006997639,0.73440146],"genre_scores_gemma":[0.81336737,0.0035756687,0.026536863,0.0005504676,0.00006100874,0.0002024798,0.027186286,0.00023513373,0.12828475],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9987564,0.00008552009,0.000043282682,0.000110625646,0.00072198577,0.00028217933],"domain_scores_gemma":[0.99794203,0.00015314775,0.000119899625,0.00007825842,0.0015480944,0.00015857135],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00045083291,0.00035694477,0.00020193122,0.0059149596,0.003444403,0.002321808,0.00093839533,0.0004031997,0.010740253],"category_scores_gemma":[0.0021457206,0.0001486972,0.0002599276,0.012832976,0.00095577876,0.00039690427,0.0009073997,0.0006265127,0.00094593037],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001810706,0.000091118636,0.09234674,0.00065815606,0.000032438238,0.0012322139,0.009799387,0.01041709,0.0018794762,0.21329053,0.32159436,0.3484775],"study_design_scores_gemma":[0.000017679338,0.000027022199,0.3385584,0.00023146685,0.00002402831,0.00029121336,0.010584362,0.0024971378,0.00068776973,0.0031325468,0.64386994,0.00007836474],"about_ca_topic_score_codex":0.9935947,"about_ca_topic_score_gemma":0.99699473,"teacher_disagreement_score":0.049157012,"about_ca_system_score_codex":0.049157012,"about_ca_system_score_gemma":0.041044272,"threshold_uncertainty_score":0.35666072},"labels":[],"label_agreement":null},{"id":"W4410898050","doi":"10.1007/978-3-031-93835-1_11","title":"An Interactive Multi-modal Online Platform for Supporting Data-Informed Design Discourse on Developing Built Environments","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in computer science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Simon Fraser University","funders":"","keywords":"Computer science; Modal; Human–computer interaction; Multimedia","score_opus":0.05048053514571442,"score_gpt":0.32552666475675235,"score_spread":0.2750461296110379,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4410898050","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03350797,0.00023407298,0.7852887,0.0008600801,0.00018836369,0.00054358115,0.0061445646,0.07196308,0.101269655],"genre_scores_gemma":[0.21818255,0.00041426008,0.66358596,0.0005046502,0.00010823267,0.0021209822,0.0145815695,0.009720808,0.09078103],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99930906,0.0002636841,0.000039294155,0.00011188666,0.00021967579,0.00005641999],"domain_scores_gemma":[0.9968732,0.002279789,0.00006820455,0.0004109798,0.00014627716,0.00022159873],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017348315,0.0010452465,0.00045502218,0.0013237182,0.0009312259,0.0038547723,0.0019332764,0.0014212676,0.06751102],"category_scores_gemma":[0.0035965506,0.00057831965,0.00048564374,0.0009821207,0.0007038051,0.0064265067,0.008853985,0.0010852163,0.012858098],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014604395,0.0011284553,0.0018931549,0.0013897422,0.0000897564,0.0018874835,0.02954403,0.008826666,0.06583339,0.11241255,0.16894023,0.60659415],"study_design_scores_gemma":[0.00028679986,0.00022449647,0.0026459002,0.00048448762,0.000067961184,0.0007944175,0.004743537,0.074945904,0.022700854,0.10627913,0.7866198,0.00020668787],"about_ca_topic_score_codex":0.0010506616,"about_ca_topic_score_gemma":0.002907852,"teacher_disagreement_score":0.06751102,"about_ca_system_score_codex":0.00044415696,"about_ca_system_score_gemma":0.0006771865,"threshold_uncertainty_score":0.22584689},"labels":[],"label_agreement":null},{"id":"W4411023145","doi":"10.1007/978-981-96-5654-7_10","title":"Towards Net Positive Responses to Spatial Challenges in Architecture Programs","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"George Brown College; Sheridan College","funders":"","keywords":"Architecture; Net (polyhedron); Computer architecture; Computer science; Geography; Mathematics; Archaeology","score_opus":0.011847741589621898,"score_gpt":0.21146376016529864,"score_spread":0.19961601857567673,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411023145","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05082293,0.00056673057,0.030094342,0.048649635,0.0009789566,0.00013848823,0.00012049682,0.000770259,0.8678582],"genre_scores_gemma":[0.66293913,0.0008354572,0.02489627,0.006947038,0.00021032285,0.0002721899,0.00023445739,0.0003293021,0.3033359],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976051,0.0010651088,0.000047160833,0.0001736873,0.0007280277,0.00038078104],"domain_scores_gemma":[0.9970413,0.0008893266,0.00021776922,0.00025478163,0.0007989069,0.00079783594],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004672526,0.00035162945,0.00014793435,0.000759588,0.0024899135,0.007049469,0.0014337397,0.002367847,0.027200095],"category_scores_gemma":[0.0062754573,0.00022119252,0.00020514122,0.0008698302,0.0025254905,0.0051500765,0.00667113,0.0023058886,0.003905549],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000114278555,0.00029816135,0.002496234,0.00021743106,0.000011669025,0.00022423017,0.0061534885,0.0033357365,0.0028358991,0.6668507,0.08398951,0.23347265],"study_design_scores_gemma":[0.000040963074,0.00014413557,0.0038724795,0.00030916173,0.000018458855,0.00015013108,0.024752725,0.004686078,0.00464188,0.2554071,0.70595443,0.000022454476],"about_ca_topic_score_codex":0.002472943,"about_ca_topic_score_gemma":0.010075927,"teacher_disagreement_score":0.027200095,"about_ca_system_score_codex":0.0033541229,"about_ca_system_score_gemma":0.0063673165,"threshold_uncertainty_score":0.090993404},"labels":[],"label_agreement":null},{"id":"W4411024025","doi":"10.1080/15623599.2025.2506804","title":"A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: a case study in building renovation","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Decision support system; Supply chain management; Process management; Supply chain; Project management; Engineering management; Systems engineering; Business; Operations management; Computer science; Operations research; Engineering","score_opus":0.017926777153482842,"score_gpt":0.2969953613591759,"score_spread":0.2790685842056931,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411024025","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3517515,0.0002790233,0.6358669,0.00086739,0.00008174975,0.00061667035,0.0005078745,0.0020758281,0.007953017],"genre_scores_gemma":[0.75552315,0.0001470119,0.24135724,0.00005474956,0.000013707729,0.00023918824,0.00019085816,0.000038189035,0.0024360106],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994942,0.00017991406,0.000039753937,0.00008898318,0.00012632331,0.00007078632],"domain_scores_gemma":[0.99909234,0.00051496166,0.00007142314,0.00007276429,0.00015368148,0.000094892115],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013638261,0.0007029444,0.0006081229,0.0005950281,0.00086783216,0.0015333133,0.0009463771,0.001167623,0.0030397854],"category_scores_gemma":[0.0018290813,0.00036670576,0.0004382427,0.000716781,0.00042036257,0.0008446175,0.0010328636,0.0007585652,0.00031964883],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035868742,0.00042282898,0.003237938,0.00018626302,0.0000520442,0.00083133765,0.00033343743,0.8699174,0.010664783,0.007880598,0.0014137175,0.10470112],"study_design_scores_gemma":[0.00005011627,0.00013005745,0.00035471868,0.00001096079,0.00001724718,0.000045133238,0.0000898092,0.99296415,0.002996592,0.0010543765,0.002270741,0.000016110596],"about_ca_topic_score_codex":0.010296145,"about_ca_topic_score_gemma":0.0128200725,"teacher_disagreement_score":0.010296145,"about_ca_system_score_codex":0.0012399205,"about_ca_system_score_gemma":0.002668638,"threshold_uncertainty_score":0.020472407},"labels":[],"label_agreement":null},{"id":"W4411144986","doi":"10.1108/jm2-05-2024-0156","title":"Advanced planning with supplier selection for modular construction supply chain performance improvement","year":2025,"lang":"en","type":"article","venue":"Journal of Modelling in Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Regina; École de Technologie Supérieure","funders":"","keywords":"Modular design; Process management; Supply chain; Supply chain management; Business; Selection (genetic algorithm); Supplier relationship management; Operations management; Computer science; Knowledge management; Marketing; Economics; Artificial intelligence","score_opus":0.00533635239150015,"score_gpt":0.19983303221453091,"score_spread":0.19449667982303076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411144986","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07524986,0.00022190686,0.91372025,0.0003414355,0.000020030424,0.0002440112,0.000086798515,0.00026725116,0.009848349],"genre_scores_gemma":[0.8243931,0.00024903438,0.17283636,0.0000441259,0.0000073325928,0.00021963612,0.000077521094,0.000047111927,0.002125806],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.998522,0.0007876657,0.00004130176,0.00015557419,0.00035298488,0.0001405615],"domain_scores_gemma":[0.99867225,0.0006880672,0.00026180997,0.000076820776,0.00022007662,0.00008092461],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002151588,0.001105783,0.000597922,0.0011403234,0.0007039926,0.0018096847,0.0009884259,0.0007751346,0.004991123],"category_scores_gemma":[0.0039696842,0.0005839852,0.0007070529,0.0013192999,0.0006635478,0.0017244952,0.001848345,0.0010225679,0.0003865862],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055777586,0.00005726861,0.0011847166,0.00009540031,0.000019649022,0.000073186086,0.00013359882,0.9576267,0.0015773685,0.010192565,0.00033383557,0.028649883],"study_design_scores_gemma":[0.00001634404,0.00016989221,0.00050125166,0.00004239924,0.000023988629,0.000032741573,0.00018025648,0.9851194,0.0015641588,0.010684846,0.0016459093,0.00001894366],"about_ca_topic_score_codex":0.0057500205,"about_ca_topic_score_gemma":0.00801572,"teacher_disagreement_score":0.0057500205,"about_ca_system_score_codex":0.0019607542,"about_ca_system_score_gemma":0.0038582857,"threshold_uncertainty_score":0.01669693},"labels":[],"label_agreement":null},{"id":"W4411270372","doi":"10.1109/access.2025.3579635","title":"Uncertainty Impact on Aggregator Performance for Peak Shaving","year":2025,"lang":"en","type":"article","venue":"IEEE Access","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"Natural Sciences and Engineering Research Council of Canada; Atlantic Canada Opportunities Agency","keywords":"News aggregator; Computer science; Peaking power plant; Reliability engineering; Engineering; Operating system; Electrical engineering","score_opus":0.014384507396907727,"score_gpt":0.2949709187834145,"score_spread":0.2805864113865068,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411270372","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.88024986,0.00039375405,0.11155971,0.00030401634,0.00006658429,0.00007071056,0.00015146068,0.0011531304,0.0060506207],"genre_scores_gemma":[0.99850863,0.000022822313,0.0012822966,0.000011069457,0.0000043693776,0.0000057948478,0.000025539626,0.0000072821463,0.00013210249],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9990081,0.00024619565,0.00006639315,0.0001671223,0.0002847019,0.00022746173],"domain_scores_gemma":[0.9970964,0.0013670678,0.00032661707,0.00049731537,0.00057405717,0.00013850414],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018234979,0.0009592208,0.00064667675,0.00042341065,0.0007961141,0.0014291519,0.00087541394,0.0005444037,0.0009336829],"category_scores_gemma":[0.005787441,0.00024323541,0.00030015956,0.00046631548,0.00049860124,0.001324837,0.0011941718,0.0007238649,0.0002005057],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00069430145,0.000090891364,0.009057203,0.000067992994,0.00006590459,0.00019509222,0.00020990726,0.9445099,0.009474938,0.0019090688,0.0006168414,0.033108097],"study_design_scores_gemma":[0.000010469292,0.00018485247,0.0024846063,0.000008605441,0.000026814856,0.000052166946,0.00016534378,0.9869911,0.008685736,0.000996499,0.0003747837,0.000019088819],"about_ca_topic_score_codex":0.005652019,"about_ca_topic_score_gemma":0.0035090165,"teacher_disagreement_score":0.005652019,"about_ca_system_score_codex":0.0008577372,"about_ca_system_score_gemma":0.0007681835,"threshold_uncertainty_score":0.011238217},"labels":[],"label_agreement":null},{"id":"W4411272046","doi":"10.1109/msr66628.2025.00100","title":"How Do Infrastructure-as-Code Practitioners Update Their Dependencies? An Empirical Study on Terraform Module Updates","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University; École de Technologie Supérieure; Université du Québec à Montréal","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Computer science; Code (set theory); Empirical research; Programming language","score_opus":0.011402367568528707,"score_gpt":0.26523786351194356,"score_spread":0.25383549594341487,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411272046","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99178797,0.00034815408,0.0025778248,0.0017347422,0.000020356732,0.00006510707,0.000078305566,0.00006881742,0.0033187007],"genre_scores_gemma":[0.99574125,0.0003993115,0.002136802,0.00030862464,0.000011441595,0.000068159454,0.00011115182,0.00005730419,0.0011660494],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9793489,0.008823457,0.0011408987,0.0020763897,0.0070308,0.0015796558],"domain_scores_gemma":[0.75695896,0.156325,0.042293005,0.008505832,0.028454559,0.0074626664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022369845,0.00030437118,0.00031195843,0.0031338078,0.0019947686,0.0032855286,0.0014781134,0.0014595782,0.0017995003],"category_scores_gemma":[0.17190094,0.00066267693,0.00021457265,0.0029737316,0.0028135064,0.0072964816,0.0030666308,0.0023690432,0.00040833108],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012767302,0.00034536739,0.34861353,0.0007436211,0.000042677628,0.0017075874,0.5169489,0.0007079845,0.0034161487,0.0049658567,0.0061645336,0.11621608],"study_design_scores_gemma":[0.000030680992,0.0005012668,0.31804657,0.0011721672,0.000052414336,0.0014491224,0.5975184,0.004441912,0.0020191385,0.0025755311,0.07203011,0.00016274606],"about_ca_topic_score_codex":0.011044361,"about_ca_topic_score_gemma":0.015584342,"teacher_disagreement_score":0.022369845,"about_ca_system_score_codex":0.0044155247,"about_ca_system_score_gemma":0.006469034,"threshold_uncertainty_score":0.11830449},"labels":[],"label_agreement":null},{"id":"W4411283738","doi":"10.2174/0118741495375592250610133455","title":"Ability of Technologies to Collect the Positioning and Occupancy of Work Crews and Resources on Construction Job Sites","year":2025,"lang":"en","type":"article","venue":"The Open Civil Engineering Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Occupancy; Work (physics); Engineering; Post-occupancy evaluation; Transport engineering; Construction engineering; Computer science; Architectural engineering; Mechanical engineering","score_opus":0.006796001610690171,"score_gpt":0.2151367394910073,"score_spread":0.20834073788031715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411283738","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.19961014,0.0017860533,0.69781196,0.0014893773,0.00029521508,0.0009898181,0.010488916,0.0036249384,0.08390375],"genre_scores_gemma":[0.5842416,0.0015553132,0.40191633,0.0001544873,0.000098882614,0.0006043827,0.0035019089,0.0001938544,0.00773317],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9961669,0.00070115586,0.0002868734,0.00062464236,0.0019889828,0.00023139756],"domain_scores_gemma":[0.9894511,0.0038406965,0.001883932,0.0016865231,0.0028373764,0.00030047106],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033941953,0.0006283859,0.00030862392,0.0031296469,0.0006217278,0.003073924,0.000952405,0.0005714774,0.0058595305],"category_scores_gemma":[0.008914045,0.000468512,0.00047320838,0.0029783058,0.00060214545,0.0021249591,0.0015540533,0.000564735,0.0023386956],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019813151,0.00017742651,0.16170949,0.001216898,0.00010868903,0.00015007572,0.0026398243,0.015866503,0.016511496,0.009562311,0.010242673,0.7816166],"study_design_scores_gemma":[0.00006241204,0.0012893756,0.5205192,0.002586225,0.00032297935,0.0018519034,0.015029795,0.10813819,0.072363794,0.018452404,0.25883296,0.0005507614],"about_ca_topic_score_codex":0.007607468,"about_ca_topic_score_gemma":0.009046758,"teacher_disagreement_score":0.007607468,"about_ca_system_score_codex":0.00076090446,"about_ca_system_score_gemma":0.001976836,"threshold_uncertainty_score":0.01960206},"labels":[],"label_agreement":null},{"id":"W4411379290","doi":"10.1061/jcemd4.coeng-15724","title":"Assessing an Immersive Virtual Reality–Based Simulation Game Capability to Study the Social Mechanisms Enabled by the Last Planner System in Projects","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Planner; Virtual reality; Human–computer interaction; Computer science; Simulation; Artificial intelligence","score_opus":0.011604140962274663,"score_gpt":0.25556153245668267,"score_spread":0.243957391494408,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411379290","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99113935,0.000019116362,0.007305617,0.000027670163,0.0000070154483,0.0002526489,0.00006592871,0.000057768048,0.001124877],"genre_scores_gemma":[0.9761485,0.000047725305,0.02259934,0.000030165522,0.0000042257507,0.00049806444,0.00017126121,0.000015736172,0.00048502744],"study_design_codex":"observational","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9982085,0.00095535954,0.00013434872,0.00018944002,0.00033786253,0.00017449087],"domain_scores_gemma":[0.9952544,0.0024399536,0.0008236093,0.00034646702,0.00049728906,0.00063833606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023983652,0.0009623647,0.00035490276,0.0006874383,0.00031511916,0.0011078544,0.00092427677,0.0006096904,0.002111173],"category_scores_gemma":[0.009439116,0.00040616325,0.00050971296,0.00022812028,0.0005383244,0.001132055,0.0015499841,0.0006534228,0.00026324007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044401055,0.029337037,0.34566277,0.003193088,0.0010000804,0.0017066329,0.041424192,0.077421285,0.2390837,0.0080487495,0.0038915419,0.24479075],"study_design_scores_gemma":[0.0012191576,0.046582356,0.6042802,0.00047469288,0.00067139347,0.0011498468,0.016870534,0.23662409,0.06693421,0.005313951,0.019267997,0.00061168976],"about_ca_topic_score_codex":0.0012627455,"about_ca_topic_score_gemma":0.0021047697,"teacher_disagreement_score":0.0023983652,"about_ca_system_score_codex":0.00044871666,"about_ca_system_score_gemma":0.00060535927,"threshold_uncertainty_score":0.012683928},"labels":[],"label_agreement":null},{"id":"W4411414079","doi":"10.69554/bxip3397","title":"Avoiding disastrous data-based decisions: The secret to meaningful workplace insights","year":2025,"lang":"en","type":"article","venue":"Corporate real estate journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Workplace Health, Safety and Compensation Commission","funders":"","keywords":"Overconfidence effect; Ingenuity; Quality (philosophy); Decision quality; Key (lock); Data quality; Nomothetic and idiographic; Computer science; Real estate; Data science; Risk analysis (engineering); Management science; Knowledge management; Business; Marketing; Psychology; Engineering; Economics; Computer security; Finance","score_opus":0.04140121606694259,"score_gpt":0.2604750077955436,"score_spread":0.21907379172860103,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411414079","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.062344093,0.013125464,0.2941001,0.4890037,0.002869278,0.00039159943,0.00032248488,0.0005708761,0.1372724],"genre_scores_gemma":[0.7772031,0.009174106,0.18098731,0.01987976,0.0012019912,0.00041753598,0.00026894337,0.00027279617,0.010594494],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9512878,0.031658098,0.0018479131,0.002102025,0.010829006,0.0022752176],"domain_scores_gemma":[0.8943997,0.07370071,0.004873788,0.015192415,0.00740405,0.004429394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.05404558,0.0009378216,0.0010638929,0.0031509146,0.0080774035,0.031216962,0.00353398,0.0072293305,0.004419018],"category_scores_gemma":[0.082195185,0.0009035751,0.00089663855,0.0025468452,0.04559105,0.039953124,0.020174779,0.011365057,0.0017534697],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013144976,0.00024230866,0.0039109355,0.0010984207,0.00008676707,0.0010555706,0.09779767,0.0024435914,0.0022182656,0.63789415,0.029740505,0.22338046],"study_design_scores_gemma":[0.000022689303,0.00006996667,0.0007129668,0.0011619942,0.000018313951,0.0003807446,0.061280202,0.0017439632,0.0009832352,0.77754956,0.15600635,0.00006994725],"about_ca_topic_score_codex":0.0015647776,"about_ca_topic_score_gemma":0.0019754875,"teacher_disagreement_score":0.05404558,"about_ca_system_score_codex":0.004302559,"about_ca_system_score_gemma":0.0137986215,"threshold_uncertainty_score":0.2858237},"labels":[],"label_agreement":null},{"id":"W4411484891","doi":"10.1109/icccbda64898.2025.11030527","title":"Enhancing Infrastructure-as-Code with Objectoriented Programming for Improving Maintainability","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Athabasca University","funders":"","keywords":"Maintainability; Computer science; Programming language; Code (set theory); Operating system; Software engineering","score_opus":0.0022840101050094247,"score_gpt":0.2089895342650003,"score_spread":0.20670552415999088,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411484891","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0612624,0.00022011806,0.92252,0.0007168867,0.00004506545,0.00013673543,0.000039337086,0.0045947083,0.010464741],"genre_scores_gemma":[0.24705604,0.00036216254,0.74712145,0.0001999038,0.000026035435,0.00013651508,0.00017868697,0.0017548865,0.003164357],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99779344,0.00053531193,0.00010529816,0.00022453858,0.0011580981,0.0001833711],"domain_scores_gemma":[0.9923383,0.002165917,0.00096388924,0.0028057154,0.0014723917,0.0002537342],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035088682,0.00061010866,0.00023503856,0.0013291821,0.00052217976,0.0024813474,0.0016892522,0.00063547824,0.0010518609],"category_scores_gemma":[0.014102173,0.0003600439,0.0004418921,0.0010051462,0.0012471795,0.0035128803,0.0024996973,0.0015736109,0.00051074673],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012113227,0.0005790836,0.014294526,0.00063110905,0.00009474173,0.0006318962,0.0057237283,0.06044887,0.0991368,0.151753,0.0047343457,0.66185075],"study_design_scores_gemma":[0.00010891158,0.0005936339,0.012145083,0.0007432202,0.00025947092,0.0017978128,0.0019934278,0.42174417,0.1348204,0.15641542,0.26913345,0.00024494887],"about_ca_topic_score_codex":0.0021403509,"about_ca_topic_score_gemma":0.0032257943,"teacher_disagreement_score":0.0035088682,"about_ca_system_score_codex":0.00077105546,"about_ca_system_score_gemma":0.0024593978,"threshold_uncertainty_score":0.018556893},"labels":[],"label_agreement":null},{"id":"W4411864846","doi":"10.1007/978-981-96-2802-5_34","title":"Digital Twinning of Existing Indoor Space for Improved Indoor Environmental Quality Monitoring and Assessment","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Environmental quality; Crystal twinning; Environmental science; Quality (philosophy); Space (punctuation); Computer science; Materials science; Political science; Physics","score_opus":0.015098866154901832,"score_gpt":0.25117124689516707,"score_spread":0.23607238074026524,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411864846","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.25471243,0.0010398283,0.72097224,0.000087455206,0.00027428477,0.000103929735,0.0013605335,0.0026927404,0.018756533],"genre_scores_gemma":[0.6939239,0.00087019114,0.2945621,0.00005964935,0.00003740248,0.000075412034,0.0012454065,0.00045553033,0.008770375],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996474,0.000023114935,0.000011504326,0.0000791625,0.00020956692,0.000029194058],"domain_scores_gemma":[0.9996475,0.00007448242,0.000034334476,0.00009459904,0.0001255376,0.000023632512],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002537709,0.0004910022,0.00048024298,0.0013614175,0.00024994524,0.001142745,0.0007663012,0.0003725313,0.0047865347],"category_scores_gemma":[0.0007021413,0.00030716942,0.0004017843,0.0022417756,0.00030278284,0.0013290492,0.0015786723,0.0004729252,0.0010345215],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000476597,0.0001447105,0.011231039,0.0004489623,0.00006932527,0.000175687,0.00048423323,0.036842387,0.17891416,0.004869593,0.0037562859,0.76258695],"study_design_scores_gemma":[0.000041223186,0.00053052406,0.05541397,0.00016815442,0.0002759396,0.0012732771,0.0012236757,0.5151499,0.3599606,0.008620795,0.057172667,0.00016938036],"about_ca_topic_score_codex":0.0019030058,"about_ca_topic_score_gemma":0.0054747057,"teacher_disagreement_score":0.0047865347,"about_ca_system_score_codex":0.00027233735,"about_ca_system_score_gemma":0.0004036029,"threshold_uncertainty_score":0.01601249},"labels":[],"label_agreement":null},{"id":"W4411929702","doi":"10.2139/ssrn.5335994","title":"A Multi-User Game-Based System for Planning Modular Construction Activities","year":2025,"lang":"en","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Computer science; Modular construction; Human–computer interaction; Operating system","score_opus":0.009329120363591474,"score_gpt":0.23127232615344676,"score_spread":0.22194320578985527,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4411929702","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08507408,0.0001360568,0.81767607,0.0001442335,0.000113005546,0.0011747071,0.0029726452,0.081416935,0.011292255],"genre_scores_gemma":[0.55099565,0.00016078581,0.43128598,0.0002113929,0.000027674607,0.0015758446,0.003613088,0.0014936508,0.010635982],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9996449,0.00009634434,0.00003356946,0.00009140193,0.00009753115,0.00003627873],"domain_scores_gemma":[0.99930584,0.00029407325,0.000032741897,0.000093739465,0.00011454004,0.00015906221],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00064922904,0.0012483002,0.0010302416,0.001136117,0.00039385108,0.0011557747,0.0021429963,0.0010608429,0.017749371],"category_scores_gemma":[0.0015832967,0.00051264523,0.0004579906,0.0005580037,0.00028887595,0.0010333931,0.0021485067,0.00053371367,0.003339463],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0082696555,0.003038871,0.013053493,0.0010921095,0.0005587783,0.001992506,0.0022233354,0.18660767,0.11314682,0.015666185,0.047953684,0.606397],"study_design_scores_gemma":[0.0003283421,0.00039671166,0.0027886676,0.000038921757,0.00011749947,0.00025796678,0.00013871756,0.95524865,0.013675182,0.005722228,0.021181284,0.00010585138],"about_ca_topic_score_codex":0.006015097,"about_ca_topic_score_gemma":0.0074366746,"teacher_disagreement_score":0.017749371,"about_ca_system_score_codex":0.0005565682,"about_ca_system_score_gemma":0.0007003653,"threshold_uncertainty_score":0.05937755},"labels":[],"label_agreement":null},{"id":"W4412007554","doi":"10.3390/buildings15132338","title":"Understanding the Disruptiveness of Integrated Project Delivery (IPD) in the AEC Industry","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Engineering; Integrated project delivery; Systems engineering; Construction engineering; Manufacturing engineering; Project management","score_opus":0.038152690510596124,"score_gpt":0.2561770530719631,"score_spread":0.21802436256136698,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412007554","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.95535135,0.0014936925,0.02161324,0.0024231016,0.000033724693,0.00017522332,0.000034695062,0.000024951312,0.018849928],"genre_scores_gemma":[0.9955117,0.00076165167,0.0030251038,0.00015945958,0.000009561919,0.00007111086,0.000022617989,0.0000072445346,0.00043145978],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9811255,0.009337166,0.001352031,0.0011553211,0.0054935515,0.0015364003],"domain_scores_gemma":[0.92436165,0.052351616,0.011834614,0.0033493214,0.006033072,0.0020698004],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02112788,0.00041325504,0.00042272423,0.0039792694,0.0023339887,0.008391687,0.0012200745,0.0021019431,0.0009750828],"category_scores_gemma":[0.05006158,0.0005694865,0.00045441056,0.0025440825,0.007756127,0.0068130214,0.0069651646,0.002186374,0.0001662796],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00027909043,0.0006516824,0.3174722,0.0016411183,0.0001631339,0.0024095527,0.28799146,0.0074309413,0.008583077,0.09201134,0.0008648106,0.28050166],"study_design_scores_gemma":[0.000051962008,0.0018636114,0.40778244,0.0021739278,0.0001522538,0.0022476134,0.45334098,0.015399244,0.006586931,0.058608342,0.051589537,0.00020316688],"about_ca_topic_score_codex":0.004620599,"about_ca_topic_score_gemma":0.0054206233,"teacher_disagreement_score":0.02112788,"about_ca_system_score_codex":0.0081327595,"about_ca_system_score_gemma":0.006785538,"threshold_uncertainty_score":0.11173624},"labels":[],"label_agreement":null},{"id":"W4412044970","doi":"10.1145/3715668.3736354","title":"Towards Interactive AI-assisted Material Selection for Sustainable Building Design","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Autodesk (Canada)","funders":"","keywords":"Selection (genetic algorithm); Computer science; Assisted living; Architectural engineering; Human–computer interaction; Artificial intelligence; Engineering","score_opus":0.007777514216300937,"score_gpt":0.24843284211735778,"score_spread":0.24065532790105684,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412044970","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013628075,0.00013859579,0.9619351,0.00053678727,0.00004076571,0.00030906283,0.00025518422,0.008183203,0.014973229],"genre_scores_gemma":[0.07660412,0.00016293528,0.9186288,0.00010476171,0.000009839195,0.00026279234,0.00048476565,0.0005019387,0.0032400105],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9978123,0.0009879771,0.0001071074,0.00025424364,0.0007211107,0.00011735882],"domain_scores_gemma":[0.994759,0.0034346848,0.0001837917,0.000817716,0.00056400045,0.00024078641],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003213266,0.0013924051,0.0005523602,0.0014886935,0.0013644919,0.0044340305,0.0024059927,0.0017296532,0.010125708],"category_scores_gemma":[0.0095566185,0.0008328533,0.0012175813,0.001177075,0.0018233255,0.0028220292,0.0043823035,0.0016189335,0.0028282998],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00073526625,0.0012508327,0.0030157908,0.0015278008,0.00013859016,0.0015795925,0.016359022,0.15562004,0.09304395,0.13434944,0.022490917,0.5698888],"study_design_scores_gemma":[0.00020788643,0.0002355399,0.0015631041,0.00045082293,0.0000682493,0.00047129957,0.0029810893,0.6365577,0.043748032,0.13207604,0.18144462,0.00019569935],"about_ca_topic_score_codex":0.004658319,"about_ca_topic_score_gemma":0.00804826,"teacher_disagreement_score":0.010125708,"about_ca_system_score_codex":0.0013300596,"about_ca_system_score_gemma":0.0026728408,"threshold_uncertainty_score":0.033873856},"labels":[],"label_agreement":null},{"id":"W4412059615","doi":"10.55300/gz87bq40","title":"Keuntungan, Batasan, dan Tantangan Penggunaan Building Information Modeling dalam Proses Pembelajaran","year":2025,"lang":"en","type":"article","venue":"Archvisual Jurnal Arsitektur dan Perencanaan","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Mathematics education; Computer science; Psychology","score_opus":0.008920599286025576,"score_gpt":0.23968094172274476,"score_spread":0.2307603424367192,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412059615","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45475483,0.015069261,0.049824916,0.008888944,0.00097637076,0.00025700903,0.0007161801,0.00074343354,0.4687691],"genre_scores_gemma":[0.88209826,0.012168885,0.03576354,0.0007056885,0.000077595614,0.0002446849,0.000733554,0.00010840383,0.06809944],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9995165,0.00013106731,0.0000313021,0.00008238271,0.00017036463,0.0000683957],"domain_scores_gemma":[0.9996196,0.00013929763,0.000052142444,0.000036329573,0.00011271094,0.00003986577],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006970861,0.00065673166,0.00033442938,0.0007892554,0.0015906412,0.0032600346,0.00043611464,0.0006573648,0.014128495],"category_scores_gemma":[0.001047427,0.000368532,0.0004117246,0.0014807379,0.00062082394,0.003586316,0.0018957296,0.0011300725,0.0027839537],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024838472,0.00070132304,0.025216231,0.0019323248,0.00006892089,0.00252405,0.020632746,0.0040311194,0.008514171,0.06380038,0.019739516,0.85259086],"study_design_scores_gemma":[0.000041226154,0.0003760135,0.03916021,0.001333563,0.00020260297,0.004297263,0.040108938,0.010317818,0.013770132,0.027627135,0.8626096,0.00015544216],"about_ca_topic_score_codex":0.0021788161,"about_ca_topic_score_gemma":0.0046026506,"teacher_disagreement_score":0.014128495,"about_ca_system_score_codex":0.0008768402,"about_ca_system_score_gemma":0.0023420013,"threshold_uncertainty_score":0.047264576},"labels":[],"label_agreement":null},{"id":"W4412098050","doi":"10.1080/13467581.2025.2527976","title":"Enhancing construction efficiency: assessing the values and barriers of integrating e-procurement with BIM","year":2025,"lang":"en","type":"article","venue":"Journal of Asian Architecture and Building Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Stantec (Canada)","funders":"","keywords":"Building information modeling; Procurement; Business; Process management; Construction engineering; Construction industry; Knowledge management; Risk analysis (engineering); Engineering; Computer science; Operations management; Marketing","score_opus":0.0022235665599648195,"score_gpt":0.2048105207704247,"score_spread":0.20258695421045989,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412098050","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.955513,0.00057566026,0.011972707,0.0012617827,0.000018269877,0.000211671,0.000048253987,0.000027425496,0.030371305],"genre_scores_gemma":[0.9958974,0.00018801446,0.0033412934,0.00006304023,0.0000046887767,0.000065658394,0.000020110127,0.000009201049,0.00041066288],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9633098,0.020759434,0.0019704204,0.0011301065,0.009561828,0.0032684067],"domain_scores_gemma":[0.8977521,0.07156926,0.012948246,0.0034255704,0.012074538,0.0022301753],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025488345,0.00059205166,0.0006379459,0.0028964973,0.0014250096,0.0067460914,0.0013277549,0.0012643521,0.002535778],"category_scores_gemma":[0.070907526,0.0005600223,0.00064710155,0.0032707758,0.003312413,0.007125533,0.005622675,0.0013880407,0.00038631065],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009046668,0.0014757151,0.6139351,0.0027366423,0.00043507305,0.0011072936,0.062214613,0.016041731,0.008498912,0.06721301,0.0015250734,0.2239122],"study_design_scores_gemma":[0.000066133856,0.0026460951,0.5936139,0.0032120205,0.00052487175,0.0011111784,0.26916364,0.03977786,0.0110418135,0.02809743,0.05046936,0.00027574832],"about_ca_topic_score_codex":0.002654454,"about_ca_topic_score_gemma":0.0032248637,"teacher_disagreement_score":0.025488345,"about_ca_system_score_codex":0.0035836485,"about_ca_system_score_gemma":0.005935226,"threshold_uncertainty_score":0.13479686},"labels":[],"label_agreement":null},{"id":"W4412101857","doi":"10.13189/cea.2025.131336","title":"Review of the Modular Construction System","year":2025,"lang":"en","type":"article","venue":"Civil Engineering and Architecture","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Modular design; Modular construction; Engineering; Construction engineering; Systems engineering; Computer science; Architectural engineering; Engineering management; Operating system","score_opus":0.0018517112102698684,"score_gpt":0.1577335931516865,"score_spread":0.15588188194141664,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412101857","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0006402133,0.9688845,0.003479613,0.0011814217,0.0014970019,0.000027765247,0.00013806719,0.000048105627,0.02410339],"genre_scores_gemma":[0.008338554,0.97799027,0.0032267212,0.0008158744,0.0010761612,0.000048267233,0.00030141688,0.000050552953,0.008152144],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99906963,0.00020405558,0.00014153267,0.00013586578,0.000387632,0.00006135595],"domain_scores_gemma":[0.9988348,0.0005490341,0.000122027915,0.0000635677,0.00037778507,0.000052710737],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011378439,0.0008644184,0.00082979165,0.0039950246,0.0005957573,0.0017095382,0.0013306494,0.0013673127,0.014783059],"category_scores_gemma":[0.0030288612,0.00045192818,0.00069435546,0.004709499,0.0012757082,0.0027129205,0.0010758907,0.0011264227,0.006719796],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000049610197,0.000028466688,0.00025712984,0.016691139,0.00004841534,0.00023908787,0.0002488744,0.0011712469,0.00079116947,0.04580925,0.07480894,0.85985667],"study_design_scores_gemma":[0.0000017373065,0.000017728236,0.00032416484,0.0021657504,0.00001591715,0.00039953997,0.00004033664,0.00006845885,0.00013755985,0.0017022118,0.9951192,0.0000074563063],"about_ca_topic_score_codex":0.002868829,"about_ca_topic_score_gemma":0.0027661053,"teacher_disagreement_score":0.014783059,"about_ca_system_score_codex":0.0016202558,"about_ca_system_score_gemma":0.002769377,"threshold_uncertainty_score":0.04945427},"labels":[],"label_agreement":null},{"id":"W4412117412","doi":"10.1139/cjce-2025-0009","title":"Electrochemical surface engineering for optimizing concrete interactions with formwork and reinforcement","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formwork; Reinforcement; Electrochemistry; Materials science; Structural engineering; Engineering; Computer science; Composite material; Electrode; Chemistry","score_opus":0.003575045061351328,"score_gpt":0.17501560254649354,"score_spread":0.1714405574851422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412117412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7033508,0.036388833,0.21546054,0.0016025852,0.0007736308,0.00029944832,0.00045538478,0.0012130907,0.040455665],"genre_scores_gemma":[0.94037175,0.009845644,0.04188964,0.00017820593,0.00005683638,0.00010250853,0.00028411605,0.00009560715,0.007175681],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99970776,0.000022908609,0.000015100597,0.00004366491,0.0001679634,0.000042633932],"domain_scores_gemma":[0.99986863,0.00003057516,0.000025945386,0.00001082834,0.000048765076,0.000015211556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002977219,0.00047187647,0.00038555992,0.00041660308,0.00023079812,0.00084022415,0.0005486327,0.00046615457,0.0015933567],"category_scores_gemma":[0.000527631,0.00023409342,0.0004342162,0.00042106042,0.00021733255,0.0006675943,0.00057799614,0.0008764647,0.0006175393],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037571226,0.00009529569,0.0004566184,0.0006754348,0.000031458825,0.00012798695,0.00007472087,0.004240145,0.945002,0.002841629,0.0009069327,0.045510165],"study_design_scores_gemma":[0.000018983506,0.000272572,0.0013592698,0.000042662334,0.000050764385,0.0002165318,0.0001053935,0.019059112,0.95049447,0.0008856189,0.027471129,0.000023479426],"about_ca_topic_score_codex":0.00068647595,"about_ca_topic_score_gemma":0.002224355,"teacher_disagreement_score":0.0015933567,"about_ca_system_score_codex":0.0004669188,"about_ca_system_score_gemma":0.00041364328,"threshold_uncertainty_score":0.0053302646},"labels":[],"label_agreement":null},{"id":"W4412218831","doi":"","title":"Whitepaper on Digitalization of Buildings:Digital planning an operational performance","year":2024,"lang":"en","type":"report","venue":"Technical University of Denmark, DTU Orbit (Technical University of Denmark, DTU)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Canadian Anesthesia Research Foundation","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.016135223532989178,"score_gpt":0.2175828360523639,"score_spread":0.2014476125193747,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412218831","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.033392902,0.009413499,0.015447672,0.010711644,0.003269541,0.00032608828,0.016242158,0.00071060506,0.9104859],"genre_scores_gemma":[0.14045726,0.013101551,0.01588777,0.0005505621,0.00075404136,0.00016713605,0.023482759,0.0009232718,0.8046757],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99763155,0.00026026074,0.00007916834,0.00022831022,0.0015691585,0.00023152417],"domain_scores_gemma":[0.9979455,0.0006032793,0.00009919817,0.00032004557,0.00078357605,0.0002483032],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020588287,0.0007832626,0.0005070422,0.002344274,0.001173674,0.0057074307,0.0008733394,0.0013643244,0.07059512],"category_scores_gemma":[0.002913264,0.00038816413,0.00041075633,0.0050167996,0.0006189974,0.0028910707,0.0013468048,0.0010823482,0.012609356],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00059617875,0.00043150756,0.0029822588,0.00045625033,0.000044494336,0.00026243136,0.0006064182,0.012387371,0.003797953,0.07373664,0.62899387,0.27570465],"study_design_scores_gemma":[0.000025443549,0.000068674264,0.007456046,0.00017064967,0.000036344954,0.000087012486,0.0005774334,0.0026456073,0.009620638,0.0082027735,0.9710854,0.000023939187],"about_ca_topic_score_codex":0.038188256,"about_ca_topic_score_gemma":0.04218798,"teacher_disagreement_score":0.07059512,"about_ca_system_score_codex":0.0029192704,"about_ca_system_score_gemma":0.006191878,"threshold_uncertainty_score":0.23616421},"labels":[],"label_agreement":null},{"id":"W4412273415","doi":"","title":"Digital entrepriseret:Retlige perspektiver for anvendelsen af Building Information Modelling (BIM) i bygge- og anlægssektoren","year":2018,"lang":"da","type":"article","venue":"Research at the University of Copenhagen (University of Copenhagen)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Institute on Governance","funders":"","keywords":"Building information modeling; Computer science; Environmental science; Architectural engineering; Engineering; Operations management","score_opus":0.03295431540649981,"score_gpt":0.2437684487304249,"score_spread":0.2108141333239251,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412273415","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08651635,0.011305911,0.31808266,0.023589995,0.0054937685,0.0004635732,0.0060398793,0.008141867,0.540366],"genre_scores_gemma":[0.39061424,0.013761491,0.27931297,0.002754936,0.00091685844,0.0004396812,0.010915229,0.005005768,0.29627892],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957212,0.0009619108,0.00029591648,0.0005871486,0.002156206,0.00027762298],"domain_scores_gemma":[0.99680495,0.0010599482,0.00019520808,0.0007394937,0.0008211579,0.0003793045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048725083,0.0010028157,0.0007078393,0.0024494042,0.0020251896,0.011571837,0.001434874,0.0023358504,0.051437773],"category_scores_gemma":[0.008897867,0.00061424443,0.0006142731,0.0034679177,0.0020370386,0.008640052,0.009251185,0.0022997109,0.017451165],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004287384,0.0003599944,0.0027381994,0.00095643214,0.000046909754,0.00066434545,0.0062178117,0.005214992,0.0063101947,0.10518938,0.07200863,0.7998645],"study_design_scores_gemma":[0.000055063792,0.00009468731,0.0020751818,0.0005863166,0.00005566767,0.00046931652,0.0028696668,0.0053198184,0.008817041,0.025711732,0.9538757,0.00006975355],"about_ca_topic_score_codex":0.0051859915,"about_ca_topic_score_gemma":0.0059949597,"teacher_disagreement_score":0.051437773,"about_ca_system_score_codex":0.0016362438,"about_ca_system_score_gemma":0.004141647,"threshold_uncertainty_score":0.17207646},"labels":[],"label_agreement":null},{"id":"W4412368587","doi":"10.11159/ijci.2025.008","title":"Improving Operational Efficiency in Construction Businesses","year":2025,"lang":"en","type":"article","venue":"International Journal of Civil Infrastructure","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Business; Operational efficiency; Marketing","score_opus":0.0026602198873757173,"score_gpt":0.21310043124196543,"score_spread":0.2104402113545897,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412368587","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15046978,0.7028149,0.036482386,0.019815037,0.0005888874,0.0013994667,0.0010426532,0.00017762916,0.08720926],"genre_scores_gemma":[0.68778,0.26576144,0.039329533,0.003397463,0.00021918217,0.0009349838,0.0005498905,0.00006846752,0.0019590307],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.94523,0.03699254,0.005153992,0.0015118724,0.009787006,0.0013246813],"domain_scores_gemma":[0.93697846,0.04192453,0.009474573,0.0016869366,0.00931729,0.00061828183],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.036211003,0.00060590566,0.0010554418,0.009886182,0.000977193,0.007359573,0.0013174546,0.001146581,0.0019798148],"category_scores_gemma":[0.07240402,0.0004693571,0.0011332203,0.010585306,0.0020518787,0.0047678268,0.0023936762,0.0008663442,0.00031936006],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021035147,0.00032079205,0.017112019,0.06601002,0.0014467702,0.00018927112,0.0054123546,0.0046474165,0.0009812525,0.039627343,0.008504263,0.85553825],"study_design_scores_gemma":[0.000351726,0.0020615284,0.09411246,0.27900493,0.00549607,0.0010006902,0.033879984,0.0039083944,0.008594717,0.06826662,0.5030664,0.00025649543],"about_ca_topic_score_codex":0.0051193777,"about_ca_topic_score_gemma":0.008506584,"teacher_disagreement_score":0.036211003,"about_ca_system_score_codex":0.005851306,"about_ca_system_score_gemma":0.019465072,"threshold_uncertainty_score":0.19150436},"labels":[],"label_agreement":null},{"id":"W4412368845","doi":"10.1177/03611981251340386","title":"Illinois Tollway Specification Management and Resource Tool","year":2025,"lang":"en","type":"article","venue":"Transportation Research Record Journal of the Transportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"WSP (Canada)","funders":"","keywords":"Computer science; Process (computing); Bidding; Quality (philosophy); Resource (disambiguation); Bridge (graph theory); Software engineering; Change control; Schedule; Risk analysis (engineering); Engineering management; Control (management); Engineering; Business; Programming language","score_opus":0.03722630235783259,"score_gpt":0.3131850718766516,"score_spread":0.27595876951881904,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412368845","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010977668,0.00035204878,0.461025,0.0011286864,0.00026623625,0.0015229675,0.025934298,0.19239067,0.30640242],"genre_scores_gemma":[0.091595724,0.00060169137,0.52038723,0.00079330953,0.00009069387,0.0032301142,0.055013094,0.023952823,0.3043354],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976767,0.0003911776,0.00022105181,0.00019246183,0.0014021005,0.00011648568],"domain_scores_gemma":[0.9940002,0.0029264432,0.00027703613,0.0009135965,0.0016705759,0.0002121664],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026468062,0.00095368613,0.00043778803,0.0048593953,0.0008194307,0.002946678,0.0020926173,0.00082404906,0.16620186],"category_scores_gemma":[0.010281739,0.0008922202,0.00045670298,0.0022996343,0.0005226294,0.0030788612,0.0027179192,0.0011308845,0.049930558],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025076067,0.00022916551,0.003185451,0.00054980634,0.000016603117,0.00036953567,0.0011170696,0.0053739236,0.0038897886,0.045721345,0.46786866,0.47142795],"study_design_scores_gemma":[0.00004582054,0.000047935875,0.0013244321,0.0002127362,0.00001098099,0.00027018104,0.00034478123,0.016500117,0.0053036353,0.0052237385,0.9706504,0.000065234766],"about_ca_topic_score_codex":0.0065116533,"about_ca_topic_score_gemma":0.008881645,"teacher_disagreement_score":0.16620186,"about_ca_system_score_codex":0.0014001408,"about_ca_system_score_gemma":0.0032692822,"threshold_uncertainty_score":0.5560006},"labels":[],"label_agreement":null},{"id":"W4412430439","doi":"10.1080/15623599.2025.2530647","title":"Quantification of economic influences on technology adoption and diffusion in the construction industry","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan College; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Diffusion; Business; Industrial organization; Construction industry; Economic geography; Economics; Engineering; Construction engineering","score_opus":0.006926203295985709,"score_gpt":0.24708631096952324,"score_spread":0.24016010767353754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412430439","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9966337,0.00005931215,0.0009747348,0.000055256747,0.0000011355662,0.000013443458,0.00006571671,0.0000029012,0.0021938162],"genre_scores_gemma":[0.99931073,0.000053851414,0.00037864278,0.0000037543164,0.0000011803177,0.000011559786,0.000050289524,0.0000014278017,0.00018841738],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9986957,0.0006046241,0.00006481342,0.00014144731,0.00024045033,0.0002530359],"domain_scores_gemma":[0.98354554,0.012612525,0.0022415295,0.00049853633,0.0007383442,0.0003635086],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0026151673,0.00022874297,0.00024752723,0.001279004,0.00040611738,0.0016719813,0.0002916413,0.00046523212,0.0018950647],"category_scores_gemma":[0.01638391,0.000201673,0.0004060653,0.0016096453,0.0006013503,0.0013868648,0.0010220469,0.00059221813,0.00020796755],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031673355,0.0002726256,0.9388128,0.00006529264,0.00012551347,0.00022950722,0.0013155342,0.030718679,0.00077677955,0.006869656,0.00018499023,0.020311924],"study_design_scores_gemma":[0.000012151013,0.0002606133,0.9014557,0.00005592569,0.00009874828,0.00007780212,0.0046858178,0.08621914,0.00088531483,0.004400212,0.0018134161,0.000035240555],"about_ca_topic_score_codex":0.008054136,"about_ca_topic_score_gemma":0.008308778,"teacher_disagreement_score":0.008054136,"about_ca_system_score_codex":0.0013804876,"about_ca_system_score_gemma":0.0007058514,"threshold_uncertainty_score":0.016014516},"labels":[],"label_agreement":null},{"id":"W4412493587","doi":"10.1007/s44150-025-00135-5","title":"Identifying challenges for extended design for manufacturing and assembly (DfMA) in all phases of a construction project","year":2025,"lang":"en","type":"article","venue":"Architecture Structures and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Montréal; École de Technologie Supérieure","funders":"Mitacs","keywords":"Context (archaeology); Construction industry; Construction management; Engineering; Work (physics); Process management; Productivity; Conceptual framework; Function (biology); Knowledge management; Construction engineering; Computer science; Civil engineering","score_opus":0.03353039610107078,"score_gpt":0.287844381431861,"score_spread":0.2543139853307902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412493587","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.4149058,0.004552554,0.4360556,0.029777318,0.0004619924,0.00064807007,0.00059604313,0.00091485487,0.11208786],"genre_scores_gemma":[0.80025136,0.0008768763,0.19267878,0.0007420008,0.000056710545,0.00025418037,0.00037928138,0.00015446737,0.004606391],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.9827597,0.008946088,0.0009555306,0.0013401541,0.0045107994,0.001487698],"domain_scores_gemma":[0.96838826,0.016007192,0.0032918004,0.0034019079,0.0072581368,0.0016527036],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.019304415,0.000784574,0.00088348857,0.0015712947,0.0030958254,0.012583626,0.00257157,0.0029254411,0.005087089],"category_scores_gemma":[0.038160328,0.00082205335,0.00064317137,0.00160617,0.002806154,0.011458843,0.007733928,0.0030943777,0.0012077229],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005190597,0.000686499,0.055041563,0.001148763,0.00012879401,0.00071119727,0.013267696,0.063972116,0.00695911,0.25857782,0.01554832,0.58343905],"study_design_scores_gemma":[0.00008944831,0.00087296654,0.05478287,0.0022729442,0.00016982848,0.0016657674,0.07631821,0.30469176,0.008353751,0.3508604,0.1996399,0.00028222898],"about_ca_topic_score_codex":0.012951183,"about_ca_topic_score_gemma":0.0260755,"teacher_disagreement_score":0.019304415,"about_ca_system_score_codex":0.004080701,"about_ca_system_score_gemma":0.012948013,"threshold_uncertainty_score":0.10209268},"labels":[],"label_agreement":null},{"id":"W4412670856","doi":"10.1016/j.autcon.2025.106429","title":"Architecture of tomorrow: The construction industry in the era of artificial intelligence","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":12,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Architecture; Engineering; Artificial intelligence; Construction industry; Architectural engineering; Engineering management; Computer science; Construction engineering; Manufacturing engineering; Art; Visual arts","score_opus":0.00922128614498672,"score_gpt":0.2375733588344598,"score_spread":0.22835207268947308,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412670856","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.105698824,0.028202862,0.033503324,0.10350702,0.0020215507,0.00006641533,0.0004970316,0.00079301983,0.72571],"genre_scores_gemma":[0.8323395,0.0103477705,0.03190298,0.0037088273,0.00027222288,0.000058951435,0.00037655677,0.00031035658,0.12068285],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.999368,0.00020869813,0.000015903048,0.00009732596,0.0001583595,0.00015175597],"domain_scores_gemma":[0.9996884,0.000025990457,0.000018086646,0.00004414671,0.00006729252,0.00015608559],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00085604953,0.0005832932,0.00025395487,0.0012034143,0.005168658,0.0076167,0.00077547744,0.0017337252,0.013821807],"category_scores_gemma":[0.0006823816,0.00030246776,0.00031188587,0.0022468122,0.0067231385,0.0062093935,0.0036912465,0.002791897,0.0012694316],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000056311044,0.000022901579,0.002354731,0.000051732797,0.000015937445,0.00021813436,0.0060570813,0.0015198793,0.0010798187,0.90895444,0.032171305,0.047497742],"study_design_scores_gemma":[0.0000072268876,0.000033363613,0.0046404954,0.0001714712,0.000016097778,0.00024077122,0.008143345,0.0016716652,0.0004383977,0.15954104,0.82506555,0.000030624084],"about_ca_topic_score_codex":0.12679206,"about_ca_topic_score_gemma":0.26658818,"teacher_disagreement_score":0.12679206,"about_ca_system_score_codex":0.01021775,"about_ca_system_score_gemma":0.009469513,"threshold_uncertainty_score":0.2521081},"labels":[],"label_agreement":null},{"id":"W4412690923","doi":"10.22260/isarc2025/0070","title":"Exploring Cognitive Load and Task Complexity in Dynamic Tracking Tasks: Insights for Construction Workflows","year":2025,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workflow; Computer science; Task (project management); Cognitive load; Tracking (education); Cognition; Human–computer interaction; Task analysis; Systems engineering; Engineering; Psychology; Database","score_opus":0.04546509954832691,"score_gpt":0.24639485948442683,"score_spread":0.2009297599360999,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412690923","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97929627,0.00045718325,0.016198052,0.00045369833,0.000010589679,0.00005490881,0.00016194563,0.000079460704,0.0032878087],"genre_scores_gemma":[0.99094826,0.00035733223,0.007905331,0.00003673862,0.000012308596,0.000032701628,0.00015184534,0.00002745831,0.0005280363],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99913305,0.00023863582,0.000056063804,0.00012734674,0.00031182537,0.000133113],"domain_scores_gemma":[0.99391645,0.0035636018,0.001033292,0.00029608127,0.0007590371,0.00043152535],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016452107,0.0008725845,0.0005213641,0.0026719156,0.0007116989,0.0032946405,0.00052520575,0.0005560727,0.0011772952],"category_scores_gemma":[0.008766445,0.00031783193,0.0005886491,0.0017655888,0.00075810496,0.0026768148,0.0014721474,0.0005752553,0.00023456171],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000710354,0.0012549092,0.5921721,0.001240424,0.00024261318,0.0015149708,0.04564357,0.01855299,0.025251376,0.0068899165,0.0015955673,0.3049312],"study_design_scores_gemma":[0.00001860684,0.00038620012,0.8976226,0.0002774891,0.00010058418,0.00040760607,0.023470378,0.05735119,0.0028106696,0.014106589,0.0033121237,0.00013594744],"about_ca_topic_score_codex":0.012177946,"about_ca_topic_score_gemma":0.015555473,"teacher_disagreement_score":0.012177946,"about_ca_system_score_codex":0.0013250514,"about_ca_system_score_gemma":0.0017408967,"threshold_uncertainty_score":0.024214149},"labels":[],"label_agreement":null},{"id":"W4412691132","doi":"10.22260/isarc2025/0208","title":"Mixed Reality-based Digital Twinning of Building Circularity: A Co-Design Approach for Sustainable Buildings","year":2025,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Crystal twinning; Computer science; Architectural engineering; Mixed reality; Augmented reality; Human–computer interaction; Materials science; Engineering; Metallurgy","score_opus":0.019399907699794255,"score_gpt":0.23596424485144865,"score_spread":0.2165643371516544,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412691132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013966234,0.00032497203,0.96284354,0.0006185454,0.000049882437,0.00013496855,0.000028890561,0.0002285158,0.021804342],"genre_scores_gemma":[0.33425295,0.0004843424,0.659073,0.00012692106,0.00001929165,0.00035332175,0.000090912945,0.00012691622,0.0054723336],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9962972,0.0023131818,0.00010444609,0.0003588525,0.0007697454,0.00015665029],"domain_scores_gemma":[0.99785537,0.0010397413,0.00013994444,0.00047573415,0.00031778406,0.00017151226],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041614533,0.0010236772,0.000596343,0.0022247075,0.0011465467,0.0057810163,0.0020136598,0.001213607,0.004679843],"category_scores_gemma":[0.004594206,0.0008082129,0.0011979304,0.0012473743,0.004193812,0.004655066,0.007125712,0.0014353183,0.00052757823],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018502159,0.0003495621,0.0036017492,0.0008183092,0.00019324101,0.00049509766,0.012403187,0.11990009,0.014305108,0.5759687,0.0023290785,0.26945087],"study_design_scores_gemma":[0.00008159316,0.0007065891,0.0030682029,0.00074124685,0.0002453695,0.0010471899,0.015771953,0.4800391,0.020694152,0.3057092,0.17165402,0.00024134091],"about_ca_topic_score_codex":0.0020636192,"about_ca_topic_score_gemma":0.0039493702,"teacher_disagreement_score":0.0057810163,"about_ca_system_score_codex":0.001599893,"about_ca_system_score_gemma":0.0017707943,"threshold_uncertainty_score":0.022008121},"labels":[],"label_agreement":null},{"id":"W4412753985","doi":"10.1080/15623599.2025.2538690","title":"BIM adoption and implementation in the civil and transportation infrastructure sector: analysis of governmental roadmaps and action plans","year":2025,"lang":"en","type":"article","venue":"International Journal of Construction Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Action (physics); Business; Civil infrastructure; Process management; Engineering; Transport engineering; Risk analysis (engineering)","score_opus":0.004048248722485261,"score_gpt":0.2410887364556989,"score_spread":0.23704048773321362,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412753985","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98262113,0.0002359281,0.0022570773,0.0005506855,0.000007494784,0.00031458447,0.00053583295,0.00003364126,0.013443652],"genre_scores_gemma":[0.9897989,0.00040866833,0.007822519,0.000055630215,0.0000019212612,0.00028192546,0.0007580016,0.000020066986,0.0008525375],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.9906246,0.005275622,0.0007378948,0.0005701261,0.0019884345,0.0008033549],"domain_scores_gemma":[0.97533685,0.01487391,0.0036587825,0.0014670491,0.0042609586,0.00040248834],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.012683387,0.00020403381,0.00021502197,0.007673169,0.0015225505,0.003553507,0.000601315,0.00055946293,0.0011803],"category_scores_gemma":[0.030321755,0.000349187,0.00036314616,0.013287434,0.0017450001,0.0033012265,0.0019701677,0.0006359614,0.0002476644],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015422358,0.00043025892,0.30006012,0.0013463921,0.00008105332,0.0008323401,0.34608486,0.004738026,0.0025660628,0.03605812,0.004244892,0.30340362],"study_design_scores_gemma":[0.000011715956,0.00017870552,0.4049016,0.00077725557,0.00006452939,0.00022821575,0.5455735,0.006358306,0.002407294,0.003985019,0.035435256,0.00007874559],"about_ca_topic_score_codex":0.021164417,"about_ca_topic_score_gemma":0.029273486,"teacher_disagreement_score":0.021164417,"about_ca_system_score_codex":0.008711771,"about_ca_system_score_gemma":0.011087087,"threshold_uncertainty_score":0.06707698},"labels":[],"label_agreement":null},{"id":"W4412754668","doi":"10.11159/iccste25.106","title":"An Investigation of the contribution of 4IR to Competencies of Architects","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"University of Johannesburg","keywords":"Computer science; Engineering","score_opus":0.008134488648865706,"score_gpt":0.20565334457553722,"score_spread":0.1975188559266715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754668","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.90777653,0.0005023914,0.006026898,0.0019521934,0.000034508972,0.0000984131,0.000050655533,0.000032674867,0.08352558],"genre_scores_gemma":[0.99483734,0.00022630395,0.0025611105,0.00011869478,0.000003934293,0.000024442877,0.000015828218,0.000004880168,0.0022075144],"study_design_codex":"design_other","study_design_gemma":"qualitative","domain_scores_codex":[0.99510527,0.0027614816,0.00017982184,0.00024515175,0.0008950925,0.00081312004],"domain_scores_gemma":[0.9793267,0.012361455,0.00220144,0.0010406867,0.0031403895,0.0019292434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006440357,0.00025833008,0.00021769381,0.001970841,0.0014394274,0.002728813,0.00059324206,0.00043664957,0.0052818097],"category_scores_gemma":[0.01881775,0.00026584524,0.0002340684,0.001038584,0.0025021122,0.002612743,0.003475835,0.0009846208,0.0004406277],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00024735942,0.0005581326,0.2556418,0.0015225471,0.000047078647,0.0021223594,0.30900654,0.0018194527,0.007629601,0.07988872,0.0026914668,0.33882496],"study_design_scores_gemma":[0.000025739619,0.0006309011,0.3451829,0.0013743857,0.00008139523,0.0020182077,0.51963055,0.004416364,0.006999164,0.011265592,0.108264364,0.00011042979],"about_ca_topic_score_codex":0.0069205286,"about_ca_topic_score_gemma":0.014101941,"teacher_disagreement_score":0.0069205286,"about_ca_system_score_codex":0.0031014432,"about_ca_system_score_gemma":0.007505177,"threshold_uncertainty_score":0.03406024},"labels":[],"label_agreement":null},{"id":"W4412754711","doi":"10.11159/iccste25.184","title":"BIM Methodology and Montecarlo Analysis as Mitigation Tools of Construction Cost Overrun","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cost overrun; Computer science; Monte Carlo method; Construction engineering; Engineering; Construction industry; Mathematics","score_opus":0.020200943834355972,"score_gpt":0.24829239973654943,"score_spread":0.22809145590219346,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754711","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016734032,0.00068085594,0.9722034,0.00016799285,0.00004320499,0.00012919321,0.000115125324,0.0004725919,0.00945366],"genre_scores_gemma":[0.34397808,0.0009601403,0.65173775,0.000089957204,0.000041578554,0.00038296488,0.00020715142,0.00022643962,0.0023759634],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9950317,0.0022519368,0.00018581057,0.00030776745,0.0020798717,0.00014300317],"domain_scores_gemma":[0.9924049,0.005291722,0.00078916235,0.0005051554,0.0009268008,0.00008219544],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007033555,0.0011549774,0.0008486766,0.008047705,0.00067262107,0.0024997497,0.0011850767,0.00085517555,0.003872226],"category_scores_gemma":[0.015181105,0.00070815574,0.0009852805,0.0039059361,0.0009991418,0.0025387495,0.001501393,0.00092674274,0.00060777523],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001700427,0.00022087387,0.009640586,0.0006973961,0.00026493074,0.00020508932,0.0008176599,0.36085814,0.005135756,0.14809877,0.0024880907,0.47140265],"study_design_scores_gemma":[0.000027188767,0.00015508065,0.0072956937,0.00031589146,0.00010246559,0.0004487452,0.00046848456,0.9076513,0.0064870245,0.05490638,0.021993881,0.00014785385],"about_ca_topic_score_codex":0.0025056158,"about_ca_topic_score_gemma":0.0047680014,"teacher_disagreement_score":0.008047705,"about_ca_system_score_codex":0.001401407,"about_ca_system_score_gemma":0.0018521027,"threshold_uncertainty_score":0.03719747},"labels":[],"label_agreement":null},{"id":"W4412754712","doi":"10.11159/iccste25.303","title":"Development and Analysis of Five-Dimensional BIM in Construction Management, Case Study – Multifamily Housing","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Architectural engineering; Computer science; Construction engineering; Engineering","score_opus":0.011465922727158321,"score_gpt":0.22446736060770306,"score_spread":0.21300143788054474,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754712","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.80507785,0.0005244897,0.13247404,0.0010470928,0.000027576987,0.0007068767,0.00036950526,0.0001964244,0.05957617],"genre_scores_gemma":[0.8195817,0.00038073212,0.17657243,0.000037155616,0.0000042795045,0.00021968725,0.00019598512,0.000029584897,0.0029783403],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981475,0.0009602784,0.000075823744,0.000099635545,0.0005741558,0.00014275387],"domain_scores_gemma":[0.998616,0.00068293296,0.00010354778,0.00014376229,0.00038146088,0.00007227388],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0027246275,0.0003394796,0.00017667335,0.0018844429,0.001036036,0.0018064056,0.00079626276,0.0007475997,0.0020984705],"category_scores_gemma":[0.0037558596,0.0003404243,0.00037491586,0.002242995,0.000855888,0.0015005419,0.0016746512,0.00045130227,0.0002847258],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032360677,0.002002742,0.09304029,0.0012045945,0.00009043855,0.004577686,0.024168767,0.21171069,0.02152914,0.1577872,0.00453103,0.47903386],"study_design_scores_gemma":[0.00006747453,0.0009314735,0.0940666,0.00089286006,0.00013733754,0.0025481833,0.050837293,0.6821583,0.03324406,0.016542342,0.118409246,0.00016485534],"about_ca_topic_score_codex":0.009572379,"about_ca_topic_score_gemma":0.017525643,"teacher_disagreement_score":0.009572379,"about_ca_system_score_codex":0.0021093185,"about_ca_system_score_gemma":0.0021688514,"threshold_uncertainty_score":0.019033313},"labels":[],"label_agreement":null},{"id":"W4412754729","doi":"10.11159/iccste25.330","title":"Towards Sustainable Construction: A Simulation-Driven Evaluation of a 3D-Printed Building for DGNB Certification","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Certification; 3d printed; Computer science; Architectural engineering; Construction engineering; Construction industry; Systems engineering; Manufacturing engineering; Engineering management; Engineering; Management","score_opus":0.020527819179698047,"score_gpt":0.2636622341842568,"score_spread":0.2431344150045588,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754729","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96476096,0.00007062879,0.02197281,0.00010819223,0.00003733764,0.00039589792,0.0010559997,0.00037005532,0.011228009],"genre_scores_gemma":[0.979107,0.000069086076,0.01838088,0.000019175126,0.000002759369,0.00016740426,0.00056323403,0.000052947355,0.0016374296],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99932694,0.00021981781,0.00002255236,0.000048397706,0.0003185047,0.000063737825],"domain_scores_gemma":[0.99928325,0.00034420958,0.000043809632,0.00010290116,0.00016055246,0.00006523851],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010607718,0.000706477,0.00047190816,0.0005937693,0.0003648604,0.0012677357,0.0009947702,0.0009637654,0.0031038385],"category_scores_gemma":[0.0015950934,0.00026071063,0.0006698495,0.0004195745,0.00072358246,0.0004371471,0.00069714227,0.0006998493,0.0003989808],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00044168922,0.0007559824,0.004812203,0.00021027577,0.000034886667,0.00023185063,0.00037262234,0.954224,0.019581363,0.0022830162,0.0007253995,0.016326752],"study_design_scores_gemma":[0.00009793834,0.0012883615,0.005185837,0.000042958996,0.000031130243,0.000077805984,0.00036329197,0.9618228,0.027103465,0.00082482304,0.003123229,0.000038315986],"about_ca_topic_score_codex":0.006219606,"about_ca_topic_score_gemma":0.0069942377,"teacher_disagreement_score":0.006219606,"about_ca_system_score_codex":0.001352443,"about_ca_system_score_gemma":0.0007703809,"threshold_uncertainty_score":0.012366772},"labels":[],"label_agreement":null},{"id":"W4412754754","doi":"10.11159/iccste25.241","title":"Life Cycle Assessment of Cementitious Bricks","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Cementitious; Life-cycle assessment; Environmental science; Materials science; Metallurgy; Cement; Production (economics); Economics","score_opus":0.008366653289240474,"score_gpt":0.22569857243019234,"score_spread":0.21733191914095187,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754754","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9635691,0.0007067968,0.028472058,0.000037151865,0.000009614719,0.00015871483,0.0015776976,0.00007253878,0.0053963144],"genre_scores_gemma":[0.99142367,0.0003017686,0.0058303713,0.000007658252,0.000001027381,0.000089201436,0.0008527878,0.000015660828,0.0014779423],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999777,0.000056971432,0.0000103637085,0.000031183015,0.00009054474,0.00003392822],"domain_scores_gemma":[0.99961483,0.00013733526,0.000048577214,0.000024929119,0.00015667554,0.000017507555],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073754037,0.00043938195,0.00028783566,0.0013381571,0.00027980228,0.00048282812,0.00037609343,0.00036541646,0.0015939061],"category_scores_gemma":[0.0008246719,0.00016679554,0.0007983179,0.00081758766,0.000176822,0.00039380038,0.00030724646,0.00023038764,0.00022813007],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002326887,0.0001549667,0.023640817,0.00025415688,0.00007852641,0.00021835395,0.00011010101,0.8859801,0.04877784,0.0026025057,0.0002767612,0.03767306],"study_design_scores_gemma":[0.000016590855,0.000850843,0.023388341,0.00003405667,0.00007505645,0.00008505756,0.00017412812,0.9202725,0.04865653,0.002851953,0.0035548075,0.0000401451],"about_ca_topic_score_codex":0.012532404,"about_ca_topic_score_gemma":0.010754047,"teacher_disagreement_score":0.012532404,"about_ca_system_score_codex":0.0011909158,"about_ca_system_score_gemma":0.00071810023,"threshold_uncertainty_score":0.024918914},"labels":[],"label_agreement":null},{"id":"W4412754814","doi":"10.11159/iccste25.182","title":"Benefits of Last Planner System and Asana Integration in Improving Finish Planning","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Planner; Computer science; Engineering; Artificial intelligence","score_opus":0.00927032829785801,"score_gpt":0.20196071480083178,"score_spread":0.19269038650297377,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754814","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.055776164,0.0004408917,0.9211659,0.0006080308,0.00016624382,0.00031818548,0.00014427875,0.004983882,0.016396431],"genre_scores_gemma":[0.24778076,0.00015910862,0.74741036,0.00010144325,0.000048483158,0.00022571362,0.00023795271,0.00024441985,0.0037917113],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9966371,0.0013995359,0.00019691058,0.00035155856,0.0012164784,0.00019844662],"domain_scores_gemma":[0.99658316,0.001359697,0.00032303456,0.0005887075,0.0008801304,0.0002653019],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002499343,0.001046453,0.0005645913,0.0015976751,0.0007898287,0.0017319658,0.0011756321,0.00097519293,0.0060635684],"category_scores_gemma":[0.0051530236,0.00069391093,0.00076019595,0.0011451795,0.00052712933,0.0030053928,0.0025522886,0.0012503249,0.0013504473],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00056618283,0.00061553414,0.009613747,0.00052647974,0.00013655082,0.00031645602,0.0020481579,0.1080425,0.03416313,0.018519824,0.0052640615,0.82018733],"study_design_scores_gemma":[0.0002758673,0.0019926687,0.017954897,0.00045588007,0.00055694795,0.0009942442,0.002392975,0.6892436,0.05167142,0.015470939,0.21864523,0.00034528298],"about_ca_topic_score_codex":0.0034371482,"about_ca_topic_score_gemma":0.0062383227,"teacher_disagreement_score":0.0060635684,"about_ca_system_score_codex":0.0005568221,"about_ca_system_score_gemma":0.0025770147,"threshold_uncertainty_score":0.020284712},"labels":[],"label_agreement":null},{"id":"W4412754856","doi":"10.11159/iccste25.258","title":"Seismic Vulnerability Assessment Using FEMA P-154 and Welded Mesh Reinforcement in Informal Settlements in Peru","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Vulnerability (computing); Informal settlements; Welding; Vulnerability assessment; Human settlement; Geology; Settlement (finance); Forensic engineering; Seismology; Reinforcement; Engineering; Computer science; Computer security; Structural engineering; Mechanical engineering; World Wide Web; Waste management; Economic growth; Medicine","score_opus":0.012701826992454202,"score_gpt":0.24750565541482067,"score_spread":0.23480382842236647,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754856","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9972602,0.000023179682,0.0017150366,0.000009495311,4.2563147e-7,0.000011701216,0.00005269534,0.000022972816,0.00090404955],"genre_scores_gemma":[0.9988404,0.000018453018,0.000844645,0.000001070349,4.8394486e-7,0.0000117868085,0.00005206663,0.000002581853,0.00022851494],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9998252,0.00006917664,0.0000075656344,0.000023457871,0.00004347573,0.000031201114],"domain_scores_gemma":[0.99978966,0.00007778619,0.000044015935,0.00002009558,0.000051829527,0.000016645083],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00035730514,0.00032909936,0.00017621105,0.0013084831,0.0002435935,0.00036952744,0.0002970457,0.00032398212,0.001286091],"category_scores_gemma":[0.0009691714,0.00017520598,0.00019570661,0.0008318433,0.000286815,0.0002826548,0.00062929484,0.000090821624,0.00015868206],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003957335,0.00027527547,0.7791176,0.0002422833,0.00012495236,0.0023975251,0.004238942,0.10806027,0.021855861,0.0014661776,0.00047823205,0.08134717],"study_design_scores_gemma":[0.000018667415,0.0004838246,0.8271938,0.000041944364,0.00007381712,0.00055543496,0.006296148,0.16022323,0.0026740986,0.00061725004,0.0017908709,0.00003088133],"about_ca_topic_score_codex":0.008676535,"about_ca_topic_score_gemma":0.017778533,"teacher_disagreement_score":0.008676535,"about_ca_system_score_codex":0.00033200107,"about_ca_system_score_gemma":0.00019120274,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W4412754898","doi":"10.11159/iccste25.248","title":"Design Of Building In Area Susceptible To Slide Failure","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.011840735047658438,"score_gpt":0.21509766776250677,"score_spread":0.20325693271484835,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754898","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.3504959,0.0004763395,0.59988993,0.00016905741,0.000094275434,0.000562015,0.00045902666,0.0022401328,0.04561336],"genre_scores_gemma":[0.8860481,0.00023160707,0.10260071,0.00001943221,0.000011199942,0.00028714002,0.00032116153,0.00015081413,0.010329852],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99973375,0.000063425956,0.000016599703,0.000045905952,0.00008386435,0.000056411624],"domain_scores_gemma":[0.99987125,0.000014267135,0.000023662726,0.00001761143,0.000044318134,0.00002884818],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00025031916,0.00073621806,0.00041133605,0.0010004272,0.00042321312,0.0007856183,0.00085830013,0.00042688366,0.008692159],"category_scores_gemma":[0.00036690876,0.00029221075,0.00042743664,0.00031338274,0.00029472186,0.0003206402,0.0008023381,0.00018468927,0.0015068401],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047400277,0.00028851733,0.013625404,0.00070948864,0.000065684864,0.0020321473,0.0006991498,0.61344624,0.12917812,0.014227633,0.003905099,0.22134846],"study_design_scores_gemma":[0.00010090209,0.0020255982,0.02799232,0.00014487533,0.0002330059,0.0021074503,0.0014728308,0.88234115,0.026534474,0.007419831,0.049529057,0.00009844473],"about_ca_topic_score_codex":0.0015724353,"about_ca_topic_score_gemma":0.0029081865,"teacher_disagreement_score":0.008692159,"about_ca_system_score_codex":0.0002699513,"about_ca_system_score_gemma":0.00049136154,"threshold_uncertainty_score":0.029078126},"labels":[],"label_agreement":null},{"id":"W4412754899","doi":"10.11159/iccste25.001","title":"Geopolymer Concrete from Construction and Demolition Waste: A Sustainable Solution for Carbon Emission Reduction","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Demolition; Demolition waste; Geopolymer cement; Waste management; Reduction (mathematics); Geopolymer; Carbon fibers; Environmental science; Materials science; Civil engineering; Engineering; Fly ash; Composite material; Composite number","score_opus":0.006740955992634297,"score_gpt":0.2021099113869328,"score_spread":0.1953689553942985,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754899","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.24415688,0.50506973,0.14660026,0.008651785,0.0011769854,0.00023167202,0.00054710585,0.00054424163,0.09302137],"genre_scores_gemma":[0.6466414,0.2809549,0.042839717,0.0006814055,0.0003321402,0.000106432286,0.00042811787,0.00008706265,0.027928794],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9997123,0.0000298776,0.000011609338,0.00003570653,0.00017433359,0.000036134246],"domain_scores_gemma":[0.9999254,0.000011755885,0.000020028048,0.000005552081,0.000027512422,0.000009705606],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028087778,0.00049255945,0.0005001959,0.001105898,0.00035058527,0.0013544054,0.00038549927,0.0010467981,0.0022532598],"category_scores_gemma":[0.00017892012,0.00024149423,0.0004039272,0.001130606,0.00037883339,0.0014881408,0.00084912876,0.00097584963,0.0008352968],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010673904,0.00023870559,0.0013876533,0.006529875,0.00010470197,0.0007374031,0.00023356185,0.012071088,0.47474745,0.06503684,0.0057105618,0.43309543],"study_design_scores_gemma":[0.000030657833,0.0004015479,0.003159933,0.0014052559,0.00016084281,0.0011681191,0.00059546216,0.016777165,0.3968066,0.028765213,0.55063355,0.0000956535],"about_ca_topic_score_codex":0.000737072,"about_ca_topic_score_gemma":0.0031306767,"teacher_disagreement_score":0.0022532598,"about_ca_system_score_codex":0.0007164836,"about_ca_system_score_gemma":0.0011470283,"threshold_uncertainty_score":0.0075379014},"labels":[],"label_agreement":null},{"id":"W4412754900","doi":"10.11159/iccste25.236","title":"BIM-based Model Applied in the Analysis of Fire Simulation and Evacuation of a Building","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Architectural engineering; Engineering","score_opus":0.012723518863840664,"score_gpt":0.23572196682768465,"score_spread":0.222998447963844,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754900","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.20046927,0.0005239967,0.7501142,0.0004354656,0.00026607612,0.00018356154,0.0026639784,0.0025624947,0.042780954],"genre_scores_gemma":[0.93384266,0.00060400873,0.055639125,0.000056968478,0.000024772555,0.00022599776,0.0016535635,0.00016872781,0.0077840914],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99978644,0.0000438846,0.000013788348,0.000029750043,0.00009079799,0.0000353399],"domain_scores_gemma":[0.99983776,0.000050165167,0.000015436855,0.000017918748,0.00006317628,0.000015441596],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002665081,0.00060330273,0.00053718296,0.0008833244,0.00061784894,0.0010366816,0.00081269996,0.00086019916,0.005765779],"category_scores_gemma":[0.00066364324,0.00043184453,0.0009595668,0.0009649883,0.00032585184,0.0008296406,0.000668572,0.00054131565,0.00080201594],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000030736126,0.00004023822,0.0018365205,0.000069706126,0.000017341748,0.00012652435,0.000073095995,0.981872,0.0017189868,0.0045181853,0.000721054,0.0089754965],"study_design_scores_gemma":[0.0000050993767,0.000012330781,0.00064705143,0.000010371326,0.000010312436,0.000033409488,0.000040789313,0.9954572,0.0007878368,0.0010137131,0.0019731198,0.000008703567],"about_ca_topic_score_codex":0.020307118,"about_ca_topic_score_gemma":0.0150887985,"teacher_disagreement_score":0.020307118,"about_ca_system_score_codex":0.00062726095,"about_ca_system_score_gemma":0.0013032964,"threshold_uncertainty_score":0.040377855},"labels":[],"label_agreement":null},{"id":"W4412754950","doi":"10.11159/iccste25.315","title":"Procedure to Ensure On-Time Delivery of Materials in Multifamily Housing Construction Projects Using Just-In-Time and Kitting In Small Construction","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Computer science; Transport engineering; Architectural engineering; Engineering","score_opus":0.013696741716998499,"score_gpt":0.21374784208120048,"score_spread":0.20005110036420198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412754950","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45941988,0.000391584,0.36309522,0.0012616453,0.0003935118,0.12937976,0.0015895728,0.0017261052,0.042742796],"genre_scores_gemma":[0.28641775,0.0005110864,0.646231,0.00034353827,0.000078140416,0.048530336,0.00081406167,0.00014287738,0.016931185],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99368894,0.0027640755,0.00071671454,0.0009010264,0.0014738734,0.00045536598],"domain_scores_gemma":[0.98717195,0.0045156186,0.0013794185,0.0016003306,0.004571582,0.0007609947],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009177051,0.000693059,0.00045990615,0.0018477917,0.0021152364,0.0010819167,0.0012653545,0.0009583073,0.012650403],"category_scores_gemma":[0.015970374,0.00047417625,0.0006014526,0.001089222,0.0011543313,0.0009972109,0.001425805,0.0012258955,0.0039249817],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0020957072,0.0054578246,0.016917938,0.0033942498,0.000029942023,0.0033000198,0.057281904,0.003304307,0.14792165,0.0123842945,0.011820416,0.7360918],"study_design_scores_gemma":[0.0011018312,0.027311735,0.21054535,0.0028202336,0.00018819899,0.003950194,0.10137776,0.019382525,0.2557578,0.0132602565,0.36320844,0.0010956115],"about_ca_topic_score_codex":0.0017266703,"about_ca_topic_score_gemma":0.0029832614,"teacher_disagreement_score":0.012650403,"about_ca_system_score_codex":0.00110032,"about_ca_system_score_gemma":0.0068867253,"threshold_uncertainty_score":0.04853344},"labels":[],"label_agreement":null},{"id":"W4412755054","doi":"10.11159/iccste25.326","title":"Development of an Integrated Enterprise Asset Management System for Enhancing Industrial Resources Lifecycle in the Construction Industry","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"System lifecycle; Asset (computer security); Business; Asset management; Application lifecycle management; Enterprise life cycle; Process management; Computer science; Engineering management; Product lifecycle; Engineering; Finance; Computer security; New product development","score_opus":0.0129099603932208,"score_gpt":0.2189082281786848,"score_spread":0.205998267785464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412755054","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14013599,0.00024320827,0.8312665,0.00022569888,0.00007805354,0.0003790719,0.00027677396,0.015372733,0.01202198],"genre_scores_gemma":[0.61043596,0.00021082915,0.3825833,0.00009854712,0.000018717292,0.00021350342,0.00069439394,0.00020533145,0.005539442],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999671,0.000047945246,0.000023054894,0.00006798477,0.00014660209,0.000043513362],"domain_scores_gemma":[0.99972576,0.000043675194,0.000024481273,0.00005235997,0.00011562057,0.000038114416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005556846,0.00028585322,0.00030122083,0.00058397715,0.00029690188,0.00080739666,0.000596968,0.00039747788,0.0022818693],"category_scores_gemma":[0.0006979696,0.00018933738,0.0002524865,0.00040649326,0.00014768771,0.0010093008,0.0008600107,0.0004252483,0.00075678434],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004066199,0.000768348,0.013334453,0.0003123454,0.00009678657,0.0006861256,0.0008316595,0.05309675,0.12933657,0.011309629,0.00868901,0.7811318],"study_design_scores_gemma":[0.00013631102,0.00071431504,0.017648648,0.00014141158,0.0001610116,0.0006738614,0.0004021536,0.7906665,0.105496235,0.0031965817,0.08066062,0.00010236189],"about_ca_topic_score_codex":0.0015880262,"about_ca_topic_score_gemma":0.0016477251,"teacher_disagreement_score":0.0022818693,"about_ca_system_score_codex":0.0003570309,"about_ca_system_score_gemma":0.0011310929,"threshold_uncertainty_score":0.0076336265},"labels":[],"label_agreement":null},{"id":"W4412755064","doi":"10.11159/iccste25.189","title":"Reducing Subcontractor Progress Monitoring Time on Multifamily Building Finishes Using a BIM-Based","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Civil, Structural and Transportation Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Computer science; Architectural engineering; Systems engineering; Engineering; Operations management","score_opus":0.013083728300053235,"score_gpt":0.234558365395332,"score_spread":0.22147463709527876,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412755064","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7094057,0.00012368843,0.28297547,0.000103519065,0.00002424372,0.00023934599,0.00025190375,0.001938646,0.0049373843],"genre_scores_gemma":[0.8237726,0.000079831036,0.17402545,0.000016704253,0.000006471771,0.00012927566,0.00030702705,0.00010024043,0.0015624391],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99741757,0.00071333785,0.000079381025,0.00029941858,0.0013190064,0.00017131836],"domain_scores_gemma":[0.99636334,0.001072869,0.0007606983,0.0007736095,0.0008924402,0.0001371317],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017756645,0.0009336215,0.0005806689,0.0018745332,0.000532879,0.00079909805,0.0009827553,0.00045163275,0.001799913],"category_scores_gemma":[0.004018835,0.00041824812,0.00042492998,0.0011896681,0.00032837945,0.0012118905,0.0012460586,0.00035692082,0.0006005158],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00075352873,0.0007891071,0.042131957,0.00028000085,0.00005854007,0.0002240044,0.0016984806,0.0857367,0.099431746,0.0016995774,0.001402819,0.7657935],"study_design_scores_gemma":[0.00009080887,0.0019645223,0.15586443,0.00008072881,0.00012806397,0.00035755942,0.0021251733,0.6998828,0.12598228,0.0016768518,0.0116889095,0.0001579284],"about_ca_topic_score_codex":0.0048103663,"about_ca_topic_score_gemma":0.009800859,"teacher_disagreement_score":0.0048103663,"about_ca_system_score_codex":0.000532748,"about_ca_system_score_gemma":0.001311606,"threshold_uncertainty_score":0.009564698},"labels":[],"label_agreement":null},{"id":"W4412819532","doi":"10.1007/978-3-031-89033-8_3","title":"Building Software","year":2025,"lang":"en","type":"book-chapter","venue":"CMS/CAIMS books in mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Saskatchewan","funders":"","keywords":"Computer science","score_opus":0.012498499634262968,"score_gpt":0.2184220625838103,"score_spread":0.20592356294954733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412819532","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0021783754,0.0010372596,0.101436295,0.00059525506,0.00019108813,0.000040743253,0.0005186547,0.0043829265,0.88961935],"genre_scores_gemma":[0.039813686,0.0021480545,0.06289799,0.00042553328,0.00007806333,0.00010434558,0.002899387,0.0023497813,0.88928324],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99961436,0.000049172777,0.000014736128,0.000058033926,0.00023505803,0.000028482398],"domain_scores_gemma":[0.99980205,0.000045403147,0.000006010527,0.00007473808,0.000054654785,0.00001713339],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00029965435,0.00074269605,0.0003193829,0.0010646974,0.0007197281,0.0027064867,0.0009039905,0.0006912648,0.109687194],"category_scores_gemma":[0.0009811219,0.00045226995,0.00040799804,0.0014107474,0.00070193154,0.0025283007,0.0017674378,0.00094566675,0.053149033],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000013924238,0.000030563366,0.00025433852,0.00017942984,0.000010416348,0.00008833207,0.00070273754,0.0026932056,0.0028896686,0.36254215,0.15909839,0.47149685],"study_design_scores_gemma":[0.0000024811413,0.0000075233447,0.00017958673,0.000055993565,0.000004374247,0.00010038983,0.00010790201,0.0020047373,0.001025687,0.04573909,0.9507657,0.000006578764],"about_ca_topic_score_codex":0.0024396298,"about_ca_topic_score_gemma":0.0043663355,"teacher_disagreement_score":0.109687194,"about_ca_system_score_codex":0.00072804483,"about_ca_system_score_gemma":0.0007319173,"threshold_uncertainty_score":0.3669402},"labels":[],"label_agreement":null},{"id":"W4412870792","doi":"10.24908/pceea.2025.19671","title":"Transit Engineering &amp; Planning: Needs and Perspectives in Canada","year":2025,"lang":"en","type":"article","venue":"Proceedings of the Canadian Engineering Education Association (CEEA)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"York University","funders":"York University","keywords":"Transit (satellite); Business; Transport engineering; Engineering; Public transport","score_opus":0.005622392216677101,"score_gpt":0.17772061192513053,"score_spread":0.17209821970845343,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412870792","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.589676,0.020156188,0.0013871678,0.18986371,0.00055798015,0.00016671217,0.0020461087,0.000112095535,0.19603394],"genre_scores_gemma":[0.95438063,0.018652009,0.0018558332,0.006275255,0.00005007446,0.00003301237,0.0005693781,0.000049502403,0.018134164],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99600005,0.00036134684,0.000109982495,0.00021184624,0.001518176,0.001798636],"domain_scores_gemma":[0.98729044,0.0012252963,0.00042941305,0.00007897689,0.0058103018,0.005165493],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003079264,0.00031498403,0.00037412523,0.0023744104,0.017086232,0.007977086,0.0018533841,0.0016214177,0.009151026],"category_scores_gemma":[0.005091848,0.00041973693,0.0003251806,0.0076258704,0.0040206085,0.0018911464,0.002834087,0.0026040992,0.0004952387],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000277186,0.0005812743,0.18887164,0.0019632922,0.00006566082,0.0054799444,0.24299885,0.0031001691,0.0018437023,0.044149227,0.16093692,0.34973216],"study_design_scores_gemma":[0.000016494658,0.00008176892,0.09978816,0.0011801295,0.000037122893,0.0007430514,0.5863468,0.0013531593,0.00041182982,0.002471791,0.30744833,0.00012141289],"about_ca_topic_score_codex":0.99271363,"about_ca_topic_score_gemma":0.99685585,"teacher_disagreement_score":0.89493734,"about_ca_system_score_codex":0.10506267,"about_ca_system_score_gemma":0.27097958,"threshold_uncertainty_score":0.7622866},"labels":[],"label_agreement":null},{"id":"W4412916416","doi":"10.5614/jts.2025.32.1.10","title":"Systematic Literature Riview: Peranan metode BIM dalam Integrated Project Delivery (IPD) untuk Mengoptimalkan Konstruktabilitas Proyek","year":2025,"lang":"id","type":"article","venue":"Jurnal Teknik Sipil","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Encana (Canada)","funders":"","keywords":"Operating system; Computer science","score_opus":0.006931432229120676,"score_gpt":0.22900793349365,"score_spread":0.22207650126452932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4412916416","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020364646,0.9498554,0.004509134,0.015770473,0.004518631,0.007943463,0.008303394,0.000260636,0.0068024336],"genre_scores_gemma":[0.035922866,0.9099392,0.0159114,0.013811439,0.0022729677,0.01459822,0.0040886425,0.00012760743,0.0033276237],"study_design_codex":"systematic_review","study_design_gemma":"systematic_review","domain_scores_codex":[0.9539059,0.016716002,0.015670206,0.0031799283,0.009613529,0.0009145355],"domain_scores_gemma":[0.82111317,0.1280873,0.02481157,0.005758017,0.018506873,0.0017230137],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.033725988,0.0020336988,0.005800439,0.029860351,0.0013411726,0.006907383,0.0026544605,0.0041547776,0.016181549],"category_scores_gemma":[0.15574038,0.0014661513,0.0054369722,0.016894808,0.001886689,0.0061790855,0.0042824824,0.0027287262,0.0024358786],"study_design_candidate":"systematic_review","study_design_consensus":"systematic_review","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007445251,0.000020622432,0.0007008678,0.9249618,0.0020287856,0.00016760107,0.000672294,0.00013905196,0.0003668632,0.0018757842,0.012819422,0.056172494],"study_design_scores_gemma":[0.00008004205,0.00005495861,0.001332243,0.92874163,0.006195937,0.00021536156,0.00076007727,0.000107264714,0.00029063207,0.0021780846,0.059999913,0.0000438721],"about_ca_topic_score_codex":0.0067832596,"about_ca_topic_score_gemma":0.013611275,"teacher_disagreement_score":0.033725988,"about_ca_system_score_codex":0.0069166394,"about_ca_system_score_gemma":0.03795391,"threshold_uncertainty_score":0.17836225},"labels":[],"label_agreement":null},{"id":"W4413135109","doi":"10.1139/dsa-2025-0001","title":"AIoT-powered drones in the construction industry: a review","year":2025,"lang":"en","type":"review","venue":"Drone Systems and Applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scopus; Drone; Nexus (standard); China; Leverage (statistics); Construction industry; Web of science; Systematic review; Engineering; Knowledge management; Data science; Political science; Computer science; Construction engineering; Artificial intelligence","score_opus":0.01695594502951816,"score_gpt":0.2791377002637914,"score_spread":0.2621817552342733,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413135109","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00016269872,0.9993113,0.000059473543,0.00012516025,0.00005069254,0.000017443715,0.000038163642,0.0000026555365,0.00023239444],"genre_scores_gemma":[0.0014108397,0.99818194,0.000156618,0.00011611954,0.00003051156,0.000021602558,0.000028806224,0.0000012135532,0.000052320313],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982817,0.0004462133,0.00058626174,0.0001750402,0.00044293722,0.00006789974],"domain_scores_gemma":[0.9893895,0.0078043095,0.0013521606,0.00014457993,0.0011644937,0.00014504892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031557577,0.0009950541,0.0024742926,0.010321,0.00051423925,0.0020361624,0.0012724786,0.0016606024,0.0038563213],"category_scores_gemma":[0.011414965,0.0006545185,0.0032927792,0.009829252,0.0005320916,0.0020665133,0.0011170071,0.0010530454,0.00051232404],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000091910886,0.000050285646,0.00069559267,0.6821932,0.0018487311,0.00017812278,0.0003104548,0.00025595346,0.00037698273,0.0015044977,0.005976653,0.30651754],"study_design_scores_gemma":[0.000051866107,0.0002467887,0.005056021,0.68762904,0.016393835,0.0014332661,0.00062918034,0.00017329543,0.0004670248,0.0016962639,0.28615892,0.00006452693],"about_ca_topic_score_codex":0.0058540357,"about_ca_topic_score_gemma":0.01589109,"teacher_disagreement_score":0.010321,"about_ca_system_score_codex":0.0015782372,"about_ca_system_score_gemma":0.008190098,"threshold_uncertainty_score":0.01668942},"labels":[],"label_agreement":null},{"id":"W4413185976","doi":"10.1139/cjce-2025-0139","title":"Elevating immersive construction training with high-fidelity haptic feedback for human–robot collaboration","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Haptic technology; Computer science; Fidelity; Training (meteorology); Virtual reality; Human–robot interaction; Human–computer interaction; High fidelity; Robot; Simulation; Engineering; Artificial intelligence","score_opus":0.008221356288865103,"score_gpt":0.1982541311083901,"score_spread":0.190032774819525,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413185976","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.45690724,0.0004700352,0.5350859,0.00027143155,0.00010215005,0.00037990176,0.00007239524,0.0013567294,0.005354232],"genre_scores_gemma":[0.83831245,0.00026173025,0.15935086,0.000114268994,0.000025886226,0.0002596298,0.00005209172,0.00007078469,0.0015523273],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9993339,0.00025271488,0.000034954883,0.00006105245,0.00025095424,0.00006640904],"domain_scores_gemma":[0.99842095,0.0010942456,0.000114103066,0.00013656831,0.0001404508,0.000093664145],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010462168,0.0005445026,0.00031331283,0.00035059164,0.0002388683,0.00074083346,0.0006772278,0.00059217244,0.004026859],"category_scores_gemma":[0.0039735357,0.00028749584,0.00033210777,0.00015795564,0.00051225274,0.000910174,0.0020786636,0.000481434,0.00047334126],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085145666,0.0017008967,0.0040900037,0.0016100525,0.000085602536,0.00076072436,0.005439377,0.025334496,0.64660215,0.0031715655,0.0017756004,0.30857795],"study_design_scores_gemma":[0.0008507897,0.015438214,0.07000684,0.0011928402,0.00041792917,0.0054567195,0.004539824,0.41797727,0.4165022,0.008137933,0.058834445,0.00064506556],"about_ca_topic_score_codex":0.00044229522,"about_ca_topic_score_gemma":0.0009645108,"teacher_disagreement_score":0.004026859,"about_ca_system_score_codex":0.00012990789,"about_ca_system_score_gemma":0.00030153806,"threshold_uncertainty_score":0.013471186},"labels":[],"label_agreement":null},{"id":"W4413186082","doi":"10.55016/ojs/cdm.v5i2.61945","title":"Polytopes derived from sporadic simple groups","year":2010,"lang":"en","type":"article","venue":"Contributions to Discrete Mathematics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Simple (philosophy); Combinatorics; Mathematics; Polytope","score_opus":0.006054601706075786,"score_gpt":0.23153755397967007,"score_spread":0.2254829522735943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413186082","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77453357,0.0006274873,0.110958435,0.0001926381,0.00012689,0.00008975598,0.00022691583,0.00019057271,0.11305387],"genre_scores_gemma":[0.9665415,0.00029219524,0.012022082,0.00004826026,0.00007809603,0.000046090157,0.00031288833,0.000041616433,0.020617252],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997222,0.000028940069,0.000015129053,0.000053556698,0.0001159816,0.00006418241],"domain_scores_gemma":[0.99974436,0.00006159456,0.0000703981,0.00004289034,0.00004129762,0.000039352042],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00015301062,0.00033270323,0.00028539874,0.0008700884,0.0009262573,0.0012010821,0.00022213449,0.00027406716,0.007258746],"category_scores_gemma":[0.00057923817,0.00018098115,0.0004659187,0.0004748943,0.001372172,0.0009278083,0.00089643436,0.0005565624,0.00085425156],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000111776935,0.000043659038,0.0016651205,0.0001649244,0.000025493306,0.0008958548,0.00064698095,0.008628137,0.014314927,0.95013535,0.0015446238,0.021823224],"study_design_scores_gemma":[0.000056094614,0.00030413797,0.005425539,0.00006337468,0.00004282497,0.0022516623,0.0013084036,0.024505952,0.012483321,0.89617074,0.057331532,0.00005639779],"about_ca_topic_score_codex":0.000528855,"about_ca_topic_score_gemma":0.00078006263,"teacher_disagreement_score":0.007258746,"about_ca_system_score_codex":0.00040579366,"about_ca_system_score_gemma":0.00031591512,"threshold_uncertainty_score":0.024282932},"labels":[],"label_agreement":null},{"id":"W4413186811","doi":"10.1139/cjce-2025-0024","title":"State-of-the-practice in alternative delivery of transportation infrastructure construction projects in Canada","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"University of Manitoba","funders":"","keywords":"Transportation infrastructure; Integrated project delivery; Transport engineering; State (computer science); Engineering; Construction management; State highway; Civil engineering; Business; Construction engineering; Computer science","score_opus":0.0026604116326894686,"score_gpt":0.16750049037015063,"score_spread":0.16484007873746118,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413186811","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8257447,0.010528705,0.014737239,0.016051847,0.00013900388,0.00051384844,0.010766915,0.00044597927,0.12107182],"genre_scores_gemma":[0.9799019,0.0046290485,0.007226831,0.00028566754,0.000011471578,0.000058252812,0.0016691342,0.00005955558,0.0061582117],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9787759,0.0023118888,0.0011561556,0.0014839103,0.0140968915,0.0021751204],"domain_scores_gemma":[0.9313565,0.012592217,0.0054854364,0.0037473447,0.04367106,0.0031472945],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011785621,0.000246246,0.0003751665,0.0060125776,0.0033774567,0.0074710594,0.0018441806,0.0004897556,0.0038717496],"category_scores_gemma":[0.034734625,0.00040626703,0.00041482513,0.019763213,0.0031810182,0.0018558432,0.0023951295,0.0011153144,0.00032754056],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019223966,0.0002276236,0.38617134,0.001130386,0.00011424373,0.00042225464,0.022138275,0.008305808,0.0016181334,0.047744595,0.026615469,0.5053197],"study_design_scores_gemma":[0.000018169327,0.00010292574,0.74852884,0.0012107544,0.00007380295,0.00024063252,0.031399593,0.008415012,0.0020400716,0.0026385942,0.20513992,0.00019162789],"about_ca_topic_score_codex":0.9840513,"about_ca_topic_score_gemma":0.99106276,"teacher_disagreement_score":0.10513855,"about_ca_system_score_codex":0.10513855,"about_ca_system_score_gemma":0.17388216,"threshold_uncertainty_score":0.7628371},"labels":[],"label_agreement":null},{"id":"W4413217569","doi":"10.1108/ecam-12-2024-1662","title":"Minimizing personnel assignment costs in the layout phase of steel component construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Flexibility (engineering); Salary; Factory (object-oriented programming); Total cost; Operations research; Computer science; Function (biology); Duration (music); Reduction (mathematics); Cost reduction; Assignment problem; Integer programming; Component (thermodynamics); Operations management; Reliability engineering; Mathematical optimization; Engineering; Mathematics; Business","score_opus":0.007146667112424481,"score_gpt":0.21766574123052077,"score_spread":0.21051907411809628,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413217569","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.46958128,0.0005573588,0.50932056,0.00040374784,0.00007088424,0.0005158545,0.00018141382,0.0003356441,0.019033264],"genre_scores_gemma":[0.89498895,0.00018512561,0.102130644,0.000029713885,0.000007551565,0.00012421494,0.00007960073,0.000054596774,0.0023995081],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99838924,0.00080956594,0.00004924402,0.00015345532,0.00034322913,0.0002552368],"domain_scores_gemma":[0.99815,0.0009348343,0.0004672774,0.0001516047,0.0001904865,0.00010583795],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019608242,0.00093259016,0.00057395245,0.0009026453,0.0007977677,0.0012255633,0.0008121336,0.0005270997,0.0034323612],"category_scores_gemma":[0.0051025287,0.0006127756,0.00048293857,0.0010477368,0.0005322179,0.0011948745,0.000776684,0.00072705024,0.00040370546],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00032405902,0.00030679823,0.0074226637,0.0003916017,0.00005573694,0.00013166205,0.00027474796,0.82236195,0.010167139,0.009572495,0.0011277982,0.14786343],"study_design_scores_gemma":[0.000056925757,0.0013090246,0.015853798,0.00011250734,0.00009668817,0.00019324667,0.00086143584,0.9536073,0.013407883,0.009274628,0.005164745,0.000061909705],"about_ca_topic_score_codex":0.007948914,"about_ca_topic_score_gemma":0.013691938,"teacher_disagreement_score":0.007948914,"about_ca_system_score_codex":0.0021262555,"about_ca_system_score_gemma":0.0043981248,"threshold_uncertainty_score":0.015805304},"labels":[],"label_agreement":null},{"id":"W4413366889","doi":"10.1016/j.aei.2025.103778","title":"Leveraging linked data for space constraints checking of mobile cranes in modular construction assembly lookahead planning","year":2025,"lang":"en","type":"article","venue":"Advanced Engineering Informatics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Worldwide Universities Network; University of Auckland","keywords":"Modular design; Computer science; Modular construction; Space (punctuation); Systems engineering; Distributed computing; Engineering drawing; Theoretical computer science; Engineering; Programming language; Operating system","score_opus":0.013130944557142955,"score_gpt":0.25290981802778956,"score_spread":0.2397788734706466,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413366889","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05087549,0.000118333606,0.94053817,0.00014842785,0.000032488257,0.00023622674,0.0010180058,0.0042817355,0.0027510358],"genre_scores_gemma":[0.53374267,0.00018178407,0.46129143,0.00007970911,0.000015664311,0.00034587889,0.0029865128,0.00052835874,0.0008280034],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953244,0.0010151559,0.00041961097,0.0008611156,0.0020441276,0.00033565034],"domain_scores_gemma":[0.99313825,0.0028824548,0.00092694897,0.0014835675,0.001374146,0.0001945156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0031713725,0.0012064627,0.0009890468,0.004142044,0.001380993,0.0039886297,0.0023439473,0.0011468229,0.0019041509],"category_scores_gemma":[0.013586349,0.00080257177,0.0019931565,0.0033534532,0.001888467,0.0060339486,0.0041507846,0.0015224708,0.0005049223],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026606637,0.0002900608,0.016275186,0.00044408618,0.00016993904,0.0009203615,0.0011465199,0.7671912,0.009392666,0.07001013,0.0021203924,0.1317734],"study_design_scores_gemma":[0.000022380425,0.000046802554,0.0009866979,0.000059387658,0.000036371046,0.00006486573,0.0002271277,0.9621083,0.010413788,0.02181058,0.0041790917,0.00004451949],"about_ca_topic_score_codex":0.02408352,"about_ca_topic_score_gemma":0.028625166,"teacher_disagreement_score":0.02408352,"about_ca_system_score_codex":0.0018870473,"about_ca_system_score_gemma":0.004290222,"threshold_uncertainty_score":0.04788667},"labels":[],"label_agreement":null},{"id":"W4413515835","doi":"10.1139/cjce-2024-0579","title":"Evaluating advanced building insulation materials: a flexible-weighting multi-objective optimization approach","year":2025,"lang":"en","type":"article","venue":"Canadian Journal of Civil Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"Laurentian University; Okanagan University College; University of British Columbia, Okanagan Campus; University of British Columbia","funders":"FortisBC; Mitacs","keywords":"Weighting; Structural engineering; Computer science; Engineering; Reliability engineering","score_opus":0.015307732832724106,"score_gpt":0.24551753361111506,"score_spread":0.23020980077839096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413515835","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5528772,0.0010294571,0.42869303,0.00042596465,0.00005667303,0.0003565262,0.00050135143,0.00028454204,0.0157754],"genre_scores_gemma":[0.9102863,0.00022562545,0.08570871,0.00007969257,0.000013060409,0.0002578668,0.00028383316,0.000050012743,0.0030949845],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946624,0.00028837827,0.00001619161,0.000057535348,0.00009126419,0.00008042048],"domain_scores_gemma":[0.99928826,0.0005056185,0.000055727174,0.000026882446,0.00008786492,0.0000356439],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016567279,0.0014479568,0.0010101643,0.0010268722,0.00031499995,0.0011201217,0.00090869574,0.00113344,0.0016439079],"category_scores_gemma":[0.001633722,0.000629439,0.0012425854,0.00077860896,0.00043847295,0.0006260083,0.00082238636,0.00073960074,0.00012928752],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000012809982,0.000022128766,0.00021814935,0.0000135026075,0.000019014291,0.000011785273,0.0000033781798,0.99696785,0.0002564629,0.00022341804,0.00003656198,0.0022150315],"study_design_scores_gemma":[0.0000060050143,0.000029951458,0.000151583,0.0000025270447,0.000007634253,0.000002333079,0.0000069085063,0.9993405,0.00012059933,0.00025493992,0.000074575524,0.0000025070706],"about_ca_topic_score_codex":0.014902652,"about_ca_topic_score_gemma":0.015045448,"teacher_disagreement_score":0.014902652,"about_ca_system_score_codex":0.0010805771,"about_ca_system_score_gemma":0.0015337762,"threshold_uncertainty_score":0.029631793},"labels":[],"label_agreement":null},{"id":"W4413604232","doi":"10.64628/aam.pv6qmexaa","title":"Artificial intelligence can support architects but lacks empathy and ethics","year":2023,"lang":"en","type":"preprint","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"","keywords":"Empathy; Psychology; Cognitive science; Sociology; Social psychology","score_opus":0.07711643299813538,"score_gpt":0.2917643723101777,"score_spread":0.21464793931204235,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413604232","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04761484,0.0009048309,0.26933873,0.037178252,0.00051212026,0.00004857284,0.00009489172,0.0006465703,0.64366126],"genre_scores_gemma":[0.8597445,0.0005979242,0.07601337,0.0020912879,0.0002593931,0.00009618758,0.00019252172,0.0002642664,0.06074056],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9944425,0.0026721554,0.00019110534,0.0005669332,0.0016987692,0.0004284788],"domain_scores_gemma":[0.9890205,0.005122057,0.00049688097,0.003667439,0.0012056844,0.00048748674],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057580215,0.0007547181,0.0007210445,0.0013724222,0.0029834914,0.0078355,0.00094308855,0.003479988,0.011479204],"category_scores_gemma":[0.020594817,0.00066574826,0.00041246926,0.0012904468,0.008199815,0.016721113,0.007448419,0.0040526744,0.0026974536],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000146188095,0.00003662467,0.00049541064,0.000038679642,0.000014133811,0.000079073616,0.0008821296,0.0010813583,0.00061666843,0.9692796,0.004086296,0.023375452],"study_design_scores_gemma":[0.000008722901,0.000011579971,0.0004683995,0.000036689144,0.000009104493,0.00014881382,0.00062105426,0.0068153907,0.0008492442,0.95040715,0.040612265,0.0000116601705],"about_ca_topic_score_codex":0.0013186553,"about_ca_topic_score_gemma":0.0012574788,"teacher_disagreement_score":0.011479204,"about_ca_system_score_codex":0.0013265932,"about_ca_system_score_gemma":0.0025488422,"threshold_uncertainty_score":0.038401723},"labels":[],"label_agreement":null},{"id":"W4413882907","doi":"10.1016/j.autcon.2025.106496","title":"AI applications for structural design automation","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":6,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Automation; Engineering; Systems engineering; Computer science; Software engineering; Manufacturing engineering; Engineering drawing; Mechanical engineering","score_opus":0.008366985701120627,"score_gpt":0.25174391815064023,"score_spread":0.2433769324495196,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413882907","genre_codex":"review","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0056646075,0.61594707,0.24160124,0.003375275,0.00102098,0.00034231695,0.0006213415,0.0010842367,0.130343],"genre_scores_gemma":[0.12183911,0.55227333,0.30514848,0.0022292226,0.00095327524,0.0006200129,0.0012767587,0.00030767743,0.015352172],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9957789,0.0013812599,0.00038395156,0.00037954174,0.0019856538,0.00009076064],"domain_scores_gemma":[0.990931,0.0069204313,0.0005036817,0.00046121448,0.0011026955,0.000081007245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029843408,0.001067347,0.00080518203,0.0048036487,0.0006764821,0.002634722,0.0014011667,0.0015262084,0.014857254],"category_scores_gemma":[0.009651607,0.00053038663,0.0014027961,0.005519441,0.0013652893,0.0028075143,0.0017124979,0.0013425607,0.0036038514],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00004810746,0.000060872306,0.0011277247,0.02293077,0.00020310497,0.00024500233,0.00072701153,0.0069311946,0.0051647127,0.08243754,0.010986874,0.8691371],"study_design_scores_gemma":[0.00002356996,0.00015470838,0.0024905575,0.010540788,0.00020491563,0.0012026046,0.0005815014,0.0056210565,0.0043640025,0.09665053,0.8780955,0.00007018889],"about_ca_topic_score_codex":0.0011755583,"about_ca_topic_score_gemma":0.002095797,"teacher_disagreement_score":0.014857254,"about_ca_system_score_codex":0.0011238214,"about_ca_system_score_gemma":0.001955718,"threshold_uncertainty_score":0.049702466},"labels":[],"label_agreement":null},{"id":"W4413925809","doi":"10.1109/icra55743.2025.11127354","title":"Unveiling the Depths: A Multi-Modal Fusion Framework for Challenging Scenarios","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Artificial Intelligence in Medicine (Canada)","funders":"National Natural Science Foundation of China","keywords":"Modal; Computer science; Fusion; Sensor fusion; Geology; Artificial intelligence; Materials science","score_opus":0.01432126376802112,"score_gpt":0.2567118489332794,"score_spread":0.2423905851652583,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4413925809","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008073866,0.00009667688,0.9905432,0.000078181634,0.000012775394,0.000021518681,0.00005833713,0.00050347403,0.0006119471],"genre_scores_gemma":[0.41283917,0.00030268947,0.58353204,0.00020066592,0.00007371865,0.00012262964,0.0004536536,0.00022535327,0.0022501193],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99942327,0.00011017332,0.000020564945,0.00013451902,0.00023203444,0.0000793361],"domain_scores_gemma":[0.99943954,0.00017802257,0.000082588675,0.00008664394,0.0001596766,0.0000535435],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012849327,0.0013046402,0.00066306035,0.000998771,0.00046723135,0.0010171521,0.0017211108,0.0012238311,0.0021714857],"category_scores_gemma":[0.002716352,0.00045796766,0.00096627086,0.00069454534,0.00061924435,0.0024928998,0.0031454363,0.0018996937,0.00055529043],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00031367227,0.00014106867,0.0013571186,0.00013138016,0.00011258426,0.000172138,0.00030722917,0.4836864,0.040392727,0.013200664,0.0027945323,0.4573904],"study_design_scores_gemma":[0.0000057377833,0.000041347004,0.0003452847,0.000008290839,0.0000153238,0.000052018477,0.000030511135,0.9840291,0.006575724,0.008021352,0.0008610753,0.000014267097],"about_ca_topic_score_codex":0.0035922434,"about_ca_topic_score_gemma":0.0044931513,"teacher_disagreement_score":0.0035922434,"about_ca_system_score_codex":0.00070922147,"about_ca_system_score_gemma":0.0006664164,"threshold_uncertainty_score":0.0072643757},"labels":[],"label_agreement":null},{"id":"W4414113226","doi":"10.1016/j.autcon.2025.106505","title":"Dual-stream transformer-based activity classification for off-site construction productivity analysis","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"Korea Forestry Promotion Institute; Korea Agency for Infrastructure Technology Advancement; Korea Forest Service; Ministry of Land, Infrastructure and Transport","keywords":"Productivity; Production (economics); Automation; Statistical analysis; Construction industry","score_opus":0.010258749328550172,"score_gpt":0.24494372053748803,"score_spread":0.23468497120893786,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414113226","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.07400587,0.00019213004,0.919406,0.000096646654,0.000037423637,0.00010659467,0.0006492561,0.0030956308,0.0024103774],"genre_scores_gemma":[0.83321786,0.00025561394,0.16218887,0.00005038427,0.000036152014,0.00011771125,0.0015274711,0.00010251216,0.0025034607],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960047,0.000032323253,0.000018382612,0.00012264014,0.000154674,0.000071534196],"domain_scores_gemma":[0.9996062,0.00008205583,0.000078273806,0.000042142314,0.0001499831,0.000041326974],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00040497672,0.0009119058,0.00064794207,0.003187478,0.00016260488,0.00081089523,0.0011557335,0.00045720607,0.0015167609],"category_scores_gemma":[0.0011363779,0.0002540573,0.00065448484,0.0018687902,0.0002477109,0.00085617066,0.0007124093,0.00050690403,0.00087443314],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00040168592,0.00056872866,0.031238824,0.00018126429,0.00010758447,0.00024979093,0.00015455019,0.18769565,0.025149338,0.0030829625,0.004258133,0.74691147],"study_design_scores_gemma":[0.000005884815,0.000041437215,0.0048613898,0.000007335744,0.00001638537,0.0000635437,0.000041259213,0.98764056,0.0051588956,0.0012903113,0.00086405536,0.000008862878],"about_ca_topic_score_codex":0.008304115,"about_ca_topic_score_gemma":0.011440428,"teacher_disagreement_score":0.008304115,"about_ca_system_score_codex":0.00078121386,"about_ca_system_score_gemma":0.00079714,"threshold_uncertainty_score":0.01651156},"labels":[],"label_agreement":null},{"id":"W4414318939","doi":"10.1515/rams-2025-0131","title":"Innovative optimization of seashell ash-based lightweight foamed concrete: Enhancing physicomechanical properties through ANN-GA hybrid approach","year":2025,"lang":"en","type":"article","venue":"REVIEWS ON ADVANCED MATERIALS SCIENCE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Ultimate tensile strength; Curing (chemistry); Porosity; Compressive strength; Flexural strength; Cement; Absorption of water; Response surface methodology","score_opus":0.017787934557885528,"score_gpt":0.2539344024589038,"score_spread":0.2361464679010183,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414318939","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.54988194,0.0017885816,0.4390307,0.0002394565,0.000079685764,0.00014328494,0.00022200258,0.0008749174,0.00773935],"genre_scores_gemma":[0.95633465,0.00021066051,0.041705787,0.0000542437,0.000008283337,0.00010515557,0.00014409913,0.000025144675,0.0014119918],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998388,0.0000375507,0.000011808744,0.00003908336,0.000038218543,0.000034509896],"domain_scores_gemma":[0.9997929,0.00009887754,0.000033042626,0.000010320701,0.000052621144,0.000012305044],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004664475,0.0011172689,0.00066862296,0.0006596388,0.00018662875,0.0006117139,0.0006585258,0.0010177089,0.0010019114],"category_scores_gemma":[0.0006202872,0.00040851795,0.00090139825,0.00033050164,0.00020736542,0.00036471366,0.00039564024,0.00041930482,0.00017635257],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059734553,0.000105910556,0.0012162413,0.00008528603,0.00006165383,0.00006099775,0.000015016869,0.97107106,0.007818857,0.00019523191,0.00013899445,0.019171001],"study_design_scores_gemma":[0.0000035306236,0.000042827854,0.00030029585,0.000005731473,0.0000118673515,0.000005458193,0.0000057858533,0.9986488,0.00082716695,0.00005928438,0.00008564081,0.000003517352],"about_ca_topic_score_codex":0.0068707736,"about_ca_topic_score_gemma":0.008292496,"teacher_disagreement_score":0.0068707736,"about_ca_system_score_codex":0.0003554925,"about_ca_system_score_gemma":0.000548016,"threshold_uncertainty_score":0.013661563},"labels":[],"label_agreement":null},{"id":"W4414354050","doi":"10.1061/jladah.ladr-1335","title":"Framework for 4D Simulation Collaboration in Construction Delay Claims","year":2025,"lang":"en","type":"article","venue":"Journal of Legal Affairs and Dispute Resolution in Engineering and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Hydro-Québec","funders":"","keywords":"Negotiation; Scheme (mathematics); Construction management; Construction industry; Key (lock)","score_opus":0.004342310570247853,"score_gpt":0.23480132422669123,"score_spread":0.23045901365644336,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414354050","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.003433873,0.0003852491,0.94546777,0.0015601577,0.000118377815,0.00050958863,0.00022805542,0.00045901458,0.04783799],"genre_scores_gemma":[0.17337091,0.000764318,0.8130125,0.00026638818,0.00008975784,0.0014432595,0.0005501352,0.00016861453,0.010334212],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9911953,0.00495764,0.00068065623,0.0009810511,0.0016497673,0.00053561997],"domain_scores_gemma":[0.9932863,0.0035538764,0.000696252,0.0006531276,0.0013316905,0.00047871209],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.009411304,0.0011920478,0.00055357296,0.0050242483,0.0025487707,0.006618098,0.0032940675,0.0030989365,0.015591836],"category_scores_gemma":[0.012478172,0.00078886474,0.002275653,0.002833191,0.0047099995,0.0051173596,0.0070597827,0.0022646452,0.0025241023],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023190221,0.00006273852,0.0012628263,0.0001495975,0.000019352296,0.00042368926,0.0022163112,0.02258362,0.00041670864,0.9525772,0.0020533537,0.01821144],"study_design_scores_gemma":[0.00008025538,0.00013606912,0.0011248133,0.0008577554,0.00009134709,0.0007476141,0.0042132637,0.26505905,0.0012396108,0.545893,0.18044102,0.00011618825],"about_ca_topic_score_codex":0.016689094,"about_ca_topic_score_gemma":0.011965393,"teacher_disagreement_score":0.016689094,"about_ca_system_score_codex":0.004570149,"about_ca_system_score_gemma":0.0077463067,"threshold_uncertainty_score":0.052159846},"labels":[],"label_agreement":null},{"id":"W4414528238","doi":"10.24928/2025/0137","title":"Perceptions of Robotic Inspections for Confined Spaces in Lean Construction: a Qualitative Study","year":2025,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Government of Canada","keywords":"Qualitative research; Perception; Qualitative analysis; Perspective (graphical); Process (computing)","score_opus":0.02037640510702035,"score_gpt":0.2946347044283448,"score_spread":0.2742582993213244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414528238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99177027,0.00030163064,0.003367222,0.0015589533,0.000029789928,0.00010749794,0.000061197636,0.000017031449,0.002786373],"genre_scores_gemma":[0.9960764,0.00033557386,0.001275051,0.000639899,0.000007889172,0.0001545436,0.00002728122,0.00001619565,0.0014671633],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9882582,0.0081055,0.00033891198,0.00065557606,0.0012023423,0.0014395197],"domain_scores_gemma":[0.9760813,0.01693092,0.0016283541,0.0004553053,0.0026042734,0.0022998408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01791435,0.0004045717,0.00074819016,0.0013990705,0.004604768,0.002894282,0.0012893577,0.0016400643,0.0031511574],"category_scores_gemma":[0.020896126,0.0006354928,0.00038788654,0.000952277,0.0086403005,0.003227288,0.003878792,0.0023179462,0.00038675487],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000035654422,0.00007371905,0.004783133,0.0001860153,0.0000034683396,0.0004852788,0.9880745,0.000054554675,0.0011636971,0.0010821968,0.00033683676,0.0037209322],"study_design_scores_gemma":[0.000003494911,0.00007887136,0.0014009934,0.00013453294,0.000002720586,0.00016439788,0.9932354,0.00011623751,0.00021935746,0.00022181874,0.0044079525,0.000014203841],"about_ca_topic_score_codex":0.007140341,"about_ca_topic_score_gemma":0.0084725795,"teacher_disagreement_score":0.01791435,"about_ca_system_score_codex":0.003657385,"about_ca_system_score_gemma":0.0050111804,"threshold_uncertainty_score":0.094741285},"labels":[],"label_agreement":null},{"id":"W4414544421","doi":"10.1680/jenes.24.00146","title":"Assessing the life cycle environmental impacts of modular construction: a US case study of a prototype housing unit","year":2025,"lang":"en","type":"article","venue":"Journal of Environmental Engineering and Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Greenhouse gas; Scope (computer science); Life-cycle assessment; Resource efficiency; Modular design; Unit (ring theory); Sustainability; Resource (disambiguation); Environmental impact assessment","score_opus":0.006928575783308137,"score_gpt":0.22266038879232491,"score_spread":0.21573181300901678,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414544421","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99109215,0.00021139483,0.0038816328,0.00013763046,0.0000070354213,0.00017301936,0.00057521136,0.000031546722,0.0038902045],"genre_scores_gemma":[0.98868525,0.0002818775,0.009271456,0.000031837186,0.000003561529,0.0000766918,0.0004113338,0.000018340324,0.001219614],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9992418,0.00033751337,0.000028217124,0.00008534504,0.00020243396,0.000104738494],"domain_scores_gemma":[0.9987526,0.0007014844,0.00010773711,0.000099648234,0.00027875515,0.000059740807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019257674,0.0006502966,0.00031218395,0.0015364878,0.00097287423,0.0009925833,0.00087849394,0.0009772903,0.0014734989],"category_scores_gemma":[0.002164081,0.00030229823,0.00078652514,0.0022187268,0.000731003,0.0009043425,0.0007740367,0.00045989364,0.00019447091],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014218675,0.0034364644,0.2396186,0.0011369234,0.0004668061,0.0131173525,0.0040829186,0.5377358,0.021277202,0.00963031,0.007140311,0.16093549],"study_design_scores_gemma":[0.00026764596,0.005344299,0.22529389,0.00040049746,0.0006428624,0.003076448,0.019775052,0.67007935,0.040231116,0.0075795683,0.027034149,0.000275232],"about_ca_topic_score_codex":0.049321834,"about_ca_topic_score_gemma":0.11051654,"teacher_disagreement_score":0.049321834,"about_ca_system_score_codex":0.003215529,"about_ca_system_score_gemma":0.0016585332,"threshold_uncertainty_score":0.09806949},"labels":[],"label_agreement":null},{"id":"W4414549080","doi":"10.24928/2025/0189","title":"A Lean Approach to Productivity Improvement in Roof Panel Manufacturing for Modular Off-site Construction Using DfMA and Emerging Technologies","year":2025,"lang":"en","type":"article","venue":"Annual Conference of the International Group for Lean Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Productivity; Emerging technologies; Modular design; Design for manufacturability; Lean manufacturing","score_opus":0.018570895413963243,"score_gpt":0.230585939792821,"score_spread":0.21201504437885776,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414549080","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1415839,0.00072596676,0.83135617,0.00073557015,0.000037138332,0.00030803666,0.000044128778,0.00020119401,0.025007935],"genre_scores_gemma":[0.62483454,0.00045022412,0.37153152,0.000076499535,0.000009893616,0.0001587953,0.000038713468,0.000015298563,0.0028845496],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9981699,0.0007179215,0.000052802694,0.00014565616,0.0007473512,0.00016634043],"domain_scores_gemma":[0.9990075,0.00041467752,0.0001425808,0.00009086996,0.00028920083,0.00005529457],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0022453482,0.00060574303,0.00025718316,0.0017007954,0.00082793075,0.0019467174,0.0009711129,0.00048034554,0.0009064042],"category_scores_gemma":[0.0020491036,0.0002103565,0.00043980248,0.0011500026,0.0013393328,0.0010604231,0.001576546,0.00058339356,0.00013334777],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017962085,0.00074089714,0.012542493,0.0006861552,0.00008433227,0.0005714793,0.0032732186,0.12019358,0.029630397,0.14990284,0.0014459302,0.6807491],"study_design_scores_gemma":[0.00016540854,0.0029115956,0.02398364,0.0008784543,0.00019381459,0.0011872888,0.00963292,0.6838289,0.04654187,0.15191443,0.078605205,0.00015642325],"about_ca_topic_score_codex":0.0037521399,"about_ca_topic_score_gemma":0.010177076,"teacher_disagreement_score":0.0037521399,"about_ca_system_score_codex":0.002974249,"about_ca_system_score_gemma":0.0039503607,"threshold_uncertainty_score":0.021579742},"labels":[],"label_agreement":null},{"id":"W4414680902","doi":"10.1007/978-3-031-99025-0_19","title":"Innovative Engineering Anchor Systems for Retrofits","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in networks and systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke; University of Ottawa","funders":"","keywords":"Retrofitting; Failure mode and effects analysis; Fibre-reinforced plastic; Anchoring; Composite number; Adhesive; Lag; Matrix (chemical analysis)","score_opus":0.008619377521788015,"score_gpt":0.1973230651028846,"score_spread":0.1887036875810966,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414680902","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013689181,0.008781,0.76115483,0.0009963589,0.0016603534,0.00012855703,0.0004751887,0.003978416,0.20913607],"genre_scores_gemma":[0.31155768,0.01666465,0.3450899,0.00044121355,0.0006484875,0.00031707704,0.0017137728,0.0010616942,0.3225054],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.999328,0.00009559181,0.000031217503,0.00009797785,0.00039645965,0.000050733863],"domain_scores_gemma":[0.99973804,0.00004723517,0.000017769971,0.000073430754,0.000105465144,0.000018057126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007191333,0.0011900794,0.0006491925,0.0015258902,0.00058878976,0.0030832407,0.001879987,0.0016834139,0.034142777],"category_scores_gemma":[0.0008111359,0.00048294174,0.00058014505,0.0020950693,0.00072464935,0.0031303342,0.0025313438,0.0012359986,0.010170358],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012318112,0.000095846844,0.0004704866,0.00057231763,0.00003970096,0.00023512945,0.00035361008,0.030415658,0.021803413,0.20931175,0.030705312,0.7058737],"study_design_scores_gemma":[0.000048841066,0.00027176822,0.0007942035,0.00030504944,0.0000832947,0.0005603195,0.000398313,0.052690815,0.018768724,0.08128476,0.84472907,0.000064891574],"about_ca_topic_score_codex":0.000690525,"about_ca_topic_score_gemma":0.0011017167,"teacher_disagreement_score":0.034142777,"about_ca_system_score_codex":0.0006090115,"about_ca_system_score_gemma":0.00065737293,"threshold_uncertainty_score":0.11421889},"labels":[],"label_agreement":null},{"id":"W4414692457","doi":"","title":"Guide pour la mise en place d’une charte pour l’usage des techniques d’intelligence artificielle en école d’architecture","year":2025,"lang":"fr","type":"report","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Context (archaeology); Scarring alopecia; Constitution","score_opus":0.011870201072775081,"score_gpt":0.23486287534427364,"score_spread":0.22299267427149855,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414692457","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0065489085,0.008353482,0.33218366,0.0680018,0.005062854,0.0017413963,0.0024996228,0.010155057,0.5654533],"genre_scores_gemma":[0.032772556,0.009432741,0.2959331,0.009353058,0.0008139216,0.0012941471,0.002580089,0.0024446156,0.64537585],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99432737,0.0013892754,0.00038838835,0.00049457187,0.003073637,0.0003266753],"domain_scores_gemma":[0.9865361,0.0028777197,0.0003934875,0.0015268499,0.0078062625,0.0008596845],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0052886913,0.0009782163,0.00052701985,0.003103384,0.0026922927,0.0077424217,0.002042759,0.0043519936,0.04900479],"category_scores_gemma":[0.012696416,0.0006810725,0.0011839388,0.0019274865,0.002566692,0.007391418,0.0037340613,0.004754234,0.034787744],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00007073804,0.00013323792,0.0011685549,0.0010134587,0.000020147825,0.00045107215,0.0067106537,0.0020476559,0.006843878,0.1816793,0.48374832,0.31611297],"study_design_scores_gemma":[0.0000070940914,0.000026917854,0.00041126565,0.00030965998,0.0000041598632,0.00016206846,0.0005526165,0.00040529657,0.0006542774,0.0076317247,0.9898114,0.000023615647],"about_ca_topic_score_codex":0.021366525,"about_ca_topic_score_gemma":0.03619948,"teacher_disagreement_score":0.04900479,"about_ca_system_score_codex":0.004855954,"about_ca_system_score_gemma":0.0104272105,"threshold_uncertainty_score":0.16393739},"labels":[{"model":"gemma","categories":[],"domain":null,"study_design":"not_applicable","genre":"other","about_ca_system":false,"about_ca_topic":false,"confidence":"low"},{"model":"gpt","categories":[],"domain":null,"study_design":"design_other","genre":"other","about_ca_system":false,"about_ca_topic":false,"confidence":"high"}],"label_agreement":"split"},{"id":"W4414692685","doi":"10.64889/k559ke75","title":"Analogs as a research platform: Systems-based optimization approach to facility selection","year":2025,"lang":"en","type":"article","venue":"Analog Astronaut™ Research Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Selection (genetic algorithm); Mars Exploration Program; Feature selection; Martian surface; Analog computer; Analytic hierarchy process","score_opus":0.05817749041672972,"score_gpt":0.3509981701202323,"score_spread":0.2928206797035026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414692685","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.018331878,0.0011332916,0.96557397,0.000976143,0.00009900963,0.0006806173,0.0002764747,0.00022251031,0.012706198],"genre_scores_gemma":[0.5748818,0.001429584,0.41368085,0.00056422525,0.00018521128,0.0020257374,0.0006406996,0.00012862262,0.006463233],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9953896,0.0030862484,0.0001404774,0.00042643162,0.00063503085,0.00032216436],"domain_scores_gemma":[0.99451715,0.004185318,0.00037643802,0.00013728182,0.0005802739,0.00020347825],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0060126255,0.002068971,0.0022889203,0.0029195843,0.00076003984,0.0028253964,0.0024976376,0.0020530703,0.0061029224],"category_scores_gemma":[0.008041913,0.0010496561,0.0017636367,0.0026888547,0.001503472,0.0017802106,0.0026008205,0.0020954679,0.00039892492],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000440307,0.000079478785,0.0005463193,0.00011177925,0.00009508175,0.00005122715,0.000034984525,0.97544163,0.00015913905,0.011034179,0.0007074422,0.011694675],"study_design_scores_gemma":[0.000027952145,0.00010753807,0.00021935088,0.0000277034,0.000025404133,0.000011243661,0.000044921406,0.9887666,0.000079148245,0.009676831,0.001002617,0.000010671103],"about_ca_topic_score_codex":0.011587287,"about_ca_topic_score_gemma":0.009459536,"teacher_disagreement_score":0.011587287,"about_ca_system_score_codex":0.0027336162,"about_ca_system_score_gemma":0.005363253,"threshold_uncertainty_score":0.031798124},"labels":[],"label_agreement":null},{"id":"W4414948238","doi":"10.3390/infrastructures10100266","title":"Digital Integration in Construction: A Case Study on Common Data Environment Implementation for a Metro Line Project","year":2025,"lang":"en","type":"article","venue":"Infrastructures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Workflow; Software deployment; Automation; Consistency (knowledge bases); Stakeholder; Cloud computing; Field (mathematics); Data integration; System integration","score_opus":0.02646416595865115,"score_gpt":0.32432318965952966,"score_spread":0.2978590237008785,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414948238","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9851091,0.00006287692,0.006046956,0.00062664016,0.000010085004,0.00029801068,0.000039242892,0.000037217476,0.0077698594],"genre_scores_gemma":[0.98739177,0.00011942369,0.009306868,0.00011879123,0.0000072657353,0.00018478314,0.00005416794,0.000034232435,0.002782544],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9881015,0.0073097963,0.00036082574,0.0008637252,0.0019617851,0.0014023508],"domain_scores_gemma":[0.98693323,0.006636124,0.0012185933,0.0017803565,0.0018702112,0.0015614195],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01046833,0.0005088278,0.00047281614,0.001772336,0.009364641,0.0036733882,0.0018570794,0.0022308868,0.0021720508],"category_scores_gemma":[0.015608377,0.0005463658,0.00037713567,0.0026133957,0.0053983573,0.0027529136,0.0048803473,0.0022102937,0.00039613876],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051837496,0.005836044,0.10791513,0.00080171716,0.00008382495,0.034179233,0.6132485,0.010595518,0.013256257,0.020617036,0.004412175,0.18853618],"study_design_scores_gemma":[0.000104151,0.0031318078,0.06593645,0.00044618765,0.00005567448,0.005734539,0.8032739,0.011418009,0.010150145,0.0039062155,0.0957041,0.000138847],"about_ca_topic_score_codex":0.015233793,"about_ca_topic_score_gemma":0.04167985,"teacher_disagreement_score":0.015233793,"about_ca_system_score_codex":0.0069441735,"about_ca_system_score_gemma":0.0077033234,"threshold_uncertainty_score":0.055362523},"labels":[],"label_agreement":null},{"id":"W4414979419","doi":"10.1007/s44150-025-00177-9","title":"Integrating life cycle assessment in space layout planning for minimizing the embodied carbon emission of modular buildings – identification of influencing factors","year":2025,"lang":"en","type":"article","venue":"Architecture Structures and Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; Concordia University","funders":"National Research Council Canada","keywords":"Modular design; Identification (biology); Life-cycle assessment; Process (computing); Relevance (law); Embodied energy; Engineering design process","score_opus":0.005460698791348866,"score_gpt":0.24338746637308484,"score_spread":0.23792676758173598,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414979419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.77172375,0.0012431503,0.21111177,0.00018406074,0.00002095168,0.00034498065,0.00032159474,0.00011463719,0.014935013],"genre_scores_gemma":[0.9732546,0.00032645097,0.025569113,0.000007734677,0.0000029998907,0.00008184744,0.0001577303,0.000012469446,0.000587015],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9989956,0.00042171334,0.00003875471,0.0000915621,0.00034943633,0.000103025486],"domain_scores_gemma":[0.99832076,0.00092033035,0.00020110587,0.0000676369,0.00044024576,0.000049879123],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016279744,0.0008396131,0.00046274273,0.0025033322,0.00039880816,0.0017332251,0.0005104226,0.00062045985,0.0015156759],"category_scores_gemma":[0.0027826936,0.0003424067,0.0009784166,0.002120981,0.00036887825,0.0010250356,0.00070865365,0.0003446606,0.00017784227],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000104311606,0.00017488525,0.020223238,0.00043524022,0.00010991097,0.00025684023,0.00019212371,0.8898759,0.0091214385,0.0038934655,0.00034550065,0.07526724],"study_design_scores_gemma":[0.000009406214,0.0002751351,0.022958344,0.000111994515,0.00010763713,0.00007307164,0.000607131,0.96254635,0.008038095,0.0034137676,0.0018149074,0.00004406765],"about_ca_topic_score_codex":0.008499275,"about_ca_topic_score_gemma":0.016273392,"teacher_disagreement_score":0.008499275,"about_ca_system_score_codex":0.002067851,"about_ca_system_score_gemma":0.0018139931,"threshold_uncertainty_score":0.016899586},"labels":[],"label_agreement":null},{"id":"W4414981456","doi":"10.3390/su17198945","title":"A Conceptual Framework for Enabling Structural Steel Reuse Utilizing Circular Economy in Modular Construction","year":2025,"lang":"en","type":"article","venue":"Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Canada First Research Excellence Fund; Concordia University","keywords":"Circular economy; Reuse; Modular design; Certification; Modularity (biology); Sustainability; Resource (disambiguation); Material efficiency","score_opus":0.00939170013188222,"score_gpt":0.2542634550556289,"score_spread":0.2448717549237467,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4414981456","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.015207093,0.0055671697,0.79596776,0.015420767,0.00023740325,0.00078971277,0.0007878141,0.00035550277,0.1656667],"genre_scores_gemma":[0.3572423,0.005664374,0.6254171,0.0013507055,0.00009806179,0.0013289724,0.0009223186,0.000117457304,0.007858681],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99435836,0.003244983,0.00038309372,0.00068326865,0.00092305645,0.00040728846],"domain_scores_gemma":[0.99493825,0.0027490212,0.00053941645,0.00053840084,0.00087285385,0.00036204708],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0099154245,0.0012864046,0.00047978907,0.009008616,0.0024166256,0.007932382,0.0035697066,0.0035935084,0.005345796],"category_scores_gemma":[0.007795776,0.0006061838,0.0017371543,0.0067096483,0.014927103,0.009950576,0.005966001,0.0026136404,0.0009412025],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000029657006,0.00001762054,0.00039176588,0.00014967064,0.0000071905642,0.000078451165,0.000974882,0.0031570927,0.00009728699,0.98703116,0.00078055076,0.0073112953],"study_design_scores_gemma":[0.00001658719,0.000050334103,0.0012691676,0.0018994651,0.00006576849,0.00036817684,0.0054623657,0.01572769,0.0004923083,0.80877197,0.16582648,0.000049632254],"about_ca_topic_score_codex":0.01505709,"about_ca_topic_score_gemma":0.019041363,"teacher_disagreement_score":0.01505709,"about_ca_system_score_codex":0.00825788,"about_ca_system_score_gemma":0.013264859,"threshold_uncertainty_score":0.059915423},"labels":[],"label_agreement":null},{"id":"W4415048789","doi":"10.1109/toh.2025.3620038","title":"Haptic-Assisted Soldering Training Protocol in Virtual Reality: The Impact of Scaffolded Guidance","year":2025,"lang":"en","type":"article","venue":"IEEE Transactions on Haptics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"Türkiye Bilimsel ve Teknolojik Araştırma Kurumu","keywords":"Haptic technology; Virtual reality; Task (project management); SAFER; Protocol (science); Virtual machine; Virtual training; Transfer of training","score_opus":0.03293334836998599,"score_gpt":0.2983370314729121,"score_spread":0.26540368310292606,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415048789","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8777658,0.0007308128,0.11715669,0.000098863355,0.00016867158,0.0006331628,0.00015038993,0.001234538,0.0020611663],"genre_scores_gemma":[0.9277308,0.00027877808,0.06954616,0.00009066841,0.000038537306,0.0007011348,0.0001687659,0.00013187672,0.0013132665],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999244,0.00023972006,0.000082113744,0.00013155723,0.00019610944,0.00010668154],"domain_scores_gemma":[0.99861205,0.00075781415,0.00013665191,0.00024204708,0.00014936626,0.000102007856],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073160307,0.000597242,0.00041478086,0.00037142012,0.00017605152,0.0005394447,0.0006953756,0.00064122054,0.0022619609],"category_scores_gemma":[0.004132567,0.00019951271,0.00029898828,0.0001666005,0.00037994827,0.00055565813,0.0008177267,0.00035744946,0.0003723114],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0058562574,0.0037961088,0.0018432715,0.0013290928,0.00009336832,0.00039186366,0.0014857816,0.017620428,0.7251921,0.001019811,0.00075997616,0.2406118],"study_design_scores_gemma":[0.0018469499,0.061300624,0.067819,0.00029214926,0.0005912185,0.0027479543,0.0010682208,0.12587552,0.7124608,0.002300855,0.023160752,0.00053595466],"about_ca_topic_score_codex":0.00041315044,"about_ca_topic_score_gemma":0.0004041695,"teacher_disagreement_score":0.0022619609,"about_ca_system_score_codex":0.000106184256,"about_ca_system_score_gemma":0.00031427553,"threshold_uncertainty_score":0.007567048},"labels":[],"label_agreement":null},{"id":"W4415167283","doi":"10.3390/buildings15203696","title":"Correction: Ahmadianroohbakhsh et al. Approximating Helical Pile Pullout Resistance Using Metaheuristic-Enabled Fuzzy Hybrids. Buildings 2023, 13, 347","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McMaster University","funders":"","keywords":"Pile; Fuzzy logic; Finite element method","score_opus":0.009285314522379734,"score_gpt":0.23808288279278916,"score_spread":0.22879756827040942,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415167283","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00026024634,0.001455824,0.0013557362,0.021348309,0.9709166,0.00002297826,0.0016748357,0.00038201053,0.0025833687],"genre_scores_gemma":[0.046484593,0.018228207,0.010166649,0.044831928,0.51291704,0.00032165414,0.008501271,0.0030550715,0.35549366],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9973273,0.00032192149,0.0003375253,0.0004135052,0.0014060885,0.00019359705],"domain_scores_gemma":[0.9802438,0.0028663506,0.0007218584,0.00093228836,0.014532331,0.00070344505],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023927768,0.0023142311,0.001813608,0.0033101612,0.002123164,0.004028213,0.003084283,0.0047464767,0.067813106],"category_scores_gemma":[0.042105168,0.00077290455,0.0015508994,0.0023717238,0.002220377,0.002205112,0.0020748482,0.0071635717,0.03711299],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000034993926,0.000004520108,0.00005895718,0.00019649451,0.000013296669,0.00014313518,0.00003954425,0.000104749,0.00007514141,0.0008392433,0.99255097,0.0059390925],"study_design_scores_gemma":[0.000028954288,0.00001835409,0.00062026014,0.00027070218,0.000031542004,0.00041160468,0.000109274006,0.00044428554,0.00045538653,0.0008886647,0.9966893,0.00003166845],"about_ca_topic_score_codex":0.020744896,"about_ca_topic_score_gemma":0.016990732,"teacher_disagreement_score":0.067813106,"about_ca_system_score_codex":0.0027719238,"about_ca_system_score_gemma":0.0042263586,"threshold_uncertainty_score":0.22685742},"labels":[],"label_agreement":null},{"id":"W4415259607","doi":"10.1007/978-3-031-97693-3","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 6","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004613379399863161,"score_gpt":0.1756732777603878,"score_spread":0.17105989836052463,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415259607","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031591393,0.018311223,0.0033183072,0.026789134,0.06489598,0.00019126514,0.005461331,0.00078439346,0.87708914],"genre_scores_gemma":[0.0030448253,0.004434375,0.00081292226,0.0005370977,0.000842364,0.000024321645,0.001763384,0.00016389243,0.9883768],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983999,0.000084325016,0.000027817334,0.000083923005,0.0011869452,0.00021702117],"domain_scores_gemma":[0.9977435,0.000071651986,0.000023155026,0.0000548903,0.0016466675,0.00046022423],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015842038,0.0012522014,0.00090165937,0.0020360588,0.0026492681,0.0053858343,0.0014006278,0.0019288219,0.3142638],"category_scores_gemma":[0.0016823587,0.00047433947,0.0005411854,0.0023959535,0.0010367878,0.0014866111,0.0019365443,0.0018998194,0.11411974],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001848596,0.000020784604,0.00011894056,0.00004919295,0.000002786654,0.000017175684,0.000024308214,0.00009310154,0.0002267345,0.0012080157,0.9699079,0.028312545],"study_design_scores_gemma":[0.0000034447885,0.000005400272,0.0005939023,0.000040314102,0.000003712059,0.000012855826,0.0000863714,0.00012810306,0.0001399778,0.00043811556,0.9985416,0.000006233942],"about_ca_topic_score_codex":0.4195259,"about_ca_topic_score_gemma":0.70212984,"teacher_disagreement_score":0.9924739,"about_ca_system_score_codex":0.0075260974,"about_ca_system_score_gemma":0.024958976,"threshold_uncertainty_score":0.9781195},"labels":[],"label_agreement":null},{"id":"W4415354881","doi":"10.1016/j.eswa.2025.130050","title":"A multi-user game-based system for planning modular construction activities","year":2025,"lang":"en","type":"article","venue":"Expert Systems with Applications","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada; Alberta Innovates","keywords":"Modular design; Key (lock); Usability; Limiting; Protocol (science); Mode (computer interface); Modular construction","score_opus":0.009885647539409665,"score_gpt":0.23777627739242801,"score_spread":0.22789062985301836,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415354881","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.12568086,0.000140556,0.8420138,0.00018571307,0.0000852564,0.0017919854,0.0006230313,0.016269414,0.013209418],"genre_scores_gemma":[0.5235862,0.00011341993,0.46761653,0.00014903494,0.000017256143,0.0011497077,0.0008599916,0.00022656246,0.0062813195],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99947363,0.00018257197,0.000052369236,0.00011598407,0.000121469384,0.000054021206],"domain_scores_gemma":[0.9990926,0.0004099708,0.00006748409,0.00014910445,0.00012144484,0.00015936077],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009410643,0.0010739384,0.0004591238,0.00079059636,0.00037488996,0.0010290772,0.0018042626,0.00078140927,0.008087037],"category_scores_gemma":[0.0023323381,0.0003580263,0.000497927,0.00031076986,0.00044177525,0.000989741,0.001817489,0.00053741055,0.0011221252],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.003909358,0.002879666,0.019254053,0.0014047527,0.00043066303,0.0026165976,0.0043317676,0.20260519,0.13960777,0.033753723,0.017289773,0.57191664],"study_design_scores_gemma":[0.00034520088,0.000813603,0.005182336,0.00008850852,0.00013029738,0.00053700386,0.0003334094,0.92642105,0.019114977,0.007606759,0.039288495,0.00013828216],"about_ca_topic_score_codex":0.0028709099,"about_ca_topic_score_gemma":0.004093966,"teacher_disagreement_score":0.008087037,"about_ca_system_score_codex":0.0005826284,"about_ca_system_score_gemma":0.0007830946,"threshold_uncertainty_score":0.027053833},"labels":[],"label_agreement":null},{"id":"W4415438371","doi":"10.1007/978-3-031-97435-9_12","title":"Influence of Loading Angle on the Performance of Registration Pin Connection in VectorBloc Modular Construction System","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Windsor","funders":"","keywords":"Cable gland; Thread (computing); Modular design; Welding; Troubleshooting; Failure mode and effects analysis","score_opus":0.004972810775130084,"score_gpt":0.17106911654574677,"score_spread":0.16609630577061668,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415438371","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98889005,0.0002453361,0.0055894265,0.00002925579,0.000047296195,0.000012655447,0.000088879,0.00027190984,0.0048252987],"genre_scores_gemma":[0.998844,0.00003743586,0.0002615657,0.0000036705533,0.0000026918703,0.000002573502,0.00006039402,0.0000180733,0.00076939503],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99941504,0.000095888565,0.000032466865,0.00010698989,0.00018084676,0.0001687617],"domain_scores_gemma":[0.9989379,0.0004272758,0.00013263212,0.00011054934,0.00032186255,0.0000697633],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050177466,0.0005183,0.00048831006,0.0006201554,0.0005061209,0.00080016983,0.0006005478,0.00060944114,0.0062757134],"category_scores_gemma":[0.0013952805,0.0002527507,0.00029445082,0.0006657572,0.00042853368,0.00071891677,0.00047242054,0.00028908066,0.001143882],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0077345246,0.0005809114,0.01884706,0.0008308706,0.00008752394,0.0008866754,0.0010460146,0.26139292,0.5656315,0.0018975753,0.003464222,0.13760014],"study_design_scores_gemma":[0.00010299368,0.00639592,0.09874224,0.00010790321,0.0004393762,0.00056447857,0.0017999122,0.41564947,0.47012332,0.00088593806,0.0050158747,0.00017254594],"about_ca_topic_score_codex":0.0013511453,"about_ca_topic_score_gemma":0.001479249,"teacher_disagreement_score":0.0062757134,"about_ca_system_score_codex":0.00032530402,"about_ca_system_score_gemma":0.0002775553,"threshold_uncertainty_score":0.020994365},"labels":[],"label_agreement":null},{"id":"W4415467310","doi":"10.18502/jewes.v1i1.18838","title":"Decarbonizing the Cement Industry: A Comprehensive Analysis of Renewable Energy Pathways and GHG Emissions in the UAE","year":2025,"lang":"","type":"article","venue":"Journal of Excellence in Wellness and Environmental Studies","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Renewable energy; Greenhouse gas; Fossil fuel; Electricity; Sustainability; Natural gas; Climate change; Climate change mitigation; Electricity generation","score_opus":0.021384445990101843,"score_gpt":0.23851954840592995,"score_spread":0.21713510241582812,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415467310","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99230677,0.0009842,0.002249628,0.00019721767,0.0000048727793,0.000030337733,0.0009656149,0.00003513075,0.0032261736],"genre_scores_gemma":[0.9953141,0.0008070535,0.0026932089,0.000033648226,0.0000041031863,0.000012680645,0.00060084957,0.000010509558,0.00052368315],"study_design_codex":"observational","study_design_gemma":"not_applicable","domain_scores_codex":[0.99980134,0.000039886934,0.000010382133,0.000022868517,0.000082664126,0.000042851978],"domain_scores_gemma":[0.9997477,0.000057674624,0.00005606653,0.000015379892,0.000093712435,0.000029516314],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0004933853,0.0004154207,0.00031599854,0.0021253424,0.00037225548,0.0009799475,0.00017544704,0.00035886283,0.0006956845],"category_scores_gemma":[0.00065214274,0.00016702122,0.0005674149,0.0027646455,0.00023349021,0.00072765886,0.00050794875,0.00030049458,0.00010131313],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001898612,0.00040959482,0.6388648,0.00047869017,0.00079871033,0.0012831843,0.00070363603,0.22256584,0.010867859,0.011780422,0.0019962105,0.11006124],"study_design_scores_gemma":[0.000013166379,0.00024320051,0.82995826,0.00016909424,0.00023875624,0.00030382094,0.00330671,0.1326542,0.007658737,0.002717014,0.022667112,0.000070002076],"about_ca_topic_score_codex":0.04957843,"about_ca_topic_score_gemma":0.08239164,"teacher_disagreement_score":0.04957843,"about_ca_system_score_codex":0.0011021285,"about_ca_system_score_gemma":0.0011204686,"threshold_uncertainty_score":0.098579705},"labels":[],"label_agreement":null},{"id":"W4415555245","doi":"10.1007/978-3-031-95115-2","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 16","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004601092835838849,"score_gpt":0.17568753404030255,"score_spread":0.1710864412044637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415555245","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032826709,0.017591033,0.0033295115,0.025674464,0.055307634,0.00018238217,0.0064418516,0.0008288367,0.8873616],"genre_scores_gemma":[0.0029307671,0.00402891,0.0007644473,0.0004542212,0.000634032,0.000022375702,0.0018175399,0.00016347597,0.98918414],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99847263,0.00007813428,0.000026921438,0.00008294126,0.0011211208,0.00021828598],"domain_scores_gemma":[0.9979905,0.00006478124,0.00002143211,0.000052501644,0.0014579716,0.00041282628],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015671463,0.0012723452,0.00094041595,0.0020213674,0.0027862752,0.005382262,0.0013875477,0.0018538993,0.3111006],"category_scores_gemma":[0.0016224032,0.00049816794,0.0005291137,0.0024469073,0.001123974,0.0015171848,0.0019954161,0.0018200914,0.10373608],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001925323,0.000019617113,0.00012566289,0.000047711408,0.0000028442748,0.00001637957,0.000026598687,0.00009953001,0.00021090223,0.0013532892,0.9695608,0.028517505],"study_design_scores_gemma":[0.0000035018065,0.0000051424304,0.00058008253,0.000038333652,0.0000037190393,0.000011323985,0.000091317066,0.00013495983,0.0001428316,0.00049443194,0.9984882,0.000006141462],"about_ca_topic_score_codex":0.4946984,"about_ca_topic_score_gemma":0.76036704,"teacher_disagreement_score":0.5053016,"about_ca_system_score_codex":0.008596995,"about_ca_system_score_gemma":0.029308066,"threshold_uncertainty_score":0.98363787},"labels":[],"label_agreement":null},{"id":"W4415598957","doi":"10.1115/detc2025-169608","title":"A Lightweight Multi-Expert Generative Language Model System for Engineering Information and Knowledge Extraction","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"McGill University","funders":"","keywords":"Inference; Adaptation (eye); Generative grammar; Graph; Process (computing); Key (lock); Domain (mathematical analysis); Toolbox; Metric (unit)","score_opus":0.00858699833317431,"score_gpt":0.24557342709132196,"score_spread":0.23698642875814765,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415598957","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013055583,0.0000860337,0.9380611,0.00014305604,0.000046191366,0.00013338205,0.00036291455,0.046256192,0.0018556152],"genre_scores_gemma":[0.28860015,0.00015658849,0.69934475,0.00036445778,0.000029865832,0.0002560785,0.0029494476,0.002282517,0.006016184],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9992493,0.00022410364,0.00004964629,0.00022223055,0.00021876869,0.00003589069],"domain_scores_gemma":[0.99869174,0.0005727223,0.00006402522,0.00042028225,0.00019397528,0.000057321868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012608309,0.0008470809,0.00058312924,0.0012024805,0.00038342463,0.0010900783,0.00208217,0.0010999166,0.005745355],"category_scores_gemma":[0.003508763,0.0004891726,0.0010581863,0.00067885104,0.0005229845,0.0022144343,0.0020923933,0.001290123,0.0034297686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00042837366,0.0004281948,0.0021687062,0.00043617052,0.00020481022,0.00086910755,0.0007981968,0.21076398,0.049213592,0.015851477,0.018759087,0.70007837],"study_design_scores_gemma":[0.000028262004,0.00004581268,0.00026141157,0.000012337586,0.000025702924,0.0001173081,0.000050788614,0.9724999,0.009512673,0.008072724,0.009342607,0.000030461824],"about_ca_topic_score_codex":0.0040237717,"about_ca_topic_score_gemma":0.007861351,"teacher_disagreement_score":0.005745355,"about_ca_system_score_codex":0.0007226625,"about_ca_system_score_gemma":0.0008350501,"threshold_uncertainty_score":0.019220114},"labels":[],"label_agreement":null},{"id":"W4415749548","doi":"10.2316/j.2025.203-0601","title":"BUILDING ENERGY MANAGEMENT SYSTEM OPTIMISATION–BASED ON BIM TECHNOLOGY, 89-100","year":2025,"lang":"en","type":"article","venue":"International Journal of Power and Energy Systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Energy management; Management system; Energy (signal processing); Operation planning; Maintenance engineering","score_opus":0.0035154510730651353,"score_gpt":0.20905701670397234,"score_spread":0.2055415656309072,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415749548","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.1852443,0.0011792318,0.678321,0.00051376893,0.00016813629,0.00031845894,0.0011694642,0.0020276683,0.13105798],"genre_scores_gemma":[0.8739295,0.00058894727,0.112925105,0.00003411056,0.00001645595,0.000121483354,0.0009579828,0.00028648044,0.011140071],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99914336,0.00025272043,0.00003945066,0.00006841354,0.0004282319,0.00006787752],"domain_scores_gemma":[0.999689,0.00010146794,0.000022271977,0.000056174445,0.000119399956,0.000011710054],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0011695247,0.0007886882,0.0009565267,0.0014967866,0.0006212226,0.0021775642,0.0005969421,0.00060745236,0.0073856586],"category_scores_gemma":[0.0015413249,0.0005495711,0.00094745925,0.0018951496,0.00041194723,0.0013999648,0.0007697263,0.0005623759,0.0016677363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002210053,0.00023418758,0.0034092474,0.00022369341,0.00008063737,0.00007347594,0.00006975568,0.7619487,0.010208351,0.011678076,0.002857246,0.20899558],"study_design_scores_gemma":[0.000021360494,0.000077634686,0.0054545286,0.000037238628,0.00004168464,0.00006420864,0.00010589769,0.9677407,0.012767855,0.0061157574,0.007550379,0.00002269292],"about_ca_topic_score_codex":0.004494745,"about_ca_topic_score_gemma":0.0071141534,"teacher_disagreement_score":0.0073856586,"about_ca_system_score_codex":0.0010500667,"about_ca_system_score_gemma":0.0012376574,"threshold_uncertainty_score":0.024707556},"labels":[],"label_agreement":null},{"id":"W4415764122","doi":"10.29173/mocs312","title":"Interdependence between Factors Influencing the Selection of Project Delivery Systems and Modular Construction","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Context (archaeology); Ambiguity; Selection (genetic algorithm); Modular design; Pre-construction services; Project management; Construction management; Project management triangle","score_opus":0.01006478965792922,"score_gpt":0.21383549293992637,"score_spread":0.20377070328199715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764122","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.63491637,0.28246018,0.034678552,0.005747764,0.00034739266,0.0027342746,0.0010936487,0.000078224904,0.037943564],"genre_scores_gemma":[0.9259052,0.05105652,0.020480521,0.00036498922,0.000056926838,0.0007475527,0.00023943151,0.00003362231,0.0011151225],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.95342827,0.027305542,0.006990193,0.001967694,0.009291361,0.001016941],"domain_scores_gemma":[0.7686764,0.19198805,0.025045801,0.0018688749,0.011124126,0.0012967801],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.032234553,0.00044855048,0.0008021608,0.0049278317,0.0011497742,0.0040272838,0.0009755317,0.0009915857,0.0029767642],"category_scores_gemma":[0.10591618,0.0005075151,0.0013302827,0.008273565,0.0017577024,0.0037647574,0.0016503887,0.0008982645,0.0003701187],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060231757,0.00025693048,0.28784397,0.085696146,0.0018043432,0.0014723066,0.024775106,0.0027424064,0.0026309155,0.013852295,0.0031614234,0.5751619],"study_design_scores_gemma":[0.0001726161,0.0011110577,0.7253794,0.069180824,0.004122273,0.0033386657,0.065062344,0.002832389,0.0041890503,0.016463323,0.10780186,0.00034618354],"about_ca_topic_score_codex":0.0047487365,"about_ca_topic_score_gemma":0.010181401,"teacher_disagreement_score":0.032234553,"about_ca_system_score_codex":0.003570263,"about_ca_system_score_gemma":0.008784658,"threshold_uncertainty_score":0.17047465},"labels":[],"label_agreement":null},{"id":"W4415764123","doi":"10.29173/mocs317","title":"Barriers and Potential Solutions to the Adoption of Modular and Offsite Construction: A Review","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Flexibility (engineering); Modular design; Foundation (evidence); Key (lock); Sustainability; Field (mathematics)","score_opus":0.00585997719051752,"score_gpt":0.20008737709929617,"score_spread":0.19422739990877866,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764123","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00088623393,0.9952199,0.00033306653,0.0018598977,0.00018231684,0.000021914113,0.000016765911,0.000006980159,0.0014729175],"genre_scores_gemma":[0.00539006,0.99341595,0.0005052606,0.00041831742,0.00006340755,0.000027426511,0.000020668193,0.0000032921498,0.00015560762],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99659365,0.0009874267,0.00078799936,0.00031685815,0.0010760007,0.00023798822],"domain_scores_gemma":[0.9817478,0.013816785,0.0017891575,0.00013854475,0.0021949017,0.00031279717],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057849535,0.0008878342,0.0013619342,0.0058755293,0.00095015083,0.00339517,0.0017414404,0.0024250331,0.002569361],"category_scores_gemma":[0.014409147,0.00069948076,0.0013240655,0.006520355,0.0018384552,0.0036623736,0.0017820393,0.0020676325,0.00042792058],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053523305,0.00012620783,0.0018385553,0.13573645,0.00024927148,0.00027620982,0.0026399028,0.0006714059,0.00048364353,0.02093362,0.014731543,0.8222596],"study_design_scores_gemma":[0.000018121173,0.00018155624,0.0059941965,0.21100208,0.0009572785,0.0014930279,0.0069013666,0.0004438943,0.0008884619,0.0051517226,0.7668706,0.000097804],"about_ca_topic_score_codex":0.009556248,"about_ca_topic_score_gemma":0.01756712,"teacher_disagreement_score":0.009556248,"about_ca_system_score_codex":0.0028615042,"about_ca_system_score_gemma":0.012445235,"threshold_uncertainty_score":0.03059417},"labels":[],"label_agreement":null},{"id":"W4415764125","doi":"10.29173/mocs310","title":"Decarbonization of Modular Construction and LEED v5 Certification","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"California State University, Sacramento","keywords":"Demolition; Certification; Embodied energy; Greenhouse gas; Modular design; Resource efficiency; Sustainability; Life-cycle assessment; Carbon footprint","score_opus":0.006101554106341071,"score_gpt":0.19626254823648398,"score_spread":0.1901609941301429,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764125","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.79403305,0.0023993924,0.057689127,0.00087333826,0.00038479475,0.00078443426,0.0007998734,0.0008076074,0.14222851],"genre_scores_gemma":[0.967573,0.00070504856,0.018014051,0.00015079635,0.000021654028,0.00010652339,0.00049014384,0.000057156143,0.012881626],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9988078,0.00014017102,0.000044347187,0.00012180918,0.0006648796,0.00022113239],"domain_scores_gemma":[0.9994388,0.000051357274,0.00015141342,0.00009074202,0.00020116643,0.00006655995],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006890732,0.0003733679,0.00018732475,0.0012616147,0.0004259256,0.00085851643,0.0006594867,0.0005368328,0.004789602],"category_scores_gemma":[0.0012254822,0.00013422263,0.0004852338,0.00077609805,0.0005201094,0.0006376025,0.0012190691,0.0005239412,0.00060758815],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065559545,0.0011611584,0.03646381,0.0018159045,0.00007103928,0.0020171378,0.000796036,0.053559072,0.16478287,0.055649847,0.014252526,0.6687751],"study_design_scores_gemma":[0.0001960905,0.0039951247,0.14086537,0.00080156676,0.00018438576,0.0022396483,0.0019419722,0.05950197,0.31726122,0.015736727,0.45702994,0.0002460216],"about_ca_topic_score_codex":0.0037606764,"about_ca_topic_score_gemma":0.008500048,"teacher_disagreement_score":0.004789602,"about_ca_system_score_codex":0.0012881947,"about_ca_system_score_gemma":0.0014569799,"threshold_uncertainty_score":0.016022801},"labels":[],"label_agreement":null},{"id":"W4415764132","doi":"10.29173/mocs309","title":"A Data-Driven Framework for Automated Generation of PC Component Trailer Arrival Times: Integrating Work Interruptions Simulation and Duration Prediction","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"Ministry of Science and ICT, South Korea; National Research Foundation of Korea; National Research Foundation","keywords":"Component (thermodynamics); Duration (music); Arrival time; Work (physics); Precast concrete; Intuition","score_opus":0.035211647481511385,"score_gpt":0.2800561496355948,"score_spread":0.24484450215408338,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764132","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0025459472,0.000031096588,0.99468875,0.00004383365,0.000011007421,0.00006884876,0.0002168197,0.0017692697,0.00062432786],"genre_scores_gemma":[0.18292892,0.00012694387,0.8142489,0.00005343861,0.000027165719,0.0004010811,0.0011374005,0.00035867508,0.00071743125],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988121,0.0002674132,0.000115910734,0.00025876542,0.0004485845,0.0000973702],"domain_scores_gemma":[0.99698514,0.0015454732,0.00029220022,0.00033793357,0.00065393036,0.00018525084],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0029110624,0.0013603987,0.0012230154,0.0020648243,0.00072083634,0.0025066123,0.0027674444,0.0011092938,0.0028075913],"category_scores_gemma":[0.0065481337,0.00087130046,0.0014985915,0.0012225704,0.0006841691,0.0014577799,0.0017221032,0.0016970139,0.0007778654],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009922907,0.0001608418,0.0023608115,0.00013490379,0.00007115408,0.00012818229,0.00022737513,0.9156219,0.002540647,0.015786523,0.0016777717,0.061190616],"study_design_scores_gemma":[0.000008950317,0.000012406475,0.00012551204,0.00001461281,0.0000075708895,0.000015701662,0.000016627382,0.9935282,0.000826453,0.0041548703,0.0012762215,0.000012818354],"about_ca_topic_score_codex":0.017882967,"about_ca_topic_score_gemma":0.02008677,"teacher_disagreement_score":0.017882967,"about_ca_system_score_codex":0.0014179257,"about_ca_system_score_gemma":0.0029945252,"threshold_uncertainty_score":0.035557747},"labels":[],"label_agreement":null},{"id":"W4415764146","doi":"10.29173/mocs316","title":"Research Trends in Affordable Modular Housing","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Modular design; Workforce; Bridge (graph theory); Housing industry; Affordable housing; Key (lock); Thematic analysis","score_opus":0.017219948824789198,"score_gpt":0.27059377251128985,"score_spread":0.25337382368650063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764146","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.2670061,0.3439305,0.01666908,0.1857962,0.003449899,0.00019680201,0.0009903421,0.00013783548,0.18182328],"genre_scores_gemma":[0.802966,0.16505024,0.01006203,0.00872286,0.0021882888,0.00020691358,0.0006094441,0.000113225855,0.010081019],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98895824,0.0037375798,0.0007959475,0.001970156,0.003833058,0.00070502714],"domain_scores_gemma":[0.9497813,0.03410799,0.0042071124,0.0014285431,0.009075061,0.0013999956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021104997,0.0002669931,0.00047019092,0.0064280503,0.0014877773,0.0061524264,0.001467184,0.0019883977,0.0077065863],"category_scores_gemma":[0.03452246,0.00035181723,0.00044184516,0.017891135,0.0050875163,0.010775089,0.0041934536,0.0023357093,0.0006879862],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012700672,0.00013349764,0.024363799,0.008012495,0.000055976645,0.0006073696,0.07108263,0.00076494407,0.0017261254,0.38760224,0.023142535,0.48238146],"study_design_scores_gemma":[0.000014939093,0.00027640277,0.06134501,0.009415155,0.000051082705,0.000878126,0.09695873,0.0010868245,0.0016840857,0.032638773,0.7955859,0.00006501517],"about_ca_topic_score_codex":0.0067352788,"about_ca_topic_score_gemma":0.008920375,"teacher_disagreement_score":0.021104997,"about_ca_system_score_codex":0.0063131354,"about_ca_system_score_gemma":0.00918432,"threshold_uncertainty_score":0.11161518},"labels":[],"label_agreement":null},{"id":"W4415764156","doi":"10.29173/mocs318","title":"A Rapid Literature Review of Environmental Performance of Offsite Building Construction Industry","year":2025,"lang":"","type":"article","venue":"Modular and Offsite Construction (MOC) Summit Proceedings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Greenhouse gas; Construction industry; Life-cycle assessment; Foundation (evidence); Modular construction","score_opus":0.003960116945552411,"score_gpt":0.1904519762553096,"score_spread":0.1864918593097572,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415764156","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.002046977,0.99053544,0.00040680243,0.001851485,0.00034075623,0.000021278585,0.0003934154,0.000016441798,0.004387447],"genre_scores_gemma":[0.009925275,0.9876122,0.00066054286,0.00076177233,0.00020917399,0.000022098897,0.000352918,0.000010303427,0.00044566963],"study_design_codex":"design_other","study_design_gemma":"systematic_review","domain_scores_codex":[0.99689794,0.00077600393,0.0006504016,0.0003819893,0.0011390017,0.0001546861],"domain_scores_gemma":[0.97084856,0.019602902,0.0020153765,0.000468596,0.0066966885,0.0003677921],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.004303957,0.0008181616,0.0014854388,0.024197001,0.00072389387,0.0031256403,0.0010829268,0.0015461899,0.005091266],"category_scores_gemma":[0.0136225335,0.0004999311,0.0018356888,0.03002806,0.0010064198,0.004086146,0.0011979418,0.001495444,0.00092638034],"study_design_candidate":"systematic_review","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008826797,0.000076315286,0.0034969572,0.18710692,0.0004608304,0.00040733273,0.0014869403,0.0008511106,0.0013094089,0.009465068,0.052122157,0.74312866],"study_design_scores_gemma":[0.000009213945,0.00014093048,0.024823904,0.24064352,0.0014652382,0.00094700063,0.0035696258,0.0003422983,0.0009694503,0.003167474,0.7238365,0.0000848327],"about_ca_topic_score_codex":0.012544796,"about_ca_topic_score_gemma":0.027130673,"teacher_disagreement_score":0.024197001,"about_ca_system_score_codex":0.003819941,"about_ca_system_score_gemma":0.01043842,"threshold_uncertainty_score":0.027715743},"labels":[],"label_agreement":null},{"id":"W4415817208","doi":"10.3390/buildings15213942","title":"A Cloud-Driven Framework for Automated BIM Quantity Takeoff and Quality Control: Case Study Insights","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; Concordia University","funders":"","keywords":"Scalability; Reliability (semiconductor); Takeoff; Consistency (knowledge bases); Quality (philosophy); Building information modeling; Verification and validation","score_opus":0.019605893180252118,"score_gpt":0.3030548953418662,"score_spread":0.28344900216161406,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415817208","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051815994,0.0004280043,0.93555343,0.0014294662,0.00007170769,0.0008859351,0.00048185856,0.002824295,0.0065092426],"genre_scores_gemma":[0.40578842,0.0002602288,0.59191895,0.00016774623,0.000026809748,0.00035540693,0.00049402297,0.00019245283,0.0007960111],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99484116,0.002129201,0.00034352648,0.00055222027,0.0017520259,0.00038192383],"domain_scores_gemma":[0.9915264,0.003562217,0.00068486534,0.0019013082,0.0018816354,0.00044358027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008765239,0.00073194026,0.0007136287,0.0018181716,0.0013975718,0.0035613922,0.0026399624,0.0014368452,0.0020544191],"category_scores_gemma":[0.014246131,0.00048793596,0.0008267794,0.0019284181,0.0014905278,0.0030570158,0.003425612,0.0014712785,0.00048127273],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006923929,0.00127523,0.030326096,0.0008570765,0.00018207195,0.0023255656,0.004350336,0.44139904,0.015891887,0.21575288,0.01273506,0.27421233],"study_design_scores_gemma":[0.000060112583,0.00010630227,0.0030753838,0.00011902316,0.000037296046,0.00033524467,0.0005665966,0.95595324,0.004242059,0.020592669,0.014851175,0.000060899012],"about_ca_topic_score_codex":0.02125636,"about_ca_topic_score_gemma":0.021996686,"teacher_disagreement_score":0.02125636,"about_ca_system_score_codex":0.003013366,"about_ca_system_score_gemma":0.0050546285,"threshold_uncertainty_score":0.046355546},"labels":[],"label_agreement":null},{"id":"W4415878985","doi":"10.1016/j.autcon.2025.106644","title":"Automating clash relevance filtering in BIM-based multidisciplinary coordination using machine learning","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Metadata; Context (archaeology); Identification (biology); Process (computing); Relevance (law); Software; Building information modeling; Quality (philosophy)","score_opus":0.009241363043894509,"score_gpt":0.24783937004757484,"score_spread":0.23859800700368033,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4415878985","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.029348593,0.00008122966,0.9604908,0.00019081791,0.00003579131,0.00021478227,0.00008320094,0.007296607,0.0022580565],"genre_scores_gemma":[0.35130557,0.00008825579,0.6445582,0.00014292265,0.000024700788,0.0001873998,0.0005094993,0.0006020643,0.0025814576],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9947207,0.001312795,0.00034106433,0.0011823621,0.0020920206,0.00035116292],"domain_scores_gemma":[0.99142104,0.003013409,0.00091560505,0.0023589577,0.0019971854,0.00029374353],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0073774303,0.0011077663,0.00145722,0.004020148,0.0016131748,0.0033101598,0.0024228757,0.0012340301,0.0032750864],"category_scores_gemma":[0.01474814,0.0008796687,0.0012174607,0.0021957995,0.0011967334,0.0035399694,0.005724069,0.0015466352,0.0018574604],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00041091014,0.00048120276,0.015246576,0.00044337072,0.00011824114,0.0002868158,0.003224745,0.09019983,0.026642362,0.00821849,0.0051707565,0.8495566],"study_design_scores_gemma":[0.00004836319,0.00021087278,0.010715,0.0001383485,0.00006453836,0.00027126484,0.0015968243,0.900075,0.048048813,0.020312823,0.0184187,0.000099432145],"about_ca_topic_score_codex":0.006506643,"about_ca_topic_score_gemma":0.009849614,"teacher_disagreement_score":0.0073774303,"about_ca_system_score_codex":0.0014924194,"about_ca_system_score_gemma":0.0031410782,"threshold_uncertainty_score":0.039016068},"labels":[],"label_agreement":null},{"id":"W4416091646","doi":"","title":"L’adoption du BIM en architecture : état des lieux et défis futurs","year":2025,"lang":"fr","type":"book-chapter","venue":"HAL (Le Centre pour la Communication Scientifique Directe)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Architecture; Government (linguistics); Interoperability; The Internet","score_opus":0.008335573383142137,"score_gpt":0.1996070638820928,"score_spread":0.19127149049895065,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416091646","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.046660952,0.036670752,0.101516135,0.052100305,0.0022062883,0.00008165855,0.00013155019,0.000426574,0.76020575],"genre_scores_gemma":[0.5888588,0.03239059,0.07026618,0.0038864694,0.00092523615,0.00017579805,0.00028411043,0.00076267484,0.3024502],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99364495,0.0032366842,0.00013927437,0.00039764823,0.0021941308,0.0003873968],"domain_scores_gemma":[0.99709547,0.0015781921,0.0001313575,0.0003625901,0.0006966289,0.00013570275],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008757906,0.00094456505,0.00040376108,0.001969608,0.0022531352,0.010708054,0.0011584735,0.0031793085,0.0079342965],"category_scores_gemma":[0.005574803,0.0007301582,0.00061234186,0.0029148948,0.007613849,0.009548372,0.0036454205,0.0055412757,0.0017617422],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028385653,0.000038190592,0.00038690274,0.0001527797,0.000009492547,0.00020788008,0.01179346,0.0014029557,0.0012972534,0.82128644,0.01754486,0.14585142],"study_design_scores_gemma":[0.000009484556,0.000040127,0.0013615476,0.00055525976,0.000008549254,0.00045817715,0.004993001,0.0025185198,0.0014365211,0.094537795,0.89405304,0.000027984082],"about_ca_topic_score_codex":0.014993719,"about_ca_topic_score_gemma":0.015729187,"teacher_disagreement_score":0.014993719,"about_ca_system_score_codex":0.008706535,"about_ca_system_score_gemma":0.005263378,"threshold_uncertainty_score":0.06317067},"labels":[],"label_agreement":null},{"id":"W4416108550","doi":"10.1061/jmenea.meeng-7068","title":"Forecasting Construction Equipment Productivity Based on Weather Conditions: A Data-Driven Time-Series Machine Learning Approach","year":2025,"lang":"en","type":"article","venue":"Journal of Management in Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Productivity; Leverage (statistics); Construction management; Field (mathematics); Autoregressive model; Project management; Automation; Construction industry","score_opus":0.014199284189216642,"score_gpt":0.2140958393359872,"score_spread":0.19989655514677054,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416108550","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.47657773,0.000582649,0.51701903,0.00065005606,0.000106853004,0.00010376034,0.0012299599,0.0010907798,0.0026392106],"genre_scores_gemma":[0.9628773,0.0002227622,0.03546931,0.00003220071,0.000039205963,0.0000591621,0.000715786,0.00002006149,0.0005643147],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999684,0.000087091415,0.000031011492,0.000092596645,0.00007141584,0.000033939556],"domain_scores_gemma":[0.99912685,0.00048381902,0.00013681433,0.000057188186,0.00015930863,0.000035984653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009817648,0.00067568093,0.0005489256,0.0014505169,0.00017639344,0.0007997596,0.0007912517,0.0007516103,0.00059829716],"category_scores_gemma":[0.002476148,0.00033548332,0.00058221404,0.001321281,0.00019191855,0.00085545995,0.0003588045,0.0007058151,0.00017770515],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000058969927,0.00015219,0.013898284,0.000059212314,0.00008252589,0.00010272531,0.00005799454,0.9284931,0.0015079502,0.0013002506,0.00061636657,0.053670507],"study_design_scores_gemma":[0.0000015126111,0.000007948306,0.0018146315,0.0000029483801,0.0000054873526,0.0000052286387,0.000011285213,0.9974667,0.00019007403,0.00038759867,0.00010295113,0.00000371729],"about_ca_topic_score_codex":0.011918542,"about_ca_topic_score_gemma":0.010159846,"teacher_disagreement_score":0.011918542,"about_ca_system_score_codex":0.00062477955,"about_ca_system_score_gemma":0.0004868776,"threshold_uncertainty_score":0.02369833},"labels":[],"label_agreement":null},{"id":"W4416133335","doi":"10.1177/13694332251394825","title":"Capacity and failure mode prediction of long-bolted connection in panelized modular houses","year":2025,"lang":"en","type":"article","venue":"Advances in Structural Engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Lakehead University","funders":"","keywords":"Modular design; Finite element method; Moment (physics); Failure mode and effects analysis; Parametric statistics; Connection (principal bundle); Process (computing); Mode (computer interface)","score_opus":0.004198056075830747,"score_gpt":0.20673210726765942,"score_spread":0.20253405119182868,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416133335","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9879048,0.000021361187,0.011532352,0.0000055711394,0.000002552174,0.000007025963,0.000066421184,0.0000953205,0.0003645034],"genre_scores_gemma":[0.99839765,0.000009109592,0.0013706302,6.565777e-7,5.114047e-7,0.000003852233,0.00006411963,0.0000067734904,0.0001467783],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99980205,0.000036986887,0.000008123174,0.000054040916,0.00006239778,0.000036328303],"domain_scores_gemma":[0.9992428,0.00032840107,0.00017745195,0.000066857574,0.00013698517,0.000047551803],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00069220184,0.00060293573,0.00030042153,0.0011611201,0.00024006171,0.000337248,0.000527671,0.00051426643,0.0011950907],"category_scores_gemma":[0.0015769798,0.00033515008,0.00036448234,0.0004113194,0.0004060266,0.00037000104,0.00034014258,0.00026889375,0.0003511471],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002028503,0.0001129243,0.06399983,0.000043630378,0.000026445025,0.0002515371,0.00011809031,0.8918468,0.023870321,0.00027841105,0.0001892889,0.019059932],"study_design_scores_gemma":[0.0000032149228,0.0001572166,0.041733537,0.0000074621057,0.000011229897,0.00005762764,0.00005797271,0.9503468,0.0073505873,0.00013152395,0.00012543774,0.000017356453],"about_ca_topic_score_codex":0.0047062077,"about_ca_topic_score_gemma":0.0059846374,"teacher_disagreement_score":0.0047062077,"about_ca_system_score_codex":0.00043272678,"about_ca_system_score_gemma":0.00025011806,"threshold_uncertainty_score":0.009357631},"labels":[],"label_agreement":null},{"id":"W4416273186","doi":"10.1061/jcemd4.coeng-16899","title":"Enhancing Circularity in the Building Industry: A Review of Material Passports and Digital Twin Technologies","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo; National Research Council Canada","funders":"","keywords":"Reuse; Scalability; Key (lock); Emerging technologies; The Internet; Systematic review","score_opus":0.003023970041466548,"score_gpt":0.19320125097995616,"score_spread":0.19017728093848962,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416273186","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00020834227,0.9987264,0.00018875796,0.00030714093,0.00007814572,0.000027651493,0.000040616967,0.0000032986093,0.00041973966],"genre_scores_gemma":[0.002094494,0.9969382,0.00045711978,0.00031633594,0.000041116007,0.000045593642,0.000039894465,0.0000026559267,0.00006452166],"study_design_codex":"systematic_review","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942932,0.0018493847,0.0018035091,0.00051926053,0.0013377671,0.00019697125],"domain_scores_gemma":[0.97173226,0.022711731,0.0027157408,0.00037281,0.002201199,0.00026632557],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006927506,0.0012875422,0.0030922971,0.011918076,0.0007409263,0.0036139057,0.0016555839,0.0023687356,0.003707487],"category_scores_gemma":[0.021358145,0.0008402101,0.0039841975,0.012936355,0.0014109825,0.00443104,0.0018130505,0.0018286338,0.0005551023],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008843268,0.000060568564,0.0005442932,0.65044457,0.0010071452,0.00016315705,0.0008985087,0.0003857545,0.00042642566,0.005762206,0.005118519,0.33510044],"study_design_scores_gemma":[0.000032856467,0.00021824587,0.0030115647,0.69005066,0.005859559,0.0006771948,0.0010615417,0.00018319121,0.0003628255,0.0031582303,0.29532468,0.000059510243],"about_ca_topic_score_codex":0.0075754058,"about_ca_topic_score_gemma":0.017772838,"teacher_disagreement_score":0.011918076,"about_ca_system_score_codex":0.0027408756,"about_ca_system_score_gemma":0.015240741,"threshold_uncertainty_score":0.03663659},"labels":[],"label_agreement":null},{"id":"W4416276869","doi":"10.2139/ssrn.5758912","title":"Transportation-induced acceleration and shear deformation responses of volumetric steel modules with light-framed gypsum walls: Road test results","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université de Sherbrooke","funders":"","keywords":"Modular design; Serviceability (structure); Accelerometer; Acceleration; Shear (geology); Truck","score_opus":0.009093066814779867,"score_gpt":0.22175700423733208,"score_spread":0.2126639374225522,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416276869","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9973967,0.00002571934,0.0015251967,0.000012365061,0.000008085945,0.000009671888,0.0002556266,0.000100305115,0.0006663177],"genre_scores_gemma":[0.9985001,0.000020906653,0.00033694698,0.0000046740647,0.0000014293646,0.0000074226805,0.00023642933,0.00001817469,0.0008739027],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9996537,0.00004198177,0.00001813974,0.00006443276,0.00011830921,0.00010345086],"domain_scores_gemma":[0.99959666,0.00008529365,0.000051406943,0.00006315737,0.00013973657,0.000063738735],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00036372337,0.00059457147,0.00043262244,0.0005986,0.000294621,0.00027198004,0.00077299296,0.0007902172,0.0042160726],"category_scores_gemma":[0.0005840373,0.00023053198,0.00064814894,0.0005825765,0.0005256988,0.00042345218,0.00040022115,0.00034551282,0.00090752455],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00485472,0.00058575434,0.012394137,0.00026172784,0.00008833849,0.0007538552,0.00068413146,0.06555149,0.8835157,0.000579979,0.0011773418,0.029552693],"study_design_scores_gemma":[0.00013259191,0.0064652944,0.081126936,0.000031017207,0.00014166025,0.00039526506,0.00083501794,0.07817713,0.82973605,0.0002867098,0.0025837694,0.00008860223],"about_ca_topic_score_codex":0.0027358346,"about_ca_topic_score_gemma":0.0022318538,"teacher_disagreement_score":0.0042160726,"about_ca_system_score_codex":0.00027993353,"about_ca_system_score_gemma":0.00032798148,"threshold_uncertainty_score":0.0141041875},"labels":[],"label_agreement":null},{"id":"W4416301644","doi":"10.5539/jms.v15n2p148","title":"Analysis of the Applicability of the BIM Methodology to the Management of Municipal Public Infrastructure","year":2025,"lang":"","type":"article","venue":"Journal of Management and Sustainability","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Interoperability; Procurement; Building information modeling; Plan (archaeology); Openness to experience; Modernization theory; Redevelopment; Public infrastructure","score_opus":0.013112434963418818,"score_gpt":0.2735442882714184,"score_spread":0.2604318533079996,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416301644","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6420843,0.08107235,0.10841622,0.00806062,0.00026243442,0.0022153002,0.0024861998,0.0002232657,0.15517932],"genre_scores_gemma":[0.922458,0.024700688,0.049632747,0.00036775073,0.00004185449,0.0009297047,0.0006769024,0.00003625377,0.0011561087],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.97116417,0.019700265,0.0013380396,0.00085886236,0.006252237,0.00068643136],"domain_scores_gemma":[0.9490648,0.037527017,0.0030328922,0.0021106363,0.0080002,0.0002644986],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.033730187,0.00056731625,0.0006155405,0.011797095,0.0008971633,0.0035774151,0.001070801,0.00091911486,0.0016593334],"category_scores_gemma":[0.066299446,0.00037595184,0.0008590929,0.019763036,0.0013061359,0.0023110434,0.002058731,0.00060903816,0.00023342343],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015635502,0.00015712017,0.074281566,0.01489144,0.00064686855,0.0008351067,0.016250836,0.02130111,0.002133205,0.063113794,0.002582253,0.8036503],"study_design_scores_gemma":[0.00009267623,0.0014300245,0.3422421,0.06431886,0.002656199,0.0023180584,0.10189746,0.058340427,0.009572211,0.05602971,0.36083403,0.00026836354],"about_ca_topic_score_codex":0.013209222,"about_ca_topic_score_gemma":0.013709432,"teacher_disagreement_score":0.033730187,"about_ca_system_score_codex":0.0065756026,"about_ca_system_score_gemma":0.01241258,"threshold_uncertainty_score":0.17838442},"labels":[],"label_agreement":null},{"id":"W4416306757","doi":"10.1108/ecam-03-2025-0385","title":"Illustrating the impact of implementing work zones, adjusting work patterns and optimizing crew starting positions to minimize spatial conflicts","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Crew; Work (physics); Workflow; Task (project management); Productivity; Cockpit; Spatial planning; Resource (disambiguation)","score_opus":0.0059245777748070105,"score_gpt":0.21984947652847028,"score_spread":0.21392489875366327,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416306757","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9364445,0.0002940711,0.056569077,0.00017205196,0.000033732158,0.00016510987,0.00014531458,0.00036353618,0.0058126026],"genre_scores_gemma":[0.9718086,0.00007487557,0.027708342,0.000014755576,0.0000022086228,0.000040516952,0.000051795785,0.000011747589,0.00028723112],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991578,0.00036801552,0.00006027286,0.000121499106,0.00014920792,0.00014323604],"domain_scores_gemma":[0.99666876,0.0018842593,0.0005303717,0.0003519622,0.00030972276,0.00025496978],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010294876,0.0010104433,0.00024173126,0.00063393905,0.0004516586,0.0011541201,0.00063517824,0.00047425894,0.001807363],"category_scores_gemma":[0.0051824925,0.00027564497,0.00031891372,0.00057332177,0.00039674045,0.00072581624,0.000856233,0.00035504389,0.00027141973],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012954188,0.0011359544,0.04292379,0.0005813512,0.00010887146,0.00023905752,0.0007127574,0.75153756,0.03793725,0.003698779,0.00073947426,0.15908982],"study_design_scores_gemma":[0.00030299075,0.0063497876,0.04557377,0.00021019526,0.00031481456,0.00030938393,0.0029266921,0.8608466,0.06995289,0.00525703,0.007768912,0.00018697864],"about_ca_topic_score_codex":0.006596474,"about_ca_topic_score_gemma":0.008306326,"teacher_disagreement_score":0.006596474,"about_ca_system_score_codex":0.0007825702,"about_ca_system_score_gemma":0.0015580114,"threshold_uncertainty_score":0.013116181},"labels":[],"label_agreement":null},{"id":"W4416307572","doi":"10.2139/ssrn.5764142","title":"Two-Stage 3D Lift Path Planning Method for Mobile Cranes in Industrial Modular Projects","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Lift (data mining); Modular design; Motion planning; Modular construction; Graph; Path (computing); Web crawler","score_opus":0.022835708477606687,"score_gpt":0.2993323525323262,"score_spread":0.2764966440547195,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416307572","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.010878038,0.000052395,0.98703253,0.000022149457,0.000015154136,0.00005121164,0.0000637107,0.00032093137,0.0015640028],"genre_scores_gemma":[0.3457221,0.00015574665,0.64844435,0.00002743534,0.000013858782,0.00026420405,0.0002690137,0.00017148315,0.0049318597],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974066,0.000038099395,0.00001365068,0.000055604996,0.000119231685,0.000032765427],"domain_scores_gemma":[0.9997892,0.000079027915,0.000016396552,0.000025223237,0.00007453547,0.000015701813],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00028717314,0.0005521596,0.00075735315,0.000649375,0.00044670887,0.00062617566,0.0010193785,0.00070670183,0.0054133222],"category_scores_gemma":[0.00048871024,0.00063496333,0.00085537886,0.0006079444,0.0003392932,0.00049929344,0.0008787451,0.00065890054,0.0007599555],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016306722,0.00007814937,0.0008152474,0.00026969056,0.000043764227,0.0001384072,0.00020660408,0.7291907,0.015958441,0.007649938,0.0016999383,0.24378604],"study_design_scores_gemma":[0.000009941327,0.000032628734,0.00020326381,0.000009104336,0.00000782538,0.0000359918,0.000020158826,0.99568766,0.0017924418,0.0010991624,0.0010929535,0.000008811149],"about_ca_topic_score_codex":0.009650436,"about_ca_topic_score_gemma":0.013483521,"teacher_disagreement_score":0.009650436,"about_ca_system_score_codex":0.00036945418,"about_ca_system_score_gemma":0.0012514241,"threshold_uncertainty_score":0.019188523},"labels":[],"label_agreement":null},{"id":"W4416349058","doi":"10.18280/isi.300924","title":"Recent Innovations, Challenges, and Future Directions in Building Management Systems: A Comprehensive Review","year":2025,"lang":"","type":"article","venue":"Ingénierie des systèmes d information","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Work (physics); Key (lock); Risk management","score_opus":0.015678923306131156,"score_gpt":0.2387277984226386,"score_spread":0.22304887511650745,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416349058","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00032292455,0.998243,0.00027876013,0.0006105445,0.00011585717,0.00000412263,0.000015441496,0.000005362502,0.00040395767],"genre_scores_gemma":[0.0017962982,0.99712026,0.00046381867,0.00028973783,0.00019957707,0.0000057002153,0.000027790504,0.0000018173795,0.000095004965],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99911755,0.00019743979,0.0001518614,0.00014355191,0.00032036062,0.00006918374],"domain_scores_gemma":[0.99456406,0.004090387,0.00045327982,0.00007302941,0.0006842604,0.00013497434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0033337036,0.00076009706,0.001332951,0.002872741,0.00035224363,0.0025148534,0.0011885529,0.001435211,0.0025496315],"category_scores_gemma":[0.0049843434,0.00037225618,0.0007641915,0.004998631,0.00094053376,0.0038209392,0.0012158701,0.0013306,0.00060013443],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000089927205,0.00008281622,0.0008356329,0.04178029,0.00012941331,0.00012649444,0.0002777767,0.00089424645,0.0008738345,0.006940416,0.012701026,0.93526816],"study_design_scores_gemma":[0.00003124912,0.00025459263,0.0034991114,0.027227899,0.0006303397,0.0010600118,0.00093686813,0.00077615306,0.00087302015,0.010086036,0.9545331,0.00009161916],"about_ca_topic_score_codex":0.0015806931,"about_ca_topic_score_gemma":0.002982897,"teacher_disagreement_score":0.0033337036,"about_ca_system_score_codex":0.00084995804,"about_ca_system_score_gemma":0.0034335274,"threshold_uncertainty_score":0.017630517},"labels":[],"label_agreement":null},{"id":"W4416384076","doi":"10.1061/jcemd4.coeng-16673","title":"On- and Off-Site Coordination in a Modular Construction Supply Chain: Domain-Spanning Production Flow Framing and Evaluation","year":2025,"lang":"en","type":"article","venue":"Journal of Construction Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Okanagan University College","funders":"","keywords":"Framing (construction); Modular design; Supply chain; Production (economics); Synchronization (alternating current); Material flow; Frame (networking)","score_opus":0.0034051873053584,"score_gpt":0.1952614508077989,"score_spread":0.19185626350244048,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416384076","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.68723375,0.00016118764,0.2936929,0.00020334484,0.000030019577,0.0010845695,0.00015455724,0.00012733565,0.017312294],"genre_scores_gemma":[0.9100155,0.00008266636,0.08887777,0.000018420695,0.0000049201153,0.0003459836,0.00009966256,0.000014547157,0.000540603],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99456525,0.0034375035,0.00019310233,0.00040598013,0.0011302236,0.00026792302],"domain_scores_gemma":[0.9845339,0.008956592,0.0016196435,0.0010190216,0.003484068,0.000386684],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0149473585,0.0005287651,0.00032151592,0.003559291,0.00087349664,0.0019049675,0.0006483593,0.00054318534,0.0021336826],"category_scores_gemma":[0.024849076,0.00023849281,0.0004354209,0.0020160577,0.0023521371,0.0026366198,0.0021224883,0.00065907266,0.0001224795],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009674569,0.0013948368,0.13360465,0.0011292567,0.00012923485,0.00052299775,0.024227181,0.18004198,0.01752365,0.19736385,0.0017620103,0.4413329],"study_design_scores_gemma":[0.000120380646,0.0020133303,0.09404546,0.0006832273,0.00018371231,0.00023971642,0.030358426,0.7791381,0.025301162,0.057270166,0.010470518,0.00017581484],"about_ca_topic_score_codex":0.003819128,"about_ca_topic_score_gemma":0.0044482993,"teacher_disagreement_score":0.0149473585,"about_ca_system_score_codex":0.003348765,"about_ca_system_score_gemma":0.0026314526,"threshold_uncertainty_score":0.07905012},"labels":[],"label_agreement":null},{"id":"W4416532987","doi":"10.1007/978-3-032-01078-0_26","title":"ModularBuildingPy: A Python-Based Numerical Modeling and Analysis Tool for Volumetric Modular Steel Buildings","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Modular design; Serviceability (structure); Numerical models; Numerical modeling; Automation; Base (topology); Computer simulation; Design tool","score_opus":0.006309722887478918,"score_gpt":0.19652546128392206,"score_spread":0.19021573839644315,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416532987","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004302999,0.0001712704,0.8480175,0.00014561795,0.00017079493,0.00015252044,0.005558046,0.12288832,0.018592982],"genre_scores_gemma":[0.11120893,0.00090918894,0.7260279,0.0006096152,0.0001235664,0.0012113325,0.02183961,0.09815527,0.039914627],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99946314,0.000050998915,0.00003507963,0.00006340449,0.00030432676,0.00008315683],"domain_scores_gemma":[0.9994797,0.00020173796,0.000035172536,0.000082698396,0.00014898679,0.000051759187],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057836977,0.0016291669,0.0009907382,0.00082134595,0.0006351434,0.0015554775,0.004235419,0.0009447576,0.058231235],"category_scores_gemma":[0.0017188846,0.0011800067,0.0015845259,0.0010636816,0.000600363,0.001964612,0.0023015137,0.0024549842,0.021033188],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00029515324,0.00033798267,0.0023229232,0.001689173,0.0002093349,0.0006448258,0.000748086,0.2206752,0.025504462,0.07935909,0.38245374,0.2857601],"study_design_scores_gemma":[0.00018468154,0.000048371247,0.0010536248,0.00019947214,0.000054731154,0.00037792377,0.00008861852,0.66737247,0.020794535,0.040537197,0.26917347,0.000114928],"about_ca_topic_score_codex":0.003418491,"about_ca_topic_score_gemma":0.0052073966,"teacher_disagreement_score":0.058231235,"about_ca_system_score_codex":0.00053690345,"about_ca_system_score_gemma":0.0014190476,"threshold_uncertainty_score":0.19480288},"labels":[],"label_agreement":null},{"id":"W4416532992","doi":"10.1007/978-3-032-01078-0","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 14","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.0045960466164519185,"score_gpt":0.17565600811361562,"score_spread":0.1710599614971637,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416532992","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031160552,0.016709298,0.003432093,0.025925104,0.05444162,0.00018379895,0.0064164526,0.0008536489,0.88892186],"genre_scores_gemma":[0.0029293199,0.003939478,0.0008023635,0.0004860442,0.0006550399,0.000022976987,0.0018557835,0.00017337597,0.9891356],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983529,0.000082962964,0.000027455406,0.00008638869,0.0012250973,0.00022521538],"domain_scores_gemma":[0.9978181,0.00006971473,0.000022401488,0.00005552687,0.001606829,0.0004273976],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0016017029,0.0012717539,0.0009745739,0.002145641,0.0028759898,0.0056535196,0.0014713472,0.0018839156,0.3100956],"category_scores_gemma":[0.0017182325,0.00050754996,0.00054001523,0.0025944456,0.0011529607,0.0015333315,0.0020179832,0.001867214,0.105625995],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017844499,0.000019532295,0.0001188824,0.00004496442,0.0000027168032,0.000015188154,0.00002409983,0.000096621865,0.0001959849,0.0013606669,0.97094,0.027163472],"study_design_scores_gemma":[0.0000034444342,0.0000050982344,0.00058595685,0.000037330494,0.0000037353268,0.00001124521,0.00008965785,0.00013971401,0.00014822806,0.00050952676,0.9984598,0.0000061988644],"about_ca_topic_score_codex":0.50057036,"about_ca_topic_score_gemma":0.7590601,"teacher_disagreement_score":0.9907666,"about_ca_system_score_codex":0.009233414,"about_ca_system_score_gemma":0.029744683,"threshold_uncertainty_score":0.9953134},"labels":[],"label_agreement":null},{"id":"W4416534340","doi":"10.1007/978-3-031-95107-7","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 9","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.0046220281266953515,"score_gpt":0.17576286900746677,"score_spread":0.17114084088077142,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416534340","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031439345,0.016266268,0.003128239,0.025747264,0.0622936,0.00019130539,0.005327097,0.00080641184,0.8830958],"genre_scores_gemma":[0.0030739636,0.0040216004,0.00077407446,0.0005463029,0.00082626427,0.000024156456,0.0017082902,0.00016305118,0.98886234],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9983858,0.000083017134,0.00002734872,0.00008427799,0.0011922747,0.00022725263],"domain_scores_gemma":[0.9977501,0.00006828765,0.000022349517,0.000054118467,0.0016252908,0.00047974277],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015412179,0.0012183342,0.00088597916,0.002081241,0.0027724325,0.005535787,0.0014356723,0.0019270619,0.32060364],"category_scores_gemma":[0.0016302583,0.0004656776,0.0005480917,0.0023422097,0.0010919846,0.0014357918,0.001992815,0.0018515202,0.11696522],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018494045,0.000020312897,0.00011850041,0.000047048135,0.0000027768606,0.000018405364,0.000023551756,0.00008734681,0.00023820279,0.0012051716,0.971545,0.026675347],"study_design_scores_gemma":[0.0000035549185,0.0000053467024,0.0006064145,0.000038422717,0.0000035892228,0.000012848966,0.000085954,0.00012261044,0.00014156669,0.00041446605,0.99855906,0.0000062753343],"about_ca_topic_score_codex":0.44325188,"about_ca_topic_score_gemma":0.7173306,"teacher_disagreement_score":0.44325188,"about_ca_system_score_codex":0.00817269,"about_ca_system_score_gemma":0.02620646,"threshold_uncertainty_score":0.96907645},"labels":[],"label_agreement":null},{"id":"W4416570692","doi":"10.1007/978-3-031-95421-4_7","title":"Computer Vision-Based Work Productivity Optimization with Lean Principles and Simulation Method","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Workflow; Lean manufacturing; Productivity; Automation; Work (physics); Lean project management; Lean laboratory; Production (economics)","score_opus":0.007275662048574258,"score_gpt":0.2115994374729269,"score_spread":0.20432377542435265,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416570692","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011511674,0.00013408712,0.9849989,0.000034473054,0.000023895464,0.0000359119,0.000028931412,0.00045728454,0.002774881],"genre_scores_gemma":[0.6126401,0.0002504988,0.3820391,0.000060369253,0.000031904423,0.00022869388,0.0002232669,0.00020837098,0.004317743],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99960047,0.00007283609,0.000019362174,0.00010073135,0.00014613365,0.000060527604],"domain_scores_gemma":[0.9995214,0.00021834881,0.000043801978,0.000032422045,0.0001616952,0.000022328975],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.000714562,0.0008064094,0.0011745548,0.0012154533,0.00039101797,0.0010519526,0.0010830971,0.0008259164,0.002274194],"category_scores_gemma":[0.00098706,0.00054850744,0.0009639568,0.0016347474,0.00040231473,0.0007742229,0.0006625013,0.00062025647,0.0004321243],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006471379,0.00011842553,0.00029035032,0.000048509177,0.000028789618,0.000021001919,0.000021840957,0.8894882,0.0039076367,0.0023138318,0.00064738264,0.103049226],"study_design_scores_gemma":[0.0000017685217,0.0000069011076,0.000045463337,0.000001443494,0.0000023936404,0.0000028251652,0.0000017034815,0.99918073,0.00041717815,0.00024470765,0.00009321322,0.000001711304],"about_ca_topic_score_codex":0.009187944,"about_ca_topic_score_gemma":0.0057303607,"teacher_disagreement_score":0.009187944,"about_ca_system_score_codex":0.0010163418,"about_ca_system_score_gemma":0.0011370091,"threshold_uncertainty_score":0.018268943},"labels":[],"label_agreement":null},{"id":"W4416570694","doi":"10.1007/978-3-031-95421-4","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 8","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004617902705697701,"score_gpt":0.1757244290953608,"score_spread":0.1711065263896631,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416570694","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0031746298,0.017146962,0.0032250518,0.026463734,0.060985804,0.00018933264,0.005603167,0.0007991788,0.88241214],"genre_scores_gemma":[0.0030048336,0.0040024356,0.00076762115,0.00052860513,0.0007709843,0.00002407478,0.0017498581,0.00015960615,0.9889921],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99843496,0.00008037766,0.00002647088,0.00008190436,0.0011581123,0.00021828794],"domain_scores_gemma":[0.997806,0.0000676544,0.000022065595,0.000053214328,0.001603597,0.00044729174],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015436332,0.00124205,0.0008847496,0.0020504645,0.0026634054,0.005306416,0.0013928475,0.0019196157,0.31784123],"category_scores_gemma":[0.0016323164,0.00046686362,0.0005250758,0.002330741,0.0010475162,0.0014618698,0.001937268,0.0018730252,0.113609955],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00001866274,0.000020285723,0.00011924025,0.00004794339,0.000002686823,0.000017248201,0.000024397763,0.00009043403,0.00023265473,0.0011989415,0.9704221,0.027805328],"study_design_scores_gemma":[0.0000035423811,0.0000053217323,0.0006142102,0.000039765346,0.000003702272,0.000012507006,0.00008846128,0.00012481192,0.00014089316,0.00043079464,0.9985299,0.0000061703854],"about_ca_topic_score_codex":0.43710333,"about_ca_topic_score_gemma":0.7165851,"teacher_disagreement_score":0.56289667,"about_ca_system_score_codex":0.007815201,"about_ca_system_score_gemma":0.025344452,"threshold_uncertainty_score":0.9730167},"labels":[],"label_agreement":null},{"id":"W4416570770","doi":"10.1007/978-3-031-95421-4_20","title":"Experimental Investigation of Durable Wood Panels for the Design of Relocatable Modular Buildings","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Waterloo","funders":"","keywords":"Modular design; Reuse; Durability; Component (thermodynamics); Connection (principal bundle); Construction industry; Modular construction","score_opus":0.013193944162442269,"score_gpt":0.1977172981584547,"score_spread":0.18452335399601244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416570770","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9913413,0.00006954843,0.0064451685,0.000007727714,0.000013439573,0.000027816997,0.00009179421,0.000036166068,0.0019671086],"genre_scores_gemma":[0.9946307,0.000048046022,0.0040820255,0.000003262932,0.000001524314,0.000015827434,0.00005689545,0.00001558574,0.0011461164],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998123,0.000043344102,0.000005354158,0.000030305873,0.00007301574,0.000035681576],"domain_scores_gemma":[0.99959594,0.00015759899,0.000043970238,0.000101767146,0.000059634647,0.000041127052],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0002659809,0.0003878821,0.00022113115,0.0002749932,0.00020016704,0.00026003493,0.0006928969,0.00038686657,0.0043853335],"category_scores_gemma":[0.0006864896,0.00021423616,0.00021744653,0.00024461455,0.00027775596,0.0002704802,0.00027987483,0.00031597176,0.00029532914],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006517771,0.0010798789,0.0014448197,0.00020320588,0.000019948933,0.00021701239,0.00020386468,0.052022193,0.92931676,0.0011290631,0.000254002,0.013457482],"study_design_scores_gemma":[0.00018635707,0.009726419,0.015631907,0.00003507903,0.000068526606,0.0002416147,0.00046892738,0.14105235,0.82836753,0.0005671706,0.0036231116,0.000030977157],"about_ca_topic_score_codex":0.00053489115,"about_ca_topic_score_gemma":0.0012407245,"teacher_disagreement_score":0.0043853335,"about_ca_system_score_codex":0.00015083756,"about_ca_system_score_gemma":0.00016369118,"threshold_uncertainty_score":0.014670372},"labels":[],"label_agreement":null},{"id":"W4416737649","doi":"10.3846/jcem.2025.25213","title":"Identifying cyber risk factors associated with construction projects","year":2025,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Tamkeen; York University; New York University Abu Dhabi","keywords":"Risk management; Checklist; Risk assessment; Set (abstract data type); Risk management framework; Risk management plan; IT risk management; Expert elicitation","score_opus":0.007629885064501771,"score_gpt":0.19245803612367987,"score_spread":0.1848281510591781,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416737649","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9698187,0.00089509104,0.019654144,0.00040734935,0.000015305777,0.0004050854,0.00037750855,0.0000451511,0.008381685],"genre_scores_gemma":[0.9906777,0.0004440209,0.00817902,0.000014298751,0.00000813497,0.00013760834,0.00018696446,0.000008472805,0.00034381438],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9893204,0.0034145447,0.0017226085,0.00059597107,0.0043286034,0.0006178907],"domain_scores_gemma":[0.9320693,0.030449804,0.024075242,0.0021673397,0.009708619,0.0015296476],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00740796,0.0009697616,0.0005215878,0.010423221,0.0010959092,0.002961032,0.00056799094,0.0007478505,0.0019157731],"category_scores_gemma":[0.0427043,0.00043496664,0.00081947865,0.006530201,0.001387974,0.0024670733,0.003958845,0.00092505955,0.0001922297],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013361992,0.00014548357,0.87650824,0.0007941335,0.00016519979,0.0004802209,0.009535307,0.00484193,0.0011181587,0.0035472508,0.0005395704,0.102190875],"study_design_scores_gemma":[0.00000793543,0.00029706545,0.95744824,0.0008853778,0.0002076289,0.0008489006,0.021074418,0.008738336,0.0015934939,0.0042889104,0.004493295,0.00011630532],"about_ca_topic_score_codex":0.0030278938,"about_ca_topic_score_gemma":0.00488849,"teacher_disagreement_score":0.010423221,"about_ca_system_score_codex":0.0021314665,"about_ca_system_score_gemma":0.0037700478,"threshold_uncertainty_score":0.039177537},"labels":[],"label_agreement":null},{"id":"W4416771876","doi":"10.3390/buildings15234242","title":"A GPS-Integrated IoT Framework for Real-Time Monitoring of Prefabricated Building Modules During Transportation","year":2025,"lang":"en","type":"article","venue":"Buildings","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada; University of New Brunswick","funders":"","keywords":"Modular design; Global Positioning System; Geospatial analysis; Cloud computing; Visibility; Field (mathematics); Data acquisition; TRACE (psycholinguistics); Acceleration","score_opus":0.006885914224565573,"score_gpt":0.2359288477507889,"score_spread":0.22904293352622332,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416771876","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016080385,0.00022859249,0.97477853,0.00009551116,0.000050471484,0.00011642205,0.0004031003,0.004957973,0.003288947],"genre_scores_gemma":[0.682327,0.00047049535,0.3120206,0.00013654171,0.00006116466,0.00032375197,0.0015885959,0.00034542702,0.0027265067],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99965155,0.00004375541,0.000024597915,0.00008497891,0.00014287766,0.000052292664],"domain_scores_gemma":[0.99981695,0.00003000649,0.000025978483,0.000042646763,0.000052135234,0.00003236156],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00041529065,0.0007063373,0.00045706358,0.00064104574,0.00030314244,0.0009304996,0.0012014861,0.00050498126,0.0010020364],"category_scores_gemma":[0.0005731895,0.000277532,0.00052779296,0.00044933215,0.00041585517,0.00094832486,0.0014857288,0.0005452673,0.00050257525],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005017517,0.0003467909,0.019447867,0.000719288,0.0002464143,0.00249054,0.0013589318,0.42953813,0.10260604,0.0991743,0.018138632,0.32543138],"study_design_scores_gemma":[0.000029667259,0.000121005294,0.0056878086,0.000063446605,0.00007300988,0.00046479044,0.0002765579,0.9291064,0.014416673,0.019011993,0.03068789,0.00006087495],"about_ca_topic_score_codex":0.0038162232,"about_ca_topic_score_gemma":0.0057045575,"teacher_disagreement_score":0.0038162232,"about_ca_system_score_codex":0.000356299,"about_ca_system_score_gemma":0.0005753606,"threshold_uncertainty_score":0.007588029},"labels":[],"label_agreement":null},{"id":"W4416947709","doi":"10.1108/ecam-04-2025-0645","title":"Scan-to-BIM approach for enhanced semi-automated cost management in modular off-site construction","year":2025,"lang":"en","type":"article","venue":"Engineering Construction & Architectural Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta; École de Technologie Supérieure; National Research Council Canada","funders":"Mitacs","keywords":"Modular design; Cost estimate; Prefabrication; Cost efficiency; Cost driver; Modular programming; Cost accounting; Cost reduction; Lean manufacturing","score_opus":0.0038265241752745375,"score_gpt":0.20396387286185955,"score_spread":0.200137348686585,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4416947709","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04017964,0.00021920326,0.93778515,0.00040637702,0.000044741326,0.00041618184,0.00065346685,0.0020474154,0.018247845],"genre_scores_gemma":[0.2821072,0.00029447066,0.71298486,0.00010042793,0.0000145660615,0.000382216,0.000799631,0.00030982104,0.003006832],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9958404,0.0011470651,0.00019130482,0.00037976846,0.0022144348,0.00022700077],"domain_scores_gemma":[0.9963393,0.001039168,0.0005163857,0.0006859082,0.001296287,0.00012294466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003071314,0.0011643543,0.00065678207,0.0044394517,0.00086286024,0.0033492167,0.0019003609,0.00068166695,0.006312947],"category_scores_gemma":[0.006262524,0.00074097817,0.0012080725,0.0032507079,0.000979878,0.0027793464,0.0036743293,0.0009797848,0.0013231505],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002475317,0.00036152854,0.015676348,0.00081960176,0.00015058438,0.00043402583,0.0023767664,0.22804359,0.013732081,0.061089363,0.0076960432,0.66937256],"study_design_scores_gemma":[0.000056510307,0.0003147646,0.016517652,0.00038613053,0.00016088129,0.000566472,0.0036298977,0.8421796,0.021757498,0.0506874,0.063544855,0.00019832415],"about_ca_topic_score_codex":0.014860891,"about_ca_topic_score_gemma":0.03154085,"teacher_disagreement_score":0.014860891,"about_ca_system_score_codex":0.0027212494,"about_ca_system_score_gemma":0.0051984917,"threshold_uncertainty_score":0.029548824},"labels":[],"label_agreement":null},{"id":"W4417150931","doi":"10.3846/jcem.2025.24043","title":"Autonomous modular construction strategy using robotized crane based on deep learning and reinforcement learning","year":2025,"lang":"en","type":"article","venue":"Journal of Civil Engineering and Management","topic":"BIM and Construction Integration","field":"Engineering","cited_by":2,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Modular design; Reinforcement learning; Container (type theory); Kinematics; Robot; Motion planning; Field (mathematics); Modular construction","score_opus":0.004542816664117812,"score_gpt":0.19533897637398742,"score_spread":0.1907961597098696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417150931","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0603876,0.00013734288,0.9345336,0.0000766511,0.000033039683,0.000053492266,0.000024300096,0.00086341694,0.003890673],"genre_scores_gemma":[0.9093931,0.00007670998,0.08791252,0.000041755604,0.000008017496,0.000087226734,0.000056930603,0.00003155192,0.0023922827],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998456,0.000019668343,0.0000066526836,0.00004609975,0.000048448557,0.000033552195],"domain_scores_gemma":[0.99976903,0.000065570064,0.00004447228,0.000028358541,0.000062615865,0.00003006245],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00030386116,0.0006426714,0.0005775041,0.00029898089,0.00030726317,0.0003928199,0.0008889379,0.0005148452,0.0017922429],"category_scores_gemma":[0.00048256494,0.00032948956,0.000454607,0.00020799888,0.0005622282,0.00047844223,0.00084636686,0.0005769108,0.00024303093],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006870555,0.00006004424,0.001165257,0.000050436043,0.000030297537,0.00009621488,0.000046027635,0.9194295,0.00882762,0.0030390776,0.0005342544,0.06665253],"study_design_scores_gemma":[0.0000055075907,0.000044605422,0.00014885927,0.0000026997661,0.000005274369,0.000012530479,0.000004536832,0.9978598,0.0011085743,0.0005444885,0.00025919263,0.0000039975025],"about_ca_topic_score_codex":0.007353821,"about_ca_topic_score_gemma":0.0075995303,"teacher_disagreement_score":0.007353821,"about_ca_system_score_codex":0.0005715335,"about_ca_system_score_gemma":0.0011732755,"threshold_uncertainty_score":0.014622033},"labels":[],"label_agreement":null},{"id":"W4417229627","doi":"10.1061/9780784486139.014","title":"Developing Virtual Reality Workflow for Panelized Construction Assembly Training","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of British Columbia","funders":"","keywords":"Prefabrication; Workflow; Virtual reality; Training (meteorology); Focus (optics); Commodity","score_opus":0.04459212585407773,"score_gpt":0.28476699177313747,"score_spread":0.24017486591905973,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417229627","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.026817115,0.00026094483,0.9339285,0.00031122306,0.0001402118,0.0012053464,0.0009963136,0.014227892,0.022112489],"genre_scores_gemma":[0.19854172,0.00056277175,0.78132796,0.00012740449,0.00003354983,0.0012546116,0.0019708667,0.0013516682,0.014829458],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99903274,0.00025145055,0.00009633263,0.00018567947,0.00028843965,0.0001453118],"domain_scores_gemma":[0.99898666,0.0003233594,0.00006929815,0.00027151487,0.0001862192,0.00016283103],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012081912,0.001024775,0.00047364255,0.0010585125,0.0005843987,0.0019712106,0.0015652329,0.0010572406,0.019817358],"category_scores_gemma":[0.002711249,0.00063134695,0.0012902521,0.0004595152,0.00035342074,0.001089043,0.0020547241,0.0009965374,0.006436892],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000870296,0.0011940419,0.0032331038,0.0016951087,0.00006725584,0.002323543,0.0056756376,0.06785209,0.083428845,0.022488529,0.027192108,0.7839794],"study_design_scores_gemma":[0.00040014205,0.0010467398,0.012440405,0.0010575972,0.00014716711,0.0030723363,0.003259579,0.36232463,0.1075468,0.01882721,0.4893453,0.0005320685],"about_ca_topic_score_codex":0.0019054617,"about_ca_topic_score_gemma":0.0021705301,"teacher_disagreement_score":0.019817358,"about_ca_system_score_codex":0.00046222386,"about_ca_system_score_gemma":0.0016098522,"threshold_uncertainty_score":0.066295624},"labels":[],"label_agreement":null},{"id":"W4417229862","doi":"10.1061/9780784486122.022","title":"Comparison of Two Simulation Platforms Based on Learning and Application Experiences of a Civil Engineering Trainee: SDESA versus SIMPHONY","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Process (computing); Discrete event simulation; Simulation modeling; Software; Simulation software; Event (particle physics); Learning curve","score_opus":0.01295091408086762,"score_gpt":0.29100111332083095,"score_spread":0.2780501992399633,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417229862","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.96345973,0.00010036526,0.025053935,0.00012794233,0.000040295712,0.00049637567,0.00016677422,0.00031797696,0.010236553],"genre_scores_gemma":[0.97325176,0.00015911376,0.024555044,0.000030699342,0.000007613948,0.0005310498,0.000290163,0.000044349363,0.0011301766],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9986547,0.0006336745,0.000100358666,0.00012963235,0.0003292536,0.00015229914],"domain_scores_gemma":[0.99547464,0.0024677336,0.00031117315,0.00048081132,0.00064180384,0.00062392466],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002135904,0.000563857,0.00065601605,0.0011713554,0.00036550115,0.0011672849,0.0010348309,0.0006656557,0.0035457402],"category_scores_gemma":[0.008570538,0.00033315615,0.0005268049,0.00070747343,0.000602765,0.0016180944,0.0017291543,0.00067827647,0.0005548087],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.018890014,0.00940044,0.051132232,0.0015869727,0.00031459224,0.00057895103,0.005975571,0.38851878,0.053181116,0.023759115,0.0030855178,0.44357666],"study_design_scores_gemma":[0.0017531405,0.018988306,0.08248311,0.00037845722,0.00029477384,0.00034633387,0.006749651,0.82700634,0.036560625,0.007332031,0.017806025,0.00030123512],"about_ca_topic_score_codex":0.0022182558,"about_ca_topic_score_gemma":0.0025266116,"teacher_disagreement_score":0.0035457402,"about_ca_system_score_codex":0.001107749,"about_ca_system_score_gemma":0.0012840702,"threshold_uncertainty_score":0.011861682},"labels":[],"label_agreement":null},{"id":"W4417318362","doi":"10.69709/susproc.2025.155435","title":"Data Delivery for Standardizing Sustainable Whole-Building Lifecycle Assessment Using the Proposed OpenBIM Framework","year":2025,"lang":"en","type":"article","venue":"Sustainable Processes Connect","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure; National Research Council Canada","funders":"National Research Council Canada","keywords":"Standardization; Consistency (knowledge bases); Reliability (semiconductor); Redundancy (engineering); Key (lock); Data modeling; Baseline (sea); Data exchange","score_opus":0.019920491559240385,"score_gpt":0.3114628977154385,"score_spread":0.29154240615619814,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W4417318362","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029849529,0.00015865131,0.9858555,0.00065521855,0.00007887015,0.00041474798,0.00081802136,0.0029433086,0.0060906475],"genre_scores_gemma":[0.046739228,0.00031734107,0.94451916,0.00028601295,0.00005743748,0.0009258176,0.004559251,0.0005184147,0.0020774405],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.983164,0.004598961,0.0023886373,0.0018458362,0.0071246307,0.0008780561],"domain_scores_gemma":[0.984218,0.0020599973,0.0012000775,0.0068530105,0.00504118,0.00062769884],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.024022296,0.0010244396,0.0011802881,0.006064304,0.001697437,0.00816506,0.0062324875,0.002349718,0.0028645452],"category_scores_gemma":[0.024157679,0.000983092,0.0022488793,0.0051065874,0.001954901,0.00821372,0.012886503,0.002925299,0.002372801],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001582324,0.00052188686,0.007186561,0.00074764405,0.00017358453,0.0005340516,0.0017317389,0.0700087,0.007979662,0.5699057,0.019669395,0.32138276],"study_design_scores_gemma":[0.00010819444,0.00019505677,0.0035726903,0.0011325468,0.00012535808,0.00068827387,0.001116471,0.30107707,0.016660754,0.23228754,0.44276735,0.0002687022],"about_ca_topic_score_codex":0.010032691,"about_ca_topic_score_gemma":0.008883299,"teacher_disagreement_score":0.024022296,"about_ca_system_score_codex":0.0033750208,"about_ca_system_score_gemma":0.00739216,"threshold_uncertainty_score":0.12704355},"labels":[],"label_agreement":null},{"id":"W52441173","doi":"10.22260/isarc2014/0036","title":"Post-Simulation Visualization Application for Production Improvement of Modular Construction Manufacturing","year":2014,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Modular design; Visualization; Computer science; Context (archaeology); Process (computing); Lean manufacturing; Discrete event simulation; Production (economics); Material flow; Production planning; Industrial engineering; Manufacturing engineering; Simulation; Engineering; Data mining","score_opus":0.005289366042261784,"score_gpt":0.21063486904507633,"score_spread":0.20534550300281454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W52441173","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06900119,0.0006130299,0.7725915,0.0005555805,0.00024409339,0.000670976,0.0033729877,0.12844488,0.024505831],"genre_scores_gemma":[0.5335523,0.0010937151,0.4358071,0.000226389,0.00008322487,0.0010412553,0.0040428042,0.007029804,0.017123446],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999619,0.00009662358,0.000034380777,0.00004739505,0.00015739085,0.000045152276],"domain_scores_gemma":[0.99881244,0.00064451,0.00007457693,0.00012880946,0.00026912434,0.00007061623],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010791734,0.0013175957,0.00065792195,0.0018012304,0.0003632585,0.001248343,0.0012394357,0.0010887966,0.03212522],"category_scores_gemma":[0.0021106978,0.0005385076,0.0011239354,0.0007469086,0.00020158033,0.00080183975,0.0012237803,0.00088617083,0.0026286806],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0018227538,0.0010638866,0.007715938,0.0027380656,0.00023669295,0.0025773237,0.0033736613,0.35133815,0.078704394,0.01012293,0.05773076,0.48257545],"study_design_scores_gemma":[0.00019574194,0.00032093946,0.0044076187,0.00027944852,0.000102324586,0.00044421962,0.0003091264,0.89600295,0.038361322,0.0044841007,0.05496271,0.00012952246],"about_ca_topic_score_codex":0.0016327469,"about_ca_topic_score_gemma":0.0017650375,"teacher_disagreement_score":0.03212522,"about_ca_system_score_codex":0.00035627588,"about_ca_system_score_gemma":0.00058656855,"threshold_uncertainty_score":0.1074695},"labels":[],"label_agreement":null},{"id":"W52574272","doi":"10.22260/isarc2013/0091","title":"Automated Development of Construction Schedules Using Onsite Data Acquisition","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science; Download; Schedule; Documentation; SQL; Database; Benchmarking; Software; Server; Scheduling (production processes); Software engineering; Operating system","score_opus":0.022671815935721353,"score_gpt":0.22956041958331563,"score_spread":0.2068886036475943,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W52574272","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08185082,0.00016213073,0.84843206,0.00022660565,0.00007692837,0.00078861613,0.003996219,0.048555244,0.015911438],"genre_scores_gemma":[0.50033426,0.0002316807,0.48185936,0.000064702625,0.00004116186,0.0005363143,0.007853067,0.0014289214,0.0076505477],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9989524,0.00021137514,0.000061001974,0.0002070574,0.00047995342,0.00008825337],"domain_scores_gemma":[0.9971723,0.00082480063,0.00032148184,0.00063120475,0.0008565208,0.00019376495],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010712649,0.0009638696,0.000731087,0.0021252665,0.00047112876,0.0015075948,0.0012500421,0.00030057307,0.00850769],"category_scores_gemma":[0.003267069,0.00047274586,0.00047320072,0.0013935892,0.0002458233,0.0007005822,0.0011900103,0.00050585496,0.0027698642],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00051615067,0.0003799124,0.01223106,0.00033161652,0.00008676855,0.00031902565,0.00101309,0.14264336,0.019140625,0.004989589,0.028013507,0.79033524],"study_design_scores_gemma":[0.00008529871,0.000139137,0.011146406,0.00007939711,0.000038046717,0.000108593806,0.0006976556,0.92662793,0.019453457,0.0035572986,0.037993874,0.00007292841],"about_ca_topic_score_codex":0.023795398,"about_ca_topic_score_gemma":0.024330981,"teacher_disagreement_score":0.023795398,"about_ca_system_score_codex":0.0009939157,"about_ca_system_score_gemma":0.002159782,"threshold_uncertainty_score":0.04731381},"labels":[],"label_agreement":null},{"id":"W569224618","doi":"","title":"Construction Research Congress 2010 : innovation for reshaping construction practice : proceedings of the 2010 Construction Research Congress, May 8-10, 2010, Banff, Alberta, Canada","year":2010,"lang":"en","type":"book","venue":"American Society of Civil Engineers eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":4,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Library science; Political science; Engineering; Public administration; Computer science","score_opus":0.0265850573071109,"score_gpt":0.278180885158776,"score_spread":0.25159582785166507,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W569224618","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0067806686,0.13982198,0.0052139913,0.08106791,0.044775683,0.0004686266,0.0057612876,0.0010861973,0.7150237],"genre_scores_gemma":[0.008673726,0.03463784,0.0019031998,0.001336673,0.0012091171,0.00013362199,0.0029550872,0.00019476697,0.94895613],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99764246,0.000173425,0.000070157694,0.00016427238,0.0016450897,0.0003045309],"domain_scores_gemma":[0.9974226,0.00024567297,0.000082367944,0.00010268429,0.0015846076,0.000562114],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054665105,0.001415719,0.001016904,0.0022105502,0.004031909,0.009309186,0.001727679,0.0034126963,0.06313765],"category_scores_gemma":[0.0027109382,0.00072541693,0.00057009014,0.0043551167,0.002050314,0.002958536,0.0026970047,0.0037603516,0.016373808],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018446653,0.00002298317,0.000106963606,0.00008795012,0.0000024075462,0.000011567679,0.00016087026,0.00014722736,0.00014383248,0.0040871613,0.9593526,0.03585795],"study_design_scores_gemma":[0.0000050759177,0.0000085767,0.0013326029,0.00011331878,0.0000044601456,0.000014312117,0.00038502086,0.00006474925,0.00017262153,0.0005036047,0.9973853,0.000010376639],"about_ca_topic_score_codex":0.39341858,"about_ca_topic_score_gemma":0.7917248,"teacher_disagreement_score":0.60658145,"about_ca_system_score_codex":0.019612858,"about_ca_system_score_gemma":0.048472464,"threshold_uncertainty_score":0.78225726},"labels":[],"label_agreement":null},{"id":"W573351360","doi":"","title":"Project Management Software","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Software project management; Computer science; Project management; Software; Project management triangle; Software engineering; Software development; Engineering management; Software construction; Process management; Systems engineering; Engineering; Operating system","score_opus":0.012064288958577897,"score_gpt":0.2496268575771849,"score_spread":0.237562568618607,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W573351360","genre_codex":"methods","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0041449615,0.0005879579,0.5862696,0.0010161764,0.00054396386,0.0013227047,0.0180632,0.22350185,0.16454956],"genre_scores_gemma":[0.05447965,0.0017482212,0.58620244,0.0012017273,0.00040963662,0.0051860358,0.07957839,0.07265942,0.19853449],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99643075,0.00054854923,0.0005783534,0.00045141802,0.0017369037,0.00025401032],"domain_scores_gemma":[0.9883307,0.003584812,0.0007048822,0.0031686414,0.0035384079,0.00067248277],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0057770577,0.0011913826,0.00088005385,0.005161599,0.00089740864,0.00444009,0.002730219,0.0012176753,0.15393132],"category_scores_gemma":[0.017452547,0.0014005384,0.0009866129,0.0052621826,0.0004895278,0.005038264,0.0039240406,0.0018613338,0.09552792],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00022647588,0.00020407025,0.0014307855,0.0005382853,0.00005810823,0.0001688256,0.0006715006,0.0033761822,0.0021796178,0.026455287,0.4353579,0.52933294],"study_design_scores_gemma":[0.00016384874,0.000068694266,0.0021419383,0.00024627027,0.000043761323,0.00034969664,0.00014027387,0.010593721,0.0028614765,0.028478699,0.95482224,0.000089382986],"about_ca_topic_score_codex":0.0021215926,"about_ca_topic_score_gemma":0.0016214696,"teacher_disagreement_score":0.15393132,"about_ca_system_score_codex":0.0011049502,"about_ca_system_score_gemma":0.0022342296,"threshold_uncertainty_score":0.5149516},"labels":[],"label_agreement":null},{"id":"W575637696","doi":"","title":"Streamlining the Bridge Design Process","year":2006,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Deliverable; Computer science; Process (computing); Software engineering; Automation; Software; Engineering design process; Quality (philosophy); Engineering drawing; Systems engineering; Engineering; Programming language","score_opus":0.0173698152252084,"score_gpt":0.25382050756088703,"score_spread":0.23645069233567864,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W575637696","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06031148,0.0013928657,0.89516175,0.00783108,0.0008152354,0.0012376667,0.00014201336,0.0050857165,0.028022148],"genre_scores_gemma":[0.10278304,0.0015404904,0.87823623,0.0013370618,0.00033214336,0.00050308846,0.0003365363,0.0009974794,0.013933978],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.98104054,0.009123427,0.0012403221,0.0021286448,0.005911636,0.000555359],"domain_scores_gemma":[0.93823165,0.03172187,0.0032587396,0.010728039,0.014787823,0.0012719313],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.02280117,0.0012673627,0.0007180897,0.0034030639,0.0019953705,0.006552664,0.002086689,0.0020593286,0.0063922442],"category_scores_gemma":[0.05405956,0.0010635883,0.00067902054,0.0024017047,0.0019329314,0.0064639705,0.0042290525,0.004316995,0.0045047626],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009976158,0.00030275414,0.0023677605,0.0005576395,0.00002188282,0.00020362738,0.0064925323,0.010378055,0.012091067,0.025317218,0.016342683,0.925825],"study_design_scores_gemma":[0.00019181684,0.0005226623,0.0061288676,0.0010797876,0.00012377682,0.0009469892,0.0072993236,0.08463043,0.025809322,0.10561745,0.76746833,0.00018124293],"about_ca_topic_score_codex":0.0041968976,"about_ca_topic_score_gemma":0.007164969,"teacher_disagreement_score":0.02280117,"about_ca_system_score_codex":0.0034165517,"about_ca_system_score_gemma":0.009654087,"threshold_uncertainty_score":0.12058556},"labels":[],"label_agreement":null},{"id":"W575840679","doi":"","title":"The proceedings of the 2000 Summer Computer Simulation Conference , Vancouver, British Columbia, Canada, July 16-20, 2000, the Coast Plaza Suite Hotel","year":2000,"lang":"en","type":"book","venue":"Society for Computer Simulation International eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Suite; Geography; Meteorology; Archaeology; Library science; History; Computer science","score_opus":0.008589957457182011,"score_gpt":0.19486939186072744,"score_spread":0.1862794344035454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W575840679","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.016335677,0.012437997,0.059448946,0.004687448,0.010146787,0.00030171947,0.0055698277,0.006074472,0.8849971],"genre_scores_gemma":[0.008177582,0.00504926,0.003360802,0.00015847267,0.0001227889,0.00004928901,0.0027201711,0.0005716404,0.97979],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968743,0.000041277744,0.00001261579,0.000037574246,0.0001843336,0.00003679745],"domain_scores_gemma":[0.9992187,0.00012102842,0.000010611757,0.000048108184,0.00043435502,0.00016729356],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007894608,0.0018559139,0.0011832217,0.0007506938,0.0014326785,0.0039746175,0.0010711174,0.0010155491,0.16988781],"category_scores_gemma":[0.0014326498,0.000769982,0.0003757229,0.0012900488,0.0007517235,0.001124854,0.0011109383,0.0015298547,0.0854833],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020864396,0.00015802428,0.0008066831,0.000112988724,0.0000181186,0.0000759397,0.00014754437,0.0042575854,0.0013367567,0.002453293,0.8642534,0.12617092],"study_design_scores_gemma":[0.000067353154,0.000078007964,0.0028654006,0.0002055436,0.00004414071,0.00013435472,0.00030084775,0.013664795,0.001631708,0.002647463,0.9783226,0.000037690723],"about_ca_topic_score_codex":0.17347713,"about_ca_topic_score_gemma":0.44503996,"teacher_disagreement_score":0.17347713,"about_ca_system_score_codex":0.0022738823,"about_ca_system_score_gemma":0.0050463667,"threshold_uncertainty_score":0.56833136},"labels":[],"label_agreement":null},{"id":"W582319133","doi":"","title":"Precast Concrete Bridges Roundtable","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Precast concrete; Bridge (graph theory); Engineering; Civil engineering; Construction engineering; Forensic engineering","score_opus":0.014831364535361543,"score_gpt":0.24816900026776909,"score_spread":0.23333763573240754,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W582319133","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014343172,0.0060099717,0.0030798635,0.100769736,0.06571272,0.0003498722,0.0016617891,0.0007083081,0.8073647],"genre_scores_gemma":[0.030189807,0.001244034,0.0011246084,0.018196318,0.0041050445,0.00015794039,0.00084499177,0.00022665031,0.9439106],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99898607,0.000115014365,0.000022859153,0.00013796815,0.0005338191,0.00020420399],"domain_scores_gemma":[0.99901843,0.000250535,0.00005314841,0.000051330877,0.000347233,0.0002792474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001755271,0.00058614323,0.0002473385,0.0007003676,0.0049075265,0.0030270563,0.0007831764,0.0047282726,0.15122746],"category_scores_gemma":[0.0024607119,0.000415551,0.00055848894,0.0003746954,0.0007315742,0.002402141,0.0029675232,0.0046997215,0.033272192],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000061618615,0.00004249396,0.00011073151,0.000043786662,0.000003461028,0.00016802536,0.00045612283,0.000085809304,0.0014209594,0.013205668,0.97028685,0.014114546],"study_design_scores_gemma":[0.0000038769426,0.000018360028,0.00032205693,0.000028509203,0.0000010309365,0.000018807848,0.00027942687,0.000023533881,0.00019540916,0.0006730406,0.99843043,0.0000054333195],"about_ca_topic_score_codex":0.0061768084,"about_ca_topic_score_gemma":0.03126478,"teacher_disagreement_score":0.15122746,"about_ca_system_score_codex":0.0021887773,"about_ca_system_score_gemma":0.0019117686,"threshold_uncertainty_score":0.5059062},"labels":[],"label_agreement":null},{"id":"W587439477","doi":"10.17226/22025","title":"Prefabricated Bridge Elements and Systems to Limit Traffic Disruption During Construction","year":2003,"lang":"en","type":"book","venue":"Transportation Research Board eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":29,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Bridge (graph theory); Engineering; Transport engineering; Closure (psychology); Civil engineering; Construction engineering; Popularity; Forensic engineering","score_opus":0.035165591326671124,"score_gpt":0.2788615763343566,"score_spread":0.24369598500768547,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W587439477","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5746251,0.017884111,0.2887536,0.00052622746,0.00045383332,0.0006775291,0.00045230438,0.0013003942,0.11532703],"genre_scores_gemma":[0.59305656,0.009742924,0.3418672,0.00018374318,0.000059009282,0.00024334961,0.0007637731,0.00019335913,0.05388999],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994037,0.00006107029,0.000023795075,0.00004681948,0.00043115372,0.000033384516],"domain_scores_gemma":[0.99970335,0.00007879552,0.00004885657,0.000049616392,0.00010791899,0.00001143276],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00050943124,0.0004859327,0.00020821833,0.001096297,0.00032136546,0.0005558515,0.00068790495,0.00037792226,0.0029280458],"category_scores_gemma":[0.0007911628,0.00017639865,0.00022049341,0.0005074629,0.00022580482,0.00065120985,0.0005881893,0.00035297763,0.00058172474],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011936897,0.0003311377,0.0026716925,0.0008185477,0.000020320154,0.0002414663,0.000683738,0.0126555385,0.1801698,0.007856477,0.004363898,0.7900681],"study_design_scores_gemma":[0.000105570376,0.005569233,0.04040075,0.0008244128,0.00020419867,0.0047984635,0.0011819482,0.022496989,0.36143827,0.0067592463,0.5561254,0.00009548773],"about_ca_topic_score_codex":0.0007044789,"about_ca_topic_score_gemma":0.0040952475,"teacher_disagreement_score":0.0029280458,"about_ca_system_score_codex":0.00030984005,"about_ca_system_score_gemma":0.000511976,"threshold_uncertainty_score":0.009795308},"labels":[],"label_agreement":null},{"id":"W595271297","doi":"10.33593/iccp.v10i1.445","title":"Quebec Contractor Experience with Unbonded Concrete Overlays","year":2025,"lang":"en","type":"article","venue":"Proceedings of the International Conference on Concrete Pavements","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Overlay; Forensic engineering; Civil engineering; Engineering; Computer science","score_opus":0.01374724149265751,"score_gpt":0.23577759771181378,"score_spread":0.22203035621915626,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W595271297","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9094493,0.00062176364,0.0016161763,0.002093553,0.00010047875,0.00024972516,0.0007895416,0.00017702357,0.08490244],"genre_scores_gemma":[0.8970926,0.0006134578,0.0023486156,0.00035203906,0.000018704652,0.00006664616,0.00070780923,0.00008539877,0.09871475],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9972746,0.00045322222,0.000050452723,0.00028376287,0.0011278362,0.0008101944],"domain_scores_gemma":[0.99686605,0.00024536686,0.00012980396,0.00019856077,0.0016350019,0.00092518923],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025440303,0.0005263072,0.00023700601,0.00064472074,0.00639169,0.0020507073,0.0015441984,0.0009368571,0.01840408],"category_scores_gemma":[0.0029903129,0.00034648526,0.00028516373,0.0011640876,0.0014409464,0.0009860703,0.001725295,0.001027131,0.0015754678],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015512226,0.004717214,0.19603693,0.0003879784,0.00014837633,0.009274351,0.09602464,0.009930921,0.03203449,0.014484928,0.13334015,0.50206876],"study_design_scores_gemma":[0.00015036734,0.003372456,0.20225197,0.00018324092,0.000062253384,0.0017345775,0.0717274,0.0046902667,0.0055830083,0.00035084435,0.7097509,0.00014274492],"about_ca_topic_score_codex":0.93708175,"about_ca_topic_score_gemma":0.98164314,"teacher_disagreement_score":0.062918246,"about_ca_system_score_codex":0.021370484,"about_ca_system_score_gemma":0.021078365,"threshold_uncertainty_score":0.15505445},"labels":[],"label_agreement":null},{"id":"W608176372","doi":"","title":"Innovative Process for the Development of New City of Calgary Road Construction Specifications - A Case Study","year":2012,"lang":"en","type":"article","venue":"2012 CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION: INNOVATIONS AND OPPORTUNITIES","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"CLARITY; Process (computing); Quality (philosophy); Accountability; Engineering; Process management; Sustainable development; Business; Engineering management; Transport engineering; Operations management; Computer science; Political science","score_opus":0.07473682660366157,"score_gpt":0.2515211903253766,"score_spread":0.17678436372171505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W608176372","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.7490927,0.0023962287,0.10070758,0.006206898,0.00023611278,0.009158196,0.00055260176,0.000353583,0.13129613],"genre_scores_gemma":[0.7696756,0.0016508856,0.18035947,0.0009126774,0.000031597025,0.002047974,0.00083927804,0.00023212656,0.04425039],"study_design_codex":"qualitative","study_design_gemma":"not_applicable","domain_scores_codex":[0.97177637,0.013648217,0.0013850708,0.0015353526,0.00919978,0.0024552024],"domain_scores_gemma":[0.9842742,0.005911496,0.0010720821,0.0015916767,0.0059083453,0.0012421162],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0219223,0.00070339575,0.000499258,0.003024184,0.010992162,0.009045223,0.003564297,0.003925903,0.0029713262],"category_scores_gemma":[0.016457435,0.0008403539,0.0006961643,0.004838891,0.0058001587,0.0028365972,0.006587091,0.003469792,0.00063448393],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00028018767,0.0019676334,0.018615967,0.001697075,0.00006800598,0.03337357,0.43051815,0.022626398,0.015525002,0.111417316,0.017328408,0.34658238],"study_design_scores_gemma":[0.00014738971,0.0008335194,0.021172626,0.0012400053,0.00006907081,0.0049351905,0.38206586,0.010188145,0.022449126,0.0070103244,0.54956,0.00032863434],"about_ca_topic_score_codex":0.17577,"about_ca_topic_score_gemma":0.30871454,"teacher_disagreement_score":0.82423,"about_ca_system_score_codex":0.03731534,"about_ca_system_score_gemma":0.03619899,"threshold_uncertainty_score":0.3494938},"labels":[],"label_agreement":null},{"id":"W6087492","doi":"10.22260/isarc2013/0052","title":"Material Status Index in Support of EVM","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Concordia University","funders":"","keywords":"Schedule; Float (project management); Index (typography); Computer science; Earned value management; Operations research; Project management; Engineering; Systems engineering; Project portfolio management; Operating system; World Wide Web","score_opus":0.004594481370357864,"score_gpt":0.17791917700016416,"score_spread":0.1733246956298063,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6087492","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5294016,0.0012811004,0.3416633,0.00045626189,0.00022902906,0.0008412353,0.009241973,0.002070876,0.11481471],"genre_scores_gemma":[0.8876314,0.00038717303,0.10101993,0.000022420158,0.000050026632,0.00023334594,0.0041744863,0.00007917081,0.0064021056],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980945,0.00026742608,0.0001637787,0.00020201187,0.0011829102,0.00008942295],"domain_scores_gemma":[0.9960283,0.0010386204,0.00083905144,0.00026655145,0.0017006281,0.00012679408],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0017659198,0.00063563546,0.00040073463,0.005591028,0.00030823372,0.001946708,0.0006704854,0.00030301182,0.0023827937],"category_scores_gemma":[0.0067498507,0.0001598002,0.00039893974,0.0042827716,0.00036457911,0.0012942781,0.00086121046,0.00039612895,0.0006122983],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002707665,0.00021142387,0.22787648,0.00075821794,0.00013572512,0.00045542652,0.0012134144,0.08353799,0.013297663,0.026905032,0.008306044,0.63703185],"study_design_scores_gemma":[0.000024386589,0.00080438494,0.3915465,0.0003068983,0.00013751636,0.0006880092,0.0027703524,0.4864347,0.023962094,0.011919078,0.08119781,0.00020832922],"about_ca_topic_score_codex":0.008556191,"about_ca_topic_score_gemma":0.011781878,"teacher_disagreement_score":0.008556191,"about_ca_system_score_codex":0.0014725233,"about_ca_system_score_gemma":0.0013411958,"threshold_uncertainty_score":0.017012775},"labels":[],"label_agreement":null},{"id":"W609303175","doi":"","title":"Innovative Development Framework for the Long Term Roadway Network Planning in the Municipal District of Rocky View, Alberta","year":2009,"lang":"en","type":"article","venue":"2009 ANNUAL CONFERENCE AND EXHIBITION OF THE TRANSPORTATION ASSOCIATION OF CANADA - TRANSPORTATION IN A CLIMATE OF CHANGE","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Plan (archaeology); Context (archaeology); Transportation planning; Transport engineering; Process (computing); Work (physics); Jurisdiction; Site plan; Urban planning; Sustainable development; Environmental planning; Network planning and design; Regional planning; Engineering; Computer science; Civil engineering; Geography; Political science; Telecommunications","score_opus":0.02178770084888899,"score_gpt":0.24458945435925974,"score_spread":0.22280175351037076,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W609303175","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.04392068,0.0010310572,0.67939454,0.0032954977,0.00012337267,0.002599255,0.002159765,0.0012185746,0.26625726],"genre_scores_gemma":[0.22687945,0.0007095245,0.72021705,0.00010641802,0.000012115576,0.0010796812,0.0018545715,0.00011515588,0.04902599],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9985362,0.00042052407,0.00008286582,0.00015917468,0.0005374406,0.00026375192],"domain_scores_gemma":[0.9993838,0.00009675907,0.000030787214,0.000034375247,0.00033742294,0.000116856376],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0019729713,0.0005589888,0.00026322025,0.0026826588,0.0028623967,0.0051812413,0.002748099,0.0008701046,0.006797873],"category_scores_gemma":[0.0013141205,0.00046185407,0.00055284426,0.0026231883,0.0017138502,0.001096938,0.002256053,0.0008238546,0.00067474943],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000048643004,0.00015590587,0.0051298966,0.000263913,0.000033655357,0.0017700657,0.0063345074,0.18443847,0.003423483,0.6264499,0.018212257,0.1537394],"study_design_scores_gemma":[0.00008994656,0.00012013679,0.0070341793,0.00059738767,0.00007937831,0.00077435724,0.017625103,0.22504103,0.0032253596,0.062182266,0.6830673,0.00016359339],"about_ca_topic_score_codex":0.61109877,"about_ca_topic_score_gemma":0.8097278,"teacher_disagreement_score":0.38890123,"about_ca_system_score_codex":0.025904978,"about_ca_system_score_gemma":0.057308324,"threshold_uncertainty_score":0.7823831},"labels":[],"label_agreement":null},{"id":"W611127012","doi":"","title":"Recent development in reinforced concrete slab analysis, design, and serviceability 2011 : held at the ACI fall 2011 convention : Toronto, Ontario, Canada, 21-25 October 2011","year":2011,"lang":"en","type":"book","venue":"American Concrete Institute eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Serviceability (structure); Engineering; Reinforced concrete; Forensic engineering; Slab; Convention; Civil engineering; Structural engineering; Political science; Law","score_opus":0.013164994547003622,"score_gpt":0.1920291310832172,"score_spread":0.17886413653621358,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W611127012","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.004631413,0.11836313,0.20668374,0.009710085,0.0067265374,0.00018902426,0.0020842948,0.0018803547,0.6497314],"genre_scores_gemma":[0.017127488,0.08228406,0.08319378,0.00078134035,0.0011197896,0.00011029404,0.002342792,0.00065742113,0.81238306],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99929464,0.00007018976,0.000026352707,0.00006153269,0.00051381876,0.00003352677],"domain_scores_gemma":[0.998628,0.00033309855,0.00003659717,0.00008404037,0.00085157825,0.000066822366],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015313129,0.0009076072,0.00053257437,0.0014860987,0.0007858082,0.0021071485,0.0010205791,0.00083033496,0.02139207],"category_scores_gemma":[0.0015588313,0.00062015955,0.00033702108,0.004063183,0.000943903,0.0013889498,0.00095393514,0.0011881002,0.007352641],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000018255882,0.000056076497,0.00028206597,0.00062574114,0.0000055248383,0.000049324834,0.0002610599,0.004922091,0.0018320256,0.05838385,0.44544938,0.48811457],"study_design_scores_gemma":[0.0000018017378,0.000012042514,0.0005598986,0.00016465086,0.0000041428016,0.00008356388,0.00008160695,0.0021750734,0.00079920416,0.008695607,0.9874133,0.000009105749],"about_ca_topic_score_codex":0.042495303,"about_ca_topic_score_gemma":0.1625752,"teacher_disagreement_score":0.9575047,"about_ca_system_score_codex":0.0030128146,"about_ca_system_score_gemma":0.004108495,"threshold_uncertainty_score":0.0844959},"labels":[],"label_agreement":null},{"id":"W615664348","doi":"","title":"VANCOUVER LINE ROLLS ON DESPITE BUMPY START : MURKY FUTURE OF DESIGN- BUILD CONTRACT SPAT LOOMS AS VANCOUVER LINE NEARS SWIFT FINISH","year":2001,"lang":"en","type":"article","venue":"ENR","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Precast concrete; Swift; Finish line; Track (disk drive); Engineering; Line (geometry); Architectural engineering; Civil engineering; Computer science; Geology; Mechanical engineering","score_opus":0.00847431555273453,"score_gpt":0.21133948578323206,"score_spread":0.20286517023049752,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W615664348","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11855779,0.0071796966,0.011871522,0.15438858,0.0015150921,0.00005647809,0.00053181156,0.0008794781,0.7050196],"genre_scores_gemma":[0.43761924,0.003515054,0.009844182,0.0050052796,0.00011862543,0.0000290419,0.00041409736,0.0003967797,0.54305774],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99790984,0.000255244,0.000028814993,0.00015739964,0.0012781859,0.00037041248],"domain_scores_gemma":[0.9981615,0.00011336793,0.00004339465,0.000111104506,0.00075984973,0.0008107185],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001511666,0.00025170317,0.00020644945,0.0006568109,0.011596116,0.0131138945,0.000726599,0.0020308692,0.021784605],"category_scores_gemma":[0.0024998565,0.0004014749,0.00010755573,0.0010875656,0.0037322026,0.0023997847,0.0031914103,0.0028162503,0.003791625],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009044657,0.00007582121,0.00817248,0.00008434231,0.000008676831,0.0006065898,0.009269783,0.00076026056,0.0011754967,0.10919003,0.62009263,0.25047344],"study_design_scores_gemma":[0.0000048930756,0.000018761602,0.0056139235,0.00008107257,0.0000029847738,0.00020362156,0.009790654,0.0004904679,0.0003317869,0.004511437,0.9789336,0.000016897482],"about_ca_topic_score_codex":0.516362,"about_ca_topic_score_gemma":0.85311776,"teacher_disagreement_score":0.483638,"about_ca_system_score_codex":0.01509232,"about_ca_system_score_gemma":0.0198679,"threshold_uncertainty_score":0.97297245},"labels":[],"label_agreement":null},{"id":"W625422154","doi":"","title":"Show Me the Savings","year":2005,"lang":"en","type":"article","venue":"Bridges Conversations in Global Politics and Public Policy","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"SAFER; Bridge (graph theory); Schedule; Quality (philosophy); Business; Marketing; Engineering; Risk analysis (engineering); Computer science; Computer security","score_opus":0.010467061632640173,"score_gpt":0.23523055182525843,"score_spread":0.22476349019261826,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W625422154","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0037448974,0.0045387023,0.0031316523,0.2847205,0.01893189,0.00014422026,0.0015954665,0.0016811563,0.6815116],"genre_scores_gemma":[0.021483526,0.0030711615,0.0024787178,0.06789835,0.0031914613,0.0001159618,0.0007723174,0.00072143186,0.900267],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9982717,0.0003347021,0.00004567627,0.00019887583,0.0008140036,0.0003350665],"domain_scores_gemma":[0.99698883,0.00026156212,0.00013049571,0.0002731323,0.0011625959,0.0011833567],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.001456529,0.0010548336,0.0005513999,0.00083507877,0.003893798,0.008484846,0.0010318225,0.0041941386,0.48649862],"category_scores_gemma":[0.009604153,0.00032688671,0.000775483,0.00066862593,0.0013187389,0.007896925,0.005378044,0.005570266,0.30603063],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002892687,0.00004756393,0.0002682803,0.000030499032,0.0000059651225,0.000091952716,0.00019500988,0.000030208286,0.00017885352,0.00786331,0.9477758,0.043483518],"study_design_scores_gemma":[0.000008878875,0.000018294997,0.00031747945,0.000053217136,0.000004085192,0.00018866664,0.0006238014,0.000029329069,0.00008878506,0.0028382472,0.99581856,0.000010724849],"about_ca_topic_score_codex":0.0038661798,"about_ca_topic_score_gemma":0.005686918,"teacher_disagreement_score":0.48649862,"about_ca_system_score_codex":0.0016095664,"about_ca_system_score_gemma":0.0021256479,"threshold_uncertainty_score":0.7324474},"labels":[],"label_agreement":null},{"id":"W632573533","doi":"","title":"Giving the city back to the people","year":2006,"lang":"en","type":"article","venue":"TRA - TRANSPORT RESEARCH ARENA EUROPE 2006: GOETEBORG, SWEDEN, JUNE 12TH-15TH 2006: GREENER, SAFER AND SMARTER ROAD TRANSPORT FOR EUROPE. PROCEEDINGS","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Port (circuit theory); Plan (archaeology); Quarter (Canadian coin); Engineering; Civil engineering; Business; Transport engineering; Archaeology; History","score_opus":0.02521516321126708,"score_gpt":0.2526985235952277,"score_spread":0.22748336038396064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W632573533","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0066188397,0.009745464,0.0018065866,0.10399279,0.02497599,0.00011820408,0.0008736594,0.0004616068,0.8514068],"genre_scores_gemma":[0.040092614,0.0063727098,0.0012041657,0.024473399,0.00132168,0.00007644917,0.0004966703,0.00040286712,0.92555946],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99891067,0.0002882364,0.000038971335,0.00015372418,0.0002384767,0.0003698908],"domain_scores_gemma":[0.9992273,0.000047172158,0.000030432244,0.00012155948,0.00017195227,0.00040160204],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009840399,0.00085112464,0.00049263483,0.0007887524,0.010119793,0.010590236,0.0007708318,0.0027290275,0.14781412],"category_scores_gemma":[0.0026574603,0.00033035895,0.00046612704,0.0010704354,0.0065923943,0.00662539,0.013590777,0.005414665,0.061129455],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000032509633,0.000038207312,0.00070586026,0.00013376422,0.0000081810895,0.00026806077,0.0106231375,0.000060520208,0.0002893413,0.09943301,0.8230216,0.065385886],"study_design_scores_gemma":[0.0000018025346,0.000004117898,0.00013401217,0.000046095076,8.9675285e-7,0.000029263201,0.0020767457,0.000002800054,0.000014842574,0.0007557231,0.9969308,0.0000028249744],"about_ca_topic_score_codex":0.038414612,"about_ca_topic_score_gemma":0.06660765,"teacher_disagreement_score":0.14781412,"about_ca_system_score_codex":0.0042516063,"about_ca_system_score_gemma":0.007053923,"threshold_uncertainty_score":0.49448752},"labels":[],"label_agreement":null},{"id":"W634865309","doi":"","title":"Compare Risk Allocation for Different Project Delivery Methods in Canada","year":2011,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Integrated project delivery; Timeline; Schedule; Business; Operations management; Risk analysis (engineering); Risk management; Project management; Transport engineering; Operations research; Engineering; Computer science; Finance","score_opus":0.03977327222374225,"score_gpt":0.2617257308271278,"score_spread":0.22195245860338556,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W634865309","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8970699,0.0027208426,0.010063294,0.002055046,0.00006892222,0.0013776519,0.0018396856,0.00034162358,0.08446312],"genre_scores_gemma":[0.9718865,0.0012097703,0.008091561,0.00016273705,0.000010915676,0.00028028083,0.0009115854,0.00008369663,0.017362975],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.97096217,0.0055009346,0.0013410781,0.0012071924,0.017630056,0.0033585804],"domain_scores_gemma":[0.9705566,0.008606936,0.0020112882,0.0011841323,0.015812026,0.0018289982],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013786033,0.00060447026,0.00063205045,0.0057271123,0.003461627,0.005634928,0.002929718,0.0009120909,0.00333561],"category_scores_gemma":[0.037524316,0.00068657764,0.0013328387,0.0053942446,0.001592518,0.001244189,0.0025729388,0.0012120047,0.0003646337],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0044207973,0.0014527019,0.24703105,0.0014590956,0.0011081251,0.000922544,0.015984256,0.19513464,0.0054535475,0.08048004,0.017297253,0.429256],"study_design_scores_gemma":[0.00076537346,0.002630323,0.72059005,0.00075210957,0.0006500954,0.00056008575,0.027986703,0.1620358,0.0042594476,0.0077221147,0.07135008,0.00069781917],"about_ca_topic_score_codex":0.95069945,"about_ca_topic_score_gemma":0.96293163,"teacher_disagreement_score":0.11242432,"about_ca_system_score_codex":0.11242432,"about_ca_system_score_gemma":0.06717434,"threshold_uncertainty_score":0.81569934},"labels":[],"label_agreement":null},{"id":"W63721855","doi":"10.22260/isarc2013/0162","title":"The Autonomous Real-Time System for Ubiquitous Construction Resource Tracking","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"University of Alberta","funders":"","keywords":"Computer science; Tracking system; Resource (disambiguation); Automation; Global Positioning System; Geolocation; Truck; Process (computing); Database; Systems engineering; Operating system; Engineering; Automotive engineering; Computer network","score_opus":0.0061374552570229194,"score_gpt":0.18277360198357048,"score_spread":0.17663614672654757,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W63721855","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047598664,0.001176836,0.87439734,0.000540255,0.00054010504,0.0005094004,0.0006969055,0.049120486,0.025419997],"genre_scores_gemma":[0.7890655,0.0006192178,0.17900825,0.0005808864,0.00021736092,0.0007033064,0.0018689951,0.00069469446,0.02724178],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99933785,0.00010787007,0.000035239522,0.000112869544,0.0003362324,0.00006997671],"domain_scores_gemma":[0.9995863,0.00007021037,0.00003765707,0.0000883536,0.00015495112,0.00006263416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006911719,0.0003506463,0.00046921728,0.0005719076,0.0002703549,0.00091596623,0.0008664647,0.0005978272,0.006354637],"category_scores_gemma":[0.0010685286,0.00014594645,0.00017479116,0.00041695448,0.00024407265,0.0008897429,0.001307297,0.0005284632,0.0031369436],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00090205413,0.00028177365,0.004266508,0.00024607882,0.00005445699,0.00048398733,0.0006566289,0.014632878,0.11523654,0.01163669,0.062956974,0.7886454],"study_design_scores_gemma":[0.00024620432,0.001078478,0.008218477,0.00008531865,0.00007891633,0.0010398986,0.0002775776,0.62742996,0.05898081,0.0058666505,0.29654944,0.00014826194],"about_ca_topic_score_codex":0.0013260065,"about_ca_topic_score_gemma":0.0008686648,"teacher_disagreement_score":0.006354637,"about_ca_system_score_codex":0.0003638255,"about_ca_system_score_gemma":0.00066328916,"threshold_uncertainty_score":0.021258354},"labels":[],"label_agreement":null},{"id":"W641156406","doi":"","title":"Sustainable construction modelling: a systems engineering approach","year":2013,"lang":"en","type":"article","venue":"RMIT Research Repository (RMIT University Library)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Systems engineering; Process (computing); Computer science; Information system; Information model; Building information modeling; Resource (disambiguation); Product (mathematics); Construction management; Sustainability; Engineering; Civil engineering; Software engineering","score_opus":0.013962207147368257,"score_gpt":0.17466089704633198,"score_spread":0.16069868989896371,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W641156406","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0076485756,0.0023558978,0.9303281,0.0034198815,0.00018986581,0.00016291832,0.00044657037,0.00030380022,0.055144295],"genre_scores_gemma":[0.5048893,0.010385782,0.45794988,0.0005823803,0.00048322062,0.0012002479,0.0010676631,0.00028911358,0.023152387],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9988919,0.0005118197,0.00005563881,0.00015728356,0.00030585768,0.00007753349],"domain_scores_gemma":[0.9991161,0.00052240957,0.00008257518,0.00006701545,0.0001594486,0.000052414347],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013099537,0.0012502333,0.0009332542,0.0022540542,0.0011894986,0.0037971514,0.0026265774,0.0022262894,0.0049423664],"category_scores_gemma":[0.0020264834,0.0006747758,0.0015757979,0.002616332,0.0024049364,0.0026895236,0.003384753,0.0016218764,0.0007047451],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000005717325,0.00003057602,0.0006961566,0.00017189542,0.00006364136,0.00010535351,0.00032455838,0.51002806,0.00037494386,0.47488186,0.0016971215,0.011620034],"study_design_scores_gemma":[0.000012634387,0.000037385395,0.00030241374,0.00013959494,0.000031083833,0.00008574872,0.00036269255,0.5511763,0.00025126658,0.40651774,0.04104953,0.000033620956],"about_ca_topic_score_codex":0.009568207,"about_ca_topic_score_gemma":0.008711059,"teacher_disagreement_score":0.009568207,"about_ca_system_score_codex":0.0032661497,"about_ca_system_score_gemma":0.0035259007,"threshold_uncertainty_score":0.023697734},"labels":[],"label_agreement":null},{"id":"W649371671","doi":"10.4018/979-8-3373-0700-8","title":"Project Management Information Systems","year":2025,"lang":"en","type":"book","venue":"IGI Global eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":31,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Information system; Engineering management; Project management; Project management triangle; Process (computing); Management information systems; Software project management; Process management; Extreme project management; Computer science; Engineering; Knowledge management; Systems engineering; Software; OPM3; Software system","score_opus":0.006299466604962729,"score_gpt":0.20408125251128786,"score_spread":0.19778178590632514,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W649371671","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0017605851,0.009482047,0.07283716,0.0069910865,0.002010827,0.0009373141,0.030869259,0.007617764,0.8674939],"genre_scores_gemma":[0.040900268,0.031016478,0.12707138,0.002942506,0.0017693422,0.0021640428,0.093108125,0.0030675025,0.6979604],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9951251,0.00140596,0.00081346126,0.00045889014,0.0019783224,0.00021830942],"domain_scores_gemma":[0.99334407,0.0018977058,0.00034831828,0.0015920306,0.0024278997,0.00039003434],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0046930593,0.0009100951,0.0008615034,0.008318972,0.0015645184,0.013484194,0.0020545481,0.0015552086,0.1712027],"category_scores_gemma":[0.010299908,0.0006899577,0.00065596664,0.01835824,0.00068114157,0.009436789,0.0039548213,0.0013126231,0.11996742],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002378069,0.000041761654,0.0003626503,0.0006974492,0.000017264972,0.000057908812,0.00045162177,0.0009928978,0.00029907352,0.06554667,0.48581138,0.44569758],"study_design_scores_gemma":[0.000004850265,0.000011348474,0.00021787429,0.00020711642,0.000004258695,0.00004857572,0.00015170051,0.000339462,0.00013981585,0.007442622,0.9914232,0.000009255044],"about_ca_topic_score_codex":0.0038284422,"about_ca_topic_score_gemma":0.0027290338,"teacher_disagreement_score":0.1712027,"about_ca_system_score_codex":0.0025938249,"about_ca_system_score_gemma":0.004486757,"threshold_uncertainty_score":0.57273006},"labels":[],"label_agreement":null},{"id":"W650483224","doi":"","title":"Planning of an Unconventional Urban Arterial Intersection - A Context Sensitive Approach","year":2007,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Transport engineering; Intersection (aeronautics); TRIPS architecture; Context (archaeology); Expansive; Constraint (computer-aided design); Population; Computer science; Geography; Engineering; Medicine","score_opus":0.011256930873730236,"score_gpt":0.21716547478888307,"score_spread":0.20590854391515284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W650483224","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0993996,0.0002724011,0.8642402,0.0006886614,0.000033759734,0.00072760734,0.0002510494,0.00030937174,0.034077205],"genre_scores_gemma":[0.59104794,0.0002488338,0.4048412,0.00006836726,0.000009275314,0.0003984569,0.00018265535,0.000049240836,0.0031540145],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.9962907,0.0023220351,0.00011896832,0.00033824504,0.000583629,0.00034645718],"domain_scores_gemma":[0.99908483,0.00037589684,0.00007806842,0.000114037466,0.0002327627,0.00011454868],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0020713352,0.0011231017,0.00071581715,0.0025533328,0.0020239046,0.0037078112,0.0022749028,0.0015300493,0.0050859596],"category_scores_gemma":[0.0022946652,0.00097074895,0.001006835,0.0021506085,0.0022645495,0.0023734898,0.003105239,0.0010483344,0.00038795348],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020387817,0.00032469406,0.007592268,0.00034909864,0.00010741434,0.0011773268,0.0029280027,0.72098494,0.0067118183,0.13325183,0.0018611164,0.12450765],"study_design_scores_gemma":[0.000059893708,0.0004957433,0.0048421924,0.00025155736,0.00018304294,0.00058718934,0.0084123,0.8619565,0.005607667,0.078064635,0.039378867,0.00016049006],"about_ca_topic_score_codex":0.008287922,"about_ca_topic_score_gemma":0.030822042,"teacher_disagreement_score":0.008287922,"about_ca_system_score_codex":0.0028201684,"about_ca_system_score_gemma":0.0038816342,"threshold_uncertainty_score":0.020461798},"labels":[],"label_agreement":null},{"id":"W657900759","doi":"","title":"The economics, performance, and sustainability of internally cured concrete : held at the ACI fall 2011 convention : Toronto, Ontario, Canada, 21-25 October 2011","year":2011,"lang":"en","type":"book","venue":"American Concrete Institute eBooks","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Convention; Sustainability; Engineering; Economic history; Agricultural economics; Environmental science; Political science; History; Economics; Law; Ecology; Biology","score_opus":0.005629670904393101,"score_gpt":0.1749865234501705,"score_spread":0.1693568525457774,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W657900759","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.038821343,0.10547261,0.0075634895,0.0671661,0.0017351869,0.00005129288,0.001329564,0.00018125845,0.77767915],"genre_scores_gemma":[0.13203871,0.02468173,0.0017216514,0.0007946802,0.000430299,0.000024609699,0.0003536189,0.00008086736,0.83987385],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9997813,0.000021823975,0.0000035593719,0.000016348708,0.00014950678,0.000027447793],"domain_scores_gemma":[0.99978274,0.00006015248,0.00001650671,0.0000141283135,0.00009881149,0.000027772332],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005964212,0.00037272385,0.00021671798,0.0005094235,0.0012156587,0.0021527226,0.00039225296,0.0008973436,0.009137019],"category_scores_gemma":[0.0008024696,0.00027248825,0.00013348898,0.00088410795,0.0016346858,0.0010189887,0.00056878995,0.00091561285,0.0012213982],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000050527826,0.000042251166,0.0018453813,0.00013408608,0.000011842658,0.00010675257,0.0010864615,0.004952551,0.002131781,0.12548709,0.75891346,0.10523786],"study_design_scores_gemma":[0.000009005624,0.000032768654,0.019625284,0.00034052212,0.000016757753,0.000116648356,0.0014812112,0.0016316369,0.0024308637,0.05012825,0.92413497,0.000052123512],"about_ca_topic_score_codex":0.3219475,"about_ca_topic_score_gemma":0.7881015,"teacher_disagreement_score":0.67805254,"about_ca_system_score_codex":0.010427309,"about_ca_system_score_gemma":0.009112294,"threshold_uncertainty_score":0.6401471},"labels":[],"label_agreement":null},{"id":"W6886025474","doi":"10.14288/1.0442066","title":"Owner-driven implementation of BIM : process, challenges, information quality, and value","year":2024,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Asset (computer security); Interoperability; Asset management; Process (computing); Quality (philosophy); Work (physics); Grounded theory; IT asset management","score_opus":0.012007736293944356,"score_gpt":0.2148160137759703,"score_spread":0.20280827748202593,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6886025474","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8814405,0.0012108218,0.039254732,0.016170545,0.00003813866,0.00043129147,0.00006963968,0.000116733114,0.06126753],"genre_scores_gemma":[0.9884045,0.00045461004,0.0096132755,0.00019323947,0.000007921465,0.000056279783,0.000020011143,0.000021348891,0.0012287941],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.97090775,0.014698695,0.0009610015,0.0011947637,0.009678892,0.0025589766],"domain_scores_gemma":[0.9664293,0.02080378,0.0035246976,0.0021984342,0.005895573,0.0011482848],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.022569453,0.0003308639,0.0004226434,0.0026051148,0.0040245536,0.014785719,0.0017366277,0.0017068629,0.0012987945],"category_scores_gemma":[0.03353236,0.0006561473,0.00032555533,0.004276874,0.012389372,0.0084350435,0.0068341293,0.0023723636,0.0002258156],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010947818,0.00043543527,0.114540875,0.00089647487,0.00007035542,0.002177836,0.39205855,0.003740424,0.0062009855,0.17387389,0.0025977,0.30329794],"study_design_scores_gemma":[0.000043294513,0.0003531739,0.10123087,0.0016780607,0.00010714146,0.0014388497,0.66028225,0.015482886,0.011020435,0.08152184,0.1266204,0.00022084401],"about_ca_topic_score_codex":0.04201796,"about_ca_topic_score_gemma":0.04966701,"teacher_disagreement_score":0.04201796,"about_ca_system_score_codex":0.015992593,"about_ca_system_score_gemma":0.02480817,"threshold_uncertainty_score":0.11936009},"labels":[],"label_agreement":null},{"id":"W6898754662","doi":"10.57922/tcrc.614","title":"Reality Data Capture for Reclaimed Construction Materials","year":2022,"lang":"en","type":"article","venue":"UNB Conferences","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Demolition; Reuse; Procurement; Process (computing); Quality (philosophy); Plan (archaeology); 3d scanning; Engineering design process","score_opus":0.05910249487272034,"score_gpt":0.2627918519934376,"score_spread":0.20368935712071723,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6898754662","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.28784183,0.0014471958,0.552904,0.00094282517,0.00028029975,0.0018469252,0.06395331,0.009890872,0.08089266],"genre_scores_gemma":[0.53385997,0.0014168912,0.40145952,0.0002631649,0.00004906356,0.0009064697,0.041335814,0.0008783895,0.019830728],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99792117,0.0001768249,0.00010932583,0.00034531933,0.0012915689,0.0001558648],"domain_scores_gemma":[0.9978376,0.00034027584,0.00021987906,0.00043727006,0.0010959732,0.00006908483],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010663763,0.000774737,0.00037881357,0.004017133,0.00082577433,0.0017339464,0.0011520808,0.00086857704,0.010477684],"category_scores_gemma":[0.0025657914,0.0004592884,0.0007196969,0.0040118857,0.0004839053,0.0014383633,0.0013612476,0.00069968816,0.003905899],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085467,0.0003098721,0.051335536,0.0024022758,0.00015583828,0.0018895975,0.0075267795,0.023470439,0.14166586,0.011415316,0.031163735,0.7278101],"study_design_scores_gemma":[0.000073930554,0.0005732528,0.26251152,0.0008200605,0.0002457818,0.0032661578,0.01235542,0.09739632,0.21623993,0.0056822244,0.4002792,0.0005561808],"about_ca_topic_score_codex":0.022932827,"about_ca_topic_score_gemma":0.04821938,"teacher_disagreement_score":0.022932827,"about_ca_system_score_codex":0.0013484951,"about_ca_system_score_gemma":0.0017133948,"threshold_uncertainty_score":0.045598686},"labels":[],"label_agreement":null},{"id":"W6902024741","doi":"10.6084/m9.figshare.21625526.v1","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"EEA Grants/Norway Grants","keywords":"Software deployment; Bridge (graph theory); Process (computing); Productivity; Construction industry; Adaptation (eye)","score_opus":0.048838544874795366,"score_gpt":0.251655454222142,"score_spread":0.20281690934734667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6902024741","genre_codex":"empirical","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58403,0.0043035704,0.055971425,0.01779681,0.00008782867,0.0001365145,0.000039536513,0.0002530929,0.33738124],"genre_scores_gemma":[0.9881322,0.0008630925,0.009309481,0.00020853958,0.000016160435,0.000017482149,0.000012299465,0.000015992739,0.00142472],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99199885,0.0034549113,0.0003846048,0.0006370009,0.002719238,0.0008053859],"domain_scores_gemma":[0.98954624,0.0059880186,0.0014781692,0.0010487869,0.0014443502,0.000494387],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0074089207,0.00031926294,0.00022100068,0.0018466831,0.0014593676,0.007428056,0.00090603204,0.0013074204,0.0021953147],"category_scores_gemma":[0.012407892,0.00027099077,0.00033707442,0.002707097,0.0038479627,0.004856753,0.0029775074,0.001255265,0.000549874],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001557196,0.00042110382,0.05392687,0.0011224756,0.000077023964,0.00087392813,0.035753544,0.007889875,0.007658182,0.2363035,0.0038177548,0.6519999],"study_design_scores_gemma":[0.00010841494,0.0010877596,0.21657619,0.0030463946,0.00021124106,0.0017141274,0.09589343,0.02779161,0.013958456,0.27727228,0.36212924,0.00021086891],"about_ca_topic_score_codex":0.0023004736,"about_ca_topic_score_gemma":0.0040398403,"teacher_disagreement_score":0.007428056,"about_ca_system_score_codex":0.004715495,"about_ca_system_score_gemma":0.006376651,"threshold_uncertainty_score":0.039182544},"labels":[],"label_agreement":null},{"id":"W6903141930","doi":"10.7939/r3-zzk7-t711","title":"Decarbonization of Concrete Structures: A Path Towards Industrialization","year":2024,"lang":"en","type":"dissertation","venue":"University of Alberta Library","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Formwork; Greenhouse gas; Carbon footprint; Harm; Industrialisation; Sustainable development; Construction industry; Global warming","score_opus":0.005357310055761324,"score_gpt":0.16974421414866017,"score_spread":0.16438690409289886,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6903141930","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5690634,0.053406198,0.08568564,0.037341937,0.00035171193,0.00016971782,0.00054241816,0.00072605617,0.25271288],"genre_scores_gemma":[0.9084666,0.026721584,0.04931759,0.0011989041,0.00010306021,0.000042860887,0.00031161524,0.000101962345,0.013735675],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9993843,0.0001605471,0.000024803247,0.000074085125,0.0002410162,0.00011522427],"domain_scores_gemma":[0.99890757,0.00016210435,0.00020395323,0.00024010625,0.0003972392,0.000089012494],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009841655,0.00040468917,0.00023073233,0.0007082502,0.00061060133,0.0018481419,0.0006022881,0.0011230242,0.0036473884],"category_scores_gemma":[0.0012942146,0.00019547758,0.0004557777,0.0016024992,0.0015113365,0.0022942305,0.001068743,0.0010564614,0.00058907125],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000108196815,0.00029945155,0.022847382,0.0015129058,0.000087673114,0.000411033,0.001996552,0.05210138,0.03554738,0.38195387,0.00956065,0.49357355],"study_design_scores_gemma":[0.000038168688,0.00061456993,0.067281246,0.0015838312,0.00006132667,0.00073325966,0.006023645,0.019933091,0.030921638,0.2284742,0.64424455,0.00009046698],"about_ca_topic_score_codex":0.009166647,"about_ca_topic_score_gemma":0.016741045,"teacher_disagreement_score":0.009166647,"about_ca_system_score_codex":0.0027131129,"about_ca_system_score_gemma":0.0033738841,"threshold_uncertainty_score":0.01968509},"labels":[],"label_agreement":null},{"id":"W6921079750","doi":"10.6084/m9.figshare.21641672.v1","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construct (python library); Process (computing); Productivity; Work (physics); Plan (archaeology); Visibility; Construction industry","score_opus":0.048838544874795366,"score_gpt":0.251655454222142,"score_spread":0.20281690934734667,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6921079750","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21016231,0.049672052,0.053550728,0.078054264,0.0004327551,0.00031016016,0.000084425206,0.00024225267,0.607491],"genre_scores_gemma":[0.945155,0.02591091,0.019169573,0.0028088735,0.00012940695,0.00011422379,0.00004637798,0.00003931835,0.0066261673],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9927556,0.002699687,0.00043536842,0.0005487598,0.0029836975,0.00057682116],"domain_scores_gemma":[0.99086446,0.005275893,0.0012636917,0.00056746125,0.0016767305,0.00035180568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067788498,0.00033031264,0.00029480195,0.0021063657,0.0012006441,0.009085861,0.0010190362,0.0017637981,0.0021832834],"category_scores_gemma":[0.011394008,0.00034722663,0.00044479527,0.0031228662,0.005322018,0.005922807,0.002763447,0.0022080524,0.0005987835],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060120274,0.00023493277,0.013750125,0.0028430892,0.000080016966,0.0006583975,0.016948065,0.0039550653,0.0031440342,0.524104,0.007978487,0.4262437],"study_design_scores_gemma":[0.000070900285,0.0004713503,0.044155385,0.008350639,0.00013004405,0.0007840488,0.036128353,0.005172761,0.0043078028,0.24806212,0.65226156,0.00010496996],"about_ca_topic_score_codex":0.0028641801,"about_ca_topic_score_gemma":0.0041311365,"teacher_disagreement_score":0.009085861,"about_ca_system_score_codex":0.0059196046,"about_ca_system_score_gemma":0.009295479,"threshold_uncertainty_score":0.042949975},"labels":[],"label_agreement":null},{"id":"W6923603382","doi":"10.14288/1.0434148","title":"Understanding the changes resulting from the virtualization of BIM-enabled collaborative design processes in the building construction industry","year":2023,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Context (archaeology); Maintainability; Virtualization; Usability; Collaborative design; Industry 4.0; Key (lock); Design technology","score_opus":0.03475471031923858,"score_gpt":0.19460498224724856,"score_spread":0.15985027192801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6923603382","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93618304,0.0009602397,0.022346694,0.0039049645,0.00004007318,0.00012555678,0.000044670258,0.00006102184,0.036333796],"genre_scores_gemma":[0.9932688,0.00038102266,0.005286075,0.00011161028,0.0000031248965,0.000024187857,0.000017656634,0.000010342922,0.00089727924],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99111044,0.0050237253,0.00031881832,0.0004971992,0.0017844366,0.0012655245],"domain_scores_gemma":[0.9877142,0.007723853,0.0014750535,0.0007819051,0.0017067731,0.0005981582],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008883963,0.0004423654,0.00023867661,0.0024150696,0.005009614,0.012586756,0.0014831581,0.002056607,0.0016631348],"category_scores_gemma":[0.015247606,0.0005802109,0.00052438886,0.0021380535,0.008575523,0.007747193,0.004942216,0.0021273305,0.00023787149],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019951281,0.00043875512,0.05790687,0.00068074034,0.000058232774,0.002682344,0.6778573,0.012188885,0.009274876,0.09205545,0.0016807402,0.14497624],"study_design_scores_gemma":[0.000038111873,0.00021954952,0.08904093,0.00074381876,0.00013708026,0.0010315228,0.77112156,0.023672512,0.0061404565,0.031186119,0.07653309,0.00013529576],"about_ca_topic_score_codex":0.09441883,"about_ca_topic_score_gemma":0.121189974,"teacher_disagreement_score":0.09441883,"about_ca_system_score_codex":0.015163528,"about_ca_system_score_gemma":0.01369291,"threshold_uncertainty_score":0.18773848},"labels":[],"label_agreement":null},{"id":"W6939357031","doi":"10.6084/m9.figshare.21625526","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"preprint","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"EEA Grants/Norway Grants","keywords":"Software deployment; Bridge (graph theory); Process (computing); Productivity; Construction industry; Adaptation (eye)","score_opus":0.06706578715417609,"score_gpt":0.27618025935354623,"score_spread":0.20911447219937013,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6939357031","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.57840174,0.0036407777,0.06964533,0.013067432,0.00007697982,0.000118681775,0.000048808455,0.00026747468,0.33473277],"genre_scores_gemma":[0.9872285,0.00070619694,0.01025134,0.0001399865,0.000014971705,0.000016592916,0.0000159569,0.000017379858,0.0016090184],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9934489,0.0027810524,0.00029954355,0.0005588456,0.0022590721,0.00065269216],"domain_scores_gemma":[0.9912709,0.004958006,0.0011571514,0.0010309063,0.0012146814,0.0003684542],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063027334,0.00031992656,0.00022635557,0.001588616,0.0011050786,0.0068701715,0.00081151165,0.0013101496,0.0025534567],"category_scores_gemma":[0.012413457,0.00027104528,0.00031713003,0.0027693454,0.0030275167,0.004869686,0.0027547812,0.001075655,0.0006248135],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017533425,0.00040823277,0.050007816,0.0010150869,0.00008095849,0.00081204274,0.02574081,0.010633257,0.008732527,0.2688439,0.0035860334,0.629964],"study_design_scores_gemma":[0.00011244506,0.00083049363,0.19744569,0.002190219,0.00021189364,0.0014108632,0.065418206,0.042952117,0.018384598,0.34340382,0.32746074,0.00017899834],"about_ca_topic_score_codex":0.0019816707,"about_ca_topic_score_gemma":0.0031561896,"teacher_disagreement_score":0.0068701715,"about_ca_system_score_codex":0.003734368,"about_ca_system_score_gemma":0.0045433417,"threshold_uncertainty_score":0.033332407},"labels":[],"label_agreement":null},{"id":"W6957856549","doi":"10.6084/m9.figshare.21641672","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"dissertation","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construct (python library); Process (computing); Productivity; Work (physics); Plan (archaeology); Visibility; Construction industry","score_opus":0.03973368122048685,"score_gpt":0.27491912172569494,"score_spread":0.2351854405052081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6957856549","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21016231,0.049672052,0.053550728,0.078054264,0.0004327551,0.00031016016,0.000084425206,0.00024225267,0.607491],"genre_scores_gemma":[0.945155,0.02591091,0.019169573,0.0028088735,0.00012940695,0.00011422379,0.00004637798,0.00003931835,0.0066261673],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9927556,0.002699687,0.00043536842,0.0005487598,0.0029836975,0.00057682116],"domain_scores_gemma":[0.99086446,0.005275893,0.0012636917,0.00056746125,0.0016767305,0.00035180568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067788498,0.00033031264,0.00029480195,0.0021063657,0.0012006441,0.009085861,0.0010190362,0.0017637981,0.0021832834],"category_scores_gemma":[0.011394008,0.00034722663,0.00044479527,0.0031228662,0.005322018,0.005922807,0.002763447,0.0022080524,0.0005987835],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060120274,0.00023493277,0.013750125,0.0028430892,0.000080016966,0.0006583975,0.016948065,0.0039550653,0.0031440342,0.524104,0.007978487,0.4262437],"study_design_scores_gemma":[0.000070900285,0.0004713503,0.044155385,0.008350639,0.00013004405,0.0007840488,0.036128353,0.005172761,0.0043078028,0.24806212,0.65226156,0.00010496996],"about_ca_topic_score_codex":0.0028641801,"about_ca_topic_score_gemma":0.0041311365,"teacher_disagreement_score":0.009085861,"about_ca_system_score_codex":0.0059196046,"about_ca_system_score_gemma":0.009295479,"threshold_uncertainty_score":0.042949975},"labels":[],"label_agreement":null},{"id":"W6958092758","doi":"10.60692/tre3k-1sp15","title":"Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings","year":2022,"lang":"en","type":"article","venue":"Greater South Information System","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Building information modeling; Process (computing); Software deployment; Facility management; Resource (disambiguation); Information system; System deployment","score_opus":0.01968857803279198,"score_gpt":0.20793435599524135,"score_spread":0.18824577796244937,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958092758","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18438101,0.0004318666,0.5518786,0.00034673404,0.00017880999,0.002905243,0.020104226,0.21195221,0.02782139],"genre_scores_gemma":[0.6699188,0.0003484511,0.29719013,0.00022944759,0.00007036426,0.0026121587,0.012690589,0.0032506099,0.013689519],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989825,0.00021529569,0.000068308,0.00013754137,0.00052110973,0.00007515156],"domain_scores_gemma":[0.99911565,0.00022035961,0.00011655127,0.00012770706,0.00030844763,0.00011119883],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013593897,0.001004279,0.00072478986,0.001166644,0.00022416146,0.00081663183,0.0010840679,0.0004230197,0.011206005],"category_scores_gemma":[0.0021835307,0.00032146322,0.00032879264,0.0006325892,0.00017620265,0.0010093297,0.0011624193,0.00034866875,0.002773883],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0027827497,0.0011239749,0.015507959,0.0013096591,0.00017008481,0.0007511934,0.0026074785,0.017699176,0.09620106,0.0039381986,0.11875779,0.7391507],"study_design_scores_gemma":[0.00086755137,0.0029590314,0.096074514,0.0004696298,0.00027534147,0.0015089189,0.0028448696,0.4270122,0.16056132,0.0052546565,0.30156752,0.00060440646],"about_ca_topic_score_codex":0.0018427891,"about_ca_topic_score_gemma":0.0027301162,"teacher_disagreement_score":0.011206005,"about_ca_system_score_codex":0.00043533667,"about_ca_system_score_gemma":0.00065101037,"threshold_uncertainty_score":0.037487805},"labels":[],"label_agreement":null},{"id":"W6958163608","doi":"10.60692/63j82-qqc18","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2023,"lang":"en","type":"article","venue":"Greater South Information System","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Abbott (Canada)","funders":"","keywords":"Energy consumption; Building information modeling; Energy (signal processing); Energy accounting; Consumption (sociology); Energy modeling; Energy conservation; Order (exchange); Energy management","score_opus":0.02392247102956034,"score_gpt":0.1963721344864106,"score_spread":0.17244966345685026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958163608","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9175743,0.00012677941,0.045477808,0.0003909569,0.00001839911,0.00018995287,0.0012220539,0.00049404096,0.03450589],"genre_scores_gemma":[0.9594485,0.000113436945,0.036551815,0.000015456117,0.0000023377256,0.000071397175,0.000353719,0.000040185314,0.0034031363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"not_applicable","domain_scores_codex":[0.99968994,0.00009196751,0.000015941416,0.000033589164,0.000101336416,0.00006731586],"domain_scores_gemma":[0.9997372,0.00014931979,0.000018959909,0.000031477328,0.000041189236,0.000021825426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057541573,0.0005343602,0.00042981835,0.0008922993,0.00068926625,0.0009283473,0.00065130054,0.00095223845,0.0036975506],"category_scores_gemma":[0.0006556401,0.00035995,0.00080507575,0.0014351057,0.00051509845,0.0005887328,0.0005890797,0.00040838888,0.00036864006],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002260468,0.00038333956,0.005773174,0.00014437662,0.000021987395,0.0013210196,0.00024497774,0.95256215,0.0040655616,0.005904414,0.0017637572,0.027589161],"study_design_scores_gemma":[0.00004984076,0.00021544345,0.0049607954,0.000013038941,0.000020402182,0.00027597716,0.0006918167,0.981008,0.007242821,0.001888319,0.0036050512,0.000028536215],"about_ca_topic_score_codex":0.01757913,"about_ca_topic_score_gemma":0.030465664,"teacher_disagreement_score":0.01757913,"about_ca_system_score_codex":0.0014262159,"about_ca_system_score_gemma":0.0010169806,"threshold_uncertainty_score":0.034953654},"labels":[],"label_agreement":null},{"id":"W6958332583","doi":"10.6084/m9.figshare.26688050.v1","title":"Additional file 2 of The proteome of the blood–brain barrier in rat and mouse: highly specific identification of proteins on the luminal surface of brain microvessels by in vivo glycocapture","year":2024,"lang":"en","type":"dataset","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"National Research Council Canada","funders":"","keywords":"Proteome; In vivo; Identification (biology); Decoy; Table (database)","score_opus":0.005922220157967751,"score_gpt":0.18025211306507147,"score_spread":0.1743298929071037,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6958332583","genre_codex":"dataset","genre_gemma":"dataset","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"dataset","genre_consensus":"dataset","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000055852895,0.000010649257,0.000040264837,0.000015796728,0.000005071789,0.000008798965,0.9996171,0.00012150721,0.00012497643],"genre_scores_gemma":[0.0005140942,0.000026990198,0.00037343375,0.00005309222,0.0000068065897,0.00013129151,0.9982601,0.00011750335,0.00051662483],"study_design_codex":"not_applicable","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.999099,0.000084903106,0.000122063,0.00033891198,0.00020225394,0.00015289192],"domain_scores_gemma":[0.9946537,0.0029005038,0.0005400619,0.00072484626,0.0008449827,0.00033587764],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015562018,0.0024224229,0.0018964254,0.002983226,0.0011505943,0.002559231,0.002670071,0.002549075,0.4764034],"category_scores_gemma":[0.008898481,0.00082800695,0.0013348616,0.0051706666,0.0005469452,0.0020368,0.0017884278,0.0019031868,0.17420286],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034625805,0.00011853616,0.0024116004,0.0032215065,0.00008989626,0.00006380566,0.00004247804,0.00052518497,0.0006501918,0.0005704335,0.9884433,0.0035169288],"study_design_scores_gemma":[0.0020370749,0.0001764317,0.017760405,0.001369096,0.00018924063,0.00033326133,0.00014865088,0.0009293358,0.002160494,0.00427188,0.97051483,0.00010932236],"about_ca_topic_score_codex":0.007232284,"about_ca_topic_score_gemma":0.0128312595,"teacher_disagreement_score":0.4764034,"about_ca_system_score_codex":0.0014305734,"about_ca_system_score_gemma":0.0020961093,"threshold_uncertainty_score":0.74684703},"labels":[],"label_agreement":null},{"id":"W6967234867","doi":"10.5281/zenodo.10817950","title":"ANNEXE. Organizational competencies for BIM adoption","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Competence (human resources); Organizational structure; Key (lock); Process (computing)","score_opus":0.021449310914312944,"score_gpt":0.2130947900974754,"score_spread":0.19164547918316244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967234867","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02743887,0.001043859,0.0067691505,0.006595751,0.0007547163,0.0021896833,0.036871735,0.0005697432,0.9177665],"genre_scores_gemma":[0.22530311,0.0034525723,0.04571045,0.002872946,0.00030477066,0.0070022824,0.062019642,0.00046324913,0.652871],"study_design_codex":"not_applicable","study_design_gemma":"qualitative","domain_scores_codex":[0.99770147,0.0005769708,0.00020219227,0.00018843068,0.0010226764,0.00030823672],"domain_scores_gemma":[0.9922558,0.0022021553,0.0006097435,0.0003754628,0.003967881,0.00058888295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002840664,0.0004656019,0.0001788831,0.0017864428,0.0021828606,0.0027979212,0.0005650133,0.0012537732,0.18933968],"category_scores_gemma":[0.011936345,0.00030870162,0.0003351181,0.0016067728,0.00061351864,0.0019556093,0.0014650521,0.0014308692,0.04328069],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017426503,0.00046861442,0.028601633,0.0013583914,0.000017678854,0.0007712398,0.007196692,0.00095002906,0.0017028463,0.20438473,0.56022894,0.19414487],"study_design_scores_gemma":[0.000014866632,0.000051163912,0.042249873,0.0009846938,0.000006098636,0.00038774978,0.0030818721,0.00015541847,0.001013619,0.0051678675,0.946864,0.000022759954],"about_ca_topic_score_codex":0.02315589,"about_ca_topic_score_gemma":0.037634797,"teacher_disagreement_score":0.18933968,"about_ca_system_score_codex":0.002949222,"about_ca_system_score_gemma":0.006509898,"threshold_uncertainty_score":0.6334044},"labels":[],"label_agreement":null},{"id":"W6967248217","doi":"10.5281/zenodo.10166982","title":"Atheta (Datomicra) dadopora Thomson","year":2023,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"Natural Resources Canada; Agriculture and Agri-Food Canada; Canadian Forest Service","funders":"","keywords":"Balsam; Yellow birch; Black spruce; Bark (sound); Maple; Hardwood; Swamp; Plant litter","score_opus":0.02568189871025112,"score_gpt":0.2186263458914383,"score_spread":0.1929444471811872,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967248217","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.14728251,0.0137467375,0.0041397237,0.001371708,0.0009918759,0.0005754427,0.0069418494,0.0006989869,0.8242511],"genre_scores_gemma":[0.8899642,0.008139004,0.0057448377,0.0016865574,0.00046173212,0.00053719373,0.0041164337,0.00008436463,0.08926574],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9998116,0.000019629035,0.00001956831,0.00007421519,0.000047988222,0.00002702998],"domain_scores_gemma":[0.999871,0.000029515732,0.000041518677,0.000015077101,0.000024789924,0.000018118613],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00008979144,0.0010078168,0.0004387096,0.0022868707,0.0019834673,0.0005021129,0.0005183561,0.0005905851,0.031064706],"category_scores_gemma":[0.00037946523,0.0003392051,0.00025454318,0.00095165527,0.00063040655,0.001379921,0.0015136827,0.00083251804,0.0086897975],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005036086,0.00018779216,0.016622068,0.0014923948,0.00007910927,0.0047439565,0.0022636175,0.00081662554,0.023099989,0.011817311,0.07614219,0.8622313],"study_design_scores_gemma":[0.000055350087,0.00014145304,0.082518145,0.0006121959,0.000113316644,0.008537103,0.0010633648,0.00040110882,0.0017556828,0.001672198,0.90309554,0.00003461421],"about_ca_topic_score_codex":0.004029455,"about_ca_topic_score_gemma":0.010852205,"teacher_disagreement_score":0.031064706,"about_ca_system_score_codex":0.0004683294,"about_ca_system_score_gemma":0.00030105028,"threshold_uncertainty_score":0.10392183},"labels":[],"label_agreement":null},{"id":"W6967556242","doi":"10.5281/zenodo.10817951","title":"ANNEXE. Organizational competencies for BIM adoption","year":2024,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Competence (human resources); Organizational structure; Key (lock); Process (computing)","score_opus":0.021449310914312944,"score_gpt":0.2130947900974754,"score_spread":0.19164547918316244,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6967556242","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02743887,0.001043859,0.0067691505,0.006595751,0.0007547163,0.0021896833,0.036871735,0.0005697432,0.9177665],"genre_scores_gemma":[0.22530311,0.0034525723,0.04571045,0.002872946,0.00030477066,0.0070022824,0.062019642,0.00046324913,0.652871],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99770147,0.0005769708,0.00020219227,0.00018843068,0.0010226764,0.00030823672],"domain_scores_gemma":[0.9922558,0.0022021553,0.0006097435,0.0003754628,0.003967881,0.00058888295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.002840664,0.0004656019,0.0001788831,0.0017864428,0.0021828606,0.0027979212,0.0005650133,0.0012537732,0.18933968],"category_scores_gemma":[0.011936345,0.00030870162,0.0003351181,0.0016067728,0.00061351864,0.0019556093,0.0014650521,0.0014308692,0.04328069],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017426503,0.00046861442,0.028601633,0.0013583914,0.000017678854,0.0007712398,0.007196692,0.00095002906,0.0017028463,0.20438473,0.56022894,0.19414487],"study_design_scores_gemma":[0.000014866632,0.000051163912,0.042249873,0.0009846938,0.000006098636,0.00038774978,0.0030818721,0.00015541847,0.001013619,0.0051678675,0.946864,0.000022759954],"about_ca_topic_score_codex":0.02315589,"about_ca_topic_score_gemma":0.037634797,"teacher_disagreement_score":0.18933968,"about_ca_system_score_codex":0.002949222,"about_ca_system_score_gemma":0.006509898,"threshold_uncertainty_score":0.6334044},"labels":[],"label_agreement":null},{"id":"W6976681777","doi":"10.60692/32jny-c4670","title":"Bim-based energy analysis and optimization using insight 360 (case study)","year":2023,"lang":"en","type":"article","venue":"Greater South Information System","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Abbott (Canada)","funders":"","keywords":"Energy consumption; Building information modeling; Energy (signal processing); Energy accounting; Consumption (sociology); Energy modeling; Energy conservation; Order (exchange); Energy management","score_opus":0.02392247102956034,"score_gpt":0.1963721344864106,"score_spread":0.17244966345685026,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6976681777","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9175743,0.00012677941,0.045477808,0.0003909569,0.00001839911,0.00018995287,0.0012220539,0.00049404096,0.03450589],"genre_scores_gemma":[0.9594485,0.000113436945,0.036551815,0.000015456117,0.0000023377256,0.000071397175,0.000353719,0.000040185314,0.0034031363],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99968994,0.00009196751,0.000015941416,0.000033589164,0.000101336416,0.00006731586],"domain_scores_gemma":[0.9997372,0.00014931979,0.000018959909,0.000031477328,0.000041189236,0.000021825426],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00057541573,0.0005343602,0.00042981835,0.0008922993,0.00068926625,0.0009283473,0.00065130054,0.00095223845,0.0036975506],"category_scores_gemma":[0.0006556401,0.00035995,0.00080507575,0.0014351057,0.00051509845,0.0005887328,0.0005890797,0.00040838888,0.00036864006],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002260468,0.00038333956,0.005773174,0.00014437662,0.000021987395,0.0013210196,0.00024497774,0.95256215,0.0040655616,0.005904414,0.0017637572,0.027589161],"study_design_scores_gemma":[0.00004984076,0.00021544345,0.0049607954,0.000013038941,0.000020402182,0.00027597716,0.0006918167,0.981008,0.007242821,0.001888319,0.0036050512,0.000028536215],"about_ca_topic_score_codex":0.01757913,"about_ca_topic_score_gemma":0.030465664,"teacher_disagreement_score":0.01757913,"about_ca_system_score_codex":0.0014262159,"about_ca_system_score_gemma":0.0010169806,"threshold_uncertainty_score":0.034953654},"labels":[],"label_agreement":null},{"id":"W6977397330","doi":"10.6084/m9.figshare.21625526.v2","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2023,"lang":"en","type":"article","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"EEA Grants/Norway Grants","keywords":"Software deployment; Bridge (graph theory); Process (computing); Productivity; Construction industry; Adaptation (eye)","score_opus":0.06487348351168756,"score_gpt":0.2701318257887526,"score_spread":0.20525834227706505,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977397330","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.58567333,0.004315606,0.05589706,0.017726267,0.000087557324,0.00013665027,0.0000392689,0.00025191906,0.33587232],"genre_scores_gemma":[0.9881291,0.0008695837,0.009314989,0.00020877193,0.000016101589,0.000017383854,0.00001222785,0.000015940492,0.0014159849],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9920328,0.0034389042,0.00038348767,0.0006310412,0.002713338,0.0008003923],"domain_scores_gemma":[0.9895471,0.005998787,0.0014797205,0.0010404042,0.0014411525,0.0004928199],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007409306,0.0003163449,0.00022030345,0.0018383826,0.0014514612,0.0073703313,0.00090231595,0.0013007245,0.002174817],"category_scores_gemma":[0.012364088,0.00026951666,0.0003354515,0.0027092448,0.0038471075,0.0048118783,0.0029607392,0.0012531207,0.0005460079],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00015545607,0.0004198451,0.054081842,0.0011188323,0.00007635854,0.00087215804,0.03577295,0.007855061,0.0076606185,0.23470679,0.003801794,0.6534783],"study_design_scores_gemma":[0.00010803708,0.0010917458,0.21775582,0.0030454432,0.00020995789,0.0017214979,0.09608886,0.027818922,0.013982164,0.27633643,0.36163056,0.00021051627],"about_ca_topic_score_codex":0.0023225823,"about_ca_topic_score_gemma":0.004051897,"teacher_disagreement_score":0.007409306,"about_ca_system_score_codex":0.0047192136,"about_ca_system_score_gemma":0.0063806437,"threshold_uncertainty_score":0.03918463},"labels":[],"label_agreement":null},{"id":"W6977425687","doi":"10.6084/m9.figshare.21641675","title":"Adoption of Artificial Intelligence for Optimum Productivity in the Construction Industry","year":2022,"lang":"en","type":"dissertation","venue":"Figshare","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construct (python library); Process (computing); Productivity; Work (physics); Plan (archaeology); Visibility; Construction industry","score_opus":0.03973368122048685,"score_gpt":0.27491912172569494,"score_spread":0.2351854405052081,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6977425687","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21016231,0.049672052,0.053550728,0.078054264,0.0004327551,0.00031016016,0.000084425206,0.00024225267,0.607491],"genre_scores_gemma":[0.945155,0.02591091,0.019169573,0.0028088735,0.00012940695,0.00011422379,0.00004637798,0.00003931835,0.0066261673],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9927556,0.002699687,0.00043536842,0.0005487598,0.0029836975,0.00057682116],"domain_scores_gemma":[0.99086446,0.005275893,0.0012636917,0.00056746125,0.0016767305,0.00035180568],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0067788498,0.00033031264,0.00029480195,0.0021063657,0.0012006441,0.009085861,0.0010190362,0.0017637981,0.0021832834],"category_scores_gemma":[0.011394008,0.00034722663,0.00044479527,0.0031228662,0.005322018,0.005922807,0.002763447,0.0022080524,0.0005987835],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000060120274,0.00023493277,0.013750125,0.0028430892,0.000080016966,0.0006583975,0.016948065,0.0039550653,0.0031440342,0.524104,0.007978487,0.4262437],"study_design_scores_gemma":[0.000070900285,0.0004713503,0.044155385,0.008350639,0.00013004405,0.0007840488,0.036128353,0.005172761,0.0043078028,0.24806212,0.65226156,0.00010496996],"about_ca_topic_score_codex":0.0028641801,"about_ca_topic_score_gemma":0.0041311365,"teacher_disagreement_score":0.009085861,"about_ca_system_score_codex":0.0059196046,"about_ca_system_score_gemma":0.009295479,"threshold_uncertainty_score":0.042949975},"labels":[],"label_agreement":null},{"id":"W6979915495","doi":"","title":"Analysis of the Adoption and Implementation of Virtual Reality Technologies for Modular Construction","year":2009,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Virtual reality; Modular design; Key (lock); Work (physics); Augmented reality","score_opus":0.008933182856943096,"score_gpt":0.24512214896967024,"score_spread":0.23618896611272716,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6979915495","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9905049,0.00010402598,0.0007231723,0.0001992996,0.0000065408667,0.000079805606,0.00011626272,0.000017208089,0.008248879],"genre_scores_gemma":[0.997498,0.000113519265,0.0007734136,0.00003132588,0.00000380541,0.000023720795,0.00011171572,0.000009352478,0.0014351645],"study_design_codex":"observational","study_design_gemma":"qualitative","domain_scores_codex":[0.9910966,0.002925552,0.00043464502,0.00067955983,0.0040889164,0.00077471],"domain_scores_gemma":[0.9412386,0.029893106,0.009340339,0.0024224953,0.015873685,0.0012317841],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0061653443,0.00018076575,0.00020921078,0.0023540033,0.0006545737,0.0019193898,0.000882992,0.00063688675,0.0039751385],"category_scores_gemma":[0.050190922,0.00028761703,0.0003905389,0.0026631597,0.0006492971,0.0017324301,0.001326407,0.0007119539,0.0006036412],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00074234704,0.0009513172,0.6363126,0.00057688006,0.00012492145,0.00112604,0.03903824,0.0024209858,0.0075348276,0.0066905674,0.0024160638,0.30206528],"study_design_scores_gemma":[0.000016196036,0.0007501356,0.9706177,0.000119031254,0.00007530841,0.0003023812,0.017213134,0.0023531814,0.0016380484,0.00030440657,0.0065811076,0.000029278499],"about_ca_topic_score_codex":0.009002752,"about_ca_topic_score_gemma":0.0114975,"teacher_disagreement_score":0.009002752,"about_ca_system_score_codex":0.0022634626,"about_ca_system_score_gemma":0.0031286785,"threshold_uncertainty_score":0.032605827},"labels":[],"label_agreement":null},{"id":"W6980217069","doi":"","title":"BIM Supports and Secure BIPV Design &amp; Engineering","year":2023,"lang":"en","type":"other","venue":"View","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas; Universitat Politècnica de Catalunya; Universidad de Antofagasta; Turun Yliopisto; Università di Catania; Technische Universiteit Delft; Université de Liège; University of Toronto; Technische Universität Berlin; Agroscope; Technische Universiteit Eindhoven; KU Leuven; Radboud Universiteit","keywords":"Building-integrated photovoltaics; Work (physics); Key (lock); Photovoltaic system","score_opus":0.012868205740812048,"score_gpt":0.2038154105325668,"score_spread":0.19094720479175475,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6980217069","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0053611994,0.000089115245,0.20644006,0.00061006,0.00021528358,0.000111577356,0.0011338737,0.006428336,0.77961046],"genre_scores_gemma":[0.22443984,0.0005203965,0.23326169,0.00047898025,0.000141786,0.00033716418,0.0072769797,0.009647277,0.5238959],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9980349,0.00023827102,0.000039155002,0.000097532065,0.001376909,0.00021321031],"domain_scores_gemma":[0.9987558,0.000121678386,0.000051331823,0.000481162,0.00047557623,0.00011451991],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012547676,0.00090908416,0.00042766854,0.0026633497,0.0016439533,0.0051967413,0.0015188863,0.0014489257,0.09338871],"category_scores_gemma":[0.0028184715,0.0005225706,0.0004989559,0.0015522824,0.0010992389,0.003452483,0.0076578516,0.0013452658,0.055384446],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008240114,0.00017435157,0.0010193345,0.00017591922,0.000013124455,0.00030660295,0.0007107783,0.014734802,0.008856997,0.3314689,0.14588213,0.49657467],"study_design_scores_gemma":[0.000017299906,0.000030565006,0.0014078688,0.0001554766,0.000007892018,0.0002722723,0.00051669654,0.047239408,0.009521253,0.05324576,0.8875526,0.000032808293],"about_ca_topic_score_codex":0.0057413415,"about_ca_topic_score_gemma":0.010002732,"teacher_disagreement_score":0.09338871,"about_ca_system_score_codex":0.0011488993,"about_ca_system_score_gemma":0.0019489402,"threshold_uncertainty_score":0.31241637},"labels":[],"label_agreement":null},{"id":"W6986689578","doi":"","title":"In Q1 2021, the “Cost-of-Construction Index” increased by 2.94% over a year : construction cost index - first quarter 2021","year":2021,"lang":"en","type":"article","venue":"Gallica (Bibliothèque nationale de France)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Index (typography); Power (physics); Cost analysis; Measure (data warehouse)","score_opus":0.004595401768025009,"score_gpt":0.20824979444148298,"score_spread":0.20365439267345797,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6986689578","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21405874,0.004923855,0.012080734,0.022487484,0.0075251907,0.0007309803,0.50265473,0.0038668797,0.23167147],"genre_scores_gemma":[0.44001725,0.0027485227,0.011989124,0.0049743266,0.00095338706,0.00086636504,0.373978,0.0010234849,0.16344947],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9972362,0.000174173,0.00013794245,0.00022644027,0.0017366514,0.00048870395],"domain_scores_gemma":[0.99553984,0.00024042129,0.00041928497,0.000108810316,0.003257235,0.0004344152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025079576,0.00096437626,0.00059093203,0.0037344336,0.0008231637,0.0033759144,0.0008056915,0.0017502835,0.013327137],"category_scores_gemma":[0.006371511,0.00034135295,0.00073758455,0.004366879,0.00035519167,0.0012814697,0.0014320893,0.0013887654,0.007759953],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00065128424,0.00022723187,0.08422618,0.0010395262,0.0001441411,0.00035735164,0.0005301631,0.0045543043,0.0054612784,0.01639215,0.76380825,0.1226082],"study_design_scores_gemma":[0.00004341487,0.00015167418,0.2991433,0.00012621314,0.000047440823,0.00020053495,0.0006715844,0.0029005653,0.00350392,0.0014385383,0.69167423,0.00009852672],"about_ca_topic_score_codex":0.17197345,"about_ca_topic_score_gemma":0.14301634,"teacher_disagreement_score":0.17197345,"about_ca_system_score_codex":0.006226005,"about_ca_system_score_gemma":0.0070691654,"threshold_uncertainty_score":0.34194493},"labels":[],"label_agreement":null},{"id":"W6987818756","doi":"","title":"Using the Internet to Transfer Knowledge on Concrete Durability: Improving and Fostering Knowledge Exchange, eWork and eBusiness in Architecture, Engineering and Construction","year":2002,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"U.S. Army Corps of Engineers; National Research Council Canada","keywords":"The Internet; Knowledge transfer; Government (linguistics); Information Dissemination; Technology transfer; Information transfer; Information system; Dissemination","score_opus":0.02378580382771166,"score_gpt":0.2176808134266009,"score_spread":0.19389500959888922,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6987818756","genre_codex":"empirical","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5295098,0.0082332,0.19439282,0.02927419,0.00029320086,0.0005882527,0.00009050954,0.0007851028,0.23683295],"genre_scores_gemma":[0.86553496,0.007069546,0.10819425,0.00093753095,0.00015616025,0.00026175176,0.00012621062,0.00009119195,0.0176285],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99567837,0.0027086644,0.00025648152,0.00023101008,0.0009558888,0.00016964925],"domain_scores_gemma":[0.99206173,0.0054145693,0.00054526405,0.0009508576,0.0007382348,0.00028933852],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008158798,0.000343567,0.00025990454,0.003767557,0.0017879214,0.006668792,0.0010811918,0.0016768642,0.0040220157],"category_scores_gemma":[0.01609548,0.00026594082,0.0002950502,0.0035425355,0.0030539683,0.013917023,0.004555035,0.0008620548,0.00077346776],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00011588083,0.0008951943,0.0074815936,0.00059836335,0.000043002405,0.00023918004,0.010028646,0.0025963886,0.0037523988,0.113069974,0.0047090426,0.8564702],"study_design_scores_gemma":[0.00034455984,0.0010051817,0.030581644,0.003052076,0.0004854607,0.0016008437,0.026585279,0.052742295,0.03286519,0.5127476,0.33777326,0.00021661655],"about_ca_topic_score_codex":0.0028385536,"about_ca_topic_score_gemma":0.0026195454,"teacher_disagreement_score":0.008158798,"about_ca_system_score_codex":0.001418495,"about_ca_system_score_gemma":0.0030947132,"threshold_uncertainty_score":0.0431484},"labels":[],"label_agreement":null},{"id":"W6990339598","doi":"","title":"Developing a Community: Qualitative Approaches to Understanding the Role of Community Engagement in Gameswork","year":2023,"lang":"en","type":"dissertation","venue":"UWSpace (University of Waterloo)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Social Sciences and Humanities Research Council of Canada; University of Toronto","keywords":"Qualitative research; Work (physics); Community engagement; Consumption (sociology); Investment (military); Qualitative property; Journalism; Content analysis","score_opus":0.15335893160788094,"score_gpt":0.25994143566378364,"score_spread":0.1065825040559027,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6990339598","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.31271753,0.004936818,0.49849904,0.04225619,0.0012600722,0.009973295,0.002182211,0.0003725946,0.12780231],"genre_scores_gemma":[0.81360143,0.002733447,0.1484957,0.0043574385,0.000095932606,0.013209485,0.00038574846,0.00026998602,0.01685086],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.94762933,0.04695124,0.0006680659,0.0013441483,0.0018883303,0.0015188153],"domain_scores_gemma":[0.9229591,0.06744522,0.0016983643,0.0024414242,0.0037003253,0.0017556148],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.053670295,0.00091760897,0.00083426153,0.0043185493,0.011916166,0.010749509,0.0035226636,0.0026428152,0.0062772953],"category_scores_gemma":[0.047495656,0.0010361943,0.0009067199,0.0040455926,0.02252173,0.011058072,0.012917413,0.005414927,0.0006737374],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00003348687,0.00005290563,0.00080079056,0.00034509992,0.000007751844,0.00024897707,0.9161541,0.00032174276,0.00043857362,0.0658992,0.0019466376,0.01375085],"study_design_scores_gemma":[0.000036253896,0.000055742967,0.0005552297,0.0013021489,0.0000131048455,0.00021467404,0.86900276,0.0013429763,0.0008228779,0.058989998,0.06761851,0.00004569628],"about_ca_topic_score_codex":0.012079336,"about_ca_topic_score_gemma":0.017753663,"teacher_disagreement_score":0.053670295,"about_ca_system_score_codex":0.010444968,"about_ca_system_score_gemma":0.013318117,"threshold_uncertainty_score":0.2838391},"labels":[],"label_agreement":null},{"id":"W6996021006","doi":"","title":"In Q3 2021, the “Cost-of-Construction Index” rose by 6.86% over a year : Construction cost index - third quarter 2021","year":2021,"lang":"en","type":"article","venue":"Gallica (Bibliothèque nationale de France)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Rose (mathematics); Quarter (Canadian coin); Index (typography); Square (algebra); Power (physics)","score_opus":0.005146866553903096,"score_gpt":0.2175297634231343,"score_spread":0.2123828968692312,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996021006","genre_codex":"dataset","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.13686228,0.005769422,0.010308797,0.028401429,0.009083832,0.0005915614,0.5467972,0.0038293172,0.2583562],"genre_scores_gemma":[0.34260213,0.00392584,0.012877477,0.008374821,0.001121826,0.00091903826,0.43797565,0.0013419389,0.19086121],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9974673,0.00012768508,0.00012404448,0.00016947273,0.001707318,0.0004043307],"domain_scores_gemma":[0.9959857,0.00019957196,0.000351588,0.00009165898,0.0029401083,0.00043136126],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023523855,0.00082398736,0.0005227348,0.003312977,0.00082742295,0.003633633,0.000784488,0.001777629,0.014341337],"category_scores_gemma":[0.005780882,0.00029427206,0.0007082178,0.0048943134,0.00041573783,0.0012894345,0.0014088396,0.0015502158,0.009080312],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00035666212,0.00011328326,0.042264283,0.00057381997,0.000068998896,0.00019058748,0.0003659693,0.0016863254,0.002314705,0.01339673,0.86580265,0.07286596],"study_design_scores_gemma":[0.000029247494,0.000087139706,0.19440323,0.00011069187,0.000027032853,0.00013157628,0.0006176647,0.0014299465,0.0018460384,0.0013360848,0.7999121,0.00006923803],"about_ca_topic_score_codex":0.24374741,"about_ca_topic_score_gemma":0.2295079,"teacher_disagreement_score":0.24374741,"about_ca_system_score_codex":0.0068091056,"about_ca_system_score_gemma":0.0082578715,"threshold_uncertainty_score":0.4846573},"labels":[],"label_agreement":null},{"id":"W6996630583","doi":"","title":"So Where the Bloody Hell Are You?","year":2014,"lang":"en","type":"other","venue":"CBS Research Portal (Copenhagen Business School)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Slogan; Offensive; Tourism; Globalization; Face (sociological concept); Football; Hollywood; Surprise; Shot (pellet)","score_opus":0.02512625123010229,"score_gpt":0.28040415472432995,"score_spread":0.25527790349422763,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6996630583","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05483468,0.0121806,0.0024586958,0.16465676,0.005924005,0.000085356165,0.00010774214,0.000045642915,0.7597066],"genre_scores_gemma":[0.55638456,0.012790489,0.001262209,0.037776507,0.0018178036,0.000086361346,0.00010480413,0.00020299418,0.38957432],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9976667,0.0011142673,0.000051695853,0.00036195773,0.00045264178,0.00035273904],"domain_scores_gemma":[0.9967374,0.001388219,0.00040785412,0.00014375523,0.0007382605,0.00058441266],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.003013406,0.00040511665,0.00026951538,0.0008878194,0.0063738152,0.012194391,0.00072239497,0.0023730937,0.0144892335],"category_scores_gemma":[0.005622814,0.000286584,0.00036030743,0.00072736,0.012435943,0.009093838,0.0022813494,0.005847964,0.00632909],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000059554844,0.0001450649,0.00337879,0.00032296736,0.000016954491,0.0004813251,0.20876992,0.000059563474,0.0005113297,0.55063164,0.20209166,0.033531178],"study_design_scores_gemma":[0.000010107373,0.000036220652,0.0040782895,0.0006693052,0.000010601814,0.0003092862,0.14042854,0.000131221,0.00039395233,0.033705708,0.8202014,0.000025259336],"about_ca_topic_score_codex":0.010124394,"about_ca_topic_score_gemma":0.010857775,"teacher_disagreement_score":0.0144892335,"about_ca_system_score_codex":0.0043438417,"about_ca_system_score_gemma":0.0031296157,"threshold_uncertainty_score":0.04847133},"labels":[],"label_agreement":null},{"id":"W6997176477","doi":"","title":"UGE International Reports 2015 First Quarter Financial Results - Energy (ENERGY01) News","year":2015,"lang":"en","type":"other","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Quarter (Canadian coin); Energy (signal processing); Work (physics); High energy","score_opus":0.0059111979192492245,"score_gpt":0.19720912181236835,"score_spread":0.19129792389311914,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6997176477","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0009053095,0.0015199394,0.0006263756,0.019191457,0.014959818,0.00008534593,0.0075770933,0.0017761769,0.9533585],"genre_scores_gemma":[0.0036243703,0.00055665465,0.00025611694,0.0032031767,0.0010563218,0.000029482266,0.0030853397,0.0005265884,0.98766196],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99817646,0.00009937899,0.000048086382,0.00011756692,0.001259754,0.00029871627],"domain_scores_gemma":[0.9979792,0.00020467125,0.000091872746,0.00017382388,0.0010370853,0.00051342294],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0018968019,0.0009253686,0.0005395969,0.0021612914,0.0019711845,0.01205496,0.0010016822,0.005015124,0.3437415],"category_scores_gemma":[0.0052526835,0.00041247712,0.00088158593,0.0016771044,0.00076375104,0.0031107601,0.0019976299,0.0037094443,0.25008076],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000021152318,0.000017910595,0.00005719913,0.000016469752,0.0000014657269,0.000020307176,0.0000054254897,0.000027360426,0.00003962348,0.0022254863,0.98975664,0.0078109507],"study_design_scores_gemma":[0.00000835464,0.000011173306,0.0005757829,0.000037418125,0.000002127338,0.000016217684,0.000028195542,0.000081144826,0.00017936548,0.001050351,0.9980034,0.0000063166517],"about_ca_topic_score_codex":0.014598621,"about_ca_topic_score_gemma":0.0278666,"teacher_disagreement_score":0.3437415,"about_ca_system_score_codex":0.0028618784,"about_ca_system_score_gemma":0.00369818,"threshold_uncertainty_score":0.93607306},"labels":[],"label_agreement":null},{"id":"W6999042324","doi":"","title":"BIM Introduction for QS Practitioners. Invited Presentation","year":2012,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Presentation (obstetrics); Key (lock); Focus (optics)","score_opus":0.012573451607888485,"score_gpt":0.23719412576614404,"score_spread":0.22462067415825557,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999042324","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0026333395,0.006080241,0.041831013,0.17469546,0.11085175,0.0014729557,0.006549752,0.0068192366,0.6490662],"genre_scores_gemma":[0.010907765,0.0037414185,0.00958344,0.0154835405,0.010972189,0.0005520387,0.0021317126,0.0014214657,0.94520646],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9957312,0.00092812727,0.00023419918,0.0002771755,0.0025076317,0.00032167733],"domain_scores_gemma":[0.9821107,0.0023103603,0.0003941738,0.0007939206,0.012021977,0.0023688148],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.004664507,0.0008390677,0.00071671343,0.0015587675,0.001640497,0.004357067,0.0015177203,0.003892679,0.49417892],"category_scores_gemma":[0.021670006,0.0006026117,0.00050266576,0.0013251114,0.00095688226,0.004299547,0.00459234,0.0033933406,0.2519857],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000161985,0.000021038322,0.00006021815,0.00010546795,9.3401644e-7,0.00004428954,0.00014453231,0.000055396467,0.00023047373,0.0018444818,0.96860325,0.028873643],"study_design_scores_gemma":[0.000005054268,0.000011769435,0.00023580124,0.00012486638,7.803036e-7,0.00006616007,0.00025866105,0.00009761855,0.00011158429,0.0015181615,0.9975623,0.0000073278593],"about_ca_topic_score_codex":0.0023355104,"about_ca_topic_score_gemma":0.005442253,"teacher_disagreement_score":0.49417892,"about_ca_system_score_codex":0.0017717658,"about_ca_system_score_gemma":0.004516822,"threshold_uncertainty_score":0.7214924},"labels":[],"label_agreement":null},{"id":"W6999142127","doi":"","title":"Challenges and Opportunities for the Canadian Construction IT Industry","year":2007,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Construction industry; Information technology; Government (linguistics); Industry 4.0; Work (physics)","score_opus":0.0711636855586013,"score_gpt":0.24077593722735172,"score_spread":0.16961225166875044,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W6999142127","genre_codex":"commentary","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.051961932,0.006770728,0.0015122058,0.5840812,0.007987409,0.00022433835,0.00071283267,0.00029396353,0.34645534],"genre_scores_gemma":[0.3344065,0.011008629,0.004860175,0.030492527,0.001543997,0.00011465211,0.0009835911,0.00022318501,0.6163668],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.97767127,0.0016948046,0.00047925537,0.0008621925,0.013665728,0.0056267926],"domain_scores_gemma":[0.9267593,0.003911457,0.0011020246,0.0008952069,0.054421738,0.01291027],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01339171,0.00040320432,0.0005809784,0.0026556714,0.019597413,0.017074862,0.0028466904,0.006066572,0.063773945],"category_scores_gemma":[0.025975266,0.00044845685,0.00066331757,0.004551758,0.00501314,0.003313583,0.0031775846,0.003933507,0.0068617957],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010003718,0.00008395007,0.010453158,0.0003960277,0.000020017416,0.0008050791,0.004762375,0.0005847256,0.00081498805,0.034119103,0.82835263,0.11950788],"study_design_scores_gemma":[0.000019073952,0.000035722212,0.017707279,0.00029825987,0.000018631892,0.00022006064,0.02410514,0.0006236327,0.00036427987,0.0032445656,0.9532923,0.000071093615],"about_ca_topic_score_codex":0.9304726,"about_ca_topic_score_gemma":0.972829,"teacher_disagreement_score":0.06952739,"about_ca_system_score_codex":0.047441233,"about_ca_system_score_gemma":0.26135042,"threshold_uncertainty_score":0.34421182},"labels":[],"label_agreement":null},{"id":"W7001552762","doi":"","title":"Lâinfluence de la coopÃ©ration patronale-syndicale sur le fonctionnement et le degrÃ© dâautonomie des Ã©quipes de travail","year":2010,"lang":"fr","type":"other","venue":"Library and Archives Canada (Government of Canada)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Nucleofection; Fusible alloy; Limiting; Demotion","score_opus":0.0023282994327802455,"score_gpt":0.13217972361939234,"score_spread":0.1298514241866121,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7001552762","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8977441,0.003609575,0.009337464,0.0029374827,0.00016495386,0.00009229392,0.0009446427,0.000085473264,0.08508414],"genre_scores_gemma":[0.980048,0.0012770019,0.0025921215,0.00023243934,0.000071730145,0.000099724675,0.00041766447,0.00004795258,0.01521332],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99499005,0.0019706804,0.00025426914,0.0010223745,0.0012546612,0.0005078997],"domain_scores_gemma":[0.97384137,0.016604505,0.003622725,0.0016873043,0.0031304643,0.0011135471],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0047297874,0.00063869666,0.0005386026,0.0012847045,0.0015713231,0.006055136,0.00069851085,0.0009296201,0.025006672],"category_scores_gemma":[0.018280629,0.0004271955,0.0013199659,0.0021090866,0.0020021456,0.0033016282,0.0029882437,0.0017175605,0.0019164106],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00075697806,0.00023776626,0.689017,0.0018944496,0.00095485843,0.0011199287,0.06311369,0.002522766,0.008614667,0.049580265,0.004241268,0.17794637],"study_design_scores_gemma":[0.000024533649,0.00029139558,0.8929679,0.00062357984,0.00033173282,0.00050942134,0.029760495,0.0019683999,0.0023376865,0.010501076,0.06058577,0.00009815153],"about_ca_topic_score_codex":0.016896456,"about_ca_topic_score_gemma":0.019587558,"teacher_disagreement_score":0.025006672,"about_ca_system_score_codex":0.0029896975,"about_ca_system_score_gemma":0.003499848,"threshold_uncertainty_score":0.083655655},"labels":[],"label_agreement":null},{"id":"W7007882298","doi":"","title":"Analyzing the defensibility of visual simulations through post construction appraisal for Dundas Square and HtO Park","year":2009,"lang":"en","type":"dissertation","venue":"The Atrium (University of Guelph)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Reliability (semiconductor); Set (abstract data type); Process (computing); Square (algebra); Visual inspection; Validity","score_opus":0.010661752324048887,"score_gpt":0.247103159407349,"score_spread":0.2364414070833001,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7007882298","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98905224,0.000040426734,0.0014093802,0.00019646477,0.000014261587,0.0002228574,0.000044039858,0.000013361475,0.0090069035],"genre_scores_gemma":[0.99473107,0.00007005203,0.0028792387,0.000016915608,0.0000053983463,0.00016297825,0.000074404765,0.000013461409,0.0020464326],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9777359,0.012234111,0.0009112799,0.0007279866,0.007497625,0.00089322514],"domain_scores_gemma":[0.86039555,0.08392858,0.0094700605,0.0057671685,0.03846791,0.00197073],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0347266,0.0003547658,0.00038457155,0.0024780156,0.002312296,0.0035759283,0.0012209883,0.00049608725,0.002430351],"category_scores_gemma":[0.11054003,0.0003966149,0.00028150054,0.0017621497,0.003286941,0.0014677325,0.0021722254,0.0009942974,0.00035154296],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016369695,0.0011143718,0.20608082,0.0006959256,0.00005700609,0.0016224888,0.5034342,0.003528901,0.008761185,0.008238775,0.003845914,0.26098344],"study_design_scores_gemma":[0.00012530657,0.003441529,0.5111242,0.0006457749,0.00010386428,0.00040250362,0.42194948,0.010040223,0.014375651,0.0031347598,0.034501594,0.00015513222],"about_ca_topic_score_codex":0.010499653,"about_ca_topic_score_gemma":0.031994257,"teacher_disagreement_score":0.98950034,"about_ca_system_score_codex":0.0062854355,"about_ca_system_score_gemma":0.0049410933,"threshold_uncertainty_score":0.18365401},"labels":[],"label_agreement":null},{"id":"W7008183742","doi":"","title":"BIM Standards Around The World A Review of BIM Standards in the Global AEC Industry and BIM Roles of Project Stakeholders","year":2019,"lang":"en","type":"article","venue":"Global Science & Technology Forum Journal of Engineering Technology (Global Science & Technology Forum)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Construction industry; Project stakeholder; Stakeholder; Project management","score_opus":0.009405521714982117,"score_gpt":0.27084287549680003,"score_spread":0.2614373537818179,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008183742","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020760544,0.757427,0.05203868,0.019066999,0.003962527,0.00015604091,0.0011404951,0.0007197665,0.14472799],"genre_scores_gemma":[0.11702523,0.8048998,0.058691125,0.0041900515,0.0010440337,0.00025043573,0.0025086994,0.0004389168,0.010951647],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9901731,0.0026795445,0.0015917185,0.00062822254,0.004607655,0.00031982383],"domain_scores_gemma":[0.98382527,0.0066807624,0.0019604634,0.000983954,0.006153981,0.0003955155],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010263224,0.0006988538,0.000700383,0.011735285,0.0010850457,0.0045047156,0.0014853687,0.0013669729,0.0038257937],"category_scores_gemma":[0.0142313065,0.00047452893,0.00046943338,0.020109607,0.002038206,0.0064573498,0.002179202,0.0013567468,0.0011881324],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000045602883,0.00005750013,0.002119893,0.0070291213,0.000043314227,0.00017810374,0.0019349599,0.0028747243,0.0012254681,0.09338771,0.043908183,0.8471955],"study_design_scores_gemma":[0.000002819982,0.000028981565,0.0036406103,0.0065697404,0.00003749374,0.00047354173,0.0015748381,0.00047916707,0.0009979636,0.008654159,0.97751355,0.0000270862],"about_ca_topic_score_codex":0.004364014,"about_ca_topic_score_gemma":0.0046741916,"teacher_disagreement_score":0.011735285,"about_ca_system_score_codex":0.0031174882,"about_ca_system_score_gemma":0.007235369,"threshold_uncertainty_score":0.054277718},"labels":[],"label_agreement":null},{"id":"W7008245790","doi":"","title":"BIM Integrated Bid Proposal Evaluation Tool to Aid Sustainable Procurement of Water supply infrastructure projects","year":2022,"lang":"en","type":"dissertation","venue":"Scholarship at UWindsor (University of Windsor)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Procurement; Sustainability; Water supply; Standardization; Production (economics)","score_opus":0.008123277887187605,"score_gpt":0.21489478155318512,"score_spread":0.2067715036659975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008245790","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.11260204,0.00071200106,0.7451781,0.0017006479,0.00029106587,0.004425112,0.013788746,0.0227009,0.098601446],"genre_scores_gemma":[0.34310699,0.00060818915,0.6317751,0.00023327541,0.000031762458,0.0027558962,0.00990677,0.00069321785,0.010888779],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9912423,0.0036996393,0.0008880341,0.0005066855,0.0032368384,0.0004266356],"domain_scores_gemma":[0.9844428,0.006820771,0.0015001376,0.001038783,0.0056692,0.00052837055],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01436089,0.001060655,0.0006730256,0.008269486,0.0008008307,0.0033249583,0.0017624375,0.0008974188,0.010985358],"category_scores_gemma":[0.027691703,0.0006667109,0.001146099,0.0042879963,0.00040564899,0.0039393064,0.0028266408,0.0010358769,0.0024744738],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0007689371,0.001113133,0.025184404,0.0025080282,0.000236311,0.00075234676,0.0031535309,0.11399781,0.00728271,0.055571526,0.057292838,0.73213845],"study_design_scores_gemma":[0.00030073064,0.000570456,0.02158088,0.0011338852,0.00032527122,0.00043568877,0.003965013,0.7256192,0.021016378,0.03337083,0.1912908,0.00039089096],"about_ca_topic_score_codex":0.009991755,"about_ca_topic_score_gemma":0.018182298,"teacher_disagreement_score":0.01436089,"about_ca_system_score_codex":0.0025542134,"about_ca_system_score_gemma":0.005715747,"threshold_uncertainty_score":0.07594854},"labels":[],"label_agreement":null},{"id":"W7008251265","doi":"","title":"BSI 2011/2012 - Building Information Modeling (BIM)","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information system; Information model; Domain (mathematical analysis); Identification (biology); Key (lock); Field (mathematics)","score_opus":0.01814070332592309,"score_gpt":0.19027007113972508,"score_spread":0.17212936781380198,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7008251265","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.03159701,0.011785786,0.1638183,0.01747851,0.0077502327,0.0029335462,0.11236625,0.013036085,0.63923424],"genre_scores_gemma":[0.075191885,0.006041668,0.1196788,0.0019404145,0.0008760008,0.001490912,0.21541248,0.00850943,0.57085836],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9921583,0.0012878495,0.0005400949,0.0005408616,0.0045308424,0.0009421093],"domain_scores_gemma":[0.98549646,0.0011235347,0.0006914877,0.001857703,0.009592544,0.0012383222],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010276165,0.0025990335,0.0018349664,0.005580936,0.0026664496,0.0073015266,0.0045015626,0.005291768,0.064012215],"category_scores_gemma":[0.013438417,0.0015931383,0.0014177191,0.0060007786,0.0011728962,0.0033679774,0.004336193,0.0042506494,0.042501017],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010158949,0.0011127074,0.0029594258,0.0015328572,0.0001386701,0.0006184025,0.00083373237,0.01238358,0.030532502,0.08553814,0.66344446,0.19988966],"study_design_scores_gemma":[0.00006955,0.00012370836,0.005755166,0.0003235262,0.0000354127,0.00022384546,0.00017725138,0.004709349,0.013450448,0.0026435957,0.9724087,0.00007952265],"about_ca_topic_score_codex":0.21910457,"about_ca_topic_score_gemma":0.13258949,"teacher_disagreement_score":0.21910457,"about_ca_system_score_codex":0.009997559,"about_ca_system_score_gemma":0.020729562,"threshold_uncertainty_score":0.4356585},"labels":[],"label_agreement":null},{"id":"W7009710678","doi":"","title":"The facts and fallacies about BIM","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Building information modeling; Presentation (obstetrics); Process (computing); Focus (optics); Information model; Information technology; Industry 4.0","score_opus":0.013751482132371044,"score_gpt":0.18457493144804724,"score_spread":0.1708234493156762,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7009710678","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014535027,0.11157958,0.03078424,0.70067525,0.008857795,0.000041576743,0.00029502437,0.00022403178,0.13300751],"genre_scores_gemma":[0.6316838,0.16610378,0.04631392,0.113055125,0.026469817,0.00031634982,0.0004265921,0.00043859208,0.015192009],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.97651744,0.013577053,0.001137137,0.0020183327,0.00605702,0.00069307844],"domain_scores_gemma":[0.96342653,0.029056635,0.0013884809,0.0025998414,0.002876903,0.000651615],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.026674425,0.00067661074,0.0010796393,0.004348749,0.007459182,0.016717348,0.0020532296,0.0075734304,0.0040717986],"category_scores_gemma":[0.03828782,0.00088745187,0.0006712433,0.0055922824,0.051504064,0.034224782,0.007032293,0.019861903,0.0014202029],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026412497,0.000015836371,0.00040090157,0.00027313744,0.000010747848,0.00013090987,0.006019136,0.00054798555,0.00008105497,0.9331774,0.02567914,0.03363727],"study_design_scores_gemma":[0.000008113063,0.000019271438,0.00041822196,0.0010764599,0.000009890499,0.00039067486,0.007018403,0.0006847745,0.00017026238,0.6726317,0.31754118,0.0000311689],"about_ca_topic_score_codex":0.0033107987,"about_ca_topic_score_gemma":0.0025212693,"teacher_disagreement_score":0.026674425,"about_ca_system_score_codex":0.004940823,"about_ca_system_score_gemma":0.0027707906,"threshold_uncertainty_score":0.14106947},"labels":[],"label_agreement":null},{"id":"W7014885741","doi":"","title":"Research viewpoints by IRC : collaboration is key to advancing construction innovation","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Viewpoints; Key (lock); Industry 4.0; Construction industry; Technology forecasting","score_opus":0.014342521475577318,"score_gpt":0.2804518631942522,"score_spread":0.2661093417186749,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7014885741","genre_codex":"commentary","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":"commentary","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029582274,0.014492863,0.0098440945,0.8114114,0.011693239,0.00008733244,0.00009763975,0.00019493017,0.14922035],"genre_scores_gemma":[0.369709,0.07678505,0.03539579,0.3187828,0.022451758,0.00073682744,0.0005431499,0.0009047813,0.1746908],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9616484,0.017947262,0.001641245,0.0045603923,0.011444447,0.002758197],"domain_scores_gemma":[0.92883015,0.021609336,0.0032033788,0.0059290463,0.03205093,0.008377075],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.027221119,0.0009861487,0.0011366865,0.0037794616,0.010451614,0.028020868,0.0028010148,0.0120369205,0.026209703],"category_scores_gemma":[0.040827077,0.0005090054,0.00092606933,0.00664004,0.014751071,0.030552693,0.011730114,0.020157978,0.008579656],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000053630592,0.00010869174,0.001691769,0.0010152555,0.000040093557,0.0002656847,0.022297047,0.0002706709,0.000998734,0.41415074,0.437772,0.12133575],"study_design_scores_gemma":[0.000024301047,0.0000375427,0.00096685806,0.0017239487,0.000035173514,0.00036150613,0.026880603,0.0004207042,0.00065267,0.107103705,0.8617477,0.00004528583],"about_ca_topic_score_codex":0.009220724,"about_ca_topic_score_gemma":0.008127991,"teacher_disagreement_score":0.028020868,"about_ca_system_score_codex":0.013916971,"about_ca_system_score_gemma":0.03581203,"threshold_uncertainty_score":0.14396071},"labels":[],"label_agreement":null},{"id":"W7015679255","doi":"","title":"Understanding BIM and value it brings - Invited presentation","year":2011,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Presentation (obstetrics); Reuse; Value (mathematics); Session (web analytics); Focus (optics); Building information modeling","score_opus":0.07415348846484052,"score_gpt":0.22596490556486426,"score_spread":0.15181141710002374,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015679255","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.014701189,0.024056213,0.035169255,0.3698962,0.009412959,0.00007187508,0.00018469585,0.00025533524,0.5462522],"genre_scores_gemma":[0.623082,0.050299127,0.02267289,0.038999233,0.005839374,0.00027046865,0.0005924284,0.00051917223,0.25772536],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979545,0.000957726,0.00004447865,0.00017313729,0.00064403925,0.000226059],"domain_scores_gemma":[0.9981558,0.0010191493,0.00007011666,0.00013236687,0.0004114089,0.00021113368],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0035607882,0.0006303783,0.00044801697,0.0013201928,0.0042277635,0.017012442,0.0009733291,0.003985161,0.01926483],"category_scores_gemma":[0.0066344687,0.00046150817,0.00045822398,0.0020843777,0.007045298,0.01748662,0.006305694,0.005006107,0.0029638445],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000023739565,0.00002361195,0.00035081845,0.00015598728,0.000008215268,0.00028166533,0.015274201,0.0003551632,0.0003234984,0.85200864,0.07712898,0.054065548],"study_design_scores_gemma":[0.0000038567086,0.000013029285,0.0003489281,0.00042268648,0.0000074296067,0.00020443721,0.012834707,0.00056013203,0.0002950581,0.2804279,0.704868,0.000013823213],"about_ca_topic_score_codex":0.0025263894,"about_ca_topic_score_gemma":0.0035098405,"teacher_disagreement_score":0.01926483,"about_ca_system_score_codex":0.004884956,"about_ca_system_score_gemma":0.0026637665,"threshold_uncertainty_score":0.064447224},"labels":[],"label_agreement":null},{"id":"W7015852235","doi":"","title":"Update on Projects at the Canadian Centre for Housing Technology","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Product (mathematics); Information technology; New product development; Test (biology); Research centre","score_opus":0.006627505477034835,"score_gpt":0.19367116842083584,"score_spread":0.187043662943801,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7015852235","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.008238262,0.039237577,0.01544951,0.0285505,0.051464982,0.0025277894,0.07148634,0.005094431,0.7779505],"genre_scores_gemma":[0.027088912,0.0463577,0.042954385,0.005038693,0.005018829,0.0010649232,0.09760054,0.0015705185,0.77330554],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9872693,0.00029269507,0.00040104464,0.00025429134,0.011185427,0.00059719867],"domain_scores_gemma":[0.9640189,0.00065322145,0.0004800867,0.001261677,0.032081366,0.0015046232],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.005181851,0.0015926629,0.0008271293,0.014330745,0.0030892189,0.003707251,0.0029105712,0.0019805063,0.05724362],"category_scores_gemma":[0.011375654,0.00064223545,0.00086415606,0.015560636,0.0008289653,0.0026709728,0.0020029405,0.0019796528,0.023370406],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000024078032,0.000052040054,0.00079784857,0.00026039415,0.000004642705,0.00007599715,0.00012008492,0.00018124226,0.00034837064,0.0011555698,0.8727006,0.124279246],"study_design_scores_gemma":[0.0000031095224,0.000008756857,0.0026198921,0.000107975466,0.0000052719656,0.00004223761,0.00005639934,0.000045786488,0.00016098747,0.000081937236,0.99685633,0.000011261766],"about_ca_topic_score_codex":0.790489,"about_ca_topic_score_gemma":0.8860873,"teacher_disagreement_score":0.20951098,"about_ca_system_score_codex":0.013617416,"about_ca_system_score_gemma":0.049715262,"threshold_uncertainty_score":0.42148966},"labels":[],"label_agreement":null},{"id":"W7020101737","doi":"","title":"Invited Presentation - BIM, what, why and how?","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"","score_opus":0.007134138118664521,"score_gpt":0.20021335041951535,"score_spread":0.19307921230085084,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7020101737","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0042613177,0.0047141435,0.002308207,0.29402414,0.58321935,0.000667828,0.00083696493,0.0005693453,0.10939871],"genre_scores_gemma":[0.030511133,0.0045711244,0.0024529204,0.084348306,0.15191944,0.0005769924,0.001393964,0.0006309695,0.72359514],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9929773,0.0014732357,0.0004344179,0.00070226094,0.0037057388,0.00070697546],"domain_scores_gemma":[0.95428455,0.0034382718,0.00080188585,0.0013542934,0.033909682,0.0062112343],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0068896185,0.0008496447,0.0011032163,0.0011800786,0.004680392,0.0067331293,0.0018530868,0.010778063,0.14534202],"category_scores_gemma":[0.032676622,0.0004524543,0.00091092923,0.0006353977,0.0011708495,0.004216605,0.004087041,0.0058486965,0.05964868],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000781351,0.000033590044,0.00020318509,0.00018020216,0.0000054275984,0.00015017734,0.00011907455,0.000030373292,0.00067038427,0.0010014917,0.9846281,0.012899955],"study_design_scores_gemma":[0.000032550295,0.00005017664,0.0011004459,0.00023118993,0.000013459191,0.00015699213,0.0005987333,0.00020024752,0.0005413199,0.0013067097,0.995742,0.000026028742],"about_ca_topic_score_codex":0.0015748416,"about_ca_topic_score_gemma":0.0045993095,"teacher_disagreement_score":0.14534202,"about_ca_system_score_codex":0.0022223822,"about_ca_system_score_gemma":0.0051899245,"threshold_uncertainty_score":0.4862175},"labels":[],"label_agreement":null},{"id":"W7024525025","doi":"","title":"RSB 2011-2012 - Modélisation de l'information du bâtiment (BIM)","year":2011,"lang":"fr","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information system; Identification (biology); Set (abstract data type); Field (mathematics); Focus (optics)","score_opus":0.014161291890136214,"score_gpt":0.18867926816691513,"score_spread":0.17451797627677892,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7024525025","genre_codex":"other","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00986564,0.005991205,0.31956622,0.007905672,0.0050246357,0.0014619443,0.14604042,0.025427926,0.4787163],"genre_scores_gemma":[0.041067537,0.0044010496,0.21644333,0.001116297,0.00066268595,0.0017386838,0.2920108,0.016568698,0.42599082],"study_design_codex":"not_applicable","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99383223,0.0014053899,0.0005239977,0.00047991867,0.0033970582,0.00036143514],"domain_scores_gemma":[0.9950197,0.0010632324,0.0002451318,0.0008412376,0.0025478,0.00028287838],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006426683,0.0019310528,0.0020298073,0.003960622,0.0016256549,0.0069524813,0.0037582119,0.003944322,0.08912966],"category_scores_gemma":[0.009976328,0.0017699711,0.0017335833,0.0040145046,0.0011245989,0.004249858,0.002887676,0.0053495443,0.05499436],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00053123734,0.00035971327,0.0010017464,0.0014879744,0.00007254699,0.00035445488,0.0008129105,0.021205353,0.008012369,0.14198084,0.6675731,0.15660776],"study_design_scores_gemma":[0.00006971498,0.00005266751,0.0018295818,0.00039145874,0.000021739774,0.0001876154,0.00014084965,0.011139718,0.007092277,0.005400698,0.973583,0.00009066269],"about_ca_topic_score_codex":0.123983055,"about_ca_topic_score_gemma":0.06758592,"teacher_disagreement_score":0.123983055,"about_ca_system_score_codex":0.0066539664,"about_ca_system_score_gemma":0.009657589,"threshold_uncertainty_score":0.29816842},"labels":[],"label_agreement":null},{"id":"W7030439585","doi":"","title":"NRC-CCCT in London hosts building information modeling (BIM) experts","year":2010,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Information model; Information system; Key (lock); Information technology; Set (abstract data type)","score_opus":0.005809089103762306,"score_gpt":0.19941148242343099,"score_spread":0.1936023933196687,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030439585","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02093888,0.0029527731,0.01230382,0.038686797,0.009969835,0.00063084706,0.01540487,0.005156711,0.89395547],"genre_scores_gemma":[0.01573156,0.00027969654,0.003235906,0.0007348663,0.00017549611,0.000083365616,0.0019171011,0.000723386,0.9771186],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9942491,0.00059640204,0.00024414092,0.0009892724,0.0029612826,0.0009597067],"domain_scores_gemma":[0.98776066,0.0011640511,0.00070954097,0.0010213449,0.006612962,0.0027314262],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0032705504,0.0013648818,0.0011634191,0.0026990601,0.0062892884,0.006845755,0.001981058,0.006249152,0.33110732],"category_scores_gemma":[0.0061589666,0.001201968,0.00088043086,0.002581885,0.0017011137,0.0024949673,0.0029527983,0.0030355828,0.09544946],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003564328,0.00011629001,0.0031429764,0.00034560412,0.000024915553,0.0016964014,0.0006969776,0.001157668,0.007907034,0.018573914,0.9165375,0.04944437],"study_design_scores_gemma":[0.000013613311,0.000023745592,0.0012799954,0.000029668745,0.00000319088,0.000118111006,0.00019200674,0.0003837142,0.00084594154,0.00016327991,0.99692875,0.000017904089],"about_ca_topic_score_codex":0.21449532,"about_ca_topic_score_gemma":0.4877088,"teacher_disagreement_score":0.33110732,"about_ca_system_score_codex":0.014729319,"about_ca_system_score_gemma":0.024561819,"threshold_uncertainty_score":0.95409423},"labels":[],"label_agreement":null},{"id":"W7030592696","doi":"","title":"New and improved NRC web site delivers solutions to construction practitioners","year":2004,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Web site; Key (lock); The Internet; Web application","score_opus":0.006706308558977343,"score_gpt":0.19370343503466672,"score_spread":0.1869971264756894,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7030592696","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035330523,0.0007652335,0.029011818,0.033565845,0.012569975,0.0017687564,0.0036948663,0.023928395,0.85936457],"genre_scores_gemma":[0.03395825,0.00043690592,0.035734557,0.0027663184,0.0018030426,0.0003267252,0.00378513,0.0032717546,0.91791725],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9880905,0.001792783,0.00038344954,0.0005023395,0.00870211,0.0005288808],"domain_scores_gemma":[0.9430339,0.004898593,0.0007881942,0.0047000186,0.04306808,0.0035112563],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.010032653,0.00057584886,0.000839346,0.0036377993,0.0024903517,0.0048373505,0.0019051498,0.0042234175,0.4069875],"category_scores_gemma":[0.023811452,0.00052477815,0.00050811534,0.0020489418,0.0009250979,0.0037147421,0.0021635508,0.0020229917,0.20157805],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009003669,0.0005583837,0.0012238026,0.00017652621,0.000004924806,0.00019026115,0.0003351323,0.00024864788,0.004982925,0.0017479014,0.7704282,0.22001329],"study_design_scores_gemma":[0.000097844066,0.00017551336,0.005895535,0.0001105804,0.0000144930045,0.00027251267,0.0004937488,0.0028311983,0.00404857,0.0010149122,0.98497194,0.00007315697],"about_ca_topic_score_codex":0.0072654877,"about_ca_topic_score_gemma":0.02759499,"teacher_disagreement_score":0.4069875,"about_ca_system_score_codex":0.0022948333,"about_ca_system_score_gemma":0.008022776,"threshold_uncertainty_score":0.84586036},"labels":[],"label_agreement":null},{"id":"W7038520686","doi":"","title":"IRC web site offers solutions for the construction industry","year":2003,"lang":"en","type":"article","venue":"NPARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Web site; Construction industry; Construction management; Key (lock); Industry 4.0","score_opus":0.016083445250412946,"score_gpt":0.2081804676195565,"score_spread":0.19209702236914356,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7038520686","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013619559,0.00040854036,0.016421605,0.0021001836,0.0009972618,0.0001989998,0.00547605,0.02141087,0.9516245],"genre_scores_gemma":[0.004678661,0.00036676766,0.01675893,0.00046646464,0.00013933535,0.00015116142,0.0096767405,0.0029857724,0.96477616],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99833655,0.00013102662,0.000034996672,0.0001273478,0.00122642,0.00014361503],"domain_scores_gemma":[0.9976325,0.00029449668,0.00005657329,0.0005263562,0.0011300661,0.0003599311],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0014407708,0.00082503783,0.00084353844,0.0025905801,0.002249195,0.003907144,0.0019863925,0.003062836,0.6400114],"category_scores_gemma":[0.0027062949,0.00086047826,0.00080817984,0.003291421,0.00055060344,0.002463176,0.002292004,0.0022854088,0.5043278],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000055697867,0.00014500206,0.00012197783,0.00009524761,0.0000038555017,0.000040903768,0.000043595766,0.0001410165,0.001208761,0.0060948567,0.8865035,0.105545454],"study_design_scores_gemma":[0.00003423372,0.00002497113,0.00038919912,0.000026033556,0.0000053206063,0.00005492902,0.000044632197,0.00096733036,0.00088042463,0.0016007561,0.99595755,0.000014527229],"about_ca_topic_score_codex":0.0069380007,"about_ca_topic_score_gemma":0.013774479,"teacher_disagreement_score":0.6400114,"about_ca_system_score_codex":0.0015134023,"about_ca_system_score_gemma":0.0029327618,"threshold_uncertainty_score":0.51347995},"labels":[],"label_agreement":null},{"id":"W7042431196","doi":"","title":"An Ontological Study on the State of the Turkish Construction Industry and its Implementation of Building Information Modeling (BIM)","year":2020,"lang":"en","type":"dissertation","venue":"Eastern Mediterranean University Institutional Repository (Eastern Mediterranean University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Turkish; Building information modeling; Construction industry; Work (physics); State (computer science); Information technology","score_opus":0.024331747341255844,"score_gpt":0.22913726858753952,"score_spread":0.20480552124628368,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7042431196","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8857853,0.0007099549,0.011597496,0.0020770235,0.000046051235,0.00008471063,0.00025208222,0.000029948565,0.099417515],"genre_scores_gemma":[0.99658597,0.00030915553,0.0015904162,0.000054799333,0.0000050854305,0.00004239187,0.00016498707,0.000005376215,0.00124167],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.9977106,0.001048062,0.00021145029,0.00021394789,0.00046564537,0.00035028992],"domain_scores_gemma":[0.99736136,0.0011855756,0.00044893046,0.00022073826,0.0006513766,0.00013196807],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0030516451,0.00022192807,0.00016520276,0.004901655,0.0026952585,0.0044006705,0.0005550526,0.000704729,0.001492465],"category_scores_gemma":[0.004245224,0.0001837681,0.0003123075,0.0066914377,0.005194213,0.004562714,0.0025541964,0.0008630419,0.00018611588],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013969566,0.00023154748,0.052552223,0.00043433585,0.000024395526,0.0010999051,0.2911103,0.0021625962,0.0035056032,0.5492178,0.0026830244,0.09683845],"study_design_scores_gemma":[0.000010006612,0.000120912526,0.11063357,0.00077639223,0.000084938656,0.00067211204,0.71155155,0.008393389,0.0030220551,0.03673016,0.12791404,0.00009090567],"about_ca_topic_score_codex":0.022684904,"about_ca_topic_score_gemma":0.017972773,"teacher_disagreement_score":0.022684904,"about_ca_system_score_codex":0.006661257,"about_ca_system_score_gemma":0.004817016,"threshold_uncertainty_score":0.048330963},"labels":[],"label_agreement":null},{"id":"W7071148070","doi":"","title":"Season 11 Episode 02 - Pow Wow Circle","year":2002,"lang":"en","type":"other","venue":"Connecting Canadians: Canada’s Multicultural Newspapers Beta Website (Athabasca University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Popularity; Phenomenon","score_opus":0.005800524517996833,"score_gpt":0.15706613841510186,"score_spread":0.15126561389710502,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7071148070","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012276842,0.00021739402,0.00026575892,0.006854023,0.0021365236,0.00042436333,0.012695546,0.000331596,0.96479803],"genre_scores_gemma":[0.024481725,0.00018841238,0.00014431715,0.0023682313,0.00021153106,0.0002705147,0.0052107475,0.00024075957,0.9668838],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.998961,0.00006454834,0.000023893479,0.00010291998,0.00033352152,0.0005140025],"domain_scores_gemma":[0.9985038,0.000065581524,0.00004343376,0.000088844834,0.0005035289,0.00079487526],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00076061627,0.00048677594,0.0004163363,0.0009575269,0.014933767,0.0067927144,0.001118501,0.0029389858,0.27059594],"category_scores_gemma":[0.0020286022,0.00046205622,0.00032466886,0.0017966101,0.0007289786,0.0024343957,0.003804778,0.003469373,0.07085356],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00006391654,0.000068887646,0.0011510217,0.000050793547,0.0000017630542,0.00021833129,0.0034112514,0.0000101677715,0.00011504603,0.0034611428,0.9821547,0.009292833],"study_design_scores_gemma":[0.000006951769,0.000009039231,0.004759095,0.000040284493,7.618961e-7,0.000034859368,0.00643102,0.000011379322,0.00008408092,0.00018825539,0.98842806,0.0000061815044],"about_ca_topic_score_codex":0.36162674,"about_ca_topic_score_gemma":0.743491,"teacher_disagreement_score":0.63837326,"about_ca_system_score_codex":0.005726173,"about_ca_system_score_gemma":0.008831375,"threshold_uncertainty_score":0.9052336},"labels":[],"label_agreement":null},{"id":"W7082632266","doi":"10.1109/comst.2025.3612388","title":"Integrated Sensing, Communication, and Computation for IoV: Challenges and Opportunities","year":2025,"lang":"en","type":"article","venue":"IEEE Communications Surveys & Tutorials","topic":"BIM and Construction Integration","field":"Engineering","cited_by":10,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Carleton University","funders":"Science and Technology Innovation Foundation of Harbin; National Natural Science Foundation of China","keywords":"Bottleneck; Redundancy (engineering); Computation; Resource (disambiguation); System integration; Data integration; Service (business); Automation","score_opus":0.10264569411492841,"score_gpt":0.3048827889188718,"score_spread":0.20223709480394342,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7082632266","genre_codex":"methods","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019790638,0.38690993,0.39440152,0.043883465,0.0028414757,0.00021707892,0.0002305886,0.0005772285,0.15114807],"genre_scores_gemma":[0.36357832,0.43536,0.17545132,0.004864815,0.0036745796,0.00036378962,0.000528279,0.0002998774,0.015879028],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.99854654,0.00039325125,0.0001004377,0.0002063865,0.0005643103,0.00018893214],"domain_scores_gemma":[0.99834895,0.0007524948,0.000090173504,0.0001785502,0.00051669945,0.00011308912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0023260887,0.00062723766,0.00047893668,0.0016352105,0.0010941817,0.0054195593,0.0018381621,0.0023625214,0.0026578116],"category_scores_gemma":[0.0025293615,0.0004337152,0.0006188644,0.001871538,0.0029463589,0.009799794,0.003241195,0.003558628,0.0009232312],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019022016,0.000036315738,0.0010904467,0.0011591455,0.000019430165,0.00010424174,0.00050220045,0.0058396445,0.0018141946,0.80289805,0.0075492207,0.17896809],"study_design_scores_gemma":[0.0000065026716,0.00012991387,0.00086707965,0.0016188709,0.000033294204,0.00060759793,0.0016798167,0.03193438,0.0027463515,0.45711535,0.5031933,0.000067492845],"about_ca_topic_score_codex":0.0023885237,"about_ca_topic_score_gemma":0.002633031,"teacher_disagreement_score":0.0054195593,"about_ca_system_score_codex":0.0021827985,"about_ca_system_score_gemma":0.0036822578,"threshold_uncertainty_score":0.015837371},"labels":[],"label_agreement":null},{"id":"W7093306288","doi":"10.1016/j.autcon.2025.106618","title":"Integrated framework of computer vision and fuzzy systems for lean workspace management in construction","year":2025,"lang":"en","type":"article","venue":"Automation in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Workspace; Dashboard; Workflow; Fuzzy logic; Index (typography); Fuzzy control system; Workflow management system; Inference engine","score_opus":0.005108952100332462,"score_gpt":0.23166076692432028,"score_spread":0.2265518148239878,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7093306288","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0028630598,0.00024238482,0.99233127,0.00016304823,0.00002946536,0.00005793042,0.000033247106,0.00027800316,0.0040016277],"genre_scores_gemma":[0.27684897,0.00058951497,0.7185237,0.00015667049,0.00006500959,0.00031601443,0.00013840674,0.00005295823,0.0033087656],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9991285,0.0002292607,0.000060523147,0.00019204745,0.0003345839,0.00005515001],"domain_scores_gemma":[0.99933845,0.00025260155,0.000068709785,0.000054327895,0.00025482615,0.00003105913],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013988194,0.0007360426,0.00050331134,0.0014853065,0.0006628559,0.001976659,0.0013232423,0.0009264678,0.002349841],"category_scores_gemma":[0.0019838372,0.00029718876,0.0011321192,0.00079447223,0.0010334532,0.0013878015,0.0010536114,0.0010562309,0.00055522955],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000118680706,0.00016946484,0.0024160682,0.00036875514,0.00013404622,0.00034241102,0.0006503386,0.4704766,0.014875721,0.24565122,0.0031642122,0.2616325],"study_design_scores_gemma":[0.000017276034,0.00011284334,0.0008051352,0.000097553435,0.000043202213,0.000109417735,0.00011282043,0.9221283,0.0032768787,0.062792875,0.010459514,0.000044165525],"about_ca_topic_score_codex":0.01552391,"about_ca_topic_score_gemma":0.011580233,"teacher_disagreement_score":0.01552391,"about_ca_system_score_codex":0.0021082077,"about_ca_system_score_gemma":0.0023017216,"threshold_uncertainty_score":0.0308671},"labels":[],"label_agreement":null},{"id":"W7094360872","doi":"","title":"Patientsâ experiences with continuity of cancer care in Canada: Results from the CanIMPACT study","year":2016,"lang":"en","type":"article","venue":"PubMed Central","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Nucleofection; Gestational period; TSG101; Dysgeusia; Liquation; Diafiltration; Emperipolesis; Triacetin; Durvalumab","score_opus":0.006504209827282767,"score_gpt":0.18279159265507047,"score_spread":0.17628738282778772,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7094360872","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.97921056,0.0008733493,0.00007589205,0.00336251,0.000048559144,0.0001961038,0.0012259079,0.00001046509,0.014996693],"genre_scores_gemma":[0.99586594,0.00074124377,0.00024139504,0.0006314748,0.0000059501795,0.000066432025,0.0004230906,0.000008431953,0.0020159897],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99376386,0.0011951549,0.00035207142,0.00031808563,0.0020942125,0.0022766585],"domain_scores_gemma":[0.983788,0.0025043406,0.0020656912,0.00041564275,0.0054786154,0.0057477416],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034998944,0.00023418272,0.00066308596,0.001670026,0.013535778,0.005485813,0.001678618,0.0009312921,0.005218177],"category_scores_gemma":[0.01618363,0.00042328532,0.0005479802,0.0071298927,0.003051294,0.0014217184,0.005183663,0.0020392372,0.00023238263],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00071035407,0.0015384351,0.5894957,0.0005133862,0.00015443999,0.0008947234,0.2973661,0.0003630491,0.00017532933,0.003491567,0.02079821,0.08449867],"study_design_scores_gemma":[0.00007763173,0.00027522442,0.43929058,0.0005901865,0.0001003752,0.00028357195,0.53201914,0.0002276116,0.00014239088,0.00036340157,0.026536072,0.00009383715],"about_ca_topic_score_codex":0.97544086,"about_ca_topic_score_gemma":0.99054456,"teacher_disagreement_score":0.08086232,"about_ca_system_score_codex":0.08086232,"about_ca_system_score_gemma":0.19027904,"threshold_uncertainty_score":0.58669996},"labels":[],"label_agreement":null},{"id":"W7097405481","doi":"","title":"EDITOR: B.C. Björk","year":2003,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Documentation; Compendium; Software; Cover (algebra); Workflow; Information technology","score_opus":0.003970820071504896,"score_gpt":0.1782684283510865,"score_spread":0.1742976082795816,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7097405481","genre_codex":"editorial","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00058298075,0.021024749,0.0008932151,0.13067345,0.77336556,0.00014301094,0.000612452,0.00035634195,0.072348215],"genre_scores_gemma":[0.012214184,0.03574719,0.0019768502,0.08292789,0.3196388,0.00022908814,0.0009820242,0.00056168926,0.54572237],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99859816,0.00023397009,0.00017816674,0.00023731418,0.00061816693,0.00013410924],"domain_scores_gemma":[0.989967,0.0016735964,0.00051631726,0.0003670219,0.006149597,0.0013265874],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.002069885,0.0012938805,0.0012644479,0.0015268043,0.0013882812,0.0040110666,0.001968866,0.0041802544,0.1337287],"category_scores_gemma":[0.013307211,0.00040306308,0.00037406562,0.0010260063,0.00079185556,0.0019566156,0.0010355696,0.0031086153,0.08923871],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000015932263,0.0000051356433,0.00004426667,0.00013233724,0.0000020331076,0.0001015264,0.000021222355,0.000015914922,0.00006815432,0.0002453601,0.97987366,0.019474525],"study_design_scores_gemma":[0.0000041651897,0.00000637678,0.00012903576,0.00014056907,0.000002434135,0.00017481046,0.000050081264,0.00002401972,0.000060581635,0.00012333291,0.99928075,0.0000038865105],"about_ca_topic_score_codex":0.0028783372,"about_ca_topic_score_gemma":0.005452604,"teacher_disagreement_score":0.8662713,"about_ca_system_score_codex":0.000895082,"about_ca_system_score_gemma":0.0023722337,"threshold_uncertainty_score":0.44736707},"labels":[],"label_agreement":null},{"id":"W7098362078","doi":"","title":"Post-secondary Education: Evidence for Canadian 24- to 26-year-olds","year":2015,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Interpretation (philosophy); Social research; Official statistics; Data collection; Center (category theory); Survey data collection","score_opus":0.03151580373683241,"score_gpt":0.2624794121165526,"score_spread":0.23096360837972021,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7098362078","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9267532,0.011589856,0.00030222037,0.0044713737,0.0003374816,0.000113066,0.026569912,0.00003494847,0.029827856],"genre_scores_gemma":[0.98633724,0.003627407,0.00020005609,0.00063283317,0.00004298964,0.000041797688,0.004980612,0.000024823328,0.0041121314],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9952519,0.00025935876,0.0002481843,0.0007734521,0.0016383353,0.0018287133],"domain_scores_gemma":[0.98455554,0.0012144895,0.0027029326,0.0008244186,0.0074259154,0.003276724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034707075,0.0007369502,0.0011336203,0.0053109736,0.006848742,0.0036312859,0.0043389075,0.0014914569,0.011119836],"category_scores_gemma":[0.012345759,0.00070936105,0.0015525107,0.012025504,0.0017505975,0.0013881478,0.002375635,0.0020686304,0.0011390998],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034439846,0.00013805575,0.94875395,0.00034830396,0.00025939674,0.00029889145,0.012276276,0.00008858104,0.00010800547,0.0022594552,0.014395203,0.020729518],"study_design_scores_gemma":[0.00001542693,0.000032194792,0.9849616,0.00034436348,0.00009851079,0.000042209904,0.0074777366,0.000077362434,0.00005059458,0.00015052463,0.0067235897,0.000025759762],"about_ca_topic_score_codex":0.9959694,"about_ca_topic_score_gemma":0.9981159,"teacher_disagreement_score":0.025456605,"about_ca_system_score_codex":0.025456605,"about_ca_system_score_gemma":0.04177451,"threshold_uncertainty_score":0.1847015},"labels":[],"label_agreement":null},{"id":"W7099378011","doi":"","title":"Multi-Level Effects on Behaviour Outcomes in Canadian Children W-01-2E","year":2001,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Government (linguistics); Work (physics); Affect (linguistics); Data collection; Perspective (graphical)","score_opus":0.011168834130534667,"score_gpt":0.22004568435033398,"score_spread":0.20887685021979932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7099378011","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99615484,0.00014403572,0.000047703856,0.00015383535,0.0000118947155,0.000011615629,0.0005862129,0.000015193969,0.0028747756],"genre_scores_gemma":[0.9897311,0.00019430803,0.0002238038,0.000044983753,0.0000043483005,0.000042087435,0.0007299555,0.000020231437,0.009009257],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.99729615,0.00018558734,0.00007509012,0.000353705,0.0009430451,0.001146379],"domain_scores_gemma":[0.99646604,0.00031834614,0.00053992745,0.00013476744,0.0012709653,0.0012700337],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0013648656,0.00074394495,0.0010193533,0.0018443028,0.0035278294,0.002473856,0.0016527661,0.0012685856,0.004654001],"category_scores_gemma":[0.0030621907,0.00048892974,0.0014153502,0.0023045999,0.001457138,0.00059712643,0.001948715,0.0014194809,0.00081307173],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0009196893,0.0011317189,0.9564183,0.00006695455,0.00016083758,0.0011155767,0.01078779,0.00083379506,0.002607999,0.00089060573,0.0030693095,0.021997431],"study_design_scores_gemma":[0.000009712323,0.00014023455,0.99521565,0.000021194493,0.0000317985,0.000045788358,0.003025051,0.00017250593,0.0002083092,0.00008033026,0.0010284133,0.00002100466],"about_ca_topic_score_codex":0.96817166,"about_ca_topic_score_gemma":0.98825735,"teacher_disagreement_score":0.031828344,"about_ca_system_score_codex":0.019733123,"about_ca_system_score_gemma":0.018925933,"threshold_uncertainty_score":0.14317453},"labels":[],"label_agreement":null},{"id":"W7100314761","doi":"","title":"Kensington","year":2005,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Energy (signal processing); Energy cost; Work (physics); Quarter (Canadian coin)","score_opus":0.004795248148528905,"score_gpt":0.1782562215656699,"score_spread":0.17346097341714098,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7100314761","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.00097204314,0.00229835,0.0013895674,0.001224282,0.0004276725,0.000039357066,0.0018604602,0.000904762,0.9908834],"genre_scores_gemma":[0.0009127678,0.0007653681,0.00053686794,0.00021185006,0.000018848577,0.00001468944,0.00049037964,0.00014641308,0.99690264],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9994672,0.00002726331,0.000020092355,0.00022658223,0.0002033518,0.000055460157],"domain_scores_gemma":[0.99942183,0.00009669117,0.000034023364,0.00008995948,0.00021712731,0.00014041968],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.00034798484,0.0017083236,0.00066697906,0.0017406829,0.001684723,0.0038848915,0.00074105663,0.0018280238,0.74628556],"category_scores_gemma":[0.0008097902,0.0007818108,0.00046246225,0.0016399722,0.00054903235,0.0025716263,0.0021012672,0.0019448597,0.580363],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00010350314,0.000085799256,0.0010069438,0.00020730826,0.000009540881,0.00040392185,0.00019507486,0.00033462787,0.0019731459,0.023801524,0.577196,0.39468265],"study_design_scores_gemma":[0.0000070378605,0.000015040701,0.0005969009,0.000066428285,0.000003169527,0.00010027111,0.00005846174,0.000055373323,0.00030199048,0.0009640748,0.99782616,0.000005026606],"about_ca_topic_score_codex":0.0054769106,"about_ca_topic_score_gemma":0.020616772,"teacher_disagreement_score":0.25371444,"about_ca_system_score_codex":0.0010003261,"about_ca_system_score_gemma":0.0012499517,"threshold_uncertainty_score":0},"labels":[],"label_agreement":null},{"id":"W7104272419","doi":"10.71781/1648","title":"Les incidences juridiques du bâti immobilier modélisé au Québec","year":2022,"lang":"fr","type":"dissertation","venue":"Papyrus : Institutional Repository (Université de Montréal)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Economic liberalism; Local government","score_opus":0.00510672063061931,"score_gpt":0.17384884268795053,"score_spread":0.16874212205733122,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7104272419","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.931903,0.0027232557,0.010616906,0.0026645905,0.00014771255,0.00024828876,0.01241496,0.00045003922,0.03883121],"genre_scores_gemma":[0.9684866,0.0014558523,0.0020316152,0.00018519645,0.000017788974,0.00016426909,0.004258076,0.00008990008,0.023310566],"study_design_codex":"observational","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99566275,0.00087862933,0.00025446722,0.00078136136,0.0017709362,0.00065195595],"domain_scores_gemma":[0.98480356,0.0034381212,0.003110042,0.001206134,0.006372477,0.001069741],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0048072357,0.00055465515,0.00088534376,0.004701118,0.0034824314,0.0039397012,0.0016250375,0.0010210596,0.015608459],"category_scores_gemma":[0.016555265,0.0005792243,0.0006603685,0.007342076,0.0017033531,0.0014842588,0.0019084085,0.0017850822,0.0012572543],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005161604,0.000113962975,0.8558984,0.00045272626,0.00027797298,0.0007066281,0.014035276,0.007809674,0.0009061735,0.012071988,0.027579678,0.07963126],"study_design_scores_gemma":[0.000030803298,0.00018002401,0.8932071,0.00068756,0.00018085311,0.00054622226,0.02809073,0.014613312,0.0010117881,0.0018080077,0.059456974,0.0001865897],"about_ca_topic_score_codex":0.9484409,"about_ca_topic_score_gemma":0.96238846,"teacher_disagreement_score":0.05155909,"about_ca_system_score_codex":0.018783363,"about_ca_system_score_gemma":0.019588344,"threshold_uncertainty_score":0.13628346},"labels":[],"label_agreement":null},{"id":"W7105799012","doi":"10.1007/978-3-031-97697-1_13","title":"BIM-Based Configuration System for an Early Design Stage of Modular Residential Projects","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Modular design; Workflow; Product (mathematics); Configuration design; Configuration Management (ITSM); Production (economics); Systems design","score_opus":0.015194841797909876,"score_gpt":0.209051260524775,"score_spread":0.19385641872686513,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105799012","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.034630794,0.00036665297,0.87961274,0.00014849132,0.00019593531,0.00035302006,0.002723698,0.049166027,0.032802664],"genre_scores_gemma":[0.42219064,0.0007020615,0.5379309,0.0001253467,0.000073361545,0.0008287634,0.008469028,0.0027130859,0.026966741],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99931645,0.00015604656,0.000054959903,0.000092030336,0.00033525104,0.000045336976],"domain_scores_gemma":[0.9994209,0.00011386127,0.000032546694,0.00017482997,0.000208829,0.000049082213],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010255749,0.0010235241,0.0007057495,0.002533766,0.00060220715,0.0015679575,0.0015112953,0.000719773,0.023788054],"category_scores_gemma":[0.0014555902,0.00065414555,0.00047165493,0.0018264315,0.00025233993,0.0014031295,0.0015120736,0.0005108446,0.00714472],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00060226844,0.00037229966,0.0052408893,0.00047636838,0.00009122081,0.0006092333,0.00077574485,0.094609,0.037803292,0.01908736,0.060633432,0.77969897],"study_design_scores_gemma":[0.00012920528,0.00029384624,0.0094162095,0.00022499141,0.0001805641,0.0009492211,0.00051739614,0.76703024,0.05176108,0.0126623055,0.1566025,0.0002324001],"about_ca_topic_score_codex":0.0015630435,"about_ca_topic_score_gemma":0.0021955934,"teacher_disagreement_score":0.023788054,"about_ca_system_score_codex":0.0004056109,"about_ca_system_score_gemma":0.00081793906,"threshold_uncertainty_score":0.079578996},"labels":[],"label_agreement":null},{"id":"W7105799806","doi":"10.1007/978-3-031-97697-1_26","title":"Implementing AI to Improve the Efficiency of BIM-Based Construction Schedules","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Schedule; Process (computing); Scheduling (production processes); Building information modeling; Construction management; Project management; System integration","score_opus":0.0042958304751216725,"score_gpt":0.20104121006036377,"score_spread":0.1967453795852421,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105799806","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.01666768,0.00019208748,0.9527703,0.00022007003,0.0001293403,0.00005786685,0.0000975183,0.004220862,0.02564421],"genre_scores_gemma":[0.25370774,0.00026350323,0.7351436,0.000119381104,0.000052248633,0.00007502358,0.00041081486,0.00057997677,0.009647721],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.998855,0.00029790675,0.00006130569,0.00016157198,0.000517481,0.00010675082],"domain_scores_gemma":[0.9979563,0.00086970045,0.00010386011,0.00046864143,0.00053910527,0.00006239168],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012809297,0.00065602415,0.000492778,0.0009847404,0.0005436455,0.0016637872,0.0019025238,0.0006028236,0.009618042],"category_scores_gemma":[0.0042260378,0.00045188342,0.00041376965,0.001684621,0.00048327635,0.001842927,0.0010664617,0.0012015342,0.002491963],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00026367328,0.00034099838,0.0011243555,0.00018038804,0.000038975355,0.000070684306,0.00029729673,0.25610027,0.02783633,0.047748845,0.009655817,0.6563424],"study_design_scores_gemma":[0.00003329117,0.000074215335,0.0006596683,0.000022048987,0.000026080621,0.00005803531,0.000121092395,0.94216526,0.020182827,0.01672655,0.019912262,0.000018716035],"about_ca_topic_score_codex":0.0061654467,"about_ca_topic_score_gemma":0.008400238,"teacher_disagreement_score":0.009618042,"about_ca_system_score_codex":0.0008990809,"about_ca_system_score_gemma":0.0014871329,"threshold_uncertainty_score":0.03217554},"labels":[],"label_agreement":null},{"id":"W7105800120","doi":"10.1007/978-3-031-97697-1_31","title":"A Maturity Model Defining the Synergy Between Digital Twin and Lean Construction to Support Construction Progress Monitoring","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"École de Technologie Supérieure","funders":"","keywords":"Lean construction; Maturity (psychological); Construction industry; Construction management; Capability Maturity Model; Industry 4.0; Lean manufacturing; Bridging (networking)","score_opus":0.007289441501217325,"score_gpt":0.20449020625288655,"score_spread":0.19720076475166923,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105800120","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.017140435,0.00036804704,0.9579242,0.0009662675,0.00005425226,0.00015651951,0.00012175344,0.00048765793,0.022780873],"genre_scores_gemma":[0.40992013,0.00058230787,0.58063406,0.0001887245,0.000037181806,0.00023507155,0.0005598948,0.00011731342,0.0077253394],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9970203,0.0007634026,0.00034832855,0.00041999837,0.0011258443,0.00032209535],"domain_scores_gemma":[0.9959121,0.0013625068,0.00044282043,0.00045860425,0.0014662772,0.0003577074],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045279674,0.00067626906,0.00036149475,0.0022365258,0.0006476565,0.005481996,0.0015906699,0.0018016332,0.0031550871],"category_scores_gemma":[0.00779394,0.0006708052,0.0006337545,0.0022716452,0.001299303,0.009319847,0.003311848,0.0022832048,0.001478428],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009185187,0.00017869573,0.0035345315,0.00017531784,0.000035862264,0.00025966845,0.0012504113,0.035701726,0.0077729705,0.81477684,0.0024602108,0.133762],"study_design_scores_gemma":[0.000030578085,0.00024197275,0.0021980067,0.00034169233,0.00009610473,0.00040813416,0.0011392672,0.51504,0.010502911,0.41781634,0.052102074,0.000082974286],"about_ca_topic_score_codex":0.0038518894,"about_ca_topic_score_gemma":0.0035928322,"teacher_disagreement_score":0.005481996,"about_ca_system_score_codex":0.0023072702,"about_ca_system_score_gemma":0.0032096028,"threshold_uncertainty_score":0.023946464},"labels":[],"label_agreement":null},{"id":"W7105802331","doi":"10.1007/978-3-031-97697-1","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 3","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004611982156835499,"score_gpt":0.1755872255404775,"score_spread":0.170975243383642,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105802331","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0032663387,0.018287033,0.0035272138,0.02547454,0.0635496,0.00019308696,0.00547818,0.0008185924,0.87940544],"genre_scores_gemma":[0.0031370425,0.004299004,0.0008024282,0.0005461658,0.00081881986,0.000023881126,0.0016964109,0.00017236554,0.9885039],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99843436,0.00007915411,0.00002588515,0.00008364679,0.0011629028,0.00021415333],"domain_scores_gemma":[0.9977963,0.000072431816,0.000022904136,0.00005556294,0.001607922,0.0004448496],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015170475,0.0012369403,0.00091183843,0.0020476659,0.0026094785,0.0055937353,0.0013922786,0.0019082869,0.31399986],"category_scores_gemma":[0.0016514818,0.00046288897,0.0005493417,0.0024174626,0.0010613888,0.0014466889,0.0019748688,0.0018537202,0.11341906],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000019245039,0.000020630183,0.000120961704,0.000050151644,0.0000029137107,0.00001827738,0.000025537463,0.000099774225,0.00024732115,0.0012600495,0.9693905,0.02874462],"study_design_scores_gemma":[0.0000033934582,0.000005133443,0.00057660736,0.000039738396,0.0000037518053,0.0000130567905,0.00008606444,0.00013089326,0.00014748336,0.0004444515,0.99854326,0.0000062136114],"about_ca_topic_score_codex":0.42981464,"about_ca_topic_score_gemma":0.70367944,"teacher_disagreement_score":0.57018536,"about_ca_system_score_codex":0.0077946633,"about_ca_system_score_gemma":0.024998693,"threshold_uncertainty_score":0.97849596},"labels":[],"label_agreement":null},{"id":"W7105803252","doi":"10.1007/978-3-031-97697-1_7","title":"Vision-Aided Decision Support Pipeline for Construction-Specific Data Collection Chamber Design","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Pipeline (software); Viewpoints; Excavator; Rendering (computer graphics); Economic shortage; Data collection; Decision support system","score_opus":0.019154214090177837,"score_gpt":0.23569529613499038,"score_spread":0.21654108204481254,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105803252","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.005566386,0.000089020985,0.9836489,0.0000721354,0.000047762787,0.00009933803,0.00033765234,0.0059188334,0.0042198403],"genre_scores_gemma":[0.12308005,0.00018064355,0.86558914,0.00011577227,0.000029217597,0.00014912,0.001783534,0.00048388334,0.008588562],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994578,0.000057930174,0.000027208042,0.00011947963,0.00025929694,0.00007837384],"domain_scores_gemma":[0.9995352,0.00012244807,0.000025790321,0.000071822986,0.00020916465,0.00003567822],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006642039,0.0009926627,0.0008281308,0.001336392,0.00065564545,0.0019410278,0.0017866981,0.0009988624,0.017336791],"category_scores_gemma":[0.0010876465,0.00095890736,0.0007815209,0.0008267751,0.000337588,0.001320037,0.0015175077,0.0008643685,0.0048526325],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004847994,0.00024793646,0.0017037465,0.00029025355,0.000062697596,0.00029226817,0.0002929284,0.08032774,0.13270049,0.010138841,0.026968284,0.74649],"study_design_scores_gemma":[0.000040430496,0.00018809324,0.0017257641,0.000054065156,0.00003987503,0.00021347751,0.00011929625,0.8748035,0.07749592,0.006101136,0.039146565,0.00007187273],"about_ca_topic_score_codex":0.004654381,"about_ca_topic_score_gemma":0.0062441197,"teacher_disagreement_score":0.017336791,"about_ca_system_score_codex":0.00060661085,"about_ca_system_score_gemma":0.0023523835,"threshold_uncertainty_score":0.057997346},"labels":[],"label_agreement":null},{"id":"W7105804095","doi":"10.1007/978-3-031-97697-1_14","title":"BIM-AI-VR Integration for Real-Time Model Update and Visualization","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Manitoba","funders":"","keywords":"Visualization; Python (programming language); Engineering design process; User interface; Building information modeling; Virtual reality; Software; Process (computing); Rendering (computer graphics)","score_opus":0.005936995140064424,"score_gpt":0.2129952994260415,"score_spread":0.20705830428597707,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7105804095","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0013690218,0.00020824376,0.9758469,0.00007499707,0.00019537241,0.000041743908,0.0002455947,0.010948363,0.011069804],"genre_scores_gemma":[0.09468701,0.00080649334,0.8659161,0.0002054577,0.000109248445,0.00023531569,0.0029963607,0.004102603,0.03094152],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999132,0.000091636175,0.00004303339,0.00009461087,0.00058538665,0.000053347023],"domain_scores_gemma":[0.99939704,0.00014485026,0.000024483916,0.00020210292,0.0002002624,0.00003117063],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007194857,0.0012192194,0.0009084131,0.0012412582,0.0004614767,0.002210625,0.0022801417,0.0011689762,0.029683862],"category_scores_gemma":[0.0017761278,0.0010923571,0.0011014049,0.001350594,0.0004646108,0.0018302274,0.00255662,0.0018616928,0.0120337],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00018429832,0.00030674014,0.0005898429,0.0005204943,0.00013225582,0.00038802702,0.0004341372,0.10301945,0.059602514,0.07167669,0.06824834,0.69489723],"study_design_scores_gemma":[0.000040042385,0.000053952852,0.0005314712,0.000075802964,0.000046177065,0.00039860627,0.00008263454,0.8118834,0.03508171,0.017948253,0.13379085,0.00006714387],"about_ca_topic_score_codex":0.0028459136,"about_ca_topic_score_gemma":0.0035906823,"teacher_disagreement_score":0.029683862,"about_ca_system_score_codex":0.0004481022,"about_ca_system_score_gemma":0.00068548514,"threshold_uncertainty_score":0.09930241},"labels":[],"label_agreement":null},{"id":"W7106318135","doi":"10.1007/978-3-032-01078-0_5","title":"In-Plane Strength of a New Self-aligning Bolted Connection for Precast Concrete Wall Panels","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Precast concrete; Connection (principal bundle); Frame (networking); Insert (composites); Bar (unit); Modular design; Bolted joint","score_opus":0.008007098755650411,"score_gpt":0.20064408707640363,"score_spread":0.1926369883207532,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7106318135","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8908038,0.0007854476,0.049067877,0.00015374234,0.00022930777,0.000033312244,0.00021603314,0.00045502963,0.0582554],"genre_scores_gemma":[0.9887017,0.00009755365,0.0048283534,0.00001563947,0.000014544721,0.000006235921,0.00006674022,0.000037015856,0.0062323273],"study_design_codex":"bench_or_experimental","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9998173,0.000020696598,0.0000040274535,0.000032152206,0.00010542402,0.000020281353],"domain_scores_gemma":[0.9997751,0.000039634113,0.000034427194,0.000041681946,0.00007133488,0.000037740665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00019879511,0.00034549207,0.00022169207,0.0003697965,0.00026320995,0.00059711596,0.0006311069,0.0004218368,0.0052223844],"category_scores_gemma":[0.00039212665,0.0002325633,0.00018824614,0.00027002516,0.00032962122,0.00048098675,0.00039341408,0.00047818033,0.00078451197],"study_design_candidate":"bench_or_experimental","study_design_consensus":"bench_or_experimental","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00045831126,0.00018310094,0.0016114089,0.00017263272,0.000030379762,0.0003294318,0.00017168849,0.024431765,0.8871478,0.009793045,0.0019648941,0.073705554],"study_design_scores_gemma":[0.00008535977,0.0021523277,0.029775491,0.000118441494,0.00016452082,0.0017280994,0.00037153083,0.14864378,0.7725688,0.0052619483,0.03905182,0.000077888944],"about_ca_topic_score_codex":0.00018719476,"about_ca_topic_score_gemma":0.0005233662,"teacher_disagreement_score":0.0052223844,"about_ca_system_score_codex":0.00018601476,"about_ca_system_score_gemma":0.00019232962,"threshold_uncertainty_score":0.017470598},"labels":[],"label_agreement":null},{"id":"W7107968898","doi":"10.17638/03194868","title":"Can Light Gauge Steel Frame MMC Homes act as a catalyst for the UK to reach Net-Zero?","year":2025,"lang":"","type":"article","venue":"University of Liverpool","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Carbon footprint; Greenhouse gas; Modular design; Climate change; Frame (networking); Economic shortage; Retrofitting; Resilience (materials science); Service (business)","score_opus":0.005357464763489815,"score_gpt":0.18787527270712268,"score_spread":0.18251780794363287,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7107968898","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9066799,0.0017168551,0.005776733,0.011067178,0.000346888,0.000062217914,0.0004211423,0.000099025194,0.07382999],"genre_scores_gemma":[0.9900511,0.0008638965,0.00179114,0.00047390966,0.000020759226,0.000017774042,0.000119612945,0.00002351263,0.006638253],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99931085,0.00017759272,0.000019656212,0.00007066292,0.00019806156,0.00022317728],"domain_scores_gemma":[0.9993845,0.00014773663,0.00009827331,0.00008864497,0.00019704558,0.000083751474],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0009286812,0.00027655522,0.00015849303,0.00023473352,0.00048742158,0.0022421714,0.00049651467,0.00089420786,0.005613448],"category_scores_gemma":[0.0025501347,0.00015330796,0.00026079267,0.00024229937,0.0009117833,0.0021424948,0.0013144354,0.000661945,0.0011211759],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0019188696,0.0005549778,0.19699967,0.0014249434,0.00019213452,0.005146801,0.010400507,0.0658429,0.030345364,0.24300377,0.08390312,0.36026692],"study_design_scores_gemma":[0.00022076651,0.0029121162,0.23729233,0.0015816882,0.00018470957,0.002148238,0.04158844,0.04990551,0.018940218,0.05278526,0.5921565,0.00028426462],"about_ca_topic_score_codex":0.029129038,"about_ca_topic_score_gemma":0.057687715,"teacher_disagreement_score":0.029129038,"about_ca_system_score_codex":0.0027427606,"about_ca_system_score_gemma":0.0014415379,"threshold_uncertainty_score":0.057918966},"labels":[],"label_agreement":null},{"id":"W7112021005","doi":"","title":"Investigating the Benefits of BIM for Mid-Rise Timber Buildings in Canada: A Qualitative Study","year":2021,"lang":"en","type":"article","venue":"Pure (Coventry University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Prefabrication; Process (computing); SAFER; Documentation; Demolition; Resource (disambiguation); Quality (philosophy); Building information modeling; Production (economics)","score_opus":0.01697557723118748,"score_gpt":0.21394558876663503,"score_spread":0.19697001153544755,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7112021005","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9863955,0.00036344447,0.0008270387,0.002292939,0.000019957806,0.00018323492,0.00014159581,0.00001120123,0.0097650625],"genre_scores_gemma":[0.9959059,0.00038112432,0.000609805,0.00035852962,0.000002334439,0.000089055226,0.000041961575,0.00001459613,0.002596665],"study_design_codex":"qualitative","study_design_gemma":"qualitative","domain_scores_codex":[0.9928397,0.0028683827,0.00020270428,0.00047559498,0.0018688199,0.0017447233],"domain_scores_gemma":[0.9866707,0.005974067,0.0007375971,0.00033433107,0.0039484003,0.0023349056],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.011329505,0.00042207332,0.00065482606,0.0022749938,0.022580419,0.0058855726,0.0023590736,0.0015228571,0.0033098545],"category_scores_gemma":[0.014007157,0.00064951344,0.00035795994,0.003961828,0.011919261,0.0024638388,0.0062887305,0.0028595603,0.00024235067],"study_design_candidate":"qualitative","study_design_consensus":"qualitative","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000029480338,0.00006190731,0.007831528,0.00011012379,0.000004227414,0.00071161665,0.9814933,0.00011915717,0.000609907,0.0027984534,0.0007923066,0.005437963],"study_design_scores_gemma":[0.0000018184737,0.0000124434255,0.004026794,0.00010459071,0.000003060796,0.00006731717,0.9883017,0.0001813512,0.00012759333,0.00011959544,0.007040748,0.000013093861],"about_ca_topic_score_codex":0.91977596,"about_ca_topic_score_gemma":0.9637924,"teacher_disagreement_score":0.08022404,"about_ca_system_score_codex":0.07660119,"about_ca_system_score_gemma":0.101576485,"threshold_uncertainty_score":0.55578315},"labels":[],"label_agreement":null},{"id":"W7114907706","doi":"10.2139/ssrn.5907606","title":"High-Fidelity Synthetic Construction Safety Data Generation Using 3D-Rendering and Generative AI","year":2025,"lang":"","type":"preprint","venue":"SSRN Electronic Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Toronto","funders":"","keywords":"Pipeline (software); Generative grammar; Scalability; Domain (mathematical analysis); Synthetic data; Generative model; Virtual reality","score_opus":0.023311516915061052,"score_gpt":0.2624768053080648,"score_spread":0.23916528839300372,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7114907706","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.012916439,0.00005466546,0.9765661,0.0001208517,0.000105083025,0.000095149786,0.0003843257,0.0040283734,0.005729132],"genre_scores_gemma":[0.43716243,0.00016908205,0.5546709,0.000112059715,0.000048658258,0.00014194872,0.0019135576,0.0019548165,0.0038265733],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999514,0.00006749215,0.000017380842,0.0000659809,0.00029883598,0.00003635145],"domain_scores_gemma":[0.9992804,0.0002808592,0.000036086483,0.00018132976,0.00018062146,0.000040768762],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006856266,0.0011405601,0.000768965,0.0011626359,0.00039536442,0.0015086692,0.0011159792,0.0010615902,0.008468779],"category_scores_gemma":[0.0019631903,0.0007549886,0.0011907241,0.00097563065,0.000669807,0.0007372547,0.0015786806,0.0012487373,0.0021057995],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00021292655,0.00012922693,0.0011183814,0.0002908259,0.0000651727,0.00040427962,0.00039550074,0.8125198,0.03275443,0.014358698,0.0063069253,0.13144383],"study_design_scores_gemma":[0.000018354778,0.000031987925,0.00022085967,0.000018642137,0.0000098073715,0.000111116984,0.000048961443,0.9814527,0.00790224,0.0059515676,0.0042151865,0.000018545636],"about_ca_topic_score_codex":0.0018461251,"about_ca_topic_score_gemma":0.0023406025,"teacher_disagreement_score":0.008468779,"about_ca_system_score_codex":0.0004582602,"about_ca_system_score_gemma":0.0007667643,"threshold_uncertainty_score":0.028330863},"labels":[],"label_agreement":null},{"id":"W7116631454","doi":"10.5430/wje.v15n4p73","title":"Developing a BIM Modeling Instructional Model Based on Flipped Classroom and Collaborative Learning for Architectural Engineering Students","year":2025,"lang":"","type":"article","venue":"World Journal of Education","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Formative assessment; Likert scale; Competence (human resources); Instructional design; Flipped classroom; Process (computing); Engineering education; Collaborative learning; Structural equation modeling; Educational technology","score_opus":0.01117560180951206,"score_gpt":0.2808410754032591,"score_spread":0.26966547359374704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7116631454","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.29263765,0.00017115667,0.6842818,0.0008972006,0.00007102346,0.0024420081,0.00013771842,0.0012485416,0.018112961],"genre_scores_gemma":[0.2634663,0.0002185956,0.7313334,0.00010760149,0.0000074119093,0.001671671,0.00022001336,0.000045473,0.0029295122],"study_design_codex":"design_other","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99773455,0.001083935,0.00014235351,0.00027614878,0.0006429849,0.000120003504],"domain_scores_gemma":[0.9981647,0.0007188924,0.00016544854,0.00026021237,0.0005477229,0.00014309653],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0034967528,0.0007465183,0.00048626677,0.0013987569,0.0010227652,0.001841551,0.0016758833,0.0007194507,0.0017309018],"category_scores_gemma":[0.0044859587,0.0004301358,0.00056779495,0.00059859856,0.00048346247,0.0031831234,0.001819343,0.0007255141,0.00068685313],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0002460163,0.0048505017,0.023046874,0.0008860765,0.00005667291,0.0004874831,0.01587995,0.041294385,0.02185736,0.030988783,0.005194943,0.85521096],"study_design_scores_gemma":[0.00052397826,0.0052345013,0.026866375,0.001918092,0.00036022355,0.0019815508,0.027361447,0.69966394,0.07989208,0.04266157,0.1130924,0.00044386537],"about_ca_topic_score_codex":0.0017401701,"about_ca_topic_score_gemma":0.0035436146,"teacher_disagreement_score":0.0034967528,"about_ca_system_score_codex":0.0014228249,"about_ca_system_score_gemma":0.0038469322,"threshold_uncertainty_score":0.018492818},"labels":[],"label_agreement":null},{"id":"W7117960012","doi":"10.1007/978-3-032-01074-2","title":"Proceedings of the Canadian Society for Civil Engineering Annual Conference 2024, Volume 7","year":2025,"lang":"en","type":"book","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Volume (thermodynamics); Work (physics); Government (linguistics)","score_opus":0.004624941296160505,"score_gpt":0.17577736165996755,"score_spread":0.17115242036380704,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7117960012","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0030304699,0.01695687,0.0032305752,0.024612473,0.059817366,0.00018418474,0.0052803117,0.000807596,0.8860802],"genre_scores_gemma":[0.0031077876,0.004426612,0.000831461,0.0005509281,0.00082452333,0.000025393834,0.0018528445,0.00017223139,0.98820835],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99831945,0.00008669703,0.000028052342,0.000085209685,0.001255053,0.00022541003],"domain_scores_gemma":[0.9976954,0.00007303764,0.000023232475,0.000056114524,0.0016807296,0.0004714925],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0015649378,0.0012490161,0.00092185865,0.002097583,0.002633284,0.00542952,0.0014153287,0.0019143476,0.3166893],"category_scores_gemma":[0.0016892483,0.0004799938,0.0005482409,0.0024460324,0.0010752273,0.0014510246,0.0019679712,0.0018611416,0.11764183],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000017928725,0.000020925612,0.00011863343,0.00004979399,0.0000028110367,0.000017584449,0.000023471606,0.00009266156,0.00023385396,0.0012668148,0.9696451,0.028510466],"study_design_scores_gemma":[0.0000034199973,0.000005476639,0.0005942209,0.000041647767,0.0000037957466,0.000013407925,0.00008677302,0.00013113284,0.00014732277,0.00045976505,0.9985067,0.000006325282],"about_ca_topic_score_codex":0.41973987,"about_ca_topic_score_gemma":0.6961082,"teacher_disagreement_score":0.992198,"about_ca_system_score_codex":0.00780202,"about_ca_system_score_gemma":0.025594749,"threshold_uncertainty_score":0.97465974},"labels":[],"label_agreement":null},{"id":"W7118000314","doi":"10.1007/978-3-032-01074-2_7","title":"Concerted Actions for BIM Training as Part of a National Digital Transition Plan: A Case Study","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Cégep du Vieux Montréal; École de Technologie Supérieure; Group for Research in Decision Analysis","funders":"","keywords":"Training (meteorology); Cornerstone; Listing (finance); Work (physics); Government (linguistics); Set (abstract data type)","score_opus":0.027549232334380596,"score_gpt":0.24089646197317494,"score_spread":0.21334722963879435,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118000314","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.93405366,0.00015235017,0.0036878237,0.0025999867,0.000056242305,0.00035235772,0.00010946394,0.000055791905,0.058932297],"genre_scores_gemma":[0.98630166,0.00011959827,0.0032610635,0.00022239093,0.000007086365,0.0001423777,0.00005462886,0.000017518227,0.0098737255],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99743795,0.0012728894,0.000052338135,0.00015496575,0.00025831035,0.0008235331],"domain_scores_gemma":[0.9958353,0.0020642697,0.00027863786,0.0003048627,0.0002873449,0.0012294912],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036366987,0.00030991124,0.00018314083,0.0008329683,0.008228479,0.00322144,0.0018205356,0.003481068,0.0065307855],"category_scores_gemma":[0.0054777265,0.00030778238,0.00035442435,0.0010866434,0.002168313,0.0015645362,0.0030006648,0.0024633117,0.00081763515],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0015925183,0.026320942,0.08649074,0.00061893766,0.0000687399,0.0536147,0.31679976,0.011960599,0.007560165,0.1360902,0.036121566,0.32276118],"study_design_scores_gemma":[0.00026517178,0.0027335102,0.059815574,0.00045822692,0.00008002323,0.008975126,0.7571602,0.014208854,0.0044449954,0.009885716,0.14185956,0.000113068236],"about_ca_topic_score_codex":0.017202262,"about_ca_topic_score_gemma":0.06275591,"teacher_disagreement_score":0.017202262,"about_ca_system_score_codex":0.004495007,"about_ca_system_score_gemma":0.0058680056,"threshold_uncertainty_score":0.034204245},"labels":[],"label_agreement":null},{"id":"W7118003536","doi":"10.1007/978-3-032-01074-2_4","title":"Enhancing Productivity and Efficiency in Steel Fabrication for Off-Site Construction: A Study on Accurate Estimation Models","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Productivity; Production (economics); Cost estimate; Estimation; Quality (philosophy); Fabrication; Duration (music); Steel mill","score_opus":0.010397744216876597,"score_gpt":0.21979223600338618,"score_spread":0.2093944917865096,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118003536","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.21390973,0.0017500286,0.77466553,0.0003632309,0.000039001316,0.00003175911,0.000083423925,0.00025514796,0.008902198],"genre_scores_gemma":[0.9296,0.0012124921,0.0656545,0.000036797304,0.000028233419,0.000024920442,0.00016597054,0.00016582057,0.003111196],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9974589,0.0011852817,0.00009406303,0.0004327857,0.000649295,0.00017965781],"domain_scores_gemma":[0.9651145,0.030977229,0.0010716623,0.0015600966,0.0012045299,0.00007187348],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041683516,0.00078163645,0.0007820991,0.0006193544,0.0002896349,0.0023806852,0.0013498887,0.0013031574,0.001349196],"category_scores_gemma":[0.027188938,0.00085459393,0.00094220747,0.0013029502,0.00079350267,0.0043719336,0.00068562885,0.0013481375,0.00030659686],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00016672362,0.0002566362,0.009207757,0.00019133888,0.00006770636,0.00014048857,0.0005600636,0.7667397,0.002980363,0.056341957,0.00081637304,0.16253088],"study_design_scores_gemma":[0.0000039618576,0.000077384444,0.0027252056,0.000025838995,0.00004505619,0.000050787286,0.00011693274,0.98274946,0.002661254,0.010822777,0.00070655043,0.000014652873],"about_ca_topic_score_codex":0.006305592,"about_ca_topic_score_gemma":0.0031083464,"teacher_disagreement_score":0.006305592,"about_ca_system_score_codex":0.0010989833,"about_ca_system_score_gemma":0.0011138339,"threshold_uncertainty_score":0.022044599},"labels":[],"label_agreement":null},{"id":"W7118013839","doi":"10.1007/978-3-032-01074-2_3","title":"Modular Construction Planning and Constructability Analysis for Energy Storage Systems Using a Digitized Platform","year":2025,"lang":"en","type":"book-chapter","venue":"Lecture notes in civil engineering","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of New Brunswick","funders":"","keywords":"Constructability; Modular design; Pinch analysis; Efficient energy use; Stakeholder; Renewable energy; Timeline; Construction management; Energy storage","score_opus":0.01090926245875461,"score_gpt":0.20253308267603884,"score_spread":0.19162382021728422,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118013839","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.05907359,0.00014308418,0.9290081,0.000045818975,0.0000094570205,0.00004008747,0.0001146358,0.00020157793,0.011363583],"genre_scores_gemma":[0.86735505,0.00029622135,0.12354558,0.000010355304,0.000010545816,0.00008316535,0.0003079815,0.00011497358,0.008276102],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9998266,0.000030606898,0.000008734337,0.000043437,0.00006701087,0.000023663271],"domain_scores_gemma":[0.99973315,0.00015283673,0.000024674455,0.000035116354,0.000046772024,0.00000753556],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003106502,0.0006076851,0.00046709043,0.0010263073,0.00047620348,0.0010405539,0.00057223125,0.00037602228,0.0045830305],"category_scores_gemma":[0.0007513726,0.00046362952,0.00090655923,0.0010737721,0.00074498536,0.0010539567,0.0006377359,0.00050625333,0.00037581744],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000026810243,0.000020335037,0.0005402151,0.000049557773,0.000011497078,0.000065105196,0.000052356223,0.91155237,0.004330267,0.041633748,0.00032853129,0.04138913],"study_design_scores_gemma":[0.000002197991,0.00002438391,0.0005361499,0.0000075301336,0.000011641231,0.000032735123,0.00003871513,0.9767091,0.002384722,0.019304233,0.0009415492,0.000007013116],"about_ca_topic_score_codex":0.0050966498,"about_ca_topic_score_gemma":0.006003598,"teacher_disagreement_score":0.0050966498,"about_ca_system_score_codex":0.0008585632,"about_ca_system_score_gemma":0.00069750374,"threshold_uncertainty_score":0.015331745},"labels":[],"label_agreement":null},{"id":"W7118121254","doi":"10.5281/zenodo.18137096","title":"Maximizing the Project Efficiency Through Comprehensive BIM Coordination and GIS Integration","year":2024,"lang":"","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Timeline; Drone; Work (physics); Project management; Geographic information system; System integration; Data integration; Cloud computing","score_opus":0.03872971686596222,"score_gpt":0.2549167738732913,"score_spread":0.2161870570073291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118121254","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041438714,0.0004986453,0.90511346,0.001107772,0.00007594594,0.0003679649,0.0003498623,0.0043983557,0.04664914],"genre_scores_gemma":[0.36711615,0.000631117,0.61812896,0.00017001647,0.000045339264,0.00059812766,0.0010713314,0.0013829753,0.01085594],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9900394,0.003187456,0.000659276,0.0009434429,0.00436254,0.0008077976],"domain_scores_gemma":[0.99429685,0.0009680517,0.0006300843,0.0020564762,0.0016582243,0.00039031892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008869359,0.0016043801,0.0012863838,0.0050826166,0.0012590092,0.0067151478,0.001794587,0.00085298397,0.006897332],"category_scores_gemma":[0.010408756,0.0010015778,0.0006872257,0.0062691984,0.0011498191,0.0054521128,0.0074570533,0.0009416999,0.004463275],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023700549,0.0004852035,0.009621539,0.00040050747,0.00015186386,0.00024053262,0.0017073381,0.17020684,0.016199399,0.062871516,0.019532654,0.7183455],"study_design_scores_gemma":[0.00017178387,0.0005375098,0.027198024,0.00048074525,0.00024622466,0.0010786452,0.0058476403,0.47786814,0.040386233,0.13810763,0.30783606,0.0002413566],"about_ca_topic_score_codex":0.0029830316,"about_ca_topic_score_gemma":0.0036974542,"teacher_disagreement_score":0.008869359,"about_ca_system_score_codex":0.0017774692,"about_ca_system_score_gemma":0.00432637,"threshold_uncertainty_score":0.046906233},"labels":[],"label_agreement":null},{"id":"W7118122392","doi":"10.5281/zenodo.18137097","title":"Maximizing the Project Efficiency Through Comprehensive BIM Coordination and GIS Integration","year":2024,"lang":"","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Timeline; Drone; Work (physics); Project management; Geographic information system; System integration; Data integration; Cloud computing","score_opus":0.03872971686596222,"score_gpt":0.2549167738732913,"score_spread":0.2161870570073291,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7118122392","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.041438714,0.0004986453,0.90511346,0.001107772,0.00007594594,0.0003679649,0.0003498623,0.0043983557,0.04664914],"genre_scores_gemma":[0.36711615,0.000631117,0.61812896,0.00017001647,0.000045339264,0.00059812766,0.0010713314,0.0013829753,0.01085594],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.9900394,0.003187456,0.000659276,0.0009434429,0.00436254,0.0008077976],"domain_scores_gemma":[0.99429685,0.0009680517,0.0006300843,0.0020564762,0.0016582243,0.00039031892],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008869359,0.0016043801,0.0012863838,0.0050826166,0.0012590092,0.0067151478,0.001794587,0.00085298397,0.006897332],"category_scores_gemma":[0.010408756,0.0010015778,0.0006872257,0.0062691984,0.0011498191,0.0054521128,0.0074570533,0.0009416999,0.004463275],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00023700549,0.0004852035,0.009621539,0.00040050747,0.00015186386,0.00024053262,0.0017073381,0.17020684,0.016199399,0.062871516,0.019532654,0.7183455],"study_design_scores_gemma":[0.00017178387,0.0005375098,0.027198024,0.00048074525,0.00024622466,0.0010786452,0.0058476403,0.47786814,0.040386233,0.13810763,0.30783606,0.0002413566],"about_ca_topic_score_codex":0.0029830316,"about_ca_topic_score_gemma":0.0036974542,"teacher_disagreement_score":0.008869359,"about_ca_system_score_codex":0.0017774692,"about_ca_system_score_gemma":0.00432637,"threshold_uncertainty_score":0.046906233},"labels":[],"label_agreement":null},{"id":"W7119569717","doi":"","title":"Industrial housing as European crisis response","year":2025,"lang":"en","type":"article","venue":"University of Southern Denmark Research Portal (University of Southern Denmark)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Innovation Cluster (Canada)","funders":"","keywords":"Desk; Affordable housing; Production (economics); Productivity; Industrial policy; Industrial production; Public policy; Financial crisis","score_opus":0.025198651945721396,"score_gpt":0.23178388370635677,"score_spread":0.20658523176063537,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7119569717","genre_codex":"other","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.42872176,0.011837605,0.0016410142,0.034668513,0.0009294408,0.000043445343,0.00095404824,0.00019887343,0.5210053],"genre_scores_gemma":[0.97644097,0.002656941,0.0005122946,0.0026058804,0.0001083545,0.000025633179,0.0005356711,0.000051797484,0.017062504],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"observational","domain_scores_codex":[0.99804413,0.00066146563,0.00009183431,0.00020367766,0.00046237145,0.00053650094],"domain_scores_gemma":[0.9993844,0.00013719025,0.000143031,0.000063847474,0.00014241619,0.00012914541],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0025352573,0.0003769511,0.0002667725,0.0010885306,0.001462479,0.0061274865,0.0005476408,0.00240365,0.011742825],"category_scores_gemma":[0.0028179113,0.00015963131,0.0002663765,0.0018360812,0.0021743795,0.0025826145,0.00441738,0.0011156035,0.0012484227],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0006767598,0.00030395144,0.027512552,0.00057444593,0.000059962855,0.0033466849,0.022842174,0.0055147205,0.0013520333,0.5886244,0.1626481,0.18654422],"study_design_scores_gemma":[0.000048958304,0.00013646053,0.063758284,0.0006088278,0.000016197848,0.0011354394,0.0363795,0.0019633821,0.0009954906,0.031032734,0.863876,0.00004877567],"about_ca_topic_score_codex":0.005352887,"about_ca_topic_score_gemma":0.0032190473,"teacher_disagreement_score":0.011742825,"about_ca_system_score_codex":0.0041260547,"about_ca_system_score_gemma":0.0012571405,"threshold_uncertainty_score":0.039283693},"labels":[],"label_agreement":null},{"id":"W7125606114","doi":"10.1109/wsc68292.2025.11339107","title":"Optimizing Precast Concrete Production: A Discrete-Event Simulation Approach with Simphony","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"University of Alberta","funders":"","keywords":"Precast concrete; Work (physics); Joint (building); Process (computing)","score_opus":0.009569416548447786,"score_gpt":0.2305413048768909,"score_spread":0.2209718883284431,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7125606114","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.18154685,0.00016257227,0.78019255,0.0002945734,0.00009884797,0.00023881285,0.00037360375,0.0015791154,0.03551303],"genre_scores_gemma":[0.91647047,0.000085661166,0.07974706,0.00005540874,0.000012939996,0.00015697247,0.00016194914,0.0001542126,0.0031553884],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.999597,0.00011836457,0.000018296849,0.00006295408,0.00014089304,0.00006254303],"domain_scores_gemma":[0.9993032,0.00042224914,0.00006091496,0.00006372671,0.00009981676,0.000050044287],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0007225451,0.0007927339,0.0013998656,0.00064083864,0.0007193674,0.0015556952,0.0016255914,0.0015606238,0.0059462986],"category_scores_gemma":[0.0016264135,0.0010311484,0.0010152439,0.0007701214,0.0007474864,0.0010028549,0.0011247805,0.0009679446,0.00048557363],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000027673883,0.000030671774,0.00015066296,0.00001123827,0.000005927159,0.000015784139,0.000010182711,0.99675936,0.00031478482,0.00097583845,0.000048169884,0.0016496408],"study_design_scores_gemma":[0.0000051004495,0.0000071954755,0.000023801536,0.0000010907052,0.0000017040301,0.0000018354159,0.0000032976295,0.9994005,0.00021854008,0.00024584928,0.00008931694,0.0000017279733],"about_ca_topic_score_codex":0.014649868,"about_ca_topic_score_gemma":0.011180588,"teacher_disagreement_score":0.014649868,"about_ca_system_score_codex":0.0010859903,"about_ca_system_score_gemma":0.0018784316,"threshold_uncertainty_score":0.029129207},"labels":[],"label_agreement":null},{"id":"W7126020313","doi":"10.22178/pos.125-15","title":"Global Adoption of Digital Tools and Innovation in Construction: A Comparative Analysis of the UK, US, Canada, Africa, China, and Europe","year":2025,"lang":"en","type":"article","venue":"Path of Science","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Pace; Digital transformation; Investment (military); Certification; Government (linguistics); Key (lock); Information technology; Private sector","score_opus":0.011549227709282359,"score_gpt":0.22138066999537223,"score_spread":0.20983144228608988,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126020313","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98840976,0.0032180073,0.00009061942,0.0003375517,0.000010727984,0.000014181522,0.00045553208,0.000004702195,0.007458997],"genre_scores_gemma":[0.9962287,0.0026774134,0.00012794926,0.000059700415,0.0000026041253,0.0000058858054,0.00027330537,0.0000039755682,0.0006203952],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9985526,0.00020110079,0.00008677361,0.00014040411,0.0005041744,0.0005149575],"domain_scores_gemma":[0.9971003,0.0006605269,0.0005438661,0.000085301624,0.0012111226,0.0003988815],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0012410028,0.00022482051,0.00025859033,0.0048088855,0.0011726281,0.0021663094,0.0003162475,0.0003142336,0.0016096736],"category_scores_gemma":[0.003041734,0.00012218437,0.00036000047,0.013237756,0.0013665643,0.0013584587,0.0014173519,0.00032588787,0.00014000325],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019753826,0.000070593414,0.87346834,0.00055303425,0.00012487952,0.0011436298,0.033200137,0.00040388835,0.00049448875,0.0043437686,0.00191408,0.08408574],"study_design_scores_gemma":[0.0000034701766,0.000043724653,0.95669174,0.00021277295,0.000045959372,0.00025619075,0.034378942,0.00012951877,0.00015915211,0.00007388066,0.007980478,0.00002411897],"about_ca_topic_score_codex":0.7795339,"about_ca_topic_score_gemma":0.8899952,"teacher_disagreement_score":0.22046608,"about_ca_system_score_codex":0.009364206,"about_ca_system_score_gemma":0.009546455,"threshold_uncertainty_score":0.4435289},"labels":[],"label_agreement":null},{"id":"W7126047724","doi":"10.1109/icac69156.2025.11361506","title":"Digital Collaboration Through BIM and its Influence on Project Success in Socio-Economic Contexts","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Inro Consultants (Canada)","funders":"","keywords":"Building information modeling; Stakeholder; Project stakeholder; Schedule; Project management; Project planning; Exploratory research; Integrated project delivery","score_opus":0.0073535610597753745,"score_gpt":0.259436662829289,"score_spread":0.25208310176951365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7126047724","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9799382,0.00058909744,0.001130214,0.0010421377,0.000021445607,0.00003667821,0.00003755929,0.000010948249,0.017193545],"genre_scores_gemma":[0.9989986,0.00027586464,0.0002635421,0.000022038896,0.00000700031,0.000024452085,0.000011798945,0.0000049568057,0.00039183674],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9682105,0.022153957,0.0011313466,0.001251785,0.004218937,0.0030334801],"domain_scores_gemma":[0.9552204,0.023510832,0.008760964,0.0015433596,0.0039170785,0.0070473403],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.013264256,0.00039376738,0.000548565,0.0041861422,0.005641622,0.00876741,0.0010181881,0.0010364797,0.0049298545],"category_scores_gemma":[0.0370468,0.00041848377,0.00052703137,0.0045157243,0.0055056517,0.0040102303,0.012459876,0.0013245025,0.0005737531],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0003079811,0.00094165356,0.7010384,0.0004141978,0.0002562821,0.0019596515,0.1824079,0.0017488999,0.00044838982,0.019699262,0.0021033336,0.08867412],"study_design_scores_gemma":[0.000017810764,0.00030002312,0.6416822,0.00043941708,0.000109789384,0.0005120844,0.3296809,0.0023023523,0.0002912956,0.007831753,0.01674069,0.00009174979],"about_ca_topic_score_codex":0.007382548,"about_ca_topic_score_gemma":0.008841436,"teacher_disagreement_score":0.013264256,"about_ca_system_score_codex":0.0031711631,"about_ca_system_score_gemma":0.0048145684,"threshold_uncertainty_score":0.070148945},"labels":[],"label_agreement":null},{"id":"W7127882557","doi":"10.22260/crc-csce-2025/0008","title":"AI-Supported Real-Time Schedule Updating and Maintenance in 4D BIM","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Schedule; Process (computing); Key (lock); Scheduling (production processes); Production (economics)","score_opus":0.004453973915059728,"score_gpt":0.22143950357115372,"score_spread":0.216985529656094,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127882557","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02607674,0.00006818694,0.9495465,0.00010348359,0.00006729747,0.00013046927,0.00026427777,0.017114041,0.006629041],"genre_scores_gemma":[0.26885462,0.000115233284,0.7236378,0.000074729796,0.00002816401,0.00024070058,0.00062948395,0.0010377724,0.0053814026],"study_design_codex":"design_other","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99908555,0.00018572151,0.000049183152,0.00016577625,0.00045214506,0.00006170173],"domain_scores_gemma":[0.9987908,0.0004984561,0.0001364331,0.00026698504,0.00022564468,0.00008171724],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0010171066,0.00063106633,0.0004154308,0.0010065429,0.00047490632,0.0011174883,0.0017698844,0.00054668094,0.005568771],"category_scores_gemma":[0.002984734,0.00043766576,0.0003989219,0.00070567086,0.0005026562,0.0012850423,0.0013563869,0.00054194755,0.0016108181],"study_design_candidate":"simulation_or_modeling","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005591346,0.00032215673,0.0027956956,0.00039837958,0.000049714192,0.00055145775,0.0020510196,0.18530452,0.061626695,0.01654898,0.010083272,0.71970904],"study_design_scores_gemma":[0.00005583516,0.00009703219,0.0012934931,0.000028743892,0.000022129352,0.00019209004,0.00030350438,0.922287,0.028075391,0.006212466,0.04137401,0.0000582174],"about_ca_topic_score_codex":0.0050435783,"about_ca_topic_score_gemma":0.0064098313,"teacher_disagreement_score":0.005568771,"about_ca_system_score_codex":0.00046758915,"about_ca_system_score_gemma":0.0011498876,"threshold_uncertainty_score":0.018629372},"labels":[],"label_agreement":null},{"id":"W7127941768","doi":"10.22260/crc-csce-2025/0030","title":"Standardizing whole-building lifecycle assessment (wbLCA) benchmarking framework facilitated by adopting OpenBIM for Canadian building sector","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Benchmarking; Process (computing); Measure (data warehouse); Work (physics); System lifecycle","score_opus":0.010982047889720814,"score_gpt":0.27987274328474054,"score_spread":0.26889069539501975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127941768","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.042675514,0.0011619596,0.8741231,0.004449267,0.00020923294,0.0014900086,0.0042819064,0.001966786,0.06964221],"genre_scores_gemma":[0.29125232,0.0010548603,0.69548196,0.00037977324,0.000034421424,0.0011185142,0.0048743463,0.00026787003,0.0055359355],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.97861564,0.0051005296,0.0013833982,0.0015545733,0.011660536,0.0016853907],"domain_scores_gemma":[0.9780116,0.0020478582,0.0011079737,0.0027109543,0.01543742,0.00068424916],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.021281581,0.0011539167,0.00086520036,0.009604974,0.0033616645,0.0073883855,0.0045292727,0.0011501252,0.002698303],"category_scores_gemma":[0.032193128,0.00054359634,0.0018352317,0.0099243885,0.0030619374,0.004281356,0.0068849837,0.0020938045,0.0005373258],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":true,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00012483822,0.00021899889,0.021285487,0.0008577809,0.00012577321,0.00022889159,0.002287155,0.11053005,0.004204494,0.49383032,0.016935682,0.34937045],"study_design_scores_gemma":[0.00006337161,0.00020666147,0.07110009,0.0018830142,0.00020583693,0.00026502673,0.0065303454,0.4020148,0.010740506,0.2293928,0.27701595,0.0005815459],"about_ca_topic_score_codex":0.76498455,"about_ca_topic_score_gemma":0.792835,"teacher_disagreement_score":0.95711666,"about_ca_system_score_codex":0.042883355,"about_ca_system_score_gemma":0.078146055,"threshold_uncertainty_score":0.472799},"labels":[],"label_agreement":null},{"id":"W7127945557","doi":"10.22260/crc-csce-2025/0150","title":"Assessing the Effectiveness of BIM in Achieving Compliance with NECB Energy Efficiency Pathways","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Efficient energy use; Compliance (psychology); Energy (signal processing); Production (economics); Key (lock)","score_opus":0.014279999607224784,"score_gpt":0.24887183679678468,"score_spread":0.2345918371895599,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127945557","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.5971563,0.012371178,0.19509944,0.0073850877,0.00029510687,0.00420232,0.0038373482,0.0011372264,0.17851593],"genre_scores_gemma":[0.7985978,0.00746203,0.18548529,0.0005555051,0.000045427663,0.0016461476,0.003057418,0.00024524826,0.002905098],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.91704845,0.03394457,0.00836342,0.003097941,0.035421047,0.0021245957],"domain_scores_gemma":[0.8314271,0.08977853,0.014895531,0.0108639235,0.05180244,0.0012324498],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.076827414,0.00091892,0.0009291353,0.01349655,0.0021711614,0.012309931,0.0025812553,0.0020509278,0.0025676787],"category_scores_gemma":[0.17806312,0.0006970739,0.0012964723,0.015529332,0.0020650495,0.008130913,0.0048467526,0.0013554489,0.00089424924],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00047700852,0.0006315538,0.10258661,0.008678133,0.00039325462,0.0005559754,0.016067512,0.043180548,0.0034709566,0.08603133,0.007810543,0.7301166],"study_design_scores_gemma":[0.0002444864,0.0025449614,0.23062417,0.03286834,0.00235338,0.0014652367,0.09450633,0.14432329,0.052989617,0.07163885,0.365664,0.00077738386],"about_ca_topic_score_codex":0.01971344,"about_ca_topic_score_gemma":0.025723828,"teacher_disagreement_score":0.076827414,"about_ca_system_score_codex":0.008661635,"about_ca_system_score_gemma":0.025213366,"threshold_uncertainty_score":0.40630704},"labels":[],"label_agreement":null},{"id":"W7127952500","doi":"10.22260/crc-csce-2025/0202","title":"Enhancing Request for Information (RFI) Process in Construction through Digitalization and Automation","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada","keywords":"Process (computing); Automation; Process automation system; Information system; Information technology","score_opus":0.004733481902958049,"score_gpt":0.235377252708329,"score_spread":0.23064377080537093,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127952500","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.15567614,0.0021807,0.7278647,0.014414885,0.0002119887,0.0014577366,0.00043833393,0.0025260148,0.09522945],"genre_scores_gemma":[0.60115844,0.002237739,0.38912812,0.00088584644,0.00010201491,0.0005654166,0.0006660327,0.0003766255,0.004879763],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9449529,0.031416778,0.004033275,0.0031703764,0.013956669,0.0024700454],"domain_scores_gemma":[0.878587,0.075272605,0.010781762,0.025038451,0.009131794,0.0011883058],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.03970806,0.000846487,0.00058891124,0.006250017,0.0032361015,0.010701757,0.0024054958,0.0019933186,0.0035596834],"category_scores_gemma":[0.06590657,0.00071503414,0.0010966704,0.008297501,0.00794903,0.01609545,0.008564851,0.002677762,0.0013245556],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020834389,0.0003486346,0.017253615,0.0019951882,0.00008057462,0.00079400925,0.04110974,0.014202564,0.009381661,0.2952515,0.007871427,0.6115028],"study_design_scores_gemma":[0.00012938067,0.00043038023,0.020587143,0.002958503,0.00023548954,0.0021289736,0.03340594,0.059392158,0.030843941,0.34218934,0.507266,0.00043267081],"about_ca_topic_score_codex":0.0047036624,"about_ca_topic_score_gemma":0.0050465562,"teacher_disagreement_score":0.03970806,"about_ca_system_score_codex":0.00665587,"about_ca_system_score_gemma":0.01625194,"threshold_uncertainty_score":0.20999885},"labels":[],"label_agreement":null},{"id":"W7127964300","doi":"10.22260/crc-csce-2025/0211","title":"Current Status of Digital Twins in the AEC Industry and Opportunities in Construction Project Management from a Literature Review and a Quebec Perspective","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Perspective (graphical); Project management; Current (fluid); Construction industry; Construction management","score_opus":0.02083204261100219,"score_gpt":0.27032672875607033,"score_spread":0.24949468614506815,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127964300","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.019410964,0.94000864,0.0011230377,0.011976681,0.00037815707,0.000047638037,0.0008140943,0.000044457855,0.026196346],"genre_scores_gemma":[0.2836115,0.706478,0.002699478,0.0018848584,0.0001470717,0.000066908586,0.0007571522,0.000027824699,0.0043272804],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9949673,0.0010867086,0.0005161494,0.00047671166,0.0024887312,0.00046431102],"domain_scores_gemma":[0.970747,0.013654715,0.0023735873,0.00033815345,0.011794664,0.0010919152],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.008049166,0.00047353216,0.0007937775,0.016213523,0.00340087,0.009347603,0.0014195667,0.0014630766,0.004587967],"category_scores_gemma":[0.014068203,0.00035480858,0.0005798836,0.033502206,0.0036527782,0.0036486275,0.0013873734,0.0010237015,0.00030497127],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00013816208,0.00008603316,0.01896499,0.036304418,0.00019781936,0.0010412966,0.014537992,0.001519241,0.0011138616,0.057829753,0.033732213,0.83453435],"study_design_scores_gemma":[0.000013629374,0.00008760978,0.08366997,0.06313128,0.00053810736,0.000981791,0.04053109,0.0012299395,0.0008397126,0.0029061583,0.80591017,0.00016050378],"about_ca_topic_score_codex":0.9221687,"about_ca_topic_score_gemma":0.95717555,"teacher_disagreement_score":0.07783133,"about_ca_system_score_codex":0.060373798,"about_ca_system_score_gemma":0.11816333,"threshold_uncertainty_score":0.4380446},"labels":[],"label_agreement":null},{"id":"W7127967568","doi":"10.22260/crc-csce-2025/0129","title":"Conceptual Model for Enhancing Construction Productivity Through Real-Time Physiological Monitoring and Fuzzy Hybrid Modeling","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Canada Research Chairs; Canada First Research Excellence Fund; University of Alberta","keywords":"Conceptual model; Fuzzy logic; Productivity; Conceptual design; Field (mathematics); Component (thermodynamics); Data modeling","score_opus":0.026836496668527627,"score_gpt":0.2598339678347913,"score_spread":0.23299747116626365,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127967568","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.013440599,0.00023797882,0.9754895,0.0005645247,0.000044289773,0.00007181833,0.00009549645,0.00012468432,0.009931111],"genre_scores_gemma":[0.7259812,0.00072942005,0.26751363,0.00013169911,0.000050882092,0.0004989894,0.00020421119,0.000029805798,0.004860211],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.99955934,0.00011477107,0.000023823624,0.00010432421,0.0001520087,0.000045666628],"domain_scores_gemma":[0.99959105,0.00015449504,0.00006772671,0.000026928828,0.00012370449,0.000036111196],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.001027681,0.00084122195,0.00030871163,0.001395004,0.0005180108,0.0019745268,0.0016609479,0.0010594997,0.00230019],"category_scores_gemma":[0.0014184829,0.00027676678,0.0008817649,0.0007352109,0.0008549401,0.0017396723,0.0011649678,0.00068866357,0.00030226828],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000065841414,0.00015740836,0.0027721024,0.00025949965,0.00007257884,0.00026641856,0.0007650306,0.6377877,0.005752284,0.30346453,0.0015708085,0.047065847],"study_design_scores_gemma":[0.00001176411,0.00007312862,0.0006905318,0.00006094692,0.000030076968,0.00006899371,0.00020533621,0.94500756,0.0007430376,0.048102666,0.0049791574,0.000026831443],"about_ca_topic_score_codex":0.0076239333,"about_ca_topic_score_gemma":0.00516868,"teacher_disagreement_score":0.0076239333,"about_ca_system_score_codex":0.0012710346,"about_ca_system_score_gemma":0.0015678275,"threshold_uncertainty_score":0.01515913},"labels":[],"label_agreement":null},{"id":"W7127969627","doi":"10.22260/crc-csce-2025/0060","title":"Physics-Based Simulation for Construction Activity Sequence Planning","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; University of Alberta","keywords":"Sequence (biology); Process (computing); Identification (biology); Key (lock); Context (archaeology)","score_opus":0.03371704381223966,"score_gpt":0.3080498975055795,"score_spread":0.2743328536933398,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127969627","genre_codex":"methods","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.118590884,0.00023531029,0.8420718,0.00033077685,0.00012960302,0.0002330302,0.0008850406,0.0023771503,0.035146352],"genre_scores_gemma":[0.9224954,0.0002020865,0.072437964,0.000061747975,0.00001587505,0.00019702301,0.00049547595,0.00015621219,0.0039382586],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.99974054,0.00007167486,0.000012599628,0.000034718156,0.00011012047,0.000030323907],"domain_scores_gemma":[0.9995222,0.00028496824,0.000028384193,0.00004583422,0.000082151186,0.000036492143],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00034406575,0.0005353148,0.0009806084,0.0007695133,0.0006130002,0.0010650733,0.0011827986,0.0011427597,0.0064003696],"category_scores_gemma":[0.0014805906,0.0006754697,0.000775156,0.000999079,0.0005697471,0.0007477824,0.0009510017,0.0007382822,0.0006336712],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00002128257,0.000032974724,0.00019560677,0.000012896965,0.000008354334,0.000022723361,0.000018428193,0.9930091,0.0003235509,0.0029242644,0.00017137997,0.0032594972],"study_design_scores_gemma":[0.000005869823,0.000005831369,0.000058364792,0.000002149812,0.0000022682018,0.000004476002,0.0000043300142,0.9982437,0.00015352457,0.0011997963,0.0003169481,0.0000026774571],"about_ca_topic_score_codex":0.028823677,"about_ca_topic_score_gemma":0.022933785,"teacher_disagreement_score":0.028823677,"about_ca_system_score_codex":0.0010394457,"about_ca_system_score_gemma":0.001821412,"threshold_uncertainty_score":0.057311773},"labels":[],"label_agreement":null},{"id":"W7127994154","doi":"10.22260/crc-csce-2025/0039","title":"Review of the policy context surrounding the digital transformation of the public construction industry in France and Quebec","year":2025,"lang":"en","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Context (archaeology); Construction industry; Digital transformation; Public policy; Industry 4.0","score_opus":0.0072197432617208,"score_gpt":0.21697835824747538,"score_spread":0.20975861498575457,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7127994154","genre_codex":"review","genre_gemma":"review","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"review","genre_consensus":"review","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.020846508,0.7548124,0.000548081,0.11744955,0.0032894649,0.00009732931,0.0017720168,0.000060685295,0.10112385],"genre_scores_gemma":[0.2140825,0.7354948,0.000943145,0.021540368,0.0018114118,0.00010888425,0.001308234,0.000053961434,0.024656648],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9959013,0.0009440884,0.00024324037,0.00022546743,0.0018886388,0.00079732476],"domain_scores_gemma":[0.9806873,0.005399147,0.0009261793,0.00021388454,0.012039218,0.00073436665],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.006816132,0.0004110928,0.0007961944,0.0072647687,0.0034740581,0.008368764,0.0014995685,0.0021693036,0.008387343],"category_scores_gemma":[0.015377834,0.00024148042,0.00052854465,0.012588551,0.0025097965,0.0016558495,0.001060071,0.0019535627,0.0005045629],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020380702,0.00011366169,0.008136851,0.015415228,0.00019146019,0.0011309927,0.006190675,0.0041585737,0.0012652079,0.16376795,0.4167984,0.3826273],"study_design_scores_gemma":[0.000010837974,0.000021795915,0.021368325,0.011069931,0.00008364333,0.00009415409,0.003959488,0.00022368666,0.00021420351,0.0012760588,0.9616435,0.00003440263],"about_ca_topic_score_codex":0.9531216,"about_ca_topic_score_gemma":0.9730771,"teacher_disagreement_score":0.089822784,"about_ca_system_score_codex":0.089822784,"about_ca_system_score_gemma":0.16498311,"threshold_uncertainty_score":0.65171295},"labels":[],"label_agreement":null},{"id":"W7128036218","doi":"10.22260/crc-csce-2025/0194","title":"Optimizing DFMA Implementation in On-Site Construction: A Decision-Making Framework","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"National Research Council Canada","keywords":"Process (computing); Work (physics); Software; Key (lock); Quality (philosophy)","score_opus":0.00685653612121638,"score_gpt":0.2904395617105004,"score_spread":0.283583025589284,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128036218","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035997678,0.00017304947,0.94972634,0.00044318367,0.000034582674,0.00021346191,0.00007618081,0.0003006084,0.0130349025],"genre_scores_gemma":[0.7128368,0.00012484142,0.2839417,0.00009567415,0.000024076797,0.00021529068,0.00011359074,0.0001236282,0.0025245156],"study_design_codex":"simulation_or_modeling","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.9937323,0.003195285,0.0001828684,0.0005588147,0.0013944916,0.00093616475],"domain_scores_gemma":[0.9933581,0.00428417,0.00037845172,0.0005026923,0.0012355567,0.00024104219],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0085591925,0.0014086572,0.0025018216,0.002183587,0.0013730027,0.004330262,0.0034893337,0.0026248032,0.005739197],"category_scores_gemma":[0.01490271,0.0011306469,0.0013755562,0.0015820068,0.0015865911,0.003732974,0.0029099737,0.0017573652,0.00052177004],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00014433687,0.00028004378,0.0010852835,0.00008117943,0.00007423599,0.000063850464,0.00014701925,0.88054097,0.0017704882,0.023189206,0.0007247709,0.091898605],"study_design_scores_gemma":[0.00001462756,0.000079356265,0.00029170536,0.000019960677,0.000023196475,0.000014071158,0.00007038109,0.9858095,0.0010052301,0.011967948,0.00068669696,0.000017245047],"about_ca_topic_score_codex":0.014380822,"about_ca_topic_score_gemma":0.018246908,"teacher_disagreement_score":0.014380822,"about_ca_system_score_codex":0.002926825,"about_ca_system_score_gemma":0.0061986158,"threshold_uncertainty_score":0.045265913},"labels":[],"label_agreement":null},{"id":"W7128039869","doi":"10.22260/crc-csce-2025/0159","title":"Unlocking Digital Construction Management Software to Support Cash Flow and Profitability Analysis","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Natural Sciences and Engineering Research Council of Canada; Mitacs","keywords":"Profitability index; Cash flow; Software; Cash flow forecasting; Payment; Construction management; Cash","score_opus":0.00520425482033174,"score_gpt":0.2172607756755987,"score_spread":0.21205652085526697,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128039869","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.08953224,0.0003055216,0.8483771,0.00052656356,0.00009025277,0.00044756086,0.0042375005,0.038588885,0.017894315],"genre_scores_gemma":[0.39896482,0.00044591448,0.58576393,0.00015683299,0.000082313716,0.0005068856,0.00642778,0.0012746705,0.0063768304],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.9990036,0.00015600811,0.000094684634,0.00016359883,0.0005238283,0.000058239737],"domain_scores_gemma":[0.99609345,0.0017486241,0.0004438057,0.00077596057,0.0008321444,0.000105955536],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0015803837,0.00055617816,0.000410725,0.0042593507,0.00030370883,0.0020090158,0.00063245476,0.0003610718,0.0041875257],"category_scores_gemma":[0.0067209005,0.00040679757,0.00037845693,0.0031194643,0.00039371275,0.0020497737,0.0016748473,0.00075655937,0.0012397375],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00025200783,0.00026142737,0.024734812,0.00030186135,0.00009001765,0.00022873387,0.0013048078,0.024827302,0.011698744,0.021113804,0.0133281,0.9018584],"study_design_scores_gemma":[0.00011947301,0.00032784636,0.06593148,0.00038604994,0.0001067476,0.0006731694,0.0015255457,0.67255896,0.04163695,0.06750319,0.14898713,0.00024343755],"about_ca_topic_score_codex":0.0029706568,"about_ca_topic_score_gemma":0.0046924623,"teacher_disagreement_score":0.0042593507,"about_ca_system_score_codex":0.00052273355,"about_ca_system_score_gemma":0.0010799957,"threshold_uncertainty_score":0.014008641},"labels":[],"label_agreement":null},{"id":"W7128087951","doi":"10.22260/crc-csce-2025/0184","title":"Assessing the Impact of Prefabrication on the Carbon Footprint of Multi-Story Residential Construction","year":2025,"lang":"","type":"article","venue":"","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Carbon footprint; Prefabrication; Life-cycle assessment; Footprint; Construction industry; Environmental impact assessment","score_opus":0.020971428580895127,"score_gpt":0.29800944915881816,"score_spread":0.27703802057792304,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128087951","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9877015,0.0016176687,0.00092621066,0.00007770565,0.0000049704518,0.00013587734,0.0003701276,0.000008711759,0.009157221],"genre_scores_gemma":[0.99419796,0.0015844302,0.0030911013,0.000024205152,0.0000037485866,0.00006483494,0.0002666822,0.0000067806377,0.00076011283],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9976265,0.0007510551,0.00012511319,0.0001361878,0.0011491213,0.00021215455],"domain_scores_gemma":[0.991816,0.004507645,0.001199481,0.00018443665,0.002132119,0.00016038427],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0032273568,0.00051577896,0.00030727632,0.002999069,0.0009954575,0.0018305392,0.00062988437,0.0005628464,0.0014927208],"category_scores_gemma":[0.005532926,0.00021091665,0.0004627107,0.00415896,0.0007013538,0.0010190518,0.000943764,0.0003350782,0.00017316513],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0010608848,0.0005572813,0.54406035,0.009101972,0.00066096016,0.004037262,0.03678054,0.01436754,0.032673705,0.0033775608,0.0012010176,0.3521209],"study_design_scores_gemma":[0.000012758058,0.0013453879,0.9324899,0.00089049205,0.00048796428,0.0006485954,0.03564006,0.0031897975,0.013340958,0.0005726155,0.011309169,0.00007235304],"about_ca_topic_score_codex":0.044519532,"about_ca_topic_score_gemma":0.1890363,"teacher_disagreement_score":0.044519532,"about_ca_system_score_codex":0.0035038218,"about_ca_system_score_gemma":0.0026364594,"threshold_uncertainty_score":0.088520825},"labels":[],"label_agreement":null},{"id":"W7128178412","doi":"10.36680/j.itcon.2025.046","title":"Decentralized and Collaborative Information Management System in Construction Contract Administration: A change management case study","year":2025,"lang":"","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Toronto Metropolitan University; University of Toronto","funders":"","keywords":"Smart contract; Ontology; Information management; Context (archaeology); Information system; Process (computing); Management information systems; Blockchain; Information security management","score_opus":0.005514737249226615,"score_gpt":0.23691177977933375,"score_spread":0.23139704253010715,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7128178412","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.78964716,0.0005392965,0.14183393,0.0045123687,0.00012235378,0.0018098538,0.00040803014,0.0007424403,0.060384545],"genre_scores_gemma":[0.917449,0.00022676887,0.07317418,0.0001765436,0.000034561028,0.00034910114,0.0003185401,0.00005555382,0.008215602],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.99376184,0.0030587516,0.00036569362,0.0005038409,0.0016978671,0.00061201904],"domain_scores_gemma":[0.99322426,0.0030339414,0.0005606416,0.0012073814,0.0010434058,0.00093051203],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0054459088,0.00029326713,0.00043395796,0.001593202,0.0043501365,0.0035970341,0.001697253,0.0032307336,0.00322012],"category_scores_gemma":[0.006984359,0.00030385857,0.00060003664,0.002339665,0.0022571727,0.0035099452,0.002904921,0.0015555655,0.00060582045],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0014014324,0.0055569443,0.08225783,0.0010692629,0.000204181,0.03862932,0.05071795,0.15180536,0.029224258,0.25817758,0.02408016,0.35687575],"study_design_scores_gemma":[0.00036675343,0.001226823,0.025540115,0.00033993306,0.00015412772,0.007161276,0.029148772,0.6271338,0.026218902,0.035441954,0.24698369,0.00028397542],"about_ca_topic_score_codex":0.015547107,"about_ca_topic_score_gemma":0.015435107,"teacher_disagreement_score":0.015547107,"about_ca_system_score_codex":0.004263088,"about_ca_system_score_gemma":0.004573966,"threshold_uncertainty_score":0.030930996},"labels":[],"label_agreement":null},{"id":"W7133056146","doi":"","title":"Defining a value map for communication technologies in the Canadian construction industry","year":2007,"lang":"","type":"dissertation","venue":"TSpace","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Information and Communications Technology; Usability; Construction industry; Value (mathematics); Information technology; Industry 4.0","score_opus":0.0160409491152078,"score_gpt":0.3065002757996275,"score_spread":0.2904593266844197,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7133056146","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.6254198,0.0011920827,0.06598898,0.00783064,0.00004882665,0.00076438073,0.0017775757,0.00013189849,0.29684582],"genre_scores_gemma":[0.9677793,0.00062149536,0.026406338,0.00008090564,0.0000036808408,0.0001624324,0.0003628045,0.000018151093,0.0045648804],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"qualitative","domain_scores_codex":[0.9978842,0.00041723324,0.00006477263,0.000121253084,0.0010396128,0.0004728925],"domain_scores_gemma":[0.99778533,0.0006427034,0.0001536424,0.00006950215,0.0011995166,0.00014915295],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0018290675,0.00058672455,0.0002830143,0.0088880155,0.0058629257,0.009047514,0.00094229134,0.00085161306,0.0030571613],"category_scores_gemma":[0.0055940826,0.0004058571,0.0004781876,0.008270158,0.0038487671,0.0037953425,0.0023168263,0.000888338,0.00027902465],"study_design_candidate":"qualitative","study_design_consensus":null,"about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008151432,0.00015727349,0.060176753,0.00039309319,0.00003620144,0.0006334342,0.045180105,0.0144405365,0.002174019,0.6640747,0.0082465755,0.20440564],"study_design_scores_gemma":[0.000038903734,0.00015994154,0.19387813,0.001376279,0.000117678916,0.0006672626,0.24768893,0.096915856,0.0043291287,0.22798203,0.22652276,0.00032306663],"about_ca_topic_score_codex":0.8052943,"about_ca_topic_score_gemma":0.827889,"teacher_disagreement_score":0.19470572,"about_ca_system_score_codex":0.056594875,"about_ca_system_score_gemma":0.036805462,"threshold_uncertainty_score":0.41062653},"labels":[],"label_agreement":null},{"id":"W7134389162","doi":"","title":"ICSC’15 : The CSCE International Construction Specialty Conference, Vancouver, June 7 - 10, 2015","year":2015,"lang":"en","type":"article","venue":"cIRcle (University of British Columbia)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Specialty; Construction industry; Foundation (evidence)","score_opus":0.009659134947691678,"score_gpt":0.17028031797284857,"score_spread":0.16062118302515688,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7134389162","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.06973096,0.027399449,0.064027295,0.047345635,0.07316764,0.0016763975,0.016035797,0.008029234,0.6925876],"genre_scores_gemma":[0.08329684,0.006327785,0.01588178,0.0014609502,0.0014164008,0.0004031338,0.017020633,0.0014317764,0.8727608],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9975078,0.0003558852,0.000079497,0.00022408034,0.0013343125,0.00049834425],"domain_scores_gemma":[0.9948961,0.00026493086,0.00008188826,0.00032667984,0.0028868795,0.0015435901],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.007738899,0.0015127013,0.0014731832,0.0024784955,0.004908186,0.008056338,0.0017335461,0.002256711,0.06587483],"category_scores_gemma":[0.0037730036,0.0006794775,0.0006735092,0.0020749094,0.0024963017,0.0020233593,0.0044693537,0.0033596714,0.03242903],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00020892991,0.00026573063,0.0024614756,0.00019006965,0.0000274643,0.00009294847,0.00058866065,0.0013852444,0.001815503,0.0031142686,0.9212969,0.06855282],"study_design_scores_gemma":[0.000028368835,0.000100617406,0.007209208,0.00032845573,0.000019959567,0.000059545204,0.0015706597,0.0028811086,0.0019680273,0.0017653416,0.9840349,0.00003386803],"about_ca_topic_score_codex":0.1384512,"about_ca_topic_score_gemma":0.4685569,"teacher_disagreement_score":0.1384512,"about_ca_system_score_codex":0.006517579,"about_ca_system_score_gemma":0.018903077,"threshold_uncertainty_score":0.27529067},"labels":[],"label_agreement":null},{"id":"W7135408835","doi":"10.1201/9780367855192-8/towards-adopting-4d-bim-construction-management-curriculums-faris-elghaish-sepehr-abrishami-salam-al-bizri-saeed-talebi-sandra-matarneh-song-wu","title":"Towards adopting 4D BIM in construction management curriculums: A teaching map","year":2021,"lang":"en","type":"article","venue":"Research Portal (Queen's University Belfast)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"","funders":"Queen's University; Queen's University Belfast","keywords":"Construction management; Scheduling (production processes); Building information modeling; Pre-construction services; Project planning; Process (computing)","score_opus":0.01245791760387935,"score_gpt":0.24963125825996,"score_spread":0.23717334065608064,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7135408835","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09287402,0.00815707,0.42959693,0.0611787,0.0023315204,0.0012584586,0.0005279029,0.0029615567,0.4011137],"genre_scores_gemma":[0.18627279,0.007733401,0.7078569,0.002662769,0.0002106943,0.00056592125,0.0004143467,0.0003874548,0.093895815],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99817014,0.0007041549,0.00007875462,0.00016393569,0.00066362525,0.00021934925],"domain_scores_gemma":[0.998727,0.0003181578,0.00009119704,0.000116033574,0.00031153136,0.00043598097],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0036066058,0.00057135243,0.0003199714,0.0016126175,0.0023450258,0.00607,0.0012661212,0.0016834008,0.011837621],"category_scores_gemma":[0.0026032955,0.0006601423,0.00048558772,0.001763297,0.0021585708,0.0045530004,0.005130206,0.0028072977,0.004374257],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000046603334,0.00062932423,0.005111473,0.0009662793,0.0000067683436,0.0006008264,0.02848743,0.0025712755,0.0064521106,0.14330557,0.060053557,0.75176877],"study_design_scores_gemma":[0.000013022677,0.00012472553,0.0033906952,0.00078388373,0.000007760705,0.00042968075,0.011696811,0.0022294277,0.0027428942,0.025537454,0.9530118,0.00003187845],"about_ca_topic_score_codex":0.0059317104,"about_ca_topic_score_gemma":0.016844597,"teacher_disagreement_score":0.011837621,"about_ca_system_score_codex":0.0047412533,"about_ca_system_score_gemma":0.009035641,"threshold_uncertainty_score":0.03960085},"labels":[],"label_agreement":null},{"id":"W7154967786","doi":"10.66408/sasbe.2025.2630","title":"Evaluating the impact of public policies supporting digital transformation in the construction sector: towards a systematic evaluation framework","year":2025,"lang":"","type":"article","venue":"Proceedings of Smart and Sustainable Built Environment Conference Series","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":true,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"École de Technologie Supérieure","funders":"Natural Sciences and Engineering Research Council of Canada; Ministère de l'Education Nationale, de l'Enseignement Superieur et de la Recherche; Association Nationale de la Recherche et de la Technologie","keywords":"Hindsight bias; Digital transformation; Novelty; Relevance (law); Plan (archaeology); Asset (computer security); Public policy; Policy analysis; Order (exchange)","score_opus":0.02879598537940971,"score_gpt":0.29179433788017944,"score_spread":0.26299835250076975,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7154967786","genre_codex":"methods","genre_gemma":"methods","domain_codex":"methods","domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.09637917,0.05633005,0.683661,0.0262896,0.00091023697,0.058702365,0.0024600762,0.00057790737,0.074689664],"genre_scores_gemma":[0.48575297,0.012449744,0.45434418,0.0020130365,0.0001910906,0.04380185,0.00052153226,0.00009158017,0.0008340109],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"theoretical_or_conceptual","domain_scores_codex":[0.2973725,0.6244729,0.033026233,0.006541717,0.034289762,0.0042968923],"domain_scores_gemma":[0.2788233,0.63027346,0.028259639,0.017189734,0.0434546,0.0019993929],"candidate_categories":["metaresearch"],"consensus_categories":[],"category_scores_codex":[0.49403042,0.0042855255,0.005776773,0.022300337,0.0056104674,0.025707895,0.005354083,0.008113726,0.0038571295],"category_scores_gemma":[0.45353708,0.0019208037,0.0048976913,0.015435498,0.018299581,0.0183544,0.01342842,0.0065400954,0.00043245626],"study_design_candidate":"theoretical_or_conceptual","study_design_consensus":"theoretical_or_conceptual","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0011165439,0.0024533283,0.016831072,0.046627853,0.0036046738,0.00041433453,0.015792299,0.058374543,0.001873613,0.4375363,0.003643205,0.4117323],"study_design_scores_gemma":[0.0022994252,0.009033902,0.017755754,0.12481635,0.008316383,0.000356654,0.05161384,0.091913916,0.01663266,0.60932344,0.06722455,0.0007131981],"about_ca_topic_score_codex":0.008820301,"about_ca_topic_score_gemma":0.0097733075,"teacher_disagreement_score":0.49403042,"about_ca_system_score_codex":0.047808185,"about_ca_system_score_gemma":0.07738018,"threshold_uncertainty_score":0.6239506},"labels":[],"label_agreement":null},{"id":"W7164010638","doi":"10.5281/zenodo.20611807","title":"Cost Management Challenges in Indian Infrastructure Projects: A Study of Quantity Surveying Practices","year":2015,"lang":"en","type":"article","venue":"Open MIND","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Procurement; Mandate; Transparency (behavior); Government (linguistics); Integrated project delivery; Project management; Audit; Function (biology); Private sector","score_opus":0.21527014617506612,"score_gpt":0.35810336826380695,"score_spread":0.14283322208874083,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7164010638","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99591476,0.00010115699,0.0005414887,0.000506376,0.000005977316,0.000030717765,0.000030788564,0.0000073418555,0.0028614174],"genre_scores_gemma":[0.9979984,0.00029356137,0.00063588965,0.00014076124,0.000006465089,0.00004278825,0.00003263131,0.000012810646,0.0008366826],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99119776,0.003958124,0.00053418573,0.0006927403,0.0023589954,0.0012582258],"domain_scores_gemma":[0.97516227,0.009621609,0.007224759,0.0015955684,0.0041681263,0.0022277394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063972585,0.00026268774,0.00033380123,0.0028246427,0.0036571678,0.0045478037,0.0019380159,0.00074032106,0.0015036045],"category_scores_gemma":[0.025029542,0.0005913329,0.0003231169,0.005824196,0.0032862017,0.0025910854,0.0036150855,0.0014061943,0.0003154312],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009857069,0.00052442466,0.4145359,0.00040755115,0.00005319858,0.001831281,0.47980735,0.0007160335,0.0022144127,0.0065820822,0.003125891,0.09010326],"study_design_scores_gemma":[0.0000038400676,0.0002281653,0.3830001,0.00018430613,0.000025221141,0.0007610763,0.5964254,0.0010641778,0.0003948555,0.00085412513,0.016991064,0.00006767607],"about_ca_topic_score_codex":0.030404704,"about_ca_topic_score_gemma":0.03699628,"teacher_disagreement_score":0.030404704,"about_ca_system_score_codex":0.004815757,"about_ca_system_score_gemma":0.0070430897,"threshold_uncertainty_score":0.0604555},"labels":[],"label_agreement":null},{"id":"W7164038547","doi":"10.5281/zenodo.20611808","title":"Cost Management Challenges in Indian Infrastructure Projects: A Study of Quantity Surveying Practices","year":2015,"lang":"en","type":"article","venue":"Zenodo (CERN European Organization for Nuclear Research)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Impact","funders":"","keywords":"Procurement; Mandate; Transparency (behavior); Government (linguistics); Integrated project delivery; Project management; Audit; Function (biology); Private sector","score_opus":0.14947333313135405,"score_gpt":0.29389542420868703,"score_spread":0.14442209107733298,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W7164038547","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.99591476,0.00010115699,0.0005414887,0.000506376,0.000005977316,0.000030717765,0.000030788564,0.0000073418555,0.0028614174],"genre_scores_gemma":[0.9979984,0.00029356137,0.00063588965,0.00014076124,0.000006465089,0.00004278825,0.00003263131,0.000012810646,0.0008366826],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.99119776,0.003958124,0.00053418573,0.0006927403,0.0023589954,0.0012582258],"domain_scores_gemma":[0.97516227,0.009621609,0.007224759,0.0015955684,0.0041681263,0.0022277394],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0063972585,0.00026268774,0.00033380123,0.0028246427,0.0036571678,0.0045478037,0.0019380159,0.00074032106,0.0015036045],"category_scores_gemma":[0.025029542,0.0005913329,0.0003231169,0.005824196,0.0032862017,0.0025910854,0.0036150855,0.0014061943,0.0003154312],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00009857069,0.00052442466,0.4145359,0.00040755115,0.00005319858,0.001831281,0.47980735,0.0007160335,0.0022144127,0.0065820822,0.003125891,0.09010326],"study_design_scores_gemma":[0.0000038400676,0.0002281653,0.3830001,0.00018430613,0.000025221141,0.0007610763,0.5964254,0.0010641778,0.0003948555,0.00085412513,0.016991064,0.00006767607],"about_ca_topic_score_codex":0.030404704,"about_ca_topic_score_gemma":0.03699628,"teacher_disagreement_score":0.030404704,"about_ca_system_score_codex":0.004815757,"about_ca_system_score_gemma":0.0070430897,"threshold_uncertainty_score":0.0604555},"labels":[],"label_agreement":null},{"id":"W755791061","doi":"","title":"MJM ACOUSTICAL CONSULTANTS INC.","year":2015,"lang":"en","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Variety (cybernetics); Engineering; Telecommunications; Engineering management; Business; Computer science; Artificial intelligence","score_opus":0.01599763348686804,"score_gpt":0.204398899142538,"score_spread":0.18840126565566997,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W755791061","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0020161155,0.0033370394,0.005636638,0.005323961,0.0014321248,0.00019171121,0.0016525366,0.0031645508,0.9772454],"genre_scores_gemma":[0.008170573,0.0012297288,0.0031402193,0.00046879463,0.000108490734,0.00004823774,0.00089169946,0.00040634008,0.98553586],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9953767,0.00016474853,0.00010464357,0.00040261267,0.0036672514,0.00028400833],"domain_scores_gemma":[0.9954809,0.0001820991,0.00013056802,0.00021383713,0.002976679,0.0010159443],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0013908201,0.0010813047,0.00051580253,0.002388827,0.003558598,0.0035059068,0.0016096246,0.0016923943,0.555717],"category_scores_gemma":[0.0038617565,0.00087085686,0.00036195494,0.0019204299,0.0009001786,0.0016048409,0.0027213022,0.0014863393,0.2391383],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000052052128,0.00004523514,0.00055576547,0.00021520817,0.0000030045912,0.0002727581,0.00023852519,0.00014780395,0.002474932,0.0061900117,0.7366518,0.2531529],"study_design_scores_gemma":[0.0000060784646,0.000012010159,0.0007001439,0.000031510357,0.0000029745943,0.0002172552,0.00009294438,0.00015582603,0.00028378502,0.00026292322,0.9982278,0.000006756855],"about_ca_topic_score_codex":0.12796818,"about_ca_topic_score_gemma":0.34405687,"teacher_disagreement_score":0.555717,"about_ca_system_score_codex":0.0040526437,"about_ca_system_score_gemma":0.01506103,"threshold_uncertainty_score":0.63371575},"labels":[],"label_agreement":null},{"id":"W765355923","doi":"","title":"Topping it up down in NOLA","year":2015,"lang":"en","type":"article","venue":"Roads & bridges/Roads & bridges (Des Plaines, Ill. Online)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Downtown; Tourism; Quarter (Canadian coin); Engineering; Overlay; Civil engineering; Hospitality; Topping; Waterfall; Forensic engineering; Business; Transport engineering; Geography; Archaeology; Computer science","score_opus":0.03018245851670254,"score_gpt":0.2524007889396691,"score_spread":0.22221833042296657,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W765355923","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.037192825,0.00085504504,0.004048691,0.010998872,0.004101612,0.00016260425,0.0010905854,0.0016289628,0.9399208],"genre_scores_gemma":[0.10377235,0.0004097717,0.007877196,0.002203241,0.00021715625,0.00007906775,0.0008452078,0.00048662059,0.88410944],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9996463,0.000029271723,0.000011081013,0.000078669014,0.000113217066,0.00012139945],"domain_scores_gemma":[0.9995679,0.000026037462,0.000014732492,0.00003067705,0.00016293587,0.00019774669],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0003513631,0.00038057053,0.00029170385,0.0011098022,0.0071130493,0.0028440915,0.00058612286,0.000942748,0.12694679],"category_scores_gemma":[0.00081908633,0.0002535958,0.00043060636,0.00071469037,0.0010691981,0.0013148154,0.0035210587,0.0013774368,0.032728728],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0004389547,0.0004658344,0.015563815,0.0003383981,0.00002468633,0.00401223,0.015515647,0.00037185333,0.015115571,0.0480765,0.5318947,0.3681818],"study_design_scores_gemma":[0.000005188765,0.000043203538,0.0044109006,0.000062308456,0.0000049119585,0.0002245327,0.0030116022,0.000079563564,0.00046861748,0.0008051326,0.9908687,0.000015315896],"about_ca_topic_score_codex":0.039833862,"about_ca_topic_score_gemma":0.18116519,"teacher_disagreement_score":0.12694679,"about_ca_system_score_codex":0.002108645,"about_ca_system_score_gemma":0.0028235565,"threshold_uncertainty_score":0.42467934},"labels":[],"label_agreement":null},{"id":"W803883628","doi":"","title":"On-site labor productivity estimation using neural networks","year":2005,"lang":"en","type":"dissertation","venue":"Spectrum Research Repository (Concordia University)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":8,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Artificial neural network; Productivity; Sampling (signal processing); Engineering; Estimation; Work (physics); Software; Field (mathematics); Industrial engineering; Computer science; Operations research; Data mining; Machine learning; Telecommunications; Systems engineering; Mathematics; Economics","score_opus":0.015707014620038234,"score_gpt":0.25530611182818647,"score_spread":0.23959909720814823,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W803883628","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.8307761,0.00020087176,0.1626687,0.00012476897,0.000021506714,0.00008538449,0.00033131847,0.00032173842,0.005469569],"genre_scores_gemma":[0.98184425,0.00014109863,0.01604557,0.000010498242,0.00000851592,0.0000512085,0.00027261666,0.000012951242,0.001613396],"study_design_codex":"simulation_or_modeling","study_design_gemma":"simulation_or_modeling","domain_scores_codex":[0.9994832,0.00018025677,0.000021183112,0.000106354746,0.00014344759,0.00006548409],"domain_scores_gemma":[0.99878675,0.00074717175,0.00014264803,0.00006303234,0.00023073188,0.000029690777],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0008158385,0.0007573759,0.0004670083,0.0012458432,0.00024477433,0.0008814524,0.00080090744,0.00057974574,0.0013031084],"category_scores_gemma":[0.0042424495,0.00032331317,0.00039883915,0.0016243607,0.00017926676,0.0008967624,0.00042515947,0.00041990003,0.00028611498],"study_design_candidate":"simulation_or_modeling","study_design_consensus":"simulation_or_modeling","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00017648796,0.0002729844,0.03518885,0.00006187357,0.000094190036,0.00005727961,0.00013946256,0.8473133,0.0010686906,0.0007260158,0.0004874165,0.11441352],"study_design_scores_gemma":[0.0000034236716,0.000027037111,0.0062783067,0.000006642134,0.0000075339203,0.0000054140014,0.000046156754,0.99269307,0.00050532405,0.00030959217,0.00011251667,0.0000049189007],"about_ca_topic_score_codex":0.038094614,"about_ca_topic_score_gemma":0.03596804,"teacher_disagreement_score":0.038094614,"about_ca_system_score_codex":0.0014781872,"about_ca_system_score_gemma":0.00065402273,"threshold_uncertainty_score":0.07574576},"labels":[],"label_agreement":null},{"id":"W817391689","doi":"","title":"The use of cemented scrap tire shreds as highway sub-base","year":2006,"lang":"en","type":"article","venue":"Canadian Geotechnical Journal","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Scrap; Geotechnical engineering; Base (topology); Road construction; Forensic engineering; Geology; Engineering; Mining engineering; Civil engineering; Mathematics","score_opus":0.012643443288493568,"score_gpt":0.18793380865781922,"score_spread":0.17529036536932566,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W817391689","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9786702,0.00023055283,0.0031027307,0.00007225212,0.000021533942,0.00004082533,0.000091534486,0.00006738827,0.017702928],"genre_scores_gemma":[0.9876473,0.00016520018,0.007383314,0.000015571952,0.0000024353171,0.0000064832066,0.00006178988,0.00001962638,0.0046983305],"study_design_codex":"design_other","study_design_gemma":"bench_or_experimental","domain_scores_codex":[0.99949,0.00010226233,0.000013136836,0.000075371514,0.00022249194,0.00009675403],"domain_scores_gemma":[0.9994825,0.00008911887,0.000041906027,0.0001279194,0.00018884573,0.000069608956],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0006031702,0.0002839091,0.00016317754,0.0007973729,0.0009373713,0.0009441152,0.00074140594,0.00039984667,0.0026810954],"category_scores_gemma":[0.0010040576,0.00017675036,0.00028812312,0.00055632455,0.00045011667,0.00062789465,0.00067316066,0.00034897603,0.0007929761],"study_design_candidate":"bench_or_experimental","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0016619889,0.000825343,0.04968158,0.0004663882,0.00010546803,0.0023807788,0.0035880287,0.016388232,0.23534775,0.005733585,0.0029249848,0.6808958],"study_design_scores_gemma":[0.00015267964,0.007246606,0.34498557,0.00034141506,0.0008972304,0.0054371217,0.024859408,0.06359673,0.39932093,0.0037346883,0.14917818,0.00024949166],"about_ca_topic_score_codex":0.011885138,"about_ca_topic_score_gemma":0.070395865,"teacher_disagreement_score":0.011885138,"about_ca_system_score_codex":0.0006065646,"about_ca_system_score_gemma":0.001500117,"threshold_uncertainty_score":0.02363193},"labels":[],"label_agreement":null},{"id":"W818459361","doi":"","title":"Paying for It: Cost to be a Contractor","year":2007,"lang":"en","type":"article","venue":"Roads & bridges/Roads & bridges (Des Plaines, Ill. Online)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Economic shortage; Bidding; Quarter (Canadian coin); Truck; Operations management; Business; Cost estimate; Economics; Engineering; Actuarial science; Marketing; Government (linguistics)","score_opus":0.029574928567889243,"score_gpt":0.27794362697495856,"score_spread":0.24836869840706932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W818459361","genre_codex":"other","genre_gemma":"commentary","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"commentary","genre_consensus":null,"domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.047280453,0.002396079,0.015105627,0.04778255,0.004069391,0.00052659574,0.0007616895,0.0011693008,0.88090825],"genre_scores_gemma":[0.42670467,0.0030295036,0.013920083,0.015843488,0.0018652593,0.0002790353,0.0015389123,0.0006720042,0.53614706],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9918538,0.0015817891,0.00044140054,0.00044458132,0.004320778,0.0013577209],"domain_scores_gemma":[0.9856209,0.0027922431,0.0009304069,0.0016465738,0.0039943764,0.005015432],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0038897549,0.0005002465,0.00042937827,0.0013044061,0.0047437274,0.004895786,0.0012268767,0.0017651366,0.139837],"category_scores_gemma":[0.019108953,0.00034524957,0.0006340753,0.00077598944,0.0011208807,0.0032168834,0.0029307003,0.0028760443,0.035276752],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00008743143,0.0004237489,0.014781673,0.00012311868,0.00003621892,0.000819848,0.0011105668,0.0006516969,0.001006833,0.030551655,0.48201925,0.46838802],"study_design_scores_gemma":[0.000025944497,0.00034840527,0.029658016,0.00037487902,0.000038291626,0.0062154164,0.004954204,0.0014859352,0.00045774807,0.008196619,0.9481339,0.00011071347],"about_ca_topic_score_codex":0.013807183,"about_ca_topic_score_gemma":0.013035856,"teacher_disagreement_score":0.139837,"about_ca_system_score_codex":0.003983984,"about_ca_system_score_gemma":0.008851625,"threshold_uncertainty_score":0.46780133},"labels":[],"label_agreement":null},{"id":"W850345497","doi":"","title":"MJM CONSEILLERS EN ACOUSTIQUE INC.","year":2015,"lang":"fr","type":"article","venue":"Canadian acoustics","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":true,"route_about_ca":false,"ca_institutions":"","funders":"","keywords":"Political science; Humanities; Art","score_opus":0.013172365155097133,"score_gpt":0.2072017119196931,"score_spread":0.194029346764596,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W850345497","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.02462198,0.01055734,0.053215086,0.03159188,0.0081853755,0.00041697285,0.0019848603,0.004691285,0.86473525],"genre_scores_gemma":[0.029571425,0.0018283236,0.017880056,0.0009742591,0.00040203406,0.00012704934,0.00056616735,0.0005506632,0.94810003],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99198043,0.0003744555,0.00020865013,0.00071728724,0.006212644,0.00050660054],"domain_scores_gemma":[0.9892301,0.00096305995,0.0005448574,0.0007045669,0.0058489544,0.0027084954],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00537996,0.0009773858,0.0005571093,0.0026771342,0.0037023353,0.0034466984,0.001380496,0.0021861224,0.20244005],"category_scores_gemma":[0.0076639815,0.0007198732,0.00039785547,0.0017307987,0.0014128663,0.0019308141,0.0033218388,0.0020830492,0.05418358],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00034002328,0.00019073325,0.004427505,0.00040751888,0.000014681716,0.0005030579,0.0026754634,0.0005211347,0.021182531,0.03745452,0.45371708,0.47856572],"study_design_scores_gemma":[0.000005459467,0.0000400155,0.002446108,0.000040006074,0.000003735773,0.00017442735,0.00027562838,0.00032696646,0.0012815737,0.00048054793,0.9949137,0.000011923219],"about_ca_topic_score_codex":0.094993375,"about_ca_topic_score_gemma":0.2393012,"teacher_disagreement_score":0.20244005,"about_ca_system_score_codex":0.0041028857,"about_ca_system_score_gemma":0.017243238,"threshold_uncertainty_score":0.6772294},"labels":[],"label_agreement":null},{"id":"W850660147","doi":"","title":"TTC STREAMLINES M/W PLANNING","year":2002,"lang":"en","type":"article","venue":"Railway track and structures","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Track (disk drive); Work (physics); Software; Commission; Work order; Transport engineering; Engineering; Order (exchange); Transit (satellite); Computer science; Software engineering; Engineering management; Systems engineering; Reliability engineering; Business; Public transport; Operating system","score_opus":0.013470655638491237,"score_gpt":0.21053864649934587,"score_spread":0.19706799086085464,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W850660147","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.011320428,0.0007352933,0.02159148,0.0021842618,0.00043092863,0.00068409275,0.023607044,0.007738532,0.9317079],"genre_scores_gemma":[0.07505574,0.0010630005,0.029134668,0.0003080669,0.000082684826,0.00019945987,0.023642033,0.0019873744,0.8685269],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9993154,0.000048600567,0.000019347164,0.000065888125,0.00045061592,0.00010020789],"domain_scores_gemma":[0.99861944,0.000057082878,0.00005303045,0.00012729997,0.00095359597,0.00018969378],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005919845,0.0007534985,0.00022365765,0.0025241768,0.001825451,0.0033444595,0.0008496026,0.0005071575,0.15181528],"category_scores_gemma":[0.0013730885,0.0005645106,0.00032466452,0.0030187126,0.00045325072,0.00078892073,0.0006785493,0.0006996345,0.030474363],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000100284495,0.00004359665,0.0035198592,0.00010602048,0.000008022251,0.00014979286,0.00024415273,0.007386868,0.0013858101,0.01951055,0.8146211,0.15292393],"study_design_scores_gemma":[0.000019597699,0.00002525506,0.0030017714,0.00004041833,0.000006360749,0.000029690098,0.00012863895,0.008420069,0.0011269376,0.0010533014,0.9861325,0.000015445237],"about_ca_topic_score_codex":0.7595303,"about_ca_topic_score_gemma":0.84311473,"teacher_disagreement_score":0.7595303,"about_ca_system_score_codex":0.012401929,"about_ca_system_score_gemma":0.023830857,"threshold_uncertainty_score":0.5078727},"labels":[],"label_agreement":null},{"id":"W852836758","doi":"10.1044/leader.an1.17062012.1","title":"ASHA Members: 150,000 Strong and Growing","year":2012,"lang":"en","type":"article","venue":"ASHA Leader","topic":"BIM and Construction Integration","field":"Engineering","cited_by":5,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Asha; American Speech-Language-Hearing Association; Population; Psychological intervention; Psychology; Medical education; Medicine; Political science; Linguistics; Environmental health; Psychiatry","score_opus":0.01717456596533274,"score_gpt":0.22009314586421852,"score_spread":0.2029185798988858,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W852836758","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0029599625,0.0019315364,0.00091491744,0.021105804,0.028067704,0.0007860514,0.0063064587,0.0046102726,0.93331736],"genre_scores_gemma":[0.0022824653,0.0007559503,0.00038879784,0.005495579,0.0016152203,0.00020728825,0.0016198389,0.0006156679,0.98701906],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9979988,0.0001745241,0.000075557444,0.00026695096,0.0010066384,0.00047753315],"domain_scores_gemma":[0.9919205,0.00018623212,0.0001837261,0.00031995247,0.0024828652,0.004906792],"candidate_categories":["insufficient_payload"],"consensus_categories":[],"category_scores_codex":[0.0018097898,0.0013144835,0.00085532956,0.001791645,0.0063924566,0.0115929255,0.001484092,0.0035821046,0.70838255],"category_scores_gemma":[0.0043709297,0.000994018,0.0009618761,0.0016463381,0.0008917901,0.006073693,0.0077820015,0.0040460536,0.7473988],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000086779955,0.000028623148,0.00010744522,0.000024680085,9.048208e-7,0.000021407062,0.000030548847,0.000004559883,0.00008835986,0.00018521155,0.98702383,0.012475786],"study_design_scores_gemma":[0.000007028105,0.000009197541,0.0004212074,0.00003461942,0.0000012560073,0.000024801622,0.00013001666,0.0000099650215,0.000044681598,0.000063423344,0.9992483,0.0000055174482],"about_ca_topic_score_codex":0.006362666,"about_ca_topic_score_gemma":0.021222308,"teacher_disagreement_score":0.70838255,"about_ca_system_score_codex":0.0013554759,"about_ca_system_score_gemma":0.0048538437,"threshold_uncertainty_score":0.41595685},"labels":[],"label_agreement":null},{"id":"W89732604","doi":"10.22260/isarc2013/0086","title":"Impact of Building Information Modeling on Just-in-Time Material Delivery","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":11,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Concordia University","funders":"","keywords":"Material flow; Computer science; Materials management; Building information modeling; Delivery Performance; Scheduling (production processes); Productivity; Process (computing); Manufacturing engineering; Reliability engineering; Process management; Operations management; Engineering","score_opus":0.006797903422808936,"score_gpt":0.19939720260744584,"score_spread":0.1925992991846369,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W89732604","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.70846224,0.0019030548,0.23085831,0.002436879,0.00020145671,0.0005541246,0.0012430808,0.0018478007,0.05249299],"genre_scores_gemma":[0.9282246,0.0005913888,0.068826154,0.00008966235,0.000012840618,0.00009494087,0.00043562028,0.00018260043,0.0015421812],"study_design_codex":"simulation_or_modeling","study_design_gemma":"observational","domain_scores_codex":[0.9854224,0.00756823,0.0005487832,0.00045336183,0.005419396,0.00058782037],"domain_scores_gemma":[0.9466726,0.040920038,0.0034902408,0.004638397,0.003797356,0.00048135765],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.010653651,0.0012187453,0.0008926862,0.0023491124,0.00075149647,0.005003654,0.0010718829,0.0010597592,0.00422262],"category_scores_gemma":[0.03377897,0.0007437443,0.0009780439,0.0027627125,0.0009153399,0.0041896696,0.0020854233,0.0010657954,0.00056313886],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00085025735,0.0004702764,0.016817303,0.0004346812,0.00014830836,0.00025088535,0.0004992112,0.8348531,0.006356762,0.016370317,0.0011874206,0.12176155],"study_design_scores_gemma":[0.00006247356,0.00089960266,0.011279006,0.00019511962,0.0001689525,0.00028823447,0.0010525989,0.95346904,0.016532786,0.007664604,0.0082749985,0.00011255735],"about_ca_topic_score_codex":0.0091119185,"about_ca_topic_score_gemma":0.0064053778,"teacher_disagreement_score":0.010653651,"about_ca_system_score_codex":0.0030101603,"about_ca_system_score_gemma":0.002577044,"threshold_uncertainty_score":0.056342542},"labels":[],"label_agreement":null},{"id":"W92521098","doi":"","title":"Preventing Foreign Object Debris and Improving Pavement Life-Cycle Costs Through Effective Fast-Track Concrete Repair","year":2007,"lang":"en","type":"article","venue":"Transportation Research Board 86th Annual MeetingTransportation Research Board","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Product (mathematics); Track (disk drive); Runway; Transport engineering; Engineering; Forensic engineering; Environmental science; Civil engineering; Geography; Mathematics","score_opus":0.018014739981929366,"score_gpt":0.31210510972536,"score_spread":0.2940903697434306,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W92521098","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9694577,0.00072227954,0.026573619,0.00007041225,0.000009538,0.000079867634,0.00007273473,0.000089723624,0.0029240511],"genre_scores_gemma":[0.9821264,0.0003000126,0.01623782,0.000009400672,0.0000030356782,0.000017872562,0.00008199916,0.000010916729,0.0012124408],"study_design_codex":"design_other","study_design_gemma":"observational","domain_scores_codex":[0.9993075,0.00015028042,0.000030269983,0.00005628705,0.00036900997,0.00008664935],"domain_scores_gemma":[0.99905056,0.00015259652,0.00041860543,0.000080635495,0.00024327714,0.000054311105],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.00073933514,0.000414891,0.00026761726,0.001081723,0.0002615013,0.0006951397,0.0005142027,0.00040099755,0.0016331715],"category_scores_gemma":[0.0012245715,0.00018072024,0.00030955393,0.000503927,0.0002230003,0.000887596,0.0002936538,0.00019748625,0.00034778088],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0005347813,0.0017439876,0.08978939,0.00074097316,0.00010478275,0.00036936998,0.0003197698,0.18197101,0.27704096,0.0022412238,0.0011337586,0.44401005],"study_design_scores_gemma":[0.000102942344,0.008450269,0.38579354,0.00017505906,0.0003107069,0.0012763888,0.0020062956,0.17151877,0.4134479,0.002026713,0.014769292,0.0001221559],"about_ca_topic_score_codex":0.0035190631,"about_ca_topic_score_gemma":0.014047049,"teacher_disagreement_score":0.0035190631,"about_ca_system_score_codex":0.0005417644,"about_ca_system_score_gemma":0.0012067248,"threshold_uncertainty_score":0.006997168},"labels":[],"label_agreement":null},{"id":"W93545470","doi":"10.22260/isarc2013/0105","title":"Surveying BIM in the Lebanese Construction Industry","year":2013,"lang":"en","type":"article","venue":"Proceedings of the ... ISARC","topic":"BIM and Construction Integration","field":"Engineering","cited_by":19,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Building information modeling; Work (physics); Construction industry; Productivity; Engineering management; Engineering; Business; Construction engineering; Operations management","score_opus":0.009791153595248936,"score_gpt":0.19120088503349825,"score_spread":0.18140973143824932,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W93545470","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.98464715,0.0025899068,0.0024704356,0.00081474124,0.00003817459,0.00010151815,0.00037809828,0.000027142814,0.00893278],"genre_scores_gemma":[0.9889916,0.003603336,0.0031513746,0.00023678514,0.000027157326,0.00013864793,0.0005629901,0.000013439326,0.0032746792],"study_design_codex":"observational","study_design_gemma":"observational","domain_scores_codex":[0.9974612,0.0009672828,0.00019002821,0.00017876952,0.0008415006,0.00036120493],"domain_scores_gemma":[0.996167,0.0010891334,0.0005769491,0.00011118026,0.0018924425,0.00016332966],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0045037214,0.00031301574,0.00025586368,0.00602081,0.0014342456,0.0017878473,0.0004701848,0.0005966997,0.0028770838],"category_scores_gemma":[0.004231656,0.00021758466,0.00020128551,0.0055117956,0.00073393155,0.0018072444,0.002016174,0.0003823238,0.0006636319],"study_design_candidate":"observational","study_design_consensus":"observational","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.00019845662,0.0003380416,0.5246181,0.0010840098,0.00004810131,0.0019327413,0.060522743,0.0011705252,0.0072458694,0.0053080865,0.007836939,0.38969633],"study_design_scores_gemma":[0.000009717157,0.00030974945,0.55791396,0.0010747452,0.000026195268,0.0010003054,0.32061204,0.0022337444,0.0042402823,0.0011921491,0.111311756,0.00007539393],"about_ca_topic_score_codex":0.012523856,"about_ca_topic_score_gemma":0.016245773,"teacher_disagreement_score":0.012523856,"about_ca_system_score_codex":0.0022144555,"about_ca_system_score_gemma":0.0020393808,"threshold_uncertainty_score":0.024901927},"labels":[],"label_agreement":null},{"id":"W958625388","doi":"","title":"Editorial: special issue on use of virtual world technology in architecture, engineering and construction","year":2011,"lang":"en","type":"editorial","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":1,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Metaverse; Virtual world; Architecture; Virtual reality; Dominance (genetics); Visualization; Computer science; Engineering; World Wide Web; Multimedia; Human–computer interaction; Geography","score_opus":0.003383589176464001,"score_gpt":0.18733492069947855,"score_spread":0.18395133152301454,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W958625388","genre_codex":"editorial","genre_gemma":"editorial","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"editorial","genre_consensus":"editorial","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.000049179056,0.002722837,0.00007712074,0.01146834,0.9833304,0.000022669541,0.00004300705,0.00003992959,0.0022464842],"genre_scores_gemma":[0.0003987175,0.0036382284,0.000082663624,0.0051125525,0.9774671,0.000024031928,0.000049187915,0.00003257165,0.013194873],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.99576205,0.0004527455,0.000510545,0.00046383668,0.002491244,0.00031959268],"domain_scores_gemma":[0.98640245,0.0040760715,0.0008798095,0.0003693867,0.0062276465,0.0020447571],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0041444073,0.0047039567,0.0040275054,0.0043997806,0.0033476667,0.0081099775,0.0032660365,0.011536879,0.021342587],"category_scores_gemma":[0.012607283,0.0011384457,0.0028884038,0.0021477563,0.0019714688,0.0049765473,0.0014206892,0.012097263,0.015529871],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000028437442,0.000020544367,0.000028043165,0.0001825828,0.000011179827,0.000114408525,0.000011112308,0.000027504537,0.00006296344,0.00015750703,0.99406505,0.0052905423],"study_design_scores_gemma":[0.00003906386,0.000045580295,0.00046558052,0.00041201484,0.00003935721,0.00031823316,0.00005859036,0.0001376327,0.00014782684,0.00057735667,0.99774194,0.000016851398],"about_ca_topic_score_codex":0.0014578716,"about_ca_topic_score_gemma":0.0043929433,"teacher_disagreement_score":0.021342587,"about_ca_system_score_codex":0.002852492,"about_ca_system_score_gemma":0.002827048,"threshold_uncertainty_score":0.07139802},"labels":[],"label_agreement":null},{"id":"W967810751","doi":"","title":"Truck+ for earthmoving operations","year":2014,"lang":"en","type":"article","venue":"Journal of Information Technology in Construction","topic":"BIM and Construction Integration","field":"Engineering","cited_by":33,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Truck; Global Positioning System; Interface (matter); Graphical user interface; Application programming interface; Geographic information system; Software; Component Object Model; User interface; Engineering; Tracking system; Computer science; Web application; Database; World Wide Web; Operating system; Automotive engineering","score_opus":0.0032874263430774527,"score_gpt":0.1929169950006865,"score_spread":0.18962956865760902,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W967810751","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.035450656,0.0003751084,0.5110076,0.00021829606,0.00020801272,0.0008283234,0.014587581,0.38046324,0.056861173],"genre_scores_gemma":[0.3888572,0.00097496365,0.4201331,0.00042739534,0.00018616427,0.0010647,0.05956438,0.021540517,0.107251614],"study_design_codex":"design_other","study_design_gemma":"not_applicable","domain_scores_codex":[0.99950063,0.00005070683,0.000039659753,0.00013662514,0.00023163276,0.000040753723],"domain_scores_gemma":[0.9995084,0.00006914575,0.000055645123,0.00016464244,0.00015146699,0.00005080316],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0005362779,0.0010081807,0.0006130946,0.0010516173,0.00032228467,0.0010829902,0.0013500507,0.00044255456,0.03800084],"category_scores_gemma":[0.0008215268,0.00044356438,0.000563951,0.0009168267,0.00016772389,0.0013937671,0.0012503976,0.0005739103,0.02081979],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0012034805,0.00044522417,0.013032332,0.00083127985,0.00013241146,0.00057055603,0.00062698114,0.019057758,0.052452024,0.011852417,0.16671139,0.7330842],"study_design_scores_gemma":[0.00022602546,0.00032599884,0.014898168,0.00016454399,0.00012246182,0.0009885316,0.00020084626,0.27068895,0.060580004,0.006322142,0.6452818,0.00020051652],"about_ca_topic_score_codex":0.0022360245,"about_ca_topic_score_gemma":0.001642998,"teacher_disagreement_score":0.03800084,"about_ca_system_score_codex":0.00032482456,"about_ca_system_score_gemma":0.0006521701,"threshold_uncertainty_score":0.1271255},"labels":[],"label_agreement":null},{"id":"W970775266","doi":"","title":"The Role of Identity in Adopting Building Information Modeling: A Comparative Study","year":2015,"lang":"en","type":"article","venue":"Americas Conference on Information Systems","topic":"BIM and Construction Integration","field":"Engineering","cited_by":3,"is_retracted":false,"has_abstract":true,"route_ca_aff":true,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":false,"ca_institutions":"Université du Québec à Rimouski; Université du Québec à Montréal","funders":"","keywords":"Building information modeling; Identity (music); Resistance (ecology); Construction industry; Knowledge management; Business; Work (physics); Marketing; Computer science; Engineering; Operations management; Construction engineering; Mechanical engineering","score_opus":0.05047523650699411,"score_gpt":0.29570312668684434,"score_spread":0.24522789017985022,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W970775266","genre_codex":"empirical","genre_gemma":"empirical","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"empirical","genre_consensus":"empirical","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.9881936,0.00021130368,0.00034597647,0.00045669748,0.000008707491,0.000026261092,0.000008705814,0.0000016757491,0.010747017],"genre_scores_gemma":[0.9988821,0.00023802317,0.00018226217,0.00007403632,0.0000027130836,0.000018861183,0.000008987486,0.000003286976,0.00058969087],"study_design_codex":"qualitative","study_design_gemma":"observational","domain_scores_codex":[0.9898705,0.006730178,0.0003546199,0.0004090486,0.0013016278,0.0013339922],"domain_scores_gemma":[0.97469723,0.018291254,0.0027094511,0.0007337688,0.0021710738,0.00139721],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.01639731,0.00022834311,0.00060261023,0.003255354,0.007477604,0.006670751,0.0013960182,0.0015084076,0.0051656966],"category_scores_gemma":[0.030480996,0.00044531922,0.00041074323,0.003331765,0.006967424,0.007853087,0.006177212,0.0026211045,0.00035268228],"study_design_candidate":"observational","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0001189097,0.0006302997,0.04966957,0.00012661458,0.00001550636,0.0006334286,0.91808623,0.00004863314,0.0003689436,0.013697719,0.00026940927,0.016334858],"study_design_scores_gemma":[0.0000064183214,0.00012847212,0.029564317,0.00012918384,0.000017507624,0.00020471193,0.9637079,0.00024349331,0.000163214,0.00079367793,0.0050267843,0.000014247641],"about_ca_topic_score_codex":0.011421758,"about_ca_topic_score_gemma":0.019100714,"teacher_disagreement_score":0.01639731,"about_ca_system_score_codex":0.004952881,"about_ca_system_score_gemma":0.004105478,"threshold_uncertainty_score":0.08671832},"labels":[],"label_agreement":null},{"id":"W972340795","doi":"10.11575/prism/26853","title":"Measuring a Design Process","year":2014,"lang":"en","type":"dissertation","venue":"PRISM (University of Calgary)","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":true,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Computer science","score_opus":0.012590698413327897,"score_gpt":0.17818654935799752,"score_spread":0.1655958509446696,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W972340795","genre_codex":"methods","genre_gemma":"methods","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"methods","genre_consensus":"methods","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.039465293,0.002125171,0.805195,0.0043994104,0.00038592925,0.00073005824,0.00022966911,0.00047939701,0.14699005],"genre_scores_gemma":[0.54316974,0.0017530947,0.43955898,0.000812414,0.0001457833,0.00083078566,0.0003287496,0.00030100413,0.013099498],"study_design_codex":"theoretical_or_conceptual","study_design_gemma":"not_applicable","domain_scores_codex":[0.9600967,0.021618852,0.0018851554,0.0036826925,0.011956767,0.00075979915],"domain_scores_gemma":[0.9483259,0.028168889,0.0034433517,0.010436976,0.008613943,0.0010110411],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.025235714,0.0015435661,0.0005564022,0.0055322493,0.0025608344,0.011756035,0.0018164571,0.0023691515,0.0073542944],"category_scores_gemma":[0.057692997,0.00071655255,0.00096206355,0.0031060716,0.014912883,0.0135162575,0.0053877686,0.002634925,0.0017590082],"study_design_candidate":"not_applicable","study_design_consensus":null,"about_ca_topic_candidate":false,"about_ca_topic_consensus":false,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.000037079666,0.000120274766,0.004887624,0.00050538086,0.00006740333,0.000064404965,0.011554308,0.003584092,0.0032936044,0.8699629,0.0021049466,0.10381802],"study_design_scores_gemma":[0.000034540302,0.00042712246,0.0050126556,0.0011590729,0.000083847684,0.00029979885,0.007956085,0.006648503,0.0075570624,0.7857241,0.18499987,0.00009730806],"about_ca_topic_score_codex":0.0016174767,"about_ca_topic_score_gemma":0.0011606711,"teacher_disagreement_score":0.025235714,"about_ca_system_score_codex":0.0052841804,"about_ca_system_score_gemma":0.007004923,"threshold_uncertainty_score":0.13346082},"labels":[],"label_agreement":null},{"id":"W979672916","doi":"","title":"Annual Conference of the Canadian Society for Civil Engineering 2013 : Know-How--Savoir-Faire : Montreal, Canada 29 May-1 June 2013","year":2015,"lang":"en","type":"book","venue":"Medical Entomology and Zoology","topic":"BIM and Construction Integration","field":"Engineering","cited_by":0,"is_retracted":false,"has_abstract":false,"route_ca_aff":false,"route_ca_fund":false,"route_ca_venue":false,"route_about_ca":true,"ca_institutions":"","funders":"","keywords":"Political science; Library science; Media studies; History; Public administration; Sociology; Computer science","score_opus":0.008182048980130224,"score_gpt":0.18798787182358925,"score_spread":0.17980582284345903,"validation_status":"score_only:v0-immature-baseline","prediction":{"id":"W979672916","genre_codex":"other","genre_gemma":"other","domain_codex":null,"domain_gemma":null,"model_version":"metacan-v3-hybrid-931329e0061c","genre_candidate":"other","genre_consensus":"other","domain_candidate":null,"domain_consensus":null,"prediction_status":"machine_predicted_unvalidated","genre_scores_codex":[0.0023306469,0.035257977,0.006264452,0.03813388,0.022569094,0.00021752222,0.005098112,0.00088368036,0.8892445],"genre_scores_gemma":[0.0038780188,0.007455715,0.0013894899,0.000649532,0.00030488014,0.000026172596,0.0007978249,0.00018009027,0.9853182],"study_design_codex":"not_applicable","study_design_gemma":"not_applicable","domain_scores_codex":[0.9989617,0.000051628806,0.000019691064,0.00007855638,0.00066114246,0.00022729611],"domain_scores_gemma":[0.9985744,0.000038722264,0.000018213539,0.000030247227,0.00092811475,0.00041033045],"candidate_categories":[],"consensus_categories":[],"category_scores_codex":[0.0016721602,0.0014438569,0.00071193086,0.0017542378,0.005112109,0.0055324463,0.0012562362,0.0016371679,0.19156216],"category_scores_gemma":[0.0014098033,0.0005447577,0.00051237486,0.0024725348,0.0018371686,0.0019075859,0.0022525233,0.0021037292,0.040259346],"study_design_candidate":"not_applicable","study_design_consensus":"not_applicable","about_ca_topic_candidate":true,"about_ca_topic_consensus":true,"about_ca_system_candidate":false,"about_ca_system_consensus":false,"study_design_scores_codex":[0.0000064066758,0.000010020279,0.00016813609,0.00004230403,0.000001437431,0.000015578404,0.00013556486,0.000118372314,0.00011673835,0.0034569025,0.9521359,0.043792594],"study_design_scores_gemma":[8.2672216e-7,0.0000022684972,0.00060797826,0.00007097104,0.0000012344584,0.000011625438,0.00024438946,0.00004598002,0.000051940908,0.00043093695,0.99852604,0.0000058119285],"about_ca_topic_score_codex":0.8446542,"about_ca_topic_score_gemma":0.9695208,"teacher_disagreement_score":0.19156216,"about_ca_system_score_codex":0.024069352,"about_ca_system_score_gemma":0.07277041,"threshold_uncertainty_score":0.6408393},"labels":[],"label_agreement":null}]}